C. Contractor shall comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Construction General Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale.

Contractor shall comply with the lawful requirements of the City, and any other applicable municipality, drainage district, or other local agency with jurisdiction over the location where the Work is to be conducted, regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

D. Unless otherwise specified in the Special Conditions or other portion of the Contract Documents, the City has not prepared a Storm Water Pollution Prevention Plan (“SWPPP”) or other storm water compliance plan for the Project Site. Contractor shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage under the Construction General Permit. This includes filing all necessary documentation including the Permit Registration Documents (“PRDs”) through the Stormwater Multiple Applications and Report Tracking System (“SMARTS”); preparing and implementing a SWPPP for the Work site; implementing all other provisions, and monitoring and reporting requirements required by the Construction General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but not limited to preparation and submittal of all reports, plans, inspections, and monitoring information in compliance with the Construction General Permit. All submittals shall be coordinated with the City’s Legally Responsible Person and Authorized Signatory as those terms are defined in the Construction General Permit.

Before any NOI, PRD, SWPPP, or other Construction General Permit-related Packet Page. 752
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -38- 00 72 00 – GENERAL CONDITIONS document may be submitted to the State Water Board or implemented on the Project site, it must first be reviewed and approved by the City and/or City’s designee.

Contractor shall include all costs of compliance with specified requirements in the Contract Price.

E. The City retains the right to develop its own documentation for the Project site, including but not limited to the SWPPP, and in the alternative may require Contractor to adopt and implement portions of the City developed SWPPP. The City expressly reserves the right to procure coverage under the Construction General Permit for the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise fails to proceed in a manner that complies with the requirements of the Construction General Permit. The City additionally reserves the right to hire additional contractors to maintain compliance at the Work site. Whether Contractor has adequately maintained compliance with the Construction General Permit shall be the City’s sole determination. Any costs incurred by the City in procuring coverage under the Construction General Permit, or drafting and/or implementing a SWPPP for the Work site shall be paid by Contractor.

F. Notwithstanding the above, for those Work sites where construction activity results in the disturbance of less than one acre of total land area and/or do not need coverage under the Construction General Permit, the Contractor shall be responsible for preparing and implementing an Erosion and Sediment Control Plan in accordance with State Water Resources Control Board Order No. 2013-0001- DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.

G. Failure to comply with the Construction General Permit, laws, regulations, and ordinances listed in this Article is a violation of federal and state law.

Notwithstanding any other indemnity contained in these Contract Documents, Contractor agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, fees, costs, expenses, or losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances listed above, arising out of or in connection with the Work, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.

H. The City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy. Contractor hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and any relevant enforcement entity.

5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and local environmental rules and regulations. Any infractions of said rules and regulations by the Contractor during the term of the Contract, which result in penalties, will be the responsibility of the Contractor. The City operates under a number of environmental permits issued by various agencies. If due to an action, Packet Page. 753
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -39- 00 72 00 – GENERAL CONDITIONS inaction, or negligence by the Contractor, the City becomes subject to noncompliance penalties, the cost of such penalties shall be borne by the Contractor.

B. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.

Movement of crews and equipment within the rights-of-way and over routes provided for access to the Work shall be performed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original contours. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.

C. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the endangered plant or animal. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.

D. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor shall notify the construction/archeological monitor and/or the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the construction/archeological monitor and/or City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the cultural resource. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the City Representative and the construction/archeological monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor shall be principally Packet Page. 754
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -40- 00 72 00 – GENERAL CONDITIONS responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents.

5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by Cal/OSHA. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements.

B. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. Contractor shall complete and execute any certification forms required by the City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

5.14 Inspector’s Field Office.

A. If required by the City, the Contractor shall be responsible for providing the inspector’s field office. The office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, an ability to connect to the internet, and a fax machine at Contractor’s expense. The field office shall be provided within 20 Days of the Notice to Proceed.

B. A table satisfactory for the study of plans and two chairs shall be provided by Contractor. Contractor shall provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

Packet Page. 755
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -41- 00 72 00 – GENERAL CONDITIONS

5.15 Contractor’s Supervision.

A. Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project.

5.16 Workers.

A. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.

B. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project.

5.17 Independent Contractors.

A. Contractor shall be an independent contractor for the City and not an employee.

Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of the City and are not entitled to benefits of any kind normally provided employees of the City, including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.

5.18 Verification of Employment Eligibility.

A. By executing the Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub-subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of the Contractor or its Subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.

5.19 Labor.

A. Hours of Work

1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Packet Page. 756
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -42- 00 72 00 – GENERAL CONDITIONS Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided.

Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and onehalf times the basic rate of pay.

2. The Contractor and every Subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.

3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.

4. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to the City.

5. If Contractor gives notice of an inspection pursuant to the Contract Documents, the City will provide inspection during normal working hours from 7:00 a.m. to 3:30 p.m. Monday through Friday. Requested inspections before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two (2) Days’ notice for review and approval. Upon written request and approval the 8.5 hour working day may be changed to other limits subject to city/county ordinance.

6. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project Site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance

1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Packet Page. 757
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -43- 00 72 00 – GENERAL CONDITIONS Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require Subcontractor(s) to certify weekly payroll records under penalty of perjury.

2. In accordance with Labor Code section 1771.4, the Contractor and each Subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3. Any stop orders issued by the DIR against Contractor or any Subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Contractor or any Subcontractor.

4. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
a. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
b. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.

5. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.

6. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or performing the Contract shall not be marked or obliterated.

Packet Page. 758
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -44- 00 72 00 – GENERAL CONDITIONS

7. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such 10-day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payment then due.

8. The responsibility for compliance with this Article shall rest upon the Contractor.

C. Prevailing Rates of Wages

1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the City’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.

2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under the Contract by it or by any Subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.

3. Contractor shall post, at appropriate conspicuous points on the Project Site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.

D. Public Works Contractor Registration
Packet Page. 759
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -45- 00 72 00 – GENERAL CONDITIONS

1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its Subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR.

Contractor shall maintain a current registration for the duration of the Project.

Contractor shall further include the requirements of Labor Code sections 1725.5 and 1771.1 in any subcontract and ensure that all Subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

E. Employment of Apprentices

1. Contractor and all Subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices.

2. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non-compliance pursuant to Labor Code section 1777.7.

F. Nondiscrimination/Equal Employment Opportunity

1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.

G. Debarment of Contractors and Subcontractors

1. Contractors or Subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the City. The Contractor shall be responsible for the payment Packet Page. 760
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -46- 00 72 00 – GENERAL CONDITIONS of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

5.20 Subcontracts.

A. Contractor agrees to bind every Subcontractor to the terms of the Contract Documents as far as such terms are applicable to Subcontractor’s portion of the Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.

B. The City reserves the right to accept all subcontractors. The City’s acceptance of any Subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.

C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly and at other times as requested by Engineer or as required by progress of the Work.

The Contractor, City, and all Subcontractors active on the Site shall attend each meeting. Contractor may at its discretion request attendance by representatives of its Suppliers, manufacturers, and other Subcontractors. The City will preside at the progress meetings and will arrange for keeping and distributing the minutes. The purpose of the meetings is to review the progress of the Work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop. During each meeting, the Contractor shall present any issues which may impact its progress with a view to resolve these issues expeditiously.

5.22 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless otherwise specified in the Contract Documents), Contractor will prepare and deliver a Schedule of Submittals to the City that has been fully integrated with the progress schedule and identifies each Submittal required by the Contract Documents as well as the date on which Contractor will deliver each Submittal to the City. Each Submittal must be delivered to the City at least thirty (30) Days prior to the date the material or equipment is scheduled to be incorporated into the Work. The Contractor is responsible for any schedule delays resulting from the Submittal process.

B. Submittal Procedures.

1. Contractor will follow the following procedures for each Submittal, Shop Drawing and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.

Packet Page. 761
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -47- 00 72 00 – GENERAL CONDITIONS b. Transmittals will be sequentially numbered. Contractor to mark revised Submittals with original number and sequential alphabetic suffix. c. Each Submittal will identify the Project, Contractor, Subcontractor and Supplier, pertinent Drawing and detail number, and Specification Section number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved each Submittal, verified products required, field dimensions, adjacent construction Work, and that coordination of information is according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations that may differ and/or be detrimental to successful performance of completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address the City’s comments and resubmit. Contractor shall identify changes made since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called the City’s attention to such deviations at time of submission and the City has taken no exception to the deviation. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from incomplete Submittals are not the responsibility of the City. j. Contractor shall not be entitled to any extension of the Contract Times as a result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals unless otherwise specified in the Contract Documents.

2. Where a Submittal, Shop Drawing or Sample is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to the City review and approval of the pertinent submittal will be performed at the sole risk and expense and responsibility of Contractor.

C. Schedule Milestone for Submittals. Contractor must submit all Submittals required by the Contract Documents in accordance with the Schedule of Submittals. If Contractor fails to submit the Submittals in accordance with the Schedule of Submittals, Contractor will be solely liable for any delays or impacts caused by the delayed Submittal, whether direct or indirect. Contractor will be liable for the time calculated from the date the Submittal is due until the date a compliant Submittal is Packet Page. 762
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -48- 00 72 00 – GENERAL CONDITIONS made. A compliant Submittal will be one that is complete and satisfies the requirements of the Contract Documents.

5.23 Shop Drawings and Sample Submittal Procedures.

A. Before submitting each Shop Drawing or Sample, Contractor shall have:

1. Reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents;

2. Determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;

3. Determined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and

4. Determined and verified all information relative to Contractor’s responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.

B. With each Submittal, Contractor shall give the City specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawings or Sample Submittal and, in addition, a specific notation made on each Shop Drawing or Sample submitted to the City for review and approval of each such variation.

C. Shop Drawings.

1. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show the City the services, materials, and equipment Contractor proposes to provide and to enable the City to review the information for assessing conformance with information given and design concept expressed in Contract Documents.

2. When required by individual Specification sections, provide Shop Drawings signed and sealed by a professional engineer responsible for designing components shown on Shop Drawings. Shop Drawings must include signed and sealed calculations to support design in a form suitable for submission to and approval by authorities having jurisdiction.

3. Shop Drawings for steel structures shall consist of shop details, erection and other working Drawings showing details, dimensions, sizes of members and other information necessary for the complete fabrication and erection of the metal work.

4. Shop Drawings of concrete structures shall consist of such detailed drawings as may reasonably be required for the successful prosecution of the Work and which are not included in the Drawings furnished by the Engineer. These may include Packet Page. 763
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -49- 00 72 00 – GENERAL CONDITIONS drawings for false work, bracing, centering and form work, masonry layout diagrams, and diagrams for bent reinforcement.

5. Contractor shall make revisions and provide additional information when required by authorities having jurisdiction.

D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as required to enable the City to review the submittal for assessing conformance with information given and design concept expressed in Contract Documents. Samples should be of appropriate size and detail to assess functional, aesthetic, color, texture, patterns and finish selection.

E. City’s Review.

1. The City will review Shop Drawings and Samples in accordance with the Schedule of Submittals. The City’s review and acceptance will be only to determine if the items covered by the Submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents.

2. The City review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.

3. The City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless the City has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample.

F. Resubmittal Procedures. Contractor shall make corrections required by the City and shall return corrected Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by the City on previous Submittals.

5.24 Record (“As-Built”) Drawings.

A. The Contractor shall maintain one record set of Contract Documents at the Site or digitally in an acceptable format. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Drawings. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every 100 linear feet, and at each bend, recording both the horizontal and vertical Packet Page. 764
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -50- 00 72 00 – GENERAL CONDITIONS locations. Said Drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. Any required as-built drawings of civil engineering elements of the Work shall be prepared by a registered civil engineer.

B. These master Record Drawings of the as-built conditions, including all revisions made necessary by Addenda and Change Orders, shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes.

Notes shall identify relevant Change Orders by number and date. Record Drawings shall be accessible to the Engineer at all times during the construction period.

Failure on the Contractor’s part to keep Record Drawings current could result in withholding partial payment.

C. Upon completion of the Project and as a condition of final acceptance, the Contractor shall finalize and deliver a complete set of Record Drawings to the Engineers. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to the City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the Record Drawings.

D. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Record Drawings shall be included in Contractor’s bid and distributed in the Bid Schedule. No additional compensation shall be made to the Contractor for this Work.

5.25 Layout and Field Engineering.

A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Work performed.

5.26 Separate Contracts and Cooperation.

A. Separate Contracts. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the Work in place or discrepancies with the Contract Documents.

B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.

Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily Packet Page. 765
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -51- 00 72 00 – GENERAL CONDITIONS and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project Site.

5.27 Work Site.

A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-ofentry for the Work will be provided by the City. Unless otherwise specified in the Special Provisions, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the City harmless from all claims for damages caused by such actions. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Applicable Laws, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to City or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work.

B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to Applicable Laws. The Contractor shall furnish trash bins for all debris from construction. All debris shall be placed in trash bins daily. Forms and false-work that are to be re-used shall be stacked neatly concurrently with their removal. Forms and false-work that are not to be re-used shall be disposed of concurrently with their removal.

C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make it ready for utilization by the City. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.

5.28 Utility Usage.

A. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor.

Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on the Work where the utility is needed. Upon completion of the Work, Contractor shall remove all temporary distribution systems. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Work, including but not limited to startup and testing required in the Contract Documents. All permanent meters installed shall be listed in the Contractor’s name until the Work is accepted. For Work to be performed in existing City facilities, Contractor may use the City’s existing utilities, provided such use is reasonable under the circumstances. If Contractor uses the City utilities, it will not need to Packet Page. 766
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -52- 00 72 00 – GENERAL CONDITIONS compensate the City for reasonably consumption of utilities, but Contractor will be responsible for any excessive, unreasonable or wasteful utility usage. Amounts due the City under this section may be deducted from progress payments.

5.29 Protection of Work and Property.

A. The Contractor shall digitally record video and take photographs of the Project site and adjacent improvements in a manner and quality that clearly depicts the existing condition of the Project Site and adjacent improvements immediately prior to the start of Work (minimum 1080p video and 4MP photo). All videos and photographs shall be date and time stamped. The Contractor shall submit the video and photos in digital format on a memory stick before the commencement of Work, along with a map outlining the route and locations of the videos and/or photographs. The Contractor shall be responsible for all damages to persons or property that occur as a result of the Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final acceptance by the City. All Work shall be solely at the Contractor’s risk.

B. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.

C. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.

D. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:

1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.

2. Provide substantial barricades around any shrubs or trees indicated to be preserved.

3. Deliver materials to the Site over a route designated by the City.

4. Provide any and all dust control required and follow the applicable air quality regulations as appropriate. If the Contractor does not comply immediately with a notice from the City or a public agency responsible for air quality, the City shall have the authority to provide dust control and deduct the cost from payments to the Contractor.

Packet Page. 767
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -53- 00 72 00 – GENERAL CONDITIONS

5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the City.

Contractor shall not unreasonably encumber the Site with its materials.

6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the City, at no cost to the City.

7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.

8. Preserve and protect from injury all buildings, pole lines and all directional, warning and mileage signs that have been placed within the right-of-way.

9. At the completion of work each day, leave the Work and the Site in a clean, safe condition.

10. Comply with any stage construction and/or traffic handling plans. Access to residences and businesses shall be maintained at all times, except with the City’s written approval. Any request for approval to reduce or restrict access to residences and business must be submitted to the City at least seven (7) Days in advance, and the City may issue or withhold approval in its sole discretion.

E. These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the work involved in the protection and preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.

F. Should damage to persons or property occur as a result of the Work, Contractor shall promptly notify the City, in writing. Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

G. Contractor shall maintain all investigation documentation including video and/or photographs for a minimum of four (4) years following completion of the Project.

5.30 Emergencies.

A. In emergencies affecting the safety or protection of persons or the Work or Property at the Site or adjacent thereto, the Contractor, without special instruction or authorization from the City or the Engineer, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the Engineer prompt written notice if the Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby.

Packet Page. 768
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -54- 00 72 00 – GENERAL CONDITIONS ARTICLE 6 -MATERIALS; INSPECTION

6.1 Access to Work.

A. The City, Engineer, their consultants and other representatives and personnel, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs.

6.2 Materials.

A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities whatsoever necessary to execute and complete this Contract within the Contract Time. Unless otherwise specified, all materials, parts, and equipment furnished by the Contractor in the Work shall be new, the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.

B. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.

C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work. Materials shall be stored on the Project Site in such manner so as not to interfere with any operations of the City or any independent contractor.

D. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item overruns and underruns in accordance with the Contract Documents, no additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Schedule, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Engineer for consideration before proceeding with the Work.

6.3 Test and Inspections.

A. Inspection and Testing of Work and Materials
Packet Page. 769
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -55- 00 72 00 – GENERAL CONDITIONS

1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or approved, Contractor shall provide the Engineer at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection.

Required certificates of inspection (or similar) shall be secured by Contractor.

Costs for City testing and inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.

2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials testing technician that was called for by the Contractor but ultimately the Contractor work was not ready for the inspection. Any such costs shall be deducted from any amounts due to the Contractor.

3. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.

4. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor.

Unless otherwise stated and as provided by the Contract Documents, the City shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.

5. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

B. Testing of Materials

1. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work.

2. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.

3. Unless otherwise specified in the Special Provisions, all initial testing and a reasonable amount of retesting will be performed under the direction of the Engineer, and at no expense to the Contractor. The Contractor shall notify the Engineer in writing, at least 15 days in advance, of its intention to use materials for Packet Page. 770
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -56- 00 72 00 – GENERAL CONDITIONS which tests are specified, to allow sufficient time to perform the tests. The notice shall name the proposed supplier and source of material. If the notice of intent to use is sent before the materials are available for testing or inspection, or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor's responsibility to renotify the Engineer when samples which are representative may be obtained.

4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of any material or assembled material for which these Specifications so require or if so required by the Engineer. The Engineer may waive the materials testing requirements and accept a Certificate of Compliance. Material test data may be required by the Engineer to be included with the submittal. Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The submission of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material into the Work which conforms to the requirements of the Contract Documents, and any material not conforming to the requirements will be subject to rejection by the Engineer whether in place or not.

5. Copies of mill certificates of composition and quality of all component materials (reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of the Work shall be provided to the City at the time of delivery. City shall retain the right to reject any raw material not provided with a mill certificate at the time of delivery.

6. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the Work, and shall be removed from the Project Site all at the Contractor’s expense.

6.4 Requests for Substitutions.

A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referenced herein.

B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.

C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in Packet Page. 771
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -57- 00 72 00 – GENERAL CONDITIONS the Contract Documents. However, the City has adopted uniform standards for certain materials, processes, and articles.

D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than thirty-five (35) calendar days after award of Contract. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract. If a substitution request is rejected by the City, the Contractor shall provide the material, method or service specified herein. The City shall not be responsible for any costs incurred by the Contractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Engineer has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.

E. Substantiating data as described above shall include, at a minimum, the following information:

1. A signed affidavit from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the affidavit.

2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.

3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the contract.

4. Information detailing the durability and lifecycle costs of the proposed substitution.

F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Engineer is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.

G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.

H. The Contractor shall bear the costs of all the City work associated with the review of substitution requests.

I. If substitution requests approved by the Engineer require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.

Packet Page. 772
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -58- 00 72 00 – GENERAL CONDITIONS ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES

7.1 Soils Investigations.

A. When a soils investigation report for the Site is available, such report is provided for informational purposes only. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the Site before submitting its Bid and must make whatever tests it deems appropriate to determine the condition of the soil.

7.2 Ownership of Site Materials Found.

A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials developed or obtained in the excavation or other operations of Contractor or any of its Subcontractors in the performance of the Contract, and the right to use said items in carrying out the Contract, or to dispose of same, is hereby expressly reserved by the City. Neither Contractor nor any of its Subcontractors nor any of their representatives or employees shall have any right, title, or interest in said materials, nor shall they assert or make any claim thereto. Contractor will, as determined by the City’s Representative, be permitted to use in the Work without charge, any such materials which meet the requirements of the Contract Documents, provided the City shall have the right to use or consume these materials without payment to a third party.

7.3 Existence of Utilities at the Work Site.

A. Existing Utilities

1. The location of known existing utilities and pipelines are shown on the Plans in their approximate locations. However, nothing herein shall be deemed to require the City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the project can be inferred from the presence of other visible facilities, such as buildings, cleanouts, meter and junction boxes, on or adjacent to the Site of the Project.

2. The City will assume the responsibility for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the Project site if such utilities are not identified by the City in the Contract Documents or which cannot reasonably be inferred from the presence of other visible facilities.

