HICKORY STREET
130
135
140
145
150
155
160
165
170
130
135
140
145
150
155
160
165
170
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 15" VCP S: 0.50%
15" VCP S: 0.50%
15" VCP S: 0.50%
15" VCP S: 0.50%
SSMH C04-214A
STA: 11+66.56
15" INV IN: 140.44 (E)
6" INV IN: 147.60 (NE)
8" INV IN: 146.85 (S)
15" INV OUT: 140.34 (W)
RIM: 151.64
SSMH C04-215A
STA: 14+10.56
15" INV IN: 141.76 (E)
6" INV IN: 146.57 (NE)
15" INV OUT: 141.66 (W)
RIM: 151.84
SSMH C04-216A
STA: 16+51.40
15" INV IN: 143.06 (E)
6" INV IN: 145.83 (N)
6" INV IN: 151.73 (SE)
15" INV OUT: 142.96 (W)
RIM: 156.53
SSMH C04-217A
STA: 18+91.39
15" INV IN: 144.36 (E)
8" INV IN: 149.05 (N)
15" INV OUT: 144.26 (W)
RIM: 155.07
STA: 10+80.8± - EXST 30" SD
ELEV: 146.3±
STA: 12+99.5± - EXST 12" SD
ELEV: 148.5±
STA: 12+74.6± - EXST 6" SD
ELEV: 147.7±
STA: 10+39.3± - EXST 12" SD
ELEV: 147.6±
STA: 10+11.5± - EXST 24" W
ELEV: 144.8±
STA: 10+20.6± - EXST 6" SS
ELEV: 141.7±
STA: 10+37.1± - EXST 6" W
ELEV: 144.9±
EXST
EXST
C04-203
STA: 19+93.89
14" INV IN: 144.97 (N)
15" INV OUT: 144.87 (W)
10" INV OUT: 144.92 (E)
RIM: 154.54
STA: 13+49.5± - EXST 4" SS
STA: 15+63.8± - EXST 4" SS
STA: 15+66.9± - EXST 4" SS
STA: 18+02.8± - EXST 4" SS
STA: 18+69.0± - EXST 4" SS
STA: 19+28.9± - EXST 4" SS
SSMH-01 (NEW)
STA: 10+00.00
15" INV IN: 139.50 (E)
21" INV IN: 139.33 (N)
21" INV OUT: 139.33 (S)
RIM: 150.01
SEE NOTE 7

EXST TO BE
CAPPED
15" VCP S: 0.50%
EX 10" SS TO BE

CAPPED FOR

CONTINUATION,
SEE DWG C-04

EX SS TO BE

DEMOLISHED
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-02.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-02.DWG 10:57:384/22/24
C-02

CIVIL A CORREA
B. DALEY

K ALACON

K ALACON

HICKORY ST

PLAN AND PROFILE
10+00 TO 20+50
23-056
9 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT

MANDATORY

OPEN CUT
SEE NOTE 6
AND 8
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR DEVELOPING THE MEANS AND

METHODS TO EMPLOY DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES. CONTRACTOR IS SOLELY

RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES DURING CONSTRUCTION AND FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO VERIFY ALL CONTROLLING ELEVATIONS AND DIMENSIONS.

5. EX 8" SS VCP TO BE DEMOLISHED, FOR NEW 15" VCP ALIGNMENT.

6. VCP TO BE USED FOR OPEN CUT.

7. CITY TO CORE AND INSTALL BELLS AT EXISTING MANHOLES. CONTRACTOR SHALL COORDINATE WITH CITY AND WAIT 24-HOURS PRIOR TO CONNECTING TO BELL.

8. OPEN CUT TRENCHING SHALL BE PER CITY OF ROSEVILLE STD DTL SS-1.

9. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD DTL SS-4.

10. INSIDE DROP CONNECTIONS PER CITY OF ROSEVILLE STD DTL SS-12 LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED
SSMH CONSTRUCTION NOTES:

1. CONTRACTOR TO REMOVE AND REPLACE LIGHT POLE AS NEEDED.

2. CONTRACTOR TO REPLACE SIDEWALK, CURB AND GUTTER PER CITY OF ROSEVILLE STD DTL ST-17.

3. NEW SSMH PER CITY OF ROSEVILLE STD DTL SS-2 AND SS-3, UNLESS OTHERWISE SPECIFIED.

11. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND DISTRIBUTE DOOR HANGER NOTIFICATION PER SPECIFICATION 01 31 13 TO ALL AFFECTED

BUSINESSES AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

12. SEE DRAWING C-09 FOR HICKORY WORK ZONE PLAN.

CAP/ABANDON

EX OUTLET TO BE

CAPPED AND

ABANDONED SEE
DWG C-04 FOR LIMITS

FOR CONTINUATION
SEE DWG C-04 FOR
LIMITS

SEE SSMH

CONNECTION NOTES
3 SD-01

SS

W W W W W W W W W W W W W W W W W
W W W
W W W
W
W
W
W
W
W
W
W
W W W

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO E E

GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS

GAS GAS GAS GAS GAS GAS GAS GAS GAS

GAS GAS
GAS

GAS GAS
GAS
GAS
40+00 41+00 42+00 43+00
44+00 45+00 46+00 47+00 48+00 49+00
350 W DURANTA ST
012-093-018602 ATKINSON ST
012-046-007
600 ATKINSON ST
012-046-006
506 ATKINSON ST
012-046-005
504 ATKINSON ST
012-046-004
502 ATKINSON ST
012-046-003
1000 ELM ST
012-046-002
559 ATKINSON ST
012-131-030
555 ATKINSON ST
012-131-024
507 ATKINSON ST
012-131-041
503 ATKINSON ST
012-131-040
327 ELM ST
012-133-015
413 ATKINSON ST
012-133-016
322 FIG ST
012-133-011
316 FIG ST
012-133-010
333 ATKINSON ST
012-161-001
329 ATKINSON ST
012-161-015
325 ATKINSON ST
012-161-016
321 ATKINSON ST
012-161-017
319 ATKINSON ST
012-161-013
317 ATKINSON ST
012-161-012
1001 ELM ST
012-044-007
406 ATKINSON ST
012-044-008
404 ATKINSON ST
012-044-009
402 ATKINSON ST
012-044-010
400 ATKINSON ST
012-044-011
316 ATKINSON ST
012-044-012
314 ATKINSON ST
012-044-010
312 ATKINSON ST
012-044-011
310 ATKINSON ST
012-044-012
308 ATKINSON ST
012-044-013
306 ATKINSON ST
012-044-014
348 W DURANTA ST
353 W DURANTA ST
012-131-031
349 W DURANTA ST
012-131-002
338 ELM ST
012-131-017 321 ELM ST
012-133-002
314 FIG ST
012-133-009
313 FIG ST
012-161-032
SSMH C04-385
STA: 43+26.44
RIM: 161.86
SSMH C04-155
STA: 43+35.77
RIM: 161.78
SSMH C04-179
STA: 46+39.47
RIM: 158.12
SSMH C04-136
STA: 40+20.97
RIM: 159.57
MATCHLINE - 49+00
SEE DWG C-04
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50 48+00 48+50 49+00 14" HDPE S: -0.14% 14" HDPE S: -0.28%
MATCHLINE - 49+00
SEE DWG C-04
INV ELEV: 145.53
(EX)10" VCP S: -0.14%(EX)10" VCP S:-10%
(EX)10" VCP S: -0.28%
SSMH C04-385
STA: 43+26.44
14" INV IN: 146.86 (N)
14" INV OUT: 146.86 (E)
RIM: 161.86
SSMH C04-155
STA: 43+35.77
6" INV IN: 153.58 (E)
14" INV IN: 146.78 (W)
14" INV OUT: 146.78 (S)
RIM: 161.78
SSMH C04-179
STA: 46+39.47
14" INV IN: 146.37 (N)
14" INV OUT: 146.32 (S)
RIM: 158.12
STA: 44+49.2± - EXST 2" W
ELEV: 157.0±
STA: 45+11.8± - EXST 2" W
ELEV: 156.4±
STA: 45+65.9± - EXST 2" W
ELEV: 155.6±
STA: 46+19.5± - EXST 2" W
ELEV: 154.8±
STA: 46+77.6± - EXST 2" W
ELEV: 154.6±
STA: 47+26.4± - EXST 2" W
ELEV: 153.9±
STA: 47+82.6± - EXST 2" W
ELEV: 153.7±
STA: 48+37.1± - EXST 2" W
ELEV: 153.0±
STA: 48+87.1± - EXST 2" W
ELEV: 152.8±
STA: 46+83.8± - EXST GAS LAT
ELEV: 154.9±
STA: 47+51.4± - EXST GAS LAT
ELEV: 153.7±
STA: 47+75.9± - EXST GAS LAT
ELEV: 154.1±
STA: 48+28.8± - EXST GAS LAT
ELEV: 153.1±
STA: 48+75.7± - EXST GAS LAT
ELEV: 152.7±
EXST
STA: 47+99.4± - EXST ELECT
ELEV: 155.2±
SSMH C04-136
STA: 40+20.97
10" INV IN: 147.17 (N)
8" INV IN: 154.47 (E)
14" INV OUT: 147.17 (S)
RIM: 159.57
EXST
EXST
14" HDPE S: -0.10%
STA: 43+94.3± - EXST SS
STA: 44+16.8± - EXST 4" SS
STA: 41+88.5± - EXST 4" SS
STA: 42+48.2± - EXST 4" SS
STA: 47+16.6± - EXST 4" SS
STA: 47+31.2± - EXST 4" SS
STA: 47+93.9± - EXST 4'" SS
STA: 48+42.5± - EXST 4" SS
STA: 48+91.1± - EXST 4" SS
STA: 41+73.8± - EXST 4" SS
STA: 41+19.2± - EXST 4" SS
STA: 43+47.7± - EXST 6" W
ELEV: 158.1±
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-03.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-03.DWG 10:58:114/22/24
C-03

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

ATKINSON ST

PLAN AND PROFILE
40+00 TO 49+00
23-056
10 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FIG ST

ATKINSON ST
ELM ST
ELM ST
EG

W DURANTA ST
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM
CONSTRUCTION RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. VCP TO BE USED FOR OPEN CUT.

7. CITY TO CORE AND INSTALL BELLS AT EXISTING
MANHOLES. CONTRACTOR SHALL COORDINATE WITH CITY
AND WAIT 24-HOURS PRIOR TO CONNECTING TO BELL.

8. OPEN CUT TRENCHING SHALL BE PER CITY OF ROSEVILLE
STD DTL SS-1.

9. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

10.CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

11. SEE DRAWING C-10 FOR ATKINSON WORK ZONE PLAN.

PIPE BURSTING
SEE NOTE 5

PIPE BURSTING
SEE NOTE 5

MANDATORY

OPEN CUT
SEE NOTE 6
AND 8
1 SD-01
1 SD-01
SEE NOTE 7
1 SD-01
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON

SSSS
SS
W
W

W W W W
W
W

W W W W W W W W W W W W W

W W W W W
W
W
SDSD

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO

GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS

GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
49+00 50+00 51+00 52+00
53+00
53+50

HICKORY ST

ATKINSON ST

HICKORY ST
321 ATKINSON ST
012-161-017
319 ATKINSON ST
012-161-013
317 ATKINSON ST
012-161-012
315 ATKINSON ST
012-161-011
313 ATKINSON ST
012-161-010
309 ATKINSON ST
012-161-009
307 ATKINSON ST
012-161-021
305 ATKINSON ST
012-161-020
310 ATKINSON ST
012-044-012
308 ATKINSON ST
012-044-013
306 ATKINSON ST
012-044-014
304 ATKINSON ST
012-044-015
302 ATKINSON ST
012-044-016
300 ATKINSON ST
012-044-017
1000 HICKORY ST
012-064-018
1002 HICKORY ST
012-064-019
1003 HICKORY ST
012-065-002
214 ATKINSON ST
012-065-003
318 ATKINSON ST
012-165-001
310 HICKORY ST
012-065-012
1002 CIRCUIT DR
012-065-011
936 CIRCUIT DR
012-061-007
102 ATKINSON ST
012-010-049
215 ATKINSON ST
012-165-009
211 ATKINSON ST
012-165-008
207 ATKINSON ST
012-165-007
203 ATKINSON ST
012-165-010
1006 CIRCUIT DR
012-065-003
1010 CIRCUIT DR
012-065-004
1014 CIRCUIT DR
012-065-005
303 IVY ST
012-065-006
932 CIRCUIT DR
012-061-006
930 CIRCUIT DR
012-061-005
SSMH C04-025
STA: 49+14.12
RIM: 156.14
SSMH C04-203
STA: 52+54.27
RIM: 154.37
SSMH C04-204
RIM: 153.34
SSMH-02(NEW)
STA: 53+45.68
RIM: 153.67
SSMH C04-217
RIM: 155.20
SSMH C04-217A
RIM: 155.07
MATCHLINE - 49+00
SEE DWG C-03
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 14" HDPE S: -0.15%
MATCHLINE - 49+00
SEE DWG C-03
INV ELEV: 145.53
(EX)10" VCP S: -0.15%
SSMH C04-203
STA: 52+54.18
14" INV IN: 144.97 (N)
10" INV OUT: 144.92 (E)
15" INV OUT: 144.87 (W)
RIM: 154.37
STA: 49+30.9± - EXST W
ELEV: 152.8±
STA: 50+32.6± - EXST GAS
ELEV: 152.3±
STA: 50+39.3± - EXST W
ELEV: 152.4±
STA: 51+05.8± - EXST GAS
ELEV: 151.7±
STA: 51+12.2± - EXST W
ELEV: 151.8±
STA: 52+36.3± - EXST W
ELEV: 148.8±
SSMH C04-025
STA: 49+14.12
14" INV IN: 145.54 (N)
14" INV OUT: 145.49 (S)
RIM: 156.14

EXST TO BE CAPPED
STA: 49+40.6± - EXST 4" SS
STA: 49+89.3± - EXST 4" SS
STA: 50+44.7± - EXST 4" SS
STA: 51+01.3± - EXST 4" SS
STA: 51+47.5± - EXST 4" SS
SSMH-02 (NEW)
STA: 53+45.68
SS LAT INV IN: 144.79 (N)
RIM: 153.67
EXST TO BE CAPPED10" INV IN: 144.79 (W)
10" INV OUT: 144.79 (E)
STA: 53+19.8± - EXST W
ELEV: 150.6±
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-04.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-04.DWG 11:01:504/22/24
C-04

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

ATKINSON ST

PLAN AND PROFILE
49+00 TO 53+50
23-056
11 PLAN
1"=40'

PROFILE
1"=40' HORIZ
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
EG
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. VCP TO BE USED FOR OPEN CUT.

7. OPEN CUT TRENCHING SHALL BE PER CITY OF ROSEVILLE
STD DTL SS-1.

8. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

9. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

10.SEE DRAWING C-10 FOR ATKINSON WORK ZONE PLAN.

PIPE BURSTING
SEE NOTE 5
SEE DWG C-02 FOR

HICKORY ST

IMPROVEMENTS
EXISTING 10" SEWER MAIN TO

BE CAPPED AND ABANDONEDSEE SSMH CONSTRUCTION NOTES
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON
SSMH CONSTRUCTION NOTES:

1. CONTRACTOR TO INSTALL NEW MANHOLE PRIOR TO
ABANDONMENT OF 10" SS.

2. NEW SSMH PER CITY OF ROSEVILLE STD DTL SS-2 AND
SS-3, UNLESS OTHERWISE SPECIFIED.
1 SD-01
4 SD-01

SS
SS
SS
SS
SS
SS
W

W W W W W W W W W W W W W W W
W
WWW
W

W W W W W W W W W W
XO
XO

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO XO
XO
XOXO
XOXO

XOXOXOXOXOXOXOXOXO
XO
XO
XO
XO
XO

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO
XO

EEEEEEEEEEEEEEEEEEE
GAS
GAS
GAS
GAS
SS
W
W
W
W
W
170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00
100 ATKINSON ST
012-010-050
103 ATKINSON ST
012-181-010
1400 CHURCH ST
012-181-009
1401 CHURCH ST
473-060-00298 ATKINSON ST
473-050-002
1342 CHURCH ST
012-183-018
1316 CHURCH ST
012-183-017
1314 CHURCH ST
012-183-016
1312 CHURCH ST
012-183-015
1310 CHURCH ST
012-183-014
1308 CHURCH ST
012-183-013
1306 CHURCH ST
012-183-012
1302 CHURCH ST
012-183-011 109 IVY ST
012-183-010
113 IVY ST
012-183-009
100 IVY ST012-184-057
000 CHURCH ST
473-060-001
105 ATKINSON ST
012-181-011
109 ATKINSON ST
012-181-012

CIRCUIT DR
012-181-008
104 IVY ST012-184-056
108 IVY ST012-184-055
112 IVY ST012-184-054
012-184-053
SSMH B04-006
STA: 171+74.41
RIM: 157.68
SSMH B04-007
STA: 173+29.96
RIM: 160.38
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
170+00 170+50 171+00 171+50 172+00 172+50 173+00 173+50 174+00 174+50 175+00 175+50 176+00 176+50 177+00 177+50 178+00 178+50 179+00 MATCHLINE - 179+00
SEE DWG C-06
INV ELEV: 143.97
(EX)12" VCP (EX)12" VCP S: -0.35%
(EX)12" VCP S: -0.15%
18" HDPE S: -0.35%
18" HDPE S: -0.15%
SSMH B04-006
STA: 171+74.41
10" INV IN: 143.13 (N)
18" INV IN: 142.38 (E)
12" INV OUT: 142.43 (W)
12" INV OUT: 143.53 (SW)
RIM: 157.68
SSMH B04-007
STA: 173+29.96
18" INV IN: 143.13 (E)
4" INV IN: 155.28 (NE)
18" INV OUT: 142.93 (W)
RIM: 160.38
EXST
EXST
EXST
EXST
STA: 172+26.8± - EXST GAS
ELEV: 155.3±
STA: 173+41.7± - EXST W
ELEV: 156.1±
STA: 173+97.7± - EXST W
ELEV: 157.5±
STA: 177+11.9± - EXST SS
STA: 177+97.5± - EXST 4" SS
STA: 174+03.0± - EXST 4" SS
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-05.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-05.DWG 11:03:224/22/24
C-05

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST

PLAN AND PROFILE
170+00 TO 179+00
23-056
12 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT
MATCHLINE - 179+00
SEE DWG C-06
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

CIRCUIT DR

ATKINSON ST

CHURCH ST
IVY ST

VINEYARD RD
EG
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 12" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

8. CONTRACTOR TO HAVE A-FRAME SIGNS WITH
NOTIFICATION OF WORK SET UP 72-HOURS IN ADVANCE.

9. SEE DRAWING C-11 FOR CHURCH ST WORK ZONE PLAN.

PIPE BURSTING
SEE NOTE 5
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON

CAUTION

OVERHEAD

POWER LINE

CAUTION

OVERHEAD

POWER LINE

CAUTION

OVERHEAD

POWER LINE
1 SD-01

SS
SS
SS
SS
SS
SS SS
W
WW
WW
WWW
W

W W W W W W
W
W
W

W W W W W W W W W W W W
W
W
W

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO E
E
E
E
W
W W W
SSMH B04-008
STA: 179+42.18
RIM: 151.42 SSMH B04-302
STA: 180+00.68
RIM: 151.83
SSMH B04-301
STA: 181+49.55
RIM: 153.31
SSMH C04-233
STA: 183+11.67
RIM: 154.40
SSMH C04-229
STA: 186+21.83
RIM: 155.36
178+00
179+00
180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 1306 CHURCH ST012-183-012
1302 CHURCH ST012-183-011
109 IVY ST
012-183-010
113 IVY ST
012-183-009
012-184-058
100 IVY ST
012-184-057
012-184-059
101 HICKORY ST
012-184-010
1122 CHURCH ST012-185-013 1118 CHURCH ST012-185-012 1114 CHURCH ST012-185-011 1110 CHURCH ST012-185-024 1106 CHURCH ST012-185-025 1020 CHURCH ST012-171-014 1012 CHURCH ST012-171-013 1008 CHURCH ST012-171-029 1004 CHURCH ST012-171-030 013-250-016 013-250-016
104 IVY ST
012-184-056
108 IVY ST
012-184-055
112 IVY ST
012-184-054
116 IVY ST
012-184-053
120 IVY ST
012-184-052
105 HICKORY ST
012-184-011
109 HICKORY ST
012-184-012
113 HICKORY ST
012-184-013
117 HICKORY ST
012-184-014
121 HICKORY ST
012-184-015
MATCHLINE - 179+00SEE DWG C-05
MATCHLINE - 188+00
SEE DWG C-07
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
179+00 179+50 180+00 180+50 181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50 187+00 187+50 188+00 18" HDPE
S: -0.15%
SSMH B04-008
STA: 179+42.18
18" INV IN: 144.12 (NE)
8" INV IN: 146.67 (SE)
18" INV OUT: 144.07 (W)
RIM: 151.42
18" HDPE S: -0.45%
SSMH B04-302
STA: 180+00.68
18" INV IN: 144.38 (NE)
6" INV IN: 145.43 (NW)
18" INV OUT: 144.38 (SW)
RIM: 151.83
18" HDPE S: -0.29%
SSMH B04-301
STA: 181+49.55
18" INV IN: 144.81 (NE)
6" INV IN: 145.31 (NW)
18" INV OUT: 144.81 (SW)
RIM: 153.31
18" HDPE S: -0.21%
SSMH C04-233
STA: 183+11.67
18" INV IN: 145.15 (NE)
8" INV IN: 145.75 (NW)
18" INV OUT: 145.15 (SW)
RIM: 154.40
18" HDPE S: -0.25%
SSMH C04-229
STA: 186+21.83
18" INV IN: 145.91 (NE)
6" INV IN: 146.21 (NW)
18" INV OUT: 145.91 (SW)
RIM: 155.36
18" HDPE S: -0.22%
MATCHLINE - 179+00
SEE DWG C-05
CL ELEV: 143.97
MATCHLINE - 188+00
SEE DWG C-07
CL ELEV: 146.30
(EX)12" VCP
S: -0.15%
(EX)12" VCP
S: -0.45%
STA: 179+59.3± - EXST 12" W
ELEV: 147.0±
STA: 180+53.7± - EXST W
ELEV: 148.9±
STA: 181+53.4± - EXST W
ELEV: 149.5±
STA: 183+23.0± - EXST W
ELEV: 150.9±
EXST
EXST
EXST
EXST
EXST
STA: 180+57.7± - EXST SS
STA: 180+62.7± - EXST SS
STA: 180+85.5± - EXST SS
STA: 181+12.7± - EXST SS
STA: 181+33.2± - EXST SS
STA: 181+37.7± - EXST SS
STA: 181+63.7± - EXST SS
STA: 181+87.9± - EXST SS
STA: 182+12.8± - EXST SS
STA: 182+35.3± - EXST SS
STA: 182+62.1± - EXST SS
STA: 183+71.9± - EXST SS
STA: 183+88.9± - EXST SS
STA: 184+01.0± - EXST SS
STA: 184+22.8± - EXST SS
STA: 184+48.0± - EXST SS
STA: 184+68.0± - EXST 4" SS
STA: 184+69.6± - EXST SS
STA: 184+97.0± - EXST SS
STA: 185+18.9± - EXST SS
STA: 185+56.9± - EXST SS
STA: 185+67.0± - EXST SS
STA: 186+32.2± - EXST SS
STA: 186+80.2± - EXST SS
STA: 186+91.3± - EXST SS
STA: 186+95.9± - EXST 4" SS
STA: 187+04.8± - EXST SS
STA: 187+32.0± - EXST SS
STA: 187+54.8± - EXST SS
STA: 187+79.7± - EXST SS
(EX)12" VCP S: -0.22%
(EX)12" VCP S: -0.25%
(EX)12" VCP S: -0.29% (EX)12" VCP S: -0.21%
STA: 182+86.8± - EXST E
ELEV: 150.6±
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-06.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-06.DWG 11:04:494/22/24
C-06

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST

PLAN AND PROFILE
179+00 TO 188+00
23-056
13 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

PICKWICK ALY

CHURCH ST
IVY ST

HICKORY ST

GRAPE ST
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 12" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

8. SEE DRAWING C-11 FOR CHURCH ST WORK ZONE PLAN.

PIPE BURSTING
SEE NOTE 5
EG
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON
1 SD-01

188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 SSMH C04-220
STA: 192+39.56
RIM: 156.96
SSMH C04-197
STA: 195+47.23
RIM: 156.76
1008 CHURCH ST012-171-029 1004 CHURCH ST012-171-030 012-171-031 916 CHURCH ST012-172-012 908 CHURCH ST012-172-032 900 CHURCH ST012-172-009 100 ELM ST012-173-006
108 ELM ST012-173-007
812 CHURCH ST012-173-005 808 CHURCH ST012-173-008 804 CHURCH ST012-173-009 800 CHURCH ST012-173-003 720 CHURCH ST012-143-012 712 CHURCH ST012-143-011 704 CHURCH ST012-143-010 013-250-016
013-250-016
SS
SS
SS
SS

W W W W W W W W W W W W W W W W

W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO W
SSMH C04-224
STA: 189+31.24
RIM: 156.33
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
188+00 188+50 189+00 189+50 190+00 190+50 191+00 191+50 192+00 192+50 193+00 193+50 194+00 194+50 195+00 195+50 196+00 196+50 197+00 18" HDPE S: -0.22%
SSMH C04-224
STA: 189+31.24
18" INV IN: 146.58 (NE)
6" INV IN: 151.98 (NW)
18" INV OUT: 146.58 (SW)
RIM: 156.33
18" HDPE S: -0.24%
SSMH C04-220
STA: 192+39.56
18" INV IN: 147.37 (NE)
6" INV IN: 148.95 (NW)
18" INV OUT: 147.32 (SW)
RIM: 156.96
18" HDPE S: -0.26%
SSMH C04-197
STA: 195+47.23
14" INV IN: 148.36 (NE)
10" INV IN: 148.36 (NW)
18" INV OUT: 148.16 (SW)
RIM: 156.76
14" HDPE S: -0.09%
MATCHLINE - 197+00
SEE DWG C-08
INV ELEV: 148.50
MATCHLINE - 188+00
SEE DWG C-06
CL ELEV: 146.30
EXST
EXST
EXST
STA: 188+31.7± - EXST SS
STA: 188+56.3± - EXST SS
STA: 188+78.8± - EXST SS
STA: 189+42.1± - EXST SS
STA: 189+92.0± - EXST SS
STA: 190+16.7± - EXST SS
STA: 190+42.1± - EXST SS
STA: 190+69.2± - EXST 6" SS
STA: 190+73.7± - EXST SS
STA: 190+89.7± - EXST SS
STA: 191+19.8± - EXST SS
STA: 191+42.1± - EXST SS
STA: 191+67.2± - EXST SS
STA: 191+89.8± - EXST SS
STA: 192+47.7± - EXST SS
STA: 192+96.9± - EXST SS
STA: 193+14.8± - EXST 4" SS
STA: 193+24.2± - EXST SS
STA: 193+52.4± - EXST SS
STA: 193+77.5± - EXST SS
STA: 194+07.2± - EXST SS
STA: 194+10.0± - EXST SS
STA: 194+27.9± - EXST SS
STA: 194+50.2± - EXST SS
STA: 194+75.3± - EXST SS
STA: 195+00.8± - EXST SS
STA: 195+19.9± - EXST SS
STA: 195+75.3± - EXST SS
STA: 196+09.8± - EXST SS
STA: 196+56.9± - EXST 4" SS
STA: 196+61.5± - EXST SS
STA: 196+63.5± - EXST SS
STA: 196+70.7± - EXST SS
STA: 196+90.1± - EXST SS
STA: 188+06.7± - EXST SS
(EX)10" VCP S: -0.09%
(EX)12" VCP S: -0.24% (EX)12" VCP S: -0.26%
(EX)12" VCP S: -0.22%
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-07.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-07.DWG 11:05:334/22/24
C-07

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST

PLAN AND PROFILE
188+00 TO 197+00
23-056
14 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

DURANTA ST

CHURCH ST
FIG ST
ELM ST
MATCHLINE - 188+00
SEE DWG C-06
MATCHLINE - 197+00
SEE DWG C-08

UPRR ENTRANCE
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 12" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

7. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

8. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

9. SEE DRAWING C-12 FOR CHURCH ST WORK ZONE PLAN

PIPE BURSTING
SEE NOTE 5

PIPE BURSTING
SEE NOTE 6
EG
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON
1 SD-01
1 SD-01

SS
SS
SS
SS

W W W W W W W W W
W
W
W
W
W
W

W W W W W W W
W
W
W
W
W
W
W

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO

XOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXOXO

XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
XO
W
197+00 198+00 199+00 200+00 201+00 202+00
SSMH C04-189
STA: 198+66.60
RIM: 157.45
SSMH C04-183
STA: 201+69.14
RIM: 158.17
712 CHURCH ST012-143-011 704 CHURCH ST012-143-010 616 CHURCH ST012-144-013 608 CHURCH ST012-144-012 604 CHURCH ST012-144-011 CHURCH ST012-144-010 512 CHURCH ST012-151-009 510 CHURCH ST012-151-008 506 CHURCH ST012-151-007
504 CHURCH ST012-151-006
CHURCH ST012-151-005
013-250-016
405 CHURCH ST
012-152-011
102 ASH ST
012-152-012
108 ASH ST
012-152-013
112 ASH ST
012-152-014
116 ASH ST
012-152-015
118 ASH ST
012-152-016
125
130
135
140
145
150
155
160
165
170
125
130
135
140
145
150
155
160
165
170
197+00 197+50 198+00 198+50 199+00 199+50 200+00 200+50 201+00 201+50 202+00 202+50 14" HDPE S: -0.09%
SSMH C04-189
STA: 198+66.60
14" INV IN: 148.80 (NE)
6" INV IN: 149.60 (NW)
14" INV OUT: 148.65 (SW)
RIM: 157.45
14" HDPE S: -0.24%
SSMH C04-183
STA: 201+69.14
10" INV IN: 149.52 (NE)
6" INV IN: 153.77 (NW)
14" INV OUT: 149.52 (SW)
RIM: 158.17
10" HDPE S: -0.26%
MATCHLINE - 197+00
SEE DWG C-07
CL ELEV: 148.50
EXST
EXST
EXST
STA: 197+16.8± - EXST SS
STA: 197+36.7± - EXST SS
STA: 197+41.2± - EXST SS
STA: 197+67.2± - EXST SS
STA: 197+71.2± - EXST SS
STA: 197+88.1± - EXST SS
STA: 198+17.7± - EXST SS
STA: 198+72.7± - EXST SS
STA: 199+19.7± - EXST SS
STA: 199+34.4± - EXST SS
STA: 199+69.0± - EXST SS
STA: 199+91.1± - EXST SS
STA: 200+23.2± - EXST SS
STA: 200+29.7± - EXST 4" SS
STA: 200+45.3± - EXST SS
STA: 200+50.4± - EXST SS
STA: 200+75.3± - EXST SS
STA: 200+88.7± - EXST SS
STA: 200+97.3± - EXST SS
STA: 201+19.4± - EXST SS
(EX)10" VCP S: -0.09%
(EX)10" VCP S: -0.24%
40 8040
SCALE 1"=40'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 23056D-C-08.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-08.DWG 11:06:144/22/24
C-08

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST

PLAN AND PROFILE
197+00 TO 202+50
23-056
15 PLAN
1"=40'

PROFILE
1"=40' HORIZ
1"=5' VERT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
ASH ST

CHURCH ST

CEDAR ST

BIRCH ST
MATCHLINE - 197+00
SEE DWG C-07
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM
CONSTRUCTION RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. LATERAL REINSTATEMENT PER CITY OF ROSEVILLE STD
DTL SS-4.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

8. SEE DRAWING C-12 FOR CHURCH ST WORK ZONE PLAN.

PIPE BURSTING
SEE NOTE 5
EG

CONTRACTOR TO REPLACE
(EX) PAVED CROSSWALK

IN-KIND AS NEEDED
LEGEND

ACTIVE REINSTATE

CAPPED/ABANDONED

BLOCKED

CAP/ABANDON
SSMH C04-168
RIM: 158.40
1 SD-01

BRENTWOOD RDAMBERWOOD RD
X X X
X
10+00 11+00 12+00 13+00 14+00 15+00

PORTER DR HICKORY ST
MATCHLINE - 15+50

SEE BELOW LEFT

ATKINSON ST

BROOKWOOD RD
X

X X X X
XXX
X
X X X
16+00 17+00 18+00 19+00
20+00

HICKORY ST
MATCHLINE - 15+50

SEE ABOVE RIGHT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
20 4020
SCALE 1"=20'
0 FEET
HORIZ
NORTH
FILENAME: 23056D-C-09.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-09.DWG 11:16:394/22/24
C-09

CIVIL A CORREA
B. DALEY

K ALACON

K ALACON

HICKORY ST

WORK ZONE
23-056
16 HICKORY ST WORK ZONE PLAN
1"=20'
LEGEND

WORK ZONE
STAGING AREA NOTES:

1. PLACE BRIGHTLY COLORED ESA FENCING

ALONG THE BOUNDARY AREA OF WHAT IS

UNSUITABLE FOR CONSTRUCTION/LAYDOWN
AREA.

2. ADDITIONAL LAYDOWN AREA IS AVAILABLE AT
1800 BOOTH ROAD. CONTRACTOR TO
COORDINATE WITH CITY OF ROSEVILLE.

HICKORY ST WORK ZONE NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 1090 LF

4. APPROX. WORK AREA: 26700 SF

5. ANTICIPATED DURATION: 20-30 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

OPEN CUT TRENCHING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP
NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

HICKORY ST WORK ZONE PLAN
1"=20'

40+00 41+00 42+00 43+00
44+00 45+00 46+00 47+00 48+00
MATCHLINE - 48+00

SEE BELOW LEFT
46+00 47+00 48+00 49+00 50+00 51+00 52+00
53+00
53+50
MATCHLINE - 48+00

SEE ABOVE RIGHT
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 23056D-C-10.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-10.DWG 11:18:304/22/24
C-10

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

ATKINSON ST
WORK ZONE 1 AND 2
23-056
17 ATKINSON ST WORK ZONE 1 PLAN
1"=40'
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

ATKINSON ST
ELM ST
ELM ST

W DURANTA ST
STAGING AREA NOTES:

1. PLACE BRIGHTLY COLORED ESA FENCING

ALONG THE BOUNDARY AREA OF WHAT IS

UNSUITABLE FOR CONSTRUCTION/LAYDOWN
AREA.

2. ADDITIONAL LAYDOWN AREA IS AVAILABLE AT
1800 BOOTH ROAD. CONTRACTOR TO
COORDINATE WITH CITY OF ROSEVILLE.

ATKINSON ST WORK ZONE 1 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 1420 LF

4. APPROX. WORK AREA: 13010 SF

5. ANTICIPATED DURATION: 30-35 DAYS PLUS
SURFACE RESTORATION.

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP
NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

ATKINSON ST
FIG ST

HICKORY ST

HICKORY ST
FIG ST
ATKINSON ST WORK ZONE 2 PLAN
1"=40'
LEGEND

WORK ZONE
ATKINSON ST WORK ZONE 2 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 1160 LF

4. APPROX. WORK AREA: 11430 SF

5. ANTICIPATED DURATION: 30-35 DAYS PLUS
SURFACE RESTORATION.

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP

170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00
100 ATKINSON ST
012-010-050
103 ATKINSON ST
012-181-010
1400 CHURCH ST
012-181-009
1401 CHURCH ST
473-060-00298 ATKINSON ST
473-050-002
1342 CHURCH ST
012-183-018
1316 CHURCH ST
012-183-017
1314 CHURCH ST
012-183-016
1312 CHURCH ST
012-183-015
1310 CHURCH ST
012-183-014
1308 CHURCH ST
012-183-013
1306 CHURCH ST
012-183-012
1302 CHURCH ST
012-183-011 109 IVY ST
012-183-010
113 IVY ST
012-183-009
012-184-058
100 IVY ST012-184-057
000 CHURCH ST
473-060-001
105 ATKINSON ST
012-181-011
109 ATKINSON ST
012-181-012

CIRCUIT DR
012-181-008
104 IVY ST012-184-056
108 IVY ST012-184-055
112 IVY ST012-184-054
116 IVY ST012-184-053
120 IVY ST012-184-052
124 IVY ST012-184-051
MATCHLINE - 179+42.46

SEE BELOW LEFT
180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 109 IVY ST
012-183-010
113 IVY ST
012-183-009
012-184-058
100 IVY ST
012-184-057
012-184-059
101 HICKORY ST
012-184-010
1122 CHURCH ST012-185-013 1118 CHURCH ST012-185-012 1114 CHURCH ST012-185-011 1110 CHURCH ST012-185-024 1106 CHURCH ST012-185-025 1020 CHURCH ST012-171-014 1012 CHURCH ST012-171-013 013-250-016 013-250-016
104 IVY ST
012-184-056
108 IVY ST
012-184-055
112 IVY ST
012-184-054
116 IVY ST
012-184-053
120 IVY ST
012-184-052
105 HICKORY ST
012-184-011
109 HICKORY ST
012-184-012
113 HICKORY ST
012-184-013
117 HICKORY ST
012-184-014
121 HICKORY ST
012-184-015
MATCHLINE - 179+42.46SEE ABOVE RIGHT
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 23056D-C-11.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-11.DWG 11:19:174/22/24
C-11

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST
WORK ZONE 1 AND 2
23-056
18 CHURCH ST WORK ZONE 1 PLAN
1"=50'
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
STAGING AREA NOTES:

1. PLACE BRIGHTLY COLORED ESA FENCING

ALONG THE BOUNDARY AREA OF WHAT IS

UNSUITABLE FOR CONSTRUCTION/LAYDOWN
AREA.

2. ADDITIONAL LAYDOWN AREA IS AVAILABLE AT
1800 BOOTH ROAD. CONTRACTOR TO
COORDINATE WITH CITY OF ROSEVILLE.

CHURCH ST WORK ZONE 1 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 770 LF

4. APPROX. WORK AREA: 30980 SF

5. ANTICIPATED DURATION: 15-20 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP
NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

CHURCH ST WORK ZONE 2 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 690 LF

4. APPROX. WORK AREA: 16600 SF

5. ANTICIPATED DURATION: 15-20 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURE AND DETOUR

8. FLOW CONTROL: BYPASS PUMP
NORTH
CHURCH ST WORK ZONE 2 PLAN
1"=40'

CIRCUIT DR

CHURCH ST

ATKINSON ST

VINEYARD RD

ATKINSON ST
IVY ST
IVY ST

PICKWICK ALY

HICKORY ST

GRAPE ST

CHURCH ST
50 10050
SCALE 1"=50'
0 FEET
HORIZ
LEGEND

WORK ZONE
186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 1106 CHURCH ST012-185-025 1020 CHURCH ST012-171-014 1012 CHURCH ST012-171-013 1008 CHURCH ST012-171-029 1004 CHURCH ST012-171-030 012-171-031 916 CHURCH ST012-172-012 908 CHURCH ST012-172-032 900 CHURCH ST012-172-009 100 ELM ST012-173-006
108 ELM ST012-173-007
012-173-005
013-250-016
013-250-016
192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 900 CHURCH ST012-172-009
100 ELM ST012-173-006
108 ELM ST012-173-007
812 CHURCH ST012-173-005 808 CHURCH ST012-173-008 804 CHURCH ST012-173-009 800 CHURCH ST012-173-003 720 CHURCH ST012-143-012 712 CHURCH ST012-143-011 704 CHURCH ST012-143-010 616 CHURCH ST012-144-013 013-250-016
195+00 196+00 197+00 198+00 199+00 200+00 201+00 202+00 804 CHURCH ST012-173-009 800 CHURCH ST012-173-003 720 CHURCH ST012-143-012 712 CHURCH ST012-143-011 704 CHURCH ST012-143-010 616 CHURCH ST012-144-013 608 CHURCH ST012-144-012 604 CHURCH ST012-144-011 CHURCH ST012-144-010 013-250-016 013-250-016
40 8040
SCALE 1"=40'
0 FEET
HORIZ
FILENAME: 23056D-C-12.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-12.DWG 11:20:104/22/24
C-12

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CHURCH ST
WORK ZONE 3, 4 AND 5
23-056
19 CHURCH ST WORK ZONE 3 PLAN
1"=40'
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A STAGING AREA NOTES:

1. PLACE BRIGHTLY COLORED ESA FENCING

ALONG THE BOUNDARY AREA OF WHAT IS

UNSUITABLE FOR CONSTRUCTION/LAYDOWN
AREA.

2. ADDITIONAL LAYDOWN AREA IS AVAILABLE AT
1800 BOOTH ROAD. CONTRACTOR TO
COORDINATE WITH CITY OF ROSEVILLE.

CHURCH ST WORK ZONE 3 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 620 LF

4. APPROX. WORK AREA: 12610 SF

5. ANTICIPATED DURATION: 30-40 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP
NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

NORTH
CHURCH ST WORK ZONE 4 PLAN
1"=40'
CHURCH ST WORK ZONE 5 PLAN
1"=40'
CHURCH ST WORK ZONE 4 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 630 LF

4. APPROX. WORK AREA: 13790 SF

5. ANTICIPATED DURATION: 30-40 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP
CHURCH ST WORK ZONE 5 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 305 LF

4. APPROX. WORK AREA: 13790 SF

5. ANTICIPATED DURATION: 30-40 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS

8. FLOW CONTROL: BYPASS PUMP

GRAPE ST

CHURCH ST
FIG ST
ELM ST
ELM ST

DURANTA ST

CEDAR ST

DURANTA ST

CEDAR ST

BIRCH ST

CHURCH ST

CHURCH ST
LEGEND

WORK ZONE
NO. DATE REVISION BY APVD

CITY OF ROSEVILLE

SCHEDULE B - SIERRA COLLEGE BLVD
CHURCH STREET AND PUMP STATION 26 COLLECTION SYSTEM IMPROVEMENTS PROJECT A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FILENAME: 23056D-C-13.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-C-13.DWG 11:21:194/22/24
C-13

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SCHEDULE B - SIERRA COLLEGE BLVD
23-056
20 1+00
2+00
3+00
3+29
CP
9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+0034+15 20 4020
SCALE 1"=20'
0 FEET
50 10050
SCALE 1"=50'
0 FEET
NORTH
FILENAME: 2060D-C-14.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-14.DWG 11:22:414/22/24
C-14

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PROJECT OVERVIEW AND KEY MAP
23-056
21 NORTH

PUMP STATION KEY MAP
1"=20'

SANITARY SEWER KEY MAP
1"=50'

SIERRA COLLEGE BLVD

SIERRA COLLEGE BLVD

EAST ROSEVILLE PARKWAY

SIERRA COLLEGE BLVD

SIERRA COLLEGE BLVD SIERRA COLLEGE BLVD

EUREKA RD

BASIS OF BEARINGS

THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, ZONE 2, GRID NORTH AND WAS

ESTABLISHED FROM GPS OBSERVATIONS FROM THE
CALIFORNIA NETWORK OF MONUMENTS.

BENCHMARK
CITY OF ROSEVILLE BENCHMARK NO. 38. A 3/4" BRASS
DISC STAMPED 2018 PLS 8728, IN TOP OF CURB AT DRAIN

INLET AT NORTHEAST CORNER OF SIERRA COLLEGE
BOULEVARD AND EAST ROSEVILLE PARKWAY.

ELEVATION: 243.62' DATUM: NAVD88

BENCHMARK
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
PUMP STATION NO. 26 IMPROVEMENTS

ARE NOT PAR OF THIS CONTRACT

CP
3+29
1+00
2+00
3+00
(EX) MH NO 1
STA: 2+92.59
RIM: 204.54
(EX) WET WELL
STA: 3+28.57
RIM: 203.71±

WEIR MH
STA: 1+20.88
RIM: 205.56
SEE DWG C-10 FOR DETAILS
(EX) MH NO 2
STA: 1+00.00
RIM: 205.72
(205)
(203)
(204)
(EX) MH NO 1
STA: 2+92.59
RIM: 204.54
(EX) WET WELL
STA: 3+28.57
RIM: 203.71±EG
180
185
190
195
200
205
210
215
220
180
185
190
195
200
205
210
215
220
1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25

WEIR MH
STA: 1+20.88
RIM: 205.56
12" INV IN: 194.01 (S)
12" INV OUT: 193.68 (N)
12" PVC PIPE S: -0.72%
12" PVC PIPE S: -0.52%
(EX) PG&E POLE

APPROXIMATE

LOCATION OF
(EX) 2" W

APPROXIMATE

LOCATION OF (EX)
8" SSFM

PG&E TO HOLD

DURING BURSTING
(EX) 10" PVC PIPE S:-0.72%
(EX) 10" PVC PIPE S: 0.71%
(EX) MH NO 2
STA: 1+00.00
RIM: 205.72
12" INV IN: 192.79
12" INV IN: 192.59
12" INV OUT: 194.16 (N)
SEE NOTE 7
12" INV OUT: 192.79

20.88'
171.71'
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 2060D-C-15.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-15.DWG 11:23:544/22/24
C-15

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
0+50 TO 3+30±
23-056
22 SIERRA COLLEGE BLVD
PLAN
1"=20'

PROFILE
1"=20' HORIZ
1"=5' VERT
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS DIP TO BE REPLACED VIA PIPE BURSTING.

6. VCP TO BE USED FOR OPEN CUT. WHERE OPTIONAL OPEN

CUT AREAS ARE COMBINED WITH MANDATORY OPEN CUT

AREAS BETWEEN MANHOLES, THE PIPE MATERIAL SHALL

BE A SIMILAR MATERIAL ALONG THAT ENTIRE SEGMENT,
MANHOLE TO MANHOLE. IF TRENCHLESS IS UTILIZED

THROUGH THE OPTIONAL AREAS, THEN HDPE SHALL BE
USED IN MANDATORY OPEN CUT AREA. IF OPEN CUT IS

UTILIZED THROUGH OPTIONAL AREAS, THEN VCP SHALL
BE USED IN THE MANDATORY OPEN CUT AREA.

7. CITY TO CORE AND INSTALL BELLS AT EXISTING
MANHOLES. CONTRACTOR SHALL COORDINATE WITH CITY
AND WAIT 24-HOURS PRIOR TO CONNECTING TO BELL.

8. OPEN CUT TRENCHING SHALL BE PER CITY OF ROSEVILLE
STD DTL SS-1.

9. SEE WORK ZONE PLAN DRAWING C-22 FOR ALLOWABLE

WORK AREAS FOR PIPE BURSTING AND OPEN CUT
TRENCHING.

10.CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
KEY NOTES:
(NOT ALL NOTES ARE REFERENCED ON EACH DRAWING)

CONTRACTOR TO POTHOLE AND LOCATE SAN JUAN
WATER DISTRICT PIPE(S).1
(EX) PG&E POLE

5.5'

MANDATORY

OPEN CUT
SEE NOTE 6
AND 8

SEE WEIR MANHOLE
DETAIL ON DWG SD-02

CONNECT TO CITY

INSTALLED BELL
(SEE NOTE 7)
PUMPS STATION NO. 26 IMPROVEMENTS

ARE NOT PART OF THIS CONTRACT
1 REPLACE DRIVEWAY IN-KIND

PER CITY OF ROSEVILLE
STD DTL ST-21

REPLACE SIDEWALK IN-KIND
(AS NEEDED) PER CITY OF
ROSEVILLE STD DTL ST-6

PIPE BURSTING
SEE NOTE 5
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
PUMP STATION NO. 26

IMPROVEMENTS ARE

NOT PART OF THIS

CONTRACT
1 SD-01

9+75 10+00 11+00 12+00 13+00 14+00
SSMH-1
STA: 10+23.28
RIM: 254.49
SSMH-2
STA: 14+11.37
RIM: 248.35
MATCHLINE - 14+50
SEE DWG C-17
(250)
220
225
230
235
240
245
250
255
260
265
220
225
230
235
240
245
250
255
260
265
10+00 10+25 10+50 10+75 11+00 11+25 11+50 11+75 12+00 12+25 12+50 12+75 13+00 13+25 13+50 13+75 14+00 14+25 14+50 BEGIN
A08-010
STA: 10+23.28
RIM: 254.49
B08-143
STA: 14+11.37
10" INV IN: 242.14 (S)
RIM: 248.35
(EX) 8" PVC PIPE S: -3.57%
EX 12" RCP SD
STA: 13+89.53 -
IN EL: 243.31±
EG
MATCHLINE - 14+50
SEE DWG C-17
INV ELEV: 240.73
10" HDPE PIPE S: -1.61%
10" HDPE PIPE
S: -3.57%
(EX) 8" PVC PIPE S: -1.61%
10" INV OUT: 242.11 (N)
10" INV OUT: 248.39 (N)

17.9'

1.5" CLR
SEE NOTE 5
SEE NOTE 5
426.7'
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
NORTH
FILENAME: 2060D-C-16.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-16.DWG 11:25:224/22/24
C-16

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
BEGIN TO 14+50±
23-056
23 PLAN
1"=20'

PROFILE
1"=20' HORIZ
1"=5' VERT

SIERRA COLLEGE BLVD
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 8" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. VCP TO BE USED FOR OPEN CUT. WHERE OPTIONAL OPEN

CUT AREAS ARE COMBINED WITH MANDATORY OPEN CUT

AREAS BETWEEN MANHOLES, THE PIPE MATERIAL SHALL

BE A SIMILAR MATERIAL ALONG THAT ENTIRE SEGMENT,
MANHOLE TO MANHOLE. IF TRENCHLESS IS UTILIZED

THROUGH THE OPTIONAL AREAS, THEN HDPE/FPVC SHALL
BE USED IN MANDATORY OPEN CUT AREA. IF OPEN CUT IS

UTILIZED THROUGH OPTIONAL AREAS, THEN VCP SHALL
BE USED IN THE MANDATORY OPEN CUT AREA.

7. SEE DRAWING C-22 AND C-23 FOR WORK ZONE 2 PLAN.

8. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

CONTRACTOR SHALL REMOVE
(EX) SD RCP SEGMENT (BELL TO

BELL) DURING PIPE BURSTING

AND RE-LAY UPON COMPLETION
AS NEEDED.

CONTRACTOR SHALL

ENSURE SUFFICIENT

BREAKOUT OF (EX) SSMH

TO ACCOMMODATE SLOPE

TRANSITION AND

CLEARANCE OF
UPSTREAM SD.

A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

CAUTION

OVERHEAD

POWER LINE
1 SD-01

TRAFFIC LOOPS (TYP)

15+00 16+00 17+00 18+00 19+00
SSMH-4
STA: 17+96.67
RIM: 241.94
SSMH-3
STA: 15+61.02
RIM: 245.11
(245)
(242)(242)
(242)
(243)
(244)
(246)
(247)(248)
102.4°'

38.8°'
MATCHLINE - 14+50
SEE DWG C-16
MATCHLINE - 19+00
SEE DWG C-18
220
225
230
235
240
245
250
255
260
265
220
225
230
235
240
245
250
255
260
265
14+50 14+75 15+00 15+25 15+50 15+75 16+00 16+25 16+50 16+75 17+00 17+25 17+50 17+75 18+00 18+25 18+50 18+75 19+00 (EX) 8" PVC PIPE S: -3.57%
B08-196
STA: 15+61.02
10" INV IN: 236.76 (S)
RIM: 245.11
(EX) 8" PVC PIPE S: -0.43%
B08-113
STA: 17+96.67
12" INV OUT: 235.67 (N)
RIM: 241.94
(EX) 10" PVC PIPE S: -1.03%

1.4'±
(EX) 18" SD
STA: 16+31.51 -
IN EL: 238.58±

3.5'±

2.1'±

8.5'±
(EX) 54" W
STA: 16+45.23 -
IN EL: 228.20±
(EX) 12" W (SAN JUAN)
STA: 16+74.96 -
IN EL: 239.05±
(EX) 8" W
STA: 17+00.63 -
IN EL: 226.89±
MATCHLINE - 14+50
SEE DWG C-16
INV ELEV: 240.73
MATCHLINE - 19+00
SEE DWG C-18
INV ELEV: 234.61

RELOCATED PG&E
GAS LINE 6"
SEE NOTE 7
STA: 16+97.73 -
IN EL: 239.00±
(EX) DUCT BANK
STA: 16+96.74 -
IN EL: 234.79±
(EX) DUCT BANK
STA: 17+00.87 -
IN EL: 234.80±
2'±
1'±
(EX) CONCRETE ENCASEMENT OVER

ELECTRIC CONDUITS & AROUND DIP
SEWER
(EX) SAND BACKFILL
(EX) MICA INSULATING BOARD PLACED

BETWEEN GAS MAIN AND SAND
BACKFILL.4'-1"±
10" HDPE PIPE S: -3.57%
10" DIP PIPE S: -0.43%
12" HDPE PIPE S: -1.03%
10" INV IN: 235.72 (S)
10" INV OUT: 236.74 (N)
SEE NOTE 5
SEE NOTE 6
111.0' 235.6' 103.3'
(EX) UG
STA: 18+32.67 -
TOP EL: 238.68±
NORTH
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
FILENAME: 2060D-C-17.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-17.DWG 11:33:214/22/24
C-17

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
14+50 TO 19+00±
23-056
24 PLAN
1"=20'
EG
KEY NOTES:
(NOT ALL NOTES ARE REFERENCED ON EACH

DRAWING)

CONTRACTOR SHALL PROTECT EXISTING
WATER LINE IN PLACE. CENTER NEW STICK OF

SEWER PIPE AT WATER MAIN CROSSING PER

SAN JUAN WATER DISTRICT STANDARD WATER

AND SEWER LINE SEPARATION DETAIL ON DWG
SD-8.
1 SIERRA COLLEGE BLVD

EAST ROSEVILLE PARKWAY
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 8" SS DIP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

6. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING
UNLESS OTHERWISE NOTED.

7. (EX) GAS LINE TO BE RELOCATED TO THIS LOCATION
PRIOR TO THIS PROJECT. VERTICAL LOCATION IS NOT
BASED ON AS-BUILTS. CONTRACTOR TO VERIFY VIA
AS-BUILTS PRIOR TO CONSTRUCTION.

8. VCP TO BE USED FOR OPEN CUT. WHERE OPTIONAL OPEN

CUT AREAS ARE COMBINED WITH MANDATORY OPEN CUT

AREAS BETWEEN MANHOLES, THE PIPE MATERIAL SHALL

BE A SIMILAR MATERIAL ALONG THAT ENTIRE SEGMENT,
MANHOLE TO MANHOLE. IF TRENCHLESS IS UTILIZED

THROUGH THE OPTIONAL AREAS, THEN HDPE SHALL BE
USED IN MANDATORY OPEN CUT AREA. IF OPEN CUT IS

UTILIZED THROUGH OPTIONAL AREAS, THEN VCP SHALL
BE USED IN THE MANDATORY OPEN CUT AREA.

9. OPEN CUT TRENCHING SHALL BE PER ROSEVILLE
STANDARD DETAIL SS-1.

10.SEE DRAWING C-22, C-23 AND C-24 OR WORK ZONE 2, 3
AND 4 PLAN

11. CITY TO CORE AND INSTALL BELLS AT EXISTING
MANHOLES. CONTRACTORS SHALL COORDINATE WITH
CITY AND WAIT 24-HOURS PRIOR TO CONNECTION TO
BELL.

