April 12, 2022

Document
Minutes
Meeting
April 12, 2022
Body
Ripon City Council
Pages
14
Original file
17.2 MB
Text extracted from the city's file for reading and search. Open the original on riponcityca.iqm2.com. That file is the official record.

• Due to the proximity of the 17,200 volts overhead high voltage lines, a minimum clearance of 12 feet is to be maintained from the overhead primary conductor to any walkable surface of the building and a minimum of 8 feet from any non-walkable surface per General Order

95. And a minimum horizontal clearance of 6 feet between the conductor and any part of the building upon which men may work is to be maintained per General Order 95. • The District's Electric Engineering Department is concerned about construction dirt/dust falling on MID electric facilities at the MID Stockton Substation during the construction phase of this project. The MID high voltage electric facilities require protection from dirt/dust. Do not dig new utility trenches, grade, level or dig building foundations without effective construction dust control measures in place. Windblown dirt/dust on electric facilities at the MID Stockton Substation may cause a power outage. • Existing electric service may not be adequate for the proposed project development. Prior to any construction a full set of construction plans must be submitted to Electrical Engineering Design Group. Please contact Modesto Irrigation District at (209) 526-7337 or (888) 335-1643 and ask for the Electrical Engineering Design Group to coordinate project/cost requirements.

The Modesto Irrigation District reserves its future rights to utilize its property, including its canal and electrical easements and rights-of-way, in a manner it deems necessary for the installation and maintenance of electric, irrigation, agricultural and urban drainage, domestic water and telecommunication facilities.

These needs, which have not yet been determined, may consist of poles, crossarms, wires, cables, braces, insulators, transformers, service lines, open channels, pipelines, control structures and any necessary appurtenances, as may, in District’s opinion, be necessary or desirable.

If you have any questions, please contact me at (209) 526-7447.

Sincerely,
Lien Campbell
Risk & Property Analyst
Copy: File
Lien Campbell

1.4.F.b
Packet Pg. 202 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA) PAGE: 1 OF 1
APP. BY:

APP. BY:

TAG NO:

DATE: 05/03/2021
700 Parallel Ave
City of Ripon
0feet 200feet 400feet 600feet 800feet
NO. REVISION
W

17.2-3W
69 17.2-3W 17.2-3W
69 17.2-3W 69 17.2-3W 69

17.2-4W
69 17.2-3W
69 PARCEL 3

68.33'
PARCEL 4
99 UP

LAURELWOOD LN

YAPLE CT

MEYENBURG AV

MCBRIAN DR

REYNOLDS DR

MANLEY RD

PARALLEL AV
2 6
5 6
5 4 1
4 2
7 8
3 5
6 4
1 3
2 3
2 4
7 1
6 5
1 2
3 6
2 1
5 3
1 SERVICE CONDUCTOR

UNDERGROUND TYPICAL
69,000 VOLTS

EXISTING TRANSMISSION

OVERHEAD
POLE

TYPICAL

FIBER OPTIC
CABLE

SECONDARY BOX

TYPICAL

EXISTING MID TRANSFORMER

UNDERGROUND TYPICAL

EXISTING SECONDARY

UNDERGROUND TYPICAL
17,200 VOLTS

EXISTING PRIMARY

UNDERGROUND

TYPICAL
17,200 VOLTS

EXISTING PRIMARY

OVERHEAD TYPICAL

EXISTING MID TRANSFORMER

OVERHEAD TYPICAL

SERVICE CONDUCTOR

OVERHEAD TYPICAL
5 T 2
6 2

17.2-3W
69 3

17.2-3W
1 69 17.2-3W
5 5
T

17.2-3W
6 1
1 2
T
3 4
5 69
8 17.2-3W

17.2-4W
1 2
3 4
7 17.2-3W
69 4
69 W
6 6

EXISTING MID TRANSFORMER

UNDERGROUND TYPICAL
T
1 T
5 SERVICE CONDUCTOR

OVERHEAD TYPICAL
7 2

EXISTING SECONDARY

UNDERGROUND TYPICAL

EXISTING MID TRANSFORMER

OVERHEAD TYPICAL
3 SERVICE CONDUCTOR

UNDERGROUND TYPICAL
17,200 VOLTS

EXISTING PRIMARY

OVERHEAD TYPICAL
69 POLE

TYPICAL
6 FIBER OPTIC
CABLE
17,200 VOLTS

EXISTING PRIMARY

UNDERGROUND

TYPICAL
2 SECONDARY BOX

TYPICAL
1 3
4 T
DATE
W.O. NO:

PROJECT:

DWG. BY:
victor0618

1.4.F.b
Packet Pg. 203 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA) S J C O G, Inc.
555 East Weber Avenue ● Stockton, CA 95202 ● (209) 235-0600 ● FAX (209) 235-0438 San Joaquin County Multi-Species Habitat Conservation & Open Space Plan (SJMSCP)

SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ)
ADVISORY AGENCY NOTICE TO SJCOG, Inc.

To: Ken Zuidervaart, City of Ripon, Community Development Department From: Laurel Boyd, SJCOG, Inc.

Date: April 26, 2021
-Local Jurisdiction Project Title: Major Site Review (SR21-36) Assessor Parcel Number(s): 261-160-10, -111
Local Jurisdiction Project Number: SR21-36
Total Acres to be converted from Open Space Use: Unknown Habitat Types to be Disturbed: Urban Habitat Land
Species Impact Findings: Findings to be determined by SJMSCP biologist.

Dear Mr. Zuidervaart:

SJCOG, Inc. has reviewed the project referral for the Major Site Review (SR21-36) Project. This project consists of a 264-unit self-storage facility with varying unit sizes. The total square footage of the units will be 48,675. Access to the site will be from one gated access point on Parallel Avenue. There will be a kiosk connected to a 300 square foot office that will operate the gate. The applicant is proposing three parking stalls, one of which will be ADA accessible. The project site is located at 700 Parallel Avenue, Ripon (APN: 261-160-10, -11).

