© 2024 TR DESIGN GROUP , INC. ALL RIGHTS RESERVED
RFP F-24-1009

POLICE STATION LOCKER ROOM

RENOVATION

CITY OF SAN BERNARDINO
201 N. E STREET, 2ND FLOOR
SAN BERNARDINO, CA 92401
ATTN: PURCHASING DIVISION

TR DESIGN GROUP , ARCHITECTURE
2900 ADAMS STREET, STUDIO A-400, RIVERSIDE, CA 92504
(951) 742-7179

RE: RFP F-24-1009 POLICE STATION LOCKER ROOM RENOVATION Sincerely,
Thomas Riggle, Architect, NCARB, AIA (authorized to submit this proposal) President
Dear Eddie,
WE’VE DONE THIS BEFORE
Thank you for this opportunity. We are a seasoned architectural team with a track record of over two decades in the industry, led by a team of experienced Architects with a collective background spanning over a hundred years.

We are currently just completing construction on the Fountain Valley Police Dept. locker room, restrooms, gym and forensics lab project. This is very similar to your project in that it is within the secured area of the building and is also on the second floor, creating some additional challenges.

We were also the architects for the Aviation Division Headquarters for the San Bernardino County Sheriff. The project included 12,500 SF of locker and shower facilities, similar to your project.

BROAD PUBLIC AGENCY EXPERIENCE
Approximately 50% of our work annually is public / agency work. As such, we are familiar with Code and Accessibility requirements as well as public bidding, grant, and Prevailing Wage issues.

We also have a California Certified Access Specialist (CASp) on-staff.

Additionally, we’ve completed a number of Public Safety projects including police facilities, fire stations, and gym facilities.

QUALITY PROJECTS : ON-TIME DELIVERY
It is what we are about and how we approach each project.

We work to develop strong Client-Architect relationships based on trust and integrity.

We are ready to go!
With your approval, we can get started right away.

July 18, 2024

EXECUTIVE SUMMARY
1 Eddie Mendez, Principal Engineer
City of San Bernardino
Public Works Department Engineering Division
201 N. E Street, 2nd Flr, San Bernardino, CA 92401
P: (909) 384-5140 ext. 3608
[email protected]
Thomas Riggle, President Main Contact
TR Design Group, Inc. (Legal Name)
2900 Adams St., Studio A-400, Riverside, CA 92504
p: (951) 742-7179
[email protected]

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY

2. TABLE OF CONTENTS

3. FIRM IDENTIFICATION

4. STAFFING RESOURCES
A. FIRM STAFFING & KEY PERSONNEL
B. SUBCONTRACTORS

5. FISCAL STABILITY

6. EXPERIENCE & TECHNICAL

COMPETENCE
A. EXPERIENCE
B. PROJECT SPECIFIC EXPERIENCE
C. TECHNICAL COMPETENCE

7. APPROACH

8. FEE PROPOSAL

9. INSURANCE

10. LITIGATION

11. OTHER INFORMATION

12. CERTIFICATION OF

PROPOSAL

13. APPENDIX 2
TR Design Group, Inc. is an award-winning, full-service, quality architecture and design firm. Beginning in 1999 with the now-president, Thomas Riggle, the firm is a
California S-Corporation incorporated in 2005. Our
legal name is TR Design Group, Inc. dba as TR Design
Group, Architecture.

Contact and Company address:

Thomas Riggle, President
2900 Adams Street, Studio A-400
Riverside, CA 92504
(951) 742-7179
www.trdesigngroup.com
CA Business Lic# 2779304
DIR# PW-LR-1000755224 / Small Bus. #58922
We have experience and history throughout Southern
California. Our firm has a staff of 10 employees. Your
main contacts will be licensed architects with significant depth and maturity. Our experience includes various
Public Safety projects for these agencies / divisions:

Riverside County Sheriff Riverside County DA
Riv. Co. SWJC Juv. Court City of Fountain Valley PD
City of Hemet Fire City of Temecula Fire
City of Menifee Fire City of Riverside
SCCC Fire District City of Moreno Valley PD
Riv. Co. Larry D. Smith Correctional Facility
SBIAA - Sheriff’s Aviation Division
We are very familiar with public bidding, prevailing
wage requirements and agency driven projects.

Additionally, many of our agency projects were/are
grant funded projects requiring deadline adherence to
maintain funding. We met all critical initial deadlines to maintain their funding.