B. Utility Location

1. It shall be the Contractor’s responsibility to determine the exact location and depth of all utilities, including service connections, which have been marked by the respective utility owners and which the Contractor believes may affect or be affected by the Contractor’s operations. The Contractor shall not be entitled to additional compensation nor time extensions for work necessary to avoid Packet Page. 773
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -59- 00 72 00 – GENERAL CONDITIONS interferences nor for repair to damaged utilities if the Contractor does not expose all such existing utilities as required by this Article.

2. The locating of utilities shall be in conformance with Government Code Section 4216 et seq. except for the City’s utilities located on the City’s property and not on public right-of-way.

3. A “High Priority Subsurface Installation” is defined in Government Code Section 4216 (j) as “high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig) or greater than six inches nominal pipe diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.”

4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as “any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized drain lines.”

5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the appropriate regional notification center at least two (2) working days but not more than 14 Days before performing any excavation. The date of the notification shall not count as part of the two-working-day notice. Before notifying the appropriate regional notification center, the Contractor shall delineate the area to be excavated. The Contractor shall request that the utility owners conduct a utility survey and mark or otherwise indicate the location of their service. The Contractor shall furnish to the Engineer written documentation of its contact(s) with the regional notification center prior to commencing excavation at such locations.

6. After the utility survey is completed, the Contractor shall commence “potholing” or hand digging to determine the actual location of the pipe, duct, or conduit and in accordance with Government Code Section 4216.4 if the excavation within the “tolerance zone” of a subsurface installation. The Engineer shall be given notice prior to commencing potholing operations. The Contractor shall uncover all piping and conduits, to a point one (1) foot below the pipe, where crossings, interferences, or connections are shown on the Drawings, prior to trenching or excavating for any pipe or structures, to determine actual elevations. New pipelines shall be laid to such grade as to clear all existing facilities, which are to remain in service for any period subsequent to the construction of the run of pipe involved.

7. The Contractor's attention is directed to the requirements of Government Code Section 4216.2 (c) which provides: “When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the Packet Page. 774
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -60- 00 72 00 – GENERAL CONDITIONS information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.” The Contractor shall notify the Engineer in advance of this meeting.

C. Utility Relocation and Repair

1. If interferences occur at locations other than those indicated in the Contract Documents with reasonable accuracy, the Contractor shall notify the Engineer in writing. The Engineer will supply a method for correcting said interferences in accordance with the responsibilities of this section and Government Code Section 4215. To the extent any delay is caused thereby, Contractor shall submit a notice of delay within five (5) Days of discovery of the circumstances giving rise to the delay in accordance with Article 9.1 Change Orders and Time Extensions.

2. Care shall be exercised by the Contractor to prevent damage to adjacent existing facilities and public or private works; where equipment will pass over these obstructions, suitable planking shall be placed. If high priority subsurface installations are damaged and the operator cannot be contacted, the Contractor shall call 911 emergency services.

3. The City will compensate the Contractor for the costs of locating and repairing damage not due to the failure of the Contractor to exercise reasonable care, and for removing or relocating such main or trunk line utility facilities not indicated in the Contract Documents with reasonable accuracy, and for the cost of equipment on the Project necessarily idled during such work. The payment for such costs will be made as provided in Article 9.1 Change Orders and Time Extensions. The Contractor shall not be assessed liquidated damages for delay in completion of the Project, when such delay is caused by the failure of the City or utility company to provide for removal or relocation of such utility facilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for Completion and Liquidated Damages.

4. The public utility, where it is the owner of the affected utility, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. The right is reserved to the City and the owners of utilities or their authorized agents to enter upon the Work area for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties.

The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such forces and shall allow the respective utilities time to relocate their facility.

5. When the Contract Documents indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utility company and the work will be done at no cost to the Contractor, unless otherwise stipulated in the Contract Documents.

Packet Page. 775
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -61- 00 72 00 – GENERAL CONDITIONS

6. Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor’s responsibility and it shall make arrangements and bear all costs for such work.

D. Construction at Existing Utilities

1. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.

2. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the City Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify City as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to property resulting from the negligent, accidental, or intentional breaching of utilities.

3. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this work, shall be included in Contractor’s bid and distributed in the schedule of pay Items. No additional compensation shall be made to the Contractor for this work.

7.4 Trenches
A. Trenches Five Feet or More in Depth.

1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Engineer.

Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.

B. Excavations Deeper than Four Feet.

Packet Page. 776
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -62- 00 72 00 – GENERAL CONDITIONS

1. If the Work involves excavating trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly within three (3) Days, and before the excavation is further disturbed, notify the City in writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those indicated.
c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.

2. The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a Change Order under the procedures described in Article

9.1 Change Orders and Time Extensions.

3. In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

ARTICLE 8 -PROSECUTION OF THE WORK

8.1 Contractor’s Means and Methods.

A. Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

8.2 Construction Schedule.

A. General Requirements. The schedule shall be prepared in a Critical Path Method (“CPM”) format and in an electronic scheduling program acceptable to the City and as specified in the Contract Documents. Contractor shall deliver the schedule and all updates to the City in both paper and electronic form. The electronic versions shall be in the format and include all data used to prepare the schedule. Copies are not acceptable.

B. Schedule. The receipt or approval of any schedules by the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Packet Page. 777
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -63- 00 72 00 – GENERAL CONDITIONS Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project.

Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract Time. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the City.

C. Schedule Contents. The schedule shall allow enough time for inclement weather.

The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include appropriate time allowances and constraints for submittals, items of interface with Work performed by others, and specified construction, start-up and performance tests. All float shall be owned by the Project. Schedules indicating early or late completion shall not modify or have any effect on the Contract Time, regardless of whether the schedules are reviewed and/or accepted by the City. For purposes of determining Liquidated Damages, the Contract Time shall control and may only be altered by a duly authorized Change Order.

D. Schedule Updates. Contractor shall continuously update its construction schedule.

Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule; (2) with each progress payment request; and (3) whenever requested to do so by the City. The City may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule. Upon the City’s request, Contractor shall submit any schedules or updates to the City in the native electronic format of the software used to create the schedule. Contractor shall also submit schedules showing a two-week detailed look-ahead at weekly meetings conducted with the City. The two-week lookahead schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Work within the Contract Time, and it shall clearly state the number of staff to be used on each daily segment of the Work.

E. Acceptance. Acceptance of the schedules by the City will not impose on responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or compliance with the Contract Documents. Acceptance will not interfere with or relieve Contractor from Contractor’s full responsibility therefor.

F. Recovery Schedule.

1. Should any of the following conditions exist, City may require Contractor to prepare, at no extra cost to City, a plan of action and a recovery schedule for completing the Work and achieving all contractual milestones within the allotted Contract Time:

Packet Page. 778
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -64- 00 72 00 – GENERAL CONDITIONS a. The Contractor's monthly progress report indicates delays that are, in the opinion of City, of sufficient magnitude that City questions the Contractor's ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration of future activities of the schedule which, in the opinion of City, are major in nature.

2. The recovery schedule shall include proposed revisions to the Construction Schedule, demonstrating how Contractor intends to achieve all contractual milestones including Contract completion within the allotted Contract Time. The submittal shall include a narrative describing the actions planned by the Contractor to recover the schedule.

3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s request. If Contractor asserts that City is responsible for the delay, failure to submit the recovery schedule within seven (7) Days of City’s request, will be considered a concurrent delay event attributable to Contractor, and Contractor shall only be entitled to non-compensable adjustments to Contract Times. If Contractor is responsible for the delay, this provision will not limit or affect Contractor's liability and failure to submit the recovery schedule with seven (7) Days of City’s request may result in City withholding progress payments or other amounts due under the Contract Documents.

4. Contractor is responsible for all costs associated with the preparation and execution of the recovery schedule, including any necessary recovery actions, which may include, but are not limited to, assignment of additional labor, and/or equipment, shift or overtime work, expediting of submittals or deliveries, overlapping of activities or sequencing changes to increase activity concurrence.

Regardless of whether City directs Contractor to prepare a recovery schedule pursuant to this Section, Contractor shall promptly undertake appropriate action at no additional cost to City to recover the schedule whenever the current construction schedule shows that the Contractor will not achieve a milestone and/or complete the Work within the allotted Contract Time.

8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract for Construction shall commence: (1) on the date stated in the Notice to Proceed, or (2) if the Notice to Proceed does not specify a commencement date, then on the date of the Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float. Contractor shall not be entitled to compensation, and the City will not compensate Contractor, Packet Page. 779
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -65- 00 72 00 – GENERAL CONDITIONS for delays which impact early completion. Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date.

B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is understood that the City will suffer damage. In accordance with Government Code section 53069.85 and Public Contract Code section 7102, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.

C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule. Contractor shall not be entitled to reverse liquidated damages for time extensions resulting from inclement weather.

D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is limited to a City-caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. Contractor shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its Subcontractors or Suppliers). The City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Contractor shall not be entitled to an adjustment in the Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.

E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102, Contractor will be compensated for damages incurred due to unreasonable delays to the critical path for which the City is responsible. The parties agree that determining Contractor’s exact delay damages are and will continue to be impracticable and extremely difficult. As such, for each calendar day in excess of the time for completion set forth in Article 2 of the Contract for Construction, the City shall pay to the Contractor the sum stipulated in the Contract per day. Such amount shall constitute the only payment allowed for any City-caused delays and shall necessarily include all overhead, all profits, all administrative costs, all bond costs, all labor, materials, equipment and rental costs and any other costs, expenses and fees incurred or sustained as a result of such delays. Contractor shall not be entitled to reverse liquidated damages for any change in the Work in which Contractor is compensated for overhead and profit through a change in Unit Price Work or a Change Order resulting in a lump sum or allowed mark-up for the additional Work.

The amount of reverse liquidated damages shall be reduced by Contractor’s concurrent delays.

Packet Page. 780
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -66- 00 72 00 – GENERAL CONDITIONS F. Force Majeure. In accordance with subparagraphs “D” and “E” above, the Contractor shall not be charged liquidated damages, and the City shall not be responsible, for any delays resulting from a Force Majeure Event. If a delay to the critical path results from a Force Majeure Event, the Contractor will be entitled to a time extension but will not receive an adjustment to the Contract Price or any other compensation. Such a non-compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays.

G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled to any extension of time or any reverse liquidated damages unless Contractor properly notices the delay and adjustment to compensation and requests a Change Order in accordance with Article 9.1 Change Orders and Time Extensions.

Contractor’s failure to timely and fully comply with the Change Order procedures in the Contract Documents shall constitute a waiver of Contractor’s right to a time extension or reverse liquidated damages.

8.4 Contractor’s Responsibility for Work.

A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be under the charge and care of the Contractor. The Contractor shall take every necessary precaution against injury or damage to any part thereof by the action of the elements or from any cause whether arising from the execution or non-execution of the Work. The Contractor shall rebuild, repair, restore and make good at its own expense all injuries or damages to any portion of the Work before its completion and acceptance. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City will pay for repair or restoration to damaged Work in excess of 5% of the total Bid.

8.5 Occupancy.

A. The City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California, Contractor may request the City to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the City to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City or with Packet Page. 781
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -67- 00 72 00 – GENERAL CONDITIONS a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.

8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City

1. The City may, at its sole option, decide to suspend at any time the performance of all or any portion of the Work by notice in writing to Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension.

Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.

2. Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise:
a. Immediately discontinue Work on the date and to the extent specified in the notice;
b. Place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent required in the notice;
c. Promptly make every reasonable effort to obtain suspension upon terms satisfactory to the City’s Representative of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and
d. Continue to protect and maintain the Work including those portions on which Work has been suspended.

3. Except as provided by this Article, as full and complete compensation for such suspension, Contractor shall be granted an adjustment in the Contract Price based on a negotiated daily rate that reflects the Contractor’s actual costs associated with the demobilized condition of the Site and an extension of the Contract Times equal to the number of days performance of Work is suspended; provided, however, that no adjustment of Contract Price or extension of Contract Times shall be granted if the suspension results from Contractor's non-compliance with the requirements of the Contract.

B. Termination for Cause by the City:

1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or Packet Page. 782
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -68- 00 72 00 – GENERAL CONDITIONS the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the City may serve written notice upon the Contractor and its surety of the City's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the Contractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) Days unless such violations have ceased and arrangements satisfactory to the City have been made for correction of said violations.

2. After expiration of the ten (10) Day period, the City may terminate the Contract by providing a Notice of Termination to the Contractor. The City may take over and complete the Work by any method it may deem appropriate, including enforcement of the Project performance bond. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Work. If the City takes over the Work, the City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Site.

3. Upon termination, Contractor shall not be entitled to receive any further payment from the City, except for Work which was duly performed prior to the effective date of the Notice of Termination. Contractor shall submit an invoice for final payment within thirty (30) Days of the effective date of the Notice of Termination. The City may withhold from final payment up to 150% of any disputed amounts, including any amounts which may be necessary to repair defective Work, complete unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its duties under the Contract.

C. Termination for Convenience by the City:

1. The City may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, upon ten (10) Days written notice if the City determines that a termination is in the City's interest.

2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of the City, the extent of termination, and the effective date of such termination.

3. After receipt of Notice of Termination, and except as directed by the City's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this termination for convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Packet Page. 783
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -69- 00 72 00 – GENERAL CONDITIONS Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the effective date of the Notice of Termination, all of the usual documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the effective date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 Days after the effective date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.” If the City rejects any costs, Contractor shall be deemed to waive the rejected costs unless Contractor files a Claim within thirty (30) Days of the rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable under this Article, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits. The provisions in this Article are in addition to and not in limitation of any other rights or remedies available to the City.

4. Termination of the Contract shall not relieve surety of its obligation for any just claims arising out of or relating to the Work performed.

5. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

6. If the City terminates Contractor for cause, and if it is later determined that the termination was wrongful, such default termination shall automatically be converted to and treated as a termination for convenience. In such event, Contractor shall be entitled to receive only the amounts payable under this section, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits.

Packet Page. 784
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -70- 00 72 00 – GENERAL CONDITIONS

8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is complete, the Engineer will promptly make a final inspection with the City and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.

B. Final Acceptance. The acceptance of the Work on behalf of the City will be made by the Engineer. Such acceptance by the City shall not constitute a waiver of defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, Record Documents, and other documents required by the Contract Documents, the City shall execute a Notice of Completion, constituting final acceptance and completion of the Project, except as may be expressly noted.

8.9 Warranty and Guaranty of Work.

A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the City, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year (or as otherwise indicated in the Contract Documents or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) from the date of the Notice of Completion of the Project without any expense whatever to the City, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.

B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the above-mentioned conditions within ten (10) Days after being notified in writing of required repairs, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole Packet Page. 785
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -71- 00 72 00 – GENERAL CONDITIONS expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder immediately upon demand.

C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City all warranties that would be given in normal commercial practice and assign to the City any and all manufacturer’s or installer’s warranties for equipment or materials not manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the City with all warranty and guarantee documents prior to final acceptance of the Project by the City as required.

D. When specifically indicated in the Contract Documents or when directed by the Engineer, the City may furnish materials or products to the Contractor for installation.

In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the City for installation by the Contractor to be voided or reduced, Contractor shall indemnify the City from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the City for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.

E. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.

F. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect or damage, the City shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.

G. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition.

H. Acceptance of Defective Work.

1. If, instead of requiring correction or removal and replacement of defective Work, the City prefers to accept it, the City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to the City’s evaluation of and determination to accept such defective Work and for the diminished value of the Work. If any acceptance of Defective Work occurs prior to release of the Project retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and the City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by the City. If the acceptance of defective occurs after release of the Project retention, an appropriate amount will be paid by Contractor to the City.

Packet Page. 786
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -72- 00 72 00 – GENERAL CONDITIONS I. The City May Correct Defective Work

1. If Contractor fails within a reasonable time after written notice from the City to correct Defective Work, or to remove and replace rejected Work as required by the City, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, the City may, after seven (7) Days written notice to Contractor, correct, or remedy any such deficiency.

2. In connection with such corrective or remedial action, the City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which the City has paid Contractor but which are stored elsewhere. Contractor shall allow the City, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable the City to exercise the rights and remedies to correct the Defective Work.

3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by the City correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the City shall be entitled to an appropriate decrease in the Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of defective Work.

4. If the Change Order is executed after all payments under the Contract have been paid by the City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to the City. If the Change Order is executed after release of the Project retention, an appropriate amount will be paid by Contractor to the City. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the City correcting Defective Work.

J. Nothing in the warranty or in the Contract Documents shall be construed to limit the rights and remedies available to the City at law or in equity, including, but not limited to, Code of Civil Procedure section 337.15.

ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION

9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be through a written Change Order in accordance with this Article. The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and Packet Page. 787
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -73- 00 72 00 – GENERAL CONDITIONS Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed with performance of the Work, including Additional Work, promptly and expeditiously.

Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.

A. Change in Contract Procedures

1. City Directive. The City may direct changes in the Work by delivering a written directive. To the extent the work directive results in a change to compensation or time, Contractor must timely request a Change Order and comply with all Change Order procedures in accordance with this Article. Notwithstanding issuance of a work directive, Contractor’s failure to timely request a Change Order shall constitute a waiver by Contractor of any adjustment to compensation or time extension for Work performed under the directive. The City shall not be liable to Contractor for Work performed or omitted by Contractor in reliance on verbal orders.

2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change Order Request, then Contractor shall provide the City with written notice of the underlying facts and circumstances that gave rise to the proposed change within the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days from the discovery date or prior to the alterations of the conditions, whichever is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the conditions, which shall be no longer than three (3) days from the date the Contractor discovers that the Force Majeure Event gives rise to a change, unless that the conditions are such that notice within three (3) days is not possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time or the Contract Price, within seven (7) days from the discovery date.

To be considered valid and complete, the notice of change/delay shall include a general statement of the circumstances giving rise to the notice of change/delay and a reasonable order of magnitude estimate of the additional costs and/or time. If the circumstances give rise to both a cost adjustment and time extension, Contractor shall submit the notice of change and notice of delay concurrently.

3. Request for Change in Compensation and/or Extension of Time. Contractor shall submit a Change Order Request for any adjustment to Contractor’s compensation Packet Page. 788
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -74- 00 72 00 – GENERAL CONDITIONS and/or any extension of time. The Change Order Request shall be made prior to incurring any expense and within fourteen (14) Days from either Contractor’s notice of change/delay or the City’s directive ordering the change. The Change Order Request shall include all of the following information (unless inapplicable to the change):
a. A detailed description of the circumstances giving rise to the request;
b. A complete itemized cost proposal, including itemized pricing for first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical path to completion;
e. If any added costs or information cannot be determined at the time of the Change Order Request, the reason the costs or information cannot be determined at the time; and
f. Certification to the accuracy of the Change Order Request under penalty of perjury.

The time impact analysis shall be in the critical path method format and shall show the sequencing of all critical and non-critical new activities and/or activity revisions affected by the delay, with logic ties to all affected existing activities noted on the schedule.

The City may demand, and Contractor shall provide, any additional information supporting the Change Order Request, including but not limited to native electronic format version of schedules and time impact analyses. Contractor shall provide the requested additional information within five (5) Days of the request.

For any costs or information that cannot be determined at the time Contractor submits the Change Order Request, Contractor shall submit to the City notice of the costs or information and all supporting documentation within five (5) Days of when the costs or other information become subject to determination.

4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the Change Order Request or disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate price and/or time extension. If no agreement can be reached, the City shall have the right to order the Work performed on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City shall also have the right to order changes in the Work to be performed promptly by the Contractor on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or Packet Page. 789
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -75- 00 72 00 – GENERAL CONDITIONS savings in costs and time attributable to the extra or deleted work. The City’s determination shall become final and binding if the Contractor fails to submit a Claim in writing to the City within fourteen (14) Days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order and providing such supporting documentation for its position as the City may reasonably require.

5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE

A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE

ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF

THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE

RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH

CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE

OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY

MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY

OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.

Contractor recognizes and acknowledges that timely submission of a formal written notice of change/delay and Change Order Request, whether or not the circumstances of the change may be known to the City or available to the City through other means, is not a mere formality but is of crucial importance to the ability of the City to promptly identify, prioritize, evaluate and mitigate the potential effects of changes. Any form of informal notice, whether verbal or written (including, without limitation, statements in requests for information, statements in Submittals, statements at any job meeting or entries on monthly reports, daily logs or job meeting minutes), that does not strictly comply with the formal requirements of this Article, shall accordingly be insufficient.

6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in compensation or extension of time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change Orders. If so designated, Contractor may only use such forms. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No Claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights.

B. Determining Adjustments to Compensation.

1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work subject to a Change Order except as expressly set forth in this Article. The markPacket Page. 790 CONNECTOR PIPE SCREEN (CPS) PHASE 3 -76- 00 72 00 – GENERAL CONDITIONS up added in instances of Additional Work shall constitute the entire amount of profit, any mark-ups, any field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such Work.