12.CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

MANDATORY OPEN CUT AND

CONCRETE ENCASED
SEE NOTE 9 OPEN CUT OPTIONALOPEN CUT OPTIONAL
1CONNECT TO

EXISTING SSMH
STD DTL 40 05 09.12

CONNECT TO

EXISTING SSMH
STD DTL 40 05 09.12

CONNECT TO CITY

INSTALLED BELL
(SEE NOTE 11)

CONNECT TO CITY

INSTALLED BELL
(SEE NOTE 11)
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

TRAFFIC LOOPS (TYP)
1 SD-01
1 SD-01

CAUTION

OVERHEAD

POWER LINE

CAUTION

OVERHEAD

POWER LINE

PROFILE
1"=20' HORIZ
1"=5' VERT

19+00 20+00
21+00
22+00
23+00
SSMH-5
STA: 19+96.14
RIM: 240.67
MATCHLINE - 23+50
SEE DWG C-19
MATCHLINE - 19+00
SEE DWG C-17
(241)
(241)
(242)(242)(242)
(242)
220
225
230
235
240
245
250
255
260
265
220
225
230
235
240
245
250
255
260
265
19+00 19+25 19+50 19+75 20+00 20+25 20+50 20+75 21+00 21+25 21+50 21+75 22+00 22+25 22+50 22+75 23+00 23+25 23+50 (EX) 10" PVC PIPE S: -1.03%
B08-105
STA: 19+96.14
12" INV OUT: 233.56 (N)
RIM: 240.68
(EX) 10" PVC PIPE S: -0.53%

2.0'±
EG
MATCHLINE - 19+00
SEE DWG C-17
INV ELEV: 234.61
MATCHLINE - 23+50
SEE DWG C-19
INV ELEV: 231.69
EX 24" SD
STA: 20+46.57 -
IN EL: 236.15±
12" HDPE PIPE S: -1.03%
12" HDPE PIPE S: -0.53%
12" INV IN: 233.62 (S)
SEE NOTE 5
SEE NOTE 5
450.0'
NORTH
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
FILENAME: 2060D-C-18.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-18.DWG 11:33:544/22/24
C-18

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
19+00 TO 23+50±
23-056
25 SIERRA COLLEGE BLVD
PLAN
1"=20'
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING.

6. SEE DRAWING C-24 FOR WORK ZONE 4 PLAN.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

PROFILE
1"=20' HORIZ
1"=5' VERT

24+00 25+00 26+00 27+00 28+00
12" W
12" W
24+00 25+00 26+00 27+00 28+00
SSMH-6
STA: 23+90.59
RIM: 241.97
SSMH-7
STA: 27+91.97
RIM: 243.75
BOV
(242)
(243)
(244)
MATCHLINE - 23+50
SEE DWG C-18
MATCHLINE - 28+00
SEE DWG C-20
220
225
230
235
240
245
250
255
260
220
225
230
235
240
245
250
255
260
23+50 23+75 24+00 24+25 24+50 24+75 25+00 25+25 25+50 25+75 26+00 26+25 26+50 26+75 27+00 27+25 27+50 27+75 28+00 B08-083
STA: 23+90.59
6" INV IN: 232.21 (E)
8" INV IN: 231.79 (SW)
12" INV IN: 231.47 (S)
RIM: 241.97
12" INV OUT: 231.33 (N)
(EX) 10" PVC PIPE S:- 0.53% (EX) 10" PVC PIPE S: -0.31% (EX) 10" PVC PIPE S: -0.31%
EX 12" W
STA: 23+75.86 -
IN EL: 236.19±
EX 30" SD
STA: 24+21.62 -
IN EL: 235.24±
EX 12" SD
STA: 25+90.06 -
IN EL: 239.37±
MATCHLINE - 23+50
SEE DWG C-18
INV ELEV: 231.69
MATCHLINE - 28+00
SEE DWG C-20
INV ELEV: 229.99
12" HDPE PIPE S: -0.53%
12" HDPE PIPE S:-0.31%
SEE NOTE 5 SEE NOTE 5
SEE NOTE 5
450.0'
EX 12" W
STA: 27+80.13 -
IN EL: 241.28±
B08-077
STA: 27+91.97
6" INV IN: 231.99 (E)
8" INV IN: 230.48 (SW)
RIM: 243.75
12" INV OUT: 230.02 (N)
12" INV IN: 230.10 (S)
NORTH
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
FILENAME: 2060D-C-19.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-19.DWG 11:34:364/22/24
C-19

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
23+50 TO 28+00±
23-056
26 3.8'± 3.0'±

7.8'± 10.3'±
EG

SIERRA COLLEGE BLVD
PLAN
1"=20'

PROFILE
1"=20' HORIZ
1"=5' VERT
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING.

6. SEE DRAWING C-24 FOR WORK ZONE 4 PLAN.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

28+00 29+00 30+00 31+00 32+00
12" W
4" W
28+00 29+00 30+00 31+00 32+00
W
W
ARV
ARV
WV
MATCHLINE - 28+00
SEE DWG C-19
(245)
(245)
SSMH-8
STA: 30+95.06
RIM: 245.00
MATCHLINE - 32+50
SEE DWG C-21
250.0'
215
220
225
230
235
240
245
250
255
260
215
220
225
230
235
240
245
250
255
260
28+00 28+25 28+50 28+75 29+00 29+25 29+50 29+75 30+00 30+25 30+50 30+75 31+00 31+25 31+50 31+75 32+00 32+25 32+50 (EX) 10" PVC PIPE S: -0.31%
B08-066
STA: 30+95.06
12" INV IN: 229.07 (S)
RIM: 245.00
(EX) 10" PVC PIPE S: -0.31%
EX 36" SD
STA: 29+49.61 -
IN EL: 239.21±
MATCHLINE - 28+00
SEE DWG C-19
INV ELEV: 229.99
MATCHLINE - 32+50
SEE DWG C-21
INV ELEV: 228.44
12" HDPE PIPE S: -0.31% 12" HDPE PIPE S: -0.31%
12" INV OUT: 228.92 (N)
6" INV IN: 230.95 (E)
SEE NOTE 5
SEE NOTE 5
200.0'

EX TEL
STA: 31+46.72 -
IN EL: 242.50±
NORTH
FILENAME: 2060D-C-20.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-20.DWG 11:35:074/22/24
C-20

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
28+00 TO 32+50±
23-056
27 8.7'±
EG

SIERRA COLLEGE BLVD
PLAN
1"=20'
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM CONSTRUCTION
RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE
TO EXISTING UTILITIES DURING CONSTRUCTION.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING.

6. SEE DRAWING C-24 AND C-25 FOR WORK ZONE 4 AND 5
PLAN.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

12.9'±
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

PROFILE
1"=20' HORIZ
1"=5' VERT

36+77
33+00 34+00
35+00
36+00
10" W
SSMH-9
STA: 34+14.88
RIM: 242.22
W
ARV
(235)
(240)
(245)
33+00 34+00 34+15
MATCHLINE - 32+50
SEE DWG C-20
215
220
225
230
235
240
245
250
255
260
215
220
225
230
235
240
245
250
255
260
32+50 32+75 33+00 33+25 33+50 33+75 34+00 34+25
(EX) 10" PVC PIPE S: -0.31%
B08-062
STA: 34+14.88
12" INV IN: 227.92 (S)
RIM: 242.22
EX 10" W
STA: 33+41.98 -
IN EL: 239.49
MATCHLINE - 32+50
SEE DWG C-20
INV ELEV: 228.44

EX UG UTILITIES
STA: 33+09.14 -
EL: 240.74±
12" HDPE PIPE S: -0.31%
6" INV IN: 229.93 (E)
12" INV OUT: 227.90 (N)
SEE NOTE 5
164.88'
NORTH
20 4020
SCALE 1"=20'
0 FEET
HORIZ
5 105
SCALE 1"=5'
0 FEET
VERT
FILENAME: 2060D-C-21.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\2060D-C-21.DWG 11:35:554/22/24
C-21

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SIERRA COLLEGE BLVD

PLAN AND PROFILE
32+50 TO END
23-056
28 10.5'±
EG

SIERRA COLLEGE BLVD

EUREKA RD
PLAN
1"=20'
SHEET NOTES:

1. PROVIDE 12" MIN CLEARANCE FROM OTHER UTILITIES
UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL EMPLOY BMP MEASURES TO

PROTECT EXISTING STORM DRAINS FROM
CONSTRUCTION RUNOFF.

3. IT IS THE CONTRACTORS RESPONSIBILITY FOR

DEVELOPING THE MEANS AND METHODS TO EMPLOY

DURING CONSTRUCTION TO REDUCE RISKS ASSOCIATED
WITH IMPINGEMENT INTO ADJACENT BURIED UTILITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE

TO EXISTING UTILITIES DURING CONSTRUCTION AND
FACILITIES NOT DESIGNATED FOR REMOVAL.

4. ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR

TO VERIFY ALL CONTROLLING ELEVATIONS AND
DIMENSIONS.

5. (EX) 10" SS VCP TO BE REPLACED VIA PIPE BURSTING.

6. SEE DRAWING C-25 FOR WORK ZONE 5 PLAN.

7. CONTRACTOR SHALL BE REQUIRED TO PRODUCE AND

DISTRIBUTE DOOR HANGER NOTIFICATION PER
SPECIFICATION 01 31 13 TO ALL AFFECTED BUSINESSES

AND RESIDENTS AS IDENTIFIED AT THE FREQUENCY
LISTED BELOW:
30 DAYS - DOOR HANGER, COMMERCIAL ONLY
14 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
7 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3 DAYS - DOOR HANGER, RESIDENTIAL AND COMMERCIAL

DAY OF - DOOR HANGER, RESIDENTIAL AND COMMERCIAL
3'±
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

PROFILE
1"=20' HORIZ
1"=5' VERT
1 SD-01

CP
L=171.7'
1+00 2+00
3+003+29

50.0' CLR

FROM EX TREE

STAGING

AREA 'A'

STAGING

AREA 'B'
9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 DETOUR
DETOUR
DETOUR

LANE CLOSURE
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 2060D-C-22.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\WORKZONES\2060D-C-22.DWG 11:38:284/22/24
C-22

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
WORK ZONE 1 AND 2
23-056
29 WORK ZONE 1 PLAN
1"=40'

SIERRA COLLEGE BLVD
WORK ZONE 2 PLAN
1"=40'
NORTH

SIERRA COLLEGE BLVD
L1=195.6'
L2=342.1'
LEGEND

PG&E POLE

WORK ZONE

TRAFFIC/BIKE LOOP

CONDUIT

STAGING AREA

EAST ROSEVILLE
PKWY

OLD AUBURN RD
STAGING AREA NOTES:

1. PLACE BRIGHTLY COLORED ESA FENCING

ALONG THE BOUNDARY AREA OF WHAT IS

UNSUITABLE FOR CONSTRUCTION/LAYDOWN
AREA.

2. ADDITIONAL LAYDOWN AREA IS AVAILABLE AT
1800 BOOTH ROAD. CONTRACTOR TO
COORDINATE WITH CITY OF ROSEVILLE.

WORK ZONE 1 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY-FRIDAY

2. WORK HOURS: DAY WORK IS ALLOWABLE

3. APPROX. WORK LENGTH: 438 LF

4. APPROX. WORK AREA: 13,000 SF

5. ANTICIPATED DURATION: 3 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING AND OPEN CUT

TRENCHING

7. ANTICIPATED TRAFFIC IMPACT: NONE

8. FLOW CONTROL: BYPASS PUMP

9. ANTICIPATED RESTORATION: SIDEWALK
REPAIR AND LANDSCAPE RESTORATION.

NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

WORK ZONE 2 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY -
FRIDAY

2. WORK HOURS: 9PM - 6AM; TCP IS TO BE TAKEN
OUT BY 6AM

3. APPROX. WORK LENGTH: 723 LF

4. APPROX. WORK AREA: 36,174 SF

5. ANTICIPATED DURATION: 4-5 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS AS SHOWN DURING
NIGHT WORK; STEEL PLATES SHALL SIT FLUSH

WITH EXISTING PAVEMENT AND BE PINNED

AND STAKED

8. FLOW CONTROL: BYPASS PUMP AT NIGHT AND

RECONNECT FOR DAY

9. RESTORATION PER "TRENCH RESTORATION
FOR MORATORIUM STREET" DETAIL ON SD-04.

MICROSURFACING PER CITY OF ROSEVILLE
"DIVISION V - SURFACING AND PAVEMENTS"

SPECIFICATION
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 DETOUR
DETOUR
DETOUR
DETOUR
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 9+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
DETOUR
DETOUR

LANE CLOSURE
DETOUR
DETOUR
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 2060D-C-23.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\WORKZONES\2060D-C-23.DWG 11:39:324/22/24
C-23

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
WORK ZONE 2 ALT AND 3
23-056
30 WORK ZONE 2 PLAN ALT
1"=50'

SIERRA COLLEGE BLVD

EAST ROSEVILLE
PKWY
NORTH
WORK ZONE 3 PLAN
1"=40'
L=537.78'
L=235.6'

SIERRA COLLEGE BLVD

EAST ROSEVILLE
PKWY
LEGEND

WORK ZONE

TRAFFIC/BIKE LOOP

CONDUIT
WORK ZONE 2 (ALT) NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY - FRIDAY

2. WORK HOURS: 9PM - 6AM; TCP IS TO BE TAKEN
OUT BY 6AM

3. APPROX. WORK LENGTH: 1,093 LF

4. APPROX. WORK AREA: 52,066 SF

5. ANTICIPATED DURATION: 4-5 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS AS SHOWN DURING
NIGHT WORK; STEEL PLATES SHALL SIT FLUSH

WITH EXISTING PAVEMENT AND BE PINNED

AND STAKED

8. FLOW CONTROL: BYPASS PUMP AT NIGHT AND

RECONNECT FOR DAY

9. RESTORATION PER "TRENCH RESTORATION
FOR MORATORIUM STREET" DETAIL ON SD-04.

MICROSURFACING PER CITY OF ROSEVILLE
"DIVISION V - SURFACING AND PAVEMENTS"
SPECIFICATION.

NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

WORK ZONE 3 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY - FRIDAY

2. WORK HOURS: 9PM - 6AM; TCP IS TO BE TAKEN
OUT BY 6AM

3. APPROX. WORK LENGTH: 236 LF

4. APPROX. WORK AREA: 13,507 SF

5. ANTICIPATED DURATION: 3-5 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

OPEN CUT

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS AS SHOWN DURING
NIGHT WORK; STEEL PLATES SHALL SIT FLUSH

WITH EXISTING PAVEMENT AND BE PINNED AND
STAKED

8. FLOW CONTROL: BYPASS PUMP AT NIGHT AND

RECONNECT FOR DAY

9. RESTORATION PER "TRENCH RESTORATION
FOR MORATORIUM STREET" DETAIL ON SD-04.

MICROSURFACING PER CITY OF ROSEVILLE
"DIVISION V - SURFACING AND PAVEMENTS"
SPECIFICATION.

A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

L1=591.9'
15+00 16+00 17+00
18+00
19+00 20+00 21+00 22+00 23+00 24+00 25+00LANE CLOSURE
MATCHLINE - 24+00

SEE BELOW LEFT
MATCHLINE - 24+00 SEE

ABOVE RIGHT
L2=401'
23+00 24+00 25+00 26+00 27+00
28+00
29+00 30+00 31+00 32+00
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 2060D-C-24.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\WORKZONES\2060D-C-24.DWG 11:41:014/22/24
C-24

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
WORK ZONE 4
23-056
31 WORK ZONE 4 PLAN
1"=40'

SIERRA COLLEGE BLVD

E ROSEVILLE PKWY
NORTH

SIERRA COLLEGE BLVD
WORK ZONE 4 PLAN
1"=40'
LEGEND

WORK ZONE

TRAFFIC/BIKE LOOP

CONDUIT
WORK ZONE 4 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY - FRIDAY

2. WORK HOURS: 9PM - 6AM; TCP IS TO BE TAKEN
OUT BY 6AM

3. APPROX. WORK LENGTH: 1,294 LF

4. APPROX. WORK AREA: 61,550 SF

5. ANTICIPATED DURATION: 4-5 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS AS SHOWN DURING
NIGHT WORK; STEEL PLATES SHALL SIT FLUSH

WITH EXISTING PAVEMENT AND BE PINNED AND
STAKED

8. FLOW CONTROL: BYPASS PUMP AT NIGHT AND

RECONNECT FOR DAY

9. RESTORATION PER "TRENCH RESTORATION
FOR MORATORIUM STREET" DETAIL ON SD-04.

MICROSURFACING PER CITY OF ROSEVILLE
"DIVISION V - SURFACING AND PAVEMENTS"
SPECIFICATION.

NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

MATCHLINE - 30+00

SEE BELOW LEFT
22+00 23+00 24+00 25+00 26+00 27+00
28+00
29+00 30+00 31+00
L1=303.1'
DETOUR

LANE CLOSURE
MATCHLINE - 30+00

SEE ABOVE RIGHT
34+15
30+00 31+00 32+00 33+00 34+00
L1=303.1'
L2=319.8'
DETOUR

DETOUR/TAPERED LANE
40 8040
SCALE 1"=40'
0 FEET
HORIZ
NORTH
FILENAME: 2060D-C-25.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\21060 - DRAWINGS\WORKZONES\2060D-C-25.DWG 11:44:254/22/24
C-25

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
WORK ZONE 5
23-056
32 WORK ZONE 5 PLAN
1"=40'

SIERRA COLLEGE BLVD

EUREKA RD
NORTH

SIERRA COLLEGE BLVD
WORK ZONE 5 PLAN
1"=40'
LEGEND

WORK ZONE

TRAFFIC/BIKE LOOP

CONDUIT
WORK ZONE 5 NOTES:

1. CONSTRUCTION WORK DAYS: SUNDAY - FRIDAY

2. WORK HOURS: 9PM - 6AM; TCP IS TO BE TAKEN
OUT BY 6AM

3. APPROX. WORK LENGTH: 927 LF

4. APPROX. WORK AREA: 38,369 SF

5. ANTICIPATED DURATION: 4-5 DAYS PLUS

SURFACE RESTORATION

6. ANTICIPATED METHOD OF CONSTRUCTION:

STATIC PIPE BURSTING

7. ANTICIPATED TRAFFIC IMPACT: LANE

CLOSURES AND DETOURS AS SHOWN DURING
NIGHT WORK; STEEL PLATES SHALL SIT FLUSH

WITH EXISTING PAVEMENT AND BE PINNED AND
STAKED

8. FLOW CONTROL: BYPASS PUMP AT NIGHT AND

RECONNECT FOR DAY

9. RESTORATION PER "TRENCH RESTORATION
FOR MORATORIUM STREET" DETAIL ON SD-04.

MICROSURFACING PER CITY OF ROSEVILLE
"DIVISION V - SURFACING AND PAVEMENTS"
SPECIFICATION.

NOTES:

1. SEE SPECIFICATION SECTION 01 14 03 FOR
ADDITIONAL CONSTRAINTS.

A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

PLACE NON-SHRINK GROUT

IN SPACE BETWEEN PIPE

AND MANHOLE BASE

MODULAR SEAL BETWEEN

MANHOLE WALL AND PIPE
O.D. SHALL BE LINK SEAL
MODEL LS-575-S-316-30 OR

APPROVED EQUAL

EXISTING MANHOLE

NON-SHRINK GROUT

INTERIOR FACE OF
MODULAR SEAL.

EXTEND PIPE THROUGH
EXISTING MANHOLE. REMOVE

TOP HALF OF PIPE IN MANHOLE
TO CREATE CHANNEL.

THROUGH

LEVEL ALL THE

WAY AROUND
SEE NOTE 3
12" MIN CONTRACTOR TO BREAK

OUT EXISTING MANHOLE

TO ACCOMMODATE

TRENCHLESS

CONSTRUCTION

EXISTING MANHOLE

MODULAR SEAL BETWEEN

MANHOLE WALL AND PIPE
O.D. SHALL BE LINK SEAL
MODEL LS-575-S-316-30 OR

APPROVED EQUAL

REHAB CHANNEL WITH NON-SHRINK GROUT

AND BENCH TO PROVIDE SMOOTH

CONSTANT SLOPE TRANSITION FROM NEW

TO EXISTING PIPE (TYP BOTH SIDE OF

MANHOLE)

MODULAR SEAL

BETWEEN MANHOLE
WALL AND PIPE O.D.
(TYP)

EXISTING MANHOLE

REHAB CHANNEL AND

BENCH TO PROVIDE

SMOOTH CONSTANT SLOPE

TRANSITION FROM NEW TO

EXISTING PIPE
SEE NOTE 3
NOTE:

1. HOLE IN THE MANHOLE WALL TO BE CORE DRILLED. SIZE OF CORE DRILLED HOLE PER THE RECOMMENDATION OF THE MANUFACTURER OF THE MODULAR SEAL TO ALLOW PROPER FIT.

2. ANY CONNECTIONS MADE OUTSIDE OF THE MANHOLE SHALL BE MADE WITH AN ELECTROFUSION MACHINE, AN ELECTROFUSION COUPLING, OR APPROVED EQUAL.

MANHOLE
SEE NOTE 1
12"
6"
12" 12"
(N) HDPE

SEWER PIPE
(N) HDPE

SEWER PIPE

CLSM OVER COUPLING

CONNECT NEW SEWER PIPES WITH

MANUFACTURED ELECTROFUSION

COUPLING FOR HDPE PIPE
SEE NOTE 2

NON-SHRINK GROUT INTERIOR FACE

OF MODULAR SEAL

PLACE NON-SHRINK GROUT IN SPACE

BETWEEN PIPE AND MANHOLE BASE

AND SLOPE PER EXISTING

MODULAR SEAL BETWEEN MANHOLE WALL
AND PIPE O.D. SHALL BE LINKSEAL MODEL
LS-400-S-316-10 OR APPROVED EQUAL

CONTRACTOR SHALL KEEP MAXIMUM
OF 1
4" SPACING BETWEEN THE NEW

STUB AND END OF BURSTING PIPE
NOTES:

1. HOLES IN EXISTING MANHOLES TO BE
CORE DRILLED. SIZE OF CORE DRILLED

HOLE PER THE RECOMMENDATION OF

THE MANUFACTURER OF THE

MODULAR SEAL TO ALLOW PROPER
FIT.

2. ALLOW MINIMUM 48 HOUR RELAXATION

PERIOD AFTER BURST, PRIOR TO
INSTALLING MODULAR SEAL. SEE

TECHNICAL SPECIFICATIONS SECTION
33 05 26 GRAVITY SANITARY SEWER

PIPE BURSTING AND HIGH DENSITY

POLYETHYLENE PIPE FOR ADDITIONAL
DETAILS.

3. ANY CONNECTIONS MADE OUTSIDE OF

THE MANHOLE SHALL BE MADE WITH

AN ELECTROFUSION MACHINE, AN

ELECTROFUSION COUPLING, OR
APPROVED EQUAL. PIPE BETWEEN
MANHOLES.

NOTES:

1. FLOW SHALL BE MAINTAINED DURING CONSTRUCTION.

2. SEE STD DTL 33 05 61.14 FOR BASE SECTION FOR PRECAST CONCRETE MH ON EXIST PIPE.

3. DOGHOUSE MANHOLES SHALL BE USED WHERE REQUIREMENTS FOR

TIE-INS TO EXISTING SEWERS

PROPOSED SEWER LINE

CORE MANHOLE EXISTING SEWER MAIN
21" INV IN: 139.33 (N)
21" INV OUT: 139.33( S)
15" INV OUT: 139.50 (E)
4'-0" FOR 8" to 12" MAINS
5'-0" FOR 15" TO 30" MAINS
6'-0" FOR 36" TO 54" MAINS
6" MAX.

SECTION A

SAWCUT TO SPRINGLINE
GROUT 6" MAX.
4'-0" FOR 8" to 12" MAINS
5'-0" FOR 15" TO 30" MAINS
6'-0" FOR 36" TO 54" MAINS
6" MAX.

SECTION A

SAWCUT TO SPRINGLINE
GROUT 6" MAX.

EXIST SS LATERAL

CORE MANHOLE
10" INV IN: 144.97 (W)
10" INV OUT: 144.97 (E)

SS LAT IN

INSTALL CONCRETE PLUG ON

EXISTING SEWER
NOTES:

1. FLOW SHALL BE MAINTAINED DURING CONSTRUCTION.

2. SEE STD DTL 33 05 61.14 FOR BASE SECTION FOR PRECAST CONCRETE MH ON EXIST PIPE.

3. DOGHOUSE MANHOLES SHALL BE USED WHERE REQUIREMENTS FOR

TIE-INS TO EXISTING SEWERS
FILENAME: 23056D-SD-01.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-01.DWG 11:45:584/22/24
SD-01

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
STANDARD DETAILS 1
23-056
33 1
-- NTS
MANHOLE TO HDPE PIPE CONNECTION DETAIL 2
-- NTS

TRENCHLESS PIPE THROUGH MANHOLE DETAIL

PLAN VIEW
A
-
B
-

SECTION A SECTION B
A
--
A
--
A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
3 C-02 1" = 4'
STA 10+00 (SSMH-01 HICKORY & PORTER) 4
C-02 1" = 4'
STA 53+45.68 (SSMH-02 HICKORY NEAR ATKINSON)

PRECAST CONCRETE

MANHOLE BASE
PER ASTM C478
65"
24"
165.65"
127.20" 7.0" 7.49"

FRP BASELINER
4" WIDE X 1.5" THICK

POLYPROPYLENE

WEIR BLOCKS
18"X18" 316 SS SLUICE GATE
GOLDEN HARVEST GH-46-NRS

OR APPROVED EQUAL

STEM EXTENSION
& SUPPORT BRACKET
60" PVC RISER

PRECAST CONCRETE
LID ASTM C478

CONCRETE GRADE RINGS

PER CITY OF ROSEVILLE
STD DTL SS-2
24"
ID 59.20"
OD 61.63"

TELESCOPIC ACCESS

COLLAR (SEE DETAIL)

4.00"
B
--
A
--
C
--

2.0"
RIM EL. 205.56

STANDARD SEWER MANHOLE FRAME

AND COVER PER CITY OF ROSEVILLE
STD DTL SS-2

PREDL BELL & GASKET
OR EQUAL (TYP).
12" MIN
TYP

CLASS II AB OR CLSM PLACED IN
MAXIMUM 8-INCH LOOSE LIFTS AND
COMPACTED TO A MINIMUM OF 95%

RELATIVE COMPACTION SEE
EXCAVATION NOTE 1.

MATCH (EX) SIDEWALK
2" NUT

2.00"

15.76"
60" PVC RISER

TELESCOPIC
ACCESS
COLLAR
MASTIC

GRADE RINGS
AS REQ.

FRP COLLAR WITH

GASKET SEAT

FLAT TOP LINERCOLLAR
GASKET

JOINT WRAP

PVC PIPE RISERFRP BASELINER

MASTIC SEALANT

MASTIC SEALANT

EXTERNAL JOINT
WRAP

PVC PIPE RISER

FRP LID SLAB LINER
FILENAME: 23056D-SD-02.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-02.DWG 11:46:454/22/24
SD-02

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
PUMP STATION 26

WEIR MANHOLE DETAIL
23-056
34 SECTION A-A
- 1" = 1'-0"

PLAN VIEW
1" = 1'-0"
A
-
A

PREDL PVC MANHOLE SPECIFICATIONS
ALL "PIPE TO MANHOLE" CONNECTIONS SHALL HAVE GASKETS
AS SHOWN IN THE DRAWINGS UNLESS OTHERWISE NOTED.

PREDL SYSTEMS OR APPROVED EQUAL WILL ONLY
RECOMMEND WHAT TYPE OF GASKET SHALL BE USED.

1. ALL PIPE GASKETS SHALL BE INSTALLED USING THE

MANDREL RECOMMENDED BY THE GASKET
MANUFACTURER.

2. ONLY PREDL CERTIFIED WELDERS AND FABRICATORS ARE

AUTHORIZED TO FABRICATE, REPAIR, WELD, OR TEST THE
BASELINER, TELESCOPIC ACCESS COLLAR, AND LID LINERS.

3. ALL SECTIONS SHALL BE SEALED TOGETHER AS PER THE

MANUFACTURER INSTRUCTIONS UNLESS OTHERWISE
NOTED.

4.LINER AND PVC RISER ARE NOT TO BE COMPROMISED BY

DRILLING OR PUNCTURING UNLESS SPECIFIED AND

APPROVED BY PREDL LINER MANUFACTURER OR
APPROVED EQUAL. PERFORATION OF LINER TO INSTALL
LADDER RUNGS IS NOT RECOMMENDED.

5. ROUND PRECAST MANHOLES TYPICALLY DESIGNED TO
ASTM C478. NON-ROUND MANHOLE STRUCTURES
TYPICALLY DESIGNED TO ASTM C913.

6. PRECAST CONCRETE STRUCTURE WITH INTEGRAL PREDL

CPL OR APPROVED EQUAL TO BE VACUUM TESTED IN
ACCORDANCE WITH ASTM C1244 PRIOR TO FINAL
INSTALLATION AND SPARK TESTING OF CPL.

IE OUT 193.68
IE IN 194.01

TELESCOPIC ACCESS COLLAR DETAIL C
-- NTS

JOINT DETAIL B
-- NTS

JOINT DETAIL A
-- NTS
EXCAVATION NOTES:

1. IF SUBGRADE IS FOUND TO BE SOFT, LOOSE, DISTURBED

BY CONSTRUCTION, YIELDING, OR UNSTABLE, SUBGRADE

SHALL BE OVEREXCAVATED TO SUCH A DEPTH THAT FIRM

AND UNYIELDING SUBGRADE CAN BE ESTABLISHED BY
INSTALLING A MINIMUM OF 12 INCHES OF CLEAN, DURABLE,
NATURAL, 1.5-INCH CRUSHED DRAIN ROCK WRAPPED WITH
GEOTEXTILE FABRIC (MIRAFI 140N OR EQUAL).

A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FILENAME: 23056D-SD-03.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-03.DWG 11:48:084/22/24
SD-03

CIVIL A CORREA

A CORREA

K ALACON

K ALACON
STANDARD DETAILS 2
23-056
35 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

FILENAME: 23056D-SD-04.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-04.DWG 11:51:094/22/24
SD-04

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CITY OF ROSEVILLE

TRENCH BACKFILL STANDARD DETAILS
23-056
36 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FILENAME: 23056D-SD-05.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-05.DWG 11:51:524/22/24
SD-05

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CITY OF ROSEVILLE

STREET STANDARD DETAILS
23-056
37 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FILENAME: 23056D-SD-06.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-06.DWG 11:52:394/22/24
SD-06

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CITY OF ROSEVILLE

TRAFFIC SIGNAL STANDARD DETAILS
23-056
38 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
FILENAME: 23056D-SD-07.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-07.DWG 11:53:234/22/24
SD-07

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

CITY OF ROSEVILLE

SANITARY SEWER STANDARD DETAILS
23-056
39 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A

FILENAME: 23056D-SD-08.DWG PLOT DATE: PLOT TIME:JOB NUMBER:

L:\CAD\PROJECTS\23-056 ROSEVILLE CHURCH ST SEWER IMPROVEMENTS\07 DRAWINGS\23056D-SD-08.DWG 11:56:194/22/24
SD-08

CIVIL A CORREA

A CORREA

K ALACON

K ALACON

SAN JUAN WATER DISTRICT

WATER STANDARD DETAILS
23-056
40 A
B
C
654321
D
DESIGN
DRAWN

CHECKED

APPROVED
DATE

PROJECT NUMBER

DRAWING NUMBER

SHEET NUMBER
Drink
ng
t
i
W
r
2260 Douglas Blvd, Suite 105Roseville, CA 95661916-780-2888 APRIL 2024
23-056

CITY OF ROSEVILLE

CHURCH STREET AND
PUMP STATION 26 COLLECTIONS

SYSTEM IMPROVEMENTS PROJECT

ROSEVILLE, CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

C I V I L STATE OF CALIFORNIA
KRISTINA-MARIE P. ALACONNo. C70952
04-17-23
D
C
B
A
City of Roseville California RFP#08-139
Church Street and Pump Station 26 Collection System Improvements [B:EU/EU-PROJECTS/Admin/Forms/Buildings&Grounds Project Manual: 01/24/24]

SPECIFICATIONS FOR CONSTRUCTION
Specifications for the Construction of the City of Roseville Church Street and Pump Station 26 Collection System Improvements Prepared for
By
April 2024

WWE Project No. 23-056

DOCUMENTS FOR THE CONSTRUCTION OF

CITY OF ROSEVILLE

CHURCH STREET AND PUMP STATION 26 COLLECTIONS SYSTEM

IMPROVEMENTS PROJECT

RFP #08-139

TECHNICAL SPECIFICATIONS
(DIVISIONS 01-40)

APRIL 2024

Bid Submittal

ENGINEER:

WATER WORKS ENGINEERS, LLC.

CONTACT:

Mike Fisher, P.E.
(916) 780-2888

THIS PAGE IS INTENTIONALLY BLANK

TOC-1
Table of Contents
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

TABLE OF CONTENTS

SECTION TITLE

DIVISION 1
01 11 03 SUMMARY OF WORK
01 14 03 SPECIAL PROJECT CONSTRAINTS
01 29 03 MEASUREMENT AND PAYMENT
01 31 13 COORDINATION
01 31 19 PROJECT MEETINGS
01 32 13 PROGRESS SCHEDULE
01 33 03 SUBMITTAL PROCEDURES
01 33 03.13 O&M MANUAL REVIEW CHECKLIST
01 42 03 REFERENCE STANDARDS AND ABBREVIATIONS
01 45 03 QUALITY CONTROL
01 51 03 TEMPORARY CONSTRUCTION FACILITIES AND UTILITIES 01 57 03 TEMPORARY SEWER BYPASS PUMPING
01 61 03 GENERAL PRODUCT REQUIREMENTS
01 71 13 MOBILIZATION
01 74 03 CLEANING
01 75 06 TESTING, TRAINING AND STARTUP
01 77 03 OPERATIONAL COMPLETION AND PROJECT CLOSEOUT

DIVISION 2
02 41 03 DEMOLITION

DIVISION 3
03 21 03 CONCRETE REINFORCEMENT
03 30 03 CAST-IN-PLACE CONCRETE
03 60 03 GROUT

DIVISION 5
05 05 06 ANCHORS, INSERTS AND DOWELS

DIVISION 7
07 92 03 JOINT SEALANTS

DIVISION 9
09 91 03 PAINTING

DIVISION 31
31 05 03 EARTHWORK
31 11 03 SITE PREPARATION

DIVISION 32
32 12 16 ASPHALT CONCRETE PAVEMENT

DIVISION 33
33 01 21 SEWER PIPELINE CLEANING
33 01 31 SEWER PIPELINE CCTV INSPECTION

TOC-2
Table of Contents
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION TITLE

33 05 13 HYBRID PVC SANITARY SEWER MANHOLE
33 05 26 GRAVITY SANITARY SEWER PIPE BURSTING

DIVISION 40
40 05 06 PIPING SPECIALTIES
40 05 10 PIPE AND FITTINGS
40 05 10.01 PIPE SCHEDULE
40 05 03.19 PSDS - DUCTILE IRON PROCESS PIPE (DIP)
40 05 33.12 PSDS – FUSIBLE HDPE PIPE (HDPE)
40 05 41 PSDS – VITRIFIED CLAY PIPE (VCP)
40 05 58 FABRICATED SLIDE GATES

CITY STANDARD SPECIFICATIONS
SECTION 37 DIVISION V SURFACINGS AND PAVEMENTS

++ END OF SECTION ++

01 11 03-1
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 11 03

SUMMARY OF WORK
PART 1 - GENERAL

1.1 LOCATION AND DESCRIPTION OF WORK
A. Schedule A of the Work is located along:

1. Hickory Street between Porter Drive and Atkinson Street a. Install new 15” VCP sewer gravity main along Hickory St. connecting SMH C04- 203 to Porter Drive and abandoning 10” gravity sewer main connection SMH C04- 203 to SMH C04-204

2. Atkinson Street between West Duranta Street and Hickory Street a. Upsize existing 10” sewer gravity main along Atkinson St. to 14” HDPE from SMH C04-203 to SMH C04-136

3. Church Street between Atkinson Street and Birch Street a. Upsize existing 12” sewer gravity main along Church St. to 18” HDPE from SMH B04-006 to SMH C04-197
b. Upsize existing 10” sewer gravity main along Church St. to 14” HDPE from SMH C04-197 to SMH C04-183
B. Schedule B of the Work is located along Sierra College Boulevard and Rockwood Court and Eureka Road and just past Old Auburn Road in Roseville, California 95661. The Work covers the replacement of existing 8” and 10” PVC gravity sewer pipes via pipe bursting and open cut methods as well as improvements upstream of Pump Station #26 located at 9705 Sierra College Blvd., Roseville, CA 95661.

1. Work Zone 1:
a. Open cut replacement of approximately 21 LF of 10” DIP gravity sewer line with 12” VCP
b. Pipe bursting of approximately 172 LF of existing 10” DIP gravity sewer line with 12” HPDE pipe
c. Construction of a weir manhole

2. Work Zone 2
a. Pipe bursting of approximately 538 LF of existing 8” DIP gravity sewer line with 10” HDPE pipe to be done in segments delineated by manholes A08-010 and B08- 196.

3. Work Zone 3
a. Open Cut replacement of approximately 236 LF of existing 8” DIP gravity sewer line with 10” DIP to be done manhole B08-196 to manhole B08-113.

4. Work Zone 4
a. Pipe bursting of approximately 1204 LF of existing 10” VCP gravity sewer line with 12” HDPE pipe to be done in segments delineated by manholes B08-105, B08-083, and B08-077.

5. Work Zone 5
a. Pipe bursting of approximately 415 LF of existing 10” VCP gravity sewer line with 12” HDPE pipe to be done in segments delineated by manholes B08-077 and B08- 062.

C. Project Management and Administration:
a. Preparing and providing submittals.

01 11 03-2
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

b. Maintaining project schedule.
c. Maintaining As-Built Contract Drawings on a continuous basis. d. Preparing Requests for Information.
e. Startup, testing, training and project closeout tasks to provide a complete and functional system.

D. The Project features sole -source pre-purchase by the OWNER of some of the major equipment. The CONTRACTOR shall be responsible for the acceptance, handling, installation and startup of this and all other equipment for the Project.

E. The Project has two schedules:

1. Schedule A includes the improvements along Sierra College Blvd. and upstream of Pump Station #26

2. Schedule B includes the improvements along Hickory Street, Atkinson Street and Church Street

1.2 PROJECT DOCUMENTS
A. The Work is described in the following project documents:

1. Volume 1 – City of Roseville Buildings & Grounds Project Manual

2. Volume 2 – Technical Specifications

3. Volume 3 – Drawings
B. Refer to the Contract Documents for the following supplemental information referenced from the Drawings and Specifications:

1. Draft Geotechnical Report – Church Street Sewer Improvements by Bajada Geosciences, Inc. (January 2024)

2. Geotechnical Report – Sewer Pump Station No. 26 Improvements by Bajada Geosciences, Inc. (December 2022)

1.3 COORDINATION
A. The CONTRACTOR shall be solely responsible for coordination of all of the Work of this Contract.

B. The CONTRACTOR shall supervise, direct and cooperate fully with all Subcontractors, manufacturers, fabricators, suppliers, distributors, installers, testing agencies and all others whose services, materials or equipment are required to ensure completion of the Work within the Contract Time.

C. Work of Others:

1. The CONTRACTOR shall cooperate with and coordinate CONTRACTOR’s Work with the work of any other contractor, utility service companies, or CITY’s representatives performing work at the site.

2. The CONTRACTOR shall also coordinate their Work with the work of others to assure compliance with schedules.

3. The CONTRACTOR shall attend and participate in all project coordination or progress meetings and report on the progress of all Work and compliance with schedules.

4. If any part of the work depends upon the work of others for proper execution or results, the CONTRACTOR shall inspect and promptly report to the ENGINEER any

01 11 03-3
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

apparent discrepancies or defects in such work of others that render it unsuitable for such proper execution and results.

5. Failure of the CONTRACTOR to so inspect and report shall constitute an acceptance of the work of others as fit and proper except as to defects which may develop in the work of others after execution of the work by the CONTRACTOR.

D. Interference with work on utilities:

1. The CONTRACTOR shall cooperate fully with all utility forces of the CITY or forces of other public or private agencies engaged in the relocation, altering, repair, or otherwise rearranging of any facilities which interfere with the progress of the work.

2. The CONTRACTOR shall schedule the work so as to minimize interference with said relocation, altering, repair, or other rearranging of facilities.

E. Responsibility for Damage:

1. The CONTRACTOR shall not be responsible for damage done by CONTRACTORS not under their jurisdiction.

2. The CONTRACTOR will not be liable for any such loss or damage, unless it is through the negligence of the CONTRACTOR.

See Section 01 31 13 for additional Coordination requirements.

1.4 COORDINATION WITH PROPERTY OWNERS – PUBLIC RELATIONS PLAN A. Maintaining good public relations with property owners and residents that use the streets affected by construction is an important component of this project. In order to maintain good public relations, the CONTRACTOR shall prepare and employ a public relations plan.

A written copy of the plan shall be prepared and presented to the OWNER for approval at the pre -construction conference and shall address the following minimum requirements.

1. The CONTRACTOR shall provide a Public Relations Supervisor. The Public Relations Supervisor shall be responsible for interfacing with the public throughout the project and resolving complaints and concerns of property owners adjacent to the work. The name and resume of the proposed Public Relations Supervisor shall be presented to the ENGINEER at the pre-construction conference for approval. The Public Relations Supervisor shall:
a. have a 24-hour access phone number to respond to complaints b. have the authority to direct the work as required to resolve concerns and complaints;
c. provide an updated progress schedule to the ENGINEER on a weekly basis; d. ensure all notification to adjacent property owners are made as described in the contract documents;
e. within 60 minutes of being notified, contact any property owners who have called with complaints or expressed concerns;
f. resolve all companies and expressed concerns within 24 hours; g. follow-up with individuals or entities making complaints 24 hours after resolution to ensure satisfactory results are obtained;
h. document all complaints in a public relations log, including name, address and contact information of individual or entity, date and time of initial notification, nature of complaint, actions taken to resolve the complaint, date and time of complaint resolution, and date and time of follow-up actions; and i. provide a weekly copy of the public relations log to the ENGINEER of all complaints and actions taken to resolve them;

01 11 03-4
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

j. be listed with name and phone number on all project flyers, notifications, and project signs.

1.5 WORK BY OTHERS
A. The CITY will perform the following work:

1. Operation of all existing system appurtenances and equipment, unless specified otherwise.

2. Installation of bells at existing manholes and structures.

B. PG&E

1. PG&E to hold PG&E pole in front of PS-26 during pipe bursting operations.

1.6 SITE CONDITIONS
A. Site Investigation and Representation

1. The CONTRACTOR acknowledges that it has satisfied itself as to the nature and location of the work, the general and local conditions, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncer tainties of weather , or similar physical conditions at the site, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during the prosecution of the work and all other matters which can in any way affect the work or the cost thereof under this Contract.

2. The CONTRACTOR further acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials to be encountered from inspecting the site and from evaluating information derived from exploratory work that may have been done by the CITY or included in these Contract Documents. Any failure by the CONTRACTOR to become acquainted with all the available information will not relieve the CONTRACTOR from responsibility for properly estimating the difficulty or cost of successfully performing the work or for properly installing the Work.

3. Field Verification:
a. Before undertaking each part of the work, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements.
b. As the work proceeds, the CONTRACTOR shall field verify the depth and location of all buried utilities, and existing systems, and location of hazardous waste and contaminants.
c. The CONTRACTOR shall promptly report in writing to the ENGINEER any conflict, error, or discrepancy which the CONTRACTOR may discover and shall obtain a written interpretation or clarification from the ENGINEER before proceeding with any work affected thereby.

B. Existing Utilities and Improvements

1. Location of Underground Utilities:
a. Known existing underground conduits, pipelines and other utilities have been shown on the contract drawings in their approximate locations (within 3 feet of actual location). However, the accuracy or completeness of utilities indicated on the drawings is not guaranteed.
b. It shall be the responsibility of the CONTRACTOR to determine the exact location of all utilities and their service connections.

01 11 03-5
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. All potholing or other procedures for verifying utility location shall be performed by the CONTRACTOR as necessary to prepare for excavation at least 4 working days in advance of scheduled excavation.
d. The CONTRACTOR shall immediately notify the ENGINEER as to any utility located by him which has been incorrectly shown or omitted from the Drawings. e. If the CONTRACTOR cannot locate an underground utility whose presence is indicated on the Drawings, the ENGINEER shall be notified in writing. f. The CONTRACTOR shall ascertain the exact locations of underground utilities whose presence is indicated o n the Drawings. T he locations of their service laterals work and of service laterals or appurtenances of any other underground utilities which can be inferred from the presence of visible facilities such as buildings, meters and junction boxes shall be obtained prior to doing work that may damage such utilities or interfere with their service. g. Utilities Not Shown on Drawings:
1) Attention is directed to the possible existence of underground utilities not indicated on the Drawings and to the possibility that underground utilities may be in a location different from that indicated on the Drawings. 2) If the ENGINEER determines that the underground utility for which such notice has been given has not been depicted on the Drawings with reasonable accuracy (within 3 feet of actual location), the additional cost incurred in locating the utility will be paid for as extra work as provided in the Agreement.
3) If the CONTRACTOR discovers a buried utility not indicated on the Drawings, the CONTRACTOR shall immediately give the ENGINEER and the Utility Company written notification of the existence of such utility. 4) Such utilities shall be located and protected from damages as directed by the ENGINEER and the cost of such work will be paid for as extra work as provided in the Agreement.

2. Utility Coordination:
a. The CONTRACTOR shall notify Underground Service Alert (USA ) at least 4 days prior to excavation, telephone (800) 642-2444.
b. The CONTRACTOR shall also contact all utility owners not registered with USA but known to have utilities in the project area to field locate underground utilities at least 4 days prior to excavation.
c. The CONTRACTOR shall notify all owners of utilities when the Work is in progress and shall make arrangements as are necessary to coordinate outages or make any emergency repairs.
d. Existing utilities that are shown or that are made known and located to the CONTRACTOR prior to excavation, and that are to be retained; and all utilities that are constructed during excavation operations shall be properly supported and protected from damage during the progress of the work.

3. Utility Protection and Damage:
a. Existing utilities that are shown or that are made known and located to the CONTRACTOR prior to excavation, and that are to be retained, and all utilities that are constructed during excavation operations shall be properly supported and protected from damage during the progress of the work. b. Should any damage to a utility occur during the progress of the work, the CONTRACTOR shall notify the CITY or the utility owner at once and render all assistance possible to repair the damage and restore the service.

01 11 03-6
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. No extra compensation will be made for the repair of any services or utility damaged by the CONTRACTOR nor for any damage incurred through neglect or failure to provide adequate protection to existing utilities. d. The provisions of this Section shall not be abated even in the event such damage occurs after backfilling or is not discovered until after completion of the backfilling.
e. Damage Report:
1) If the CONTRACTOR damages any underground utilities not shown on the Drawings or not depicted on the Drawings with reasonable accuracy (within 3 feet of actual location) or any lateral service the location of which could not be inferred by the CONTRACTOR, a written report thereof shall be made immediately to the ENGINEER by CONTRACTOR.
2) The CONTRACTOR's report shall also advise the ENGINEER of any schedule delays as a result of utility damages . Compensation for such delays w ill be determined in accordance with the Agreement. The CONTRACTOR shall be entitled to no other compensation for any such damage.

4. All utilities encountered along the line of the work shall remain continuously in service during all work under the Contract, unless otherwise shown on the drawings, or unless other arrangements satisfactory to the ENGINEER are made with the owner of said utilities.

C. CONTRACTOR's Responsibility for Utility Facilities and Service

1. Where the CONTRACTOR's operations could cause damage or inconvenience to railway, telephone, television, power, oil, gas, water, sewer, or irrigation systems, the CONTRACTOR shall make all arrangements necessary for the protection of these utilities and services.

2. The CONTRACTOR shall be solely and directly responsible to the owner and operators of such properties for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character brought because of any injuries or damage which may result from the construction operations under this Contract.

3. Neither the CITY nor its officers or agents shall be responsible to the CONTRACTOR for damages because of the CONTRACTOR's failure to protect utilities encountered in the Work.

4. In no event shall interruption of any utility service be allowed outside working hours unless granted by the owner of the utility.

5. No sand, mud, rocks or other construction debris shall be disposed of in the sanitary sewers or storm sewers.

6. Any discharge of construction water to the sewer or storm drain systems requires a City of Roseville discharge permit a minimum of 7 calendar days prior to planned discharge, as approved by ENGINEER.

7. Where bypassing of sewage is required to perform sewer repairs or service relocations and where temporary pumps are required to bypass any sewage across traffic lanes, the discharge lines crossing the traffic lanes shall be buried a minimum of 4 inches below the pavement surface and backfilled with temporary asphalt concrete surfacing. The CONTRACTOR shall take all necessary steps to assure continuous flow of sewage. Bypassing of untreated wastewater to surface waters or courses will not be permitted.

8. The CONTRACTOR shall replace, at its own expense, any and all existing utilities or structures removed or damaged during construction, to their existing condition unless otherwise provided for in these Contract Documents.

01 11 03-7
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

9. The CONTRACTOR shall repair or replace, at its own expense, all pavement damaged during the construction, to its existing condition unless otherwise provided for in these Contract Documents.

D. Names of Known Utilities Serving the Area

1. The following is a list of the known public utilities serving the area:
a. City of Roseville:
1) Water – (916) 774-5750
2) Storm Water – (916) 774-5790
3) Recycled Water – (916) 774-5750
4) Sewer – (916) 774-5750
5) Electric – (916) 797-6937
6) Traffic Signals – (916) 746-1760
b. Pacific Gas and Electric (PG&E):
1) Gas – (530) 320-2908
2) Electric – (530) 320-2908
E. Interfering Structures

1. The CONTRACTOR shall take necessary precautions to prevent damage to existing structures whether on the surfac e, aboveground, or underground. An attempt has been made to show major structures on the Drawin gs. While the information has been compiled from the best available sources, its completeness and accuracy cannot be guaranteed, and it is presented as a guide to avoid possible difficulties.

2. The CONTRACTOR shall protect all existing structures, trees, shrubs, and other items on the project site that are to be preserved, by substantial barricades or other devices commensurate with the hazard, from injury or destruction by vehicles, equipment, workmen, or other agents.

3. Where existing fences, gates, buildings, or any other structure must be removed to properly carry out the work, or are damaged during the work, they shall be restored at the CONTRACTOR's expense to their original condition or better.

4. Without additional compensation, the CONTRACTOR may remove and replace in a condition as good as or better than original, any small structures such as fences, and signposts that interfere with the CONTRACTOR's operations.

F. Field Relocation

1. During the progress of construction, it is expected that minor relocations of the work will be necessary.

2. Such relocations shall be made only by direction of the ENGINEER.

3. If existing structures are encountered that will prevent construction as shown, notify the ENGINEER before continuing with the work in order that the ENGINEER may make such field revisions as necessary to avoid conflict with the existing structures.

4. Any CONTRACTOR request(s) for additional compensation or contract time resulting from necessary field relocations will be considered as set forth in the Agreement.

5. If the CONTRACTOR fails to notify the ENGINEER when a structure which interferes with construction is encountered, and proceeds with the work despite this obstruction, the CONTRACTOR shall do so at their own risk and at no additional cost to the CITY.

G. Traffic Control shall be per City of Roseville Design Standards. All traffic control plans (including signage) shall be per the current CAMUTCD (California Manual on Uniform Traffic Control Devices).

01 11 03-8
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.7 REFERENCE POINTS AND SURVEYS
A. Locations and elevations of benchmarks are shown on Drawings.

B. Dimensions for lines and elevations for grades of structures, appurtenances, and utilities are indicated on Drawings, together with other pertinent information required for laying out Work. If conditions vary from those indicated, notify CITY immediately, who will make or approve minor adjustments, as required.

C. CITY may perform checks to verify accuracy of CONTRACTOR's layout Work and that completed Work complies with Contract Documents.

D. Any existing survey points or other control markers destroyed without proper authorization will be replaced by owner of the survey points or control markers at CONTRACTOR's expense.

E. CONTRACTOR's Responsibilities:

1. Provide all survey and layout required.

2. Locate and protect reference points prior to starting site preparation.

3. Notify CITY at least 3 working days in advance when grade and line surveying will be performed by CONTRACTOR.

4. Check and establish exact location of existing facilities prior to construction of new facilities and any connections thereto.

5. In event of discrepancy in data provided by CITY, request clarification before proceeding with Work.

6. Provide cut sheets for all staking.

7. Preserve and leave undisturbed control staking until ENGINEER has completed checks it deems necessary.

8. Re-establish reference points resulting from destruction by CONTRACTOR's operations.

9. Cooperate with ENGINEER so that checking and measuring may be accomplished with least interference to CONTRACTOR's operations.

1.8 SEQUENCE AND PROGRESS OF WORK
A. The CONTRACTOR shall submit a Construction Schedule covering the entire Work in accordance with Section 01 32 13, Progress Schedule.

B. The CONTRACTOR shall incorporate the requirements of Section 01 14 03 , Special Project Constraints, into the Construction Schedule.

C. Alternate Sequence:

1. The CONTRACTOR’s schedule may use a different sequence from that shown or specified, if techniques and methods known to the CONTRACTOR will result in cost and time savings to the CITY and still achieve the required objectives.

2. The ENGINEER’s determination on the acceptability of any alternative sequence from that shown or specified shall be final.

01 11 03-9
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.9 CONTRACTOR'S USE OF PREMISES
A. The CONTRACTOR shall coordinate use of the premises, for the CONTRACTOR’s storage and the operations of the CONTRACTOR’s workmen, with CITY and utility service companies.

1. 1800 Booth Road is available to the Contractor for material storage or project office.

The City can supply sewer and water connections but the Contractor will have to make arrangements for power.

B. Restriction of Work Area:

1. The full use of the premises for storage, the operations of workmen and for all other construction activities will not be available to the CONTRACTOR.

2. The CONTRACTOR must operate entirely within the space allowed to the CONTRACTOR.

3. The Drawings defines the area allocated to the CONTRACTOR.

C. The CONTRACTOR shall be solely responsible for obtaining and paying all costs in connection with any additional work area, storage sites, access to the site or temporary right-of-way, which may be required for proper completion of the Work.

D. Limitations on Use of Work Area:

1. It shall be understood that responsibility for protection and safe -keeping of equipment and materials on or near the site will be entirely that of the CONTRACTOR and that no claim shall be made against the CITY or their authorized representatives by reason of any act.

2. It shall be further understood that should any occasion arise necessitating access to the sites occupied by these stored materials or equipment, the ENGINEER shall direct the CONTRACTOR owning or responsible for the stored materials and equipment to immediately move the same.

3. No materials or equipment may be placed upon the property of the CITY, other than in the designated areas as shown on the Drawings, unless the ENGINEER has agreed to the location contemplated by the CONTRACTOR to be used for storage.

4. All stored materials shall be labeled according to the appropriate contractor or Subcontractor with the manufacturer's label as well.

5. Appropriate material safety data sheets (e.g., MSDS) shall be provided.

E. The CONTRACTOR shall be required to share use of the premises with other Contractors whose services the CITY has obtained or will obtain for construction of other facilities on the site.

1.10 USE OF OWNER’S FACILITIES
A. The CONTRACTOR may use existing facilities or equipment in the Work for construction purposes, only if the CITY’s written permission is obtained.

B. Restore existing facilities and equipment used for temporary purposes to original condition in a manner satisfactory to CITY.

C. The full use of the premises for storage, the operations of workmen, and for all other construction activities, will not be available for the CONTRACTOR.

D. The CONTRACTOR must operate entirely within the space allowed to the CONTRACTOR.

01 11 03-10
Summary of Work
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

E. The Drawings define the Work Zone area allocated to the CONTRACTOR.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
++ END OF SECTION ++

01 14 03-1
Special Project Constraints
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 14 03

SPECIAL PROJECT CONSTRAINTS
PART 1 - GENERAL

1.1 LIMIT OF CONSTRUCTION ACTIVITIES ON WORK SITE
A. Work Months:

1. Schedule B construction activities may only occur between April 15th and October 15th to avoid the rainy season. Work that cannot completed prior to October 15thdue to supply issues outside of the Contractor’s control must be negotiated with the City.

