Cities Index.
Agenda packet

Mayor and City Council
June 3, 2026

Document
Agenda packet
Meeting
June 3, 2026
Body
Mayor and City Council
Pages
41
Original file
223.0 MB
Text extracted from the city's file for reading and search. Open the original on sanbernardino.primegov.com. That file is the official record.

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Approval of Agreement with National Auto Fleet Group for the Purchase of One Freightliner Asphalt Patch Truck in an amount Not to Exceed $449,740.78, Utilizing
Sourcewell Contract No. 032824-NAF (All Wards)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California adopt Resolution 2026-064:

1. Approving a Cooperative Goods Purchase Agreement with National Auto Fleet Group for the purchase of one (1) 2027 Freightliner 114SD chassis equipped with a Bergkamp Electric Heating Pothole Patcher Body in the amount of $428,324.55, utilizing Sourcewell Contract No. 032824-NAF; and

2. Approving a contingency in the amount of $21,416.23 (5%), for a total authorized amount not to exceed $449,740.78, to accommodate potential increases in material, freight, and other supplier-driven costs, and authorize the City Manager or designee to execute amendments to the Cooperative Goods Purchase Agreement, if necessary, provided that the total contract amount does not exceed the authorized amount; and

3. Authorizing the City Manager or designee to execute the Cooperative Goods Purchase Agreement, any amendments thereto, and all related documents necessary to effectuate the purchase; and

4. Authorizing the Director of Finance and Management Services to issue a purchase order in an amount not to exceed $449,740.78, provided sufficient appropiations are available in the adopted budget and eligible funding sources.

Executive Summary
Packet Page. 1545
The purchase of a 2027 Freightliner 114SD truck with a Bergkamp electric heating pothole patcher body will allow the Public Works Department to heat, transport, and apply asphalt for pothole patching and roadway repairs. The City currently operates a 2019 Ford F-750 patch truck that has experienced recurring mechanical issues, downtime, and repair costs, including more than $35,000 in repair costs over the past year. The proposed replacement will improve the reliability of roadway maintenance operations and support faster response to pavement repair needs. The vehicle will be purchased from National Auto Fleet Group using Sourcewell Contract No. 032824- NAF. The total purchase price is $428,324.55, with a recommended 5% contingency of $21,416.23, for a total not-to-exceed amount of $449,740.78. Funding will come from AQMD AB2766 Subvention Funds and RMRA/SB 1 funds.

Background
The Public Works Department’s Operations and Maintenance Division is responsible for maintaining the City’s roadway network, including pothole repair, asphalt patching, and emergency pavement maintenance. Asphalt patch trucks are essential equipment used to repair roadway failures, restore damaged pavement, and maintain safe travel conditions for motorists, cyclists, and pedestrians.

The City currently operates a 2019 Ford F-750 patch truck, which has experienced persistent mechanical issues since shortly after delivery. The most significant problems involve the Power Take-Off (PTO) system, which transfers power from the truck’s engine to operate the tack emulsion system used during asphalt repairs. When functioning properly, the system heats and sprays tack oil to ensure proper bonding between new asphalt and the existing pavement surface. However, recurring failures with the heating system and related components have caused the tack emulsion to cool and harden, preventing the truck from operating as intended and resulting in repeated downtime and repairs. These failures have resulted in recurring downtime and costly repairs. Records show that similar PTO-related issues have been documented since 2020, indicating that the unit has experienced reliability concerns for several years.

Over the past year alone, repair costs for the patch truck have exceeded $35,000, and the vehicle is currently awaiting additional repair evaluation. Continued mechanical failures have reduced the reliability of the City’s pavement repair operations and limited the ability of crews to respond efficiently to roadway maintenance needs.

Replacing the aging patch truck with a modern unit will improve pavement repair reliability, reduce equipment downtime, and lower long-term maintenance costs.

Discussion
The proposed vehicle is a 2027 Freightliner 114SD chassis equipped with a Bergkamp electric heating pothole patcher body, which provides the capability to heat and apply asphalt material directly at the repair location for pothole and pavement repairs. This equipment will allow crews to perform repairs more efficiently, improve response times, and enhance the durability of pavement maintenance work throughout the City.

Packet Page. 1546
National Auto Fleet Group, an authorized Sourcewell vendor, provided a quote for the specified vehicle configuration required by the City. The total quoted purchase price is $428,324.55, which includes the vehicle chassis, patcher body, applicable sales tax and required tire fees.

This purchase will be made through Sourcewell Contract No. 032824-NAF, a competitively solicited purchasing agreement for Class 4-8 chassis and related equipment. The City’s Purchasing Policy allows the use of cooperative purchasing agreements when the agreement was competitively procured, and use of the agreement is in the City’s best interest.

Sourcewell shows Contract 032824-NAF with National Auto Fleet Group for Class 4-8 and related equipment, maturing July 9, 2028.

Staff recommends a 5% contingency in the amount of $21,416.23 to address verified supplier-driven changes in material, labor, freight, or other delivery-related costs before final invoice or delivery. Use of the contingency shall require written vendor documentation, confirmation of eligible funding, and shall not increase the total authorized amount above $449,740.78.

To address these operational challenges, the Public Works Department is proposing the purchase of a new asphalt patch truck that utilizes newer, cleaner engine technology that meets current California Air Resources Board (CARB) emissions standards. T The proposed truck will meet current California Air Resources Board emissions standards and is expected to reduce emissions compared with older dieselpowered equipment.

Because the replacement vehicle incorporates cleaner fuel technology and supports emission reduction goals, the purchase qualifies for funding through the AB2766 Air Quality Program. AB2766 funds are allocated to local jurisdictions to support projects that reduce air pollution from motor vehicles and improve regional air quality. Utilizing this funding allows the City to replace aging equipment with cleaner, more efficient technology without relying on General Fund resources
2021-2025 Strategic Targets and Goals
This item supports the City of San Bernardino’s 2021–2025 Strategic Plan goal of Improved Quality of Life by enhancing the City’s ability to maintain streets and repair potholes in a timely and efficient manner. Approval of this purchase will allow the Public Works Department to improve roadway maintenance operations and respond more effectively to pothole repair needs across the City, resulting in safer roadways, improved driving conditions, and a better overall experience for residents, businesses, and visitors.

Fiscal Impact
Funding for the purchase of the asphalt patch truck will be provided from a combination Packet Page. 1547
of local and State funding sources. A total of $338,260.00 will be funded using available South Coast Air Quality Management District (AQMD) AB 2766 Subvention Funds, which are restricted for projects and equipment that reduce vehicle emissions and improve air quality.

The remaining balance of $111,480.78 will be funded using Road Maintenance and Rehabilitation Account (RMRA) funds established pursuant to Senate Bill 1 (SB 1).

RMRA funds are designated for eligible street maintenance and rehabilitation activities and may be used for the purchase of equipment directly related to roadway repair operations, including asphalt patch trucks.

The total funding available for this purchase is summarized below:

Funding Source Amount
AQMD AB 2766 Subvention Funds $338,260.00
SB 1 RMRA Funds $111,480.78
Total Funding $449,740.78
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California adopt Resolution 2026-064:

1. Approving a Cooperative Goods Purchase Agreement with National Auto Fleet Group for the purchase of one (1) 2027 Freightliner 114SD chassis equipped with a Bergkamp Electric Heating Pothole Patcher Body in the amount of $428,324.55, utilizing Sourcewell Contract No. 032824-NAF; and

2. Approving a contingency in the amount of $21,416.23 (5%), for a total authorized amount not to exceed $449,740.78, to accommodate potential increases in material, freight, and other supplier-driven costs, and authorize the City Manager or designee to execute amendments to the Cooperative Goods Purchase Agreement, if necessary, provided that the total contract amount does not exceed the authorized amount; and

3. Authorizing the City Manager or designee to execute the Cooperative Goods Purchase Agreement, any amendments thereto, and all related documents necessary to effectuate the purchase; and

4. Authorizing the Director of Finance and Management Services to issue a purchase order in an amount not to exceed $449,740.78, provided sufficient appropriations are available in the adopted budget and eligible funding sources.

Attachments
Attachment 1 - Resolution No. 2026-064
Attachment 2 - Goods Purchasing Agreement – National Auto Fleet Attachment 3 - National Auto Fleet Sourcewell Contract
Packet Page. 1548
Ward:

All Wards
Synopsis of Previous Council Actions:

N/A
CC: Eric Levitt, City Manager
Packet Page. 1549
Resolution No. 2026-064
Resolution No. 2026-064
June 3, 2026

Page 1 of 4 ends

RESOLUTION NO.2026-064

RESOLUTION OF THE MAYOR AND CITY COUNCIL OF

THE CITY OF SAN BERNARDINO APPROVING A

COOPERATIVE GOODS PURCHASE AGREEMENT WITH

NATIONAL AUTO FLEET GROUP FOR THE PURCHASE
OF ONE (1) 2027 FREIGHTLINER 114SD EQUIPPED WITH

A BERGKAMP ELECTRIC HEATING POTHOLE
PATCHER BODY IN THE AMOUNT OF $428,324.55,
UTILIZING SOURCEWELL CONTRACT NO. 032824-NAF;

APPROVING A CONTINGENCY IN THE AMOUNT OF
$21,416.23, FOR A TOTAL AUTHORIZED AMOUNT NOT
TO EXCEED $449,740.78; AUTHORIZING THE CITY

MANAGER OR DESIGNEE TO EXECUTE THE

AGREEMENT, ANY AMENDMENTS THERETO, AND ALL

RELATED DOCUMENTS NECESSARY TO EFFECTUATE
THE PURCHASE; AND AUTHORIZING THE DIRECTOR

OF FINANCE AND MANAGEMENT SERVICES TO
AMEND THE FISCAL YEAR 2026/27 BUDGET, IF

NECESSARY, AND ISSUE A PURCHASE ORDER IN AN
AMOUNT NOT TO EXCEED $449,740.78
WHEREAS, the Public Works Department Operations and Maintenance division is responsible for maintaining and repairing the City’s roadway network; and WHEREAS, timely pothole repair and pavement maintenance are essential to preserving roadway conditions and ensuring safe travel for residents, businesses, and visitors; and WHEREAS, the purchase of one (1) 2027 Freightliner 114SD chassis equipped with a Bergkamp Electric Heating Pothole Patcher Body will improve the City’s ability to perform efficient and cost-effective pothole repairs and roadway maintenance; and WHEREAS, the proposed purchase price is $428,324.55, and staff recommends a contingency of $21,416.23 (5%) to address potential increases in labor, material, freight, and other supplier-driven costs, for a total authorized amount not to exceed $449,740.78; and WHEREAS, the vehicle was competitively procured through National Auto Fleet Group utilizing Sourcewell Contract No. 032824-NAF in accordance with the City’s purchasing requirements; and
WHEREAS, funding for the purchase is available from South Coast Air Quality Management District AB 2766 Subvention Funds in the amount of $338,260.00 and State Road Maintenance and Rehabilitation Account funds in the amount of $111,480.78; and Packet Page. 1550
Resolution No. 2026-064
Resolution No. 2026-064
June 3, 2026

Page 2 of 4 ends

WHEREAS, no General Fund dollars are required for this purchase.

BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS:

SECTION 1. The above recitals are true and correct and are incorporated herein by this reference.

SECTION 2. The Mayor and City Council hereby approve a Cooperative Goods Purchase Agreement with National Auto Fleet Group for the purchase of one (1) 2027 Freightliner 114SD chassis equipped with a Bergkamp Electric Heating Pothole Patcher Body in the amount of $428,324.55, utilizing Sourcewell Contract No. 032824-NAF.

SECTION 3. The Mayor and City Council hereby approve a contingency in the amount of $21,416.23, for a total authorized amount not to exceed $449,740.78, and authorize the City Manager or designee to execute amendments to the Cooperative Goods Purchase Agreement as necessary, provided the total amount does not exceed the authorized amount.

SECTION 4. The Mayor and City Council hereby authorize the City Manager or designee to execute the Cooperative Goods Purchase Agreement, any amendments thereto, and all related documents necessary to effectuate the purchase.

SECTION 5. The Mayor and City Council hereby authorize the Director of Finance and Management Services to amend the Fiscal Year 2025/2026 and/or 2026/27 budget, if necessary, and issue a purchase order in an amount not to exceed $449,740.78, using available South Coast Air Quality Management District AB 2766 Subvention Funds and State Road Maintenance and Rehabilitation Account funds.

SECTION 6. CEQA. The Mayor and City Council finds this Resolution is not subject to the California Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty, as in this case, that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

SECTION 7. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held to be invalid, such invalidity shall not affect other provisions or applications of the Resolution that can be given effect without the invalid provision or application.

SECTION 8. Effective Date. This Resolution shall become effective immediately upon adoption.

Packet Page. 1551
Resolution No. 2026-064
Resolution No. 2026-064
June 3, 2026

Page 3 of 4 ends

APPROVED and ADOPTED by the City Council and signed by the Mayor and attested by the City Clerk this 3
rd day of June 2026.

Helen Tran, Mayor
City of San Bernardino
Attest:

Telicia Lopez, CMC, City Clerk
Approved as to form:

Sonia Carvalho, City Attorney
Packet Page. 1552
Resolution No. 2026-064
Resolution No. 2026-064
June 3, 2026

Page 4 of 4 ends

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss

CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of Resolution No. 2026-064 adopted at a regular meeting held on the 3 rd day of June 2026 by the
following vote:

Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this ___ day of June 2026.

Telicia Lopez, CMC, City Clerk
Packet Page. 1553
1 CITY OF SAN BERNARDINO

GOODS PURCHASE AGREEMENT
This Goods Purchase Agreement (“Agreement”) is entered into this 3rd day of June, 2026, by and between the City of San Bernardino, a charter city and municipal corporation organized under the laws of the State of California with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, County of San Bernardino, State of California (“City”), and 72 HOUR LLC, dba NATIONAL AUTO FLEET GROUP, a LIMITED LIABILITY COMPANY with its principal place of business at 490 AUTO CENTER DRIVE, WATSONVILLE, CA 95076 (“Supplier”). City and Supplier are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

Section 1. DEFINITIONS.

A. “Goods” means all machinery, equipment, supplies, items, parts, materials, labor or other services, including design, engineering and installation services, provided by Supplier as specified in Exhibit “A,” attached hereto and incorporated herein by reference.

B. “Delivery Date(s)” means that date or dates upon which the Goods is to be delivered to City, ready for approval, testing and/or use as specified in Exhibit “B.” Section 2. MATERIALS AND WORKMANSHIP.

When Exhibit “A” specifies machinery, equipment or material by manufacturer, model or trade name, no substitution will be made without City’s written approval.

Machinery, equipment or material installed in the Goods without the approval required by this Section 2 will be deemed to be defective material for purposes of Section 4. Where machinery, equipment or materials are referred to in Exhibit “A” as equal to any particular standard, City will decide the question of equality. When requested by City, Supplier will furnish City with the name of the manufacturer, the performance capabilities and other pertinent information necessary to properly determine the quality and suitability of any machines, equipment and material to be incorporated in the Goods. Material samples will be submitted at City’s request.

Section 3. INSPECTIONS AND TESTS.

City shall have the right to inspect and/or test the Goods prior to acceptance. If upon inspection or testing the Goods or any portion thereof are found to be nonconforming, unsatisfactory, defective, of inferior quality or workmanship, or fail to meet any requirements or specifications contained in Exhibit “A,” then without prejudice to any other rights or remedies, City may reject the Goods or exercise any of its rights under Section 4.C. The inspection, failure to make inspection, acceptance of goods, or payment for goods shall not impair City’s right to reject nonconforming goods, irrespective of City’s failure to notify Supplier of a rejection of nonconforming goods or revocation of Packet Page. 1554
2 acceptance thereof or to specify with particularity any defect in nonconforming goods after rejection or acceptance thereof.

Section 4. WARRANTY.

A. Supplier warrants that the Goods will be of merchantable quality and free from defects in design, engineering, material, and workmanship for a period of two (2) years, or such longer period as provided by a manufacturer’s warranty or as agreed to by Supplier and City, from the date of final written acceptance of the Goods by City as required for final payment under Section 7. Supplier further warrants that any services provided in connection with the Goods will be performed in a professional and workmanlike manner and in accordance with the highest industry standards.

B. Supplier further warrants that all machinery, equipment, or process included in the Goods will meet the performance requirements and specifications specified in Exhibit “A” and shall be fit for the purpose intended. City’s inspection, testing, approval, or acceptance of any such machinery, equipment, or process will not relieve Supplier of its obligations under this Section 4.B.

C. For any breach of the warranties contained in Section 4.A and Section 4.B, Supplier will, immediately after receiving notice from City, at the option of City, and at Supplier’s own expense and without cost to City:

1. Repair the defective Goods;

2. Replace the defective Goods with conforming Goods, F.O.B. City’s plant, office or other location of City where the Goods was originally performed or delivered; or

3. Repay to City the purchase price of the defective Goods.

If City selects repair or replacement, any defects will be remedied without cost to City, including but not limited to, the costs of removal, repair, delivery, and replacement of the defective Goods, and reinstallation of new Goods. All such defective Goods that are so remedied will be similarly warranted as stated above. In addition, Supplier will repair or replace other items of the Goods which may have been damaged by such defects or the repairing of the same, all at its own expense and without cost to City.

D. Supplier also warrants that the Goods are free and clear of all liens and encumbrances whatsoever, that Supplier has a good and marketable title to same, and that Supplier owns or has a valid license for all of the proprietary technology and intellectual property incorporated within the Goods. Supplier agrees to indemnify, defend, and hold City harmless against any and all third party claims resulting from the breach or inaccuracy of any of the foregoing warranties.

E. In the event of a breach by Supplier of its obligations under this Section 4, City will not be limited to the remedies set forth in this Section 4, but will have all the rights Packet Page. 1555
3 and remedies permitted by applicable law, including without limitation, all of the rights and remedies afforded to City under the California Commercial Code.

Section 5. PRICES.

Unless expressly provided otherwise, all prices and fees specified in Exhibit “C,” attached hereto and incorporated herein by reference, are firm and shall not be subject to change without the written approval of City. No extra charges of any kind will be allowed unless specifically agreed to in writing by City’s authorized representative. The total price shall include (i) all federal, state and local sales, use, excise, privilege, payroll, occupational and other taxes applicable to the Goods furnished to City hereunder; and (ii) all charges for packing, freight and transportation to destination.

Section 6. CHANGES.

City, at any time, by a written order, and without notice to any surety, may make changes in the Goods, including but not limited to, City’s requirements and specifications.

If such changes affect the cost of the Goods or time required for its performance, an equitable adjustment will be made in the price or time for performance or both. Any change in the price necessitated by such change will be agreed upon between City and Supplier and such change will be authorized by a change order document signed by City and accepted by Supplier.

Section 7. PAYMENTS.

A. Terms of payment, are net thirty (30) days, less any applicable retention, after receipt of invoice, or completion of applicable Progress Milestones. Final payment shall be made by City after Supplier has satisfied all contractual requirements. Payment of invoices shall not constitute acceptance of Goods.

B. If Progress Milestones have been specified in Exhibit “B,” then payments for the Goods will be made as the requirements of such Progress Milestones are met.

Progress payments for the Goods will be made by City upon proper application by Supplier during the progress of the Goods and according to the terms of payment as specified in Exhibit “B.” Supplier’s progress billing invoice will include progress payments due for the original scope of work and changes. Each “Item for Payment” shown in Exhibit “B” and each change order will be itemized on the invoice. Invoices for cost plus work, whether part of Exhibit “B” or a change order, must have subcontractor and/or supplier invoices attached to Supplier’s invoice. Other format and support documents for invoices will be determined by City in advance of the first invoice cycle.

C. Payments otherwise due may be withheld by City on account of defective Goods not remedied, liens or other claims filed, reasonable evidence indicating probable filing of liens or other claims, failure of Supplier to make payments properly to its subcontractors or for material or labor, the failure of Supplier to perform any of its other obligations under the Agreement, or to protect City against any liability arising out of Supplier’s failure to pay or discharge taxes or other obligations. If the causes for which Packet Page. 1556
4 payment is withheld are removed, the withheld payments will be made promptly. If the said causes are not removed within a reasonable period after written notice, City may remove them at Supplier’s expense.

D. Payment of the final Progress Milestone payment or any retention will be made by City upon:

1. Submission of an invoice for satisfactory completion of the requirements of a Progress Milestone as defined in Exhibit “B” and in the amount associated with the Progress Milestone;

2. Written acceptance of the Goods by City;

3. Delivery of all drawings and specifications, if required by City;

4. Delivery of executed full releases of any and all liens arising out of this Agreement; and

5. Delivery of an affidavit listing all persons who might otherwise be entitled to file, claim, or maintain a lien of any kind or character, and containing an averment that all of the said persons have been paid in full.

If any person refuses to furnish an actual release or receipt in full, Supplier may furnish a bond satisfactory to City to indemnify City against any claim or lien at no cost to City.

E. Acceptance by Supplier of payment of the final Progress Milestone payment pursuant to Section 7.D will constitute a waiver, release and discharge of any and all claims and demands of any kind or character which Supplier then has, or can subsequently acquire against City, its successors and assigns, for or on account of any matter or thing arising out of, or in any manner connected with, the performance of this Agreement. However, payment for the final Progress Milestone by City will not constitute a waiver, release or discharge of any claims or demands which City then has, or can subsequently acquire, against Supplier, its successors and assigns, for or on account of any matter or thing arising out of, or in any manner connected with, the performance of this Agreement.

Section 8. SCHEDULE FOR DELIVERY.

A. The time of Supplier’s performance is of the essence for this Agreement.

The Goods will be delivered in accordance with the schedule set forth in Exhibit “B.” Supplier must immediately notify City in writing any time delivery is behind schedule or may not be completed on schedule. In addition to any other rights City may have under this Agreement or at law, Supplier shall pay City the sum of $1 per item of Goods for each calendar day for which the item of Goods is unavailable beyond the scheduled delivery date(s) specified in Exhibit “B.”
Packet Page. 1557
5 B. In the event that the Goods are part of a larger project or projects that require the coordination of multiple contractors or suppliers, then Supplier will fully cooperate in scheduling the delivery so that City can maximize the efficient completion of such project(s).

Section 9. TAXES.

A. Supplier agrees to timely pay all sales and use tax (including any value added or gross receipts tax imposed similar to a sales and use tax) imposed by any federal, state or local taxing authority on the ultimate purchase price of the Goods provided under this Agreement.

B. Supplier will withhold, and require its subcontractors, where applicable, to withhold all required taxes and contributions of any federal, state or local taxing authority which is measured by wages, salaries or other remuneration of its employees or the employees of its subcontractors. Supplier will deposit, or cause to be deposited, in a timely manner with the appropriate taxing authorities all amounts required to be withheld.

C. All other taxes, however denominated or measured, imposed upon the price of the Goods provided hereunder, will be the responsibility of Supplier. In addition, all taxes assessed by any taxing jurisdiction based on Supplier property used or consumed in the provision of the Goods, such as and including ad valorem, use, personal property and inventory taxes, will be the responsibility of Supplier.

D. Supplier will, upon written request, submit to City written evidence of any filings or payments of all taxes required to be paid by Supplier hereunder.

Section 10. INDEPENDENT CONTRACTOR.

Supplier enters into this Agreement as an independent contractor and not as an employee of City. Supplier shall have no power or authority by this Agreement to bind City in any respect. Nothing in this Agreement shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Supplier are employees, agents, contractors or subcontractors of the Supplier and not of City. City shall not be obligated in any way to pay any wage claims or other claims made against Supplier by any such employees, agents, contractors or subcontractors or any other person resulting from performance of this Agreement.

Section 11. SUBCONTRACTS.

Unless otherwise specified, Supplier must obtain City’s written permission before subcontracting any portion of the Goods. Except for the insurance requirements in Section 13.A, all subcontracts and orders for the purchase or rental of supplies, materials or equipment, or any other part of the Goods, will require that the subcontractor be bound by and subject to all of the terms and conditions of the Agreement. No subcontract or order will relieve Supplier from its obligations to City, including, but not limited to Supplier’s insurance and indemnification obligations. No subcontract or order will bind City.

Packet Page. 1558
6 Section 12. TITLE AND RISK OF LOSS.

Unless otherwise agreed, City will have title to, and risk of loss of, all completed and partially completed portions of the Goods upon delivery, as well as materials delivered to and stored on City property which are intended to become a part of the Goods. However, Supplier will be liable for any loss or damage to the Goods and/or the materials caused by Supplier or its subcontractors, their agents or employees, and Supplier will replace or repair said Goods or materials at its own cost to the complete satisfaction of City. Notwithstanding the foregoing, in the event that the City has paid Supplier for all or a portion of the Goods which remains in the possession of Supplier, then City shall have title to, and the right to take possession of, such Goods at any time following payment therefor. Risk of loss for any Goods which remains in the possession of Supplier shall remain with Supplier until such Goods has been delivered or City has taken possession thereof. Supplier will have risk of loss or damage to Supplier’s property used in the construction of the Goods but which does not become a part of the Goods.

Section 13. INDEMNIFICATION.

A. Supplier shall defend, indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions, negligence or willful misconduct of Supplier, its officials, officers, employees, agents, subcontractors and subconsultants arising out of or in connection with the Goods or the performance of this Agreement, including without limitation the payment of all consequential damages and attorneys’ fees and other related costs and expenses except such loss or damage which was caused by the sole negligence or willful misconduct of the City.

B. Supplier’s defense obligation for any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, its officials, officers, employees, agents, or volunteers shall be at Supplier’s own cost, expense, and risk. Supplier shall pay and satisfy any judgment, award, or decree that may be rendered against City or its officials, officers, employees, agents, or volunteers, in any such suit, action, or other legal proceeding. Supplier shall reimburse City and its officials, officers, employees, agents, and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided.

C. Supplier’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its officials, officers, employees, agents or volunteers.

Section 14. INSURANCE.

A. General. Supplier shall take out and maintain:

Packet Page. 1559
7 1. Commercial General Liability Insurance, of at least two million dollars ($2,000,000 per occurrence) and the general aggregate not less than four million dollars ($4,000,000) for bodily injury, personal injury and property damage, at least as broad as Insurance Services Office Commercial General Liability most recent Occurrence Form CG 00 01;

2. Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, of at least one million dollars ($1,000,000) per accident for bodily injury and property damage, at least as broad as most recent Insurance Services Office Form Number CA 00 01 covering automobile liability, Code 1 (any auto);

3. Workers’ Compensation in compliance with applicable statutory requirements and Employer's Liability Coverage of at least $1,000,000 per occurrence; and

4. Pollution Liability Insurance of at least one million dollars ($1,000,000) per occurrence and $2,000,000 aggregate shall be provided by the Supplier if transporting hazardous materials.

5. If Supplier is also the manufacturer of any equipment included in the Goods, Supplier shall carry Product Liability and/or Errors and Omissions Insurance which covers said equipment with limits of not less than one million dollars ($1,000,000).

6. Privacy/Network Security (Cyber Liability), of at least one million dollars ($1,000,000) per occurrence and aggregate for: (1) privacy breaches, (2) system breaches, (3) denial or loss of service, and (4) the introduction, implantation or spread of malicious software code, in a form and with insurance companies acceptable to the City.

B. Additional Insured; Primary; Waiver of Subrogation; No Limitation on Coverage. The policies required under this Section shall give City, its officials, officers, employees, agents or volunteers additional insured status. Such policies shall contain a provision stating that Supplier’s policy is primary insurance and that any insurance, selfinsurance or other coverage maintained by the City or any additional insureds shall not be called upon to contribute to any loss, and shall contain or be endorsed with a waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.

Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as additional insured pursuant to this Agreement.

Packet Page. 1560
8 C. Insurance Carrier. All insurance required under this Section is to be placed with insurers with a current A.M. Best’s rating no less than A :VIII, licensed to do business in California, and satisfactory to the City.

D. Evidence of Insurance. Supplier shall furnish City with original certificates of insurance and endorsements effecting coverage required by the Agreement. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before delivery commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

E. Subcontractors. All subcontractors shall meet the requirements of this Section before commencing work. In addition, Supplier shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.

F. Freight. Supplier shall ensure that third party shippers contracted by Supplier have adequate insurance coverage for the shipped Goods.

Section 15. LIENS.

A. Supplier, subcontractors and suppliers will not make, file or maintain a mechanic’s or other lien or claim of any kind or character against the Goods, for or on account of any labor, materials, fixtures, tools, machinery, equipment, or any other things furnished, or any other work done or performance given under, arising out of, or in any manner connected with the Agreement (such liens or claims referred to as “Claims”); and Supplier, subcontractor and suppliers expressly waive and relinquish any and all rights which they now have, or may subsequently acquire, to file or maintain any Claim and Supplier, subcontractor and suppliers agree that this provision waiving the right of Claims will be an independent covenant.

B. Supplier will save and hold City harmless from and against any and all Claims that may be filed by a subcontractor, supplier or any other person or entity and Supplier will, at its own expense, defend any and all actions based upon such Claims and will pay all charges of attorneys and all costs and other expenses arising from such Claims.

Section 16. TERMINATION OF AGREEMENT BY CITY.

A. Should Supplier at any time refuse or fail to deliver the Goods with promptness and diligence, or to perform any of its other obligations under the Agreement, City may terminate Supplier’s right to proceed with the delivery of the Goods by written notice to Supplier. In such event City may obtain the Goods by whatever method it may deem expedient, including the hiring of another contractor or other contractors and, for that purpose, may take possession of all materials, machinery, equipment, tools and Packet Page. 1561
9 appliances and exercise all rights, options and privileges of Supplier. In such case Supplier will not be entitled to receive any further payments until the Goods are delivered.

If City’s cost of obtaining the Goods, including compensation for additional managerial and administrative services, will exceed the unpaid balance of the Agreement, Supplier will be liable for and will pay the difference to City.

B. City may, for its own convenience, terminate Supplier’s right to proceed with the delivery of any portion or all of the Goods by written notice to Supplier. Such termination will be effective in the manner specified in such notice, will be without prejudice to any claims which City may have against Supplier, and will not affect the obligations and duties of Supplier under the Agreement with respect to portions of the Goods not terminated.

C. On receipt of notice under Section 16.B, Supplier will, with respect to the portion of the Goods terminated, unless the notice states otherwise,

1. Immediately discontinue such portion of the Goods and the placing of orders for materials, facilities, and supplies in connection with the Goods,

2. Unless otherwise directed by City, make every reasonable effort to procure cancellation of all existing orders or contracts upon terms satisfactory to City; and

3. Deliver only such portions of the Goods which City deems necessary to preserve and protect those portions of the Goods already in progress and to protect material, plant, and equipment at the Goods site or in transit to the Goods site.

D. Upon termination pursuant to Section 16.B, Supplier will be paid a pro rata portion of the compensation in the Agreement for any portion of the terminated Goods already delivered, including material and services for which it has made firm contracts which are not canceled, it being understood that City will be entitled to such material and services. Upon determination of the amount of said pro rata compensation, City will promptly pay such amount to Supplier upon delivery by Supplier of the releases of liens and affidavit, pursuant to Section 7.C.

Section 17. FORCE MAJEURE
A. Supplier shall not be held responsible for failure or delay in shipping nor City for failure or delay in accepting goods described herein if such failure or delay is due to a Force Majeure Event.

B. A Force Majeure Event shall mean an event that materially affects a Party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the project site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the work); (4) pandemics, epidemics or quarantine restrictions; and (5) strikes Packet Page. 1562
10 and other organized labor action occurring at the project site and the effects thereof on the work, only to the extent such strikes and other organized labor action are beyond the control of Supplier and its subcontractors, of every tier, and to the extent the effects thereof cannot be avoided by use of replacement workers. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.

C. In the event of any such excused interference with shipments, City shall have the option either to reduce the quantity provided for in the order accordingly or to exercise its right of cancellation as set forth in this Agreement.

Section 18. MISCELLANEOUS PROVISIONS.

A. Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address or at such other address as the respective parties may provide in writing for this purpose:

CITY:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: LYNN MERRILL

DIRECTOR OF PUBLIC WORKS
With Copy To:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: City Attorney
SUPPLIER:
72 Hour LLC dba National Auto Fleet
Group
490 Auto Center Drive
Watsonville, CA 95076
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

B. Assignment or Transfer. Supplier shall not assign or transfer any interest in this Agreement whether by assignment or novation, without the prior written consent of the City, which will not be unreasonably withheld. Provided, however, that claims for money due or to become due Supplier from the City under this Agreement may be Packet Page. 1563
11 assigned to a financial institution or to a trustee in bankruptcy, without such approval.

Notice of any assignment or transfer, whether voluntary or involuntary, shall be furnished promptly to the City.

C. Successors and Assigns. This Agreement shall be binding on the successors and assigns of the Parties.

D. Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

E. Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

F. Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in San Bernardino County.

G. Attorneys’ Fees and Costs. If any action in law or equity, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, each Party shall pay its own attorneys’ fees.

H. Interpretation. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.

I. No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

J. Authority to Enter Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right and authority to make this Agreement and bind each respective Party.

K. Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

L. Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

M. City’s Right to Employ Other Suppliers. City reserves its right to employ other contractors in connection with the Goods.

N. Entire Agreement. This Agreement constitutes the entire agreement between the Parties relative to the Goods specified herein. There are no understandings, agreements, conditions, representations, warranties or promises with respect to this Agreement, except those contained in or referred to in the writing.

Packet Page. 1564
12 O. Electronic Signature. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature.
[SIGNATURES ON FOLLOWING PAGE]
Packet Page. 1565
13 SIGNATURE PAGE TO GOODS PURCHASE AGREEMENT

BETWEEN THE CITY OF SAN BERNARDINO
AND
72 Hour LLC dba National Auto Fleet Group
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the date first above written.

