Cities Index.
Agenda packet

Redlands City Council
September 16, 2025

Document
Agenda packet
Meeting
September 16, 2025
Body
Redlands City Council
Pages
12
Original file
103.5 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

EXHIBIT A

SCOPE OF WORK

I. SCOPE OF WORK

• Contractor agrees to implement the Department of Alcoholic Beverage Control (ABC), Alcohol Policing Partnership program. This program is intended to work with law enforcement agencies to develop an effective, comprehensive and strategic approach to eliminate the crime and public nuisance problems associated with problem alcoholic beverage outlets.

• Contractor agrees to implement ABC’s Minor Decoy, Shoulder Tap Programs and conduct Informed Merchants Preventing Alcohol-Related Crime Tendencies (IMPACT) Inspections. These p rograms target both ABC licensed premises and individuals who furnish alcoholic beverages to the underage operators. The project is targeted to reduce underage drinking and the resultant DUI driving injuries and fatalities, and/or property damages, reduce youth access to alcoholic beverages through the education of licensee(s), enforcement intervention and the impressions of omnipresence of law enforcement. In addition, Contractor agrees to the following goals:

1. The operation period of the grant is July 1, 2025 through June 30, 2026.

2. Contractor agrees to raise public awareness that selling, serving and/or furnishing alcoholic beverages to individuals under twenty-one years old is a criminal violation that will be prosecuted by local city and district attorneys.

3. Minor Decoy operations are designed to educate and deter licensed locations from selling/furnishing alcohol to minors. Contractor agrees to conduct Minor Decoy Operations at both “On-Sale” and “Off-Sale” licensed establishments within the operation period of the grant.

4. Shoulder Tap operations are used to detect and deter adult furnishers outside of a licensed business. Contractor agrees to conduct Shoulder Tap Operations at “Off-Sale” licensed locations to apprehend adults that are unaffiliated with the licensed businesses and who are purchasing alcohol for minors outside of the stores within the operation period of the grant.

5. Informed Merchants Preventing Alcohol-Related Crime Tendencies (IMPACT) primary goal is to educate licensee’s on alcohol related laws to help reduce alcohol -related crime in and around licensed premises. Contractor agrees to conduct visits and inspections of licensed premises identifying areas of non-compliance at “On-Sale” and “Off-Sale” licensed locations within the operation period of the grant.

II. GOALS AND OBJECTIVES

1. Conduct at least four (4) Minor Decoy operations.

2. Conduct at least four (4) Shoulder tap operations, including the Statewide Shoulder tap operation.

3. Conduct at least four (4) IMPACT operations.

Agreement Number: 25-APP36
City of Redlands through the Redlands Police Department

Page 2 of 2 ends

4. Conduct at least two (2) Trap Door operations.

5. Conduct at least three (3) Plain clothes or Uniformed Special Event operations.

6. Conduct at least three (3) Roll Call trainings.

7. Conduct at least one (1) Alcohol education/awareness presentation at each high school using a School Resource officer.

8. Produce at least two (2) educational videos to be released on Redlands PD social media accounts.

9. Advertise at least one (1) LEAD training.

10. Provide press/social media releases on grant enforcement activities.

A. To announce the start of the program;
B. At the conclusion of each Minor Decoy Operation has been held (to announce the number of licensed premises who sold to the minor decoy) C. At the conclusion of each Shoulder Tap Operation has been held (to announce the number of adults arrested for purchasing alcoholic beverages for the decoy).

11. Contractor will fax (916) 419-2599 or email each press release to the Department’s Public Information Officer ([email protected]) as soon as it is released.

12. Contractor agrees in all press releases, in addition to any credits the agency wishes to give, will include the following statement: “This project is part of the Department of Alcoholic Beverage Control’s Alcohol Policing Partnership.”

Contractor agrees to complete and submit monthly reports, on a format designed and provided by the Department of Alcoholic Beverage Control due no later than 15th of the following month.

III. PROJECT REPRESENTATIVES

The project representatives during the term of this agreement will be:

Redlands Police Department
Richard McLaughlin, Officer
30 Cajon Street
Redlands, CA 92373
(909) 798-7681
[email protected]
Department of Alcoholic Beverage Control
Aaron Perry, Supervising Agent in Charge
3927 Lennane Drive, Suite 100
Sacramento, CA 95834
(916) 419-5169
[email protected]

Direct all fiscal inquiries to:

Redlands Police Department
Jimmy Nguyen, Management Analyst
30 Cajon Street
Redlands, CA 92373
(909) 335-4751
[email protected]
Department of Alcoholic Beverage Control
Kristine Okino, Grant Coordinator
3927 Lennane Drive, Suite 100
Sacramento, CA 95834
[email protected]

Agreement Number: 25-APP36
City of Redlands through the Redlands Police Department

Page 1 of 3 ends

EXHIBIT B

BUDGET DETAIL AND PAYMENT PROVISIONS

I. INVOICING AND PAYMENT

• For services satisfactorily rendered and upon receipt and approval of the invoice, the Department of Alcoholic Beverage Control agrees to pay a monthly payment of approved reimbursable costs per the Budget Detail of personnel overtime and benefits (actual cost) and/or allowable costs.

• Invoices shall clearly reference this contract number (25-APP36) and must not exceed the contract total authorized amount of $42,648.00. Invoices are to be submitted by the 15th of every month, on the prescribed form designed by the Department of Alcoholic Beverage Control .

Submit to: Department of Alcoholic Beverage Control
Attn: Kristine Okino, Grant Coordinator
3927 Lennane Drive
Sacramento, California 95834

• Payment shall be made in arrears within 30 days from the receipt of an undisputed invoice. Nothing contained herein shall prohibit advance payments as authorized by Item 2100- 101-3036, Budget Act, Statues of 2025.

• Contractor understands in order to be eligible for reimbursement; cost must be incurred on or after the effective date of the project, July 1, 2025 and on or before the project termination date , June 30, 2026.

• Revisions to the “Scope of Work” and the “Budget Detail” may be requested by a change request letter submitted by the Contractor. If approved, the revised Grant Scope of Work and/or Budget Detail supersedes and replaces the previous grant and will initiate an amendment. No revisions can exceed allotted amount as shown on the Budget Detail. The total amount of the grant must remain unchanged.

• Contractor agrees to refund to the State any amounts claimed for reimbursement and paid to Contractor which are later disallowed by the State after audit or inspection of records maintained by the Contractor.

• Only the costs displayed in the Budget Detail are authorized for reimbursement by the State to Contractor under this agreement. Any other costs incurred by Contractor in the performance of this agreement are the sole responsibility of Contractor.

• Title shall be reserved to the State for any State- furnished or State-financed property authorized by the State which is not fully consumed in the performance of this agreement. Contractor is responsible for the care, maintenance, repair, and protection of any such property. Inventory records shall be maintained by Contractor and submitted to the State upon request. All such property shall be returned to the State upon the expiration of this grant unless the State otherwise directs.

• Prior approval by the State in writing is required for the location, costs, dates, agenda, instructors, instructional materials, and attendees at any reimbursable training seminar, workshop or conference, and over any reimbursable publicity or educational materials to be made available for distribution.

Contractor is required to acknowledge the support of the State whenever publicizing the work under this grant in any media.

Agreement Number: 25-APP36
City of Redlands through the Redlands Police Department

Page 2 of 3 ends

II. BUDGET DETAIL

COST CATEGORY TOTAL COST
A. Personnel Services
Overtime
Officer ($96.00/hourly) $17,280.00
Sergeant ($129.00/hourly) $11,610.00
Corporal ($108.00/hourly) $9,720.00
Benefits – 1.4% $558.00
TOTAL Personnel $39,168.00
B. Operating Expenses (receipts required)
Buy money $480.00
TOTAL Operating $480.00
C. Equipment (receipts required, must be purchased by 12/31) n/a $0.00
TOTAL Equipment $0.00
D. Travel Costs
Registration, lodging, per diem $3,000.00
TOTAL Travel $3,000.00
GRANT TOTAL $42,648.00

Agreement Number: 25-APP36
City of Redlands through the Redlands Police Department

Page 3 of 3 ends

III. BUDGET CONTINGENCY CLAUSE

• It is mutually agreed that if the Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall be of no further force and effect. In this event, the State shall have no liability to pay any funds whatsoever to Contractor or to furnish any other considerations under this Agreement and Contractor shall not be obligated to perform any provisions of this Agreement.

• If funding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the option to either cancel this Agreement with no liability occurring to the State, or offer an agreement amendment to Contractor to reflect the reduced amount.

IV. PROMPT PAYMENT CLAUSE

• Payment will be made in accordance with, and within the time specified in, Government Code Chapter

4.5, commencing with Section 927.

General Terms and Conditions (GTC 02/2025)

EXHIBIT C

1. APPROVAL: This Agreement is of no force or effect until signed by both parties and approved by the Department of General Services, if required. Contractor may not commence performance until such approval has been obtained.

2. AMENDMENT: No amendment or variation of the terms of this Agreement shall be valid unless made in writing, signed by the parties and approved as required. No oral understanding or Agreement not incorporated in the Agreement is binding on any of the parties.

3. ASSIGNMENT: This Agreement is not assignable by the Contractor, either in whole or in part, without the consent of the State in the form of a formal written amendment.

4. AUDIT: Contractor agrees that the awarding department, the Department of General Services, the Bureau of State Audits, or their designated representative shall have the right to review and to copy any records and supporting documentation pertaining to the performance of this Agreement. Contractor agrees to maintain such records for possible audit for a minimum of three (3) years after final payment, unless a longer period of records retention is stipulated. Contractor agrees to allow the auditor(s) access to such records during normal business hours and to allow interviews of any employees who might reasonably have information related to such records. Further, Contractor agrees to include a similar right of the State to audit records and interview staff in any subcontract related to performance of this Agreement. (Gov. Code §8546.7, Pub. Contract Code §10115 et seq., CCR Title 2, Section 1896).

5. INDEMNIFICATION: Contractor agrees to indemnify, defend and save harmless the State, its officers, agents and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, suppliers, laborers, and any other person, firm or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be injured or damaged by Contractor in the performance of this Agreement.

6. DISPUTES: Contractor shall continue with the responsibilities under this Agreement during any dispute.

7. TERMINATION FOR CAUSE: The State may terminate this Agreement and be relieved of any payments should the Contractor fail to perform the requirements of this Agreement at the time and in the manner herein provided. In the event of such termination the State may proceed with the work in any manner deemed proper by the State. All costs to the State shall be deducted from any sum due the Contractor under this Agreement and the balance, if any, shall be paid to the Contractor upon demand.

8. INDEPENDENT CONTRACTOR: Contractor, and the agents and employees of Contractor, in the performance of this Agreement, shall act in an independent capacity and not as officers or employees or agents of the State.

9. RECYCLING CERTIFICATION: The Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post-consumer material as defined in the Public Contract Code Section 12200, in products, materials, goods, or supplies offered or sold to the State regardless of whether the product meets the requirements of Public Contract Code Section 12209. With respect to printer or duplication cartridges that comply with the requirements of Section 12156(e), the certification required by this subdivision shall specify that the cartridges so comply (Pub. Contract Code §12205).

10. NON-DISCRIMINATION CLAUSE: During the performance of this Agreement, Contractor and its subcontractors shall not deny the contract’s benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination. Contractor and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code §12900 et seq.), the regulations promulgated thereunder (Cal. Code Regs., tit. 2, §11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Gov. Code §§11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article. Contractor shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours’ notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause.

Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement. (See Cal. Code Regs., tit. 2, §11105.) Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Agreement.

11. CERTIFICATION CLAUSES: The CONTRACTOR CERTIFICATION CLAUSES contained in the document CCC 04/2017 are hereby incorporated by reference and made a part of this Agreement by this reference as if attached hereto.

12. TIMELINESS: Time is of the essence in this Agreement.

13. COMPENSATION: The consideration to be paid Contractor, as provided herein, shall be in compensation for all of Contractor's expenses incurred in the performance hereof, including travel, per diem, and taxes, unless otherwise expressly so provided.

14. GOVERNING LAW: This contract is governed by and shall be interpreted in accordance with the laws of the State of California.

15. ANTITRUST CLAIMS: The Contractor by signing this agreement hereby certifies that if these services or goods are obtained by means of a competitive bid, the Contractor shall comply with the requirements of the Government Codes Sections set out below.
a. The Government Code Chapter on Antitrust claims contains the following definitions:
1) "Public purchase" means a purchase by means of competitive bids of goods, services, or materials by the State or any of its political subdivisions or public agencies on whose behalf the Attorney General may bring an action pursuant to subdivision (c) of Section 16750 of the Business and Professions Code.
2) "Public purchasing body" means the State or the subdivision or agency making a public purchase. Government Code Section 4550. b. In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder.

Government Code Section 4552.
c. If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid by the assignor but were not paid by the public body as part of the bid price, less the expenses incurred in obtaining that portion of the recovery. Government Code Section 4553.
d. Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action. See Government Code Section 4554.

16. CHILD SUPPORT COMPLIANCE ACT: For any Agreement in excess of $100,000, the contractor acknowledges in accordance with Public Contract Code 7110, that:
a. The contractor recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter 8 (commencing with section 5200) of Part 5 of Division 9 of the Family Code; and
b. The contractor, to the best of its knowledge is fully complying with the earnings assignment orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department.

17. UNENFORCEABLE PROVISION: In the event that any provision of this Agreement is unenforceable or held to be unenforceable, then the parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby.

18. PRIORITY HIRING CONSIDERATIONS: If this Contract includes services in excess of $200,000, the Contractor shall give priority consideration in filling vacancies in positions funded by the Contract to qualified recipients of aid under Welfare and Institutions Code Section 11200 in accordance with Pub. Contract Code §10353.

19. SMALL BUSINESS PARTICIPATION AND DVBE PARTICIPATION REPORTING REQUIREMENTS:
a. If for this Contract Contractor made a commitment to achieve small business participation, then Contractor must within 60 days of receiving final payment under this Contract (or within such other time period as may be specified elsewhere in this Contract) report to the awarding department the actual percentage of small business participation that was achieved. (Govt. Code § 14841.)
b. If for this Contract Contractor made a commitment to achieve disabled veteran business enterprise (DVBE) participation, then Contractor must within 60 days of receiving final payment under this Contract (or within such other time period as may be specified elsewhere in this Contract) certify in a report to the awarding department: (1) the total amount the prime Contractor received under the Contract; (2) the name and address of the DVBE(s) that participated in the performance of the Contract; (3) the amount each DVBE received from the prime Contractor; (4) that all payments under the Contract have been made to the DVBE; and (5) the actual percentage of DVBE participation that was achieved. A person or entity that knowingly provides false information shall be subject to a civil penalty for each violation. (Mil. & Vets. Code § 999.5(d); Govt. Code § 14841.)

20. LOSS LEADER: If this contract involves the furnishing of equipment, materials, or supplies then the following statement is incorporated: It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in Section 17030 of the Business and Professions Code. (PCC 10344(e).)

21. GENERATIVE AI DISCLOSURE OBLIGATIONS:
a. The following terms are in addition to the defined terms and shall apply to the Contract:

1) “Generative AI (GenAI)” means an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system's training data. (Gov. Code § 11549.64.)

b. Contractor shall immediately notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

c. Notification shall be provided to the State designee identified in this Contract.

d. At the direction of the State, Contractor shall discontinue the provision to the State of any previously unreported GenAI that results in a material impact to the functionality of the System, risk to the State, or Contract performance, as determined by the State.

e. If the use of previously undisclosed GenAI is approved by the State, then Contractor will update the Deliverable description, and the Parties will amend the Contract accordingly, which may include incorporating the GenAI Special Provisions into the Contract, at no additional cost to the State.

f. The State, at its sole discretion, may consider Contractor’s failure to disclose or discontinue the provision or use of GenAI as described above, to constitute a material breach of Contract when such failure results in a material impact to the functionality of the System, risk to the State, or Contract performance. The State is entitled to seek any and all remedies available to it under law as a result of such breach, including but not limited to termination of the contract.

Agreement Number: 25-APP36
City of Redlands through the Redlands Police Department

Page 1 of 1 ends

EXHIBIT D

SPECIAL TERMS AND CONDITIONS

1. Disputes: Any disputes concerning a question of fact arising under this contract which is not disposed of by agreement shall be decided by the Director, Department of Alcoholic Beverage Control, or designee, who shall reduce his decision in writing and mail or otherwise furnish a copy thereof to the Contractor. The decision of the Department shall be final and conclusive unless, within 30 days from the date of receipt of such copy, the Contractor mails or otherwise furnishes to the State a written appeal addressed to the Director of the Department of Alcoholic Beverage Control. The decision of the Director of Alcoholic Beverage Control or his duly authorized representative for the determination of such appeals shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, capricious, arbitrary, or so grossly erroneous as necessarily to imply bad faith, or not supported by substantial evidence. In connection with any appeal proceeding under this clause, the contractor shall be afforded an opportunity to be heard and to offer evidence in support of its appeal. Pending final decision of a dispute hereunder, Contractor shall proceed diligently with the performance of the contract and in accordance with the decision of the State.

2. Cancellation/Termination: This agreement may be cancelled or terminated without cause by either party by giving thirty (30) calendar days advance written notice to the other party. Such notification shall state the effective date of termination or cancellation and include any final performance and/or payment/invoicing instructions/requirements. No penalty shall accrue to either party because of contract termination.

3. Contract Validity: This contract is valid and enforceable only if adequate funds are appropriated in Item 2100-101-3036, Budget Act of 2025, for the purposes of this program.

4. Contractor Certifications: By signing this agreement, Contractor certifies compliance with the provisions of CCC 04/2017, Standard Contractor Certification Clauses. This document may be viewed at: https://www.dgs.ca.gov/OLS/Resources/Page- Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language

5. If the State determines that the grant project is not achieving its goals and objectives on schedule, funding may be reduced by the State to reflect this lower level of project activity and/or cancel the agreement.

DATE OF REQUEST:

An additional appropriation is hereby requested as follows:

Department:

JUSTIFICATION:

Requested By:

Recommended By Finance Director:

Recommended:

Yes
No
Signed
Comments:

Approved by City Council:

Date:

Signed:

City Clerk
REVENUE APPROPRIATION INCREASE (if applicable)
EXPENDITURE APPROPRIATION INCREASE (if applicable)
$ -
$ -
TRANSACTION NO:

ACCOUNTING PERIOD:

Account Description
Orgkey
Object Code
Job Ledger (If
applicable)
Amount
Job Ledger (If
applicable)
Amount
Account Description
Orgkey
Object Code
Department Head
City Manager

CITY OF REDLANDS

REQUEST FOR ADDITIONAL APPROPRIATION

FINANCE USE ONLY

Page 1 of 1 ends

City Council/Financing Authority Meeting I. 16.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Accept the grant award from the Juvenile Justice Crime Prevention Act Program, and authorize an additional appropriation of $40,000 to the Police Department (Police Chief Tolber)
MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:

I move to accept the grant award from the Juvenile Justice Crime Prevention Act Program, and authorize an additional appropriation of $40,000 to the Police Department.

RECOMMENDATION:

Staff recommends that the Council accept the grant award from the Juvenile Justice Crime Prevention Act Program, and authorize an additional appropriation of $40,000 to the Police Department.

DISCUSSION:

In November 2024, the Redlands Police Department applied for $40,000 in Juvenile Justice Crime Prevention Act (JJCPA) grant funds through the San Bernardino County Probation Department. These funds will support an after-school program for local at-risk youth and youthful offenders.

The program is designed to promote physical fitness, social development, and mental well-being. Activities will include Go Ruck Tribe ‘N Training, Jiu Jitsu instruction, and leadership development exercises. The goal is to engage participants in positive experiences that reduce the risk of justice system involvement. Program objectives include reducing bullying, building confidence, and fostering a more positive outlook for justice-involved youth, at-risk youth, and their families.
and their families.

All eligible program-related expenses will be reimbursed through the grant funds allocated by the San Bernardino County Probation Department.

ALTERNATIVES:

Do not accept the grant award, or approve additional appropriation in the amount of $40,000.

STRATEGIC PLAN:

Not applicable.

SUBMITTED BY:

Rachel Tolber, Chief of Police
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Jimmy Nguyen, Management Analyst
Fiscal Impact
Fiscal Year: 2025-26
Revenue Generating: N
Appropriation Required Y/N: Y
Amount: $40,000
Budgeted Y/N: N
Account No.: 200202
Discussion:

There will be no fiscal impact to the General Fund.

Attachments
Purchasing Contract
Approved MOU
Addt'l Appropriation

Supplier
Number: 50000195
Name: CITY OF REDLANDS
Address: PO Box 3005
REDLANDS, CA 92373
USA
Phone: 909-798-7544
Email: [email protected]
ContractContract Number: 4400028821
Smart Number: 481-26-CON
Contract Type: Purchasing Contract
Status: Released
Contact Person: Iveth Herrera Zavala
Phone:

Email: [email protected]
NTY.GOV
Date: 07/09/2025
Timeframe: 07/09/2025 to 01/14/2030
Payment Terms: Payable upon receipt without deductions
Retention: 0.00
Incoterms: Free On Board - DESTINATION
Item Prod/Cat Description Qty Unit Price Discount Tax Ret. Total 1 46180000 Program Supplies 0 EA 0.00 0.00 0.00 0.00 0.00 USD 2 86000000 30 Go Ruck Memberships for the year 0 0.00 0.00 0.00 0.00 0.00 USD 3 80000000 Motivational speakers throuout the
year
0 0.00 0.00 0.00 0.00 0.00 USD Total Contract Value: 40,000.00 USD
APPROVED:

BY: Pete Mendoza, Director of Purchasing

Page 1 ends

DATE OF REQUEST:

An additional appropriation is hereby requested as follows:

Department:

JUSTIFICATION:

Requested By:

Recommended By Finance Director:

Recommended:

Yes
No
Signed
Comments:

Approved by City Council:

Date:

Signed:

City Clerk
REVENUE APPROPRIATION INCREASE (if applicable)
EXPENDITURE APPROPRIATION INCREASE (if applicable)
$ -
$ -
TRANSACTION NO:

ACCOUNTING PERIOD:

Account Description
Orgkey
Object Code
Job Ledger (If
applicable)
Amount
Job Ledger (If
applicable)
Amount
Account Description
Orgkey
Object Code
Department Head
City Manager

CITY OF REDLANDS

REQUEST FOR ADDITIONAL APPROPRIATION

FINANCE USE ONLY

Page 1 of 1 ends

City Council/Financing Authority Meeting I. 17.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Approve the use of city resources and the request for in-kind support in the amount of $16,397.00 related to the Redlands Turkey Trot event hosted by Phoenix Hope International on November 27, 2025; approve temporary street closures related to the event; and determine that the event is categorically exempt from environmental review pursuant to Section 15311(c) of the State's guidelines implementing the California Environmental Quality Act (Facilities and Community Services Department Director Crocker)
MOTION(S):

If the City Council determines that staff’s recommendations are appropriate, the following motions are provided:

I move that the City Council determine that the approval of the event is exempt from environmental review pursuant to Section 15311(c) of the State's guidelines implementing the California Environmental Quality Act;

1. I move to authorize the expenditure of city resources and in-kind support in the amount of $16,397.00 related to the Redlands Turkey Trot event hosted by Phoenix Hope International; and

2. I move to authorize the temporary street closures related to the event.3.

RECOMMENDATION:

Staff recommends that the City Council determine that authorization for the items associated with the Redlands Turkey Trot, scheduled on November 27, 2025, is exempt from environmental review pursuant to Section 15311(c) of the State's guidelines implementing the California Environmental Quality Act (CEQA). Staff further recommends that the City Council direct staff accordingly regarding the temporary street closures outlined in the staff report, and the expenditure of city resources and in-kind support in the amount of $16,397.00, including costs for personnel, equipment, and related services.

DISCUSSION:

The Facilities and Community Services Department manages the administration and issuance of permits for special events held in public areas of the City. Upon the issuance of a special event permit, the event may take place contingent on the event organizer paying the required fees. The City recognizes the value of partnering with non-profit agencies and organizations to provide services beneficial to the community. In an effort to support programs that provide a community benefit, the City Council will, from time to time, consider the authorization of in-kind support including the use of city equipment, staff, and facilities for special events.

Phoenix Hope International is requesting in-kind support in the amount of $16,397.00 and temporary closure of Colton Ave between Division Street and Grove St, Division St. between E Colton St. and Park Ave, E Park Ave. between Division Street and University Street, N University Street between E Park Ave and Cornell Ave, Sylvan Blvd between N University St and N Grove St, N Grove St between Sylvan Blvd and E Brockton Ave, E Brockton Ave, between N Grove St, and N University St, from the hours of 5:00 a.m. to 11:00 a.m. as well as the reservation of Sylvan Park for the duration of the event.

Phoenix Hope International is a non-profit organization operating out of the City of Mesa, Arizona. According to the submitted application, this will be the 11th year Phoenix Hope International has partnered with the City of Redlands for this event. In celebration of the 11th Annual Redlands Turkey Trot, Phoenix Hope International is partnering with Inland Harvest in hopes of collecting 10,000 lbs of food. All canned goods donated will go to local non-profit agencies that provide food for needy populations and all proceeds from this year's event will benefit Redlands Schools and local charities. The City previously approved in-kind support, in 2024, in the amount of $14,536.00 for the annual Redlands Turkey Trot hosted by Phoenix Hope International.

The event is exempt from the requirements of the California Environmental Quality Act’s guidelines pursuant to Section 15311(c). Section 15311(c), accessory structures Class 11 facilities, consists of construction, or replacement of minor structure accessory to existing commercial, industrial, or institutional facilities, including placement of seasonal or temporary use items such as mobile food units, portable restrooms or similar items in generally the same locations from time to time in publicly owned parks or other facilities designed for public use.

ALTERNATIVES:

The City Council may elect to deny the request for in-kind support, deny the request for temporary street closure and direct staff accordingly.

STRATEGIC PLAN:

Priority A - Quality of Life, Beautification, Arts and Culture.

SUBMITTED BY:

Tabitha Crocker, Facilities and Community Services Department Director REVIEWED BY:

Charles M. Duggan Jr., City Manager
Janice McConnell, Assistant City Manager
Christopher Boatman, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Jaclyn Ramirez, Administrative Assistant II
Fiscal Impact
Fiscal Year: 2025/26
Revenue Generating: N
Appropriation Required Y/N: N
Amount: $16,397.00
Budgeted Y/N: N
Discussion:

Please see the "Fiscal Impact" attachment for reference.

Attachments
Special Event Packet
In-Kind Request
Event Maps (Traffic Plans)
Verification of Non-Profit
Street Closure Permit
Fiscal Impact

Traffic Plan
Thursday, November 27, 2025
8 a.m.

Phoenix Hope International

Event Information
Event Organizer: Phoenix Hope International
Race Contact: Kent Sommer
(714) 614-7321
[email protected]

Race proceeds benefitting the following organizations:

Phoenix Hope
International
Redlands
Educational
Partnership
Inland Harvest
Food Bank

Race Day Schedule
Morning Check-In: 7 a.m.

Kids 1K Start: 7:45 a.m.
5K Race Start: 8 a.m.

Last Finisher: 9:30 a.m.

Awards: 9:30 a.m.

Clean-up: 10-11 a.m.
5K Course
Start/Finish
The 5k and 1k course is different than prior
years:

1. Start at corner of University St and
Brockton Ave

2. Participants will run south on
University St.

3. West on Colton Ave.

4. South on Division St.

5. East on Park Ave

6. North on University St.

7. East on Sylvan Blvd

8. North on Grove St.

9. East on Colton Ave

10. North on West Drive

11. East on Chapel Dr.

12. South on East Drive

13. East on Colton Ave

14. North on Grove St

15. West on Brockton Ave. to the Finish

Kids’ 1K Course
Start/Finish
The kids (12 and under) 1K
fun run course will be as
follows:

1. Start the corner of
University St and E
Brockton Ave

2. Participants will run
south on University St.

3. East on Chapel Drive

4. Continue east on East Dr.

5. Through the parking lot
to E Brockton Ave.

6. West on Brockton Ave to
the Finish

Street Closures
The following street closures are proposed for the
event.

1. Colton Ave between Division Street and Grove
St.

2. Division St. between E Colton St. and Park Ave.

3. E Park Ave. between Division Street and
University Street.

4. N University Street between E Park Ave and
Cornell Ave.

5. Sylvan Blvd between N University St and N
Grove St.

6. N Grove St between Sylvan Blvd and E Brockton
Ave

7. E Brockton Ave between N Grove St and N
University St.

Street closures will likely last two hours from 7:30
(15 minutes before the 1K race begins) to 9:30 a.m.
(estimated time when last runner will finish the
5K).

Roads will remain open and accessible to
emergency vehicles as well as any residents that
live on a street that is closed.
3 2
4 5
61 7
Traffic Monitor Locations
Traffic Monitor Intersections:

1. Cornell Ave and University St

2. University St and Brockton Ave

3. University St and Campus Ave

4. University St. and College Ave

5. Colton Ave and Occidental Dr

6. Colton Ave and Division St

7. Division St and Park Ave

8. University St and Park Ave

9. Sylvan Ave Blvd and Cook St

10. Grove St. and E. Sylvan Blvd

11. Grove St and Colton Ave

12. Grove St and College Ave

13. Grove St and Clock St

14. Grove St and Campus Ave

15. Grove St and Brockton Ave
1 2
4 5
6 7 8
9 10
11 12
13 14
3 Start/Finish
Finish
15 Traffic Monitors Continued
All monitors will be provided by Phoenix Hope International/Race Organizer.

All monitors will be over 18 years old, will wear safety reflector vests, and will all be trained in traffic safety for the event.

Monitors will have radios and direct communication with the race info/headquarters located in Sylvan park. Any incidents will be immediately reported to race info so that appropriate personnel are notified and can be dispatched to area if needed.

Monitors will be familiar with the course as well as surrounding area in order to instruct motorists of available detours around the event.

Start/Finish Line
The race start is on University St. near the Brockton Ave.

The finish line will be on Brockton Ave near University St.

An inflatable arch is placed at the start and finish line There are various 10x10 canopies (“EZ Ups”) placed in the near the start/finish line area. One EZ up is near the finish line and used by the timing company. Other EZ ups to be placed in TRS parking lot or Serrano Lawn for race day check-in, t-shirt distribution and volunteer check in. Small staging area also set up for handing out post-race awards.

Port-a-potties are purchased for the event and are placed near the start/finish area in TRS parking lot.

First Aid
• One EMT located at start/finish line.
• Nurse or other medical personnel on-site at first aid booth to treat light injuries (muscle, strains, sprains, cramps, etc.) • Area Urgent Care / ER notified of event
• Any other provisions/recommendations from the City
Safety
Post race Overview
• Potential post race expo involving local vendors/sponsors • Hand out participant t-shirts
• Awards (Thanksgiving pies) to all male/female overall winners and age group winners
• Appropriate health permits (as needed) for post-race food (bananas and orange slices)
• Port-a-potties + hand wash stations at start/finish line • Clean-up area and dispose of trash
• Return all barricades to City Yard
• Last three years all roads were reopened by 9:15 a.m. and entire event was cleaned up and all participants and race organizers were gone by 11 a.m.

In anticipation of the City Council's consideration of this request, staff has compiled the following table outlining costs related to fees established by Resolution of the City Council and departmental charges pertaining to personnel and equipment resources necessary for the support of the event. The departmental charges are costs outside of normal City operations that would not be incurred by the City if the special event was not taking place.

Departmental Charges
(Personnel & Equipment)
2025-2026
Amount Type 2024-2025
Amount
Police Personnel1 $13,551.00 Hard Cost $12,300.00
Fire Personnel1 $0.00 Hard Cost $0.00
Facilities & Community Services Personnel1 $2,700.00 Hard Cost $2,025.00 Personnel & Equipment Subtotal $16,251.00 $14,325.00
Fees Established by City Council
Resolution

Park Reservation $146.00 Soft Cost $211.00
FCS Equipment $0.00 Soft Cost $0.00
Fire Equipment $0.00 Soft Cost $0.00
Fees Subtotal $146.00 $211.00
Total Departmental Charges and Fees $16,397.00 $14,536.00

$16,251.00
$146.00
$16,397.00
Hard Cost
Soft Cost
Total
$14,325.00
$211.00
$14,536.00
1Personnel costs are calculated conservatively assuming the highest staff cost scenario. Actual costs may vary on the day of the event based on the actual staff present. Actual costs will be confirmed following the event and will be included in a reconciliation report presented to the City Council.

The following table summarizes the total estimated costs associated with the use of City resources and waiver of fees approved for events scheduled during Fiscal Year 2025-26 to date:

TABLE 2: FY 2025-26 Fee Waivers to date
Hard Costs Soft Costs Deposits
Refunded
Waiver
Amount
Net
Amount
$129,438.12 $9,928.63 $0.00 $139,366.75 $139,366.75

City Council/Financing Authority Meeting J. 1.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Report and recommendation by the Ad Hoc Committee of the City Council regarding the selection of a Lead Labor Negotiator to represent the City during the upcoming contract negotiations with the City's bargaining units and possible direction to staff (Mayor Pro Tem Shaw and Council Member Davis)
MOTION:

If the City Council concurs with the Ad Hoc Committee's recommendation, the following motion is provided.

I move to direct staff to retain John Bakhit of Atkinson, Andelson, Loya, Ruud & Romo to serve as the City's lead labor negotiator for the City's upcoming contract negotiations with its bargaining units.

RECOMMENDATION:

It is recommended by the City Council Ad Hoc Committee to retain John Bakhit of Atkinson, Andelson, Loya, Ruud & Romo to serve as the City's lead labor negotiator for the City's upcoming contract negotiations with its bargaining units.

DISCUSSION:

The current Memoranda of Understanding between the City and its nine bargaining units will expire on June 30, 2026. As the City prepares for the upcoming negotiations, an important step in the process is to select a lead labor negotiator to represent the City during the collective bargaining process with the various units.

At the regular meeting of July 15, 2025, the City Council authorized the formation of an Ad Hoc Committee of the City Council and appointed Mayor Pro Tem Shaw and Council Member Davis to the committee. The purpose of the committee was to interview experienced labor negotiators and make a recommendation for a lead labor negotiator to the full Council at a regular recommendation for a lead labor negotiator to the full Council at a regular meeting in September. The committee has conducted its interviews and has made its selection to recommend John Bakhit of Atkinson, Andelson, Loya, Ruud & Romo to the full Council. A copy of Mr. Bakhit's bio is attached for the Council's reference.

SUBMITTED BY:

Marc Shaw, Mayor Pro Tempore
Denise Davis, Council Member
Attachments
John Bakhit Bio
www.aalrr.com
John H. Bakhit
Partner
951-990-2877
[email protected]

OFFICES
12800 Center Court Drive
Suite 300
Cerritos, CA 90703

3880 Lemon Street
Suite 350
Riverside, CA 92501

INDUSTRIES
Public Educational Agencies &
Institutions
Public Entities

EDUCATION
J.D., Santa Clara University School
of Law
B.A., Columbia College, magna
cum laude

ADMISSIONS
2006, California

PRACTICE AREAS
Advice & Counsel
Collective Bargaining
COVID-19
Disciplinary Matters
Labor & Employment Law
Public Safety
John H. Bakhit is a Partner in our Riverside and Cerritos offices where he provides advice and counsel to public entities and represents them in collective bargaining, disciplinary matters, auditing/updating policies and procedures, conducting internal investigations, training, and other labor and employment matters.

Prior to entering law school, Mr. Bakhit served as an Oakland Police Officer working in Patrol and the Crime Prevention Unit where he investigated crimes and regularly wrote and served search warrants, worked undercover, and testified as an expert witness in court.

Mr. Bakhit has devoted his legal career to labor and employment law where he has represented public sector bargaining units and their members in matters arising out of the Public Safety Officers Procedural Bill of Rights (POBR), the Firefighters Procedural Bill of Rights (FBOR), the California Labor Code, the Meyers-Milias-Brown Act (MMBA), and the Higher Education Employer/Employee Relations Act (HEERA). Prior to representing public entities, Mr. Bakhit represented hundreds of individual peace officers, firefighters, and attorneys in administrative cases, critical incidents, and criminal cases. Mr. Bakhit also served as general counsel and chief negotiator for public sector bargaining units, where he regularly represented clients in contract negotiations with city, county, and state entities, meet & confers, and unfair labor practice charges in front of the Public Employment Relations Board (PERB).

Mr. Bakhit’s more than 15 years of experience from the labor side is a unique asset that allows him to effectively and efficiently deal with issues at the earliest stages, as he is able to anticipate and address the various concerns and angles that will likely be brought up by employee p2
www.aalrr.com
Public Safety Officers Procedural
Bill of Rights Act
Workplace Training

LANGUAGES
Arabic, Spanish
organizations.

Mr. Bakhit is also a POST-Certified instructor who is often called upon by organizations to give lectures and provide training on POBR, FBOR, disciplinary investigations, critical incident investigations, labor relations, unfair labor practices, and other labor and employment related matters.

During law school, Mr. Bakhit was awarded the Law Faculty Scholarship and the Certificate for Excellence in Oral Advocacy. He also completed an internship with the Santa Clara County District Attorney’s Office where he was assigned to the Gang Unit.

Honors & Recognitions
Mr. Bakhit was recognized by Martindale Hubbell® with the highest Peer Review Rating of “AV Preeminent.”
Mr. Bakhit was also recognized by Martindale Hubbell® with the highest client review rating of “Platinum Client Champion.”
Firm News
AALRR Announces 2024 Equity and Non-Equity Partners

01.23.2024

Atkinson, Andelson, Loya, Ruud & Romo Welcomes John Bakhit as Of Counsel

02.24.2022

Events & Speaking Engagements
Introduction to Public Safety Officers Procedural Bill of Rights Act Monterey, California, 11.19.2025

Alerts & Articles
Ramp Up of Employers-Focused Immigration Crackdowns Underway— What Employers Can Do to Prepare

06.20.2025

John H. Bakhit
p3
www.aalrr.com
BWC Footage and CPRA Update (Third Circuit Court of Appeal Decision)

06.12.2025

Schneider Case Regarding Brady Requirements vs. Pitchess

06.12.2025

Ninth Circuit Upholds Jury Verdict Regarding Negligence in Police Restraint Death Case Even When No Excessive Force Was Used

05.02.2025

California Appellate Court Rules that County was Required to Meet and Confer with Recognized Bargaining Unit Over the Implementation of New Legislative Changes Under Limited Circumstances

11.27.2024

PERB Provides Clarity on Risk for Repeated Labor Violations in Context of Interest Arbitration Bargaining Dispute

05.05.2023

Title 5 Amendments for Campus Climate and Public Safety Requirements – Is Your Campus Ready?

10.12.2022

PERB Reinforces Deferral to Arbitration Doctrine in Context of Retaliation Unfair Practice Claims Brought Under MMBA

10.10.2022

California Appellate Court Rules That School District Entitled to Retain Unused Hardship Funding Provided by the State of California

05.27.2022

California Appellate Court Rules that State Labor Law Preempts a Voter-Approved Measure Setting City Firefighter Salaries

03.30.2022

A California Appellate Court Rules that Digital In-Car Video System Recording Was Properly Allowed as Evidence at Police Officers’ Termination Hearings

01.12.2022

Blog Posts
California Court of Appeal Clarifies Law Enforcement Agency Liability for Safeguarding Peace Officer Personnel Information (AKA “Pitchess”) and Duties to Investigate Citizen Complaints Public Safety Law Blog, 05.02.2025

John H. Bakhit
p4
www.aalrr.com
Public Employment Relations Board Finds Pitchess Process Applies to Information Request for Peace Officer Personnel Records Arising Outside Labor or Arbitration Dispute Public Safety Law Blog, 02.05.2025

AALRR Attorney Presenting 2-day POST-Certified OIS Investigations Course at La Mesa PD Public Safety Law Blog, 10.10.2024

AALRR Attorney Presenting 2-day POST-Certified OIS Investigations Course at Long Beach PD Public Safety Law Blog, 06.05.2024

AALRR Attorney Presenting 2-day POST-Certified OIS Investigations Course at Davis PD Public Safety Law Blog, 03.15.2024

Legal Update Impacting Confidentiality of Peace Officers’ Personnel Files – Senate Bill 400 Public Safety Law Blog, 03.15.2024

Cannabis Use - California’s Commission on Peace Officer Standards and Training (“POST”) Issues Bulletin on Legislative Changes Affecting Selection Standards
Public Safety Law Blog, 12.18.2023

AALRR Attorney Presenting 2-day POST-Certified OIS Investigations Course at Rialto PD Public Safety Law Blog, 10.18.2023

AALRR Attorney Presenting 2-day POST-Certified OIS Investigations Course at Riverside PD Public Safety Law Blog, 08.09.2023

Court of Appeal Further Clarifies POBR 1-Year Statute of Limitations Public Safety Law Blog, 03.30.2023

California Court of Appeal Rules on Statute of Limitations Under POBRA Public Safety Law Blog, 02.10.2023

AALRR Attorney Presenting Two-Day POST-Certified OIS Investigations Course Public Safety Law Blog, 02.06.2023

Community & Professional
Mr. Bakhit sits on boards of numerous non-profit organizations and foundations and is currently involved with the following organizations:

Sophia’s Mission (www.sophiajmission.org), Board of Directors Cops Direct (www.copsdirect.org), Board of Directors
John H. Bakhit
p5
www.aalrr.com
IMVR (website coming soon), Board of Directors
John H. Bakhit
City Council/Financing Authority Meeting J. 2.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Discussion and possible action relating to potential revenue ballot measures for the November 2026 Election (Council Member Tejeda)
MOTION:

I move to direct staff accordingly.

DISCUSSION:

Council Member Tejeda expressed interest in new revenue sources to support City services, and in particular, to summarize three options to tax distribution centers and warehouses. Two of these options would increase an existing tax, and the third would impose a new tax to support police and fire services. At this preliminary stage, staff is providing requested general information about each option, so the discussion below is limited to basic requirements. Staff will be happy to provide more detailed information following further direction from the Council regarding which alternative it wishes to pursue, if it chooses to pursue any of them.

A. General Information re Taxes
First, all taxes in California are either “general” or “special.” (Cal. Const., art.

XIIIC, § 2.) Revenue from general taxes are placed in the General Fund and may be spent on anything the Council approves, while revenue from special taxes are earmarked for particular purposes. General taxes require simple majority approval, while special taxes must be approved by two-thirds of the voters. Further, the election on a general tax must be consolidated with a regularly scheduled general election for members of the City Council, while the City may call a special election on a special tax.

Second, taxes are distinct from other revenue measures in that the City does not need to draw a direct connection or nexus between the amount of revenue they raise and the costs they cover. California law balances this with the voter-approval requirements noted above, but the important point here is that the City need not prepare a formal nexus study or other cost-of-service analysis (either through its own staff or with assistance from a consultant) as it must for assessments and most fees. Instead, the Council may rely on routine budget and other planning processes to calculate the tax rate it asks voters to approve.

Third, the tax presented to voters does not need to have a fixed rate, but may include automatic increases on a regular schedule (e.g., annually) tied to a clearly defined formula (e.g., a fixed percent or one tethered to the Consumer Price Index). The important issue is informed consent from the voters, so the election materials presented to them must simply explain (1) that the measure before them includes future increases, and (2) how those increases will be limited.

Summary of Potential Revenue Measures.B.

The summary below reviews potential revenue measures that could be placed before voters at the November 2026 election and summarizes the associated administrative, technical, and financial considerations for each option. Please note whether each alternative is a general or special tax to inform the Council (1) how many voters must approve it, and (2) when voters may be asked to approve it.

(1) Business License Tax Adjustment for Fulfillment Centers.

In 2022, voters approved an amendment to the business license tax applicable to fulfillment centers, increasing the rate from approximately $0.047 per square foot to $0.105 per square foot (codified in Chapters 5.04 and 5.08 of the Redlands Municipal Code). The enabling ordinance also eliminated the prior provision allowing for annual adjustments based on the Consumer Price Index (CPI). At the time, annual revenues under the previous rate were estimated at $431,000, with the approved increase projected to generate an additional $530,000 annually for the General Fund ($961,000 in total).

The Council may ask voters to increase this business tax on distribution centers by raising the rate to a new fixed amount (e.g., 11 cents per square foot), by adding an escalation factor for future years (e.g., an annual increase tied to the C.P.I.), or by doing both.

Based on historical CPI performance, staff estimate this adjustment could result in additional revenue growth of approximately 2 to 5 percent per year, depending on future inflation trends. Actual revenues collected in FY 2025 from fulfillment centers were roughly $1.04 million. Using this actual revenue figure, a 3% increase (representing an average annual CPI) would yield an additional $31,200 in a given year.

This is a general tax, as its revenue is not tied to any particular use, so it must be approved by a simple majority of voters (50% plus one) at a general municipal election by the electorate that includes the election of seats on the City Council.

(2) Revision of the Existing Paramedics Parcel Assessment.

In 1985, the City’s voters renewed a special parcel tax (originally approved in 1982) to support its paramedic service. (Ord. No. 1900, § 4.) This Paramedic Tax varies based on the type and size of a parcel, and the maximum rate for commercial and industrial parcels increases by floor area as follows. - 0 to 4,999 square feet = $40
- 5,000 to 9,999 square feet = $80
- 10,000 to 19,999 square feet = $120
- 20,000 to 39,999 square feet = $160
- Greater than 39,999 square feet = $160 plus $40 for each 20,000 square-foot increment, or portion thereof, in addition to 39,999.

The current rates are all below these caps. (See Reso. No. 8682.) Over time, the costs to support paramedic service have grown to exceed this tax’s revenue, so the City has diverted general revenues from other sources to supplement it. First, therefore, the Council may ask voters to increase the Paramedic Tax to a rate that covers more or all of the City’s paramedic services.

This would free up the general revenues currently diverted to paramedic service for other uses.

The Council may consider a proposal to revise the current Paramedic Tax structure by increasing the assessment rate applicable to commercial and industrial parcels.

Second, either instead of or in addition to increasing the Paramedic Tax, the Council may ask voters to expand its uses beyond paramedic services, for example to support fire or police service. In effect, this would ask voters to transform the Paramedic Tax to a broader Public Safety tax. While this would expand its uses, it would keep the measure a special tax by continuing to limit those uses to a closed list of what the voters approve.

Third, the Council does not need to increase the rate for every parcel category, nor is it limited to the categories currently listed in the Paramedic Tax ordinance.

For example, the Council could ask voters to increase the rate for all commercial parcels, or only to increase the rate for commercial parcels larger than 39,999 square feet, or to impose a new rate just for commercial / industrial parcels dedicated to distribution centers or warehouses. The important points, again, are informed consent from the voters and a rational policy basis for any distinctions the tax makes in its rates.

Before placing such a measure on the ballot, several key steps would be required:

Fiscal and Service Level Analysis – A comprehensive cost-of-service study would be necessary to determine the appropriate assessment level needed to sustain paramedic services. Based on surveys of peer jurisdictions, the estimated cost for such a study ranges from $60,000 to $115,000.

Voter Survey and Outreach – A professionally conducted voter opinion survey and development of a strategic outreach plan are strongly recommended prior to advancing a measure. Estimated costs for these services start at $55,000.

Revenue Potential – Additional revenue projections cannot be finalized until the cost-of-service analysis has been completed.

