Quantity Unit Unit Price Total Price Unit Price Total Price
1.1 Mobilization 1 LS 4,500.00$ $4,500.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00
1.2 Traffic Control 1 LS 8,500.00$ $8,500.00 $8,500.00 $8,500.00 $8,500.00 $8,500.00
1.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 14,300.00$
$14,300.00 $14,300.00 $14,300.00 $14,300.00 $14,300.00
1.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression from the NW to the SW As Per The City Modified Standard Drawing #400, and Detail A
250 SF 280.00$ $70,000.00 $280.00 $70,000.00 $280.00 $280.00
1.5 Overlay 2’’ Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 1600 SF 10.75$ $17,200.00 $10.75 $17,200.00 $10.75 $10.75
1.6 Construct Concrete Sidewalk (Panels and Curb) at the NW and SW corners with maximum slope of 2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding of a Circular Drain Lid As Per SPPWC 111-5, and Detail B
900 SF 21.25$ $19,125.00 $21.25 $19,125.00 $21.25 $21.25
1.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00
2.1 Mobilization 1 LS 5,000.00$ $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
2.2 Traffic Control 1 LS 9,500.00$ $9,500.00 $9,500.00 $9,500.00 $9,500.00 $9,500.00
2.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 17,600.00$
$17,600.00 $17,600.00 $17,600.00 $17,600.00 $17,600.00
2.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression As Per The City Modified Standard Drawing #400, and Detail A
300 SF 280.00$
$84,000.00 $280.00 $84,000.00 $280.00 $280.00
2.5 Mill and Overlay 2’’ Asphalt over the 2-parkway decking and the entire intersection as highlighted in the drawing. 1900 SF 10.00$ $19,000.00 $10.00 $19,000.00 $10.00 $10.00
2.6 Construct Concrete Sidewalk (Panels and Curb) at the 4 corners with maximum slope of
2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding a Circular Drain Lid As Per SPPWC 111-5, and Detail B
800 SF 22.00$
$17,600.00 $22.00 $17,600.00 $22.00 $22.00
2.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 4,300.00$ $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00
3.1 Mobilization 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00
BID SCHEDULE ABID SCHEDULE B
Bid Item and Description
AVERAGE BID VALUES
LOWEST UNIT BID PRICE HIGHEST UNIT BID PRICEGentry General Engineering Inc.
1. BID TABULATION
PROJECT NAME: Storm Drain at Various Locations
PROJECT NO: RFQ F-24-4019
BID TABULATION
Apparent Low Bidder 1
3.2 Traffic Control 1 LS 7,400.00$ $7,400.00 $7,400.00 $7,400.00 $7,400.00 $7,400.00
3.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 13,600.00$ $13,600.00 $13,600.00 $13,600.00 $13,600.00 $13,600.00
3.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression from the NE to the NW As Per The City Modified Standard Drawing #400, and Detail A
200 SF 280.00$
$56,000.00 $280.00 $56,000.00 $280.00 $280.00
3.5 Overlay 2’’Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 1000 SF 14.00$ $14,000.00 $14.00 $14,000.00 $14.00 $14.00
3.6 Construct Concrete Sidewalk (Panels and Curb) at the NE and NW corners with maximum slope of 2.0% and to be matched with the existing surrounding levels, without any changes in the elevation, Cast In Place Federal Yellow Truncated Dome, and Rebuilding a Circular Drain Lid As Per SPPWC 111-5, and Detail B
600 SF 24.25$ $14,550.00 $24.25 $14,550.00 $24.25 $24.25
3.7 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00
4.1 Mobilization 1 LS 3,500.00$ $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00
4.2 Traffic control 1 LS 8,000.00$ $8,000.00 $8,000.00 $8,000.00 $8,000.00 $8,000.00
4.3 Construct PCC cross gutter between the ne corner and NW corner with two PCC spandrels connected to the existing gutters as per the city standard (dwg#201) 400 SF 54.84$ $21,936.00 $54.84 $21,936.00 $54.84 $54.84
4.4 Adjust the NE access ramp elevation, truncated dome, curb & gutter, and asphalt slot patch according to the new cross gutter level as per SPPWC 111-5 1 LS 9,000.00$ $9,000.00 $9,000.00 $9,000.00 $9,000.00 $9,000.00
4.5 Mill and overlay 2’’ Asphalt as highlighted in the drawing. 1200 SF 14.50$ $17,400.00 $14.50 $17,400.00 $14.50 $14.50
4.6 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00
5.1 Mobilization 1 LS 5,600.00$ $5,600.00 $5,600.00 $5,600.00 $5,600.00 $5,600.00
5.2 Traffic Control 1 LS 10,500.00$ $10,500.00 $10,500.00 $10,500.00 $10,500.00 $10,500.00
5.3 Clearing And Grubbing, Unclassified Excavation, And Unclassified Fill, Including Cleaning The Entire Culvert Box And Removing The Parkway Culvert Deck Concrete, Asphalt, Concrete, Curb, etc... As Highlighted In The Drawings.