The City of Ripon is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an amount and kind equal to that provided in the SJMSCP.

This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an information package. http://www.sjcog.org
Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements:
▪ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance ▪ SJMSCP Incidental take Minimization Measures and mitigation requirement:

1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date of the ITMMs.

2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs.

3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must:
a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond should be valid for no longer than a 6 month period); or b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or c. Dedicate land in-lieu of fees, either as conservation easements or fee title; or d. Purchase approved mitigation bank credits.

4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs first, the project applicant must:
a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or b. Dedicate land in-lieu of fees, either as conservation easements or fee title; or

1.4.F.b
Packet Pg. 204 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA) 2 | S J C O G , I n c .
c. Purchase approved mitigation bank credits.

Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. ▪ Receive your Certificate of Payment and release the required permit It should be noted that if this project has any potential impacts to waters of the United States [pursuant to Section 404 Clean Water Act], it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed on the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those mapped areas [pursuant to Section 404 and 401 of the Clean Water Act respectively] and permits would be required from each of these resource agencies prior to grading the project site.

If you have any questions, please call (209) 235-0600.

1.4.F.b
Packet Pg. 205 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA) 3 | S J C O G , I n c .

S J C O G, Inc.

San Joaquin County Multi-Species Habitat Conservation & Open Space Plan 555 East Weber Avenue ● Stockton, CA 95202 ● (209) 235-0600 ● FAX (209) 235-0438

SJMSCP HOLD
TO: Local Jurisdiction: Community Development Department, Planning Department, Building Department, Engineering Department, Survey Department, Transportation Department, Other: ___________
FROM: Laurel Boyd, SJCOG, Inc.

DO NOT AUTHORIZE SITE DISTURBANCE

DO NOT ISSUE A BUILDING PERMIT
DO NOT ISSUE __________ FOR THIS PROJECT
The landowner/developer for this site has requested coverage pursuant to the San Joaquin County MultiSpecies Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the Applicant has agreed to:
1) SJMSCP Incidental Take Minimization Measures and mitigation requirement:

1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs.

If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date of the ITMMs.

2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs.

3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must:
a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond should be valid for no longer than a 6 month period); or b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or c. Dedicate land in-lieu of fees, either as conservation easements or fee title; or d. Purchase approved mitigation bank credits.

4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs first, the project applicant must:
a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or b. Dedicate land in-lieu of fees, either as conservation easements or fee title; or c. Purchase approved mitigation bank credits.

Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called.

Project Title: Major Site Review (SR21-36)
Assessor Parcel #s: 261-160-10, -11
T _______, R______, Section(s): _____
Local Jurisdiction Contact: Ken Zuidervaart
The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take Minimization Measures are properly implemented and monitored and that appropriate fees are paid in compliance with the SJMSCP.

1.4.F.b
Packet Pg. 206 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA) P.O. Box 747, Ripon, CA 95366-0747 (Mailing)
11011 E. Highway 120, Manteca, CA 95336-9750
(209) 249-4600
May 20, 2021
Ken Zuidervaart
City of Ripon
259 N. Wilma Ave.

Ripon, CA 95366
Re: Ripon Self Storage
APN: 261-160-10 & 11

Dear Mr. Zuidervaart:

The South San Joaquin Irrigation District owns, operates and maintains an irrigation facility referred to as Lateral “U”, which is located adjacent to this project.

Upon review of the materials supplied, the new development will result in an encroachment of the District’s easement. Applicant shall submit an Application for Encroachment to District for approval. Improvement plans for both off-site and on-site improvements shall be submitted for review by the District’s Engineering Department.

Please feel free to contact me at 249-4620 if you have any questions.

Sincerely,

Forrest Killingsworth
Engineering Dept. Manager

1.4.F.b
Packet Pg. 207 Attachment: Exhibit A_Conditions of Approval (3234 : Parallel Avenue Self-Storage PIA)

1.4.F.c
Packet Pg. 208
Attachment: Exhibit B_Engineer's Estimate (3234 : Parallel Avenue Self-Storage PIA)

1.4.F.c
Packet Pg. 209
Attachment: Exhibit B_Engineer's Estimate (3234 : Parallel Avenue Self-Storage PIA) City Council
259 N. Wilma Avenue
Ripon, CA 95366
MEMO
To: Honorable City Council
From: Sarah Collins, Senior Civil Engineer
Date: 04/12/2022
Subject: Measure K Renewal Cooperative Agreement - Ripon Safe Routes to School Improvements
RECOMMENDED ACTION:

Approve and authorize the Mayor to sign the Measure K Renewal Cooperative Agreement No. (C-22-028) with the San Joaquin Council of Governments (SJCOG) in order to receive reimbursement for the Ripon Safe Routes to School Improvements Project from the Smart Growth Incentive Program funding category of the Local Transportation Improvement Plan (LTIP).

BACKGROUND
This project will upgrade four key roadways, including:

Second Street – Installation of a Class III bikeway (signage indicating preferred bike route) from South Wilma Avenue to Palm Avenue and a Class II bikeway (painted bike lane along the street) from Palm Ave to South Stockton Avenue. In addition, intersection improvements will be completed at S. Acacia Avenue, S. Locust Avenue, and S. Stockton Avenue, including curb extensions to reduce the length of crosswalks and high visibility markers or pavers at these intersections.

North and South Acacia Avenue – Installation of Class III bikeways from Doak Boulevard to the overcrossing at Highway 99.

Prospect Avenue – Installation of Class III bikeways as well as a crossing upgrade at the Frontage Road intersection, which will incorporate a Rectangular Rapid-Flashing Beacon (RRFB) and median refuge for pedestrians.

Ripona Avenue - Installation of Class II bikeways from Milgeo Avenue to California Street.

Below is a figure showing the locations of the project improvements.

1.4.G
Packet Pg. 210
On July 13, 2021, City Council adopted the Downtown Circulation Study Streetscape Improvements Master Plan, which included those improvements planned for Second Street.

DISCUSSION
This project was eligible for funds within the Smart Growth Incentive Program funding categories of the LTIP. SJCOG authorized Measure K Renewal funds to the City of Ripon through the LTIP. The City of Ripon was awarded $842,252 of Measure K Smart Growth Incentive Program funds for this project. In addition to the Measure K Funds, the City of Ripon was awarded $472,607 of Congestion Mitigation and Air Quality (CMAQ) funds. SJCOG requires the City of Ripon enter into a Cooperative Agreement that defines the reimbursement of the Measure K funds to City of Ripon, including an estimated project schedule and the terms of reimbursement.

Once this Agreement has been executed, City staff will start on the design, and construction is planned for 2023/2024.

1.4.G
Packet Pg. 211

FISCAL IMPACT
To summarize the funding sources for the Ripon Safe Routes to School Improvements project, please see table below.

Funding Sources: Amount
Measure K Smart Growth Incentive Funds $842,252
CMAQ $472,607
City of Ripon
(Streets and Roads Operating Fund) $330,000
TOTAL $1,645,000
The attached cooperative agreement with the San Joaquin Council of Governments allows for reimbursement of project costs associated with the Ripon Safe Routes to School Improvements Project with Measure K Smart Growth Incentive Program funds.

Attachments:

1. C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS

1.4.G
Packet Pg. 212

MEASURE K RENEWAL
COOPERATIVE AGREEMENT (C-22-028)
FOR

RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS

This Cooperative Agreement (“Agreement”) is made and entered into this 4th day of February, 2022 by and between the CITY OF RIPON (“Sponsor”) and the SAN JOAQUIN COUNCIL OF GOVERNMENTS acting as the Local Transportation Authority (“Authority”).

Sponsor and Authority may each be referred to herein as “Party” or collectively as “Parties.”

RECITALS
WHEREAS, Authority and Sponsor desire to enter into a Cooperative Agreement for funding of transportation improvements in San Joaquin County pursuant to the authority provided by San Joaquin County Local Transportation Improvement Plan and Ordinance (“LTIP”), which was approved by the voters of San Joaquin County on November 7, 2006; and WHEREAS, Sponsor desires to receive funding from the Authority for the particular transportation improvement project specified herein (“Project”); and WHEREAS, the Project is eligible for funds (as specified in the Measure K Renewal Strategic Plan) within the SMART GROWTH INCENTIVE PROGRAM funding categories of the LTIP; and
WHEREAS, the Authority is authorized under the LTIP to issue Measure K Renewal funds to Sponsor in an amount up to $842,252; and
WHEREAS, Authority shall issue reimbursement payments as provided in Section 2.1 to Sponsor pursuant to a request for reimbursement submitted by the Sponsor; however, the Sponsor understands that in no event shall reimbursement payments, when aggregated with previously approved reimbursement requests, exceed the Measure K Renewal commitment set forth in the Project Cooperative Agreement of $842,252 or 51.27%, whichever is less, of the total project costs as listed in Exhibit “A”; and
WHEREAS, any difference in cost which results in less than $842,252 of Measure K Renewal funds being spent on the Project shall be retained by the Authority for reallocation to any other eligible project; and
WHEREAS, Sponsor agrees to abide by the terms and conditions of the Authority as set forth herein for the receipt of Measure K Renewal funds; and WHEREAS, Authority agrees to provide funding for the transportation improvements of the Sponsor’s Project according to the terms and conditions set forth herein.

C-22-028
City of Ripon - Safe Route to School

Page 1 of 14 ends

1.4.G.a
Packet Pg. 213 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe NOW, THEREFORE, in consideration of the mutual promises and undertakings herein made and the mutual benefits to be derived therefrom, the parties hereto represent, covenant and agree as follows:

AGREEMENT

SECTION I
Covenants of Sponsor

1.1. Project Application. The Project description, scope of work, delivery schedule, corridor-specific cost by activity, anticipated amount and type of funds that will supplement Measure K Renewal funds, and the anticipated timing for release of Measure K Renewal funds and the Measure K Renewal “not to exceed” amount are specified in Exhibit “A,” and incorporated herein by this reference.

1.2. Change In Project Scope. A change in the Project scope as described in Exhibit “A” may not be implemented until it has been approved by the Authority. In no event will a change of scope result in the Authority reimbursing more than $842,252.

1.3. Eligible Reimbursement Costs. Eligible reimbursement costs shall be as specified in Exhibit “A” or as may be approved from time to time by the Authority pursuant to Section 1.2.

1.4. Right of Way Costs. It is understood that right-of-way acquisition costs are not eligible reimbursement costs of the Project.

1.5. Measure K Renewal Percentage Share Defined. For this Project, the estimated Measure K Renewal share of eligible reimbursements shall not exceed the lesser of $842,252 or 51.27% of the total project costs listed in Exhibit “A”.

1.6. Invoices and Progress Reports. Starting one month after the execution of this contract, Sponsor shall provide quarterly progress reports and may provide invoices as often as monthly for activities conducted over the prior unbilled month(s). These documents shall include the following specified information:

1.6.a. Copies of Consultant Invoices. Sponsor shall provide the Authority with one (1) copy of all invoices submitted to Sponsor by every consultant, subconsultant, contractor, or subcontractor performing work related to the Project.

1.6.b. Progress Reports. The quarterly progress reports shall include a brief description of the status of the Project, the work completed to date, including any issues that may impact Project schedule. This summary may be included on the invoices submitted to the Authority or be attached to those invoices.

1.7. Use of Funds. Sponsor shall use Measure K Renewal funds consistent with the Project scope of work, as described in Exhibit “A” or approved by the Authority pursuant to Section 1.2.

C-22-028
City of Ripon - Safe Route to School

Page 2 of 14 ends

1.4.G.a
Packet Pg. 214 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

1.8. Submittal of Bid Documents. All consultant contracts entered into pursuant to this capital funding agreement shall follow a competitive bidding process or give justification for using a sole source in a manner substantially similar to that described in the San Joaquin Council of Governments Financial Management & Accounting Processing Manual. When the contract is awarded, Sponsor shall provide to the Authority one (1) copy of the bid tabulation, and the bid schedule of the successful bidder, complete with unit prices and total award amount. All awarded contracts shall include performance bonds, labor and material bonds, a provision for liquidated damages, and may include any other penalty clauses for nonperformance of the contract. Sponsor shall provide copies to the Authority of all other executed contracts which relate to the Project scope, as described in Exhibit “A” or approved by the Authority pursuant to Section 1.2. Sponsor shall retain records pertaining to the Project for a four (4) year period following completion of the Project.

1.8.a Communication to Authority. Upon inquiry, Sponsor shall communicate, verbal or written, to Authority or its representatives with Project documents, invoices and progress reports, at any time of Project activities consistent to the provisions specified in Section I (1.6), (1.7), (1.8), and Section II (2.2).

1.9. Completion of Project. Sponsor shall be responsible for the timely completion of the construction of the Project and provide management of consultant and contractor activities, including responsibility for schedule, budget and oversight of the services, consistent with the scope of work. Since Sponsor is responsible for project management and oversight, any and all costs which exceed $842,252 of the total eligible costs set forth in Exhibit “A” shall be the sole responsibility of Sponsor. This provision shall apply in all instances including situations where a change in scope has been approved by the Authority pursuant to Section 1.2.

1.9.a. Letter of Project Completion. Sponsor shall provide a letter of project completion which includes final cost, revenues, schedule of activities, etc. This letter shall accompany the final invoice for payment from the sponsor to provide notice of project account closing by Authority.

1.10. Public Outreach. Sponsor shall be responsible for the development and administration of a public outreach effort to ensure public awareness and involvement in the project development and project delivery in construction. Sponsor shall include the Authority staff in the distribution list of all draft and final copy of the public outreach plan and materials of the public outreach activities. Sponsor shall provide the Authority timely email and postal distribution of all public outreach materials including but not limited to public meeting notices, postcards, and other meeting information. The public outreach plan shall identify the Authority in the list of interested stakeholders or project partners. The public outreach plan shall accompany in the first invoice for payment from the Sponsor. All other public outreach materials, meeting summary, and attendance list shall accompany in the invoice for the billing period which the public outreach was performed.

1.11. Excess Costs. In the event the actual Project cost exceeds the estimate shown in Exhibit “A,” this amount will be considered an excess cost. Sponsor is solely responsible for all costs over the amount identified in Section 1.5.

C-22-028
City of Ripon - Safe Route to School

Page 3 of 14 ends

1.4.G.a
Packet Pg. 215 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

1.12. Errors and Omissions. Sponsor shall diligently monitor and manage all aspects of the Project and shall aggressively pursue any and all remedies, including full restitution and damages from any consultant, contractor, or sub-contractor and their insured and sureties suspected of any acts errors, or omissions committed during business activities that economically damage the project.

1.13. Provision of Signs. Sponsor shall install signs approved by the Authority consistent with the specifications set forth in Exhibit “B” of this Agreement, attached hereto and incorporated herein by this reference. Signs shall be posted at both ends of the project boundaries for visibility to motorists traveling in either direction.

SECTION II
Covenants of Authority

2.1. Reimbursement Payments. The Authority shall make reimbursement payments to Sponsor for all eligible Project costs. To receive monthly reimbursement payments for work completed on the Project, Sponsor shall comply with the following reimbursement procedures:

2.1.a. Deadline to Submit Reimbursement Requests. All invoices and progress reports shall be submitted to Authority on or before 5:00 p.m. on the tenth (10th) calendar day of the month in which the Sponsor requests reimbursement payments. Authority shall issue reimbursement payments to Sponsor on or before the last day of the month for all timely submittals.

2.1.b. Late Submittals. If Sponsor fails to submit documents to Authority as set forth in Section 2.1.a, above, then Authority shall provide reimbursement payments for late submittals in the following calendar month.

2.1.c. Ineligible Costs. The Authority reserves the right to adjust current or future reimbursement payments to Sponsor if an invoice includes ineligible costs.

2.1.d. Reimbursement Amount. The amount of reimbursement payments to Sponsor shall be equivalent to the Measure K Renewal percentage share for each invoice submitted to the Authority. The total reimbursement percentage share for this Project shall not exceed the lesser of $842,252 or 51.27% and the available Measure K Renewal funds per fiscal year as specified in Exhibit “A”.

2.1.e. Suspension of Reimbursement. Reimbursement payments for the item(s) in question shall be suspended when a dispute arises as to whether or not the cost item(s) is eligible for reimbursement.

2.1.e.(1) Meeting. Once a dispute has occurred, the Authority shall arrange a meeting between the Authority and the Sponsor’s staff to discuss and attempt to resolve the dispute. If the invoice was received on or before 5:00 p.m. on the 10th day of the month, the meeting shall be held no later than the 20th day of the same C-22-028
City of Ripon - Safe Route to School

Page 4 of 14 ends

1.4.G.a
Packet Pg. 216 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe month. If the invoice was received after this date and time, then the meeting shall be held no later than the 20th day of the following month.

2.1.e.(2) Technical Advisory Committee. If an agreement cannot be reached at the meeting, then the Sponsor or the Authority shall have the option to take the dispute to the Authority’s Technical Advisory Committee, with the understanding that by doing so the reimbursement for the disputed cost item(s) will be delayed until a resolution of the matter is reached.

