Richmond Local Roadway Safety Plan
29 Pedestrian ROW Violations
at Uncontrolled Crossings
This collision occurs when a driver
violates the pedestrian right-of-way at
uncontrolled crossings such as at two-
way stop-controlled intersections and
mid-block crossings. This is the top
violation for pedestrian-involved injury
collisions, implicated in 21% of pedestrian
KSI collisions. Of these violations, 44%
occurred at nighttime and all took
place on multilane roadways (with more
than one lane in each direction).
Pedestrians Crossing Outside
Crosswalk or Legal Crossings
This violation occurs where pedestrians
cross outside a marked crosswalk or legal
crossing. A legal crossing may include
both marked and unmarked crosswalks
at intersections and marked mid-block
locations. This violation accounts for
approximately 16% of pedestrian KSI
collisions with the majority of these
violations (71%) occurring midblock
where pedestrians are crossing outside
of a crosswalk or else walking in the
roadway, including the shoulder.
Contraflow Bike Riding
This violation occurs where bicyclists travel
in the opposite direction of vehicle traffic,
either in the roadway or on a sidewalk,
often where there are no dedicated
bicycle facilities. This violation presents
safety concerns because motorists do not
anticipate seeing or yielding to bicyclists
traveling against traffic which leaves
both parties susceptible to collisions, for
example when a driver is pulling out of a
driveway. Furthermore, when contraflow
riding leads a cyclist to travel toward
rather than away from a vehicle or other
bike moving with traffic, the gap between
parties closes more quickly leaving
less time for maneuvering and collision
avoidance. This is a top violation for bicycle
collisions implicated in 17% of bicycle
KSI collisions, occurring most often on
roadways with a speed limit of 30-35 mph
and that lack dedicated bicycle facilities.
Chapter 2: Vision and Goals
30 This plan’s focus on the Safe
System approach helps to
provide alignment with current
LRSP guidelines, but also
sets the City of Richmond up
for success in recognition of
emerging safety best practices
Richmond Local Roadway Safety Plan
31 Countermeasure Toolbox
Chapter 6
The full set of countermeasures
recommended for implementation in
Richmond are listed on the following
pages categorized by focus area.
The toolbox containing detailed
descriptions of each countermeasure
along with relevant cost and
implementation characteristics
is included in Appendix B. Note,
approximate countermeasure
costs are categorized as low
($10,000), medium ($10,000-
100,000), and high (greater than
$100,000) for general planning
purposes. Additional considerations
for equitable implementation
of these countermeasures are
noted throughout the chapter.
W
YO
HERE ARE
ONTHE
SAFE S
U
YSTEMJOURNEY ?
Implementing the Safe System approach is our shared responsibility, and we all have a role. It requires shifting how we think about transportation safety and how we prioritize our transportation investments. Consider applying a Safe System lens to upcoming projects and plans in your community: put safety at the forefront and design to accommodate human mistakes and injury tolerances. Visit safety.fhwa.dot.gov/zerodeaths to learn more.
Making a commitment to zero deaths means addressing every aspect of crash risks through the five elements of a Safe System, shown below. These layers of protection and shared responsibility promote a holistic approach to safety across the entire transportation system. The key focus of the Safe System approach is to reduce death and serious injuries through design that accommodates human mistakes and injury tolerances.
The Safe System
approach addresses
the safety of all road
users, including
those who walk,
bike, drive, ride
transit, and travel by
other modes.
Vehicles are
designed and
regulated to
minimize the
occurrence and
severity of collisions
using safety
measures that
incorporate the
latest technology.
Humans are unlikely
to survive high-speed
crashes. Reducing
speeds can
accommodate human
injury tolerances in
three ways: reducing
impact forces,
providing additional
time for drivers to
stop, and improving
visibility.
Designing to
accommodate human
mistakes and injury
tolerances can greatly
reduce the severity of
crashes that do occur.
Examples include
physically separating
people traveling at
different speeds,
providing dedicated
times for different
users to move through
a space, and alerting
users to hazards and
other road users.
When a person is
injured in a collision,
they rely on
emergency first
responders to quickly
locate them, stabilize
their injury, and
transport them to
medical facilities.
Post-crash care also
includes forensic
analysis at the crash
site, traffic incident
management, and
other activities.
Safe Road
Users
Safe
Vehicles
Safe
Speeds
Safe
Roads
Post-Crash
Care
THE SAFE SYSTEM APPROACH VS. TRADITIONAL ROAD SAFETY PRACTICES Traditional
Prevent crashes
Safe System
Prevent deaths and serious injuries
Improve human behavior Design for human mistakes/limitations Control speeding Reduce system kinetic energy
Individuals are responsible Share responsibility
React based on crash history Proactively identify and address risks Whereas traditional road safety
strives to modify human behavior
and prevent all crashes, the Safe
System approach also refocuses
transportation system design and
operation on anticipating human
mistakes and lessening impact
forces to reduce crash severity
and save lives.
SAFE SYSTEM ELEMENTS Figure 12. Safe
System Elements
Source: Fehr & Peers for FHWA
The safety strategies in this chapter
also cover the five elements of a Safe
System, as shown in Figure 12.
California is in the process of adopting
the Safe System approach and a
focus on equity as part of its Strategic
Highway Safety Plan. This plan’s focus
on the Safe System approach helps to
provide alignment with current LRSP
guidelines, but also sets the City of
Richmond up for success in recognition
of emerging safety best practices.
Chapter 6: Countermeasure Toolbox
32 Summary of
Countermeasures
Indicates a countermeasure identified
in the Local Road Safety Manual
Bikeways
• Bicycle Crossing (Solid Green Paint)
• Bicycle Ramp
• Bicycle Signal/Exclusive Bike Phase
• Bike Box
• Bike Detection
• Class II Bike Lane
• Extended Bike Lane to Intersection
• Floating Transit Island
• Green Conflict Striping
• Class IV Separated Bikeway
• Mixing Zone
• Parking Buffer
• Two-State Turn Queue Bike Box
• Extend Green Time for Bikes
• Bicycles May Use Full Lane Sign
Intersections & Roadways
• Rumble Strips
• All-Way Stop Control
• Centerline Hardening
• Close Slip Lane
• Directional Median Openings
to Restrict Left Turns
• Guardrail
• Median Barrier
• Roundabout
• Signal
• Intersection Reconstruction
and Tightening
• Lane Narrowing
• Left Turn Enhanced Daylighting/
Slow Turn Wedge
• Paint and Plastic Median
• Paint and Plastic Mini Circle
• Partial Closure/Diverter
• Protected Intersection
• Raised Crosswalk
• Raised Intersection
• Raised Median
• Refuge Island
• Reduced Left-Turn Conflict Intersection
• Road Diet
• Speed Hump or Speed Table
• Splitter Island
• Straighten Crosswalk
Other
• Access Management/Close Driveway
• Intersection Lighting
• Segment Lighting
• Curbside Management
• Far-Side Bus Stop
• Delineators, Reflectors, and/
or Object Markers
• Median Guardrail
• Speed Limit Reduction
• Relocate Hazardous Utility Poles
• Remove Obstructions For Sightlines
• Upgrade Lighting to LED
• Red Light Camera
ENGINEERING
Richmond Local Roadway Safety Plan
33 Pedestrian Facilities
• Audible Push Button Upgrade
• Add Sidewalk
• Install/Upgrade Pedestrian
Crossing at Uncontrolled Locations
(Signs and Markings Only)
• Co-Locate Bus Stops and
Pedestrian Crossings
• Curb Extensions
• Extended Time Pushbutton
• High-Visibility Crosswalk
• Pedestrian Countdown Timer
• Pedestrian Hybrid Beacon
• Landscape Buffer
• Leading Pedestrian Interval
and Pedestrian Recall
• Pedestrian Detection
• Removing Crossing Prohibition
• Restripe Crosswalk
• Upgrade Curb Ramp
• Widen Sidewalk
• Rectangular Rapid Flashing Beacon
Signals
• Retroreflective Tape on Signals
• Supplemental Signal Heads
• Advanced Dilemma Zone Detection
• Extend Pedestrian Crossing Time
• Extend Y ellow and All Red Time
• Flashing Y ellow Turn Phase
• Pedestrian Scramble
• Prohibit Left Turn
• Prohibit Turns During Pedestrian Phase
• Protected Left Turns
• Prohibit Right-Turn-on-Red
• Separate Right-Turn Phasing
• Shorten Cycle Length
• Signal Interconnectivity and
Coordination / Green Wave
• Speed Sensitive Rest in Red Signal
• Upgrade Signal Head
Signing & Striping
• Advance Stop Bar
• Advance Yield Markings
• Flashing Beacon as Advance Warning
• LED-Enhanced Sign
• Painted Centerline and Raised
Pavement Markers at Curves
on Residential Streets
• Speed Feedback Sign
• Speed Legends on Pavement
at Neighborhood Entries
• Striping Through Intersection
• Time-Based Turn Restriction
• Upgrade Intersection
Pavement Markings
• Upgrade Signs with
Fluorescent Sheeting
• Upgrade Striping
• Upgrade to Larger Warning Signs
• Wayfinding
• Yield to Pedestrian Sign
Chapter 6: Countermeasure Toolbox
34 Engineering
Crosswalk Policy Best Practices
Uncontrolled pedestrian crossings occur
where sidewalks or designated walkways
intersect a roadway at a location where
no traffic control (e.g., traffic signal or
stop sign) exists. This crossing type
occurs at intersections (marked or
unmarked) and at mid-block locations
Figure 13. Application of Pedestrian Crash Countermeasures by Roadway Features Source: FHWA
(where they must be marked). Research
has demonstrated the importance of
marking uncontrolled crossings to
facilitate access to key destinations
while ensuring that additional safety
treatments are applied at these locations
if they have higher traffic speeds and
volumes. The FHWA Guide for Improving
Pedestrian Safety at Uncontrolled Crossing
Locations proposes countermeasures
based on road conditions, crash
causes, and pedestrian safety issues.
Figure 13 summarizes recommendations
from the guide, includes a comprehensive
matrix and list of FHWA-approved
pedestrian crash countermeasures
suggested for application at
uncontrolled crossing locations per
roadway and traffic features.
Signifies that the countermeasure is a candidate treatment at a marked uncontrolled crossing location. The absence of a number (#) signifies that the countermeasure is
generally not an appropriate treatment, but exceptions
may be considered following engineering judgment.
Signifies that the countermeasure should
always be considered, but not mandated or
required, based upon engineering judgment at
a marked uncontrolled crossing location.
#
POSTED SPEED LIMIT AND AADT
Vehicle AADT
<9,000
Vehicle AADT
9,000-15,000
Vehicle AADT
>15,000
Roadway Configuration ≤30 mph 35mph ≥40mph ≤30 mph 35mph ≥40mph ≤30 mph 35mph ≥40mph 2 lanes
1 lane in each direction
1 2 1 1 1 1 1 1 1 1
4 5 6 5 6 5 6 4 5 6 5 6 5 6 4 5 6 5 6 5 6
7 9 7 9 7 9 7 9 7 9 7 9 9
3 lanes
WITH RAISED MEDIAN
1 lane in each direction
1 2 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
4 5 5 5 4 5 5 5 4 5 5 5
7 9 7 9 7 9 7 9 7 9 7 9 7 9 9
3 lanes
WITHOUT RAISED MEDIAN
1 lane in each direction with a two-way left-turn
lane
1 2 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
4 5 6 5 6 5 6 4 5 6 4 5 6 5 6 4 5 6 5 6 5 6
7 9 7 9 9 7 9 7 9 9 7 9 9 9
4+ lanes
WITH RAISED MEDIAN
2 or more lanes in each direction
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
5 5 5 5 5 5 5 5 5
7 8 9 7 8 9 8 9 7 8 9 7 8 9 8 9 7 8 9 8 9 8 9
4+ lanes
WITHOUT RAISED MEDIAN
2 or more lanes in each direction
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
5 6 5 6 5 6 5 6 5 6 5 6 5 6 5 6 5 6
7 8 9 7 8 9 8 9 7 8 9 7 8 9 8 9 7 8 9 8 9 8 9
Signifies that crosswalk visibility enhancements
should always occur in conjunction with
other identified countermeasures.
Key
1 High-visibility crosswalk
markings, parking
restrictions on crosswalk
approach, adequate
nighttime lighting levels,
and crossing warning signs
2 Raised crosswalk
3 Advance “Yield Here
To (Stop Here For)
Pedestrians” sign and
yield (stop) line
4 In-street pedestrian
crossing sign
5 Curb extension
6 Pedestrian refuge island
7 Rectangular rapid-
flashing beacon (RRFB)*
8 Road diet
9 Pedestrian hybrid
beacon (PHB)*
*It should be noted that
the PHB and RRFB are
not both installed at the
same crossing location
ENGINEERING
Richmond Local Roadway Safety Plan
35 Demand Considerations
for Crosswalks
Uncontrolled and mid-block crossings
should be identified as a candidate for
marking if there is a demonstrated need
for a crosswalk. Figure 14 provides a
protocol for deciding if a crosswalk is
appropriate. Engineering judgment should
ultimately be used to select locations
appropriate for a marked, uncontrolled
crossing. Enhanced treatments beyond
basic striping and signing should be
considered for uncontrolled locations,
as shown on the facing page.
OR
NO
NO
NO
NO
NO
NO
YES
YES
YES
YES
YES
FEASIBLE
OR
25 20 pedestrians per hour
cross (in any two hours,
not necessarily
consecutive)
Location connects two
pedestrian generators such
as a school, park, bus stop,
hospital, neighborhood
serving commercial center,
or multi-family residential
Insufficient need to justify
marked crossing
Nearest appropriately
marked or protected
crosswalk is at least
300 /f_t or more away
Low speed (posted or
prima facie 25 MPH),
2-lane roadway
Direct pedestrians to the
nearest marked or
protected crossing
Pedestrians can be easily
seen from a feasible
stopping sight distance
It is feasible to remove
sight obstruction or lower
the speed limit
Consider installing a stop
sign, signal, or grade
separation
Use Crossing Guidance to
determine treatment
options
Should a crosswalk be installed?
Figure 14. Samples of Decision Tree for Marking Crosswalks Source: Fehr & Peers
ENGINEERING
Chapter 6: Countermeasure Toolbox
36 Figure 15. Crosswalk
Marking Examples
Source: Fehr & Peers
Triple-four markings include two
dashed lines on the outside with a
clear space in the center to direct
pedestrian traffic and are often
enhanced with outer rows of raised
pavement markers. They may be
less costly to install and maintain
as they require less paint than a
standard high visibility crosswalk.
ENGINEERING Crosswalk Markings
Crosswalk markings help drivers know
where to expect pedestrians and provide
guidance for pedestrians crossing the
roadway by defining and delineating
paths on approaches to uncontrolled
and mid-block locations. The use of high
visibility striping is appropriate at both
uncontrolled crossing locations, and
signalized locations as traffic volumes,
speeds, and vehicle-pedestrian conflicts
require. There are several treatments
for high visibility markings, including the
ladder, continental and triple-four (also
called double continental) markings,
shown in Figure 15. The City of Richmond
should choose a preferred style to use,
Triple-FourContinentalLadderStandard
so it is consistently applied. The City may
also want to adopt a policy of using high
visibility markings at all marked crosswalks
when intersection upgrades occur.
Continental striping is often chosen to
communicate sensitive pedestrian crossing
areas as the designated high visibility
tool. Research shows that continental
crosswalk markings are more visible
to drivers at night than parallel line
markings.
9 Crosswalks with longitudinal
lines parallel to traffic flow allow drivers
to see the marked crosswalk from a
greater distance, when compared with
standard markings. This increased visibility
distance gives drivers more time to safely
stop for a pedestrian waiting to cross.
Additional Resources
9 Fitzpatrick, K., S. Chrysler, V. Iragavarapu, and
E.S. Park. Detection Distances to Crosswalk
Markings: Transverse Lines, Continental Markings,
and Bar Pairs. Transportation Research Record:
Journal of the Transportation Research Board,
No. 2250. Transportation Research Board of the
National Academies, Washington, DC, 2011.
Richmond Local Roadway Safety Plan
37 Education
Traffic safety education plays an important
role in shaping and shifting behavior.
Many cities, such as Seattle, Oakland, and
Los Angeles, are including community
engagement and education to make
streets safer for all. Education on traffic
safety requires a collaborative process
among many stakeholders to achieve
the goal of increased safety. Targeted
education can be directed at vulnerable
populations, with the help of local partners,
and at certain behaviors of drivers,
pedestrian, and bicyclists to deter specific
collision types. Such programs can be
structured classes, such as road school for
cyclists, or outreach campaigns, such as
signs that discourage distracted driving.
Public Education
Media Campaign
A public education media campaign
focused on discouraging drinking and
driving and/or speeding, along with
encouraging increased awareness
of pedestrians and bicyclists at night
and appropriate crosswalk behaviors,
can help promote behavior change.
Messages about safe and responsible
driving, moving over for EMS vehicles,
awareness of bicyclists and pedestrians,
and increasing visibility at night can help
promote behaviors that prevent fatal
and severe collisions. As an example,
collaborating with local radio stations
can help spread the message to drivers.
Richmond can develop targeted outreach
education campaigns that focus on
the common violations that lead to
fatalities and severe injuries. Based on
collision profiles developed for this LRSP,
EDUCATION
education and outreach campaigns
may include the programs listed here.
Partner with Local Schools
on Traffic Safety
Local schools can be partners in promoting
safe driver behavior during school pick-
up and drop offs. Education campaigns
can involve students promoting safer
driving to their parents, such as holding
signs during pick-up and drop offs that
encourage safer driving. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Culturally Relevant Engagement
Community engagement is not a
one-size-fits-all model as different
communities have different needs. By
developing culturally relevant engagement
strategies, all participants are invited into
conversations about safety. Culturally
relevant engagement strategies can help
education and programming around traffic
safety reach a larger audience and be
more impactful. For example, including
cultural markers of a local community, such
as contracting with popular local food
vendors to cater engagement activities,
can be a creative and welcoming way
of engaging residents. Meeting people
"where they are" to gather input on
safety issues at local parks can more
effectively engage parents and children
rather than expecting families to attend
a meeting at a government building.
For drivers this may include:
• Education campaign that emphasizes
that speeding is deadly because unsafe
speeding caused 19 percent of crashes
and 20 percent of KSI crashes.
• Education campaign around
driving under the influence, as 10
percent of Richmond KSI crashes
involve drugs or alcohol.
• Education campaign encouraging drivers
to be aware of left-turn conflicts and
pedestrians in the road because left-
turn vehicle right-of-way violations are
responsible for 2 percent of all KSI and
pedestrian right-of-way violations at
uncontrolled crossings are involved in 15
percent of bicycle and pedestrian KSI.
For people biking:
• Classes that teach bicyclists how to
use on-street bike facilities, especially
for those facility types that are new to
or relatively uncommon in the City.
For people walking:
• Education campaign encouraging
crossing in crosswalks because 10
percent of bicycle and pedestrian
KSI occurred when a pedestrian was
crossing not in a crosswalk. However,
other approaches are also needed to
mitigate pedestrian crashes because
many pedestrian crashes occurred when
a pedestrian was using a legal crossing.
Figure 16. Community
Engagement Examples
Chapter 6: Countermeasure Toolbox
38 Developing Education
Materials Related to Roadway
Design Changes
Temporary demonstrations, like pop-up
installations, can physically showcase
proposed safety infrastructure to the public
and emergency response in a tangible
way. Lastly, preparing materials and videos
focused on new types of roadway design
and Richmond’s major violation issues
(e.g. speed, DUIs, left-turn violations,
pedestrian crossings, and contraflow
bike riding) can direct community
conversations for meaningful outcomes.
EDUCATION Partner with Community Experts
Local partners can serve as community
liaisons between the City and the public.
Working with community partners such as
Rich City Rides and the RYSE Center, and
public institutions, such as the Richmond
Public Library, that have relationships with
residents strengthens the engagement
process by building trust and engaging
an established base of stakeholders.
Local partners can help tailor the
engagement process or help incorporate
engagement into existing programs
and resources to educate people more
effectively about roadway safety.
Education Program Efficacy
NHTSA has compiled a comprehensive
report on efficacy for programmatic
safety countermeasures in their
Countermeasures that Work (2017)
report. This report includes many
education strategies, such as:
• Education regarding medication
• Driver education for younger
and older drivers
• Driver training for pedestrian
and bicyclist safety
• Bicycle safety education for
children and adults
However, research on the efficacy of
education programs is limited, and each
of these education countermeasures
is rated in the report as having still
undetermined effectiveness or limited/
no high-quality evaluation evidence.
Figure 17. (Left to Right) City of Sacramento Education Videos, SFMTA Vision Zero Informational Signs, LADOT Pop-Up Installation Enforcement Sources: LA Streetsblog, Vision Zero SF, City of Sacramento
Richmond Local Roadway Safety Plan
39 Enforcement
Equity Considerations
Enforcement of traffic laws is a common
strategy to increase street safety, but
historical enforcement techniques and
strategies have raised concerns about
racial profiling, police violence, and the
impacts of policing on communities of
color. According to the US Department
of Justice, Black and Hispanic people
are more likely than white people to
experience use of force when they
are stopped by police. To ensure that
efforts to improve safety recognize
that all people have the right to move
about their communities safely, cities
have shifted to equity-based strategies
that target specific reckless behaviors
that pose the highest safety risk while
working to mitigate potential inequities
in enforcement. In 2020, the Safe
Routes to School Partnership removed
enforcement as part of its 6 E’s for Safe
Routes to School and replaced it with
engagement as a strategy for encouraging
safe travel to school. In 2021, the
Governor's Highway Safety Association
made recommendations to invest in
social programs to alleviate enforcement
burdens and prevent recidivism, along
with training for officers on topics of
racism, bias, and de-escalation.
High Visibility Enforcement
High visibility enforcement is a multifaceted
approach to enforcement that involves
garnering public attention to traffic safety
laws through highly visibly patrols, such
as checkpoints, saturation patrols, or
message boards. Across several topic
areas, high visibility enforcement is often
the most effective form of enforcement,
in terms of safety outcomes, according to
NHTSA research. The goal of high visibility
• Progressive traffic fine structures, such
as a sliding scale for traffic fines based on
a driver’s income, developing payment
plans, or giving first offenders the
opportunity to take a safety class focuses
enforcement on behavior change.
• Analyzing available demographic
data in traffic citations can help the
City of Richmond understand if traffic
enforcement is being implemented
universally or if specific communities are
experiencing disparities in enforcement.
• Since enforcement practices, like traffic
stops, require the discretion of police
officers, it is possible for implicit bias to
affect how and to whom officers issue
traffic citations. Assessing traffic citation
demographic and geographic data can
help uncover inequities in policing and
the enforcement of traffic safety.
Equity considerations can be considered in a range
of enforcement strategies, including:
Figure 18. Automated Speed Enforcement
Source: CBC News
ENFORCEMENT
Chapter 6: Countermeasure Toolbox
40 enforcement is to promote voluntary
compliance with traffic laws. High visibility
enforcement can target specific traffic
violations for a short period of time to
encourage drivers to stop engaging in a
traffic violation. For example, speeding can
be targeted in an area so that the public is
aware that speed limits are enforced in the
area. Another high visibility enforcement
strategy is publicized sobriety checkpoints
which are used to deter impaired driving
on national holidays or weekends where
more people are likely to drink and drive.
Automated Enforcement
Automated enforcement, such as redlight
cameras or speed cameras, target
the specific drivers who are behaving
dangerously. A strictly data-driven
approach to automated enforcement
might place red-light or speed cameras
in locations with the highest number of
collisions. Speed safety cameras are a
tool that has been proven in cities across
the United States and abroad to reduce
excessive speeding and severe and
fatal injury traffic collisions. The National
Highway Traffic Safety Administration
reports that fixed speed cameras reduce
injury crashes by 20 to 25 percent, and
mobile speed cameras reduce injury
collisions by 21 to 51 percent. Seattle saw
the average number of traffic violations
decrease by 64% in a two-year period
after installation of speed cameras. 90%
of offenders in Seattle did not receive
another citation after being cited one
time for speeding. This tool is not yet
legal in California so a change to state
law would be required before this
technology could be applied in Richmond.
Speed Limit Setting
The California Zero Traffic Fatalities Task
Force conducted a year-long study to
assess the existing speed limit setting
methodology in California. The Task Force
found that the existing methodology, which
sets speed limits as the 85th percentile of
speed and traffic surveys, is not flexible
enough to meet the needs of urban areas
and recommends the development of
a new context-sensitive approach that
sets speed limits to prioritize safety for
all users. Lower maximum speed limits
reduce crashes and fatalities. While lower
posted speeds can help reduce crashes,
they are more effective at encouraging
driving at desired speeds when
implemented through comprehensive
efforts including installation of road safety
improvements or enforcement. The
passage of AB 43 in 2021 provides
jurisdictions flexibility to set speed
limits below the 85th percentile for
"safety corridors" with a documented
history of severe and fatal collisions.
Beyond Traditional Enforcement
Alternatives to law enforcement
involve investing in cross-sector
partnerships to promote traffic safety.
Alternatives include:
• Community partners can be hired
as Street Safety Ambassadors and
canvas along corridors where there
are severe traffic fatalities or where
communities are experiencing the
most traffic stops or tickets for traffic
violations. Hiring community members
as Street Safety Ambassadors also
serves as an opportunity to build
trust between government agencies
and the public since community
partners typically have preexisting
relationships in the community.
• Hiring Social Workers, Mental Health
Counselors, Addiction Specialists,
and other unarmed, specifically
trained professionals can serve as a
supplement to traffic enforcement.
• Partnering with local departments
of mental health and public health
can deescalate traffic enforcement
by treating traffic safety violations
as a public safety issue.