B. Traffic Control:

1. During non-work hours, the CONTRACTOR shall keep all lanes of traffic open and clear. All trenches shall be backfilled or covered with suitable steel plates and open to traffic. Steel plates shall sit flush with the existing pavement and shall be pinned and staked. Plates cannot be installed on top of AC.

2. No equipment, construction material or excavated material that will interfere with traffic shall be stored on streets or roadways at any time.

C. Bypass Pumping

1. See Section 01 57 03

1.2 SEQUENCE OF WORK
A. General:

1. The CONTRACTOR shall schedule and sequence their work to complete the Work by the specified completion date.

2. The CITY’s wastewater collection system must remain operational at all times, with scheduled shutdowns as necessary to complete the Work and with prior approval of CITY, as described herein.

3. Re-vegetation of graded areas shall take place as quickly as possible as weather permits.

1.3 PROJECT CONSTRAINTS
A. Maintenance of CITY’s Operations:

1. Constraints listed herein involve limits on activities during construction. These limits relate to the critical nature of the existing sewer system.

2. Continuous operation of CITY’s facilities is of critical importance. Schedule and conduct activities to enable existing facilities to operate continuously, unless otherwise specified.

3. Work Plan:
a. The CONTRACTOR shall submit a detailed Work Plan and time schedule for all construction activities that will make it necessary to remove a pipeline, electrical circuit, equipment, structure, road or other facilities from service, including the critical outages identified herein.
b. The Work Plan shall, at a minimum, identify:
1) the date and time when each activity will occur;
2) what equipment will be present including standby equipment;

01 14 03-2
Special Project Constraints
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3) what assistance will be required by CITY’s operating personnel; 4) an emergency backup plan identifying wh at action will be taken if Work cannot be completed within the allotted time; and
5) what individual will be in charge of the activity.
c. Submit Work Plan 10 working days prior to the scheduled activity.

4. Perform Work continuously during critical connections and changeovers, and as required to prevent interruption of CITY’s operations.

5. Shutdowns:
a. Coordinate proposed Work with CITY and facility operations personnel before affecting unit shutdowns. The CONTRACTOR shall provide written confirmation of the shutdown date and time five (5) working days prior to the actual shutdown. b. Under no circumstances shall the CONTRACTOR cease Work at the end of a normal working day or at the end of a working week if such actions may inadvertently cause a cessation of any facility operating process, in which case, remain onsite until necessary repairs are complete.

6. Do not close lines, open valves or gates, shut down equipment, or take other action which would affect the operation of existing systems, except as specifically required by the Contract Documents and after approval of CITY.

7. Do not proceed with Work affecting a facility's operation without obtaining CITY's advance approval of the need for and duration of such Work.

B. Relocation of Existing Facilities:

1. During construction, it is expected that minor relocations of Work will be necessary.

2. Provide complete relocation of existing structures and Underground Facilities, including piping, utilities, equipment, structures, electrical conduit wiring, electrical duct bank, and other necessary items.

3. Use only new materials for relocated facility. Match materials of existing facility, unless otherwise shown or specified.

4. Perform relocations to minimize downtime of existing facilities.

5. Install new portions of existing facilities in their relocated position prior to removal of existing facilities, unless otherwise accepted by CITY.

C. Hours of Work and Overtime:

1. Normal working hours at the Construction Site for the project shall be 7A.M. to 5P.M., weekdays, no work during the weekend nor during CITY observed holidays. a. Conduct Work outside normal working hours only after obtaining prior written consent and approval from the CITY.
1) Contractor shall request work -hour variations in writing, a minimum of ten (10) days prior to the start of the proposed work period. 2) Contractor shall not rely on approval of work outside of normal working hours without prior consent of the CITY. Approval shall be at the sole discretion of the CITY.
b. Contractor will develop Project Schedule assuming work during normal working hours only.

2. All overtime Work by the CONTRACTOR necessary to conform to the requirements of this Section and related Sections shall be performed by the CONTRACTOR, at no cost to the CITY and shall be performed in accordance with the Agreement. The CONTRACTOR shall make no claims for extra compensation as a result thereof.

01 14 03-3
Special Project Constraints
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.4 CONSTRUCTION SEQUENCING CONSTRAINTS
A. No specific construction sequencing constraints other than those listed in this or other Specification sections have been determined at the time of Final Design.

B. Construction sequencing constraints will be developed by Design -Assist Team as necessary.

C. This section includes requirements for sequencing and scheduling the Work. Utilize the description of the critical events in the work sequence as a guideline for scheduling and undertaking the Work. Where milestones are specified, CONTRACTOR shall schedule and undertake the Work in accordance with the specified requirements.

D. Schedule B Milestones:

1. Schedule B work on Sierra College Blvd. shall be completed before Schedule A.

2. Work for Schedule B will occur between April 15 and October 15.

E. Schedule A Milestones:

1. Hickory Street:
a. Schedule A work to start with open cut work on Hickory Street. b. Work on Hickory Street shall start with the new SSMH at Porter Drive and move eastward to minimize disruption of sewer flows.

2. Atkinson Street:
a. Traffic to be limited to residential traffic only during construction.

3. Church Street:
a. Traffic Control Plan shall include flagging outside of commute hours. b. Two-way traffic will be allowed on Church Street outside of working hours. c. Denio’s Market will be open Friday through Sunday and Contractor shall make every effort to maintain foot and car access while minimizing impact to parking. d. No work affecting Atkinson Friday through Sunday
e. All sidewalks leading to Denio’s Market shall remain open Friday to Sunday.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 14 03-4
Special Project Constraints
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 29 03-1
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 29 03

MEASUREMENT AND PAYMENT
PART 1 - MEASUREMENT

1.1 SCHEDULE A BID DESCRIPTIONS

Bid Schedule Item No. 1 – Mobilization and Demobilization The LUMP SUM price paid shall include full compensation for bonds, insurance, required permits and fees, shop drawings, project phasing, supervision, coordination of concurrent work with other contractors, meetings, pre-construction documentation of project area (photos and HD video), “as-built” plans or record drawings, clean-up of the work area including removal of USA markings at project completion, movement of personnel, equipment, supplies, and incidentals to and from the project site, surveying, and resetting survey monuments; for the establishment of all other facilities necessary for work on the project, including temporary sanitation facilities for the workers; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work on the project site; for work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work. Payment for mobilization at 10% of the lump sum bid price shall be made at the time of the first progress payment after the Contractor has purchased bonds and insurance. Fifty percent shall be paid when the Contractor has mobilized to the project site and initiated work. The remainder of 40% shall be paid at the time of last progress payment after all cleanup and demobilization is completed.

Bid Schedule Item No. 2 – Worker Protection and Trench Safety/Shoring This item includes all labor, materials, equipment, and supplies required for providing a detailed plan of worker safety and maintaining safety during construction, including conforming to Labor Code Sections 6700-6708, all applicable safety orders and permits.

The Contractor shall be responsible for the design, construction, and effects of sloping and shoring systems for the project. The Contractor shall submit to the Owner’s Representative a detailed plan stamped and signed by a Professional Civil Engineer, licensed in the State of California, showing the design of shoring, bracing, sloping, or other provisions for worker protection as required by General Provisions 5-1.07 Safety Requirements. The shoring bracing, shielding, and sheeting plan shall contain alternative (i.e., contingent) systems should the initial systems not achieve the following minimum performance requirements.

1. Protect personnel that enter the excavation.

2. Protect existing utilities, pavements, and structures.

3. Excavation of slopes and/or installa tion of the shoring system must be done in a manner that does not damage existing structures, pavements, and utilities including through settlement, heave, or vibrations.

4. Prevent caving of lateral movement of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement, even when subjected to construction vibrations.

5. Provide stable excavation walls, slopes, and bottom.

6. Allow for removal of shoring and excavation backfilling in a manner that does not damage the finished pipeline or existing structures, pavements, and utilities including

01 29 03-2
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

through settlement, heave, or vibrations. Any void space created by shoring removal should be completely filled with controlled density fill.

7. Resist lateral loads from vehicular traffic, construction equipment and spoils, and hydrostatic pressures, if any.

Site specific shoring desig n submittal shall be required when excavations fall within an imaginary plan e projected downward at an inclination of 1H:1V from the nearest edge of adjacent structures and utilities.

The Contractor shall monitor and evaluate subsurface soil conditions encountered in project excavations. Contractors and their excavation designers shall acknowledge Cal/OSHA requirements to develop their own assessment of safe slopes for the project. The responsibility for soil type classification and determination of safe temporary slope inclinations is a field decision to be made at the time of excavation by the Contractor’s “competent person”.

In the interest of public safety and convenience, the entire open trench and all excavations shall be plated and equipment relocated as directed to minimize public impact at the end of each working day. The completed sections of trench shall be backfilled and compacted, and when in streets, opened to traffic as soon as possible.

Schedule A Item No. 3 – Bypass Pumping
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to provide bypass pumping on Hickory, Atkinson and Church Streets during construction.

Schedule A Item No. 4 – Traffic Control
The LUMP SUM price shall include all necessary equipment, materials, labor, and miscellaneous items. Flagger must be dedicated solely to traffic control purposes and shall not be pulled to perform other work while an active flagger is required. Traffic control is to be in accordance with California Traffic Manual minimum recommended channelizer and sign spacing. This work shall include routing of pedestrian, vehicular, and construction traffic; furnishing labor, tools, equipment, materials and incidentals for implementing and providing the traffic control devices, phasing, signage, striping, and personnel in accordance with the Contract Documents.

Full compensation for Traffic Control, including all services, permits (Caltrans), material costs, delivery, installation, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City shall be considered as included in the lump sum price paid for Bid Item 4, Traffic Control, complete and in-place, and no additional compensation will be allowed therefor.

Schedule A Item No. 5 – Open-Cut Pipe Installation on Hickory Street The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 15” VCP between (NEW) SSMH No. 1 and SSMH C04-203 in Hickory Street: open cut installation shall include the cost of, but is not limited to:
• Identifying the locations of existing subsurface utilities and connection points; • All pavement, curb, gutter and sidewalk saw-cutting, removal and replacement; • Trench excavation, backfill, compaction and safety;
• Imported bedding material;
• Sub-grade preparation and all compaction;

01 29 03-3
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

• Furnishing and installing VCP sewer pipe as indicated on the Drawings, including fittings and appurtenances;
• Furnishing and installation of new manhole (SSMH-01) as detailed in Drawing C-02 and SD-01;
• Disposal of excess excavated material;
• Removal and replacement where necessary of interfering portions of existing sewer pipes and improvements;
• Placing, joining, and retaining pipe, bends, adapters, couplings, vertical and horizontal offsets, restrained or harnessed joints, end caps, and other fittings not included in other bid items;
• Erosion and sediment control;
• Restoration of damaged and disturbed street improvements; and • Temporary resurfacing, permanent asphalt concrete and concrete resurfacing as needed; and
• Concrete cross gutter repair.
• All other labor, equipment and material incidental to the installation of the pipe, complete in place.

Full compensation for installing VCP Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bells at existing structures. Work to make connections to the City -installed bells shall be included in this bid item.

Schedule A Item No. 6 – Pipe Installation on Atkinson Street The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 14” HDPE pipe between and connect to SSMH C04-136 and SSMH C04-203 in Atkinson Street: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

Schedule A Item No. 7 – Furnish and Install New Manhole (SSMH-02) on Atkinson Street
The UNIT PRICE is for this work includes furnishing and installation of new manhole as detailed in Drawing C-04 and SD-01. Included in the cost is the abandonment of the 10” SS between SSMH C04-203 and (NEW) SSMH-02, pavement cutting removal, excavating, furnishing and installing the new manhole on an existing sewer.

Schedule A Item No. 8 –Pipe Installation on Church Street The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 18” and 14” HDPE pipe between and connect to SSMH B04-006 and SSMH C04-180 in Church Street: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

01 29 03-4
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

1.2 SCHEDULE B BID DESCRIPTIONS

Schedule B Item No. 1 – Mobilization and Demobilization The LUMP SUM price paid shall include full compensation for bonds, insurance, required permits and fees, shop drawings, project phasing, supervision, coordination of concurrent work with other contractors, meetings, pre-construction documentation of project area (photos and HD video), “as-built” plans or record drawings, clean-up of the work area including removal of USA markings at project completion, movement of personnel, equipment, supplies, and incidentals to and from the project site, surveying, and resetting survey monuments; for the establishment of all other facilities necessary for work on the project, including temporary sanitation facilities for the workers; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work on the project site; for work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work. Payment for mobilization at 10% of the lump sum bid price shall be made at the time of the first progress payment after the Contractor has purchased bonds and insurance. Fifty percent shall be paid when the Contractor has mobilized to the project site and initiated work. The remainder of 40% shall be paid at the time of last progress payment after all cleanup and demobilization is completed.

Schedule B Item No. 2 – Worker Protection and Trench Safety/Shoring This LUMP SUM item includes all labor, materials, equipment, and supplies required for providing a detailed plan of worker safety and maintaining safety during construction, including conforming to Labor Code Sections 6700-6708, all applicable safety orders and permits.

The Contractor shall be responsible for the design, construction, and effects of sloping and shoring systems for the project. The Contractor shall submit to the Owner’s Representative a detailed plan stamped and signed by a Professional Civil Engineer, licensed in the State of California, showing the design of shoring, bracing, sloping, or other provisions for worker protection as required by General Provisions 5-1.07 Safety Requirements. The shoring bracing, shielding, and sheeting plan shall contain alternative (i.e., contingent) systems should the initial systems not achieve the following minimum performance requirements.

1. Protect personnel that enter the excavation.

2. Protect existing utilities, pavements, and structures.

3. Excavation of slopes and/or installation of the shoring system must be done in a manner that does not damage existing structures, pavements, and utilities including through settlement, heave, or vibrations.

4. Prevent caving of lateral movement of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement, even when subjected to construction vibrations.

5. Provide stable excavation walls, slopes, and bottom.

01 29 03-5
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

6. Allow for removal of shoring and excavation backfilling in a manner that does not damage the finished pipeline or existing structures, pavements, and utilities including through settlement, heave, or vibrations. Any void space created by shoring removal should be completely filled with controlled density fill.

7. Resist lateral loads from vehicular traffic, construction equipment and spoils, and hydrostatic pressures, if any.

Site specific shoring design submittal shall be required when excavations fall within an imaginary plane projected downward at an inclination of 1H:1V from the nearest edge of adjacent structures and utilities.

The Contractor shall monitor and evaluate subsurface soil conditions encountered in project excavations. Contractors and their excavation designers shall acknowledge Cal/OSHA requirements to develop their own assessment of safe slopes for the project. The responsibility for soil type classification and determination of safe temporary slope inclinations is a field decision to be made at the time of excavation by the Contractor’s “competent person”.

In the interest of public safety and convenience, the entire open trench and all excavations shall be plated and equipment relocated as directed to minimize public impact at the end of each working day. The completed sections of trench shall be backfilled and compacted, and when in streets, opened to traffic as soon as possible.

Schedule B Item No. 3 – Bypass Pumping
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to provide bypass pumping on Sierra College Boulevard during construction.

Schedule B Item No. 4 – Traffic Control
The LUMP SUM price shall include all necessary equipment, materials, labor, and miscellaneous items. Flagger must be dedicated solely to traffic control purposes and shall not be pulled to perform other work while an active flagger is required. Traffic control is to be in accordance with California Traffic Manual minimum recommended channelizer and sign spacing. This work shall include routing of pedestrian, vehicular, and construction traffic; furnishing labor, tools, equipment, materials and incidentals for implementing and providing the traffic control devices, phasing, signage, striping, and personnel in accordance with the Contract Documents.

Full compensation for Traffic Control, including all services, permits (Caltrans), material costs, delivery, installation, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City shall be considered as included in the lump sum price paid for Bid Item 5, Traffic Control, complete and in-place, and no additional compensation will be allowed therefor.

Schedule B Item No. 5 – Pipe Installation Upstream of PS26 (Work Zone 1) The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” SS between MH No. 2 and MH No. 1 in Work Zone 1: pipe bursting during construction, including excavation, and inspections during pipe bursting process. Open cut installation shall include the cost of, but is not limited to:
• Identifying the locations of existing subsurface utilities and connection points; • All pavement, curb, gutter and sidewalk saw-cutting, removal and replacement; • Trench excavation, backfill, compaction and safety;

01 29 03-6
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

• Imported bedding material;
• Sub-grade preparation and all compaction;
• Furnishing and installing VCP sewer pipe as indicated on the Drawings, including fittings and appurtenances;
• Disposal of excess excavated material;
• Removal and replacement where necessary of interfering portions of existing sewer pipes and improvements;
• Placing, joining, and retaining pipe, bends, adapters, couplings, vertical and horizontal offsets, restrained or harnessed joints, end caps, and other fittings not included in other bid items;
• Erosion and sediment control;
• Restoration of damaged and disturbed street improvements; and • Temporary resurfacing, permanent asphalt concrete and concrete resurfacing as needed; and
• Concrete cross gutter repair.
• All other labor, equipment and material incidental to the installation of the pipe, complete in place.

Full compensation for installing VCP and HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bells at existing structures. Work to make connections to the City -installed bells shall be included in this bid item.

Schedule B Item No. 6 – Furnish and Install New Weir Manhole (Work Zone 1) The UNIT PRICE is for this work includes furnishing and installation of new hybrid PVC weir manhole as detailed in Drawing C-15. Included in the cost is pavement cutting removal, excavating, furnishing and installing the new weir manhole with slide gate and weir blocks.

Schedule B Item No. 7 – Pipe Installation Between MH A08-010 to MH B08-196 (Work Zone 2)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 10” HDPE pipe between and connect to MH A08-010 and MH B08-196 in Work Zone 2: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

Schedule B Item No. 8 – Pipe Installation Between MH B08-196 to B08-113 (Work Zone 3)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” SS between MH B08-196 and B08-113 in Work Zone 3: pipe bursting during construction, including excavation, and inspections during pipe bursting process. Open cut installation shall include the costs described in Schedule B Item No. 5.

01 29 03-7
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Full compensation for installing VCP and/or HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bells at existing structures where open cut is utilized. Work to make connections to the City-installed bells shall be included in this bid item.

Schedule B Item No. 9 – Pipe Installation Between MH B08-113 to MH B08-077 (Work Zone 4)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” HDPE pipe between and connect to MH B08-113 and MH B08-077 in Work Zone 4: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

Schedule B Item No. 10 – Pipe Installation Between MH B08-077 to MH B08-062 (Work Zone 5)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” HDPE pipe between and connect to MH B08-077 and MH B08-062 in Work Zone 5: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

PART 2 - GENERAL

2.1 GENERAL
A. Payment will be made at the price bid for each item listed on the bidding form or as extra work as provided in the General Conditions.

B. No initial progress payment (other than a single mobilization payment as described in Article 1. 3 below) will be made prior to acceptance by the ENGINEER of the CPM Construction Schedule, the associated Schedule of Costs, and the list of anticipated submittals.

C. No subsequent progress payment will be made prior to receipt by the ENGINEER of the monthly update of the Construction Progress Schedule, as specified in Sections 01 31 19, Project Meetings and 01 32 16, Progress Schedule.

01 29 03-8
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

D. No subsequent progress payment will be made prior to receipt by the ENGINEER of Certified Payroll for the previous month.

2.2 SCHEDULE OF COSTS FOR PAYMENTS
A. Submit to the ENGINEER, within 5 days of acceptance of the Construction Schedule, five (5) copies of a Schedule of Costs. The Schedule of Costs shall be a form showing a detailed breakdown of quantities and prices of work and materials required to perform and complete the contract.

B. The Schedule of Costs shall provide a cost breakdown for each element detailed in the approved Construction Schedule. The total of the price breakdown must agree with the lump-sum price bid. The elements listed and price breakdown shall not be front end loaded or unbalanced, shall be subject to adjustment between the ENGINEER and the CONTRACTOR, and will be used as a basis for progress payments.

C. The Schedule of Costs will be used as a basis for determining the amount of the monthly progress payments.

D. Acceptance of the Schedule of Costs by the ENGINEER shall not relieve the CONTRACTOR of the responsibility of performing all the work needed to complete the project at the lump-sum price bid.

2.3 PAYMENT FOR MOBILIZATION
A. Mobilization Cost Breakdown:

1. As soon as practicable after receipt of the Notice to Proceed, the CONTRACTOR shall submit a breakdown to the ENGINEER for approval, which shall show the estimated value of each major component of mobilization.

2. When approved by the ENGINEER, the breakdown will be the basis for initial progress payments in which mobilization is included.

3. Said breakdown shall not be "front end loaded" or unbalanced.

B. One CONTRACTOR payment may be made prior to acceptance of the Construction Schedule, Schedule of Costs, and list of anticipated submittals.

1. Payment shall be limited to mobilization items only.

2. The Construction Schedule is described in Section 01 32 13, Simplified Project Schedule

3. Mobilization items are described in Section 01 71 13, Mobilization.

4. The Schedule of Costs is described in Paragraph 1.2 of this Section.

5. The list of anticipated submittals is described in Section 01 33 03, Submittal Procedures.

2.4 PROGRESS PAYMENTS
A. Progress Payment Request Submittal:

1. Unless otherwise mutually agreed, by the 25th of each month, the CONTRACTOR shall prepare and submit monthly progress payment requests for work completed through the 25th day of the month.

2. Said payment request shall be based on the breakdown of activities as specified in the Schedule of Costs described in Paragraph 1.2 above.

01 29 03-9
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3. The monthly schedule update shall be submitted as part of the monthly progress payment report.

B. The ENGINEER will review progress payment requests and make a determination of the percent completion of all activities (rounded to the nearest whole percent) based on an approximate measurement of all materials supplied and work performed.

C. In the event that the CONTRACTOR fails to provide the OWNER with an acceptable Monthly Contract Record Drawing Submittal in accordance with Section 01 33 03, Submittal Procedures the OWNER shall deduct compensation for such monthly submittal as provided in Section 01 32 13, Simplified Project Schedule . Said deduction shall become the sole property of the OWNER.

D. Retention:

1. From the amount thus determined, five percent thereof will be deducted as retention by OWNER for performance security.

2. Acceptance of separate components shall not operate to release performance retention.

3. The amount of all payments previously made to the CONTRACTOR and any amounts due the OWNER from the CONTRACTOR for supplies, materials, services, damages, or otherwise deductible under the terms of the contract will be deducted from the remainder.

4. The remaining amount will be paid as a progress payment by the OWNER to the CONTRACTOR on the third Friday of the succeeding month or as soon thereafter as is practical.

E. In addition to the retention under Paragraph D above, the whole or part of any payment of the estimated amount due the CONTRACTOR may be withheld as an additional retention if such course be deemed necessary to protect the OWNER from loss due to the CONTRACTOR’s failure to perform any of the following: (1) meet CONTRACTOR’s payment obligations; (2) execute the work; (3) correct defective work; (4) settle damages as provided; or (5) produce substantial evidence that no stop notices will or have been filed, and/or if it has been determined that unpaid balances may be insufficient to complete the work.

F. All material and work covered by progress payments thereupon become the sole property of the OWNER, but this provision shall not be construed as relieving the CONTRACTOR from sole responsibility for all materials and work upon which payments have been made or the restoration of any damaged work or as a waiver of the OWNER’s right to require fulfillment of all of the contract terms. Said CONTRACTOR’s obligation extends through the close of the warranty period.

G. Payment for Materials:

1. No payment shall be made for materials stored offsite.

2. Payment may be made for those materials delivered to the site but not incorporated in the work to the extent that the materials are included in the Construction Schedule as cost-loaded material delivery activities.

3. Only material items manufactured specifically for this project and that cost individually in excess of $20,000 will be considered for partial payment as stored materials.

01 29 03-10
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

4. Partial payment for materials delivered will not be made before the respective shop drawings, installation instructions and O&M manuals have been submitted, reviewed, and accepted in accordance with Section 01 33 03, Submittal Procedures.

5. To receive partial payment for materials delivered to the site, but not incorporated in the work, it shall be necessary for the CONTRACTOR to submit to the ENGINEER, at least 7 days prior to the end of said month, a list of such materials.

6. At their sole discretion, the ENGINEER will approve items for which partial payment is to be made.

7. The list of materials and invoices shall be clearly identified by referencing the associated activity or item on the price breakdown.

8. Partial payment for materials delivered to the site or a bonded warehouse will be made in an amount equal to 75% of the respective suppliers ’ invoices(s) for the actual net cost for the item(s) delivered plus delivery charges.

9. The CONTRACTOR's actual net cost for the materials must be supported by invoices of suppliers.

10. Proper storage and protection of materials shall be provided by the CONTRACTOR.

Final payment shall be made only for materials actually incorporated in the work and, upon acceptance of the work, all materials remaining for which advance payments had been made shall revert to the CONTRACTOR, unless otherwise agreed, and partial payments made for these items shall be deducted from the final payment for the work.

2.5 FINAL PAYMENT AND RELEASE OF CLAIMS

1. Upon the completion of the work as determined by the ENGINEER, a Notice of Acceptance will be issued and recorded with the County.

2. The OWNER will pay to the CONTRACTOR within 35 days after filing of the Notice of Acceptance, or as soon thereafter as practicable, the remaining amount due the CONTRACTOR including retainage, less all prior payments and advances whatsoever to or for the account of the CONTRACTOR for supplies, materials, services, damages, stop notices, or otherwise deductible under the terms of the contract.

3. All prior estimates and payments including those relating to extra work shall be subject to correction by this payment, which throughout this contract is called "Final Payment".

2.6 RELEASE OF CLAIMS:

A. Neither the final payment nor any part of the retained percentage shall become due until the CONTRACTOR shall have delivered to the OWNER a complete release of all claims against the OWNER arising under and by virtue of this contract and related to undisputed amounts, including claims of Subcontractors and suppliers of either materials or labor.

B. If disputed contract claims in stated amounts are unresolved 35 days after issuance of the Notice of Acceptance, a progress payment of undisputed amounts and retained funds will be made by OWNER upon receipt of a release specifically excluding the disputed contract claims.

C. Claims by the OWNER against the CONTRACTOR for liquidated damages or actual damages or other causes will be a valid basis for withholding of funds by the OWNER.

D. Upon resolution of disputed claims the CONTRACTOR shall execute a supplemental release and, upon delivery the OWNER will make final payment.

01 29 03-11
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

PART 3 - PRODUCTS (NOT USED)
PART 4 - EXECUTION (NOT USED)

++ END OF SECTION ++

01 29 03-12
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 29 03-1
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 29 03

MEASUREMENT AND PAYMENT
PART 1 - MEASUREMENT

1.1 BASE BID SCHEDULE DESCRIPTIONS

Bid Schedule Item No. 1 – Mobilization and Demobilization The LUMP SUM price paid shall include full compensation for bonds, insurance, required permits and fees, shop drawings, project phasing, supervision, coordination of concurrent work with other contractors, meetings, pre-construction documentation of project area (photos and HD video), “as-built” plans or record drawings, clean-up of the work area including removal of USA markings at project completion, movement of personnel, equipment, supplies, and incidentals to and from the project site, surveying, and resetting survey monuments; for the establishment of all other facilities necessary for work on the project, including temporary sanitation facilities for the workers; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work on the project site; for work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work. Payment for mobilization at 10% of the lump sum bid price shall be made at the time of the first progress payment after the Contractor has purchased bonds and insurance. Fifty percent shall be paid when the Contractor has mobilized to the project site and initiated work. The remainder of 40% shall be paid at the time of last progress payment after all cleanup and demobilization is completed.

Bid Schedule Item No. 2 – Worker Protection and Trench Safety/Shoring This item includes all labor, materials, equipment, and supplies required for providing a detailed plan of worker safety and maintaining safety during construction, including conforming to Labor Code Sections 6700-6708, all applicable safety orders and permits.

The Contractor shall be responsible for the design, construction, and effects of sloping and shoring systems for the project. The Contractor shall submit to the Owner’s Representative a detailed plan stamped and signed by a Professional Civil Engineer, licensed in the State of California, showing the design of shoring, bracing, sloping, or other provisions for worker protection as required by General Provisions 5-1.07 Safety Requirements. The shoring bracing, shielding, and sheeting plan shall contain alternative (i.e., contingent) systems should the initial systems not achieve the following minimum performance requirements.

1. Protect personnel that enter the excavation.

2. Protect existing utilities, pavements, and structures.

3. Excavation of slopes and/or installa tion of the shoring system must be done in a manner that does not damage existing structures, pavements, and utilities including through settlement, heave, or vibrations.

4. Prevent caving of lateral movement of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement, even when subjected to construction vibrations.

5. Provide stable excavation walls, slopes, and bottom.

6. Allow for removal of shoring and excavation backfilling in a manner that does not damage the finished pipeline or existing structures, pavements, and utilities including

01 29 03-2
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

through settlement, heave, or vibrations. Any void space created by shoring removal should be completely filled with controlled density fill.

7. Resist lateral loads from vehicular traffic, construction equipment and spoils, and hydrostatic pressures, if any.

Site specific shoring desig n submittal shall be required when excavations fall within an imaginary plan e projected downward at an inclination of 1H:1V from the nearest edge of adjacent structures and utilities.

The Contractor shall monitor and evaluate subsurface soil conditions encountered in project excavations. Contractors and their excavation designers shall acknowledge Cal/OSHA requirements to develop their own assessment of safe slopes for the project. The responsibility for soil type classification and determination of safe temporary slope inclinations is a field decision to be made at the time of excavation by the Contractor’s “competent person”.

In the interest of public safety and convenience, the entire open trench and all excavations shall be plated and equipment relocated as directed to minimize public impact at the end of each working day. The completed sections of trench shall be backfilled and compacted, and when in streets, opened to traffic as soon as possible.

Bid Schedule Item No. 3 – PS26 Improvements
The LUMP SUM price shall include all necessary equipment, materials, labor, and miscellaneous items to complete the following work:
• Demolish existing electrical control panel pad and switch board; • Install and connect new Control Panel and pad, Emergency Generator and pad, Electrical Instrumentation and Controls;
• Demolish existing fencing;
• Install new fencing and connect to existing fencing;
• PS26 bypass pumping;
• Remove and salvage existing PS26 submersible pumps, chains, guide rails, discharge elbows and DIP;
• Install new City-furnished submersible pumps and accessories, stainless steel and DIP piping in wet well;
Replace 12” DIP between MH No. 1 and PS26 Wet Well with 12” VCP via open cut installation. Open cut installation shall include the cost of, but is not limited to:
• Identifying the locations of existing subsurface utilities and connection points; • All pavement, curb, gutter and sidewalk saw-cutting, removal and replacement; • Trench excavation, backfill, compaction and safety;
• Imported bedding material;
• Sub-grade preparation and all compaction;
• Furnishing and installing VCP sewer pipe as indicated on the Drawings, including fittings and appurtenances;
• Disposal of excess excavated material;
• Removal and replacement where necessary of interfering portions of existing sewer pipes and improvements;
• Placing, joining, and retaining pipe, bends, adapters, couplings, vertical and horizontal offsets, restrained or harnessed joints, end caps, and other fittings not included in other bid items;
• Erosion and sediment control;
• Restoration of damaged and disturbed street improvements; and

01 29 03-3
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

• Temporary resurfacing, permanent asphalt concrete and concrete resurfacing as needed; and
• Concrete cross gutter repair.
• All other labor, equipment and material incidental to the installation of the pipe, complete in place.

Full compensation for installing VCP including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bell at existing PS26. Work to make connections to the City-installed bell shall be included in this bid item.

1.2 ADDITIVE BID SCHEDULE DESCRIPTIONS

Additive Bid Schedule Item No. 1A – Mobilization and Demobilization The LUMP SUM price paid shall include full compensation for bonds, insurance, required permits and fees, shop drawings, project phasing, supervision, coordination of concurrent work with other contractors, meetings, pre-construction documentation of project area (photos and HD video), “as-built” plans or record drawings, clean-up of the work area including removal of USA markings at project completion, movement of personnel, equipment, supplies, and incidentals to and from the project site, surveying, and resetting survey monuments; for the establishment of all other facilities necessary for work on the project, including temporary sanitation facilities for the workers; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work on the project site; for work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work. Payment for mobilization at 10% of the lump sum bid price shall be made at the time of the first progress payment after the Contractor has purchased bonds and insurance. Fifty percent shall be paid when the Contractor has mobilized to the project site and initiated work. The remainder of 40% shall be paid at the time of last progress payment after all cleanup and demobilization is completed.

Additive Bid Schedule Item No. 2A – Worker Protection and Trench Safety/Shoring This LUMP SUM item includes all labor, materials, equipment, and supplies required for providing a detailed plan of worker safety and maintaining safety during construction, including conforming to Labor Code Sections 6700-6708, all applicable safety orders and permits.

The Contractor shall be responsible for the design, construction, and effects of sloping and shoring systems for the project. The Contractor shall submit to the Owner’s Representative a detailed plan stamped and signed by a Professional Civil Engineer, licensed in the State of California, showing the design of shoring, bracing, sloping, or other provisions for worker protection as required by General Provisions 5-1.07 Safety Requirements. The shoring bracing, shielding, and sheeting plan shall contain alternative (i.e., contingent) systems should the initial systems not achieve the following minimum performance requirements.

1. Protect personnel that enter the excavation.

2. Protect existing utilities, pavements, and structures.

01 29 03-4
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3. Excavation of slopes and/or installation of the shoring system must be done in a manner that does not damage existing structures, pavements, and utilities including through settlement, heave, or vibrations.

4. Prevent caving of lateral movement of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement, even when subjected to construction vibrations.

5. Provide stable excavation walls, slopes, and bottom.

6. Allow for removal of shoring and excavation backfilling in a manner that does not damage the finished pipeline or existing structures, pavements, and utilities including through settlement, heave, or vibrations. Any void space created by shoring removal should be completely filled with controlled density fill.

7. Resist lateral loads from vehicular traffic, construction equipment and spoils, and hydrostatic pressures, if any.

Site specific shoring design submittal shall be required when excavations fall within an imaginary plane projected downward at an inclination of 1H:1V from the nearest edge of adjacent structures and utilities.

The Contractor shall monitor and evaluate subsurface soil conditions encountered in project excavations. Contractors and their excavation designers shall acknowledge Cal/OSHA requirements to develop their own assessment of safe slopes for the project. The responsibility for soil type classification and determination of safe temporary slope inclinations is a field decision to be made at the time of excavation by the Contractor’s “competent person”.

In the interest of public safety and convenience, the entire open trench and all excavations shall be plated and equipment relocated as directed to minimize public impact at the end of each working day. The completed sections of trench shall be backfilled and compacted, and when in streets, opened to traffic as soon as possible.

Additive Bid Schedule Item No. 3A – Bypass Pumping
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to provide bypass pumping on Sierra College Boulevard during construction.

Additive Bid Schedule Item No. 4A – Traffic Control
The LUMP SUM price shall include all necessary equipment, materials, labor, and miscellaneous items. Flagger must be dedicated solely to traffic control purposes and shall not be pulled to perform other work while an active flagger is required. Traffic control is to be in accordance with California Traffic Manual minimum recommended channelizer and sign spacing. This work shall include routing of pedestrian, vehicular, and construction traffic; furnishing labor, tools, equipment, materials and incidentals for implementing and providing the traffic control devices, phasing, signage, striping, and personnel in accordance with the Contract Documents.

Full compensation for Traffic Control, including all services, permits (Caltrans), material costs, delivery, installation, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City shall be considered as included in the lump sum price paid for Bid Item 5, Traffic Control, complete and in-place, and no additional compensation will be allowed therefor.

01 29 03-5
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Additive Bid Schedule Item No. 5A – Pipe Installation Upstream of PS26 (Work Zone 1)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” SS between MH No. 2 and MH No. 1 in Work Zone 1: pipe bursting during construction, including excavation, , and inspections during pipe bursting process. Open cut installation shall include the cost of, but is not limited to:
• Identifying the locations of existing subsurface utilities and connection points; • All pavement, curb, gutter and sidewalk saw-cutting, removal and replacement; • Trench excavation, backfill, compaction and safety;
• Imported bedding material;
• Sub-grade preparation and all compaction;
• Furnishing and installing VCP sewer pipe as indicated on the Drawings, including fittings and appurtenances;
• Disposal of excess excavated material;
• Removal and replacement where necessary of interfering portions of existing sewer pipes and improvements;
• Placing, joining, and retaining pipe, bends, adapters, couplings, vertical and horizontal offsets, restrained or harnessed joints, end caps, and other fittings not included in other bid items;
• Erosion and sediment control;
• Restoration of damaged and disturbed street improvements; and • Temporary resurfacing, permanent asphalt concrete and concrete resurfacing as needed; and
• Concrete cross gutter repair.
• All other labor, equipment and material incidental to the installation of the pipe, complete in place.

Full compensation for installing VCP and HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bells at existing structures. Work to make connections to the City -installed bells shall be included in this bid item.

Additive Bid Schedule Item No. 6A – Furnish and Install New Weir Manhole (Work Zone 1)
The UNIT PRICE is for this work includes furnishing and installation of new hybrid PVC weir manhole as detailed in Drawing C-10. Included in the cost is pavement cutting removal, excavating, furnishing and installing the new weir manhole with slide gate and weir blocks.

Additive Bid Schedule Item No. 7A – Pipe Installation Between MH A08-010 to MH B08-196 (Work Zone 2)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 10” HDPE pipe between and connect to MH A08-010 and MH B08-196 in Work Zone 2: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be

01 29 03-6
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

Additive Bid Schedule Item No. 8A – Pipe Installation Between MH B08-196 to B08-113 (Work Zone 3)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” SS between MH B08-196 and B08-113 in Work Zone 3: pipe bursting during construction, including excavation, and inspections during pipe bursting process. Open cut installation shall include the costs described in Bid Schedule Item No. 5A.

Full compensation for installing VCP and/or HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

City shall install bells at existing structures where open cut is utilized. Work to make connections to the City-installed bells shall be included in this bid item.

Additive Bid Schedule Item No. 9A – Pipe Installation Between MH B08-113 to MH B08-077 (Work Zone 4)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” HDPE pipe between and connect to MH B08-113 and MH B08-077 in Work Zone 4: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

Additive Bid Schedule Item No. 10A – Pipe Installation Between MH B08-077 to MH B08-062 (Work Zone 5)
The LUMP SUM price is for this work shall include all necessary equipment, materials, and labor needed to install the 12” HDPE pipe between and connect to MH B08-077 and MH B08-062 in Work Zone 5: pipe bursting during construction, including excavation, and inspections during pipe bursting process.

Full compensation for installing HDPE Pipe including all labor, equipment, materials, tools and incidentals, and for conforming to all applicable provisions of the Standard Specifications, these Special Provisions, and the requirements of the City, shall be considered as included in the unit prices paid per linear food of pipe installed, complete and in place, and no additional compensation will be allowed therefor.

01 29 03-7
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

PART 2 - GENERAL

2.1 GENERAL
A. Payment will be made at the price bid for each item listed on the bidding form or as extra work as provided in the General Conditions.

B. No initial progress payment (other than a single mobilization payment as described in Article 1. 3 below) will be made prior to acceptance by the ENGINEER of the CPM Construction Schedule, the associated Schedule of Costs, and the list of anticipated submittals.

C. No subsequent progress payment will be made prior to receipt by the ENGINEER of the monthly update of the Construction Progress Schedule, as specified in Sections 01 31 19, Project Meetings and 01 32 16, Progress Schedule.

D. No subsequent progress payment will be made prior to receipt by the ENGINEER of Certified Payroll for the previous month.

2.2 SCHEDULE OF COSTS FOR PAYMENTS
A. Submit to the ENGINEER, within 5 days of acceptance of the Construction Schedule, five (5) copies of a Schedule of Costs. The Schedule of Costs shall be a form showing a detailed breakdown of quantities and prices of work and materials required to perform and complete the contract.

B. The Schedule of Costs shall provide a cost breakdown for each element detailed in the approved Construction Schedule. The total of the price breakdown must agree with the lump-sum price bid. The elements listed and price breakdown shall not be front end loaded or unbalanced, shall be subject to adjustment between the ENGINEER and the CONTRACTOR, and will be used as a basis for progress payments.

C. The Schedule of Costs will be used as a basis for determining the amount of the monthly progress payments.

D. Acceptance of the Schedule of Costs by the ENGINEER shall not relieve the CONTRACTOR of the responsibility of performing all the work needed to complete the project at the lump-sum price bid.

2.3 PAYMENT FOR MOBILIZATION
A. Mobilization Cost Breakdown:

1. As soon as practicable after receipt of the Notice to Proceed, the CONTRACTOR shall submit a breakdown to the ENGINEER for approval, which shall show the estimated value of each major component of mobilization.

2. When approved by the ENGINEER, the breakdown will be the basis for initial progress payments in which mobilization is included.

3. Said breakdown shall not be "front end loaded" or unbalanced.

B. One CONTRACTOR payment may be made prior to acceptance of the Construction Schedule, Schedule of Costs, and list of anticipated submittals.

01 29 03-8
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Payment shall be limited to mobilization items only.

2. The Construction Schedule is described in Section 01 32 13, Simplified Project Schedule

3. Mobilization items are described in Section 01 71 13, Mobilization.

4. The Schedule of Costs is described in Paragraph 1.2 of this Section.

5. The list of anticipated submittals is described in Section 01 33 03, Submittal Procedures.

2.4 PROGRESS PAYMENTS
A. Progress Payment Request Submittal:

1. Unless otherwise mutually agreed, by the 25th of each month, the CONTRACTOR shall prepare and submit monthly progress payment requests for work completed through the 25th day of the month.

2. Said payment request shall be based on the breakdown of activities as specified in the Schedule of Costs described in Paragraph 1.2 above.

3. The monthly schedule update shall be submitted as part of the monthly progress payment report.

B. The ENGINEER will review progress payment requests and make a determination of the percent completion of all activities (rounded to the nearest whole percent) based on an approximate measurement of all materials supplied and work performed.

C. In the event that the CONTRACTOR fails to provide the OWNER with an acceptable Monthly Contract Record Drawing Submittal in accordance with Section 01 33 03, Submittal Procedures the OWNER shall deduct compensation for such monthly submittal as provided in Section 01 32 13, Simplified Project Schedule . Said deduction shall become the sole property of the OWNER.

D. Retention:

1. From the amount thus determined, five percent thereof will be deducted as retention by OWNER for performance security.

2. Acceptance of separate components shall not operate to release performance retention.

3. The amount of all payments previously made to the CONTRACTOR and any amounts due the OWNER from the CONTRACTOR for supplies, materials, services, damages, or otherwise deductible under the terms of the contract will be deducted from the remainder.

4. The remaining amount will be paid as a progress payment by the OWNER to the CONTRACTOR on the third Friday of the succeeding month or as soon thereafter as is practical.

E. In addition to the retention under Paragraph D above, the whole or part of any payment of the estimated amount due the CONTRACTOR may be withheld as an additional retention if such course be deemed necessary to protect the OWNER from loss due to the CONTRACTOR’s failure to perform any of the following: (1) meet CONTRACTOR’s payment obligations; (2) execute the work; (3) correct defective work; (4) settle damages as provided; or (5) produce substantial evidence that no stop notices will or have been filed, and/or if it has been determined that unpaid balances may be insufficient to complete the work.

01 29 03-9
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

F. All material and work covered by progress payments thereupon become the sole property of the OWNER, but this provision shall not be construed as relieving the CONTRACTOR from sole responsibility for all materials and work upon which payments have been made or the restoration of any damaged work or as a waiver of the OWNER’s right to require fulfillment of all of the contract terms. Said CONTRACTOR’s obligation extends through the close of the warranty period.

G. Payment for Materials:

1. No payment shall be made for materials stored offsite.

2. Payment may be made for those materials delivered to the site but not incorporated in the work to the extent that the materials are included in the Construction Schedule as cost-loaded material delivery activities.

3. Only material items manufactured specifically for this project and that cost individually in excess of $20,000 will be considered for partial payment as stored materials.

4. Partial payment for materials delivered will not be made before the respective shop drawings, installation instructions and O&M manuals have been submitted, reviewed, and accepted in accordance with Section 01 33 03, Submittal Procedures.

5. To receive partial payment for materials delivered to the site, but not incorporated in the work, it shall be necessary for the CONTRACTOR to submit to the ENGINEER, at least 7 days prior to the end of said month, a list of such materials.

6. At their sole discretion, the ENGINEER will approve items for which partial payment is to be made.

7. The list of materials and invoices shall be clearly identified by referencing the associated activity or item on the price breakdown.

8. Partial payment for materials delivered to the site or a bonded warehouse will be made in an amount equal to 75% of the respective suppliers ’ invoices(s) for the actual net cost for the item(s) delivered plus delivery charges.

9. The CONTRACTOR's actual net cost for the materials must be supported by invoices of suppliers.

10. Proper storage and protection of materials shall be provided by the CONTRACTOR.

Final payment shall be made only for materials actually incorporated in the work and, upon acceptance of the work, all materials remaining for which advance payments had been made shall revert to the CONTRACTOR, unless otherwise agreed, and partial payments made for these items shall be deducted from the final payment for the work.

2.5 FINAL PAYMENT AND RELEASE OF CLAIMS

1. Upon the completion of the work as determined by the ENGINEER, a Notice of Acceptance will be issued and recorded with the County.

2. The OWNER will pay to the CONTRACTOR within 35 days after filing of the Notice of Acceptance, or as soon thereafter as practicable, the remaining amount due the CONTRACTOR including retainage, less all prior payments and advances whatsoever to or for the account of the CONTRACTOR for supplies, materials, services, damages, stop notices, or otherwise deductible under the terms of the contract.

3. All prior estimates and payments including those relating to extra work shall be subject to correction by this payment, which throughout this contract is called "Final Payment".

01 29 03-10
Measurement and Payment
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2.6 RELEASE OF CLAIMS:

A. Neither the final payment nor any part of the retained percentage shall become due until the CONTRACTOR shall have delivered to the OWNER a complete release of all claims against the OWNER arising under and by virtue of this contract and related to undisputed amounts, including claims of Subcontractors and suppliers of either materials or labor.

B. If disputed contract claims in stated amounts are unresolved 35 days after issuance of the Notice of Acceptance, a progress payment of undisputed amounts and retained funds will be made by OWNER upon receipt of a release specifically excluding the disputed contract claims.

C. Claims by the OWNER against the CONTRACTOR for liquidated damages or actual damages or other causes will be a valid basis for withholding of funds by the OWNER.

D. Upon resolution of disputed claims the CONTRACTOR shall execute a supplemental release and, upon delivery the OWNER will make final payment.

PART 3 - PRODUCTS (NOT USED)
PART 4 - EXECUTION (NOT USED)

++ END OF SECTION ++

01 31 13-1
Coordination
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024 April 2024
WWE Project: 23-056 BID SET BID SET

SECTION 01 31 13

COORDINATION

This specification is based on the APWA Standard Specification 01 31 13.

PART 1 - GENERAL

1.1 SECTION INCLUDES
A. Coordination among CONTRACTOR’s employees and Subcontractors, and ay utility company, separate contractor, property owner, OWNER, and authority having jurisdiction.

1.2 COORDINATION WITH ENGINEER
A. Cooperate with ENGINEER, inspectors, and separate contractors to establish on -site lines of authority for communication.

B. Develop procedures for handling submittals, reports, records, recommendations, coordination drawings, and schedules.

C. Notify in writing of problems that develop during construction.

D. Ensure agency responsible for operation and maintenance of the completed facility is advised before a project or parts thereof are open for use.

E. Maintain and operate the Work until accepted and turned over to the agency responsible for operation and maintenance.

1.3 COORDINATING WITH PRIVATE AND PUBLIC AGENCIES
A. Notify private and public agencies affected by the proposed construction, coordinate required adjustments, and arrange for all necessary adjustments of utilities within or adjacent to the limits of construction.

B. Obtain utility locations from the one call center ( USA North 811 ) or other utility coordination service two (2) to seven (7) working Days before any excavation.

Locations must be updated every 14 Days.

C. All utilities and utility appurtenances within the limits of the Work that are to be relocated or adjusted shall be moved by the affected utility company, unless specified otherwise.

D. Notify police, fire and transit authority.

E. CONTRACTOR shall install Variable Message Signs/VMS notification boards 14 -days prior to initiating a street closure.

01 31 13-2
Coordination
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024 April 2024
WWE Project: 23-056 BID SET BID SET

1.4 COORDINATING WITH SEPARATE CONTRACTORS
A. Coordinate with separate contractors at no additional cost to OWNER to leave Work complete and finished.

B. Inspect and promptly report any apparent discrepancies or defects in work done by separate contractors that render Work unsuitable for proper execution and results.

Failure to inspect and report shall constitute acceptance of separate contractor's work as fit and proper to receive work of this contract, except as to defects that may develop in the other separate contractor's work after the execution of the CONTRACTOR's work.

1.5 COORDINATING WITH PROPERTY OWNER
A. Notice: Notify property owner 30 Days before the start of construction and at least 48 hours in advance of the interruption of utility service or the interruption of access, or restricted parking.

1. Contractor shall be required to produce and distribute door hanger notification to all affected businesses and residents as identified at the frequency listed below:
a. 30 days – door hanger, commercial only
b. 14 days – door hanger, residential and commercial
c. 7 days – door hanger, residential and commercial
d. 3 days – door hanger, residential and commercial
e. Day of – door hanger, residential and commercial

2. Advance notice (45 days) will be given to:
a. Denio’s Farmers Market
b. Union Pacific Railroad (UPRR)
c. All other affected commercial businesses
B. Access: Provide all weather access to property owner at all times, unless property owner or ENGINEER approve otherwise.

1. Denio’s Farmers Market operates Friday through Sunday and therefore, no work shall occur near Atkinson on these days.

2. All sidewalks to Denio’s Farmers Market shall remain open Friday through Sunday C. Easements: Where work is on easements on private property, coordinate work with the property owner so that work will minimize inconvenience to property owner.

D. Refuse Collection:

1. Inform all affected property owners ahead of time by written notice of the place of deposit and time when their refuse will be collected.

2. If necessary haul refuse to nearest point of suitable collection as determined by the refuse collection agency.

E. Mail: Cooperate with the U.S. Postal Service in the delivery of mail.

F. CONTRACTOR is required to apply for their ROW permit a minimum of 14 days prior to mobilization to accommodate time for the City to distribute the 2 week construction notice. CONTRACTOR will need to provide the City with a map of properties for distribution. The CONTRACTOR will still be responsible for the 48 hour and monthly construction updates. Notice shall be based on the template provided by the ENGINEER and be secured to door knob should occupants not be home. Obtain ENGINEER's final

01 31 13-3
Coordination
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024 April 2024
WWE Project: 23-056 BID SET BID SET

review of notice and distribution list/map prior to distribution. As a minimum the notice shall contain the following:

1. name and phone number of CONTRACTOR's representative for the project;

2. name and phone number of Public Relations Supervisor

3. name and phone number of OWNER’s project manager

4. work anticipated for the next 30 days including work locations and work by subcontractors and utility companies;

5. rough estimate of construction schedule through end of work affecting area;

6. anticipated impact to driveway approach access and closures;

7. anticipated water, sewer or power outages;

8. anticipated vehicular traffic impacts, rerouting or lane closures;

9. anticipated pedestrian impacts and sidewalk closures;

10. changes to public transportation bus routes; and

11. any other construction or work items which will impact or restrict the normal use of streets and amenities.

Failure to comply with this contract provision is considered grounds for project suspension per Article 15.1 of the General Conditions (APWA Document 00 72 00, page 71).

1.6 INTERRUPTION OF UTILTIES
A. Notify fire and police services in local jurisdiction if emergency is safety related or if construction activities interrupt any utility service.

B. Contact the affected utility company. Find out how soon repairs can be made as well as when the repairs will begin.

C. Contact the affected local residences or businesses. Inform when repairs will begin and how long it will take to complete them.

D. Inform ENGINEER and OWNER.

1.7 INTERRUPTION OF OWNER’S OPERATIONS
A. If any aspect of normal OWNER operations needs to be interrupted for completion of the Work, notify ENGINEER in writing.

B. Submit notice with an alternate plan to cover contingency problems. In the alternate plan allow for maintenance of utilities or other essential services that must be interrupted for any period otherwise deemed necessary by OWNER to be unacceptable for necessary OWNER operations.

C. Shutdown of utilities must be accomplished during approved hours at no additional cost to OWNER. If work requires a longer shutdown, it must then be accomplished during separate periods.

D. Do not proceed with proposed shutdown without written approval.

01 31 13-4
Coordination
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024 April 2024
WWE Project: 23-056 BID SET BID SET

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)

++ END OF SECTION ++

01 31 19-1
Project Meetings
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 31 19

PROJECT MEETINGS
PART 1 - GENERAL

1.1 PRE-CONSTRUCTION CONFERENCE
A. Upon receipt of the Notice to Proceed, or at an earlier time if mutually agreeable, the ENGINEER will arrange a preconstruction conference to be attended by the CONTRACTOR's superintendent or other project representative authorized to commit on the behalf of the CONTRACTOR and to direct the performance of the work by others, the CITY, the ENGINEER or ENGINEER’s representative, and representatives of utilities, major subcontractors, and others involved in the execution of the Work.

B. The purpose of this conference will be to establish a working relationship and understanding between the parties and to discuss subjects as may be pertinent for the execution of the work.

C. CONTRACTOR shall be prepared to discuss the following subjects, as a minimum:

1. Required schedules.

2. Status of Bonds and insurance.

3. Sequencing of critical path work items.

4. Progress payment procedures.

5. Project changes and clarification procedures.

6. Use of site, access, and storage areas, security and temporary facilities.

1.2 PROGRESS MEETINGS
A. The ENGINEER will arrange and conduct progress meetings. The ENGINEER will prepare and circulate a draft agenda of each meeting. The CONTRACTOR may add items as appropriate to the draft agenda.

B. Progress meetings will be conducted on a regular basis, at such frequency as the CITY and CONTRACTOR may mutually agree. Progress meetings shall be attended by the ENGINEER, CITY Operations personnel, CONTRACTOR's superintendent or other project representative, and representatives of all subcontractors involved in the work at the time of the meeting, required by the CONTRACTOR, or requested by the CITY.

C. The purpose of the meetings will be to facilitate the work of the CONTRACTOR and any subcontractor or other organization that is not up to schedule, resolve conflicts, identify and resolve any potential delays or necessary changes in the work and in general, coordinate and facilitate the execution of the Work.

D. The agenda of progress meetings shall include review of work progress, the latest Construction Schedule submittal (monthly), potential project delays, the status of key shop drawings, submittal reviews, information requests, safety concerns, record drawings, and extra work items.

01 31 19-2
Project Meetings
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.3 CONSTRUCTION SCHEDULE REVIEW
A. The Construction Schedule will be reviewed weekly during an agreed upon progress meeting to verify at a minimum:

1. Actual start and finish dates of completed activities since the last progress meeting.

2. Durations and progress of all activities not completed.

3. Critical submittals/materials delivery problems.

4. Potential project delays.

5. Any activity behind schedule and CONTRACTOR's plan to bring it back on schedule.

6. Reason, logic, time, and cost data for Change Order work that is to be incorporated into the Construction Schedule or payment request form.

7. Payment due to the CONTRACTOR based on percentage complete of items in the submittal payment request form.

B. At the progress meeting, the CONTRACTOR shall provide an update of the Construction Schedule as described in Section 01 32 13, Progress Schedule.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)

++ END OF SECTION ++

01 32 13-1
Project Schedule
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 32 13

PROGRESS SCHEDULE
PART 1 - GENERAL

1.1 WORK INCLUDED
A. The work specified in this Secti on includes the CONTRACTOR’s preparation, submittal, maintenance and use of a Critical Path Method (CPM) Construction Schedule to plan and monitor construction progress for the project.

B. The requirements specified under Section 01 33 03, Submittal Procedures, also apply to the Construction Schedule initial submittal(s) and subsequent updates and revisions.

1.2 PREPARATION AND SUBMITTAL PROCEDURE
A. Schedule Preparation and Submittal:

1. The CONTRACTOR ’s on -site construction supervisor (superintendent, project manager, etc.) shall be directly involved in preparation of the Construction Schedule.