2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item varies from the Bid Schedule, compensation for the change in quantity will be calculated by multiplying the actual quantity by the unit price. This calculation may result in either an additive or deductive Change Order. Bid items included on the Bid Schedule may be deducted from the Work in their entirety without any negotiated extra costs. Because Unit Price Work includes overhead and profit as determined by Contractor at the time of its Bid submission, no mark up or deduction for overhead and profit will be allowed.

3. Lump Sum Change Orders. Whenever possible, any changes affecting compensation shall be in a lump sum mutually agreed by the Contractor and the City.

4. Time and Materials Change Orders. The City may direct the Contractor to proceed with the Additional Work with payment to be made on the basis of actual cost of the labor and materials required to complete the Additional Work. If the Project is federally funded, a time and materials Change Order shall only be issued after a determination that no other Change Order is suitable and the Change Order shall include a ceiling price that the Contractor exceeds at its own risk.

5. Federally Funded Projects. For any change in price to the Contract, general and administrative expenses shall be negotiated and must conform to the cost principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be negotiated as a separate element of the cost. To establish a fair and reasonable profit, consideration must be given to the complexity of the Additional Work to be performed, the risk borne by the Contractor, the Contractor's investment, the amount of subcontracting, the quality of its record of past performance, and industry profit rates in the surrounding geographical area for similar work.

6. Allowed Costs. Estimates for lump sum quotations and accounting for time-andmaterial work shall be limited to direct expenditures necessitated specifically by the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from federal, state or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.

Packet Page. 791
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -77- 00 72 00 – GENERAL CONDITIONS b. Materials. The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed.

The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each items of equipment shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of $1,000 or less.
(i) The rental time to be paid for equipment shall be the time the equipment is in productive operation on the Additional Work being performed.

Rental time will not be allowed while equipment is inoperative due to breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used. Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer. (iii) Before construction equipment is used on any Additional Work, the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City, in duplicate, a description of the equipment and its identifying number. (iv) When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be 1/2-hour of operation, and any part of an hour greater than 30 minutes will be considered one hour of operation. When daily rates are listed, any part of a day less than 4 hours operation shall be considered to be 1/2-day of operation. d. Allowed Mark-up. The allowed mark-up for any and all overhead (including supervision and home and field office costs) and profit on work added to the Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and Subcontractors at cost only, without mark-up.

Contractor shall provide the City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up shall not exceed fifteen (15%) percent of labor costs, ten percent (10%) Packet Page. 792
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -78- 00 72 00 – GENERAL CONDITIONS of material costs, and ten percent (10%) of the cost of tools and equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost of the Work to which the Contractor may add up to five percent (5%) of the Subcontractor’s Net Cost.
(iv) For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the subsubcontractor’s Net Cost for Work to which the Subcontractor and Contractor may each add up to an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by the City exceed twenty-five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the City’s for an approval signature each day that Work is performed on a time-and-material basis. The Engineer’s signature on time sheets only serves as verification that the Work was performed and is not indicative of the City’s agreement to Contractor’s entitlement to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet, which shall include total actual costs, within five (5) Days following completion of Additional Work on a time-and-material basis.

Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and any other costs, along with documentation supporting the costs.

Contractor’s failure to submit the T&M Summary Sheet within five (5) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by the Contractor’s mark-up, shall not be allowed costs and shall not be included in any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing Packet Page. 793
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -79- 00 72 00 – GENERAL CONDITIONS and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch offices;
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of Claims;
(vii) Anticipated Lost Profits. Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny, burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work.
(x) Other. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents; including but not limited to: submittals, drawings, field drawings, shop drawings, including submissions of drawings; field inspection; general superintendence; computer services; reproduction services; salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial services; small tools, incidentals and consumables; temporary on-site facilities (offices, telephones, high speed internet access, plumbing, electrical power, lighting; platforms, fencing, water); surveying; estimating; protection of work; handling and Packet Page. 794
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -80- 00 72 00 – GENERAL CONDITIONS disposal fees; final cleanup; other incidental work; related warranties; insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally funded, any costs that are not allowable, reasonable and allocable to the Project, under generally accepted accounting principles and the applicable federal requirements.

9.2 Procedure for Resolving Claims.

Contractor shall timely comply with any and all requirement of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the time for completion or Contractor’s compensation, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.

A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code.

This Article shall be construed to be consistent with all applicable law, including but not limited to these statutes.

B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor for:

1. An adjustment to the time for completion including, without limitation, for relief from damages or penalties for delay assessed by the City;

2. Payment by the City of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or

3. An amount the payment of which is disputed by the City.

A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a Change Order, or otherwise failed to follow any procedures contained in the Contract Documents.

C. Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes any and all requirements of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, and Contractor’s request for a change has been denied in whole or in part.

Claims governed by this Article must be filed no later than thirty (30) Days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include Packet Page. 795
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -81- 00 72 00 – GENERAL CONDITIONS on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The Claim shall include the all information and documents necessary to substantiate the Claim, including but not limited to those identified below. Nothing in this Article is intended to extend the time limit or supersede notice requirements otherwise provided by Contract Documents. Failure to follow such contractual requirements shall bar any Claims or subsequent proceedings for compensation or payment thereon.

D. Documentation. The Contractor shall submit all Claims in the following format:

1. Summary description of Claim including basis of entitlement, merit and amount of time or money requested, with specific reference to the Contract Document provisions pursuant to which the Claim is made

2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other

3. Chronology of events and correspondence

4. Narrative analysis of Claim merit

5. Analysis of Claim cost, including calculations and supporting documents

6. Time impact analysis in the form required by the Contract Documents or, if the Contract Documents do not require a particular format, CPM format, if an adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 Days, shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 Days after the City issues its written statement.

1. If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim, and the City’s governing body does not meet within the 45 Days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three (3) Days following the next duly publicly noticed meeting of the City’s governing body after the 45-Day period, or extension, expires to provide the Packet Page. 796
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -82- 00 72 00 – GENERAL CONDITIONS Contractor a written statement identifying the disputed portion and the undisputed portion.

2. Within 30 Days of receipt of a Claim, the City may request in writing additional documentation supporting the Claim or relating to defenses or Claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the City and the Contractor. The City’s written response to the Claim, as further documented, shall be submitted to the Contractor within 30 Days (if the Claim is less than $50,000, within 15 Days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

F. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 Days of receipt of the City’s response or within 15 Days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 Days for settlement of the dispute.

G. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 Days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The public entity and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the Claim has been identified in writing, unless the parties agree to select a mediator at a later time.

1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

2. For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.

3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

Packet Page. 797
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -83- 00 72 00 – GENERAL CONDITIONS

4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved Claims shall be considered jointly in a single mediation, unless a new unrelated Claim arises after mediation is completed.

H. Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a Claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.

For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Contractor submits his or her written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.

I. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:

1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

J. Government Code Claim Procedures.

1. This Article does not apply to tort claims and nothing in this Article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commending with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the Government Code.

2. In addition to any and all requirements of the Contract Documents pertaining to notices of and requests for adjustment to the Contract Time, Contract Price, or Packet Page. 798
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -84- 00 72 00 – GENERAL CONDITIONS compensation or payment for Additional Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City.

3. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to adjustment of the Contract Time or Contract Price for Additional Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If Contractor does not comply with the Government Code claim procedure or the prerequisite contractual requirements, Contractor may not file any action against the City.

4. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved Claims known to Contractor or that should reasonably by known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.

K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the Claim being deemed rejected in its entirety, and shall not constitute a waiver of any rights under this Article.

ARTICLE 10 - MEASUREMENT; PAYMENT

10.1 Cost Breakdown.

A. Lump Sum Work.

1. Contractor shall furnish on forms approved by the City within ten (10) Days of the Notice to Proceed, a schedule of values allocating the entire Contract Price to the various portions of the Work and prepared in such a form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule of values, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor’s applications for payment. Contractor shall submit the schedule of values prior to submitting its first application for payment, and the City will not issue any payment until it receives and approves the schedule of values.

B. Unit Price Work.

1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work multiplied by the estimated quantity of each item as indicated in the Contract. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s overhead and or profit for each separately identified item.

Packet Page. 799
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -85- 00 72 00 – GENERAL CONDITIONS

2. Unless otherwise specified, payment will be based on the actual quantities of Work as verified and approved by the Engineer, based on the price per unit as set forth in the Bid.

3. The City or Contractor may initiate a Change Order or Change Order Request to adjust the Contract Price in accordance with Contractor Documents based on actual quantities of Unit Price Work. The City or Contractor may make a claim for an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor differs by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit price as a result of having incurred additional expense or the City believes that the City is entitled to a decrease in unit price and the parties are unable to agree as to the amount of any such increase or decrease.

10.2 Progress Estimates and Payment.

A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to Engineer a payment request which shall set forth in detail the value of the Work done for the period beginning with the date Work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid. Contractor shall include any amount earned for authorized Additional Work. Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

B. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified in the Notice Inviting Bids. From the remainder a further deduction may be made in accordance with Section C below.

The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request.

C. The City may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in its judgment may be necessary to cover:

1. Payments which may be past due and payable for just claims against Contractor or any Subcontractors for labor or materials furnished in and about the performance of work on the Project under this Contract.

2. Defective work not remedied.

3. Failure of Contractor to make proper payments to his Subcontractor or for material or labor.

Packet Page. 800
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -86- 00 72 00 – GENERAL CONDITIONS

4. Completion of the Contract if there is a reasonable doubt that the Work can be completed for balance then unpaid.

5. Damage to another contractor or a third party.

6. Amounts which may be due the Count for claims against Contractor.

7. Failure of Contractor to keep the Record Drawings up to date.

8. Failure to provide update on construction schedule as required herein.

9. Site cleanup.

10. Failure to comply with Contract Documents.

11. Liquidated damages.

12. Legally permitted penalties.

D. The City may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of this Article, which must be retained or applied in accordance with applicable law. In so doing, the City shall be deemed the agent of Contractor and any payment so made by the City shall be considered as a payment made under contract by the City to Contractor and the City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The City will render Contractor a proper accounting of such funds disbursed on behalf of Contractor.

E. Upon receipt, the Engineer shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) Days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The City shall make the progress payment within 30 Days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8132. The number of days available to the City to make a payment without incurring interest pursuant to this paragraph shall be reduced by the number of Days by which the Engineer exceeds the seven (7) Day requirement.

F. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the City.

G. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

Packet Page. 801
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -87- 00 72 00 – GENERAL CONDITIONS

10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request. The City shall have the right to adjust any estimate of quantity and to correct any error made in any estimate for payment.

B. When the Work has been accepted there shall be paid to Contractor a sum equal to the Contract Price less any amounts previously paid Contractor and less any amounts withheld by the City from Contractor under the terms of the Contract. The final five percent (5%), or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of substantially complete, shall not become due and payable until as required by Public Contract Code section 7107. If the Contractor has placed securities with the City as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the Contract Price less any amounts due the City under the terms of the Contract.

C. Unless Contractor advises the City in writing prior to acceptance of the final five percent (5%) or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of completion, or the return of securities held as described herein, said acceptance shall operate as a release to the City of all claims and all liability to Contractor for all things done or furnished in connection with this Work and for every act of negligence of the City and for all other claims relating to or arising out of this Work. If Contractor advises the City in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the City may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the City with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this Contract.

D. In case of suspension of the Contract any unpaid balance shall be and become the sole and absolute property of the City to the extent necessary to repay the City any excess in the cost of the Work above the Contract Price.

E. Final payment shall be made no later than 60 Days after the date of acceptance of the Work by the City or the date of occupation, beneficial use and enjoyment of the Work by the City including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8136.

In the event of a dispute between the City and the Contractor, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.

F. Within ten (10) Days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its Subcontractors from whom retention has been withheld each Subcontractor’s share of the retention received. However, if a retention payment received by Contractor is specifically designated for a particular Subcontractor, payment of the retention shall be made to Packet Page. 802
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -88- 00 72 00 – GENERAL CONDITIONS the designated Subcontractor if the payment is consistent with the terms of the subcontract.

ARTICLE 11 - MISCELLANEOUS

11.1 Patents.

A. Contractor shall hold and save the City, officials, officers, employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this Contract.

11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.

B. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City.

C. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

11.3 Notice.

A. All notices shall be in writing and either served by personal delivery or mailed to the other party. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to the City shall be addressed to the City as designated in the Notice Inviting Bids unless the City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract.

The City is entitled to recover reasonable costs incurred in providing such notification.

11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against Packet Page. 803
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -89- 00 72 00 – GENERAL CONDITIONS contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the City. Any assignment or change of Contractor’s name of legal entity without the written consent of the City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

11.7 Change In Name And Nature Of Contractor’s Legal Entity.

A. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect the City’s rights under the Contract, including but not limited to the bonds.

11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall be governed by the law of the State of California excluding any choice of law provisions.

11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of San Bernardino County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.

Packet Page. 804
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -90- 00 72 00 – GENERAL CONDITIONS

11.11 Cumulative Remedies.

A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Applicable Laws, by special warranty or guarantee, or by other provisions of the Contract Documents.

The provisions of this Article will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.

11.12 Survival of Obligations.

A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.

11.13 Headings.

A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions.

11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor and Subcontractors must conform to the following requirements:

1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract.

2. This assignment must be made and become effective at the time the awarding body tenders to Contractor, without further acknowledgment by the parties.

11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify City in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in Work. If Contractor performs any Work knowing it to be contrary to such laws, Packet Page. 805
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -91- 00 72 00 – GENERAL CONDITIONS ordinances, rules and regulations, and without such notice to City, he shall bear all costs arising therefrom.

B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.

C. Contractor acknowledges and understands that, pursuant to Public Contract Code section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code section 2717(b) in order to supply mined material for this Contract.

D. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Work, shall be or become directly or indirectly interested financially in the Contract.

E. All provisions of law required to be inserted in the Contract or Contract Documents pursuant to any Applicable Laws shall be and are inserted herein. If through mistake, neglect, oversight, or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Contract or Contract Documents shall be changed by City, at no increase in Contract Price or extension in Contract Times, so as to strictly comply with the Applicable Laws and without prejudice to the rights of either party hereunder

11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature ARTICLE 12 -– FLEET COMPLIANCE

12.1 To the extent applicable, Contractor, shall comply, and shall ensure all subcontractors comply, with all requirements of the most current version of the California Air Resources Board (“CARB”) including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).

12.2 Throughout Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and subcontractors’ fleet including, without limitation, the CRCs, fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

12.3 Contractor shall be solely liable for any and all costs associated with complying with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized Packet Page. 806
CONNECTOR PIPE SCREEN (CPS) PHASE 3 -92- 00 72 00 – GENERAL CONDITIONS volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.

Packet Page. 807
CONNECTOR PIPE SCREEN (CPS) PHASE 3 93 00 73 13 - SPECIAL CONDITIONS 00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 -SCOPE OF WORK

1.1 Location of the Project.

A. Various Catch Basin locations throughout the City of San Bernardino.

1.2 Scope of Work.

A. The Scope of Work consists of the construction of Connector Pipe Screens (CPS), including but not limited to cleaning existing catch basins and installing connector pipe screens per project plans and specifications.

1. ARTICLE 2 -MODIFICATIONS TO THE GENERAL CONDITIONS
See Technical Specifications, Configuration Standards, and Tables provided in appendices.

END OF SPECIAL CONDITIONS
Packet Page. 808
CONNECTOR PIPE SCREEN (CPS) PHASE 3 94 APPENDICES
APPENDIX “A”

TECHNICAL SPECIFICATIONS
"THE FOLLOWING SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:

Packet Page. 809
CONNECTOR PIPE SCREEN (CPS) PHASE 3 95 APPENDICES

TECHNICAL SPECIFICATIONS-CONNECTOR PIPE SCREEN (CPS)
PART 1.00 SCOPE
The Connector Pipe Screen (CPS) prevents trash and debris from entering the storm drain system during dry weather and moderate storm flows by keeping the trash and debris inside the catch basin.

1.1 Submittals
The City of San Bernardino Public Works Department shall be provided with engineering details or standardized shop drawings of the CPS device and, when specified, utilize these drawings for approval. Drawings shall be annotated to indicate overall physical dimensions (WXLXH), all materials to be used, design assumptions and performance characteristics.

1.2 Manufacturer
The manufacturer of said system shall have been regularly engaged in the engineering design and production of systems for physical treatment of stormwater runoff for a minimum of 3-years and shall have greater than five-hundred (500) installation in two or more municipalities. The CPS shall be supplied by only Companies that have certified devices that are approved by the State Water Resources Control Board. [See Appendix C (Table 1- LIST OF CERTIFIED FULL CAPTURE DEVICES)].

PART 2.00 PRODUCT DETAILS
The CPS shall be designed to retain all trash larger than 5 mm (0.197 inches) in the catch basin, and shall comply with the following items:

1. The CPS shall be sized, fabricated and installed conforming to the configurations shown in the CPS Sizing Table found in Appendix C (Appendix B/TABLE 1).

2. The CPS unit shall have a sufficient structural integrity to withstand a lateral force of standing water (62.4 lb/ft3 ).

3. The CPS shall be configured with deflector plates or screens preventing trash from falling between the screen and connector pipe. The deflector plate shall be designed to withstand a vertical load of 10 lbs. per square foot within the catch basin area when the screen becomes 100% clogged. The CPS unit shall be bolted to the catch basin walls.

4. The gap at the bottom, sides, and joints of the CPS unit shall not exceed 5 mm (0.197 inches).

5. The perimeter of the CPS shall include a structural frame for stiffness, a bolting surface to fasten the CPS to the wall of the catch basin, and support for the upper portion of the CPS unit referred to as the "bypass".

Packet Page. 810
CONNECTOR PIPE SCREEN (CPS) PHASE 3 96 APPENDICES

6. All parts/components of the CPS unit must be sized to fit through the catch basin's manhole opening.

7. The CPS frame shall be fabricated from S-304 stainless steel, or an Agency approved equal stainless steel alloy. The Structural members shall have a minimum thickness of 3/16 inches.

8. The CPS screen shall be fabricated from perforated metal of Type S-304 stainless steel, or an Agency approved equal stainless steel alloy. The screen shall have a minimum thickness of fourteen (14) gauge (0.0781 inches). The geometrical opening shape shall have a diameter of 5mm (0.197 inches).

9. The screen material used shall have at least 45% open area.

10. Any edge of the CPS that is not flush with the wall or floor of the catch basin shall be smooth with no prongs or jagged edges.

11. The assembly bolts, screws, nuts, and washers shall be fabricated entirely from S-316 stainless steel. The concrete anchor bolts shall use a Red Head Multi-Set II drop-in anchor, SSRM-38, with Type 316 stainless steel threaded rods, nuts and washers, or Agency approved equal.

PART 3.00 INSTALLATIONS and PRE-CLEANING

3.1 Preliminary Measurement
Detailed measurements of each catch basin, including the size and location of the connector pipe, shall be performed for the proper fabrication of the devices by the Contractor. Written records of measurements and photos will be kept on file with the City Engineer for review and approval prior to fabrication of the CPS units.

3.2 Cleaning of Existing Catch Basins
Prior to commencing with installation, (preferably as part of the Catch Basin Sizing Survey), the catch basin structure shall be pre-cleaned such that it is free from obstructions and gross pollutants.

3.3 Method of Removal
All trash and debris required to be removed from the catch basins shall be removed according to industry standards. No trash or debris shall be allowed to enter the connector pipe or main line as a result of the cleanout operations.

3.4 Debris Disposal
Packet Page. 811
CONNECTOR PIPE SCREEN (CPS) PHASE 3 97 APPENDICES
Material removed from the drain will be disposed of according to Municipal standards. The appropriate SB City Animal Care and Control Agency will be contacted for pickup and disposal of dead animal and the Contractor shall be responsible for removing any dead animal from inside a catch basin.

Stormwater Connector Pipe Screen
PART 1 – GENERAL 01.01.00
Purpose
The purpose of this specification is to establish generally acceptable criteria for Connector Pipe Screens used for collecting trash and debris inside catch basins. It is intended to serve as a guide to producers, distributors, architects, engineers, contractors, plumbers, installers, inspectors, agencies and users; to promote understanding regarding materials, manufacture and installation; and to provide for identification of devices complying with this specification.

01.02.00 Description
Stormwater Connector Pipe Screens (CPS) are used to prevent trash and debris from entering the stormwater system during dry weather and moderate storm flows by keeping the trash inside the catch basin. The CPS is a screen placed permanently or temporarily in a catch basin at the location of the outlet pipe. The screen separates trash and debris from stormwater treatment flows. Flows that exceed the treatment flow rate bypass over the top of the screen. When the outlet pipe is located below a curb opening the CPS features a lid to prevent debris from passing behind the screen and flowing directly to the outlet pipe.