CITY OF SAN BERNARDINO
APPROVED BY:

Eric Levitt
City Manager
ATTESTED BY:

Telicia Lopez, CMC
City Clerk
APPROVED AS TO FORM:

Best Best & Krieger LLP
City Attorney
72 Hour LLC dba National Auto Fleet
Group
Signature
Name
Title
Packet Page. 1566
14 EXHIBIT A

GOODS SPECIFICATIONS
[ATTACHED]
Packet Page. 1567
15 Packet Page. 1568
16 Packet Page. 1569
17 Packet Page. 1570
18 Packet Page. 1571
19 Packet Page. 1572
20 Packet Page. 1573
21 Packet Page. 1574
22 Packet Page. 1575
23 Packet Page. 1576
24 Packet Page. 1577
25 Packet Page. 1578
26 Packet Page. 1579
27 Packet Page. 1580
28 Packet Page. 1581
29 Packet Page. 1582
30 Packet Page. 1583
31 Packet Page. 1584
32 EXHIBIT B

DELIVERY SCHEDULE
Packet Page. 1585
33 EXHIBIT C

FEE SCHEDULE
Packet Page. 1586
34 EXHIBIT C

FEE SCHEDULE
The total compensation authorized under this Agreement shall not exceed Four Hundred Forty-Nine Thousand Seven Hundred Forty Dollars and Seventy-Eight Cents ($449,740.78), which includes the base purchase price of Four Hundred Twenty-Eight Thousand Three Hundred Twenty-Four Dollars and Fifty-Five Cents ($428,324.55) for one (1) asphalt patch truck.

The total authorized amount includes a contingency in an amount not to exceed TwentyOne Thousand Four Hundred Sixteen Dollars and Twenty-Three Cents ($21,416.23), representing five percent (5%) of the base purchase price, to cover unforeseen costs associated with the manufacture, procurement, delivery, and acceptance of the vehicle.

Packet Page. 1587
032824-NAF
Rev. 3/2022 1
Solicitation Number: RFP #032824

CONTRACT
This Contract is between Sourcewell, 202 12th Street Northeast, P.O. Box 219, Staples, MN 56479 (Sourcewell) and 72 Hour LLC, dba National Auto Fleet Group, 490 Auto Center Drive, Watsonville, CA 95076 (Supplier).

Sourcewell is a State of Minnesota local government unit and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that offers cooperative procurement solutions to government entities. Participation is open to eligible federal, state/province, and municipal governmental entities, higher education, K-12 education, nonprofit, tribal government, and other public entities located in the United States and Canada.

Sourcewell issued a public solicitation for Class 4-8 Chassis and Cabs with Related Equipment, Accessories, and Services from which Supplier was awarded a contract.

Supplier desires to contract with Sourcewell to provide equipment, products, or services to Sourcewell and the entities that access Sourcewell’s cooperative purchasing contracts (Participating Entities).

1. TERM OF CONTRACT
A. EFFECTIVE DATE. This Contract is effective upon the date of the final signature below.

EXPIRATION DATE AND EXTENSION. This Contract expires July 9, 2028, unless it is cancelled sooner pursuant to Article 22. This Contract allows up to three additional one-year extensions upon the request of Sourcewell and written agreement by Supplier. Sourcewell retains the right to consider additional extensions beyond seven years as required under exceptional circumstances.

B. SURVIVAL OF TERMS. Notwithstanding any expiration or termination of this Contract, all payment obligations incurred prior to expiration or termination will survive, as will the following: Articles 11 through 14 survive the expiration or cancellation of this Contract. All other rights will cease upon expiration or termination of this Contract.

2. EQUIPMENT, PRODUCTS, OR SERVICES


   






Packet Page. 1588
032824-NAF
Rev. 3/2022 2
A. EQUIPMENT, PRODUCTS, OR SERVICES. Supplier will provide the Equipment, Products, or Services as stated in its Proposal submitted under the Solicitation Number listed above.

Supplier’s Equipment, Products, or Services Proposal (Proposal) is attached and incorporated into this Contract.

All Equipment and Products provided under this Contract must be new and the current model.

Supplier may offer close-out or refurbished Equipment or Products if they are clearly indicated in Supplier’s product and pricing list. Unless agreed to by the Participating Entities in advance, Equipment or Products must be delivered as operational to the Participating Entity’s site.

This Contract offers an indefinite quantity of sales, and while substantial volume is anticipated, sales and sales volume are not guaranteed.

B. WARRANTY. Supplier warrants that all Equipment, Products, and Services furnished are free from liens and encumbrances, and are free from defects in design, materials, and workmanship.

In addition, Supplier warrants the Equipment, Products, and Services are suitable for and will perform in accordance with the ordinary use for which they are intended. Supplier’s dealers and distributors must agree to assist the Participating Entity in reaching a resolution in any dispute over warranty terms with the manufacturer. Any manufacturer’s warranty that extends beyond the expiration of the Supplier’s warranty will be passed on to the Participating Entity.

C. DEALERS, DISTRIBUTORS, AND/OR RESELLERS. Upon Contract execution and throughout the Contract term, Supplier must provide to Sourcewell a current means to validate or authenticate Supplier’s authorized dealers, distributors, or resellers relative to the Equipment, Products, and Services offered under this Contract, which will be incorporated into this Contract by reference. It is the Supplier’s responsibility to ensure Sourcewell receives the most current information.

3. PRICING
All Equipment, Products, or Services under this Contract will be priced at or below the price stated in Supplier’s Proposal.

When providing pricing quotes to Participating Entities, all pricing quoted must reflect a Participating Entity’s total cost of acquisition. This means that the quoted cost is for delivered Equipment, Products, and Services that are operational for their intended purpose, and includes all costs to the Participating Entity’s requested delivery location.

Regardless of the payment method chosen by the Participating Entity, the total cost associated with any purchase option of the Equipment, Products, or Services must always be disclosed in the pricing quote to the applicable Participating Entity at the time of purchase. 

   






Packet Page. 1589
032824-NAF
Rev. 3/2022 3
A. SHIPPING AND SHIPPING COSTS. All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities.

Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity.

Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition.

Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.

B. SALES TAX. Each Participating Entity is responsible for supplying the Supplier with valid taxexemption certification(s). When ordering, a Participating Entity must indicate if it is a taxexempt entity.

C. HOT LIST PRICING. At any time during this Contract, Supplier may offer a specific selection of Equipment, Products, or Services at discounts greater than those listed in the Contract.

When Supplier determines it will offer Hot List Pricing, it must be submitted electronically to Sourcewell in a line-item format. Equipment, Products, or Services may be added or removed from the Hot List at any time through a Sourcewell Price and Product Change Form as defined in Article 4 below.

Hot List program and pricing may also be used to discount and liquidate close-out and discontinued Equipment and Products as long as those close-out and discontinued items are clearly identified as such. Current ordering process and administrative fees apply. Hot List Pricing must be published and made available to all Participating Entities.

4. PRODUCT AND PRICING CHANGE REQUESTS
Supplier may request Equipment, Product, or Service changes, additions, or deletions at any time. All requests must be made in writing by submitting a signed Sourcewell Price and Product Change Request Form to the assigned Sourcewell Supplier Development Administrator. This approved form is available from the assigned Sourcewell Supplier Development Administrator.

At a minimum, the request must:
x Identify the applicable Sourcewell contract number;


   






Packet Page. 1590
032824-NAF
Rev. 3/2022 4
x Clearly specify the requested change;
x Provide sufficient detail to justify the requested change; x Individually list all Equipment, Products, or Services affected by the requested change, along with the requested change (e.g., addition, deletion, price change); and x Include a complete restatement of pricing documentation in Microsoft Excel with the effective date of the modified pricing, or product addition or deletion. The new pricing restatement must include all Equipment, Products, and Services offered, even for those items where pricing remains unchanged.

A fully executed Sourcewell Price and Product Change Request Form will become an amendment to this Contract and will be incorporated by reference.

5. PARTICIPATION, CONTRACT ACCESS, AND PARTICIPATING ENTITY REQUIREMENTS

A. PARTICIPATION. Sourcewell’s cooperative contracts are available and open to public and nonprofit entities across the United States and Canada; such as federal, state/province, municipal, K-12 and higher education, tribal government, and other public entities.

The benefits of this Contract should be available to all Participating Entities that can legally access the Equipment, Products, or Services under this Contract. A Participating Entity’s authority to access this Contract is determined through its cooperative purchasing, interlocal, or joint powers laws. Any entity accessing benefits of this Contract will be considered a Service Member of Sourcewell during such time of access. Supplier understands that a Participating Entity’s use of this Contract is at the Participating Entity’s sole convenience and Participating Entities reserve the right to obtain like Equipment, Products, or Services from any other source.

Supplier is responsible for familiarizing its sales and service forces with Sourcewell contract use eligibility requirements and documentation and will encourage potential participating entities to join Sourcewell. Sourcewell reserves the right to add and remove Participating Entities to its roster during the term of this Contract.

B. PUBLIC FACILITIES. Supplier’s employees may be required to perform work at governmentowned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.

6. PARTICIPATING ENTITY USE AND PURCHASING
A. ORDERS AND PAYMENT. To access the contracted Equipment, Products, or Services under this Contract, a Participating Entity must clearly indicate to Supplier that it intends to access this Contract; however, order flow and procedure will be developed jointly between Sourcewell and Supplier. Typically, a Participating Entity will issue an order directly to Supplier or its authorized 

   






Packet Page. 1591
032824-NAF
Rev. 3/2022 5
subsidiary, distributor, dealer, or reseller. If a Participating Entity issues a purchase order, it may use its own forms, but the purchase order should clearly note the applicable Sourcewell contract number. All Participating Entity orders under this Contract must be issued prior to expiration or cancellation of this Contract; however, Supplier performance, Participating Entity payment obligations, and any applicable warranty periods or other Supplier or Participating Entity obligations may extend beyond the term of this Contract.

Supplier’s acceptable forms of payment are included in its attached Proposal. Participating Entities will be solely responsible for payment and Sourcewell will have no liability for any unpaid invoice of any Participating Entity.

B. ADDITIONAL TERMS AND CONDITIONS/PARTICIPATING ADDENDUM. Additional terms and conditions to a purchase order, or other required transaction documentation, may be negotiated between a Participating Entity and Supplier, such as job or industry-specific requirements, legal requirements (e.g., affirmative action or immigration status requirements), or specific local policy requirements. Some Participating Entities may require the use of a Participating Addendum, the terms of which will be negotiated directly between the Participating Entity and the Supplier or its authorized dealers, distributors, or resellers, as applicable. Any negotiated additional terms and conditions must never be less favorable to the Participating Entity than what is contained in this Contract.

C. SPECIALIZED SERVICE REQUIREMENTS. In the event that the Participating Entity requires service or specialized performance requirements not addressed in this Contract (such as ecommerce specifications, specialized delivery requirements, or other specifications and requirements), the Participating Entity and the Supplier may enter into a separate, standalone agreement, apart from this Contract. Sourcewell, including its agents and employees, will not be made a party to a claim for breach of such agreement.

D. TERMINATION OF ORDERS. Participating Entities may terminate an order, in whole or in part, immediately upon notice to Supplier in the event of any of the following events:

1. The Participating Entity fails to receive funding or appropriation from its governing body at levels sufficient to pay for the equipment, products, or services to be purchased; or

2. Federal, state, or provincial laws or regulations prohibit the purchase or change the Participating Entity’s requirements.

E. GOVERNING LAW AND VENUE. The governing law and venue for any action related to a Participating Entity’s order will be determined by the Participating Entity making the purchase.

7. CUSTOMER SERVICE


   






Packet Page. 1592
032824-NAF
Rev. 3/2022 6
A. PRIMARY ACCOUNT REPRESENTATIVE. Supplier will assign an Account Representative to Sourcewell for this Contract and must provide prompt notice to Sourcewell if that person is changed. The Account Representative will be responsible for:

x Maintenance and management of this Contract;
x Timely response to all Sourcewell and Participating Entity inquiries; and x Business reviews to Sourcewell and Participating Entities, if applicable.

B. BUSINESS REVIEWS. Supplier must perform a minimum of one business review with Sourcewell per contract year. The business review will cover sales to Participating Entities, pricing and contract terms, administrative fees, sales data reports, performance issues, supply issues, customer issues, and any other necessary information.

8. REPORT ON CONTRACT SALES ACTIVITY AND ADMINISTRATIVE FEE PAYMENT A. CONTRACT SALES ACTIVITY REPORT. Each calendar quarter, Supplier must provide a contract sales activity report (Report) to the Sourcewell Supplier Development Administrator assigned to this Contract. Reports are due no later than 45 days after the end of each calendar quarter. A Report must be provided regardless of the number or amount of sales during that quarter (i.e., if there are no sales, Supplier must submit a report indicating no sales were made).

The Report must contain the following fields:
x Participating Entity Name (e.g., City of Staples Highway Department); x Participating Entity Physical Street Address;
x Participating Entity City;
x Participating Entity State/Province;
x Participating Entity Zip/Postal Code;
x Participating Entity Contact Name;
x Participating Entity Contact Email Address;
x Participating Entity Contact Telephone Number;
x Sourcewell Assigned Entity/Participating Entity Number; x Item Purchased Description;
x Item Purchased Price;
x Sourcewell Administrative Fee Applied; and
x Date Purchase was invoiced/sale was recognized as revenue by Supplier.

B. ADMINISTRATIVE FEE. In consideration for the support and services provided by Sourcewell, the Supplier will pay an administrative fee to Sourcewell on all Equipment, Products, and Services provided to Participating Entities. The Administrative Fee must be included in, and not added to, the pricing. Supplier may not charge Participating Entities more than the contracted 

   






Packet Page. 1593
032824-NAF
Rev. 3/2022 7
price to offset the Administrative Fee.

The Supplier will submit payment to Sourcewell for the percentage of administrative fee stated in the Proposal multiplied by the total sales of all Equipment, Products, and Services purchased by Participating Entities under this Contract during each calendar quarter. Payments should note the Supplier’s name and Sourcewell-assigned contract number in the memo; and must be mailed to the address above “Attn: Accounts Receivable” or remitted electronically to Sourcewell’s banking institution per Sourcewell’s Finance department instructions. Payments must be received no later than 45 calendar days after the end of each calendar quarter.

Supplier agrees to cooperate with Sourcewell in auditing transactions under this Contract to ensure that the administrative fee is paid on all items purchased under this Contract.

In the event the Supplier is delinquent in any undisputed administrative fees, Sourcewell reserves the right to cancel this Contract and reject any proposal submitted by the Supplier in any subsequent solicitation. In the event this Contract is cancelled by either party prior to the Contract’s expiration date, the administrative fee payment will be due no more than 30 days from the cancellation date.

9. AUTHORIZED REPRESENTATIVE
Sourcewell's Authorized Representative is its Chief Procurement Officer.

Supplier’s Authorized Representative is the person named in the Supplier’s Proposal. If Supplier’s Authorized Representative changes at any time during this Contract, Supplier must promptly notify Sourcewell in writing.

10. AUDIT, ASSIGNMENT, AMENDMENTS, WAIVER, AND CONTRACT COMPLETE A. AUDIT. Pursuant to Minnesota Statutes Section 16C.05, subdivision 5, the books, records, documents, and accounting procedures and practices relevant to this Contract are subject to examination by Sourcewell or the Minnesota State Auditor for a minimum of six years from the end of this Contract. This clause extends to Participating Entities as it relates to business conducted by that Participating Entity under this Contract.

B. ASSIGNMENT. Neither party may assign or otherwise transfer its rights or obligations under this Contract without the prior written consent of the other party and a fully executed assignment agreement. Such consent will not be unreasonably withheld. Any prohibited assignment will be invalid.

C. AMENDMENTS. Any amendment to this Contract must be in writing and will not be effective until it has been duly executed by the parties.


   






Packet Page. 1594
032824-NAF
Rev. 3/2022 8
D. WAIVER. Failure by either party to take action or assert any right under this Contract will not be deemed a waiver of such right in the event of the continuation or repetition of the circumstances giving rise to such right. Any such waiver must be in writing and signed by the parties.

E. CONTRACT COMPLETE. This Contract represents the complete agreement between the parties. No other understanding regarding this Contract, whether written or oral, may be used to bind either party. For any conflict between the attached Proposal and the terms set out in Articles 1-22 of this Contract, the terms of Articles 1-22 will govern.

F. RELATIONSHIP OF THE PARTIES. The relationship of the parties is one of independent contractors, each free to exercise judgment and discretion with regard to the conduct of their respective businesses. This Contract does not create a partnership, joint venture, or any other relationship such as master-servant, or principal-agent.

11. INDEMNITY AND HOLD HARMLESS

Supplier must indemnify, defend, save, and hold Sourcewell and its Participating Entities, including their agents and employees, harmless from any claims or causes of action, including attorneys’ fees incurred by Sourcewell or its Participating Entities, arising out of any act or omission in the performance of this Contract by the Supplier or its agents or employees; this indemnification includes injury or death to person(s) or property alleged to have been caused by some defect in the Equipment, Products, or Services under this Contract to the extent the Equipment, Product, or Service has been used according to its specifications. Sourcewell’s responsibility will be governed by the State of Minnesota’s Tort Liability Act (Minnesota Statutes Chapter 466) and other applicable law.

12. GOVERNMENT DATA PRACTICES
Supplier and Sourcewell must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to all data provided by or provided to Sourcewell under this Contract and as it applies to all data created, collected, received, maintained, or disseminated by the Supplier under this Contract.

13. INTELLECTUAL PROPERTY, PUBLICITY, MARKETING, AND ENDORSEMENT A. INTELLECTUAL PROPERTY

1. Grant of License. During the term of this Contract:
a. Sourcewell grants to Supplier a royalty-free, worldwide, non-exclusive right and license to use the trademark(s) provided to Supplier by Sourcewell in advertising and promotional materials for the purpose of marketing Sourcewell’s relationship with Supplier.


   






Packet Page. 1595
032824-NAF
Rev. 3/2022 9
b. Supplier grants to Sourcewell a royalty-free, worldwide, non-exclusive right and license to use Supplier’s trademarks in advertising and promotional materials for the purpose of marketing Supplier’s relationship with Sourcewell.

2. Limited Right of Sublicense. The right and license granted herein includes a limited right of each party to grant sublicenses to their respective subsidiaries, distributors, dealers, resellers, marketing representatives, and agents (collectively “Permitted Sublicensees”) in advertising and promotional materials for the purpose of marketing the Parties’ relationship to Participating Entities. Any sublicense granted will be subject to the terms and conditions of this Article. Each party will be responsible for any breach of this Article by any of their respective sublicensees.

3. Use; Quality Control.
a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.
b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.

4. Termination. Upon the termination of this Contract for any reason, each party, including Permitted Sublicensees, will have 30 days to remove all Trademarks from signage, websites, and the like bearing the other party’s name or logo (excepting Sourcewell’s pre-printed catalog of suppliers which may be used until the next printing). Supplier must return all marketing and promotional materials, including signage, provided by Sourcewell, or dispose of it according to Sourcewell’s written directions.

B. PUBLICITY. Any publicity regarding the subject matter of this Contract must not be released without prior written approval from the Authorized Representatives. Publicity includes notices, informational pamphlets, press releases, research, reports, signs, and similar public notices prepared by or for the Supplier individually or jointly with others, or any subcontractors, with respect to the program, publications, or services provided resulting from this Contract.

C. MARKETING. Any direct advertising, marketing, or offers with Participating Entities must be approved by Sourcewell. Send all approval requests to the Sourcewell Supplier Development Administrator assigned to this Contract.

D. ENDORSEMENT. The Supplier must not claim that Sourcewell endorses its Equipment, Products, or Services.


   






Packet Page. 1596
032824-NAF
Rev. 3/2022 10

14. GOVERNING LAW, JURISDICTION, AND VENUE
The substantive and procedural laws of the State of Minnesota will govern this Contract. Venue for all legal proceedings arising out of this Contract, or its breach, must be in the appropriate state court in Todd County, Minnesota or federal court in Fergus Falls, Minnesota.

15. FORCE MAJEURE
Neither party to this Contract will be held responsible for delay or default caused by acts of God or other conditions that are beyond that party’s reasonable control. A party defaulting under this provision must provide the other party prompt written notice of the default.

16. SEVERABILITY
If any provision of this Contract is found by a court of competent jurisdiction to be illegal, unenforceable, or void then both parties will be relieved from all obligations arising from that provision. If the remainder of this Contract is capable of being performed, it will not be affected by such determination or finding and must be fully performed.

17. PERFORMANCE, DEFAULT, AND REMEDIES
A. PERFORMANCE. During the term of this Contract, the parties will monitor performance and address unresolved contract issues as follows:

1. Notification. The parties must promptly notify each other of any known dispute and work in good faith to resolve such dispute within a reasonable period of time. If necessary, Sourcewell and the Supplier will jointly develop a short briefing document that describes the issue(s), relevant impact, and positions of both parties.

2. Escalation. If parties are unable to resolve the issue in a timely manner, as specified above, either Sourcewell or Supplier may escalate the resolution of the issue to a higher level of management. The Supplier will have 30 calendar days to cure an outstanding issue.

3. Performance while Dispute is Pending. Notwithstanding the existence of a dispute, the Supplier must continue without delay to carry out all of its responsibilities under the Contract that are not affected by the dispute. If the Supplier fails to continue without delay to perform its responsibilities under the Contract, in the accomplishment of all undisputed work, the Supplier will bear any additional costs incurred by Sourcewell and/or its Participating Entities as a result of such failure to proceed.

B. DEFAULT AND REMEDIES. Either of the following constitutes cause to declare this Contract, or any Participating Entity order under this Contract, in default:

1. Nonperformance of contractual requirements, or

2. A material breach of any term or condition of this Contract. 

   






Packet Page. 1597
032824-NAF
Rev. 3/2022 11
The party claiming default must provide written notice of the default, with 30 calendar days to cure the default. Time allowed for cure will not diminish or eliminate any liability for liquidated or other damages. If the default remains after the opportunity for cure, the non-defaulting party may:
x Exercise any remedy provided by law or equity, or
x Terminate the Contract or any portion thereof, including any orders issued against the Contract.

18. INSURANCE

A. REQUIREMENTS. At its own expense, Supplier must maintain insurance policy(ies) in effect at all times during the performance of this Contract with insurance company(ies) licensed or authorized to do business in the State of Minnesota having an “AM BEST” rating of A- or better, with coverage and limits of insurance not less than the following:

1. Workers’ Compensation and Employer’s Liability.

Workers’ Compensation: As required by any applicable law or regulation.

Employer's Liability Insurance: must be provided in amounts not less than listed below:

Minimum limits:
$500,000 each accident for bodily injury by accident
$500,000 policy limit for bodily injury by disease
$500,000 each employee for bodily injury by disease

2. Commercial General Liability Insurance. Supplier will maintain insurance covering its operations, with coverage on an occurrence basis, and must be subject to terms no less broad than the Insurance Services Office (“ISO”) Commercial General Liability Form CG0001 (2001 or newer edition), or equivalent. At a minimum, coverage must include liability arising from premises, operations, bodily injury and property damage, independent contractors, products-completed operations including construction defect, contractual liability, blanket contractual liability, and personal injury and advertising injury. All required limits, terms and conditions of coverage must be maintained during the term of this Contract.

Minimum Limits:
$1,000,000 each occurrence Bodily Injury and Property Damage $1,000,000 Personal and Advertising Injury
$2,000,000 aggregate for products liability-completed operations $2,000,000 general aggregate

3. Commercial Automobile Liability Insurance. During the term of this Contract, Supplier will maintain insurance covering all owned, hired, and non-owned automobiles in limits of liability not less than indicated below. The coverage must be subject to terms 

   






Packet Page. 1598
032824-NAF
Rev. 3/2022 12
no less broad than ISO Business Auto Coverage Form CA 0001 (2010 edition or newer), or equivalent.

Minimum Limits:
$1,000,000 each accident, combined single limit

4. Umbrella Insurance. During the term of this Contract, Supplier will maintain umbrella coverage over Employer’s Liability, Commercial General Liability, and Commercial Automobile.

Minimum Limits:
$2,000,000

5. Professional/Technical, Errors and Omissions, and/or Miscellaneous Professional Liability. During the term of this Contract, Supplier will maintain coverage for all claims the Supplier may become legally obligated to pay resulting from any actual or alleged negligent act, error, or omission related to Supplier’s professional services required under this Contract.

Minimum Limits:
$2,000,000 per claim or event
$2,000,000 – annual aggregate

6. Network Security and Privacy Liability Insurance. During the term of this Contract, Supplier will maintain coverage for network security and privacy liability. The coverage may be endorsed on another form of liability coverage or written on a standalone policy. The insurance must cover claims which may arise from failure of Supplier’s security resulting in, but not limited to, computer attacks, unauthorized access, disclosure of not public data – including but not limited to, confidential or private information, transmission of a computer virus, or denial of service.

Minimum limits:
$2,000,000 per occurrence
$2,000,000 annual aggregate
Failure of Supplier to maintain the required insurance will constitute a material breach entitling Sourcewell to immediately terminate this Contract for default.

B. CERTIFICATES OF INSURANCE. Prior to commencing under this Contract, Supplier must furnish to Sourcewell a certificate of insurance, as evidence of the insurance required under this Contract. Prior to expiration of the policy(ies), renewal certificates must be mailed to Sourcewell, 202 12th Street Northeast, P.O. Box 219, Staples, MN 56479 or sent to the Sourcewell Supplier Development Administrator assigned to this Contract. The certificates must be signed by a person authorized by the insurer(s) to bind coverage on their behalf. 

   






Packet Page. 1599
032824-NAF
Rev. 3/2022 13
Failure to request certificates of insurance by Sourcewell, or failure of Supplier to provide certificates of insurance, in no way limits or relieves Supplier of its duties and responsibilities in this Contract.

C. ADDITIONAL INSURED ENDORSEMENT AND PRIMARY AND NON-CONTRIBUTORY INSURANCE CLAUSE. Supplier agrees to list Sourcewell and its Participating Entities, including their officers, agents, and employees, as an additional insured under the Supplier’s commercial general liability insurance policy with respect to liability arising out of activities, “operations,” or “work” performed by or on behalf of Supplier, and products and completed operations of Supplier. The policy provision(s) or endorsement(s) must further provide that coverage is primary and not excess over or contributory with any other valid, applicable, and collectible insurance or self-insurance in force for the additional insureds.

D. WAIVER OF SUBROGATION. Supplier waives and must require (by endorsement or otherwise) all its insurers to waive subrogation rights against Sourcewell and other additional insureds for losses paid under the insurance policies required by this Contract or other insurance applicable to the Supplier or its subcontractors. The waiver must apply to all deductibles and/or self-insured retentions applicable to the required or any other insurance maintained by the Supplier or its subcontractors. Where permitted by law, Supplier must require similar written express waivers of subrogation and insurance clauses from each of its subcontractors.

E. UMBRELLA/EXCESS LIABILITY/SELF-INSURED RETENTION. The limits required by this Contract can be met by either providing a primary policy or in combination with umbrella/excess liability policy(ies), or self-insured retention.

19. COMPLIANCE
A. LAWS AND REGULATIONS. All Equipment, Products, or Services provided under this Contract must comply fully with applicable federal laws and regulations, and with the laws in the states and provinces in which the Equipment, Products, or Services are sold.

B. LICENSES. Supplier must maintain a valid and current status on all required federal, state/provincial, and local licenses, bonds, and permits required for the operation of the business that the Supplier conducts with Sourcewell and Participating Entities.

20. BANKRUPTCY, DEBARMENT, OR SUSPENSION CERTIFICATION
Supplier certifies and warrants that it is not in bankruptcy or that it has previously disclosed in writing certain information to Sourcewell related to bankruptcy actions. If at any time during this Contract Supplier declares bankruptcy, Supplier must immediately notify Sourcewell in writing.


   






Packet Page. 1600
032824-NAF
Rev. 3/2022 14
Supplier certifies and warrants that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from programs operated by the State of Minnesota; the United States federal government or the Canadian government, as applicable; or any Participating Entity. Supplier certifies and warrants that neither it nor its principals have been convicted of a criminal offense related to the subject matter of this Contract. Supplier further warrants that it will provide immediate written notice to Sourcewell if this certification changes at any time.

21. PROVISIONS FOR NON-UNITED STATES FEDERAL ENTITY PROCUREMENTS UNDER

UNITED STATES FEDERAL AWARDS OR OTHER AWARDS
Participating Entities that use United States federal grant or FEMA funds to purchase goods or services from this Contract may be subject to additional requirements including the procurement standards of the Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal Awards, 2 C.F.R. § 200. Participating Entities may have additional requirements based on specific funding source terms or conditions. Within this Article, all references to “federal” should be interpreted to mean the United States federal government.

The following list only applies when a Participating Entity accesses Supplier’s Equipment, Products, or Services with United States federal funds.

A. EQUAL EMPLOYMENT OPPORTUNITY. Except as otherwise provided under 41 C.F.R. § 60, all contracts that meet the definition of “federally assisted construction contract” in 41 C.F.R. § 60-

1.3 must include the equal opportunity clause provided under 41 C.F.R. §60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 C.F.R. §, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 C.F.R. § 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” The equal opportunity clause is incorporated herein by reference.

B. DAVIS-BACON ACT, AS AMENDED (40 U.S.C. § 3141-3148). When required by federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonfederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. § 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 C.F.R. § 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-federal entity must report all suspected or reported violations to the federal awarding agency. The contracts must also include a provision for compliance with 

   






Packet Page. 1601
032824-NAF
Rev. 3/2022 15
the Copeland “Anti-Kickback” Act (40 U.S.C. § 3145), as supplemented by Department of Labor regulations (29 C.F.R. § 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-federal entity must report all suspected or reported violations to the federal awarding agency. Supplier must be in compliance with all applicable Davis-Bacon Act provisions.

C. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (40 U.S.C. § 3701-3708). Where applicable, all contracts awarded by the non-federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. §§ 3702 and 3704, as supplemented by Department of Labor regulations (29 C.F.R. § 5).

Under 40 U.S.C. § 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. § 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. This provision is hereby incorporated by reference into this Contract. Supplier certifies that during the term of an award for all contracts by Sourcewell resulting from this procurement process, Supplier must comply with applicable requirements as referenced above.

D. RIGHTS TO INVENTIONS MADE UNDER A CONTRACT OR AGREEMENT. If the federal award meets the definition of “funding agreement” under 37 C.F.R. § 401.2(a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 C.F.R. § 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency. Supplier certifies that during the term of an award for all contracts by Sourcewell resulting from this procurement process, Supplier must comply with applicable requirements as referenced above.

E. CLEAN AIR ACT (42 U.S.C. § 7401-7671Q.) AND THE FEDERAL WATER POLLUTION CONTROL ACT (33 U.S.C. § 1251-1387). Contracts and subgrants of amounts in excess of $150,000 require the non-federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. § 7401- 7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. § 1251- 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). 

   






Packet Page. 1602
032824-NAF
Rev. 3/2022 16
Supplier certifies that during the term of this Contract will comply with applicable requirements as referenced above.

F. DEBARMENT AND SUSPENSION (EXECUTIVE ORDERS 12549 AND 12689). A contract award (see 2 C.F.R. § 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 C.F.R. §180 that implement Executive Orders 12549 (3 C.F.R. § 1986 Comp., p. 189) and 12689 (3 C.F.R. § 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. Supplier certifies that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.

G. BYRD ANTI-LOBBYING AMENDMENT, AS AMENDED (31 U.S.C. § 1352). Suppliers must file any required certifications. Suppliers must not have used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Suppliers must disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal award. Such disclosures are forwarded from tier to tier up to the non-federal award. Suppliers must file all certifications and disclosures required by, and otherwise comply with, the Byrd Anti-Lobbying Amendment (31 U.S.C. § 1352).

H. RECORD RETENTION REQUIREMENTS. To the extent applicable, Supplier must comply with the record retention requirements detailed in 2 C.F.R. § 200.333. The Supplier further certifies that it will retain all records as required by 2 C.F.R. § 200.333 for a period of 3 years after grantees or subgrantees submit final expenditure reports or quarterly or annual financial reports, as applicable, and all other pending matters are closed.

I. ENERGY POLICY AND CONSERVATION ACT COMPLIANCE. To the extent applicable, Supplier must comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.

J. BUY AMERICAN PROVISIONS COMPLIANCE. To the extent applicable, Supplier must comply with all applicable provisions of the Buy American Act. Purchases made in accordance with the Buy American Act must follow the applicable procurement rules calling for free and open competition.

K. ACCESS TO RECORDS (2 C.F.R. § 200.336). Supplier agrees that duly authorized representatives of a federal agency must have access to any books, documents, papers and 

   






Packet Page. 1603
032824-NAF
Rev. 3/2022 17
records of Supplier that are directly pertinent to Supplier’s discharge of its obligations under this Contract for the purpose of making audits, examinations, excerpts, and transcriptions. The right also includes timely and reasonable access to Supplier’s personnel for the purpose of interview and discussion relating to such documents.

L. PROCUREMENT OF RECOVERED MATERIALS (2 C.F.R. § 200.322). A non-federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 C.F.R. § 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

M. FEDERAL SEAL(S), LOGOS, AND FLAGS. The Supplier cannot use the seal(s), logos, crests, or reproductions of flags or likenesses of Federal agency officials without specific pre-approval.

N. NO OBLIGATION BY FEDERAL GOVERNMENT. The U.S. federal government is not a party to this Contract or any purchase by a Participating Entity and is not subject to any obligations or liabilities to the Participating Entity, Supplier, or any other party pertaining to any matter resulting from the Contract or any purchase by an authorized user.

O. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS OR RELATED ACTS. The Contractor acknowledges that 31 U.S.C. 38 (Administrative Remedies for False Claims and Statements) applies to the Supplier’s actions pertaining to this Contract or any purchase by a Participating Entity.