2. The Construction Schedule shall be completed and submitted to the ENGINEER within 30 days after Notice to Proceed.
a. By preparing and submitting the Construction Schedule the CONTRACTOR represents that the CONTRACTOR can and intends to execute the work and portions thereof within the specified times and constraints and that the CONTRACTOR’s bid covers the costs associated with the execution of work in accordance with the Construction Schedule.

3. At the time of submittal of the Construction Schedule , CONTRACTOR’s on -site construction supervisor shall review the schedule with ENGINEER’s construction project representative.

4. If the initial Construction Schedule submittal is not acceptable to the ENGINEER, it shall be revised in coordination with observations and comments from the ENGINEER and resubmitted within 7 days of the return of the schedule to the CONTRACTOR.

1.3 CONSTRUCTION SCHEDULE CONTENT
A. The Construction Schedule shall be calendar -based, time -scaled, and show the durations of and relationships between the various work activities.

B. Work activities shall be selected which reflect actual work to be performed for this specific project. No generic work activities shall be allowed.

1. Work activities shall include non -construction activities such as submittal preparation and review, manufacturing, equipment delivery, mobilization, preparation of Contract Record Drawings, etc. for a complete picture of the CONTRACTOR’s plan for project execution.

2. Information on each activity shall include:
a. Concise description of the activity.
b. Duration in working days.

01 32 13-2
Project Schedule
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. The dates for the beginning and completion of each activity. d. The relationship of each activity to other activities.

3. No work activity shall be longer than 10 working days. a. Work tasks which will take longer than 10 working days shall be broken down into several work activities which are no longer than 10 working days. b. Each work activity must be defined clearly and measurable. For example, a series of work activities such as “Building 1, east wall piping; Building 1, west wall piping; Building 1, north and south wall piping”, each with a duration less than 10 days would be acceptable. A series of work activities all labeled “Building 1 Piping”, even if each had a duration less than 10 days, would not be acceptable because the tasks are not defined clearly or measurable.

4. Provide a monthly activity for preparation of Contract Record Drawings, in accordance with Section 01 33 03, Submittal Procedures with a minimum monthly cost of $2,500.

C. The schedule shall be referenced to calendar dates, and the beginning of the contract time shall be the date of receipt of the Notice to Proceed.

D. Failure to include an activity required for the execution of the work shall not excuse the CONTRACTOR from completing the work and portions thereof within the specified times and at the price specified in the Agreement, and from meeting the constraints specified for sequence of work and control dates.

1.4 UPDATING THE CONSTRUCTION SCHEDULE
A. The CONTRACTOR shall review and discuss the project progress relative to the most up to date Construction Schedule (updated monthly) at the weekly progress meetings, as specified in Section 01 31 19, Project Meetings.

B. The schedule update shall reflect progress to date. The schedule update shall incorporate all revisions to logic and duration.

1.5 ADJUSTMENT OF THE CONTRACT TIME AND CHANGE ORDERS A. Adjustments of the contract time due to delays, additional work, or any other cause will only be issued through a contract change order in accordance with the General Conditions.

1. The CONTRACTOR shall include, as part of each change order proposal for which the CONTRACTOR is requesting an adjustment in the contract duration, a proposed revised Construction Schedule.

2. The proposed revised Construction Schedule shall be compared to the most recent Construction Schedule to assess overall schedule impact.

3. If a Change Order is issued by the OWNER, the CONTRACTOR shall incorporate the Change Order into the Construction Schedule.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)

01 32 13-3
Project Schedule
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

++ END OF SECTION ++

01 32 13-4
Project Schedule
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 33 03-1
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 33 03

SUBMITTAL PROCEDURES
PART 1 - GENERAL

1.1 GENERAL
A. General:

1. This Section outlines in general the items that the CONTRACTOR must prepare or assemble for submittal during the progress of the Work.

2. There is no attempt herein to state in detail all of the procedures and requirements for each submittal.

3. The CONTRACTOR's attention is directed to the individual Specification Sections in these Contract Documents , which may contain additional and s pecial submittal requirements.

4. The CITY reserves the right to direct and modify the procedures and requirements for submittals as necessary to accomplish the specific purpose of each submittal.

5. The CONTRACTOR shall anticipate resubmitting submittals for major pieces of equipment and for control systems.

6. Should the CONTRACTOR be in doubt as to the procedure, purpose, or extent of any submittal, inquiries shall be directed to the ENGINEER.

B. Schedule of Submittals:

1. Within 30 working days after the Notice to Proceed, CONTRACTOR shall submit all submittals to start construction including, but not limited to, any priority submittals identified during the Design-Assist process.

2. This list shall be updated with "late start" submittal dates within 15 working days of submittal of the CONTRACTOR's Construction Schedule.

3. The submittal dates shall be updated upon approval of the Construction Schedule and periodically thereafter.

4. Any additional submittals shall also be included in updates.

5. Additional submittals and resubmittals shall be provided in a timely manner without delaying the project.

1.2 ADMINISTRATIVE SUBMITTALS
A. The CONTRACTOR is reminded of their obligation as required by law to make required submittals promptly to the applicable federal, state, or local agency. Failure to comply with this requirement may result in the withholding of progress payments and make the CONTRACTOR liable for other prescribed action and sanctions.

B. The CONTRACTOR shall submit to the ENGINEER a copy of all letters relative to the Contract, transmitting notifications, reports, certifications, certified payrolls, and the like, that the CONTRACTOR submits directly to a federal, state, or other governing agency.

C. During the performance of the Contract, the CONTRACTOR shall maintain on a daily basis, and submit to the ENGINEER as requested, full and correct information as to the number of persons employed in connection with each subdivision of the work, the classification, rate of pay, citizenship status, and address of each person, and the cost,

01 33 03-2
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

source, and amount of each class of materials delivered, equipment received, and major construction equipment used in each subdivision of the work.

D. Certified Payroll:

1. No later than the 25th day of each month, the CONTRACTOR shall submit to the ENGINEER a copy of the CONTRACTOR’s certified payroll for the previous month, and if requested, copies of certified payrolls for Subcontractors.

2. The payrolls shall include for each employee the full name, address and social security number; the correct classification and rate of pay (including rates of contributions for, or costs assumed to provide various fringe benefits); daily and weekly hours worked; itemized deductions and actual wages paid.

3. The certified payrolls shall be on State of California forms.

1.3 TECHNICAL SUBMITTALS
A. General:

1. Requirements in this Section are in addition to any specific requirements for submittals specified in other divisions and Sections of these Contract Documents.

2. Submittal Contents and Numbering:
a. Each submittal shall have the specification Section and applicable paragraph number clearly identified on the front of the submittal transmittal form for each item submitted. The number shown on the transmittal form for each item shall be labeled in the content of the submittal. For example, if Item 1 is a ball Valve and Item 2 is a gate valve then the cut sheets for each respective valve shall be labeled Item 1 and Item 2.
b. Each submittal shall be sequentially numbered starting with the first one delivered for each spec section. For example, the first submittal for Section 02 41 03 should be 02 41 03-1-0.
c. Resubmittals shall include the number of the original submittal plus the suffix "-1" for the first resubmittal, "-2" for the second resubmittal. For example, a second resubmittal would be shown as 02 41 03-1-1. Each resubmittal shall be the whole version of the corrected submittal, and shall not reference past versions. Each resubmittal shall include all items including items previously marked as NET. d. Submittals not conforming to these requirements will be rejected. e. If several items (i.e. different types of valves) are combined into the same submittal, none of the items will be approved for installation until the entire submittal is accepted.

3. Submitted data shall be fully sufficient in detail for determination of compliance with the provisions and intent of the Contract Documents.

4. Coordination Responsibilities:
a. Shop drawing submittal and coordination are the responsibility of the CONTRACTOR; this responsibility shall not be delegated in whole or in part to Subcontractors or suppliers.
b. Designation of work "by others," if shown on shop drawings, shall mean that the work will be the responsibility of the CONTRACTOR rather than the Subcontractor or supplier who has prepared the shop drawings.

5. No equipment or material for which listings, drawings, or descriptive material is required shall be fabricated, purchased, or installed until the ENGINEER has reviewed and accepted such lists, final shop drawings, or other descriptive material.

Installation of such equipment or material without accepted submittals will be considered defective work.

6. Submittal Review Time:

01 33 03-3
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

a. Submittals will be acted upon by the ENGINEER as promptly as possible and returned to the CONTRACTOR not later than the time allowed for review in Paragraph 1.3.B.2 below.
b. The CONTRACTOR shall provide in their Construction Schedule the time for CITY review of each submittal (and resubmittal for major equipment and control systems) in accordance with the allowable time specified herein and in Section 01 32 13, Progress Schedule.
c. This required time for CITY review shall not be a cause for delay in contract completion nor shall it be a reason for an extension of contract time. d. If the CONTRACTOR is required by the CITY to resubmit data, then neither the time required for the CONTRACTOR to prepare and resubmit such data, nor the required time for CITY review, shall be a cause for delay in contract completion or for an extension of contract time.
e. Responsibility for time required for preparing and submitting required data shall be assigned solely to the CONTRACTOR.

7. Excessive Submittal Review:
a. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal item.
b. Additional costs of the ENGINEER's review beyond the second submission shall be the responsibility of the CONTRACTOR and may be deducted from the monthly progress payments.
c. This applies to all submittals including shop drawings.

8. Changes After Review:
a. After a submittal has been reviewed and accepted, no changes or substitutions in that submittal will be allowed without the ENGINEER's approval. b. If allowed, the CONTRACTOR will be responsible for the additional costs for engineering, administrative, clerical or other work required for additional review.

9. Intent of Review:
a. Shop drawings will be reviewed for general conformance with the drawings and specifications.
b. The intent of the review is to determine if the CONTRACTOR is submitting materials and equipment which are in general conformance with the Contract Documents.
c. Detailed review of dimensions, sizes, space requirements, coordination with other equipment, and other construction details is not performed. d. Additional work and costs, resulting from errors in the shop drawings shall be the CONTRACTOR's responsibility and liability.
e. Accuracy, coordination, and completeness of shop drawings shall be the sole responsibility of the CONTRACTOR, including responsibility to backcheck comments, corrections, and modifications from the ENGINEER's review before fabrication.

10. The CONTRACTOR shall indicate on the submittal transmittal form if and how the submittal deviates from the contract requirements. In addition, CONTRACTOR shall include a copy of the relevant specification section in its entirety marked with ACCEPT/DEVIATE next to each paragraph. Failure to include this documentation is grounds for ENGINEER to reject and return the Submittal to the CONTRACTOR for resubmission.

11. Rebar Shop Drawings:
a. The CONTRACTOR shall supply the ENGINEER with a copy of all reinforcing steel detail drawings.

01 33 03-4
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

b. Changes to the Contract Documents made by the CONTRACTOR in reinforcing steel shop drawings shall be called out in the letter of submittal. c. Such changes will not be acceptable unless the ENGINEER has expressed consent to such changes in writing.

12. Submittals of shop drawings, layout diagrams, catalog cuts and data, test reports, and information in sufficient detail to show complete compliance with all specified requirements shall be furnished to the ENGINEER, covering but not limited to the following items (as applicable):

Aggregate Base Course
Asphalt mixes
Caulking and sealing compounds
Chemical systems
Concrete mixes
Control panels
Demolition plan
Detection systems
Electrical conduit, wire and specials
Electrical fixtures and appliances
Electrical load centers
Electrical substations
Electrical conduit, wire and specials
Engineered fill
Engines and appurtenances
Equipment provided by the CONTRACTOR
Fences, barricades and gates
Gas monitoring systems
Generators and appurtenances
Glazing
Grating
Gravel bedding
Grout
Hardware
Imported fill
Indicators
Instrumentation
Landscaping
Lights and lighting fixtures
Meters
Miscellaneous fabricated metals
Motor control centers
Motors, starters and controls
Paints, coatings and finishes
Pipe, fittings and specials
Pipe supports and anchors
Planting plan
Plumbing fixtures
Precast concrete elements
Pressure gauges
Primary elements
Programmable logic controllers
Pumps

01 33 03-5
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Recorders
Reinforcing steel and layout drawings
Sheet pile, shoring and bracing
Signs
Structural steel
Temporary bypasses
Temporary dewatering systems and equipment
Valve and gate operators and controllers
Valves and gates
Variable frequency drives
B. Submittal Procedure:

1. The CONTRACTOR shall submit to the ENGINEER for review one (1) electronic copy of each submittal (shop drawings, electrical diagrams, and catalog cuts for fabricated items and manufactured items furnished under this Contract, etc.)

2. Shop drawings shall be submitted in sufficient time to allow the ENGINEER not less than twenty (20) working days for examining the shop drawings except for designs for turnkey items for which thirty (30) working days will be allowed, and substitutions for which (40) working days will be allowed.

3. Shop drawings shall be accurate, distinct, and complete, and shall contain all required information, including satisfactory identification of items, units, and assemblies in relation to the Contract Drawings and Specifications.

4. CONTRACTOR Certification:
a. Shop drawings shall be submitted only by the CONTRACTOR, who shall indicate by a signed stamp on the shop drawings, or other approved means, that the CONTRACTOR has checked and approved the shop drawings, and that the work shown is in accordance with Contract requirements and has been checked for dimensions and relationship with work of all other trades involved. b. Submitting incomplete or unchecked shop drawings for the ENGINEER to correct or finish will not be acceptable, and shop drawings that, in the opinion of the ENGINEER, indicate that they have not been checked by the CONTRACTOR will be rejected and returned to the CONTRACTOR for resubmission in the proper form.

5. Return of Reviewed Submittals:
a. When the shop drawings have been reviewed by the ENGINEER, the appropriate number of submittals will be returned to the CONTRACTOR appropriately stamped.
b. If major changes or corrections are necessary, the shop drawing will be rejected and returned to the CONTRACTOR with the need for such changes or corrections indicated.
c. The CONTRACTOR shall correct and resubmit rejected shop drawings in the same manner and quantity as specified for the original submittal. d. If changes are made by the CONTRACTOR (in addition to those requested by the ENGINEER) on the resubmitted shop drawings, such changes shall be clearly explained in a transmittal letter accompanying the resubmitted shop drawings.

6. The review of such shop drawings and catalog cuts by the ENGINEER shall not relieve the CONTRACTOR from responsibility for correctness of dimensions, fabrication details, coordination with other work, and space requirements, or for deviations from the Contract Drawings or Specifications, unless the CONTRACTOR has called attention to such deviations in writing by a letter accompanying the shop drawings and the ENGINEER approves the change or deviation in writing at the time of submission; nor

01 33 03-6
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

shall review by the ENGINEER relieve the CONTRACTOR from the responsibility for errors in the shop drawings.

7. The CONTRACTOR agrees that shop drawing submittals processed by the ENGINEER do not become Contract Documents and are not Change Orders; that the purpose of the shop drawing review is to establish a reporting procedure and to permit the ENGINEER to monitor the CONTRACTOR's progress and understanding of the design.

C. Shop Drawing Requirements: Shop drawings referred to herein shall include shop drawings, catalog cuts and information schematic diagrams, and other submittals for both shop and field-fabricated items. The CONTRACTOR shall submit, as applicable, the following for all prefabricated or manufactured structural items, material, and equipment:

1. General:
a. For structures, submit all shop, setting, equipment, miscellaneous iron and reinforcement drawings and schedules necessary for construction. The foregoing shall include detailed "pour drawings" which shall show the sequence of concrete placement, and the type, quantity and location of all embedment items (sleeves, anchor bolts, door frames, etc.)
b. For pipelines, submit a detailed layout of the pipeline with details of clearances for crossings, bends, closure pieces and fabricated specials and furnish any other details necessary.
c. For trench excavation, submit detailed plan showing the design of shoring, bracing, sloping or other provisions necessary for safety. d. For boring and jacking, submit a detailed description of the process to be used. e. For equipment which requires electrical service, submit detailed information to show power supply requirements, MCC and control panel, elevations, wiring diagrams, control and protection schematics, shop test data, operation and maintenance procedures, outline drawings, and manufacturer's recommendation of the interface/interlock among the equipment.
f. For mechanical equipment submit all data pertinent to the installation and maintenance of the equipment including shop drawings, anchorage requirements, manufacturer's recommended installation procedure, detailed installation drawings, test data and curves, operation and maintenance manuals, and other details necessary.
g. For architectural fabrication submit all data pertinent to the installation of the fabrications, including shop drawings, manufacturer's recommended installation procedure, detailed installation drawings, and other details necessary. h. For shop drawings or equipment drawings, including dimensions, size , and location of connections to other work, and weight of equipment. i. Installation or placing drawings for equipment, drives, and bases. j. Supporting calculations for equipment and associated supports, or hangers required or specified to be designed by equipment manufacturers, including seismic restraint information and details.
k. Complete coating manufacturer's specifications, including materials description and paint system.
l. Performance data and head vs. flow curves for compressor and pumps. m. Suggested spare parts list with current price information. n. List of special tools required for checking, testing, parts replacement, and maintenance. (Special tools are those which have been specially designed or adapted for use on parts of the equipment, and which are not customarily and routinely carried by maintenance mechanics.)

01 33 03-7
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

o. List of special tools furnished with the equipment.
p. List of materials and supplies required for the equipment prior to and during startup.
q. Installation instructions.
r. List of materials and supplies furnished with the equipment. s. Samples of finish colors for selection.
t. Special handling instructions.
u. Requirements for storage and protection prior to installation. v. Requirements for routine maintenance required prior to plant startup. w. Startup and operating instructions.
x. Seismic design calculations and restraint details for equipment and piping supports. Calculations shall be stamped by a Civil or Structural Engineer registered in the State of California.

2. Electrical:
a. Wiring and control diagrams of systems and equipment. Local control panel details.
b. List of special motor features being provided ( e.g., space heaters, altitude corrections, thermal protectors, mounting arrangement, etc.). c. Complete motor rating for all motors, including motor no -load, starting, and full-load current at rated voltage; full -load speed and full -load current at 110 percent voltage; motor service factor; motor efficiency and power factor at 1/2, 3/4, and full-load at rated voltage; recommended maximum kVAR of power factor correction capacitors when capacitors are switched with motor. d. See Division 26, ELECTRICAL, for additional specific submittal requirements.

3. Instrumentation and Control:
a. See Technical Sections for additional specific submittal requirements. b. The submittals shall include satisfactory identification of items, units, and assemblies in relation to the Specification Section number, and the system or equipment identification or tag number shown on the Drawings, the Process and Instrumentation Diagram (P&ID), or as provided in applicable Specification Section.

D. Submittals required for foreign-manufactured items:

1. In addition to the submittal requirements stated above, suppliers of foreign-manufactured items shall submit the names and addresses of companies within the United States that maintain technical service representatives and a complete inventory of spare parts and accessories for each foreign -made item proposed for incorporation into the work. Failure to provide the foregoing capabilities shall be just cause for rejection of the foreign-manufactured items.

E. Final shop drawings to be submitted to CITY:

1. Complete sets of reproducible (full size mylar or vellum base) final shop drawings shall be submitted to the CITY before, or at the time of, delivery of equipment onto the site.

F. Seismic loading design provisions:

1. All equipment supports that are not specifically detailed on the Drawings or specified herein shall be the responsibility of the equipment manufacturers and shall be designed by a Civil or Structural Engineer registered in the State of California.

2. The design shall be in accordance with the seismic provisions of the latest edition of the 2016 edition of the California Building Code (CBC) and of the seismic design

01 33 03-8
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

requirements listed in Section 01 61 03, General Product Requirements, in addition to all other loading conditions.

G. Submittal of interface information (connection and correlation with other work):

1. Where called for in the Specifications, and as determined necessary by the ENGINEER to provide proper correlation with other equipment, complete interface information shall be submitted.

2. This interface information shall be accurate and contain all information necessary to allow the completion of detailed design and construction of the interfacing or connecting work.

3. The CONTRACTOR shall include in their negotiation for subcontract work, such agreements as may be necessary to ensure the accuracy of Subcontractor’s interface submittal information.

4. In the event additional costs are incurred due to subsequent changes to information given in said interface information, such additional costs shall be borne by the CONTRACTOR.

H. Record Drawings

1. The CONTRACTOR shall deliver to the OWNER one complete set of final Record Drawings for OWNER records before the contract will be accepted by the OWNER.

The Record Drawings will consist of a set of reproducible drawings of all CONTRACTOR supplied equipment (including control systems) and a marked-up set of Contract Record Drawings.

2. Record Drawings of CONTRACTOR-Supplied Equipment
a. Drawings shall be provided in electronic pdf form.
b. The overall dimensions of each drawing submitted to the ENGINEER shall be equal to one of the OWNER's standard sheet sizes. The title block area in the lower right hand corner of each drawing shall be clear of all linework, dimensions, details, and notes, except for the CONTRACTOR's title block. The dimensions of the title block area are minimum and are measured from the edges of the drawing sheet.

DRAWING FORMAT
Sheet Sizes
Height x Width
Title Block Area
Height x Width
11" x 8-1/2" 2-1/2" x 3-3/4"
11" x 17" 3" x 4"
22" x 34" 3-1/2" x 8"

3. Contract Record Drawings
a. The CONTRACTOR shall keep an up-to-date set of marked-up Contract Drawings on an OWNER-supplied set of Drawings.
b. The OWNER-supplied set of Drawings will consist of one set of full -size sepia reproductions of the Contract Drawings, supplied to the CONTRACTOR at the start of the work.

01 33 03-9
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. During the progress of the work, the CONTRACTOR shall record on the Contract Record Drawings any changes from or additions to the work described in the Plans and Specifications.
d. All information recorded on the Contract Record Drawings shall be clearly legible. e. Information to be recorded on the Contract Record Drawings shall include, but not be limited to, the following:
1) Actual routing of electrical conduits, whose routing is only indicated in general on the Drawings.
2) Actual location of manhole structures.
3) Actual alignment of all installed pipe.
4) Specific details of pipe connections, and manhole structures. 5) Specific details on the installation and connection of mechanical and electrical equipment.
6) Field dimensions where they differ from those shown on the Drawings. 7) Additions to and/or deletions from the work, including all contract change orders.
8) Other details showing as-built conditions, which are shown differently or only in general on the Drawings.
9) Addenda.
10) Location of buried features located during construction except utility service connections.
f. It is the CONTRACTOR's responsibility to ensure that any changes, deletions, specific construction details, etc., performed by a Subcontractor are recorded on the Contract Record Drawings.
g. Location Survey:
1) The CONTRACTOR shall professionally survey the lateral and vertical position of anything buried underground as part of this Contract to within one inch accuracy of the benchmark and baseline provided by the OWNER. 2) The survey information shall be included on the record drawings and the CONTRACTOR shall not be allowed to cover the buried materials until after the OWNER’s inspector has verified the information as accurate and complete, and is shown on the record drawings.
h. Once every month, starting from the completion of mobilization as defined in Section 01 71 13, Mobilization, the CONTRACTOR shall provide the OWNER with a copy of the then up -to-date set of marked -up Contract Record Drawings in accordance with the provisions under Section 01 29 03, Measurement and Payment, and Section 01 32 16, Project Schedule.
i. At the end of the work, prior to Project Closeout, the CONTRACTOR shall provide the OWNER with the Contract Record Drawings, showing all "as-built" conditions. j. See also Section 01 77 03, Operational Completion and Project Closeout.

I.

I. Operation and Maintenance (O&M) Manuals:

1. The CONTRACTOR shall furnish five (5) hard -copies (if requested by the Owner at project completion) and two ( 2) electronic cop ies on USB drives of a complete instruction manual for installation, operation, maintenance, and lubrication requirements for each component of mechanical and electrical equipment or system.

2. All equipment manufacturers shall be made aware of these requirements and all associated costs shall be included in the costs for furnishing the equipment or system.

01 33 03-10
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3. O&M Submittal Review Checklist:
a. The CONTRACTOR shall include a completed O&M Manual Submittal Review Checklist (copy included at the end of this Section) with each O&M manual submittal.
b. The checklist shall indicate that the O&M manual as submitted complies in all respects to the contract requirements.
c. Any O&M manual submitted without a completed checklist will be rejected.

4. The manuals shall be furnished to the ENGINEER upon the delivery of the respective equipment.

5. No payment will be made for equipment or materials or equipment installation before the respective O&M manuals have been approved by the ENGINEER.

6. Each O&M manual shall be complete in all respects for all equipment, controls, accessories, and associated appurtenances.

7. Each O&M manual shall include, but not be limited to, the following:
a. Diagrams and illustrations, including pump curves indicating operating points. b. Detailed description of the function of each principal component of the system. c. Performance and nameplate data.
d. Installation instructions.
e. Starting procedure
f. Proper adjustment procedure.
g. Test procedures.
h. Operating procedure.
i. Shutdown instructions.
j. Emergency operating instructions and troubleshooting guide. k. Safety instructions.
l. Maintenance and overhaul instructions which shall include detailed assembly drawings with part numbers, parts list, instructions for ordering spare parts, and complete preventive maintenance instructions required to ensure satisfactory performance and longevity of the equipment.
m. Lubrication instructions which shall list points to be greased or oiled, shall recommend type, grade, and temperature range of lubricants, and shall recommend frequency of lubrication.
n. List of electrical relay settings and control and alarm contact settings. o. Electrical interconnection wiring diagram for equipment furnished, including al l control and lighting systems.
p. Recommendations for spare parts and special tools.

8. Hard-Copy O&M Manuals:
a. Each copy of the manual shall be assembled in one or more hard -back type three-ring binders, each with title page, typed table of contents, and heavy section dividers with numbered plastic index tabs.
b. Cover label and title page shall be clearly labeled to designate the project title, project number, Specification Section where the item is specified, system or equipment for which it is intended with reference to the facility, equipment number, and equipment manufacturer name.
c. Typed table of contents for the entire set, identified by volume number, shall appear in each binder.
d. Each manual shall be divided into sections paralleling the equipment specifications.
e. All data shall be hole-punched for binding and composition and printing shall be arranged so that punching does not obliterate any data.

01 33 03-11
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

f. Pages larger than 8-1/2” x 11” shall be folded, showing title block or optionally included in binder pockets.
g. Where more than one binder is required, they shall be labeled "Vol. 1", "Vol. 2", and so on.
h. Submit manual organization and format to the ENGINEER for approval prior to manual preparation.

9. Electronic O&M Manuals:
a. In addition to the designated number of hard -copies for each required Manufacturer’s O&M manual, provide an electronic copy, each on its own separate compact disc/s (CD-ROM).
b. The CD-ROM shall contain one full version of the O&M manual in Adobe’s Portable Document File (PDF) format.
c. In addition, the CD-ROM shall contain the separate text and drawing files used to create the PDF O&M manual.
d. An index shall be provided on the CD-ROM as a separate text file with the name “index” and shall include the file name and detailed description of each individual file included on the CD-ROM.
e. The CD-ROM and the CD-ROM case shall be labeled with the Project title, Project number, Specification section, equipment number, equipment name, and equipment manufacturer name.

10. Manuals shall be transmitted to the ENGINEER upon delivery of the equipment and all equipment shall be serviced in accordance with the manufacturer's recommendations prior to operation. A service record shall be maintained on each item of equipment and shall be delivered to the ENGINEER prior to final acceptance of the project.

J. Manufacturers' certificates and proper installation:

1. The CONTRACTOR shall submit manufacturers' certificates of proper installation for items of equipment as specified under Section 01 75 06, Testing, Training and Startup.

K. Samples and test specimens:

1. Where required in the Specifications, and as determined necessary by the ENGINEER, test specimens or samples of materials, appliances, and fittings to be used or offered for use in connection with the work shall be submitted to the ENGINEER at the CONTRACTOR's expense, with information as to their sources, with all cartage charges prepaid, and in such quantities and sizes as may be required for proper examination and tests to establish the quality or equality thereof, as applicable.

2. All samples and test specimens shall be submitted in ample time to enable the ENGINEER to make any tests or examinations necessary, without delay to the work.

The CONTRACTOR will be held responsible for any loss of time due to their neglect or failure to deliver the required samples to the ENGINEER, as specified.

3. The CONTRACTOR shall submit additional samples as required by the ENGINEER to ensure equality with the original approved sample and/or for determination of Specification compliance.

4. Laboratory tests and examinations that the OWNER elects to make in its own laboratory will be made at no cost to the CONTRACTOR, except that, if a sample of any material or equipment proposed for use by the CONTRACTOR fails to meet the Specifications, the cost of testing subsequent samples shall be borne by the CONTRACTOR.

5. All tests required by the Specifications to be performed by an independent laboratory shall be made by a laboratory approved by the ENGINEER. Certified test results of all

01 33 03-12
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

specified tests shall be submitted in duplicate to the ENGINEER. The samples furnished and the cost for the laboratory services shall be at the expense of the CONTRACTOR and included in the prices bid for the associated work.

6. Approved sample items (fixtures, hardware, etc.) may be incorporated into the work upon approval, and when no longer needed by the ENGINEER for reference.

L. Material and equipment colors:

1. The ENGINEER will provide a schedule of selected colors within 30 days after approval of materials and equipment, and after receiving samples of the manufacturers' standard colors for those items requiring OWNER's selection.

M. Certificates of Compliance:

1. A Certificate of Compliance shall be furnished for materials specified to a recognized standard or code prior to the use of any such materials in the work.

2. The ENGINEER may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance.

3. The certificate shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the Specifications.

4. A Certificate of Compliance shall be furnished with each lot of material delivered to the work and the lot so certified shall be clearly identified in the certificate.

N. Quality Assurance

1. Source limitations: To the greatest extent possible for each unit of work, the CONTRACTOR shall provide products, materials, or equipment of a singular generic kind from a single source.

2. Compatibility of options:
a. Where more than one choice is available as options for CONTRACTOR's selection of a product, material, or equipment, the CONTRACTOR shall select an option which is compatible with other products, materials, or equipment already selected.
b. Compatibility is a basic general requirement of product/material selections.

O. Review by ENGINEER

1. After review by the ENGINEER of each of the CONTRACTOR's submissions, the material will be returned to the CONTRACTOR with actions defined as follows:
a. NO EXCEPTIONS TAKEN: Accepted subject to its compatibility with further submittals and additional partial submittals for portions of the work not covered in this submittal. Does not constitute approval or deletion of specified or required items not shown in the partial submittal.
b. MAKE CORRECTIONS NOTED: Same as 1.a., except that minor corrections as noted shall be made by the CONTRACTOR.
c. REVISE AND RESUBMIT: Rejected because of major inconsistencies or errors which shall be resolved or corrected by the CONTRACTOR prior to subsequent review by the ENGINEER.
d. REJECTED - RESUBMIT: Submitted material does not conform to Plans and Specifications in major respect, e.g., wrong item, wrong size, model, capacity, or material.

2. Review actions (a) and (b) above constitute acceptance by the ENGINEER of the submittal.

P. Requests for Information

01 33 03-13
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Requests for Information about the Contract Documents shall be directed by the CONTRACTOR to the ENGINEER using a Request for Information (RFI) form as agreed to by the OWNER and the ENGINEER. Such requests shall not be transmitted directly to the ENGINEER from a Subcontractor or Supplier.

2. A separate form shall be used for each specific item for which information is required.

Requests for Information for more than one item using a single RFI form will be permitted only when the items are so functionally related that expediency indicates review of the group of items as a whole.

3. The ENGINEER will reply to the CONTRACTOR's Request for Information as soon thereafter as practicable.

Q. Construction Photographs

1. Provide photographs showing the preconstruction site, construction progress, and the post-construction site.

2. Format: Photographs shall be digital format
a. Digital Format:
1) Digital photos shall be taken with a minimum 3.5 mega pixel density and provided in JPG format.
2) Digital photo files shall be provide on a flash drive accompanied by a text file that lists the file name, date photo was taken, and brief description of the photograph and location where the photograph was taken.

3. Take a minimum of 50 photos of the preconstruction site and the property adjacent to the perimeter of the construction site. Particular emphasis shall be directed to structures both inside and outside the site, or as directed by OWNER.

4. Take a minimum of 72 photo s monthly showing the progress of construction. The location of these photographs shall be determined by OWNER.

5. Take a minimum of 50 photos of the post-construction site and the property adjacent to the perimeter of the site. Particular emphasis shall be directed to structures both inside and outside the plant boundary, or as indicated by OWNER.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 33 03-14
Submittal Procedures
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 33 03.13-1
O&M Manual Review Checklist
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

O&M MANUAL REVIEW CHECKLIST

SUBMITTAL NO. DATED
SPEC. SECTION. REVIEW DATE

SUBJECT REVIEWER
EQUIP. ITEM SUPPLIER

MANUFACTURER

ACCEPTABLE PROJECT TITLE:

UNACCEPTABLE PROJECT NO. 23-056

ACCEPTABLE?

DISPOSITION YES NO NA COMMENTS

HARD-COPY O&M MANUALS
▪ Minimum five (5) copies ........................................... ▪ Three-ring binder with hard-back cover...................... ▪ Cover Label and Title Page (Cover/Title Page):

Project title and Project number .............................

Specification section .............................................

System/Equipment names .....................................

Facility ................................................................

Equipment number ............................................... ▪ Typed table of contents ............................................ ▪ Heavy section dividers w/numbered plastic index tabs . ▪ Sections parallel equipment specifications .................. ▪ Pages punched for 3 ring binder (punching does not
obliterate data) ....................................................... ▪ Info larger than 8-1/2”x11” folded showing title block, or included in binder pockets .................................... ▪ Multiple volumes labeled “Vol. 1”, “Vol. 2”, etc. ........... ▪ Table of contents for entire set in each binder .............

ELECTRONIC O&M MANUALS
▪ Minimum two (2) copies on USB Flash Drive ............... ▪ Full version of O&M manual in PDF format .................. ▪ PDF “Bookmarks” to label each section of manual ....... ▪ Separate text and drawing files used to create PDF

01 33 03.13-2
O&M Manual Review Checklist
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

ACCEPTABLE?

DISPOSITION YES NO NA COMMENTS
O&M manual ........................................................... ▪ Index on flash drive as separate file titled “index” ....... ▪ Flash drive labeled with submittal number ..................

TECHNICAL CONTENT
▪ Equipment Summary Form (See example of required
format, Figure 2-1, 2 pages, end of this Section)
▪ Diagrams and illustrations, including pump curves ...... ▪ Detailed description of function of principal
components ............................................................ ▪ Performance and nameplate data .............................. ▪ Installation instructions ............................................ ▪ Starting procedure .................................................. ▪ Proper adjustment procedure .................................... ▪ Test procedures ...................................................... ▪ Operating procedure (Normal operation and all other
operating modes) .................................................... ▪ Shutdown instructions, including emergency shutdown
▪ Emergency operating instructions & troubleshooting .... ▪ Safety instructions and precautions ........................... ▪ Maintenance procedures and instructions,
preventative, reactive and overhaul ........................... ▪ Troubleshooting and corrective maintenance
procedures
▪ Lubrication instructions and information .................... ▪ List of electrical relay settings and control and alarm contact settings ...................................................... ▪ Electrical interconnection wiring diagrams, including control and lighting systems, panel wiring, control
(ladder) diagrams, logic diagrams, loop diagrams, and
interconnection diagrams ......................................... ▪ Panel layout and assembly drawings
▪ Mechanical drawings
▪ Printout of all software programs and configuration
files
▪ Parts list (with exploded view and associated cross-
references)
▪ Recommended spare parts and special tools ............... ▪ Factory and field test procedures and results
▪ Project specific warranty statement

01 33 03.13-3
O&M Manual Review Checklist
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

01 33 03.13-4
O&M Manual Review Checklist
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

01 42 03-1
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 42 03

REFERENCE STANDARDS AND ABBREVIATIONS
PART 1 - GENERAL

1.1 REFERENCE STANDARDS
A. The standards referred to, except as modified, shall have full force and effect as though printed in this Specification, and shall be the latest edition or revision thereof in effect on the bid opening date, unless a particular edition or issue is indicated. Copies of these standards are not available from the CITY.

B. The ENGINEER will furnish, upon request, information as to how copies may be obtained.

C. Abbreviations and terms, or pronouns in place of them, shall be interpreted as follows:

AAMA: Architectural Aluminum Manufacturer's Association AAN: American Association of Nurserymen
AAR: Association of American Railroads
AASHTO: American Association of State Highway and Transportation Officials, Standard Specifications
AATCC: American Association of Textile Chemists and Colorists ACI: American Concrete Institute, Standards
AFBMA: Anti-Friction Bearing Manufacturer's Association, Inc.

AGA: American Gas Association
AGC: Associated General Contractors
AGMA: American Gear Manufacturer's Association
AHAM: Association of Home Appliance Manufacturer's
AI: The Asphalt Institute
AIA: American Institute of Architects
AISC: American Institute of Steel Construction, Specification for the Design, Fabrication, and Erection of Structural Steel for Buildings, and the AISC Code of Standard Practice
AISI: American Iron and Steel Institute
AITC: American Institute of Timber Construction
AMCA: Air Moving and Conditioning Association, Standards ANS: American Nuclear Society
ANSI: American National Standards Institute
APA: American Plywood Association
API: American Petroleum Institute
APWA: American Public Works Association, Standard Specifications for Public Works Construction
ASA: Acoustical Society of America
ASAE: American Society of Agriculture Engineers
ASCE: American Society of Civil Engineers
ASHRAE: American Society of Heating, Refrigeration and Air Conditioning Engineers
ASLE: American Society of Lubricating Engineers

01 42 03-2
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

ASME: American Society of Mechanical Engineers
ASQC: American Society of Quality Control

ASSE: American Society of Sanitary Engineers
ASTM: American Society for Testing and Materials, Standards AWG: American Wire Gauge
AWPA: American Wood-Preservers' Association, Standards
AWPI: American Wood Preservers Institute
AWS: American Welding Society
AWWA: American Water Works Association, Standards
BBC: Basic Building Code, Building Officials and Code Administrators International
BHMA: Builders Hardware Manufacturer's Association
CAL/OSHA: California/Occupational Safety and Health Administration, Standards CBM: Certified Ballast Manufacturer's
CCR: California Code of Regulations
CEMA: Conveyors Equipment Manufacturer's Association
CGA: Compressed Gas Association
CISPI: Cast Iron Soil Pipe Institute, Standards
CLPCA: California Lathing and Plastering Contractors Association CLFMI: Chain Link Fence Manufacturer's Institute
CMAA: Crane Manufacturers' Association of America
CMA: Concrete Masonry Association
CORDCS: City of Roseville Design & Construction Standards CORPCS: City of Roseville Process Control Standards
CRSI: Concrete Reinforcing Steel Institute, Standards
CSS: CalTrans Standard Specifications, State of California, Department of Transportation
DCDMA: Diamond Core Drill Manufacturer's Association
DOSH: Division of Occupational Safety and Health, State of California, Department of Industrial Relations
EIA: Electronic Industries Association
ETL: Electrical Test Laboratories
FED/OSHA: Federal Occupational Safety and Health Administration, Standards FM: Factory Mutual
ICBO: International Conference of Building Officials
ICEA: Insulated Cable Engineers Association
IEEE: Institute of Electrical and Electronic Engineers
IES: Illuminating Engineering Society
IME: Institute of Makers of Explosives
IP: Institute of Petroleum (London)
IPC: Institute of Printed Circuits
IPCEA: Insulated Power Cable Engineers Association
ISA: Instrument Society of America
ISO: International Organization of Standardization
ITE: Institute of Traffic Engineers
MBMA: Metal Building Manufacturer's Association
MPTA: Mechanical Power Transmission of Association
MTI: Marine Testing Institute

01 42 03-3
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

MSS: Manufacturers Standardization Society
NAAM: National Association of Architectural Metal Manufacturers NACE: National Association of Corrosion Engineers, Standards NBS: National Bureau of Standards
NCCLS: National Committee for Clinical Laboratory Standards NEC: National Electric Code
NEMA: National Electrical Manufacturers' Association, Standards NFPA: National Fire Protection Association
NFPA: National Forest Products Association
NGLI: National Lubricating Grease Institute
NMA: National Microfilm Association
NWMA: National Woodwork Manufacturers Association
OSHA: Occupational Safety and Health Administration
PCA: Portland Cement Association
PCI: Prestressed Concrete Institute
RIS: Redwood Inspection Service, Standard Specifications RVIA: Recreational Vehicle Industry Association
RWMA: Resistance Welder Manufacturer's Association
SAE: Society of Automotive Engineers
SAMA: Scientific Apparatus Makers Association
SDI: Steel Door Institute
SIS: Swedish Standards Association
SMA: Screen Manufacturer's Association
SMACNA: Sheet Metal and Air Conditioning Contractors National Association SPR: Simplified Practice Recommendation
SSBC: Southern Standard Building Code, Southern Building Code Congress SSPC: Steel Structures Painting Council, Specifications SSPWC: Standard Specifications for Public Works Construction TAPPI: Technical Association of the Pulp and Paper Industry TFI: The Fertilizer Institute
UBC: Uniform Building Code of the International Conference of Building Officials
UPC: Uniform Plumbing Code
UL: Underwriters Laboratories
WCLA: West Coast Lumbermen's Association, Standard Grading and Dressing Rules
WCLIB: West Coast Lumber Inspection Bureau
WCRSI: Western Concrete Reinforcing Steel Institute
WIC: Woodwork Institute of California
WRI: Wire Reinforcement Institute, Inc.

WWPA: Western Wood Products Association

1.2 OTHER ABBREVIATIONS
A. Common abbreviations can be found on the contract drawings complimentary to the listed abbreviations found below. In the event of a conflict, the abbreviations on the drawings shall supersede.

B. Other common abbreviations that may be found in the Specifications are, but may not be limited to:

01 42 03-4
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

acrylonitrile butadiene ABS
styrene
alternating current a-c, AC
American wire gauge AWG
ante meridiem am
ampere A, amp
average avg

biochemical oxygen BOD
demand
brake horsepower bhp
British thermal unit Btu

Centigrade C
chlorinated polyvinyl CPVC
chloride
company Co
cubic inch cu in, in³
cubic foot cu ft, CF, ft³
cubic yard cu yd, CY, yd³
cubic feet per minute cfm, ft³/min
cubic feet per second cfs, ft³/s

decibel dB
decibels, A-weighted dBA
degree Centigrade (Celsius) °C, C
degree Fahrenheit °F, F
diameter diam, ø
direct current d-c, DC
dollars $
ductile iron DI

each ea, @
efficiency eff
elevation El., Elev
ethylene proplylene rubber EPDM
exhaust fan EF

Fahrenheit F
feet ft
feet per hour fph, ft/h
feet per minute fpm, ft/min
feet per second fps, ft/s
fiberglass reinforced FRP
plastic
figure Fig.
flange flg
foot-pound ft-lb

gallon gal
gallons per hour gph, gal/hr
gallons per minute gpm, gal/min
gallons per second gps, gal/s
gram g
ground fault current GFCI
interrupter

hand/off/automatic HOA
high density polyethylene HDPE
heating, ventilating, and HVAC
air conditioning
Hertz Hz
hour hr
horsepower hp

IFC Issued for Construction
inch in
inch-pound in-lb
input/output I/O
inside diameter ID
instrumentation and I&C
control

kilovolt kV
kilovolt-ampere kVA
kilowatt kW
kilowatt-hour kWhr

length L
length to least radius L/r
of gyration
light emitting diode LED
linear lin
linear foot lin ft, LF
liter l

manhole MH
maximum max
mean sea level MSL
mercury Hg
miles per hour mph
milli-amp mA
milliampere DC mAdc
milligram mg
milligrams per liter mg/l
milliliter ml
millimeter mm
million gallon mil
million gallons per day mgd
minimum min
motor control center MCC

01 42 03-5
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

net positive suction
head available NPSHA
net positive suction
head required NPSHR
number No., #
National Pipe Thread NPT

Operation and Maintenance O&M
ounce oz
outside diameter OD

parts per million ppm
post meridiem pm
plus or minus +/-, ±
polytetrafluorethylene PTFE
polyvinyl chloride PVC
pound lb
pounds per square foot psf, lb/ft²
pounds per square inch psi, lb/in²
pounds per square inch
absolute psia
pounds per square inch
gage psig
Process and Instrumentation
Diagrams P&ID

random access memory RAM
reinforced concrete pipe RCP
reinforced concrete cylinder
pipe RCCP
relative humidity RH
revolutions per minute rpm

second sec, s
specific gravity sp gr
square foot sq ft, SF, ft²
square inch sq in, in²
square yard sq yd, SY, yd²
stainless steel SS
standard std
standard cubic feet
per minute scfm
symmetrical sym.

total dynamic head tdh
totally-enclosed, fan-
cooled TEFC
totally-enclosed, non-
ventilated TENV
twisted shielded TWSH

ultraviolet UV
United States US, USA

variable frequency drive VFD, AFD
volt V
volts alternating current VAC
volts direct current VDC

water to cement W/C, wc
water column W.C.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 42 03-6
Reference Standards and Abbreviations
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 45 03-1
Quality Control
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 45 03

QUALITY CONTROL
PART 1 - GENERAL

1.1 OBSERVATION AND SUPERVISION
A. The ENGINEER or ENGINEER’s appointed representative will review the Work and the CONTRACTOR shall provide facilities and access to the Work at all times as required to facilitate this review.

B. Responsibility:

1. The CONTRACTOR shall be solely responsible to supervise and direct the entire Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to complete the Work in accordance with the Contract Documents.

2. The CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences, quality control, and procedures of construction and safety precautions and programs incidental thereto.

3. The foregoing includes work performed by the CONTRACTOR's Subcontractors.

4. The CONTRACTOR shall be responsible to see that the finished Work complies accurately with the Contract Documents.

5. CONTRACTOR shall be responsible for maintaining a complete hardcopy set of all project documents at the site at all times. Project documents shall include but are not limited to all drawings, specifications, submittals, requests for information (RFI), requests for change (RFC), change orders, and up to date project record drawings.

6. Project documents as described above shall be onsite and available for CITY or ENGINEER review at all times. Failure to maintain or make project documents available will result in the stoppage of work. Schedule and cost changes resulting from stoppage of work are the responsibility of the CONTRACTOR.

C. Superintendent:

1. The CONTRACTOR shall designate in writing and submit for ENGINEER’s approval a technically qualified, English -speaking superintendent, who shall be onsite and responsible for the work, and who shall not be replaced without written acceptance of the ENGINEER.

2. The superintendent shall be the CONTRACTOR's representative at the job site and shall have authority to act on behalf of the CONTRACTOR.

3. All communications given to the superintendent shall be as binding as if given to the CONTRACTOR.

4. The CONTRACTOR's superintendent shall be present at the site of the Work at all times while work is in progress. Failure to observe this requirement shall be considered as suspension of the Work by the CONTRACTOR until such time as such superintendent is again present at the site.

5. CONTRACTOR’s superintendent shall be responsible for maintaining a complete hardcopy set of all project documents.

01 45 03-2
Quality Control
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.2 RESPONSIBILITY
A. The CONTRACTOR is responsible for conducting all testing and inspection specifically required by the Specifications and otherwise necessary to ensure compliance with the Contract Documents.

1. Approval of Testing Laboratories and Geotechnical Consultants:
a. All laboratory work under this contract shall be performed by a laboratory approved by the ENGINEER, whether the laboratory is employed by the CONTRACTOR, or is owned and operated by the CONTRACTOR. b. The basis of approval includes the following:
1) Testing laboratories performing work in connection with concrete, steel, and bituminous materials shall comply with ASTM E329 and ASTM D3666, respectively.
2) Testing laboratories performing work not in connection with concrete, steel, bituminous materials, soils and non -destructive testing shall comply with ASTM E548.

B. The ENGINEER may conduct periodic independent testing and inspection to verify compliance with the Contract Documents.

C. Retesting:

1. The CITY reserves the right to back -charge the CONTRACTOR for retesting of deficient or defective work or products upon written notification.

2. Compensation for retesting on behalf of the CITY will be made through deductions from the Progress Payments.

D. The CONTRACTOR is responsible for correcting all defective work discovered prior to final acceptance of the Contract, despite the failure of the Inspector(s) to discover it.

1.3 TESTS AND INSPECTIONS
A. The CONTRACTOR shall be responsible for scheduling all inspections and tests required.

1. The ENGINEER shall be given a minimum 48 business hours notice prior to any inspections or tests.

B. With the exception of the special inspections noted above to be paid for by the CITY; the CONTRACTOR shall pay for all tests, inspections and special inspections including, but not limited to:

1. Standard inspections and tests necessary to comply with laws, ordinances, rules, regulations and orders of public authorities pursuant to General Conditions.

2. Concrete and CLSM compressive strength tests for trial batch mix designs.

3. Tests of materials, inspections, and certifications required by the Specifications.

4. Testing, adjusting, and balancing of equipment and systems required by the Specifications.

5. One tension and elongation test for each 5 tons of steel or fractional part thereof for each size will be required, unless the steel can be identified by heat or melt numbers and is accompanied by mill analysis and test reports. Commercial stock may be used, subject to approval of the ENGINEER.

6. Any testing performed by the CONTRACTOR for their own quality control.

7. All compaction testing, moisture testing, field testing of CLSM for backfill placement, geotechnical observations, and all certifications necessary to comply with the specifications.

01 45 03-3
Quality Control
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

8. Retests or re-inspections by the CITY, if required, and tests or inspections required due to CONTRACTOR error or lack of required identifications of material.

9. Any and all water used by the CONTRACTOR in any testing.

C. The CONTRACTOR shall be responsible for scheduling all tests and inspections pertaining to soils which includes all items covered by 31 05 03 Earthwork. CONTRACTOR shall hire a third party accredited laboratory and geotechnical consultant for approval by CITY a minimum of 30 days in advance of using the laboratory or geotechnical consultant.

D. Two copies of the agency or laboratory report of each test or inspection shall be provided to the ENGINEER. All tests of materials shall be made in accordance with the commonly recognized standards of national technical organizations, and such other special methods and tests as are prescribed in the Contract Documents. Hardcopies of soils testing daily reports shall be provided to the ENGINEER before close of business the day tests are completed.

E. Purchase Orders:

1. One copy of each of the CONTRACTOR's purchase orders for materials forming a portion of the work shall be furnished to the ENGINEER, if requested.

2. Each such purchase order shall contain a statement that the materials included in the order are subject to inspection by the CITY.

3. Materials purchased locally will be inspected at the point of manufacture or supply, and materials supplied from points more than 50 miles from the job site will be inspected upon arrival at the job, except when other inspection requirements are provided for specific materials in other Sections of this Specification.

F. Samples:

1. The CONTRACTOR shall furnish samples of materials as are required by the ENGINEER, without charge.

2. No material shall be used until the ENGINEER has had the opportunity to test or examine such materials.

3. Samples will be secured and tested whenever necessary to determine the quality of the material.

4. Samples and test specimens prepared at the job site, such as concrete test cylinders, shall be taken or prepared by the ENGINEER in the presence and with the assistance of the CONTRACTOR.

1.4 AUTHORITY AND DUTIES OF INSPECTOR
A. Inspectors employed by the CITY shall be authorized to inspect all work done and materials and equipment furnished to complement the CONTRACTOR furnished independent inspector.

1. Such inspection may extend to all or any part of the Work, and to the preparation, fabrication, or manufacture of the materials and equipment to be used.

2. The Inspector will not alter or waive the provisions of the Contract Documents.

3. The Inspector will keep the ENGINEER informed as to the progress of the work and the manner in which it is being done.

4. The Inspector will call the CONTRACTOR's attention to nonconformance with the Contract Documents that the Inspector may have observed.

5. The Inspector will not be responsible for the adequacy or correctness of the CONTRACTOR's means, methods, techniques, sequences, or procedures for construction.

01 45 03-4
Quality Control
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

6. The Inspector will not approve or accept any portion of the work, issue instructions contrary to the Contract Documents, or act as foreman for the CONTRACTOR.

7. The Inspector may reject defective materials, equipment, or work when it is not in compliance with the Contract Documents.

8. The Inspector will not be responsible for:
a. The CONTRACTOR's quality control program.
b. The CONTRACTOR's safety program.
c. Coordinating the work or activities of the CONTRACTOR or their Subcontractor.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 51 03-1
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 51 03

TEMPORARY CONSTRUCTION FACILITIES AND UTILITIES
PART 1 - GENERAL

1.1 CONTRACTOR'S STAGING AREA AND WORK ACCESS PLAN
A. 1800 Booth Road is available to the Contractor for material storage or project office. The City can supply sewer and water connections but the Contractor will have to make arrangements for power.

B. The CONTRACTOR shall limit the location of the storage of equipment and materials to the staging area(s) designated on the Drawings and as directed by the ENGINEER.

C. The CONTRACTOR shall make their own arrangements for additional space that may be required and shall bear all associated costs.

D. Work Access Plan: The CONTRACTOR shall submit a work access plan showing the planned access route for deliveries of supplies and mobilization of work force for ENGINEER's approval prior to mobilization.

E. On-Site Project Office:

1. The CONTRACTOR shall maintain near the work in progress a suitable office or other protected area in which shall be kept project copies of the Contract Documents, project progress records, project schedule, shop drawings and other relevant documents which shall be accessible to the OWNER and ENGINEER during normal working hours.

2. The CONTRACTOR shall make their own arrangements for additional space that may be required and bear all associated costs.

F. Temporary Facilities Plan:

1. The CONTRACTOR shall submit to the ENGINEER for approval, as part of the mobilization effort, the proposed plan and layout for all temporary offices, sanitary facilities, temporary construction roads, storage buildings, storage yards, temporary water service and distribution, temporary telephone and temporary power service and distribution.

2. The plan shall show all temporary fencing and gates and all proposed access to the work areas.

3. Prior to the removal of existing fence, the CONTRACTOR shall provide temporary security fencing at least equal to the existing chain link and barbed wire fencing to protect the existing facilities and structures.

G. Access Roads:

1. The CONTRACTOR shall "winterize" and maintain all access roads at all times to provide a driving surface satisfactory for 2-wheel drive low clearance vehicular traffic.

2. The roads shall be gravel surfaced, smooth, and free from humps and depressions.

3. Contractor shall perform dust control on all access roads.

4. All costs of complying with this requirement shall be included in the lump sum bid.

01 51 03-2
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.2 STORAGE - GENERAL
A. The CONTRACTOR shall provide any temporary storage required for the protection of equipment and materials as recommended by manufacturers of such materials.

1.3 STORAGE BUILDINGS
A. The CONTRACTOR shall erect or provide temporary storage buildings of the various sizes as required for the protection of mechanical and electrical equipment and materials as recommended by manufacturers of such equipment and materials.

B. The buildings shall be provided with such environmental control systems that meet recommendations of manufacturers of all equipment and materials stored in the buildings.

C. The buildings shall be of sufficient size and so arranged or partitioned to provide security for their contents and provide ready access for inspection and inventory.

D. At or near the completion of the work, and as directed by the ENGINEER, the temporary storage buildings shall be dismantled, removed from the site, and remain the property of the CONTRACTOR.

E. Combustible materials (paints, solvents, fuels, etc.) shall be safely stored and separated in accordance with the manufacturer’s requirements and in compliance with hazardous material storage requirements. CONTRACTOR shall be responsible for providing proper storage buildings for combustible materials.

1.4 STORAGE YARDS
A. The CONTRACTOR shall provide temporary storage yards as required for the storage of materials that are not subject to damage by weather conditions.

B. Materials such as pipe, reinforcing and structural steel, shall be stored on pallets or racks, off the ground, and stored in a manner to allow ready access for inspection and inventory.

C. Temporary gravel surfacing of the storage yards shall meet with the approval of the ENGINEER.

1.5 PARKING AREAS
A. Control vehicular parking to preclude interference with public traffic or parking, access by emergency vehicles, CITY’s operations, or construction operations.

1.6 VEHICULAR TRAFFIC
A. Comply with Laws and Regulations regarding closing or restricting use of public streets or highways. No public or private road shall be closed, except by written permission of proper authority. Assure the least possible obstruction to traffic and normal commercial pursuits.

01 51 03-3
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Conduct the Work to interfere as little as possible with public travel, whether vehicular or pedestrian.

C. Whenever it is necessary to cross, close, or obstruct roads, driveways, and walks, whether public or private, provide and maintain suitable and safe bridges, detours, or other temporary expedients for accommodation of public and private travel.

