Quantity Unit Unit Price Total Price Unit Price Total Price

1.1 Mobilization 1 LS 4,500.00$ $4,500.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00

1.2 Traffic Control 1 LS 8,500.00$ $8,500.00 $8,500.00 $8,500.00 $8,500.00 $8,500.00

1.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 14,300.00$
$14,300.00 $14,300.00 $14,300.00 $14,300.00 $14,300.00

1.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression from the NW to the SW As Per The City Modified Standard Drawing #400, and Detail A
250 SF 280.00$ $70,000.00 $280.00 $70,000.00 $280.00 $280.00

1.5 Overlay 2’’ Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 1600 SF 10.75$ $17,200.00 $10.75 $17,200.00 $10.75 $10.75

1.6 Construct Concrete Sidewalk (Panels and Curb) at the NW and SW corners with maximum slope of 2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding of a Circular Drain Lid As Per SPPWC 111-5, and Detail B
900 SF 21.25$ $19,125.00 $21.25 $19,125.00 $21.25 $21.25

1.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00

2.1 Mobilization 1 LS 5,000.00$ $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00

2.2 Traffic Control 1 LS 9,500.00$ $9,500.00 $9,500.00 $9,500.00 $9,500.00 $9,500.00

2.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 17,600.00$
$17,600.00 $17,600.00 $17,600.00 $17,600.00 $17,600.00

2.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression As Per The City Modified Standard Drawing #400, and Detail A
300 SF 280.00$
$84,000.00 $280.00 $84,000.00 $280.00 $280.00

2.5 Mill and Overlay 2’’ Asphalt over the 2-parkway decking and the entire intersection as highlighted in the drawing. 1900 SF 10.00$ $19,000.00 $10.00 $19,000.00 $10.00 $10.00

2.6 Construct Concrete Sidewalk (Panels and Curb) at the 4 corners with maximum slope of

2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding a Circular Drain Lid As Per SPPWC 111-5, and Detail B
800 SF 22.00$
$17,600.00 $22.00 $17,600.00 $22.00 $22.00

2.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 4,300.00$ $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00

3.1 Mobilization 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00

BID SCHEDULE ABID SCHEDULE B
Bid Item and Description

AVERAGE BID VALUES
LOWEST UNIT BID PRICE HIGHEST UNIT BID PRICEGentry General Engineering Inc.

1. BID TABULATION
PROJECT NAME: Storm Drain at Various Locations
PROJECT NO: RFQ F-24-4019

BID TABULATION
Apparent Low Bidder 1

3.2 Traffic Control 1 LS 7,400.00$ $7,400.00 $7,400.00 $7,400.00 $7,400.00 $7,400.00

3.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 13,600.00$ $13,600.00 $13,600.00 $13,600.00 $13,600.00 $13,600.00

3.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression from the NE to the NW As Per The City Modified Standard Drawing #400, and Detail A
200 SF 280.00$
$56,000.00 $280.00 $56,000.00 $280.00 $280.00

3.5 Overlay 2’’Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 1000 SF 14.00$ $14,000.00 $14.00 $14,000.00 $14.00 $14.00

3.6 Construct Concrete Sidewalk (Panels and Curb) at the NE and NW corners with maximum slope of 2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding a Circular Drain Lid As Per SPPWC 111-5, and Detail B
600 SF 24.25$ $14,550.00 $24.25 $14,550.00 $24.25 $24.25

3.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00

4.1 Mobilization 1 LS 3,500.00$ $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00

4.2 Traffic control 1 LS 8,000.00$ $8,000.00 $8,000.00 $8,000.00 $8,000.00 $8,000.00

4.3 Construct PCC cross gutter between the ne corner and NW corner with two PCC spandrels connected to the existing gutters as per the city standard (dwg#201) 400 SF 54.84$ $21,936.00 $54.84 $21,936.00 $54.84 $54.84

4.4 Adjust the NE access ramp elevation, truncated dome, curb & gutter, and asphalt slot patch according to the new cross gutter level as per SPPWC 111-5 1 LS 9,000.00$ $9,000.00 $9,000.00 $9,000.00 $9,000.00 $9,000.00

4.5 Mill and overlay 2’’ Asphalt as highlighted in the drawing. 1200 SF 14.50$ $17,400.00 $14.50 $17,400.00 $14.50 $14.50

4.6 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00

5.1 Mobilization 1 LS 5,600.00$ $5,600.00 $5,600.00 $5,600.00 $5,600.00 $5,600.00

5.2 Traffic Control 1 LS 10,500.00$ $10,500.00 $10,500.00 $10,500.00 $10,500.00 $10,500.00

5.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 17,800.00$
$17,800.00 $17,800.00 $17,800.00 $17,800.00 $17,800.00

5.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression As Per The City Modified Standard Drawing #400, and Detail A
1000 SF 280.00$
$280,000.00 $280.00 $280,000.00 $280.00 $280.00

5.5 Overlay 2’’ Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 600 SF 12.50$ $7,500.00 $12.50 $7,500.00 $12.50 $12.50

5.6 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 5,600.00$ $5,600.00 $5,600.00 $5,600.00 $5,600.00 $5,600.00

BID SCHEDULE CBID SCHEDULE DBID SCHEDULE E

6.1 Mobilization 1 LS 4,500.00$ $4,500.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00

6.2 Traffic control 1 LS 6,400.00$ $6,400.00 $6,400.00 $6,400.00 $6,400.00 $6,400.00

6.3 Prepare, implement, and maintain storm-water pollution prevention plan (SWPPP) per NPDES compliance 1 LS 3,600.00$ $3,600.00 $3,600.00 $3,600.00 $3,600.00 $3,600.00

6.4 Saw cut and remove the asphalt and all yielding and/or any unclassified soil above the storm drainpipe 1 LS 12,700.00$
$12,700.00 $12,700.00 $12,700.00 $12,700.00 $12,700.00

6.5 Remove and replace the existing damage storm drain RCP with a similar 15'' RCP. 40 LF 400.00$ $16,000.00 $400.00 $16,000.00 $400.00 $400.00

6.6 Backfill subgrade with class ii base compacted to 95% 1 LS 13,400.00$ $13,400.00 $13,400.00 $13,400.00 $13,400.00 $13,400.00

6.7 Repave the top asphalt as per the city standard drawing #310 320 SF 42.00$ $13,440.00 $42.00 $13,440.00 $42.00 $42.00

6.8 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00

7.1 Mobilization 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00

7.2 Traffic control 1 LS 5,500.00$ $5,500.00 $5,500.00 $5,500.00 $5,500.00 $5,500.00

7.3 Prepare, implement, and maintain storm-water pollution prevention plan (SWPPP) per NPDES compliance 1 LS 3,100.00$
$3,100.00 $3,100.00 $3,100.00 $3,100.00 $3,100.00

7.4 Saw cut and remove the asphalt and all yielding and/or any unclassified soil above the storm drainpipe 1 LS 7,400.00$
$7,400.00 $7,400.00 $7,400.00 $7,400.00 $7,400.00

7.5 Repair the existing damage storm drain RCP 10 LF 843.00$ $8,430.00 $843.00 $8,430.00 $843.00 $843.00

7.6 Backfill subgrade with class ii base compacted to 95% 1 LS 7,510.00$ $7,510.00 $7,510.00 $7,510.00 $7,510.00 $7,510.00

7.7 Repave the top asphalt as per the city standard drawing #310 80 SF 42.00$ $3,360.00 $42.00 $3,360.00 $42.00 $42.00

7.8 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 Apparent Low
Bidder 1
$915,551.00
$915,551.00
$0.00

BID RANKING

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT