Cities Index.
Agenda packet

Redlands City Council
July 21, 2026

Document
Agenda packet
Meeting
July 21, 2026
Body
Redlands City Council
Pages
1
Original file
150.8 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

(BY CONTRACTOR) (BY CONTRACTOR)

CITY OF REDLANDS

MUNICIPAL UTILITIES &

ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
For

CALIFORNIA STREET & REDLANDS BOULEVARD

INTERSECTION WIDENING PROJECT
PROJECT NO. 252002
MAY 2026

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
for

CALIFORNIA STREET & REDLANDS BOULEVARD

INTERSECTION WIDENING PROJECT
PROJECT NO. 252002
For use in conjunction with specifications entitled: “Standard Specifications for Public Works Construction (Greenbook)” 2021 Edition; “Standard Plans for Public Works Construction” 2021 Edition; Municipal Utilities and Engineering Department’s Water Systems Standard Specifications and Sanitary Sewer System Standard Specifications, latest editions; and General Permit Conditions and Trench Specifications.

City Council:

Mario Saucedo, Mayor
Marc Shaw, Mayor Pro Tem
Paul T. Barich, Council Member
Eddie Tejeda, Council Member
Denise Davis, Council Member
City Clerk:

Jeanne Donaldson, City Clerk
City Staff:

Charles M. Duggan Jr., City Manager
MAY 2026

THIS PAGE INTENTIONALLY LEFT BLANK
TOC 1

CALIFORNIA STREET & REDLANDS BOULEVARD

INTERSECTION WIDENING PROJECT
PROJECT NO. 252002

TABLE OF CONTENTS
(XX) REFLECTS PAGE IDENTIFICATION FOOTER ABBREVIATION

NOTICE INVITING SEALED PROPOSALS (NIB)

BID DOCUMENTS (BD)
INSTRUCTIONS TO BIDDERS.......................................................................................... 1 PROPOSAL ...................................................................................................................... 10 BID CERTIFICATION........................................................................................................ 16 BID BOND ...................................................................................................................... 17 NON-COLLUSION AFFIDAVIT ...................................................................................... 18 STATEMENT BY BIDDER............................................................................................... 19 OFFICERS OF CORPORATION (Members of Firm)....................................................... 19 SUB-CONTRACTORS LIST............................................................................................. 20 QUALIFICATION AND EXPERIENCE STATEMENT.................................................. 21 GENERAL INFORMATION ............................................................................................. 22

CONTRACT DOCUMENTS (CD)
PUBLIC WORKS CONSTRUCTION CONTRACT........................................................... 2

GENERAL CONDITIONS (GC)
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS...................................................................... 1 SECTION 2 - SCOPE OF THE WORK ............................................................................... 2 SECTION 3 - CONTROL OF THE WORK......................................................................... 3 SECTION 4 - CONTROL OF MATERIALS....................................................................... 7 SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES ...................................... 8 SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK .............................. 30 SECTION 7 - MEASUREMENT AND PAYMENT ......................................................... 32 SECTION 8 - FACILITIES FOR AGENCY PERSONNEL.............................................. 33 SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES CLAIMS ........... 33 SECTION 10 - TRENCHING AND EXCAVATION........................................................ 33 SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF EXISTING UTILITIES................................................................................................... 34 SECTION 200 - ROCK MATERIALS............................................................................... 35 SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS..................... 36 TOC 2
SECTION 203 - BITUMINOUS MATERIALS................................................................. 36 SECTION 206 - MISCELLANEOUS METAL ITEMS..................................................... 37 SECTION 207 – GRAVITY PIPE...................................................................................... 38 SECTION 211 - MATERIAL TESTS ................................................................................ 38 SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 38 SECTION 300 - EARTHWORK ........................................................................................ 39 SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND PLACEMENT OF BASE MATERIALS ............................................................................. 43 SECTION 302 - ROADWAY SURFACING ..................................................................... 48 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION .............................. 58 SECTION 304 - METAL FABRICATION AND CONSTRUCTION .............................. 61 SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 62 SECTION 307 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS………….63

GENERAL REQUIREMENTS
SECTION 01110 COORDINATION OF WORK
SECTION 01112 DESCRIPTION OF WORK
SECTION 01200 MEASUREMENT AND PAYMENT
SECTION 01251 CHANGE ORDER REQUESTS
SECTION 01254 CHANGE ORDERS
SECTION 01298 SCHEDULE OF VALUES
SECTION 01321 CONSTRUCTION SCHEDULE
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY
SECTION 01323 CONSTRUCTION STATUS REPORTS
SECTION 01330 SUBMITTALS
SECTION 01571 STORMWATER POLLUTION PREVENTION PLAN
SECTION 01581 CONSTRUCTION INFORMATION SIGNS
SECTION 01721 MOBILIZATION
SECTION 01722 SURVEYING
SECTION 01732 POTHOLING
SECTION 01740 DEMOBILIZATION

APPENDIX

APPENDIX A CHECKLIST OF LABOR LAW REQUIREMENTS

APPENDIX B CITY OF REDLANDS WORKDAY CONSTRUCTION SCHEDULE

APPENDIX C CITY OF REDLANDS CONTRACTOR SAFETY PROGRAM

APPENDIX D PERMITS
TOC 3

APPENDIX E CITY OF REDLANDS MUED GENERAL PERMIT CONDITIONS

AND TRENCH SPECIFICATIONS

APPENDIX F CULTURAL RESOURCES MANAGEMENT

APPENDIX G EXAMPLE SUBMITTAL FOR EXISTING REINFORCED

CONCRETE BOX CULVERT (FOR REFERENCE ONLY)

THIS PAGE INTENTIONALLY LEFT BLANK

BID DOCUMENTS
(BD)

THIS PAGE INTENTIONALLY LEFT BLANK
BD 1

INSTRUCTIONS TO BIDDERS
For

CALIFORNIA STREET & REDLANDS BOULEVARD INTERSECTION

WIDENING PROJECT
PROJECT NO. 252002
Bids to receive consideration shall be made in accordance with the following instructions:

1. PROPOSALS:
a. Bids shall be made upon the form of proposal furnished by the City. All Bids shall be properly executed with all items filled in; the signatures of all persons signing shall be in longhand. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price shall be considered as representing the Bidder's intention, and the totals may be corrected by the Engineer to conform thereto. If the sum of the individual bid item’s and the total amount named by a Bidder are not in agreement, the sum of the bid item’s shall be considered as representing the Bidder’s intention, and the totals may be corrected by the Engineer to conform thereto. If the total price written in words and the total price written in figures are not in agreement, then the total price written in words will be considered as representing the Bidder’s intention, and the totals will be corrected by the Engineer to conform thereto.
b. Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete Bids, erasures, or irregularities of any kind.

Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.
c. Bids shall be accompanied by a cashier's or a certified check or Bidder's admitted corporate surety bond, in an amount not less than ten percent (10%) of the bid, made payable to the City of Redlands. Said check or bond shall be given as a guarantee that the Bidder will enter into a contract if awarded the work. In the case of refusal or failure to enter into said Contract, within fourteen (14) days after Notice of Award by the City in writing, the security shall be applied by the City to the difference between such bid and next lowest acceptable bid and surplus, if any, shall be returned to Bidder if cash or check is used, or to Surety if bid bond is used.
d. Before submitting a bid, Bidders shall carefully examine the Plans; read the Specifications; read all other Contract documents; shall visit the site of the work; shall fully inform themselves as to all existing conditions and limitations; and include in the bid a sum to cover the cost of all items included in the Contract. No allowance will be made due to lack of examination or knowledge. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered as to character, quality and scope of work to be performed; the quantities of materials to be furnished; and as to the requirements of the Bid Proposal, plans and specifications.

BD 2
e. Pursuant to CA Labor Code Section 1770 et seq., the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available at http://www.dir.ca.gov/OPRL/PWD/. Copies of the prevailing wage determination are also on file at the City of Redlands and shall be made available to any interested party upon request.
f. The bid must be submitted on or before the date and time specified in the Notice Inviting Sealed Proposals (Bids). The bid shall be submitted in a sealed envelope marked in the lower left corner as follows:

BID FOR: CALIFORNIA STREET & REDLANDS

BOULEVARD INTERSECTION

WIDENING PROJECT,
PROJECT NO. 252002
g. Bids will be opened and publicly read aloud at the time set in the Notice Inviting Sealed Proposals (Bids), in the Office of the City Clerk, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.

2. AGREEMENT AND BONDS:

The form of Contract which the successful Bidder, as Contractor, will be required to execute is included in the Contract Documents (CD) of these specifications and should be carefully examined by the Bidder. The Agreement, admitted Corporate Surety Bonds and other documents to be executed by the Contractor shall be executed in original-duplicates stamped according to law, one of which original-duplicates shall be filed with the City Clerk of the City of Redlands. The successful Bidder, simultaneously with the execution of the Agreement, will be required to furnish a faithful performance bond and a labor and material bond, each in an amount equal to one hundred percent (100%) of the Contract price. Said bonds shall provide that if the Contractor or their Subcontractor fails to pay for any materials, provision, provender or other supplies or items used in, upon, for or about the performance of the work contracted to be done, or for any work of labor thereon of any kind, or for amounts due under the Unemployment Insurance Act or Workman's Compensation, with respect to such work or labor, that the surety or sureties will pay for the same. The amount shall not exceed the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. All bonds shall be secured from surety companies satisfactory to the City of Redlands and whose name is on file with the County Clerk of San Bernardino County, as an approved and financially sound surety company authorized to transact business in this state.

3. WITHDRAWAL OF BIDS:
a. Any Bidder may withdraw his Bid, only by written request, at any time prior to the scheduled time for Bid Opening.
b. No Bidder may withdraw his Bid for a period of sixty (60) days after the time of Bid Opening except as allowed by the California Public Contract Code.

BD 3

4. INSURANCE AND HOLD HARMLESS REQUIREMENTS:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract. Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Insurance Requirements as follows:

CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits
and Conduit Construction
(streets)
Grading of Land Street Cleaning
Caisson or Cofferdam Work Hazardous Materials
Contractors Street or Road Construction
Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street
or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting,
Spraying or Removal
BD 4
TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
➢ $5 Million Per Occurrence/ Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
BD 5
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC)
Systems (service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors BD 6
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given. The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.

5. LICENSES AND PERMITS:

No bid will be accepted from a Contractor who is not licensed in accordance with the law under the provisions of Division III, Chapter 9 of the Business and Professions Code of the State of California.

The Contractor shall, at the time of bid opening, possess a valid "Class A" or "Class C-34" Contractor's license, and provide its California State Contractor’s License number to the City.

All subcontractors listed at the time of bid opening shall possess a valid Contractor’s license for the work in which they are specified to complete within the Bid Submittal Package.

BD 7
The Contractor shall, prior to Notice to Proceed, procure all other permits and licenses as stipulated in the GENERAL CONDITIONS.

In addition, no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015 or awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Contractors shall submit proof of registration status with their bid submission to the City of Redlands. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

6. SUBSTITUTION OF SECURITIES:

In accordance with applicable provisions of State law, the Contractor will be permitted to substitute qualified securities in lieu of retention of withheld progress payments by the Owner.

7. SUBCONTRACTORS:

Pursuant to Section 4105 of the California Public Contract Code, the bidder may not circumvent the requirement to list subcontractors by the device of listing one subcontractor, who in turn sublets portions constituting a majority of the work covered by the contract.

A. Pursuant to California Government Code section 4106, subcontractors who will perform work or labor or render services in an amount in excess of one-half of one percent of the Contractor’s total bid shall be set forth in a list of subcontractors within the bid documents. Such list shall be accompanied by an experienced statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual, or entity if requested by City. If City or engineer, after doing an investigation, has reasonable objection to any proposed subcontractor, supplier, individual, or entity, City may, before the notice of award is given, request the apparent successful bidder to submit a substitute, without an increase in the bid.

B. If the apparent successful bidder declines to make any such substitution, City may award the contract to the next lowest bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities declining to make the request and substitutions will not constitute grounds for forfeiture of the bid security of any bidder. Any subcontractor, supplier, individual or entity so listed and against which City makes no written objection prior to the giving of the notice of award will be deemed acceptable by City subject to verification of such assessments after the effective date of the agreement as provided herein.

8. NON DEBARRED CONTRACTORS AND SUBCONTRACTORS
The Contractor and all of its subcontractors shall, at the time of bid opening and for performance of this public works contract, be non-debarred contractors and not be ineligible Contractors pursuant to Public Contract Code section 6109 and Labor Code sections 1777.1 and 1777.7.

BD 8

9. LABOR LAW REQUIREMENTS
Prior to the start of construction, the Contractor and each subcontractor shall submit to the City an executed Checklist of Labor Law Requirements, included within Appendix A, certifying that each Contractor and Subcontractor will comply with the foregoing Labor Law requirements; and fully understands that failure to comply with these requirements will subject it to the penalties cited herein.

By submitting a bid, the prime contractor and subcontractors involved in this project assure that they intend to comply with the labor law requirements noted within Appendix A, fully understanding that failure to comply may subject them to penalties as noted.

10. BID PROTEST PROCEDURES
Any bid protest must be in writing and received by the City Clerk’s Office at 35 Cajon Street, Suite 4, Redlands, CA 92373, before 5:00 p.m. no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:

10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by City, the protesting bidder must submit a nonrefundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section, a “working day” means a day that City is open for normal business, and excludes weekends and holidays as observed by the City.

10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.

10.3 Copy to Protested Bidder. A copy of the protest and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending on the outcome of the protest.

10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk’s Office before 5:00 p.m., within two working days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person representing the protested bidder if different from the protested bidder.

BD 9

10.5 Copy of Protesting Bidder. A copy of the response and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

10.6 Exclusive Remedy. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

10.7 Right to Award. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the Contract notwithstanding any pending or continuing challenge to its determination.

BD 10

PROPOSAL
TO: THE CITY OF REDLANDS, SAN BERNARDINO COUNTY, CALIFORNIA herein called the “City”.

Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract, and complete in a workmanlike manner, all of the work covered by the contract in connection with the City’s Project identified as

CALIFORNIA STREET & REDLANDS BOULEVARD INTERSECTION WIDENING

PROJECT
PROJECT NO. 252002
NOTE: Bidders must bid each item in this schedule. All entries in the entire PROPOSAL must be made clearly and in ink. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.

BID SCHEDULE
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
1 Mobilization (Maximum 5%
of Total Base Bid Price)
LUMP
SUM N/A $______________________
2 Clearing, Grubbing, and
Removals
LUMP
SUM N/A $______________________
3 SWPPP LUMP
SUM N/A $______________________
4 Survey LUMP
SUM N/A $______________________
5 Traffic Control LUMP
SUM N/A $______________________
6 Construction Phasing Plan LUMP
SUM N/A $______________________
7 8” Curb and Gutter (SPPWC
STD 120-2
720 LF $_________/LF $______________________
BD 11
BID SCHEDULE (Continued)
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
8 4” Thick PCC Sidewalk
(SPPWC STD 101-2 and 112-2) 4,260 SF $_________/SF $______________________ 9 6” Curb (City of Loma Linda
Std. R-2.3) 165 LF $_________/LF $______________________ 10 Pedestrian Ramp (Modified
SPPWC Std. 111-5 Case A,
Type 1)
1 EA $_________/EA $______________________
11 Pedestrian Ramp (Detail D on
Street Improvement Plan, Sheet
4)
1 EA $_________/EA $______________________
12 Junction Structure (SPPWC
STD 331-3) 1 EA $_________/EA $______________________
13 AC Pavement 650 TON $________/TON $______________________ 14 Sawcut AC Pavement 1,155 LF $_________/LF $______________________ 15 4’ Wide Curb Inlet Catch Basin
(SPPWC STD 300-3) 1 EA $_________/EA $______________________ 16 6” Thick Commercial Driveway
(SPPWC STD 110-2) 2 EA $_________/EA $______________________ 17 Local Depression (SPPWC
STD 313-3, Case B) 1 EA $_________/EA $______________________ 18 Install 18” RCP Storm Drain 15 LF $_________/LF $______________________ 19 Adjust Electric Vault to Grade 1 EA $_________/EA $______________________ 20 Precast Triple RCB with cutoff
walls 220 LF $_________/LF $______________________
21 Transition Structure (Details on
Sheets 10-13), 1 EA $_________/EA $______________________ 22 Guard Rail (Caltrans STD
A77L1) 50 LF $_________/LF $______________________
23 Traffic Signal Modification LUMP
SUM N/A $______________________
BD 12
BID SCHEDULE (Continued)
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
24 Install 12” white reflective
thermoplastic crosswalk
(Caltrans STD A24E)
70 LF $_________/LF $______________________
25 Install 12” yellow reflective
thermoplastic crosswalk
(Caltrans STD A24E)
240 LF $_________/LF $______________________
26 Install 4” white reflective
thermoplastic edge line
(Caltrans STD A20B Detail
27B)
715 LF $_________/LF $______________________
27 Install Reflective Thermoplastic
Pavement Marking (Caltrans
STD A24A)
7 EA $_________/EA $______________________
28 Install 4” Solid white reflective
thermoplastic line (Caltrans
STD A20B)
270 LF $_________/LF $______________________
29 12”x12”x12” Cut in tee 2 EA $_________/EA $______________________ 30 Install 8” AWWA C-151 DIP
(Class 350) Non-Potable Water
Main and Appurtenances
195 LF $_________/LF $______________________
31 Install 12” AWWA C-151 DIP
(Class 350) Water Main and
Appurtenances
290 LF $_________/LF $______________________
32 12” PVC Sewer Main 45 LF $_________/LF $______________________ 33 Relocate Sewer Manhole 1 EA $_________/EA $______________________ 34 6” P.C.C. Decorative Pavement 1,680 SF $_________/SF $______________________ 35 Grind AC Pavement 5,695 SF $_________/SF $______________________ 36 AC Overlay 5,695 SF $_________/SF $______________________ 37 6’ Chain Link Fence Type CL-6 85 LF $_________/LF $______________________ 38 4” Decomposed Granite 4,290 SF $_________/SF $______________________ BD 13
BID SCHEDULE (Continued)
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
39 Pipe Gate (SBCFCD S.P. 209) 2 EA $_________/EA $______________________ 40 Rail and Wire Revetment with
Anchor 65 LF $_________/LF $______________________
41 4” Thick PCC Apron & Cutoff
Wall 500 SF $_________/SF $______________________
42 Install parapet wall and pipe
support brackets
LUMP
SUM N/A $______________________
43 Unforeseen work not covered
within all other bid items
LUMP
SUM N/A $____500,000____________
44 Demobilization LUMP
SUM N/A $______________________
$______________________
Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ BID SCHEDULE TOTAL PRICE: $_______________________________________________________ BID SCHEDULE TOTAL PRICE WRITTEN IN WORDS: ________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ * Provision is made here for the Bidder to include an addition or deduction in its bid, if it wishes, to reflect any last-minute adjustments in prices. The addition or deduction, if made, will be proportionately applied to the Progress Payments total for the respective item in the Schedule of Prices, the amount being added or deducted for each monthly payment. The unit prices entered in the Schedule of Prices will not be affected.

BD 14
LOW BID DETERMINATION:

The low bid will be determined pursuant to Public Contract Code Section 20103.8 as the lowest bid price on the Bid Schedule Total Price on page BD 13. A responsible bidder who submits the lowest bid as determined by the above method shall be awarded the contract, if it is awarded, by the City Council of the City of Redlands.

BD 15

ADDENDA
Receipt of the following addenda is hereby acknowledged and the same is included in the Bid Price:

Addendum #1___________ Addendum #2___________ Addendum #3____________ (initials) (initials) (initials)
Addendum #4___________ Addendum #5___________ Addendum #6____________ (initials) (initials) (initials)
ATTEST: (if Corporation)
(Corporation Seal)
___________________________________ _____________________________________ Company Name Signature
____________________________________ _____________________________________ Address Name
____________________________________ _____________________________________ City, State, Zip Title
BD 16

BID CERTIFICATION
The undersigned certifies that they are familiar with the various State and local laws affecting labor, length of working days, employer's liabilities, Sunday work, alien labor, domestic materials, Subcontractors, etc.

It is understood and agreed that the work under the contract will be commenced by the undersigned Bidder, if awarded the contract, within ten (10) calendar days from the date in the Notice to Proceed and will be completed by the Contractor in the time set forth in the CONTRACT.

Enclosed find Bidders bond or certified or cashier's check No. _________________ on the __________________________________ Bank, in the amount of ______________________ _______________________ which is not less than ten percent (10%) of the Bid submitted by the undersigned, made payable to the City of Redlands, California and which is given as a guarantee that the Bidder agrees that in case of their default in executing said contract with necessary bonds, the bond or check accompanying this Bid and the money made payable shall become and remain the property of the City of Redlands.

It is understood and agreed that the City of Redlands has the right to waive defects or irregularities and to accept or reject any or all Bids. No Bidder may withdraw their Bid for a period of sixty (60) days after the time of the Bid Opening except as allowed by the California Public Contract Code.

The following information, required by State law under penalty of perjury, is true and correct. Failure to complete this information renders the bid non-responsive, and the bid must be rejected. ____________________________________ _______________________________________ Company Name Signature
____________________________________ _______________________________________ Address Signatory's Title
____________________________________ _______________________________________ City, State, Zip State License Number and Class
____________________________________ _______________________________________ Telephone Number License Expiration Date
Dated this ________________ day of ___________________, 20___.

BD 17

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That ______________________________________________________________ as Principal, and ______________________________________ as Surety, are held and firmly bound unto the City of Redlands, hereinafter called City, in the sum of ______________________________________ dollars, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to said City to perform all work required under the PROJECT NO. 252002.

NOW, THEREFORE, if said Principal is awarded a contract by said City and, within the time and in the manner required under the heading "Instructions to Bidders" bound with said Specifications, enters into a written contract on the form of agreement bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials; then this obligations shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said City and Judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney's fee to be fixed by the court.

SIGNED AND SEALED, this _________ day of _____________________________, 20____. ______________________________(SEAL) _______________________________(SEAL) (Principal) (Surety)
By:_________________________________ By:__________________________________ (Signature) (Signature)
Address:______________________________
_____________________________________
Telephone (___)________________________
(Seal and Notarial Acknowledgment of Surety)
BD 18

STATEMENT BY BIDDER

NON-COLLUSION AFFIDAVIT

STATE OF )
) ss

COUNTY OF )
, being first duly sworn, deposes and says that

he is
(Sole Owner, a Partner, President, Secretary, etc.)
of
(Contractor)
the party making the foregoing bid on PROJECT NO. 252002 that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or of any other Bidder or to fix any overhead, profit, or cost element of the bid price or of that of another bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that the Bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

By: ______________________________ Title: ________________________________ Subscribed and sworn to before me this day of __________________________, 20 .

Signature of Officer Administering Oath
(Notary Public)
BD 19

STATEMENT BY BIDDER
OFFICERS OF CORPORATION (Members of Firm)
The names of all persons interested in the foregoing proposals as principals, are as follows:
(IMPORTANT NOTICE - if Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if a co-partnership, state true name of firm, also names of all individual co-partners composing firm; if Bidder or other interested person is an individual, state first and last names in full). _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ Licensed in accordance with an act providing for the Registration of Contractors, License No. ______________________________________.

Signature of Bidder Dated
NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer(s) authorized to sign contracts on behalf of the corporation; if Bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership, and if the Bidder is an individual, that signature shall be placed above.

BD 20

STATEMENT BY BIDDER

SUB-CONTRACTORS LIST
Bidder supplies the following information for any Subcontractor who will perform work or labor or render services to the prime contractor, etc. to be used on PROJECT NO. 252002, all in accordance with Section 4104 of the California Public Contract Code.

LICENSED SUBCONTRACTOR’S NAME

AND BUSINESS ADDRESS
LICENSE #

SPECIFIC

DESCRIPTION

OF SUBCONTRACT
& BID ITEM #
% OF BID

ITEM TO BE

PERFORMED
BD 21

STATEMENT BY BIDDER

QUALIFICATION AND EXPERIENCE STATEMENT
The following outline is a record of the undersigned Bidder's experience in construction of three (3) projects of a type similar in magnitude and character to that contemplated under PROJECT NO. 252002 within the past two years. Include the location of each project as well as the name, address, and phone number of the owner, and name of individual to contact.

Subcontractors performing in excess of one half of one percent of the prime Contractor’s total bid, or in the construction of streets or highways, one half of one percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater shall provide a similar outline.

Additional pages outlining this portion of the Bid may be attached. Failure to provide this statement may result in rejection of the bid by the City of Redlands.

1. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

2. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

3. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Project Description:

Amount of Contract: Completion Date:

BD 22

STATEMENT BY BIDDER

GENERAL INFORMATION

1. Bidder's Mailing Address

2. Number of years engaged in the contracting business under your present firm or trade name:

3. Have you ever failed to complete any work awarded to you? (Yes or No) . If yes, provide details in the space provided in Item 10.

4. Have you ever defaulted on a contract? (Yes or No) . If yes, provide details in the space provided in Item 10.

5. Have you ever been a party to a lawsuit or gone to arbitration during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

6. Has any Stop Notice been filed against you during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.

7. Has your contractor's license ever been suspended, revoked, or subject to disciplinary action? (Yes or No) . If yes, provide details in the space provided in Item 10.

8. Contracts currently on hand:

Agency Name Amount of Contract Start Date Completion Date

9. Enter the name of person(s) who inspected the site of the proposed work for your firm and the date of said site inspection.

Name: Date:

BD 23

10. In the space provided, the Bidder shall provide details concerning any "Yes" answers provided in this "General Information" section. Details shall include, but not be limited to, the nature of dispute, name of the agency involved and the final outcome. If requested by the City, the Bidder shall supply additional information, sufficiently detailed, to permit evaluation of the Bidder's ability to perform the work.

Question
Number Details

CONTRACT DOCUMENTS
(CD)

THIS PAGE INTENTIONALLY LEFT BLANK

PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this ___ day of ____________, 20__, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and __________________ (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: California Street and Redlands Boulevard Intersection Widening Project, Project No. 252002, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s California Street and Redlands Boulevard Intersection Widening Project, Project No. 252002 (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of ___________________ dollars ($___________) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within one hundred seventy five (175) working day(s) as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each working day as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)
By:____________________________________
Mario Saucedo, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
__________________________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.

WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Municipal Utilities and Engineering Department
California Street and Redlands Blvd. Intersection Widening Project Project No. 252002
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2026.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)

FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and ______________ (hereinafter designated as "Principal") have entered into an agreement dated _____, 2026 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as California Street and Redlands Boulevard Intersection Widening Project, Project No. 252002 and is hereby referred to and made a part hereof; and
Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of ________________________________ dollars ($_______________) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________

LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and ________________ (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated ____________, 2026, and identified as California Street and Redlands Boulevard Intersection Widening Project, Project No. 252002 is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of ______________ dollars ($_____) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________

GENERAL CONDITIONS
(GC)

THIS PAGE INTENTIONALLY LEFT BLANK
GC 1

GENERAL CONDITIONS
The Standard Specifications for Public Works Constructions, 2021 Edition (Greenbook), together with supplements as published by Building News, Inc., are modified herein and comprise the Standard Specifications. For convenience, the section and subsection numbering system used in these modifications correspond to those used in the Greenbook. Unless specifically deleted or modified herein, all requirements of the Greenbook shall prevail.

SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS,

UNITS OF MEASURE, AND SYMBOLS
1-2 TERMS AND DEFINITIONS.

Agency - Amend as follows:
“The legal entity (City) for which the Work is being performed.” Bidder - Amend as follows:
“Any individual, firm, partnership, corporation, or combination thereof, licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, submitting a Bid for the Work, acting directly or through a duly authorized representative.” City. The City of Redlands, San Bernardino County, California, being the legal entity for which the Work is being performed. Also referred to as Agency or Owner.

City Council. The City Council of the City of Redlands, San Bernardino County, California, being the body authorizing entrance into legal agreements and allowing work in public right-ofway or on public property controlled by the City of Redlands. Also referred to as Board.

Engineer - Amend as follows:
“The City Engineer of the Agency, or other person designated by the City Engineer, acting either directly or through authorized agents.”
Fabricated. An item specifically assembled or made out of selected materials to meet individual design requirements.

Guarantee. See Warranty.

Laboratory. The designated laboratory authorized by the City of Redlands to test materials and work involved in the Contract.

Manufactured. A standard mass-produced unit or item meeting design requirements.

Owner. The City of Redlands, San Bernardino County, California.

Pavement. The uppermost layer of material placed on the traveled way or shoulder. Also referred to as surfacing.

GC 2
Rain Day. A scheduled working day when you cannot perform work on the controlling activity for at least 50 percent of the day with at least 50 percent of the normal labor and equipment due to adverse weather-related conditions that cause the Contractor to dismiss the crew.

Street - Delete and replace with the following:
“Any road, highway, parkway, freeway, avenue, street, lane, alley, crossing, intersection, court, place, circle, walk, way, or any public right-of-way within the jurisdiction of the Agency.” Surety - Delete and replace with the following:
“An admitted corporate surety as listed by the United States Department of Treasury and duly licensed to conduct business in the State of California and County of San Bernardino and acceptable to the City of Redlands, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations incurred.”
Warranty. An extended insurance by the Contractor, of any product or item of work installed as a part of this project for replacement and/or repair for the time period specified, including but not limited to, all parts, labor, materials, tools, equipment costs, etc. necessary for the product or item of work to be in proper and acceptable working condition after completion of the project. For the purposes of this Contract, the period of coverage shall begin on the date of the Notice of Completion filed by the Owner.

Working Hours. Unless specified otherwise, working hours shall be from 7:00 AM to 4:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and City Holidays, as shown on the current year Construction Schedule, are excluded unless authorized by the City. 1-7.2 CONTRACT BONDS. - Add the following sentence to paragraph 1:

The warranty provisions set forth in Section 7-18 shall be secured by the Contract Performance Bond required under this section and said Bond shall remain in full force and effect for a period of one year from the date of completion as specified in the Notice of Completion.

SECTION 2 - SCOPE OF THE WORK
2-2 PERMITS. - Amend the following:

Amend the first sentence of paragraph 1 as follows:
“The Contractor will obtain all permits necessary to perform the work in streets, highways, railways or other rights-of-way.”
Add the following sentence between the first and second sentences of paragraph 1:

For all work within Caltrans right-of-way, the Contractor shall obtain their own Caltrans Encroachment Permit and pay all necessary permit and inspection fees as required by Caltrans.

GC 3
Add the following paragraph:

The Contractor shall, prior to the start of work, procure all permits and licenses, including but not limited to, a City Business License for itself, subcontractors, and all parties performing actions associated with this contract within the City of Redlands, City Truck Route Permit, City Street/Lane Closure Permit, City Encroachment Permit, USA Verification Number, DOSH Excavation Permit, other permits required by agencies and/or utilities having jurisdiction on the work, pay all charges and fees required by the City, other agencies and utilities, and give all notices necessary and incidental to the due and lawful prosecution of the work. All City permits associated with this project are no fee to the Contractor.

SECTION 3 - CONTROL OF THE WORK
3-7 CONTRACT DOCUMENTS.
3-7.1 General. – Add the following paragraphs:

Contractor’s working drawings or plans for any structure not included in the plans shall be approved by the Engineer before any work is performed. It is mutually agreed that approval by the Engineer of the Contractor’s working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall be responsible for agreement and conformity of their working plans with the approved plans and specifications.

Finished surfaces in all cases shall conform with the lines, grades, cross sections, and dimensions shown on the approved plans. Deviations from the approved plans will be determined by the Engineer and approved in writing. In the event of a discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct.

Should it appear that the work to be done or any matter thereto is not sufficiently detailed or explained by the plans and specification, the Contractor shall apply to the Engineer for such further explanation as may be necessary and shall conform to such explanation or interpretation as part of the Contract so far as may be consistent with the intent of the original plans and specifications. 3-7.1.1 Preconstruction Meeting. The Contractor to whom the contract is awarded, and all his major subcontractors, shall attend a pre-construction meeting. The time and location of said meeting will be set by the City. Contractor will be given adequate notice of such meeting. It shall be the Contractor's responsibility to notify his subcontractors of the time and location of the meeting. All submittals as required under the General Requirements shall be submitted by the Contractor at the time of the meeting.

The Contractor will be provided with an electronic (.PDF file) of the conformed plans and specifications for their use throughout the project. Contractor is responsible for all costs of reproduction.

Progress meetings will be scheduled by the City. The Contractor will be given at least five working days notice of the time and location of said meetings. The Contractor has the responsibility of notifying his subcontractors, suppliers, and fabricators of the time and location of said meetings.

Meetings will be held either at the job site, at the offices of the City of Redlands, or at any other GC 4
location approved by the City. The Contractor may request, in writing, that a meeting be held.

The City will schedule a meeting at the Contractor’s request not more than five working days after receiving said written notice.
3-7.2 Precedence of Contract Documents. – Replace paragraph 2 with the following:

The precedence shall be (A. being highest, O. being lowest):

A. Permits from other Agencies as may be required by law.

B. Change Orders.

C. Contract.

D. Addenda.

E. Bid Schedule/Proposal.

F. General Requirements.

G. Technical Specifications.

H. Plans.

I. MUED General Permit Conditions and Trench Specifications.

J. City of Redlands Water & Sewer Systems Standard Specifications.

K. General Conditions.

L. City of Redlands Standard Specifications and Detail Drawings for Design and Construction of Public Improvements and all Supplements
M. Standard Specifications for Public Works Construction (SSPWC), 2018 Edition N. Standard Plans for Public Works Construction, 2012 Edition O. Reference Specifications.
3-8.7 Record Drawings. The Contractor shall maintain at the job site, a set of record drawings for the work showing: exact location information of all existing underground utilities encountered, final locations determined in the field, any deviations from the plans and specifications and new work performed within the work area; and all differences between the work as drawn and as installed for all concealed work as well as work added which is not shown on the drawings. Concealed work shall mean all work installed underground or in an area which cannot be readily inspected by use of access panels, inspection plates or other removable features. When vacuum excavation (potholing) services are required, contractor to provide report that identifies depth and alignment of underground utilities.

These record drawings shall be kept current and legible, and shall be available for inspection at all times by the Engineer, Architect and Contractor. All information, changes in the work or work added on these record drawings shall be marked in red. All markings shall use the same legends that are used on the drawings. Indicate locations by exact dimensions and elevations. Give dimensions and elevations from a permanent reference point and prepare all changes to scale.

At the end of construction, the contractor shall prepare one set of marked-up prints of the record drawings indicating any and all revisions and changes to the drawings reflecting As-Built conditions.

The drawings shall also contain a listing of all subcontractors who worked on the construction project.

The As-Built drawings will be submitted to the Municipal Utilities and Engineering Department for review and approval by the City Inspector and Engineer.

The design engineer or City staff shall prepare the final As-Built drawings for record purposes in one of the following two ways: (1) Check out the original drawings from the City and manually revise the GC 5
drawings to reflect the As-Built condition; or (2) Re-plot the original drawings electronically on 4 mil mylars and make revisions electronically to reflect the As-Built conditions. The final As-Built drawings will be reviewed and approved by the City Inspector and Engineer The construction related bonds will not be released by the City until the As-Built drawings are accepted by the Engineer and all City stipulated conditions for the release of the bonds have been satisfied.
3-10 SURVEYING.
3-10.3 Line and Grade. - Add the following sentences to paragraph 1:

All distances and measurements shown are and will be made in a horizontal plane. Construction line and grade staking shall be set at maximum intervals of 25 feet when the grade is 0.50 percent or greater. Construction line and grade staking shall be set at maximum intervals of 12 feet when the grade is less than 0.50 percent.
3-10.4 Permanent Survey Markers.

The Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Profession Code shall be hired as a subcontractor or employed by the Contractor. 3-10.5 Survey Service.

Contractor shall be responsible for: furnishing all surveying and staking, horizontal and vertical, as shown on the plans and in accordance with the specifications; furnishing all staking for sub-grade and base course grades per typical sections; replacing any existing monuments and ties which have been destroyed by construction; identifying, locating and tying out all monuments and ties necessary within the work area; and shall reinstall all disturbed monuments and ties, supplying the Engineer with copies of monument and tie sheets recorded with the County Surveyor in accordance with applicable State law. Monuments shall be approved by the Engineer.

Surveying and staking shall be done by a Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Professions Code.

Unless otherwise specified, stakes will be set and stationed by the Contractor’s surveyor for curbs, headers, sewers, storm drains, structures, rough grade and all other staking necessary for the construction of the work. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet to be supplied to the Engineer. The Contractor shall dig all holes necessary for line and grade stakes.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.2 Acceptance. - Add the following paragraphs:

The Contractor shall submit written assertion that the work has been completed prior to the Engineer making final inspection. The Engineer will have 48 hours to inspect the work. If the Engineer determines that the work is not complete, written notice will be given.

GC 6
Until final acceptance of work by the Engineer, the Contractor shall have charge and care thereof from damage caused by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all injuries or damage to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof.

All work which has been rejected shall be remedied or removed and replaced by the Contractor at their expense with work conforming to the plans and specifications. Any defective material or workmanship which may be discovered before final acceptance or within one year from the date of final acceptance shall be immediately corrected by the Contractor at their expense, notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor’s ultimate responsibility to deliver a complete, operational project that complies in all details with these specifications, at the time of final acceptance.

Any omission or failure on the part of the City to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed as acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The City will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the City is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

Nothing in this section shall be construed to limit the rights of the City to immediately correct conditions which are unsafe or which pose a public health nuisance. Should said corrections later be found to be caused by defective material and/or workmanship, the Contractor and their surety shall reimburse the City for costs reasonably incurred while attending the situation.

In the event it is necessary for the City to file suit to enforce any liability of the Contractor pursuant to this Section, the City shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees including reasonable attorneys’ fees incurred by the City in successfully enforcing the Contractor’s obligation, all to be taxed as costs and included in any judgment rendered.
3-13.3 Warranty. - Amend the following:

Amend the first sentence of the paragraph 3:
“The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence from the date of the final acceptance, except where longer warranty periods are specified.” Add the following paragraphs:

All start-up and testing shall be complete, approved and accepted before final acceptance, substantial completion, or beneficial occupancy.

GC 7
The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the specifications or by law. The remedies provided herein shall not be exclusive and the City shall be entitled to any and all remedies provided by law. 3-14 INSPECTION.

The Contractor shall notify the Engineer at least 24 hours in advance before inspection is required.

Whenever the Contractor varies the period during which work is carried on each day, due notice shall be given to the Engineer so that proper inspection may be provided. Varied working hours may be allowed only upon written authorization from the Engineer.

Work financed in whole or in part with funds from another public entity or performed within the jurisdiction of another public entity shall be subject to inspection at all times by authorized representatives of that entity.

The work shall be ready for inspection, whether by City, other public entities or independent testing laboratories, at the scheduled times arranged by the Contractor. If, in the City’s sole judgment, the work is not ready and the inspection must be rescheduled, the Contractor shall be notified. The Contractor shall reschedule the inspection and provide the proper 24 hour notification for the rescheduled inspection. Any costs incurred by the City for rescheduled inspections shall be reimbursed prior to the release of Bonds.

In order to allow for inspection, the Contractor shall notify the City’s inspector sufficiently in advance of the permanent concealment of any materials or work. The City’s inspector shall make the appropriate notifications to other public entities and independent testing laboratories for inspections.

All inspections required in the specifications for this project shall be coordinated through the City’s inspector.

If any work is concealed or performed without the prior notice specified, the work shall be subject to such tests or exposure as may be necessary to prove to the City, Architect and Engineer, that the materials used and the work performed are in conformity with the drawings and specifications. All labor, tools, materials and equipment necessary for exposing and testing shall be furnished by the Contractor at their expense. The Contractor shall replace at their expense, any materials or work damaged by exposure or testing.

Overtime inspection may be requested by the Contractor. Overtime inspection includes but is not limited to, any hours worked outside of the inspector’s normal working hours including weekends and holidays. Such requests shall be on a case-by-case basis as determined by the Engineer. If the Engineer so determines and approves, overtime inspection shall be paid for by the Contractor at the current City billing rate at the time of request or as billed by other public entities or independent testing laboratories. Any costs incurred by the City for overtime inspection shall be reimbursed prior to the release of Bonds.

SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL. - Delete and replace with the following:

GC 8
Should any work performed or material furnished under the Contract prove defective or not in accordance with the Plans and Specifications and in the opinion of the Engineer such defect is not of sufficient magnitude or importance to make the work dangerous or unusable, or if the removal of such work is impracticable or will create dangerous or undesirable conditions, the Engineer at his discretion shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefore in the payment due the Contractor as may be just and reasonable.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials supplied and equipment installed and incorporated in the work and agrees, upon completion of all work, to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him, to the Owner free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Owner. 4-1.2 Clayton Act. In submitting a bid to the City, if the bid is accepted the Contractor agrees it will assign to the City all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (chapter 2 [commencing with Section 16700] of Part 2 Division 7 of the Business and Professionals Code), arising from purchases of goods, materials, or services by the Bidder for sale to the City pursuant to the bid. Such assignment shall be made and become effective at the time the City tenders final payment to the Bidder.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES
5-1.1 CONTRACTOR’S EQUIPMENT AND FACILITIES.

A noise level limit of 86 dbA at a distance of 15 m (50 feet) shall apply to all construction equipment on or related to the work whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided, except in those cases required for the protection of personnel. 5-1.2 General.

The enclosed toilets required by this section shall be located within an approved yard, if one is acquired by the Contractor. If a yard is not acquired by the Contractor or the project is not within a City owned property, the toilets must be installed on a trailer and removed from the jobsite each day.

At no times shall toilets be stored within the public right of way outside of working hours. 5-3 LABOR. - Amend the following:

GC 9
5-3.1 General. - Add the following paragraphs:

Employment of apprentices are required on projects of $30,000 or more. Provisions in Sections 1777.5 of the California Labor Code fixes responsibility of compliance with that section for all apprenticeable occupations with the Contractor. Section 1777.5 provides that the Contractor and every Subcontractor shall submit contract award information to the applicable joint apprenticeship committee. One apprentice hour for every five journeymen hours worked is the minimum State requirement applicable to each apprenticeable trade. Section 1777.7 of said Labor Code provides that the Contractor shall forfeit as a civil penalty the sum of one hundred dollars ($100.00) for each calendar day of noncompliance with provision of said Section 1777.5.

The Contractor will observe all applicable health and safety requirements, including, but not limited to the California and Federal Occupational Safety and Health Acts. The Contractor shall submit for review by the City a Site Specific Health and Safety Plan prior to the commencement of construction activities. This Plan shall meet or exceed the requirements of 29 CFR 1910.120. 5-3.2 Prevailing Wages. - Add the following paragraphs:

Contractors are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City Council of the City of Redlands, California, by Resolution No. 2326, has ascertained the general prevailing rate of hourly wages and rates for legal holidays and overtime work in the locality where this work is to be performed, for each craft or type of workman or mechanic needed to execute the Contract which will be awarded to the successful Bidder. The Contractor shall comply with Sections 1770 to 1780 inclusive of the Labor Code and Master Labor Agreement of Southern California.

The Contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this Contract in full less legally required deductions and also deductions made pursuant to the regulations prescribed under the so-called “Kick- Back Statute” (48 Sta. 948; U.S.C. 875; 40 U.S.C. 276c).

In accordance with Section 1775 of the California Labor code, Contractor shall forfeit to City, as a penalty, a minimum of $40 for each day, or portion thereof, and a maximum of $200 for each day, or portion thereof, for each worker paid, either by Contractor, or any subcontractor, less than the prevailing rates as determined by the Director of the California Department of Industrial Relations for the work.

Contractor further agrees to fully comply with all applicable provisions of the California Labor Code including but not limited to Sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Failure to abide by prevailing wages and laws by Contractor will be enforced.