We have extensive public project experience, spanning
over 20 years, which will provide the City of San
Bernardino with a strong Architectural resource on your Police Station Locker Room Renovation project.

FIRM IDENTIFICATION
3 Our team of 11 has tremendous depth and strength. From design, to detailing and into construction, your project will be lead by experienced Architects. Our team also includes a Certified Access Specialist (CASp).

Following is an overview of our key staff.

Thomas Riggle, AIA President, Architect of Record, Design & Direction / Contact during Contracts Skills and responsibilities: Design and direction; contract negotiations; presentations; leadership Relevant experience: With 35 years’ of experience, Thomas has successfully led numerous significant projects through Program, Design and into Construction.

Xavier Adrian Senior Project Manager
Skills and responsibilities: Project Management, Construction Administration, Permitting Relevant experience: Xavier has over 30 years’ experience in Architecture. He has lead his own design firm and been actively involved in construction projects of various scales including a recent $ 39M private project. Additionally, he has completed projects for the City Halls at Glendale, Santa Monica and Commerce.

James Horecka, AIA, CASp Production Manager / Senior Architect / QA & Accessibility Review Skills and responsibilities: Drawings Production, QA/QC review at each phase, Code Research, constructibility and accessibility reviews.

Relevant experience: James has over 40 years’ experience in Architecture. Past projects include public venues, accessibility compliance projects, commercial and institutional projects. He is currently working on several accessibility-related projects for the County of Riverside.

Richard Jaeger, AIA Senior Architect
Skills and responsibilities: Design, BIM, construction documents, code analysis, consultant coordination, and project flow
Relevant experience: Rick has over 35 years’ experience in Architecture. Past projects include City Halls, libraries, community centers, educational environments, and office projects.

Related projects: Temecula Fire Sta. No. 73 renovation, SBIAA Sheriff’s Aviation Facility, SCCCFD Fire Sta.’s Los Altos, Los Gatos & Seven Springs

STAFFING RESOURCES
Firm Staffing & Key Personnel a.
4 resume
TR Design Group, Inc.’s founder has over 34 years of
experience in agency, civic, cultural and educational
projects. He is responsible for all projects’ visioning, design and direction as well as overall management of
the firm. He founded TR Design Group in 1999.

Thomas Riggle
President, Architect

AIA, NCARB, USGBC-IE

EDUCATION
Bachelor of Arts in Architecture
Iowa State University 1987

REGISTRATION
Licensed California Architect, #C24877
NCARB Certified 2018
Experience
Police and Fire Experience
▪ SBIAA
Sheriff’s Aviation Division EOC and Offices, SBIAA
San Bernardino
▪ City of Fountain Valley
Fountain Valley Police Dept., Locker/Rest Rooms,
Training Room / Gym, CSI Labratory
▪ City of Moreno Valley
Sunnymead Ranch Fire Station No. 48 Remodel
and Expansion
Sheriff’s Department Traffic Division Offices
Sheriff’s Department Ballistic Glass / Lobby TI
▪ City of Menifee
Fire Station No. 68 Remodel and Expansion
▪ County of Riverside
Sheriff’s Department Offices, Banning
Larry D. Smith Warehouse, Banning
District Attorney’s Offices, Banning
District Attorney’s Offices, Riverside
Southwest Justice Center Juvenile /Dependency
Court
▪ City of Hemet
Fire Station No. 1 - Remodel
Fire Station No. 2 - Remodel
Fire Station No. 3 - Remodel
▪ Santa Clara County Central Fire Protection District
Los Gatos Fire Station - Remodel
Cupertino Fire Station - Remodel
Los Altos Fire Station - Remodel
Other Public Agency Projects
▪ City of Riverside
311 Call Center

▪ Fountain Valley Police TI
▪ Fountain Valley, CA
Xavier has over 30 years’ experience in Architecture.

He has worked with municipalities in the greater
LA area, City of Anaheim, City of Avalon, City of
Commerce, City of Glendale, City of Hermosa Beach,
City of Pasadena, City of Santa Monica, Town of Apple
Valley, and the County of San Bernardino. He joined
the TR Design team in March.