The CPS shall be designed to retain all trash larger than 5 mm (0.197 inches) in the catch basin.

01.03.00 Manufacturer
The manufacturer of the CPS shall be one that is regularly engaged in the engineering, design and production of systems developed for the treatment of stormwater runoff for at least (10) years, and which has a history of successful production, acceptable to the engineer of work. In accordance with the drawings, the CPS(s) shall be a screen device manufactured by (See Appendix C: Table 1- LIST OF CERTIFIED FULL CAPTURE DEVICES).

01.04.00 Submittals

01.04.01 Submittal drawings will be provided with each order to the contractor and engineer of work.

01.04.02 Submittal drawings are to detail the CPS, its components and the sequence for installation, including: • CPS configuration with primary dimensions • Various CPS components • Any accessory equipment

01.04.03 Inspection and maintenance documentation submitted upon request.

01.05.00 Work Included
Packet Page. 812
CONNECTOR PIPE SCREEN (CPS) PHASE 3 98 APPENDICES

01.05.01 Specification requirements for the installation of CPS.

01.05.02 Manufacturer to supply CPS(s):
• Screen • Mounting hardware • Bypass lid with supports (when required) PART 2 – COMPONENTS

02.01.01 The CPS shall have a sufficient structural integrity to withstand a lateral force of standing water within the catch basin area when the screen becomes 100% clogged. The CPS unit shall be bolted to the catch basin walls.

02.01.02 The CPS shall be configured with deflector plates or screens preventing trash from falling between the screen and connector pipe. The deflector plate shall be designed to withstand a vertical load.

02.01.03 The gap at the bottom, sides, and joints of the CPS unit shall not exceed 5 mm (0.197 inches).

02.01.04 The CPS shall include vertical structural stiffeners extending the full length of the screen in the form as bends in the screen itself, a bolting surface to fasten the CPS to the wall of the catch basin, and support for the upper portion of the CPS unit referred to as the “bypass.”

02.01.05 All parts/components of the CPS unit must be sized to fit through the catch basin’s manhole opening.

02.01.06 The CPS frame shall be fabricated from 304 stainless steel.

02.01.07 The CPS screen shall be fabricated from perforated 304 stainless steel. The screen shall have a minimum thickness of 16 gauge. The geometrical opening shape shall have a diameter of 5 mm (0.197 inches).

02.01.08 The screen material used shall have at least 45% open area.

02.01.09 Any edge of the CPS that is not flush with the wall or floor of the catch basin shall be smooth with no prongs or jagged edges.

02.01.10 The assembly bolts, screws, nuts, and washers shall be fabricated entirely from 316 stainless steel. The concrete anchor bolts shall use a wedge anchor, with Type 316 stainless steel threaded rods, nuts, and washers.

PART 3 – PERFORMANCE 03.01.00
General

03.01.01 Function -
Packet Page. 813
CONNECTOR PIPE SCREEN (CPS) PHASE 3 99 APPENDICES
The CPS has no moving internal components and functions based on gravity flow, unless otherwise specified. Stormwater runoff enters the catch basin through a curb opening and flows toward the connector pipe. The CPS is placed to intercept flows prior to exiting the catch basin through the connector pipe. The CPS must be able to be removed through the catch basin opening.

Stormwater flow up to the peak treatment rate is processed through the screen. Flows in excess of the peak treatment rate will overtop the screen in a bypass. The lid (when required) shall be place high enough above the screen to allow for full bypass flow.

03.01.02 Pollutants - The CPS will remove and retain trash and debris larger than 5 mm in diameter entering the catch basin during frequent storm events and specified flow rates.

03.01.03 Treatment Flow Rate - The CPS operates through gravity flow. The CPS is to be sized so the screen is capable of passing the calculated project specific water quality flow rate per local standards. All treatment flow rates must include a 50% screen clogging factor.

03.01.04 Bypass Flow Rate – The CPS is designed to fit within the catch basin in a way not to affect the existing hydraulics and treat or bypass all flows. The bypass must be sized with a surface area greater than the outlet pipe size, thus the CPS shall not be a critical point of flow restriction.

PART 4 - EXECUTION

04.01.00 General The installation and use of the CPS shall conform to all applicable national, state, municipal and local specifications.

04.02.00 Installation The contractor shall furnish all labor, equipment, materials and incidentals required to install the CPS device(s) and appurtenances in accordance with the drawings, installation manual, and these specifications, and be inspected and approved by the local governing agency. Any damage to catch basin and surrounding infrastructure caused by the installation of the CPS is the responsibility of the installation contractor.

04.02.01 CPS and all components or accessories shall be inserted through the catch basin and properly secured per manufactures installation manual and these specifications.

04.03.00 Shipping, Storage and Handling

04.03.01 Shipping – CPS shall be shipped to the contractor’s address and is the responsibility of the contractor to transport the unit(s) to the exact site of installation.

04.03.02 Storage and Handling– The contractor shall exercise care in the storage and handling of the CPS(s) and its components prior to and during installation. Any repair or replacement costs associated with events occurring after delivery is accepted, and unloading has commenced shall be borne by the contractor.

The CPS(s) and its components shall always be stored indoors and transported inside the original shipping container(s) until the CPS(s) are ready to be installed. The CPS shall always be handled with care and lifted according to OSHA and NIOSA lifting recommendations and/or contractor’s workplace safety professional recommendations.

Packet Page. 814
CONNECTOR PIPE SCREEN (CPS) PHASE 3 100 APPENDICES

04.04.00 Maintenance and Inspection

04.04.01 Inspection – After installation, the contractor shall demonstrate that the CPS has been properly installed at the correct location(s), elevations, and with appropriate supports and fasteners. All components associated with the CPS and its installation shall be subject to inspection by the engineer of work, governing agency, and the manufacture at the place of installation.

In addition, the contractor shall demonstrate that the CPS has been installed per the manufacturer’s specifications and recommendations.

CPS(s) shall be physically inspected regularly in accordance to manufacture’s recommendations.

An inspection record shall be kept by the inspection operator. The record shall include the condition of the CPS and its appurtenances. The most current copy of the inspection record shall always be copied and given to City.

04.04.02 Maintenance – The maintenance shall be performed by someone qualified. A Maintenance Manual is available upon request from the manufacturer. A detailed Maintenance Record shall be kept by the maintenance operator.

The Maintenance Record shall include any maintenance activities preformed, amount and description of debris collected, and the condition of the CPS. The most current copy of the Maintenance Record shall always be copied and placed with the governing agency. Upon cleaning: no trash or debris shall be located in the catch basin, on top of the bypass lid, or between the screen; no vegetation shall block the catch basin opening or connector pipe; and no trash or debris shall be located within the catch basin opening.

04.04.03 Material Disposal - All debris, trash, organics, and sediments captured and removed from the CPS shall be transported and disposed of at an approved facility for disposal in accordance with local and state regulations. Please refer to state and local regulations for the proper disposal of toxic and nontoxic material.

PART 5 – QUALITY ASSURANCE 05.01.00 Warranty The manufacturer shall guarantee the CPS against all manufacturing defects in materials and workmanship for period of (3) years from the date of delivery to the contractor. The manufacturer shall be notified of repair or replacement issues in writing within the warranty period. The CPS is limited to recommended application for which it was designed
Connector Pipe Screen (CPS) Requirements. The CPS prevents trash and debris from entering the storm drain system during dry weather and moderate storm flows by keeping the trash and debris inside the catch basin. The CPS shall be designed to retain all trash larger than 5 mm (0.197 inches) in the catch basin, and shall comply with the following items:

1. The CPS shall be sized, fabricated and installed conforming to the configurations shown in Appendix C: the CPS Sizing Table 1, Appendix I/Appendices A-1, A-2, A-3, and A-4.

2. The CPS shall not interfere with the operation of an existing or proposed ARS.

Packet Page. 815
CONNECTOR PIPE SCREEN (CPS) PHASE 3 101 APPENDICES

3. The CPS unit shall have a sufficient structural integrity to withstand a lateral force of standing water (62.4 lb/ft3 ) within the catch basin area when the screen becomes 100% clogged. The CPS unit shall be bolted to the catch basin walls.

4. The CPS shall be configured with deflector plates or screens preventing trash from falling between the screen and connector pipe. The deflector plate shall be designed to withstand a vertical load of 10 lbs per square foot.

5. The gap at the bottom, sides, and joints of the CPS unit shall not exceed 5mm (0.197 inches).

6. The perimeter of the CPS shall include a structural frame for stiffness, a bolting surface to fasten the CPS to the wall of the catch basin, and support for the upper portion of the CPS unit referred to as the"bypass" (see Appendix C: Appendix A-1).

7. All parts/components of the CPS unit must be sized to fit through the catch basin's manhole opening.

8. When the CPS unit encroaches more than 4 inches into the manhole opening, the Contractor shall install a Removable CPS unit. The Removable CPS unit shall be designed and installed with a removable panel allowing access into the catch basin. The removable panel shall be easily disengaged from the rest of CPS assembly upon entry or from the outside of the catch basin. The Contractor shall submit shop drawings for review and approval of the Agency. It is the responsibility of the Contractor to field verify the location (with longitude and latitude in degrees, and minutes/ decimals) and dimensions of these basins.

9. The CPS frame shall be fabricated from S-304 stainless steel, or an Agency approved equal stainless steel alloy. The Structural members shall have a minimum thickness of 3/16 inches.

10. The CPS screen shall be fabricated from perforated metal of Type S-304 stainless steel, or an Agency approved equal stainless steel alloy. The screen shall have a minimum thickness of fourteen (14) gauge (0.0781 inches) The geometrical opening shape shall have a diameter of 5mm (0.197 inches). Appendix I (cont.)

11. The screen material used shall have at least 45% open area.

12. Any edge of the CPS that is not flush with the wall or floor of the catch basin shall be smooth with no prongs or jagged edges.

13. The assembly bolts, screws, nuts, and washers shall be fabricated entirely from S-316 stainless steel. The concrete anchor bolts shall use a Red Head Multi-Set II drop-in anchor, SSRM-38, with Type 316 stainless steel threaded rods, nuts and washers, or Agency approved equal.

Packet Page. 816
CONNECTOR PIPE SCREEN (CPS) PHASE 3 102 APPENDICES
Preliminary Measurement. The Contractor shall make detailed measurements of each catch basin, including the size and location of the connector pipe, for the proper fabrication of the devices. The Contractor shall submit written records of its measurements to the City of San Bernardino Public Works Department for review and approval prior to fabrication of the CPS units. Improper fabrication of devices due to errors in the measurements shall be corrected at the Contractor's expense.

Cleaning of Existing Catch Basins. The Contractor shall furnish all materials, equipment, tools and labor to cleanout (i.e. remove and dispose of all debris from within and around) all catch basins in which retrofit devices will be installed under this Contract to the maintenance standards specified. Cleanout shall also include the catch basin connector pipe openings and the first 6 feet thereof. The catch basin shall be clean at the time of the installation of the retrofit device. Any trash and debris that accumulates between the dates the catch basin is cleaned and the date the device will be installed shall be removed prior to installation of the device at the Contractor's expense.

Maintenance Conditions and Maintenance Standards. Following are deficiencies in maintenance conditions and their corresponding maintenance standards which shall apply to this Contract. The cleanout of each catch basin shall meet the maintenance standards listed as follows:

Description of Maintenance Condition Deficiency Description of Maintenance Standard

1. Trash and debris located immediately in front of curb opening or side opening of catch basin, and on top or between metal grates of grated catch basin. No trash and debris located immediately in front of catch basin opening, and on top or between metal grates.

2. Vegetation growing across and/or blocking the basin opening. No vegetation blocking catch basin opening.

3. Trash and debris in the basin. No trash and debris within the catch basin.

4. Trash and debris in the connector pipe opening, upstream or downstream. No trash and debris in connector pipe opening and/or in the connector pipe for a distance of 6 feet from the opening. Attachment A-1(cont.) Trash and debris shall include, but is not limited to, mud, vegetation, and garbage. Upon completion of a cleanout operation at a catch basin and before leaving it, the Contractor shall sweep the top surface of the catch basin and the area 2 feet around the basin, and shall remove any trash and debris resulting from the cleanout operations. No debris is to be left at a catch basin for future pick-up.

Method of Removal. All trash and debris required to be removed from the catch basins shall be removed in a manner to be determined by the Contractor. The Contractor shall not allow any trash or debris to enter the connector pipe or main line as a result of the cleanout operations.

Packet Page. 817
CONNECTOR PIPE SCREEN (CPS) PHASE 3 103 APPENDICES
Debris Disposal. All trash and debris removed under this Contract shall become the property of the Contractor and shall be legally disposed of away from the basin sites. The Contractor is responsible for proper disposal of the trash and debris, including obtaining approvals from all jurisdictional agencies, as applicable. The contractor shall contact SB City Animal Care and Control for pickup and disposal of dead animals. However, the Contractor shall be responsible for removing any dead animal from inside a catch basin.

The Contractor shall also be responsible for contacting and coordinating with SB City Animal Care and Control.

Staff Gauge. The contractor shall paint a staff gauge per Appendix B: Appendix A-2 and A4. The staff gauge shall be located such that it is visible through the curb opening or grating of the catch basin.

Packet Page. 818
CONNECTOR PIPE SCREEN (CPS) PHASE 3 104 APPENDICES
APPENDIX “B”

CERTIFIED FULL CAPTURE SYSTEM CONFIGURATION

STANDARDS/TABLES
Packet Page. 819
CONNECTOR PIPE SCREEN (CPS) PHASE 3 105 APPENDICES
Packet Page. 820
CONNECTOR PIPE SCREEN (CPS) PHASE 3 106 APPENDICES
Packet Page. 821
CONNECTOR PIPE SCREEN (CPS) PHASE 3 107 APPENDICES
Packet Page. 822
CONNECTOR PIPE SCREEN (CPS) PHASE 3 108 APPENDICES
Packet Page. 823
CONNECTOR PIPE SCREEN (CPS) PHASE 3 109 APPENDICES
Packet Page. 824
CONNECTOR PIPE SCREEN (CPS) PHASE 3 110 APPENDICES
Packet Page. 825
CONNECTOR PIPE SCREEN (CPS) PHASE 3 111 APPENDICES
Packet Page. 826
CONNECTOR PIPE SCREEN (CPS) PHASE 3 112 APPENDICES
Packet Page. 827
CONNECTOR PIPE SCREEN (CPS) PHASE 3 113 APPENDICES
Packet Page. 828
CONNECTOR PIPE SCREEN (CPS) PHASE 3 114 APPENDICES
Packet Page. 829
CONNECTOR PIPE SCREEN (CPS) PHASE 3 115 APPENDICES
Packet Page. 830
CONNECTOR PIPE SCREEN (CPS) PHASE 3 116 APPENDICES
Packet Page. 831
CONNECTOR PIPE SCREEN (CPS) PHASE 3 117 APPENDICES
APPENDIX “C”

CATCH BASIN LOCATIONS
Packet Page. 832
CONNECTOR PIPE SCREEN (CPS) PHASE 3 118 APPENDICES
Packet Page. 833
CONNECTOR PIPE SCREEN (CPS) PHASE 3 119 APPENDICES
Packet Page. 834
CONNECTOR PIPE SCREEN (CPS) PHASE 3 120 APPENDICES
Packet Page. 835
CONNECTOR PIPE SCREEN (CPS) PHASE 3 121 APPENDICES
APPENDIX “D”

CITY OF SAN BERNARDINO

BUSINESS REGISTRATION CERTIFICATE APPLICATION FORM
Packet Page. 836
CONNECTOR PIPE SCREEN (CPS) PHASE 3 122 APPENDICES
Packet Page. 837
Quantity Unit Unit Price Total Price Unit Price Total Price

1.1 Furnish and Install Connector Pipe Screen Per Plans and Technical Specifications EA 124 $ 910.00 $112,840.00 $ 2,270.00 $281,480.00

3.1 Apparent Low Bidder 1 Apparent Low Bidder 2

3.2 Total $112,840.00 $281,480.00

1. BID TABULATION
PROJECT NAME: Collector Pipe Screen (CPS) Phase 3
PROJECT NO: 13632
Bid Item and Description
Apparent Low Bidder 1
United Storm Water Inc.

Apparent Low Bidder 2
Storm Water Inspection & Maintenance Services

BID TABULATION
S:\ENGINEERING\RFCA's\2024 All\11.6.24\Catch Basin Screens\Connector Pipe Screen (CPS) Phase 3 Bid TabulationBID TABULATION 1 of 1 Packet Page. 838
Packet Page. 839
Packet Page. 840
Packet Page. 841
Packet Page. 842
Packet Page. 843
Packet Page. 844
Packet Page. 845
Packet Page. 846
Packet Page. 847
Packet Page. 848
Packet Page. 849
Packet Page. 850
Packet Page. 851
Packet Page. 852
Packet Page. 853
Packet Page. 854
Packet Page. 855
Packet Page. 856
Packet Page. 857
Packet Page. 858
Packet Page. 859
Packet Page. 860
Packet Page. 861
Packet Page. 862
Packet Page. 863
Packet Page. 864
Packet Page. 865
Packet Page. 866
Packet Page. 867
Packet Page. 868
Packet Page. 869
Packet Page. 870
Packet Page. 871
Packet Page. 872
Packet Page. 873
Packet Page. 874
Packet Page. 875
Packet Page. 876
Packet Page. 877
Packet Page. 878
Packet Page. 879
Packet Page. 880
Packet Page. 881
Packet Page. 882
Packet Page. 883
Packet Page. 884
Packet Page. 885
Packet Page. 886
Packet Page. 887
Packet Page. 888
Packet Page. 889
Packet Page. 890
Packet Page. 891
Packet Page. 892
Packet Page. 893
Attachment 4
Location Map
Packet Page. 894

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: November 20, 2024
To: Honorable Mayor and City Council Members
From: Rochelle Clayton, Acting City Manager;
Lynn Merrill, Director of Public Works, Operations, and Maintenance
Department: Public Works
Subject: Approval of Agreement for the Purchase and
Implementation of SWARCO McCain’s Transparity
Intersection Management System Software (All
Wards)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2024-225:

1. Authorizing the City Manager or designee to approve the award of an Agreement with SWARCO McCain for the purchase of Transparity Intersection Management System (IMS) licensing and data services for $246,663., and 2070LX Controllers for $22,598.25, for a total of $269,261.25; and

2. Authorizing the Director of Finance and Management Services to amend the FY 2024/25 Capital Improvement Project (CIP) budget to utilize funding from specific projects for the traffic management system. Allocate $97,473.68 from the Highland Interconnect Project, $93,723.77 from the Baseline Interconnect Project, and $78,063.80 from the Traffic Management Center project budget, funded with local regional circulation monies, for a total project budget of $269,261.25; and

3. Authorizing the Director of Finance and Management Services to amend the FY 2024/25 Capital Improvement Project (CIP) budget to include the necessary adjustments for funding the traffic management project; and

4. Authorizing the City Manager or designee to execute all documents with SWARCO McCain necessary for the project.

Executive Summary:

SWARCO McCain's Transparity Intersection Management System will enhance realtime traffic monitoring, optimize mobility, and improve road safety by integrating all Packet Page. 895
signalized intersections for seamless communication and proactive congestion management. The total project cost is $269,261.25, covering $224,913 for software licensing, $22,598.25 for 2070LX Controllers, and $20,000 for SQL Licensing.

Funding includes $78,063.80 from the Traffic Management Center budget, with the remaining $97,473.68 from the Highland Interconnect budget and $93,723.77 from the Baseline Interconnect budget, as these projects are congruent with and complement the Traffic Management Center system. There is no general fund impact with this action.

Background
The City of San Bernardino faces significant challenges related to traffic congestion, road safety, and mobility. Traffic delays and accidents have increased in key areas, affecting both daily commuters and emergency services. As the city continues to expand, the need for advanced traffic management tools becomes essential for improving traffic flow, reducing congestion, and enhancing overall safety. With a growing number of vehicles on the road and a network of over 300 signalized intersections, San Bernardino requires a robust Traffic Management System (TMS) to effectively manage traffic signals, optimize mobility, and address road safety concerns.

To meet these growing demands, the City of San Bernardino proposes implementing SWARCO McCain’s Transparity Intersection Management System (IMS) to replace the outdated Quinet McCain software. Transparity IMS is designed to manage both legacy traffic controllers and modern National Transportation Communications for Intelligent Transportation System Protocol (NTCIP)-compliant systems, ensuring the city's traffic control infrastructure remains adaptable and up to date with national standards.