P. FEDERAL DEBT. The Supplier certifies that it is non-delinquent in its repayment of any federal debt. Examples of relevant debt include delinquent payroll and other taxes, audit disallowance, and benefit overpayments.

Q. CONFLICTS OF INTEREST. The Supplier must notify the U.S. Office of General Services, Sourcewell, and Participating Entity as soon as possible if this Contract or any aspect related to the anticipated work under this Contract raises an actual or potential conflict of interest (as described in 2 C.F.R. Part 200). The Supplier must explain the actual or potential conflict in writing in sufficient detail so that the U.S. Office of General Services, Sourcewell, and Participating Entity are able to assess the actual or potential conflict; and provide any additional information as necessary or requested.


   






Packet Page. 1604
032824-NAF
Rev. 3/2022 18
R. U.S. EXECUTIVE ORDER 13224. The Supplier, and its subcontractors, must comply with U.S.

Executive Order 13224 and U.S. Laws that prohibit transactions with and provision of resources and support to individuals and organizations associated with terrorism.

S. PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. To the extent applicable, Supplier certifies that during the term of this Contract it will comply with applicable requirements of 2 C.F.R. § 200.216.

T. DOMESTIC PREFERENCES FOR PROCUREMENTS. To the extent applicable, Supplier certifies that during the term of this Contract will comply with applicable requirements of 2 C.F.R. § 200.322.

22. CANCELLATION
Sourcewell or Supplier may cancel this Contract at any time, with or without cause, upon 60 days’ written notice to the other party. However, Sourcewell may cancel this Contract immediately upon discovery of a material defect in any certification made in Supplier’s Proposal. Cancellation of this Contract does not relieve either party of financial, product, or service obligations incurred or accrued prior to cancellation.

Sourcewell 72 Hour LLC, dba National Auto Fleet Group
By: __________________________ By: __________________________ Jeremy Schwartz Jesse Cooper
Title: Chief Procurement Officer Title: National Fleet Manager Date: ________________________ Date: ________________________ 

   














Packet Page. 1605
5)3&ODVV&KDVVLVDQG&DEVZLWK5HODWHG
(TXLSPHQW$FFHVVRULHVDQG6HUYLFHV
9HQGRU'HWDLOV
&RPSDQ\1DPH
+285//&
'RHV\RXUFRPSDQ\FRQGXFW
EXVLQHVVXQGHUDQ\RWKHUQDPH",I
\HVSOHDVHVWDWH

1DWLRQDO$XWR)OHHW*URXS
$GGUHVV


$XWR&HQWHU'ULYH
:DWVRQYLOOH&$

&RQWDFW
-HVVH&RRSHU
(PDLO
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
3KRQH


)D[


+67


6XEPLVVLRQ'HWDLOV
&UHDWHG2Q
7KXUVGD\)HEUXDU\



6XEPLWWHG2Q
:HGQHVGD\0DUFK



6XEPLWWHG%\
-HVVH&RRSHU
(PDLO
-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP
7UDQVDFWLRQ
GHIDEDEEI
EI
6XEPLWWHU
V,3$GGUHVV

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1606
6SHFLILFDWLRQV
7DEOH
3URSRVHU,GHQWLW\ $XWKRUL]HG5HSUHVHQWDWLYHV
*HQHUDO,QVWUXFWLRQV
DSSOLHVWRDOO7DEOHV
6RXUFHZHOOSUHIHUVDEULHIEXWWKRURXJKUHVSRQVHWRHDFKTXHVWLRQ'RQRWPHUHO\DWWDFKDGGLWLRQDOGRFXPHQWVWR\RXUUHVSRQVHZLWKRXWDOVR SURYLGLQJDVXEVWDQWLYHUHVSRQVH'RQRWOHDYHDQVZHUVEODQN UHVSRQG³1$´LIWKHTXHVWLRQGRHVQRWDSSO\WR\RX
SUHIHUDEO\ZLWKDQH[SODQDWLRQ

/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 3URSRVHUௐ/HJDOௐ1DPHௐ
RQHௐOHJDOௐHQWLW\ௐRQO\

ௐௐ
,QௐWKHௐHYHQWௐRI
DZDUGௐZLOOௐH[HFXWHௐWKHௐUHVXOWLQJௐFRQWUDFWௐDVௐ6XSSOLHU

ௐ+285ௐ//& 

 ,GHQWLI\ௐDOOௐVXEVLGLDU\ௐHQWLWLHVௐRIௐWKHௐ3URSRVHUௐZKRVHௐHTXLSPHQWௐ SURGXFWVௐRUௐVHUYLFHVௐDUHௐLQFOXGHGௐLQௐWKHௐ3URSRVDO
ௐ+RXUௐ//& 

 ,GHQWLI\ௐDOOௐDSSOLFDEOHௐDVVXPHGௐQDPHVௐRUௐ'%$ௐQDPHVௐRIௐWKHௐ 3URSRVHUௐRUௐ3URSRVHU
VௐVXEVLGLDULHVௐLQௐ/LQHௐௐRUௐ/LQHௐௐDERYH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS 

 3URYLGHௐ\RXUௐ&$*(ௐFRGHௐRUௐ8QLTXHௐ(QWLW\ௐ,GHQWLILHUௐ
6$0

<)+'=='< 

 3URSRVHUௐ3K\VLFDOௐ$GGUHVV

ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ
 

 3URSRVHUௐZHEVLWHௐDGGUHVVௐ
RUௐDGGUHVVHV

ZZZ1DWLRQDODXWRIOHHWJURXSFRP 

 3URSRVHU
Vௐ$XWKRUL]HGௐ5HSUHVHQWDWLYHௐ
QDPHௐWLWOHௐDGGUHVVௐHPDLOௐ
DGGUHVVௐ ௐSKRQH
ௐ
7KHௐUHSUHVHQWDWLYHௐPXVWௐKDYHௐDXWKRULW\ௐWRௐ
VLJQௐWKHௐ³3URSRVHU¶Vௐ$VVXUDQFHௐRIௐ&RPSOLDQFH´ௐRQௐEHKDOIௐRIௐWKHௐ 3URSRVHUௐDQGௐLQௐWKHௐHYHQWௐRIௐDZDUGௐZLOOௐEHௐH[SHFWHGௐWRௐH[HFXWHௐ WKHௐUHVXOWLQJௐFRQWUDFW

-HVVHௐ&RRSHU
1DWLRQDOௐ)OHHWௐ0DQDJHU

ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ

-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP




 3URSRVHU
VௐSULPDU\ௐFRQWDFWௐIRUௐWKLVௐSURSRVDOௐ
QDPHௐWLWOHௐDGGUHVVௐ
HPDLOௐDGGUHVVௐ ௐSKRQH

-HVVHௐ&RRSHU
1DWLRQDOௐ)OHHWௐ0DQDJHU

ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ

-FRRSHU#QDWLRQDODXWRIOHHWJURXSFRP




3URSRVHU
VௐRWKHUௐFRQWDFWVௐIRUௐWKLVௐSURSRVDOௐLIௐDQ\ௐ
QDPHௐWLWOHௐ
DGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH

&ODUNHௐ&RRSHU
1DWLRQDOௐ)OHHWௐ0DQDJHU

ௐ$XWRௐ&HQWHUௐ'ULYH
:DWVRQYLOOHௐ&$ௐ

&ODUNHFRRSHU#ZDWVRQYLOOHIOHHWJURXSFRPௐ

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1607
7DEOH
&RPSDQ\,QIRUPDWLRQDQG)LQDQFLDO6WUHQJWK
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 3URYLGHௐDௐEULHIௐKLVWRU\ௐRIௐ\RXUௐFRPSDQ\ௐLQFOXGLQJௐ\RXUௐ FRPSDQ\¶VௐFRUHௐYDOXHVௐEXVLQHVVௐSKLORVRSK\ௐDQGௐLQGXVWU\ௐ ORQJHYLW\ௐUHODWHGௐWRௐWKHௐUHTXHVWHGௐHTXLSPHQWௐSURGXFWVௐRUௐVHUYLFHV 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZDVௐHVWDEOLVKHGௐLQௐ
ௐLQௐ6RXWKHUQௐ&DOLIRUQLDௐDQGௐERDVWVௐDௐULFKௐKLVWRU\ௐRIௐIDPLO\GULYHQௐ VXFFHVVௐ)URPௐKXPEOHௐEHJLQQLQJVௐZLWKௐDௐVLQJOHௐGHDOHUVKLSௐZH YHௐJURZQௐLQWRௐDௐQDWLRQZLGHௐQHWZRUNௐRIௐRYHUௐௐ
GHDOHUVKLSVௐWKDQNVௐWRௐWKHௐGHGLFDWLRQௐDQGௐYLVLRQௐRIௐRXUௐIDWKHU 2QHௐRIௐRXUௐFRUHௐYDOXHVௐKDVௐDOZD\VௐEHHQௐIRVWHULQJௐDௐVWURQJௐFRPSDQ\ௐFXOWXUHௐDQGௐZHௐDFKLHYHௐWKLVௐE\ௐSULRULWL]LQJௐLQWHUQDOௐ JURZWKௐ:HௐSURXGO\ௐSURPRWHௐIURPௐZLWKLQௐOHYHUDJLQJௐWKHௐWDOHQWௐDQGௐH[SHULHQFHௐRIௐRXUௐGHGLFDWHGௐWHDPௐPHPEHUVௐ7KLVௐ DSSURDFKௐQRWௐRQO\ௐHQVXUHVௐFRQWLQXLW\ௐDQGௐDௐGHHSௐXQGHUVWDQGLQJௐRIௐRXUௐYDOXHVௐEXWௐDOVRௐIRVWHUVௐDௐVHQVHௐRIௐOR\DOW\ௐDQGௐ EHORQJLQJௐDPRQJௐRXUௐHPSOR\HHV
7KLVௐFRPPLWPHQWௐWRௐLQWHUQDOௐGHYHORSPHQWௐKDVௐEHHQௐLQVWUXPHQWDOௐLQௐRXUௐH[SDQVLRQௐDOORZLQJௐXVௐWRௐFXOWLYDWHௐDௐOHDGHUVKLSௐ WHDPௐWKDWௐHPERGLHVௐRXUௐFRUHௐYDOXHVௐDQGௐGULYHVௐRXUௐFRQWLQXHGௐVXFFHVVௐ:HௐDUHௐSURXGௐRIௐWKHௐMRXUQH\ௐZH YHௐWDNHQௐDQGௐ
H[FLWHGௐIRUௐWKHௐIXWXUHௐDVௐZHௐFRQWLQXHௐWRௐHPSRZHUௐRXUௐWHDPௐDQGௐSURYLGHௐH[FHSWLRQDOௐVHUYLFHௐWRௐRXUௐFXVWRPHUV )RUௐRYHUௐௐ\HDUVௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐUHPDLQHGௐDௐIDPLO\RZQHGௐDQGௐRSHUDWHGௐFRPSDQ\ௐ7KHௐ&RRSHUௐIDPLO\ௐ KDVௐGHHSௐURRWVௐLQௐWKHௐDXWRPRELOHௐLQGXVWU\ௐZLWKௐDௐSDVVLRQௐIRUௐH[FHHGLQJௐH[SHFWDWLRQVௐSDVVHGௐGRZQௐWKURXJKௐJHQHUDWLRQVௐ 7RGD\ௐHYHQௐRXUௐIXWXUHௐJHQHUDWLRQVௐDUHௐOHDUQLQJௐWKHௐURSHVௐHQVXULQJௐGHFDGHVௐPRUHௐRIௐLQGXVWU\ௐOHDGHUVKLS :HௐDUHQ
WௐMXVWௐVHOOLQJௐYHKLFOHV
ௐZH
UHௐEXLOGLQJௐUHODWLRQVKLSVௐWKDWௐODVWௐ2XUௐIDPLO\ௐYDOXHVௐRIௐLQWHJULW\ௐGHGLFDWLRQௐDQGௐ FXVWRPHUௐVHUYLFHௐSHUPHDWHௐHYHU\WKLQJௐZHௐGRௐ7KLVௐFRPPLWPHQWௐKDVௐHDUQHGௐXVௐQXPHURXVௐLQGXVWU\ௐDZDUGVௐDQGௐWKHௐWUXVWௐ RIௐFRXQWOHVVௐFOLHQWVௐ%XWௐWKLVௐLVௐMXVWௐWKHௐEHJLQQLQJௐ:LWKௐIUHVKௐSHUVSHFWLYHVௐIURPௐIXWXUHௐJHQHUDWLRQVௐMRLQLQJௐWKHௐWHDPௐ ZH
UHௐH[FLWHGௐWRௐOHDGௐWKHௐLQGXVWU\ௐIRUௐGHFDGHVௐWRௐFRPH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVQ
WௐMXVWௐDERXWௐGHOLYHULQJௐYHKLFOHV
ௐLW
VௐDERXWௐGHOLYHULQJௐSHDFHௐRIௐPLQGௐ2XUௐXQZDYHULQJௐ
FRPPLWPHQWௐWRௐWKHௐௐ5,*+7V
ௐGHOLYHULQJௐWKHௐ5,*+7ௐYHKLFOHௐDWௐWKHௐ5,*+7ௐWLPHௐWRௐWKHௐ5,*+7ௐSODFHௐDQGௐDWௐWKHௐ5,*+7ௐ SULFHௐHQVXUHVௐRXUௐFOLHQWVௐH[SHULHQFHௐXQPDWFKHGௐVDWLVIDFWLRQௐDQGௐVXFFHVV 6LQFHௐ
ௐZH
YHௐZLWQHVVHGௐWKHௐDXWRௐLQGXVWU\ௐVKLIWௐJHDUVௐHYROYLQJௐIURPௐJDVSRZHUHGௐPDFKLQHVௐWRௐWKHௐFXWWLQJௐHGJHௐRIௐ DOOHOHFWULFௐDQGௐIXHOௐFHOOௐWHFKQRORJ\ௐ7KURXJKௐLWௐDOOௐRQHௐWKLQJௐKDVௐUHPDLQHGௐFRQVWDQW ௐRXUௐFRUHௐYDOXHV
(YHQௐLQௐWRGD\
VௐUDSLGO\ௐFKDQJLQJௐODQGVFDSHௐZHௐKROGௐVWHDGIDVWௐWRௐWKHௐSULQFLSOHVௐWKDWௐKDYHௐJXLGHGௐXVௐIRUௐGHFDGHVௐ7KHVHௐ YDOXHVௐ±ௐLQWHUQDOௐJURZWKௐFXVWRPHUௐIRFXVௐHIILFLHQF\ௐWHDPZRUNௐDFFRXQWDELOLW\ௐDQGௐLQWHJULW\ௐDUHௐWKHௐHQJLQHௐWKDWௐSRZHUVௐ RXUௐJURZWKௐDQGௐIXHOVௐRXUௐFRPPLWPHQWௐWRௐH[FHHGLQJௐH[SHFWDWLRQV :KLOHௐWKHௐYHKLFOHVௐZHௐRIIHUௐPD\ௐKDYHௐFKDQJHGௐRXUௐGHGLFDWLRQௐWRௐSURYLGLQJௐVXSHULRUௐFXVWRPHUௐVHUYLFHௐUHPDLQVௐDVௐVWURQJௐ DVௐHYHUௐ:HௐHPEUDFHௐWKHௐIXWXUHௐZLWKௐWKHௐVDPHௐSDVVLRQௐDQGௐGHWHUPLQDWLRQௐWKDWௐIXHOHGௐRXUௐVXFFHVVௐLQௐWKHௐSDVWௐHQVXULQJௐ WKDWௐRXUௐFXVWRPHUVௐFRQWLQXHௐWRௐUHFHLYHௐWKHௐH[FHSWLRQDOௐVHUYLFHௐWKH\ௐGHVHUYH 

 :KDWௐDUHௐ\RXUௐFRPSDQ\¶VௐH[SHFWDWLRQVௐLQௐWKHௐHYHQWௐRIௐDQௐDZDUG" 6HFXULQJௐDQRWKHUௐ6RXUFHZHOOௐFRQWUDFWௐZRXOGௐPDUNௐRXUௐVL[WKௐSURSHOOLQJௐXVௐWRௐHYHQௐJUHDWHUௐKHLJKWVௐE\ௐOHYHUDJLQJௐRXUௐ SURYHQௐWUDFNௐUHFRUGௐRIௐVHUYLQJௐFXVWRPHUVௐQDWLRQZLGHௐ7KLVௐH[SDQVLRQௐIXHOVௐRXUௐFRPPLWPHQWௐWRௐLQYHVWௐLQௐRXUௐGLYLVLRQVௐ SDUWLFXODUO\ௐRXUௐ3DUWQHUௐ3URJUDPௐ
GHWDLOVௐLQௐXSORDGHGௐ=LSௐILOH
ௐ7KLVௐLQQRYDWLYHௐSURJUDPௐHPSRZHUVௐPHPEHUVௐWRௐ
UHFRPPHQGௐORFDOௐXSILWWHUVௐIRVWHULQJௐZLQZLQௐSDUWQHUVKLSVௐDQGௐGHOLYHULQJ 

 'HPRQVWUDWHௐ\RXUௐILQDQFLDOௐVWUHQJWKௐDQGௐVWDELOLW\ௐZLWKௐPHDQLQJIXOௐ GDWDௐ7KLVௐFRXOGௐLQFOXGHௐVXFKௐLWHPVௐDVௐILQDQFLDOௐVWDWHPHQWVௐ6(&ௐ ILOLQJVௐFUHGLWௐDQGௐERQGௐUDWLQJVௐOHWWHUVௐRIௐFUHGLWௐDQGௐGHWDLOHGௐ UHIHUHQFHௐOHWWHUVௐ8SORDGௐVXSSRUWLQJௐGRFXPHQWVௐ
DVௐDSSOLFDEOH
ௐLQௐ
WKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
:HௐKDYHௐGHPRQVWUDWHGௐWKURXJKRXWௐWKHௐSDVWௐௐ\HDUVௐWRௐRXUௐILQDQFLDOௐLQVWLWXWLRQVௐWKDWௐZHௐVWDELOLW\ௐLQௐWKHௐPDUNHWௐSODFHௐ DQGௐZLWKௐWKLVௐPHDQLQJௐGDWDௐRXUௐEDQNௐKDVௐSURYLGHGௐXVௐZLWKௐDௐௐௐIORRUௐSODQௐOLPLWௐWRௐKHOSௐLQௐRXUௐJURZLQJௐ RSHUDWLRQVௐZKLFKௐLQFOXGHௐ6RXUFHZHOOௐ0HPEHUV 

 :KDWௐLVௐ\RXUௐ86ௐPDUNHWௐVKDUHௐIRUௐWKHௐVROXWLRQVௐWKDWௐ\RXௐDUHௐ SURSRVLQJ"
2XUௐ86ௐPDUNHWௐVKDUHௐIRUௐWKHௐSURGXFWVௐDQGௐPRGHOVௐZHௐDUHௐRIIHULQJௐLVௐURXJKO\ௐௐDVௐUHSUHVHQWHGௐE\ௐWKHௐௐ PDQXIDFWXUHUV 

 :KDWௐLVௐ\RXUௐ&DQDGLDQௐPDUNHWௐVKDUHௐIRUௐWKHௐVROXWLRQVௐWKDWௐ\RX DUHௐSURSRVLQJ"
:KLOHௐZHௐKDYHQ
Wௐ\HWௐHQWHUHGௐWKHௐ&DQDGLDQௐPDUNHWௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS VௐSURYHQௐWUDFNௐUHFRUGௐRIௐVXFFHVVௐIXHOVௐ
RXUௐDJJUHVVLYHௐH[SDQVLRQௐSODQVௐZLWKௐDௐVWURQJௐIRFXVௐRQௐLQWHUQDWLRQDOௐPDUNHWVௐOLNHௐ&DQDGDௐ:HௐDUHௐFRQILGHQWௐWKDWௐRXUௐ H[SHUWLVHௐDQGௐFRPPLWPHQWௐWRௐLQQRYDWLRQௐZLOOௐDOORZௐXVௐWRௐPDNHௐDௐVLJQLILFDQWௐLPSDFWௐLQௐWKHௐQHDUௐIXWXUHௐH[SDQGLQJௐRXUௐ UHDFKௐDQGௐVHUYLQJௐFXVWRPHUVௐDFURVVௐQHZௐERUGHUV


 +DVௐ\RXUௐEXVLQHVVௐHYHUௐSHWLWLRQHGௐIRUௐEDQNUXSWF\ௐSURWHFWLRQ"ௐ,Iௐ VRௐH[SODLQௐLQௐGHWDLO
1R 

 +RZௐLVௐ\RXUௐRUJDQL]DWLRQௐEHVWௐGHVFULEHG
ௐLVௐLWௐDௐPDQXIDFWXUHUௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐRUௐDௐVHUYLFHௐSURYLGHU"ௐௐ$QVZHUௐ ZKLFKHYHUௐTXHVWLRQௐ
HLWKHUௐD
ௐRUௐE
ௐMXVWௐEHORZ
ௐEHVWௐDSSOLHVௐWR
\RXUௐRUJDQL]DWLRQ
D
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐ
RUௐVLPLODUௐHQWLW\
ௐSURYLGHௐ\RXUௐZULWWHQௐ
DXWKRUL]DWLRQௐWRௐDFWௐDVௐDௐGLVWULEXWRUGHDOHUUHVHOOHUௐIRUௐWKHௐ PDQXIDFWXUHUௐRIௐWKHௐSURGXFWVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ,IௐDSSOLFDEOHௐ LVௐ\RXUௐGHDOHUௐQHWZRUNௐLQGHSHQGHQWௐRUௐFRPSDQ\ௐRZQHG"
E
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐDௐPDQXIDFWXUHUௐRUௐ VHUYLFHௐSURYLGHUௐGHVFULEHௐ\RXUௐUHODWLRQVKLSௐZLWKௐ\RXUௐVDOHVௐDQGௐ VHUYLFHௐIRUFHௐDQGௐZLWKௐ\RXUௐGHDOHUௐQHWZRUNௐLQௐGHOLYHULQJௐWKHௐ SURGXFWVௐDQGௐVHUYLFHVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ$UHௐWKHVHௐ
LQGLYLGXDOVௐ\RXUௐHPSOR\HHVௐRUௐWKHௐHPSOR\HHVௐRIௐDௐWKLUGௐSDUW\" $
ௐZHௐDUHௐEHVWௐGHVFULEHGௐDVௐDௐGLVWULEXWRUGHDOHUUHVHOOHUௐDQGௐDOOௐRXUௐZULWWHQௐDXWKRUL]DWLRQௐGRFXPHQWVௐDUHௐDWWDFKHGௐLQௐWKHௐ 5HODWHGௐ&HUWLILFDWHVௐVHFWLRQ


 ,IௐDSSOLFDEOHௐSURYLGHௐDௐGHWDLOHGௐH[SODQDWLRQௐRXWOLQLQJௐWKHௐOLFHQVHVௐ DQGௐFHUWLILFDWLRQVௐWKDWௐDUHௐERWKௐUHTXLUHGௐWRௐEHௐKHOGௐDQGௐDFWXDOO\ௐ KHOGௐE\ௐ\RXUௐRUJDQL]DWLRQௐ
LQFOXGLQJௐWKLUGௐSDUWLHVௐDQGௐ
VXEFRQWUDFWRUVௐWKDWௐ\RXௐXVH
ௐLQௐSXUVXLWௐRIௐWKHௐEXVLQHVVௐ
FRQWHPSODWHGௐE\ௐWKLVௐ5)3
:KDWௐLVௐUHTXLUHGௐGRHVௐYDU\ௐIURPௐVWDWHௐWRௐVWDWHௐKRZHYHUௐZHௐௐ+RXUௐ//&ௐGRௐKROGௐDOOௐDSSOLFDEOHௐOLFHQVHVௐDQGௐ FHUWLILFDWLRQVௐUHTXLUHGௐE\ௐWKHௐ6WDWHௐRIௐ&DOLIRUQLDௐWRௐVHOOௐVHUYLFHௐDQGௐGHOLYHU\ௐ1HZ8QXVHGௐ9HKLFOHVௐZHௐDUHௐIUDQFKLVHGௐIRUௐ DQGௐVHOOௐVHUYLFHௐDQGௐGHOLYHU\ௐDQ\ௐYHKLFOHௐZHௐDUHௐQRWௐIUDQFKLVHGௐIRUௐWKURXJKௐRXUௐUHVHOOHUVௐSHUPLWௐ$OOௐRXUௐGHDOHUௐSDUWQHUVௐ DFURVVௐWKHௐFRXQW\ௐKDYHௐSURYLGHௐXVௐZLWKௐWKHUHௐGHDOHUௐFHUWLILFDWHVௐDQGௐGHSDUWPHQWௐRIௐPRWRUௐYHKLFOHVௐFHUWLILFDWHVௐWRௐDOORZௐ 1$)*ௐWRௐSDUWQHUௐDQGௐVHOOௐWKHUHௐSURGXFWVௐ$OOௐGRFXPHQWVௐDUHௐDWWDFKHGௐLQௐWKHௐ&HUWLILFDWHVௐVHFWLRQ 

 3URYLGHௐDOOௐ³6XVSHQVLRQௐRUௐ'HEDUPHQW´ௐLQIRUPDWLRQௐWKDWௐKDVௐ DSSOLHGௐWRௐ\RXUௐRUJDQL]DWLRQௐGXULQJௐWKHௐSDVWௐWHQௐ\HDUV 1RQHௐH[LVW 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1608
7DEOH
,QGXVWU\5HFRJQLWLRQ 0DUNHWSODFH6XFFHVV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH


'HVFULEHௐDQ\ௐUHOHYDQWௐLQGXVWU\ௐDZDUGVௐRUௐUHFRJQLWLRQௐWKDWௐ\RXUௐ FRPSDQ\ௐKDVௐUHFHLYHGௐLQௐWKHௐSDVWௐILYHௐ\HDUV
1$)*ௐKDVௐDௐVWURQJௐWUDFNௐUHFRUGௐRIௐVXFFHVVௐFRQVLVWHQWO\ௐUDQNLQJௐDPRQJௐWKHௐWRSௐGHDOHUVKLSVௐLQௐ*RYHUQPHQWௐ6DOHVௐIRUௐ )RUGௐ0RWRUௐ&RPSDQ\ௐDQGௐUHFHLYLQJௐKLJKௐUHFRJQLWLRQௐIURPௐ*HQHUDOௐ0RWRUVௐIRUௐLWVௐ&KHYUROHWௐEUDQG 7KHௐPRVWௐSURGLJLRXVௐDZDUGௐ1$)*ௐKDVௐUHFHLYHGௐLQௐWKHௐSDVWௐௐ\HDUVௐZRXOGௐEH ௐ7RSௐ3ODFHPHQWௐLQௐ)RUGௐ0RWRUௐ
&RPSDQ\ௐDVௐDௐOHDGLQJௐGHDOHUVKLSௐLQௐ*RYHUQPHQWௐ6DOHVௐIROORZHGௐE\ௐRXUௐKLJKௐUDQNLQJௐUHFRJQLWLRQௐIURPௐ*HQHUDOௐ0RWRUVௐ IRUௐRXUௐ&KHYUROHWௐEUDQGௐ%RWKௐ1$)*ௐKDVௐUHFHLYHGௐௐRIௐWKHௐSDVWௐௐ\HDUV 

 :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐJRYHUQPHQWDOௐVHFWRUௐLQௐ WKHௐSDVWௐWKUHHௐ\HDUV
,QௐRXUௐGLYLVLRQௐLQௐ)OHHWௐZHௐKDYHௐVROGௐDERXWௐ
ௐWRௐ*RYHUQPHQWௐDFFRXQWV 

 :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐHGXFDWLRQௐVHFWRUௐLQௐWKHௐ SDVWௐWKUHHௐ\HDUV
$VௐDௐSHUFHQWDJHௐRIௐRXUௐVDOHVௐLQௐWKHௐ*RYHUQPHQWௐDERXWௐௐZRXOGௐEHௐFRQVLGHUHGௐWRௐ8QLYHUVLWLHVௐDQGௐ8QLILHGௐ6FKRROௐ 'LVWULFWV 

 /LVWௐDQ\ௐVWDWHௐSURYLQFLDOௐRUௐFRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWVௐWKDWௐ \RXௐKROGௐ
:KDWௐLVௐWKHௐDQQXDOௐVDOHVௐYROXPHௐIRUௐHDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐ WKHௐSDVWௐWKUHHௐ\HDUV"
:HௐKROGௐWKHௐ6WDWHௐRIௐ&DOLIRUQLDௐFRQWUDFWௐZLWKௐYROXPHVௐIURPௐௐWRௐௐXQLWVௐDௐ\HDUௐGXULQJௐWKHௐSDVWௐWKUHHௐ\HDUVௐ 6HFRQGௐRXUௐ6RXUFHZHOOௐ&RQWUDFW
Vௐ
ௐDQGௐ
ௐZKLFKௐRYHUௐWKHௐSDVWௐWKUHHௐ\HDUV
/$':3ௐ&RQWUDFWVௐYDOXHGௐRYHUௐௐ
&LW\ௐRIௐ6DQௐ'LHJRௐ&RQWUDFWVௐYDOXHGௐRYHUௐௐ


 /LVWௐDQ\ௐ*6$ௐFRQWUDFWVௐRUௐ6WDQGLQJௐ2IIHUVௐDQGௐ6XSSO\ௐ $UUDQJHPHQWVௐ
626$
ௐWKDWௐ\RXௐKROGௐ
:KDWௐLVௐWKHௐDQQXDOௐVDOHVௐYROXPHௐIRUௐHDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐ WKHௐSDVWௐWKUHHௐ\HDUV"
1$)*ௐIRFXVௐLVௐRQௐRXUௐ6RXUFHZHOOௐ&RQWUDFWVௐZHௐGRௐQRWௐKROGௐDQ\ௐRWKHUௐEHVLGHVௐWKHௐ6WDWHௐRIௐ &DOLIRUQLD


7DEOH
5HIHUHQFHV7HVWLPRQLDOV
/LQH,WHP6XSSO\UHIHUHQFHLQIRUPDWLRQIURPWKUHHFXVWRPHUVZKRDUHHOLJLEOHWREH6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHV (QWLW\1DPH
&RQWDFW1DPH
3KRQH1XPEHU

3RUWௐRIௐ/RVௐ$QJHOHVௐ
&$
'DYLGௐ&RPHU 
 

/RVௐ$QJHOHVௐ'HSDUWPHQWௐRIௐ:DWHUௐ ௐ3RZHUௐ
&$
3KLOLSௐ/\  

&LW\ௐRIௐ-HUVH\ௐ&LW\ௐ
1-
-DPHVௐ/RYHUR  

:DVKLQJWRQௐ6XEXUEDQௐ6DQLWDU\ௐ&RPPLVVLRQௐ
0DU\ODQG
-DUUHWWௐ%DXPJDUWQHU 
7RZQௐRIௐ+HPSVWHDGௐ
1<
&KULVWRSKHUௐ&DUWHU 
7DEOH
7RS)LYH*RYHUQPHQWRU(GXFDWLRQ&XVWRPHUV
/LQH,WHP3URYLGHDOLVWRI\RXUWRSILYHJRYHUQPHQWHGXFDWLRQRUQRQSURILWFXVWRPHUV HQWLW\QDPHLVRSWLRQDO
LQFOXGLQJHQWLW\W\SHWKHVWDWHRUSURYLQFHWKHHQWLW\LVORFDWHGLQVFRSH RIWKHSURMHFW
V
VL]HRIWUDQVDFWLRQ
V
DQGGROODUYROXPHVIURPWKHSDVWWKUHH\HDUV
(QWLW\1DPH (QWLW\7\SH
6WDWH3URYLQFH
6FRSHRI:RUN
6L]HRI7UDQVDFWLRQV
'ROODU9ROXPH3DVW7KUHH
<HDUV

3RUWௐRIௐ/RVௐ$QJHOHVௐ
0Uௐ'DYLGௐ&RPHU


*RYHUQPHQW &DOLIRUQLD&$ 3URYLGHGௐ1HZௐ9HKLFOHVௐZLWKௐ8SILWV 2YHUௐ 2YHUௐௐ 

/RVௐ$QJHOHVௐ'HSDUWPHQWௐRIௐ
:DWHUௐ ௐ3RZHUௐ
0Uௐ3KLOLSௐ/\ௐ

*RYHUQPHQW &DOLIRUQLD&$ 3URYLGHGௐ1HZௐ9HKLFOHVௐZLWKௐ8SILWV 2YHUௐௐ 2YHUௐௐ 

&LW\ௐRIௐ-HUVH\ௐ&LW\ௐ
0Uௐ-DPHVௐ/RYHURௐ

*RYHUQPHQW 1HZ-HUVH\1- 3URYLGHGௐ1HZௐ9HKLFOHVௐZLWKௐ8SILWV 2YHUௐ 2YHUௐௐ 

:DVKLQJWRQௐ6XEXUEDQௐ
6DQLWDU\ௐ&RPPLVVLRQௐ
0Uௐ-DUUHWWௐ%DXPJDUWQHU

*RYHUQPHQW 0DU\ODQG0' 3URYLGHGௐ1HZௐ9HKLFOHVௐZLWKௐ8SILWV 2YHUௐ 2YHUௐௐ 

(Oௐ3DVRௐ:DWHUௐ
0Uௐ,YDQௐ,EDUUDௐ



*RYHUQPHQW 7H[DV7; 3URYLGHGௐ1HZௐ9HKLFOHVௐZLWKௐ8SILWV 2YHUௐ 2YHUௐௐ 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1609
7DEOH
$ELOLW\WR6HOODQG'HOLYHU6HUYLFH
'HVFULEH\RXUFRPSDQ\¶VFDSDELOLW\WRPHHWWKHQHHGVRI6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHVDFURVVWKH86DQG&DQDGDDVDSSOLFDEOH <RXUUHVSRQVHVKRXOGDGGUHVVLQGHWDLODWOHDVWWKHIROORZLQJDUHDV ORFDWLRQVRI\RXUQHWZRUNRIVDOHVDQGVHUYLFHSURYLGHUVWKHQXPEHURIZRUNHUV IXOOWLPHHTXLYDOHQWV
LQYROYHGLQHDFK
VHFWRUZKHWKHUWKHVHZRUNHUVDUH\RXUGLUHFWHPSOR\HHV RUHPSOR\HHVRIDWKLUGSDUW\
DQGDQ\RYHUODSEHWZHHQWKHVDOHVDQGVHUYLFHIXQFWLRQV /LQH
,WHP 4XHVWLRQ 5HVSRQVH