Xavier Adrian
Senior Project Manager
resume
▪ County of Beaumont
City Hall Additon
▪ County of San Bernardino
New Corporate Yard, Apple Valley
▪ City of Glendale
Community Redevelopment Building
Police Museum
City Hall & Council Chambers Renovations
Park Restrooms
Glendale Civic Auditorium Renovation
▪ County of Commerce
Central Library Major Renovation
Council Chambers Renovations
▪ City of Santa Monica
City Hall Offices Renovation
Public Park Restrooms
Beach Restrooms
▪ City of Hermosa Beach
Park Restrooms
Public Works Yard
Beach Restrooms
Community Center Renovations
▪ Sunrise Peace Center
New Church, Rialto
▪ LSSSC
A new Community Wellness Campus
▪ Real Journies Academies
Entrepreneur High School, Fontana
New Vision Middle School

EDUCATION
Bachelor of Arts in Architecture
Sci-ARC

REGISTRATION
USGBC-IE, Government Affairs AIA-IE,
Member American Library Association
Experience
resume
James has over 40 years’ experience and a
subject matter expert in the following: Disabled
access compliance, means of egress, architectural
building codes, Cal-OSHA, specialty roofing and
constructibility. James’ will provide technical direction during construction drawings as well as QC Reviews.

James Horecka
Senior Architect, AIA, CASp

QA / QC

EDUCATION
Bachelor of Arts in Architecture
California Polytechnic State University SLO 1983

REGISTRATION
Licensed California Architect, #C23689
Certified Access Specialist Cert. #CASp-951
Experience
▪ Lutheran Social Services
Community Wellness Campus for Homeless,
San Bernardino
▪ County of San Bernardino
Lucerne Valley Community Center Renovation
▪ County of Riverside
First 5 Tenant Improvements / Expansion
2nd Floor District Attorney’s Office TI
4th Floor CAC Restrooms TI
▪ City of Temecula
Ronald Reagan Sports Park Accessibility
Upgrades
▪ Disneyland
Park-wide Accessibility and Compliance
Fantasyland & Hyperion Theaters, Toontown
Walt’s Apartment, Star Wars Galaxy’s Edge
Specialized Fall Protection and OSHA
Production Shops and Storage
▪ CASp / Peer Review Experience:

Rancho Bernardo Public Library
Park-wide Accessibility, Disneyland
Restroom Assessments, Disneyland
Golden Triangle Medical, Murrieta
▪ Private
Doctor’s Medical Park Buildings, Temecula
Plaza Rio Vista Medical Offices, Temecula
Print Shop Building, Romoland
Multi-Tenant Office Buildings
Industrial Buildings, Murrieta
Nemax Industrial Park, Murrieta
Autopia, Murrieta

resume
Rick is a quality designer as well as an experienced
technical Architect who will coordinate all phases
of the construction drawings. His calm demeanor
and methodical approach are valuable traits for
preparing clear and thorough construction drawing
packages. He joined TR Design Group in 2007.

Richard Jaeger
Project Architect, AIA,
ICC - B3

EDUCATION
Bachelor of Arts in Architecture
Cal State Long Beach 2013

REGISTRATION
Licensed California Architect, #C34066
ICC - B3 Certified Building Plans Examiner
Experience
▪ City of Fountain Valley
Police Station Locker Rooms & Restrooms,
Training Room / Gym, CSI Laboratory
▪ County of Riverside
Banning DA Office Renovation
Parks Dept. HQ Renovation and Expansion
Woodcrest Library Expansion
RCIC 1st Floor Tenant Improvements
RCIC 4th Floor Tenant Improvements
EDA Health Lab
▪ City of Riverside
Bourns Youth Innovation Center
Ysamel Villegas Community Center
Dales Sr. Center Renovation
▪ City of Temecula
Fire Station 73 Gym and Apparatus Bay
▪ City of Menifee
Fire Station 68 Renovation and Expansion
▪ Santa Clara County
Los Gatos Fire Station Kitchen Remodel
Seven Springs Fire Station Kitchen Remodel
Los Altos Fire Station Kitchen Remodel
▪ City of Moreno Valley
New Marquee Sign
Iris Brnach Library
▪ City of Hemet
Fire Stations 1, 2 & 3 Kitchen Renovations
▪ Riverside-Corona Resource Conservation District
New Agricultural Field Office
▪ County of San Bernardino
Trona Library Renovation

Subcontractors b.

