C. Examine roughing-in for instruments installed in duct systems to verify actual locations of connections before installation.

D. Prepare written report, endorsed by Installer, listing conditions detrimental to performance.

E. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 TEMPERATURE INSTRUMENT APPLICATIONS
A. Air Temperature Sensors:

1. Duct, Thermistor

2. Space, Thermistor
304
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
TEMPERATURE INSTRUMENTS 230923.27 - 4

3.3 INSTALLATION, GENERAL
A. Install products level, plumb, parallel, and perpendicular with building construction.

B. Properly support instruments, tubing, piping, wiring, and conduit to comply with requirements indicated. Brace all products to prevent lateral movement and sway or a break in attachment when subjected to a force.

C. Fastening Hardware:

1. Stillson wrenches, pliers, and other tools that cause injury to or mar surfaces of rods, nuts, and other parts are prohibited for work of assembling and tightening nuts.

2. Tighten bolts and nuts firmly and uniformly. Do not overstress threads by excessive force or by oversized wrenches.

3. Lubricate threads of bolts, nuts, and screws with graphite and oil before assembly.

D. Install products in locations that are accessible and that permit calibration and maintenance from floor, equipment platforms, or catwalks. Where ladders are required for Owner's access, confirm unrestricted ladder placement is possible under occupied condition.

E. Corrosive Environments:

1. Use products that are suitable for environment to which they are subjected.

2. If possible, avoid or limit use of materials in corrosive environments.

3. When conduit is in contact with a corrosive environment, use Type 316 stainless steel conduit and fittings or conduit and fittings that are coated with a corrosive-resistant coating that is suitable for environment.

4. Where instruments are located in a corrosive environment and are not corrosive resistant from manufacturer, field install products in a NEMA 250, Type 4X enclosure constructed of Type 316L stainless steel.

3.4 ELECTRICAL CONNECTIONS
A. Furnish and install electrical power to products requiring electrical connections.

B. Furnish and install power wiring. Comply with requirements in Section 260519 "Low-Voltage Electrical Power Conductors and Cables."

3.5 INSTALLATION OF TEMPERATURE INSTRUMENTS
A. Mounting Location:

1. Roughing In:
a. Outline instrument mounting locations before setting instruments and routing cable, wiring, tubing, and conduit to final location.
b. Provide independent inspection to confirm that proposed mounting locations comply with requirements indicated and approved submittals. 305
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
TEMPERATURE INSTRUMENTS 230923.27 - 5
1) Indicate dimensioned locations with mounting height for all surfacemounted products on Shop Drawings. 2) Do not begin installation without submittal approval of mounting location. c. Complete installation rough-in only after confirmation by independent inspection is complete and approval of location is documented for review by Owner and Architect on request.

2. Install switches and transmitters for air and liquid temperature associated with individual air-handling units and associated connected ductwork and piping near air-handling units co-located in air-handling unit system control panel to provide service personnel a single and convenient location for inspection and service.

3. Install liquid and steam temperature switches and transmitters for indoor applications in mechanical equipment rooms. Do not locate in user-occupied space unless indicated specifically on Drawings.

4. Install air temperature switches and transmitters for indoor applications in mechanical equipment rooms. Do not locate in user-occupied space unless indicated specifically on Drawings.

5. Mount switches and transmitters on walls, floor-supported freestanding pipe stands, or floor-supported structural support frames. Use manufacturer's mounting brackets to accommodate field mounting. Securely support and brace products to prevent vibration and movement.

B. Mounting Height:

1. Mount temperature instruments in user-occupied space to match mounting height of light switches unless otherwise indicated on Drawings. Mounting height shall comply with codes and accessibility requirements.

2. Mount switches and transmitters located in mechanical equipment rooms and other similar space not subject to code or state and Federal accessibility requirements within a range of 42 to 72 inches (1.1 to 1.6 m) above the adjacent floor, grade, or service catwalk or platform.
a. Make every effort to mount at 60 inches (1500 mm).

C. Seal penetrations to ductwork, plenums, and air-moving equipment to comply with duct staticpressure class and leakage and seal classes indicated using neoprene gaskets or grommets.

D. Installation of Space Temperature Sensor:

1. Conceal assembly in an electrical box of sufficient size to house sensor and transmitter, if provided.

2. Install electrical box with a faceplate to match sensor cover if sensor cover does not completely cover electrical box.

3. In finished areas, recess electrical box within wall.

4. In unfinished areas, electrical box may be surface mounted if electrical light switches are surface mounted. Use a cast-aluminum electric box for surface-mounted installations.

5. Align electrical box with other electrical devices such as visual alarms and light switches located in the vicinity to provide a neat and well-thought-out arrangement. Where possible, align in both horizontal and vertical axis.
306
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
TEMPERATURE INSTRUMENTS 230923.27 - 6
E. Installation of Single-Point Duct Temperature Sensor:

1. Install single-point-type, duct-mounted, supply- and return-air temperature sensors.

Install sensors in ducts with sensitive portion of the element installed in center of duct cross section and located to sense near average temperature. Do not exceed 24 inches (610 mm) in sensor length.

2. Install return-air sensor in location that senses return-air temperature without influence from outdoor or mixed air.

3. Rigidly support sensor to duct and seal penetration airtight.

4. If required to have transmitter, mount transmitter remote from sensor at accessible and serviceable location.

F. Installation of Averaging Duct Temperature Sensor:

1. Install averaging-type air temperature sensor for temperature sensors located within airhandling units, similar equipment, and large ducts with air tunnel cross-sectional area of 20 sq. ft. (1.86 sq. m) and larger.

2. Install sensor length to maintain coverage over entire cross-sectional area. Install multiple sensors where required to maintain the minimum coverage.

3. Fasten and support sensor with manufacturer-furnished clips to keep sensor taut throughout entire length.

4. If required to have transmitter, mount transmitter in an accessible and serviceable location.

3.6 IDENTIFICATION
A. Identify system components, wiring, cabling, and terminals. Each piece of wire, cable, and tubing shall have the same designation at each end for operators to determine continuity at points of connection. Comply with requirements for identification specified in Section 260553 "Identification for Electrical Systems."

3.7 CLEANING
A. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other foreign materials from exposed interior and exterior surfaces.

B. Wash and shine glazing.

C. Polish glossy surfaces to a clean shine.

3.8 CHECK-OUT PROCEDURES
A. Check installed products before continuity tests, leak tests, and calibration.

B. Check temperature instruments for proper location and accessibility.

C. Verify sensing element type and proper material.
307
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
TEMPERATURE INSTRUMENTS 230923.27 - 7
D. Verify location and length.

E. Verify that wiring is correct and secure.

3.9 ADJUSTMENT, CALIBRATION, AND TESTING
A. Description:

1. Calibrate each instrument installed that is not factory calibrated and provided with calibration documentation.

2. Provide a written description of proposed field procedures and equipment for calibrating each type of instrument. Submit procedures before calibration and adjustment.

3. For each analog instrument, make a three-point test of calibration for both linearity and accuracy.

4. Equipment and procedures used for calibration shall meet instrument manufacturer's written instructions.

5. Provide diagnostic and test equipment for calibration and adjustment.

6. Field instruments and equipment used to test and calibrate installed instruments shall have accuracy at least twice the instrument accuracy being calibrated. For example, an installed instrument with an accuracy of 1 percent shall be checked by an instrument with an accuracy of 0.5 percent.

7. Calibrate each instrument according to instrument instruction manual supplied by manufacturer.

8. If after calibration indicated performance cannot be achieved, replace out-of-tolerance instruments.

9. Comply with field-testing requirements and procedures indicated by ASHRAE Guideline 11, "Field Testing of HVAC Control Components," in the absence of specific requirements and to supplement requirements indicated.

B. Analog Signals:

1. Check analog voltage signals using a precision voltage meter at zero, 50, and 100 percent.

2. Check analog current signals using a precision current meter at zero, 50, and 100 percent.

3. Check resistance signals for temperature sensors at zero, 50, and 100 percent of operating span using a precision-resistance source.

C. Digital Signals:

1. Check digital signals using a jumper wire.

2. Check digital signals using an ohmmeter to test for contact.

D. Sensors: Check sensors at zero, 50, and 100 percent of Project design values.

E. Switches: Calibrate switches to make or break contact at set points indicated.

F. Transmitters:

1. Check and calibrate transmitters at zero, 50, and 100 percent of Project design values. 308
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
TEMPERATURE INSTRUMENTS 230923.27 - 8

2. Calibrate resistance temperature transmitters at zero, 50, and 100 percent of span using a precision-resistance source.

3.10 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and installations, including connections.

C. Prepare test and inspection reports.

3.11 ADJUSTING
A. Occupancy Adjustments: When requested within 12 months from date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions.

Provide up to two visits to Project during other-than-normal occupancy hours for this purpose.

3.12 MAINTENANCE SERVICE
A. Maintenance Service: Beginning at Substantial Completion, maintenance service shall include 12 months' full maintenance by manufacturer's authorized service representative. Include annual preventive maintenance, repair or replacement of worn or defective components, cleaning and adjusting as required for proper operation. Parts and supplies shall be manufacturer's authorized replacement parts and supplies.

3.13 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain temperature instruments.

B. Provide a complete set of instructional videos covering each product specified and installed and showing the following:

1. Software programming.

2. Calibration and test procedures.

3. Operation and maintenance requirements and procedures.

4. Troubleshooting procedures.

C. Coordinate video with operation and maintenance manuals and classroom instruction for use by Owner in operating, maintaining, and troubleshooting.

END OF SECTION 230923.27
309
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 1
SECTION 231123 - FACILITY NATURAL-GAS PIPING

1.1 SUMMARY
A. Section Includes:

1. Pipes, tubes, and fittings.

2. Piping specialties.

3. Joining materials.

4. Manual gas shutoff valves.

5. Pressure regulators.

6. Dielectric fittings.

1.2 DEFINITIONS
A. CWP: Cold working pressure.

B. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. An example includes rooftop locations.

C. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

D. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

1.3 ACTION SUBMITTALS
A. Product Data:

1. Piping specialties.

2. Corrugated, stainless steel tubing with associated components.

3. Valves. Include pressure rating, capacity, settings, and electrical connection data of selected models.

4. Pressure regulators. Indicate pressure ratings and capacities.

5. Service meters. Indicate pressure ratings and capacities. Include bypass fittings and meter bars.

6. Dielectric fittings.

B. Shop Drawings: For facility natural-gas piping layout. Include plans, piping layout and elevations, sections, and details for fabrication of pipe anchors, hangers, supports for multiple pipes, alignment guides, expansion joints and loops, and attachments of the same to building structure. Detail location of anchors, alignment guides, and expansion joints and loops. 310
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 2

1.4 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Plans and details, drawn to scale, on which natural-gas piping is shown and coordinated with other installations, using input from installers of the items involved.

B. Field quality-control reports.

1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For pressure regulators and service meters to include in emergency, operation, and maintenance manuals.

1.6 QUALITY ASSURANCE
A. Steel Support Welding Qualifications: Qualify procedures and personnel in accordance with AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications: Qualify procedures and operators in accordance with the ASME Boiler and Pressure Vessel Code.

1.7 DELIVERY, STORAGE, AND HANDLING
A. Handling Flammable Liquids: Remove and dispose of liquids from existing natural-gas piping in accordance with requirements of authorities having jurisdiction.

B. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

C. Store and handle pipes and tubes having factory-applied protective coatings to avoid damaging coating, and protect from direct sunlight.

D. Protect stored PE pipes and valves from direct sunlight.

1.8 PROJECT CONDITIONS
A. Perform site survey, research public utility records, and verify existing utility locations. Contact utility-locating service for area where Project is located.

B. Interruption of Existing Natural-Gas Service: Do not interrupt natural-gas service to facilities occupied by Owner or others unless permitted under the following conditions, and then only after arranging to provide purging and startup of natural-gas supply in accordance with requirements indicated:

1. Notify Owner no fewer than two days in advance of proposed interruption of natural-gas service.

2. Do not proceed with interruption of natural-gas service without Owner's written permission.
311
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 3

1.9 COORDINATION
A. Coordinate sizes and locations of concrete bases with actual equipment provided.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS
A. Obtain each product type from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS
A. Comply with the International Fuel Gas Code.

B. Minimum Operating-Pressure Ratings:

1. Piping and Valves: 100 psig (690 kPa) minimum unless otherwise indicated.

2. Service Regulators: 65 psig (450 kPa) minimum unless otherwise indicated.

3. Minimum Operating Pressure of Service Meter: 5 psig (34.5 kPa) .

C. Natural-Gas System Pressure within Buildings:

1. Single Pressure: More than 0.5 psig (3.45 kPa), but not more than 2 psig (13.8 kPa).

D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

1. The term "withstand" means "the piping system will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the piping system will be fully operational after the seismic event."

2. Component Importance Factor: 1.5.

2.3 PIPES, TUBES, AND FITTINGS
A. Steel Pipe: ASTM A53/A53M, black steel, Schedule 40, Type E or S, Grade B.

1. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150, standard pattern.

2. Wrought-Steel Welding Fittings: ASTM A234/A234M for butt welding and socket welding.

3. Unions: ASME B16.39, Class 150, malleable iron with brass-to-iron seat, ground joint, and threaded ends.

4. Forged-Steel Flanges and Flanged Fittings: ASME B16.5, minimum Class 150, including bolts, nuts, and gaskets of the following material group, end connections, and facings:
a. Material Group: 1.1.
b. End Connections: Threaded or butt welding to match pipe. c. Lapped Face: Not permitted underground.
312
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 4
d. Gasket Materials: ASME B16.20, metallic, flat, asbestos free, aluminum O-rings, and spiral-wound metal gaskets.
e. Bolts and Nuts: ASME B18.2.1, carbon steel aboveground and stainless-steel underground.

5. Mechanical Couplings:
a. Stainless steel flanges and tube with epoxy finish.
b. NBR seals.
c. Stainless steel bolts, washers, and nuts.
d. Coupling is to be capable of joining PE pipe to PE pipe, steel pipe to PE pipe, or steel pipe to steel pipe.
e. Steel body couplings installed underground on plastic pipe are to be factory equipped with anode.

B. Corrugated, Stainless Steel Tubing: Comply with ANSI/IAS LC 1/CSA 6.26.

1. Tubing: ASTM A240/A240M, corrugated, Series 300 stainless steel.

2. Coating: PE with flame retardant.
a. Surface-Burning Characteristics: As determined by testing identical products in accordance with ASTM E84 by qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1) Flame-Spread Index: 25 or less.
2) Smoke-Developed Index: 50or less.

3. Fittings: Copper-alloy mechanical fittings with ends made to fit and listed for use with corrugated stainless-steel tubing and capable of metal-to-metal seal without gaskets.

Include brazing socket or threaded ends complying with ASME B1.20.1.

4. Striker Plates: Steel, designed to protect tubing from penetrations.

5. Manifolds: Malleable iron or steel with factory-applied protective coating. Threaded connections are to comply with ASME B1.20.1 for pipe inlet and corrugated tubing outlets.

6. Operating-Pressure Rating: 5 psig (34.5 kPa).

7. Flare Fittings: Comply with ASME B16.26 and SAE J513. a. Copper fittings with long nuts.
b. Metal-to-metal compression seal without gasket.
c. Dryseal threads complying with ASME B1.20.3.

2.4 PIPING SPECIALTIES
A. Appliance Flexible Connectors:

1. Indoor, Fixed-Appliance Flexible Connectors: Comply with ANSI Z21.24.

2. Indoor, Movable-Appliance Flexible Connectors: Comply with ANSI Z21.69.

3. Outdoor, Appliance Flexible Connectors: Comply with ANSI Z21.75.

4. Corrugated, stainless steel tubing with polymer coating.

5. Operating-Pressure Rating: 0.5 psig (3.45 kPa).

6. End Fittings: Zinc-coated steel.

7. Threaded Ends: Comply with ASME B1.20.1.
313
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 5

8. Maximum Length: 72 inches (1830 mm).

B. Quick-Disconnect Devices: Comply with ANSI Z21.41.

1. Copper-alloy convenience outlet and matching plug connector.

2. Seals: Nitrile.

3. Hand operated with automatic shutoff when disconnected.

4. For indoor or outdoor applications.

5. Adjustable, retractable restraining cable.

C. Y-Pattern Strainers:

1. Body: ASTM A126, Class B, cast iron with bolted cover and bottom drain connection.

2. End Connections: Threaded ends for NPS 2 (DN 50) and smaller; flanged ends for NPS 2-1/2 (DN 65) and larger.

3. Strainer Screen: 40-mesh startup strainer, and perforated stainless steel basket with 50 percent free area.

4. CWP Rating: 125 psig (862 kPa).

2.5 JOINING MATERIALS
A. Joint Compound and Tape: Suitable for natural gas.

B. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

2.6 MANUAL GAS SHUTOFF VALVES
A. General Requirements for Metallic Valves, NPS 2 (DN 50) and Smaller: Comply with ASME B16.33.

1. CWP Rating: 125 psig (862 kPa).

2. Threaded Ends: Comply with ASME B1.20.1.

3. Dryseal Threads on Flare Ends: Comply with ASME B1.20.3.

4. Tamperproof Feature: Locking feature for valves indicated in "Underground, Manual Gas Shutoff Valve Schedule" and "Aboveground, Manual Gas Shutoff Valve Schedule" articles.

5. Listed and labeled by an NRTL acceptable to authorities having jurisdiction for valves 1 inch (25 mm) and smaller.

6. Service Mark: Valves NPS 1-1/4 to NPS 2 (DN 32 to DN 50) having initials "WOG" permanently marked on valve body.

B. General Requirements for Metallic Valves, NPS 2-1/2 (DN 65) and Larger: Comply with ASME B16.38.

1. CWP Rating: 125 psig (862 kPa).

2. Flanged Ends: Comply with ASME B16.5 for steel flanges. 314
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 6

3. Tamperproof Feature: Locking feature for valves indicated in "Underground, Manual Gas Shutoff Valve Schedule" and "Aboveground, Manual Gas Shutoff Valve Schedule" articles.

4. Service Mark: Initials "WOG" permanently marked on valve body.

C. One-Piece, Bronze Ball Valve with Bronze Trim: MSS SP-110.

1. Body: Bronze, complying with ASTM B584.

2. Ball: Chrome-plated brass.

3. Stem: Bronze; blowout proof.

4. Seats: Reinforced TFE; blowout proof.

5. Packing: Separate packnut with adjustable-stem packing threaded ends.

6. Ends: Threaded, flared, or socket as indicated in "Underground, Manual Gas Shutoff Valve Schedule" and "Aboveground, Manual Gas Shutoff Valve Schedule" articles.

7. CWP Rating: 600 psig (4140 kPa).

8. Listing: Valves NPS 1 (DN 25) and smaller are to be listed and labeled by an NRTL acceptable to authorities having jurisdiction.

9. Service: Suitable for natural-gas service with "WOG" indicated on valve body.

D. Two-Piece, Full-Port, Bronze Ball Valves with Bronze Trim: MSS SP-110.

1. Body: Bronze, complying with ASTM B584.

2. Ball: Chrome-plated bronze.

3. Stem: Bronze; blowout proof.

4. Seats: Reinforced TFE; blowout proof.

5. Packing: Threaded-body packnut design with adjustable-stem packing.

6. Ends: Threaded, flared, or socket as indicated in "Underground, Manual Gas Shutoff Valve Schedule" and "Aboveground, Manual Gas Shutoff Valve Schedule" articles.

7. CWP Rating: 600 psig (4140 kPa).

8. Listing: Valves NPS 1 (DN 25) and smaller are to be listed and labeled by an NRTL acceptable to authorities having jurisdiction.

9. Service: Suitable for natural-gas service with "WOG" indicated on valve body.

E. Two-Piece, Regular-Port Bronze Ball Valves with Bronze Trim: MSS SP-110.

1. Body: Bronze, complying with ASTM B584.

2. Ball: Chrome-plated bronze.

3. Stem: Bronze; blowout proof.

4. Seats: Reinforced TFE.

5. Packing: Threaded-body packnut design with adjustable-stem packing.

6. Ends: Threaded, flared, or socket as indicated in "Underground, Manual Gas Shutoff Valve Schedule" and "Aboveground, Manual Gas Shutoff Valve Schedule" articles.

7. CWP Rating: 600 psig (4140 kPa).

8. Listing: Valves NPS 1 (DN 25) and smaller are to be listed and labeled by an NRTL acceptable to authorities having jurisdiction.

9. Service: Suitable for natural-gas service with "WOG" indicated on valve body.

2.7 PRESSURE REGULATORS
A. General Requirements:

1. Single stage and suitable for natural gas.

2. Steel jacket and corrosion-resistant components.
315
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 7

3. Elevation compensator.

4. End Connections: Threaded for regulators NPS 2 (DN 50) and smaller; flanged for regulators NPS 2-1/2 (DN 65) and larger.

B. Service Pressure Regulators: Comply with ANSI Z21.80A.

1. Body and Diaphragm Case: Cast iron or die-cast aluminum.

2. Springs: Zinc-plated steel; interchangeable.

3. Diaphragm Plate: Zinc-plated steel.

4. Seat Disc: NBR; resistant to gas impurities, abrasion, and deformation at the valve port.

5. Orifice: Aluminum; interchangeable.

6. Seal Plug: UV-stabilized, mineral-filled nylon.

7. Single-port, self-contained regulator with orifice no larger than required at maximum pressure inlet, and no pressure sensing piping external to regulator.

8. Pressure regulator is to maintain discharge pressure setting downstream and is to not exceed 150 percent of design discharge pressure at shutoff.

9. Overpressure Protection Device: Factory mounted on pressure regulator.

10. Atmospheric Vent: Factory- or field-installed, stainless steel screen in opening if not connected to vent piping.

11. Maximum Inlet Pressure: 100 psig (690 kPa).

C. Line Pressure Regulators: Comply with ANSI Z21.80A.

1. Body and Diaphragm Case: Cast iron or die-cast aluminum.

2. Springs: Zinc-plated steel; interchangeable.

3. Diaphragm Plate: Zinc-plated steel.

4. Seat Disc: NBR; resistant to gas impurities, abrasion, and deformation at the valve port.

5. Orifice: Aluminum; interchangeable.

6. Seal Plug: UV-stabilized, mineral-filled nylon.

7. Single-port, self-contained regulator with orifice no larger than required at maximum pressure inlet, and no pressure sensing piping external to regulator.

8. Pressure regulator is to maintain discharge pressure setting downstream and is to not exceed 150 percent of design discharge pressure at shutoff.

9. Overpressure Protection Device: Factory mounted on pressure regulator.

10. Atmospheric Vent: Factory- or field-installed, stainless steel screen in opening if not connected to vent piping.

11. Maximum Inlet Pressure: 5 psig (34.5 kPa).

D. Appliance Pressure Regulators: Comply with ANSI Z21.18.

1. Body and Diaphragm Case: Die-cast aluminum.

2. Springs: Zinc-plated steel; interchangeable.

3. Diaphragm Plate: Zinc-plated steel.

4. Seat Disc: NBR.

5. Seal Plug: UV-stabilized, mineral-filled nylon.

6. Factory-Applied Finish: Minimum three-layer polyester and polyurethane paint finish.

7. Regulator may include vent limiting device, instead of vent connection, if approved by authorities having jurisdiction.

8. Maximum Inlet Pressure: 5 psig (34.5 kPa).
316
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 8

2.8 DIELECTRIC FITTINGS
A. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined.

B. Dielectric Unions:

1. Description:
a. Standard: ASSE 1079.
b. Pressure Rating: 125 psig (860 kPa) minimum at 180 deg F (82 deg C). c. End Connections: Solder-joint copper alloy and threaded ferrous.

2.9 LABELING AND IDENTIFYING
A. Detectable Warning Tape: Acid- and alkali-resistant, PE film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description and rated pressure of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches (750 mm) deep; colored yellow.

B. Label and identify gas piping and pressure outside a multitenant building by tenant.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine roughing-in for natural-gas piping system to verify actual locations of piping connections before equipment installation.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Close equipment shutoff valves before turning off natural gas to premises or piping section.

B. Inspect natural-gas piping in accordance with the International Fuel Gas Code to determine that natural-gas utilization devices are turned off in piping section affected.

C. Comply with the International Fuel Gas Code requirements for preventing accidental ignition.

3.3 INSTALLATION OF INDOOR PIPING
A. Comply with the International Fuel Gas Code for installation and purging of natural-gas piping.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements are used to size pipe and calculate friction loss, 317
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 9
expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

C. Arrange for pipe spaces, chases, slots, sleeves, and openings in building structure during progress of construction, to allow for mechanical installations.

D. Do not install piping in concealed locations unless sleeved with the sleeve open at both ends.

E. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

F. Where installing piping above accessible ceilings, allow sufficient space for ceiling panel removal.

G. Locate valves for easy access. Do not locate valves within return air plenums.

H. Install natural-gas piping at uniform grade of 2 percent down toward drip and sediment traps.

I. Install piping free of sags and bends.

J. Install fittings for changes in direction and branch connections.

K. Verify final equipment locations for roughing-in.

L. Comply with requirements in Sections specifying gas-fired appliances and equipment for roughing-in requirements.

M. Drips and Sediment Traps: Install drips at points where condensate may collect, including service-meter outlets. Locate where accessible to permit cleaning and emptying. Do not install where condensate is subject to freezing.

1. Construct drips and sediment traps using tee fitting with bottom outlet plugged or capped.

Use nipple a minimum length of 3 pipe diameters, but not less than 3 inches (75 mm) long and same size as connected pipe. Install with space below bottom of drip to remove plug or cap.

2. Install sediment trap on both sides of regulators for gas reduction to 2 psig (13.8 kPa) with valve and cap.

N. Extend relief vent connections for service regulators, line regulators, and overpressure protection devices to outdoors and terminate with weatherproof vent cap.

O. Conceal pipe installations in walls, pipe spaces, utility spaces, above ceilings, below grade or floors, and in floor channels unless indicated to be exposed to view.

P. Concealed Location Installations: Except as specified below, install concealed natural-gas piping and piping installed under the building in containment conduit constructed of steel pipe with welded joints as described in Part 2. Install a vent pipe from containment conduit to outdoors and terminate with weatherproof vent cap.
318
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 10

1. Above Accessible Ceilings: Natural-gas piping, fittings, valves, and regulators may be installed in accessible spaces without containment conduit.

2. In Floors: Install natural-gas piping with welded or brazed joints and protective coating in cast-in-place concrete floors. Cover piping to be cast in concrete slabs with minimum of 1-1/2 inches (38 mm) of concrete. Piping may not be in physical contact with other metallic structures such as reinforcing rods or electrically neutral conductors. Do not embed piping in concrete slabs containing quick-set additives or cinder aggregate.

3. Prohibited Locations:
a. Do not install natural-gas piping in or through circulating air ducts, clothes or trash chutes, chimneys or gas vents (flues), ventilating ducts, or dumbwaiter or elevator shafts.
b. Do not install natural-gas piping in solid walls or partitions.

Q. Use eccentric reducer fittings to make reductions in pipe sizes. Install fittings with level side down.

R. Connect branch piping from top or side of horizontal piping.

S. Install unions in pipes NPS 2 (DN 50) and smaller, adjacent to each valve, at final connection to each piece of equipment. Unions are not required at flanged connections.

T. Do not use natural-gas piping as grounding electrode.

U. Install strainer on inlet of each line-pressure regulator and automatic or electrically operated valve.

3.4 INSTALLATION OF VALVES
A. Install manual gas shutoff valve for each gas appliance ahead of corrugated stainless steel tubing, aluminum, or copper connector.

B. Install regulators and overpressure protection devices with maintenance access space adequate for servicing and testing.

C. Do not install valves in return-air plenums.

3.5 PIPING JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Threaded Joints:

1. Thread pipe with tapered pipe threads complying with ASME B1.20.1.

2. Cut threads full and clean using sharp dies.
319
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 11

3. Ream threaded pipe ends to remove burrs and restore full inside diameter of pipe.

4. Apply appropriate tape or thread compound to external pipe threads unless dryseal threading is specified.

5. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

D. Welded Joints:

1. Construct joints in accordance with AWS D10.12/D10.12M, using qualified processes and welding operators.

2. Bevel plain ends of steel pipe.

3. Patch factory-applied protective coating as recommended by manufacturer at field welds and where damage to coating occurs during construction.

E. Flanged Joints: Install gasket material, size, type, and thickness appropriate for natural-gas service. Install gasket concentrically positioned.

3.6 INSTALLATION OF HANGERS AND SUPPORTS
A. Comply with requirements for seismic-restraint devices specified in Section 230548 "Vibration and Seismic Controls for HVAC."
B. Comply with requirements in Section 230529 "Hangers and Supports for HVAC Piping and Equipment" for hangers, supports, and anchor devices.

C. Install hangers for steel piping with maximum horizontal spacing and minimum rod diameters, to comply with MSS SP-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

D. Install hangers for corrugated stainless steel tubing, with maximum horizontal spacing and minimum rod diameters, to comply with manufacturer's written instructions, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

E. Support horizontal piping within 12 inches (300 mm) of each fitting.

F. Support vertical runs of steel piping to comply with MSS SP-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

G. Support vertical runs of corrugated stainless steel tubing to comply with manufacturer's written instructions, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

3.7 PIPING CONNECTIONS
A. Connect to utility's gas main according to utility's procedures and requirements.

B. Install natural-gas piping electrically continuous, and bonded to gas-appliance equipment grounding conductor of the circuit powering the appliance in accordance with NFPA 70. 320
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
FACILITY NATURAL-GAS PIPING 231123 - 12
C. Where installing piping adjacent to appliances, allow space for service and maintenance of appliances.

D. Connect piping to appliances using manual gas shutoff valves and unions. Install valve within 72 inches (1800 mm) of each gas-fired appliance and equipment. Install union between valve and appliances or equipment.

3.8 LABELING AND IDENTIFICATION
A. Install detectable warning tape directly above gas piping, 12 inches (300 mm) below finished grade, except 6 inches (150 mm) below subgrade under pavements and slabs.

3.9 CONCRETE BASES
A. Concrete Bases: Anchor equipment to concrete base in accordance with seismic codes at Project. See Section 230548 "Vibration and Seismic Controls for HVAC."

1. Construct concrete bases of dimensions indicated, but not less than 4 inches (100 mm) larger in both directions than supported unit.

2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of the base.

3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.

4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

5. Install anchor bolts to elevations required for proper attachment to supported equipment.

6. Use 3000 psig (20.7 MPa), 28-day, compressive-strength concrete and reinforcement as specified in Section 033000 "Cast-in-Place Concrete."

3.10 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. Test, inspect, and purge natural gas in accordance with the International Fuel Gas Code and authorities having jurisdiction.

2. Natural-gas piping will be considered defective if it does not pass tests and inspections.

B. Prepare test and inspection reports.

END OF SECTION 231123
321
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 1
SECTION 232300 - REFRIGERANT PIPING
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Copper tube and fittings.

2. Valves and specialties.

3. Refrigerants.

1.2 ACTION SUBMITTALS
A. Product Data: For the following:

1. Solenoid valves.

2. Thermostatic expansion valves.

3. Hot-gas bypass valves.

4. Strainers.

5. Filter dryers.

6. Pressure-regulating valves.

B. Product Data Submittals: For each product.

1. Submit data for each type of refrigerant piping, fitting, valve, piping specialty, and refrigerant.

C. Delegated Design Submittals: For refrigerant piping size and layout, including oil traps, double risers, specialties, and pipe and tube sizes to accommodate, as a minimum, equipment provided, elevation difference between compressor and evaporator, and length of piping to ensure proper operation and compliance with warranties of connected equipment.

D. Shop Drawings:

1. Show piping size and piping layout, including oil traps, double risers, specialties, and pipe and tube sizes to accommodate, as a minimum, equipment provided, elevation difference between compressor and evaporator, and length of piping to ensure proper operation and compliance with warranties of connected equipment.

2. Show interface and spatial relationships between piping and equipment.

1.3 INFORMATIONAL SUBMITTALS
A. Field Quality-Control Reports: For each field quality control test and inspection. 322
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 2

1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For refrigerant valves and piping specialties to include in maintenance manuals.

1.5 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding, Brazing, and Fusing Qualifications."

1.6 DELIVERY, STORAGE, AND HANDLING
A. Store piping with end caps in place to ensure that piping interior and exterior are clean when installed.

B. Prepare valves and specialties for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads and other end connections.

C. Use the following precautions during storage:

1. Maintain valve and specialty end protection.

2. Store valves and specialties indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Test Pressure for Refrigerant R-410A:

1. Suction Tubing for Refrigeration and Air-Conditioning Applications Other than Heat Pumps: 300 psig (2068 kPa).

2. Suction Tubing for Heat-Pump Applications: 535 psig (3689 kPa).

3. Hot-Gas and Tubing Lines: 535 psig (3689 kPa).

2.2 COPPER TUBE AND FITTINGS
A. Copper Tube: ASTM B88, Type K or L (ASTM B88M, Type A or B).

B. Wrought-Copper Fittings, Solder Joint: ASME B16.22.

C. Wrought-Copper Fittings, Brazed Joint: ASME B16.50.

D. Wrought-Copper Unions: ASME B16.22.
323
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 3
E. Solder Filler Metals: ASTM B32. Use 95-5 tin antimony or alloy HB solder to join copper socket fittings on copper pipe.

F. Brazing Filler Metals: AWS A5.8M/A5.8.

G. Flexible Connectors:

1. Body: Tin-bronze bellows with woven, flexible, tinned-bronze-wire-reinforced protective jacket.

2. End Connections: Socket ends.

3. Offset Performance: Capable of minimum 3/4-inch (20-mm) misalignment in minimum 7-inch- (180-mm-) long assembly.

4. Working Pressure Rating: Factory test at minimum 500 psig (3450 kPa).

5. Maximum Operating Temperature: 250 deg F (121 deg C).

H. Copper-Tube, Pressure-Seal-Joint Fittings for Refrigerant Piping:

1. Standard: UL 207; certified by UL for field installation. Certification as a UL-recognized component alone is unacceptable.

2. Housing: Copper.

3. O-Rings: HNBR compatible with specific refrigerant.

4. Tools: Manufacturer's approved special tools.

5. Minimum Rated Pressure: 700 psig (48 bar).

2.3 VALVES AND SPECIALTIES
A. Diaphragm Packless Valves:

1. Body and Bonnet: Forged brass or cast bronze; globe design with straight-through or angle pattern.

2. Diaphragm: Phosphor bronze and stainless steel with stainless steel spring.

3. Operator: Rising stem and hand wheel.

4. Seat: Nylon.

5. End Connections: Socket, union, or flanged.

6. Working Pressure Rating: 500 psig (3450 kPa).

7. Maximum Operating Temperature: 240 deg F (116 deg C).

B. Check Valves:

1. Body: Ductile iron, forged brass, or cast bronze; globe pattern.

2. Bonnet: Bolted ductile iron, forged brass, or cast bronze; or brass hex plug.

3. Piston: Removable polytetrafluoroethylene seat.

4. Closing Spring: Stainless steel.

5. Manual Opening Stem: Seal cap, plated-steel stem, and graphite seal.

6. End Connections: Socket, union, threaded, or flanged.

7. Maximum Opening Pressure: 0.50 psig (3.4 kPa).

8. Working Pressure Rating: 500 psig (3450 kPa).

9. Maximum Operating Temperature: 275 deg F (135 deg C).

C. Service Valves:

1. Body: Forged brass with brass cap, including key end to remove core.

2. Core: Removable ball-type check valve with stainless steel spring.

3. Seat: Polytetrafluoroethylene.
324
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 4

4. End Connections: Copper spring.

5. Working Pressure Rating: 500 psig (3450 kPa).

6. Maximum Operating Temperature: 275 deg F (135 deg C).

D. Refrigerant Locking Caps:

1. Description: Locking-type, tamper-resistant, threaded caps to protect refrigerant-charging ports from unauthorized refrigerant access and leakage.

2. Material: Brass, with protective shroud or sleeve.

3. Refrigerant Identification: Color-coded, refrigerant specific based on AHRI Guideline N or Universal design.

4. Special Tool: For installing and unlocking.

E. Solenoid Valves: Comply with AHRI 760 I-P (AHRI 761 SI) and UL 429; listed and labeled by an NRTL.

1. Body and Bonnet: Plated steel.

2. Solenoid Tube, Plunger, Closing Spring, and Seat Orifice: Stainless steel.

3. Seat: Polytetrafluoroethylene.

4. End Connections: Threaded.

5. Electrical: Molded, watertight coil in NEMA 250 enclosure of type required by location with 1/2-inch (16-mm) conduit adapter, and 115 V ac coil.

6. Working Pressure Rating: 400 psig (2760 kPa).

7. Maximum Operating Temperature: 240 deg F (116 deg C).

F. Safety Relief Valves: Comply with ASME Boiler and Pressure Vessel Code; listed and labeled by an NRTL.

1. Body and Bonnet: Ductile iron and steel, with neoprene O-ring seal.

2. Piston, Closing Spring, and Seat Insert: Stainless steel.

3. Seat: Polytetrafluoroethylene.

4. End Connections: Threaded.

5. Working Pressure Rating: 400 psig (2760 kPa).

6. Maximum Operating Temperature: 240 deg F (116 deg C).

G. Thermostatic Expansion Valves: Comply with AHRI 750 I-P (AHRI 751 SI).

1. Body, Bonnet, and Seal Cap: Forged brass or steel.

2. Diaphragm, Piston, Closing Spring, and Seat Insert: Stainless steel.

3. Packing and Gaskets: Non-asbestos.

4. Capillary and Bulb: Copper tubing filled with refrigerant charge.

5. Suction Temperature: 40 deg F (4.4 deg C).

6. Superheat: Adjustable.

7. Reverse-flow option (for heat-pump applications).

8. End Connections: Socket, flare, or threaded union.

H. Hot-Gas Bypass Valves: Comply with UL 429; listed and labeled by an NRTL.

1. Body, Bonnet, and Seal Cap: Ductile iron or steel.

2. Diaphragm, Piston, Closing Spring, and Seat Insert: Stainless steel.

3. Packing and Gaskets: Non-asbestos.

4. Solenoid Tube, Plunger, Closing Spring, and Seat Orifice: Stainless steel.

5. Seat: Polytetrafluoroethylene.

6. Electrical: Molded, watertight coil in NEMA 250 enclosure of type required by location with 1/2-inch (16-GRC) conduit adapter and 115 V ac coil.

7. End Connections: Socket.
325
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 5

8. Throttling Range: Maximum 5 psig (34 kPa).

9. Maximum Operating Temperature: 240 deg F (116 deg C).

I. Straight-Type Strainers:

1. Body: Welded steel with corrosion-resistant coating.

2. Screen: 100-mesh stainless steel.

3. End Connections: Socket or flare.

4. Maximum Operating Temperature: 275 deg F (135 deg C).

J. Angle-Type Strainers:

1. Body: Forged brass or cast bronze.

2. Drain Plug: Brass hex plug.

3. Screen: 100-mesh monel.

4. End Connections: Socket or flare.

5. Maximum Operating Temperature: 275 deg F (135 deg C).

K. Moisture/Liquid Indicators:

1. Body: Forged brass.

2. Window: Replaceable, clear, fused glass window with indicating element protected by filter screen.

3. Indicator: Color-coded to show moisture content in parts per million (ppm).

4. Minimum Moisture Indicator Sensitivity: Indicate moisture above 60 ppm.

5. End Connections: Socket or flare.

6. Maximum Operating Temperature: 240 deg F (116 deg C).

L. Replaceable-Core Filter Dryers: Comply with AHRI 730 I-P (AHRI 731 SI).

1. Body and Cover: Painted-steel shell with ductile-iron cover, stainless steel screws, and neoprene gaskets.

2. Filter Media: 10 micron, pleated with integral end rings; stainless steel support.

3. Desiccant Media: Activated charcoal.

4. Access Ports: NPS 1/4 (DN 8) connections at entering and leaving sides for pressure differential measurement.

5. Maximum Pressure Loss: 2 psig (14 kPa).

6. Working Pressure Rating: 500 psig (3450 kPa).

7. Maximum Operating Temperature: 240 deg F (116 deg C).

M. Permanent Filter Dryers: Comply with AHRI 730 I-P (AHRI 731 SI).

1. Body and Cover: Painted-steel shell.

2. Filter Media: 10 micron, pleated with integral end rings; stainless steel support.

3. Desiccant Media: Activated alumina.

2.4 REFRIGERANTS
A. R-410A, ASHRAE 34: Pentafluoroethane/Difluoromethane. 326
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 6
PART 3 - EXECUTION

3.1 PIPING APPLICATION SCHEDULES
A. Refrigerant: R-410A
B. Suction, Hot-Gas, and Liquid Tubing for Conventional Air-Conditioning (Cooling-Only) Applications, NPS 1-1/2 (DN 40) and Smaller: Copper, Type ACR, annealed-temper tubing and wrought-copper fittings with brazed or soldered joints.

C. Safety-Relief-Valve Discharge Tubing for Conventional Air-Conditioning (Cooling-Only) Applications, Copper: Type ACR, drawn-temper or annealed-temper tubing and wroughtcopper fittings with brazed or soldered joints.

3.2 VALVE AND SPECIALTY APPLICATIONS
A. Install diaphragm packless valves in suction and discharge lines of compressor.

B. Install service valves for gauge taps at inlet and outlet of hot-gas bypass valves and strainers if they are not an integral part of valves and strainers.

C. Install a check valve at the compressor discharge and a liquid accumulator at the compressor suction connection.

D. Except as otherwise indicated, install diaphragm packless valves on inlet and outlet side of filter dryers.

E. Install a full-size, three-valve bypass around filter dryers.

F. Install solenoid valves upstream from each expansion valve and hot-gas bypass valve. Install solenoid valves in horizontal lines with coil at top.

G. Install thermostatic expansion valves as close as possible to distributors on evaporators.

1. Install valve so diaphragm case is warmer than bulb.

2. Secure bulb to clean, straight, horizontal section of suction line using two bulb straps. Do not mount bulb in a trap or at bottom of the line.

3. If external equalizer lines are required, make connection where it will reflect suction-line pressure at bulb location.

H. Install safety-relief valves where required by ASME Boiler and Pressure Vessel Code. Pipe safety-relief-valve discharge line to outside in accordance with ASHRAE 15.

I. Install moisture/liquid indicators in liquid line at the inlet of the thermostatic expansion valve or at the inlet of the evaporator coil capillary tube.

J. Install strainers upstream from and adjacent to the following unless they are furnished as an integral assembly for the device being protected:

1. Solenoid valves.
327
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 7

2. Thermostatic expansion valves.

3. Hot-gas bypass valves.

4. Compressor.

K. Install filter dryers in liquid line between compressor and thermostatic expansion valve, and in the suction line at the compressor.

L. Install receivers sized to accommodate pump-down charge.

M. Install flexible connectors at compressors.

N. Provide refrigerant locking caps on refrigerant charging ports that are located outdoors unless otherwise protected from unauthorized access by a means acceptable to authority having jurisdiction.

3.3 INSTALLATION OF PIPING, GENERAL
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems; indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Shop Drawings.

B. Install refrigerant piping in accordance with ASHRAE 15.

C. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping adjacent to machines to allow service and maintenance.

G. Install piping free of sags and bends.

H. Install fittings for changes in direction and branch connections.

I. Select system components with pressure rating equal to or greater than system operating pressure.

J. Install piping as short and direct as possible, with a minimum number of joints, elbows, and fittings.

K. Install refrigerant piping in rigid or flexible conduit in locations where exposed to mechanical injury.

L. Slope refrigerant piping as follows:
328
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 8

1. Install horizontal hot-gas discharge piping with a uniform slope downward away from compressor.

2. Install horizontal suction lines with a uniform slope downward to compressor.

3. Install traps and double risers to entrain oil in vertical runs.

4. Liquid lines may be installed level.

M. When brazing or soldering, remove solenoid-valve coils and sight glasses; also remove valve stems, seats, packing, and accessible internal parts of refrigerant specialties. Do not apply heat near expansion-valve bulb.

N. Install piping with adequate clearance between pipe and adjacent walls and hangers or between pipes for insulation installation.

3.4 PIPE JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Fill pipe and fittings with an inert gas (nitrogen or carbon dioxide), during brazing or welding, to prevent scale formation.

D. Soldered Joints: Construct joints in accordance with ASTM B828 or CDA's "Copper Tube Handbook."
E. Brazed Joints: Construct joints in accordance with AWS BRH, "Brazing Handbook," Ch. 35, "Pipe and Tubing."

1. Use Type BCuP (copper-phosphorus) alloy for joining copper socket fittings with copper pipe.

2. Use Type BAg (cadmium-free silver) alloy for joining copper with bronze or steel.

3. Apply appropriate tape or thread compound to external pipe threads unless dry-seal threading is specified.

4. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

F. Welded Joints: Construct joints in accordance with AWS D10.12M/D10.12.

3.5 INSTALLATION OF HANGERS AND SUPPORTS
A. Comply with requirements for seismic restraints in Section 230548 "Vibration and Seismic Controls for HVAC."
B. Comply with Section 230529 "Hangers and Supports for HVAC Piping and Equipment" for hangers, supports, and anchor devices.

C. Install the following pipe attachments:
329
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 9

1. Adjustable steel clevis hangers for individual horizontal runs less than 20 ft. (6 m) long.

2. Roller hangers and spring hangers for individual horizontal runs 20 ft. (6 m) or longer.

3. Pipe Roller: MSS SP-58, Type 44 for multiple horizontal piping 20 ft. (6 m) or longer, supported on a trapeze.

4. Spring hangers to support vertical runs.

5. Copper-clad hangers and supports for hangers and supports in direct contact with copper pipe.

D. Install hangers for copper tubing, with maximum horizontal spacing and minimum rod diameters, to comply with MSS SP-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

E. Support horizontal piping within 12 inches (300 mm) of each fitting.

F. Support vertical runs of copper tubing to comply with MSS SP-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

3.6 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. Comply with ASME B31.5, Chapter VI.

2. Test refrigerant piping, specialties, and receivers. Isolate compressor, condenser, evaporator, and safety devices from test pressure if they are not rated above the test pressure.

3. Test high- and low-pressure side piping of each system separately at not less than the pressures indicated in "Performance Requirements" Article. a. Fill system with nitrogen to the required test pressure. b. System must maintain test pressure at the manifold gauge throughout duration of test.
c. Test joints and fittings with electronic leak detector or by brushing a small amount of soap and glycerin solution over joints.
d. Remake leaking joints using new materials, and retest until satisfactory results are achieved.

B. Prepare test and inspection reports.

3.7 SYSTEM CHARGING
A. Charge system using the following procedures:

1. Install core in filter dryers after leak test but before evacuation.

2. Evacuate entire refrigerant system with a vacuum pump to 500 micrometers (67 Pa). If vacuum holds for 12 hours, system is ready for charging.

3. Break vacuum with refrigerant gas, allowing pressure to build up to 2 psig (14 kPa).

4. Charge system with a new filter-dryer core in charging line. 330
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT PIPING 232300 - 10

3.8 ADJUSTING
A. Adjust thermostatic expansion valve to obtain proper evaporator superheat.

B. Adjust high- and low-pressure switch settings to avoid short cycling in response to fluctuating suction pressure.

C. Adjust set-point temperature of air-conditioning or chilled-water controllers to the system design temperature.

D. Perform the following adjustments before operating the refrigeration system, according to manufacturer's written instructions:

1. Open shutoff valves in condenser water circuit.

2. Verify that compressor oil level is correct.

3. Open compressor suction and discharge valves.

4. Open refrigerant valves but not bypass valves that are used for other purposes.

5. Check open compressor-motor alignment and verify lubrication for motors and bearings.

E. Replace core of replaceable filter dryer after system has been adjusted and after design flow rates and pressures are established.

END OF SECTION 232300
331
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 1
SECTION 233113 - METAL DUCTS
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Single-wall rectangular ducts and fittings.

2. Single-wall round ducts and fittings.

3. Sheet metal materials.

4. Sealants and gaskets.

5. Hangers and supports.

B. Related Requirements:

1. Section 230548 "Vibration and Seismic Controls for HVAC" for seismic restraint devices and installation.

2. Section 230593 "Testing, Adjusting, and Balancing for HVAC" for testing, adjusting, and balancing requirements for metal ducts.

3. Section 233300 "Air Duct Accessories" for dampers, sound-control devices, ductmounting access doors and panels, turning vanes, and flexible ducts.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of the following products:

1. Sealants and gaskets.

2. Seismic-restraint devices.

B. Shop Drawings:

1. Fabrication, assembly, and installation, including plans, elevations, sections, components, and attachments to other work.

2. Factory- and shop-fabricated ducts and fittings.

3. Duct layout indicating sizes, configuration, liner material, and static-pressure classes.

4. Elevation of top and bottom of ducts.

5. Dimensions of all duct runs from building grid lines.

6. Fittings.

7. Reinforcement and spacing.

8. Seam and joint construction.

9. Penetrations through fire-rated and other partitions.

10. Equipment installation based on equipment being used on Project.

11. Locations for duct accessories, including dampers, turning vanes, and access doors and panels.

12. Hangers and supports, including methods for duct and building attachment, seismic restraints, and vibration isolation.
332
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 2
C. Delegated Design Submittals:

1. Sheet metal thicknesses.

2. Joint and seam construction and sealing.

3. Reinforcement details and spacing.

4. Materials, fabrication, assembly, and spacing of hangers and supports.

5. Design Calculations: Calculations, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation for selecting hangers and supports and seismic restraints.

1.3 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: A single set of plans or BIM model, drawn to scale, showing the items described in this Section, and coordinated with all building trades.

B. Welding certificates.

C. Field quality-control reports.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Delegated Duct Design: Duct construction, including sheet metal thicknesses, seam and joint construction, reinforcements, and hangers and supports, comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" and with performance requirements and design criteria indicated in "Duct Schedule" Article.

B. Structural Performance: Duct hangers and supports and seismic restraints are to withstand the effects of gravity and seismic loads and stresses within limits and under conditions described in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" and ASCE/SEI 7.

Seismically brace duct hangers and supports in accordance with SMACNA's "Seismic Restraint Manual: Guidelines for Mechanical Systems.".

C. Seismic Performance: Ductwork to withstand the effects of earthquake motions determined in accordance with ASCE/SEI 7. See Section 230548 "Vibration and Seismic Controls for HVAC."

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."

2. Component Importance Factor: 1.0.

D. Wind Performance: Ducts are to withstand the effects of wind determined in accordance with to ASCE/SEI 7. See Section 230548 "Vibration and Seismic Controls for HVAC." E. Airstream Surfaces: Surfaces in contact with airstream comply with requirements in ASHRAE 62.1.
333
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 3
F. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment," and Section 7 - "Construction and System Startup." G. ASHRAE/IES Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6.4.4 - "HVAC System Construction and Insulation."
H. Duct Dimensions: Unless otherwise indicated, all duct dimensions indicated on Drawings are inside clear dimensions and do not include insulation or duct wall thickness.

2.2 SINGLE-WALL RECTANGULAR DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" based on indicated static-pressure class unless otherwise indicated.

1. Construct ducts of galvanized sheet steel unless otherwise indicated.

B. Transverse Joints: Fabricate joints in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 2-1, "Rectangular Duct/Transverse Joints," for staticpressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."

1. For ducts with longest side less than 36 inches (914 mm), select joint types in accordance with Figure 2-1.

2. For ducts with longest side 36 inches (914 mm) or greater, use flange joint connector Type T-22, T-24, T-24A, T-25a, or T-25b. Factory-fabricated flanged duct connection system may be used if submitted and approved by engineer of record.

C. Longitudinal Seams: Select seam types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 2-2, "Rectangular Duct/Longitudinal Seams," for static-pressure class, applicable sealing requirements, materials involved, ductsupport intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible." All longitudinal seams are to be Pittsburgh lock seams unless otherwise specified for specific application.

D. Elbows, Transitions, Offsets, Branch Connections, and Other Duct Construction: Select types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Ch. 4, "Fittings and Other Construction," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."

2.3 SINGLE-WALL ROUND DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Ch. 3, "Round, Oval, and Flexible Duct," based on indicated static-pressure class unless otherwise indicated.

1. Construct ducts of galvanized sheet steel unless otherwise indicated. 334
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 4
B. Source Limitations: Obtain single-wall round ducts and fittings from single manufacturer.

C. Transverse Joints: Select joint types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-1, "Round Duct Transverse Joints," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
D. Longitudinal Seams: Select seam types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-2, "Round Duct Longitudinal Seams," for static-pressure class, applicable sealing requirements, materials involved, ductsupport intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."

1. Fabricate round ducts larger than 90 inches (2286 mm) in diameter with butt-welded longitudinal seams.

2. Fabricate flat-oval ducts larger than 72 inches (1830 mm) in width (major dimension) with butt-welded longitudinal seams.

E. Tees and Laterals: Select types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-5, "90 Degree Tees and Laterals," and Figure 3-6, "Conical Tees," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."

2.4 SHEET METAL MATERIALS
A. General Material Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for acceptable materials, material thicknesses, and duct construction methods unless otherwise indicated. Sheet metal materials are to be free of pitting, seam marks, roller marks, stains, discolorations, and other imperfections.

B. Galvanized Sheet Steel: Comply with ASTM A653/A653M.

1. Galvanized Coating Designation: G60 (Z180).

2. Coating Materials: Acceptable to authorities having jurisdiction for use on ducts listed and labeled by an NRTL for compliance with UL 181, Class 1.

C. Factory- or Shop-Applied Antimicrobial Coating:

1. Apply to the surface of sheet metal that will form the interior surface of the duct. An untreated clear coating is to be applied to the exterior surface.

2. Antimicrobial compound is to be tested for efficacy by an NRTL and registered by the EPA for use in HVAC systems.

3. Coating containing the antimicrobial compound is to have a hardness of 2H, minimum, when tested in accordance with ASTM D3363.

4. Surface-Burning Characteristics: Maximum flame-spread index of 25 and maximum smoke-developed index of 50 when tested in accordance with UL 723; certified by an NRTL.

5. Shop-Applied Coating Color: White.
335
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 5

6. Antimicrobial coating on sheet metal is not required for duct containing liner treated with antimicrobial coating.

D. Reinforcement Shapes and Plates: ASTM A36/A36M, steel plates, shapes, and bars; black and galvanized.

1. Where black- and galvanized-steel shapes and plates are used to reinforce aluminum ducts, isolate the different metals with butyl rubber, neoprene, or EPDM gasket materials.

E. Tie Rods: Galvanized steel, 1/4-inch- (6-mm-) minimum diameter for lengths 36 inches (900 mm) or less; 3/8-inch- (10-mm-) minimum diameter for lengths longer than 36 inches (900 mm).

2.5 SEALANT AND GASKETS
A. General Sealant and Gasket Requirements: Surface-burning characteristics for sealants and gaskets are to be a maximum flame-spread index of 25 and a maximum smoke-developed index of 50 when tested in accordance with UL 723; certified by an NRTL.

B. Two-Part Tape Sealing System:

1. Tape: Woven cotton fiber impregnated with mineral gypsum and modified acrylic/silicone activator to react exothermically with tape to form hard, durable, airtight seal.

2. Tape Width: 3 inches (76 mm).

3. Sealant: Modified styrene acrylic.

4. Water resistant.

5. Mold and mildew resistant.

6. Maximum Static-Pressure Class: 10 inch wg (2500 Pa), positive and negative.

7. Service: Indoor and outdoor.

8. Service Temperature: Minus 40 to plus 200 deg F (Minus 40 to plus 93 deg C).

9. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum.

C. Water-Based Joint and Seam Sealant:

1. Application Method: Brush on.

2. Solids Content: Minimum 65 percent.

3. Shore A Hardness: Minimum 20.

4. Water resistant.

5. Mold and mildew resistant.

6. VOC: Maximum 75 g/L (less water).

7. Maximum Static-Pressure Class: 10 inch wg (2500 Pa), positive and negative.

8. Service: Indoor or outdoor.

9. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum sheets.

D. Solvent-Based Joint and Seam Sealant:

1. Application Method: Brush on.
336
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 6

2. Base: Synthetic rubber resin.

3. Solvent: Toluene and heptane.

4. Solids Content: Minimum 60 percent.

5. Shore A Hardness: Minimum 60.

6. Water resistant.

7. Mold and mildew resistant.

8. Maximum Static-Pressure Class: 10-inch wg (2500 Pa), positive or negative.

9. Service: Indoor or outdoor.

10. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum sheets.

E. Flanged Joint Sealant: Comply with ASTM C920.

1. General: Single-component, acid-curing, silicone, elastomeric.

2. Type: S.

3. Grade: NS.

4. Class: 25.

5. Use: O.

F. Flange Gaskets: Butyl rubber, neoprene, or EPDM polymer with polyisobutylene plasticizer.

G. Round Duct Joint O-Ring Seals:

1. Seal is to provide maximum leakage class of 3 cfm/100 sq. ft. at 1-inch wg (0.14 L/s per sq. m at 250 Pa) and is to be rated for10-inch wg (2500-Pa) static-pressure class, positive or negative.

2. EPDM O-ring to seal in concave bead in coupling or fitting spigot.

3. Double-lipped, EPDM O-ring seal, mechanically fastened to factory-fabricated couplings and fitting spigots.

2.6 HANGERS AND SUPPORTS
A. Hanger Rods for Noncorrosive Environments: Galvanized-steel rods and nuts.

B. Hanger Rods for Corrosive Environments: Electrogalvanized, all-thread rods or galvanized rods with threads painted with zinc-chromate primer after installation.

C. Strap and Rod Sizes: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Table 5-1 (Table 5-1M), "Rectangular Duct Hangers Minimum Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct."
D. Steel Cables for Galvanized-Steel Ducts: Galvanized steel complying with ASTM A603.

E. Steel Cables for Stainless Steel Ducts: Stainless steel complying with ASTM A492.

F. Steel Cable End Connections: Galvanized-steel assemblies with brackets, swivel, and bolts designed for duct hanger service; with an automatic-locking and clamping device.

G. Duct Attachments: Sheet metal screws, blind rivets, or self-tapping metal screws; compatible with duct materials.
337
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 7
H. Trapeze and Riser Supports:

1. Supports for Galvanized-Steel Ducts: Galvanized-steel shapes and plates.

PART 3 - EXECUTION

3.1 DUCT INSTALLATION
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of duct system. Indicated duct locations, configurations, and arrangements were used to size ducts and calculate friction loss for air-handling equipment sizing and for other design considerations.

Install duct systems as indicated unless deviations to layout are approved on Shop Drawings and coordination drawings.

B. Install ducts in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" unless otherwise indicated.

C. Install ducts in maximum practical lengths with fewest possible joints.

D. Install factory- or shop-fabricated fittings for changes in direction, size, and shape and for branch connections.

E. Unless otherwise indicated, install ducts vertically and horizontally, and parallel and perpendicular to building lines.

F. Install ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building.

G. Install ducts with a clearance of 1 inch (25 mm), plus allowance for insulation thickness.

H. Route ducts to avoid passing through transformer vaults and electrical equipment rooms and enclosures.

I. Install heating coils, cooling coils, air filters, dampers, and all other duct-mounted accessories in air ducts where indicated on Drawings.

J. Protect duct interiors from moisture, construction debris and dust, and other foreign materials both before and after installation. Comply with SMACNA's "IAQ Guidelines for Occupied Buildings Under Construction," Appendix G, "Duct Cleanliness for New Construction Guidelines."
K. Elbows: Use long-radius elbows wherever they fit.

1. Fabricate 90-degree rectangular mitered elbows to include turning vanes.

2. Fabricate 90-degree round elbows with a minimum of three segments for 12 inches (300 mm) and smaller and a minimum of five segments for 14 inches (350 mm) and larger.

L. Branch Connections: Use lateral or conical branch connections. 338
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 8

3.2 DUCT SEALING
A. Seal ducts for duct static-pressure, seal classes, and leakage classes specified in "Duct Schedule" Article in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
B. Seal ducts at a minimum to the following seal classes in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible":

1. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."

2. Outdoor, Supply-Air Ducts: Seal Class A.

3. Outdoor, Exhaust Ducts: Seal Class C.

4. Outdoor, Return-Air Ducts: Seal Class C.

5. Unconditioned Space, Supply-Air Ducts in Pressure Classes 2-Inch wg (500 Pa) and Lower: Seal Class B.

6. Unconditioned Space, Supply-Air Ducts in Pressure Classes Higher Than 2-Inch wg (500 Pa): Seal Class A.

7. Unconditioned Space, Exhaust Ducts: Seal Class C.

8. Unconditioned Space, Return-Air Ducts: Seal Class B.

9. Conditioned Space, Supply-Air Ducts in Pressure Classes 2-Inch wg (500 Pa) and Lower:

Seal Class C.

10. Conditioned Space, Supply-Air Ducts in Pressure Classes Higher Than 2-Inch wg (500 Pa): Seal Class B.

11. Conditioned Space, Exhaust Ducts: Seal Class B.

12. Conditioned Space, Return-Air Ducts: Seal Class C.

3.3 HANGER AND SUPPORT INSTALLATION
A. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Chapter 5, "Hangers and Supports."
B. Building Attachments: Concrete inserts, powder-actuated fasteners, or structural-steel fasteners appropriate for construction materials to which hangers are being attached.

1. Where practical, install concrete inserts before placing concrete.

2. Install powder-actuated concrete fasteners after concrete is placed and completely cured.

3. Use powder-actuated concrete fasteners for standard-weight aggregate concretes or for slabs more than 4 inches (100 mm) thick.

4. Do not use powder-actuated concrete fasteners for lightweight-aggregate concretes or for slabs less than 4 inches (100 mm) thick.

5. Do not use powder-actuated concrete fasteners for seismic restraints. Coordinate with Section 230548 "Vibration and Seismic Controls for HVAC." C. Hanger Spacing: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Table 5-1 (Table 5-1M), "Rectangular Duct Hangers Minimum Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct," for maximum hanger spacing; install hangers and supports within 24 inches (610 mm) of each elbow and within 48 inches (1220 mm) of each branch intersection.

D. Hangers Exposed to View: Threaded rod and angle or channel supports. 339
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 9
E. Support vertical ducts with steel angles or channel secured to the sides of the duct with welds, bolts, sheet metal screws, or blind rivets; support at each floor and at a maximum interval of 16 feet (5 m).

F. Install upper attachments to structures. Select and size upper attachments with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

3.4 SEISMIC-RESTRAINT-DEVICE INSTALLATION
A. See Section 230548 "Vibration and Seismic Controls for HVAC" for seismic restraint installation requirements.

3.5 DUCTWORK CONNECTIONS
A. Make connections to equipment with flexible connectors complying with Section 233300 "Air Duct Accessories."
B. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for branch, outlet and inlet, and terminal unit connections.

3.6 FIELD QUALITY CONTROL
A. Perform tests and inspections.

B. Leakage Tests:

1. Comply with SMACNA's "HVAC Air Duct Leakage Test Manual." Submit a test report for each test.

2. Test the following systems:
a. Supply Ducts with a Pressure Class of 2 (500) Inch wg (Pa) or Higher: Test representative duct sections, selected by Architect from sections installed, totaling no less than 50 percent of total installed duct area for each designated pressure class.
b. Return Ducts with a Pressure Class of 2 (500) Inch wg (Pa) or Higher: Test representative duct sections, selected by Architect from sections installed, totaling no less than 50 percent of total installed duct area for each designated pressure class.
c. Exhaust Ducts with a Pressure Class of 2 (500) Inch wg (Pa) or Higher: Test representative duct sections, selected by Architect from sections installed, totaling no less than 50 percent of total installed duct area for each designated pressure class.

3. Disassemble, reassemble, and seal segments of systems to accommodate leakage testing and for compliance with test requirements.

4. Testing of each duct section is to be performed with access doors, coils, filters, dampers, and other duct-mounted devices in place as designed. No devices are to be removed or blanked off so as to reduce or prevent additional leakage.

5. Test for leaks before applying external insulation.
340
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 10

6. Conduct tests at static pressures equal to maximum design pressure of system or section being tested. If static-pressure classes are not indicated, test system at maximum system design pressure. Do not pressurize systems above maximum design operating pressure.

7. Give seven days' advance notice for testing.

C. Duct System Cleanliness Tests:

1. Visually inspect duct system to ensure that no visible contaminants are present.

2. Test sections of metal duct system, chosen randomly by Owner, for cleanliness in accordance with "Description of Method 3 - NADCA Vacuum Test" in NADCA ACR, "Assessment, Cleaning and Restoration of HVAC Systems." a. Acceptable Cleanliness Level: Net weight of debris collected on the filter media is to not exceed 0.75 mg/100 sq. cm.

D. Duct system will be considered defective if it does not pass tests and inspections.

E. Prepare test and inspection reports.

3.7 DUCT CLEANING
A. Clean new duct system(s) before testing, adjusting, and balancing.

B. For cleaning of existing ductwork, see Section 230130.52 "Existing HVAC Air Distribution System Cleaning."
C. Use duct cleaning methodology as indicated in NADCA ACR.

D. Use service openings for entry and inspection.

1. Provide openings with access panels appropriate for duct static-pressure and leakage class at dampers, coils, and any other locations where required for inspection and cleaning access. Provide insulated panels for insulated or lined duct. Patch insulation and liner as recommended by duct liner manufacturer. Comply with Section 233300 "Air Duct Accessories" for access panels and doors.

2. Disconnect and reconnect flexible ducts as needed for cleaning and inspection.

3. Remove and reinstall ceiling to gain access during the cleaning process.

E. Particulate Collection and Odor Control:

1. When venting vacuuming system inside the building, use HEPA filtration with 99.97 percent collection efficiency for 0.3-micron-size (or larger) particles.

2. When venting vacuuming system to outdoors, use filter to collect debris removed from HVAC system, and locate exhaust downwind and away from air intakes and other points of entry into building.

F. Clean the following components by removing surface contaminants and deposits:

1. Air outlets and inlets (registers, grilles, and diffusers). 341
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
METAL DUCTS 233113 - 11

2. Supply, return, and exhaust fans including fan housings, plenums (except ceiling supply and return plenums), scrolls, blades or vanes, shafts, baffles, dampers, and drive assemblies.

3. Air-handling unit internal surfaces and components including mixing box, coil section, air wash systems, spray eliminators, condensate drain pans, humidifiers and dehumidifiers, filters and filter sections, and condensate collectors and drains.

4. Coils and related components.

5. Return-air ducts, dampers, actuators, and turning vanes except in ceiling plenums and mechanical equipment rooms.

6. Supply-air ducts, dampers, actuators, and turning vanes.

7. Dedicated exhaust and ventilation components and makeup air systems.

G. Mechanical Cleaning Methodology:

1. Clean metal duct systems using mechanical cleaning methods that extract contaminants from within duct systems and remove contaminants from building.

2. Use vacuum-collection devices that are operated continuously during cleaning. Connect vacuum device to downstream end of duct sections so areas being cleaned are under negative pressure.

3. Use mechanical agitation to dislodge debris adhered to interior duct surfaces without damaging integrity of metal ducts, duct liner, or duct accessories.

4. Clean fibrous-glass duct liner with HEPA vacuuming equipment; do not permit duct liner to get wet. Replace fibrous-glass duct liner that is damaged, deteriorated, or delaminated or that has friable material, mold, or fungus growth.

5. Clean coils and coil drain pans in accordance with NADCA ACR. Keep drain pan operational. Rinse coils with clean water to remove latent residues and cleaning materials; comb and straighten fins.

6. Provide drainage and cleanup for wash-down procedures.

7. Antimicrobial Agents and Coatings: Apply EPA-registered antimicrobial agents if fungus is present. Apply antimicrobial agents in accordance with manufacturer's written instructions after removal of surface deposits and debris.

3.8 STARTUP
A. Air Balance: Comply with requirements in Section 230593 "Testing, Adjusting, and Balancing for HVAC."
END OF SECTION 233113
342
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 1
SECTION 233300 - AIR DUCT ACCESSORIES
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Backdraft and pressure relief dampers.

2. Manual volume dampers.

3. Flange connectors.

4. Duct-mounted access doors.

5. Flexible connectors.

6. Duct accessory hardware.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. For duct silencers, include pressure drop, dynamic insertion loss, and self-generated noise data. Include breakout noise calculations for high-transmission-loss casings.

B. Sustainable Design Submittals:

C. Shop Drawings: For duct accessories. Include plans, elevations, sections, details, and attachments to other work.

1. Detail duct accessories' fabrication and installation in ducts and other construction.

Include dimensions, weights, loads, and required clearances; and method of field assembly into duct systems and other construction. Include the following:
a. Special fittings.
b. Manual volume damper installations.
c. Control-damper installations.
d. Fire-damper, smoke-damper, combination fire- and smoke-damper, ceiling, and corridor-damper installations, including sleeves; and duct-mounted access doors and remote damper operators.
e. Duct security bars.

1.3 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Reflected ceiling plans, or BIM model, drawn to scale, on which ceiling-mounted access panels and access doors required for access to duct accessories are shown and coordinated with each other, using input from installers of the items involved.

B. Source quality-control reports.
343
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 2

1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For air duct accessories to include in operation and maintenance manuals.

1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Fusible Links: Furnish quantity equal to 10 percent of amount installed.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Comply with NFPA 90A and NFPA 90B.

B. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for acceptable materials, material thicknesses, and duct construction methods unless otherwise indicated. Sheet metal materials shall be free of pitting, seam marks, roller marks, stains, discolorations, and other imperfections.

2.2 BACKDRAFT AND PRESSURE RELIEF DAMPERS
A. Description: Gravity balanced.

B. Performance:

1. Maximum Air Velocity: 1250 fpm (6.4 m/s).

2. Maximum System Pressure: 0.8 inch wg.

3. AMCA Certification: Test and rate in accordance with AMCA 511.

4. Leakage:
a. Class IA: Leakage shall not exceed 3 cfm/sq. ft. (15.2 L/s per sq. m) against 1-inch wg (250-Pa) differential static pressure.

C. Construction:

1. Frame:
a. Hat shaped.
b. 16-gauge- (1.6-mm-) thick, galvanized sheet steel

2. Blades:
a. Multiple single-piece blades.
344
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 3
b. Center pivoted, maximum 6-inch (150-mm) width, 26-gauge (0.48-mm) Type 304 stainless steel

3. Blade Action: Parallel.

D. Blade Seals: Neoprene, mechanically locked.

E. Blade Axles:

1. Material: Stainless steel.

2. Diameter: 0.20 inch (5 mm).

F. Tie Bars and Brackets: Aluminum.

G. Return Spring: Adjustable tension.

H. Bearings: Steel ball.

I. Damper Actuator - Electric:

1. Electric - 120 V ac.

2. UL 873 plenum rated.

3. Two position.
a. Sufficient motor torque and spring torque to drive damper fully closed with adequate force to achieve required damper seal.
b. Minimum 90-degree drive rotation.

4. Clockwise or counterclockwise drive rotation as required for application.

5. Environmental Operating Range:
a. Temperature: Minus 40 to plus 130 deg F (Minus 40 to plus 55 deg C). b. Humidity: 5 to 95 percent relative humidity noncondensing.

6. Environmental Enclosure: NEMA 2.

7. Actuator to be factory mounted and provided with a single-point wiring connection.

J. Controllers, Electrical Devices, and Wiring:

1. Electrical Connection: 115 V, single phase, 60 Hz.

K. Accessories:

1. Adjustment device to permit setting for varying differential static pressure.

2. Counterweights and spring-assist kits for vertical airflow installations.

3. Chain pulls.

4. Screen Mounting:
a. Front mounted in sleeve.
1) Sleeve Thickness: 20 gauge (1.0 mm) minimum.
2) Sleeve Length: 6 inches (150 mm) minimum.
345
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 4

5. Screen Material: Galvanized steel.

6. Screen Type: Insect.

7. 90-degree stops.

2.3 MANUAL VOLUME DAMPERS
A. Standard, Steel, Manual Volume Dampers:

1. Performance:
a. Leakage Rating Class III: Leakage not exceeding 40 cfm/sq. ft. (203 L/s per sq. m) against 1-inch wg (250-Pa) differential static pressure.

2. Construction:
a. Linkage out of airstream.
b. Suitable for horizontal or vertical airflow applications.

3. Frames:
a. Hat-shaped, 18-gauge- (1.3-mm-) thick stainless steel. b. Mitered and welded corners.
c. Flanges for attaching to walls and flangeless frames for installing in ducts.

4. Blades:
a. Multiple or single blade.
b. Parallel- or opposed-blade design.
c. Stiffen damper blades for stability.
d. Stainless steel; 16 gauge (1.6 mm) thick.

5. Blade Axles: Stainless steel.

6. Bearings:
a. Oil-impregnated stainless steel sleeve.
b. Dampers mounted with vertical blades to have thrust bearing at each end of every blade.

7. Tie Bars and Brackets: Galvanized steel.

8. Locking device to hold damper blades in a fixed position without vibration.

B. Standard, Aluminum, Manual Volume Dampers:

1. Performance:
a. Leakage Rating Class III: Leakage not exceeding 40 cfm/sq. ft. (203 L/s per sq. m) against 1-inch wg (250-Pa) differential static pressure.

2. Construction:
a. Linkage out of airstream.
b. Suitable for horizontal or vertical airflow applications. 346
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 5

3. Frames:
a. Hat-shaped, 0.10-inch- (2.5-mm-) thick, aluminum sheet channels. b. Flanges for attaching to walls and flangeless frames for installing in ducts.

4. Blades:
a. Multiple or single blade.
b. Parallel- or opposed-blade design.
c. Stiffen damper blades for stability.
d. Roll-Formed Aluminum Blades: 0.10-inch- (2.5-mm-) thick aluminum sheet. e. Extruded-Aluminum Blades: 0.050-inch- (1.2-mm-) thick extruded aluminum.

5. Blade Axles: Stainless steel.

6. Bearings:
a. Stainless steel sleeve.
b. Dampers mounted with vertical blades to have thrust bearing at each end of every blade.

7. Tie Bars and Brackets: Aluminum.

8. Locking device to hold damper blades in a fixed position without vibration.

C. Low-Leakage, Steel, Manual Volume Dampers:

1. Performance:
a. AMCA Certification: Test and rate in accordance with AMCA 511. b. Leakage:
1) Class IA: Leakage shall not exceed 3 cfm/sq. ft. (15.2 L/s per sq. m) against 1-inch wg (250-Pa) differential static pressure.

2. Construction:
a. Linkage: Out of airstream.
b. Suitable for horizontal or vertical airflow applications.

3. Frames:
a. Hat, U, or angle shaped.
b. Thickness: 18-gauge (1.3-mm) stainless steel.
c. Mitered and welded corners.
d. Flanges for attaching to walls and flangeless frames for installing in ducts.

4. Blades:
a. Multiple or single blade.
b. Parallel- or opposed-blade design.
c. Stiffen damper blades for stability.
d. Stainless, roll-formed steel; 16 gauge (1.6 mm) thick. 347
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 6

5. Blade Edging Seals:
a. Inflatable seal blade edging or replaceable rubber seals.

6. Blade Jamb Seals: Flexible metal compression type.

7. Blade Axles: Stainless steel.

8. Bearings:
a. Oil-impregnated stainless steel sleeve.
b. Dampers mounted with vertical blades to have thrust bearing at each end of every blade.

9. Tie Bars and Brackets: Aluminum.

10. Locking device to hold damper blades in a fixed position without vibration. a. AMCA Certification: Test and rate in accordance with AMCA 511. b. Leakage:
1) Class IA: Leakage shall not exceed 3 cfm/sq. ft. (15.2 L/s per sq. m) against 1-inch wg (250-Pa) differential static pressure.

11. Construction:
a. Linkage out of airstream.
b. Suitable for horizontal or vertical airflow applications.

12. Frames:
a. Hat, U, or angle shaped.
b. Thickness: 0.08-inch (2.0-mm) aluminum sheet channels. c. Flanges for attaching to walls and flangeless frames for installing in ducts.

13. Blades:
a. Multiple or single blade.
b. Parallel- or opposed-blade design.
c. Extruded-Aluminum Blades: 0.050-inch- (1.2-mm-) thick extruded aluminum.

14. Blade Edging Seals:
a. PVC.
b. Inflatable seal blade edging or replaceable rubber seals.

15. Blade Jamb Seals: Flexible metal compression type.

16. Blade Axles: Stainless steel.

17. Bearings:
a. Oil-impregnated stainless steel sleeve.
b. Dampers mounted with vertical blades to have thrust bearings at each end of every blade.

18. Tie Bars and Brackets: Aluminum.
348
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 7

19. Locking device to hold damper blades in a fixed position without vibration.

D. Jackshaft:

1. Size: 0.5-inch (13-mm) diameter.

2. Material: Galvanized-steel pipe rotating within pipe-bearing assembly mounted on supports at each mullion and at each end of multiple-damper assemblies.

3. Length and Number of Mountings: As required to connect linkage of each damper in multiple-damper assembly.

E. Damper Hardware:

1. Zinc-plated, die-cast core with dial and handle, made of 3/32-inch- (2.4-mm-) thick zincplated steel, and a 3/4-inch (19-mm) hexagon locking nut.

2. Include center hole to suit damper operating-rod size.

3. Include elevated platform for insulated duct mounting.

2.4 FLANGE CONNECTORS
A. Description: Add-on or roll-formed, factory fabricated, slide-on transverse flange connectors, gaskets, and components.

B. Material: Galvanized steel.

C. Gauge and Shape: Match connecting ductwork.

2.5 DUCT-MOUNTED ACCESS DOORS
A. Duct-Mounted Access Doors: Fabricate access panels in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible"; Figure 7-2 (7-2M), "Duct Access Doors and Panels," and Figure 7-3, "Access Doors - Round Duct."

1. Door:
a. Double wall, rectangular.
b. Galvanized sheet metal with insulation fill and thickness as indicated for duct pressure class.
c. 24-gauge- (0.70-mm-) thick galvanized steel or 0.032-inch (0.81-mm) thick aluminum or 24-gauge- (0.70-mm-) thick stainless steel door panel. d. Vision panel.
e. Hinges and Latches: 1-by-1-inch (25-by-25-mm) butt or piano hinge and cam latches.
f. Fabricate doors airtight and suitable for duct pressure class.

2. Frame: Galvanized sheet steel, with bend-over tabs and foam gaskets. a. 24-gauge- (0.70-mm-) thick galvanized steel or 0.032-inch- (0.81-mm-) thick aluminum frame.
349
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 8

3. Number of Hinges and Locks:
a. Access Doors Less Than 12 Inches (300 mm) Square: No hinges and two sash locks.
b. Access Doors up to 18 Inches (460 mm) Square: Two hinges and two sash locks. c. Access Doors up to 24 by 48 Inches (600 by 1200 mm): Three hinges and two compression latches with outside and inside handles.
d. Access Doors Larger Than 24 by 48 Inches (600 by 1200 mm): Four hinges and two compression latches with outside and inside handles.

B. Pressure Relief Access Door:

1. Door and Frame Material: Galvanized sheet steel.
a. 24-gauge- (0.70-mm-) thick galvanized steel or 0.032?inch- ((0.81-mm-)) thick aluminum or 24-gauge- (0.70-mm-) thick stainless steel door panel.

2. Door: Single wall with metal thickness applicable for duct pressure class.

3. Operation: Open outward for positive-pressure ducts and inward for negative-pressure ducts.

4. Factory set at 3.0 to 8.0 inches wg (800 to 2000 Pa).

5. Doors close when pressures are within set-point range.

6. Hinge: Continuous piano.

7. Latches: Cam.

8. Seal: Neoprene or foam rubber.

9. Insulation Fill: 1-inch- (25-mm-) thick, fibrous-glass or polystyrene-foam board.

2.6 FLEXIBLE CONNECTORS
A. Fire-Performance Characteristics: Adhesives, sealants, fabric materials, and accessory materials shall have flame-spread index not exceeding 25 and smoke-developed index not exceeding 50 when tested in accordance with ASTM E84.

B. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

C. Materials: Flame-retardant or noncombustible fabrics.

D. Coatings and Adhesives: Comply with UL 181, Class 1.

E. Metal-Edged Connectors: Factory fabricated with a fabric strip 5-3/4 inches (146 mm) wide attached to two strips of 2-3/4-inch- (70-mm-) wide, 0.028-inch- (0.7-mm-) thick, galvanized sheet steel or 0.032-inch- (0.8-mm-) thick aluminum sheets. Provide metal compatible with connected ducts.

F. Indoor System, Flexible Connector Fabric: Glass fabric double coated with neoprene.

1. Minimum Weight: 26 oz./sq. yd. (880 g/sq. m).

2. Tensile Strength: 480 lbf/inch (84 N/mm) in the warp and 360 lbf/inch (63 N/mm).in the filling.
350
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 9

3. Service Temperature: Minus 40 to plus 200 deg F (Minus 40 to plus 93 deg C).

G. Thrust Limits: Combination coil spring and elastomeric insert with spring and insert in compression, and with a load stop. Include rod and angle-iron brackets for attaching to fan discharge and duct.

1. Frame: Steel, fabricated for connection to threaded rods and to allow for a maximum of 30 degrees of angular rod misalignment without binding or reducing isolation efficiency.

2. Outside Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load.

3. Minimum Additional Travel: 50 percent of the required deflection at rated load.

4. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

5. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

6. Elastomeric Element: Molded, oil-resistant rubber or neoprene.

7. Coil Spring: Factory set and field adjustable for a maximum of movement at start and stop.

2.7 DUCT ACCESSORY HARDWARE
A. Instrument Test Holes: Cast iron or cast aluminum to suit duct material, including screw cap and gasket. Size to allow insertion of pitot tube and other testing instruments and of length to suit duct-insulation thickness.

B. Adhesives: High strength, quick setting, neoprene based, waterproof, and resistant to gasoline and grease.

2.8 MATERIALS
A. Galvanized Sheet Steel: Comply with ASTM A653/A653M.

1. Galvanized Coating Designation: G90 (Z275).

2. Exposed-Surface Finish: Mill phosphatized.

B. Stainless Steel Sheets: Comply with ASTM A480/A480M, Type 304, and having a No. 2 finish for concealed ducts.

C. Aluminum Sheets: Comply with ASTM B209 (ASTM B209M), Alloy 3003, Temper H14; with mill finish for concealed ducts and standard, one-side bright finish for exposed ducts.

D. Extruded Aluminum: Comply with ASTM B221 (ASTM B221M), Alloy 6063, Temper T6.

E. Reinforcement Shapes and Plates: Galvanized-steel reinforcement where installed on galvanized sheet metal ducts; compatible materials for aluminum and stainless steel ducts.

F. Tie Rods: Galvanized steel, 1/4-inch (6-mm) minimum diameter for lengths 36 inches (900 mm) or less; 3/8-inch (10-mm) minimum diameter for lengths longer than 36 inches (900 mm). 351
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 10
PART 3 - EXECUTION

3.1 INSTALLATION
A. Install duct accessories in accordance with applicable details in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for metal ducts and in NAIMA AH116 for fibrous-glass ducts.

B. Install duct accessories of materials suited to duct materials; use galvanized-steel accessories in galvanized-steel and fibrous-glass ducts, stainless steel accessories in stainless steel ducts, and aluminum accessories in aluminum ducts.

C. Install backdraft dampers at inlet of exhaust fans or exhaust ducts as close as possible to exhaust fan unless otherwise indicated.

D. Where multiple damper sections are necessary to achieve required dimensions, provide reinforcement to fully support damper assembly when fully closed at full system design static pressure.

E. Install volume dampers at points on supply, return, and exhaust systems where branches extend from larger ducts. Where dampers are installed in ducts having duct liner, install dampers with hat channels of same depth as liner, and terminate liner with nosing at hat channel.

1. Install steel volume dampers in steel ducts.

2. Install aluminum volume dampers in aluminum ducts.

F. Set dampers to fully open position before testing, adjusting, and balancing.

G. Install test holes at fan inlets and outlets and elsewhere as indicated and as needed for testing and balancing.

H. Install duct access doors on sides of ducts to allow for inspecting, adjusting, and maintaining accessories and equipment at the following locations:

1. On both sides of duct coils.

2. Upstream and downstream from duct filters.

3. At outdoor-air intakes and mixed-air plenums.

4. At drain pans and seals.

5. Downstream from manual volume dampers, control dampers, backdraft dampers, and equipment.

6. Adjacent to and close enough to fire or smoke dampers, to reset or reinstall fusible links.

Access doors for access to fire or smoke dampers having fusible links shall be pressure relief access doors and shall be outward operation for access doors installed upstream from dampers and inward operation for access doors installed downstream from dampers.

7. At each change in direction and at maximum 50-ft. (15-m) spacing.

8. Upstream and downstream from turning vanes.

9. Upstream or downstream from duct silencers.

10. For grease ducts, install at locations and spacing as required by NFPA 96.

11. Control devices requiring inspection.

12. Elsewhere as indicated.
352
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR DUCT ACCESSORIES 233300 - 11
I. Install access doors with swing against duct static pressure.

J. Access Door Sizes:

1. One-Hand or Inspection Access: 8 by 5 inches (200 by 125 mm).

2. Two-Hand Access: 12 by 6 inches (300 by 150 mm).

3. Head and Hand Access: 18 by 10 inches (460 by 250 mm).

4. Head and Shoulders Access: 21 by 14 inches (530 by 355 mm).

5. Body Access: 25 by 14 inches (635 by 355 mm).

6. Body plus Ladder Access: 25 by 17 inches (635 by 430 mm).

K. Install flexible connectors to connect ducts to equipment.

L. For fans developing static pressures of 5 inches wg (1250 Pa) and more, cover flexible connectors with loaded vinyl sheet held in place with metal straps.

M. Install duct test holes where required for testing and balancing purposes.

N. Install thrust limits at centerline of thrust, symmetrical on both sides of equipment. Attach thrust limits at centerline of thrust and adjust to a maximum of 1/4-inch (6-mm) movement during start and stop of fans.

3.2 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. Operate dampers to verify full range of movement.

2. Inspect locations of access doors, and verify that size and location of access doors are adequate to perform required operation.

END OF SECTION 233300
353
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REGISTERS AND GRILLES 233713.23 - 1
SECTION 233713.23 - REGISTERS AND GRILLES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Fixed face registers.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Data Sheet: Indicate materials of construction, finish, and mounting details; and performance data including throw and drop, static-pressure drop, and noise ratings.

2. Register and Grille Schedule: Indicate drawing designation, room location, quantity, model number, size, and accessories furnished.

B. Samples: For each exposed product and for each color and texture specified. Smallest size register and grille indicated.

1.4 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Method of attaching hangers to building structure.

2. Ceiling-mounted items including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and special moldings.

3. Duct access panels.

B. Source quality-control reports.

PART 2 - PRODUCTS

2.1 REGISTERS
A. Fixed Face Register:
354
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REGISTERS AND GRILLES 233713.23 - 2

1. Hart Cooley Model 814OB or approved equal

2. Material: Steel.

3. Finish: Baked enamel, white.

4. Core Construction: Integral.

5. Frame: 1-1/4 inches (32 mm) wide.

6. Mounting: Countersunk screw.

7. Damper Type: Adjustable opposed blade.

2.2 SOURCE QUALITY CONTROL
A. Verification of Performance: Rate registers and grilles according to ASHRAE 70, "Method of Testing for Rating the Performance of Air Outlets and Inlets." PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas where registers and grilles are installed for compliance with requirements for installation tolerances and other conditions affecting performance of equipment.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Install registers level and plumb.

B. Outlets and Inlets Locations: Drawings indicate general arrangement of ducts, fittings, and accessories. Air outlet and inlet locations have been indicated to achieve design requirements for air volume, noise criteria, airflow pattern, throw, and pressure drop. Make final locations where indicated, as much as practical. For units installed in lay-in ceiling panels, locate units in the center of panel. Where architectural features or other items conflict with installation, notify Architect for a determination of final location.