Historically, parcel tax measures have had mixed success statewide. Of the 53 parcel tax measures placed on the ballot by cities during the last three November elections (2020, 2022, and 2024), 26 were approved, reflecting a passage rate of 49 percent.

Because this option would increase and/or expand a special tax that applies city-wide, it must be approved by two-thirds (2/3) of the City’s voters either at a general municipal or special election and the revenue would be legally restricted for a dedicated purpose, separate from the General Fund (3) New Parcel Tax for Distribution/Fulfillment Center Properties.

The final option the Council may consider is a new parcel tax on distribution/fulfillment centers and warehouses to support police and fire services, including salaries. This is permissible, just as the Paramedic Tax is permissible, and it would be imposed similarly to how that tax is imposed.

Indeed, functionally, this option would bring in the same amount of revenue from the same sources as one of the Paramedic Tax amendments discussed above:

Voter approval to impose a new rate for commercial / industrial parcels dedicated to distribution/fulfillment centers or warehouses, and to expand it into a new Public Safety special tax that may also support police and fire.

Fire protection services have been identified as one potential use of the revenues generated by this tax; however, the final determination of any dedicated purpose would be subject to City Council discussion and direction.

As with the proposed revision to the Paramedics Parcel Assessment, significant preparatory work would be necessary before advancing such a measure to the ballot:

Fiscal and Service Level Analysis – A comprehensive study would be required to determine the appropriate tax amount relative to the cost of providing the designated services. Based on peer jurisdiction surveys, estimated costs for this analysis range from $60,000 to $115,000.

Voter Survey and Outreach – A professionally conducted voter opinion survey and outreach strategy are recommended to assess public support and develop effective communications. The estimated cost for these services start at $55,000.

Revenue Potential – Revenue projections cannot be established until the specific dedicated service costs are identified.

Passage Rates – Historical experience suggests mixed outcomes for parcel tax measures. As noted above, of the 53 measures placed on the ballot by cities during the last three November elections (2020, 2022, and 2024), 26 were approved, reflecting a passage rate of approximately 49 percent.

Whether such a tax is passed as a new levy or as an amendment to the Paramedic Tax, a parcel tax may be imposed on vacant parcels. However, this would confirm the tax as a “property tax” under California law, so (1) it must be limited to specified uses, and (2) it may not be imposed ad valorem (i.e., based on a parcel’s value). The first requirement is met by limiting tax revenue to police and fire, and the second simply requires a metric other than property value — like the Paramedic Tax’s use of square feet for commercial and industrial parcels. In short, these requirements are not difficult to meet, but staff note them as legal requirements for this option.

As a special tax under state law, this measure would require approval by two-thirds (2/3) of the voters at either a general municipal or special election, and would be legally restricted for a dedicated purpose, separate from the General Fund.

C. Next Steps & Conclusion
Council is being asked at this time to consider these proposals at a conceptual level. Each potential measure carries different voter approval thresholds, revenue implications, and administrative requirements.

Each option also will involve general fund expenditures to prepare the measure for the ballot, including the retention of polling and financial consultants. While the Business License Tax adjustment represents a relatively straightforward modification to an existing revenue source, both parcel tax options would require significant preparatory work and staff time before meaningful revenue estimates could be developed.

This report is intended to provide a general overview of potential revenue options available to the City. Depending upon the City Council’s preference, staff can take a range of further actions, including returning at a future date with a more specific recommendations for a tax measure.

If the Council wishes to place a measure on the November 2026 ballot, a ballot resolution must be filed with the County Registrar of Voters no later than August 11, 2026. While cost estimates from the Registrar’s Office have been requested, they are not typically available for several weeks. In general, the costs to conduct an election are proportionately shared by the participating jurisdictions based upon the number of contests on the ballot and the number of registered voters for each contest. For reference, the City’s actual cost for placing a ballot measure on the November 2022 Statewide Direct General Election ballot was $36,802.

At this time, staff seek direction from the City Council regarding whether to pursue further work on any of the following proposals:

Business License Tax Adjustment for Fulfillment Centers – This option would reinstate annual CPI-based adjustments to the existing $0.105 per square foot rate. No additional studies would be required prior to placing this measure on the ballot.

Revision to the Existing Paramedics Parcel Assessment – If Council wishes to advance this proposal, staff would need to engage a consulting firm to conduct a comprehensive service level costing and fiscal analysis (estimated at $60,000 to $115,000) and a professional public opinion voter survey and outreach strategy (starting at $55,000).

New Parcel Tax for Warehouse and Distribution/Fulfillment Center Properties – Advancing this measure would also require a service level costing and fiscal analysis (estimated at $60,000 to $115,000) and a professional public opinion voter survey and outreach strategy (estimated at $55,000).

If desired, staff will return at a future meeting with a detailed work plan, timeline, and funding options to support any measures the Council chooses to pursue.

ALTERNATIVE:

Council may choose to reject, modify or table this item.

STRATEGIC PLAN:

Priority D: Fiscal Sustainability
SUBMITTED BY:

Eddie Tejeda, Council Member
REVIEWED BY:

Charles M. Duggan Jr., City Manager
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Christopher Boatman, Assistant City Manager
Danielle Garcia, Management Services/Finance Director

City Council/Financing Authority Meeting K. 1.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Homeless Resource Services Agreement with Many Mansions for property management services for the Project Home Key located at 1675 Industrial Ave. Redlands, CA. 92373 for an amount not-to-exceed $300,000 for a period of one year with two additional one-year renewal options for a total compensation not-to-exceed $900,000 and determine that the services provided are exempt from environmental review pursuant to Section 15061 (b)(3) of the State’s guidelines implementing the California Environmental Quality Act (Assistant City Manager Boatman) MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motion(s) is/are provided:

I move that the City Council determine approval of the homeless resource services agreement with Many Mansions for property management services for the Project Homekey and is exempt from environmental review pursuant to Section 15061(b)(3) of the State’s guidelines implementing the California Environmental Quality Act; and

1. I move that the City Council approve an agreement with Many Mansions in an amount not-to-exceed $300,000 for a period of one year with two additional one-year renewal options for a total compensation not-to-exceed $900,000.

2. RECOMMENDATION:

Staff recommends that the City Council award a homeless resource services agreement to Many Mansions for an amount not-to-exceed $300,000 for a period of one year with two additional one-year renewal options for a total compensation not-to-exceed $900,000. Staff further recommends City Council determine approval of the homeless resource services agreement is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act.

DISCUSSION:

In 2022, the City of Redlands (City) became partners in a "Project Home Key" grant-funded endeavor to convert the former Good Nite Inn into 98 studio apartments and maintain the facility as a permanent supportive housing complex for the formerly unhoused population. In order to ensure the long term success of the project, the City committed to providing annual financial support for the project for the first 7 years, totaling approximately $3.5 million dollars.

Attached is a proposed Homeless Resource Services Agreement engaging Many Mansions as a Property Management Agent (PM Agent) to oversee the operations of the "Project Homekey" permanent supportive housing facility, located at 1675 Industrial Park Ave., Redlands, CA. Under the proposed agreement, the PM Agent would be responsible for managing all aspects of the property, including leasing, rent collection, and maintenance, while ensuring compliance with local regulations and federal housing standards. Many Mansions will also administer tenant selection according to Project Homekey guidelines, prioritizing low-income households. In addition, the PM Agent would work to maintain positive tenant relations, with an emphasis on counseling and referrals, and would oversee both preventive maintenance and emergency repairs as needed.

The agreement would also require the PM Agent to comply with nondiscrimination laws, ensuring equal housing opportunities. Regular meetings with the City would be scheduled to provide updates and guidance on property management issues. The agent would collect rents, ensure lease compliance, and, when necessary, manage evictions. This arrangement is intended to ensure the efficient and professional management of the "Project Homekey" facility, supporting its mission of providing housing for vulnerable community members.

On July 24, 2025, staff issued a Request for Proposal (RFP) to qualified consultants for Property Management Services. The following consultant submitted a proposal:

1. Many Mansions, A California Nonprofit Corporation, Thousand Oaks, CA In accordance with Chapter 2.16.180 of the City's Municipal Code, a selection committee reviewed the proposal based on the consultant's demonstrated competence and professional qualifications in accordance with the specific evaluation criteria identified in the RFP. The selection committee determined that Many Mansion is a qualified consultant to complete the tasks listed in the RFP. Many Mansions proposal was for $250,841 and staff is asking to consider a $300,000 professional agreement to cover software and additional maintenance needed at the property.

ALTERNATIVES:

City Council may choose not to approve the agreement and provide staff alternate direction.

STRATEGIC PLAN:

Priority B-4 Homelessness
SUBMITTED BY:

Christopher Boatman, Assistant City Manager
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement
PREPARED BY:

Ashley Rosario, Management Analyst
Fiscal Impact
Fiscal Year: FY 2026-28
Revenue Generating: N
Appropriation Required Y/N: N
Amount: $900,000
Budgeted Y/N: Y
Account No.: 101126-126001
Discussion:

Adequate funds are allocated for the 2025-2028 Homeless Solutions Budget.

Attachments
Agreement
RFP
1 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm

AGREEMENT TO PERFORM PROFESSIONAL SERVICES

This agreement for the provision of Homeless Resource Services providing property management services for the Project Homekey facility in Redlands, California (“Agreement”) is made and entered in this 16th day of September, 2025 (“Effective Date”), by and between the City of Redlands, a mun icipal corporation (“City ”) and Many Mansions, a California nonprofit public benefit corporation (PM Agent) , (“Consultant”). City and Consultant are sometimes individually referred to herein as a “Party” and, together, as the “Parties.” In consideration of the mutual promises contained herein, City and Consultant agree as follows:

ARTICLE 1 – ENGAGEMENT OF CONSULTANT

1.1 City hereby engages Consultant to provide PM Agent to provide homeless resources including providing property management services for a Project Homekey facility located at 1675 Industrial Park Ave., Redlands, California 92374 (Facility) services for City (the “Services”).

1.2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional consultants in the industry providing like and similar types of Services.

ARTICLE 2 – SERVICES OF CONSULTANT

2.1 The Servi ces that Consultant shall perform are more particularly described in Exhibit “A,” titled “Scope of Servi ces,” which is attached hereto and incorporated herein by this reference.

2.2 Consultant shall comply with applicable federal, state and local laws and regulati ons in the performance of this A greement including, but not limited to , any applicable State prevailing wage laws.

ARTICLE 3 – RESPONSIBILITIES OF CITY

3.1 City designates make available PM Agent information in its possession that may reasonably assist PM Agent in providing the Services , as City’s representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City’s policies and decisions with respect to performance of the Services.

ARTICLE 4 – PERFORMANCE OF SERVICES

4.1 PM Agent shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Exhibit “A,” titled, “Scope of Services” (“Services”) which is attached hereto and incorporated herein by this reference.

2 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm

4.2 The term of this Agreement shall be for a period of one (1) year from the Effective Date of this Agreement (the “Initial Term”). The City shall have the option to extend the Initial Term of this Agreement by two (2) additional one -year terms (each, an “Extended Term”), on the same terms and conditions, by providing written notice to the PM Agent at least thirty (30) days prior to the expiration of the Initial Term or any Extended Term

4.3 If Consultant’s Services include deliverable electronic visual presentation materials, such materials shall be delivered in a form, and made available to Cit y, consistent with City Council-adopted policy for the same. It shall be the obligation of Consultant to obtain a copy of such policy from City staff.

ARTICLE 5 – PAYMENTS TO CONSULTANT

The compensation for Consultant’s performance of the Services shall not exceed the amount of [ Three Hundred Thousand Dollars ] ($ 300,000) for the Services provided during the Initial Term. Should this Agreement be extended, the compensation for Consultant’s performance for the Services shall not exceed the amount of [ Three Hundred Thousand Dollars] ($300,000) for the first Extended Term; and [ Three Hundred Thousand Dollars] ($300,000) for the second Extended Term, bringing the total possible amount of compensation to a not-to-exceed amount of [Nine Hundred Thousand Dollars] ($900,000). For the Initial Term and each Extended Term, City shall pay Consultant on a time and materials basis up to the not to not -to-exceed amount in accordance with the rates specified in Exhibit “ B,” titled “Price and Fee Bid ,” which is attached hereto and incorporated herein by this reference.

5.1 Consultant shall submit monthly invoices to City describing the Services performed during the preceding month. Consultant’s invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom, and a description of reimbursable expenses related to the Services. City shall pay Consultant no later than thirty (30) days after receipt and approval by City of Consultant’s invoice.

5.3 Any n otice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail, with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class, certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:

3 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
CITY: CONSULTANT:

City Clerk Rick Schroeder, President & CEO
City of Redlands Many Mansions
35 Cajon Street 1259 E. Thousand Oaks Blvd.

P.O. Box 3005 (mailing) Thousand Oaks, CA 91362
Redlands, CA 92373 [email protected]
[email protected] Phone: (805) 496-4948 X227 Phone: (909) 798-7531 Fax: (805) 497-1305

ARTICLE 6 – INSURANCE AND INDEMNIFICATION

6.1 The following insurance coverage required by this Agreement shall be maintained by Consultant for the duration of its performance of the Services. Consultant shall not perform any Services unless and until the required insurance listed below is obtained by Consultant. Consultant shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City.

A. Workers’ Compensation and Employer’s Liability insurance in the amount that meets statutory requirements with an insurance carrier acceptable to City, or certification to City that Consultant is self -insured or exempt from the workers’ compensation laws of the State of California. Consultant shall execute and provide City with Exhibit “C,” titled “Workers’ Compensation Insurance Certification,” which is attached hereto and incorporated herein by this reference, prior to performance of the Services.

B. Comprehensive General L iability insurance with carriers acceptable to City in the minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate , for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non -contributing to any insurance or self -insurance maintained by City.

C. Consultant shall secure and maintain professional liability insurance throughout the term of this Agreement in the amount of One Million Dollars ($1,000,000) per claim made.

D. Business Auto L iability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Consultant owned vehicles used in connection with Consultant’s provision of the Services, hired and non -owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non -contributing to any insurance or self-insurance maintained by City.

E. Consultant is expressly prohibited from assigning or subcontracting any of the 4 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
Services without the prior written consent of City. In the event of mutual agreement by the Parties to assign or subcontract a portion of the Services, Consultant shall add such assignee or subcontractor as an additional insured to the insurance policies required hereby and provide City with the insurance endorsements prior to any Services being performed by the assignee or subcontractor.

6.2 Consultant shall defend, indemnify and hold harmless City and its elected and appointed officials, employees and agents from and against any and all claims, losses or liability, including attorneys’ fees, arising from injury or death to persons or damage to property occasioned by any negligent act or omission by, or the willful misconduct of, Consultant, or its officers, employees and agents in performing the Services.

ARTICLE 7 – CONFLICTS OF INTEREST

7.1 Consultant covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Consultant’s Services. Consultant further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement.

7.2 Consultant agrees it is not a designated employee within the meaning of the Political Reform Act because Consultant:

A. Does not make a governmental decision whether to:

(i) approve a rate, rule or regulation, or adopt or enforce a City law; (ii) issue, deny, suspend or revoke any City permit, license, application, certification, approval, order or similar authorization or entitlement; (iii) authorize City to enter into, modify or renew a contract; (iv) grant City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) grant City approval to a plan, design, report, study or similar item; (vi) adopt, or grant City approval of, policies, standards or guidelines for City or for any subdivision thereof.

B. Does not serve in a staff capacity with City and in that capacity, participate in making a governmental decision or otherwise perform the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City’s Conflict of Interest Code under Government Code section 87302.

7.3 In the event City determines that Consultant must disclose its financial interests, Consultant shall complete and file a Fair Political Practices Commission Form 700, Statement of Economic Interests , with the City Clerk’s office pursuant to the written instructions provided by the City Clerk.
5 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm

ARTICLE 8 – GENERAL CONSIDERATIONS

8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys’ fees, including fees for the use of in-house counsel by a Party.

8.2 Consultant shall not assign any of the Services, except with the prior written approval of City and in s trict compliance with the terms and conditions of this Agreement. Any assignment or attempted assignment without such prior written consent may, in the sole discretion of City, result in City’s immediate termination of this Agreement.

8.3 Consultant is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor. Neither City nor any its agents shall have control over the conduct of Consultant or Consultant’s employees, except as herein set forth. Consultant shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Consultant are for its account only, and in no event shall Consultant or personnel retained by it be deemed to have been employed by City or engaged by City for the account of, or on behalf of City. Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind City to any obligation.

8.4 This Agreement may be terminated by City, in its sole discretion, by providing not less than five (5) days prior written notice to Consultant of City’s intent to terminate. If this Agreement is terminated by City, an adjustment to Consultant’s compensation shall be made, but (1) no amount shall be allowed for anticipated profit or unperformed S ervices, and (2) any payment du e Consultant at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Consultant. Upon receipt of a termination notice, Consultant shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of project related data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Consultant in performing the Services. Consultant shall be compensated on a pro-rata basis for Services completed up to the date of termination.

8.5 Consultant shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant pursuant to this Agreement. Such books shall be available at reasonable times for examination by City at the office of Consultant.

8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained 6 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, an y amendment to this Agreement shall be in writing, approved by City and signed by City and Consultant.

8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California , without regard to its conflicts of laws provisions. The Parties agree that all actions or proceedings arising in connection with this Agreement shall be tried and litigated only in the state courts located in San Bernardino County, California, and the federal courts located in Riverside County, California.

8.8 If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement.

IN WITNESS WHEREOF, duly authorized representatives of City and Consultant have signed in confirmation of this Agreement.

CITY OF REDLANDS MANY MANSIONS

By: ___________________________ By: _________________________ Mario Saucedo, Mayor Rick Schroeder, President & CEO

ATTEST:

___________________________
Jeanne Donaldson, City Clerk

7 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
EXHIBIT "A"

SCOPE OF SERVICES

A. BACKGROUND INFORMATION
The property is a Homekey Program housing facility located at 1675 Industrial Park Ave., Redlands, California 92374. Serving formerly homeless individuals and represents a critical component addressing homelessness through dignified, stable housing solutions.

B. PROJECT DESCRIPTION
The property management company will be responsible for the day-to-day operations, maintenance, program monitoring, compliance with the Regulatory Agreement and other funding source requirements, compliance with tenant rental and income limits, and administration of a permanent housing facility that includes but is not limited to:
• Residential units
• Common areas and community spaces
• On-site laundry facilities
• Security systems
• Parking facilities
• Outdoor spaces

C. SERVICES
The selected property management company will be responsible for:

1.Property Operations:
a. Maintain 24/7 property coverage, including an on-site resident manager b. Provide immediate communication to City staff in case of emergency c. Implement and maintain a comprehensive maintenance program d. Coordinate with service providers
e. Manage unit turnover and preparation
f. Ensure compliance with all applicable housing regulations and requirements g. Maintain safety and security protocols
h. Coordinate pest control and janitorial services
i. Contract with and manage vendors, including but not limited to: Plumbing, HVAC, Electrical, Fire Alarm, Security, Janitorial, and Landscaping in compliance with applicable procurement and prevailing wage laws and regulations.
j. Provide detailed and timely accounting for all expenses incurred, including but not limited to maintaining a record of all hourly work completed by employees and vendors, bills received, and supplies ordered in connection with maintaining and operating the property.

2. Financial Management
a. Collect and process resident rent payments
b. Calculate tenant rental portion in accordance with state and federal laws and regulations. c. Maintain accurate financial records and provide monthly reports d. Prepare and manage the operating budget and expenses e. Process vendor payments
8 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
f. Maintain required insurance coverage
g. Establish a segregated bank account for operating expenses for the purpose of maintaining funds available for property management, general maintenance, payments for supplies, equipment and services associated with maintaining and operating the property.

3. Resident Services
a. Process tenant applications, accept referrals from the Coordinated Entry System (CES) if and where required, and maintain waiting lists
b. Conduct move-in/move-out inspections
c. Respond to maintenance requests
d. Maintain resident files and records
e. Facilitate communication between residents and service providers f. Ensure compliance with Fair Housing laws
g. Comply with the Coordinated Entry System for placement of residents.

4. Facility Maintenance
a. Perform routine preventive maintenance
b. Coordinate repairs and replacements
c. Maintain building systems (HVAC, plumbing, electrical) d. Maintain ground maintenance and landscaping
e. Manage waste disposal and recycling programs
f. Conducts procurement for all service contracts and staffing following City procurement policies.
g. Assure that, where applicable, state prevailing wages are paid for work performed onsite based on the requirements of the applicable funding sources related to this property.

5. Project Homekey/HCD Requirements
PM Agent acknowledges to lease units in accordance with the project guidelines of the Project HomeKey Program administered by HCD.

a. Project Home-Key Specific Lease Provisions including the following:

Redlands Good Nite Inn
1675 Industrial Park Ave
Redlands, CA 92374

County of San Bernardino
Assessor Parcel Number (APN)
0292-063-38
# of
Bedrooms
Units Non-
Homekey
Units
Homekey
Assisted
Units
All Income
Limit
Restriction to Subset of
Target Population
Manager
Unit
1 0 1 N/A N/A
0 (Studio) 37 0 37 30% At Risk of Homelessness
0 (Studio) 25 0 25 30% Chronically Homeless
0 (Studio) 36 0 36 30% N/A
Totals: 99 0 99 N/A N/A

9 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
b. PM Shall ensure that at least twenty five percent (25%) of the Project's Assisted Units are restricted to occupancy by the Chronically Homeless and PM shall ensure that at least fifty percent (50%) of the Project Assisted Units are restricted to occupancy by the Homeless.

6. The City shall furnish PM Agent with written descriptions of such requirements as they relate to PM Agent's leasing property management and fiscal management duties hereunder. Incident thereto, the following provisions shall apply:
a. PM Agent shall, prior to approving each rental application and prior to allowing prospective tenants to take occupancy, require each prospective tenant household to complete required forms and provide documentation to qualify application for residency. All applications will be submitted to Step Up's Compliance Department for approval.
b. The Compliance Department will verity program guidelines are followed. A Tenant Income Certification, Managers Certification, and Calculation sheet will be used to confirm annual income. c. PM Agent is authorized without the City's prior consent to update forms, policies, and procedures to adhere to Project Homekey/HCD guidelines.

d. Without the City's prior written consent, PM Agent shall not enter into any lease on behalf of the City to a tenant household who fails to meet the income eligibility requirements for Project Homekey.

e. PM Agent shall maintain and preserve all written records of tenant income and household size, and any other information reasonably requested by the City in writing in connection with the Project HomeKey, throughout the term of the Agreement, and shall turn all such records over to the City upon the termination or expiration of this Agreement or upon written request of Owner.

f. PM Agent shall, to the extent such is within th e scope of its authority and duties hereunder, comply with all leasing, management, reporting, and similar requirements in connection with the Project Homekey/HCD, whether such requirements be from a monitoring agency or any branch of government

g. PM Agent shall cause the building to be maintained in compliance with all local health, safety, and building codes to the extent of available funds, and shall promptly give written notice to the City if PM Agent receives notice of any such code violation relating to the building.

10 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
EXHIBIT "B"
Rate Sheet

Fee Base Units Monthly $ Annual $
Property
Management
$81 PUPM 98 $7,938 $95,256
Financial
Management
$13 PUPM 98 $1,274 $15,288
Total $9,212 $110,544

Staff FTE Rate (Hourly) Hours
(Annual)
Annual $
Property
Management

1.0 $28.00 $2,080 $56,240
Maintenance
Tech

1.0 $27.00 $2,080 $56,160
Subtotal $112,400
*Total Benefits, Taxes, etc. $27,897
Total $140,297

*Payroll Taxes & Benefits include employer taxes, mileage reimbursements, and benefits.

Area Amount
Fees $110,544
Reimbursed Personnel Costs $140,297
Total $250,841

11 I:\cmo\Agreements\Many Mansions FY2526-024.doc-wm
EXHIBIT “C”

WORKERS’ COMPENSATION INSURANCE CERTIFICATION

Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:

(a) By being insured against liability to pay compensation by one or more insurer s duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer , or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self -insure and to pay any compensation that may become due to his or her employees.

CHECK ONE

_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self - insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).

_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self -insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

MANY MANSIONS

By: Date: ___________________
Rick Schroeder, President & CEO

City Council/Financing Authority Meeting K. 2.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of the 2025-2026 Community Development Block Grant (CDBG) in the amount of $326,470 from the County of San Bernardino, approve an additional appropriation of the same, and adopt Resolution No. 8715 authorizing the City Manager, or designee, to execute the Grant Agreement and all other related documents (Development Services Director Desatnik)
MOTION(S):

If the City Council determines that staff's recommendations are appropriate, the following motions are provided:

I move that the City Council accept the 2025-2026 Community Development Block Grant funding award in the amount of $326,470; and

1. Authorize an additional appropriation of $326,470 for the 2025-2026 CDBG fiscal year; and

2. I further move to adopt Resolution No. 8715 authorizing the City Manager, or designee, to execute agreements, amendments and other related documents associated with the 2025-2026 CDBG Program Year.

3. RECOMMENDATION:

Staff recommends that the City Council accept the grant award for the 2025-2026 CDBG Program Year from the County of San Bernardino in the amount of $326,470 and adopt Resolution No. 8715 authorizing the City Manager, or designee, to execute agreements, amendments and other related documents associated with the 2025-2026 CDBG Program Year.

DISCUSSION:

In January 2025, the Development Services Department (Department) submitted the 2025-2026 CDBG Program Year grant funding request on behalf of the City of Redlands (City) to the County of San Bernardino (County) for the amount of $326,470. In March 2025, the County submitted the 2025-2026 Annual Action Plan Consolidated Submission for HUD Housing and Community Development Grants to the Department of Housing and Urban Development (HUD). On August 6, 2025, the City was notified of the final 2025-2026 CDBG final funding award for six (6) total projects that were approved by City Council on December 17, 2024, (Item No. L.5.) of which five (5) projects are community-based organizations and one (1) is a Capital Improvement Project (CIP). The final award and amounts are as follows:

Final Approved Projects/Programs Award
Amount
Redlands Sylvan Park Restroom & ADA Improvements $279,770 FSA of Redlands - Housing and Food Program $ 9,340
Boys and Girls Club - Family Strengthening Program $ 9,340 YMCA of the East Valley - Legal Services $ 9,340
Girls on the Run - Youth Fitness Program $ 9,340
Partners Against Violence - Supportive Services for Victims of Violence
$ 9,340
Resolution No. 8715 authorizes the City Manager, or designee, to execute the agreements, any amendments and other related documents associated with the 2025-2026 CDBG Program Year grant funding.

ALTERNATIVES:

City Council may elect not to approve these actions. However, electing not to approve these actions may result in a loss or reduction of CDBG funding and impacts on existing and future CDBG projects.

STRATEGIC PLAN:

Not applicable.

SUBMITTED BY:

Brian Desatnik, Development Services Director
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Christopher Boatman, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Tricia Munoz, Development Services/Management Analyst

Fiscal Impact
Fiscal Year: 2025-2026
Revenue Generating: N
Appropriation Required Y/N: Yes
Amount: $326,470
Budgeted Y/N: No
Account No.: 200164
Discussion:

Acceptance of this award will increase the FY 2025-2026 appropriation for Planning Grants (200164) by $326,470. Approval of this item has no impact on the General Fund.

Attachments
Resolution for 2025-2026 CDBG Funding
Additional Appropriation Form
Award Notification
CBO Project Listing
2025-2026 Program Funding Request
1 I:\cmo\Resolutions\8715 Development Block Grant Program 2025-26.docx-wm RESOLUTION NO. 8715

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS

AUTHORIZING THE GRANT ACCEPTANCE AND EXECUTION OF THE

GRANT FUNDS FROM THE COUNTY OF SAN BERNARDINO COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR THE 202 5-26 PROGRAM YEAR

WHEREAS, the City of Redlands (“City”) is eligible to receive federal funding for certain community development block grants, through the County of San Bernardino Community Development and Housing Department (“County”); and

WHEREAS, the City is a participating jurisdiction in the San Bernardino County Final 2025-2026 Annual Action Plan of the 2020 -2025 Consolidated Plan of the HUD Housing and Community Development Grant Programs; and

WHEREAS, the County issued a Notice of Funding Availability (“NOFA”) dated September 24, 2024, for the 2025-2026 Community Development Block Grant Program Year (“CDBG”); and

WHEREAS, the County has been delegated the responsibility for the administration of this grant program, establishing necessary procedures; and

WHEREAS, the City Council of the City of Redlands (this “City Council”) desires to execute agreements with Community Based Organizations (CBOs) who submitted applications for 2025-2026 CDBG Program Year to provide public services as described in the 2025-2026 CDBG NOFA; and

WHEREAS, the City has been granted to receive a CDBG grant award of $326,470; and

WHEREAS, this City Council wishes to delegate authorization to execute the grant agreement, subrecipient agreements, any amendments, and other related documents thereto to the City Manager or his designee; and

WHEREAS, the City has the legal authority and is authorized to enter into a funding agreement with the County of San Bernardino.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF REDLANDS , WITH ACKNOWLEDGEMENT OF DEVELOPMENT SERVICES, AS FOLLOWS:

Section 1. The above recitals are true and correct and are incorporated herein by this reference.

Section 2. Pursuant and subject to all the terms and provisions of the County of San Bernardino Community Development Block Grant Program, the City Manager of the City of Redlands, or designee is hereby authorized and directed to accept funding from the County of San Bernardino and take such other actions necessary to receive and administer the grant funding. 2 I:\cmo\Resolutions\8715 Development Block Grant Program 2025-26.docx-wm Section 3. The City Manager of the City of Redlands, or designee is hereby authorized and directed to execute the funding agreement s, any amendments, and other related documents thereto with the County of San Bernardino and subrecipients of the program funding.

Section 4. The City Manager of the City of Redlands , or designee is hereby authorized and directed to submit any required documents, funding requests, and reports required for the grant funding.

Section 5. The City Manager of the City of Redlands , or designee, is designated to represent the City in carrying out the responsibilities under the grant agreement, including certifying disbursement requests on behalf of the City and compliance with applicable state and federal laws.

Section 6. The City certifies that the project will comply with any laws and regulations including, but not limited to, the California Environmental Quality Act (CEQA), legal requirements for building codes, health and safety codes, the California Labor Code, disabled access laws, and, that prior to commencement of the project, all applicable permits will have been obtained.

Section 7 . Applicant acknowledges and agrees that it shall be subject to the terms and conditions specified in the Agreement, and that the NOFA and Application are incorporated in the Agreement by reference and made a part thereof. Any and all activities, expenditures, information, and timelines represented in the Application are enforceable through the Agreement. Funds are to be used for the allowable expenditures and activities identified in the Agreement.

Section 8. Effective Date. This Resolution shall become effective immediately

ADOPTED, SIGNED AND APPROVED this 16th day of September 2025

________________________
Mario Saucedo, Mayor

ATTEST:

___________________________
Jeanne Donaldson, City Clerk

3 I:\cmo\Resolutions\8715 Development Block Grant Program 2025-26.docx-wm I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution No. 8715 was duly adopted by the City Council at a regular meeting thereof held on the 16th day of September 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

_________________________________
Jeanne Donaldson, City Clerk

From: CDBG, Info
To: Tricia Munoz
Cc: Graham, Kelly
Subject: CDBG Program Award Notification – Program Year 2025–26 Date: Wednesday, August 6, 2025 9:18:06 AM
Attachments: image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
Redlands 2025-26 CBO Projects.pdf
[NOTICE:  This message originated outside of City of Redlands -- DO NOT CLICK on links or open attachments unless you are sure the content is safe.] Dear Ms. Munoz,
We are pleased to inform you that the following programs have been approved for Community Development Block Grant (CDBG) funding as part of San Bernardino County’s Program Year (PY) 2025–26 Annual Action Plan:

Project
Number
Approved
Program
Award
Amount
REDL-25-
1-
03F/0331
Redlands: Sylvan
Park Restroom
Replacement and
ADA
Improvement
Project
$279,770
REDL-25-
1-
05C/7511
Redlands: Legal
Services - YMCA
of the East Valley
$9,340
REDL-25-
1-
05G/7538
Redlands:

Supportive
Services for
Victims of
Violence -
Partners Against
Violence
$9,340
REDL-25-
1-
05Q/7512
Redlands:

Housing and
Food Program –
FSA of Redlands
$9,340
REDL-25-
1-
05W/0283
Redlands: Family
Strengthening
Program - Boys
and Girls Club
$9,340
REDL-25-
1-
05Z/0332
Redlands: Girls
on the Run
$9,340

Please review the following next steps to ensure timely execution of your CDBG‑funded activities:

Preparation of Attachment A & B Agreements
In the coming weeks, our office will prepare the Attachment A&B documents for each approved activity. These agreements must be signed before any CDBG-funded work may begin. Once received, please review the drafts carefully. If no changes are needed, sign and return them promptly. Our goal is to have all agreements fully executed by August 29, 2025.

Contracts with Community‑Based Organizations
Several of the City’s approved CDBG activities involve public service programs to be delivered by Community-Based Organizations (CBOs). The City is responsible for initiating and executing contracts with each CBO to carry out these services. CDH can provide a sample agreement upon request. A list of the approved CBO partners is attached for your reference. Please ensure that copies of all executed agreements are submitted to CDH for monitoring purposes.

Compliance and Grant Requirements
Please be advised that no construction or service activity may begin—and no costs may be incurred—until the Attachment A&Bs have been signed by CDH. This requirement is mandated by HUD and County contracting policy. Any expenses incurred before execution are not eligible for reimbursement, and any work performed in anticipation of funding is at the City’s own risk.

If you have any questions or need assistance during this process, please contact Kelly Graham at (909) 501-0626 or [email protected] .

Thank you for your continued partnership. We look forward to supporting your efforts throughout the upcoming program year.

Sincerely,
Community Development Division
Community Development Block Grant
Community Development and Housing Department
https://cdh.sbcounty.gov/
Phone: 909-501-0600
560 E. Hospitality Lane, Suite 200
San Bernardino, CA 92415-0043

Our job is to create a county in which those who reside and invest can prosper and achieve well-being. www.SBCounty.gov

County of San Bernardino Confidentiality Notice: This communication contains confidential information sent solely for the use of the intended recipient. If you are not the intended recipient of this communication, you are not authorized to use it in any manner, except to immediately destroy it and notify the sender.

City of Redlands
2025-26 CDBG CBO Projects
Project # Project Title Amount
Awarded Applicant
REDL-25-1-05C/7511 Redlands: YMCA of the East Valley - Legal Services $9,340 Brandi Collato, Chief Executive Officer
YMCA of the East Valley
500 E. Citrus Avenue
Redlands, CA 92373
[email protected]
909-798-9622 ext. 7107
REDL-25-1-05G/7538 Redlands: Supportive Services for Victims of Violence - PAV $9,340
Cassandra Black, Associate Director of
Operations
Partners Against Violence
444 N. Arrowhead Ave, Ste. 101
San Bernardino, CA 92401
[email protected]
909-885-8884
REDL-25-1-05Q/7512 Redlands: Housing and Food Program - FSA of Redlands $9,340
Kyra Stewart, Executive Director
612 Lawton Street
Redlands, CA 92374
[email protected]
9097932673
REDL-25-1-05W/0283 Redlands: Boys and Girls Club - Family Strengthening Program $9,340
Michael Wells, Chief Executive Director
Boys & Girls Club of Greater Redlands -
Riverside
1251 Clay St.

Redlands, CA, 92374
[email protected]
909-798-4599
REDL-25-1-05Z/0332 Redlands: Girls on the Run $9,340
Molly Widdicombe, Council Director
Girls on the Run Inland Empire
P.O. Box 21044
Riverside, CA 92516
mollywiddicombe@girlson the run.org
(951) 394-3141

City Council/Financing Authority Meeting K. 3.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Sole Source Procurement and Memorandum of Understanding (MOU) between the City of Redlands and the Apple Valley Fire Protection District for outfitting services of Fire Department light fleet emergency vehicles for a not-to-exceed amount of $500,000 over the initial and extended terms (Fire Chief Sessler)
MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:

I move that the City Council approve a Sole Source Procurement via Memorandum of Understanding (MOU) Between the City of Redlands and the Apple Valley Fire Protection District for Outfitting Services of Fire Department light fleet emergency vehicles for a not-to-exceed amount of $500,000 over the Initial and Extended Terms.

RECOMMENDATION:

Staff recommends City Council's approval of a Sole Source Procurement via Memorandum of Understanding (MOU) Between the City of Redlands and the Apple Valley Fire Protection District for Outfitting Services of Fire Department light fleet emergency vehicles for a not-to-exceed amount of $500,000 over the Initial and Extended Terms to expedite the installation of essential emergency equipment, addressing delays experienced with other vendors. By utilizing Apple Valley Fire Protection District's fleet service resources, the City can ensure a quicker, more efficient deployment of fully equipped emergency vehicles, enhancing operational readiness.

DISCUSSION:

The Redlands Fire Department operates a fleet of light emergency vehicles used by Chief Officers, including Battalion Chiefs, for incident command and emergency response. When these vehicles are acquired, they must be outfitted with specialized equipment, such as emergency lights, sirens, and radios, to ensure they are fully prepared for immediate deployment in emergency situations.

The Apple Valley Fire Protection District has a dedicated fire emergency vehicle and apparatus mechanic to meet these outfitting and maintenance needs. Their familiarity with the unique requirements of fire emergency vehicles, combined with their proven ability to provide quicker turnaround times than private vendors previously used by the City, establishes them as the most qualified provider of these services.

Staff has also reviewed Apple Valley Fire Protection District’s pricing for outfitting services and determined the rates to be fair and reasonable when compared to industry standards and the City’s past experience with private vendors. Accordingly, staff is recommending the approval of Apple Valley Fire Protection District as a sole source provider for vehicle outfitting services.

This Memorandum of Understanding (MOU) establishes a one-year Initial Term with the option of four additional one-year extensions, for a total possible term of five years, between the City of Redlands and Apple Valley Fire Protection District for the outfitting of the Fire Department's light fleet vehicles. Through this agreement, the City will gain access to specialized services that streamline the outfitting process, reduce costs, and improve turnaround times—especially when compared to private vendors currently experiencing delays.

By leveraging Apple Valley’s expertise, the City of Redlands can ensure its Fire Chief Officers’ vehicles are equipped and deployed more efficiently, thereby enhancing emergency response readiness in a cost-effective and reliable manner.

ALTERNATIVES:

The City Council may choose not to approve the Memorandum of Understanding for Light Fleet Vehicle Outfitting Services and provide staff with alternate direction.

STRATEGIC PLAN:

Priority B- Public Health
SUBMITTED BY:

Rich A. Sessler, Fire Chief
RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:

Bruni Reyes, Management Analyst
Fiscal Impact
Fiscal Year: FY 2025-26
Discussion:

The total not-to-exceed amount for the Initial Term of the agreement is $250,000 over 1 year. The value of the remaining four one-year Extended Terms is $250,000 combined. Actual spending will vary based on the specific outfitting services required for each vehicle. The Fire Department has allocated funds through the mid-biennium budget process to cover expenses for the initial term. Any additional funding, if needed, will be requested in the upcoming Biennial Budget on an as-needed basis. All costs will be paid directly to the Apple Valley Fire Protection District in accordance with City purchasing guidelines.

Attachments
Sole Source Form
MOU

1 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF

REDLANDS AND THE APPLE VALLEY FIRE PROTECTION

DISTRICT FOR LIGHT FLEET OUTFITTING SERVICES
This Memorandum of Understanding ("MOU") for Light Fleet Outfitting Services is dated this 16th day of September, 2025 (“Effective Date”) and is entered into by and between the Apple Valley Fire Protection District (the “District”) a fire protection district duly authorized and existing pursuant to California Health & Safety Code Section 13800, et seq., and the City of Redlands (the "City"), a municipal corporation and general law city. The District and the City may be referred to herein individually as a "Party" and, together as the "Parties."

RECITALS
WHEREAS, the City of Redlands Fire Department operates certain light fleet emergency vehicles used by Chief Officers for emergency response and incident command; and WHEREAS, the City light fleet vehicles, once purchased, require the installation of emergency lighting, sirens, and radios; and
WHEREAS, the District has a dedicated fire emergency vehicle and apparatus fleet mechanic to address the outfitting and maintenance needs of their emergency vehicles; and WHEREAS, the District is willing to provide the outfitting services to other fire agencies with the intent to promote the efficient use of public resources; and WHEREAS, by entering into this MOU, the City will gain access to the District’s specialized resources and services, ensuring that Chief Officer vehicles maintain operational readiness; and
WHEREAS, District and City execute this MOU for the purpose of formalizing the terms and conditions governing the provision of light fleet vehicle outfitting services.

NOW, THEREFORE, in consideration of the above recitals and the mutual covenants hereinafter contained, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the Parties agree as follows:

AGREEMENT
Section 1. Incorporation of Recitals. The above recitals are true and correct and are hereby incorporated into this MOU by this reference.

Section 2. Term. The term of this MOU shall be for a period of one (1) year from the Effective Date set forth above (the “Initial Term”). The City shall have the option to extend the Initial Term of the MOU by four (4) additional one-year terms (“Extended Terms”), on the same terms and conditions, by providing written notice to the District at lest thirty (30) days prior to the expiration of the Initial Term.
2 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

Section 3. Compensation. The compensation for the District’s Services shall not exceed the amount of Two Hundred Fifty Thousand Dollars ($250,000) for the Services provided during the Initial Term. Should this Agreement be extended, the compensation for the District’s performance for the Services shall be allocated across the four possible Extended Terms, bringing the total possible amount of compensation to a not-to-exceed amount of Five Hundred Thousand Dollars ($500,000). All payments shall be made on a time and materials basis for Services performed, subject to the limits stated herein.

Section 4. Authority. Unless otherwise specified herein, all authority to act on behalf of the City pursuant to this MOU shall be exercised by Fire Chief Rich Sessler, or his designee.

Unless otherwise specified herein, all authority to act on behalf of the District pursuant to this MOU shall be exercised by Fire Chief Buddy Peratt or his designee.

Section 5. Outfitting Services

A. Under this MOU, District will provide Light Fleet Outfitting Services for the City’s light fleet emergency vehicles, which are primarily utilized by Chief Officers, including Battalion Chiefs, for emergency response and incident command. These services will ensure that the vehicles are fully equipped to meet the operational demands of em ergency situations. The District's outfitting services will include the installation of essential emergency equipment such as lighting, sirens, and radios, ensuring that vehicles are highly visible and capable of effective communication in the field. Addit ionally, the District will mount specialized equipment required for emergency response operations, tailoring each vehicle to meet the specific needs of the Redlands Fire Department. The Services also include the integration of advanced communication and technology systems, enhancing situational awareness and coordination during incidents. Furthermore, vehicles will be customized to align with the operational requirements of the Redlands Fire D epartment, ensuring efficiency and readiness. Any additional outfitting requests or modifications beyond the scope described above may be incorporated as mutually agreed upon by both parties, allowing for flexibility to meet the evolving needs of the Redlands Fire Department.

Section 6. City Responsibilities . The City shall be solely responsible for all of the following, including, without limitation, any accompanying cost or expense:

A. Provide vehicles to the District for outfitting services in accordance with a mutually agreed-upon schedule.

B. Specify the required outfitting configurations, including equipment layout and operational functionality.

C. Coordinate with the District regarding the procurement of any necessary outfitting equipment not supplied by City. Such equipment may be obtained by the District upon mutual agreement by both parties, including prior written approval of associated costs.

3 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

D. Review and approve completed work before acceptance.

E. Ensure timely payment for services rendered as outlined in this MOU.

Section 7. District Responsibilities. The District shall be solely responsible for all of the following, including, without limitation, any accompanying cost or expense:

A. Provide the necessary personnel, including a fire vehicle/apparatus fleet mechanic, to perform the outfitting services.

B. Ensure all installations meet applicable safety standards and industry best practices.

C. Perform outfitting services within a reasonable timeframe as agreed upon by both parties.

D. Provide documentation of work completed, including an itemized invoice or a detailed breakdown of services rendered.

E. Invoice the City in accordance with the agreed-upon payment terms.

F. Storing Equipment overnight at secure facilities owned and controlled by the District when the District is in possession and control of the light fleet vehicles.

Section 8. Indemnification. To the fullest extent permitted by law, the District (the "Indemnifying Party") shall defend, indemnify, and hold harmless the City (the "Indemnified Party"), including its elected and appointed officials, officers, employees, agents, and volunteers, from and against any and all claims, demands, ca uses of action, costs, expenses, liabilities, losses, damages, or injuries, including, but not limited to, reasonable attorneys’ fees and legal costs, arising out of or related to the performance of Light Fleet Outfitting Services pursuant to this M OU. Th is includes, without limitation, claims relating to property theft, damage or destruction, personal injury, or wrongful death, in any way connected to the custody, delivery, modification, installation, or servicing of fleet equipment by the Indemnifying Party or its employees, agents, or contractors, except to the extent such claims result solely from the willful misconduct of the Indemnified Party.

The Indemnifying Party shall, at its own cost and expense, defend any and all such claims, suits, or legal proceedings brought against the Indemnified Party, using legal counsel reasonably acceptable to the Indemnified Party. The Indemnifying Party shall be responsible for any resulting judgments, awards, or settlements, and sha ll reimburse the Indemnified Party for any and all legal expenses incurred in connection with such matters or in enforcing this indemnity provision.

4 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

Section 9. This indemnification is not limited by the availability or scope of insurance coverage and shall survive the termination or expiration of this MOU.

Section 10. Insurance.

A. Time for Compliance. District shall not begin performing any Light Fleet Outfitting Services under this MOU unless and until it has provided evidence satisfactory to the City that it has obtained all insurance coverage required under this section, or that it is self-insured in a manner acceptable to the City.

B. Minimum Requirements. The District shall, at its expense, procure and maintain for the duration of this MOU insurance against all claims for injuries to persons or damages to property which may arise from or in connection with the performance of this MOU by the District, its elected and appointed officials, officers, employees, and volunteers. Such insurance shall meet at least the following minimum levels of coverage, or the District shall be self -insured to the satisfaction of the City:

i. Minimum Limits of Insurance. District shall maintain limits no less than:
(1) General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this MOU or the general aggregate limit shall be twice the required occurrence limit. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract" language will not be accepted; (2) Automobile Liability: $1,000,000 per accident for bodily injury and property damage; and (3) Workers' Compensation and Employer's Liability: Workers' Compensation limits as required by the Labor Code of the State of California. Employer's Liability limits of $1,000,000 per accident for bodily injury or disease.

ii. Endorsements. Each policy shall be endorsed to state that: (1) the City and its directors, officials, officers, employees, and volunteers shall be covered as additional insured with respect to the use, operation or transport the Equipment performed by or on behalf of the District; and (2) the insurance coverage shall be primary insurance as respects the City and its directors, officials, officers, employees, and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of City’ scheduled underlying coverage. Any insurance or self-insurance maintained by the City and its directors, officials, officers, employees, and volunteers shall be excess of such insurance obtained by the District and shall not be called upon to contribute in any way. The insurer shall agree to waive all rights of subrogation against the City and its directors, officials, officers, employees, and volunteers for losses paid under the terms of the insurance policy which arise from the performance of Light Fleet Vehicle Outfitting Services by the District. Each insurance policy shall also be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City as applicable; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect 5 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

coverage provided to the City and its directors, officials, officers, employees and volunteers. There shall be no cross -liability exclusion for claims or suits by one insured against another.