 6DOHVௐIRUFH 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐERDVWVௐDௐUREXVWௐVDOHVௐIRUFHௐH[FHHGLQJௐௐGHGLFDWHGௐSHUVRQQHOௐ7KLVௐLQFOXGHVௐERWKௐGLUHFWௐ HPSOR\HHVௐDQGௐDௐQHWZRUNௐRIௐSDUWQHUௐGHDOHUVௐHQVXULQJௐFRPSUHKHQVLYHௐVXSSRUWௐIRUௐGHDOHUVKLSVௐDQGௐRXUௐGHGLFDWHGௐIOHHWௐ GLYLVLRQௐ2XUௐLQGLUHFWௐVDOHVௐIRUFHௐVHDPOHVVO\ௐFRPSOHPHQWVௐRXUௐGLUHFWௐWHDPௐHIIHFWLYHO\ௐVHUYLQJௐH[LVWLQJௐPHPEHUௐQHHGVௐ $VௐRXUௐPHPEHUௐEDVHௐH[SDQGVௐZH
UHௐFRPPLWWHGௐWRௐVFDOLQJௐRXUௐWHDPௐDFFRUGLQJO\ௐWRௐPDLQWDLQௐH[FHSWLRQDOௐVHUYLFHௐOHYHOV 

 'HDOHUௐQHWZRUNௐRUௐRWKHUௐGLVWULEXWLRQௐPHWKRGV 1$)*ௐOHYHUDJHVௐDQௐXQSDUDOOHOHGௐIUDQFKLVHௐQHWZRUNௐHQFRPSDVVLQJௐௐOHDGLQJௐPDQXIDFWXUHUVௐ7KHVHௐLQGXVWU\ௐJLDQWVௐOLNHௐ

)RUGௐ0RWRUௐ&RPSDQ\ௐ*HQHUDOௐ0RWRUVௐ&'-5ௐHWF
ௐERDVWௐDௐQDWLRQZLGHௐSUHVHQFHௐHQVXULQJௐRXUௐPHPEHUVௐUHFHLYHௐ VHDPOHVVௐVHUYLFHௐDQGௐZDUUDQW\ௐUHSDLUVௐIRUௐWKHLUௐYHKLFOHVௐ+LVWRULFDOO\ௐDXWRௐPDQXIDFWXUHUVௐKDYHௐIDFHGௐFKDOOHQJHVௐLQௐ GLVWULEXWLQJௐDXWRPRELOHVௐDQGௐFDEௐFKDVVLVௐ+RZHYHUௐWKHௐ8QLWHGௐ6WDWHVௐERDVWVௐWKHௐZRUOG VௐPRVWௐHIILFLHQWௐDXWRPRWLYHௐ
VXSSO\ௐFKDLQௐQHWZRUNௐDQGௐDVௐIUDQFKLVHGௐGHDOHUVௐRIௐWKHVHௐUHQRZQHGௐEUDQGVௐ1$)*ௐFDSLWDOL]HVௐRQௐWKLVௐDGYDQWDJHௐWRௐ HIILFLHQWO\ௐVKLSௐDQGௐVXSSO\ௐYHKLFOHVௐWRௐRXUௐPHPEHUVௐQDWLRQZLGH 

 6HUYLFHௐIRUFH 2XUௐH[WHQVLYHௐQHWZRUNௐRIௐVHUYLFHௐORFDWLRQVௐVSDQQLQJௐWKRXVDQGVௐRIௐIDFLOLWLHVௐDFURVVௐRXUௐௐPDQXIDFWXUHUVௐHQVXUHVௐ FRQYHQLHQWௐDFFHVVௐIRUௐRXUௐPHPEHUVௐ7KLVௐFRPSUHKHQVLYHௐFRYHUDJHௐDOORZVௐWKHPௐWRௐHDVLO\ௐILQGௐVHUYLFHௐVWDWLRQVௐRUௐ ZDUUDQW\ௐUHSDLUௐIDFLOLWLHVௐQHDUE\ௐPLQLPL]LQJௐGRZQWLPHௐDQGௐPD[LPL]LQJௐFRQYHQLHQFHௐ:KLOHௐ$ODVNDௐDQGௐ+DZDLLௐPD\ௐKDYHௐ VOLJKWO\ௐODUJHUௐGLVWDQFHVௐEHWZHHQௐGHDOHUVKLSVௐRXUௐPHPEHUVௐFDQௐVWLOOௐUHO\ௐRQௐRXUௐQHWZRUNௐIRUௐVXSSRUWௐSRWHQWLDOO\ௐZLWKௐ H[WHQGHGௐOHDGௐWLPHV



'HVFULEHௐWKHௐRUGHULQJௐSURFHVVௐ,IௐRUGHUVௐZLOOௐEHௐKDQGOHGௐE\ௐ GLVWULEXWRUVௐGHDOHUVௐRUௐRWKHUVௐH[SODLQௐWKHௐUHVSHFWLYHௐUROHVௐRIௐWKHௐ 3URSRVHUௐDQGௐRWKHUV
0HPEHUVௐFDQௐSODFHௐRUGHUVௐZLWKௐ1$)*ௐIRUௐDOOௐSURGXFWVௐZHௐDUHௐRIIHULQJௐZHௐZLOOௐHLWKHUௐSODFHௐWKHௐRUGHUௐZLWKௐWKHௐ2(0ௐDVௐ ZHௐDUHௐIUDQFKLVHGௐIRUௐRUௐZHௐZLOOௐSURYLGHௐWKHௐRUGHUௐWRௐRXUௐSDUWQHUௐGHDOHUௐZKRௐZDVௐSDUWௐRIௐWKHௐTXRWHௐJHQHUDWLRQௐIURPௐWKHௐ VWDUWௐZLWKௐWKHௐPHPEHUௐVRௐZHௐFDQௐDOORZௐWKHUHௐUHODWLRQVKLSௐWRௐPDLQWDLQௐZKLOHௐVHUYLQJௐWKHௐPHPEHUௐ1$)*ௐPDLQWDLQVௐWKHௐ UROHௐRIௐDGPLQLVWHULQJௐDQGௐIDFLOLWDWLQJௐWKHௐWUDQVDFWLRQௐEHWZHHQௐWKHௐPHPEHUௐDQGௐWKHௐ2(0ௐGHDOHU 

 'HVFULEHௐLQௐGHWDLOௐWKHௐSURFHVVௐDQGௐSURFHGXUHௐRIௐ\RXUௐFXVWRPHU VHUYLFHௐSURJUDPௐLIௐDSSOLFDEOH
,QFOXGHௐ\RXUௐUHVSRQVHWLPHௐFDSDELOLWLHVௐDQGௐFRPPLWPHQWVௐDVௐZHOOௐ DVௐDQ\ௐLQFHQWLYHVௐWKDWௐKHOSௐ\RXUௐSURYLGHUVௐPHHWௐ\RXUௐVWDWHGௐ VHUYLFHௐJRDOVௐRUௐSURPLVHV
,ௐXQGHUVWDQGௐWKDWௐ\RXௐZDQWௐPHௐWRௐXVHௐWKHௐLQIRUPDWLRQௐLQௐ\RXUௐ=,3ௐILOHௐVSHFLILFDOO\ௐWKHௐ0HPEHUௐ:DONௐ7KURXJKௐGRFXPHQWௐ DVௐDௐUHIHUHQFHௐWRௐH[SODLQௐ\RXUௐ&XVWRPHUௐ6HUYLFHௐSURJUDPVௐ+HUH VௐDௐEUHDNGRZQௐEDVHGௐRQௐWKHௐLQIRUPDWLRQௐ\RXௐSURYLGHG

2EWDLQLQJௐ4XRWHVௐ2QOLQH

Ɣௐௐௐௐ0HPEHUVௐFDQௐUHJLVWHUௐRQௐRXUௐZHEVLWHௐ
KWWSV
ZZZQDWLRQDODXWRIOHHWJURXSFRP
ௐIRUௐIUHHௐ7KLVௐSURWHFWVௐPHPEHUௐ
SULFLQJ
Ɣௐௐௐௐ$IWHUௐUHJLVWUDWLRQௐWKH\
OOௐUHFHLYHௐDௐZHOFRPHௐHPDLOௐZLWKௐDௐGHPRௐYLGHRௐH[SODLQLQJௐWKHௐZHEVLWH Ɣௐௐௐௐ$ௐVHFXUHௐGDVKERDUGௐNHHSVௐDOOௐTXRWHVௐRUJDQL]HG
Ɣௐௐௐௐ0HPEHUVௐFKRRVHௐWKHLUௐGHVLUHGௐEUDQGௐPRGHOௐ\HDUௐDQGௐFDWHJRU\ௐ FDUVௐYDQVௐHWF

Ɣௐௐௐௐ)LOWHUVௐKHOSௐQDUURZௐGRZQௐRSWLRQVௐ
FDEௐVW\OHௐGULYHWUDLQௐEHGௐOHQJWK

Ɣௐௐௐௐ$OOௐDYDLODEOHௐIDFWRU\ௐRSWLRQVௐDUHௐGLVSOD\HGௐIRUௐHDV\ௐVHOHFWLRQ Ɣௐௐௐௐ6RXUFHZHOOௐ3ULFHௐUHSRUWVௐVKRZௐ0653ௐPHPEHUௐSULFHௐDQGௐVDYLQJVௐ SHUFHQWDJHௐDQGௐGROODUௐDPRXQW

Ɣௐௐௐௐ2SWLRQDOௐH[WUDVௐLQFOXGHௐDGGLWLRQDOௐNH\VௐPDQXDOVௐVDOHVௐWD[ௐDQGௐXSILWV Ɣௐௐௐௐ$ௐILQDOௐSULQWDEOHௐTXRWHௐSDFNDJHௐLQFOXGHVௐDௐXQLTXHௐ6RXUFHZHOOௐ4XRWHௐ,'ௐQXPEHUௐGHVFULSWLRQௐDQGௐVSHFLILFDWLRQV 3DUWQHULQJௐZLWKௐ8SILWWHUV

Ɣௐௐௐௐ$ௐGHGLFDWHGௐZHEVLWHௐ
KWWSV
ZZZQDWLRQDODXWRIOHHWJURXSFRP
ௐFRQQHFWVௐPHPEHUVௐZLWKௐXSILWWHUV
Ɣௐௐௐௐ8SILWWHUVௐFDQௐOHDUQௐDERXWௐSDUWQHULQJௐZLWKௐ1$)*ௐWRௐVHUYHௐORFDOௐPHPEHUV Ɣௐௐௐௐ7KLVௐVLPSOLILHVௐWKHௐSURFHVVௐRIௐJHWWLQJௐDௐYHKLFOHௐXSILWWHG 7UDFNLQJௐ2UGHUV

Ɣௐௐௐௐ0HPEHUVௐFDQௐWUDFNௐRUGHUVௐGLUHFWO\ௐRQௐWKHௐPDLQௐZHEVLWHௐXVLQJௐWKHௐ7UDFNௐ\RXUௐRUGHUௐIHDWXUH Ɣௐௐௐௐ2UGHUVௐFDQௐEHௐWUDFNHGௐE\ௐHQWHULQJௐWKHௐSXUFKDVHௐRUGHUௐQXPEHUௐTXRWHௐ,'ௐXSILWௐTXRWHௐ,'ௐRUௐ9,1 2UGHUௐ&RQILUPDWLRQ

Ɣௐௐௐௐ1$)*ௐVHQGVௐDௐFRXUWHV\ௐFRQILUPDWLRQௐHPDLOௐWRௐGRXEOHFKHFNௐRUGHUௐGHWDLOVௐ FRORUௐTXDQWLW\ௐXSILWௐVSHFLILFDWLRQV

Ɣௐௐௐௐ7LWOHௐLQIRUPDWLRQௐLVௐUHTXHVWHGௐWRௐH[SHGLWHௐSDSHUZRUNௐDWௐGHOLYHU\ )DFWRU\ௐ2UGHUௐ&XW2IIௐ1RWLFHV

Ɣௐௐௐௐ7KHௐZHEVLWHௐKLJKOLJKWVௐXSFRPLQJௐIDFWRU\ௐRUGHUௐFXWRIIௐGDWHV Ɣௐௐௐௐ7KLVௐLQIRUPDWLRQௐLVௐDOVRௐSULQWHGௐRQௐWKHௐTXRWHௐFRYHUௐSDJHௐ ZKHQௐDYDLODEOH

3ULFHௐ9DOLGDWLRQௐ([DPSOH

Ɣௐௐௐௐ$ௐVDPSOHௐEXLOGௐSURFHVVௐVKRZFDVHVௐPHPEHUௐSULFLQJௐEHQHILWV Ɣௐௐௐௐ7KHௐH[DPSOHௐVKRZVௐWKHௐGLIIHUHQFHௐEHWZHHQௐ0653ௐPHPEHUௐSULFHௐDQGௐWRWDOௐVDYLQJVௐ SHUFHQWDJHௐDQGௐGROODUௐ
DPRXQW
ௐ
3URYLGHௐDQௐH[DPSOHௐZLWKௐVDYLQJVௐ

Ɣௐௐௐௐ7KLVௐHPSKDVL]HVௐWKHௐDGGLWLRQDOௐGLVFRXQWௐRIIHUHGௐE\ௐ1$)* 

 'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐSURYLGHௐ\RXUௐSURGXFWVௐ DQGௐVHUYLFHVௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHௐ8QLWHG 6WDWHV
:HௐKDYHௐSURYLGHGௐDௐOLVWௐRIௐRXUௐWRSௐௐPHPEHUFOLHQWVௐGHPRQVWUDWLQJௐRXUௐDELOLW\ௐWRௐVHUYLFHௐDOOௐPHPEHUVௐQDWLRQZLGHௐ /RFDWHGௐLQௐWKHௐ0DUNHWLQJௐ3ODFHௐ=,3ௐILOHௐDVௐ³1$)*ௐ7RSௐௐ0HPEHUௐ&OLHQWV´ௐ3') 

 'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐSURYLGHௐ\RXUௐSURGXFWVௐ DQGௐVHUYLFHVௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐ&DQDGD 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐLVௐSRLVHGௐWRௐH[SDQGௐLQWRௐ&DQDGDௐOHYHUDJLQJௐRXUௐSURYHQௐEXVLQHVVௐPRGHOௐDQGௐH[SHUWLVHௐ:Hௐ EHOLHYHௐWKHௐIDYRUDEOHௐH[FKDQJHௐUDWHௐDQGௐRXUௐFRPSHWLWLYHௐSULFLQJௐVWUXFWXUHௐFUHDWHௐDQௐLGHDOௐRSSRUWXQLW\ௐWRௐSDUWQHUௐZLWKௐ &DQDGLDQௐGHDOHUௐJURXSVௐXOWLPDWHO\ௐVHUYLQJௐPHPEHUVௐDFURVVௐ1RUWKௐ$PHULFD 

 ,GHQWLI\ௐDQ\ௐJHRJUDSKLFௐDUHDVௐRIௐWKHௐ8QLWHGௐ6WDWHVௐRUௐ&DQDGDௐ WKDWௐ\RXௐZLOOௐ127ௐEHௐIXOO\ௐVHUYLQJௐWKURXJKௐWKHௐSURSRVHGௐFRQWUDFW :HௐDUHௐQRWௐVHUYLQJௐ&DQDGDௐDWௐWKLVௐPRPHQW 

 ,GHQWLI\ௐDQ\ௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐVHFWRUVௐ LHௐ
JRYHUQPHQWௐHGXFDWLRQௐQRWIRUSURILW
ௐWKDWௐ\RXௐZLOOௐ127ௐEHௐIXOO\ௐ
VHUYLQJௐWKURXJKௐWKHௐSURSRVHGௐFRQWUDFW
([SODLQௐLQௐGHWDLOௐ)RUௐH[DPSOHௐGRHVௐ\RXUௐFRPSDQ\ௐKDYHௐRQO\ௐDௐ UHJLRQDOௐSUHVHQFHௐRUௐGRௐRWKHUௐFRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWV OLPLWௐ\RXUௐDELOLW\ௐWRௐSURPRWHௐDQRWKHUௐFRQWUDFW"
:H
UHௐKDSS\ௐWRௐVHUYLFHௐDOOௐ6RXUFHZHOOௐPHPEHUVௐWKURXJKௐRXUௐௐZHEVLWHௐ:HௐRIIHUௐJRYHUQPHQWௐPHPEHUVௐDௐVSHFLILFௐ GLVFRXQWௐSURJUDPௐLQௐUHFRJQLWLRQௐRIௐWKHLUௐXVHௐRIௐWD[SD\HUௐIXQGV )RUௐQRQSURILWௐRUJDQL]DWLRQVௐZH
YHௐGHVLJQHGௐDௐWDLORUHGௐSULFLQJௐSURJUDPௐWRௐPHHWௐWKHLUௐXQLTXHௐQHHGVௐDQGௐEXGJHWVௐ:H OOௐ
ZRUNௐZLWKௐHDFKௐQRQSURILWௐRQௐDௐFDVHE\FDVHௐEDVLVௐWRௐHQVXUHௐWKH\ௐUHFHLYHௐWKHௐPRVWௐYDOXHௐIURPௐRXUௐVHUYLFHV 

 'HILQHௐDQ\ௐVSHFLILFௐFRQWUDFWௐUHTXLUHPHQWVௐRUௐUHVWULFWLRQVௐWKDWௐ ZRXOGௐDSSO\ௐWRௐRXUௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐ+DZDLLௐDQGௐ$ODVNDௐ DQGௐLQௐ86ௐ7HUULWRULHV
)RUௐPHPEHUVௐLQௐ$ODVNDௐ+DZDLLௐDQGௐ86ௐ7HUULWRULHVௐWKHௐRQO\ௐPHPEHUVKLSௐUHTXLUHPHQWௐLVௐWKHௐVDPHௐDVௐIRUௐDOOௐRWKHUௐ PHPEHUVௐ+RZHYHUௐGXHௐWRௐORJLVWLFDOௐVKLSSLQJௐFRQVWUDLQWVௐLQௐWKHVHௐUHJLRQVௐDGGLWLRQDOௐFRVWVௐPD\ௐDSSO\ :HௐFXUUHQWO\ௐSURYLGHௐPHPEHUVௐLQௐ$ODVNDௐZLWKௐFKDVVLVௐFDEVௐZLWKௐXSILWVௐ,QௐWKHVHௐFDVHVௐWKHௐPHPEHUௐDJUHHVௐWRௐFRYHUௐWKHௐ H[WUDௐVKLSSLQJௐFRVWௐSRUWௐFRVWௐDQGௐGULYHUௐFRVWௐDVVRFLDWHGௐZLWKௐORDGLQJௐDQGௐXQORDGLQJௐWKHLUௐYHKLFOHVௐIURPௐSRUWௐWRௐSRUWௐ 7KLVௐDGGLWLRQDOௐFRVWௐZRXOGௐEHௐFOHDUO\ௐRXWOLQHGௐLQௐDQ\ௐTXRWHௐSURYLGHGௐWRௐPHPEHUVௐLQௐWKHVHௐUHJLRQV 

7DEOH
0DUNHWLQJ3ODQ
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1610
 'HVFULEHௐ\RXUௐPDUNHWLQJௐVWUDWHJ\ௐIRUௐSURPRWLQJௐWKLVௐFRQWUDFWௐ RSSRUWXQLW\ௐௐ8SORDGௐUHSUHVHQWDWLYHௐVDPSOHVௐRIௐ\RXUௐPDUNHWLQJௐ PDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐXWLOL]HVௐDௐQXPEHUௐRIௐRXWERXQGௐVWUDWHJLHVௐWRௐSURPRWHௐWKHௐ6RXUFHZHOOௐ9HKLFOHௐFRQWUDFWௐ1DWLRQDOௐ $XWRௐ)OHHWௐ*URXSௐLVQ¶WௐZDLWLQJௐIRUௐJRYHUQPHQWௐDJHQFLHVௐWRௐFRPHௐNQRFNLQJௐDERXWௐWKHௐ6RXUFHZHOOௐ9HKLFOHௐFRQWUDFWௐௐ ,QVWHDGௐZH¶UHௐSURDFWLYHO\ௐKLWWLQJௐWKHௐJDVௐSHGDOௐZLWKௐRXWERXQGௐPDUNHWLQJௐVWUDWHJLHV :LWKௐRXWERXQGௐPDUNHWLQJௐ1$)*ௐLQLWLDWHVௐE\ௐSXVKLQJௐWKHௐPHVVDJHௐRXWௐWRௐRXUௐJRYHUQPHQWௐDJHQFLHVௐௐௐ ([DPSOHVௐLQFOXGH
ௐௐௐ
Ɣௐௐௐௐ&ROGௐ(PDLOௐ&DPSDLJQV
ௐ7DLORUHGௐPHVVDJHVௐUHDFKLQJௐUHOHYDQWௐJRYHUQPHQWௐDJHQFLHVௐGLUHFWO\ௐ([DPSOHVௐLQFOXGHௐQHZௐ YHKLFOHௐSULFLQJௐDYDLODELOLW\ௐLQௐVWRFNௐXQLWVௐQHZௐZHEVLWHௐIHDWXUHVௐKROLGD\ௐWKHPHGௐIO\HUVௐDQGௐYHKLFOHௐFXWRIIௐGDWHV Ɣௐௐௐௐ7UDGHௐ6KRZௐ3UHVHQFH
ௐ(QJDJLQJௐH[KLELWVௐDQGௐNQRZOHGJHDEOHௐUHSUHVHQWDWLYHVௐPDNLQJௐFRQQHFWLRQVௐDWௐNH\ௐHYHQWV Ɣௐௐௐௐ7DUJHWHGௐ&RQWHQW
ௐ&UHDWLQJௐGLYHUVHௐFDPSDLJQௐPDWHULDOVௐWKDWௐUHVRQDWHௐZLWKௐGLIIHUHQWௐJRYHUQPHQWௐVHJPHQWVௐ)RUௐ H[DPSOHௐSROLFHௐYHKLFOHௐDYDLODELOLW\ௐIO\HUVௐIRUௐSROLFHௐDJHQFLHV Ɣௐௐௐௐ'DWD'ULYHQௐ'HFLVLRQV
ௐ7UDFNLQJௐUHVXOWVௐDQGௐRSWLPL]LQJௐFDPSDLJQVௐIRUௐPD[LPXPௐLPSDFWௐVXFKௐDVௐRSHQௐUDWHVௐFOLFN WKURXJKௐUDWHVௐWRௐJDXJHௐWKHௐHIIHFWLYHQHVVௐRIௐRXUௐHPDLOௐFDPSDLJQV 2XUௐXVHௐRIௐ&DPSDLJQHUௐ(PDLOௐ0DUNHWLQJௐSODWIRUPௐVHUYLFHௐLVௐDௐ&50ௐGDWDEDVHௐXVHGௐWRௐPRQLWRUௐVHQGௐDQGௐWUDFNௐ HIIHFWLYHQHVVௐRIௐHPDLOVௐDQGௐPRUHௐௐ7KLVௐVHUYLFHௐKDVௐDVVLVWHGௐLQௐVWUHDPOLQLQJௐHPDLOௐIO\HUௐPHVVDJHVௐWRௐPDQ\ௐRIௐRXUௐ JRYHUQPHQWௐDJHQFLHVௐDFURVVௐWKHௐ8QLWHGௐ6WDWHVௐௐ&DPSDLJQHUௐKDVௐEHHQௐDQௐHVVHQWLDOௐWRROௐLQௐQRWௐRQO\ௐFUHDWLQJௐQHZௐ FDPSDLJQVௐEXWௐUHFXUULQJௐFDPSDLJQVௐWRௐHQVXUHௐRXUௐPHVVDJHௐLVௐVHQWௐWRௐQHZௐSRWHQWLDOௐFOLHQWVௐௐ 7KLVௐW\SHௐRIௐRXWERXQGௐPDUNHWLQJௐIRVWHUVௐSURDFWLYHௐHQJDJHPHQWௐZLWKௐSRWHQWLDOௐFXVWRPHUVௐVSDUNLQJௐWKHLUௐLQWHUHVWௐLQௐRXUௐ SURGXFWVௐ:HௐLQYLWHௐWKHPௐWRௐH[SORUHௐWKHௐGLYHUVHௐSURGXFWௐUDQJHௐVKRZFDVHGௐRQௐRXUௐ1$)*ௐZHEVLWHௐFRQYHQLHQWO\ௐ DFFHVVLEOHௐWKURXJKௐERWKௐSKRQHௐFDOOVௐDQGௐZHEVLWHௐYLVLWVௐ 7RௐIXUWKHUௐHPSRZHUௐWKHLUௐEX\LQJௐMRXUQH\ௐZHௐHQFRXUDJHௐUHJLVWUDWLRQௐ,WௐQRWௐRQO\ௐXQORFNVௐUHDOWLPHௐSURGXFWௐDYDLODELOLW\ௐEXWௐ DOVRௐJUDQWVௐDFFHVVௐWRௐRXUௐLQQRYDWLYHௐVHOITXRWLQJௐV\VWHPௐ7KLVௐLQWXLWLYHௐWRROௐHPSRZHUVௐFXVWRPHUVௐZLWKௐWKHௐDXWRQRP\ௐWRௐ FUHDWHௐXQOLPLWHGௐSHUVRQDOL]HGௐTXRWHVௐWDLORULQJௐWKHPௐWRௐWKHLUௐVSHFLILFௐQHHGVௐDQGௐEXGJHWௐ%\ௐHOLPLQDWLQJௐWKHௐZDLWௐIRUௐ WUDGLWLRQDOௐTXRWHVௐWKLVௐVHOIVHUYLFHௐRSWLRQௐVWUHDPOLQHVௐWKHௐSURFHVVௐIRVWHULQJௐDௐVHQVHௐRIௐFRQWUROௐDQGௐRZQHUVKLSௐIRUௐWKHௐ FXVWRPHUௐ8OWLPDWHO\ௐWKLVௐRXWERXQGௐPDUNHWLQJௐDSSURDFKௐFRXSOHGௐZLWKௐRXUௐXVHUIULHQGO\ௐVHOITXRWLQJௐV\VWHPௐHPSRZHUVௐ SRWHQWLDOௐFXVWRPHUVௐWRௐFRQILGHQWO\ௐH[SORUHௐDQGௐFRQILGHQWO\ௐPDNHௐLQIRUPHGௐGHFLVLRQV %XVLQHVVௐWRௐ%XVLQHVVௐ0DUNHWLQJ
ௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS
1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐ
1$)*
ௐDFNQRZOHGJHVௐWKHௐLPSRUWDQFHௐRIௐEXLOGLQJௐVWURQJௐUHODWLRQVKLSVௐZLWKௐORFDOௐXSILWWLQJௐERG\ௐ FRPSDQLHVௐ7KDW
VௐZK\ௐZHௐHPSOR\ௐVWUDWHJLFௐEXVLQHVVWREXVLQHVVௐ
%%
ௐPDUNHWLQJௐVWUDWHJLHVௐWRௐDWWUDFWௐSRWHQWLDOௐSDUWQHUVௐ
DQGௐFUHDWHௐDௐPXWXDOO\ௐEHQHILFLDOௐHFRV\VWHP
,QWURGXFLQJௐ2XUௐ3DUWQHUௐ:HEVLWH

:HௐHQFRXUDJHௐDQ\ௐERG\ௐXSILWWLQJௐFRPSDQ\ௐWRௐYLVLWௐRXUௐGHGLFDWHGௐSDUWQHUௐZHEVLWH ௐZZZQDIJSDUWQHUFRPௐ7KLVௐSODWIRUPௐ
PDNHVௐLWௐHDV\ௐIRUௐORFDOௐXSILWWLQJௐFRPSDQLHVௐWRௐH[SORUHௐWKHௐEHQHILWVௐRIௐFROODERUDWLQJௐZLWKௐ1$)* .H\ௐ3HUNVௐIRUௐ8SILWWLQJௐ%RG\ௐ&RPSDQLHV

Ɣௐௐௐௐ(QKDQFHGௐ9LVLELOLW\
ௐ*HWௐWKHௐERG\ௐFRPSDQ\¶VௐFRPSDQ\ௐSURILOHௐOLVWHGௐRQௐRXUௐZHEVLWHௐPDNLQJௐWKHPௐVHDUFKDEOHௐE\ௐ 1$)*
VௐH[WHQVLYHௐQHWZRUNௐRIௐJRYHUQPHQWௐFOLHQWV
Ɣௐௐௐௐ7DUJHWHGௐUHIHUUDOV
ௐ:HௐDFWLYHO\ௐFRQQHFWௐXSILWWLQJௐFRPSDQLHVௐZLWKௐTXDOLILHGௐJRYHUQPHQWௐFOLHQWVௐVHHNLQJௐWKHLUௐVSHFLILFௐ H[SHUWLVH
Ɣௐௐௐௐ3URILOHௐ&XVWRPL]DWLRQ
ௐ3DUWQHUVௐDUHௐHQFRXUDJHGௐWRௐFUHDWHௐDௐXQLTXHௐSURILOHௐVKRZFDVLQJௐWKHௐERG\ௐFRPSDQ\ Vௐ
VWUHQJWKVௐH[SHULHQFHௐDQGௐVHUYLFHௐRIIHULQJV
Ɣௐௐௐௐ*HRJUDSKLFௐ5HDFK
ௐ([SDQGௐWKHௐQHWZRUNௐE\ௐKDYLQJௐRXUௐSDUWQHUV¶ௐFRQWDFWௐLQIRUPDWLRQௐDQGௐORFDWLRQௐGLVSOD\HGௐRQௐRXUௐ LQWHUDFWLYHௐPDS
%\ௐSDUWQHULQJௐZLWKௐ1$)*ௐERG\ௐFRPSDQLHVௐJDLQௐDFFHVVௐWRௐDௐYDVWௐSRROௐRIௐSRWHQWLDOௐJRYHUQPHQWௐFOLHQWVௐVHHNLQJௐYHKLFOHௐ XSILWWLQJௐVHUYLFHVௐ,QௐWXUQௐWKHௐERG\ௐFRPSDQ\ௐKHOSVௐXVௐIXOILOOௐFOLHQWௐQHHGVௐDQGௐGHOLYHUௐFRPSUHKHQVLYHௐYHKLFOHௐVROXWLRQV 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐDOVRௐH[HUFLVHVௐWKHௐXVHௐRIௐLQERXQGௐPDUNHWLQJௐVWUDWHJLHVௐWRௐSURPRWHௐRXUௐ6RXUFHZHOOௐ9HKLFOHௐ FRQWUDFWௐௐ
ௐ2XUௐPDUNHWLQJௐGHSDUWPHQWௐFXOWLYDWHVௐDௐWDUJHWHGௐDXGLHQFHௐE\ௐPDLQWDLQLQJௐDௐGDWDEDVHௐRIௐUHJLVWHUHGௐJRYHUQPHQWௐ DJHQFLHVௐRQௐRXUௐZHEVLWHௐDQGௐQXUWXULQJௐSDVWௐFXVWRPHUVௐZKRௐKDYHௐH[SHULHQFHGௐWKHௐEHQHILWVௐRIௐRXUௐRIIHULQJVௐ7KLVௐDOORZVௐ XVௐWRௐGHOLYHUௐUHOHYDQWௐFRQWHQWௐDQGௐUHVRXUFHVௐGLUHFWO\ௐWRௐWKRVHௐDOUHDG\ௐLQWHUHVWHGௐLQௐRXUௐVROXWLRQVௐIRVWHULQJௐWUXVWௐDQGௐ EUDQGௐOR\DOW\ௐ
5HODWLRQVKLSௐEXLOGLQJௐLVௐDQRWKHUௐWHFKQLTXHௐXVHGௐWRௐIRVWHUௐSRVLWLYHௐUHODWLRQVௐZLWKௐFOLHQWVௐWRௐEHFRPHௐORQJWHUPௐFXVWRPHUVௐௐ 1$)*ௐWHDPௐSURYLGHVௐH[FHOOHQWௐFXVWRPHUௐVHUYLFHௐDQGௐVXSSRUWௐWRௐHQFRXUDJHௐZRUGௐRIௐPRXWKௐUHIHUUDOௐ7KHௐSRVLWLYHௐTXDOLW\ௐ RIௐVHUYLFHௐH[SHULHQFHGௐE\ௐFXVWRPHUVௐKDVௐOHGௐWRௐDQௐLQFUHDVHGௐQXPEHUௐRIௐVDOHVௐWKURXJKௐUHIHUUDOVௐௐ2XUௐJRDOௐLVௐWRௐ SURYLGHௐH[HPSODU\ௐFXVWRPHUௐVHUYLFHௐWKURXJKRXWௐWKHௐHQWLUHௐSXUFKDVLQJௐSURFHVVௐWRௐHQFRXUDJHௐUHSHDWௐEXVLQHVVௐDQGௐUHIHUUDOV 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1611
 'HVFULEHௐ\RXUௐXVHௐRIௐWHFKQRORJ\ௐDQGௐGLJLWDOௐGDWDௐ
HJௐVRFLDOௐ
PHGLDௐPHWDGDWDௐXVDJH
ௐWRௐHQKDQFHௐPDUNHWLQJௐHIIHFWLYHQHVV
7KHௐFUHDWLRQௐRIௐWKHௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐDSSௐLVௐRQHௐZD\ௐWRௐEXLOGௐDௐVWURQJHUௐUHODWLRQVKLSௐZLWKௐLQWHUHVWHGௐEX\HUVௐ DQGௐHPSRZHUௐWKHPௐZLWKௐWKHௐLQIRUPDWLRQௐWKH\ௐQHHGௐ%\ௐGRZQORDGLQJௐRXUௐ1$)*ௐDSSௐFOLHQWVௐDUHௐDEOHௐWR