2.1.e.(3) Board Decision. If the Sponsor or the Authority disagrees with the resolution by the Technical Advisory Committee then the dispute shall be submitted to the San Joaquin Council of Governments Board for resolution. If the Board determines that the disputed cost item(s) is ineligible, the Authority shall not provide reimbursement payment to the Sponsor for the disputed item(s). If the Board determines that the disputed cost item(s) is eligible, then the Authority shall provide reimbursement payment to the Sponsor for the disputed cost.

2.1.e.(4) Reservation of Rights. By utilizing the above procedures, the Sponsor does not surrender any rights to pursue available legal remedies if the Sponsor disagrees with the Board decision.

2.1.f. Acceptance of Work Does Not Result In Waiver. Reimbursement payments do not result in a waiver of the right of the Authority to require fulfillment of all terms of this Agreement.

2.2. Right to Conduct Audit. The Authority shall have the right to conduct an audit of all Sponsor’s records pertaining to the Project at any time during the four (4) year period after completion of the Project.

SECTION III
Mutual Covenants

3.1. Term. This Agreement shall remain in effect until discharged or terminated as provided in Section 3.2 or Section 3.14.

3.2. Discharge. This Agreement shall be subject to discharge as follows:

3.2.a. Breach of Obligation. If a Party believes that the other is in breach of this agreement, that Party shall provide written notice to the breaching Party and the written notice shall identify the nature of the breach. The breaching Party shall have thirty (30) days from the date of notice to initiate steps to cure any breach that is reasonably capable of being cured. If the breaching Party diligently pursues cure, such Party shall be allowed a reasonable time to cure, not to exceed sixty (60) days from the date of the initial notice, unless a further extension is granted by the non-breaching Party. If the nonbreaching Party is not satisfied that there has been a cure by the end of the time for cure, the non-breaching Party may seek available legal remedies.

C-22-028
City of Ripon - Safe Route to School

Page 5 of 14 ends

1.4.G.a
Packet Pg. 217 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

3.2.b. Termination by Mutual Consent. This Agreement may be terminated at any time by mutual consent of the Parties.

3.2.c. Discharge Upon Completion of Project. Except as to any rights or obligations which survive discharge as specified in Section 3.13, this Agreement shall be discharged, and the Parties shall have no further obligation to each other, upon completion of the Project as certified by the Authority.

3.3. Indemnity. It is mutually understood and agreed, relative to the reciprocal indemnification of Authority and Sponsor:

3.3.a. That neither Authority, nor any officer or employee thereof, shall be responsible for, and Sponsor shall fully defend, indemnify and hold harmless Authority against any damage or liability occurring by reason of anything done or omitted to be done by Sponsor under the Agreement. It is also fully understood and agreed that, pursuant to Government Code Section 895.4, Sponsor shall fully defend, indemnify and hold the Authority harmless from any liability imposed for injury as defined by Government Code Section 810.8 occurring by reason of anything done or omitted to be done by Sponsor under this Agreement or in connection with any work, authority, or jurisdiction delegated to Sponsor under this Agreement.

3.3.b. That neither Sponsor nor any officer or employee thereof, shall be responsible for, and Authority shall fully defend, indemnify and hold harmless Sponsor against, any damage or liability occurring by reason of anything done or omitted to be done by Authority under or in connection with any work, authority or jurisdiction delegated to Authority under the Agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, Authority shall fully defend, indemnify and hold the Sponsor harmless from any liability imposed for injury as defined by Government Code Section 810.8 occurring by reason of anything done or omitted to be done by Authority under this Agreement or in connection with any work, authority, or jurisdiction delegated to Authority under this Agreement.

3.4. Notices. Any notice which may be required under this Agreement shall be in writing and shall be given by personal service, or by certified or registered mail, return receipt requested, to the addresses set forth below:

TO AUTHORITY:

Diane Nguyen
Executive Director
San Joaquin County Transportation Authority
555 E. Weber Avenue
Stockton, CA 95202
TO SPONSOR:

Kevin Werner
City Administrator
City of Ripon
259 N Wilma Avenue
Ripon, CA 95366
C-22-028
City of Ripon - Safe Route to School

Page 6 of 14 ends

1.4.G.a
Packet Pg. 218 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe Either Party may change its address by giving notice of such change to the other Party in the manner provided in this Section 3.4. All notices and other communications shall be deemed communicated as of actual receipt or after the second business day after deposit in the United States mail.

3.5. Additional Acts and Documents. Each Party agrees to do all such things and take all such actions, and to make, execute and deliver such other documents and instruments, as shall be reasonably requested to carry out the provisions, intent and purpose of the Agreement.

3.6. Integration. This Agreement represents the entire Agreement of the Parties with respect to the subject matter hereof. No representations, warranties, inducements or oral agreements have been made by any of the Parties except as expressly set forth herein, or in other contemporaneous written agreements.

3.7. Amendment. This Agreement may not be changed, modified or rescinded except in writing, signed by all Parties hereto, and any attempt at oral modification of this Agreement shall be void and of no effect.

3.8. Independent Agency. Sponsor renders its services under this Agreement as an independent agency and the Authority is also an independent agency under the Agreement. None of the Sponsor’s agents or employees shall be agents or employees of the Authority and none of the Authorities’ agents or employees shall be agents or employees of Sponsor.

3.9. Assignment. The Agreement may not be assigned, transferred, hypothecated, or pledged by any Party without the express written consent of the other Party.

3.10. Binding on Successors. This Agreement shall be binding upon the successor(s), assignee(s) or transferee(s) of the Authority or as the case may be. This provision shall not be construed as an authorization to assign, transfer, hypothecate or pledge this Agreement other than as provided above.

3.11. Severability. Should any part of this Agreement be determined to be unenforceable, invalid, or beyond the authority of either Party to enter into or carry out, such determination shall not affect the validity of the remainder of this Agreement which shall continue in full force and effect; provided that, the remainder of this Agreement can, absent the excised portion, be reasonably interpreted to give effect to the intentions of the Parties.