STRUCTURAL ENGINEERING
DCSE Associates, Inc.
1744 W. Katella Ave., Ste. 107, Orange, CA 92687 (714) 997-1145 Contact: Winnie Sullivan

MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING
Design West Engineers
412 E. Vanderbilt Way, San Bernardino, CA 92408 (909) 890-3700 Contact: Steven Johnson, Dir. of Mechanical / P.E.

PHOTO DOCUMENTATION
OC View, LLC - Multivista
1730 East Holly Ave., Ste. 730, El Segundo, CA 90245 (310) 963-6061 Contact: Jeff Dalglish

COST ESTIMATING
RWCC - Richard Warsinger Construction Consulting
3456 Guido Street, Oakland, CA 94602 (510) 530-5921
Contact: Richard Warsinger

SPECIFICATIONS
HALL | AEC
1239 Belgrave Place, Charolette, NC 28203 (704) 334-2101 Contact: Walter Scarborough, FCSI

FISCAL STABILITY
5 Basis: Accrual
TR Design Group
Profit and Loss Statement

Page 1 ends

Thursday, March 28, 2024
Other Income

TOTAL OTHER INCOME

OTHER INCOME
Other Expenses
Travel & Entertainment
Outside Services
Marketing & Business Development
Professional Services
Business Insurance & Taxes
General Office
Facilities
Payroll Related Expense/Fringe
Bonuses & Incentives
Indirect Labor Cost

TOTAL EXPENSES

EXPENSES

NET OPERATING INCOME
Nonbillable Cost of Services

TOTAL NONBILLABLE COST

NONBILLABLE COST
Billable Cost of Services
Direct Labor

TOTAL BILLABLE COST

BILLABLE COST

TOTAL COST OF SALES

COST OF SALES
Professional Services Billed

TOTAL INCOME
INCOME

GROSS MARGIN

NET INCOME (LOSS)
6,886
6,886
107,203
1,281
32,936
10,466
49,510
50,09 6
66,887
32,350
21 9,767
32,000
280,999
883,496
774,217
572
572
439,3 54
771,028
1,210,382
1,210,954
2,868,667
2,868,667
1,657,713
781,103
YTD Balance

CONFIDENTIAL
12/31/2023
TR Design Group requested but has not yet received our Dun and Bradstreet Credit Report. Additionally, we do not have audited financials. These financials are what was used for our 2023 taxes and we hope they are sufficient to demonstrate our financial stability. We've been in business and profitable consistently since 2003.

FISCAL STABILITY
5 Basis: Accrual
TR Design Group
Balance Sheet
Thursday, March 28, 2024
Assets
12/31/2023
1615 Accumulated Depreciation - PPE -203,447.29
1613 Computer Software 96,324.59
1612 Computer Hardware 123,241.97
1611 Furniture & Fixtures 14,253.60
1610 Fixed Assets 12,293.45
Total Equipment & Fixed Assets 42,666.32
Equipment & Fixed Assets
TOTAL NON-CURRENT ASSET 42,666.32

NON-CURRENT ASSET
1330 Work In Progress - Consultants -966.00
1320 Work In Progress - Expenses -19.50
1310 Work In Progress- Labor 985.50
Total Work In Progress .00
1410 Prepaid Expenses 147.15
1240 Security Deposits 2,934.51
Total Other Current Assets 3,081.66
Other Current Assets
1200 Accounts Receivable 469,725.48
Total Receivables 469,725.48
Receivables
1020 Bank Account - Savings 150,053.94
1010 Bank Account - Checking 37,391.26
Total Cash 187,445.20
Cash
TOTAL CURRENT ASSET 660,252.34

CURRENT ASSET
TOTAL ASSETS $ 702,918.66
Assets
Net Income 781,103.08
3900 Retained Earnings 1,671,521.42
Total Capital 2,452,624.50
Capital
TOTAL RETAINED EARNINGS 2,452,624.50

RETAINED EARNINGS
3800 Paid-in-Capital 127,065.68
3100 Profit Distributions -2,178,690.54
Total Capital -2,051,624.86
Capital
TOTAL EQUITY -2,051,624.86
EQUITY
2002 Salaries Payable 18,588.16
Total Payroll Payables 18,588.16
Payroll Payables
2021 Chase Ink 5630 1,403.00
2000 Accounts Payable 128,855.62
Total Current Payables 130,258.62
Current Payables
2300 Client - Prepaid Retainer 153,072.24
Total Other Current Liabilities 153,072.24
Other Current Liabilities
TOTAL CURRENT LIABILITY 301,919.02