Figure 19. Lower Speed Limits in School Zone
Source: Tim Berger/Burbank Leader
ENFORCEMENT
Richmond Local Roadway Safety Plan
41 • De-escalating traffic enforcement
through government partnerships
with public-facing agencies can also
work to foster trust with the public
during moments where there are
national discussions on public safety
regarding the police. For example,
the City of Oakland partners with
parking enforcement to enforce
traffic laws in a deliberate effort to
disarm the enforcement of traffic
violations. This approach shifts
traffic safety to nonsworn officers
while still enforcing traffic laws.
Enforcement Efficacy
The National Highway Traffic Safety
Administration (NHTSA) has compiled
a comprehensive report on efficacy for
enforcement safety countermeasures
in their Countermeasures that Work
(2017) report. This report includes
many enforcement strategies,
and those with the highest safety
efficacy rating are listed below:
• Publicized sobriety checkpoints
• High-visibility DUI patrols
• High-Visibility seat belt
laws enforcement
• Communications and outreach
supporting enforcement efforts
• High-visibility child restraint
laws enforcement
• Automated speed enforcement
• Speed limits
• High-visibility cell phone
laws enforcement
• Learner's permit and intermediate
driver license restrictions, including
nighttime and passengers
• License screening, testing and
restriction for older drivers
• Pedestrian Safety Zones, pairing
enforcement and education with
engineering countermeasures
at a specific location
Strategies for
DUI Collisions
Driving under the influence is a major
factor in fatal and severe collisions
that is most effectively addressed
through enforcement and related
strategies. Three types of policy
instruments have been used to reduce
rates of driving under the influence:
• Deterrence
• Prevention
• Limited access
Deterrence policies focus on raising the
actual and perceived risk of detection
of driving under the influence. These
policies should be highly visible to
increase awareness of the risks of driving
under the influence. Publicized sobriety
checkpoints, saturation patrol, and other
forms of high visibility and enforcement
are effective for safety outcomes.
Prevention and education policies
focus on mobilizing and educating the
community and intervening before
driving under the influence takes
place. According to NHTSA research,
alcohol problem assessment and
treatment programs, as well as alcohol
intervention in settings such as a doctor's
office, are highly effective strategies
for improving safety outcomes.
Partnerships with healthcare providers
in Richmond can be an important piece
of combating DUIs. Other opportunities
include partnering with TNCs (e.g.,
Lyft or Uber) to reduce drinking and
driving can help promote safety on
the road and prevent fatal and severe
collisions. Limited access policies focus
on making underage access to alcohol
and drugs more difficult and limiting
excessive alcohol consumption.
ENFORCEMENT
Chapter 6: Countermeasure Toolbox
42 Emergency Services
Traffic collision victims have a higher
chance of survival if they can quickly
receive medical care. In many cases, law
enforcement officers and fire department
staff are the first responders to arrive at a
collision location. In addition to equipping
all first responders with the appropriate
training, improving response times for
Emergency Medical Services will help
improve collision victims’ chances of
survival. Traffic crashes can also put first
responders’ and other road users’ lives
at risk due to increased congestion,
which may lead to secondary crashes.
Strategies to improve response time
and safety for EMS include designing
emergency vehicles to be highly visible
(e.g. retroreflective striping and chevrons,
high-visibility paint, and built-in passive
light) and implementing emergency
vehicle signal preemption, which allows
emergency vehicles to break a normal
signal cycle and proceed through
an intersection. Lastly, emergency
responders can use data collected on
historical medical care in the City to
improve care and use best practices.
Trauma Care
Effective emergency trauma care can
increase crash survival rates by as much as
25 percent, and an effective countywide
trauma care coordination system can
reduce fatalities by 50 percent. Key
factors that influence the survivability of
crashes are: proximity to care (how near
is an appropriate trauma care center),
response time, equipment, technology,
and EMS training. The faster a traumatic
EMERGENCY SERVICES injury victim receives medical care, the higher the chances are of preventing
death. Recommended strategies to
improve trauma care include providing
funding for appropriate first responder
equipment (e.g. hydraulic and pneumatic
extrication tools), research and adoption
of technology aimed at reducing triage
time (e.g. automatic vehicle reporting
of severe crashes to EMS, EMS vehicle
collision avoidance systems, and
geolocation of nearest appropriate
EMS vehicles), and promotion of federal
and state-certified training programs.
Expanded access to and number of trauma
care facilities is another major factor in
improving outcomes for crash victims.
Data Sharing
Sharing data regarding on-scene
time, patient destination and patient
outcomes (as allowable by privacy law)
would allow Richmond to effectively
monitor triage performance and EMS
system effectiveness. Issuing annual
research regarding the findings could
assist with increasing transparency
and accountability to the public. Other
strategies for improving data sharing
could include comparing and merging
EMS and hospital data with police and
other relevant agency records to better
inform policies, projects, programs and
needed data quality improvements.
Equity variables could be evaluated to
document potential inequities related to
homelessness, race/ethnicity, language,
and income to guide policy for addressing
disproportionate trauma and fatalities.
Fatal Crash Response Team
In the event of a traffic fatality, analysis and
evaluation is a key towards addressing
the burden of traffic mortality and tracking
progress towards eliminating fatalities
on Richmond’s roads. One strategy is to
establish a cross-agency fatal crash team
of EMS, police, transportation, public
health, and City officials to convene at
the crash site after a fatal crash. This
would assist with accurate investigation
and documentation of potentially
relevant infrastructural and environmental
crash factors, while identifying other
additional response factors that may have
contributed to the fatal crash outcome.
Richmond Local Roadway Safety Plan
43 Emerging Technology
Recent advancements in transportation
technology have not only introduced
new modes and travel patterns but
have also presented opportunities to
better understand travel behavior and
encourage safe behavior. The proliferation
of new mobility devices, services and
technologies (e.g. ride-hailing services)
have presented numerous needs and
options for addressing road safety.
Among these new technologies, artificial
intelligence allows for more detailed
data collection and the proliferation of
autonomous vehicle (AV) usage. AVs
have potential to reduce human error
and improve street safety, but AVs also
incur different challenges. The following
represent a summary of emerging
technology trends related to safety.
Data Collection and Management
Up-to-date data on transportation
infrastructure, including roadway
characteristics, intersection
characteristics, and signs, is valuable
for planning and implementing future
improvements. Service providers that
can assist with this work include:
• Mapillary, uses crowdsourced or
privately provided street level imagery
to extract and map signs, street
lamps, sidewalks, signals, and other
objects. https://www.mapillary.com/
• EcopiaTech uses satellite imagery
to extract features such as road
centerlines, roadway cross-
sections, sidewalks, and more.
https://www.ecopiatech.com/
Smart Signal Technology
As part of its strategy to bolster road
safety, Richmond could explore the
feasibility of deploying smart signal
technology on its roads. Smart signal
technology enables cities to collect data
along multiple intersections, providing
high-resolution data on how people are
using the roadway in real time. Connected
vehicles are another part of this system.
They wirelessly communicate with
other vehicles and infrastructure (like
signals) to provide data for instantaneous
decision-making (e.g. reporting driver
speed or collisions). Data from signals
in combination with data from vehicles
can allow for real time speed-related
signal operations, allowing for enhanced
safety through adaptable systems.
AV Readiness Planning
Having strategies prepared to meet
and address the oncoming challenges
posed by AV technology will be crucial
in advancing road safety in Richmond.
Fully automated vehicles have the
potential to transform travel behavior
and safety outcomes given that AVs are
ultimately designed to operate without any
human intervention. Some strategies for
preparation include educating the public
on current and future safety features
and limitations, developing signing
and striping standards, and conducting
reviews of equity implications. Without
appropriate research and guidance,
AVs could widen accessibility and safety
gaps for vulnerable communities.
Near Miss Data
Near misses have historically been
difficult to study in practical safety
applications due to an overall lack of
reported information. In the absence
of sufficient crash data, near miss data
is an important indicator for guiding
crash prevention. There are several
technologies detailed below that are
closing the gap and providing key
safety insights regarding near misses:
• Video Data: Video machine learning
is an effective means of classifying
collisions and collecting near miss
data. The City should consider
investing in these technologies
(e.g. along key roadways and
intersections) to proactively
enact safety countermeasures.
• Incidence Data from Connected
Vehicles: With the capability of
vehicles to capture and transmit
real-time data on driver behavior
wirelessly, these data are
increasingly becoming an integral
part of reporting near misses
especially given the introduction
of AVs on public roadways.
• Public Crowdsourcing: Online web
crowdsourcing platforms, like UC
Berkeley’s SafeTREC Street Story tool,
allow anyone to anecdotally report
incidents of near misses. These data
are available publicly for analysis
and contain important contextual
information based on geographic
location (e.g. road conditions, street
lighting and travel mode). Utilizing a
platform like Street Story could also
advance community education and
engagement around road safety.
EMERGING TECHNOLOGY
Chapter 2: Vision and Goals
44 The twelve emphasis areas are a combination
of four priority corridors and eight collision
profiles that were identified based on the number
of total collisions, number of fatal and severe
injury (KSI) collisions, and stakeholder input
Richmond Local Roadway Safety Plan
45 Emphasis Areas
and Strategies
Chapter 7
The following twelve emphasis areas
are a combination of four priority
corridors and eight collision profiles
that were identified based on the
number of total collisions, number
of fatal and severe injury (KSI)
collisions, and stakeholder input.
Each priority corridor is presented on
a cutsheet that includes a collision
summary, location summary, safety
goals, strategies to help the City
achieve the identified goals, and
relevant grant opportunities.
The location summary for each emphasis
area includes the violations and collision
types that account for the most severe
or highest number of collisions. The
underlying safety analysis and collision
profile details are discussed in Chapter 5.
The strategies, which were selected
to address the collision types and
violations and contribute to achieving
the safety-related goals are identified
as primary countermeasures which
correspond to the factors identified in
the location summary and are best suited
for competitive HSIP grant applications.
Each emphasis area also indicates if the
collisions are located in or near a school,
retail, transit corridor, or park. Proximity
Emphasis Areas
to schools, parks, transit and retail was
defined as within a 1,000 ft radius.
Unit cost estimates represent general
unit costs based on prior Bay Area or
statewide projects, and are not specific
to the location. High-level benefit
estimates assume a collision cost-
based benefit related to all relevant
collisions for a location or collision
type, to allow for an apples-to-apples
comparison of countermeasures. More
information on benefit calculations
can be found in the LRSM, Appendix
D, page A-55. Further engineering
studies will be required to develop
more detailed estimates and designs.
1 23rd Street, Grant Avenue
to Maricopa Avenue
2 23rd Street & 22nd Street Couplet
3 Barrett Avenue, Harbour
Way to 24th Street
4 Cutting Boulevard, Hoffman
Boulevard to Carlson Boulevard
5 Unsafe Speeds
6 Driving Under the Influence
7 Collisions Involving the
15-24 Age Group
8 Stop Sign Violations at Stop-
Controlled Intersections
9 Left Turns at Signalized Intersections
10 Pedestrian Right-
of-Way Violations at
Uncontrolled Crossings
11 Pedestrians Crossing Outside
Crosswalk or Legal Crossings
12 Contraflow Bicycle Riding
Chapter 7: Emphasis Areas and Strategies
46 23rd Street
Countermeasure Issue Area Time Frame Unit Cost
Green Conflict Striping To address Contraflow bicycle riding Short $1,000 per location Advanced Stop Bar To address Pedestrian right-of-way, Not stopping Short $1,000 per location High-visibility Crosswalks To address Pedestrian right-of-way Medium $5,000 per location Pedestrian Hybrid Beacons (or RRFB) To address Pedestrian right-of-way Medium $50,000 per location Class II Bicycle Lanes To address Contraflow bicycle riding Medium $90,000 per mile PHB To address Pedestrian right-of-way Medium $250,000
Road Diet To address Unsafe Speed, Pedestrian right-of-way, Contraflow bicycle riding Medium-Long $80,000 - $50,000 per mile Protected Left-Turn Phasing To address Left-turns Medium-Long $250,000 per intersection Grant Avenue to Maricopa Avenue
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
Relevant Grant
Opportunities
Location
Attributes
HSIP
Collision Summary
59 Total Collisions
5 KSI Collisions
19 Bicycle and Pedestrian Collisions
2 Bicycle and Pedestrian KSI Collisions
PRIORITY CORRIDOR
Location Summary
VIOLATIONS
• Vehicle right-of-
way violation
• Unsafe speed
• Improper turning
• Pedestrian right-of-
way violation
• Wrong side of road
• Driving or under the
influence of alcohol or drug
COLLISION TYPES
• Broadside
• Rear end
• Vehicle-Pedestrian
• Head-on
ROADWAY & CONTEXTUAL
FACTORS
• 4-lane road with
parking, no median
• 30-35 mph speed limit
• Multiple offset intersections
Goals
• Reduce vehicle speeds throughout the corridor
• Increase pedestrian visibility with enhanced striping and signage, especially near schools and parks
• Reduce frequency of intersection conflicts, particularly left-turn conflicts, using traffic control and intersection enhancements
• Create consistency with the three-lane portion of the road in City of San Pablo • Continue to build out bicycle network
ATP
OTHER
OTS
Richmond Local Roadway Safety Plan
47 MARICOPA AVE
23RD ST
COALINGA AVE
HUMPHREY AVE
LINCOLN AVE
GRANT AVE
GAYNOR AVE
23rd Street, Grant Avenue
to Maricopa Avenue
In December 2021 the Contra Costa Transportation
Authority (CCTA) published a City of Richmond
Complete Streets Safety Assessment. Where
noted, CSSA recommendations should
be implemented to improve safety.
In May 2018 a draft 23rd Street Streetscape Plan
was developed. Implementation of this plan would
include the elements listed here and would further
Richmond’s safety goals for this corridor, including
improving the ability for bicyclists and pedestrians to cross 23rd Street on intersecting bicycle boulevards.
Whole-Corridor Improvements
• Implement a road diet (4-to-3 lane conversion)
• Install Class 2 bicycle lanes and green
conflict striping at intersections to
provide a separate space for bikes and
reduce conflicts at intersections
Add a new enhanced crosswalk on the
north side of the intersection with 23rd
Street with a median pedestrian refuge
and RRFB
• Enhance the existing
crosswalk and add a median
to help channelize northbound/
southbound turns
• Address left-turn conflicts by
adding a left-turn pocket, protected
left-turn phasing for northbound/
southbound traffic, split phasing
for eastbound/westbound traffic
• Implement pedestrian facility
improvements mentioned
in the CCTA CSSA
• Address left-turn
conflicts by adding
left-turn phasing
for northbound/
southbound traffic
and split phasing for
eastbound/westbound
• Implement pedestrian
facility improvements
mentioned in the
CCTA CSSA
Add new crosswalks
including RRFBs
Enhance the existing
crosswalk including a
median refuge and RRFBs
Enhance
the existing
crosswalk
with median
pedestrian
refuge and
RRFBs
Enhance the existing
crosswalk and add
new crossings at this
intersection
Chapter 7: Emphasis Areas and Strategies
48 23rd Street & 22nd Street Couplet
Location Summary
VIOLATIONS
• Traffic signals and signs
• Unsafe speed
• Pedestrian right-of-
way violation
• Improper turning
• Vehicle right-of-
way violation
• Pedestrian violation
• Driving or bicycling
under the influence
of alcohol or drugs
COLLISION TYPES
• Broadside
• Vehicle/Pedestrian
• Rear end
• Head-on
• Sideswipe
ROADWAY &
CONTEXTUAL FACTORS
• 22nd Street: 2-lane
road with parking
• 23rd Street: 3-lane
road with parking
• 30-35 mph speed limit
• Multiple offset intersections
Goals
• Reduce vehicle speeds throughout the corridor
• Increase pedestrian visibility with enhanced striping and signage • Reduce frequency of intersection conflicts, particularly left-turn conflicts, using traffic control and intersection enhancements
• Continue to build out bicycle network
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
105 Total Collisions
4 KSI Collisions
21 Bicycle and Pedestrian Collisions
2 Bicycle and Pedestrian KSI Collisions
PRIORITY CORRIDOR
Countermeasure Issue Area Time Frame Unit Cost
Advanced Stop Bar To address Pedestrian right-of-way, Not stopping Short $1,000 per location Speed Hump or Speed Table To address Unsafe Speed Short-Medium $5,000 per location Pedestrian Hybrid Beacons (or RRFB) To address Pedestrian right-of-way Medium $250,000 per location High-visibility Crosswalks To address Pedestrian right-of-way Medium $5,000 per location Road Diet To address Unsafe Speed, Pedestrian right-of-way, Contraflow bicycle riding Medium-Long $80,000 - $500,000 per mile Protected Left-Turn Phasing To address Left-turns Medium-Long $250,000 per intersection Close Slip Lane To address Unsafe Speed, Pedestrian right-of-way Long $200,000 per location OTS
CARLSON BLVD
NEVIN AVE
23RD ST
BARRETT AVE
ROOSEVELT AVE
BISSELL AVE
ESPEE AVE
Richmond Local Roadway Safety Plan
49 CARLSON BLVD
NEVIN AVE
23RD ST
BARRETT AVE
ROOSEVELT AVE
BISSELL AVE
ESPEE AVE
23rd Street & 22nd Street Couplet
In December 2021 the Contra Costa Transportation Authority (CCTA) published a City of Richmond Complete Streets
Safety Assessment. Where noted, CSSA recommendations
should be implemented to improve safety.
A draft 23rd Street Streetscape Plan was developed in May 2018.
Implementation of this plan would include the elements listed here and would further Richmond’s safety goals for this corridor.
Many of the elements listed in the plan can be implemented independently of a conversion of the corridor into two-way streets.
Whole-Corridor Improvements
• Convert 22nd Street and 23rd Street from one-
way to two-way streets and include Class 2
bicycle lanes on each side of both streets
Add a speed hump on
the approach to Roosevelt
Avenue, prior to the
connection with 22nd Street
Close the left-turn slip lane,
enlarge the raised median and
add a new crossing which uses
the median as a pedestrian refuge
• Address left-turn conflicts
by adding left-turn pockets
on the eastbound/westbound
approaches and protected
left-turn phasing
• Implement the
Macdonald/22nd Street
pedestrian facility
improvements mentioned
in the CCTA CSSA
Tie in 22nd Street to
Carlson Boulevard
and close the existing
connection via the
underpass to Ohio Avenue
Enhance existing crosswalk with
median pedestrian refuge and
RRFB
Chapter 7: Emphasis Areas and Strategies
50 Barrett Avenue
Location Summary
VIOLATIONS
• Traffic signals and signs
• Vehicle right-of-
way violation
• Improper turning
• Pedestrian right-of-
way violation
• Unsafe speed
• Driving or bicycling
under the influence
of alcohol or drug
• Pedestrian violation
COLLISION TYPES
• Broadside
• Vehicle/Pedestrian
• Rear end
• Sideswipe
• Head-on
ROADWAY & CONTEXTUAL
FACTORS
• 4-to-5-lane road with parking
and partial raised median
• 30-35 mph speed limit
• Discontinuous bicycle facilities
• Train (BART and UPRR/
Amtrak) overpass
Goals
• Reduce vehicle speeds throughout the corridor
• Prevent use of turning lanes as through lanes
• Slow and channelize traffic through the undercrossing • Create consistency with the three-lane portion of the road to the east • Continue to build out the bicycle network by closing a gap in a crosstown bike route
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
109 Total Collisions
4 KSI Collisions
23 Bicycle and Pedestrian Collisions
2 Bicycle and Pedestrian KSI Collisions
Harbour Way to 24th Street PRIORITY CORRIDOR
Countermeasure Issue Area Time Frame Unit Cost
Advanced Stop Bar To address Pedestrian right-of-way, Not stopping Short $1,000 per location Speed Hump or Speed Table To address Unsafe Speed Short-Medium $5,000 per location High-visibility Crosswalks To address Pedestrian right-of-way Medium $5,000 per location Road Diet To address Unsafe Speed, Pedestrian right-of-way, Contraflow bicycle riding Medium-Long $80,000 - $500,000 per mile Protected Left-Turn Phasing To address Left-turns Medium-Long $250,000 per intersection OTS
Richmond Local Roadway Safety Plan
51 BARRETT AVE
HARBOUR WAY
12TH ST
BARRETT AVE
23RD ST
20TH ST
18TH ST
Barrett Avenue, Harbour Way to 24th Street
In December 2021 the Contra Costa Transportation
Authority (CCTA) published a City of Richmond Complete
Streets Safety Assessment. Where noted, implement
these CSSA recommendations to improve safety.
Whole-Corridor Improvements
• Implement a road diet throughout the corridor (to match lane configurations east of 24th Street) and implement
raised medians at all intersections along the corridor to discourage use of the two-way turn lane as a passing lane • Enhance the existing
crosswalk with
median and RRFB
• Implement pedestrian facility
improvements mentioned
in the CCTA CSSA
• Remove one through lane in each direction to
accommodate a bicycle lane (buffered or protected
where possible)
• Add channelizers and striping on approach to 18th
Street, remove eastbound right-turn lane and add a left- turn lane
• Widen sidewalks through the underpass. Currently,
sidewalks are only provided on the north side.
• Implement the roadway,
bicycle and pedestrian facility
improvements mentioned
in the CCTA CSSA
• Convert the southernmost
eastbound lane to a
right-turn only lane
Address left-turn conflicts
and enhance crossings
per recommendations
provided for the 22nd
Street & 23rd Street
Couplet
Add new enhanced
crosswalks to the
eastern leg of the 19th
Street intersection and
western leg of 21st Street
intersection
Chapter 7: Emphasis Areas and Strategies
52 Cutting Boulevard
Location Summary
VIOLATIONS
• Vehicle right-of-
way violation
• Traffic signs and signals
• Improper turning
• Driving under the influence
of alcohol or drug
• Following too closely
• Pedestrian violation
• Wrong side of road
COLLISION TYPES
• Broadside
• Vehicle/pedestrian
• Rear end
• Sideswipe
• Head-on
ROADWAY &
CONTEXTUAL FACTORS
• 4-to-5-lane road with
parking and partial
raised median
• 30-35 speed limit
• Multiple unsignalized,
unenhanced crossings and
areas absent safe crossings
• Railroad crossing adjacent
high-traffic intersection
Goals
• Reduce vehicle speeds throughout the corridor
• Provide separate and protected facilities for people who walk and bike • Improve visibility of bicyclists and pedestrians at intersections • Encourage multimodal transportation with multimodal infrastructure and lower vehicle speeds • Continue to build out bicycle network
• Coordinate improvements with the proposed grade crossing improvement on Cutting Boulevard at Carlson Boulevard.
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
90 Total Collisions
12 KSI Collisions
22 Bicycle and Pedestrian Collisions
5 Bicycle and Pedestrian KSI Collisions
Hoffman Boulevard to Carlson Boulevard PRIORITY CORRIDOR Countermeasure Issue Area Time Frame Unit Cost
Advanced Stop Bar To address Pedestrian right-of-way, Not stopping Short $1,000 per location Speed Hump or Speed Table To address Unsafe Speed Short-Medium $5,000 per location High-visibility Crosswalks To address Pedestrian right-of-way Medium $5,000 per location Road Diet To address Unsafe Speed, Pedestrian right-of-way, Contraflow bicycle riding Medium-Long $80,000 - $500,000 per mile Median Refuge To address Pedestrian Crossing Medium-Long $25,000 per location Close Slip Lane To address Unsafe Speed, Pedestrian right-of-way Long $200,000 per location OTS
Richmond Local Roadway Safety Plan
53 CUTTING BLVD
HO
FFM A N B L V D
HARBOUR WAY S
MARINA WAY S
MARINA BAY PKWY
CARLSON BLVD
S 23RD ST
CUTTING BLVD
Cutting Boulevard, Hoffman Boulevard to Carlson Boulevard Whole-Corridor Improvements
• Implement a road diet (5-to-3 lanes) throughout the corridor and install protected bicycle lanes buffered either by parking or constructed barriers • Add new enhanced crosswalks to 12th, 15th, 18th
and 21st Streets and enhance existing crosswalks
at Marina Way S, 17th and 20th Streets
• Coordinate the location of crosswalks
with existing transit facilities
Remove parking or
implement road diet to
accomodate protected
bicycle facilities
• Remove parking or implement road diet to accommodate protected bicycle facilities
• Maintain the raised median throughout this corridor segment • Enhance existing crosswalks at 23rd, 24th, 26th, 29th and 31st Streets with pedestrian refuges, RRFBs or PHBs
• Remove the third westbound
lane and install separated
bikeways in both directions
• Raise the existing striped
median through S 9th Street
• Maintain the road diet on
approach to the intersection
• Implement the roundabout
from the City of Richmond
Pedestrian Master Plan
• Install bicycle facilities across all
legs of the intersection and complete
bikeway connections to existing
facilities east of Stege Avenue and
future facilities on Carlson Boulevard
Square-up
bikeway
crossings of
the railroad
tracks
Remove the third eastbound
and westbound lanes and
install protected bicycle
lanes
Chapter 7: Emphasis Areas and Strategies
54 Unsafe Speeds
Location Summary
VIOLATIONS
• Unsafe speed
COLLISION TYPES
• Rear end
• Hit object
• Broadside
• Head-on
• Sideswipe
• Overturned
• Vehicle/pedestrian
ROADWAY &
CONTEXTUAL FACTORS
• Citywide issue
Goals
• Reduce vehicle speeds through roadway design
• Improve visibility of people who walk and bike, particularly at intersections • Encourage slower speeds via education and enforcement, including development of neighborhood slow zones, and Safe Routes to Schools
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
297 Total Collisions
29 KSI Collisions
18 Bicycle and Pedestrian Collisions
6 Bicycle and Pedestrian KSI Collisions
COLLISION PROFILE
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
Countermeasure Time Frame Unit Cost
Radar Speed Feedback Signs Short $10,000 per location
Speed Hump or Speed Table Short-Medium $5,000 per location Road Diet Medium-Long $80,000 - $500,000 per mile
Close Slip Lane Long $200,000 per location
OTS
Richmond Local Roadway Safety Plan
55 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (29)
All Other Collisions (268)
Unsafe Speeds
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Chapter 7: Emphasis Areas and Strategies
56 Driving Under the Influence
Location Summary
VIOLATIONS
• Driving or bicycling
under the influence
of alcohol or drug
COLLISION TYPES
• Broadside
• Rear end
• Hit object
• Sideswipe
• Head-on
• Vehicle/Pedestrian
• Overturned
ROADWAY &
CONTEXTUAL FACTORS
• Citywide issue
Goals
• Reduce the severity of collisions caused by driving under the influence with roadway design • Reduce driving under the influence with enforcement and partnerships Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
Collision Summary
108 Total Collisions
14 KSI Collisions
4 Bicycle and Pedestrian Collisions
2 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Countermeasure Time Frame Unit Cost
Extended Y ellow and All Red Time Short $500 per location Impact Attenuators Medium $50,000 each
Median Barrier Medium $75 per linear foot
Guardrail Medium $50 per linear foot
Edgeline Rumble Strips Medium $50 per linear foot
Intersection Lighting Long $30,000 per intersection
Roadway Lighting Long $10,000 per light
OTHER
OTS
Richmond Local Roadway Safety Plan
57 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_DUI
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (14)
All Other Collisions (94)
Driving Under the Influence
Chapter 7: Emphasis Areas and Strategies
58 Collisions Involving the 15-24 Age Group
Location Summary
VIOLATIONS
• Vehicle right-of-way violation
• Unsafe speed
• Traffic signals and signs
• Improper turning
• Driving or bicycling under the
influence of alcohol or drug
• Wrong side of road
• Pedestrian right-of-way violation
• Pedestrian violation
COLLISION TYPES
• Broadside
• Rear end
• Head-on
• Sideswipe
• Vehicle/pedestrian
• Hit object
ROADWAY &
CONTEXTUAL
FACTORS
• Citywide issue
Goals
• Increase the visibility of intersection signs and signals and pedestrian crossings • Reduce speeds via roadway design, particularly near schools and high-traffic areas • Encourage safe behavior with community-wide sustained outreach safety campaigns and targeted outreach
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
OTS
Collision Summary
498 Total Collisions
41 KSI Collisions
72 Bicycle and Pedestrian Collisions
11 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Non-Engineering Countermeasure Time Frame* Cost*
Safe Routes to Schools Program Short $
Public Information Campaigns Medium $$
Y outh Education Medium $$
* These estimates do not include the costs of enacting legislation or establishing policies.