Requirements of specific coverage features, or limits contained in this section are not intend ed as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance.

Section 11. Termination. This MOU shall commence on the Effective Date set forth above, and shall remain in effect for a period of five (5) years , unless terminated earlier by either Party as outlined below.
i. Either party may terminate this MOU with thirty (30) days’ written notice to the other party.

ii. In the event of termination, the City shall compensate he District for any services completed prior to the termination.

iii. This MOU may be renewed or amended upon mutual agreement by both parties in writing.

Section 12. Notices. Any notice or other communication required, or which may be given, pursuant to this Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date of delivery in person; (ii) five (5) days after deposit in first class registered mail , with return receipt requested; (iii) on the actual delivery date if deposited with an overnight courier; or (iv) on the date sent by facsimile or electronic mail transmission (including PDF), if confirmed with a copy sent contemporaneously by first class , certified, registered or express mail; in each case properly posted and fully prepaid to the appropriate address set forth below, or such other address as a Party may provide notice in accordance with this section:

If to the City: Redlands Fire Department
35 Cajon Street, Suite 12, Redlands CA 92373
Attn: Fire Chief Rich Sessler
If to District: Apple Valley Fire Protection District
22400 Headquarters Drive, Apple Valley, CA 92307
Attn: Fire Chief Peratt

Section 13. Miscellaneous Terms.

A. Representation and Warranties. City and the District have all requisite power and authority to execute and perform this MOU. Each person executing this MOU warrants that he or she has the legal power, right, and authority to execute this MOU and bind his or her respective Party.

B. Governing Law. This MOU shall be governed by and construed in accordance with the laws of the State of California. Venue shall be in San Bernardino County.

6 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

C. Relationship of the Parties. Nothing contained in this MOU shall be construed as creating a joint venture, partnership, or any other similar arrangement between the Parties. No Party to this MOU shall be deemed to be a representative, an agent, or an employee of the other Party. Unless otherwise expressly specified in this MOU, no Party shall have any authority or right to assume or create any obligation of any kind or nature, express or implied, on behalf of, or in the name of, any other Party, nor bind any other Party in any respect, without the specific prior written authorization of the other Party.

D. Waiver. No Party shall be deemed to have waived any provision of this MOU unless such waiver is in writing and signed by such Party.

E. Legal Compliance. The Parties shall comply with all applicable Federal, State, and local laws and regulations related to the transactions set forth in, or referenced by, this MOU.

F. Third-Party Beneficiary. No claim as a third-party beneficiary under this MOU by any person, corporation, or any other entity, shall be made or be valid against the District or the City.

G. Headings. The section headings used in this MOU are for convenience only and shall not be deemed to limit, construe, affect or alter the meaning of this MOU.

H. Entire Agreement. This MOU constitutes the entire agreement between the Parties with respect to the matters contained herein, and shall supersede and replace any and all other prior understandings, correspondence, and agreements, oral or written, between the Parties with respect thereto. No change, amendment or modification of this MOU shall be valid or binding upon the Parties unless such change, amendment, or modification is in writing and duly executed by all Parties.

I. Assignment or Transfer. The City shall not assign, hypothecate, or transfer, either directly or by operation of law, this MOU or any interest he rein without the prior written consent of the District. Any attempt to do so shall be null and void, and any assignees, hypothecates, or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation, or transfer.

J. Binding Effect. The terms of this MOU shall inure to the benefit of, and shall be binding upon, each of the Parties and their respective successors and assigns.

K. Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this MOU shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforce ability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this MOU which are hereby declared as severable, and shall be interpreted to carry out the intent of the Parties hereunder.
7 I:\cmo\Agreements\MOU with Apple Valley Fire Protection District (Light Fleet Outfitting Services) FY2526-019(v.3).docx-ms

L. Cooperation: Further Acts. The Parties shall reasonably cooperate with one another and shall take any additional acts or sign any additional documents as may be necessary, appropriate, or convenient to attain the purposes of this MOU.

M. Counterparts. This MOU may be signed in counterparts, each of which shall constitute an original.

IN WITNESS WHEREOF, the Parties have executed this MOU for Light Fleet Emergency Vehicle Outfitting Services as of September 2, 2025.

Apple Valley Fire Protection District City of Redlands

By: By:

Buddy Peratt, Fire Chief Mario Saucedo, Mayor

Date: Date:

ATTEST:

By:

Jeanne Donaldson, City Clerk

City Council/Financing Authority Meeting K. 4.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Resolution of Intention to approve an amendment to the contract between the Board of Administration of the California Public Employees' Retirement System and the City Council of the City of Redlands (Human Resources/Risk
Management Director Meteau)
MOTION(S):

If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:

I move the City Council adopt a Resolution of Intention to approve an amendment to the contract between the Board of Administration of the California Public Employees' Retirement System and the City Council of the City of Redlands to remove the hourly exclusion language from the contract.

RECOMMENDATION:

Staff recommends that the City Council adopt a Resolution of Intention to approve an amendment to the contract between the Board of Administration of the California Public Employees' Retirement System and the City Council of the City of Redlands to remove the hourly exclusion language from the contract.

DISCUSSION:

The City is required to adopt a Resolution of Intention as the initial step in the formal amendment process. The proposed amendment seeks to remove the current language excluding hourly employees from CalPERS membership, which is currently embedded in the contract between the City and the CalPERS Board of Administration.

Adoption of the Resolution of Intention initiates the amendment process. The next step is for the City to introduce and adopt an Ordinance authorizing the amendment to the contract, which then allows CalPERS to proceed with the preparation of the final amendment documents for consideration at a future City Council meeting.

Staff proposes adopting the Resolution to remove the exclusion of all hourly employees and utilize exclusion criteria under Government Code Section 20305. This provision allows a public agency to exclude employees based on specific service thresholds, provided those employees do not have prior CalPERS membership. It is CalPERS' recommendation to remove the exclusion and utilize Government Code section 20305.

Under Government Code Section 20305, CalPERS membership would be triggered once an employee completes either:
125 days of service if employed on a per diem basis, or 1,000 hours of service if employed on a basis other than per diem, within a single fiscal year.

This change aligns the City with standard CalPERS eligibility rules and provides a consistent framework for determining membership eligibility for hourly employees.

ALTERNATIVES:

The City Council may choose to take no action. However, this would result in no changes to the City's contract with CalPERS and would not consider the recommendation provided directly by CalPERS.

STRATEGIC PLAN:

Not applicable.

SUBMITTED BY:

Robert Meteau, Human Resources/Risk Management Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:

Kisha McDonald, Human Resources Manager

Fiscal Impact
Discussion:

There is no fiscal impact associated with the contract amendment.

Attachments
Resolution of Intention
Certification of Governing Body

CalPERS-CON-12 Page 1 of 1
California Public Employees’ Retirement System www.calpers.ca.gov Financial Office | Pension Contracts & Prefunding Programs Division 888 CalPERS (or 888-225-7377) P.O. Box 942715, Sacramento, CA 94229-2715 TTY: (877) 249-7442

Certification of Governing Body’s Action
I hereby certify that the foregoing is a true and correct copy of a Resolution adopted by the ____________________________________________________________________ of the (governing body)
_________________________________________________________________________ (public agency)
on ________________________.
(date)
_______________________________________
Clerk/Secretary
_______________________________________
Title

City Council/Financing Authority Meeting K. 5.

DATE: 09/16/2025
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Public Works Contract with All American Building Services for the 2025 Alley Paving Improvement Project for an amount not-to-exceed $465,000.15 and determination that the Project is categorically exempt from environmental review pursuant to Section 15301(c) of the State's Guidelines for Implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Harris)
MOTION(S):

If the City Council determines the staff recommendation is appropriate, the following motions are provided:

I move that the City Council determine approval of the contract and construction of the 2025 Alley Paving Improvement Project is categorically exempt from environmental review in accordance with Section 15301(c) of the State's Guidelines implementing the California Environmental Quality Act; and

1. I move that the City Council approve the 2025 Alley Paving Improvement Project plans and specifications, and award a Public Works Contract to All American Building Services for an amount not-to-exceed $465,000.15.

2. RECOMMENDATION:

Staff recommends that the City Council determine approval of a Public Works Contract and construction of the 2025 Alley Paving Improvement Project is categorically exempt from environmental review pursuant to Section 15301(c) of the State's guidelines implementing the California Environmental Quality Act.

Staff further recommends City Council approve the 2025 Alley Paving Improvement Project plans and specifications, and award a Public Works Contract to All American Building Services for an amount not-to-exceed $465,000.15.

DISCUSSION:

The 2025 Alley Paving Improvement Project (Project) will resurface four (4) alleys identified on the attached location map (Attachment D). The Project also removes and replaces driveways and sidewalks where necessary, protects and/or replaces existing utilities, trees, power poles, public and private improvements, survey monuments, constructs drainage facilities, and restores all areas and improvements to pre-construction conditions.

City Staff recently prepared the plans and specifications and advertised the Project for construction. On July 17, 2025, the City Clerk's office received and opened the following eleven (11) bids for the Project:

BID OPENING REPORT SUMMARY
Bidder Bid Amount

1. All American Building Services, Santa Clarita, CA $465,000.15*

2. LCR Earthwork & Engineering Corp, Jurupa Valley, CA $570,478.00

3. Tryco General Engineering, Rimforest, CA $586,445.00

4. Onyx Paving Company Inc., Rancho Mission Viejo, CA $678,000.00

5. Mariani Builders, Inc., Rancho Mission Viejo, CA $689,614.00

6. Leonida Builders, Inc., Acton, CA $698,885.00

7. Tyner Paving Company, Alhambra, CA $762,469.00

8. Hardy & Hamer, Inc., Lake Forest, CA $808,185.00

9. We R Builders, Inc., Glendale, CA $818,490.50

10. J & A Engineering, Azusa, CA $983,541.00

11. All American Asphalt, Corona, CA $1,035,239.70
*An arithmetic error was made in the bid proposal. The total bid amount was corrected and highlighted in the attached Bid Analysis to identify arithmetic errors, but it did not affect ranking.

Bids were reviewed by staff, and All American Building Services was determined to be the lowest responsive and responsible bidder. Funding for the project is available in the FY 25/26 MUED budget. If approved, it is anticipated that the Project will be completed within forty-five (45) working days after issuance of the Notice to Proceed.

This project is categorically exempt from environmental review in accordance with Section 15301(c) of the State's guidelines implementing the California Environmental Quality Act, as the Project involves paving existing alleys within the right-of-way with no increase to existing use.

ALTERNATIVES:

City Council may deny the staff recommendation and provide alternate direction.

STRATEGIC PLAN:

The project supports Strategic Plan Priority D, Strategic Objective 3.

Infrastructure: Engineer and construct transportation facilities to accommodate all potential users - motorists, cyclists, and pedestrians.

SUBMITTED BY:

John R. Harris, Municipal Utilities and Engineering Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Goutam K. Dobey, City Engineer
PREPARED BY:

Johana Silva, Associate Engineer
Fiscal Impact
Fiscal Year: FY 25/26
Appropriation Required Y/N: No
Budgeted Y/N: Yes
Account No.: 211910
Discussion:

There is no fiscal impact associated with this action. The cost for this project is included in the FY 25/26 MUED budget.

Attachments
A. All American Building Public Works Contract
B. Bid Opening Report
C. Bid Analysis
D. Location Map
E. 2025 Alley Project Plans
F. 2025 Alley Specifications

1 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

PUBLIC WORK CONSTRUCTION CONTRACT

This Public Work Construction contract (“Contract”) is made and entered into this 16th day of September, 2025, by and between the City of Redlands , a municipal c orporation, organized and existing under the laws of the State of California (hereinafter “City”), and All American Building Services (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”

In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: 2025 Alley Paving Improvement Project , complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s 2025 Alley Paving Improvement Project, Project No. 211014 (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of Four Hundred Sixty-Five Thousand Dollars and Fifteen Cents ($465,000.15) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The W ork shall be completed within forty-five (45) working day(s) as defined in Section 1 -2 of the Standard Specifications for Public Works Construction “Greenbook” from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result i n damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each working day as defined in Section 1 -2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public

2 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

3 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)

By:____________________________________
Mario Saucedo, Mayor
ATTEST:

____________________________________
Jeanne Donaldson, City Clerk
(SEAL)

_All American Building Services _______________
Name of Contractor

By:_______________________________________
Signature of Authorized Agent

__________________________________________
Title

__________________________________________
Signature of Authorized Agent (if necessary)

__________________________________________
Title

__________________________________________
Contractor's License No.

4 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

WORKER'S COMPENSATION INSURANCE CERTIFICATION

Description of Contract: City of Redlands
Municipal Utilities and Engineering Department
2025 Alley Paving Improvement Project
Project No. 211014

Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:

a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to self - insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE

_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self -insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).

_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self -insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2025. ____All American Building Services________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)

(SEAL)

(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)

5 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

FAITHFUL PERFORMANCE BOND

Whereas, the City of Redlands (“City”), State of California, and All American Building Services (hereinafter designated as "Principal") have entered into an agreement dated September 16, 2025 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as 2025 Alley Paving Improvement Project, Project No. 211014 and is hereby referred to and made a part hereof; and

Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and , _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of Four Hundred Sixty-Five Thousand Dollars and Fifteen Cents ($465,000.15) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one -year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the

6 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2025.

(SEAL) (SEAL)

(Contractor) (Surety)
BY:
(Signature) (Signature)

Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________

7 I:\cmo\Agreements\All American Building Services 2025 Alley Paving Improvement Project FY2526-021.doc-wm

LABOR AND MATERIAL BOND

Whereas, the City Council of the City of Redlands, State of California, and All American Building Services (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated September 16, 20 25, and identified as 2025 Alley Paving Improvement Project, Project No. 211014 is hereby referred to and made a part hereof; and

Whereas, under the terms of the Agreement, Principal is required before commen cing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of four hundred sixty-five thousand dollars and 15 cents dollars ($465,000.15) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2025.

(SEAL) (SEAL)

(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )_________________

ATTACHMENT "C"
PROJECT NO. 211014 BID DATE: 17-Jul-2024
2025 Alley Paving Improvement Project EST. START DATE: 16-Sep-2024 Unit Price Item Price Unit Price Item Price Unit Price Item Price 1 Mobilization (Maximum 5% of total bid price) 1 LS $20 ,630.00 $20,630.00 $24,000.00 $24,000.00 $20,000.00 $20, 000.00 2 Erosion Control 1 LS $3,200.00 $3,200.00 $6,000.00 $6,000.00 $2,800.00 $2, 800.00 3 Survey (Construction Staking) 1 LS $5,600.00 $5,600.00 $15,000.00 $15,000.00 $5,000.00 $ 5,000.00 4 Removal of all trash and debris, shrubs, bushes, tree stumps, existing pavement, concrete, vgutter, pavement grindings from right of way
1 LS $22,520.00 $22,520.00 $160,000.00 $160,000.00 $20,00 0.00 $20,000.00 5 Construct 2.5" AC over 4" Aggregate Base, Compact Top 6" to 95% Compaction 36,907 SF $5.20 $191,916.40 $4.00 $147,628.00 $8.00 $295,2 56.00 6 Construct 2' Wide V-Gutter 2,527 LF $35.00 $88,445.00 $25.00 $63,175.00 $52.00 $131,4 04.00 7 Construct V-Gutter Transition 8 EA $250.00 $2,000.00 $750.00 $6,000.00 $540.00 $4,320.00 8 Remove and Replace Driveway, 6" Thick PCC (560-C-3250), Compact Top 6" to 95% Compaction 1,405 SF $32.75 $46,013.75 $25.00 $35,125.00 $29.00 $40,74 5.00 9 Remove and Replace Sidewalk, 6” Thick PCC (560-C-3 250) 570 SF $25.00 $14,250.00 $15.00 $8,550.00 $16.00 $9,12 0.00 10 Washington Street – Sawcut 12”x 50’ AC, Gravel Back fill & Redwood Headers 1 LS $10,425.00 $10,425.00 $5,000.00 $5,000.00 $4,800.00 $ 4,800.00 11 Demobilization 1 LS $10,000.00 $10,000.00 $50,000.00 $50,000.00 $3,000.0 0 $3,000.00 12 Unforeseen Work Not Covered Within All Other Bid Items 1 LS $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50 ,000.00 $50,000.00 Last Minute Additions/Deductions $0.00 $0.00 $0.00
Total Bid Price
License Status
Sub's License Status
Bid Bond Company
Submitted Entire Bid Package
Submitted Sub's Qualification Statement
DIR Status
Error in Bid Yes No No
*Arithmetic error and
incorrect amount entered for
unforeseen bid item
Yes Yes Yes
Active Active Active
Ohio Casualty Insurance Company Fidelity and Deposit Company American Contractors Indemnity Yes Yes Yes
Active Active Active
Active Active Active
$465,000.15 $570,478.00 $586,445.00

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Quantity Unit
All American Building
Services
LCR Earthwork &
Engineering, Corp
Tryco General
Engineering
Low Bidders #1, #2 and #3
Sheet 1 of 4
ATTACHMENT "C"
PROJECT NO. 211014 BID DATE: 17-Jul-2024
2025 Alley Paving Improvement Project EST. START DATE: 16-Sep-2024 Unit Price Item Price Unit Price Item Price Unit Price Item Price 1 Mobilization (Maximum 5% of total bid price) 1 LS $28 ,000.00 $28,000.00 $36,000.00 $36,000.00 $10,000.00 $10, 000.00 2 Erosion Control 1 LS $11,000.00 $11,000.00 $18,500.00 $18,500.00 $14,000. 00 $14,000.00 3 Survey (Construction Staking) 1 LS $24,000.00 $24,000.00 $30,000.00 $30,000.00 $8,000.0 0 $8,000.00 4 Removal of all trash and debris, shrubs, bushes, tree stumps, existing pavement, concrete, vgutter, pavement grindings from right of way
1 LS $210,000.00 $210,000.00 $75,000.00 $75,000.00 $53,00 0.00 $53,000.00 5 Construct 2.5" AC over 4" Aggregate Base, Compact Top 6" to 95% Compaction 36,907 SF $4.20 $155,009.40 $7.00 $258,349.00 $12.00 $442, 884.00 6 Construct 2' Wide V-Gutter 2,527 LF $42.00 $106,134.00 $50.00 $126,350.00 $28.00 $70, 756.00 7 Construct V-Gutter Transition 8 EA $1,625.00 $13,000.00 $1,000.00 $8,000.00 $1,000.00 $8 ,000.00 8 Remove and Replace Driveway, 6" Thick PCC (560-C-3250), Compact Top 6" to 95% Compaction 1,405 SF $28.00 $39,340.00 $35.00 $49,175.00 $13.00 $18,26 5.00 9 Remove and Replace Sidewalk, 6” Thick PCC (560-C-3 250) 570 SF $22.00 $12,540.00 $32.00 $18,240.00 $14.00 $7,9 80.00 10 Washington Street – Sawcut 12”x 50’ AC, Gravel Back fill & Redwood Headers 1 LS $6,976.60 $6,976.60 $5,000.00 $5,000.00 $6,000.00 $6, 000.00 11 Demobilization 1 LS $22,000.00 $22,000.00 $15,000.00 $15,000.00 $10,000. 00 $10,000.00 12 Unforeseen Work Not Covered Within All Other Bid Items 1 LS $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50 ,000.00 $50,000.00 Last Minute Additions/Deductions $0.00 $0.00 $0.00
Total Bid Price
License Status
Sub's License Status
Bid Bond Company
Submitted Entire Bid Package
Submitted Sub's Qualification Statement
DIR Status
Error in Bid No No No
Yes Yes Yes
Active Active Active
Swiss Re Corporate Solutions Merchants Bonding Company Developers Surety and Indemnity Yes Yes Yes
Active Active Active
Active Active Active

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Quantity Unit
Onyx Paving Company,
Inc. Marjani Builders, Inc. Leonida Builders, Inc.
$678,000.00 $689,614.00 $698,885.00
Low Bidders #4, #5 and #6
Sheet 2 of 4
ATTACHMENT "C"
PROJECT NO. 211014 BID DATE: 17-Jul-2024
2025 Alley Paving Improvement Project EST. START DATE: 16-Sep-2024 Unit Price Item Price Unit Price Item Price Unit Price Item Price 1 Mobilization (Maximum 5% of total bid price) 1 LS $15 ,000.00 $15,000.00 $12,720.00 $12,720.00 $38,000.00 $38, 000.00 2 Erosion Control 1 LS $5,000.00 $5,000.00 $7,419.10 $7,419.10 $5,000.00 $5, 000.00 3 Survey (Construction Staking) 1 LS $15,000.00 $15,000.00 $23,800.00 $23,800.00 $25,000. 00 $25,000.00 4 Removal of all trash and debris, shrubs, bushes, tree stumps, existing pavement, concrete, vgutter, pavement grindings from right of way
1 LS $160,000.00 $160,000.00 $261,240.00 $261,240.00 $135 ,000.00 $135,000.00 5 Construct 2.5" AC over 4" Aggregate Base, Compact Top 6" to 95% Compaction 36,907 SF $7.10 $262,039.70 $6.70 $247,276.90 $9.50 $350,6 16.50 6 Construct 2' Wide V-Gutter 2,527 LF $65.90 $166,529.30 $52.00 $131,404.00 $42.00 $106 ,134.00 7 Construct V-Gutter Transition 8 EA $700.00 $5,600.00 $3,250.00 $26,000.00 $4,200.00 $33, 600.00 8 Remove and Replace Driveway, 6" Thick PCC (560-C-3250), Compact Top 6" to 95% Compaction 1,405 SF $40.00 $56,200.00 $19.00 $26,695.00 $38.00 $53,39 0.00 9 Remove and Replace Sidewalk, 6” Thick PCC (560-C-3 250) 570 SF $30.00 $17,100.00 $20.00 $11,400.00 $25.00 $14, 250.00 10 Washington Street – Sawcut 12”x 50’ AC, Gravel Back fill & Redwood Headers 1 LS $5,000.00 $5,000.00 $4,930.00 $4,930.00 $5,000.00 $5, 000.00 11 Demobilization 1 LS $5,000.00 $5,000.00 $5,300.00 $5,300.00 $2,500.00 $2, 500.00 12 Unforeseen Work Not Covered Within All Other Bid Items 1 LS $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50 ,000.00 $50,000.00 Last Minute Additions/Deductions $0.00 $0.00 $0.00
Total Bid Price
License Status
Sub's License Status
Bid Bond Company
Submitted Entire Bid Package
Submitted Sub's Qualification Statement
DIR Status
Error in Bid No No No
Yes Yes Yes
Active Active Active
Old Republic Surety Company Fidelity and Deposit Company Merchants Bonding Company Yes Yes Yes
Active Active Active
Active Active Active

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Quantity Unit
Tyner Paving Company Hardy & Harper, Inc. We R Builders , Inc. $762,469.00 $808,185.00 $818,490.50
Low Bidders #7, #8 and #9
Sheet 3 of 4
ATTACHMENT "C"
PROJECT NO. 211014 BID DATE: 17-Jul-2024
2025 Alley Paving Improvement Project EST. START DATE: 16-Sep-2024 Unit Price Item Price Unit Price Item Price
1 Mobilization (Maximum 5% of total bid price) 1 LS $15 ,500.00 $15,500.00 $45,000.00 $45,000.00 2 Erosion Control 1 LS $5,000.00 $5,000.00 $4,600.00 $4,600.00 3 Survey (Construction Staking) 1 LS $14,500.00 $14,500.00 $25,000.00 $25,000.00 4 Removal of all trash and debris, shrubs, bushes, tree stumps, existing pavement, concrete, vgutter, pavement grindings from right of way
1 LS $120,300.00 $120,300.00 $365,000.00 $365,000.00
5 Construct 2.5" AC over 4" Aggregate Base, Compact Top 6" to 95% Compaction 36,907 SF $18.00 $664,326.00 $7.10 $262,039.70 6 Construct 2' Wide V-Gutter 2,527 LF $20.00 $50,540.00 $55.00 $138,985.00 7 Construct V-Gutter Transition 8 EA $500.00 $4,000.00 $1,000.00 $8,000.00 8 Remove and Replace Driveway, 6" Thick PCC (560-C-3250), Compact Top 6" to 95% Compaction 1,405 SF $25.00 $35,125.00 $55.00 $77,275.00 9 Remove and Replace Sidewalk, 6” Thick PCC (560-C-3 250) 570 SF $25.00 $14,250.00 $55.00 $31,350.00 10 Washington Street – Sawcut 12”x 50’ AC, Gravel Back fill & Redwood Headers 1 LS $5,000.00 $5,000.00 $15,000.00 $15,000.00 11 Demobilization 1 LS $5,000.00 $5,000.00 $13,000.00 $13,000.00 12 Unforeseen Work Not Covered Within All Other Bid Items 1 LS $50,000.00 $50,000.00 $50,000.00 $50,000.00 Last Minute Additions/Deductions $0.00 $0.00
Total Bid Price
License Status
Sub's License Status
Bid Bond Company
Submitted Entire Bid Package
Submitted Sub's Qualification Statement
DIR Status
Error in Bid No No
Yes Yes
Active Active
U.S. Specialty Insurance Fidelity and Deposit Company
No Yes
Active Active
Active Active

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Quantity Unit
J & A Engineering All American Asphalt
$983,541.00 $1,035,249.70
Low Bidders #10 and #11
Sheet 4 of 4
ALLEY CIP FY 25/26

MONA AVE

MAGNOLIA AVE

NORWOOD ST
EUR
EKA
ST

DOYLE AVE
SAN
PABLO
AVE

KENDALL ST

STILLMAN AVE

GRANT ST

COOK ST

DELAWARE AVE

CRESCENT AVE
FOUN
TA
INDR
NEW
YORK
ST
SALE
M
DR
CARVER
CIR

PARKWOOD
DR

FOUNTAIN
RD
1ST ST

CENTRAL AVE

MORRISON DR

PROVIDENCE
PL

ALDEN RD

DIVISION ST

MAYFLOWER

CULVERT
ST

LOMBARD DR

SONORA CIR

MILLS AVE

PUMMELO
DR

BROCKTON AVE

CARVERDR

LALANIA AVE
9TH ST

HOMEDEPOT

AUSTINWAY

MADISON
ST
DUKE
ST

MELBURYCT

LAPALOMA ST

UNNAMED

DE ANZA ST

FULBRIGHT AVE

KARON ST

HASTINGS ST

BROOKDALE DR

DALE LN
KATHI
ST
CAVEST
CHURCH
PL

BUENA VISTA ST

PURITAN
PL
TEXAS
ST
FURLOW
DR

ORANGEDALE AVE

LAURELAVE
MIA
CT

VILLAGE
ST

HARVARD
CT

SAN JUAN AVE
TULANE
CT

SAN MARCOS AVE
KE
LL
Y
ST

HEIDICT

LEMONLIME ST

STONY CT
SAN

MATEO S
T
10TH ST

FREMONT
ST

BANYAN DR

OCCIDENTAL DR

FALLBROOK
CT
6TH
ST

MARILYN AVE

CHARLINE
AVE

HOME PL

GOLD MEDAL L
N

CAMELLIA LN

EASTWOOD
ST

TANFORAN
WAY
GLEN

HAVEN WAY

FOUNTAIN WAY
ME
DALL
IO
N
ST

HALF MOON AVE
JADECT

CAROLYN CT
SUNNY
HEI
GHT
S
LN

RUIZ ST

FOUNTAIN CIR

LA VERNE
ST

DAHLIA AVE

CLARK ST

CARLSON
AVE

JAMES CT

EAST DR

ORCHARD CT

RACHEL CT

MATTHEWCT
ROSE

ARBOR CT

VERONA DR

CITRUS AVE

CORONADO DR
ELM
ST
LO
NG V
IEW
AVE

LANFAIR ST

GLENN CT

VERMONT
ST
MARD
I
GRAS
LN

MULVIHILL AVE

SANDALWOOD
AVE

DENISE AVE

SHARON RD
3RD ST
7TH ST

CARLOTTA CT

HIBISCUS DR

FOUNTAIN
VIEW

HARTZELL AVE

LEMONWOOD
AVE

ROBYN ST

HAMLIN PL
LUCY
ST
CRAIG
CT

COLGATE PL

EVERGREEN CT

TAMARISK ST
PHELAN
AVE
YUKO
N
ST

GROVE ST

GRANADA
CT

STATE ST

ARDMORE AVE
NELSON
ST
ROYAL
KNIGHT
TRL
KAYECT

ALDEN CT

ORCHARDDR

JOANNE ST
FALLB
ROOK
AVE

SAN RAFAEL
ST

LUCAS LN

LOTUSCT

STANDISH WAY
11TH ST

LUGONIA AVE
8TH ST

PHLOXCT

CIMARRON
DR

GREYSTONE AVE

BREWSTER WAY

ELISE DR

BERMUDA DR

CRYSTAL CT
IDYLLW
ILD
CT
5TH ST

SHERRY WAY

COURIER AVE

CHERYL ST

PENNSYLVANIA AVE

PINE AVE
FOUN
TAIN
PL
CAMB
ON
CT
BEGO
NIA
CT
SANDRA
WAY

SONATA DR

PEARL AVE

KIMBERLY AVE

PALM LANEDR

MARGIT ST

EMILY ST

WESTERN AVE

PARADISE WAY

SUN AVE

UNION AVE

DREKA AVE
PURDUE
AVE

BRADFORD
PL

WOODBURY ST
ARDMOR
E
CT

TIVOLI DR

CANTANIA AVE

ROSE ST
CENTER
PL

GLENWOO
DDR

ROSETTE
ST

TRIBUNE ST
YORK
ST

HANFORD
ST

FLETCHER AVE

LOTUSAVE

GAIL AVE

BIRCH CT

HIGH AVE

ROMA ST

STUART AVE
THOMAS
AVE

NICKOLAS
AVE

VINE ST

JULIE CTROSALIE
CT

CLIFTON CT

HOLLY LN

NORMANDIE CT

HERALD ST

ALTA ST

ORCHIDCT

GARDENIAAVE

WASHINGTON ST
BENBOW
PL

OHIO ST

WEBSTER ST

DEANNA WAY

COLUMBIA ST

CHAPEL ST

CALHOUN ST
SHAWN
CT

LAWTON ST

REES CT

TORINO ST

CARRIELN

LILAC CT

FOUNTAIN LN
JEREMY
CT
MC
AULI
FF
E
CT

BERKELEY DR

LIVE OAK
CT

JUNIPERCT
JASON
CT

NATHAN CT

BARBRA LN

QUINCY CTEDDY CTKIRBY CT
IRWIN
CT
CIMARR
ON
CT
HERON
CT

POST ST

SAHRON RD
HEM
LOC
K
CT

PRISCILLA

OXFORD DR
ROO
SEVE
LT
RD
DR
ACENA
CT
BOW C

PHLOX AVE

UNKNOWN

CERO CT

EVERRON CT

CALLE DESILVA

MELBURY PL

JURUPA AVE

PRIMROSEAVE

THE TERRACE

AL HARRIS LN

EDWARDS ST
GLOVER
ST

LIME ST

NAPA AVE

LEMON ST

HIDALGO AVE

MARTY ST

JENNIFER
ST

MYRTLE ST

NORDINA ST

SONORA ST

CLAY ST

HORIZON AVE

MICHIGAN ST

CAMPUS AVE

BOND ST

COLLEGE AVE
4TH ST

ALVARADO ST

THAMES ST

ESTHER WAY

HAMILTON CT
ASH ST
ARD
MO
RE CIR

SYLVAN BLVD
UN
IVERS
ITY
PL
SAN
JACIN
TO
ST

PALMBROOK
DR
CENTUR
Y
ST

NANETTE ST
West DR

LYTLE ST

STICKNEY CIR

LINDA PL

EMERALD AVE

RUBY AVE

HARRISON LN
CYPRES
S
CIR

NORTH PL

CLOCK AVE

CORNELL AVE

MORIARTY ST

KINGSWOOD DR

ARLENE ST

ASHLEY WAY

FRANCES ST

DEVON PL

SUSAN AVE

JEAN AVE

PARK AVE

HUNTER DR

TENNESSEE ST

LASSEN ST

FRONTIER AVEBALDWIN AVE

SANGORGONIO DR

OCCIDENTAL
CIR

ORIENTAL AVE
0 1,000 2,000 3,000 4,000500
US Feet
³
2025 ALLEY PAVING IMPROVEMENT PROJECT

LOCATION MAP
21010 CITY OF REDLANDS
F-2482 ST 5BENCHMARK
2025 ALLEY PAVING IMPROVEMENT PROJECTCITY OF REDLANDSCONSTRUCTION PLANS FOR JUNE 2025

VICINITY MAPNTS
PROJECT No. 211014
TITLE SHEET & VICINITY MAP1NORTH
PAUL T. BARICH, COUNCIL MEMBERMARC SHAW, MAYOR PRO TEMCHARLES M. DUGGAN JR., CITY MANAGERDENISE DAVIS, COUNCIL MEMBERMARIO SAUCEDO, MAYOREDDIE TEJEDA, COUNCIL MEMBERJEANNE DONALDSON, CITY CLERKCITY COUNCIL:CITY CLERK:CITY STAFF:

PROJECT NO. 2110142025 ALLEY PAVINGIMPROVEMENT PROJECT
SHEET INDEX:ALLEY 1
ALLEY 3ALLEY 2ALLEY 4

WASHINGTON ST

CITY OF REDLANDS
5F-2482 ST
PROJECT NO. 2110142025 ALLEY PAVINGIMPROVEMENT PROJECT
V-GUTTER TRANSITION DETAILN.T.S

35.0'

2.0'0.04' LIP0.00 FL% PER PLANBACK OFSIDEWALKMATCH BACKOF SIDEWALKEXISTINGSIDEWALKEXISTINGDRIVEWAY V-GUTTER CROSS SECTION SHALL BE TAPEREDFLAT OVER A 5' DISTANCE, PRIOR TO MATCHINGBACK OF SIDEWALK, TO REMOVE 12" LIP 4 1'1' R/W2.0%2.0%COMPACT TOP 6" OFSUBGRADE TO 95%COMPACTION.

CL32ADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLAN4:1 MAX4:1 MAX4:1 MAX4:1 MAXADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLANNOTE:CONTRACTOR TO FIELD VERIFYALL EXISTING UTILITIES.EXISTING GASEXISTING SEWER NOTE:1.REMOVE ALL: TRASH & DEBRIS, SHRUBS,BUSHES, TREE STUMPS,PAVEMENT GRINDINGS,OLD V-GUTTERS AND OLD PAVEMENT (PCC/AC)FROM RIGHT-OF-WAY2.CONTRACTOR TO PAVE UP TO DRIVEWAY/VEHICLE ACCESS OR FENCE LINE EVENTHOUGH OUTSIDE OF RIGHT OF WAY, WHERELESS THAN 2 FEET. 1'1'
V-GUTTER DETAILN.T.SCONSTRUCT 8" THICK, 2'-WIDECONCRETE GUTTER. CONCRETESHALL BE 560-C-3250.CONTRACTION JOINTS EVERY 20'.12" LIP12" R(TYP.)6" WIDE STEELTROWEL FINISHCL8"4" OF CRUSHED AGGREGATE BASE(CAB), CRUSHED MISCELLANEOUSBASE, FINE MIX (CMB) OR CLASS 2 BASE(3/4” MAX.) @ 95% COMPACTION.3 ”
GENERAL NOTES:

ALLEY TYPICAL SECTIONN.T.S

NOTES AND DETAILS
ACCURACY DISCLAIMER:ENGINEER'S NOTICE TO CONTRACTOR:
2 123456
4561 1 1 1 1 120+00.001367.05 FL1+00.001368.54 FL2+00.001370.37 FL3+00.001372.08 FL4+00.001373.67 FL5+00.001375.236+00.001376.81 FL3 4561 1 127+00.001378.31 FL8+00.001379.71 FL9+00.001381.02 FL9+50.371381.68 FL

CITY OF REDLANDS
5F-2482 ST
PROJECT NO. 2110142025 ALLEY PAVINGIMPROVEMENT PROJECT
ALLEY 112345 3
1'1' R/W2.0%2.0%COMPACT TOP 6" OFSUBGRADE TO 95%COMPACTION.

CL32ADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLAN4:1 MAX4:1 MAX4:1 MAX4:1 MAXADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLANNOTE:CONTRACTOR TO FIELD VERIFYALL EXISTING UTILITIES.EXISTING GASEXISTING SEWER NOTE:1.REMOVE ALL: TRASH & DEBRIS, SHRUBS,BUSHES, TREE STUMPS,PAVEMENT GRINDINGS,OLD V-GUTTERS AND OLD PAVEMENT (PCC/AC)FROM RIGHT-OF-WAY2.CONTRACTOR TO PAVE UP TO DRIVEWAY/VEHICLE ACCESS OR FENCE LINE EVENTHOUGH OUTSIDE OF RIGHT OF WAY, WHERELESS THAN 2 FEET.

ALLEY TYPICAL SECTIONN.T.S
MATCHLINE SEE BELOW LEFTALLEY 11"=20'
NORTH

SAN BERNARDINO AVENUEALTA STREET
SAN BERNARDINO AVENUEGLOVER STREETMATCHLINE SEE ABOVE RIGHTALLEY 11"=20' 0+00.001394.90 FL1+00.001396.05 FL2+00.001397.74 FL3+00.001399.54 FL4+00.001401.12 FL5+00.001402.82 FL5+73.461401.17 FL24 45 211 11 1 111 11 113 0+00.001348.04 FL
1+00.001349.62 FL
2+00.001650.72 FL
3+00.001351.96 FL
4+00.001352.82 FL4+14.531353.10 FL54245 11111 1 113

CITY OF REDLANDS
5F-2482 ST
PROJECT NO. 2110142025 ALLEY PAVINGIMPROVEMENT PROJECT
ALLEY 2 & 34
1'1' R/W2.0%2.0%COMPACT TOP 6" OFSUBGRADE TO 95%COMPACTION.

CL32ADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLAN4:1 MAX4:1 MAX4:1 MAX4:1 MAXADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLANNOTE:CONTRACTOR TO FIELD VERIFYALL EXISTING UTILITIES.EXISTING GASEXISTING SEWER NOTE:1.REMOVE ALL: TRASH & DEBRIS, SHRUBS,BUSHES, TREE STUMPS,PAVEMENT GRINDINGS,OLD V-GUTTERS AND OLD PAVEMENT (PCC/AC)FROM RIGHT-OF-WAY2.CONTRACTOR TO PAVE UP TO DRIVEWAY/VEHICLE ACCESS OR FENCE LINE EVENTHOUGH OUTSIDE OF RIGHT OF WAY, WHERELESS THAN 2 FEET.

ALLEY TYPICAL SECTIONN.T.S
12345
REDLANDS BOULEVARDCHURCH STREETCITRUS AVENUENORTHALLEY 31"=20' EUREKA STREET4TH STREETVINE STREETNORTHALLEY 21"=20'

CITRUS AVENUE
0+00.001375.20 FL
1+00.001378.87 FL
2+00.001382.70 FL
3+00.001386.02 FL
4+00.001389.19 FL5+00.001392.40 FL
5+86.381395.7422 64111411 1111521 3
1 CITY OF REDLANDS
5F-2482 ST
PROJECT NO. 2110142025 ALLEY PAVINGIMPROVEMENT PROJECT
ALLEY 4 & WASHINGTON STREET5
1'1' R/W2.0%2.0%COMPACT TOP 6" OFSUBGRADE TO 95%COMPACTION.

CL32ADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLAN4:1 MAX4:1 MAX4:1 MAX4:1 MAXADJACENT AREA SHALL BEGRADED FLUSH WITH PER PLANNOTE:CONTRACTOR TO FIELD VERIFYALL EXISTING UTILITIES.EXISTING GASEXISTING SEWER NOTE:1.REMOVE ALL: TRASH & DEBRIS, SHRUBS,BUSHES, TREE STUMPS,PAVEMENT GRINDINGS,OLD V-GUTTERS AND OLD PAVEMENT (PCC/AC)FROM RIGHT-OF-WAY2.CONTRACTOR TO PAVE UP TO DRIVEWAY/VEHICLE ACCESS OR FENCE LINE EVENTHOUGH OUTSIDE OF RIGHT OF WAY, WHERELESS THAN 2 FEET.

ALLEY TYPICAL SECTIONN.T.S
12345
CLARK STREETFERN AVENUENORMANDIE COURTNORTHALLEY 41"=20'

MICHIGAN STREET
CLAY STREETDREKA AVENUENORTHWASHINGTON STREET1"=20'WASHINGTON STREET

CITY OF REDLANDS

MUNICIPAL UTILITIES &

ENGINEERING DEPARTMENT
B
id Proposal, Contract Documents and Specifications
Fo
r
2 025 ALLEY PAVING IMPROVEMENT PROJECT
PROJECT NO. 211014
JU
NE 2025

CITY OF REDLANDS
MU

NICIPAL UTILITIES & ENGINEERING DEPARTMENT
B
id Proposal, Contract Documents and Specifications
fo
r
2025 ALLEY PAVING IMPROVEMENT PROJECT
PROJECT NO. 211014
F
or use in conjunction with specifications entitled: “Standard Specifications for Public Works Construction (Greenbook)” 2021 Edition; “Standard Plans for Public Works Construction” 2021 Edition; Municipal Utilities and Engineering Department’s Water Systems Standard Specifications and Sanitary Sewer System Standard Specifications, latest editions; and General Permit Conditions and Trench Specifications.

C
ity Council:

Mario Saucedo, Mayor
Marc Shaw, Mayor Pro Tem
Paul T. Barich, Councilmember
Eddie Tejeda, Councilmember
Denise Davis, Councilmember
Ci
ty Clerk:

Jeanne Donaldson, City Clerk
C
ity Staff:

Charles M. Duggan Jr., City Manager
JU
NE 2025

THIS PAGE INTENTIONALLY LEFT BLANK

TOC 1
2025 ALLEY PA VING IMPROVEMENT

PROJECT
PROJECT NO. 211014

TABLE OF CONTENTS
(XX) REFLECTS PAGE IDENTIFICATION FOOTER ABBREVIATION

NOTICE INVITING SEALED PROPOSALS (NIB)

BID DOCUMENTS (BD)
INSTRUCTIONS TO BIDDERS .......................................................................................... 1 PROPOSAL ...................................................................................................................... 10 BID CERTIFICATION ........................................................................................................ 13 BID BOND ...................................................................................................................... 14 NON-COLLUSION AFFIDAVIT ...................................................................................... 15 STATEMENT BY BIDDER ............................................................................................... 16 OFFICERS OF CORPORATION (Members of Firm) ....................................................... 16 SUB-CONTRACTORS LIST ............................................................................................. 17 QUALIFICATION AND EXPERIENCE STATEMENT .................................................. 18 GENERAL INFORMATION ............................................................................................. 19

CONTRACT DOCUMENTS (CD)
PUBLIC WORKS CONSTRUCTION CONTRACT ........................................................... 1

GENERAL CONDITIONS (GC)
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS ...................................................................... 1 SECTION 2 - SCOPE OF THE WORK ............................................................................... 2 SECTION 3 - CONTROL OF THE WORK ......................................................................... 3 SECTION 4 - CONTROL OF MATERIALS ....................................................................... 7 SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES ...................................... 8 SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK .............................. 30 SECTION 7 - MEASUREMENT AND PAYMENT ......................................................... 32 SECTION 8 - FACILITIES FOR AGENCY PERSONNEL .............................................. 33 SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES CLAIMS ........... 33 SECTION 10 - TRENCHING AND EXCAVATION ........................................................ 33 SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF EXISTING UTILITIES ................................................................................................... 34 SECTION 200 - ROCK MATERIALS ............................................................................... 35 SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS ..................... 36 TOC 2
SECTION 203 - BITUMINOUS MATERIALS ................................................................. 36 SECTION 206 - MISCELLANEOUS METAL ITEMS ..................................................... 37 SECTION 207 – GRAVITY PIPE ...................................................................................... 38 SECTION 211 - MATERIAL TESTS ................................................................................ 38 SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 38 SECTION 300 - EARTHWORK ........................................................................................ 39 SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND PLACEMENT OF BASE MATERIALS ............................................................................. 43 SECTION 302 - ROADWAY SURFACING ..................................................................... 48 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION .............................. 58 SECTION 304 - METAL FABRICATION AND CONSTRUCTION .............................. 61 SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 62 G

ENERAL REQUIREMENTS
SECTION 01110 COORDINATION OF WORK
SECTION 01112 DESCRIPTION OF WORK
SECTION 01200 MEASUREMENT AND PAYMENT
SECTION 01251 CHANGE ORDER REQUESTS
SECTION 01254 CHANGE ORDERS
SECTION 01298 SCHEDULE OF VALUES
SECTION 01321 CONSTRUCTION SCHEDULE
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY
SECTION 01323 CONSTRUCTION STATUS REPORTS
SECTION 01330 SUBMITTALS
SECTION 01571 STORMWATER POLLUTION PREVENTION PLAN
SECTION 01581 CONSTRUCTION INFORMATION SIGNS
SECTION 01721 MOBILIZATION
SECTION 01722 SURVEYING
SECTION 01732 POTHOLING
SECTION 01740 DEMOBILIZATION
T

ECHNICAL SPECIFICATIONS
SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES TOC 3

APPENDIX

APPENDIX A CHECKLIST OF LABOR LAW REQUIREMENTS

APPENDIX B CITY OF REDLANDS WORKDAY CONSTRUCTION SCHEDULE

APPENDIX C CITY OF REDLANDS STANDARD DRAWINGS

APPENDIX D PERMITS

APPENDIX E CITY OF REDLANDS TRASH COLLECTION SCHEDULE

APPENDIX F CITY OF REDLANDS CONTRACTOR SAFETY PROGRAM

THIS PAGE INTENTIONALLY LEFT BLANK

BID DOCUMENTS
(BD)

THIS PAGE INTENTIONALLY LEFT BLANK

BD 1

INSTRUCTIONS TO BIDDERS
For
2025 ALLEY PAVING IMPROVEMENT PROJECT
PROJECT NO. 211014

Bids to receive consideration shall be made in accordance with the following instructions:

1. PROPOSALS:

a
. Bids shall be made upon the form of proposal furnished by the City. All Bids shall be properly executed with all items filled in; the signatures of all persons signing shall be in longhand. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price shall be considered as representing the Bidder's intention, and the totals may be corrected by the Engineer to conform thereto. If the sum of the individual bid item’s and the total amount named by a Bidder are not in agreement, the sum of the bid item’s shall be considered as representing the Bidder’s intention, and the totals may be corrected by the Engineer to conform thereto. If the total price written in words and the total price written in figures are not in agreement, then the total price written in words will be considered as representing the Bidder’s intention, and the totals will be corrected by the Engineer to conform thereto.

b. Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete Bids, erasures, or irregularities of any kind.

