Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization 1 LS 8,750.00$ $8,750.00 20,811.60 $ $20,811.60 $20,000.00 70,000.00 $ $70,000.00 2 Remove existing dugout chain link fences and doors. 160 LF 20.00$ $3,200.00 24.60 $ $3,936.00 $5,000.00 30.00 $ $4,800.00 3 Remove benches inside Dugouts. 4E A 800.00$ $3,200.00 3,075.00 $ $12,300.00 $2,000.00 900.00 $ $3,600.00 4 Remove concrete ramp & curb flare. 1 LS 5,800.00$ $5,800.00 1,845.00 $ $1,845.00 $6,000.00 1,600.00 $ $1,600.00 5 Remove and dispose existing Bleachers 4 EA 3,300.00$ $13,200.00 3,690.00 $ $14,760.00 $12,000.00 1,200.00 $ $4,800.00 6 Laser leveling & material (clay) for infield, pitching mound and bases (No Turf area) 2E A 6,200.00$ $12,400.00 9,102.00 $ $18,204.00 $38,000.00 24,000.00 $ $48,000.00 7 Increase height of fence at Backstop, to be a total of 20 feet (west playfield) 50 LF 350.00$ $17,500.00 182.04 $ $9,102.00 $18,000.00 300.00 $ $15,000.00 8 Furnish and install dugout fence (8' high), gate, and bat rack 4E A 3,500.00$ $14,000.00 5,904.00 $ $23,616.00 $7,000.00 11,500.00 $ $46,000.00 9 Furnish and install team benches 15' long (inground) inside the dugouts 4E A 2,500.00$ $10,000.00 5,510.40 $ $22,041.60 $84,000.00 9,500.00 $ $38,000.00 10 Furnish and install bleachers “Anthem Sports” or approved equal, with aisle & risers, 5 rows, 21' wide 4E A 13,500.00$ $54,000.00 16,236.00 $ $64,944.00 $12,000.00 26,000.00 $ $104,000.00 11 Furnish and install curbs or parking bumpers 2 EA 900.00$ $1,800.00 425.58 $ $851.16 $12,000.00 500.00 $ $1,000.00 12 Mark disabled parking stall symbols on pavement, and striping 2 EA 3,250.00$ $6,500.00 1,691.25 $ $3,382.50 $9,000.00 3,500.00 $ $7,000.00 13 Furnish and install disabled parking stall signs 2 EA 4,934.00$ $9,868.00 1,107.00 $ $2,214.00 $1,500.00 1,200.00 $ $2,400.00 14 Handicap path of travel, and access aisle striping 1L S 3,000.00$ $3,000.00 3,911.65 $ $3,911.65 $2,500.00 6,500.00 $ $6,500.00 15 Construct ADA Concrete Ramp. Use concrete class 560-C-3250 1 EA 8,800.00$ $8,800.00 4,305.00 $ $4,305.00 $12,000.00 12,000.00 $ $12,000.00 16 Construction 4’ x 8’ project sign 1 EA 1,200.00$ $1,200.00 1,451.40 $ $1,451.40 $2,644.00 1,600.00 $ $1,600.00 17 Furnish paint, and paint existing fence posts that are rusty with silver color exterior enamel paint that also stops rust. 1L S 25,670.00$ $25,670.00 2,755.20 $ $2,755.20 $800.00 31,000.00 $ $31,000.00 Apparent Low Bidder 1 Apparent Low Bidder 2 Apparent Low Bidder 3 Apparent Low Bidder 4 $198,888.00 $210,431.11 $244,444.00 $397,300.00
$198,888.00 $210,431.11 $244,444.00 $397,300.00
A1
-$ - $ - $ - $ $0.00 $0.00 $0.00 $0.00
$198,888.00 $210,431.11 $244,444.00 $397,300.00
TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT
ADDITIVE ALTERNATE #1
ADDITIVE ALTERNATE # TOTAL
BASE BID + ADDITIVE ALTERNATVE TOTAL
Apparent Low Bidder 3
Shiraz Construction
1. BID TABULATION
PROJECT NAME: IMPROVEMENTS AR ENCANTO PARK
PROJECT NO: PR 25-008
Bid Item and Description
Apparent Low Bidder 1
Global Builders Inc.
Apparent Low Bidder 2
Zeco Inc. CSI Services
Apparent Low Bidder 4
BID RANKING
TOTAL BID AMOUNT INDICATED BY BIDDER
BID TABULATION
S:\ENGINEERING\RFCA's\2025 All\1.15.2025\Award Encanto\Updated - Encanto Bid AnalysisBID TABULATION 1 of 1