C. Install registers with airtight connections to ducts and to allow service and maintenance of dampers, air extractors, and fire dampers.

3.3 ADJUSTING
A. After installation, adjust registers and grilles to air patterns indicated, or as directed, before starting air balancing.

END OF SECTION 233713.23
355
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 1
SECTION 235416.13 - GAS-FIRED FURNACES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Gas-fired, condensing furnaces and accessories complete with controls.

2. Refrigeration components.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include rated capacities, operating characteristics, furnished specialties, and accessories.

B. Shop Drawings:

1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

2. Include diagrams for power, signal, and control wiring.

1.4 INFORMATIONAL SUBMITTALS
A. Sample Warranty: For special warranty.

1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For each furnace to include in emergency, operation, and maintenance manuals.

1. In addition to items specified in Section 017823 "Operation and Maintenance Data," include the following:
a. Furnace and accessories complete with controls.
b. Air filter.
c. Refrigeration components.
356
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 2

1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Disposable Air Filters: Furnish four (4) complete sets.

1.7 QUALITY ASSURANCE
A. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup."
B. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."
C. Comply with NFPA 70.

1.8 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace the following components of furnaces that fail in materials or workmanship within specified warranty period:

1. Warranty Period, Commencing on Date of Substantial Completion:
a. Furnace Heat Exchanger: 20 years.
b. Integrated Ignition and Blower Control Circuit Board: Five years.

PART 2 - PRODUCTS

2.1 ASSEMBLY DESCRIPTION
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a qualified testing agency, and marked for intended location and application.

B. General Requirements for Noncondensing Gas-Fired Furnaces: Factory assembled, piped, wired, and tested; complying with ANSI Z21.47/CSA 2.3 and NFPA 54.

2.2 GAS-FIRED FURNACES, CONDENSING
A. Lennox model SL297UHNV or approved equal
B. Cabinet: Steel.

1. Cabinet interior around heat exchanger shall be factory-installed insulation.

2. Lift-out panels shall expose burners and all other items requiring access for maintenance.

3. Factory paint external cabinets in manufacturer's standard color. 357
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 3

4. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

C. Blower: factory balanced, resilient mounted, variable speed direct drive.

1. Special Motor Features, ECM: Electronically controlled motor (ECM) controlled by integrated furnace/blower control.

D. Type of Gas: Natural.

E. Heat Exchanger:

1. Primary: Aluminized steel.

2. Secondary: Stainless steel.

F. Burner:

1. Gas Valve: 100 percent safety modulating main gas valve, main shutoff valve, pressure regulator, safety pilot with electronic flame sensor, limit control, transformer, and combination ignition/fan timer control board.

2. Ignition: Electric pilot ignition, with hot-surface igniter or electric spark ignition.

G. Gas-Burner Safety Controls:

1. Electronic Flame Sensor: Prevents gas valve from opening until pilot flame is proven; stops gas flow on ignition failure.

2. Flame Rollout Switch: Installed on burner box; prevents burner operation.

3. Limit Control: Fixed stop at maximum permissible setting; de-energizes burner on excessive bonnet temperature; automatic reset.

H. Combustion-Air Inducer: Centrifugal fan with thermally protected motor and sleeve bearings prepurges heat exchanger and vents combustion products; pressure switch prevents furnace operation if combustion-air inlet or flue outlet is blocked.

I. Furnace Controls: Solid-state board integrates ignition, heat, cooling, and fan speeds; adjustable fan-on and fan-off timing; terminals for connection to accessories.

J. Accessories:

1. Combination Combustion-Air Intake and Vent: PVC plastic fitting to combine combustion-air inlet and vent through outside wall.

2. CPVC Plastic Vent Materials:
a. CPVC Plastic Pipe: Schedule 40, complying with ASTM F441/F441M. b. CPVC Plastic Fittings: Schedule 40, complying with ASTM F438, socket type. c. CPVC Solvent Cement: ASTM F493.

3. PVC Plastic Vent Materials:
a. PVC Plastic Pipe: Schedule 40, complying with ASTM D1785. b. PVC Plastic Fittings: Schedule 40, complying with ASTM D2466, socket type. c. PVC Solvent Cement: ASTM D2564.
358
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 4
K. Capacities and Characteristics:

1. Airflow Configuration: Upflow.

2. Gas:
a. Type: Natural.
b. Minimum Efficiency AFUE: 97.5 percent.
c. Input: 80 MBh.
d. Heat Output: 78 MBh.
e. Gas Connection Size: 1/2 NPS.
f. Combustion-Air Inlet Size: 2 inches.
g. Combustion-Air Inlet Material: PVC.
h. Heat-Exchanger Condensate Drain Size: 3/4 NPS.
i. Vent Size: 2 inches.
j. Vent Material: PVC.

3. Fan:
a. Airflow: 620-1730 cfm.
b. External Static Pressure: 1 inches wg.
c. Motor:
1) Size: 3/4 hp

4. Furnace Electrical Connection:
a. Volts: 120.
b. Phase: 1.
c. Hertz: 60.
d. Full-Load Amperes: 10.1.
e. Maximum Overcurrent Protection: 15.

2.3 THERMOSTATS
A. Controls shall comply with requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air Conditioning."
B. Solid-State, Combination Thermostat and Humidistat: Wall-mounted, programmable, microprocessor-based unit with automatic switching from heating to cooling and humidifying to dehumidifying, preferential rate control, seven-day programmability with minimum of four temperature presets per day, vacation mode, and battery backup protection against power failure for program settings.

2.4 AIR FILTERS
A. Washable Filters: 1-inch- (25-mm-) thick urethane pad.

B. Disposable Filters: 2-inch- (50-mm-) thick fiberglass media with ASHRAE 52.2 MERV rating of 8 or higher, in sheet metal frame.
359
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 5
C. Charged Media Air Filters: Sheet metal housing arranged to be ducted in return-air duct connection to furnace; generates electrostatic charge; MERV 10 rating.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine factory-installed insulation before furnace installation. Reject units that are wet, moisture damaged, or mold damaged.

C. Examine roughing-in for gas and refrigerant piping systems to verify actual locations of piping connections before equipment installation.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Install gas-fired furnaces and associated fuel and vent features and systems according to NFPA 54.

B. Suspended Units: Suspend from structure using threaded rods, spring hangers, and building attachments. Secure rods to unit hanger attachments. Adjust hangers so unit is level and plumb.

1. Install seismic restraints to limit movement of furnace by resisting code-required seismic acceleration.

C. Base-Mounted Units: Secure units to substrate. Provide optional bottom closure base if required by installation conditions.

1. Anchor furnace to substrate to resist code-required seismic acceleration.

D. Controls: Install thermostats and humidistats at mounting height of 48 inches above floor.

E. Wiring Method: Install control wiring in accessible ceiling spaces and in gypsum board partitions where unenclosed wiring method may be used. Conceal control wiring except in unfinished spaces.

F. Install ground-mounted, compressor-condenser components on 6-inch-thick, reinforced concrete base; 6 inches larger on each side than unit. Concrete, reinforcement, and formwork are specified in Section 033000 "Cast-in-Place Concrete." Coordinate anchor installation with concrete base.

G. Install ground-mounted compressor-condenser components on polyethylene mounting base. 360
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 6

3.3 PIPING CONNECTIONS
A. Gas piping installation requirements are specified in Section 231123 "Facility Natural-Gas Piping." Drawings indicate general arrangement of piping, fittings, and specialties. Connect gas piping with union or flange and appliance connector valve.

B. Install piping adjacent to equipment to allow service and maintenance.

C. Vent and Outside-Air Connection, Condensing, Gas-Fired Furnaces: Connect plastic piping vent material to furnace connections and extend outdoors. Terminate vent outdoors with a cap and in an arrangement that will protect against entry of birds, insects, and dirt.

1. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

2. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

3. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
a. Comply with ASTM F402 for safe-handling practice of cleaners, primers, and solvent cements.
b. CPVC Piping: Join according to ASTM D2846/D2846M, Appendix. c. PVC Pressure Piping: Join schedule number ASTM D1785 PVC pipe and PVC socket fittings according to ASTM D2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D2855.

4. Slope pipe vent back to furnace or to outside terminal.

D. Connect refrigerant tubing kits to refrigerant coil in furnace and to air-cooled compressorcondenser unit.

1. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8/A5.8M.

E. Comply with requirements in Section 232300 "Refrigerant Piping" for installation and joint construction of refrigerant piping.

3.4 DUCTWORK CONNECTIONS
A. Connect ducts to furnace with flexible connector. Comply with requirements in Section 233300 "Air Duct Accessories."

3.5 ELECTRICAL CONNECTIONS
A. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
B. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
361
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 7
C. Install electrical devices furnished by manufacturer, but not factory mounted, according to NFPA 70 and NECA 1.

D. Install nameplate for each electrical connection, indicating electrical equipment designation and circuit number feeding connection.

1. Nameplate shall be laminated acrylic or melamine plastic signs with a black background and engraved white letters at least 1/2 inch (13 mm) high.

3.6 CONTROL CONNECTIONS
A. Install control and electrical power wiring to field-mounted control devices.

B. Connect control wiring according to Section 260523 "Control-Voltage Electrical Power Cables."

3.7 STARTUP SERVICE
A. Complete installation and startup checks according to manufacturer's written instructions and perform the following:

1. Inspect for physical damage to unit casings.

2. Verify that access doors move freely and are weathertight.

3. Clean units and inspect for construction debris.

4. Verify that all bolts and screws are tight.

5. Adjust vibration isolation and flexible connections.

6. Verify that controls are connected and operational.

B. Start unit according to manufacturer's written instructions and complete manufacturer's operational checklist.

C. Measure and record airflows.

D. Verify proper operation of capacity control device.

3.8 ADJUSTING
A. Adjust initial temperature and humidity set points.

B. Set controls, burner, and other adjustments for optimum heating performance and efficiency.

Adjust heat-distribution features, including shutters, dampers, and relays, to provide optimum heating performance and system efficiency.

3.9 CLEANING
A. After completing installation, clean furnaces internally according to manufacturer's written instructions.

B. Install new filters in each furnace within 14 days after Substantial Completion. 362
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
GAS-FIRED FURNACES 235416.13 - 8

3.10 FIELD QUALITY CONTROL
A. Perform the following tests and inspections:

1. Perform electrical test and visual and mechanical inspection.

2. Leak Test: After installation, charge systems with refrigerant and test for leaks. Repair leaks, replace lost refrigerant, and retest until no leaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation, product capability, and compliance with requirements.

4. Verify that fan wheel is rotating in the correct direction and is not vibrating or binding.

5. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

B. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.

3.11 DEMONSTRATION
A. Train Owner's maintenance personnel to adjust, operate, and maintain condensing units. Refer to Section 017900 "Demonstration and Training."
END OF SECTION 235416.13
363
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 1
SECTION 236313 - AIR-COOLED REFRIGERANT CONDENSERS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY
A. Section Includes:

1. Packaged air-cooled refrigerant condensers.

1.3 ACTION SUBMITTALS
A. Product Data: For each air-cooled refrigerant condenser.

1. Include rated capacities, operating characteristics, furnished specialties, and accessories.

2. Include equipment dimensions, weights and structural loads, required clearances, method of field assembly, components, and location and size of each field connection.

B. Shop Drawings: For air-cooled refrigerant condensers.

1. Include plans, elevations, sections, and mounting details.

2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Include diagrams for power, signal, and control wiring.

1.4 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Plans, or BIM model, drawn to scale, showing the items described in this Section, and coordinated with all building trades.

B. Seismic Qualification Data: For air-cooled refrigerant condensers, accessories, and components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

C. Field quality-control reports.
364
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 2

1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For air-cooled refrigerant condensers to include in emergency, operation, and maintenance manuals.

1.6 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Section 033000 "Cast-in-Place Concrete."
B. Coordinate location of refrigerant piping and electrical rough-ins.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Lennox
B. Source Limitations: Obtain air-cooled refrigerant condensers from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by an NRTL, and marked for intended location and application.

B. Fabricate and label refrigeration system according to ASHRAE 15 and ASHRAE 34.

C. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."
D. Seismic Performance: Air-cooled refrigerant condensers shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified and the unit will be fully operational after the seismic event."

2. Component Importance Factor: 1.0.

E. Capacities and Characteristics:

1. Heat-Rejection Capacity: 14 MBh (kW).

2. Refrigerant Pipe Connections:
a. Number of Connections: 1.
b. Liquid Pipe Size: 1/8 NPS (6 DN).
c. Suction Pipe Size: 1/2 NPS (15 DN).
365
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 3

3. Coils:
a. Number of Rows: 2.
b. Fin Spacing: 20 fins/inch (3.0 mm).

4. Fans:
a. Number of Condenser Fans: 1
b. Diameter: 22 inches (mm).
c. RPM: 825
d. Total Airflow: 3600 cfm (L/s).
e. Condenser Fan Motor Size: 1/4 hp.

5. Electrical Characteristics:
a. Watts: 310 W
b. Volts: 208/230 V
c. Phase: 3 ph
d. Hertz: 60 Hz
e. Minimum Circuit Ampacity: 18.9 A.
f. Maximum Overcurrent Protection: 20 A.

2.3 PACKAGED AIR-COOLED REFRIGERANT CONDENSERS
A. Description: Factory assembled and tested; consisting of casing, condenser coils, condenser fans and motors, and unit controls.

B. Refrigerant: R-410A

1. Tube: 5/16-inch- (8-mm-) diameter seamless copper.

2. Coil Fin: Aluminum.

3. Motors: Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements for motors.
a. Enclosure Type: Open, drip-proof (ODP).
b. Motor Sizes: Minimum size as indicated. If not indicated, large enough, so driven load will not require motor to operate in service factor range above 1.0.

C. Condenser Fans and Drives:

1. Directly driven propeller fans with galvanized-steel fan blades, for vertical air discharge; manufactured with permanently lubricated ball-bearing motors with integral current- and thermal-overload protection.

2. Fan Motors:
a. Weather-proof motors with rain shield and shaft slinger. b. Open-drip proof (ODP).
366
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 4

2.4 MATERIALS
A. Steel:

1. ASTM A36/A36M for carbon structural steel.

B. Stainless Steel:

1. Manufacturer's standard grade for casing.

2. Manufacturer's standard type, ASTM A240/A240M for bare steel exposed to airstream or moisture.

C. Galvanized Steel: ASTM A653/A653M.

D. Aluminum: ASTM B209 (ASTM B209M).

E. Corrosion-Resistant Coating: Coat with a corrosion-resistant coating capable of withstanding a 500-hour salt-spray test according to ASTM B117.

1. Standards:
a. ASTM B117 for salt spray.
b. ASTM D2794 for minimum impact resistance of 100 in-lb (11.3 N-m). c. ASTM B3359 for cross hatch adhesion of 5B.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of air-cooled refrigerant condensers.

B. Examine roughing-in for refrigerant piping systems to verify actual locations of piping connections before equipment installation.

C. Examine walls, floors, and roofs for suitable conditions where air-cooled condensers will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Install units level and plumb, firmly anchored in locations indicated; maintain manufacturer's recommended clearances.

B. Equipment Mounting:
367
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 5

1. Install air-cooled condenser refrigerant condensers on cast-in-place concrete equipment bases. Comply with requirements for equipment bases and foundations specified in Section 033000 "Cast-in-Place Concrete."

2. Comply with requirements for vibration isolation and seismic-control devices specified in Section 230548 "Vibration and Seismic Controls for HVAC." C. Maintain manufacturer's recommended clearances for service and maintenance.

D. Loose Components: Install electrical components, devices, and accessories that are not factory mounted.

3.3 PIPING CONNECTIONS
A. Piping installation requirements are specified in Section 232300 "Refrigerant Piping." Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to machine to allow service and maintenance.

C. Refrigerant Piping: Where indicated on Drawings, connect piping to unit with pressure-relief, service valve, filter-dryer, and moisture indicator on each refrigerant-circuit liquid line.

3.4 ELECTRICAL CONNECTIONS
A. Install field power to each condenser unit electrical power connection.

B. Connect wiring in accordance with Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
C. Install electrical devices furnished by manufacturer, but not factory mounted, in accordance with NFPA 70 and NECA 1.

D. Install nameplate for each electrical connection, indicating electrical equipment designation and circuit number feeding connection.

3.5 CONTROL CONNECTIONS
A. Install control and electrical power wiring to field-mounted control devices.

B. Connect control wiring in accordance with Section 260523 "Control-Voltage Electrical Power Cables."
C. Install nameplate for each control connection, indicating field control panel designation and I/O control designation feeding connection.

3.6 STARTUP SERVICE
A. Engage a factory-authorized service representative to perform startup service. 368
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
AIR-COOLED REFRIGERANT CONDENSERS 236313 - 6

1. Complete installation and startup checks according to manufacturer's written instructions and perform the following:
a. Inspect for physical damage to unit casing.
b. Verify that access doors move freely and are weathertight. c. Clean units and inspect for construction debris.
d. Verify that all bolts and screws are tight.
e. Adjust vibration isolation and flexible connections. f. Verify that controls are connected and operational.

3.7 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

B. Perform tests and inspections with the assistance of a factory-authorized service representative.

C. Tests and Inspections:

1. Perform electrical test and visual and mechanical inspection.

2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. Complete manufacturer's starting checklist.

4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

5. Verify proper airflow over coils.

D. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.

E. Air-cooled refrigerant condensers will be considered defective if they do not pass tests and inspections.

F. Prepare test and inspection reports.

3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain air-cooled refrigerant condensers.

END OF SECTION 236313
369
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT AIR COILS 238216.13 - 1
SECTION 238216.13 - REFRIGERANT AIR COILS
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Refrigerant air coils.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each air coil.

2. Include rated capacities, operating characteristics, and pressure drops for each air coil.

1.3 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Floor plans, sections, and other details, or BIM model, drawn to scale, showing the items described in this Section and coordinated with all building trades.

1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For air coils to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. ASHRAE 62.1 Compliance: Comply with applicable requirements in ASHRAE 62.1, Section 5, "Systems and Equipment," and Section 7, "Construction and Startup." B. Performance Ratings: Tested and rated in accordance with AHRI 410 and ASHRAE 33.

C. Select cooling coils for no moisture carryover at design conditions. Provide moisture eliminators on discharge face of cooling coil if necessary to eliminate moisture carryover.

D. Capacities and Characteristics:

1. Number of Rows: 3
370
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT AIR COILS 238216.13 - 2

2. Coating: Lennox, Quantum Coil

3. Air Side:
a. Static Pressure Drop: <0.2 in WC
b. Total Capacity: 60,000 Btu/h (kW).

4. Refrigerant Side:
a. Refrigerant Type: R-410A

2.2 REFRIGERANT AIR COILS
A. Lennox Quantum Coils CX35 or approved equal
B. Source Limitations: Obtain refrigerant coils from single source from single manufacturer.

C. Description: Plate fin coils constructed of staggered tubes mechanically expanded into continuous collars that are die-formed into plate fins. Coils are to be counterflow circuited and equipped with pressure-type distributors, and distributor tubes are to be of equal length, to ensure equal distribution of refrigerant to each circuit.

D. Tubes:

1. Material: Aluminum

2. Nominal Diameter: Selected for performance indicated.

3. Return Bends: 180-degree bends; material and nominal diameter to match tubes.

4. Brazing: High-temperature brazing alloy with not less than 5 percent silver.

E. Fins:

1. Type: Plate.

2. Materials:
a. Aluminum

3. Spacing: Maximum 16 fins per inch

4. Collars: Full collars for accurate fin spacing and maximum tube contact while leaving no surface of tube exposed.

5. Configuration: Laced Fins

6. Fin and Tube Joint: Silver brazed.

F. Headers:

1. Material: Aluminum

2. Tube-to-Header Connections: Tube-to-header holes to intrude inward, so landed surface area is 3 times the core tube thickness, to provide enhanced header-to-tube joint integrity.

Evenly extend tubes within the ID of the header no more than 0.12 inch (3 mm).

3. Header Top and Bottom Caps: End caps to be die-formed and installed on the ID of header, such that the landed surface area is 3 times the header wall thickness.

4. Protect openings to prevent entry of dirt into coil. 371
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT AIR COILS 238216.13 - 3
G. Holes: Include number, size, and location of holes in casing and end tube sheets required for coil installation.

H. Hardware: Use hex-head bolts, nuts, and washers constructed of Type 304stainless steel.

I. Nameplate: Aluminum or stainless steel nameplate with brass or stainless steel chain for each coil, with the following data engraved or embossed:

1. Manufacturer name, address, telephone number, and website address.

2. Manufacturer model number.

3. Serial number.

4. Manufacturing date.

5. Coil fin: Aluminum

6. Coil tube: Aluminum

7. Coil header: Aluminum

2.3 MATERIALS
A. Aluminum: ASTM B209 (ASTM B209M).

B. Galvanized Steel: ASTM A653/A653M.

C. Stainless Steel: ASTM A240/A240M.

D. Steel: ASTM A53/A53M.

2.4 SOURCE QUALITY CONTROL
A. Coils to display a tag with inspector's identification as proof of testing.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine ducts, plenums, and casings to receive air coils for compliance with requirements for installation tolerances and other conditions affecting coil performance.

B. Examine roughing-in for piping systems to verify actual locations of piping connections before coil installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Install coils level and plumb.
372
S&K Consulting Services, LLC The City of Rolling Hills
S&K No. 092226 Rolling Hills City Hall HVAC Repair
REFRIGERANT AIR COILS 238216.13 - 4
B. Install coils in metal ducts and casings constructed in accordance with SMACNA's "HVAC Duct Construction Standards, Metal and Flexible."
C. Install stainless steel drain pan under each cooling coil.

1. Construct drain pans with connection for drain; insulated and complying with ASHRAE 62.1.

2. Construct drain pans to extend beyond coil length and width and to connect to condensate trap and drainage.

3. Extend drain pan upstream and downstream from coil face.

4. Extend drain pan under coil headers and exposed supply piping.

D. Install moisture eliminators for cooling coils. Extend drain pan under moisture eliminator.

E. Straighten bent fins on air coils.

F. Clean coils using materials and methods recommended in writing by manufacturers, and clean inside of casings and enclosures to remove dust and debris.

3.3 PIPING CONNECTIONS
A. Piping installation requirements are specified in other Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to coils to allow service and maintenance.

C. Connect refrigerant piping according to Section 232300 "Refrigerant Piping." END OF SECTION 238216.13
373
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 1 SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Copper building wire.

2. Connectors and splices.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Product Schedule: Indicate type, use, location, and termination locations.

PART 2 - PRODUCTS

2.1 COPPER BUILDING WIRE
A. Description: Flexible, insulated and uninsulated, drawn copper current-carrying conductor with an overall insulation layer or jacket, or both, rated 600 V or less.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Alcan Products Corporation; Alcan Cable Division.

2. Alpha Wire.

3. Belden Inc.

4. Encore Wire Corporation.

5. General Cable Technologies Corporation.

6. Southwire Incorporated.

7. Or equal.

C. Standards:

1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

2. Conductor and Cable Marking: Comply with wire and cable marking according to UL's "Wire and Cable Marking and Application Guide."
D. Conductors: Copper, complying with ASTM B3 for bare annealed copper and with ASTM B8 for stranded conductors.
374
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 2 E. Conductor Insulation:

1. Type THHN: Comply with UL 83.

2.2 CONNECTORS AND SPLICES
A. Description: Factory-fabricated connectors, splices, and lugs of size, ampacity rating, material, type, and class for application and service indicated; listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. AFC Cable Systems, Inc.

2. Gardner Bender.

3. Hubbell Power Systems, Inc..

4. Ideal Industries, Inc..

5. Ilsco; a branch of Bardes Corporation.

6. NSi Industries LLC

7. O-Z/Gedney; a brand of the EGS Electrical Group.

8. 3M; Electrical Markets Division.

9. Tyco Electronics.

10. Or equal.

C. Lugs: One piece, seamless, designed to terminate conductors specified in this Section.

1. Material: Copper.

2. Type: Two hole with standard barrels.

3. Termination: Compression.

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS
A. Feeders:

1. Copper; solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

B. Branch Circuits:

1. Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

2. Copper. Solid for No. 12 AWG and smaller; stranded for No. 10 AWG and larger. 375
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 3

3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND

WIRING METHODS
A. Exposed Branch Circuits, Including in Crawlspaces: Type THHN/THWN-2, single conductors in raceway.

B. Branch Circuits Concealed in Ceilings, Walls, and Partitions: Type THHN/THWN-2, single conductors in raceway.

3.3 INSTALLATION, GENERAL
A. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated.

B. Complete raceway installation between conductor and cable termination points according to Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.

C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

E. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

F. Support cables according to Section 260529 "Hangers and Supports for Electrical Systems."

3.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torquetightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.

B. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.

C. Wiring at Outlets: Install conductor at each outlet, with at least 6 inch (150 mm) of slack.

3.5 IDENTIFICATION
A. Identify and color-code conductors and cables according to Section 260553 "Identification for Electrical Systems."
B. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor.
376
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519 - 4

3.6 FIRESTOPPING
A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly according to Section 078413 "Penetration Firestopping."

3.7 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. After installing conductors and cables and before electrical circuitry has been energized, test service entrance and feeder conductors for compliance with requirements.

2. Perform each of the following visual and electrical tests:
a. Inspect exposed sections of conductor and cable for physical damage and correct connection according to the single-line diagram.
b. Test bolted connections for high resistance using one of the following:
1) A low-resistance ohmmeter.
2) Calibrated torque wrench.
3) Thermographic survey.
c. Inspect compression-applied connectors for correct cable match and indentation. d. Inspect for correct identification.
e. Inspect cable jacket and condition.
f. Insulation-resistance test on each conductor for ground and adjacent conductors.

Apply a potential of 500 V(dc) for 300 V rated cable and 1000 V(dc) for 600 V rated cable for a one-minute duration.
g. Continuity test on each conductor and cable.
h. Uniform resistance of parallel conductors.

B. Cables will be considered defective if they do not pass tests and inspections.

C. Prepare test and inspection reports to record the following:

1. Procedures used.

2. Results that comply with requirements.

3. Results that do not comply with requirements, and corrective action taken to achieve compliance with requirements.

END OF SECTION 260519
377
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 1
SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Category 6 balanced twisted pair cable.

2. Balanced twisted pair cable hardware.

3. Control cable.

4. Control-circuit conductors.

1.2 INFORMATIONAL SUBMITTALS
A. Source quality-control reports.

B. Field quality-control reports.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Flame Travel and Smoke Density in Plenums: As determined by testing identical products according to NFPA 262, by a qualified testing agency. Identify products for installation in plenums with appropriate markings of applicable testing agency.

1. Flame Travel Distance: 60 inch (1520 mm) or less.

2. Peak Optical Smoke Density: 0.5 or less.

3. Average Optical Smoke Density: 0.15 or less.

C. Flame Travel and Smoke Density for Riser Cables in Non-Plenum Building Spaces: As determined by testing identical products according to UL 1666.

D. Flame Travel and Smoke Density for Cables in Non-Riser Applications and Non-Plenum Building Spaces: As determined by testing identical products according to UL 1685.

2.2 CATEGORY 6 BALANCED TWISTED PAIR CABLE
A. Description: Four-pair, balanced-twisted pair cable, certified to meet transmission characteristics of Category 6 cable at frequencies up to 250 MHz. 378
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 2
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. ADC.

2. Alpha Wire Company; a division of Belden Inc.

3. Belden Inc.

4. CommScope, Inc.

5. Draka Cableteq USA.

6. Genesis Cable Products; Honeywell International, Inc.

7. Mohawk; a division of Belden Inc.

8. Nexans; Berk-Tek Products.

9. Siemon Company (The).

10. Superior Essex Inc.

11. SYSTIMAX Solutions; a CommScope, Inc. brand.

12. 3M.

13. Tyco Electronics/AMP Netconnect; Tyco International Ltd.

14. Or equal.

C. Standard: Comply with NEMA WC 66/ICEA S-116-732 and TIA-568-C.2 for Category 6 cables.

D. Conductors: 100 ohm, No. 23 AWG solid copper.

E. Shielding/Screening: Unshielded twisted pairs (UTP).

F. Cable Rating: Plenum.

G. Jacket: Yellow thermoplastic.

2.3 BALANCED TWISTED PAIR CABLE HARDWARE
A. Description: Hardware designed to connect, splice, and terminate balanced twisted pair copper communications cable.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. ADC.

2. American Technology Systems Industries, Inc.

3. Belden, Inc.

4. Dynacom Inc.

5. Hubbell Incorporated.

6. Leviton Commercial Networks Division.

7. Molex Premise Networks; a division of Molex, Inc.

8. Planduit Corp.

9. Siemon Company (The).

10. Tyco Electronics/AMP Netconnect; Tyco International Ltd.

11. Or equal.
379
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 3
C. General Requirements for Balanced Twisted Pair Cable Hardware:

1. Comply with the performance requirements of Category 6.

2. Comply with TIA-568-C.2, IDC type, with modules designed for punch-down caps or tools.

3. Cables must be terminated with connecting hardware of same category or higher.

D. Source Limitations: Obtain balanced twisted pair cable hardware from single source from single manufacturer.

E. Connecting Blocks: 110-style IDC for Category 6. Provide blocks for the number of cables terminated on the block, plus 25 percent spare, integral with connector bodies, including plugs and jacks where indicated.

F. Cross-Connect: Modular array of connecting blocks arranged to terminate building cables and permit interconnection between cables.

1. Number of Terminals per Field: One for each conductor in assigned cables.

G. Patch Panel: Modular panels housing numbered jack units with IDC-type connectors at each jack location for permanent termination of pair groups of installed cables.

1. Features:
a. Universal T568A and T568B wiring labels.
b. Labeling areas adjacent to conductors.
c. Replaceable connectors.
d. 24 or 48 ports.

2. Construction: 16-gauge steel and mountable on 19 inch (483 mm) equipment racks.

3. Number of Jacks per Field: One for each four-pair cable indicated.

H. Patch Cords: Factory-made, four-pair cables in 36 inch (900 mm) lengths; terminated with an eight-position modular plug at each end.

1. Patch cords must have bend-relief-compliant boots and color-coded icons to ensure performance. Patch cords must have latch guards to protect against snagging.

I. Plugs and Plug Assemblies:

1. Male; eight position; color-coded modular telecommunications connector designed for termination of a single four-pair 100 ohm unshielded or shielded balanced twisted pair cable.

2. Comply with IEC 60603-7-1, IEC 60603-7-2, IEC 60603-7-3, IEC 60603-7-4, and IEC 60603-7.5.

3. Marked to indicate transmission performance.

J. Jacks and Jack Assemblies:
380
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 4

1. Female; eight position; modular; fixed telecommunications connector designed for termination of a single four-pair 100 ohm unshielded or shielded balanced twisted pair cable.

2. Designed to snap-in to a patch panel or faceplate.

3. Standards:
a. Category 6, unshielded balanced twisted pair cable must comply with IEC 60603- 7-4.
b. Category 6, unshielded balanced twisted pair cable must comply with IEC 60603- 7-4.

K. Faceplate:

1. Two port, vertical single-gang faceplates designed to mount to single-gang wall boxes.

2. Plastic Faceplate: High-impact plastic. Coordinate color with Section 262726 "Wiring Devices."

3. For use with snap-in jacks accommodating any combination of balanced twisted pair, optical fiber, and coaxial work area cords.
a. Flush mounting jacks, positioning the cord at a 45-degree angle.

L. Legend:

1. Machine printed, in the field, using adhesive-tape label.

2. Snap-in, clear-label covers and machine-printed paper inserts.

2.4 CONTROL CABLE
A. Paired Cable: NFPA 70, Type CMG.

1. One Multi-pair, twisted, No. 16 AWG, stranded (19x29) tinned-copper conductors.

2. PVC insulation.

3. Unshielded.

4. PVC jacket.

5. Flame Resistance: Comply with UL 1685.

B. Plenum-Rated, Paired Cable: NFPA 70, Type CMP.

1. One Multi-pair, twisted, No. 16 AWG, stranded (19x29) tinned-copper conductors.

2. PVC insulation.

3. Unshielded.

4. PVC jacket.

5. Flame Resistance: Comply with NFPA 262.

2.5 CONTROL-CIRCUIT CONDUCTORS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
381
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 5

1. Encore Wire Corporation.

2. General Cable Technologies Corporation.

3. Southwire Company.

4. Or equal.

B. Class 1 Control Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

C. Class 2 Control Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

D. Class 3 Remote-Control and Signal Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

E. Class 2 Control Circuits and Class 3 Remote-Control and Signal Circuits That Supply Critical Circuits: Circuit Integrity (CI) cable.

1. Smoke control signaling and control circuits.

2.6 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate cables.

B. Factory test twisted pair cables according to TIA-568-C.2.

C. Cable will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Test cables on receipt at Project site.

1. Test each pair of twisted pair cable for open and short circuits.

3.2 INSTALLATION OF RACEWAYS AND BOXES
A. Comply with requirements in Section 260533 "Raceways and Boxes for Electrical Systems" for raceway selection and installation requirements for boxes, conduits, and wireways as supplemented or modified in this Section.

1. Outlet boxes must be no smaller than 2 inch (50 mm) wide, 3 inch (75 mm) high, and 2- 1/2 inch (64 mm) deep.

2. Flexible metal conduit must not be used.
382
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 6
B. Comply with TIA-569-D for pull-box sizing and length of conduit and number of bends between pull points.

C. Install manufactured conduit sweeps and long-radius elbows if possible.

3.3 INSTALLATION OF CONDUCTORS AND CABLES
A. Comply with NECA 1.

B. General Requirements for Cabling:

1. Comply with TIA-568-C Series of standards.

2. Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems."

3. Terminate all conductors; cable must not contain unterminated elements. Make terminations only at indicated outlets, terminals, and cross-connect and patch panels.

4. Cables may not be spliced and must be continuous from terminal to terminal. Do not splice cable between termination, tap, or junction points.

5. Cables serving a common system may be grouped in a common raceway. Install network cabling and control wiring and cable in separate raceway from power wiring. Do not group conductors from different systems or different voltages.

6. Secure and support cables at intervals not exceeding 30 inch (760 mm) and not more than 6 inch (150 mm) from cabinets, boxes, fittings, outlets, racks, frames, and terminals.

7. Bundle, lace, and train conductors to terminal points without exceeding manufacturer's limitations on bending radii, but not less than radii specified in BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems." Install lacing bars and distribution spools.

8. Do not install bruised, kinked, scored, deformed, or abraded cable. Remove and discard cable if damaged during installation and replace it with new cable.

9. Cold-Weather Installation: Bring cable to room temperature before dereeling. Do not use heat lamps for heating.

10. Pulling Cable: Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems." Monitor cable pull tensions.

11. Support: Do not allow cables to lie on removable ceiling tiles.

12. Secure: Fasten securely in place with hardware specifically designed and installed so as to not damage cables.

13. Provide strain relief.

14. Keep runs short. Allow extra length for connecting to terminals. Do not bend cables in a radius less than 10 times the cable OD. Use sleeves or grommets to protect cables from vibration at points where they pass around sharp corners and through penetrations.

15. Ground wire must be copper, and grounding methods must comply with IEEE C2.

Demonstrate ground resistance.

C. Balanced Twisted Pair Cable Installation:

1. Comply with TIA-568-C.2.

2. Install termination hardware as specified in Section 271513 "Communications Copper Horizontal Cabling" unless otherwise indicated.

3. Do not untwist balanced twisted pair cables more than 1/2 inch (12 mm) at the point of termination to maintain cable geometry.
383
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 7
D. Installation of Control-Circuit Conductors:

1. Install wiring in raceways.

2. Use insulated spade lugs for wire and cable connection to screw terminals.

3. Comply with requirements specified in Section 260533 "Raceways and Boxes for Electrical Systems."
E. Open-Cable Installation:

1. Install cabling with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment.

2. Suspend copper cable not in a wireway or pathway a minimum of 8 inch (200 mm) above ceilings by cable supports not more than 30 inch (760 mm) apart.

3. Cable must not be run through or on structural members or in contact with pipes, ducts, or other potentially damaging items. Do not run cables between structural members and corrugated panels.

F. Installation of Cable Routed Exposed under Raised Floors:

1. Install plenum-rated cable only.

2. Install cabling after the flooring system has been installed in raised floor areas.

3. Below each feed point, neatly coil a minimum of 72 inch (1830 mm) of cable in a coil not less than 12 inch (305 mm) in diameter.

3.4 REMOVAL OF CONDUCTORS AND CABLES
A. Remove abandoned conductors and cables. Abandoned conductors and cables are those installed that are not terminated at equipment and are not identified with a tag for future use.

3.5 CONTROL-CIRCUIT CONDUCTORS
A. Minimum Conductor Sizes:

1. Class 1 remote-control and signal circuits; No 14 AWG.

2. Class 2 low-energy, remote-control, and signal circuits; No. 16 AWG.

3. Class 3 low-energy, remote-control, alarm, and signal circuits; No 12 AWG.

3.6 FIRESTOPPING
A. Comply with requirements in Section 078413 "Penetration Firestopping." B. Comply with TIA-569-D, Annex A, "Firestopping."
C. Comply with BICSI TDMM, "Firestopping" Chapter.
384
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
CONTROL-VOLTAGE ELECTRICAL POWER CABLES 260523 - 8

3.7 GROUNDING
A. For control-voltage wiring and cabling, comply with requirements in Section 260526 "Grounding and Bonding for Electrical Systems."

3.8 IDENTIFICATION
A. Comply with requirements for identification specified in Section 260553 "Identification for Electrical Systems."
B. Identify data and communications system components, wiring, and cabling according to TIA606-B; label printers must use label stocks, laminating adhesives, and inks complying with UL 969.

C. Identify each wire on each end and at each terminal with a number-coded identification tag.

Each wire must have a unique tag.

3.9 FIELD QUALITY CONTROL
A. Tests and Inspections:

1. Visually inspect cable jacket materials for UL or third-party certification markings.

Inspect cabling terminations to confirm color-coding for pin assignments, and inspect cabling connections to confirm compliance with TIA-568-C.1.

2. Visually inspect cable placement, cable termination, grounding and bonding, equipment and patch cords, and labeling of all components.

3. Test cabling for direct-current loop resistance, shorts, opens, intermittent faults, and polarity between conductors. Test operation of shorting bars in connection blocks. Test cables after termination, but not after cross-connection. a. Test instruments must meet or exceed applicable requirements in TIA-568-C.2.

Perform tests with a tester that complies with performance requirements in its "Test Instruments (Normative)" Annex, complying with measurement accuracy specified in its "Measurement Accuracy (Informative)" Annex. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.

B. Document data for each measurement. Print data for submittals in a summary report that is formatted using Table 10.1 in BICSI TDMM as a guide, or transfer the data from the instrument to the computer, save as text files, print, and submit.

C. End-to-end cabling will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

END OF SECTION 260523
385
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 1
SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Support, anchorage, and attachment components.

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for the following:
a. Slotted support systems, hardware, and accessories.
b. Clamps.
c. Hangers.
d. Sockets.
e. Eye nuts.
f. Fasteners.
g. Anchors.
h. Saddles.
i. Brackets.

2. Include rated capacities and furnished specialties and accessories.

B. Shop Drawings: Signed and sealed by a qualified professional engineer. For fabrication and installation details for electrical hangers and support systems.

1. Hangers. Include product data for components.

2. Slotted support systems.

3. Equipment supports.

1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.

PART 2 - PRODUCTS

2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS
386
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 2
A. Steel Slotted Support Systems: Preformed steel channels and angles with minimum 13/32 inch (10 mm) diameter holes at a maximum of 8 inch (200 mm) on center in at least one surface.

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Allied Tube & Conduit.
b. Cooper B-Line, Inc.
c. ERICO International Corporation.
d. GS Metals Corp.
e. Thomas & Betts Corporation.
f. Unistrut; Atkore International.
g. Wesanco, Inc.
h. Or equal.

3. Standard: Comply with MFMA-4 factory-fabricated components for field assembly.

4. Material for Channel, Fittings, and Accessories: Stainless steel, Type 304.

5. Channel Width: 1-1/4 inch (31.75 mm).

6. Metallic Coatings: Hot-dip galvanized after fabrication and applied according to MFMA4.

7. Painted Coatings: Manufacturer's standard painted coating applied according to MFMAbelow if retaining "Nonmetallic Coatings" or "Painted Coatings" Subparagraph above.

8. Protect finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

B. Conduit and Cable Support Devices: Stainless steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported.

C. Support for Conductors in Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug or plugs for nonarmored electrical conductors or cables in riser conduits. Plugs must have number, size, and shape of conductor gripping pieces as required to suit individual conductors or cables supported. Body must be made of malleable iron.

D. Structural Steel for Fabricated Supports and Restraints: ASTM A36/A36M steel plates, shapes, and bars; black and galvanized.

E. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following:

1. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, steel, or wood, with tension, shear, and pullout capacities appropriate for supported loads and building materials where used.
a. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
387
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 3
b. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1) Hilti, Inc.
2) ITW Ramset/Red Head; Illinois Tool Works, Inc.
3) MKT Fastening, LLC.
4) Simpson Strong-Tie Co., Inc.
5) Or equal.

2. Mechanical-Expansion Anchors: Insert-wedge-type, stainless steel, for use in hardened portland cement concrete, with tension, shear, and pullout capacities appropriate for supported loads and building materials where used.
a. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
b. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1) Cooper B-Line, Inc.
2) Empire Tool and Manufacturing Co., Inc.
3) Hilti, Inc.
4) ITW Ramset/Red Head; Illinois Tool Works, Inc.
5) MKT Fastening, LLC.
6) Or equal.

3. Concrete Inserts: Steel or malleable-iron, slotted support system units are similar to MSS Type 18 units and comply with MFMA-4 or MSS SP-58.

4. Clamps for Attachment to Steel Structural Elements: MSS SP-58 units are suitable for attached structural element.

5. Through Bolts: Structural type, hex head, and high strength. Comply with ASTM F3125/F3125M, Grade A325 (Grade A325M).

6. Toggle Bolts: All steel springhead type.

7. Hanger Rods: Threaded steel.

PART 3 - EXECUTION

3.1 SELECTION
A. Comply with the following standards for selection and installation of hangers and supports, except where requirements on Drawings or in this Section are stricter:

1. NECA NEIS 101
B. Comply with requirements for raceways and boxes specified in Section 260533 "Raceway and Boxes for Electrical Systems."
C. Maximum Support Spacing and Minimum Hanger Rod Size for Raceways: Space supports for 388
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 4
EMT, IMC, and ERMC as scheduled in NECA NEIS 1, where its Table 1 lists maximum spacings that are less than those stated in NFPA 70. Minimum rod size must be 1/4 inch (6 mm) in diameter.

D. Spring-steel clamps designed for supporting single conduits without bolts may be used for 1- 1/2 inch (38 mm) and smaller raceways serving branch circuits and communication systems above suspended ceilings, and for fastening raceways to trapeze supports.

3.2 INSTALLATION OF SUPPORTS
A. Comply with NECA NEIS 101 for installation requirements except as specified in this article.

B. Raceway Support Methods: In addition to methods described in NECA NEIS 1, EMT and ERMC may be supported by openings through structure members, in accordance with NFPA 70.

C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits.

Minimum static design load used for strength determination must be weight of supported components plus 200 lb (90 kg).

D. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to building structural elements by the following methods unless otherwise indicated by code:

1. To Wood: Fasten with lag screws or through bolts.

2. To New Concrete: Bolt to concrete inserts.

3. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.

4. To Existing Concrete: Expansion anchor fasteners.

5. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete 4 inch (100 mm) thick or greater. Do not use for anchorage to lightweight-aggregate concrete or for slabs less than 4 inch (100 mm) thick.

6. To Steel: Beam clamps (MSS SP-58, Type 19, 21, 23, 25, or 27), complying with MSS SP-69.

7. To Light Steel: Sheet metal screws.

8. Items Mounted on Hollow Walls and Nonstructural Building Surfaces: Mount cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices on slotted-channel racks attached to substrate by means that comply with seismic-restraint strength and anchorage requirements.

