Cities Index.
Item 15 2024-01574 Third-Party Appeals of the Planning and Design Commission’s Determination of Exemption under California Environmental Quality Act for American River One (DR22-238) [Noticed on 09/06/2024]

Sacramento City Council
September 17, 2024

Document
Item 15 2024-01574 Third-Party Appeals of the Planning and Design Commission’s Determination of Exemption under California Environmental Quality Act for American River One (DR22-238) [Noticed on 09/06/2024]
Meeting
September 17, 2024
Body
Sacramento City Council
Pages
97
Original file
57.4 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21006
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County at SB Sac-99 to NB I-5. Implement
connector metering and extend aux lane.

In Sacramento County at SB Sac-99 to NB I-5. Implement connector metering and extend accel. lane. (PMR32.2) $ 700,000 Post-2040
CAL21289 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County at various locations from freeway to freeway. Install 6 Master Traffic Monitoring Stations to capture all major interchanges Ramps detection. Fwy to fwy connector CMS.

In Sacramento County at various locations from freeway to freeway. Install 6 Master Traffic Monitoring Stations to capture all major interchanges Ramps detection. Fwy to fwy connector TMS. SHOPP ID 18157 $ 4,200,000 $ 5,376,355 2026-2030 CAL21004 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County in the City of Galt from the county line to Cosumnes River Bridge. Install new Fiber Optics, upgrade existing ITS, and install new ITS elements. Sac 99 Fiber/ITS In Sacramento County in the City of Galt from the county line to Cosumnes River Bridge: Install new Fiber Optics, upgrade existing ITS, and install new ITS elements. SHOPP ID 18167 $ 6,300,000 $ 8,064,533 2026-2030 CAL20840 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County in the City of Sacramento from county line to ED County Line. Ramp metering, extend aux lanes. US 50 ICM-Segment 2: Comm Detection, ITS Elements, Ramp meter upgrades
US-50 In Sacramento County in the City of Sacramento from county line to ED County Line. Upgrade 22 ramp metering systems. Widen Ramps at WB Sac-50 SB Bradshaw, SB Mather and NB Mather and extend accel. lanes. US 50 ICMSegment 2: Comm Detection, ITS Elements, RM upgrades. SHOPP ID 18166 $ 9,700,000 $ 10,445,839 2020-2025 CAL20841 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County near the City of Sacramento at NB Onramp at EB Florin Road. Add HOV Ramp Meter Lane. EB Florin to NB 99
In Sacramento County near the City of Sacramento at NB On-ramp at EB Florin Road. Add HOV Ramp Meter Lane. EB Florin to NB 99. SHOPP ID 18172 $ 2,350,000 $ 3,008,199 2026-2030 CAL21291
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County on Route 5. Ramp Meter/Aux
Improvements.

In Sacramento County on Route 5. Ramp Meter/Aux Improvements. SHOPP ID 18498 $ 380,000 Post-2040
CAL21031 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation
In Sacramento County on Route 50 from Watt Ave to 0.5 miles east of Folsom Blvd. Pavement Rehab.

In Sacramento County on Route 50 from Watt Ave to 0.5 miles east of Folsom Blvd. Pavement Rehab. SHOPP ID 18816 $ 86,500,000 $ 110,727,313 2026-2030 CAL21232 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation
In Sacramento County on Route 50 in Sacramento from Folsom Blvd UC to Occidental dr OC Roadside Restoration $ 1,250,000 $ 2,048,271 2036-2040 CAL21003 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento County on Route 80 at various locations from county line to county line. Sac 80 Fiber
In Sacramento County on Route 80 at various locations from county line to county line. SHOPP ID 18160 $ 13,400,000 $ 17,153,133 2026-2030 CAL20956
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento from the E Street UC (Br#24-192 R/L) to the American River Bridge (Br#24-3). Construct auxiliary lanes.

In Sacramento from the E Street UC (Br#24-192 R/L) to the American River Bridge (Br#24-3). Construct accel lanes. SHOPP 16134 $ 3,960,000 Post-2040 CAL20972 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
In Sacramento, from Elk Grove Blvd to US 50, From Arden to Marconi, at Antelope Interchange and from I-80 to Pioneer Bridge. Install ramp meters.

In Sacramento, from Elk Grove Blvd to US 50, From Arden to Marconi, at Antelope Interchange and from I-80 to Pioneer Bridge. Install ramp meters.

SHOPP 16939 $ 16,025,000 $ 20,513,355 2026-2030
CAL21194 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install connector ramp meter SB 51 to EB 50 SR 51 In Sacramento County on connector ramp at SB 51 to EB 50 Install connector ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL21196 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install connector ramp meter SB 51 to WB 50 SR 51 In Sacramento County on connector ramp at SB 51 to WB 50 Install connector ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL21193 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Connector Ramp Meter - SB 5 to EB 50 I-5 In Sacramento County on connector ramp at SB 5 to EB 50 Install connector ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL21195 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Connector Ramp Meter - SB 5 to WB 50 I-5 In Sacramento County on connector ramp at SB 5 to WB 50 Install connector ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL21174 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB 5 to EB 80 EB Install Meter - NB 5 to EB 80 EB $ 1,940,000 $ 2,741,169 2031-2035 CAL20897 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB 5 to EB 80 EB Install Meter - SB 5 to EB 80 EB $ 1,940,000 $ 2,741,169 2031-2035 CAL21175 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB Watt Ave RT Station Install Meter - EB Watt Ave RT Station $ 300,000 $ 491,585 2036-2040

Page 33 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21268 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB West El Camino Rd WB Install Meter - EB West El Camino Rd WB $ 300,000 $ 423,892 2031-2035 CAL21176 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB I5 to WB 80 WB Install Meter - NB I5 to WB 80 WB $ 1,940,000 $ 2,741,169 2031-2035 CAL20898 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB I5 to WB 80 WB Install Meter - SB I5 to WB 80 WB $ 1,940,000 $ 2,741,169 2031-2035 CAL21250 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB West El Camino Rd WB Install Meter - WB West El Camino Rd WB $ 3,000,000 $ 4,238,921 2031-2035 CAL21233 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
Install Ramp Meters at various location in Sacramento, Placer and Yolo counties
I-5 (SB) Diagonal Ramp Meter in Sac County - I Street (PM 23.64) I-80 (EB) Diagonal Ramp Meter in Yolo County - Richards Blvd (PM 0.451) SR 51 (SB) Loop Ramp Meter in Sac County - Arden Way (PM 4.068) SR 99 (SB) Diagonal Ramp Meter in Sac County - EB Elkhorn Blvd (PM 33.18) SR 99 (SB) Loop Ramp Meter in Sac County - WB Elk Horn Blvd (PM33.41) SR 65 (NB) Loop Ramp Meter in PLA county - Pleasant Grove Blvd (PM R7.14) $ 380,000 $ 622,674 2036-2040 CAL21021
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
Marconi to SB-51. Add meter, change config from 1 to 2+1, add aux.

Marconi to SB-51. Add meter, change config from 1 to 2+1, add aux. SHOPP ID 18474 $ 4,010,000 Post-2040
CAL21027
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS NB Watt to NB 51. Change config to 2+1, add aux. NB Watt to NB 51. Change config to 2+1, add aux. SHOPP ID 18483 $ 4,010,000 Post-2040 CAL20669 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SAC 05/80 Bridge Deck Rehab and Rail Upgrade I-5, Florin Road OC (Br #24-0264) and on I-80 Del Paso OH Bridges R/L (Br #24- 0193R/L) - Perform deck maintenance and rehab of three bridges $ 10,230,000 $ 15,186,492 2036-2040 CAL20696 Programmed SAC Caltrans D3
G- System
Management,
Operations, and ITS Sac/Yol Upgrade MBGR
In Sacramento County on Routes 5, 80 and 99 at various locations (PM

0.1/34.6); also in Yolo County on Route 80 (PM 0.0/R11.7) - Upgrade guard rail to current standards (Toll Credits). Toll Credits for ENG, ROW, CON $ 3,605,000 2020-2025 CAL20789 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation Sacramento Bridge Rail Upgrade - Various Locations In and near the City of Sacramento on I-80 from west of Rio Linda Blvd. UC #24- 0203 to east of Winters St. UC #24-0205 (PM M6.5/M8.8); also on SR 51 from south of SR 51/244/I-80 Separation #24-0291L to north of SR 51/244/I-80 Connector #24-0293R (PM 8.2/8.6): Upgrade bridge rails at four (4) structures and widen for standard shoulders. EA 1H910 $ 29,210,000 2026-2030 CAL20471 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation Sacramento Seismic Retrofit on Various Bridges In the City of Sacramento, on SR 160, at Sacramento River Bridge #24-0053 and North Sacramento Undercrossing #24-0111L; also in San Joaquin County, at Mokelumne River Bridge #29-0197R/L - Seismic retrofit (PM 20.9) [CTIPS ID 107-0000-0908] (Toll Credits). Toll Credits for ENG, ROW, CON $ 38,681,000 2020-2025 CAL20699 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation Sac-Var Seismic Retrofit Two Structures
In the City of Sacramento, at Southbound Route 99/5 Connector Overcrossing #24-0241F (PM R32.1); also on Route 80 at Longview Ramp Overcrossing #24- 0281K (PM M9.15) - Seismic retrofit two structures [CTIPS ID 107-0000-1043] (Toll Credits). Toll Credits for ENG $ 3,689,000 2020-2025 CAL21026
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS SB Watt to NB 51. Change config to 1+1, add aux. SB Watt to NB 51. Change config to 1+1, add aux. SHOPP ID 18482 $ 2,690,000 Post-2040

Page 34 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21022
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS SB Watt to SB-51. Change config to 1+1, add aux. SB Watt to SB-51. Change config to 1+1, add aux. SHOPP ID 18476 $ 2,690,000 Post-2040 CAL20867 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 104 Pavement Rehabilitation
In Sacramento County on Route 104 from 104/99 Junction to the county line.

SHOPP ID 20549 $ 16,940,000 $ 21,155,739 2026-2030
CAL20507 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 12 Bridge Rehab Near Rio Vista
SR 12 In Sacramento and Solano counties, near Rio Vista, at Sacramento River Bridge #23-0024 - Clean and repaint steel surfaces (PM 0.0/0.4) [EFIS ID 0313000139; CTIPS ID 107-0000-0961] [Total Project Cost $22,705,000 in 16/17 FY] (Toll Credits for PE). EA 3F570 $ 37,057,000 2020-2025 CAL20427 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 12 Operational Improvements
SR 12 Roadway Operational and Safety Improvements: Rio Vista to San Joaquin County line. Improvements will be coordinated with San Joaquin and Solano counties and anticipated corridor improvements. $ 10,000,000 $ 11,596,934 2026-2030 CAL21282 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 12 Pavement Rehabilitation
In Sacramento County, near Rio Vista from the Sacramento River Bridge #23-24 to the Mokelumne River Bridge #29-43 (PM 0.3/6.1). EA 2F800 $ 40,000,000 $ 4,652,015 2026-2030 CAL21303 Planned SAC Caltrans D3
B- Road & Highway
Capacity SR 16 Relinquishment Phase 2
In Sacramento County and City of Rancho Cordova, from South Watt Ave to East of Grant line Road. Relinquish roadway (PM 4.16/12.74). EA 1H410 $ 2,100,000 2020-2025 CAL21218 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Electrical & Mechnical Repairs
In Sacramento County at four bridges, Paintersville Bridge (Br# 24-0053), Isleton Bridge (Br# 24-0051), Steamboat Slough (Br# 24-0052), and Three Mile Slough (Br #24-121): Repair and modernize electromechanical bridge systems and incidental work. EA 4H950 $ 20,460,000 $ 652,823 2020-2025 CAL21030 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Mitigation
Giant Garter Snake mitigation south Sacramento County, east of Sacramento River. EA 4H770 $ 1,700,000 $ 1,876,482 2020-2025
CAL20862 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Pavement Rehabiliation A
In Sacramento County on Rte 160 from Walker Landing Rd to approx 0.1 mile south of River Rd. (PM 9.6-35.0) $ 23,900,000 $ 28,409,590 2026-2030 CAL21047 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Pavement Rehabiliation B
In Sacramento County in Route 160 from Jct Rte 12 to approx 0.1 mile north of Poverty Road. CAPM. (PM R0.0/6.0) SHOPP ID 20539 $ 3,760,000 $ 4,695,725 2026-2030 CAL21046 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Pavement Rehabiliation C
In Sacramento County on Route 160 from the county line to Jct Rte 12. (PM L0.0/L10.8) SHOPP ID 20529 $ 13,500,000 $ 22,121,322 2036-2040 CAL20873 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 160 Roadside Planting Improvement
In Sacramento County on Route 160 from Del Paso to Tribute Rd. Highway Planting Rehab. SHOPP ID 20606 $ 1,300,000 $ 2,130,201 2036-2040 CAL21059 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 220 Pavement Rehabiliation In Sacramento County on Route 220 from county line to Jct 160. $ 3,000,000 $ 3,566,057 2026-2030 CAL20597
Project
Development Only SAC Caltrans D3
B- Road & Highway
Capacity SR 51 Transition Lane
Construct a SB transition lane on SR 51 SB from Exposition Blvd. slip off-ramp to Exposition Blvd. loop on-ramp. $ 12,500,000 Post-2040 CAL21263 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 (NB) Hook Ramp Meter at the Howe Ave interchange In the City of Sacramento construct a hook ramp meter at the SR 51/Howe Ave interchnage (NB) (PM 5.945) $ 380,000 $ 622,674 2036-2040 CAL20909 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 51 (NB) transition lane from El Camino Ave slip on ramp to Marconi Ave
In the City of Sacramento construct SR 51 (NB) transition lane from El Camino Ave slip on ramp to Marconi Ave $ 1,500,000 $ 2,119,461 2031-2035 CAL21239 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 (SB) Diagonal Ramp Meter at Marconi Avenue In the City of Sacramento construct a diagonal ramp meter at the SR 51/Marconi Avenue interchange (SB) (PM 5.374) Future configuration is a 2+1.

SHOPP ID 18474 $ 4,010,000 $ 440,683 2026-2030
CAL21135 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 (SB) transition lane from E Street to J Street In the City of Sacramento construct SR 51 (SB) transition lane from E Street to J Street (PM 1.674-1.288) $ 1,500,000 $ 2,172,447 2031-2035 CAL21154 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 (SB) transition lane from P Street to N Street In the City of Sacramento construct SR 51 (SB) transition lane from P Street to N Street (PM 0.808-0.523) $ 1,500,000 $ 2,172,447 2031-2035 CAL20906 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 51 (SB) Transition Lane from SB Watt Ave slip on ramp to Auburn Blvd slip on ramp
In the City of Sacramento construct SB transition lane from SB Watt Ave slip on ramp to Auburn Blvd slip on ramp (PM 7.886-7.521) $ 1,500,000 $ 2,119,461 2031-2035

Page 35 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20691 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Bridge Deck Replacement (G13 Contingency Project) In the City of Sacramento at the American River Bridge #24-0003, from north of B Street Underpass to north of Exposition Boulevard Overcrossing (PM

2.0/3.5) - Widen and replace bridge deck (G13 Contingency Project) [CTIPS ID 107-0000-1048]. Toll Credits for ENG". EA 3F070 $ 163,940,000 2026-2030 CAL21123
Project
Development Only SAC Caltrans D3
B- Road & Highway
Capacity SR 51 Bus/Carpool Lanes: Arden to I-80
Managed Lane Facility: Arden to I-80 in both directions (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes) $ 265,000,000 Post-2040 CAL20977 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Drainage Improvements
In Sacramento County, approximately 0.1 mile North of Marconi Ave, 24-31W, 24-117W, 24-123W. $ 1,816,000 $ 2,158,653 2026-2030
CAL20997 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 Fiber Optics
In Sac County on Route 51 from the 50/99/51 SEP to Jct 80. Replace existing comm. lines with fiber optics. SHOPP ID 17697 $ 4,356,000 $ 5,576,048 2026-2030 CAL20826 Planned Sac Caltrans D3
G- System
Management,
Operations, and ITS SR 51 ICM Implement ICM strategies on the SR 51 Corridor (Non-capacity) $ 45,000,000 $ 66,802,753 2036-2040 CAL21053 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Marconi Curve Barrier
In Sacramento County between Marconi Ave OC and Howe Ave (PM 5.6/5.9):

Install outer separation barrier in the NB direction and replace MBGR with outer separation in the SB direction. EA 3H730 $ 4,880,000 2020-2025 CAL21038 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Pavement Rehab
In Sacramento County on Route 51 from the County Line to approx. 0.4 mile north of Arden Way. SHOPP ID 20403 $ 10,247,000 $ 16,790,903 2036-2040 CAL20924 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Roadside Restoration A
In Sacramento County on Route 51 in Sacramento from the 50/99/51 Seperation to E Street $ 1,250,000 $ 2,048,271 2036-2040 CAL21223 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 51 Roadside Restoration B
In Sacramento County on Route 51 in Sacramento from arden Way to marconi Ave $ 1,250,000 $ 2,048,271 2036-2040
CAL20596 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51 Transition Lanes
SR 51 Transition Lanes: NB from Marconi Ave. to Fulton Ave.and SB from Fulton Ave. to Watt Ave. $ 84,700,000 $ 88,987,938 2020-2025 CAL20594 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 51/Arden Way Interchange
SR 51: Widen structure over Arden Way to 8 lanes plus 2 managed lanes, one in each direction, to accommodate the two managed lanes and a third NB general purpose lane from Exposition Boulevard to Arden Way. (project description may change based on results from the Managed Lanes Study.

Project is being evaluated for Express Toll Lanes, High Occupancy Toll Lanes, HOV lanes). Sac-51-3.2/6.6. Part of EA 0H931. $ 46,000,000 $ 48,328,750 2020-2025 CAL20600 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Auxiliary Lane A
SR 99 auxiliary lane: NB from WB Florin Rd. slip on ramp to EB 47th Ave. slip off ramp. Right-of-way aquisition required. Soundwall relocation required. $ 3,000,000 $ 4,453,517 2036-2040 CAL21084
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Auxiliary Lane B SR 99 auxiliary lane: SB from 47th Ave slip on ramp to Florin Rd slip off ramp $ 3,040,000 Post-2040 CAL21081 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (NB) auxiliary lane from the WB Mack Road slip on ramp to the EB Florin Road slip off ramp
In the City of Sacramento construct SR 99 (NB) auxiliary lane from the WB Mack Road slip on ramp to the EB Florin Road slip off ramp (PM 19.747-

20.628) $ 7,560,000 $ 10,682,082 2031-2035
CAL21177 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (NB) diagonal ramp meter at the SR 99/Elkhorn Blvd interchange
In the City of Elk Grove construct a diagonal ramp meter at the SR 99/Elkhorn Blvd westbound (WB) on ramp (PM 33.55) $ 380,000 $ 536,930 2031-2035 CAL21136 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (NB) loop ramp meter at the SR 99/Elkhorn Blvd
interchange
In the City of Elk Grove construction a loop ramp meter at the SR 99/Elkhorn Blvd eastbound (EB) on ramp (PM 33.32) $ 380,000 $ 536,930 2031-2035 CAL20883
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (SB) auxiliary lane from the Florin Rd slip on ramp to Mack Rd slip off ramp
In the City of Sacramento construct SR 99 (SB) auxiliary lane from the Florin Rd slip on ramp to Mack Rd slip off ramp (PM 19.479-17.939) $ 7,700,000 Post-2040

Page 36 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21243 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (SB) diagonal ramp meter at the SR 99/Elk Grove Blvd interchange
In the City of Elk Grove construct a connector ramp meter at the SR 99/Elk Grove Blvd interchange (SB) (PM 12.612) $ 1,940,000 $ 2,741,169 2031-2035 CAL21244 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (SB) diagonal ramp meter at the SR 99/Laguna Blvd interchange
In the City of Elk Grove construct a diagonal ramp meter on the EB onramp at the SR 99/Laguna Blvd interchange. Future configuration is a 1+1 (PM 13.661) $ 380,000 $ 536,930 2031-2035 CAL21245 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (SB) diagonal ramp meter at the SR 99/Sheldon Road interchange
In the City of Elk Grove construct a diagonal ramp meter at the SR 99/Sheldon Road interchange (PM 14.72) $ 380,000 $ 536,930 2031-2035 CAL21265 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 (SB) loop ramp meter at the SR 99/Laguna Blvd
interchange
In the City of Elk Grove construct a loop ramp meter on the WB onramp at the SR 99/Laguna Blvd interchange. (PM 13.891) $ 380,000 $ 536,930 2031-2035 CAL20601 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Auxiliary Lane
SR 99 Auxiliary Lane extension: SB, from Martin Luther King Blvd on ramp. to WB 47th Ave. slip off ramp. Right-of-way aquisition required. Soundwall relocation required. $ 3,000,000 $ 4,453,517 2036-2040
CAL20572
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Auxiliary Lanes
Construct auxiliary lanes on SR 99: NB from Cosumnes River Blvd/Calvine Road to Sheldon Road, SB from Laguna Blvd/Bond Road to Elk Grove Blvd, NB from Elk Grove Blvd to Laguna Blvd/Bond Road, NB from Laguna Blvd/Bond Road to Sheldon Road/Center Parkway, and NB from Sheldon Road/Center Parkway to Cosumnes River Blvd/Calvine Road. SHOPP ID 16936 $ 12,000,000 Post-2040 CAL20968 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Bridge Rail Upgrade
In Sacramento County on Route 99 from Stockton Blvd OC (Br#23-0134) to 12th Ave OC (Br# 24-0161). Bridge Rail Upgrade. SHOPP ID 16866 $ 17,500,000 $ 23,103,965 2026-2030 CAL20766 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Bridge Rehab at 21st Avenue UC
In the City of Sacramento, SR 99, at 21st Avenue Undercrossing #24-0154 (PM

21.9/23.6) - Replace bridge deck [CTIPS ID 107-0000-1107] (Toll Credits). Toll Credits for ENG, ROW, CON $ 5,843,000 2020-2025
CAL20876 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Detection
In Sac, Sut, & But Counties on Route 99 at various locations. Inductive Loop Replacement. $ 2,000,000 $ 2,436,806 2026-2030
CAL20871 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Drainage Improvements A
In Sacramento County from Amador Ave OC to just south of 12th Ave OC, PP 24-139W (Amador Ave OC), 24-144W (Rte 104/99 SEP), 24-146W (41st Ave OC), 24-231W (Oak Park SEP). Also on Sac 51 PM 0.0/8.9. Upgrade Pump Plants. SHOPP ID 20572 $ 13,720,000 $ 2,158,653 2026-2030 CAL20976 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Drainage Improvements B
In Sacramento County, approximately 0.1 mile North of McConnell UP (Br# 24- 48L), 24-48W. Pump Plant Upgrade. SHOPP ID 17063 $ 3,395,000 $ 643,317 2026-2030 CAL20762 Programmed SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Fiber Optics
Install fiber in and near the cities of Elk Grove and Sacramento, on SR 99, from Grant Line Road to SR 50 (PM 10.0/R24.3); also on SR 51 from SR 50 to 0.1 mile south of the Fort Sutter Viaduct (PM 0.0/0.1) - Install fiber optic cable [CTIPS ID 107-0000-1106] (Toll Credits). Toll Credits for ENG. 0H670 $ 12,150,000 2020-2025 CAL20827 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 ICM Implement ICM strategies on the SR 99 Corridor (Non-capacity) $ 45,000,000 $ 66,802,753 2036-2040 CAL20602 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Interchange Improvements Interchange Improvements: Mack Road, Florin Road, 47th Ave., 12th Ave. $ 40,000,000 $ 59,380,225 2036-2040 CAL20929
Project
Development Only SAC Caltrans D3
B- Road & Highway
Capacity SR 99 Managed lane extension
SR 99 Managed Lane facility extension - San Joaquin/Sac County Line to Kammerer/Grant Line Road (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes) $ 35,000,000 Post-2040 CAL20647 Planned SAC Caltrans D3
B- Road & Highway
Capacity SR 99 Managed Lanes
Managed Lane Facility and auxiliary lanes in both directions from Elk Grove Boulevard to Kammerer Road/Grant Line Road. $ 36,000,000 $ 53,442,202 2036-2040

Page 37 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20828
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Managed Lanes from Elk Grove Boulevard to J Street Underpass Convert existing HOV lanes to toll lanes or possibly install a reversible lane $ - Post-2040 CAL20859 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Pavement Rehabilitation B
In Sacramento County on Route 99 from MLK Blvd OC to approx 0.1 mile north of Jct 50/51. CAPM. SHOPP ID 20399 $ 38,010,000 $ 14,742,675 2026-2030 CAL20843 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Pavement Rehabilitation D
In Sacramento from Route 5 Interchange to Sutter County Line. SHOPP ID 18419 $ 9,550,000 $ 15,648,787 2036-2040
CAL20703 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 RHMA Overlay (G13 Contingency Project) In Galt, from the San Joaquin County Line to Simmerhorn Road (PM 0.2/1.6); also in the cities of Elk Grove and Sacramento, SR 99, from 0.7 mile south of Elk Grove Blvd to Martin Luther King Jr Blvd (PM 11.9/21.5) - Pavement rehabilitation [CTIPS ID 107-0000-1047] $ 45,012,000 2020-2025 CAL20470 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Seismic Retrofit and Bridge Rail Upgrade In and near Elk Grove, from 0.3 mile south of Dillard Road OC to south of Grant Line Road [replace Cosumnes River Bridge #24-0020R/L and Cosumnes River Overflow Bridge #24-0021R/L; upgrade bridge rails at Dillard Road OC #24- 0163; construct new McConnell OH #24-0048L) - Bridge seismic retrofit, bridge scour retrofit, bridge rail replacement and bridge replacement (PM 7.1/9.4) [CTIPS ID 107-0000-0904] $ 139,000,000 2020-2025
CAL20599 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Transition Lane
SR 99 Transition Lane: NB, from WB 47th Ave. slip on ramp to EB Fruitridge Rd. slip on ramp, and from WB Fruitridge Rd. loop off ramp to WB Fruitridge Rd. slip on ramp. Right-of-way aquisition required. Soundwall relocation required. $ 3,000,000 $ 4,344,894 2031-2035 CAL20508 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation SR 99/160 Scour Mitigation for Four (4) Bridges In Sacramento County, on SR 99, at South Lagoon Creek Bridge #24-0028L (PM

4.9), Lagoon Creek Bridge #24-0045L (PM 5.0) and North Lagoon Creek Bridge #24-0027L (PM 5.1); also on SR 160 (PM 44.5) at American River Bridge #24- 0001L - Scour mitigation [EFIS ID 0313000136; CTIPS ID 107-0000-0963] (Toll Credits). Toll Credits for ENG, ROW, CON $ 26,792,000 2020-2025 CAL21290
Project
Development Only SAC Caltrans D3
B- Road & Highway
Capacity SR-99 Improvements
SR-99 In Sacramento County from Laguna Blvd to Bond Rd. Add GP and HOV lanes at each location. Ramp Meter Improvements. $ 6,100,000 Post-2040 CAL20689 Programmed SAC Caltrans D3
B- Road & Highway
Capacity
State Route 51 (Capital City) Corridor Improvements: J St to Arden
On SR 51 between J Street to Arden Way: Extend bus/carpool lanes, widen the American River Bridge to 10 lanes (4 lanes NB and SB plus bus/carpool lane in both directions) and add new Class IV bike path adjacent to NB lanes, new SB auxiliary lane from Exposition Blvd to E St, NB transition lane from Elvas UP to SR 160 on-ramp, SB transition lane from Exposition Blvd slip off-ramp to loop on-ramp, replace B St UP, A St OC, and Elvas UP, and widen Tribute Rd UC. $ 483,000,000 2026-2030 CAL20884 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Sunrise Blvd to Hazel Ave (T) Aux Lanes US-50 In EB direction from Sunrise Blvd to Hazel Ave (T) install auxiliary lane $ 1,500,000 $ 1,697,112 2020-2025 CAL20598 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation
System Management/Traffic Operations System on SR 51
between U.S. 50 and I-80
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure. $ 3,000,000 $ 3,151,875 2020-2025 CAL20856 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation TMC Rehab
In Sacramento County at the Regional Transportation Management Center (RTMC): Install new roof and energy efficient HVAC system. EA 4H970 $ 6,380,000 2020-2025 CAL20967 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation TransLab Upgrades In Sacramento at the TransLab on 59th Street $ 13,000,000 $ 21,302,014 2036-2040 CAL20574 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS Traveler Information System
110 locations throughout Sacramento County. Travel time detection and notification systems. $ 1,939,200 $ 2,878,753 2036-2040 CAL20606
Project
Development Only SAC Caltrans D3
B- Road & Highway
Capacity U.S. 50 / SR 99 / SR 51 Oak Park Interchange Reconstruction Managed Lane Facility freeway to freeway connectors. $ 10,000,000 Post-2040

Page 38 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24220 Programmed SAC Caltrans D3
B- Road & Highway
Capacity US 50 / Rancho Cordova Parkway Interchange
About 7 miles east of Sacramento between Sunrise Boulevard overcrossing and Hazel/Nimbus overcrossing-Construct new interchange. $ 99,162,000 2026-2030 CAL20705 Programmed SAC Caltrans D3
G- System
Management,
Operations, and ITS US 50 65th St. to Howe Ave. Auxiliary Lane In the City of Sacramento, US 50, from 65th Street to east of Howe Avenue (PM R2.6/R3.8) - Construct westbound auxiliary lane [project proposes to add/extend US 50 auxiliary lane, which currently begins with the Howe Ave slip entrance, and will be extended to the east to receive traffic from the Howe Ave loop entrance ramp] (Toll Credits). Toll Credits for ENG, ROW, CON $ 3,930,000 2020-2025 CAL20379 Programmed SAC Caltrans D3
G- System
Management,
Operations, and ITS US 50 Auxiliary Lanes, Bradshaw to Mather Near Sacramento, from Bradshaw Road OC to Mather Field OC - Add auxiliary lanes EB & WB (PM R7.8/R9.5) [EFIS ID 0300001101] $ 9,498,000 2020-2025 CAL18838 Programmed SAC Caltrans D3
B- Road & Highway
Capacity US 50 HOV Lanes (I-5 to Watt Ave.)
US 50 HOV Lanes - Construct High Occupancy Vehicle (HOV) Managed Lanes - Managed lanes on US 50 [project covers PE: from I-5 to 0.8 mile east of Watt Avenue (PM L0.2/R6.1) and CON: from 0.3 mile west of SR 99 to 0.8 mile east of Watt Avenue (PM L2.2/R6.1)] (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes). 0H08U $ 118,400,000 2020-2025 CAL20829
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS US 50 Managed Lanes from Watt Avenue to Cameron Drive Convert existing HOV lanes between Watt Avenue and Cameron Park Drive to a Toll Lane or possibly install a reversible lane $ - Post-2040 CAL20860 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation US 50 Pavement Rehabilitation
In Sacramento County on Route 50 from Sunrise Blvd to approx 0.7 mile west of Prairie City Rd OC. $ 24,720,000 $ 30,118,920 2026-2030 CAL20761 Programmed SAC Caltrans D3
C- Maintenance &
Rehabilitation US 50 Pavement Rehabilitation/Bridge Improvements In Sacramento from South Park Viaduct (Br#24-243) to Watt Ave OC (Br#24-34) $ 278,300,000 2020-2025 CAL21033 Planned SAC Caltrans D3
C- Maintenance &
Rehabilitation US 50 Pump Plant
In Sacramento County approx. 0.1 miles West of Mather Field OC (Br#24- 0175). Upgrade Pump Plant. SHOPP ID 19270 $ 2,975,000 $ 659,400 2026-2030 CAL20648
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS US 50 Transition and Auxiliary Lane In Sacramento County on US 50, construct an eastbound transition lane from the Folsom Blvd slip off ramp to the Prairie City Rd slip off ramp, and construct an auxiliary lane from the Prairie City Rd slip on ramp to the Folsom Blvd slip off ramp $ 5,000,000 Post-2040
CAL20641 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS US 50 Transition Lane
US 50 Westbound Transition Lane from Stockton Blvd off-ramp to Rt-51 connector on-ramp. Realign and add acceleration taper to Stockton loop off ramp $ 15,000,000 $ 21,724,472 2031-2035
CAL20912
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS
US-50 In WB direction from SR-51 off ramp to SR-99 off ramp install auxiliary lane
US-50 In WB direction from SR-51 off ramp to SR-99 off ramp install auxiliary lane $ 1,500,000 Post-2040
CAL20931 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
US-50 (EB) In Sacramento County on diagonal ramp at NB
Prairie City Rd. Install ramp meter
US-50 (EB) In Sacramento County on diagonal ramp at NB Prairie City Rd. Install ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL20930 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
US-50 (WB) In Sacramento County on loop ramp at NB Prairie City Rd. Install ramp meter
US-50 (WB) In Sacramento County on loop ramp at NB Prairie City Rd. Install ramp meter $ 900,000 $ 1,474,755 2036-2040
CAL21288 Planned SAC Caltrans D3
G- System
Management,
Operations, and ITS
Various locations in Sac, ED, Yol, Pla and Nev counties on Routes 5,50,51,65,80,89,and 99. Install new CCTV and CMS systems.