The Contractor or subcontractor shall, as a penalty, to the State or political subdivision on whose behalf the contract is made or awarded forfeit twenty-five ($25) dollars for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any calendar day and 40 hours in any calendar work in violation of Labor Code section 1813. 5-3.3 Payroll Records. – Delete and replace with the following:

GC 10
The contractor and subcontractors shall submit electronic certified payroll on a weekly basis to the City of Redlands through LCPtracker. LCPtracker is a web-based labor compliance management system. The Prime Contractor and Subcontractors and lower-tier Subcontractors will receive an email from LCPtracker providing their log-on identification and temporary password. The Contractors will need to follow the instructions in the email to set-up their permanent password and activate their account. Once their account is setup, LCPtracker Inc. provides either computer based or web based training. Training can be accessed via the “Book Now” button located under the “Projects” tab. The prime contractor shall submit their certified payroll, along with any subcontractor who is performing any labor, on a weekly basis. The prime contractor is responsible for all communication with their subcontractors and shall submit their subcontractor’s certified payroll as part of their weekly payroll packet. All labor compliance correspondence and submissions will be made through the LCPtracker software.

All certified payroll shall be submitted no later than 7 days from the close of the pay period. The payroll records shall set out accurately and completely the name, social security number, classification and hourly wage rate of each employee, hours worked by employee during the payroll period and a full weekly wages and the actual weekly wages paid to the employee. Such certified payroll records shall be made available at all time for inspection by the City, the Department of Industrial Relations, the Department of Labor or authorized representatives within ten days of request. The contractor and subcontractor shall preserve weekly payroll records for a period of three (3) years from the date of completion of the Contract. In case on noncompliance with said Section 1776 and after a ten-day period following receipt of written notice, the Contractor shall forfeit to the California Department of Industrial Relations one hundred dollars ($100.00) for each calendar day or portion thereof, for each worker in non-compliance, until compliance is effectuated.

In order to meet labor compliance requirements, all contractors will be required to complete eDocuments which are accessed, submitted and approved through LCPtracker. All eDocuments are required to be signed by an owner/officer or authorized signer. The Prime Contractor and each Subcontractor and every lower-tier Subcontractor and any Vendors subject to this provision shall comply with Title 8, Section 16404 of the California Code of Regulations.

A Fringe Benefit Statement shall be submitted with the first payroll and is required for both the prime contractor and any subcontractors. A new Fringe Benefit Statement will be required when general determinations are issued in February and August. Please refer to the DIR website for additional details. Any weeks where no work was performed must be represented by the submittal of a Statement of Non-Performance covering the 7 day pay period where no hours were worked on the site. Final payroll on the project should state “Final” on the certified payroll, and must be marked as such in the LCPtracker system.

Failure by the Contractor to comply with the aforementioned requirements shall result in withheld progress payments until such time certified payroll documents have been received, reviewed, and accepted by the City. The City reserves the right to seek assistance from the State Department of Industrial Relations in determining the acceptability of certified payroll submittals before release of withheld progress payments. Prior to the release of retention monies, all certified payroll must be submitted on the project and any outstanding issues that may have occurred throughout the project must be resolved.

GC 11
5-4 INSURANCE. - Delete Section 5-4.1, Section 5-4.2 and replace with the following:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract.

Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.

The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Designated Insurance Requirements shown below.

TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits and
Conduit Construction (streets) Grading of Land Street Cleaning Caisson or Cofferdam Work Hazardous Materials Contractors Street or Road Construction Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting, Spraying
or Removal
GC 12
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
➢ $5 Million Per Occurrence/ Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC) Systems
(service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors GC 13
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission ➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees.

To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

GC 14
Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given.

The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.
5-4.3 Worker’s Compensation Insurance. - Delete and replace with the following:

A. Contractor shall have worker’s compensation and employer’s liability insurance in force throughout the duration of the contract in an amount which meets the statutory requirement with an insurance carrier acceptable to the City. The insurance policy shall include a provision prohibiting cancellation of said policy except upon forty-five (45) days prior written notice to City. Certificates of Insurance shall be delivered to the City at the time of the Contractors’ execution of the agreement.

B. Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees. 5-6 PATENT FEES OR ROYALTIES. Delete and replace with the following:

The Contractor shall include in its Bid the patent fees or royalties on any patented article or process which may be furnished or used in the Work. The Contractor shall indemnify and hold the City GC 15
harmless from any legal action that may be brought for infringement of patents. The Contractor’s attention is directed to “Notice of Patents, Data, and Copyright Regulations” of the Federal Labor Standards.

The Contractor shall bear all costs arising from the use of patented goods and/or processes used on and/or incorporated into the Work. When use of these goods and/or processes is judged to be an infringement and the use is banned, the Contractor, at its own expense, shall, with concurrence of the Engineer, do one of the following:

A. Secure for the City the right to continue using goods and/or processes by suspension of the injunction or by procuring a license(s);
B. Replace said goods and/or processes with non-infringing goods and/or processes; C. Modify said goods and/or processes so that they become non-infringing; or D. Remove said goods and/or processes and refund the sum paid therefore without prejudice to any other rights of the City.

The preceding shall not apply to any goods manufactured to the detailed design of the City contained in the Contract Documents.
5-7 SAFETY.
5-7.1 Work Site Safety.
5-7.1.1 General. - Amend the following:

Add the following sentences to paragraph 1:

Should watering be the sole method utilized for roadway dust abatement purposes, the maximum time interval that shall elapse between applications thereof shall be no greater than 3 hours during normal working day, supplemented by an additional application thereof immediately prior to the conclusion of the workday and at such other times as may be required, including evenings, weekends and holidays as required by the Engineer. Should the Contractor be unable to furnish dust abatement as specified, the City may perform or cause to be performed the necessary service, the expense of which will be deducted from the payment due the Contractor.

Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during cleanup and dust control operations. Refer to Section 7-8.6.

Compliance with this section is of extreme importance to the City and its citizens. The City may fine the Contractor $1,000 per incident if there are issues with dust, mud, unused equipment or materials and rubbish within the construction area that result in citizen complaints. A 24 hour notice shall be issued to the Contractor and failure to correct the problems will result in the fine being levied. This fine will be in addition to those fines potentially charged for NPDES violations.

GC 16
5-8 AIR POLLUTION CONTROL.

Dust control shall be performed in accordance with Subsection 7-8 of the Standard Specifications, South Coast Air Quality Management District (SCAQMD) Rule 403, the general Provisions and the following Provision.

Dust resulting from the Contractor’s performance of the work, either inside or outside, the right-ofway shall be controlled by the Contractor. Dust control includes the action necessary to prevent, reduce or control dust within the work area as required to complete the work. The Contractor shall carry out proper and efficient measures to prevent his operations from producing dust in amounts damaging to property or causing a nuisance, or harm to persons living nearby or occupying buildings in the vicinity of the work. The Contractor shall control dust 24 hours a day, seven days a week. The methods to be used for controlling dust in the construction area and along haul roads shall be approved by the Engineer prior to starting any work. The Rule 403 Implementation Handbook published by the SCAQMD, contains a detailed listing of reasonably available dust control measures.

Dust control ordered by the Engineer to be applied on Saturdays, Sundays or holidays will be included in the Contract price for dust control and no additional compensation will be allowed therefore.

The full compensation for all direct and indirect costs incurred for work performed or materials used to control dust resulting from the Contractor’s performance of the work and caused by public traffic, either inside or outside the right-of-way shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefore. 5-9 STORAGE OF EQUIPMENT AND MATERIALS.

The Contractor shall be required to provide and maintain as necessary, any additional property required for storage of equipment, materials, etc., to perform work on this project. Should the additional property be located within the city limits of the City of Redlands, the Contractor shall obtain written approval from the City of Redlands Development Services Department and comply with all conditions set therein prior to use. When private property is used for a yard area, the Contractor shall also secure written authorization from the private property owner and supply a copy of such to the City before any monthly progress payment is submitted. Contractor to propose designated areas of the project site, upon approval by the Engineer, suitable for material delivery, storage, and waste collection.

The Contractor shall ensure the construction yard adheres to all local, State and Federal regulations, ordinances, codes and maintained in a neat and orderly manner throughout the duration of the project.

The contractor shall include the construction yard in the Erosion Control Plan or SWPPP and shall be inspected and approved prior to use of the yard. If at any time during the project the location of the construction yard changes from the approved site, the City shall be notified prior to relocation for inspection and approval. Should the Contractor fail to comply with these conditions, the Engineer may suspend the work per SSPWC section 6-3 until the condition is corrected.

GC 17
At the end of the project or as required, the Contractor shall: clean up and remove all trash and debris, including all organic trash and debris; clean up and remove all hazardous and biochemical wastes from the property to the satisfaction of the agency (City, County, State, or Federal) charged with overseeing these items; and provide to the City a written release from the private property owner that they are satisfied with all clean up and removal work.
5-9.1 Storage in Public Streets.

Construction materials and equipment shall not be stored within public streets or right of way without prior approval from the City. In order to seek approval, Contractor shall submit a location map with all equipment or materials identified including size, duration and any BMP’s installed and provide at least 7 days for review by the City.
5-10 WATER POLLUTION CONTROL.

The Contractor shall follow the City's guidelines for Storm Water Pollution Prevention in providing storm water pollution control at the project site, including the implementation of approved Erosion/Sediment Control Plans during construction as well as the implementation of approved Water Quality Management Plans.

Construction activities disturbing 1 acre or more of land shall comply with the State Water Resources Control Board’s NPDES General Construction Storm Water Permit. A copy of the Notice of Intent (NOI) to include the Waste Discharge Identification (WDID) number shall be submitted as part of the Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review. Call (909) 782- 4130 for NOI/WDID information.

All projects requiring grading shall submit to the City for review and approval an Erosion/Sediment Control Plan and a Grading Plan. Permit(s) will not be issued until plans are approved and may be revoked if work required in these specifications are not complied with.

Construction sites shall be maintained by implementation of BMPs in such manner that pollutants are not discharged from the site to the maximum extent practicable. A few references available to help with selection and implementation of applicable BMPs are:

1. California Storm Water Best Management Practice Handbook, American Public Works Association, March 1993;

2. The Construction Site Best Management Practices Manual, November 2000;

3. Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual, November 2000;

4. California Regional Water Quality Control Board’s San Francisco Bay Region, Guidelines for Construction Projects; and

5. California Regional Water Quality Control Board’s San Francisco Bay Region, Erosion and Sediment Control Field Manual, July 1999.

All discharges into the storm drain system are prohibited except for potable water, properly treated discharge, and those discharges specifically approved by the Engineer. The following are some of the prohibited discharges:

GC 18

1. Discharges that could have an impact on human health or the environment, cause or threaten to cause pollution, contamination, or nuisance;

2. Discharges that exceed any applicable water quality standard contained in a statewide Water Quality Control Plan or local Basin Plan; and

3. Discharges containing hazardous substances equal to or in excess of a reportable quantity listed in Federal regulations 40 CFR, Parts 117 and 302.

Materials that can cause or contribute to pollution or a violation of any applicable water quality standard include, but are not limited to: sediments; solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides or herbicides and wood preservatives or solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants or hydraulic, radiator and battery fluids; fertilizers; vehicle and equipment wash water or concrete wash water; concrete, detergent or floatable wastes; wastes from any engine and equipment steam cleaning or chemical degreasing; and chlorinated potable water line flushings.

Unless exempted or authorized by an NPDES permit, all non-storm water discharges require prior approval by the Engineer or the State Water Resources Control Board with Engineer approval.

During construction, temporary storage of such materials as identified above, must occur in a designated area physically separated from potential storm water runoff, with ultimate disposal in accordance with local, state and federal requirements.

De-watering of contaminated groundwater or discharging contaminated soils via surface erosion is prohibited.

Unless indicated otherwise by the Engineer, all projects, regardless of size, shall submit for review and approval, a Water Quality Management Plan (WQMP). The WQMP shall consist of post construction BMPs which shall remain in effect throughout the life of the facility. Refer to WQMP guidelines.
5-11 TEMPORARY LIGHTS, POWER AND WATER.

Any water drawn from a City fire hydrant shall be via a City owned water meter. Said meter may be obtained from the Municipal Utilities & Engineering Department. Contractor is responsible for payment of a $1200 deposit fee. Said meter shall be returned in a condition like received, less normal wear and tear. All meters are loaned subject to the conditions of the Fire Hydrant Construction Meter Water Service Application. Contractor must provide proposed location of meter and notify Customer Service at (909) 798-7516 each time the meter is relocated during construction. Water reasonably used in connection with the construction contract will be provided at no cost to the Contractor. Water use determined to be wasteful or unreasonable will be charged for at the prevailing rate. 5-12 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.

GC 19
The Contractor shall relocate, re-establish, repair or replace all existing improvements within the work limits or right-of-way which are not designated for removal (e.g., sprinkler systems, curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations.

Relocations, re-establishments, repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing or reestablishing existing improvements shall be included in the Bid.

The Contractor shall be responsible for the maintenance of the streets and roadways to be used by public and local traffic through and adjacent to the construction zone, from the date of "Notice to Proceed" until the date of acceptance of the completed construction improvements.

Street maintenance shall include filling of potholes, grading of subgrade and base, replacing signs, installing interim pavement striping and markers on the project streets and other side streets within the construction zone. Street maintenance shall also include sweeping and washing of streets, adjacent and connected to the construction zone on a weekly, or more frequent schedule, to prevent the accumulation of dust, dirt, gravel or other deleterious materials, all as necessary to maintain the construction roadways and adjacent streets in a safe, clean and drivable condition for use by public and local traffic.

Upon request from the City for information pertaining to a claim against the contractor, contractor shall provide a written/email response, including all requested information, within 14 calendar days of City’s request. If a response with all requested information is not provided to the City within 14 calendar days, a penalty of $500 per calendar day will be assessed to the Contractor by the City. 5-13 PUBLIC CONVENIENCE AND SAFETY.
5-13.1 General.

The Contractor may be allowed to close the roadway, or a portion thereof, to traffic during normal work hours upon approval from the Engineer. During any closure, the Contractor shall allow access for residents, schools, trash service trucks, churches and businesses within the affected portion of roadway, except as required for construction for a reasonable period of time. The Contractor shall notify residents as noted within Section 5-18.

The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the Work Area Traffic Control Handbook (WATCH) prepared by the Southern California Chapter of the American Public Works Association. During adverse weather or unusual traffic or working conditions additional devices shall be placed as directed by the engineer.

All traffic signs and devices shall conform to the current State of California, Department of Transportation (CALTRANS), "Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways", unless otherwise approved by the Engineer.

GC 20
Fences, barriers, lights and signs shall be furnished, erected and maintained as necessary to give an adequate warning to the public at all times that the work is under construction and of dangerous conditions to be encountered as a result thereof, and warning and directional signs shall also be erected and maintained as may be required by the City. Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the following provisions:

1. For placing of barricades - $15.00 per barricade for each day or part thereof.

For flashers - $15.00 per flasher for each day or part thereof.

For traffic cones - $7.50 per cone for each day or part thereof.

2. In the event that the services of the Owner are required outside the normal working hours and/or days or items not noted above are furnished by the City, all costs incurred by the City shall be the responsibility of the Contractor.

The Contractor shall relocate, preserve and maintain the visibility of all signs within the project limits which affect the flow of traffic, as directed by the engineer. Any signs that are missing or found damaged shall be replaced immediately by the Contractor at his expense.

The Contractor shall provide and maintain Class II barricades along excavation edges parallel to the flow of traffic at a spacing of twenty-five feet (25'). Class II barricades mounted with flashers shall be installed around work areas in parkways. Class II barricades shall have alternating black and reflectorized white (or yellow) stripes at an angle of 45 degrees. The stripe with shall be four to six inches.

During paving operations barricades may be supplemented with minimum size eighteen-inch (18") high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty-five feet (25"). At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot (5') intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a "Road Closed" sign shall be provided. "No Left Turn" sign shall be provided wherever required by the Engineer.

Clearances from traffic lanes shall be 5 feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator or other vertical obstruction.

A 4 foot wide pedestrian walkway shall be maintained in the parkway area on each side of all streets, unless otherwise authorized by the Engineer. The minimum clearance from: the edge of pedestrian walkways to any traffic lane shall be 5 feet; the edge of pedestrian walkways to any work zone shall be 3 feet; and the surface of pedestrian walkways to any overhead obstruction shall be 7 feet.

GC 21
The Contractor shall, at the end of each work day, have backfilled, compacted and placed a temporary drivable roadway surface on all work areas within traveled roadways prior to leaving the job site. Failure to comply to the satisfaction of the Engineer shall result in immediate correction by City forces, and all costs shall be borne by the Contractor.

Traffic control devices shall be marked with the Contractor’s name as appropriate. At no time shall any traffic control devices marked with companies or agencies other than the Contractor or subcontractors, be utilized within the work area.

All said traffic controls and safety devices shall be maintained in clean condition, with any and all graffiti removed by the end of workday on which the graffiti was first reported to the Contractor.

If the traffic control devices are deemed unacceptable by the Engineer due to being damaged, dirty, or marked incorrectly, the Contractor shall replace the traffic control devices immediately. Should the Contractor fail to furnish traffic control devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the provisions above.
5-13.1.1 Vehicular Access.

At such times as driveways are inaccessible due to the Contractor's work they shall be blocked by two (2) Class II barricades or one (1) Class II barricades and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a delineator at each side. 5-13.1.2 Signage. The Contractor shall furnish, erect and maintain all construction traffic signage as required and specified.

All construction traffic signage shall be in place prior to commencing any work, placed as needed during construction, moved as necessary and removed only upon completion of all work.

All construction traffic signage and controls shall comply with the State of California Manual of Traffic Controls, Warning Signs, Lights and Devices for use in Performance of Work Upon Highways. All construction traffic signage used in the performance of the work shall be a minimum of the encapsulated lens (high intensity) type. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices, telescoping flag trees, flags, signs, markers, portable barriers, flashing arrow signs, changeable message signs, markings and flagging equipment shall be provided and maintained in like new condition.

When a Traffic Signal is constructed as a part of the project, the Contractor shall place and maintain for one calendar month, a message board for each approach leg to a new traffic signal. The message board shall read “CAUTION - NEW TRAFFIC SIGNAL”. The one month period shall begin from the day of activation. This requirement may be lessened or waived, on a case-by-case basis, by the Engineer.

The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, including holidays, all said GC 22
devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of notice to proceed to the completion and acceptance of the work. Any corrective work required to be performed by City forces shall be charged to the Contractor and paid in full before release of any bonds on the project.

All traffic cones shall be no less than 28 inches in height, except that shorter cones, 12 inches minimum height, may be permitted during striping maintenance operations where the only function of the cone is to separate traffic from the wet paint. All barricades used to delineate traffic at night or placed in or adjacent to the traveled roadway at night, shall be equipped with flashing warning lights.

Channelizers shall be required when lane restrictions, detours or other work conditions need to be maintained for periods longer than normal work hours. Channelizers shall be surface-mounted type and shall be furnished, placed and maintained at the locations shown on the plans or as approved by the Engineer and shall conform to these specifications. Channelizers shall be, at the Contractor’s option, one of the following types, or approved equal: (1) Safe-Hit SH236SMA; (2) Repo “The Replaceable Post”; or (3) Carsonite, “Super Duck” SDF-436.SDF-436. 5-13.2 Traffic Control Plan
The Contractor shall provide a Traffic Control Plan to the agency for approval prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days.

The Contractor shall be required to maintain one lane in each direction when working on the roadway.

Access to schools, businesses, etc. shall be maintained as necessary for their operations. If closures are authorized by the Engineer, all detour signage shall be installed prior to closure of specified portion of roadway(s), and shall be maintained during closure.

The Contractor shall make provision to allow pedestrians full access across work areas at existing crosswalks, while working within those areas.

Traffic controls, including but not limited to vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access, detours, and street closures shall be in accordance with Subsection 7-1, of the current edition of the "Standard Specifications for Public Works Construction," including all its subsequent amendments, and the current edition of the "Work Area Traffic Control Handbook." Traffic control and the Traffic Control Plan shall conform to the following:
a. All major streets shall remain open to through-traffic at all times, residential street will be closed to traffic only as long as it takes for material application and drying time.
b. The Traffic Control Plan shall indicate the traffic control requirements for the different types of work to be performed. The Contractor shall be GC 23
responsible for the preparation of Plans as necessary for specific items of work. These Plans shall be approved by the City's Engineer. c. All traffic controls and safety devices, equipment and materials, including but not limited to cones, delineators, flashing warning lights, barricades, high level warning devices (flag trees), flags, signs, markers, portable barriers, flashing arrow signs, markings, and flagging equipment shall be provided and maintained in "like new" condition.
d. The Contractor shall furnish and properly install, construct, erect, use, and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include area affecting or affected by the work, from the start of work to the completion of the work.

In the event the slurry and cape seal ravels, a "loose gravel" (C6) sign shall be placed to adequately warn the public.
e. High-level warning devices (flag trees) are required at all times for any work being performed within the roadway unless otherwise specifically authorized by the City's Engineer.
f. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than twenty-eight inches (28") in height, except that shorter cones, twelve inches (12") high or higher, may be used during striping maintenance operations where the only function of the cones is to protect the wet paint from the traffic.
g. Type III barricades, no less than six feet (6') in length and equipped with two (2) Type "N" markers each and two (2) flashing warning lights each, shall be used to close streets, except as otherwise specifically authorized in advance by the City's Engineer for minor maintenance work of no more than one (1) working days duration on weekdays, or on holidays only, and between 8:00 a.m. and 3:30 p.m. only. Said barricades shall be placed across the full roadway at each point of closure with the distance between barricades or between barricades and curbs, not exceeding three feet (3'), except that one (1) eleven-foot (11')-wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street's center, facing the inbound vehicular traffic, shall also be equipped with one (1) Type C2 "Road Closed" sign each or one (1) Type C3A "Road Closed to Thru Traffic" sign each.

GC 24
h. Except for residential streets, as otherwise directed and/or authorized by the City's Engineer, two-way vehicular traffic shall be maintained at all times within two (2) eleven foot (11')-wide lanes on streets, having an effective roadway width of forty-four feet (44') or more with restricted parking, and other streets of lesser widths may be reduced to one (1) twelve-foot (12') wide lane with work activity being limited to one side at a time, and with one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers.

No reduction of the traveled way width shall be permitted on any City street before 8:00 a.m. nor after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless prior authorization to do so is granted by the City's Engineer.

Arrow boards shall be required for all lane closures on major streets. i. Properly trained and experienced flaggers shall be provided to traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at such other times as is necessary to safely pass the traffic through or around the work area, and when so directed by the City's Engineer.
j. Vehicular access to occupied residential property may be restricted on weekdays other than holidays between the hours of 8:00 a.m. to 3:30 p.m. while essential work activity is taking place, with specific prior written approval from the City's Engineer, providing the Contractor gives the owner and/or resident at least forty-eight (48)-hour advance written and oral notice. See Part 2, "Notification of Residents," herein.

Convenient and safe pedestrian access to occupied residential property shall be maintained at all times. Access to mailboxes must be maintained at all time, such that the postal delivery service is not interrupted.

Access to vacant and unused property may be restricted at the Engineer's discretion. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the City's Engineer.
k. Any traffic control and safety devices and equipment being used which becomes damaged, destroyed, faded, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired refurbished and/or replaced, and any traffic control and safety devices and equipment being used which are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.

GC 25
l. An unobstructed view of all signs and warning devices including but not limited to stop signs, stop ahead signs, street names signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers, and devices from the view of vehicular and/or pedestrian traffic to which it applies.
m. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.
n. Stockpiling and/or storage of materials on any public right-of-way or parking areas will not be allowed without specific permission of the Engineer. Materials spilled along or on said right-of-way or parking areas shall be removed completely and promptly. All stockpile and/or storage areas shall be kept in a safe, neat, clean, and orderly fashion, and shall be restored to equal or better than original condition upon completion of the work.
o. Where vehicular access to abutting property must be restricted, the work shall be so selected, arranged, and scheduled that the person(s) requiring access to said abutting property and/or residents along said streets affected will be able to park within a reasonable distance of not more than five hundred feet (500') from their homes and/or destination. Residents must be supplied written notice of such restrictions a minimum of 48 hours in advance.
p. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, "NO PARKING" signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street except as otherwise authorized or directed by the City's Engineer. q. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to hereinabove, the City reserves the right to correct and/or mitigate any situation, which in the sole opinion of the City's Engineer constitutes a serious deficiency and/or serious case of noncompliance, by any means at its disposal at the Contractor's and/or permittee's expense, and will deduct the cost therefore from the Contractor's progress and/or final payment. Such corrective action taken by the City shall not reduce or abrogate the Contractor's legal obligations and liability for proper traffic control and safety measures, and shall not serve to transfer GC 26
said obligations and liabilities from the Contractor to the City or the City's agents.
r. Violations of any of the above Provisions and/or Provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the City's Engineer, shall at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor and/or permittee, or liability to the City, all as prescribed by Contractual obligation or State law, whichever is applicable.

Full compensation for furnishing all labor, materials, tools, equipment, flaggers, lights, channelizers (surface mounted), temporary striping, barricades, portable flashing lights, flashing arrow signs, traffic control and detour plan, and incidentals required to comply with the provisions specified and referred to herein above, to provide all required traffic and pedestrian control for the duration of this contract, all as shown and as specified, shall be paid as specified in Section 01200 of the General Requirements and no other compensation shall be made therefore.

5-13.3 Edison Energized Conductors. The Contractor hereby promises and agrees that in the performance of the Work, he will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to Edison's secondary, primary and transmission facilities. The term "qualified person" is defined as follows:
"Qualified Person". A person by reason of experience or instruction is familiar with the operation to be performed and hazards involved.

Contractor further promises and agrees that the provisions of this paragraph shall be and are binding upon any Subcontractor or Subcontractors that may be retained by it, and that the Contractor shall take such steps as are necessary to insure compliance by said Subcontractor or Subcontractors with the requirements of this paragraph.
5-14 CONTRACTOR’S RESPONSIBILITY FOR DAMAGE.
5-14.1 Responsibility for Damage. The Contractor agrees to and does hereby indemnify, defend and hold harmless the City, its elected officials and the Consultant and their officers, agents and employees from every claim or demand made, and every liability, loss, damage, or expense of any nature whatsoever, including attorney's fees and costs, which may be incurred by reason of:
(a) Liability for damages for (1) death or bodily injury to persons, (2) injury to loss or theft of property, (3) any other loss, damage or expense arising under either (1) or (2) above, sustained by the Contractor or any person, firm or corporation employed by the contractor upon or in connection with the work called for in this agreement, except for the liability resulting from the sole negligence or willful misconduct of the City, its elected officials and their officers, employees and agents who are directly employed by the City and the Consultant; and GC 27
(b) any injury to or death of persons or damage to property caused by any fault, neglect, default or omission of the Contractor, or any person, firm or corporation employed by the Contractor, either directly or by independent contract, including all damages due to loss or theft, sustained by any person, firm or corporation, including the City, arising out of, or in any way connected with the work covered by this agreement, whether said injury or damage occurs either on or off City property, provided that any of the foregoing (1) is attributable to personal injury, bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself), including the loss of use resulting there from, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, any supplier, anyone directly or indirectly employed by any of them or anyone for whose act or omissions any of them may be liable, regardless of whether or not caused in part by any act or omission (active, passive, or comparative negligence included, excepting the active negligence of the District) of a party indemnified hereunder.
(c) The Contractor, at its own expense, cost, and risk shall defend any and all actions, suits or other proceedings that may be brought or instituted against the City, its elected officials, officers, agents and employees and the Consultant, against any such claim, demand or liability, and shall pay or satisfy any judgment that may be rendered against the City, its elected officials, officers, agents or employees, in any such action, suit or other proceedings as a result thereof.
5-15 NO PERSONAL LIABILITY. Neither the City Council, the Engineer, the Consultant, nor any other officer or authorized assistant or agent shall be personally responsible for any liability arising under the contract.
5-16 CONTRACTOR'S RESPONSIBILITY FOR WORK. Except as provided above, until the formal acceptance of the Work by the City, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the Work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof, except such injuries or damages occasioned by act of the federal government or the public enemy.

The City of Redlands shall not be held responsible for the care or protection of any material or parts of the work prior to final acceptance, except as expressly provided in these specifications.

The City shall not be responsible for security of the Contractors equipment or materials at the site.

The City will not be responsible for theft or damage to any property or materials of the Contractor.

Security for Contractor’s property shall be the responsibility of the Contractor. 5-17 WARRANTY OF WORK. The Contractor shall guarantee the Work against defective materials or workmanship for a period of (1) year from the date of completion date specified in the Notice of Completion, except where longer warranty periods are specifically stated. As specified in Section 2-4 in the GENERAL CONDITIONS, the Performance Bond shall remain in full force and effect during the warranty period.

GC 28
All work which has been rejected, shall be remedied, or removed and replaced, by the Contractor at his own expense, with work conforming to the Plans and Specifications. Any defective material or workmanship which may be discovered before final acceptance or within (1) one year from the completion date specified in the Notice of Completion shall be corrected immediately by the Contractor at his own expense notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor's ultimate responsibility to deliver at the time of final acceptance a complete project that complies in all details with these Contract Documents. All items shall be ready to operate.

Any omission or failure on the part of the Owner to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed an acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.

The Owner will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the Owner is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.

During the (1) one year warranty period, should the Contractor fail to remedy defective material and/or workmanship, or to make replacements within five (5) days after written notice by the Owner, it is agreed that the Owner may make such repairs and replacement and the actual cost of the required labor and materials shall be chargeable to and payable by the Contractor or his Surety.

Nothing in this section shall be construed to limit the rights of the Owner to immediately correct conditions which may be unsafe or which may pose a public health nuisance. Should said conditions later be found to be caused by defective material and/or workmanship, the Contractor and his Surety shall reimburse the Owner for costs reasonably incurred while attending the situation.

In the event it is necessary for the Owner to file suit to enforce any liability of the Contractor pursuant to this sections WARRANTY OF WORK, the Owner shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees, including reasonable attorneys' fees, incurred by the Owner in successfully enforcing the Contractor's obligations, all to be taxed as costs and included in any judgment rendered.

The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the Contract Document or by law. The remedies provided herein shall not be exclusive and the Owner shall be entitled to any and all remedies provided by law. 5-18 NOTIFICATION OF RESIDENTS/BUSINESSES. The Contractor shall notify all residents, firms, institutions, agencies, and utility companies which may be affected by the work.

Notification shall be by hand delivery of an approved notice within the project limits approved by the City. The notification process shall consist of two notifications, one prior to the start of construction for all properties within the project area and a second notification at least seven days in advance of any activity which may impact each specific property. In the event of any work within the downtown GC 29
area, the distribution of the second notification shall be at least fourteen days in advance of any activity. Activities impacting said properties and, therefore, requiring the above said notices include the following: the work itself; closure or partial closure of the street; and disallowance of street parking and disallowance of vehicular ingress to or egress from the property.

Said firms, institutions, agencies, and utility companies which must be notified of proposed work shall include, but are not limited to the following: public schools, private schools, day care centers, postal service, hospitals, governmental services, police department, fire department, ambulance services, Omnitrans, solid waste collection, and City street sweeping.

The proposed notice shall be submitted to the Engineer at least seven calendar days prior to the date of distribution for review and approval. The submittal shall also include a map identifying the limits of the work and proposed limits of distribution. The printed notices shall contain a general description of the work to be done, the name of the street with limits, the day and date of the work and the name and telephone number of the Contractor. The notice shall also include a statement that there will be no disruption of trash collection schedules and that trash should be set out by 6:00 a.m. on the scheduled day of pickup. If on-street parking will be affected the notice shall include a statement that no on-street parking will be allowed between the hours of 7:00 a.m. and 5:00 p.m. on the day of work, and a statement that it will be necessary to tow away parked vehicles at the owner's expense per California Vehicle Code CVC 22651L and CVC 22654D.

The Contractor will provide City with the dates and addresses of when project notifications are delivered to affected properties. City will verify the notification process is completed in compliance with the requirements of the specifications. Work will commence when City approves Contractor’s compliance with the requirements set forth in the specifications.

If on-street parking is affected, the Contractor shall also post pre-approved "NO PARKING-TOW WAY" signs on 1 x 2 wood stakes or barricades at one hundred foot (100’) maximum spacing along the affected areas of the street, 48 hours prior to the start of the work. The "NO PARKING-TOW AWAY" signs shall contain the day, date, and hours that parking will be prohibited on that particular street and a statement that parked vehicles will be towed away at owner's expense per California Vehicle Code CVC 22651L and CVC 22654D. The Contractor shall maintain said signs throughout the day of work, and shall start the removal of said signs by 4:00 p.m. and complete the removal by 6:00 p.m. on said day of work or as otherwise directed by the Engineer.

The Contractor shall document the day, date, and time the signs are installed because the no parking restriction cannot be enforced until the signs have been in place 24 hours. Posting of signs on trees, utility poles, light standards and other existing parkway improvement is strictly forbidden.

In the event of street resurfacing operations, the notices to residents shall contain a statement that the street to be resurfaced will be closed to vehicular traffic, and the suggestion that if they require the use of their vehicles on the day of the resurfacing work, they should consider parking their vehicle on a nearby street which is not scheduled for a resurfacing application.

In the event scheduled work is delayed, theContractor shall immediately remove all "NO PARKING" signs. The contractor must notify all previously notified, in person and with printed notices, that the GC 30
work will be rescheduled and that they will be re-notified 48 hours in advance. The Contractor shall have an adequate supply of approved notifications for distribution to residents.

Full compensation for conforming to these requirementsshall be considered as included in the various Contract items of work involved, and no additional compensation will be allowed therefore.

Failure to comply with this section shall result in a penalty assessment imposed of up to $10,000 per violation at the City’s discretion.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. - Add the following paragraph:

Contractor shall notify Underground Service Alert (USA) at 1 (800) 227-2600, two working days prior to starting work, and must submit verification number to the City prior to starting work. 6-1.2 Commencement of the Work. - Amend the second sentence as follows:
“The work shall start within 10 days thereafter, and be diligently prosecuted to completion within the Contract Time.”
6-3 TIME OF COMPLETION.
6-4.1 General. - Add the following paragraphs:

If saturated soil is encountered during construction due to leaks in an existing utility, contractor shall remove saturated material and replace with a suitable backfill material until adequate compaction can be attained by verification from the City's Geotechnical Engineer.

Prior to any removal of saturated material, contractor shall discuss the methods of remediation with the City's representative. Approval from the City, or the City's representative, shall be obtained for any amount of saturated material removal in which the contractor anticipates to be compensated for, if approval is not obtained all costs shall be borne by the contractor.

Up to a 14 day delay in paving operations may be requested after all leaks have been resolved to provide time for excess moisture to dissipate, at no additional cost to the city, in lieu of removing and replacing the saturated soil. A no cost change order will be prepared to provide the contractor with additional contract time if such delay is requested by the City. 6-9 LIQUIDATED DAMAGES. The value of liquidated damages noted in this section is amended to five hundred dollars ($500) per working day.
6-10 NOTICE AND SERVICE THEREOF. Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:

GC 31
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the project site, or by deposing the same in the United States Mail enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of work under this Contract, certified and with postage prepaid.

Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated by him to the party giving the notice, certified and with postage prepaid.

Notice shall be given to the Owner by personal delivery thereof or by depositing the same in the United States Mail enclosed in a sealed envelope, certified and with postage prepaid. The address of record for the owner is:

City of Redlands
Municipal Utilities & Engineering Department
P.O. Box 3005
35 Cajon Street, Suite 15A
Redlands, CA 92373
6-11 PUBLIC RECORDS ACT. All documents, Plans, specifications and all other information relating to the conduct of the City’s business, including information submitted by the Contractor, shall become the exclusive property of the City and except as provided by law shall be deemed public records. Said information shall be subject to the provisions of the California Public Records Act (Government Code Sections 6250 et seq.).

Under no circumstances will the City be responsible or liable to the Contractor, submitter or any other party for the disclosure of any records or information submitted to the City, regardless of whether such records or information are labeled “Trade Secret”, “Confidential”, or “Proprietary” (or words to similar effect) and regardless of whether the disclosure is required by law or a court order or occurs through inadvertence, mistake, or negligence on the part of the City or its officers, employees, and/or Contractors.

The City will not advise as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definition of “Trade Secret”. The submitting party shall be solely responsible for all determinations made under the Act, and where appropriate for clearly and prominently marking each and every page or sheet of information with “Trade Secret”, “Confidential”, or “Proprietary”. Each submitting party is advised to contact its own legal counsel concerning the California Public Records Act and its applicability to the submitting party’s own circumstances.

In the event of litigation concerning the disclosure of any information submitted by the submitting party, the City’s sole involvement will be as a stakeholder, retaining the information until otherwise ordered by a court. The submitting party, at its sole expense and risk, shall be responsible for any and all fees and costs for prosecuting or defending any action concerning the information, and shall GC 32
indemnify and hold the City harmless from all costs and expenses including attorneys’ fees, in connection with such action.

SECTION 7 - MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.2 Partial and Final Payment. - Delete and replace with the following:

The closure date for the purpose of making monthly progress payments shall be assigned by the Engineer during the pre-construction meeting. Payment, less deductions, unearned work and retention, will be made within 30 days of the closure date. If a dispute exists between the City and the Contractor regarding an item included in the Contractor's Monthly Progress Payment Request, progress payments will be withheld until said dispute is resolved, in which case longer period of time will be required to make such payment. No such payment shall be required to be made, when in the judgment of the Engineer, the total value of the work since the last estimate amounts to less than $500.

If, in the opinion of the Engineer, work is not progressing according to the approved schedule, payments may be withheld until the Contractor returns to the approved schedule.

Deductions will be made for: (1) amounts due the Owner for equipment or material furnished or services rendered; (2) amounts due the Owner under the terms of the Contract; (3) amounts of any claims of lien filed with the Owner; (4) accrued amounts of liquidated damages; (5) amounts required to be deducted by Federal, State or local governmental authorities. From the balance thus determined will be deducted the amounts of all previous payments, and the remainder shall constitute the monthly payment due the Contractor.

A retention of five percent (5%) will be withheld from each and every progress payment to the Contractor. This percentage will remain constant throughout the duration of the Contract. The City shall make a progress payment within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor pursuant to Public Contract Code section 20104.50.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

As provided by paragraph 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the City to ensure performance under the Contract.

Substitute securities shall be deposited in a financial institution in a form acceptable to the City of Redlands. The financial institution shall be located within the City limits of the City of Redlands.

The Escrow Agreement to be used is set forth in Public Contract Code section 22300. 7-3.3 Delivered Materials. - Delete and replace with the following:

No payment will be made for materials or equipment delivered but not yet incorporated in the work.

GC 33
7-4.2.6 Extras. Without invalidating the Contract, the City may order extra work or make changes by altering, adding or deducting from the work, the Contract sum being adjusted accordingly and the consent of the Surety being first obtained where necessary or desirable. All the Work of the kind bid upon shall be paid for at the price stipulated on the proposal, and no claims for any extra work or material shall be allowed unless the work is ordered in writing by the engineer and the price is stated in such order.
7-4.2.7 Claims for Extra Costs. No claim for extra work or cost shall be allowed unless the same was done in pursuance of a written order by the Engineer, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of the General Conditions, the Contractor shall furnish satisfactory bills, payrolls, and vouchers covering all items of cost and when requested by the City, give the City access to accounts relating thereto.

After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of the thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.

SECTION 8 - FACILITIES FOR AGENCY PERSONNEL
This section is deleted in its entirety.

SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES
CLAIMS
9-1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the City all rights, title and interest and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with section 16700 of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this public works agreement. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the Parties.

SECTION 10 - TRENCHING AND EXCAVATION
10-1. If this contract involves digging trenches or other excavations that extend deeper than (4) feet below the surface, the following shall be done pursuant to California Public Contract Code Section 7104:

A. That the Contractor shall promptly and before the following conditions are disturbed, notify the City in writing, of any:

GC 34
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law. (2) Subsurface or latent physical conditions differing from those indicated. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

B. That the City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor’s cost of, or the time required for, performance of any part of work shall issue a change order under the procedures described in the contract.

C. That, in the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law which pertains to the resolution of disputes and protests between the contracting parties.

SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF

EXISTING UTILITIES
11-1. Pursuant to Government Code Section 4215 et seq, the City shall assume the responsibility between the parties to this contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of the construction project for this contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids.
11-2. The Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not identified in the plans and specifications with reasonable accuracy and for equipment on the project necessarily identified during such work.
11-3. The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the City, or the owner of the utility to provide for removal or relocation of such utility facilities.

11.4. The City shall not be required to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the construction project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on adjacent to the site of construction, provided, however, nothing herein shall relieve the City from identifying main or trunk lines in the plans and specifications.

GC 35

11.5. Nothing herein shall preclude the City from pursuing appropriate remedy against the utility for delays which are the responsibility of the utility.

11.6. If the Contractor, while performing the contract, discovers utility facilities not identified by the City in the contract plans or specifications, Contractor shall immediately notify the City and the utility in writing.

11.7. The public utility, when it is the owner, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price.

11.8. Contractor shall comply with Government Code Section 4216 through 4216.9.

11.9. Conduits from existing street light and traffic signal systems may be encountered during construction of this project. All removals, relocations, and/or replacements of existing conduit systems shall be performed in accordance with these specifications and City standards, by a qualified electrical contractor. All costs for said work shall be borne by the Contractor and paid as a part of the various items of work requiring such removals, relocations, and/or replacements, and no other compensation shall be made therefore.

SECTION 200 - ROCK MATERIALS
200-2 UNTREATED BASE MATERIALS.
200-2.1 General. - Amend the first paragraph as follows:
“Materials for use as untreated base or subbase shall be classified in the order of preference as follows:

Crushed Aggregate Base
Crushed Miscellaneous Base
Pulverized Miscellaneous Base.”
200-2.4.1 General. - Delete the second sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.4.2 Grading. - Amend the first sentence of paragraph 1 as follows:
“The material shall be uniformly graded and shall conform to the ‘fine’ gradations:” 200-2.5.1 General. - Delete the third sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.8.1 General. - Amend as follows:

Delete the second sentence of paragraph 1 and replace with the following:
“Pulverized miscellaneous base may contain underlying base material.” Delete the third sentence of paragraph 1 and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” GC 36
SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.1 General - Add the following paragraph:

The Contractor shall furnish the Engineer in the field with a copy of the mix design to be used, and with a legible certified weighmaster's certificate for each load of PCC delivered to the project.

PCC delivered to the project site having a water content and/or slump greater than that specified in the mix design, shall be rejected and removed from the project site. 201-1.1.2 Concrete Specified by Class and Alternate Class - Amend Table 201-1.1.2.(A) as follows:

Street Surface Improvements section -
All concrete in this section shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.

Sewer & Storm Drain Facilities section, Sidehill Surface Drainage Facilities subsection - All concrete in this subsection shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.
201-1.4.3 Transit Mixers. - Replace the first sentence in paragraph 6 with the following:

The total elapsed time between addition of water at the batch plant and the completion of the discharge of the PCC from the mixer, shall not exceed ninety (90) minutes. All PCC remaining in the mixer, after said ninety (90) minutes time limit, shall be rejected and removed from the project site.

SECTION 203 - BITUMINOUS MATERIALS
203-3 EMULSIFIED ASPHALT.
203-3.1 General. - Modify the section by adding the following:

Asphalt emulsion shall be a QUICKSET ANIONIC OR CATIONIC EMULSIFIED ASPHALT conforming to the requirements of Subsection 203-1.3, “Test Reports and Certification”, and Subsection 203-1.2, “Testing Requirements” of the Standard Specifications.

The latex additive shall be Ultra Pave 70 (for anionic) or Ultra Pave 65 K (for cationic) or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water. The latex shall be added at a rate of two to two-and-one-half (2 to 225) parts to one-hundred (100) parts of emulsion by volume. 203-5 SLURRY SEAL.