1.7 DELIVERY-STORAGE-HANDLING
A. General:

1. The CONTRACTOR shall deliver, handle, and store materials and equipment in accordance with supplier's written recommendations and by methods and means which will prevent damage, deterioration, and loss including theft.

2. Delivery schedules shall be controlled to minimize long-term storage at the site and overcrowding of construction spaces.

3. In particular, the CONTRACTOR shall provide delivery/installation coordination to ensure minimum holding or storage for material or equipment recognized to be flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other sources of loss.

B. Transportation and Handling:

1. Materials and equipment shall be transported by methods to avoid damage and shall be delivered in dry, undamaged condition in supplier's unopened containers or packaging.

2. The CONTRACTOR shall provide equipment and personnel to handle the materials, and equipment by methods that will prevent soiling and damage.

3. The CONTRACTOR shall provide additional protection during handling to prevent marring and otherwise damaging packaging, and surrounding surfaces.

C. Storage and Protection:

1. Materials and equipment shall be stored in accordance with supplier's written instructions, with seals and labels intact and legible. Exposed metal surfaces of valves, fittings and similar materials shall be coated with grease in accordance with manufacturer's recommendations to prevent corrosion. Sensitive materials and equipment shall be stored in weather-tight enclosures and temperature and humidity ranges shall be maintained within tolerances required by supplier's written instructions.

2. For exterior storage of fabricated materials, they shall be placed on sloped support above ground. Materials or equipment subject to deterioration shall be covered with impervious sheet covering; ventilation shall be provided to avoid condensation.

3. Loose granular materials shall be stored on solid surfaces in a well-drained area and shall be prevented from mixing with foreign matter.

4. Inspection:
a. Storage shall be arranged to provide access for inspection. b. The CONTRACTOR shall periodically inspect to assure materials and equipment are undamaged and are maintained under required conditions.

5. Storage shall be arranged in a manner to provide access for maintenance of stored items.

01 51 03-4
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.8 PROJECT SECURITY
A. The CONTRACTOR shall make adequate provision for the protection of the work area against fire, theft and vandalism, and for the protection of the public and CITY personnel against exposure to injury, and for the security of any off-site storage areas.

B. All costs for this protection shall be included within the CONTRACTOR's bid.

1.9 TEMPORARY UTILITIES
A. The CONTRACTOR shall provide and pay for all necessary temporary telephones, fuel, power, potable water, sanitary, and proper toilet accommodations. CONTRACTOR shall not use CITY-owned utilities except for potable water. CITY will work with CONTRACTOR to provide potable water free of charge. The CONTRACTOR, however, shall be required to furnish and lay such pipe and/or provide such other means as may be necessary and/or incidental to the delivery of water at such point or points of use and at such pressure as may be necessary. No additional compensation will be made therefore. Contractor shall not use quick acting valves which might create surges.

B. The temporary facilities to be provided by the CONTRACTOR as described above shall conform to all requirements in regard to operation, safety, and fire hazards of State and local authorities and of Underwriters.

C. CONTRACTOR shall return the site and facilities to their original "pre -construction" condition, unless otherwise specified in the Contract Documents, at the completion of the project.

1.10 SOUND CONTROL
A. The CONTRACTOR shall comply with all local sound control and noise level rules, regulations and ordinances which apply to any work performed pursuant to the contract.

B. Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer, so as to produce a maximum noise level of 85 dBA at 5 feet.

C. No internal combustion engine shall be operated on the project without said muffler.

D. Special Precautions for Inhabited Areas:

1. In inhabited areas, particularly residential, operations shall be performed in a manner to minimize unnecessary noise generation.

2. In residential areas, special measures shall be taken to suppress noise generated by repair and service activities during the night hours.

1.11 DUST/AIR POLLUTION CONTROL
A. The CONTRACTOR shall comply with all Federal, State and local regulatory requirements with respect to air pollution prevention.

B. The CONTRACTOR shall take whatever steps, procedures, or means as are required to prevent dust conditions being caused by operations in connection with the execution of

01 51 03-5
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

the Work; and on any road which the CONTRACTOR or any of their Subcontractors are using, excavation or fill areas, demolition operations, or other activities.

C. Control shall be by sprinkling, use of dust palliatives, modification of operations, or any other means acceptable to agencies having jurisdiction.

D. Damage to personal property, etc., resulting from the CONTRACTOR's construction operations shall be borne by the CONTRACTOR at no cost to the CITY.

E. The CONTRACTOR shall keep the streets and work area clean at all times by means of mechanical sweepers or hand sweeping. Water will be used for dust control only, and not for cleaning streets.

F. Burning of waste, rubbish, or other debris will not be permitted on or adjacent to site.

1.12 WASTE DISPOSAL
A. The CONTRACTOR shall dispose of surplus materials, waste products, and debris and shall make necessary arrangements for such disposal. The CONTRACTOR shall obtain written permission from property owner prior to disposing surplus materials, waste products, or debris on private property.

B. All waste disposal shall be done in accordance with applicable laws and regulations.

C. Landfill Disposal:

1. If the CONTRACTOR proposes to dispose of construction debris, trench spoils, excavation spoils, etc., at a landfill, the CONTRACTOR shall be responsible to provide and pay for all permits and analyses required by the landfill.

2. If the analyses determine that the material is hazardous, then an equitable adjustment of the Contract for the cost of hazardous waste disposal will be made in accordance with the General Conditions, and the following:
a. Time extension or contract costs will not be granted for delays that could have been avoided by the CONTRACTOR redirecting their forces and equipment to perform other work on the contract.

D. Ditches, washes, or drainageways shall not be filled.

E. Disposal operations shall not create unsightly or unsanitary nuisances.

F. The CONTRACTOR shall maintain the disposal site in a condition of good appearance and safety during the construction period.

G. Prior to final acceptance of the work, the CONTRACTOR shall have completed the leveling and cleanup of the disposal site.

1.13 CLEAN UP
A. Throughout the period of construction, the CONTRACTOR shall keep the work site free and clean of all rubbish and debris, and shall promptly remove from the site, or from property adjacent to the site of the work, all unused and rejected materials, surplus earth, concrete, plaster, and debris.

01 51 03-6
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Upon completion of the work, and prior to final acceptance, the CONTRACTOR shall remove from the vicinity of the work all plant, surplus material, and equipment belonging to the CONTRACTOR or used under their direction during construction.

1.14 TEMPORARY ENCLOSURES
A. When sandblasting, spray painting, spraying of insulation, or other activities inconveniencing or dangerous to property or the health of employees, the public or construction workers, are in progress, the area of activity shall be enclosed adequately to contain the dust, over spray, or other hazard.

B. In the event there are no permanent enclosures of the area, or such enclosures are incomplete or inadequate, the CONTRACTOR shall provide suitable temporary enclosures as required by the ENGINEER to meet field conditions in accordance with the recommendations of the owner -furnished equipment supplier (if applicable) and the CONTRACTOR's equipment supplier requirements.

C. Said temporary or permanent enclosures shall be adequately ventilated to ensure the safety of the workers.

1.15 DRAINAGE
A. The CONTRACTOR shall take all necessary actions as required to meet discharge requirements of the State of California and other pertinent local ordinances and regulations pertaining to dewatering and/or site drainage discharged into storm drains and creeks. This may include, but may not be limited to, the use of retention basins and silt basins to settle most of the solids prior to discharge.

B. In excavation, fill, and grading operations, care shall be taken to disturb the pre-existing drainage pattern as little as possible.

C. Particular care shall be taken not to direct drainage water onto private property or into streets or drainageways inadequate for the increased flow.

D. Drainage means shall be provided to protect the work.

1.16 TEMPORARY LIGHTING
A. The CONTRACTOR shall provide temporary lighting in all work areas sufficient to maintain a lighting level during working hours not less than the lighting level required by OSHA standards.

1.17 CONSTRUCTION FACILITIES
A. Construction hoists, elevators, scaffolds, stages, shoring, and similar temporary facilities shall be of ample size and capacity to adequately support and move the loads to which they will be subjected. Railings, enclosures, safety devices, and controls required by law or for adequate protection of life and property shall be provided.

B. Temporary supports shall be designed with an adequate safety factor to assure adequate load bearing capability. Whenever required by safety regulations, the CONTRACTOR shall submit design calculations for staging and shoring prior to application of loads.

01 51 03-7
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.18 REMOVAL OF TEMPORARY FACILITIES AND UTILITIES
A. At such time or times as any temporary construction facilities and utilities are no longer required for the Work, the CONTRACTOR shall notify the ENGINEER of their intent and schedule for removal of the temporary facilities and utilities, and obtain the ENGINEER's approval before removing the same.

B. As approved, the CONTRACTOR shall remove the temporary facilities and utilities from the site as CONTRACTOR’s property and leave the site in such condition as specified, as directed by the ENGINEER, and/or as shown on the Drawings.

C. In unfinished areas, such as planted medians, the condition of the site shall be left in a condition that will restore original drainage, evenly graded, seeded or planted as necessary, and left with an appearance equal to, or better than original.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 51 03-8
Temporary Construction Facilities and Utilities
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 57 03-1
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 57 03

SEWER BYPASS PUMPING
PART 1 - GENERAL

1.1 GENERAL
A. Scope: This Section covers temporary bypass pumping requirements , required of the CONTRACTOR, that shall apply during construction, including but not limited to furnishing all materials, labor, equipment, power, maintenance, etc. to implement a temporary pumping system for the purpose of diverting the existing sanitary sewer flow around the work area for the duration necessary to complete the work.

B. The CONTRACTOR shall inform all Subcontractors and manufacturers of the requirements herein and include the required services in their costs for the work specified in these Contract Documents.

C. The design, installation and successful operation of the temporary pumping system shall be the CONTRACTOR's responsibility. The bypass system shall meet the requirements of all codes and regulatory agencies having jurisdiction.

D. The bypass system shall be designed, installed and operated by the CONTRACTOR to prevent any and all leakage or discharge of sewage to the environment. If a sewage leak or discharge occurs, CONTRACTOR shall be solely responsible for the remedy of the leak, containment and clean -up of the discharge, as well as responsible for any direct or consequential damages, including fines, that are associated with the leak.

E. Scheduling:

1. Temporary bypass pumping is requisite to satisfactory completion of the Contract and, therefore, shall be completed within the contract time.

2. All temporary bypass pumping activities shall be realistically allowed for and shown on the CONTRACTOR's Construction Schedule.

3. Schedule and perform work in a manner that does not cause or contribute to sanitary sewer overflows, releases or spills of sewage from surrounding collection system or bypass system.

4. All temporary bypass pumping shall be scheduled in conformance with the restrictions specified in Section 01 14 03, Special Project Constraints.

1.2 SUBMITTALS
A. Temporary Bypass Pumping Plan:

1. Not less than 1 month prior to CONTRACTOR’s intended start of temporary bypass pumping, the CONTRACTOR shall submit a detailed Temporary Bypass Pumping Plan for each of the pipeline segment replacements and pump station improvements that require bypass pumping per the Drawings to the ENGINEER for review.

01 57 03-2
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Temporary Bypass Pumping shall not commence without written approval of the plan from the ENGINEER.

3. The Temporary Bypass Pumping Plan (for each separate area of work) shall include:
a. Detailed description of the Temporary Bypass Pumping Plan, including a drawing identifying suction manholes, suction piping, high-level alarm float switch locations/elevations, pumps, discharge piping, and discharge connection details. b. Description of sewer plugging method and types and location of plugs. c. Number, size, material, location and method of installation of suction piping. d. Number, size, material, location and method of installation of discharge piping e. Bypass pump information, including make, model, size, curves with ope rating range clearly delineated , number of each size to be on site and power requirements.
f. Description of backup pump, power and piping equipment. g. Calculations for static lift, flow velocity, friction and fittings losses. h. Power generator size, location, fueling plan.
i. Method of protecting discharge manholes or str uctures from erosion and damage.
j. Thrust and restraint block sizes and locations.
k. Any temporary pipe supports and anchoring required.
l. Method of crossing streets while maintaining traffic flow requirements. m. Schedule for installation and maintenance of bypass pumps and piping. n. Startup, leakage and pressure testing plan:
1) Testing shall be conducted using clean water
2) ENGINEER shall be notified a minimum of 24 hours prior to testing. o. Identification of any coordination required with the CITY’s staff. p. Plan for monitoring upstream manholes for backup impacts. q. Procedures for setup and breakdown of pumping operations. r. System Monitoring Plan
s. Emergency Response Procedures:
1) Provide detailed emergency procedures to be followed in event of pump failures, sewer overflows, service backups, and sewage spillage. 2) Maintain copy of emergency procedures on site for duration of project. 3) Include emergency contact numbers for CITY and CONTRACTOR personnel. 4) Provide emergency contact hierarchy for day and night operations. 5) Provide spill reporting procedures.
6) List all containment and clean up equipment and supplies to be on site and available at all times.
7) Provide detailed procedures for spill containment and cleanup. t. Proposed use of vactor trucks
u. Valve/piping system plan for removable bypass piping sections PART 2 - PRODUCTS

2.1 MATERIALS
A. All bypass piping shall be fusion bonded High Density Polyethylene.

01 57 03-3
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Discharge piping diameter: velocity not to exceed 5 feet per second C. Suction piping diameter: Determined according to pump size, flow calculations, and manhole depth following manufacturer’s specifications and recommendations.

D. High-Density Polyethylene (HDPE) Pipe:

1. High density solid wall and following ASTM F714 Polyethylene (PE) Plastic Pipe (SDR- DR) based on Outside Diameter, ASTM D1248 and ASTM D3550.

2. Homogenous throughout, free of visible cracks, discoloration, pitting, varying wall thickness, holes, foreign material, blisters, or other deleterious faults.

3. Defective areas of pipe: Cut out and joint fused as stated herein.

4. Assembled and joined at site using couplings, flanges or butt -fusion method to provide leak proof joint. Follow manufacturer’s instructions and ASTM D 2657.

Threaded or solvent joints and connections will not be permitted. a. Fusing: By personnel certified as fusion technicians by manufacturer of HDP E pipe and/or fusing equipment.
b. Butt-fused joint: True alignment and uniform roll-back beads resulting from use of proper temperature and pressure.
c. Allow adequate cooling time before removal of pressure. d. Watertight and have tensile strength equal to that of pipe.

5. Flexible Hoses and Associated Couplings and Connectors:
a. Abrasion resistant.
b. Suitable for intended service.
c. Rated for external and internal loads anticipated, including test pressure. 1) External loading design: Incorporate anticipated traffic loadings, in cluding traffic impact loading.
d. When subject to traffic loading, compose system, s uch as traffic ramps or covers.
1) Install system and maintain HS-20-44 loading requirements while in use or as directed by the ENGINEER.

E. Valves and Fittings:

1. Provide all valves and fittings necessary to operate the Bypass Pumping System and to enable quick adjustments or modifications to the system, such as pump switchout.

2. Selection shall be appropriate for raw municipal wastewater and shall be based on flow calculations and system operating pressures.

3. At minimum, the following valves shall be provided:
a. Check valves on the discharge of each pump
b. Isolation valves that enable either the duty or the standby pump to be brought online or taken offline without delay.

4. Cam Lock or quick release fittings shall not be allowed.

5. Where a removable bypass piping section is proposed, CONTRACTOR shall provide valve/piping system to allow for removal of bypass piping section in intersection of roadway. CONTRACTOR shall submit a plan for the valve/piping system and gain approval from ENGINEER/CITY prior to implementation.

F. Plugs: Selected and installed according to size of line to be plugged, pipe and manhole configurations, and based on specific site.

01 57 03-4
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Plugs shall be inspected for defects prior to use

2. Mitigation measures to secure plugs and prevent flow downstream

3. Provide redundant plugs available in the event a plug fails G. Aluminum irrigation piping or glued PVC piping will not be permitted.

H. Discharge hose will only be allowed in short sections when approved by ENGINEER.

2.2 EQUIPMENT
A. Pumps: Provide fully automatic self -priming units that do not require foot -valves or vacuum pumps for priming.

1. Leak proof design.

2. Capable of passing minimum 2” diameter solids.

3. Pumps shall have minimum 4” suction and discharge connections.

4. Electric or diesel powe red. CONTRACTOR shall provide generator if electric powered, no electric service shall be assumed to be available at the work sites.

5. Able to run dry without damage.

6. Provide start/stop controls for each pump, complete with visual and auditory alarming systems.

7. Provide a high -level alarm float switch near the suction of the bypass p umping system that when activated will indicate the pumping system is not keeping pace with influent sewage flows.

8. Provide noise attenuation system for pumps producing noise louder than 60 dBA at 30 feet from pump. Provide similar noise attenuation for all generators used.

9. Bypass System Capacity:
a. Bypass system shall have sufficient capacity to pump the peak anticipated sewer flows at each bypass point. Peak anticipated sewer flows at each bypass point are as follows:
1) Schedule A work:
a) Hickory Street: 160 gpm; Existing 8” VCP
b) Atkinson Street: 600 gpm; Existing 10” VCP
c) Church Street: 1420 gpm; Existing 12” VCP

2) Schedule B work: 350 gpm maximum if work is done prior to PS 26 pump installation; 900 gpm maximum if work is done after PS 26 pump installation.
a) Work Zone 1: Existing 10” line (parallel to Sierra College Boulevard) b) Work Zone 2: Existing 8” line (parallel to Sierra College Boulevard) c) Work Zone 3: Existing 8” line (intersection of East Roseville Parkway and Sierra College Boulevard)
d) Work Zone 4: Existing 10” line (parallel to Sierra College Boulevard) e) Work Zone 5: Existing 10” line (parallel to Sierra College Boulevard)

10. Standby Equipment:
a. Provide a minimum of one full capacity standby pump for each size maintained on site. A minimum of one standby pump shall be provided for up to two duty pumps and a minimum of two standby pumps shall be provided for three or more duty pumps.
b. Standby pump shall be maintained online, isolated from duty pump by a valve.

01 57 03-5
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. A sufficient number of valves, tees, elbows, connections, tools, piping, and other parts of the system hardware for the different pipe sizes as needed, shall be on site and readily available to ensure immediate repair or modifications of any part of the system as necessary.
d. If the pumps are electrical, a standby generator shall be provided on site at all times.

PART 3 - EXECUTION

3.1 GENERAL
A. Raw sewage is prohibited from entering any drain inlets, storm drain manholes, or other outlets that flow into a stream, creek, river, or other waterway. Raw sewage shall not leave the sewer collection system.

B. Bypass pumping and/or diversion shall be provided as required for acceptable completion of the sewer mainline replacement via open cut and pipe bursting methods as well as the improvements to City of Roseville Pump Station #26.

C. Bypass pumping shall be done in such a manner as not to damage public or private property or create a nuisance or health menace.

D. Bypass pumping shall adhere to CITY easement boundaries and encroachment permits.

E. The CONTRACTOR shall be liable for all cleanup, damage, and/or resultant fines in the event of a sewage spill. After the Work is completed, flow shall be returned to the rehabilitated sewer and all temporary equipment removed.

3.2 INSTALLATION AND REMOVAL
A. Provisions and requirements must be approved by ENGINEER before implementation.

B. CITY and ENGINEER shall be notified of the schedule and present during installation of Bypass Pumping system.

C. Access manholes or make connections to existing sewer and construct temporary bypass pumping structures at access location s indicated on ENGINEER approved Drawings.

D. Plugging or blocking of sewage flows shall incorporate a primary and secondary plugging device. When plugging or blocking is no longer needed for performance and acceptance of work, remove in a manner that permits the sewage flow to slowly return to normal without surge, to prevent surcharging or causing other major disturbances downstream.

E. When working inside manhole s, follow all OSHA, Local, State and Federal safety requirements. Take required measures to protect workforce against sewer gases and/or combustible or oxygen-deficient atmosphere.

01 57 03-6
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

F. Installation, Operation and Removal of Bypass Pipelines:

1. When bypass pipeline crosses local streets and private driveways, place in roadway ramps.

2. When roadway ramps cannot be used, place bypass in trenches and cover with temporary pavement as approved by ENGINEER.

3. Prior to any excavation required, CONTRACTOR shall locate all utilities in the proposed area and notify the ENGINEER of any potential conflicts.

4. During bypass pumping operation, protect sewer lines from damage inflicted by equipment.

5. Upon completion of bypass pumping operations, and after the receipt of written permission from ENGINEER, remove piping, restore property to pre -construction condition and restore pavement. Bypass pipeline shall be flushed with potable water prior to removal to prevent spillage of sewage to the environment.

3.3 INITIAL TESTING
A. Pressure testing of the bypass pipeline shall be conducted and witnessed by the ENGINEER prior to initial testing. Pressure testing shall be with potable water. The provision of potable water for testing shall be the responsibility of the CONTRACTOR.

B. An initial test of the complete bypass pumping system shall be conducted in the presence of the ENGINEER, using potable water. The provision of potable water for testing shall be the responsibility of the CONTRACTOR.

C. Pumps shall be shown to be capable of self -priming after a loss of prime, with a minimum reprime lift greater than the suction lift that will be required during normal operation.

D. Suction pipe configuration for reprime test shall incorporate a 2 feet minimum horizontal run, a 90o elbow and vertical run at the minimum specified lift. Pipe size shall be equal to the pump suction diameter.

E. Repeatability of performance shall be demonstrated by testing three consecutive reprime cycles. Full pump capacity (flow) shall be achieved within five minutes during each cycle. No water should be discharged from the priming system to the environment during priming or operation.

3.4 OPERATION OF THE BYPASS SYSTEM
A. CONTRACTOR shall have sole responsibility for the operation of the bypass system.

Neither CITY nor ENGINEER personnel shall be involved in bypass system operation in any way.

1. System monitoring:
a. CONTRACTOR shall supply personnel dedicated to the monitoring and maintenance of the bypass system full time during all hours that the system is operated (24 hours per day where applicable).
b. CONTRACTOR shall be responsible for monitoring bypass pumping operations using CONTRACTOR personnel who are on site performing other functions.

Bypass pumping operations shall be monitored, including examination of the

01 57 03-7
Sewer Bypass Pumping
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

entire length of the bypass pipeline at least once every 2 hours during operating hours to confirm that all systems are fully functional, not leaking, and in good condition. CONTRACTOR shall repair any leaks discovered immediately.

3.5 USE OF VACTOR TRUCKS
A. CONTRACTOR may use sewer plugging and vactor trucks to bypass low flows as indicated on the Drawings or proposed by the CONTRACTOR. CONTRACTOR shall confirm and estimate the peak flow rate to be pumped out to confirm pumping with a vactor truck is feasible as opposed to bypass pumping.

B. When plugging sewer lines, contractor shall regularly monitor upstream manholes for surcharging and pump out the manhole and sewer lines as frequently as required.

C. CONTRACTOR may discharge pumped flow into a nearby downstream manhole at a rate which does not cause surcharge in the downstream sewer.

+ + END OF SECTION + +

THIS PAGE IS INTENTIONALLY BLANK

01 61 03-1
General Product Requirements
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 61 03

GENERAL PRODUCT REQUIREMENTS
PART 1 - GENERAL

1.1 SCOPE
A. All products furnished and installed under this contract shall conform to the general stipulations set forth in this Section except as otherwise specified in other Sections.

1.2 COORDINATION
A. The CONTRACTOR shall coordinate all details of the products and equipment with other related parts of the Work, including verification that all structures, piping, wiring, and equipment components are compatible. The CONTRACTOR shall be responsible for all structural and other alterations in the Work required to accommodate products or equipment differing in dimensions or other characteristics from that contemplated in the Contract Drawings or Specifications.

1.3 DESIGN REQUIREMENTS
A. Where CONTRACTOR design is specified, design and installation of systems, equipment, and components, including supports and anchorage, shall be in accordance with provisions of 2019 edition of the California Building Code (CBC).

1. Basic Wind Speed: 105 mph, Exposure C.

2. Seismic:
a. SS (maximum short-term spectral response acceleration) = 0.426 b. S1 (maximum 1-second spectral response acceleration) = 0.216 c. SDS (design short-term spectral response acceleration) = 0.414 d. SD1 (design 1-second spectral response acceleration) = 0.312 e. Ie (Seismic Importance Factor) = 1.5
f. Risk Category = IV

3. Maximum Rain Intensity: 2.22-inches/hour (15 min precipitation intensity) B. Proof of Compliance:

1. Structural integrity and anchorage shall be certified by an approved calculation that demonstrates the adequacy of the anchorage system for seismic forces. This calculation may be based on principles of structural analysis and engineering mechanics, or based on similarity to approved shake-table tests.

2. The CONTRACTOR shall submit for review and approval test data or calculations certified by a Civil or Structural Engineer registered in the State of California to show compliance with the above requirements.

1.4 ENVIRONMENTAL REQUIREMENTS
A. Altitude: Provide materials and equipment suitable for installation and operation under rated conditions at 100 feet above sea level.

01 61 03-2
General Product Requirements
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Provide equipment and devices installed outdoors or in unheated enclosures capable of continuous operation within an ambient temperature range of 15 degrees F to 120 degrees F.

1.5 WORKMANSHIP AND MATERIALS
A. The CONTRACTOR shall guarantee all equipment against faulty or inadequate design, improper assembly or erection, defective workmanship or materials, and leakage, breakage, or other failure. Materials shall be suitable for service conditions.

B. All equipment shall be designed, fabricated, and assembled in accordance with recognized and acceptable engineering and shop practice. Individual parts shall be manufactured to standard sizes and gages so that repair parts, furnished at any time, can be installed in the field. Like parts of duplicate units shall be interchangeable.

Equipment shall not have been in service at any time prior to delivery, except as required by tests.

C. Except where otherwise specified, structural and miscellaneous fabricated steel used in equipment shall conform to AISC standards. All structural members shall be designed for shock or vibratory loads. Unless otherwise specified, all steel which will be submerged, all or in part, during normal operation of the equipment shall be at least 1/4 inch thick.

D. Except where otherwise specified, all metal which will be exposed to weather, submerged or otherwise exposed to moisture shall be either non -ferrous or stainless steel, as the application may require.

1.6 LUBRICATION
A. Equipment shall be adequately lubricated by systems which require attention no more frequently than weekly during continuous operation. Lubrication systems shall not require attention during startup or shutdown and shall not waste lubricants.

B. Lubricants of the type recommended by the equipment manufacturer shall be provided in sufficient quantity to fill all lubricant reservoirs and to replace all consumption during testing, startup, and operation prior to acceptance of equipment by CITY. Unless otherwise specified or permitted, the use of synthetic lubricants will not be acceptable.

C. Lubrication facilities shall be convenient and accessible. Oil drains and fill openings shall be easily accessible from the normal operating area or platform. Drains shall allow for convenient collection of waste oil in containers from the normal operating area or platform without removing the unit from its normal installed position.

1.7 ANCHOR BOLTS
A. Equipment suppliers shall furnish suitable anchor bolts for each item of equipment.

B. Anchor bolts, together with templates or setting drawings, shall be delivered sufficiently early to permit setting the anchor bolts when the structural concrete is placed.

C. Anchor bolts shall comply with Section 05 05 06, Anchors, Inserts and Dowels and, unless otherwise specified, shall have a minimum diameter of 1/2-inch.

01 61 03-3
General Product Requirements
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

D. Unless otherwise indicated or specified, anchor bolts for items of equipment mounted on baseplates shall be long enough to permit 1-1/2 inches of grout beneath the baseplate and to provide adequate anchorage into structural concrete.

1.8 SPECIAL TOOLS AND ACCESSORIES
A. Equipment requiring periodic repair and adjustment shall be furnished complete with all special tools, instruments, and accessories required for proper maintenance. Equipment requiring special devices for lifting or handling shall be furnished complete with those devices.

1.9 SHOP PAINTING
A. Surface Protection:

1. All steel and iron surfaces shall be protected by suitable paint or coatings applied in the shop.

2. Surfaces that will be inaccessible after assembly shall be protected for the life of the equipment.

3. Exposed surfaces shall be finished smooth, thoroughly cleaned, and filled as necessary to provide a smooth uniform base for painting.

4. Electric motors, speed reducers, starters, and other self -contained or enclosed components shall be shop primed or finished with a high-grade oil-resistant enamel suitable for coating in the field with an alkyd enamel.

5. Coatings shall be suitable for the environment where the equipment is installed.

B. Shop Primer:

1. Surfaces to be painted after installation shall be prepared for painting as recommended by the paint manufacturer for the intended service, and then shop painted with one or more coats of the specified primer.

2. Unless otherwise specified, the shop primer for steel and iron surfaces shall be:
a. Cook "391-N-167 Barrier Coat",
b. Koppers "No. 10 Inhibitive Primer",
c. Tnemec "37H Chem-Prime HS",
d. Valspar "13-R-28 Chromox Primer",
e. Or equal.

C. Machined, polished, and nonferrous surfaces which are not to be painted shall be coated with rust-preventive compound, Houghton "Rust Veto 344", Rust-Oleum "R-9", or equal.

1.10 PREPARATION FOR SHIPMENT
A. All equipment shall be suitably packaged to facilitate handling and protect against damage during transit and storage. All equipment shall be boxed, crated, or otherwise completely enclosed and protected during shipment, handling, and storage. All equipment shall be protected from exposure to the elements and shall be ke pt thoroughly dry at all times.

B. Painted surfaces shall be protected against impact, abrasion, discoloration, and other damage. All painted surfaces which are damaged prior to acceptance of equipment shall be repainted to the satisfaction of ENGINEER.

C. Grease and lubricating oil shall be applied to all bearings and similar items.

01 61 03-4
General Product Requirements
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

D. Each item of equipment shall be tagged or marked as identified in the delivery schedule or on the Shop Drawings. Complete packing lists and bills of material shall be included with each shipment.

1.11 STORAGE
A. Upon delivery, all equipment and material shall immediately be stored and protected until installed in the Work.

B. Pumps, motors, electrical equipment, and all equipment with antifriction or sleeve bearings shall be stored in weathertight structures maintained at a temperature above 60o F. Equipment, controls, and insulation shall be protected against moisture and water damage. All space heaters furnished in equipment shall be connected and operated continuously.

C. Equipment and materials shall not show any pitting, rust, decay, or other deleterious effects of storage when installed in the work.

1.12 INSTALLATION AND OPERATION
A. Equipment shall not be installed or operated except by, or with the guidance of, qualified personnel having the knowledge and experience necessary for proper results. When so specified, or when employees of the CONTRACTOR or their subcontractors are not qualified, such personnel shall be field representatives of the manufacturer of the equipment or materials being installed.

B. Qualified field representatives shall be provided by the equipment manufacturers as required by Section 01 75 06, Testing, Training and Startup.

C. All equipment installed under this Contract, including that furnished by CITY shall be placed into successful operation according to the written instructions of the manufacturer or the instructions of the manufacturer's field representative. All required adjustments, tests, operation checks, and other startup activity shall be provided.

D. Acceptance of work in connection with the installation of equipment furnished by others will be subject to approval of the field representative. The CONTRACTOR shall be responsible for planning, supervising, and executing the installation of work, and the approval or acceptance of ENGINEER or the field representative will not relieve the CONTRACTOR of responsibility for defective work.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 71 13-1
Mobilization
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 71 13

MOBILIZATION
PART 1 - GENERAL

1.1 GENERAL
A. Mobilization shall include the obtaining of all bonds, insurance, and licenses; moving onto the site of all plant and equipment; furnishing and erecting plants, temporary buildings, and other construction facilities; all as required for the proper performance and completion of the work.

B. Mobilization shall include but not be limited to the following principal items:

1. Moving on to the site of all CONTRACTOR's equipment.

2. Installing temporary construction power, wiring, and lighting facilities.

3. Developing construction water supply.

4. Furnishing the work access plan as specified in Section 01 51 03, Temporary Construction Facilities and Utilities.

5. Providing all on -site CONTRACTOR communication facilities, including telephones, and radio pagers and any radio communications facilities required for the CONTRACTOR to coordinate their forces.

6. Providing on-site sanitary facilities and potable water facilities as specified in Section 01 51 03, Temporary Construction Facilities and Utilities.

7. Arranging for and erection of the CONTRACTOR's work and storage yard, including site security.

8. Posting all EPA and OSHA required notices and establishment of safety programs.

9. Post all required labor and EEOE notices.

10. Have the CONTRACTOR's superintendent at the job site full time.

11. Submittal and CITY acceptance of the Construction Schedule.

12. Establishing site security, lighting, fencing, and signing.

13. Obtaining all bonds, insurance and licenses.

14. Providing an organization chart of the project and for the CONTRACTOR's firm. The project chart shall include the name, title and responsibilities of each position which is involved in the work.

15. Other mobilization items approved by the ENGINEER required to support the complete work (e.g., Health and Safety Plans for Hazardous Waste).

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 71 13-2
Mobilization
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 74 03-1
Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 74 03

CLEANING
PART 1 - GENERAL

1.1 WORK INCLUDED
A. This Section covers the work necessary for cleaning during construction and final cleaning on completion of the Work.

1.2 GENERAL
A. At all times maintain areas covered by the Contract and public properties free from accumulations of waste, debris, and rubbish caused by construction operations.

B. Pollution Control:

1. Conduct cleaning and disposal operations to comply with local ordinances and anti- pollution laws.

2. Do not burn or bury rubbish and waste materials on project site.

3. Volatile wastes shall be properly stored in covered metal containers and removed daily.

4. Do not dispose of volatile wastes such as mineral spirits, oil, or paint thinner in storm or sanitary drains.

5. Do not dispose of wastes into streams or waterways.

C. Construction materials such as concrete forms and scaffolding shall be neatly stacked by the CONTRACTOR when not in use. The CONTRACTOR shall promptly remove splattered concrete, asphalt, oil, paint, corrosive liquids, and cleaning solutions from surfaces to prevent marring or other damage.

D. Use only cleaning materials recommended by manufacturer of surface to be cleaned.

E. Use cleaning materials only on surfaces recommended by cleaning material manufacturers.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.1 CLEANING DURING CONSTRUCTION
A. During execution of Work, clean site and public properties and dispose of waste materials, debris, and rubbish to assure that buildings, grounds, and public properties are maintained free from accumulations of waste materials and rubbish.

B. Wet down dry materials and rubbish to lay dust and prevent blowing dust.

01 74 03-2
Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

C. Provide approved containers for collection and disposal of waste materials, debris, and rubbish. Empty containers within one day after they are full.

D. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign materials from exposed and semi-exposed surfaces.

E. Repair, patch, and touch up marred surfaces to specified finish to match adjacent surfaces.

F. Vacuum clean all interior spaces, including inside cabinets. Broom clean paved surfaces, rake clean other surfaces of grounds.

G. Handle materials in a controlled manner with as few handlings as possible; do not drop or throw materials from heights.

H. Schedule cleaning operations so that dust and other contaminants resulting from cleaning process will not fall on wet, newly painted surfaces.

I. Vacuum clean interior building areas when ready to receive finish painting and continue vacuum cleaning on an as-needed basis until building is ready for substantial completion or occupancy.

3.2 FINAL CLEANING
A. Refer to the requirements of the Contract Documents in addition to the requirements of this Section.

B. See Section 01 77 03, Operational Completion and Project Closeout , for additional requirements.

C. At the completion of Work on all Contracts and immediately prior to final inspection, cleaning of the entire Project will be accomplished according to the following provisions:

1. The CONTRACTOR shall thoroughly clean, sweep, wash, and polish all work and equipment, including finishes. The cleaning shall leave the structures and site in a complete and finished condition to the satisfaction of the ENGINEER.

2. Should the CONTRACTOR not remove rubbish or debris or not clean the building and site as specified above, the CITY reserves the right to have the cleaning done at the expense of the CONTRACTOR.

3. Employ professional cleaners for final cleaning.

4. In preparation for substantial completion of occupancy, conduct final inspection of sight-exposed interior and exterior surfaces, and of concealed spaces.

5. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign materials from sight -exposed interior and exterior finished surfaces; polish surfaces so designated to shine finish.

6. Repair, patch, and touch up marred surfaces to specified fini sh, to match adjacent surfaces.

7. Broom clean paved surfaces; rake clean other surfaces of grounds.

8. Replace air-handling filters if units were operated during construction.

9. Clean ducts, blowers, and coils, if air -handling units were operated witho ut filters during construction.

10. Clean luminaires in accordance with manufacturer's recommendations. Clean all light fixtures.

01 74 03-3
Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

11. Remove from the CITY's property all temporary structures and all materials, equipment, and appurtenances not required as a part of, or appurtenant to, the completed work. See Section 01 51 03 - Temporary Construction Facilities and Utilities.
+ + END OF SECTION + +

01 74 03-4
Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

01 75 06-1
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 75 06

TESTING, TRAINING, AND STARTUP
PART 1 - GENERAL

1.1 GENERAL
A. Scope:

1. This Section covers general equipment and system testing and startup requirements, services of the manufacturer's representatives and special coordinating services required of the CONTRACTOR that shall apply during construction and training of the CITY's personnel for facilities operation.

2. Specific testing and tracking procedures and requirements found in the Technical Specifications shall also apply.

B. The CONTRACTOR shall inform all Subcontractors and manufacturers of the requirements herein and include the required services in their costs for the work specified in these Contract Documents. Where a minimum amount of time is stated in the Technical Specifications for manufacturers' services, any additional time required to perform the specified services shall be provided at no additional cost to the CITY.

C. Scheduling:

1. Equipment testing and startup are requisite to satisfactory completion of the Contract and, therefore, shall be completed within the contract time.

2. All equipment testing and plant startup activities shall be realistically allowed for and shown on the CONTRACTOR's Construction Schedule, in accordance with Section 01 32 13, Progress Schedule.

3. All equipment testing and plant startup activities shall be scheduled in conformance with the restrictions specified in Section 01 14 03, Special Project Constraints.

D. Equipment testing shall be satisfactorily completed prior to commencing plant startup associated with the particular equipment item or equipment package. The equipment shall not be considered ready for testing until the following conditions are satisfied:

1. Manufacturer's certification of equipment installation has been accepted by the ENGINEER.

2. Electrical and/or instrumentation Subcontractor certification of motor control logic has been accepted by the ENGINEER.

3. Related Technical Submittals, O&M Manual and Final Shop Drawings have been accepted by the ENGINEER.

4. Operator training services have been furnished by the CONTRACTOR (operational testing only).

5. Testing procedures have been submitted in writing and accepted by the ENGINEER in accordance with Section 01 33 03, Submittal Procedures. All testing procedures and results shall be submitted in writing.

E. The requirements of plant startup specified herein shall also apply to the startup of individual treatment plant processes and facilities.

F. Startup Plan:

01 75 06-2
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Not less than 3 months prior to initial equipment or system startup, the CONTRACTOR shall submit to the ENGINEER for review, a detailed Facilities Startup Plan for the associated items of equipment and/or systems.

2. The Startup Plan shall include:
a. A detailed sub-network of the CONTRACTOR's Construction Progress Schedule including the following activities:
1) Manufacturer's Services;
2) Installation Certifications;
3) Operator Training;
4) O&M Manual;
5) Functional Testing;
6) Performance Testing;
7) Operational Testing;
8) All other activities necessary to affect a coordinated and successful Testing, Training and Startup.
b. Written testing plan with proposed data logs for each item of equipment to be tested.
c. A discussion of any coordination required with the CITY’s staff and/or any system or equipment outage requirements.
d. The Plan shall be updated and/or revised as necessary prior to subsequent Construction Progress Meetings.
e. Testing shall not be scheduled earlier than 30 days after approval of the Plan.

1.2 SERVICES DURING CONSTRUCTION
A. General:

1. Manufacturer’s Representative:
a. The CONTRACTOR shall provide the services of competent and experienced technical representatives of the manufacturers of all equipment and systems furnished under the contract, for as many days as may be necessary for assembly, installation, testing assistance and operator training. b. Manufacturer's field representatives shall observe, instruct, guide, and direct CONTRACTOR's erection or installation procedures, or perform an installation check, as required.
c. In each case, the CONTRACTOR shall arrange to have the manufacturer's representative revisit the job site as often as necessary until operator training is complete and testing and startup problems have been resolved to the satisfaction of the ENGINEER.
d. This requirement applies to manufacturers of all equipment furnished (excluding manually operated valves smaller than 24 inches in size, and any other items of equipment specifically exempted by the ENGINEER in writing), whether or not specifically set forth in the Technical Specifications. e. The CONTRACTOR shall maintain a service record on each item of equipment and shall deliver these service records to the ENGINEER prior to acceptance of operational testing.

B. Fulfillment of Specified Minimum Services:

1. The CONTRACTOR shall obtain prior written approval from the ENGINEER for providing manufacturers' services.

2. All requests to the ENGINEER for prior approval shall (1) be in writing, (2) be submitted not less than 10 calendar days prior to the providing of the subject

01 75 06-3
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

services, (3) state the service to be provided, and (4) state the reason(s) why the timing of the service is appropriate.

3. Request made to the ENGINEER less than 10 calendar days prior to the manufacturers' services may not receive consideration and response prior to the times the services are provided.

4. Visits of manufacturers and their representatives to the jobsite or training classroom without prior approval as provided herein may not act to fulfill the specified minimum man-day requirements.

C. Certificate of Proper Installation:

1. Equipment requiring factory tests shall not be delivered to the jobsite until the CONTRACTOR submits acceptable certified test results to the ENGINEER.

2. Equipment shall not be considered ready for functional testing until after the following certifications have been submitted and accepted by the ENGINEER. a. Manufacturer Representatives:
1) The CONTRACTOR shall require that each manufacturer's representative furnish to the ENGINEER a written and signed report addressed to the CITY certifying that the equipment has been properly installed, adjusted, lubricated, is in accurate alignment, is free from any undue stress imposed by connecting piping or anchor bolts, has been operated satisfactorily under full-load conditions and is ready for full-time operation. 2) For pumps, compressors, blowers, engines, motors, and other rotating or reciprocating equipment, the report shall certify that the equipment operates within the manufacturer's allowable limits for vibration. 3) The report shall also certify that all controls, protective devices, instrumentation, and control panels furnished as part of the manufacturer's equipment package are properly installed and calibrated; and that the control logic for equipment startup, shutdown, sequencing, interlocks, and emergency shutdown has been tested and is properly operating. 4) The CONTRACTOR shall also sign said certification.
5) The CONTRACTOR shall submit "Manufacturer's Certification of Proper Installation" on the CITY form.
b. Electrical and Instrumentation Subcontractor:
1) The CONTRACTOR shall require that the electrical and/or instrumentation Subcontractor shall furnish a written and signed report to the ENGINEER certifying that the motor control logic for the equipment item that resides in motor control centers, control panels, control boards, microprocessors, distributed processing units, computers, and the like furnished by the electrical and/or instrumentation Subcontractor has been properly tested and calibrated.
2) The report shall certify that the control logic for equipment startup, shutdown, sequencing, interlocks, and emergency shutdown has been tested and is properly operating.
3) The CONTRACTOR shall also sign said certification.

1.3 STARTUP AND TESTING
A. General:

1. The CONTRACTOR shall provide the effective coordination of all parties necessary for the successful project startup.

01 75 06-4
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. The ENGINEER shall not be responsible to instruct the CONTRACTOR in the startup of the project, however, the ENGINEER will be available prior to and during startup to provide operational and technical support to the CONTRACTOR.

3. The CONTRACTOR shall furnish all labor, consumables (power, water, chemicals, air, etc.) tools, equipment, instruments, and services required and incidental to completing all functional, performance and operational testing of installed equipment.

4. The CONTRACTOR shall submit for favorable review the proposed test procedures to the ENGINEER for review at least 30 days prior to testing.

5. After favorable review of the test procedures, t he CONTRACTOR shall give the ENGINEER written notice confirming the date of testing at least five working days before the time the equipment is scheduled to be tested.

6. All testing shall be witnessed by the ENGINEER to be considered valid.

7. Test Reports:
a. CONTRACTOR shall submit written detailed results of all functional, performance and operational testing.
b. Upon successful completion of Operational testing all equipment installation, testing and maintenance records shall be submitted to the ENGINEER. c. Said records shall be bound separately for each piece of equipment or system and shall be collected by type of record.

8. For factory tests, written test results shall be submitted to the ENGINEER at least 10 days prior to shipment.

B. Functional testing:

1. All items of mechanical and electrical equipment shall be functionally tested by the CONTRACTOR after installation for proper operation.

2. A minimum of ten (10) days prior to the start of functional testing, the CONTRACTOR shall submit interconnection diagrams for the equipment and for the alarms, controls and instruments associated with the equipment. This requirement shall not relieve the CONTRACTOR of meeting any requirements in the technical specifications for earlier submittal of the interconnection diagrams.

3. Minimum Test Requirements
a. The functional test of each piece of mechanical equipment shall continue for not less than eight (8) continuous hours without interruption. b. The functional test shall include checking for proper rotation, alignment, speed, flows, pressure, vibration, sound level, etc. Initial equipment and system adjustment and calibrations shall be performed in the presence of and with the assistance of the manufacturer's representative.
c. The functional test shall include a demonstration of the proper performance of all alarms, local and remote controls, instrumentation, equipment functions, and all other electrical, mechanical, and piping systems.
d. All parts shall operate satisfactorily in all respects, under continuous full load, and in accordance with the specified requirements, for the full duration of the eight-hour test period.
e. If any part of a unit shows evidence of unsatisfactory or improper operation during the eight-hour test period, correction or repairs shall be made and the full eight-hour test operation, as specified herein, shall be repeated after all parts operate satisfactorily.

C. Performance testing:

1. Where performance testing is required by the Technical Specifications, the testing shall be supervised by the manufacturer's representative. These services shall

01 75 06-5
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

continue until such times as the applicable equipment or system has been successfully tested for performance and has been accepted by the ENGINEER for operational testing.

2. Performance testing shall take place after functional testing is successfully completed in accordance with Article 1.3 B.

3. Performance testing shall demonstrate that the equipment meets all performance requirements specified.

D. Startup/operational testing:

1. Upon successful completion of operator training and the functional, performance and leakage testing, the CONTRACTOR shall startup the facilities and test the equipment operation and performance by conducting a seven (7) day, continuous operational test of the completed facilities as an operational process unit to demonstrate to the ENGINEER's satisfaction that all equipment and systems required by these specifications will operate in the manner in which they are intended to perform.

2. The CITY will provide CONTRACTOR-trained operating personnel for the duration of the operational test. Said operation shall be conducted and under the supervision and direction of the CONTRACTOR and/or manufacturer's representative.

3. Operational Defects:
a. All defects in materials or workmanship which appear during the operational test shall be immediately corrected by the CONTRACTOR.
b. In the event of a malfunction or deficiency that results in shutdown or partial operation of a system or process unit or results in performance that is less than that specified, the startup duration shall be repeated for that corresponding system or process unit and any other affected equipment so its proper operation and performance as required by the Contract Documents is demonstrated for a minimum of seven (7) continuous and trouble free days.

4. If the operational test is interrupted through no fault of the CONTRACTOR, the test may resume at the earliest mutually agreeable time.

5. No unit process or part thereof shall be placed in service until it has successfully completed operational testing.

6. During plant startup, the CONTRACTOR shall provide the appropriate construction trades and the services of authorized Manufacturer's representatives for operational testing and as necessary, to correct faulty equipment operation.

7. After completion of all startup/operational testing, the CONTRACTOR shall repaint, hose, scrub, clean up and otherwise return the work to a "like new" condition, prior to CITY acceptance.

1.4 TRAINING OF CITY PERSONNEL
A. General:

1. Operation and maintenance training of CITY's personnel shall be provided for mechanical, electrical, instrumentation and control equipment as listed in this Section or elsewhere in the Specifications.

2. For the purposes of this requirement, operations training is considered to be separate from maintenance training. Instructions are to be tailore d to the needs of each group.

3. These training services shall be conducted by the manufacturer's representative and shall ensure measurable and observable means that CITY’s personnel are qualified to perform equipment task requirements, including essential k nowledge, skills , and abilities.

01 75 06-6
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

4. Training shall be conducted by competent representatives who are certified by the manufacturer to be thoroughly familiar with the subject matter as well as instructional methods.

5. Training materials shall be submitted to the CITY (see Paragraph 1.4 C below) for review. Acceptance of training materials is required prior to start of training.

6. All training shall be completed prior to beginning operational testing.

7. The CITY shall have the right to videotape any or all training sessions, or may designate separate sessions or portions thereof for the sole purpose of videotaping.

B. Training coordinator:

1. The CONTRACTOR shall designate and provide one or more persons to be responsible for coordinating and expediting training duties.

2. The person or persons so designated shall be present at all training coordination meetings with the CITY.

C. Training schedule:

1. The CONTRACTOR's coordinator shall coordinate the training periods with CITY’s personnel and manufacturer's representatives, and shall submit a training schedule and the training materials for each piece of equipment or system for which training is to be provided.

2. The training schedule shall be submitted not less than 21 calendar days prior to the time that the associated training is to be provided and shall be based on the then current Plan of Operation.

3. Equipment and/or systems shall be deemed suitable for use in training upon satisfactory completion of functional testing.

4. All training with regards to a unit process or part thereof shall be completed prior to the start of operational testing.

5. As a minimum, training shall be provided on the following equipment and systems:
a. Pumps
b. Electrical Systems
c. Instrumentation and Controls
d. Generator

6. The CONTRACTOR shall provide distinct and separate training sessions for both operations and maintenance personnel, meeting the following criteria:
a. Maintenance Training:
1) Maintenance training shall be provided for all items in 1.4.C.5 above. 2) Maintenance training shall be scheduled on at least one day shift, Monday through Thursday.
3) Training shall emphasize theory of operations, troubleshooting, and preventative maintenance and repair procedures.
4) The discussion shall encompass issues relating to instrumentation, electrical, and mechanical systems.
b. Operations training:
1) Operations training shall be provided for each piece of e quipment listed in Paragraph 1.4.C.5 above.
2) Operations and/or Maintenance training shall be scheduled on three consecutive day shifts, Tuesday through Thursday.
c. Training session schedules shall be approved by the ENGINEER. d. Training shall emphasize theory of operations, startup instructions, emergency and normal shutdown instructions, lockout procedures, troubleshooting, preventative maintenance, and alarm and control logic.

01 75 06-7
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

7. The CONTRACTOR shall confirm each training period a minimum of three working days prior to the schedule time.

8. If a manufacturer's representative fails to conduct a scheduled training class, the CONTRACTOR hereby agrees to compensate the CITY for labor costs, including overhead, for all CITY personnel in attendance for the entire scheduled training period.

9. If the CONTRACTOR or the manufacturer's representative fails to provide training that qualifies the CITY personnel to perform equipment task requirements, the CONTRACTOR hereby agrees to provide remedial training to ensure CITY personnel proficiency at no additional cost to the CITY.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.1 RECORD KEEPING
A. The CONTRACTOR shall maintain as a minimum, the following records:

1. Equipment manufacturer's shop drawings.

2. Daily logs indicating all equipment testing and startup activities.

3. Log and time sheets of all manufacturer's representatives performing services on the jobsite.

4. Updated equipment testing and startup schedules.

5. Records of system cleaning.

6. Hydrostatic and pressure test records.

7. Equipment alignment and vibration measurements and corrective actions.

8. Equipment lubrication records.

9. Insulation resistance measurements.

10. Electrical phase, voltage, and amperage measurements.

11. Electrical breaker inspection, test, and adjustment records.

12. Logs of abnormal circuits and lifted wires.

13. Testing and validation of all central and alarm functions.

14. Data sheets of all testing and calibration of instrumentation devices and control loops including documentation of set points.

15. Equipment and system release logs (from construction to startup).

16. Daily work reports.

3.2 GENERAL PROCEDURES
A. The general work procedures listed below outline the work to be performed by the CONTRACTOR. Additional procedures applicable to specific equipment items are specified elsewhere.

B. Technical assistance and support:

1. Obtain the assistance of the appropriate construction trades and the manufacturer or vendor, as required for technical assistance during equipment installation, testing, and startup by the CONTRACTOR and for training of the CITY's Opera tion and Maintenance personnel.

2. Furnish names and telephone numbers of manufacturer's and vendor's current technical service representatives for use by the ENGINEER.

01 75 06-8
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

C. Instructions:

1. Maintain an adequate manufacturer's instruction file so that the information will be readily available during equipment testing and startup.

2. Prior to equipment testing, finalize, and transmit to the ENGINEER the applicable technical manuals as required under Section 01 33 03, Submittal Procedures of the Contract Specifications.

D. Removal of rust preventives:

1. Prior to equipment testing, remove all rust preventives and oils used to protect the equipment during the construction period whenever these protective materials will be detrimental to operation or equipment maintenance.

E. Lubricants:

1. At least 60 days prior to startup, provide a list of the manufacturer's recommended lubricants for use in the plant. All equipment lubrication shall be listed with the lubricant types and quantities recommended and approved by the equipment manufacturers.

2. Provide the necessary lubricants for startup and the initial 60 days of operation.

3. Flush systems and install the initial charge of all lubricants. Dispose of flushing oil in accordance with applicable regulations.

4. The CONTRACTOR shall lubricate the equipment in accordance with the manufacturer's recommendations until the equipment is accepted by the CITY.

5. Maintain a lubrication record for each item of equipment. The CONTRACTOR shall submit the lubrication records to the ENGINEER prior to equipment testing.

F. Packing and seals:

1. Install, adjust, and replace packing, mechanical seals, and accessories, as necessary, during the equipment testing and startup period.

2. Adjust seal water and flushing water flow rates in accordance with the equipment manufacturer's recommendations.

G. Removal of temporary bracing:

1. Prior to equipment testing, remove all temporary supports, bracing, or other foreign objects that were installed in vessels, transformers, rotating machinery, or other equipment to prevent damage during shipping, storage, and erection, and repair any damage sustained.

H. Rotation, alignment, and vibration:

1. Prior to equipment testing, check rotating machinery for correct direction of rotation and for freedom of moving parts before connecting the driver.

2. Prior to equipment testing, perform the cold alignment and hot alignment to the manufacturer's tolerances.

3. Prior to equipment testing, test equipment vibration and correct any vibration in excess of the manufacturer's recommendation.

I. Tie-ins at the contract limits:

1. Provide proper notification, preparation, and coordination for safe tie-ins and minimal interference with the pump station operation.

2. Obtain approval and make the necessary tie-ins at the unit limits as required by the Contract Documents and as approved by the ENGINEER.

3. Prior to startup, remove the temporary blind flanges, plugs, bulkheads, seals, etc.

01 75 06-9
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

J. Leak and pressure tests:

1. Provide the ENGINEER with 3-day advance notification in writing of the schedule for non-operating field leak tests or field pressure tests on piping and field fabricated equipment, unless otherwise directed by the ENGINEER.

2. Provide the water, air and any special media required for the test purposes.

3. Prior to startup, conduct all leak and pressure tests in accordance with applicable codes, regulations, and the Contract Documents, and as approved by the ENGINEER.

The CONTRACTOR is advised that the tests shall be witnessed by the ENGINEER, to be considered valid.

4. Maintain a record of the leak and pressure test data and work completed.

5. Dispose of the test media in a manner that is acceptable to and approved by the CITY and applicable regulatory agencies.

6. Isolate in-line equipment as necessary for protection against test pressure.

K. Pressure/vacuum safety relief devices:

1. Prior to equipment testing, test and adjust all safety devices as recommended by the equipment manufacturer.

2. Prior to plant startup, provide the ENGINEER with a list of all field or factory equipment settings.

L. Flushing and chemical/mechanical cleaning:

1. Prior to equipment operation, conduct all flushing, blowing, and chemical/mechanical cleaning operations without using the permanently installed equipment.

2. Provide any special media needed for flushing and/or cleaning purposes.

3. Dispose of all media in a manner that is acceptable to and approved by the CITY and the applicable regulatory agencies.

4. All systems shall be free of trash and construction debris before initiating startup.

5. Maintain a record of the work completed.

M. Screens, strainers, and blind flanges:

1. Provide and install temporary strainers, screens, and blind flanges as necessary to protect the equipment and to test the equipment and pipelines.