Mistakes shall be lined through and the correct amount written above a nd initialed by the authorized agent of the Bidder.

c. Bids shall be accompanied by a cashier's or a certified check or Bidder's admitted corporate surety bond, in an amount not less tha n ten percent (10%) of the bid, made payable to the City of Redlands. Said check or bond shall be given as a guarantee that the Bidder will enter into a contract if awarded the work. In the case of refusal or failure to enter into said Contract, within fourteen (14) days after Notice of Award by the City in writing, the security shall be applied by the City to the difference between such bid and next lowest acceptable bid and surplus, if any, shall be returned to Bidder if cash or check is used, or to Surety if bid bond is used.

d. Before submitting a bid, Bidders shall carefully examine the Plans; read the Specifications; read all other Contract documents; shall visit the site of the work; shall fully inform themselves as to all existing conditions and limitations; and include in the bid a sum to cover the cost of all items included in the Contract. No allowance will be made due to lack of examination or knowledge. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered as to character, quality and scope of work to be performed; the quantities of materials to be furnished; and as to the requirements of the Bid Proposal, plans and specifications.

BD 2
e. Pursuant to CA Labor Code Section 1770 et seq., the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available at http://www.dir.ca.gov/OPRL/PWD/. Copies of the prevailing wage determination are also on file at the City of Redlands and shall be made available to any interested party upon request.

f. The bid must be submitted on or before the date and time specified in the Notice Inviting Sealed Proposals (Bids). The bid shall be submitted in a sealed envelope marked in the lower left corner as follows:

BID FOR: 2025 ALLEY PAVING IMPROVEMENT PROJECT,
PROJECT NO. 211014

g. Bids will be opened and publicly read aloud at the time set in the Notice Inviting Sealed Proposals (Bids), in the Office of the City Clerk, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.

2. AGREEMENT AND BONDS:

The form of Contract which the successful Bidder, as Contractor, will be required to execute is included in the Contract Documents (CD) of these specifications and should be carefully examined by the Bidder. The Agreement, admitted Corporate Surety Bonds and other documents to be executed by the Contractor shall be executed in original-duplicates stamped according to law, one of which original -duplicates shall be filed with the City Clerk of the City of Redlands. The successful Bidder, simultaneously wit h the execution of the Agreement, will be required to furnish a faithful performance bond and a labor and material bond, each in an amount equal to one hundred percent (100%) of the Contract price. Said bonds shall provide that if the Contractor or their Subcontractor fails to pay for any materials, provision, provender or other supplies or items used in, upon, for or about the performance of the work contracted to be done, or for any work of labor thereon of any kind, or for amounts due under the Unemployment Insurance Act or Workman's Compensation, with respect to such work or labor, that the surety or sureties will pay for the same. The amount shall not exceed the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. All bonds shall be secured from surety companies satisfactory to the City of Redlands and whose name is on file with the County Clerk of San Bernardino County, as an approved and financially sound surety company authorized to transact business in this state.

3. WITHDRAWAL OF BIDS:

a. Any Bidder may withdraw his Bid, only by written request, at any time prior to the scheduled time for Bid Opening.

b. No Bidder may withdraw his Bid for a period of sixty (60) days after the time of Bid Opening except as allowed by the California Public Contract Code.

BD 3

4. INSURANCE AND HOLD HARMLESS REQUIREMENTS:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract. Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self -insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Insurance Requirements as follows:

CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits
and Conduit Construction
(streets)
Grading of Land Street Cleaning
Caisson or Cofferdam Work Hazardous Materials
Contractors Street or Road Construction
Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street
or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting,
Spraying or Removal

BD 4
TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
 $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
 If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

b. Business Auto Liability
 $1 Million Combined Single Limit
 City listed as an Additional Insured on the coverage
 Must include liability arising from all owned, leased, hired, and non-owned autos  If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission  If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements.

c. Commercial Umbrella/ Excess Liability
 $5 Million Per Occurrence/ Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

d. Workers Compensation
 $1 Million Per Occurrence for Bodily Injury by Accident  $1 Million Each Employee for Bodily Injury by Disease  $1 Million Policy Limit for Bodily Injury by Accident  Waiver of Subrogation in favor of City
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

e. Pollution Policy (Hazardous Materials) [If Applicable]  Required of Projects that involve Demolition and/or Excavation Activities  $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage

BD 5

TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
 $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
 If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

b. Business Auto Liability
 $1 Million Combined Single Limit
 City listed as an Additional Insured on the coverage
 Must include liability arising from all owned, leased, hired, and non-owned autos  If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission  If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements.

c. Workers Compensation
 $1 Million Per Occurrence for Bodily Injury by Accident  $1 Million Each Employee for Bodily Injury by Disease  $1 Million Policy Limit for Bodily Injury by Accident  Waiver of Subrogation in favor of City
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

d. Pollution Policy (Hazardous Materials) [If Applicable]  Required of Projects that involve Demolition and/or Excavation Activities  $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage

CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC)
Systems (service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair)
Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors

BD 6

Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given. The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.

5. LICENSES AND PERMITS:

No bid will be accepted from a Contractor who is not licensed in accordance with the law under the provisions of Division III, Chapter 9 of the Business and Professions Code of the State of California.

The Contractor shall, at the time of bid opening, possess a valid "Class A" or "Class C -34" Contractor's license, and provide its California State Contractor’s License number to the City.

All subcontractors listed at the time of bid opening shall possess a valid Contractor’s license for the work in which they are specified to complete within the Bid Submittal Package.

BD 7
The Contractor shall, prior to Notice to Proceed, procure all other permits and licenses as stipulated in the GENERAL CONDITIONS.

In addition, no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015 or awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Contractors shall submit proof of registration status with their bid submission to the City of Redlands. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

6. SUBSTITUTION OF SECURITIES:

In accordance with applicable provisions of State law, the Contractor will be permitted to substitute qualified securities in lieu of retention of withheld progress payments by the Owner.

7. SUBCONTRACTORS:

Pursuant to Section 4105 of the C alifornia Public Contract Code, t he bidder may not circumvent the requirement to list subcontractors by the device of listing one subcontractor, who in turn sublets portions constituting a majority of the work covered by the contract.

A. Pursuant to California Government Code section 4106, subcontractors who will perform work or labor or render services in an amount in excess of one-half of one percent of the Contractor’s total bid shall be set forth in a list of subcontractors within the bid documents. Such list shall be accompanied by an experienced statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual, or entity if requested by City. If City or engineer, after doing an investigation, has reasonable objection to any proposed subcontractor, supplier, individual, or entity, City may, before the notice of award is given, request the apparent successful bidder to submit a substitute, without an increase in the bid.

B. If the apparent successful bidder declines to make any such substitution, City may award the contract to the next lowest bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities declining to make the request and substitutions will not constitute grounds for forfeiture of the bid security of any bidder. Any subcontractor, supplier, individual or entity so listed and against which City makes no written objection prior to the giving of the notice of award will be deemed ac ceptable by City subject to verification of such assessments after the effective date of the agreement as provided herein.

8. NON DEBARRED CONTRACTORS AND SUBCONTRACTORS

The Contractor and all of its subcontractors shall, at the time of bid opening and for performance of this public works contract, be non-debarred contractors and not be ineligible Contractors pursuant to Public Contract Code section 6109 and Labor Code sections 1777.1 and 1777.7.

BD 8

9. LABOR LAW REQUIREMENTS

Prior to the start of construction, the Contractor and each subcontractor shall submit to the City an executed Checklist of Labor Law Requirements, included within Appendix A, certifying that each Contractor and Subcontractor will comply with the foregoing Labor Law requirements; and fully understands that failure to comply with these requirements will subject it to the penalties cited herein.

By submitting a bid, the prime contractor and subcontractors involved in this project assure that they intend to comply with the labor law requirements noted within Appendix A, fully understanding that failure to comply may subject them to penalties as noted.

10. BID PROTEST PROCEDURES

Any bid protest must be in writing and received by the City Clerk’s Office at 35 Cajon Street, Suite 4, Redlands, CA 92373, before 5:00 p.m. no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:

10.1 General . Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by City, the protesting bidder must submit a non- refundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section, a “working day” means a day that City is open for normal business, and excludes weekends and holidays as observed by the City.

10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.

10.3 Copy to Protested Bidder. A copy of the protest and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending on the outcome of the protest.

10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk’s Office before 5:00 p.m., within two working days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and t elephone number of the person representing the protested bidder if different from the protested bidder.

BD 9

10.5 Copy of Protesting Bidder. A copy of the response and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

10.6 Exclusive Remedy. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

10.7 Right to Award. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the Contract notwithstanding any pending or continuing challenge to its determination.

BD 10

PROPOSAL

TO: THE CITY OF REDLANDS, SAN BERNARDINO COUNTY, CALIFORNIA herein called the “City”.

Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract, and complete in a workmanlike manner, all of the work covered by the contract in connection with the City’s Project identified as

2025 ALLEY PAVING IMPROVEMENT PROJECT
PROJECT NO. 211014

NOTE: Bidders must bid each item in this schedule. All entries in the entire PROPOSAL must be made clearly and in ink. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.

BID SCHEDULE
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated
Quantity
Unit Price
(If Applicable) Total Price in Figures
1 Mobilization (Maximum 5%
of Total Base Bid Price)
LUMP
SUM N/A $______________________
2 Erosion Control

LUMP
SUM N/A $______________________
3 Survey (Construction Stake) LUMP
SUM N/A $______________________
4 Removal of all trash and debris,
shrubs, bushes, tree stumps,
existing pavement, concrete, v-
gutter, pavement grindings from
right of way
LUMP
SUM N/A $______________________
5 Construct 2.5” AC Over 4”
Aggregate Base, Compact Top
6” to 95% Compaction
36,907
SF $_________/SF $______________________
6 Construct 2’ Wide V-Gutter 2,527 LF $_________/LF $______________________ 7 Construct V-Gutter Transition 8 EA $_________/EA $______________________

BD 11

BID SCHEDULE (CONTINUED)
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated
Quantity
Unit Price
(If Applicable) Total Price in Figures
8 Remove and Replace Driveway,
6” Thick PCC (560-C-3250),
Compact Top 6” to 95%
Compaction
1,405 SF $_________/SF $______________________
9 Remove and Replace Sidewalk,
6” Thick PCC (560-C-3250) 570 SF $_________/ SF $______________________ 10 Washington Street – Sawcut
12”x 50’ AC, Gravel Backfill &
Redwood Headers
LUMP
SUM N/A $______________________
11 Demobilization LUMP
SUM N/A $______________________
12 Unforeseen Work Not Covered
Within All Other Bid Items
LUMP
SUM
N/A $________ ______________
BID SCHEDULE PRICE $______________________
Las
t Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ BI
D SCHEDULE TOTAL PRICE: $_______________________________________________________ BID SCHEDULE TOTAL PRICE WRITTEN IN WORDS: ________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ * Pr
ovision is made here for the Bidder to include an addition or deduction in its bid, if it wishes, to reflect any last-minute adjustments in prices. The addition or deduction, if made, will be proportionately applied to the Progress Payments total for the respective item in the Schedule of Prices, the amount being added or deducted for each monthly payment. The unit prices entered in the Schedule of Prices will not be affected.

L
OW BID DETERMINATION:

The low bid will be determined pursuant to Public Contract Code Section 20103.8 as the lowest bid price on the Bid Schedule Total Price on page BD 11. A responsible bidder who submits the lowest bid as determined by the above method shall be awarded the contract, if it is awarded, by the City Council of the City of Redlands.
50,000.00

BD 12

ADDENDA

Receipt of the following addenda is hereby acknowledged and the same is included in the Bid Price:

Addendum #1___________ Addendum #2___________ Addendum #3____________ (initials) (initials) (initials)

Addendum #4___________ Addendum #5___________ Addendum #6____________

(initials) (initials) (initials)

ATTEST: (if Corporation)

(Corporation Seal)

___________________________________ _____________________________________ Company Name Signature

____________________________________ _____________________________________ Address Name

____________________________________ _____________________________________ City, State, Zip Title

BD 13

BID CERTIFICATION

The undersigned certifies that they are familiar with the various State and local laws affecting labor, length of working days, employer's liabilities, Sunday work, alien labor, domestic materials, Subcontractors, etc.

It is understood and agreed that the work under the contract will be commenced by the undersigned Bidder, if awarded the contract, within ten (10) calendar days from the date in the Notice to Proceed and will be completed by the Contractor in the time set forth in the CONTRACT.

Enclosed find Bidders bond or certified or cashier's check No. _________________ on the __________________________________ Bank, in the amount of ______________________ _______________________ which is not less than ten percent (10%) of the Bid submitted by the undersigned, made payable to the City of Redlands, California and which is given as a guarantee that the Bidder agrees that in case of their default in executing said contract with necessary bonds, the bond or check accompanying this Bid and the mone y made payable shall become and remain the property of the City of Redlands.

It is understood and agreed that the City of Redlands has the right to waive defects or irregularities and to accept or reject any or all Bids. No Bidder may withdraw their Bid for a period of sixty (60) days after the time of the Bid Opening except as allowed by the California Public Contract Code.

The following information, required by State law under penalty of perjury, is true and correct. Failure to complete this information renders the bid non-responsive, and the bid must be rejected.

____________________________________ _______________________________________ Company Name Signature

____________________________________ _______________________________________ Address Signatory's Title

____________________________________ _______________________________________ City, State, Zip State License Number and Class

____________________________________ _______________________________________ Telephone Number License Expiration Date

Dated this ________________ day of ___________________, 20___.

BD 14

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,

That ______________________________________________________________ as Principal, and ______________________________________ as Surety, are held and firmly bound unto the City of Redlands, hereinafter called City, in the sum of ______________________________________ dollars, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to said City to perform all work required under the PROJECT NO. 211014.

NOW, THEREFORE, if said Principal is awarded a contract by said City and, within the time and in the manner required under the heading "Instructions to Bidders" bound with said Specifications, enters into a written contract on the form of agreement bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials; then this obligations shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said City and Judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney's fee to be fixed by the court.

SIGNED AND SEALED, this _________ day of _____________________________, 20____.

______________________________(SEAL) _______________________________(SEAL) (Principal) (Surety)

By:_________________________________ By:__________________________________ (Signature) (Signature)

Address:______________________________
_____________________________________
Telephone (___)________________________
(Seal and Notarial Acknowledgment of Surety)
BD 15

STATEMENT BY BIDDER

NON-COLLUSION AFFIDAVIT
S

TATE OF )
) ss

COUNTY OF )
, being first duly sworn, deposes and says that
he is
( Sole Owner, a Partner, President, Secretary, etc.)
o
f
(Contractor)
t
he party making the foregoing bid on PROJECT NO. 211014 that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or of any other Bidder or to fix any overhead, profit, or cost element of the bid price or of that of another bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that the Bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

B
y: ______________________________ Title: ________________________________ S
ubscribed and sworn to before me this day of __________________________, 20 .

Signature of Officer Administering Oath
(Notary Public)

BD 16

STATEMENT BY BIDDER
OFFICERS OF CORPORATION (Members of Firm)

The names of all persons interested in the foregoing proposals as principals, are as follows:
(IMPORTANT NOTICE - if Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if a co-partnership, state true name of firm, also names of all individual co-partners composing firm; if Bidder or other interested person is an individual, state first and last names in full).

_____________________________________ _____________________________________

_____________________________________ _____________________________________

_____________________________________ _____________________________________

Licensed in accordance with an act providing for the Registration of Contractors, License

No. ______________________________________.

Signature of Bidder Dated

NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer(s) authorized to sign contracts on behalf of the corporation; if Bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership, and if the Bidder is an individual, that signature shall be placed above.

BD 17

STATEMENT BY BIDDER

SUB-CONTRACTORS LIST

Bidder supplies the following information for any Subcontractor who will perform work or labor or render services to the prime contractor, etc. to be used on PROJECT NO. 211014, all in accordance with Section 4104 of the California Public Contract Code.

LICENSED SUBCONTRACTOR’S NAME

AND BUSINESS ADDRESS

LICENSE #

SPECIFIC

DESCRIPTION

OF SUBCONTRACT
& BID ITEM #
% OF BID

ITEM TO BE

PERFORMED

BD 18

STATEMENT BY BIDDER

QUALIFICATION AND EXPERIENCE STATEMENT

The following outline is a record of the undersigned Bidder's experience in construction of three (3) projects of a type similar in magnitude and character to that contemplated under PROJECT NO. 211014 within the past two years. Include the location of each project as well as the name, address, and phone number of the owner, and name of individual to contact.

Subcontractors performing in excess of one half of one percent of the prime Contractor’s total bid, or in the construction of streets or highways, one half of one percent of the prime contractor’s total bid or ten thousand dollars ($10,000), which ever is greater shall provide a similar outline.

Additional pages outlining this portion of the Bid may be attached. Failure to provide this statement may result in rejection of the bid by the City of Redlands.

1. Owner's Name:

Contact Person: Phone: ( ) Address of Owner:

Project Description:

Amount of Contract: Completion Date:

2. Owner's Name:

Contact Person: Phone: ( ) Address of Owner:

Project Description:

Amount of Contract: Completion Date:

3. Owner's Name:

Contact Person: Phone: ( ) Address of Owner:

Project Description:

Amount of Contract: Completion Date:

BD 19

STATEMENT BY BIDDER

GENERAL INFORMATION

1. B
idder's Mailing Address

2. N
umber of years engaged in the contracting business under your present firm or trade name:

3. H
ave you ever failed to complete any work awarded to you? (Yes or No) . If yes, provide details in the space provided in Item 10.

4. H
ave you ever defaulted on a contract? (Yes or No) . If yes, provide details in the space provided in Item 10.

5. H
ave you ever been a party to a lawsuit or gone to arbitration during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

6. H
as any Stop Notice been filed against you during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

7. H
as your contractor's license ever been suspended, revoked, or subject to disciplinary action? (Yes or No) . If yes, provide details in the space provided in Item 10.

8. C
ontracts currently on hand:

Agency Name Amount of Contract Start Date Completion Date

9. E
nter the name of person(s) who inspected the site of the proposed work for your firm and the date of said site inspection.

Name: Date:

BD 20

10. In the space provided, the Bidder shall provide details concerning any "Yes" answers provided in this "General Information" section. Details shall include, but not be limited to, the nature of dispute, name of the agency involved and the final outcome. I f requested by the City, the Bidder shall supply additional information, sufficiently detailed, to permit evaluation of the Bidder's ability to perform the work.

Question
Number Details

CONTRACT DOCUMENTS
(CD)

T

HIS PAGE INTENTIONALLY LEFT BLANK

PUBLIC WORKS CONSTRUCTION CONTRACT

This Public Work Construction contract (“Contract”) is made and entered into this ___ day of ____________, 2025, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and __________________ (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”

In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: 2025 Alley Paving Improvement Project, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s 2025 Alley Paving Improvement Project, Project No. 211014 (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of ___________________ dollars ($___________) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within forty-five (45) working day(s) as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each working day as defined in Section 1- 2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

CD
2 7. RE
SOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. E
LIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. AS
SIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. S
UCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. S
EVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

CD 3
IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)

By:____________________________________
Mario Saucedo, Mayor
ATTEST:

____________________________________
Jeanne Donaldson, City Clerk
(SEAL)

__________________________________________
Name of Contractor

By:_______________________________________
Signature of Authorized Agent

__________________________________________
Title

__________________________________________
Signature of Authorized Agent (if necessary)

__________________________________________
Title

__________________________________________
Contractor's License No.

CD
4 WORKER'S COMPENSATION INSURANCE CERTIFICATION
D
escription of Contract: City of Redlands
Municipal Utilities and Engineering Department
2025 Alley Paving Improvement Project
Project No. 211014
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self -insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I
am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I
affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self -insure, or a certification of workers’ compensation insurance.

I
certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2025.
___ __________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(
SEAL)
(
Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.) CD
5 FAITHFUL PERFORMANCE BOND
W
hereas, the City of Redlands (“City”), State of California, and ______________ (hereinafter designated as "Principal") have entered into an agreement dated _____, 2025 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as 2025 Alley Paving Improvement Project, Project No. 211014 and is hereby referred to and made a part hereof; and W
hereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of ________________________________ dollars ($_______________) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

T
he condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one -year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

A
s a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obli gations, all to be taxed as costs and included in the judgment rendered.

A
s a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal s hall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faul ty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

W
henever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. C
omplete the Work in accordance with its terms and conditions; or

2. O
btain a bid or bids for completing the Work in accordance with its terms and

CD 6
conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount pa yable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2025.

(SEAL) (SEAL)

(Contractor) (Surety)
BY:
(Signature) (Signature)

Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________

CD 7

LABOR AND MATERIAL BOND

Whereas, the City Council of the City of Redlands, State of California, and ________________ (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated ____________, 2025, and identified as 2025 Alley Paving Improvement Project, Project No. 211014 is hereby referred to and made a part hereof; and

Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the af oresaid Code of Civil Procedure in the sum of ______________ dollars ($_____) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the sa me in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2025.

(SEAL) (SEAL)

(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________

THIS PAGE INTENTIONALLY LEFT BLANK

GENERAL CONDITIONS
(GC)

THIS PAGE INTENTIONALLY LEFT BLANK

GC 1

GENERAL CONDITIONS

The Standard Specifications for Public Works Constructions, 2021 Edition (Greenbook), together with supplements as published by Building News, Inc., are modified herein and comprise the Standard Specifications. For convenience, the section and subsection numbering system used in these modifications correspond to those used in the Greenbook. Unless specifically deleted or modified herein, all requirements of the Greenbook shall prevail.

SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS,

UNITS OF MEASURE, AND SYMBOLS

1-2 TERMS AND DEFINITIONS.

Agency - Amend as follows:
“The legal entity (City) for which the Work is being performed.”

Bidder - Amend as follows:
“Any individual, firm, partnership, corporation, or combination thereof, licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, submitting a Bid for the Work, acting directly or through a duly authorized representative.”

City. The City of Redlands, San Bernardino County, California, being the legal entity for which the Work is being performed. Also referred to as Agency or Owner.

City Council. The City Council of the City of Redlands, San Bernardino County, California, being the body authorizing entrance into legal agreements and allowing work in public right -of- way or on public property controlled by the City of Redlands. Also referred to as Board.

Engineer - Amend as follows:
“The City Engineer of the Agency, or other person designated by the City Engineer, acting either directly or through authorized agents.”

Fabricated. An item specifically assembled or made out of selected materials to meet individual design requirements.

Guarantee. See Warranty.

Laboratory. The designated laboratory authorized by the City of Redlands to test materials and work involved in the Contract.

Manufactured. A standard mass-produced unit or item meeting design requirements.

Owner. The City of Redlands, San Bernardino County, California.

Pavement. The uppermost layer of material placed on the traveled way or shoulder. Also referred to as surfacing.

GC 2

Rain Day. A scheduled working day when you cannot perform work on the controlling activity for at least 50 percent of the day with at least 50 percent of the normal labor and equipment due to adverse weather-related conditions that cause the Contractor to dismiss the crew.

Street - Delete and replace with the following:
“Any road, highway, parkway, freeway, avenue, street, lane, alley, crossing, intersection, court, place, circle, walk, way, or any public right-of-way within the jurisdiction of the Agency.”

Surety - Delete and replace with the following:
“An admitted corporate surety as listed by the United States Department of Treasury and duly licensed to conduct business in the State of California and County of San Bernardino and acceptable to the City of Redlands, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations incurred.”

Warranty. An extended insurance by the Contractor, of any product or item of work installed as a part of this project for replacement and/or repair for the time period specified, including but not limited to, all parts, labor, materials, tools, equipment costs, etc. necessary for the product or item of work to be in proper and acceptable working condition after completion of the project. For the purposes of this Contract, the period of coverage shall begin on the date of the Notice of Completion filed by the Owner.

Working Hours. Unless specified otherwise, working hours shall be from 7:00 AM to 4:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and City Holidays, as shown on the current year Construction Schedule, are excluded unless authorized by the City.

1-7.2 CONTRACT BONDS. - Add the following sentence to paragraph 1:

The warranty provisions set forth in Section 7- 18 shall be secured by the Contract Performance Bond required under this section and said Bond shall remain in full force and effect for a period of one year from the date of completion as specified in the Notice of Completion.

SECTION 2 - SCOPE OF THE WORK

2-2 PERMITS. - Amend the following:

Amend the first sentence of paragraph 1 as follows:
“The Contractor will obtain all permits necessary to perform the work in streets, highways, railways or other rights-of-way.”

Add the following sentence between the first and second sentences of paragraph 1:

For all work within Caltrans right -of-way, the Contractor shall obtain their own Caltrans Encroachment Permit and pay all necessary permit and inspection fees as required by Caltrans.

GC 3

Add the following paragraph:

The Contractor shall, prior to the start of work, procure all permits and licenses, including but not limited to, a City Business License for itself, subcontractors, and all parties performing actions associated with this contract within the City of Redlands , City Truck Route Permit, City Street/Lane Closure Permit, City Encroachment Permit, USA Verification Number, DOSH Excavation Permit, other permits required by agencies and/or utilities having jurisdiction on the work, pay all charges and fees required by the City, other agencies and utilities, and give all notices necessary and incidental to the due and lawful prosecution of the work. All City permits associated with this project are no fee to the Contractor.

SECTION 3 - CONTROL OF THE WORK

3-7 CONTRACT DOCUMENTS.

3-7.1 General. – Add the following paragraphs:

Contractor’s working drawings or plans for any structure not included in the plans shall be approved by the Engineer before any work is performed. It is mutually agreed that approval by the Engineer of the Contractor’s working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall be responsible for agreement and conformity of their working plans with the approved plans and specifications.

Finished surfaces in all cases shall conform with the lines, grades, cross sections, and dimensions shown on the approved plans. Deviations from the approved plans will be determined by the Engineer and approved in writing. In the event of a discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct.

Should it appear that the work to be done or any matter thereto is not sufficiently detailed or explained by the plans and specification, the Contractor shall apply to the Engineer for such further explanation as may be necessary and shall conform to such explanation or interpretation as part of the Contract so far as may be consistent with the intent of the original plans and specifications.

3-7.1.1 Preconstruction Meeting. The Contractor to whom the contract is awarded, and all his major subcontractors, shall attend a pre -construction meeting. The time and location of said meeting will be set by the City. Contractor will be given adequate notice of such meeting. It shall be the Contractor's responsibility to notify his subcontractors of the time and location of the meeting. All submittals as required under the General Requirements shall be submitted by the Contractor at the time of the meeting.

The Contractor will be provided with an electronic (.PDF file) of the conformed plans and specifications for their use throughout the project. Contractor is responsible for all costs of reproduction.

Progress meetings will be scheduled by the City. The Contractor will be given at least five working days notice of the time and location of said meetings. The Contractor has the responsibility of notifying his subcontractors, suppliers, and fabricators of the time and location of said meetings.

Meetings will be held either at the job site, at the offices of the City of Redlands, or at any other

GC 4

location approved by the City. The Contractor may request, in writing, that a meeting be held.

The City will schedule a meeting at the Contractor’s request not more than five working days after receiving said written notice.

3-7.2 Precedence of Contract Documents. – Replace paragraph 2 with the following:

The precedence shall be (A. being highest, O. being lowest):

A. Permits from other Agencies as may be required by law.

B. Change Orders.

C. Contract.

D. Addenda.

E. Bid Schedule/Proposal.

F. General Requirements.

G. Technical Specifications.

H. Plans.

I. MUED General Permit Conditions and Trench Specifications.

J. City of Redlands Water & Sewer Systems Standard Specifications.

K. General Conditions.

L. City of Redlands Standard Specifications and Detail Drawings for Design and Construction of Public Improvements and all Supplements
M. Standard Specifications for Public Works Construction (SSPWC), 2018 Edition N. Standard Plans for Public Works Construction, 2012 Edition O. Reference Specifications.

3-8.7 Record Drawings. The Contractor shall maintain at the job site, a set of record drawings for the work showing: exact location information of all existing underground utilities encountered, final locations determined in the field, any deviations from the plans and specifi cations and new work performed within the work area; and all differences between the work as drawn and as installed for all concealed work as well as work added which is not shown on the drawings. Concealed work shall mean all work installed underground or in an area which cannot be readily inspected by use of access panels, inspection plates or other removable features. When vacuum excavation (potholing) services are required, contractor to provide report that identifies depth and alignment of underground utilities.

These record drawings shall be kept current and legible, and shall be available for inspection at all times by the Engineer, Architect and Contractor. All information, changes in the work or work added on these record drawings shall be marked in red. All markings shall use the same legends that are used on the drawings. Indicate locations by exact dimensions and elevations. Give dimensions and elevations from a permanent reference point and prepare all changes to scale.

At the end of construction, the contractor shall prepare one set of marked- up prints of the record drawings indicating any and all revisions and changes to the drawings reflecting As-Built conditions.

The drawings shall also contain a listing of all subcontractors who worked on the construction project.

The As-Built drawings will be submitted to the Municipal Utilities and Engineering Department for review and approval by the City Inspector and Engineer.

The design engineer or City staff shall prepare the final As-Built drawings for record purposes in one of the following two ways: (1) Check out the original drawings from the City and manually revise the

GC 5

drawings to reflect the As-Built condition; or (2) Re-plot the original drawings electronically on 4 mil mylars and make revision s electronically to reflect the As -Built conditions. The final As -Built drawings will be reviewed and approved by the City Inspector and Engineer

The construction related bonds will not be released by the City until the As-Built drawings are accepted by the Engineer and all City stipulated conditions for the release of the bonds have been satisfied.

3-10 SURVEYING.

3-10.3 Line and Grade. - Add the following sentences to paragraph 1:

All distances and measurements shown are and will be made in a horizontal plane. Construction line and grade staking shall be set at maximum intervals of 25 feet when the grade is 0.50 percent or greater. Construction line and grade staking shall be set at maximum intervals of 12 feet when the grade is less than 0.50 percent.

3-10.4 Permanent Survey Markers.

The Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Profession Code shall be hired as a subcontractor or employed by the Contractor.

3-10.5 Survey Service.

Contractor shall be responsible for: furnishing all surveying and staking, horizontal and vertical, as shown on the plans and in accordance with the specifications; furnishing all staking for sub-grade and base course grades per typical sections; replacing any existing monuments and ties which have been destroyed by construction; identifying, locating and tying out all monuments and ties necessary within the work area; and shall reinstall all disturbed monuments and ties, supplying the Engineer with copies of monument and tie sheets recorded with the County Surveyor in accordance with applicable State law. Monuments shall be approved by the Engineer.

Surveying and staking shall be done by a Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Professions Code.

Unless otherwise specified, stakes will be set and stationed by the Contractor’s surveyor for curbs, headers, sewers, storm drains, structures, rough grade and all other staking necessary for the construction of the work. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet to be supplied to the Engineer. The Contractor shall dig all holes necessary for line and grade stakes.

3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.

3-13.2 Acceptance. - Add the following paragraphs:

The Contractor shall submit written assertion that the work has been completed prior to the Engineer making final inspection. The Engineer will have 48 hours to inspect the work. If the Engineer determines that the work is not complete, written notice will be given.

GC 6

Until final acceptance of work by the Engineer, the Contractor shall have charge and care thereof from damage caused by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all injuries or damage to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof.

All work which has been rejected shall be remedied or removed and replaced by the Contractor at their expense with work conforming to the plans and specifications. Any defective material or workmanship which may be discovered before final acceptance or within one year from the date of final acceptance shall be immediately corrected by the Contractor at their expense, notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor ’s ultimate responsibility to deliver a complete, operational project that complies in all details with these specifications, at the time of final acceptance.

Any omission or failure on the part of the City to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed as acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The City will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the City is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

Nothing in this section shall be construed to limit the rights of the City to immediately correct conditions which are unsafe or which pose a public health nuisance. Should said corrections later be found to be caused by defective material and/or workmanship, the Contractor and their surety shall reimburse the City for costs reasonably incurred while attending the situation.

In the event it is necessary for the City to file suit to enforce any liability of the Contractor pursuant to this Section, the City shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees including reasonable attorneys’ fees incurred by the City in successfully enforcing the Contractor’s obligation, all to be taxed as costs and included in any judgment rendered.

3-13.3 Warranty. - Amend the following:

Amend the first sentence of the paragraph 3:
“The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence from the date of the final acceptance, except where longer warranty periods are specified.”

Add the following paragraphs:

All start-up and testing shall be complete, approved and accepted before final acceptance, substantial completion, or beneficial occupancy.

GC 7

The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the specifications or by law. The remedies provided herein shall not be exclusive and the City shall be entitled to any and all remedies provided by law.

3-14 INSPECTION.

The Contractor shall notify the Engineer at least 24 hours in advance before inspection is required.

Whenever the Contractor varies the period during which work is carried on each day, due notice shall be given to the Engineer so that proper inspection may be provided. Varied working hours may be allowed only upon written authorization from the Engineer.

Work financed in whole or in part with funds from another public entity or performed within the jurisdiction of another public entity shall be subject to inspection at all times by authorized representatives of that entity.

The work shall be ready for inspection, whether by City, other public entities or independent testing laboratories, at the scheduled times arranged by the Contractor. If, in the City’s sole judgment, the work is not ready and the inspection must be rescheduled, the Contractor shall be notified. The Contractor shall reschedule the inspection and provide the proper 24 hour notification for the rescheduled inspection. Any costs incurred by the City for rescheduled inspections shall be reimbursed prior to the release of Bonds.

In order to allow for inspection, the Contractor shall notify the City’s inspector sufficiently in advance of the permanent concealment of any materials or work. The City’ s inspector shall make the appropriate notifications to other public entities and independent testing laboratories for inspections.

All inspections required in the specifications for this project shall be coordinated through the City’s inspector.

If any work is concealed or performed without the prior notice specified, the work shall be subject to such tests or exposure as may be necessary to prove to the City, Architect and Engineer, that the materials used and the work performed are in conformity with the drawings and specifications. All labor, tools, materials and equipment necessary for exposing and testing shall be furnished by the Contractor at their expense. The Contractor shall replace at their expense, any materials or work damaged by exposure or testing.

Overtime inspection may be requested by the Contractor. Overtime inspection includes but is not limited to, any hours worked outside of the inspector’s normal working hours including weekends and holidays. Such requests shall be on a case-by-case basis as determined by the Engineer. If the Engineer so determines and approves, overtime inspection shall be paid for by the Contractor at the current City billing rate at the time of request or as billed by other public entities or independent testing laboratories. Any costs incurred by the City for overtime inspection shall be reimbursed prior to the release of Bonds.

SECTION 4 - CONTROL OF MATERIALS

4-1 GENERAL. - Delete and replace with the following:

GC 8

Should any work performed or material furnished under the Contract prove defective or not in accordance with the Plans and Specifications and in the opinion of the Engineer such defect is not of sufficient magnitude or importance to make the work dangerous or unusable, or if the removal of such work is impracticable or will create dangerous or undesirable conditions, the Engineer at his discretion shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefore in the payment due the Contractor as may be just and reasonable.

4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials supplied and equipment installed and incorporated in the work and agrees, upon completion of all work, to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him, to the Owner free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Owner.

4-1.2 Clayton Act. In submitting a bid to the City, if the bid is accepted the Contractor agrees it will assign to the City all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (chapter 2 [commencing with Se ction 16700] of Part 2 Division 7 of the Business and Professionals Code), arising from purchases of goods, materials, or services by the Bidder for sale to the City pursuant to the bid. Such assignment shall be made and become effective at the time the City tenders final payment to the Bidder.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES

5-1.1 CONTRACTOR’S EQUIPMENT AND FACILITIES.

A noise level limit of 86 dbA at a distance of 15 m (50 feet) shall apply to all construction equipment on or related to the work whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided, except in those cases required for the protection of personnel.

5-1.2 General.

The enclosed toilets required by this section shall be located within an approved yard, if one is acquired by the Contractor. If a yard is not acquired by the Contractor or the project is not within a City owned property, the toilets must be installed on a trailer and removed from the jobsite each day.

At no times shall toilets be stored within the public right of way outside of working hours.

5-3 LABOR. - Amend the following:

GC 9

5-3.1 General. - Add the following paragraphs:

Employment of apprentices are required on projects of $30,000 or more . Provisions in Sections 1777.5 of the California Labor Code fixes responsibility of compliance with that section for all apprenticeable occupations with the Contractor. Section 1777.5 provides that the Contractor and every Subcontractor shall submit contract award information to the applicable joint apprenticeship committee. One apprentice hour for every five journeymen hours worked is the minimum State requirement applicable to each apprenticeable trade. Section 1777.7 of said Labor Code provides that the Contractor shall forfeit as a civil penalty the sum of one hundred dollars ($100.00) for each calendar day of noncompliance with provision of said Section 1777.5.

The Contractor will observe all applicable health and safety requirements, including, but not limited to the California and Federal Occupational Safety and Health Acts. The Contractor shall submit for review by the City a Site Specific Health and Safety Plan prior to the commencement of construction activities. This Plan shall meet or exceed the requirements of 29 CFR 1910.120.

5-3.2 Prevailing Wages. - Add the following paragraphs:

Contractors are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City Council of the City of Redlands, California, by Resolution No. 2326, has ascertained the general prevailing rate of hourly wages and rates for legal holidays and overtime work in the locality where this work is to be performed, for each craft or type of workman or mechanic needed to execute the Contract which will be awarded to the successful Bidder. The Contractor shall comply with Sections 1770 to 1780 inclusive of the Labor Code and Master Labor Agreement of Southern California.

The Contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this Contract in full less legally required deductions and also deductions made pursuant to the regulations prescribed under the so-called “Kick- Back Statute” (48 Sta. 948; U.S.C. 875; 40 U.S.C. 276c).

In accordance with Section 1775 of the California Labor code, Contractor shall forfeit to City, as a penalty, a minimum of $40 for each day, or portion thereof, and a maximum of $200 for each day, or portion thereof, for each worker paid, either by Contrac tor, or any subcontractor, less than the prevailing rates as determined by the Director of the California Department of Industrial Relations for the work.

Contractor further agrees to fully comply with all applicable provisions of the California Labor Code including but not limited to Sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Failure to abide by prevailing wages and laws by Contractor will be enforced.

The Contractor or subcontractor shall, as a penalty, to the State or political subdivision on whose behalf the contract is made or awarded forfeit twenty-five ($25) dollars for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any calendar day and 40 hours in any calendar work in violation of Labor Code section 1813.

5-3.3 Payroll Records. – Delete and replace with the following:

GC 10

The contractor and subcontractors shall submit electronic certified payroll on a weekly basis to the City of Redlands through LCPtracker. LCPtracker is a web -based labor compliance management system. The Prime Contractor and Subcontractors and lower-tier Subcontractors will receive an email from LCPtracker providing their log-on identification and temporary password. The Contractors will need to follow the instructions in the email to set -up their permanent password and activate their account. Once their account is setup, LCPtracker Inc. provides either computer based or web based training. Training can be accessed via the “Book Now” button located under the “Projects” tab. The prime contractor shall submit their certified payroll, along with any subcontractor who is performing any labor, on a weekly basis. The prime contractor is responsible for all communication with their subcontractors and shall submit their subcontractor’s certified payroll as part of their weekly payroll packet. All labor compliance correspondence and submissions will be made through the LCPtracker software.

All certified payroll shall be submitted no later than 7 days from the close of the pay period. The payroll records shall set out accurately and completely the name, social security number, classification and hourly wage rate of each employee, hours worked by employee during the payroll period and a full weekly wages and the actual weekly wages paid to the employee. Such certified payroll records shall be made available at all time for inspection by the City, the Department of Industrial Relations, the Department of Labor or authorized representatives within ten days of request. The contractor and subcontractor shall preserve weekly payroll records for a period of three (3) years from the date of completion of the Contract. In case on noncompliance with said Section 1776 and after a ten-day period following receipt of written notice, the Contractor shall forfeit to the California Department of Industrial Relations one hundred dollars ($100.00) for each calendar day or portion thereof, for each worker in non-compliance, until compliance is effectuated.

In order to meet labor compliance requirements, all contractors will be required to complete eDocuments which are accessed, submitted and approved through LCPtracker. All eDocuments are required to be signed by an owner/officer or authorized signer. The Pr ime Contractor and each Subcontractor and every lower-tier Subcontractor and any Vendors subject to this provision shall comply with Title 8, Section 16404 of the California Code of Regulations.

A Fringe Benefit Statement shall be submitted with the first payroll and is required for both the prime contractor and any subcontractors. A new Fringe Benefit Statement will be required when general determinations are issued in February and August. Please refer to the DIR website for additional details. Any weeks where no work was performed must be represented by the submittal of a Statement of Non-Performance covering the 7 day pay period where no hours were worked on the site. Final payroll on the project should state “Final” on the certified payroll, and must be marked as such in the LCPtracker system.

Failure by the Contractor to comply with the aforementioned requirements shall result in withheld progress payments until such time certified payroll documents have been received, reviewed, and accepted by the City. The City reserves the right to seek ass istance from the State Department of Industrial Relations in determining the acceptability of certified payroll submittals before release of withheld progress payments. Prior to the release of retention monies, all certified payroll must be submitted on the project and any outstanding issues that may have occurred throughout the project must be resolved.

GC 11

5-4 INSURANCE. - Delete Section 5-4.1, Section 5-4.2 and replace with the following:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract.

Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non -contributing to any insurance or self -insurance maintained by the City. All liability insurance policies shall bear an endo rsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Designated Insurance Requirements shown below.

TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
 $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits and
Conduit Construction (streets) Grading of Land Street Cleaning Caisson or Cofferdam Work Hazardous Materials Contractors Street or Road Construction Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting, Spraying
or Removal

GC 12

 If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

b. Business Auto Liability
 $1 Million Combined Single Limit
 City listed as an Additional Insured on the coverage
 Must include liability arising from all owned, leased, hired, and non-owned autos  If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission  If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements.

c. Commercial Umbrella/ Excess Liability
 $5 Million Per Occurrence/ Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

d. Workers Compensation
 $1 Million Per Occurrence for Bodily Injury by Accident  $1 Million Each Employee for Bodily Injury by Disease  $1 Million Policy Limit for Bodily Injury by Accident  Waiver of Subrogation in favor of City
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

e. Pollution Policy (Hazardous Materials) [If Applicable]  Required of Projects that involve Demolition and/or Excavation Activities  $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage

CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC) Systems
(service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair)
Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors

GC 13

TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
 $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage
 Coverage is primary and non-contributory
 If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

b. Business Auto Liability
 $1 Million Combined Single Limit
 City listed as an Additional Insured on the coverage
 Must include liability arising from all owned, leased, hired, and non-owned autos  If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission  If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements.

c. Workers Compensation
 $1 Million Per Occurrence for Bodily Injury by Accident  $1 Million Each Employee for Bodily Injury by Disease  $1 Million Policy Limit for Bodily Injury by Accident  Waiver of Subrogation in favor of City
 If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission

d. Pollution Policy (Hazardous Materials) [If Applicable]  Required of Projects that involve Demolition and/or Excavation Activities  $1 Million Per Occurrence/ $2 Million Aggregate
 City listed as an Additional Insured on the coverage
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees a nd agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees.

To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

GC 14

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given.

The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.

5-4.3 Worker’s Compensation Insurance. - Delete and replace with the following:

A. Contractor shall have worker’s compensation and employer’s liability insurance in force throughout the duration of the contract in an amount which meets the statutory requirement with an insurance carrier acceptable to the City. The insurance policy shall include a provision prohibiting cancellation of said policy except upon forty-five (45) days prior written notice to City. Certificates of Insurance shall be delivered to the City at the time of the Contractors’ execution of the agreement.

B. Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employee s and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

5-6 PATENT FEES OR ROYALTIES. Delete and replace with the following:

The Contractor shall include in its Bid the patent fees or royalties on any patented article or process which may be furnished or used in the Work. The Contractor shall indemnify and hold the City

GC 15

harmless from any legal action that may be brought for infringement of patents. The Contractor’s attention is directed to “Notice of Patents, Data, and Copyright Regulations” of the Federal Labor Standards.

The Contractor shall bear all costs arising from the use of patented goods and/or processes used on and/or incorporated into the Work. When use of these goods and/or processes is judged to be an infringement and the use is banned, the Contractor, at its own expense, shall, with concurrence of the Engineer, do one of the following:

A. Secure for the City the right to continue using goods and/or processes by suspension of the injunction or by procuring a license(s);

B. Replace said goods and/or processes with non-infringing goods and/or processes;

C. Modify said goods and/or processes so that they become non-infringing; or

D. Remove said goods and/or processes and refund the sum paid therefore without prejudice to any other rights of the City.

The preceding shall not apply to any goods manufactured to the detailed design of the City contained in the Contract Documents.

5-7 SAFETY.

5-7.1 Work Site Safety.

5-7.1.1 General. - Amend the following:

Add the following sentences to paragraph 1:

Should watering be the sole method utilized for roadway dust abatement purposes, the maximum time interval that shall elapse between applications thereof shall be no greater than 3 hours during normal working day, supplemented by an additional application thereof immediately prior to the conclusion of the workday and at such other times as may be required, including evenings, weekends and holidays as required by the Engineer. Should the Contractor be unable to furnish dust abatement as specified, the City may perform or cause to be performed the necessary service, the expense of which will be deducted from the payment due the Contractor.

Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during cleanup and dust control operations. Refer to Section 7-8.6.

Compliance with this section is of extreme importance to the City and its citizens. The City may fine the Contractor $1,000 per incident if there are issues with dust, mud, unused equipment or materials and rubbish within the construction area that result in citizen complaints. A 24 hour notice shall be issued to the Contractor and failure to correct the problems will result in the fine being levied. This fine will be in addition to those fines potentially charged for NPDES violations.

GC 16

5-8 AIR POLLUTION CONTROL.

Dust control shall be performed in accordance with Subsection 7-8 of the Standard Specifications, South Coast Air Quality Management District (SCAQMD) Rule 403, the general Provisions and the following Provision.

Dust resulting from the Contractor’s performance of the work, either inside or outside, the right-of- way shall be controlled by the Contractor. Dust control includes the action necessary to prevent, reduce or control dust within the work area as required to complete the work. The Contractor shall carry out proper and efficient measures to prevent his operations from producing dust in amounts damaging to property or causing a nuisance, or harm to persons living nearby or occupying buildings in the vicinity of the work. The Contractor shall control dust 24 hours a day, seven days a week. The methods to be used for controlling dust in the construction area and along haul roads shall be approved by the Engineer prior to starting any work. The Rule 403 Implementation Handbook published by the SCAQMD, contains a detailed listing of reasonably available dust control measures.

Dust control ordered by the Engineer to be applied on Saturdays, Sundays or holidays will be included in the Contract price for dust control and no additional compensation will be allowed therefore.

The full compensation for all direct and indirect costs incurred for work performed or materials used to control dust resulting from the Contractor’s performance of the work and caused by public traffic, either inside or outside the right-of-way shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefore.

5-9 STORAGE OF EQUIPMENT AND MATERIALS.

The Contractor shall be required to provide and maintain as necessary, any additional property required for storage of equipment, materials, etc., to perform work on this project. Should the additional property be located within the city limits of the City of Redlands, the Contractor shall obtain written approval from the City of Redlands Development Services Department and comply with all conditions set therein prior to use. When private property is used for a yard area, the Contractor shall also secure written authorization from the private property owner and supply a copy of such to the City before any monthly progress payment is submitted. Contractor to propose designated areas of the project site, upon approval by the Engineer , suitable for material delivery, storage, and waste collection.

The Contractor shall ensure the construction yard adheres to all local, State and Federal regulations, ordinances, codes and maintained in a neat and orderly manner throughout the duration of the project.