Richmond Local Roadway Safety Plan
59 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_age
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (41)
All Other Collisions (457)
Collisions Involving the
15-24 Age Group
Chapter 7: Emphasis Areas and Strategies
60 Stop Sign Violations at Stop-Controlled intersections Location Summary
VIOLATIONS
• Traffic signals and signs
COLLISION TYPES
• Broadside
• Sideswipe
• Head-on
• Vehicle/pedestrian
• Overturned
ROADWAY &
CONTEXTUAL FACTORS
• All-way or two-way
(i.e., side-street) stop-
controlled intersections
• School zones (or
intersections near schools)
Goals
• Slow vehicle speeds throughout the corridor and reduce the occurrence of broadside collisions
• Increase driver awareness of intersections, sign and signal controls with enhanced warning signs and by enhancing signal visibility
• Reduce stop sign violations through improved enforcement.
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
103 Total Collisions
13 KSI Collisions
18 Bicycle and Pedestrian Collisions
1 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Countermeasure Time Frame Unit Cost
Advanced Warning Signs Short $1,500 per location
Road Diet Medium-Long $80,000 - $500,000 per mile
Bulbouts Medium-Long $50,000 per corner
OTS
Richmond Local Roadway Safety Plan
61 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_stopsign
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (13)
All Other Collisions (90)
Stop Sign Violations at Stop-
Controlled intersections
Chapter 7: Emphasis Areas and Strategies
62 Left Turns at Signalized Intersections
Location Summary
VIOLATIONS
• Vehicle right-of-
way violation
COLLISION TYPES
• Broadside
• Head-on
• Sideswipe
• Hit object
• Not stated
• Vehicle/Pedestrian
ROADWAY &
CONTEXTUAL FACTORS
• Signalized intersections
lacking a left-turn phase
Goals
• Reduce number and severity of left-turn collisions at signalized intersections • Reduce number and severity of broadside collisions at signalized intersectionsRelevant Grant Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
49 Total Collisions
3 KSI Collisions
5 Bicycle and Pedestrian Collisions
0 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Countermeasure Time Frame Unit Cost
Protected Left-turn Phasing Medium-Long $250,000 per intersection Raised Median Medium-Long $150 per linear foot
OTS
Richmond Local Roadway Safety Plan
63 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_LT
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (3)
All Other Collisions (46)
Left Turns at Signalized
Intersections
Chapter 7: Emphasis Areas and Strategies
64 Pedestrian Right-of-Way Violations at Uncontrolled Crossings Location Summary
VIOLATIONS
• Pedestrian right-
of-way violation
COLLISION TYPES
• Vehicle/Pedestrian
• Sideswipe
• Broadside
• Not stated
ROADWAY & CONTEXTUAL
FACTORS
• Uncontrolled crossings, two-
way stop-controlled crossings
and midblock crossings
• Multilane roadways (more than
one lane in each direction)
• Nighttime and/or low-light conditions
Goals
• Provide separate and protected facilities for people who walk • Increase visibility for people who drive and walk at night with intersection, roadway and pedestrian lighting
• Reduce pedestrian exposure to vehicle traffic by upgrading or filling gaps in facilities such as sidewalks and crosswalks
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
39 Total Collisions
8 KSI Collisions
39 Bicycle and Pedestrian Collisions
8 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION
PROFILE
Countermeasure Time Frame Unit Cost
Pedestrian Hybrid Beacons (or RRFB) Medium $50,000
PHB Medium $250,000
High-visibility Crosswalk Medium $5,000 per location
Bulbouts Medium-Long $50,000 per corner
Median Refuge Medium-Long $25,000 per location
Road Diet Medium-Long $80,000 - $500,000 per mile
OTS
Richmond Local Roadway Safety Plan
65 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_pedROW
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (8)
All Other Collisions (31)
Pedestrian Right-of-
Way Violations at
Uncontrolled Crossings
Chapter 7: Emphasis Areas and Strategies
66 Pedestrians Crossing Outside Crosswalk or Legal Crossings Location Summary
VIOLATIONS
• Pedestrian violation
COLLISION TYPES
• Vehicle/Pedestrian
• Head-on
• Sideswipe
• Not stated
• Other
ROADWAY &
CONTEXTUAL FACTORS
• Outside of a crosswalk
or legal crossing (marked
and unmarked crosswalk)
• Midblock or along
roadway shoulder
Goals
• Reduce pedestrian exposure to vehicular traffic by upgrading or filling in gaps in facilities such as sidewalks and crosswalks
• Improve sight distance and/or visibility between motor vehicles and pedestrians • Reduce vehicle speeds
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
32 Total Collisions
7 KSI Collisions
32 Bicycle and Pedestrian Collisions
7 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Countermeasure Time Frame Unit Cost
Median Barricades Medium $50 per linear foot
High-visibility Crosswalk Medium $5,000 per location
Road Diet Medium-Long $80,000 - $500,000 per mile
Roadway Lighting Long $10,000 per light
OTS
Richmond Local Roadway Safety Plan
67 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_crossing
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (7)
All Other Collisions (25)
Pedestrian Crossing
Outside Crosswalk
or Legal Crossings
Chapter 7: Emphasis Areas and Strategies
68 Contraflow Bicycle Riding
Location Summary
VIOLATIONS
• Wrong side of road
COLLISION TYPES
• Broadside
• Head-on
• Sideswipe
ROADWAY & CONTEXTUAL
FACTORS
• Multiple-lane roadways
• 30-35 mph speed limit
• No dedicated bicycle facilities
Goals
• Reduce bicyclist exposure to vehicular traffic by upgrading or filling gaps in facilities such as bicycle lanes
• Improve sight distance and/or visibility between motor vehicles and bicyclists, particularly at intersections
Relevant Grant
Opportunities
Location
Attributes
HSIP
ATP
OTHER
Collision Summary
24 Total Collisions
2 KSI Collisions
24 Bicycle and Pedestrian Collisions
2 Bicycle and Pedestrian KSI Collisions
NEAR SCHOOL
NEAR RETAIL
NEAR PARK
NEAR TRANSIT
COLLISION PROFILE
Countermeasure Time Frame Unit Cost
Green Conflict Striping Short $1,000 per location
Class II Bicycle Lanes Medium $90,000 per mile
Road Diet Medium-Long $80,000 - $500,000 per mile
Separated Bikeway Long $1,250,000 per mile
OTS
Richmond Local Roadway Safety Plan
69 Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_contraflow
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Collision Profiles
Barrett Ave
S37thSt
Cutting Blvd
Rheem Ave
S Garrard Blvd
Macdonald Ave
W Barrett Ave
Ohio Ave
MarinaBayPkwy
ParkCentral
DornanDr
McBryde Ave
23rd St
13th St
Garvin Ave
Central Ave
Chevron Way
Bayview Ave
Marina Way
Harbour Way
Regatta Blvd
S 23rd St
MeadeSt
Richmond Pkwy
Castro St
Solano Ave
Brickyard Cove Rd Carlson Blvd
Atlas Rd
Hilltop Dr
MorningsideDr
Hoffman Blvd
CanalBlvd
S Harbour Way
Cerrito Ave
BlumeDr
Parr Blvd
Shane Dr
Amend Rd
Markovich Lane
El Portal Dr
Moyers Rd
Full Moon Dr
Juliga Woods St
GiantHighway
Potrero Ave
Fred Jackson Way
Peninsula Dr
22nd St
San Pablo Dam Rd
May Rd
S 2nd St
Hilltop Mall Rd
S55thSt
6th St
Seacliff Dr
LakesideDr
KeyBlvd
29th St
7th St
SanPabloAve
CastroRanch Rd
·123
%&580
!"80
0 0.7 1.3 20.3
Miles
CollisionProfile_speed
Fatal
Injury (Severe)
Injury (Other Visible)
Complaint of Pain
Fatal and Severe Collisions (2)
All Other Collisions (22)
Contraflow Bicycle Riding
Chapter 2: Vision and Goals
70 While many safety projects will perform well in the HSIP process, others may be successfully funded through
other sources that consider additional factors such as
increasing walking and biking, improving accessibility, and making the transportation system more equitable
Richmond Local Roadway Safety Plan
71 Evaluation and
Implementation
Chapter 8
While a major goal of the Local
Roadway Safety Plan is to prepare
the City of Richmond to submit
successful Highway Safety
Improvement Program (HSIP)
applications, safety projects can
be funded through a wide range of
additional sources at the regional,
state, and federal levels. HSIP funds
are largely awarded based on a
benefit/cost analysis using a set of
Caltrans-approved countermeasures
with documented collision reduction
factors and historic collision data.
While many safety projects will
perform well in the HSIP process,
others may be successfully funded
through other sources that consider
additional factors such as increasing
walking and biking, improving
accessibility, and making the
transportation system more equitable.
Funding Opportunities
The sources in this chapter may be used
to fund a broad scope of projects targeting
air quality and sustainability, affordable
housing, and transportation. Successful
projects often entail creative solutions
that address impact areas beyond
transportation safety alone, but that
can include, and often benefit from, the
countermeasures identified in this report.
Local, regional, state and federal funding
opportunities relevant to LRSP projects
are listed on the following pages.
Where possible, details about upcoming
funding application cycles are provided,
however, many of these are in flux due
to impacts from the ongoing Covid-19
pandemic. We recommend that the City
of Richmond periodically review this list
and check for updates regarding funding
availability until funding cycles stabilize.
Local and Regional Sources
Contra Costa County Measure J Funding
Administered through the Contra
Costa Transportation Authority (CCTA),
Measure J provides funding for
countywide and local transportation
projects in Contra Costa County.
Frequency: Apportioned annually by CCTA
Developer Fees
California law allows local governments to
establish and charge a fee on residential
and non-residential developments to fund
public facilities and to service population
growth. Public facility fees can be charged
to new development based on density and
traffic impacts, and can go to a variety of
public facilities, one being local roadways.
Frequency: Not applicable
Chapter 8: Evaluation and Implementation
72 Lifeline Transportation Program
The Metropolitan Transportation
Commission (MTC) has created the Lifeline
Transportation Program to evaluate state
and federal funds to provide grants for
mobility and accessibility needs in low-
income communities across the Bay Area.
New guidelines are established for each
cycle and the projects must address
transportation gaps or barriers identified
in community-based transportation
plans or other local planning efforts
in low-income neighborhoods.
Frequency: Biennial funding cycle
Program for Arterial System
Synchronization (PASS)
PASS delivers financial and technical
assistance to cities and counties to
enhance signal coordination across
jurisdictions. This includes engineering
help for local governments seeking to re-
time signals, adjustments to existing traffic-
responsive timing systems, “flush” plans
for managing traffic incidents, and more.
Frequency: Annual funding cycle
Transportation Development Act
Article 3 (TDA3) Funding
Administered through the Metropolitan
Transportation Committee (MTC), TDA3
provides funding annually for bicycle
and pedestrian projects. Each county
coordinates a consolidated annual request
for projects to be funded in the county.
Some counties competitively select
projects, while other counties distribute the
funds to jurisdictions based on population.
Frequency: Annual funding cycle
State Sources
Active Transportation Program (ATP)
ATP is a statewide competitive grant
application process with the goal of
encouraging increased use of active
modes of transportation. The ATP
consolidates existing federal and state
transportation programs, including the
Transportation Alternatives Program
(TAP), Bicycle Transportation Account
(BTA), and State Safe Routes to School
(SRTS), into a single program with a
focus to make California a national
leader in active transportation. The ATP
is administered by the Division of Local
Assistance, Office of State Programs.
Frequency: Biennial funding cycle
Next funding opportunity: Cycle 7 timeline
yet to be announced; likely summer 2024.
California Natural Resources Agency
Environmental Enhancement and
Mitigation (EEM) Program
This program supports projects
that “contribute to mitigation of the
environmental effects of transportation
facilities.” According to the program
guidelines, projects that fall under the
following category can apply: “Mitigation
Projects Beyond the Scope of the Lead
Agency responsible for assessing the
environmental impact of the proposed
transportation improvement.”
Frequency: Annual funding cycle
California Natural Resources
Agency Urban Greening Program
This program supports projects that
“use natural systems or systems that
mimic natural systems to achieve
multiple benefits.” Eligible projects
include “Non-motorized urban trails
that provide safe routes for travel
between residences, workplaces,
commercial centers, and schools.”
Frequency: Biennial funding cycle
Next funding opportunity: Round 5 timeline
yet to be announced; likely spring 2024.
Richmond Local Roadway Safety Plan
73 California Office of Traffic
Safety (OTS) Grant Program
OTS administers traffic safety grants in
the following areas: Alcohol Impaired
Driving, Distracted Driving, Drug-Impaired
Driving, Emergency Medical Services,
Motorcycle Safety, Occupant Protection,
Pedestrian and Bicycle Safety, Police Traffic
Services, Public Relations, Advertising,
and Roadway Safety and Traffic Records.
This funding is primarily geared to
enforcement and outreach efforts.
Frequency: Annual funding cycle
Next funding opportunity: FY 2024
application materials and workshops will
be announced December 2022; grant
applications are due January 31, 2023.
California Strategic Growth Council
(SGC) Transformative Climate
Communities (TCC) Program
The Transformative Climate Communities
(TCC) Program empowers the
communities most impacted by pollution
to choose their own goals, strategies,
and projects to reduce greenhouse
gas emissions and local air pollution.
Frequency: Annual funding cycle
Next funding opportunity: Round 5 timeline yet
to be announced; likely spring/summer 2024.
Caltrans Strategic Partnerships Grants
These grants, a subset of Caltrans’
Sustainable Transportation Planning
Grant Program, fund multi-modal
planning studies, with a focus on transit,
of regional, interregional, and statewide
significance. Studies are conducted
in partnership with Caltrans and must
assist in achieving the Caltrans Mission
and Grant Program Objectives.
Frequency: Annual funding cycle
Next funding opportunity: FY 2023/2024
application period yet to be announced.
Clean California
The Clean California Local Grant Program
(CCLGP), operated by Caltrans, was
created by AB 149 in 2021 to beautify and
clean up local streets and roads, tribal
lands, parks, pathways, transit centers,
and other public spaces. The program
will allocate $296 million in state funds, in
grants not to exceed $5 million, to local
and regional public agencies that install
beautification measures and art in public
spaces and remove litter and debris to
enhance communities and improve spaces
for walking and recreation. The goals of
the CCLGP are to: reduce the amount of
waste and debris within public rights-of-
way, pathways, parks, transit centers, and
other public spaces; enhance, rehabilitate,
restore, or install measures to beautify and
improve public spaces and mitigate the
urban heat island effect; enhance public
health, cultural connection, and community
placemaking by improving public spaces
for walking and recreation; and advance
equity for underserved communities.
Frequency: three-year cycle
Next funding opportunity: Cycle 2 timeline
yet to be announced; likely winter 2024.
Highway Safety Improvement
Program (HSIP)
California’s Local HSIP focuses on
infrastructure projects with nationally
recognized crash reduction factors (CRFs).
Local HSIP projects must be identified
based on collision experience, collision
potential, collision rate, or other data-
supported means. There are opportunities
to include systemic safety projects as well.
Frequency: Annual funding cycle
Next funding opportunity: HSIP Cycle
11 application deadline yet to be
announced; likely due fall 2022.
SB 1 Local Partnership Program (LPP)
The purpose of this program is to provide
local and regional transportation agencies
that have passed sales tax measures,
developer fees, or other imposed
transportation fees with a continuous
appropriation of $200 million annually from
the Road Maintenance and Rehabilitation
Account to fund road maintenance and
rehabilitation, sound walls, and active
transportation projects. There is also a
competitive grant portion of this project.
Frequency: Biennial funding cycle
Next funding opportunity: 2022 program
guidelines available summer 2022;
applications due winter 2022.
Chapter 8: Evaluation and Implementation
74 SB 1 Local Streets and
Roads Program (LSRP)
SB 1 dedicated approximately $1.5
billion per year in new formula
revenues apportioned by the State
Controller to cities and counties for
basic road maintenance, rehabilitation,
and critical safety projects on the
local streets and roads system.
Frequency: Annual funding cycle
Next Funding Opportunity: Eligible
project lists due Summer-Fall 2022.
SB 1 Solutions for Congested
Corridors Program (SCCP)
The Solutions for Congested Corridors
Program funds projects designed to
reduce congestion in highly traveled
and highly congested corridors. This
statewide, competitive program makes
$250 million available annually for projects
that implement specific transportation
performance improvements and are part
of a comprehensive corridor plan by
providing more transportation choices
while preserving the character of local
communities and creating opportunities
for neighborhood enhancement.
Frequency: Annual funding cycle
Next funding opportunity: Cycle 3
(FY 2023/2024) program guidelines
available summer/fall 2022;
applications due winter 2022.
SB 1 State Transportation
Improvement Program (STIP)
The State Transportation Improvement
Program (STIP) is the biennial five-year
plan for future allocations of certain state
transportation funds for state highway
improvements, intercity rail, and regional
highway and transit improvements.
Frequency: Biennial funding cycle
Next funding opportunity: 2024 cycle
funding estimate and program details
likely to be released Summer 2023.
SGC Affordable Housing and Sustainable
Communities (AHSC) Program
The Affordable Housing and Sustainable
Communities (AHSC) Program makes
it easier for Californians to drive
less by making sure housing, jobs,
and key destinations are accessible
by walking, biking, and transit.
Frequency: Annual funding cycle
Next funding opportunity: Round 7
applications due February 2023.
Richmond Local Roadway Safety Plan
75 Federal Sources
Community Development Block
Grant (CDBG) Program
The Community Development Block
Grant (CDBG) program is a flexible
program that provides communities with
resources to address a wide range of
unique community development needs.
Communities often use CDBG funds to
construct and repair streets and sidewalks.
Frequency: Annual funding cycle
Next funding opportunity: Housing
and Community Development program
application cycle yet to be announced;
likely January-February 2023.
Congestion Mitigation and Air Quality
(CMAQ) Improvement Program
The FAST Act continued the CMAQ
program to provide a flexible funding
source to State and local governments
for transportation projects and programs
to help meet the requirements of the
Clean Air Act. Funding is available to
reduce congestion and improve air
quality for areas that do not meet the
National Ambient Air Quality Standards for
ozone, carbon monoxide, or particulate
matter (nonattainment areas) and for
former nonattainment areas that are now
in compliance (maintenance areas).
Frequency: Annual funding cycle
Next funding opportunity: Funding
apportioned via metropolitan planning
organizations (MPOs) based on a formula.
Rebuilding American Infrastructure
with Sustainability and Equity (RAISE)
Discretionary Grant Program
This program supports projects that are
“road or bridge projects eligible under title
23, United States Code;” and “intermodal
projects.” Previously the BUILD grant, this
program replaces the TIGER program.
Frequency: Annual funding cycle
Next funding opportunity: FY 2023 timeline yet
to be announced; likely spring/summer 2023.
Implementation
Considerations
Implementation of the LRSP is a vital
step in the process in which the
identified strategies and projects are
executed. To successfully implement
programs and projects, partnerships,
trust, funding, and coordination need
to be proactively managed. Successful
implementation requires sustained
and coordinated support from key
stakeholders, elected officials, and City
staff. Some strategies are outlined below:
Oversight & Accountability
To ensure effective delivery of safety
projects and programs, establishing
a committee or Task Force with key
officials and stakeholders (in and
outside of the City) that meets bi-
annually or quarterly is recommended.
Having appointed leadership will be a
crucial part of maintaining buy-in and
support for the LRSP from not only
officials, but the community as well.
Leadership could additionally include
members from identified LRSP partners.
Some duties could include conducting
briefings and presentations at board
and agency meetings, collecting and
sharing information on a regular basis,
and updating a public-facing database
(or scorecard) on LRSP goal progress.
Coordination & Partnership
Throughout the lifetime of the LRSP,
coordination and partnership amongst
diverse stakeholders will be essential
for effective delivery of the LRSP. Some
strategies include regularly informing
leaders and stakeholders on progress
and key milestones, consulting partner
agencies early on in the implementation
process to gather suggestions and
feedback, and finding opportunities for
partnership via project bundling (e.g.
integrating LRSP projects with pavement
resurfacing and maintenance).
Funding
One major hurdle to plan implementation is
often funding. As part of an implementation
strategy, it is recommended that the
City stay up to date on potential grant
opportunities and place the most
competitive projects forward as grant
sources evolve. Additionally, review
current capital projects to find where
LRSP elements could overlap for possible
project bundling. See previous section
“Funding Opportunities” for more details.
Chapter 8: Evaluation and Implementation
76 Safety scorecard examples can be
found at the following links:
https://www1.nyc.gov/content/
visionzero/pages/vision-zero-scorecard
https://roadsafetyatwork.ca/tool-
kits/road-safety-snapshot/
Communication
Having continued communication and
transparency with stakeholders and
community members can allow for greater
trust and support of the LRSP’s goals.
Some strategies include communication
across diverse channels (e.g. updated
webpage, news, and social media),
actively addressing community concerns,
publishing updated factsheets on plan
progress, and regular public meetings
using effective community engagement
techniques. An oversight committee or
Task Force (as proposed above) could
aid with leading efforts on communication
and trust-building. The Neighborhood
Councils and/or the Neighborhood
Coordinating Council and the Richmond
Bicycle and Pedestrian Advisory
Committee present key opportunities to
coordinate with Richmond residents.
Evaluation Strategies
Evaluation identifies possible opportunities
to inform future decision-making and
it will allow the City to understand how
it is doing with regards to meeting its
safety goals. It provides the basis for
determining selection of priority areas,
countermeasures, and locations to
reduce crashes (and the harm resulting
from them). Recommendations include:
Update the Plan Regularly
For example, scheduling an update every
two years could assist with organizing
and directing evaluation efforts. As
conditions within the City and County
could change, it will be necessary
to update the LRSP in the future.
Identify Target Metrics and
Measure Goal Performance
in Priority Areas
To understand progress and safety
conditions, several metrics should be
used in LRSP evaluation. Examples of
measuring goal performance include:
• Monitoring collisions, specific to
the goals outlined in this plan
• Monitoring the number of safety
infrastructure improvements installed
Additional regular measurement of
goal progress in priority areas can
be performed every year (e.g. safety
scorecard). Safety scorecards that are
released annually can be a powerful
tool for measuring effectiveness,
highlighting areas that need further
attention and resources, and
identifying tasks and deadlines for
responsible stakeholder parties.
Continue Engagement
of Stakeholders
Efforts around evaluation should
include expanding partnerships from
diverse sources (e.g. officials, agencies,
community advocacy groups). Input from
identified partners and future partners,
along with collected target metrics, could
be used to adapt the plan based on
community feedback and expert insight
as projects and programs are rolled out.
Conduct pre- and post- surveys with
community members to measure how
their actions and views have shifted after
engagement around traffic safety. Local
partners can be tasked with disseminating
the pre- and post-surveys to residents.
Surveys should evaluate whether
respondents express a shift in behavior
after having participated in traffic safety
programming. The metrics for evaluation
can also be developed with local partners
to ensure accessibility for the public.