Ɣௐௐௐௐ5HFHLYHௐLQVWDQWௐSXVKௐQRWLILFDWLRQVௐRQௐWKHLUௐSKRQHVௐUHJDUGLQJௐQHZௐYHKLFOHௐDYDLODELOLW\ ௐ%HௐWKHௐILUVWௐWRௐNQRZௐZKHQௐ
QHZௐYHKLFOHVௐDUULYHௐRQௐWKHௐORWௐWKDWௐPDWFKௐ\RXUௐVSHFLILFௐQHHGVௐDQGௐSUHIHUHQFHV Ɣௐௐௐௐ6WD\ௐLQIRUPHGௐDERXWௐFUXFLDOௐFXWRIIௐGDWHV
ௐ(QVXUHௐFOLHQWVௐGRQ
WௐPLVVௐRXWௐRQௐௐGHDGOLQHVௐE\ௐKDYLQJௐWKHPௐFRQYHQLHQWO\ௐ
GHOLYHUHGௐVWUDLJKWௐWRௐ\RXUௐSKRQH
Ɣௐௐௐௐ9LHZௐ$YDLODEOHௐ,Q6WRFNௐ8QLWV
ௐ6FUROOௐWKURXJKௐDௐOLVWௐRIௐLQௐVWRFNௐYHKLFOHVௐDYDLODEOHௐRQௐRXUௐZHEVLWHௐ $ௐVSHFLILFௐLQERXQGௐPDUNHWLQJௐWDFWLFௐWKDWௐFDQௐVLJQLILFDQWO\ௐERRVWௐRXUௐRQOLQHௐSUHVHQFHௐLVௐWKHௐGHYHORSPHQWௐRIௐVHDUFKௐ HQJLQHௐRSWLPL]DWLRQௐ
6(2
ௐ%\ௐRSWLPL]LQJௐRXUௐZHEVLWHௐIRUௐUHOHYDQWௐNH\ZRUGVௐDQGௐXVHUௐH[SHULHQFHௐZHௐFDQௐDWWUDFWௐPRUHௐ TXDOLILHGௐYLVLWRUVௐRUJDQLFDOO\ௐDQGௐHVWDEOLVKௐ1$)*ௐDVௐDௐOHDGLQJௐQDPHௐLQௐLWVௐILHOG +HUH
VௐKRZௐZH
UHௐDFWLYHO\ௐLPSOHPHQWLQJௐ6(2ௐRQௐWKHௐ1$)*ௐZHEVLWH

5HZULWLQJௐWKHௐ1$)*ௐ6WRU\

Ɣௐௐௐௐ%\ௐFUDIWLQJௐDௐFRPSHOOLQJௐDQGௐLQIRUPDWLYHௐZHESDJHௐWKDWௐFOHDUO\ௐGHILQHVௐZKRௐZHௐDUHௐZKDWௐZHௐGRௐDQGௐKRZௐZHௐ EHQHILWௐRXUௐDXGLHQFH
Ɣௐௐௐௐ,QFOXGHGௐUHOHYDQWௐNH\ZRUGVௐQDWXUDOO\ௐWKURXJKRXWௐWKHௐFRQWHQWௐLQFOXGLQJௐSURGXFWௐQDPHVௐPLVVLRQௐVWDWHPHQWௐDQGௐ FRQWUDFWௐQXPEHUV
Ɣௐௐௐௐ(QVXUHGௐWKHௐSDJHௐLVௐFRQFLVHௐDQGௐVFDQQDEOHௐEUHDNLQJௐXSௐWH[WௐZLWKௐKHDGLQJVௐDQGௐEXOOHWௐSRLQWV ௐ2Q3DJHௐ2SWLPL]DWLRQௐ7HFKQLTXHV

Ɣௐௐௐௐ7LWOHௐWDJV
ௐ(DFKௐSDJHௐLQFOXGHVௐDௐXQLTXHௐDQGௐGHVFULSWLYHௐWLWOHௐWDJௐXQGHUௐௐFKDUDFWHUVௐWKDWௐDFFXUDWHO\ௐUHIOHFWVௐWKHௐ FRQWHQWௐDQGௐLQFOXGHVௐUHOHYDQWௐNH\ZRUGV
Ɣௐௐௐௐ0HWDௐGHVFULSWLRQV
ௐ&UDIWLQJௐFDSWLYDWLQJௐPHWDௐGHVFULSWLRQVௐ
XQGHUௐௐFKDUDFWHUV
ௐWKDWௐHQWLFHௐXVHUVௐWRௐFOLFNௐDQGௐ
VXPPDUL]HௐWKHௐSDJH
VௐYDOXHௐSURSRVLWLRQ
Ɣௐௐௐௐ+HDGHUௐWDJV
ௐ6WUXFWXUHGௐWKHௐFRQWHQWௐZLWKௐFOHDUௐKHDGLQJVௐDQGௐVXEKHDGLQJVௐ +ௐ+ௐHWF
ௐWRௐLPSURYHௐUHDGDELOLW\ௐ
DQGௐVHDUFKௐHQJLQHௐFUDZODELOLW\
Ɣௐௐௐௐ,PDJHV
ௐ2SWLPL]HௐLPDJHௐILOHௐQDPHVௐDQGௐDOWௐWH[WௐZLWKௐUHOHYDQWௐNH\ZRUGVௐWRௐLQFUHDVHௐDFFHVVLELOLW\ௐDQGௐLPDJHௐVHDUFKௐ UDQNLQJ
Ɣௐௐௐௐ,QWHUQDOௐOLQNLQJ
ௐ&RQQHFWLQJௐUHODWHGௐSDJHVௐZLWKLQௐWKHௐZHEVLWHௐXVLQJௐGHVFULSWLYHௐDQFKRUௐWH[W Ɣௐௐௐௐ6RFLDOௐPHGLD
ௐ(QVXUHௐVRFLDOௐPHGLDௐSURILOHVௐDQGௐVKDUHௐEXWWRQVௐDUHௐOLQNHGௐWRௐRXUௐSDJHVௐ %\ௐLPSOHPHQWLQJௐWKHVHௐDFWLRQDEOHௐ6(2ௐVWUDWHJLHVௐZHௐFDQௐVLJQLILFDQWO\ௐLPSURYHௐ1$)* VௐRQOLQHௐSUHVHQFHௐDWWUDFWௐPRUHௐ
TXDOLILHGௐOHDGVௐDQGௐHVWDEOLVKௐRXUVHOYHVௐDVௐDௐWKRXJKWௐOHDGHUௐLQௐWKHௐLQGXVWU\ :KHQௐWKHௐWHUPVௐ³JRYHUQPHQWௐIOHHWௐYHKLFOHௐSXUFKDVLQJ´ௐ³SXUFKDVLQJௐYHKLFOHVௐIRUௐWKHௐJRYHUQPHQW´ௐ³JRYHUQPHQWௐYHKLFOHௐ SXUFKDVLQJ´ௐ³KRZௐGRௐ,ௐSXUFKDVHௐYHKLFOHVௐIRUௐWKHௐJRYHUQPHQW´ௐ³SXUFKDVLQJௐJRYHUQPHQWௐIOHHW´ௐ³JRYHUQPHQWௐYHKLFOHௐ SURFXUHPHQW´ௐ³SURFXULQJௐYHKLFOHVௐIRUௐWKHௐJRYHUQPHQW´DUHௐHQWHUHGௐLQௐWKHௐJRRJOHௐVHDUFKௐEXWWRQௐ1$)*ௐLVௐRQௐWKHௐWRSௐILYHௐ VHDUFKௐUHVXOWVௐ
6RFLDOௐPHGLDௐLVௐDௐFULWLFDOௐSDUWௐLQௐWKHௐZD\ௐSHRSOHௐFRPPXQLFDWHௐDQGௐFRQQHFWௐZLWKௐHDFKௐRWKHUௐௐ/LQNHGLQௐRIIHUVௐDௐYDULHW\ௐ RIௐZD\VௐWRௐH[SDQGௐRXUௐQHWZRUNௐE\ௐILQGLQJௐDQGௐFRQQHFWLQJௐZLWKௐUHOHYDQWௐSURIHVVLRQDOVௐLQௐWKHௐLQGXVWU\ௐ3ODWIRUPVௐOLNHௐ /LQNHG,QௐRIIHUௐLQYDOXDEOHௐWRROVௐIRUௐSURIHVVLRQDOௐQHWZRUNLQJௐDOORZLQJௐLQGLYLGXDOVௐWRௐH[SDQGௐWKHLUௐQHWZRUNௐE\ௐILQGLQJௐDQGௐ FRQQHFWLQJௐZLWKௐUHOHYDQWௐSURIHVVLRQDOVௐDQGௐLQGXVWU\ௐOHDGHUVௐ $ௐSULPHௐH[DPSOHௐLVௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐZKLFKௐHIIHFWLYHO\ௐXWLOL]HVௐ/LQNHG,QௐWRௐUHDFKௐRXWௐWRௐFXUUHQWௐDQGௐSRWHQWLDOௐ PHPEHUVௐWKURXJKௐSHUVRQDOL]HGௐPHVVDJHVௐIRVWHULQJௐVWURQJHUௐUHODWLRQVKLSVௐDQGௐFRPPXQLW\ௐHQJDJHPHQW %H\RQGௐSURIHVVLRQDOௐFRQQHFWLRQVௐVRFLDOௐPHGLDௐVHUYHVௐDVௐDௐSRZHUIXOௐEULGJHௐEHWZHHQௐLQGLYLGXDOVௐDQGௐWKHLUௐJRYHUQLQJௐ ERGLHVௐ%\ௐIROORZLQJௐJRYHUQPHQWௐSDJHVௐRQௐ,QVWDJUDPௐDQGௐ7ZLWWHUௐJRYHUQPHQWௐPXQLFLSDOLWLHVௐFDQௐJDLQௐYDOXDEOHௐLQVLJKWVௐ LQWRௐSUHVVLQJௐLVVXHVௐDQGௐLPSRUWDQWௐDQQRXQFHPHQWV


 ,Qௐ\RXUௐYLHZௐZKDWௐLVௐ6RXUFHZHOO¶VௐUROHௐLQௐSURPRWLQJௐFRQWUDFWVௐ DULVLQJௐRXWௐRIௐWKLVௐ5)3"ௐ
+RZௐZLOOௐ\RXௐLQWHJUDWHௐDௐ6RXUFHZHOODZDUGHGௐFRQWUDFWௐLQWRௐ\RXUௐ VDOHVௐSURFHVV"
6RXUFHZHOOௐLVௐDௐWUXVWHGௐEUDQGௐWKDWௐJRYHUQPHQWௐHQWLWLHVௐFDQௐUHO\ௐRQௐWRௐSURYLGHௐDௐZLGHௐYDULHW\ௐRIௐSURGXFWVௐDQGௐVHUYLFHVௐௐ 7KH\ௐDLPௐWRௐVLPSOLI\ௐWKHௐSURFXUHPHQWௐSURFHVVௐRIௐJRYHUQPHQWௐHQWLWLHVௐௐ7KHௐ6RXUFHZHOOௐEUDQGௐLQWHJUDWHVௐDௐWKRURXJKௐ GRFXPHQWDWLRQௐUHYLHZௐRIௐDOOௐYHQGRUVௐSULRUௐWRௐDZDUGLQJௐWKHLUௐFRRSHUDWLYHௐFRQWUDFWௐWRௐHQVXUHௐSURGXFWVௐDQGௐVHUYLFHVௐDUHௐ IURPௐUHSXWDEOHௐYHQGRUVௐௐ7KHௐEUDQGௐSURYLGHVௐDௐVHQVHௐRIௐVKRZLQJௐOHJLWLPDF\ௐDQGௐYHULILFDWLRQௐRIௐRXUௐFRPSDQ\ௐQDPHௐDQGௐ PHPEHUVௐXQGHUVWDQGௐWKDWௐSURGXFWVௐDQGௐVHUYLFHVௐSURYLGHGௐDUHௐIURPௐUHSXWDEOHௐYHQGRUVௐௐ &OLHQWVௐUHFRJQL]HௐWKHௐ6RXUFHZHOOௐEUDQGௐDQGௐWKHLUௐYHQGRUVௐDVௐDௐWUXVWHGௐVRXUFHௐWKDWௐZLOOௐPHHWௐWKHLUௐQHHGVௐௐ7KHௐPDLQௐ VHOOLQJௐSRLQWௐRIௐWKHௐEUDQGௐLVௐWKHௐHOLPLQDWLRQௐRIௐWKHௐQHHGௐWRௐJRௐRXWௐWRௐELGௐௐ6RXUFHZHOOௐKDVௐGRQHௐWKHௐELGGLQJௐIRUௐWKHௐ JRYHUQPHQWௐHQWLWLHVௐZKLFKௐVLPSOLILHVௐWKHௐSXUFKDVLQJௐSURFHVVௐௐ7KLVௐSURFHVVௐQRWௐRQO\ௐVDYHVௐPRQH\ௐEXWௐYDOXDEOHௐWLPHௐDVௐ ZHOOௐௐ6RXUFHZHOOௐKDVௐSURYLGHGௐ1$)*ௐRYHUZKHOPLQJௐRSSRUWXQLWLHVௐWRௐZRUNௐZLWKௐJRYHUQPHQWௐDJHQFLHVௐDFURVVௐWKHௐ8QLWHGௐ 6WDWHVௐௐ
7KHௐ6RXUFHZHOOௐQDPHௐUHSUHVHQWVௐDௐKLJKௐVWDQGDUGௐRIௐLQWHJULW\ௐDQGௐHWKLFVௐDQGௐZHௐDUHௐSURXGௐWRௐEHௐSDUWௐRIௐWKLVௐG\QDPLFௐௐ 6RXUFHZHOOௐPHPEHUVௐKDYHௐDFFHVVௐWRௐDௐFRQWUDFWௐWKDWௐLVௐPRUHௐIOH[LEOHௐWKDQௐWKHௐVWDQGDUGௐELGGLQJௐSURFHVVௐௐ6RXUFHZHOOௐLVௐ DQௐRUJDQL]DWLRQௐWKDWௐDLGVௐJRYHUQPHQWௐHQWLWLHVௐWRௐVWD\ௐFRPSHWLWLYHௐZLWKRXWௐWKHௐIUXVWUDWLRQVௐDQGௐLVVXHVௐLQYROYHGௐZLWKௐWKHௐ WUDGLWLRQDOௐELGGLQJௐSURFHVVௐௐ7KHௐ6RXUFHZHOOௐFRQWUDFWௐFDQௐEHௐDOVRௐFXVWRPL]HGௐWRௐPHHWௐWKHௐQHHGVௐRIௐWKHௐFOLHQWௐௐ7KHௐ VDOHVௐWHDPௐKDVௐLQFRUSRUDWHGௐQRWௐRQO\ௐWKLVௐVWDQGDUGௐRIௐLQWHJULW\ௐLQௐWKHLUௐVDOHVௐSUDFWLFHௐE\ௐHQVXULQJௐFOLHQWVௐZHௐZLOOௐDOZD\Vௐ DVVLVWௐWKHPௐZLWKௐWKHLUௐYHKLFOHௐSXUFKDVLQJௐQHHGVௐௐ7KHௐFRVWௐVDYLQJVௐDQGௐVWUHVVௐIUHHௐQDWXUHௐRIௐWKHௐFRRSHUDWLYHௐFRQWUDFWVௐ IDYRUVௐWKDWௐRIௐWKHௐWUDGLWLRQDOௐELGGLQJௐSURFHVVௐௐ,WௐHQDEOHVௐYHQGRUVௐWRௐZRUNௐZLWKௐTXDOLI\LQJௐJRYHUQPHQWௐHQWLWLHVௐLQௐDௐPRUHௐ HIILFLHQWௐPDQQHUௐௐ:HௐYRZௐWRௐPDLQWDLQௐWKHVHௐOHYHOVௐRIௐVWDQGDUGVௐDFURVVௐWKHௐERDUGௐWKURXJKRXWௐDOOௐGHSDUWPHQWVௐZLWKLQௐ 1DWLRQDOௐ$XWRௐ)OHHWௐ*URXS
6RXUFHZHOOௐLVQ
WௐMXVWௐDௐWUXVWHGௐEUDQG
ௐLW
VௐDௐFRPSUHKHQVLYHௐVROXWLRQௐIRUௐJRYHUQPHQWௐSURFXUHPHQWௐ)URPௐYHKLFOHVௐDQGௐIRRGௐ WRௐWHFKQRORJ\ௐDQGௐDGPLQLVWUDWLYHௐVHUYLFHVௐWKH\ௐRIIHUௐDௐGLYHUVHௐUDQJHௐRIௐKLJKTXDOLW\ௐSURGXFWVௐDQGௐVHUYLFHVௐ3DUWQHULQJௐ ZLWKௐSUHYHWWHGௐYHQGRUVௐHQVXUHVௐUHOLDELOLW\ௐDQGௐSHDFHௐRIௐPLQG 7KHௐIOH[LELOLW\ௐRIௐ6RXUFHZHOOௐFRQWUDFWVௐDOORZVௐXVௐWRௐWDLORUௐRXUௐVHUYLFHVௐWRௐDௐVSHFLILFௐQHHGௐXQOLNHௐWKHௐRQHVL]HILWVDOOௐ DSSURDFKௐRIௐW\SLFDOௐELGGLQJௐ
*RYHUQPHQWௐDJHQFLHVௐDFURVVௐWKHௐ8QLWHGௐ6WDWHVௐOLNHௐ1$)*ௐKDYHௐXWLOL]HGௐ6RXUFHZHOOௐWRௐSURFXUHௐWKHLUௐQHHGVௐHIILFLHQWO\ 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1612

$UHௐ\RXUௐSURGXFWVௐRUௐVHUYLFHVௐDYDLODEOHௐWKURXJKௐDQௐHSURFXUHPHQWௐ RUGHULQJௐSURFHVV"ௐ
,IௐVRௐGHVFULEHௐ\RXUௐHSURFXUHPHQWௐV\VWHPௐDQGௐKRZௐJRYHUQPHQWDOௐ DQGௐHGXFDWLRQDOௐFXVWRPHUVௐKDYHௐXVHGௐLW
2XUௐZHEVLWHௐSURYLGHVௐDௐKDQGVRQௐHPSRZHULQJௐDSSURDFKௐWRௐRUGHULQJௐYHKLFOHVௐRQOLQHௐௐ&OLHQWVௐFDQௐVHDUFKௐWKURXJKௐPDQ\ௐ YHKLFOHௐPDNHVௐDQGௐPRGHOVௐZLWKௐWKHௐDELOLW\ௐWRௐFXVWRPL]HௐDௐYHKLFOHௐWDLORUHGௐWRௐWKHௐVSHFLILFௐQHHGVௐRIௐWKHLUௐDJHQF\ௐௐ$ௐ SHUVRQDOL]HGௐTXRWHௐZLWKௐSULFLQJௐFDQௐEHௐDYDLODEOHௐLQௐDVௐOLWWOHௐDVௐௐPLQXVௐGHSHQGLQJௐRQௐWKHௐFRPSOH[LW\ௐRIௐWKHௐYHKLFOHௐௐ,Iௐ XSILWWLQJௐLVௐQHHGHGௐDௐVDOHVௐUHSUHVHQWDWLYHௐFDQௐEHௐUHDFKHGௐWKURXJKௐSKRQHௐHPDLOௐOLYHௐFKDWௐRUௐQRWHGௐRQௐWKHௐVHOITXRWLQJௐ RQOLQHௐV\VWHPௐ
2QFHௐDௐFXVWRPL]HGௐTXRWHௐLVௐEXLOWௐFOLHQWVௐKDYHௐWKHௐRSWLRQௐWRௐILQDOL]HௐWKHௐVDOHVௐWUDQVDFWLRQௐE\ௐVXEPLWWLQJௐDௐSXUFKDVHௐ RUGHUௐWRௐRXUௐVDOHVௐWHDPௐYLDௐHPDLOௐௐ7KLVௐJLYHVௐFRPSOHWHௐDXWRQRP\ௐWRௐWKHௐFOLHQWௐWRௐSXUFKDVHௐYHKLFOHVௐZLWKRXWௐWKHௐQHHGௐ WRௐVSHDNௐWRௐDௐVDOHVௐUHSௐௐ,IௐDVVLVWDQFHௐLVௐQHHGHGௐWKH\ௐFDQௐFRQWDFWௐVDOHVௐWKURXJKௐHPDLOௐOLYHௐFKDWௐRUௐSKRQHௐௐ,IௐVXSSRUWௐ LVௐUHTXLUHGௐWRௐEXLOGௐDௐTXRWHௐRXUௐVDOHVௐUHSVௐDUHௐDYDLODEOHௐWRௐDVVLVWௐWKHௐFOLHQWௐVWHSௐE\ௐVWHSௐௐ 2QFHௐWKHௐYHKLFOHௐLVௐEXLOWௐWRௐWKHௐFOLHQW¶VௐQHHGVௐJRYHUQPHQWௐDJHQFLHVௐDUHௐDOVRௐDEOHௐWRௐXSORDGௐDௐSXUFKDVHௐRUGHUௐIURPௐ WKHLUௐDFFRXQWௐWRௐSXUFKDVHௐDௐYHKLFOHௐௐ1$)*ௐZLOOௐWKHQௐSURFHVVௐWKHௐSXUFKDVHௐRUGHUௐDQGௐSODFHௐWKHௐYHKLFOHௐRQௐRUGHUௐZLWKௐ WKHௐPDQXIDFWXUHUௐௐ*RYHUQPHQWௐDJHQFLHVௐDUHௐDOVRௐDEOHௐWRௐWUDFNௐWKHௐVWDWXVௐRIௐWKHLUௐRUGHUௐXVLQJௐWKHௐ(7$ௐWUDFNLQJௐ DYDLODEOHௐRQௐWKHௐ1$)*ௐZHEVLWHௐ
2XUௐZHEVLWHௐSXWVௐWKHௐSRZHUௐWRௐRUGHUௐYHKLFOHVௐGLUHFWO\ௐLQௐ\RXUௐKDQGVௐZLWKௐDௐXVHUIULHQGO\ௐDSSURDFKௐWKDWௐHPSRZHUVௐ JRYHUQPHQWௐDJHQFLHVௐWRௐFKRRVHௐWKHௐSHUIHFWௐVROXWLRQௐIRUௐWKHLUௐQHHGVௐ%URZVHௐWKURXJKௐDௐFRPSUHKHQVLYHௐVHOHFWLRQௐRIௐ YHKLFOHௐPDNHVௐDQGௐPRGHOVௐRUௐFXVWRPL]Hௐ\RXUௐLGHDOௐYHKLFOHௐZLWKௐIHDWXUHVௐWDLORUHGௐWRௐ\RXUௐVSHFLILFௐUHTXLUHPHQWVௐ*HWௐDௐ SHUVRQDOL]HGௐTXRWHௐZLWKௐXSIURQWௐSULFLQJௐLQௐDVௐOLWWOHௐDVௐௐPLQXWHVௐGHSHQGLQJௐRQௐWKHௐFRPSOH[LW\ௐRIௐ\RXUௐFKRVHQௐYHKLFOHௐ 8SILWWLQJௐQHHGHG"ௐ1RௐSUREOHPௐ5HDFKௐRXWௐWRௐRXUௐGHGLFDWHGௐVDOHVௐWHDPௐYLDௐSKRQHௐHPDLOௐOLYHௐFKDWௐRUௐVLPSO\ௐPHQWLRQௐ \RXUௐUHTXLUHPHQWVௐGLUHFWO\ௐLQௐWKHௐVHOITXRWLQJௐV\VWHP
2QFHௐDௐJRYHUQPHQWௐPXQLFLSDOLW\ௐLVௐUHDG\ௐWRௐSXUFKDVHௐWKH\ௐFDQௐVLPSO\ௐVXEPLWௐDௐSXUFKDVHௐRUGHUௐWKURXJKௐWKHLUௐRQOLQHௐ DFFRXQWௐ:HௐRIIHUௐFRPSOHWHௐDXWRQRP\ௐDOORZLQJௐEX\HUVௐWRௐDFTXLUHௐYHKLFOHVௐZLWKRXWௐQHHGLQJௐWRௐVSHDNௐGLUHFWO\ௐWRௐDௐVDOHVௐ UHSUHVHQWDWLYHௐௐ+RZHYHUௐRXUௐH[SHUWௐWHDPௐLVௐDOZD\VௐDYDLODEOHௐWRௐDVVLVWௐLIௐWKH\ௐQHHGௐDௐKHOSLQJௐKDQGௐ2XUௐDVVLVWDQFHௐLVௐ DYDLODEOHௐYLDௐHPDLOௐOLYHௐFKDWௐRUௐSKRQHௐ±
)RUௐJRYHUQPHQWௐDJHQFLHVௐWKHௐSURFHVVௐLVௐVWUHDPOLQHGௐHYHQௐIXUWKHUௐ7KH\ௐDUHௐDEOHௐWRௐVWD\ௐLQIRUPHGௐWKURXJKRXWௐWKHௐHQWLUHௐ MRXUQH\ௐZLWKௐRXUௐFRQYHQLHQWௐ(7$ௐWUDFNLQJௐV\VWHPௐDFFHVVLEOHௐULJKWௐRQௐWKHௐ1$)*ௐZHEVLWH ([SHULHQFHௐWKHௐFRQYHQLHQFHௐDQGௐFRQWUROௐRIௐRQOLQHௐYHKLFOHௐRUGHULQJௐIRUௐJRYHUQPHQWௐDJHQFLHVௐZLWKௐ1$)*ௐ9LVLWௐRXUௐ ZHEVLWHௐWRGD\ௐDQGௐHPSRZHUௐ\RXUௐDJHQF\ௐWRௐDFTXLUHௐWKHௐSHUIHFWௐYHKLFOHௐVROXWLRQ $VௐRIௐWRGD\ௐ1DWLRQDOௐ$XWRௐ)OHHWௐ*URXSௐKDVௐRYHUௐௐPHPEHUVௐUHJLVWHUHGௐRQௐRXUௐZHEVLWHௐDQGௐௐFXVWRPHUVௐEX\LQJௐ IURPௐXV


7DEOH
9DOXH$GGHG$WWULEXWHV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐDQ\ௐSURGXFWௐHTXLSPHQWௐPDLQWHQDQFHௐRUௐRSHUDWRUௐ WUDLQLQJௐSURJUDPVௐWKDWௐ\RXௐRIIHUௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐ ,QFOXGHௐGHWDLOVௐVXFKௐDVௐZKHWKHUௐWUDLQLQJௐLVௐVWDQGDUGௐRUௐRSWLRQDOௐ ZKRௐSURYLGHVௐWUDLQLQJௐDQGௐDQ\ௐFRVWVௐWKDWௐDSSO\
1$)*ௐH[WHQGVௐDQ\ௐDQGௐDOOௐ6HUYLFHௐ7UDLQLQJௐ3URJUDPVௐSURYLGHGௐE\ௐWKHௐ0DQXIDFWXUHUௐ0DQ\ௐRIௐWKHௐSURJUDPVௐRIIHUHGௐDUHௐ TXRWHGௐLQGLYLGXDOO\ௐE\ௐWKHௐPDQXIDFWXUHௐEDVHGௐRQௐFODVVௐVL]HௐDQGௐUHJLRQௐRIௐWKHௐFRXQWU\ௐ1$)*ௐZLOOௐSDVVௐWKHVHௐTXRWHVௐ RQWRௐWKHௐPHPEHUௐDWௐ1$)*ௐFRVW 

 'HVFULEHௐDQ\ௐWHFKQRORJLFDOௐDGYDQFHVௐWKDWௐ\RXUௐSURSRVHGௐSURGXFWVௐ RUௐVHUYLFHVௐRIIHU
:LWKௐZRUOGௐOHDGHUVௐLQௐFKDVVLVௐWHFKQRORJ\ௐOLNHௐ)RUGௐ0RWRUௐ&RPSDQ\ௐ*HQHUDOௐ0RWRU¶VௐDQGௐ0$&.ௐ7UXFNௐZKLFKௐWKHௐ PHPEHUௐDXWRPDWLFDOO\ௐJHWVௐWKHௐEHQHILWௐRIௐWKHௐODWHVWௐXSௐWRௐGDWHௐWHFKQRORJ\ௐ1$)*ௐRIIHUVௐRXUௐGHDOHUௐERG\ௐWRௐWKHௐ PHPEHUVௐIRUௐWKHௐPRVWௐOHDGLQJௐXSௐWRௐGDWHௐLQIRUPDWLRQ


 'HVFULEHௐDQ\ௐ³JUHHQ´ௐLQLWLDWLYHVௐWKDWௐUHODWHௐWRௐ\RXUௐFRPSDQ\ௐRUௐWRௐ \RXUௐSURGXFWVௐRUௐVHUYLFHVௐDQGௐLQFOXGHௐDௐOLVWௐRIௐWKHௐFHUWLI\LQJ DJHQF\ௐIRUௐHDFK
1$)*ௐKDVௐ3DUWQHUHGௐWRௐFUHDWHௐDௐௐ86ௐ0D\RUௐ'ULYHௐ&OLPDWHௐ0D\RUௐ3XUFKDVLQJௐ&ROODERUDWLYHௐZZZ'ULYHHYIOHHWRUJௐWRௐ KHOSௐVSUHDGௐWKHௐEHQHILWௐRIௐPHPEHUVௐJRLQJௐௐJUHHQௐ:HௐKDYHௐௐ3XUHௐ(OHFWULFௐYHKLFOHVௐWRௐRIIHUௐVXFKௐDVௐWKHௐ &KHYUROHWௐ%ROWௐDQGௐ)RUGௐ)XVLRQௐZKLFKௐDUHௐDOOௐSUHGHFHVVRUVௐWRௐWKHௐ$OOௐ1HZௐ)RUGௐ(OHFWULFௐ)ௐ:HௐDUHௐFHUWDLQௐRYHUௐ WKHௐQH[WௐIHZௐ\HDUVௐ)RUGௐDQGௐPDQ\ௐRWKHUௐPDQXIDFWXUHUVௐZLOOௐEHௐPDNLQJௐDYDLODEOHௐௐSXUHௐHOHFWULFௐFDEௐFKDVVLVௐIRUௐ PHPEHUVௐWRௐVHOHFWௐIURP


 ,GHQWLI\ௐDQ\ௐWKLUGSDUW\ௐLVVXHGௐHFRODEHOVௐUDWLQJVௐRUௐFHUWLILFDWLRQVௐ WKDWௐ\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐIRUௐWKHௐHTXLSPHQWௐRUௐSURGXFWVௐ LQFOXGHGௐLQௐ\RXUௐ3URSRVDOௐUHODWHGௐWRௐHQHUJ\ௐHIILFLHQF\ௐRUௐ FRQVHUYDWLRQௐOLIHF\FOHௐGHVLJQௐ
FUDGOHWRFUDGOH
ௐRUௐRWKHUௐ
JUHHQVXVWDLQDELOLW\ௐIDFWRUV
)RUGௐ0RWRUௐ&RPSDQ\ௐDQGௐ*HQHUDOௐ0RWRUVௐMXVWௐWRௐQDPHௐௐRIௐWKHௐௐ2(0 VௐZHௐDUHௐUHSUHVHQWLQJௐKDYHௐOHDGLQJௐHGJHௐ
FHUWLILFDWLRQVௐDQGௐUDWLQJௐZKLFKௐSURYLGHௐWKHPௐWKHௐDELOLW\ௐWRௐRIIHUௐWKHUHௐSURGXFWVௐQDWLRQZLGH 

 'HVFULEHௐDQ\ௐ:RPHQௐRUௐ0LQRULW\ௐ%XVLQHVVௐ(QWLW\ௐ
:0%(
ௐ6PDOOௐ
%XVLQHVVௐ(QWLW\ௐ
6%(
ௐRUௐYHWHUDQௐRZQHGௐEXVLQHVVௐFHUWLILFDWLRQV
WKDWௐ\RXUௐFRPSDQ\ௐRUௐ+8%ௐSDUWQHUVௐKDYHௐREWDLQHGௐ8SORDGௐ GRFXPHQWDWLRQௐRIௐFHUWLILFDWLRQௐ
DVௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐ
XSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
:HௐKROGௐDௐ0LQRULW\ௐ&HUWLILFDWLRQௐWKURXJKௐWKHௐ&DOLIRUQLDௐ&OHDULQJௐ+RXVHௐ$XWKRUL]DWLRQ 