GC 37
203-5.1 General. - Delete the sentence and replace with the following:

Slurry seal shall be emulsion-aggregate slurry (EAS) conforming to 203-5.4. 203-5.2 Mix Design. - Modify the section by adding the following:
(f) Admixtures, such as Portland Cement or aluminum sulfate may be mixed into the slurry material to adjust curing time such that the applied slurry can support vehicular traffic within 60 minutes.
(g) Use of slag shall not be permitted.
(h) Deliveries of aggregate and emulsion shall not be made without the engineer present.

Emulsion is not to be transferred to an on-site storage tanker without the sieve test performed by the City.
203-5.3.2 Grading. - Delete the sentence and replace with the following:

The combined aggregate gradation shall be determined in accordance with ASTM C136 and conform to Type II requirements shown in Table 203-5.3.2 (A). 203-5.4.1 General. – Modify the paragraph and replace with the following:

EAS shall be a stable mixture of emulsified asphalt, aggregate, water, a set control agent, and latex.

EAS shall be Type II-CQS-1h-EAS.
203-5.4.2.1 Aggregate. – Delete the sentence and replace with the following:

Aggregate shall be Type II conforming to 203-5.3.
203-5.4.2.2 Emulsified Asphalt. – Modify the first paragraph and replace with the following:

Emulsified asphalt shall be quick-set, and contain latex. Quick-set emulsified asphalt shall be CQS-1h conforming to 203-3.
203-6 ASPHALT CONCRETE.
203-6.1 General. - Add the following paragraph:

Unless otherwise approved by the Engineer, asphalt concrete for paving shall be C2-PG 64-10 (1/2”) for finish paving or B-PG 64-10 (3/4”) for base paving. Asphalt concrete for Type D1 or Type D2 curb shall be D2 –PG 70-10.

SECTION 206 - MISCELLANEOUS METAL ITEMS
206-7 TRAFFIC SIGNS.
206-7.1 General. The Contractor shall furnish or relocate and erect all traffic signage as required and specified.

GC 38
All new traffic signage shall be a minimum of the encapsulated lens (high intensity) type, have an anti-graffiti protective covering and be installed on new posts. All traffic signage to be relocated shall be installed on new posts.
206-7.2 Protective Covering. Anti-graffiti protective covering shall be Type 1150-POF, manufactured by 3M Company, or approved equal.
206-7.3 Post and Base. New posts and bases shall be Ultimate Sign Support System as manufactured by Western Highway, or approved equal.

SECTION 207 – GRAVITY PIPE
207-2 REINFORCED CONCRETE PIPE (RCP).
207-2.1 General. - Add the following sentences to paragraph 2:

The minimum D-load for any RCP shall be 1,350. The minimum size for RCP shall be 18 inches (457 mm) unless otherwise approved by the Engineer.

SECTION 211 - MATERIAL TESTS
211-1 COMPACTION TESTS.
211-1.4 General. The Contractor shall be responsible for all quality control for all work. The Contractor shall complete all necessary testing to ensure the quality requirements within the specifications are achieved. The Contractor shall conduct the compaction testing by a geotechnical engineering firm and the results of the testing shall be made available to the Engineer.

The City will complete assurance testing throughout the project by an independent testing firm.

The City will perform the first compaction test required at any location. If such test does not meet the required specifications, the City will make additional tests until the required compaction is obtained and withhold from the final payment due the Contractor, the cost of all such additional tests. To be acceptable, tests must be ordered and witnessed by the City. Tests will be ordered by the City and performed at a location and depth as directed by the City. The Contractor shall assist the City in performing these tests as necessary. The Contractor shall provide to the City the maximum dry density and the optimum moisture content results of backfill and bedding material when requested by the City.

SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS
214-4 PAINT FOR STRIPING AND MARKINGS.
214-4.1 General. - Amend the first sentence in paragraph 4 as follows:
“Glass beads conforming to 214-3 shall be mechanically applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
GC 39
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General. - Amend as follows:

Amend paragraph 3 as follows:
“The natural ground surface shall be cleared of all vegetable growth, such as trees, logs, upturned stumps, roots of downed trees, brush, grass, weeds, shrubs, ground cover, tree stumps, decorative landscape rocks, edging, railroad ties, other decorative landscape treatments, boulders, rock, portland cement concrete, and all other objectionable materials, within the limits of construction.” Add the following paragraphs:

Grubbing and removal of organic debris shall include the repair and/or replacement of all parkway irrigation piping and systems necessary to perform work on this Contract and capping pipelines until such time that permanent repairs and/or replacements have been made.

All debris removed from the project site under this item shall be disposed of at an approved dump site. All transportation costs and dump fees shall be borne by the Contractor.

Clearing and Grubbing shall include, but is not limited to, the following:

1. Removal of existing AC berms.

2. Removal of all curb and gutter, cross gutters, and spandrels shall be replaced within three (3) calendar days. The Asphalt Concrete patch for areas with curbs and gutters removed and replaced shall be placed within two (2) working days after the curb and gutter, cross gutters, and spandrels are replaced. Removal of all sidewalks shall be replaced within three (3) calendar days.

3. Saw cut and removal of poles, posts, PCC pavements, curb, gutter, and sidewalk. Holes resulting from removal of existing poles and posts from existing PCC, AC pavements and curbs and gutters, shall be filled or patched with like materials. Self-propelled drop hammers will not be allowed for removals.

4. Removal of all raised pavement markers not conforming to the approved plan or conflicting with the proposed striping as shown on the plans in accordance with Subsection 312-3, Removal, of the Standard Specifications.

5. Removal and disposal of boulders, rock or PCC.

6. All trees and shrubs less than 3m (9 ft) directly above the entire sidewalk surface shall be trimmed and removed by the contractor to allow a clear path of travel for pedestrians.

7. Irrigation system relocation:

GC 40
Any irrigation systems in conflict with the proposed improvements that are removed, damaged, disturbed, or broken shall be modified, repaired, and/or replaced to be operable and provide full irrigation coverage to the areas requiring irrigation using new materials, equal or better than the original materials, with 20 mm (3/4 in) Schedule 40 PVC being the minimum acceptable for underground lines and 13 mm (1/2 in) Schedule 80 being minimum acceptable for risers and with the systems not being out of operation for more than two (2) days. No payment for work associated with the irrigation repair will be released, until all irrigation is complete, operable and accepted by the City.

All trees, shrubbery and lawns deprived of normal irrigation watering due to a disruption of service caused by the Contractor’s operations shall be regularly and thoroughly irrigated by the Contractor so that said plantings will not be damaged. If any trees, shrubbery or lawns die or suffer unacceptable damage as a result of or precipitated by the Contractor’s operations the Contractor shall replace same with the same plant species and size. Existing grass lawns within areas that must be excavated and/or re-graded shall be cut into approximate 305 mm (1 ft) squares, removed, protected, cared for and replaced as soon as possible. Dead, dying, and unacceptably damaged grass shall be replaced with new grass sod.

8. Existing inlets, slotted drains, drainage pipes, concrete gutters, drainage pipes, where any portion of such structure is within 1m of the grading plane in the excavation areas, or within 300 mm (1 ft) of original ground in embankment areas, or where shown on the plans to be removed, shall be completely removed and disposed of accordingly.

9. Removal and disposal of existing drainage inlet structure and PCC or AC apron.

10. The Contractor shall dispose all materials not being salvaged outside of the right-of-way and shall pay for all costs for disposal.

11.Removal and disposal of any abandoned utilities that may interfere with the improvements.

12.Self-propelled drop hammers will not be allowed for removals. 300-1.3.1 General. - Add the following paragraphs:

The Contractor shall dispose portland cement concrete, stone rubble, and brick at an approved dump site.

All reprocessed asphaltic cement concrete may be placed as the lower course of crushed aggregate base material. If the Contractor chooses not to reprocess the material, disposal at an approved dump site shall be required. All costs for disposal shall be borne by the Contractor. If the Contractor chooses to reprocess material, it shall be protected and remain contaminate-free, otherwise disposal at an approved dump site will be required with all costs borne by the Contractor.

All reprocessed asphaltic cement concrete to be used as crushed aggregate base shall be ground to conform to Section 200-2.2.

GC 41
300-1.3.2 (a) Bituminous Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cutting of edges to be joined shall be with a power-driven saw. The groove shall be cut to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“Where bituminous pavement is to be removed, a cold mill header cut of maximum 6 feet (1.8 m) in width perpendicular to the join line shall be made, and a minimum laying depth of 1 inch (25mm) of new pavement material shall be provided at the join line.” Amend the fourth sentence as follows:
“The edges of existing concrete pavement adjacent to the trench shall be saw cut to neat straight lines for the purpose of removing the damaged pavement areas.” Add the following sentence:

Work under this item shall include asphalt concrete berms. 300-1.3.2 (b) Concrete Pavement. - Amend the following:

Amend the second sentence as follows:
“Saw cuts shall be made to a minimum depth of 4 inches (102 mm).” Amend the third sentence as follows:
“If a saw cut in concrete pavement falls within 5 feet (1.5 m) of a construction joint, cold joint, expansion joint, or edge, the concrete shall be removed to the joint or edge.” 300-1.3.2 (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways and Alley Intersections. - Amend the following:

Amend the first sentence as follows:
“Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“No section to be replaced shall be smaller than 36 inches (1 m) in either length or width.” Amend the fourth sentence as follows:
“If the saw cut in sidewalk or driveway would fall within 36 inches (914 mm) of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within 12 inches (300mm) of a score mark, the saw cut shall be made in and along the score mark.”
Amend the fifth sentence as follows:
“curb and gutter shall be sawed to a depth of 4 inches (102 mm) on a neat line at right angles to the curb face.”
GC 42
300-1.3.2 (d) Striping and Markings. All existing striping, markings and raised pavement markers shown to be removed or necessary to be removed from paving areas. This item includes removal in compliance with applicable laws and cleanup of residue from the operation.

All striping, markings and raised pavement markers removed beyond the limits shown on the plans for and/or at the convenience of the Contractor shall be replaced at the Contractor’s expense. 300-1.3.2 (e) Structures. All existing concrete structures (reinforced or non-reinforced) as shown on the plans to be removed or abandoned, including but not limited to, undersidewalk drains, manholes, headwalls, bulkheads, drop inlet structures, energy dissipaters, catch basins, vaults and pipelines. Abandonment shall include all cuts and concrete plugs necessary to seal ends or openings of abandoned pipes or structures.
300-1.3.2 (f) Rock Curbs. All rock from rock curb removals, as shown on the plans or required for construction of the project, shall be transported, delivered and unloaded at a storage site as directed by the Engineer.
300-1.3.2 (g) Miscellaneous Removals. All other removals of facilities, as shown on the plans but not covered under separate bid items, and any underground facilities found during the work and not shown on the plans shall be performed. The City has endeavored to show all known underground facilities but is not responsible for unknown or abandoned facilities. Unknown underground facilities shall be paid as extra work.
300-1.3.2 (h) Miscellaneous Relocations. All relocation work as shown on the plans or required for construction of the project, but not covered under separate bid items, shall be included as a part of Subsection 300-1 Clearing and Grubbing. All relocation work performed as a part of clearing and grubbing work shall conform to the requirements and specifications of the agency or utility having jurisdiction over the item to be relocated.
300-1.4 Payment. - Add the following sentence to paragraph 1:

Payment for work on this item shall be made as a percentage of the work completed at each monthly payment.
300-2 UNCLASSIFIED EXCAVATION.
300-2.2.2 Wet Material. - Amend the second sentence of the paragraph:
“If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the contract, the work involved will be paid for in the following manner: Over-excavation and disposal work shall be considered “extra work,” with backfill and compaction of crushed aggregate base paid under the appropriate bid item in these specifications.”
300-12 MISCELLAENOUS GRADING. The parkway, whether landscaping exists or not, shall be graded and compacted to achieve drainage towards the street at a slope of 2%. Grading shall be coordinated such that it is the last item of work to be completed, prior to site clean-up. Loose material and dirt shall be raked, compacted and distributed throughout the parkway area. Areas GC 43
adjacent to installed improvements must be graded to a level within one inch from the finished surface. Extra dirt/fill shall be removed from the project in accordance with Specifications.

The Contractor, at his expense shall photo-document pre-construction conditions prior to starting excavating. After construction is completed, the Contractor shall photo-document the finished grade. The Contractor shall provide the City with said photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc). The Contractor shall keep a copy of the photos (either electronically or hard copy) and provide the City with electronic copies of the photos.

SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND

PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.3 Relative Compaction. - Amend the second sentence of paragraph 1 as follows:
“When base material, curb, gutter, alley pavement, driveways, or sidewalks are to be placed on the subgrade material, the top 6 inches (150mm) of such subgrade material shall be compacted to a relative compaction of 95 percent.”
301-2.1 General. – Add the following paragraphs:

The contractor shall use ‘crushed aggregate base’ or ‘crushed miscellaneous base, fine graded’ as the base material. The use of ‘processed miscellaneous base,’ ‘select subbase,’ or ‘disintegrated granite’ shall not be used as base material.

The contractor may use ‘pulverized miscellaneous base’ (grindings) as part of the crushed base material. Said grindings shall be uncontaminated and placed in an even thickness as the lower course of crushed base material. Spreading and compacting shall comply with Sections 301-2.2 and 301-2.3.
301-2.3 Compacting. – Amend the second sentence of paragraph 3 as follows:
“Compaction in the excepted areas shall be as specified in 211-1 with each layer of compacted base material having a minimum relative compaction of 95 percent.” 301-2.4 Measurement and Payment. – Add the following paragraph:

Payment shall be made for cold-planing, storing, placing, and compacting reprocessed asphalt concrete pavement (grindings) as part of the crushed aggregate base (CAB) material. The volume of grindings placed shall be figured and a tonnage figure computed using 9.35 kg/m^3 (150 pounds per cubic foot). This tonnage figure shall be paid as part of the crushed aggregate base tonnage for this project.
301-7 FULL DEPTH RECLAMATION WITH MECHANICAL STABILIZATION (FDR25) 301-7.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per GC 44
plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 25 ksi.

The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.
301-7.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of roots, weeds, wood, and construction debris. All grass and other vegetation shall be removed from the edge of the exiting pavement or lip of gutter pan to prevent contamination of the pulverized bituminous material during the milling operation.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-7.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout
Final subgrade surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized asphalt material must be used as base material to meet new cross slope requirements.

Native sub-grade material may need to be hauled off to allow for the use of all pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.

GC 45
301-7.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture prior to shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding. 301-7.5 Finishing. The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits. 301-8 FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION (FDR-200) 301-8.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 200 ksi.

The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present, and adding cement. Micro-cracking of the completed cement stabilized surface is required before HMA is to be placed directly on top of the cement treated surface, regardless of the AC thickness. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.

The cement content must be 2% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 6” FDR section. The cement content must be 3% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 9” FDR section. The cement content must be 4% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 12” FDR section. Cement must be Type II or Type V Portland cement specified in ASTM C 150/150M. 301-8.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt GC 46
concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of grass and vegetation, and construction debris to prevent contamination of the pulverized materials. Mixing shall continue until, and at the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials are achieved.

Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications. Excess pulverized material shall consist of non-treated well mixed pulverized AC pavement and subgrade.

Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.

Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-8.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:

1. Clearing foreign matter including vegetation

2. Removing standing water

3. Referencing the profile and cross slope

4. Marking the proposed longitudinal cut lines on the existing pavement as follows:

4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way

4.2. Cut lines must indicate the sequence of the cuts

5. Referencing existing lane lines and striping layout
Final pavement surface shall slope away from the street centerline to a maximum of 3% grade.

Pulverized material must be used as base material to meet new cross slope requirements. Native sub-grade material may need to be hauled off to allow for the use of all the pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.
301-8.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture before shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.

Recycling shall be performed to the depth provided in the plans, while incorporating stabilizing agents, mineral filler, additional aggregate and water. Mixing shall continue until, and the speed GC 47
of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials is achieved. Pre-cutting, grading and light compacting of the recycled material shall be performed prior to incorporation of the stabilizing. Spread cement uniformly over the full roadway surface width. Do not spread cement more than 30 minutes before mixing. Do not apply dry cement in windy conditions that will result in dust outside the FDR with cement area. The application rate must be the mix design rate or the ordered application rate in lb/sq yd ±

0.5 percent. The application rate of all stabilizing agents shall be continuously monitored. If the measured application rate falls outside the above tolerance, then the recycling operations shall be stopped and corrected before proceeding. Do not spread cement and aggregate before pulverizing.

Water must be injected through the pulverizing machine. The injection rate of mixing water must be sufficient to produce the FDR with cement material mixing moisture content. The water content of the stabilized material shall be monitored closely to ensure proper compaction. Mark where the center of the pulverizing drum stops. Start the following cut on this alignment at least 2 feet behind the mark. Before compacting, remove solids larger than 3 inches in any dimension by hand.

Immediately after pulverizing and mixing, compact FDR with cement to the minimum relative compaction. Do not allow more than 2 hours between final mixing of the pulverized material with cement and completion of initial compaction before trimming. During grading and final compaction add water to maintain the mixing moisture content as described in the mix design. Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to completion of final compaction after trimming.

Longitudinal joints between adjacent stabilization passes shall be overlapped at least 4 inches.

Transverse joints between the recycling process shall be saw-cut, if necessary, to provide a vertical clean face to ensure proper compaction. Compaction of cementitious stabilizer begins within 20 minutes after mixing and achieving gradation and moisture requirements.

According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.

The relative compaction of each layer of compacted base material shall not be less than 95 percent.

ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.

Construction joints shall have vertical faces and shall be made in thoroughly compacted material.

Additional mixture shall not be placed against the construction joint until the joint has been approved by the Engineer. The face of the cut joint shall be lean and free of deleterious material and shall be kept moist until the placing of the adjacent FDR with cement. 301-8.5 Finishing. Once the entire working width (full lane width plus effected shoulder width) has been stabilized, and only after primary compaction has been completed, the entire working GC 48
width shall be graded to the required profile and cross-slope. Disturbance to the stabilized and primary compacted material shall be kept to a minimum during this grading and shaping operation.

The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.

Immediately after compaction, apply water and roll with no vibration. The finished surface must be free of ruts, bump, indentations, segregation, raveling, and any loose material.

The completed cement treated subgrade shall be moist cured continuously until it is in a firm and unyielding condition. The cement treated subgrade shall be kept free from heavy traffic during the curing period or until the asphalt concrete surfacing is placed whichever is less, unless otherwise directed by the Engineer. Moisture curing shall be the only method of curing prior to microcracking.

Micro-cracking shall be performed with several vibratory roller passes 48 to 72 hours after finish grading to prevent severe, wide cracks from forming thus reduces the potential for reflective cracking through the HMA layer. Micro-cracking shall be performed before the application of asphaltic emulsion curing seal. After micro-cracking is complete additional moisture curing may be used. Any additional water required to achieve maximum density shall be applied by spraying the surface of the stabilized material with light applications. Care shall be taken so as not to overapply additional water to any areas of the stabilized material.

While open to traffic and before placing HMA, maintain the FDR with cement surface free of ruts, bumps, indentations, raveling, and segregation. If FDR with cement material is damaged, it shall be repaired by removing and replacing the entire depth of affected layers in the damaged area.

Feathering will not be permitted for repair of low areas.

Asphaltic emulsion curing seal must be applied on the completed cement treated base immediately before placing HMA. Asphaltic emulsion curing seal must comply with Caltrans Standard Section 94, Grade SS1 or CSS1. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must no cause premature separation of the emulsion. Uniformly apply the diluted curing seal at a rate of 0.1 gal/yd2 of cement treated base surface.

SECTION 302 - ROADWAY SURFACING
302-4 SLURRY SEAL SURFACING.
302-4.3.1 General. – Add the following paragraphs:

All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.

GC 49
Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.

The Contractor shall provide a drive upon scale at the project site or an alternate site approved by the City. The drive on scale shall show the net weight of the aggregate bin on each slurry machine before the machine and product will be approved for applying slurry on the project.

All slurry machines are to carry, at all times, a calibrated emulsion measuring stick. The emulsion measuring stick is to be calibrated in 10-gallon increments to the slurry machine it is used on.

Emulsion measuring sticks from other slurry machines will not be allowed to measure the gallons of emulsions on the slurry machines they were not calibrated to. The emulsion measuring stick is to have the slurry machine number or identification permanently marked on the stick. The gallons of emulsion are to be measured with a calibrated emulsion measuring stick and recorded before leaving and after returning to materials site. Use of a slurry machine will not be allowed if it does not have a calibrated emulsion measuring stick.

The Contractor shall furnish prior commencing work, a calibrated stick in 10-gallon increments to measure the oil in the trailer storage tanks in gallons. The measuring stick shall be calibrated to the trailer storage tank it is used on. The inspector shall check the oil in each load “in and out” and in the storage tanks at the beginning and end of each day to determine the amount of emulsion used for that day. Emulsion is not to be transferred from delivery tank to on-site storage tank before the City performs the sieve analysis on the emulsion. Aggregate used in the slurry shall not exceed a moisture content of four percent (4%) by weight of dry aggregate.

Contractor may not schedule more than 150 tons of slurry to be placed per day. Slurry may not be applied at more than 150 feet per minute.

The Contractor shall provide a self-propelled 10 ton pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system. The Contractor shall roll the required streets the same day they are slurried. The Contractor will be responsible for proper scheduling of the work such that the rolling can be properly done within the given time constraint. Failure to comply shall result in a $250.00/calendar day liquidated damage being assessed per incident. The cost of furnishing the roller and operator shall be included in the price paid for slurry seal.

The Contractor is hereby advised that City streets, parking lots, or other City-approved property will not be allowed as a site for stockpiling and batching. Arrangements for an acceptable site shall be the sole responsibility of the Contractor.

The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and reslurried with a Type I mixtures (Local Streets) or a Type II (Arterial/Collector Streets) at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.

The Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least fourteen (14) calendar days prior to slurrying. The herbicide mixture GC 50
shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to slurrying. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for slurry seal.

Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if they do not adversely affect the slurry seal. Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3 inches. Use a material, such as building paper at transverse joints and over previously placed slurry seal to prevent double placement.

Remove the material after use. Use hand tools to remove spillage.

Full compensation for developing a water supply, for furnishing and placing all water required for work done in the Contract, including extra work shall be included in the prices paid for the various items of work requiring water; and no separate payment will be made therefore. The Contractor shall supply the City with licensed weighmaster’s certificates of weight for all delivered aggregates to the job during the course of each day. Aggregate shall be delivered to the project only in the presence of a City representative. The Contractor shall also present weighmaster certificates for the amount of such aggregate remaining at the completion of the project at no cost to the City.

Payment shall be determined by the amount that is physically placed, which cannot exceed the amount that is delivered to the job site with the certified weighmaster tickets. There shall be not outside work done utilizing materials from the tanks or stockpiles stored for the City’s Contract.

Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.

Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.

The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.

The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately comply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer. 302-4.8 Spreading and Application. - Add the following paragraphs:

Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the street surface with a power sweeper, remove all R.P.M.’s, abrasive grind or sandblast completely all lane lines, street legends, crosswalks or other painted or thermoplastic surfaces. This is necessary to provide a good bonding surface for the slurry seal, as well as eliminate “ghosting” of the old striping and markings as the new slurry wears off over time.

GC 51
It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at their own expense, to provide for and protect the work from such water. In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.

Slurry shall not be applied when the atmospheric temperature is less than 65oF (18oC).

The application of slurry shall not commence until after 8:00 a.m., and shall conclude at 1:30 p.m. unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The portions of streets to be slurried shall be closed from the time the application begins until the mixture as achieved sufficient set to be opened to traffic.

The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.

The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.

Each slurry crew shall be composed, at a minimum, of a coordinator at the project site at all times, a competent quick-set mixing man, a competent driver, two squeegee men, and sufficient laborers for any handiwork and cleanup.

Surface oil and grease shall be removed or sealed with shellac or an equivalent material approved by the City before the application of the slurry seal. Full compensation for surface oil and grease removal shall be considered as included in the unit cost for slurry seal.

The Contractor shall roll all cul-de-sacs (the last 250’ minimum), the last 250’ of dead-end streets and knuckle curves. Full compensation for rolling the slurry shall be considered as include in the unit cost for slurry seal.

During slurry seal operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, pavement markers (reflective and non-reflective), concrete gutters, concrete cross gutters, and drainage facilities, survey monuments and remove said covering and/for slurry seal coating after slurry sealing has been completed.

The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After application of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day.

GC 52
302-4.8.1 Crack Sealing and Filling. Crack sealing shall be performed prior to the Slurry Seal application. Pavement cracks 1/4" wide and larger shall be sealed. Pavement cracks 1/8" to 1" wide shall be cleared of all loose particles of dust, dirt and laitance with oil-free compressed air immediately preceding the sealing operation. Cracks shall be routed out as necessary to provide a reservoir for the sealer that will have a depth of l" to 1 1/2".

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.
302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General. - Add the following paragraphs:

Asphalt concrete pavement structural sections equal to or greater than 3 inches (76 mm) in thickness shall be installed in two lifts. Base course aggregate material size shall be ¾ inch (19 mm) and cap course aggregate material size shall be ½ inch (13 mm). All pavement shall be placed over 4 inches of crushed aggregate base, unless compacted to 95% relative compaction.

All valves within project limits in the public right-of-way shall be raised to finish grade as a part of this work. The Contractor shall furnish and install new can or slip can materials as necessary.

If new water valve lids are necessary, they shall be supplied by the Municipal Utilities and Engineering Department. All valve can lids within the project limits in the public right-of-way shall be painted the appropriate color for the utility they represent (ie. Water - Blue, Gas - Yellow, Fire – Red, etc.).
302-5.2 Timeline of Paving Operations.

All paving operations shall follow the timeline and requirements shown below unless otherwise approved by the City:

GC 53

PAVING TIMELINE

DESCRIPTION OF WORK

TIME PERIOD
WEEK 1
(DAY 1-7)
WEEK 2
(DAY 8-14)
WEEK 3
(DAY 15-21)
WEEK 4
(DAY 22-28)
PAVING (START TO FINISH) (1)
CURE PERIOD (2)
MANHOLE ADJUST TO GRADE (3)
STRIPING & PAVEMENT MARKINGS (4)
TRAFFIC LOOPS (5)
NO PARKING SIGNS ALLOWED (6)
Note: All time periods shown above are the maximum amount of allowable time for each activity.

This timeline does not apply to the installation or repair of curb and gutter, ac dikes, sidewalks, cross gutters, curb ramps, driveway approaches or truncated domes. (1) In no case shall any street segment remain unpaved longer than three calendar days if no other work activity is being performed on that street segment. Any deviation from the timeline shall result in a penalty assessment of $1,000 per calendar day. (2) No work except cat tracking of proposed striping is allowed during this period; therefore “No Parking Signs” shall not be installed during this activity. (3) Once each manhole is exposed, all associated work to adjust it to grade must be completed within 48 hours. This shall include all adjustments of manholes, vaults, valve cans, etc. as required by the Contract.
(4) All cat tracking and approval of proposed striping shall occur during the cure period. (5) Traffic loops must be installed after the approval of striping layout and prior to the installation of thermoplastic striping and pavement markings. (6) “No Parking Signs” shall be installed per Section 7-19 of these specifications. 302-5.4 Tack Coat. – Delete and replace with the following:

If the asphalt concrete pavement is being constructed directly upon an existing hard-surfaced pavement, a tack coat of High Performance Seal (HPS) No-Track Tack at an approximate rate of

0.05 gallon per square yard shall be uniformly applied upon the existing pavement preceding the placement of asphalt concrete. The surface shall be free of water, foreign material, or dust when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise approved by the Engineer.

GC 54
302-5.5 Distribution and Spreading. – Add the following:

Unless otherwise permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widening, turnouts, left-turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes are changed, the top layer for the through lanes shall be paved first. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed or unless directed by the Engineer.

All screed extensions for paving machines shall be provided with a tamper, roller, or other suitable compacting devices.

Asphalt pavers shall be equipped with automatic screed controls and a sensing device or devices.

Automatic grade and slope control shall be used for overlays.

All joints shall be sealed after rolling.

When placing asphalt concrete to the lines and grades noted in the plans or as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 ft. The ski device shall be a rigid one-piece unit and the entire length shall be utilized in activating the sensor. The Contractor may use a laser to control the screed.

When placing the initial mat of asphalt concrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 ft long.

The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.

When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 ft. tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.

Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this section before starting the next day's work.

Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-

5.6.2 - Density and Smoothness, of the Standard Specifications, the paving operation shall be discontinued and the Contractor shall modify his equipment or furnish substitute equipment. A GC 55
drop-off of more than 0.15 ft will not be allowed at anytime between adjacent lanes open to public traffic.

The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 ft. nor less than 5 ft. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
302-5.6.1 General. - Add the following paragraph:

All asphalt concrete pavement abutting portland cement concrete gutters shall match and be flush with the gutter lip when finish rolling is complete.
302-5.6.2 – Density and Smoothness. – Delete and replace with the following:

The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminated by rolling or other means. The use of any equipment that leaves humps, ridges, irregularities or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.

The finished surface shall meet the following smoothness criteria:
• When a 12 foot long straightedge is laid on the finished surface parallel to the centerline of the roadway, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade,
• When a 12 foot long straightedge is laid on the finished surface perpendicular to the centerline of the roadway and extends from edge to edge of a traffic lane, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade.

If the top layer of pavement does not comply with the smoothness specifications shown, remove and replace the entire section or complete a grind and overlay of 1.5 inches or 3 times the aggregate size, whichever is greater. Grind and overlay will be considered as a repair method only when the thickness of the asphalt pavement section is greater than 1.5 inches following the required grinding. Corrected section shall be rectangular to the nearest pavement edge or lane line and to a crosswalk, concrete spandrel or other limits approved by the City. Do not begin corrective actions until the method and limit of correction is authorized by the City. If the tolerances cannot be achieved by the methods described above, the contractor must re-pave the street section, in kind, at their own expenses.

The compaction after rolling shall be a minimum of 91 percent and a maximum of 97 percent of the density obtained on samples compacted with the California Kneading Compactor per California Test 304. Cores will be taken randomly by the City for laboratory testing per California Test 308, Method A at a frequency of three per lot. A lot shall consist of a maximum of 3,000 square yards of asphalt concrete and will be identified in the field by the City. The cores will be GC 56
averaged to determine the percent of maximum theoretical density, as determined by ASTM D2041, per lot to the nearest tenth of a percent.

Reduced payment factors for percent of maximum theoretical density will be per the following table, and will be applied to the entire lot sampled.

Reduced Payment Factors for Percent of Maximum Theoretical Density Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor

91.0 0.0000 97.0 0.0000

90.9 0.0125 97.1 0.0125

90.8 0.0250 97.2 0.0250

90.7 0.0375 97.3 0.0375

90.6 0.0500 97.4 0.0500

90.5 0.0625 97.5 0.0625

90.4 0.0750 97.6 0.0750

90.3 0.0875 97.7 0.0875

90.2 0.1000 97.8 0.1000

90.1 0.1125 97.9 0.1125

90.0 0.1250 98.0 0.1250

89.9 0.1375 98.1 0.1375

89.8 0.1500 98.2 0.1500

89.7 0.1625 98.3 0.1625

89.6 0.1750 98.4 0.1750

89.5 0.1875 98.5 0.1875

89.4 0.2000 98.6 0.2000

89.3 0.2125 98.7 0.2125

89.2 0.2250 98.8 0.2250

89.1 0.2375 98.9 0.2375

89.0 0.2500 99.0 0.2500
< 89.0 Remove and replace > 99.0 Remove and replace
In addition to the reduced payment factors below, all costs associated with the testing of the lot which resulted in values outside of the 91-97 percent range, will be withheld from the final payment due to the Contractor.

Following completion of the testing by the City, the core locations within the asphalt pavement shall be repaired by the Contractor.
302-5.6.3 Tracking. All areas receiving asphalt pavement shall be protected from tracking onto adjacent areas. Do not allow traffic on new asphalt pavement until its mid-depth temperature is below 140º Fahrenheit to minimize the tracking.

A rock dust blotter coat per Section 302-9.7 or a sand coat at a rate of 1-2 pounds per square yard shall be applied to the compacted surface for all areas where tracking is a concern. The application of tracking prevention measures shall be determined by the Contractor.

GC 57
A haul route for all paving operations shall be reviewed and approved by the City prior to the start of any construction activity. No deviations from the approved haul route shall occur unless approved in writing from the City.

All tracking onto adjacent streets, striping or pavement markings shall be the responsibility of the Contractor. All striping and pavement markings shall be removed and replaced in kind by sandblasting. All tracking onto roadway surfaces may require the use of a street sweeper to the satisfaction of the City.
302-5.7 Joints. – Add the following:

Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected. Longitudinal and transverse joints shall be tested with a 12’ straightedge and shall be cut back as required to conform to the provisions in Subsection 302-5.6.2 Density and Smoothness for surface smoothness. Connections to existing surfacing shall be feathered to conform to the provisions for smoothness.

Longitudinal joints in the top layer shall correspond with the edges of proposed lane striping.

Longitudinal joints in all other layers shall be offset not less than 0.5' alternately each side of the edges of traffic lanes.

All feathered joints shall be sealed after rolling.
302-5.9 Measurement and Payment. – Add the following:

Reduced payment factors per 302-5.6.2 will be applied to the Contract Unit Price for lots with a Maximum Theoretical Density less than 91.0 and greater than 97.0 percent. 302-5.10 Hot Asphalt Leveling Course. Areas to receive the Hot Asphalt Concrete Leveling Course shall be determined and defined by the project manager and inspector, and identified to the Contractor in the field. Mix for hot Asphalt Concrete Leveling Course shall be 1/2 inch aggregate, C2, as defined in Section 203-6.4.3.

Areas to receive hot asphalt concrete leveling course shall be areas located near or adjacent to existing curbs and/or gutters that are potholed, or have the lip of gutter higher than the adjacent roadway. Potholes, large cracks, or ruts shall be filled to the surrounding grade elevation and compacted. Hot Asphalt Concrete Leveling Course shall be completed prior to the placement of Type II Slurry Seal, ARAM or resurfacing.

Prior to placement of asphalt concrete, the surface shall be cleaned and all debris and deleterious materials shall be removed. A tack coat meeting the material and application requirements of Section 302-5.4 Tack Coat, shall be applied prior to placement of hot mix asphalt concrete. 302-5.11 Asphalt Pavement Crack Sealing and Filling. Crack sealing shall only be performed as a repair method for conventional hot mix asphalt pavement (HMA) and not installed at project locations which will have asphalt rubber hot mix (ARHM) used as the overlay material. Crack GC 58
sealing shall be performed after milling of existing asphalt surface and prior to any leveling course, if necessary.

Right after milling of existing asphalt and before crack sealing or filling, Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least seven (7) calendar days prior to paving. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to paving. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for paving.

The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).

The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).

A wand and nozzle type application shall be used to fill all cracks with crack sealing material.

Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.

The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES.
303-1.1 General. - Delete the first sentence of paragraph 1 and replace with the following:
“Concrete bridges, culverts, catch basins, retaining walls, abutments, piers, footings, foundations, drainage inlets, head walls, end walls, wing walls, junction structures, transition structures, manholes, and other similar types of portland cement concrete structures shall be constructed to the lines and grades in conformity with the Plans and Specifications. 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1.1 General. - Replace the last paragraph with the following:

GC 59
No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.

All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.

The Contractor shall barricade and protect placed PCC from all damage, marks, mars, and/or graffiti. Any PCC damaged, defaced, discolored, or defective shall be replaced at the Contractor's expense.

When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps. The Contractor is to construct all access ramps in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. If the ramps constructed by the Contractor are found to be in non-compliance with ADA Standards, the Contractor will be required to remove and replace the ramps to ADA Standards at the Contractor's expense.
303-5.1.2 Drainage Outlets Through Curb. - Add the following paragraph:

Coring shall be required for all drains through existing curbs. 303-5.1.3 Driveway Entrances. – Replace the last paragraph with the following:

Driveway approaches where required, shall be 150 mm (6") thick for single-family residential area, and 200 mm (8") thick for commercial driveway approaches. 303-5.1.4 Walk. The back of sidewalk shall be 2 inches from the street Right-of-Way line unless otherwise specified by the Engineer.

Included in the price of sidewalk construction are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished sidewalk surface, as a result of grade differentials from existing ground surface to proposed sidewalk surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times. 303-5.1.5 Access Ramps. Construction of curb ramps shall conform to the Type and Case appropriate for the condition, as specified on the plans and as shown within the 2012 Standard Plans for Public Works Construction, Plan 111-5. The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum slope indicated on the plans or Standard Plan 111-5. The maximum slope for the ramp shall not be exceeded unless otherwise approved in writing by the Engineer. The Contractor shall remove and replace access ramps deemed noncompliant with the plans or Standard Plan 111-5.

For proposed locations adjacent to a cross gutter spandrel, sawcuts along the radius of the curb will not be allowed. The spandrel shall be replaced from expansion joint to expansion joint to the extents of the curb removal. For proposed locations adjacent to curb and gutter, sawcuts along the flowline of the curb will not be allowed. The entire curb and gutter shall be replaced from expansion joint to expansion joint as required. Sawcuts at locations other than the expansion joint GC 60
will not be allowed unless approved by the Engineer. Curb cuts of the existing curb will not be permitted for installation of proposed ramp. Any deviation from these requirements will result in rejection of all work at this location and shall not be included in progress payment requests until corrected, per direction from the Engineer.

The Contractor shall verify the extents of sawcut and removal for each access ramp taking into account the maximum slope and transition area required. It shall be the Contractor’s responsibility to identify required removal limits, set concrete forms and verify maximum slopes are not exceeded. The Engineer shall be present to verify the concrete forms prior to the placement of the concrete at each location, however this does not alleviate the responsibility of the accuracy of forms or slopes of the access ramp from the Contractor.

Included in the price of access ramps are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished ramp surface, as a result of grade differentials from existing ground surface to proposed ramp surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.

Access Ramps shall have truncated domes installed in accordance with standard plans and specifications. Truncated domes on new access ramps shall be Armor-Tile, Cast in Place System, or approved equal. Truncated domes installed on existing surfaces shall be Safety Sted TD, or approved equal. Truncated dome panels shall be 36”x48”, inline configuration, with a spacing of

2.35” on center, and Federal Yellow in color.

The access ramp work shall include all related adjustments of pull boxes, pull box covers, signs, and protection of any underground utilities within the work area. The removal and replacement of up to 5 linear feet of sidewalk on each side of the access ramp shall be included within the cost of the access ramp. The removal and replacement of the sidewalk will allow for transition from the top of ramp to adjacent sidewalk and will be utilized as necessary. 303-5.4.3 Weakened Plane Joints, (a) General. - Add the following paragraph:

All weakened plane joints shall be spaced at a maximum of 3.05 m (10') feet for curbs, gutters, and sidewalks. Scoring lines shall conform to those prevailing in the area and be uniform in spacing.
303-5.5.2 Curb. - Replace the first paragraph with the following:

PCC for curb and gutter shall be placed within three working days from removal of the existing PCC curb and gutter. The curb and gutter surface shall not vary more than 3 mm (0.01') from a 3 m (10') straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 3 m (10') in length, and operated longitudinally over the surface of the concrete. Form clamps shall be constructed so as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1) hour, nor more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and GC 61
face of the finished curb shall be true and straight, and top surface of curbs shall be of uniform width, free from humps, sags, blemishes, or other irregularities. 303-5.5.3 Walk. - Add the following paragraphs:

The sidewalk surface shall not vary more than 5 mm (0.02') from the 3m (10') straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 100 mm (4") thick, except at driveways where the sidewalks shall be a minimum of 150 mm (6") thick for single family residential areas and 200 mm (8") thick for all other areas.
303-5.6 Curing. - Add the following paragraph:

Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4 Concrete Curing Compound, of the Standard Specifications. 303-5.7 Repairs and Replacements. - Add the following paragraphs:

In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.

The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.

Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.

Concrete replacement areas shall be from score mark or control joint to score mark or control joint, and full width of the sidewalk. All replacement areas shall be saw cut. 303-5.8 Backfilling and Cleanup. - Add the following paragraph:

A minimum of 300mm (12”) wide full depth asphalt concrete pavement repair patch and an 450mm (18”) wide 1-1/2” deep grind outside of the trench width is required when cross gutter, spandrel, driveways, curb and gutter is placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be sawcut. All work shall be in accordance with the General Permit Conditions and Trench Specifications, latest edition.

SECTION 304 - METAL FABRICATION AND CONSTRUCTION
304-3 CHAIN LINK FENCE.
304-3.4 Measurement and Payment. - Delete paragraph 1 and replace with:

Chain link fence will be measured along the horizontal projection line of the completed fence, deducting the widths of gates and openings.

GC 62
SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS
314-1 GENERAL. - Add the following paragraphs:

To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during all striping operations. Refer to Section 7-8.6.

Each storm drain catch basin or storm drain inlet box shall be marked “NO DUMPING - FLOWS TO CREEK.” Two coats of paint are required. Stencil shall match City’s stencil. Paint and painting shall comply with the specifications.

All street resurfacing work shall include installing fire hydrant pavement markers at all fire hydrant location, whether the pavement markers were existing or not. The pavement markers shall be Type I – Two-Way Blue Retroreflective per Section 214-6 of the Specifications and installed per City’s detail drawing No. 102-0. All work associated with the installation of all new, or replacement of existing, fire hydrant pavement markers shall be included as noted within the specifications. 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.
314-4.1 General. – Add the following paragraphs:

During construction, if traffic legends or lane striping are removed or paved-over for any reason, they shall be replaced immediately with temporary traffic legends or lane striping as directed by the City, and the Contractor shall place permanent traffic legends or lane striping at the end of the job or on completion of final paving. When permanent items are placed, they shall be complete markings, legends, or striping i.e.: if limit lines are disturbed, they shall be replaced to centerline or from curb to curb, whichever was existing; if a letter in a word is removed or covered, the entire word shall be replaced; and lane striping shall extend 75 feet beyond construction limits. All replacement markings, legends, or striping required to be replaced beyond the contract limits shown shall be at the cost of the Contractor and shall meet City standards. If existing striping or legends are to be removed on existing surfaces, they shall be sandblasted. Painting over striping or legends in lieu of removal will not be permitted. Pavement striping shall comply with the applicable provisions of Sections 214 and 314 of the Standard Specifications.

Where side streets with existing striping, markings and markers are encountered, striping, markings and markers shall be repainted and replaced for a minimum distance of 15 m (50 feet) from the crosswalk, stop bar or limit line.
314-4.2 Control of Alignment and Layout.
314-4.2.1 General. - Delete and replace with the following:

The Contractor will be responsible for all layout of all striping. All striping, markings and markers shall be reinstalled in their existing locations unless otherwise shown on the plans. The Contractor shall be responsible to take appropriate measures and record the existing locations.

GC 63
The Contractor shall verify all dimensions in the field prior to installation of pavement striping/marking layout (Cat-Track). Should field measurements differ from the plan, the Contractor shall immediately notify City staff. No Cat-Track marks shall be placed until discrepancies are resolved.

Cat-Track must be approved by City staff prior to the installation of permanent pavement striping/marking. Contractor shall notify City staff a minimum of 24 hours prior to installation of permanent pavement striping/marking to allow for inspection and approval. If approval of CatTrack is not obtained by the Contractor, all work required to correct the striping/marking will be at the expense of the Contractor
Cat-Track marks shall be made in chalk. Paint for the purpose of Cat-Track is prohibited. If paint is used, the Contractor must remove the paint without damaging or visually deforming the pavement surface. If damage or visual deformity within the removal area occurs, in the opinion of City staff, the Contractor shall grind and overlay the entire segment with no additional compensation. The area of the grind and overlay shall be as required by City staff and shall be a minimum of 0.10’ thickness.

All visible Cat-Track markings after the installation of the permanent striping/marking shall be removed without damage or visual deformity to the pavement surface. Any damage or visual deformity to the pavement shall be remedied as noted above. 314-4.3.5 Application. - Amend the first sentence in paragraph 8 as follows:
“Glass beads shall be applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
314-6 GREEN BIKE LANE. Green bike lanes shall be installed per plan and conform to the technical specifications included within the contract documents and shall be Streetbond CL or approved equal.