Various locations in Sac, ED, Yol, Pla and Nev counties on Routes 5,50,51,65,80,89,and 99. Install new CCTV and CMS systems. SHOPP ID 17693 $ 8,184,000 $ 10,476,212 2026-2030 CAL20852
Project
Development Only SAC Caltrans D3
G- System
Management,
Operations, and ITS WB El Camino to NB 51. Change config to 1+1, add aux. WB El Camino to NB 51. Change config to 1+1, add accel. SR-51 $ 3,102,000 Post-2040 SAC25049 Programmed SAC
Capital Southeast
Connector JPA
D- Programs &
Planning Capital SouthEast Connector - C - PE Only
In Elk Grove: Grant Line Rd from Bond Rd to Calvine Rd; Widen from 2 to 4 lanes. PE Only (Total Project Cost is $32,600,000) $ 2,000,000 2036-2040

Page 39 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
VAR56128 Programmed SAC
Capital Southeast
Connector JPA
D- Programs &
Planning Capital Southeast Connector - D2 - PE Only
In Rancho Cordova: Grant Line Road from Jackson Rd to White Rock Rd: Widen from 2 lanes to a 4-lane expressway. Work does not include construction within the MTP/SCS horizon year. Prepare the project approval and environmental document (PA/ED) and secure right of way (ROW) for Segment D2 of the Capital Southeast Connector. Work includes a Class I multi-modal trail. $ 6,259,121 2026-2030
SAC24250 Programmed SAC
Capital Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector - D3a (CON)
In Folsom: Between Prairie City Rd and Carson Crossing Rd; Construct 4 lanes (Expressway). (To be constructed with Capital SouthEast Connector - E1, ELD19468). $ 27,265,000 2020-2025
SAC24920 Planned SAC
City of Citrus
Heights A- Bike & Ped Antelope Road Complete Streets - Phase 2 Design, construction; ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 15,000,000 $ 22,267,584 2036-2040 SAC24921 Planned SAC
City of Citrus
Heights A- Bike & Ped Antelope Road Complete Streets - Phase 3 Design, ROW, construction; ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 10,500,000 $ 12,481,200 2026-2030 SAC24923 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Auburn Blvd Complete Streets - Phase 3
Design, ROW acquisition and construction; utility undergrounding, ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 32,000,000 $ 52,435,726 2036-2040 SAC24924 Planned SAC
City of Citrus
Heights A- Bike & Ped Auburn Blvd Complete Streets - Phase 4 Design and construction; ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 20,000,000 $ 23,773,715 2026-2030 SAC24925 Planned SAC
City of Citrus
Heights A- Bike & Ped Auburn Blvd Complete Streets - Phase 5 Design, ROW, and construction; utility undergrounding, ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 28,000,000 $ 41,566,157 2036-2040 SAC25089 Planned SAC
City of Citrus
Heights A- Bike & Ped Citrus Heights ITS Phase I
Installation of new conduit and fiber for City owned/maintained traffic signal communications innterconnect. $ 2,405,495 $ 2,465,632 2020-2025 SAC25090 Planned SAC
City of Citrus
Heights
G- System
Management,
Operations, and ITS Citrus Heights ITS Phase II
Installation of new conduit and fiber for City owned/maintained traffic signal communications innterconnect. $ 1,434,025 $ 1,506,623 2020-2025 SAC25091 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Citrus Heights ITS Phase III
Installation of new conduit and fiber for City owned/maintained traffic signal communications innterconnect. $ 2,156,500 $ 2,322,315 2020-2025 SAC25064 Programmed SAC
City of Citrus
Heights A- Bike & Ped Electric Greenway (Class I Multi-Use Trail) In Citrus Heights: Between Arcade Creek Park Preserve and Wachtel Way; Construct a 2.9 mile long Class I Multi-Use Trail. $ 7,015,000 2020-2025 SAC24929 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Fair Oaks Blvd Complete Streets Phase 1
Design and construction; ADA, Pedestrian and Bicycle improvements, LED street light conversion, road resurfacing. $ 2,700,000 $ 4,008,165 2036-2040 SAC24930 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Fair Oaks Blvd Complete Streets Phase 2
Design and construction; ADA and Pedestrian improvements including sidewalk infill, Bicycle improvements, LED street light conversion, road resurfacing. $ 3,200,000 $ 4,750,418 2036-2040
SAC24919 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Greenback Lane Complete Streets
construction; ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal modifications, full road reconstruction, LED street light conversion. $ 4,200,000 $ 4,412,625 2020-2025 SAC25065 Programmed SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Mariposa Safe Routes to School (Phase IV) In Citrus Heights: Mariposa Ave. between Northeast Circle and Madison Ave:

Construct Class II bike lanes, infill sidewalk, street lights, pedestrian safety improvements, and signal improvements. $ 2,603,000 2020-2025 SAC24932 Planned SAC
City of Citrus
Heights A- Bike & Ped Oak Avenue Complete Streets Phase 1 Design and construction; ADA and Pedestrian improvements including sidewalk infill, Bicycle improvements, installation of new LED street lights, road resurfacing. $ 3,800,000 $ 5,641,121 2036-2040
SAC24933 Planned SAC
City of Citrus
Heights A- Bike & Ped Oak Avenue Complete Streets Phase 2 Design and construction; ADA and Pedestrian improvements including sidewalk infill, Bicycle improvements, installation of new LED street lights, road resurfacing. $ 3,500,000 $ 4,058,927 2026-2030
SAC24927 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Old Auburn Road Complete Streets Phase 1 Design, ROW and construction; ADA, Pedestrian and Bicycle improvements (major sw infill for accessibility), traffic signal upgrades, installation of new LED street lights, full road reconstruction. $ 15,000,000 $ 24,579,247 2036-2040

Page 40 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24928 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation Old Auburn Road Complete Streets Phase 2 Design and construction; ADA, Pedestrian and Bicycle improvements (major sw infill for accessibility), traffic signal upgrades, installation of new LED street lights, full road reconstruction. $ 12,000,000 $ 13,916,321 2026-2030 SAC24926 Planned SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation San Juan Ave Complete Streets
Design, ROW and construction; utility undergrounding, ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 22,000,000 $ 32,659,124 2036-2040 SAC25261 Programmed SAC
City of Citrus
Heights
C- Maintenance &
Rehabilitation San Juan Ave. Complete Streets Rehabilitation - Phase 1 On San Juan Ave., from Madison Ave. to Spicer Dr.: Design and complete rightof-way to rehabilitate pavement; repair curb, gutter, and sidewalk; infill pedestrian paths; add buffered class II bike lanes, ADA and transit stop improvements, and streetlights at sidestreet intersections and other key points. On San Juan Ave. from Madison Ave. to Chesline Dr.: Construct road rehabilitation, repair curb, gutter, and sidewalk, infill pedestrian paths; add buffered class II bike lanes, ADA and transit stop improvements, and streetlights at sidestreet intersections and other key points. $ 3,283,000 2020-2025 SAC24934 Planned SAC
City of Citrus
Heights A- Bike & Ped Saybrook/Misty Creek I-80 Pedestrian/bicycle overpass Design and construction; ADA compliant Pedestrian and Bicycle bridge/overpass connecting west side at Saybrook with east side at Misty Creek. $ 15,000,000 $ 22,267,584 2036-2040
SAC24917 Planned SAC
City of Citrus
Heights A- Bike & Ped Sunrise Blvd Complete Streets - Phase 2 construction; ADA, Pedestrian, Bicycle and Transit Improvements, traffic signal upgrades, LED street light conversion, full road reconstruction, hardscape and landscape. $ 6,000,000 $ 6,461,344 2020-2025
SAC24918 Planned SAC
City of Citrus
Heights A- Bike & Ped Sunrise Blvd Complete Streets - Phase 3 construction; ADA, Pedestrian, Bicycle and Transit Improvements on east side of road including installation of new sw/c&g, LED street light conversion, full road reconstruction, hardscape and landscape. $ 5,002,000 $ 5,800,786 2026-2030 SAC25131 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS Big Horn Blvd. & Bilby Rd. Intersection Install a trafic signal at the Big Horn Blvd. & Bilby Rd. Intersection $ 500,000 $ 551,906 2020-2025 SAC25098 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS Big Horn Blvd. & Poppy Ridge Rd. Intersection Install a trafic signal at the Big Horn Blvd. & Poppy Ridge Rd. Intersection $ 500,000 $ 551,906 2020-2025 SAC24773 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Big Horn Blvd. Extension - Bilby to Kammerer
In Elk Grove, Big Horn Blvd. from Bilby Rd. to Kammerer Rd, Construct (4- lanes) extension $ 8,181,000 2020-2025
SAC25102
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Big Horn Blvd. Extension to Eschinger Big Horn Blvd. from Kammerer Rd. to Eschinger Rd., Construct 2 lane road. $ 20,800,000 Post-2040 SAC24982 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Big Horn Blvd. Extension to Kammerer
In Elk Grove, Big Horn Blvd. from Bilby Rd. to Kammerer Rd.: Construct new 2- lane roadway $ 5,669,500 $ 6,258,067 2020-2025
SAC25138 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Big Horn Blvd. Widening
In Elk Grove, Big Horn Blvd. from Bilby Rd. to Kammerer Rd.: Widen to 4-lane roadway $ 4,600,000 $ 7,537,636 2036-2040
SAC25103 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bilby Rd. extension past Big Horn
In Elk Grove, Bilby Road Extension from Bruceville Road to 2,000 feet past McMillan Road/Big Horn Extension, Widen to 4-lane roadway $ 16,000,000 $ 17,661,006 2020-2025 SAC24972 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bilby Rd. extension to Lotz Pkwy
Construct New Road: 4 lanes from McMillan Rd./Future Big Horn Blvd. extension to Lotz Pkwy. $ 3,495,600 $ 3,858,488 2020-2025 SAC24073 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening B Widen: 4 lanes from Sheldon Rd. to Calvine Rd. $ 6,200,200 $ 8,760,720 2031-2035 SAC24103
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening C In Elk Grove, from Grant Line Road to Bond Road, widen from 2 to 4 lanes. $ 1,043,550 Post-2040 SAC24102
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening D In Elk Grove, between Bond Road and Sheldon Road: Widen from 2 to 4 lanes. $ 696,120 Post-2040 SAC24076
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening E Widen: 4 to 6 lanes from Grant Line Rd. to Bond Rd. $ 6,200,000 Post-2040

Page 41 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24074
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening F Widen: 4 to 6 lanes from Sheldon Rd. to Calvine Rd. $ 3,800,000 Post-2040 SAC24075
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bradshaw Rd. Widening G Widen: 4 to 6 lanes from Bond Rd. to Sheldon Rd. $ 3,700,000 Post-2040 SAC24792 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Bruceville Rd. and Poppy Ridge/Quail Run Intersection Install a trafic signal at the Bruceville Rd. and Poppy Ridge/Quail Run intersection. $ 338,100 $ 338,100 2020-2025
SAC25139 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening A Widen: 6 lanes from Sheldon Rd. to Big Horn Blvd. $ 5,400,000 $ 5,960,590 2020-2025 SAC19010 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening B In Elk Grove, from Whitelock Parkway to Bilby Road: Widen from 2 to 4 lanes. $ 3,719,000 $ 5,254,850 2031-2035 SAC24105 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening C
In Elk Grove, Bruceville Road from Bilby Road to Kammerer Road: Widen from 2 to 4 lanes. $ 2,200,000 $ 3,604,956 2036-2040
SAC24949
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening D Widen from 4 to 6 lanes from Elk Grove Blvd. to Whitelock Parkway $ 1,683,600 Post-2040 SAC24082
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening E Widen: 6 lanes from Bilby Rd. to Kammerer Rd. $ 1,834,200 Post-2040 SAC24081
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Bruceville Rd. Widening F Widen: 6 lanes from Whitelock Pkwy. to Bilby Rd. $ 1,845,900 Post-2040 SAC24084
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Calvine Road Widening A Widen Calvine Road from Vineyard Road to Grant Line Road from 2 to 4 lanes $ 14,000,000 Post-2040 SAC25140
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Calvine Road Widening B
Widen Calvine Road from Elk Grove Florin Rd to Waterman Rd. from 4 to 6 lanes $ 4,000,000 Post-2040
SAC25104 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Calvine Road Widening C Widen Calvine Road from Cliffcrest Dr. to Elk Grove Florin Rd. from 4 to 6 lanes $ 7,000,000 $ 8,528,820 2026-2030 SAC24700 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Capital SouthEast Connector - B2 - CON
In Elk Grove, Grant Line Road; from Mosher Road to Bradshaw: Widen from 2 to 4 lanes. $ 8,349,000 2020-2025
SAC25048 Programmed SAC City of Elk Grove
D- Programs &
Planning Capital SouthEast Connector - B3 - PE Only
In Elk Grove: Grant Line Rd from Bradshaw Rd to Bond Rd; Widen from 2 to 4 lanes (thoroughfare). PE Only. (Total Project Cost is $23,100,000.) $ 2,000,000 2036-2040 SAC25105 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation East Stockton Blvd & Valley Oak Ln. Intersection Improvements Install a trafic signal at East Stockton Blvd & Valley Oak Ln. $ 500,000 $ 551,906 2020-2025 SAC25093 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove Blvd & Grant Line Road Install a traffic signal at Elk Grove Blvd & Grant Line Road. $ 500,000 $ 551,906 2020-2025 SAC24951 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Elk Grove Blvd Center Turn Lane and Shoulders
Widen to provide a two way left turn lane and adequate shoulder/bike lanes. from Bradshaw Rd. to Grant Line Rd. $ 2,661,500 $ 2,661,500 2020-2025 SAC25092 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove Blvd Operational Improvements
Traffic Signal communication upgrade (new fiber) Elk Grove Boulevard from Elk Grove Florin to Franklin $ 1,100,000 $ 1,214,194 2020-2025 SAC24966 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS Elk Grove Blvd Right Turn Pockets Right Turn pocket from EB Elk Grove Blvd to SB SR99 $ 875,000 $ 965,836 2020-2025 SAC25132 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove Blvd. and Bradshaw Rd. Install a traffic signal or roundabout at Elk Grove Blvd. and Bradshaw Rd. $ 4,000,000 $ 4,415,252 2020-2025 SAC25094 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove Florin Rd. and La Haya Way Signal Install Signal at Elk Grove Florin Rd. and La Haya Way $ 500,000 $ 551,906 2020-2025

Page 42 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25074 Programmed SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove Florin Road Sidewalk Infill SRTS In Elk Grove: On Elk Grove Florin Road, between Valley Oak Lane and East Stockton Blvd, eliminate sidewalk gaps and improve ADA access, bus stop access, bicycle and pedestrian crossings, and overall safety in the corridor.

Provide walking and biking education for three school communities: Florence Markofer Elementary, Joseph Kerr Middle School, and Elk Grove High School. $ 1,101,000 2020-2025 SAC25095 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Elk Grove-Florin Road ITS Improvements
Traffic signal communications upgrade and coordination along Elk Grove Florin from Bond Road to Valley Oak Lane, hook up to existing fiber optic and upgrade controllers $ 280,000 $ 309,068 2020-2025
SAC24086
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Elk Grove-Florin Road Widening A Widen Elk Grove-Florin Road from 4 to 6 lanes from Calvine Road to Sheldon $ 9,540,000 Post-2040 SAC24952 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Excelsior Rd Full 2 lane Improvement from Sheldon Rd. to Calvine Rd. $ 5,000,000 $ 8,193,082 2036-2040 SAC25157 Programmed SAC City of Elk Grove
C- Maintenance &
Rehabilitation Gaurdrail Upgrade
At four locations, Bruceville Road at Laguna Creek Bridge, Sheldon Road at Laguna Creek Bridge, Waterman Road at Laguna Creek Bridge, and Grant Line Road at Deer Creek Tributary Bridge: Upgrade outdated guardrail. (H9-03-006) $ 329,200 2020-2025 SAC20510 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Grant Line Road Grant Line Road from Bond Road to Calvine Road: alignment study. $ 800,000 $ 800,000 2020-2025 SAC24795 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation
Grant Line Road Sheldon Area Operational Improvements
Phase 1
Widen Grant Line Road, between Bond Road and Calvine Road, to accommodate Signals/Roundabouts and left and right turn lanes at intersections. $ 5,200,000 $ 5,330,000 2020-2025
SAC24119 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity
Grant Line Road Widening Phase 2 and Capital SouthEast
Connector B2
In Elk Grove, Grant Line Road, from Waterman Road to Bradshaw Road (SouthEast Connector Segment B2): Widen from 2 to 4 lanes. (Specifically, from Waterman Road to Mosher Road, widen symmetrically, adding a new line to both sides. And from Mosher Road to Bradshaw Road, add 2 lanes on the north side and reuse the existing 2 lanes.) At Grant Line Road/Bradshaw Road and Grant Line Rd / Mosher Rd Intersection: Realign and signalize intersection. (PE and ROW for intersection work programmed on SAC24700. See also SAC25081.) $ 19,963,000 2020-2025
SAC24962 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Hi Bus from CRC to Elk Grove
This project is to develop an enhanced bus corridor 8.5 miles along Bruceville Rd to Big Horn to Kammerer to 99 between Cosumnes River College and Elk Grove. $ 37,813,160 $ 42,782,120 2020-2025
SAC24788
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Hi Bus from I-5 to Bradshaw Rd
Develop an East-West enhanced bus corridor in Elk Grove along Elk Grove Blvd. from I-5 to Bradshaw Road. $ 1,000,000 Post-2040
SAC25170 Programmed SAC City of Elk Grove
G- System
Management,
Operations, and ITS ITS 5A - Signal and Intersection Modifications In Elk Grove, from Franklin Blvd to Big Horn Blvd. and at the intersections of Elk Grove Blvd. and Florin Road, Bond Road and Florin Road: Install new city fiber and copper signal interconnect. Connect existing city fiber and copper signal interconnect. $ 906,000 2020-2025
SAC24094 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Kammerer Rd Extension (Connector Segment A)
In Elk Grove, Kammerer Rd. from existing Kammerer Road, from Bruceville Rd. to Big Horn Boulevard: Reconstruct road at 2 lanes with shoulders, and Kammerer Rd., from Bruceville Rd. to Interstate 5/Hood Franklin Interchange:

Extend road. Modify the I-5/Hood Franklin interchange (signalization and turn lanes at the ramps), construct a grade separation at the UPRR tracks, Class 2 bike lanes, and signalized intersections at major road crossings. $ 50,737,000 2026-2030 SAC25097 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Kammerer Rd Extension (Connector Segment)
Extend Kammerer Road, between Bruceville Rd. and Hood Franklin with seperated median, 2 lanes, and Class 3 bike lanes. Would inlcude a railroad grade seperation and connections to a two lane Willard. Could include minor midifications to Hood Franklin & I-5 interchange. $ 50,000,000 $ 55,190,645 2020-2025

Page 43 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25135 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Kammerer Rd Reconstruction (Connector Segment) Reconstruct Kammerer Road, between Lent Ranch Pkwy. and Bruceville Road, with seperated median, 2 lanes, and Class 2 bike lanes. $ 24,000,000 $ 26,491,509 2020-2025 SAC24114 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Kammerer Road Widening (Connector Segment)
In Elk Grove, from approximately 6000' west of SR 99 to Bruceville Road:

Widen from 2 to 4 lanes. This Project is included in the Environmental Studies (NEPA and CEQA) for SAC24094, Kammerer Road Extension. $ 20,400,000 2026-2030 SAC25136 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Laguna Boulevard/Bond Road Operational Improvements Traffic Signal communication upgrade (new fiber) Laguna from Big Horn to Franklin. In Addition, Traffic signal communication upgrade along Bond/Laguna/Bighorn from Bond at Waterman to Big Horn at Civic Center Drive $ 1,100,000 $ 1,214,194 2020-2025
SAC25019 Programmed SAC City of Elk Grove A- Bike & Ped Laguna Creek Trail and Bruceville Rd Sidewalks In Elk Grove, Laguna Creek Trail, from Lewis Stein Rd. to Bruceville Rd undercrossing. Laguna Creek Trail, from south of Center Pkwy to Big Horn Blvd.; Laguna Creek Trail at Center Parkway; Sidewalk on west side of Bruceville, from Big Horn Boulevard to south of Center Parkway and on a section north of Laguna Blvd. (Emission Benefits in kg/day: ROG 0.08, NOx $ 2,309,000 2020-2025 SAC24111 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Lotz Parkway
In Elk Grove, Lotz Parkway from Whitelock Parkway to Poppy Ridge Road:

Construct new 4-lane roadway; and Lotz Parkway from Poppy Ridge Road to

0.5 miles south of Whitelock Pkwy at the northern boundary of the Sterling Meadows development area: Construct new 2-lane roadway. $ 8,662,500 2020-2025 SAC25099
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Lotz Parkway Extension Lotz Parkway from Kammerer road to Eschinger Rd: extend 2 lane road $ 20,800,000 Post-2040 SAC24980 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Lotz Parkway Widening A
In Elk Grove, from Laguna Springs Drive to Whitelock Parkway: widen to 4- lanes. $ 3,500,000 $ 3,863,345 2020-2025
SAC24987 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Lotz Parkway Widening B
In Elk Grove, Lotz Pkwy. from Whitelock Pkwy to Kammerer Rd: widen to 4- lanes $ 10,000,000 $ 12,800,845 2026-2030
SAC24169 Programmed SAC City of Elk Grove A- Bike & Ped Old Town Elk Grove Streetscape Phase 2 In Elk Grove, Elk Grove Boulevard, from School St. to Waterman Rd.: Street frontage improvements, including: expanded decorative sidewalks & landscape strips, corner bulb-outs,landscaped median islands at intersections/pedestrian crossings, crosswalks, bike lanes/routes, signs and striping, bus shelters, related frontage improvement features and potential utility undergrounding.

Project may include bike and bus improvements at the City proposed Railroad Avenue Plaza. The Plaza improvements would be along Elk Grove Boulevard near Railroad Avenue, just east of the UPRR Railroad Tracks in Old Town Elk Grove. (Emission Benefits in kg/day: .0.04 ROG, 0.03 NOx, 0.01 PM10, 0.01 PM2.5). $ 5,957,000 2020-2025
SAC25096
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Reconstruct Hood Franklin/ I-5 interchange Reconstruct Interchange at Hood Franklin/ I-5 interchange $ 7,000,000 Post-2040 SAC25189 Programmed SAC City of Elk Grove A- Bike & Ped Sheldon Road Bike Lanes and Turn Lanes Sheldon Road between Elk Grove Florin Road and Waterman Road, add bike lanes and turn lanes.. Toll Credits for ENG, ROW $ 1,160,000 2020-2025 SAC19160 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Sheldon Road Widening A
Widen Sheldon Road from Elk Grove-Florin Road to Waterman Road: widen from 2 to 4 lanes. $ 7,651,500 $ 8,445,824 2020-2025
SAC25100 Planned SAC City of Elk Grove
C- Maintenance &
Rehabilitation Sheldon/Bader Rd. Intersection Improvements Install a trafic signal or roundabout at Sheldon Rd. and Bader Rd. $ 4,000,000 $ 4,415,252 2020-2025 SAC24968 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS State Route 99 Southbound Auxiliary Lane from Elk Grove Blvd. to Laguna Blvd. $ 6,400,000 $ 8,192,541 2026-2030 SAC25137 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS State Route 99 Auxillary Lanes A Northbound Auxilary Lane on SR99 from Northbound On Ramp to SR99 $ 4,900,000 $ 5,408,683 2020-2025

Page 44 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25101 Planned SAC City of Elk Grove
G- System
Management,
Operations, and ITS State Route 99 Auxillary Lanes C Northbound Auxilary Lane on SR99 from Northbound On Ramp to SR99 $ 6,500,000 $ 10,651,007 2036-2040 SAC25158 Programmed SAC City of Elk Grove A- Bike & Ped Trail Crossing Safety At four (4) existing trail crossings of public roads, Laguna Park Drive, Adobe Springs Way, Bertwin Way, and Stonebroook Drive: Install crosswalks, advance yield signs, Rapid Rectangular Flashing Beacons (RRFBs) and, associated advanced warning signs. (H9-03-007) $ 411,600 2020-2025 SAC24097 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Waterman Rd. Widen: 4 lanes from Elk Grove Blvd. to Bond Rd. $ 4,800,000 $ 5,298,302 2020-2025 SAC24112 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Waterman Road Widening A In Elk Grove, from Elk Grove Blvd to Grant Line Road: Widen from 2 to 4 lanes. $ 7,500,000 $ 8,915,143 2026-2030 SAC24096 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Waterman Road Widening C Widen Waterman Road from Sheldon Road to Bond Road from 2 to 4 lanes. $ 357,540 $ 585,871 2036-2040 SAC24960 Planned SAC City of Elk Grove
B- Road & Highway
Capacity West Stockton Blvd
On West Stockton north of Promenade to Whitelock Pkwy, construct full 2 lane improvements and realign road to intersect with Lotz Pkwy south of Whitelock.

Rename to Promenade. $ 1,583,039 $ 2,236,793 2031-2035
SAC20320 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Whitelock Parkway Widening
In Elk Grove, from Big Horn Blvd to West Stockton Blvd: Widen to 4 lane roadway and add signals. $ 520,280 $ 546,619 2020-2025
SAC24098 Programmed SAC City of Elk Grove
B- Road & Highway
Capacity Whitelock Parkway/SR99 Interchange Project
In Elk Grove, Whitelock Parkway and SR 99, Construct new Interchange with new pedestrian bridge over SR99 to Elk Grove Regional Park and High School. (Total Project cost = $72,200,000) $ 17,500,000 2026-2030 SAC24954 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Willard Parkway D Widen from 4 to 6 lanes from Whitelock Pkwy. to South Bilby Rd. $ 1,854,100 $ 3,038,159 2036-2040 SAC20340
Project
Development Only SAC City of Elk Grove
B- Road & Highway
Capacity Willard Parkway Extension
In Elk Grove, Willard Parkway from Bilby Road to Kammerer Road, Widen to four lane roadway. $ 15,000,000 Post-2040
SAC24961 Planned SAC City of Elk Grove
B- Road & Highway
Capacity Wilton Rd Full 2 lane improvements from Grant Line Rd. to City Limit $ 7,789,900 $ 8,598,592 2020-2025 SAC24331 Planned SAC City of Folsom
B- Road & Highway
Capacity Alder Creek Parkway
Construct New Road: 4 lanes from Prairie City Rd. to Empire Ranch Rd.

Extension south of U.S. 50. $ 45,000,000 $ 66,802,753 2036-2040 SAC22060 Planned SAC City of Folsom
B- Road & Highway
Capacity East Natoma Street Widening
In Folsom, East Natoma St from Fargo Way to Folsom Lake Crossing: widen from 2 to 4 lanes and construct bicycle trail undercrossing. $ 3,150,000 $ 3,477,011 2020-2025 SAC24327 Planned SAC City of Folsom
B- Road & Highway
Capacity Empire Ranch Rd. Road Extension: 4 lanes from U.S. 50 to White Rock Rd. $ 18,000,000 $ 26,721,101 2036-2040 SAC24400 Planned SAC City of Folsom
C- Maintenance &
Rehabilitation Folsom Blvd. Bike/Ped Grade Separation
In Folsom, at Folsom Blvd. and Humbug-Willow Creek Parkway, construct a bicycle and pedestrian grade-separated crossing of Folsom Blvd. Includes connections to existing trails on both sides of Folsom Blvd. $ 2,500,000 $ 2,562,500 2020-2025 SAC24324 Planned SAC City of Folsom
C- Maintenance &
Rehabilitation Folsom Lake Trail
In Folsom, along the Folsom Lake Trail corridor from the Folsom Lake Crossing Bike/Pedestrian overcrossing to Green Valley Road, construct approx 2-miles of class 1 bike trail. $ 2,500,000 $ 2,828,521 2020-2025 SAC22930 Planned SAC City of Folsom
B- Road & Highway
Capacity Folsom-Auburn Rd.

Add Turn Lanes: Folsom-Auburn Rd. / Oak Ave. Includes: left and right turn lanes and intersection signal modifications. $ 2,000,000 $ 2,207,626 2020-2025 SAC21280 Programmed SAC City of Folsom
B- Road & Highway
Capacity Green Valley Road Widening
On Green Valley Road, from East Natoma Street to Sophia Parkway: widen from 2 lanes to 4 lanes and provide Class II bicycle paths. (Toll Credits for PE and CON.) . Toll Credits for ENG, CON $ 6,183,934 2020-2025 SAC24506 Planned SAC City of Folsom
C- Maintenance &
Rehabilitation Greenback Lane Bridge Rehabilitation
Greenback Lane, over the American River, 0.2 miles east of Folsom-Auburn Rd.: Structural rehabilitation of the 2 lane bridge. $ 8,644,000 $ 10,275,000 2026-2030 SAC21210 Planned SAC City of Folsom
B- Road & Highway
Capacity Iron Point Rd.

Widen: 6 lanes from Black Diamond Dr. to Prairie City and Outcropping to Broadstone Pkwy. $ 5,000,000 $ 8,193,082 2036-2040
SAC21270 Programmed SAC City of Folsom
B- Road & Highway
Capacity Sibley Street
In Folsom, Sibley Street from Glenn Drive to Blue Ravine Road: widen from 2 to 4 lanes. $ 1,800,000 2020-2025
SAC19890 Programmed SAC City of Folsom
B- Road & Highway
Capacity US 50 at Empire Ranch Road
US 50 at Empire Ranch Road: Construct 4 lane interchange with US 50 at Empire Ranch Road (formerly Russell Ranch Road). HPP #337 (Toll Credits for PE). Toll Credits for ENG $ 58,885,000 2031-2035

Page 45 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24463 Planned SAC City of Folsom
B- Road & Highway
Capacity US 50 at Scott Road
Ramp modifications and overpass widening for US 50/East Bidwell/Scott Road Interchange to improve access to development south of US 50. $ 3,180,000 $ 3,780,021 2026-2030 SAC24888 Planned SAC City of Folsom
G- System
Management,
Operations, and ITS US 50 Auxilary Lane Prairie City to Oak Avenue EB Auxiliary lane from Prairie City Road to Oak Avenue $ 3,000,000 $ 4,453,517 2036-2040 SAC24891 Planned SAC City of Folsom
G- System
Management,
Operations, and ITS US 50 Auxiliary Lane Empire Ranch to Latrobe Road EB Auxiliary lane from Empire Ranch to Latrobe Road $ 3,000,000 $ 3,394,225 2020-2025 SAC24889 Planned SAC City of Folsom
G- System
Management,
Operations, and ITS US 50 Auxiliary Lane Oak Avenue to Scott Road EB Auxiliary lane from Oak Avenue to Scott Road $ 3,000,000 $ 3,311,439 2020-2025 SAC24890 Planned SAC City of Folsom
G- System
Management,
Operations, and ITS US 50 Auxiliary Lane Scott Road to Empire Ranch EB Auxiliary lane from Scott Road to Empire Ranch $ 3,000,000 $ 3,566,057 2026-2030 SAC24970 Planned SAC City of Folsom
B- Road & Highway
Capacity US50 Rowberry Overcrossing
Construct New Overcrossing: 2 lanes between Iron Point Road and Alder Creek Parkway over US50 $ 3,000,000 $ 3,840,254 2026-2030
SAC24337 Planned SAC City of Galt
B- Road & Highway
Capacity Carillion Extension new 4 lane road from Simmerhorn to A Street / Boessow $ 2,500,000 $ 4,096,541 2036-2040 SAC24341
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Highway 99 / Ayers Ln.