The contractor shall include the construction yard in the Erosion Control Plan or SWPPP and shall be inspected and approved prior to use of the yard. If at any time during the project the location of the construction yard changes from the approved site, the City shall be notified prior to relocation for inspection and approval. Should the Contractor fail to comply with these conditions, the Engineer may suspend the work per SSPWC section 6-3 until the condition is corrected.

GC 17

At the end of the project or as required, the Contractor shall: clean up and remove all trash and debris, including all organic trash and debris; clean up and remove all hazardous and biochemical wastes from the property to the satisfaction of the agency ( City, County, State, or Federal) charged with overseeing these items; and provide to the City a written release from the private property owner that they are satisfied with all clean up and removal work.

5-9.1 Storage in Public Streets.

Construction materials and equipment shall not be stored within public streets or right of way without prior approval from the City. In order to seek approval, Contractor shall submit a location map with all equipment or materials identified including size, duration and any BMP’s installed and provide at least 7 days for review by the City.

5-10 WATER POLLUTION CONTROL.

The Contractor shall follow the City's guidelines for Storm Water Pollution Prevention in providing storm water pollution control at the project site, including the implementation of approved Erosion/Sediment Control Plans during construction as well as the implementation of approved Water Quality Management Plans.

Construction activities disturbing 1 acre or more of land shall comply with the State Water Resources Control Board’s NPDES General Construction Storm Water Permit. A copy of the Notice of Intent (NOI) to include the Waste Discharge Identification (WDID) number shall be submitted as part of the Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review. Call (909) 782- 4130 for NOI/WDID information.

All projects requiring grading shall submit to the City for review and approval an Erosion/Sediment Control Plan and a Grading Plan. Permit(s) will not be issued until plans are approved and may be revoked if work required in these specifications are not complied with.

Construction sites shall be maintained by implementation of BMPs in such manner that pollutants are not discharged from the site to the maximum extent practicable. A few references available to help with selection and implementation of applicable BMPs are:

1. California Storm Water Best Management Practice Handbook, American Public Works Association, March 1993;

2. The Construction Site Best Management Practices Manual, November 2000;

3. Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual, November 2000;

4. California Regional Water Quality Control Board’s San Francisco Bay Region, Guidelines for Construction Projects; and

5. California Regional Water Quality Control Board’s San Francisco Bay Region, Erosion and Sediment Control Field Manual, July 1999.

All discharges into the storm drain system are prohibited except for potable water, properly treated discharge, and those discharges specifically approved by the Engineer. The following are some of the prohibited discharges:

GC 18

1. Discharges that could have an impact on human health or the environment, cause or threaten to cause pollution, contamination, or nuisance;

2. Discharges that exceed any applicable water quality standard contained in a statewide Water Quality Control Plan or local Basin Plan; and

3. Discharges containing hazardous substances equal to or in excess of a reportable quantity listed in Federal regulations 40 CFR, Parts 117 and 302.

Materials that can cause or contribute to pollution or a violation of any applicable water quality standard include, but are not limited to: sediments; solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides or herbicides and wood preservatives or solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants or hydraulic, radiator and battery fluids; fertilizers; vehicle and equipment wash water or concrete wash water; concrete, detergent or floatable wastes; wastes from any engine and equipment steam cleaning or chemical degreasing; and chlorinated potable water line flushings.

Unless exempted or authorized by an NPDES permit, all non-storm water discharges require prior approval by the Engineer or the State Water Resources Control Board with Engineer approval.

During construction, temporary storage of such materials as identified above, must occur in a designated area physically separated from potential storm water runoff, with ultimate disposal in accordance with local, state and federal requirements.

De-watering of contaminated groundwater or discharging contaminated soils via surface erosion is prohibited.

Unless indicated otherwise by the Engineer, all projects, regardless of size, shall submit for review and approval, a Water Quality Management Plan (WQMP). The WQMP shall consist of post construction BMPs which shall remain in effect throughout the life of the facility. Refer to WQMP guidelines.

5-11 TEMPORARY LIGHTS, POWER AND WATER.

Any water drawn from a City fire hydrant shall be via a City owned water meter. Said meter may be obtained from the Municipal Utilities & Engineering Department. Contractor is responsible for payment of a $1200 deposit fee. Said meter shall be returned in a condition like received, less normal wear and tear. All meters are loaned subject to the conditions of the Fire Hydrant Construction Meter Water Service Application. Contractor must provide proposed location of meter and notify Customer Service at (909) 798-7516 each time the meter is relocated during construction. Water reasonably used in connection with the construction contract will be provided at no cost to the Contractor. Water use determined to be wasteful or unreasonable will be charged for at the prevailing rate.

5-12 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.

GC 19

The Contractor shall relocate, re-establish, repair or replace all existing improvements within the work limits or right-of-way which are not designated for removal (e.g., sprinkler systems, curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations.

Relocations, re- establishments, repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing or re- establishing existing improvements shall be included in the Bid.

The Contractor shall be responsible for the maintenance of the streets and roadways to be used by public and local traffic through and adjacent to the construction zone, from the date of "Notice to Proceed" until the date of acceptance of the completed construction improvements.

Street maintenance shall include filling of potholes, grading of subgrade and base, replacing signs, installing interim pavement striping and markers on the project streets and other side streets within the construction zone. Street maintenance shall also include sweeping and washing of streets, adjacent and connected to the construction zone on a weekly, or more frequent schedule, to prevent the accumulation of dust, dirt, gravel or other deleterious materials, all as necessary to maintain the construction roadways and adjacent streets in a safe, clean and drivable condition for use by public and local traffic.

Upon request from the City for information pertaining to a claim against the contractor, contractor shall provide a written/email response, including all requested information, within 14 calendar days of City’s request. If a response with all requested information is not provided to the City within 14 calendar days, a penalty of $500 per calendar day will be assessed to the Contractor by the City.

5-13 PUBLIC CONVENIENCE AND SAFETY.

5-13.1 General.

The Contractor may be allowed to close the roadway, or a portion thereof, to traffic during normal work hours upon approval from the Engineer. During any closure, the Contractor shall allow access for residents, schools, trash service trucks, churches and businesses within the affected portion of roadway, except as required for construction for a reasonable period of time. The Contractor shall notify residents as noted within Section 5-18.

The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the Work Area Traffic Control Handbook (WATCH) prepared by the Southern California Chapter of the American Public Works Association. During adverse weather or unusual traffic or working conditions additional devices shall be placed as directed by the engineer.

All traffic signs and devices shall conform to the current State of California, Department of Transportation (CALTRANS), "Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways", unless otherwise approved by the Engineer.

GC 20

Fences, barriers, lights and signs shall be furnished, erected and maintained as necessary to give an adequate warning to the public at all times that the work is under construction and of dangerous conditions to be encountered as a result thereof, and warning and directional signs shall also be erected and maintained as may be required by the City. Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the following provisions:

1. For placing of barricades - $15.00 per barricade for each day or part thereof.

For flashers - $15.00 per flasher for each day or part thereof.

For traffic cones - $7.50 per cone for each day or part thereof.

2. In the event that the services of the Owner are required outside the normal working hours and/or days or items not noted above are furnished by the City, all costs incurred by the City shall be the responsibility of the Contractor.

The Contractor shall relocate, preserve and maintain the visibility of all signs within the project limits which affect the flow of traffic, as directed by the engineer. Any signs that are missing or found damaged shall be replaced immediately by the Contractor at his expense.

The Contractor shall provide and maintain Class II barricades along excavation edges parallel to the flow of traffic at a spacing of twenty-five feet (25'). Class II barricades mounted with flashers shall be installed around work areas in parkways. Class II barricades shall have alternating black and reflectorized white (or yellow) stripes at an angle of 45 degrees. The stripe with shall be four to six inches.

During paving operations barricades may be supplemented with minimum size eighteen-inch (18") high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty-five feet (25"). At all access poin ts such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five -foot (5') intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a "Road Closed" sign shall be provided. "No Left Turn" sign shall be provided wherever required by the Engineer.

Clearances from traffic lanes shall be 5 feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator or other vertical obstruction.

A 4 foot wide pedestrian walkway shall be maintained in the parkway area on each side of all streets, unless otherwise authorized by the Engineer. The minimum clearance from: the edge of pedestrian walkways to any traffic l ane shall be 5 feet; the edge of pedestrian walkway s to any work zone shall be 3 feet; and the surface of pedestrian walkways to any over head obstruction shall be 7 feet.

GC 21

The Contractor shall, at the end of each work day, have backfilled, compacted and placed a temporary drivable roadway surface on all work areas within traveled roadways prior to leaving the job site. Failure to comply to the satisfaction of the Engineer shall result in immediate correction by City forces, and all costs shall be borne by the Contractor.

Traffic control devices shall be marked with the Contractor’s name as appropriate. At no time shall any traffic control devices marked with companies or agencies other than the Contractor or subcontractors, be utilized within the work area.

All said traffic controls and safety devices shall be maintained in clean condition, with any and all graffiti removed by the end of workday on which the graffiti was first reported to the Contractor.

If the traffic control devices are deemed unacceptable by the Engineer due to being damaged, dirty, or marked incorrectly, the Contractor shall replace the traffic control devices immediately. Should the Contractor fail to furnish traffic control devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the provisions above.

5-13.1.1 Vehicular Access.

At such times as driveways are inaccessible due to the Contractor's work they shall be blocked by two (2) Class II barricades or one (1) Class II barricades and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a delineator at each side.

5-13.1.2 Signage. The Contractor shall furnish, erect and maintain all construction traffic signage as required and specified.

All construction traffic signage shall be in place prior to commencing any work, placed as needed during construction, moved as necessary and removed only upon completion of all work.

All construction traffic signage and controls shall comply with the State of California Manual of Traffic Controls, Warning Signs, Lights and Devices for use in Performance of Work Upon Highways. All construction traffic signage used in the performance of the work shall be a minimum of the encapsulated lens (high intensity) type. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, del ineators, flashing warning lights, barricades, high level warning devices, telescoping flag trees, flags, signs, markers, portable barriers, flashing arrow signs, changeable message signs, markings and flagging equipment shall be provided and maintained in like new condition.

When a Traffic Signal is constructed as a part of the project, the Contractor shall place and maintain for one calendar month, a message board for each approach leg to a new traffic signal. The message board shall read “CAUTION - NEW TRAFFIC SIGNAL”. The one month period shall begin from the day of activation. This requirement may be lessened or waived, on a case-by-case basis, by the Engineer.

The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, including holidays, all said

GC 22

devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedest rian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of notice to proceed to the completion and acceptance of t he work. Any corrective work required to be performed by City forces shall be charged to the Contractor and paid in full before release of any bonds on the project.

All traffic cone s shall be no less than 28 inches in height, exc ept that shorter cones, 12 inches minimum height, may be permitted during striping maintenance operations where the only function of the cone is to separate traffic from the wet paint. All barricades used to delineate traffic at night or placed in or adjacent to the traveled roa dway at night, shall be equipped with flashing warning lights.

Channelizers shall be required when lane restrictions, detours or other work conditions need to be maintained for periods longer than normal work hours. Channelizers shall be surface -mounted type and shall be furnished, placed and maintained at the locati ons shown on the plans or as approved by the Engineer and shall conform to these specifications. Channelizers shall be, at the Contractor’s option, one of the following types, or approved equal: (1) Safe -Hit SH236SMA; (2) Repo “The Replaceable Post”; or (3) Carsonite, “Super Duck” SDF-436.SDF-436.

5-13.2 Traffic Control Plan
The Contractor shall provide a Traffic Control Plan to the agency for approval prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days.

The Contractor shall be required to maintain one lane in each direction when working on the roadway.

Access to schools, businesses, etc. shall be maintained as necessary for their operations. If closures are authorized by the Engineer, all detour signage shall be installed prior to closure of specified portion of roadway(s), and shall be maintained during closure.

The Contractor shall make provision to allow pedestrians full access across work areas at existing crosswalks, while working within those areas.

Traffic controls, including but not limited to vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access, detours, and street closures shall be in accordance with Subsection 7-1, of the current edition of the "Standard Specifications for Public Works Construction," including all its subsequent amendments, and the current edition of the "Work Area Traffic Control Handbook."

Traffic control and the Traffic Control Plan shall conform to the following:

a. All major streets shall remain open to through-traffic at all times, residential street will be closed to traffic only as long as it takes for material application and drying time.

b. The Traffic Control Plan shall indicate the traffic control requirements for the different types of work to be performed. The Contractor shall be

GC 23

responsible for the preparation of Plans as necessary for specific items of work. These Plans shall be approved by the City's Engineer.

c. All traffic controls and safety devices, equipment and materials, including but not limited to cones, delineators, flashing warning lights, barricades, high level warning devices (flag trees), flags, signs, markers, portable barriers, flashing arrow sig ns, markings, and flagging equipment shall be provided and maintained in "like new" condition.

d. The Contractor shall furnish and properly install, construct, erect, use, and continuously inspect and maintain, twenty- four (24) hours per day, seven (7) days per week, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necess ary to include area affecting or affected by the work, from the start of work to the completion of the work.

In the event the slurry and cape seal ravels, a "loose gravel" (C6) sign shall be placed to adequately warn the public.

e. High-level warning devices (flag trees) are required at all times for any work being performed within the roadway unless otherwise specifically authorized by the City's Engineer.

f. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than twenty- eight inches (28") in height, except that shorter cones, twelve inches (12") high or higher, may be used during striping maintenance operations where the only function of the cones is to protect the wet paint from the traffic.

g. Type III barricades, no less than six feet (6') in length and equipped with two (2) Type "N" markers each and two (2) flashing warning lights each, shall be used to close streets, except as otherwise specifically authorized in advance by the City's Engineer for minor maintenance work of no more than one (1) working days duration on weekdays, or on holidays only, and between 8:00 a.m. and 3:30 p.m. only. Said barricades shall be placed across the full roadway at each point of closure with the distance be tween barricades or between barricades and curbs, not exceeding three feet (3'), except that one (1) eleven -foot (11')-wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street's center, facing the inbound vehicular traffic, shall also be equipped with one (1) Type C2 "Road Closed" sign each or one (1) Type C3A "Road Closed to Thru Traffic" sign each.

GC 24

h. Except for residential streets, as otherwise directed and/or authorized by the City's Engineer, two-way vehicular traffic shall be maintained at all times within two (2) eleven foot (11') -wide lanes on streets, having an effective roadway width of forty-four feet (44') or more with restricted parking, and other streets of lesser widths may be reduced to one (1) twelve -foot (12') wide lane with work activity being limited to one side at a time, and with one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers.

No reduction of the traveled way width shall be permitted on any City street before 8:00 a.m. nor after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless prior authorization to do so is granted by the City's Engineer.

Arrow boards shall be required for all lane closures on major streets.

i. Properly trained and experienced flaggers shall be provided to traffic when said traffic is to be interrupted, when two- way traffic is to be reduced to one-way traffic, and at such other times as is necessary to safely pass the traffic through or around the work area, and when so directed by the City's Engineer.

j. Vehicular access to occupied residential property may be restricted on weekdays other than holidays between the hours of 8:00 a.m. to 3:30 p.m. while essential work activity is taking place, with specific prior written approval from the City's Engineer, providing the Contractor gives the owner and/or resident at least forty -eight (48) -hour advance written and oral notice. See Part 2, "Notification of Residents," herein.

Convenient and safe pedestrian access to occupied residential property shall be maintained at all times. Access to mailboxes must be maintained at all time, such that the postal delivery service is not interrupted.

Access to vacant and unused property may be restricted at the Engineer's discretion. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the City's Engineer.

k. Any traffic control and safety devices and equipment being used which becomes damaged, destroyed, faded, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired refurbished and/or replaced, and any traffic control and safety devices and equipment being used which are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.

GC 25

l. An unobstructed view of all signs and warning devices including but not limited to stop signs, stop ahead signs, street names signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers, and devices from the view of vehicular and/or pedestrian traffic to which it applies.

m. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.

n. Stockpiling and/or storage of materials on any public right -of-way or parking areas will not be allowed without specific permission of the Engineer. Materials spilled along or on said right -of-way or parking areas shall be removed completely and prompt ly. All stockpile and/or storage areas shall be kept in a safe, neat, clean, and orderly fashion, and shall be restored to equal or better than original condition upon completion of the work.

o. Where vehicular access to abutting property must be restricted, the work shall be so selected, arranged, and scheduled that the person(s) requiring access to said abutting property and/or residents along said streets affected will be able to park within a reasonable distance of not more than five hundred feet (500') from their homes and/or destination. Residents must be supplied written notice of such restrictions a minimum of 48 hours in advance.

p. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, "NO PARKING" signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street except as otherwise authorized or directed by the City's Engineer.

q. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to hereinabove, the City reserves the right to correct and/or mitigate any situation, which in the sole opinion of the City's Engineer constitutes a serious deficiency and/or serious case of noncompliance, by any means at its disposal at the Contractor's and/or permittee's expense, and will deduct the cost therefore from the Contractor's progress and/or final payment. Such corrective action taken by the City shall not reduce or abrogate the Contractor's legal obligations and liability for proper traffic control and safety measures, and shall not serve to transfer

GC 26

said obligations and liabilities from the Contractor to the City or the City's agents.

r. Violations of any of the above Provisions and/or Provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the City's Engineer, shall at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor and/or permittee, or liability to the City, all as prescribed by Contractual obligation or State law, whichever is applicable.

Full compensation for furnishing all labor, materials, tools, equipment, flaggers, lights, channelizers (surface mounted), temporary striping, barricades, portable flashing lights, flashing arrow signs, traffic control and detour plan, and incidentals required to comply with the provisions specified and referred to herein above, to provide all required traffic and pedestrian control for the duration of this contract, all as shown and as specified, shall be paid as specified in Section 01200 of the General Requirements and no other compensation shall be made therefore.

5-13.3 Edison Energized Conductors. The Contractor hereby promises and agrees that in the performance of the Work, he will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to Edison's secondary, primary and transmission facilities. The term "qualified person" is defined as follows:

"Qualified Person". A person by reason of experience or instruction is familiar with the operation to be performed and hazards involved.

Contractor further promises and agrees that the provisions of this paragraph shall be and are binding upon any Subcontractor or Subcontractors that may be retained by it, and that the Contractor shall take such steps as are necessary to insure compliance by said Subcontractor or Subcontractors with the requirements of this paragraph.

5-14 CONTRACTOR’S RESPONSIBILITY FOR DAMAGE.

5-14.1 Responsibility for Damage. The Contractor agrees to and does hereby indemnify, defend and hold harmless the City, its elected officials and the Consultant and their officers, agents and employees from every claim or demand made, and every liability, loss, damage, or expense of any nature whatsoever, including attorney's fees and costs, which may be incurred by reason of:

(a) Liability for damages for (1) death or bodily injury to persons, (2) injury to loss or theft of property, (3) any other loss, damage or expense arising under either (1) or (2) above, sustained by the Contractor or any person, firm or corporation employed by the contractor upon or in connection with the work called for in this agreement, except for the liability resulting from the sole negligence or willful misconduct of the City, its elected officials and their officers, employees and agents who are directly employed by the City and the Consultant; and

GC 27

(b) any injury to or death of persons or damage to property caused by any fault, neglect, default or omission of the Contractor, or any person, firm or corporation employed by the Contractor, either directly or by independent contract, including all damages due to loss or theft, sustained by any person, firm or corporation, including the City, arising out of, or in any way connected with the work covered by this agreement, whether said injury or damage occurs either on or off City property, provided that any of the foregoing (1) is attributable to personal injury, bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself), including the loss of use resulting there from, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, any supplier, anyone directly or indirectly employed by any of them or anyone for whose act or omissions any of them may be liable, regardless of whether or not caused in part by any act or omission (active, passive, or comparative negligence included, excepting the active negligence of the District) of a party indemnified hereunder.

(c) The Contractor, at its own expense, cost, and risk shall defend any and all actions, suits or other proceedings that may be brought or instituted against the City, its elected officials, officers, agents and employees and the Consultant, against any such claim, demand or liability, and shall pay or satisfy any judgment that may be rendered against the City, its elected officials, officers, agents or employees, in any such action, suit or other proceedings as a result thereof.

5-15 NO PERSONAL LIABILITY. Neither the City Council, the Engineer, the Consultant, nor any other officer or authorized assistant or agent shall be personally responsible for any liability arising under the contract.

5-16 CONTRACTOR'S RESPONSIBILITY FOR WORK. Except as provided above, until the formal acceptance of the Work by the City, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause, wh ether arising from the execution or from the non- execution of the Work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof, except such injuries or damages occasioned by act of the federal government or the public enemy.

The City of Redlands shall not be held responsible for the care or protection of any material or parts of the work prior to final acceptance, except as expressly provided in these specifications.

The City shall not be responsible for security of the Contractors equipment or materials at the site.

The City will not be responsible for theft or damage to any property or materials of the Contractor.

Security for Contractor’s property shall be the responsibility of the Contractor.

5-17 WARRANTY OF WORK. The Contractor shall guarantee the Work against defective materials or workmanship for a period of (1) year from the date of completion date specified in the Notice of Completion, except where longer warranty periods are specifically stated. As specified in Section 2-4 in the GENERAL CONDITIONS, the Performance Bond shall remain in full force and effect during the warranty period.

GC 28

All work which has been rejected, shall be remedied, or removed and replaced, by the Contractor at his own expense, with work conforming to the Plans and Specifications. Any defective material or workmanship which may be discovered before final acceptance or within (1) one year from the completion date specified in the Notice of Completion shall be corrected immediately by the Contractor at his own expense notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor's ultimate responsibility to deliver at the time of final acceptance a complete project that complies in all details with these Contract Documents. All items shall be ready to operate.

Any omission or failure on the part of the Owner to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed an acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The Owner will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the Owner is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

During the (1) one year warranty period, should the Contractor fail to remedy defective material and/or workmanship, or to make replacements within five (5) days after written notice by the Owner, it is agreed that the Owner may make such repairs and replacement and the actual cost of the required labor and materials shall be chargeable to and payable by the Contractor or his Surety.

Nothing in this section shall be construed to limit the rights of the Owner to immediately correct conditions which may be unsafe or which may pose a public health nuisance. Should said conditions later be found to be caused by defective material and/or workmanship, the Contractor and his Surety shall reimburse the Owner for costs reasonably incurred while attending the situation.

In the event it is necessary for the Owner to file suit to enforce any liability of the Contractor pursuant to this sections WARRANTY OF WORK, the Owner shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees, including reasonable attorneys' fees, incurred by the Owner in successfully enforcing the Contractor's obligations, all to be taxed as costs and included in any judgment rendered.

The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the Contract Document or by law. The remedies provided herein shall not be exclusive and the Owner shall be entitled to any and all remedies provided by law.

5-18 NOTIFICATION OF RESIDENTS/BUSINESSES . The Contractor shall notify all residents, firms, institutions, agencies, and utility companies which may be affected by the work.

Notification shall be by hand delivery of an approved notice within the project limits approved by the City. The notification process shall consist of two notifications, one prior to the start of construction for all properties within the project area and a second notification at least seven days in advance of any activity which may impact each specific property. In the event of any work within the downtown

GC 29

area, the distribution of the second notification shall be at least fourteen days in advance of any activity. Activities impacting said properties and, therefore, requiring the above said notices include the following: the work itself; closure or partial closure of the street ; and disallowance of street parking and disallowance of vehicular ingress to or egress from the property.

Said firms, institutions, agencies, and utility companies which must be notified of proposed work shall include, but are not limited to the following: public schools, private schools, day care centers, postal service, hospitals, governmental services, p olice department, fire department, ambulance services, Omnitrans, solid waste collection, and City street sweeping.

The proposed notice shall be submitted to the Engineer at least seven calendar days prior to the date of distribution for review and approval. The submittal shall also include a map identifying the limits of the work and proposed limits of distribution. The printed notices shall contain a general description of the work to be done, the name of the street with limits, the day and date of the work and the name and telephone number of the Contractor. The notice shall also include a statement that there will be no disruption of trash collection schedules and that trash should be set out by 6:00 a.m. on the scheduled day of pickup. If on-street parking will be affected the notice shall include a statement that no on-street parking will be allowed between the hours of 7:00 a.m. and 5:00 p.m. on the day of work, and a statement that it will be necessary to tow away parked vehicles at the owner's expense per California Vehicle Code CVC 22651L and CVC 22654D.

The Contractor will provide City with the dates and addresses of when project notifications are delivered to affected properties. City will verify the notification process is completed in compliance with the requirements of the specifications. Work will commence when City approves Contractor’s compliance with the requirements set forth in the specifications.

If on-street parking is affected, the Contractor shall also post pre-approved "NO PARKING-TOW WAY" signs on 1 x 2 wood stakes or barricades at one hundred foot (100’) maximum spacing along the affected areas of the street, 48 hours prior to the start of the work. The "NO PARKING-TOW AWAY" signs shall contain the day, date, and hours that parking will be prohibited on that particular street and a statement that parked vehicles will be towed away at owner's exp ense per California Vehicle Code CVC 22651L and CVC 22654D. The Contractor shall maintain said signs throughout the day of work, and shall start the removal of said signs by 4:00 p.m. and complete the removal by 6:00 p.m. on said day of work or as otherwise directed by the Engineer.

The Contractor shall document the day, date, and time the signs are installed because the no parking restriction cannot be enforced until the signs have been in place 24 hours. Posting of signs on trees, utility poles, light standards and other existing parkway improvement is strictly forbidden.

In the event of street resurfacing operations, the notices to residents shall contain a statement that the street to be resurfaced will be closed to vehicular traffic, and the suggestion that if they require the use of their vehicles on the day of the resurfacing work, they should consider parking their vehicle on a nearby street which is not scheduled for a resurfacing application.

In the event scheduled work is delayed, the Contractor shall immediately remove all "NO PARKING" signs. The contractor must notify all previously notified, in person and with printed notices, that the

GC 30

work will be rescheduled and that they will be re-notified 48 hours in advance. The Contractor shall have an adequate supply of approved notifications for distribution to residents.

Full compensation for conforming to these requirements shall be considered as included in the various Contract items of work involved, and no additional compensation will be allowed therefore.

Failure to comply with this section shall result in a penalty assessment imposed of up to $10,000 per violation at the City’s discretion.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK . - Add the following paragraph:

Contractor shall notify Underground Service Alert (USA) at 1 (800) 227-2600, two working days prior to starting work, and must submit verification number to the City prior to starting work.

6-1.2 Commencement of the Work. - Amend the second sentence as follows:
“The work shall start within 10 days thereafter, and be diligently prosecuted to completion within the Contract Time.”

6-3 TIME OF COMPLETION.

6-4.1 General. - Add the following paragraphs:

If saturated soil is encountered during construction due to leaks in an existing utility, contractor shall remove saturated material and replace with a suitable backfill material until adequate compaction can be attained by verification from the City's Geotechnical Engineer.

Prior to any removal of saturated material, contractor shall discuss the methods of remediation with the City's representative. Approval from the City, or the City's representative, shall be obtained for any amount of saturated material removal in which the contractor anticipates to be compensated for, if approval is not obtained all costs shall be borne by the contractor.

Up to a 14 day delay in paving operations may be requested after all leaks have been resolved to provide time for excess moisture to dissipate, at no additional cost to the city, in lieu of removing and replacing the saturated soil. A no cost change order will be prepared to provide the contractor with additional contract time if such delay is requested by the City.

6-9 LIQUIDATED DAMAGES. The value of liquidated damages noted in this section is amended to five hundred dollars ($500) per working day.

6-10 NOTICE AND SERVICE THEREOF. Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:

GC 31

Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the project site, or by deposing the same in the United States Mail enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of work under this Contract, certified and with postage prepaid.

Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated by him to the party giving the notice, certified and with postage prepaid.

Notice shall be given to the Owner by personal delivery thereof or by depositing the same in the United States Mail enclosed in a sealed envelope, certified and with postage prepaid. The address of record for the owner is:

City of Redlands
Municipal Utilities & Engineering Department
P.O. Box 3005
35 Cajon Street, Suite 15A
Redlands, CA 92373

6-11 PUBLIC RECORDS ACT . All documents, Plans, specifications and all other information relating to the conduct of the City’s business, including information submitted by the Contractor, shall become the exclusive property of the City and except as provided by law shall be deemed publ ic records. Said information shall be subject to the provisions of the California Public Records Act (Government Code Sections 6250 et seq.).

Under no circumstances will the City be responsible or liable to the Contractor, submitter or any other party for the disclosure of any records or information submitted to the City, regardless of whether such records or information are labeled “Trade Secret”, “Confidential”, or “Proprietary” (or words to similar effect) and regardless of whether the disclosure is required by law or a court order or occurs through inadvertence, mistake, or negligence on the part of the City or its officers, employees, and/or Contractors.

The City will not advise as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definition of “Trade Secret”. The submitting party shall be solely responsible for all determinations made under the Act, and where appropriate for clearly and prominently marking each and every page or sheet of information with “Trade Secret”, “Confidential”, or “Proprietary”. Each submitting party is advised to contact its own legal counsel concerning the California Public Records Act and its applicability to the submitting party’s own circumstances.

In the event of litigation concerning the disclosure of any information submitted by the submitting party, the City’s sole involvement will be as a stakeholder, retaining the information until otherwise ordered by a court. The submitting party, at its sole expense and risk, shall be responsible for any and all fees and costs for prosecuting or defending any action concerning the information, and shall

GC 32

indemnify and hold the City harmless from all costs and expenses including attorneys’ fees, in connection with such action.

SECTION 7 - MEASUREMENT AND PAYMENT

7-3 PAYMENT.

7-3.2 Partial and Final Payment. - Delete and replace with the following:

The closure date for the purpose of making monthly progress payments shall be assigned by the Engineer during the pre -construction meeting. Payment, less deductions, unearned work and retention, will be made within 30 days of the closure date. If a dispute exists between the City and the Contractor regarding an item included in the Contractor's Monthly Progress Payment Request, progress payments will be withheld until said dispute is resolved, in which case longer period of time will be required to make such payment. No such payment shall be required to be made, when in the judgment of the Engineer, the total value of the work since the last estimate amounts to less than $500.

If, in the opinion of the Engineer, work is not progressing according to the approved schedule, payments may be withheld until the Contractor returns to the approved schedule.

Deductions will be made for: (1) amounts due the Owner for equipment or material furnished or services rendered; (2) amounts due the Owner under the terms of the Contract; (3) amounts of any claims of lien filed with the Owner; (4) accrued amounts of liquidated damages; (5) amounts required to be deducted by Federal, State or local governmental authorities. From the balance thus determined will be deducted the amounts of all previous payments, and the remainder shall constitute the monthly payment due the Contractor.

A retention of five percent (5%) will be withheld from each and every progress payment to the Contractor. This percentage will remain constant throughout the duration of the Contract. The City shall make a progress payment within thirty (30) days after r eceipt of an undisputed and properly submitted payment request from Contractor pursuant to Public Contract Code section 20104.50.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

As provided by paragraph 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the City to ensure performance under the Contract.

Substitute securities shall be deposited in a financial institution in a form acceptable to the City of Redlands. The financial institution shall be located within the City limits of the City of Redlands.

The Escrow Agreement to be used is set forth in Public Contract Code section 22300.

7-3.3 Delivered Materials. - Delete and replace with the following:

No payment will be made for materials or equipment delivered but not yet incorporated in the work.

GC 33

7-4.2.6 Extras. Without invalidating the Contract, the City may order extra work or make changes by altering, adding or deducting from the work, the Contract sum being adjusted accordingly and the consent of the Surety being first obtained where necessary or desirable. All the Work of the kind bid upon shall be paid for at the price stipulated on the proposal, and no claims for any extra work or material shall be allowed unless the work is ordered in writing by the engineer and the price is stated in such order.

7-4.2.7 Claims for Extra Costs. No claim for extra work or cost shall be allowed unless the same was done in pursuance of a written order by the Engineer, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of the General Conditions, the Contractor shall furnish satisfactory bills, payrolls, and vouchers covering all items of cost and when requested by the City, give the City access to accounts relating thereto.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of the thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

SECTION 8 - FACILITIES FOR AGENCY PERSONNEL

This section is deleted in its entirety.

SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES
CLAIMS

9-1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the City all rights, title and interest and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with section 16700 of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this public works agreement. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the Parties.

SECTION 10 - TRENCHING AND EXCAVATION

10-1. If this contract involves digging trenches or other excavations that extend deeper than (4) feet below the surface, the following shall be done pursuant to California Public Contract Code Section 7104:

A. That the Contractor shall promptly and before the following conditions are disturbed, notify the City in writing, of any:

GC 34

(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law.

(2) Subsurface or latent physical conditions differing from those indicated.

(3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

B. That the City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor’s cost of, or the time required for, performance of any part of work shall issue a change order under the procedures described in the contract.

C. That, in the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contrac t or by law which pertains to the resolution of disputes and protests between the contracting parties.

SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF

EXISTING UTILITIES

11-1. Pursuant to Government Code Section 4215 et seq, the City shall assume the responsibility between the parties to this contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of the construction project for this contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids.

11-2. The Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not identified in the plans and specifications with reasonable accuracy and for equipment on the project necessarily identified during such work.

11-3. The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the City, or the owner of the utility to provide for removal or relocation of such utility facilities.

11.4. The City shall not be required to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the construction project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on adjacent to the site of construction, provided, however, nothing herein shall relieve the City from identifying main or trunk lines in the plans and specifications.

GC 35

11.5. Nothing herein shall preclude the City from pursuing appropriate remedy against the utility for delays which are the responsibility of the utility.

11.6. If the Contractor, while performing the contract, discovers utility facilities not identified by the City in the contract plans or specifications, Contractor shall immediately notify the City and the utility in writing.

11.7. The public utility, when it is the owner, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price.

11.8. Contractor shall comply with Government Code Section 4216 through 4216.9.

11.9. Conduits from existing street light and traffic signal systems may be encountered during construction of this project. All removals, relocations, and/or replacements of existing conduit systems shall be performed in accordance with these specifications and City standards, by a qualified electrical contractor. All costs for said work shall be borne by the Contractor and paid as a part of the various items of work requiring such removals, reloca tions, and/or replacements, and no other compensation shall be made therefore.

SECTION 200 - ROCK MATERIALS

200-2 UNTREATED BASE MATERIALS.

200-2.1 General. - Amend the first paragraph as follows:
“Materials for use as untreated base or subbase shall be classified in the order of preference as follows:

Crushed Aggregate Base
Crushed Miscellaneous Base
Pulverized Miscellaneous Base.”

200-2.4.1 General. - Delete the second sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.”

200-2.4.2 Grading. - Amend the first sentence of paragraph 1 as follows:
“The material shall be uniformly graded and shall conform to the ‘fine’ gradations:”

200-2.5.1 General. - Delete the third sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.”

200-2.8.1 General. - Amend as follows:

Delete the second sentence of paragraph 1 and replace with the following:
“Pulverized miscellaneous base may contain underlying base material.”

Delete the third sentence of paragraph 1 and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.”

GC 36

SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS

201-1 PORTLAND CEMENT CONCRETE.

201-1.1.1 General - Add the following paragraph:

The Contractor shall furnish the Engineer in the field with a copy of the mix design to be used, and with a legible certified weighmaster's certificate for each load of PCC delivered to the project.

PCC delivered to the project site having a water content and/or slump greater than that specified in the mix design, shall be rejected and removed from the project site.

201-1.1.2 Concrete Specified by Class and Alternate Class - Amend Table 201- 1.1.2.(A) as follows:

Street Surface Improvements section -
All concrete in this section shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330- C-23 (560-C-3250) concrete.

Sewer & Storm Drain Facilities section, Sidehill Surface Drainage Facilities subsection - All concrete in this subsection shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330 -C-23 (560-C-3250) concrete.

201-1.4.3 Transit Mixers. - Replace the first sentence in paragraph 6 with the following:

The total elapsed time between addition of water at the batch plant and the completion of the discharge of the PCC from the mixer, shall not exceed ninety (90) minutes. All PCC remaining in the mixer, after said ninety (90) minutes time limit, shall be rejected and removed from the project site.

SECTION 203 - BITUMINOUS MATERIALS

203-3 EMULSIFIED ASPHALT.

203-3.1 General. - Modify the section by adding the following:

Asphalt emulsion shall be a QUICKSET ANIONIC OR CATIONIC EMULSIFIED ASPHALT conforming to the requirements of Subsection 203- 1.3, “Test Reports and Certification”, and Subsection 203-1.2, “Testing Requirements” of the Standard Specifications.

The latex additive shall be Ultra Pave 70 (for anionic) or Ultra Pave 65 K (for cationic) or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water. The latex shall be added at a rate of two to two-and-one-half (2 to 225) parts to one-hundred (100) parts of emulsion by volume.

203-5 SLURRY SEAL.

GC 37

203-5.1 General. - Delete the sentence and replace with the following:

Slurry seal shall be emulsion-aggregate slurry (EAS) conforming to 203-5.4.

203-5.2 Mix Design. - Modify the section by adding the following:

(f) Admixtures, such as Portland Cement or aluminum sulfate may be mixed into the slurry material to adjust curing time such that the applied slurry can support vehicular traffic within 60 minutes.

(g) Use of slag shall not be permitted.

(h) Deliveries of aggregate and emulsion shall not be made without the engineer present.

Emulsion is not to be transferred to an on -site storage tanker without the sieve test performed by the City.
203-5.3.2 Grading. - Delete the sentence and replace with the following:

The combined aggregate gradation shall be determined in accordance with ASTM C136 and conform to Type II requirements shown in Table 203-5.3.2 (A).

203-5.4.1 General. – Modify the paragraph and replace with the following:

EAS shall be a stable mixture of emulsified asphalt, aggregate, water, a set control agent, and latex.

EAS shall be Type II-CQS-1h-EAS.

203-5.4.2.1 Aggregate. – Delete the sentence and replace with the following:

Aggregate shall be Type II conforming to 203-5.3.

203-5.4.2.2 Emulsified Asphalt. – Modify the first paragraph and replace with the following:

Emulsified asphalt shall be quick -set, and contain latex. Quick- set emulsified asphalt shall be CQS-1h conforming to 203-3.

203-6 ASPHALT CONCRETE.

203-6.1 General. - Add the following paragraph:

Unless otherwise approved by the Engineer, asphalt concrete for paving shall be C2- PG 64-10 (1/2”) for finish paving or B -PG 64-10 (3/4”) for base paving. A sphalt concrete for Type D1 or Type D2 curb shall be D2 –PG 70-10.

SECTION 206 - MISCELLANEOUS METAL ITEMS

206-7 TRAFFIC SIGNS.

206-7.1 General. The Contractor shall furnish or relocate and erect all traffic signage as required and specified.

GC 38

All new traffic signage shall be a minimum of the encapsulated lens (high intensity) type, have an anti-graffiti protective covering and be installed on new posts. All traffic signage to be relocated shall be installed on new posts.

206-7.2 Protective Covering. Anti-graffiti protective covering shall be Type 1150- POF, manufactured by 3M Company, or approved equal.

206-7.3 Post and Base. New posts and bases shall be Ultimate Sign Support System as manufactured by Western Highway, or approved equal.

SECTION 207 – GRAVITY PIPE

207-2 REINFORCED CONCRETE PIPE (RCP).

207-2.1 General. - Add the following sentences to paragraph 2:

The minimum D-load for any RCP shall be 1,350. The minimum size for RCP shall be 18 inches (457 mm) unless otherwise approved by the Engineer.

SECTION 211 - MATERIAL TESTS

211-1 COMPACTION TESTS.

211-1.4 General. The Contractor shall be responsible for all quality control for all work. The Contractor shall complete all necessary testing to ensure the quality requirements within the specifications are achieved. The Contractor shall conduct the compaction testing by a geotechnical engineering firm and the results of the testing shall be made available to the Engineer.

The City will complete assurance testing throughout the project by an independent testing firm.

The City will perform the first compaction test required at any location. If such test does not meet the required specifications, the City will make additiona l tests until the required compaction is obtained and withhold from the final payment due the Contractor, the cost of all such additional tests. To be acceptable, tests must be ordered and witnessed by the City. Tests will be ordered by the City and performed at a location and depth as directed by the City. The Contractor shall assist the City in performing these tests as necessary. The Contractor shall provide to the City the maximum dry density and the optimum moisture content results of backfill and bedding material when requested by the City.

SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS

214-4 PAINT FOR STRIPING AND MARKINGS.

214-4.1 General. - Amend the first sentence in paragraph 4 as follows:
“Glass beads conforming to 214-3 shall be mechanically applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”

GC 39

SECTION 300 - EARTHWORK

300-1 CLEARING AND GRUBBING.

300-1.1 General. - Amend as follows:

Amend paragraph 3 as follows:
“The natural ground surface shall be cleared of all vegetable growth, such as trees, logs, upturned stumps, roots of downed trees, brush, grass, weeds, shrubs, ground cover, tree stumps, decorative landscape rocks, edging, railroad ties, other decorative landscape treatments, boulders, rock, portland cement concrete, and all other objectionable materials, within the limits of construction.”

Add the following paragraphs:

Grubbing and removal of organic debris shall include the repair and/or replacement of all parkway irrigation piping and systems necessary to perform work on this Contract and capping pipelines until such time that permanent repairs and/or replacements have been made.

All debris removed from the project site under this item shall be disposed of at an approved dump site. All transportation costs and dump fees shall be borne by the Contractor.

Clearing and Grubbing shall include, but is not limited to, the following:

1. Removal of existing AC berms.

2. Removal of all curb and gutter, cross gutters, and spandrels shall be replaced within three (3) calendar days. The Asphalt Concrete patch for areas with curbs and gutters removed and replaced shall be placed within two (2) working days after the curb a nd gutter, cross gutters, and spandrels are replaced. Removal of all sidewalks shall be replaced within three (3) calendar days.

3. Saw cut and removal of poles, posts, PCC pavements, curb, gutter, and sidewalk. Holes resulting from removal of existing poles and posts from existing PCC, AC pavements and curbs and gutters, shall be filled or patched with like materials. Self -propelled drop hammers will not be allowed for removals.

4. Removal of all raised pavement markers not conforming to the approved plan or conflicting with the proposed striping as shown on the plans in accordance with Subsection 312- 3, Removal, of the Standard Specifications.

5. Removal and disposal of boulders, rock or PCC.

6. All trees and shrubs less than 3m ( 9 ft) directly above the entire sidewalk surface shall be trimmed and removed by the contractor to allow a clear path of travel for pedestrians.

7. Irrigation system relocation:

GC 40

Any irrigation systems in conflict with the proposed improvements that are removed, damaged, disturbed, or broken shall be modified, repaired, and/or replaced to be operable and provide full irrigation coverage to the areas requiring irrigation using new m aterials, equal or better than the original materials, with 20 mm (3/4 in) Schedule 40 PVC being the minimum acceptable for underground lines and 13 mm (1/2 in) Schedule 80 being minimum acceptable for risers and with the systems not being out of operation for more than two (2) days. No payment for work associated with the irrigation repair will be released, until all irrigation is complete, operable and accepted by the City.

All trees, shrubbery and lawns deprived of normal irrigation watering due to a disruption of service caused by the Contractor’s operations shall be regularly and thoroughly irrigated by the Contractor so that said plantings will not be damaged. If any tre es, shrubbery or lawns die or suffer unacceptable damage as a result of or precipitated by the Contractor’s operations the Contractor shall replace same with the same plant species and size. Existing grass lawns within areas that must be excavated and/or re-graded shall be cut into approximate 305 mm (1 ft) squares, removed, protected, cared for and replaced as soon as possible. Dead, dying, and unacceptably damaged grass shall be replaced with new grass sod.

8. Existing inlets, slotted drains, drainage pipes, concrete gutters, drainage pipes, where any portion of such structure is within 1m of the grading plane in the excavation areas, or within 300 mm (1 ft) of original ground in embankment areas, or where shown on the plans to be removed, shall be completely removed and disposed of accordingly.

9. Removal and disposal of existing drainage inlet structure and PCC or AC apron.

10. The Contractor shall dispose all materials not being salvaged outside of the right -of-way and shall pay for all costs for disposal.

11.Removal and disposal of any abandoned utilities that may interfere with the improvements.

12.Self-propelled drop hammers will not be allowed for removals.

300-1.3.1 General. - Add the following paragraphs:

The Contractor shall dispose portland cement concrete, stone rubble, and brick at an approved dump site.

All reprocessed asphaltic cement concrete may be placed as the lower course of crushed aggregate base material. If the Contractor chooses not to reprocess the material, disposal at an approved dump site shall be required. All costs for disposal shall be borne by the Contractor. If the Contractor chooses to reprocess material, it shall be protected and remain contaminate -free, otherwise disposal at an approved dump site will be required with all costs borne by the Contractor.

All reprocessed asphaltic cement concrete to be used as crushed aggregate base shall be ground to conform to Section 200-2.2.

GC 41

300-1.3.2 (a) Bituminous Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cutting of edges to be joined shall be with a power-driven saw. The groove shall be cut to a minimum depth of 4 inches (102 mm).”

Amend the third sentence as follows:
“Where bituminous pavement is to be removed, a cold mill header cut of maximum 6 feet (1.8 m) in width perpendicular to the join line shall be made, and a minimum laying depth of 1 inch (25mm) of new pavement material shall be provided at the join line.”

Amend the fourth sentence as follows:
“The edges of existing concrete pavement adjacent to the trench shall be saw cut to neat straight lines for the purpose of removing the damaged pavement areas.”

Add the following sentence:

Work under this item shall include asphalt concrete berms.

300-1.3.2 (b) Concrete Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cuts shall be made to a minimum depth of 4 inches (102 mm).”

Amend the third sentence as follows:
“If a saw cut in concrete pavement falls within 5 feet (1.5 m) of a construction joint, cold joint, expansion joint, or edge, the concrete shall be removed to the joint or edge.”

300-1.3.2 (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways and Alley Intersections. - Amend the following:

Amend the first sentence as follows:
“Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 4 inches (102 mm).”

Amend the third sentence as follows:
“No section to be replaced shall be smaller than 36 inches (1 m) in either length or width.”

Amend the fourth sentence as follows:
“If the saw cut in sidewalk or driveway would fall within 36 inches (914 mm) of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within 12 inches (300mm) of a score mark, the saw cut shall be made in and along the score mark.”

Amend the fifth sentence as follows:
“curb and gutter shall be sawed to a depth of 4 inches (102 mm) on a neat line at right angles to the curb face.”

GC 42

300-1.3.2 (d) Striping and Markings. All existing striping, markings and raised pavement markers shown to be removed or necessary to be removed from paving areas. This item includes removal in compliance with applicable laws and cleanup of residue from the operation.

All striping, markings and raised pavement markers removed beyond the limits shown on the plans for and/or at the convenience of the Contractor shall be replaced at the Contractor’s expense.

300-1.3.2 (e) Structures. All existing concrete structures (reinforced or non- reinforced) as shown on the plans to be removed or abandoned, including but not limited to, undersidewalk drains, manholes, headwalls, bulkheads, drop inlet structures, energy dissipaters, catch basins, vaults and pipelines. Abandonment shall include all cuts and concrete plugs necessary to seal ends or openings of abandoned pipes or structures.

300-1.3.2 (f) Rock Curbs. All rock from rock curb removals, as shown on the plans or required for construction of the project, shall be transported, delivered and unloaded at a storage site as directed by the Engineer.