 :KDWௐXQLTXHௐDWWULEXWHVௐGRHVௐ\RXUௐFRPSDQ\ௐ\RXUௐSURGXFWVௐRUௐ\RXUௐ VHUYLFHVௐRIIHUௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"ௐ:KDWௐPDNHV \RXUௐSURSRVHGௐVROXWLRQVௐXQLTXHௐLQௐ\RXUௐLQGXVWU\ௐDVௐLWௐDSSOLHVௐWRௐ 6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"
1$)*
VௐGHGLFDWLRQௐWRௐWKHௐPHPEHUௐ1$)*ௐKDVௐEXLOWௐLWVௐGLYLVLRQௐVROHO\ௐIRUௐWKHௐSXUSRVHௐRIௐVHUYLQJௐWKHௐPHPEHUVௐ H[SHULHQFHௐIURPௐRXUௐKRXUௐPHPEHUௐZHEVLWHௐRUௐZHEVLWHௐLPSURYHPHQWVௐDQGௐFDSDELOLWLHVௐWRௐWKLQNLQJௐRXWVLGHௐWKHௐER[ௐWRௐ KHOSௐDௐPHPEHUௐILQGௐDௐVROXWLRQ 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1613
7DEOH
$
:DUUDQW\
'HVFULEHLQGHWDLO\RXUPDQXIDFWXUHUZDUUDQW\SURJUDPLQFOXGLQJFRQGLWLRQVDQGUHTXLUHPHQWVWRTXDOLI\FODLPVSURFHGXUHDQGRYHUDOOVWUXFWXUH <RXPD\XSORDGUHSUHVHQWDWLYHVDPSOHVRI\RXUZDUUDQW\PDWHULDOV LIDSSOLFDEOH
LQWKHGRFXPHQWXSORDGVHFWLRQRI\RXUUHVSRQVHLQDGGLWLRQWRUHVSRQGLQJWRWKHTXHVWLRQVEHORZ /LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐDOOௐSURGXFWVௐSDUWVௐDQGௐODERU" :HௐKDYHௐDWWDFKHGௐDOOௐ:DUUDQW\ௐLQIRUPDWLRQௐSURYLGHGௐE\ௐDOOௐௐPDQXIDFWXUHUVௐRIIHUHGௐLQௐRXUௐSURSRVDOௐDVௐDQௐDGGHGௐ DWWDFKPHQW 

 'Rௐ\RXUௐZDUUDQWLHVௐLPSRVHௐXVDJHௐUHVWULFWLRQVௐRUௐRWKHUௐOLPLWDWLRQVௐ WKDWௐDGYHUVHO\ௐDIIHFWௐFRYHUDJH"
(DFKௐPDQXIDFWXUHUௐKDYHௐWKHUHௐRZQௐXVDJHௐUHVWULFWLRQVௐWKDWௐDௐPHPEHUௐVKRXOGௐEHௐDZDUHௐRIௐ6XFKௐDQௐLPSURSHUௐXVHௐRIௐDௐ FKDVVLVௐPD\ௐQRWௐDOORZௐLWௐWRௐEHௐFRYHUHGௐXQGHUௐZDUUDQW\ௐ)RUௐH[DPSOHௐDௐ)ௐEHLQJௐXVHGௐIRUௐDௐSROLFHௐUDWHGௐSXUVXLWௐ YHKLFOHௐZRXOGௐYRLGௐFHUWDLQௐZDUUDQWLHVௐ:HௐHQFRXUDJHௐIRUௐHDFKௐPHPEHUௐWRௐFRQWDFWௐXVௐIRUௐWKHUHௐSDUWLFXODUௐZDUUDQW\ௐ FRYHUDJH


 'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐWKHௐH[SHQVHௐRIௐWHFKQLFLDQV¶ௐWUDYHOௐWLPHௐ DQGௐPLOHDJHௐWRௐSHUIRUPௐZDUUDQW\ௐUHSDLUV"
<HVௐLQௐVRPHௐFDVHVௐRIௐDௐEUHDNGRZQௐHYHQWௐPDQXIDFWXUHUVௐZRXOGௐWRZௐ\RXUௐYHKLFOHௐWRௐWKHUHௐQHDUHVWௐZDUUDQW\ௐUHSDLUௐIDFLOLW\ 


$UHௐWKHUHௐDQ\ௐJHRJUDSKLFௐUHJLRQVௐRIௐWKHௐ8QLWHGௐ6WDWHVௐRUௐ &DQDGDௐ
DVௐDSSOLFDEOH
ௐIRUௐZKLFKௐ\RXௐFDQQRWௐSURYLGHௐDௐFHUWLILHG
WHFKQLFLDQௐWRௐSHUIRUPௐZDUUDQW\ௐUHSDLUV"ௐௐ
+RZௐZLOOௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHVHௐUHJLRQVௐEHௐ SURYLGHGௐVHUYLFHௐIRUௐZDUUDQW\ௐUHSDLU"
(DFKௐPDQXIDFWXUHௐLVௐGLIIHUHQWௐDQGௐZHௐHQFRXUDJHௐSULRUௐWRௐSXUFKDVLQJௐDௐSURGXFWௐWRௐFDOOௐLQௐDQGௐDVNௐDERXWௐ\RXUௐVSHFLILFௐ UHJLRQௐDQGௐKRZௐLW¶VௐFRYHUHG


 :LOOௐ\RXௐFRYHUௐZDUUDQW\ௐVHUYLFHௐIRUௐLWHPVௐPDGHௐE\ௐRWKHUௐ PDQXIDFWXUHUVௐWKDWௐDUHௐSDUWௐRIௐ\RXUௐSURSRVDOௐRUௐDUHௐWKHVHௐ ZDUUDQWLHVௐLVVXHVௐW\SLFDOO\ௐSDVVHGௐRQௐWRௐWKHௐRULJLQDOௐHTXLSPHQW PDQXIDFWXUHU"
$OOௐZDUUDQWLHVௐDUHௐSDVVHGௐRQௐWRௐWKHௐRULJLQDOௐHTXLSPHQWௐPDQXIDFWXUHU 

 :KDWௐDUHௐ\RXUௐSURSRVHGௐH[FKDQJHௐDQGௐUHWXUQௐSURJUDPVௐDQGௐ SROLFLHV"
:HௐRIIHUௐQRௐH[FKDQJHௐUHWXUQௐSURJUDPVௐRUௐSROLFLHVௐ2QFHௐDQௐRUGHUௐLVௐLQௐSURGXFWLRQௐZLWKௐWKHௐIDFWRU\ௐDQGௐ1$)*ௐFDQௐQRWௐ FDQFHOௐWKHௐRUGHUௐDIWHUௐWU\LQJௐWRௐFDQFHOௐZLWKௐWKHௐPDQXIDFWXUHUௐWKHQௐWKHௐRUGHUௐLVௐQRQFDQFHOODEOH 

 'HVFULEHௐDQ\ௐVHUYLFHௐFRQWUDFWௐRSWLRQVௐIRUௐWKHௐLWHPVௐLQFOXGHGௐLQௐ \RXUௐSURSRVDO
:HௐRIIHUௐDQ\ௐDQGௐDOOௐPDQXIDFWXUHUௐVHUYLFHௐFRQWUDFWVௐWRௐDOOௐPHPEHUVௐ7KHUHௐDUHௐVHYHUDOௐSDUDPHWHUVௐZKLFKௐDௐFXVWRPL]HGௐ VHUYLFHௐFRQWUDFWௐFDQௐEHௐFUHDWHGௐ1$)*ௐZLOOௐWUHDWௐHDFKௐRIௐWKHVHௐDVௐDQௐDGGHGௐIDFWRU\ௐRSWLRQௐDQGௐIROORZௐWKHௐVDPHௐ GLVFRXQWௐVFKHGXOHௐLQௐWKHௐSULFHௐILOH


7DEOH
3D\PHQW7HUPVDQG)LQDQFLQJ2SWLRQV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐ\RXUௐSD\PHQWௐWHUPVௐDQGௐDFFHSWHGௐSD\PHQWௐPHWKRGV 3D\PHQWௐWHUPVௐDUHௐ1HWௐௐZLWKௐDௐGD\ௐJUDFHௐSHULRG 

 'HVFULEHௐDQ\ௐOHDVLQJௐRUௐILQDQFLQJௐRSWLRQVௐDYDLODEOHௐIRUௐXVHௐE\ௐ HGXFDWLRQDOௐRUௐJRYHUQPHQWDOௐHQWLWLHV
1$)*ௐKDVௐSDUWQHUHGௐZLWKௐ1DWLRQDOௐ&RRSHUDWLYHௐ/HDVLQJௐWRௐRIIHUௐ6RXUFHZHOOௐ&RQWUDFWௐ/HDVHௐ7HUPVௐWRௐDOOௐ1$)*ௐ4XRWHVௐ IRUௐDOOௐ6RXUFHZHOOௐ0HPEHUVௐ:HௐKDYHௐDWWDFKHGௐDௐ3')ௐFDOOHGௐ³1&/ௐ6DPSOHௐ/HDVH´ௐLQௐWKHௐ=LSௐ)LOHௐ&DOOHGௐ³0HPEHUௐ :DONௐ7KURXJK´


 'HVFULEHௐDQ\ௐVWDQGDUGௐWUDQVDFWLRQௐGRFXPHQWVௐWKDWௐ\RXௐSURSRVHௐWRௐ XVHௐLQௐFRQQHFWLRQௐZLWKௐDQௐDZDUGHGௐFRQWUDFWௐ
RUGHUௐIRUPVௐWHUPVௐ
DQGௐFRQGLWLRQVௐVHUYLFHௐOHYHOௐDJUHHPHQWVௐHWF
ௐ8SORDGௐDௐVDPSOHௐ
RIௐHDFKௐ
DVௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
:HௐDWWDFKHGௐRXUௐ6WDQGDUGௐ'RFXPHQWVௐWKDWௐDOOௐPHPEHUௐZRXOGௐVHHௐLQௐDௐW\SLFDOௐWUDQVDFWLRQௐ6WDUWLQJௐZLWKௐDOOௐTXRWHVௐ ZKLFKௐFRQWDLQௐWKHUHௐXQLTXHௐ4XRWHௐ,'ௐRQௐWKHௐWRSௐRIௐHDFKௐTXRWHௐ$ௐPHPEHUௐFDQௐWKHQௐFDOOௐDQGௐKHOSௐXVௐLGHQWLI\ௐZKLFKௐ TXRWHௐWKH\ௐDUHௐLQTXLULQJௐZLWKLQௐVRௐZHௐFDQௐKHOSௐKHPௐTXLFNHUௐ (DFKௐTXRWHௐKDVௐLWVௐOLVWௐRIௐVWDQGDUGௐHTXLSPHQWௐDQGௐVHOHFWHGௐHTXLSPHQWௐWKHௐPHPEHUௐKDVௐFKRVHQௐIRUௐWKHPVHOYHVௐ )ROORZHGௐE\ௐWKHௐFRQWUDFWௐGLVFRXQWௐRQௐHDFKௐFRYHUௐSDJHௐVRௐWKHௐPHPEHUௐFDQௐHDVLO\ௐVHHௐWKHUHௐ6RXUFHZHOOௐVDYLQJௐ$ௐ VDPSOHௐWUDQVDFWLRQௐKDVௐEHHQௐDWWDFKHG


 'Rௐ\RXௐDFFHSWௐWKHௐ3FDUGௐSURFXUHPHQWௐDQGௐSD\PHQWௐSURFHVV"ௐ ,IௐVRௐLVௐWKHUHௐDQ\ௐDGGLWLRQDOௐFRVWௐWRௐ6RXUFHZHOOௐSDUWLFLSDWLQJ HQWLWLHVௐIRUௐXVLQJௐWKLVௐSURFHVV"
<HVௐXSௐWRௐௐௐSHUௐYHKLFOHௐDQ\ௐDPRXQWௐKLJKHUௐWKDQௐௐௐZRXOGௐFDUU\ௐDௐ3FDUGௐ&UHGLWௐ&DUGௐWUDQVDFWLRQௐIHHௐ ZKLFKௐZLOOௐEHௐSDVVHGௐRQWRௐWKHௐPHPEHU 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1614
7DEOH
3ULFLQJDQG'HOLYHU\
3URYLGHGHWDLOHGSULFLQJLQIRUPDWLRQLQWKHTXHVWLRQVWKDWIROORZEHORZ.HHSLQPLQGWKDWUHDVRQDEOHSULFHDQGSURGXFWDGMXVWPHQWVFDQEHPDGHGXULQJWKHWHUPRIDQDZDUGHG&RQWUDFWDV GHVFULEHGLQWKH5)3WKHWHPSODWH&RQWUDFWDQGWKH6RXUFHZHOO3ULFHDQG3URGXFW&KDQJH5HTXHVW)RUP /LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐ\RXUௐSULFLQJௐPRGHOௐ
HJௐOLQHLWHPௐGLVFRXQWVௐRUௐSURGXFW
FDWHJRU\ௐGLVFRXQWV
ௐ
3URYLGHௐGHWDLOHGௐSULFLQJௐGDWDௐ
LQFOXGLQJௐVWDQGDUGௐRUௐOLVWௐSULFLQJௐ
DQGௐWKHௐ6RXUFHZHOOௐGLVFRXQWHGௐSULFH
ௐRQௐDOOௐRIௐWKHௐLWHPVௐWKDWௐ\RXௐ
ZDQWௐ6RXUFHZHOOௐWRௐFRQVLGHUௐDVௐSDUWௐRIௐ\RXUௐ5)3ௐUHVSRQVHௐ ,IௐDSSOLFDEOHௐSURYLGHௐDௐ6.8ௐIRUௐHDFKௐLWHPௐLQௐ\RXUௐSURSRVDOௐ 8SORDGௐ\RXUௐSULFLQJௐPDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐ
XSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
1$)*ௐLVௐRIIHULQJௐ/LQHௐ,WHPௐ'LVFRXQWVௐ2IIௐ0653ௐIRUௐௐPDQXIDFWXUHUVௐGHWDLOHGௐLQௐWKHௐ3ULFHௐ)LOHௐ1$)*ௐLVௐRIIHULQJௐDOOௐ 8SILWVௐWRௐEHௐDGGHGௐWRௐDQ\ௐDQGௐDOOௐFKDVVLVௐFDEVௐDQGௐWUXFNVௐGHWDLOVௐDUHௐRQௐWKHௐ6XPPDU\ௐ3DJHௐLQௐWKHௐSULFHௐILOH 

 4XDQWLI\ௐWKHௐSULFLQJௐGLVFRXQWௐUHSUHVHQWHGௐE\ௐWKHௐSULFLQJௐSURSRVDOௐ LQௐWKLVௐUHVSRQVHௐ)RUௐH[DPSOHௐLIௐWKHௐSULFLQJௐLQௐ\RXUௐUHVSRQVHௐ UHSUHVHQWVௐDௐSHUFHQWDJHௐGLVFRXQWௐIURPௐ0653ௐRUௐOLVWௐVWDWHௐWKHௐ SHUFHQWDJHௐRUௐSHUFHQWDJHௐUDQJH
(DFKௐ0DQXIDFWXUHௐ3URGXFWௐ5DQJHௐLVௐGHWDLOHGௐLQௐWKHௐWDEVௐEHORZௐKHUHௐLVௐDQௐRYHUYLHZௐௐௐௐௐௐௐௐௐௐௐௐ )RUGௐ0RWRUௐ&RPSDQ\ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
5$0ௐ6WDOODQWLVௐ&RPSDQ\ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
&KHYUROHWௐIURPௐௐWRௐ
ௐௐௐௐௐௐௐௐௐௐௐௐ
$XWRFDUௐDWௐ
ௐௐௐௐௐௐௐௐௐௐௐௐ
,68=8ௐDWௐௐௐௐௐௐௐௐௐௐௐௐௐ
9ROYRௐDWௐௐௐௐௐௐௐௐௐௐௐௐௐ
)UHLJKWOLQHUௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
:HVWHUQௐ6WDUௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
0$&.ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
.HQZRUWKௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
3HWHUELOWௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
%DWWOHௐ0RWRUVௐDWௐௐௐௐௐௐௐௐௐௐௐௐௐ
5,=2ௐIURPௐௐWRௐௐௐௐௐௐௐௐௐௐௐௐௐ
5((ௐDWௐௐௐௐௐௐௐௐௐௐௐௐௐ
%ROOLQJHUௐ0RWRUVௐDWௐௐௐௐௐௐௐௐௐௐௐௐௐ
8SILWVௐFDQௐEHௐDGGHGௐDWௐGHDOHUௐLQYRLFHௐXSௐWRௐௐGHWDLOHGௐLQௐWKHௐSULFHௐILOH 


'HVFULEHௐDQ\ௐTXDQWLW\ௐRUௐYROXPHௐGLVFRXQWVௐRUௐUHEDWHௐSURJUDPVௐ WKDWௐ\RXௐRIIHU
:HௐHQFRXUDJHௐDQ\ௐDQGௐDOOௐPHPEHUVௐWRௐFRQWDFWௐXVௐLIௐFRQVLGHULQJௐRUGHULQJௐௐDWௐWLPHௐRIௐRUGHUௐRUௐPRUHௐXQLWVௐIRUௐDQௐ DGGLWLRQDOௐGLVFRXQWௐTXRWH 

 3URSRVHௐDௐPHWKRGௐRIௐIDFLOLWDWLQJௐ³VRXUFHG´ௐSURGXFWVௐRUௐUHODWHGௐ VHUYLFHVௐZKLFKௐPD\ௐEHௐUHIHUUHGௐWRௐDVௐ³RSHQௐPDUNHW´ௐLWHPVௐ RUௐ³QRQVWDQGDUGௐRSWLRQV´ௐ)RUௐH[DPSOHௐ\RXௐPD\ௐVXSSO\ௐVXFKௐ LWHPVௐ³DWௐFRVW´ௐRUௐ³DWௐFRVWௐSOXVௐDௐSHUFHQWDJH´ௐRUௐ\RXௐPD\ௐVXSSO\ௐ DௐTXRWHௐIRUௐHDFKௐVXFKௐUHTXHVW
2SHQௐ0DUNHWௐSURGXFWVௐRUௐ6RXUFHGௐ*RRGVௐZLOOௐEHௐWUHDWHGௐDVௐDQ\ௐXSILWௐDQGௐPD\ௐEHௐTXRWHGௐXSௐWRௐDௐௐPDUNXSௐLIௐ DSSOLFDEOH


 ,GHQWLI\ௐDQ\ௐHOHPHQWௐRIௐWKHௐWRWDOௐFRVWௐRIௐDFTXLVLWLRQௐWKDWௐLVௐ127ௐ LQFOXGHGௐLQௐWKHௐSULFLQJௐVXEPLWWHGௐZLWKௐ\RXUௐUHVSRQVHௐ
7KLVௐLQFOXGHVௐDOOௐDGGLWLRQDOௐFKDUJHVௐDVVRFLDWHGௐZLWKௐDௐSXUFKDVH WKDWௐDUHௐQRWௐGLUHFWO\ௐLGHQWLILHGௐDVௐIUHLJKWௐRUௐVKLSSLQJௐFKDUJHVௐ)RUௐ H[DPSOHௐOLVWௐFRVWVௐIRUௐLWHPVௐOLNHௐSUHGHOLYHU\ௐLQVSHFWLRQௐ LQVWDOODWLRQௐVHWௐXSௐPDQGDWRU\ௐWUDLQLQJௐRUௐLQLWLDOௐLQVSHFWLRQௐ,GHQWLI\ௐ DQ\ௐSDUWLHVௐWKDWௐLPSRVHௐVXFKௐFRVWVௐDQGௐWKHLUௐUHODWLRQVKLSௐWRௐWKHௐ 3URSRVHU
$OOௐFRQVLGHUDWLRQVௐKDYHௐEHHQௐWDNHQௐLQWRௐDFFRXQWௐLQௐWKHௐSULFHௐILOHௐLQௐLWVௐHQWLUHW\ௐ3ULFHௐ6XPPDU\ௐ3DJHௐDQGௐ3ULFHௐ7DEVௐ FRQWDLQௐDOOௐFRVWVௐDVVRFLDWHGௐZLWKௐDOOௐTXRWHVௐ,IௐDௐPHPEHUௐZRXOGௐOLNHௐDௐTXRWHௐIRUௐDௐSDUWLFXODUௐVLWXDWLRQௐDQGௐWKHௐLWHPௐ QHHGHGௐVSHFLDOௐWUDLQLQJௐRUௐLQVWDOODWLRQௐWKHVHௐFKDUJHVௐZRXOGௐEHௐDGGHGௐDVௐSDUWௐRIௐWKHௐXSILWௐDQGௐLQFOXGHGௐLQௐWKHௐ PHPEHUVௐTXRWH


 ,IௐIUHLJKWௐGHOLYHU\ௐRUௐVKLSSLQJௐLVௐDQௐDGGLWLRQDOௐFRVWௐWRௐWKHௐ 6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐGHVFULEHௐLQௐGHWDLOௐWKHௐFRPSOHWHௐ IUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐSURJUDP
$OOௐPDQXIDFWXUHUVௐFKDUJHௐDௐVWDQGDUGL]HGௐ³)DFWRU\ௐ'HVWLQDWLRQௐ&KDUJH´ௐZKLFKௐLVௐGLVSOD\HGௐRQௐDOOௐZLQGRZௐVWLFNHUVௐDQGௐ RQௐDOOௐWUXFNVௐRQௐDௐGHDOHU¶VௐORWௐ7KLVௐLVௐQRWௐWKHௐQHHGHGௐGHVWLQDWLRQௐFKDUJHௐWKDWௐPD\EHௐFKDUJHGௐWRௐWKHQௐVKLSௐDௐFKDVVLVௐ WRௐDQGௐIURPௐDQௐLQVWDOOHUௐWKHVHௐVXEVHTXHQWௐPRYHPHQWVௐDUHௐDOOௐDGGHGௐIUHLJKWௐFKDUJHVௐDQGௐZLOOௐGLVSOD\HGௐRQௐWKHௐ PHPEHUVௐTXRWH


 6SHFLILFDOO\ௐGHVFULEHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐWHUPVௐRUௐ SURJUDPVௐDYDLODEOHௐIRUௐ$ODVNDௐ+DZDLLௐ&DQDGDௐRUௐDQ\ௐRIIVKRUHௐ GHOLYHU\
)UHLJKWௐWRௐWKHVHௐUHJLRQVௐFDUU\ௐDௐVSHFLILFௐORJLVWLFDOௐEDUULHUௐZKLFKௐFDUU\ௐDGGHGௐFRVWௐVXFKௐDVௐIHUU\ௐSRUWௐDQGௐGULYHUௐFRVWௐ ERWKௐWRௐDQGௐIURPௐWKHௐPDLQODQGௐ7KHVHௐDGGHGௐFRVWVௐZLOOௐEHௐGLVFORVHGௐDQGௐDGGHGௐWRௐDQ\ௐTXRWHௐIRUௐWKHௐPHPEHUௐWRௐ UHYLHZ


 'HVFULEHௐDQ\ௐXQLTXHௐGLVWULEXWLRQௐDQGRUௐGHOLYHU\ௐPHWKRGVௐRUௐ RSWLRQVௐRIIHUHGௐLQௐ\RXUௐSURSRVDO
1$)*ௐZLOOௐXWLOL]HௐWKHௐSRZHUௐDQGௐH[SHUWLVHௐRIௐWKHௐDOUHDG\ௐHVWDEOLVKHGௐ$XWRPRELOHௐ)UDQFKLVHௐ'LVWULEXWLRQௐ1HWZRUNௐWRௐKDYHௐ PHPEHUVௐYHKLFOHVௐGHOLYHUHGௐSURPSWO\ௐWKHUHௐGHVWLQDWLRQ 

7DEOH
3ULFLQJ2IIHUHG
/LQH
,WHP 7KH3ULFLQJ2IIHUHGLQWKLV3URSRVDOLV

&RPPHQWV
 FEHWWHUWKDQWKH3URSRVHUW\SLFDOO\RIIHUVWR*32VFRRSHUDWLYHSURFXUHPHQWRUJDQL]DWLRQVRUVWDWHSXUFKDVLQJGHSDUWPHQWV 1$)*ௐ2IIHUVௐ0HPEHUVௐRIௐ6RXUFHZHOOௐWKHௐ YHU\ௐEHVWௐVHOHFWLRQௐDQGௐVHUYLFHௐIRUௐWKHௐ
RYHUDOOௐEHVWௐYDOXHௐZHௐFDQௐRIIHU
7DEOH
$XGLWDQG$GPLQLVWUDWLYH)HH
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 6SHFLILFDOO\ௐGHVFULEHௐDQ\ௐVHOIDXGLWௐSURFHVVௐRUௐSURJUDPௐWKDWௐ\RXௐ SODQௐWRௐHPSOR\ௐWRௐYHULI\ௐFRPSOLDQFHௐZLWKௐ\RXUௐSURSRVHGௐ&RQWUDFW ZLWKௐ6RXUFHZHOOௐ
7KLVௐSURFHVVௐLQFOXGHVௐHQVXULQJௐWKDWௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐ HQWLWLHVௐREWDLQௐWKHௐSURSHUௐSULFLQJௐWKDWௐWKHௐ9HQGRUௐUHSRUWVௐDOOௐVDOHVௐ XQGHUௐWKHௐ&RQWUDFWௐHDFKௐTXDUWHUௐDQGௐWKDWௐWKHௐ9HQGRUௐUHPLWVௐWKH SURSHUௐDGPLQLVWUDWLYHௐIHHௐWRௐ6RXUFHZHOOௐ
3URYLGHௐVXIILFLHQWௐGHWDLOௐWRௐVXSSRUWௐ\RXUௐDELOLW\ௐWRௐUHSRUWௐTXDUWHUO\ௐ VDOHVௐWRௐ6RXUFHZHOOௐDVௐGHVFULEHGௐLQௐWKHௐ&RQWUDFWௐWHPSODWH :HௐKDYHௐFUHDWHGௐDௐPHPEHUௐIULHQGO\ௐWRௐEXLOGௐDQGௐSULFHௐWKHUHௐFKDVVLVௐFDEVௐRQௐWKHௐSULFLQJௐLVௐEXLOWௐGLUHFWO\ௐLQWRௐWKHௐ ZHEVLWHௐDQGௐLVௐORDGHGௐGDLO\ௐE\ௐWKHௐPDQXIDFWXUHௐ0653ௐLQIRUPDWLRQௐ2XUௐV\VWHPௐZLOOௐSURYLGHௐDQௐDFFXUDWHௐTXRWHௐ



ௐ
RIௐWKHௐWLPHௐ:HௐKDYHௐVWUHDPௐOLQHGௐKRZௐRXUௐDGPLQௐIHHௐLVௐSURFHVVHGௐWRௐDOORZௐDௐTXLFNௐௐGD\ௐWXUQௐDURXQGௐRQௐ TXDUWHUO\ௐUHSRUWV


 ,Iௐ\RXௐDUHௐDZDUGHGௐDௐFRQWUDFWௐSURYLGHௐDௐIHZௐH[DPSOHVௐRIௐLQWHUQDOௐ PHWULFVௐWKDWௐZLOOௐEHௐWUDFNHGௐWRௐPHDVXUHௐZKHWKHUௐ\RXௐDUHௐKDYLQJௐ VXFFHVVௐZLWKௐWKHௐFRQWUDFW
:HௐKDYHௐLQWHUQDOௐFKDUWVௐWKDWௐWUDFNௐKRZௐPDQ\ௐPHPEHUVௐZHௐDUHௐVHUYLQJௐSHUௐPRQWKௐDQGௐZKDWௐUHJLRQVௐZHௐQHHGௐWRௐ PDUNHWௐLQWRௐWRௐUDLVHௐDZDUHQHVVௐRIௐ6RXUFHZHOOௐDQGௐRXUௐFRQWUDFWௐ:HௐDOVRௐWUDFNௐKRZௐPDQ\ௐYHKLFOHVௐZHௐGHOLYHUௐWRௐ PHPEHUVௐWRௐVHHௐLIௐRXUௐYROXPHௐLVௐSLFNLQJௐXSௐRUௐZKHUHௐWKHௐFXUUHQWௐPDUNHWௐLVௐDWௐDVௐLWௐGRHVௐIOXFWXDWH 

 ,GHQWLI\ௐDௐSURSRVHGௐDGPLQLVWUDWLYHௐIHHௐWKDWௐ\RXௐZLOOௐSD\ௐWRௐ 6RXUFHZHOOௐIRUௐIDFLOLWDWLQJௐPDQDJLQJௐDQGௐSURPRWLQJௐWKHௐ 6RXUFHZHOOௐ&RQWUDFWௐLQௐWKHௐHYHQWௐWKDWௐ\RXௐDUHௐDZDUGHGௐDௐ &RQWUDFWௐ7KLVௐIHHௐLVௐW\SLFDOO\ௐFDOFXODWHGௐDVௐDௐSHUFHQWDJHௐRIௐ 9HQGRU¶VௐVDOHVௐXQGHUௐWKHௐ&RQWUDFWௐRUௐDVௐDௐSHUXQLWௐIHH
ௐLWௐLVௐQRWௐ
DௐOLQHLWHPௐDGGLWLRQௐWRௐWKHௐ0HPEHU¶VௐFRVWௐRIௐJRRGVௐ

6HHௐWKHௐ5)3ௐDQGௐWHPSODWHௐ&RQWUDFWௐIRUௐDGGLWLRQDOௐGHWDLOV

2XUௐ$GPLQௐ)HHௐKDVௐEHHQௐVWUHDPOLQHGௐWRௐDOORZௐIRUௐJURZWKௐWRௐRFFXUௐZLWKௐPDLQWDLQLQJௐDௐKLJKௐOHYHOௐRIௐDFFXUDF\ௐDQGௐ UHSRUWLQJௐ2XUௐSURSRVHGௐDGPLQௐIHHௐZRXOGௐIROORZௐWKHVHௐJXLGHOLQHV

)ODWௐௐௐSHUௐXQLWௐIRUௐDOOௐXQLWVௐH[FOXGLQJௐ$ODQௐ-D\ௐ$XWRPRWLYHௐ1HWZRUNௐLQௐ)ORULGD 8QLWVௐVROGௐWKURXJKௐ$ODQௐ-D\ௐ$XWRPRWLYHௐ1HWZRUNௐLQௐ)ORULGDௐZLOOௐKDYHௐDௐௐIODW 

Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1615
7DEOH$
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV 3URSRVHUVVXEPLWWLQJDSURSRVDOLQ&DWHJRU\DVGHILQHGKHUHLQZLOOEHVXEPLWWLQJLQWKHEURDGFDWHJRU\WKDWLQFOXGHVDOOW\SHVRIHQJLQHVIXHODQGSURSXOVLRQV\VWHPV)RUH[DPSOHLID 3URSRVHURIIHUVFKDVVLVDQGFDEVZLWK,QWHUQDO&RPEXVWLRQ(QJLQHV ,&(
DVZHOODVFKDVVLVDQGFDEVZLWKHOHFWULFSURSXOVLRQV\VWHPVWKH3URSRVHUVKRXOGGHVLJQDWHLWLVVHHNLQJDQDZDUG LQ&DWHJRU\RQO\3URSRVHUVVHHNLQJDQDZDUGLQ&DWHJRU\DVGHILQHGKHUHLQPXVWLQFOXGHDWOHDVWRQHVROXWLRQRIIHUHGZLWKLQWKHVFRSHRI&DWHJRU\IRUHOHFWULFSURSXOVLRQV\VWHPV RQO\
/LQH,WHP &DWHJRU\6HOHFWLRQ


&DWHJRU\
$OOHQJLQHVIXHODQGSURSXOVLRQW\SHFKDVVLVDQGFDEV 

7DEOH%
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV /LQH
,WHP 4XHVWLRQ 5HVSRQVH

 3URYLGHௐDௐGHWDLOHGௐGHVFULSWLRQௐRIௐWKHௐHTXLSPHQWௐSURGXFWVௐDQGௐ VHUYLFHVௐWKDWௐ\RXௐDUHௐRIIHULQJௐLQௐ\RXUௐSURSRVDO
ௐ0DQXIDFWXUHUVௐWRWDOLQJௐௐPDNHVௐDQGௐPRGHOVௐUDQJLQJௐIURPௐ&ODVVௐௐWRௐ&ODVVௐௐ&DEௐDQௐ&KDVVLVௐDQGௐWUXFNVௐ:LWKௐ DYDLODEOHௐ8SILWVௐWRௐEHௐDGGHGௐUDQJLQJௐIURPௐWRROௐER[HVௐWRௐ/LQHௐ0HFKDQLFVௐ%RGLHVௐ$Q\ௐDQGௐDOOௐXSILWVௐFDQௐEHௐDGGHGௐWRௐRXUௐ FKDVVLVௐFDEVௐHLWKHUௐE\ௐRXUௐXSILWௐSDUWQHUௐVXSSOLHUௐRUௐE\ௐDௐPHPEHUVௐXSILWௐVXSSOLHUௐZRUNLQJௐZLWKௐ1$)*ௐWRௐSURYLGHௐDௐ7XUQௐ .H\ௐ4XRWH