2. Prior to startup, remove all of the temporary blinds and temporary appurtenances.

3. Clean the screens and strainers as required during startup.

4. At the end of startup, clean all of the permanently installed screens and strainers.

N. Purging/inerting:

1. Prior to startup, purge and/or passivate the facilities as specified.

2. Install purge/inerting connections in accordance with the manufacturer's recommendations.

3. Provide purge or inerting materials and conduct the necessary operations as recommended by the equipment manufacturer.

O. Drying out:

1. Prior to startup, dry out the facilities as specified or recommended by the equipment manufacturer to prevent contamination of catalysts, operating materials, and/or product.

2. Dry out systems, protective coatings, refractories, and linings as specified or recommended by the equipment manufacturers.

01 75 06-10
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3.3 SPECIFIC PROCEDURES
A. In addition to the work responsibilities described in Subsection 3.2, the procedures outlined below further define the work responsibilities of the CONTRACTOR for specific systems and items of equipment.

B. Mechanical equipment:

1. Level baseplates and soleplates and grout under all load bearing surfaces.

2. Install suitable supports and flexible connections to alleviate any piping stresses that may be imposed on pumps, compressors, and drivers.

3. In accordance with the manufacturer's recommendations, chemically clean lube oil, seal oil, and cooling systems. Dispose of waste and cleaning media in a manner that is acceptable to and approved by the CITY and applicable regulatory agencies.

4. In accordance with the manufacturer's recommendations, charge the lube oil, seal oil, and cooling systems with flushing media and circulate for cleaning purposes.

Dispose of any flushing media in a manner that is acceptable to and approved by the CITY and applicable regulatory agencies.

5. Charge the lube oil systems, seal oil systems, and cooling systems with the amount and type of operating oil or coolant recommended by the manufacturer.

6. Operate the equipment and check for excessive vibration, abnormal operating noises, overheating and lubricant leakage, etc., and test any safety shutdown/alarm devices for proper operation, and make any operating tests required by the ENGINEER. The adjustments required for proper operation shall be made prior to operational testing.

7. Utilize manufacturer's representative for technical assistance during installation and startup.

8. Prior to startup, all sidewalks, gratings, handrails, safety chains, safety shields, etc., shall be installed.

9. Prior to startup, demonstrate to the ENGINEER's satisfaction that all chemical solution pipelines are connected to the intended pump(s) and application points, and that the pipes, appurtenances contained therein and diffusers will oper ate at the intended flow rates.

10. Prior to startup, the applicable safety equipment, emergency shower and eyewash units, fire extinguishers, fire suppression equipment, self -contained breathing apparatus, toxic and/or combustible gas detectors (including the respective personnel warning system), protective clothing, emergency repair kits, etc., shall be installed in an acceptable manner-subject to the ENGINEER's approval, and be fully ready for operation.

11. All safety hazards, e.g., exposed drive shafts or rotating equipment members, exposed electrical circuitry, open electrical junction boxes and panels, improperly supported piping and conduits, missing safety devices, etc., shall be corrected prior to supplier training of the CITY's personnel.

12. The CONTRACTOR shall perform a comprehensive safety inspection and correct any safety deficiencies found before implementing plant startup.

13. Roadways that are required for ambulance service, fire fighting access, delivery of treatment chemicals and supplies, and disposal of the treatment byproducts shall be completed prior to startup.

14. Prior to startup, install all warning and safety signs, labels, and devices.

C. Electrical power and lighting systems:

1. Provide the ENGINEER with 3-day advance notification in writing of the test schedule.

The CONTRACTOR is advised that the tests shall be witnessed by the ENGINEER.

01 75 06-11
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Perform insulation resistance tests on all wiring 120 volt and larger. Do not use meggar instruments or solid-state devices.

3. Perform insulation resistance tests on all motor and transformer windings from phase to phase and phase to ground.

4. Perform grounding system tests to determine the continuity of connections and the value of resistance to ground.

5. Fill electrical gear with oil and/or other media as recommended by the equipment manufacturer.

6. Prior to energizing electrical equipment, startup, test and set switchgear and circuit breaker relays for proper coordination and operation.

7. The CONTRACTOR shall obtain the services of a qualified "independent testing service", member of the National Electric Testing Association, to perform a thermographic survey on all switchgear buses, insulators and power connections when energized and under at least 20 percent load. Significant hot spots shall be further checked by infrared pyrometer for exact temperature rise. The CONTRACTOR shall troubleshoot and correct the thermographic hot spots. Correction shall be verified by repeating the thermographic survey at no additional cost to the CITY.

8. The CONTRACTOR shall obtain the services of a qualified "independent testing service", member of the National Electric Testing Association, to inspect and test the protective relays and the 800 -ampere and larger drawout breakers for proper installation, adjustment, and operation in accordance with th e manufacturer recommendations.

9. The CONTRACTOR shall obtain the services of a qualified "independent testing service", member of the National Electrical Testing Association, to perform DC high potential tests on all cables that will operate at more than 2,000 volts to ground.

10. Obtain local electrical inspector's approval where required.

11. Energize all substations, with approval of the Utility Company and the ENGINEER after completion of all electrical testing.

12. Prior to startup, perform tests and adjustments on all switchgear and motor control equipment to demonstrate proper operation and conformance to the Contract Documents and manufacturer's recommended settings.

13. Prior to startup, test installation of emergency power and lighting systems for proper operation, including light intensity.

14. Prior to startup, provide the ENGINEER with a record of all te st data and the work completed.

15. Vacuum clean all electrical equipment prior to startup and acceptance.

D. Piping systems:

1. Provide the ENGINEER with 3-day advance notification in writing of test schedule.

2. Hydrostatically or pneumatically test all piping as required by the codes and contract documents.

3. After successful testing of the piping, slowly drain the system and then flush the system. Orifice plates shall be installed after testing. If installed with the piping, they will be removed and replaced with spacers or pipe spools of equal length prior to the pressure test.

4. Dewater the system, remove blind flanges, and perform tightness tests, as required by the ENGINEER.

5. Insulate or paint piping, flanges, threaded joints, or field welds after the specified testing of each item has been completed unless instructed otherwise b y the ENGINEER.

01 75 06-12
Testing, Training and Startup
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

6. Leave exposed all welded joints (longitudinal, girth, and nozzle) in underground piping that have not been shop tested until the specified testing has been completed.

After final testing of these joints, cover the system.

7. Prior to substantial completion and startup, check pipe hangers, supports, guides, and pipe specialties for the removal of all shipping and erection stops and for the correctness of the cold and hot settings for the design service. Make adjustments as necessary to obtain proper installation. Provide the ENGINEER with instructions for the hot settings.

8. As necessary during equipment testing and at the end of substantial completion and startup, clean or replace the screens and filter elements as appropriate for the filter type and service.

9. Prior to startup, verify, to the extent required by the ENGINEER, that specified valve packing has been provided on valves installed in the plant.

10. Prior to startup, install all of the valve and piping system identification labels.

11. Prior to startup, check and record the position of all process system valves.

12. Prior to startup, correct support, vibration, and thermal expansion problems detected during the preliminary equipment testing.

13. Prior to the startup, retorque all hot and cold service bolting as required to ensure a permanent and proper installation.

14. Prior to startup, demonstrate to the ENGINEER's satisfaction that each piping system (e.g., chemical, sample, utility, irrigation process, etc.) functions as designed and required by the Contract Documents.
+ + END OF SECTION + +

01 77 03-1
Operational Completion and Project Closeout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 01 77 03

OPERATIONAL COMPLETION AND PROJECT CLOSEOUT
PART 1 - GENERAL

1.1 GENERAL
A. Closeout is hereby defined to include general requirements near the end of the Contract Time, in preparation for Final Completion, Final Payment, normal termination of Contract, occupancy by CITY and similar actions evidencing completion of the Work.

B. Specific requirements for individual units of Work are specified in Sections of Divisions 2 through 43.

C. Where a conflict exists between this section and the Contract Documents, the conditions in the Contract Documents take precedence.

1.2 CERTIFICATION OF SUBSTANTIAL COMPLETION
A. Prior to requesting the ENGINEER's inspection for certification of each phase as Substantially Complete, the CONTRACTOR shall certify in writing that each phase of the Work is Substantially C omplete and shall submit a list of known items still to be completed or corrected (Contractor’s punchlist) prior to Contract Completion.

B. The following items shall be completed:

1. CITY has been advised of any pending insurance changeover requirements.

2. Specific warranties, maintenance agreements, final certifications and similar documents have been submitted.

3. All tools, spare parts, extra stocks of materials, and similar physical items have been delivered to CITY.

4. Instruction of CITY's operation/maintenance personnel and start up testing has been completed.

5. Submittal and acceptance of all O&M manuals.

6. Changeover of locks to CITY's cores/keys.

C. Punchlist:

1. When the CONTRACTOR considers that the Work, or a portion or phase thereof which the CITY agrees to accept separately, is Substantially Complete, the CONTRACTOR shall certify in writing that the work is Substantially Complete and shall prepare and submit to the ENGINEER a comprehensive list of items to be completed or corrected prior to Contract Completion (punchlist).

2. The ENGINEER may add additional work items to the punchlist.

3. Failure to include an item on the punchlist does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents.

4. Upon receipt of the CONTRACTOR's punchlist, the ENGINEER will make an inspection to determine whether the Work or designated portion thereof is Substantially Complete.

5. If the ENGINEER's inspection discloses any item, whether or not included on the CONTRACTOR's list, that is not in accordance with the requirements of the Contract Documents, the CONTRACTOR shall, upon notification by the ENGINEER and before

01 77 03-2
Operational Completion and Project Closeout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

an issuance of the Certificate of Operational Completion is provided, complete or correct such item.

6. The CONTRACTOR shall then submit a request for another inspection by the ENGINEER.

7. When the Work or designated portion thereof is accepted by the ENGINEER to be Substantially Complete , the ENGINEER will prepare a Certificate of Operational Completion.

8. The date of Operational Completion shall be the date of the ENGINEER's inspection and acceptance.

1.3 FINAL CLEANUP
A. At completion, leave project clean and ready for use.

1. Legally dispose of waste materials, debris and rubbish off the site.

2. Remove grease, dust, dirt, stains, labels, fingerprints , and other foreign materials from exposed and enclosed surfaces.

3. Repair, patch and touch up all affected curbs, gutters, and sidewa lks to match adjacent surfaces.

4. Broom clean paved surfaces, rake clean other surfaces of grounds. Vacuum clean all interior surfaces, rake clean other surfaces of grounds.

1.4 CONTRACT AS-BUILT DRAWINGS
A. The CONTRACTOR shall prepare and submit Contract As-Built Drawings for the CITY.

1. The CONTRACTOR shall make a record of changes during construction on prints of the Drawings provided by the CITY for this purpose (Contract As-Built Drawings) as described in Section 01 33 03, Submittal Procedures.

2. ENGINEER will verify on a monthly basis and provide written verification that the Contract As-Built Drawings are being developed and kept updated prior to submitting CONTACTOR’S progress payment to the CITY.

3. The reproducible drawings on which changed conditions are recorded shall be returned to the ENGINEER prior to Final Completion.

1.5 WARRANTIES
A. The Contract Documents cover the CONTRACTOR's responsibility to remedy defects due to faulty workmanship and materials.

B. Special warranties are required by various Sections of these Specifications. Assemble written warranties, label and submit to the ENGINEER.

1. Equipment warranties shall be written in the manufacturer's standard form and shall be countersigned by the Subcontractor or supplier and the CONTRACTOR.

2. All other warranties shall be written on the Subcontractor's or supplier's letterhead and shall be countersigned by the CONTRACTOR.

1.6 SPARE PARTS AND MAINTENANCE MATERIALS
A. Spare parts and maintenance materials are required by various Sections of the Specifications.

1. Parts and materials shall be packaged so as to preclude damage in normal handling and storage.

01 77 03-3
Operational Completion and Project Closeout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Packages shall be labeled with full description of contents and project name and clearly identified as to which item of equipment they belong to. CONTRACTOR shall maintain a spare parts inventory list which shall be provided to the CITY prior to Final Completion.

3. Submit packaged parts and materials to ENGINEER.

4. Submit the value of all spare parts.

1.7 FINAL INSPECTION
A. Prior to requesting ENGINEER's final inspection for certification of Final Completion and Final Payment, complete the following and list known exceptions (if any):

1. Submit Final Payment request with final releases and supporting documentation not previously submitted and accepted.

2. Submit copy of final punchlist of itemized work to be completed or corrected, stating that each item has been completed or otherwise resolved for acceptance, endorsed and dated by ENGINEER.

3. Submit Consent of Surety.

4. Revise and submit evidence of final, continuing insurance coverage complying with insurance requirements.

B. Certify in writing that the work has been completed in accordance with the Contract Documents, and request ENGINEER's final inspection.

C. Reinspection:

1. Within seven (7) days after receipt of the CONTRACTOR's notice that the work has been completed, including punchlist items resulting from earlier inspections, and excepting incomplete items delayed because of acceptable circumstance, the ENGINEER will reinspect the work.

2. Upon completion of reinspection, ENGINEER will either prepare a certificate of Final Completion or advise the CONTRACTOR of work not complete or obligations not fulfilled as required for Final Completion.

3. If necessary, inspection procedure will be repeated.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
+ + END OF SECTION + +

01 77 03-4
Operational Completion and Project Closeout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

02 41 03-1
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 02 41 03

DEMOLITION
PART 1 - GENERAL

1.1 DEFINITIONS
A. “Demolish”: CONTRACTOR shall remove from the site as property of CONTRACTOR.

Demolition includes disconnecting, removal, loading, repairs, cleanup, transportation, unloading, disposal permits and fees, disposal, and all other items required to remove the material from the site.

B. “Salvage”: CONTRACTOR shall remove from area of Work and place in location designated by ENGINEER. Equipment is property of CITY. Salvage includes disconnecting, removal, repairs, cleanup, loading, transportation, unloading, and all other items required to remove and relocate the material.

C. “CITY to Remove”: CITY will remove from area of Work prior to CONTRACTOR commencing demolition Work for this area.

D. “Relocate”: CONTRACTOR shall relocate material shown to new locations shown on Drawings or stated herein. Relocation includes disconnecting, removal, reconnecting, attaching, repairs, and all other items required to relocate material to new location.

E. “Abandon”: CONTRACTOR shall disconnect and leave in place as specified.

F. “Materials”: Any and all items and objects that are scheduled, specified, or shown to be demolished, salvaged, removed, relocated, or abandoned.

1.2 SUBMITTALS
A. Submittals:

1. Product Information: Grout, sealants, and bonding agents to be used for patching.

B. Informational Submittals:

1. Plan and schedule phased demolition, including limits of demolition, as part of and consistent with the progress schedule specified in Section 01 32 13, PROGRESS SCHEDULE.

2. Methods of demolition and equipment proposed to demolish materials.

3. Copies of any authorizations and permits required to perform Work.

4. Copies of Hazardous Materials Inspection Reports.

5. Repair procedures for demolition of materials beyond limits shown on Drawings.

02 41 03-2
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

PART 2 - PRODUCTS

2.1 GENERAL
A. CONTRACTOR shall provide all materials and equipment in suitable and adequate quantity as required to accomplish the Work shown, specified herein, and as required to complete the Project.

PART 3 - EXECUTION

3.1 GENERAL
A. Drawings are based on available information. The Work may differ slightly from what is shown. CONTRACTOR shall be responsible for determining the work required by inspecting the site.

3.2 SAFETY REQUIREMENTS
A. All Work shall be done in conformance with all applicable rules and regulations pertaining to safety.

B. Hazardous Materials:

1. See General Conditions.

2. Existing facilities, or portions thereof, to be demolished may contain hazardous materials such as asbestos cement piping, residual chemicals in existing or abandoned piping, lead -based paint, mercury seals, or other unknown hazardous materials.

3.3 SEQUENCE
A. Be responsible for the sequence of Work.

B. Conform to constraints as specified in Section 01 14 03, SPECIAL PROJECT CONSTRAINTS.

3.4 COORDINATION
A. Coordination with ENGINEER:

1. Only materials specified herein, shown on the Demolition Photographs or the Drawings, or approved by ENGINEER in the field shall be demolished, salvaged, removed, relocated, or abandoned.

2. Verify materials scheduled to be demolished, salvaged, removed, relocated, or abandoned with ENGINEER prior to performing Work.

3. Do not remove materials without prior approval of ENGINEER.

4. Provide at least 3 working days’ notice to ENGINEER prior to start of Work.

5. Notify ENGINEER to turn off affected services or facilities before starting Work.

6. Provide temporary services during interruptions to affected services or facilities as acceptable to ENGINEER.

7. ENGINEER will indicate limits of Work if not clearly shown.

B. Coordination with Utility Owners:

02 41 03-3
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Notify utility owners to turn off affected services or facilities before starting Work.

2. Provide not less than 72 hours notice to utility owners prior to shutdown, unless otherwise directed by utility owners.

3. Provide temporary services during interruptions to affected services or facilities as acceptable to utility owners.

3.5 LIMITS
A. Drawings define minimum portions of materials to be demolished. Unless otherwise shown, rough cuts or breaks may be made to limits of demolition shown. If rough cuts or breaks are made exceeding limits shown, CONTRACTOR shall repair the cuts or breaks back to the dimensions shown on Drawings at CONTRACTOR’s expense.

B. If limits are not clear on the Drawings or Demolition Photographs, limits shall be as directed by ENGINEER.

C. All areas not within the limits of demolition Work shown on the Drawings, or as specified herein, shall be left undisturbed, unless necessary for demolition of materials.

3.6 DEMOLITION
A. General:

1. Inspect condition of materials to be demolished prior to bidding to assess potential for salvage value.

2. Remove all materials associated with existing equipment that is to be demolished.

3. Materials within limits of demolition will become the property of CONTRACTOR.

4. All materials from the demolition process shall be removed safely from the project site as soon as possible. They shall be disposed of in accordance with applicable federal, state, and city regulations. CONTRACTOR is responsible for determining these regulations and shall bear all costs associated with disposal of the materials.

B. Pavement and Curbs:

1. Provide saw cut at all concrete and pavement surfaces and curb removal limits and where neat connection lines are required.

2. Surfaces exposed by demolition activities shall be repaired and finished to provide a uniform, smooth, level transition between adjacent surfaces.

C. Concrete, CMU, and Reinforcing:

1. In areas where concrete or CMU portions are to be removed from a structure, the edge of removal shall be cut with a concrete saw to leave a perpendicular edge or by core-drilling where a circular hole is required.

2. Damaged concrete shall be removed to solid concrete. Damaged concrete shall include concrete that is soft, spalled, cracked, or otherwise damaged as determined by ENGINEER.

3. Depth of removal shall be as determined by ENGINEER unless otherwise shown or specified.

4. Reinforcing shall be cut and removed unless otherwise shown or instructed by ENGINEER.

5. Spalled edges may be required to be re-sawn at the discretion of the ENGINEER.

6. Protect adjacent structures and equipment from damage during Work.

7. Exposed surfaces following demolition activities shall be repaired and finished to provide a uniform, smooth, and level transition between adjacent surfaces.

02 41 03-4
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

8. Remove and repair designated cracked and damaged concrete areas shown in accordance with this section and Section 03 30 03, CAST-IN-PLACE CONCRETE.

D. Concrete Embedded Items:

1. Except for core drills, demolish anchor bolts, reinforcing steel, conduit, and other materials that are concrete embedded to a minimum of 1 inch below final finished surface. For core drills, coat rebar exposed by core drilling with System No. 304 in accordance with Section 09 91 03, PAINTING.

2. Plug empty pipes and conduits with fireproof sealant to maintain fire ratings for floors or walls.

3. Patching:
a. Demolish damaged concrete. Damaged concrete shall be removed to solid concrete. Damaged concrete shall include concrete that is soft, spalled, cracked, or otherwise damaged as determined by ENGINEER.
b. Coat with approved bonding agent.
c. Patch with nonshrink, nonmetallic grout.

E. Piping:

1. Pressurized Services: Install restrained caps or plugs at the demolished ends, unless otherwise shown.

2. Gravity Services: Install concrete plugs, 5-foot minimum length.

F. Utilities:

1. Excavate utility lines serving structures to be demolished.

2. Demolish electrical, sanitary, and storm drainage lines serving structures to be demolished.

3. Support or relocate utility lines exposed by Work.

4. For water and gas lines to be demolished or capped and terminated, provide a permanent leakproof closure. Closure type shall be as recommended by utility owner.

G. Electrical:

1. Remove conduits and wiring from materials to be demolished back to nearest junction box.

2. For existing circuits to remain operational, intercept existing conduit at the most convenient location, or as shown, and splice and extend conduit to new location.

Install new conductors as required to accomplish intended results. New conductors shall be continuous without splices between junction boxes.

3. For existing circuits no longer needed, demolish conductors from conduits.

4. Demolish all surface-mounted conduit which is no longer needed.

5. For conduit below grade or concealed within walls, cap and abandon in place.

3.7 SALVAGE
A. Salvage materials for CITY’s own use where shown.

B. Remove materials with extreme care so as not to damage.

C. Promptly remove materials from Work area.

D. Store materials in location designated by ENGINEER.

E. Clean and protect materials from dust, dirt, natural elements, and store as directed.

02 41 03-5
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3.8 RELOCATION
A. ENGINEER will determine condition of materials prior to removal.

B. Remove all materials associated with items to be relocated.

C. Existing materials shall not be damaged during removal.

D. Properly store and maintain materials in same condition as when removed.

E. Clean and protect materials from dust, dirt, natural elements, and store as directed.

3.9 ABANDONMENT
A. Structures: Break holes into or core drill floor slabs, catch basins, and other below-grade concrete structures to be abandoned in place to allow water to freely migrate through.

B. Piping and Conduits:

1. General: Piping and conduits to be abandoned shall be capped with a watertight plug at demolished end in a manner that will prevent entrance of soil, groundwater, or moisture.

2. Pressurized Services: Install restrained caps or plugs at the demolished ends, unless otherwise shown.

3. Gravity Services: Install concrete plugs, 5-foot minimum length.

3.10 REPAIR AND REPLACEMENT
A. Any damaged materials scheduled to be salvaged or relocated shall be repaired by the CONTRACTOR to the satisfaction of ENGINEER or replaced at the CONTRACTOR’s expense.

B. Any damage to areas not within the limits of demolition Work shown on the Demolition Photographs, Drawings, or as specified herein shall be repaired or replaced to original precontract conditions at the CONTRACTOR’s sole expense.

3.11 DISPOSAL
A. Dispose of materials offsite in licensed landfills and in accordance with all local, state, and federal regulations. CONTRACTOR is responsible for obtaining any and all necessary permits for disposal.
+ + END OF SECTION + +

02 41 03-6
Demolition
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

03 21 03-1
Concrete Reinforcing
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 03 21 03

CONCRETE REINFORCEMENT
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes: Fabrication and placement of reinforcement including bars, ties and supports, and welded wire fabric for concrete, encasements and fireproofing.

1.2 SUBMITTALS
A. Shop Drawings:

1. Manufacturer's specifications and installation instructions for all materials and reinforcement accessories.

2. Drawings for fabrication, bending, and placement of concrete reinforcement. Comply with ACI 315, Parts A and B. For walls, show elevations to a minimum scale of 1/4- inch to 1-foot. For slabs, show top and bottom reinforcing on separate plan views.

Show bar schedules, stirrup spacing, diagrams of bent bars, arrangements and assemblies, as required for the fabrication and placement of concrete reinforcement, unless otherwise noted. Keep splices to a minimum. Avoid splices in regions of maximum tension stresses whenever possible.

B. Certificates: Submit one (1) copy of steel producer's certificates of mill analysis, tensile and bend tests for reinforcing steel.

1.3 QUALITY ASSURANCE
A. Reference Standards: Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified:

1. American Concrete Institute (ACI):
a. ACI 315, Manual of Engineering and Placing Drawings for Reinforced Concrete Structures.
b. ACI 318, Building Code Requirements for Reinforced Concrete.

2. Concrete Reinforcing Steel Institute:
a. Manual of Standard Practice, includes ASTM standards referred to herein.

B. Allowable Placing Tolerances: Comply with ACI 318, Chapter 7 - Details of Reinforcement.

1.4 DELIVERY, HANDLING, AND STORAGE
A. Deliver concrete reinforcement materials to the site bundled, tagged and marked. Use metal tags indicating bar size, lengths, and other information corresponding to markings shown on placement diagrams.

03 21 03-2
Concrete Reinforcing
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Store concrete reinforcement material at the site to prevent damage and accumulation of dirt or excessive rust. Store on heavy wood blocking so that no part of it will come in contact with the ground.

PART 2 - PRODUCTS

2.1 MATERIALS
A. Reinforcing Bars: ASTM A615, Grade 60 for all non-welded bars. ASTM A706, Grade 60 for welded bars.

B. Smooth Steel Dowels: ASTM A36.

1. Epoxy coated conforming to ASTM A775 or ASTM A934.

C. Mechanical Couplers: Reinforcement bars may be spliced with a mechanical connection.

Provide a full mechanical connection which shall develop in tension or compression, as required, at least 125% of specified yield strength (fy) of the bar in accordance with ACI 318 Section 12.14.3.2. The locations of the connections are subject to the approval of the ENGINEER.

1. Dayton Superior Bar Lock S/CA Series.

2. Or approved equal
D. Threaded Splicing Systems: Dowel Bar Splicer System shall comply with ICC Report #4028. The completed splice shall exceed 160% of the specified yield strength (fy) of the bar.

1. Dayton Superior DB/DI parallel threaded couplers.

2. Or approved equal
E. Steel Wire: ASTM A82.

F. Welded Wire Fabric: ASTM A185. Furnish in flat sheets, not rolls.

G. Column Spirals: Hot-rolled rods for spirals, ASTM A615.

H. Supports for Reinforcement: Bolsters, chairs, spacers and other devices for spacing, supporting and fastening reinforcement in place.

1. Use wire bar type supports complying with CRSI recommendations, except as specified below. Do not use wood, brick, or other unacceptable materials.

2. For slabs on grade, use 5000 psi concrete blocks.

3. At all formed surfaces, provide supports complying with CRSI "Manual of Standard Practice" as follows: Plastic protected or stainless steel legs.

4. For all PVC lined concrete surfaces, provide supports complying with CRSI "Manual of Standard Practice" as follows: Either plastic or metal plastic protected legs.

2.2 FABRICATION
A. General: Fabricate reinforcing bars to conform to required shapes and dimensions, with fabrication tolerances complying with CRSI, "Manual of Standard Practice". In case of

03 21 03-3
Concrete Reinforcing
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

fabricating errors, do not re-bend or straighten reinforcement in a manner that will injure or weaken the material.

B. Unacceptable Materials: Reinforcement with any of the following defects will not be permitted in the Work:

1. Bar lengths, bends, and other dimensions exceeding specified fabrication tolerances.

2. Bends or kinks not shown on approved Shop Drawings.

3. Bars with reduced cross-section due to excessive rusting or other cause.

PART 3 - EXECUTION

3.1 INSPECTION
A. Examine substrate and conditions under which concrete reinforcement is to be placed with installer, and notify ENGINEER, in writing, of unsatisfactory conditions. Do not proceed with the Work until unsatisfactory conditions have been corrected in a manner acceptable to ENGINEER.

3.2 INSTALLATION
A. Comply with the applicable recommendations of specified codes and standards, and CRSI, Manual of Standard Practice, for details and methods of reinforcement placement and supports.

B. Clean reinforcement to remove loose rust and mill scale, oil, earth, ice, and other materials that reduce or destroy bond with concrete.

C. Position, support, and secure reinforcement against displacement during formwork construction or concrete placement operations. Locate and support reinforcing by metal chairs, runners, bolsters, spacers and hangers, as required.

1. Place reinforcement to obtain the minimum concrete cover as shown. Arrange, space, and securely tie bars and bar supports together with 16 -gauge wire to hold reinforcement accurately in position during concrete placement operations. Slab and wall bars shall be tied at every intersection around the periphery of the slab or wall and not less than every 48 inches in the field at walls and 60 inches in the field at slabs.

2. Bar supports shall be placed no further than 4 feet apart in each direction. Supports must be completely concealed in the concrete and shall not discolor or otherwise mar the surface of the concrete.

3. Set wire ties so that twisted ends are directed away from exposed concrete surfaces.

4. Do not secure reinforcing steel to forms with wire, nails or other ferrous metal. Do not permit metal supports subject to corrosion to touch or be within the required clearance to formed or exposed concrete surfaces.

D. Install welded wire fabric in as long lengths as practical. Lap adjoining pieces at least one full mesh and lace splices with wire. Do not make end laps midway between supporting beams or directly over beams of continuous structures. Offset end laps in adjacent widths to prevent continuous laps.

03 21 03-4
Concrete Reinforcing
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

E. Provide sufficient numbers of supports of strength required to carry reinforcement. Do not place reinforcing bars more than 2 inches beyond the last leg of any continuous bar support. Do not use supports as bases for runways for concrete conveying equipment or similar construction loads.

F. Splices: Provide reinforcement lap splices by placing bars in contact, and tying tightly with wire. Comply with requirements shown for minimum lap of spliced bars.

G. Mechanical Couplers in Lieu of Lap Splicing:

1. Provide mechanical butt splices in accordance with the recommendation of the manufacturer of the mechanical splicing device. Butt splices shall develop 125 percent of the specified minimum yield tensile strength of the spliced bars or of the smaller bar in transition splices. Flame dry bars before butt splicing. Provide adequate jigs and clamps or other devices to support, align, and hold the longitudinal centerline of the bars to be butt spliced in a straight line.

H. Reinforcement Around Openings: Place an equivalent area of steel around the pipe or opening and extend on each side sufficiently to develop bond in each bar. See the Details on Drawings for bar extension length each side of opening. Where welded wire fabric is used, provide extra reinforcing using fabric or deformed bars.

I. Field Bending: Field bending of reinforcing steel bars is not permitted when rebending will later be required to straighten bars. Rebending of bars at the same place where strain hardening has taken place due to the original bend will damage the bar. Consult with the ENGINEER prior to any pour if the CONTRACTOR foresees a need to work out a solution to prevent field bending.

3.3 INSPECTION OF REINFORCEMENT
A. Do not place concrete until the reinforcing steel is inspected and permission for placing concrete is granted by ENGINEER. All concrete placed in violation of this provision will be rejected.

++ END OF SECTION ++

03 30 03-1
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 03 30 03

CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes: Place, finish, cure, strip, and repair concrete.

1.2 REFERENCES
A. American Concrete Institute (ACI)

1. ACI 211.1, Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete.

2. ACI 214, Recommended Practice for Evaluation of Strength Test Results of Concrete.

3. ACI 301, Specifications for Structural Concrete for Buildings, (includes ASTM Standards referred to herein).

4. ACI 304, Guide for Measuring, Mixing, Transporting and Placing Concrete.

5. ACI 305, Hot Weather Concreting.

6. ACI 306, Cold Weather Concreting.

7. ACI 309, Guide for Consolidation of Concrete.

8. ACI 311, Guide for Concrete Inspection.

9. ACI 318, Building Code Requirements for Reinforced Concrete.

10. ACI 347, Guide to Formwork for Concrete

11. ACI 350, Environmental Engineering Concrete Structures.

1.3 SYSTEM DESCRIPTION
A. Class A Concrete shall be steel reinforced and includes:

1. Foundations.

2. Walls.

3. Slabs.

4. Beams.

5. Girders.

6. Columns.

7. Equipment bases.

8. Pipe supports.

B. Class B Concrete shall be placed without forms or with simple forms, with little or no reinforcing, and includes:

1. Concrete fill.

2. Curbs and gutters.

3. Sidewalks.

4. Thrust blocks.

5. Encasements.

03 30 03-2
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1.4 SUBMITTALS
A. Samples: Submit samples of materials as specified and as otherwise may be requested by ENGINEER, including names, sources and descriptions.

B. Product Data: Submit for approval the following:

1. Manufacturer's specifications with application and installation instructions for proprietary materials and items, including admixtures and bonding agents.

2. List of concrete materials and concrete mix designs proposed for use. Include the results of all tests performed to qualify the materials and to establish the mix designs.

C. Laboratory Test Reports: Submit copies of laboratory test reports for materials and mix design tests
D. Delivery Tickets: Furnish to ENGINEER copies of all weighmaster certificate delivery tickets for each load of concrete delivered to the site. Provide items of information as specified in ASTM C94, Section 16. Delivery tickets shall be signed by a Certified Weighmaster.

1.5 QUALITY ASSURANCE
A. Tests for Concrete Materials: Submit written reports to ENGINEER, for each material sampled and tested, prior to the start of Work. Provide the Project identification name and number, date of report, name of CONTRACTOR, name of concrete testing service, source of concrete aggregates, material manufacturer and brand name for manufactured materials, values specified in the referenced specification for each material, and test results. Indicate whether or not material is acceptable for intended use.

B. If the concrete mix designs specified herein have not been used previously by the ready- mix supplier, mix proportions and concrete strength curves for regular cylinder tests shall be established by an approved ready -mix supplier or an independent testing laboratory based on the relationship of 7, 14 and 28 day strengths versus slump values of 2, 4 and 6 inches, all conforming to these Specifications. A laboratory, independent of the ready-mix supplier, shall be required to prepare and test all concrete cylinders. The costs for preparation of mix designs, not previously used by the ready-mix supplier, and testing of concrete and materials shall be borne by CONTRACTOR.

PART 2 - PRODUCTS

2.1 CONCRETE MATERIALS
A. Cement:

1. Portland cement, ASTM C150, Type II; or blended hydraulic cement, ASTM C595, Type 1P (MS).

2. Do not use cement which has deteriorated because of improper storage or handling.

B. Aggregates: ASTM C33 and as herein specified.

03 30 03-3
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Do not use aggregates containing soluble salts, substances such as iron sulfides, pyrite, marcasite, ochre, or other materials that can cause stains on exposed concrete surfaces.

2. Fine Aggregate: Provide clean, sharp, natural sand free from loam, clay, lumps or other deleterious substances.

3. Coarse Aggregate: Provide clean, uncoated, processed aggregate containing no clay, mud, loam, or foreign matter, as follows:
a. Crushed stone, processed from natural rock or stone. b. Coarse Aggregate Size: Size to be ASTM C33, Nos. 57 or 67, except that No. 467 may be used for footings, foundation mats and walls 16 inches or greater in thickness.

C. Water: Clean, free from injurious amounts of oils, acids, alkalis, organic materials or other substances that may be deleterious to concrete or steel.

2.2 CONCRETE ADMIXTURES
A. Provide admixtures produced by established reputable manufacturers, and use in compliance with the manufacturer's printed instruction. Do not use admixtures that have not been incorporated and tested in the accepted mixes, unless otherwise authorized in writing by ENGINEER.

B. Air-Entraining Admixtures: ASTM C260.

1. Product and Manufacturer: Provide one of the following:
a. SIKA AER, as manufactured by Sika Corporation.
b. MasterAir AE 200, as manufactured by BASF.
c. Daravair, as manufactured by W.R. Grace & Conn.
d. Or approved equal.

C. High-Range Water-Reducing Admixture (“Superplasticizer”): ASTM C494, Type F/G.

1. Superplasticizer shall be used in all Class A Concrete. Do not use high range water-reducing admixture containing more chloride ions than are contained in municipal drinking water. Add only at the job site to concrete in compliance with the manufacturer's printed instruction.

2. Product and Manufacturer: Provide one of the following:
a. Sikament 320, as manufactured by Sika Corporation.
b. MasterGlenium, as manufactured by BASF.
c. Daracem-100, as manufactured by W.R. Grace & Conn.
d. Or approved equal.

D. Water-Reducing Admixture: ASTM C 494, Type A.

1. A water-reducing, aqueous solution of a modification of the salt of polyhydroxylated organic acids. Do not use admixture containing any lignin, nitrates or chlorides added during manufacture.

2. Product and Manufacturer: Provide one of the following:
a. Eucon WR-75, as manufactured by The Euclid Chemical Company. b. MasterPozzolith, as manufactured by BASF.
c. WRDA series, as manufactured by W.R. Grace & Conn.
d. Or approved equal.

03 30 03-4
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

E. Pozzolanic Admixtures:

1. Pozzolanic admixtures shall not be used in structures with concrete in contact with potable water, but may be used in other concrete.

2. Provide Mineral admixtures, when used, meeting the requirements of ASTM C618 Class F.

3. A substitution by weight, of the portland cement by pozzolan, so that the total tricalcium aluminate content of the resulting cement plus pozzolan is not greater than 8%, will be considered. However, the pozzolan shall not exceed 20% by weight of the cement plus pozzolan.

F. Set-Control Admixtures: ASTM C494, as follows:

1. Type B, Retarding.

2. Type C, Accelerating.

3. Type D, Water-reducing and Retarding.

4. Type E, Water-reducing and Accelerating.

5. Type F, Water-reducing, high range admixtures.

6. Type G, Water-reducing, high range, and retarding admixtures.

G. Color Pigments:

1. Color pigments for colored concrete must be of iron oxides complying with ASTM C979.

H. Calcium Chloride: Do not use calcium chloride in concrete, unless otherwise authorized in writing by ENGINEER. Do not use admixtures containing calcium chloride where concrete is placed against galvanized steel.

2.3 PROPORTIONING AND DESIGN OF MIXES
A. Prepare design mixes of concrete. Mixes subject to the following limitations:

1. Class A Concrete
a. Specified 28-day Compressive Strength: 4,000 psi minimum. b. Air content: 5% ± 1%. For concrete placed at least 2 feet below the adjacent grade, an air-entraining admixture is not required unless otherwise specified. c. Slump, before addition of superplasticizer: 3½ inches ± ½ inches d. Slump, after addition of superplasticizer: 8-inch maximum

Coarse
Aggregate
Size
Cementitious
Content-Pounds Per
Cubic Yard
Water-Cement
Ratio by Weight
¾” 625 min, 800 max 0.375
1” 600 min, 800 max 0.385
1 ½” 590 min, 800 max 0.400

e. Use superplasticizer in all Class A Concrete. Use water reducers in combination with superplasticizers as required for mixing.

2. Class B Concrete
a. Specified 28-day Compressive Strength: 2,500 psi.
b. Maximum Water-Cement Ratio by Weight: 0.49.
c. Slump: 3-inch Minimum, 5-inch Maximum.

03 30 03-5
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Use an independent testing facility acceptable to ENGINEER for preparing and reporting proposed mix designs.

C. Admixtures:

1. Use air-entraining admixture in all concrete, except interior slabs subject to abrasion, unless otherwise shown or specified. Add air -entraining admixture at the manufacturer's prescribed rate to result in concrete at the point of placement having air content within the prescribed limits.

2. Use amounts of admixtures as recommended by the manufacturer for climatic conditions prevailing at the time of placing. Adjust quantities and types of admixtures as required to maintain quality control.

D. Colored Concrete:

1. The dosage of colored pigments for colored concrete must not exceed 10 percent by weight of cementitious materials in the concrete mix design.

2. When test panels are specified, cementitious materials and aggregates from the same sources used in the authorized test panel must be used for the colored concrete in the completed work.

2.4 EPOXY BONDING AGENT
A. For use in all dry-packed holes, concrete repair and for unplanned cold-joints.

B. Provide an epoxy-resin bonding agent, two component, polysulfide type.

C. Product and Manufacturer: Provide one of the following:

1. Sikadur 32, Hi-Mod LPL, as manufactured by Sika Corporation.

2. Eucopoxy LPL, as manufactured by the Euclid Chemical Company.

3. Or approved equal.

2.5 CONCRETE CURING MATERIALS
A. Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately 10 ounces per square yard and complying with AASHTO M182, Class 3.

B. Moisture Retaining Cover: One of the following, complying with ASTM C171.

1. Waterproof paper.

2. Polyethylene film.

3. White burlap-polyethylene sheet.

C. Curing Compound: ASTM C309 Type 1-D (water retention requirements):

1. Product and Manufacturer: Provide one of the following:
a. Super Aqua Cure VOX, as manufactured by The Euclid Chemical Company. b. Sealtight 1100, as manufactured by W.R. Meadows, Incorporated. c. Or approved equal.

D. Concrete Densifier and Chemical Hardener (Surface Applied)

1. Product and Manufacturer: Provide one of the following:
a. LS, as manufactured by Consolideck.
b. Liqui-Hard, as manufactured by W. R. Meadows.

03 30 03-6
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. Duro-Nox LS, as manufactured by Nox-Crete.
d. Or approved equal.

2.6 EMBEDDED ITEMS
A. Provide and install items such as plates, angles, inserts, bolts and similar items not specified elsewhere under this Section. Carbon steel embedded items shall be hot dip galvanized after fabrication.

B. Abrasive Stair Nosings

1. Provide single-component stair nosing

2. 3-inch width

3. Aluminum Extrusion, with provisions for anchoring into concrete

4. Extruded with multiple channels, dovetail shaped, filled with aluminum oxide grit set in epoxy resin

5. Designed for installation before concrete sets, at the front edge of the stair

6. Provide continuous stair nosings, width of stairway less 3 inches on each side . No splices in stair nosings.

7. Manufacturers/Models:
a. Balco; Model R-315P
b. Babcock Davis; Model BSTTB
c. Or Equal
PART 3 - EXECUTION

3.1 CONCRETE MIXING
A. Provide concrete produced by the ready-mixed process.

B. Comply with the requirements of ASTM C 94, and as herein specified. Proposed changes in mixing procedures, other than herein specified, must be accepted by ENGINEER before implementation.

1. Plant equipment and facilities: Conform to National Ready- Mix Concrete Association “Plant and Delivery Equipment Specification.”

2. Mix concrete in revolving type truck mixers that are in good condition and which produce thoroughly mixed concrete of the specified consistency and strength.

3. Do not exceed the proper capacity of the mixer.

4. Mix concrete for a minimum of two minutes after arrival at the job site, or as recommended by the mixer manufacturer.

5. Mix concrete during transit only as recommended by the mixer manufacturer.

6. Mix at proper speed until concrete is discharged.

7. Maintain adequate facilities at the job site for continuous delivery of concrete at the required rates.

8. Provide access to the mixing plant for ENGINEER at all times.

03 30 03-7
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3.2 TRANSPORTING CONCRETE
A. Transport and place concrete not more than 90 minutes after water has been added to the dry ingredients or before 250 revolutions of the drum or blades, whichever occurs first.

B. If an admixture is used to retard the set time and the concrete temperature does not exceed 85 degrees F, the travel and placing time may be extended to 120 minutes or 300 revolutions of the drum or blades, whichever occurs first.

C. Take care to avoid spilling and separation of the mixture during transportation.

D. Do not place concrete in which the ingredients have been separated.

E. Do not retemper partially set concrete.

F. Use suitable and approved equipment for transporting concrete from mixer to forms.

3.3 CONCRETE PLACEMENT
A. General: Place concrete continuously so that no concrete will be placed on concrete, which has hardened sufficiently to cause the formation of seams or planes of weakness within the section. Deposit concrete as nearly as practical in its final location to avoid segregation due to rehandling or flowing. Do not subject concrete to any procedure that will cause segregation.

1. Screed concrete that is to receive other construction to the proper level to avoid excessive skimming or grouting.

2. Do not use concrete which becomes non-plastic and unworkable, or does not meet the required quality control limits, or which has been contaminated by foreign materials. Do not use retempered concrete. Remove rejected concrete from the job site and dispose of it in an acceptable location.

3. Do not place concrete until all forms, bracing, reinforcement, and embedded items are in final and secure position.

4. Do not place in cold weather, unless adequate precautions are taken against frost action.

5. Do not place footings, piers or pile caps on frozen soil.

6. Unless otherwise approved, place concrete only when ENGINEER is present.

7. Allow a minimum of 3 days of curing before placing new concrete against a slab or wall already in place.

B. Concrete Conveying:

1. Handle concrete from the point of delivery and transfer to the concrete conveying equipment and to the locations of final deposit as rapidly as practical by methods that will prevent segregation and loss of concrete mix materials.

2. Provide mechanical equipment for conveying concrete to ensure a continuous flow of concrete at the delivery end. Provide runways for wheeled concrete conveying equipment from the concrete delivery point to the locations of final deposit. Keep interior surfaces of conveying equipment, including chutes, free of hardened concrete, debris, water, ice and other deleterious materials.

3. Pumping concrete is permitted, however do not use aluminum pipe for conveying.

03 30 03-8
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

C. Placing Concrete into Forms:

1. Deposit concrete in forms in horizontal layers not deeper than 24 inches and in a manner to avoid inclined construction joints. Where placement consists of several layers, place concrete at such a rate that concrete that is being integrated with fresh concrete is still plastic.

2. Do not permit concrete to free fall within the form from a distance exceeding 8 feet.

Use “elephant trunks” or “wall pipes” to prevent free fall and excessive splashing on forms and reinforcement.

3. Remove temporary spreaders in forms when concrete placing has reached the elevation of such spreaders.

4. Consolidate concrete placed in forms by mechanical vibrating equipment supplemented by hand-spading, rodding or tamping. Use equipment and procedures for consolidation of concrete in accordance with the applicable recommended practices of ACI 309. Vibration of forms and reinforcing will not be permitted.

5. Vibrators shall have a frequency of at least 8,000 vpm, with amplitude required to consolidate the concrete in the section being placed. At least one stand-by vibrator in operable condition shall be at the placement site prior to initiating placement of the concrete.

6. Do not use vibrators to transport concrete inside of forms. Insert and withdraw vibrators vertically at uniformly spaced locations not farther than the visible effectiveness of the machine. Place vibrators to rapidly penetrate the layer of concrete and at least 6 inches into the preceding layer. Do not insert vibrators into lower layers of concrete that have begun to set. At each insertion, limit the duration of vibration to the time necessary to consolidate the concrete and complete embedment of reinforcement and other embedded items without causing segregation of the mix.

7. The forms shall contain sufficient windows or be limited in height to allow visual observation of the concrete and the vibrator operators shall be required to see the concrete being consolidated to ensure good quality workmanship or the CONTRACTOR shall have a person who is actually observing the vibration of the concrete at all times and advising the vibrator operators of any changes need ed to assure complete consolidation.

8. Do not place concrete in beam and slab forms until the concrete previously placed in columns and walls is no longer plastic.

9. Force concrete under pipes, sleeves, openings and inserts from one side until visible from the other side to prevent voids.

D. Placing Concrete Slabs and Footings:

1. Deposit and consolidate concrete in a continuous operation, within the limits of construction joints, until the placing of a panel or section is completed.

2. Consolidate concrete during placing operations using mechanical vibrating equipment, so that concrete is thoroughly worked around reinforcement and other embedded items and into corners.

3. Consolidate concrete placed in beams and girders of supported slabs, and against bulkheads of slabs on ground, as specified for formed concrete structures.

4. Bring surfaces to the correct level. Smooth the surface, leaving it free of humps or hollows. Do not sprinkle water on the plastic surface. Do not disturb the surfaces prior to beginning finishing operations.

E. Quality of Concrete Work:

03 30 03-9
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Make all concrete solid, compact and smooth, and free of laitance, cracks and cold joints.

2. All concrete for liquid retaining structures, and all concrete in contact with earth, water, or exposed directly to the elements shall be watertight.

3. Cut out and properly replace to the extent ordered by ENGINEER, or repair to the satisfaction of ENGINEER, surfaces which contain cracks or voids, are unduly rough, or are in any way defective. Thin patches or plastering will not be acceptable.

4. Repair all leaks through concrete, and cracks, holes or other defective concrete in areas of potential leakage and make watertight.

5. Repair, remove, and replace defective concrete as ordered by ENGINEER at no additional cost to CITY.

F. Cold Weather Placing:

1. Protect all concrete Work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures, in compliance with the requirements of ACI 306 and as herein specified.

2. When the air temperature has fallen to or may be expected to fall below 40°F, provide adequate means to maintain the temperature, in the area where concrete is being placed, at between 50°F and 70°F for at least seven days after placing. Provide temporary housings or coverings including tarpaulins or plastic film. Maintain the heat and protection, if necessary, to ensure that the ambient temperature does not fall more than 30°F in the 24 hours following the seven -day period. Avoid rapid dry-out of concrete due to overheating, and avoid thermal shock due to sudden cooling or heating.

3. When air temperature has fallen to or is expected to fall below 40°F, uniformly heat all water and aggregates before mixing as required to obtain a concrete mixture temperature of not less than 55°F and not more than 85°F at point of placement.

4. Do not use frozen materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. Ascertain that forms, reinforcing steel, and adjacent concrete surfaces are entirely free of frost and ice before placing concrete.

5. When temperatures are expected to be below 32oF the night before the concrete is placed, then all reinforcing steel, forms and the ground shall be preheated, for a minimum of 12 hours, under a minimum temperature of 50 oF.

6. Do not use salt and other materials containing antifreeze agents or chemical accelerators, or set -control admixtures, unless approved by ENGINEER, in mix designs.

7. Weather predictions made by the nearest NOAA station, and corrected for the local elevation and environmental conditions, may be used to determine whether cold weather protection shall be required. Thermometers will be used by ENGINEER and these readings shall determine whether cold weather protection shall be required and whether cold weather protection is adequate.

G. Hot Weather Placing:

1. When hot weather conditions exist as any combination of high air temperature, low relative humidity and wind velocity that would seriously impair the quality and strength of concrete, place concrete as recommended by ACI 305 and as herein specified.

2. Cool ingredients before mixing to maintain concrete temperature at time of placement below 85°F. No concrete shall be placed if its temperature exceeds 90°F.

03 30 03-10
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Mixing water may be chilled, or chopped ice may be used, or liquid nitrogen may be added. Ice, when introduced into the mixer shall be in such form that it will be completely melted and dispersed throughout the mix at the completion of the mixing time. The addition of ice shall not increase the specified water to cement ratio.

3. Cover reinforcing steel with water-soaked burlap if it becomes too hot, so that the steel temperature will not exceed the ambient air temperature immediately before embedment in concrete.

4. Thoroughly wet forms before placing concrete. Forms shall be free of standing water when concrete is placed.

5. Do not use set-control admixtures, unless approved by ENGINEER in mix designs.

6. Fog spray shall be used during finishing operations whenever necessary to avoid surface plastic shrinkage cracking. Fog spray shall also be used after finishing and before the specified curing is commenced to avoid surface plastic shrinkage cracking.

7. Obtain ENGINEER'S approval of other methods and materials proposed for use.

H. Removal of Forms:

1. The CONTRACTOR shall be responsible for all damage resulting from improper and premature removal of forms. Satisfy all applicable OSHA requirements with regard to safety of personnel and property.

2. Forms and shoring for elevated structural slabs or beams shall remain in place in accordance with ACI 318, Chapter 6, and until the concrete has reached a compressive strength equal to the specified 28 -day compressive strength as determined by test cylinders . Removal of all supports prior to obtaining adequate field cured cylinder results and reshoring shall not be permitted.

I. Backfill Against Walls:

1. Do not place backfill against walls until the concrete has obtained a compressive strength equal to the specified 28-day compressive strength. Where backfill is to be placed on both sides of the wall, the backfill shall be placed simultaneously on both sides to prevent differential pressures.

2. Since the walls of some structures are laterally restrained or supported by suspended slabs and/or slabs on grade and are not designed as cantilever retaining walls, the CONTRACTOR shall submit a schedule of wall shoring, bracing, and backfilling that is coordinated with the concrete curing, test cylinder reports and the design assumptions and obtain a review from the ENGINEER prior to proceeding.

J. Patching:

1. Patching of concrete shall provide an acceptable and structurally sound surface finish uniform in appearance or the CONTRACTOR shall upgrade the finish by other means at no additional cost.

2. Tie Holes: All tie holes, except where sealant is indicated, shall be filled with dry pack nonshrink grout. White cement shall be added as needed so the color of grout after curing matches the color of adjacent concrete. Tie holes shall be thoroughly sandblasted or roughened. Flush the patch area with water and allow to dry. Coat the surface of the existing concrete with an approved bonding agent prior to filling with nonshrink grout. Complete the repair in the time duration specified by the bonding agent manufacturer. The grout shall be rammed into place in thin layers and leveled to the plane of the surrounding concrete. Cure in accordance with the manufacturer’s recommendations.

03 30 03-11
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

3. Defective Areas: Remove all defective concrete such as honeycombed areas and rock pockets out to sound concrete. Small shallow holes caused by air entrapment at the surface of the forms shall not be considered defects unless the amount is so great as to be considered not the standard of the industry and due primarily of poor workmanship. If chipping is required, the edges shall be perpendicular to the surface.

Feather edges shall not be permitted. The defective area shall be filled with a nonshrink, nonmetallic, grout. Use an approved bonding agent on horizontal patches prior to placing nonmetallic, non shrink grout. Since some bonding agents may not be compatible for some vertical surface patching techniques, demonstrate all methods for repair of vertical surfaces using the actual materials, methods, and curing procedures required by the manufactures of the materials on the project site.

The CONTRACTOR shall consult with representatives of the bonding agent manufacturer and the nonshrink grout manufacturer, and these representatives shall be onsite and assist in the demonstration.

4. Blockouts at Pipes or Other Penetrations: Conform to details shown or submit proposed blockouts for review. Use nonshrink, nonmetallic grout.

3.4 FINISH OF FORMED SURFACES
A. Rough Form Finish:

1. Standard rough form finish is with concrete surface having the texture imparted by the form material, with tie holes and defective areas repaired and patched with mortar of 1 part cement to 1½ parts sand & all fins and other projections exceeding ¼ inches in height rubbed down or chipped off.

2. Use rough form finish for the following:
a. Exterior vertical surfaces up to 1 foot below grade. b. Interior exposed vertical surfaces of liquid containers up to 1 foot below liquid level.
c. Interior and exterior exposed beams and undersides of slabs. d. Other areas shown.

B. Smooth Form Finish:

1. Produce smooth form finish (Class A, as defined by ACI -347) by selecting form materials that will impart a smooth, hard, uniform texture. Arrange panels in an orderly and symmetrical manner with a minimum of seams. Repair and patch defective areas as above with all fins or other projections completely removed and smoothed.

2. Use smooth form finish for surfaces that are to be covered with a coating material.

The material may be applied directly to the concrete or may be a covering bonded to the concrete such as waterproofing, damp proofing, painting or other similar system.

C. Smooth Rubbed Finish:

1. Provide smooth, rubbed finish to concrete surfaces which have received smooth form finish as follows:
a. Rubbing of concrete surfaces not later than the day after form removal. b. Moistening of concrete surfaces and rubbing with carborundum brick or other abrasive until a uniform color and texture is produced. Do not apply cement grout other than that created by the rubbing process.

2. Except where surfaces have been previously covered as specified above, use smooth rubbed finish for the following:

03 30 03-12
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

a. Interior exposed walls and other vertical surfaces.
b. Exterior exposed walls and other vertical surfaces down to 1 foot below grade. c. Interior and exterior horizontal surfaces, except exterior exposed slabs and steps. d. Interior exposed vertical surfaces of liquid containers down to 1 foot below liquid level.
e. Other areas shown.

D. Sack Rubbed Finish:

1. Before applying the sack -rubbed finish, fill all tie rod holes and large cavities and remove or correct all fins and irregularities as specified in the Smooth Rubbed Finish.

2. Produce a sack rubbed finish by rubbing the concrete surface with a clean rubber float or wad of burlap and mortar. Use mortar made of premixed sacking mortar or one part portland cement and 1.5 parts, by volume, clean sand passing a No. 16 sieve, mixed with sufficient water to provide a consistency equal to that of a thick cream. Use the same type and brand cement as used in the concrete or colored premixed sacking mortar . The mortar finish color shall match the surrounding concrete. If necessary, blend white cement into the mortar to match the surrounding concrete surface.

3. Thoroughly wet the surface of the concrete and then perform sack rubbing while the surface is damp but not wet. Thoroughly rub the mortar over the area with a rubber float or wad of burlap, filling all pits. While the mortar is still plastic in the pits, rub the surface with the rubber float or burlap using a dry mix of the above proportions, removing all excess plastic material and placing enough dry material in the pits to stiffen and solidify the mortar, then finish the mortar fillings flush with the surface. At the end of the rubbing, no mortar or material shall remain on the surface other than that within the pits.