SECTION 307 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS 307-1 GENERAL. - Amend the following:

Add the following paragraphs:

Any person performing electrical work subject to the certification requirements of Labor Code sections 3099 et seq. shall be certified, as required by law, prior to, and throughout, the performance of such work.

Add the following paragraphs:

Inspection shall be required at the following stages: (1) prior to pouring foundation concrete, excavation dimensions shall be verified; (2) prior to placement of a standard, foundation and anchor bolts shall be verified; and (3) prior to pouring the cap, connections, ground bond and luminary shall be verified.

GC 64
There shall be no structure(s) encased in foundation concrete. Foundation concrete shall be held 4 inches to 5 inches (102 mm to 127 mm) below top of curb grade.

Anchor bolts shall be held by a template with the top of each bolt a maximum 1/2 inch (13 mm) below top of curb or a maximum ½ inch (13 mm) below top of sidewalk if set behind sidewalk.

The top of foundation concrete shall be cleaned of all foreign objects before foundation cap is poured. Standard shall be plumb and tightened prior to foundation cap placement.

Foundation cap shall be formed to a minimum dimension of 32 inches (813 mm) wide, centered to the light standard and from the back of curb to a point 9 inches (229 mm) beyond the back of the light standard. The cap slope shall be equivalent to adjacent sidewalk or shall be 2 percent from the top of curb in parkway. Cap shall be poured to encase anchor bolts and flow under street light standard so that the pole butt is encased. 307-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS.
307-8.2 Foundations. - Amend the following:

Amend the first sentence of paragraph 2 as follows:
“Foundations shall cure for 72 hours before erecting standards and 72 hours before erecting mast arms.”
Amend the second sentence of paragraph 2 as follows:
“Pile foundations shall cure for 72 hours before erecting standards and 7 days before erecting mast arms.”
Add the following paragraphs:

Minimum foundation dimensions shall be 32 inches x 32 inches x 46 inches (813 mm x 813 mm x 1,168 mm) or when bored with an auger shall be 32 inches x 60 inches (813 mm x 1,524 mm).

Foundation and cap concrete shall be as specified in Section 201-1. Cap concrete shall have a light broom finish.

There shall be an 8 foot x 5/8 inch (2.4 m x 16 mm) copper-clad ground rod placed in the center of the base and extended 3 inches (76 mm) above curb level with a ground clamp installed at the top.
307-8.3 Foundation Caps. - Amend the first sentence of paragraph 1 as follows:
“Foundation caps shall be the same color, finish, and material as the adjacent sidewalk, and be a minimum thickness of 4 inches (102mm) thick or unless otherwise specified in the Special Provisions.”
307-8.4 Concrete Slabs. - Amend the first sentence of paragraph 1 as follows:

GC 65
“Wherever the edge of a concrete foundation extends within 18 inches (450mm) of any existing concrete improvement, a concrete slab with a minimum thickness of 4 inches (102mm) or as specified in the Special Provisions shall be extended to meet the existing improvement.” 307-10 STANDARDS, PEDESTALS AND MAST ARMS. - Add the following paragraphs:

Standard shall be set square with the street or as directed by the Engineer. Standard shall be centered 30 inches (762 mm) behind curb face or as shown on the plan.

The access door at the base of the standard shall be a minimum ½ inch (13 mm) to a maximum 2 inches (51 mm) above the top of adjacent curb or sidewalk.

Anchor bolts shall have no threads exposed above top of nut when final tightening is completed.
307-11 PULL BOXES. - Amend the following:

Amend (b) of paragraph 3 as follows:
“150 feet for street lighting systems, and”
Add the following sentence to paragraph 4:

Conduit entering a pull box shall extend a minimum 3 inches (76 mm) above the rock base.

Add the following paragraph:

Single depth pull boxes shall be grouted on the inside, as specified. Pull boxes shall be located as shown on the plans and installed at either sidewalk or curb grade. 307-12 CONDUIT. - Amend the following:

Amend the first sentence of paragraph 6 as follows:
“Detector, telephone interconnect, or street lighting conduit shall be 1-1/4 inch (32 mm) nominal size unless otherwise specified in the Special Provisions.” Delete the second sentence of paragraph 6 and replace with the following:
“Direct interconnect and utility service conduit shall be 2 inch (51 mm) nominal size unless otherwise specified or required by agency or utility.”
Add the following sentence to paragraph 6:

Traffic Signal conduit size shall be as specified in Section 209-2.3.

Amend the second sentence of paragraph 2 as follows:
“Conduit placed behind a curb shall not be less than 18 inches (457 mm) nor more than 36 inches (900mm) below the top of the curb.”
Add the following sentence to paragraph 9:

There shall be no more than 2 conduits in each foundation.

Amend the first sentence of paragraph 7 as follows:
“not be less than 3 inches (76 mm) above the bottom of the box.” Add the following paragraph:

Where called for, Contractor shall be required to install traffic signal interconnect conduit, with pull rope, between new traffic signal controller and any existing traffic signal controller located within 1,500 feet (457 m).

GC 66
307-13 WIRES, CONDUCTORS AND CABLES.
307-13.1 General. - Add the following paragraph:

All conductors shall be new and in their original packaging. 307-14 SERVICES.
307-14.1 General. - Add the following paragraph:

When a service pedestal is installed in an unpaved area, a slab shall be constructed per Section 307-4.11.
307-17 TRAFFIC SIGNAL CONSTRUCTION.
307-17.2.2 Controller Cabinet Wiring Diagrams. - Amend the following:

Add the following sentence to paragraph 1:

Traffic signal Phase 4 shall face north, for southbound traffic.

Add the following paragraphs:

A representative from the traffic controller manufacturer shall be onsite at the time of signal activation and shall install timing and coordination provided by the Engineer.

All software and current upgrades, at the time of installation, for the controller and conflict monitor shall be provided to the City.
307-17.3 Pull Box Covers. - Amend the following:

Amend the first sentence as follows:
“Pull box covers to be installed in traffic signal systems or combined traffic signal and multiple circuit street lighting systems conforming to 209-4.2.3, shall conform to 209-3.7 and shall be inscribed “TRAFFIC SIGNAL”.”
Add the following sentence to paragraph 1:

Lid shall have two 1 inch (10 mm) brass bolts for fastening. 307-17.5.1 General. - Add the following paragraph:

Tape color codes for traffic signal phases shall be as follows: 0 - black; 1 - brown; 2 - red; 3 - orange; 4 - yellow; 5 - green; 6 - blue; 7 - violet; 8 - gray; 9 - white.

All cables shall be phase taped to match signal phasing. Cable splicing shall not be allowed in pull boxes.
307-17.6.1 General. - Amend the following:

Delete the first two sentences of paragraph 2 and replace with the following:

All signal and arrow indications shall be 12 inches (305 mm).

Add the following paragraph:

Traffic heads, pedestrian heads and shields shall be aluminum. Heads, hardware, etc. shall be flat black. Vehicle faces shall be 12 inches (305 mm). All red, yellow, green and “hand man” indicators shall be LED type. Pedestrian lenses shall be mechanically connected to the visor “egg crate.” Silicone glue shall not be allowed. Lamp sockets shall not be plastic and shall not GC 67
be held to the lens by use of a clip. The Contractor shall furnish per traffic signal installed, one of each color and type, spare vehicle and pedestrian LED’s to the City. 307-17.8.2 Pedestrian Push Buttons. - Add the following sentence:

Pedestrian push buttons shall be de-isolated with no cabinet logic ground leaving the controller cabinet.
307-17.10 Controller Foundation. Traffic signal controller foundations shall extend a minimum 18 inches (457 mm) and a maximum of 20 inches (508 mm) above finish grade, and be sized as necessary to fit the controller cabinet with a 1 inch (25 mm) lip, including the 1/2 inch (13 mm) chamfer, beyond outside cabinet dimensions. Cabinet shall be sealed on the concrete foundation with a silicon bead placed under the cabinet edge as it is set in place. 307-17.11 Reflectorized Street Name Sign Placement and Mounting. Top of sign frame shall have two free swinging mounting brackets manufactured from aluminum, bronze and stainless steel, as specified. 8 inch (203 mm) stainless steel bolts shall allow for fine adjustment. Dampening springs shall be used. Each swing bracket shall be adjusted vertically for leveling of the sign to fit mast arm angles. The bracket assembly shall permit the S.S.G. unit to swing perpendicular to the support hardware.

Hardware used to attach the sign and swing assembly to the mast arm shall by “Y-brackets,” “EZ- L brackets” or approved equal.

EZ-L brackets shall be a three piece telescoping design to adjust from 12 inches (305 mm) to 28 inches (711 mm) in 1 inch (25 mm) increments without additional adapters. The outside tube shall be 1-3/4 inches x 1-1/2 inches (44 mm x 38 mm) with a wall thickness of 5/32 inch (4 mm). The middle tube shall be 1-1/2 inches x 1-1/4 inches (38 mm x 32 mm) with wall thickness of 5/32 inch (4 mm) and one wall having a thickness of 3/8 inch (10 mm) and threaded for two 3/8 inch (10 mm) stainless steel holding bolts with external tooth lock washers. The inside tubes shall fit firmly within each other and slide smoothly. Safety tabs shall be located on the ends of each tube and will not allow the tubes to completely separate from each other during shipping and installation procedures. When installing EZ-L bracket, the middle tube should be extended first, then the inside tube.

The Y-bracket shall be one piece solid aluminum extrusion construction. There shall be four slots in the bracket to accommodate two 3/4 inch (19 mm) wide stainless steel straps side by side. Strapping shall have a minimum thickness of 0.020 inches (½ mm). The EZ-L bracket shall attach to the Y-bracket with a ½ inch (13 mm) stainless steel bolt, lock washer and ny-lock nut.

When installation of the S.S.G. sign to the mast arm is complete, the S.S.G. sign shall swing freely in both directions when moved by the installer without any binding or hindrance being felt, allowing the sign to move freely under normal weather conditions. 307-18 TESTING.
307-18.1 General. - Add the following paragraph:

Luminaires shall be in operation for 5 days prior to final acceptance.

GENERAL REQUIREMENTS

THIS PAGE INTENTIONALLY LEFT BLANK
COORDINATION OF WORK 01110-1
SECTION 01110 COORDINATION OF WORK

PART ONE -- GENERAL

1.1 SEQUENCING OF WORK
The Contractor shall submit the construction schedule in accordance with Section 01321 of the specifications and a Construction Sequencing Plan in accordance with item 1.2 of this Section.

The order of work shall proceed with the exceptions as follows:

The Contractor shall coordinate with the City’s current construction projects such as water, sewer, paving, and other utility improvements before scheduling any work. Work shall be sequenced in accordance with the approved Construction Sequencing Plan.

1. Paving and related work shall follow the timeline per Section 302-5.2 of the Specifications.

2. Citywide events calendar shall be considered with the construction schedule. Events calendar with specific dates will be provided during subsequent weekly construction meetings.

3. Construction around school zones shall be taken into consideration to avoid interference with the drop-off and pick-up times for each specific school. School calendar with school start/dismissal times are included in the Appendix.

1.2 CONSTRUCTION SEQUENCING PLAN
The Contractor shall prepare and submit a Construction Sequencing Plan (Plan) as a separate document for review and approval by the Engineer prior to the start of construction. The Plan shall describe, in detail, the proposed sequence of work and phasing of all construction activities necessary to complete the project.

The Plan shall, at a minimum, clearly identify and depict the proposed sequence and limits of each phase of the Project. The plan shall show the progression of work by phase and anticipated work limits. A minimum of one lane of traffic in each direction shall be maintained at all times, unless otherwise approved in writing by the Engineer. The Plan shall also demonstrate how access to adjacent properties, businesses, and emergency services will be maintained, and how the sequencing coordinates with existing and ongoing City projects and utility work. The Plan shall be consistent with, and work in conjunction with, the approved Traffic Control Plan.

The Plan shall also identify critical path activities, anticipated impacts to traffic and the public, and proposed measures to minimize disruptions. Work within school zones and along designated streets shall be sequenced in accordance with the restrictions specified in these Contract Documents.

The Contractor shall update the Construction Sequencing Plan as necessary throughout the duration of the project to reflect actual field conditions and revised sequencing.

COORDINATION OF WORK 01110-2

1.3 UTILITY COORDINATION
During construction, if City owned utility facilities are damaged, contractor shall inform the City. City crew will respond within two hours and assess the condition, and perform any necessary remedial work as quickly as possible. No additional compensation will be granted to the contractor for any delay due to the damage and repair of the utility facility.

Other utilities not owned by the City, contractor should notify and coordinate with the utility owner.

Contractor shall coordinate with Southern California Edison (SCE) planner, Matthew Middendorf at (909)-307-6874 for the traffic signal service installation prior to the start of the construction.

1.4 MAINTENANCE OF OPERATION OF EXISTING FACILITIES
Any shutdown will be coordinated with the Owner. All valves on the Owner’s existing facilities will be operated by the Owner. Written notice shall be given to the Owner’s Representative no less than 72-hours for residential areas and 12 days for commercial areas prior to the desired shut-off time. The Contractor shall be responsible for disposing of water drained from the existing pipelines.

1.5 COORDINATION SUBMITTALS

1. No water system shutdowns will be allowed on Monday or Friday, unless otherwise directed by City staff.

2. When approved, City will begin shutting down the water system to allow connection at 8:00 AM. Note the system drainage time may take up to two hours depending on location and field conditions.

END OF SECTION
TRAFFIC CONTROL PLAN 01111-1
SECTION 01111 TRAFFIC CONTROL PLAN
A. General
The intent of this specification is to provide the format and requirements in preparation of the Traffic Control Plan (TCP).

B. Format

1. The sheets of the TCP shall display, at a minimum, the title of the project, name of firm preparing the TCP, name and stamp of Registered Traffic or Civil Engineer preparing the TCP, approval block for City of Redlands approval, north arrow, title sheet with an index of the sheets, sheet number, and total number of sheets.

2. The TCP shall be drawn to a 1 inch = 40 scale, or as otherwise approved by City staff, on common size sheets ranging from 8-1/2 inches x 11 inches, 11 inches x 17 inches or 24 inches x 36 inches as determined appropriate based on work area.

3. TCP must be prepared and approved by a Registered Traffic or Civil Engineer in the State of California.

C. Requirements
The TCP shall contain the following items and scenarios of traffic control:

1. Traffic signal installation

2. Variations to accommodate night work;

3. All required detours;

4. Provide 4 changeable message boards, Solartech MB2-LR-1548 or approved equal, located throughout the project area to provide advance notification as work progresses;

5. The TCP shall be completed in conformance with Section 7-10.2.2.1 of the General Conditions and adhere to the following:
a. At least one lane of traffic shall be open on all roadways with appropriate traffic control and flaggers;
b. On street parking, where currently available, shall be open to the public outside of working hours; and
c. Shall be completed in conformance with all additional requirements from permitting agencies, such as Caltrans and SANBAG.

END OF SECTION
DESCRIPTION OF WORK 01112-1
SECTION 01112 DESCRIPTION OF WORK

PART ONE -- GENERAL

1.1 SUMMARY
The work to be done under this Contract includes the furnishing of project management, labor, materials, tools, and equipment for the construction of the California Street and Redlands Boulevard Intersection Widening Project for the City of Redlands, all in accordance with the Contract Documents.

A. The following contract drawings are made a part of these Contract Documents:

Title Sheet No.

Title Sheet & Index Map 1
Demolition Plan 2
California Street Improvements 3
Redlands Blvd. Improvements 4
Mission Zanja Channel Improvements – Sta. 11+13.00 to 5 Sta. 14+00.00
Mission Zanja Channel Improvements – Sta. 14+00.00 to 6 Sta. 17+13.72
Signing and Striping Plan 7
California Street Cross Sections 8-9
Channel Improvement Structural Plan 10-13
Signal Modification Plan 14
Water Improvement Plan 15-16
Non-Potable Water Improvement Plan 17
Revised Sewer As-Built F905-1 18

1.2 GENERAL SCOPE OF WORK
A. Work In This Contract: Work in this Contract includes all labor, materials, and equipment necessary for construction of the California Street and Redlands Boulevard Intersection Widening Project as noted on the Contract Drawings and all other Contract Documents and is summarized as follows:

1. The Work shall consist of widening and improving the intersection of California Street and Redlands Boulevard. Improvements include roadway widening/reconstruction, asphalt paving, curb and gutter, sidewalk, curb ramps, driveways, and all necessary pavement striping and signage. The Work also includes protecting in place or removing and replacing existing utilities, trees, and DESCRIPTION OF WORK 01112-2
public and private improvements; replacing destroyed survey monuments; disposing of excess material; and restoring all areas to pre-construction condition.

2. The Work shall include construction within the Mission Zanja Channel, including the removal of the existing transition structure and the extension of the existing reinforced concrete triple box culvert. Work shall include excavation, foundation preparation, installation of precast or cast-in-place structural components as shown on the plans, backfilling, compaction, installation of channel improvements, and all associated appurtenances, in accordance with the Contract Documents and applicable standards, including County of San Bernardino Flood Control District and Standard Plans for Public Works Construction.

3. The Work shall include furnishing and installing water, sewer, and non-potable water improvements, including pipe, fittings, valves, and appurtenances; utility potholing and verification; trenching, shoring, bedding, and backfilling; and restoring all disturbed areas.

4. The Work shall include traffic signal modifications, including furnishing and installing conduit, pull boxes, poles, mast arms, signal heads, detection systems, and all associated electrical work necessary to provide a complete and operational traffic signal system.

5. The Work shall include all traffic control, including furnishing and installing all necessary signs, barricades, delineators, arrow boards, striping, and flaggers required to maintain traffic flow and ensure public safety throughout the duration of construction.

6. The Work shall include all earthwork, including excavation, grading, compaction, import/export of materials, and disposal of excess soil and debris, as required to complete the project.

7. The Contractor shall, upon completion of the Work, test and place into operation all installed systems and appurtenances, and shall make all necessary adjustments, corrections, repairs, or replacements required to provide the City with a complete and fully functional project.

END OF SECTION
MEASUREMENT AND PAYMENT 01200-1
SECTION 01200 MEASUREMENT AND PAYMENT
A. Work Listed in the Schedule of Work Items

1. The application for payment will be for a specific item based on the percentage completed or quantity installed. The percentage complete will be based on the value of the partially completed work relative to the value of the item when entirely completed and ready for service.

2. A retention of five percent (5%) of the value of work completed will be withheld from progress payments. This retention amount will remain constant throughout the contract period, and will not be payable until the expiration of thirty-five (35) days after the recordation of the Notice of Completion.

B. Work Not Listed in the Schedule of Work Items
The General Conditions and items in the Special Provisions, general requirements, and specifications which are not listed in the schedule of work items of the bid form are, in general, applicable to more than one listed work item, and no separate work item is provided therefore. Include the cost of work not listed but necessary to complete the project designated in the contract documents in the various listed work items of the bid form.

The bids for the work are intended to establish a total cost for the work in its entirety.

Should the Contractor feel that the cost for the work has not been established by specific items in the bid form, include the cost for that work in some related bid item so that the proposal for the project reflects the total cost for completing the work in its entirety.

The Contractor may experience difficulty in excavation due to rock or unsuitable backfill material throughout the project locations. It shall be the Contractor’s responsibility to identify these areas and account for difficulty in excavation, the need to export rock or unsuitable backfill material and the need to import suitable backfill material. There will not be additional contract time or additional compensation for any project locations where any of these circumstances occur.

C. Bid Items

1. Mobilization, Bid Item 1:

Payment for Mobilization shall be made at the contract price per lump sum (LS) and shall constitute full compensation for all labor, material, equipment, and incidentals required MEASUREMENT AND PAYMENT 01200-2
within Section 01721. The bid price shall include, but not limited to, preliminary construction schedule, bonds, insurance, installation and relocation of information signs, installation and implementation of traffic control items per Section 01111, shop drawings, catalog submittals, and shall constitute full compensation for all labor, material, equipment and incidentals required. The bid price for mobilization shall not exceed 5 percent of the Bid Schedule total price.

2. Clearing, Grubbing and Removals, Bid Item 2:

Payment for Clearing, Grubbing And Removals shall be made at the contract price per lump sum (LS) as specified on the bid schedule and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work necessary as specified in the Contract Documents and Specifications, Standard Drawings, supplemental details, these Special Provisions, and as directed by the Engineer or his appointed designee, and no additional compensation will be allowed therefor.

3. SWPPP, Bid Item 3:

Payment for Storm Water Pollution Prevention Plan (SWPPP) shall be made at the contract lump sum price and shall constitute full compensation for preparation, approval, NPDES Permit and shall include all labor and incidentals noted within Section 01571.

Payment for the SWPPP shall be made based on the percentage of project completion to ensure compliance with all requirements. The completeness shall be determined by the Engineer and updated on progress payments.

4. Survey, Bid Item 4:

Payment for Survey shall be made at the contract lump sum price and shall constitute full compensation for research, construction surveying, construction staking, preparation and submittal of surveying cut sheets, tying existing control monuments that may be damaged or disturbed prior to construction, verifications of horizontal and vertical position of existing control monuments, recovery and reestablishment of damaged or disturbed control monuments after construction, preparation and submittal of corner records to applicable government agencies, provide recorded copies to the City and shall include all labor and incidentals noted within Section 01722.

Prior to construction, contractor shall provide corner records, survey monuments and any other existing survey control markers to the City for review. City Engineer/Surveyor will spot check the locations provided by the contractor’s surveyor. In any case, City shall back charge contractor for any missing survey markers or monuments.

Payment for the Survey shall be made based on the percentage of project completion to ensure compliance with all requirements throughout the duration of the contract. The completeness shall be determined by the Engineer and updated on progress payments.

MEASUREMENT AND PAYMENT 01200-3

5. Traffic Control, Bid Item 5:

Payment for Traffic Control Plan shall be made at the contract lump sum price and shall constitute full compensation for preparation, approval, and shall include all labor and incidentals noted to complete the Traffic Control Plan per Section 01111.

The installation and implementation of traffic control items shall be included throughout bid items and the specific traffic control required for installing each item.

6. Construction Phasing Plan, Bid Item 6:

Payment for Construction Phasing Plan shall be made at the contract lump sum (LS) price and shall constitute full compensation for preparation, submittal, review, revisions, coordination, and implementation of the Construction Phasing Plan, including all labor, materials, equipment, and incidentals required by the Contract Documents.

The Construction Phasing Plan shall include, but not be limited to, sequencing of work activities, maintenance of access to adjacent properties and businesses, identification of critical path operations, and integration with the approved Traffic Control Plan. The plan shall be developed such that a minimum of one lane of traffic in each direction is maintained at all times, unless otherwise approved in writing by the Engineer.

Payment shall be made based on the percentage of work completed, as determined by the Engineer, and shall reflect continued compliance with the approved phasing plan throughout the duration of the Contract.

7. 8” Curb and Gutter (SPPWC STD 120-2), Bid Item 7:

Item includes but is not limited to the construction of curb and/or curb and gutter. Curb shall be constructed per APWA Standard Plan 120-2 Curb and Gutter - Barrier and shall join to existing. The height and width of the curb and gutter shall match the existing. Item also includes all necessary dust control, clearing, grubbing, and removals such as removals of vegetation, rubbish, and utilities as required for the construction of the proposed improvements under this bid item. Bid Item shall also include traffic control and mobilization. Approximate locations for curb and gutter replacement are shown on the plans. The actual locations shall be verified during construction.

Payment for this item shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required.

8. 4” Thick PCC Sidewalk (SPPWC STD 101-2 and 112-2), Bid Item 8:

Item includes, but is not limited to, the removal and replacement of 4” thick PCC (560-C3250) sidewalk. The top 4” of subgrade shall be compacted to 95% relative compaction, in accordance with the project plans and specifications.

MEASUREMENT AND PAYMENT 01200-4
Item includes, but is not limited to, erosion control, sawcutting, removal of sidewalk of varying thickness, earthwork, and compaction as required for the construction of new 4” thick concrete sidewalk. The new sidewalk shall match the existing width and appearance of adjacent areas, including score lines and surface finish. Work also includes all necessary dust control, clearing, grubbing, grading, irrigation repair, informational signs, survey monument preservation, and removal of vegetation, rubbish, and utilities required for the proposed improvements under this item.

9. 6” Curb (City of Loma Linda Std. R-2.3), Bid Item 9:

Payment for the installation of 6” Curb shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment and incidentals required for the installation in accordance with City of Loma Linda Std. R2.3.

10. Pedestrian Ramp (Modified SPPWC Std. 111-5 Case A, Type 1), Bid Item 10:

Item includes but is not limited to earthwork, curb cuts and removals as required for the construction of new ADA access ramps with curb and gutter only. Existing sidewalk shall be removed and replaced as necessary to bring surrounding walkways into ADA compliance as well. Ramps shall include cast-in-place truncated domes. All access curb ramps shall be re-constructed in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. Item also includes all necessary dust control, clearing, grubbing, grading, irrigation repair, information signs, survey monument preservation, and removals such as removals of vegetation, rubbish, and utilities as required for the construction of the proposed improvements under this bid item.

Payment for the installation of Pedestrian Ramp shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment and incidentals required for the installation in accordance with Modified SPPWC Std. 111-5 Case A, Type 1.

11. Pedestrian Ramp (Detail D on Street Improvement Plan, Sheet 4), Bid Item 11:

Item includes but is not limited to earthwork, curb cuts and removals as required for the construction of new ADA access ramps with curb and gutter only. Existing sidewalk shall be removed and replaced as necessary to bring surrounding walkways into ADA compliance as well. Ramps shall include cast-in-place truncated domes. All access curb ramps shall be re-constructed in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. Item also includes all necessary dust control, clearing, grubbing, grading, irrigation repair, information signs, survey monument preservation, and removals such as removals of vegetation, rubbish, and utilities as required for the construction of the proposed improvements under this bid item.

MEASUREMENT AND PAYMENT 01200-5
Payment for the installation of Pedestrian Ramp shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment and incidentals required for the installation in accordance with Detail D on Street Improvement Plan, Sheet 4.

12. Junction Structure (SPPWC STD 331-3), Bid Item 12:

Payment for the installation of Junction Structure shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment and incidentals required for the installation in accordance with SPPWC STD 331-3.

13. AC Pavement, Bid Item 13:

Payment for AC Pavement shall be made at the contract price per ton (TON) and shall constitute full compensation for all labor, material, equipment and incidentals required for the installation of Asphalt Concrete pavement.

14. Sawcut AC Pavement, Bid Item 14:

Payment for Sawcut AC Pavement shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment and incidentals required for sawcutting Asphalt Concrete pavement.

15. 4’ Wide Curb Inlet Catch Basin (SPPWC STD 300-3), Bid Item 15:

Payment for the installation of 4’ Wide Curb Inlet Catch Basin shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with SPPWC STD 300-3.

16. 6” Thick Commercial Driveway (SPPWC STD 110-2), Bid Item 16:

Payment for the installation of 6” Thick Commercial Driveway shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with SPPWC STD 110-2.

17. Local Depression (SPPWC STD 313-3, Case B), Bid Item 17:

Payment for the installation of Local Depression shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with SPPWC STD 313-3, Case B.

18. Install 18” RCP Storm Drain, Bid Item 18:

Payment for 18” RCP Storm Drain shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required. No MEASUREMENT AND PAYMENT 01200-6
partial payment will be released. All must be complete and operable before any compensation will be released.

The price shall include, but not be limited to all necessary trench protection (shoring, bracing, sloping, etc.), pavement saw cutting and removal, trenching, disposal of excavated native soil, clearing and disposal of shrubbery or vegetation, bedding and backfilling, placing and compacting crushed aggregate base layer to required compaction, warning tape, compacting, assisting with compaction testing, placing and removing temporary asphalt concrete, installation of base and finish paving per trench repair detail on the plan, protecting in place or removing and replacing all existing utilities and public and private improvements, restoring all areas to pre-existing conditions.

19. Adjust Electric Vault to Grade, Bid Item 19:

Payment for adjusting Electric Vault to Grade shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the adjustment.

20. Precast Triple RCB with cutoff walls, Bid Item 20:

Payment for the Precast Triple Reinforced Concrete Box Culvert with Cutoff Walls shall be made at the contract unit price bid per linear foot, which price shall include full compensation for furnishing and installing the culvert system complete in place, including but not limited to excavation, shoring, dewatering, bedding, subgrade preparation, precast reinforced concrete box culvert sections, joints, gaskets, joint sealant, connection hardware, backfill, compaction, protection of existing utilities and improvements, preparation and submission of required submittals, and all labor, materials, equipment, tools, and incidentals necessary to complete the work.

Appendix G – Example Submittal for Existing Reinforced Concrete Box Culvert is provided for reference only. The Contractor may furnish the same reinforced concrete box culvert system shown in Appendix G, or an approved equal, subject to review and approval by the Engineer.

21. Transition Structure (Details on Sheets 10-13), Bid Item 21:

Payment for the installation of Transition Structure shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with details on sheets 10-13.

22. Guard Rail (Caltrans STD A77L1), Bid Item 22:

Payment for the installation of Guard Rail shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A77L1.

MEASUREMENT AND PAYMENT 01200-7

23. Traffic Signal Modification, Bid Item 23:

Payment for Traffic Signal Modification shall be made at the contract price per lump sum (LS) and shall constitute full compensation for all labor, materials, equipment, and incidentals required to complete the work as specified in the Contract Documents.

The work shall include, but not be limited to, modification of existing signal equipment, wiring, conduits, pull boxes, detection systems, signal heads, and controller components, coordination with the appropriate agencies, testing, and placing the system into proper operation.

24. Install 12” white reflective thermoplastic crosswalk (Caltrans STD A24E), Bid Item 24:

Payment for installing 12” white reflective thermoplastic crosswalk shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A24E.

25. Install 12” yellow reflective thermoplastic crosswalk (Caltrans STD A24E), Bid Item 25:

Payment for installing 12” yellow reflective thermoplastic crosswalk shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A24E.

26. Install 4” white reflective thermoplastic edge line (Caltrans STD A20B Detail 27B), Bid Item 26:

Payment for installing 4” white reflective thermoplastic edge line shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A20B Detail 27B.

27. Install Reflective Thermoplastic Pavement Marking (Caltrans STD A24A), Bid Item 27:

Payment for installing Reflective Thermoplastic Pavement Marking shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A24A.

MEASUREMENT AND PAYMENT 01200-8

28. Install 4” Solid white reflective thermoplastic line (Caltrans STD A20B), Bid Item 28:

Payment for installing 4” Solid white reflective thermoplastic line shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with Caltrans STD A20B.

29. 12”x12”x12” Cut in tee, Bid Item 39:

Payment for the installation of 12”x12”x12” Cut in tee shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

30. Install 8” and 12” AWWA C-151 DIP (Class 350) Water Main and Appurtenances, Bid Item 30 & 31:

Payment for 8” and 12” AWWA C-151 DIP (Class 350) Water Main and Appurtenances shall be made at the lineal foot price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install water pipeline complete in place per the plans and specifications.

The price shall include, but not be limited to all necessary trench protection (shoring, bracing, sloping, etc.), pressure testing and disinfection of the new pipelines, traffic control, pavement saw cutting and removal, trenching, disposal of excavated native soil, clearing and disposal of shrubbery or vegetation, bedding and backfilling, placing and compacting crushed aggregate base layer to required compaction, warning tape, compacting, assisting with compaction testing, restrained joints, fittings & bends that are not included in the other bid items, potholing, thrust blocks, placing and removing temporary asphalt concrete, flushing the pipeline, installing and removing the test plates, chlorinating the pipelines, re-chlorinating if necessary, installation of base and finish paving per trench repair detail on the plan, protecting in place or removing and replacing all existing utilities and public and private improvements, daily sweeping and cleaning work site, abandoning existing water main and valves as noted on the plans, installation and relocation of information signs, restoring all areas to pre-existing conditions.

Measurement shall be made horizontally along the centerline of the newly completed water pipeline, without deducting for pipeline fittings or appurtenances such as valves, tees, crosses, bends, side outlets, top outlets, etc.

31. 12” SDR 35 PVC Pipe Sewer Main, Bid Item 32:

Payment for installing 12” SDR 35 PVC Pipe shall be made at the contract unit price per linear foot and shall constitute full compensation for all labor, material, equipment and MEASUREMENT AND PAYMENT 01200-9
incidentals required to furnish and install the pipeline complete in place per the plans and specifications.

The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, cutting of lateral pipes, handling and disposal of unsuitable and waste material, pipe and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any damaged concrete gutters from expansion joint to expansion joint, including dowels at each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, work site, and restoring all areas to pre-existing conditions.

Measurement shall be made horizontally along the centerline of the newly completed PVC pipeline, without deducting for pipeline fittings or appurtenances.

32. Relocate Sewer Manhole, Bid Item 33:

Payment for relocating Sewer Manhole shall be made at the contract price per each (EA) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the relocation.

33. 6” P.C.C. Decorative Pavement, Bid Item 34:

Payment for installing 6” P.C.C. Decorative Pavement shall be made at the contract price per square foot (SF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

34. Grind AC Pavement, Bid Item 35:

Payment for Grind AC Pavement shall be made at the contract price per square foot (SF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the overlay.

35. AC Overlay, Bid Item 36:

Payment for AC Overlay shall be made at the contract price per square foot (SF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the overlay.

MEASUREMENT AND PAYMENT 01200-10

36. 6’ Chain Link Fence Type CL-6, Bid Item 37:

Payment for installing 6’ Chain Link Fence Type CL-6 shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

37. 4” Decomposed Granite, Bid Item 38:

Payment for installing 4” Decomposed Granite shall be made at the contract price per square foot (SF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

38. Pipe Gate (SBCFCD S.P. 209), Bid Item 39:

Payment for installing Pipe Gate shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation in accordance with SBCFCD S.P. 209.

39. Rail and Wire Revetment with Anchor, Bid Item 40:

Payment for installing Rail and Wire Revetment with Anchor shall be made at the contract price per linear foot (LF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

40. 4” Thick PCC Apron & Cutoff Wall, Bid Item 41:

Payment for installing 4” Thick PCC Apron & Cutoff Wall shall be made at the contract price per square foot (SF) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

41. Install Parapet Wall & Pipe Support Brackets, Bid Item 42:

Payment for installing Parapet Wall & Pipe Support Brackets shall be made at the contract price per lump sum (LS) and shall constitute full compensation for all labor, material, equipment, and incidentals required for the installation.

42. Unforeseen work not covered within all other bid items, Bid Item 43:

Payment for the unforeseen work not covered within all other bid items shall be made at the contract price per lump sum (LS) and shall constitute full compensation for all labor, materials, equipment, and incidentals required. Unforeseen work must be approved by the City staff before doing any work and pay estimate shall be negotiated based on unit price already established with the bid proposal for this project. Any required work that is outside of the proposed bid unit cost, shall be performed based on the Time and Material (T&M) basis and T&M cost shall be negotiated and approved by the City staff prior to performing the work. Unforeseen work will be paid in each billing cycle with a percentage of the lump sum cost included in the bid. This item may not be spent entirely.

MEASUREMENT AND PAYMENT 01200-11

43. Demobilization, Bid Item 44:

Payment for Demobilization shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment, and incidentals required within Section 01740.

END OF SECTION
CHANGE ORDER REQUESTS 01251-1
SECTION 01251 CHANGE ORDER REQUESTS

1.1 GENERAL
A. All quotations for preliminary change orders for extras, changes, additions, or deletions to the Work as described in EXTRA WORK of the GENERAL CONDITIONS shall be submitted to the ENGINEER, in writing, on the Change Order Request (COR) Cover Sheet and the Change Order Cost Summary Form, both attached, and in conformance with the requirements of Section 01254 CHANGE ORDERS. The quotation shall be firm for a period of not less than sixty (60) calendar days from the date of receipt of the quotation by the ENGINEER. The CONTRACTOR shall submit its written cost quotation and Time Impact Analysis not later than fifteen (15) days after being requested to provide such quotation, unless the ENGINEER allows more time. Delays in submitting quotations beyond the fifteen (15) days set forth herein, which cause a delay in the issuance of a Change Order or a delay to the completion date of the project, shall not be cause for a claim or a time extension under the Contract.

B. The ENGINEER'S request for quotation on a preliminary change shall not be considered authorization to proceed with the changed work prior to the issuance of a final Lump Sum or Time & Material Change Order, unless directed otherwise, in writing, by the ENGINEER, nor shall such request constitute justification for a delay to the existing Work or a time extension under the Contract.

END OF SECTION
CHANGE ORDER REQUESTS 01251-2
CHANGE ORDER REQUESTS 01251-3
Change Order Cost Summary
Project Name :

Change Order Request No. :

Date :

Direct
Labor
Direct
Materials
Direct
Equipment
(1): Lump Sum Work by
$0.00 $0.00 $0.00

Prime Contractor
(2): "T&M" Work by
$0.00 $0.00 $0.00
Prime Contractor
(3): Subtotal - Direct Work
$0.00 $0.00 $0.00
(Prime Contractor)

(4): All Lump Sum Work by
$0.00 $0.00 $0.00
subcontractors (any tier)
(5): All "T&M" Work by
$0.00 $0.00 $0.00
subcontractors (any tier) Totals
(6): Subtotal - Direct Work
$0.00 $0.00 $0.00

$0.00
(all subcontractors)
Add each of the
(3)+(6)=(7): Total - Direct Costs
$0.00 $0.00 $0.00
three columns
$0.00
across and enter
to the right.
(8): Markup
(20%
of
direct
labor)
(15% of
direct mat'l)
(15% of
direct equip)
$0.00 $0.00 $0.00 $0.00

(9): Prime Contractor
Markup 10% of line (6) direct sub work up to $5,000

for subcontractors plus 5% of line (6) direct sub work over $5,000

(10): Bonds & Insurance 1% of line (7)
$0.00
all direct work

(11): Additional amount

permitted by Contract

(12): GRAND TOTAL Add sums of lines)
$0.00
(7), (8), (9), (10) and (11)
CHANGE ORDERS 01254-1
SECTION 01254 CHANGE ORDERS

PART ONE -- GENERAL

1.1 REQUIREMENTS
Payment to the Contractor, or credit to the City, for any change, addition, deletion or extra to the Work, or settlement of any Claim, covered by any Change Order, shall be determined by the methods set forth herein. The Engineer may change the Plans and Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed twenty-five percent (25%) of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and the City, which shall be executed by a Change Order.

Unless otherwise stipulated, “Unit Prices” include all costs necessary to furnish, install and complete the Work. The “Unit Prices” include all direct costs for labor, equipment and materials, all insurance and bond costs, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but is not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax.

A. Unit Prices
Unit prices stipulated in the Bid or itemized in the approved Schedule of Values shall be utilized, where they are applicable and determined reasonable by the Engineer. In the event that the Change Order results in a change in the original quantity of more than twenty-five percent (25%), either increase or decrease, then either the Engineer or the Contractor may request a review of the unit price to determine if a new unit price shall be mutually determined by negotiation. Any new unit price mutually determined under this Subsection shall only apply to the units in excess of one hundred twenty five percent (125%) of the original quantity for overruns. In case of underruns, the unit price stipulated in the Bid shall be applied to the first twenty-five percent (25%) of the actual quantity of work performed and the new mutually determined price shall be applied to the quantity between twenty-five percent (25%) and seventy-five percent (75%) of the original quantity.

CHANGE ORDERS 01254-2
Renegotiated unit prices or unit prices for new items added to the Contract by Change Order shall be determined in accordance with Subsections B through G.

Whether stipulated in the Bid, itemized in the approved Schedule of Values or renegotiated, the unit prices used for payment constitute the total adjustment with no further costs owed for overhead, impact, profit, delay or impact to unchanged portions of the Contract, or any other reason. The unit price shall be full and final compensation as described in Subsection D.

The cost proposals for renegotiated unit prices shall be presented in accordance with the provisions of Subsections B through G. Should any Bid Item be deleted in its entirety, the amount bid for that bid item shall be subtracted from the total Contract amount. The Contractor shall be paid only for the actual cost incurred prior to the notification of such deletion for that Bid Item.

B. Lump Sum
The Engineer and the Contractor may mutually determine a total sum for the Extra Work. The Contractor shall summarize the total cost and furnish a breakdown of the proposed lump sum costs satisfactory to the Engineer in accordance with Subsections B through G. Such lump sum costs shall be full and final compensation as described in Subsection D. The Contractor’s quotation shall conform to the requirements of Section 01251- Change Order Requests, and be submitted in the Change Order Cost Summary Form provided (see Attachment 01251-A1). The Change Order Cost Summary Form cannot be used to nullify or supercede any specification or contractual provision.

If the method or amount of payment cannot be agreed prior to performing the Extra Work, the Engineer may unilaterally issue a Change Order in the amount determined reasonable by the Engineer for the Extra Work and direct the Contractor to proceed immediately. The Engineer also has the option to issue a Change Order directing the Work be done on a Time and Materials basis with the Contractor providing all labor, equipment, and materials necessary to complete the Work in a satisfactory manner and within a reasonable period of time.

Estimates for lump sum quotations and accounting for Time and Materials work shall be limited to direct expenditures necessitated specifically by the subject Extra Work, and shall be segregated as follows:

1. Labor, up to and including working general foremen, who are directly assigned to the Extra Work. Employees identified as superintendents or non-working general foremen shall not be charged as labor on Extra Work.

The labor costs shall include actual documented payroll costs including wages, payroll taxes as established by law (i.e., FICA, Federal and State Unemployment Taxes), fringe benefits as established by negotiated labor agreements, and any insurance costs (such as Worker's Compensation and General Liability Insurance but shall not include Automobile Liability Insurance or any other insurance costs). A detailed breakdown of those CHANGE ORDERS 01254-3
subcomponents of labor costs, by all crafts shall be submitted to the Engineer, by the Contractor and all Subcontractors, for approval, as part of the documentation of labor costs, within ten (10) working days after issuance of the Notice to Proceed. No other subcomponents of labor costs shall be considered, unless approved in writing by the Engineer.

The labor cost is not allowed to be increased by using labor classifications with paygrades higher than necessary to accomplish the Work.

2. Materials: The cost of materials used in performing the Extra Work will be the cost, including sales tax and freight, to the purchaser, whether Contractor, Subcontractor or other forces, from the supplier thereof, except as follows:
a. Cash or trade discounts available to the purchaser shall be credited to the City notwithstanding the fact that such discounts may not have been taken by the Contractor.
b. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the Engineer. Supplier markup, except for actual costs incurred in the handling of such materials, will not be allowed.
c. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on contract items or the current wholesale price for such materials delivered to the Jobsite, whichever price is lower.
d. If, in the opinion of the Engineer, the cost of materials is excessive, or the Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for the quantity concerned, delivered to the Jobsite less cash or trade discount. The City reserves the right to furnish materials for the Work and no claim shall be made by the Contractor for costs and profit on such materials.
e. For the purposes of this Section, a "Supplier" is defined as any person or persons, firm or business, who supplies materials of construction and/or permanent equipment, but who does not perform any portion of the Work of the Contract on site, for the Contractor, except that labor or labor supervision which may be required by some manufacturers as part of their equipment installation for warranty or other purposes.

CHANGE ORDERS 01254-4

3. Equipment Costs, including ownership, lease or rental costs, as well as operating costs, for individual equipment units whose replacement value is in excess of $500. Transportation and set up costs shall be included, but only if the equipment is imported to the worksite solely to perform work on the Extra Work described in the Change Order and the Contractor can demonstrate that the changed work cannot or could not be performed economically with equipment already at the site. Equipment costs shall be determined in accordance with the requirements set forth in Subsection G.

4. Small tools, equipment, consumables and incidental costs: No separate payment will be made for the use of small tools or equipment with a replacement value of $500 or less. This applies to tools and equipment owned by the Contractor or its subcontractors of any tier. Also, no separate payment will be made for fuel, lubricants, tool or equipment repairs, tool or equipment maintenance, consumables, drinking water, sanitary facilities or other incidentals. These costs are already included as a part of Markup.