300-1.3.2 (g) Miscellaneous Removals. All other removals of facilities, as shown on the plans but not covered under separate bid items, and any underground facilities found during the work and not shown on the plans shall be performed. The City has endeavored to show all known underground f acilities but is not responsible for unknown or abandoned facilities. Unknown underground facilities shall be paid as extra work.

300-1.3.2 (h) Miscellaneous Relocations. All relocation work as shown on the plans or required for construction of the project, but not covered under separate bid items, shall be included as a part of Subsection 300-1 Clearing and Grubbing. All relocation work performed as a part of clearing and grubbing work shall conform to the requirements and specifications of the agency or utility having jurisdiction over the item to be relocated.

300-1.4 Payment. - Add the following sentence to paragraph 1:

Payment for work on this item shall be made as a percentage of the work completed at each monthly payment.

300-2 UNCLASSIFIED EXCAVATION.

300-2.2.2 Wet Material. - Amend the second sentence of the paragraph:
“If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the contract, the work involved will be paid for in the following manner: Over-excavation and disposal work shall be considered “extra work,” with backfill and compaction of crushed aggregate base paid under the appropriate bid item in these specifications.”

300-12 MISCELLAENOUS GRADING. The parkway, whether landscaping exists or not, shall be graded and compacted to achieve drainage towards the street at a slope of 2% . Grading shall be coordinated such that it is the last item of work to be completed, prior to site clean -up. Loose material and dirt shall be raked , compacted and distributed throughout the parkway area. Areas

GC 43

adjacent to installed improvements must be graded to a level within one inch from the finished surface. Extra dirt/fill shall be removed from the project in accordance with Specifications.

The Contractor, at his expense shall photo-document pre-construction conditions prior to starting excavating. After construction is completed, the Contractor shall photo -document the finished grade. The Contractor shall provide the City with said photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc). The Contractor shall keep a copy of the photos (either electronically or hard copy) and provide the City with electronic copies of the photos.

SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND

PLACEMENT OF BASE MATERIALS

301-1 SUBGRADE PREPARATION.

301-1.3 Relative Compaction. - Amend the second sentence of paragraph 1 as follows:
“When base material, curb, gutter, alley pavement, driveways, or sidewalks are to be placed on the subgrade material, the top 6 inches (150mm) of such subgrade material shall be compacted to a relative compaction of 95 percent.”

301-2.1 General. – Add the following paragraphs:

The contractor shall use ‘crushed aggregate base’ or ‘crushed miscellaneous base, fine graded’ as the base material. The use of ‘processed miscellaneous base,’ ‘select subbase,’ or ‘disintegrated granite’ shall not be used as base material.

The contractor may use ‘pulverized miscellaneous base’ (grindings) as part of the crushed base material. Said grindings shall be uncontaminated and placed in an even thickness as the lower course of crushed base material. Spreading and compacting shall comply with Sections 301- 2.2 and 301-2.3.

301-2.3 Compacting. – Amend the second sentence of paragraph 3 as follows:
“Compaction in the excepted areas shall be as specified in 211 -1 with each layer of compacted base material having a minimum relative compaction of 95 percent.”

301-2.4 Measurement and Payment. – Add the following paragraph:

Payment shall be made for cold -planing, storing, placing, and compacting reprocessed asphalt concrete pavement (grindings) as part of the crushed aggregate base (CAB) material. The volume of grindings placed shall be figured and a tonnage figure computed using 9.35 kg/m^3 (150 pounds per cubic foot). This tonnage figure shall be paid as par t of the crushed aggregate base tonnage for this project.

301-7 FULL DEPTH RECLAMATION WITH MECHANICAL STABILIZATION (FDR- 25)

301-7.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per

GC 44

plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 25 ksi.

The manufacture of the recycled base course shall be done in -place by pulverizing and blending the existing AC layer and base materials, if present. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

301-7.2 Construction . The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two- inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of roots, weeds, wood, and construction debris. All grass and other vegetation shall be removed from the edge of the exiting pavement or lip of gutter pan to prevent contamination of the pulverized bituminous material during the milling operation.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulveri zed pavement section to the lines and grades matching existing and/or per plans and specifications.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.

301-7.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout

Final subgrade surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized asphalt material must be used as base material to meet new cross slope requirements.

Native sub-grade material may need to be hauled off to allow for the use of all pulverized base material. No additional compensation will be allowed for any sub -grade removal and haul -off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of mater ial, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

GC 45

301-7.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture prior to shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer . The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

According to the Section 301- 2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

301-7.5 Finishing. The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12- foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

301-8 FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION (FDR-200)

301-8.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 200 ksi.

The manufacture of the recycled base course shall be done in -place by pulverizing and blending the existing AC layer and base materials, if present , and adding cement . Micro-cracking of the completed cement stabilized surface is required before HMA is to be placed directly on top of the cement treated surface, regardless of the AC thickness. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

The cement content must be 2% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 6” FDR section. The cement content must be 3% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 9” FDR section. The cement content must be 4% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 12” FDR section. Cement must be Type II or Type V Portland cement specified in ASTM C 150/150M.

301-8.2 Construction . The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two- inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt

GC 46

concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of grass and vegetation, and construction debris to prevent contamination of the pulverized materials. Mixing shall continue until, and at the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials are achieved.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulveri zed pavement section to the lines and grades matching existing and/or per plans and specifications. Excess pulverized material shall consist of non-treated well mixed pulverized AC pavement and subgrade.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.

301-8.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout

Final pavement surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized material must be used as base material to meet new cross slope requirements. Native sub-grade material may need to be hauled off to allow for the use of all the pulverized base material. No additional compensation will be allowed for any sub -grade removal and haul -off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

301-8.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. R emove any visible oversized materials in the pulverized roadbed mixture before shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

Recycling shall be performed to the depth provided in the plans, while incorporating stabilizing agents, mineral filler, additional aggregate and water. Mixing shall continue until, and the speed

GC 47

of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials is achieved. Pre- cutting, grading and light compacting of the recycled material shall be performed prior to incorporation of the stabilizing. Spread cement uniformly over the full roadway surface width. Do not spread cement more than 30 minutes before mixing. Do not apply dry cement in windy conditions that will result in dust outside the FDR with cement area. The application rate must be the mix design rate or the ordered application rate in lb/sq yd ±

0.5 percent. The application rate of all stabilizing agents shall be continuously monitored. If the measured application rate falls outside the above tolerance, then the recycling operations shall be stopped and corrected before proceeding. Do not spread cement and aggregate before pulverizing.

Water must be injected through the pulverizing machine. The injection rate of mixing water must be sufficient to produce the FDR with cement material mixing moisture content. The water content of the stabilized material shall be monitored closely to ensure proper compaction. Mark where the center of the pulverizing drum stops. Start the following cut on this alignment at least 2 feet behind the mark. Before compacting, remove solids larger than 3 inches in any dimension by hand.

Immediately after pulverizing and mixing, compact FDR with cement to the minimum relative compaction. Do not allow more than 2 hours between final mixing of the pulverized material with cement and completion of initial compaction before trimming . During grading and final compaction add water to maintain the mixing moisture content as described in the mix design. Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to completion of final compaction after trimming.

Longitudinal joints between adjacent stabilization passes shall be overlapped at least 4 inches.

Transverse joints between the recycling process shall be saw-cut, if necessary, to provide a vertical clean face to ensure proper compaction. Compaction of cem entitious stabilizer begins within 20 minutes after mixing and achieving gradation and moisture requirements.

According to the Section 301- 2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

Construction joints shall have vertical faces and shall be made in thoroughly compacted material.

Additional mixture shall not be placed against the construction joint until the joint has been approved by the Engineer. The face of the cut joint shall be lean and free of deleterious material and shall be kept moist until the placing of the adjacent FDR with cement.

301-8.5 Finishing. Once the entire working width (full lane width plus effected shoulder width) has been stabilized, and only after primary compaction has been completed, the entire working

GC 48

width shall be graded to the required profile and cross -slope. Disturbance to the stabilized and primary compacted material shall be kept to a minimum during this grading and shaping operation.

The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

Immediately after compaction, apply water and roll with no vibration. The finished surface must be free of ruts, bump, indentations, segregation, raveling, and any loose material.

The completed cement treated subgrade shall be moist cured continuously until it is in a firm and unyielding condition. The cement treated subgrade shall be kept free from heavy traffic during the curing period or until the asphalt concrete surfacing is pl aced whichever is less, unless otherwise directed by the Engineer. Moisture curing shall be the only method of curing prior to micro- cracking.

Micro-cracking shall be performed with several vibratory roller passes 48 to 72 hours after finish grading to prevent severe, wide cracks from forming thus reduces the potential for reflective cracking through the HMA layer. Micro -cracking shall be perform ed before the application of asphaltic emulsion curing seal. After micro -cracking is complete additional moisture curing may be used. Any additional water required to achieve maximum density shall be applied by spraying the surface of the stabilized material with light applications. Care shall be taken so as not to over- apply additional water to any areas of the stabilized material.

While open to traffic and before placing HMA, maintain the FDR with cement surface free of ruts, bumps, indentations, raveling, and segregation. If FDR with cement material is damaged, it shall be repaired by removing and replacing the entire depth of aff ected layers in the damaged area.

Feathering will not be permitted for repair of low areas.

Asphaltic emulsion curing seal must be applied on the completed cement treated base immediately before placing HMA. Asphaltic emulsion curing seal must comply with Caltrans Standard Section 94, Grade SS1 or CSS1. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must no cause premature separation of the emulsion. Uniformly apply the diluted curing seal at a rate of 0.1 gal/yd2 of cement treated base surface.

SECTION 302 - ROADWAY SURFACING

302-4 SLURRY SEAL SURFACING.

302-4.3.1 General. – Add the following paragraphs:

All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.

GC 49

Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.

The Contractor shall provide a drive upon scale at the project site or an alternate site approved by the City. The drive on scale shall show the net weight of the aggregate bin on each slurry machine before the machine and product will be approved for applying slurry on the project.

All slurry machines are to carry, at all times, a calibrated emulsion measuring stick. The emulsion measuring stick is to be calibrated in 10- gallon increments to the slurry machine it is used on.

Emulsion measuring sticks from other slurry machines will not be allowed to measure the gallons of emulsions on the slurry machines they were not calibrated to. The emulsion measuring stick is to have the slurry machine number or identification permanently marked on the stick. The gallons of emulsion are to be measured with a calibrated emulsion measuring stick and recorded before leaving and after returning to materials site. Use of a slurry machine will not be allowed if it does not have a calibrated emulsion measuring stick.

The Contractor shall furnish prior commencing work, a calibrated stick in 10-gallon increments to measure the oil in the trailer storage tanks in gallons. The measuring stick shall be calibrated to the trailer storage tank it is used on. The inspector shall check the oil in each load “in and out” and in the storage tanks at the beginning and end of each day to determine the amount of emulsion used for that day. Emulsion is not to be transferred from delivery tank to on- site storage tank before the City performs the sieve analysis on the emulsion. Aggregate used in the slurry shall not exceed a moisture content of four percent (4%) by weight of dry aggregate.

Contractor may not schedule more than 150 tons of slurry to be placed per day. Slurry may not be applied at more than 150 feet per minute.

The Contractor shall provide a self-propelled 10 ton pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system. The Contractor shall roll the required streets the same day they are slurried. The Contractor will be responsible for proper scheduling of the work s uch that the rolling can be properly done within the given time constraint. Failure to comply shall result in a $250.00/calendar day liquidated damage being assessed per incident. The cost of furnishing the roller and operator shall be included in the price paid for slurry seal.

The Contractor is hereby advised that City streets, parking lots, or other City- approved property will not be allowed as a site for stockpiling and batching. Arrangements for an acceptable site shall be the sole responsibility of the Contractor.

The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and reslurried with a Type I mixtures (Local Streets) or a Type II (Arterial/Collector Streets) at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.

The Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least fourteen (14) calendar days prior to slurr ying. The herbicide mixture

GC 50

shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to slurrying. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for slurry seal.

Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if they do not adversely affect the slurry seal. Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3 inches. Use a material, such as building paper at transverse joints and over previously placed slurry seal to prevent double placement.

Remove the material after use. Use hand tools to remove spillage.

Full compensation for developing a water supply, for furnishing and placing all water required for work done in the Contract, including extra work shall be included in the prices paid for the various items of work requiring water; and no separate payment w ill be made therefore. The Contractor shall supply the City with licensed weighmaster’s certificates of weight for all delivered aggregates to the job during the course of each day. Aggregate shall be delivered to the project only in the presence of a City representative. The Contractor shall also present weighmaster certificates for the amount of such aggregate remaining at the completion of the project at no cost to the City.

Payment shall be determined by the amount that is physically placed, which c annot exceed the amount that is delivered to the job site with the certified weighmaster tickets. There shall be not outside work done utilizing materials from the tanks or stockpiles stored for the City’s Contract.

Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.

Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.

The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.

The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately com ply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer.

302-4.8 Spreading and Application. - Add the following paragraphs:

Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the street surface with a power sweeper, remove all R.P.M.’s, abrasive grind or sandblast completely all lane lines, street legends, crosswalks or other painted or thermoplastic surfaces. This is necessary to provide a good bonding surface for the slurry seal, as well as eliminate “ghosting” of the old striping and markings as the new slurry wears off over time.

GC 51

It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at their own expense, to provide for and protect the work from such water. In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.

Slurry shall not be applied when the atmospheric temperature is less than 65 oF (18oC).

The application of slurry shall not commence until after 8:00 a.m., and shall conclude at 1:30 p.m. unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The portions of streets to be slurried shall be closed from the time the application begins until the mixture as achieved sufficient set to be opened to traffic.

The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.

The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.

Each slurry crew shall be composed, at a minimum, of a coordinator at the project site at all times, a competent quick-set mixing man, a competent driver, two squeegee men, and sufficient laborers for any handiwork and cleanup.

Surface oil and grease shall be removed or sealed with shellac or an equivalent material approved by the City before the application of the slurry seal. Full compensation for surface oil and grease removal shall be considered as included in the unit cost for slurry seal.

The Contractor shall roll all cul-de-sacs (the last 250’ minimum), the last 250’ of dead-end streets and knuckle curves. Full compensation for rolling the slurry shall be considered as include in the unit cost for slurry seal.

During slurry seal operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, pavement markers (reflective and non -reflective), concrete gutters, concret e cross gutters, and drainage facilities, survey monuments and remove said covering and/for slurry seal coating after slurry sealing has been completed.

The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After applicati on of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day.

GC 52

302-4.8.1 Crack Sealing and Filling. Crack sealing shall be performed prior to the Slurry Seal application. Pavement cracks 1/4" wide and larger shall be sealed. Pavement cracks 1/8" to 1" wide shall be cleared of all loose particles of dust, dirt and laitance with oil- free compressed air immediately preceding the sealing operation. Cracks shall be routed out as necessary to provide a reservoir for the sealer that will have a depth of l" to 1 1/2".

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203 -6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

302-5 ASPHALT CONCRETE PAVEMENT.

302-5.1 General. - Add the following paragraphs:

Asphalt concrete pavement structural sections equal to or greater than 3 inches (76 mm) in thickness shall be installed in two lifts. Base course aggregate material size shall be ¾ inch (19 mm) and cap course aggregate material size shall be ½ inch (13 mm). All pavement shall be placed over 4 inches of crushed aggregate base, unless compacted to 95% relative compaction.

All valves within project limits in the public right -of-way shall be raised to finish grade as a part of this work. The Contractor shall furnish and install new can or slip can materials as necessary.

If new water valve lids are necessary, they shall be supplied by the Municipal Utilities and Engineering Department. All valve can lids within the project limits in the public right- of-way shall be painted the appropriate color for the utility they represent (ie. Water - Blue, Gas - Yellow, Fire – Red, etc.).

302-5.2 Timeline of Paving Operations.

All paving operations shall follow the timeline and requirements shown below unless otherwise approved by the City:

GC 53

PAVING TIMELINE

DESCRIPTION OF WORK

TIME PERIOD
WEEK 1
(DAY 1-7)
WEEK 2
(DAY 8-14)
WEEK 3
(DAY 15-21)
WEEK 4
(DAY 22-28)
PAVING (START TO FINISH) (1)
CURE PERIOD (2)
MANHOLE ADJUST TO GRADE (3)
STRIPING & PAVEMENT MARKINGS (4)
TRAFFIC LOOPS (5)
NO PARKING SIGNS ALLOWED (6)
Note: All time periods shown above are the maximum amount of allowable time for each activity.

This timeline does not apply to the installation or repair of curb and gutter, ac dikes, sidewalks, cross gutters, curb ramps, driveway approaches or truncated domes.

(1) In no case shall any street segment remain unpaved longer than three calendar days if no other work activity is being performed on that street segment. Any deviation from the timeline shall result in a penalty assessment of $1,000 per calendar day. (2) No work except cat tracking of proposed striping is allowed during this period; therefore “No Parking Signs” shall not be installed during this activity. (3) Once each manhole is exposed, all associated work to adjust it to grade must be completed within 48 hours. This shall include all adjustments of manholes, vaults, valve cans, etc. as required by the Contract.
(4) All cat tracking and approval of proposed striping shall occur during the cure period. (5) Traffic loops must be installed after the approval of striping layout and prior to the installation of thermoplastic striping and pavement markings. (6) “No Parking Signs” shall be installed per Section 7-19 of these specifications.

302-5.4 Tack Coat. – Delete and replace with the following:

If the asphalt concrete pavement is being constructed directly upon an existing hard- surfaced pavement, a tack coat of High Performance Seal (HPS) No-Track Tack at an approximate rate of

0.05 gallon per square yard shall be uniformly applied upon the existing pavement preceding the placement of asphalt concrete. The surface shall be free of water, foreign material, or dust when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise approved by the Engineer.

GC 54

302-5.5 Distribution and Spreading. – Add the following:

Unless otherwise permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widening, turnouts, left-turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes are changed, the top layer for the through lanes shall be paved first. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed or unless directed by the Engineer.

All screed extensions for paving machines shall be provided with a tamper, roller, or other suitable compacting devices.

Asphalt pavers shall be equipped with automatic screed controls and a sensing device or devices.

Automatic grade and slope control shall be used for overlays.

All joints shall be sealed after rolling.

When placing asphalt concrete to the lines and grades noted in the plans or as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 ft. The ski device shall be a rigid one -piece unit and the entire length shall be utilized in activating the sensor. The Contractor may use a laser to control the screed.

When placing the initial mat of asphalt concrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 ft long.

The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.

When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 ft. tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.

Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day; however, the equipment shall be corrected or replaced with alternative auto matically controlled equipment conforming to the requirements in this section before starting the next day's work.

Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-

5.6.2 - Density and Smoothness, of the Standard Specifications, the paving operation shall be discontinued and the Contractor shall modify his equipment or furnish substitute equipment. A

GC 55

drop-off of more than 0.15 ft will not be allowed at anytime between adjacent lanes open to public traffic.

The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 ft. nor less than 5 ft. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.

302-5.6.1 General. - Add the following paragraph:

All asphalt concrete pavement abutting portland cement concrete gutters shall match and be flush with the gutter lip when finish rolling is complete.

302-5.6.2 – Density and Smoothness. – Delete and replace with the following:

The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminated by rolling or other means. The use of any equipment that leaves humps, ridges, irregularities or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.

The finished surface shall meet the following smoothness criteria:
• When a 12 foot long straightedge is laid on the finished surface parallel to the centerline of the roadway, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade,
• When a 12 foot long straightedge is laid on the finished surface perpendicular to the centerline of the roadway and extends from edge to edge of a traffic lane, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, exce pt at changes in grade.

If the top layer of pavement does not comply with the smoothness specifications shown, remove and replace the entire section or complete a grind and overlay of 1.5 inches or 3 times the aggregate size, whichever is greater. Grind and overlay will be considered as a repair method only when the thickness of the asphalt pavement section is greater than 1.5 inches following the required grinding. Corrected section shall be rectangular to the nearest pavement edge or lane line and to a crosswalk, concrete spandrel or other limits approved by the City. D o not begin corrective actions until the method and limit of correction is authorized by the City. If the tolerances cannot be achieved by the methods described above, the contract or must re -pave the street section, in kind, at their own expenses.

The compaction after rolling shall be a minimum of 91 percent and a maximum of 97 percent of the density obtained on samples compacted with the California Kneading Compactor per California Test 304. Cores will be taken randomly by the City for laboratory testing per California Test 308, Method A at a frequency of three per lot. A lot shall consist of a maximum of 3,000 square yards of asphalt concrete and will be identified in the field by the City . The cores will be

GC 56

averaged to determine the percent of m aximum theoretical density, as determined by ASTM D - 2041, per lot to the nearest tenth of a percent.

Reduced payment factors for percent of m aximum theoretical density will be per the following table, and will be applied to the entire lot sampled.

Reduced Payment Factors for Percent of Maximum Theoretical Density Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor

91.0 0.0000 97.0 0.0000

90.9 0.0125 97.1 0.0125

90.8 0.0250 97.2 0.0250

90.7 0.0375 97.3 0.0375

90.6 0.0500 97.4 0.0500

90.5 0.0625 97.5 0.0625

90.4 0.0750 97.6 0.0750

90.3 0.0875 97.7 0.0875

90.2 0.1000 97.8 0.1000

90.1 0.1125 97.9 0.1125

90.0 0.1250 98.0 0.1250

89.9 0.1375 98.1 0.1375

89.8 0.1500 98.2 0.1500

89.7 0.1625 98.3 0.1625

89.6 0.1750 98.4 0.1750

89.5 0.1875 98.5 0.1875

89.4 0.2000 98.6 0.2000

89.3 0.2125 98.7 0.2125

89.2 0.2250 98.8 0.2250

89.1 0.2375 98.9 0.2375

89.0 0.2500 99.0 0.2500
< 89.0 Remove and replace > 99.0 Remove and replace

In addition to the reduced payment factors below, all costs associated with the testing of the lot which resulted in values outside of the 91-97 percent range, will be withheld from the final payment due to the Contractor.

Following completion of the testing by the City, the core locations within the asphalt pavement shall be repaired by the Contractor.

302-5.6.3 Tracking. All areas receiving asphalt pavement shall be protected from tracking onto adjacent areas. Do not allow traffic on new asphalt pavement until its mid -depth temperature is below 140º Fahrenheit to minimize the tracking.

A rock dust blotter coat per Section 302-9.7 or a sand coat at a rate of 1-2 pounds per square yard shall be applied to the compacted surface for all areas where tracking is a concern. The application of tracking prevention measures shall be determined by the Contractor.

GC 57

A haul route for all paving operations shall be reviewed and approved by the City prior to the start of any construction activity. No deviations from the approved haul route shall occur unless approved in writing from the City.

All tracking onto adjacent streets, striping or pavement markings shall be the responsibility of the Contractor. All striping and pavement markings shall be removed and replaced in kind by sandblasting. All tracking onto roadway surfaces may require the use of a street sweeper to the satisfaction of the City.

302-5.7 Joints. – Add the following:

Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected. Longitudinal and transverse joints shall be tested with a 12’ straightedge and shall be cut back as required to conform to the provisions in Subsection 302-5.6.2 Density and Smoothness for surface smoothness. Connections to existing surfacing shall be feathered to conform to the provisions for smoothness.

Longitudinal joints in the top layer shall correspond with the edges of proposed lane striping.

Longitudinal joints in all other layers shall be offset not less than 0.5' alternately each side of the edges of traffic lanes.

All feathered joints shall be sealed after rolling.

302-5.9 Measurement and Payment. – Add the following:

Reduced payment factors per 302- 5.6.2 will be applied to the Contract Unit Price for lots with a Maximum Theoretical Density less than 91.0 and greater than 97.0 percent.

302-5.10 Hot Asphalt Leveling Course. Areas to receive the Hot Asphalt Concrete Leveling Course shall be determined and defined by the project manager and inspector, and identified to the Contractor in the field. Mix for hot Asphalt Concrete Leveling Course shall be 1/2 inch aggregate, C2, as defined in Section 203-6.4.3.

Areas to receive hot asphalt concrete leveling course shall be areas located near or adjacent to existing curbs and/or gutters that are potholed, or have the lip of gutter higher than the adjacent roadway. Potholes, large cracks, or ruts shall be filled t o the surrounding grade elevation and compacted. Hot Asphalt Concrete Leveling Course shall be completed prior to the placement of Type II Slurry Seal, ARAM or resurfacing.

Prior to placement of asphalt concrete, the surface shall be cleaned and all debris and deleterious materials shall be removed. A tack coat meeting the material and application requirements of Section 302-5.4 Tack Coat, shall be applied prior to placement of hot mix asphalt concrete.

302-5.11 Asphalt Pavement Crack Sealing and Filling. Crack sealing shall only be performed as a repair method for conventional hot mix asphalt pavement (HMA) and not installed at project locations which will have asphalt rubber hot mix (ARHM) used as the overlay material. Crack

GC 58

sealing shall be performed after milling of existing asphalt surface and prior to any leveling course, if necessary.

Right after milling of existing asphalt and before crack sealing or filling, Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least seven (7) calendar days prior to paving. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to paving. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for paving.

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203 -6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack seal er material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION

303-1 CONCRETE STRUCTURES.

303-1.1 General. - Delete the first sentence of paragraph 1 and replace with the following:
“Concrete bridges, culverts, catch basins, retaining walls, abutments, piers, footings, foundations, drainage inlets, head walls, end walls, wing walls, junction structures, transition structures, manholes, and other similar types of portland cement concre te structures shall be constructed to the lines and grades in conformity with the Plans and Specifications.

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.

303-5.1.1 General. - Replace the last paragraph with the following:

GC 59

No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.

All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.

The Contractor shall barricade and protect placed PCC from all damage, marks, mars, and/or graffiti. Any PCC damaged, defaced, discolored, or defective shall be replaced at the Contractor's expense.

When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps. The Contractor is to construct all access ramps in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. If the ramps constructed by the Contractor are found to be in non- compliance with ADA Standards, the Contractor will be required to remove and replace the ramps to ADA Standards at the Contractor's expense.

303-5.1.2 Drainage Outlets Through Curb. - Add the following paragraph:

Coring shall be required for all drains through existing curbs.

303-5.1.3 Driveway Entrances. – Replace the last paragraph with the following:

Driveway approaches where required, shall be 150 mm (6") thick for single-family residential area, and 200 mm (8") thick for commercial driveway approaches.

303-5.1.4 Walk. The back of sidewalk shall be 2 inches from the street Right-of-Way line unless otherwise specified by the Engineer.

Included in the price of sidewalk construction are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished sidewalk surface, as a result of grade differentials from existing ground surface to proposed sidewalk surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.

303-5.1.5 Access Ramps. Construction of curb ramps shall conform to the Type and Case appropriate for the condition, as specified on the plans and as shown within the 2012 Standard Plans for Public Works Construction, Plan 111- 5. The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum slope indicated on the plans or Standard Plan 111-5. The maximum slope for the ramp shall not be exceeded unless otherwise approved in writing by the Engineer. The Contractor shal l remove and replace access ramps deemed non- compliant with the plans or Standard Plan 111-5.

For proposed locations adjacent to a cross gutter spandrel, sawcuts along the radius of the curb will not be allowed. The spandrel shall be replaced from expansion joint to expansion joint to the extents of the curb removal. For proposed locations adjacent to curb and gutter, sawcuts along the flowline of the curb will not be allowed. The entire curb and gutter shall be replaced from expansion joint to expansion joint as required. Sawcuts at locations other than the expansion joint

GC 60

will not be allowed unless approved by the Engineer. Curb cuts of the existing curb will not be permitted for installation of proposed ramp. Any deviation from these requirements will result in rejection of all work at this location and shall not be incl uded in progress payment requests until corrected, per direction from the Engineer.

The Contractor shall verify the extents of sawcut and removal for each access ramp taking into account the maximum slope and transition area required. It shall be the Contractor’s responsibility to identify required removal limits, set concrete forms and verify maximum slopes are not exceeded. The Engineer shall be present to verify the concrete forms prior to the placement of the concrete at each location, however this does not alleviate the responsibility of the accuracy of forms or slopes of the access ramp from the Contractor.

Included in the price of access ramps are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished ramp surface, as a result of grade differentials from existing ground surface to proposed ramp surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.

Access Ramps shall have truncated domes installed in accordance with standard plans and specifications. Truncated domes on new access ramps shall be Armor-Tile, Cast in Place System, Equal Tile, or approved equal. Truncated domes installed on existing surfaces shall be Safety Sted TD, or approved equal. Truncated dome panels shall be 36”x48” , inline configuration, with a spacing of 2.35” on center, and Federal Yellow in color.

The access ramp work shall include all related adjustments of pull boxes, pull box covers, signs, and protection of any underground utilities within the work area. The removal and replacement of up to 5 linear feet of sidewalk on each side of the access ramp shall be included within the cost of the access ramp. The removal and replacement of the sidewalk will allow for transition from the top of ramp to adjacent sidewalk and will be utilized as necessary.

303-5.4.3 Weakened Plane Joints, (a) General. - Add the following paragraph:

All weakened plane joints shall be spaced at a maximum of 3.05 m (10') feet for curbs, gutters, and sidewalks. Scoring lines shall conform to those prevailing in the area and be uniform in spacing.

303-5.5.2 Curb. - Replace the first paragraph with the following:

PCC for curb and gutter shall be placed within three working days from removal of the existing PCC curb and gutter. The curb and gutter surface shall not vary more than 3 mm (0.01') from a 3 m (10') straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 3 m (10') in length, and operated longitudinally over the surface of the concrete. Form clamps shall be constructed so as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1) hour, nor more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and

GC 61

face of the finished curb shall be true and straight, and top surface of curbs shall be of uniform width, free from humps, sags, blemishes, or other irregularities.

303-5.5.3 Walk. - Add the following paragraphs:

The sidewalk surface shall not vary more than 5 mm (0.02') from the 3m (10') straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 100 mm (4") thick, except at driveways where the sidewalks shall be a minimum of 150 mm (6") thick for single family residential areas and 200 mm (8") thick for all other areas.

303-5.6 Curing. - Add the following paragraph:

Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4 Concrete Curing Compound, of the Standard Specifications.

303-5.7 Repairs and Replacements. - Add the following paragraphs:

In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.

The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.

Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.

Concrete replacement areas shall be from score mark or control joint to score mark or control joint, and full width of the sidewalk. All replacement areas shall be saw cut.

303-5.8 Backfilling and Cleanup. - Add the following paragraph:

A minimum of 300mm (12”) wide full depth asphalt concrete pavement repair patch and an 450mm (18”) wide 1 -1/2” deep grind outside of the trench width is required when cross gutter, spandrel, driveways, curb and gutter is placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be saw cut. All work shall be in a ccordance with the General Permit Conditions and Trench Specifications, latest edition.

SECTION 304 - METAL FABRICATION AND CONSTRUCTION

304-3 CHAIN LINK FENCE.

304-3.4 Measurement and Payment. - Delete paragraph 1 and replace with:

Chain link fence will be measured along the horizontal projection line of the completed fence, deducting the widths of gates and openings.

GC 62

SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS

314-1 GENERAL. - Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during all striping operations. Refer to Section 7-8.6.

Each storm drain catch basin or storm drain inlet box shall be marked “NO DUMPING - FLOWS TO CREEK.” Two coats of paint are required. Stencil shall match City’s stencil. Paint and painting shall comply with the specifications.

All street resurfacing work shall include installing fire hydrant pavement markers at all fire hydrant location, whether the pavement markers were existing or not. The pavement markers shall be Type I – Two-Way Blue Retroreflective per Section 214-6 of the Specifications and installed per City’s detail drawing No. 102-0. All work associated with the installation of all new, or replacement of existing, fire hydrant pavement markers shall be included as noted within the specifications.

314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.

314-4.1 General. – Add the following paragraphs:

During construction, if traffic legends or lane striping are removed or paved- over for any reason, they shall be replaced immediately with temporary traffic legends or lane striping as directed by the City, and the Contractor shall place permanent traffic legends or lane striping at the end of the job or on completion of final paving. When permanent items are placed, they shall be complete markings, legends, or striping i.e.: if limit lines are disturbed, they shall be replaced to centerline or from curb to curb, whichever was existing; if a letter in a word is removed or covered, the entire word shall be replaced; and lane striping shall extend 75 feet beyond construction limits. All replacement markings, legends, or striping required to be replaced beyond the c ontract limits shown shall be at the cost of the Contractor and shall meet City standards. If existing striping or legends are to be removed on existing surfaces, they shall be sandblasted. Painting over striping or legends in lieu of removal will not be permitted. Pavement striping shall comply with the applicable provisions of Sections 214 and 314 of the Standard Specifications.

Where side streets with existing striping, markings and markers are encountered, striping, markings and markers shall be repainted and replaced for a minimum distance of 15 m (50 feet) from the crosswalk, stop bar or limit line.

314-4.2 Control of Alignment and Layout.

314-4.2.1 General. - Delete and replace with the following:

The Contractor will be responsible for all layout of all striping. All striping, markings and markers shall be reinstalled in their existing locations unless otherwise shown on the plans. The Contractor shall be responsible to take appropriate measures and record the existing locations.

GC 63

The Contractor shall verify all dimensions in the field prior to installation of pav ement striping/marking layout ( Cat-Track). Should field measurements differ from the plan, the Contractor shall immediately notify City staff. No Cat -Track marks shall be placed until discrepancies are resolved.

Cat-Track must be approved by City staff prior to the installation of permanent pavement striping/marking. Contractor shall notify City staff a minimum of 24 hours prior to installation of permanent pavement striping/marking to allow for inspection and approval. If approval of Cat - Track is not obtained by the Contractor, all work required to correct the striping/marking will be at the expense of the Contractor

Cat-Track marks shall be made in chalk. Paint for the purpose of Cat-Track is prohibited. If paint is used, the Contractor must r emove the paint without damaging or visually deforming the pavement surface. If damage or visual deformity within the removal area occurs, in the opinion of City staff , the C ontractor shall grind and overlay the entire segment with no additional compensation. The area of the grind and overlay shall be as required by City staff and shall be a minimum of 0.10’ thickness.

All visible Cat -Track markings after the installation of the permanent striping/marking shall be removed without damage or visual deformity to the pavement surface. Any damage or visual deformity to the pavement shall be remedied as noted above.

314-4.3.5 Application. - Amend the first sentence in paragraph 8 as follows:
“Glass beads shall be applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”

314-6 GREEN BIKE LANE. Green bike lanes shall be installed per plan and conform to the technical specifications included within the contract documents and shall be Streetbond CL or approved equal.

THIS PAGE INTENTIONALLY LEFT BLANK

GENERAL REQUIREMENTS

THIS PAGE INTENTIONALLY LEFT BLANK
COORDINATION OF WORK, PERMITS, AND REGULATIONS 01110-1

SECTION 01110 COORDINATION OF WORK
PART ONE – GENERAL

1.1 SEQUENCING OF WORK
The Contractor shall submit the construction schedule in accordance with Section 01321 of these specifications. The Contractor shall determine the order of work based upon the Areas identified on the plan set and incorporate these into the schedule.

The Contractor shall arrange the schedule of work, but it must adhere to the following restrictions:

1. Vehicular access to the alleys may be restricted for up to two weeks to complete all clearing, earthwork, concrete, and paving operations, with specific prior written approval from the City’s Engineer. The Contractor must provide both written and verbal notice to affected property owners and/or residents at least forty-eight (48) hours in advance of any access limitations. Stockpiling of materials or equipment within the alleys will not be permitted at any time. Alleys shall remain accessible during non-working hours to utility company vehicles at all times within two weeks duration.

2. Paving and related work must follow the timeline per Section 302-5.2 of the specifications.

3. Citywide events calendar shall be considered with the schedule for construction.

4. Construction around school zone shall be taken into consideration to avoid interference with the drop-off and pick-up times for each specific school.

5. All non-paving construction activities may be scheduled by the Contractor in any sequence; however, each activity must receive prior approval from the City.

6. Utilities projects (sewer & water) and paving project may be under construction concurrently. Detailed construction activities and construction schedule will be provided during weekly construction meetings.

1.2 UTILITY COORDINATION
During construction, if City owned utility facilities are damaged, contractor shall inform the City. City crew will respond within two hours and assess the condition, and perform any necessary remedial work as quickly as possible. No additional compensation will be granted to the contractor for any delay due to the damage and repair of the utility facility.

Other utilities not owned by the City, contractor should notify and coordinate with the utility owner.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

DESCRIPTION OF WORK 01112-1
SECTION 01112 DES CRIPTION OF WORK

PART ONE -- GENERAL

1.1 S
UMMARY
A. The
work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the 2025 Alley Paving Improvement Project for the City of Redlands, all in accordance with the Contract Documents.

B. The following contract drawings are made a part of these Contract Documents:

Title Sheet No.
1 2
3 4
4 5
Title Sheet & Vicinity Map
General Notes, Construction Notes, Symbol Legend and Details Alley 1 – North of San Bernardino Ave, from Alta St to Glover St Alley 2 – North of Vine St, from Eureka Street to 4th Street Alley 3 – North of Citrus Ave, from Redlands Blvd to Church St Alley 4 – Northeast of Normandie Ct, from Clark St to Fern Ave Alley adjacent to 1711 Washington Street 5

1.2 GE

NERAL SCOPE OF WORK
A. Wor
k In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of the 2025 Alley Paving Improvement Project as noted on the Contract Drawings and all other Contract Documents and is summarized as follows:

1. The Work shall consist of paving various alleys throughout the City. The scope of work also includes removal and replacement of driveways and sidewalks where necessary; protecting in place all existing utilities, trees, power poles, and public and private improvements; replacing destroyed survey monuments; constructing concrete v -gutters; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions.

2. The Contractor shall, upon completion of the Alley Paving Improvements and appurtenances required herein, initially operate all components of the Contract Work furnished and installed by Contractor, and make any additional adjustments, corrections, repairs, replacements, and reconstructions necessary to provide the City with complete Alleys and appurtenances, including restoring all areas to pre - construction conditions.

END OF

SECTION

THIS PAGE INTENTIONALLY LEFT BLANK
MEASUREMENT AND PAYMENT 01200-1

SECTION 01200 MEASUREMENT AND PAYMENT

A. Work Listed in the Schedule of Work Items

1. The application for payment will be for a specific item based on the percentage completed or quantity installed. The percentage complete will be based on the value of the partially completed work relative to the value of the item when entirely completed and ready for service.

2. A retention of five percent (5%) of the value of work completed will be withheld from progress payments. This retention amount will remain constant throughout the contract period, and will not be payable until the expiration of thirty- five (35) days after the recordation of the Notice of Completion.

B. Work Not Listed in the Schedule of Work Items
The General Conditions and items in the G eneral Requirements, and S pecifications which are not listed in the schedule of work items of the bid form are, in general, applicable to more than one listed work item, and no separate work item is provided therefore. Include the cost of work not listed but necessary to complete the project designated in the contract documents in the various listed work items of the bid form.

The bids for the work are intended to establish a total cost for the work in its entirety. Should the Contractor feel that the cost for the work has not been established by specific items in the bid form, include the cost for that work in some related bid item so that the proposal for the project reflects the total cost for completing the work in its entirety.

The Contractor may experience difficulty in excavation due to rock or unsuitable backfill material throughout the project locations. It shall be the Contractor’s responsibility to identify these areas and account for difficulty in excavation, the need to export rock or unsuitable backfill material and the need to import suitable backfill material. There will n ot be additional contract time or additional compensation for any project locations where any of these circumstances occur.

C. Bid Items

1. Mobilization, Bid Item 1:

Payment for Mobilization shall be made at the contract lum p sum price and shall constitute full compensation for all labor, material, equipment, and incidentals required within Section 01721. The bid price shall include, but not limited to, preliminary construction schedule, bonds, insurance, installation and relocation of information signs, shop drawings, catalog submittals and shall constitute full compensation for all labor, MEASUREMENT AND PAYMENT 01200-2

material, equipment and incidentals required . The bid price for mobilization shall not exceed 5 percent of the Bid Schedule Price.

2. Erosion Control, Bid Item 2:

Payment for Erosion Control Plan shall be made at the contract lump sum price and shall constitute full compensation for preparation, approval, NPDES Permit and shall include all labor and incidentals noted within Section 01571.

Payment for the Erosion Control Plan shall be made based on the percentage of project completion to ensure compliance with all requirements. The completeness shall be determined by the Engineer and updated on progress payments.

3. Survey, Bid Item 3:

Payment for Survey shall be made at the contract lump sum price and shall constitute full compensation for research, construction surveying, construction staking, preparation and submittal of surveying cut sheets, tying existing control monuments that may be damaged or disturbed prior to construction, verifications of horizontal and vertical position of existing control monuments, recovery and reestablishment of damaged or disturbed control monuments after construction, preparation and submittal of corner records to applicable government agencies, and shall include all labor and incidentals noted within Section 01722.

Payment for the Survey shall be made based on the percentage of project completion to ensure compliance with all requirements throughout the duration of the contract . The completeness shall be determined by the Engineer and updated on progress payments.

4. Removal of all trash and debris, shrubs, bushes, tree stumps, existing pavement, concrete, v-gutter and pavement grindings from right of way, Bid Item 4:

Item includes but is not limited to removal of all: trash, debris, shrubs, bushes, tree stumps, existing pavement (AC and/or PCC), concrete, v-gutter and pavement grindings from right of way. Dust control and export to allow for installation of proposed improvements per the plans. This item includes asphalt grindings spread throughout the alley surface and shall only be paid when removal of all items have occurred, and the site is ready for installation of proposed improvements.

Payment for this item shall be made at the contract lump sum and shall constitute full compensation for all labor, material, equipment and incidentals required. No partial payment for this item will be released. All must be complete and operable before any compensation will be released.

5. Construct 2.5” AC over 4” Aggregate Base, Bid Item 5:

Item includes but is not limited to 2.5” AC over 4” aggregate base as specified on the project plans and specifications; construction surveying, potholing existing utilities, construction staking, traffic control, dust control, grading, removal of all trash, organics and asphalt grindings to prepare the surface for proposed improvements, compaction and export. Item shall also include all clearing and grubbing per Section 300- 1 of the General MEASUREMENT AND PAYMENT 01200-3

Conditions. Grading and shaping shall conform to Section 300, 301 and 302 of the General Conditions. Integrate new asphalt concrete pavement with existing residential driveways to create seamless transitional driveways.

Payment for this item shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required. No partial payment for Construct 2.5” AC over 4” Aggregate Base will be released. All must be complete and operable before any compensation will be released.

6. Construct 2’ Wide V-Gutter, Bid Item 6:

Item includes but is not limited to V-Gutter transition as specified on the project plans and specifications, construction surveying, construction staking, dust control, traffic control, grading, removal of all trash, organics and asphalt grindings to prepare the surface for proposed improvements, compaction and export. Item shall also include all clearing and grubbing per Section 300- 1 of the General Conditions. Grinding and shaping shall conform to Section 300, 301, and 302 of the General Conditions.

Payment for this item shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidents required. No partial payment for Construct 2’ Wide V -Gutter will be released. All must be complete and operable before any compensation will be released.

7. Construct V-Gutter Transition, Bid Item 7:

Item includes but is not limited to V -gutter transition as specified on the project plans and specifications, construction surveying, construction staking, dust control, traffic control, grading, removal of all trash, organics and asphalt grindi ngs to prepare the surface for proposed improvements, compaction and export. Item shall also include all clearing and grubbing per Section 300- 1 of the General Conditions. Grading and shaping shall conform to Section 300, 301 and 302 of the General Conditions.

Payment for this item shall be made at the contract unit p rice and shall constitute full compensation for all labor, material, equipment and incidentals required. No partial payment for V -Gutter transition will be released. All must be co mplete and operable before any compensation will be released.

8. Remove and Replace Driveway, 6” Thick PCC (560-C-3250), Compact top 6” to 95% compaction, Bid Item 8:

Item includes but is not limited to the removal and replacement driveway 6” think PCC including adjacent curb and/or gutter as specified on the project plans and specifications; construction surveying, potholing existing utilities, construction staking, traffic control, dust control, grading, removal of all trash, organics and asphalt grindings to prepare the surface for proposed improvements, compaction and export. Item shall also include all clearing and grubbing per Section 300- 1 of the General Conditions. Grading and shaping shall conform to Section 300, 301 and 302 of the General Conditions.

Payment for this item shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required. No partial MEASUREMENT AND PAYMENT 01200-4

payment for this item will be released. All must be complete and operable before any compensation will be released.

9. Remove and Replace 6” Thick PCC Sidewalk (560- C-3250), Compact Top 6” to 95% Compaction, Bid Item 9:

Item includes but is not limited to the removal and replacement of 6” thick PCC (560- C- 3250) sidewalk, compact top 6” to 95% compaction as specified on the project plans and specifications. Item includes but is not limited to erosion control, sawcutting, removal of varying thickness sidewalk, earthwork and compaction as required for the construction of new 6” thick concrete sidewalk. Sidewalk shall match the existing width and appearance of adjacent areas, as score lines and finish. Item also includes all necessary dust control, clearing, grubbing, grading, irrigation repair, information signs, survey monument preservation, and removals such as removal of vegetation, rubbish, and utilities as required for the construction of the proposed improvements under this bid item.

Payment for this item shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required, with no additional compensation or work allowed. No partial payment for sidewalk removal and replacement will be released.

10. Washington Street – Sawcut 12" Wide AC at Property Line, Gravel Backfill, and Redwood Header Installation, Bid Item 10:

Item includes but is not limited to all labor, materials, equipment, and incidentals necessary to perform a 12- inch wide sawcut of existing AC along the property line on Washington Street, as shown on the plans or directed by the Engineer. The contractor shall sawcut the AC cleanly and remove all debris and loose material from the area.

Where AC exists beneath any fence line, it shall also be fully removed to provide an open trench down to native soil or base material. The backfill shall be placed in lifts and compacted to provide a stable and level surface. The height of the gravel backfill shall be field-verified and adjusted as necessary to match the existing pavement elevation.

Following removal of the AC, the trench shall be backfilled with clean, Class 2 aggregate base or Crushed Miscellaneous Base (CMB) gravel per City standards compacted to 95% relative compaction. Redwood headers shall be installed flush at the edge of the trench perimeter to define the boundary and contain the gravel. Headers shall be securely anchored to resist movement, all joints shall be tight and level , and corners mitered or butted as appropriate to maintain alignment and containment.

Work shall include clearing and disposal of all debris, proper site preparation, and restoration of adjacent surfaces as needed. All work shall conform to applicable city standards and be completed in a neat and workmanlike manner.

Payment for this item shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment and incidentals required.

MEASUREMENT AND PAYMENT 01200-5

11. Demobilization, Bid Item 11:

Payment for demobilization shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment and incidentals required.