4. Ensure the completed surface is free of surface voids and blemishes, and is uniform in appearance and texture, except for the difference in texture between the filled voids and the remainder of the surface.

5. A thorough wash -down with stiff bristle brushes shall follow the final bagging or stoning operation. No extraneous materials shall remain on the surface of the wall.

The wall shall be sprayed with a fine fog spray periodically to maintain a continually damp condition for at least 3 days after the application.

6. Use a sack rubbed finish for the following areas or as indicated in the Drawings:
a. Interior exposed walls and other vertical surfaces.
b. Exterior exposed walls and other vertical surfaces down to 1 foot below grade. c. Interior and exterior horizontal surfaces, except exterior exposed slabs and steps. d. Or other areas shown.

E. Related Unformed Surfaces:

1. At tops of walls, horizontal offsets, and similar unformed surfaces occurring adjacent to formed surfaces, strike off smooth and finish with a texture matching the adjacent formed surfaces. Continue the final surface treatment of formed surfaces uniformly across the adjacent unformed surfaces, unless otherwise shown.

3.5 MONOLITHIC SLAB FINISHES
A. Float Finish:

1. After placing concrete slabs, do not work the surface further until ready for floating.

Begin floating when the surface water has disappeared or when the concrete has

03 30 03-13
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

stiffened sufficiently. Check and level the surface plane to a tolerance not exceeding ¼ inch in 10 feet when tested with a 10-foot straightedge. Cut down high spots and fill all low spots. Uniformly slope surface to drains as shown. Immediately after leveling, refloat the surface to a uniform, smooth, granular texture.

2. Use float finish for the following:
a. Interior horizontal surfaces of liquid containers, except those to receive grout topping.
b. Exterior below grade horizontal surfaces.
c. Surfaces to receive additional finishes, except as shown or specified.

B. Trowel Finish:

1. After floating, begin the first trowel finish operation using a power -driven trowel.

Begin final troweling when the surface produces a ringing sound as the trowel is moved over the surface.

2. Consolidate the concrete surface by the final hand troweling operation. Finish shall be free of trowel marks, uniform in texture and appearance, and with a surface plane tolerance not exceeding 1/8 inch in 10 feet when tested with a 10-foot straight edge.

Grind smooth surface defects that would telegraph through applied floor covering system.

3. Use trowel finish for the following:
a. Interior exposed slabs, unless otherwise shown or specified. b. Slabs to receive resilient floor finishes.

C. Non-Slip Broom Finish:

1. Immediately after trowel finishing, slightly roughen the concrete surface by brooming in the direction perpendicular to the main traffic route. Use fiber -bristle broom, unless otherwise directed. Coordinate the required final finish with ENGINEER before application.

2. Use Non-Slip Broom Finish for the following:
a. Exterior exposed horizontal surfaces subject to light foot traffic. b. Interior and exterior concrete steps and ramps.
c. Horizontal surfaces which will receive a grout topping or a concrete equipment base slab.

3.6 CONCRETE CURING AND PROTECTION
A. General:

1. Protect freshly placed concrete from premature drying and excessive cold or hot temperature and maintain without drying at a relatively constant temperature for the period of time necessary for hydration of the cement and proper hardening of the concrete.

2. Start initial curing after placing and finishing concrete as soon as free moisture and bleed water sheen has disappeared from the concrete surface. Keep concrete continuously moist during initial curing.

3. Begin final curing procedures immediately following initial curing and before the concrete has dried. The total curing duration shall not be less than ten (10) days. For concrete sections over 30 -inch thick, continue curing for an additional seven (7) days, minimum. Avoid rapid drying at the end of the final curing period.

B. Use one of the following methods as approved by ENGINEER:

03 30 03-14
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Walls:
a. Method 1: Leave concrete forms in place and keep entire surfaces of forms and exposed concrete surfaces wet for the entire curing duration. If forms are loosened and the contact between the concrete surface and forms is broken then the entire wall shall be wet cured.
b. Method 2: Continuously sprinkle or fog with water 100 percent of the exposed surfaces for the curing duration immediately after removal of forms. c. Method 3: When approved by ENGINEER and as noted below, apply curing compound immediately after removal of forms.

2. Slab and Curbs:
a. Method 1: Protect surface by water ponding for the entire curing duration. b. Method 2: Cover concrete surfaces and exposed edges with the specified absorptive cover, thoroughly saturating the cover with water, and keeping the absorptive cover continuously wet with sprinklers or porous hoses during the curing duration. Lap adjacent absorptive cover sections 3-inches minimum. c. Method 3: Cover the concrete surfaces and exposed edges with the specified moisture-retaining cover during the curing duration. Seal edges and seams with waterproof tape, adhesive or sand berm. Water must be introduced between the moisture-retaining cover and the concrete surface whenever moist drops cannot be detected on the concrete side of the cover or the concrete surface is noticeably dry.
d. Method 4: Cover all exposed surfaces with 1 -inch minimum layer of wet sand, earth, or sawdust and keep continuously wet for the curing duration. e. Method 5: Continuously sprinkle or fog exposed surfaces for the curing duration. f. Method 6: When approved by ENGINEER and as noted below, apply liquid curing compound immediately after final finishing when surface will no longer be damaged by traffic necessary to apply curing compound.

C. Liquid curing compound:

1. Apply the specified curing compound to concrete surfaces when permitted by ENGINEER. Slabs to receive terrazzo floors, concrete/grout topping or ceramic tile, concrete of water bearing structures, and concrete that will receive coatings shall not be cured with liquid curing compound. The compounds shall be applied by power spray equipment in accordance with the manufacturer's directions. Recoat areas, which are subjected to heavy rainfall within 3 hours after initial application. Maintain the continuity of the coating and repair damage to the coat during the entire curing period. Remove curing compound from exposed surfaces at the end of the curing duration. For concrete surfaces, which will be in contact with potable water, the manufacturer shall certify that the curing compound used is NSF 61 approved.

D. Temperature of Concrete During Curing:

1. When the nighttime low temperature may drop to 40°F or below, maintain the concrete temperature between 50°F and 70°F continuously through out the curing period, by heating, covering, insulation or housing as required.

2. When the daytime high temperature may rise to 90°F or above, maintain the concrete temperature at a minimum and reduce temperature variations by providing moist curing continuously for the concrete curing period.

3. During either of the conditions specified above, the minimum curing time shall be 10 days (240 hours), after which coverings, housings, and insulation shall remain on the

03 30 03-15
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

work for an additional 3 days, to allow gradual temperature equalization with the atmosphere.

E. Protection from Mechanical Injury: During the curing period, protect concrete from damaging mechanical disturbances including load stresses, heavy shock, excessive vibration, and from damage caused by rain or flowing water. Protect all finished concrete surfaces from damage by subsequent construction operations.

3.7 FIELD QUALITY CONTROL
A. The CONTRACTOR will employ a testing laboratory to perform field quality control testing. ENGINEER will direct the number of tests and cylinders required. Furnish all necessary assistance required by ENGINEER.

B. Quality Control Testing During Construction:

1. Perform sampling and testing for field quality control during the placement of concrete, as follows:
a. Sampling Fresh Concrete: ASTM C172.
b. Slump: ASTM C143; one test for each concrete load at point of discharge; and one for each set of compressive strength test specimens. c. Air Content: ASTM C231; one for the first concrete load, and one for every two concrete loads thereafter, or when required by an indication of change. Adjust mix if test results are unsatisfactory and resubmit for ENGINEER'S approval. d. Compressive Strength Tests: ASTM C39; one set of 4 standard compression cylinders for each 100 cubic yards or fraction thereof, of each mix design placed in any one day; 1 specimen tested at 7 days, and 2 specimens tested at 28 days, 1 held. Cast, store and cure specimens as specified in ASTM C31. 1) Adjust mix if test results are unsatisfactory and resubmit for ENGINEER'S approval.
2) Concrete that does not meet the strength requirements is subject to rejection and removal from the Work, or to other such corrective measures as directed by ENGINEER, at the expense of CONTRACTOR.
e. Concrete Temperature: Test each time a slump test is made.

2. Where questionable field conditions may exist during placing concrete or immediately thereafter, strength tests of specimens cured under field conditions will be required by ENGINEER to check the adequacy of curing and protecting of the concrete placed.

Specimens shall be molded at the same time and from the same samples as the laboratory cured specimens.
a. Provide improved means and procedures for protecting concrete when the 28-day compressive strength of field -cured cylinders is less than 85% of companion laboratory-cured cylinders.
b. When laboratory -cured cylinder strengths are appreciably higher than the minimum required compressive strength, field-cured cylinder strengths need not exceed the minimum required compressive strength by more than 500 psi even though the 85 percent criterion is not met.

3. The testing laboratory shall submit certified copies of test results directly to ENGINEER and CONTRACTOR after tests are made.

C. Evaluation of Quality Control Tests:

03 30 03-16
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Do not use concrete delivered to the final point of placement that has slump or temperature outside the specified values, nor that which is older than specified in section 3.2.

2. Compressive strength tests for laboratory -cured cylinders will be considered satisfactory if the averages of all sets of three consecutive compressive strength tests results equal or exceed the 28 day design compressive strength of the type or class of concrete; and, no individual strength test falls below the required compressive strength by more than 500 psi.

3. If the compressive strength tests fail to meet the minimum requirements specified, the concrete represented by such tests will be considered deficient in strength and subject to replacement, reconstruction or to other action approved by ENGINEER.

D. Testing Concrete Structure for Strength:

1. When there is evidence that the strength of the in -place concrete does not meet specification requirements, provide the services of a concrete testing service to take cores drilled from hardened concrete for compressive strength determination at no additional expense to CITY. Provide tests complying with ASTM C42 and the following:
a. Take at least three (3) representative cores from each member or suspect area at locations directed by ENGINEER.
b. Strength of concrete for each series of cores will be considered satisfactory if their average compressive strength is at least 85% and no single core is less than 75% of the 28 day required compressive strength.
c. Report test results, in writing, to ENGINEER on the same day that tests are made.

Include in test reports the Project identification name and number, date, name of CONTRACTOR, name of concrete testing service, location of test core in the structure, type or class of concrete represented by core sample, nominal maximum size aggregate, design compressive strength, compression breaking strength and type of break (corrected for length -diameter ratio), direction of applied load to core with respect to horizontal plane of the concrete as placed, and the moisture condition of the core at time of testing.

2. Fill core holes solid with non-shrink, high strength grout, and finish to match adjacent concrete surfaces.

E. Water Leakage Tests for All Water-Holding Structures:

1. All water-holding structures shall be subjected to leakage tests after the concrete has been cured and obtained its design strength, and before backfill, brick facing, or other work which will cover the concrete surfaces of the walls is begun. Water leakage tests shall be conducted by the CONTRACTOR as follows:
a. All water-holding structures shall be filled with water to the maximum liquid level shown on the Drawings prior to leak testing at a rate less than 4 ft/hr. After these structures have been kept full for 3-days, it will be assumed for the purpose of the test that the absorption of moisture by the concrete in the basin is complete.

All valves and gates to the structure shall then be closed and the change in water surface measured over a 48-hour period. The vertical distance to the water surface shall be measured to within 1/16 -inch from a fixed point on the containment structure above the water surface. Measurements shall be recorded at 24-hour intervals.
b. During the test period, all exposed portions of the structure shall be examined for dampness or leaks and all visible leaks or damp spots shall be marked; such

03 30 03-17
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

leaks or damp spots shall be later patched or corrected in a manner acceptable to the ENGINEER prior to additional leakage testing. If the drop in water surface in the 48-hour period exceeds 0.05% of the normal volume of liquid contained in the water-holding structure, after accounting for evaporation, precipitation and temperature in open basins, or if damp spots or any seepage is present on the walls or other areas exposed to view where moisture can be picked up on a dry hand, the leakage shall be considered excessive and the leakage test will be considered to have failed. A floating, restrained, partially filled, calibrated, open container for evaporation and precipitation measurement should be positioned in open containment structures, and the water level in the container recorded.

Determination of evaporation by a shallow pan -type measuring device is discouraged as the heating of the bottom of a shallow pan can cause accelerated evaporation of water when compared with that taking place from a deep containment structure.
1) Wet areas on top of wall footings shall not be considered cause of a qualitative failure of the leakage test unless the water can be observed to be flowing.
c. If the leakage is excessive, and if damp spots and observed seepage is present on exposed surfaces, the water-holding structure shall be drained, all leaks and damp spots previously marked shall be patched, and the necessary repairs made, and the basin shall be retested. The CONTRACTOR’s method of repair shall be subject to the requirements of these specifications and submitted for review and approval by the ENGINEER.
d. The water-holding structure shall then be refilled and again tested for leakage and this testing and repair process shall be repeated as many times as necessary until the leakage test passes. This process shall be continued until the drop in water surface in specified test period with the basin full is less than the quantity specified above and all damp spots and seepage disappears when the structures are full of water. All repairs of faulty workmanship and materials, and additional tests, shall be made by the CONTRACTOR in an acceptable manner, at no additional cost to the CITY. Both the correction for excessive leakage and the removal of the damp or wet spots on exposed surfaces shall be required to pass the leakage test.
e. The purpose of this test is to determine the integrity of the finished concrete and to show that the exposed wall surfaces are visually acceptable. Therefore, all other equipment, e.g., stop gates, sluice gates, etc. or temporary bulkheads , should be made watertight prior to the test.
f. As an alternative to having watertight bulkheads, gates or valves, the CONTRACTOR shall accurately measure the leakage through gates, valves, and bulkheads with methods acceptable to the ENGINEER.
g. An assumed leakage through gates and valves based on the manufacturer’s recommendations is not acceptable.

3.8 MISCELLANEOUS CONCRETE ITEMS
A. Filling-In: Fill-in holes and openings left in concrete structures for the passage of work by other contractors, unless otherwise shown or directed, after the work of other contractors is in place. Mix, place and cure concrete as herein specified, to blend with in-place construction. Provide all other miscellaneous concrete filling shown or required to complete the Work.

03 30 03-18
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Curbs:

1. Provide monolithic finish to interior curbs by stripping forms while concrete is still green and steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.

2. Exterior curbs shall have rubbed finish for vertical surfaces and a broomed finish for top surfaces.

C. Equipment Bases:

1. Unless specifically shown otherwise, provide concrete bases for all pumps and other equipment. Construct bases to the dimensions shown, or as required to meet manufacturers requirements and drawing elevations. Where no specific elevations are shown, bases shall be 6 -inches thick and extend 3 -inches outside the metal equipment base or supports. Bases to have smooth trowel finish, unless a special finish such as terrazzo, ceramic tile or heavy duty concrete topping is required. In those cases, provide appropriate concrete finish.

2. Include all concrete equipment base work not specifically included under other Sections.

3. In general, place bases up to 1-inch below the metal base. Properly shim equipment to grade and fill 1-inch void with non-shrink grout as specified in Section 03 60 03, Grout.

D. Installation of embedded items

1. Install all embedded items prior to concrete placement, or, if necessary, as soon after concrete placement as possible, before concrete is set.

2. Use temporary support and bracing to keep embedded items in place while concrete cures.

3. Protect all embedded items from damage during concrete installation.

3.9 CONCRETE REPAIRS
A. Repair of Formed surfaces:

1. Repair exposed -to-view formed concrete surfaces that contain defects which adversely affect the appearance of the finish. Surface defects that require repair include color and texture irregularities, cracks, spalls, air bubbles, honeycomb, rock pockets, and holes left by the rods and bolts; fins and other projections on the surface; and stains and other discolorations that cannot be removed by cleaning.

2. Repair concealed formed concrete surfaces that may contain defects that adversely affect the durability of the concrete. Surface defects that require repair include cracks in excess of 0.01-inch wide, cracks of any width and other surface deficiencies which penetrate to the reinforcement or completely through non -reinforced sections, honeycomb, rock pockets, holes left by tie rods and bolts, and spalls except minor breakage at corner.

3. Repair structural cracks and cracks in water-holding structures.

B. Method of Repair of Formed Surfaces:

1. Repair and patch defective areas with cement mortar immediately after removal of forms and as directed by ENGINEER.

2. Cut out honeycomb, rock pockets, voids over ½-inch diameter, and holes left by tie rods and bolts, down to solid concrete but, in no case, to a depth of less than 1-inch.

Make edges of cuts perpendicular to the concrete surface. Before placing the cement

03 30 03-19
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

mortar, thoroughly clean, dampen with water, and brush-coat the area to be patched with the specified bonding agent.
a. For exposed-to-view surfaces, blend white portland cement and standard portland cement so that, when dry, the patching mortar color will match the color of the surrounding concrete. CONTRACTOR shall impart texture to repaired surfaces to match texture of existing adjacent surfaces. Provide test areas at inconspicuous locations to verify mixture, texture and color match before proceeding with the patching. Compact mortar in place and strike off slightly higher than the surrounding surface.

3. Cracks which require repair shall be pressure grouted, epoxy injected, using one of the following . Apply in accordance with the manufacturer's directions and recommendations.
a. Sikadur 35, Hi-Mod L.V. and Sikadur 31, Hi -Mod Gel, as manufactured by Sika Corporation Company.
b. Euco Epoxy #452 Epoxy System, as manufactured by The Euclid Chemical Company.
c. Or approved equal.

4. Fill holes extending through concrete by means of a plunger -type gun or other suitable device from the least exposed face, using a flush stop held at the exposed face to ensure completely filling.

5. Sandblast exposed -to-view surfaces that require removal of stains, grout accumulations, sealing compounds, and other substances marring the surfaces. Use sand finer than No. 30 and air pressure from 15 to 25 psi.

C. Repair of Unformed Surfaces:

1. Test unformed surfaces, such as monolithic slabs, for smoothness and to verify surface plane to the tolerances specified for each surface and finish. Correct low and high areas as herein specified.

2. Test unformed surfaces sloped to drain for trueness of slope, in addition to smoothness, using a template having the required slope. Correct high and low areas as herein specified.

3. Repair finish of unformed surfaces that contain defects which adversely affect the durability of the concrete. Surface defects, as such, include crazing, cracks in excess of 0.01-inch wide or which penetrate to the reinforcement or completely through non-reinforced sections regardless of width, spalling, popouts, honeycomb, rock pockets, and other objectionable conditions.

4. Repair structural cracks and cracks in water-holding structures.

D. Methods of Repair of Unformed Surfaces:

1. Correct high areas in unformed surfaces by grinding, after the concrete has cured sufficiently so that repairs can be made without damage to adjacent areas.

2. Correct low areas in unformed surfaces during, or immediately after completion of surface finishing operations by cutting out the low areas and replacing with fresh concrete. Finish repaired areas to blend into adjacent concrete. Apply in accordance with the manufacturer's directions and recommendations. Use one of the following:
a. Euco Poly-Patch, as manufactured by The Euclid Chemical Company. b. Sikatop 122, as manufactured by Sika Corporation.
c. Or approved equal.

3. Repair defective areas, except random cracks and single holes not exceeding 2-inch diameter, by cutting out and replacing with fresh concrete. Remove defective areas

03 30 03-20
Cast-in-Place Concrete
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

to sound concrete with clean, square cuts, and expose reinforcing steel with at least ¾-inch clearance all around. Dampen all concrete surfaces in contact with patching concrete and brush with the specified bonding agent. Place patching concrete before grout takes its initial set. Mix patching concrete of the same materials and proportions to provide concrete of the same type or class as the original adjacent concrete. Place, compact and finish as required to blend with adjacent finished concrete. Cure in the same manner as adjacent concrete.

4. Repair isolated random cracks, as approved be ENGINEER, and single holes not over 2-inch diameter, by the dry -pack method. Groove the top of cracks, and cut out holes to sound concrete and clean of dust, dirt and loose particles. Dampen all cleaned concrete surfaces and brush with the specified bonding agent. Place dry-pack before the cement grout takes its initial set. Mix dry -pack, consisting of 1 part portland cement to 2 parts fine aggregate passing a No. 16 mesh sieve, using only enough water as required for handling and placing. Compact dry -pack mixture in place and finish to match adjacent concrete. Keep patched areas continuously moist for not less than 72 hours.

5. Cracks which extend through the full member section, or any cracks determined by ENGINEER to require pressure grouting repair, shall be pressure grouted , epoxy injected, using one of the following . Apply in accordance with the manufacturer's directions and recommendations.
a. Sikadur 35, Hi-Mod L.V. and Sikadur 31, Hi -Mod Gel, as manufactured by Sika Corporation.
b. Euco Epoxy #452 Epoxy System, as manufactured by The Euclid Chemical Company.
c. Or approved equal.

6. Assure that surface is acceptable for flooring material to be installed in accordance with manufacturer's recommendations.

E. Other Methods of Repair:

1. Repair methods not specified above may be used if approved by ENGINEER.

++ END OF SECTION ++

03 60 03-1
Grout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 03 60 03
GROUT
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes epoxy, non -metallic, non-shrink, and ordinary Portland cement -sand grouts.

1.2 REFERENCES
A. American Society for Testing and Materials (ASTM)

1. ASTM C33, Standard Specification for Concrete Aggregates.

2. ASTM C150, Standard Specification for Portland Cement.

3. ASTM C595, Standard Specification for Blended Hydraulic Cements.

4. ASTM C1107, Standard Specification for Packaged Dry, Hydraulic-Cement Grout.

1.3 SYSTEM DESCRIPTION
A. Furnish ordinary cement-sand grout for the following:

1. Foundation grout.

2. Construction joint grout.

3. As shown in the Drawings.

B. Furnish non-shrink, non-metallic grout for the following:

1. Equipment bases, 25 hp or less.

2. Base plates.

3. Guardrail and railings.

4. Through-bolt and form tie openings.

5. As shown in the Drawings.

C. Furnish epoxy grout for the following:

1. Equipment bases, 26 hp or more and/or sole plates with vibration, thermal movement, etc.

2. Blockouts for gate guides.

3. Retrofit waterstop installation.

4. As shown in the Drawings.

1.4 SUBMITTALS
A. Product Data:

1. Manufacturer's specifications and installation instructions for all proprietary materials.

2. Proposed method for keeping existing concrete surfaces wet prior to placing grout.

3. Forming method for fluid grout placements.

4. Curing method for grout.

B. Laboratory Test Reports and Certificates:

03 60 03-2
Grout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. For proprietary materials, submit copies of reports on quality control tests.

2. Submit certification that materials meet specification requirements for nonproprietary materials.

3. For ordinary cement-sand grout, copies of grout mix design and laboratory strength test reports.

1.5 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Delivery of Materials: Deliver grout materials from manufacturers in unopened containers and bearing intact manufacturer's labels.

B. Storage of Materials: Store grout materials in a dry shelter and protected from moisture.

PART 2 - PRODUCTS

2.1 MATERIALS
A. High-Strength Epoxy Grout.

1. Use 100% solids , prepackaged, solvent -free, moisture insensitive, high-strength epoxy grout.

2. Product and Manufacturer: Provide one of the following:
a. E3-HP, as manufactured by The Euclid Chemical Company. b. Sikadur 42 Grout Pak, as manufactured by Sika Corporation. c. Five Star HP Epoxy Grout by Five Star Products, Incorporated. d. Or approved equal.

B. Non-shrink, Non-metallic Grout:

1. Prepackaged non -staining cementi tious grout which shall meet the minimum requirements of ASTM C1107 and requiring only the addition of water at the jobsite.

2. Product and Manufacturer: Provide one of the following:
a. NS, as manufactured by The Euclid Chemical Company.
b. Five Star Grout, as manufactured by Five Star Products, Incorporated. c. Sika Grout 212, as manufactured by Sika Corporation. d. Or approved equal.

C. Ordinary Cement-Sand Grout: Prepare design mix for ordinary cement grout.

1. Cement: Portland cement, ASTM C150, Type II; or blended hydraulic cement, ASTM C595, Type 1P.

2. Aggregates: ASTM C33 and as herein specified.
a. Do not use aggregates containing soluble salts or other substances such as iron sulfides, pyrite, marcasite, ochre, or other materials that can cause stains on exposed concrete surfaces.
b. Fine Aggregate: Clean, sharp, natural sand, free from loam, clay, lumps or other deleterious substances.
1) Dune sand, bank run sand and manufactured sand are not acceptable. c. Coarse Aggregate: Coarse aggregate not permitted.

3. Admixtures: Provide admixtures produced by established reputable manufacturers and use in compliance with the manufacturer's printed instruction. Do not use admixtures that have not been incorporated and tested in the accepted mixes, unless

03 60 03-3
Grout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

otherwise authorized in writing by ENGINEER. Refer to Section 03 30 03, Cast-In- Place Concrete, for additional admixture requirements.

4. Proportioning and Design of Mixes: Mixes are subject to the following limitations:
a. Specified 28-day Compressive Strength: 4,000 psi.
b. Minimum amount of water necessary for the mixture to flow under its own weight.
c. Fine Aggregate meeting ASTM C33.
d. Air Content Percentage: ±1.5%.
e. Minimum Cement Content in Pounds per Cubic Yard: 658. f. Slump at point of placement: 5 inch ±1 inch.

5. Proportion mix by either laboratory trial batch or field experience methods, using materials to be employed on the Project for grout required. Comply with ACI 211.1 and provide a complete report, from an independent testing laboratory, to ENGINEER, at least 30 days prior to start of Work. Do not begin grout production until ENGINEER has approved mix.

6. Laboratory Trial Batches: When laboratory trial batches are used to select grout proportions, prepare test specimens, and conduct strength tests as specified in ACI 301, Chapter 3 - Proportioning.

7. Field Experience Method: When field experience methods are used to select grout proportions, establish proportions as specified in ACI 301, Chapter 4.

PART 3 - EXECUTION

3.1 INSPECTION
A. Examine the substrate and conditions under which grout is to be placed with installer and notify ENGINEER, in writing, of unsatisfactory conditions. Do not proceed with the Work until unsatisfactory conditions have been corrected in a manner acceptable to ENGINEER.

3.2 INSTALLATION
A. General:

1. Mix, p lace and cure grout as shown and in accordance with manufacturer's instructions. If manufacturer's instructions conflict with the Specifications, do not proceed until ENGINEER provides clarification.

2. Manufacturers of proprietary products shall make available upon 72 hours notification the services of a qualified, full time employee to aid in assuring proper use of the product under job conditions. The cost of this service, if any, shall be borne by CONTRACTOR.

3. When placing grout conform to temperature and weather limitations.

B. Through-bolt and form-tie holes: Fill space with dry pack dense grout hammered in with steel tool and hammer. Coordinate dry pack dense grout application with bonding agent.

C. Columns, Beams and Equipment Bases: Prepare concrete surface by sandblasting, chipping, or by mechanical means to remove any soft material prior to setting base plates and machinery. After shimming columns, beams and equipment indicated to be grouted on the plans to proper grade, securely tighten anchor bolts. Properly form around the base plates allowing sufficient room around the edges for placing the grout.

03 60 03-4
Grout
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Adequate depth between the bottom of the base plate and the top of concrete base must be provided to assure that the void is completely filled with grout.

D. Guardrails and Railings: After posts and rails have been properly inserted into holes or sleeves, fill the annular space between posts and cast-in-place sleeves and/or below base plates with non-shrink grout. Bevel grout at juncture with post so that moisture flows away from posts.

E. Construction Joints: Ordinary cement-sand grout may be used in place of mortar over the contact surface of the old concrete at the interface of horizontal construction joints.

F. Curing: Cure all grout in accordance with manufacturer’s written instructions. Wet cure ordinary cement-sand grout and non-shrink non-metallic grout for a minimum of three (3) days unless directed otherwise by the ENGINEER.

++ END OF SECTION ++

05 05 06-1
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 05 05 06

ANCHORS, INSERTS, AND DOWELS
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes all post-installed anchors and inserts required to anchor parts of the Work to supporting concrete or masonry construction, and plaster. This Section also includes adhesives for anchoring reinforcing dowels into existing concrete.

1.2 REFERENCES
A. American Society for Testing and Materials

1. ASTM A36, Standard Specification for Carbon Structural Steel.

2. ASTM A320, Standard Specification for Alloy -Steel and Stainless Steel Bolting for Low-Temperature Service.

3. ASTM D746, Standard Test Method for Brittleness of Temperature of Plastics and Elastomers by Impact

4. ASTM D1505, Standard Test Method for Density of Plastics by the Density-Gradient Technique

5. ASTM D1525, Standard Test Method for Vicat Softening Temperature of Plastics B. 2018 International Building Code (IBC)
C. American Concrete Institute (ACI)

1. ACI 355.2, Qualification of Post-Installed Mechanical Anchors in Concrete

2. ACI 355.4, Qualification of Post-installed Adhesive Anchors in Concrete

1.3 SYSTEM DESCRIPTION
A. Provide the size, type, and length of anchor shown on the drawings or, if not shown, as specified in the detailed sections of these specifications.

B. When the size, length or load carrying capacity of an anchor bolt, expansion anchor, toggle bolt, or concrete insert is not shown or specified, provide the size, length and capacity required to carry the design load times a minimum safety factor of 4.

C. For equipment anchors, if the design load is not specified by the manufacturer, provide anchors of diameter no less than the diameter of the hole minus 3/16 inch. When the design load is not specified by the manufacturer, provide structural calculations .

1.4 SUBMITTALS
A. Product Data : Submit for approval copies of material certification, manufacturer's specifications, load tables, dimension diagrams and installation instructions for the devices.

05 05 06-2
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Installer’s Qualifications: When installing adhesive anchors subject to sustained tension loading or when specifically noted in the Drawings, submit for approval copies of the installer’s qualifications certified by the ACI/CRSI Adhesive Anchor Installer Certification program.

1.5 QUALITY ASSURANCE
A. Post-installed concrete anchors shall be ICC approved for seismic applications in cracked concrete and prequalified in accordance with ACI 355.2 or ACI 355.4.

PART 2 - PRODUCTS

2.1 ANCHOR BOLTS
A. Non-submerged Use in areas of wet use, washdown areas, or areas outside heated buildings:

1. Stainless steel Type 316, unless otherwise shown.

2. Diameter, Length and Bend Dimensions: As required by equipment or machinery manufacturer. Unless otherwise required, provide 3/4 –inch minimum diameter by 12-inches long and other geometry as shown.

3. Furnish A320 nuts and washer s of same material for each bolt , unless otherwise shown.

4. Provide sleeves as required or as shown for location adjustment.

B. Submerged Use:

1. Submerged use is defined as any connection 1 foot 6 inches below the normal water surface elevation in a water holding basin.

2. As specified for nonsubmerged use, for equipment, machinery or other connections except as follows:
a. Coating of anchor bolt threads is not required.
b. Where threads are covered with fusion bonded coating, provide nut of proper size to fit and provide connection of equal strength to embedded bolt.

C. For anchoring fabricated metalwork , structural steel, or other components where connections will be protected or dry:

1. Galvanized Steel, 36 ksi, minimum.

2. Minimum Size: ¾-inch diameter by 12-inch long, unless otherwise shown.

3. At base plates with grout pads, furnish two nuts and two washers per bolt of same material as bolt, unless otherwise shown.

2.2 ANCHOR BOLT SLEEVE
A. High Density Polyethylene Plastic:

1. Single unit construction with deformed sidewalls such that the concrete and grout lock in place.

2. The top of the sleeve shall be self-threading to provide adjustment of the threaded anchor blot projection.

3. Material requirements shall conform to the following:
a. Plastic: High density polyethylene.

05 05 06-3
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

b. Density: 0.956, ASTM D1505.
c. Vicant Softening Point: 256oF, ASTM D1525
d. Brittleness Temperature: -180oF, ASTM D746
B. Fabricated Steel Sleeve:

1. Material: A36 steel.

2. Dimensions, welding, and sizes as shown.

2.3 STAINLESS STEEL FASTENERS LUBRICANT (ANTISEIZING) A. Provide for stainless steel nuts and machined bolts, anchor bolts, concrete anchors, and all other threaded fasteners.

B. Lubricant shall contain substantial amounts of molybdenum disulfide, graphite, mica, talc, or copper as manufactured by:

1. Loc Tite Co., Permatex.

2. Or equal

2.4 CONCRETE INSERTS
A. For vertical support of grating or floor plate, provide cast -in metal fabrications as shown.

B. Except as permitted below, or as otherwise shown, provide malleable iron inserts for hanging piping and conduit from concrete ceilings and soffits. Comply with Federal Specification WW -H-171-E (Type 18). Provide those recommended by the manufacturer for the required loading.

C. Obtain inserts in sufficient time so as not to delay concrete or masonry work.

D. Product and Manufacturer: Provide inserts of one of the following:

1. Figure 282, as manufactured by Anvil/Grinnell.

2. Sharktooth Insert, as manufactured by Hohmann and Barnard, Incorporated.

3. Or equal.

2.5 ADHESIVE (EPOXY) ANCHORS AND DOWELS
A. Provide adhesive anchors where specifically shown and where adhesive anchors are allowed. Unless otherwise shown, adhesive anchors are allowed for anchoring:

1. Supports for pipe, conduit, and electrical boxes, devices, and panels, on floors and walls

2. Handrails, guardrails, sunshades, stairs,

3. Fixtures and equipment on floors and walls, and

4. Single pipes and conduits <2 inch in diameter to ceilings and soffits.

B. Adhesive shall be epoxy resin. Vinylester resin anchors are NOT allowed.

C. Product and Manufacturer: Provide one of the following:

1. Installation to Concrete:
a. HIT-HY 200 as manufactured by Hilti, Inc.

05 05 06-4
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

b. SET-3G as manufactured by Simpson Strong-Tie, Inc.
c. Or approved equal meeting ACI 355.4.

2. Installation to solid-grouted Masonry:
a. HIT-HY 270 as manufactured by Hilti, Inc.
b. SET as manufactured by Simpson Strong-Tie, Inc.
c. Or approved equal.

2.6 EXPANSION ANCHORS
A. Provide expansion anchors only where specifically shown and where expansion anchors are allowed. Unless otherwise shown, and except as noted below, expansion anchors are allowed for anchoring:

1. Supports for pipe, conduit, and electrical boxes, devices, and panels, to floors and walls.

2. Handrails, guardrails, and sunshades.

3. Fixtures and equipment which have no moving parts, to floors and walls.

B. Expansion anchors are NOT allowed in any submerged or chemical containment areas.

C. Leveling nuts shall not be used with expansion anchors. If leveling nuts are required, provide adhesive anchors, unless otherwise shown.

D. Wedge anchors: Provide one of the following:

1. Installation to Concrete:
a. Hilti Kwik Bolt TZ by Hilti, Inc.
b. Strong-Bolt 2 by Simpson Strong-Tie, Inc.
c. Or approved equal meeting ACI 355.2.

2. Installation to solid-grouted Masonry:
a. Hilti Kwik Bolt-3 by Hilti, Inc.
b. Wedge-All by Simpson Strong-Tie, Inc.
c. Or approved equal.

E. Drop-in anchors , only where specific shown on the drawings : Provide one of the following:

1. HDI by Hilti, Inc.

2. Drop-In by Simpson Strong-Tie, Inc.

3. Or equal.

2.7 SCREW ANCHORS
A. Provide screw anchors only where specifically shown. Provide ICC approved screw anchors suited for seismic and cracked concrete applications.

B. Installation to Concrete or Masonry:

1. KH-EZ by Hilti, Inc.

2. Titen HD by Simpson Strong-Tie, Inc.

3. Or approved equal.

05 05 06-5
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2.8 TOGGLE BOLTS
A. Provide toggle bolts only where specifically shown, to fasten single pipes and conduits <1 inch and equipment weighing less than 50 lbs (4-bolts required) to hollow walls.

B. Provide spring -wing toggle bolts, with two -piece wings, carbon steel bolts with zinc coating in accordance with Federal Specification FF-S-325.

C. Product and Manufacturer: Provide toggle bolts of one of the following:

1. The Rawlplug Company, Incorporated.

2. Haydon Bolts, Incorporated.

3. Or equal.

2.9 OTHERS
A. Powder actuated fasteners and other types of anchors not specified herein shall not be used, unless approved by ENGINEER.

2.10 ACCESSORIES
A. Provide Belleville washers, or approved equal, at anchorage connections used to transfer anchorage loads at sheet metal equipment housings.

PART 3 - EXECUTION

3.1 INSTALLATION OF ANCHORS
A. Obtain anchor bolts in sufficient time so as not to delay concrete or masonry work.

B. Adhesives shall be stored and installed at the service temperature ranges recommended by the manufacturer.

C. Locate and accurately set the anchor bolts using templates or other devices as necessary.

D. Protect threads and shank from damage during installation of equipment and structural steel.

E. Post-installed anchors are NOT acceptable substitutes for cast-in-place anchor bolts.

F. Assure that embedded items are protected from damage and are not filled in with concrete.

G. Unless otherwise shown, the minimum diameter of anchor bolts for structural steel is ¾ inch, and for other applications, 3/8 inch.

H. Unless otherwise shown, provide the following minimum embedment, where “d” is the nominal anchor diameter:

1. Cast-in-place anchors: 12d.

05 05 06-6
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Adhesive anchors: 12d.

3. Expansion anchors: 8d.

I. Unless otherwise shown, provide a minimum edge distance equal to six times the bolt diameter for adhesive anchors, eight times the bolt diameter for expansion anchors and a bolt spacing equal to twelve times the bolt diameter.

J. Concrete shall have a minimum age of 21 days at the time of post -installed anchor installation.

1. Concrete temperature at the time of adhesive anchor installation shall be at least 50oF.

K. Existing reinforcing bars in the concrete structure may conflict with specific anchor locations. Unless noted on the Drawings that the bars can be cut, the CONTRACTOR shall review the existing structural drawings and shall undertake to locate the position of the reinforcing bars at the locations of the concrete anchors by ferroscan, ground penetrating rebar (GPR), x-ray, chipping or other means.

L. Drilling equipment used and installation of post-installed anchors shall be in accordance with the manufacturer's printed instructions.

M. For the adhesive and expansion anchors, CONTRACTOR shall comply with the manufacturer's printed installation instructions on the drilled hole diameter and depth.

N. CONTRACTOR shall properly clean out the hole utilizing a wire brush and compressed air in accordance with the manufacturer’s printed installation instructions to remove all loose material from the hole, prior to installing adhesive or expansion anchor s. Drilled and cleaned anchor holes shall be protected from contamination until the anchor is installed. A drilled anchor hole shall be re -cleaned assuming the hole was just drilled, if in the opinion of ENGINEER or Inspector that the hole has become contaminated after initial cleaning.

O. Unless otherwise indicated by the manufacturer, adhesive shall be dispensed through a tube or cartridge extension, beginning at the maximum depth of the hole and withdrawn as adhesive is injected, followed by insertion and rotating the anchor to the specified depth. Where necessary, spaces around anchors at the surface shall be sealed at horizontal to vertically overhead locations to prevent loss of the adhesive during curing.

P. Anchors to be installed in the adhesive shall be clean, oil -free, and free of loose rust, paint, or other coatings.

Q. Installed anchors shall be securely fixed in -place to prevent displacement. Unless shown otherwise on the Drawings, anchors shall be installed perpendicular to the concrete surface.

R. Reinforcing adhesive dowel bars or all -threaded adhesive bars shall not be bent after being adhesively embedded in hardened, sound concrete.

05 05 06-7
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

S. In lieu of the use of stacked standard washers, if threads of an anchor bolt protrude beyond the attachment, the installers shall use a fabricated filler plate of equal or greater size of the washer. Hole on the filler plate shall be 1/16 inch (or 2 to 3 mm) greater than the bolt size. Coat as appropriate in accordance with the material and installation location requirements.

3.2 FIELD QUALITY CONTROL
A. Anchors shall be installed by qualified personnel in accordance with the manufacturer’s printed installation instructions. Installation of adhesive anchors shall be performed by personnel trained to install adhesive anchors.

B. Installation of adhesive anchors horizontally or upwardly inclined to support sustained tension loads shall be performed by personnel certified by the ACI/CRSI Adhesive Anchor Installer Certification program.

C. CONTRACTOR shall employ a special inspector to perform field inspection services in accordance with Chapter 17 of the IBC for all post-installed anchors.

1. The special inspector must be periodically on the jobsite during post -installed anchor installation.

2. Adhesive anchors installed to resist sustained tension loads shall be continuously inspected during installation by an inspector specially approved for that purpose by the building official.

D. CONTRACTOR shall employ a testing laboratory to perform field quality testing of installed adhesive anchors. A minimum of 10% of randomly selected adhesive anchors and reinforcing dowel bars greater than 3/8 inch diameter are to be tension tested to the least of 50 percent of expected adhesive ultimate bond strength or 80 percent of steel yield strength of the anchor rod. Maintain the proof load at the required load level for a minimum of 10 seconds.

1. Tension testing shall be performed in accordance with ASTM E488.

2. The independent testing laboratory shall submit an anchorage testing plan for approval to ensure the testing requirements are fulfilled.

3. If failure of more than 5 percent of the tested anchors or reinforcing dowel bars occurs, CONTRACTOR will be required to pay for the costs involved in testing the remaining 90%.
a. Concrete cracking in the vicinity of the anchor after loading shall be considered a failure.

E. CONTRACTOR shall correct improper workmanship, remove and replace, or correct as instructed by the ENGINEER, all anchors or bars found unacceptable or deficient, at no additional cost to the OWNER.

F. The independent testing and inspection agency shall complete a report on each area.

The report should summarize the observations made by the inspector and be submitted to ENGINEER.

G. Provide access for the testing agency to places where Work is being produced so that required inspection and testing can be accomplished.

05 05 06-8
Anchors, Inserts and Dowels
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

++ END OF SECTION ++

07 92 03-1
Joint Sealants
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 07 92 03

JOINT SEALANTS
PART 1 - GENERAL

1.1 SUBMITTALS
A. Product Data: Surface preparation and installation instructions. Indicate where each product is proposed to be used. Provide sealant certified to NSF/ANSI Standard 61 where sealant is in direct contact with potable water.

B. Samples: Material proposed for use showing color range available.

C. Quality Control Submittals:

1. Applicator Qualification: Documentation showing minimum of 5 years' experience installing sealants in projects of similar scope.

2. Certificates of Compliance: Proposed materials meet Specification requirements.

1.2 ENVIRONMENTAL REQUIREMENTS
A. Ambient Temperature: Between 40 and 80 degrees F (4 and 27 degrees C) when sealant is applied. Consult manufacturer when sealant cannot be applied within these temperature ranges.

PART 2 - PRODUCTS

2.1 SEALANT MATERIALS
A. Sealant Characteristics:

1. Uniform, homogeneous.

2. Free from lumps, skins, and coarse particles when mixed.

3. Nonstaining, nonbleeding.

4. Hardness of 15 minimum and 50 maximum, measured by ASTM C661 method.

5. Immersible may be substituted for nonimmersible.

B. Sealant Color: To match adjacent surfaces or as selected by ENGINEER.

C. One-Part Polyurethane, Immersible:

1. Polyurethane base, single -component, moisture curing; ASTM C920, Type S, Grade NS or P, Class 25.

2. Capable of being continuously immersed in water.

3. Designed to be used where the maximum depth of sealant will not exceed 1/2 inch.

4. Provide sealant certified to NSF/ANSI Standard 61 where sealant is in direct contact with potable water.

5. Manufacturers and Products for Nonsag:
a. Sika Construction: Sikaflex-1a.
b. Tremco: Vulkem 116.

07 92 03-2
Joint Sealants
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. Or approved equal.

6. Manufacturers and Products for Self-Leveling:
a. Sika Construction: Sikaflex-1C SL.
b. Tremco: Vulkem 45 SSL.
c. Or approved equal.

D. Two-Part Polyurethane, Immersible:

1. Polyurethane elastomeric, two-part, self leveling (or gun grade), non-staining, which cures at ambient temperature and conforms to ASTM C920.

2. Designed to be used where the maximum depth of sealant will exceed 1/2 inch or where chemical curing is required.

3. Manufacturers and Products:
a. Sika Construction: Sikaflex-2C.
b. Tremco: Dymeric 240FC.
c. Or approved equal.

E. Waterproof Expandable Sealant

1. One-component, polyurethane foam that expands and cures slowly to a semi-rigid, closed cell foam upon reaction with moisture, such as ambient humidity

2. Manufacturers and Products:
a. Sika Chemical Corp.; Boom
b. Or approved equal

2.2 BACKUP MATERIAL
A. Nongassing, extruded, closed-cell round polyethylene foam rod, compatible with sealant used, and as recommended by sealant manufacturer.

B. Size: As shown or as recommended by sealant material manufacturer. Provide for joints greater than 1/2-inch deep. Backup material should be sized to maintain 2:1 width to depth ratio to the greatest extent possible.

C. Manufacturers and Products:

1. Dow Corning; Ethafoam SB.

2. Sonneborn; Sonofoam.

3. Or approved equal.

2.3 ANCILLARY MATERIALS
A. Bond Breaker: Pressure sensitive tape as recommended by sealant manufacturer to suit application. Provide bond breaker tape in the bottom of joints to prevent 3 -sided joint sealant adhesion when backup material is not used.

B. Joint Cleaner: Noncorrosive and nonstaining type, recommended by sealant manufacturer; compatible with joint forming materials.

C. Primer: Nonstaining type recommended by sealant manufacturer to suit application

07 92 03-3
Joint Sealants
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

PART 3 - EXECUTION

3.1 GENERAL
A. Use of more than one material for the same joint is not allowed unless approved by the sealant manufacturer.

B. Install joint sealants in accordance with ASTM C1193.

C. Horizontal and Sloping Joints of 1 Percent Maximum Slope: Use self-leveling (Grade P) joint sealant.

D. Steeper Sloped Joints, Vertical Joints, and Overhead Joints: Use nonsag (Grade NS) joint sealant.

3.2 PREPARATION
A. Verify that joint dimensions, and physical and environmental conditions, are acceptable to receive sealant.

B. Surfaces to be sealed shall be clean, dry, sound, and free of dust, loose mortar, oil, and other foreign materials.

1. Mask adjacent surfaces where necessary to maintain neat edge.

2. Starting of work will be construed as acceptance of subsurfaces.

3. Apply primer to dry surfaces as recommended by sealant manufacturer.

C. Verify that joint shaping materials and release tapes are compatible with sealant.

D. Examine joint dimensions and size materials to achieve required width/depth ratios.

E. Carefully follow manufacturer's instructions for mixing multi-component products.

3.3 INSTALLATION
A. Use joint filler to achieve required joint depths, to allow sealants to perform intended function.

1. Install backup material as recommended by sealant manufacturer.

2. Where possible, provide full length sections without splices; minimize number of splices.

3. Tape sealant may be used as joint filler if approved by sealant manufacturer.

B. Use bond breaker where recommended by sealant manufacturer and in the bottom of joints to prevent 3-sided joint sealant adhesion.

C. Seal joints around window, door and louver frames, expansion joints, and elsewhere as indicated.

D. Joint Sealant Materials: Follow manufacturer's recommendation and instructions, filling joint completely from back to top, without voids.

07 92 03-4
Joint Sealants
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

E. Joints: Tool slightly concave after sealant is installed.

1. When tooling white or light color sealant, use a water wet tool.

2. Finish joints free of air pockets, foreign embedded matter, ridges, and sags.

F. Tape Sealant: Compress to 50 percent of expanded thickness and install in accordance with manufacturer's instructions.

3.4 CLEANING
A. Clean surfaces next to the sealed joints of smears or other soiling resultant of sealing application.

B. Replace damaged surfaces resulting from joint sealing or cleaning activities.

++ END OF SECTION ++

09 91 03-1
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 09 91 03

PAINTING
PART 1 - GENERAL

1.1 DESCRIPTION
A. Scope: Provide and install coatings on all exposed surfaces as indicated herein, in other Specification Sections, and on the Drawings.

1.2 QUALITY ASSURANCE
A. Experience: Both Coatings Manufacturer and Coatings Installer shall have a minimum 5 years’ experience in production and application, respectively, of specified products.

Coatings Installer shall be approved and endorsed, in writing, by Coatings Manufacturer.

B. Regulations: Meet federal, state, and local requirements which apply to the work, including, but not limited to those regulations limiting the emission of volatile organic compounds.

C. Coatings Manufacturer Recommendations: Coatings Installer shall follow all recommendations of the Coatings Manufacturer regarding storage, handling, surface preparation, application of coatings, recoat times, environmental conditions during storage, preparation and application of coatings, and all other Coatings Manufacturer recommendations.

D. Warranty: Both Coatings Manufacturer and Coatings Installer shall provide a 1 -year complete replacement warranty for all coatings. Manufacturer shall provide 5 -year warranty for long-term performance of coatings in addition to 1-year warranty.

1.3 SUBMITTALS
A. Shop Drawings, Coatings Manufacturer shall submit for approval the following:

1. Copies of Manufacturer's technical information and application instructions for each material proposed for use. Specify exactly which product is being proposed for each coating type (as specified below). This may be accomplished through a reference table along with information on the various products, or by a separate, tabbed section with information on products being submitted for each system in a separate tab of a binder. Submittal of general Manufacturer’s literature without detailing which product is proposed for each paint system will be unacceptable.

2. Copies of Manufacturer's complete color charts for each coating system.

3. Letter from the Coatings Manufacturer approving and endorsing Coatings Installer.

4. Letter from Coatings Manufacturer stating that volatile organic compounds (VOCs) meet all Federal, State and Local requirements.

5. Furnish copies of the final, approved submittal to the Coatings Installer so that it is clear which product is to be used for which each system.

B. Reference Samples:

09 91 03-2
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Provide reference samples of paint colors and textures as required by the ENGINEER.

Reference samples will show the color and texture of the final paint to be applied and shall be approved by the ENGINEER prior to painting. Reference samples should be applied to similar substrates to the final surfaces to be painted. If ENGINEER chooses to forego reference samples, CONTRACTOR must receive the allowance to forego reference samples before painting begins or all painted surfaces will be re-painted at the ENGINEER’s discretion and at no additional cost to the CITY.

1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Protection: Protect all pre-coated items from coating damage during shipping.

B. Store products in accordance with Manufacturer’s directions.

C. Store products in a neat, orderly fashion. Protect products from damage. Protect storage area from damage from stored products.

PART 2 - PRODUCTS

2.1 PRODUCT AND MANUFACTURER:

A. Provide coating types as listed in the following table. The systems referenced in the table are those provided by TNEMEC and Sherwin-Williams. If manufacturers other than TNEMEC or Sherwin Williams are desired, the CONTRACTOR shall submit equivalent paint systems.

COATING TYPE DESCRIPTION Sherwin
Williams Series

TNEMEC SERIES
Clear Polyamine
Epoxy
Clear Polyamine Epoxy, high solids,
moisture resistant, designed as a
one-coat wood sealer.

GP3477 Series 201,
Epoxoprime
Acrylic Filler Waterborne Cementitious Acrylic
designed for application on porous
surfaces such as rough-faced
concrete masonry units
CementPlex
875
Series 130,
Envirofill
Interior Acrylic
Latex
Single component, finish as required ProMar 200 N/A
Industrial Acrylic Single component, high density
acrylic finish for interior, exterior
surfaces
Pro Industrial
High
Performance
Acrylic
Series 1029
Interior Latex
Primer/ Sealer
Waterborne vinyl acrylic
primer/sealer for interior gypsum
wallboard/plaster. Capable of
providing uniform seal and suitable
for use with specified finish coats.

ProMar 200
Primer
Series 115
Exterior Acrylic
Latex
Primer/Sealer
Capable of providing uniform seal and
suitable for use with specified finish
coats.

Extreme Bond
Latex Primer
Series 1028

09 91 03-3
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

Polyamine Epoxy
Sealer
Waterborne Polyamine Epoxy,
penetrating, flexible and low-odor
primer designed for sealing porous
substrates.

Multi-Purpose
Acrylic Primer
Series 151,
Elasto-Grip FC
Acrylate Modified Waterborne Acrylate
designed for application on porous
surfaces such as rough-faced
concrete masonry units or wood
surfaces. Flexible and breathable,
moisture and UV resistant. Matte
Finish
Loxon XP Series 156,
Enviro-crete
Polyamidoamine
Epoxy
Polyamidoamine Epoxy designed for
use on steel or other ferrous metals
not in contact with potable water but
submerged or immersed in
wastewater or non-potable water.

Series N69, V69
or L69 (type per
local VOC
regulations), Hi-
Build Epoxoline
II
Polyamidoamine Epoxy designed for
use on steel or other ferrous metals
in contact with potable water.

Macropoxy
5500
Series N140,
L140 or V140
(type per local
VOC
regulations),
Pota-Pox Plus
Polyurethane Aliphatic Acrylic Polyurethane
designed for exterior weathering,
abrasion and corrosion resistance
HS
Polyurethane
250 or
Waterbased
Acrolon
Series 1095,
Endura-Shield
Silane Water
Repellent
Sealant
Silane/Siloxane penetrating water
repellent blend designed for
application on above-grade concrete,
stucco, block, masonry and stone
surfaces
Loxon 7%
Siloxane
Series 636, Dur
A Pell 20
Wood Sealer /
Stain
Single component, 250 g/l wood stain
in clear or standard colors
Minwax 250
Wood Varnish
Finish
Single component polyurethane
varnish
Minwax
B. All coatings used shall comply with Federal, State and local VOC limits based on application location.

2.2 COLOR
A. Color Pigments: Pure, nonfading, lead-free applicable types to suit the sub strates and service indicated.

B. Provide colors as described in the drawings or specifications, or as selected by ENGINEER from standard color palette. For piping system colors, reference pipe schedule.

09 91 03-4
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

C. Where existing colors are to be matched or satisfactory color is not available from standard color palette, provide custom-mixed colors.

D. Provide samples of each color on the substrate to be coated for approval by the ENGINEER prior to beginning coating application.

PART 3 - EXECUTION

3.1 SURFACE PREPARATION
A. Coatings Installer shall prepare all surfaces to be painted in strict accordance with Coatings Manufacturer’s recommendations.

B. Coatings Manufacturer representative shall observe Coatings Installer ’s methods of preparing surfaces and approve of the work prior to Coatings Installer beginning coating installation. If, after a period of time, Coatings Manufacturer is satisfied with Coatings Installers methods, Coatings Manufacturer can allow Coatings Installer to proceed without inspection following surface preparation. Coatings Manufacturer and installer will still both be held equally accountable for any coatings failure.

3.2 PROTECTION
A. Protect all adjacent surfaces from overspray, dripping or other transfer of coatings not intended for those surfaces. Use masking, tape, drop cloths, plastic and other protective materials as appropriate.

1. Remove, mask, or otherwise protect hardware, lighting fixtures, switchplates, aluminum surfaces, stainless steel surfaces, machined surfaces, couplings, shafts, bearings, nameplates on machinery, and other surfaces not intended to be painted.

2. Protect working parts of mechanical and electrical equipment from damage during surface preparation and painting process. Mask openings in motors, fan housings, etc. to prevent coatings from falling inside.

3. Correct all damages by cleaning, repairing or replacing, and repainting, as acceptable to ENGINEER.

B. Completely remove all masking, tape, drop cloths, plastic and other protective materials within 48 hours of completion of application of finish coat. Take special care to remove masking and plastic which cover tank vent openings, HVAC registers, vents, motor vents, and other areas where airflow is critical to proper operation.

3.3 APPLICATION
A. Paint all exposed surfaces not specifically excluded in 3.3.C, below. Provide and install Coatings in accordance with the following Table , unless otherwise specified in other Sections:

09 91 03-5
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B.

COATING
SYSTEM
NO.