Transparity Licensing software is an automated traffic signal performance measurement tool that gathers and analyzes high-resolution traffic controller data, converting it into actionable insights for improving traffic flow and safety. One key focus area is the dilemma zone, the critical point at an intersection where a driver, seeing a yellow light, is unsure whether to stop or continue through. This splitsecond uncertainty can lead drivers to either speed up to avoid stopping or brake suddenly. If a driver chooses to proceed but the light turns red before they exit the intersection, it greatly increases the risk of a broadside collision. These types of collisions, which occur when a vehicle runs a red light and is struck by another vehicle, are some of the most dangerous traffic accidents.

The Capital Improvement Project (CIP) “Advanced Dilemma Zone Detection System.” targeting high-accident arterial roads received a federal grant specifically aimed at addressing these types of dilemma zones. The project seeks to mitigate the dangers of these intersections by installing advanced traffic signal control systems that adjust signal timing dynamically. One of the key safety features of this project is the ability to extend the red-light phase if a vehicle is detected entering the intersection after the signal has turned red, thus reducing the likelihood of broadside collisions.

Packet Page. 896
SWARCO McCain’s Transparity system stood out not only for its ability to meet the complex requirements of the dilemma zone mitigation but also for offering the most competitive pricing. The system is capable of dynamically adjusting signal timing based on real-time traffic conditions and driver behavior at intersections, ensuring safer decision-making for drivers approaching a yellow light. This solution is a critical component of the CIP’s overall goal of reducing traffic accidents, specifically broadside collisions, by providing drivers with clearer guidance during the yellow signal phase and ensuring intersection safety through intelligent signal timing adjustments.

The system’s compliance with national standards such as NTCIP 1201 and 1202 ensures that SWARCO McCain’s Transparity IMS will evolve alongside the City of San Bernardino’s growing transportation needs. These standards, part of the NTCIP framework, are critical for ensuring long-term functionality and interoperability.

NTCIP 1201 defines global object definitions for Intelligent Transportation Systems (ITS), allowing all components within the traffic management system to communicate seamlessly. NTCIP 1202, on the other hand, focuses specifically on traffic signal controllers, establishing standardized data formats and protocols for their operation, management, and control.

By adhering to these protocols, Transparity IMS will provide the city with a flexible, scalable solution that will reduce congestion, improve safety, and enhance overall mobility, ensuring the city’s traffic management system remains efficient and adaptable in the years to come.

Discussion
The City of San Bernardino proposes the purchase and implementation of SWARCO McCain’s Transparity Intersection Management System (IMS) licensing to enhance traffic signal management across its network of approximately 300 signalized intersections. This advanced system will enable transportation staff to monitor and manage traffic in real-time, audit timing parameters, and conduct remote diagnostics, allowing for faster responses to traffic incidents and more efficient maintenance through wireless connectivity. This system is currently being installed at 49 signalized intersections under the Capital Improvement Project “Advanced Dilemma Zone Detection System.” The proposed purchase will license the remaining 251 signals into the system, allowing for seamless communication across all intersections. This will significantly improve traffic flow, road safety, and overall mobility within the city.

The total cost for the purchase of the Transparity IMS software and data licensing from SWARCO McCain is $246,663. for SQL licensing and physical data systems to support the system’s database needs, including up to 2TB of data storage and backup capacity.

This SQL software is essential for managing the large volumes of traffic data generated by the system, ensuring the integrity and availability of historical traffic logs and timing parameters.

Staff also recommends the purchase of five spare 2070LX Controllers for approximately $22,598.25 to be installed at intersections where existing controllers fail after the warranty period. These controllers work seamlessly with the Transparity IMS, Packet Page. 897
ensuring that all components of the city’s traffic management system function cohesively. The 2070LX Controllers, adhering to Caltrans standards, provide a higherperformance platform while integrating smoothly with existing hardware, eliminating the need for costly replacements. Their compatibility with Transparity is crucial, as it allows for real-time monitoring and control, ensuring all intersections communicate effectively. This unified system approach will enhance traffic flow, improve road safety, and enable efficient responses to incidents, making it vital for the city's traffic operations to have components that work together seamlessly.

The rationale for selecting SWARCO McCain and the Transparity IMS software is built on prior competitive bidding results from the “Implement Advanced Dilemma Zone TC20-008” project. This earlier project was competitively bid, and the lowest bidder selected Transparity for its superior value and functionality over other traffic management software solutions. The decision to use SWARCO McCain’s system was based on extensive market research conducted during the competitive bidding process, which concluded that Transparity offered the best combination of cost efficiency and operational capability to meet the city’s needs for managing traffic at 49 signalized intersections.

The current purchase to license the remaining 251 intersections builds on the city’s prior investment and ensures that all intersections are integrated into the same system.

This single-source purchase is essential for maintaining system compatibility and avoiding the costs associated with replacing existing hardware. Choosing a different vendor for the remaining intersections would require replacing the current physical equipment, which would incur significantly higher costs for hardware replacement and installation.

By using SWARCO McCain for the entire traffic management system, the city avoids the complications of integrating multiple vendors’ systems, which could lead to compatibility issues and higher maintenance costs. A unified system will ensure smoother operations, reduced downtime, and lower long-term costs, ultimately enhancing the efficiency of the city's traffic management network. The expansion of the Transparity system also leverages discounted pricing from SWARCO McCain, further solidifying it as the most cost-effective solution for the City of San Bernardino’s traffic management needs.

It is recommended that the Mayor and City Council of San Bernardino approve the award of an agreement with SWARCO McCain for the purchase and implementation of Transparity IMS software at a total cost of $246,663. and $22,598.25 for the purchase of 2070LX Controllers, bringing the total project cost to $269,261.25

Costs Amounts
SWARCO $246,663.00
2070LXController $22,598.25
Total Cost $269,261.25
Packet Page. 898
The project will be funded with $78,063.80 from the Traffic Management Center project budget. The remaining $191,197.45 will be covered by reallocating $97,473.68 from the Highland Interconnect Project and $93,723.77 from the Baseline Interconnect Project for a total project budget of $269,261.25. Both of these projects are congruent with and complement the Traffic Management Center system, as the new Transparity IMS software takes the place of the previously budgeted systems, allowing the funds to be used for this updated and integrated solution. This ensures efficient use of existing resources while upgrading the city's traffic management infrastructure.

In summary, this purchase is critical for ensuring seamless communication across all signalized intersections in the city. It allows the City of San Bernardino to maximize the benefits of the Transparity software and equipment already in place while avoiding the inefficiencies and costs associated with managing a fragmented traffic system with one another. This unified system approach will enhance traffic flow, improve road safety, and enable efficient responses to incidents, making it vital for the city's overall traffic operations to have components that work together seamlessly. 2021-2025 Strategic Targets and Goals
Authorizing the execution of this amendment aligns with Key Target No. 3 Improved Quality of Life by providing improved traffic flow, road safety, and mobility for all residents and visitors.

Fiscal Impact
There is no General Fund impact associated with this action. This project will be funded with Local Circulation Funded Projects with $78,063.80 from the Traffic Management Center project budget. An additional $191,197.45 will be covered by reallocating $97,473.68 from the Highland Interconnect Project and $93,723.77 from the Baseline Interconnect Project, for a total project allocation of $269,261.25.

Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2024-225:

1. Authorizing the City Manager or designee to approve the award of an Agreement with SWARCO McCain for the purchase of Transparity Intersection Management System (IMS) licensing and data services for $246,663., and 2070LX Controllers for $22,598.25, for a total of $269,261.25; and

2. Authorizing the Director of Finance and Management Services to amend the FY 2024/25 Capital Improvement Project (CIP) budget to utilize Projects Amounts
Traffic Management Center $78,063.80
Highland Interconnect $97,473.68
BaselineInterconnect $93,723.77
Total Budget $269,261.25
Packet Page. 899
funding from specific projects for the traffic management system. Allocate $97,473.68 from the Highland Interconnect Project, $93,723.77 from the Baseline Interconnect Project, and $78,063.80 from the Traffic Management Center project budget, funded with local regional circulation monies, for a total project budget of $269,261.25; and

3. Authorizing the Director of Finance and Management Services to amend the FY 2024/25 Capital Improvement Project (CIP) budget to include the necessary adjustments for funding the traffic management project; and

4. Authorizing the City Manager or designee to execute all documents with SWARCO McCain necessary for the project.

Attachments
Attachment 1 Resolution 2024-225
Attachment 2 SWARCO Quote & Scope of Work
Attachment 3 SWARCO Quote for 2070LX Controllers
Attachment 4 Sole Source Justification Form
Attachment 5 Project Location Map
Attachment 6 Belco Elecnor Guarantee to Deliver Transparity Licenses/Software for Advanced Dilemma Zone Project
Ward:

All Wards
Synopsis of Previous Council Actions:

June 1, 2022 Resolution No. 2022-102 of the Mayor and City Council of the City of San Bernardino Approving and Adopting the City’s annual operating budgets and Capital Improvement Plan (CIP) for FY2024 and establishing the City’s appropriation limit.

Packet Page. 900
Resolution No. 2024-225
Resolution 2024-225
November 20, 2024

Page 1 of 4 ends

RESOLUTION NO. 2024-225

RESOLUTION OF THE MAYOR AND CITY COUNCIL OF

THE CITY OF SAN BERNARDINO, CALIFORNIA,

AUTHORIZING THE CITY MANAGER OR DESIGNEE TO

APPROVE THE AWARD OF AN AGREEMENT WITH

SWARCO MCCAIN FOR THE PURCHASE OF

TRANSPARITY INTERSECTION MANAGEMENT

SYSTEM (IMS) LICENSING, DATA SERVICES FOR
$246,663., AND 2070LX CONTROLLERS FOR $22,598.25,

PLUS SALES TAX, BRINGING THE TOTAL PROJECT
COST TO $269,261.25; AUTHORIZING THE DIRECTOR OF

FINANCE AND MANAGEMENT SERVICES TO AMEND
THE FY 2024/25 CAPITAL IMPROVEMENT PROJECT
(CIP) BUDGET TO UTILIZE $97,473.68 FROM THE
HIGHLAND INTERCONNECT PROJECT, $93,723.77 FROM

THE BASELINE INTERCONNECT PROJECT, AND
$78,063.80 FROM THE TRAFFIC MANAGEMENT CENTER

PROJECT BUDGET, FUNDED WITH LOCAL REGIONAL

CIRCULATION MONIES, TO COVER THE TOTAL
PROJECT COST OF $269,261.25; AND AUTHORIZING THE

CITY MANAGER OR DESIGNEE TO EXECUTE ALL

DOCUMENTS WITH SWARCO MCCAIN NECESSARY
FOR THE PROJECT.

WHEREAS, the City of San Bernardino has over 300 signalized intersections and faces significant challenges related to traffic congestion, road safety, and mobility; and WHEREAS, the City of San Bernardino is committed to improving traffic flow and safety through the purchase and implementation of modern traffic management software; and WHEREAS, the City of San Bernardino has identified SWARCO McCain’s Transparity Intersection Management System (IMS) as a vital tool for real-time traffic monitoring and management, providing long-term benefits for mobility and road safety;

BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS:

SECTION 1. The above recitals are true and correct and are incorporated herein by this reference.

Packet Page. 901
Resolution No. 2024-225
Resolution 2024-225
November 20, 2024

Page 2 of 4 ends

SECTION 2. The City Manager or designee is hereby authorized to approve an Agreement with SWARCO McCain for the purchase of Transparity Intersection Management System (IMS) licensing, data services, and 2070LX Controllers, plus sales tax, for a total of $269,261.25; and SECTION 3. The Director of Finance and Management Services is hereby authorized to amend the FY 2024/25 Capital Improvement Project (CIP) budget to utilize funding from specific projects for the traffic management system. Allocating $97,473.68 from the Highland Interconnect Project, $93,723.77 from the Baseline Interconnect Project, and $78,063.80 from the Traffic Management Center project budget, funded with local regional circulation monies, for a total project budget of $269,261.25; and
SECTION 4. The Director of Finance and Management Services is hereby authorized to amend the FY 2024/25 Capital Improvement Project (CIP) list and budget to include the necessary adjustments for funding the traffic management project; and SECTION 5. The City Manager or designee is authorized to execute all necessary documents with SWARCO McCain to proceed with the purchase and implementation of the Transparity IMS software.

SECTION 6. The City Council finds this Resolution is not subject to the California Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty, as in this case, that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

SECTION 7. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications, and to this end the provisions of this Resolution are declared to be severable.

SECTION 8. Effective Date. This Resolution shall become effective immediately.

APPROVED and ADOPTED by the City Council and signed by the Mayor and attested by the City Clerk this 20th day of November 2024.

Helen Tran, Mayor
City of San Bernardino
Attest:

Packet Page. 902
Resolution No. 2024-225
Resolution 2024-225
November 20, 2024

Page 3 of 4 ends

Genoveva Rocha, CMC, City Clerk
Approved as to form:

Sonia Carvalho, City Attorney
Packet Page. 903
Resolution No. 2024-225
Resolution 2024-225
November 20, 2024

Page 4 of 4 ends

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss

CITY OF SAN BERNARDINO )
I, Genoveva Rocha, CMC, City Clerk, hereby certify that the attached is a true copy of Resolution No. 2024-225, adopted at a regular meeting held on the 20th day of November 2024 by the following vote:

Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
REYNOSO _____ _____ _______ _______
CALVIN _____ _____ _______ _______
ALEXANDER _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of ____________ 2024.

Genoveva Rocha, CMC, City Clerk
Packet Page. 904
SWARCO McCain, Inc.
2365 Oak Ridge Way
Vista, CA 92081
Attention: Ryan Castillo
Company/Agency: City of San Bernardino
Address: 201 N. “E” Street – 2nd floor
San Bernardino, CA 92418
City of San Bernardino Transparity for 300 Intersections BU020524-300-2 revA
SWARCO McCain is pleased to provide this quotation on the following item(s):

Item # Qty Unit Description Unit Price Sale Price
1 251 Each On-Prem / Enterprise Transparity Traffic Management System (TMS) Licensing - qty: 251 - this increases agency's total Transparity licenses to qty: 300 $ 500.00 $ 125,500.00
2 1 Lump Transparity Hardware (Server) $ 20,000.00 $ 20,000.00 3 1 Lump Tax on Server $ 1,750.00 $ 1,750.00
4 1 Lump
Project Management/ Administration/Professional Services/ Labor:
- Database creation and system map configuration
- Assistance with communications cutover
$ 11,583.00 $ 11,583.00
5 300 Each Custom Aerial Intersection Graphics (Standard Unit Price: $330, special one-time discount: $276.10) (see scope note 3) $ 276.10 $ 82,830.00 6 1 Day Remote Training (see scope note 4) $ 2,500.00 $ 2,500.00 7 1 Day Remote Systems Acceptance and Validation Testing (see scope note 4) $ 2,500.00 $ 2,500.00 Total $ 246,663.00
To be paid according to the following Billing Schedule/Milestones Billable Amount Transparity Traffic Management System (TMS) Licensing
Deliverable: Billed at NTP
$ 125,500.00
Receipt of Transparity Server
Deliverable: DELL R660 Server
$ 21,750.00
Completion of Transparity TMS installation, database creation, and system map configuration Deliverables: Transparity TMS system map with configured locations (agency specified) and completed install sign-off sheet
$ 11,583.00
Implementation of Custom Aerial Intersection Graphics
Deliverables: custom aerial displays
$ 82,830.00
Completion of Remote Transparity Training
Deliverables: Final training agenda & completion of remote Transparity TMS training session $ 2,500.00
After completion of System Acceptance Test, this signifies project completion and start of the maintenance period Deliverables: Completed acceptance test document and project closure document $ 2,500.00
Quote Notes:

The information contained in this document is intended for the person or entity to which it is addressed and may contain confidential and/or legally privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and delete the material from any computer.

Central System Software (see scope notes 1 & 2)
Training and Testing

2. Customer is responsible for ensuring that communications and detection is operational and for providing the network scheme, as applicable. Does not include field installation or timing conversion support.

Professional Services / Labor Items (see scope notes 1 & 2)

1. All prices are in US Dollars. All payments to be made in US Dollars. Project will be billed per the schedule/milestones

2. Purchase order (PO) must match line items in quote.

3. Prices are firm for 30 days. Tax is based on the current 8.75% rate. Freight is not included.

4. All software available through remote download only.

5. Sale is subject to SWARCO McCain's standard terms and conditions.

Project Description:

November 5, 2024

1. All labor is remote unless indicated otherwise. VPN or internet access is required to provide remote support.

4. Remote training and testing to be provided by SWARCO McCain ITS Project Engineer via MS Teams. SWARCO McCain requires 4-8 weeks advance notice for scheduling.

Scope Notes:

Quote Number:

Bob Ung

3. Custom aerial backgrounds containing the following information:
- Vehicle phase call / indications
- Pedestrian phase call / indications
- Overlap / FYA indications (as applicable)
- Signal status (overlain on aerial background or on right sidebar depending on local software version) - Street name labels
QUOTE
Packet Page. 905
____________________________________________

QUOTATION
Estimator: Melissa Lanini
Quote #: MRL100124A (760)734-5086
Agency: San Bernardino City o [email protected] Job Name:2070LX and accessories
Bid Date: 10/1/24
Bid Item Qnty Description Price Extension
5 2070LX CONTROLLER, TEES 2020; 1C
T20, 2E+ T20, 3B T20, 4A - EB4 W/ OMNI
$4,156.00 $20,780.00

TIMING NOT INCLUDED

TURN ON SUPPORT NOT INCLUDED

TRANSPARITY NOT INCLUDED
Tax 8.75% *subject to change $1,818.25
Reference Total $22,598.25
Prices firm for 90 days. Freight included. Add sales tax.

Sale is subject to Swarco's standard terms and conditions.

The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or legally privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. ,
If you received this in error, please contact the sender and delete the material from any computer.

Packet Page. 906
City of San Bernardino
Finance Department, Purchasing Division

JUSTIFICATION OF SINGLE/SOLE SOURCE REQUEST
ITEM Description: _Traffic Management Center Licensing_____________ DATE: _10/03/2024__ Select Source:
__ __Sole Source: Item is manufactured and/or only distributed by one vendor.

XX_ Single Source: Item is available from several vendors, but item is the only one that will work.

Please answer all questions in detail, in order to prevent delays in the evaluation. Please do not provide one sentence answers. If any additional pages are needed to answer all questions, please attach all pages to this document.

1. Why is the acquisition restricted to this good/service/supplier? (Explain why the acquisition cannot be competitively bid). Please enter the answer below:

The project "Implement Advanced Dilemma Zone TC20-008" was put out for competitive bidding on August 1, 2019, and the lowest bidder selected Transparity software for 49 signalized intersections.

However, this new Transparity software is currently only compatible with the 49 intersections in the TC20- 008 project and does not communicate with the existing 251 intersections in the city. To ensure that all 300 intersections (the 49 from the project and the 251 existing ones) can communicate with each other through the Transparity software, the City needs to purchase additional licensing for the 251 existing intersections. This purchase will allow the entire traffic signal network to be managed under the same system

2. Describe the uniqueness of the purchase (why was the good/service/supplier chosen?) Please enter the answer below:
signal network under a single, unified system. The "Implement Advanced Dilemma Zone TC20-008" project went through a competitive bidding process, during which the Transparity software was selected for 49 signalized intersections due to its advanced capabilities. However, the existing 251 signalized intersections are not yet compatible with this new software.

In order to ensure that all 300 intersections (49 from the project and 251 existing ones) can communicate and be managed effectively through the Traffic Management Center (TMC), it is essential to license the remaining 251 intersections. Transparity software was chosen for its advanced real-time monitoring and traffic management features, which will enhance traffic flow and safety across the city once all intersections are integrated. This purchase is critical because it allows the City to standardize its traffic management system, ensuring seamless communication between all signalized intersections.

3. What are the consequences of not purchasing the goods/service or contracting with the proposed supplier? Procurement services provided to the departments/vendors would be delayed.

The consequences of not purchasing the necessary licensing for the existing 251 signalized intersections would be significant. Without this purchase, the City will not be able to integrate the existing intersections into the newly acquired Transparity software, which was selected for the 49 intersections under the "Implement Advanced Dilemma Zone TC20-008" project. This would result in a fragmented traffic management system where only 49 intersections are managed by the Transparity software, leaving the remaining 251 intersections unable to communicate with the system.

Packet Page. 907
network effectively,
leading to inefficiencies in traffic flow, delayed response times to incidents, and reduced overall road safety. Moreover, without this licensing, the investment made in the Transparity software for the TC20- 008 project would be underu
intersections. In short, failure to purchase the necessary licensing would prevent the City from fully benefiting from the advanced capabilities of the Transparity software, leading to ongoing operational challenges and potentially higher long-term costs.