On/Off Ramp Improvement: widen 1,280 linear feet of Hwy. 99 on/off ramps at Ayers Lane. $ 500,000 Post-2040
SAC24829
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Marengo Extension new 4 lane road (Simmerhorn to A Street at Crystal) $ 2,500,000 Post-2040 SAC24830
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Mingo I/C new interchange at Mingo Road on / off ramps $ 20,000,000 Post-2040 SAC24831
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity New Road A New 4 Lane Road (Mingo I/C to Twin Cities at Carillion) $ 15,300,000 Post-2040 SAC24832
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity New Road B New 4 Lane Road (Mingo I/C to Twin Cities [west sr99]) $ 8,500,000 Post-2040 SAC24165
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Simmerhorn Road Overcrossing Replacement
In Galt: Simmerhorn Road overcrossing of SR 99; Construct realigned overcrossing. $ 4,450,000 Post-2040
SAC24837
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities I/C new interchange at Twin Cities Road $ 15,300,000 Post-2040 SAC20590
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities Rd. Twin Cities Rd. Interchange on Hwy. 99: widen 4 lanes. Includes: bicycle lanes. $ 5,105,100 Post-2040 SAC24833
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities Widening A widening 2 to 4 lanes (Carillion to Cherokee) $ 10,000,000 Post-2040 SAC24834
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities Widening B widening 4 to 6 lanes (Carillion to Marengo) $ 5,000,000 Post-2040 SAC24835
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities Widening C widening 2 to 4 lanes (Fermoy to Carillion) $ 3,000,000 Post-2040 SAC24836
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Twin Cities Widening D widening 4 to 6 lanes (Fermoy to Carillion) $ 2,000,000 Post-2040

Page 46 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24288
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Walnut Ave. / Highway 99
Construct New Interchange: Project Development for eventual Hwy 99 / Walnut Ave. Includes full access freeway interchange and overcrossing. $ 3,649,000 Post-2040 SAC24838
Project
Development Only SAC City of Galt
B- Road & Highway
Capacity Walnut I/C new interchange at Walnut Avenue on / off ramps $ 25,200,000 Post-2040 SAC24375 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Americanos Road, Phase I New 4 lane roadway from Chrysanthy to North of Douglas Road. (Phase 1) $ 3,052,000 $ 3,368,837 2020-2025 SAC25146 Planned SAC
City of Rancho
Cordova
E- Transit Capital
(Vehicles) Autonomous Shuttle Autonomous Shuttle $ 750,000 $ 960,063 2026-2030 SAC24971
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Centennial Drive
New 2 lane road off International Drive South connecting to Grant Line Road including intersection improvements at International, Americanos and Grant Line Rd. $ 10,348,000 Post-2040
SAC24988 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Chrysanthy Blvd
Construct New Road: new 4 lanes from Americanos to Grant Line Rd. Includes:
intersection improvements at Americanos, and Grant Line Rd. $ 10,431,000 $ 12,709,161 2026-2030 SAC24996 Planned SAC
City of Rancho
Cordova A- Bike & Ped Class I Bike Trails Add new Class I bike trails consistent with the City Bike Master Plan $ 5,000,000 $ 5,253,125 2020-2025 SAC25114 Planned SAC
City of Rancho
Cordova A- Bike & Ped Class IV installation Installation of new class IV facilities along existing roadways. $ 400,000 $ 441,525 2020-2025 SAC24824 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Complete Streets Rehabilitation - Sunrise Blvd Rehabilitate Sunrise Blvd. from Folsom Blvd. to Douglas Rd. And construct bicycle and pedestrian improvements. $ 35,000,000 $ 36,771,875 2020-2025 SAC25115 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Connected Vehicle Infrastructure Connected Vehicle Infrastructure $ 1,000,000 $ 1,280,085 2026-2030 SAC25075 Programmed SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Cordova Park Safe Routes to School
In Rancho Cordova: On Coloma Road, Dolecetto Drive, Ellenbrook Drive, and Malaga Way in the Cordova Park neighborhood, construct 7900 feet of curbs, gutters and sidewalks to close gaps in existing pedestrian network, and install curb ramps and crosswalks. A bulbout, Rectangular Rapid Flashing Beacons (RRFB), crosswalks, signage, pedestrian lighting and shade trees will also be added along Coloma Road. $ 2,346,000 2020-2025
SAC24473 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Douglas Rd. Widening
Widen Douglas Rd. from 2 to 4 lanes from Sunrise Blvd. to the West City Limit.

Includes the addition of a new bridge over the Folsom South Canal adjacent to the existing bridge. (See SAC20240) $ 13,000,000 2020-2025 SAC24183 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Easton Valley Pkwy Phase 1
Construct Easton Valley Parkway as a new 4-lane road from Rancho Cordova Parkway to the City Limits including intersection improvements at Rancho Cordova Parkway. $ 10,192,000 2026-2030
SAC24372
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Easton Valley Pkwy. Widening B
Widen: from 4 to 6 lanes from Rancho Cordova Pkwy. to Hazel Ave. with enhanced intersection improvements at Rancho Cordova Pkwy. and Hazel Ave. (Phase II) $ 47,090,000 Post-2040
SAC24993 Planned SAC
City of Rancho
Cordova A- Bike & Ped Folsom South Canal Bike Trail Amenities Amenities including, but not limited ot, way finding signs, bike repair stations, shade strictures, striping, and other amenities as appropriate $ 640,000 $ 706,440 2020-2025 SAC24243 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Grade Separate RT Gold Line At Bradshaw Road Rail Crossing Project: at Bradshaw Road, plan and construct a rail grade seperation for RT s Gold line. $ 12,500,000 $ 20,482,706 2036-2040 SAC24245 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Grade Separate RT Gold Line At Mather Field Road Rail Crossing Project: at Mather Field Road, plan and Construct a Rail Grade Seperation for RT s Gold line. $ 25,000,000 $ 40,965,411 2036-2040 SAC24244 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Grade Separate RT Gold Line At Routier Road Rail Crossing Project: at Routier Road, plan and Construct a Rail Grade Seperation for RT s Gold line. $ 25,000,000 $ 40,965,411 2036-2040 SAC24247 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Grade Separate RT Gold Line At Zinfandel Drive Rail Crossing Project: at Zinfandel Drive plan and Construct a Rail Grade Seperation for RT s Gold line. $ 25,000,000 $ 40,965,411 2036-2040

Page 47 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25113 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Highway 50 ICM
Deployment of various ITS improvements along U.S. 50 and the City of Rancho Cordova, and regionally significant corridors in the County and the City of Folsom for incident management (non-capacity increasing) $ 5,000,000 $ 5,519,064 2020-2025 SAC25112 Planned SAC
City of Rancho
Cordova A- Bike & Ped Install bicycle loop detection at all major intersections A Install bicycle loop detection at all major intersections $ 200,000 $ 220,763 2020-2025 SAC25143 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Interesection safety and operations, cameras and signs Install CCTVs and CMS at various intersections and major corridors within the City $ 600,000 $ 662,288 2020-2025
SAC25110 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Interesection safety and operations, Communications Fill the gaps in field communication infrastructure, including use of fiberoptics, wireless or radio technlogy $ 2,000,000 $ 2,207,626 2020-2025 SAC24471 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity International Dr. A
Construct New Road: 4-lanes from Luyung Drive (western Rio Del Oro Specific Plan Boundary) to White Rock Rd. Includes: intersection improvements at Rancho Cordova Parkway, and White Rock Road. $ 4,219,700 $ 5,141,295 2026-2030 SAC24276
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity International Dr. B
Construct New Road: 4 lanes from Sunrise Blvd. to Rancho Cordova Parkway Includes: intersection improvements at Sunrise Blvd. $ 37,230,800 Post-2040 SAC24989
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity International Dr. C
Construct New Road: International Drive northern 4-lane loop from White Rock Road back to Rancho Cordova Parkway. Includes: intersection improvements at Rancho Cordova Parkway. $ 5,250,600 Post-2040 SAC25142 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Intersection Safety
At various signalized intersections in the City of Rancho Cordova: Upgrade all existing 8" and combination vehicle signal indications to 12" indications.

Retrofit all pedestrian signal heads to "count-down", battery back up systems and pedestrian APS push buttons. $ 550,000 $ 607,097 2020-2025 SAC24707 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Kiefer Blvd Extension
In Rancho Cordova, extend Kiefer Blvd from Rancho Cordova Pkwy to Grant Line as 4 lane road. Includes intersection improvements at Americanos and Grant Line. Developer will deliver project $ 5,621,000 2026-2030 SAC24374 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Kiefer Boulevard, Phase 2
Widen Kiefer Blvd. from 2-4 lanes from Sunrise Blvd. to Rancho Cordova Parkway. $ 3,510,000 2020-2025
SAC24201 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Kilgore Rd. Widen to 2-4 lanes from International Dr. to White Rock Rd. $ 693,000 $ 1,135,561 2036-2040 SAC24202 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Mather Blvd.

Construct New Road:4 lanes from Rockingham Rd. to Zinfandel Dr. Includes:
widening existing roadway to 4 lanes. $ 17,266,000 $ 28,292,351 2036-2040 SAC24204
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Mather Field Rd.

Widen: 6 lanes from Rockingham Rd. to Folsom Blvd. Includes: intersection improvements at Rockingham Rd. $ 2,514,000 Post-2040
SAC24990 Planned SAC
City of Rancho
Cordova
G- System
Management,
Operations, and ITS Mather Field Rd./U.S. 50 Interchange A Construct intersection modification at Mather Field Road., modify on and off ramp configuration and turn pockets, and improve pedestrian connectivity $ 2,000,000 $ 2,436,806 2026-2030 SAC24219
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Mather Field Rd./U.S. 50 Interchange B Interchange Modification: at U.S. 50/Mather Field Rd. $ 20,000,000 Post-2040 SAC24550 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Old Placerville Rd.:International Drive Widening A Widen to 4 lanes from Bradshaw Rd. to Peter McCuen Blvd. Includes:
intersection improvements at Routier Rd. & Mather Blvd. $ 9,389,000 $ 15,384,970 2036-2040 SAC24991
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Old Placerville Rd.:International Drive Widening B Widen to 6 lanes from Bradshaw Rd. to Peter McCuen Blvd. Includes:
intersection improvements at Routier Rd. & Mather Blvd. $ 30,886,000 Post-2040 SAC24317 Planned SAC
City of Rancho
Cordova A- Bike & Ped Pedestrian Facilities and Sidewalk Gap program Pedestrian Improvements: Throughout Rancho Cordova, construct new pedestrian facilities based on Pedestrian Master Plan. Continue Sidewalk Gap project delivery. Includes: grade separations at key locations. $ 12,200,000 $ 19,991,121 2036-2040

Page 48 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24997 Planned SAC
City of Rancho
Cordova A- Bike & Ped Pedestrian Overcrossing at Folsom Lake College Bicycle and pedestrian overcrossing of Folsom Bouleard connecting the Mather Field/Mills SACRT Lght Rail Station to the Bicycle and pedestrian overcrossing of Folsom Bouleard connecting the new Folsom Lake College campus to the Mather Field/Mills SACRT Lght Rail Station to the new $ 4,000,000 $ 6,554,466 2036-2040
SAC24180 Planned SAC
City of Rancho
Cordova A- Bike & Ped Pedestrian Promenade
Bicycle and pedestrian overcrossing of U.S. 50 connecting Olsen Drive to Prospect Park Drive as defined in The Promenade: Connecting and Revitalizing Rancho Cordova Planning Study (reference SAC24157). $ 8,500,000 $ 10,356,425 2026-2030 SAC24586 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Peter A. McCuen Blvd.

Widen to 4 lanes from Mather Blvd. to International Dr. (including Femoyer St).

Includes: intersection improvements at Mather Boulevard, Mather Field Road, Femoyer Street/Air Park Dr. and International Dr. $ 17,571,000 $ 28,792,129 2036-2040 SAC24185
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Phase 1: Americanos Rd.

Construct New Road: 2 lanes from Kiefer Blvd. to Chrysanthy Blvd. Includes:
intersection improvements at Keifer Blvd. and Chrysanthy Blvd. $ 3,423,000 Post-2040 SAC24376
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Phase 2: Americanos Rd.

Construct New Road: 2 lanes from Douglas Rd. to International Dr. Includes:
intersection improvements at International Dr. and Villagio (Phase III) $ 9,247,000 Post-2040 SAC24826
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Promenade Stage 2, Transit Bridges
This project consists of constructing two Bridge structures directly adjacent to the bike/ped Bridge (Pedestrian Promenade). Each of these new Bridge structures will accommodate a transit way (rubber tired or fixed guideway streetcar) in addition to bike and pedestrian movements if desired. The project would provide directl transit linkage between the town center and the employment and residential areas south of Hwy 50. $ 21,600,000 Post-2040 SAC24239 Planned SAC
City of Rancho
Cordova
E- Transit Capital
(Vehicles) Purchase or Lease 23 Shuttles
Replace contracted shuttle fleet with city owned or leased fleet, including three back-up vehicles (23 shuttles total) $ 5,750,000 $ 9,422,045 2036-2040 SAC24316 Planned SAC
City of Rancho
Cordova A- Bike & Ped Rancho Cordova ADA Transition Plan In Rancho Cordova: Continue ADA Transition Plan project delivery including reconstructing curb ramps, repairing sidewalks, installing new curb ramps and new sidewalks, sidewalk bus pad modifications, removal of walkway barriers and traffic signal retrofits. $ 2,500,000 $ 4,096,541 2036-2040 SAC25109 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity
Rancho Cordova Parkway - Rio Del Oro Parkway to Douglas Road
Construct Rancho Cordova Parkway as a six lane roadway from Rio Del Oro Parkway to Villago and a 4 lane roadway from Villagio to Douglas Road, including intersection improvements at Villagio and further improvements at White Rock Road. $ 11,050,000 $ 13,463,352 2026-2030
SAC22980 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rancho Cordova Parkway - White Rock to Rio Del Oro Parkway Construct Rancho Cordova Parkway as a six lane roadway from White Rock to Rio Del Oro Parkway, including intersection improvements at White Rock Road. $ 6,750,000 $ 7,450,737 2020-2025 SAC24630 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rancho Cordova Parkway, Chrysanthy Blvd to Kiefer Road Rancho Cordova Parkway: Widen existing road 2-4 lanes from Chrysanthy Blvd to Kiefer Road $ 3,654,348 $ 4,033,716 2020-2025
SAC24295 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rancho Cordova Pkwy, Grant Line to Kiefer
Construct New Road: 4 lanes from Grant Line Rd. to Kiefer Blvd. Includes intersection improvement at Grant Line Rd. $ 3,876,000 $ 6,351,277 2036-2040 SAC25190 Programmed SAC
City of Rancho
Cordova A- Bike & Ped Rancho Cordova School Zone Improvement Project This project will improve safety around six schools in Rancho Cordova by installing high-visibility crosswalks, ADA-compliant curb ramps, and pedestrianactivated flashing beacons. The project location is adjacent to six elementary schools in north Rancho Cordova; Abraham Lincoln, Cordova Gardens, Cordova Meadows, Cordova Villa, Rancho Cordova and White Rock. $ 1,282,000 2020-2025 SAC24992 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rio Del Oro Pkwy A
Rio Del Oro Parkway: New 4 lane roadway from Sunrise Boulevard to Rancho Cordova Parkway. Includes intersection improvement at Sunrise (CP09-2070) $ 3,413,000 $ 4,368,929 2026-2030

Page 49 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24181
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rio Del Oro Pkwy B
Rio Del Oro Parkway: New 2 lane road from Rancho Cordova Parkway to White Rock Road including intersection improvements at Rancho Cordova Parkway, Americanos Blvd., and White Rock Road (CP09-2070) $ 8,611,000 Post-2040 SAC24371
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Rio Del Oro Pkwy.

Widen: from 2 to 4 lanes from Rancho Cordova Pkwy. to White Rock Rd. (Phase III) $ 3,000,000 Post-2040
SAC24995 Planned SAC
City of Rancho
Cordova A- Bike & Ped Rod Beaudry Cycle Track Improvements Projects includes a raised barrier to protec t cyclists from traffic, painted bike lane or other identifier $ 250,000 $ 262,656 2020-2025
SAC24221 Planned SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Routier Rd.

Widen: from Old Placerville Rd. to Folsom Blvd. including structure over U.S.

Hwy. 50. $ 8,743,000 $ 14,326,424 2036-2040
SAC24994 Planned SAC
City of Rancho
Cordova A- Bike & Ped Routier Road Cycle Track Improvements Projects includes a raised barrier to protect cyclists from traffic, painted bike lane or other identifier $ 500,000 $ 594,343 2026-2030
SAC25145 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Signal Coordination Improvements
Signal Coordination Improvements along significant corridors within the City of Rancho Cordova $ 250,000 $ 275,953 2020-2025
SAC25144 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation STARNET Integration A STARNET Integration with City of Rancho Cordova system $ 40,000 $ 44,153 2020-2025 SAC24468 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Sunrise Blvd - Kiefer Blvd to SR16
Widen Sunrise Boulevard: 2 to 4-lanes from Kiefer Boulevard to State Route 16 (Jackson Highway) and construct partial intersection improvements at Sunrise Boulevard and State Route 16. The project includes modifications to the bridge on Sunrise Boulevard over Laguna Creek. (The $5,227,000 of local agency funds is Sac County funding. City will advance costs and enter into MOU with County for reimbursement for County share.) $ 10,000,000 2020-2025 SAC24210
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Sunrise Complex Improvements
On Sunrise Blvd, construction intersection modifications and pedestrian improvements and include road widening along Sunrise or capacity increasing improvements and modifications at US 50. $ 50,000,000 Post-2040 SAC25111 Planned SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Traffic Signal Installation Install traffic signal at warranted locations within the City of Rancho Cordova $ 750,000 $ 827,860 2020-2025 SAC24182
Project
Development Only SAC
City of Rancho
Cordova
B- Road & Highway
Capacity Villagio
Construct New Road: 2 lanes from Douglas Rd. to White Rock Rd. Includes:
intersection improvements at Douglas Rd., Rancho Cordova Pkwy., International Dr., Americanos Rd., and White Rock Rd. $ 2,608,000 Post-2040 SAC24470 Programmed SAC
City of Rancho
Cordova
B- Road & Highway
Capacity
White Rock Rd. - Construct Sunrise Blvd. to City Limits; Environmental Sunrise to Grant Line
Environmental will be for both this project and the County of Sacramento project SAC24249. Environmental completed for White Rock Road Sunrise Blvd to Grant Line Road. Construction will include: On existing 6-lane White Rock Rd., from Sunrise Blvd. to Luyung Dr.: construct improvements, including Class II bikeway. On White Rock Rd from Luyung Dr. to eastern City Limits:
widen and reconstruct from 2 to 4 lanes and construct Class II bikeway. (CMAQ funds only to be used for new bicycle facilities.) (Emission Benefits in kg/day:

0.03 ROG, 0.03 NOx, 0.02 PM10). Additional construction will be completed under the Sacramento County project SAC24662. $ 18,366,000 2020-2025 SAC24703 Programmed SAC
City of Rancho
Cordova
C- Maintenance &
Rehabilitation Zinfandel Complex Improvements
On Zinfandel Dr., from westbound US 50 off-ramp to White Rock Rd. widen southbound travel lanes from 2 to 3 lanes. On the eastbound US 50 off-ramp at Zinfandel, from Zinfandel Dr. intersection to US 50, widen from 4 to 6 lanes.

On westbound US 50 off-ramp at Zinfandel, from Zinfandel Dr. intersection to US 50, widen from 3 to 4 lanes. On Gold Center Dr. at Zinfandel Dr intersection, widen by 6 feet for 300 feet. On Zinfandel Dr., from White Rock Dr to the WB US 50 off-ramp, add bicycle lanes. at the WB US 50 off ramp, EB 50 on ramp/on ramp and Gold Center Dr at the Zinfandel Dr intersections:
build pedestrian refuge islands. On the NB to WB US 50 on-ramp, reduce from 2 lanes to 1 lane to accommodate pedestrian refuge island and reduce crossing width. Adding overhead signage. $ 7,101,500 2020-2025

Page 50 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24828 Planned SAC
City of Rancho
Cordova A- Bike & Ped Zinfandel Complex Improvements - Phase2 Construct intersection and pedestrian improvements on Zinfandel Drive between White Rock Road and Folsom Blvd, including modifications at US 50/Zinfandel to improve safety and ease congestion along the corridor, including bridge widenings, ramp and intersection reconstruction and reconstruction of intersections. $ 45,968,000 $ 75,323,921 2036-2040 SAC24610 Programmed SAC
City of
Sacramento
B- Road & Highway
Capacity 14th Ave. Extension Phase 1
Sacramento. Extension of 14th Avenue from Power Inn Rd to Florin-Perkins.

Phase I includes environmental/PE for four lane roadway and construction of two-lane roadway with class II bicycle lanes and landscape planter/sidewalks on the south side of the roadway. Also includes new water and drainage facilities, new streetlights, new traffic signal at 14th Ave/Florin Perkins Rd, and modification to existing traffic signal. (Phase 2 SAC24656, Phase 3 SAC24657) $ 12,000,000 2020-2025 SAC24656
Project
Development Only SAC
City of
Sacramento
B- Road & Highway
Capacity 14th Ave. Extension Phase 2
Sacramento. 14th Ave., from Power Inn Road to Florin Perkins, widen from 2 to 4 lanes. Construction includes bike lanes, landscaped center median, landscaping and sidewalk on north side of street. Retaining wall along north side of project. (PE/ENV included in Phase 1, SAC24610) $ 10,000,000 Post-2040 SAC24657
Project
Development Only SAC
City of
Sacramento
B- Road & Highway
Capacity 14th Ave. Extension Phase 3
Sacramento. 14th Avenue from Florin-Perkins Rd to Watt Ave: extend as a four lane road. $ 16,000,000 Post-2040
SAC24623 Programmed SAC
City of
Sacramento A- Bike & Ped 16th Street Streetscape
On 16th Street from S Street to N Street, pedestrian improvements including bulb-outs, landscaping and trees, banners, pavement treatments, bike racks, and street furniture,and street lights. $ 2,680,000 2031-2035 SAC25017 Programmed SAC
City of
Sacramento A- Bike & Ped 16th Street Streetscape - H st. to Richards Blvd.

North 16th St./Lincoln Highway, from H St. to Richards Blvd.: Streetscape improvements, including restriping travel lanes to 11 feet, on street parking on both sides, curbs, six foot separated sidewalk, and pedestrian lighting. $ 8,000,000 2020-2025 SAC25246 Planned Sac
City of
Sacramento
C- Maintenance &
Rehabilitation 65th Area Plan Projects
ITS, Roadway, Bike, and pedstrian improvements to implement the 65th Street Transit Station Area Specific Plan, including 67th Street Extenstion from Folosm Boulevard to Elvas Avenue $ 12,000,000 $ 17,814,067 2036-2040 SAC23630 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity 65th St. Widen: 5 lanes from Hwy. 50 to Broadway. $ 8,000,000 $ 11,586,385 2031-2035 SAC25255 Planned Sac
City of
Sacramento
C- Maintenance &
Rehabilitation ADA Improvements Accessibilty improvements to meet current accessibilty requirements $ 60,000,000 $ 89,070,337 2036-2040 SAC24693 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Auburn Blvd. Bridge Replacement
Auburn Blvd. over Arcade Creek, at Winding Way: Replace existing five lane bridge with a new five lane bridge $ 10,126,504 2020-2025 SAC24633 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Bridge Preventive Maintenance Program B
Various Locations in the City of Sacramento: rehabilitate bridges. For locations and detail, see Caltrans Local Assistance HBP website. $ 4,200,000 2020-2025 SAC22530 Programmed SAC
City of
Sacramento A- Bike & Ped Bridging I-5/Riverfront Reconnection Phase 3 Environmental clearance/PE for Riverfront Reconnection. Construct connection over I-5 between approximately Capitol Ave. to "O" St. (T15998100) Phase 1 constructed under SAC24705 $ 9,432,709 2020-2025 SAC25051 Programmed SAC
City of
Sacramento
B- Road & Highway
Capacity Broadway Complete Street Phase I
Phase I: In Sacramento, Broadway from 3rd St to 16th St, convert four lane arterial to two lane arterial with buffered bike lanes, median improvements, sidewalk improvements and streetscape enhancements. Create surface street (29th St.) from X St. to Hwy 99 South. PA&ED will be completed for the entire 2- mile corridor, from 29th St. to 3rd St. $ 4,414,000 2020-2025 SAC24557 Planned SAC
City of
Sacramento A- Bike & Ped Central City Specific Plan Multi-modal improvements.

Two-way conversions, three to two lane conversions, freeway ramps, buffered bike lanes, Ped, Transit, and Bike Projects (see Table A-3 from Central City Specific Plan) $ 165,000,000 $ 211,213,950 2026-2030
SAC24719 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Complete Streets Rehabilitation - Bell Ave.

Bell Ave. from Bollenbacher Ave. to Astoria St.,: rehabilitate pavement, fill in sidewalk gaps, add new bicycle lanes, add two-way left turn lanes, and add bus pullouts. (Toll Credits for PE and CON). Toll Credits for ENG, CON $ 5,759,968 2020-2025

Page 51 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24722 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Complete Streets Rehabilitation and Road Diet - Fruitridge Rd.

Fruitridge Rd., from Power Inn Rd to Stockton Boulevard.,: Reduce from four lanes to two lanes. rehabilitate sidewalks up to standard, and add bicycle lanes, actuated crosswalks, and new crosswalks. (Toll Credits for PE and CON).

T15036300. Toll Credits for ENG, CON $ 5,000,000 2020-2025 SAC25026 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Corridor Street Lighting
Three corridors: On Freeport Bl from Meadowview Rd to Florin Rd, on Rio Linda Bl from North Ave to Claire Ave, and on Meadowview from Amherst to 24th St.: Install street lighting. (Toll Credits) HSIP7-03-014. Toll Credits for CON $ 5,000,000 2020-2025 SAC25248 Planned SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Cosumnes River Boulevard
Improve safety and operations of CRB and three intersections at Franklin Boulevard, Center Parkway, and Bruceville Road $ 15,000,000 $ 22,267,584 2036-2040 SAC25000 Programmed SAC
City of
Sacramento A- Bike & Ped D W Babcock School Access Improvements City of Sacramento: Woolley Way from Albatross to DW Babcock School; Cormorant Way from DW Babcock School to Babcock Park: Construct sidewalks, install a signalized intersection with accessibility compliant crosswalks at the intersection of Albatross Way and El Camino Avenue., curb ramps, and other access improvements for students who attend D.W. Babcock School. $ 1,124,700 2020-2025
SAC24139 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Del Paso Rd
In Sacramento,from I-5 N/B offramp to East Commerce (north side only), widen Del Paso Road. $ 516,000 $ 542,123 2020-2025
SAC24999 Programmed SAC
City of
Sacramento A- Bike & Ped Del Rio Trail
Along unused rail corridor near Freeport Blvd from Sutterville Road to south of Meadowview/Pocket Road (4.5 miles): Build rails]to]trails project. (Emission Benefits in kg/day: 0.06 ROG, 0.04 NOx, 0.02 PM 10) $ 15,000,000 2020-2025 SAC24499 Planned SAC
City of
Sacramento A- Bike & Ped Docks Riverfront Promenade
In Sacramento, extend pedestrian/bicycle riverfront promenade from R St to Pioneer Bridge. Relocation and reconstruction of main rail line.

Pedestrian/bicycle paths, benches, lighting, interpretative signs, rail crossings, and on-street bicycle lanes. $ 20,000,000 $ 29,690,112 2036-2040 SAC25013 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Downtown Controller and Communications Upgrade Phase 2 Phase 2, in Downtown Sacramento: On 15th St., 16th St., 19th St, 21st St. and J St: Replace 246 existing end of life controllers, install fiber cables in existing conduits, install fiber switches, and replace some cabinets and CCTVs. $ 3,243,000 2020-2025 SAC24497 Programmed SAC
City of
Sacramento
D- Programs &
Planning Downtown Sacramento Transportation Study: East Broadway Downtown Sacramento, bounded by Broadway extending into the Oak Park neighborhood, Sacramento River, American River, and Alhambra Blvd. $ 1,200,000 2020-2025 SAC25025 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Downtown Signal Improvements
Various downtown corridors bounded by I-5, Broadway, Alhambra Blvd., and C St., including the intersections of North 16th St/Sproule St-Basler St and North 16th St/North B St: Install pedestrian countdown signal heads; replace 8" with 12" vehicle signal heads; install emergency vehicle preemption equipment. (Toll credits) (HSIP7-03-013). Toll Credits for CON $ 3,142,600 2020-2025 SAC25160 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Duckhorn Dr. Safety
Duckhorn Drive from Arena Boulevard to Far Niente Way: Install curve warning signs and install raised medians. (H9-03-016) $ 841,600 2020-2025 SAC18460 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity East Commerce Way A
In Sacramento, East Commerce Way from Club Center Drive to Del Paso Rd, extend as a 6-lane facility. $ 8,142,225 $ 8,554,425 2020-2025 SAC18570 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity East Commerce Way B
In Sacramento, extend East Commerce Way from Arena Blvd. to Natomas Crossing Drive, as a 6 lane road. $ 3,329,000 $ 5,454,954 2036-2040 SAC18580 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity East Commerce Way C
Extend East Commerce Way from planned Natomas Crossing Drive to San Juan Rd. as a 4 lane road. $ 4,000,000 $ 5,938,022 2036-2040 SAC18740 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity El Centro Rd. New Overcrossing: El Centro Rd. overcrossing. $ 11,000,000 $ 16,329,562 2036-2040 SAC23680 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Elder Creek Rd. Widen: 4 lanes from Florin Perkins Rd. to South Watt Ave. $ 7,000,000 $ 8,320,800 2026-2030 SAC18510 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Elkhorn Boulevard
In Sacramento, Elkhorn Boulevard from SR 99 to east city limits: widen from 2 to 6 lanes. $ 14,000,000 $ 20,783,079 2036-2040

Page 52 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25162 Programmed SAC
City of
Sacramento A- Bike & Ped Florin Rd. Safety
Various segments along Florin Road: Install raised median, install pedestrian hybrid beacons, and add pedestrian fencing to encourage crossings at protected crossing locations. (H9-03-018) $ 1,414,200 2020-2025 SAC24402 Planned SAC
City of
Sacramento A- Bike & Ped Folsom Blvd Operations and Maintenance Folsom Blvd. from Power Inn Road to Watt Avenue; streetscape project including pedestrian and bicycle improvements, a raised landscaped median, landscaped planters, improvements to signal operations, frontage landscaping, and enhanced connections to transit facilities. $ 19,500,000 $ 22,062,460 2020-2025 SAC24535 Planned SAC
City of
Sacramento A- Bike & Ped Folsom Blvd. Streetscape Project: Folsom Blvd from Power Inn. to Ramona. $ 6,000,000 $ 6,788,449 2020-2025 SAC25009 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Franklin Boulevard Streetscape
In the City of Sacramento, on Franklin Blvd., from Sutterville Rd./12th Ave. to the Sacramento County Line: Reduce travel lanes from four to two lanes, add bicycle lanes, install landscaping and landscaped medians, and provide onstreet parking. $ 12,000,000 2020-2025 SAC25021 Programmed SAC
City of
Sacramento A- Bike & Ped Franklin Cycle Track
On Franklin Blvd. between Cosumnes River Blvd. and the southern city limit near Francesca St.: Construct one-way Class IV bikeways. (Emission Benefits in kg/day: 0.02 ROG, 0.01 NOx, 0.01 PM10. 0.01 PM2.5) $ 1,100,000 2020-2025 SAC23810 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Highway 99 Meister Way Overcrossing New Overcrossing: Meister Wy. / Hwy. 99. $ 8,000,000 $ 9,051,266 2020-2025 SAC24683 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation I St. Bridge Replacement
I Street Bridge, over Sacramento River and complex of bridge approach structures. Replace existing 2 lane bridge with a 2 lane bridge on a new alignment. Project includes bridge approaches 22C0154, 24C0006, 24C0364L, 24C0364R, 24C0351J. $ 172,000,000 2020-2025
SAC18660 Planned SAC
City of
Sacramento
G- System
Management,
Operations, and ITS I-5 Add Auxiliary Lane: NB from Del Paso Rd. to Hwy. 99. $ 857,000 $ 1,272,221 2036-2040 SAC18670 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity I-5 / Highway 99 On/Off Ramp Improvement: Add 2nd on-ramp at I-5 / Hwy. 99 Interchange. $ 216,000 $ 256,756 2026-2030 SAC18170 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation I-5 at Richards Blvd. Interchange
Sacramento, Richards Blvd. and I-5; reconstruct interchange (ult). (HPP #3784)(T15165100) $ 39,598,000 2026-2030
SAC18650 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity I-80 at West El Camino Interchange
Expand the West El Camino interchange on I-80 from 2 to 4 lanes and modify ramps. $ 30,000,000 $ 43,448,945 2031-2035
SAC25024 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Intersection Dilemma Zone Loops
Six locations throughout the City of Sacramento: Install advanced dilemma zone loops for the high speed approaches at six existing signalized intersections. (Toll Credits for all phases) HSIP7-03-012. Toll Credits for CON $ 415,300 2020-2025 SAC25163 Programmed SAC
City of
Sacramento A- Bike & Ped Lampasas Blvd. at Rio Linda Ave. Intersection Safety Intersection of Lampasas Boulevard and Rio Linda Avenue: Restripe and realign approaches to improve sight distance, install pedestrian refuge island on uncontrolled pedestrian crossing, and install enhanced pedestrian crossings across all legs. (H9-03-019) $ 1,286,800 2020-2025
SAC24539 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Lower American River Crossing
New all-modal Bridge: between downtown Sacramento and South Natomas across the Lower American River. Includes: Auto, transit, bicycle, and pedestrian facilties. Scale and features to be determined through need and purpose study anticipated to begin in 2012. $ 150,000,000 $ 217,244,725 2031-2035 SAC24536 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Main Ave. A Road Extension: 2 lanes from Rio Linda Blvd. to Marysville Blvd. $ 3,000,000 $ 4,453,517 2036-2040 SAC23440 Planned SAC
City of
Sacramento A- Bike & Ped Mangan Park
Bikeway Facilities: 0.6 mile in City of Sacramento Mangen Park from 24th St. to Freeport Blvd. Bike trail south in Executive Airport right-of-way. $ 800,000 $ 840,500 2020-2025 SAC24742 Programmed SAC
City of
Sacramento A- Bike & Ped Meadowview Rd. Streetscape Project - Phase 2 Meadowview Rd. from the light rail station to I-5 and along 24th St from Meadowview Rd. to Florin Rd. including medians, sidewalk treatments, and crosswalks. Planning and environmental review for entire segment. Phase 1 construction in SAC25010. $ 3,119,395 2020-2025

Page 53 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24998 Programmed SAC
City of
Sacramento A- Bike & Ped North 12th Complete Street Phase 2 In Sacramento, on N. 12th Street from American River to H Street, including Sunbeam Street and one block of Richards Blvd.: Convert westernmost travel lane between Richards and H Street into two-way cycle track and improve connection from Two Rivers Bike Trail to Richards Blvd. Install streetscape and safety improvements, including intersection improvements, traffic control devices, striping, signage, pedestrian islands, dedicated turn lanes, on-street parking, and related streetscape, landscape, and adjacent improvements. $ 4,467,000 2020-2025 SAC18700 Planned SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Northgate Blvd.

On/Off Ramp Improvement: Extend existing I-80 WB off-ramp at Northgate Blvd. / I-80 Interchange. Includes: auxiliary lane to WB on-ramp. $ 15,000,000 $ 22,267,584 2036-2040 SAC25063 Programmed SAC
City of
Sacramento A- Bike & Ped Northwood School and Transit Access Improvements Northern Sacramento City near the Northwood Elementary School and Swanston Light Rail Station: Construct curbs, gutters, sidewalks, crosswalks, and curb ramps on Frienza Ave, Clay St., Lexington St., and El Camino Ave.. Toll Credits for ENG $ 2,541,000 2020-2025
SAC25247 Planned Sac
City of
Sacramento
B- Road & Highway
Capacity Panhandle Roadways
Transportation improvements to implement Panhandle annexation and development $ 10,000,000 $ 14,845,056 2036-2040
SAC25056 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation Pedestrian and Signal Safety Improvements At various locations in Sacramento: Replace pedestrian signal heads with countdown signal heads, install 12" vehicle heads, install emergency vehicle preemption equipment, and replace median island signals with mast arm signals. (H8-03-012). Toll Credits for CON $ 5,292,800 2020-2025 SAC25251 Planned Sac
City of
Sacramento A- Bike & Ped Pedestrian Crossing Improvement Implementation Crossing improvements at uncontrolled crossings $ 40,000,000 $ 46,387,737 2026-2030 SAC25058 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Pedestrian Signal Safety Improvements, Florin Area Florin Road between Greenhaven Drive and Luther Drive.: Convert from pedestal mounted to mast arms at 7 intersections; Install advanced detection at Florin Rd/24th St, and Florin Rd/Freeport Blvd; Install communications fiber; Install Countdown Ped Heads; and Replace 8" with 12" LED 3 Section Heads.(H8-03-014). Toll Credits for CON $ 2,555,400 2020-2025 SAC25059 Programmed SAC
City of
Sacramento
C- Maintenance &
Rehabilitation
Pedestrian Signal Safety Improvements, Natomas and South Sacramento Area
Various intersections in the Natomas and South Sacramento Area: Replace pedestrian signal heads with countdown pedestrian heads. (H8-03-015). Toll Credits for CON $ 247,700 2020-2025
SAC25027 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Pedestrian Signals
At 9 locations throughout the City of Sacramento: Install 8 Pedestrian Hybrid Beacons and 1 Pedestrian Signal(HAWK) at uncontrolled crosswalks. (Toll Credits) HSIP7-03-015. Toll Credits for CON $ 1,751,300 2020-2025 SAC16070 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Power Inn Rd. Widen: 6 lanes from Fruitridge Rd. to 14th. $ 30,000,000 $ 44,535,169 2036-2040 SAC24537 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Railyards Streets
Construct New Road/Bike/Ped Improvements to implement Railyards Specific Plan $ 163,000,000 $ 208,653,781 2026-2030
SAC19550
Project
Development Only SAC
City of
Sacramento
B- Road & Highway
Capacity Raley Blvd. Widen: 4 lanes from Santa Ana Ave. to Ascot Ave. $ 2,000,000 Post-2040 SAC24654 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity Ramona Avenue Phase II
Ramona Avenue: Widen and add new frontage improvements from Cucamonga to Brighton. Environmental review completed under SAC22610. (No new travel lanes.) $ 5,000,000 $ 5,798,467 2026-2030 SAC25245 Planned Sac
City of
Sacramento A- Bike & Ped River District Transportation Improvements Roadway, bikeway, and pedestrian improvements to implement the River District Specific Plan. $ 120,000,000 $ 178,140,674 2036-2040 SAC25254 Planned Sac
City of
Sacramento
C- Maintenance &
Rehabilitation Roadway Pavement Maintenance Backlog To maintain current PCI $ 400,000,000 $ 655,446,576 2036-2040

Page 54 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24898 Planned SAC
City of
Sacramento
E- Transit Capital
(Major) Sacramento Intermodal Transportation Facility - Phase 3 Intermodal Facility Phase 3 project is the creation of a larger multi-modal transportation center that can meet the region’s expanded transportation needs and accommodate high speed trains, commuter rail, light rail, streetcars, transit bus lines, and intercity buses. It will involve relocating the existing LRT station to a north-south alignment; expansion of the terminal facilities including passenger amenities and spaces, transportation operations areas, site and circulation improvements and joint development $ 225,000,000 $ 334,013,765 2036-2040 SAC25249 Planned Sac
City of
Sacramento A- Bike & Ped Short-term Bikeway Project Implementaiton Priority projects identified in the Bicycle Master Plan $ 52,000,000 $ 60,304,058 2026-2030 SAC18710 Planned SAC
City of
Sacramento A- Bike & Ped Snowy Egret Wy.

New bike/ped overcrossing: for the planned Snowy Egret Wy. that will run eastwest from El Centro Rd. to Commerce Wy. crossing over I-5. $ 10,000,000 $ 12,184,029 2026-2030 SAC24745 Programmed SAC
City of
Sacramento A- Bike & Ped South Sacramento Parkway Trail - West Adjacent to I-5, south of Pocket Road/Meadowview Road and Freeport Boulevard, build Class I bike trail connecting the Freeport Shores Bike Trail to the existing North Delta Shores Bike Trail. (Emission Benefits in kg/day: 0.12 ROG, 0.07 NOx, 0.02 PM 2.5, 0.02 PM10) $ 914,000 2020-2025 SAC18690 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity SR 99 Elkhorn Boulevard Interchange
In Sacramento County :Expand the Elkhorn Blvd. interchange on Route 99 to accommodate the widening of Elkhorn Blvd. from 2 to 6 lanes $ 15,000,000 $ 24,579,247 2036-2040 SacCity1 Planned SAC
City of
Sacramento
G- System
Management,
Operations, and ITS SR 99 Mack Road Interchange
Sacramento. Construct improvements at the State Route 99/Mack Road interchange to improve operations and relieve congestion. The project will also construct improvements along Mack Road and Stockton Boulevard in close proximity to the interchange. $ 20,000,000 $ 29,690,112 2036-2040 SAC25252 Planned Sac
City of
Sacramento
C- Maintenance &
Rehabilitation Street maintenance Street maintenance $ 240,000,000 $ 356,281,349 2036-2040 SAC25253 Planned Sac
City of
Sacramento
G- System
Management,
Operations, and ITS Traffic Signal Grid Traffic signal list $ 8,500,000 $ 9,857,394 2026-2030 SAC25028 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Traffic Signal Replacement
Five signalized locations throughout the City of Sacramento: Install mast arm traffic signals to replace traffic signal heads mounted on pedestals in median. (Toll credits) HSIP7-03-016. Toll Credits for CON $ 1,346,500 2020-2025 SAC24755 Planned SAC
City of
Sacramento A- Bike & Ped Two Rivers Trail Phase 3
On the American River Parkway, construct a new Class I Western segment between Sutter's Landing and the California State University of Sacramento (CSUS) campus. PE for Phase 2 and 3 was completed as part of SAC24486. $ 3,000,000 $ 3,655,209 2026-2030 SAC24486 Programmed SAC
City of
Sacramento A- Bike & Ped Two Rivers Trail Phase II
Study and design bike/ped connections between the Northern Bicycle Trail and Sutter's Landing Park (Phase 2 and 3). Build Phase 2, construct the eastern segment of the multi-use path, connecting the American River Parkway at H St. in East Sacramento to the trail at Sutter’s Landing Park in Midtown. Additional study future bicycle trial connections across the American River, Crossing the Capitol City Freeway, and extending east along the American River towards California State University at Sacramento. Phase 3 construction scope shown in SAC24755. (Emission Benefits in kg/day: 0.02 ROG, 0.02 NOx, 0.02 PM10) K15125000. Toll Credits for ENG $ 6,398,422 2020-2025
SAC25161 Programmed SAC
City of
Sacramento
G- System
Management,
Operations, and ITS Valley Hi Drive/La Mancha Way Safety Valley Hi Drive/La Mancha Way between Creek Centre Court and Wyndham Drive: Install raised median to reduce access conflicts, install traffic signal, and add pedestrian fencing. (H9-03-017) $ 1,706,600 2020-2025 SAC25250 Planned Sac
City of
Sacramento
G- System
Management,
Operations, and ITS Vision Zero Traffic Safety Implementation Traffic safety improvements along the High Injury Network $ 107,000,000 $ 124,087,196 2026-2030 SAC16130 Planned SAC
City of
Sacramento
B- Road & Highway
Capacity W. El Camino Ave.

Widen: 6 lanes West El Camino Interchange. Includes: bike lanes at I-80 / Natomas Main Drainage Canal. $ 24,000,000 $ 39,326,795 2036-2040

Page 55 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
REG18055 Programmed SAC RT
E- Transit Capital
(Minor) El Dorado County Transit Authority-Bus Washer Retrofit Retrofit Bus Washer Facility. Will allow use of original bay and foundation with replacement washer unit. Current unit installed in 1997. Replacement parts difficult to find. $ 110,000 2020-2025
REG18053 Programmed SAC RT
E- Transit Capital
(Minor) Fare Vending Machines
Purchase fare vending machines for light rail stations and support equipment for FVM monitoring $ 223,723 2020-2025
REG18047 Programmed SAC RT
E- Transit Capital
(Major) Folsom Gold Line Service Enhancements
Construct side tracking needed to increase Gold Line frequencies from 30 minutes to 15 minutes on the segment between Sunrise Station in Rancho Cordova and Historic Folsom station in Folsom.. Toll Credits for ROW $ 48,400,000 2020-2025 REG18043 Programmed SAC RT
E- Transit Capital
(Major)
Green Line SVS Loop & K St. to H St. Improvements (Final Design & Construction)
In Sacramento, two elements to accommodate the future Streetcar Project as well as future Green Line service: (1) SVS Loop - segment of the Green Line at the Sacramento Valley Station including: Relocate the existing/temporary LRT Station on H Street to a new north-south axis west of 5th Street; New platform and LRT station near the existing Amtrak station; new Station on the east side of N 7th near Railyards Boulevard that would serve the future MLS Stadium area; double-tracking on H Street from 7th to west of 5th, from west of 5th north to new station near Amtrak, and east along a future F Street. RT has been working with the City of Sac and the MLS Developers to advance this concept. (2) Relocation of the existing LRT tracks on K Street from 12th Street west to 7th Street. The tracks would be relocated to the center of (future) twoway H Street and would connect the LRT line between 12th and 7th & 8th Streets with new stations near 12th Street and City Hall on H Street. SacRT has been working with the City of Sac and SACOG to advance this concept.

Expanded SacRT facilities will include track, special trackwork, Overhead Catenary System, traction power system, signaling system, platforms, and storage tracks. $ 60,037,572 2020-2025
REG18049 Programmed SAC RT
E- Transit Capital
(Vehicles) Sacramento Airport Zero Emission Bus Service Ten (10) Zero Emission Buses (ZEBs) and associated chargers and electric charging infrastructure to be used in new public transit service between Downtown Sacramento and Sacramento International Airport. $ 10,918,130 2020-2025 SAC25062 Programmed SAC
Sacramento
County A- Bike & Ped 47th Ave Pedestrian and Bicycle Improvement 47th Ave., between the City of Sacramento/Sacramento County border and light rail tracks (western limit) to Stockton Boulevard (eastern limit): Construct continuous 2-mile Class II bicycle and pedestrian facility. $ 4,235,000 2020-2025 SAC24839 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Aerojet Rd Construct New 4 lane road between Easton Valley Parkway and Folsom Blvd. $ 10,000,000 $ 10,768,906 2020-2025 SAC24280
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Alta Florin Rd.

Construct New Road: 4 lanes from Power Inn Rd. to Florin-Perkins Rd. (Runs parallel and north of Florin Rd.) Includes: Railroad grade separation. $ 30,000,000 Post-2040 SAC24618 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Alta Mesa Rd Bridge Replacement
Alta Mesa Rd over Laguna Creek, 0.4 mi north of SR 104: Replace existing structurally deficient 2-lane bridge with a new 2-lane bridge. $ 9,765,975 2020-2025 SAC22020 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Antelope North Road Widening
In Sacramento County, Antelope North Road, from Poker Ln. to Olive Ave.:

Realign and widen to 4 lanes. $ 3,020,000 $ 4,948,622 2036-2040 SAC24264 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Antelope Rd. Widen Antelope Road to 4 lanes from Watt Ave. to Elverta Rd $ 9,307,473 $ 13,479,996 2031-2035 SAC19790
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Antelope Road Widening Antelope Road from Watt Avenue to Roseville Road: widen from 4 to 6 lanes. $ 735,000 Post-2040 SAC25029 Programmed SAC
Sacramento
County A- Bike & Ped Bike and Ped Safety Improvements
On Auburn Blvd., beginning 200' west of Annadale Ln., continuing eastward to Winding Wy.: Construct sidewalk infill, Class II bike lanes, and install a pedestrian Hawk type signal, located near the intersection of Auburn Blvd. and Annadale Ln. HSIP7-03-017. Toll Credits for CON $ 2,044,000 2020-2025

Page 56 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC19840 Planned SAC
Sacramento
County A- Bike & Ped Bike/Ped Improvements
Bikeway Facilities: In various Sacramento County locations. Includes: 2010 Bikeway Master Plan Implementation. $ 50,000,000 $ 81,930,822 2036-2040 SAC24840 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Birkmont Drive Construct New 4 lane road between Easton Valley Parkway and Folsom Blvd. $ 10,000,000 $ 10,768,906 2020-2025 SAC24224 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Bradshaw Rd. Widening A Widen: 6 lanes between Old Placerville Rd. and Florin. $ 37,500,000 $ 45,690,109 2026-2030 SAC24844 Planned SAC
Sacramento
County
B- Road & Highway
Capacity
Cordova Hills, Chrysanthy Blvd Ext. from Grant Line Road to Town Center Blvd
New 4 lane roadway on Chrysanthy Blvd Ext. from Grant Line Road to Town Center Blvd with median, landscaping, sidewalks, 1 traffic signals at Town Center Blvd $ 2,160,000 $ 3,539,412 2036-2040
SAC24841 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, North Loop Road
New 4 lane roadway on North Loop Road from Grant Line Road to Street "F" with NEV/Bike lanes, median, landscaping, sidewalks, 4 traffic signals at Town Center Blvd, Street "D" and Primary Residential Street between Street "D" and Street "F" and Street "F", roundabout at Street "A" $ 20,990,000 $ 34,394,559 2036-2040 SAC24847 Planned SAC
Sacramento
County
B- Road & Highway
Capacity
Cordova Hills, Street "A" (south of St. "B") to Street "A" (south of North Loop Rd.)
New 2 lane roadway from Street "A" (south of St. "B") to Street "A" (south of North Loop Rd.) with Class 2 Bike Lines, NEV Compact, landscaping, sidewalks $ 5,800,000 $ 8,610,133 2036-2040 SAC24848 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, Street "A" to Street "C"
New 2 lane roadway from Street "A" to Street "C" with Class 2 Bike Lines, NEV Compact, landscaping, sidewalks $ 1,160,000 $ 1,722,027 2036-2040 SAC24845 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, Street "A" to Street "F"
New 2 lane roadway from Street "A" to Street "F" with NEV/Bike lanes, median, landscaping, sidewalks $ 7,651,000 $ 8,239,290 2020-2025 SAC24850 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, Street "A" to University Ave
New 2 lane roadway from Street "A" to University Ave with Class 2 Bike Lines, NEV Compact, landscaping, sidewalks $ 3,480,000 $ 4,136,626 2026-2030 SAC24846 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, Street "E" to North Loop Rd
New 2 lane roadway from Street "E" to North Loop Rd with Class 2 Bike Lines, NEV Compact, median, landscaping, sidewalks, traffic signal at Street "B" and 1 roundabout at Street "D" $ 7,334,000 $ 8,717,821 2026-2030 SAC24849 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, Street A to North Loop Rd
New 2 lane roadway from Street "A" to North Loop Rd with Class 2 Bike Lines, NEV Compact, median, landscaping, sidewalks, and 2 roundabouts at Street "A" and University Blvd $ 8,167,500 $ 9,708,591 2026-2030 SAC24851 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, University Ave to North Loop Rd New 2 lane roadway from University Ave to North Loop Rd with Class 2 Bike Lines, NEV Compact, landscaping, sidewalks $ 2,320,000 $ 2,498,386 2020-2025 SAC24842 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, University Blvd
New 4 lane roadway on University Blvd from Grant Line Road to Street "A" with NEV/Bike lanes, median, landscaping, sidewalks, 3 traffic signals (at Town Center Blvd, and 2 between Town Center Blvd and Street "A"), roundabout at Street "A" $ 12,056,000 $ 19,755,160 2036-2040
SAC24843 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Cordova Hills, University Blvd to North Loop Rd New 2 lane roadway from University Blvd to North Loop Rd with Class 2 Bike Lines, NEV Compact, median, landscaping, sidewalks, 3 traffic signals and 2 roundabouts $ 6,875,000 $ 10,205,976 2036-2040
SAC25128 Planned SAC
Sacramento
County
G- System
Management,
Operations, and ITS Countywide Intelligent Transportation Systems Enhancements The Sacramento County Transportation Development Fee Program has identified twenty-seven(27) roadway segments throughout the County that will require ITS enhancements. This work includes upgrades to the signal controllers, communication to the Traffic Operations Center (TOC) network, Changeable Message Signs (CMS), and traffic data collection facilities. It will also provide for expansion of the TOC facilities to accommodate future network growth as well as incident management and traveler information systems. $ 95,000,000 $ 141,028,034 2036-2040
SAC19610
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Cypress Ave. Widen: 4 lanes from Pasadena Ave. to Manzanita Ave. $ 10,441,000 Post-2040 SAC24520 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Dillard Rd. Bridge Scour Countermeasures Dillard Rd., over Cosumnes river, 0.2 miles south of S.R. 16: Install scour countermeasures on scour critical bridge. $ 1,278,751 2020-2025

Page 57 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25241
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Don Julio Blvd. - Elverta Rd. to N. Loop Blvd.

In Sacramento County, Don Julio Boulevard from Elverta Road to N. Loop Boulevard; Widen from 2-4 lanes with raised landscaped median, curb, gutter and sidewalk, improvements also includes a traffic signal modification at Don Julio/Titan Drive&Poker Lane and Don Julio/Antelope Road. $ 2,400,000 Post-2040 SAC24663 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Douglas Rd. - Zinfandel Dr. to Rancho Cordova City Limit Widen Douglas Road, from Zinfandel Drive to Rancho Cordova west City Limits, from 2 to 4 lanes. $ 2,400,000 $ 2,924,167 2026-2030
SAC22410 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Douglas Road Extension
In Sacramento County, Douglas Road from Zinfandel Drive to Kiefer Boulevard; new 4 lane roadway with raised landscaped median, curb, gutter and sidewalk, improvements also include installation of traffic signals at Douglas/Kiefer and Douglas/Excelsior Road. $ 19,837,200 $ 24,169,702 2026-2030 SAC24529 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Easton Valley Pkwy. Widening A Construct New Road: 4 lanes from Hazel Ave. to Prairie City Rd. $ 36,000,000 $ 38,768,063 2020-2025 SAC24973
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity El Centro Rd. Widening 4 lanes from I-80 to Arena Blvd (City of Sacramento Limits) $ 8,500,000 Post-2040 SAC24943 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Elder Creek Rd. Widening C Widen: 4 lanes from South Watt Ave. to Excelsior Rd. $ 21,000,000 $ 25,586,461 2026-2030 SAC24380 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Elk Grove-Florin Rd. Bridge
Elk Grove-Florin Rd, over Elder Creek, 0.1 mi north of Gerber Rd.: Replace functionally obsolete 2 lane bridge and widen to 6 lanes. $ 7,810,732 2020-2025 SAC15170 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Elk Grove-Florin Rd. Widening
In Sacramento County, Elk Grove-Florin Road from North of Elder Creek to Florin Road: widen from 2 to 4 lanes. (Existing Elder Creek bridge is being replaced and widened to 6 lanes SAC24380) $ 7,516,000 2020-2025 SAC24527 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Extension
Construct New Road: 2 lanes from Airport Blvd. / Crossfield Dr. to Power Line Rd. Includes: landscaped medians. $ 8,200,000 $ 9,990,904 2026-2030 SAC15230 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Widening
In Sacramento County, Elkhorn Blvd. from Watt Ave. to Don Julio Blvd.: widen from 4 to 6 lanes. $ 14,284,000 $ 17,403,667 2026-2030
SAC24525
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Widening A Widen: 4 lanes from Lone Tree Rd. to Hwy. 99. $ 10,000,000 Post-2040 SAC24938
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Widening B Widen: 6 Lanes from Metro Air Parkway to Lone Tree Rd $ 6,400,000 Post-2040 SAC24974
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Widening C 4 lanes from Airport Blvd. / Crossfield Dr. to Lone Tree Rd $ 14,800,000 Post-2040 SAC24526
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Blvd. Widening D Widen: 6 lanes from Lone Tree Rd. to Hwy. 99. $ 110,000 Post-2040 SAC15180 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Elkhorn Boulevard Widening
In Sacramento County, Elkhorn Boulevard from Rio Linda Boulevard to SR 99:
widen from 2 to 4 lanes, including bridge over Natomas east main drain, landscaping, new RR crossing and bike/ped facilities. $ 14,000,000 $ 17,057,641 2026-2030 SAC22300
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elverta Rd. Widening A
Widen: 4 lanes from Rio Linda Blvd. to connection to north side of the Sacramento International Airport. Includes: bicycle and pedestrian facilities. $ 2,600,000 Post-2040 SAC24533
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Elverta Rd. Widening B Widen: 6 lanes from Watt Ave. to Dutch Haven Ave. $ 750,000 Post-2040 SAC19620 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Elverta Road & Dry Creek Bridge Widening
Widen Elverta Rd. from Dutch Haven Blvd. to Watt Ave. from 2 to 4 lanes.

North Channel Dry Creek Bridge, between 28th St. and Gibson Ranch Park Rd.:
replace 2 lane bridge with 6 lane bridge. $ 9,622,612 2020-2025 SAC25079 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Elverta Road Extension
In Northern Sacramento County: Extension of Elverta Road from just southeast of Sand City Drive to Don Julio Boulevard: Construct new 6 lane roadway extension with a traffic signal modification at the intersection of Elverta Road and Don Julio Boulevard and a possible realignment of Antelope Road to Elverta Road. $ 7,500,000 2020-2025

Page 58 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC19621 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Elverta Road Widening
Widen Elverta Rd. from Rio Linda Blvd. to Dutch Haven Blvd. from 2 to 4 lanes including landscaped median, ADA improvements, transit access and bike/pedestrian facilities. $ 14,797,000 $ 16,741,447 2020-2025 SAC25240
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Excelsior Rd. Widening A
Widen: 4 lanes from Hwy. 16 to Elder Creek Rd. Includes: landscaped median, bicycle and pedestrian improvements, new traffic signal, traffic signal modification(s), and ADA compliant improvements. $ 4,500,000 Post-2040 SAC24391
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Excelsior Rd. Widening B
Widen: 4 lanes from Hwy. 16 to Calvine Rd. Includes: landscaped median, bicycle and pedestrian improvements, new traffic signal(s), traffic signal modification(s), and ADA compliant improvements. $ 22,500,000 Post-2040 SAC24263 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Excelsior Road Widening
In Sacramento County: Between Kiefer Boulevard/Douglas Road Extension and Jackson Road (SR16); construct and widen to 4 lanes with raised landscaped median and curb and gutter. Improvements also include the construction of a pit pump station. $ 12,000,000 $ 15,361,015 2026-2030
SAC24799
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Fair Oaks Blvd Widening Widen 2 to 4 Lanes from Sunset Ave to Madison Ave $ 4,000,000 Post-2040 SAC25086 Programmed SAC
Sacramento
County A- Bike & Ped Fair Oaks Blvd. Bicycle and Pedestrian Mobility Project, Phase 2 Fair Oaks Boulevard between Howe Avenue and Munroe Street: Create a smart growth corridor with barrier-separated bicycle lanes, widening and/or separating sidewalks, and installing landscaping, shade trees, and street lighting. The project will also include two new traffic signals at University Avenue and Fulton Avenue and signal modifications at Sierra Boulevard to improve safety, enhance circulation for bicycle and vehicles, and provide ADA accessibility for pedestrians.(PE Only. See Fair Oaks Boulevard. Bicycle and Pedestrian Mobility Project Phase 1, SAC24749.) $ 987,002 2020-2025 SAC24748 Programmed SAC
Sacramento
County A- Bike & Ped Fair Oaks Boulevard Improvements, Phase 3 In Sacramento County and Community of Carmichael: on Fair Oaks Boulevard from 500 feet north of Marconi Avenue to 400 feet south of Landis Avenue; construct roadway and pedestrian improvements including rehabilitation of the roadway, landscaping and streetscape, medians, ADA compliant improvements, transit access, bike and pedestrian facilities, traffic signal modifications at Stanley Avenue, and a new signal at Robertson Avenue. (Emission Benefits in kg/day: 0.05 ROG, 0.04 NOx, 0.02 PM 10, 0.02 PM 2.5) $ 9,493,971 2020-2025 SAC25041 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation
FFY 2017-2023 Operating Assistance for Sacramento County Rural Transit Program
Operating assistance for rural transit services within Sacramento County.

Outside the Sacramento Urbanized Area. $ 4,760,000 2020-2025 SAC24281 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Florin Rd. Widening A
Widen: 4 lanes from Elk Grove-Florin Rd. to Vineyard Rd. Includes: a traffic signal modification at Bradshaw and a couple of new traffic signals at Hedge Ave. and Waterman Rd. $ 23,700,000 $ 38,835,210 2036-2040 SAC24282
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Florin Rd. Widening B
Widen: 4 lanes from Vineyard Rd. to Sunrise Blvd. Includes: 3 new traffic signals at the intersections of Excelsior Rd., Eagles Nest Rd. and Sunrise Blvd. $ 1,850,000 Post-2040 SAC24578
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Florin Rd. Widening C Widen: 6 lanes from Florin Perkins to Elk Grove-Florin $ 500,000 Post-2040 SAC25060 Programmed SAC
Sacramento
County A- Bike & Ped Florin Road Safety Improvements
Florin Rd between Franklin Blvd and Power Inn Rd (excluding the segment at the SR-99 interchange): Install bicycle lanes, upgrade traffic signals to accommodate bicycles at all intersections, construct ADA improvements, install roadway lighting for a segment of Florin Rd. (H8-03-016) $ 3,637,400 2020-2025 SAC25072 Programmed SAC
Sacramento
County A- Bike & Ped Folsom Boulevard Complete Street Improvements, Phase 1 In Sacramento County: On Folsom Boulevard between Mayhew Road and Bradshaw Road; Construct safe and unobstructed sidewalks, pedestrian safety lighting, functional landscaping, accessible curb ramps and pedestrian signal improvements. Existing utility poles will be relocated at the expense of the utility providers to provide space for these much needed safety improvements to encourage active modes of travel along this important corridor. $ 5,001,000 2020-2025

Page 59 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24941 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Fruitridge Rd Widen: 4 Lanes from S. Watt Ave to Bradshaw $ 6,000,000 $ 9,831,699 2036-2040 SAC24800
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Garfield Ave 4 Lanes from Cypress Ave to Winding Way $ 2,300,000 Post-2040 SAC24942
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Gerber Road Widen: 4 lanes from Vineyard Rd. to Excelsior Rd. $ 4,500,000 Post-2040 SAC24035 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Gerber Road Widening
Widen Gerber Road between Elk Grove-Florin Road and Bradshaw Road from 3 to 4 lanes. (This road is already 3 lanes (two westbound and one eastbound)from Elk Grove-Florin Road to about 1/4-mile west of Bradshaw Road.) $ 3,854,000 2020-2025
SAC19690 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Gerber Road Widening B
In Sacramento County, Gerber Road from Bradshaw Road to Vineyard Road:
widen from 2 to 4 lanes. $ 6,688,000 $ 7,202,245 2020-2025 SAC24852 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Glenborough Drive Construct New 4 lane road between Easton Valley Parkway and Folsom Blvd. $ 26,000,000 $ 27,999,156 2020-2025 SAC19090
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Greenback Lane Widening Widen Greenback Lane from Fair Oaks Blvd to Hazel Ave from 4 to 6 lanes. $ 41,716,000 Post-2040 SAC24255 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Hazel Ave - U.S. 50 to Folsom Blvd
In Sacramento County, Hazel Avenue, between Folsom Boulevard and US Highway 50: multi-modal corridor improvements, interchange improvements; widen from 4 lanes to 6 lanes of Hazel Avenue between Folsom Boulevard and US Highway 50. $ 82,563,000 2020-2025
SAC24626 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Hazel Ave Widening Phase 3
Sacramento County, Hazel Avenue, from Sunset Ave. to Madison Ave.: Widen from 4 to 6 lanes. New traffic signals at Roediger Lane and Phoenix Avenue.

Improve existing and projected traffic congestion; enhance pedestrian and bicycle mobility in the corridor, address safety concerns, and improve the aesthetics of the corridor. $ 14,649,000 2020-2025
SAC23160
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Hazel Ave. extension
Construct New Road: 4 lane limited access Rd. through Aerojet s property between Easton Valley Pkwy. and Grant Line Rd./White Rock Rd. $ 18,000,051 Post-2040 SAC24268 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Hazel Ave. Improvements
In Sacramento County and City of Rancho Cordova: Between Easton Valley Parkway and Folsom Boulevard; joint project with the City of Rancho Cordova to construct a new 6-lane expressway with special treatment. $ 15,000,000 2020-2025 SAC23080
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Hazel Avenue
In Sacramento County, Hazel Avenue from Madison to Sacramento/Placer County line: Widen from 4 to 6 lanes. $ 105,000,000 Post-2040 SAC25076 Programmed SAC
Sacramento
County A- Bike & Ped Howe Avenue Bicycle and Pedestrian Improvements In Sacramento County: On Howe Avenue from Cottage Way to El Camino Avenue, construct 0.6 miles of Class 2 bike lanes, 850 lineal feet of new sidewalk, 675 feet of separated lighted pedestrian walkway, a road diet from 4 to 2 lanes, the modification of two intersections and traffic signals for bike lanes, accessibility, bike detection, and safety enhancements. $ 2,152,000 2020-2025 SAC22290 Planned SAC
Sacramento
County A- Bike & Ped I-80 Bicycle / Pedestrian Crossing In Sacramento County, conduct studies, and environmental work for a bicycle/pedestrian crossing of I-80 west of Madison Avenue. $ 550,000 $ 816,478 2036-2040 SAC24884
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Jackson Hwy (SR 16) at Watt Ave.