SURFACE TO

BE COATED
PRIMER

COATING
NO OF
PRIMER
COATS

PRIME COAT

THICKNESS
(EACH
COAT)
FINISH

COATING
NO OF
FINISH
COATS

FINISH COAT

THICKNESS
(EACH COAT)
100 Concrete
Masonry
Units
(Interior)
Acrylic Filler 1 70 SF/Gal
Applicatio
n Rate
Acrylate 2 135 SF/Gal
Application
Rate
101 Concrete
Masonry
Units
(Exterior)
Silane
Waterproofing
Sealant
1 250
SF / Gal
Applicatio
n Rate
None
102 Concrete
Roof Slab
(Exterior)
Silane
Waterproofing
Sealant
1 250
SF/Gal
Applicatio
n Rate
None
200 Wood
(Interior and
Exterior)
Polyamine
Epoxy
1 250
SF/Gal
Applicatio
n Rate
Acrylate 2 135 SF/Gal
Application
Rate
201 Wood
(Interior,
where
noted)
Wood Sealer 1 250
SF/Gal
Applicatio
n Rate
Wood Finish 1 350 SF/Gal
Application
Rate
202 Gypsum
Board
(Interior)
Interior Latex
Primer/Sealer
1 350
SF/Gal
Applicatio
n Rate
Interior Acrylic
Latex
(Semigloss)
2 400 SF/Gal
Application
Rate
300 Exposed
Ferrous Pipe
Systems and
Exposed
Steel Items
Polyamidoamine
Epoxy
2 4-6 MDFT Polyurethane 2 2-3 MDFT
301 Exposed,
Non-metallic
Pipe
Systems
Exterior Latex
Primer/Sealer
1 3-5 MDFT Industrial Acrylic
(Semigloss)
2 3-5 MDFT
302 Immersed
Ferrous Pipe
Systems and
Steel Items
Polyamidoamine
Epoxy*
1 6-10
MDFT
Polyamidoamine
Epoxy*
1 6-10
MDFT
303 Immersed
Non-metallic
Pipe
Systems
Latex
Primer/Sealer*
1 4-6 MDFT Industrial Acrylic
(Semigloss)*
1 4-6 MDFT
304 Buried
Ferrous and
Steel Items
Polyamidoamine
Epoxy
1 8-10
MDFT
Polyamidoamine
Epoxy
1 8-10 MDFT

09 91 03-6
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

COATING
SYSTEM
NO.

SURFACE TO

BE COATED
PRIMER

COATING
NO OF
PRIMER
COATS

PRIME COAT

THICKNESS
(EACH
COAT)
FINISH

COATING
NO OF
FINISH
COATS

FINISH COAT

THICKNESS
(EACH COAT)
305 Aluminum
Surfaces in
Contact with
Concrete
Polyamidoamine
Epoxy
1 4-6 MDFT None
Pumps Touch up factory applied coatings, per Pump Specifications

* Where in contact with potable water, coating shall be NSF-61 certified.

C. Items Delivered with Factory Applied Primer:

1. For items delivered with a factory applied primer and requiring painting under this Section, the factory applied primer may be used in lieu of field applied primer only under the following conditions:
a. The ENGINEER approves the use of the factory applied primer in lieu of field applied primer.
b. The factory applied primer is certified by the Coatings Manufacturer as compatible with the field applied finish coat.
c. The Coatings Manufacturer’s recommended recoat time for the factory applied primer has not been exceeded.

2. If all of the above conditions are not met, the Coatings Installer shall re-prepare all surfaces to be painted in strict accordance with Coatings Manufacturer ’s recommendations and primer applied, in accordance with this Section.

D. Table Definitions:

1. SF/Gal: Square foot of coverage per gallon of coating used.

2. MDFT: mil dry film thickness

3. mil: 1/1000 of an inch paint thickness

4. Ferrous Pipe: Includes Ductile Iron, Cast Iron, Steel, and Galvanized Steel piping

5. Steel Items: Includes steel and galvanized steel items such as structural steel, doors, window frames, overhead coiling doors, bollard posts, steel gates, steel fences, and all other steel and galvanized steel items.

6. Non-Metallic Pipe: Polyvinyl Chloride, Chlorinated Polyvinyl Chloride, Fiberglass Reinforced Plastic, High Density Polyethylene

7. Exposed: Located above grade, exposed to the atmosphere not submerged. Includes surfaces inside and outside of buildings.

8. Submerged: In an area which normally is under water or other liquid or is intermittently under water or other liquid.

9. Buried: Located below grade, surrounded by backfill.

E. Surfaces Not Requiring Painting:

1. Unless otherwise stated or shown below or in other sections, the following areas or items will not require painting or coating:
a. Concrete surfaces.
b. Reinforcing steel.
c. Copper, bronze, brass, Monel, aluminum, chromium plate, and stainless-steel surfaces, except where:
1) Required for electrical insulation between dissimilar metals.

09 91 03-7
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2) Aluminum and stainless steel are embedded in concrete or masonry, or aluminum is in contact with concrete or masonry.
3) Color coding of equipment and piping is required.
d. Existing piping, fittings and pipe supports.
e. Pipe unions or portions of piping systems where painting would make disassembly difficult or impossible.
f. Prefinished electrical, mechanical, and architectural items such as motor control centers, switchboards, switchgear, panelboards, transformers, disconnect switches, HVAC equipment enclosures, ductwork, acoustical tile, cabinets, louvers, and wall panels.
g. Electrical conduits.
h. Cathodic protection anodes.
i. Insulated piping and insulated piping with jacket will require prime coat only. j. Fiberglass reinforced plastic (FRP) surfaces with an integral ultra-violet resistant colored gel coat do not require painting, provided the color is as selected. k. Glass, plexiglass or other transparent or translucent material intended to allow passage of light.
l. Civil/site materials such as asphalt, gravel, rock, chain-link fence, and plantings.

3.4 RECOAT TIMES
A. Coatings Installer shall observe all requirements of the Coatings Manufacturer regarding recoat times.

3.5 PAINT LOG
A. Coatings Installer shall keep a paint log

1. Specific details of the contents and format paint log shall be determined by the Coatings Installer and approved by the ENGINEER.

2. At a minimum, paint log shall record, on a daily basis for any day when coating work is performed:
a. Weather conditions, including 3-day forecast
b. Which surfaces were prepared for coating
c. Approval of surface preparation by the Coatings Manufacturer representative d. Which surfaces or systems were coated that day
e. Who the installer was (specific names of persons on crew) f. Which coating type was used
g. Which coat was installed
h. What the application rate or MDFT was (as approved by ENGINEER)

3. Paint log shall be kept on-site. Paint log shall be signed on a daily basis, for any day when coating work is performed, by the supervisor of the coatings installer field crew and by the ENGINEER.

4. Any painted surface which was not recorded in the paint log shall be stripped , re- prepared, and recoated at the ENGINEER’s discretion.

3.6 WARRANTY INSPECTION
A. Warranty inspection shall be conducted during the eleventh month following completion of the Work. All defective Work shall be repaired by the CONTRACTOR in accordance with

09 91 03-8
Painting
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

this Specification and to the satisfaction of the ENGINEER and at the CONTRACTOR'S expense.

B. Any location where paint has peeled, bubbled, or cracked and any location where rusting is evident shall be considered to be a failure of the system. The CONTRACTOR shall make repair at all points where failures are observed by removing the deteriorated paint, cleaning the surface, and recoating or repainting with the same system. If the area of failure exceeds 25 percent of the total coated or painted surface, the entire coating or paint system may be required to be removed and repainted in accordance with this specification as determined by the ENGINEER.

C. All costs for CONTRACTOR'S inspection, Manufacturer's inspection and all costs for repair shall be borne by the CONTRACTOR.
++ END OF SECTION ++

31 05 03-1
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 31 05 03

EARTHWORK
PART 1 - GENERAL

1.1 DESCRIPTION
A. Section includes: All excavating, backfilling, filling, grading, subgrade preparation and disposing of earth materials as required. It also includes all temporary means needed to prevent discharge of sediment to watercourses from dewatering systems or erosion.

1.2 REFERENCES
A. American Society for Testing and Materials (ASTM)

1. ASTM C33, Standard Specification for Aggregate Material.

2. ASTM D422, Method for Particle-Size Analysis of Soils.

3. ASTM D423, Liquid Limit of Soils.

4. ASTM D427, Shrinkage Factors of Soils.

5. ASTM D698, Test Method for Laboratory Compaction Characteristics of Soil.

6. ASTM D1556, Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method.

7. ASTM D2922, Test Methods for Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth).

8. ASTM D2166, unconfined compressive strength of soils.

B. Occupational Safety and Health Administration (OSHA)

1. Title 29, Code of Federal Regulations, Part 1926
C. City of Roseville

1. Design and Construction Details for Trench Backfill

1.3 SYSTEM DESCRIPTION
A. Permits and Regulations:

1. Perform excavation Work in compliance with applicable requirements of governing authorities having jurisdiction.

2. Obtain all necessary permits for Work in roads, rights -of-way, railroads, etc. Also, obtain permits as required by local, state and federal agencies for discharging water from excavations, for erosion control, and for prevention of air and water pollution.

1.4 SUBMITTALS
A. Test Reports - Borrow, Backfill, and Grading: Testing laboratory shall submit copies of the following reports directly to ENGINEER:

1. Tests on borrow material.

2. Tests on footing subgrade.

3. Field density tests.

4. Optimum moisture - maximum density curve for each soil used for backfill.

31 05 03-2
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

5. Reports of observations for conformance of borrow material to the Project Geotechnical Report.

6. Quality Control Plan: Names and phone numbers of independent testing companies that will be used to perform soil and asphalt concrete testing, qualifications, and proposed procedures for performing tests and providing test results to ENGINEER.

B. Submit to the ENGINEER samples of all materials, including select backfill, general backfill, bedding, crushed stone, sand and topsoil. Submit samples of the proposed material at least seven days in advance of its anticipated use.

PART 2 - PRODUCTS

2.1 MATERIALS
A. General:

1. All material will be tested by the laboratory and approved by the ENGINEER.

2. No material shall be placed without the approval of the ENGINEER.

B. Marking Tape:

1. Plastic:
a. Inert polyethylene, impervious to known alkalis, acids, chemical reagents, and solvents likely to be encountered in soil.
b. Thickness: Minimum 4 mils.
c. Width: 12 inches.
d. Identifying Lettering: Minimum 1-inch high, permanent black lettering imprinted continuously over entire length.
e. Manufacturers and Products:
1) Reef Industries; Terra Tape.
2) Allen; Markline.
3) Or equal.

2. Metallic:
a. Solid aluminum foil, visible on unprinted side, encased in a protective high visibility, inert polyethylene plastic jacket.
b. Foil Thickness: Minimum 5.5 mils.
c. Width: 12 inches.
d. Identifying Lettering: Minimum 1-inch high, permanent black lettering imprinted continuously over entire length.
e. Joining Clips: Tin or nickel-coated, furnished by tape manufacturer. f. Manufacturers and Products:
1) Reef Industries; Terra ”D”.
2) Allen; Detectatape.
3) Or equal.

3. Marking tape shall be marked with the following statements:
a. Sanitary Sewer Pipeline: “CAUTION – SANITARY SEWER PIPELINE BURIED BELOW.”
b. For Existing Utilities Within Trench Limits: “CAUTION – BURIED PIPELINE/CONDUIT” or as specified by utility owner.

4. Color:
a. Sanitary Sewer Pipeline: Green, as specified in ANSI Z53.1 Safety Color Code.

31 05 03-3
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

b. Others Disturbed: Color, as specified for specific utility in ANSI Z53.1 Safety Color Code.

C. Pipe Locating Wire:

1. Pipe locating wire shall be bare AWG No. 10, soft drawn, single-strand copper wire.

2. Provide at least 6-mil PVC electrical tape insulation around wire where adjacent to metal pipe, valves, and in all valve boxes.

D. Filter Fabric:

1. Filter fabric shall be Mirafi, Type 140N; Dupont, Type PAR, Style 3401, or equal and shall conform to the following requirements:

2. Minimum grab strength of 120 lbs per ASTM D4632.

3. Apparent open size (AOS) to be equal to or greater than the U.S. Standard Sieve No. 100 (0.210 mm) per ASTM D4751.

4. Percent open area not to exceed about 25 percent. The percent open area is defined as the ratio of the sum of 20 or more individual open areas (times 100) to the sum of the corresponding 20 or more individual total areas.

5. Permittivity shall not be less than 1.7 sec-1.

E. Fill Material:

1. Classification:
a. Fill adjacent to structures to a distance measured horizontally from the structure that is equal to the depth from the finished grade is classified as Select Fill. b. Outside these limits, the fill is classified as Common Fill, unless otherwise specified.

2. Common Fill:
a. Common Fill materials shall consist of soils obtained from on -site excavations or off-site sources that are uniformly mixed, contain no organic material, and have been passed through a 3-inch screen.
b. The maximum expansion of off-site materials shall be 1.5% as performed on a sample remolded to approximately 9% of the maximum dry density as determined in accordance with ASTM D 698 at 2% below optimum moisture content under a 100 psf surcharge pressure.
c. If on-site material is unsuitable as determined by the ENGINEER, imported fill shall be used.

3. Select Fill:
a. Select fill or backfill is material selected by the ENGINEER from the excavation. b. Select material shall be free of organic or other unsuitable materials and shall not contain rocks, or unbroken masses of soil larger than 4 inches in greatest dimension.

F. Aggregate Base:

1. Class 2, ¾ inch maximum conforming to Section 26 of the Caltrans Standard Specifications.

G. Granular Bedding:

1. Well-graded sand and gravel materials.

2. Unfrozen, friable, and no clay balls, roots, or other organic material.

3. Clean or gravelly sand with less than 5 % passing No. 200 sieve, as determined in accordance with ASTM D1140, or gravel or crushed rock within maximum particle size and other requirements as follows unless otherwise specified.

31 05 03-4
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

4. 3/4-inch maximum particle size, except 1/4 inch for stainless steel pipe, copper pipe, tubing, and plastic pipe under 3-inch diameter.

5. Conduit and Direct-Buried Cable:
a. Sand, clean or clean to silty, less than 12% passing No. 200 sieve. b. Individual Particles: Free of sharp edges.
c. Maximum Size Particle: Pass a No. 4 sieve.
d. If more than 5 % passes No. 200 sieve, the fraction that passes No. 40 sieve shall be non-plastic as determined in accordance with ASTM D4318.

H. Sand:

1. Natural or manufactured granular material, containing no organic material.

2. Sand will be non -plastic, when tested in accordance with ASTM D 4318, 100% passing a ½ inch screen and no more than 20% passing a No. 200 screen.

I. Crushed Stone:

1. Crushed stone will be crushed rock or gravel conforming to the requirements of ASTM C33, Size #57.

J. Gravel Surfacing

1. Gravel Surfacing will be crushed rock, angular, and well-graded.

2. Maximum size of ¾ inch, at least 50% passing the No 4. screen, between 10 and 30% passing the No. 10 screen and no more than 15% passing the No. 40 screen.

3. Color to be selected by CITY.

K. Controlled Low Strength Material (CLSM):

1. Select and proportion ingredients to obtain compressive strength between 50 and 150 psi at 7 days in accordance with ASTM D4832. Sufficient cement shall be added to meet the strength and material requirements given below and as required to provide sufficient strength for compacting overlying trench backfill. Provide certified mix design and test results in accordance with submittal requirements.

2. Materials:
a. Cement: ASTM C150, Type I or II, two sacks minimum per cubic yard. b. Aggregate: ASTM C33, maximum Size 7. The amount of material passing a No. 200 sieve shall not exceed 12%. The above No. 200 sieve material shall be well graded so as to avoid segregation. The minus #200 sieve fraction shall be non- plastic.
c. Fly Ash (if used): ASTM C618, Class C or F.
d. Water: Clean, potable, containing less than 500 ppm of chlorides.

3. Mix Design:
a. The CONTRACTOR and its suppliers shall determine the materials and proportions used to meet the requirements of these Specifications. Make daily checks of the aggregate gradation and adjust the mix design as required. Modify the CLSM mix as necessary to me et the flowability, pumpability, and set time requirements for each individual pour.
b. At least 30 days before placing CLSM, submit to the ENGINEER a mix design for each CLSM to be used. The mix design shall include trial lab and field data, with pairs of 6 -inch by 12 -inch cylinder breaks performed at 7, 14, and 28 days.

Molds shall be plastic or waxed cardboard. The mix design shall be performed by an independent laboratory under the direction of an engineer licensed in California.

31 05 03-5
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. No CLSM shall be placed until the ENGINEER has approved the mix design. The ENGINEER’s approval of the mix design shall be understood to indicate conditional acceptance. Final acceptance will be based on tests conducted on field samples and conformance with these Specifications.

PART 3 - EXECUTION

3.1 PREPARATION
A. Inspection:

1. Provide ENGINEER with sufficient notice and with means to examine the areas and conditions under which excavating, filling, and grading are to be performed.

2. ENGINEER will notify CONTRACTOR if conditions are found that may be detrimental to the proper and timely completion of the Work.

3. Do not proceed with the Work until unsatisfactory conditions have been corrected in a manner acceptable to ENGINEER.

B. “Pot-holing”:

1. Excavate and backfill, in advance of the construction, test pits to determine conditions or location of the existing utilities and structures.

2. Definite the location of each existing facility involved within the area of his excavation for Work under this Contract.

3. Exercise care during such location work to avoid damaging and/or disrupting the affected facility.

4. CONTRACTOR is responsible for repairing, at his expense, damage to any structure, piping, or utility caused by his Work.

C. Temporary Fencing:

1. Furnish and install a temporary fence surrounding excavations and work area, including the stockpile and storage areas.

2. Provide fence openings only at vehicular, equipment, and worker access points.

3.2 EROSION CONTROL
A. General: Implement the construction procedures outlined herein to assure minimum damage to the environment during construction. Take all additional measures required to conform to the requirements of applicable codes and regulations.

1. Whenever possible, locate and construct access and temporary roads to avoid environmental damage. Make provisions to regulate drainage, avoid erosion , and minimize damage to vegetation.

2. Where areas must be cleared for storage of materials or temporary structures, provisions will be made for regulating drainage and controlling erosion, subject to the ENGINEER'S approval.

3. Remove only those shrubs and grasses that must be removed for construction.

Protect the remainder to preserve their erosion-control value.

B. Control Measures: Apply meas ures to control erosion and to minimize the siltation of the existing waterways, and natural ponding areas. Such measures include, but are not limited to, the use of berms, baled straw silt barriers, gravel or crushed stone, mulch, slope drains, and other methods.

31 05 03-6
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Install erosion and sediment control practices where shown and according to applicable standards, codes, and specifications. The practices will be maintained in effective working condition during construction and until the drainage area has been permanently stabilized.

2. Temporary measures will be coordinated with the construction of permanent drainage facilities and other Work to the extent practicable to assure economical, effective, and continuous erosion and siltation control.

3. CONTRACTOR will provide special care in areas with steep slopes. Disturbance of vegetation will be kept to a minimum to maintain stability.

4. After stabilization, remove all straw bale dikes, debris, etc., from the site.

C. Dust Control:

1. Prevent blowing and movement of dust from exposed soil surfaces and access roads to reduce on- and off-site damage and health hazards.

2. Control may be achieved by irrigation in which the site is sprinkled with water until the surface is moist.

3. Repeat the process as needed.

D. Failure to Comply: In the event CONTRACTOR repeatedly fails to satisfactorily control erosion and siltation, the CITY reserves the right to employ outside assistance or to use its own forces to provide the corrective measures indicated. The cost of such work, plus engineering costs, will be deducted from monies due CONTRACTOR.

3.3 DEWATERING
A. General:

1. Continuously control all water during the course of construction, including surface water and ground water, to prevent any damage to any excavation or to the construction activities occurring within those excavations.

2. Maintain all dewatering systems full time (24-hours/day) during the entire time the excavation is open. Do not shut down dewatering systems at night, on weekends or on holidays, or any other time the excavation is open.

3. Each excavation will be kept dry during subgrade preparation and continually thereafter until the structure to be built, or the pipe to be installed therein is inspected by the ENGINEER and backfill operations have been completed.

4. Provide adequate alarm, monitoring and back -up systems for all dewatering systems to maintain control of all water during all times any excavation is open.

B. Surface Water:

1. Provide and maintain adequate drainage and dewatering system to prevent surface water from entering excavations and to remove and dispose of all rainwater entering excavations, trenches, or other parts of the Work.

2. Keep the different working areas on the site free of surface water at all times.

Special care will be taken to eliminate depressions that could serve as mosquito pools.

3. The diversion and removal of surface water will be performed in a manner that will prevent the accumulation of water behind temporary structures or at any other locations within the construction area where it may be detrimental.

C. Ground Water:

31 05 03-7
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

1. Provide, operate an d maintain dewatering system to permit excavation and subsequent construction activities in a dry, safe environment.

2. System shall be of sufficient size and capacity to maintain groundwater level a minimum of 2 feet below the lowest point of excavation.

3. Contractor shall make an assessment of the potential for dewatering induced settlement of surrounding soils and structures. Contractor shall provide all necessary equipment and facilities, including re -injection wells, cutoff walls, infiltration trenches, etc, to prevent damage to adjacent structures.

D. Disposal of water:

1. Disposal of discharge water shall conform to any and all applicable permit requirements.

3.4 EXCAVATION SUPPORT SYSTEMS
A. Trench Support

1. Provide, install and maintain trench shields for all trench excavations for which trench shields are required (at a minimum, as required by OSHA).

2. Follow all OSHA guidelines and other applicable laws and ordinances.

3. Elevation of Bottom:
a. Excavation of earth material below the bottom of a shield will not exceed the limits established by ordinances, codes, laws and regulations. b. When using a shield for pipe installation, the bottom of the shield will not extend below the mid-diameter of installed pipe at any time.
c. When using a shield for the installation of structures, the bottom of the shield shall not extend below the top of the bedding for the structures.

4. Moving Shield: When a shield is removed or moved ahead, extreme care will be taken to prevent the movement of pipe or structures or the disturbance of the bedding for pipe or structures. Pipe or structures that are disturbed are to be removed and reinstalled as specified.

B. Below Grade Structure Excavation Support

1. Provide, install and maintain excavation support systems for all structural excavations where excavation support is required (at a minimum, as required by OHSA).

2. Follow all OSHA guidelines and other applicable laws and ordinances.

3. Prepare excavation support plan addressing the following topics:
a. Details of shoring, bracing, sloping or other provisions for worker protection from the hazards of caving ground
b. Design assumptions and calculations
c. Methods and sequencing of installing excavation support d. Proposed locations of stockpiled excavated materials e. Minimum lateral distance from the crest of slopes for vehicles, equipment , and materials
f. Location of vertical and horizontal monitoring points on structures and recommended frequency of monitoring for excavation support system stability and performance

4. Design of excavation support systems and excavation support plan shall be prepared by a civil or structural engineer registered in the state in which the system is installed.

31 05 03-8
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

a. Excavation support system shall consist of h -pile and lagging, sheet piles, or other reliable method of excavation support.
b. The use of below-ground tiebacks is allowed, however, Contractor is responsible for locating and avoiding potential conflicts with existing utilities in the area in which the tie-backs are installed. All tiebacks shall be further than 3 feet from any conflicting utility. Tiebacks shall not use existing structures for support.

C. Removal of Excavation Support

1. Completely remove all excavation support unless ENGINEER specifically allows requested excavation support to remain in place after backfill.

2. Remove all excavation support in a manner that will maintain support as excavation is backfilled and will not leave voids in the backfill.

3.5 EXCAVATION
A. General:

1. Material removed: Excavations include earth, sand, clay, gravel, hardpan, boulders, rock, pavements, rubbish, and all other materials within the excavation limits.

2. Excavations for structures and pipelines will be open excavations. Provide excavation protection system(s) required by ordinances, codes, law s, and regulations to prevent injury to workmen and to prevent damage to new and existing structures or pipelines. Unless shown or specified otherwise, protection system(s) will be utilized under the following conditions. a. Excavation Less Than 5 feet deep: Excavations in stable rock or in soil conditions where there is no potential for a cave-in may be made with vertical sides. Under all other conditions, excavations will be sloped and benched, shielded, or shored and braced.
b. Excavations More Than 5 feet deep: Excavations in stable rock where there is no potential for a cave -in may be made with vertical sides. Under all other conditions, excavations will be sloped and benched, shielded or shored and braced.
c. Excavation protection system(s) will be installed and maintained in accordance with the excavation plan submitted.

3. CONTRACTOR shall be made aware of the specific exc avation support suggestions detailed in the Geotechnical report.

B. Structural Excavation:

1. The elevation of the bottom of footings shown is approximate only. ENGINEER may order such changes in dimensions and elevations as may be required to secure a satisfactory footing.

2. Hand-trim all structure excavations to permit the placing of full widths and lengths of footings on horizontal beds. Rounded and undercut edges will not be permitted.

3. Excavations shall allow for aggregate base, forms, working space, installation of shoring or bracing or the safe sloping of banks.

C. Pipe Trench Excavation:

1. No more than 100 feet of trench may be opened in advance of pipe laying.

2. Minimize trench width to the greatest extent practical but conform to the following:

3. Sufficient to provide room for installing, jointing , and inspecting piping, but in no case wider at top of pipe than pipe barrel outside diameter plus 3 feet.

4. Enlargements at pipe joints may be made, if required, and approved by ENGINEER.

31 05 03-9
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

5. Sufficient for shoring and bracing, or shielding and dewatering.

6. Sufficient to allow thorough compaction of backfill adjacent to bottom half of pipe.

7. Depth of trench will be as shown. If required and approved by ENGINEER, depths may be revised.

D. Subgrades:

1. Subgrades for roadways, structures and trench bottoms shall be firm, dense, and thoroughly compacted and consolidated; free from mud, muck, and other soft or unsuitable materials; and remain firm and intact under all construction operations.

2. Subgrades that are otherwise solid, but which become soft or mucky on top due to construction operations, shall be reinforced with select fill.

3. The finished elevation of stabilized subgrades shall not be above subgrade elevations shown.

E. Material Storage: Stockpile satisfactory excavated materials in approved areas, until required for backfill or fill. Place, grade, and shape stockpiles for proper drainage.

1. Locate and retain soil materials away from edge of excavations.

2. Dispose of excess soil material and waste materials as specified hereinafter.

F. Unauthorized Excavation:

1. All excavation outside the lines and grades shown, and which is not approved by ENGINEER, together with the removal and disposal of the associated material is at the CONTRACTOR'S expense.

2. Unauthorized excavations shall be filled and compacted with select fill by the CONTRACTOR at his expense.

3.6 PLACEMENT OF FILL AND BACKFILL
A. General:

1. Backfill excavations as promptly as Work permits, but not until completion of the following:
a. Acceptance by the ENGINEER of construction below finish grade. b. Inspection, testing, approval, and recording of locations of underground piping and ductwork.
c. Removal of concrete formwork.
d. Removal of shoring and bracing, and backfilling of voids with satisfactory materials.
e. Removal of trash and debris.

2. Remove and replace with approved fill material, as specified, fill containing organic materials or other unacceptable material.

3. Compact all fill and backfill as specified in Subsection 3.7.

B. Structural Backfill:

1. Select fill shall be placed as structural backfill where shown on the Drawings or indicated herein.

2. Constraints:
a. Backfill water-holding basins or structures only after satisfactory leakage tests have been conducted as specified in Sections Concrete and Precast Concrete. b. No backfill or fill material shall be placed when free water is standing on the surface of the area.

31 05 03-10
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

c. No compaction of fill will be permitted with free water on any portion of the fill to be compacted.
d. No fill shall be placed or compacted in a frozen condition or on top of frozen material.
e. Any fill containing organic materials or other unacceptable material previously described shall be removed and replaced with approved fill material prior to compaction.

3. Levels of backfill against concrete walls are not to differ by more than 2 feet on either side of walls, unless walls are adequately braced, or all floor framing is in place up to and including grade level slabs.

4. Wherever a pipe passes through a structure backfill, the structure backfill shall be placed and compacted to an elevation 12 inches above the top of the pipe before the trench is excavated.

C. Backfill in Pipe Trenches:

1. Pipeline trenches may be backfilled prior to pressure testing, but no structure shall be constructed over any pipeline until it has been tested.

2. Unless otherwise shown, place all pipe on a minimum 6 inches thick layer of Granular Bedding. The bedding shall extend 12 inches above the top of the pipe.

3. Install bedding as follows:
a. Spread bedding and grade to provide a uniform and continuous support beneath the pipe at all points between bell holes or pipe joints. b. After each pipe section is placed, deposit and compact sufficient bedding material under and around each side of the pipe to hold the pipe in proper position and to maintain alignment during subsequent pipe jointing and bedding operations.
c. Bedding material shall be deposited and compacted uniformly and simultaneously on each side of the pipe to prevent lateral displacement. Then place and compact the bedding material to an elevation 12 inches above the top of pipe.

4. Above the level of bedding, place Select or Common Fill, as specified elsewhere in these specifications.

5. Controlled Low Strength Material (CLSM):
a. When CLSM pipe zone material is indicated, the pipe may be supported above the trench floor on pea gravel bags or sandbag supports. The CONTRACTOR shall demonstrate to the ENGINEER, 7 days prior to full pipeline backfill installation, placement of CLSM as described below. This demonstration shall occur on the first 300 feet of trench , The CLSM pipe zone material shall be installed as indicated.
1) Bedding and Embedment: Place and compact CLSM pipe zone material using the following techniques:
a) Following placement and anchoring of the pipe, remove all loose soil from trench walls and floor. Remove any unstable soil at the top of the trench which might fall into the trench during placement of the CLSM. b) Deliver the CLSM to the trench in ready mix trucks or traveling pug mill and utilize pumps or chutes to place the CLSM in the trench. Direct CLSM to one side of the pipe, taking care not to displace the pipe at any time.

Continue placing CLSM on one side of the pipe until CLSM has gone under the pipe and up the other side to a depth of 6 inches above the pipe bottom. Use at least two handheld vibrators to continuously liquefy and

31 05 03-11
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

move CLSM into all voids. Adjust water in mixture to maintain fluid consistency but maintain strength requirements. Continue placing CLSM on both sides of the pipe continuously using two vibrators for every 30 feet of pipe run.
c) Maintain stability of pipe and conduit throughout CLSM placement and curing. CLSM will likely require placement in lifts to prevent pipe flotation. No movement of the pipe caused by flotation will be allowed.

If any movement occurs, the CLSM material shall be removed and/or repaired in full conformance with these Contract Documents at no additional cost to the CITY. Remove all sloughed material or other debris from top of previously placed CLSM.
d) CLSM shall be allowed to cure a minimum of 4 hours prior to placing each lift as well as trench zone material. A smaller cure period will be allowed if it can be demonstrated to the ENGINEER that it will support the individual lift or trench zone material. The CLSM shall be sufficiently strong to sup port trench backfill material and the compaction effort required to achieve the specified compaction.

D. Marking Tape:

1. Continuously install marking tape along centerline of all buried piping, on top of last lift of pipe zone material unless otherwise shown. Coordinate with piping installation drawings. Install in accordance with manufacturer’s recommendations. a. Metallic Marking Tape: Install with nonmetallic piping and waterlines. Join ends with clips provided by the manufacturer.
b. Plastic Marking Tape: Install with metallic piping.

E. Pipe-Locating Wire:

1. Pipe-locating wire shall be provided for the entire length of all nonmetallic pipelines and shall be continuous around restrained joint sections.

2. Install pipe locating wire by strapping to the top of the pipe with PVC tape, polyethylene-backed tape, or tie locks. Test pipe locating wire with pipe locator equipment prior to final acceptance.

3. Stub the pipe -locating wire up inside each valve box or flush -mounted Type C corrosion monitoring stations. Sufficient excess length shall be provided at terminal connections to allow continuation of the pipe -locating wire to the terminal connection.

4. Wire splices shall be made with compression fittings or soldering; wrapped with Tac-Tape, Aqua -Seal, or equal, and wrapped with electrical tape. Prevent bare copper wire from contacting metallic appurtenances including, but not limited to, pipe, buried valves, or fittings.

F. Resume backfilling operations using the techniques described above to complete the pipe zone backfill. ENGINEER will approve the pipe zone backfill prior to initiating the trench zone backfill.

G. Embankments:

1. To the maximum extent available, use excess earth obtained from structure and trench excavations for construction of embankments. Obtain additional material from borrow pits, if such pits are shown, otherwise obtain additional material from offsite sources as necessary.

31 05 03-12
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Strip, scarify, level and roll the subgrade so that surface materials of the subgrade will be compact and well bonded with the first layer of the embankment.

3. Wherever a pipe is to pass through a fill or embankment, place and compact the fill or embankment material to an elevation 12 inches above the top of the pipe before the trench is excavated.

H. Crushed Stone:

1. Place where shown on the Drawings, to the limits shown.

2. Place in hand-tamped lifts, not to exceed 6 inches.

I. Replacement of Unacceptable Excavated Materials: In cases where over-excavation for the replacement of unacceptable soil materials is required, backfill the excavation to the required subgrade with select backfill material and thoroughly compacted.

3.7 COMPACTION
A. General:

1. Compaction by inundation with water will not be permitted.

2. Provide equipment capable of discing, aerating, and mixing the soil to ensure reasonable uniformity of moisture content throughout the material and to reduce the moisture content by air drying, if necessary.

3. Perform compaction with equipment suitable for the type of fill material being placed. Select equipment that is capable of providing the minimum density required by these Specifications. Use hand-operated compacting equipment within a distance of 3 feet from the wall of any completed below grade structure. Between 3 feet and 12 feet adjacent to below grade structures, compaction may be completed with lightweight compaction equipment weighi ng less than 15,000 pounds. Beyond 12 feet adjacent to below grade structures, there are no equipment weight restrictions.

Provide equipment that is capable of compacting in restricted areas next to structures and around piping.

B. Compaction Density Requirements: The degree of compaction required for several types of fill is listed below. Moistened or aerated material as necessary to provide the moisture content specified, or if not specified, that will facilitate obtaining the specified compaction.

MATERIAL Required
Minimum Density
(ASTM D 1557)
Maximum
Uncompacted Lift*
Common Fill/Prepared Subgrade: 90% 8 inches
Select Fill/Trench Backfill above pipe:

More than 2 feet below final grade 90% 8 inches
Less than 2 feet below final grade 95% 8 inches
Aggregate Base: 95% 8 inches
Granular Bedding 90% 6 inches
Sand 90% 6 inches
Gravel Surfacing 95% 6 inches

31 05 03-13
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

*Where large areas of backfill allow for use of large, heavy equipment, ENGINEER may, at their option, allow uncompacted lifts up to 12 inches.

C. Moisture Content: All fill and backfill shall be prepared and thoroughly mixed to achieve optimum moisture content, ±3%, with the following exception: On site clayey soils optimum to +3%.

D. Testing: Testing will be as specified under Paragraph 3.10, “Field Quality Control”.

3.8 GRADING
A. General:

1. Uniformly grade areas within limits of grading under this Section, including adjacent transition areas.

2. Smooth subgrade surfaces within specified tolerances, and compact with uniform levels or slopes between points where elevations are shown or between such points and existing grades.

B. Adjacent to Structures: Grade areas adjacent to structures to drain away from structures (including masonry fences) and to prevent ponding.

C. Walks: Shape surface of areas under walks to line, grade and cross-section, with finish surface not more than 1 inch above or below the required subgrade elevation.

D. Pavements: Shape surface of areas under pavement to line, and grade and cross-section with finish surface not more than ½ inch above or below the required subgrade elevation.

E. Under Building Slabs: Grade smooth and even, free of voids, compacted as specified and to required elevation. Provide final grades within a tolerance of ½ inch when tested with a 10-foot straightedge.

F. Special Areas: In turfed areas or areas covered with gravel, stone, wood chips, or other special cover, grade to within not more than 1 inch above or below the required subgrade elevations.

G. Compaction: After grading, compact subgrade surfaces to the depth and percentage of maximum density for each area classification.

Area Required Minimum Density
(ASTM D 1557)
Beneath Treatment Structures and
Buildings
95%
Beneath Pavement 90%
Landscaped and other areas 85%

3.9 PAVEMENT BASE COURSE
A. Shoulders:

1. Place shoulders along edges of base course to prevent lateral movement.

31 05 03-14
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

2. Construct shoulders of acceptable soil materials, placed in such quantity to compact to thickness of each base course layer.

3. Compact and roll at least a 12 -inch width of shoulder simultaneously with compacting and rolling of each layer of base course.

B. Placing:

1. Place base course material on prepared subgrade in layers of uniform thickness conforming to indicated cross-section and thickness.

2. Maintain optimum moisture content for compacting base material during placement operations.

3.10 FIELD QUALITY CONTROL
A. General: Testing by a testing laboratory of materials, testing for moisture content during placement and compaction of fill materials, and of compaction requirements for compliance with technical requirements of the Specifications.

B. The CONTRACTOR shall retain one or more independent testing agencies to perform all quality control testing required for all materials except portland cement concrete. The required testing is for soil, aggregates, imported gravel, aggregate base, asphalt concrete, and CLSM. Each independent testing agency shall perform the testing under the supervision of an engineer registered in California. Technicians performing the testing shall be certified to operate the equipment and have at least 1 full year of experience in the type of tests being performed.

C. A Quality Control Plan shall be submitted by the CONTRACTOR to the ENGINEER at least 30 days before field testing is required. It shall include the names, addresses, and phone number of the companies, the major personnel that will be involved, and resumes of the individuals that will be supervising and performing the tests. Copies of certificates held by the companies and the testing personnel shall be included.

D. CONTRACTOR’s independent testing agency shall perform all field and laboratory testing as described in these Specifications. Test shall include specific gravity, sand equivalent, durability, abrasion resistance, soundness, gradation, compaction curves, lab and field moisture contents, compressive strength, and field density. Other tests shall be performed by the CONTRACTOR’s independent testing agency as may be required to meet the Specifications. Mix design testing for portland cement concrete, CLSM, and asphalt concrete shall also be performed by the CONTRACTOR. Field testing for portland cement concrete will be performed by the ENGINEER.

E. CONTRACTOR shall schedule all lab testing so that materials arriving at the site have been approved by the ENGINEER for use on the Project.

F. All lab tests shall be performed on Samples obtained from the source of actual material that will be used on the Project. No test results more than 90 days old shall be submitted for review.

G. The location of field density tests shall be determined by the ENGINEER.

H. Frequency of tests: Frequency will be not less than as follows:

1. For trenches:

31 05 03-15
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

a. In open fields: 2 locations every 1,000 linear feet, for each layer b. Along dirt, gravel, or paved roads or off traveled right-of-way: 2 locations every 500 linear feet, for each layer
c. Crossing roads: 2 locations along each crossing, for each layer

2. For structural backfill: 1 every 50 cubic yards.

3. In embankment or fill: 1 every 200 cubic yards.

4. Base material: 1 every 50 cubic yards.

5. Footing Subgrade: 1 every 50 linear feet, for each layer.

6. Paved Areas and Building Slab Subgrade: 1 every 500 square feet, but in no case less than 3 tests, for each layer.

I. The ENGINEER may modify the frequency or spacing of tests to provide for testing at specific structures or locations where the ENGINEER deems additional testing is required. The CONTRACTOR shall perform such additional testing up to 10% above the frequency and total number of tests specified at no additional cost to the CITY.

J. Verbal and hand -written test results shall be provided to the ENGINEER and CONTRACTOR immediately following the field testing. Written test data sheets shall be provided to the ENGINEER not more than 12 hours following completion of the field test. Typed lab test results shall be provided to the ENGINEER not more than 7 calendar days following completion of the tests . However, the results must be reviewed and approved by the ENGINEER prior to placing the material in the trenches or incorporating it in the Work.

A. Any location where a failing test occurs shall be recompacted and retested until a passing test is obtained. Specified testing values are minimums and no tests shall be accepted below the specified minimums. No material shall be placed over the failing test area until the failing material is recompacted and a passing test is obtained and the area is approved by the ENGINEER. The limits of the failing test shall be assumed to be halfway between the failing location and the nearest passing location. Additiona l tests may be taken to determine the limits of unsatisfactory compaction.

B. At the first of each month, the CONTRACTOR shall provide to the ENGINEER a typed summary of all tests performed for the previous month including test location by station, depth below finished grade, material tested, wet density, moisture content, dry density, maximum density curve used, and percent relative compaction. Lab test results shall also be included in the monthly report with clear description of material tested, intended use on the Project, and a statement of compliance or noncompliance with the Project Specifications.

C. Any material which does not meet the Specifications shall be removed from the site and replaced with material in compliance.

D. Material which has been softened or modified prior to placing the overlying lift shall be removed down to material which is in compliance.

3.11 DISPOSAL OF EXCAVATED MATERIALS
A. Material removed from the excavations that does not conform to the requirements for fill or is in excess of that required for backfill shall be hauled away from the Work site

31 05 03-16
Earthwork
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

and disposed of by CONTRACTOR in compliance with ordinances, codes, laws and regulations at no additional cost to the CITY.

B. Any uncontaminated material can be hauled to 1800 Booth Road. ++ END OF SECTION ++

31 11 03-1
Site Preparation
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 31 11 03

SITE PREPARATION
PART 1 - GENERAL

1.1 DEFINITIONS
A. Interfering or Objectionable Material: Trash, rubbish, and junk; vegetation and other organic matter, whether alive, dead, or decaying; topsoil.

B. Clearing: Removal of interfering or objectionable material lying on or protruding above ground surface.

C. Grubbing: Removal of vegetation and other organic matter including stumps, buried logs, and roots greater than 0.5 inch caliper to a depth of 6 inches below subgrade.

D. Stripping: Removal of topsoil remaining after applicable scalping is completed.

E. Project Limits: Areas, as shown or specified, within which Work is to be performed.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.1 GENERAL
A. Clear, grub, and strip areas actually needed for waste disposal, borrow, or site improvements within limits shown or specified.

B. Do not injure or deface vegetation that is not designated for removal.

3.2 LIMITS
A. As follows, but not to extend beyond Project limits.

1. Excavation 5 feet beyond top of cut slopes.

2. Trench Excavation: 4 feet from trench centerline, regardless of actual trench width.

3. Waste Disposal:
a. Clearing: 5 feet beyond perimeter.
b. Scalping and Stripping: Not required.
c. Grubbing: Around perimeter as necessary for neat finished appearance.

4. Structures: 5 feet outside of new structures.

5. Roadways: Clearing , grubbing and stripping 50 feet from centerline.

6. Overhead Utilities:
a. Clearing and Grubbing: Entire width of easements and rights-of-way. b. Scalping and Stripping: Wherever grading is required.

7. Other Areas: As shown.

31 11 03-2
Site Preparation
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Remove rubbish, trash, and junk from entire area within Project limits.

3.3 CLEARING
A. Clear areas within limits shown or specified.

B. Fell trees so that they fall away from facilities and vegetation not designated for removal.

C. Cut stumps not designated for grubbing flush with ground surface.

D. Cut off shrubs, brush, weeds, and grasses to within 2 inches of ground surface.

3.4 GRUBBING
A. Grub areas within limits shown or specified.

3.5 STRIPPING
A. Do not remove topsoil until after scalping is completed.

B. Strip areas within limits to minimum depths shown or specified. Do not remove subsoil with topsoil.

3.6 DISPOSAL
A. Clearing and Grubbing Debris: Dispose of debris offsite.

B. Strippings:

1. Dispose of strippings that are unsuitable for topsoil or that exceed quantity required for topsoil offsite or approved by ENGINEER.

2. Stockpile topsoil in sufficient quantity to meet Project needs. Dispose of excess strippings as specified for clearing and grubbing.

++ END OF SECTION ++

32 12 16-1
Asphalt Concrete Pavement
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 32 12 16

ASPHALT CONCRETE PAVEMENT
PART 1 - GENERAL

1.1 SUBMITTALS
A. Information Submittals:

1. Asphalt Concrete Mix Formula:
a. Submit minimum of 15 days prior to start of production. b. Submittal to include the following information:
1) Gradation and portion for each aggregate constituent used in mixture to produce a single gradation of aggregate within specified limits. 2) Bulk specific gravity for each aggregate constituent. 3) Measured maximum specific gravity of mix at optimum asphalt content determined in accordance with ASTM D2041.
4) Percent of asphalt lost due to absorption by aggregate. 5) Percentage of asphalt cement, to nearest 0.1 percent, to be added to mixture. 6) Optimum mixing temperature.
7) Optimum compaction temperature.
8) Temperature-viscosity curve of asphalt cement to be used.

2. Test Report for Asphalt Cement:
a. Submit minimum 10 days prior to start of production. b. Show appropriate test method(s) for each material and the test results.

3. Statement of qualification for independent testing laboratory.

4. Test Results:
a. Mix design.
b. Asphalt concrete core.
c. Gradation and asphalt content of uncompacted mix.

1.2 QUALITY ASSURANCE
A. Qualifications:

1. Independent Testing Laboratory: In accordance with ASTM E329.

2. Asphalt concrete mix formula shall be prepared by approved certified independent laboratory under the supervision of a certified asphalt technician.

1.3 ENVIRONMENTAL REQUIREMENTS
A. Temperature: Do not apply asphalt materials or place asphalt mixes when ground temperature is lower than 10 degrees C (50 degrees F) or air temperature is lower than 4 degrees C (40 degrees F). Measure ground and air temperature in shaded areas away from heat sources or wet surfaces.

B. Moisture: Do not apply asphalt materials or place asphalt mixes when application surface is wet.

32 12 16-2
Asphalt Concrete Pavement
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

PART 2 - PRODUCTS

2.1 MATERIALS
A. Asphalt Material: Conform to the following specification:

1. Asphalt Material shall be a hot mix asphalt concrete, consisting of a mixture of mineral aggre gate and paving asphalt conforming to Section 92 of the Caltrans Standard Specifications, PG 64-10.

B. Seal Coat: Conform to the following specification:

1. Seal coat material shall be conforming to Section 37 of the Caltrans Standard Specifications.

PART 3 - EXECUTION

3.1 GENERAL
A. Traffic Control:

1. In accordance with all applicable specification sections and laws.

2. Minimize inconvenience to traffic, but keep vehicles off freshly treated or paved surfaces to avoid pickup and tracking of asphalt.

B. Driveways: Repave driveways from which pavement was removed. Leave driveways in as good or better condition than before start of construction.

3.2 LINE AND GRADE
A. Provide and maintain intermediate control of line and grade, independent of underlying base, to meet finish surface grades and minimum thickness.

B. Shoulders: Construct to line, grade, and cross-section shown.

3.3 PREPARATION
A. Prepare subgrade as specified.

B. Thoroughly coat edges of contact surfaces with emulsified asphalt or asphalt cement prior to laying new pavement. Prevent staining of adjacent surfaces.

3.4 PAVEMENT APPLICATION
A. General: Place asphalt concrete mixture on approved, prepared base in conformance with this section.

B. Pavement Mix:

1. Prior to Paving:
a. Sweep primed surface free of dirt, dust, or other foreign matter. b. Patch holes in primed surface with asphalt concrete pavement mix.

2. Place asphalt concrete pavement mix in one single lift.

3. Total Compacted Thickness: 3 inches.

32 12 16-3
Asphalt Concrete Pavement
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

4. Apply such that meet lines are straight and edges are vertical.

5. Collect and dispose of segregated aggregate from raking process. Do not scatter material over finished surface.

6. After placement of pavement, seal meet line by painting a minimum of 150 millimeters (6 inches) on each side of joint with cut-back or emulsified asphalt.

Cover immediately with sand.

C. Compaction: Roll until roller marks are eliminated and density of 92 percent of measured maximum density determined in accordance with ASTM D2041.

D. Tolerances:

1. General: Conduct measurements for conformity with crown and grade immediately after initial compression. Correct variations immediately by removal or addition of materials and by continuous rolling.

2. Completed Surface or Wearing Layer Smoothness:
a. Uniform texture, smooth, and uniform to crown and grade. b. Maximum Deviation: 1/8 inch from lower edge of a 3.6 -meter (12 -foot) straightedge, measured continuously parallel and at right angle to centerline. c. If surface of completed pavement deviates by more than twice specified tolerances, remove and replace wearing surface.

3. Transverse Slope Maximum Deviation: 1/4 inch.

E. Seal Coat:

1. General: Apply seal coat of paving grade or emulsified asphalt to finished surface at longitudinal and transverse joints, joints at abutting pavements, areas where asphalt concrete was placed by hand, patched surfaces, and other areas as directed by ENGINEER.

2. Preparation:
a. Surfaces that are to be sealed shall be maintained free of holes, dry, and clean of dust and loose material.
b. Seal in dry weather and when temperature is above 2 degrees C (35 degrees F).

3. Application:
a. Fill cracks over 1.5 millimeters (1/16 inch) in width with asphalt -sand slurry or approved crack sealer prior to sealing.
b. When sealing patched surfaces and joints with existing pavements, extend minimum 150 millimeters (6 inches) beyond edges of patches.

++ END OF SECTION ++

32 12 16-4
Asphalt Concrete Pavement
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

THIS PAGE INTENTIONALLY LEFT BLANK

33 01 21-1
Sewer Pipeline Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

SECTION 33 01 21

SEWER PIPELINE CLEANING
PART 1 - GENERAL

1.1 DESCRIPTION
A. The intent of sewer pipeline cleaning is to remove foreign materials from the line prior to CCTV inspection and subsequent pipe bursting per Specification Section 33 05 26.

Since the success of this phase of work depends a great deal on the cleanliness of the lines, the importance of this phase of the operation is emphasized. It is recognized that there may be some conditions such as broken pipe and major blockages that prevent cleaning from being accomplished some of which are noted in the Drawings or where additional damage would result if cleaning were attempted or continued. Should such conditions be encountered, the CONTRACTOR will notify the ENGINEER before finalizing the decision to not complete mechanical cleaning on the pertinent pipeline.

1.2 SUBMITTALS
A. Submit for approval, prior to commencement of work, a list of sewer cleaning equipment to be used including manufacturers’ specifications for each piece of equipment (e.g., truck) and its associated tools (e.g., nozzles).

1.3 QUALIFICATIONS
A. Pre-qualification shall require that the contracting company and the job supervisor each have a minimum of three (3) years experience in the performance of the type of work specified and shall have specifically performed at least 100,000 feet of cleaning within the past three years. A company with less than three (3) years experience may pre- qualify if they can demonstrate to the satisfaction of the ENGINEER that they have the capabilities, overall experience, equipment, and expertise to satisfactorily complete the project in accordance with these specifications. Documentation supporting the minimum experience of the contracting company shall be submitted with the proposal.

PART 2 - PRODUCTS

2.1 CLEANING EQUIPMENT
A. The equipment shall be capable of removing dirt, grease, rocks, sand, roots, and other materials and obstructions from sewer lines and manholes. Alternatives to equipment described herein require approval by ENGINEER prior to commencing work. The following requirements for the cleaning equipment must be met:

33 01 21-2
Sewer Pipeline Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. High-velocity hydraulic equipment (hydroflusher) shall be truck or trailer mounted. The equipment shall carry a nominal 800 gallon minimum water tank and have a minimum of 650 feet of high-pressure hose with a selection of two or more cleaning nozzles. The equipment shall be capable of supplying water at minimum 30 gallons per minute at a minimum working pressure of 750 pounds per square inch (psi), and regulated to not exceed a maximum pressure of 1,500 psi. All controls shall be located so that the equipment can be operated above ground at minimal interference to existing traffic and/or danger to the operator.

1. The nozzles shall be capable of producing a scouring action for any pipeline size scheduled to be cleaned.

2. Hydraulically propelled equipment such as root saws or rotating chain flails may be used upon approval by ENGINEER for each line segment.

3. Hydraulically propelled equipment such as sewer balls or movable dams shall not be used.

4. Due to possible accessibility constraints, additional lengths of high-pressure hose may be required.

5. It shall be CONTRACTOR’s responsibility to provide all equipment required to complete cleaning work.

C. Vacuum truck shall be a minimum 27-inch mercury (high-vacuum unit) with a positive displacement blower, which produces a minimum of 3500 CFM air flow, 8-inch suction tubes, and 16 cubic yards of hauling capacity for debris and water mixture.

2.2 MECHANICAL CLEANING EQUIPMENT
A. Alternative mechanically powered cleaning equipment proposed for use by CONTRACTOR shall require approval by CITY and/or CITY’s Representative (e.g.

ENGINEER) prior to commencing work. Examples include, but are not limited to, power rodding machines and bucket machines.

B. CONTRACTOR shall be responsible for any damage to the sewer or any service connections as a result of using mechanically powered cleaning equipment, including rehabilitation and/or replacement of sewer pipeline to CITY’s satisfaction.

PART 3 - EXECUTION

3.1 SAFETY
A. Conduct operations during all phases of work to ensure public safety and in such a manner as to cause as little inconvenience as possible to the traveling public and abutting property owners. Convenient access to driveways, houses, and buildings along the line of work shall be maintained.

33 01 21-3
Sewer Pipeline Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

B. Submit a site-specific Health and Safety Plan for the work to be performed in accordance with OSHA requirements.

C. CONTRACTOR shall follow all manufacturer’s instructions/recommendations for operation and maintenance of cleaning equipment and related appurtenances.

D. Precautions shall be taken to ensure that the water pressure created does not damage or cause flooding of public or private property being served by the sewer.

3.2 CLEANING
A. Flush and clean pipeline interiors to remove sludge, dirt, sand, grit, stone, grease, roots, and other materials from pipe such that successful CCTV inspection of the pipes outlined in the Drawings can be performed per Specification Section 33 01 31, Sewer Pipeline CCTV Inspection.

B. A minimum of one operator and one laborer shall be at the job site at all times when cleaning is being performed.

C. Selection of the equipment to be used shall be based on the conditions of the pipeline segment at the time the work commences and in accordance with the requirements within this specification.

D. CONTRACTOR shall be responsible for and repair any damage caused by their operations at no additional cost to the CITY and to the CITY’s satisfaction.

E. High-velocity Hydraulic Cleaning:

1. All hydraulic cleaning equipment shall be truck mounted. Water jet cleaning equipment shall include a water tank, auxiliary engine, pumps, and hydraulically driven hose reel. The CONTRACTOR shall provide a minimum of 650 feet of high- pressure hose.

2. CONTRACTOR shall provide a selection of high velocity nozzles, each having a flow capacity and working pressure necessary to clean the pipe thoroughly while preventing sewer backups and impacts to nearby residences. Pressure to the nozzle shall be regulated by a relief valve to prevent backing up into existing structures.

3. Nozzles shall be capable of producing a jet stream angle of 15 to 45 degrees from the horizontal. The CONTRACTOR shall also provide a high velocity gun with sufficient discharge and pressure to thoroughly clean manhole interiors.

4. CONTRACTOR shall clean contiguous pipe segments in order from upstream to downstream.

5. When hydraulic cleaning equipment is used for the purpose of completing scheduled cleaning, the CONTRACTOR shall clean the pipeline with as many passes of a high-

33 01 21-4
Sewer Pipeline Cleaning
Church Street and Pump Station 26 Collections System Improvements Project City of Roseville April 2024
WWE Project: 23-056 BID SET

velocity hydraulic cleaning machine as necessary until all debris is removed from the pipe.
a. CONTRACTOR shall subdivide individual manhole to manhole pipe segments into partial segments no more than 100-foot in length and clean downstream partial segment first then next upstream partial segment all the way to downstream manhole and continue this procedure until cleaning of entire manhole to manhole segment is complete.

6. CONTRACTOR shall be responsible to plan and control the cleaning operations to prevent flooding and/or damage of the sewers and manholes, and to prevent backflow into building structures through sewers and/or laterals.

F. Whenever lines to be cleaned show evidence of being more than one-half filled with solids at the upstream or downstream manhole, and removal of said solids is not possible with handheld tools such as scoops, shovels, and/or clam shovels, bucket machines or power rodding machines shall be utilized to remove most of the materials before hydraulic equipment is brought into use for finishing the cleaning of the pipeline.

As previously stated in Paragraph 2.2, the CONTRACTOR shall acquire approval by CITY or CITY’s Representative prior to commencing work with bucket machines or power rodding machines.

1. If bucket or rodding machine is required and approved, that equipment shall be run the entire length of the manhole to manhole segment until CONTRACTOR deems solids level is low enough such that additional passes of a high velocity hydraulic cleaning machine will complete cleaning.

2. Power rodding machines shall be a "continuous rod" type capable of rodding distances of up to 650 feet in one setup. Rodding machines shall have the ability to spin the rod either clockwise or counterclockwise and be able to be pushed straight out or pulled back without rotating the machine. It shall be capable of pulling pipe- size swabs or brushes back through the sewer for cleaning and flushing purposes.