Richmond Local Roadway Safety Plan
77
Chapter 2: Vision and Goals
78 This page left intentionally blank
Richmond Local Roadway Safety Plan
79 High Injury Networks
Appendix A
Appendix A: High Injury Networks
80 Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
Blume Dr
Hilltop Dr
Ohio Ave
Atlas Rd
21st St
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Pedestrian
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Multimodal
Pedestrian
Corridor opportunities
including non-city maintained
facilities
Pedestrian High
Injury Network
Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
Blume Dr
Hilltop Dr
Ohio Ave
Atlas Rd
21st St
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Pedestrian
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Pedestrian High
Injury Network
64% of all pedestrian-
involved crashes occur
on the City’s pedestrian
High Injury Network,
which accounts for 5% of
Richmond’s roadways
Richmond Local Roadway Safety Plan
81 Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
Bissell Ave
Cutting Blvd
MacDonald Ave
Carlson Blvd
Ohio Ave
37th St
2nd St
18th St
Hilltop Dr
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
Blume Dr
Hilltop Dr
Ohio Ave
Atlas Rd
21st St
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Pedestrian
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Bicycle High
Injury Network
68% of all bicycle-involved
crashes occur on the City’s
bicycle High Injury Network,
which accounts for 5% of
Richmond’s roadways
Multimodal
Bicycle
Corridor opportunities
including non-city maintained
facilities
Bicycle High
Injury Network
Appendix A: High Injury Networks
82 Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
McBryde Ave
Solano Ave
Hilltop Dr
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Klose Way
Richmo
nd Pkwy
Carlson Blvd
San Pablo Dam Rd
San Pablo Ave
Robert Miller Dr
Pennsylvania Ave
Barrett Ave
Cutting Blvd
Garvin Ave7th St
23rd St
Harbour Way S
26th
St
Marina Way S
24th St
22nd St
MacDonald Ave
Lincoln Ave13th St
Rheem Ave
Roosevelt Ave
Richmond Pkwy
Nevin Ave
San Pablo Ave
Blume Dr
Hilltop Dr
Ohio Ave
Atlas Rd
21st St
·123
%&580
!"80
High Injury Network
Figure 5
High Injury Network
Multimodal
Pedestrian
Corridor opportunities on
non-city-maintained facilities
0 0.7 1.3 20.3
Miles
Vehicle High
Injury Network
56% of all motor vehicle-
involved crashes occur
on the City’s vehicle
High Injury Network,
which accounts for 8% of
Richmond’s roadways
Multimodal
Vehicle
Corridor opportunities
including non-city maintained
facilities
Vehicle High
Injury Network
Richmond Local Roadway Safety Plan
83 Countermeasure Toolbox
Appendix B
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects8484 What Y ou'll See in
this Toolbox
Local Roadway
Safety Manual
Many of these countermeasures are
recommended for the 10 emphasis
areas included in this report. Most of
the countermeasures are included in
the 2020 Caltrans Local Roadway Safety
Manual (LRSM) and can be advantageous
for use in Caltrans Highway Safety
Improvement Program (HSIP) grant
funding applications. There are many
effective safety countermeasures
beyond those listed in the LRSM, and
several are included in this toolbox.
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Rumble strips create noise and vibration
inside the vehicle that alert a driver as they
cross the center or edge line. Often this
alert is strong enough to get the attention
of a distracted or drowsy driver, who
can quickly make a corrective steering
action to return to the roadway safely.
Rumble strips also alert drivers to the lane
limits when conditions such as rain, fog,
snow, or dust reduce driver visibility.
Cost $
LRSM ID R30/R31
Crash Reduction Factor 15-20%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
Key Issue
Rumble Strips
Location
Countermeasure Icon
Countermeasure
Issues and Locations
Countermeasure Title
Countermeasure
Description
Countermeasure cost
represented as low ($),
medium ($$), high ($$$); and
the availability of low cost/
quick build alternatives
Countermeasure code in
LRSM, as well as associated
Crash Reduction Factors
and other information
(if applicable)
Additional reference
information (if applicable)
Countermeasure
Category
ENGINEERING
Richmond Local Roadway Safety Plan
85 Bikeways
Solid green paint across an intersection
that signifes the path of the bicycle
crossing. Increases visibility and safety of
bicyclists traveling through an intersection.
Cost $
Low Cost / Quick Build
alternative available
Contraflow Bicycle Riding
Bicycle
Crossing (Solid
Green Paint)
Macdonald Avenue & 23rd Street
Bikeways
Connects bicyclists from the road to
the sidewalk or a shared use path.
Cost $
N/A
Bicycle Ramp
N/A
Bikeways
A traffic signal directing bicycle traffic
across an intersection. Separates
bicycle movements from conficting
motor vehicle, streetcar, light rail, or
pedestrian movements. May be applicable
for Class IV facilities when the bikeway
is brought up to the intersection.
Cost $$$
N/A
Bicycle Signal/
Exclusive
Bike Phase
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 86 Bikeways
A designated area at the head of a
traffic lane at a signalized intersection
that provides bicyclists with a safe and
visible way to get ahead of queuing
traffic during the red signal phase.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S20PB
Crash Reduction Factor 15%
Crash Type All
Bike Box
Contraflow Bicycle Riding
Barrett Avenue & Marina Way
Bikeways
Bike detection is used at signalized
intersections, either through use of
push-buttons, in-pavement loops, or
by video or infrared cameras, to call
a green light for bicyclists and reduce
delay for bicycle travel. Discourages
red light running by bicyclists and
increases convenience of bicycling.
Cost $$
N/A
Bike Detection
N/A
Bikeways
Bike friendly drains avoid placing grating in
the right-of-way that may pose a hazard to
bicyclists by increasing their risk of falling.
Cost $$
Bike-Friendly
Drain
ENGINEERING
Richmond Local Roadway Safety Plan
87 Bikeways
A bike lane provides dedicated street
space, typically adjacent to outer
vehicle travel lanes, with designated
lane markings, pavement legends, and
signage. Bike lanes improve safety by
reducing conflicts between bicycles and
vehicles on the road and by creating
a road-narrowing effect with striping,
which may reduce vehicle speeds.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID R32PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity High
Contraflow Bicycle Riding
Bike Lane
(Class II)
23rd Street
Bikeways
In locations where a bike lane is dropped
due to the addition of a right turn pocket,
the intersection approach may be
restriped to allow for bicyclists to move
to the left side of right turning vehicles
ahead of reaching the intersection.
Cost $
Low Cost / Quick Build
alternative available
Extend Bike
Lane to
Intersection
Contra low Bicycle Riding
22nd Street & 23rd Street
Bikeways
An in-street transit boarding island is used
in conjunction with a Class IV bike facility,
separating transit traffic from bicycle
traffic, reducing confict between the two
modes, and lowering the risk of collision.
Cost $$
Low Cost / Quick Build
alternative available
Contraflow Bicycle Riding, Pedestrian Right-of-Way
Floating
Transit Island
Macdonald Avenue & 23rd Street
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 88 Bikeways
Green conflict striping is green markings
painted in a dashed pattern on bike lanes
approaching an intersection and/or going
through an intersection. Green conflict
striping improves safety by increasing
the visibility bicyclists and identifying
potential conflict points so bicyclists and
motorists use caution when traveling
toward and through an intersection.
Cost $
Low Cost / Quick Build
alternative available
Contraflow Bicycle Riding
Green Conflict
Striping
22nd Street & 23rd Street
Bikeways
A separated bikeway provides dedicated
street space, typically adjacent to
outer vehicle travel lanes, with physical
separation from vehicle traffic, designated
lane markings, pavement legends, and
signage. Physical separation may consist
of plastic posts, parked vehicles, or
a curb. Separated bikeways improve
safety by reducing conflicts between
bicycles and vehicles on the road and
by creating a road-narrowing effect with
buffers or vertical barriers, which may
reduce vehicle speeds. A raised barrier
of plastic posts and painted pavement
is a low-cost/quick build option.
Cost $$$
Low Cost / Quick Build
alternative available
LRSM ID R33PB
Crash Reduction Factor 45%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity High
Contraflow Bicycle Riding, Unsafe Speed
Separated
(Class IV)
Bikeway
Cutting Boulevard
Bikeways
Places a suggested bike lane within
the inside portion of a dedicated motor
vehicle turn lane. Lane markings delineate
space for bicyclists and motorists
within the same lane and indicate the
intended path for bicyclists to reduce
confict with turning motor vehicles.
Cost $
Low Cost / Quick Build
alternative available
N/A
Mixing Zone
N/A
ENGINEERING
Richmond Local Roadway Safety Plan
89 Bikeways
Pavement markings denoting door zone
of parked vehicles to help bicyclists
maintain safe positioning on the roadway
Cost $
Low Cost / Quick Build
alternative available
Contraflow Bicycle Riding, Unsafe Speed
Parking Buffer
Cutting Boulevard
Bikeways
Signs communicate to pedestrians that
bicyclists may also use the sidewalk and
that bicyclists must yield to pedestrians.
Cost $
Low Cost / Quick Build
alternative available
Shared
Sidewalk Sign
Bikeways
This roadway treatment provides bicyclists
with a means of safely making a left turn
at a multi-lane signalized intersection
from a bike lane or cycle track on the
far right side of the roadway. In this way,
bicyclists are protected from the flow of
traffic while waiting to turn. Usage could
be mirrored for right-turns from a one-
way street with a left-side bikeway.
Cost $
Low Cost / Quick Build
alternative available
N/A
Two-Stage
Turn Queue
Bike Box
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 90 Bikeways
Prolongs the green phase when bicyclists
are present to provide additional time
for bicyclists to clear the intersection.
Can occur automatically in the signal
phasing or when prompted with
bicycle detection. T opography should
be considered in clearance time.
Cost $
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Extend Green
Time For Bikes
N/A
Bikeways
A sign placed on roads with lanes that
are too narrow to allow safe side-by-side
passing to indicate that bicyclists may
occupy the full lane. This discourages
unsafe passing by motorists.
Cost $
Low Cost / Quick Build
alternative available
N/A
Bicycles
May Use Full
Lane Sign
N/A
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Rumble strips create noise and vibration
inside the vehicle that alert a driver as they
cross the center or edge line. Often this
alert is strong enough to get the attention
of a distracted or drowsy driver, who
can quickly make a corrective steering
action to return to the roadway safely.
Rumble strips also alert drivers to the lane
limits when conditions such as rain, fog,
snow, or dust reduce driver visibility.
Cost $
LRSM ID R30/R31
Crash Reduction Factor 15-20%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
Rumble Strips
Driving Under the Inf uence
Richmond Parkway
ENGINEERING
Richmond Local Roadway Safety Plan
91 Intersections & Roadways
Centerline hardening is a technique
to make intersections safer for
pedestrians by encouraging drivers
to make left turns at slower speeds.
Cost $
Low Cost / Quick Build
alternative available
Left-Turns
Centerline
Hardening
Cutting Boulevard & S 37th Street
Figure 20. Centerline Hardening
Source: Seattle Department of Transportation (SDOT), https://www. theurbanist.org/2021/05/13/rainier-ave-crosswalks-to-receive- pedestrian-improvements-in-form-of-hardened-centerlines/ Hardened centerlines are bollards that prevent left-
turners from crossing the centerlines to make a turn.
Rubber speed bumps are often used in conjunction with
hardened centerlines and placed in an intersection.
There are a variety of design configurations.
Intersections & Roadways
An all-way stop-controlled intersection
requires all vehicles to stop before
crossing the intersection. An all-way stop
controlled intersection improves safety
by removing the need for motorists,
bicyclists, and pedestrians on a side-street
stop-controlled intersection to cross free-
flowing lanes of traffic, which reduces the
risk of collision. An “ ALL WAY” sign should
be placed under the octagonal stop sign
at all-way stop-controlled intersections
as required by the California Manual on
Uniform Traffic Control Devices (MUTCD).
Cost $
LRSM ID NS02
Crash Reduction Factor 50%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
All-Way Stop
Control
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 92 Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=24
Intersections & Roadways
Modifes the corner of an intersection to
remove the sweeping right turn lane for
vehicles. Results in shorter crossings for
pedestrians, reduced speed for turning
vehicles, better sight lines, and space
for landscaping and other amenities.
Cost $$$
Unsafe Speed, Pedestrian Crossing
Close Slip Lane
23rd Street & Brooks Avenue
Intersections & Roadways
A directional median opening restricts
specific turning movements, such
as allowing a left-turn from a major
street but not from a minor street. A
directional median opening to restrict
left turn improves safety by reducing
the number of conflict points.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID S14
Crash Reduction Factor 50%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Directional
Median
Openings
to Restrict
Left Turns
N/A
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
A roadway must have an appropriate level
of pavement friction to ensure that drivers
are able to keep their vehicles safely
in the lane. Poor pavement conditions,
especially wet pavement, have been
identified as one of the major contributing
factors in roadway departure crashes.
When a pavement surface is wet, the level
of pavement friction is reduced, and this
may lead to skidding or hydroplaning.
Pavement friction is critical for changing
vehicle direction and ensuring the vehicle
remains in its lane. Traditional friction
courses or high friction surface treatments
should be considered for curves with
numerous wet weather crashes or severe
curves with higher operating speeds.
Cost $$
LRSM ID R21
Crash Reduction Factor 55%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
Improved
Pavement
Friction
ENGINEERING
Richmond Local Roadway Safety Plan
93 Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
When a vehicle leaves the traveled way
and encounters a pavement-shoulder
drop-off, it can be difficult for the driver to
return safely to the roadway. A safety edge
is a treatment intended to minimize drop-
off-related crashes. With this treatment, the
shoulder pavement edge is sloped at an
angle (30-35 degrees) to make it easier
for a driver to safely reenter the roadway
after inadvertently driving onto the
shoulder. This treatment is designed to be
a standard policy for any overlay project.
Cost $
Crash Reduction Factor 8-15%
Crash Type All
Safety Edge
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Guardrail redirects a vehicle away from
embankment slopes or fixed objects and
dissipates the energy of an errant vehicle.
Guardrail is installed to reduce the severity
of lane departure crashes. However,
guardrail can reduce crash severity only
for those conditions where striking the
guardrail is less severe than going down
an embankment or striking a fixed object.
Cost $$
LRSM ID R04
Crash Reduction Factor 25%
Crash Type All
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity High
Driving Under the Influence
Guardrail
S Gerrard Boulevard
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Barrier in the center of the roadway that
physically separates opposing vehicular
traffic. Median barriers can also help
control access to and from side streets
and driveways, reducing conflict points.
Cost $$$
Low Cost / Quick Build
alternative available
LRSM ID R03
Crash Reduction Factor 25%
Crash Type All
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Unsafe Speed
Median Barrier
Barrett Avenue Undercrossing
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 94 Intersections & Roadways
A roundabout is a type of circular
intersection in which road traffic is
permitted to flow in one direction around
a central island, and priority is typically
given to traffic already in the junction.
The types of conflicts that occur at
roundabouts are different from those
occurring at conventional intersections;
namely, conflicts from crossing and
left-turn movements are not present
in a roundabout. The geometry of a
roundabout forces drivers to reduce
speeds as they proceed through the
intersection; the range of vehicle speeds
is also narrowed, reducing the severity of
crashes when they do occur. Pedestrians
only have to cross one direction of traffic
at a time at roundabouts, thus reducing the
potential for vehicle/pedestrian conflicts.
Cost $$$
Low Cost / Quick Build
alternative available
LRSM ID S16/NS04
Crash Reduction Factor Varies
Crash Type All
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Low
Roundabout
Unsafe Speeds, Not Stopping, Pedestrian Crossing
Cutting Boulevard & Carlson Boulevard Intersection
Other Reference Information
Currently the CMF Clearinghouse has only
one reference for ped/vehicle collisions which
indicates an increase in crash likelihood. However,
a majority of references for all crash types
show a decrease in collisions. See additional
reference: FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Traffic signals at intersections control
the flow of traffic. Traffic signals have the
potential to reduce the most severe type
crashes but will likely cause an increase
in rear-end collisions. A reduction in
overall injury severity is likely the largest
benefit of traffic signal installation.
Cost $$$
LRSM ID NS03
Crash Reduction Factor 30%
Crash Type All
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Low
Not Stopping
Signal
TBD
Figure 21. Examples Markings for One-Lane Roundabouts
Source: CA MUTCD
Richmond Local Roadway Safety Plan
95 Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Superelevation is the rotation of the
pavement on the approach to and
through a horizontal curve and is intended
to assist the driver in negotiating the
curve by counteracting the lateral
acceleration produced by tracking. In
other words, the road is designed so
that the pavement rises as it curves,
offsetting the horizontal sideways
momentum of the approaching vehicle.
Cost $$
Crash Reduction Factor 40%
Superelevation
at Horizontal
Curve
Locations
Intersections & Roadways
Irregular intersections can be overbuilt
and confusing, presenting safety hazards
to all users. “Squaring up” an intersection
as close to 90 degrees as possible
involves intersection reconstruction to
provide better visibility for all road users,
also reducing high speed turns and
reducing pedestrian crossing length.
Cost $$$
Low Cost / Quick Build
alternative available
TBD
Intersection
Reconstruction
and Tightening
TBD
Intersections & Roadways
Lane narrowing reduces lane widths to
encourage motorists to travel at slower
speeds. Lane Narrowing improves safety
by lowering the risk of collision among
bicyclists, pedestrians, and other motorists.
Cost $
Unsafe Speed
Lane
Narrowing
Cutting Boulevard
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 96 Intersections & Roadways
Uses paint and bollards to extend the
curb and slow left turns at intersections
of one-way to one-way or two-way
streets. Widening the turning radii of
left-turning vehicles expands the feld
of vision for drivers and increases
the visibility of pedestrians.
Cost $
Low Cost / Quick Build
alternative available
Left Turn
Enhanced
Daylighting/
Slow Turn
Wedge
Intersections & Roadways
A painted median with plastic posts
between the two directions of travel.
Reduces vehicular speeding and
discourages risky turning movements,
increasing pedestrian safety.
Cost $
Low Cost / Quick Build
alternative available
Paint and
Plastic Median
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=34
Intersections & Roadways
Mini circles use paint and soft hit posts
to replace stop-controlled intersections
with a circular design that slows trafc
and eliminates left turns, also reducing
confict points with pedestrians. Also
helps traffic flow more efficiently.
Cost $
Low Cost / Quick Build
alternative available
Paint and
Plastic Mini
Circle
ENGINEERING
Richmond Local Roadway Safety Plan
97 Intersections & Roadways
A roadway treatment that restricts
through vehicle movements using
physical diversion while allowing
bicyclists and pedestrians to proceed
through an intersection in all directions.
Cost $
Low Cost / Quick Build
alternative available
Partial Closure/
Diverter
Other Reference Information
Evolution of the Protected Intersection, Alta
Planning and Design, December 2015. https://
altaplanning.com/wp-content/uploads/Evolution-
of-the-Protected-Intersection_AL TA-2015.pdf
Intersections & Roadways
Protected intersections use corner
islands, curb extensions, and colored
paint to delineate bicycle and pedestrian
movements across an intersection. Slower
driving speeds and shorter crossing
distance increase safety for pedestrians.
Separates bicycles from pedestrians
Cost $$$
Low Cost / Quick Build
alternative available
Protected
Intersection
Intersections & Roadways
A Raised Crosswalk is a pedestrian
crosswalk that is typically elevated 3-6
inches above the road or at sidewalk
level. A Raised Crosswalk improves safety
by increasing crosswalk and pedestrian
visibility and slowing down motorists.
Cost $$
LRSM ID R36PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Raised
Crosswalk
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 98 Other Reference Information
Note: some studies in CMF Clearinghouse show an
increase in crashes. See additional source below
showing decrease. (1) Perkins+Will Consultant
T eam. “Pedestrians at Multi-Modal Intersections.”
Better Market Street Existing Conditions & Best
Practices, Part Two: Best Practices 36-58, City &
County of San Francisco, San Francisco. http://
www.bettermarketstreetsf.org/about-reports-
existing-conditions.html (2) Bhatt, Shailen, Natalie
Barnhart, Mark Luszcz, T om Meyer, & Michael
Sommers. “Delaware T rafifc Calming Design Manual.”
Delaware Department of T ransportation, State of
Delaware, Dover, DE. https://nacto.org/wp-content/
uploads/2015/04/DE-T rafc-Calming-Manual_2012.
pdf (3) King, Michael R, Jon A Carnegie, and Reid
Ewing. “Pedestrian Safety through a Raised Median
and Redesigned Intersections.” Journal of the
T ransportation Research Board 1828 (1), 56-66,
T ransportation Research Board, Washington, DC.
https://trid.trb.org/view/663867 (4) Fitzpatrick,
Kay, Mark D Wooldridge, and Joseph D Blaschke.
“Urban Intersection Design Guide: Volume 1–
Guidelines.” T exas T ransportation Institute, T exas
A&M University System, T exas Department of
T ransportation, Austin, TX. https://static.tti.tamu.
edu/tti.tamu.edu/documents/0-4365-P2.pdf
Intersections & Roadways
Elevates the intersection to bring vehicles
to the sidewalk level. Serves as a traffic
calming measure by extending the
sidewalk context across the road.
Cost $$$
Raised
Intersection
Intersections & Roadways
Curbed sections in the center of
the roadway that are physically
separated from vehicular traffc.
Raised medians can also help control
access to and from side streets and
driveways, reducing confict points.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID S12/NS14/R08
Crash Reduction Factor 25%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Left-Turns, Pedestrian Right-of-Way
Raised Median
Cutting Boulevard, I-580 Approach
Intersections & Roadways
Geometric designs that alter how left-
turn movements occur can simplify
decisions and minimize the potential
for related crashes. Two highly effective
designs that rely on U-turns to complete
certain left-turn movements are known
as the restricted crossing U-turn (RCUT)
and the median U-turn (MUT).
Cost $$$
LRSM ID NS16
Crash Reduction Factor 50%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Left-Turns
Reduced Left-
Turn Conflict
Intersection
TBD
ENGINEERING
Richmond Local Roadway Safety Plan
99 Intersections & Roadways
A Raised Median, or Refuge Island,
is a raised barrier in the center of the
roadway that can restrict certain turning
movements and provide a place for
pedestrians to wait if they are unable to
finish crossing the intersection. A Raised
Median improves safety by reducing the
number of potential conflict points with
designated zones for vehicles to turn,
and a pedestrian refuge island improves
safety by reducing the exposure time for
pedestrians crossing the intersection.
Pedestrian refuge areas constructed from
paint and plastic may be implemented as
part of a low-cost/quick build project.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID NS19PB
Crash Reduction Factor 45%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Pedestrian Crossing
Refuge Island
23rd Street & Esmond Avenue
Intersections & Roadways
A right turn slip lane is a traffic lane
provided at an intersection to allow
vehicles to turn right without actually
entering it and interfering with through
traffic. Where the main intersection is
controlled by traffic signals, a slip lane is
often controlled by yield or stop sign.
Cost $$$
Right Turn
Slip Lane
Figure 22. Refuge Island
Source: Seattle Streets Illustrated, https://streetsillustrated.seattle.gov/design- standards/intersections/pedcrossing/. Fehr & Peers Traffic Calming Toolbox.
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 100
Intersections & Roadways
A Road Diet reduces roadway space
dedicated to vehicle travel lanes
to create room for bicycle facilities,
wider sidewalks, or center turn lanes.
A Road Diet improves safety by
reducing vehicle speeds and creating
designated space for all road users.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID R14
Crash Reduction Factor 30%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Unsafe Speed, Pedestrian Right-of-Way
Road Diet
23rd Street
Intersections & Roadways
A raised area that separates the two
directions of travel on the minor street
approach at an unsignalized intersection
or roundabout. Helps channelize traffic
in opposing directions of travel. Typically
installed at skewed intersections or
where speeds on minor roads are high.
Provides a refuge for pedestrians.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID NS13
Crash Reduction Factor 40%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Splitter Island
N/A
ES2
EXECUTIVE SUMMARY
local economies, such as property values or business
revenues. In other words, while there are myriad
voices linking road diets to both positive and negative economic outcomes, there is very little concrete
evidence to support either claim. York Boulevard: The
Economics of a Road Diet explores this relationship
through case research in the Highland Park
neighborhood of northeast Los Angeles, California.
The backbone of a low- to moderate-density,
mixed residential and commercial neighborhood,
York Boulevard is an ideal corridor for studying the
economic effects of road diets because it creates
a natural experiment. Land uses, socioeconomic
characteristics, and the quantity and types of
businesses remain fairly comparable over the entire
the study corridor, but half of the corridor has a road diet and bicycle lanes and the other half does not.
As Figure ES2 illustrates, the western portion of the
corridor—between Eagle Rock Boulevard and Avenue
55—received a road diet in 2006 and bike lanes in
2010. The eastern half of the York Boulevard corridor,
from Avenue 55 to Figueroa Street, retains its original, Pre-Road Diet
Two auto lanes in each direction, shared with bicycles
Post-Road Diet
One auto lane and one bike lane in each direction, plus a center turn lane FigureTypical road diet conversion ES1
Figure 23. Figure 19 Typical Road Diet Configuration
Source: Fehr & Peers
Richmond Local Roadway Safety Plan
101
Intersections & Roadways
Straightening crosswalks improves
sight lines, making pedestrians more
visible to oncoming drivers, and
may shorten the crossing distance,
reducing the length of time required for
pedestrians to cross an intersection.
Cost $
Low Cost / Quick Build
alternative available
Straighten
Crosswalk
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Intersections & Roadways
Widened and paved shoulders, which
may also include flattening the slopes
along the sides of the roadway, create a
separated space for bicyclists and also
provide motor vehicle safety benefits,
such as space for inoperable vehicles to
pull out of the travel lane. The addition
of a paved shoulder to an existing road
can help to reduce run-off-road crashes.
Benefits can be realized for high risk rural
roads without paved shoulders, regardless
of existing lane pavement width. Adding
paved shoulders within horizontal
curve sections may help agencies
maximize benefits of the treatment while
minimizing costs as opposed to adding
paved shoulders to an entire corridor.
Cost $$
LRSM ID R15
Crash Reduction Factor 30%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Widen/Pave
Shoulder
Intersections & Roadways
These traffic calming devices use vertical
defection to raise the entire wheelbase
of a vehicle and encourage motorists to
travel at slower speeds to avoid damage
to the undercarriage of an automobile.
Cost $
Unsafe Speed
Speed Hump
or Speed Table
22nd Street & Roosevelt Avenue
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 102
Other Reference Information
The CMF Clearinghouse has limited research
related to vehicle/pedestrian crashes. See
additional reference: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=20
Other
Vehicles entering and exiting driveways
may confict with pedestrians and with
vehicles on the main road, especially at
driveways within 250 feet of intersections.