1 LS 17,800.00$
$17,800.00 $17,800.00 $17,800.00 $17,800.00 $17,800.00
5.4 Construct Parkway Culvert Concrete Decking including constructing the inlet and the outlet openings with modified depression As Per The City Modified Standard Drawing #400, and Detail A
1000 SF 280.00$
$280,000.00 $280.00 $280,000.00 $280.00 $280.00
5.5 Overlay 2’’ Asphalt over the parkway decking and 6 Feet around the corners as highlighted in Detail B 600 SF 12.50$ $7,500.00 $12.50 $7,500.00 $12.50 $12.50
5.6 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 5,600.00$ $5,600.00 $5,600.00 $5,600.00 $5,600.00 $5,600.00
BID SCHEDULE CBID SCHEDULE DBID SCHEDULE E
6.1 Mobilization 1 LS 4,500.00$ $4,500.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00
6.2 Traffic control 1 LS 6,400.00$ $6,400.00 $6,400.00 $6,400.00 $6,400.00 $6,400.00
6.3 Prepare, implement, and maintain storm-water pollution prevention plan (SWPPP) per NPDES compliance 1 LS 3,600.00$ $3,600.00 $3,600.00 $3,600.00 $3,600.00 $3,600.00
6.4 Saw cut and remove the asphalt and all yielding and/or any unclassified soil above the storm drainpipe 1 LS 12,700.00$
$12,700.00 $12,700.00 $12,700.00 $12,700.00 $12,700.00
6.5 Remove and replace the existing damage storm drain RCP with a similar 15'' RCP. 40 LF 400.00$ $16,000.00 $400.00 $16,000.00 $400.00 $400.00
6.6 Backfill subgrade with class ii base compacted to 95% 1 LS 13,400.00$ $13,400.00 $13,400.00 $13,400.00 $13,400.00 $13,400.00
6.7 Repave the top asphalt as per the city standard drawing #310 320 SF 42.00$ $13,440.00 $42.00 $13,440.00 $42.00 $42.00
6.8 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00
7.1 Mobilization 1 LS 4,000.00$ $4,000.00 $4,000.00 $4,000.00 $4,000.00 $4,000.00
7.2 Traffic control 1 LS 5,500.00$ $5,500.00 $5,500.00 $5,500.00 $5,500.00 $5,500.00
7.3 Prepare, implement, and maintain storm-water pollution prevention plan (SWPPP) per NPDES compliance 1 LS 3,100.00$
$3,100.00 $3,100.00 $3,100.00 $3,100.00 $3,100.00
7.4 Saw cut and remove the asphalt and all yielding and/or any unclassified soil above the storm drainpipe 1 LS 7,400.00$
$7,400.00 $7,400.00 $7,400.00 $7,400.00 $7,400.00
7.5 Repair the existing damage storm drain RCP 10 LF 843.00$ $8,430.00 $843.00 $8,430.00 $843.00 $843.00
7.6 Backfill subgrade with class ii base compacted to 95% 1 LS 7,510.00$ $7,510.00 $7,510.00 $7,510.00 $7,510.00 $7,510.00
7.7 Repave the top asphalt as per the city standard drawing #310 80 SF 42.00$ $3,360.00 $42.00 $3,360.00 $42.00 $42.00
7.8 Pavement Markers, Marking, Legend, Striping, Signage & Stop Bar. 1 LS 3,800.00$ $3,800.00 $3,800.00 $3,800.00 $3,800.00 $3,800.00 Apparent Low
Bidder 1
$915,551.00
$915,551.00
$0.00
BID RANKING
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES
TOTAL BID AMOUNT INDICATED BY BIDDER
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT
BID SCHEDULE G BID SCHEDULE F