3.12. Counterparts. This Agreement may be executed in one or more counterparts and shall become effective when one or more counterparts have been signed by all of the Parties; each counterpart shall be deemed an original but all counterparts shall constitute a single document.

3.13. Survival. The following provisions in this Agreement shall survive discharge:

3.13.a. Sponsor. As to Sponsor, the following sections shall survive discharge:

Section 1.6 (obligation to apply funds to Project), Section 1.7 (obligation to provide copies and retain records), Section 1.8 (obligation to continue to manage Project).

C-22-028
City of Ripon - Safe Route to School

Page 7 of 14 ends

1.4.G.a
Packet Pg. 219 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

3.13.b. Authority. As to Authority, the following section shall survive discharge:

Section 2.2 (right to conduct audit).

3.13.c. Both Parties. As to both Parties, the following sections shall survive discharge: Section 3.2.a. (obligation which survives termination), and Section 3.3 (mutual indemnities).

3.14. Limitation. All obligations of Authority under the terms of this Agreement are expressly contingent upon the Authority’s continued authorization to collect and expend the sales tax proceeds provided by Measure K Renewal. If for any reason the Authority’s right or ability to collect or expend such sales tax proceeds is terminated or suspended in whole or part so that it materially affects the Authority’s ability to fund the project, the Authority shall promptly notify Sponsor, and the Parties shall consult on a course of action. If, after twenty-five (25) working days, a course of action is not agreed upon by the Parties, this Agreement shall be deemed terminated by mutual or joint consent. Any future obligation to fund this project or any other project or projects of Sponsor, not already specifically covered by separate Agreement, shall arise only upon execution of a new Agreement.

3.15. Attorneys’ Fees. Should any litigation commence between the Parties concerning the rights and duties of any Party pursuant to, related to, or arising from, this Agreement, the prevailing Party in such litigation shall be entitled, in addition to such other relief as may be granted, to a reasonable sum as and for its attorneys’ fees and costs of such litigation, or in a separate action brought for that purpose.

3.16. Time. Time is and shall be of the essence of this Agreement and each and all of its provisions in which performance is a factor.

3.17. Remedies Cumulative. No remedy or election of remedies provided for in this Agreement shall be deemed exclusive, but shall be cumulative with all other remedies at law or in equity. Each remedy shall be construed to give the fullest effect allowed by law.

3.18. Applicable Law. This Agreement shall be governed by, and construed and enforced in accordance with the laws of the State of California.

3.19. Captions. The captions in this Agreement are for convenience only and are not a part of this Agreement. The captions do not in any way limit or amplify the provisions of this Agreement and shall not affect the Project or interpretation of any of its provisions.

3.20. No Continuing Waiver. The waiver by any Party of any breach of any of the provisions of this Agreement shall not constitute a continuing waiver or a waiver of any subsequent breach of the same, or of any other provision of this Agreement.

3.21. No Rights in Third Parties. Nothing in this Agreement, express or implied, is intended to confer any rights or remedies under or by reason of this Agreement on any third party, nor is anything in this Agreement intended to relieve or discharge the obligation or liability of any third C-22-028
City of Ripon - Safe Route to School

Page 8 of 14 ends

1.4.G.a
Packet Pg. 220 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe party to any Party to this Agreement, nor shall any provision of this Agreement give any third party any right of subrogation or action over or against any Party to this Agreement.

3.22. Signatory’s Warranty. Each Party warrants to each other that he or she is fully authorized and competent to enter into this Agreement in the capacity indicated by his or her signature and agrees to be bound by this Agreement as of the day and year first mentioned above upon the execution of this Agreement by each other Party.

IN WITNESS WHEREOF, the undersigned Parties have executed this Agreement on the day and year first written above.

CITY OF RIPON SAN JOAQUIN COUNTY

TRANSPORTATION AUTHORITY
By:________________________ By:____________________________

DEAN UECKER
Mayor

LEO ZUBER
Chair
ATTEST:

By:________________________
ATTEST:

By:____________________________

LISA ROOS
City Clerk

DIANE NGUYEN, AICP
Executive Director
APPROVE AS TO FORM: APPROVE AS TO FORM:

By:________________________ By:____________________________

TOM TERPSTRA
City Attorney

STEVE DIAL
Deputy Executive Director / CFO

C-22-028
City of Ripon - Safe Route to School

Page 9 of 14 ends

1.4.G.a
Packet Pg. 221 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

EXHIBIT A
City of Ripon
Safe Routes to School Improvements

1. Project Name, Location:

Ripon Safe Routes to School Improvements
(See Attached Project Vicinity Map)

2. Project Sponsor, Contact Person, Phone Number:

City of Ripon
Sarah Collins, Senior Civil Engineer
(209) 599-0236

3. Project Scope of Work:

This project will upgrade four key roadways. Along Second Street, improvements include Class III bikeways from South Wilma Avenue to Palm Avenue and Class II bikeways from Palm Ave to South Stockton Avenue. At three intersections, curb extensions will be installed and existing crosswalks will be upgraded with high-visibility markings or pavers. Along North and South Acacia Avenue, Class III bikeways will be installed from Doak Boulevard to the overcrossing at Highway 99. Along Prospect Avenue, Class III bikeways will be installed as well as a crossing upgrade at the Frontage Road intersection, which will incorporate a RRFB and median refuge. Along Ripon Avenue, Class II bikeways will be installed.

This project is a high priority for the City. It will improve roadway conditions for bicyclists and pedestrians by improving safety, comfort and convenience along key central Ripon routes. This project will create a network of on-street bikeways to connect bicyclists to existing facilities around the perimeter and northern and downtown area, connect across Highway 99 by linking facilities to the existing bicycle and pedestrian overcrossing, and connect to local schools and community destinations in downtown Ripon.