CURRENT LIABILITY
TOTAL LIABILITIES AND EQUITY $ 702,918.66
Liabilities and Equity

CONFIDENTIAL
(i) TR Design Group has all the staff and skills necessary to meet the goals of the City and fulfill the functions to successfully complete this project. Below are various related projects that show our experience and technical competence for both Police and Fire Departments, along
with a University Sports Facility.
(ii)
City of Menifee:
• Fire Station 68 Renovation and Expansion
City of Fountain Valley
• Police Locker Rooms & Restrooms
• Fire Sta. No. 2 Apparatus Bay ** Included Project
Management
City of Moreno Valley:
• Fire Station No. 48 Renovation and Expansion
• Police Traffic Division & Ballistic Glass Public Counter San Bernardino International Airport:
• New Sheriff’s Aviation Facility
City of Temecula:
• Fire Sta 73 Generator Pad, Gym & Apparatus Bay
Santa Clara County Central Fire Protection District
• 3 Fire Station Kitchen Remodels
City of Hemet:
• 3 Fire Station Kitchen Remodels
California Baptist University
• Baseball and Softball Facility
(iii) TR Design Group - 1999 / Incorporated in 2005
(iv) see next page
(v) TR Design Group is currently working with the City of San Bernardino on a $28M project for a new Homeless
Campus for Lutheran Social Services.

EXPERIENCE AND TECHNICAL COMPETENCE
Experience a.
6 SBIAA - Sheriff’s Aviation - A new 55,000 SF maintenance and storage hangars for the rotary and fixed-wing aircraft as well as a 12,500 SF EOC operations facility. New offices, lockers, situation and community rooms for emergency and search and rescue operations. Reference: Mark Gibbs (909) 382-4100 [email protected] (iv)
Fountain Valley Police Dept., Fountain Valley - Major renovation to the Police Department Headquarters including Locker and Restrooms, crime lab, gym, offices, MEP systems, and ADA improvements.

Reference: Temo Galvez (714) 593-4517 [email protected] County of Riverside - Banning District Attorney Offices TI - This 11,500 s.f. remodel included a complete gut and renovation of the existing 1960’s facility. The project was completed record time from initial design to move-in in just under 5 months. Reference: Blanca Limon Project Manager III [email protected]

FOUNTAIN VALLEY POLICE DEPARTMENT
This renovation project came back from bidding with a

0.3% variance in the top 3 bidders and is currently in
construction. It involves new locker rooms, restrooms, CSI Lab and workout room for the Department. Their current
force is over 90 personnel with 62 officers. renovation Project involved Architectural, Accessibility, Mechanical, Plumbing, Electrical and Structural upgrades along with temporary conditions during construction.

Bid: $ 3.4M A&E Fee: $ 307, 258
Project dates: June 2019 - Currently in construction
Contact: Temo Galvez - Deputy Dir. of Public Works
City of Fountain Valley (714) 593-4517
Email: [email protected]
Project Specific Experience b. i.

SAN BERNARDINO INTL. AIRPORT AUTHORITY
SHERIFF’S AVIATION DIVISION
Project included a new 27,500 s.f. maintenance hangar,
a 22,500 s.f. storage hangar and 11,500 s.f. of offices for the new Sheriff’s Aviation Operations Facility. This includes situation and community rooms for emergency
operations and search and rescue operations. The
Sheriff’s operations offices include emergency
communications systems, lockers and weapons storage.

Bid: $10.4M A&E Fee: $ 835,600
Project dates: September 2013 - September 2016
Contact: Mark Gibbs, Director of Aviation
SBIAA (909) 382-410 [email protected]

CALIFORNIA BAPTIST UNIVERSITY BASEBALL AND

SOFTBALL FACILITY
A new approximately 15,000 - 20,000 s.f. field house
athletic building for the University’s Baseball and
Softball teams. It includes extensive lockers, showers and restroom facilities on both levels.