Closing driveways near intersections
with high collision rates related to
driveways may reduce potential conficts.
Cost $$
Access
Management/
Close Driveway
Other Reference Information
Pedestrian-Level Lighting: FHWA Pedestrian
Safety Guide and Countermeasure Selection
System. http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=8
Other
Lighting is added at an intersection.
Adding intersection and/or pedestrian-
scale lighting at intersections improves
safety by increasing visibility of all road
users. This countermeasure is most
effective at reducing or preventing
collisions at intersections at night.
Cost $$
LRSM ID NS01
Crash Reduction Factor 40%
Crash Type Night
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Intersection
Lighting
Driving Under the Inf uence
Cutting Boulevard
Other
Providing roadway lighting improves
safety during nighttime conditions by
increasing driver awareness, increasing
sight distance, and improving visibility
of pedestrians and bicyclists.
Cost $$
LRSM ID R01
Crash Reduction Factor 35%
Crash Type Night
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Segment
Lighting
Driving Under the Influence
Cutting Boulevard
ENGINEERING
Richmond Local Roadway Safety Plan
103
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
A clear zone is an unobstructed,
traversable roadside area that allows
a driver to stop safely or regain control
of a vehicle that has left the roadway.
The width of the clear zone should be
based on risk (also called exposure).
Key factors in assessing risk include
traffic volumes, speeds, and slopes.
Clear roadsides reduce risk from fixed
objects (such as utility poles) as well as
terrain that may increase the likelihood
of a rollover. Creating or increasing clear
zones within horizontal curve sections
may help agencies maximize benefits
of the treatment while minimizing
costs, as opposed to providing a clear
zone throughout an entire corridor.
Cost $$
Crash Reduction Factor 13-44%
Crash Type All, KSI
Create or
Increase
Clear Zone
Other
Curbside management can better
prioritize reliable transit and safe
bicycling infrastructure, freight deliveries,
passenger pick-ups/drop-ofs,green
stormwater infrastructure, public
spaces, and parking management.
Cost $
Curbside
Management
Other
Far-side bus stops are located immediately
after an intersection, allowing the bus
to pass through the intersection before
stopping for passenger loading and
unloading. Far-side stops encourage
pedestrians to cross behind the
bus for greater visibility and can
improve transit service reliability.
Cost $
Far-Side
Bus Stop
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 104
Other
Delineators, reflectors and/or object
markers are intended to warn drivers
of an approaching curve or fixed object
that cannot easily be removed. They are
generally less costly than Chevron Signs
as they don’t require posts to place along
the roadside, avoiding an additional object
with which an errant vehicle can crash into.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R27
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Delineators,
Reflectors,
and/or Object
Markers
N/A
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
Impact attenuators bring an errant vehicle
to a more-controlled stop or redirect
the vehicle away from a rigid object.
Impact attenuators are typically used
to shield rigid roadside objects such as
concrete barrier ends, steel guardrail
ends and bridge pillars from oncoming
automobiles. Attenuators should only
be installed where it is impractical
for the objects to be removed.
Cost $$
LRSM ID R05
Crash Reduction Factor 25%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
Impact
Attenuators
Other
The installation of median guardrail is most
suitable for use in traversable medians
having no or little change in grade and
cross slope. While these systems may
not reduce the frequency of crashes
due to roadway departure, they can
help prevent a lane-departure crash
from becoming a head-on collision.
Cost $$
TBD
Median
Guardrail
TBD
ENGINEERING
Richmond Local Roadway Safety Plan
105
Other Reference Information
TRB Study on Setting Speed Limits
Other
Setting speed limits to reflect the
surrounding context of the roadway and
that meet with driver expectations can
help improve driver respect for speed
limits. Speed limits that appear inconsistent
may be ignored by the majority of drivers
and this may contribute to lack of respect
for speed limit and other traffic laws.
Cost $
Speed Limit
Reduction
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
Relocating or removing utility poles
from within the clear zone alleviates the
potential for fixed-object crashes. If utility
poles cannot be completely eliminated
from within the clear zone, efforts can be
made to either relocate the poles to a
greater offset from the road or delineated.
Cost $$
Relocate Select
Hazardous
Utility Poles
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
Remove objects that may prevent drivers
and pedestrians from having a clear
sightline. May include installing red curb
at intersection approaches to remove
parked vehicles (also called “daylighting”),
trimming or removing landscaping, or
removing or relocating large signs.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS11
Crash Reduction Factor 20%
Crash Type All
Expected Life 10
Federal Funding Eligibility 90%
Systemic Opportunity High
N/A
Remove
Obstructions
For Sightlines
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 106
Other
Upgrading Lighting to LED replaces
high-pressure sodium light bulbs with
LED light bulbs in street lights. Upgrading
Lighting to LED improves safety by
increasing the visibility of pedestrians in
crosswalks through greater color contrast
and larger areas of light distribution.
Cost $$
Upgrade
Lighting to LED
Other
A red light camera enforces traffic signal
compliance by capturing the image of a
vehicle that has entered an intersection
in spite of the traffic signal indicating red.
The automatic photographic evidence
is used by authorities to enforce traffic
laws and issue traffic violation tickets.
Cost $$
Red Light
Camera
Other
Back-In Angled Parking requires motorists
to back into an angled on-street parking
spot and to drive forward when exiting
a parking spot. Back-in angled parking
improves safety by increasing visibility
of passing vehicles and bicycles while
exiting a spot, particularly if large
adjacent vehicles obstruct sight, and
allows trunk unloading to happen on
the curb instead of in the street.
Cost $
Low Cost / Quick Build
alternative available
Back-In Angled
Parking
ENGINEERING
Richmond Local Roadway Safety Plan
107
Other Reference Information
Data in the CMF Clearinghouse is currently limited to
bicycle/vehicle collisions. See additional reference:
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=1
Pedestrian Facilities
Adding sidewalks provides a separated
and continuous facility for people to walk
along the roadway. Adding sidewalks
improves safety by minimizing collisions
with pedestrians walking in the road.
Cost $$
LRSM ID R34PB
Crash Reduction Factor 80%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Pedestrian Right-of-Way
Add Sidewalk
Barrett Avenue Undercrossing
Pedestrian Facilities
A pedestrian crossing at an intersection
or on a segment provides a formalized
location for people to cross the street,
reducing the risk of people crossing
outside crosswalks where drivers
are not expecting them. Crosswalk
striping, signs, and other enhanced
safety features alert drivers that there
may be a pedestrian crossing.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R35PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
Install/Upgrade
Pedestrian
Crossing at
Uncontrolled
Locations
(Signs and
Markings Only)
Pedestrian Crossing, Pedestrian Right-of-Way
Cutting Boulevard & S 12th Street
Pedestrian Facilities
Place bus stops and pedestrian
crossings in close proximity to allow
transit riders to cross the street safely.
Cost $
Low Cost / Quick Build
alternative available
Pedestrian Crossing
Co-Locate
Bus Stops and
Pedestrian
Crossings
Cutting Boulevard & S 26th Street
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 108
Other Reference Information
(1) Application of Pedestrian Crossing T reatments for
Streets and Highways, NCHRP, 2016. https://www.
nap.edu/catalog/24634/application-of-pedestrian-
crossing-treatments-for-streets-and-highways
(2) Development of Crash Modifcation Factors
for Uncontrolled Pedestrian Crossing T reatments,
NCHRP, 2017. https://www.nap.edu/catalog/24627/
development-of-crash-modifcation-factors-for-
uncontrolled-pedestrian-crossing-treatments
(3) Evaluation of Pedestrian-Related Roadway
Measures, Pedestrian and Bicycle Information
Center, 2014. http://www.pedbikeinfo.org/cms/
downloads/PedestrianLitReview_April2014.pdf
Pedestrian Facilities
A curb extension is a traffic calming
measure which widens the sidewalk
for a short distance to enhance the
pedestrian crossing. This reduces the
crossing distance and allowing pedestrians
and drivers to see each other when
parked vehicles would otherwise block
visibility. Paint and plastic curb extensions
are a low-cot/quick build option.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID NS21PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Pedestrian Crossing
Curb
Extensions
Macdonald Avenue & 22nd Street
Other Reference Information
Audible Push Button Upgrade and Extended
Time Pushbutton: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=52
Pedestrian Facilities
A pushbutton that can be pressed to
request extra time for using the crosswalk,
beyond the standard crossing time.
Ideal near senior-serving land uses.
Cost $
Extended Time
Pushbutton
Figure 24. Curb Extension
Source: : Seattle Streets Illustrated, https://streetsillustrated.seattle. gov/design-standards/intersections/pedcrossing/#CurbBulbs
Richmond Local Roadway Safety Plan
109
Pedestrian Facilities
A high-visibility crosswalk has a striped
pattern with ladder markings made
of high-visibility material, such as
thermoplastic tape, instead of paint. A
high-visibility crosswalk improves safety
by increasing the visibility of marked
crosswalks and provides motorists a cue
to slow down and yield to pedestrians.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S18/NS20
Crash Reduction Factor 25%
Crash Type Ped and Bike
Expected Life 10-20
Federal Funding Eligibility 100%
Systemic Opportunity High
Pedestrian Crossing, Pedestrian Right-of-Way
High-Visibility
Crosswalk
Cutting Boulevard & Marina Way S
Pedestrian Facilities
Displays “countdown” of seconds
remaining on the pedestrian signal.
Countdown indications improve safety
for all road users, and are required for
all newly installed traffic signals where
pedestrian signals are installed.
Cost $$
LRSM ID S17PB
Crash Reduction Factor 25%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Pedestrian Right-of-Way
Pedestrian
Countdown
Timer
Macdonald Avenue & 22nd Street
Pedestrian Facilities
A pedestrian-hybrid beacon (PHB) is used
at unsignalized intersections or mid-block
crosswalks to notify oncoming motorists
to stop with a series of red and yellow
lights. Unlike a traffic signal, the PHB rests
in dark until a pedestrian activates it via
pushbutton or other form of detection.
Cost $$$
LRSM ID NS23PB
Crash Reduction Factor 55%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Low
Pedestrian Right-of-Way
Pedestrian
Hybrid Beacon
Cutting Boulevard & 24th Street
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 110
Pedestrian Facilities
Separating drivers from bicyclists and
pedestrians using landscaping provides
more space between the modes and
can produce a traffc calming effect by
encouraging drivers to drive at slower
speeds, lowering the risk of crashing.
Cost $$
Landscape
Buffer
Other Reference Information
Pedestrian Phase Recall: Evaluation of Pedestrian-
Related Roadway Measures, Pedestrian and
Bicycle Information Center, 2014. http://
www.pedbikeinfo.org/cms/downloads/
PedestrianLitReview_April2014.pdf
Pedestrian Facilities
At intersection locations that have a high
volume of turning vehicle and have high
pedestrian vs. vehicle crashes, a leading
pedestrian interval gives pedestrians
the opportunity to enter an intersection
3 - 7 seconds before vehicles are
given a green indication. With this head
start, pedestrians can better establish
their presence in the crosswalk before
vehicles have priority to turn left or right.
Cost $
LRSM ID S21PB
Crash Reduction Factor 60%
Crash Type Ped and Bike
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Leading
Pedestrian
Interval and
Pedestrian
Recall
Pedestrian Crossing, Left-Turns
Macdonald Avenue & 23rd Street
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=11
Pedestrian Facilities
An intersection treatment that relies on
sensors to detect when a pedestrian is
waiting at a crosswalk and automatically
triggers the pedestrian “WALK” phase.
Reduces crossings at inappropriate
times and ensures that pedestrians have
enough time to safely cross the roadway.
Cost $$
Pedestrian
Detection
ENGINEERING
Richmond Local Roadway Safety Plan
111
Pedestrian Facilities
Removes existing crossing prohibitions
and provides marked crosswalk
and other safety enhancements for
pedestrians to cross the street.
Cost $
Low Cost / Quick Build
alternative available
Remove
Crossing
Prohibition
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=4
Pedestrian Facilities
Periodic restriping of crosswalks
is necessary to ensure the traffic
markings are visible. Crosswalk may be
restriped with high visibility markings.
Cost $
Low Cost / Quick Build
alternative available
TBD
Restripe
Crosswalk
TBD
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=3
Pedestrian Facilities
T actile warning devices must be
detectable to visually impaired
pedestrians. Curb ramps must follow
the DIB 82-06 design guidelines.
Cost $$
Upgrade
Curb Ramp
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 112
Other Reference Information
Audible Push Button Upgrade and Extended
Time Pushbutton: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=52
Pedestrian Facilities
Push buttons must comply with the
Americans with Disability Act (ADA)
standards for accessibility. Pushbuttons
should be visible and conveniently
located for pedestrians waiting at
a crosswalk. Accessible pedestrian
signals, including audible push buttons,
improve access for pedestrians who
are blind or have low vision. DIB 82-06
includes accessibility design guidance.
Cost $
Audible
Push Button
Upgrade
Pedestrian Facilities
Widening sidewalks provides a more
comfortable space for pedestrians,
particularly in locations with high
volumes of pedestrians, and provides
space to accommodate people in
wheelchairs. Widening sidewalks
improves safety by minimizing collisions
with pedestrians walking in the road.
Cost $$
Widen
Sidewalk
Pedestrian Right-of-Way
Barrett Avenue Undercrossing
Pedestrian Facilities
A rectangular rapid flashing beacon (RRFB)
is a pedestrian-activated flashing light with
additional signage to alert motorists of a
pedestrian crossing. An RRFB improves
safety by increasing the visibility of marked
crosswalks and provides motorists a cue
to slow down and yield to pedestrians.
Cost $$
LRSM ID NS22PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Pedestrian Right-of-Way
Rectangular
Rapid Flashing
Beacon
Barrett Avenue & 18th Street
ENGINEERING
Richmond Local Roadway Safety Plan
113
Signals
Retroreflective borders enhance the
visibility of traffic signals for aging and
color vision impaired drivers enabling
them to understand which signal indication
is illuminated. Retroreflective borders
may also alert drivers to signalized
intersections during periods of power
outages when the signals would otherwise
be dark, and non–reflective signal heads
and backplates would not be visible.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Retroreflective
Tape on Signals
N/A
Signals
Additional signal heads allow drivers
to anticipate signal changes farther
away from intersections. Supplemental
traffic signals may be placed on
the near side of an intersection,
far-left, far-right, or very high.
Cost $$
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Supplemental
Signal Heads
N/A
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signals
The Advanced Dilemma-Zone Detection
system adjusts the start time of the yellow-
signal phase (i.e. earlier or later) based on
observed vehicle locations and speeds.
The Advanced Dilemma-Zone Detection
system improves safety by minimizing
the number of drivers that are faced with
the dilemma of determining if they should
stop at the intersection or drive through
the intersection based on their speed
and distance from the intersection.
Cost $$
LRSM ID S04
Crash Reduction Factor 40%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
Advanced
Dilemma Zone
Detection
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 114
Signals
Increases time for pedestrian walk
phases, especially to accommodate
vulnerable populations, such as
children and the elderly.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
Pedestrian Crossing
Extend
Pedestrian
Crossing Time
Cutting Boulevard
Signals
Extending yellow and all red time
increases the time allotted for the
yellow and red lights during a signal
phase. Extending yellow and all red
time improves safety by allowing
drivers and bicyclists to safely cross
through a signalized intersection
before conflicting traffic movements are
permitted to enter the intersection.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
Extend Y ellow
and All Red
Time
Driving Under the In uence
Cutting Boulevard
Signals
Flashing yellow turn arrow alerts drivers
to proceed with caution and decide if
there is a sufcient gap in oncoming trafc
to safely make a turn. T o be used only
when a pedestrian walk phase is not
called. Protected-only phases should be
used when pedestrians are present.
Cost $$
Flashing Y ellow
Turn Phase
ENGINEERING
Richmond Local Roadway Safety Plan
115
Signals
A form of pedestrian “WALK” phase
at a signalized intersection in which
all vehicular traffic is required to
stop, allowing pedestrians to safely
cross through the intersection in any
direction, including diagonally.
Cost $
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Pedestrian
Scramble
N/A
Signals
Prohibitions of left turns at locations
where a turning vehicle may confict
with pedestrians in the crosswalk
or where opposing traffc volume is
high. Reduces pedestrian interaction
with vehicles when crossing.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S15/NS16
Crash Reduction Factor 50%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Prohibit
Left Turn
N/A
Signals
Restricts left or right turns during
the pedestrian crossing phase at
locations where a turning vehicle
may confict with pedestrians in the
crosswalk. This restriction may be
displayed with a blank-out sign.
Cost $
Prohibit
Turns During
Pedestrian
Phase
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 116
Signals
A protected left turn can be implemented
at signalized intersections (with existing
left turns pockets) that currently have
a permissive left-turn or no left-turn
protection that have a high frequency
of angle crashes involving left turning,
opposing through vehicles, and non-
motorized road users. Left turns are
widely recognized as the highest-risk
movements at signalized intersections.
Providing protected left-turn phases
for signalized intersections significantly
improve the safety for left-turn
maneuvers by removing the need for
the drivers to navigate through gaps in
oncoming/opposing through vehicles.
Cost $$
LRSM ID S06/S07
Crash Reduction Factor 30-55%
Crash Type All
Left-Turns
Protected
Left Turns
Rheem Avenue & 23rd Street
Other Reference Information
Currently the CMF Clearinghouse does not include
specifc studies; however, permitting right-turns-
on-red shows an increase in ped/vehicle crashes.
Additional information is available at the FHWA
Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=49
Signals
Prohibiting right-run-on-red movements
should be considered at skewed
intersections, or where exclusive
pedestrian “WALK” phases, Leading
Pedestrian Intervals (LPIs), sight
distance issues, or high pedestrian
volumes are present. Can help prevent
crashes between vehicles turning
right on red from one street and
through vehicles on the cross street,
and crashes involving pedestrians.
Cost $
Low Cost / Quick Build
alternative available
Prohibit Right-
Turn-on-Red
Other Reference Information
(1) Evaluation of Pedestrian-Related Roadway
Measures, Pedestrian and Bicycle Information
Center, 2014. http://www.pedbikeinfo.org/cms/
downloads/PedestrianLitReview_April2014.
pdf (2) FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signals
Provides a green arrow phase for
right-turning vehicles. Avoids conficts
between right-turning traffic and
bicyclists or pedestrians crossing
the intersection on their right.
Cost $$$
Separate Right-
Turn Phasing
ENGINEERING
Richmond Local Roadway Safety Plan
117
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=45
Signals
Traffic signal cycle lengths have a
significant impact on the quality of the
urban realm and consequently, the
opportunities for bicyclists, pedestrians,
and transit vehicles to operate safely
along a corridor. Long signal cycles,
compounded over multiple intersections,
can make crossing a street or walking
even a short distance prohibitive and
frustrating. Short cycle lengths of 60–90
seconds are ideal for urban areas.
Cost $
Low Cost / Quick Build
alternative available
Shorten Cycle
Length
Signals
Certain timing, phasing, and control
strategies can produce multiple
safety benefits. Sometimes capacity
improvements come along with the
safety improvements and other times
adverse effects on delay or capacity
occur. The emphasis of improving signal
coordination for this countermeasure is
to provide an opportunity for slow speed
signal coordination. Coordinating signals
to allow for bicyclist progression, also
known as a ‘green wave,’ gives bicyclists
and pedestrians more time to safely cross
through the ‘green wave’ intersections.
Cost $$
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Signal
Interconnectivity
and
Coordination /
Green Wave
N/A
Signals
At certain hours (eg. late night) a signal
remains red for all approaches or certain
approaches until a vehicle arrives at the
intersection. If the vehicle is going faster
than the desired speed, the signal will not
turn green until after vehicle stops. If the
vehicle is going the desired speed the
signal will change to green before the
vehicle arrives. This signal timing provides
operational beneft to drivers traveling at
the desired speed limit. Can be paired
with variable speed warning signs.
Cost $$
LRSM ID R26
Crash Reduction Factor 30%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
Speed
Sensitive Rest
in Red Signal
N/A
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 118
Signals
Upgrading Signal Heads replaces
existing 8-inch signal heads with 12-
inch signal heads to comply with the
California MUTCD’s 2014 guidelines.
Upgrading signal heads improves safety
by providing better visibility of intersection
signals and by aiding drivers’ advanced
perception of upcoming intersections.
Cost $
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
N/A
Upgrade
Signal Head
N/A
Signing & Striping
An advanced stop bar is a horizontal
stripe painted ahead of the crosswalk
at stop signs and signals to indicate
where drivers should stop. An advanced
stop bar improves safety by reducing
instances of vehicles encroaching on
the crosswalk. Creating a wider stop
bar or setting the stop bar further back
may be appropriate for locations with
known crosswalk encroachment issues.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S20PB
Crash Reduction Factor 15%
Crash Type Ped and Bike
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Pedestrian Right-of-Way, Not Stopping
Advance
Stop Bar
Barrett Avenue & Marina Way
Signing & Striping
Yield lines are placed 20 to 50 feet
in advance of multi-lane pedestrian
crossings to increase visibility of
pedestrians. They can reduce the
likelihood of a multiple-threat crash.
Cost $
Low Cost / Quick Build
alternative available
TBD
Advance Yield
Markings
TBD
ENGINEERING
Richmond Local Roadway Safety Plan
119
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signing & Striping
A curve advance warning sign notifies
drivers of an approaching curve and
may include an advisory speed limit as
drivers navigate around the curve. This
warning sign is ideally combined with
other infrastructure that alerts drivers
of the curve, such as chevron signs,
delineators, and flashing beacons. A
curve advance warning sign improves
safety by giving drivers additional
time to slow down for the curve.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R24
Crash Reduction Factor 25%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Curve Advance
Warning Sign
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signing & Striping
A flashing beacon as Advanced
Warning is a blinking light with signage
to notify motorists of an upcoming
intersection or crosswalk. A flashing
beacon improves safety by providing
motorists more time to be aware of and
slow down for an intersection or yield
to pedestrians crossing a crosswalk.
Cost $$
LRSM ID S10
Crash Reduction Factor 30%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Medium
Pedestrian Crossing
Flashing
Beacon as
Advance
Warning
TBD
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signing & Striping
Post-mounted chevrons are intended to
warn drivers of an approaching curve and
provide tracking information and guidance
to the drivers. They can be beneficial
on roadways that have an unacceptable
level of crashes on relatively sharp curves
during periods of light and darkness.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R23
Crash Reduction Factor 40%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Chevron Signs
on Horizontal
Curves
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 120
Signing & Striping
An LED-Enhanced Sign has LED lights
embedded in the sign to outline the
sign itself or the words and symbols
on the sign. The LEDs may be set to
flash or operate in a steady mode. An
LED-enhanced sign improves safety
by improving the visibility of signs at
locations with visibility limitations or with
a documented history of drivers failing to
see or obey the sign (e.g. at STOP signs).
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS08
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
LED-Enhanced
Sign
N/A
Signing & Striping
A raised pavement marker is a small
device attached to the road and used
as a positioning guide for drivers.
Cost $
Low Cost / Quick Build
alternative available
Painted
Centerline
and Raised
Pavement
Markers at
Curves on
Residential
Streets
Signing & Striping
A speed feedback sign notifies drivers
of their current speed, usually followed
by a reminder of the posted speed limit.
A speed feedback sign improves safety
by providing a cue for drivers to check
their speed and slow down, if necessary.
Cost $
Low Cost / Quick Build
alternative available
TBD
Speed
Feedback Sign
TBD
ENGINEERING
Richmond Local Roadway Safety Plan
121
Signing & Striping
Speed legends are numerals painted on
the roadway indicating the current speed
limit in miles per hour. They are usually
placed near speed limit signposts.
Cost $
Low Cost / Quick Build
alternative available
Speed Legends
on Pavement at
Neighborhood
Entries
Signing & Striping
Adding clear pavement markings
can guide motorists through complex
intersections. Intersections where
the lane designations are not clearly
visible to approaching motorists and/
or intersections noted as being complex
and experiencing crashes that could
be attributed to a driver’s unsuccessful
attempt to navigate the intersection
can benefit from this treatment.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S09
Crash Reduction Factor 10%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Striping
Through
Intersection
N/A
Signing & Striping
Restricts left-turns or right-turns during
certain time periods when there may
be increased potential for confict
(e.g., peak periods, school hours).
Cost $
Low Cost / Quick Build
alternative available
Time-Based
Turn Restriction
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 122
Signing & Striping
Upgrading intersection pavement marking
can include “Stop Ahead” markings and
the addition of centerlines and stop
bars. Upgrading intersection pavement
markings can improve safety by increasing
the visibility of intersections for drivers
approaching and at the intersection.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS07
Crash Reduction Factor 25%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
TBD
Upgrade
Intersection
Pavement
Markings
TBD
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signing & Striping
Upgrading signs with fluorescent
sheeting replaces existing signs with new
signs that can clearly display warnings
by reflecting headlamp light back to
vehicles. Upgrading signs with fluorescent
sheeting improves safety by increasing
visibility of signs to drivers at night.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R22
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Upgrade
Signs with
Fluorescent
Sheeting
N/A
Signing & Striping
Restripe lanes with refective striping
to improve striping visibility and clarify
lane assignment, especially where
the number of lanes changes.
Cost $
Low Cost / Quick Build
alternative available
TBD
Upgrade
Striping
TBD
ENGINEERING
Richmond Local Roadway Safety Plan
123
Signing & Striping
Upgrading to larger warning signs replaces
existing signs with physically larger signs
with larger warning informaiton. Upgrading
to larger warning signs improves safety
by increasing visibility of the information
provided, particularly for older drivers.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS06
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
TBD
Upgrade
to Larger
Warning Signs
TBD
Signing & Striping
A network of signs that highlight
nearby pedestrian and bicycle facilities.
Can help to reduce crossings at
locations with poor sight distance or
limited crossing enhancements.
Cost $
Wayfinding
Signing & Striping
“Yield Here to Pedestrians” signs alert
drivers about the presence of pedestrians.