E. Drill holes for expansion anchors in concrete at locations and to depths that avoid the need for reinforcing bars.

3.3 PAINTING
A. Touchup:
389
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529 - 5

1. Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces. a. Apply paint by brush or spray to provide minimum dry film thickness of 2.0 mils (0.05 mm).

B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A780.

END OF SECTION 260529
390
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-1
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Metal conduits, tubing, and fittings.

2. Boxes, enclosures, and cabinets.

1.3 DEFINITIONS
A. ARC: Aluminum rigid conduit.

B. GRC: Galvanized rigid steel conduit.

C. IMC: Intermediate metal conduit.

1.4 ACTION SUBMITTALS
A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

B. Shop Drawings: Include plans, elevations, sections, and attachment details.

1.5 SHOP DRAWINGS AND INFORMATIONAL SUBMITTALS
A. Shop Drawings: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of items involved:

1. Structural members in paths of conduit groups with common supports.

2. HVAC and plumbing items and architectural features in paths of conduit groups with common supports.

B. Qualification Data: For professional engineer.

C. Seismic Qualification Certificates: For enclosures, cabinets, and conduit racks and their mounting provisions, including those for internal components, from manufacturer. 391
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-2

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

4. Detailed description of conduit support devices and interconnections on which the certification is based and their installation requirements.

D. Source quality-control reports.

PART 2 - PRODUCTS

2.1 METAL CONDUITS, TUBING, AND FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. AFC Cable Systems, Inc.

2. Allied Tube & Conduit.

3. Anamet Electrical, Inc.

4. Electri-Flex Company.

5. O-Z/Gedney.

6. Picoma Industries.

7. Republic Conduit.

8. Robroy Industries.

9. Southwire Company.

10. Thomas & Betts Corporation.

11. Western Tube and Conduit Corporation.

12. Wheatland Tube Company.

13. Or equal.

B. Listing and Labeling: Metal conduits, tubing, and fittings shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. GRC: Comply with ANSI C80.1 and UL 6.

D. ARC: Not allowed.

E. IMC: Comply with ANSI C80.6 and UL 1242.

F. PVC-Coated Steel Conduit: PVC-coated rigid steel conduit.

1. Comply with NEMA RN 1.

2. Coating Thickness: 0.040 inch (1 mm), minimum.

G. EMT: Comply with ANSI C80.3 and UL 797.
392
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-3
H. LFMC: Flexible steel conduit with PVC jacket and complying with UL 360.

I. Fittings for Metal Conduit: Comply with NEMA FB 1 and UL 514B.

1. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 886 and NFPA 70.

2. Fittings for EMT:
a. Material: Steel.
b. Type: Setscrew.

3. Expansion Fittings: PVC or steel to match conduit type, complying with UL 651, rated for environmental conditions where installed, and including flexible external bonding jumper.

4. Coating for Fittings for PVC-Coated Conduit: Minimum thickness of 0.040 inch (1 mm), with overlapping sleeves protecting threaded joints.

J. Joint Compound for IMC, GRC, or ARC: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity.

2.2 BOXES, ENCLOSURES, AND CABINETS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Adalet.

2. Cooper Technologies Company; Cooper Crouse-Hinds.

3. EGS/Appleton Electric.

4. Erickson Electrical Equipment Company.

5. FSR Inc.

6. Hoffman.

7. Hubbell Incorporated.

8. Kraloy.

9. Milbank Manufacturing Co.

10. Mono-Systems, Inc.

11. O-Z/Gedney.

12. RACO; Hubbell.

13. Robroy Industries.

14. Spring City Electrical Manufacturing Company.

15. Stahlin Non-Metallic Enclosures.

16. Thomas & Betts Corporation.

17. Wiremold / Legrand.

18. Or equal.

B. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets installed in wet locations shall be listed for use in wet locations.

C. Sheet Metal Outlet and Device Boxes: Comply with NEMA OS 1 and UL 514A. 393
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-4
D. Cast-Metal Outlet and Device Boxes: Comply with NEMA FB 1, ferrous alloy, Type FD, with gasketed cover.

E. Nonmetallic Outlet and Device Boxes: Comply with NEMA OS 2 and UL 514C.

F. Luminaire Outlet Boxes: Nonadjustable, designed for attachment of luminaire weighing 50 lb (23 kg). Outlet boxes designed for attachment of luminaires weighing more than 50 lb (23 kg) shall be listed and marked for the maximum allowable weight.

G. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.

H. Cast-Metal Access, Pull, and Junction Boxes: Comply with NEMA FB 1 and UL 1773, galvanized, cast iron with gasketed cover.

I. Box extensions used to accommodate new building finishes shall be of same material as recessed box.

J. Device Box Dimensions: 4 inches square by 2-1/8 inches deep (100 mm square by 60 mm deep).

K. Gangable boxes are prohibited.

L. Hinged-Cover Enclosures: Comply with UL 50 and NEMA 250, Type 1, with continuous-hinge cover with flush latch unless otherwise indicated.

1. Metal Enclosures: Steel, finished inside and out with manufacturer's standard enamel.

2. Nonmetallic Enclosures: Plastic.

3. Interior Panels: Steel; all sides finished with manufacturer's standard enamel.

M. Cabinets:

1. NEMA 250, Type 1 galvanized-steel box with removable interior panel and removable front, finished inside and out with manufacturer's standard enamel.

2. Hinged door in front cover with flush latch and concealed hinge.

3. Key latch to match panelboards.

4. Metal barriers to separate wiring of different systems and voltage.

5. Accessory feet where required for freestanding equipment.

6. Nonmetallic cabinets shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

PART 3 - EXECUTION

3.1 RACEWAY APPLICATION
A. Outdoors: Apply raceway products as specified below unless otherwise indicated:

1. Exposed Conduit: GRC.

2. Concealed Conduit, Aboveground: EMT.
394
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-5

3. Underground Conduit: RNC,Type EPC-40-PVC.

4. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): LFMC.

5. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R.

B. Indoors: Apply raceway products as specified below unless otherwise indicated:

1. Exposed, Not Subject to Physical Damage: RNC.

2. Exposed, Not Subject to Severe Physical Damage: EMT

3. Exposed and Subject to Severe Physical Damage: GRC. Raceway locations include the following:
a. Loading dock.
b. Corridors used for traffic of mechanized carts, forklifts, and pallet-handling units. c. Mechanical rooms.
d. Gymnasiums.

4. Concealed in Ceilings and Interior Walls and Partitions: EMT

5. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): FMC, except use LFMC in damp or wet locations.

6. Damp or Wet Locations: GRC.

7. Boxes and Enclosures: NEMA 250, Type 1, except use NEMA 250, Type 4 stainless steel in institutional and commercial kitchens and damp or wet locations.

C. Minimum Raceway Size: 3/4-inch (21-mm) trade size.

D. Raceway Fittings: Compatible with raceways and suitable for use and location.

1. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated. Comply with NEMA FB 2.10.

2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings listed for use with this type of conduit. Patch and seal all joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Use sealant recommended by fitting manufacturer and apply in thickness and number of coats recommended by manufacturer.

3. EMT: Use setscrew, steel fittings. Comply with NEMA FB 2.10.

4. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with NEMA FB 2.20.

E. Install nonferrous conduit or tubing for circuits operating above 60 Hz. Where aluminum raceways are installed for such circuits and pass through concrete, install in nonmetallic sleeve.

F. Do not install aluminum conduits, boxes, or fittings in contact with concrete or earth.

G. Install surface raceways only where indicated on Drawings.

3.2 INSTALLATION
A. Comply with NECA 1 and NECA 101 for installation requirements except where requirements 395
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-6
on Drawings or in this article are stricter. Comply with NECA 102 for aluminum conduits.

Comply with NFPA 70 limitations for types of raceways allowed in specific occupancies and number of floors.

B. Keep raceways at least 6 inches (150 mm) away from parallel runs of flues and steam or hotwater pipes. Install horizontal raceway runs above water and steam piping.

C. Complete raceway installation before starting conductor installation.

D. Comply with requirements in Section 260529 "Hangers and Supports for Electrical Systems" for hangers and supports.

E. Install no more than the equivalent of three 90-degree bends in any conduit run except for control wiring conduits, for which fewer bends are allowed. Support within 12 inches (300 mm) of changes in direction.

F. Conceal conduit and EMT within finished walls, ceilings, and floors unless otherwise indicated.

Install conduits parallel or perpendicular to building lines.

G. Support conduit within 12 inches (300 mm) of enclosures to which attached.

H. Stub-ups to Above Recessed Ceilings:

1. Use EMT, IMC, or RMC for raceways.

2. Use a conduit bushing or insulated fitting to terminate stub-ups not terminated in hubs or in an enclosure.

I. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound to threads of raceway and fittings before making up joints. Follow compound manufacturer's written instructions.

J. Raceway Terminations at Locations Subject to Moisture or Vibration: Use insulating bushings to protect conductors including conductors smaller than No. 4 AWG.

K. Terminate threaded conduits into threaded hubs or with locknuts on inside and outside of boxes or cabinets. Install bushings on conduits up to 1-1/4-inch (35mm) trade size and insulated throat metal bushings on 1-1/2-inch (41-mm) trade size and larger conduits terminated with locknuts.

Install insulated throat metal grounding bushings on service conduits.

L. Install raceways square to the enclosure and terminate at enclosures with locknuts. Install locknuts hand tight plus 1/4 turn more.

M. Do not rely on locknuts to penetrate nonconductive coatings on enclosures. Remove coatings in the locknut area prior to assembling conduit to enclosure to assure a continuous ground path.

N. Cut conduit perpendicular to the length. For conduits 2-inch (53-mm) trade size and larger, use roll cutter or a guide to make cut straight and perpendicular to the length.

O. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than 200-lb (90-kg) tensile strength. Leave at least 12 inches (300 mm) of slack at each end 396
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-7
of pull wire. Cap underground raceways designated as spare above grade alongside raceways in use.

P. Surface Raceways:

1. Install surface raceway with a minimum 2-inch (50-mm) radius control at bend points.

2. Secure surface raceway with screws or other anchor-type devices at intervals not exceeding 48 inches (1200 mm) and with no less than two supports per straight raceway section. Support surface raceway according to manufacturer's written instructions. Tape and glue are not acceptable support methods.

Q. Install raceway sealing fittings at accessible locations according to NFPA 70 and fill them with listed sealing compound. For concealed raceways, install each fitting in a flush steel box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings according to NFPA 70.

R. Install devices to seal raceway interiors at accessible locations. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal the interior of all raceways at the following points:

1. Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces.

2. Where an underground service raceway enters a building or structure.

3. Where otherwise required by NFPA 70.

S. Comply with manufacturer's written instructions for solvent welding RNC and fittings.

T. Expansion-Joint Fittings:

1. Install in each run of aboveground RNC that is located where environmental temperature change may exceed 30 deg F (17 deg C) and that has straight-run length that exceeds 25 feet (7.6 m). Install in each run of aboveground RMC and EMT conduit that is located where environmental temperature change may exceed 100 deg F (55 deg C) and that has straight-run length that exceeds 100 feet (30 m).

2. Install type and quantity of fittings that accommodate temperature change listed for each of the following locations:
a. Outdoor Locations Not Exposed to Direct Sunlight: 125 deg F (70 deg C) temperature change.
b. Outdoor Locations Exposed to Direct Sunlight: 155 deg F (86 deg C) temperature change.
c. Indoor Spaces Connected with Outdoors without Physical Separation: 125 deg F (70 deg C) temperature change.
d. Attics: 135 deg F (75 deg C) temperature change.

3. Install fitting(s) that provide expansion and contraction for at least 0.00041 inch per foot of length of straight run per deg F (0.06 mm per meter of length of straight run per deg C) of temperature change for PVC conduits. Install fitting(s) that provide expansion and contraction for at least 0.000078 inch per foot of length of straight run per deg F (0.0115 mm per meter of length of straight run per deg C) of temperature change for 397
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-8
metal conduits.

4. Install expansion fittings at all locations where conduits cross building or structure expansion joints.

5. Install each expansion-joint fitting with position, mounting, and piston setting selected according to manufacturer's written instructions for conditions at specific location at time of installation. Install conduit supports to allow for expansion movement.

U. Flexible Conduit Connections: Comply with NEMA RV 3. Use a maximum of 72 inches (1830 mm) of flexible conduit for recessed and semirecessed luminaires, equipment subject to vibration, noise transmission, or movement; and for transformers and motors.

1. Use LFMC in damp or wet locations subject to severe physical damage.

2. Use LFMC or LFNC in damp or wet locations not subject to severe physical damage.

V. Mount boxes at heights indicated on Drawings. If mounting heights of boxes are not individually indicated, give priority to ADA requirements. Install boxes with height measured to center top bottom of box unless otherwise indicated.

W. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block, and install box flush with surface of wall. Prepare block surfaces to provide a flat surface for a raintight connection between box and cover plate or supported equipment and box.

X. Horizontally separate boxes mounted on opposite sides of walls so they are not in the same vertical channel.

Y. Locate boxes so that cover or plate will not span different building finishes.

Z. Support boxes of three gangs or more from more than one side by spanning two framing members or mounting on brackets specifically designed for the purpose.

AA. Fasten junction and pull boxes to or support from building structure. Do not support boxes by conduits.

3.3 SLEEVE AND SLEEVE-SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies.

3.4 FIRESTOPPING
A. Install firestopping at penetrations of fire-rated floor and wall assemblies.

3.5 PROTECTION
A. Protect coatings, finishes, and cabinets from damage and deterioration.

1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer.
398
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-9

2. Repair damage to PVC coatings or paint finishes with matching touchup coating recommended by manufacturer.

END OF SECTION 260533
399
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-10

THIS PAGE IS INTENTIONALLY LEFT BLANK
400
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 1
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Labels.

2. Bands and tubes.

3. Tapes and stencils.

4. Tags.

5. Signs.

6. Cable ties.

7. Miscellaneous identification products.

1.2 ACTION SUBMITTALS
A. Product Data:

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for electrical identification products.

B. Samples: For each type of label and sign to illustrate composition, size, colors, lettering style, mounting provisions, and graphic features of identification products.

C. Identification Schedule: For each piece of electrical equipment and electrical system components to be index of nomenclature for electrical equipment and system components used in identification signs and labels. Use same designations indicated on Drawings.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Comply with ASME A13.1 and IEEE C2.

B. Comply with 29 CFR 1910.144 for color identification of hazards; 29 CFR 1910.145 for danger, caution, warning, and safety instruction signs and tags; and the following:

1. Fire-protection equipment, including raceways, must be finished, painted, or suitably marked safety red.

2. Ceiling-mounted hangers, supports, cable trays, and raceways must be finished, painted, or suitably marked safety yellow where less than 7.7 ft (2.3 m) above finished floor.

C. Signs, labels, and tags required for personnel safety must comply with the following standards:
401
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 2

1. Safety Colors: NEMA Z535.1.

2. Facility Safety Signs: NEMA Z535.2.

3. Safety Symbols: NEMA Z535.3.

4. Product Safety Signs and Labels: NEMA Z535.4.

5. Safety Tags and Barricade Tapes for Temporary Hazards: NEMA Z535.5.

D. Comply with NFPA 70E requirements for arc-flash warning labels.

E. Adhesive-attached labeling materials, including label stocks, laminating adhesives, and inks used by label printers, must comply with UL 969.

F. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

2.2 COLOR AND LEGEND REQUIREMENTS
A. Raceways and Cables Carrying Circuits at 1000 V or Less:

1. Black letters on orange field.

2. Legend: Indicate voltage and system or service type.

B. Color-Coding for Phase- and Voltage-Level Identification, 1000 V or Less: Use colors listed below for ungrounded feeder and branch-circuit conductors.

1. Color must be factory applied or field applied for sizes larger than 8 AWG if authorities having jurisdiction permit.

2. Colors for 208Y/120 V Circuits:
a. Phase A: Black.
b. Phase B: Red.
c. Phase C: Blue.

3. Colors for 240 V Circuits:
a. Phase A: Black.
b. Phase B: Red.

4. Colors for 480Y/277 V Circuits:
a. Phase A: Brown.
b. Phase B: Orange.
c. Phase C: Yellow.

5. Color for Neutral: White.

6. Color for Equipment Grounds: Green.

7. Colors for Isolated Grounds: Green with two or more yellow stripes. 402
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 3
C. Raceways and Cables Carrying Circuits at More Than 1000 V:

1. Black letters on orange field.

2. Legend: "DANGER - CONCEALED HIGH VOLTAGE WIRING."
D. Warning Label Colors:

1. Identify system voltage with black letters on orange background.

E. Warning labels and signs must include, but are not limited to, the following legends:

1. Multiple Power Source Warning: "DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES."
F. Equipment Identification Labels:

1. Black letters on white field.

2.3 LABELS
A. Self-Adhesive Labels: Vinyl, thermal, transfer-printed, 3 mil (0.08 mm) thick, multicolor, weather- and UV-resistant, pressure-sensitive adhesive labels, configured for intended use and location.

1. Manufacturers:
a. Seton.
b. Brady.
c. Or equal.

2. Minimum Nominal Size:
a. 1-1/2 by 6 inch (37 by 150 mm) for raceway and conductors. b. 3-1/2 by 5 inch (76 by 127 mm) for equipment.
c. As required by authorities having jurisdiction.

2.4 CABLE TIES
A. General-Purpose Cable Ties: Fungus inert, self-extinguishing, one piece, self-locking, and Type 6/6 nylon.

1. Minimum Width: 3/16 inch (5 mm).

2. Tensile Strength at 73 deg F (23 deg C) in accordance with ASTM D638: 12,000 psi (82.7 MPa).

3. Temperature Range: Minus 40 to plus 185 deg F (Minus 40 to plus 85 deg C).

4. Color: Black, except where used for color-coding.

B. UV-Stabilized Cable Ties: Fungus inert, designed for continuous exposure to exterior sunlight, self-extinguishing, one piece, self-locking, and Type 6/6 nylon. 403
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 4

1. Minimum Width: 3/16 inch (5 mm).

2. Tensile Strength at 73 deg F (23 deg C) in accordance with ASTM D638: 12,000 psi (82.7 MPa).

3. Temperature Range: Minus 40 to plus 185 deg F (Minus 40 to plus 85 deg C).

4. Color: Black.

C. Plenum-Rated Cable Ties: Self-extinguishing, UV stabilized, one piece, and self-locking.

1. Minimum Width: 3/16 inch (5 mm).

2. Tensile Strength at 73 deg F (23 deg C) in accordance with ASTM D638: 7000 psi (48.2 MPa).

3. UL 94 Flame Rating: 94V-0.

4. Temperature Range: Minus 50 to plus 284 deg F (Minus 46 to plus 140 deg C).

5. Color: Black.

2.5 MISCELLANEOUS IDENTIFICATION PRODUCTS
A. Paint: Comply with requirements in painting Sections for paint materials and application requirements. Retain paint system applicable for surface material and location (exterior or interior).

B. Fasteners for Labels and Signs: Self-tapping, stainless steel screws or stainless steel machine screws with nuts and flat and lock washers.

PART 3 - EXECUTION

3.1 PREPARATION
A. Self-Adhesive Identification Products: Before applying electrical identification products, clean substrates of substances that could impair bond, using materials and methods recommended by manufacturer of identification product.

3.2 INSTALLATION
A. Verify and coordinate identification names, abbreviations, colors, and other features with requirements in other Sections requiring identification applications, Drawings, Shop Drawings, manufacturer's wiring diagrams, and operation and maintenance manual. Use consistent designations throughout Project.

B. Install identifying devices before installing acoustical ceilings and similar concealment.

C. Verify identity of item before installing identification products.

D. Coordinate identification with Project Drawings, manufacturer's wiring diagrams, and operation and maintenance manual.
404
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 5
E. Apply identification devices to surfaces that require finish after completing finish work.

F. Install signs with approved legend to facilitate proper identification, operation, and maintenance of electrical systems and connected items.

G. System Identification for Raceways and Cables under 1000 V: Identification must completely encircle cable or conduit. Place identification of two-color markings in contact, side by side.

1. Secure tight to surface of conductor, cable, or raceway.

H. System Identification for Raceways and Cables over 1000 V: Identification must completely encircle cable or conduit. Place adjacent identification of two-color markings in contact, side by side.

1. Secure tight to surface of conductor, cable, or raceway.

I. Auxiliary Electrical Systems Conductor Identification: Identify field-installed alarm, control, and signal connections.

J. Emergency Operating Instruction Signs: Install instruction signs with white legend on red background with minimum 3/8 inch (10 mm) high letters for emergency instructions at equipment used for power transfer.

K. Elevated Components: Increase sizes of labels, signs, and letters to those appropriate for viewing from floor.

L. Accessible Fittings for Raceways: Identify cover of junction and pull box of the following systems with wiring system legend and system voltage. System legends must be as follows:

1. "EMERGENCY POWER."

2. "POWER."

3. "UPS."
M. Self-Adhesive Labels:

1. Install unique designation label that is consistent with wiring diagrams, schedules, and operation and maintenance manual.

2. Unless otherwise indicated, provide single line of text with 1/2 inch (13 mm) high letters on 1-1/2 inch (38 mm) high label; where two lines of text are required, use labels 2 inch (50 mm) high.

N. Self-Adhesive Vinyl Tape: Secure tight to surface at location with high visibility and accessibility.

1. Field-Applied, Color-Coding Conductor Tape: Apply in half-lapped turns for minimum distance of 6 inch (150 mm) where splices or taps are made. Apply last two turns of tape with no tension to prevent possible unwinding.

O. Cable Ties: General purpose, for attaching tags, except as listed below:
405
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553 - 6

1. Outdoors: UV-stabilized nylon.

2. In Spaces Handling Environmental Air: Plenum rated.

3.3 IDENTIFICATION SCHEDULE
A. Install identification materials and devices at locations for most convenient viewing without interference with operation and maintenance of equipment. Install access doors or panels to provide view of identifying devices.

B. Identify conductors, cables, and terminals in enclosures and at junctions, terminals, pull points, and locations of high visibility. Identify by system and circuit designation.

C. Accessible Raceways and Metal-Clad Cables, 1000 V or Less, for Service, Feeder, and Branch Circuits, More Than 30 A and 120 V to Ground: Identify with self-adhesive raceway labels.

1. Locate identification at changes in direction, at penetrations of walls and floors, at 50 ft (15 m) maximum intervals in straight runs, and at 25 ft (7.6 m) maximum intervals in congested areas.

D. Accessible Fittings for Raceways and Cables within Buildings: Identify cover of junction and pull box of the following systems with self-adhesive labels containing wiring system legend and system voltage. System legends must be as follows:

1. "EMERGENCY POWER."

2. "POWER."

3. "UPS."
E. Control-Circuit Conductor Identification: For conductors and cables in pull and junction boxes, manholes, and handholes, use self-adhesive labels with conductor or cable designation, origin, and destination.

F. Control-Circuit Conductor Termination Identification: For identification at terminations, provide self-adhesive labels with conductor designation.

G. Locations of Underground Lines: Underground-line warning tape for power, lighting, communication, and control wiring and optical-fiber cable.

H. Concealed Raceways and Duct Banks, More Than 1000 V, within Buildings: Apply floor marking tape to the following finished surfaces:

1. Floor surface directly above conduits running beneath and within 12 inch (300 mm) of floor that is in contact with earth or is framed above unexcavated space.

2. Wall surfaces directly external to raceways concealed within wall.

3. Accessible surfaces of concrete envelope around raceways in vertical shafts, exposed in building, or concealed above suspended ceilings.

END OF SECTION 260553
406
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 1
SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Nonfusible switches.

2. Enclosures.

1.2 DEFINITIONS
A. GFEP: Ground-fault circuit-interrupter for equipment protection.

B. GFLS: Ground-fault circuit-interrupter for life safety.

C. SPDT: Single pole, double throw.

1.3 ACTION SUBMITTALS
A. Product Data:

1. For each type of enclosed switch, circuit breaker, accessory, and component indicated.

Include nameplate ratings, dimensioned elevations, sections, weights, and manufacturers' technical data on features, performance, electrical characteristics, ratings, accessories, and finishes.

2. Enclosure types and details for types other than UL 50E, Type 1.

3. Current and voltage ratings.

4. Short-circuit current ratings (interrupting and withstand, as appropriate).

5. Include evidence of qualified electrical testing laboratory listing for series rating of installed devices.

6. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices, accessories, and auxiliary components.

B. Shop Drawings: For enclosed switches and circuit breakers.

1. Include plans, elevations, sections, details, and attachments to other work.

2. Include wiring diagrams for power, signal, and control wiring.

C. Field Quality-Control Submittals:

1. Field quality-control reports.
407
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 2

1.4 INFORMATIONAL SUBMITTALS
A. Sample warranties.

1.5 CLOSEOUT SUBMITTALS
A. Warranty documentation.

1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Spare Parts: Furnish to Owner spare parts, for repairing enclosed switches and circuit breakers, that are packaged with protective covering for storage on-site and identified with labels describing contents. Include the following:

1. Fuses: Equal to 10 percent of quantity installed for each size and type, but no fewer than three of each size and type.

2. Fuse Pullers: Two for each size and type.

1.7 WARRANTY
A. Special Installer Extended Warranty: Installer warrants that fabricated and installed enclosed switches and circuit breakers perform in accordance with specified requirements and agrees to repair or replace components or products that fail to perform as specified within extendedwarranty period.

1. Extended-Warranty Period: Two years from date of Substantial Completion; full coverage for labor, materials, and equipment.

B. Special Manufacturer Extended Warranty: Manufacturer warrants that enclosed switches and circuit breakers perform in accordance with specified requirements and agrees to provide repair or replacement of components or products that fail to perform as specified within extendedwarranty period.

1. Extended-Warranty Period: Three years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS
A. Product Selection for Restricted Space: Drawings indicate maximum dimensions for enclosed switches and circuit breakers, including clearances between enclosures, and adjacent surfaces and other items. Comply with indicated maximum dimensions.

B. Electrical Components, Devices, and Accessories: Listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application. 408
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 3

2.2 NONFUSIBLE SWITCHES
A. Manufacturers:

1. Schneider Electric (Square D).

2. Eaton

3. GE

4. Or approved equal.

B. Type HD, Heavy Duty, Three Pole, Single Throw, 600 V(ac), 1200 A and Smaller: UL 98 and NEMA KS 1, horsepower rated, lockable handle with capability to accept three padlocks, and interlocked with cover in closed position.

C. Accessories:

1. Equipment Ground Kit: Internally mounted and labeled for copper and aluminum ground conductors.

2. Class R Fuse Kit: Provides rejection of other fuse types when Class R fuses are specified.

3. Auxiliary Contact Kit: One NO/NC (Form "C") auxiliary contact(s), arranged to activate before switch blades open. Contact rating - 24 V(ac).

4. Lugs: Compression type, suitable for number, size, and conductor material.

2.3 ENCLOSURES
A. Enclosed Switches and Circuit Breakers: UL 489, NEMA KS 1, UL 50E, and UL 50, to comply with environmental conditions at installed location.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine elements and surfaces to receive enclosed switches and circuit breakers for compliance with installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

1. Commencement of work will indicate Installer's acceptance of areas and conditions as satisfactory.

3.2 SELECTION OF ENCLOSURES
A. Outdoor Locations: UL 50E, Type 3R.

3.3 INSTALLATION
A. Comply with manufacturer's published instructions.
409
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 4
B. Special Techniques:

1. Coordinate layout and installation of switches, circuit breakers, and components with equipment served and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels.

2. Install individual wall-mounted switches and circuit breakers with tops at uniform height unless otherwise indicated.

3. Comply with mounting and anchoring requirements specified in Section 260548.16 "Seismic Controls for Electrical Systems."

4. Temporary Lifting Provisions: Remove temporary lifting of eyes, channels, and brackets and temporary blocking of moving parts from enclosures and components.

5. Install fuses in fusible devices.

3.4 IDENTIFICATION
A. Comply with requirements in Section 260553 "Identification for Electrical Systems."

1. Identify field-installed conductors, interconnecting wiring, and components; provide warning signs.

2. Label each enclosure with engraved metal or laminated-plastic nameplate.

3.5 FIELD QUALITY CONTROL
A. Field tests and inspections must be witnessed by Owner.

B. Tests and Inspections for Switches:

1. Visual and Mechanical Inspection:
a. Inspect physical and mechanical condition.
b. Inspect anchorage, alignment, grounding, and clearances. c. Verify that unit is clean.
d. Verify blade alignment, blade penetration, travel stops, and mechanical operation. e. Verify that fuse sizes and types match the Specifications and Drawings. f. Verify that each fuse has adequate mechanical support and contact integrity. g. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use low-resistance ohmmeter.
a) Compare bolted connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of lowest value. 2) Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer's published data or NETA ATS Table 100.12.
410
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 5
a) Bolt-torque levels must be in accordance with manufacturer's published data. In absence of manufacturer's published data, use NETA ATS Table 100.12.
h. Verify that operation and sequencing of interlocking systems is as described in the Specifications and shown on Drawings.
i. Verify correct phase barrier installation.
j. Verify lubrication of moving current-carrying parts and moving and sliding surfaces.

2. Electrical Tests:
a. Perform resistance measurements through bolted connections with low-resistance ohmmeter. Compare bolted connection resistance values to values of similar connections. Investigate values that deviate from adjacent poles or similar switches by more than 50 percent of lowest value.
b. Measure contact resistance across each switchblade fuseholder. Drop values may not exceed high level of manufacturer's published data. If manufacturer's published data are not available, investigate values that deviate from adjacent poles or similar switches by more than 50 percent of lowest value.
c. Perform insulation-resistance tests for one minute on each pole, phase-to-phase and phase-to-ground with switch closed, and across each open pole. Apply voltage in accordance with manufacturer's published data. In absence of manufacturer's published data, use Table 100.1 from NETA ATS. Investigate values of insulation resistance less than those published in Table 100.1 or as recommended in manufacturer's published data.
d. Measure fuse resistance. Investigate fuse-resistance values that deviate from each other by more than 15 percent.
e. Perform ground fault test in accordance with NETA ATS Section 7.14 "Ground Fault Protection Systems, Low-Voltage."

3. Test and adjust controls, remote monitoring, and safeties.

C. Nonconforming Work:

1. Enclosed switches and circuit breakers will be considered defective if they do not pass tests and inspections.

2. Remove and replace defective units and retest.

D. Collect, assemble, and submit test and inspection reports.

1. Test procedures used.

2. Include identification of each enclosed switch and circuit breaker tested and describe test results.

3. List deficiencies detected, remedial action taken, and observations after remedial action. 411
J.C. Chang & Associates, Inc. Rolling Hills City Hall
JCCA No. 22980-1 HVAC Repair
ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816 - 6

3.6 ADJUSTING
A. Adjust moving parts and operable components to function smoothly, and lubricate as recommended by manufacturer.

3.7 PROTECTION
A. After installation, protect enclosed switches and circuit breakers from construction activities.

Remove and replace items that are contaminated, defaced, damaged, or otherwise caused to be unfit for use prior to acceptance by Owner.