5. Subcontractor Costs, including their overhead and profit, provided that such costs are direct costs to the Contractor for performing the Extra Work as set forth in Subsections B through G.

C. Time and Materials Work
The costs of all Changed/Extra Work submitted under the Time and Materials (T&M) method shall be formulated in accordance with the provisions of Subsections B through I.

Unless otherwise stipulated on the Change Order, the “Not-to-Exceed” amount for all T&M Change Orders is $10000. The Contractor is responsible for tracking costs and for notifying the Engineer in writing when costs approach 50% and 75% of the “Not-to-Exceed” amount. In addition, if the Changed/Extra Work cannot be completed within the “Not-to-Exceed” limit, the Contractor shall notify the Engineer in writing, and in a timely manner, that the limit requires an increase.

The City will only reimburse eligible costs up to the “Not-to-Exceed” amount.

The Contractor shall notify the Inspector at the beginning of each day when Changed/Extra Work is being performed. The Contractor shall notify the Inspector of the Changed/Extra Work being performed and describe the personnel involved, whether by Contractor forces or by its subcontractors at any tier. Failure to notify the Inspector prior to the start of Changed/Extra Work serves as the Contractor’s waiver to claim for compensation on that day.

For each working day, the Contractor shall submit a “Daily Extra Work Report” (DEWR) to the Inspector. The “Daily Extra Work Report” shall summarize labor, CHANGE ORDERS 01254-5
equipment and materials supplied. The Inspector will only consider Forms that are properly completed as described below.

1. Separate forms must be used for labor and for equipment/materials.

2. Labor, equipment, material or expenditures that are not included on The DEWR are ineligible for payment. There will be no exceptions to this requirement. It is the responsibility of the Contractor to include any and all items of labor, equipment, or material for which it requests compensation for each day’s work completed.

3. Information required on the Labor form shall include name of personnel, personnel classification, and only the number of hours worked on Changed/Extra work for the day being reported. Since the overhead allowance already includes all necessary supervision, any hours for additional supervision or non-working foremen are ineligible for additional payment. The premium pay for a general foreman is eligible for payment only if the general foreman is a working foreman and a general foreman was required by a Union Labor Agreement or otherwise approved by the Inspector. The general foreman rate is eligible for payment only during the time that a general foreman was required for the Changed/Extra Work.

4. Information required on the Equipment/Material shall include Contractorowned equipment and/or tools, and rented equipment or tools for which compensation is requested. Information shall include the type of equipment, size of equipment, equipment identification number, appurtenances, and only the number of hours worked on the Changed/Extra work.

5. The only allowable materials are materials delivered to the job site and/or incorporated only into the Changed/Extra work. The allowable materials shall be listed on the T&M sheet for the day that they are delivered to the job site and/or incorporated into the Changed/Extra work.

6. Delivery ticket(s) and/or bill(s) of lading for rental equipment and/or tools delivered to the site and/or material incorporated into the work for the day being reported must be attached with the T&M sheet for that day. No payment will be allowed for materials and/or rented equipment unless receipt(s) or bill(s) of lading is attached. If the request for payment is not substantiated by original vendor/supplier invoices, acceptable copies of original invoices, or other documentation acceptable to the Inspector, the City may establish the cost of the item(s) at the lowest possible wholesale price or rental rate applicable while the work was being performed.

CHANGE ORDERS 01254-6

7. Failure to submit the required “Daily Extra Work Report of Time and Material Work” by the close of the next working day shall waive all rights for that day unless otherwise approved by the Inspector. Work that cannot be substantiated by a “Daily Report”, approved and signed by the Inspector, is ineligible for payment.

8. The Contractor is responsible for preparing the “Daily Extra Work Report” for work by its Subcontractors and submitting the Forms to the Inspector on time.

9. The Contractor must have each “Daily Extra Work Report” verified by the Inspector. After the “Daily Extra Work Report” is approved by the Inspector, both the Contractor and Inspector sign the report. The original “Daily Extra Work Report” is retained by the Inspector with a copy provided to the Contractor.

10. When the “Daily Extra Work Report” is signed by the Inspector and the Contractor, it is binding on the Contractor and its Subcontractors.

11. When agreed to by the Inspector, the Contractor may submit a supplemental “Daily Extra Work Report” for labor, materials, or equipment for which the Contractor requests compensation but failed to list on the original daily report.
a. These supplemental forms shall be marked “SUPPLEMENTAL”. b. Unless otherwise approved by the Inspector, the supplemental forms may only be submitted for approval up to two (2) working days following the date when the work was performed.

No payment will be allowed for labor, materials, or equipment included on T&M sheets not signed by the Contractor and the Inspector. Payment will not be allowed for labor, materials, or equipment included on T&M sheets signed by anyone other than the Inspector or the Inspector’s immediate supervisor.

D. General
It is the intent of the City to settle all Change Orders full and final at the time the Change Order is issued. Therefore, the following paragraph shall be made a part of all Change Orders, whether included or not on the actual change order:
“The compensation (time and cost) set forth in a Change Order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers, for the Work or change defined in the Change Order, including impact on unchanged work. By signing the Change Order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all CHANGE ORDERS 01254-7
Suppliers, that the stipulated compensation includes payment for all work contained in the Change Order, plus all payment for the interruption of schedules, extended field overhead costs, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of the Change Order indicates that the Change Order constitutes full mutual accord and satisfaction for the change, and that the time and/or cost under the Change Order constitutes the total equitable adjustment owed the Contractor, all Subcontractors, and all Suppliers as a result of the change. The Contractor, on behalf of himself, all subcontractors, and all Suppliers, agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim related to this Change Order.

No further claim or request for equitable adjustment of any type for any reasonably foreseeable cause shall arise out of or as a result of this Change Order or the impact of this Change Order on the remainder of the Work under this Contract.”
Costs which shall not be paid in Change Orders under this Contract include, but are not limited to, interest costs of any type; claim preparation or filing costs; legal expenses; the costs of preparing or reviewing proposed Change Orders or Change Order proposals; lost revenue; lost profits; lost income or earnings; rescheduling costs; costs of idled equipment when such equipment is not at the site or has not yet been employed on the Work; lost earnings or interest on unpaid retainage; claims consulting costs; and the costs of corporate officer or staff visiting the site; any compensation due to the fluctuation of foreign currency conversion or exchange rates; loss of other business; changes in taxes or increased tax rates of any kind or any costs identified as unallowable under the provisions of the Federal Acquisition Regulations.

Extensions of time shall be based solely upon the effect of delays to the Work as a whole. Extensions of time shall not be granted for delays to the Work, unless the Contractor can clearly demonstrate, through analysis of the current updated schedule, that the delay to the Work as a whole arose or will arise from causes other than normal weather, beyond the control and without fault or negligence of the Contractor, or any Subcontractor, at any tier, and that such delays did or will, in fact, delay the progress of the Work as a whole. The Contractor shall not be entitled to a time extension unless it submits a Time Impact Analysis which is a calculation of the extent of the delay to the end date of the Work and which shows that the Work has been or will be extended beyond the current Contract completion date. A Time Impact Analysis is a scheduling procedure which utilizes the networking techniques (fragnets) and a written analysis of the facts associated with the alleged delay to demonstrate the effect of the alleged delay on the critical path of the schedule. A "fragnet" is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing current updated schedule to demonstrate (mathematically and graphically) the influence of the alleged delay on the end date of the Work and shall be the sole method for incorporating delays and impacts into the schedule. The objective of a CHANGE ORDERS 01254-8
Time Impact Analysis is to pinpoint, isolate, and quantify all time impact associated with a specific issue and determine its time relationship to past or current delays. Time extensions shall not be allowed for delays to parts of the Work that are not on the critical path of the currently approved monthly updated project schedule. Time extensions shall not be granted, nor delay damages of any kind whatsoever paid to the Contractor, until all available float, slack, or contingency time on the project is used and the end date of the Work is moved beyond the current, adjusted Contract completion date.

The cost summary, cost breakdowns and requests for cost reimbursement submitted by the Contractor (for delay, disruption, hindrance and interference associated with the changes, additions, deletions or extras) shall be itemized in a manner that, with mathematical certainty and without reliance upon probabilities or inferences, segregates the direct, actual reimbursable costs associated with each individual, change, addition, deletion, extra and (on an event-by-event basis) each individual delay or disruption event. Such cost summaries, breakdowns or requests shall not be based, in whole or in part, upon any methodology (such as “total cost” or “modified total cost” methodologies) that purports to calculate the Contractor’s additional costs of performance of the extra, change, addition or deletion (including without limitation the additional costs of delay, disruption or other impact) based on the difference between Contractor’s total actual Project or line item costs (with or without fee) and its original bid estimate for the Project or any original bid estimate line item. In connection with the foregoing, Contractor represents and warrants that it has the ability to generate and maintain complete and accurate cost accounting records that will reflect (i) the actual costs incurred or saved for each individual item of Extra Work, change, addition, deletion (including without limitation any costs of associated delay, disruption, interference, hindrance and the cumulative impact of each extra, change, addition, deletion on other parts of the Work); and, (ii) on an event-by-event basis, the effect of each delay or disruption that forms the basis of each request for extension of time, regardless of their scope, number, complexity, cumulative effect, or time of issuance or occurrence.

Except as provided in Section 6-6 of the General Conditions, Contractor shall have no right to recovery of any compensation, costs, expenses or damages resulting from delay, disruption, interference, or hindrance in the performance of the Work (including without limitation interruption of schedules, excess or extraordinary extended field and indirect overhead costs, loss of productivity and the impact, ripple or cumulative effect on other Work).

Contractor waives any claim or rights and remedies based on abandonment, quantum merit, rescission or other similar legal theory by reason of any of the following circumstances, which the Contractor acknowledges and agrees are within the reasonable contemplation of the parties: (i) changes, additions, deletions and extras to the Work after execution of the Contract and issued from time to time throughout the period of construction, regardless of their scope, CHANGE ORDERS 01254-9
number, cumulative value, or complexity, to correct errors, omissions, conflicts, and ambiguities in the Contract Documents, or to implement discretionary changes to the scope of Work requested by the City; (ii) the issuance and performance of changes, additions, deletions and extras in a manner that is not in sequence with the as-built or as-planned progress of the Work; (iii) changes due to Differing Site Conditions; (iv) suspensions of the Work or parts thereof, or limitations on access to portions or all of the Work, for the convenience of City or in the interests of the Project; (v) delay or disruption to the Work due to failure of the City, Engineer or Inspector to timely perform any contractual obligation.

E. Markups – Overhead and Profit

1. In addition to the direct expenditures specified for labor, materials and equipment in Subsection B, a lump sum will be paid for all overhead and profit, including: All insurance costs other than specifically mentioned in this Section, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but are not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax. Such lump sum shall conform to the following schedule of percentages of the total amount of direct expenditures of the Contractor and subcontractors.
(a) Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:
1) Direct Labor 20%
2) Direct Materials 15%
3) Direct Equipment 15%
(b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in (a) shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

CHANGE ORDERS 01254-10

2. Bonds and Insurance
An additional allowance of one percent (1%) of all direct costs (less markup) is allowed.

3. Add/ Deduct Changes
The overhead rates determined above shall be applied to all additive Change Orders, except those utilizing as-bid Unit Prices listed in the Bid Proposal.

Any change in the Work involving both extras and credits shall show a net total cost, including subcontracts. Allowances for overhead and profit to the net total cost, as specified herein above, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was signed.

4. When all or any part of the extra work is performed by a Subcontractor, the markup established in subsection 1.1.E.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

F. City Furnished Materials, Equipment and Services
The Engineer reserves the right to furnish materials, equipment and services deemed expedient for use on the Changed/Extra Work. The Contractor shall have no claim for profit or overhead on the cost of such materials, equipment and services.

G. Equipment Costs
The rates for rental or leased equipment shall not exceed the rates listed in the Caltrans Labor Surcharge and Equipment Rental Rates (Caltrans LS&ERR). For T&M Change Orders, the rates are established by the actual paid invoice(s) that comply with the requirements of Subsections G.1 and G.3. Owned equipment costs shall not exceed the rates established by Subsection G.2. The most recent published edition in effect at the commencement of actual equipment use shall be used.

The rates paid for any rented or leased equipment or tools shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance and all incidental costs associated with the operation of the equipment or tools.

CHANGE ORDERS 01254-11
It is the responsibility of the Contractor to include any appurtenances added to equipment which would increase the basic rate for said equipment (i.e., hoe-ram, oversize bucket, and etcetera) as established in the acceptable rental rate guide.

All equipment and/ or tools shall be acceptable to the Inspector, in good working condition, suitable for the purpose for which it is to be used, and necessary to complete the Changed/Extra Work. Payment will be based on the manner in which the equipment was actually powered, operated and modified per the equipment manufacturer’s recommendations.

1. Rented or Leased Equipment
For equipment rented or leased (including lease with purchase option) in arm's length transactions from outside vendors, the Contractor shall be paid the actual invoiced, rented or leased rates provided that the invoiced lease or rental rates do not exceed the rates set forth in the Caltrans LS&ERR. Arm's length rental or lease transactions are those in which the firm involved in rental or lease of such equipment is not associated with, owned by, have common management, directorship, facilities, or stockholders with the firm renting the equipment. Submittal by a Contractor of a rental or leased invoice from the lessor will be prima facie proof of compliance with the above. However, such invoices are not conclusive proof; if questioned, the burden of proof remains with the Contractor. In no event shall the leased equipment rate billed to the City be at rates exceeding those prescribed in the following table:

Actual Usage (Change Order
& Contract Work Combined) Payment Category
Less than 8 hours Hourly Rate
8 or more hours but less than 7 days Daily Rate
7 or more days but less than 30 days Weekly Rate
30 calendar days or more Monthly Rate
a. When in Use:

Actual equipment use time documented by the Inspector shall be the basis that the equipment was utilized on the changed work and paid for under the Change Order. In addition to the lease or rental rate, equipment-operating costs shall not exceed the estimated hourly operating rate as set forth in the Caltrans LS&ERR. The hours of operation shall be based upon actual equipment usage on the changed work as recorded by the Inspector. For multiple shift work sequences, the allowable equipment rate shall not exceed fifty percent (50%) of the base rate, for second or third shifts. b. When Idle:

CHANGE ORDERS 01254-12
Idle equipment is equipment on site and necessary to perform the Work under the change but not in actual use due solely to the impact of the changed work. Equipment operating costs due to idle time, documented by the Inspector, shall be paid at the rate determined in “G” (1) above. Idle time shall include a reasonable time allowance to and from the project site.

Payment for equipment or tools shall be limited to hours actually worked on the Changed/Extra Work if the equipment or tool is already on site for Work under the original Contract. No “standby” time will be paid for equipment already on site for Work under the original Contract.

If equipment or tools are used intermittently and, when not in use, could be returned to the rental source at less expense than holding it at the work site, it shall be returned, unless the Contractor elects to keep it at the work site at no expense to the City.

2. Owned and Other Equipment
Equipment rates for owned equipment or equipment provided in other than arm's length transactions shall not exceed the total hourly costs as set forth in the Caltrans “Labor Surcharge and Equipment Rental Rates” effective at the time the work is performed. (The Caltrans equipment rental rates are available on the internet at
http://www.dot.ca.gov/hq/construc/equipmnt.html.) If the equipment is not listed in Caltrans LS&ERR, then the Rental Rate Blue Book shall be used. When using the Blue Book, the hourly rate for any period less than 7 days shall be the weekly rate divided by 40, plus the Operating Cost.

Except as noted herein below, this equipment hourly rate plus the estimated operating cost per hour from the Blue Book will be paid for each hour the equipment actually performs the Extra Work. Daily records listing the equipment units and their respective operators, identification code, and actual usage on the Work under the Change Order, as certified at the end of each work day (or work shift if the Work is being performed in multiple work shift sequence) by the Inspector shall be the record upon which actual equipment use shall be based. For multiple shift work sequences, the Caltrans overtime factor shall be applied (When using the Blue Book one-half the Non-Operating Cost will be deducted for second and third shifts. The Non-Operating Costs are the Blue Book monthly or weekly/40 rates, as applicable.). It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.
a. When Idle:

CHANGE ORDERS 01254-13
Payment for equipment necessary to be on the site to complete the Work, but not in actual use due solely to the impact of the changed work, shall be paid per the table in Caltrans Standard
Specifications Section 9-1.03A(3b), provided that its presence and necessity on the site has been documented by the Inspector, and further provided that the equipment was idled solely by actions of the City. Idle equipment time will only be paid as a function of delays specifically directed or caused by the City's actions. In no event shall the idle time claimed in a day for a particular piece of equipment exceed the normal work schedule established for the project - usually eight (8) hours per day or forty (40) hours per week, and excluding Saturdays, Sundays, and holidays. For multiple shift work sequence, the allowable idle equipment rate shall not be allowed, for second or third shifts. It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.

3. Equipment Haulage and Set Up Costs
Documented and actual equipment haulage and set up costs shall be paid for, if applicable as set forth in Subsection B.3.

4. Other Equipment Cost Guides
In the event that a piece of equipment used on a Change Order is not listed in Caltrans or the Blue Book, costs may be derived from the Associated General Contractor’s of America Equipment Ownership Guide, the Associated Equipment Dealers Guide, or the Equipment Rate Guide published by the U.S. Army Corps of Engineers as adjusted appropriately for the type of work and use and the regional area of the Work under this Contract.

H. Records
At any time should the Contractor deviate substantially from the schedule, method and sequence of operation, equipment, cost or pricing data furnished by the Contractor and agreed to by the City in connection with the Change Order or should the City determine that any price negotiated in connection with the Change Order is defective due to such deviation or the fault of the Contractor, the City reserves the right to reduce the Change Order cost and reissue the Change Order at the amount in which the City determines to be the actual costs to complete the change.

Whenever any material or process is indicated or specified by patent or a proprietary name, or by name of a manufacturer in the Change Order, such direction shall not relieve the Contractor’s responsibility or obligation to perform CHANGE ORDERS 01254-14
work in accordance with the contract requirements. The Contractor shall be solely responsible for, and have control over construction means, methods, techniques, sequences and procedures, coordination of all portions of the contract and Change Order work.

The Contractor shall on a weekly basis submit an approximate accounting of the amount expended on the Time and Materials work to date and an estimate of the Impact to the time of performance of work.

I. Partial Payments for Time and Materials Work.

Progress payments for Time and Materials work shall only be made if the anticipated cost of the changed work is in excess of $50,000 and/or the time to perform the changed work will exceed two (2) months duration. To receive payments for Time and Materials work, the Contractor shall submit to the Engineer an invoice of the daily reports which were verified by the Inspector, with details and documents, verifying the Contractor’s and Subcontractor's actual costs incurred for the Time and Materials work as set forth in Subsections B through H. Costs shall be submitted within thirty (30) calendar days after the T&M work has been satisfactorily completed unless an extension of time for submittal is authorized in writing by the Inspector.

END OF SECTION
SCHEDULE OF VALUES 01298-1

SECTION 01298 SCHEDULE OF VALUES

1.1 GENERAL
A. The Schedule of Values shall be used as a basis for determining progress payments on a lump sum contract or any designated lump sum bid item. The Schedule of Values shall be a schedule of cost loaded construction activities equal, in total, to the lump sum bid and shall be in such form and sufficient detail to correctly represent a reasonable apportionment of the lump sum. Prior to submitting an invoice for payment, the CONTRACTOR shall have submitted a detailed Schedule of Values and obtained approval from the ENGINEER.

B. Each lump sum bid item on the Schedule of Work and Prices, as set forth in the Bid must be broken down separately. The breakdown of each lump sum bid item must cover the cost of construction required by the contract documents for that item. The sum of the values for the construction activities, within a bid item, must equal the total bid amount for that item. The breakdown shall include subcontract amounts which shall not deviate from the amounts submitted in the Bid Proposal. The CONTRACTOR shall provide certification from the Subcontractors certifying the subcontract amounts.

C. Each activity in the Schedule of Values shall delineate one construction activity.

For example, the placement of concrete between construction joints, the construction of an electrical duct bank or pipeline between points A & B. The costing for each activity should include all costs for the labor and materials or equipment required to complete the activity. For example, concrete construction activities should include all costs for the forming, placing of reinforcement, placing concrete and curing. The cost for pipeline construction activities should include materials, equipment and installation including pipeline supports or thrust blocks. The excavation and backfill for a pipeline or structure may be separate activities. The Contract Price breakdown shall include the itemized costs for the plant establishment and any maintenance services to be performed before the final project acceptance is made. No non-construction activity shall be cost loaded.

D. The CONTRACTOR shall use cost loaded construction activities from the Construction Schedule as a Schedule of Values. Each construction activity shall be encoded to its bid item and a sort provided for each bid item totaling the cost loaded amount. The total of the Cost Loaded amounts for each bid item shall equal the amount bid for that item. The total of the Schedule of Values shall equal the current Contract value at all times. At any time during the progress of the Work of the Contract the INSPECTOR reserves the right to review the cost loading of the Schedules of Values and direct necessary revisions. When requested by the INSPECTOR, the CONTRACTOR shall provide all information necessary to substantiate the cost loading.

SCHEDULE OF VALUES 01298-2

E. Attached are samples of the Schedule of Values. The City will provide project specific Schedule of Values for the CONTRACTOR to use throughout the project at the Preconstruction Meeting. The Schedule of Values must be used by the CONTRATRACTOR at the time of each progress payment.

END OF SECTION
SCHEDULE OF VALUES 01298-3

SCHEDULE OF VALUES 01298-4

SCHEDULE OF VALUES 01298-5

CONSTRUCTION SCHEDULE 01321-1
SECTION 01321 CONSTRUCTION SCHEDULE

1. THE REQUIREMENT
A. It is expressly understood and agreed that the time of beginning, the rate of progress, and the time of completion of the Work are of the essence of this Contract.

B. The CONTRACTOR’S representative in charge of scheduling is required to attend all meetings pertaining to scheduling and progress of the Work.

C. The CONTRACTOR shall submit to the ENGINEER 3 hard copies and the electronic file of the CONTRACTOR'S Construction Schedule (the schedule) at the time of the preconstruction meeting. The schedule shall be either a Critical Path Method (CPM) Network or a detailed Bar Chart with the critical path clearly shown. If the CPM network option is used, then Primavera Project Management or Microsoft Project shall be the scheduling software. If a detail Bar Chart is used, Microsoft Excel shall be the software utilized. The schedule shall include the following:

1. Activity ID,

2. Activity Description,

3. Start date for each activity,

4. Finish date for each activity,

5. Original duration,

6. Predecessor,

7. Successor,

8. Percent Complete,

9. Remaining Days.

A minimum of seven (7) calendar days for review of each schedule. Schedule activities shall be of sufficient detail to assure adequate planning has been done for proper execution of the Work and such that, in the sole judgement of the ENGINEER, it provides an appropriate basis for monitoring progress. The schedule shall begin with the date of issuance of the Notice to Proceed and conclude with the date of Final Completion shown in the Contract. Submittal and approval of the schedule in accordance with the requirements of this Section is a condition precedent to the issuance of any payments under this Contract. Once the schedule is approved it will become the baseline schedule and must be shown and compared on all subsequent schedule submittals.

D. Float, slack time, or contingency within the schedule (i.e., the difference in time between the project's early completion date and the required Contract Completion date), and total float within the schedule, is not for the exclusive use of either the CITY or the CONTRACTOR, but is a jointly owned expiring resource available to and shared by both parties. Pursuant to this float sharing requirement, use of CONSTRUCTION SCHEDULE 01321-2
float suppression techniques shall be cause for rejection of the schedule and any revisions or updates.

E. Time extensions shall not be granted nor delay damages paid until a delay occurs which is beyond the control and without the fault or negligence of the CONTRACTOR and its Subcontractors or Suppliers, at any tier, and which extends actual performance of the Work beyond the current Contract completion date and the completion date projected by the current, approved, updated schedule. If the delay occurs along a path, which the current approved Construction Schedule update projects late completion prior to addition of any CITY caused delay, then the time extension allowed will be only for the additional delay demonstrated by the approved Time Impact Analysis. Time extensions shall be granted only if they are clearly demonstrated by the CONTRACTOR through the submittal, within seven (7) calendar days after the delay occurs, of a Time Impact Analysis which demonstrates the estimated impact on the end date of the Work; is based upon the updated Construction Schedule current as of the month the delay occurred; and demonstrates that the delay cannot be mitigated, offset, or eliminated through such actions as revising the intended sequence of Work or other means.

If a time extension if granted by the CITY, the updated schedule reflecting the change shall become the baseline and be reflected schedule and must be shown and compared on all subsequent schedule submittals.

Since float time within the Construction Schedule is jointly owned, it is acknowledged that CITY caused delays on the project may be offset by CITY caused time savings (e.g. critical path submittals returned in less time than allowed by the Contract or approval of substitution requests which result in a savings of time to the CONTRACTOR). In such an event, the CONTRACTOR shall not be entitled to receive a time extension or delay damages until all CITY caused time savings are exceeded and the Contract completion date is also exceeded.

F. If the initial schedule submitted shows completion of Work more than thirty (30) calendar days in advance of the Contract completion date, the ENGINEER may, at no cost to the CITY, decrease the Contract duration by issuance of a Change Order which changes appropriate Milestone Date(s) and the Contract completion date to the completion date reflected on the schedule. Any approved schedule, revision, or update having an early completion date shall show the time between the early completion date and the Contract completion date as "project float".

G. Comments made by the ENGINEER on the schedule during review will not relieve the CONTRACTOR from compliance with all requirements of the Contract. The ENGINEER may request that the CONTRACTOR and all major Subcontractors (defined herein as being any Subcontractor, Sub-Subcontractor, or Supplier with five (5) percent or more of the value of the Contract) participate in CONSTRUCTION SCHEDULE 01321-3
review of any schedule submission. All revisions shall be submitted within seven (7) calendar days after the ENGINEER’S review.

H. Two copies of an updated schedule shall be submitted to the ENGINEER for approval with the submittal of each CONTRACTOR'S monthly payment request or the monthly payment request will be withheld. For those activities started but not yet completed at the time of submittal, the updated schedule shall reflect the percentage complete, as agreed between the CONTRACTOR and the INSPECTOR, and an estimate of the remaining duration. The monthly update of the schedule shall include an updated bar chart with logic arrows or network diagram and include the same additional data as required by Section 1.C. If the CPM network option is used, the schedule shall be calculated using remaining durations and the progress override option. The monthly update shall also include a complete, hard copy list of all the changes made from the previously approved submittal. If the schedule is done using Primavera, use a Claim Digger report for the list of changes.

I. The submittal of an updated schedule which meets the requirements of this Section, accurately reflects the status of the Work (for all previously accepted activities), and incorporates all approved changes into the schedule, shall be a condition precedent to the processing of the monthly payment application. (Actual and/or forecast dates for status of additional submittal cycles shall be added without the prior approval of the Engineer.) Updated schedules shall also be submitted at such other times as the ENGINEER may direct. Upon approval of a Change Order or issuance of a notice to proceed with a change, the approved change shall be reflected in the next schedule update.

J. If completion of any part of the Work, delivery of equipment or materials, or submittal of CONTRACTOR submittals is behind schedule and will impact the end date of the Work, the CONTRACTOR shall submit a written recovery plan acceptable to the ENGINEER for completing the Work by the current Contract completion date, if requested by the ENGINEER.

K. As a condition precedent to the release of any retained funds, the CONTRACTOR shall, after substantial completion of the Work has been achieved, submit a certified, final schedule which accurately reflects the manner in which the project was constructed and includes actual start and completion dates for all activities on the schedule.

END OF SECTION
CONSTRUCTION PROGRESS PHOTOGRAPHY 01322-1
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY

1.1 GENERAL
A. Required: Provide photographs taken at the Jobsite at the specified stages of Contracted Work in accordance with provisions of this Section.

1. The Contractor shall provide the City with photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc).

2. Take first photographs just before CONTRACTOR starts any work operations at the Jobsite.

3. Take final photographs when all Contracted Work has been completed, regardless of time interval since previous photographs were taken.

1.2 SUBMITTALS
Except as otherwise directed by the ENGINEER, submit all photographs electronically on a CD/DVD organized by phase of construction and location.

1.3 QUALITY ASSURANCE
Photographs and prints to be of professional quality; clear, in focus, with high resolution and sharpness, and with minimum distortion.

END OF SECTION
CONSTRUCTION STATUS REPORTS 01323-1
SECTION 01323 CONSTRUCTION STATUS REPORTS

1.1 REQUIREMENTS
A. Daily Status Report
The Contractor shall complete a daily report indicating manpower, major equipment, subcontractors, unusual occurrences and etc., involved in the performance of the work. The daily report shall be completed on forms prepared by the Contractor and approved by the City and shall be submitted to the Project Manager at the conclusion of each work week.

The Contractor shall also have workers on the project sign in and out each day on the City of Redlands Daily Sign In Sheet which shall state the name, times in and out and the work performed by each worker on the project each day. The completed Daily Sign In Sheets shall be submitted to the City of Redlands Project Manager at the end of each work week. Failure to submit daily reports and daily sign in sheets to the Project Manager on a weekly basis will result in a possible and temporary suspension of work until reports are submitted.

B. Weekly Status Report
During the construction phase of the Work, the CONTRACTOR shall submit weekly written status reports to the ENGINEER and the INSPECTOR. The report shall contain a record of inspections and tests, not performed by CITY forces, for all Work accomplished subsequent to the previous report and shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

2. Inspections and tests, and location of inspections and tests that were made.

3. Results of inspections.

4. Reports of tests performed, including those specified, with the results of the tests, and acceptance criteria, including failures and remedial action to be taken. Test results, including all computations, shall be attached to the report form. Where test results cannot be completed by the time the report is submitted, a notation shall be made that the test was performed, including the approximate expected date that test results will be reported.

5. Report of any nonconforming items/activities. Nonconformance report forms designed solely for this purpose shall be utilized.

CONSTRUCTION STATUS REPORTS 01323-2

6. Results of inspections of material and equipment done upon their arrival at the Jobsite and prior to their incorporation into the Work. This includes, but is not limited to, compliance with approved submittals, damage, and proper storage requirements.

7. Offsite quality control activities.

8. Instructions received from the ENGINEER or INSPECTOR.

9. In all cases, the report must be verified and signed by the CONTRACTOR'S representative. The verification is to contain the statement that all supplies and materials incorporated in the Work are in compliance with the terms of the Contract except where noted.

C. 3 Week Look Ahead Schedule
During the construction phase of the Work, the CONTRACTOR shall submit 3 Week Look Ahead reports to the ENGINEER at the weekly progress meetings or as directed by the ENGINEER. The report shall include the following information:

1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).

D. Miscellaneous Submittals
CONTRACTOR shall prepare a Daily Construction Report recording the following information concerning events at the job-site and submit original copies to the ENGINEER at weekly intervals for approval:

1. List of Subcontractors and Sub-Subcontractors at the site, types of works and job location.

2. Count of CONTRACTOR’S personnel at the site, name, type of work, hours completed and job location.

3. Construction equipments at the site.

4. High and low temperatures, general weather conditions.

END OF SECTION
SUBMITTALS 01330-1
SECTION 01330 SUBMITTALS

1.1 THE REQUIREMENT
A. The CONTRACTOR shall furnish a schedule and list of all required submittals to the ENGINEER, including required submittals by all Subcontractors.

B. Wherever called for in these Specifications or on the plans, or where required by the ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, two (2) hard copies and one electronic (PDF) copy of each submittal.

The term "submittal" as used herein shall be understood to include detail design calculations, design drawings, shop drawings, fabrication and installation drawings, erection drawings, lists, graphs, operating instructions, catalog sheets, data sheets, samples, and similar items. Unless otherwise required, said submittals shall be submitted to the ENGINEER at a time sufficiently early to allow review of same by the ENGINEER and to accommodate the rate of Construction Progress required under the Contract without delaying the Contract Work and with due regard for the possibility of resubmittals. All submittals shall be in English.

C. All design or shop drawings or other submittals shall be accompanied by a transmittal form for each submittal. Any submittal not accompanied by such a form may be returned, at the ENGINEER'S discretion, for resubmittal.

D. Normally, a separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. Transmittal of a submittal of various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates a review of the group or package as a whole. A multiple-page submittal shall be collated into sets, and each set shall be stapled or bound, as appropriate, prior to transmittal to the ENGINEER.

E. Shop Drawings shall show in detail the size, sections, and dimensions of all the member(s); the arrangement and construction of all connections and joints; all holes, straps, and other fittings required for attaching work and other pertinent details. When required, engineering computations shall be submitted. The CONTRACTOR shall be responsible for delivering reviewed copies of shop Drawings to all others whose work is dependent thereon. The CONTRACTOR shall maintain at the site of the Project, at all times, a complete file of approved Shop Drawings and manufacturers' data for this Project.

F. Except as may otherwise be provided herein, the ENGINEER will return prints of each submittal to the CONTRACTOR, with its comments noted thereon, within twenty (20) calendar days following their receipt by the ENGINEER. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal SUBMITTALS 01330-2
item. The CITY reserves the right to withhold moneys due the CONTRACTOR to cover additional costs of the ENGINEER'S review beyond the second submittal. Submittal will be returned to the CONTRACTOR with one of four (4) markings:

1. If a submittal is returned to the Contractor marked "NO EXCEPTIONS," formal revision and resubmission of said submittal will not be required.

2. If a submittal is returned to the Contractor marked "EXCEPTIONS NOTED," formal revision and resubmission of said submittal will not be required, unless specifically requested.

3. If a submittal is returned to the Contractor marked "RETURNED FOR CORRECTION," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

4. If a submittal is returned to the Contractor marked "NOT ACCEPTABLE," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.

G. All Work for which Shop Drawings are required shall be performed in accordance with the reviewed and approved copies. Fabrication of an item shall not commence before the ENGINEER has reviewed the pertinent submittal and returned the copies to the CONTRACTOR marked either "NO EXCEPTIONS TAKEN," or "MAKE CORRECTIONS NOTED“. Revisions indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis for claims for extra work.

H. All CONTRACTOR submittals shall be carefully reviewed by an authorized representative of the CONTRACTOR prior to submission to the ENGINEER.

Each submittal shall be dated, signed, and certified by the CONTRACTOR as being correct and in strict conformance with the Contract Documents. No consideration for review by the ENGINEER of any CONTRACTOR’S submittal will be made for any items which have not been so certified by the CONTRACTOR. All noncertified submittals will be returned to the CONTRACTOR without action taken by the ENGINEER, and any delays caused thereby shall be the total responsibility of the CONTRACTOR.

I. Should the Shop Drawings or manufacturers data (for submittals required by the Standard Specifications or the specifications) show variations from the Contract requirements, the CONTRACTOR shall make specific mention of such variations in the letter of transmittal, in order that, if acceptable, suitable action may be taken for proper adjustment of the Contract; otherwise the SUBMITTALS 01330-3
CONTRACTOR will not be relieved of the responsibility for executing the work in accordance with the Contract Documents, and the approved submittals.

J. The ENGINEER’S review of CONTRACTOR’S submittal shall not relieve the CONTRACTOR of the entire responsibility for the correctness of details and dimensions and conformance to the Specifications. The CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in the submittal. Any fabrication or other work performed in advance of the receipt of accepted submittals shall be entirely at the CONTRACTOR’S risk and expense.

The CONTRACTOR shall be responsible for the dimensions and the design of adequate connections and details.

K. CONTRACTOR’S Coordination:

1. ENGINEER will return and will not review unrelated submittals.

2. The CONTRACTOR may be required to provide drawings, setting diagrams and similar information necessary for proper coordination of Contracted Work. Such data shall remain between the CONTRACTOR and CONTRACTOR’S Subcontractor and will not be reviewed by the ENGINEER unless specifically called for in the Contract Documents.

3. ENGINEER will not review any required Structural Shop Drawings, Structural Calculations, etc., not prepared or signed by a State of California licensed ENGINEER.

4. ENGINEER will return and will not review any submittal requiring coordination with other submittals until such other submittals or required information is received by the Consultant or ENGINEER.

L. CONTRACTOR’S Submittals: CONTRACTOR’S submittals required for performance of Contracted Work, shall include, but are not limited to, the following:

1. Schedule of Values for all Lump Sum items within the Proposal.

2. Construction Schedule and Notification to ENGINEER of completion of each milestone or percentage increment of the Work as required.

3. Submittal Schedule

4. Daily Construction Reports

5. Shop Drawings and Structural Calculations.

6. Manufacturer’s Data and Specifications.

SUBMITTALS 01330-4

7. Samples

8. Templates

9. Certificate of Compliance

10. Construction Photographs

11. Substitutions

12. Record Drawings and Record Project Manual

13. Operation & Maintenance Manuals

14. Stock Materials, Spare parts, tools

15. Material Testing Results

16. Maintenance Logs and Maintenance Schedule.

M. CONTRACTOR shall conform to the provisions of the Contract Document and as may be specifically directed by the ENGINEER.

1. Preparation and processing of submittals shall be coordinated with Contracted Work operations, which include fabrication, purchasing and delivery of work items so as not to delay Contracted Work operations.

2. In each copy of the Submittal, mark every applicable material, product, equipment, manufacturer’s data, product information, color samples, rating or values, part and model numbers, etc. by red color circle. Each of the submittal items must be clearly distinguishable from other unrelated or similar items listed in the Manufacturer’s Catalog or Technical Specifications, Manuals, etc.

N. Coordination and Submittals:

1. Carefully review and coordinate all aspects of each item being submitted.

2. Carefully review contract drawings and technical sections, verify all work as laid out or indicated meeting the applicable codes and standards.

3. Ensure ample time for reviewing and processing of the submittals by the CITY or other authorized agencies, delays resulting from improper and untimely submittals shall be the responsibility of the CONTRACTOR.

SUBMITTALS 01330-5

4. Verify that all such submittal items conform to the Project Manual requirements noted in the Technical Sections.

5. Verify all site conditions and provide all required dimensions and measurements in Shop Drawings.

6. Where necessary, review the CITY’S comments, make changes and resubmit to local governing agencies for approval. Furnish the ENGINEER copies of the approved plans or drawings for review.

O. CONTRACTOR shall affix to each submittal, the CONTRACTOR’S signature certifying that required coordination has been performed and include on an attached label for processing and recording action taken, noting the following:

1. Name of the Project

2. Date of the Submittal

3. Name and address of Consultant

4. Name and address of the CONTRACTOR

5. Name and address of the Subcontractor(s)

6. Name and address of the Supplier

7. Name and address of the Manufacturer

8. Reference to Specification Section Number and Title

9. Reference to Drawing Sheet Number and detail(s)

10. Submittal Number

11. Priority Number and expected return date.

END OF SECTION
SUBMITTALS 01330-6

THIS PAGE INTENTIONALLY LEFT BLANK
SUBMITTALS 01330-7
SUBMITTALS 01330-8
WATER POLLUTION CONTROL PROGRAM 01572-1
SECTION 01572 EROSION CONTROL PLAN
Contractor shall comply with all laws, codes, ordinances and requirements of governing agencies regarding the discharge of pollutants, air and water pollution control and any other requirements for this project. Within 5 days of the Notice to Proceed, Contractor shall submit two (2) hardcopies of the draft Erosion Control Plan to the City for review. Any corrections or changes shall be made to the Erosion Control Plan, approved by the Engineer and implemented prior to any construction work on this project. The plan shall be updated as necessary or required for compliance purposes.

Payment for work on this item shall be made as a percentage of work completed at each monthly payment. All work under this item shall be as shown on the approved drawing accepted by the City prior to any work on the project. The Contractor shall have all work installed and inspected by the City prior to any work on the project.

Full compensation for this item shall be in accordance with all state and federal NPDES rules, regulations, requirements and laws and shall constitute all work for providing, installing, maintaining and removing all work as required for all excavations, earthwork, grading, grinding, paving, concrete, runoff containment, and any other work performed within the project boundaries.

END OF SECTION
CONSTRUCTION INFORMATION SIGNS 01581-1

SECTION 01581 CONSTRUCTION INFORMATION SIGNS

1.1 THE REQUIREMENT
The City shall provide the Contractor with all required construction information signs for the project. The signs shall be installed at the locations noted in the plans, if included, or as otherwise directed by the Engineer. If the project consists of numerous sites, the construction information signs shall be relocated to each site as work progresses. The construction signs shall be installed the same day work commences on any construction site. If the sign is not installed prior to construction work beginning at a subsequent site, the City will install the information signs at the Contractor’s expense.

The installation of each sign shall be the responsibility of the contractor to include mounting posts, hardware and any related incidentals to ensure the sign is placed in a safe and secure manner. For any sign required for multiple site projects, where the sign is frequently relocated and not anticipated to be installed in the ground on posts, the Contractor shall provide a Type III barricade for mounting. The contractor shall obtain approval from the Engineer following installation of the construction information sign. If the signs are installed in the ground with posts, proper vertical clearance shall be provided. The minimum vertical clearance shall be six feet within a parkway area and seven feet within the sidewalk.

The construction information sign shall remain visible at all times. The contractor shall replace stolen signs at their expense and maintain the signs, ensuring all graffiti, soil, paint, etc. is removed from the sign immediately. Upon completion of the project, each sign shall be removed and returned to the City. If the sign is not returned to the City at the completion of the project in the original condition, the cost of the sign shall be withheld from the final progress payment.

The Contractor shall notify Underground Service Alert (Dig alert) at least 2 working days, but not more than 14 calendar days, prior to performing any excavation.

Full compensation for furnishing all labor, equipment, materials, and tools required to perform the tasks noted above, and as ordered by the Engineer, shall be considered as being included in the various Contract items of work and no separate or additional compensation will be allowed therefore.

END OF SECTION
MOBILIZATION 01721-1

SECTION 01721 MOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Mobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in mobilization (in advance of construction operations and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no mobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for mobilization.

Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Obtaining all permits, licenses, insurance, and bonds. Providing copies to the ENGINEER.

2. Moving onto the Jobsite all of CONTRACTOR’S plant and equipment as required.

3. Erecting temporary buildings and other construction facilities.

4. Installing temporary construction power and wiring.

5. Establishing fire protection system for its temporary facilities.

6. Developing construction water supply.

7. Providing field office trailers for the CONTRACTOR, complete with all specified equipment, furnishings, utility services and required approvals from the CITY.

8. Providing sanitary facilities or connecting to onsite sanitary facilities as specified.

9. Providing for potable water facilities as specified. This includes a means by which all on site CONTRACTOR, Subcontractor or supplier personnel can wash their hands with soap.

10. Arranging for, and erection of, CONTRACTOR’S work and storage yards and sheds.

MOBILIZATION 01721-2

11. Submitting all required Subcontractor insurance certificates and bonds.

12. Posting all CAL/OSHA required notices and establishment of safety programs.

13. Furnishing of Construction Schedule, Contract Price Breakdown and Submittal Schedules.

14. Erecting all temporary fencing, including removal and disposal of existing temporary fencing.

END OF SECTION
SURVEYING 01722-1
SECTION 01722 SURVEYING
PART 1 - GENERAL
A. General

1. The CONTRACTOR shall be responsible for all surveys required to layout the Work and for the accuracy of all survey work for construction.

The CONTRACTOR shall include the cost of all such survey work in their Bid. The CONTRACTOR shall have all construction surveying performed by a `Licensed Land Surveyor' or a `Civil Engineer’ registered by the State of California to perform such work. The ENGINEER reserves the right to verify all survey work done by the CONTRACTOR.

2. The CONTRACTOR shall preserve the initial survey control points for the duration of their usefulness. Monumentation that is subject to disturbance or destruction shall be located and referenced prior to construction and relocated and referenced if necessary after construction, in accordance with the following requirements.

B. Construction Surveys

1. The CONTRACTOR shall provide all reference stakes and form checks necessary for construction and inspection of improvements. All construction staking shall be documented in cut sheets and provided to the ENGINEER. This staking may include but is not limited to: removals, joins, rough grade, slope, utilities, storm drains, sewers, curbs, walks, paving, wall and building stakes; and any other staking necessary for construction and inspection.