Construct a new roadway grade separation interchange at the intersection of Jackson Hwy and Watt Ave. $ 25,000,000 Post-2040
SAC24940
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Jackson Hwy. (SR 16) C Widen: 4 Lanes from Grant Line Rd. to Murrieta Parkway $ 30,000,000 Post-2040 CAL15410 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Jackson Hwy. (SR 16) A Widen: 4 lanes from South Watt Ave. to Excelsior Rd. $ 100,000,000 $ 118,868,575 2026-2030

Page 60 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24287
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Jackson Hwy. (SR 16) D Widen: 6 lanes from South Watt Ave. to Excelsior Rd. $ 40,000,000 Post-2040 SAC24801
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Kenneth Avenue 4 Lanes from Madison Ave to Oak Ave $ 10,300,000 Post-2040 SAC24769 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Kiefer Blvd over Deer Creek
Kiefer Blvd over Deer Creek, 0.7 Mi NW State Rte 16. Replace the existing functionally obsolete one lane structure with a new two lane bridge. (Toll Credits for PE & CON). Toll Credits for ENG, CON $ 1,820,000 2026-2030 SAC22320
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Kiefer Blvd. A
Construct New Road: 4 lanes from Bradshaw Rd. to Sunrise Blvd. Includes:
bicycle and pedestrian facilities. $ 51,200,000 Post-2040 SAC15200 Planned SAC
Sacramento
County
C- Maintenance &
Rehabilitation Left Turn Lanes In Sacramento County, various locations, installation of left turn lanes. $ 705,000 $ 759,208 2020-2025 SAC24570
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Lone Tree Rd. Widen: 4 lanes from Meister Wy. to Elverta Rd. $ 9,125,000 Post-2040 SAC24257
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Madison Ave Widening
This project will widen Madison aver from 4 to 6 lanes between Hazel Ave and Greenback Lane in the Fair Oaks area. The project proposes to widen the roadway to accommodate two additional traffic lanes, a raised landscaped median, bicycle and pedestrian facilities, traffic signal modifications and traffic operations system upgrades, landscaping and streetscape enhancements, and soundwalls. $ 22,361,626 Post-2040
SAC16500 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Madison Avenue Widening Madison Avenue from Fair Oaks Blvd. to Hazel Ave.: Widen from 4 to 6 lanes. $ 29,037,000 2020-2025 SAC25186 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Madison Avenue Widening, Phase 1
In Sacramento County: Madison Avenue from Sunrise Boulevard to Hazel Avenue; Widen from 4 to 5 lanes between Fair Oaks Boulevard to 150' east of Kenneth Avenue. Add bifurcated sidewalks, continuous bike lanes, drainage facilities, landscaped median, rubberized asphalt overlay, traffic signal modifications, and new signal interconnect on Madison Avenue between Sunrise Boulevard and Hazel Avenue. (CMAQ funds for new sidewalks and new bike lanes only.) $ 29,047,000 2020-2025
SAC24802
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Main Avenue 4 Lanes from Madison Ave to Oak Ave $ 7,900,000 Post-2040 SAC24571
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Manzanita Ave.

Implement "Smart Growth Street" improvements from Fair Oaks Blvd. to Cypress Ave; and Streetscape improvements from Cypress Ave. to Madison Ave. $ 1,600,000 Post-2040
SAC24573 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Meister Way Construct New Road: 4 lane Rd. from Metro Air Pkwy. to Lone Tree Rd. $ 2,500,000 $ 3,046,007 2026-2030 SAC24512 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Metro Air Parkway
In Sacramento County, Metro Air Parkway from north of I-5 to Elverta Road:

Widen roadway from 2 to 4 lanes. $ 5,320,000 2020-2025

Page 61 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC18150 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Metro Air Parkway Interchange at I-5
In Sacramento County, I-5 at Metro Air Parkway near Sacramento International Airport: Construct the first phase of a five-lane partial clover Type L-9 interchange for Metro Air Parkway at Interstate 5 (I-5). Construct a three lane overcrossing facility with a median, bike lanes and a sidewalk on the west side.

Metro Air Parkway will connect on the north of the interchange and terminate south of I-5 with a cul-de-sac. South Bayou Rd will realigned to provide the r/w for partial completion of two-quadrant partial cloverleaf interchange.

Project also includes a one-lane northbound I-5 exit ramp and diagonal entrance ramp, one-lane southbound I-5 exit ramp, a two-lane southbound I-5 loop entrance ramp with auxiliary lane, street lighting, striping, signs, relocation of an existing drainage ditch on the south side of the freeway, construction of drainage improvements with the interchange, and relocation of utilities. $ 24,139,000 2020-2025
SAC24937
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Metro Air Parkway Widening B Widen: from 4 to 6 Lanes from I-5 to Elverta Rd $ 2,350,800 Post-2040 SAC24609 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Michigan Bar Rd/Cosumnes River Bridge Replacement Michigan Bar Rd, over Cosumnes River, 1.2 mi north of SR 16. Replace the existing one lane structurally deficient bridge with a new one lane bridge. (Toll credits for PE, ROW, & CON). Toll Credits for ENG, ROW, CON $ 13,783,000 2020-2025 SAC24620 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation New Hope Rd Bridge Replacement
New Hope Rd over Grizzley Slough, 0.5 mi north of San Joaquin/Sacramento County Line: replace existing structurally deficient 2-lane bridge with a new 2- lane bridge. $ 5,683,403 2020-2025
SAC24251
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Oak Ave. Widen: 4 lanes from Hazel Ave. to Folsom City Limits. $ 16,400,000 Post-2040 SAC25061 Programmed SAC
Sacramento
County A- Bike & Ped Power Inn Rd Bike & Ped Safety Improvements Power Inn Road from Elsie Avenue to about 400 feet north of Macfadden Drive: Install curb, gutter, sidewalk infill and curb ramps; widen substandard bike lanes.(H8-03-017) $ 3,505,400 2020-2025
SAC25035 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Power Inn Rd. Improvement Project
Power Inn Road, from Florin Rd. to 52nd Ave.: Widen from three to four lanes, and from 450 feet south of Loucreta Dr. to 52nd Ave.: Install curb, gutter, sidewalk infills, ADA ramps, bike lane improvements, and landscape medians. (Scope included in MTP/SCS project SAC24274. Related ATP project is SAC25022) $ 4,522,000 2020-2025
SAC25022 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Power Inn Road Sidewalk Improvements
In Sacramento County, on Power Inn Road from approximately 450 feet south of Loucreta Drive to Florin Road: Construct continuous sidewalks and bike lanes. At Florin Rd. and Power Inn Rd.: Modify intersection. $ 2,374,000 2020-2025 SAC24803
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Power Line Road A 4 Lanes from Road A to Elverta Road $ 7,200,000 Post-2040 SAC25129
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Power Line Road B 4 lanes from Elverta Road to Sutter County line $ 7,000,000 Post-2040 SAC24330 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Prairie City Road Widening
Widen Prairie City Road from 2 to 4 lanes between US 50 and White Rock Road. $ 11,000,000 $ 12,445,490 2020-2025
SAC24805
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Rio Linda Blvd Widening A 4 Lanes from Elkhorn Blvd to Elverta Rd $ 8,250,000 Post-2040 SAC24935
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Rio Linda Blvd Widening B Widen: 4 Lanes from Ascot Ave to Elkhorn Blvd $ 4,338,000 Post-2040

Page 62 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24804
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Rio Linda Blvd Widening C
(Elverta Specific Plan Mitigation)
4 Lanes from Elverta Rd to Sorento Rd $ 8,500,000 Post-2040 SAC24806
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Road A 4 Lanes from Power Line Road to Lone Tree Rd $ 4,000,000 Post-2040 SAC19680 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Roseville Rd. Widening B Widen: 4 lanes from Watt Ave. to Walerga Rd. $ 38,422,000 $ 55,646,512 2031-2035 SAC24575
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Roseville Rd. Widening C Widen: 4 lanes from Antelope Rd. to Placer County line. $ 6,750,000 Post-2040 SAC24584
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Routier Road Extension A Road Extension: 4 lanes from Old Placerville Rd. to Kiefer Blvd. $ 13,000,000 Post-2040 SAC24581
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Routier Road Extension B Road Extension: 4 lanes from Kiefer Blvd. to Jackson Rd (Rte 16) $ 15,000,000 Post-2040 SAC23860 Planned SAC
Sacramento
County
B- Road & Highway
Capacity S. Watt Ave. Widen: 6 lanes from Jackson Road (SR16) to Kiefer Blvd. $ 10,000,000 $ 12,800,845 2026-2030 SAC24259
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity S. Watt Ave. / Elk Grove-Florin Rd. Widen: 6 lanes from Jackson Rd. to Calvine Rd. $ 3,250,000 Post-2040 SAC21530 Planned SAC
Sacramento
County A- Bike & Ped Sacramento County ADA Transition Plan Facilities Plan: In Sacramento County, various locations, construct ADA compliant improvements in accordance with the county DOTs ADA Transition Plan. $ 15,000,000 $ 24,579,247 2036-2040
SAC24807
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Sorento Rd Widen: 4 Lanes from Elverta Rd to Placer County Line $ 6,000,000 Post-2040 SAC25192 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity South Watt Avenue Improvement Project, Phase 1 In Sacramento County: South Watt Avenue from Fruitridge Road to Jackson Road (State Route 16); widen from 2 to 4 lanes and install Class 2 buffered bike lanes, pedestrian walkways, raised center median and intersection upgrades. (See PE and ROW on SAC19290). Toll Credits for CON $ 9,000,000 2031-2035 SAC25193 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity South Watt Avenue Improvement Project, Phase 2 In Sacramento County: South Watt Avenue from Florin Road to Fruitridge Road; widen from 2 to 4 lanes. (See PE and ROW on SAC19290) $ 18,000,000 2031-2035 SAC19290 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity South Watt Avenue Widening
In Sacramento County: South Watt Avenue from Florin Road to Jackson Road (Route 16): widen from 2 to 4 lanes. (PE and ROW only. See SAC25192 and SAC25193 for CON phase). $ 1,980,000 2031-2035
SAC19700
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Stockton Blvd. Widen: 6 lanes from 65th Ave. to Hwy. 99. $ 23,800,000 Post-2040 SAC19710 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Sunrise Blvd. Widening A
In Sacramento County: Sunrise Blvd. between Jackson Highway and Grant Line Road; Widen from 2 to 4 lanes $ 12,000,000 2020-2025
SAC24261
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Sunrise Blvd. Widening B
From Madison Ave. to Gold Country Blvd.: Implement ITS Strategies and partial grade separation at Fair Oaks Blvd and transit enhancements $ 6,162,807 Post-2040 SAC24808
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Sunset Ave 4 Lanes from San Juan Avenue to Fair Oaks Blvd $ 6,100,000 Post-2040 SAC24522 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Twin Cities Rd Bridge Replacement
Twin Cities Rd, over Snodgrass Slough: Replace the existing 2 lane structurally deficient structure with a new 2 lane structure. $ 18,114,002 2020-2025 SAC24283
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Vineyard Rd. Construct New Road: Enhanced 2 lanes from Gerber Rd. to Jackson Hwy. $ 2,900,000 Post-2040

Page 63 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24809
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity W. 6th Street - Rio Linda 4 Lanes from Elkhorn Blvd to Elverta Rd $ 1,000,000 Post-2040 SAC24687 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Walnut Grove Bridge Rehab
In Walnut Grove, Walnut Grove crossing, over Sacramento River: Rehabilitate existing bridge. No added lane capacity. $ 2,769,375 2020-2025 SAC25130
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Waterman Road Extension
Extend Waterman Road from Gerber Road to Florin Road with an at-grade railroad crossing. $ 20,000,000 Post-2040
SAC24285 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Waterman Road Widening D
Between Vintage Park Drive and Gerber Road; widen existing roadway to 4 lanes $ 20,000,000 $ 24,368,058 2026-2030
SAC24885 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Waterman Road Widening E Between Florin Rd. to Jackson Rd.; construct roadway to 4 lanes $ 16,500,000 $ 21,121,395 2026-2030 SAC24939
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Watt Ave Widen: 6 Lanes from Antelope Rd to Placer County Line $ 327,000 Post-2040 SAC24352
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Watt Ave. Construct New Interchange: Watt Ave. / Folsom Blvd. $ 7,500,000 Post-2040 SAC25187 Programmed SAC
Sacramento
County A- Bike & Ped Watt Avenue Complete Street Improvements, Phase 1 In Sacramento County: Watt Avenue from Orange Grove Avenue to Roseville Rd.: Construct buffered bike lanes, separated sidewalks and landscape medians and improve signalized intersections. The project also extends bike lane and sidewalk improvements south from Orange Grove Avenue to I-80 westbound ramps. $ 3,800,000 2020-2025
SAC15750 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Watt Avenue Couplet
In Sacramento County, Watt Ave: Between Palm Ave. Don Julio Blvd. and Antelope Rd. Elkhorn Blvd. widen to 6 lanes; 3 lanes north bound on Watt Ave and 3 lanes southbound on 34th St; smart growth st. with proposed BRT/HI Bus - exclusive lanes. $ 7,800,000 $ 9,984,659 2026-2030 SAC15720 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Watt Avenue Widening
In Sacramento County, Watt Ave.: Between Elkhorn Blvd and Antelope Rd widen from 4 to 6 lanes $ 9,641,800 $ 14,313,306 2036-2040 SAC24662 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity White Rock Road - Grant Line Rd. to Rancho Cordova City Limits Widen White Rock Road, from Grant Line Road to Rancho Cordova easterly City limits, from 2 to 4 lanes. Environmental to be cleared as part of SAC24470. $ 10,000,000 2020-2025
SAC24389 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Widen 16th St. Widen: 4 lanes from Ascot Blvd. to Sacramento/Placer County Line. $ 44,500,000 $ 54,218,929 2026-2030 SAC24936
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Winding Way Widen: 4 Lanes from Auburn Blvd to San Juan Ave $ 1,432,500 Post-2040 SAC24619 Programmed SAC
Sacramento
County
C- Maintenance &
Rehabilitation Winding Way Bridge Replacement
Winding Way over Chicago Creek, 0.1 mi west of Chicago Ave: Replace existing functionally obsolete 2-lane bridge with a new 2-lane bridge. $ 3,763,100 2020-2025 SAC24622 Programmed SAC
Sacramento
County
B- Road & Highway
Capacity Zinfandel Drive Extension & Realignment
In Sacramento County: Zinfandel Drive, from Douglas Rd. to 7,100 ft south of Douglas Rd.: reconstruct Zinfandel Drive as a two lane road. From 7,100 ft south of Douglas Rd. to Kiefer Blvd.: extend Zinfandel Dr. as a two lane road on a slightly different alignment than the existing dirt road. Construct concrete box culvert over creek just north of Kiefer Blvd. $ 5,848,000 2020-2025 SAC22430 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Zinfandel Drive Widening A
In Sacramento County, Eagles Nest Road Zinfandel Drive from Kiefer Boulevard to Douglas Road, construct and widen from 2 to 4 lanes with curb, gutter, sidewalk, raised landscaped median; improvements also include the installation of a box culvert and traffic signal at Eagles Nest Road/Kiefer Boulevard. $ 11,800,000 $ 14,377,154 2026-2030
SAC24975
Project
Development Only SAC
Sacramento
County
B- Road & Highway
Capacity Zinfandel Drive Widening B
In Sacramento County, Zinfandel Drive from Jackson Road (State Route 16) to Kiefer Boulevard, construct and widen from 2 to 4 lanes with curb, gutter, sidewalk, raised landscaped median and traffic signal modification at Jackson Road (State Route 16). $ 4,800,000 Post-2040

Page 64 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC20240 Planned SAC
Sacramento
County
B- Road & Highway
Capacity Zinfandel Road Widening
Zinfandel Drive, from Southern boundary of the Villages of Zinfandel to Douglas Road: Widen from 2 to 4 lanes with a raised landscaped median. (For other phases see SAC24473 and SAC24467) $ 10,500,000 $ 11,307,352 2020-2025 SAC24222 Planned SAC
Sacramento
County and City of
Rancho Cordova
D- Programs &
Planning
Jackson Hwy. (SR 16) from Excelsior to Grant Line Road: Project Development and Operational Improvements
Complete project analysis efforts, as needed, to identify and implement operational improvements to improve safety and traffic flow along the corridor in the near-term. Improvements to study may include intersection improvements, access management strategies, and traffic signalization enhancements that benefit travel for automobiles and commercial vehicles.

The project listing also allows other project development activities to advance so the corridor segment can eventually become a four lane facility in a manner that is consistent with the City and County's design guidelines. Rancho Cordova would contribute to portions of work between Sunrise and Grant Line within the city's limits. $ 6,235,000 $ 10,216,774 2036-2040 SAC25242 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) 2800 Series 40' CNG Bus Replacement (FY20-FY22) 2800 Series 40' CNG Bus Replacement (FY20-FY22) $ 70,920,000 $ 74,510,325 2020-2025 SAC24869 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Automatic Passenger Counters
Purchase and install Automatic Passenger Counters (APC) on SacRT's light rail vehicles. $ 500,000 $ 819,308 2036-2040
SAC25154
Project
Development Only SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Blue Line Light Rail Extension to Elk Grove Extension of Blue Line from Cosumnes River College station to Elk Grove. $ 690,000,000 Post-2040 REG18037 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) BMF1 CNG Facility Equipment Replacement
At RT’s Bus Maintenance Facility #1 (BMF1): Replace and upgrade aging compressor equipment, the flow devices for the CNG dispensers, the HMI fueling control monitors and the control systems. $ 1,824,450 2020-2025 SAC25243 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Bus Fleet Replacement (FY23-FY35) Bus Fleet Replacement (FY23-FY35) $ 180,087,000 $ 260,819,672 2031-2035 SAC24874 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Bus Maintenance Facility #1 Rehabilitation Rehabilitate the District's existing Bus Maintenance Facility. $ 10,000,000 $ 16,386,164 2036-2040 SAC25147 Planned SAC
Sacramento
Regional Transit
District
F- Transit O&M (Light
Rail) CAF Fleet Mid-Life Component Overhaul Overhaul major subsystems/components on the CAF fleet (40 vehicles) $ 120,000,000 $ 196,633,973 2036-2040 SAC25119 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) CAF Series Fleet Replacement (40) CAF Series Fleet Replacement (40) $ 228,000,000 $ 373,604,548 2036-2040 REG18031 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor)
Center for Public Interest Design (CPID) Study, station conversion concepts
Design station conversion concepts to accommodate future low-floor vehicles.

First phase of study is the Center for Public Interest Design (CPID) initial study. (Toll credits for the $350K RSTP for CPID initial study.). Toll Credits for CON $ 350,000 2020-2025 SAC25117 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Circulator Bus/Microtransit Expansion Vehicles Circulator Bus/Microtransit Expansion Vehicles $ 9,885,353 $ 16,198,302 2036-2040 SAC25121 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) CNG Bus Expansion CNG Bus Expansion $ 221,179,000 $ 362,427,546 2036-2040 REG18023 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Dos Rios Light Rail Station
On Blue Line light rail, on the east side of 12th St., south of Richards Blvd.:
build new light rail station. The station is part of the redevelopment of Twin Rivers public housing development. (Emission Benefits in kg/day: 1.02 ROG,

0.97 NOx, 0.58 PM10) $ 21,732,000 2020-2025
SAC25238 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Electric Bus Charging Infrastructure
Add new electric bus charging infrastructure to be used to charge both fixed route and microtransit zero emission vehicles. $ 7,000,000 $ 11,470,315 2036-2040

Page 65 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
REG18042 Programmed SAC
Sacramento
Regional Transit
District
F- Transit O&M
(General) Enhanced Employee Protection Warning System
This project will first deploy an Enhanced Employee Protection Warning System (EEPWS) that will alert both the train operator of an upcoming work zone and the workers in that zone of the approaching train. This system consists of two elements. The first element is vehicle mounted equipment; the second component is a wearable warning device used by track workers. It will also develop and demonstrate a state of the art dispatcher work crew/lone worker software system. $ 1,103,400 2020-2025
SAC25239 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) General Facilities Maintenance and Improvements General maintenance of facilities throughtou the district, including LR maintenance faciliites, Bus maintenance facilities, administrative buidlings, Customer Service building, etc. $ 3,625,000 $ 5,939,985 2036-2040 SAC25152 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Gold Line Frequency and Service Enhancements
Modifications and enhancements to the Gold Line to enable more frequent service and/or limited stop express service between Folsom and downtown Sacramento including 10 Expansioin LRVs, Side Track, Signal and Crossing Upgrades, LR facility and yard expansions. $ 194,800,000 $ 319,202,483 2036-2040 REG17943 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Green Line (DNA) Light Rail - Planning
This project will redefine a Minimum Operable Segment (MOS) 2 and a MOS 3.

REG17935 includes the Final Design and Construction for the project (excluding MOS-1).This phase of the Green Line to the Airport (DNA) Light Rail Project will consist of two discreet, yet connected efforts. For the segment of the Green Line near and adjacent to the Sacramento Intermodal Transfer Center (SITF), the effort will entail the preparation of Draft EIS (and EIR), its circulation for public review and comment, addressing the comments and will culminate with a Final EIS (and EIR). The segment of the project adjacent to the SITF will be coordinated with on-going Sacramento Streetcar planning, environmental review, and design development. For the remainder of the 13- mile corridor, the effort will entail the preparation of a Draft EIS (and EIR) only and its circulation for public review and comments. An MOS will also be identified for this segment. The effort will also evaluate low-floor LRT vehicles and their integration into the RT system, evaluate LRT vehicle maintenance locations for the Green Line, evaluate downtown Sacramento rail/traffic effects of the proposed service, prepare the necessary technical information and for a New Starts evaluation under MAP-21, and involve the community and stakeholders in an outreach program for both efforts. Advanced conceptual engineering and preliminary engineering in key areas with potential for environmental impacts that may require mitigation strategies for the EIS will be completed. $ 14,310,336 2020-2025
SAC25235 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major)
Green Line: MOS2 Township 9 to North Natomas Town Center (CON) Extend rail from Township 9 to North Natomas Town Center $ 390,000,000 $ 499,232,972 2026-2030 SAC25236
Project
Development Only SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major)
Green Line: MOS3 North Natomas Town Center to Airport
(CON) Extend rail from North Natomas Town Center to Airport $ 700,000,000 Post-2040 SAC25148 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Hi-Bus Expansion Vehicles Hi Bus Vehicles for five BRT lines and 20 Enhanced Bus Lines $ 168,877,000 $ 276,724,629 2036-2040 SAC25151 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Hi-Bus Infrastructure Hi Bus Infrastructure for five BRT lines and 20 Enhanced Bus Lines $ 368,317,000 $ 603,530,291 2036-2040 REG18024 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Horn Light Rail Station
On the Gold Line, between Butterfield and Mather/Mills stations, at Horn Rd. and Old Winery Pl, construct new light rail station. (Emission Benefits in kg/day: 0.27 ROG, 0.26 NOx, 0.15 PM10) $ 4,600,000 2020-2025

Page 66 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC25149 Planned SAC
Sacramento
Regional Transit
District
G- System
Management,
Operations, and ITS InformationTechnology Enhancements
Various Information Technology (IT) enhancement projects including transit ops & maintenance software; Connect Card technology; computer, network and telephone upgrades; etc. $ 3,965,399 $ 6,497,768 2036-2040 REG17999 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Light Rail Crossing Enhancements
Transit Capital/Operations: Purchase and install, as needed, a variety of components in the grade crossing mechanisms. $ 3,500,000 $ 5,735,158 2036-2040 SAC25237 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Light Rail Low Floor Station Conversions - Blue & Green Lines For the 19 light rail stations along the Blue and Green Lines that are not already low-floor compatibble, design and construct improvements to convert stations to accommodate future low-floor vehicles. $ 36,150,000 $ 59,235,984 2036-2040 REG18048 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Light Rail Low Floor Station Conversions - Gold Line For the 29 light rail stations along the Gold Line, design and construct improvements to convert stations to accommodate future low-floor vehicles. $ 50,100,000 2026-2030 REG17966 Planned SAC
Sacramento
Regional Transit
District A- Bike & Ped Light Rail Station Pedestrian Improvements Pedestrian Improvements: At the Fruitridge, Cosumnes River College, and City College light rail stations, improve pedestrian access. $ 11,950,000 $ 19,581,466 2036-2040 REG18008 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Light Rail Station Shelter Improvement Program Passenger Amenities: Add and improve light rail station shelters. $ 2,581,436 $ 4,229,983 2036-2040 SAC24783 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Metro Light Rail Yard Expansion
Modify, reconfigure and expand the Metro light rail yard (or other terminal yards). Add storage yard tracks at Academy Way site $ 13,700,000 $ 22,449,045 2036-2040 SAC24881 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Neighborhood Ride Vehicle Replacement Neighborhood Ride Vehicle Replacement $ 4,400,000 $ 7,209,912 2036-2040 SAC24864 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) New Light Rail Stations
Project is to build stations previously deferred during construction of the light rail system: such as T St, Mineshaft or others. $ 9,025,000 $ 14,788,513 2036-2040 REG17959 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Noise Attenuation Soundwalls
Transit Capital/Operations: construct soundwalls at various locations along the light rail system. $ 4,290,000 $ 7,029,665 2036-2040
REG16470 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) Northeast Corridor Enhancements
Double track existing single track sections and improve alignment of Northeast Corridor LRT, upgrade the traction power system and signaling to provide limited-stop service, make enhancements to yard track and maintenance facility, and installation of communications infrastructure. (Local Agency Funds are from selling a parcel of land.) $ 40,000,000 2020-2025 SAC25123 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Paratransit Vehicle Expansion Paratransit Vehicle Expansion $ 27,057,661 $ 44,337,128 2036-2040 SAC25122 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement A Paratransit Vehicle Replacement A $ 81,543,153 $ 133,617,951 2036-2040 REG18010 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement FY10/11 to FY13/14 Purchase replacement and some expansion vehicles and communication equipment to be used by Paratransit, Inc to provide complementary ADA paratransit service on behalf of RT. $ 7,297,205 2020-2025 REG18035 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Rail Yards Boulevard Station
In Sacramento, on the Green Line, at Rail Yards Boulevard: Design and construct light rail station . (Environmental covered by REG17943.) $ 2,367,200 2020-2025 REG18033 Programmed SAC
Sacramento
Regional Transit
District F- Transit O&M (Bus) RT ADA Operations
ADA operations for transit services within the RT District Paratransit Area.

Sacramento Urbanized Area.FFY2017: $3,840,489FFY2018: $5,190,489 ($3,840,489 pgm'd in FFY18; $1,350,000 pgm'd in FFY19)FFY2019:
$5,190,489FFY2020: $3,840,489 $ 32,178,666 2020-2025

Page 67 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
REG18034 Programmed SAC
Sacramento
Regional Transit
District F- Transit O&M (Bus) RT Preventive Maintenance Provide for operating expenses for scheduled and unscheduled maintenance for bus and light rail revenue vehicles, facility maintenance, rail repair, and infrastructure replacement to maintain a state of good repair and prevent impacts to operations.FFY2017: $15,361,980FFY2018: $15,531,265 ($15,190,363 pgm'd in FFY18; $340,902 pgm'd in FFY19)FFY2019:
$15,776,120FFY2020: $15,601,180FTA 5337FFY2017: $11,580,302FFY2018:
$13,804,359 ($11,580,302 pgm'd in FFY18; $2,224,057 pgm'd in FFY19)FFY2019: $13,064,129FFY2020: $11,810,979 $ 209,409,156 2020-2025 SAC25116 Planned SAC
Sacramento
Regional Transit
District
D- Programs &
Planning SacRT Plans and Studies
SacRT Plans and Studies including Long Range Plan Update, TOD-Related Professional Services, and Miscellaneous Planning/Studies $ 1,450,000 $ 2,375,994 2036-2040 SAC24871 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Shop Equipment - Bus Purchase a variety of equipment as needed for vehicle and shop maintenance. $ 307,739 $ 504,266 2036-2040 SAC25120 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Siemens 2nd Series Fleet Replacement Siemens 2nd Series Fleet Replacement $ 65,100,000 $ 106,673,930 2036-2040 REG18032 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) Siemens Light Rail Vehicle (LRV) Replacement Purchase 6 replacement and 7 expansion light rail vehicles. (CMAQ funds are eligible for design and construction to expand the fleet. Emission Benefits in kg/day: 2 ROG, 1 NOx, 1 PM2.5) $ 78,579,987 2026-2030
REG17300 Programmed SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) SRTD Satellite Bus Maintenance Facility #2 Phase 1 In Sacramento: Acquire land and construct a new bus maintenance facility in McClellan Park. Plans for this facility include two fueling stations, one land bus wash, and a revenue collection center. Also includes site work for parking and building modifications to support 125 buses. A Phase 2 will follow. $ 81,010,860 2026-2030 SAC25150 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Major) State of Good Repair - Transit Infrastructure
Various projects to maintain the state of good repair of SacRT's light rail system $ 47,565,273 $ 77,941,238 2036-2040
REG17979 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Minor) Transit Station and Stop Enhancements
Light Rail Station and Stop Enhancements (Ped/Bike Access, Lighting, Wayfinding, Shelters, etc.) $ 25,000,000 $ 40,965,411 2036-2040 SAC25124 Planned SAC
Sacramento
Regional Transit
District
E- Transit Capital
(Vehicles) UTDC Fleet Replacement UTDC Fleet Replacement $ 119,700,000 $ 196,142,388 2036-2040 CAL21337 Planned SAC
San Joaquin
Regional Rail
Commission
E- Transit Capital
(Major) Valley Rail Program – Phase 1
On the UPRR Sacramento Subdivision approximately 39.5 miles from Natomas (W. Elkhorn Blvd.) to San Joaquin County Line: Construct track improvements and additional track, upgrade existing track, construct new stations, and required signaling and layover/maintenance facility. Project improvements will enable two San Joaquins round trips and up to five Altamont Corridor Express (ACE) round trips between Sacramento and the San Joaquin Valley (with one ACE round trip also to the Bay Area). Project includes new equipment for expanded San Joaquins and ACE services and funding for operations to extend ACE to Sacramento. $ 425,582,000 $ 697,365,662 2036-2040 VAR56006 Programmed SAC SMAQMD
D- Programs &
Planning Spare the Air Phase 2
Sacramento Federal Non-attainment Area: Spare The Air Voluntary Driving Curtailment Program. [Continued from SAC21080, Larger MTP project is VAR56022] (Emission Benefits in kg/day: ROG 0.2, NOx 0.2) $ 8,807,521 2020-2025 SAC25080 Programmed SAC
Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector - D3
In Folsom: Between Prairie City Rd and Carson Crossing Rd; Construct 4 lane (Expressway). (To be constructed with Capital SouthEast Connector E1, ELD19468). $ 44,000,000 2026-2030
SAC25244 Planned Sac
City of
Sacramento
G- System
Management,
Operations, and ITS Stockon Blvd Moblity Project
Improve safety, transit, and moblity on Stockton Blvd from Alhambra to 47th Street. Reduce number of lanes from four to two to accommodate BRT or Bike/Ped $ 100,000,000 $ 115,969,342 2026-2030

Page 68 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20934 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation
In and near Yuba City on SR 20 from Sycamore Canal to the Yuba Co Line (PM 12.13/17.06) and on SR 99 from south of Franklin Road to Queens Ave OC (PM 29.67/31.31). ADA
Improvements. (EA 2F090)
In and near Yuba City on SR 20 from Sycamore Canal to the Yuba Co Line (PM

12.13/17.06) and on SR 99 from south of Franklin Road to Queens Ave OC (PM

29.67/31.31). ADA Improvements. EA 2F090 $ 4,500,000 $ 5,760,380 2026-2030 CAL21014 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
In Sut & Yub Co, on Rte 20, 70 & 99; Sut 20 PM 12/16.7, Sut 99 PM 26/R31.7, Yub 20 PM 0/0.2, Yub 70 PM 14/15.5. Upgrade traffic signals, install video detection and CCTV, transit vehicle & adaptive signal control, and ADA improvements.

In Sut & Yub Co, on Rte 20, 70 & 99; Sut 20 PM 12/16.7, Sut 99 PM 26/R31.7, Yub 20 PM 0/0.2, Yub 70 PM 14/15.5. Upgrade traffic signals, install video detection and CCTV, transit vehicle & adaptive signal control, and ADA improvements. SHOPP ID 18449 $ 9,100,000 $ 11,648,769 2026-2030 CAL20865 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation
In Sutter County from 0.6 mile north of Jct Rte 70 to Marcuse Rd. CAPM.