Bid: $ 15.9 M A&E Fee: $ 1.2M
Project dates: April 2022 - Currently in construction
Contact: Mark Howe - VP of Finance & Administration
California Baptist University (951) 343-4211
Email: [email protected]
TR Design Group, Inc. has NOT:
(a) Had a failure to enter into a contract or professional services agreement once selected. (b) Withdrew a proposal as a result of an error.
(c) Terminated or failed to complete a contract.
(d) Been debarred by any municipal, county, state, federal or local agency. (e) Been involved in litigation, arbitration or mediation. As a firm or it’s principals been convicted for violating a state or federal antitrust law by bid or proposal rigging, collusion, or restrictive competition between bidders or proposers, or conviction of violating any other federal or state law related to bidding or professional services performance. Knowingly concealed any deficiency in the performance of a prior contract.
(f) Falsified information or a submission of deceptive or fraudulent statements in connection with a contract.
(g) Had willful disregard for applicable rules, laws or regulations. b. ii.

Technical Competence c.

Teamwork of our multi-disciplinary staff and an integrated effort by our entire architecture and engineering consulting team help us to produce quality sets of drawings, resulting in fewer change orders and an overall lower project cost.

Regarding Technical Competence, we use several technologies to assist in the delivery of projects. Newforma is an integrated project management platform that provides our office with increased communication and organization workflows as well as a databased project history. It also integrates with Procore.

Deltek Ajera provides us with up-to-the-minute project status and progress reports for managing deadlines. We use Revit (BIM) for most projects and Bluebeam Studio, which allows for markup and collaboration between teams in real time.

Your Police Locker room project is fairly straightforward, in that the objectives for it are clear. Renovate the restrooms, update the lockers, finishes and materials, provide as many lockers as possible, and rework the restrooms and showers to meet accessibility requiremetns. Of note, our past experience with projects like this, tell us that both “non-gender” facilities may create a “third” restroom/locker room. And, it will be imnprtant to discuss temporary facilities, as this is key to keeping the department operational while the facility is under construction. We have thoughts for that but will need to review key objectives with you as to security, other facilities within the building, and potentially off-site facilities.

Thankfully, we are well qualified and have completed other projects very similar in scope. We know the steps and can take the ball and run with it. We will develop and deliver a comprehensive project in cooperation with you.

PHASE 01 – PLANNING PHASE / EX. DRAWINGS / CODE REVIEW
Your existing site and building plans are a great place to start. There are important site studies and investigations that need to take place prior to starting Schematic drawings. Additionally, we need to review the Program with you as this will determine what “success” looks like later in the project. We will first meet with you for the kick-off meeting, and to introduce the team. First, we want to meet with and establish a relationship with your team and your Project Manager. Our goal will be to clarify communications, distribution lists and “who to call when”.

We will create a Project Team list and distribute contact information for our team to all appropriate members, including our President, Thomas Riggle’s cell phone number. We will make ourselves available to you and have multiple possible contacts so you can reach one of our team members when it’s urgent. We will analyze the existing conditions, your current design plans, and the related supporting information. Our MEP engineers are in San Bernardino and will meet with us at the site to begin determining Points of Connection and existing services.

We will also then review those drawings and files for constructibility, code and other issues. This will help us to finalize the design. We will have a photo documentation company photo doc the Area of Work.

This will reduce the number of trips needed for information gathering and will be a reference for future work.

PHASE 02 - SCHEMATIC DRAWINGS
Then, with your input and code issues in hand, we will prepare concept drawings that illustrate the potential new layouts and how to improve the locker rooms and restrooms. We will solve the problems and present ideas to you. We will work with you to refine the concepts. After the CIty approves the conceptual floor plan, we will then select materials and finishes and design the spaces. The materials will be provided to you in physical form as well as 3D renderings of the spaces to better illustrate the designs and receive your approval.

APPROACH
7 PHASE 04 CONSTRUCTION DOCUMENTS
From the Schematic Design approval, we will prepare the Construction Documents (drawings and specifications) for bid, permit and construction.

Detailed drawings and schedules will be prepared for Architectural, Structural (very limited), Mechanical, Plumbing and Electrical systems.

Our engineers are right in San Bernardino so site access and driving over to see field conditions is not a concern. We will work with our consultants for inter-disciplinary coordination. At this point we will need final selections for all equipment, furniture and items to be included in the building and/or the General Contractor’s Scope of Work. Green Code requirements, and other Code Requirements will be incorporated into the plans to demonstrate Code Compliance to the AHJ.

QUALITY PLANS
We thoroughly review every set of drawings through our rigorous QAQC. As part of our team, James Horecka will do this review.