C. Reference Or Grade Stakes

1. A reference or grade stake shall be set for each grade change or angle point shown on the plan, standard plan, and shop drawing, in addition to the normal staking interval.

D. Form Checks

1. Forms shall be checked when durable points may be disturbed, removed, or are impractical to be used to verify the design location. The measured location shall be recorded in the survey field notes. All variations from the plan location shall be brought to the attention of the ENGINEER.

E. Staking Intervals And Offset Stake Lines
SURVEYING 01722-2

1. All staking intervals shall be in accordance as directed by the Engineer.

Stake lines shall be set at an offset distance from the improvement to ensure proper grade, station, and alignment.

F. Utility Stakes

1. The CONTRACTOR shall provide stakes for all utilities, public or private, that require location or relocation, unless otherwise stated.

G. Additional Survey Work

1. The CONTRACTOR may be required to furnish additional survey work, such as profiles, restakes, Change Orders, etc., at the request of the ENGINEER or the INSPECTOR.

H. Accuracy

1. The CONTRACTOR shall use appropriate surveying methods to obtain the following standards: For fixed works (i.e. cast-in-place concrete; asphalt pavement, pipes and drains; and other items determined by the ENGINEER) the following survey standards shall be used. The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.015 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.015 foot or less.

2. For excavation purposes, the following survey standards shall be used.

The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.1 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.1 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that semimajor axis of the 95% error ellipse is ±0.1 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.1 foot or less.

I. Survey/Inspector

1. The CONTRACTOR shall provide to the INSPECTOR those
measurements and control points necessary to determine the location and conformance to the plan, line, and grade of the improvements necessary for inspection purposes.

SURVEYING 01722-3
J. Survey Notes

1. The CONTRACTOR shall supply and keep notes on CITY standard format note sheets. The ENGINEER may request copies of, and otherwise review, survey notes at any time during the construction phase of the Project. Upon completion of the Project, the original survey notes shall become the property of the CITY and shall be delivered to the

ENGINEER
PART 2 – MONUMENT PRESERVATION GUIDELINES
A. New & Reconstruction Projects

1. Prior to Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record above or below the surface, within the road right-of-way. It is suggested that this search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument is required.
c. The survey crew shall properly reference all found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item c, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.

2. After Construction and Prior to Notice of Completion a. All covered and disturbed monuments shall be reset with the same or more durable type of monument as the original, in the surface of the construction.

Key monuments shall be a minimum 1” inside diameter iron pipe of appropriate length.
b. A monument box or other protective structure is recommended to be placed around key monuments (section corners, quarter section corners). c. The authorized surveyor shall properly completes a Corner Record or Record of Survey for all set monuments with a change in character, including tag number, and submit it to the County Surveyor for review, signature and filing.

A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.

SURVEYING 01722-4
B. Overlay Projects

1. Prior To Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record and on the surface of the road. It is suggested the search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument within 2” of the road surface is recommended.
c. The survey crew shall properly reference found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item 3, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.

2. After Construction and Prior to Notice of Completion a. All covered or disturbed monuments and surface monuments are reset in the new road surface, or a new monument is set in the new road surface above the buried one.
b. All existing monument boxes will be adjusted to grade or replaced, as appropriate.
c. A monument box or other protective structure should be placed around key monuments (section corners, quarter section corners).
d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for all set monuments and existing monuments with a change in character, including tag number and submits it to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.

C. Slurry Seal Projects

1. Prior To Construction
SURVEYING 01722-5
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies furnished to for the survey crew.
b. All monument boxes shall be located and steps taken to ensure that the survey monuments inside are readily accessible upon completion of the project. c. The survey crew shall diligently searches for survey monuments on the surface of the roadway, and identify said monuments recovered in the field to ensure that they will be protected. The survey crew shall inventory the monuments recovered in the field in a manner that allows for their recovery and inspection after construction.

2. After Construction and Prior to Notice of Completion a. All monument boxes shall be inspected, and appropriate action taken when needed, to ensure that the survey monuments inside are readily accessible. b. The survey crew shall review the inventory of found monuments by field inspection to ensure that all survey monuments are clean and exposed. Those monuments covered after construction is completed shall be uncovered.

D. Monument Tie Preservation

1. Prior To Construction
a. All existing survey monument ties within the scope of the project shall be researched and identified prior to construction. Surveyor may obtain existing tie sheets from the City as available.
b. If it is determined that all ties for a survey monument may be disturbed during construction, the Surveyor shall relocate the monument ties prior to construction, within improvements that will not be disturbed, and file the revised tie sheet with the City. A minimum of three tie points should reference each centerline monument, whenever possible

2. After Construction and Prior to Notice of Completion a. If it is determined that the result of construction will not disturb all survey monument ties for a specific monument, the Surveyor shall replace all monument ties disturbed during construction per the following guidelines:

i. Monument ties shall be placed during the finishing process of the concrete improvements.
ii. Monument ties shall be set below the elevation of the adjacent top of curb to provide protection from any future cleaning, maintenance or work around the tie.
iii. A minimum of three tie points should reference each centerline monument, whenever possible.

SURVEYING 01722-6
b. Once the construction is complete, the Surveyor shall prepare a revised tie sheet, and file with the City for all monument ties disturbed during the construction.

END OF SECTION
POTHOLING 01732-1
SECTION 01732 POTHOLING

1.1 THE REQUIREMENT
A. The CONTRACTOR shall conduct exploratory excavations by potholing to verify or to discover the actual locations and the size of existing underground utilities and improvements. The CONTRACTOR shall take care not to damage existing facilities during potholing operations. Any utility or existing facility (including those located by Underground Service Alert - USA) within 3 feet of any trench or excavation shall be potholed prior to starting the contract work in the vicinity.

Potholing shall be done in each given area where excavation work is to occur at least fourteen (14) calendar days in advance of any excavation or construction in that area, to avoid possible delay in the progress of the Work.

B. Potholing shall consist of excavations at the locations of utilities or other underground facilities indicated on the Drawings, located by USA, or as directed by the ENGINEER. All costs of potholing operations for the utilities indicated on the Drawings shall be included in the CONTRACTOR’S Bid.

C. If an allowance for “Additional Potholing” has been established and included in the SCHEDULE OF WORK AND PRICES, this allowance shall only be used to reimburse the CONTRACTOR for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER. If the total cost of the Work directed under the Additional Potholing allowance differ from the amount set forth in the SCHEDULE OF WORK AND PRICES, the Contract Price shall be adjusted by a Change Order. The adjustment shall be the difference between the total actual costs and the amount included in the Bid, as an additional amount due to the CONTRACTOR or a credit to the CITY, as appropriate.

D. In addition to the potholes indicated on the Drawings, or directed by the ENGINEER, the CONTRACTOR may opt to do further potholing deemed necessary at no additional cost to the CITY.

E. Potholing operations shall conform to all applicable requirements as to sidewall slopes, sheeting and shoring, and all other excavation and trenching provisions specified herein.

F. Potholes shall be identified and protected in accordance with the Engineer’s instructions, the California Manual on Uniform Traffic Control Devices (MUTCD) and Work Area Traffic Control Handbook (WATCH) Standards.

G. The CONTRACTOR’S proposed method of potholing and schedule for potholing shall be submitted to the ENGINEER for approval, at least thirty (30) days prior to the commencement of operation. Any utilities damaged during potholing shall POTHOLING 01732-2
be immediately reported to the ENGINEER and INSPECTOR and repairs made immediately in accordance with the specifications.

H. A complete log of all potholes shall be kept by the CONTRACTOR, showing specific locations and dimensions of trenches. The log shall be verified by the INSPECTOR prior to the backfilling of the potholes. The verified log will be submitted to the ENGINEER and the INSPECTOR within two (2) working days after completion of potholing in each area. Payment for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER will not be made unless these potholes are listed on the verified log.

I. The CONTRACTOR shall record the coordinates, elevations and dimensions of all utilities and improvements verified or discovered by potholing. The records shall be submitted to the ENGINEER within two (2) working days after the completion of potholing in each area. The records shall also include dates of the potholing operations and any additional discovered information or pertinent data.

J. Upon completion of potholing in each area, and after verification of the logs by the INSPECTOR, potholes shall be immediately backfilled and compacted in accordance with the specifications, or restored as directed by the ENGINEER.

END OF SECTION
DEMOBILIZATION 01740-1
SECTION 01740 DEMOBILIZATION

1.1 THE REQUIREMENT
A. General
Whether Demobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in demobilization (upon completion of all contract work and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no demobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for demobilization.

Demobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:

1. Moving off of the Jobsite all of CONTRACTOR’S plant and equipment as required.

2. Dismantling and removing all temporary buildings and other construction facilities.

3. Dismantling and removing all temporary construction power and wiring.

4. Removing all sanitary facilities from the work site.

5. Remove all waste, debris, and rubbish caused by construction operations within the work area, adjacent properties and public roads.

6. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the CONTRACTOR’S Bid.

7. Dismantling and removal of all temporary fencing.

8. Provide City with all required As-Built drawings.

9. All required Corner Records have been filed with the County and all copies provided to the City per Section 01722 Surveying.

10. All items noted within the final inspection (“Punchlist”) have been completed to the satisfaction of the City.

DEMOBILIZATION 01740-2

11. All project photographs as required within Section 01322 Construction Progress Photography have been provided.

12. Notice of Completion (NOC) will not be filed until all work is complete per this Section 01740.

END OF SECTION

APPENDIX A

CHECKLIST OF LABOR LAW REQUIREMENTS

THIS PAGE INTENTIONALLY LEFT BLANK

CHECKLIST OF LABOR LAW REQUIREMENTS

TO REVIEW AT JOB CONFERENCE MEETINGS
Name (print) Date
Company Project
The Federal and State labor law requirements applicable to the contract are composed of, but not limited to, the following:

1. Payment of Prevailing Wage Rates
The contractor to whom the contract is awarded and its subcontractors hired for the public works project are required to pay not less than the specified general prevailing wage rates to all workers employed in the execution of the contract. The contractor is responsible for ascertaining and complying with all current general prevailing wage rates for crafts and any rate changes that occur during the life of the contract.

Information on all prevailing wage rates and all rate changes are to be posted at the job site for all workers to view.

2. Apprentices
It is the duty of the contractor and subcontractors to employ registered apprentices on the public works project under Labor Code Section 1777.5.

3. Penalties
There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code Sections 1775; 1776; 1777.1; 1777.7 and 1813.

4. Certified Payroll Reports
Under Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records showing the name, address, social security number and work classification of each employee and owner performing work; also the straight time and overtime hours worked each day and each week, the fringe benefits, and, the actual per diem wage paid to each owner, journey person, apprentice worker or other employee hired in connection with the public works project. Employee payroll records shall be certified and shall be made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, or shall be furnished to any employee, or his/her authorized representative on request, pursuant to Labor Code Section 1776. Each contractor and subcontractor shall submit its weekly certified payroll reports to the LCR from the agency no less than weekly or within ten days of request. In the event that there has been no work performed during a given week, the certified payroll report shall be annotated: "No work" for that week. Under Labor Code Section 1776(h) there are penalties required for contractor's/ subcontractor's failure to maintain and submit copies of certified payroll records on request. **For projects bidding after April 1, all contractors will need to upload their certified payroll to the Department of Labor Standards Enforcement website. Effective Jan. 1, 2016, ALL projects will require contractors to upload all certified payroll. This requirement is in addition to the request for payrolls by the City of Redlands;

5. Nondiscrimination in Employment
There exist prohibitions against employment discrimination under Labor Code Sections 1735 and 1777.6, the Government Code, the Public Contracts Code, and Title VII of the Civil Rights Act of 1964.

6. Kickbacks Prohibited
Contractors and subcontractors are prohibited from recapturing wages illegally or extracting "kickbacks" from employee wages under Labor Code Section 1778.

7. Acceptance of Fees Prohibited
There exists a prohibition against contractor/subcontractor acceptance of fees for registering any person for public work under Labor Code Section 1779; or for filling work orders on public works contracts pursuant to Labor Code Section 1780.

8. Listing of Subcontractors
All prime contractors are required to list properly all subcontractors hired to perform work on the public works projects covering more than one-half of one percent, pursuant to Government Code 4100 et seq.

9. Properly Licensed and Registered
Contractors are required to be licensed properly and to require that all subcontractors be properly licensed.

Penalties are required for employing workers while unlicensed under Labor Code Section 1021 and under the California Contractor License Law found at Business and Professions Code Section 7000 et seq.

Contractors and subcontractors are also required to be registered with the Division of Labor Standards Enforcement to work on public works projects in California. Requirements for registration and penalties for not being registered are found in Labor Code 1773.3.

10. Unfair Competition Prohibited
Contractors and subcontractors are prohibited from engaging in unfair competition as specified under Business and Professions Code Sections 17200 to 17208.

11. Workers Compensation Insurance
Labor Code 1861 requires contractors and subcontractors be insured properly for workers compensation.

12. OSHA
Contractors and subcontractors are required to abide by the Occupational, Safety and Health laws and regulations that apply to the particular construction project.

13. Undocumented Workers
Contractors and subcontractors are prohibited by the Federal government against hiring undocumented workers, and must secure proof of eligibility/citizenship from all workers.

14. Itemized Wage Statements
Contractors and subcontractors must provide itemized wage statements to employees per Labor Code 226.

In accordance with Federal and State laws and with the awarding agency contract documents, the undersigned prime contractor wishes to assure the City of Redlands that it intends to comply with the above-referenced labor law requirements, fully understanding that failure to comply with the above requirements may subject it to penalties as provided above.

Contractor City of Redlands
Name Printed Name Printed
Signature Signature
Title Title
Date Date

IMPORTANT NOTICE
New Requirements for Contractors Working on California
Public Works / Prevailing Wage Projects
Significant changes in prevailing wage law have recently been made that affect all contractors working on Public Works Projects within California. Please note the following important information:

CONTRACTOR REGISTRATION REQUIREMENT
By April 1, 2015, all contractors must be registered with the Division of Labor Standards Enforcement (DLSE) to work on public works projects in California.

WHO must register?
All contractors and subcontractors working on public works projects in California must be registered. This includes prime contractors, subcontractors and sole owner/operators- everyone performing labor on a public works project.

WHEN is registration required?
Contractors must be registered with the DLSE to bid on all public works projects that bid after March 1, 2015.

All contractors working on public works projects must be registered by April 1, 2015. Registration is valid until June 30 of each year and may be renewed annually. Registrations are currently being accepted.

WHERE do I register?
Registration is done online at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm HOW MUCH is the fee?
Contractor registration fee is currently set at $400 but may increase each year. This fee shall be paid during the initial registration and each annual renewal.

DO I qualify for registration?
Contractors will need to meet minimum qualification standards to be registered. These include:
• Be properly licensed with the Contractors State License Board for your trade. • Provide evidence of workers compensation insurance (if applicable). • Be in good standing (Have no outstanding liabilities for wages, damages, penalties due to an employee or the State, may not be under State or Federal debarment).

WHAT happens if I don’t register?
Unregistered contractors working on or bidding for public works projects will be subject to an immediate $2,000 fine and the $400 registration fee to continue working on the project. Unregistered contractors may be removed from the project by the Awarding Agency. Contractors found working on public works projects without being registered also risk not being approved for registration by DLSE.

ELECTRONIC CERTIFIED PAYROLL REPORTING REQUIREMENTS
Prevailing wage law has been changed to require contractors to submit certified payrolls electronically to the DLSE.

WHO is required to submit certified payrolls?
All contractors, subcontractors and sole owner/operators will be required to submit certified payrolls electronically to the DLSE.

WHEN do I need to submit certified payrolls electronically? If your project is awarded after April 1, 2015, electronic payroll submission is required immediately.

Otherwise, electronic payroll submission will be required for all projects awarded on or after January 1, 2016.

WHERE do I submit my certified payrolls?
For now, certified payrolls can be submitted by contractors to the DLSE at:
https://apps.dir.ca.gov/ecpr/DAS/AltLogin This website address will change when the DLSE implements their online electronic database system which still has not been developed. Alliant will notify contractors when this system is available.

DO I still need to submit hard copy certified payrolls? The City of Redlands will still require hard copy submission of certified payroll reports per your contract. The requirement to submit certified payrolls electronically to the DLSE does not replace the requirement for contractors to submit payrolls to the City of Redlands.

Contact the City of Redlands regarding any questions you may have regarding the new requirements for contractor registration or online submission of certified payroll: (909) 798-7698.

PUBLIC WORKS CONTRACT AWARD INFORMATION (DAS-140)
This is not a request for dispatch of apprentices.

Contract award information must be sent to your Apprenticeship Committee if you are approved to train. If you are not approved to train, you must send the information (which may be this form) to ALL applicable Apprenticeship Committees in your craft or trade in the area of the site of the public work.

Go to: http://www.dir.ca.gov/das/PublicWorksForms.htm for information about programs in your area and trade. The information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Do not send this form to the Division of Apprenticeship Standards.

NAME OF YOUR COMPANY CONTRACTORS STATE LICENSE NO.

MAILING ADDRESS-NUMBER & STREET, CITY, ZIP CODE AREA CODE & TELEPHONE NO.

NAME AND ADDRESS OF PUBLIC WORKS PROJECT DATE YOUR CONTRACT WAS EXECUTED

DATE OF EXPECTED/ACTUAL START OF PROJECT

NAME & ADDRESS OF PUBLIC AGENCY AWARDING CONTRACT ESTIMATED NUMBER OF JOURNEYMAN HOURS

OCCUPATION OF APPRENTICE
THIS FORM IS BEING SENT TO: (NAME AND ADDRESS OF APPRENTICESHIP PROGRAM(S) ESTIMATED NUMBER OF APPRENTICE HOURS

APPROXIMATE/ACTUAL DATES TO BE EMPLOYED

This is not a request for dispatch of apprentices.
*Contractors must make a separate request for actual dispatch, in accordance with Section 230.1(a) California Code of Regulations* Check One of the Boxes Below

1. We are already approved to train apprentices by the
Apprenticeship Committee. We will employ and train under their standards. (Enter name of Committee)

2. We will comply with the standards of
Apprenticeship Committee for the duration of this job only. (Enter name of Committee)

3. We will employ and train apprentices in accordance with the California Apprenticeship Council regulations, including § 230.1 (c) which requires that apprentices employed on public projects can only be assigned to perform work of the craft or trade to which the apprentice is registered and that the apprentices must at all times work with or under the direct supervision of journeyman/men.

Signature Date

Typed Name

Title
2J
DAS-140 FORM - PUBLIC WORKS CONTRACT AWARD INFORMATION
(Title 8, California Code of Regulations, Section 230)
(California Labor Code, Section 1777.5 (e))

SUBMIT CONTRACT AWARD INFORMATION
Prior to commencing work on a contract for Public Works every Contractor shall provide contract award information to the apprenticeship committee for each applicable apprenticeable craft or trade in the area of the site of the public works project that has approved the contractor to train apprentices. Contractors who are not already approved to train by an apprenticeship program sponsor shall provide contract award information to all of the applicable apprenticeship committees whose geographic area of operation includes the area of the public works project. This contract award information shall be in writing on a DAS Form 140, Public Works Contract Award Information or a letter which includes the following information:
(1) Contractor's name, address, telephone number and state license number; (2) The full name and address of the public work awarding agency; (3) The exact location of the public work site;
(4) Date of the contract award;
(5) Expected start date of the work;
(6) Estimated journeyman hours;
(7) Occupation of Apprentice;
(8) Approximate number of apprentices to be employed; and (9) Approximate dates apprentices will be employed.

This information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.

Failure to provide contract award information, which is known by the awarded contractor, shall be deemed to be a continuing violation for the duration of the contract, ending when a Notice of Completion is filed by the Awarding Body, for the purpose of determining the accrual of penalties under Labor Code Section 1777.7.

THE TOP SECTION OF THE FORM COMPLETELY FILLED OUT will provide the information required pursuant to California Labor Code Section 1777.5 and California Code of Regulations Section 230.1.

LOWER SECTION OF THE FORM Check an appropriate box (#1, 2 or 3) for your status.

In addition to the “ORIGINAL(S)” mailed to all applicable Apprenticeship Committees, a copy of this information shall also be submitted to the City of Redlands.

NOTE: The filing of a DAS 140 is not a request for the dispatch of registered apprentices

CONTRACTOR FRINGE BENEFIT STATEMENT
Project Name: Project Location: Today’s Date:

Contractor / Subcontractor Name: Business Address:

In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourly rates for fringe benefits, subsistence and/or travel allowance payment made for employees by the employer on the various classes of work are tabulated below. Please Include Apprentice Rates.

Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Other
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Classification: Effective Date:

Subsistence or Travel Pay:
$________________________

EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Pension

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Training

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Other

$_______________ hr
Paid To:

Name of Plan/Fund/Program:

Address:
__________________________________________________
__________________________________________________
Supplemental statements must be submitted during the progress of the work should there be an increase or change in rates. Use additional sheets as necessary. (Attach a copy of your most recent premium transmittal (including copy of check submitted) into each of the above plans/funds/programs or a letter from the above plans/funds/programs reflecting current payment status).

I certify under penalty of perjury that fringe benefits are paid to the approved plans, funds or programs as listed above.

Print Name and Title Signature and Date (Wet Signature Required) S = STRAIGHT TIME *OTHER – Any other deductions, contributions and/or payments whether or not included or required by prevailing CERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side) SDI = STATE DISABILITY INSURANCE
California Department of
Industrial Relations
Page ______ of ______
NAME OF CONTRACTOR: CONTRACTOR'S LICENSE NO.: ADDRESS:

OR SUBCONTRACTOR: SPECIALITY LICENSE NO.:

PAYROLL NO.: FOR WEEK ENDING: SELF-INSURED CERTIFICATE NO.: PROJECT OR CONTRACT NO.:
(4) DAY (5) (6) WORKERS' COMPENSATION POLICY NO.: PROJECT AND LOCATION:
(2) M T W TH F S S (9)
DATE
(1)

NAME, ADDRESS AND

SOCIAL SECURITY NUMBER

OF EMPLOYEE
NO. OF WITHHOLDING

EXEMPTIONS
(3)
WORK

CLASSIFICATION

HOURS WORKED EACH DAY
TOTAL
HOURS
HOURLY
RATE
OF PAY
(7)

GROSS AMOUNT
EARNED
(8)

DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS

NET WGS

PAID FOR
WEEK
CHECK
NO.

THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS

PROJECT
ALL

PROJECTS
FED.

TAX
FICA
(SOC. SEC.)
STATE

TAX SDI
VAC/

HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O

PUBLIC WORKS PAYROLL REPORTING FORM
Statement of Compliance
Date:______________
I __________________, the undersigned, am the ________________________________ with the authority to act for and on (Print Name) (Position in Business)
behalf of _______________________ certify under penalty of perjury that the records commencing on ______________ and ending on _______________ submitted herein and consisting of ____ pages are the originals, full and corrected documents, which depict the payroll record(s) of actual disbursements by way of cash, check, or whatever form to the individual or individuals names, (1) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work Performed.
(2) That any apprentices employed in the above period are duly registered to a bona fide apprenticeship program registered with the State of California’s Division of Apprenticeship Standards.

PAYROLL/OTHER DEDUCTIONS

1. I herein certify the full and complete Prevailing Wages were paid as currently published and posted by the Director of Industrial Relations, State of California and only deductions as authorized under the laws of the State of California or the laws of United States of America have been made from these sums.

2. All other deductions are clearly listed for each employee on an attachment as required by the Director of Industrial Relations, State of California.

OPTIONAL BENEFIT PLANS
I herein certify that all employee deductions for benefit plans are authorized and the employee(s) are signed up for the plan(s) and are receiving the benefit(s) of the plan(s) listed.
 WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above payroll, payment of fringe benefits as listed in the contract have or will be made to the appropriate programs for the benefit of such employees, except as noted below.
 WHERE FRINGE BENEFITS ARE PAID IN CASH
Each laborer or mechanic listed in the above payroll has been paid as indicated on the payroll, an amount not less the sum of the applicable basic hourly rate plus the amount of the required fringe benefits as listed in the determination for the craft, except as noted below,
Exception(s)
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
I herein certify under the penalty of perjury all of the above is true and correct as submitted. ________________________________________________________________________________________________________ Name Signature
________________________________________________________________________________________________________ Date Payroll #
Remarks
____________________________________________________________________________________________________ 2N

CONTRACTOR INFORMATION SHEET
Job Name: _________________________________________ Category: ____________________________________ Prime Contractor: ___________________________________________________________________________________ Subcontractor: ______________________________________ License#: _____________________________________ Address: ____________________________________________________________________________________________ Phone #: ___________________________________________ Payroll Report Contact: _______________________ Email Address: _____________________________________________________________________________________ Fax #: ______________________________________________ Contract Amount: ____________________________ Estimated Start Date: _______________________________ Estimated End Date: _________________________ ANTICIPATED TRADES/CLASSIFICATIONS:
______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ SUB-CONTRACTORS (if applicable)
Name: License #: Phone/ Fax #: Contact:
______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________

THIS PAGE INTENTIONALLY LEFT BLANK

APPENDIX B

CITY OF REDLANDS

WORKDAY CONSTRUCTION SCHEDULE

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 2026 APPENDIX B

CONSTRUCTION WORKDAY CALENDAR

JANUARY FEBRUARY MARCH

S M T W T F S S M T W T F S S M T W T F S
1 2 3 1 2 3 4 5 6 7 1 2 3 4 5 6 7
1 2 3 32 33 34 35 36 37 38 60 61 62 63 64 65 66
4 5 6 7 8 9 10 8 9 10 11 12 13 14 8 9 10 11 12 13 14
4 5 6 7 8 9 10 39 40 41 42 43 44 45 67 68 69 70 71 72 73 11 12 13 14 15 16 17 15 16 17 18 19 20 21 15 16 17 18 19 20 21 11 12 13 14 15 16 17 46 47 48 49 50 51 52 74 75 76 77 78 79 80 18 19 20 21 22 23 24 22 23 24 25 26 27 28 22 23 24 25 26 27 28 18 19 20 21 22 23 24 53 54 55 56 57 58 59 81 82 83 84 85 86 87 25 26 27 28 29 30 31 29 30 31
25 26 27 28 29 30 31 88 89 90

APRIL MAY JUNE

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 1 2 1 2 3 4 5 6
91 92 93 94 121 122 152 153 154 155 156 157
5 6 7 8 9 10 11 3 4 5 6 7 8 9 7 8 9 10 11 12 13
95 96 97 98 99 100 101 123 124 125 126 127 128 129 158 159 160 161 162 163 164 12 13 14 15 16 17 18 10 11 12 13 14 15 16 14 15 16 17 18 19 20 102 103 104 105 106 107 108 130 131 132 133 134 135 136 165 166 167 168 169 170 171 19 20 21 22 23 24 25 17 18 19 20 21 22 23 21 22 23 24 25 26 27 109 110 111 112 113 114 115 137 138 139 140 141 142 143 172 173 174 175 176 177 178 26 27 28 29 30 24 25 26 27 28 29 30 28 29 30
116 117 118 119 120 144 145 146 147 148 149 150 179 180 181 31 151

JULY AUGUST SEPTEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 1 1 2 3 4 5
182 183 184 185 213 244 245 246 247 248
5 6 7 8 9 10 11 2 3 4 5 6 7 8 6 7 8 9 10 11 12
186 187 188 189 190 191 192 214 215 216 217 218 219 220 249 250 251 252 253 254 255 12 13 14 15 16 17 18 9 10 11 12 13 14 15 13 14 15 16 17 18 19 193 194 195 196 197 198 199 221 222 223 224 225 226 227 256 257 258 259 260 261 262 19 20 21 22 23 24 25 16 17 18 19 20 21 22 20 21 22 23 24 25 26 200 201 202 203 204 205 206 228 229 230 231 232 233 234 263 264 265 266 267 268 269 26 27 28 29 30 31 23 24 25 26 27 28 29 27 28 29 30
207 208 209 210 211 212 235 236 237 238 239 240 241 270 271 272 273 30 31
242 243

OCTOBER NOVEMBER DECEMBER

S M T W T F S S M T W T F S S M T W T F S
1 2 3 1 2 3 4 5 6 7 1 2 3 4 5
274 275 276 305 306 307 308 309 310 311 335 336 337 338 339 4 5 6 7 8 9 10 8 9 10 11 12 13 14 6 7 8 9 10 11 12
277 278 279 280 281 282 283 312 313 314 315 316 317 318 340 341 342 343 344 345 346 11 12 13 14 15 16 17 15 16 17 18 19 20 21 13 14 15 16 17 18 19 284 285 286 287 288 289 290 319 320 321 322 323 324 325 347 348 349 350 351 352 353 18 19 20 21 22 23 24 22 23 24 25 26 27 28 20 21 22 23 24 25 26 291 292 293 294 295 296 297 326 327 328 329 330 331 332 354 355 356 357 358 359 360 25 26 27 28 29 30 31 29 30 27 28 29 30 31
298 299 300 301 302 303 304 333 334 361 362 363 364 365 City Holiday
Closed

THIS PAGE INTENTIONALLY LEFT BLANK

APPENDIX C

PERMITS

THIS PAGE INTENTIONALLY LEFT BLANK
PERMIT NO. _________
Name: Phone:

Address: City: Zip:

Contractor: USA ID No.:

Contractor License No.: Type: Cal OSHA No.:

Construction Start Date:

Development No.: Plan No.:

Street Name:

Cross Streets:

Address:

For the purpose of performing the following work:

Applicant/Agent Signature:

EACH
EA $ $ 43.00 EA =$ Truck Route Permit Required:

SF $ $ .44 SF =$
SF $ $ .87 SF =$
LF $ $ 3.28 LF =$ Closure Permit With
LF $ $ 2.19 LF =$ Traffic Plan Required:

SF $ $ .09 SF =$
SF $ $ .09 SF =$
EA $ $ 43.00 EA =$ Water Shutdown Required:

EA $ $ 2,568.00 EA =$
EA $ $ 2,011.00 EA =$
CY $ $ 130 CY =$ Bond Required:

LF $ $ 5.21 LF =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$
EA $ $ 43.00 EA =$ Conduit Material:

EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$ Conduit Size:

LF $ $ 1.73 LF =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
EA $ $ 43.00 EA =$
LF $ $ 1.73 LF =$
SF $ $ .18 SF =$
EA Fire Flow Test……………………………… $ EA =$
SF $ SF =$
EA $ $ 55.00 EA =$ Calculated By
HR OT/Off Hrs Inspection (2 HR Min) $ $ 122.60 HR =$
$ =$
$ =$
SUBTOTAL PERMIT FEE $
PERMIT FEE work complete within specified date from issuance = $ 339.00 fee.

Municipal Utilities & Engineering
$
TOTAL ENCROACHMENT PERMIT FEE $

0.00 $339.00

86.00 86.00

86.00 86.00

86.00 Application for Road / Encroachment Permit
City of Redlands - Municipal Utilities & Engineering Department Anticipated Completion Date:

I hereby request permission to construct/install improvements/facilities within the City of Redlands road right-of-way at the following location:

86.00 86.00

86.00 86.00

86.00 86.00

86.00 86.00

86.00 86.00
BASE
Date:

Driveway Appr, Res/Comm……………….

Sidewalk……………………………………
Cross Gutter/Spandrel……………………
Crushed Aggregate Base…………………
Curb & Gutter………………………………
Curb/Berm………………………………….

Traffic Signal - Modification……………….

SHADED AREA FOR OFFICIAL USE ONLY
In accordance with Plans approved by the Municipal Utilities & Engineering Director and/or the Standard Specifications and Detail Drawings of the City of Redlands for the quantity and type of improvements listed below:

86.00 Street Light………………………………… 86.00
Traffic Signal - New……………………….

Asphalt Pavement…………………………

86.00 86.00

86.00 86.00

10.00 (Effective 10/7/2020)
PENALTY FEE 25% of total permit fee if issued after commencement of work Sewer Manhole…………………..……….

Reinforced Concrete………………………
Storm Drain Pipe…………………………..

Curb Inlet/Outlet Structures………………
Water Shutdown…………………………..

Fire Service…………………………………
Sewer Cleanout……………………………
Sewer Lateral………………………………
Water Main - Potable……………………..

Water Main - Non-Potable……...………..

Fire Hydrant Assembly……………………
Water Service Lateral……………………..

Storm Drain Manhole/Junction Box……..

Curb Core…………………………………..

Sewer Main……………………..…………

86.00 86.00

86.00 86.00

86.00 79.00
Excavation/Utility Trench………..….…….

Street Patch………………………………..

Warranty Fee (Street Cut)……………..…
Traffic Safety Setup………………………..

YES NO
YES NO
YES NO
YES NO

THIS PAGE INTENTIONALLY LEFT BLANK

APPENDIX D

CONTRACTOR SAFETY PROGRAM

THIS PAGE INTENTIONALLY LEFT BLANK

CONTRACTOR

SAFETY PROGRAM
Rev. July 2024

TABLE OF CONTENTS
I. POLICY......................................................................................................................3 II. AUTHORITY..............................................................................................................3 III. SCOPE.....................................................................................................................3 IV. DEFINITIONS...........................................................................................................3 V. RESPONSIBILITIES ....................................................................................................4 RISK MANAGEMENT ..............................................................................................................................................4 PROJECT MANAGER (CITY) ..........................................................................................................5 INSPECTOR (CITY) .....................................................................................................................5 EMPLOYEES (CITY) ....................................................................................................................5 CONTRACTOR.........................................................................................................................................................5 PROJECT SAFETY OFFICIAL .....................................................................................................................................6 VI. PROGRAM ..............................................................................................................6 SAFETY PREQUALIFICATION QUESTIONNAIRE...................................................................................................... 6 APPEAL PROCESS....................................................................................................................................................7 CONSTRUCTION PROJECTS (TIER I AND TIER II)................................................................................ 8 INSPECTIONS..........................................................................................................................................................9 TRAINING/DOCUMENTATION ...............................................................................................................................9 NON-COMPLIANCE ................................................................................................................................................9 CITY PERSONNEL..................................................................................................................................................... 9 VII. RECORDKEEPING ................................................................................................. 10 VIII. ADDITIONAL REFERENCES ...................................................................................10 ACKNOWLEDGMENT OF RECEIPT (A) ...........................................................................................11 SAFETY PREQUALIFICATION QUESTIONNAIRE (B)............................................................................12 NOTICE OF NONCOMPLIANCE (C) ...............................................................................................13 JOB HAZARD ANALYSIS (D) ........................................................................................................14 INCIDENT INVESTIGATION FORM (E) ............................................................................................ 15 3 I. Policy
The purpose of this Contractor Safety Program (“CSP”) is to ensure, as best as reasonably possible, the protection and safety of all persons and property during construction activities undertaken by private contractors on behalf of the City of Redlands (“City”). The City has a comprehensive and structured approach in outsourcing services performed on City facilities by third-party persons and entities (“Contractor(s)”). The first phase of this comprehensive approach includes actively screening Contractors based on safety records, safety performance, and safety compliance. After the qualified Contractor is awarded a contract, the Contractor must then ensure compliance with all local, state, federal and Cal/OSHA regulations applicable to the contracted scope of work, and requirements set forth within this CSP. The Contractor, its agents, and personnel must adhere to the policies and procedures set forth by this CSP and all applicable laws and regulations.

II. Authority
California Code of Regulations, Title 8, Section 336.10 “Determination of Citable Employer” California Code of Regulations, Title 8
“Greenbook” Standard Specifications for Public Works Construction Redlands Municipal Code
California Building Code
III. Scope
This CSP applies to all Contractors who provide or render construction or improvement services for Cityowned property and facilities.

The Contractor services covered under this CSP include, but are not limited to, the following:

A. New construction;
B. Remodeling;
C. Facility maintenance orrepair;
D. Equipment installation or maintenance; and
E. Services (i.e. janitorial, fleet operations, landscaping,etc.) Consultants/ Professional service providers are exempt from having to submit a Safety Prequalification Questionnaire (“SPQ”), prior to the beginning of work, but they are expected to be compliant with industry best practices with regards to maintaining a safe work environment for their employees andothers.

IV. Definitions
A. Contract – any written agreement between the City of Redlands and a Contractor, to perform a specified scope of work on City facilities. With respect to this policy, a contract includes, but is not limited to: awarded purchase orders, bids, and/ or projectcontracts.

B. Construction Work – construction, alteration, and/or repair, including painting anddecorating.

C. Contractor – a person or entity (including all personnel) awarded a contract to perform work on City property or facilities.

D. D.A.R.T Rate – Injuries and illnesses severe enough to warrant: Days Away, Restrictions and Transfers. The DART rate is calculated using the following formula: Number of OSHA Recordable injuries and illnessesthatresulted in Days Away x 200,000/divided by total hours worked by all employees during the year covered.
4 E. Designated Work Area – an area where it is necessary to restrict or limit entry or access of nonessential personnel or the public. Examples include work areas involving remediation abatement, demolition, excavation, and overheadlifting.

F. Facilities – any building or property owned by the City ofRedlands.

G. Hazard – source or situation with a potential for harm in terms of injury or health, damage to property, damage to workplace environment, or a combination ofthese.

H. Job Hazard Analysis (“JHA”) – a technique that focuses on job tasks as a way to identify hazards before they occur. It focuses on the relationship between the worker, the task, the tools, and the work environment. The objective is to eliminate the risk or to utilize control measures to reduce the risk.

I. North American Industry Classification System (“NAICS”) – is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. businesseconomy.

J. Non-compliance – any deviation from standards, practices, processes, procedures, regulations etc. that could either directly or indirectly lead to injury or illness, property damage, damage to the workplace environment, or any combination of thesecriteria.

K. Notice of non-compliance – form provided to the Contractor by the City alerting the contractor of non-compliance with City specifications, Cal/OSHA regulations, or any other generally accepted safe work practice.

L. Non-compliant hazardous work condition – any hazard that is considered to be non-compliant with State or Federal safety and health regulations, City specifications, or any inconsistency with generally accepted work practices.

M. Personnel – all Contractor employees, contractors, sub-contractors and agents providedaccess to City property or facilities.

N. Recordable Incident – any injury or illness resulting in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness per OSHA Section 1904.7(a).

O. Safety Tailgate – informalsafety meeting generally conducted at the job site prior to the commencement of a job or work shift.

P. Services – any and all, labor, duties, functions and activities required to be performed by the Contractor under the contract and any subsequentaddenda.

V. Responsibilities

RISK MANAGEMENT
A. Update, maintain, and administer thisCSP;
B. Maintain centralized records of training, site visit data, written programs, tailgate meetings, permits, and all other necessary contractor relateddocumentation;
C. Provide technical assistance to Engineeringpersonnel; D. Attend Pre-construction meetings and progress meetings asneeded; E. Provide assistance on safety inspections as needed;
F. Review safety submittals;
G. Provide guidance on pre-qualification determination;and H. Provide training to affected city personnel with responsibilities under thisprogram. 5 PROJECT MANAGER (CITY)
The Project Manager has the authority to delegate any or all portions of this CSP to subordinates, but the Project Manager will be held accountable for their compliance. The Project Manager shall contact Risk Management, as necessary, for assistance in relation to this CSP.

A. Ensure safety hazards are addressed in a timelymanner; B. Communicate safety concerns during pre-construction meetings and progressmeetings; C. Inform impacted employees of construction activities scheduled in their workarea; D. Enforce pre-qualification procedures in bidding process;and E. Ensure this CSP is properly executed.

INSPECTOR (CITY)
The City of Redlands construction inspector is not a safety professional and will only provide “Notice of NonCompliance” for obvious and serious non-compliant conditions.

A. To the best of their abilities, inspect work sites for safetyhazards; B. Communicate safety concerns to Contractor;
C. Provide Contractor with “Notice of Non-Compliance” when serious conditions occur or repeat violations; D. Collect documentation needed for constructionworksites; E. Submit documentation to Risk Management forrecordkeeping; F. Maintain photo documentation of safety hazards;
G. Never enter situations that can harm or endanger himself/herself; H. Never use personal protective equipment (PPE) or enter situations, which they are not trained for; I. Contact Emergency Medical Services (911) and Risk Management in case of emergency;and J. Attend and communicate safety concerns in progressmeetings.

EMPLOYEES (CITY)
A. Immediately notify the Project Manager, inspector, or Risk Management of any safety related concerns at a Contractor job site; and
B. Contact Emergency Medical Services (911) and Risk Management in case of emergency.

CONTRACTOR
Where relevant and applicable, the Contractor’s responsibilities shall include:

A. Compliance with requirements and responsibilities detailed within the Contractor Safety Program; B. Ensure all local regulatory requirements are met and all necessary permits are obtained before conducting work on behalf of theCity;
C. Designate a Project Safety Official by name who shall always be available to abate safety hazards; D. Ensure all personnel have the appropriate qualifications and training to perform the contracted work (Copies of current training documentation and certifications must be on file with theCity); E. Inform City Project Manager or inspector of any job site safety hazards or concerns; F. Inform City Project Manager if any suspected asbestos-containing material is located; G. Conduct and submit Job Hazard Analysis (JHA) before work and as required by change of tasks; H. Conduct and submit Safety Tailgates on a bi-weeklybasis; I. Provide all required PPE necessary to conduct work safely and in accordance with required local regulations;
J. The safety of all individuals who enter worksite;
K. Spill cleanup;
L. Immediately report any incidents, accidents, near misses, unsafe conditions, or unsafe acts involving any jobsite personnel;
6 M. Arrange for the properstorage and removal of waste generated prior to the completion of job, and provide confirmation that the materials have been removed or disposed of in a manner compliant with all applicable environmentalregulations;
N. Removing all equipment used during work activities and ensuring proper housekeeping of designated work area at the end of each workday and upon completion of thejob; O. Contact Emergency Services (911) and Project Manager in the event of an emergency; and P. For the actions of their subcontractors, as they may pertain to this CSP, including their adherence to its contents and review of this document.

PROJECT SAFETY OFFICIAL (CONTRACTOR)
A. Shall always be at the work site;
B. Must be thoroughly familiar with the Contractor’s Injury and Illness Prevention Program (IIPP) and Code of Safe Practices;
C. Shall always be available to abate any potential safety hazards;and D. Shall have the authority and responsibility to shut down an unsafe operation, if necessary.

VI. Program

SAFETY PREQUALIFICATION PROCESS
A. The safety prequalification process is intendedto:
• Provide the City with knowledge of past and current safety performance of Contractors working on City construction projects;
• Improve Contractor compliance with City safety rules, including safe work practices required by applicable regulations and laws; and
• Improve safety during Contractor activities.

B. A copy of the SPQ shall be provided to each person or entity bidding on a project, as part of the bidding process.

C. The completed questionnaire shall be returned and reviewed prior to awarding contract work, with supporting information provided as indicated by responses on the questionnaire.

D. The SPQ shall be submitted to 35 Cajon St., Suite 4
Redlands Ca, 92373
Attention: Project Name-Contractor Name-SPQ
E. The following criteria and information relating to the Contractor will be reviewed prior to awarding contract:
• Contractor License;
• Incident Rates;
• OSHA Citations;
• Safety Policies;
• Safety Programs and Procedures;
• Compliance History on City Projects; and
• Certification Statement.

F. Contractor must qualify in each section to be approved for the award of a contract.

G. If a Contractor failsto pass prequalification procedure, the City has the right to disqualify the Contractor’s proposal.
7 H. All costs associated with compliance with City of Redlands prequalification requirements shall be at the sole expense of the Contractor.

I. If a Contractor provides information that is later determined to be false, or improperly withholds information, the Contractor will be immediately disqualified.