4. Expected Time of Delivery of Overall Project:

Start Date Completion Date
Preliminary Design/ Environmental 4/1/2022 6/30/2022
Final Design 7/1/2022 7/14/2023
Right of Way Acquisition 9/1/2022 7/14/2023
Construction 2/1/2024 5/31/2024
C-22-028
City of Ripon - Safe Route to School

Page 10 of 14 ends

1.4.G.a
Packet Pg. 222 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

5. Estimated Project Cost (as applicable for each of the phases described above):

Measure K Amount Total Cost
Preliminary Design/ Environmental - $75,000
Final Design - $150,000
Right of Way Acquisition - $5,000
Construction $842,252 $1,415,000
C-22-028
City of Ripon - Safe Route to School

Page 11 of 14 ends

1.4.G.a
Packet Pg. 223 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe

6. Expected Timing for Release of Measure K Funds by Quarter:

FY 21/22 FY 22/23 FY 23/24
July - September - - -
October - December - - -
January - March - - $842,252
April -June - - -
TOTAL - - $842,252 $842,252

7. Source(s) and Amount(s) of Funds for Project
Amount Percentage
Measure K Smart Growth $842,252 51.27%
CMAQ $472,607 28.73%
City of Ripon $330,000 20%
TOTAL $1,645,000 100%

8. Project Vicinity Map (see attached):

C-22-028
City of Ripon - Safe Route to School

Page 12 of 14 ends

1.4.G.a
Packet Pg. 224 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! !
0 0.25 0.5
Miles
Project Locations
Proposed Crossing
Improvement
Proposed Class II Bicycle
Lanes
Proposed Class III Bicycle
Route
Existing Bicycle Facilities
Existing Class I Paths
Existing Class II Bicycle
Lanes
Existing Bicycle and
Pedestrian Overcrossing
! ! ! ! In Development Class I
Path
! ! ! ! In Development Class III
Bicycle Route
Destinations
School
Government Facility
Library
Community Facility
Cemetary
Park/Outdoor Recreation
Bus Facilities
Existing Bus Stop
Future Multi-Modal Rail
Transit Station
Bus Route
Highways
Railroads
Boundaries
Ripon Downtown
Boundary
City of Ripon Boundary
0 1 2
Miles
Project Locations
Crossing Improvements
Bicycle Facility
Improvements
City of Ripon Boundary
County Boundaries

RIPON CHRISTIAN

SCHOOLS
RIPON
HIGH
SCHOOL

RIPON ELEMENTARY

RIPONA ELEMENTARY

CITY HALL
& POLICE

DEPT RIPON

LIBRARY

BOESCH/

KINGERY
PARK

VERMEULEN PARK

RIPON CEMETARY

OAK GROVE PARK

JACK TONE

DRIVING
RANGE
San Joaquin County
Stanislaus County

HARVEST HIGH
SCHOOL

MUSEUMS SENIOR
CENTER
ANIMAL

SHELTER
ACACIA

PARK & COMMUNITY CENTER

STOUFFER PARK
S Acacia Ave
Jack Tone Rd
S Stockton Ave
S Wilma Ave
Second St
Ripona Ave
Milgeo Ave
Prospect
Ave
Fulton Ave
W Main St
Ruess Rd
S Locust Ave
Colony Rd
Ripon Rd
Fourth St
Doak Blvd

FUTURE MULTIMODAL TRANSIT

STATION
Stanislaus
County
San
Joaquin
County
EXTENT

OF TOP MAP
Ripon, Ca
EXTENT

OF BOTTOM

LEFT MAP

RIPON, CA

RIPON SAFE ROUTES TO SCHOOL

IMPROVEMENTS

PROJECT LOCATION MAP
Source: U.S. Census, ESRI. Map Produced August 2020.

C-22-028
City of Ripon - Safe Route to School

Page 13 of 14 ends

1.4.G.a
Packet Pg. 225 Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal Cooperative Agreement - Ripon Safe 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1234589 A ___________________Project Cost
10 Funded B
y Measure K
1112 (Other Funding Sources:)131415
4 Feet
Project Name
8 Feet
16 SJCOG Logo Project Name
Orange Pantone #1595 8" Upper case black lettering
Blue Pantone #2945 White background
White background Black outlineMeasure K Logo:36" x 34 " Project Cost, Matching Funds, Partner(s):Orange and blue lettering on white background 6" Upper case and 4" lower case black lettering White backgroundBlack outlineAll sign features to be reflectorized (engineer‐grade Scotchlite) Exhibit B
C-22-028
City of Ripon - Safe Route to School

Page 14 of 14 ends

1.4.G.a
Packet Pg. 226
Attachment: C-22-028 RIPON SAFE ROUTES TO SCHOOL IMPROVEMENTS (3368 : Measure K Renewal City Council
259 N. Wilma Avenue
Ripon, CA 95366
MEMO
To: Honorable City Council
From: Lisa Roos, City Clerk & Finance Director
Date: 04/12/2022
Subject: Claim - Abhijit & Amandeep Gill
RECOMMENDED ACTION:

The City’s claim administrator has investigated the submitted claim and is recommending the City Council reject the claim.

BACKGROUND:

Abhijit & Amandeep Gill submitted a claim to the City of Ripon on February 17, 2022 for damage done by a garbage truck to their basketball hoop in front of their home. They are seeking a total of $691.91 ($591.91 for the replacement of the basketball hoop and $100.00 for the installation fee).

DISCUSSION/ANALYSIS:

The City’s claim administrator, Doug Redifer, reviewed the claim submitted, pictures and video of the incident. Ripon Municipal Code states that no obstructions shall be place in “the public ways…” This includes “any post, pillar, pole or structure which stands or rests upon, within or in any public way”. Mr. Redifer states that there is no liability for this loss as the basketball pole and hoop were in the public sidewalk/street in violation of RMC 12.08.020. Furthermore, the claimant was aware of trash pickup every Tuesday and put the can under the hoop creating the hazard.