END OF SECTION 262816
412
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\01 title\t0.01 title sheet.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" TITLE SHEET T0.01 ROLLING HILLS CITY HALL HVAC REPAIR THE CITY OF ROLLING HILLS, CITY HALL 2 PORTUGUESE BEND RD, ROLLING HILLS, CA 90274 APN. 7569003904 PROJECT NO. 092226 PROJECT DIRECTORY SHEET INDEX NO. DESCRIPTION REV DATE TITLE T0.01 TITLE SHEET 1 12/28/22 T0.02 HAZARDOUS MATERIAL NOTES 1 12/28/22 MECHANICAL M0.01 MECHANICAL GENERAL NOTES M0.02 MECHANICAL SCHEDULES M0.03 TITLE 24 MANDATORY MEASURES M0.04 TITLE 24 CERTIFICATE OF COMPLIANCE M0.05 TITLE 24 CERTIFICATE OF COMPLIANCE M1.01 MECHANICAL DEMOLITION FLOOR PLAN M1.02 EXISTING CONDITIONS PHOTOGRAPHS M2.01 MECHANICAL NEW WORK FLOOR PLAN M3.01 ENLARGED MECHANICAL FLOOR PLAN & SECTIONS M4.01 MECHANICAL DETAILS M5.01 HVAC SCHEMATIC & CONTROLS ELECTRICAL E0.01 ELECTRICAL GENERAL NOTES E0.02 ELECTRICAL PANEL SCHEDULE E1.01 ELECTRICAL DEMOLITION FLOOR PLAN E2.01 ELECTRICAL NEW WORK FLOOR PLAN E4.01 ELECTRICAL DETAILS PROJECT SITE VICINITY MAP OWNER CITY OF ROLLING HILLS 2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ALAN PALERMO PROJECT MANAGER (310) 717-3244 [email protected] PREPARED BY S&K CONSULTING SERVICES 2233 VIA FERNANDEZ PALOS VERDES ESTATES, CA 90274 (310) 494-6910 MECHANICAL ENGINEER OF RECORD (PRIMARY) SAMUEL SIMON, PE PRINCIPAL MECHANICAL ENGINEER S&K CONSULTING SERVICES ELECTRICAL ENGINEER OF RECORD (SUBCONSULTANT) SEVAG AVANESSIAN, PE PRINCIPAL ELECTRICAL ENGINEER JC CHANG & ASSOCIATES PROJECT BACKGROUND 1. THE HVAC EQUIPMENT AT THE ROLLING HILLS CITY HALL HAS REACHED END OF LIFE. THE EXISTING SYSTEM NO LONGER COMPLIES WITH CURRENT REGULATIONS, INCLUDING SCAQMD EMISSION LIMITS. THE EXISTING DUCTING HAS BEEN DAMAGED BEYOND REPAIR AND HAS RODENT CONTAMINATION. 2. THE EXISTING EQUIPMENT INCLUDES, THREE (3) FURNACES, THREE (3) COOLING COILS, TWO (2) OUTDOOR CONDENSING UNITS, AND ONE (1) ECONOMIZER. 3. THE CITY OF ROLLING HILLS HAS REQUESTED TO REPLACE THE EXISTING SYSTEM AND REPAIR ANY DEFICIENCIES. 4. THE EXISTING BUILDING HAS ASBESTOS AND LEAD CONTAINING MATERIAL SCOPE OF WORK 1. PERFORM LEAD AND ASBESTOS ABATEMENT AS-REQUIRED 2. REPLACE EXISTING BUILDING HVAC EQUIPMENT: 3 FURNACES, 3 ECONOMIZERS, AND 3 SPLIT-SYSTEM COOLING COILS. 3. PROVIDE OUTSIDE AIR VENTILATION REQUIRED BY TITLE 24 4. RELOCATE NEW SPLIT SYSTEM OUTDOOR CONDENSING UNITS OUTSIDE ON NEW CONCRETE PAD 5. PROVIDE AND INSTALL NEW ZONE DUCT WITH INSULATION 6. REPLACE BROKEN SECTIONS OF DUCT AND INSULATION 5. REPLACE EXISTING DIFFUSERS WITH REGISTERS WITH DAMPER CONTROL REQUIRED BY CEC 6. REPLACE EXISTING THERMOSTATS WITH NEW HVAC CONTROLS THAT COMPLY WITH TITLE 24 7. PROVIDE DUCT CLEANING FOR EXISTING DUCTING 8. TEST AND AIR BALANCE SYSTEM APPLICABLE CODES 1. 2022 LOS ANGELES COUNTY BUILDING CODE (LACBC), TITLE 26 (2019 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R. & 2022 LACBC AMENDMENTS) 2. 2022 LOS ANGELES COUNTY ELECTRICAL CODE (LACEC), TITLE 27 (2019 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R. & 2022 LACEC AMENDMENTS) 4. 2022 LOS ANGELES COUNTY PLUMBING CODE (LACPC), TITLE 28 (2019 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R. & 2022 LACPC AMENDMENTS) 5. 2022 LOS ANGELES COUNTY MECHANICAL CODE (LACMC), TITLE 29 (2019 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R. & 2022 LACMC AMENDMENTS) 7. 2022 LOS ANGELES COUNTY FIRE CODE (LACFC), TITLE 32 (2019 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R. & 2022 LACFC AMENDMENTS) 8. 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R. REFERENCE SYMBOLS ### # X#.## # X#.## # X#.## # X#.## # X#.## XX## CALL-OUT SHEET NO. ELEVATION VIEW SHEET NO. SECTION VIEW SHEET NO. DETAIL VIEW SHEET NO. EXISTING KEYNOTE DEMOLITION KEYNOTE NEW WORK KEYNOTE EQUIPMENT TYPE EQUIPMENT NO. REVISION CALLOUT GRID SYMBOL GRID LINE A 1 KEYNOTE SYMBOLS EQUIPMENT TAG SHEET VIEW SYMBOLS FLOOR PLAN SYMBOLS LINE TYPES EXISTING DEMOLITION WORK NEW WORK ROLLING CITY OF ROLLING ROLLING HILLS CITY HILLS ESTATES OF CITY HILLS OF ROLLING OF CITY OFESTATES PORTUGUESE BEND RD ROLLING HILLS RD PALOS VERDES DR N 1 12/28/22 HAZARDOUS MATERIAL ADD. 1 1 1 413
RECEPTION WORK ROOM OFFICES / WORK SPACES HALL 1 CITY MANAGER BOOK KEEPER RECORDS VAULT CITY CLERK STRG 2 MEN UTILITY CLOSET WOMEN COUNCIL CHAMBER HALL 2 ARCHITECTURAL VAULT LOBBY SINK 1 ABCDEFGHIJK 2 3 4 5 6 7 8 9 10 T T Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\01 title\t0.02 hazardous material notes.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" HAZARDOUS MATERIAL NOTES T0.02 1. REFER TO SPECIFICATIONS SECTION FOR FURTHER INFORMATION AND RECOMMENDATIONS REGARDING MITIGATION OF ASBESTOS CONTAINING MATERIALS (ACM'S) AND LEAD BASED PAINT (LBP'S). 2. FURNISH ALL LABOR, MATERIALS, FACILITIES, EQUIPMENT, SERVICES, EMPLOYEE TRAINING AND TESTING, PERMITS, LICENSES AND AGREEMENTS NECESSARY TO PERFORM THE REQUIRED HAZARDOUS MATERIAL ABATEMENT, PAINT STABILIZATION, SELECTIVE DEMOLITION, STRUCTURE DEMOLITION, AND OTHER HAZARDOUS MATERIAL-RELATED CONSTRUCTION WORK OF THE PROJECT IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS, DRAWINGS, NOTATIONS, AND THE LATEST REGULATIONS FROM THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA), SAN JOAQUIN VALLEY AIR QUALITY MANAGEMENT DISTRICT, THE CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS, DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (DOSH, “CAL/OSHA”), CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH), AND ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL GOVERNMENTAL REGULATIONS. WHENEVER THERE IS A CONFLICT OR OVERLAP OF THE ABOVE REFERENCES, THE MOST STRINGENT PROVISION APPLIES. 3. THE HAZARDOUS MATERIALS AT THE SITE INCLUDE: A. ASBESTOS IS PRESENT IN EXTERIOR STUCCO, ACOUSTIC CEILING, CEILING PLASTER, WALL PLASTER, AND OTHER PLACES IDENTIFIED IN HAZARDOUS MATERIALS ASSESSMENT ATTACHED IN THE SPECIFICATIONS. B. LEAD IS PRESENT IN EGGSHELL AND GRAY STORAGE WALL PAINT (LEAD-BASED), WHITE EXTERIOR PAINT (LEAD-CONTAINING), AND OTHER PLACES IDENTIFIED IN HAZARDOUS MATERIALS ASSESSMENT ATTACHED IN THE SPECIFICATIONS. 4. SPECIFICATIONS HAVE BEEN PREPARED ON THE BASIS OF EXISTING DOCUMENTATION AND SITE INSPECTIONS. LOCATION OF ASBESTOS MATERIALS, LEAD-CONTAINING MATERIALS AND OTHER HAZARDOUS AND NON HAZARDOUS MATERIALS AND COMPONENTS TO BE REMOVED IS GENERAL IN NATURE, AND INTENDED TO PROVIDE AN “APPROXIMATE” INDICATION OF MATERIALS TO BE REMOVED AND EXISTING CONDITIONS. 5. THE SITE WILL BE AVAILABLE FOR EXAMINATION OF EXISTING CONDITIONS. THE CONTRACTOR SHALL REVIEW ALL APPLICABLE CONTRACT DOCUMENTS, VISIT THE SITE, AND VERIFY LOCATION, SIZE AND QUANTITY OF MATERIALS TO BE REMOVED PRIOR TO SUBMISSION OF BID. CHANGE ORDERS WILL NOT BE ALLOWED FOR ANY MATERIAL THAT CAN BE REASONABLY QUANTIFIED FROM PROJECT DRAWINGS OR THROUGH SITE INSPECTION. 6. THE CONTRACTOR SHALL ADHERE TO ALL ASPECTS OF THE PROJECT PLANS AND SPECIFICATIONS. REQUESTS TO DEVIATE FROM ANY ASPECT OF THE PLANS AND SPECIFICATIONS SHALL BE SUBMITTED IN WRITING TO THE OWNER FOR APPROVAL. THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FOR ANY DEVIATIONS. 7. HAZARD COMMUNICATION: THE CONTRACTOR SHALL CONFORM WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKER AND ENVIRONMENTAL PROTECTION WITH REGARD TO ALL KNOWN OR PRESUMED TOXIC OR HAZARDOUS BUILDING MATERIALS WHICH MAY BE PRESENT ON SITE AND INVOLVED IN THE CONTRACTOR'S ABATEMENT, DEMOLITION, LEAD RELATED CONSTRUCTION, CLEAN-UP OR OTHER WORK OF THE PROJECT. THE CONTRACTOR SHALL UTILIZE EQUIPMENT, METHODS AND PROCEDURES THAT MINIMIZE PRODUCTION OF ENVIRONMENTAL EXPOSURES AND HAZARDOUS WASTES TO THE EXTENT POSSIBLE. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL COSTS RESULTING FROM PRODUCTION OF SUCH WASTES AND ENVIRONMENTAL EXPOSURES AT NO ADDITIONAL COST TO THE OWNER. 8. ALL WORKERS AND THEIR SUPERVISORS SHALL BE TRAINED FOR ALL ANTICIPATED HAZARDS INCLUDING ASBESTOS, LEAD, MOLD, AND BIOLOGICAL WASTES. WORKERS AND THEIR SUPERVISORS SHALL BE APPROPRIATELY CERTIFIED FOR ASBESTOS AND LEAD WORK THROUGH CAL/OSHA AND CDPH RESPECTIVELY. ALL WORKERS ENTERING HAZARDOUS MATERIALS WORK AREAS SHALL BE TRAINED AND FITTED FOR SUITABLE RESPIRATORY PROTECTION AND SHALL BE TRAINED REGARDING THE SPECIFIC HEALTH AND SAFETY HAZARDS OF THIS SITE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL ASPECTS OF CONSTRUCTION HEALTH AND SAFETY AS REQUIRED FOR THE PERFORMANCE OF THIS WORK. 9. HAZARDOUS MATERIAL WORK, INCLUDING CONTAINMENT SET UP AND PREPARATION SHALL NOT START UNTIL THE CONTRACTOR'S HAZARDOUS MATERIALS SUBMITTALS HAVE BEEN APPROVED BY THE OWNER. 10. THE CONTRACTOR SHALL SUBMIT DETAILED HAZARDOUS DEMOLITION AND ABATEMENT SCHEDULE AND PHASING PLAN FOR APPROVAL BY THE OWNER PRIOR TO START UP OF WORK. THE CONTRACTOR SHALL UPDATE SCHEDULE WEEKLY AND WHEN ANY SCHEDULE CHANGES OCCUR OR ARE ANTICIPATED. 11. THE CONTRACTOR SHALL TAKE ALL NECESSARY PROTECTIVE MEASURES INCLUDING PROVIDING PERSONAL PROTECTIVE EQUIPMENT AND SUFFICIENT SAFETY TRAINING TO ALL PERSONNEL RELATED TO THE FOLLOWING ANTICIPATED HAZARDS: ASBESTOS, LEAD, NOISE, HEAT STRESS; ELECTRICAL (GFCI USE, LOCK OUT AND TAG OUT); FALL HAZARDS; WATER USAGE AROUND ELECTRICAL SYSTEMS, AND OTHER CONSTRUCTION HAZARDS. 12. ALL POLYETHYLENE SHEETING AND MATERIALS USED FOR CONTAINMENT AND CRITICAL BARRIERS SHALL BE FIRE RETARDANT. ALL LUMBER USED SHALL BE FIRE RATED. 13. FOLLOWING COMPLETION OF ABATEMENT AND APPROVAL OF WORK BY THE OWNER, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL REMAINING POLYETHYLENE SHEETING AS ASBESTOS OR LEAD CONTAMINATED WASTE, AS APPLICABLE TO THE WORK. 14. ALL HAZARDOUS MATERIAL WORK SHALL BE CONDUCTED IN CONFORMANCE WITH SECTIONS 01 45 33, 02 82 13, AND 02 83 33 OF THE CONTRACT DOCUMENTS. 15. THE CONTRACTOR SHALL PROVIDE AT LEAST 48 HOUR ADVANCE NOTICE, PRIOR TO CANCELING ANY WORK SHIFT, AND SHALL BE RESPONSIBLE FOR ALL RESULTING CONSULTANT COSTS IF TIMELY NOTICES NOT RECEIVED. PROVIDE AT LEAST 48 HOURS ADVANCE NOTICE PRIOR TO STARTING OR RE-STARTING HAZARDOUS MATERIALS RELATED WORK OR ABATEMENT. HAZARDOUS MATERIAL NOTES AREA OF WORK (WALL) AREA OF WORK (WALL) AREA OF WORK (WALL) AREA OF WORK (WALL) AREA OF WORK (WALL) AREA OF WORK (EXTERIOR WALL) AREA OF WORK (CEILING) AREA OF WORK (CEILING) AREA OF WORK (CEILING) AREA OF WORK (CEILING) AREA OF WORK (CEILING) 1 12/28/22 HAZARDOUS MATERIAL ADD. 1 414
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m0.01 mechanical general notes.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" MECHANICAL GENERAL NOTES M0.01 1. ALL WORK SHALL COMPLY WITH THE 2019 EDITIONS OF THE CALIFORNIA BUILDING, MECHANICAL, PLUMBING, AND OTHER APPLICABLE FEDERAL, STATE, OR LOCAL CODES AS ADOPTED AND ENFORCED BY THE LOCAL JURISDICTION. IN CASE THE PLANS SHOW MORE STRINGENT REQUIREMENTS, THE PLANS SHALL GOVERN THE DESIGN, YET NOTHING ON THE DESIGN DOCUMENTS SHALL BE INTERPRETED AS AUTHORITY TO VIOLATE CODE(S) OR REGULATION(S). 2. SUBMISSION OF BID IN CONNECTION WITH THIS WORK SHALL IMPLY THAT THE BIDDER HAS EXAMINED THE JOB SITE UNDER WHICH THE CONTRACTOR WILL BE OBLIGATED TO OPERATE UNDER THIS CONTRACT. NO EXTRA CHARGE WILL BE ALLOWED FOR FAILURE OF ANY BIDDER TO EXAMINE THE SITE PRIOR TO BID. 3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL". 4. CONTRACTOR AND SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS AT THE JOB SITE PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. THE CONSULTANTS AND OWNER SHALL IMMEDIATELY BE NOTIFIED OF ANY DISCREPANCIES. 5. THE CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL WORK PERFORMED AND ALL EQUIPMENT AND MATERIALS FURNISHED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK BY THE CITY'S REPRESENTATIVE. 6. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON THE DRAWINGS. TYPICAL DETAILS AND GENERAL NOTES ARE MINIMUM REQUIREMENTS TO BE USED WHEN CONDITIONS ARE NOT SHOWN OTHERWISE. 7. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR ON PROJECT. 8. IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON DESIGN PLANS WITH CODE REQUIREMENTS, THE MORE STRINGENT STANDARD SHALL PREVAIL. 9. CONTRACTOR SHALL FURNISH LABOR, MATERIALS, EQUIPMENT, AND TRANSPORTATION AS REQUIRED TO PROPERLY INSTALL ALL NEW HVAC SYSTEMS OR RELATED COMPONENTS AS INDICATED ON PLANS AND SPECIFIED HEREIN. 10. ALL NEW EQUIPMENT AND MATERIAL TO BE INSTALLED AS PART OF THE RENOVATION SHALL BEAR AN UNDERWRITERS LABORATORIES LABEL (UL), AND INSTALLED IN THE APPROVED MANNER FOR WHICH THEY ARE DESIGNED. 11. CONTRACTOR SHALL DOCUMENT AND RELAY ANY MAJOR DEVIATIONS FROM THE DESIGN DOCUMENTS, AND ATTAIN APPROVAL FROM THE E.O.R. BEFORE PROCEEDING. AS-BUILT COPIES SHALL BE PROVIDED INDICATING ALL CHANGES AND DEVIATIONS MADE DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE COMPLETED AS-BUILT DRAWINGS TO E.O.R. FOR RECORD AND PUBLISHING. 12. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS TO KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. 13. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE CITY'S REPRESENTATIVE TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK SHALL BE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, THE CITY NEEDS ADVANCE NOTICE PER APPROVAL SCHEDULE. 14. THE ARRANGEMENT OF EQUIPMENT, DUCTWORK, AND PIPING SHOWN ON THE DRAWINGS IS BASED UPON INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF DESIGN AND IS NOT INTENDED TO SHOW EXACT DIMENSIONS PECULIAR TO A SPECIFIC MANUFACTURER. THE DRAWINGS ARE, IN PART, DIAGRAMMATIC AND SOME FEATURES OF THE ILLUSTRATED EQUIPMENT INSTALLATION MAY REQUIRE REVISION TO MEET ACTUAL EQUIPMENT INSTALLATION REQUIREMENTS. STRUCTURAL SUPPORTS, FOUNDATIONS, CONNECTED PIPING, VALVES, PIPE SUPPORTS AND ELECTRICAL CONDUIT SPECIFIED MAY HAVE TO BE ALTERED OR ADDITIONAL ITEMS REQUIRED TO ACCOMMODATE THE EQUIPMENT PROVIDED. NO ADDITIONAL PAYMENT WILL BE MADE FOR SUCH REVISIONS, ALTERATIONS AND ADDITIONS. 15. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AT THE SITE MAKING FIELD MEASUREMENTS AND SHOP DRAWINGS NECESSARY FOR FABRICATION AND INSTALLATION OF HVAC SYSTEMS. MAKE ALLOWANCE FOR BEAMS, PIPES AND OTHER OBSTRUCTIONS IN BUILDING CONSTRUCTION. CHECK DRAWINGS SHOWING WORK OF OTHER TRADES AND CONSULT WITH THE STATE'S REPRESENTATIVE IN THE EVENT OF POTENTIAL INTERFERENCE. SHOP DRAWINGS SHALL BE MINIMUM 1/4"=1'-0" SCALE, INDICATING FITTINGS, SIZES, WELDS AND CONFIGURATIONS AND SUBMITTED TO ENGINEER FOR REVIEW. 16. CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF HIS WORK. 17. BEFORE COMMENCEMENT OF WORK, CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS, ELEVATIONS, AND CHARACTERISTICS OF ALL UTILITIES. 18. THE CONTRACTOR SHALL SECURE AND PAY ALL FEES AND PERMITS PERTAINING TO THE CONTRACT. 19. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 20. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS. 21. GALVANIZED SHEET METAL SHALL BE PROVIDED FOR ALL HVAC DUCT SYSTEMS, AND CONSTRUCTED, SUPPORTED AND INSTALLED IN ACCORDANCE WITH THE 2019 CALIFORNIA MECHANICAL CODE AND THE LATEST SMACNA STANDARDS. 22. ALL PIPING SHALL BE INSTALLED IN A NEAT WORKMANSHIP-LIKE MANNER AND BE SUPPORTED AS REQUIRED BY CODES. PIPING SHALL BE SET UP AND DOWN AND OFFSET AS REQUIRED TO SUIT FIELD CONDITIONS. DIELECTRIC COUPLINGS SHALL BE USED WHERE DISSIMILAR METALS ARE JOINED. 23. CONTRACTOR SHALL PROVIDE ALL NECESSARY SUPPORTS FOR FIXTURES, DUCTWORK, PIPING, AND MECHANICAL EQUIPMENT, IN ORDER TO COMPLY WITH SEISMIC REQUIREMENTS AS OUTLINED BY THE LATEST EDITION(S) OF THE CALIFORNIA BUILDING CODE, SMACNA INSTALLATION STANDARDS, AND ALL RELATED LOCAL ORDINANCES. 24. ALL VALVES, UNIONS, ETC. TO BE LINE SIZE UNLESS OTHERWISE INDICATED ON DRAWINGS. 25. UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH THREADED TYPE VALVE AND PRIOR TO EQUIPMENT CONNECTIONS. 26. ALL BRACING OF DUCTS AND PIPING SHALL BE A. INSTALLED IN ACCORDANCE WITH SMACNA GUIDELINES, OR AS DETAILED AND SPECIFIED HEREIN. SEE SEISMIC PROTECTION NOTE SHEET FOR MORE INFORMATION. B. WHERE BRACING DETAILS ARE NOT SHOWN ON THE DRAWINGS OR IN THE GUIDELINES, THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER 27. A COPY OF THE GUIDELINES PUBLISHED BY SMACNA SHALL BE PROVIDED BY THE CONTRACTOR AND KEPT ON THE JOB AT ALL TIMES. 28. CONTRACTOR SHALL NOT BORE, NOTCH, CUT, OR PENETRATE INTO A STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER OF RECORD AND STATE'S REPRESENTATIVE. 29. ALL CONDUIT AND WIRE REQUIRED FOR THE DIRECT DIGITAL CONTROL SYSTEM SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. THE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL ELECTRICAL ITEMS REQUIRED FOR AN OPERATIONAL CONTROLS SYSTEM. 30. ALL DUCTWORK AND PIPING INSULATION SHALL MEET FIRE AND SMOKE HAZARD RATING AS TESTED UNDER PROCEDURE ASTM E-84, NFPA 255 AND UL 723 AND SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND MAXIMUM SMOKE DEVELOPED RATING OF 50. 31. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ROUTING OF ALL DUCTWORK AND PIPING AND SUBMIT DETAILED, CLEARLY LEGIBLE, FULL SIZE (MINIMUM 30"x42") DUCT AND PIPING SHOP DRAWINGS IN AUTOCAD FORMAT FOR APPROVAL FROM THE ENGINEER PRIOR TO FABRICATION, CONSTRUCTION AND INSTALLATION OF DUCTWORK AND PIPING. 32. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF COMPONENTS AT LEAST TWO WEEKS PRIOR TO INSTALLATION. 33. CITY'S REPRESENTATIVE SHALL INSPECT AND APPROVE OF ALL WORK BEFORE COVERING WITH INSULATION OR INSTALLATION WITHIN CEILING SPACE. 34. APPROVAL OR DISAPPROVAL BY THE INSPECTOR OF RECORD DOES MEAN APPROVAL OR FAILURE TO COMPLY WITH THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. ANY DESIGN WHICH IS NOT CLEAR OR IS AMBIGUOUS SHALL BE REFERRED TO THE EOR AND OWNER FOR INTERPRETATION OR CLARIFICATION. 35. CONTRACTOR SHALL USE ALL NECESSARY APPROVED MEANS TO PROTECT HIS PORTION OF THE WORK BEFORE, DURING, AND AFTER INSTALLATION, UNTIL ACCEPTED, AND TO PROTECT THE INSTALLED WORK AND MATERIALS OF OTHER TRADES IN A LIKE MANNER. IN THE EVENT OF ANY DAMAGE, CONTRACTOR SHALL MAKE ALL REQUIRED REPAIRS AND REPLACEMENTS TO THE SATISFACTION OF THE EOR AND OWNER AND AT NO ADDITIONAL COST TO THE OWNER. 36. NEITHER THE E.O.R. OR OWNER SHALL BE RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR THE SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. ALL SUCH MATTERS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 37. A MINIMUM OF 36" CLEAR WORKING SPACE, NOT LESS THAN 30" WIDE, SHALL BE MAINTAINED IN FRONT OF ALL SWITCHES, OVERCURRENT PROTECTION DEVICES, AND ELECTRICAL CONTROL COMPONENTS. 38. CONTRACTOR SHALL OBTAIN AND FOLLOW ALL REQUIREMENTS, GUIDELINES, RULES, AND PROCEDURES FOR CONSTRUCTION. 39. DEMOLITION OF ANY EXISTING AC UNITS, DUCTWORK, AND PIPING SHALL BE COORDINATED WITH FACILITIES AND OPERATIONS. CONTRACTOR SHALL SCHEDULE WORK TO MINIMIZE SHUT-DOWN OF EXISTING UNITS. 40. EXISTING SURFACES AND AREAS NOT INCLUDED IN THE WORK AREA SHALL BE PROTECTED FROM DAMAGE BY APPROVED MEANS. IF DAMAGE OCCURS, THE DAMAGE SHALL BE REPAIRED BY THE CONTRACTOR TO SATISFACTION OF THE E.O.R. AND OWNER AND AT NO ADDITIONAL COST TO THE OWNER. 41. REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS PROJECT AND LEAVE THE PREMISES CLEAN AND ORDERLY UPON COMPLETION OF WORK. 42. UPON COMPLETION OF PIPING, BUT PRIOR TO APPLICATION OF INSULATION, THE CONTRACTOR SHALL TEST THE PIPING SYSTEMS FOR LEAKS. EQUIPMENT WHICH MAY BE DAMAGED BY THE SPECIFIED TEST CONDITIONS SHALL BE ISOLATED. 43. ON INSULATED PIPING: ALL VALVES HANDLES, AIR VENTS AND PRESSURE/ TEMPERATURE READOUT PORTS TO BE PROVIDED WITH 2" EXTENSION TO CLEAR PIPING INSULATION. 44. INDEPENDENT BALANCING AND TESTING CONTRACTOR SHALL PROVIDE WRITTEN AIR BALANCE REPORT FOR ALL HVAC EQUIPMENT INCLUDED IN THIS PROJECT. 45. ALL EXISTING DUCTING TO REMAIN SHALL BE CLEANED 46. PRIMARY CONTACT FOR EQUIPMENT SPECIFIED IS: RAMIRO RODRIGUEZ ENGINEERED SALES MANAGER, LENNOX COMMERCIAL PHONE: (951) 491-9195 EMAIL: [email protected] GENERAL NOTES ABBREVIATIONS AFF ABOVE FINISHED FLOOR BDD BACKDRAFT DAMPER CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CFSD COMBINATION FIRE/SMOKE DAMPER CL CENTER LINE CV CONTROL VALVE (D) DEMO DEMO DEMOLISH/DISCONNECT & REMOVE (E) EXISTING EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EOR ENGINEER OF RECORD ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMP. °F FAHRENHEIT FC FAN COIL UNIT FLA FULL LOAD AMPS FPM FEET PER MINUTE FS FIRE SPRINKLER FT FEET GPM GALLONS PER MINUTE HHWS HEATING HOT WATER SUPPLY HHWR HEATING HOT WATER RETURN HTS HIGH TEMP. WATER SUPPLY HTR HIGH TEMP. WATER RETURN HOA HAND/OFF/AUTO SWITCH HP HORSEPOWER HR HOUR IN INCHES IN. W.C. INCHES OF WATER COLUMN KW KILOWATT L LENGTH (L) LINER LAT LEAVING AIR TEMPERATURE LBS POUNDS LWT LEAVING WATER TEMP. MAX MAXIMUM MFG MANUFACTURER MIN MINIMUM MUA MAKEUP AIR (N) NEW NG NATURAL GAS OSA OUTSIDE AIR dP DIFFERENTIAL PRESSURE PH PHASE QTY QUANTITY RA RETURN AIR RF RETURN FAN RG RETURN GRILLE RH RELATIVE HUMIDITY SA SUPPLY AIR SD SMOKE DETECTOR SF SUPPLY FAN SR SUPPLY REGISTER SQFT. SQUARE FEET TI TEMPERATURE INDICATOR TT TEMPERATURE TRANSDUCER TSTAT THERMOSTAT TYP TYPICAL TSP TOTAL STATIC PRESSURE V VOLTS VAV VARIABLE AIR VOLUME VEL VELOCITY VFD VARIABLE FREQUENCY DRIVE VIF VERIFY IN FIELD VP VELOCITY PRESSURE WG WATER GAUGE WT WEIGHT SD W/AIR FLOW INDICATORS SAME SAME TAO - SAME --- FLEX CONNECTION TO DIFF./REG. WALL GRILLE W/AIR FLOW INDICATORS WALL REG. W/AIR FLOW INDICATORS TRANSFER AIR OPENING RR W/AIR FLOW INDICATOR SUPPLY DUCT DROP AD AD CAP AD SD SAME - RRER CAP B.O.D. -- AD
- AD
- AD
-- TV-- ACCESS DOOR (BOTTOM OF DUCT) ROUND DIFFUSER/REGISTER/GRILLE SQUARE SUPPLY DIFFUSER SQUARE RETURN REGISTER SQUARE EXHAUST REGISTER CAPPED END ACCESS DOOR (SIDE OF DUCT) TRANSITION FROM RECT. TO ROUND SPLITTER EXPANSION JOINT AIR EXTRACTOR TURNING VANES PBD SBFC MVD OBD VDSMAFD FSD-- FD MOTORIZED VOLUME DAMPER PARALLEL BLADE DAMPER SECURITY BARS IN DUCT OPPOSED BLADE DAMPER FLEXIBLE DUCT CONNECTOR MANUAL VOLUME DAMPER COMBINATION FIRE/SMOKE DAMPER AUTOMATIC FIRE DAMPER SMOKE DETECTOR RETURN DUCT DROP EXHAUST DUCT DROP FIRE DAMPER

R RISE SLOPE
---- SLOPE--- DOUBLE LINE 12X8
D 12 Ø SYMB. 12X8 DROP 12 Ø
--- SYMB. SINGLE LINE ABBR. DUCT RISE IN DIRECTION OF AIR FLOW EXHAUST DUCT RISER ACOUSTICALLY LINED DUCT SUPPLY DUCT RISER RETURN DUCT RISER DIRECTION OF SLOPE DESCRIPTION DUCT DROP IN DIRECTION OF AIR FLOW RECT DUCT WITH SIZE (W X H) ROUND DUCT WITH SIZE (DIAMETER) SYMBOLS HVAC TST THERMOSTAT SENSOR THERMOSTAT SD DUCT SMOKE DETECTOR HS SAME HUMIDITY SENSOR SAME SAME SAME POC POINT OF CONNECTION POD POINT OF DISCONNECTION SAME SAME---- 415
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m0.02 mechanical schedules.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" MECHANICAL SCHEDULES M0.02 ID ZONE SERVED MFG/MODEL TYPE INPUT (BTUH) OUTPUT (BTUH) AFUE TEMP RISE (°F) HIGH STATIC (IN. WG.) VENT PIPE (IN) GAS CONN. (IPS) BLOWER ELECTRICAL DIMENSION, LxWxH (IN) FILTER3 WEIGHT (LBS) REMARKS HIGH LOW HIGH LOW HIGH LOW HEATING COOLING INTAKE EXHAUST HP CFM ADJ. CFM4 VOLT PH HZ FLA MOP SIZE EFF. ZONE 1 OFFICES LENNOX SL297UH080NV48C UPFLOW, 2-STAGE HEAT, VARIABLE SPEED BLOWER, ULTRA-LOW NOX 80,000 52,000 78,000 51,000 97.50% 45-75 30-60 0.8 1 2 2 1/2 3/4 620- 1730 H: 1,007 C: 623 120 1 60 10.1 15 29.25 x 21 x 33 20 X 25 X 2 MERV 13 154 1, 2, 3, 4, 5 ZONE 2 LOBBY/ RECPTION H: 1,173 C: 1,186 1, 2, 3, 4, 5 ZONE 3 COUNCIL CHAMBERS H: 1,173 C: 1,186 1, 2, 3, 4, 5 FU1FU2FU3 NATURAL GAS FURNACE SCHEDULE AC1AC2AC3 OUTDOOR AIR-COOLED CONDENSER SCHEDULE ID ZONE SERVED MFG/MODEL NOM. TONN. SEER EER LINE OD (IN) REFRIGERANT NO. OF COMP. NO. OF CIRCUIT ELECTRICAL DIMENSION, LxWxH (IN) WEIGHT (LBS) REMARKS LIQUID SUCTION TYPE CHARGE VOLT PH HZ MOP MCA ZONE 1 OFFICES LENNOX ML14XC1-048-233 4 14.5 12.5 3/8 7/8 R-410A 9LB 8OZ 1 1 208/ 230 3 60 20 18.9 28.25 x 28.25 x 39.25 218 1 ZONE 2 LOBBY/ RECPTION 1 ZONE 3 COUNCIL CHAMBERS 1 INDOOR COOLING COIL SCHEDULE ID ZONE SERVED MFG/MODEL NOM. TONNAGE TYPE LINE CONN. (IN) DIMENSION, LxWxH (IN) WEIGHT (LBS) REMARKS SUCTION OD LIQUID OD COND. DRAIN ZONE 1 OFFICES LENNOX CX35-60C-6F 5 CASED 7/8 3/8 2 x 3/4 22 x 21 x 32.25 55 1 ZONE 2 LOBBY/ RECPTION 1 ZONE 3 COUNCIL CHAMBERS 1 CC1CC2CC3 ECONOMIZER SCHEDULE ID ZONE SERVED MFG/MODEL APPROVALS MIN OA (CFM) REMARKS ZONE 1 OFFICES LENNOX C2ECON23K CA TITLE 24 ASHRAE 90.1 205 1 ZONE 2 LOBBY/ RECPTION 245 1 ZONE 3 COUNCIL CHAMBERS 350 1 EC1EC2EC3 1. PROVIDE WITH RETURN AIR BASE CAN SIZED FOR ECONOMIZER CONNECTION. 2. PROVIDE WITH MFG AIR FILTER RACK KIT OR PROVIDE FILTER RACK IN FURNACE RETURN AIR BASE CAN. 3. AIR FILTERS MUST HAVE A MAXIMUM INITIAL RESISTANCE 0.25 IN WC @ 350 FPM. 4. ADJUST FURNACE BLOWER SPEED DIP SWITCH SETTINGS TO ACHIEVE THE ADJUSTED SECOND STAGE HEATING CFM FOR THE GIVEN ZONE. ZONE 1 FURNACE NOT TO BE CONNECTED FOR 2ND STAGE BLOWER SPEEDS. 5. PROVIDE WITH MANUFACTURER SUPPLIED COMBINATION VENT TERMINATION KIT 1. OUTDOOR UNIT MUST BE COMPATIBLE AND FROM THE SAME MANUFACTURER AS THE INDOOR COOLING COIL. 1. INDOOR UNIT MUST BE COMPATIBLE AND FROM THE SAME MANUFACTURER AS THE OUTDOOR CONDENSING UNIT AND FURNACE. THERMOSTAT SCHEDULE ID ZONE SERVED MFG/MODEL REQUIRED FEATURES ZONE 1 OFFICES HONEYWELL VISIONPRO 8000 SMART THERMOSTAT 7-DAY PROGRAMMABLE, MULTI-STAGE, 2-STAGE HEATING/COOLING CONTROL, AUTO CHANGEOVER, MINIMUM VENTILATION PROGRAMMING, COMPLIANT WITH CA TITLE 24 ENERGY CODE ZONE 2 LOBBY/ RECPTION ZONE 3 COUNCIL CHAMBERS T1T2T3 REGISTER/DAMPER SCHEDULE R/D1R/D2R/D3 1. ANY CHANGE TO FINISH OF REGISTER MUST BE APPROVED BY EOR. ID MFG/MODEL TYPE SIZE NC FINISH REMARKS HART COOLEY REG: #814OB DAMP: 9200V 4-WAY STEEL REGISTER W/ OPPOSED BLADE DAMPER 10 X10 30 BAKED ENAMEL, WHITE 1 12 X 12 1 1-WAY STEEL REGISTER W/ OPPOSED BLADE DAMPER 6 X 24 1 1. PROVIDE WITH MFG SUPPLIED RETURN AIR SENSOR. PROGRAM FOR DIFFERENTIAL TEMPERATURE OPERATION. 416
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m0.03 title 24 mandatory measures.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" TITLE 24 MANDATORY MEASURES M0.03 417
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m0.04 title 24 certificate of compliance.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" TITLE 24 CERTIFICATE OF COMPLIANCE M0.04 418
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m0.05 title 24 certificate of compliance.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" TITLE 24 CERTIFICATE OF COMPLIANCE M0.05 707-290-9844 M 40818 12/28/2022 419
RFRG. 1 1/2" NG
1" NG
3/4" NG
1" NG RFRG. RECEPTION HT:VARY WORK ROOM HT:8'-2" OFFICES / WORK SPACES HT:8'-2" HALL 1 HT:8'-2" CITY MANAGER HT:8'-2" BOOK KEEPER HT:8'-2" RECORDS VAULT HT:8'-2" CITY CLERK HT:8'-2" STRG 2 HT:8'-2" MEN HT:8'-2" UTILITY HT:8'-2" WOMEN HT:8'-2" CLOSET
HT:8'-2" COUNCIL CHAMBER HT:VARY HALL 2 HT:8'-2" ARCHITECTURAL VAULT HT:8'-2" LOBBY HT:VARY SINK HT:8'-2" 1 ABCDEFGHIJK 2 3 4 5 6 7 8 9 10 CONDENSER CONDENSER T T 18" Ø
18" Ø 18" Ø
14" Ø 7" Ø
7" Ø
7" Ø 10" Ø14" Ø 7" Ø
7" Ø 18" Ø
7" Ø MECH ROOM HT:VARY RFRG. 1 1/2" NG
1" NG
3/4" NG
1" NG RFRG. CONDENSER CONDENSER
18" Ø 0 4' 8' MECHANICAL DEMOLITION FLOOR PLAN M1.01 SCALE: 1/4" = 1' MECHANICAL CEILING DEMOLITION PLAN 1 N Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m1.01 mechanical demolition floor plan.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" GENERAL NOTES: 1. CONTRACTOR SHALL SUBMIT A PROPOSED SELECTIVE DEMOLITION PLAN IF ADDITIONAL ACCESS IS REQUIRED. 2. PRIOR TO ANY NG DEMO, CONTRACTOR SHALL: A. NOTIFY PROJECT MANAGER 72 HRS IN ADVANCE OF ANY INTERRUPTION OF SERVICE. B. RECORD ALL EQUIPMENT BEING SERVED. C. SHUTOFF NG SUPPLY AT BUILDING SERVICE D. INSTALL SHUTOFF VALVE AT DISCONNECT POINT. E. RETURN BUILDING NG SERVICE AND VERIFY OPERATION OF (E) EQUIPMENT. 3. SEE SPECIFICATIONS FOR REFRIGERANT DEMOLITION PLAN. 4. OWNER HAS THE RIGHT TO SALVAGE (E) EQUIPMENT 5. CONTRACTOR MUST PROVIDE RODENT ABATEMENT AND INSULATION CLEANING IN ATTIC AND MECHANICAL ROOM PRIOR TO DEMOLITION. 6. COORDINATE WITH OWNER FOR RELOCATING (E) DUMPSTERS DEMOLITION KEYNOTES: DEMO (E) INSULATED SA DUCT. DEMO (E) INSULATED RA & OSA DUCT. DEMO (E) FURNACE EXHAUST VENT AND CHIMNEY CEILING ATTACHMENT BELOW CEILING AND CAP PENETRATION. ROOF CAP TO REMAIN. DEMO (E) NATURAL GAS FURNACE. DEMO (E) COOLING COIL BOX. DEMO (E) ECONOMIZERS AND ASSOCIATED SENSORS/ CONTROLS. DEMO (E) THERMOSTAT AND CONTROL WIRING. PREP FOR (N) THERMOSTAT. DEMO (E) CONDENSING UNITS & REFRIGERANT PIPING. DEMO (E) CONDENSATE DRAIN PIPING. DEMO (E) CEILING DIFFUSER. PROTECT ADJACENT CEILING. DEMO (E) WALL DIFFUSER. PROTECT ADJACENT WALL. DEMO (E) NG PIPING & INSTALL 1 12" NG SHUTOFF VALVE. PROTECT-IN-PLACE (E) BATHROOM EXHAUST. PROTECT-IN-PLACE (E) RA GRILLE. PROTECT-IN-PLACE (E) SA DUCT. PROTECT-IN-PLACE (E) WALL DIFFUSER. PROTECT-IN-PLACE (E) NG METER & SHUT-OFF VALVE. SEE GENERAL NOTES FOR NG DEMO PHASING. PROTECT-IN-PLACE (E) FLOOR DRAIN. PROTECT-IN-PLACE (E) ACCESS PANEL. DEMO PORTION OF WALL APPROX. 11' AFF FOR (N) DUCT PENETRATION SEE M3.01 FOR LOCATION. DEMO ABANDONED WOOD FRAMED PLENUM BOX AT EXTERIOR WALL SAWCUT AND REMOVE (E) ASPHALT FOR (N) CONCRETE EQUIPMENT PADS 123456789 1 1 7 111 2 22 7 2 1 2 1 2' TYP 3'-412" TYP 2' TYP 6" 1011121314151617 10 10 10 10 10 10 11111111 16 16 15 1 14 13 1317 14 SCALE: 1/2" = 1' MECHANICAL DEMOLITION FLOOR PLAN 2 12 x 12 10 x 10 10 x 10 24 x 6 24 x 6 24 x 6 24 x 6 OPEN TO FINISH FLOOR (E) EXTERIOR DUMPSTER ENCLOSURE 0 2' 4' 3 M1.02 5 M1.02 2 M1.02 1 M1.02 OPEN TO FINISH FLOOR 2 M1.01 12 x 12 12 x 12 12 x 12 1819 8 8 6 24 5 9 12 4 5 9 ELEC PANEL 9 5 4 3 2 18 ELEC PANEL 19 HALF HEIGHT CMU WALL 1 OPEN TO FINISH FLOOR 2 4 M1.02 6 M1.02 7 M1.028 M1.02 20 20 21 21 21 3'-412" TYP 22 420
SCALE: - ATTIC DUCTING 1 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m1.02 existing conditions photographs.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" SCALE: - ATTIC DUCTING 2 SCALE: - DUMPSTER ENCLOSURE 3 SCALE: - HIGH CEILING RECEPTION 4 SCALE: - HIGH CEILING LOBBY 5 SCALE: - MECHANICAL ROOM 6 SCALE: - MECHANICAL ROOM VENT PIPING 7 SCALE: - EXISTING FURNACES 8 EXISTING CONDITIONS PHOTOGRAPHS M1.02 421
1 1/2" NG RECEPTION WORK ROOM OFFICES / WORK SPACES HALL 1 CITY MANAGER BOOK KEEPER RECORDS VAULT CITY CLERK STRG 2 MEN UTILITY CLOSET WOMEN COUNCIL CHAMBER HALL 2 ARCHITECTURAL VAULT LOBBY SINK 1 ABCDEFGHIJK 2 3 4 5 6 7 8 9 10 T T T 16" Ø
18" Ø
16" Ø 16" Ø 16" Ø
14" Ø 12" Ø 10" Ø 10" Ø
7" Ø
7" Ø
7" Ø
10" Ø 8" Ø
8" Ø
16" Ø 14" Ø 9" Ø 8" Ø
8" Ø 16" Ø
10" Ø 3/8" LIQUID 7/8" SUCTION TYP 3/8" LIQUID 7/8" SUCTION TYP1" NG 1" NG Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m2.01 mechanical new work floor plan.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" MECHANICAL NEW WORK FLOOR PLAN M2.01 1 M3.1 1 3 3 3 4444 33 3 5 5 5 2 2 2 7 9 12 11 10 9 12 12345678 C: 128 CFM C: 90 CFM SCALE: 1/4" = 1' 0 4' 8' MECHANICAL NEW FLOOR PLAN 1 GENERAL NOTES: 1. NEW DUCTING AND EQUIPMENT IS ONE METHOD SHOWN FOR REFERENCE. CONTRACTOR SHALL SUBMIT PROPOSED INSTALLATION SHOP DRAWINGS FOR APPROVAL PRIOR TO INSTALL. 2. DUCTING AND PIPING IN MECHANICAL ROOM NOT SHOWN FOR CLARITY. SEE M3.01. 3. TEST AND BALANCE EACH HVAC EQUIPMENT AND REGISTERS 4. INSTALL EQUIPMENT PER MFG INSTRUCTIONS 5. CONDENSATE DRAINS SHALL SLOPE DOWN MINIMUM 2% 6. MAXIMUM STATIC PRESSURE OF 0.8 INCH WC 7. CFM SHOWN FOR COOLING MODE. ZONE 1 SHALL BE PROGRAMMED FOR FIRST STAGE BLOWER SPEEDS ONLY 8. ALL REGISTERS SHALL BE PROVIDED WITH OPPOSED BLADE DAMPER CONTROL NEW WORK KEYNOTES: PROVIDE (N) INSULATED SA DUCT. ANCHOR AND BRACE PER DETAIL 1/M4.01 PROVIDE (N) INSULATED RA DUCT ANCHOR AND BRACE PER DETAIL 1/M4.01 PROVIDE (N) CEILING REGISTER WITH INTEGRATED DAMPER. PATCH AND PAINT SURFACE AS NEEDED TO MATCH EXISTING. SEE DETAIL 3/M4.01 PROVIDE (N) WALL REGISTER W/ INTEGRATED DAMPER. PATCH AND PAINT ADJACENT SURFACE TO MATCH EXISTING. PROVIDE (N) ZONE TSTAT. MOUNT 48" AFF TO TOP OF T-STAT. PROVIDE ALL CONDUIT LABELING, WIRE, ETC. FOR FULL FUNCTIONALITY. CONTRACTOR MAY REUSE (E) CONDUIT. NEW CONDUIT MUST BE ROUTED INSIDE WALL AND/ OR ATTIC SPACE. PATCH AND PAINT ADJACENT SURFACE TO MATCH EXISTING. PROVIDE (N) REINFORCED CONCRETE PAD PER DETAIL 5/M4.01. PROVIDE (N) OUTDOOR AC UNIT. ANCHOR TO PAD. CONTRACTOR SHALL USE EITHER MFG SUPPLIED FOOT ANCHORS OR SNUBBER BRACKETS DESIGNED FOR SEISMIC LOAD. PROVIDE (N) INSULATED REFRIGERANT PIPING. ROUTE FROM (N) OUTDOOR UNITS TO CORRESPONDING ZONE INDOOR COOLING COIL. SECURE RIGID PIPE TO UNISTRUT FLOOR/ WALL 6' O.C. PROVIDE (N) NG FURNACE. FURNACE SHALL BE SECURELY FASTENED TO (N) FURNACE RETURN AIR SUPPORT BOX/BASE CAN. PROVIDE WITH PRE-FILTER AT BASE OF UNIT OR IN BASE CAN. PROVIDE (N) INDOOR COOLING COIL. COOLING COIL SHALL BE SECURELY FASTENED TO FURNACE OR INDEPENDENTLY SUPPORTED. PROVIDE (N) FURNACE RETURN AIR SUPPORT BOX/BASE CAN . FURNACE RETURN AIR SUPPORT BOX SHALL BE SIZED FOR CONNECTION TO ECONOMIZER AND MINIMAL PRESSURE LOSS. BASE CAN SHALL BE DESIGNED TO SEISMICALLY SUPPORT HVAC EQUIPMENT AND ANCHORED TO (E) FLOOR SLAB PROVIDE (N) ECONOMIZER. ECONOMIZER SHALL BE INSTALLED WITH OA AND RA TEMPERATURE SENSOR INSTALLED FOR DIFFERENTIAL PRESSURE OPERATION. ECONOMIZER CONTROLS SHALL BE COMPATIBLE AND CONNECTED TO CORRESPONDING ZONE THERMOSTAT. PROVIDE (N) NG PIPING SUPPLY TO FURNACES WITH SHUT-OFF VALVE AND SECURE WITH RIGID PIPE HANGER. SEE M3.01. PROVIDE (N) 2" PVC FURNACE EXHAUST AND VENT PIPE THROUGH VENTED WALL. TERMINATE 12" BEYOND EXTERIOR WITH COMBINATION TERMINATION KIT, HIGH ON WALL. VENT PIPING SHALL BE SUPPORTED AND PROVIDED WITH MINIMAL BENDS. SEE M3.01 PROVIDE (N) 34" CONDENSATE DRAIN LINES FOR COOLING COILS AND FURNACE. EXTEND TO FLOOR DRAIN. SNAKE AND CLEAN (E) FLOOR DRAIN FRAME (N) WALL OPENING FOR DUCT PENETRATION. SEE DETAIL 4/M4.01 PROVIDE (N) DUCT CAP PROVIDE EXPANDED DUCT OPENING FOR OAR TO ECONOMIZER. SEE M3.01. CLEAN AND REPAIR VENTED WALL MESH. FRAME OUT (N) OPENING IN VENTED WALL FOR EXHAUST PENETRATION. SEE M3.01 SEAL (E) ATTIC AND MECHANICAL ROOM PENETRATIONS FOR RODENT PROTECTION WITH 18 GAUGE GALVANIZED STEEL WIRE MESH. MAX OPENING SIZE 1/4" PROVIDE DUCT CLEANING FOR EXISTING DUCTS, GRILLS, AND DIFFUSERS 18 6" 18 2 1 6 7 6 7 6 8 1AC 2AC 3AC MECH ROOM 10 11 1 13 TYP. 17 91011 1FU 1CC 1EC 2FU 2CC 2EC 3FU 3CC 3EC 12131415161718192021 19 13 16 15 15 14 14 2'-438" 6" CLR TYP 2'-6" CLR TYP 2'-438" 1' 3' CLR TYP N C: 210 CFM C: 210 CFM 20 21 T1 T2 T3 22 2222 R/D1 R/D1 R/D2 R/D2 R/D2 R/D2 R/D3R/D3R/D3R/D3 23 TYP 23 C: 210 CFM C: 210 CFM C: 128 CFM C: 283 CFM C: 170 CFM C: 170 CFM 422
SCALE: 1/2" = 1' MECH ROOM ENLARGED FLOOR PLAN 1 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m3.01 enlarged mechanical floor plan & sections.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" ENLARGED MECHANICAL FLOOR PLAN & SECTIONS M3.01 SCALE: 1/2" = 1' MECH ROOM NORTH ELEVATION 2 SCALE: 1/2" = 1' MECH ROOM SOUTH ELEVATION 3 GENERAL NOTES: 1. DUCT ROUTING AND EQUIPMENT LAYOUT IS FOR REFERENCE. CONTRACTOR MUST SUBMIT MECHANICAL SHOP DRAWINGS PRIOR TO INSTALLATION FOR APPROVAL 2. INSTALL ALL EQUIPMENT PER MANUFACTURERS RECOMMENDATION 3. INSTALL ALL EQUIPMENT AND DUCTING TIGHT TO NORTH WEST CORNER OF ROOM 4. FURNACE INTAKE VENT NOT SHOWN ON FLOOR PLAN FOR CLARITY. CONTRACTOR TO PROVIDE COMBINATION VENT/EXHAUST TERMINATION KIT. 3 M3.01 4 M3.01 1FU 1CC 1EC 2FU 2CC 2EC 3FU 3CC 3EC SCALE: 1/2" = 1' MECH ROOM EAST ELEVATION 4 2 M3.01 (E) VENTED WALLS (E) 6" WOOD BEAM (E) 1-1/2" NG SUPPLY 2 M4.01 (E) VENTED WALL 18" Ø 16" Ø 16" Ø 16" Ø 14" Ø18" X 16" 24" X 24" 24" X 24" 24" X 24" 1EC 2FU2CC 2EC 3EC 1EC 3FU 3FU 3CC 3CC 1FU 1CC 1CC SCALE: 1-1/2" = 1' EQUIPMENT CONNECTIONS 5 (N) 1-1/2" NG SHUT-OFF VALVE (N) 2" EXHAUST VENT OA INTAKE (N) 2" EXHAUST VENT (E) FRAMING TYP FURNACE RETURN AIR BASE W/ FILTER (N) NG FIRED FURNACE (N) COOLING COIL FURNACE MFG SUPPLIED DRAIN TRAP ASSEMBLY TO DRAIN P-TRAP FOR COOLING COIL CONDENSATE COIL MAIN DRAIN CONNECTION FURNACE DRAIN CONNECTION 1" NG BRANCH NG SUPPLY GROUND JOINT UNION 12" MANUAL SHUT-OFF VALVE DRIP LEG FURNACE NG CONNECTION 12" FLEX CONNECTION FURNACE EXHAUST VENT FRAME OUT OPENING 1" NG BRANCH 1-1/4" NG BRANCH MAIN ROUTE CONDENSATE DRAIN TO (E) FLOOR DRAIN WOOD FRAMED EXHAUST PENETRATION. PAINT TO MATCH EXISTING REPAIR BIRD SCREEN FURNACE EXHAUST VENT 15'-612" 8'-1112" 12'-4" 10'-112" 7'-934" CONDENSATE DRAIN PIPING ECONOMIZER INTAKE HOOD H: 1,007 CFM C: 623 CFM H: 1,173 CFM C: 1,186 CFM H: 1,173 CFM C: 1,186 CFM 9'-2" TYP. REF. BOTTOM OF DUCT FILTER SECTION 2'-712" TYP. REF. TYP. 2' REF. PENETRATE HIGH ON WALL 2' TYP. REF. 2'-9" TYP. REF. 2' TYP. REF. 350 CFM MIN 245 CFM MIN 205 CFM MIN 5 M3.01 SUPPORT VENT/EXHAUST ASSEMBLY 2" EXHAUST CONNECTION 2" INTAKE CONNECTION TERMINATION ASSEMBLY INTAKE AIR EXHAUST AIR 21 316" 38 78" 4 12" SCALE: 1-1/2" = 1' VENT/EXHAUST TERMINATION 6 6 M3.01 423
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m4.01 mechanical details.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" MECHANICAL DETAILS M4.01 EACH MAX. LOAD HANGER/LBS. /INCHES DIAMETER ROUND DUCT STRAP 21" TO 36" 1"x 18 GA. UP TO 20" 1"x 20 GA. 3020 1. PROVIDE TRANSVERSE BRACING AT 30FT MIN AND LONGITUDINAL BRACING AT 60 FT MIN AND AT EACH CHANGE IN DIRECTION.* 2. COMPLY WITH TITLE 24, 2019 CBC SECTION 1616. 3. SEE ANSI/SMANCA 001-2008 CHAPTER 8 FOR BRACING SPACING AND SIZES FOR DUCT SIZES NOT SHOWN. 4. SEE ANSI/SMACNA 001-2008 TABLE 3-2 FOR CABLE SIZES NOT SHOWN. 5. USE INSULATED DUCT SUPPORTS TO MAINTAIN INSULATION VALUE IN SUPPORTED DUCT SECTIONS. 6. HANGERS MUST NOT DEFORM DUCT SHAPE. 7. CONTRACTOR TO VERIFY MINIMUM DUCT SUPPORT AND BRACING SPACING INDICATED ABOVE WITH THEIR DUCT SUPPORT DESIGN. 8. DUCT SUPPORT AND BRACING ANCHORAGE TO PRIMARY STRUCTURE SHALL BE DETAILED BY CONTRACTOR. SEE SPECIFICATIONS FOR DELEGATED DESIGN SUBMITTAL REQUIREMENTS. *BRACING IS NOT REQUIRED FOR HANGER STRAPS LESS THAN 12" IN LENGTH ROUND ADAPTER GYPSUM BOARD CEILING DUCT INSULATION OPPOSED BLADE DAMPER IN DUCT WOOD BEAM OR R.A. DUCT RECTANGULAR OR ROUND S.A. ROUND DUCTWORK SUPPORT STRAP INSTALL PER SMACNA INSULATED FLEXIBLE SUPPLY AIR DIFFUSER OR RETURN AIR GRILLE FLEXIBLE AIR DUCTS AND CONNECTORS SHALL NOT BE MORE THAN 5 FEET IN LENGTH. NOTES: 1. SCALE: NOT TO SCALE TYPICAL DIFFUSER/ GRILLE INSTALLATION DETAIL 3 SCALE: NOT TO SCALE WALL PENETRATION DETAIL 2 SCALE: NOT TO SCALE WALL FRAMING 4 SCALE: NOT TO SCALE NEW CONCRETE PAD 5 SCALE: NOT TO SCALE SINGLE DUCT HANGER 1 SAWCUT EXISTING ASPHALT CONCRETE PAVEMENT. FIELD VERFY THICKNESS NOTE: SEE PLAN FOR PAD SIZE. SMOOTH TROWEL FINISH 34" CHAMFER TYP. ALL AROUND #4 @ 12" O.C. (E) ROOF FRAMING (N) AC UNIT (N) 4 x 4 FRAME HEADER (N) 2 x 4 FRAME SUPPORT CUT (E) WALL FRAMING (E) WALL FRAMING (N) DUCT PENETRATION DO NOT CUT, NOTCH, OR MOVE WALL MEMBER UNDER ROOF BEAM (N) 2 x 4 FRAME SUPPORT (E) WALL FRAMING (E) WALL FRAMING TYP. (E) WALL PACK SPACE BETWEEN DUCT & SLEEVE WITH HEAVY DENSITY ACOUSTICAL INSULATION (TYP.) APPLY HEAVY BEAD OF SEALANT AROUND DUCT (TYP.) 22 GA. SHEET METAL WALL SLEEVE PROVIDE SEISMIC RESTRAINTS FOR AC. ANCHOR W/ HILTI EPOXY OR WEDGE ANCHORS ROUND DUCT (N) STRUCTURAL SUPPORT BEAM SIMPSON STRONG TIE GALVANIZED SHEET METAL STRAP DUCT HANGER 5'-0" O.C. SEE SCHEDULE FOR SIZE. 12" MAX* ONLY IF REQUIRED 5/8" A307 MACHINE BOLT AND NUT DUCT HANGER STRAPS AND DUCT STRAPS MINIMUM 1" WIDE GALVANIZED STEEL. 22 GAUGE FOR 24" ROUND DUCTS AND LESS. GALVANIZED STEEL STRAPS SHALL BE SPACED 10' ON CENTER MAX. SIMPSON STRONG-TIE RWV37212 3/8" ROD HANGER OR APPROVED EQUAL 2"x2"x16 GAUGE GALVANIZED STEEL DIAGONAL ANGLE BRACE AT ALTERNATE SIDES OF EVERY HANGER 45° SECURE TO STRUCTURE OPTION 1: HANGER RODS OPTION 2: HANGER STRAPS 6" MIN 4" MIN 6" MIN 424
DSOLDHRCCY1Y2GW2 W1CI - I +RCI - I +R TERMINAL BOARD (TB1) INDOOR EQUIP. (TB84) OUTDOOR EQUIP. (TB83) SENSOR (TB78)