12. Unforeseen work not covered within all other bid items, Bid Item 12:

Payment for the unforeseen work not covered within all other bid items shall be made at the contract price per lump sum (LS) and shall constitute full compensation for all labor, materials, equipment, and incidentals required. Unforeseen work must be approved by the City staff before doing any work and pay estimate shall be negotiated based on unit price already established with the bid proposal for this project. Any required work that is outside of the proposed bid unit cost, shall be performed based on the Time and Material (T&M) basis and T&M cost shall be negotiated and approved by the City staff prior to performing the work. Unforeseen work will be paid in each billing cycle with a percentage of the lump sum cost included in the bid. This item may not be spent entirely.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

CHANGE ORDER REQUESTS 01251-1
SECTION 01251 CHANGE ORDER REQUESTS

1.1GENERAL
A.All quotations for preliminary change orders for extras, changes, additions, or deletions to the Work as described in EXTRA WORK of the GENERAL CONDITIONS shall be submitted to the ENGINEER, in writing, on the Change Order Request (COR) Cover Sheet and the Change Order Cost Summary Form, both attached, and in conformance with the requirements of Section 01254 CHANGE ORDERS. The quotation shall be firm for a period of not less than sixty (60) calendar days from the date of receipt of the quotation by the ENGINEER. The CONTRACTOR shall submit its written cost quotation and Time Impact Analysis not later than fifteen (15) days after being requested to provide such quotation, unless the ENGINEER allows more time. Delays in submitting quotations beyond the fifteen (15) days set forth herein, which cause a delay in the issuance of a Change Order or a delay to the completion date of the project, shall not be cause for a claim or a time extension under the Contract.

B.The ENGINEER'S request for quotation on a preliminary change shall not be considered authorization to proceed with the changed work prior to the issuance of a final Lump Sum or Time & Material Change Order, unless directed otherwise, in writing, by the ENGINEER, nor shall such request constitute justification for a delay to the existing Work or a time extension under the Contract.

END OF SECTION
CHANGE ORDER REQUESTS 01251-2

CHANGE ORDER REQUESTS 01251-3
Change Order Cost Summary
Project Name :

Change Order Request No. :

Date :

Direct
Labor
Direct
Materials
Direct
Equipment
(1): Lump Sum Work by
Prime Contractor $0.00 $0.00 $0.00
(2): "T&M" Work by
Prime Contractor $0.00 $0.00 $0.00
(3): Subtotal - Direct Work
(Prime Contractor) $0.00 $0.00 $0.00

(4): All Lump Sum Work by
subcontractors (any tier) $0.00 $0.00 $0.00
(5): All "T&M" Work by
subcontractors (any tier) $0.00 $0.00 $0.00 Totals
(6): Subtotal - Direct Work
(all subcontractors) $0.00 $0.00 $0.00 $0.00
Add each of the
(3)+(6)=(7): Total - Direct Costs three columns
$0.00 $0.00 $0.00
across and enter
$0.00
to the right.
(8): Markup
(20%
of
direct
labor)
(15% of
direct mat'l)
(15% of
direct equip)
$0.00 $0.00 $0.00 $0.00

(9): Prime Contractor
Markup 10% of line (6) direct sub work up to $5,000 for subcontractors plus 5% of line (6) direct sub work over $5,000

(10): Bonds & Insurance 1% of line (7)
all direct work
$0.00

(11): Additional amount
permitted by Contract

(12): GRAND TOTAL Add sums of lines)
(7), (8), (9), (10) and (11)
$0.00

THIS PAGE INTENTIONALLY LEFT BLANK

CHANGE ORDERS 01254-1
SECTION 01254 CHANGE ORDERS

PART ONE -- GENERAL

1.1 REQUIREMENTS
Payment to the Contractor, or credit to the City, for any change, addition, deletion or extra to the Work, or settlement of any Claim, covered by any Change Order, shall be determined by the methods set forth herein. The Engineer may change the Plans and Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed twenty-five percent (25%) of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and the City, which shall be executed by a Change Order.

Unless otherwise stipulated, “Unit Prices” include all costs necessary to furnish, install and complete the Work. The “Unit Prices” include all direct costs for labor, equipment and materials, all insurance and bond costs, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but is not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax.

A. Unit Prices
Unit prices stipulated in the Bid or itemized in the approved Schedule of Values shall be utilized, where they are applicable and determined reasonable by the Engineer. In the event that the Change Order results in a change in the original quantity of more than twenty-five percent (25%), either increase or decrease, then either the Engineer or the Contractor may request a review of the unit price to determine if a new unit price shall be mutually determined by negotiation. Any new unit price mutually determined under this Subsection shall only apply to the units in excess of one hundred twenty five percent (125%) of the original quantity for overruns. In case of underruns, the unit price stipulated in the Bid shall be applied to the first twenty-five percent (25%) of the actual quantity of work performed and the new mutually determined price shall be applied to the quantity between twenty-five percent (25%) and seventy-five percent (75%) of the original quantity.

CHANGE ORDERS 01254-2
Renegotiated unit prices or unit prices for new items added to the Contract by Change Order shall be determined in accordance with Subsections B through G.

Whether stipulated in the Bid, itemized in the approved Schedule of Values or renegotiated, the unit prices used for payment constitute the total adjustment with no further costs owed for overhead, impact, profit, delay or impact to unchanged portions of the Contract, or any other reason. The unit price shall be full and final compensation as described in Subsection D.

The cost proposals for renegotiated unit prices shall be presented in accordance with the provisions of Subsections B through G. Should any Bid Item be deleted in its entirety, the amount bid for that bid item shall be subtracted from the total Contract amount. The Contractor shall be paid only for the actual cost incurred prior to the notification of such deletion for that Bid Item.

B. Lump Sum
The Engineer and the Contractor may mutually determine a total sum for the Extra Work. The Contractor shall summarize the total cost and furnish a breakdown of the proposed lump sum costs satisfactory to the Engineer in accordance with Subsections B through G. Such lump sum costs shall be full and final compensation as described in Subsection D. The Contractor’s quotation shall conform to the requirements of Section 01251- Change Order Requests, and be submitted in the Change Order Cost Summary Form provided (see Attachment 01251-A1). The Change Order Cost Summary Form cannot be used to nullify or supercede any specification or contractual provision.

If the method or amount of payment cannot be agreed prior to performing the Extra Work, the Engineer may unilaterally issue a Change Order in the amount determined reasonable by the Engineer for the Extra Work and direct the Contractor to proceed immediately. The Engineer also has the option to issue a Change Order directing the Work be done on a Time and Materials basis with the Contractor providing all labor, equipment, and materials necessary to complete the Work in a satisfactory manner and within a reasonable period of time.

Estimates for lump sum quotations and accounting for Time and Materials work shall be limited to direct expenditures necessitated specifically by the subject Extra Work, and shall be segregated as follows:

1. Labor, up to and including working general foremen, who are directly assigned to the Extra Work. Employees identified as superintendents or non-working general foremen shall not be charged as labor on Extra Work. The labor costs shall include actual documented payroll costs including wages, payroll taxes as established by law (i.e., FICA, Federal and State Unemployment Taxes), fringe benefits as established by negotiated labor agreements, and any insurance costs (such as Worker's Compensation and General Liability Insurance but shall not include Automobile Liability Insurance or any other insurance costs). A detailed CHANGE ORDERS 01254-3
breakdown of those subcomponents of labor costs, by all crafts shall be submitted to the Engineer, by the Contractor and all Subcontractors, for approval, as part of the documentation of labor costs, within ten (10) working days after issuance of the Notice to Proceed. No other subcomponents of labor costs shall be considered, unless approved in writing by the Engineer.

The labor cost is not allowed to be increased by using labor classifications with paygrades higher than necessary to accomplish the Work.

2. Materials: The cost of materials used in performing the Extra Work will be the cost, including sales tax and freight, to the purchaser, whether Contractor, Subcontractor or other forces, from the supplier thereof, except as follows:
a. Cash or trade discounts available to the purchaser shall be credited to the City notwithstanding the fact that such discounts may not have been taken by the Contractor.
b. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the Engineer. Supplier markup, except for actual costs incurred in the handling of such materials, will not be allowed.
c. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on contract items or the current wholesale price for such materials delivered to the Jobsite, whichever price is lower.
d. If, in the opinion of the Engineer, the cost of materials is excessive, or the Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for the quantity concerned, delivered to the Jobsite less cash or trade discount. The City reserves the right to furnish materials for the Work and no claim shall be made by the Contractor for costs and profit on such materials.
e. For the purposes of this Section, a "Supplier" is defined as any person or persons, firm or business, who supplies materials of construction and/or permanent equipment, but who does not perform any portion of the Work of the Contract on site, for the Contractor, except that labor or labor supervision which may be required by some manufacturers as part of their equipment installation for warranty or other purposes.

CHANGE ORDERS 01254-4

3. Equipment Costs, including ownership, lease or rental costs, as well as operating costs, for individual equipment units whose replacement value is in excess of $500. Transportation and set up costs shall be included, but only if the equipment is imported to the worksite solely to perform work on the Extra Work described in the Change Order and the Contractor can demonstrate that the changed work cannot or could not be performed economically with equipment already at the site. Equipment costs shall be determined in accordance with the requirements set forth in Subsection G.

4. Small tools, equipment, consumables and incidental costs: No separate payment will be made for the use of small tools or equipment with a replacement value of $500 or less. This applies to tools and equipment owned by the Contractor or its subcontractors of any tier. Also, no separate payment will be made for fuel, lubricants, tool or equipment repairs, tool or equipment maintenance, consumables, drinking water, sanitary facilities or other incidentals. These costs are already included as a part of Markup.

5. Subcontractor Costs, including their overhead and profit, provided that such costs are direct costs to the Contractor for performing the Extra Work as set forth in Subsections B through G.

C. Time and Materials Work
The costs of all Changed/Extra Work submitted under the Time and Materials (T&M) method shall be formulated in accordance with the provisions of Subsections B through I.

Unless otherwise stipulated on the Change Order, the “Not-to-Exceed” amount for all T&M Change Orders is $10000. The Contractor is responsible for tracking costs and for notifying the Engineer in writing when costs approach 50% and 75% of the “Not-to-Exceed” amount. In addition, if the Changed/Extra Work cannot be completed within the “Not-to-Exceed” limit, the Contractor shall notify the Engineer in writing, and in a timely manner, that the limit requires an increase.

The City will only reimburse eligible costs up to the “Not-to-Exceed” amount.

The Contractor shall notify the Inspector at the beginning of each day when Changed/Extra Work is being performed. The Contractor shall notify the Inspector of the Changed/Extra Work being performed and describe the personnel involved, whether by Contractor forces or by its subcontractors at any tier. Failure to notify the Inspector prior to the start of Changed/Extra Work serves as the Contractor’s waiver to claim for compensation on that day.

For each working day, the Contractor shall submit a “Daily Extra Work Report” (DEWR) to the Inspector. The “Daily Extra Work Report” shall summarize labor, CHANGE ORDERS 01254-5
equipment and materials supplied. The Inspector will only consider Forms that are properly completed as described below.

1. Separate forms must be used for labor and for equipment/materials.

2. Labor, equipment, material or expenditures that are not included on The DEWR are ineligible for payment. There will be no exceptions to this requirement. It is the responsibility of the Contractor to include any and all items of labor, equipment, or material for which it requests compensation for each day’s work completed.

3. Information required on the Labor form shall include name of personnel, personnel classification, and only the number of hours worked on Changed/Extra work for the day being reported. Since the overhead allowance already includes all necessary supervision, any hours for additional supervision or non-working foremen are ineligible for additional payment. The premium pay for a general foreman is eligible for payment only if the general foreman is a working foreman and a general foreman was required by a Union Labor Agreement or otherwise approved by the Inspector. The general foreman rate is eligible for payment only during the time that a general foreman was required for the Changed/Extra Work.

4. Information required on the Equipment/Material shall include Contractor- owned equipment and/or tools, and rented equipment or tools for which compensation is requested. Information shall include the type of equipment, size of equipment, equipment identification number, appurtenances, and only the number of hours worked on the Changed/Extra work.

5. The only allowable materials are materials delivered to the job site and/or incorporated only into the Changed/Extra work. The allowable materials shall be listed on the T&M sheet for the day that they are delivered to the job site and/or incorporated into the Changed/Extra work.

6. Delivery ticket(s) and/or bill(s) of lading for rental equipment and/or tools delivered to the site and/or material incorporated into the work for the day being reported must be attached with the T&M sheet for that day. No payment will be allowed for materials and/or rented equipment unless receipt(s) or bill(s) of lading is attached. If the request for payment is not substantiated by original vendor/supplier invoices, acceptable copies of original invoices, or other documentation acceptable to the Inspector, the City may establish the cost of the item(s) at the lowest possible wholesale price or rental rate applicable while the work was being performed.

CHANGE ORDERS 01254-6

7. Failure to submit the required “Daily Extra Work Report of Time and Material Work” by the close of the next working day shall waive all rights for that day unless otherwise approved by the Inspector. Work that cannot be substantiated by a “Daily Report”, approved and signed by the Inspector, is ineligible for payment.

8. The Contractor is responsible for preparing the “Daily Extra Work Report” for work by its Subcontractors and submitting the Forms to the Inspector on time.

9. The Contractor must have each “Daily Extra Work Report” verified by the Inspector. After the “Daily Extra Work Report” is approved by the Inspector, both the Contractor and Inspector sign the report. The original “Daily Extra Work Report” is retained by the Inspector with a copy provided to the Contractor.

10. When the “Daily Extra Work Report” is signed by the Inspector and the Contractor, it is binding on the Contractor and its Subcontractors.

11. When agreed to by the Inspector, the Contractor may submit a supplemental “Daily Extra Work Report” for labor, materials, or equipment for which the Contractor requests compensation but failed to list on the original daily report.
a. These supplemental forms shall be marked “SUPPLEMENTAL”. b. Unless otherwise approved by the Inspector, the supplemental forms may only be submitted for approval up to two (2) working days following the date when the work was performed.

No payment will be allowed for labor, materials, or equipment included on T&M sheets not signed by the Contractor and the Inspector. Payment will not be allowed for labor, materials, or equipment included on T&M sheets signed by anyone other than the Inspector or the Inspector’s immediate supervisor.

D. General
It is the intent of the City to settle all Change Orders full and final at the time the Change Order is issued. Therefore, the following paragraph shall be made a part of all Change Orders, whether included or not on the actual change order:
“The compensation (time and cost) set forth in a Change Order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers, for the Work or change defined in the Change Order, including impact on unchanged work. By signing the Change Order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all CHANGE ORDERS 01254-7
Suppliers, that the stipulated compensation includes payment for all work contained in the Change Order, plus all payment for the interruption of schedules, extended field overhead costs, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of the Change Order indicates that the Change Order constitutes full mutual accord and satisfaction for the change, and that the time and/or cost under the Change Order constitutes the total equitable adjustment owed the Contractor, all Subcontractors, and all Suppliers as a result of the change. The Contractor, on behalf of himself, all subcontractors, and all Suppliers, agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim related to this Change Order. No further claim or request for equitable adjustment of any type for any reasonably foreseeable cause shall arise out of or as a result of this Change Order or the impact of this Change Order on the remainder of the Work under this Contract.”
Costs which shall not be paid in Change Orders under this Contract include, but are not limited to, interest costs of any type; claim preparation or filing costs; legal expenses; the costs of preparing or reviewing proposed Change Orders or Change Order proposals; lost revenue; lost profits; lost income or earnings; rescheduling costs; costs of idled equipment when such equipment is not at the site or has not yet been employed on the Work; lost earnings or interest on unpaid retainage; claims consulting costs; and the costs of corporate officer or staff visiting the site; any compensation due to the fluctuation of foreign currency conversion or exchange rates; loss of other business; changes in taxes or increased tax rates of any kind or any costs identified as unallowable under the provisions of the Federal Acquisition Regulations.

Extensions of time shall be based solely upon the effect of delays to the Work as a whole. Extensions of time shall not be granted for delays to the Work, unless the Contractor can clearly demonstrate, through analysis of the current updated schedule, that the delay to the Work as a whole arose or will arise from causes other than normal weather, beyond the control and without fault or negligence of the Contractor, or any Subcontractor, at any tier, and that such delays did or will, in fact, delay the progress of the Work as a whole. The Contractor shall not be entitled to a time extension unless it submits a Time Impact Analysis which is a calculation of the extent of the delay to the end date of the Work and which shows that the Work has been or will be extended beyond the current Contract completion date. A Time Impact Analysis is a scheduling procedure which utilizes the networking techniques (fragnets) and a written analysis of the facts associated with the alleged delay to demonstrate the effect of the alleged delay on the critical path of the schedule. A "fragnet" is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing current updated schedule to demonstrate (mathematically and graphically) the influence of the alleged delay on the end date of the Work and shall be the sole method for incorporating delays and impacts into the schedule. The objective of a CHANGE ORDERS 01254-8
Time Impact Analysis is to pinpoint, isolate, and quantify all time impact associated with a specific issue and determine its time relationship to past or current delays. Time extensions shall not be allowed for delays to parts of the Work that are not on the critical path of the currently approved monthly updated project schedule. Time extensions shall not be granted, nor delay damages of any kind whatsoever paid to the Contractor, until all available float, slack, or contingency time on the project is used and the end date of the Work is moved beyond the current, adjusted Contract completion date.

The cost summary, cost breakdowns and requests for cost reimbursement submitted by the Contractor (for delay, disruption, hindrance and interference associated with the changes, additions, deletions or extras) shall be itemized in a manner that, with mathematical certainty and without reliance upon probabilities or inferences, segregates the direct, actual reimbursable costs associated with each individual, change, addition, deletion, extra and (on an event-by-event basis) each individual delay or disruption event. Such cost summaries, breakdowns or requests shall not be based, in whole or in part, upon any methodology (such as “total cost” or “modified total cost” methodologies) that purports to calculate the Contractor’s additional costs of performance of the extra, change, addition or deletion (including without limitation the additional costs of delay, disruption or other impact) based on the difference between Contractor’s total actual Project or line item costs (with or without fee) and its original bid estimate for the Project or any original bid estimate line item. In connection with the foregoing, Contractor represents and warrants that it has the ability to generate and maintain complete and accurate cost accounting records that will reflect (i) the actual costs incurred or saved for each individual item of Extra Work, change, addition, deletion (including without limitation any costs of associated delay, disruption, interference, hindrance and the cumulative impact of each extra, change, addition, deletion on other parts of the Work); and, (ii) on an event-by-event basis, the effect of each delay or disruption that forms the basis of each request for extension of time, regardless of their scope, number, complexity, cumulative effect, or time of issuance or occurrence.

Except as provided in Section 6-6 of the General Conditions, Contractor shall have no right to recovery of any compensation, costs, expenses or damages resulting from delay, disruption, interference, or hindrance in the performance of the Work (including without limitation interruption of schedules, excess or extraordinary extended field and indirect overhead costs, loss of productivity and the impact, ripple or cumulative effect on other Work).

Contractor waives any claim or rights and remedies based on abandonment, quantum merit, rescission or other similar legal theory by reason of any of the following circumstances, which the Contractor acknowledges and agrees are within the reasonable contemplation of the parties: (i) changes, additions, deletions and extras to the Work after execution of the Contract and issued from time to time throughout the period of construction, regardless of their scope, CHANGE ORDERS 01254-9
number, cumulative value, or complexity, to correct errors, omissions, conflicts, and ambiguities in the Contract Documents, or to implement discretionary changes to the scope of Work requested by the City; (ii) the issuance and performance of changes, additions, deletions and extras in a manner that is not in sequence with the as-built or as-planned progress of the Work; (iii) changes due to Differing Site Conditions; (iv) suspensions of the Work or parts thereof, or limitations on access to portions or all of the Work, for the convenience of City or in the interests of the Project; (v) delay or disruption to the Work due to failure of the City, Engineer or Inspector to timely perform any contractual obligation.

E. Markups – Overhead and Profit

1. In addition to the direct expenditures specified for labor, materials and equipment in Subsection B, a lump sum will be paid for all overhead and profit, including: All insurance costs other than specifically mentioned in this Section, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but are not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax. Such lump sum shall conform to the following schedule of percentages of the total amount of direct expenditures of the Contractor and subcontractors. (a) Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:
1) Direct Labor 20%
2) Direct Materials 15%
3) Direct Equipment 15%
(b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in (a) shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

CHANGE ORDERS 01254-10

2. Bonds and Insurance
An additional allowance of one percent (1%) of all direct costs (less markup) is allowed.

3. Add/ Deduct Changes
The overhead rates determined above shall be applied to all additive Change Orders, except those utilizing as-bid Unit Prices listed in the Bid Proposal.

Any change in the Work involving both extras and credits shall show a net total cost, including subcontracts. Allowances for overhead and profit to the net total cost, as specified herein above, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was signed.

4. When all or any part of the extra work is performed by a Subcontractor, the markup established in subsection 1.1.E.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

F. City Furnished Materials, Equipment and Services
The Engineer reserves the right to furnish materials, equipment and services deemed expedient for use on the Changed/Extra Work. The Contractor shall have no claim for profit or overhead on the cost of such materials, equipment and services.

G. Equipment Costs
The rates for rental or leased equipment shall not exceed the rates listed in the Caltrans Labor Surcharge and Equipment Rental Rates (Caltrans LS&ERR). For T&M Change Orders, the rates are established by the actual paid invoice(s) that comply with the requirements of Subsections G.1 and G.3. Owned equipment costs shall not exceed the rates established by Subsection G.2. The most recent published edition in effect at the commencement of actual equipment use shall be used.

The rates paid for any rented or leased equipment or tools shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance and all incidental costs associated with the operation of the equipment or tools.

CHANGE ORDERS 01254-11
It is the responsibility of the Contractor to include any appurtenances added to equipment which would increase the basic rate for said equipment (i.e., hoe-ram, oversize bucket, and etcetera) as established in the acceptable rental rate guide.

All equipment and/ or tools shall be acceptable to the Inspector, in good working condition, suitable for the purpose for which it is to be used, and necessary to complete the Changed/Extra Work. Payment will be based on the manner in which the equipment was actually powered, operated and modified per the equipment manufacturer’s recommendations.

1. Rented or Leased Equipment
For equipment rented or leased (including lease with purchase option) in arm's length transactions from outside vendors, the Contractor shall be paid the actual invoiced, rented or leased rates provided that the invoiced lease or rental rates do not exceed the rates set forth in the Caltrans LS&ERR. Arm's length rental or lease transactions are those in which the firm involved in rental or lease of such equipment is not associated with, owned by, have common management, directorship, facilities, or stockholders with the firm renting the equipment. Submittal by a Contractor of a rental or leased invoice from the lessor will be prima facie proof of compliance with the above. However, such invoices are not conclusive proof; if questioned, the burden of proof remains with the Contractor. In no event shall the leased equipment rate billed to the City be at rates exceeding those prescribed in the following table:

Actual Usage (Change Order
& Contract Work Combined) Payment Category
Less than 8 hours Hourly Rate
8 or more hours but less than 7 days Daily Rate
7 or more days but less than 30 days Weekly Rate
30 calendar days or more Monthly Rate
a. When in Use:

Actual equipment use time documented by the Inspector shall be the basis that the equipment was utilized on the changed work and paid for under the Change Order. In addition to the lease or rental rate, equipment-operating costs shall not exceed the estimated hourly operating rate as set forth in the Caltrans LS&ERR. The hours of operation shall be based upon actual equipment usage on the changed work as recorded by the Inspector. For multiple shift work sequences, the allowable equipment rate shall not exceed fifty percent (50%) of the base rate, for second or third shifts. b. When Idle:

CHANGE ORDERS 01254-12
Idle equipment is equipment on site and necessary to perform the Work under the change but not in actual use due solely to the impact of the changed work. Equipment operating costs due to idle time, documented by the Inspector, shall be paid at the rate determined in “G” (1) above. Idle time shall include a reasonable time allowance to and from the project site.

Payment for equipment or tools shall be limited to hours actually worked on the Changed/Extra Work if the equipment or tool is already on site for Work under the original Contract. No “standby” time will be paid for equipment already on site for Work under the original Contract.

If equipment or tools are used intermittently and, when not in use, could be returned to the rental source at less expense than holding it at the work site, it shall be returned, unless the Contractor elects to keep it at the work site at no expense to the City.

2. Owned and Other Equipment
Equipment rates for owned equipment or equipment provided in other than arm's length transactions shall not exceed the total hourly costs as set forth in the Caltrans “Labor Surcharge and Equipment Rental Rates” effective at the time the work is performed. (The Caltrans equipment rental rates are available on the internet at
http://www.dot.ca.gov/hq/construc/equipmnt.html.) If the equipment is not listed in Caltrans LS&ERR, then the Rental Rate Blue Book shall be used. When using the Blue Book, the hourly rate for any period less than 7 days shall be the weekly rate divided by 40, plus the Operating Cost.

Except as noted herein below, this equipment hourly rate plus the estimated operating cost per hour from the Blue Book will be paid for each hour the equipment actually performs the Extra Work. Daily records listing the equipment units and their respective operators, identification code, and actual usage on the Work under the Change Order, as certified at the end of each work day (or work shift if the Work is being performed in multiple work shift sequence) by the Inspector shall be the record upon which actual equipment use shall be based. For multiple shift work sequences, the Caltrans overtime factor shall be applied (When using the Blue Book one-half the Non-Operating Cost will be deducted for second and third shifts. The Non-Operating Costs are the Blue Book monthly or weekly/40 rates, as applicable.). It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.
a. When Idle:

CHANGE ORDERS 01254-13
Payment for equipment necessary to be on the site to complete the Work, but not in actual use due solely to the impact of the changed work, shall be paid per the table in Caltrans Standard
Specifications Section 9-1.03A(3b), provided that its presence and necessity on the site has been documented by the Inspector, and further provided that the equipment was idled solely by actions of the City. Idle equipment time will only be paid as a function of delays specifically directed or caused by the City's actions. In no event shall the idle time claimed in a day for a particular piece of equipment exceed the normal work schedule established for the project - usually eight (8) hours per day or forty (40) hours per week, and excluding Saturdays, Sundays, and holidays. For multiple shift work sequence, the allowable idle equipment rate shall not be allowed, for second or third shifts. It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.

3. Equipment Haulage and Set Up Costs
Documented and actual equipment haulage and set up costs shall be paid for, if applicable as set forth in Subsection B.3.

4. Other Equipment Cost Guides
In the event that a piece of equipment used on a Change Order is not listed in Caltrans or the Blue Book, costs may be derived from the Associated General Contractor’s of America Equipment Ownership Guide, the Associated Equipment Dealers Guide, or the Equipment Rate Guide published by the U.S. Army Corps of Engineers as adjusted appropriately for the type of work and use and the regional area of the Work under this Contract.

H. Records
At any time should the Contractor deviate substantially from the schedule, method and sequence of operation, equipment, cost or pricing data furnished by the Contractor and agreed to by the City in connection with the Change Order or should the City determine that any price negotiated in connection with the Change Order is defective due to such deviation or the fault of the Contractor, the City reserves the right to reduce the Change Order cost and reissue the Change Order at the amount in which the City determines to be the actual costs to complete the change.

Whenever any material or process is indicated or specified by patent or a proprietary name, or by name of a manufacturer in the Change Order, such direction shall not relieve the Contractor’s responsibility or obligation to perform CHANGE ORDERS 01254-14
work in accordance with the contract requirements. The Contractor shall be solely responsible for, and have control over construction means, methods, techniques, sequences and procedures, coordination of all portions of the contract and Change Order work.

The Contractor shall on a weekly basis submit an approximate accounting of the amount expended on the Time and Materials work to date and an estimate of the Impact to the time of performance of work.

I. Partial Payments for Time and Materials Work.

Progress payments for Time and Materials work shall only be made if the anticipated cost of the changed work is in excess of $50,000 and/or the time to perform the changed work will exceed two (2) months duration. To receive payments for Time and Materials work, the Contractor shall submit to the Engineer an invoice of the daily reports which were verified by the Inspector, with details and documents, verifying the Contractor’s and Subcontractor's actual costs incurred for the Time and Materials work as set forth in Subsections B through H. Costs shall be submitted within thirty (30) calendar days after the T&M work has been satisfactorily completed unless an extension of time for submittal is authorized in writing by the Inspector.

END OF SECTION
SCHEDULE OF VALUES 01298-1

SECTION 01298 SCHEDULE OF VALUES

1.1 GENERAL
A. The Schedule of Values shall be used as a basis for determining progress payments on a lump sum contract or any designated lump sum bid item. The Schedule of Values shall be a schedule of cost loaded construction activities equal, in total, to the lump sum bid and shall be in such form and sufficient detail to correctly represent a reasonable apportionment of the lump sum. Prior to submitting an invoice for payment, the CONTRACTOR shall have submitted a detailed Schedule of Values and obtained approval from the ENGINEER.

B. Each lump sum bid item on the Schedule of Work and Prices, as set forth in the Bid must be broken down separately. The breakdown of each lump sum bid item must cover the cost of construction required by the contract documents for that item. The sum of the values for the construction activities, within a bid item, must equal the total bid amount for that item. The breakdown shall include subcontract amounts which shall not deviate from the amounts submitted in the Bid Proposal. The CONTRACTOR shall provide certification from the Subcontractors certifying the subcontract amounts.

C. Each activity in the Schedule of Values shall delineate one construction activity.

For example, the placement of concrete between construction joints, the construction of an electrical duct bank or pipeline between points A & B. The costing for each activity should include all costs for the labor and materials or equipment required to complete the activity. For example, concrete construction activities should include all costs for the forming, placing of reinforcement, placing concrete and curing. The cost for pipeline construction activities should include materials, equipment and installation including pipeline supports or thrust blocks. The excavation and backfill for a pipeline or structure may be separate activities. The Contract Price breakdown shall include the itemized costs for the plant establishment and any maintenance services to be performed before the final project acceptance is made. No non-construction activity shall be cost loaded.

D. The CONTRACTOR shall use cost loaded construction activities from the Construction Schedule as a Schedule of Values. Each construction activity shall be encoded to its bid item and a sort provided for each bid item totaling the cost loaded amount. The total of the Cost Loaded amounts for each bid item shall equal the amount bid for that item. The total of the Schedule of Values shall equal the current Contract value at all times. At any time during the progress of the Work of the Contract the INSPECTOR reserves the right to review the cost loading of the Schedules of Values and direct necessary revisions. When requested by the INSPECTOR, the CONTRACTOR shall provide all information necessary to substantiate the cost loading.

SCHEDULE OF VALUES 01298-2

E. Attached are samples of the Schedule of Values. The City will provide project specific Schedule of Values for the CONTRACTOR to use throughout the project at the Preconstruction Meeting. The Schedule of Values must be used by the CONTRATRACTOR at the time of each progress payment.

END OF SECTION
SCHEDULE OF VALUES 01298-3

SCHEDULE OF VALUES 01298-4

SCHEDULE OF VALUES 01298-5

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION SCHEDULE 01321-1
SECTION 01321 CONSTRUCTION SCHEDULE

1. THE REQUIREMENT
A. It is expressly understood and agreed that the time of beginning, the rate of progress, and the time of completion of the Work are of the essence of this Contract.

B. The CONTRACTOR’S representative in charge of scheduling is required to attend all meetings pertaining to scheduling and progress of the Work.

C. The CONTRACTOR shall submit to the ENGINEER 3 hard copies and the electronic file of the CONTRACTOR'S Construction Schedule (the schedule) at the time of the preconstruction meeting. The schedule shall be either a Critical Path Method (CPM) Network or a detailed Bar Chart with the critical path clearly shown. If the CPM network option is used, then Primavera Project Management or Microsoft Project shall be the scheduling software. If a detail Bar Chart is used, Microsoft Excel shall be the software utilized. The schedule shall include the following:

1. Activity ID,

2. Activity Description,

3. Start date for each activity,

4. Finish date for each activity,

5. Original duration,

6. Predecessor,

7. Successor,

8. Percent Complete,

9. Remaining Days.

A minimum of seven (7) calendar days for review of each schedule. Schedule activities shall be of sufficient detail to assure adequate planning has been done for proper execution of the Work and such that, in the sole judgement of the ENGINEER, it provides an appropriate basis for monitoring progress. The schedule shall begin with the date of issuance of the Notice to Proceed and conclude with the date of Final Completion shown in the Contract. Submittal and approval of the schedule in accordance with the requirements of this Section is a condition precedent to the issuance of any payments under this Contract. Once the schedule is approved it will become the baseline schedule and must be shown and compared on all subsequent schedule submittals.

D. Float, slack time, or contingency within the schedule (i.e., the difference in time between the project's early completion date and the required Contract Completion date), and total float within the schedule, is not for the exclusive use of either the CITY or the CONTRACTOR, but is a jointly owned expiring resource available to and shared by both parties. Pursuant to this float sharing requirement, use of CONSTRUCTION SCHEDULE 01321-2
float suppression techniques shall be cause for rejection of the schedule and any revisions or updates.

E. Time extensions shall not be granted nor delay damages paid until a delay occurs which is beyond the control and without the fault or negligence of the CONTRACTOR and its Subcontractors or Suppliers, at any tier, and which extends actual performance of the Work beyond the current Contract completion date and the completion date projected by the current, approved, updated schedule. If the delay occurs along a path, which the current approved Construction Schedule update projects late completion prior to addition of any CITY caused delay, then the time extension allowed will be only for the additional delay demonstrated by the approved Time Impact Analysis. Time extensions shall be granted only if they are clearly demonstrated by the CONTRACTOR through the submittal, within seven (7) calendar days after the delay occurs, of a Time Impact Analysis which demonstrates the estimated impact on the end date of the Work; is based upon the updated Construction Schedule current as of the month the delay occurred; and demonstrates that the delay cannot be mitigated, offset, or eliminated through such actions as revising the intended sequence of Work or other means.

If a time extension if granted by the CITY, the updated schedule reflecting the change shall become the baseline and be reflected schedule and must be shown and compared on all subsequent schedule submittals.

Since float time within the Construction Schedule is jointly owned, it is acknowledged that CITY caused delays on the project may be offset by CITY caused time savings (e.g. critical path submittals returned in less time than allowed by the Contract or approval of substitution requests which result in a savings of time to the CONTRACTOR). In such an event, the CONTRACTOR shall not be entitled to receive a time extension or delay damages until all CITY caused time savings are exceeded and the Contract completion date is also exceeded.

F. If the initial schedule submitted shows completion of Work more than thirty (30) calendar days in advance of the Contract completion date, the ENGINEER may, at no cost to the CITY, decrease the Contract duration by issuance of a Change Order which changes appropriate Milestone Date(s) and the Contract completion date to the completion date reflected on the schedule. Any approved schedule, revision, or update having an early completion date shall show the time between the early completion date and the Contract completion date as "project float".

G. Comments made by the ENGINEER on the schedule during review will not relieve the CONTRACTOR from compliance with all requirements of the Contract. The ENGINEER may request that the CONTRACTOR and all major Subcontractors (defined herein as being any Subcontractor, Sub-Subcontractor, or Supplier with five (5) percent or more of the value of the Contract) participate in CONSTRUCTION SCHEDULE 01321-3
review of any schedule submission. All revisions shall be submitted within seven (7) calendar days after the ENGINEER’S review.

H. Two copies of an updated schedule shall be submitted to the ENGINEER for approval with the submittal of each CONTRACTOR'S monthly payment request or the monthly payment request will be withheld. For those activities started but not yet completed at the time of submittal, the updated schedule shall reflect the percentage complete, as agreed between the CONTRACTOR and the INSPECTOR, and an estimate of the remaining duration. The monthly update of the schedule shall include an updated bar chart with logic arrows or network diagram and include the same additional data as required by Section 1.C. If the CPM network option is used, the schedule shall be calculated using remaining durations and the progress override option. The monthly update shall also include a complete, hard copy list of all the changes made from the previously approved submittal. If the schedule is done using Primavera, use a Claim Digger report for the list of changes.

I. The submittal of an updated schedule which meets the requirements of this Section, accurately reflects the status of the Work (for all previously accepted activities), and incorporates all approved changes into the schedule, shall be a condition precedent to the processing of the monthly payment application. (Actual and/or forecast dates for status of additional submittal cycles shall be added without the prior approval of the Engineer.) Updated schedules shall also be submitted at such other times as the ENGINEER may direct. Upon approval of a Change Order or issuance of a notice to proceed with a change, the approved change shall be reflected in the next schedule update.

J. If completion of any part of the Work, delivery of equipment or materials, or submittal of CONTRACTOR submittals is behind schedule and will impact the end date of the Work, the CONTRACTOR shall submit a written recovery plan acceptable to the ENGINEER for completing the Work by the current Contract completion date, if requested by the ENGINEER.

K. As a condition precedent to the release of any retained funds, the CONTRACTOR shall, after substantial completion of the Work has been achieved, submit a certified, final schedule which accurately reflects the manner in which the project was constructed and includes actual start and completion dates for all activities on the schedule.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION PROGRESS PHOTOGRAPHY 01322-1
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY

1.1 GENERAL
A. Required: Provide photographs taken at the Jobsite at the specified stages of Contracted Work in accordance with provisions of this Section.

1. The Contractor shall provide the City with photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc).

2. Take first photographs just before CONTRACTOR starts any work operations at the Jobsite.

3. Take final photographs when all Contracted Work has been completed, regardless of time interval since previous photographs were taken.

1.2 SUBMITTALS
Except as otherwise directed by the ENGINEER, submit all photographs electronically on a CD/DVD organized by phase of construction and location.

1.3 QUALITY ASSURANCE
Photographs and prints to be of professional quality; clear, in focus, with high resolution and sharpness, and with minimum distortion.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION STATUS REPORTS 01323-1
SECTION 01323 CONSTRUCTION STATUS REPORTS

1.1 REQUIREMENTS
A. Daily Status Report
The Contractor shall complete a daily report indicating manpower, major equipment, subcontractors, unusual occurrences and etc., involved in the performance of the work. The daily report shall be completed on forms prepared by the Contractor and approved by the City and shall be submitted to the Project Manager at the conclusion of each work week.

The Contractor shall also have workers on the project sign in and out each day on the City of Redlands Daily Sign In Sheet which shall state the name, times in and out and the work performed by each worker on the project each day. The completed Daily Sign In Sheets shall be submitted to the City of Redlands Project Manager at the end of each work week. Failure to submit daily reports and daily sign in sheets to the Project Manager on a weekly basis will result in a possible and temporary suspension of work until reports are submitted.

B. Weekly Status Report
During the construction phase of the Work, the CONTRACTOR shall submit weekly written status reports to the ENGINEER and the INSPECTOR. The report shall contain a record of inspections and tests, not performed by CITY forces, for all Work accomplished subsequent to the previous report and shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

2. Inspections and tests, and location of inspections and tests that were made.

3. Results of inspections.

4. Reports of tests performed, including those specified, with the results of the tests, and acceptance criteria, including failures and remedial action to be taken. Test results, including all computations, shall be attached to the report form. Where test results cannot be completed by the time the report is submitted, a notation shall be made that the test was performed, including the approximate expected date that test results will be reported.

5. Report of any nonconforming items/activities. Nonconformance report forms designed solely for this purpose shall be utilized.

CONSTRUCTION STATUS REPORTS 01323-2

6. Results of inspections of material and equipment done upon their arrival at the Jobsite and prior to their incorporation into the Work. This includes, but is not limited to, compliance with approved submittals, damage, and proper storage requirements.

7. Offsite quality control activities.

8. Instructions received from the ENGINEER or INSPECTOR.

9. In all cases, the report must be verified and signed by the CONTRACTOR'S representative. The verification is to contain the statement that all supplies and materials incorporated in the Work are in compliance with the terms of the Contract except where noted.

C. 3 Week Look Ahead Schedule
During the construction phase of the Work, the CONTRACTOR shall submit 3 Week Look Ahead reports to the ENGINEER at the weekly progress meetings or as directed by the ENGINEER. The report shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

D. Miscellaneous Submittals
CONTRACTOR shall prepare a Daily Construction Report recording the following information concerning events at the job-site and submit original copies to the ENGINEER at weekly intervals for approval:

1. List of Subcontractors and Sub-Subcontractors at the site, types of works and job location.

2. Count of CONTRACTOR’S personnel at the site, name, type of work, hours completed and job location.

3. Construction equipments at the site.

4. High and low temperatures, general weather conditions.

END OF SECTION
SUBMITTALS 01330-1
SECTION 01330 SUBMITTALS

1.1 THE REQUIREMENT
A. The CONTRACTOR shall furnish a schedule and list of all required submittals to the ENGINEER, including required submittals by all Subcontractors.

B. Wherever called for in these Specifications or on the plans, or where required by the ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, two (2) hard copies and one electronic (PDF) copy of each submittal.

The term "submittal" as used herein shall be understood to include detail design calculations, design drawings, shop drawings, fabrication and installation drawings, erection drawings, lists, graphs, operating instructions, catalog sheets, data sheets, samples, and similar items. Unless otherwise required, said submittals shall be submitted to the ENGINEER at a time sufficiently early to allow review of same by the ENGINEER and to accommodate the rate of Construction Progress required under the Contract without delaying the Contract Work and with due regard for the possibility of resubmittals. All submittals shall be in English.

C. All design or shop drawings or other submittals shall be accompanied by a transmittal form for each submittal. Any submittal not accompanied by such a form may be returned, at the ENGINEER'S discretion, for resubmittal.

D. Normally, a separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. Transmittal of a submittal of various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates a review of the group or package as a whole. A multiple-page submittal shall be collated into sets, and each set shall be stapled or bound, as appropriate, prior to transmittal to the ENGINEER.

E. Shop Drawings shall show in detail the size, sections, and dimensions of all the member(s); the arrangement and construction of all connections and joints; all holes, straps, and other fittings required for attaching work and other pertinent details. When required, engineering computations shall be submitted. The CONTRACTOR shall be responsible for delivering reviewed copies of shop Drawings to all others whose work is dependent thereon. The CONTRACTOR shall maintain at the site of the Project, at all times, a complete file of approved Shop Drawings and manufacturers' data for this Project.

F. Except as may otherwise be provided herein, the ENGINEER will return prints of each submittal to the CONTRACTOR, with its comments noted thereon, within twenty (20) calendar days following their receipt by the ENGINEER. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal SUBMITTALS 01330-2
item. The CITY reserves the right to withhold moneys due the CONTRACTOR to cover additional costs of the ENGINEER'S review beyond the second submittal. Submittal will be returned to the CONTRACTOR with one of four (4) markings:

1. If a submittal is returned to the Contractor marked "NO EXCEPTIONS," formal revision and resubmission of said submittal will not be required.

2. If a submittal is returned to the Contractor marked "EXCEPTIONS NOTED," formal revision and resubmission of said submittal will not be required, unless specifically requested.

3. If a submittal is returned to the Contractor marked "RETURNED FOR CORRECTION," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

4. If a submittal is returned to the Contractor marked "NOT ACCEPTABLE," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

G. All Work for which Shop Drawings are required shall be performed in accordance with the reviewed and approved copies. Fabrication of an item shall not commence before the ENGINEER has reviewed the pertinent submittal and returned the copies to the CONTRACTOR marked either "NO EXCEPTIONS TAKEN," or "MAKE CORRECTIONS NOTED“. Revisions indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis for claims for extra work.

H. All CONTRACTOR submittals shall be carefully reviewed by an authorized representative of the CONTRACTOR prior to submission to the ENGINEER.

Each submittal shall be dated, signed, and certified by the CONTRACTOR as being correct and in strict conformance with the Contract Documents. No consideration for review by the ENGINEER of any CONTRACTOR’S submittal will be made for any items which have not been so certified by the CONTRACTOR. All noncertified submittals will be returned to the CONTRACTOR without action taken by the ENGINEER, and any delays caused thereby shall be the total responsibility of the CONTRACTOR.

I. Should the Shop Drawings or manufacturers data (for submittals required by the Standard Specifications or the specifications) show variations from the Contract requirements, the CONTRACTOR shall make specific mention of such variations in the letter of transmittal, in order that, if acceptable, suitable action may be taken for proper adjustment of the Contract; otherwise the SUBMITTALS 01330-3
CONTRACTOR will not be relieved of the responsibility for executing the work in accordance with the Contract Documents, and the approved submittals.

J. The ENGINEER’S review of CONTRACTOR’S submittal shall not relieve the CONTRACTOR of the entire responsibility for the correctness of details and dimensions and conformance to the Specifications. The CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in the submittal. Any fabrication or other work performed in advance of the receipt of accepted submittals shall be entirely at the CONTRACTOR’S risk and expense.

The CONTRACTOR shall be responsible for the dimensions and the design of adequate connections and details.

K. CONTRACTOR’S Coordination:

1. ENGINEER will return and will not review unrelated submittals.

2. The CONTRACTOR may be required to provide drawings, setting diagrams and similar information necessary for proper coordination of Contracted Work. Such data shall remain between the CONTRACTOR and CONTRACTOR’S Subcontractor and will not be reviewed by the ENGINEER unless specifically called for in the Contract Documents.

3. ENGINEER will not review any required Structural Shop Drawings, Structural Calculations, etc., not prepared or signed by a State of California licensed ENGINEER.

4. ENGINEER will return and will not review any submittal requiring coordination with other submittals until such other submittals or required information is received by the Consultant or ENGINEER.

L. CONTRACTOR’S Submittals: CONTRACTOR’S submittals required for performance of Contracted Work, shall include, but are not limited to, the following:

1. Schedule of Values for all Lump Sum items within the Proposal.

2. Construction Schedule and Notification to ENGINEER of completion of each milestone or percentage increment of the Work as required.

3. Submittal Schedule

4. Daily Construction Reports

5. Shop Drawings and Structural Calculations.

6. Manufacturer’s Data and Specifications.

SUBMITTALS 01330-4

7. Samples

8. Templates

9. Certificate of Compliance

10. Construction Photographs

11. Substitutions

12. Record Drawings and Record Project Manual

13. Operation & Maintenance Manuals

14. Stock Materials, Spare parts, tools

15. Material Testing Results

16. Maintenance Logs and Maintenance Schedule.

M. CONTRACTOR shall conform to the provisions of the Contract Document and as may be specifically directed by the ENGINEER.

1. Preparation and processing of submittals shall be coordinated with Contracted Work operations, which include fabrication, purchasing and delivery of work items so as not to delay Contracted Work operations.

2. In each copy of the Submittal, mark every applicable material, product, equipment, manufacturer’s data, product information, color samples, rating or values, part and model numbers, etc. by red color circle. Each of the submittal items must be clearly distinguishable from other unrelated or similar items listed in the Manufacturer’s Catalog or Technical Specifications, Manuals, etc.

N. Coordination and Submittals:

1. Carefully review and coordinate all aspects of each item being submitted.

2. Carefully review contract drawings and technical sections, verify all work as laid out or indicated meeting the applicable codes and standards.

3. Ensure ample time for reviewing and processing of the submittals by the CITY or other authorized agencies, delays resulting from improper and untimely submittals shall be the responsibility of the CONTRACTOR.

SUBMITTALS 01330-5

4. Verify that all such submittal items conform to the Project Manual requirements noted in the Technical Sections.

5. Verify all site conditions and provide all required dimensions and measurements in Shop Drawings.

6. Where necessary, review the CITY’S comments, make changes and resubmit to local governing agencies for approval. Furnish the ENGINEER copies of the approved plans or drawings for review.