J. Any questions or information relating to filing this questionnaire may be answered by reaching:
• Engineering: (909) 798-7698; or
• Risk Management: (909) 798-7514

DISQUALIFICATION APPEAL PROCESS
This provision is established pursuant to Public Contract Code section 20101(d) which requires every public agency that requires prospective biddersto prequalify pursuant to the law to establish “a processthat will allow prospective biddersto dispute their proposed prequalification rating prior to selection of an alternate bidder.” If the City intends to disqualify a bidder based upon the bidder’s safety record, the City will notify the bidder in writing and provide the bidder with any supporting evidence that has been received from others or adduced because of an investigation by the City. The notice of intention shall be sent by certified mail with return receipt requested or by overnight mail via a delivery service that provides online tracking which identifies the date of the prospective bidder’s receipt of the notice, and shall include notice that the bidder has the right to, and may request a hearing to rebut any evidence used as a basis for disqualification and to present evidence to the City as to why the prospective bidder should be found qualified. Requests for a hearing must be made by written request to the City within ten calendar days ofthe date of the prospective bidder’s receipt of the City’s notice of intention. If the bidder does not request a hearing within the time allowed, the City’s determination shall stand unchallenged and become final.

Within seven calendar days of receiving the bidder’s request for a hearing, the City shall notify the bidder in writing of the date, time and place of the hearing. The hearing shall be held no sooner than ten (10) calendar days and no later than fifteen (15) calendar days afterthe notice is given. The notice shall inform the bidder of itsright to present testimony and documents in support of its position.

The hearing shall be conducted before the Redlands City Manager, which may be continued from time to time as reasonably determined by the City Manager but shall not exceed forty five (45) days. At the conclusion of the hearing, and after considering all testimony and documentation presented, the City Manager shall issue a written decision no later than five calendar days following the hearing. The City Manager’s decision shall be final and is not subject to further appeal to the City.

The bidder shall not be entitled to bid on any contracts with the City until it has met the safety pre-qualification standards. If the City Manager approves an appeal, the contractor will have been deemed to meet the qualification standards and it will be valid for one year. The bidder shall have the right to withdraw its application for prequalification or its appeal at any time before the City Manager’s decision becomes final. Such withdrawal will not preclude the bidder from re-applying for prequalification.

CONSTRUCTION PROJECTS
A. After a contract is awarded, the Contractor shall maintain, throughout the duration of the project, safety measures as necessary to protect the public and workers within, or in the vicinity of, the designated work zone. This includes an evaluation of the work to be performed and the hazards likely to be encountered.

Contractors are expected to follow, at a minimum, all pertinent laws, rules, and regulations for the location in which they will be working. Where applicable, Contractor Safety Programs will meet or exceed City programs/ procedures and are subject to review and approval by the City prior to contract execution.

B. Job Hazard Analysis(“JHA”)

1. Prior to a notice to proceed a JHA must be completed utilizing the City’s form, or equivalent, to assess the hazards present in the designated work area. Any information requested on the City’s form, but not stated on the equivalent form utilized, shall be provided separately with the original submission.

2. All members of the construction unit must sign the JHA to acknowledge hazard abatement procedures.

3. JHA must be kept at job site accessible to all impactedpersonnel.

4. Failure to follow JHA procedures may lead to termination of the contract.

C. Personal Protective Equipment(“PPE”)

1. All required PPE must be always worn during workactivities.

2. All mandatory PPE must be highlighted in theJHA.

3. The Contractor shall provide PPE.

4. Failure to follow PPE guidelines may lead to termination of the contract.

D. Safety Tailgates

1. Safety Tailgate Meetings must be held on a biweekly basis for all constructionprojects.

2. The first meeting shall take place on Day 1, Week 1 and every other week thereafter.

3. Tailgates shall be signed by all personnel and submitted to Construction Inspector for recordkeeping.

4. Tailgate topics should be specific to the scope of work of theproject.

E. Injury Reporting

1. Contractors shall immediately report injuries or accidents to the Project Manager (regardless of severity). Additionally, contractors are responsible for and must also conduct accident investigations of any injuries that occur on site and provide results to the Project Manager.

2. Use the City Incident Investigation Form (Attachment E), or equivalent, to meet thisrequirement.

F. Spill Prevention

1. The Contractor is responsible for any spill within the confines of the project and those outside of the construction limits caused by the Contractor’s defective equipment, containers, or personnel.

2. Secondary spill containment systems shall be used to prevent contamination of the environment.

G. Construction in OccupiedBuildings

1. When building occupants are present during construction projects additional safeguards must be implemented to eliminate exposures and complaints. Dust/ particulates from demolition, sanding and other construction activities must be controlled by adequate ventilation, or containment and negative air ventilation systems based upon the specific type of activity and particle. Similar controls must be utilized for odorous activities including, but not limited to, carpet adhesive, painting, welding, and coatings.

2. The Contractor shall ensure that the HVAC system is protected to prevent contamination. If an HVAC system is unprotected and contaminated by any construction/demolition materials, the Contractor shall be held responsible for the cost of cleaning the system and any subsequent repairs therein.

3. Negative air ventilation systems shall have appropriate filtration and be exhausted outside of the building.

INSPECTIONS
A. Follow-up inspections will be executed to enforce compliance with safety and health requirements.

B. Follow-up inspections will be conducted as part of routine site inspections by construction inspector and Risk Management employees.

C. The SPQ aims to provide the City with knowledge of Contractor safety history and safety practices. This minimizes the need for an increased frequency of inspections. In addition, the City will take the following guidelines into consideration when determining the frequency of inspections.

1. Scale of project;

2. The frequency with which the number and types of hazards change as the work progresses;

3. More frequent inspections will be implemented in the beginning of the project;and

4. When the Contractor has never worked for theCity.

TRAINING/DOCUMENTATION
A. The contractor will ensure that all personnel are trained for the scope of work they are assigned, as well as the equipment they will beutilizing.

B. Documentation shall be on file with the City prior to projectstart.

C. Personnel missing training documentation shall not be permitted to work on awarded City projects.

D. Training requirements are mandated by Federal and State Regulations. This may include, but is not limited to, the programs listed in the SPQ.

NON-COMPLIANCE
A. Contractor compliance issues shall be documented on the “Notice of Non-Compliance” form. A copy of this form shall be provided to the Contractor for completion.

B. Upon receipt of the completed “Notice of Non-Compliance” form, the Project Manager and Risk Management will evaluate, based on the incident, and identify, as appropriate, any additional corrective and/or preventive actions for completion.

C. If immediate correction is not feasible, the project will be temporarily stopped until the issue is adequately resolved.

D. City staff with authority to stop work are:

1. Construction Inspector;

2. City Project Manager;

3. City Manager; and

4. Risk Management staff.

E. Any violation or deviation from safety rules, procedures, or regulations, based on evaluation, may be subject to all disciplinary actions listed asfollows:

1. Verbal warning

2. Written warning-Notice ofNon-Compliance (work may not continue until approved corrections are implemented);

3. Dismissal of non-complying personnel; and/or

4. Termination of Contract.

The City of Redlands maintains the right to terminate any contract for the violation of safety issues without liability to the City.

CITY PERSONNEL
A. All affected City employees will be informed in advance of any construction related work or other contract work which has the potential for impacting their workplace. Notifications will be made to all affected employees via e-mail or written memo by the Project Manager or designee. Notifications must include the following information:

1. Start and end dates of the work to becompleted;

2. Work areas to be affected;

3. Description of work to be completed;

4. Name and phone number of Project Manager;

5. Name and phone number of Construction Inspector; and

6. Name and phone number of Risk Management.

B. Employees should be instructed to notify the Project Manager regarding logistical issues or other concerns. Safety and Health concerns should be directed to either the Project Manager, Inspector, or Safety Specialist.

VII. Recordkeeping
The City’s Human Resources / Risk Management Department will maintain all records prepared in association with this CSP, with copies also place on file with the office of the City Clerk.

VIII. Additional References
https://www.dir.ca.gov/title8/336_10.html
Attachment A
11 City of Redlands
Acknowledgment of Receipt Statement
I acknowledge by signing this document, that I have received and reviewed the City of Redlands’ Contractor Safety Program and understand that it contains valuable information on the City’s policies and procedures regarding employee safety as it pertains to Contractor activities. Furthermore, I acknowledge that failure to comply with any of these procedures may lead to termination of the contract with the City.

Contractor Signature Contractor Title:

Contractor Name (Print) Date Signed
If you have any questions regarding this document, please contact the Risk Management Division at (909) 798-7514.

Attachment B
12 Company Name:

Contractor License #: Expiration Date:

Address:

City: State: Zip Code:

Name of Person Submitting Application:

Title: Telephone #:

Email Address:

Identify the highest-ranking Safety/Health Professional in your Company:

Name:

Title: Telephone #:

CITY OF REDLANDS

SAFETY PREQUALIFICATION QUESTIONNAIRE
Omitting or reporting false information on this questionnaire may result in disqualification of bid.

The City of Redlands reserves the right to conduct random or for-cause audits of information stated in this questionnaire. If deemed necessary, additional documentation may be requested by the City to verify responses on this questionnaire.

SECTION 1 – GENERAL INFORMATION
13 INCIDENT RATES
Provide your actual injury and illness data below:

Provide the NAICS Code Number that bestrepresents
your Firm:

Provide any additional numbers here:
(Provide three full years of data) Last Calendar 2 Years Ago 3 Years Ago Number of hours worked by all employees:

Total Recordable Incident Rate*:

D.A.R.T. Rate*:

Total Number of Fatalities:

WORKERS’ COMPENSATION INFORMATION

1. Provide your Workers’ Compensation Experience Modification Rate (EMR) Data:

Policy Year EMR
* If your current EMR is greater than 1.25, initialing here certifies that you will provide a competent, full- time person or representative responsible for safety for all City projects:

Current EMR*
*lnitialing here certifies that your firm does not have an EMR:
(Submit a copy of your firm's Loss Run Reports for the last three years if your firm does not have an EMR.)
1 Year Ago:
2 Years Ago: Name of your firm’s Workers’ Compensation carrier:
3 Years Ago: Phone Number of Workers’ Compensation carrier

2. Is your firm self-insured for Workers' Compensation claims? Yes  No  (If yes, please attach a copy of the latest Annual Report to the State of California Department of Industrial Relations and/or State of California Certificate of Self-Insurance.) SECTION 3– CITATION HISTORY

1. Has your firm received any regulatory citations in the last threeyears? Yes  No  If yes, please answer the question below.

SECTION 2 – INCIDENT RATES & WORKER’S COMPENSATION INFORMATION Incident Rate = [(Total Recordable Cases X 200,000 hours)/ Number of hours worked by all employees] D.A.R.T. Rate = [(Total Number of entries for Days Away, Restricted and Job Transfer X 200,000 hours)/ Number of hours worked by all employees]
If your latest incident rates and D.A.R.T. rates are greater than 100% of the industry average for all your NAICS code Numbers Listed, your bid may be disqualified.

The industry average can be found at www.bls.gov
14 2. Were any of the confirmed (Closed) citations classified as Serious, Willful, Repeat, or Failure to abate?
Yes  No 

3. If yes, please explain:

4. Have you abated all the citations issued to you in the last three years Yes  No  If no, please explain abatement action plan:

SECTION 4 – SAFETY POLICIES
Questions (Please check YES or NO) YES NO*

1. Does your company provide and adhere to a written Illness Prevention Program (IIPP) (CCR Title 8 §3203(a))? If yes, a copy of the program will be required on-hand at the job site throughout the duration of the contract. Please attach a copy to your bid proposal.  

2. Does your company provide and conduct Tailgate Meetings or equivalent with employees at least every 10 working days? (CCR Title 8 §1509(e))
 

3. Does your company have a policy for disciplinary action for unsafe behavior ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203(a)(2))  

4. Does your company provide and abide by a written Code of Safe Practices that relates to your firm’s operations. (CCR Title 8 §1509(b)) If yes, a copy of the Code of Safe Practices will be required on-hand at the job site throughout the duration of the contract. Please attach a copy with your bid proposal.  

5. Does your company perform JHAs? (CCR Title 8 §1511(b)  

6. Does your company provide training and retraining programs for ensuring employee compliance with safe and healthy work practices? (CCR Title 8 §3203 (a)(2), (a)(7)  

7. Does your company provide training and retraining programs for ensuring employee compliance   *Please provide reason(s) for NO answer in the box below or on a separate sheet of paper.

Failure to provide the above-referenced documents will result in the contractor’s bid being disqualified.

PLEASE ANSWER ALL QUESTIONS BY CHECKING YES OR NO, AND ATTACHING APPROPRIATE DOCUMENTS THAT MAY APPLY OR AS REQUESTED.

SECTION 5 – SAFETY PROGRAMS AND PROCEDURES
15 YES NO

1. Is Confined Space work anticipated in the scope of the work awarded? (If no, please proceed to Question 2)  
If yes, please attach the following: Attached?
Copy of written Confined Space Entry Procedure  
List of personnel authorized on jobsite to work in confined space(s)   List of personnel authorized on jobsite to serve as Rescue Team   Verification of personnel training (copies of certs, cards, etc.)  

2. Is work requiring Lockout/Tagout protocols anticipated in the scope of the work awarded? (If no, please proceed to Question 3)  
If yes, please attach the following: Attached?
Copy of written Lockout/Tagout (LOTO) Procedure  
List of personnel authorized on jobsite to perform LOTO   Verification of personnel training (copies of certs, cards, etc.)  

3. Is work requiring a personal lift anticipated in the scope of the work awarded? (If no, please proceed to Question 4)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use lifts   Verification of personnel training (copies of certs, cards, etc.)  

4. Is work requiring a forklift anticipated in the scope of the work awarded? (If no, please proceed to Question 5)  
If yes, please attach the following: Attached?
List of personnel authorized on jobsite to use a forklift   Verification of personnel training (copies of certs, cards, etc.)  

5. Is work requiring a crane anticipated in the scope of the work awarded? (If no, please proceed to Question 6)  
If yes, please attach the following: Attached?
Copy of written Crane Program  
Copy of all expected Crane operators’ Certifications   List of personnel designated as Competent under Crane program   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required 16 6. Is Hot Work (as defined by OSHA) anticipated in the scope of the work awarded? (If no, please proceed to Question 7)  
If yes, please attach the following: Attached?
Copy of written Hot Work Procedure  
List of personnel authorized on jobsite to perform Hot Work   Verification of personnel training (copies of certs, cards, etc.)  

7. Is Trenching/ Excavation work anticipated in the scope of the work awarded? (If no, proceed to Question 8)  
Is a plan in place for the disposal of all material that cannot be returned to the trench/ excavation?   Are appropriate materials for barricading or securing work area at jobsite?   Has a permit from the Department of Industrial Relations for excavations deeper than 5 feet been obtained?  
If yes, please attach the following: Attached?
Copy of written Trenching/ Excavation Procedure  
Copy of Permit if trench is to exceed depth of 5 feet   List of personnel designated as Competent under Trenching/ Excavation Program   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required

8. Is electrical work anticipated in the scope of the work awarded? (If no, proceed to Question 9)   If yes, please attach the following: Attached?
Copy of written Electrical Safety Program  
List of personnel designated as Competent under Electrical Safety Program   Verification of personnel training (copies of certs, cards, etc.)  

9. Is work that may have an arc flash potential anticipated in the scope of the work awarded? (If no, proceed to Question 10)  
Are all materials required to safely perform arc flash present?   If yes, please attach the following: Attached?
Copy of Arc Flash Procedure  
List of personnel designated as Competent under Arc Flash Program   Verification of personnel training (copies of certs, cards, etc.)   17 10. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 11)?  
If yes, please attach the following: Attached?
Copy of written Hearing Conservation Program  
List of personnel working in high noise areas  
Verification of personnel training (copies of certs, cards, etc.)  

11. Is work involving chemicals anticipated in the scope of the work awarded? (If no, proceed to Question 12)?  
* Copies of SDS for Chemicals used must be kept at jobsite Please attach the following: Attached?
Copy of written Hazard Communication Program  
List of personnel performing work with chemicals  
Verification of personnel training (copies of certs, cards, etc.)   List trade names of all hazardous materials which you will be using on site:

12. Is work on or adjacent to public roadways anticipated in the scope of the work awarded? (If no, proceed to Question 13)  
Do you have the appropriate provisions (signs, devices, barricades/)   Please attach the following: Attached?
Please provide a list of personnel working in traffic areas.   Verification of personnel training (copies of certs, cards, etc.)   NOTE: If awarded bid, more documentation may be required

13. Is it anticipated in the scope of the work awarded that exposure to asbestos is possible? (If no, proceed to Question 14)  
Please attach the following: Attached?
Copy of written procedure(s)  
List of personnel working with potential exposure to asbestos   Verification of personnel training (copies of certs, cards, etc.)   18 14. Is it anticipated in the scope of the work awarded that exposure to silica is possible? (i.e. sandblasting, concrete demolition, concrete saw cutting, surface grinding, etc.) (If no, proceed to Question 15)
 
Please attach the following: Attached?
Copy of Silica Control Plan  
List of personnel working with potential exposure to silica   Verification of personnel training (copies of certs, cards, etc.)  

15. Is work at heights anticipated in the scope of the work awarded? (If no, proceed to Question 16)   Please attach the following: Attached?
Copy of written Fall Protection Program  
List of personnel designated as Competent under Fall Protection Program   Verification of personnel training (copies of certs, cards, etc.)  

16. Is work requiring the use of respirators anticipated in the scope of the work awarded? (If no, proceed to Question 17)  
Please attach the following: Attached?
Copy of written Respiratory Protection Program  
List of personnel using respirators  
Verification of personnel training (copies of certs, cards, etc.)  

17. If the scope of work to be performed is not adequately represented by questions (1-16), please list any additional Health & Safety concerns below.

In addition to the previous sections, Contractors that have previously been awarded work by the City, will be equally evaluated on their compliance history in relation to City projects.

SECTION 6 – COMPLIANCE HISTORY ON CITY PROJECTS
19 I Certify under penalty of perjury that:
a. the information contained herein is true and correct to the best of my knowledge,and b. no attempt has been made to give false or misleading information or to withhold any information.

Signature of Authorized Representative: Title of Authorized Representative Printed Name of Authorized Representative Date Signed:

SECTION 7 – CERTIFICATION STATEMENT
20 Attachment C

NOTICE OF NON-COMPLIANCE
Project:

Contractor:

Notice of Non-Compliance was issued toContractor’s representative, , Name
on at .

The following unsafe behaviors were observed at the Contractor’s job site:

If the unsafe condition is not immediately corrected, the City of Redlands may take disciplinary action in accordance with the Contractor Safety Program guidelines. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ To be completed by Contractor
Corrective action plan to abate hazards:

Unsafe Condition Resolved: Date: Time:

Remarks:
21 Attachment D
Job Hazard Analysis
Project:

Company: Project Safety Official: Project Manager (City):

Scope of Work: Location: Date:

Tasks Potential Safety
Risks/Hazards
Safety
Controls/Mitigate
Required PPE
Hard Hat
Safety Vest
Safety Glasses/Goggles
Safety Boots
Respirator
Safety Gloves
Face Shield
Fall Protection
Other:

Signatures of Employees On-Site this JHA is applicable to:

Employee Signature: Print Name: Date:
22 Attachment E

INCIDENT INVESTIGATION FORM
Date of Incident: Time of Incident: Date Reported:

Lead Investigator: Contact Information:

Contractor: Employee Name:

Witness 1 Name: Telephone:

Witness 2 Name: Telephone:

Incident Site/ Location
Incident Summary:

Near Miss Yes No Incident Severity: Minor Significant Major Critical Root Cause(s):

Corrective Actions:

APPENDIX F

CULTURAL RESOURCES MANAGEMENT
Cultural Mitigation Measures:

1. In the event that cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period. Additionally, the Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN) shall be contacted, as detailed within TCR-1, regarding any pre-contact and/or historicera finds and be provided information after the archaeologist makes his/her initial assessment of the nature of the find, so as to provide Tribal input with regards to significance and treatment.

2. If significant pre-contact and/or historic-era cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to YSMN for review and comment, as detailed within TCR-1. The archaeologist shall monitor the remainder of the project and implement the Plan accordingly.

3. If human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the project.

Tribal Cultural Resource Mitigation Measures:

1. The Yuhaaviatam of San Manuel Nation Cultural Resources Management Department (YSMN) shall be contacted, as detailed in CR-1, of any pre-contact and/or historic-era cultural resources discovered during project implementation, and be provided information regarding the nature of the find, so as to provide Tribal input with regards to significance and treatment.

Should the find be deemed significant, as defined by CEQA (as amended, 2015), a Cultural Resources Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with YSMN, and all subsequent finds shall be subject to this Plan. This Plan shall allow for a monitor to be present that represents YSMN for the remainder of the project, should YSMN elect to place a monitor on-site.

2. Any and all archaeological/cultural documents created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to YSMN. The Lead Agency and/or applicant shall, in good faith, consult with YSMN throughout the life of the project.

APPENDIX G

EXAMPLE SUBMITTAL FOR EXISTING REINFORCED CONCRETE

BOX CULVERT (FOR REFERENCE ONLY)

THIS PAGE INTENTIONALLY LEFT BLANK

City Council AGENDA ITEM NO. J6.

DATE: July 21, 2026
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Public Works Construction Contract with B-81 Paving, Inc. for On-Call Pavement Repair Services for Water Utilities on an as-needed basis for an amount not to exceed $600,000, and determination that this action is exempt from environmental review pursuant to Section 15301 of the State's Guidelines implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Heredia)
MOTION:

If the City Council determines that staff recommendation is appropriate, the following motions are provided:

1. I move that the City Council determine approval of the Public Works Construction Contract with B-81 Paving, Inc. is exempt from environmental review pursuant to section 15301 of the State's guidelines implementing the California Environmental Quality Act, and

2. I move to approve a Public Works Construction Contract with B-81 Paving Inc. for On-Call Pavement Repair Services for Water Utilities on an as-needed basis for an amount not to exceed $300,000 for the fiscal year 2026/27, and $300,000 for the fiscal year 2027/28, totaling $600,000.

RECOMMENDATION:

Staff recommends that City Council determine approval of the Public Works Construction Contract with B-81 Paving, Inc. is exempt from environmental review pursuant to section 15301 of the State's guidelines implementing the California Environmental Quality Act; and approve a Public Works Construction Contract with B-81 Paving, Inc. for On-Call Pavement Repair Services for Water Utilities on an as-needed basis for an amount not to exceed $300,000 for the fiscal year 2026/27, and $300,000 for the fiscal year 2027/28, totaling $600,000.

DISCUSSION:

The Municipal Utilities and Engineering Department (MUED) annually performs approximately 250 repairs to water mains, service lines, valves, blow-offs, and other water utility infrastructure throughout the City’s water service area.

These repairs typically require asphalt removal and trench excavation. Following completion of the utility repair work, the trenches are temporarily restored with cold-mix asphalt until hot-mix asphalt is available for permanent restoration. Historically, permanent pavement restoration has been completed by contractors on an as-needed basis at the request of MUED staff. The On-Call Pavement Repair for Water Utilities Project was developed to establish a comprehensive contract with clearly defined specifications and estimated quantities, enabling a contractor to provide permanent asphalt patching services for all eligible water utility repairs under a single contract.

A Project bid notice was issued in May 2026, and seven (7) bids were received from the following contractors on June 4th, 2026:

BIDDER LOCATION UNIT PRICE BID ITEM 1
B-81 PAVING, INC. YUCAIPA, CA $16.72 per square foot
HARDY & HARPER, INC. LAKE FOREST, CA $21.00 per square foot GM SAGER CONSTRUCTION POMONA, CA $22.00 per square foot ONYX PAVING COMPANY YORBA LINDA, CA $23.67 per square foot PAVECO CONSTRUCTION BALDWIN PARK, CA $27.35 per square foot

ACCESS GENERAL CONTRACTING
INC
CORONA, CA $32.00 per square foot
BEN'S ASPHALT LLC. SANTA ANA, CA $55.00 per square foot Staff reviewed the bid submitted by B-81 Paving, Inc. and determined that it was accurate and that the company is the lowest responsive bidder in accordance with the project specifications.

Staff recommends that the City Council approve a Public Works Construction Contract with B-81 Paving, Inc. for On-Call Pavement Repair Services for Water Utilities on an as-needed basis in an amount not to exceed $300,000 for the fiscal year 2026/27, and $300,000 for the fiscal year 2027/28, totaling $600,000.

Approval of the Public Works Construction Contract with B-81 Paving, Inc. is exempt from environmental review pursuant to Section 15301 of the California Environmental Quality Act Guidelines, as the Project consists of the maintenance and repair of existing public streets and does not involve the expansion of existing facilities or an increase in capacity.

ALTERNATIVES:

City Council may deny the staff recommendation and provide an alternate direction.

STRATEGIC PLAN:

N/A
SUBMITTED BY:

Monica Heredia, Municipal Utilities and Engineering Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Danielle Garcia, Assistant City Manager
Goutam K. Dobey, City Engineer
PREPARED BY:

Bryan Arellano, Assistant Engineer

FISCAL IMPACT
Fiscal Year: FY 26/27
Budgeted Y/N: Yes
Account No.: 501900
Additional Appropriation Required: No
Discussion:

There is no additional fiscal impact associated with this action. Funding for these services is included in the FY 2026/27 and FY 2027/28 Water Service Fund budgets.

Attachments
A_Agreement_w_B-81_Paving.pdf
B_Bid_Report.pdf
C_Bid_Analysis.pdf
D_SCOPE_OF_WORK.pdf
1 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc

PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this 21st day of July, 2026, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and B-81 Paving Inc (hereinafter "Contractor").

City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: On-Call Pavement Repair Services for Water Utilities, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s On-Call Pavement Repair Services for Water Utilities (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum not-to-exceed Three Hundred Thousand dollars ($300,000.00) for fiscal year 2026/27; and the sum not to exceed Three Hundred Thousand dollars ($300,000.00) for fiscal year 2027/28; totaling an amount not to exceed Six Hundred Thousand dollars ($600,000.00) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within seven hundred (700) calendar days from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of Five Hundred dollars ($500.00) for each consecutive calendar day in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that Five Hundred dollars ($500.00) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of Three Hundred Seventy-Five Thousand dollars ($375,000.00) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public 2 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. 3 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)
By:____________________________________
Mario Saucedo, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
B-81 Paving, Inc.___________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.
4 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc

WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Municipal Utilities and Engineering Department
On-Call Pavement Repair Services for Water Utilities
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2026.

B-81 Paving, Inc.______________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.) 5 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc

FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and B-81 Paving, Inc. (hereinafter designated as "Principal") have entered into an agreement dated July 21, 2026 (“Agreement”), whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as On-Call Pavement Repair Services for Water Utilities and is hereby referred to and made a part hereof; and Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of Six Hundred Thousand dollars ($600,000.00) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the 6 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_______________________________
____
______________________________________
____
(Seal and Notarial Acknowledgment of
Surety)
Telephone( )_________________________
7 I:\cmo\Agreements\Agreement w B-81 Paving.bm.07.08.2026.FY2728-08.doc

LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and B-81 Paving, Inc. (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated July 21, 2026, and identified as On-Call Pavement Repair Services for Water Utilities is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Six Hundred Thousand dollars ($600,000.00) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of
Surety)
____________________________________
Telephone: ( )___________________

PROJECT NO. 20260604 BID DATE: 6//4/26
On-Call Pavement Repair Services for Water Utilities START DATE:

B-81 Paving Inc Hardy & Harper, Inc GM Sager
Construction CO, Inc
Unit Price Unit Price Unit Price
1 Sawcut R&R, Grind and Overlay R&R Asphalt Per Square Foot $ 16.72 $ 21.00 $ 22.00 2 Remove Existing Temporary Material Per Square Foot $ 51.99 $ 61.00 $ 100.00 3 Replace Pavement Striping in Kind Per Square Foot $ 15.00 $ 35.00 $ 100.00 4 Replace Thermoplastic Pavement Markings Each $ 185.00 $ 375.00 $ 1,200.00 5 Replace Traffic Loops Each $ 1,620.00 $ 1,500.00 $ 1,900.00 6 Replace Pavement Markers Each $ 65.00 $ 15.00 $ 25.00 License Status Active Active Active
Sub's License Status N/A N/A N/A
Bid Bond Company N/A N/A N/A
Submitted Entire Bid Package Yes Yes Yes
Submitted Sub's Qualification Statement N/A N/A N/A
DIR Status Active Active Active
Error in Bid No No No
Note: Bid to be awarded to lowest responsive and responsible bidder based on the unit price for bid item No. 1

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Unit of Measure
Bidder #1, #2, #3
PROJECT NO. 20260604 BID DATE: 6/4/2026
On-Call Pavement Repair Services for Water Utilities START DATE:

Onyx Paving
Company, Inc. Paveco Construction, Inc. Access General Contracting, Inc. Bens Asphalt LLC Unit Price Unit Price Unit Price Unit Price
1 Sawcut R&R, Grind and Overlay R&R Asphalt Per Square Foot $ 23.67 $ 27.35 $ 32.00 $ 55.00 2 Remove Existing Temporary Material Per Square Foot $ 88.00 $ 50.00 $ 55.00 $ 100.00 3 Replace Pavement Striping in Kind Per Square Foot $ 25.00 $ 25.00 $ 35.00 $ 300.00 4 Replace Thermoplastic Pavement Markings Each $ 2,250.00 $ 2,500.00 $ 750.00 $ 6,000.00 5 Replace Traffic Loops Each $ 2,000.00 $ 2,500.00 $ 5,000.00 $ 3,500.00 6 Replace Pavement Markers Each $ 500.00 $ 25.00 $ 15.00 $ 50.00

CITY OF REDLANDS

MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT

BID ANALYSIS
Item
No. Bid Item Unit of Measure
Bidder #4, #5, #6, #7

City Council AGENDA ITEM NO. J7.

DATE: July 21, 2026
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Public Works Construction Contract for the California Street Landfill Phase 5 Expansion project with Sukut Construction, LLC. in the amount of $5,095,919; waiver of minor irregularities contained within the bid received by Sukut Construction, LLC; and determination that the project is not subject to further environmental review pursuant to Section 15162 of the State's Guidelines implementing the California Environmental Quality Act (Facilities and Community Services Department Director Crocker)
MOTION:

If the City Council determines that staff's recommendation is appropriate, the following motions are provided:

1. I move to determine that the award of a construction contract to Sukut Construction, LLC for the California Street Landfill Phase 5 Expansion Project is not subject to further environmental review pursuant to Section 15162 of the State's Guidelines implementing the California Environmental Quality Act; and

2. I move to waive the minor irregularities contained within the bid submitted by Sukut Construction, LLC for the California Street Landfill Phase 5 Expansion Project because the contractor corrected a calculation error in the original submission and worked with City staff to reduce project costs; and

3. I move that the City Council approve plans and specifications, and award a construction contract to Sukut Construction, LLC for the California Street Landfill Phase 5 Expansion Project in the amount of $5,095,919.25.

RECOMMENDATION:

Staff recommends that City Council determine approval of a Public Works Construction Contract is categorically exempt from environmental review in accordance with Section 15162 of the State’s guidelines implementing the California Environmental Quality Act; staff further recommends Council waive the minor irregularities included in the bid from Sukut Construction, LLC, and award a construction contract to Sukut Construction, LLC for the California Street Landfill Phase 5 expansion project in an amount of $5,095,919.25.

DISCUSSION:

The California Street Landfill (Landfill) is required to maintain compliance with all applicable federal, state, and county regulations governing daily operations, environmental monitoring, and reporting requirements. The City’s permit to operate the Landfill is contained within the approved Joint Technical Document (JTD), which establishes the design criteria and operational requirements for the facility, including the phased expansion of disposal capacity over time. The Local Enforcement Agency (San Bernardino County) and the Santa Ana Regional Water Quality Control Board require that all landfill expansion activities proceed in accordance with the approved JTD. As each permitted phase reaches capacity, subsequent phases are constructed to ensure the continued operation of the Landfill in compliance with regulatory requirements.

Phase 5 of the Landfill will be developed in accordance with the JTD and applicable Construction Quality Assurance requirements. Phase 4 of the Landfill is projected to reach its interim disposal by early 2027. To ensure uninterrupted collections and landfill operations, staff has initiated the design, bidding, and construction process for Phase 5. The proposed Phase 5 expansion will provide approximately 750,000 cubic yards of additional disposal capacity, equivalent to approximately 450,300 tons of waste. Based on current disposal rates, Phase 5 is anticipated to provide approximately seven to eight years of operational capacity. Capacity projections are determined using established airspace utilization factors derived from land surveying and staking data, which are compared against annual tonnage records reported through the solid waste tracking system. The project specifications provide for a construction period of 210 working days.

Consistent with the City’s procurement policies, staff issued a Request for Bids (RFB) for the California Street Landfill Phase 5 Expansion Project (Project). On May 14, 2026, the City Clerk’s Office received and publicly opened one bid submission. Staff reviewed the bid for compliance with the RFB specifications, the City’s Purchasing Ordinance, and all applicable bidding requirements. Sukut Construction, LLC, was determined to be a responsible and responsive bidder, having satisfied all required specifications and procurement criteria.

Following the bid opening, staff received a revised bid proposal from Sukut Construction, LLC to correct a calculation error identified in the original submission. The revised proposal also reduced the overall project cost through value engineering measures and through an agreement with Mt. View Power (Southern California Edison), under which Southern California Edison will fund fifty percent (50%) of the costs associated with the double-lined liner system required for the acceptance of filter cake material at the Landfill. Pursuant to this agreement, Southern California Edison will contribute $1,402,092 toward the project. Accordingly, the total construction contract amount is $5,095,919, resulting in a net City cost of $3,693,827.

The proposed project is consistent with the environmental analysis contained in the previously certified Environmental Impact Report (EIR) adopted in May, 2002, for the California Street Landfill. Pursuant to Section 15162 of the California Environmental Quality Act (CEQA) Guidelines, no subsequent EIR is required unless substantial evidence demonstrates that one or more specified conditions exist. Staff evaluated the proposed Project and determined that the conditions requiring subsequent environmental review are not present, based on the following findings:

1. No substantial changes are proposed that would require major revisions to the previously certified EIR due to new significant environmental effects or a substantial increase in the severity of previously identified impacts.

2. No substantial changes have occurred in the circumstances under which the Project will be undertaken that would require major revisions to the previously certified EIR due to new significant environmental effects or a substantial increase in the severity of previously identified impacts.

3. No new information of substantial importance has become available that was not known, and could have been known, at the time the previous environmental documents were certified that would result in new significant impacts or a substantial increase in the severity of previously identified impacts. The previously certified EIR analyzed the environmental impacts associated with the expansion of the California Street Landfill for Phases 1 through 8.

Accordingly, staff has determined that the previously certified environmental documentation adequately addresses the Phase 5 Expansion Project and that, pursuant to State CEQA Guidelines Section 15162, no further environmental review is required.

ALTERNATIVES:

The City Council may wish to not approve the Public Works Contract and provide alternative direction to staff; however, this alternative may delay the completion of Phase 5 and impede collections and landfill operations.

STRATEGIC PLAN:

Supports Priority D- Sustainability.

SUBMITTED BY:

Tabitha Crocker, Facilities & Community Services Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Danielle Garcia, Assistant City Manager
PREPARED BY:

Marion Cronin, Administrative Analyst

FISCAL IMPACT
Fiscal Year: FY 2026-27
Revenue Generating: No
Amount: $5,095,919.25
Budgeted Y/N: Yes
Account No.: 511910-8501
Additional Appropriation Required: No
Discussion:

Sufficient funding for this project is included in the Solid Waste Division's project budget for Fiscal Year 2026-27 as approved by City Council.

Attachments
A_Agreement_w_Sukut_Construction.pdf
B_Sukut_Construction_Proposal.pdf
C_City_Request_for_Bid_-_CSL_Phase_5_Expansion.pdf
D_City_Bid_Report_-_CSL_Phase_5_Expansion.pdf
I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc

PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this 21st day of July, 2026, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and Sukut Construction, LLC (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:

1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: California Street Landfill Phase 5 Expansion, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s California Street Landfill Phase 5 Expansion Project (the “Work”).

2. CONTRACT SUM: City shall pay Contractor the sum of Five Million Ninety-Five Thousand Nine Hundred Nineteen Dollars and Twenty-Five Cents ($5,095,919.25) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.

3. TIME FOR COMPLETION: The Work shall be completed within two hundred ten (210) working days from and after the date of City’s issuance of a Notice to Proceed to Contractor.

4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each working day as defined in Section 1-2 of the Standard Specifications for Public Works Construction “Greenbook” in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.

5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).

6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.

7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy-five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.

8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.

9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.

10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.

11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.

I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.

CITY OF REDLANDS
(SEAL)
By:____________________________________
Mario Saucedo, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
__________________________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.

I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc

WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Facilities and Community Services Department
California Street Landfill Phase 5 Expansion Project
Project No. FCS02172026NA
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.

CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.

I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.

Dated this day of , 2026.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc

FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and Sukut Construction, LLC. (hereinafter designated as "Principal"), have entered into an agreement dated July 21, 2026 (“Agreement”), whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as California Street Landfill Phase 5 Expansion Project No. FCS02172026NA and is hereby referred to and made a part hereof; and Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of Five Million Ninety-Five Thousand Nine Hundred Nineteen Dollars and Twenty-Five Cents ($5,095,919.25) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.

As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.

Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:

1. Complete the Work in accordance with its terms and conditions; or

2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.

No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.

The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.

In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________
I:\cmo\Agreements\Agreement w Sukut Construction.bm.07.09.2026.FY2728-12.doc

LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and Sukut Construction, LLC. (hereinafter designated as “Principal”), have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated July 21, 2026, and identified as California Street Landfill Phase 5 Expansion Project, Project No. FCS02172026NA is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commencing the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.

Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Five Million Ninety-Five Thousand Nine Hundred Nineteen Dollars and Twenty-Five Cents ($5,095,919.25) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.

In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2026.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________
Item Price Summary
Project Name: California Street LF Ph 5 Expansion Project Customer: City Of Redlands Job Number: Bid Number: 26-062 Billing Address: 35 Cajon Street, Suite 4 Bid As: Prime Redlands, CA 92373
Estimator: Tom Wadden Phone: (909) 798-7535
Project Address: Contact:

Completion Date:

Pay Items
Description Job Cost ID Task JCID Bid Quantity UM Unit Bid Price Total Bid Price 1 - MOBILIZATION (5% Cap) 1.00 LS $255,000.15 $255,000.15 2 - EXCAVATION/STOCKPILING/PROCESSING 79,035.00 CY $6.20 $490,017.00 3 - ENGINEERED FILL 6,868.00 CY $10.00 $68,680.00
4 - LOW PERMEABILITY SOIL LAYER 9,466.00 CY $61.50 $582,159.00 5 - GEOSYNTHETIC SUBGRADE PREPARATION 255,577.00 SF $0.70 $178,903.90 6 - 40-MIL DOUBLE-SIDED TEXTURED HDPE

GEOMENBRANE LINER
532,553.00 SF $0.95 $505,925.35
7 - GEOSYNTHETIC CLAY LINER (GCL) 532,553.00 SF $1.30 $692,318.90 8 - 60-MIL DOUBLE-SIDED TEXTURED HDPE

GEOMENBRANE LINER
488,111.00 SF $1.25 $610,138.75
9 - 60-MIL SINGLE-SIDED TEXTURED HDPE

GEOMEMBRANE LINER
44,442.00 SF $1.80 $79,995.60
10A - DOUBLE-SIDED GEOCOMPOSITE 266,276.00 SF $0.75 $199,707.00 10B - 40-MIL DOUBLE-SIDED LEAK DETECTION

GEOCOMPOSITE
266,276.00 SF $1.25 $332,845.00
11 - OPERATIONS LAYER 17,464.00 CY $20.00 $349,280.00
12 - 4 INCH DIAMETER HDPE LATERAL PIPE
(SOLID)

8.00 LF $350.00 $2,800.00
13 - 4 INCH DIAMETER HDPE LATERAL PIPE
(PERFORATED)
1,020.00 LF $47.00 $47,940.00
14 - 8 INCH DIAMETER HDPE HEADER PIPE
(SOLID)

8.00 LF $355.00 $2,840.00
15 - 8 INCH DIAMETER HDPE HEADER PIPE
(PERFORATED)
298.00 LF $70.00 $20,860.00
16 - LCRS DRAINAGE GRAVEL 1,538.00 CY $135.00 $207,630.00 17 - 8 OZ. NON-WOVEN LCRS GEOTEXTILE 23,070.00 SF $0.50 $11,535.00 18 - PHASE 4 TO PHASE 5 FLOOR LINER TIE-IN 741.00 LF $81.00 $60,021.00 19 - PHASE 4 TO PHASE 5 SIDE SLOPE LINER
TIE-IN
162.00 LF $81.00 $13,122.00
20 - CREST ANCHOR TRENCH (SOUTHERN &

NORTHERN)
571.00 LF $63.00 $35,973.00
21 - SIDE SLOPE LINER TERMINATION &

ANCHOR TRENCH
106.00 LF $55.00 $5,830.00
5/20/2026 1:46:11 PM Page 1 of 2
$252,962.67 $346,159.45 $305,069.37 $39,997.80 $99,853.50 $166,422.50 Description Job Cost ID Task JCID Bid Quantity UM Unit Bid Price Total Bid Price 22 - FLOOR LINER TERMINATION 758.00 LF $58.00 $43,964.00 23 - SURVEYING 1.00 LS $96,000.00 $96,000.00
26 - GEOMEMBRANE LEAK DETECTION TESTING

SUPPORT

1.00 LS $115,000.00 $115,000.00
27 - OVER-EXCAVATE MONITORING WELL B-5B

DECOMMISSION

1.00 LS $5,500.00 $5,500.00
28 - LLDPE GEOMEMBRANE COVER AND

BALLAST SYSTEM
39,016.00 SF $2.10 $81,933.60
Pay Items Total: $5,095,919.25
5/20/2026 1:46:11 PM California Street LF Ph 5 Expansion Project Page 2 of 2 SCE Total Cost to Cover $1,308,932.09
$40,966.80 $57,500.00
- $1,308,932.09
$3,786,987.16

CITY OF REDLANDS

FACILITIES & COMMUNITY SERVICES
Bid Proposal, Contract Documents and Specifications
For
CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT
FCS02172026NA
Bid Due Date:

Thursday, May 14th, 2026
11:00 A.M. pst
APRIL 2026

THIS PAGE INTENTIONALLY LEFT BLANK
California Street Landfill Phase 5 Expansion – FCS02172026NA

CITY OF REDLANDS

FACILITIES AND COMMUNITY SERVICES
Bid Proposal, Contract Documents and Specifications
for
CALIFORNIA STREET LANDFILL – PHASE 5

EXPANSION PROJECT
Project No. FCS02172026NA
For use in conjunction with specifications entitled: “Standard Specifications for Public Works Construction (Greenbook)” 2021 Edition; “Standard Plans for Public Works Construction” 2021 Edition; Municipal Utilities and Engineering Department’s Water Systems Standard Specifications and Sanitary Sewer System Standard Specifications, latest editions; and General Permit Conditions and Trench Specifications.

City Council:

Mario Saucedo, Mayor
Marc Shaw, Mayor Pro Tem
Paul Barich, Council member
Denise Davis, Council member
Eddie Tejeda, Council member
City Clerk:

Jeanne Donaldson, City Clerk
City Staff:

Charles Duggan, City Manager
April 2026
California Street Landfill Phase 5 Expansion – FCS02172026NA

CALENDAR OF EVENTS /REQUEST FOR BID TIMELINE
Listed below are the important dates and times by which the actions noted must be completed.

All dates are subject to change by the Purchasing Manager. If the Purchasing Division finds it necessary to change any of these dates or times prior to the bid due date, the change will be accomplished by addendum.

ACTION COMPLETION DATE
Issue RFB Tuesday, April 14th, 2026
Pre-Bid Conference and Job Walk
Location: California Street Landfill.
2151 Nevada Ave
Redlands CA 92373
Wednesday, April 22
nd, 2026 at 9:00 A.M.

Last Day for Questions Thursday, April 30th, 2026
@ 2:00 P.M.

Response to questions posted Thursday, May 7th, 2026
Bid Response Due Date Thursday, May 14th, 2026 at 11:00 A.M.

Bid Opening Date
Location: City Clerk’s Office
35 Cajon St.

Ste. 4, Redlands, CA 92373
Thursday, May 14th, 2026 at 11:00 A.M.