DISCHARGE

AIR SENSOR

OUTDOOR
AIR SENSOR CY CONTROL BOARD OUTDOOR UNIT FURNACE O/B Y2Y1 OCCRGW1 W2 TERMINAL STRIP, UNIT 2 (TB15)ECONOMIZERTERMINAL STRIP, CLASS 2 V (TB1) A6 ECONOMIZER CONTROLLER ACT 24V ACT COM ACT 2-10 IAQ 24V IAG COM IAQ 2-10 S-BUS S-BUS S-BUS S-BUS S-BUS S-BUS OAT OAT MAT MAT RCY1-0 Y1-1 Y2-0 Y2-1 AUX1 OUT EXH1 E-GND OCC AUX2 IN U1U1RRcKC THERMOSTAT LAY2GY AY2GYWS1S1 W2 AUX -E CONVENTIAL HEAT PUMP S1S1 O/B O/B Y2Y1 OCCRGW1 W2 OUTDOOR UNIT FURNACE ECONOMIZER THERMOSTAT TS RT26 TS RT1 TS RT27 SCALE: - WIRING DIAGRAM 1 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions DATE: 12/28/2022 4:34 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\05 mechanical\m5.01 hvac schematic & controls.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 ApprovalsDate Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -100% Design 12/28/2022 EPSS24" x 36" HVAC SCHEMATIC & CONTROLS M5.01 INSTALL ECONOMIZER MIXED AIR SENSOR DOWN STREAM OF EVAPORATOR. SENSOR TO BE SUPPLIED BY ECONOMIZER MFG INSTALL ECONOMIZER OUTDOOR AIR SENSOR AS CLOSE AS POSSIBLE TO INLET OF OUTDOOR AIR. SENSOR TO BE SUPPLIED BY ECONOMIZER MFG REPLACE (E) 40VA TRANSFORMER IN FURNACE WITH ECONOMIZER SUPPLIER 75VA TRANSFORMER GENERAL NOTES: 1. CONTRACTOR SHALL DEVELOP AND IMPLEMENT CONTROLS WITH EQUIPMENT CONTROLS REPRESENTATIVE. SYSTEM MUST PROVIDE AT A MINIMUM: A. MINIMUM OUTSIDE AIR VENTILATION REQUIREMENTS PER ECONOMIZER SCHEDULE ON M0.2 B. TWO (2) STAGE HEATING AND COOLING. C. 7-DAY PROGRAMMING BASED ON OCCUPANCY D. WI-FI ENABLED USER ACCESS 2. ALL WIRING, CONDUITS, AND FITTINGS SHALL BE PROVIDED BY CONTRACTOR FOR FULL OPERATION. INSTALL CONDUIT IN WALL OR ABOVE CEILING INSTALL ECONOMIZER RETURN AIR SENSOR AS CLOSE AS POSSIBLE TO INLET OF OUTDOOR AIR. SENSOR TO BE SUPPLIED BY ECONOMIZER MFG DISABLE SECOND STAGE FOR ZONE 1 BY MEANS OF CONTROLS OR WIRING 425
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions- - DATE: 12/28/2022 4:35 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\08 electrical\e0.01 electrical general notes.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 Approvals 1 Date Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -Preliminary Design 10/20/2022 DRSA24" x 36" JCCA 385 VAN NESS AVENUE, SUITE 208 ASSOCIATES, INC. J.C. CHANG & ENGINEERS ARCHITECTS PLANNERS TORRANCE, CALIFORNIA 90501 PH (310) 212-7644 FAX (310) 212-5272 JCCA #: 22980-1 ELECTRICAL GENERAL NOTES E0.01 LIGHT, THIN LINES INDICATE EXISTING. HEAVY, THICK LINES INDICATE NEW HEAVY, SHORT DASHED LINES INDICATE DEMOLITION OR REMOVAL TYPICAL PLAN LEGEND ABBREVIATIONS ELECTRICAL SYMBOL LIST SWITCHBOARD 480/277V, 3Ø, 4W OR 208/120V, 3Ø, 4W PANELBOARD 480/277V, 3Ø, 4W OR 208/120V, 3Ø, 4W P4-10 BRANCH CIRCUIT DESTINATION (PANEL NAME-CIRCUIT NUMBER) HOMERUN INDICATES PROVIDING CONDUIT AND CONDUCTORS MINIMUM CONDUIT SIZE: 3/4" MINIMUM CONDUCTOR SIZE: #12AWG PROVIDE 3/4"C-2#12+1#12G WHERE NO CONDUIT/WIRE SIZE IS STATED. PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUIT WIRING. CONTRACTOR RESPONSIBLE FOR DE-RATING CONDUIT WITH MORE THAN SIX CURRENT CARRYING CONDUCTORS PER CEC 310. #12 AWG FOR CIRCUITS UP TO 100' #10 AWG FOR CIRCUITS FROM 100' TO 200' #8 AWG FOR CIRCUIT GREATER THAN 200' UNFUSED DISCONNECT SIZED AS INDICATED ON DWGS. CONTRACTOR TO CONFIRM FUSE SIZING BASED ON EQUIPMENT MANUFACTURER RECOMMENDAITON J JUNCTION BOX 1. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH APPLICABLE CODES AND STANDARDS. SEE T0.1 FOR A LIST OF APPLICABLE CODES AND STANDARDS. 2. CEC 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. 3. CEC 130.5(C): VOLTAGE DROP: THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS TO THE FARTHER CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT. 4. ALL CABLE/WIRE, CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY & THEY SHALL BE ROUTED TO SUIT ACTUAL FIELD CONDITIONS, EXCEPT WHERE LOCATIONS ARE EXPLICITLY DIMENSIONED ON THE DRAWINGS. 5. THE ELECTRICAL CONSTRUCTION DRAWINGS PROVIDED HEREIN ARE DIAGRAMMATIC AND SYMBOLIC IN REPRESENTATION. LOCATIONS DEPICTED ON THE DRAWINGS FOR ELECTRICAL EQUIPMENT/DEVICES (MOTORS, STARTERS, DISCONNECT SWITCHES, RECEPTACLES, JUNCTION/OUTLET BOXES, CONTROL SWITCHES, EQUIPMENT RACKS, SMALL TRANSFORMERS, ETC.) ARE ONLY APPROXIMATE. FURTHERMORE, THE EQUIPMENT/DEVICE DEPICTIONS ARE GENERALLY SYMBOLIC AND NOT DRAWN TO SCALE. 6. IN EVENT OF CONFLICT OR DISCREPANCY BETWEEN DRAWINGS, SPECIFICATIONS, CONTRACT DOCUMENTS, SPECIFICATIONS, DRAWINGS AND SITE CONDITIONS, THE CONTRACTOR SHALL PROVIDE THE MORE STRINGENT OF THE DRAWINGS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THE CONSTRUCTIONS AND BIDDING PURPOSES. 7. ELECTRICAL DRAWINGS INDICATE NEW WORK, UNLESS OTHERWISE NOTED. EXISTING ELECTRICAL SYSTEMS ARE NOT SHOWN EXCEPT WHERE INTERFACING IS REQUIRED. 8. ALL NEW BOXES, PANELS, OUTLET COVERS, ENCLOSURES, ETC. MOUNTED ON THE EXTERIOR OF ANY STRUCTURE SHALL BE WEATHERPROOF (NEMA 3R MINIMUM) & ALSO PAINTED TO MATCH THE EXISTING BUILDING/STRUCTURE. 9. ALL EXISTING SURFACES DAMAGED BY NEW CONSTRUCTION, SHALL BE PATCHED, OR REPAINTED TO MATCH EXISTING CONDITIONS, PAINTED SURFACE SHALL BE PAINTED FROM BREAK TO BREAK. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PATCH & REPAIR ALL DAMAGE TO EXISTING SURFACES AND FINISHES. FURTHERMORE, THE AFFECTED AREA(S) OF WORK SHALL BE REPAIRED TO MATCH THE FINISH THAT WAS PREVIOUSLY EXISTING, PRIOR TO THE COMMENCEMENT OF WORK. 10. RUN CONDUITS CONCEALED IN WALLS AND CEILINGS UNLESS NOTED. CUT EXISTING WALLS AS REQUIRED. PATCH AND PAINT TO MATCH EXISTING SURFACE. 11. UPDATE ALL POWER PANEL DIRECTORIES AND ELECTRICAL OUTLET IDENTIFICATION LABELS (KROYTAPE) TO REFLECT NEW CONSTRUCTION. 12. ALL FLEX AND SEALTIGHT CONDUIT SHALL HAVE A GROUND CONDUCTOR. 13. CONDUITS PENETRATING FIRE RATED AREAS SHALL BE SEALED, INSTALLED ON OUTSIDE OF CONDUIT, WITH APPROVED FIRE STOP MATERIAL TO MAINTAIN THE SAME FIRE RATING AS ORIGINAL. 14. ALL MATERIALS AND WORKS ARE NEW, UNLESS OTHERWISE NOTED. EXISTING ELECTRICAL SYSTEMS ARE NOT SHOWN EXCEPT WHERE INTERFACING IS REQUIRED. 15. MAINTAIN CONTINUITY OF ALL EXISTING CIRCUITS OR PORTIONS THEREOF AFFECTED BY NEW WORK. 16. CONTRACTOR SHALL VISIT AND FAMILIARIZE AT THE SITE PRIOR TO START OF PROJECT. COORDINATE WITH OWNER REPRESENTATIVE FOR EXACT LOCATION OF ALL EQUIPMENT. 17. SEISMIC ANCHORAGE OF ALL NEW AND EXISTING PIPING, CONDUIT, DUCTWORK, EQUIPMENT, PANELS, ETC. SHALL BE BY FOLLOWING THE MANUFACTURERS SPECIFICATIONS IN ACCORDANCE WITH THE 2019 CBC AND THE LATEST ISSUE OF "ENGINEERED SEISMIC BRACING OF SUSPENDED UTILITIES" AS PUBLISHED BY THE INTERNATIONAL SEISMIC APPLICATION TECHNOLOGY (ISAT) OPA-0485, MASON INDUSTRIES OPA-0349, TOLCO OPA-0300, COOPER B-LINE OPA-0114, OR M.W. SAUSSE OPA-0029 OR EQUAL. 18. CONDUIT FITTINGS FOR USE IN EMT RUNS SHALL BE GALVANIZED STEEL CONNECTORS AND COUPLINGS SHALL BE WATERTIGHT TYPE. 19. ALL SINGLE PHASE CIRCUITS SHALL HAVE A DEDICATED NEUTRAL. 20. ALL CONDUITS SHALL BE PROVIDED AN EQUIPMENT GROUNDING CONDUCTOR SIZED PER CEC 250. 21. ALL NEW (ADDITIONAL) METALLIC STRUCTURES AND EQUIPMENT FABRICATED WITH METALLIC MATERIALS SUCH AS GENERATORS, MOTOR FRAME, ENCLOSURES, ETC, PANELS, RACEWAY SHALL BE PERMANENTLY & EFFECTIVELY GROUNDED, WHETHER SHOWN ON DRAWING OR NOT. GROUND CABLE SHALL BE CONNECTED TO COLD WATER PIPE PER CEC 250.52(A)(1), TO BUILDING GROUNDING PER CEC 250.52(A)(2) OR CONNECTED TO GROUND ROD PER CEC 250.52(A)(5). 22. OWNER RESERVES THE RIGHT TO REQUIRE MINOR CHANGES IN LOCATION OF OUTLETS OR EQUIPMENT PRIOR TO ROUGHING-IN WITHOUT INCURRING ANY ADDITIONAL COST OR CHARGES. 23. DURING CONSTRUCTION, DO NOT INTERRUPT OR IMPEDE OPERATION AND WORK IN ADJACENT AREAS. 24. UPON COMPLETION OF ALL WORK, THOROUGHLY CLEAN ALL EQUIPMENT AND DUCTS FROM INSIDE AND OUTSIDE OF EQUIPMENT. REMOVE ALL TRACES OF SOIL, DUST, LABELS, GREASE, OIL, AND FOREIGN MATERIALS. CLEANUP AND REMOVE FROM THE PREMISES ALL DEBRIS AND SURPLUS MATERIAL CAUSED BY THIS WORK. 25. WHERE THERE IS A CONFLICT BETWEEN THE DRAWINGS & ANY RELEVANT CODES, THE CODES SHALL GOVERN, EXCEPT WHERE THE DRAWINGS INDICATE A QUALITY LEVEL SUPERIOR TO THAT SPECIFIED BY THE CODES. 26. THE WORD "PROVIDE" MEANS THAT THE CONTRACTOR SHALL FURNISH, INSTALL, ADJUST, TEST, AND INTEGRATE INTO A COMPLETE SYSTEM THE ITEM INDICATED INCLUDING ALL HARDWARE, WIRING AND MISCELLANEOUS ITEMS AS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM. GENERAL NOTES 15A, 125V DUPLEX RECEPTACLE (NEMA 5-15R) SUBSCRIPTS DENOTE THE FOLLOWING: "WP" - WEATHERPROOFED DISTANCE DENOTES EXISTING CIRCUIT BREAKER EACH COPPER GROUND MINIMUM AMPERE CIRCUIT LOW VOLTAGE AMPERE INTERRUPTING CAPACITY ABOVE FINISHED FLOOR NOT TO SCALE WP WEATHER PROOF SWBD SWITCHBOARD TYP. TYPICAL UG UNDERGROUND SW SWITCH PB PULL BOX SLD SINGLE LINE DIAGRAM P POLE PNL PANELBOARD (R) RELOCATED SUB SUBSTATION (N) NEW TIME DELAY UNLESS OTHERWISE NOTED UON XFMR, TRANSFORMER TRANSF. VD VOLTAGE DROP TD DEMOLITION D(E) CBEACUGND, G MIN ACKT LVAIC AFF NTS (D) WP T THERMOSTAT MANUAL SWITCH 426
SCALE: N/A ELECTRICAL PANEL SCHEDULE 1 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions- - DATE: 12/28/2022 4:35 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\08 electrical\e0.02 electrical panel schedule.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 Approvals 1 Date Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -Preliminary Design 10/20/2022 DRSA24" x 36" JCCA 385 VAN NESS AVENUE, SUITE 208 ASSOCIATES, INC. J.C. CHANG & ENGINEERS ARCHITECTS PLANNERS TORRANCE, CALIFORNIA 90501 PH (310) 212-7644 FAX (310) 212-5272 JCCA #: 22980-1 ELECTRICAL PANEL SCHEDULE E0.02 SCALE: N/A ELECTRICAL PANEL SCHEDULE 2 21 2 221 1NEW WORK KEYNOTES: PROVIDE CIRCUIT BREAKER, SIZED AS SHOWN. 2 REPLACE CIRCUIT BREAKER, SIZED AS SHOWN. 1NEW WORK KEYNOTES: PROVIDE CIRCUIT BREAKER, SIZED AS SHOWN. 2 REPLACE CIRCUIT BREAKER, SIZED AS SHOWN. 427
RECEPTION WORK ROOM OFFICES / WORK SPACES HALL 1 CITY MANAGER BOOK KEEPER RECORDS VAULT CITY CLERK STRG 2 MEN UTILITY CLOSET WOMEN COUNCIL CHAMBER HALL 2 ARCHITECTURAL VAULT LOBBY SINK CONDENSER CONDENSER T T ABCDEFGHIJK 1 2 3 4 5 6 7 8 9 10 0 2' 4' N ELECTRICAL DEMOLITION FLOOR PLAN E1.01 SCALE: 1/4" = 1' ELECTRICAL DEMOLITION FLOOR PLAN 1 GENERAL NOTES: 1. CAREFULLY COORDINATE SCOPE OF WORK WITH ALL DISCIPLINES, WITH PARTICULAR ATTENTION TO MECHANICAL DRAWINGS. IN PARTICULAR, CAREFULLY REVIEW EQUIPMENT SCHEDULES TO COORDINATE ELECTRICAL CHARACTERISTICS, INCLUDING VOLTAGE, MINIMUM CIRCUIT AMPACITY (MCA), AND MAXIMUM OVERCURRENT PROTECTION (MOCP). CONFIRM DISCONNECT SWITCH AND STARTING MEANS ARE PROVIDED BY THE MECHANICAL UNIT MANUFACTURER AND MAKE ADJUSTMENTS BASED ON FIELD CONDITIONS FOR FINAL CONNECTIONS. 2. CIRCUITS HAVE BEEN SHOWN BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CIRCUITS WITHIN THE SCOPE OF WORK AND UPDATING SCHEDULES ACCORDINGLY. 3. REMOVE ALL FEEDERS BACK TO SOURCE PANEL AND CLEARLY MARK AS SPARE. DEMOLITION KEYNOTES: DISCONNECT ELECTRICAL POWER AND CONTROL PROVISIONS FOR RHEEM AIR CONDITIONING UNIT AND MAKE READY FOR REMOVAL. DISCONNECT ELECTRICAL POWER AND CONTROL PROVISIONS FOR RHEEM GAS FURNACE AND MAKE READY FOR REMOVAL. DEMOLISH ELECTRICAL POWER AND CONTROLS FOR THERMOSTAT. 12 1 22 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions- - DATE: 12/28/2022 4:35 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\08 electrical\e1.01 electrical demolition floor plan.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 Approvals 1 Date Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -Preliminary Design 10/20/2022 DRSA24" x 36" JCCA 385 VAN NESS AVENUE, SUITE 208 ASSOCIATES, INC. J.C. CHANG & ENGINEERS ARCHITECTS PLANNERS TORRANCE, CALIFORNIA 90501 PH (310) 212-7644 FAX (310) 212-5272 3 JCCA #: 22980-1 3 TYP. (E) 225A, 240/120V, 1PH, 3W PANEL A (E) 208/120V PANEL B (D) FURNACE (D) FURNACE (D) CONDENSING UNIT 428
RECEPTION WORK ROOM OFFICES / WORK SPACES HALL 1 CITY MANAGER BOOK KEEPER RECORDS VAULT CITY CLERK STRG 2 MEN UTILITY CLOSET WOMEN COUNCIL CHAMBER HALL 2 ARCHITECTURAL VAULT LOBBY SINK T T T A-40 A-42A-36 A-34 B-2,4,6 WP J B-7,9,11 B-14,16,18 GFCI ABCDEFGHIJK 1 2 3 4 5 6 7 8 9 10 0 2' 4' ELECTRICAL NEW WORK FLOOR PLAN E2.01 GENERAL NOTES: 1. CAREFULLY COORDINATE SCOPE OF WORK WITH ALL DISCIPLINES, WITH PARTICULAR ATTENTION TO MECHANICAL DRAWINGS. IN PARTICULAR, CAREFULLY REVIEW EQUIPMENT SCHEDULES TO COORDINATE ELECTRICAL CHARACTERISTICS, INCLUDING VOLTAGE, MINIMUM CIRCUIT AMPACITY (MCA), AND MAXIMUM OVERCURRENT PROTECTION (MOCP). CONFIRM DISCONNECT SWITCH AND STARTING MEANS ARE PROVIDED BY THE MECHANICAL UNIT MANUFACTURER AND MAKE ADJUSTMENTS BASED ON FIELD CONDITIONS FOR FINAL CONNECTIONS. 2. CIRCUITS HAVE BEEN SHOWN BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CIRCUITS WITHIN THE SCOPE OF WORK AND UPDATING SCHEDULES ACCORDINGLY. NEW WORK KEYNOTES: PROVIDE 3/4"C-3#12 + 1#12G TO EACH AIR CONDITIONING UNIT. PROVIDE 3/4"C-2#12 + 1#12G TO EACH FURNACE. PROVIDE 3/4"C WITH CONTROL WIRING BETWEEN (N) THERMOSTAT AND ASSOCIATED MECHANICAL UNITS. COORDINATE WITH MECHANICAL. PROVIDE (3) 20A, 3P CIRCUIT BREAKERS (FOR EACH AIR CONDITIONING UNIT). PROVIDE (3) 15A, 1P CIRCUIT BREAKERS (FOR EACH FURNACE). SEE E0.2 FOR PANEL SCHEDULES. PROVIDE WATERPROOF, GFCI, NEMA 5-15R CONVENIENCE RECEPTACLE. SEE E0.2 FOR PANEL SCHEDULES. PROVIDE WALL-MOUNTED NEMA 3R PULLBOX, SIZED PER CEC. PENETRATE EXTERIOR WALL, SEAL TO MAINTAIN WATERTIGHT CONDITION. CONTINUE RUNNING FEEDER INSIDE BUILDING. PROVIDE 3/4"C WITH CONTROL WIRING BETWEEN (N) AIR CONDITIONING UNIT AND (N) FURNACE. INTERCEPT AND EXTEND EXISTING BRANCH CIRCUIT SERVING (E) FURNACE TO (N) FURNACE. PROVIDE UNFUSED, 30A, 240V, 3-POLE HEAVY DUTY DISCONNECT SWITCH IN NEMA-3R ENCLOSURE. 1 1 3 23 4 4 Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions- - DATE: 12/28/2022 4:35 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\08 electrical\e2.01 electrical new work floor plan.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 Approvals 1 Date Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -Preliminary Design 10/20/2022 DRSA24" x 36" JCCA 385 VAN NESS AVENUE, SUITE 208 ASSOCIATES, INC. J.C. CHANG & ENGINEERS ARCHITECTS PLANNERS TORRANCE, CALIFORNIA 90501 PH (310) 212-7644 FAX (310) 212-5272 JCCA #: 22980-1 5 (E) 100A, 208Y/120V (PANEL B) 6789 9 79 8 N SCALE: 1/4" = 1' ELECTRICAL NEW WORK FLOOR PLAN 1 (E) 225A, 240/120V, 1PH, 3W (PANEL A) 5 AC1AC2AC3 FU3 2 8 FU2 2 8 FU1 2 8 1 8 1 8 10 6 10 10 10 T1 3 T2 3 T3 429
Sheet Title Project Address2 PORTUGUESE BEND RD ROLLING HILLS, CA 90274 ROLLING HILLS CITY HALL HVAC REPAIR No Revisions - -
DATE: 12/28/2022 4:35 PM
FILE: c:\users\samsimon\onedrive - s&k\projects\2226 - crh city hall hvac replacement\cad\08 electrical\e4.01 electrical details.dwg Sheet No. Client City of Rolling Hills 2 Portuguese Bend Rd Rolling Hills, CA 90274 Approvals 1 Date Description 2233 Via Fernandez Palos Verdes Est, CA 90274 Stamp p. (310) 494-6910 w. www.skcsi.com Project No: Permit App No: Project Phase: Date: Drawn By: Checked By: Sheet Size: 092226 -Preliminary Design 10/20/2022 DRSA24" x 36" JCCA 385 VAN NESS AVENUE, SUITE 208 ASSOCIATES, INC. J.C. CHANG & ENGINEERS ARCHITECTS PLANNERS TORRANCE, CALIFORNIA 90501 PH (310) 212-7644 FAX (310) 212-5272 JCCA #: 22980-1 ELECTRICAL DETAILS E4.01 SECTION A-A AA
2 3C
1 3B3A 3C
2 3C SYSTEM NO. C-AJ-1597 ASNI/UL1479 (ASTM E814) F RATINGS -- 3 HR T RATING -- 2 AND 2-3/4 HR (SEE ITEM 3C) L RATING AT AMBIENT -- LESS THAN 1 CFM/SQ FT L RATING AT 400° F -- LESS THAN 1 CFM/SQ FT W RATING -- CLASS 1 (SEE ITEM 3) 1. FLOOR OR WALL ASSEMBLY — MIN 4-1/2 IN. THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF OR 1600-2400 KG/M3) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS*. FLOOR MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED PRECAST CONCRETE UNITS*. MAX DIAM OF OPENING 10 IN. MAX DIAM OF OPENING IN FLOOR CONSTRUCTED OF HOLLOW-CORE PRECAST CONCRETE UNITS IS 7 IN. SEE CONCRETE BLOCKS (CAZT) AND PRECAST CONCRETE UNITS (CFTV) CATEGORIES IN FIRE RESISTANCE DIRECTORY FOR NAMES OF MANUFACTURERS. 2. THROUGH-PENETRANT — ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED CONCENTRICALLY OR ECCENTRICALLY WITHIN OPENING. ANNULAR SPACE BETWEEN PENETRANT AND PERIPHERY OF OPENING SHALL BE MIN 0 IN. (POINT CONTACT) TO MAX 2 IN. PENETRANT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF PENETRANTS MAY BE USED: A. STEEL PIPE — NOM 8 IN. DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE. B. IRON PIPE — NOM 8 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE. C. COPPER TUBING — NOM 4 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING. D. COPPER PIPE — NOM 4 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE. E. CONDUIT — NOM 6 IN. DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING (EMT). 3. FIRESTOP SYSTEM — THE DETAILS OF THE FIRESTOP SYSTEM SHALL BE AS FOLLOWS: A. PACKING MATERIAL — MIN 4 IN. THICKNESS OF MIN 4 PCF MINERAL WOOL BATT INSULATION FIRMLY PACKED INTO OPENING AS A PERMANENT FORM. IN FLOORS CONSTRUCTED OF PRECAST CONCRETE UNITS, PACKING MATERIAL TO BE FLUSH WITH BOTTOM OF FLOOR. PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL TO ACCOMMODATE THE REQUIRED THICKNESS OF FILL MATERIAL. B. FILL, VOID OR CAVITY MATERIALS* — SEALANT — MIN 1/2 IN. THICKNESS OF SEALANT OR PUTTY APPLIED WITHIN THE ANNULUS, FLUSH WITH TOP SURFACE OF FLOOR OR WITH BOTH SURFACES OF WALL. AT POINT CONTACT, APPLY MIN 1/4 IN. BEAD AT PENETRANT/CONCRETE INTERFACE ON TOP SURFACE OF FLOOR OR BOTH SURFACES OF WALL. W RATING APPLIES ONLY WHEN CFS-S SIL GG, CFS-S SIL SL (FLOORS ONLY), CP601S SEALANT OR FS-ONE MAX INTUMESCENT SEALANT IS USED. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-ONE INTUMESCENT SEALANT, FS-ONE MAX INTUMESCENT SEALANT, CFS-S SIL GG SEALANT, CFS-S SIL SL SEALANT (FLOORS ONLY) C. DUCT WRAP MATERIALS* — NOM 1-1/2 IN. OR 2 IN. THICK BLANKET, FACED ON ONE SIDE OR TWO WITH A FOIL FACING. THE PIPES SHALL BE WRAPPED WITH ONE LAYER OF DUCT WRAP. DUCT WRAP IS TO EXTEND A MINIMUM OF 36 IN. FROM TOP SURFACE OF FLOOR OR BOTH SIDES OF WALL ASSEMBLY AND A MIN OF 12 IN. FROM THE BOTTOM OF THE FLOOR. THE ENDS ARE TO BE TIGHTLY BUTTED TOGETHER AND TAPED ON TOP SIDE OF FLOOR AND BOTH SIDES OF WALL. THE EXPOSED EDGES OF THE FACED BLANKETS ARE TAPED WITH 4 IN. WIDE PRESSURE-SENSITIVE ALUMINUM FOIL TAPE. ON THE BOTTOM SURFACE OF THE FLOOR ENDS ARE TO BE TIGHTLY BUTTED TOGETHER AND WIRE BOUND. THE T, FT AND FTH RATINGS ARE 2 HR WHEN NOM 1-1/2 IN. THICK BLANKET IS USED. THE T, FT AND FTH RATINGS ARE 2 3/4 HR WHEN NOM 2 IN. THICK BLANKET IS USED. THERMAL CERAMICS INC — FIREMASTER FASTWRAP XL UNIFRAX I L L C — FYREWRAP DUCT INSULATION, FYREWRAP DUCT 1.5 INSULATION * INDICATES SUCH PRODUCTS SHALL BEAR THE UL CERTIFICATION MARK. 1 FIRE STOP DETAILS NOT TO SCALE
430
From: Vanessa Hevener
To: Alfred Visco
Cc: Elaine Jeng; Christian Horvath
Subject: RE: City Council Meeting 1-9-23 HVAC Agenda Item Date: Monday, January 9, 2023 12:48:56 PM
Attachments: image001.png
Thank you Mr. Visco. Your comments have been received.

Vanessa Hevener
Senior Management Analyst
City of Rolling Hills
2 Portuguese Bend Rd., Rolling Hills, CA 90274
E: [email protected] |O: (310) 377-1521
From: Alfred Visco < >
Sent: Monday, January 9, 2023 12:43 PM
To: Vanessa Hevener <[email protected]>
Subject: Fw: City Council Meeting 1-9-23 HVAC Agenda Item Forwarding to you.

Alfred Visco
From: Alfred Visco
Sent: Monday, January 09, 2023 12:37 PM
To: Elaine Jeng
Cc: Pat Wilson ; Leah Mirsch ; Bea Dieringer ; Jeff Pieper ; Jim Black M.D.

Subject: City Council Meeting 1-9-23 HVAC Agenda Item
I will not be able to attend this evenings meeting. Concerning the proposed HVAC work, has the consultants or anyone considered heat pumps. If the City goes forward with solar panels heat pumps would be the more elegant system. Also any HVAC system (whether hear pumps or conventional) should be specified with soft start capability. This is important for the power backup system especially if it is in whole or in part going to be batteries.

Alfred Visco
431
Agenda Item No.: 11.B
Mtg. Date: 01/09/2023
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: VANESSA HEVENER, SENIOR MANAGEMENT ANALYST
THRU: ELAINE JENG P.E., CITY MANAGER
SUBJECT: RECEIVE AND FILE AN UPDATE TO THE OUTDOOR SIREN PROJECT DATE: January 09, 2023
BACKGROUND:

In Fiscal Years 2019-2020 and 2020-2021, the City Council provided funding for the Block Captain Program to investigate communication platforms in the event of complete power failure in the community. The Block Captains and City staff used funds to purchase two-way radios and when the handheld radio option proved to be ineffective, a Request for Proposal (RFP) was issued in February 2021 to solicit proposals on other communication systems. The City received one proposal from HQE Systems, Inc. (HQE).

On April 26, 2021, Staff recommended that City Council engage the services of HQE. The City Council directed Councilmember Pieper to work with Staff to better understand the evolution of the communication project and the scope of the feasibility study. As directed, Staff met with Councilmember Pieper on four occasions: May 20, 2021, July 15, 2021, July 23, 2021 and August 12, 2021. Some of the meetings with Councilmember Pieper included the Lead Block Captains Arlene and Gene Honbo. Staff also worked with Project Manager Alan Palermo and HQE to provide technical information requested by Councilmember Pieper. The Lead Block Captains, along with members of the Block Captains were in support of a feasibility study. The City Council approved a Professional Services Agreement (PSA) with HQE to prepare a feasibility study that would identify the hardware, location of the hardware, software, system integration, and a detailed cost estimate to install a siren system for the community.

At the January 10, 2022, City Council meeting Staff presented the final Feasibility Study and recommended to City Council to conduct a community survey to gauge interest for an outdoor siren system. In review of the Feasibility Study, the City Council requested information relating to the annual maintenance cost of the proposed outdoor siren system. The City Council also requested a street level map of Solution A and Solution B presented in the Feasibility Study.

On March 14, 2022, the City Council unanimously voted to amend the PSA with HQE allocating an additional not to exceed $3,500 to investigate potential co-location sites of the poles. On June 16, 2022, HQE Staff and Block Captain Leads Arlene and Gene Honbo 432
conducted a site visit at the Main Gate, Crest Gate, Eastfield Gate and the Radar Station. In early July, HQE submitted the revised Feasibility Study that included two additional options:

Solution C included the three gates and FAA Radar Station and Solution D included only the three gates.

At the August 8, 2022, City Council meeting, Staff presented potential site locations and to consider Solution D. HQE representatives were present to answer questions from Council and members of the public. HQE informed City Council that they had completed the remaining tasks of the Feasibility Study at no cost to the City, a savings of $22,814 and invited the Council to observe a demonstration of the proposed system, if desired. City Council directed Staff to seek approval from the Rolling Hills Community Association to place the siren poles at the three gate locations.

On September 1, 2022, Staff and Councilmember Mirsch attended a demonstration of the proposed outdoor siren system equipment at HQE headquarters. The demonstration included a tour of their facility where manufacturing of the equipment was conducted in-house and a demonstration simulated a test warning that would be sent out in case of an emergency. The equipment used consisted of a single 4' speaker mounted on a pole 25 feet above ground (for Rolling Hills, there would be 4-4' speakers mounted 50 feet above ground at each gate). The quality of the intelligible voice was clear and could be easily heard. The speakers could be adjusted to rotate a few degrees at a time through the use of a software application to ensure the best sound coverage.

In our discussion with HQE, it was conveyed that they were recently awarded a contract with the City of Paradise to install 21 poles and are in the process of installing them.

On September 1, 2022, Staff also attended the Rolling Hills Community Association (RHCA) Board meeting. Per Council direction, the City Manager asked that the RHCA Manager present to the Board of Directors the City's request to place the siren poles at the three gatehouse locations. During that meeting, the City's question was not presented as requested.

As a result, the Board of Directors began asking questions with respect to public safety, an area outside the purview of the RHCA. The Board of Directors ultimately did not discuss the City's request to place siren poles at the three gates. Instead, the Board of Directors requested that the RHCA Manager meet with City Staff and that the RHCA Liaisons meet with the City Council Subcommittee to discuss why the Board of Directors were not informed of the project, if the project was warranted, and concerns relating to only having one proposer submit a proposal for the project.

In addition, per Council direction, Staff reached out to the five homes adjacent to the three gates to inform them of the project. Two residences were in support, one was opposed, and the other two did not respond.

At the September 12, 2022 City Council meeting, the City Council directed the Subcommittee members to follow up with their counterparts at RHCA. On September 15, 2022, Staff made a presentation at the Rolling Hills Community Association Board meeting requesting an approval to place the siren system at the three gates. The RHCA Board expressed concerns about the health of the guard attendants who would be exposed to high levels of sound emitting from the sirens, interference with the operations of the guardhouses, and aesthetics and noise impacts on residents. The RHCA Board ultimately voted to not support the the City's request of placing the siren system at the gates.
433
Following the RHCA Board meeting, Staff contacted HQE to seek additional information on noise levels that could be heard at the base of the poles. Based on HQE’s response, the speakers will emit up to 124 decibels 50’ above ground; however, at the base of the pole, the decibel is 90 or equivalent to a hairdryer. Included in the packet is additional information on sound prepared by HQE.

At the September 26, 2022 City Council meeting, the City Council directed Staff to do the following:
seek input from the First Responders on usage scenarios when the siren system is deployed for evacuation and non-evacuation purposes and system with voice capability vs siren only
obtain information on easement requirements from the Rolling Hills Community Association
Staff contacted Los Angeles County Fire Department Chief Bennett and Los Angeles County Sheriff's Department Captain Powers to seek their input on the proposed usage scenarios and whether siren only system or a system with siren tone and intelligible voice would be the preferred option. Based on feedback received from the First Responders, their preferred option is the combined siren tone and intelligible voice because it could provide information to residents that are comprehensible regardless of the scenario (e.g., shelter in Place or mandatory evacuation). Staff has also created a flow chart to activate the siren.

In addition, on September 28, 2022, Staff submitted a letter to the RHCA requesting easement requirements for siting of poles at locations identified in Solution A and Solution B in easements held by RHCA with a response date of October 6, 2022. It is important to note that RHCA staff was present when pole locations were identified in Solution A and Solution B.

At the October 6, 2022 RHCA Board meeting, the Board discussed the item and requested that the City follow these procedures:

1. Obtain permission from the owner of the property where the siren will be placed,

2. Submit a written request to the Board for a license(s) to use the Association easement for Board review and approval. The request should include:

Site plan with the location of the pole and any ground mounted equipment indicated,
Specifications of the height and size of the pole and any pole mounted equipment Site plans should include property and easement lines, edge of pavement and property address. If the license is approved by the Board, the City would be responsible for legal and recording fees incurred for the license agreement(s). RHCA would waive fees for excavation permits.

Per Council direction, the pole locations are identified based on the "Outdoor Siren LocationStreet Level" prepared by HQE:

Solution A - Proposed Pole Locations
Siren A-1: On Blackwater Canyon Trail (behind 13 Portuguese Bend Rd) between Lower Blackwater Canyon Rd and Portuguese Bend Road
Siren A-2: In front of 9 Upper Black Canyon Rd
434
Siren A-3: In front of 57 Saddleback Rd
Siren A-4: On Storm’s Ridge Trail/Buggy Whip Trail (near 4 Storm Hill Ln) Siren A-5: In the canyon behind 4 Possum Ridge Road
Siren A-6: Near 4 Poppy Trail
Siren A-7: In the canyon behind 1 Hackamore Rd
Siren A-8: Near 74 Portuguese Bend Rd
Siren A-9: On Crest Rd East (near 63 Crest Road East)
Solution B- Proposed Pole Locations
Siren B-1: On Pine Tree Lane (adjacent to 10 Pine Tree Ln) Siren B-2: Corner of Portuguese Bend Road and Fuld’s Furlong Trail Siren B-3: In the canyon on Crest Road East (east of 38 Crest Road East) Based on the discussion from the October 10, 2022 City Council meeting, Staff was directed to the do following:
seek permission from CalWater to place 50' poles at their water facilities identify City properties where the poles could be placed On October 19, 2022, Staff held a virtual meeting with CalWater representatives to discuss whether there is a possibility of installing poles in their three water facilities. CalWater representatives were open to the discussion and asked that the City provide additional information such as the specification of poles to be installed, length of access needed at their facilities, and any electronic equipment placed on poles. The requested information will assist CalWater to determine if the proposed poles would interfere with their current operations and/or any future planned activities at their sites. It may take up to the end of this year or early next year for CalWater to decide if their sites are viable options to install the poles.

HQE has been a generous partner with the City in providing additional information requested by Staff without receiving additional compensation. Given the new locations to investigate, it was necessary to obtain another proposal from HQE in order to conduct a site survey, perform a sound propagation analysis, provide systems option and cost to provide technical support to third-party entities. HQE submitted a proposal in the amount of $6,095 to evaluate up to four sites and correspond directly with CalWater on behalf of the City on technical matters.

At the October 24, 2022 City Council meeting, the City Council directed staff to engage the services of HQE to provide technical support in conversations with CalWater for $1,900.

To keep the community informed of the outdoor siren project, the City published a Special Blue Newsletter on October 27, 2022 identifying the proposed ten sites with the disclaimer that the final locations were not confirmed.

On October 28, 2022, Staff, HQE, and CalWater representatives held a follow-up meeting to discuss the proposed locations, specification of poles to be installed, length of access needed at their facilities, and any electronic equipment placed on poles. During the meeting, CalWater eliminated the following facilities for consideration due to space constraints: CalWater Reservoir #12, 23 Portuguese Bend (Water Tank Trail/Black Water Cayon/Tallyhand Rd), CalWater on Sunnyridge Rd in unincorporated LA County and tentatively allowed the possibility of installations of poles at the CalWater Reservoir #22 on Spur Lane and at 3960 Crest Road upon further review by various CalWater departments. On November 1, 2022, with 435
assistance from HQE, Staff submitted the requested document to CalWater for their review.

Staff anticipates to receive a response from CalWater in the next two weeks to determine if any follow-up steps are warranted.

Subsequent to that meeting, the City published another Special Blue Newsletter on November 3, 2022, updating the residents of promising news in which CalWater had tentatively allowed two facilities as possible sites for the installation of siren poles. Following that publication, Mr.

Frederick Lorig submitted an email on November 7, 2022 to Staff and the City Council to express his concerns.

At the November 14, 2022 City Council meeting, the City Council directed Staff to eliminate the CalWater facility on Spur Lane and look into two other locations: Fire Station 56 and Rancho del Mar High School, located at 12 and 38 Crest Road West.

On December 5, 2022, Staff, HQE and representatives from CalWater, Los Angeles County Fire Department, and Palos Verdes Peninsula Unified School District conducted separate consultation visits at the three proposed sites to assess the properties and answer questions from the respective agencies. All three agencies were in support of having the poles placed at their properties and were open to assisting the City with its outdoor siren project.

DISCUSSION:

At the December 13, 2022 City Council meeting, the City Council directed Staff to send out a Blue Newsletter with one side using a simplified map with the eight proposed locations and the other side with photos depicting the siren system. In addition, the Blue Newsletter should also indicate that the City Council is soliciting feedback and that this item will continue in January.

On December 22, 2022, Staff mailed the Special edition of the Blue Newsletter (attached) based on the City Council's direction. At the time of writing, the City received seven comments (attached). Due to the holiday season and to provide ample opportunity to comment on the outdoor siren project, an identical Special Blue Newsletter will be mailed on January 9, 2023 to solicit additional feedback from the community. Staff will present comments received at the January 23, 2023 City Council meeting for consideration of next steps.

FISCAL IMPACT:

There is no fiscal impact.