He has done QAQC reviews for 40+ years. He is also a Certified Access Specialist, which means he is consistently involved throughout the development of our plans to confirm clearances and accessibility, and carefully reviewing plans for compliance. We are committed to quality and will review the documents for coordination, accessibility and constructibility issues prior to bid with the goal of reducing issues in the field and Change Orders during construction.

PHASE 08 PLAN CHECK SUBMITTAL
We have extensive experience in securing agency approvals and permits and work closely with many agencies. We will start early, meet with Building and Safety, Fire and Public Works and determine their requirements to facilitate a smooth permitting process. We anticipate these plans will be checked by Jim Rossman at the County’s Facilities and not through TLMA. TR Design Group can assist the County in issuing plans for bid, although this was not requested and not currently in the contract. If Project Management is selected this can be included.

Typically the County prepares their front-end and we support that with drawings and specs. Additionally, most agencies post and advertise projects for bid through the bid boards. We will assist during bid for RFI’s and Addenda, if any.

PHOTO DOCUMENTATION (OPTIONAL AND ADDITIONAL)
As part of the service for your project, we have a third-party photo documentation company that will photo doc during construction. This service will include regular on-site GPS enabled location-specific photos and system specific milestone measurable photos. We have included this service for the beginning of the project to document the existing conditions and an optional regular / static photo doc during construction. Clients who have used this service have found it to very be valuable to “see inside” the building after construction is complete.

PHASE 05 CONSTRUCTION BID SUPPORT
We will assist you in issuing the plans for public bid. We will attend the Pre-Bid meeting and be available for RFI’s and Addenda, if needed.

PHASE 06 CONSTRUCTION SUPPORT
We can provide Construction Support up to the hours included in our proposal, including the review of shop drawings and submittals, confirm that products and equipment meet specified requirements.

TR Design Group can review (and challenge) any changes in products and materials for equivalency. Regular site visits and meetings will be attended to review progress and expedite information for the GC. We can also then assist with the punch-list review. We regularly assist agencies with Construction Administration.

PHASE 07 POST CONSTRUCTION SERVICES
We will receive and distribute the as0built drawings from the GC.

From those clear, organized and legible as-builts, we will revise our drawings for the record sets. Any information received from the GC will be provided to the City for your records. Typically the warranty and manuals go direct to the agency.

FEE PROPOSAL
FEE AND PHASING/ FUNDING SCHEDULE B.
8 Principal / Principal Designer $275

Project Architect / Senior Project Manager $225
Architect / Project Manager $195
Permit Specialist / Project Coordinator $180
Job Captain / Senior Draftsman $155

Draftsman $135
Clerical $ 75

ANNUAL INCREASE
An increase of not more than 5% shall be included for multi-year contracts and shall initiate at the beginning of each calendar year.

SUB-CONSULTANT COSTS: All Consultants (if engaged as part of the Scope) including, but not limited to, civil, landscape, structural, mechanical, plumbing and electrical engineering shall be a multiple of one and one and fifteen one-hundredths (1.15) times the amounts billed to the Architect for such services.

REIMBURSABLE EXPENSES
FOR REIMBURSABLE EXPENSES, a multiple of one and fifteen one hundredths (1.15) times the expenses incurred by the architect, the architect’s employees and consultants in the interest of the project. Reimbursable expenses include expenses incurred by the architect in the interest of the project for:

Expense of transportation and living expenses in connection with out-of-town travel authorized by the owner.

Mileage will be billed at the current federal government rate at the time of the expense; conference-call charges for our service at a rate of $25/hour; postage and handling of drawings, specifications and/or documents; fees paid for securing approval of authorities having jurisdiction over the project; reproductions/ blueprint/copies: Cost + 15%. Per-item costs: In-house color copy, 8.5 x 11: $1; in-house color copy, 11x17:
$2. Plotting -- full sheet, $5; half sheet, $1; CD, $2; DVD, $5; high-resolution aerial photos, $50. Expense of overtime work requiring higher-than-regular rates, as authorized. Renderings and models requested by the owner.

ADDITIONAL SERVICES
None

ADDITIONAL CONSULTANTS
None
COMPENSATION RATES AND REIMBURSABLE EXPENSES C.

INSURANCE
9 TR Design Group has no litigation for any claims filed by our firm or against our firm related to the provision of Services in the last five (5) years.