In Sutter County from 0.6 mile north of Jct Rte 70 to Marcuse Rd (PM

8.7/16.2): CAPM. SHOPP ID 20533 $ 6,240,000 $ 7,264,480 2026-2030 CAL15780 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS SR 20 / SR 99 Interchange ROW Acquisition ROW Acquisition: for urban interchange at existing SR 20 / SR 99 intersection $ 30,507,000 $ 49,989,272 2036-2040 CAL15770 Planned SUT Caltrans D3
B- Road & Highway
Capacity SR 20 Improvements Widen: SR 20 to six (6) lanes from Walton Rd. to Rocca Wy. $ 2,000,000 $ 3,277,233 2036-2040 CAL21042 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 20 Pavement Rehabilitation A In Sutter County on Route 20 from S. Butte Rd to the county line. $ 6,900,000 $ 8,201,932 2026-2030 CAL21048 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 70 Pavement Rehabilitation B
In Sutter County on Route 70 from Jct 70/99 to end of county (PM R0.0/8.3):

Pavement rehab. SHOPP ID 20540 $ 5,675,000 $ 6,745,792 2026-2030 CAL20569 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Class II Bike Lane On SR 99, construct bike lane from Bogue Road to SR 20 Jct. $ 1,440,000 $ 2,359,608 2036-2040 CAL20731 Programmed SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 City of Live Oak Safety Improvements In the City of Live Oak, on State Route 99, at the intersection of Elm Street and Pennington Road: Intersection safety improvements (PM 40.0/40.5) [CTIPS ID 107-0000-1067] (Toll Credits for PE, ROW and CON). Toll Credits for ENG, ROW, CON $ 6,310,000 2020-2025
CAL20888 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Diagonal Ramp Meter at the SR 99/Howsley Road
interchange
In Sutter County at SR 99/Howsley Road Interchange a Diagonal ramp meter.

Future Configuration is 1+1. (Howsley Road to SB SR 99) (PM 5.401) $ 900,000 $ 1,474,755 2036-2040 CAL20885 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Diagonal Ramp Meter at the SR 99/Riego Road
interchange (EB)
In Sutter County at SR 99/Riego Road Interchange Repair a Diagonal ramp meter. Future Configuration is 2+1. (EB Riego Road to SB SR 99) (PM 1.015) $ 1,120,000 $ 1,835,250 2036-2040 CAL21087 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Diagonal Ramp Meter at the SR 99/Riego Road
interchange (WB)
In Sutter County at NB SR 99/Riego Road Interchange a Diagonal ramp meter.

Future Configuration is 2+1. (WB Riego Road to NB SR 99) (PM 0.895) $ 1,120,000 $ 1,835,250 2036-2040 CAL21066 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Drainage Improvements C
In Sutter County on Route 99 at the Howsley Rd UC (Pump Plant #18-0045W):

Upgrade pump plant. SHOPP ID 20780 $ 3,675,000 $ 886,693 2026-2030 CAL20872 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Drainage Improvements D In Sutter County at Queens Ave OC, Pump Plant #18-34W. SHOPP ID 20577 $ 2,975,000 $ 659,400 2026-2030 CAL20763 Programmed SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Live Oak Rehab
In Live Oak, on SR 99, from 0.1 mile north of Coleman Avenue to 0.2 mile north of Ramsdell Drive (PM 39.4/41.0) - Roadway rehabilitation [CTIPS ID 107-0000- 1105] (Toll Credits). Toll Credits for ENG, ROW, CON $ 30,765,000 2020-2025 CAL20429 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Lomo Railroad Crossing
In Sutter County on Route 99 from approx 0.1 mile sout of Encinal Road to approx 0.2 mile north of Kent Ave (PM T35.8/36.5): Safety improvements. EA 0J910 $ 8,320,000 $ 19,996,036 2036-2040
CAL21088 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Loop Ramp Meter at the SR 99/Riego Road interchange (EB)
In Sutter County at NB SR 99/Riego Road Interchange a Loop ramp meter.

Future Configuration is 2+1. (EB Riego Road to NB SR 99) (PM 1.169) $ 1,120,000 $ 1,835,250 2036-2040 CAL21085 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Loop Ramp Meter at the SR 99/Riego Road interchange (WB)
In Sutter County at SR 99/Riego Road Interchange Repair a Loop ramp meter.

Future Configuration is 1+1. (WB Riego Road to SB SR 99) (PM 0.79) $ 900,000 $ 1,474,755 2036-2040 CAL20767 Programmed SUT Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Mitigation Banking
In Glenn, Colusa, Sutter, Yuba, Placer, Yolo & Sac Counties at various locations.

Advanced mitigation banking credits. $ 1,510,000 2020-2025

Page 69 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20607 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Passing Lanes Passing Lanes: Yuba City to Butte County Line. $ 24,406,000 $ 39,992,073 2036-2040 CAL21041 Planned SUT Caltrans D3
C- Maintenance &
Rehabilitation SR 99 Pavement Rehabilitation C
In Sutter County on Route 99 approx 0.1 mile south of Messick Road to Jct of Rte 20. (PM 24.1/30.6) SHOPP ID 20447 $ 10,850,000 $ 6,306,758 2026-2030 CAL20887 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS SR 99 Ramp Meter at the SR 99/Sankey Road In Sutter County at SB SR 99/Sankey Road ramp meter. (PM 3.04) $ 380,000 $ 622,674 2036-2040 CAL21296 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Ramp Meter at the SR 99/Sutter Bay Blvd. Road
interchange (EB to NB)
In Sutter County at SR 99/Sutter Bay Blvd. Road Interchange ramp meter.

Future Configuration is 1+1. (EB Sutter Bay Blvd. to NB SR 99) $ 900,000 $ 1,474,755 2036-2040 CAL21297 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Ramp Meter at the SR 99/Sutter Bay Blvd. Road
interchange (EB to SB)
In Sutter County at SR 99/Sutter Bay Blvd. Road Interchange ramp meter. (EB Sutter Bay Blvd. to SB SR 99) $ 380,000 $ 622,674 2036-2040 CAL21295 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Ramp Meter at the SR 99/Sutter Bay Blvd. Road
interchange (WB to NB)
In Sutter County at SR 99/Sutter Bay Blvd. Road Interchange ramp meter. (WB Sutter Bay Blvd. to NB SR 99) $ 380,000 $ 622,674 2036-2040 CAL21298 Planned SUT Caltrans D3
G- System
Management,
Operations, and ITS
SR 99 Ramp Meter at the SR 99/Sutter Bay Blvd. Road
interchange (WB to SB)
In Sutter County at SR 99/Sutter Bay Blvd. Road Interchange ramp meter. (WB Sutter Bay Blvd. to SB SR 99) $ 380,000 $ 622,674 2036-2040 CAL20522 Programmed SUT Caltrans D3
C- Maintenance &
Rehabilitation Sutter Bypass Rehab and Widening
Near Yuba City on SR 20, from east end of Sutter Bypass to Lytle Road - Rehabilitate roadway, widen shoulders and replace Wadsworth Canal Bridge #18-0003 (PM 5.0/11.3) [EFIS ID 0300020608; CTIPS ID 107-0000-0968] (Toll Credits for PE, ROW, CON). Toll Credits for ENG, ROW, CON $ 31,356,000 2020-2025 SUT18914 Planned SUT City of Live Oak
B- Road & Highway
Capacity Apricot St. Extension
Construct New Road: 2 lane collector from Samuel St. to Richard Ave. Includes:
drainage, curb, gutter, sidewalk, and bike lanes. $ 1,716,000 $ 1,941,496 2020-2025 SUT17011 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Apricot St. Rehab
Pavement Rehabilitation: in Live Oak from N St. to Samuel St. Includes:
resurface existing pavement. $ 360,000 $ 397,373 2020-2025 SUT17009 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Archer Ave. Phase 2
Pavement Rehabilitation: from L St. to K St. Includes: curb, gutter, sidewalks, and drainage improvements. (Phase II) $ 486,000 $ 549,864 2020-2025 SUT17025 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Archer Ave. Phase 3
Pavement Rehabilitation: from K St. to City Limit. Includes: curb, gutter, sidewalks, and drainage improvements. (Phase III) $ 480,000 $ 556,653 2026-2030 SUT18915 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Bishop Ave.

Road Reconstruction: from SR 99 to Planning Area Limits Includes drainage, curb, gutter, sidewalk, and bike lanes. $ 1,047,000 $ 1,340,249 2026-2030 SUT18916 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Broadway St. and Elm St.

Road Reconstruction from Apricot St. to the Elm St./SR 99 intersection.

Includes: drainage improvements, curb, gutter and sidewalk and bike lanes $ 650,000 $ 753,801 2026-2030 SUT17007 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Broadway St. Reconstruction
Road Reconstruction: from Pennington Rd. to Elm St. Includes: sidewalk, bike lanes, drainage improvements. $ 810,000 $ 939,352 2026-2030 LiveOak2 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation California St.

Road Reconstruction: from Pennington Rd. to Elm St. Includes: sidewalk, bike lanes, drainage improvements. $ 900,000 $ 1,096,563 2026-2030 SUT17023 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Center St.

Pavement Rehabilitation: from Pennington Rd. to Elm St. Includes: drainage improvements. $ 800,000 $ 927,755 2026-2030
SUT18907 Planned SUT City of Live Oak A- Bike & Ped Class I Bikeways Construct New Class I Bikeways off-street and along various new and existing City streets $ 3,405,000 $ 4,931,455 2031-2035
SUT18918 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Coleman Rd. Reconstruction and Bike Lanes Road Reconstruction: from SR 99 to Sinnard Ave. Includes drainage, curb, gutter, sidewalk, and bike lanes. $ 2,110,000 $ 3,055,909 2031-2035 LiveOak1 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Coleman Rd. Reconstruction and Realignment Road Reconstruction: from Larkin Rd. to SR 99. Includes realignment of Coleman Rd., new at-grade crossing of UPRR, drainage, curb, gutter, sidewalk, and bike lanes. $ 6,515,000 $ 10,675,586 2036-2040
SUT17020 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Elm St.

Road Reconstruction: from Broadway to N St. Includes: curb, gutter, sidewalks, bike lanes, and drainage improvements. $ 567,000 $ 690,834 2026-2030 SUT17024 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Elm Street Reconstruction
In Live Oak: Elm Street from Larkin Road to L Street; reconstruct, install curb, gutter, sidewalks, drainage improvements. $ 580,000 $ 742,449 2026-2030 SUT17021 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Fir St.

Road Reconstruction: from Broadway to N Street. Includes: curb and gutter, and new sidewalk from California St. to N Street. $ 486,000 $ 592,144 2026-2030

Page 70 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SUT17022 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Gum St.

Road Reconstruction: from Broadway to N St. Includes: curb, gutter, sidewalks, and drainage improvements. $ 425,000 $ 517,821 2026-2030 SUT17018 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Ivy St.

Road Reconstruction: from Hwy. 99 to Larkin Rd. Includes: curb, gutter, sidewalks, and drainage improvements. $ 480,000 $ 629,802 2031-2035 SUT17001 Planned SUT City of Live Oak A- Bike & Ped Kola Street Sidewalks In Live Oak; Kola Street from State Route 99 to Larkin Road; reconstruct street, install curb, gutters, sidewalks, drainage improvements, new cross walk striping and pedestrian crossing warning lights. $ 800,000 $ 999,090 2026-2030 SUT17005 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation L Street Reconstruction A
In Live Oak: L Street from Pennington Road to Elm Street, reconstruct, install curb, gutter, sidewalks, drainage improvements. $ 770,000 $ 985,665 2026-2030 SUT18921 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation L Street Reconstruction B
In Live Oak: L Street from Elm St. to Ash Street, reconstruct, install curb, gutter, sidewalks, drainage improvements. $ 1,013,000 $ 1,362,372 2031-2035 SUT18922 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Larkin Road and Elm Street
In Live Oak on Larkin Road from Archer Ave. to the Elm St./SR 99 intersection. reconstruct road and install drainage, curb and gutter, sidewalk, and bike lanes. $ 581,000 $ 707,892 2026-2030
SUT18882 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Larkin Road Reconstruction A
In Live Oak on Larkin Road from Apricot St. to current City Limit. reconstruct road and install drainage, curb and gutter, sidewalk, and bike lanes. $ 2,450,000 $ 3,059,714 2026-2030 SUT16984 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Larkin Road Reconstruction B
In Live Oak on Larkin Road from Nevada Street to Riviera Road reconstruct road and install drainage, curb and gutter, sidewalk, and bike lanes. $ 9,350,000 $ 13,211,305 2031-2035 SUT18880 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Larkin Road Reconstruction C
In Live Oak on Larkin Road from current City Limit to Paseo Ave. reconstruct road and install drainage, curb and gutter, sidewalk, and bike lanes. $ 4,510,000 $ 7,209,912 2036-2040 SUT18865 Programmed SUT City of Live Oak
B- Road & Highway
Capacity Live Oak Collaborative Highway 99 Streetscape Improvements In Live Oak, SR 99, from Ash Street to Ramsdell Drive: widen from 2 to 4 lanes and build streetscape improvements. (Toll credits for PE, ROW, and CON) (See project phases in MTP: SUT18872, SUT17014, SUT18865, SUT18906, SUT17013, SUT17015, and SUT17016.). Toll Credits for ENG, ROW, CON $ 22,090,938 2020-2025 SUT18917 Planned SUT City of Live Oak A- Bike & Ped Live Oak Community Trail Construct New Class I Bikeway along the abandon Sacramento Northern Railroad right-of-way from Elm St. to the Pennington Rd./O St. Intx. (Phase 2) $ 885,000 $ 953,048 2020-2025 SUT16987 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Luther Rd.

Road Reconstruction: from the current existing city boundary to Riviera Rd.

Includes: drainage, curb and gutter, sidewalk, and bike lanes. $ 5,887,000 $ 8,526,131 2031-2035 SUT18884
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity N St.

Construct New Road: 2 lane collector from current City Limit to Paseo Ave.

Includes: drainage, curb, gutter, sidewalk, and bike lanes. $ 6,786,000 Post-2040 SUT18883 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation N St. Reconstruction A
Road Reconstruction: from Pennington Road to Elm St. Includes drainage, curb and gutter, sidewalk, and bike lanes. $ 935,000 $ 1,084,313 2026-2030 SUT17017 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation N St. Reconstruction B
Road Reconstruction: from Kola St. to Epperson Way. Includes: curb, gutters, sidewalks, drainage improvements, and bike lanes. $ 1,256,000 $ 1,530,314 2026-2030 SUT18885 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation N St. Reconstruction C
Road Reconstruction: from Fir St. to Apricot St. Includes drainage, curb and gutter, sidewalk, and bike lanes. $ 1,418,000 $ 1,815,160 2026-2030 SUT17019 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Nevada St.

Road Reconstruction: from Hwy. 99 to Larkin Rd. Includes: curb, gutter, sidewalk, and drainage improvements. $ 600,000 $ 787,252 2031-2035 SUT18890 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation P St. Reconstruction A
Road Reconstruction: from Pennington Road to Apricot St. Includes drainage, curb and gutter, sidewalk, and bike lanes. $ 1,870,000 $ 2,514,942 2031-2035 SUT18889 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation P St. Reconstruction B
Road Reconstruction: from Park St. to Pennington Road Includes drainage, curb and gutter, sidewalk, and bike lanes. $ 567,000 $ 801,156 2031-2035 SUT18891 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Paseo Ave.

Reconstruct roadway from Hwy. 99 to Township Road, realign west 0.5 mi.

Includes: drainage improvements, curb, gutter, sidewalk, and bike lanes. $ 11,150,000 $ 18,270,573 2036-2040 SUT17012 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Pennington Rd. Reconstruction A
Road Reconstruction from Hwy. 99 to Larkin Rd. Includes: curb and gutter, sidewalk, drainage improvements, bike lanes and underground utilities. $ 500,000 $ 594,343 2026-2030

Page 71 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SUT18892 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Pennington Rd. Reconstruction B
Road Reconstruction from Orchard Way to Sinnard Ave. Includes: curb and gutter, sidewalk, drainage improvements, bike lanes and underground utilities. $ 1,800,000 $ 2,193,125 2026-2030 SUT17004
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity Pennington Rd. Reconstruction C
Widen and Reconstruct: add 2 traffic lanes from Hwy. 99 to N Street. Includes:
center median with turn pockets, drainage improvements, bike lanes, and underground utilities. $ 1,500,000 Post-2040
SUT17010 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Pennington Rd. Reconstruction D
Road Reconstruction from Connecticut Ave. to Luther Rd. Includes: drainage, curb and gutter, sidewalk, and bike lanes. $ 1,370,000 $ 1,935,774 2031-2035 SUT16997 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Pennington Rd. Reconstruction E
Road Reconstruction: from Sinnard Ave. to Sheldon Ave. Includes: drainage, curb, gutter, sidewalk, and bike lanes. $ 1,079,000 $ 1,641,826 2036-2040 SUT16985 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Pennington Rd. Reconstruction F
Road Reconstruction: from Township Rd. to Luther Rd. Includes: drainage, curb and gutter, sidewalk, and bike lanes. $ 3,973,000 $ 6,196,524 2036-2040 SUT16990 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Riviera Rd.

Road Reconstruction: from Township Rd. to Larkin Rd. Includes: drainage, curb and gutter, sidewalk, and bike lanes. (Phase II) $ 7,332,000 $ 12,014,336 2036-2040 SUT16983 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Riviera Road
In Live Oak, Riviera Road from SR99 to Larkin Road reconstruct road and install drainage, curb and gutter, sidewalk, and bike lanes. $ 4,518,000 $ 6,543,411 2031-2035 SUT18898
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity Road 9
Construct New Road: 2 lane collector from Richard Ave. to Linda St. Includes:
drainage, curb, gutter, sidewalk, and bike lanes. $ 2,808,000 Post-2040 SUT18900 Planned SUT City of Live Oak
B- Road & Highway
Capacity Road E
Construct New Road: 2 lane collector from SR 99 to Riviera Rd. Includes:
drainage, curb, gutter, sidewalk, and bike lanes. $ 3,822,000 $ 6,262,792 2036-2040 SUT18902 Planned SUT City of Live Oak
B- Road & Highway
Capacity Sean Drive
Construct New Road: 2 lane collector from Luther Rd. to Road C. Includes:
drainage, curb, gutter, sidewalk, and bike lanes. $ 2,028,000 $ 3,323,114 2036-2040 SUT16991 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Sinnard Ave.

Road Reconstruction: from Fir St. to Pennington Rd. Includes: drainage, curb and gutter, sidewalk, and bike lanes. $ 542,700 $ 645,100 2026-2030 SUT16981
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity South Loop Road
In Live Oak, phase-1 Township to Sinnard, construct South Loop Road, a new 4 lane connector including drainage, curb and gutter, sidewalk, and bike lanes $ 1,581,650 Post-2040 SUT17014 Planned SUT City of Live Oak
B- Road & Highway
Capacity SR 99 Widening A
Widen: Add 2 travel lanes from Ramsdell Dr. to Riviera Rd. Includes: curb, gutter, sidewalks, and drainage improvements. (Phase II) $ 8,313,000 $ 13,621,818 2036-2040 SUT17016 Planned SUT City of Live Oak
B- Road & Highway
Capacity SR 99 Widening C
Widen: Add 2 travel lanes from Elm St. to Coleman Rd. Includes: sidewalks and drainage improvements. (Phase III) $ 6,120,000 $ 10,028,333 2036-2040 SUT18906
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity SR 99 Widening D
Widen: Add 2 travel lanes from Coleman Rd. to Paseo Ave. Includes: curb, gutter, sidewalks, and drainage improvements. (Phase V) $ 734,400 Post-2040 SUT16989 Planned SUT City of Live Oak
C- Maintenance &
Rehabilitation Township Rd.

Road Reconstruction: from Pennington Road to Riviera Road. Includes drainage, curb, gutter, sidewalk, and bike lanes. $ 9,436,000 $ 15,461,985 2036-2040 SUT16988
Project
Development Only SUT City of Live Oak
B- Road & Highway
Capacity Township Road
In Live Oak, Phase-1 from Paseo Road to Pennington Road construct Township Road a new 4 lane connector including drainage, curb and gutter, sidewalk, and bike lanes. $ 17,083,000 Post-2040
SUT16956
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Bogue Rd. Widening Phase 1 Widen: 4 lanes from Harter Pkwy to Hwy 99 $ 17,526,000 Post-2040 SUT16976
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Bogue Rd. Widening Phase 2 Widen: 4 lanes from Township Rd. to George Washington Blvd. $ 4,041,000 Post-2040 SUT16957
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Bogue Rd. Widening Phase 3 Widen: 4 lanes from George Washington Blvd. to Harter Pkwy. $ 2,372,000 Post-2040 SUT18999 Planned SUT City of Yuba City
B- Road & Highway
Capacity Bridge St. - A Widen: 4 lanes from El Margarita Rd. to Walton Ave. $ 5,000,000 $ 6,400,423 2026-2030 SUT19000 Planned SUT City of Yuba City
B- Road & Highway
Capacity Bridge St. - B Widen: 4 lanes from Geo. Washington Blvd. to El Margarita Rd. $ 5,000,000 $ 7,241,491 2031-2035 SUT19001 Planned SUT City of Yuba City
B- Road & Highway
Capacity Bridge St. - C Widen: 4 lanes from Western Pkwy. to Geo. Washington Blvd. $ 5,000,000 $ 8,193,082 2036-2040

Page 72 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SUT10250 Programmed SUT City of Yuba City
B- Road & Highway
Capacity Bridge Street Widening
In Yuba City, Widen Bridge Street from Cooper Street to Gray Avenue: widen to 4 lanes. $ 9,393,543 2020-2025
SUT16961
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Butte House Rd. Widen: 4 lanes from Township Rd. to Tharp Rd. $ 18,361,000 Post-2040 SUT16963
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Clark Ave.

Roadway Operational Improvements: from Richland Rd. to Franklin Ave. add a continuous left-turn lane and bike lanes. $ 6,016,405 Post-2040 SUT16969 Planned SUT City of Yuba City
B- Road & Highway
Capacity El Margarita Rd.

Roadway Operational Improvements: from Hwy. 20 to Franklin Rd. add a continuous left turn lane and bike lanes. $ 5,189,000 $ 6,642,359 2026-2030 SUT10828 Programmed SUT City of Yuba City
B- Road & Highway
Capacity Feather River Bridge at 5th St
5th St/Bridge St crossing over the Feather River/2nd St, between Marysville and Yuba City: Replace two-lane bridge with 4-lane bridge. (HPP# 3631) (Toll Credits for ROW and CON) (Local Agency funds for CON are non-participating.).

Toll Credits for ROW, CON $ 89,102,631 2020-2025
SUT16977
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Franklin Ave. Widen: 4 lanes from Plumas Blvd. to Garden Hwy. $ 4,944,000 Post-2040 SUT10530 Planned SUT City of Yuba City
B- Road & Highway
Capacity Franklin Avenue Widen Franklin Avenue from 2 to 4 lanes from Route 99 to Clark Avenue. $ 5,224,500 $ 5,224,500 2020-2025 SUT16954
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Franklin Rd. Widen: 4 lanes from Township Rd. to Hwy. 99. $ 18,515,000 Post-2040 SUT16970
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity George Washington Blvd. Widening A Widen: 4 lanes from Hwy. 20 to Bogue Rd. $ 21,614,000 Post-2040 SUT16971 Planned SUT City of Yuba City
B- Road & Highway
Capacity George Washington Blvd. Widening B Construct New Road: 4 lanes from Pease Rd. to Hwy. 20. $ 16,486,000 $ 24,473,560 2036-2040 SUT18932 Programmed SUT City of Yuba City A- Bike & Ped Harter Parkway and Sutter Bike Path Gap Closure In Yuba City: From Hooper Road to Harter Parkway on the north side of Jefferson Avenue and on Harter Parkway from Butte House Road to Spirit Way, extend the existing 4.6-mile-long Sutter Bicycle Path from Hooper Road to Harter Parkway and build a Class I shared use path on Harter Parkway from Butte House Road to State Route 20. $ 2,241,000 2020-2025 SUT10260
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Harter Road
In Yuba City, construct 4 lanes, Harter Road between Lassen Boulevard and Bridge Street. $ 2,236,000 Post-2040
SUT16955
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Lincoln Rd. Widening D Widen: 4 lanes from Township Rd. to Garden Hwy. $ 29,975,000 Post-2040 SUT16974 Planned SUT City of Yuba City
B- Road & Highway
Capacity Pease Rd. New Interchange
Construct New Interchange: 4 lanes at Pease Rd. / Hwy 99. Includes:
overcrossing and connecting ramps at Hwy 99. $ 57,880,554 $ 85,924,008 2036-2040 SUT16962
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Pease Rd. Widening Widen: 4 lanes from Township Rd. to Hwy. 99 $ 18,972,000 Post-2040 SUT16975 Planned SUT City of Yuba City
B- Road & Highway
Capacity Percy Ave.

Widen: 4 lanes from Franklin Ave. to Garden Hwy. Includes: landscaped medians. $ 6,632,500 $ 10,868,124 2036-2040
SUT16964
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity SR 99 Widening B Widen: 6 lanes from Hwy. 20 to Bogue Rd. $ 31,434,000 Post-2040 SUT16960
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity State Route 20 - Stabler Lane to State Route 99 Widen State Route 20 from 4 to 6 lanes from Stabler Lane to State Route 99 $ 7,453,000 Post-2040 SUT16966 Planned SUT City of Yuba City
B- Road & Highway
Capacity Tharp Rd. Widen: 4 lanes from Hwy. 20 to Butte House Rd. $ 4,109,000 $ 4,648,956 2020-2025 SUT10241 Planned SUT City of Yuba City
B- Road & Highway
Capacity Walton Avenue Widening A
Widen Walton Ave from Lincoln Rd. to Franklin Rd. from 2-3 lanes to 5 lanes including upgrades to bike lanes, sidewalks, curbs, gutters, and drainage. $ 13,762,794 $ 14,459,535 2020-2025

Page 73 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SUT16965
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Walton Avenue Widening B Widen Walton Avenue to 4-lanes from Bogue Road to Augusta Lane $ 9,879,408 Post-2040 SUT10813
Project
Development Only SUT City of Yuba City
B- Road & Highway
Capacity Western Parkway Construct Western Parkway (4 lanes) from State Route 20 to Butte House Road $ 10,000,000 Post-2040 SUT18925 Programmed SUT Sutter County
C- Maintenance &
Rehabilitation
Bridge Replacement On Howsley Rd Over Pleasant Grove Creek Canal
Howsley Rd Over Pleasant Grove Creek Canal at Natomas Rd. Replace 2 lane bridge with 2 lane bridge. No added capacity. $ 7,937,000 2020-2025 SUT18876
Project
Development Only SUT Sutter County
B- Road & Highway
Capacity Howsley Rd Widening Widen Howsley Rd between Pleasant Grove Rd and Natomas Rd $ 3,960,000 Post-2040 SUT18875 Programmed SUT Sutter County
C- Maintenance &
Rehabilitation Kent Road Bridge at Sutter Butte Canal.

Kent Road over Sutter Butte Canal, 0.2 Mi South of McDonald Ave.: Replace two lane bridge with two lane bridge. (Toll credits for PE, ROW & CON.). Toll Credits for ENG, ROW, CON $ 2,760,000 2020-2025
SUT18856 Programmed SUT Sutter County
C- Maintenance &
Rehabilitation Larkin Rd. Bridge Replacement
Larkin Rd. over South Birch Sutter-Butte Canal, 0.2 miles north of Encinal Rd.:

Replace the existing 2-lane bridge with a new 2-lane bridge. $ 1,158,000 2020-2025 SUT10370
Project
Development Only SUT Sutter County
B- Road & Highway
Capacity Lincoln Rd. Widening C Widen: 2 lanes from Jones Rd. to Walton Rd. Includes: center lane. $ 3,000,000 Post-2040 SUT18855 Programmed SUT Sutter County
C- Maintenance &
Rehabilitation Nicolaus Ave. Bridge Replacement
Nicolaus Ave., over Coon Creek, 1 mile west of Pleasant Grove Rd.: Replace the existing 2-lane bridge with a new 2-lane bridge $ 1,422,000 2020-2025 SUT18936 Planned SUT Sutter County
C- Maintenance &
Rehabilitation Nuestro Road Bridge over Snake River
On Nuestro Road, 0.7 miles east of East Butte Road, Replace the existing structurally deficient bridge and the approach 300 feet east and west of the bridge for a total length of 640 feet. The width of the project site will be within the County right-of-way. $ 1,339,550 $ 1,339,550 2020-2025 SUT10340 Planned SUT Sutter County
B- Road & Highway
Capacity Riego Rd Widening Widen Riego Rd to 4 lanes, Route 99 to Placer Co. $ 3,142,000 $ 4,550,553 2031-2035 CAL18590
Project
Development Only SUT Sutter County
B- Road & Highway
Capacity Route 99, New Interchange
Sutter County, north of Sacramento: along Route 99 between Riego Road and Sankey Road, construct new interchange $ 22,000,000 Post-2040 SUT18937 Planned SUT Sutter County
C- Maintenance &
Rehabilitation Sanders Road Bridge over Sutter Butte Canal On Sanders Road, 1.2 miles west of Broadway, Replace the existing structurally deficient bridge and the approach 300 feet east and west of the bridge for a total length of 640 feet. The width of the project site will be within the County right-of-way. $ 1,338,220 $ 1,338,220 2020-2025
SUT10500
Project
Development Only SUT Sutter County
B- Road & Highway
Capacity Sankey Rd. Widen: 4 lanes from Pleasant Grove Blvd. to Hwy. 99 / Hwy. 70. $ 2,500,000 Post-2040 SUT18830 Planned SUT Sutter County
G- System
Management,
Operations, and ITS SR 99 Intersection Improvements
Intersection improvements to add turn lanes, address drainage issues and sound attenuation as needed along both sides of State Route 99 at Bogue Rd, Lincoln Rd, Richland Rd and Franklin Rd. $ 3,800,000 $ 3,800,000 2020-2025 SUT18873 Programmed SUT Sutter County
C- Maintenance &
Rehabilitation Tisdale Rd, Over Westside Canal-Sutter County Tisdale Rd., over Westside Canal, 100 E Cranmore Rd.: Replace the existing structurally deficient 2 lane bridge with a new 2 lane bridge, (Toll Credits programmed for PE, R/W, & CON.). Toll Credits for ENG, ROW, CON $ 2,221,250 2020-2025 CAL20713 Programmed VAR Caltrans D3
G- System
Management,
Operations, and ITS District 3 AVC Upgrades
In various counties on various routes at various locations within Caltrans District 3 - Repair and install permanent Automatic Vehicle Classification (AVC) truck data collection stations [CTIPS ID 107-0000-1051] $ 13,570,000 2020-2025 CAL20722 Programmed VAR Caltrans D3
G- System
Management,
Operations, and ITS District 3 LED Upgrades
In various counties on various routes at various locations within District 3 (listed under PLA-80-Var in 2018 SHOPP) - Upgrade Extinguishable Message Signs (EMS) to LED [CTIPS ID 107-0000-1035] $ 2,530,000 2020-2025 CAL20650 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS I-5 Install Vehicle Detection Stations In Sacramento and Yolo Counties I-5 Install Vehicle Detection Stations on I-5 at 9 locations $ 1,000,000 $ 1,050,625 2020-2025

Page 74 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20758 Programmed VAR Caltrans D3
G- System
Management,
Operations, and ITS Loop Detectors
In various counties on various routes at various locations within District 3 (Primary Location: I-80): Repair or replace damaged inductive loop vehicle detection elements [CTIPS ID 107-0000-1099]. Toll Credits for ENG, ROW, CON $ 1,629,000 2020-2025 CAL20760 Programmed VAR Caltrans D3
G- System
Management,
Operations, and ITS Pla/Sac/Yol Repair Field Elements
In Placer, Sacramento and Yolo Counties on I-5, I080, SR 99 and SR 113 at various locations: Replace obsolete Microwave Vehicle Detection System (MVDS) elements [CTIPS ID 107-0000-1098]. Toll Credits for ENG, ROW, CON $ 2,344,000 2020-2025 CAL20652 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS Sac/Yolo Ramp Meters
In Sacramento and Placer Counties, on Routes 51, 65 and 99 at various locations. Install ramp meters. $ 28,530,000 $ 46,749,727 2036-2040 CAL17380 Programmed VAR Caltrans D3
C- Maintenance &
Rehabilitation SACOG Region Emergency Repair Program
Lump Sum - Emergency Repair (excluding Federal Emergency Relief Program funds)for non-capacity increasing projects only. $ 400,000 2020-2025 CAL20615 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Bridge Preservation Various bridge preservation projects throughout the six-county region. $ 860,000,000 $ 1,409,210,139 2036-2040 CAL20616 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS SHOPP - Collision Reduction SHOPP - Collision Reduction $ 505,000,000 $ 827,501,302 2036-2040 CAL20617 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS SHOPP - Emergency Response SHOPP - Emergency Response $ 10,000,000 $ 16,386,164 2036-2040 CAL20584 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Facilities SHOPP- Facilities $ 20,000,000 $ 32,772,329 2036-2040 CAL20618 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Mandates SHOPP - Mandates $ 9,500,000 $ 15,566,856 2036-2040 CAL20622 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Minor SHOPP - Minor $ 200,000,000 $ 327,723,288 2036-2040 CAL20619 Planned VAR Caltrans D3 A- Bike & Ped SHOPP - Mobility SHOPP - Mobility $ 105,500,000 $ 172,874,034 2036-2040 CAL20620 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Roadside Preservation SHOPP - Roadside Preservation $ 15,000,000 $ 24,579,247 2036-2040 CAL20621 Planned VAR Caltrans D3
C- Maintenance &
Rehabilitation SHOPP - Roadway Preservation SHOPP - Roadway Preservation $ 570,000,000 $ 934,011,371 2036-2040 CAL20XXX Planned VAR Caltrans D3 A- Bike & Ped SR 99 & 113 Bike ADA Safety Improvements In Sacramento on SR 99 at 12th Ave and Florin Road (PM 23.309 &

19.71/19.808); also in Yolo County on SR 113 at County Road 31 and Russell Ave (PM 1.896/2.299 & 0.92/0.99): Provide improvements for bicycles and pedestrians by enhancing crosswalk markings, bike lane delineation, signs and signals. Upgrade pushbuttons to ADA accessible pushbuttons. EA 1J010 $ 3,700,000 2020-2025 CAL18808
Project
Development Only VAR Caltrans D3
B- Road & Highway
Capacity SR 99 Managed Lanes in both directions
Managed Lane Facility in both directions from I-5 to the SR 99/ SR 70 Wye junction in Sacramento and Sutter Counties. (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes and reversible lanes) $ 10,000,000 Post-2040
CAL20614 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS
System Management/Traffic Operations System on U.S. 50
between I-80 and Cedar Grove
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure in El Dorado and Sacramento Counties. $ 4,000,000 $ 4,754,743 2026-2030 CAL20611 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS
System Management/Traffic Operations System on I-5 between the San Joaquin County Line and SR113
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure in Placer, Sacramento and Yolo Counties. $ 5,000,000 $ 7,422,528 2036-2040 CAL20610 Planned VAR Caltrans D3
G- System
Management,
Operations, and ITS
System Management/Traffic Operations System On I-80
between SR113 and Bell Road and on Rt-51
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure in Placer, Sacramento and Yolo Counties. $ 5,000,000 $ 7,422,528 2036-2040

Page 75 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20772 Programmed VAR Caltrans D3
C- Maintenance &
Rehabilitation US 50 in Sacramento and El Dorado Counties ITS In and near Rancho Cordova and Folsom, from Sunrise Blvd. to the county line (PM 12.5/23.1); also in El Dorado County near El Dorado Hills, from the county line to Silva Valley Parkway (PM 0.0/1.7) - Install fiber optic cable [CTIPS ID 107- 0000-1121] (Toll Credits). Toll Credits for ENG. EA 1H820 $ 12,800,000 2020-2025 SAC25141
Project
Development Only VAR
Capital Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector - C - CON
Segment C: Widen Grant Line Road from 2 to 4 lanes (thoroughfare), from Bond Road to Calvine Road. Complete project development efforts, as needed, to identify and implement improvements along the corridor segment in the near-term, as needed. Improvements may include intersection improvements and frontage improvements that benefit travel for automobiles and commercial vehicles. The project listing also allows for other near-term planned project development activities to advance, including environmental clearance, so the corridor segment can eventually become a four lane facility in a manner that is consistent with the Project Design Guidelines for the corridor. $ 34,800,000 Post-2040
SAC25107
Project
Development Only VAR
Capital Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector - D1 - CON
Segment D1: Construct 4 lanes (Expressway), from Calvine Road to SR 16 (Jackson Hwy). Complete project development efforts, as needed, to identify and implement improvements along the corridor segment in the near-term, as needed. Improvements may include intersection improvements and frontage improvements that benefit travel for automobiles and commercial vehicles.