RECOMMENDATION:

Receive and file
ATTACHMENTS:

CL-AGN_230109_CC_22-12-21_SpecialNewsletter.pdf
CL-AGN_230109_CC_SBN Comments.pdf
CL_AGN_230109_CC_SIrenStudyUpdate_PublicComment01.pdf
CL_AGN_230109_CC_SIrenStudyUpdate_PublicComment02._Redacted.pdf CL_AGN_230109_CC_SIrenStudyUpdate_PublicComment03.pdf
CL_AGN_230109_CC_SIrenStudyUpdate_PublicComment04_Redacted.pdf CL_AGN_230109_CC_SIrenStudyUpdate_PublicComment05_Redacted.pdf 436
437
438
Comments Received from Special Edision of Blue Newsletter dated December 22, 2022

DATE NAME ADDRESS COMMENT

1. 12/26/2022 Thomas Brodie 1 Hummingbird Ln In looking at the proposed locations for the emergency warning sirens, it appears that an area of Lower (Eastfield, Chuckwagon and Outrider) would probably not be adequately covered. I am sure that considerable thought has gone into this matter. Am I missing something?

2. 12/26/2022 Allen Lay Project seems marginally useful to me. Has staff fully explored the cost of maintenance and how often it would require a test to keep it operational. I suspect the siren project has a significant cost to install and maintain therefore I am reluctant to support it.

3. 12/26/2022 Pete Hazelrigg

33 Chuckwagon
Rd
What the heck.

There is nothing on what these might be good for. An earlier proposal for alert towers was rejected.

Better that cell service capability be greatly improved. Since June, we have periods of no service and its sketchy otherwise at best. Though I understand this is a matter for RHCA.

4. 12/27/2022 Melissa McNabb Per the Blue newsletter just received, I wanted to give you our feedback re:
proposed siren locations.

Dustin McNabb and I prefer the following 3 locations:

A. Fire Station or Rancho Del Mar HS
B. Caballeros Ring.

C. RHCA Crest Rd East or CalWater 3960 Crest Rd.

Additionally, we prefer 30’ tall poles.

We are split on siren only (Dustin) vs. siren plus voice capacity (Melissa) 439

DATE NAME ADDRESS COMMENT
And we would prefer camouflage on the poles, IF they are in a normally visible area.

5. 12/28/2022 David S. Brown Sirens? Are we going back to the fifties? What a waste.

What we need is cell service. Then the authorities can communicate proper emergency messages, rather than just blaring obnoxious noise from speakers on towers. We can also call 911 if needed. Let's get into the nineties! The obsolete sirens will require periodic testing, unnecessarily bothering residents, perhaps unnecessarily alarming them.

Just get us the cell service we need!

6. 12/30/2022 Sue and Dave
Breiholz
Dear Rolling Hills City Council,
We feel the siren project would be a mistake for our city to pursue because of the following concerns:
1) The nuisance of noise to the quiet nature of the area from routine testing heard by Rolling Hills residents and the neighboring cities. 2) An alert system could be provided by good cell phone coverage. The money and energy would be better spent to create adequate cell service for our entire city. Good cell service would provide residents access to emergency services and notifications at all times.
440

DATE NAME ADDRESS COMMENT

7. 12/31/2022 Lisa L. Hancock My concerns are spending money on this unnecessary siren system. Rolling Hills is very small. I would notice if there was an earthquake or power outage without a fancy siren. Why are we doing this? I would feel safer if our cell coverage was better. And why are the sirens all clustered so close together with none down by the old Crest Road Gate? If we have so much money to spend, surely there are better uses than sirens???
441
January 9, 2023
Dear Honorable Mayor and RH City Councilmembers:

Thank you for requesting input on the Outdoor Siren System and for distributing a “fact sheet” to residents on siren options, descriptions, and possible locations. The sirens remain a viable option to satisfy the concerns on how residents are notified in the event of a complete power failure.

Block Captains prefer sirens with
• tone and intelligible voice, an option preferred by First Responders; • camouflaged tree facade coverings, if costs can be supported; • minimum number of poles throughout the city assuming either 30’ or 50’ poles and coverage is sufficient to notify all residents.

Safety of residents and adequate emergency communications are more important than preserving views. Feedback on EIS from residents include our cellular service is so unreliable in Rolling Hills that emergency notification may be problematic even with adequate power.

Respectfully submitted,
Block Captains and Support Team
Arlene Honbo, Portuguese Bend Road
Gene Honbo, Portuguese Bend Road
Debra Shrader, Saddleback Road
Kay Lupo, Georgeff Road
Ed Swart, Meadowlark Lane
Carmen Schaye, Portuguese Bend Road
Kathy Patman, Chuckwagon Road
Rae Walker, Wagon Lane
Kelly Cook, Ringbit Road West
Marita Geraghty, Southfield Drive
Arun Bhumitra, Buggy Whip Drive
Judith Haenel, Eastfield Drive
Residents
Don Crocker, Cinchring Road
Ron Sommers, Poppy Trail
Jim Scharffenberger, Appaloosa Lane
Dorothy Vinter, Georgeff
Kathleen Hughes, Caballeros
Susan Collida, Ringbit West
Maureen Hill, Cinchring
Carol Marrone, Southfield
442
From: Vanessa Hevener
To: Christian Horvath
Subject: FW: Siren Input Needed - City Council Meeting Monday Jan 9 - 7 pm Date: Monday, January 9, 2023 9:38:32 AM
Attachments: image001.png
--------- Forwarded message ---------
From: Ronald Sommer < >
Date: Sat, Jan 7, 2023 at 8:38 PM
Subject: Re: Siren Input Needed - City Council Meeting Monday Jan 9 - 7 pm To: Arlene Honbo >
ARLENE AND GENE"
Your letter to the city Council is excellent. I agree with you wholeheartedly. I have only one or two comments.
1: if the 30 to 50 foot poles are offensive to some people, why can't we use volunteer homes which have a height of perhaps 30 feet and mount a pole with a siren to the side of the house.

A 20 foot pole would make a 50 foot elevation, in addition to the height of a house relative to lower lying houses. Since the houses are white, the pole would be white in addition to the siren. A voice is essential to delineate the nature of
emergency.
2: in the case of a power outage, one would need to rely on a small solar panel and a rechargeable battery such as seen on the freeway telephones.

Ronald Sommer
Poppy Trail
443
From: Arlene Honbo
To: Christian Horvath; Vanessa Hevener
Subject: Comments from Carol Marrone
Date: Monday, January 9, 2023 12:21:26 PM
Block Captain, Carol Marrone, agrees with the letter signed by the Block Captains and Support Team. She has an additional concern:

The outdoor sirens must adequately cover all areas of Rolling Hills especially Southfield Drive and other streets in the southern part of the city. Emergency notification via sirens of just a portion of the city is unacceptable. All residents must be notified.

Thank you.

Sent from my iPhone
444
From: Jeanne Saks
To: Vanessa Hevener
Subject: Outdoor siren project
Date: Friday, January 6, 2023 3:27:57 PM
Dear Vanessa Hevener,
I am in favor of the siren project and their placements in the city.

Thank you,
Jeanne
Jeanne Colette Saks
Crest Road West
Rolling Hills, CA 90274
cell
445
446
Agenda Item No.: 12.A
Mtg. Date: 01/09/2023
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROBERT SAMARIO, FINANCE DIRECTOR
THRU: ELAINE JENG P.E., CITY MANAGER
SUBJECT: PROPOSED FISCAL YEAR 2023/24 BUDGET CALENDAR
DATE: January 09, 2023
BACKGROUND:

Each year staff develops a proposed budget calendar for City Council's review and approval.

The budget calendar includes all of the key actions and dates directly or indirectly related to the development of next year's budget, which is effective on July 1.

The proposed budget calendar related to the development of the fiscal year 2023/24 budget is attached to this report.

DISCUSSION:

The development of the fiscal year 2023/24 begins in earnest in January of each year. During this time, staff begins to develop revenue projections for the current year that become the starting point for next year's revenue estimates. This is an important first step since it establishes the revenues that will be available in the next year and, thus, to what degree the City's General Fund is balanced or unbalanced.

In February 2023, staff will bring to the City Council the mid-year report providing a status of both revenues and expenditures versus budgeted amounts. In addition, this is the first formal look at preliminary projections for the year which will establish a starting point for developing initial FY 2023/24 revenue estimates.

Later, in March, staff will bring to the Council the latest revenue projections for FY 2023/24 and a preliminary balancing strategy using existing baseline expenditures. At this time, staff will be seeking Council direction with respect to the proposed balancing strategy. In addition, staff will be seeking direction from Council regarding whether the City will be pursuing an increase to refuse rates.

During March and April, based on Council's direction, staff will work on developing the proposed budget for all funds and departments.
447
Then, over the course of three budget workshops starting in late April, staff will present the entirety of the proposed budget to Council for their consideration and feedback. The workshops will be held on Wednesday on April 19, May 3, and May 17. This will allow Council, staff, and the public to devote focused attention to the proposed budget. During these workshops, members of the public will have an opportunity to comment and provide input into the budget process.

On June 12, we will hold a public hearing, if needed, for the public to provide any protests regarding any proposed increases to refuse rates pursuant to Proposition 218. Staff will also seek any final directions from Council regarding the proposed budget scheduled for adoption on June 26, 2022.

FISCAL IMPACT:

None.

RECOMMENDATION:

Review and approve the proposed budget calendar for the development of the fiscal year 2023/24 budget.

ATTACHMENTS:

FN_BUD_230109_Calendar_FY23-24.pdf
448
City of Rolling Hills INCORPORATED JANUARY 24, 1957
NO. 2 PORTUGUESE BEND ROAD
ROLLING HILLS, CA 90274
(310) 377-1521
FAX (310) 377-7288

PROPOSED BUDGET CALENDAR
FISCAL YEAR 2023/2024
January 9, 2023 City Council receive, review and approve FY 2022/2023 budget calendar.

January 23, 2023 Finance/Budget/Audit Committee meeting with Auditor to review FY 2021/2022 Annual Financial Report.

January 23, 2023 City Council receive and review FY 2021/2022 Audited Financial Statements.

February 13, 2023 City Council receive and review FY 2022/2023 mid-year budget report showing the status of revenues and expenditures against budgeted amounts, including preliminary projections for the year.

February 20, 2023 Staff review of FY 2022/23 year-end revenues and expenditure projections with City Manager.

February 27, 2023 Finance/Budget/Audit Committee review of Financial and Investment Policies; and review and discuss Schedule of Fees and Charges
March 13, 2023 City Council review of FY 2022/2023 year-end revenue projections, preliminary FY 2023/24 revenue projections, and confirmation of FY 2023/24 preliminary balancing strategy including direction on solid waste fee increase.

March and April City staff develop proposed FY 2023/24 budget.

March 24, 2023 If the solid waste collection fees are going to be increased by CPI, public notice sent to all property owners advertising a public hearing for an increase in the solid waste collection fee. Also, as directed, public notice is required for updates to Schedule of Fees & Charges (by June 12, 2023).

April 19, 2023 Special Meeting #1 – City Council budget workshop – Presentation of FY 2023/24 Proposed General Fund Revenue Projections and Balancing Strategies.
449
City of Rolling Hills INCORPORATED JANUARY 24, 1957
NO. 2 PORTUGUESE BEND ROAD
ROLLING HILLS, CA 90274
(310) 377-1521
FAX (310) 377-7288
May 3, 2023 Special Meeting #2 - City Council budget workshop – Presentation of FY 2023/24 Proposed General Fund Expenditures by
Department.

May 17, 2023 Special Meeting #3 - City Council budget workshop - Presentation of Proposed Budgets for Special Revenue, Capital Improvement, and Refuse Fund Budgets.

June 12, 2023 Prop 218 Hearing on Proposed FY 2023/24 Solid Waste Rate Increase (if needed); and final directions from Council to staff on proposed FY 2023/24 budget.

June 26, 2023 Budget Adoption
450
Agenda Item No.: 12.B
Mtg. Date: 01/09/2023
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: JOHN SIGNO, DIRECTOR OF PLANNING & COMMUNITY SERVICES THRU: ELAINE JENG P.E., CITY MANAGER
SUBJECT: CONSIDER ENGAGING 4LEAF, INC. TO PROVIDE CODE

ENFORCEMENT SERVICES, AND DIRECT STAFF TO EXECUTE A
PROFESSIONAL SERVICES AGREEMENT FOR AN AMOUNT NOT-TOEXCEED $87,880 FOR ONE CALENDAR YEAR INCLUDING $68,380 FOR THE REMAINDER OF THE 2022-2023 FISCAL YEAR
DATE: January 09, 2023
BACKGROUND:

On February 28, 2022, the City entered into an agreement for code enforcement services with Willdan Group, Inc. (Willdan). The agreement was amended in July 2022 to cover the 2022- 2023 fiscal year. Willdan's code enforcement officers are professional and respectful of our residents. However, there has been a turnover of officers requiring retraining and delays in responses to cases. As such, the contract with Willdan was terminated on December 31, 2022.

DISCUSSION:
4LEAF, Inc. submitted a proposal in February 2022 to provide code enforcement services but was not selected. 4LEAF, Inc. is still interested in serving the City and has code enforcement officers available. Staff has emphasized the importance in providing an officer who can commit long-term and who is familiar with dead vegetation and weed abatement. The expectation is for a code enforcement officer to be available twice a week for 16 hours. Typically, the code enforcement officer will report to City Hall in the morning to handle paperwork and make phone calls. The officer would conduct field visits in the middle of the day and would return to the office in the afternoon for follow-up paperwork and phone calls.

The draft agreement attached to this staff report includes a clause that the consultant shall use best efforts to provide the same Code Compliance staff to the City to ensure operational consistency. If two staffing changes occur in any one-year period, 4LEAF, Inc. will be required to provide a written memorandum explaining the circumstances resulting in the turnover and provide the City with an action plan that ensures consistency. In addition, 4LEAF, Inc. shall provide a new officer to the City and incur the costs for proper on-boarding and training.

Although there are no guarantees that turnover will not occur, this would provide an incentive 451
for 4LEAF, Inc. to have committed staffing and gives the City leverage to renegotiate or terminate the agreement.

FISCAL IMPACT:

The 2022-2023 FY budget allocates $87,880 for contract code enforcement services. Willdan's final invoice has not yet been received but is estimated to total $19,500 for the first six months of the fiscal year (July 1, 2022 to December 31, 2022). This leaves the remaining balance at $68,380 for the remainder of the 2022-2023 fiscal year, which is adequate to cover 4LEAF's services of $105 per hour for 16 hours a week for the remainder of the fiscal year.

Additionally, assuming the budget remains the same for the 2023-2024 FY, it will be adequate to provide an officer 16 hours a week for the entire fiscal year.

RECOMMENDATION:

Direct the City Manager to execute a Professional Services Agreement with 4LEAF, Inc. for code enforcement services.

ATTACHMENTS:

CA_AGR_4Leaf_On_Call_CE PSA-c1_DRAFT-c1.pdf
PL_CON_20221128_CE_4LEAF_SOQ_without_appendix.pdf
PL_CON_4LEAF_FeeSchedule22_23.pdf
452

AGREEMENT FOR PROFESSIONAL SERVICES

CODE ENFORCEMENT SERVICES
This Agreement is made and entered into by and between the City of Rolling Hills (hereinafter referred to as the "City"), and 4Leaf, Inc. a California Corporation (hereinafter referred to as "Consultant").

RECITALS
A. The City does not have the personnel able and available to perform the services required under this Agreement.

B. The City desires to contract for consulting services for certain projects relating to code enforcement.

C. The Consultant warrants to the City that it has the qualifications, experience, and facilities to perform properly and timely the services under this Agreement.

NOW, THEREFORE, the City and the Consultant agree as follows:

1.0 SCOPE OF THE CONSULTANT’S SERVICES. The Consultant agrees to provide the services and perform the tasks set forth in the Scope of Work, attached to and made part of this Agreement as Exhibit A, except that, to the extent that any provision in Exhibit A conflicts with this Agreement, the provisions of this Agreement shall govern. The Scope of Work may be amended from time to time in writing and signed by both parties by way of written amendment to this Agreement.

2.0 TERM OF AGREEMENT. This Agreement will become effective upon execution by both parties and will remain in effect for a period of one year from said date. At its sole discretion, the City shall have the option to extend this Agreement for two, one-year terms provided that the City gives Consultant notice of the extension prior to the end date of the Agreement. This Agreement may also be expressly extended and agreed to by both parties or terminated by either party as provided herein.

3.0 CITY AGENT. The City Manager, or her designee, for the purposes of this Agreement, is the agent for the City; whenever approval or authorization is required, Consultant understands that the City Manager, or her designee, has the authority to provide that approval or authorization.

4.0 COMPENSATION FOR SERVICES. The City shall pay the Consultant for its professional services rendered and costs incurred pursuant to this Agreement in accordance with Exhibit B, the Scope of Work’s fee and cost schedule for the services attached to and made part of this Agreement subject to a do not exceed amount in the amount of $87,880/year. No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager, or her designee. Further, in the event that staff provided to the City from Consultant changes twice in any six month period (i.e., a third new staff member from Consultant is assigned 453
to the City within a six month period), Consultant shall provide this staff member to the City for 32 hours without any cost to the City so that the City can properly on-board and train this new staff member.

4.1 The Consultant shall submit to the City, by no later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month. The City shall pay the Consultant all uncontested amounts set forth in the Consultant's bill within 30 days after it is received.

5.0 CONFLICT OF INTEREST. The Consultant represents that it presently has no interest and shall not acquire any interest, direct or indirect, in any real property located in the City which may be affected by the services to be performed by the Consultant under this Agreement. The Consultant further represents that in performance of this Agreement, no person having any such interest shall be employed by it.

5.1 The Consultant represents that no City employee or official has a material financial interest in the Consultant’s business. During the term of this Agreement and as a result of being awarded this contract, the Consultant shall not offer, encourage, or accept any financial interest in the Consultant’s business by any City employee or official.

5.2 If a portion of the Consultant’s services called for under this Agreement shall ultimately be paid for by reimbursement from and through an agreement with a developer of any land within the City or with a City franchisee, the Consultant warrants that it has not performed any work for such developer/franchisee within the last 12 months, and shall not negotiate, offer, or accept any contract or request to perform services for that identified developer/franchisee during the term of this Agreement.

6.0 TERMINATION. Either the City Manager or the Consultant may terminate this Agreement, without cause, by giving the other party ten (10) days written notice of such termination and the effective date thereof.

6.1 In the event of such termination, all finished or unfinished documents, reports, photographs, films, charts, data, studies, surveys, drawings, or other documentation prepared by or in the possession of the Consultant under this Agreement shall be returned to the City.

Consultant shall prepare and shall be entitled to receive compensation pursuant to a close-out bill for services rendered in a manner reasonably satisfactory to the City and fees incurred pursuant to this Agreement through the notice of termination.

6.2 If the Consultant or the City fail to fulfill in a timely and proper manner its obligations under this Agreement, or if the Consultant or the City violate any of the covenants, agreements, or stipulations of this Agreement, the Consultant or the City shall have the right to terminate this Agreement by giving written notice to the other party of such termination and specifying the effective date of such termination. The Consultant shall be entitled to receive compensation in accordance with the terms of this Agreement for any work satisfactorily completed hereunder. Notwithstanding the foregoing, the Consultants shall not be relieved of liability for damage sustained by virtue of any breach of this Agreement and any payments due 454
under this Agreement may be withheld to off-set anticipated damages.

7.0 INSURANCE.

7.1 Without limiting Consultant’s obligations arising under paragraph 8 - Indemnity, Consultant shall not begin work under this Agreement until it obtains policies of insurance required under this section. The insurance shall cover Consultant, its agents, representatives, and employees in connection with the performance of work under this Agreement, and shall be maintained throughout the term of this Agreement. Insurance coverage shall be as follows:

7.1.1 General Liability Insurance insuring City of Rolling Hills, its elected and appointed officers, agents, and employees from claims for damages for personal injury, including death, as well as from claims for property damage which may arise from Consultant’s actions under this Agreement, whether or not done by Consultant or anyone directly or indirectly employed by Consultant. Such insurance shall have a combined single limit of not less than $1,000,000.

7.1.2 Automobile Liability Insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement in an amount of not less than $1,000,000 combined single limit for each occurrence. If Consultant or Consultant’s employees will use personal automobiles in any way on this project, Consultant shall obtain evidence of personal automobile liability coverage for each such person.

7.1.3 Worker’s Compensation Insurance for all Consultant’s employees to the extent required by the State of California. Consultant shall similarly require all authorized subcontractors pursuant to this Agreement to provide such compensation insurance for their respective employees.

7.1.4 Professional Liability Coverage for professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from the Consultant’s operations under this Agreement, whether such operations are by the Consultant or by its employees, subcontractors, or subconsultants.

The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis.

When coverage is provided on a “claims made basis,” Consultant will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover Consultant for all claims made by City arising out of any errors or omissions of Consultant, or its officers, employees, or agents during the time this Agreement was in effect.

7.2 Deductibility Limits for policies referred to in subparagraphs 7.1.1 and 7.1.2 shall not exceed $5,000 per occurrence.
455

7.3 Additional Insured. City of Rolling Hills, its elected and appointed officers, agents, and employees shall be named as additional insureds on policies referred to in subparagraphs 7.1.1 and 7.1.2.

7.4 Primary Insurance. The insurance required in subparagraphs 7.1.1 and 7.1.2 shall be primary and not excess coverage.

7.5 Evidence of Insurance. Consultant shall furnish City, prior to the execution of this Agreement satisfactory evidence of the insurance required issued by an insurer authorized to do business in California, and an endorsement to each such policy of insurance evidencing that each carrier is required to give City at least 30 days prior written notice of the cancellation of any policy during the effective period of the Agreement. All required insurance policies are subject to approval of the City Attorney. Failure on the part of Consultant to procure or maintain said insurance in full force and effect shall constitute a material breach of this Agreement or procure or renew such insurance, and pay any premiums therefore at Consultant’s expense.

8.0 INDEMNIFICATION. Consultant shall indemnify, defend with counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Consultant’s performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, regardless of City’s passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of the City. Should City in its sole discretion find Consultant’s legal counsel unacceptable, then Consultant shall reimburse the City its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation. The Consultant shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

9.0 GENERAL TERMS AND CONDITIONS.

9.1 Non-Assignability. The Consultant shall not assign or transfer any interest in this Agreement without the express prior written consent of the City.

9.2 Non-Discrimination. The Consultant shall not discriminate as to race, creed, gender, color, national origin or sexual orientation in the performance of its services and duties pursuant to this Agreement, and will comply with all applicable laws, ordinances and codes of the federal, state, county and city governments.

9.3 Compliance with Applicable Law. The Consultant and the City shall comply with all applicable laws, ordinances and codes of the federal, state, county and city governments.

9.4 Independent Contractor. Consultant is an independent contractor. This Agreement is by and between the City and the Consultant and is not intended, and shall not be construed, to 456
create the relationship of agency, servant, employee, partnership, joint venture or association, as between the City and the Consultant.

9.4.1 The Consultant shall be an independent contractor, and shall have no power to incur any debt or obligation for or on behalf of the City. Neither the City nor any of its officers or employees shall have any control over the conduct of the Consultant, or any of the Consultant’s employees, except as herein set forth, and the Consultant expressly warrants not to, at any time or in any manner, represent that it, or any of its agents, servants, or employees are in any manner employees of the City, it being distinctly understood that the Consultant is and shall at all times remain to the City a wholly independent contractor and the Consultant's obligations to the City are solely such as are prescribed by this Agreement. Each Consultant employee shall remain in the fulltime employ of Consultant, and the City shall have no liability for payment to such Consultant employee of any compensation or benefits, including but not limited to workers’ compensation coverage, in connection with the performance of duties for the City.

9.5 Copyright. No reports, maps, or other documents produced in whole or in part under this Agreement shall be the subject of an application for copyright by or on behalf of the Consultant.

9.6 Legal Construction.

9.6.1 This Agreement is made and entered into in the State of California and shall in all respects be interpreted, enforced, and governed under the laws of the State of California.

9.6.2 This Agreement shall be construed without regard to the identity of the persons who drafted its various provisions. Each and every provision of this Agreement shall be construed as though each of the parties participated equally in the drafting of same, and any rule of construction that a document is to be construed against the drafting party shall not be applicable to this Agreement.

9.6.3 The article and section, captions and headings herein have been inserted for convenience only and shall not be considered or referred to in resolving questions or interpretation or construction.

9.6.4 Whenever in this Agreement the context may so require, the masculine gender shall be deemed to refer to and include the feminine and neuter, and the singular shall refer to and include the plural.

9.7 Counterparts. This Agreement may be executed in counterparts and as so executed shall constitute an agreement which shall be binding upon all parties hereto.

9.8 Final Payment Acceptance Constitutes Release. The acceptance by the Consultant of the final payment made under this Agreement shall operate as and be a release of the City from all claims and liabilities for compensation to the Consultant for anything done, furnished or relating to the Consultant’s work or services. Acceptance of payment shall be any negotiation of the City’s check or the failure to make a written extra compensation claim within ten (10) calendar days of 457
the receipt of that check. However, approval or payment by the City shall not constitute, nor be deemed, a release of the responsibility and liability of the Consultant, its employees, subconsultants, and agents for the accuracy and competency of the information provided or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by the City for any defect or error in the work prepared by the Consultant, its employees, sub-consultants, and agents.

9.9 Corrections. In addition to the above indemnification obligations, the Consultant shall correct, at its expense, all errors in the work which may be disclosed during the City’s review of the Consultant’s work under this Agreement. Should the Consultant fail to make such correction in a reasonably timely manner, such correction shall be made by the City, and the cost thereof shall be charged to the Consultant.

9.10 Files. All files of the Consultant pertaining to the City shall be and remain the property of the City. The City will control the physical location of such files during the term of this Agreement. Consultant shall provide any such files in its possession to City upon termination of the Agreement. Consultant will be entitled to retain copies of such files upon termination of this Agreement in accordance with law.

9.11 Waiver; Remedies Cumulative. Failure by a party to insist upon the performance of any of the provisions of this Agreement by the other party, irrespective of the length of time for which such failure continues, shall not constitute a waiver of such party's right to demand compliance by such other party in the future. No waiver by a party of a default or breach of the other party shall be effective or binding upon such party unless made in writing by such party, and no such waiver shall be implied from any omissions by a party to take any action with respect to such default or breach. No express written waiver of a specified default or breach shall affect any other default or breach, or cover any other period of time, other than any default or breach or period of time specified. All of the remedies permitted or available to a party under this Agreement, or at law or in equity, shall be cumulative and alternative, and invocation of any such right or remedy shall not constitute a waiver or election of remedies with respect to any other permitted or available right of remedy.

9.12 Mitigation of Damages. In all such situations arising out of this Agreement, the parties shall attempt to avoid and minimize the damages resulting from the conduct of the other party.

9.13 Partial Invalidity. If any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way.

9.14 Attorneys' Fees. The parties hereto acknowledge and agree that each will bear his/her or its own costs, expenses, and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled. 458

9.15 Entire Agreement. This Agreement constitutes the whole agreement between the City and the Consultant, and neither party has made any representations to the other except as expressly contained herein. Neither party, in executing or performing this Agreement, is relying upon any statement or information not contained in this Agreement. Any changes or modifications to this Agreement must be made in writing appropriately executed by both the City and the Consultant.

9.16 Warranty of Authorized Signatories. Each of the signatories hereto warrants and represents that he or she is competent and authorized to enter into this Agreement on behalf of the party for whom he or she purports to sign.

10.0 NOTICES. Any notice required to be given hereunder shall be deemed to have been given by depositing said notice in the United States mail, postage prepaid, and addressed as follows:

CITY: CONSULTANT:

Elaine Jeng, P.E. 4Leaf, Inc.

City Manager Attn: Pete Roque
2 Portuguese Bend Road 5140 Birch Street, Second Floor
Rolling Hills, CA 90274 Newport Beach, CA 92660
TEL (310) 377-1521 TEL (949) 887-9432

11.0. DISCLOSURE REQUIRED. (City and Consultant initials required at 11.1)

11.1 Disclosure Required. By their respective initials next to this paragraph, City and Consultant hereby acknowledge that Consultant is a “consultant” for the purposes of the California Political Reform Act because Consultant’s duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a) or otherwise serves in a staff capacity for which disclosure would otherwise be required were Consultant employed by the City. Consultant hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the City’s Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to consultant commencing services hereunder, the City’s Manager shall prepare and deliver to consultant a memorandum detailing the extent of Consultant’s disclosure obligations in accordance with the City’s Conflict of Interest Code.

City Initials ______
Consultant Initials_________

11.2 Disclosure Not Required. By their initials next to this paragraph, City and Consultant hereby acknowledge that Consultant is not a “consultant” for the purpose of the California Political Reform Act because Consultant’s duties and responsibilities are not within the scope of the definition of consultant in Fair Political Practice Commission Regulation 18700.3(a) and is otherwise not serving in staff capacity in accordance with the City’s Conflict of Interest Code.
459
City Initials ______
Consultant Initials ______
This Agreement is executed on January __, 2023, at City of Rolling Hills, California.

CITY OF ROLLING HILLS: CONSULTANT:
___________________________________ ______________________________ Elaine Jeng, P.E., City Manager Pete Roque, Director of Code Enforcement ATTEST:
___________________________
Christian Horvath, City Clerk

APPROVED AS TO FORM:
___________________________________
Patrick Donegan, City Attorney

460

EXHIBIT A

SCOPE OF SERVICES

1. Overview
The project shall consist of Consultant’s staff coordinating with the City of Rolling Hills Community and Planning Department to provide Code Compliance staff to the City. Pete Roque shall be the Project Manager and is fully responsible for seeing that the project is completed in compliance with the provisions of the agreement. Consultant shall use best efforts to provide the same Code Compliance staff to the City to ensure operational consistency. In the event that Code Compliance staff provided to the City changes for a second time in any one year period (i.e., Consultant provides a third different staff member to the City for code compliance work), Consultant shall provide the City a written memorandum explaining the circumstances resulting in the staff turnover and provide an action plan to the City that will be employed to ensure staffing consistency to the City.

2. Scope of Work
A. Consultant’s staff shall conduct all inspections and re‐inspections of single family and multi‐family properties and public facility properties and will identify and enforce all violations of City’s municipal code, ordinances, laws, and all applicable statutes.

Personnel shall issue notifications, letters, citations and warrants when necessary to achieve compliance. Staff will be required to document all complaints received, inspections conducted through photos, notes, and correspondences.

B. In addition to the services mentioned above, Consultant will provide the following services to the City (this is not intended to be a comprehensive list):
i. Investigate complaints from the public and staff regarding violations of the municipal codes, ordinances, standards and health and safety regulations. ii. Initiate contact with residents, business representatives, and other parties to explain the nature of the violations and encourage compliance with municipal codes, zoning and land use ordinances, and community standards.
iii. Prepare notices of violation for non‐compliance according to applicable codes and regulations.
iv. Prepare reports for cases requiring legal action or civil abatement. v. When required, meet with legal counsel and provide testimony on criminal cases. vi. Maintain records of complaints, inspections, violation notices, and other field enforcement activities.
vii. Coordinate with City departments on cases as they relate to code enforcement. 461

EXHIBIT B

FEE AND COST SCHEDULE
Task Cost
Code Enforcement Officer $105.00/ hour
462
TO THE

QUALIFICATIONS TO PROVIDE

O N - C A L L C O D E

E N F O R C E M E N T S E R V I C E S

CITY OF ROLLING HILLS
Submitted November 28, 2022
463
134
10 12

APPENDIX
SECTION3
SECTION4
SECTION2
SECTION1
SECTION5

RESUMES

PROJECTEXPERIENCE

PERSONNEL

COVERLETTER

PROFILEOFTHEFIRM

WORKAPPROACH

TABLE OF CONTENTS
20 464

QUALIFICATIONS TO PROVIDE

ON-CALL CODE

ENFORCEMENT SERVICES
TO THE

CITY OF

ROLLING HILLS

COVER LETTER
SECTION 1
465
Engineering • Code Enforcement • Inspection • Plan Check • Planning 5140 Birch Street, Second Floor • Newport Beach, CA 92660 • Phone (949) 887-9432 402 West Broadway, Suite 400 • San Diego, CA 92101 • Phone (619) 595-4873 City of Rolling Hills November 28, 2022
Planning & Community Services Department
2 Portuguese Bend Road
Rolling Hills, CA 90274
Attn: John F. Signo, AICP
RE: Qualifications to Provide Code Enforcement Services.

Dear Mr. Signo,
4LEAF, Inc. (4LEAF) is excited to have the opportunity to submit our qualifications to provide professional Code Enforcement Services to the City of Rolling Hills. 4LEAF has been providing these services to numerous public and private clients throughout California for more than 21 years and is eager to provide these services to the City. Our Code Enforcement Division is our newest and fastest growing scope—we have grown our team to 30+ professionals and tripled our Code Enforcement clients in the course of the past year. 4LEAF is the ideal choice for the following reasons:

Local Presence
4LEAF has provided Code Enforcement Services to many clients throughout California, including the cities of Lomita, Hermosa Beach, and Signal Hill and the counties of Los Angeles, Riverside, and San Bernardino.

Team
4LEAF holds its employees in high regard and can ensure the City that all personnel have the knowledge, training, experience, and competencies to fulfill the roles and responsibilities of their assigned positions.

We are confident in the quality team we can provide to the City and guarantee high-quality service in conformity with your projects’ standards.
4LEAF staff have the experience working with property owners and other responsible parties to bring properties and conditions into compliance. Our Code Enforcement team is skilled in using processes including issuing administrative citations to establish whether violations of law exist on a property and ensuring compliance.

Scopes of Work
 Blight Enforcement
 Business License Enforcement
 Classroom Training with CEUs
 Community Outreach
 Department Assessments
 Hearing Officers
 Lead Paint Abatement
 Massage Parlor Enforcement
 Parking Enforcement
 Policy Review
 Program Analysis
 Program Development
 Project-Specific Assignments
 Rental Housing Enforcement
 Review and Develop SOPs
 Short-Term Rental Programs
 Staff Augmentation
 Stormwater Enforcement
 Subject-Matter Experts
 Substandard Housing
 Tobacco Enforcement
 Training Field Staff
 Vendor Enforcement
 Zoning Enforcement
466
Engineering • Construction Management • Inspection • Plan Check • Planning 5140 Birch Street, Second Floor • Newport Beach, CA 92660 • Phone (949) 887-9432 402 West Broadway, Suite 400 • San Diego, CA 92101 • Phone (619) 595-4873  Leadership
The contract with the City of Rolling Hills will be managed by Pete Roque and Ceci Muela, our Directors of Code Enforcement. Pete has 17+ years of industry experience, has served on several local, State, and national boards, has managed several Code Enforcement Divisions, and is an industry subject matter expert. Cecilia is also a Code Enforcement expert with 20+ years of experience, is a national Code Enforcement trainer for state, national, and international code enforcement organizations, and is the founder of Women Leaders in Code Enforcement (WLCE).

Both Pete and Cecilia have implemented policies and procedures in many jurisdictions as well as created needed text amendments to ensure that Code Enforcement departments, projects, and personnel have the proper tools to succeed. They will both be available to the City to discuss project needs, staff requests, and contractual details.

PM/Director of Code
Enforcement
PM/Director of Code
Enforcement
4LEAF
Local Office
Pete Roque
Office: (949) 877-9432
Mobile: (562) 569-0098
Email: [email protected]
Cecilia Muela
Office: (949) 877-9432
Mobile: (707) 479-9883
Email: [email protected]
5140 Birch Street, 2nd Floor
Newport Beach, CA 92660
Phone: (949) 877-9432
Website: 4LEAFINC.COM
We appreciate this opportunity to present our qualifications and look forward to hearing back from the City. Should you have any questions, please do not hesitate to contact us.

Respectfully submitted,
Cecilia Muela Pete Roque
Director of Code Enforcement Director of Code Enforcement 467

QUALIFICATIONS TO PROVIDE

ON-CALL CODE

ENFORCEMENT SERVICES
TO THE

CITY OF

ROLLING HILLS

PROFILE OF THE FIRM
SECTION 2
468
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 3 Section 2: Profile of the Firm November 28, 2022
SECTION 2: PROFILE OF THE FIRM
4LEAF, Inc. (4LEAF) is a California “C” Corporation that was established in 1999 and incorporated in 2001. Our extensive team of field staff, engineers, and managers are fully equipped with the training and experience needed to successfully provide complete services including Code Enforcement, Plan Check (on-site and virtual/remote), CASp, Inspections, Permit Technician assistance, professional development training, and other related professional and technical services to the City’s Community Development Department. Our goal is to set the industry standard for excellent customer service, and we have grown to more than 400 personnel throughout California, Arizona, Washington, Nevada, and New England. We are able to serve any full-time or part-time need the City may have, regardless of scope and duration.

Management Team
Office Locations
Bay Area - Headquarters
2126 Rheem Drive
Pleasanton, CA 94588
Southern California
5140 Birch Street, Second Floor
Newport Beach, CA 92660
San Diego
402 West Broadway, Suite 400
San Diego, CA 92101
Santa Cruz
701 Ocean Street
Santa Cruz, CA 95060
Sacramento
8896 North Winding Way
Fair Oaks, CA 95628
Paradise
6848 Skyway, Suite F
Paradise, CA 95969
Washington
1201 Pacific Avenue, Suite 600
Tacoma, WA 98402
4LEAF Consulting, LLC
125 E. Reno Ave., Suite 3
Las Vegas, NV 89119
New England
132 Central St., Suite 210
Foxboro, MA 02035
Professionals
4LEAF maintains the largest database of qualified personnel of varied qualifications.

Title # of Staff Title # of Staff
Code Enforcement Staff (PC832) 30+ ICC Certified Inspectors & Inspectors of Record 200+
ICC Certified Building Officials 40+ Registered Architects 5+ Registered Engineers (PE, SE) 20+ ICC Permit Technicians 60+ ICC Certified Plans Examiners 65+ CASp 12
Construction Managers/Inspectors 40+ Fire Plans Examiners & Inspectors 30+ President: Kevin Duggan
Phone: (925) 462-5959
Email: [email protected]
PM/Director of Code Enforcement: Pete Roque
Phone: (562) 569-0098
Email: [email protected]
PM/Director of Code Enforcement: Cecilia Muela
Phone: (707) 479-9883
Email: [email protected]
Director of Inspection: Mike Leontiades, CBO
Phone: (925) 681-8842
Email: [email protected]
469
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 3 Section 2: Profile of the Firm November 28, 2022
Company Mission
4LEAF strives to be the best firm by providing our clients with outstanding customer service and first-rate services. We put our philosophy into action by building client relationships and prioritizing the needs of our clients—this has led us to become the industry leader in providing Building and Safety Services to both public and private clients.

Our Code Enforcement Division is a scope we have been aggressively expanding in recent years and we have strategically advanced our team of professionals to further strengthen our project endeavors. Our Code Enforcement staff is dedicated to preserving and enhancing the quality of life for the residents in our client jurisdictions and work toward a goal of resolving problems efficiently and safely. Enforcing and upholding municipal codes (including weed and community preservation, unpermitted construction, unsafe property conditions, hazards to public health, and zoning) is of utmost importance to 4LEAF. Our Code Enforcement Division endeavors to improve communities through education, cooperation, and responsive enforcement.

We have the resources to deploy staff to any state and we have provided services all over the country. Our team is well-equipped and qualified to perform services for any project and in any location. By choosing 4LEAF, you are choosing a company that prides itself on quality work, top-notch customer service, experienced staff, and a multitude of project experience. Please review our scope of services and project examples in order to gain more understanding about our firm and how we can help achieve the City’s project goals.

Code Enforcement Scopes of Service
Below is a comprehensive chart of 4LEAF’s Code Enforcement services. We have detailed each scope of service in Section 3: Work Approach.

Blight Enforcement Parking Enforcement Staff Augmentation (all levels) Business License Enforcement Policy Review Stormwater Enforcement Classroom Training with CEUs Program Analysis Subject-Matter Experts Community Outreach Program Development Substandard Housing Department Assessments Project-Specific Assignments Tobacco Enforcement Hearing Officers Rental Housing Enforcement Training Field Staff Lead Paint Abatement Review and Develop SOPs Vendor Enforcement Massage Parlor Enforcement Short-Term Rental Programs Zoning Enforcement 470

QUALIFICATIONS TO PROVIDE

ON-CALL CODE

ENFORCEMENT SERVICES
TO THE

CITY OF

ROLLING HILLS

WORK APPROACH
SECTION 3
471
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 4 Section 3: Work Approach November 28, 2022
SECTION 3: WORK APPROACH
Our Code Enforcement personnel are certified through the International Code Council, CACEO, and various training programs offered through accredited institutions. In addition, most of our personnel hold a PC832, ICC Property Maintenance and Housing Inspector, and/or CACEO certification. 4LEAF staff have the experience in working cooperatively with property owners and other responsible parties to bring properties and/or conditions into compliance with applicable bodies of law. Our team will be able to determine when voluntary compliance is not forthcoming from property owners or responsible parties. 4LEAF staff has experience in investigative practices that aid in substantiating a complaint exists on a property and in turn address verified violations through proper due process noticing. 4LEAF Code Enforcement Officers have experience in writing criminal citations and in working with legal counsel to assist in the successful prosecution of Code Enforcement cases either in criminal or civil court when necessary. We focus on nearly every area of Code Enforcement including but not limited to the following categories detailed below.

SCOPE OF SERVICES & AREAS OF ENFORCEMENT
Blight Enforcement
Our team works to identify and enforce State and Local laws pertaining to the maintenance of private property.

Through field contact with tenants and property owners, our team works efficiently in providing guidance to address blighted conditions such as overgrown weeds, trash and debris, and graffiti.

Business License Enforcement
4LEAF is trained to identify businesses that operate without a required business license making them noncompliant with municipal code requirements.

Classroom Training with CEUs
You can often find members of 4LEAF training nationally for organizations such as the International Code Council (ICC), American Association of Code Enforcement (AACE), California Association of Code Enforcement Officers (CACEO), and other nationally recognized affiliations of these chapters. 4LEAF’s training leads include Cecilia Muela, Pete Roque, Nick Henderson, CBO, and Anthony Mullins. Our instructors are nationally accredited and offer Continuing Education Credits (CEUs). They currently cover training topics such as:
o Building Blocks for Code Enforcement Officer Success
o Building Inspections and Code Enforcement – A Powerful Duo 472
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 5 Section 3: Work Approach November 28, 2022
o Case Management from Start to Finish
o Effective Communications – Bridging the Gap with External and Internal Customers o IPMC 2021 or 2018 Exam Prep
o IPMC 2021 Overview
o Mold, Lead, Asbestos, & Vectors Enforcement
o Officer Safety – Drug Awareness for the Code Enforcement Officer o Officer Safety – Encountering Mental Illness in the field of Code Enforcement (Self-Care) o Officer Safety – Field Inspection Protocols for the Code Enforcement Officer o Officer Safety – Gang Awareness for the Code Enforcement Officer o Officer Safety – Hazardous Building Safety for the Code Enforcement Officer Community Outreach
4LEAF will review current outreach and engagement initiatives and make appropriate recommendations to the municipality. Items typically reviewed include:
o Opportunities for involvement in community events
o Creation of pamphlets and marketing material
o Social media engagement
o News media outlets
o Municipal Code Enforcement web page
o Review of frequently asked questions
Department Assessments
4LEAF is working with several Community Development Departments to provide assessments of their code units reviewing closely staffing levels, Standard Operating Procedures (including branding/rebranding, target issues, prioritization of existing code enforcement cases, community engagement strategies, written materials such as compliance notices, postings and door hangers, data entry, inspection response time management, and training programs. 4LEAF provides in-house assessments and regular meetings with directors and municipal stakeholders for plan implementation and execution.

Hearing Officers
4LEAF has Hearing Officers available for contracted municipalities. Our seasoned officers are trained to understand the existing Municipal Code as well as other adopted codes and make findings as to whether a violation exists. Results may include fines or granting additional time for compliance for respondents with unusual hardships.