4. What market research was conducted to substantiate the single source, including evaluation of other items considered? a. (Please provide a narrative of your efforts to identify other similar or appropriate goods/services, including a summary of how the department concluded that such alternatives are either inappropriate or unavailable. The names, addresses and phone numbers of suppliers contacted and the reasons for not considering them must be included or an explanation of why the survey or effort to identify other goods/services was not performed.)
During the competitive bidding process for the "Implement Advanced Dilemma Zone TC20-008" project, multiple traffic management software solutions were submitted for consideration. The lowest bidder conducted extensive market research and determined that Transparity software provided the best value in terms of price and functionality compared to other alternatives. Transparity was selected not only for its option for managing the 49 signalized intersections involved in the project.

In addition to the software, the City has already invested in and installed physical equipment that is compatible with Transparity. If the City does not purchase the necessary licensing to integrate the existing 251 signalized intersections into the Transparity system, the current physical equipment would be rendered incompatible. This would necessitate replacing the existing equipment with new hardware, leading to significantly higher costs.

Alternative software solutions were evaluated during the bidding process, but they were either more expensive
remaining intersections would create operational inefficiencies, increase costs due to the need for new equipment, and prevent seamless communication between t purchase of the additional licensing for the 251 intersections is essential to fully integrate the entire traffic signal network under one system, making Transparity the most cost-effective and practical solution.

5. How was the price offered determined to be fair and reasonable? Explain what the basis was for comparison and include cost analyses as applicable.
to the city or to another agency/company or any other method of comparison that will substantiate fair and reasonable pricing in the absence of competition)
The price offered by SWARCO McCain for the additional licensing of the 251 signalized intersections was determined to be fair and reasonable based on se
Transparity software for the 49 intersections under the TC20-008 project, SWARCO McCain extended a discounted price for licensing the remaining 251 intersections. This discount was offered as part of a In addition to the discounted pricing, the cost was compared against the original pricing for the 49 intersections, showing a favorable reduction in cost per intersection for the additional licenses. management software solutions during the competitive bidding process, which confirmed that Transparity was competitively priced. The other manufacturers were not capable of matching the physical hardware equipment that is already installed which would force the purchase hardware for all intersections. in the TC20-008 project after
an extensive review of other vendors and considering the added benefit of the discount for expanding the Packet Page. 908
licensing to 251 additional intersections, the pricing is considered fair and reasonable. This ensures that the City will receive a cost-effective solution while maintaining compatibility with the existing infrastructure.

6. Describe any cost savings realized, or costs avoided by acquiring the goods/services from this supplier.

By acquiring the licensing for the additional 251 signalized intersections from SWARCO McCain, the City of San Bernardino will realize significant cost savings and avoid potential additional costs. First, this purchase ensures compatibility with the existing Transparity software and physical equipment that has already been installed under the TC20-008 project. If the City were to acquire a different software solution, it would necessitate replacing the existing physical equipment, which would incur substantial costs for hardware replacement and installation.

Additionally, using a single vendor for the entire traffic management system avoids the costs associated with integrating multiple systems from different vendors, which can lead to compatibility issues, higher maintenance costs, and longer response times for troubleshooting. By maintaining one unified system with SWARCO McCain, the City avoids these complications, ensuring smoother operations, reduced downtime, and lower long-term maintenance costs.

1. ____________________________ _________________
Department Head Date

2. ____________________________ _________________ Approved Not Approved (Up to $50,000)
Director of Finance & Management Services Date

3. ____________________________ _________________ Approved Not Approved (Up to $100,000)
City Manager Date
Justification: __ In summary, acquiring the additional licenses from SWARCO McCain avoids the significant expense of new hardware and system integration, while also securing cost savings through efficiently under one cohesive system.

4. Over $100,000 must be submitted for City Council Approval.

Packet Page. 909
Traffic Signal Map - City of San Bernardino
Packet Page. 910
14320 Albers Way
Chino, CA 91710
We think about a better world (909) 993-5470 Office
www.elecnorbelco.com (909) 993-5476 Fax
CA License 738518
October 15, 2024 Serial No. 14-0737-027
Agreement to Guarantee Delivery of Transparity Licenses/Software Reference: Implementation of Advanced Dilemma Zone Detection at 49 Intersections on Three Corridors: Baseline St., Mt. Vernon Ave. and Highland Ave.

City of San Bernardino Project No. TC20-008
Federal Project No. HSIPL-5033(057)
Drawing No. 13439
Vendor: Swarco
PO: 302-0513 (TEK Services, LLC.)
Product: Forty-Nine (49) Transparity Licenses/Software
I,5REHUW8QJ, an authorized representative of Swarco, agree to guarantee the delivery of fortynine (49) Transparity Licenses/Software/Install and Integrate with the existing system to the City of San Bernardino as purchased via TEK Services, LLC’s Purchase Order No. 302-0513. _____________________
Signature
5REHUW8QJ
'LUHFWRU,766ROXWLRQVDQG6HUYLFHV
Printed Name/Title
_________
Date
_____________________
Signature
Packet Page. 911

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: November 20, 2024
To: Honorable Mayor and City Council Members
From: Rochelle Clayton, Acting City Manager;
Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Award of Design Services Agreement for the Police Locker Room Renovation (Ward 1)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Authorize the City Manager or designee to approve the award of a Design Services Agreement with TR Design Group, Inc. in the not to exceed amount of $549,967.57 for Police Locker Room Renovation (Project); and

2. Authorize the City Manager or designee to execute all documents with TR Design Group Inc.

Executive Summary
The Agreement would allow the City to issue TR Design Group, Inc. a Notice to Proceed, initiating the process to design the improvements. The agreement will include TR Design Group, Inc. not to exceed design fee of $549,967.57 for design work. Awarding the Agreement for the design of the Police Locker Room Renovation Project would allow the project to move forward promptly, ensuring that the Police department benefits from upgraded facilities that support their critical work and wellbeing.

Background
This project focuses on updating the locker rooms located on the second floor of the Central Police Building at 710 N D St, San Bernardino, CA 92401. These locker rooms, essential to the daily operations of our police department, have not been significantly upgraded in several years. The renovation aims to modernize these facilities, improve their functionality, and enhance the overall comfort and security for the personnel who Packet Page. 912
use them. The project is a critical step in ensuring that our police force operates in a well-maintained and supportive environment, reflecting the City's commitment to providing high-quality amenities for its first responders.

On June 21, 2023, the Mayor and City Council adopted Resolution No. 2023-080, which approved the Fiscal Year 2023 and Fiscal Year 2024 Operating Budget and Capital Improvement Plan. This resolution provided the financial framework and authorization necessary for various projects and initiatives, including infrastructure upgrades and facility improvements. The adoption of this resolution confirmed the allocation of funds for critical projects, ensuring that necessary renovations, such as those for the police locker rooms, are supported within the City's broader budgetary and strategic planning efforts.

Discussion
This project is focused on modernizing and upgrading the locker room facilities for our police personnel, with the goal of making these spaces more functional, secure, and comfortable. The proposed design services agreement will cover every stage of the design process, including site assessments, conceptual designs, detailed architectural plans, and oversight during construction.

The project was advertised through PlanetBids on June 17th through July 18th, 2024. A single submittal was received from TR Design Group, Inc. The submittal was evaluated based on qualifications and understanding of project scope. TR Design Group, Inc. was determined to be qualified for the design work.

The agreement with TR Design Group, Inc. is designed to ensure efficient completion of the design work while allowing for necessary adjustments and administrative oversight. The not to exceed design fee is $549,967.57, based on industry standards for projects of this scale, fitting within a total budget of $549,967.57.

The scope of work is divided into phases. Phase 01 involves planning and code review, costing $47,560.00. During this phase, TR Design Group will review existing drawings, verify the current utilities, and complete photo documentation of the existing site.

Phase 02 will focus on creating schematic drawings, with an estimated cost of $89,175.00. TR Design Group will work to address any potential mechanical, electrical, or plumbing issues based on a discussion of design concepts.

Future phases will be determined based on the results of Phases 01 and 02.

Environmental Impact
The Project is categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to State CEQA Guidelines Section 15302, Replacement or Reconstruction (“Class 3”). The Class 2 exemptions allow for the replacement or reconstruction of existing structures or facilities where the new structure will be located on the same site as the structure replaced and will have substantially the Packet Page. 913
same purpose and capacity as the structure replaced. Here, the Project involves reconstructing the police locker room with a new facility located on the same site that will serve as the new police locker room.

The City has also considered whether the proposed Project is subject to any exception to the Class 2 exemption, as set forth in State CEQA Guidelines section 15300.2. No exception applies for the following reasons:
a) The location exception only applies to Class 3, 4, 5, 6, and 11 exemptions, none of which are being utilized here.
b) The proposed Project would not result in any significant cumulative impacts on the environment. The cumulative impacts exception does not apply because the Project has no incrementally significant impacts on the environment. c) A categorical exemption may be subject to an exception where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances. The proposed Project does not involve any unusual circumstances and has no potential to result in a significant impact on the environment.
d) Under the “scenic highways” exception, a categorical exemption may be subject to an exception where the project may result in damage to scenic resources within a highway officially designated as a state scenic highway. The exception does not apply here as the Project would not damage any scenic resources within a state scenic highway.

e) The Project is not located on a site which is included on any list compiled pursuant to Section 65962.5 of the Government Code.
f) The Project site does not contain a historical resource. 2021-2025 Strategic Targets and Goals
This Project is consistent with Key Strategic Target and Goal No. 2a: Focused, Aligned Leadership and Unified Community – Build a culture that attracts, retains, and motivates the highest qualify talent and Goal No. 3c: Improved Quality of Life. - Evaluate and enhance the quality of public safety services. This Design Services Agreement will enhance the working environment for our law enforcement professionals by ensuring that they have access to modern, functional, and wellmaintained facilities.

Fiscal Impact
There is no General Fund impact associated with this action.

Packet Page. 914
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Authorize the City Manager or designee to approve the award of a Design Services Agreement with TR Design Group, Inc. in the not to exceed amount of $549,967.57 for Police Locker Room Renovation (Project); and

2. Authorize the City Manager or designee to execute all documents with TR Design Group Inc.

Attachments
Attachment 1 Design Services Agreement with TR Design Group, Inc.

Attachment 2 Proposal – TR Design Group, Inc.

Attachment 3 Location Map
Ward:

First Ward
Synopsis of Previous Council Actions:

June 21, 2023 Mayor and City Council adopted Resolution No. 2023-080 approving Fiscal Year 2023 & Fiscal Year 2024 Operating Budget and Capital Improvement Plan
Packet Page. 915
1 CITY OF SAN BERNARDINO

DESIGN SERVICES AGREEMENT

1. PARTIES AND DATE.

This Agreement is made and entered into as November 20, 2024 by and between the City of San Bernardino, a charter city and municipal corporation organized and operating under the laws of the State of California, with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401 (“City”), and TR Design Group, a Corporation with its principal place of business at 2900 Adams Street, Studio A-400, Riverside, California, 92504 (hereinafter referred to as “Designer”). City and Designer are sometimes individually referred to herein as “Party” and collectively as “Parties.”

2. RECITALS.

2.1 City. City is a municipal corporation organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.

2.2 Designer. Designer desires to perform and assume responsibility for the provision of certain professional design services required by the City on the terms and conditions set forth in this Agreement. Designer warrants that it is fully licensed, qualified, and willing to perform the services required by this Agreement; provided, however, that if Designer is a corporation or other organization, the Project Designer designated pursuant to Section 3.2, and not the Designer itself, shall be fully licensed to practice as an architect and/or engineer in the State of California.

2.3 Project. City desires to engage Designer to render such services for the Police Locker Room Renovation ("Project") as set forth in this Agreement.

3. TERMS

3.1 Employment of Designer.

3.1.1 Scope of Services. Designer promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional design and related services necessary for the full and adequate completion of the Project consistent with the provisions of this Agreement (hereinafter referred to as “Services”). The Services are more particularly described throughout this Agreement, including Exhibit “A” attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, any exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. All Services performed by Designer shall be subject to the sole and discretionary approval of the City, which approval shall not be unreasonably withheld. her designee, shall have the unilateral option, at their sole discretion, to renew this Agreement for no more than three additional one-year terms. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.

3.1.2 Term. The term of this Agreement shall be from November 20, 2024 to November 20, 2025, unless earlier terminated as provided herein. The City Manager, or his or Packet Page. 916
2 3.2 Project Designer; Key Personnel.

3.2.1 Project Designer. Designer shall name a specific individual to act as Project Designer, subject to the approval of City. Designer hereby designates Thomas Riggle (License No. C24877 to act as the Project Designer for the Project. The Project Designer shall:
(1) maintain oversight of the Services; (2) have full authority to represent and act on behalf of the Designer for all purposes under this Agreement; (3) supervise and direct the Services using his or her best skill and attention; (4) be responsible for the means, methods, techniques, sequences and procedures used for the Services; (5) adequately coordinate all portions of the Services; and (6) act as principal contact with City and all contractors, consultants, engineers and inspectors on the Project. Any change in the Project Designer shall be subject to the City’s prior written approval, which approval shall not be unreasonably withheld. The new Project Designer shall be of at least equal competence as the prior Project Designer. In the event that City and Designer cannot agree as to the substitution of a new Project Designer, City shall be entitled to terminate this Agreement for cause.

3.2.2 Key Personnel. In addition to the Project Designer, Designer has represented to the City that certain additional key personnel, engineers and consultants will perform the Services under this Agreement. Should one or more of such personnel, engineers or consultants become unavailable, Designer may substitute others of at least equal competence upon written approval of the City. In the event that City and Designer cannot agree as to the substitution of key personnel, engineers or consultants, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel, engineers or consultants who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Designer at the request of the City. The key additional personnel, engineers and consultants for performance of this Agreement are as follows:

Xavier Adrian – Senior Project Manager
James Horecka – Senior Architect, AIA, CASp, QA/QC
Richard Jaeger – Project Architect, AIA, ICC – B3

3.3 Hiring of Consultants and Personnel.

3.3.1 Right to Hire or Employ. Designer shall have the option, unless City objects in writing after notice, to employ at its expense architects, engineers, experts or other consultants qualified and licensed to render services in connection with the planning and/or administration of the Project, and to delegate to them such duties as Designer may delegate without relieving Designer from administrative or other responsibility under this Agreement.

Designer shall be responsible for the coordination and cooperation of Designer’s architects, engineers, experts or other consultants. All consultants, including changes in consultants, shall be subject to approval by City in its sole and reasonable discretion. Designer shall notify City of the identity of all consultants at least fourteen (14) days prior to their commencement of work to allow City to review their qualifications and approve to their participation on the Project in its sole and reasonable discretion.

3.3.2 Qualification and License. All architects, engineers, experts and other consultants retained by Designer in performance of this Agreement shall be qualified to perform Packet Page. 917
3 the Services assigned to them, and shall be licensed to practice in their respective professions, where required by law.

3.3.3 Standards and Insurance. All architects, engineers, experts and other consultants hired by Designer shall be required to meet all of the same standards and insurance requirements set forth in this Agreement, unless other standards or requirements are approved by the City in writing. Unless changes are approved in writing by the City, Designer’s agreements with its consultants shall contain a provision making them subject to all provisions stipulated in this Agreement.

3.3.4 Assignments or Staff Changes. Designer shall promptly obtain written City approval of any assignment, reassignment or replacement of such architects, engineers, experts and consultants, or of other staff changes of key personnel working on the Project. As provided in the Agreement, any changes in Designer’s consultants and key personnel shall be subject to approval by City.

3.3.5 Draftsman and Clerical Support. Draftsmen and clerical personnel shall be retained by Designer at Designer’s sole expense.

3.4 Standard of Care.

3.4.1 Standard of Care. Designer shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals qualified to perform the Services in the same discipline in the State of California, and shall be responsible to City for damages sustained by the City and delays to the Project as specified in the indemnification provision of this Agreement. Without limiting the foregoing, Designer shall be fully responsible to the City for any increased costs incurred by the City as a result of any such delays in the design or construction of the Project. Designer represents and maintains that it is skilled in the professional calling necessary to perform the Services. Designer warrants and represents that all of its employees, architects, engineers, experts and other consultants shall have sufficient skill and experience to perform the Services assigned to them. Finally, Designer represents that it, its employees, architects, engineers, experts and other consultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services assigned to or rendered by them and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Designer shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Designer’s failure to comply with the standard of care provided for herein.

3.4.2 Performance of Employees. Any employee or consultant who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee or consultant who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Designer and shall not be re-employed to perform any of the Services or to work on the Project.

3.5 Laws and Regulations.

3.5.1 Knowledge and Compliance. Designer shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in any Packet Page. 918
4 manner affecting the performance of the Services or the Project, and shall give all notices required of the Designer by law. Designer shall be liable, pursuant to the standard of care and indemnification provisions of this Agreement, for all violations of such laws and regulations in connection with its Services. If the Designer performs any work knowing it to be contrary to such laws, rules and regulations, Designer shall be solely responsible for all costs arising therefrom. Designer shall defend, indemnify and hold City, its officials, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.5.2 Drawings and Specifications. Designer shall cause all drawings and specifications to conform to any applicable requirements of federal, state and local laws, rules and regulations, including the Uniform Building Code, in effect as of the time the drawings and specifications are prepared or revised during the latest phase of the Services described in Exhibit “A” attached hereto. Any significant revisions made necessary by changes in such laws, rules and regulations after this time may be compensated as Additional Services which were not known or reasonably should not have been known by Designer. Designer shall cause the necessary copies of such drawings and specifications to be filed with any governmental bodies with approval jurisdiction over the Project, in accordance with the Services described in Exhibit “A” attached hereto. For the preparation of all such drawings and specifications, the Designer shall use Computer Aided Design Drafting (“CADD”) (e.g., AutoCAD) or other technology acceptable to the Designer and City.

3.5.3 Americans with Disabilities Act. Designer will use its best professional efforts to interpret all applicable federal, state and local laws, rules and regulations with respect to access, including those of the Americans with Disabilities Act (“ADA”). Designer shall inform City of the existence of inconsistencies of which it is aware or reasonably should be aware between federal and state accessibility laws, rules and regulations, as well as any other issues which are subject to conflicting interpretations of the law, and shall provide the City with its interpretation of such inconsistencies and conflicting interpretations. Unless Designer brings such inconsistencies and conflicting interpretations to the attention of the City and requests City’s direction on how to proceed, the Designer’s interpretation of such inconsistencies and conflicting interpretations shall be the sole responsibility and liability of Designer, and the Designer shall correct all plans, specifications and other documents prepared for the Project at no additional cost if its interpretations are shown to be incorrect. In the event that the Designer request’s City’s direction on how to proceed with respect to any inconsistent and/or conflicting interpretation, the Designer shall be responsible to the City only pursuant to the indemnification provisions of this Agreement.

3.5.4 Permits, Approvals and Authorizations. Designer shall provide City with a list of all permits, approvals or other authorizations required for the Project from all federal, state or local governmental bodies with approval jurisdiction over the Project. Designer shall then assist the City in obtaining all such permits, approvals and other authorizations. The costs of such permits, approvals and other authorizations shall be paid by the City.

3.5.5 Water Quality Management and Compliance.
(a) Compliance with Water Quality Laws, Ordinances and
Regulations. Designer shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Services including, without limitation, all Packet Page. 919
5 applicable provisions of the City’s ordinances regulating water quality and storm water; the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); and any and all regulations, policies, or permits issued pursuant to any such authority. Designer shall additionally comply with the lawful requirements of the City, and any other municipality, drainage district, or other local agency with jurisdiction over the location where the Services are to be conducted, regulating water quality and storm water discharges.
(b) Standard of Care. Designer warrants that all employees and subcontractors shall have sufficient skill and experience to perform the work assigned to them without impacting water quality in violation of the laws, regulations and policies described in Sections 3.5.5(a) of this Agreement. Designer further warrants that it, its employees and subcontractors will receive adequate training, as determined by the City, regarding these requirements as they may relate to the Services.
(c) Liability for Non-compliance.
(i) Indemnity: Failure to comply with laws, regulations, and ordinances listed in Sections 3.5.5(a) of this Agreement is a violation of federal and state law.

Notwithstanding any other indemnity contained in this Agreement, Designer agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the laws, regulations, and ordinances listed above, arising out of or in connection with the Services, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.
(ii) Defense: City reserves the right to defend any
enforcement action or civil action brought against the City for Designer’s failure to comply with any applicable water quality law, regulation, or policy. Designer hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and the relevant enforcement entity.
(iii) Damages: City may seek damages from Designer for
delay in completing the Services caused by Designer’s failure to comply with the laws, regulations and policies described in Section 3.5.5(a) of this Agreement, or any other relevant water quality law, regulation, or policy.