The project listing also allows for other near-term planned project development activities to advance, including environmental clearance, so the corridor segment can eventually become a four lane facility in a manner that is consistent with the Project Design Guidelines for the corridor. $ 47,200,000 Post-2040 VAR56133 Planned VAR
Capital Southeast
Connector JPA
B- Road & Highway
Capacity
Capital SouthEast Connector - D2 - CON From Douglas Road to White Rock Road.

Construction of Segment D2: Construct 4 lanes (Expressway), from Douglas to White Rock Road. $ 24,847,500 $ 35,986,589 2031-2035
ELD19469 Planned VAR
Capital Southeast
Connector JPA
B- Road & Highway
Capacity
Capital SouthEast Connector - E2 - CON From Latrobe Road to the US 50/Silva Valley Pkwy Interchange
Segment E2: Widen White Rock Road from 2 to 4 lanes (thoroughfare), from Latrobe Road to the US 50/Silva Valley Parkway Interchange. $ 6,000,000 $ 8,689,789 2031-2035 VAR56132
Project
Development Only VAR
Capital Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector- Phase 2
Capital SouthEast Connector Phase 2 will include adding HOV lanes as needed and constructing interchanges at various locations. $ 209,300,000 Post-2040 CAL18320 Programmed VAR
Capitol Corridor
JPA
C- Maintenance &
Rehabilitation Sacramento to Roseville Third Main Track - Phase 1 On the Union Pacific mainline, from near the Sacramento and Placer County boarder to the Roseville Station area in Placer County: Construct a layover facility, install various Union Pacific Railroad Yard track improvements, required signaling, and construct the most northern eight miles of third mainline track between Sacramento and Roseville (largely all in Placer County), which will allow up to two additional round trips (for a total of three round trips) between Sacramento and Roseville. $ 82,276,000 2020-2025 VAR56199 Programmed VAR
Capitol Corridor
JPA
E- Transit Capital
(Major) Sacramento to Roseville Third Main Track - Phase 2 On the UP mainline, from Sacramento Valley Station approximately 9.8 miles toward the Placer County line: Construct third mainline track including all bridges and required signaling. Project improvements will permit service capacity increases for Capitol Corridor in Placer County, with up to seven additional round trips added to Phase 1-CAL18320 (for a total of ten round trips) between Sacramento to Roseville including track and station improvements. $ 195,000,000 2020-2025

Page 76 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
SAC24732 Programmed VAR
City of Citrus
Heights A- Bike & Ped
Auburn Blvd. Complete Streets - Phase 2 (Rusch Park to Whyte Avenue intersection)
Auburn Blvd. from the northern city limits, including Whyte Ave intersection in City of Roseville, to Rusch Park: Construct class II bicycle lanes, landscape buffered sidewalks, transit stop improvements. On Auburn Blvd. near Whyte Ave., construct new gateway traffic signal/intersection. On Whyte Ave at Auburn Blvd., close left turns from Whyte. Ave. (CMAQ funds only for work within Citrus Heights, not work in Roseville.) ($1,512,000 ATP for CON and $13,000 for CON Non-Infrastructure) $ 15,493,242 2020-2025 SAC25106
Project
Development Only VAR City of Elk Grove
B- Road & Highway
Capacity Capital SouthEast Connector - B3 - CON
Segment B3: Widen Grant Line Road from 2 to 4 lanes (thoroughfare), from Bradshaw Road to Bond Road. Complete project development efforts, as needed, to identify and implement improvements along the corridor segment in the near-term, as needed. Improvements may include intersection improvements and frontage improvements that benefit travel for automobiles and commercial vehicles. The project listing also allows for other near-term planned project development activities to advance, including environmental clearance, so the corridor segment can eventually become a four lane facility in a manner that is consistent with the Project Design Guidelines for the corridor. $ 23,600,000 Post-2040
YOL19328 Programmed VAR
City of West
Sacramento
B- Road & Highway
Capacity Broadway Bridge
From West Sacramento to Sacramento, across the Sacramento River, construct the Broadway Bridge, a new southern crossing of the Sacramento River.

Project includes: Auto, transit, bicycle and pedestrian facilities. (Local funding is split between the Cities of Sacramento and West Sacramento) $ 254,500,000 2026-2030 VAR56273 Planned VAR
Multiple Lead
Agencies
C- Maintenance &
Rehabilitation Local Streets and Roads Maintenance Lump-sum for annual local streets and roads maintenance $ 2,200,000,000 $ 3,604,956,169 2036-2040 SAC24420 Planned VAR
Multiple Lead
Agencies
B- Road & Highway
Capacity Sacramento River Crossing
New Northern Bridge: from Sacramento to West Sacramento across the Sacramento River. Includes: Auto, transit, bicycle and pedestrian facilities. The Sacramento River Crossings Alternatives Study analyzed a new crossing at either Richards Blvd or C Street, but final alignment options will be studied in subsequent planning efforts. $ 150,000,000 $ 173,954,013 2026-2030 VAR56272 Planned VAR
Multiple Lead
Agencies
F- Transit O&M
(General) Transit Operating & Maintenance
Lump-sum annual Operating & Maintenance costs for fiscal years 2023-2040; does not account for expansion of service $ 5,400,000,000 $ 8,848,528,778 2036-2040 YCT18199 Planned VAR
Multiple Lead
Agencies
E- Transit Capital
(Major) West Sacramento/Sacramento Streetcar (Phase 2)
Construction Phase 2 Downtown/Riverfront Streetcar: South to R Street and Broadway corridors $ 45,000,000 $ 65,173,417 2031-2035
VAR56207 Programmed VAR RT
E- Transit Capital
(Minor) Connect Card Implementation
Implementation and operational activities associated with Connect Card.

Connect Card is an electronic transit fare collection system for the transit agencies in the Sacramento Region.. Toll Credits for CON $ 247,575 2020-2025 REG18046 Programmed VAR RT
E- Transit Capital
(Vehicles) El Dorado County Transit Authority- Bus Replacement Replace one 32- foot gasoline 2012 International Bus and three 35 ft Bluebird Diesel buses with four 35-foot Gillig diesel buses. $ 1,750,202 2020-2025 REG18052 Programmed VAR RT F- Transit O&M (Bus)
Operating Assistance for the UC Davis Medical Center Shuttle Service
Between UC Davis and UC Davis Medical Center with limited stops in between:

Operating assistance for three years. Operations would take place weekdays, approximately between 5:30 AM and 8:30 PM. $ 6,000,000 2020-2025 VAR56208 Programmed VAR SACOG
E- Transit Capital
(Minor) Connect Card Implementation
Implementation and operational activities associated with Connect Card.

Connect Card is an electronic transit fare collection system for the transit agencies in the Sacramento Region. (See VAR56207.). Toll Credits for CON $ 198,089 2020-2025 VAR56271 Planned VAR SACOG
D- Programs &
Planning Green-Means-Go
Green Means Go is a multi-year pilot program to lower greenhouse gas emissions in the six-county Sacramento region by accelerating infill development, reducing vehicle trips, and electrifying remaining trips. $ 400,000,000 $ 655,446,576 2036-2040

Page 77 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
VAR56197 Programmed VAR SACOG
D- Programs &
Planning Planning Programming and Monitoring (RSTP) Phase 3 Conduct necessary planning, state and federal programming, and monitoring activities, including updates to the MTP, revisions to the MTIP and STIP, ensuring timely delivery of projects using state and federal funds, coordination with FHWA, FTA, Caltrans, CTC, transit operators, and local project sponsors.

Ongoing. (See VAR56008, VAR56101) (Toll Credits). Toll Credits for CON $ 641,267 2020-2025 VAR56196 Programmed VAR SACOG
D- Programs &
Planning PPM Sacramento, Sutter, Yolo, Yuba Counties
For SACOG staff to plan, program and monitor (non-construction) for the counties of Sacramento, Sutter, Yolo, and Yuba. (Previous phases: SAC21710, SUT10450, YOL17010, YUB15630) $ 5,892,000 2020-2025
VAR56125 Programmed VAR SACOG
D- Programs &
Planning Regional Bicycle and Pedestrian Data Collection In the SACOG Region: develop regional standards for evaluating bicycle/pedestrian projects, procure automated bicycle/pedestrian counters, and develop a smartphone application for collecting user?s bicycle/pedestrian travel data (Toll Credits for CON). (CycleSac). Toll Credits for CON $ 559,510 2020-2025 VAR56184 Programmed VAR SACOG
D- Programs &
Planning Transportation Demand Management (TDM) Phase 3 TDM is a general term for strategies that result in more efficient use of transportation resources. SACOG's TDM program promotes alternative mode use in the SACOG region (rideshare, carpooling, vanpooling, public transit, bicycling, walking, and telecommuting. Outreach is done through partners (TMAs, and public agencies working with employers). Provide funding for 12 Transportation Management Organizations (TMOs) in region through grants. (Emission Benefits: ROG 0.54 and NOx 0.5 kg/day) (This is a continuation of Phase 2, VAR56025). Toll Credits for CON $ 11,709,088 2020-2025 VAR56195 Programmed VAR SMAQMD
D- Programs &
Planning SECAT Program Phase 3
Phase 3 of Sacramento Emergency Clean Air Transportation Program (SECAT), Heavy-Duty NOx control strategies. (Phase 1 SAC22090, Phase 2 VAR56037 ) (Emission Benefits in kg/day: 236 NOx, 21 PM10, 9 ROG. And in kg/day for each $3m increment: 835 NOx, 109 ROG) (Toll Credits). Toll Credits for CON $ 11,175,428 2020-2025 VAR56201 Programmed VAR SMAQMD
D- Programs &
Planning Spare the Air Phase 3
Sacramento Federal Non-attainment Area: Spare The Air Voluntary Driving Curtailment Program. [Continued from SAC21080 and VAR56006] (Emission Benefits in kg/day: ROG 0.2, NOx 0.2) $ 3,908,808 2020-2025 ELD19468 Programmed VAR
Southeast
Connector JPA
B- Road & Highway
Capacity Capital SouthEast Connector - E1
In El Dorado Hills: White Rock Rd between Carson Crossing Dr and Latrobe Rd; widen from 2 to 4 lanes (Thoroughfare). (To be constructed with Capital SouthEast Connector – D3, SAC24250.) $ 4,450,000 2036-2040 YOL19346 Programmed VAR Yolo County
C- Maintenance &
Rehabilitation CR 96 Bridge Replacement, Union School Slough County Road 96, over Union School Slough, 1.38 Mi South of CR 27: Replace two lane bridge with two lane bridge. (Toll Credits for PE, ROW, & CON). Toll Credits for ENG, ROW, CON $ 1,741,779 2020-2025
CAL21302 Planned
Various:

ELD, NEV Caltrans D3
C- Maintenance &
Rehabilitation SLT & Truckee Maintenance Facilities Build pre-wash facilities $ 800,000 $ 1,310,893 2036-2040 CAL20571 Planned
Various:

ELD, PLA,

SAC, SUT,
YUB, YOL Caltrans D3 A- Bike & Ped Complete Streets Improvements to the SHS Complete Streets improvements in various locations on the State Highway System (SHS) in El Dorado, Placer, Sacramento, Sutter, Yuba and Yolo Counties. $ 50,000,000 $ 52,531,250 2020-2025 CAL20612 Planned
Various:

PLA, YUB Caltrans D3
C- Maintenance &
Rehabilitation
System Management/Traffic Operations System on SR 65
between I-80 and SR 70
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure in Placer and Yuba Counties. $ 4,000,000 $ 4,754,743 2026-2030 CAL20708 Programmed
Various:

SAC, PLA Caltrans D3
C- Maintenance &
Rehabilitation I-80 Fiber Optics at Various Locations
In and near the cities of Sacramento and Citrus Heights, I-80, from east of the Yolo County Line to the Placer County Line (PM M0.1/18.0); also in Placer County in the City of Roseville I-80, from the Sacramento County Line to east of the Sacramento County Line (PM 0.0/0.7) - Install fiber optics communication lines (Toll Credits). Toll Credits for ENG, ROW, CON. EA 0H540 $ 19,000,000 2020-2025

Page 78 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL20830
Project
Development Only
Various:

SAC, PLA Caltrans D3
G- System
Management,
Operations, and ITS
I-80 Managed Lanes from Yolo/Sac County line to the I-80/SR65 IC Convert existing HOV lanes to toll lanes or possibly install a reversible lane $ - Post-2040 CAL21299 Planned
Various:

SAC, PLA Caltrans D3
C- Maintenance &
Rehabilitation
In Sacramento and Placer Counties on Route 80 at various locations - Infill planting to preserve landscape freeway status Infill planting to preserve landscape freeway status $ 1,250,000 $ 2,048,271 2036-2040 CAL20613 Planned
Various:

SAC, SUT Caltrans D3
G- System
Management,
Operations, and ITS
System Management/Traffic Operations System on SR99
between the San Joaquin County Line and SR20
Operational Improvements: traffic monitoring stations, closed circuit television, highway advisory radio, changeable message signs, and other system management infrastructure in Sacramento and Sutter Counties. $ 5,000,000 $ 7,422,528 2036-2040 CAL21276 Programmed
Various:

SOL, YOL,
SAC Caltrans D3
B- Road & Highway
Capacity I-80 / U.S. 50 Managed Lanes in both directions On I-80 just west of Davis in both directions from the Kidwell Rd IC in Solano County (D4) to the US-50/I-5 interchange and I-80/West El Camino interchange in Sacramento: Construct managed lanes, pedestrian/bicycle facilities and ITS elements (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes and reversible lanes). EA 3H900 $ 442,000,000 2026-2030 CAL20775 Programmed
Various:

YOL /COL Caltrans D3
G- System
Management,
Operations, and ITS
I-5 Vertical Clearance Improvements in Yolo and Colusa
Counties
In Yolo, Colusa, and Glenn Counties, increase vertical clearance of structures 22-0155, 22-0156, 22-0157, 15-0067, and 15-0075; improve 22-0155 and 22- 0157 to current standards from current fair health rating (Accelerated Freight Delivery Project). 3H391 $ 14,674,000 2020-2025
YST10532 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Commuter Bus Replacement B Replace 5 Commuter Buses $ 3,125,000 $ 3,535,651 2020-2025 YST10534 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Commuter Bus Replacement C Replace 5 Commuter Buses $ 3,125,000 $ 3,807,509 2026-2030 YST10523 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Commuter Bus Replacement D Replace 11 Commuter Buses $ 6,875,000 $ 9,246,111 2031-2035 YST10527 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Commuter Bus Replacement E Replace 5 Commuter Buses $ 3,125,000 $ 5,120,676 2036-2040 YST10528 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Fixed Route Bus Replacement A Replace 11 Fixed Route Buses $ 5,500,000 $ 5,500,000 2020-2025 YST10530 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Fixed Route Bus Replacement B Replace 11 Fixed Route Buses $ 6,500,000 $ 7,538,007 2026-2030 YST10522 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Fixed Route Bus Replacement C Replace 15 Fixed Route Buses $ 7,500,000 $ 10,086,666 2031-2035 YST10525 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Fixed Route Bus Replacement D Replace 13 Fixed Route Buses $ 6,500,000 $ 10,137,782 2036-2040 YST10529 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement C Replace 7 Paratransit Vehicles $ 1,050,000 $ 1,159,004 2020-2025 YST10531 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement D Replace 10 Paratransit Vehicles $ 1,500,000 $ 1,739,540 2026-2030 YST10521 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement E Replace 10 Paratransit Vehicles $ 150,000 $ 187,329 2026-2030 YST10524 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement F Replace 10 Paratransit Vehicles $ 1,500,000 $ 2,067,767 2031-2035 YST10526 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Vehicles) Paratransit Vehicle Replacement G Replace 10 Paratransit Vehicles $ 1,500,000 $ 2,457,925 2036-2040 YST10533 Planned
Various:

YUB, SUT
Yuba Sutter
Transit
E- Transit Capital
(Major) Replace Bus Facility #10424 Replace Current Bus Facility $ 25,000,000 $ 36,207,454 2031-2035 CAL21181
Project
Development Only YOL Caltrans D3
G- System
Management,
Operations, and ITS Add Aux Lane- New SR-113 NB to I-5 SB Connector (T) I-5 - Add Aux Lane- New SR-113 NB to I-5 SB Connector (T) $ 66,310,000 Post-2040 CAL20900
Project
Development Only YOL Caltrans D3
G- System
Management,
Operations, and ITS Add Aux Lane- SR-275 on ramp to Harbor Blvd off ramp Add Aux Lane- SR-275 on ramp to Harbor Blvd off ramp $ 5,440,000 Post-2040

Page 79 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21241 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation
Esparto Maintenance Facility - Build crew room, rest rooms & office Build crew room, rest rooms & office $ 450,000 $ 737,377 2036-2040 CAL20847 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Facilities, West Sac Maintenance Station - Crew Room West Sac Maintenance Station - Crew Room. EA 1F510 $ 4,420,000 $ 5,253,991 2026-2030 CAL15881 Programmed YOL Caltrans D3
B- Road & Highway
Capacity I-5 / 113 Connector Phase 2
Phase 2 - Construct northbound I-5 to southbound SR 113 freeway to freeway connection. $ 111,285,137 2031-2035
CAL15882
Project
Development Only YOL Caltrans D3
B- Road & Highway
Capacity I-5 / SR 113 Interchange
Construct New Interchange: NB SR 113 to SB I-5 freeway to freeway connection. Phase 3. $ 66,000,000 Post-2040
CAL20812
Project
Development Only YOL Caltrans D3
B- Road & Highway
Capacity I-5 Managed Lanes: Sacramento International Airport to SR 16 I-5 Managed Lanes: Yolo County Line to SR 16 (project description may change based on results from the Managed Lanes Study. Project is being evaluated for Expressed Toll Lanes, High Occupancy Toll Lanes, HOV lanes) $ - Post-2040 CAL20709 Programmed YOL Caltrans D3
G- System
Management,
Operations, and ITS I-5 Roadside Safety
In and near Woodland, I-5, from the Sacramento County Line to the Colusa County Line (PM 0.4/R28.9) - Improvements to reduce maintenance worker exposure [includes roadside paving, paving areas beyond gore, and access gates and roads, vehicle pullouts] (Toll Credits). Toll Credits for ENG, ROW, CON. 4F830 $ 2,134,000 2020-2025
CAL21065 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS I-80 Detection
In Yol, Sac, Pla, & Nev Counties on Route 80 at various locations. Inductive Loop Replacement. $ 2,000,000 $ 2,436,806 2026-2030
CAL20832 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS I-80 ICM B Implement ICM strategies on the I-80 Corridor in Yolo County (Non-capacity) $ 45,000,000 $ 66,802,753 2036-2040 CAL20935 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation I-80 Pavement Rehabilititation C
In and near Davis from Solano County Line to Yolo Causeway (Br#22-45).

SHOPP ID 11365 $ 34,027,000 $ 41,182,018 2026-2030
CAL20712 Programmed YOL Caltrans D3
C- Maintenance &
Rehabilitation
I-80 Sacramento River BOH (Bryte Bend) (G13 Contingency Project)
In West Sacramento, I-80, at the Sacramento River Bridge and Overhead #22- 0026L/R (PM R11.3) (G13 Contingency Project - Rehabilitate Bridge (Toll Credits). Toll Credits for ENG, ROW $ 39,497,000 2020-2025 CAL20984 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation
In Yolo County from Cache Crrek Bridge (Br#22-0019) to County Road 46. CAPM.

In Yolo County from Cache Crrek Bridge (Br#22-0019) to County Road 46.

CAPM. SHOPP ID 17656 $ 4,440,000 $ 5,683,575 2026-2030
CAL20993 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS
In Yolo County on Route 5 Southbound from County Road 8 OC (22-30) to I-505. Auxiliary Lane.

In Yolo County on Route 5 from SB off-ramp to Route 505 to County Road 8 OC (#22-30): Auxiliary lane. SHOPP ID 17689 $ 6,800,000 $ 8,704,575 2026-2030 CAL21002 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS
In Yolo County on Route 80, EB on ramp from Webster/Chiles Rd. Add storage lane and metering. Yol 80 EB Chiles Rd Onramp.In Yolo County on Route 80, EB on ramp from Webster/Chiles Rd. Add storage lane and metering. Yol 80 EB Chiles Rd On-ramp. SHOPP ID 18159 $ 8,600,000 $ 11,008,727 2026-2030 CAL21146 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install Meter - EB S River Rd. Install Meter - EB S River Rd. $ 380,000 $ 440,683 2026-2030 CAL21162 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB E Gibson Rd. NB Install Meter - EB E Gibson Rd. NB $ 300,000 $ 491,585 2036-2040 CAL20893 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB E Gibson Rd. SB Install Meter - EB E Gibson Rd. SB $ 300,000 $ 491,585 2036-2040 CAL21156 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install meter - EB Hutchinison Drive on SR 113 Install Meter - EB Hutchinson Drive NB $ 300,000 $ 491,585 2036-2040 CAL21173 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB Hutchinson Drive SB Install Meter - EB Hutchinson Drive SB $ 300,000 $ 491,585 2036-2040 CAL21145 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install Meter - EB Jefferson Blvd Install Meter - EB Jefferson Blvd $ 380,000 $ 440,683 2026-2030 CAL20907 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB Richards Blvd Install Meter - EB Richards Blvd $ 300,000 $ 491,585 2036-2040

Page 80 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21172 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - EB Russell Blvd SB Install Meter - EB Russell Blvd SB $ 300,000 $ 491,585 2036-2040 CAL21139 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB County Rd. 102 Install Meter - NB County Rd. 102 $ 380,000 $ 622,674 2036-2040 CAL20892 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB E Main Street Install Meter - NB E Main Street $ 300,000 $ 491,585 2036-2040 CAL21141 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB N East St. Install Meter - NB N East St. $ 380,000 $ 622,674 2036-2040 CAL21137 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB Old River Rd. Install Meter - Old River Rd. $ 380,000 $ 622,674 2036-2040 CAL21150 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install meter - NB Richard Blvd WB Install meter - NB Richard Blvd WB $ 300,000 $ 423,892 2031-2035 CAL20890 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB Route 25A Install Meter - NB Route 25A $ 300,000 $ 491,585 2036-2040 CAL21161 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB Route 27 Install Meter - NB Route 27 $ 300,000 $ 491,585 2036-2040 CAL21160 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB Route 29 Install Meter - NB Route 29 $ 300,000 $ 491,585 2036-2040 CAL21158 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB Russell Blvd Install Meter - NB Russell Blvd $ 300,000 $ 491,585 2036-2040 CAL21140 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB SR-113 Install Meter - SR-113 Connector $ 1,940,000 $ 3,178,916 2036-2040 CAL21159 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - NB W Covell Blvd Install Meter - NB W Covell Blvd $ 300,000 $ 491,585 2036-2040 CAL21165 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB 5 to SB 113 Install Meter - SB 5 to SB 113 $ 1,940,000 $ 3,178,916 2036-2040 CAL21138 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB County Rd. 102 Install Meter - SB County Rd. 102 $ 380,000 $ 622,674 2036-2040 CAL21143 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB E Main St. Install Meter - SB E Main St. $ 380,000 $ 622,674 2036-2040 CAL21142 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB N East St. Install Meter - SB N East St. $ 380,000 $ 622,674 2036-2040 CAL21144 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB Old River Rd. Install Meter - SB Old River Rd. $ 380,000 $ 536,930 2031-2035 CAL21149 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install meter - SB Richard Blvd. WB Install meter - SB Richard Blvd. WB $ 300,000 $ 423,892 2031-2035

Page 81 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21167 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB Route 25 A Install Meter - SB Route 25 A $ 300,000 $ 491,585 2036-2040 CAL21168 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB Route 27 Install Meter - SB Route 27 $ 300,000 $ 491,585 2036-2040 CAL20894 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB Route 29 Install Meter - SB Route 29 $ 300,000 $ 491,585 2036-2040 CAL21170 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - SB W Covell Blvd Install Meter - SB W Covell Blvd $ 300,000 $ 491,585 2036-2040 CAL21152 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install meter - WB Chiles Rd Install meter - WB Chiles Rd $ 300,000 $ 423,892 2031-2035 CAL20891 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB E Gibson Rd. NB Install Meter - WB E Gibson Rd. NB $ 300,000 $ 491,585 2036-2040 CAL21166 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB E Gibson Rd. SB Install Meter - WB E Gibson Rd. SB $ 300,000 $ 491,585 2036-2040 CAL21153 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install meter - WB Enterprise Install meter - WB Enterprise $ 300,000 $ 347,908 2026-2030 CAL21157 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB Hutchinson Drive NB Install Meter - WB Hutchinson Drive NB $ 300,000 $ 491,585 2036-2040 CAL20896 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB Hutchinson Drive SB Install Meter - WB Hutchinson Drive SB $ 300,000 $ 491,585 2036-2040 CAL21148 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install Meter - WB Jefferson Blvd Install Meter - WB Jefferson Blvd $ 300,000 $ 347,908 2026-2030 CAL21151 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install meter - WB Mace Blvd Install meter - WB Mace Blvd $ 900,000 $ 1,271,676 2031-2035 CAL20895 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS Install Meter - WB Russell Blvd SB Install Meter - WB Russell Blvd SB $ 300,000 $ 491,585 2036-2040 CAL21147 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install Meter - WB SR-275 Install Meter - WB SR-275 $ 300,000 $ 347,908 2026-2030 CAL21155 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Install meter - WB West Capitol Ave Install meter - WB West Capitol Ave $ 300,000 $ 347,908 2026-2030 CAL20793 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Putah Creek Seismic Restoration
Near Winters on SR 505 at Putah Creek Bridge #22-0072L/R from Solano County line to 0.4 mile south of SR 128 (PM 0.0/0.2); also in Solano County from 0.3 mile south to the Yolo County line (PM R10.3/R10.6): Seismic retrofit of two parallel bridges. EA 2H450 $ 19,904,000 2031-2035 CAL21008 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 113 Pavement Rehabilitation A
In Knights Landing from County Road 102 to Sacramento River Br (22-0040).

Include YOL 45 (PM 0.0/0.2). SHOPP ID 18418 $ 4,190,000 $ 5,105,108 2026-2030 CAL20983 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 113 Pavement Rehabilitation B In Yolo County from Rte 5 North to Dubach Park. SHOPP ID 17655 $ 1,750,000 $ 2,185,510 2026-2030 CAL20626 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 128 Class II Bike Lane
Where ROW permits, construct Class II bike lane on SR 128 from Valley Oak Dr. to E. Main St., Winters (PM 7.755 to 9.359) $ 2,730,000 $ 4,473,423 2036-2040 CAL20970 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 128 Pavement Rehabilitation
West of and in winters from Solano Co Line to Jct 505 (PM 0.0/9.8). SHOPP ID 16921 $ 13,050,000 $ 16,235,219 2026-2030
CAL20627 Planned YOL Caltrans D3
B- Road & Highway
Capacity SR 16 & CR 85B Intersection modification
Install intersection controls at SR 16 and County Road 85B (PM 26.3/26.4).

SHOPP ID 18154 $ 7,200,000 $ 2,969,011 2036-2040

Page 82 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
CAL21051 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 16 Pavement Rehabiliation
In Yolo County on Route 16 from approx 0.6 mile west of Cache Creek to approx. 0.1 mile east of County Road 42 (PM 0.0/8.2). SHOPP ID 20551 $ 4,600,000 $ 5,744,770 2026-2030 CAL21050 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 16 Pavement Rehabilitation A
In Yolo County on Route 16 from approx. 0.3 mile west of County Rd 79 to County Road 21A (PM 20.5/28.2). SHOPP ID 20550 $ 12,100,000 $ 15,111,242 2026-2030 CAL20866 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 16 Pavement Rehabilitation B
In Yolo County on Route 16 from County Rd 42 to approx. 0.4 mile west of County Rd 79 (PM 8.2/20.5) SHOPP ID 20541 $ 7,800,000 $ 9,741,131 2026-2030 CAL21040 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 16 Pavement Rehabilitation C
In Yolo County on Rte 16 from County Rd 98 to Route 5 Junction (PM R40.5/R43.42) SHOPP ID 20445 $ 4,600,000 $ 5,744,770 2026-2030 CAL20528 Programmed YOL Caltrans D3
G- System
Management,
Operations, and ITS SR 16 Safety Improvement Project - Phase 2 Near Cadenasso, from 0.4 mile west of County Road 79 to 0.4 mile east of County Road 79; also from Esparto to 0.2 mile west of Route 505 - Shoulder widening, curve correction, left-turn channelization, signalization and two-way left-turn lanes (PM 20.5/31.6 [EFIS ID 0314000272; CTIPS ID 10700000983]; Phase 1 of project is 03-0C471 / CAL18743 (Toll Credits for PE, ROW, CON).