These signs are required with advance
yield lines. Other sign types can be
placed on the centerline in the roadway.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS06
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
Pedestrian Right-of-Way
Yield T o
Pedestrians
Sign
TBD
ENGINEERING
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 124
Non-Engineering: Better Data
Improve the accuracy, breadth, and
consistency of crash data by creating
a near-miss and unreported crash
database, developing a standardized
electronic reporting form for all crashes,
forming agreements with shared mobility
operators to acquire crash data, and/or
creating a multi-jurisdiction crash database
that can be updated by paramedics,
police, City staff, and hospitals.
Improve Crash
Data Collection
Non-Engineering: Education
Partner with local bike shops and other
partners to host events/fairs to educate
residents on bicycle safety. For example,
host rides to introduce residents
to new bicycle facilities as they are
opened; offer tune ups at safety fairs.
Bicycle Safety
Education
Events
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
ENGINEERING
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
Non-Engineering: Better Data
Improve the accuracy, breadth, and
consistency of crash data by creating
a near-miss and unreported crash
database, developing a standardized
electronic reporting form for all crashes,
forming agreements with shared mobility
operators to acquire crash data, and/or
creating a multi-jurisdiction crash database
that can be updated by paramedics,
police, City staff, and hospitals.
Improve Crash
Data Collection
Richmond Local Roadway Safety Plan
125
Non-Engineering: Education
Launch targeted public education
campaigns for seniors, non-
English speaking populations,
or other vulnerable groups.
Education
Campaigns
for Vulnerable
Groups
Non-Engineering: Education
Implement pilot demonstration safety
projects. Projects can either be
implemented on a temporary basis
(tactical urbanism) or permanent basis
with room for modification (quick builds).
Pilot
Demonstration
Safety Projects
Launch public safety education campaigns.
Example campaign topics include
safe speeds, yielding to pedestrians,
distracted driving, drinking and driving,
awareness of bicyclists and pedestrians,
appropriate crosswalk behavior, rail
safety, moving over for EMS vehicles, etc.
Campaigns may include yard signs, wall
boards/posters in prime injury-corridor
neighborhoods, ads on bus exteriors,
radio ads, etc. Public education may also
involve making safety and crash data
publically available on project websites,
the local agency’s data portal, social
media, and other avenues as appropriate.
Non-Engineering: Education
TBD
Public
Information
Campaigns
TBD
ENGINEERING
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
Launch a countywide transportation
safety education campaign targeting
youth that covers a wide range of topics,
such as alcohol and drug impairment,
speeding, and potentially distracted
driving. Local schools can also be partners
in promoting safe driver behavior during
school pick-up and drop offs. Educational
campaigns that involve both students
and parents can be more impactful as
they involve parents, who are actually
driving, and students, who may not only
remind their parents but also retain safe
driving behavior if they eventually drive.
Non-Engineering: Education
TBD
Y outh
Education
TBD
Appendix B: Countermeasure Toolbox, Countermeasures Included in Priority Projects 126
Non-Engineering: Maintenance
A smoothly paved surface free of debris
enhances safety for vehicles and bicyclists.
Cost
Keep
Roadways
Clear of Debris
Non-Engineering: Partnerships
Establish a Safe Routes to School
(SRTS) program in partnership
with school districts.
Cost
TBD
Safe Routes
to School
TBD
Non-Engineering: Policies
and Programs
Update policies, standards, and guidelines
on topics such as signal timing, street
design, street lighting, complete
streets, and pedestrian crossings to
incorporate current best practices
and improve safety for all modes.
Cost
Update City
Policies and
Standards
ENGINEERING
Richmond Local Roadway Safety Plan
127
Non-Engineering: Policies
and Programs
Develop a neighborhood slow zone
program to allow neighborhoods to
request treatments to slow motor
vehicles to 15 to 20 mph using traffic
calming features, signs, and markings.
Selected locations are typically in
areas serving children, seniors, public
transit users, commercial activity,
and pedestrian/bicycle activity.
Cost
Neighborhood
Slow Zones
Non-Engineering: Policies
and Programs
When developing a program of targeted
enforcement and deterrence, use collision
history and corridors on the High Injury
Network as one criterion for where to
concentrate enforcement efforts. Add extra
patrols to look for distracted drivers as part
of a statewide distracted driving campaign,
with focus on where data indicates that
the most traffic safety benefit can be
realized. Implement deterrence policies
that are highly visible, such as publicized
sobriety checkpoints, saturation patrol, and
other forms of high visibility enforcement
that are effective for safety outcomes.
Cost
Targeted
Enforcement
and Deterrence
ENGINEERING
Appendix B: Countermeasure Toolbox, Additional LRSM Countermeasures 128
Bikeways
Prolongs the green phase when bicyclists
are present to provide additional time
for bicyclists to clear the intersection.
Can occur automatically in the signal
phasing or when prompted with
bicycle detection. T opography should
be considered in clearance time.
Cost $
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Extend Green
Time For Bikes
N/A
Intersections & Roadways
An all-way stop-controlled intersection
requires all vehicles to stop before
crossing the intersection. An all-way stop
controlled intersection improves safety
by removing the need for motorists,
bicyclists, and pedestrians on a side-street
stop-controlled intersection to cross free-
flowing lanes of traffic, which reduces the
risk of collision. An “ ALL WAY” sign should
be placed under the octagonal stop sign
at all-way stop-controlled intersections
as required by the California Manual on
Uniform Traffic Control Devices (MUTCD).
Cost $
LRSM ID NS02
Crash Reduction Factor 50%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
All-Way Stop
Control
N/A
Intersections & Roadways
A directional median opening restricts
specific turning movements, such
as allowing a left-turn from a major
street but not from a minor street. A
directional median opening to restrict
left turn improves safety by reducing
the number of conflict points.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID S14
Crash Reduction Factor 50%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Directional
Median
Openings
to Restrict
Left Turns
N/A
Richmond Local Roadway Safety Plan
129
Intersections & Roadways
A Raised Crosswalk is a pedestrian
crosswalk that is typically elevated 3-6
inches above the road or at sidewalk
level. A Raised Crosswalk improves safety
by increasing crosswalk and pedestrian
visibility and slowing down motorists.
Cost $$
LRSM ID R36PB
Crash Reduction Factor 35%
Crash Type Ped and Bike
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Raised
Crosswalk
N/A
Intersections & Roadways
A raised area that separates the two
directions of travel on the minor street
approach at an unsignalized intersection
or roundabout. Helps channelize traffic
in opposing directions of travel. Typically
installed at skewed intersections or
where speeds on minor roads are high.
Provides a refuge for pedestrians.
Cost $$
Low Cost / Quick Build
alternative available
LRSM ID NS13
Crash Reduction Factor 40%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Splitter Island
N/A
Other
Delineators, reflectors and/or object
markers are intended to warn drivers
of an approaching curve or fixed object
that cannot easily be removed. They are
generally less costly than Chevron Signs
as they don’t require posts to place along
the roadside, avoiding an additional object
with which an errant vehicle can crash into.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R27
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Delineators,
Reflectors,
and/or Object
Markers
N/A
Appendix B: Countermeasure Toolbox, Additional LRSM Countermeasures 130
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
Remove objects that may prevent drivers
and pedestrians from having a clear
sightline. May include installing red curb
at intersection approaches to remove
parked vehicles (also called “daylighting”),
trimming or removing landscaping, or
removing or relocating large signs.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS11
Crash Reduction Factor 20%
Crash Type All
Expected Life 10
Federal Funding Eligibility 90%
Systemic Opportunity High
N/A
Remove
Obstructions
For Sightlines
N/A
Signals
Retroreflective borders enhance the
visibility of traffic signals for aging and
color vision impaired drivers enabling
them to understand which signal indication
is illuminated. Retroreflective borders
may also alert drivers to signalized
intersections during periods of power
outages when the signals would otherwise
be dark, and non–reflective signal heads
and backplates would not be visible.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Retroreflective
Tape on Signals
N/A
Signals
Additional signal heads allow drivers
to anticipate signal changes farther
away from intersections. Supplemental
traffic signals may be placed on
the near side of an intersection,
far-left, far-right, or very high.
Cost $$
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Supplemental
Signal Heads
N/A
Richmond Local Roadway Safety Plan
131
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signals
The Advanced Dilemma-Zone Detection
system adjusts the start time of the yellow-
signal phase (i.e. earlier or later) based on
observed vehicle locations and speeds.
The Advanced Dilemma-Zone Detection
system improves safety by minimizing
the number of drivers that are faced with
the dilemma of determining if they should
stop at the intersection or drive through
the intersection based on their speed
and distance from the intersection.
Cost $$
LRSM ID S04
Crash Reduction Factor 40%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
Advanced
Dilemma Zone
Detection
N/A
Signals
A form of pedestrian “WALK” phase
at a signalized intersection in which
all vehicular traffic is required to
stop, allowing pedestrians to safely
cross through the intersection in any
direction, including diagonally.
Cost $
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Pedestrian
Scramble
N/A
Signals
Prohibitions of left turns at locations
where a turning vehicle may confict
with pedestrians in the crosswalk
or where opposing traffc volume is
high. Reduces pedestrian interaction
with vehicles when crossing.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S15/NS16
Crash Reduction Factor 50%
Crash Type All
Expected Life 20
Federal Funding Eligibility 90%
Systemic Opportunity Medium
N/A
Prohibit
Left Turn
N/A
Appendix B: Countermeasure Toolbox, Additional LRSM Countermeasures 132
Signals
Certain timing, phasing, and control
strategies can produce multiple
safety benefits. Sometimes capacity
improvements come along with the
safety improvements and other times
adverse effects on delay or capacity
occur. The emphasis of improving signal
coordination for this countermeasure is
to provide an opportunity for slow speed
signal coordination. Coordinating signals
to allow for bicyclist progression, also
known as a ‘green wave,’ gives bicyclists
and pedestrians more time to safely cross
through the ‘green wave’ intersections.
Cost $$
LRSM ID S03
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 50%
Systemic Opportunity Very High
N/A
Signal
Interconnectivity
and Coordination
/ Green Wave
N/A
Signals
At certain hours (eg. late night) a signal
remains red for all approaches or certain
approaches until a vehicle arrives at the
intersection. If the vehicle is going faster
than the desired speed, the signal will not
turn green until after vehicle stops. If the
vehicle is going the desired speed the
signal will change to green before the
vehicle arrives. This signal timing provides
operational beneft to drivers traveling at
the desired speed limit. Can be paired
with variable speed warning signs.
Cost $$
LRSM ID R26
Crash Reduction Factor 30%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
Speed
Sensitive Rest
in Red Signal
N/A
Signals
Upgrading Signal Heads replaces
existing 8-inch signal heads with 12-
inch signal heads to comply with the
California MUTCD’s 2014 guidelines.
Upgrading signal heads improves safety
by providing better visibility of intersection
signals and by aiding drivers’ advanced
perception of upcoming intersections.
Cost $
LRSM ID S02
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
N/A
Upgrade
Signal Head
N/A
Richmond Local Roadway Safety Plan
133
Signing & Striping
An LED-Enhanced Sign has LED lights
embedded in the sign to outline the
sign itself or the words and symbols
on the sign. The LEDs may be set to
flash or operate in a steady mode. An
LED-enhanced sign improves safety
by improving the visibility of signs at
locations with visibility limitations or with
a documented history of drivers failing to
see or obey the sign (e.g. at STOP signs).
Cost $
Low Cost / Quick Build
alternative available
LRSM ID NS08
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity High
N/A
LED-Enhanced
Sign
N/A
Signing & Striping
Adding clear pavement markings
can guide motorists through complex
intersections. Intersections where
the lane designations are not clearly
visible to approaching motorists and/
or intersections noted as being complex
and experiencing crashes that could
be attributed to a driver’s unsuccessful
attempt to navigate the intersection
can benefit from this treatment.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID S09
Crash Reduction Factor 10%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Striping
Through
Intersection
N/A
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signing & Striping
Upgrading signs with fluorescent
sheeting replaces existing signs with new
signs that can clearly display warnings
by reflecting headlamp light back to
vehicles. Upgrading signs with fluorescent
sheeting improves safety by increasing
visibility of signs to drivers at night.
Cost $
Low Cost / Quick Build
alternative available
LRSM ID R22
Crash Reduction Factor 15%
Crash Type All
Expected Life 10
Federal Funding Eligibility 100%
Systemic Opportunity Very High
N/A
Upgrade
Signs with
Fluorescent
Sheeting
N/A
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 134
Bikeways
Connects bicyclists from the road to
the sidewalk or a shared use path.
Cost $
N/A
Bicycle Ramp
N/A
Bikeways
A traffic signal directing bicycle traffic
across an intersection. Separates
bicycle movements from conficting
motor vehicle, streetcar, light rail, or
pedestrian movements. May be applicable
for Class IV facilities when the bikeway
is brought up to the intersection.
Cost $$$
N/A
Bicycle Signal/
Exclusive
Bike Phase
N/A
Bikeways
Bike detection is used at signalized
intersections, either through use of
push-buttons, in-pavement loops, or
by video or infrared cameras, to call
a green light for bicyclists and reduce
delay for bicycle travel. Discourages
red light running by bicyclists and
increases convenience of bicycling.
Cost $$
N/A
Bike Detection
N/A
Richmond Local Roadway Safety Plan
135
Bikeways
Places a suggested bike lane within
the inside portion of a dedicated motor
vehicle turn lane. Lane markings delineate
space for bicyclists and motorists
within the same lane and indicate the
intended path for bicyclists to reduce
confict with turning motor vehicles.
Cost $
Low Cost / Quick Build
alternative available
N/A
Mixing Zone
N/A
Bikeways
This roadway treatment provides bicyclists
with a means of safely making a left turn
at a multi-lane signalized intersection
from a bike lane or cycle track on the
far right side of the roadway. In this way,
bicyclists are protected from the flow of
traffic while waiting to turn. Usage could
be mirrored for right-turns from a one-
way street with a left-side bikeway.
Cost $
Low Cost / Quick Build
alternative available
N/A
Two-Stage
Turn Queue
Bike Box
N/A
Bikeways
A sign placed on roads with lanes that
are too narrow to allow safe side-by-side
passing to indicate that bicyclists may
occupy the full lane. This discourages
unsafe passing by motorists.
Cost $
Low Cost / Quick Build
alternative available
N/A
Bicycles
May Use Full
Lane Sign
N/A
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 136
Intersections & Roadways
Uses paint and bollards to extend the
curb and slow left turns at intersections
of one-way to one-way or two-way
streets. Widening the turning radii of
left-turning vehicles expands the feld
of vision for drivers and increases
the visibility of pedestrians.
Cost $
Low Cost / Quick Build
alternative available
Left Turn
Enhanced
Daylighting/
Slow Turn
Wedge
Intersections & Roadways
A painted median with plastic posts
between the two directions of travel.
Reduces vehicular speeding and
discourages risky turning movements,
increasing pedestrian safety.
Cost $
Low Cost / Quick Build
alternative available
Paint and
Plastic Median
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=34
Intersections & Roadways
Mini circles use paint and soft hit posts
to replace stop-controlled intersections
with a circular design that slows trafc
and eliminates left turns, also reducing
confict points with pedestrians. Also
helps traffic flow more efficiently.
Cost $
Low Cost / Quick Build
alternative available
Paint and
Plastic Mini
Circle
Richmond Local Roadway Safety Plan
137
Intersections & Roadways
A roadway treatment that restricts
through vehicle movements using
physical diversion while allowing
bicyclists and pedestrians to proceed
through an intersection in all directions.
Cost $
Low Cost / Quick Build
alternative available
Partial Closure/
Diverter
Other Reference Information
Evolution of the Protected Intersection, Alta
Planning and Design, December 2015. https://
altaplanning.com/wp-content/uploads/Evolution-
of-the-Protected-Intersection_AL TA-2015.pdf
Intersections & Roadways
Protected intersections use corner
islands, curb extensions, and colored
paint to delineate bicycle and pedestrian
movements across an intersection. Slower
driving speeds and shorter crossing
distance increase safety for pedestrians.
Separates bicycles from pedestrians
Cost $$$
Low Cost / Quick Build
alternative available
Protected
Intersection
Other Reference Information
Note: some studies in CMF Clearinghouse show an
increase in crashes. See additional source below
showing decrease. (1) Perkins+Will Consultant
T eam. “Pedestrians at Multi-Modal Intersections.”
Better Market Street Existing Conditions & Best
Practices, Part Two: Best Practices 36-58, City &
County of San Francisco, San Francisco. http://
www.bettermarketstreetsf.org/about-reports-
existing-conditions.html (2) Bhatt, Shailen, Natalie
Barnhart, Mark Luszcz, T om Meyer, & Michael
Sommers. “Delaware T rafifc Calming Design Manual.”
Delaware Department of T ransportation, State of
Delaware, Dover, DE. https://nacto.org/wp-content/
uploads/2015/04/DE-T rafc-Calming-Manual_2012.
pdf (3) King, Michael R, Jon A Carnegie, and Reid
Ewing. “Pedestrian Safety through a Raised Median
and Redesigned Intersections.” Journal of the
T ransportation Research Board 1828 (1), 56-66,
T ransportation Research Board, Washington, DC.
https://trid.trb.org/view/663867 (4) Fitzpatrick,
Kay, Mark D Wooldridge, and Joseph D Blaschke.
“Urban Intersection Design Guide: Volume 1–
Guidelines.” T exas T ransportation Institute, T exas
A&M University System, T exas Department of
T ransportation, Austin, TX. https://static.tti.tamu.
edu/tti.tamu.edu/documents/0-4365-P2.pdf
Intersections & Roadways
Elevates the intersection to bring vehicles
to the sidewalk level. Serves as a traffic
calming measure by extending the
sidewalk context across the road.
Cost $$$
Raised
Intersection
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 138
Intersections & Roadways
Straightening crosswalks improves
sight lines, making pedestrians more
visible to oncoming drivers, and
may shorten the crossing distance,
reducing the length of time required for
pedestrians to cross an intersection.
Cost $
Low Cost / Quick Build
alternative available
Straighten
Crosswalk
Other Reference Information
The CMF Clearinghouse has limited research
related to vehicle/pedestrian crashes. See
additional reference: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=20
Other
Vehicles entering and exiting driveways
may confict with pedestrians and with
vehicles on the main road, especially at
driveways within 250 feet of intersections.
Closing driveways near intersections
with high collision rates related to
driveways may reduce potential conficts.
Cost $$
Access
Management/
Close Driveway
Other
Curbside management can better
prioritize reliable transit and safe
bicycling infrastructure, freight deliveries,
passenger pick-ups/drop-ofs,green
stormwater infrastructure, public
spaces, and parking management.
Cost $
Curbside
Management
Richmond Local Roadway Safety Plan
139
Other
Far-side bus stops are located immediately
after an intersection, allowing the bus
to pass through the intersection before
stopping for passenger loading and
unloading. Far-side stops encourage
pedestrians to cross behind the
bus for greater visibility and can
improve transit service reliability.
Cost $
Far-Side
Bus Stop
Other Reference Information
TRB Study on Setting Speed Limits
Other
Setting speed limits to reflect the
surrounding context of the roadway and
that meet with driver expectations can
help improve driver respect for speed
limits. Speed limits that appear inconsistent
may be ignored by the majority of drivers
and this may contribute to lack of respect
for speed limit and other traffic laws.
Cost $
Speed Limit
Reduction
Other Reference Information
FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Other
Relocating or removing utility poles
from within the clear zone alleviates the
potential for fixed-object crashes. If utility
poles cannot be completely eliminated
from within the clear zone, efforts can be
made to either relocate the poles to a
greater offset from the road or delineated.
Cost $$
Relocate Select
Hazardous
Utility Poles
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 140
Other
Upgrading Lighting to LED replaces
high-pressure sodium light bulbs with
LED light bulbs in street lights. Upgrading
Lighting to LED improves safety by
increasing the visibility of pedestrians in
crosswalks through greater color contrast
and larger areas of light distribution.
Cost $$
Upgrade
Lighting to LED
Other
A red light camera enforces traffic signal
compliance by capturing the image of a
vehicle that has entered an intersection
in spite of the traffic signal indicating red.
The automatic photographic evidence
is used by authorities to enforce traffic
laws and issue traffic violation tickets.
Cost $$
Red Light
Camera
Other Reference Information
Audible Push Button Upgrade and Extended
Time Pushbutton: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=52
Pedestrian Facilities
Push buttons must comply with the
Americans with Disability Act (ADA)
standards for accessibility. Pushbuttons
should be visible and conveniently
located for pedestrians waiting at
a crosswalk. Accessible pedestrian
signals, including audible push buttons,
improve access for pedestrians who
are blind or have low vision. DIB 82-06
includes accessibility design guidance.
Cost $
Audible
Push Button
Upgrade
Richmond Local Roadway Safety Plan
141
Other Reference Information
Audible Push Button Upgrade and Extended
Time Pushbutton: FHWA Pedestrian Safety
Guide and Countermeasure Selection System.
http://www.pedbikesafe.org/PEDSAFE/
countermeasures_detail.cfm?CM_NUM=52
Pedestrian Facilities
A pushbutton that can be pressed to
request extra time for using the crosswalk,
beyond the standard crossing time.
Ideal near senior-serving land uses.
Cost $
Extended Time
Pushbutton
Pedestrian Facilities
Separating drivers from bicyclists and
pedestrians using landscaping provides
more space between the modes and
can produce a traffc calming effect by
encouraging drivers to drive at slower
speeds, lowering the risk of crashing.
Cost $$
Landscape
Buffer
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=11
Pedestrian Facilities
An intersection treatment that relies on
sensors to detect when a pedestrian is
waiting at a crosswalk and automatically
triggers the pedestrian “WALK” phase.
Reduces crossings at inappropriate
times and ensures that pedestrians have
enough time to safely cross the roadway.
Cost $$
Pedestrian
Detection
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 142
Pedestrian Facilities
Removes existing crossing prohibitions
and provides marked crosswalk
and other safety enhancements for
pedestrians to cross the street.
Cost $
Low Cost / Quick Build
alternative available
Remove
Crossing
Prohibition
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=3
Pedestrian Facilities
T actile warning devices must be
detectable to visually impaired
pedestrians. Curb ramps must follow
the DIB 82-06 design guidelines.
Cost $$
Upgrade
Curb Ramp
Signals
Flashing yellow turn arrow alerts drivers
to proceed with caution and decide if
there is a sufcient gap in oncoming trafc
to safely make a turn. T o be used only
when a pedestrian walk phase is not
called. Protected-only phases should be
used when pedestrians are present.
Cost $$
Flashing Y ellow
Turn Phase
Richmond Local Roadway Safety Plan
143
Signals
Restricts left or right turns during
the pedestrian crossing phase at
locations where a turning vehicle
may confict with pedestrians in the
crosswalk. This restriction may be
displayed with a blank-out sign.
Cost $
Prohibit
Turns During
Pedestrian
Phase
Other Reference Information
Currently the CMF Clearinghouse does not include
specifc studies; however, permitting right-turns-
on-red shows an increase in ped/vehicle crashes.
Additional information is available at the FHWA
Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=49
Signals
Prohibiting right-run-on-red movements
should be considered at skewed
intersections, or where exclusive
pedestrian “WALK” phases, Leading
Pedestrian Intervals (LPIs), sight
distance issues, or high pedestrian
volumes are present. Can help prevent
crashes between vehicles turning
right on red from one street and
through vehicles on the cross street,
and crashes involving pedestrians.
Cost $
Low Cost / Quick Build
alternative available
Prohibit Right-
Turn-on-Red
Other Reference Information
(1) Evaluation of Pedestrian-Related Roadway
Measures, Pedestrian and Bicycle Information
Center, 2014. http://www.pedbikeinfo.org/cms/
downloads/PedestrianLitReview_April2014.
pdf (2) FHWA Manual for Selecting Safety
Improvements on High Risk Rural Roads
Signals
Provides a green arrow phase for
right-turning vehicles. Avoids conficts
between right-turning traffic and
bicyclists or pedestrians crossing
the intersection on their right.
Cost $$$
Separate Right-
Turn Phasing
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 144
Other Reference Information
FHWA Pedestrian Safety Guide and Countermeasure
Selection System. http://www.pedbikesafe.org/
PEDSAFE/countermeasures_detail.cfm?CM_NUM=45
Signals
Traffic signal cycle lengths have a
significant impact on the quality of the
urban realm and consequently, the
opportunities for bicyclists, pedestrians,
and transit vehicles to operate safely
along a corridor. Long signal cycles,
compounded over multiple intersections,
can make crossing a street or walking
even a short distance prohibitive and
frustrating. Short cycle lengths of 60–90
seconds are ideal for urban areas.
Cost $
Low Cost / Quick Build
alternative available
Shorten Cycle
Length
Signing & Striping
A raised pavement marker is a small
device attached to the road and used
as a positioning guide for drivers.
Cost $
Low Cost / Quick Build
alternative available
Painted
Centerline
and Raised
Pavement
Markers at
Curves on
Residential
Streets
Signing & Striping
Speed legends are numerals painted on
the roadway indicating the current speed
limit in miles per hour. They are usually
placed near speed limit signposts.
Cost $
Low Cost / Quick Build
alternative available
Speed Legends
on Pavement at
Neighborhood
Entries
Richmond Local Roadway Safety Plan
145
Signing & Striping
Restricts left-turns or right-turns during
certain time periods when there may
be increased potential for confict
(e.g., peak periods, school hours).
Cost $
Low Cost / Quick Build
alternative available
Time-Based
Turn Restriction
Signing & Striping
A network of signs that highlight
nearby pedestrian and bicycle facilities.
Can help to reduce crossings at
locations with poor sight distance or
limited crossing enhancements.
Cost $
Wayfinding
Non-Engineering: Better Data
Improve the accuracy, breadth, and
consistency of crash data by creating
a near-miss and unreported crash
database, developing a standardized
electronic reporting form for all crashes,
forming agreements with shared mobility
operators to acquire crash data, and/or
creating a multi-jurisdiction crash database
that can be updated by paramedics,
police, City staff, and hospitals.