3.5.6 Air Quality.
(a) Compliance with Air Quality Laws, Ordinances, and Regulations.

Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Contractor shall specifically be aware of the CARB limits and requirements’ application to “portable equipment”, which definition is considered by CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARB or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.

Packet Page. 920
6 3.6 Independent Contractor.

3.6.1 Control and Payment of Subordinates. City retains Designer on an independent contractor basis and Designer is not an employee of City. Designer is not an employee for state tax, federal tax or any other purpose, and is not entitled to the rights or benefits afforded to City’s employees. Any additional personnel performing the Services under this Agreement on behalf of Designer shall also not be employees of City, and shall at all times be under Designer’s exclusive direction and control. Designer shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Designer shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.

3.7 Schedule of Services.

3.7.1 Designer Services. Designer shall fully and adequately complete the Services described in this Agreement and in Exhibit “A” attached hereto and incorporated herein by reference.

3.7.2 Timely Performance Standard. Designer shall perform all Services hereunder as expeditiously as is consistent with professional skill and care, as well as the orderly progress of the Project work so as not to be the cause, in whole or in part, of delays in the completion of the Project or in the achievement of any Project milestones, as provided herein. Specifically, Designer shall perform its Services so as to allow for the full and adequate completion of the Project within the time required by the City and within any completion schedules adopted for the Project. Designer agrees to coordinate with City’s staff, contractors and consultants in the performance of the Services, and shall be available to City’s staff, contractors and consultants at all reasonable times.

3.7.3 Performance Schedule. Designer shall prepare an estimated time schedule for the performance of Designer’s Services, to be adjusted as the Project proceeds.

Such schedule shall be subject to the City’s review and approval, which approval shall not be unreasonably withheld, and shall include allowances for periods of time required for City’s review and approval of submissions, and for approvals of authorities having jurisdiction over Project approval and funding. If City and Designer cannot mutually agree on a performance schedule, City shall have the authority to immediately terminate this Agreement. The schedule shall not be exceeded by Designer without the prior written approval of City. If the Designer’s Services are not completed within the time provided by the agreed upon performance schedule, or any milestones established therein, it is understood, acknowledged and agreed that the City will suffer damage for which the Designer will be responsible pursuant to the indemnification provision of this Agreement.

3.7.4 Excusable Delays. Any delays in Designer’s work caused by the following shall be added to the time for completion of any obligations of Designer: (1) the actions of City or its employees; (2) the actions of those in direct contractual relationship with City; (3) the actions of any governmental agency having jurisdiction over the Project; (4) the actions of any parties not within the reasonable control of the Designer; and (5) Force Majeure Event .

Neither the City nor the Designer shall be liable for damages, liquidated or otherwise, to the other on account of such delays. Such a non-compensable adjustment shall be Designer’s sole and exclusive remedy for such delays and the Designer will not receive an adjustment to the Packet Page. 921
7 contract price or any other compensation. A Force Majeure Event shall mean an event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the project site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the work); (4) pandemics, epidemics or quarantine restrictions; and (5) strikes and other organized labor action occurring at the project site and the effects thereof on the work, only to the extent such strikes and other organized labor action are beyond the control of Designer and its subcontractors, of every tier, and to the extent the effects thereof cannot be avoided by use of replacement workers. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.

3.7.5 Request for Excusable Delay Credit. The Designer shall, within fifteen (15) calendar days of the beginning of any excusable delay, notify the City in writing of the causes of delay (unless City grants in writing a further period of time to file such notice prior to the date of final payment under the Agreement). City will then ascertain the facts and the extent of the delay, and grant an extension of time for completing the Services when, in its sole judgment, the findings of fact justify such an extension. The City’s findings of fact thereon shall be final and conclusive on the parties. Extensions of time shall apply only to that portion of the Services affected by the delay and shall not apply to other portions of the Services not so affected. The sole remedy of Designer for extensions of time shall be an extension of the performance time at no cost to the City. If Additional Services are required as a result of an excusable delay, the parties shall mutually agree thereto pursuant to the Additional Services provision of this Agreement. Should Designer make an application for an extension of time, Designer shall submit evidence that the insurance policies required by this Agreement remain in effect during the requested additional period of time.

3.8 Additional Designer Services.

3.8.1 Request for Services. At City’s request, Designer may be asked to perform services not otherwise included in this Agreement, not included within the basic services listed in Exhibit “A” attached hereto, and/or not customarily furnished in accordance with generally accepted design practice.

3.8.2 Definition. As used herein, “Additional Services” mean: (1) any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary for the Designer to perform at the execution of this Agreement; or (2) any work listed as Additional Services in Exhibit “A” attached hereto. Designer shall not perform, nor be compensated for, Additional Services without prior written authorization from City and without an agreement between the City and Designer as to the compensation to be paid for such services. City shall pay Designer for any approved Additional Services, pursuant to the compensation provisions herein, so long as such services are not made necessary through the fault of Designer pursuant to the indemnification provision of this Agreement.

3.8.3 Examples of Additional Services. Such Additional Services shall not include any redesign or revisions to drawings, specifications or other documents when such revisions are necessary in order to bring such documents into compliance with applicable laws, rules, regulations or codes of which Designer was aware or should have been aware pursuant Packet Page. 922
8 to the laws and regulations provision of this Agreement above. Such Additional Services may include, but shall not be limited to:
(a) Separately Bid Portions of Project. Plan preparation and/or administration of work on portions of the Project separately bid. (b) Furniture and Interior Design. Assistance to City, if requested, for the selection of moveable furniture, equipment or articles which are not included in the Construction Documents.
(c) Fault of Contractor. Services caused by delinquency, default or insolvency of contractor, or by major defects in the work of the contractor, provided that any such services made necessary by the failure of Designer to detect and report such matters when it reasonably should have done so shall not be compensated. (d) Inconsistent Approvals or Instructions. Revisions in drawings, specifications or other documents when such revisions are inconsistent with written approvals or instructions previously given and are due to causes beyond the control of Designer. (e) Legal Proceedings. Serving as an expert witness on City's behalf or attending legal proceedings to which the Designer is not a party. (f) Damage Repair. Supervision of repair of damages to any structure.
(g) Extra Environmental Services. Additional work required for environmental conditions (e.g. asbestos or site conditions) not already contemplated within the Designer's services for the Project.

3.9 City Responsibilities. City’s responsibilities shall include the following:

3.9.1 Data and Information. City shall make available to Designer all necessary data and information concerning the purpose and requirements of the Project, including scheduling and budget limitations, objectives, constraints and criteria. As part of the budget limitation information, the City shall provide the Designer with a preliminary construction budget (“City’s Preliminary Construction Budget”).

3.9.2 Project Survey. If required pursuant to the scope of the Project and if requested by Designer, City shall furnish Designer with, or direct Designer to procure at City’s expense, a survey of the Project site prepared by a registered surveyor or civil engineer, any other record documents which shall indicate existing structures, land features, improvements, sewer, water, gas, electrical and utility lines, topographical information and boundary dimensions of the site, and any other such pertinent information.

3.9.3 Bid Phase. Distribute Construction Documents to bidders and conduct the opening and review of bids for the Project.

3.9.4 Testing. Retain consultant(s) to conduct chemical, mechanical, soils, geological or other tests required for proper design of the Project, and furnish such surveys, borings, test pits, and other tests as may be necessary to reveal conditions of the site which Packet Page. 923
9 must be known to determine soil condition or to ensure the proper development of the required drawings and specifications.

3.9.5 Required Inspections and Tests. Retain consultant(s) to conduct materials testing and inspection or environmental/hazardous materials testing and inspection pursuant to any applicable laws, rules or regulations.

3.9.6 Fees of Reviewing or Licensing Agencies. Directly pay or reimburse the payment of all fees required by any reviewing or licensing agency, or other agency having approval jurisdiction over the Project.

3.9.7 City’s Representative. The City hereby designates the Director of Public Works or his or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Representative hereby designates Azzam Jabsheh, City Engineer or his or her designee, as the City’s contact for the implementation of the Services hereunder. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.9.8 Review and Approved Documents. Review all documents submitted by Designer, including change orders and other matters requiring approval by the City Council or other officials. City shall advise Designer of decisions pertaining to such documents within a reasonable time after submission, so as not to cause unreasonable delay as provided in the excusable delay provisions of this Agreement above.

3.10 Compensation.

3.10.1 Designer’s Compensation for Basic Services. City shall pay to Designer, for the performance of all Services rendered under this Agreement, the total not to exceed amount of Five Hundred Forty-Nine Thousand Nine Hundred Sixty-Seven Dollars and FiftySeven Cents ($549,967.57) (“Total Compensation”). This Total Compensation amount shall be based upon, and may be adjusted according to, the fee schedule and related terms and conditions attached hereto as Exhibit “B” and incorporated herein by reference. The Total Compensation, as may be adjusted upon mutual agreement, shall constitute complete and adequate payment for Services under this Agreement.

3.10.2 Payment for Additional Services. At any time during the term of this Agreement, City may request that Designer perform Additional Services. As used herein, Additional Services means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Any additional work in excess of this amount must be approved by the City. If authorized, such Additional Services will be compensated at the rates and in the manner set forth in Exhibit “C” attached hereto and incorporated herein by reference, unless a flat rate or some other form of compensation is mutually agreed upon by the parties. If City requires Designer to hire consultants to perform any Additional Services, Designer shall be compensated therefore at the rates and in the manner set forth in Exhibit “C” attached hereto and incorporated herein by reference, unless a flat rate or some other form of compensation is mutually agreed upon by the parties. City shall have the authority to review and approve the rates of any such consultants. In addition, Designer shall be reimbursed for any expenses incurred by such consultants pursuant to the terms and conditions of Section

3.10.3. Packet Page. 924
10 3.10.3 Reimbursable Expenses. Reimbursable expenses are in addition to compensation for the Services and Additional Services. Designer shall not be reimbursed for any expenses unless authorized in writing by City, which approval may be evidenced by inclusion in Exhibit “C” attached hereto. Such reimbursable expenses shall include only those expenses which are reasonably and necessarily incurred by Designer in the interest of the Project. Designer shall be required to acquire prior written consent in order to obtain reimbursement for the following: (1) extraordinary transportation expenses incurred in connection with the Project; (2) out-of-town travel expenses incurred in connection with the Project; (3) fees paid for securing approval of authorities having jurisdiction over the Project; (4) bid document duplication costs in excess of $1,000; and (5) other costs, fees and expenses in excess of $1,000.

3.10.4 Payment to Designer. Designer’s compensation and reimbursable expenses shall be paid by City to Designer no more often than monthly. Such periodic payments shall be made based upon the percentage of work completed, and in accordance with the phasing and funding schedule provided in Exhibit “B” and the compensation rates indicated in Exhibit “C” attached hereto and incorporated herein by reference. In order to receive payment, Designer shall present to City an itemized statement which indicates Services performed, percentage of Services completed, method for computing the amount payable, and the amount to be paid at the address listed in Section 3.29. The statement shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement, as well as those expenses for which reimbursement is requested for that statement period. The amount paid to Designer shall never exceed the percentage amounts authorized by the phasing and funding schedule located in Exhibit “B” attached hereto. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner.

Payments made for Additional Services shall be made in installments, not more often than monthly, proportionate to the degree of completion of such services or in such other manner as the parties shall specify when such services are agreed upon, and in accordance with any authorized fee or rate schedule. In order to receive payment, Designer shall present to City an itemized statement which indicates the Additional Services performed, percentage of Additional Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Additional Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner.

Upon cancellation or termination of this Agreement, Designer shall be compensated as set forth in the termination provision herein.

3.10.5 Withholding Payment to Designer. The City may withhold payment, in whole or in part, to the extent reasonably necessary to protect the City from claims, demands, causes of action, costs, expenses, liabilities, losses, damages, or injuries of any kind to the extent arising out of or caused by the negligence, recklessness, or willful misconduct protected under the indemnification provisions of this Agreement. Failure by City to deduct any sums from a progress payment shall not constitute a waiver of the City’s right to such sums. The City may Packet Page. 925
11 keep any moneys which would otherwise be payable at any time hereunder and apply the same, or so much as may be necessary therefor, to the payment of any expenses, losses, or damages as determined by the City, incurred by the City for which Designer is liable under the Agreement or state law. Payments to the Designer for compensation and reimbursable expenses due shall not be contingent on the construction, completion or ultimate success of the Project. Payment to the Designer shall not be withheld, postponed, or made contingent upon receipt by the City of offsetting reimbursement or credit from parties not within the Designer’s reasonable control.

3.10.6 Prevailing Wages. Designer is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Designer agrees to fully comply with and to require its consultants to fully comply with such Prevailing Wage Laws. City shall provide Designer with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Designer shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Designer’s principal place of business and at the Project site. Designer shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure of the Designer or its consultants to comply with the Prevailing Wage Laws. It shall be mandatory upon the Designer and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.10.7 Registration. If the Services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Designer and all subconsultants performing such Services must be registered with the Department of Industrial Relations. Designer shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.10.8 Labor Compliance. This Project may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Designer’s sole responsibility to comply with all applicable registration and labor compliance requirements.

Any stop orders issued by the Department of Industrial Relations against Designer or any subcontractor that affect Designer’s performance of Services, including any delay, shall be Designer’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Designer caused delay and shall not be compensable by the City. Designer shall defend, indemnify and hold the City, its officials, officers, employees and agents free and Packet Page. 926
12 harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Designer or any subcontractor.

3.11 Notice to Proceed.

Designer shall not proceed with performance of any Services under this Agreement unless and until the City provides a written notice to proceed.

3.12 Termination, Suspension and Abandonment.

3.12.1 Grounds for Termination; Designer’s Termination for Cause. City hereby reserves the right to suspend or abandon, at any time and for any reason, all or any portion of the Project and the construction work thereon, or to terminate this Agreement at any time with or without cause. Designer shall be provided with at least seven (7) days advanced written notice of such suspension, abandonment or termination. In the event of such suspension, abandonment or termination, Designer shall be paid for Services and reimbursable expenses rendered up to the date of such suspension, abandonment or termination, pursuant to the schedule of payments provided for in this Agreement, less any claims against or damages suffered by City as a result of the default, if any, by Designer. Designer hereby expressly waives any and all claims for damages or compensation arising under this Agreement, except as set forth herein, in the event of such suspension, abandonment or termination. Designer may terminate this Agreement for substantial breach of performance by the City such as failure to make payment to Designer as provided in this Agreement.

3.12.2 City’s Suspension of Work. If Designer’s Services are suspended by City, City may require Designer to resume such Services within ninety (90) days after written notice from City. When the Project is resumed, the Total Compensation and schedule of Services shall be equitably adjusted upon mutual agreement of the City and Designer.

3.12.3 Documents and Other Data. Upon suspension, abandonment or termination, Designer shall provide to City all preliminary studies, sketches, working drawings, specifications, computations, and all other Project Documents, as defined below, to which City would have been entitled at the completion of Designer’s Services under this Agreement. Upon payment of the amount required to be paid to Designer pursuant to the termination provisions of this Agreement, City shall have the rights, as provided in this Agreement hereinafter, to use such Project Documents prepared by or on behalf of Designer under this Agreement. Designer shall make such documents available to City upon request and without additional compensation other than as may be approved as a reimbursable expense.

3.12.4 Employment of other Designers. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.13 Ownership and Use of Documents; Confidentiality.

3.13.1 Ownership. All plans, specifications, original or reproducible transparencies of working drawings and master plans, preliminary sketches, design presentation drawings, structural computations, estimates and any other documents prepared pursuant to this Agreement, including, but not limited to, any other works of authorship fixed in any tangible medium of expression such as writings, physical drawings and data magnetically or otherwise recorded on computer diskettes (hereinafter referred to as the “Project Documents”) Packet Page. 927
13 shall be and remain the property of City. Although the official copyright in all Project Documents shall remain with the Designer or other applicable subcontractors or consultants, the Project Documents shall be the property of City whether or not the work for which they were made is executed or completed. Within thirty (30) calendar days following completion of the Project, Designer shall provide to City copies of all Project Documents required by City. In addition, Designer shall retain copies of all Project Documents on file for a minimum of fifteen (15) years following completion of the Project, and shall make copies available to City upon the payment of reasonable duplication costs. Before destroying the Project Documents following this retention period, Designer shall make a reasonable effort to notify City and provide City with the opportunity to obtain the documents.

3.13.2 Right to Use. Designer grants to City the right to use and reuse all or part of the Project Documents, at City’s sole discretion and with no additional compensation to Designer, for the following purposes:
(a) The construction of all or part of this Project.
(b) The repair, renovation, modernization, replacement, reconstruction or expansion of this Project at any time; (c) The construction of another project by or on behalf of the City for its ownership and use;
City is not bound by this Agreement to employ the services of Designer in the event such documents are used or reused for these purposes. City shall be able to use or reuse the Project Documents for these purposes without risk of liability to the Designer or third parties with respect to the condition of the Project Documents, and the use or reuse of the Project Documents for these purposes shall not be construed or interpreted to waive or limit City’s right to recover for latent defects or for errors or omissions of the Designer.

Any use or reuse by City of the Project Documents on any project other than this Project without employing the services of Designer shall be at City’s own risk with respect to third parties. If City uses or reuses the Project Documents on any project other than this Project, it shall remove the Designer’s seal from the Project Documents and hold harmless Designer and its officers, directors, agents and employees from claims arising out of the negligent use or reuse of the Project Documents on such other project.

3.13.3 License. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify or reuse any and all Project Documents and any intellectual property rights therein. Designer shall require any and all subcontractors and consultants to agree in writing that City is granted a non-exclusive and perpetual license for the work of such subcontractors or consultants performed pursuant to this Agreement.

3.13.4 Right to License. Designer represents and warrants that Designer has the legal right to license any and all copyrights, designs and other intellectual property embodied in the Project Documents that Designer prepares or causes to be prepared pursuant to this Agreement. Designer shall indemnify and hold City harmless pursuant to the indemnification provisions of this Agreement for any breach of this Section. Designer makes no such representation and warranty in regard to previously prepared designs, plans, specifications, studies, drawings, estimates or other documents that were prepared by design professionals other than Designer and provided to Designer by City.

Packet Page. 928
14 3.13.5 Confidentiality. All Project Documents, either created by or provided to Designer in connection with the performance of this Agreement, shall be held confidential by Designer to the extent they are not subject to disclosure pursuant to the Public Records Act. All Project Documents shall not, without the written consent of City, be used or reproduced by Designer for any purposes other than the performance of the Services. Designer shall not disclose, cause or facilitate the disclosure of the Project Documents to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Designer which is otherwise known to Designer or is generally known, or has become known, to the related industry shall be deemed confidential. Designer shall not use City’s name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the written consent of City.

3.14 Indemnification.

3.14.1 To the fullest extent permitted by law, Designer shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Designer, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Designer’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Designer's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Designer, the City, its officials, officers, employees, agents, or volunteers.

3.14.2 If Designer’s obligation to defend, indemnify, and/or hold harmless arises out of Designer’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Designer’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Designer, and, upon Designer obtaining a final adjudication by a court of competent jurisdiction, Designer’s liability for such claim, including the cost to defend, shall not exceed the Designer’s proportionate percentage of fault.

3.15 Insurance. Designer shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Designer shall not allow any subconsultant to commence work on any subcontract until it has provided evidence satisfactory to the City that the subconsultant has secured all insurance required under this section.

3.15.1 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, Designer shall, at its expense, procure and maintain in full force and effect for the duration of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Designer agrees to amend, supplement or endorse the policies to do so.

3.15.2 Additional Insured. The City of San Bernardino, its officials, officers, employees, agents, and volunteers shall be named as additional insureds on Designer’s and its Packet Page. 929
15 subconsultants’ policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents.

3.15.3 Commercial General Liability
(a) The Designer shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (b) Coverage for Commercial General Liability insurance shall be at least as broad as the following: Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. Commercial General Liability Insurance must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX) exclusion deleted
(7) Contractual Liability with respect to this Contract (8) Broad Form Property Damage
(9) Independent Consultants Coverage
(c) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(d) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage.
(e) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured.

3.15.4 Automobile Liability
(a) At all times during the performance of the work under this Agreement, the Designer shall maintain Automobile Liability Insurance for bodily injury and Packet Page. 930
16 property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(b) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(c) The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status.
(d) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.

3.15.5 Workers’ Compensation/Employer’s Liability
(a) Designer certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
(b) To the extent Designer has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Designer shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Designer shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this Section.

3.15.6 Professional Liability (Errors and Omissions)
(a) At all times during the performance of the work under this Agreement the Designer shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein. This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Designer. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend.

3.15.7 Privacy/Network Security (Cyber
(a) At all times during the performance of work under this Agreement, the Designer shall maintain privacy/network security insurance, in a form and with insurance companies acceptable to the City, for: (1) privacy breaches, (2) system breaches, (3) denial or loss of service, and (4) the introduction, implantation or spread of malicious software code.