 :LWKLQௐWKLVௐ5)3ௐFDWHJRU\ௐWKHUHௐPD\ௐEHௐVXEFDWHJRULHVௐRIௐ VROXWLRQVௐ/LVWௐVXEFDWHJRU\ௐWLWOHVௐWKDWௐEHVWௐGHVFULEHௐ\RXUௐ SURGXFWVௐDQGௐVHUYLFHV
1$)*ௐ/LVWVௐDOOௐPDNHVௐDQGௐPRGHOVௐLQௐHDFKௐ=,3ௐILOHௐXQGHUௐ=,3ௐ)LOHௐ³$OOௐௐ0DQXIDFWXUHUV´ௐUHSUHVHQWLQJௐDௐFRPELQHGௐ KXQGUHG¶VௐPDNHVௐDQGௐPRGHOHQJLQHௐFRPELQDWLRQVௐIRUௐPHPEHUVௐWRௐFKRRVHௐIURPௐDORQJௐZLWKௐDௐVXEWLWOHௐ³8SILWV´ௐGHWDLOHGௐLQௐ WKHௐSULFHௐILOH
 'HVFULEHௐDQ\ௐPDQXIDFWXULQJௐSURFHVVHVௐRUௐPDWHULDOVௐXWLOL]HGௐWKDWௐ FRQWULEXWHௐWRௐFKDVVLVௐVWUHQJWKௐFDEௐVWUHQJWKௐRYHUDOOௐGXUDELOLW\ௐ GULYHUௐVDIHW\
/HDGLQJௐPDWHULDOVௐDUHௐXVHGௐE\ௐWKHௐ2(0
VௐGDLO\ௐWRௐVDIHO\ௐVXSSO\ௐDOOௐPHPEHUVௐZLWKௐWKHௐEHVWௐRQௐWKHௐPDUNHWௐSODFHௐIRUௐHDFKௐ 2(0
 'HVFULEHௐDQ\ௐGLIIHUHQWLDWLQJௐVHUYLFHDELOLW\ௐDWWULEXWHVௐ UHPRWHௐ
GLDJQRVWLFVௐHWF
ௐ\RXUௐSURSRVDOௐRIIHUV
(DFKௐ2(0ௐKDVௐWKHUHௐRZQௐXQLTXHௐDWWULEXWHௐWKDWௐDOOௐFDWHUௐDQGௐVHUYHௐWKHௐPHPEHUV 7DEOH
&DWHJRU\'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV ,QGLFDWHEHORZLIWKHOLVWHGW\SHVRUFODVVHVRIHTXLSPHQWSURGXFWVDQGVHUYLFHVDUHRIIHUHGZLWKLQ\RXUSURSRVDO3URYLGHDGGLWLRQDOFRPPHQWVLQWKHWH[WER[SURYLGHGDVQHFHVVDU\ 3URSRVHUVVXEPLWWLQJDSURSRVDOLQ&DWHJRU\ZLOOEHVXEPLWWLQJLQWKHEURDGFDWHJRU\WKDWLQFOXGHVDOOW\SHVRIHQJLQHVIXHODQGSURSXOVLRQV\VWHPV6HH5)36HFWLRQ,,%IRUGHWDLOV :HZLOOQRWEHVXEPLWWLQJIRU7DEOH
&DWHJRU\'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV /LQH
,WHP &DWHJRU\RU7\SH 2IIHUHG
&KDVVLV7\SH
,&(DQGRU%(9
&RPPHQWV
 &ODVVௐௐFKDVVLV <HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVV 

 &ODVVௐௐFKDVVLV <HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVV 

 &ODVVௐௐFKDVVLV <HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVV 

 &ODVVௐௐFKDVVLV <HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVV 

 &ODVVௐௐFKDVVLV <HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVV 


5HODWHGௐHTXLSPHQWௐDFFHVVRULHVௐ
SDUWVௐXSILWWLQJௐVHUYLFHVௐXVHGௐFKDVVLVௐ
DQGௐ&ODVVௐௐFKDVVLV
<HV
1R
%RWK&KDVVLV7\SHV
,&(DQG%(9
$OOௐௐ0DQXIDFWXUHVௐDUHௐOLVWHGௐLQௐWKHௐSULFHௐILOHௐDORQJௐZLWKௐHDFKௐ 2(0
VௐSURGXFWௐRIIHULQJௐIRUௐWKLVௐFODVVௐ$OOௐXSILWWLQJௐLVௐDYDLODEOHௐDQGௐ RXWOLQHGௐLQௐWKHௐSULFLQJௐVXPPDU\
7DEOH
&DWHJRU\'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV ,QGLFDWHEHORZLIWKHOLVWHGW\SHVRUFODVVHVRIHTXLSPHQWSURGXFWVDQGVHUYLFHVDUHRIIHUHGZLWKLQ\RXUSURSRVDO3URYLGHDGGLWLRQDOFRPPHQWVLQWKHWH[WER[SURYLGHGDVQHFHVVDU\ 3URSRVHUVVHHNLQJDQDZDUGLQ&DWHJRU\DVGHILQHGKHUHLQPXVWLQFOXGHDWOHDVWRQHVROXWLRQRIIHUHGZLWKLQWKHVFRSHRI&DWHJRU\IRUHOHFWULFSURSXOVLRQV\VWHPVRQO\6HH5)3 6HFWLRQ,,%IRUGHWDLOV
:HZLOOQRWEHVXEPLWWLQJIRU7DEOH
&DWHJRU\'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV /LQH
,WHP &DWHJRU\RU7\SH 2IIHUHG
&RPPHQWV
 %DWWHU\ௐ(OHFWULFௐ9HKLFOHௐ
%(9

&ODVVௐௐ&KDVVLV
<HV
1R 

 %DWWHU\ௐ(OHFWULFௐ9HKLFOHௐ
%(9

&ODVVௐௐ&KDVVLV
<HV
1R 

 %DWWHU\ௐ(OHFWULFௐ9HKLFOHௐ
%(9

&ODVVௐௐ&KDVVLV
<HV
1R 

 %DWWHU\ௐ(OHFWULFௐ9HKLFOHௐ
%(9

&ODVVௐௐ&KDVVLV
<HV
1R 

 %DWWHU\ௐ(OHFWULFௐ9HKLFOHௐ
%(9

&ODVVௐௐ&KDVVLV
<HV
1R 

 5HODWHGௐHTXLSPHQWௐDFFHVVRULHVௐSDUWVௐXSILWWLQJௐ
VHUYLFHVௐXVHGௐFKDVVLVௐDQGௐ&ODVVௐௐFKDVVLV
<HV
1R
Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1616
7DEOH
([FHSWLRQVWR7HUPV&RQGLWLRQVRU6SHFLILFDWLRQV)RUP /LQH,WHP127,&(
7RLGHQWLI\DQ\H[FHSWLRQRUWRUHTXHVWDQ\PRGLILFDWLRQWR6RXUFHZHOOVWDQGDUG&RQWUDFWWHUPVFRQGLWLRQVRUVSHFLILFDWLRQVD3URSRVHUPXVWVXEPLWWKHSURSRVHG H[FHSWLRQ
V
RUUHTXHVWHGPRGLILFDWLRQ
V
YLDUHGOLQHLQWKH&RQWUDFW7HPSODWHSURYLGHGLQWKH³%LG'RFXPHQWV´VHFWLRQ3URSRVHUPXVWXSORDGWKHUHGOLQHLQWKH³5HTXHVWHG([FHSWLRQV´ XSORDGILHOG$OOH[FHSWLRQVDQGRUSURSRVHGPRGLILFDWLRQVDUHVXEMHFWWRUHYLHZDQGDSSURYDOE\6RXUFHZHOODQGZLOOQRWDXWRPDWLFDOO\EHLQFOXGHGLQWKH&RQWUDFW 'R\RXKDYHH[FHSWLRQVRUPRGLILFDWLRQVWRSURSRVH" $FNQRZOHGJHPHQW

<HV
1R
'RFXPHQWV
(QVXUH\RXUVXEPLVVLRQGRFXPHQW
V
FRQIRUPVWRWKHIROORZLQJ

'RFXPHQWVLQ3')IRUPDWDUHSUHIHUUHG'RFXPHQWVLQ:RUG([FHORUFRPSDWLEOHIRUPDWVPD\DOVREHSURYLGHG 'RFXPHQWVVKRXOG127KDYHDVHFXULW\SDVVZRUGDV6RXUFHZHOOPD\QRWEHDEOHWRRSHQWKHILOH,WLV\RXUVROHUHVSRQVLELOLW\WRHQVXUHWKDWWKHXSORDGHGGRFXPHQW V
DUHQRWHLWKHU
GHIHFWLYHFRUUXSWHGRUEODQNDQGWKDWWKHGRFXPHQWVFDQEHRSHQHGDQGYLHZHGE\6RXUFHZHOO 6RXUFHZHOOPD\UHMHFWDQ\UHVSRQVHZKHUHDQ\GRFXPHQW V
FDQQRWEHRSHQHGDQGYLHZHGE\6RXUFHZHOO
,I\RXQHHGWRXSORDGPRUHWKDQRQH

GRFXPHQWIRUDVLQJOHLWHP\RXVKRXOGFRPELQHWKHGRFXPHQWVLQWRRQH]LSSHGILOH,IWKH]LSSHGILOHFRQWDLQVPRUHWKDQRQH 
GRFXPHQW
HQVXUHHDFKGRFXPHQWLVQDPHGLQUHODWLRQWRWKHVXEPLVVLRQIRUPDWLWHPUHVSRQGLQJWR)RUH[DPSOHLIUHVSRQGLQJWRWKH0DUNHWLQJ3ODQFDWHJRU\VDYHWKHGRFXPHQWDV³0DUNHWLQJ3ODQ´ 3ULFLQJ1$)*3ULFH)LOH]LS:HGQHVGD\0DUFK 

)LQDQFLDO6WUHQJWKDQG6WDELOLW\)LQDQFLDO6WUHQJWKDQG0DUNHW6WDELOLW\]LS7XHVGD\0DUFK 

0DUNHWLQJ3ODQ6DPSOHV1$)*0DUNHWLQJ3ODQ]LS7XHVGD\0DUFK 

:0%(0%(6%(RU5HODWHG&HUWLILFDWHV,QVXUDQFHDQG5HDOWHG&HUWLILFDWHG]LS7XHVGD\0DUFK 

:DUUDQW\,QIRUPDWLRQ:DUUDQW\,QIRUPDWLRQ]LS7XHVGD\0DUFK 

6WDQGDUG7UDQVDFWLRQ'RFXPHQW6DPSOHV6WDQGDUG7UDQVDFWLRQ'RFXPHQW]LS:HGQHVGD\0DUFK 

5HTXHVWHG([FHSWLRQV

RSWLRQDO

8SORDG$GGLWLRQDO'RFXPHQW8SORDGHG$//0$18)$&785('02'(/ VDQG(/(&7,5&63(&
V]LS:HGQHVGD\0DUFK


Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1617
$GGHQGD7HUPVDQG&RQGLWLRQV
352326(5$)),'$9,7$1'$6685$1&(2)&203/,$1&(
,FHUWLI\WKDW,DPWKHDXWKRUL]HGUHSUHVHQWDWLYHRIWKH3URSRVHUVXEPLWWLQJWKHIRUHJRLQJ3URSRVDOZLWKWKHOHJDODXWKRULW\WRELQGWKH3URSRVHUWRWKLV$IILGDYLWDQG$VVXUDQFHRI&RPSOLDQFH

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
DQGWKH3URSRVHUKDVQRWWDNHQDQ\DFWLRQLQUHVWUDLQWRIIUHHWUDGHRUFRPSHWLWLYHQHVVLQFRQQHFWLRQZLWKWKLVVROLFLWDWLRQ$GGLWLRQDOO\LI3URSRVHUKDVZRUNHGZLWKD FRQVXOWDQWRQWKH3URSRVDOWKHFRQVXOWDQW
DQLQGLYLGXDORUDFRPSDQ\
KDVQRWDVVLVWHGDQ\RWKHUHQWLW\WKDWKDVVXEPLWWHGRUZLOOVXEPLWDSURSRVDOIRUWKLVVROLFLWDWLRQ  7RWKHEHVWRILWVNQRZOHGJHDQGEHOLHIDQGH[FHSWDVRWKHUZLVHGLVFORVHGLQWKH3URSRVDOWKHUHDUHQRUHOHYDQWIDFWVRUFLUFXPVWDQFHVZKLFKFRXOGJLYHULVHWRDQRUJDQL]DWLRQDO FRQIOLFWRILQWHUHVW$QRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVWH[LVWVZKHQDYHQGRUKDVDQXQIDLUFRPSHWLWLYHDGYDQWDJHRUWKHYHQGRU¶VREMHFWLYLW\LQSHUIRUPLQJWKHFRQWUDFWLVRUPLJKWEH LPSDLUHG
 7KHFRQWHQWVRIWKH3URSRVDOKDYHQRWEHHQFRPPXQLFDWHGE\WKH3URSRVHURULWVHPSOR\HHVRUDJHQWVWRDQ\SHUVRQQRWDQHPSOR\HHRUOHJDOO\DXWKRUL]HGDJHQWRIWKH3URSRVHUDQG ZLOOQRWEHFRPPXQLFDWHGWRDQ\VXFKSHUVRQVSULRUWR'XH'DWHRIWKLVVROLFLWDWLRQ  ,IDZDUGHGDFRQWUDFWWKH3URSRVHUZLOOSURYLGHWR6RXUFHZHOO3DUWLFLSDWLQJ(QWLWLHVWKHHTXLSPHQWSURGXFWVDQGVHUYLFHVLQDFFRUGDQFHZLWKWKHWHUPVFRQGLWLRQVDQGVFRSHRID UHVXOWLQJFRQWUDFW
 7KH3URSRVHUSRVVHVVHVRUZLOOSRVVHVVEHIRUHGHOLYHULQJDQ\HTXLSPHQWSURGXFWVRUVHUYLFHVDOODSSOLFDEOHOLFHQVHVRUFHUWLILFDWLRQVQHFHVVDU\WRGHOLYHUVXFKHTXLSPHQWSURGXFWV RUVHUYLFHVXQGHUDQ\UHVXOWLQJFRQWUDFW
 7KH3URSRVHUDJUHHVWRGHOLYHUHTXLSPHQWSURGXFWVDQGVHUYLFHVWKURXJKYDOLGFRQWUDFWVSXUFKDVHRUGHUVRUPHDQVWKDWDUHDFFHSWDEOHWR6RXUFHZHOO0HPEHUV8QOHVVRWKHUZLVH DJUHHGWRWKH3URSRVHUPXVWSURYLGHRQO\QHZDQGILUVWTXDOLW\SURGXFWVDQGUHODWHGVHUYLFHVWR6RXUFHZHOO0HPEHUVXQGHUDQDZDUGHG&RQWUDFW

 7KH3URSRVHUZLOOFRPSO\ZLWKDOODSSOLFDEOHSURYLVLRQVRIIHGHUDOVWDWHDQGORFDOODZVUHJXODWLRQVUXOHVDQGRUGHUV  7KH3URSRVHUXQGHUVWDQGVWKDW6RXUFHZHOOZLOOUHMHFW5)3SURSRVDOVWKDWDUHPDUNHGFRQILGHQWLDO RUQRQSXEOLFHWF
HLWKHUVXEVWDQWLDOO\RULQWKHLUHQWLUHW\8QGHU0LQQHVRWD 6WDWXWHV6HFWLRQ
VXEGLYLVLRQDOOSURSRVDOVDUHFRQVLGHUHGQRQSXEOLFGDWDXQWLOWKHHYDOXDWLRQLVFRPSOHWHDQGD&RQWUDFWLVDZDUGHG$WWKDWSRLQWSURSRVDOVEHFRPHSXEOLF GDWD0LQQHVRWD6WDWXWHV6HFWLRQSHUPLWVRQO\FHUWDLQQDUURZO\GHILQHGGDWDWREHFRQVLGHUHGDWUDGHVHFUHWDQGWKXVQRQSXEOLFGDWDXQGHU0LQQHVRWD V'DWD3UDFWLFHV$FW
 3URSRVHULWVHPSOR\HHVDJHQWVDQGVXEFRQWUDFWRUVDUHQRW

 ,QFOXGHGRQWKH³6SHFLDOO\'HVLJQDWHG1DWLRQDOVDQG%ORFNHG3HUVRQV´OLVWPDLQWDLQHGE\WKH2IILFHRI)RUHLJQ$VVHWV&RQWURORIWKH8QLWHG6WDWHV'HSDUWPHQWRIWKH7UHDVXU\ IRXQGDW
KWWSV
ZZZWUHDVXU\JRYRIDFGRZQORDGVVGQOLVWSGI

 ,QFOXGHGRQWKHJRYHUQPHQWZLGHH[FOXVLRQVOLVWVLQWKH8QLWHG6WDWHV6\VWHPIRU$ZDUG0DQDJHPHQWIRXQGDW KWWSV
VDPJRY6$0
RU
 3UHVHQWO\GHEDUUHGVXVSHQGHGSURSRVHGIRUGHEDUPHQWGHFODUHGLQHOLJLEOHRUYROXQWDULO\H[FOXGHGIURPSURJUDPVRSHUDWHGE\WKH6WDWHRI0LQQHVRWD WKH8QLWHG6WDWHVIHGHUDO
JRYHUQPHQWRUWKH&DQDGLDQJRYHUQPHQWDVDSSOLFDEOH
RUDQ\3DUWLFLSDWLQJ(QWLW\9HQGRUFHUWLILHVDQGZDUUDQWVWKDWQHLWKHULWQRULWVSULQFLSDOVKDYHEHHQFRQYLFWHGRIDFULPLQDO RIIHQVHUHODWHGWRWKHVXEMHFWPDWWHURIWKLVVROLFLWDWLRQ %\FKHFNLQJWKLVER[,DFNQRZOHGJHWKDW,DPERXQGE\WKHWHUPVRIWKH3URSRVHU¶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
7KH%LGGHUDFNQRZOHGJHVDQGDJUHHVWKDWWKHDGGHQGXPDGGHQGDEHORZIRUPSDUWRIWKH%LG'RFXPHQW &KHFNWKHER[LQWKHFROXPQ,KDYHUHYLHZHGWKLVDGGHQGXPEHORZWRDFNQRZOHGJHHDFKRIWKHDGGHQGD Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1618
)LOH1DPH
,KDYHUHYLHZHGWKH
EHORZDGGHQGXPDQG
DWWDFKPHQWV
LI

DSSOLFDEOH

3DJHV
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
7KX0DUFK
$0 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
:HG0DUFK
30 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
0RQ0DUFK
30 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
:HG0DUFK

$0 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
:HG)HEUXDU\
30 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
:HG)HEUXDU\
30 
$GGHQGXPBB&ODVV&KDVVLVDQG&DEVB5)3B
7KX)HEUXDU\
30 
Bid Number: RFP 032824 Vendor Name: 72 HOUR LLC


   






Packet Page. 1619

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Approval of a State-Reimbursed Encampment Delegated Maintenance Agreement with Caltrans for Homeless
Encampment Cleanup within State Right-of-Way (All
Wards)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California adopt Resolution 2026-065:

1. Authorizing the City to enter into an Encampment Delegated Maintenance Agreement with the California Department of Transportation (Caltrans) for a one-year pilot program in an amount not to exceed $400,000, to perform encampment abatement, debris removal, and related services within State right-of-way; and

2. Authorizing the City Manager or designee to execute the Agreement and any necessary documents with Caltrans to implement the program. Also authorizing the City Manager to amend the agreement as required by Caltrans and report back to City Council; and

3. Authorizing the Director of Finance and Management Services to appropriate $400,000 to the Operations and Maintenance budget, to be expended and subsequently reimbursed by the State subject to the terms of the Agreement.

City Manager's Comments
The City Manager recommends approval by the City Council of Encampment Delegated Maintenance Agreement and authorize City Manager to make any minor amendments as required by Caltrans and report back to City Council.

Executive Summary
Packet Page. 1620
The City of San Bernardino has the opportunity to enter into a Delegated Maintenance Agreement with Caltrans that authorizes the City to remove homeless encampments, litter, and debris along State freeway corridors within City limits. This Agreement aligns with recent statewide efforts led by the Governor to address unsafe encampments and streamline coordination between local jurisdictions and the State.

Under this Agreement, the City will perform maintenance and encampment abatement services within designated State right-of-way areas, while also coordinating outreach efforts to connect individuals experiencing homelessness with shelter and supportive services. The State will reimburse the City for up to $400,000 in eligible costs, resulting in no net financial impact to the City’s General Fund.

Background
Homeless encampments along freeway corridors have become a growing concern across California, presenting significant public health, safety, and environmental challenges. Historically, jurisdictional limitations between local agencies and Caltrans have created inefficiencies in addressing encampments located on State property.

To address these challenges, the State has developed a framework through Maintenance Policy Directive (MPD) 1001 R1 to standardize encampment response efforts and allow for delegated maintenance agreements with local agencies. These agreements enable cities to take a more active role in addressing encampments within State right-of-way.

The agreement also establishes procedures for prioritizing encampments based on risk levels, coordinating outreach efforts, and ensuring compliance with State and Federal regulations.

Discussion
The proposed agreement between the City of San Bernardino and Caltrans (Agreement No. DMA-08-26-CN38) authorizes the City to perform encampment removal, litter abatement, and graffiti removal along several key freeway corridors, including Interstate 10, Interstate 215, State Route 210, and other designated routes within City limits.

The agreement authorizes the City to remove both Priority Level 1 encampments, which pose an immediate threat to life, health, safety, or infrastructure, and Priority Level 2 encampments, in accordance with State guidelines. In conjunction with these efforts, the City will coordinate outreach activities to connect individuals experiencing homelessness with available shelter and housing resources prior to encampment removal whenever feasible.

The scope of work includes the removal of encampments, as well as litter, debris, and graffiti within designated State right-of-way areas. To support field operations, the City intends to utilize the Center for Employment Opportunities (CEO), which will provide workforce assistance while also creating employment opportunities for individuals rePacket Page. 1621 entering the workforce.

The State will reimburse the City for actual costs incurred under the agreement, up to a maximum amount of $400,000, with quarterly reimbursement limits of $50,000 in place, unless otherwise approved. Implementation of the program will require coordination with Caltrans and the California Highway Patrol to ensure proper scheduling, adherence to safety requirements, and appropriate traffic control during operations. Reimbursement is based on documented expenses submitted through quarterly invoicing and must comply with Caltrans requirements.

The primary categories of eligible reimbursable costs include:

Cost Category Description
Labor Costs Staff time associated with encampment abatement, cleanup operations, outreach coordination, and supervision
Contracted Services Services provided by third-party vendors, including the Center for Employment Opportunities (CEO)
Equipment and
Supplies
Tools, personal protective equipment (PPE), materials, and operational supplies necessary to perform maintenance
services
Disposal Costs Fees associated with the legal disposal of trash, debris, and encampment materials at authorized facilities
Hazardous Material
Handling
Costs related to the identification, handling, and disposal of hazardous waste encountered during operations
Traffic Control and
Safety
Costs associated with traffic control measures, lane closures, signage, and coordination with law enforcement agencies Documentation and
Reporting
Administrative costs related to required reporting, including before-and-after documentation and compliance tracking
All reimbursement requests must include detailed supporting documentation, including dates of service, locations, labor hours, receipts, and photographic evidence, in accordance with Caltrans billing requirements. Additionally, the City must comply with all applicable State requirements, including the storage of personal property for a minimum of 60 days, proper handling and disposal of hazardous materials, adherence to worker safety and labor compliance standards, and thorough documentation and reporting of all activities, including the submission of before-andafter photographs. 2021-2025 Strategic Targets and Goals
The agreement also supports the City’s Quality of Life goals by improving cleanliness and environmental conditions throughout key transportation corridors. The removal of debris, litter, and graffiti within State right-of-way contributes to a cleaner, more maintained urban environment, which benefits residents, businesses, and visitors while enhancing overall community perception.

Packet Page. 1622
Fiscal Impact
The impact to the General Fund is $400,000. Eligible expenditures will be reimbursed by the State of California on a quarterly basis, not to exceed $400,000, in accordance with the terms of the Agreement.

Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California adopt Resolution 2026-065:

1. Authorizing the City to enter into an Encampment Delegated Maintenance Agreement with the California Department of Transportation (Caltrans) for a one-year pilot program in an amount not to exceed $400,000, to perform encampment abatement, debris removal, and related services within State right-of-way; and

2. Authorizing the City Manager or designee to execute the agreement and any necessary documents with Caltrans to implement the program; and

3. Authorizing the Director of Finance and Management Services to appropriate $400,000 to the Operations and Maintenance budget, to be expended and subsequently reimbursed by the State subject to the terms of the Agreement.

Attachments
Attachment 1 – Resolution 2026-065
Attachment 2 – Delegated Maintenance Agreement California Department of Transportation
Ward:

All Wards
Synopsis of Previous Council Actions:

N/A
CC
Eric Levitt, City Manager
Packet Page. 1623
Resolution No. 2026-065
Resolution No. 2026-065
June 3, 2026

Page 1 of 4 ends

RESOLUTION NO. 2026-065

RESOLUTION OF THE MAYOR AND CITY COUNCIL OF
THE CITY OF SAN BERNARDINO, CALIFORNIA; (1)

AUTHORIZING THE CITY TO ENTER INTO AN

ENCAMPMENT DELEGATED MAINTENANCE

AGREEMENT WITH THE CALIFORNIA DEPARTMENT

OF TRANSPORTATION (CALTRANS) FOR A ONE-YEAR

PILOT PROGRAM IN AN AMOUNT NOT TO EXCEED
$400,000 TO PERFORM ENCAMPMENT ABATEMENT,

DEBRIS REMOVAL, AND RELATED SERVICES WITHIN
STATE RIGHT-OF-WAY; (2) AUTHORIZING THE CITY

MANAGER OR DESIGNEE TO EXECUTE THE

AGREEMENT AND ANY NECESSARY DOCUMENTS
WITH CALTRANS TO IMPLEMENT THE PROGRAM;
AND (3) AUTHORIZING THE DIRECTOR OF
MANAGEMENT SERVICES TO APPROPRIATE $400,000

TO THE OPERATIONS AND MAINTENANCE BUDGET,

TO BE EXPENDED AND SUBSEQUENTLY REIMBURSED

BY THE STATE SUBJECT TO THE TERMS OF THE

AGREEMENT
WHEREAS, homeless encampments located within State right-of-way present ongoing public health, safety, and environmental concerns; and
WHEREAS, the California Department of Transportation (Caltrans) has established a framework to allow local agencies to perform encampment abatement and maintenance services within State right-of-way through delegated maintenance agreements; and WHEREAS, the City of San Bernardino desires to enter into an Encampment Delegated Maintenance Agreement with Caltrans to improve response times, enhance coordination, and address unsafe and unsanitary conditions along freeway corridors within the City; and WHEREAS, the proposed agreement authorizes the City to perform encampment abatement, debris removal, and related services within designated State right-of-way locations; and
WHEREAS, the State of California will reimburse the City for eligible costs incurred under the Encampment Delegated Maintenance Agreement in an amount not to exceed $400,000, with reimbursement generally limited to $50,000 per quarter unless otherwise approved in writing by Caltrans; and
WHEREAS, the City will utilize existing operational resources and workforce support, including the Center for Employment Opportunities, to carry out the services outlined in the agreement; and
Packet Page. 1624
Resolution No. 2026-065
Resolution No. 2026-065
June 3, 2026

Page 2 of 4 ends

WHEREAS, it is necessary to appropriate funds to the Operations and Maintenance budget to allow for the upfront expenditure of costs prior to reimbursement by the State.

BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS:

SECTION 1. The Mayor and City Council hereby authorize the City to enter into an Encampment Delegated Maintenance Agreement with the California Department of Transportation (Caltrans) for a one-year pilot program in an amount not to exceed $400,000, to perform encampment abatement, debris removal, and related services within State right-of-way.

SECTION 2. The Mayor and City Council hereby authorize the City Manager or designee to execute the agreement and any necessary documents with Caltrans to implement the program.

SECTION 3. The Mayor and City Council hereby authorize the Director of Finance Management Services to appropriate $400,000 from the general fund to the Operations and Maintenance budget, to be expended and subsequently reimbursed by the State subject to the terms of the Agreement.

SECTION 4. CEQA. The Mayor and City Council finds this Resolution is not subject to the California Environmental Quality Act (CEQA) in that the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty, as in this case, that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

SECTION 5. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held to be invalid, such invalidity shall not affect other provisions or applications of the Resolution that can be given effect without the invalid provision or application.

SECTION 6. Effective Date. This Resolution shall become effective immediately upon adoption.

APPROVED and ADOPTED by the City Council and signed by the Mayor and attested by the City Clerk this 3
rd day of June 2026.

Helen Tran, Mayor
City of San Bernardino
Packet Page. 1625
Resolution No. 2026-065
Resolution No. 2026-065
June 3, 2026

Page 3 of 4 ends

Attest:

Telicia Lopez, CMC, City Clerk
Approved as to form:

Sonia Carvalho, City Attorney
Packet Page. 1626
Resolution No. 2026-065
Resolution No. 2026-065
June 3, 2026

Page 4 of 4 ends

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO) ss

CITY OF SAN BERNARDINO )
I, Telicia Lopez, CMC, City Clerk, hereby certify that the attached is a true copy of Resolution No. 2026-065, adopted at a regular meeting held on the 3 rd day of June 2026 by the
following vote:

Council Members: AYES NAYS ABSTAIN ABSENT
SANCHEZ _____ _____ _______ _______
IBARRA _____ _____ _______ _______
FIGUEROA _____ _____ _______ _______
SHORETT _____ _____ _______ _______
KNAUS _____ _____ _______ _______
FLORES _____ _____ _______ _______
ORTIZ _____ _____ _______ _______
WITNESS my hand and official seal of the City of San Bernardino this __day of June 2026.

Telicia Lopez, CMC, City Clerk
Packet Page. 1627
Packet Page. 1628
Packet Page. 1629
Packet Page. 1630
Packet Page. 1631
Packet Page. 1632
Packet Page. 1633
Packet Page. 1634
Packet Page. 1635
Packet Page. 1636
Packet Page. 1637
Packet Page. 1638
Packet Page. 1639
Packet Page. 1640
Packet Page. 1641
Packet Page. 1642
Packet Page. 1643
Packet Page. 1644
Packet Page. 1645
Packet Page. 1646
Packet Page. 1647
Packet Page. 1648
Packet Page. 1649

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Approve a Vendor Services Agreement with West Coast Netting for Driving Range Repair services at the Shandin Hills Golf Course in an amount not to exceed $244,593
(Ward 5)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Authorize the City Manager to execute a Vendor Services agreement with West Coast Netting for Driving Range Repair services at the Shandin Hills Golf Course in an amount not to exceed $244,593 and

2. Authorize an additional contingency budget of $31,903 for construction management and inspection services for a total project cost of $276,497; and

3. Authorize the City Manager to execute all necessary documents and expend the contingency budget as appropriate.

City Manager's Comments
The budget provides for up to $1 million in improvements to the golf course. The netting project is a critical improvement. The City Manager recommends approval.

Executive Summary
Shandin Hills Golf Course is a significant municipal asset requiring routine maintenance, capital improvements, and dedicated operational management. During a recent inspection, staff identified critical safety and liability concerns regarding the golf course driving range’s aging infrastructure. Specifically, the protective netting is severely damaged, and one wooden support beam has reached the end of its service life.

Staff recommends executing a Vendor Services Agreement with West Coast Netting Packet Page. 1650
to repair all netting panels, broken or loose cables as needed, and to remove and replace the broken wood support beam. Sufficient funding exists in the approved FY 2025-2026 Capital Improvement Program budget for the Shandin Hill Golf Course to cover the costs of these repairs.

Background
The Shandin Hills Golf Course is owned by the City of San Bernardino and consists of three (3) parcels (APNs 0148-011-30; 0148-021-59; 0148-022-06) totaling 112.18 acres and is located at 3380 Little Mountain Drive. The Shandin Hills Golf Course was constructed between 1980 and 1986 and consists of an 18-hole golf course, an 18,409 square foot clubhouse/banquet facility and maintenance facility. The property is designated as Public/Commercial Recreational (“PCR”) on both the General Plan Land Use Map and on the Zoning Map.

The property was originally built by Warner Hodgdon, a prominent San Bernardino developer, and subsequently gifted to the former San Bernardino Redevelopment Agency (“Agency”). The Agency acquired the property in order to meet the revitalization goals of the City and to alleviate the existence and spread of physical and economic blight throughout the City. The original deed included a “reverter provision” stating that if the property ceased to be used as a golf course, ownership would revert to the original owners or their successors. In 1985, the Agency and the Hodgdons entered into an Agreement that included a section stating that the City would like the reverter provision removed via a quitclaim deed to the Agency effectively canceling all reverter rights. A quitclaim deed was subsequently recorded in 1985.

In 2015, subsequent to the approval of the Long Range Property Management Plan, the Shandin Hills Golf Course was transferred from the Successor Agency to the City.

As the property owner, the City is responsible for the long-term stewardship of the site's major infrastructure. City staff regularly evaluates the condition of these assets to identify and address deferred maintenance, ensuring that the facility remains a safe and viable recreational resource for the community.

Discussion
Shandin Hills Golf Course is a significant municipal asset requiring routine maintenance, capital improvements, and dedicated operational management.

Following the successful mitigation of safety risks during the recent sewer line replacement, Public Works and Parks leadership conducted a follow-up safety audit of high-use facilities. This inspection revealed that deferred maintenance at the driving range has reached a critical failure point; specifically, the protective netting is severely damaged and a wooden support post has reached the end of its service life. Given that safety and liability are paramount in managing City-owned assets, these findings represent an immediate risk requiring urgent intervention.

Project Overview and Necessity
The proposed Agreement with West Coast Netting includes a total not to exceed amount of $244,583 (including a fifteen percent contingency), provides for the critical Packet Page. 1651
restoration of the driving range’s safety infrastructure. In addition, staff recommend authorization an additional contingency budget of $31,903 for specialized construction management and inspection services for total project of $276,497. As part of their scope of work, West Coast Netting will perform the following:
• Removal and replacement of a broken wooden support beam on the left side of the range.
• Comprehensive replacement of all netting panels with new, UV-treated golf netting.
• Repair of all broken or loose cables and handle the offsite disposal of damaged materials.

This work is an operational necessity. The broken pole and degraded netting currently compromise the facility's ability to contain golf balls within the property, creating a significant liability and safety risk to customers on the facility, nearby homes, and the adjacent public freeway. By replacing the entire netting system rather than performing localized repairs, the City ensures a longer asset life-cycle and reduces the likelihood of further emergency repairs in the near future. Beyond safety, these repairs are vital to maintaining the driving range as a functional city asset; failing to act now would likely result in further degradation of the facility, leading to service interruptions and a loss of recreational revenue.

Procurement and Compliance
Due to the urgent nature of the driving range netting repairs and the critical need to mitigate immediate liability, staff bypassed a formal RFP process. Three quotes were solicited, and two were successfully received and evaluated. Staff recommend selecting West Coast Netting, which allows the City to expedite the timeline and address the most high-risk areas immediately.