Cost
Improve Crash
Data Collection
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 146
Non-Engineering: Education
Partner with local bike shops and other
partners to host events/fairs to educate
residents on bicycle safety. For example,
host rides to introduce residents
to new bicycle facilities as they are
opened; offer tune ups at safety fairs.
Cost
Bicycle Safety
Education
Events
Non-Engineering: Education
Launch targeted public education
campaigns for seniors, non-
English speaking populations,
or other vulnerable groups.
Cost
Education
Campaigns
for Vulnerable
Groups
Non-Engineering: Education
Implement pilot demonstration safety
projects. Projects can either be
implemented on a temporary basis
(tactical urbanism) or permanent basis
with room for modification (quick builds).
Cost
Pilot
Demonstration
Safety Projects
Richmond Local Roadway Safety Plan
147
Non-Engineering: Maintenance
A smoothly paved surface free of debris
enhances safety for vehicles and bicyclists.
Cost
Keep
Roadways
Clear of Debris
Non-Engineering: Policies
and Programs
Update policies, standards, and guidelines
on topics such as signal timing, street
design, street lighting, complete
streets, and pedestrian crossings to
incorporate current best practices
and improve safety for all modes.
Cost
Update City
Policies and
Standards
Non-Engineering: Policies
and Programs
Develop a neighborhood slow zone
program to allow neighborhoods to
request treatments to slow motor
vehicles to 15 to 20 mph using traffic
calming features, signs, and markings.
Selected locations are typically in
areas serving children, seniors, public
transit users, commercial activity,
and pedestrian/bicycle activity.
Cost
Neighborhood
Slow Zones
Appendix B: Countermeasure Toolbox, Additional Non-LRSM Countermeasures 148
Non-Engineering: Policies
and Programs
When developing a program of targeted
enforcement and deterrence, use collision
history and corridors on the High Injury
Network as one criterion for where to
concentrate enforcement efforts. Add extra
patrols to look for distracted drivers as part
of a statewide distracted driving campaign,
with focus on where data indicates that
the most traffic safety benefit can be
realized. Implement deterrence policies
that are highly visible, such as publicized
sobriety checkpoints, saturation patrol, and
other forms of high visibility enforcement
that are effective for safety outcomes.
Cost
Targeted
Enforcement
and Deterrence
Local Road Safety Plan (LRSP)
City Council Meeting
5/24/22
1 Page 807 of 1089
Travel Safe Richmond
OVERVIEW OF ROADWAY SAFETY
Travel Safe Richmond is a two-pronged
approach to improving roadway safety
for all users
• Local Roadway Safety Plan
• Bike and Pedestrian Action Plan
2 Page 808 of 1089
Agenda
• Overview of an LRSP
• State of Roadway Safety in Richmond
• Outreach
• Safety Vision for Richmond
• Collision Profiles
• Priority Corridors
3 Page 809 of 1089
What is a Local
Road Safety
Plan (LRSP)?
• Crash data review
• Trend identification
• Countermeasure
selection
• Project development
4 Page 810 of 1089
State of Roadway
Safety in Richmond
5 Page 811 of 1089
Severity of
Collisions
SAFETY IN RICHMOND
• 142 collisions where
victims were killed or
severely injured(KSI)
between 2015 and
2019
• On average, 6 people
are killed each year
142,
8%
1531,
92%
Fatal & Severe Collisions
All Other Injury Collisions6 Page 812 of 1089
Injury Collisions By
Year
SAFETY IN RICHMOND
100
200
300
400
500
2015 2016 2017 2018 2019
Number of Collisions
Vehicle Collisions Pedestrian Collisions Bicycle Collisions7 Page 813 of 1089 Collisions by Mode
(2015-2019)
SAFETY IN RICHMOND
80%
7%
13%
All Injury Collisions
61%8%
30%
Fatal & Severe Collisions
Vehicle Collisions
Bicycle Collisions
Pedestrian Collisions
8 Page 814 of 1089
9 Page 815 of 1089
Outreach
Community workshops
Stakeholder meetings
Interactive Webmap
Draft Plan review
Source: City of Richmond
10 Page 816 of 1089
“Traffic safety impacts the health and
comfort of all those who live and
travel in the City of Richmond. The
implementation of this plan is a step
towards making the transportation
system safer and more equitable for
users of all transportation modes.”Vision Statement
11 Page 817 of 1089
Goals
VISION STATEMENT AND GOALS
Reduce fatal and serious injury collisions, particularly those involving people walking and biking.
Reducing Collisions
Ensure equitable traffic safety investments in neighborhoods needing them most.
Equity
Enhance roadway crossings, especially near schools and other high pedestrian activity areas, to promote and support safe travel for people walking and biking.
Crossings
Improve the visibility of roadway and sidewalk users traveling at night.
Nighttime Visibility
Encourage safe driving practices (such as driving at lower speeds, obeying railroad crossing controls, and avoiding driving under the influence) through roadway design and outreach.
Safe Speeds, DUI
Prevention
Invest in the next generation of people in Richmond through climate-resilient transportation safety infrastructure, particularly near schools and in neighborhoods.
Climate Resiliency
Improve post-crash care through increased multi-jurisdictional collaboration and appropriate emergency vehicle access.
Post-Crash Care
12 Page 818 of 1089
Unsafe Speeds
COLLISION PROFILE
• Trend: Killed or severely injured (KSI)
collisions involving speeding vehicles
hitting fixed objects mid-block
• Trend: speeding resulting in non-
severe rear ends at/near
intersections
• Countermeasures: road diet, traffic
calming
25%
of bicycle KSI
collisions
26%
of vehicle KSI
collisions
13 Page 819 of 1089
Driving Under the
Influence
COLLISION PROFILE
• Trend: KSI collisions involving
drivers under the influence
hitting fixed objects/parked
cars or driving the wrong way
• Countermeasures: rumble
strips, targeted outreach
16%
of pedestrian
KSI collisions
14%
of vehicle KSI
collisions
14 Page 820 of 1089
15-24 Age Group
COLLISION PROFILE
19%
of pedestrian
KSI victims
23%
of driver or
passenger KSI
victims
• Trend: 15-24 year olds (13% of
population) are the most
overrepresented age group in KSI
collisions
• Trend: 15-24 year olds are more
likely to be involved in collisions
involving vehicle right of way
violations and DUIs
• Countermeasures: targeted
education15 Page 821 of 1089
Stop Sign Violations
COLLISION PROFILE
• Trend: bicycle collisions and KSI
vehicle collisions involving stop
sign violations at two-way stop-
controlled intersections
• Countermeasures: All-way stop,
advanced stop bars
13%
of bicycle
collisions (all)
14%
of vehicle KSI
collisions
16 Page 822 of 1089
Left Turns at Signals
COLLISION PROFILE
• Trend: left-turning vehicles
striking pedestrians or other
vehicles at signalized
intersections
• Protected left-turn phase, left-
turn calming, high visibility
crosswalks
11%
of pedestrian
collisions (all)
7%
of vehicle KSI
collisions
17 Page 823 of 1089
Pedestrian ROW
Violations at
Uncontrolled Crossings
COLLISION PROFILE
• Trend: KSI collisions involving
vehicles violating pedestrian
right-of-way at uncontrolled
crossings (two-way stop-
controlled intersections and
mid-block crossings)
• Enhanced crosswalks, beacons,
curb extensions, median refuge
21%
of pedestrian
KSI collisions
18 Page 824 of 1089
Pedestrians Crossing
Outside of Legal
Crossings
COLLISION PROFILE
• Trend: KSI collisions involving
pedestrians crossing outside of
legal crossings (mid-block or at
prohibited intersection
crossings)
• 38% of these collisions occurred
within one block of a bus stop
• Countermeasures: new
midblock crossings, pedestrian
barricades
13%
of pedestrian
KSI collisions
19 Page 825 of 1089
17%
of bicycle KSI
collisions
Contraflow Bike
Riding
COLLISION PROFILE
• Trend: bicyclists traveling in the
opposite direction of vehicle
traffic where there are no
dedicated bicycle facilities
• Bike facilities
20 Page 826 of 1089
Emphasis Areas
Locations:
• 23rd Street north of Grant Avenue
• 23rd Street and 22nd Street Couplet
• Barrett Avenue from Harbour Way to 24th Street
• Cutting Boulevard from Hoffman Boulevard to Carlson Boulevard 21 Page 827 of 1089
22 Page 828 of 1089
Emphasis Areas
Countermeasures:
• Road diet
• Bicycle facilities
• Enhanced crossings
• Traffic calming
• Protected left-turn phasing
23 Page 829 of 1089
Next Steps
Next Steps:
• Adopt LRSP – June/July 2022
• Apply for HSIP funding for near-term projects – September 2022 • Conduct additional planning & outreach for long-term projects – 2023 and beyond
• Implement LRSP strategies with all roadway projects - ongoing 24 Page 830 of 1089
July 19, 2022
Public Works
DATE: July 19, 2022
TO: Mayor Butt and Members of the City Council
FROM:
Joe Leach, PE, Director of Public Works
Patrick Phelan, Infrastructure Administrator
Subject:
Resolution Accepting and Appropriating the Urban Flood
Protection Grant Award
FINANCIAL IMPACT: This project is fully funded by a grant award of $1,598,844, which includes $30,000 for City staff time.
The City will be required to maintain the improvements
for 25 years. Account string: 40322931-400708
PREVIOUS COUNCIL
ACTION:
City Council adopted a resolution authorizing the grant application on July 6, 2021
STATEMENT OF THE
ISSUE:
On September 7, 2021, the California Natural Resources
Agency awarded the City of Richmond $1,598,844 for the
Flood Risk Reduction in the Rheem Creek Watershed
project. The funds must be accepted and appropriated in order to execute contracts and begin the project.
RECOMMENDED ACTION:
ADOPT a Resolution Accepting and Appropriating the
Urban Flood Protection Grant Award of $1,598,844 for
the Flood Risk Reduction in the Rheem Creek Watershed
Project – Public Works Department (Joe Leach/Patrick
Phelan 510-307-8111).
DISCUSSION:
AGENDA
REPORT
July 19, 2022
For over 20 years, the Fairmede neighborhood of Richmond and adjacent unincorporated Rollingwood neighborhood have suffered from flooding related to overflows from Rheem Creek. In 2019, American Rivers obtained a $274,515 planning and design grant from the California State Coastal Conservancy for the “Community- Based Ecological Solutions in Rheem Creek Watershed” project. In this project, American Rivers collaborated with the City, the Watershed Project, Restoration Design Group, and other local partners to complete technical studies and prepare community- supported plans to solve flooding issues along Rheem Creek. That project is nearing completion, and its deliverables include a topographic survey, 65% designs, a maintenance & monitoring plan, and permits submitted to the appropriate regulatory agencies. Project partners also did extensive community outreach to survey residents about their experience of the flooding and what they would like to see in the construction project. Due to Covid-19 closures, some of the in-person outreach was replaced with the creation of a “storybook” to visualize the history and future of the creek. This planning and design project made the City well prepared to seek implementation grants.
In June of 2020 the City, along with the above-mentioned partners, submitted an application to the Urban Flood Protection Grant Program requesting $1.6 million for final design and project implementation for a restoration project. Construction of the proposed restoration project will reduce flooding by removing invasive species and excessive sediment, grading a geomorphically stable channel, and planting native riparian vegetation to improve creek habitat. On July 6, 2021, the Richmond City Council passed and adopted Resolution No. 83-21, approving the application for grant funds. On September 7, 2021, the California Natural Resources Agency awarded the City $1,598,844 for the Flood Risk Reduction in the Rheem Creek Watershed Project.
On April 19, 2022, the City received a fully executed Grant Agreement number UF8814- 0 for the project. Now the City Council must authorize the City Manager, or designee, to accept and appropriate the funds.
The project will restore 0.5 miles of Rheem Creek to address creek overflows and flooding. It includes removal of invasive species, excessive sediment, grading a geomorphically stable channel and planting native riparian vegetation to improve creek habitat. Grant-funded elements include permitting; design and technical consultation; mobilization, demolition, and site preparation; plant establishment; removal of invasive species and excessive sediment; re-grading of the creek channel for geomorphic stability; reparation of two storm drains; and the installation of mulch, live stakes, broadcast seed, trees, fencing, gates, and signage. Permitting and final design will begin immediately; construction is planned for May to October of 2023, and project close out is required by March 2024.
July 19, 2022
DOCUMENTS ATTACHED:
Attachment 1 – Resolution
Attachment 2 – Grant Application
Attachment 3 – Resolution 83-21
Attachment 4 – Grant Award Letter
Attachment 5 – Fully Executed Grant Agreement
Reso. No.
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA,
ACCEPTING AND APPROPRIATING THE URBAN FLOOD PROTECTION GRANT AWARD OF $1,598,844 FOR THE FLOOD RISK REDUCTION IN THE RHEEM CREEK WATERSHED
PROJECT
WHEREAS, the City of Ric hmond (City) collaborated with American Rivers, The Watershed Project, and Restoration Design Group to apply to the Califor nia Natural Resources Agency Urban Flood Protection Grant Program for the Flood Risk Reduction in the Rheem Creek Watershed Project; and
WHEREAS, on July 6, 2021, the Richmond City Council adopted Resolution No. 83 - 21, approving the application for grant funds for the U rban Flood Projection Gran t and authorizing the City Manager, or their designee, to execute agreements with project pa rtners to complete the grant funded project; and
WHEREAS, on September 7, 2021, the California Natural Resources Agency awarded the City of Richmond $1,598,844 for the Flood Risk Reduction in the Rheem Creek Watershed Project; and
WHEREAS, the Flood Risk Reduction in the Rheem Creek Watershed Project will rehabilitate a 2,000 -foot section of Rheem Creek and will reduce floodin g in the surrounding neighborhood.
NOW, THEREFORE, BE IT RESOLVED that the City Council finds the above recitals are true an d correct and have s erved as the basis for the findings and approvals set forth in this Resolution.
BE IT FURTHER RESOLVED that the City Council hereby authorizes the City Manager, or their designee, to accept and appropriate the grant funds in the amount of $1,598,844 for Fiscal Year 2022-23.
BE IT FURTHER RESOLVED that the City hereby agrees to allocate the grant funds for a multi -benefit project to address flooding in urbanized areas in accordance with the Urban Flood Protection Grant Program Application Gui delines and the State of California Natural Resources Agency Grant Agreement #UF8814-0.
BE IT FURTHER RESOLVED that this resolution take s effect immediately upon its passage.
******************
Reso. No.
I certify that the foregoing resolution was passed and adopted by the Council of the City of Richmond at a regular meeting thereof held on July 19, 2022, by the following vote:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
CLERK OF THE CITY OF RICHMOND
(SEAL)
Approved:
Mayor
Approved as to form:
City Attorney
State of California }
County of Contra Costa : ss.
City of Richmond }
I certify that the foregoing is a true copy of Resolution No. , finally passed and adopted by the City Council of the City of Richmond at a regular meeting held on July 19, 2022
Pamela Christian, Clerk of the City of Richmond
Reso. No.
CLERK’S CERTIFICATE
I, Pamela Christian, City Clerk of the City of Richmond, do hereby certify as follows:
The foregoing resolution is a full, true, and correct copy of Resolution No. duly adopted at a regular meeting of the City Council of said City duly and regularly held at the regular meeting place thereof on the 19th day of July 2022, of which meeting all of the members of said City Council had due notice and at which a majority thereof were present; and that at said meeting said resolution was adopted by the following vote:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
An agenda of said meeting was posted before said meeting at City Hall, 450 Civic Center Plaza in the City of Richmond, California, a location freely accessible to members of the public, and a brief description of said resolution appeared on said agenda.
I have carefully compared the foregoing with the original on file and of record in my office, and the foregoing is a full, true, and correct copy of the original resolution adopted at said meeting.
Said resolution has not been amended, modified or rescinded since the date of its adoption and the same is now in full force and effect.
Dated: , 2022.
City Clerk of the
City of Richmond
[SEAL]
Print Application
RFP Title: Urban Flood Protection Grant Program - January 2020 Project Title: Flood Risk Reduction in the Rheem
Creek Watershed
Estimated Date of Completion: 01/01/2025
Funds Requested($): 1,639,344.00
Other Sources of Funds($): 0.00
Total Budget($): 1,639,344.00
Applicant
Organization: City of Richmond
Applicant Address: 3201 Leona , Richmond , CA -
94804
Federal Tax ID: 94600040
County: Contra Costa City/Town: Richmond
Project
Address: Fordham St & Greenwood Dr
Senate District 09
09,
Assembly District 15
01,
US Congressional District 11
11,
Project Description:
For over 20 years, the Rollingwood neighborhood in unincorporated western Contra Costa County has suffered from flooding related to overflows from Rheem Creek. In 2019, the City of Richmond collaborated with American Rivers, The Watershed Project, Restoration Design Group, and other local partners to complete technical studies and prepare community-supported plans to solve flooding issues along Rheem Creek. Now, the City is requesting CNRA funding for (1) Final Design and Project Implementation for a restoration project at the Rollingwood reach of Rheem Creek, and (2) Planning and Design for multi-benefit green infrastructure to improve watershed health and reduce peak flows and flooding in the disadvantaged communities downstream. Construction of the proposed restoration project will reduce flooding by removing invasive species and excessive sediment, grading a geomorphically stable channel, and planting native riparian vegetation to improve creek habitat.
Latitude:
37.966690000
Longitude: -122.330640000 Cordinates Represent: approximate center of project Coordinates Determined Using: google maps
Project Director (Applicant's Representative Authorized in Resolution) (Signature required at bottom of this page)
Name: Tawfic - Halaby Title: Project Director: Autho rized Representative Phone: 510-621-1612 Email: [email protected] .ca.us Project Manager - Person with day to day responsibility for project (if different from authorized representative) Name: Patrick - Phelan Title: Project Manager: Day t o day contact Phone: 510-307-8111 Email: [email protected] d.ca.us I certify that the information contained in this project application, including required attachments, is complete and accurate
Signed: ____________________________________________________________ Applicant's Authorized Representative as shown in Resolution Date: _________________
Print
Name: ____________________________________________________________ Title: _________________
Application Overview
RFP Title: Urban Flood Protection Grant Program - January 2020 Submitting
Organization:
City of Richmond
Submitting
Organization
Division:
Project Title: Flood Risk Reduction in the Rheem Creek Watershed Project
Description:
For over 20 years, the Rollingwood neighborhood in unincorporated western Contra Costa County has suffered from flooding related to overflows from Rheem Creek. In 2019, the City of Richmond collaborated with American Rivers, The Watershed Project, Restoration Design Group, and other local partners to complete technical studies and prepare community-supported plans to solve flooding issues along Rheem Creek. Now, the City is requesting CNRA funding for (1) Final Design and Project Implementation for a restoration project at the Rollingwood reach of Rheem Creek, and (2) Planning and Design for multi-benefit green infrastructure to improve watershed health and reduce peak flows and flooding in the disadvantaged communities downstream. Construction of the proposed restoration project will reduce flooding by removing invasive species and excessive sediment, grading a geomorphically stable channel, and planting native riparian vegetation to improve creek habitat.
APPLICANT DETAILS
Applicant
Organization:
City of Richmond
Applicant
Organization
Division:
Applicant Address: 3201 Leona , Richmond , CA - 94804
PROJECT LOCATION
Latitude : 37.966690000 Longitude: -122.330640000
County: Contra Costa
Estimated Date of
Completion:
01/01/2025
Project Address
(or nearest cross
street):
Fordham St & Greenwood Dr
Nearest City/Town: Richmond
Cordinates
Represent:
approximate center of project
Coordinates
Determined Using:
google maps
PROJECT BUDGET
Funds Requested($): 1,639,344.00
Other Sources of
Funds($):
0.00 Total Budget($): 1,639,344.00
Funding Program Applied
Proposition 68 - Urban Flood Protection Grant Program Yes Project Management Role Title First
Name
Last
Name Phone Fax Email
Name:
Division:
Address:
Federal
Tax ID:
Applicant Information
City of Richmond
3201 Leona Richmond, CA , 94804
94600040
Submitter
Name:
Submitter
Phone:
Submitter
Fax:
Submitter
Email:
Project Director: Authorized
Representative
Sr Civil
Eng/City of
Richmond
Tawfic Halaby 510-
621-
1612
510-
307-
8116
[email protected]
Project Manager: Day to day
contact
Infrastructure
Admin/City
of R
Patrick Phelan
510-
307-
8111
510-
307-
8116
[email protected]
Person Submitting Information
Lina Velasco
510-620-6841
510-620-6858
[email protected]
Legislative Information Primary Additional District(s)
Senate District 09 09,
Assembly District 15 01,
US Congressional District 11 11,
Contacts Name Phone Email
City of Richmond Patrick Phelan 510-307-8111 patrick_p [email protected] The Watershed Project Juliana Gonzalez 510-224-4085 ju [email protected] Cooperating Entities Role Name Phone Email
There are no COOPERATING ENTITIES to display.
Pre Submission Attachment Title Phase Submission
Period Date & Time
1.1 Rheem Creek Project Proposal Form Signature Page PHASE1 PRE SUBMISSION 6/15/2020 12:38:49 PM
1.2 Rheem Creek Photographs PHASE1 PRE SUBMISSION 6/15/2020 11:19:25 AM
1.3 Rheem Creek Cost Estimate PHASE1 PRE SUBMISSION 6/15/2020 12:32:15 PM
1.4 Rheem Creek Community Engagement Summary PHASE1 PRE SUBMISSION 6/15/2020 9:46:04 AM
1.5 Rheem Creek Site Plan PHASE1 PRE SUBMISSION 6/15/2020 9:35:48 AM
Download all Pre Submission Attachments
Post Submission Attachment Title Phase Date & Time Attac hed
No Post Submission Attachments Available to Display
Post Award Attachment Title Phase Date & Time Attached
No Post Award Attachments Available to Display
Questionnaire - Phase1
STEP 1: PROJECT PROPOSAL
Please go to http://resources.ca.gov/grants/ufp/ to access the program guidelines and find the templates to upload on the Attachments tab.
PROJECT SUMMARY
Describe the discrete project including expected project deliverables and current site conditions.
Answer: Located in western Contra Costa County, Rhe em Creek flows through a highly urbanized watershed impacted by degraded ecosystems, localized flooding, poor water quality, and extreme urban temperatures before it reaches the San Pablo Bay. The watershed is home to disadvantaged and low- income communities with few resources to address these challenges, so there is a critical need for a community-supported, nature-based approach to urban flood protection that provides multiple benefits.
Flooding in Upper Rheem Creek, particularly in the Rollingwood neighborhood, exemplifies this issue.
For over 20 years, this community has suffered from repeated flooding related to creek overflows. Due to its location at the boundary of multiple jurisdictions, the Rollingwood reach has long been neglected and is choked with invasive vegetation, leading to sediment build up, obstructed channels, and worsening flood conditions.
The City of Richmond is currently working with American Rivers, The Watershed Project, Restoration Design Group and other local partners to help solve the flooding issues in the Rollingwood neighborhood. In 2019, the team obtained a planning and design grant from the California State Coastal Conservancy (SCC). The scope of work included community engagement activities, a topographic survey, hydraulic analysis, Preliminary Design plans (65% complete Construction Documents), permits submitted to regulatory agencies, and a restoration opportunities analysis report.
The resulting Preliminary Design plans will be completed this fall and submitted for regulatory permits.
The City is requesting CNRA funding for the "Flood Risk Reduction in the Rheem Creek Watershed" project which includes two primary components: (1) Final Design and Implementation of the community-supported restoration project at the Rollingwood reach of Rheem Creek, and (2) Planning and Design for multi-benefit green infrastructure "interventions" upstream. These projects will reduce flooding, improve watershed health, enhance aesthetics and improve livability, provide economic opportunities, and engage the community in watershed stewardship activities.
TASK 1: ROLLINGWOOD REACH - FINAL DESIGN
The interdisciplinary design team will obtain agency permits based on the Preliminary Design plans and prepare 100% Construction Documents for public bid and construction. In partnership with the City, The Watershed Project will continue to lead community outreach and engagement to keep residents informed about the final design and planned construction activities.
TASK 2: ROLLINGWOOD REACH - PROJECT CONSTRUCTION
The City will manage the construction of this Capital Improvements Project with support from consultants. Construction of the Rheem Creek Rollingwood reach restoration project will reduce flooding by removing invasive species and excessive sediment, grading a geomorphically stable channel, and planting native riparian vegetation to improve creek habitat. The scope of work also includes project fencing and funder acknowledgement and educational signage.
TASK 3: ROLLINGWOOD REACH - MONITORING & ADAPTIVE MANAGEMENT Under the SCC grant Scope of Work, the team developed and OM&M plan. We are requesting CNRA funding to conduct monitoring activities and post-project evaluation. Opportunities for employment and workforce development will be included in all project activities.
TASK 4: MULTI-BENEFIT GREEN INFRASTRUCTURE - PLANNING & DESIGN Project partners will plan and design a network of rain gardens and bioretention features that will improve watershed health, enhance ecological resilience, and reduce peak flows and intensity of urban flooding in the Rollingwood reach of Rheem Creek and disadvantaged communities downstream. The Watershed Project will lead a community-based design process to select 3-5 green infrastructure project sites, develop concept-level design plans, and educate participants through hands-on stewardship activities.
PROJECT QUESTIONS
Applicants must answer the following questions, as applicable. If a question does not apply to the project, indicate "Not Applicable" with a brief explanation. Do not leave blank fields.
Eligibility, Statutory Requirements and Project Need
1 Explain how the project addresses flooding in an urbanized area and will protect persons and property from flood damage. Include information on current conditions and a brief history of flooding on the project site.