Accordingly, it is Mr. Redifer’s recommendation that this matter be submitted to the City Council for the claim to be rejected.

Packet Pg. 227
a
Packet Pg. 228
Attachment: Invoice 90432_Provost & Pritchard (3363 : Provost & Pritchard Consulting Group) b
Packet Pg. 229
Attachment: Invoice 90915_Provost & Pritchard (3363 : Provost & Pritchard Consulting Group) City Council
259 N. Wilma Avenue
Ripon, CA 95366
MEMO
To: Honorable City Council
From: Kevin Werner, City Administrator
Date: 04/12/2022
Subject: Oppose Initiative 21-0042A1
RECOMMENDED ACTION:

Staff is recommending the City Council oppose the Taxpayer Protection and Government Accountability Act (AG# 21-0042A1) and approve the attached resolution.

BACKGROUND:

In 2018, the Tax Fairness, Transparency and Accountability Act (AG# 17-0050A1), was being circulated to qualify for the November 2018 ballot. This initiative would have drastically limited local revenue authority. The measure was met with opposition and the measure’s proponents withdrew the initiative from the ballot in June 2018.

DISCUSSION/ANALYSIS:

On Jan. 4, 2022, the California Business Roundtable filed the Taxpayer Protection and Government Accountability Act (AG# 21-0042A1). This measure is far more detrimental to cities than the measure filed in 2018, because it would decimate vital local and state services to the benefit of wealthy corporations.

Generally, the Taxpayer Protection and Government Accountability Act limits voters’ authority, adopts new and stricter rules for raising taxes and fees, and makes it more difficult to hold violators of state and local laws accountable. The following summarizes specific concerns with the proposed legislation:
1) Limit voter authority and accountability
 Limits voter input. Prohibits local voters from providing direction on how local tax dollars should be spent by prohibiting local advisory measures.  Invalidates the Upland decision that allows a majority of local voters to pass special taxes. Taxes proposed by the Initiative are subject to the same rules as taxes placed on the ballot by a city council. All measures passed between January 2022 and

2.A
Packet Pg. 230
November 2022 would be invalidated unless reenacted within 12 months. 2) Restrict local fee authority to provide local services  Impacts franchise fees. Sets new standard for fees and charges paid for the use of local and state government property. The standard may significantly restrict the amount oil companies, utilities, gas companies, railroads, garbage companies, cable companies, and other corporations pay for the use of local public property. Rental and sale of local government property must be “reasonable” which must be proved by “clear and convincing evidence.”
 Except for licensing and other regulatory fees, fees and charges may not exceed the “actual cost” of providing the product or service for which the fee is charged. “Actual cost” is the “minimum amount necessary.” The burden to prove the fee or charge does not exceed “actual cost” is changed to “clear and convincing” evidence. 3) Restrict authority of state and local governments to issue fines and penalties for violations of law
 Requires voter approval of fines, penalties, and levies for corporations and property owners that violate state and local laws unless a new, undefined adjudicatory process is used to impose the fines and penalties.
4) Restrict local tax authority to provide local services  Requires voter approval to expand existing taxes (e.g., UUT, use tax, TOT) to new territory (e.g., annexation) or expanding the base (e.g., new utility service).  City charters may not be amended to include a tax or fee.  New taxes can be imposed only for a specific time period.  Taxes adopted after Jan. 1, 2022, that do not comply with the new rules, are void unless reenacted.
 All state taxes require majority voter approval.
 Prohibits any surcharge on property tax rate and allocation of property tax to state. 5) Other changes
 No fee or charge or exaction regulating vehicle miles traveled can be imposed as a condition of property development or occupancy.

Cal Cities, along with a broad coalition of local governments, labor and public safety leaders, infrastructure advocates, and businesses, strongly oppose this initiative.

2.A
Packet Pg. 231
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

RIPON OPPOSING THE TAXPAYER PROTECTION AND

GOVERNMENT ACCOUNTABILITY ACT
WHEREAS, an association representing California’s wealthiest corporations is behind a deceptive proposition aimed for the November 2022 statewide ballot; and WHEREAS, the measure creates new constitutional loopholes that allow corporations to pay far less than their fair share for the impacts they have on our communities, including local infrastructure, our environment, water quality, air quality, and natural resources; and WHEREAS, the measure includes undemocratic provisions that would make it more difficult for local voters to pass measures needed to fund local services and infrastructure, and would limit voter input by prohibiting local advisory measures where voters provide direction on how they want their local tax dollars spent; and
WHEREAS, the measure makes it much more difficult for state and local regulators to issue fines and levies on corporations that violate laws intended to protect our environment, public health and safety, and our neighborhoods; and
WHEREAS, the measure puts billions of dollars currently dedicated to state and local services at risk, and could force cuts to public schools, fire and emergency response, law enforcement, public health, parks, libraries, affordable housing, services to support homeless residents, mental health services, and more; and
WHEREAS, the measure would also reduce funding for critical infrastructure like streets and roads, public transportation, drinking water, new schools, sanitation, and utilities.

THEREFORE, BE IT RESOLVED that the City of Ripon, opposes Initiative 21-0042A1.

THEREFORE, BE IT FURTHER RESOLVED, that the City of Ripon will join the NO on Initiative 21-0042A1 coalition, a growing coalition of public safety, labor, local government, infrastructure advocates, and other organizations throughout the state.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Ripon this 12th day of April, 2022, by the following vote:

2.A
Packet Pg. 232
RESULT: DEFEATED [2 TO 3]
MOVER: Leo Zuber, Council Member
SECONDER:Dean Uecker, Mayor
AYES: Dean Uecker, Leo Zuber
NAYS: Michael Restuccia, Daniel de Graaf, Gary Barton

THE CITY OF RIPON,
A Municipal Corporation
By ________________________________
DEAN UECKER, Mayor
ATTEST:

By: ___________________________
LISA ROOS, City Clerk

2.A
Packet Pg. 233