O. CONTRACTOR shall affix to each submittal, the CONTRACTOR’S signature certifying that required coordination has been performed and include on an attached label for processing and recording action taken, noting the following:

1. Name of the Project

2. Date of the Submittal

3. Name and address of Consultant

4. Name and address of the CONTRACTOR

5. Name and address of the Subcontractor(s)

6. Name and address of the Supplier

7. Name and address of the Manufacturer

8. Reference to Specification Section Number and Title

9. Reference to Drawing Sheet Number and detail(s)

10. Submittal Number

11. Priority Number and expected return date.

END OF SECTION
SUBMITTALS 01330-6

THIS PAGE INTENTIONALLY LEFT BLANK
SUBMITTALS 01330-7

SUBMITTALS 01330-8

STORMWATER POLLUTION PREVENTION PLAN 01571-1
SECTION 01571 STORMWATER POLLUTION PREVENTION PLAN
PART 1 - GENERAL
This project is subject to the requirements of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009-DWQ, CAS000002, and all amendments. All permit related documents can be located at the State Water Resources Control Board (SWRCB) website at www.waterboards.ca.gov. This project lies within the boundaries of the Santa Ana Regional Water Quality Control Board (RWQCB). The project is also covered by the municipal MS4 permit, Santa Ana-Order No. R8-2010-0036. Guidance manuals applicable to this project are the California Best Management Practices Handbooks found at www.cabmphandbooks.com.

The Contractor shall be responsible for complying with the SWPPP and all laws, codes, ordinances, and requirements of the governing agencies regarding the discharge of pollutants, pollution control devices, and any other related stormwater and non-stormwater requirements for this project, including but not limited to reporting, sampling, and amendments.

The Contractor shall have the necessary training and certifications to implement the SWPPP, conduct inspections and maintain the required water pollution control practices. See Section “QUALIFIED SWPPP PRACTITIONER (QSP)”.

The Contractor shall follow all requirements of the prepared job specific Storm Water Pollution Prevention Plan (SWPPP) including the Construction Site Monitoring Program Requirements (CSMP). The contractor shall provide a Qualified SWPPP Practitioner (QSP) to implement all requirements of the SWPPP. The QSP shall be responsible for monitoring and sampling as required by the CSMP.

Approval of the SWPPP must be completed prior to the start of construction activity. However, the contract time will commence.

PART 2 - STORMWATER POLLUTION PREVENTION PLAN PREPARATION If required under Order No. 2009-0009-DWQ, CAS000002, or its amendments, the Contractor shall prepare a SWPPP for the project. The SWPPP provides the general stormwater approach for the project and the minimum necessary BMPs. The contractor shall provide a Qualified SWPPP Practitioner (QSP) for this project and submit to the City copies of the required certifications or registrations for the QSP prior to SWPPP approval.

The California Storm water Quality Association (CASQA) has prepared a SWPPP template for use with Order No. 2009-0009-DWQ, CAS000002. The SWPPP template provides the general storm water approach for the project and the minimum necessary BMPs. The SWPPP template is not to be a considered a final and complete document until it has been completed and approved by a Qualified SWPPP Developer (QSD). The QSD is expected to include in the updated Final STORMWATER POLLUTION PREVENTION PLAN 01571-2
SWPPP necessary details pertaining to the methods and scheduling of construction and any additional necessary BMPs, based on the project approach.

The QSD shall use the CASQA SWPPP template for preparation of the SWPPP. The Caltrans SWPPP template shall not be used.

Within 5 days of the Notice to Proceed, Contractor shall submit two (2) hardcopies of the draft Storm Water Pollution Prevention Plan (SWPPP) for review. SWPPP review shall be in accordance with the requirements set forth in Section 01330 of the General Requirements. Once all of the noted revisions have been made and the SWPPP is complete for submittal to the State, two (2) final signed hardcopies and one (1) electronic copy of the SWPPP must be submitted to the Engineer for acceptance. The Contractor shall keep one copy of the approved SWPPP and approved amendments at the project site. The SWPPP shall be made available upon request by a representative of the City of Redlands, the Regional Water Quality Control Board or the State Water Resources Control Board. Requests made by the public or other third-parties for review of the SWPPP shall be directed to the Project Engineer. The Contractor shall notify the Engineer immediately when regulatory agencies request to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor’s records pertaining to the water pollution control work.

Contractor shall immediately send all correspondences, notices of violation, enforcement actions or proposed fines, issued by a regulatory agency, to the Engineer.

The SWPPP shall be updated or amended as necessary or as required for compliance purposes.

All updates to the SWPPP shall be per the guidelines contained therein. A copy of the SWPPP must be kept at the project site at all times. In the case of a linear construction project (water, sewer, street), where no field office has been established, the copy of the SWPPP shall be kept by the contractor’s foreman in the vicinity of the actual construction and made available within thirty (30) minutes of request. The SWPPP shall be made available upon request by a City Inspector, a representative of the Regional Water Quality Control Board or the State Water Resources Control Board. Requests made by the public or other third parties for review of the SWPPP shall be directed to the City Engineer.

PART 3 - SWPPP IMPLEMENTATION
Unless otherwise specified, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting, maintaining, removing, and disposing of the water pollution control devices; and practices specified in the SWPPP, its amendments, or by the City Inspector. Unless otherwise directed by the City Engineer, the Contractor's responsibility for SWPPP implementation shall continue throughout temporary suspensions of work, regardless of reason, unless specified otherwise in writing by the City Engineer. Requirements for installation, construction, inspection, maintenance, removal, and disposal of water pollution control devices and practices shall conform to the requirements in the SWPPP and these special provisions.

The National Weather Service (http://www.srh.noaa.gov/) weather forecast shall be monitored and used by the Contractor on a daily basis. If there is a forecast of 50% or greater probability of precipitation in the project area, the necessary water pollution control devices, plans and practices shall be deployed prior to the onset of the precipitation and immediate notice provided STORMWATER POLLUTION PREVENTION PLAN 01571-3
to the City Engineer. The contractor’s QSP shall be required to prepare and submit a Rain Event Action Plan (REAP), if required, any time the probably of rainfall is 50% or greater.

For the purposes of erosion and sediment control, disturbed soil areas shall be considered active whenever the soil disturbing activities have occurred, continue to occur or will occur during the ensuing 14 days. Non-active areas shall be protected as prescribed in the General Construction Permit within 14 days of cessation of soil disturbing activities or prior to the onset of precipitation, whichever occurs first.

If the City Inspector finds the contractor is not in compliance with the SWPPP or any other applicable pollution control laws or regulations, the City Inspector shall direct the contractor to correct the violation. The Contractor shall immediately take measures to correct the violation or notify the City Engineer in writing why correcting the violation immediately is not possible and provide a timetable by which the violation will be corrected. The City Engineer may accept the timetable, reject it or modify it. Under no circumstances will the contractor submit a timetable that exceeds the duration of construction in the immediate area. If the Contractor fails to correct the identified violation by the date agreed upon or prior to the onset of precipitation, the project shall be in nonconformance with these specifications and subject to the remedies as described in Section “LEGAL RELATIONS AND RESPONSIBILITY”.

Installing, inspecting and maintaining water pollution control practices on areas outside the City of Redlands right of way, not specifically arranged and provided for by the City of Redlands in the execution of this contract, will not be paid for without prior written approval.

No work required by regulatory agencies, and for which the Contractor would request additional compensation from the City, shall be started without prior approval from the City Engineer.

PART 4 - MAINTENANCE
To ensure the proper implementation and correct functioning of water pollution control devices and practices, the Contractor shall assign a Qualified SWPPP Practitioner (QSP) to regularly inspect and maintain the construction site’s water pollution control devices and practices as identified in the SWPPP. The frequency of the inspections shall be in accordance with the SWPPP. In the event of multiple consecutive violations, the City Engineer may increase the frequency of the inspections. These additional inspections shall be at the Contractor’s expense based on the current adopted resolution establishing such fees.

The QSP/Contractor shall document the inspections findings, using photographs and a written narrative, and if necessary, make the necessary corrections to the water pollution control practices or devices. One copy of each site inspection record shall be submitted to the City Engineer within 5 working days of completing the inspection. The QSP/Contractor shall submit one copy of each Rain Event Action Plans (REAP), when required, within 12 hours of anticipated precipitation event. The QSP/Contractor shall also submit one copy of each monitoring/sampling report, when required, within 24 hours of receiving the results. The contractor shall be responsible for all expenses incurred in the reporting process.

STORMWATER POLLUTION PREVENTION PLAN 01571-4
PART 5 - REPORTING REQUIREMENTS - DISCHARGE
If the Contractor identifies discharges leaving the construction site or flowing into drainage systems or surface waters in a manner causing, or potentially causing, a condition of pollution, or if the project receives a written notice or order from a regulatory agency, the Contractor shall immediately inform the City Engineer. The Contractor shall submit a written report to the City Engineer in less than 24 hours of the discharge event, notice, or order. The report shall include the following information:

A. The date, time, location, nature of the operation, and type of discharge, including the cause or type of the notice or order Contractor received.

B. The water pollution control practices deployed before the discharge event, or prior to receiving the notice or order.

C. The date of deployment and type of water pollution control practices deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent reoccurrence.

D. An implementation and maintenance schedule for affected water pollution control practices.

The contractor shall also submit any reports required by the SWPPP or the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities to the appropriate agencies. The contractor shall be responsible for all expenses incurred in the reporting process. Any required sampling shall be done by the contractor or his QSP in compliance with the SWPPP.

PART 6 - REPORTING REQUIREMENTS – ANNUAL REPORT and NOTICE OF

TERMINATION
The contractor shall be responsible for preparing the Annual Report. The Annual report shall be prepared per Section XVI. ANNUAL REPORTING REQUIREMENTS of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009-DWQ, CAS000002. The Annual Report must be prepared by or under the direction of a QSP. 1) The contractor or QSP shall prepare an Annual Report no later than August 15th of each year.
2) The contractor or QSP shall certify each Annual Report in accordance with the Special Provisions.
3) The contractor or QSP shall retain an electronic or paper copy of each Annual Report for a minimum of three years after the date the annual report is filed.

STORMWATER POLLUTION PREVENTION PLAN 01571-5
4) The contractor or QSP shall include storm water monitoring information in the Annual Report consisting of:
a) A summary and evaluation of all sampling and analysis results, including copies of laboratory reports;
b) The analytical method(s), method reporting unit(s), and method detection limit(s) of each analytical parameter (analytical results that are less than the method detection limit shall be reported as "less than the method detection limit"); c) A summary of all corrective actions taken during the compliance year; d) Identification of any compliance activities or corrective actions that were not implemented;
e) A summary of all violations of the General Permit;
f) The names of individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements;
g) The date, place, time of facility inspections, sampling, visual observation (inspections), and/or measurements, including precipitation (rain gauge); and h) The visual observation and sample collection exception records and reports specified in Attachments C, D, and E.
5) The contractor or QSP shall provide training information in the Annual Report consisting of:
a) Documentation of all training for individuals responsible for all activities associated with compliance with this General Permit; 2009-0009-DWQ 40 September 02, 2009 Order 2009-0009-DWQ 41 September 02, 2009
b) Documentation of all training for individuals responsible for BMP installation, inspection, maintenance, and repair; and
c) Documentation of all training for individuals responsible for overseeing, revising, and amending the SWPPP.

A copy of the Annual Report shall be submitted to the City no later than 9 A.M. each August 15th. In the event August 15th is a Friday, Saturday, or Sunday, the report shall be submitted no later than 5 P.M. on the Thursday prior to August 15th. If the project is completed prior to August 1st, regardless of when the project started, the Annual Report is due within two weeks of project completion. The contractor shall submit two hard copies of the annual report and one digital copy in PDF format on compact disc (CD).

STORMWATER POLLUTION PREVENTION PLAN 01571-6
Failure to submit the Annual report within the timeframes specified will result in progress payments and/or retention release being delayed and/or withheld. The City of Redlands, at its discretion, may complete the annual report based on records provided by the contractor. The contractor shall reimburse the city the full cost of creating the Annual Report along with an administrative fee not to exceed 1.7 times the total cost. The contractor shall also be liable for any fines or judgments levied by the Regional Water Quality Control Board against the City of Redlands as a result of the contractors failure to provide the annual report within the time frames listed above.

Under no circumstances does the submittal of a copy of the Annual Report to the City of Redlands relieve the contractor of his responsibility to maintain the Annual Report records for a minimum of three years after the date of submittal.

The contractor shall be responsible for preparing the Notice of Termination. The Notice of Termination shall be prepared within 30 days of the cessation of construction and shall meet all the requirements of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board.

Order No. 2009-0009-DWQ, CAS000002. The Notice of Termination must be prepared by or under the direction of a QSP.

Along with submitting the Notice of Termination to the City of Redlands, the QSP shall submit one (1) hard copy and one (1) electronic copy of the Storm Water Pollution Prevention Plan (SWPPP), including all inspection reports, photographs and other documents as required by the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009- DWQ, CAS000002, to the Engineer.

PART 7 - WATER POLLUTION BEST MANAGEMENT PLAN (BMP) BUDGET The Contractor shall submit a completed Water Pollution BMP budget, which itemizes the BMPs for water pollution control work. The Contractor shall identify items, quantities, and values for all water pollution control work. The Water Pollution BMP budget shall provide a cost breakdown for the water pollution control work based on BMP quantity, unit cost, and total amount.

The Contractor shall be responsible for the accuracy of the quantities and values used in the Water Pollution BMP budget. Partial payment for the item of water pollution control will not be made until the Water Pollution BMP budget is approved by the Engineer. Overhead and profit, except for time-related overhead, shall be included in the individual line items listed in the Water Pollution BMP budget. Line item quantities indicated in the Water pollution BMP budget in this section shall be considered project-specific minimums. All the BMPs listed in the Water Pollution Control BMP budget can be referenced in the CASQA Construction BMP Handbook.

PART 8 - PAYMENTS AND PENALTIES
STORMWATER POLLUTION PREVENTION PLAN 01571-7
The Water Pollution BMP budget shall include full compensation for furnishing labor, materials, tools, equipment and incidentals for doing all the work involved in reviewing, updating, and implementing a Storm Water Pollution Prevention Plan, including installing, constructing, removing and disposing of water pollution control devices and practices, and non-stormwater management and waste management and no additional compensation will be allowed, unless there is a separate prior approval in writing by the City Engineer.

It shall be understood that the City of Redlands and/or the City Engineer’s acceptances does not relieve the Contractor of his/her full responsibility, legally and/or financially, to repair damages resulting from inadequacy and/or insufficiency of water pollution control devices and practices that were installed by the Contractor during construction activity.

PART 9 - LEGAL RELATIONS AND RESPONSIBILITY
The City Inspector may use any of the following measures if violations are not corrected in a timely manner or if the violation may present a danger to public health or to the environment; notices of correction or violation, stop work orders, citations, and using City staff or third party contractors to correct the problem. In the event that the above measures do not resolve the issues, the City Inspector shall inform the State Water Resources Control Board (SWRCB) of the violation and request their intervention.

The Contractor shall be solely responsible for penalties assessed or levied on the Contractor or the City of Redlands as a result of the Contractor’s failure to comply with the provisions in this section, including but not limited to, compliance with the applicable provisions of the Permits, the Manuals, and Federal, State and local regulations and requirements as set forth, therein.

Penalties shall also include payment made or cost incurred in settlement for alleged violations of the Permits, the Manuals, or applicable laws, regulations or requirements, Costs incurred could include sums spent instead of penalties, in mitigation or to remediate or correct violations. This shall apply regardless of the source issuing the penalties.

In the event a stop work order has been issued, the days passing between the discovery of the violation until the violation has been resolved and the stop work order has been lifted, shall be considered “working” days and shall not negate any claims by the City of Redlands for liquidated damages.

If the Contractor fails to correct violations immediately or within the time table established with the City Engineer, the City of Redlands may elect to use City staff or a third party to bring the project into compliance. The Contractor shall be responsible for the cost incurred by the City of Redlands when using City staff or a third party to bring the project into compliance. The City of Redlands reserves the right to add an additional fifteen (15) percent to the costs to cover administrative expenses.

PART 10 - RETENTION OF FUNDS
STORMWATER POLLUTION PREVENTION PLAN 01571-8
Notwithstanding any other remedies authorized by law, the City of Redlands may retain money due the Contractor under the contract, in an amount determined by the City, up to and including the entire amount of penalties proposed, assessed or levied as result of the Contractor’s violation of the Permits, the Manuals, or Federal or State law, regulations or requirements. Funds may be retained by the City until final disposition has been made as to the Penalties. The Contractor shall remain liable for the full amount of penalties until such time as they are resolved with the entity seeking the penalties.

When a regulatory agency or third party identifies a failure to comply with the Permits and modifications, thereto, the Manuals, or other Federal, State or local requirements, the City of Redlands may retain money due to the Contractor, subject to the following:

A. The amounts retained, due to Contractor’s failure to conform to the provisions in this section, will be released for payment on the next monthly estimate for partial payment providing the corrections have been implemented and maintained and when water pollution has been adequately controlled, as determined by the City Engineer.

During the estimated period that the Contractor fails to conform to the provisions in this section, the City may retain an amount equal to 25 percent of the estimated value for the contract work performed.

PART 11 - QUALIFIED SWPPP PRACTITIONER (QSP)
The General Construction Permit requires a Qualified SWPPP Practitioner (QSP) to oversee implementation of the BMPs and to ensure proper project oversight. Any contractors bidding and/or awarded a contract for any projects for the City of Redlands subject to the provisions of the General Permit shall employ a QSP. Prior to being awarded a construction contract, the successful bidder shall submit the name of the QSP to the City or Redlands for approval.

The QSP shall be responsible for the elimination of all unauthorized discharges and the preparation and submittal of an annual compliance evaluation report.

END OF SECTION
CONSTRUCTION INFORMATION SIGNS 01581-1
SECTION 01581 CONSTRUCTION INFORMATION SIGNS

1.1 THE REQUIREMENT
The City shall provide the Contractor with all required construction information signs for the project. The signs shall be installed at the locations noted in the plans, if included, or as otherwise directed by the Engineer. If the project consists of numerous sites, the construction information signs shall be relocated to each site as work progresses. The construction signs shall be installed the same day work commences on any construction site. If the sign is not installed prior to construction work beginning at a subsequent site, the City will install the information signs at the Contractor’s expense.

The installation of each sign shall be the responsibility of the contractor to include mounting posts, hardware and any related incidentals to ensure the sign is placed in a safe and secure manner. For any sign required for multiple site projects, where the sign is frequently relocated and not anticipated to be installed in the ground on posts, the Contractor shall provide a Type III barricade for mounting. The contractor shall obtain approval from the Engineer following installation of the construction information sign. If the signs are installed in the ground with posts, proper vertical clearance shall be provided. The minimum vertical clearance shall be six feet within a parkway area and seven feet within the sidewalk.

The construction information sign shall remain visible at all times. The contractor shall replace stolen signs at their expense and maintain the signs, ensuring all graffiti, soil, paint, etc. is removed from the sign immediately. Upon completion of the project, each sign shall be removed and returned to the City. If the sign is not returned to the City at the completion of the project in the original condition, the cost of the sign shall be withheld from the final progress payment.

The Contractor shall notify Underground Service Alert (Dig alert) at least 2 working days, but not more than 14 calendar days, prior to performing any excavation.

Full compensation for furnishing all labor, equipment, materials, and tools required to perform the tasks noted above, and as ordered by the Engineer, shall be considered as being included in the various Contract items of work and no separate or additional compensation will be allowed therefore.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

MOBILIZATION 01721-1

SECTION 01721 MOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Mobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in mobilization (in advance of construction operations and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no mobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for mobilization.

Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Obtaining all permits, licenses, insurance, and bonds. Providing copies to the ENGINEER.

2. Moving onto the Jobsite all of CONTRACTOR’S plant and equipment as required.

3. Erecting temporary buildings and other construction facilities.

4. Installing temporary construction power and wiring.

5. Establishing fire protection system for its temporary facilities.

6. Developing construction water supply.

7. Providing field office trailers for the CONTRACTOR, complete with all specified equipment, furnishings, utility services and required approvals from the CITY.

8. Providing sanitary facilities or connecting to onsite sanitary facilities as specified.

9. Providing for potable water facilities as specified. This includes a means by which all on site CONTRACTOR, Subcontractor or supplier personnel can wash their hands with soap.

10. Arranging for, and erection of, CONTRACTOR’S work and storage yards and sheds.

MOBILIZATION 01721-2

11. Submitting all required Subcontractor insurance certificates and bonds.

12. Posting all CAL/OSHA required notices and establishment of safety programs.

13. Furnishing of Construction Schedule, Contract Price Breakdown and Submittal Schedules.

14. Erecting all temporary fencing, including removal and disposal of existing temporary fencing.

END OF SECTION
SURVEYING 01722-1
SECTION 01722 SURVEYING
PART 1 - GENERAL
A. General

1. The CONTRACTOR shall be responsible for all surveys required to layout the Work and for the accuracy of all survey work for construction.

The CONTRACTOR shall include the cost of all such survey work in their Bid. The CONTRACTOR shall have all construction surveying performed by a `Licensed Land Surveyor' or a `Civil Engineer’ registered by the State of California to perform such work. The ENGINEER reserves the right to verify all survey work done by the CONTRACTOR.

2. The CONTRACTOR shall preserve the initial survey control points for the duration of their usefulness. Monumentation that is subject to disturbance or destruction shall be located and referenced prior to construction and relocated and referenced if necessary after construction, in accordance with the following requirements.

B. Construction Surveys

1. The CONTRACTOR shall provide all reference stakes and form checks necessary for construction and inspection of improvements. All construction staking shall be documented in cut sheets and provided to the ENGINEER. This staking may include but is not limited to: removals, joins, rough grade, slope, utilities, storm drains, sewers, curbs, walks, paving, wall and building stakes; and any other staking necessary for construction and inspection.

C. Reference Or Grade Stakes

1. A reference or grade stake shall be set for each grade change or angle point shown on the plan, standard plan, and shop drawing, in addition to the normal staking interval.

D. Form Checks

1. Forms shall be checked when durable points may be disturbed, removed, or are impractical to be used to verify the design location. The measured location shall be recorded in the survey field notes. All variations from the plan location shall be brought to the attention of the ENGINEER.

E. Staking Intervals And Offset Stake Lines
SURVEYING 01722-2

1. All staking intervals shall be in accordance as directed by the Engineer.

Stake lines shall be set at an offset distance from the improvement to ensure proper grade, station, and alignment.

F. Utility Stakes

1. The CONTRACTOR shall provide stakes for all utilities, public or private, that require location or relocation, unless otherwise stated.

G. Additional Survey Work

1. The CONTRACTOR may be required to furnish additional survey work, such as profiles, restakes, Change Orders, etc., at the request of the ENGINEER or the INSPECTOR.

H. Accuracy

1. The CONTRACTOR shall use appropriate surveying methods to obtain the following standards: For fixed works (i.e. cast-in-place concrete; asphalt pavement, pipes and drains; and other items determined by the ENGINEER) the following survey standards shall be used. The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.015 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.015 foot or less.

2. For excavation purposes, the following survey standards shall be used.

The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.1 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.1 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that semimajor axis of the 95% error ellipse is ±0.1 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.1 foot or less.

I. Survey/Inspector

1. The CONTRACTOR shall provide to the INSPECTOR those
measurements and control points necessary to determine the location and conformance to the plan, line, and grade of the improvements necessary for inspection purposes.

SURVEYING 01722-3
J. Survey Notes

1. The CONTRACTOR shall supply and keep notes on CITY standard format note sheets. The ENGINEER may request copies of, and otherwise review, survey notes at any time during the construction phase of the Project. Upon completion of the Project, the original survey notes shall become the property of the CITY and shall be delivered to the

ENGINEER
PART 2 – MONUMENT PRESERVATION GUIDELINES
A. New & Reconstruction Projects

1. Prior to Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record above or below the surface, within the road right-of-way. It is suggested that this search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument is required.
c. The survey crew shall properly reference all found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item c, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.

2. After Construction and Prior to Notice of Completion a. All covered and disturbed monuments shall be reset with the same or more durable type of monument as the original, in the surface of the construction.

Key monuments shall be a minimum 1” inside diameter iron pipe of appropriate length.
b. A monument box or other protective structure is recommended to be placed around key monuments (section corners, quarter section corners). c. The authorized surveyor shall properly completes a Corner Record or Record of Survey for all set monuments with a change in character, including tag number, and submit it to the County Surveyor for review, signature and filing.

A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.

SURVEYING 01722-4
B. Overlay Projects

1. Prior To Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record and on the surface of the road. It is suggested the search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument within 2” of the road surface is recommended.
c. The survey crew shall properly reference found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item 3, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.

2. After Construction and Prior to Notice of Completion a. All covered or disturbed monuments and surface monuments are reset in the new road surface, or a new monument is set in the new road surface above the buried one.
b. All existing monument boxes will be adjusted to grade or replaced, as appropriate.
c. A monument box or other protective structure should be placed around key monuments (section corners, quarter section corners).
d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for all set monuments and existing monuments with a change in character, including tag number and submits it to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.

C. Slurry Seal Projects

1. Prior To Construction
SURVEYING 01722-5
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies furnished to for the survey crew.
b. All monument boxes shall be located and steps taken to ensure that the survey monuments inside are readily accessible upon completion of the project. c. The survey crew shall diligently searches for survey monuments on the surface of the roadway, and identify said monuments recovered in the field to ensure that they will be protected. The survey crew shall inventory the monuments recovered in the field in a manner that allows for their recovery and inspection after construction.

2. After Construction and Prior to Notice of Completion a. All monument boxes shall be inspected, and appropriate action taken when needed, to ensure that the survey monuments inside are readily accessible. b. The survey crew shall review the inventory of found monuments by field inspection to ensure that all survey monuments are clean and exposed. Those monuments covered after construction is completed shall be uncovered.

D. Monument Tie Preservation

1. Prior To Construction
a. All existing survey monument ties within the scope of the project shall be researched and identified prior to construction. Surveyor may obtain existing tie sheets from the City as available.
b. If it is determined that all ties for a survey monument may be disturbed during construction, the Surveyor shall relocate the monument ties prior to construction, within improvements that will not be disturbed, and file the revised tie sheet with the City. A minimum of three tie points should reference each centerline monument, whenever possible

2. After Construction and Prior to Notice of Completion a. If it is determined that the result of construction will not disturb all survey monument ties for a specific monument, the Surveyor shall replace all monument ties disturbed during construction per the following guidelines:

i. Monument ties shall be placed during the finishing process of the concrete improvements.
ii. Monument ties shall be set below the elevation of the adjacent top of curb to provide protection from any future cleaning, maintenance or work around the tie.
iii. A minimum of three tie points should reference each centerline monument, whenever possible.

SURVEYING 01722-6
b. Once the construction is complete, the Surveyor shall prepare a revised tie sheet, and file with the City for all monument ties disturbed during the construction.

END OF SECTION
POTHOLING 01732-1
SECTION 01732 POTHOLING

1.1 THE REQUIREMENT
A.The CONTRACTOR shall conduct exploratory excavations by potholing to verify or to discover the actual locations and the size of existing underground utilities and improvements. The CONTRACTOR shall take care not to damage existing facilities during potholing operations. Any utility or existing facility (including those located by Underground Service Alert - USA) within 3 feet of any trench or excavation shall be potholed prior to starting the contract work in the vicinity.

Potholing shall be done in each given area where excavation work is to occur at least fourteen (14) calendar days in advance of any excavation or construction in that area, to avoid possible delay in the progress of the Work.

B.Potholing shall consist of excavations at the locations of utilities or other underground facilities indicated on the Drawings, located by USA, or as directed by the ENGINEER. All costs of potholing operations for the utilities indicated on the Drawings shall be included in the CONTRACTOR’S Bid.

C.If an allowance for “Additional Potholing” has been established and included in the SCHEDULE OF WORK AND PRICES, this allowance shall only be used to reimburse the CONTRACTOR for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER. If the total cost of the Work directed under the Additional Potholing allowance differ from the amount set forth in the SCHEDULE OF WORK AND PRICES, the Contract Price shall be adjusted by a Change Order. The adjustment shall be the difference between the total actual costs and the amount included in the Bid, as an additional amount due to the CONTRACTOR or a credit to the CITY, as appropriate.

D.In addition to the potholes indicated on the Drawings, or directed by the ENGINEER, the CONTRACTOR may opt to do further potholing deemed necessary at no additional cost to the CITY.

E.Potholing operations shall conform to all applicable requirements as to sidewall slopes, sheeting and shoring, and all other excavation and trenching provisions specified herein.

F.Potholes shall be identified and protected in accordance with the Engineer’s instructions, the California Manual on Uniform Traffic Control Devices (MUTCD) and Work Area Traffic Control Handbook (WATCH) Standards.

G.The CONTRACTOR’S proposed method of potholing and schedule for potholing shall be submitted to the ENGINEER for approval, at least thirty (30) days prior to the commencement of operation. Any utilities damaged during potholing shall POTHOLING 01732-2
be immediately reported to the ENGINEER and INSPECTOR and repairs made immediately in accordance with the specifications.

H.A complete log of all potholes shall be kept by the CONTRACTOR, showing specific locations and dimensions of trenches. The log shall be verified by the INSPECTOR prior to the backfilling of the potholes. The verified log will be submitted to the ENGINEER and the INSPECTOR within two (2) working days after completion of potholing in each area. Payment for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER will not be made unless these potholes are listed on the verified log.

I.The CONTRACTOR shall record the coordinates, elevations and dimensions of all utilities and improvements verified or discovered by potholing. The records shall be submitted to the ENGINEER within two (2) working days after the completion of potholing in each area. The records shall also include dates of the potholing operations and any additional discovered information or pertinent data.

J.Upon completion of potholing in each area, and after verification of the logs by the INSPECTOR, potholes shall be immediately backfilled and compacted in accordance with the specifications, or restored as directed by the ENGINEER.

END OF SECTION
DEMOBILIZATION 01740-1
SECTION 01740 DEMOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Demobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in demobilization (upon completion of all contract work and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no demobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for demobilization.

Demobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Moving off of the Jobsite all of CONTRACTOR’S plant and equipment as required.

2. Dismantling and removing all temporary buildings and other construction facilities.

3. Dismantling and removing all temporary construction power and wiring.

4. Removing all sanitary facilities from the work site.

5. Remove all waste, debris, and rubbish caused by construction operations within the work area, adjacent properties and public roads.

6. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the CONTRACTOR’S Bid.

7. Dismantling and removal of all temporary fencing.

8. Provide City with all required As-Built drawings.

9. All required Corner Records have been filed with the County and all copies provided to the City per Section 01722 Surveying.

10. All items noted within the final inspection (“Punchlist”) have been completed to the satisfaction of the City.

DEMOBILIZATION 01740-2

11. All project photographs as required within Section 01322 Construction Progress Photography have been provided.

12. Notice of Completion (NOC) will not be filed until all work is complete per this Section 01740.

END OF SECTION

TECHNICAL SPECIFICATIONS

THIS PAGE INTENTIONALLY LEFT BLANK

PROTECTING EXISTING UNDERGROUND UTILITIES 02222-1

SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES PART 1 - GENERAL
A. Description
This section includes materials and procedures for protecting existing underground utilities.

B. Related Work Specified Elsewhere

1. General Conditions
PART 2 - MATERIALS
A. Replacement in Kind
Except as indicated below or as specifically autho rized by the Owner's Representative, reconstruct utilities with new material of the same size, type, and quality as that removed.

B. Vitrified Clay Sewer Pipe and Couplings
For sewer pipe 8 inches in diameter or under, replacement shall consist of plain -end pipe conforming to ASTM C 700. Compression couplings shall conform to ASTM C 594, band seal couplings or equal. Use at least two lengths of pipe in crossing the trench section as shown on the details in the drawings.

PART 3 - EXECUTION
A. General

1. Replace in kind street improvements, such as curbs and gutters, barricades, traffic islands, signalization, fences, signs, etc., that are cut, removed, damaged, or otherwise disturbed by the construction.

2. Where utilities are parallel to or cross the construction but do not conflict with the permanent work to be constructed, follow the procedures given below and as indicated in the drawings. Notify t he utility owner 48 hours in advance of the crossing construction and coordinate the construction schedule with the utility owner's requirements. For utility crossings not shown in the drawings, refer to the General Conditions and the instructions of the Owner's Representative for guidance.

PROTECTING EXISTING UNDERGROUND UTILITIES 02222-2

3. Determine the true location and depth of utilities and service connections which may be affected by or affect the work. Determine the type, material, and condition of these utilities. In order to provide sufficient lead time to resolve unforeseen conflicts, order materials and take appropriate measures to ensure that there is no delay in work.

4. Expose utilities 1,300 feet in advance of the pipeline construction.

B. Procedures

1. Protect in Place: Protect utilities in place, unless abandoned, and maintain the utility in service, unless otherwise specified in the drawings or in the specifications.

2. Cut and Plug Ends: Cut abandoned utility lines and plug the ends. Plug storm drains and sewers with an 8 -inch wall of brick and mortar. Cap waterlines with a cast -iron cap or install a 3 -foot-long concrete plug. Dispose of the cut pipe as unsuitable material.

3. Remove and Reconstruct: Where so indicated in the drawings or as required by the Owner's Representative, remove the utility and, after passage, reconstruct it with new materials. Provide temporary service for the disconnected utility.

C. Compaction

1. Utilities Protected in Place: Backfill and compact under and around the utility so that no voids are left.

2. Utilities Reconstructed: Prior to replacement of the utility, backfill the trenc h and compact to an elevation 1 foot above the top of the ends of the utility. Excavate a cross trench of the proper width for the utility and lay, backfill, and compact.

3. Alternative Construction --Sand Slurry: Sand slurry consisting of one sack (94 pounds) of portland cement per cubic yard of sand and sufficient moisture for workability may be substituted for other backfill materials to aid in reducing compaction difficulties. Submit specific methods and procedures for the review of the Owner's Representative prior to construction.

4. The protection of the utility during construction.

D. Thrust Blocks on Waterlines
Note that restrained joints is the required method of controlling thrust restraint on this project except where shown on the plans or as approved other wise by the City of Redlands.

1. The Contractor's attention is called to thrust blocks delineated in the drawings for waterlines throughout the project whose thrust is in the direction of the new excavation and, therefore, may be affected by the construction. These waterlines are PROTECTING EXISTING UNDERGROUND UTILITIES 02222-3

owned and operated by the Owner. Protect thrust blocks in place or shore to resist the thrust by a means approved by the Owner and reconstruct. If the thrust blocks are exposed or rendered to be ineffective in the opinion of the Owner's Representative, reconstruct them to bear against firm unexcavated or backfill material.

2. Provide firm support by backfilling that portion of the trench for a distance of 2 feet on each side of the thrust block to be reconstructed from the pipe bedding to the pavement subgrade, with either:
a. Sand-cement slurry (94 pounds of cement per cubic yard). b. The native material compacted to a relative compaction of 95%.

3. Then excavate the backfill material for construction of the thrust block.

4. Test compaction of the backfill material before pouring any concrete thrust block.

Use Class 560-C-3250 concrete for reconstruction.

E. Adjacent Parallel Utilities

1. The Contractor's attention is called to utilities throughout the project that are parallel to the proposed utility.

2. The position of these utilities is just outside the new construction. Protect these utilities from any disturbances and repair the lines and associated vaults and appurtenances if they are damaged in any way. All costs incurred for protection of these lines or any costs incurred due to the presence of the lines, whether or not they lie within the new construction, shall be borne in full by the Contractor.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

APPENDIX

THIS PAGE INTENTIONALLY LEFT BLANK

APPENDIX A

CHECKLIST OF LABOR LAW REQUIREMENTS

THIS PAGE INTENTIONALLY LEFT BLANK

CHECKLIST OF LABOR LAW REQUIREMENTS

TO REVIEW AT JOB CONFERENCE MEETINGS

Name (print) Date

Company Project

The Federal and State labor law requirements applicable to the contract are composed of, but not limited to, the following:

1. Payment of Prevailing Wage Rates
The contractor to whom the contract is awarded and its subcontractors hired for the public works project are required to pay not less than the specified general prevailing wage rates to all workers employed in the execution of the contract. The contractor is responsible for ascertaining and complying with all current general prevailing wage rates for crafts and any rate changes that occur during the life of the contract.

Information on all prevailing wage rates and all rate changes are to be posted at the job site for all workers to view.

2. Apprentices
It is the duty of the contractor and subcontractors to employ registered apprentices on the public works project under Labor Code Section 1777.5.

3. Penalties
There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code Sections 1775; 1776; 1777.1; 1777.7 and 1813.

4. Certified Payroll Reports
Under Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records showing the name, address, social security number and work classification of each employee and owner performing work; also the straight time and overtime hours worked each day and each week, the fringe benefits, and, the actual per diem wage paid to each owner, journey person, apprentice worker or other employee hired in connection with the public works project. Employee payroll records shall be certified and shall be made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, or shall be furnished to any employee, or his/her authorized representative on request, pursuant to Labor Code Section 1776. Each contractor and subcontractor shall submit its weekly certified payroll reports to the LCR from the agency no less than weekly or within ten days of request. In the event that there has been no work performed during a given week, the certified payroll report shall be annotated: "No work" for that week. Under Labor Code Section 1776(h) there are penalties required for contractor's/ subcontractor's failure to maintain and submit copies of certified payroll records on request. **For projects bidding after April 1, all contractors will need to upload their certified payroll to the Department of Labor Standards Enforcement website. Effective Jan. 1, 2016, ALL projects will require contractors to upload all certified payroll. This requirement is in addition to the request for payrolls by the City of Redlands;

5. Nondiscrimination in Employment
There exist prohibitions against employment discrimination under Labor Code Sections 1735 and 1777.6, the Government Code, the Public Contracts Code, and Title VII of the Civil Rights Act of 1964.

6. Kickbacks Prohibited
Contractors and subcontractors are prohibited from recapturing wages illegally or extracting "kickbacks" from employee wages under Labor Code Section 1778.

7. Acceptance of Fees Prohibited
There exists a prohibition against contractor/subcontractor acceptance of fees for registering any person for public work under Labor Code Section 1779; or for filling work orders on public works contracts pursuant to Labor Code Section 1780.

8. Listing of Subcontractors
All prime contractors are required to list properly all subcontractors hired to perform work on the public works projects covering more than one-half of one percent, pursuant to Government Code 4100 et seq.

9. Properly Licensed and Registered
Contractors are required to be licensed properly and to require that all subcontractors be properly licensed.

Penalties are required for employing worke
rs while unlicensed under Labor Code Section 1021 and under the California Contractor License Law found at Business and Professions Code Section 7000 et seq.

Contractors and subcontractors are also required to be registered with the Division of Labor Standards Enforcement to work on public works projects in California. Requirements for registration and penalties for not being registered are found in Labor Code 1773.3.

10. Unfair Competition Prohibited
Contractors and subcontractors are prohibited from engaging in unfair competition as specified under Business and Professions Code Sections 17200 to 17208.

11. Workers Compensation Insurance
Labor Code 1861 requires contractors and subcontractors be insured properly for workers compensation.

12. OSHA
Contractors and subcontractors are required to abide by the Occupational, Safety and Health laws and regulations that apply to the particular construction project.

13. Undocumented Workers
Contractors and subcontractors are prohibited by the Federal government against hiring undocumented workers, and must secure proof of eligibility/citizenship from all workers.

14. Itemized Wage Statements
Contractors and subcontractors must provide itemized wage statements to employees per Labor Code 226.

In accordance with Federal and State laws and with t he awarding agency contract documents, t he undersigned prime contractor wishes to assure the City of Redlands that it intends to comply with the above-referenced labor law requirements, fully understanding that failure to comply with the above requirements may subject it to penalties as provided above.

C
ontractor City of Redlands
Name Printed Name Printed
Signature Signature
Title Title
Date Date

IMPORTANT NOTICE
New Requirements for Contractors Working on California
Public Works / Prevailing Wage Projects
S
ignificant changes in prevailing wage law have recently been made that affect all contractors working on Public Works Projects within California. Please note the following important information:

CONTRACTOR REGISTRATION REQUIREMENT
By April 1, 2015, all contractors must be registered with the Division of Labor Standards Enforcement (DLSE) to work on public works projects in California.

WHO must register?
All contractors and subcontractors working on public works projects in California must be registered. This includes prime contractors, subcontractors and sole owner/operators- everyone performing labor on a public works project.

WHEN is registration required?
Contractors must be registered with the DLSE to bid on all public works projects that bid after March 1, 2015.

All contractors working on public works projects must be registered by April 1, 2015. Registration is valid until June 30 of each year and may be renewed annually. Registrations are currently being accepted.

WHERE do I register?
Registration is done online at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm H
OW MUCH is the fee?
Contractor registration fee is currently set at $300 but may increase each year. This fee shall be paid during the initial registration and each annual renewal.

DO I qualify for registration?
Contractors will need to meet minimum qualification standards to be registered. These include:
• Be properly licensed with the Contractors State Lice
nse Board for your trade.
• Provide evidence of workers compensation insurance ( if applicable). • Be in good standing (Have no outstanding liabilities for wages, damages, penalties due to an employee or the State, may not be under State or Federal debarment).

WHAT happens if I don’t register?
Unregistered contractors working on or bidding for public works projects will be subject to an immedia te $2,000 fine and the $300 registration fee to continue working on the project. Unregistered contractors may be removed from the project by the Awarding Agency. Co ntractors found working on public works projects without being registered also risk not being approved for registration by DLSE.

ELECTRONIC CERTIFIED PAYROLL REPORTING REQUIREMENTS

Prevailing wage law has been changed to require con tractors to submit certified payrolls electronically to the DLSE.

WHO is required to submit certified payrolls?
All contractors, subcontractors and sole owner/oper ators will be required to submit certified payrolls electronically to the DLSE.

WHEN do I need to submit certified payrolls electronically? If your project is awarded after April 1, 2015, ele ctronic payroll submission is required immediately.

Otherwise, electronic payroll submission will be required for all projects awarded on or after January 1, 2016.

WHERE do I submit my certified payrolls?
For now, certified payrolls can be submitted by con tractors to the DLSE at:
https://apps.dir.ca.gov/ecpr/DAS/AltLogin This website address will change when the DLSE implements th eir online electronic database system which still has not been developed. Alliant will notify contractors when this system is available.

DO I still need to submit hard copy certified payrolls? The City of Redlands will still require hard copy s ubmission of certified payroll reports per your con tract. The requirement to submit certified payrolls electronic ally to the DLSE does not replace the requirement f or contractors to submit payrolls to the City of Redlands.

Contact the City of Redlands regarding any question s you may have regarding the new requirements for contractor registration or online submission of certified payroll: (909) 798-7698.

PUBLIC WORKS CONTRACT AWARD INFORMATION (DAS-140)
This is not a request for dispatch of apprentices.

Contract award information must be sent to your Apprenticeship Committee if you are approved to train. If you are not approved to train, you must send the information (which may be this form) to ALL applicable Apprenticeship Committees in your craft or trade in the area of the si te of the public work.

Go to: http://www.dir.ca.gov/das/PublicWorksForms.htm for information about programs in your area and trade. The information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcont ract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Do not send this form to the Division of Apprenticeship Standards.

NAME OF YOUR COMPANY CONTRACTORS STATE LICENSE NO.

MAILING ADDRESS-NUMBER & STREET, CITY, ZIP CODE AREA CODE & TELEPHONE NO.

NAME AND ADDRESS OF PUBLIC WORKS PROJECT DATE YOUR CONTRACT WAS EXECUTED

DATE OF EXPECTED/ACTUAL START OF PROJECT

NAME & ADDRESS OF PUBLIC AGENCY AWARDING CONTRACT ESTIMATED NUMBER OF JOURNEYMAN HOURS

OCCUPATION OF APPRENTICE

THIS FORM IS BEING SENT TO: (NAME AND ADDRESS OF APPRENTICESHIP PROGRAM(S) ESTIMATED NUMBER OF APPRENTICE HOURS

APPROXIMATE/ACTUAL DATES TO BE EMPLOYED

This is not a request for dispatch of apprentices.
*Contractors must make a separate request for actual dispatch, in accordance with Section 230.1(a) California Code of Regulations* Check One of the Boxes Below

1. We are already approved to train apprentices by the
Apprenticeship Committee. We will employ and train under their standards. (Enter name of Committee)

2. We will comply with the standards of
Apprenticeship Committee for the duration of this job only. (Enter name of Committee)

3. We will employ and train apprentices in accordance with the California Apprenticeship Council regulations, including § 230.1 (c) which requires that apprentices employed on public projects can only be assigned to perform work of the craft or trade to which the apprentice is registered and that the apprentices must at all times work with or under the direct supervision of journeyman/men.

Signature Date

Typed Name

Title

2J

DAS-140 FORM - PUBLIC WORKS CONTRACT AWARD INFORMATION
(Title 8, California Code of Regulations, Section 230)
(California Labor Code, Section 1777.5 (e))

SUBMIT CONTRACT AWARD INFORMATION

Prior to commencing work on a contract for Public Works every Contractor shall provide contract award information to the apprenticeship committee for each applicable apprenticeable craft or trade in the area of the site of the public works project that has approved the contractor to train apprentices. Contractors who are not already approved to train by an apprenticeship program sponsor shall provide contract award information to all of the applicable apprenticeship committees whose geographic area of operation includes the area of the public works project. This contract award information shall be in writing on a DAS Form 140, Public Works Contract Award Information or a letter which includes the following information:

(1) Contractor's name, address, telephone number and state license number; (2) The full name and address of the public work awarding agency; (3) The exact location of the public work site;
(4) Date of the contract award;
(5) Expected start date of the work;
(6) Estimated journeyman hours;
(7) Occupation of Apprentice;
(8) Approximate number of apprentices to be employed; and (9) Approximate dates apprentices will be employed.

This information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Failure to provide contract award information, which is known by the awarded contractor, shall be deemed to be a continuing violation for the duration of the contract, ending when a Notice of Completion is filed by the Awarding Body, for the purpose of determining the accrual of penalties under Labor Code Section 1777.7.

THE TOP SECTION OF THE FORM COMPLETELY FILLED OUT
will provide the information required
pursuant to California Labor Code Section 1777.5 and California Code of Regulations Section 230.1.

LOWER SECTION OF THE FORM
Check an appropriate box (#1, 2 or 3) for your status.

In addition to the “ORIGINAL(S)” mailed to all applicable Apprenticeship Committees, a copy of this information shall also be submitted to the City of Redlands.

NOTE:

The filing of a DAS 140 is not a request for the dispatch of registered apprentices

CONTRACTOR FRINGE BENEFIT STATEMENT

Project Name: Project Location: Today’s Date:

Contractor / Subcontractor Name: Business Address:

In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourl y rates for fringe benefits, subsistence and/or travel allowance payment made for employees by the employer on the various classes of work are tabulated below. Please Include Apprentice Rates.

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS

Health & Welfare

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Vacation/Holiday

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS

Health & Welfare

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Vacation/Holiday

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:

__________________________________________________

__________________________________________________
Supplemental statements must be submitted during the progress of the work should there be an increase or change in rates. Use additional sheets as necessary. (Attach a copy of your most recent premium transmittal (including copy of check submitted) into each of the above plans/funds/programs or a letter from the above plans/funds/programs reflecting current payment status).

I certify under penalty of perjury that fringe benefits are paid to the approved plans, funds or programs as listed above.

Print Name and Title Signature and Date (Wet Signature Required)

S = STRAIGHT TIME *OTHER –
Any other deductions, contributions and/or payments whether or not included or required by prevailing CERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side ) SDI = STATE DISA BILITY INSURANCE
California
Department of
Industrial Relations
Page ______ of ______

← All documents from this meeting