Tentative Contract Award To Be Determined
California Street Landfill Phase 5 Expansion – FCS02172026NA CALIFORNIA STREET LANDFILL – PHASE 5 EXPANSION PROJECT
Project No. FCS02172026NA

TABLE OF CONTENTS
PAGE
NOTICE INVITING SEALED PROPOSALS (BIDS) NIB 1

BID DOCUMENTS
Instructions to Bidders BD 1
Proposals BD 1
Agreement and Bonds BD 2
Withdrawal of Bids BD 2
Insurance and Hold Harmless Requirements BD 2
Licenses and Permits BD 6
Substitution of Securities BD 6
Subcontractors BD 6
Non Debarred Contractors and Subcontractors BD 7
Proposal BD 10
Bid Schedule BD 10
Addenda BD 25
Bid Certification BD 26
Bid Bond BD 27
Statement by Bidder - Non-Collusion Affidavit BD 28
Statement by Bidder - Officers of Corporation BD 29
Statement by Bidder - Subcontractors List BD 30
Statement by Bidder – Material Manufacturers/Suppliers List BD 31 Statement by Bidder - Qualification and Experience Statement BD 32 Statement by Bidder - General Information BD 37

CONTRACT DOCUMENTS
Contract CD 1
Worker's Compensation Insurance Certification CD 3
Performance Bond CD 4
Labor and Material Bond CD 6

GENERAL CONDITIONS
Section 1 Terms, Definitions, Abbreviations, and Symbols GC 1 Section 2 Scope and Control of Work GC 2
Section 3 Changes in Work GC 2
Section 4 Control of Materials GC 2
Section 5 Utilities GC 3
Section 6 Prosecution, Progress and Acceptance of the Work GC 3 Section 7 Responsibilities of the Contractor GC 6
Section 8 Facilities for Agency Personnel GC 17
Section 9 Measurement and Payment GC 17
Section 10 Assignment of Unfair Business Practices Claims GC 19 Section 11 Trenching and Excavation GC 12
Section 12 Removal, Relocation or Protection of Existing Utilities GC 13

SPECIAL CONDITIONS
Section 1 Scope of Work SC 1
Section 2 Work Site SC 1
Section 3 Contract Drawings SC 1
Section 4 Time of Completion SC 2
Section 5 Working Days and Working Hours SC 2
Section 6 Construction Staking SC 2
Section 7 Specifications and Drawings Furnished to Contractor SC 3 Section 8 Utilities SC 3
Section 9 Scheduling and Order of Work SC 3
Section 10 Shop Drawings SC 3
Section 11 Preconstruction and Progress Meetings SC 5
Section 12 Safety SC 5
Section 13 Examination of Plans, Specifications and Site of Work SC 5 Section 14 Permits, Certificates, Laws, and Ordinances SC 5 Section 15 As Built Drawings SC 5
Section 16 Compliance with Contract Drawings SC 5
Section 17 Preservation of Paved Surfaces, Environmental Factors Restoration of SC 6 Work Sites, and Disposal of Spill and Waste Material
Section 18 Maintenance and Guarantee SC 6

SPECIAL PROVISIONS
(Standard Specifications for Public Works Construction, 2012 Edition) Section 1.1 Intent SP 1
Section 1.2 Clearing and Grubbing SP 1
Section 1.3 Trench Excavation SP 1
Section 1.4 Bedding SP 2
Section 1.5 Backfill SP 2
Section 1.6 Compaction Test SP 2
Section 1.7 Pavement and Base Replacement SP 2
Section 1.8 Pavement Striping SP 3
Section 1.9 Drainage Control SP 3
Section 1.10 Traffic Control SP 3

TECHNICAL SPECIFICATIONS
(Construction Specifications Institute)
DIVISION 1A – CITY GENERAL REQUIREMENTS
Section 01110 Coordination of work
Section 01112 Description of work
Section 01200 Measurement and Payment
Section 01251 Change Order Requests
Section 01254 Change Orders
Section 01298 Schedule of Values
Section 01321 Construction Schedule
Section 01322 Construction Progress Photography
Section 01323 Construction Status Reports
Section 01330 Submittals
Section 01571 Stormwater Pollution Prevention Plan
Section 01581 Construction Information Signs
Section 01721 Mobilization
Section 01722 Surveying
Section 01732 Potholing
Section 01740 Demobilization
DIVISION 1 - GENERAL REQUIREMENTS
Section 01010 Summary of Work
Section 01019 Contract Considerations
Section 01025 Measurement and Payment
Section 01035 Modification Procedures
Section 01050 Field Engineering
Section 01052 Layout of Work and Surveys
Section 01200 Project Meetings
Section 01300 Submittals
Section 01310 Construction Schedule
Section 01400 Quality Control
Section 01500 Construction Facilities
Section 01560 Temporary Controls
Section 01600 Material and Equipment
Section 01630 Product Options and Substitutions
Section 01700 Contract Closeout
DIVISION 2 – SITE WORK
Section 02110 Clearing, Grubbing and Stripping
Section 02169 Protective Plywood Cover
Section 02219 Stockpiling and Soil Management
Section 02221 Excavating
Section 02222 Anchor Trench Backfill
Section 02225 Geomembrane Subgrade Prep
Section 02227 LCRS Drainage Gravel
Section 02228 Engineered Fill
Section 02229 Operations Layer
Section 02250 Low-Permeability Soil Layer
Section 02270 Erosion and Sediment Control
Section 02710 Polyethylene Pipe
Section 02771 Geotextile
Section 02774 Drainage Geocomposite
Section 02778 HDPE Geomembrane
Section 02779 Fabric-Encased Geosynthetic Clay Liner
Section 02780 Geomembrane Leak Detection Testing
Section 02781 LLDPE Geomembrane Cover and Ballast System

ATTACHMENTS

A – Construction Quality Assurance Plan
B – Technical Specifications
C – Construction Drawings
D – Contractor Safety Program

NOTICE INVITING SEALED BIDS

FOR THE
CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION
PROJECT NUMBER: FCS02172026NA
NOTICE IS HEREBY GIVEN that the City Council of the City of Redlands invites all and will receive sealed Bids at the office of the City Clerk, City of Redlands, 35 Cajon Street, Suite 4, Redlands, CA 92373, up to the hour of 11:00 a.m., May 14th, 2026 at which time they will be opened and publicly read. Bids shall be marked: CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION – FCS02172026NA.

The City Council of the City of Redlands reserves the right to reject any and all Bids, to waive any irregularity, and award contracts in the best interests of the City.

The City of Redlands is currently using Planet Bids, a web based bid management service to manage request for bids. Planet Bids does not charge a fee to access and view current project “Request for Bids”, however, Planet Bids requires potential contractors, subcontractors, and suppliers to provide contact information in order to download files, receive addendum notifications and to receive automatic updates or revisions to projects. Planet Bids can be accessed through the City of Redlands website at https://www.redlands.gov/purchasing-vendorresources/.

For potential bidders that do not have the ability to access Planet Bids, bid packages can be obtained at the office of the Facilities and Community Services, Civic Center, 35 Cajon Street, Suite 222, Redlands, California 92373.

Proposals (Bids) shall be executed on the separately bound forms included within the "Bid Submittal Package" in accordance with the instructions contained therein.

Bid security, in the form of a cashier’s check, a certified check made to the order of the City of Redlands, or a Bidder's Bond, and in an amount not less than ten percent (10%) of the amount of the Bid is required to be submitted with each Bid. Said check or said bond shall be given as a guarantee that the bidder will enter into contract with the City of Redlands if awarded the work, and will be declared forfeited if the said bidder fails to enter into contract within sixty (60) days after Notice of Award.

The Bidder to whom award is made will be required to furnish a Labor and Material Bond and a Faithful Performance Bond in an amount of 100% of the Bid amount, from a Surety Company satisfactory to the City of Redlands.

NIB-1
Pursuant to Section 1770, et seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available on the internet http://www.dir.ca.gov/OPRL/PWD/index.htm for State Wages and at http://www.wdol.gov/dba.aspx for Federal Wages. Copies will be made available to any interested party on request. Pursuant to provisions of Section 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the City to ensure performance of the work.

Pursuant to the provisions of Section 3300 of the California Public Contract Code, Bidders shall be licensed as “Class A”, and provide its California State Contractor’s License number to the City.

All terms and conditions contained in the Contract Documents including the Instructions to Bidders shall become a part of the Contract. No Bidder may withdraw their Bid for a period of sixty (60) days after the time of Bid Opening.

The Non-Mandatory Pre-Bid Conference and Job Walk will be held on Wednesday, April 22nd, 2026 at 9:00 a.m. The location for the bidder's conference is located at the California Street Landfill jobsite location at 2151 Nevada Street, Redlands, CA 92373.

No contractor or subcontractor may be listed on a bid proposal for a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to labor code section 1725.5.

All questions related to this project shall be asked through Planetbids via Q&A tab. It shall be understood, however, that no specification interpretations will be made by telephone or email, nor will any products be considered for approval prior to award of the Contract. Changes, if any, will be made by addendum prior to opening of Bids.

BY ORDER OF THE CITY COUNCIL OF THE CITY OF REDLANDS, SAN BERNARDINO

COUNTY, CALIFORNIA
Dated this 14th of April 2026
________________________________
/s/ City Clerk, City of Redlands
San Bernardino County, California
NIB-2

BID DOCUMENTS

THIS PAGE INTENTIONALLY LEFT BLANK
California Street Landfill Phase 5 Expansion Project FCS02172026NA

INSTRUCTIONS TO BIDDERS
For
CALIFORNIA STREET LANDFILL – PHASE 5 EXPANSION PROJECT
Project No. FCS02172026NA
Bids to receive consideration shall be made in accordance with the following instructions:

1. BIDS:
a. Bids shall be made upon the form of proposal furnished by the City. No additional or appended pages shall be accepted. All Bids shall be properly executed with all items filled in; the signatures of all persons signing shall be in longhand. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price in words shall be considered as representing the Bidder's intention, and the totals will be corrected by the Engineer to conform thereto. b. Bids may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete Bids, erasures, or irregularities of any kind. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder. c. Bids shall be accompanied by a cashier's or a certified check or Bidder's admitted corporate surety bond, in an amount not less than ten percent (10%) of the bid, made payable to the City of Redlands. Said check or bond shall be given as a guarantee that the Bidder will enter into a contract if awarded the work, and in case of refusal or failure to enter into said Contract, within fourteen (14) days after Notice of Award by the City in writing, the security shall be applied by the City to the difference between such bid and next lowest bid acceptable and surplus, if any, shall be returned to Bidder if cash or check is used, or to Surety if bid bond is used.
d. Before submitting a bid, Bidders shall carefully examine the Plans; read the Specifications; read all other Contract documents; shall fully inform themselves as to all existing conditions and limitations; and include in the bid a sum to cover the cost of all items included in the Contract. No allowance will be made due to lack of examination or knowledge. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered as to character, quality and scope of work to be performed; the quantities of materials to be furnished; and as to the requirements of the Bid Proposal, plans and specifications.
e. Pursuant to Labor Code section 1770 et seq. of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations and the United States Secretary of Labor, whichever rate is higher. Copies of such prevailing wage rates are available on the internet at www.dir.ca.gov/OPRL/PWD/index.htm for State wages and www.wdol.gov/dba/aspx for Federal Wages. Copies of the wage determinations are also available on file at the office of the Municipal Utilities & Engineering Department, City of Redlands, 35 Cajon Street, Suite 15A, Redlands CA 92373 and will be made available to any interested party upon request.

BD-1
California Street Landfill Phase 5 Expansion Project FCS02172026NA f. The bid must be submitted on or before the date and time specified in the Notice Inviting Sealed Proposals (Bids). The bid shall be submitted in a sealed envelope marked in the lower left corner as follows:

BID FOR: CALIFORNIA STREET LANDFILL – PHASE 5 EXPANSION PROJECT Project No. FCS02172026NA
g. Bids will be opened and publicly read aloud at the time set in the Notice Inviting Sealed Proposals (Bids), in the Office of the City Clerk, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.

2. AGREEMENT AND BONDS:

The form of Contract which the successful Bidder, as Contractor will be required to execute is included in the Contract documents and should be carefully examined by the Bidder. The Agreement, admitted Corporate Surety Bonds and other documents to be executed by the Contractor shall be executed in original-duplicates stamped according to law, one of which original-duplicates shall be filed with the City Clerk of the City of Redlands. The successful Bidder, simultaneously with the execution of the Agreement, will be required to furnish a faithful performance bond and a labor and material bond, in an amount equal to one hundred percent (100%) of the Contract price. Said bonds shall provide that if the Contractor or their Subcontractor fails to pay for any materials, provision, provender or other supplies or items used in, upon, for or about the performance of the work contracted to be done, or for any work of labor thereon of any kind, or for amounts due under the Unemployment Insurance Act or Workman's Compensation, with respect to such work or labor, that the surety or sureties will pay for the same. The amount shall not exceed the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. All bonds shall be secured from surety companies satisfactory to the City of Redlands and whose name is on file with the County Clerk of San Bernardino County, as an approved and financially sound surety company authorized to transact business in this state.

3. WITHDRAWAL OF BIDS:
a. Any Bidder may withdraw his Bid, only by written request, at any time prior to the scheduled time for Bid Opening.
b. No Bidder may withdraw his/her bid for a period of sixty (60) days after the time of Bid opening except as allowed by the California Public Contract Code.

4. INSURANCE AND HOLD HARMLESS REQUIREMENTS:

Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract. Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, BD-2
California Street Landfill Phase 5 Expansion Project FCS02172026NA giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective. The coverage shall provide the following minimum limits based on the type of work proposed under this Contract.

The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Insurance Requirements as follows:

TIER 1 DESIGNATED INSURANCEREQUIREMENTS
➢ Commercial General Liability
▪ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work isrequired
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission
➢ Business Auto Liability
▪ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission
BD-3
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits and
Conduit Construction (streets) Grading of Land Street Cleaning Caisson or Cofferdam Work Hazardous Materials Contractors Street or Road Construction Dam or Reservoir Construction Irrigation or Drainage Construction Tank Construction, Installation, Erection or Repair
Demolition (structures)
Landscape Construction (street or street
medians)
Telephone or Cable Line
Construction
Drilling
Painting (exterior greater than single
story)
Tree Pruning, Dusting,
Spraying or Removal
California Street Landfill Phase 5 Expansion Project FCS02172026NA ▪ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948Endorsements.
➢ Commercial Umbrella/ Excess Liability
▪ $5 Million Per Occurrence/ Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission
d. Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ▪ Waiver of Subrogation in favor of City
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission
e. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC)
Systems (service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors TIER 2 DESIGNATED INSURANCEREQUIREMENTS
a. Commercial General Liability
➢ $1 Million Per Occurrence/ $2 Million Aggregate
▪ City listed as an Additional Insured on the coverage
▪ Coverage is primary and non-contributory
▪ If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work isrequired
▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission BD-4
California Street Landfill Phase 5 Expansion Project FCS02172026NA b. Business Auto Liability
➢ $1 Million Combined Single Limit
▪ City listed as an Additional Insured on the coverage
▪ Must include liability arising from all owned, leased, hired, and non-owned autos ▪ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission.
➢ If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948Endorsements.
c.Workers Compensation
➢ $1 Million Per Occurrence for Bodily Injury by Accident ➢ $1 Million Each Employee for Bodily Injury by Disease ➢ $1 Million Policy Limit for Bodily Injury by Accident ➢ Waiver of Subrogation in favor of City
➢ If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission
d. Pollution Policy (Hazardous Materials) [If Applicable] ➢ Required of Projects that involve Demolition and/or Excavation Activities ➢ $1 Million Per Occurrence/ $2 Million Aggregate
➢ City listed as an Additional Insured on the coverage
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.

Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies orshall furnish separate certificates and endorsements from each subcontractor.

The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.

The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given. The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and theCity.

Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend BD-5
California Street Landfill Phase 5 Expansion Project FCS02172026NA City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.

5. LICENSES AND PERMITS:

No bid will be accepted from a Contractor who is not licensed in accordance with the law under the provisions of Division III, Chapter 9 of the Business and Professions Code of the State of California.

The Contractor shall, at the time of bid opening, possess a valid “Class A" Contractor's license, and provide its California State Contractor’s License number and DIR number to the City.

No contractor or subcontractor may be listed on a bid proposal for a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to labor code section 1725.5.

The Contractor shall, prior to Notice to Proceed, procure all other permits and licenses as stipulated in the GENERAL CONDITIONS.

6. SUBSTITUTION OF SECURITIES:

In accordance with applicable provisions of State law, the Contractor will be permitted to substitute qualified securities in lieu of retention of withheld progress payments by the Owner.

7. SUBCONTRACTORS:

Pursuant to Section 4105 of the California Public Contract Code, the bidder may not circumvent the requirement to list subcontractors by the device of listing one subcontractor, who in turn sublets portions constituting a majority of the work covered by the contract.

A. Pursuant to California Government Code section 4106, subcontractors who will perform work or labor or render services in an amount in excess of one-half of one percent of the Contractor’s total bid shall be set forth in a list of subcontractors within the bid documents. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual, or entity if requested by City. If the City or engineer, after doing an investigation, has reasonable objection to any proposed subcontractor, supplier, individual, or entity, the City may, before the notice of award is given, request the apparent successful bidder to submit a substitute, without an increase in the bid.

B. If the apparent successful bidder declines to make any such substitution, City may award the contract to the next lowest bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities declining to make the request and substitutions will not constitute grounds for forfeiture of the bid security of any bidder. Any subcontractor, supplier, individual or entity so listed and against which City makes no written objection prior to the giving of the notice of award will be deemed successful by City subject to verification of such assessments after the effective date of the agreement as provided herein.

BD-6
California Street Landfill Phase 5 Expansion Project FCS02172026NA

8. NON DEBARRED CONTRACTORS AND SUBCONTRACTORS
The Contractor and all of its subcontractors shall, at the time of bid opening and for performance of this public works contract, be non-debarred Contractors and not be ineligible Contractors pursuant to Public Contract Code section 6109 and Labor Code sections 1777.1 and 1777.7.

9. LABOR LAW REQUIREMENTS
Prior to the start of construction, the Contractor and each subcontractor shall submit to the City an executed Checklist of Labor Law Requirements, included within Appendix A, certifying that each Contractor and Subcontractor will comply with the foregoing Labor Law requirements; and fully understands that failure to comply with these requirements will subject it to the penalties cited herein.

By submitting a bid, the prime contractor and subcontractors involved in this project assure that they intend to comply with the labor law requirements noted within Appendix A, fully understanding that failure to comply may subject them to penalties as noted.

10. PLANS AND DRAWINGS
Attachment A – Construction Quality Assurance Plan
Attachment B – Technical Specifications
Attachment C – Construction Drawings
Attachment D – Contractor Safety Plan

12. TIME OF COMPLETION
The time of completion for all work under this Contract shall be Two Hundred and ten (210) Calendar Days from the date of the Notice to Proceed.

13. WORKSITE
California Street Landfill, 2151 Nevada Street, Redlands, CA 92373

14. WORKING DAYS AND WORKING HOURS

1. Working days are five days a week, (Monday through Friday) excluding City recognized holidays. A City of Redlands Construction Workday Calendar is included in the Appendix A.

2. Deviation from normal working days or working hours will not be allowed without the prior written consent of the Project Manager. If the Contractor is forced to work outside the normal working hours due to his negligence, or as directed by the Project Manager as a matter of public safety or to insure the quality of the work, project administration fee will be levied against the Contractor at the rate of $50 per hour, for a minimum of 4.0 hours, including travel time where applicable, except when the work is an uninterrupted continuation of a regular working day, in which case a minimum of 1.0 hour charge will be imposed.

3. Nothing in this section shall be construed as an authorization to the Contractor to perform any work outside the normal working days or working hours, and/or perform such work without the presence of an authorized City representative.

BD-7
California Street Landfill Phase 5 Expansion Project FCS02172026NA

15. CERTIFIED PAYROLL RECORDS
Pursuant to Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records which reflect the name, address, social security number, work classification of each employee; the straight time and overtime hours worked each day and each week; the fringe benefits; and the actual per diem wages paid to each journeyperson, apprentice, worker, or other employee hired in connection with a public works project.

Contractors and subcontractors shall maintain their certified payrolls on a weekly basis and shall submit said payrolls to the City of Redlands Representative at least monthly or within 7 days upon request. In the event that there has been no work performed during a given week, the Certified Payroll Record shall be annotated "No Work" for that week.

16. SAFETY
See Exhibit “D” for Contractor Safety Program Requirements and Submittals

17. UNDOCUMENTED WORKERS
Contractors and subcontractors are federally prohibited against hiring undocumented workers and are under requirement to secure proof of eligibility/citizenship from all workers.

18. BID PROTEST PROCEDURES
Bid Protest. Any bid protest must be in writing and received by the City Clerk’s Office at 35 Cajon Street, Suite 4, Redlands, CA 92373, before 5:00 p.m. no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:

18.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest.

If required by City, the protesting bidder must submit a non-refundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section, a “working day” means a day that City is open for normal business, and excludes weekends and holidays as observed by the City.

18.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.

18.3 Copy to Protested Bidder. A copy of the protest and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending on the outcome of the protest.

18.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk’s Office before 5:00 p.m., within two working days after the Bid Protest deadline or after actual receipt of the bid protest, whichever is sooner (The “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person representing the protested bidder if different from the protested bidder.

BD-8
California Street Landfill Phase 5 Expansion Project FCS02172026NA

18.5 Copy of Protesting Bidder. A copy of the response and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

18.6 Exclusive Remedy. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedure will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

18.7 Right to Award. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the Contract notwithstanding any pending or continuing challenge to its determination.

THE BIDDER'S EXECUTION ON THE SIGNATURE PORTIONS OF THIS

PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION

OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS PROPOSAL BD-9
California Street Landfill Phase 5 Expansion Project FCS02172026NA

PROPOSAL
TO: THE CITY OF REDLANDS, SAN BERNARDINO COUNTY, CALIFORNIA herein called the “City”.

Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract, and complete in a workmanlike manner, all of the work covered by the contract in connection with the City’s Project identified as:

CALIFORNIA STREET LANDFILL
PHASE 5 EXPANSION - PROJECT NO. FCS02172026NA
NOTE: Bidders must bid each item in this schedule. All entries in the entire BID DOCUMENT must be made clearly and in ink. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the bidder.

BID SCHEDULE

CALIFORNIA STREET LANDFILL
PHASE 5 EXPANSION - PROJECT NO. FCS02172026NA
BASE BID 1

MOBILIZATION
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
1 Includes all costs for mobilizing/demobilizing
equipment, site cleaning, living expenses, bonds,
insurance, office and field overhead, geosynthetic
installer management, labor, materials, tools,
equipment and all incidentals/administrative costs
necessary to complete work. Not to exceed 5% of
total contract value.
1 Lump
Sum $_________________
*"A" x "B" = "C" $_________________
BD-10
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 2

EXCAVATION/STOCKPILING/PROCESSING
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
2 Clear, grub, strip, excavate, haul, process and
place soil in the soil stockpile or in the areas
requiring engineered fill within and around the
cell area as described in the Specifications and
as shown on the Construction Drawings. Unit
cost for this item shall also include disposal of
unsuitable material that may be generated
during the clearing, grubbing and stripping
work and include all labor, materials, tools,
equipment and incidentals in the unit price
79,035
CY $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 3

ENGINEERED FILL
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
3 Equipment, labor, surveying, materials, tools,
moisture condition, place and compact as
engineered fill
6,868 CY $___________ $_________________
*"A" x "B" = "C" $_________________
BD-11
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 4

LOW PERMEABILITY SOIL LAYER
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
4 Equipment, labor & materials to process the low
permeability soil including obtaining on-site
soils, procuring sodium Bentonite, admixing the
on-site soils with Bentonite, transporting the
admix material to the Phase 5 area and placing,
moisture conditioning and compacting the low
permeability soil material within the test pad
and Phase 5 liner limits to result in a compacted
low permeability soil liner meeting the
requirements of the Technical Specifications.

Alternatively, low permeability soil may be
imported from an approved off-site source.

Costs for construction of the low permeability
soil material test pad shall be included within
this bid item. All anchor trenches, terminations
and tie-ins with existing liner system will be
considered incidental to the low permeability
soil layer construction.
9,466 CY $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 5

GEOSYNTHETIC SUBGRADE PREPARATION
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
5 Equipment, labor and materials to complete,
maintain and smooth-drum roll the compacted
low permeability soil layer surface prior to
placement of the secondary liner elements.
255,577
CY $___________ $_________________
*"A" x "B" = "C" $_________________
BD-12
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 6
40-MIL DOUBLE-SIDED TEXTURED HDPE GEOMENBRANE LINER
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
6 Equipment, labor and materials to complete
install primary and secondary vapor barrier
including but not limited to source quality
control, installing, seaming, temporary and
permanent anchoring (excluding excavation and
backfill of anchor trench) material for seam
overlays anchor trench and rub sheets, quality
control testing (destructive and nondestructive),
repairing, repairing all liner leaks identified by
geoelectric survey and marked for repair, and
all documentation required to complete the
work consistent with the Construction Drawings
and Technical Specifications
532,553
SF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 7

GEOSYNTHETIC CLAY LINER (GCL)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
7 Equipment, labor and materials to install
primary and secondary liner GCL including but
not limited to source quality control, installing,
seaming, temporary and permanent anchoring
(excluding associated excavation and backfill of
anchor trench), quality control testing, repairing
and all documentation required to complete and
document the work consistent with the
Construction Drawings and Technical
Specifications.
532,553
SF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-13
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 8
60-MIL DOUBLE-SIDED TEXTURED HDPE GEOMENBRANE LINER
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
8 Equipment, labor and materials to install the
primate and secondary geomembrane liner
including but not limited to source quality
control, installing, seaming, temporary and
permanent anchoring (excluding excavation and
backfill of anchor trench), material for seam
overlaps, anchor trench and rub sheets, quality
control testing (destructive and nondestructive),
repairing, repairing all liner leaks identified by
geolectric survey and marked for repair, and all
documentation required to complete the work
consistent with the Construction Drawings and
Technical Specifications
488,111
SF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 9
60-MIL SINGLE-SIDED TEXTURED HDPE GEOMEMBRANE LINER
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
9 Equipment, labor and materials to install the
primate and secondary geomembrane liner
including but not limited to source quality
control, installing, seaming, temporary and
permanent anchoring (excluding excavation and
backfill of anchor trench), material for seam
overlaps, anchor trench and rub sheets, quality
control testing (destructive and nondestructive),
repairing, repairing all liner leaks identified by
geoelectric survey and marked for repair, and
all documentation required to complete the
work consistent with the Construction Drawings
and Technical Specifications
44,442 SF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-14
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 10

DOUBLE-SIDED GEOCOMPOSITE
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
10 Equipment, labor, and materials for performing
all work necessary including, but not limited to,
source quality control, installing, seaming,
temporary and permanent anchoring (excluding
excavation and backfill of anchor trenches),
quality control testing, repairing, work
associated with repairing all liner leaks
identified by geoelectric survey and marked for
repair, and all documentation required to
complete and document the work consistent the
Construction Drawings and the Technical
Specifications.
532,553
SF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 11

OPERATIONS LAYER
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
11 Equipment, labor and materials to excavate,
handle, stockpile, moisture condition, transport
and complete operations layer construction
across liner areas and to stockpile remaining
operations layer soil near Phase 5 as shown on
the Construction Drawings and as specified in
the Technical Specifications. Includes repairing
any damage during placement to underlying
geosynthetics and all work associated with
repairing all liner leaks identified by geoelectric
survey and marked for repair.
17,464
CY $___________ $_________________
*"A" x "B" = "C" $_________________
BD-15
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 12
4 INCH DIAMETER HDPE LATERAL PIPE (SOLID)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
12 Equipment, labor and materials to install the
solid pipe (including fittings) to the lines and
grades shown on the Construction Drawings
and Technical Specifications.
8 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 13
4 INCH DIAMETER HDPE LATERAL PIPE (PERFORATED)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
13 Equipment, labor and materials to install the
perforated pipe (including fittings) to the lines
and grades shown on the Construction
Drawings and Technical Specifications.
1,020 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 14
8 INCH DIAMETER HDPE HEADER PIPE (SOLID)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
14 Equipment, labor and materials to install the
solid pipe (including fittings) to the lines and
grades shown on the Construction Drawings
and Technical Specifications.
8 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-16
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 15
8 INCH DIAMETER HDPE HEADER PIPE (PERFORATED)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
15 Equipment, labor and materials to install the
perforated pipe (including fittings) to the lines
and grades shown on the Construction
Drawings and Technical Specifications.
298 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 16

LCRS DRAINAGE GRAVEL
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
16 Equipment, labor and materials to place LCRS
drainage gravel and 12-mil LLDPE
geomembrane cover and sandbag anchors as
shown on the Construction Drawings and
Technical Specifications.
1,538 CY $___________ $_________________
*"A" x "B" = "C" $_________________
BD-17
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 17
8 OZ. NON-WOVEN LCRS GEOTEXTILE
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
17 Equipment, labor, and materials for performing
all work necessary including, but not limited to,
source quality control, installing, seaming,
temporary and permanent anchoring (excluding
excavation and backfill of anchor trenches),
quality control testing, repairing, work
associated with repairing all liner leaks
identified by geoelectric survey and marked for
repair, and all documentation required to
complete and document the work consistent the
Construction Drawings and Technical
Specifications
23,070
CY $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 18
PHASE 4 TO PHASE 5 FLOOR LINER TIE-IN
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
18 Equipment, labor and materials to expose the
existing liner system, install low permeability
soil, overlap and attach geosynthetic
components and weld geomembrane. Includes
any required excavation, loading, hauling and
/or disposal of incidental refuse that may be
encountered when exposing the existing floor
liner tie-in.
741 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-18
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 19
PHASE 4 TO PHASE 5 SIDE SLOPE LINER TIE-IN
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
19 Equipment, labor and materials to expose the
existing side slope liner system, install low
permeability soil, overlap and attach
geosynthetic components and weld
geomembrane. Includes any required
excavation, loading, hauling and /or disposal of
incidental refuse that may be encountered when
exposing the existing floor liner tie-in.
162 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 20

CREST ANCHOR TRENCH (SOUTHERN & NORTHERN)
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
20 Equipment, labor and materials to locate,
prepare, excavate, shape, backfill and compact
the crest anchor trenches shown on the
Construction Drawings and as described in the
Technical Specifications.
571 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 21

SIDE SLOPE LINER TERMINATION & ANCHOR TRENCH
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
21 Equipment, labor and materials to prepare the
side slope liner termination and the side slope
anchor trench. Includes all soil excavation,
trench shaping, backfilling, and compaction as
shown on the Construction Drawings and as
described in the Technical Specifications.
106 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-19
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 22

FLOOR LINER TERMINATION
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
22 Equipment, labor and materials to excavate
soils, backfill trenches, place plywood sheets,
install compacted low permeability soils,
construct soil termination berm from engineered
fill. Includes construction of the floor liner
access ramp from engineered fill as shown on
the Construction Drawings and Technical
Specifications.
758 LF $___________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 23

SURVEYING
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
23 Equipment, labor and materials to perform
construction control and slope staking, surveys
to complete quantities, surveys to document asbuilt conditions of the Phase 4 construction and the preparation of Record Drawings as
described in the Technical Specifications.
1 LUMP SUM $_________________
*"A" x "B" = "C" $_________________
BD-20
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 24

HYDROSEEDING
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
24 Equipment, labor and materials to hydroseed
the areas shown on the Construction Drawings
and Technical Specifications

3.0 ACRES $__________ $_________________
*"A" x "B" = "C" $_________________
BASE BID 25

SWPPP PREPARATION
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
25 Implement permit conditions during
construction including Notice of Intent.

Prepare and implement a Storm Water
Pollution Prevention Plan (SWPPP). All
permits and/or regulatory fees should be
included in this price
1 LUMP SUM $_________________
*"A" x "B" = "C" $_________________
BASE BID 26

GEOMEMBRANE LEAK DETECTION TESTING SUPPORT
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
26 Equipment, labor and materials to support the
geomembrane leak detection testing including
purchasing and installing the copper
permanent ground wire and providing labor, a
water truck, water supply and other support as
described in the Technical Specifications.
1 LUMP SUM $_________________
*"A" x "B" = "C" $_________________
BD-21
California Street Landfill Phase 5 Expansion Project FCS02172026NA BASE BID 27
OVER-EXCAVATE MONITORING WELL B-5B DECOMMISSION
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
27 Equipment, labor and materials to overexcavate the neat-cement grout column located at the former location of monitoring well B5B. Backfill with engineered fill to the design liner subgrade elevations as shown on the
Construction Drawings and described in the
Technical Specifications.
1 LUMP SUM $_________________
*"A" x "B" = "C" $_________________
BASE BID 28

LLDPE GEOMEMBRANE COVER AND BALLAST SYSTEM
Item
No. Brief Description *A Quantity
*B
Unit Price
*C
Total Price in
Figures
28 Equipment, labor and materials to install the
LLDPE geomembrane cover and ballast
system as shown on the Construction
Drawings and described in the Technical
Specifications.
39,016 SF $___________ $_________________
*"A" x "B" = "C" $_________________
BD-22
California Street Landfill Phase 5 Expansion Project FCS02172026NA

BASE BID SUMMARY TABLE
CALIFORNIA LANDFILL PHASE 5 EXPANSION
FCS02172026NA
BD-23
Item
Number Price Item Number Price
1 $ 15 $
2 $ 16 $
3 $ 17 $
4 $ 18 $
5 $ 19 $
6 $ 20 $
7 $ 21 $
8 $ 22 $
9 $ 23 $
10 $ 24 $
11 $ 25 $
12 $ 26 $
13 $ 27 $
14 $ 28 $

TOTAL OF ALL LINE ITEMS IN

NUMBERS
A $
Contractor Name Email
Contractor’s License Number Phone
Contractor’s DIR Number Contact
California Street Landfill Phase 5 Expansion Project FCS02172026NA

BID SUMMARY TABLE

BASE BID

CLERK READS THIS PAGE
BASE BID A - CALIFORNIA STREET LANDFILL PHASE 5
EXPANSION – FCS02172026NA Total (in figures)
Base Bid Total: (Transfer from Location A Page BD 23) $__________________ (TOTAL BID PRICE WRITTEN IN WORDS)
LOW BID DETERMINATION – PLEASE CHECK YOUR MATH
The low bid will be determined pursuant to Public Contract Code Section 20103.8 as the lowest bid price on the Bid Schedule Total Price on page BD-26. A responsible bidder who submits the lowest base bid as determined by the above method shall be awarded the contract, if it is awarded, by the City Council of the City of Redlands.

If the total price written in words, and the total price written in figures are not in agreement, then the total price written in words will be considered as representing the Bidder’s intention, and the totals will be corrected by the City to conform thereto
All Permits and Inspections are to be pulled by bidder, paid for by bidder.

Contractor Name Email
Contractor’s License Number Phone
Contractor’s DIR Number Contact
BD-24
California Street Landfill Phase 5 Expansion Project FCS02172026NA

ADDENDA ACKNOWLEDGEMENT
Receipt of the following addenda is hereby acknowledged and the same is included in the Bid Price:

Addendum #1___________ Addendum #2___________ Addendum #3____________ (initials) (initials) (initials)
Addendum #4___________ Addendum #5___________ Addendum #6____________ (initials) (initials) (initials)
Addendum #7___________ Addendum #8___________ Addendum #9____________ (initials) (initials) (initials)
ATTEST: (if Corporation)
(Corporation Seal)
___________________________________ _____________________________________ Company Name Signature
____________________________________ _____________________________________ Address Name
____________________________________ _____________________________________ City, State, Zip Title
BD-25
California Street Landfill Phase 5 Expansion Project FCS02172026NA

BID CERTIFICATION
The undersigned certifies that they are familiar with the various State and local laws affecting labor, length of working days, employer's liabilities, Sunday work, alien labor, domestic materials, Subcontractors, etc.

It is understood and agreed that the work under the contract will be commenced by the undersigned Bidder, if awarded the contract, within ten (10) calendar days from the date in the Notice to Proceed and will be completed by the Contractor in the time set forth in the CONTRACT.

Enclosed find Bidders bond or certified or cashier's check No. _________________ on the __________________________________ Bank, in the amount of ______________________ _______________________ which is not less than ten percent (10%) of the Bid submitted by the undersigned, made payable to the City of Redlands, California and which is given as a guarantee that the Bidder agrees that in case of their default in executing said contract with necessary bonds, the bond or check accompanying this Bid and the money made payable shall become and remain the property of the City of Redlands.

It is understood and agreed that the City of Redlands has the right to waive defects or irregularities and to accept or reject any or all Bids. No Bidder may withdraw their Bid for a period of forty-five (45) days after the time of the Bid Opening.

The following information, required by State law under penalty of perjury, is true and correct. Failure to complete this information renders the bid non-responsive, and the bid must be rejected. ____________________________________ _______________________________________ Company Name Signature
____________________________________ _______________________________________ Address Signatory's Title
____________________________________ _______________________________________ City, State, Zip State License Number and Class
____________________________________ _______________________________________ Telephone Number License Expiration Date
Dated this ________________ day of ___________________, 20_____.

BD-26
California Street Landfill Phase 5 Expansion Project FCS02172026NA

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That ______________________________________________________________ as Principal, and ______________________________________ as Surety, are held and firmly bound unto the City of Redlands, hereinafter called City, in the sum of ______________________________________ dollars, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to said City to perform all work required under the CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT NUMBER FCS02172026NA.

NOW, THEREFORE, if said Principal is awarded a contract by said City and, within the time and in the manner required under the heading "Instructions to Bidders" bound with said Specifications, enters into a written contract on the form of agreement bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials; then this obligations shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said City and Judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney's fee to be fixed by the court.

SIGNED AND SEALED, this _________ day of _____________________________, 20____. ______________________________(SEAL) _______________________________(SEAL) (Principal) (Surety)
By:_________________________________ By:__________________________________ (Signature) (Signature)
Address:______________________________
_____________________________________
Telephone (___)________________________
(Seal and Notarial Acknowledgment of Surety)
BD-27
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER

NON-COLLUSION AFFIDAVIT

STATE OF )
) ss

COUNTY OF )
, being first duly sworn, deposes and says that

he is
(Sole Owner, a Partner, President, Secretary, etc.)
of
(Contractor)
the party making the foregoing bid on CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT FCS02172026NA that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or of any other Bidder or to fix any overhead, profit, or cost element of the bid price or of that of another bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that the Bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

By: ______________________________ Title______________________________ Subscribed and sworn to before me this day of ___________________, 20_____.

Signature of Officer Administering Oath
(Notary Public)
BD-28
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER
OFFICERS OF CORPORATION (Members of Firm)
The names of all persons interested in the foregoing proposals as principals, are as follows: (IMPORTANT NOTICE - if Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if Bidder or other interested person is an individual, state first and last names in full). _______________________________________ ____________________________________ _______________________________________ ____________________________________ _______________________________________ ____________________________________ Licensed in accordance with an act providing for the Registration of Contractors, License No. ______________________________________.

Signature of Bidder Dated
NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer(s) authorized to sign contracts on behalf of the corporation; if Bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership, and if the Bidder is an individual, that signature shall be placed above.

BD-29
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER

SUB-CONTRACTORS LIST
Bidder supplies the following information for any Subcontractor, installer, fabricator, equipment rental with operator, etc. to be used on CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT FCS02172026NA, all in accordance with Section 4104 of the California Public Contract Code. The Bidder shall identify additional subcontractors on the back of this page, should there be insufficient space to complete the list.

LICENSED
SUBCONTRACTOR’S

NAME & BUSINESS

ADDRESS

LICENSE
NUMBER

SPECIFIC

DESCRIPTION OF

SUBCONTRACT &
BID ITEM #
% OF BID

ITEM TO BE

PERFORMED
BD-30
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER

MATERIAL MANUFACTURERS/SUPPLIERS LIST
Bidder shall supply the following information for any material manufacturer/supplier to be used on CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT FCS02172026NA. At a minimum, the Bidder shall provide information on the manufacturer/supplier for the HDPE geomembrane, geocomposite, geotextile, HDPE piping, bentonite, and drainage gravel. If the manufacturer is not the supplier, both parties shall be listed and identified as the manufacturer or the supplier. All materials shall be so noted on the list. The Bidder shall identify additional material manufacturers/suppliers on the back of this page, should there be insufficient space to complete the list.

LICENSED SUBCONTRACTOR’S NAME
& BUSINESS ADDRESS

MATERIAL

SUPPLYING

BID LINE
ITEM
NUMBER
BD-31
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER

QUALIFICATION AND EXPERIENCE STATEMENT
The following outline is a record of the undersigned Bidder's experience in construction of projects of a type similar in magnitude and character to that contemplated under CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT FCS02172026NA within the past five (5) years. Projects completed more than five years ago shall not be listed by the Bidder and will be grounds for rejection. Include the name and location of each project as well as the name, address, and phone number of the owner, and name of individual to contact. Also include the square footage or cubic yards of material installed.

Subcontractors performing in excess of one half of one percent of the prime Contractor’s total bid, or in the construction of streets or highways, one half of one percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater shall provide a similar outline. Additional information outlining this portion of the Bid may be written on the back-side of the experience sheet, if necessary. Failure to provide this statement may result in rejection of the bid by the City of Redlands.

GEOSYNTHETICS INSTALLER QUALIFICATIONS
A. GEOSYNTHETICS INSTALLER: The geosynthetics installation company shall have successfully installed a minimum of 10,000,000 square feet in the aggregate of welded polyethylene geomembrane, 5,000,000 square feet in aggregate GCL, and 5,000,000 square feet in aggregate of geocomposite with documented references. All experience listed by the geosynthetics installation company shall have been completed by that company. No experience shall be allowed from personnel working for another company and applying it to their present employer. The geosynthetic installer shall present project experience totaling the square footage noted above in the list below. Additional projects necessary to satisfy this requirement can be listed on the back-side of this page or attached to the bid as noted by Bidder.

Geomembrane Installer Project Qualifications

1. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Square Feet of Geomembrane:

BD-32
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER

QUALIFICATION AND EXPERIENCE STATEMENT CONTINUED

2. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Square Feet of Geomembrane:

3. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Square Feet of Geomembrane:

4. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Square Feet of Geomembrane:

5. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Square Feet of Geomembrane:

BD-33
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER CONTINUED

LOW PERMEABILITY SOIL LINER INSTALLER QUALIFICATIONS
A. LOW PERMEABILITY SOIL LINER INSTALLER: Contractor shall have successfully completed at least three similar projects with a combined minimum of 50,000 cubic yards of low permeability soil liner. At least one or more of the successful projects shall have included a minimum of 10,000 cubic yards of amending/mixing of bentonite or other low permeability soil with other soil materials to form a low permeability soil barrier layer. A subcontractor may qualify for the amending/mixing of bentonite or other low permeability soil with other soil materials portion of the work. The bentonite admix subcontractor shall be listed separately in Section B of this Part.

Evidence of successful completion with reference phone numbers shall be included with the bid documents. The company listed below shall be the same company that will be performing the work on the CALIFORNIA STREET LANDFILL PHASE 5 EXPANSION PROJECT FC02172026NA. Listing other companies, joint ventures, or the experience of current personnel performed for other companies in the list below shall be grounds for rejection of the bid. Additional projects necessary to satisfy this requirement can be listed on the back-side of this page or attached to the bid as noted by Bidder.

1. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Cubic Yards of Low Perm or Admix Liner:

LOW PERMEABILITY SOIL LINER INSTALLER QUALIFICATIONS CONTINUED

2. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Cubic Yards of Low Perm or Admix Liner:

BD-34
California Street Landfill Phase 5 Expansion Project FCS02172026NA

STATEMENT BY BIDDER CONTINUED

3. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

Name of Project:

Project Description:

Amount of Contract: Completion Date:

Total Cubic Yards of Low Perm or Admix Liner:

4. Owner's Name:

Contact Person: Phone: ( )
Address of Owner:

← All documents from this meeting