Packet Page. 931
17 3.15.8 Minimum Policy Limits Required
(a) The following insurance limits are required for the Agreement:

Combined Single Limit
Commercial General Liability $2,000,000 per occurrence/ $4,000,000 aggregate for bodily injury, personal injury, and property
damage
Automobile Liability $1,000,000 per occurrence for bodily injury and property damage
Employer’s Liability $1,000,000 per occurrence
Professional Liability $1,000,000 per claim and aggregate (errors and omissions)
(b) Defense costs shall be payable in addition to the limits. (c) Requirements of specific coverage or limits contained in this Section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.

3.15.9 Evidence Required
(a) Prior to execution of the Agreement, the Designer shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.

3.15.10 Policy Provisions Required
(a) Designer shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Designer shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Designer shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(b) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Designer’s policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss.

Packet Page. 932
18 (c) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Designer shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Designer shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement.
(d) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Designer or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Designer hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(e) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.

Further the limits set forth herein shall not be construed to relieve the Designer from liability in excess of such coverage, nor shall it limit the Designer’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.

3.15.11 Qualifying Insurers
(a) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements: Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

3.15.12 Additional Insurance Provisions
(a) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Designer, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Designer pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(b) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Designer or City will withhold amounts sufficient to pay premium from Designer payments. In the alternative, City may cancel this Agreement.
(c) The City may require the Designer to provide complete copies of all insurance policies in effect for the duration of the Project.

Packet Page. 933
19 (d) Neither the City nor the City Council, nor any member of the City Council, nor any of the officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.

3.15.13 Subconsultant Insurance Requirements
(a) Designer shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Designer, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

3.16 Records.

Designer shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable.

Designer shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Designer shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of five (5) years from the date of final payment under this Agreement.

3.17 Standardized Manufactured Items.

Designer shall cooperate and consult with City in the use and selection of manufactured items on the Project, including but not limited to, paint, hardware, plumbing, mechanical and electrical equipment, fixtures, roofing materials and floor coverings. All such manufactured items shall be standardized to City’s criteria to the extent such criteria do not interfere with building design.

3.18 Limitation of Agreement.

This Agreement is limited to and includes only the work included in the Project described herein. Any additional or subsequent construction at the site of the Project, or at any other City site, will be covered by, and be the subject of, a separate Agreement for design services between City and the designer chosen therefor by City.

3.19 Mediation.

Disputes arising from this Agreement may be submitted to mediation if mutually agreeable to the parties hereto. The type and process of mediation to be utilized shall be subject to the mutual agreement of the parties.

3.20 Successors and Assigns.

This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each party to this Agreement. However, Designer shall not assign or transfer by operation of law or otherwise any or all of its rights, Packet Page. 934
20 burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

3.21 Asbestos Certification.

Designer shall certify to City, in writing and under penalty of perjury, that to the best of its knowledge, information and belief no asbestos-containing material or other material deemed to be hazardous by the state or federal government was specified as a building material in any construction document that the Designer prepares for the Project. Designer shall require all consultants who prepare any other documents for the Project to submit the same written certification. Designer shall also assist the City in ensuring that contractors provide City with certification, in writing and under penalty of perjury, that to the best of their knowledge, information and belief no material furnished, installed or incorporated into the Project contains asbestos or any other material deemed to be hazardous by the state or federal government.

These certifications shall be part of the final Project submittal. Designer shall include statements in its specifications that materials containing asbestos or any other material deemed to be hazardous by the state or federal government are not to be included.

3.22 No Third Party Rights.

This Agreement shall not create any rights in, or inure to the benefits of, any third party except as expressly provided herein.

3.23 Governing Law.

This Agreement shall be construed in accordance with, and governed by, the laws of the State of California. Venue shall be in San Bernardino County.

3.24 Exhibits and Recitals.

All exhibits and recitals contained herein and attached hereto are material parts of this Agreement and are incorporated as if fully set forth.

3.25 Severability.

Should any provision in the Agreement be held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall continue in full force and effect.

3.26 Non-Waiver.

None of the provisions of this Agreement shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.27 Safety.

Designer shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Designer shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of its employees, consultant and subcontractors appropriate to the nature of the work and the conditions under which the work is to be performed.

Packet Page. 935
21 3.28 Harassment Policy.

Designer shall provide a copy of the City's Harassment Policy to each of its employees assigned to perform the tasks under this Agreement. Designer shall submit to the City's Personnel Manager a statement signed by each of its employees who are assigned to perform the Services under this Agreement certifying receipt of City's Harassment Policy and certifying that they have read the Harassment Policy. A finding by the City that any of Designer's employees has harassed a City employee shall be grounds for appropriate discipline, up to and including such employee's removal from performance of this Agreement at City's request.

3.29 Delivery of Notices.

All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

CITY:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, California 92401
Attn: Azzam Jabsheh, City Engineer
With a Copy to:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: City Attorney
DESIGNER:

TR Design Group, Inc.
2900 Adams St., Studio A-400
Riverside, CA 92504
Attn: Thomas Riggle, President
Such notice shall be deemed made when personally delivered or when mailed, fortyeight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.30 Time of Essence.

Time is of the essence for each and every provision of this Agreement.

3.31 City’s Right to Employ Other Consultants.

City reserves right to employ other consultants, including designers, in connection with this Project or other projects.

3.32 Prohibited Interests.

Packet Page. 936
22 3.32.1 Solicitation. Designer maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Designer, to solicit or secure this Agreement. Further, Designer warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Designer, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability.

3.32.2 Conflict of Interest. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.33 Equal Opportunity Employment.

Designer represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or any other classification protected by federal or state law.

Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Designer shall also comply with all relevant provisions of City’s minority business enterprise program, affirmative action plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.34 Labor Certification.

By its signature hereunder, Designer certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.35 Subcontracting.

As specified in this Agreement, Designer shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to each and every provision of this Agreement.

3.36 Supplemental Conditions.

Any supplemental conditions shall be attached as an exhibit to this Agreement, and that exhibit shall be incorporated herein by reference.

3.37 Electronic Signature.

Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature.

3.38 Entire Agreement.

Packet Page. 937
23 This Agreement, with its exhibits, contains the entire agreement of the parties hereto, and supersedes any and all other prior or contemporaneous negotiations, understandings and oral or written agreements between the parties hereto. Each party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. Furthermore, any modification of this Agreement shall only be effective if in writing signed by all parties hereto. [SIGNATURES ON FOLLOWING PAGE]
Packet Page. 938
24 SIGNATURE PAGE FOR DESIGN SERVICES AGREEMENT

BETWEEN THE CITY OF SAN BERNARDINO
AND TR DESIGN GROUP, INC.

IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the date first written above.

CITY OF SAN BERNARDINO
APPROVED BY:

Rochelle Clayton, City Manager
ATTESTED BY:

Genoveva Rocha, CMC, City Clerk
APPROVED AS TO FORM:

Best Best & Krieger LLP
City Attorney
TR DESIGN GROUP, INC.

Signature

Name

Title
Packet Page. 939
Exhibit C-1
Packet Page. 940
© 2024 TR DESIGN GROUP, INC. ALL RIGHTS RESERVED
RFP F-24-1009

POLICE STATION LOCKER ROOM

RENOVATION

CITY OF SAN BERNARDINO
201 N. E STREET, 2ND FLOOR
SAN BERNARDINO, CA 92401
ATTN: PURCHASING DIVISION

TR DESIGN GROUP, ARCHITECTURE
2900 ADAMS STREET, STUDIO A-400, RIVERSIDE, CA 92504
(951) 742-7179
Packet Page. 941
RE: RFP F-24-1009 POLICE STATION LOCKER ROOM RENOVATION Sincerely,
Thomas Riggle, Architect, NCARB, AIA (authorized to submit this proposal) President
Dear Eddie,
WE’VE DONE THIS BEFORE
Thank you for this opportunity. We are a seasoned architectural team with a track record of over two decades in the industry, led by a team of experienced Architects with a collective background spanning over a hundred years.

We are currently just completing construction on the Fountain Valley Police Dept. locker room, restrooms, gym and forensics lab project. This is very similar to your project in that it is within the secured area of the building and is also on the second floor, creating some additional challenges.

We were also the architects for the Aviation Division Headquarters for the San Bernardino County Sheriff. The project included 12,500 SF of locker and shower facilities, similar to your project.

BROAD PUBLIC AGENCY EXPERIENCE
Approximately 50% of our work annually is public / agency work. As such, we are familiar with Code and Accessibility requirements as well as public bidding, grant, and Prevailing Wage issues.

We also have a California Certified Access Specialist (CASp) on-staff.

Additionally, we’ve completed a number of Public Safety projects including police facilities, fire stations, and gym facilities.

QUALITY PROJECTS : ON-TIME DELIVERY
It is what we are about and how we approach each project.

We work to develop strong Client-Architect relationships based on trust and integrity.

We are ready to go!
With your approval, we can get started right away.

July 18, 2024

EXECUTIVE SUMMARY
1 Eddie Mendez, Principal Engineer
City of San Bernardino
Public Works Department Engineering Division
201 N. E Street, 2nd Flr, San Bernardino, CA 92401
P: (909) 384-5140 ext. 3608
[email protected]
Thomas Riggle, President Main Contact
TR Design Group, Inc. (Legal Name)
2900 Adams St., Studio A-400, Riverside, CA 92504
p: (951) 742-7179
[email protected]
Packet Page. 942

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY

2. TABLE OF CONTENTS

3. FIRM IDENTIFICATION

4. STAFFING RESOURCES
A. FIRM STAFFING & KEY PERSONNEL
B. SUBCONTRACTORS

5. FISCAL STABILITY

6. EXPERIENCE & TECHNICAL

COMPETENCE
A. EXPERIENCE
B. PROJECT SPECIFIC EXPERIENCE
C. TECHNICAL COMPETENCE

7. APPROACH

8. FEE PROPOSAL

9. INSURANCE

10. LITIGATION

11. OTHER INFORMATION

12. CERTIFICATION OF

PROPOSAL

13. APPENDIX 2
Packet Page. 943
TR Design Group, Inc. is an award-winning, full-service, quality architecture and design firm. Beginning in 1999 with the now-president, Thomas Riggle, the firm is a
California S-Corporation incorporated in 2005. Our
legal name is TR Design Group, Inc. dba as TR Design
Group, Architecture.

Contact and Company address:

Thomas Riggle, President
2900 Adams Street, Studio A-400
Riverside, CA 92504
(951) 742-7179
www.trdesigngroup.com
CA Business Lic# 2779304
DIR# PW-LR-1000755224 / Small Bus. #58922
We have experience and history throughout Southern
California. Our firm has a staff of 10 employees. Your
main contacts will be licensed architects with significant depth and maturity. Our experience includes various
Public Safety projects for these agencies / divisions:

Riverside County Sheriff Riverside County DA
Riv. Co. SWJC Juv. Court City of Fountain Valley PD
City of Hemet Fire City of Temecula Fire
City of Menifee Fire City of Riverside
SCCC Fire District City of Moreno Valley PD
Riv. Co. Larry D. Smith Correctional Facility
SBIAA - Sheriff’s Aviation Division
We are very familiar with public bidding, prevailing
wage requirements and agency driven projects.

Additionally, many of our agency projects were/are
grant funded projects requiring deadline adherence to
maintain funding. We met all critical initial deadlines to maintain their funding.

We have extensive public project experience, spanning
over 20 years, which will provide the City of San
Bernardino with a strong Architectural resource on your Police Station Locker Room Renovation project.

FIRM IDENTIFICATION
3 Packet Page. 944
Our team of 11 has tremendous depth and strength. From design, to detailing and into construction, your project will be lead by experienced Architects. Our team also includes a Certified Access Specialist (CASp).

Following is an overview of our key staff.

Thomas Riggle, AIA President, Architect of Record, Design & Direction / Contact during Contracts Skills and responsibilities: Design and direction; contract negotiations; presentations; leadership Relevant experience: With 35 years’ of experience, Thomas has successfully led numerous significant projects through Program, Design and into Construction.

Xavier Adrian Senior Project Manager
Skills and responsibilities: Project Management, Construction Administration, Permitting Relevant experience: Xavier has over 30 years’ experience in Architecture. He has lead his own design firm and been actively involved in construction projects of various scales including a recent $ 39M private project. Additionally, he has completed projects for the City Halls at Glendale, Santa Monica and Commerce.

James Horecka, AIA, CASp Production Manager / Senior Architect / QA & Accessibility Review Skills and responsibilities: Drawings Production, QA/QC review at each phase, Code Research, constructibility and accessibility reviews.

Relevant experience: James has over 40 years’ experience in Architecture. Past projects include public venues, accessibility compliance projects, commercial and institutional projects. He is currently working on several accessibility-related projects for the County of Riverside.

Richard Jaeger, AIA Senior Architect
Skills and responsibilities: Design, BIM, construction documents, code analysis, consultant coordination, and project flow
Relevant experience: Rick has over 35 years’ experience in Architecture. Past projects include City Halls, libraries, community centers, educational environments, and office projects.

Related projects: Temecula Fire Sta. No. 73 renovation, SBIAA Sheriff’s Aviation Facility, SCCCFD Fire Sta.’s Los Altos, Los Gatos & Seven Springs

STAFFING RESOURCES
Firm Staffing & Key Personnel a.
4 Packet Page. 945
resume
TR Design Group, Inc.’s founder has over 34 years of
experience in agency, civic, cultural and educational
projects. He is responsible for all projects’ visioning, design and direction as well as overall management of
the firm. He founded TR Design Group in 1999.

Thomas Riggle
President, Architect

AIA, NCARB, USGBC-IE

EDUCATION
Bachelor of Arts in Architecture
Iowa State University 1987

REGISTRATION
Licensed California Architect, #C24877
NCARB Certified 2018
Experience
Police and Fire Experience
▪ SBIAA
Sheriff’s Aviation Division EOC and Offices, SBIAA
San Bernardino
▪ City of Fountain Valley
Fountain Valley Police Dept., Locker/Rest Rooms,
Training Room / Gym, CSI Labratory
▪ City of Moreno Valley
Sunnymead Ranch Fire Station No. 48 Remodel
and Expansion
Sheriff’s Department Traffic Division Offices
Sheriff’s Department Ballistic Glass / Lobby TI
▪ City of Menifee
Fire Station No. 68 Remodel and Expansion
▪ County of Riverside
Sheriff’s Department Offices, Banning
Larry D. Smith Warehouse, Banning
District Attorney’s Offices, Banning
District Attorney’s Offices, Riverside
Southwest Justice Center Juvenile /Dependency
Court
▪ City of Hemet
Fire Station No. 1 - Remodel
Fire Station No. 2 - Remodel
Fire Station No. 3 - Remodel
▪ Santa Clara County Central Fire Protection District
Los Gatos Fire Station - Remodel
Cupertino Fire Station - Remodel
Los Altos Fire Station - Remodel
Other Public Agency Projects
▪ City of Riverside
311 Call Center ▪ Fountain Valley Police TI
▪ Fountain Valley, CA
Packet Page. 946
Xavier has over 30 years’ experience in Architecture.

He has worked with municipalities in the greater
LA area, City of Anaheim, City of Avalon, City of
Commerce, City of Glendale, City of Hermosa Beach,
City of Pasadena, City of Santa Monica, Town of Apple
Valley, and the County of San Bernardino. He joined
the TR Design team in March.

Xavier Adrian
Senior Project Manager
resume
▪ County of Beaumont
City Hall Additon
▪ County of San Bernardino
New Corporate Yard, Apple Valley
▪ City of Glendale
Community Redevelopment Building
Police Museum
City Hall & Council Chambers Renovations
Park Restrooms
Glendale Civic Auditorium Renovation
▪ County of Commerce
Central Library Major Renovation
Council Chambers Renovations
▪ City of Santa Monica
City Hall Offices Renovation
Public Park Restrooms
Beach Restrooms
▪ City of Hermosa Beach
Park Restrooms
Public Works Yard
Beach Restrooms
Community Center Renovations
▪ Sunrise Peace Center
New Church, Rialto
▪ LSSSC
A new Community Wellness Campus
▪ Real Journies Academies
Entrepreneur High School, Fontana
New Vision Middle School

EDUCATION
Bachelor of Arts in Architecture
Sci-ARC

REGISTRATION
USGBC-IE, Government Affairs AIA-IE,
Member American Library Association
Experience
Packet Page. 947
resume
James has over 40 years’ experience and a
subject matter expert in the following: Disabled
access compliance, means of egress, architectural
building codes, Cal-OSHA, specialty roofing and
constructibility. James’ will provide technical direction during construction drawings as well as QC Reviews.

James Horecka
Senior Architect, AIA, CASp

QA / QC

EDUCATION
Bachelor of Arts in Architecture
California Polytechnic State University SLO 1983

REGISTRATION
Licensed California Architect, #C23689
Certified Access Specialist Cert. #CASp-951
Experience
▪ Lutheran Social Services
Community Wellness Campus for Homeless,
San Bernardino
▪ County of San Bernardino
Lucerne Valley Community Center Renovation
▪ County of Riverside
First 5 Tenant Improvements / Expansion
2nd Floor District Attorney’s Office TI
4th Floor CAC Restrooms TI
▪ City of Temecula
Ronald Reagan Sports Park Accessibility
Upgrades
▪ Disneyland
Park-wide Accessibility and Compliance
Fantasyland & Hyperion Theaters, Toontown
Walt’s Apartment, Star Wars Galaxy’s Edge
Specialized Fall Protection and OSHA
Production Shops and Storage
▪ CASp / Peer Review Experience:

Rancho Bernardo Public Library
Park-wide Accessibility, Disneyland
Restroom Assessments, Disneyland
Golden Triangle Medical, Murrieta
▪ Private
Doctor’s Medical Park Buildings, Temecula
Plaza Rio Vista Medical Offices, Temecula
Print Shop Building, Romoland
Multi-Tenant Office Buildings
Industrial Buildings, Murrieta
Nemax Industrial Park, Murrieta
Autopia, Murrieta
Packet Page. 948
resume
Rick is a quality designer as well as an experienced
technical Architect who will coordinate all phases
of the construction drawings. His calm demeanor
and methodical approach are valuable traits for
preparing clear and thorough construction drawing
packages. He joined TR Design Group in 2007.

Richard Jaeger
Project Architect, AIA,
ICC - B3

EDUCATION
Bachelor of Arts in Architecture
Cal State Long Beach 2013

REGISTRATION
Licensed California Architect, #C34066
ICC - B3 Certified Building Plans Examiner
Experience
▪ City of Fountain Valley
Police Station Locker Rooms & Restrooms,
Training Room / Gym, CSI Laboratory
▪ County of Riverside
Banning DA Office Renovation
Parks Dept. HQ Renovation and Expansion
Woodcrest Library Expansion
RCIC 1st Floor Tenant Improvements
RCIC 4th Floor Tenant Improvements
EDA Health Lab
▪ City of Riverside
Bourns Youth Innovation Center
Ysamel Villegas Community Center
Dales Sr. Center Renovation
▪ City of Temecula
Fire Station 73 Gym and Apparatus Bay
▪ City of Menifee
Fire Station 68 Renovation and Expansion
▪ Santa Clara County
Los Gatos Fire Station Kitchen Remodel
Seven Springs Fire Station Kitchen Remodel
Los Altos Fire Station Kitchen Remodel
▪ City of Moreno Valley
New Marquee Sign
Iris Brnach Library
▪ City of Hemet
Fire Stations 1, 2 & 3 Kitchen Renovations
▪ Riverside-Corona Resource Conservation District
New Agricultural Field Office
▪ County of San Bernardino
Trona Library Renovation
Packet Page. 949
Subcontractors b.

STRUCTURAL ENGINEERING
DCSE Associates, Inc.
1744 W. Katella Ave., Ste. 107, Orange, CA 92687 (714) 997-1145 Contact: Winnie Sullivan

MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING
Design West Engineers
412 E. Vanderbilt Way, San Bernardino, CA 92408 (909) 890-3700 Contact: Steven Johnson, Dir. of Mechanical / P.E.

PHOTO DOCUMENTATION
OC View, LLC - Multivista
1730 East Holly Ave., Ste. 730, El Segundo, CA 90245 (310) 963-6061 Contact: Jeff Dalglish

COST ESTIMATING
RWCC - Richard Warsinger Construction Consulting
3456 Guido Street, Oakland, CA 94602 (510) 530-5921
Contact: Richard Warsinger

SPECIFICATIONS
HALL | AEC
1239 Belgrave Place, Charolette, NC 28203 (704) 334-2101 Contact: Walter Scarborough, FCSI