Inspections
4LEAF can provide certified and qualified staff to perform inspections in a lawful manner that respects the reasonable expectations of privacy and security of residents and their properties. Inspections conducted will determine if conditions on the properties are compliant with applicable sections of the current editions of the International Property Maintenance Code (IPMC), Municipal Code, Zoning Code, California Health and Safety Codes, CA Residential Building Code, and trade codes.
473
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 6 Section 3: Work Approach November 28, 2022
Upon assignment, 4LEAF’s Code Enforcement staff will be ready to respond and provide compliance solutions to code compliance cases new and existing with minimal impact to current processes. 4LEAF Code Enforcement Inspectors are qualified to do the following:
o Perform inspections for violations of Building Codes and Ordinances as adopted by the municipality. o Research properties for prior approvals, permits, and general information relating to violations. o Investigate and take necessary action when a violation of municipal codes exists o Consult with the City Counsel as required, when requested by the Code Enforcement Manager/Director, and when escalated enforcement may be required.
o Comply with the municipality’s procedures for reporting inspection results and deficiencies. o Using municipal inspection correction forms.
o Making appropriate entries while resulting inspections, capturing case status communications, and login-in of notices sent to responsible parties.
o Conduct follow-up inspections as needed.
o Notify the responsible parties of other agency approvals prior to closing a code enforcement action. o Maintain records as needed for the efficient and effective operation of the municipality. o Meet with members of the general public and municipal staff on a daily basis as needed.

Lead Abatement
Although lead-based legislation has been around since the 1950s, nationwide regulation was not enforced until 1971 with the introduced of the Lead-Based Paint Poisoning Prevention Act (LBPPPA), which prohibited the use of leadbased paint in residential structures constructed or rehabilitated by the Federal government or with Federal assistance. In 1973, an amendment to the LBPPPA stated that lead-based paint should be removed from pre-1950 housing and structures. Our Code Enforcement team follows the requirements set forth by the State of California to ensure proper lead safe practices are taking place in removal of lead-based paint to protect citizens from exposure.

Additionally, our team participated at the National Healthy Homes Conference in 2022 in Baltimore, MD, where we spoke on the importance of Code Enforcement for Lead Paint Abatement Programs to safeguard communities.

Massage Parlor Enforcement
This scope can often be utilized for undercover stings with partnering agencies for businesses that not only violate criminal laws but also building code violations, licensing requirements, and potential massage parlor ordinances in the jurisdiction. Early detection is vital in these cases and steps include background checks and comparable effort applied. Our team has lead programs specializing in organizing and mitigating illegal actions in massage parlors.

Parking Enforcement
4LEAF has the capabilities of providing parking enforcement. This includes:
474
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 7 Section 3: Work Approach November 28, 2022
o Enforcement of State and municipal parking regulations. o Removal of abandoned and nuisance vehicles from the public right-of-way. o Issuance of parking citations and review of contested citations.

Policy Review
4LEAF shall review and read current policies and procedures and define policy clearly as it sets the tone for your municipality’s Code Enforcement Program. A clear policy communicates to everyone what is expected of them—whether it’s how they handle complaints, how Code Enforcement Officers conduct compliance reviews, or any other aspect that the municipality needs to have communicated and consistently followed. 4LEAF will develop a well-defined user-friendly format.

Program Analysis
4LEAF understands that Code Enforcement is an essential part of a community’s public health and safety, providing a regulatory mechanism to ensure the public’s overall wellbeing. Addressing the community’s concern in a timely and efficient manner is paramount to a successful Code Enforcement Program. 4LEAF personnel will perform the following:
o Conduct investigative inspections of unpermitted activities o Create standard operating procedure if required
o Conduct review of all administrative/misdemeanor citations o Provide guidance for resolution of high case load along commercial corridors o Assist with complex code enforcement cases
o Provide guidance for resolution of existing cases
o Provide field training if required
o Provide in-house training of traditional code enforcement protocols o Create an outreach plan to address and deter unpermitted vending/commercial corridor violations Program Development
4LEAF project managers have the experience in working cooperatively with our clients to further develop and enhance their Code Enforcement Program when requested. Our project managers are currently working with local jurisdictions to revamp and strengthen Code Enforcement Programs to gain voluntary compliance, provide resident education, and effectively communicate with the public. 4LEAF staff takes an approach in recommending, implementing, and executing program assessments, creation of policies and procedures, creation of training manuals for new hires, providing educational materials for the public, providing staff with up-to-date training, teaching current Code Enforcement staff options for compliance using adopted ordinances, and providing recommendations to cases that may require specialized expertise that may be sensitive in nature. 4LEAF staff also has designated staff tracking recent legislation to ensure the municipality follows state regulations and clients are aware of upcoming legislation that may affect their Code Enforcement Program.

Project-Specific Assignments
Our Code Enforcement Directors are often brought on board by municipalities to provide Code Enforcement consulting for on-going cases that need a fresh set of eyes and assessment. Our personnel can review current case files and compare that to the existing Municipal Code and Department’s Standard Operating Procedures. 475
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 8 Section 3: Work Approach November 28, 2022
Once the review is conducted, 4LEAF provides a report of our findings and our mitigation strategies related to that case. 4LEAF personnel is made available to speak with stakeholders such as Department Heads, Council, and other elected officials. If necessary, we can also provide Expert Witness Testimony.

Rental Housing Enforcement
Our team will assist with the inspection of residential rental properties on a routine and comprehensive basis to assure the overall quality of the rental meets the requirements of the Health and Safety Code and property maintenance guidelines. This includes educating property owners, property managers, and tenants about those requirements.

Review and Develop SOP’s
4LEAF routinely works with Code Enforcement Divisions to review the current Standard Operating Procedures and provide suggestions for enhancing SOP’s. Our staff can also help implement and train the existing municipal personnel in these changes. Currently, we are providing these services for California municipalities such as the cities of Napa, Lathrop, and Artesia.

Staff Augmentation
4LEAF specializes in providing personnel to municipalities on a part-time or full-time basis. We provide staff with training opportunities, study materials, company phones, and energy- saving fleet vehicles. 4LEAF’s Code Enforcement Staff Augmentation personnel categories include:
o Department Director
o Department Manager
o Senior Code Enforcement Officer
o Code Enforcement Officer II
o Code Enforcement Officer I
o Code Enforcement Coordinator
o Hearing Officer
Short-Term Rental Programs
One of the fastest growing programs within Code Enforcement Divisions is short-term rentals. 4LEAF assists with compliance with municipal short-term rental ordinances that require property owners to adhere to several rules including limiting the number of daytime and overnight guests, prohibiting events and amplified sound, and posting specific rules and emergency information, among others.

Stormwater Enforcement
4LEAF provides Stormwater Enforcement. This includes the visual inspection of infrastructure dedicated to the management of rainwater. Violations would include having inadequate erosion/sediment controls for property, failing to conduct/document inspections, illegal dumping, overgrowth of vegetation, and flooding. 476
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 9 Section 3: Work Approach November 28, 2022
Substandard Housing
One of the major areas of code enforcement throughout the U.S. is the inspection of Substandard Housing. 4LEAF Code Enforcement Officers routinely inspect and report any violations to housing codes including substandard and uninhabitable conditions, accumulation of trash and debris, lack of utilities, property maintenance, mold, and rodent/insect infestations.

Tobacco Enforcement
4LEAF has experience working within Tobacco Enforcement programs to ensure retailers are properly licensed/permitted for the sale of tobacco and such establishments are posting proper notification such as STAKE Act stickers at each point of sale. In addition, we can assist in compliance with work-place smoking and vaping prohibitions.

Field Staff Training
Aside from the classroom training, 4LEAF personnel is also available to conduct field training. This includes ridealongs with municipal personnel. This hands-on approach is often effective for training in communication, technical training, and enforcement of Municipal Codes.

Vendor Enforcement
4LEAF personnel are trained to enforce State and Local laws regarding unpermitted vending activity, issuance of Administrative Citations to vendors, generating inspection reports, testify at hearings, and provide strategic planning for large scale vending activities associated with entertainment venues. Often, this can include property the municipality owns or controls for areas such as vending like food or merchandise. This includes areas such as:
o Parks
o Public Right of Ways (such as sidewalks)
o Areas outside permitted Vending Locations
Zoning
4LEAF personnel can work with Departments to help determine whether project plans have been executed according to the conditions of approval for approved projects. Examples include:
o Construction of a building that is not allowed in a particular zoning designation. o Building a structure (or an addition to a structure) that is too tall or that obstructs another person’s view or access to light/air space.
o Conducting various operations in non-designated areas, including manufacturing, packaging, selling, growing, labeling, and other business/industrial activities. o Living in spaces that are not designated as residential areas. o Creating amounts of pollution or noise that exceed local limits. o Adherence to set back and lot coverage requirements.
477

QUALIFICATIONS TO PROVIDE

ON-CALL CODE

ENFORCEMENT SERVICES
TO THE

CITY OF

ROLLING HILLS

PERSONNEL
SECTION 4
478
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 10 Section 4: Personnel November 28, 2022
SECTION 4: PERSONNEL
As your consultant, 4LEAF understands that our role is to be an advocate on behalf of the City and represent the municipality’s best interests. 4LEAF’s team will function as an extension of your staff, seamlessly integrating with the personnel and practices established by the City while adding the perspective and expertise that only 4LEAF can offer. Our goal, which we have successfully accomplished on previous clients’ projects, is to have our staff integrate with yours and be accepted as an essential part of your team. 4LEAF will not utilize subconsultants and can provide full- or part-time personnel for this contract.

PROGRAM MANAGEMENT
Cecilia Muela – Project Manager/Director of Code Enforcement This contract will be co-managed by our Project Manager and Director of Code Enforcement, Cecilia Muela. Cecilia is a Code Enforcement expert with over 20 years of experience in the field and has served in the capacities of Assistant Chief Building Official, Code Enforcement Supervisor, and Building Inspector for multiple California public agencies. Cecilia is a national code enforcement trainer for state, national, and international code enforcement organizations. Cecilia is skilled in Code Compliance, Government, Emergency Management, Law Enforcement, Disaster Response, and Substandard Housing. Cecilia founded the Women Leaders in Code Enforcement Symposium (WLCE), which was created to promote a supportive learning environment for women in the building industry. Through training opportunities, networking, and connecting with fellow industry leaders, WLCE’s goal is to foster and support the ongoing development of women in current and future leadership roles.

Cecilia’s contact information:

Office – (949) 877-9432 | Cell – (707) 479-9883
Email – [email protected]
Pete Roque – Project Manager/Director of Code Enforcement This contract will be co-managed by our Project Manager/Director, Pete Roque.

Pete is a Code Enforcement expert with over 17 years of experience in the field and has served in the capacities of Code Enforcement Administrator, Code Enforcement Manager, and Community Development Inspector II for multiple California public agencies. With a demonstrated history of working in the government administration industry, Pete is skilled in Code Compliance, Government, Emergency Management, Law Enforcement, Disaster Response, and Plan Review.

Pete’s contact information:

Office – (949) 877-9432 | Cell – (562) 569-0098
Email – [email protected]
479
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 11 Section 4: Personnel November 28, 2022

PROJECT TEAM QUALIFICATIONS
4LEAF holds its employees in high regard and can ensure the City that all personnel have the knowledge, training, experience, and competencies to fulfill the roles and responsibilities of their assigned positions. Our team members are results- and detail-oriented and uphold the values of our company. Below is a quick look into 4LEAF’s Code Enforcement database. Our team includes:

Enforcement Staff Title Certifications
Pete Roque Director of Code Enforcement EPA Lead Renovation, Repair, & Painting, National Storm Water Inspector, Certified
Code Enforcement Officer, PC832
Cecilia Muela Director of Code Enforcement SAP Evaluator, International Lead Safety for Renovation, Repair, & Painting, PC832,
Certified Building Inspector, IPMC,
Certified Permit Technician
Rodrigo Ochoa-Reynoso Code Enforcement Officer/Inspector PC832 (Pending) Anthony Mullins Senior Code Enforcement Officer PC832, IPMC Mike Aguirre Code Enforcement Officer/Inspector PC832
Tom Cervantes Code Enforcement/Fire Inspector PC832
Erasmia Konstantopoulos Code Enforcement Officer PC832, IPMC (Pending) Jose Murillo Code Enforcement Officer/Inspector PC832, IPMC Al Fasulo Code Enforcement Officer PC832, Certified Code Enforcement Officer Nick Henderson, CBO Code Enforcement Officer/Inspector PC832 Doug Martin, CASp Code Enforcement Officer/Inspector PC832 JorDann Crawford Code Enforcement Officer PC832, IPMC (Pending) Leonard Powell Code Enforcement/Hearing Officer PC832, Certified Code Enforcement Officer, IPMC
Nina Hamilton Code Enforcement/Senior Inspector PC832 (Pending), Certified Code Enforcement Officer
John Juarez Senior Code Enforcement Officer PC832
Michael Legault Code Enforcement Officer/Inspector
PC832 (Pending), Certified Code
Enforcement Officer, IPMC
Andrea Nance Sevilla Code Enforcement Officer PC832
Milissa Hughes Code Enforcement Officer/Inspector PC832, Certified Code Enforcement Officer Noah Roque Code Enforcement Officer/Inspector Certified Code Enforcement Officer Eric Stephens Code Enforcement Officer/Inspector
PC832, Certified Code Enforcement
Officer, IPMC
Sarah Patton Code Enforcement Officer/Inspector CACEO Level I Jennifer Keleher Code Enforcement Officer/Inspector PC832 (Pending), IPMC (Pending) 480

QUALIFICATIONS TO PROVIDE

ON-CALL CODE

ENFORCEMENT SERVICES
TO THE

CITY OF

ROLLING HILLS

PROJECT EXPERIENCE
SECTION 5
481
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 12 Section 5: Project Experience November 28, 2022
SECTION 5: PROJECT EXPERIENCE
City of Lathrop
Code Enforcement and Building Department Services
Since 2015, 4LEAF has been working with the City of Lathrop in several capacities including Code Enforcement, Plan Review, Inspections, and Interim Chief Building Official to assist the community in helping its customers update their construction to maintain compliance with the current codes, especially those who did not go through a formal permitting process. 4LEAF is assisting Lathrop with Municipal, Zoning, and Building Codes on public and private property throughout the City. Code Enforcement works to administer a fair and unbiased enforcement program, improve the overall appearance of the City, and works with residents, neighborhood associations, public service agencies, and other City departments to facilitate voluntary compliance with City codes, and correct municipal code and land use violations.

Code Enforcement Department Assessment
4LEAF is currently working with the Department Director to evaluate and develop the Code Enforcement Division’s Standard Operating Procedures to ensure enforcement is able to be carried out per the City’s Municipal Code. This includes the development of enforcement strategies and materials crucial to daily activities. Pete is focusing on several areas of enforcement, including:
• Abandoned Vehicles
• Air Pollution
• Graffiti
• Noise Complaints
• Standing Water / Water Waste
• Public Nuisance Violations
• Field Training Existing Staff
Building Department Consulting
In addition to Code Enforcement, 4LEAF has also provided as-needed consulting services to the City of Lathrop’s Building Division. 4LEAF has provided such services as:
• Interim Building Official Services
• Staff Augmentation for Building Inspection and Permit Technicians • Off-Site Plan Checking Services
Client Name: City of Lathrop
Project Location: Lathrop, CA
Client Contact: Teresa Vargas, City Manager
Client Address: 390 Town Centre Drive / Lathrop, CA 95330 Client Phone: (209) 941-7229
Contact Email: [email protected]
482
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 13 Section 5: Project Experience November 28, 2022
City of Santa Rosa
Code Enforcement
4LEAF provides the City of Santa Rosa with two full-time Code Enforcement Officers, Milissa Hughes and Eric Stephens, to perform as-needed services for the City. The City’s Code Enforcement Division is dedicated to working in partnership with residents, tenants, landlords, and business owners to promote and maintain a safe and desirable living and working environment.

Additionally, the Division is responsible for ensuring that City codes are implemented on private property to address general health, life, fire, and safety issues facing residents.

A large undertaking includes an assignment to review 200+ backlog cases involving files that had fallen through City cracks due to officer resignations/retirees or were not re-assigned to other officers. Milissa works with the City’s Senior Code officer to determine which cases can be closed or if an updated letter must be sent to the owner for follow up.

Additional responsibilities for this project include updating the City’s database with notes and creating notices to be mailed to the property owner or tenant. Case violations consist of construction without obtaining permits (garage conversions, remodel, electrical, plumbing), expired permits, cannabis grows, substandard conditions, non-operable vehicles, trash/debris, site planning, historical landmark alterations, etc.

An additional assignment for the City that began in September 2022 includes addressing short-term rentals (STR), which entails on-call (24-hour) and after-hour response, processing a backlog of 100+ STR cases, addressing new cases and complaints, data collection, and issuing citations (30+ to date).

Common violations our Code Enforcement Officers address for as-needed services include the following:
• Animal violations
• Unpermitted work
• Cannabis cultivation
• Graffiti
• Home business
• Overgrown vegetation
• Signs
• Short-term rentals
• Substandard housing
• Vehicle storage
By working together with the community, 4LEAF and the City’s Code Enforcement team help reduce crime, protects the health and well-being of residents, helps maintain property values, and preserves and enhances our community for future generations.

Client Name: City of Santa Rosa
Project Location: Santa Rosa, CA
Client Contact: Maraskeshia Smith, City Manager
Client Address: 100 Santa Rosa Avenue / Santa Rosa, CA 95404 Client Phone: (707) 543-3030
Contact Email: [email protected]
483
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 14 Section 5: Project Experience November 28, 2022
City of Rohnert Park
Code Enforcement, Plan Review, Inspection, Planning, Permitting, and Building Official Services Since 2019, 4LEAF has been working with the City of Rohnert Park in several capacities including Code Enforcement, Plan Review, Inspections, Planning, Permitting, and Interim Chief Building Official to assist the community in helping its customers update their construction to maintain compliance with the current codes, especially those who did not go through a formal permitting process.

The City’s Code Compliance Division works with the community to ensure that the intent of the City’s Zoning, Building, and Nuisance Abatement Ordinances are consistently met. 4LEAF’s goal is to help the City maintain a healthy, safe, and clean environment and preserve the quality of life for residents and businesses. 4LEAF works in partnership with the City, its citizens, and business owners to ensure the City remains safe and compliant.

We have two dedicated Code Enforcement Officers, JorDann Crawford and Jennifer Keleher, and one Senior Code Enforcement Officer, Cecilia Muela, performing services at the City on an as-needed basis. Our Code Enforcement services include:
• Working with Code Compliance Officers from the City to help with their caseload, including researching and doing background checks on a property to determine next steps. • Performing inspections, writing inspection reports, and generating notices of violation. • Working with other departments within the city.
• Providing direction to constituents to help them come into compliance. • Working with the Building Department to ensure we are giving accurate information about permits. • Working with permit technicians on open code cases.
• Data entry for compliance cases
Building Department Consulting
In addition to Code Enforcement, 4LEAF has also provided as-needed consulting services to the City of Rohnert Park’s Building Division. 4LEAF has provided such services as:
• Interim Building Official Services
• Combination Building Inspection Services (Residential and Commercial) • Off-Site Plan Checking Services
• Permit Technician Services
Client Name: City of Rohnert Park
Project Location: Rohnert Park, CA
Client Contact: Mary Grace Pawson, Development Services Director Client Address: 130 Avram Avenue / Rohnert Park, CA 94928 Client Phone: (707) 588-2226
Contact Email: [email protected]
484
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 15 Section 5: Project Experience November 28, 2022
City of Newark, CA
Code Enforcement, Building Department, and Planning Department Services Since 2016, 4LEAF has been working with the City of Newark in several capacities including Code Enforcement, Plan Review, Inspections, Interim Chief Building Official, Fire Review, Public Works, and Permitting to assist the community in helping its customers update their construction to maintain compliance with the current codes, especially those who did not go through a formal permitting process.
4LEAF provides Code Enforcement Officer Nina Hamilton to perform Code Enforcement Inspection services for the City. The City of Newark Community Preservation Division operates under the Community Development Department and is comprised of Community
Preservation Specialists who are responsible for enforcing the provisions of the Newark Municipal Code and various other related codes and policies. 4LEAF assists with this endeavor while assisting with code enforcement response for a backlog of cases that remained in cue.

Building Department Consulting
In addition to Code Enforcement, 4LEAF has also provided as-needed consulting services to the City of Newark’s Building Division. 4LEAF has provided such services as:
• Interim Building Official Services
• Combination Building Inspection Services (Residential and Commercial) • On-Site Plan Checking Services
• Off-Site Plan Checking Services
• Permit Technician Services
Planning Department Consulting
4LEAF is currently providing an Associate Level Planner full-time (Waqar Shah) to the City of Newark who works seamlessly with the Planning Director and other members of the Planning Division on a number of different Planning Projects throughout the City.

Client Name: City of Newark
Project Location: Newark, CA
Client Contact: Steven Turner, Community Development Director Client Address: 37101 Newark Blvd. / Newark, CA 94560
Client Phone: (510) 578-4330
Contact Email: [email protected]
485
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 16 Section 5: Project Experience November 28, 2022
City of San Pablo, CA
Code Enforcement, Plan Review, Inspection Services, and Chief Building Official For the past 4 years, 4LEAF has been working with the City of San Pablo in several different capacities including Code Enforcement, Plan Review, Inspections, and Interim Chief Building Official to assist the community in helping its customers update their construction to maintain compliance with the current codes, especially those who did not go through a formal permitting process.

Housing Program – Code Enforcement
4LEAF is currently providing inspection and project administration support services to City of San Pablo residents who have completed work without going through a formal permitting process. Through strong organization and effective communication, the community has been receptive to getting their properties up to the current codes and standards and avoiding construction hazards. Both of our Inspectors are working diligently to maintain a database of cases and track permitting progress on properties that need inspections to verify their property meets the current residential health and safety code and the current adopted California Building Codes. Our Project Administrator works both on-site and off-site coordinating, managing, and assigning inspections regarding this program.

Interim Chief Building Official
4LEAF has provided the City with an Interim Chief Building Official for more than two years in this capacity. 4LEAF’s Building Official routinely performs Plan Reviews and Inspections on large commercial and important City projects.

Building Department Consulting
4LEAF provides all the inspection services for the City to include residential and commercial inspections for all trades including Building, Mechanical, Electrical, and Plumbing. 4LEAF personnel is responsible for inserting all the inspection results into the City’s permitting system CRW. In addition, 4LEAF has helped manage up to 2 Permit Technicians, 1 Building Inspector, and 3 Permit Technicians.

Client Name: City of San Pablo
Project Location: San Pablo, CA
Client Contact: Charles Ching, Assistant CM
Client Address: 13831 San Pablo Ave., San Pablo
Client Phone: (510) 215-3031
Contact Email: [email protected]
486
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 17 Section 5: Project Experience November 28, 2022
County of San Benito, CA
Code Enforcement (Amnesty Program), Plan Review, Inspection, and Chief Building Official 4LEAF has been serving the County of San Benito providing as-needed Building Inspection, Code Enforcement, Plan Review, Public Works Inspections, and serving as the Interim Chief Building Official. San Benito County, located in the Coast Range Mountains, encompasses approximately 1,400 square miles with a population of more than 59,000. 4LEAF reviews and inspects several projects including several housing tracts and miscellaneous commercial projects.

Code Enforcement Services
4LEAF is currently providing Code Enforcement, Inspection, and Project Administration Support services to San Benito County residents who have completed work without going through a formal permitting process. Through strong organization and effective communication, the community has been very receptive to getting their properties up to the current codes and standards and avoiding life-safety construction hazards to the community. 4LEAF has provided as many as two Code Enforcement Officers who focus on a variety of Code Enforcement cases throughout the County.

Project Highlight – Panoche Valley Solar Project
4LEAF performed the inspections of the $1 Billion Panoche Valley Solar Project on behalf of the County of San Benito. Panoche Valley Solar, LLC (PVS) is the owner of the Panoche Valley Solar Project, located in southeastern San Benito County, California.

PVS is committed to the reduction of greenhouse gases through increasing renewable energy generation and reducing the use of fossil fuels (coal and natural gas). Once complete, the project will help generate clean energy for the local community, helping California meet its renewable energy goals and responsibly protect its native environment. Construction began summer 2016 and is expected to create up to 500 direct and indirect construction jobs.

PVS has developed a precedent setting conservation plan in cooperation with biologists, conservationists, and wildlife agencies. PVS has acquired over 25,000 acres of conservation land that is critical to the recovery of regionally protected species and habitats. These conservation lands will be protected under a Conservation Easement and managed in perpetuity.

Client Name: County of San Benito
Project Location: Hollister, CA
Client Contact: Benny Young, Director
Client Address: 2901 Technology Blvd, Hollister
Client Phone: (831) 637-5313
Contact Email: [email protected]
487
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 18 Section 5: Project Experience November 28, 2022
City of Pinole, CA
Code Enforcement, Plan Review, Inspection, and Chief Building Official 4LEAF has been working with the City of Pinole in several capacities including Plan Review, Code Enforcement Programs, Inspections, and providing an Interim Chief Building Official. These services assist the community in updating their construction to be in compliance with the current codes, especially for residents who did not go through a formal permitting process.

Housing Program – Code Enforcement
4LEAF is currently providing inspection and project administration support services to residents of the City who have completed work without going through a formal permitting process. Through strong organization and effective communication, the community has been very receptive to getting their properties up to the current codes and standards and avoiding life-safety construction hazards to the community. Both our Inspectors are working diligently to maintain a database of cases and track permitting progress on properties that need inspections to verify their property meets current residential health and safety code and the adopted California Building Codes.

Weed Abatement Program
4LEAF provides pro-active inspection support for the Weed Abatement Program during the high-fire season. Our weed abatement inspector ensures that requirements of the Weed Abatement Program are being met and provides notices as required for those properties in violation thereof.

Interim Chief Building Official
4LEAF provided the city with an Interim Chief Building Official. Lucas Chapman, CBO was with the City of Pinole on behalf of 4LEAF for more than one year. Lucas routinely performed plan reviews and inspections on large commercial and important City projects. Lucas also helped manage up to two Permit Technicians and one Building Inspector.

CRW Permitting System Automation
4LEAF recently provided the City of Pinole with Administration assistance for the upgrades to their CRW Permitting System. Our staff helped organize and administer workarounds to allow staff to successfully navigate the permitting system, integrate with other departments, and interface with the community to process permits in a reasonable time frame.

Client Name: City of Pinole
Project Location: Pinole, CA
Client Contact: Tamara Miller, Public Works Director
Client Address: 2131 Pear St, Pinole, CA 94564
Client Phone: (510) 724-9010
Contact Email: [email protected]
488
Qualifications to Provide Code Enforcement Services to the City of Rolling Hills Page 19 Section 5: Project Experience November 28, 2022
County of San Mateo, CA
Second Unit Amnesty Program – Code Enforcement Services 4LEAF was selected to provide Program Management, Code Enforcement, Inspection, and Plan Review Services for the County of San Mateo residents who have completed work without going through a formal permitting process. In July 2018, 4LEAF was awarded the contract for San Mateo County’s Second-Unit Amnesty Program.

In a collaborative effort to balance safety with California’s desperate need for more housing, the County implemented the Amnesty Program, along with a financial loan program, to promote the legalization of unpermitted second units, bringing them up to the current codes to avoid life-safety construction hazards. Steps of the program include but are not limited to:

1. Performing the initial inspection and determines the required scope of work along with an estimate and submits the findings to the applicant and County.

2. Determining if client wishes to proceed with the Amnesty Program based on findings of the inspection report and estimated cost conformance.

3. Providing a minimum of two contractor estimates from licensed contractors.

4. County sends 4LEAF the completed application, submitted plans, agreement of timeline, and scope of work.

5. Uploading the submitted plans and documents into 4LEAF’s EZPlan Review and performing the plan review with a maximum 5-day turnaround.

6. Performing the requisite inspections after permit is issued from the County. Coordinating each inspection with the contractor and the applicant through 4LEAF’s Program Manager.

7. Monitoring the progress throughout the project and provides the Program Manager with updates, correction notices, and approvals. This information is uploaded and tracked in EZPlan Review portal.

8. Upon completion of the work, 4LEAF sends a letter of recommendation to the County stating an Amnesty Compliance Certificate be issued to the Applicant.
4LEAF and the County work together to maintain a database of cases and track permitting progress on properties that need inspections to verify if the property meets current residential health and safety codes and the current adopted California Building Codes.

Client Name: County of San Mateo
Project Location: San Mateo, CA
Client Contact: William Gibson, Project Planner
Client Address: 555 County Center, 2nd Floor
Client Phone: (650) 363-1816
Contact Email: [email protected]
489
Qualifications to Provide Code Enforcement, Community Development, Public Works, and Fire Services to the City of Rolling Hills. Page 53 Section 4: Fee Schedule January 31, 2022
2022-2023 FEE SCHEDULE & BASIS OF CHARGES

FOR THE CITY OF ROLLING HILLS
All Rates are Subject to Basis of Charges

PLAN REVIEW COST STRUCTURE NOTES
Complete Plan Review Percentage Cost: 70%
Partial Review (Structural and Non-Structural): 40%
Hourly Plan Review: $140 Non-Structural Review
$160 Structural Review
Fee includes:
➢ Initial review and two (2) rechecks. Hourly
charges apply after three (3) or more rechecks.
➢ Shipping, courier, and electronic service.

Code Enforcement
Project Manager...............................................................................................................................$180/hour Director of Code Enforcement .........................................................................................................$170/hour Senior Code Enforcement Officer.....................................................................................................$125/hour Code Enforcement Officer................................................................................................................ $105/hour Administrative Support ....................................................................................................................$80/hour Building & Fire
Permit Manager..................................................................................................................................$120/hour Senior Permit Technician....................................................................................................................$100/hour Permit Technician...............................................................................................................................$90/hour Clerk/Administrator............................................................................................................................$70/hour Chief Building Official .........................................................................................................................$170/hour Senior Combination Building Inspector (Building Inspector III) .........................................................$135/hour Commercial Building Inspector (Building Inspector II) ......................................................................$115/hour Residential Building Inspector (Building Inspector I)..........................................................................$105/hour Civil Plan Review (Grading, Improvement Plans) ...............................................................................$170/hour Structural Plan Review Engineer ........................................................................................................$160/hour Non-Structural Plans Examiner ..........................................................................................................$140/hour Fire Prevention Officer ......................................................................................................................$155/hour Fire Protection Engineer (FPE)............................................................................................................$205/hour Fire Plans Examiner ............................................................................................................................$145/hour Fire Inspector II...................................................................................................................................$125/hour Fire Inspector I....................................................................................................................................$115/hour Inspector of Record ............................................................................................................................$160/hour Public Works Inspector.......................................................................................................................$155/hour DSA Class 1 / OSHPD A Inspector .......................................................................................................$155/hour DSA Class 2 / OSHPD B Inspector .......................................................................................................$115/hour DSA Class 3 / OSHPD C Inspector........................................................................................................$105/hour Certified Access Specialist (CASp).......................................................................................................$170/hour GoFormz Software.................................................................................................................. $50/user monthly Hourly overtime charge per inspector .....................................................................................1.5 x hourly rate Mileage (for inspections performed within the City).................................................................. IRS Rate + 20% 490
Qualifications to Provide Code Enforcement, Community Development, Public Works, and Fire Services to the City of Rolling Hills. Page 54 Section 4: Fee Schedule January 31, 2022
Planning
Principal-in-Charge ...........................................................................................................................$275/hour Housing Policy Director ....................................................................................................................$220/hour Planning Director..............................................................................................................................$200/hour Principal/Planning Manager.............................................................................................................$170/hour Senior Planner ..................................................................................................................................$155/hour Associate Planner .............................................................................................................................$135/hour Assistant Planner .............................................................................................................................$110/hour Senior Planning Technician...............................................................................................................$100/hour Planning Technician..........................................................................................................................$90/hour BASIS OF CHARGES – BUILDING & FIRE
Rates are inclusive of “tools of the trade” such as forms, telephones, and consumables. • All invoicing will be submitted monthly.
• Staff Augmentation work (excluding plan review) is subject to 4-hour minimum charges unless stated otherwise. Services billed in 4-hour increments.
• Most plan reviews will be done in 10 business days or less and 5 business days or less for re-checks. This is not inclusive of holidays or the day of the pick-up of plans. • Expedited reviews will be billed at 1.5x the plan review fee listed in the fee schedule. Return time will be within seven (7) days of receipt of the plans from the City. • Plan review of deferred submittals & revisions will be billed at the hourly rates listed. • All plan review services will be subject to a $250.00 minimum fee if percentage-based fee or two (2) hour minimum charge if hourly rates apply.
• Larger complex plan reviews can be negotiated to achieve the best possible pricing. 4LEAF has a proven track record of working with municipalities to provide expedited reviews with discounted pricing when applicable.
• 4LEAF assumes that these rates reflect the 2022-2023 contract period. 3% escalation for 2024-2025 and 2025-2026 is negotiable per market conditions.
• Overtime and Premium time will be charged as follows:
- Regular time (work begun after 5AM or before 4PM) 1 x hourly rate - Nighttime (work begun after 4PM or before 5AM) 1.125 x hourly rate - Overtime (over 8-hour M-F or Saturdays) 1.5 x hourly rate - Overtime (over 8 hours Sat or 1
st 8-hour Sun) 2 x hourly rate
- Overtime (over 8 hours Sun or Holidays) 3 x hourly rate • Overtime will only be billed with prior authorization of the Director or other designated City personnel. • All work with less than 8 hours rest between shifts will be charged the appropriate overtime rate. • Mileage driven during the course of Inspections will be charged at cost plus 20%. • Payment due on receipt. All payments over 30 days will be assessed a 1.5% interest charge. • Client shall pay attorneys’ fees, or other costs incurred in collecting delinquent amounts. • Client agrees that 4LEAF’s liability will be limited to the value of services provided. 491
Qualifications to Provide Code Enforcement, Community Development, Public Works, and Fire Services to the City of Rolling Hills. Page 55 Section 4: Fee Schedule January 31, 2022
BASIS OF CHARGES – PUBLIC WORKS
• Rates shown assume the projects will require compliance with California Prevailing Wage rate requirements and assumes the Client will be filing a PWC-100 Form to the California Department of Industrial Relations (DIR) for the projects.
• Rates for prevailing wage categories are subject to annual escalations in accordance with the bi-annual wage determinations from the California DIR.
• Per the new requirements being enforced under SB 854 and because it is assumed that a PWC-100 Form will be filed by the Client to the CA DIR for each project, 4LEAF is required to notify an authorized Apprenticeship Committee through submittal of a DAS-140 form. We are then required to make an official request to an authorized Apprenticeship Committee for an apprentice by submitting a DAS-142 form. We are not assured the apprenticeship committee will be able to provide a suitable / qualified apprentice for the project. Per the apprenticeship requirements, the hours worked by the apprentice must be in a ratio of 1:5 for apprentice to journeyman hours. 4LEAF will not know the labor classification of the Public Works Apprentice until an Apprentice is dispatched to the site; therefore, the rates for the five Periods listed under the California DIR’s Wage determination for Building Construction Inspector were used to determine the range of hourly rates for Public Works Inspector Apprentice. • Pre-approved Overtime and Premium hours for labor categories subject to Prevailing Wage requirements will be charged per the following:
- Nighttime (work begun after 4PM or before 5AM) 1.125 x hourly rate - Overtime (over 8 hour M-F or Saturdays) 1.35 x hourly rate - Overtime (over 8 hours Sat or 1st 8 hour Sun) 1.85 x hourly rate - Overtime (over 8 hours Sun or Holidays) 2.35 x hourly rate • All invoicing will be submitted monthly.
• All work with less than 8 hours rest between shifts will be charged the appropriate overtime rate. • Subconsultant Invoices will be assessed a 10% Administrative Processing Fee. • Project-related mileage for inspections will be billed at the allowable IRS Rate. • Payment due on receipt. All payments over 30 days will be assessed a 1.5% interest charge. • Client shall pay attorneys’ fees, or other costs incurred in collecting delinquent amounts. • Client agrees that 4LEAF’s liability will be limited to the value of services provided. 492
Agenda Item No.: 14.A
Mtg. Date: 01/09/2023
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: JOHN SIGNO, DIRECTOR OF PLANNING & COMMUNITY SERVICES THRU: ELAINE JENG P.E., CITY MANAGER
SUBJECT: FIRE FUEL ABATEMENT AND CODE ENFORCEMENT QUARTERLY REPORT FOR THE FOURTH QUARTER OF 2022 (OCTOBER 1
THROUGH DECEMBER 31)
DATE: January 09, 2023
BACKGROUND:

The Code Enforcement division provides quarterly updates on fuel abatement cases which consist of active and closed cases. The attachments show active and closed cases consisting of dead vegetation and other code violations for the fourth quarter of 2022. Also included is a list of open cases.

DISCUSSION:

During the fourth quarter of 2022, there were a total of 24 cases closes, including 20 dealing with vegetation or dead trees; 17 cases were opened, including 8 involving vegetation or dead trees. In total, code enforcement is working on 19 open cases, of which 6 deal with vegetation or dead trees.

Willdan Engineering has been providing code enforcement services since March 2022. The contract with Willdan Engineering terminated on December 31, 2022. Last month, Willdan Engineering was focused on closing cases and opened very few cases. Enforcement on dead vegetation has slowed during the winter months because deciduous trees lose their leaves and identifying a dormant tree from a dead tree can be difficult. Currently, code enforcement is being handled internally until a replacement is found. Enforcement on vegetation should increase in warmer months when dead trees are easier to identify and a new code enforcement officer is on board.

The Code Enforcement Division is continuing to use iWorQ to generate quarterly updates and track code enforcement and fire fuel abatement cases. Those reports are attached.

FISCAL IMPACT:

Code enforcement services is provided contractually and payment is made from the General Fund.
493
RECOMMENDATION:

Receive and file.

ATTACHMENTS:

CE_QRP_2022_Q4_Opened_Cases.pdf
CE_QRP_2022_Q4_Closed_Cases.pdf
CE_QRP_2022_Q4_Cumulative_Open_Cases.pdf
494
Page: 1 of 1
4th Qtr. 2022
Opened Cases
10/01/2022 - 12/31/2022
Case
Opened
Address of Violation Description Status
12/27/2022 52 Portuguese Bend Rd Unpermitted Construction Open 12/13/2022 21 Portuguese Bend Rd Broken Fence Open
12/8/2022 4 Possum Ridge Rd Dead tree Closed
11/8/2022 69 Portuguese Bend Rd Unpermitted structure (chicken coop) built w/o approval and permits
Open
11/7/2022 12 Ringbit Road East Bathroom remodel without permits; C&D permit required
Open
11/3/2022 20 Chuckwagon Road New Retaining Wall without Permits, Dead Pine Tree.

Open
11/1/2022 2950 Palos Verdes Drive Dry Noxious Growths and Trash Open 10/27/2022 28 Chuckwagon Road Dead Tree in Rear Yard Closed 10/12/2022 64 Portuguese Bend Road Large event with lights and music Open 10/20/2022 74 Portuguese, CA Complaint of lights and blue car with trailer parked on the property.

Closed
10/18/2022 2 Possum Ridge Complaint of 2-3 bright lights on the property.

Closed
10/13/2022 7 Crest Road West Exploratory borings without permit; Excavation, Soil Testing
Closed
10/4/2022 15 Upper Blackwater Canyon Rd Dead Trees & Discarded Tree Trimmings Open 10/4/2022 0 Pine Tree Ln Dead/Dry Brush Closed
10/4/2022 5 Pine Tree Ln Dead/dry brush. Closed
10/4/2022 7 Pine Tree Ln Dead Tree Closed
10/4/2022 APN7569-013-018 (Pine Tree Ln.) Dead tree and discarded tree branches. Closed Total Records: 17 1/4/2023
495
Page: 1 of 1
4th Qtr. 2022
Closed Cases
10/01/2022 - 12/31/2022
Case
Opened
Address of
Violation
Description Status Case Closed
12/8/2022 4 Possum Ridge Rd Dead tree Closed 12/27/2022 11/7/2022 12 Ringbit Road East Bathroom remodel without permits; C&D permit required
Closed 12/21/2022
8/30/2022 3 Eastfield Dr Dead Tree Closed 12/13/2022
9/20/2022 6 Possum Ridge Rd Dead Tree Closed 12/8/2022
10/4/2022 0 Pine Tree Ln Dead/Dry Brush Closed 12/6/2022 10/4/2022 5 Pine Tree Ln Dead/dry brush. Closed 12/6/2022 9/22/2022 11 Middleridge Ln S Dead/diseased vegetation Closed 12/6/2022 8/25/2022 23 Crest Road East Dead Tree Closed 12/6/2022 9/20/2022 1 Crest Rd W Dead Trees Closed 12/1/2022
10/4/2022 7 Pine Tree Ln Dead Tree Closed 11/29/2022
9/20/2022 1 Morgan Ln Dead Tree Closed 11/29/2022
9/20/2022 27 Buggy Whip Dr Dead Tree Closed 11/29/2022
9/20/2022 20 Buggy Whip Dr Dead Vegetation Closed 11/29/2022 8/30/2022 1 Eastfield Dr. Dead Vegetation Closed 11/29/2022 10/4/2022 APN: 7569-013-018 Dead tree and discarded tree branches. Closed 11/22/2022 9/22/2022 2 Acacia Ln. Dead shrubs/vegetation Closed 11/22/2022 9/22/2022 15 Middleridge Ln N Dead/dry palm fronds. Closed 11/22/2022 10/27/2022 28 Chuckwagon Road Dead Tree in Rear Yard Closed 11/18/2022 9/20/2022 8 Buggy Whip Dr Damaged Fence & Dead Vegetation Closed 11/3/2022 10/13/2022 7 Crest Road West Exploratory borings without permit; Excavation, Soil Testing
Closed 11/2/2022
8/11/2022 16 Buggy Whip Drive Trees in violation of condition Closed 11/2/2022 9/6/2022 6 Morgan Ln. Dead/Discarded Vegetation (Trimmings) Closed 11/1/2022 10/20/2022 74 Portuguese, CA Complaint of lights and blue car with trailer parked on the property.

Closed 10/25/2022
10/18/2022 2 Possum Ridge Complaint of 2-3 bright lights on the property. Closed 10/25/2022 Total Records: 24 1/4/2023
496
Page: 1 of 1
Cumulative Open
Cases
Cumulative Open Cases
Case Opened Address of Violation Description Status
12/27/2022 52 Portuguese Bend Rd. Unpermitted Construction Open 12/13/2022 21 Portuguese Bend Rd Broken Fence Open
11/8/2022 69 Portuguese Bend Rd Unpermitted structure (chicken coop) built w/o approval and permits
Open
11/3/2022 20 Chuckwagon Road New Retaining Wall without Permits, Dead Pine Tree.

Open
11/1/2022 2950 Palos Verdes Drive Dry Noxious Growths and Trash Open 10/12/2022 64 Portuguese Bend Road Large event with lights and music Open 10/4/2022 15 Upper Blackwater Canyon Rd Dead Trees & Discarded Tree Trimmings Open 9/22/2022 29 Middleridge Ln S Extensive grading and importing of soil. Dead shrubs/trees/vegetation on the property (visible
from the road).

Open
8/16/2022 24 Portuguese Bend Road Dead Trees Open
8/16/2022 1 Sagebrush Lane Dead Trees Open
7/7/2022 7 Crest Rd. West Unpermitted construction to the interior of resident
Open
6/9/2022 4 Spur Ln Dead/Dry vegetation Open
5/17/2022 5 Sagebrush Ln Unpermitted Construction Open
11/23/2021 2 Acacia Lane Unpermitted replacement of roof on guest house, unpermitted demolition of pool deck, and
no C&D permit.

Open
7/6/2021 1 Chestnut Lane Illegal structure, CUP/SPR needed Open 6/3/2021 1 Hackamore Road Illegal construction, unpermitted. Open 4/21/2021 2 Buggy Whip Drive broken fence and trash Open 6/24/2020 61 Eastfield Drive Grading and Drainage Open