Answer: Located in western Contra Costa County, Rhe em Creek flows through a highly urbanized watershed impacted by degraded ecosystems, localized flooding, poor water quality, and extreme urban temperatures before it reaches the San Pablo Bay. The watershed is home to disadvantaged and low- income communities with few resources to address these challenges. In addition to health, economic, and environmental issues, residents lack access to safe and verdant parks and open spaces for recreation and connection with nature. There is a critical need for a community-supported, nature- based approach to urban flood protection that provides multiple benefits.
Flooding in Upper Rheem Creek, particularly in the Rollingwood neighborhood, exemplifies this issue.
For over 20 years, this community has suffered from flooding related to creek overflows. In this reach, the creek emerges from a large culvert that drains steep developed hillsides in Richmond, and becomes a low-gradient, engineered, mostly open channel that travels about two miles through disadvantaged communities in unincorporated Contra Costa County, Contra Costa College, and the city of San Pablo before entering San Pablo Bay. Due to its location at the boundary of multiple jurisdictions, the Rollingwood Reach has long been neglected and is choked with invasive vegetation, leading to sediment build up, obstructed channels, and worsening flood conditions.
As the flood easement holder at this site, the City of Richmond is currently working with American Rivers, The Watershed Project, Restoration Design Group and other local partners to help solve the flooding issues in the Rollingwood neighborhood. In 2019, the team obtained a planning and design grant from the California State Coastal Conservancy (SCC). The scope of work included community outreach and engagement activities, a topographic survey of existing conditions, hydraulic analysis, Preliminary Design plans (65% complete Construction Documents), permits submitted to regulatory agencies, and a restoration opportunities analysis report. The resulting Preliminary Design plans will be completed and submitted for regulatory permits in the next 6-8 months.
The City is requesting CNRA funding for the "Flood Risk Reduction in the Rheem Creek Watershed" project which includes two primary components: (1) Final Design and Implementation of the community-supported restoration project at the Rollingwood Reach of Rheem Creek, and (2) Planning and Design for multi-benefit green infrastructure "interventions" upstream.
The goal of the Rollingwood Reach Final Design and Construction Project at Rheem Creek is to
reduce flooding by removing invasive species and excessive sediment buildup*, grading a geomorphically stable channel, and planting native riparian vegetation to shade out invasives and improve creek habitat. (*In some locations, the creek thalweg is higher than the adjacent street, leading to ongoing and worsening flood conditions.)
The goal of the Multi-Benefit Green Infrastructure Planning and Design component of our project is to reduce peak flows and flooding in the Rollingwood neighborhood while improving ecosystem conditions and climate resilience in the watershed as a whole. We are requesting funding for community-based planning and design activities for a network of upstream rain gardens and bioretention features. We will identify strategic locations for 3-5 projects and develop concept-level plans.
2 How does the project provide flood mitigation in accordance with applicable design storm requirements (local, state or federal standards)?
Answer: There is no governing design storm requirem ent for this reach of Rheem Creek. The current channel floods into people's yards, garages, and streets several times a year. When built in the 1950s, this reach of Rheem Creek had a capacity of approximately 100 cfs. Due to sediment accumulation, the channel capacity has reduced to approximately 10 cfs at its most constrained. The intent of the restoration actions is to increase the capacity to 50-100 cfs which is roughly equivalent to the 5- to 10- year peak flood under today's urbanized watershed conditions. 3 How will the project be implemented with Low Impact Development (LID) techniques? If not, describe why LID is not feasible.
Answer: Since our ability to intervene in the chann el itself is quite limited due to the narrow, confined creek channel surrounded by dense housing, we have determined that a network of upstream green infrastructure such as rain gardens and bioretention features are important interventions to reduce peak flow and minimize flood events in the Rollingwood neighborhood. These actions are identified in our Restoration Opportunities Analysis (from the SCC grant) and focus on four potential areas upstream of the Rollingwood neighborhood where green infrastructure can potentially be installed: a memorial park, a recreational park, a school, and sidewalk/streets that feed into the stormwater system contributing to flooding downstream. Funds from the CNRA grant would be used to work with the local community to select/prioritize project locations and design a network of green infrastructure projects that will reduce flooding downstream while providing local residents more opportunities to engage in and meaningful watershed stewardship activities. Grant deliverables will include Concept Designs for 3-5 multi-benefit green infrastructure projects.
4 Describe any innovative techniques to reduce flooding to be implemented in the project.
Answer: Multiple techniques will be utilized to red uce flooding and improve watershed function in the Rollingwood neighborhood: (1) restore a section of Rheem Creek to increase channel capacity, (2) establish adaptive management strategies and provide maintenance access, (3) select strategic locations and develop concept level plans for multi-benefit green infrastructure in the Rheem Creek watershed upstream of the Rollingwood Reach. These nature-based techniques are developed in partnership with the community and are intended to be low cost, low impact, low maintenance, and replicable design solutions.
The core of this grant request will provide construction funding to remove excessive sediment, grade a geomorphically stable channel, and plant native riparian vegetation along an urban creek. According to our flooding analysis, excessive sedimentation in the channel causes the bulk of the flooding in the Rollingwood neighborhood and is most likely due to construction during historical dense development in past decades. This indicates that ongoing sedimentation will not pose significant problems in maintaining the channel since the watershed is almost or completely built out, and any further development would require adherence to sediment control regulations. However, part of the project design includes a sediment basin that will also function as a small floodplain habitat - the only place for
this kind of intervention along this narrow, engineered channel between dense housing. The sediment basin/floodplain will serve as a way for the city of Richmond to address any ongoing sediment issues, should they arise, while also providing floodplain inundation/peak flow reduction and ecosystem benefits.
As noted in question #3, reduction in flooding will also be addressed by a community engagement process to plan and design a network of rain gardens and bioretention features to reduce peak flow in the downstream Rollingwood neighborhood.
5 How will the effectiveness of the project be monitored and assessed? Answer: Development of a well-designed adaptive man agement and monitoring plan and allocation of adequate funding to conduct monitoring, analyze data, and implement adaptive management is critical to the long-term success of any watershed restoration effort. The currently funded SCC grant includes the development of a community-based maintenance and monitoring plan that will include educational and economic opportunities for local students and residents. All monitoring activities in the CNRA-funded Final Design and Implementation Phase of the project will be based on the maintenance and monitoring plan developed during the SCC grant. The project team (American Rivers, RDG, and The Watershed Project) have considerable experience designing adaptive management and monitoring plans for restoration projects.
Monitoring will be focused on measuring success in terms of: (1) reductions in residential flooding; (2) community use, access, and perception of green spaces; and (3) ecosystem function. Flood reduction and community use metrics will primarily be measured through neighborhood surveys. Ecosystem function will be measured in terms of metrics such as vegetation survival and growth, canopy cover, and habitat surveys, and may include benthic macroinvertebrate surveys using the most recent SWAMP bioassessment or CRAM protocols.
6 Describe the multiple benefits offered by the project (e.g., economic, environmental, social, improved physical and mental health, etc.).
Answer: This project is designed to achieve multipl e benefits in low-income and disadvantaged communities, while providing an opportunity to reverse damage that began with the intensive urbanization of the watershed in the 1950s and to deepen the community's connection with and stewardship of the creek.
One of the project's primary aims is to reduce flood risks to households. For decades, flood control activities intended to protect residents have diminished the watershed's resilience and disabled its ecological and hydrological function. Today, many sections of Rheem Creek are engineered, trapezoidal channels choked with invasive vegetation, which flood during increasingly intense storms.
This project will reduce flood risk, while also improving ecological and hydrologic function.
The overall goal of this project is to use nature-based solutions to improve the ecological function of the Rheem Creek watershed while reducing flood risk, sequestering carbon, enhancing green space, and providing economic and education opportunities for low-income and disadvantaged communities.
The design maximizes carbon sequestration, enhances habitat and connectivity for multiple species, reduces the urban heat island effect, increases stormwater infiltration, and improves water quality with native vegetation and green infrastructure elements.
The creek planting plan focuses on native riparian trees resulting in a canopy cover that minimizes flood risk while providing shade, cover and habitat to both aquatic and terrestrial species. The final design will optimize the potential for greenhouse gas reduction and community benefits, in addition to regional flood reduction efforts.
Our community-based planning approach has helped forge long-term partnerships, build trust, and strengthen social cohesion. Residents are engaged in watershed restoration efforts and aware of long-
term stewardship needs and opportunities. Local residents, agencies, and other stakeholders are helping to facilitate nature-based solutions, restoration and multiple-benefit green infrastructure projects throughout the watershed. This project will improve neighborhood livability and increase a sense of community well-being.This low-income community has experienced flooding multiple times each year for the past 20 years and felt neglected and disheartened. Our approach and the resulting multi-benefit project shows that their community and government agencies care about their lives and homes.
This project provides economic benefits by reducing flooding and resulting flood damage to residential properties. The Watershed Project works with community partners, Contra Costa College and Vista High School to provide regular and ongoing educational opportunities serving the low-income and disadvantaged neighborhoods within the project area and the watershed, including environmental literacy programs. The Watershed Project provides career training, hands-on educational opportunities, and workforce development. Community-led organizations will be contracted to plant riparian trees and vegetation. The OM&M funding plan will be rooted in community input, and include ongoing maintenance contracts with community-led organizations like Urban Tilth.
This project contributes to greater public health. The project helps reduce stress/worry about potential flooding and resulting personal health and environmental impacts. Also, studies show that visual and audible access to even small patches of natural habitat reduces stress and engenders a sense of connectedness and well-being that lead to tangible health benefits. The leafy canopy and music of birdsong will help mask the noise of urban traffic from busy streets nearby. 7 If the project is serving either a disadvantaged or a severely disadvantaged community, specify which type of community and the tool used to make the determination.
Answer: The project serves an AB 1550 low-income co mmunity per CalEPA. According to the Community FactFinder listed in Appendix O, the project serves a Severely Disadvantaged Community. 8 If the project is serving a disadvantaged or severely disadvantaged community, explain how the project is serving the community and list the direct benefits provided. (See definition of Serving a Disadvantaged or Severely Disadvantaged Community in Appendix P of the Guidelines.) Answer: The project serves low-income and severely disadvantaged communities by reducing the risk of flooding that currently occurs multiple times each winter. Reduced flooding will have direct monetary and quality-of-life benefits to property owners and residents who will no longer have to defend their homes from rising waters nor worry about flooding during winter storms. Some residents have built concrete walls between their properties and the creek. Many residents set up sandbags during storms, and though sandbags can be acquired via local jurisdictions for free, residents may not know of these programs. Furthermore, setting up and removing sandbags can be strenuous and time consuming. The work of keeping flood waters out of a house can affect residents' ability to leave the house and go to their jobs. Lack of flooding and any associated damages will raise property values and ensure owners can receive full market rates for their investments should they want to sell.
The project will increase resilience to climate change and reduce pollution. Climate change will bring more erratic and larger rain events, which the neighborhood will be better prepared to handle if Rheem Creek has been rehabilitated, regraded to original design standards, and brought back into ecological function. Native plantings will shade the creek, helping stave off the regrowth of invasive plants and mitigating urban heat island effects. Any pollutants that are collected upstream of the project are spread around the affected area during flooding, so reducing flooding will keep these pollutants off the street. Green infrastructure such as bioretention features upstream of the project will sequester pollutants on site instead of flowing into the creek via stormwater pipes. These basins will also slow stormwater and reduce the frequency of future flooding.
This project includes multi-benefit urban greening that sequesters carbon and reduces energy usage by planting at least 700 native riparian plants and trees along 40,000 square feet of an urban creek.
The project terms include maintenance access for trees and vegetation.
Though the project does not include public access, the results of the creek rehabilitation and native habitat restoration will be most visible where the creek crosses under Fordham Street. This location is the border between the Fairmede neighborhood of Richmond, and the unincorporated Rollingwood neighborhood. It acts as a gateway between two neighborhoods and is also a common route for students traveling to nearby Contra Costa College. Dilapidated chicken wire fencing will be replaced with more attractive and permanent fences, through which the creek and its riparian habitat will be visible. This project promotes environmental education by including interpretive signage to engage the community and connect residents with their watershed. The Watershed Project provides regular and ongoing field-based educational opportunities through partnerships with Contra Costa College, nearby K-12 schools and community-based organizations.
As much as possible, the project will engage and hire local residents and organizations. The Watershed Project has already interviewed many residents to learn about their experiences and share information about the project. This work will continue as part of the rehabilitation project. Richmond staff have included Contra Costa College in the planning process and presented at the college sustainability club. Partnering with the college and other schools will create further educational opportunities. A local organization, Urban Tilth, will collaborate with The Watershed Project to manage the native planting and establishment via Urban Tilth's Watershed Technician Training Program and The Watershed Project's Green Careers Program.
9 If the project is not serving a disadvantaged or severely disadvantaged community, describe how the 25 percent match requirement will be met (private, federal, state, or local funding; in-kind services; etc.).
Answer: Requested funding is for improvements withi n and directly benefiting a Severely Disadvantaged Community (DAC). Requested funding for planning and design of a green infrastructure network proposed upstream of the DAC serve to improve water quality and reduce localized flooding occurring in the DAC due to conditions higher in the drainage area. 10 If the project is subject to the Stormwater Resource Planning Act, provide the name of the Storm Water Resource Plan (SWRP) or functionally equivalent plan that incorporates the project.
Answer: The Contra Contra Watershed Stormwater Reso urce Plan includes this Rheem Creek project. 11 If the project is subject to the Stormwater Resource Planning Act but is not included in a SWRP or functionally equivalent plan, explain why. Describe steps taken to incorporate the project into a new or existing SWRP or functionally equivalent plan and the anticipated timeline for plan completion or project incorporation.
Answer: The Contra Contra Watershed Stormwater Reso urce Plan includes this Rheem Creek project. 12 If applicable, how will the project impact communities upstream or downstream from the project site? Answer: This project reduces flood impacts on downs tream communities. Richmond neighbors who own the creek are upslope and do not experience flooding in their yards, homes, or along Shane Drive and most of Moyers Road. This distinction in ownership is important as neighbors in the unincorporated Contra Costa County community of Rollingwood, who do not own the creek, suffer from frequent flood impacts.
The proposed project provides an array of positive impacts to the disadvantaged communities upstream and downstream of the project site by removing invasive species and sediment to reduce public safety threats from flooding while providing habitat for fish and wildlife. Urban stream restoration, green infrastructure, and urban greening will help build local resilience to climate change in this highly vulnerable community. Revegetation helps improve habitat connectivity along the stream corridor
between the upper and lower watershed. This project will capture stormwater to reduce stormwater runoff, and reduce water pollution.
As with many urban streams, there is a critical need for a community-supported plan for improvements as well as a coordinated maintenance and management strategy. Coordinating multiple jurisdictions, maintenance, and access with limited resources has been a huge challenge in this community. This project demonstrates innovative solutions that can be replicated in similar local projects in nearby watersheds.
Finally, this project allows residents in an underserved area to connect with nature and enjoy healthy benefits near where they live, work, and play.
13 Explain how the project addresses the State's critical need to address flooding and how it is consistent with the California Water Action Plan.
Answer: The creek currently floods dozens of homes several times a year in an AB 1550 low-income community and Severely Disadvantaged Community. The reduction of flooding is necessary to improve the quality of life for these neighbors and to protect the investment these families have made in their homes.
Two of the three California Water Action Plan objectives are the restoration of important species and habitat, and a more resilient, sustainable managed water resources system. The project will restore a corridor of creek and riparian habitat in an otherwise densely urban watershed. The project reach is upstream of the recently restored Dotson Family Marsh (a $14 million tidal marsh and upland ecotone habitat restoration project by the East Bay Regional Park District). By reducing overbank and neighborhood flooding in Rollingwood, the project will greatly reduce the number of flood events that collect oils, trash, and pollutants from streets, driveways, and yards and deliver them downstream to the Dotson Family Marsh and the San Pablo Bay.
14 For development projects, how will the project provide workforce education and training, contractor, and job opportunities for disadvantaged communities? If not applicable or practicable, explain why.
Answer: The Watershed Project will collaborate with the Conservation Corps and Urban Tilth Watershed Stewards to plant trees and vegetation along the riparian corridor, irrigate the plantings, and remove invasive species before each year's plantings. This will ensure that local interns are learning about restoration projects and gaining skills for maintenance and operations of these types of restoration sites. TWP will also collaborate with the Conservation Corps, Urban Tilth and other local community groups to maintain the riparian corridor. Monitoring will include neighborhood, Urban Tilth, and or Contra Costa College student activities and will be led by The Watershed Project in partnership with Contra Costa College.
15 For development projects, describe how the following is included in the project design. If not feasible, explain why:
a. Efficient use and conservation of water supplies.
b. Use of recycled water.
c. Storm water capture to reduce storm water runoff, reduce water pollution and/or recharge groundwater supplies.
d. Provision of safe and reliable drinking water sup plies to park and open-space visitors.
Answer: a. Efficient use and conservation of water supplies.
For the Rheem Creek Rollingwood Reach of the project, we anticipate that any irrigation needed will be temporary or the plants will be hand watered during the plant establishment period (three years).
Appropriate native riparian plants will be utilized to take advantage of existing site water from the creek and high water table. The project will avoid drip or spray irrigation systems due to the excessive costs.
Spray irrigation would also encourage invasive species.
The plant palette for the rain gardens and green infrastructure features will be designed for low maintenance and drought tolerance. Designs will include native and low-water use plants, deep mulching and soil amendments, and efficient irrigation design to meet WELO standards. b. Use of recycled water.
We do not anticipate the use of recycled water for temporary irrigation, given the proximity to the creek. c. Storm water capture to reduce storm water runoff, reduce water pollution and/or recharge groundwater supplies.
The project will include planning and designing of a network of rain gardens and bioretention features in the upper watershed that will reduce peak flows and water pollution in the downstream Rollingwood neighborhood.
d. Provision of safe and reliable drinking water supplies to park and open-space visitors.
No public drinking fountains are proposed as part of this project. More broadly, this project does contribute to water supply, watershed health, and water quality in the creek and San Pablo Bay. 16 What will happen to the project if grant funding is not awarded (e.g., loss of matching funds, impacts on overall project vision, project momentum, timing difficulties, etc.)? Answer: This project is poised to take advantage of a confluence of opportunities. Without CNRA funding, these advantages will diminish, carbon sequestration enhancement will not occur, and the low-income residents will be left to continue grappling with chronic flooding that will likely worsen under climate change. In 2007, Natural Heritage Institute completed an assessment of Rheem Creek watershed, which identified general needs and opportunities and included community visioning events; however, it did not include project-specific surveys or designs. American Rivers and our partners have come together to build on this foundation by focusing on the high-priority actions needed along specific stretches of the creek. The Coastal Conservancy provided critical initial funding for the partners to complete planning and design for the Rollingwood reach of Rheem Creek. The SCC-funded project conducted significant outreach in the community and the topographic survey involved light vegetation removal in the creek. The community has finally seen the City of Richmond take action on the flooding issues, but without construction funding, no real change will be seen. The community may feel like they have been let down again. Positive relationships that have been built over the last year may wither.
CNRA support at this time for the high-priority Rollingwood flood reduction project would allow the project team to advance other local opportunities identified in the Restoration Opportunities Analysis developed under the SCC-funded grant, such as five creekside acres owned by the City of San Pablo, on which new development could include beneficial elements such as a creek setback and restoration of floodplain and riparian habitat. Given the current pandemic and economic impacts, we look forward to future grant opportunities and economic incentives to build climate resilience. We want to plan and design green infrastructure projects now so that they are ready for implementation should future opportunities arise. If the critical early on-the-ground steps proposed here are not funded, such opportunities could be lost.
Statutory and Program Priorities
17 For development projects, what is the status of applicant's consultation with the California Conservation Corps or a certified community conservation corps about the project? Answer: We have sent our consultation forms to the Conservation Corps and have exchanged emails with Prop 68 Community Corps staff to identify the local Corps our project team has already worked with. Our
team worked with the Conservation Corps in the SCC-funded planning & design project to remove vegetation in preparation for the topographic survey. We anticipate that the Corps would also help with site clearing and weed removal in preparation for construction work as well as planting in the riparian corridor in coordination with local non-profit organizations. 18 For development projects, describe any water efficiencies, storm water capture for infiltration or reuse, or carbon sequestration and greenhouse gas emissions reduction features included in the project design. If not feasible, explain why.
Answer: The planting plan that is being developed f or the Rollingwood Reach with community engagement under the SCC grant is using the Urban and Community Forestry Calculator Tool and i-Tree Planting Calculator to quantify specific carbon sequestration and usage reduction effects of a range of trees typically used in urban settings. This allows us to calculate greenhouse gas sequestration provided by various native trees, and design the planting plan to maximize carbon sequestration while incorporating residents' preferences for different types of trees.
Designs incorporate Water Efficient Landscape Ordinance (WELO) standards to ensure that the project is sustainable, low maintenance, and requires very little water.
The multi-benefit green infrastructure component of the project will include a community-based engagement process for planning and designing a network of rain gardens and bioretention features in the upper watershed that will reduce peak flows and reduce water pollution in the downstream Rollingwood neighborhood. The resulting designs will integrate water efficiencies, stormwater capture and infiltration or reuse, trees for carbon sequestration and to reduce urban temperatures. Priorities and design details from the Urban Greening Master Plan and the Bicycle and Pedestrian Plan will be integrated to promote sustainable, walkable neighborhood streetscapes that support active transportation that contributes to GHG emissions reduction. 19 How does the project leverage private, federal, or local funding? Answer: The State Coastal Conservancy granted the p roject $274,515 to prepare 65% designs, submit permits and environmental compliance documentation, and engage local agencies and the residential community in planning and design activities. Project partners provided an in-kind match of $106,389.
Therefore, a total of $380,904 has already been allocated to this project. 20 If the project will result in displacement (e.g., unsheltered individuals, neighborhood gentrification, etc.), what solutions are included in the project design?
Answer: No displacement of unsheltered individuals or neighborhood gentrification is anticipated as a result of this project.
21 If the project is to be publicly accessible, what features in the design are intended to maximize safe and equitable access to the project?
Answer: As noted in the project description, the cr eek is on private property and therefore public access is limited. However, the creek is most visually accessible where it crosses under Fordham Street.
Fordham Street is a heavily used thoroughfare that also has considerable foot traffic of students walking to nearby Contra Costa College. The project will take advantage of this location to replace dilapidated chicken wire fences with more attractive and sturdy fencing, and to provide signage about the Rheem Creek ecosystem and other items of interest to the local community, that provide a historical and ecological context to the project. Instead of a mess of ivy and trash collected on fencing, passersby will have a view of a restored ecosystem, with bilingual signage to inform and engage. In addition, ongoing maintenance and monitoring activities will include students from Contra Costa College and neighborhood residents in annual vegetation and water quality monitoring, riparian vegetation planting, and ongoing trash clean up days.
Upstream rain gardens and bioretention areas will be placed in publicly-accessible locations such as streets, sidewalks, a school, a park and a memorial park. 22 How does the project utilize natural infrastructure? Answer: Rheem Creek in this reach is very narrow an d surrounded by dense housing, thus limiting design potential. However, the project will take advantage of some natural design elements to include single stemmed riparian trees and low vegetation that will allow floodwaters to pass more easily than multi- stemmed trees and bushes. The shade of these native riparian trees, along with aggressive weeding in the first few years and ongoing weeding in subsequent years, will limit invasive weed reestablishment using a natural systems approach. At the upper end of the project reach, a sediment basin will be constructed that will also serve as a small floodplain in an otherwise trapezoidal channel. This will allow for sedimentation maintenance if needed (though we do not expect this to be an issue in the future - see discussion in question #4) while also providing valuable floodplain habitat.
Rain gardens and bioretention features will be strategically designed throughout the watershed to reduce peak flows and improve stormwater quality. Potentially larger interventions at a memorial park, a recreation park, and a local school, along with a network of smaller interventions in residential streets and sidewalks, could significantly reduce peak flows and improve water quality. Some features will include watershed stewardship education and more equitable access to nature. 23 How does the project use multi-benefit approaches that meet multiple needs at once? Answer: The Rollingwood Reach implementation projec t reduces flood risk for a disadvantaged community that has suffered from annual flooding for over 20 years, improves water quality, shade, and habitat for a neglected urban creek, and sequesters carbon by planting riparian trees. The rain gardens and bioretention features will reduce peak flows, improve stormwater quality, and increase biodiversity in streets, schools and parks. Both the Rollingwood Reach Final Design and Implementation project and the green infrastructure planning project will engage the local community in creative problem solving and watershed education and stewardship, as well as provide economic opportunities through local jobs created from project development and ongoing watershed stewardship activities. 24 How was the project developed with local community engagement? Answer: As part of the SCC-funded planning & design project, in the summer of 2019, The Watershed Project conducted door-to-door surveys in English and Spanish of the neighbors adjacent to Rheem Creek in the Rollingwood and Fairmede-Hilltop neighborhoods. TWP staff, Green Collar Corps members, and high school interns visited 120 homes to inform neighbors of the project and ask about their experiences with flooding. Of the 120 homes visited, TWP interviewed 43 neighbors (36% response rate). Questions ranged from specifics regarding flood frequency and spatial patterns to general quality of life issues. The summary below covers questions and responses relating to flooding.
Residents reported that the flooding began approximately 20 years ago, and that the creek now floods 3-5 times per year. Flooding tends to last between 3 and 5 hours though some respondents said it lasts a few days. Approximately half (48%) of the residents surveyed responded that the flooding had impacted the quality of their lives. Residents noted property damage caused by the flooding including damage to cars, floors, fences, driveways, foundations, and other structures. Some neighbors identified damages in excess of several thousand dollars.
According to the neighbors interviewed, the most significant areas of flooding are the Annapolis/Moyers intersection at the upstream end of the project, along Greenwood Drive between Rollingwood Drive and Fordham Street, Fordham/Greenwood intersection, and the end of Greenwood Court. Residents reported that the street flooding begins upstream - water comes out of the storm drain in front of the EBMUD property near the upstream end of the project area and flows down the street toward Fordham and beyond depending on the amount of rainfall and flooding. Some neighbors have floodwaters flow