LITIGATION
10 b. COMMUNITY INVOLVEMENT
Community Involvement is not anticipated to be needed for this project, but we have included the meetings as requested with the City and / or departments.
c. PREVIOUS INVOLVEMENT WITH THE CITY
TR Design Group currently has two active projects in the city of San Bernardino, one of which is a grant funded project where the City of San Bernardino is a partner to our client on the project. d. STATEMENT
TR Design Group has no conflicts of interest in connection with providing the Services in this RFP.

The undersigned hereby submits its proposal and, by doing so, agrees to furnish services to the City in accordance with the Request for Proposal (RFP), and to be bound by the terms and conditions of the RFP.

Sincerely,
Thomas Riggle, Architect, NCARB, AIA
President

CERTIFICATION OF PROPOSAL
12 3.15.3 Commercial General Liability (b): “Coverage for Commercial General Liability insurance shall be at least as broad as the following: Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent”. TR Design currently maintains Commercial General Liability insurance with Insurance Services Office BusinessOwners Coverage Form BP 0003 07/13 which may or may not be considered equivalent by the City.

3.15.3 Commercial General Liability (c): “The policy shall contain no endorsements or provisions limiting coverage….or (4) contain any other exclusion contrary to the Agreement. “ There are a number endorsements included in each policy. A complete list of forms and endorsements for each policy is available for review at your request.

3.15.3 Commercial General Liability (d): “The policy shall give City, the City Council and each member of the City Council, its officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage.” TR Design currently maintains general liability insurance with Blanket Additional Insured coverage included in form BP 79 96 09 16 BusinessOwners Liability Extension Endorsement for ongoing operations (i.e CG2010) only. Completed Operations (i.e. CG2037) additional insured coverage may be available for an additional premium subject to carrier approval. We can obtain an insurance quote for completed ops additional insured status at your request.

3.15.4 Automobile Liability (a): “At all times during the performance of the work under this Agreement, the Designer shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.” TR Design currently maintains Hired Auto and Non-Owned Auto Liability coverage. TR Design does not currently have “Owned” auto coverage. If TR Designs, Inc. owns any vehicles, we can obtain an insurance quote to add this coverage at your request.

3.15.4 Automobile Liability (b): “Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).” TR Design currently maintains Auto Liability insurance with Insurance Services Office Coverage Hired Auto (Symbol 8) and Non-Owned Auto Liability (Symbol 9) Form BP 0686 05/17 which may or may not be considered “at least as broad” by the City. TR Design does not currently have owned autos so “any auto” and/or “owned auto” coverage is not available. If TR Designs, Inc. owns any vehicles, we can obtain an insurance quote to add this coverage.

APPENDIX
13 3.15.6 Professional Liability (Errors and Omissions): “…This insurance shall be endorsed to include contractual liability applicable to this Agreement…” TR Design currently maintains Professional Liability coverage with the following exclusion verbiage “Liability of Others Assumed by Contract. The liability of others assumed by any Insured under any contract or agreement unless such liability arises as a result of a Breach of Professional Duty and would have existed absent such contract or agreement.”

3.15.7 Privacy/Network Security (Cyber) (a): “ At all times during the performance of work under this Agreement, the Designer shall maintain privacy/network security insurance, in a form and with insurance companies acceptable to the City, for: (1) privacy breaches, (2) system breaches, (3) denial or loss of service, and (4) the introduction, implantation or spread of malicious software code.” TR Design does not currently maintain separate Cyber Liability coverage to meet these requirements. We can obtain an insurance quote for this coverage at your request.

3.15.8 Aviation and/or Drone Liability (a): “At all times during the performance of the work under this Agreement, the Designer shall maintain Aviation and/or Drone Liability insurance for bodily injury and property damage, in a form and with insurance companies acceptable to the City.” TR Design does not currently have Aviation or Drone Liability coverage. If TR Designs, Inc. owns any aircraft/drones, we can obtain an insurance quote to for this coverage.

3.15.11 Policy Provisions Required (a): “Designer shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Designer shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium.” 30 Day Notice of Cancellation is not available on the Business Owners (Auto) policy. We are able to provide HUB approved 30 Day Notice of Cancellation wording with 10 Days for Non-Payment to the Certificate of Insurance.

DIVERSITY QUESTIONNAIRE

AND GOALS FORM