Toll Credits for ENG, ROW, CON. EA 0C472 $ 37,299,000 2020-2025 CAL20982 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 16 Slope Stabilization
In Yolo County along SR 16. Slope stabilization, slide protection/repair, slide detention basin, slide clean up (PM 0.0/6.0). SHOPP ID 17594 $ 3,050,000 $ 3,809,032 2026-2030 CAL20510 Programmed YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 275 Tower Bridge Fender Replacement
In West Sacramento, on SR 275, at the Tower Bridge (Sacramento River Bridge #22-0021) - Replace existing fender system (PM 13.1) [EFIS ID 0313000137; CTIPS ID 107-0000-0971] (Toll Credits for PE, ROW, CON). Toll Credits for ENG, ROW, CON $ 14,916,000 2020-2025
CAL20663 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 45 CIR with HIMA Overlay
SR 45 from Junction 113 in Knights Landing to Colusa Co Line - Cold in-place recycle with Hot Mix Asphalt Overlay (EA 0G900) $ 15,200,000 $ 15,200,000 2020-2025 CAL21049 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 84 Pavement Rehabilitation
In Yolo County on Route 84 from County Rd 161 to approx. 0.5 mile north of Courtland Rd. SHOPP ID 20542 $ 6,540,000 $ 8,167,564 2026-2030 CAL20765 Programmed YOL Caltrans D3
C- Maintenance &
Rehabilitation SR 84 Restore Pavement and Levee Embankment Near West Sacramento, on SR 84, from 3.7 miles north of Clarksburg Road to Levee Access Road (PM 13.3/15.7) - Permanent restoration of damaged pavement and supporting levee embankment [CTIPS ID 107-0000-1102] (Toll Credits). Toll Credits for ENG, ROW, CON. EA 2H460, PM 13.3/15.7 $ 70,040,000 2020-2025 CAL21064 Planned YOL Caltrans D3
G- System
Management,
Operations, and ITS US 50 Detection
In Yol, Sac, & ED Counties on Route 50 at various locations. Inductive Loop Replacement. $ 2,000,000 $ 2,377,372 2026-2030
CAL21192 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation West Sac Mtce Station - Install wash facility Install wash facility $ 975,000 $ 1,597,651 2036-2040 CAL20842 Planned YOL Caltrans D3
C- Maintenance &
Rehabilitation Winters. Repair/upgrade curb ramps. Winters. Repair/upgrade curb ramps. SHOPP ID 18373 $ 2,600,000 $ 3,328,220 2026-2030 CAL20711 Programmed YOL Caltrans D3
C- Maintenance &
Rehabilitation Yolo County I-5 Curb Ramp Upgrades
In and near Woodland, I-5, from East Main Street to County Road 13 at various locations (PM R6.5/R17.6) - Upgrade ADA facilities [CTIPS ID 107-0000-1050].

EA 3F140 $ 860,000 2020-2025
YOL19401 Planned YOL City of Davis A- Bike & Ped Anderson Road Improvements Street redesign to improve walking, biking, and transit. Includes frontage improvements at Chavez elementary school, intersection safety improvements, widened sidewalks, and landscaped medians. Dedicated planning process with outreach scheduled for FY 17/18. Will be applying for Grant funding for construction in FY 19/20 and FY 20/21. Implements WBAR High Priority projects for Chavez E.S. Project currently ranks 1st in the Transportation Implementation Plan. $ 8,170,000 $ 12,128,411 2036-2040 YOL19408 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Covell / Pole Line Road Protected Intersection Protected intersection at Pole Line Road & Covell Blvd. $ 1,125,000 $ 1,670,069 2036-2040 YOL19406 Planned YOL City of Davis A- Bike & Ped Covell Blvd Shared-Use Path (J Street to Pole Line Road) Shared-use path on south side from J Street to Pole Line Rd. $ 760,000 $ 1,128,224 2036-2040

Page 83 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
YOL17130 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Covell Blvd. Turn Lanes and Overcrossing Add Turn Lanes: Covell Blvd. / Hwy. 113. Includes: turn lanes for access-egress to Hwy. 113 including the overcrossing structure. $ 15,000,000 $ 22,267,584 2036-2040 YOL17180 Planned YOL City of Davis
B- Road & Highway
Capacity Covell Blvd. Widening
Widen: 4 lanes from Shasta Dr. to Denali Dr. Includes: bike lanes and a center median. $ 1,600,000 $ 2,375,209 2036-2040
YOL19407 Planned YOL City of Davis A- Bike & Ped Downtown Gateway Arch Downtown gateway arch and bike/ped crossing of Richards Blvd immediately south of the U.P. Railroad bridge. $ 6,800,000 $ 10,094,638 2036-2040 YOL19210 Planned YOL City of Davis
E- Transit Capital
(Minor) Downtown Multimodal Parking Structure
In Davis, at downtown Amtrak Depot, improve entrance and parking lot, provide additional parking, construct bike/ped crossing of the railroad tracks, and improve service by increasing the frequency of bus service to the facility.

This improved bus service will require the purchase of an additional one to two heavy-duty buses. (Buses would be purchased with Earmarks CA-E2007?BUSP0060 for $200,640 and CA-2008-BUSP-0060 for $217,380) $ 15,370,000 $ 19,674,899 2026-2030 YOL19448 Programmed YOL City of Davis
E- Transit Capital
(Vehicles) Electrify Yolo
The City of Davis, in partnership with Valley Clean Energy, at various locations in Yolo County, Davis, and Woodland: Install electric vehicle (EV) charging infrastructure. In Davis, between UC Davis, downtown Davis, and the Davis Amtrak Station: Launch electric microtransit pilot project, an electric shuttle. $ 3,289,000 2020-2025 YOL19409 Planned YOL City of Davis
G- System
Management,
Operations, and ITS EV Charging Station Infrastructure
Per EV Readiness Plan, identify priorities and funding for installation of charging stations at city facilities. $ 200,000 $ 296,901 2036-2040 YOL19410 Planned YOL City of Davis A- Bike & Ped F Street Improvements (Fifth Street to Covell Blvd) Corridor safety improvements including intersection curb extensions, Class IV bike lanes, enhanced crossings, enhanced transit stops. $ 1,000,000 $ 1,484,506 2036-2040 YOL19411 Planned YOL City of Davis A- Bike & Ped Fifth Street Improvements (L Street to Pole Line Road) Restripe/Redesign corridor to include Class IV parking-protected bike lanes, restriping, mid-block crossing. $ 350,000 $ 350,000 2020-2025 YOL17140 Programmed YOL City of Davis
C- Maintenance &
Rehabilitation I-80/Richards Interchange
In Davis: At the I-80/Richards interchange; reconstruct the north side of Richards Blvd. interchange to remove the loop on- and off-ramps and replace with new ramp in diamond configuration. Includes traffic signal installation.

Install new Class II bike lanes and a parallel Class I trail (0.5 mi of Class I and 1 mi of Class II). (CMAQ funds are for eligible bike/ped components only.). Toll Credits for CON $ 12,764,763 2036-2040
YOL17160 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Lake Blvd. / Covell Blvd. Traffic Signalization: at Lake Blvd/Covell Blvd. $ 250,000 $ 371,126 2036-2040 YOL17170 Planned YOL City of Davis
B- Road & Highway
Capacity Mace Blvd Curve
In Davis, between Alhambra Dr. and Alhambra Dr. (Mace curve), widen from 2 to 4 lanes, provide bike lanes, a landscaped median, and turn lanes. $ 2,300,000 $ 3,331,086 2031-2035 YOL19412 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Olive Drive / Train Depot Overcrossing Grade-separated crossing between the Olive Drive neighborhood and the Amtrak station. $ 6,500,000 $ 6,500,000 2020-2025
YOL19402 Planned YOL City of Davis A- Bike & Ped Olive Drive Improvements (S. Putah Creek Parkway to I-80) Class IV bike lanes or two-way cycle track with accompanying street safety enhancements including enhanced crossings. $ 1,550,000 $ 2,300,984 2036-2040 YOL19403 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Pole Line Road / Fifth Street Intersection Improvements Protected intersection at Pole Line Road & Fifth Street. $ 1,125,000 $ 1,670,069 2036-2040 YOL19393 Programmed YOL City of Davis A- Bike & Ped
Providing Safe Passage: Connecting Olive Drive and
Montgomery Elementary School
Design and construct Safe Routes to School Infrastructure improvements for Montgomery Elementary School and a bicycle/pedestrian bridge from the Olive Drive bike path to the two-way multi-use path on the Pole Line Road overcrossing. $ 4,300,000 2020-2025
YOL19404 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Russell Blvd Improvements (A Street to west City Limit) Street redesign to improve circulation, multi-modal transportation, and intersection safety. $ 5,000,000 $ 7,422,528 2036-2040

Page 84 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
YOL19405 Planned YOL City of Davis
G- System
Management,
Operations, and ITS Second Street Improvements (L Street to Mace Blvd) Multi-modal and traffic calming/safety improvements on Second Street between L Street and Mace Blvd. Includes Class IV bike lanes and/or two-way cycle track. $ 3,571,000 $ 5,301,170 2036-2040
YOL19431 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity 15th Street Modifications
Design, environmental clearance and construction for streetscape improvements on 15th Street between Jefferson Blvd. and South River Road.

The proposed improvement include pedestrian improvements, buffered bike lanes, and greenspace improvements $ 3,000,000 $ 4,034,666 2031-2035 YOL19433 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity 3rd and C Gateway Improvements
Design, environmental clearance, permitting and construction of streetscape improvements at and adjacent to the intersection of 3rd and C Streets in Washington. The improvements implement the streetscape improvements recommended by the Washington Realized: Sustainable Community Strategy for C Street, 3rd Street and the reconfigured 2nd Street south roadway. $ 1,500,000 $ 1,537,500 2020-2025 YOL19445 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity 5th Street/South River Road Reconfiguration (Phase 2) Design, environmental clearance and construction of the northern 4-lane section of South River Road in Pioneer Bluff to US 50. $ 3,000,000 $ 4,034,666 2031-2035 YOL19376 Planned YOL
City of West
Sacramento
C- Maintenance &
Rehabilitation Clarksburg Branch Line Trail and Bridge-Phase2 Construction of Bike Trail from River City High School to City Limits $ 2,000,000 $ 2,262,816 2020-2025 YOL19432 Planned YOL
City of West
Sacramento A- Bike & Ped
Clarksburg Branch Line Trail Extension and Jefferson Blvd Bridge Improvements
Construction of a joint-use flood protection O&M corridor and recreation trail along the eastern side of Jefferson Blvd. and southern side of the Stone Lock facility. Design, environmental clearance, and construction of a pedestrian and bike facility along the eastern side of Jefferson across the Jefferson Blvd. bascule bridge to Stone Blvd. $ 2,000,000 $ 2,000,000 2020-2025 YOL19434 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Enterprise Crossing
Amendment to feasibility study, complete design, environmental clearance and construction of a proposed joint flood-protection improvement and transportation connection linking Southport to the Port Industrial Complex. $ 125,000,000 $ 152,300,362 2026-2030 YOL15130
Project
Development Only YOL
City of West
Sacramento
B- Road & Highway
Capacity Harbor Blvd. Widening Harbor Blvd., West Capitol Ave. to Industrial: widen 4 to 6 lanes. $ 6,000,000 Post-2040 YOL19424 Planned YOL
City of West
Sacramento A- Bike & Ped I Street Bridge Deck Conversion Design, environmental clearance, permitting and construction of approaches and the upper deck for the I St Bridge. The improvements include construction/modification of the approaches for ADA compliance, resurfacing of the deck and other appurtenant circulation improvements. Civic spaces will be incorporated into the project. $ 13,000,000 $ 13,325,000 2020-2025 YOL19377 Planned YOL
City of West
Sacramento A- Bike & Ped I Street to Indian Heritage Bike Trail Construct Bike Trail under I Street Bridge and new C Street Bridge then continue atop levee to Indian Heritage Center $ 2,000,000 $ 2,050,000 2020-2025 YOL15891 Programmed YOL
City of West
Sacramento
B- Road & Highway
Capacity I-80 Enterprise Boulevard
In West Sacramento, I-80 at Enterprise Boulevard: construct eastbound onramp. $ 4,800,000 2020-2025 YOL15670 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity I-80/Reed Ave. Interchange
I-80 at Reed Ave. interchange: widen ramps at the intersection with Reed Avenue, widen Reed Avenue, and limit some local street access. Add ramp metering to the on-ramps. $ 12,350,000 $ 13,972,891 2020-2025 YOL15160
Project
Development Only YOL
City of West
Sacramento
B- Road & Highway
Capacity Industrial Boulevard Widening
In West Sacramento, Industrial Boulevard from the Palamidessi Bridge at the Barge Canal to Harbor Boulevard: widen from 4 to 6 lanes. $ 16,440,000 Post-2040 YOL19430 Planned YOL
City of West
Sacramento A- Bike & Ped Jefferson Streetscape Improvements Design and construction of streetscape improvements on Jefferson Blvd from 15th Street to Stone Blvd. The proposed enhancements include buffered bike lanes, on-street parking, and greenspace improvements. $ 2,000,000 $ 2,101,250 2020-2025 YOL15950 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Lake Washington Blvd. Bridge Widening
Lake Washington Blvd.: Widen the Palamidessi Bridge over the barge canal from 4 to 6 lanes. $ 10,100,000 $ 11,427,223 2020-2025
YOL15940
Project
Development Only YOL
City of West
Sacramento
B- Road & Highway
Capacity Lake Washington Blvd. Widening
Widen Lake Washington Blvd. from 2 to 6 lanes from Jefferson Blvd. to the new Palamidessi Bridge at the barge canal. $ 4,000,000 Post-2040

Page 85 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
YOL19428 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Locks Drive Modification and Extension
Design, environmental clearance and construction of the eastern extension of Locks Drive to Village Parkway. $ 4,000,000 $ 4,873,612 2026-2030 YOL19439 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Pioneer Bluff Districteast-west connections
Design, environmental clearance and construction of five new east-west local/collector roads in Pioneer Bluff. It is expected that one of the new roadway would include a signal on Jefferson Blvd. $ 30,000,000 $ 43,448,945 2031-2035 YOL19437 Planned YOL
City of West
Sacramento A- Bike & Ped Pioneer Bluff Riverfront Trail Design, evniromental clearance, permitting and construction of a joint-use flood protection O&M corridor and recreation trail along the Sacramento River in Pioneer Bluff. $ 2,000,000 $ 2,689,778 2031-2035
YOL19361 Planned YOL
City of West
Sacramento
G- System
Management,
Operations, and ITS Port of West Sacramento Entrance
This project includes the construction of a new port entrance, including the installation of a new rail crossing near Beacon and Industrial Boulevards. This project will increase the efficiency and safety of travel to, from and within the Port, and is required prior to the construction of a new area project. This project will improve transportation operations, and is likely to lead to significant positive economic benefits. $ 2,400,000 $ 3,475,916 2031-2035 YOL19426 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Rail Street Phase 1 Improvements
Design, environmental clearance amendment , and construction of the northern section of Rail Street. $ 4,000,000 $ 4,202,500 2020-2025 YOL19427 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Rail Street Phase 2 Improvements
Design, environmental clearance amendment , and construction of the southern section of Rail Street. $ 7,000,000 $ 9,414,222 2031-2035 YOL19385 Programmed YOL
City of West
Sacramento
B- Road & Highway
Capacity Riverfront Street Extension
Riverfront Street, from Mill Street to the existing 3-way intersection at 5th St., S. River Rd., and 15th St. (0.3 mi): Extend as a two-lane roadway with sidewalks, protected bicycle lanes, lighting, and landscaping. At existing 3-way intersection construct the new four-way intersection to include Riverfront St. extension. Also, 15th St., from Jefferson Blvd. to future 4-way intersection at River Rd., 5th St., and Riverfront St.: Realign roadway. $ 5,334,500 2020-2025 YOL19351 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Seaway Property Infrastructure
Construct internal roadway, utilities and storm drainage network for Port Property Development $ 5,000,000 $ 6,400,423 2026-2030
YOL19443 Planned YOL
City of West
Sacramento
D- Programs &
Planning
South Market Sacramento River Bike/Ped/Transit River Crossing at Locks Drive
Feasibility study, preliminary design and environmental clearance for a proposed bike, pedestrian, and (possible) transit bridge across the Sacramento River connecting West Sacramento's Central Park and Stone Lock District to Miller Park and the Sacramento Marina. $ 120,000,000 $ 173,795,780 2031-2035 YOL15180 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity South River Rd. Reconfiguration (Phase 3)
Reconstruct South River Road to 4-lanes from 15th Street to the 19th Street extension and restripe Village Parkway to Stonegate Boulevard, including restriping the 4-lane bridge from 2-lanes to 4-lanes over barge canal. $ 20,000,000 $ 28,965,963 2031-2035 YOL19444 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity South River Road Reconfiguration (Phase 1)
Design, environmental clearance and construction of the southern 4-lane section of South River Road in Pioneer Bluff from the Mike McGowan Bridge to the proposed future extension of 19th Street. $ 3,000,000 $ 3,151,875 2020-2025 YOL19435 Planned YOL
City of West
Sacramento A- Bike & Ped South River Road Trail Conversion Design, environmental clearance, permitting and constriction of trail waterward of South River connecting the Clarksburg Branch Line Trail extension to Village Pwky and an additional 800 feet to the east. The project also includes the reconfiguration of South River Road east of Village Pkwy to a bike/pedestrain trail on the crown of the setback levee to the Stonegate Drive extension $ 3,500,000 $ 4,480,296 2026-2030
YOL19442 Planned YOL
City of West
Sacramento A- Bike & Ped Southport Setback Levee Trails Design, enviromental clearance, permitting and construction of the a 10-mile trail loop connecting to the northern and southern ends with the Clarksburg Branch Line Trail, as well as connecting with existing and planned trails located along schools, parks, residences and shopping centers. The improvements include multiple trailhead access points, including ADA-compliant ramps, to the levee trail and trailhead features such as parking, lighting, and signage. $ 5,600,000 $ 6,335,886 2020-2025 YOL19446 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Stone Blvd Extension
Design, environmental clearance and construction for the eastern extension of Stone Blvd to South River Road in Pioneer Bluff. $ 4,000,000 $ 4,873,612 2026-2030

Page 86 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
YOL19436 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Stone Lock District Roads
Design, environmental cleatance and construction of collector and local roads that serve the development of the southern neighborhood of the Stone Lock Disitrct. $ 30,000,000 $ 40,346,665 2031-2035
YOL19425 Planned YOL
City of West
Sacramento A- Bike & Ped Stone Lock Ped/Bike Bridge
Design, environmental clearance and permitting for pedestrian and bike bridge across lockage canal between the navigation locks at the Stone Locks facility. $ 400,000 $ 537,956 2031-2035 YOL19429 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity Stonegate Drive Extension
Design, environmental clearance and construction of the eastern extension of Stonegate Drive including cycle track and trailhead features. $ 4,000,000 $ 4,873,612 2026-2030 YOL19386 Programmed YOL
City of West
Sacramento A- Bike & Ped Sycamore Park Phase 2 and 3 Bicycle and Pedestrian Overpass Sycamore Park, from Westmore Oaks School over US 50 connecting with Joey Lopes Park (phase 2) and from Westmore Oaks Elementary School to the intersection of Park Blvd. and Stone Blvd (phase 3): Construct a 1,500 foot concrete overpass. (Emission Benefits in kg/day: 0.02 ROG, 0.01 NOx, 0.01 PM2.5, 0.01 PM10) $ 7,868,010 2020-2025
YOL19440 Planned YOL
City of West
Sacramento A- Bike & Ped Sycamore Phase 4
Design, environmental clearance and construction of the southern extension and terminus of the Sycamore Trail. This phase would connect at Stone Blvd and include pedestrian crossing improvements across Stone Blvd and provide safe passage through the Barge Canal rail switching yard. Across the Barge Canal waterway a new bike/pedestrian bridge would be constructed and land at the future Arlington Oaks neighborhood park. The trail would continue along a converted Arlington Road and terminate at the intersection of Lake Washington Blvd and Jefferson Blvd. $ 4,300,000 $ 5,239,132 2026-2030 YOL19441 Planned YOL
City of West
Sacramento A- Bike & Ped Sycamore Phase 5
Design and construct a bicycle and pedestrian undercrossing on the UPRR and SNRR rail ROW from Rice Ave to Yolo Street. $ 6,000,000 $ 9,831,699 2036-2040 YOL15900 Planned YOL
City of West
Sacramento
B- Road & Highway
Capacity U.S. 50/Jefferson Blvd. Interchange
Jefferson Blvd interchange--expand the ramps and signals from 1 to 2 lanes, add ramp metering and turn lanes, and related street closures. $ 26,450,000 $ 38,307,487 2031-2035 YOL15680 Planned YOL
City of West
Sacramento
G- System
Management,
Operations, and ITS U.S. 50/South River Road
U.S. 50: Install ramp meters and modify ramp design at South River Rd interchange. $ 23,625,000 $ 28,784,768 2026-2030
YOL19284 Planned YOL
City of West
Sacramento A- Bike & Ped West Capitol Avenue Streetscape Improvements - Phase 3 In West Sacramento on West Capitol Avenue from Westacre Road to Sycamore Avenue, construction of streetscape improvements, including wider sidewalks, flatter road cross-section, reconfigure lanes, roundabout, utility relocation, new lighting, and substantial planting and hardscape treatments. $ 12,420,000 $ 17,987,863 2031-2035 YOL19285 Planned YOL
City of West
Sacramento A- Bike & Ped West Capitol Avenue Streetscape Improvements - Phase 4 In West Sacramento on West Capitol Avenue from Sycamore Avenue to Harbor Boulevard, construction of streetscape improvements, including wider sidewalks, flatter road cross-section, reconfigure lanes, utility relocation, new lighting, and substantial planting and hardscape treatments. $ 12,720,000 $ 18,422,353 2031-2035 YOL19288 Planned YOL
City of West
Sacramento F- Transit O&M (Rail) Yolo Rail Realignment Project Rail Relocation (Phase 2A) Design, environmental clearance, permitting and construction of the Yolo Rail Realignment Project, Phase 2A $ 70,000,000 $ 85,288,203 2026-2030 YOL19339 Planned YOL City of Winters A- Bike & Ped
Complete Streets Improvements Grant Ave/State Rte
128/Russell Blvd
Complete Streets Improvements Grant Ave/State Rte 128/Russell Blvd between El Rio Villa housing community and the city of Winters -pedestrian and bike improvements including overcrossing of Hwy 505 $ 20,919,000 $ 23,667,928 2020-2025 YOL19417 Planned YOL City of Woodland
B- Road & Highway
Capacity Abandon Harry Lorenzo Avenue Abandon existing road Harry Lorenzo Avenue from Parkland Avenue to CR 25A. $ 350,000 $ 350,000 2020-2025 YOL17550 Planned YOL City of Woodland
B- Road & Highway
Capacity County Rd. 102 Widening A Widen: 4 lanes from Gibson Rd. to Farmer's Central Road. $ 4,000,000 $ 6,554,466 2036-2040 YOL17330
Project
Development Only YOL City of Woodland
B- Road & Highway
Capacity County Rd. 102 Widening B
In Woodland, from Kentucky Ave to Beamer St, on CR102: widen from 2 to 4 lanes. $ 2,896,851 Post-2040
YOL17310 Planned YOL City of Woodland
B- Road & Highway
Capacity County Rd. 102 Widening C Widen: 4 lanes from Beamer St. to East Main St. $ 2,896,851 $ 4,746,828 2036-2040

Page 87 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
YOL19419 Planned YOL City of Woodland
B- Road & Highway
Capacity County Road 25A/SR 113 Interchange
This improvement consists of either:
1) Construct roundabouts at northbound and southbound ramp terminals and bypass lanes
2) The CR 25A/SR113 SB ramps intersection shall be modified to provide a traffic signal, widen intersection approaches to provide additional capacity, install a loop-on-ramp in the northwest quadrant of the interchange for westbound CR 25A to southbound SR 113 movements, and widen the CR 25A overpass of SR 113 to provide a second westbound through lane between the NB and SB ramp intersections. The SB Ramp intersection shall be widened to provide a southbound left turn lane and southbound right turn lane, an eastbound through lane and eastbound right turn lane, and a westbound through lane and a westbound right turn lane to feed the new loop-on ramp.

The northbound ramp intersection shall be modified to provide a traffic signal and intersection approach widening. The northbound ramp intersection shall be widened to provide a northbound left turn lane and two northbound right turn lanes, an eastbound left turn lane and a second westbound through lane and a westbound right turn lane.

This interchange improvement also includes widening CR 25A from the northbound ramp terminal to the SP-1A north/south road
$ 10,000,000 $ 11,314,082 2020-2025
YOL19305 Programmed YOL City of Woodland A- Bike & Ped East Main St. Improvements In the City of Woodland along East Main Street, from East Street to east of Pioneer Avenue. Construct sidewaks, 10-foot off-street bike path and associated landscape and irrigation, class II bike lanes and bus turnouts.

Project will also construct safety improvements to include medians, updated freeway and local street signage and lane striping changes to improve traffic flow near the freeway entrances/exits.. Toll Credits for ENG, CON $ 3,416,000 2020-2025 YOL19286 Planned YOL City of Woodland
C- Maintenance &
Rehabilitation I-5 / CR 102 Interchange (Phase 2)
Interchange Reconstruction: on I-5 at County Rd. 102 including overcrossing of I-5. $ 7,000,000 $ 11,470,315 2036-2040
YOL17420 Planned YOL City of Woodland
G- System
Management,
Operations, and ITS Main St.

Roadway Operational Improvements: from Ashley Ave. to Cottonwood St., construct south side improvements $ 360,000 $ 589,902 2036-2040 YOL19416 Planned YOL City of Woodland
B- Road & Highway
Capacity Marston Rd. Extension Construct New Road: 2 lane collector from SP1A N-S Road to Parkland Ave. $ 550,000 $ 704,046 2026-2030 YOL19413
Project
Development Only YOL City of Woodland
B- Road & Highway
Capacity Matmor Road Extension Construct New Road: 2 lane collector from Sports Park Drive to SP1 E-W Road $ 640,000 Post-2040 YOL19422
Project
Development Only YOL City of Woodland
B- Road & Highway
Capacity Maxwell Extension Construct New Road: 4 lane from Veterans to 700 ft. east of Veterans $ 1,500,000 Post-2040 YOL19287 Planned YOL City of Woodland
B- Road & Highway
Capacity New County Rd. 25A
Construct New Road: Project split into 2 phases: 2 lanes from Meikle to County Rd. 102 plus Parkland to Harry Lorenzo Ave(Currently getting built 2019) and Parkland to Meikle (Built in 2-3 years) $ 4,500,000 $ 4,727,813 2020-2025 YOL17360
Project
Development Only YOL City of Woodland
B- Road & Highway
Capacity Parkland Ave. Construct New Road: 2 lane arterial from Pioneer Ave. to East St. $ 9,044,751 Post-2040 YOL19415 Planned YOL City of Woodland
B- Road & Highway
Capacity SP1A N-S (Arterial)
Construct New Road: 2 lane arterial from County Road 24C to County Road 25A $ 750,000 $ 960,063 2026-2030
YOL19418
Project
Development Only YOL City of Woodland
B- Road & Highway
Capacity SP1B E-W Collector Construct New Road: 2 lane collector from East St. to Matmor Road. $ 540,000 Post-2040 YOL19528 Planned YOL City of Woodland
B- Road & Highway
Capacity CR 25A widening
Widen CR 25A from East Street to the southbound ramp terminal intersection from 2 lanes to 4 lanes $ 2,000,000 $ 3,277,233 2036-2040

Page 88 of 97 ends

2020 MTP/SCS Project List
ID Status (Planned,
Programmed or
Project
Development Only)
County Lead Agency Budget Category Title Description Total Project Cost (2018 dollars)
Year of Expenditure
Cost for planned
projects
Completion
Timing
VAR56140 Planned YOL
Multiple Lead
Agencies A- Bike & Ped Alternative Transportation Corridor- Davis to Woodland Class 1 bike/low speed electric vehicle path between Davis and Woodland, along alignment identified in September 2009 feasibility study. $ 10,000,000 $ 14,482,982 2031-2035 VAR56182 Planned YOL
Multiple Lead
Agencies
D- Programs &
Planning Yolo Regional Freight Rail Project
Feasibility Study for realighment of freright rail out of the cities of Davis, Woodland and West Sacramento to area east of Davis to create enhanced freight operations, remove safety issues in cities, to encourage redevelopment of communities and to improved regional flood contrrol $ 500,000 $ 819,308 2036-2040 YCT18198 Programmed YOL SACOG
E- Transit Capital
(Major)
Sacramento-West Sacramento Downtown/Riverfront Streetcar Project (Phase 1)
Construction of the Phase 1 of the Downtown/Riverfront Streetcar. The alignment runs from West Sacramento Civic Center/Riverfront Street to the Midtown entertainment, retail, and residential district of Sacramento. (Project Development programmed separately under VAR56127, for $14,570,000.) $ 194,000,000 2020-2025 YOL19293 Programmed YOL UC Davis
C- Maintenance &
Rehabilitation La Rue Ave. Bridge Replacement
On UC Davis Campus, La Rue Ave. (formerly California St.) over Putah Creek:

Replace functionally obsolete 2 lane bridge with 2 lane bridge including bike lanes and pedestrian access. $ 7,337,327 2020-2025
UNI10472 Programmed YOL Unitrans
E- Transit Capital
(Vehicles) Electric Vehicle Charging Infrastructure
Install 14 electric charging units and related equipment to facilitate the introduction of electric propulsion buses to the Unitrans bus fleet. $ 2,679,500 2020-2025 UNI10466 Programmed YOL Unitrans F- Transit O&M (Bus) Operating Assistance Operation, maintenance, administration, and program development for the provision of fixed route transit service within the City of Davis. Program development includes training and direct education expenses for employee development (pursuant to 2 CFR Part 200.472) in the areas of safety, security, and business administration. Davis Urbanized Area. FFY 2017 to FFY 2020 $ 30,688,566 2020-2025 UNI10469 Programmed YOL Unitrans
E- Transit Capital
(Vehicles) Rolling Stock Replacement
For Davis Community Transit, replace up to four paratransit vehicles plus related equipment (radios, fareboxes, etc). For Unitrans, purchase up to six standard 40-foot buses and three double-deck buses between FY 2017 and FY 2020 to replace existing buses when they have surpassed their useful lives plus related equipment (radios, fare boxes, security equipment, etc). (CMAQ Emission Reductions in kg/day: ROG 0.17, NOx 0.51, PM10 0.01, PM2.5 0.01) $ 10,951,219 2020-2025 UNI10465 Programmed YOL Unitrans
E- Transit Capital
(Minor) Unitrans Bus Stop Access and Passenger Amenties Implement various bus stop improvements, accessibility, and passenger amenities, including but not limited to installation, replacement, and repair of bus shelters/benches, passenger information displays, and passenger safety/security equipment. $ 550,000 2020-2025
UNI10471 Programmed YOL Unitrans
E- Transit Capital
(Minor) Unitrans Maintenance Facility Improvements
Perform repair and rehabilitation activities to maintain the Unitrans Maintenance Facility in a state of good repair, and replace operating equipment in the Maintenance Facility that has surpass their useful lives $ 7,400,000 2020-2025 UNI10467 Programmed YOL Unitrans
E- Transit Capital
(Minor) Unitrans Miscellaneous Capital Improvements for Ops Office, shop, operating equipment, facility, security enhancements, and nonrevenue vehicles for existing facilities. $ 525,000 2020-2025 YOL19249 Planned YOL Yolo County
C- Maintenance &
Rehabilitation County Rd. 99
Pavement Rehabilitation: from County Rd. 27 to County Road 25A. Includes:
bike lanes. $ 2,000,000 $ 3,277,233 2036-2040
YOL19371 Planned YOL Yolo County
G- System
Management,
Operations, and ITS County Road 102 Widening
Widen County Road 102 between Davis and Woodland. Project may be implemented in phases as funding allows. Turn pockets and center medians are highest priority. $ 12,600,000 $ 20,646,567 2036-2040 YOL19370 Planned YOL Yolo County
C- Maintenance &
Rehabilitation County Road 27
Roadway Safety Improvements: from County Road 89 to County Road 102.

Includes: pavement rehabilitation, paved shoulders & clear recovery zone. $ 38,000,000 $ 62,267,425 2036-2040 YOL19318 Programmed YOL Yolo County
C- Maintenance &
Rehabilitation CR 29 Bridge Replacement
CR 29 Over Dry Slough, 0.77 mi west of CR 98: Replace 2-lane bridge with a new 2-lane bridge. (Toll credits for PE, ROW, CON.). Toll Credits for ENG, ROW, CON $ 3,078,291 2020-2025
YOL18235 Programmed YOL Yolo County
C- Maintenance &
Rehabilitation CR 41 Bridge Replacement
CR 41, over Cache Creek, 500' east of SR 16: Replace existing deficient 2 lane bridge with new 2 lane bridge: (Toll credits for PE, ROW, & CON.). Toll Credits for ENG, ROW, CON $ 5,694,000 2020-2025

Page 89 of 97 ends