Firm Name Original Fee Proposal
West Coast Netting $198,000
Judge Netting $198,700
The Agreement with West Coast Netting is being brought forward for the Mayor and City Council’s approval in accordance with Section 3.04.010 D.3. of the City’s Municipal Code (Attachment 2) and Section V (e) of the City’s Purchasing Policy (Attachment 3).

As outlined in both the Municipal Code and Purchasing Policy, a purchase that is otherwise approved by the action of the Mayor and City Council in a public meeting is exempt from the City’s Purchasing Policy.

Emergency Sewer Line Repair Project
In early April 2026, a critical sewer main failure at the golf course restrooms prompted emergency repairs to resolve safety and liability risks. Because the fragile cast-iron pipes were underground, the contractor had to cut through and excavate concrete Packet Page. 1652
floors inside the men's restroom and a nearby outdoor alleyway. The crew successfully cleared the blockage, structurally sealed 35 feet of the main line with a protective lining, and completely replaced a failing pipe section near the grease traps before patching the concrete. Following the contractor’s structural repairs, internal facilities staff completed the project by reinstalling the restroom floor tile. The emergency services, materials, and restoration totaled $22,670.80
2021-2025 Strategic Targets and Goals
Approval of a Vendor Services Agreement with West Coast Netting for driving range repair services aligns with Key Strategic Goal 3: Improved Quality of Life - Constantly evaluate public safety service delivery models to enhance the quality of service.

Fiscal Impact
There is no additional fiscal impact associated with this item. $1,000,000 has already been budgeted in Fiscal Year 2025-2026 Capital Improvement Project funds specifically for the Shandin Hills Golf Couse. A breakdown of this specific CIP budget is below:

Description Amount
CIP Budget Allocation $1,000,000
Sewer Line Replacement Project ($22,670.80)
Driving Range Repair Agreement with West Coast Netting ($244,593) Driving Range Repair Project Additional Contingency
(Specialized Construction Management & Inspection Services) ($31,903)
Remaining Budget $700,832.20
Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Authorize the City Manager to execute an agreement with West Coast Netting for Driving Range Repair services at the Shandin Hills Golf Course in an amount not to exceed $244,593, and

2. Authorize an additional contingency budget of $31,903 for construction management and inspection services for a total project cost of $276,497; and

3. Authorize the City Manager to execute all necessary documents and expend the contingency budget as appropriate.

Attachments
Attachment 1 Vendor Services Agreement – West Coast Netting Attachment 2 Quote
Attachment 3 Original Deed
Packet Page. 1653
Attachment 4 Quitclaim
Ward: 5
Synopsis of Previous Council Actions:

N/A
CC: Eric Levitt, City Manager
Packet Page. 1654
1 VENDOR SERVICES AGREEMENT

BETWEEN THE CITY OF SAN BERNARDINO

AND WEST COAST NETTING
This Agreement is made and entered into as of June 3, 2026 (“Effective Date”) by and between the City of San Bernardino, a charter city and municipal corporation organized and operating under the laws of the State of California with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, CA 92401 (“City”), and WEST COAST NETTING a Corporation with its principal place of business at 5075 Flightline Dr., Kingman, AZ 86401 (hereinafter referred to as “Consultant”). City and Consultant are hereinafter sometimes referred to individually as “Party” and collectively as the “Parties.”

RECITALS
A. City is a public agency of the State of California and is in need of vendor services for the following project:

DRIVING RANGE REPAIR PROJECT (hereinafter referred to as “the Project”).

B. Consultant is duly licensed and has the necessary qualifications to provide such services.

C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.

NOW, THEREFORE, IT IS AGREED AS FOLLOWS:

AGREEMENT

1. Incorporation of Recitals. The recitals above are true and correct and are hereby incorporated herein by this reference.

2. Services. Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit “A.”

3. Vendor Practices. All vendor services to be provided by Consultant pursuant to this Agreement shall be provided by personnel identified in their proposal.

Consultant warrants that Consultant is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant’s performance of this Agreement. Consultant further represents that no City employee will provide any services under this Agreement.

4. Compensation.
a. Subject to paragraph 4(b) below, the City shall pay for such services in accordance with the Schedule of Charges set forth in Exhibit “A.” TOTAL OF $212, 690.00; $198,000 All WORK ABOVE PREVAILING WAGE, $5,940 PERFORMANCE BOND, $8,750 SALES TAX, CONTINGENCY NOT TO EXCEED $31,903 Packet Page. 1655
2 b. In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of $244,593.00 This amount is to cover all related costs, and the City will not pay any additional fees for printing expenses.

Consultant may submit invoices to City for approval. Said invoice shall be based on the total of all Consultant’s services which have been completed to City’s sole satisfaction.

City shall pay Consultant’s invoice within forty-five (45) days from the date City receives said invoice. The invoice shall describe in detail the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as “Additional Services” and shall identify the number of the authorized change order, where applicable, on all invoices.

5. Additional Work. If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.

6. Term. This Agreement shall commence on the Effective Date and continue through November 1, 2026, unless the Agreement is previously terminated as provided for herein (“Term”).

7. Maintenance of Records; Audits.
a. Records of Consultant’s services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City for inspection and/or audit at mutually convenient times for a period of four (4) years from the Effective Date.
b. Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable times during the contract period and for four (4) years from the date of final payment under the contract for inspection by City.

8. Time of Performance. Consultant shall perform its services in a prompt and timely manner and shall commence performance upon receipt of written notice from the City to proceed. Consultant shall complete the services required hereunder within Term.

9. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing Party. For purposes of this Agreement, such circumstances include a Force Majeure Event. A Force Majeure Event shall mean an event that materially affects the Consultant’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the project site; (2) terrorism or other Packet Page. 1656
3 acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the services); and (4) pandemics, epidemics or quarantine restrictions. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety. b. Should a Force Majeure Event occur, the non-performing Party shall, within a reasonable time of being prevented from performing, give written notice to the other Party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement. Delays shall not entitle Consultant to any additional compensation regardless of the Party responsible for the delay.
c. Notwithstanding the foregoing, the City may still terminate this Agreement in accordance with the termination provisions of this Agreement.

10. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including Cal/OSHA requirements.
b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies.
c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.

11. Standard of Care. Consultant’s services will be performed in accordance with generally accepted practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the industry currently practicing under similar conditions. Consultant’s performance shall conform in all material respects to the requirements of the Scope of Work.

12. Conflicts of Interest. During the term of this Agreement, Consultant shall at all times maintain a duty of loyalty and a fiduciary duty to the City and shall not accept payment from or employment with any person or entity which will constitute a conflict of interest with the City.

13. City Business Certificate. Consultant shall, prior to execution of this Agreement, obtain and maintain during the term of this Agreement a valid business registration certificate from the City pursuant to Title 5 of the City’s Municipal Code and any and all other licenses, permits, qualifications, insurance, and approvals of whatever nature that are legally required of Consultant to practice his/her profession, skill, or Packet Page. 1657
4 business.

14. Assignment and Subconsultant. Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associates and subconsultants as Consultant may deem appropriate to assist in the performance of services hereunder.

15. Independent Consultant. Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant shall become an employee of City. The work to be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided. Any personnel performing the work governed by this Agreement on behalf of Consultant shall at all times be under Consultant’s exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Agreement and as required by law.

Consultant shall be responsible for all reports and obligations respecting such personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

16. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required under this section. a. Additional Insured
The City of San Bernardino, its officials, officers, employees, agents, and volunteers shall be named as additional insureds on Consultant’s and its subconsultants’ policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents. b. Commercial General Liability
(i) The Consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City.
(ii) Coverage for Commercial General Liability insurance shall be at least as broad as the following:

Insurance Services Office Commercial General Liability
coverage (Occurrence Form CG 00 01) or exact equivalent.

Packet Page. 1658
5 (iii) Commercial General Liability Insurance must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX)
exclusion deleted
(7) Contractual Liability with respect to this Contract (8) Broad Form Property Damage
(9) Independent Consultants Coverage
(iv) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(v) The policy shall give City, its elected and appointed officials, officers, employees, agents, and City-designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage.
(vi) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured.
c. Automobile Liability
(i) At all times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City. (ii) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(iii) The policy shall give City, its elected and appointed officials, officers, employees, agents and City designated volunteers additional insured status. (iv) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention. d. Workers’ Compensation/Employer’s Liability
Packet Page. 1659
6 (i) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this section. e. Professional Liability (Errors and Omissions)
At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein. This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend. f. Privacy/Network Security (Cyber)
At all times during the performance of work under this Agreement, the Designer shall maintain privacy/network security insurance, in a form and with insurance companies acceptable to the City, for: (1) privacy breaches, (2) system breaches, (3) denial or loss of service, and (4) the introduction, implantation or spread of malicious software code.
g. Aviation and/or Drone Liability
At all times during the performance of the work under this Agreement, the Consultant shall maintain Aviation and/or Drone Liability insurance for bodily injury and property damage, in a form and with insurance companies acceptable to the City. h. Minimum Policy Limits Required
(i) The following insurance limits are required for the Agreement:

Combined Single Limit
Packet Page. 1660
7 Commercial General Liability $2,000,000 per occurrence/$4,000,000 aggregate for bodily injury, personal
injury, and property damage
Automobile Liability $1,000,000 per occurrence for bodily injury and property damage
Employer’s Liability $1,000,000 per occurrence
Professional Liability $1,000,000 per claim and aggregate (errors and omissions)
Cyber Liability $1,000,000 per occurrence and
aggregate
Aviation/Drone Liability $1,000,000 per occurrence limit (ii) Defense costs shall be payable in addition to the limits. (iii) Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.
i. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance. j. Policy Provisions Required
(i) Consultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of the premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.

Packet Page. 1661
8 (ii) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Consultant’s policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss. (iii) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three (3) years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement. (iv) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to provide waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law. k. Qualifying Insurers
(i) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements:
(1) Each such policy shall be from a company or
companies with a current A.M. Best's rating of no less than A:VIII and admitted to transact in the business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
l. Additional Insurance Provisions
(i) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including, but not limited to, the provisions concerning indemnification.

Packet Page. 1662
9 (ii) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement. (iii) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (iv) Neither the City nor the City Council, nor any member of the City Council, nor any of the officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement. m. Subconsultant Insurance Requirements. Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this section. Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

17. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel reasonably approved by the City), indemnify and hold the City, its elected and appointed officials, officers, employees, agents, and authorized volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project, or this Agreement, including without limitation the payment of all damages, expert witness fees, attorneys’ fees and other related costs and expenses. This indemnification clause excludes Claims arising from the sole negligence or willful misconduct of the City. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, the City Council, members of the City Council, its employees, or authorized volunteers. Consultant’s indemnification obligation shall survive the expiration or earlier termination of this Agreement. b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code Section 2782.8), then, and only to the extent required by Civil Code Section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to the extent which the Claims arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant in the performance of Packet Page. 1663
10 the services or this Agreement, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

18. California Labor Code Requirements. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, Consultant agrees to fully comply with such Prevailing Wage Laws, if applicable. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subcontractors to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1).

If the Services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such Services must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. This Project may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements.

19. Verification of Employment Eligibility. By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.

20. Laws and Venue. This Agreement shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of San Bernardino, State of California.

21. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days’ written notice to Consultant.

In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or Packet Page. 1664
11 developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled to payment for unperformed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days’ written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant.

22. Attorneys’ Fees. In the event that litigation is brought by any Party in connection with this Agreement, the prevailing Party shall be entitled to recover from the opposing Party all costs and expenses, including reasonable attorneys’ fees, incurred by the prevailing Party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. The costs, salary, and expenses of the City Attorney’s Office in enforcing this Agreement on behalf of the City shall be considered as “attorneys’ fees” for the purposes of this Agreement.

23. Responsibility for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City’s representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant’s services occurs, Consultant shall, at no cost to City, provide all other services necessary to rectify and correct the matter to the sole satisfaction of the City and to participate in any meeting required with regard to the correction.

24. Prohibited Employment. Consultant shall not employ any current employee of City to perform the work under this Agreement while this Agreement is in effect.

25. Costs. Each Party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein.

26. Documents. Except as otherwise provided in “Termination or Abandonment,” above, all original field notes, written reports, Drawings and Specifications and other documents, produced or developed for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City.

Packet Page. 1665
12 27. Organization. Consultant shall assign MIKE HEBERT as Project Manager.

The Project Manager shall not be removed from the Project or reassigned without the prior written consent of the City.

28. Limitation of Agreement. This Agreement is limited to and includes only the work included in the Project described above.

29. Notice. Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to the following addresses and shall be effective upon receipt thereof:

CITY:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: Eric Levitt, City Manager
With Copy To:

City of San Bernardino
Vanir Tower, 290 North D Street
San Bernardino, CA 92401
Attn: City Attorney
CONSULTANT:

DAN KIRKLAND

30. Third Party Rights. Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.

31. Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

32. Entire Agreement. This Agreement, including Exhibit “A,” represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises, or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This is an integrated Agreement.

33. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be invalid, illegal, or unenforceable for any reason, such determination shall not affect the validity or enforceability of the remaining terms and Packet Page. 1666
13 provisions hereof or of the offending provision in any other circumstance, and the remaining provisions of this Agreement shall remain in full force and effect.

34. Successors and Assigns. This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

35. Non-Waiver. The delay or failure of either Party at any time to require performance or compliance by the other Party of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance.

No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the Party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occurrence or event shall not be deemed a waiver of any right or remedy with respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.

36. Time of Essence. Time is of the essence for each and every provision of this Agreement.

37. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain, or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement.

38. Amendments. Only a writing executed by all of the Parties hereto or their respective successors and assigns may amend this Agreement.

39. City’s Right to Employ Other Consultants. City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.

40. Prohibited Interests. Consultant maintains and warrants that it has neither employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

41. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one single Agreement.

Packet Page. 1667
14 42. Authority. The persons executing this Agreement on behalf of the Parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said Parties and that by doing so, the Parties hereto are formally bound to the provisions of this Agreement.

43. Electronic Signatures. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature.
[SIGNATURES ON FOLLOWING PAGE]
Packet Page. 1668
15 SIGNATURE PAGE FOR VENDOR SERVICES AGREEMENT

BETWEEN THE CITY OF SAN BERNARDINO

AND WEST COAST NETTING
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.

CITY OF SAN BERNARDINO
APPROVED BY:

Eric Levitt
City Manager
ATTESTED BY:

Telicia Lopez, CMC
City Clerk
APPROVED AS TO FORM:

Best Best & Krieger LLP
City Attorney

CONSULTANT

WEST COAST NETTING

DAN KIRKLAND
APPROVED BY:

DAN KIRLAND
OWNER
Packet Page. 1669
16 Packet Page. 1670
QUOTATION – QUOTATION - QUOTATION

QUOTATION
DKMH26-442196-P.W.Rev.3

WEST COAST NETTING
5075 FLIGHTLINE DR. TO: Attn:

KINGMAN, AZ 86401 Re:

TOLL FREE: 800-854-5741 Fax/Email:

FAX: 928-692-1501 Phone #:

F.O.B. Terms Date
5/26/2026

QUANTITY
1 1
1 Above Prices Good For: Signature:

VANESSA CARDER

GOLF RANGE NETTING
[email protected]
909-633-1239

SHANDIN HILLS
Excludes: bonds, permits, turf damage, utility damage,
off haul of spoils, Hardrock drilling, hole casing, dewatering inspections, union wages labor, survey, engineering,
Concrete cutting or demo, temporary fencing or facilities

SUB TOTAL
$212,690.00
30 days Dan Kirkland
weekend P.Wage
* S.O.W. = SCOPE OF WORK IE: DON’T NEED PERMIT
BS
TOTAL
NETTING WILL BE OUR HEAVY DUTY W420T
U.V. TREATED WITH PERIMETER BORDER ROPES

REPAIR ALL BROKEN OR LOOSE CABLES AS NEEDED
LOT PRICE FOR ALL WORK ABOVE + PREV. WAGES
PERMORMANCE BOND 3% OF TOTAL JOB PRICE
SALES TAX @ 8.75%
JOB ADDRESS: 3380 LITTLE MOUNTAIN DR 92405
>> SEE GRAPHICS <<<

REMOVE & REPLACE BROKEN WOOD POLE (LEFT SIDE)
$8,750.00
$198,000.00
$5,940.00
$8,750.00
$198,000.00
$5,940.00
T.B.D.

FULL GOLF RANGE NETTING REPLACEMENT
PRICE

PERMITS AND/OR PERMIT FEES NOT INCLUDED
PERMITS LIKELY NOT NEEDED FOR REPAIRS S.O.W.*
Estimated Lead Time
TOTAL
Kingman, AZ T.B.D.

DESCRIPTION
Packet Page. 1671
Packet Page. 1672
Packet Page. 1673
Packet Page. 1674
Packet Page. 1675
Packet Page. 1676
Packet Page. 1677
Packet Page. 1678
Packet Page. 1679
Packet Page. 1680
Packet Page. 1681
Packet Page. 1682
Packet Page. 1683

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Approve Increase to the Contingency Budget in the Amount of $1,300,000 Increasing the Total Contingency
Budget to $2,044,981 for the Speicher Park Ballfields
Project. (Ward 2)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Approve increase to the contingency budget for the Speicher Park Ballfields Project (Project) in the amount of $1,300,000 increasing the total contingency budget amount to $2,044,981; and

2. Authorize the City Manager or designee to expend the contingency fund, if necessary, to complete the project.

City Manager's Comments
N/A
Executive Summary
To effectively utilize the available funding currently allocated to the Project, staff have negotiated scope revisions to deliver more substantial changes throughout the park ballfields. To carry out the remaining scope revisions, an increase to the total contingency budget is needed to, which would allow the City Manager or designee to execute the remaining change orders.

Background
On June 1, 2022, the Mayor and City Council approved Resolution No. 2022-102 adopting the City's Annual Operating Budget for Fiscal Year 2022/23. The budget Packet Page. 1684
included CIP Project for Speicher Memorial Park Ballfield Improvements ("Project").

Funding to support the Project has been established in the amount of $950,000 from a San Manuel Band of Mission Indians grant and $1,000,000 in American Rescue Plan (ARPA/County) funding, for a total amount of $1,950,000.

On June 26, 2024 the Mayor and City Council adopted the FY 2023/24 amended budget. As part of this adopted budget, $1,300,000 in Measure S funding was allocated to the Project.

On August 7, 2024 the Mayor and City Council adopted resolution 2024-175 approving the award of an agreement with Bilbro Construction Company, Inc. in the amount of $2,915,258.44 for construction of the Project, and approving Task Order Number 001 with TKE Engineering, Inc. in the amount of $415,019 for construction management and inspection services. A contingency budget of $744,981 was also approved. This brought the total approved funding amount to $4,075,258.44.

Discussion
To effectively utilize the available funding for the Project, staff moved forward with a multi-phased project delivery approach. The first construction phase was originally intended to focus on converting the largest and centrally located ballfield to from natural turf to synthetic turf and the renovation of the southern restroom/concession building.

After the project was awarded, City staff met with the contractor to confirm the type of synthetic turf to be used on the project. It was determined that the most suitable turf for the ballfield would incur a higher cost than originally anticipated.

City staff proceeded to discuss transitioning to a multi-field improvement approach that would include improvements to the two southern ballfields in addition to the central ballfield. Over the course of the project various adjustments to the scope and contract cost were negotiated with the contractor to implement the changes. The emphasis would now be to complete natural turf improvements across each of the three ballfields.

Some of the improvements have been authorized through change orders using the previously approved contingency budget.

To authorize the remaining contract change orders necessary to complete the project, an increase to the contingency budget is recommended. The project budget summary below includes the current project costs in addition to the estimate total project change orders.

Additional work included in the project change orders includes, but is not limited to:
• Negotiated Field Overhead Compensation for Removed Bid Items • Negotiated Time Extension Field Overhead Compensation • Additional path of travel improvements
• Additional soil import for Huchabaa Field
• Refurbishment of backstop for Huchabaa Field
• Ramp and handrail improvements
• Lighting conduits
Packet Page. 1685
• Additional restroom/concession building improvements
• Southern field improvements (fencing, sod, grading etc.) Taking into consideration the additional work, the estimate construction completion is July 2026.

Project Budget Summary
County ARPA $950,000.00
San Manuel Endowment $1,000,000.00
Cultural Development Fund $2,574,670.02
Measure S $1,300,000.00
Original Design Services (IDS) ($180,943.00)
Design Services Amendment No. 1 ($248,179.00)
Design Services Amendment No. 2 ($217,626.00)
Original Construction Award (Bilbro) ($2,915,258.44)
Net Approved Change Orders ($1,017,380.59)
Pending Change Orders ($232,033.53)
Anticipated Change Orders (Estimated) ($147,000.00)
Original Construction Management/Inspection Services ($415,019.00) Additional Construction Management/Inspection Services ($200,162.00) Geotechnical Testing Services ($56,297.00)
City Administrative Costs (Estimated) ($25,000.00)
Remaining Budget $169,771.46
The previously allocated Measure S funding ($1,300,000) was not authorized for use at the time of the original construction agreement award on August 7, 2024. To utilize Measure S funding to complete the project a contingency budget increase of $1,300,000 is recommended. This will address current project costs and provide sufficient remaining contingency capacity for unforeseen conditions, additional field adjustments, and other construction-related changes that may arise during completion of the Project. Establishing additional contingency authority at this stage is intended to minimize project delays and reduce the need for subsequent Council actions related to minor construction modifications or unforeseen site conditions.

Proposed Budget
Original Contingency Budget $744,981.00
Proposed Contingency Increase (Measure S) $1,300,000.00 Total Proposed Project Contingency Budget $2,044,981.00 2021-2025 Strategic Targets and Goals
This Project is consistent with Key Target No.4: Economic Growth & Development.

Completion of this Project will improve park assets by providing a renovated Packet Page. 1686
restroom/concession building and improvements to the baseball fields to provide a safe and well-maintained community park.

Fiscal Impact
There is no General Fund impact associated with this item. There is sufficient funding available in the previously approved Measure S funding allocation to cover the cost of the $1,300,000 contingency increase. This action will bring the project contingency budget to $2,044,981.

Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Approve increase to the contingency budget for the Speicher Park Ballfields Project (Project) in the amount of $1,300,000 increasing the total contingency budget amount to $2,044,981; and

2. Authorize the City Manager or designee to expend the contingency fund, if necessary, to complete the project.

Attachments
Attachment 1 Location Map
Ward:

First Ward
Synopsis of Previous Council Actions:

June 1, 2022 Approved Resolution No. 2022-102 adopting the City's Annual Operating Budget for Fiscal Year 2022/23, establishing a CIP project for the Speicher Memorial Park Ballfields Project.

Funding for this project was in the amount of $950,000 from the San Manuel Band of Mission Indians and $1,000,000 from
County ARPA Funds.

June 26, 2024 Adopted the FY 2023/24 amended budget, providing an additional $1,300,000 in Measure S funding.

August 7, 2024 Adopted resolution 2024-175 approving the award of an agreement with Bilbro Construction Company, Inc. in the amount of $2,915,258.44 for construction of the Project, approving Task Order Number 001 with TKE Engineering, Inc. in the amount of $415,019 for construction management and inspection services, and a contingency budget of $744,981
Packet Page. 1687
CC: Eric Levitt, City Manager
Packet Page. 1688
Attachment 1
Speicher Memorial Park
1000 ft
N
➤
Packet Page. 1689

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Azzam Jabsheh, Deputy Director of Public Works/City Engineer Department: Public Works
Subject: Award of Construction Agreement to Estate Design and Construction, Inc. for the Feldheym Library Makerspace
Project in the amount of $238,800 and Contingency of
$36,000 for a Total Amount of $274,800 (Ward 1)
Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Approve the award of a Construction Agreement with Estate Design and Construction, Inc., in the amount of $238,800 for the Feldheym Library Makerspace (Project); and

2. Authorize the construction contingencies, construction management, and administrative costs in the total amount of $36,000 for the Project, bringing the total Project budget to $274,800; and

3. Authorize the City Manager or designee to execute all documents with Estate Design and Construction, Inc.; and

4. Authorize the City Manager or designee to expend the contingency fund, if necessary, to complete the Project.

City Manager's Comments
The City Manager recommends approval
Executive Summary
Awarding this Agreement will allow the City to proceed with the renovations to a room within the Feldheym Library, advancing completion of the previously approved Animakerspace project. The Animakerspace will offer a dynamic environment where Packet Page. 1690
both students and small businesses can thrive. Programming will be designed to address the impact of learning loss for K-12 students (e.g., high-quality tutoring, differentiated instruction) hands-on science, technology, engineering, arts, and math.

Background
On October 2, 2024, the Mayor and City Council adopted Resolution 2024-213 approving the allocation of $1,797,174 in American Rescue Plan Act (ARPA) Funds for a customized library Animakerspace at the Feldheym Library. Of this amount, $1,091,408.59 was awarded to Garner Holt Education Through Imagination, LLC (Garner Holt) for Animakerspace technologies and curriculum development. An Interagency agreement was also approved for the remaining $705,765.36 for staff to implement and oversee the Animakerspace Program.

The inter-agency agreement is consistent with Treasury’s SLFRF Obligation Interim Final Rule and FAQ 17.6. Treasury guidance provides that an inter-agency agreement between departments or agencies within the same government may constitute a valid obligation where the agreement identifies the eligible project, commits SLFRF funding, and requires performance or payment.

Because the obligation occurred prior to the statutory deadline, the recipient may continue carrying out the project during the expenditure period through December 31, 2026, including entering into contracts in 2025 or 2026 that are necessary to implement the previously obligated project. The 2026 contract does not create a new obligation of SLFRF funds; rather, it is a procurement action undertaken to execute and complete an already obligated project.

Discussion
The proposed construction agreement includes the remodeling of a room within the Feldheym Library. The room will be reconfigured to allow for the installation of equipment purchasing from Garner Holt to support the Animakerspace Program.

Equipment to be installed after construction includes a truss lighting system, S.P.A.R.K.E. Animatronics, vacuum former, vinyl printer, heat press, particle/fume filtration system, laser cutter, embroidery machine, spray booth, 3D printer, and other elements to support the programming.

The Project was publicly advertised for competitive bidding through PlanetBids on March 3, 2026, and bids were opened on March 31, 2026. A total of fifteen (17) sealed bids were received.

Bid Summary Table
# NAME OF BIDDER CITY TOTAL BID
1 Estate Design and Construction Culver City, CA $238,800.00 2 All American Building Services Santa Clarita, CA $246,110.00 Packet Page. 1691
3 Earth General Construction Fontana, CA $250,981.79
4 Steady Solutions Westlake Village, CA $274,170.08
5 RS Construction & Development Inc. Ontario, CA $258,966.00 6 Stallworth Construction & Management
Corp. Palmdale, CA $266,225.45
7 YMC First Trade LLC Irvine, CA $268,971.50
8 Prima Cast Construction LLC Anaheim, CA $284,443.40
9 BCM Group Inc. Rancho Cucamonga, CA $315,821.80
10 KNC Construction Inc. Apple Valley, CA $333,598.60
11 NW Building Group Tustin, CA $336,103.00
12 Monet Construction Inc. Tujunga, CA $338,299.05
13 MBE Construction Beaumont, CA $360,050.00
14 Co Brothers Riverside, CA $369,208.00
15 JM Builders Inc. Redlands, CA $384,000.00
16 EDRA Construction Corp. Glendora, CA $402,141.00
17 Blackstone Builders Inc. Riverside, CA $410,292.00
After review, staff determined that Estate Design and Construction, Inc., of Culver City, California, submitted the lowest responsive and responsible bid in the amount of $238,800.00. Staff reviewed the bid documents, CSLB license, and DIR registration, and confirmed that all requirements were met and recommend awarding the construction agreement to Estate Design and Construction, Inc.

In addition to the proposed construction bid cost, staff recommend a construction contingency budget of $36,000. This brings the total construction budget to $274,800.

Proposed Construction Agreement Budget
Construction Bid Amount $238,800.00
Construction Contingency $36,000.00
Total Construction Agreement Budget $274,800.00
The project will utilize a portion of the previously allocated $705,765.36 ARPA funding that was set aside for program implementation.

Project Budget
Packet Page. 1692
Implementation Budget $705,765.36
Construction Agreement Cost ($274,800)
Remaining Budget $430,965.36
2021-2025 Strategic Targets and Goals
This project is consistent with Key Strategic Target and Goal No. 3: Improved Quality of Life – the Animakerspace combines creative learning with entrepreneurial support, offering a dynamic environment where both students and small businesses can thrive.

Fiscal Impact
No general fund impact is associated with this item, The total cost of $274,413.00 will be funded by the previously approved ARPA allocation..

Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Approve the award of a Construction Agreement with Estate Design and Construction, Inc., in the amount of $238,800 for the Feldheym Library Makerspace (Project); and

2. Authorize the construction contingencies, construction management, and administrative costs in the total amount of $36,000 for the Project, bringing the total Project budget to $274,800; and

3. Authorize the City Manager or designee to execute all documents with Estate Design and Construction, Inc.; and

4. Authorize the City Manager or designee to expend the contingency fund, if necessary, to complete the Project.

Attachments
Attachment 1 Construction Agreement with Estate Design and Construction, Inc.

Attachment 2 Bid Tabulation
Attachment 3 Bid Proposal
Attachment 4 Location Map
Ward:

Ward 1
Synopsis of Previous Council Actions:

October 2, 2024, Mayor and City Council Adopted Resolution 2024-213 Approving the allocation of $1,797,174 in American Rescue Packet Page. 1693
Plan Act (ARPA) Funds for a Customized Library
Animakerspace at the Norman F. Feldheym Central Library CC: Eric Levitt, City Manager
Packet Page. 1694
Makerspace Room Remodel -1-
00 52 13 – CONTRACT FOR CONSTRUCTION
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), No. GB25-008 is made and entered into this 3rd day of June, 2026 by and between the CITY OF SAN BERNARDINO , with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, sometimes hereinafter called the “City” and Estate Design and Construction, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:

ARTICLE 1. SCOPE OF WORK.

The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:

Feldheym Library Makerspace Project
Contractor is an independent contractor and not an agent of the City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

ARTICLE 2. TIME FOR COMPLETION.

Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 60 calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

ARTICLE 3. CONTRACT PRICE.

The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of Two Hundred Thirty-Eight Thousand Six Hundred Twenty Dollars ($238,620). Payment shall be made as set forth in the General Conditions. The City will pay to Contractor compensation based upon the prices set forth in the Bid Schedule.

ARTICLE 4. LIQUIDATED DAMAGES.

Contractor acknowledges that the City will sustain actual damages for each and every Day completion of the Project is delayed beyond the Contract Time. Because of the nature of the Project, it would be impracticable or extremely difficult to determine the City’s actual damages.

Accordingly, in accordance with Government Code Section 53069.85, it is agreed that the Contractor will pay the City the sum of $500 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Section does not exclude recovery of other damages specified in the Contract Packet Page. 1695
Makerspace Room Remodel -2-
00 52 13 – CONTRACT FOR CONSTRUCTION
Documents. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case COMPONENT PARTS OF THE CONTRACT.

The “Contract Documents” include the following:

Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised Reference Specifications
Approved and fully executed Change Orders
Permits
Compliance With American Rescue Plan Act (ARPA) Coronavirus Local Fiscal Recovery Fund (CLFRF) Federal Guidelines Use of ARPA CLFRF and Requirements Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. In the event of conflict, the various Contract Documents will be given effect in the order set forth in the General Conditions. This Contract shall supersede any prior agreement of the parties.

ARTICLE 5. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.

Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.

Packet Page. 1696
Makerspace Room Remodel -3-
00 52 13 – CONTRACT FOR CONSTRUCTION
ARTICLE 6. INDEMNIFICATION.

Contractor shall provide indemnification and defense as set forth in the General Conditions.

ARTICLE 7. PREVAILING WAGES.

Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.

ARTICLE 8. FALSE CLAIMS.

Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 1697
Makerspace Room Remodel -4-
00 52 13 – CONTRACT FOR CONSTRUCTION
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

CITY OF SAN BERNARDINO
By:

ERIC LEVITT

CITY MANAGER
ATTEST:

By:

TELICIA LOPEZ, CITY CLERK
APPROVED AS TO FORM:

By:

Best Best & Krieger LLP
City Attorney

ESTATE DESIGN AND CONSTRUCTION,
INC.
[IF CORPORATION, TWO SIGNATURES,

PRESIDENT OR VICE PRESIDENT AND
SECRETARY OR TREASURER REQUIRED]
By:

Its:

Printed Name:
[DELETE THE FOLLOWING SIGNATURE
LINE IF NOT REQUIRED]
By:

Its:

Printed Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
DIR Registration Number
(CONTRACTOR’S SIGNATURE MUST BE

NOTARIZED AND CORPORATE

SEAL AFFIXED, IF APPLICABLE)

END OF CONTRACT
Packet Page. 1698
Makerspace Room Remodel -5-
00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, (hereinafter referred to as the “City”) has awarded to _________________________, (hereinafter referred to as the “Contractor”) an agreement for Contract No._________, (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, ______________________, the undersigned Contractor and ________________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by the City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Packet Page. 1699
Makerspace Room Remodel -6-
00 61 13 – BOND FORMS
Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Packet Page. 1700
Makerspace Room Remodel -7-
00 61 13 – BOND FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges is $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of ___________________________________________ process in California, if different ___________________________________________ from above)
(Telephone number of Surety ___________________________________________ and Agent or Representative for
service of process in California)
Packet Page. 1701
Makerspace Room Remodel -8-
00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

Packet Page. 1702
Makerspace Room Remodel -9-
00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.

END OF PERFORMANCE BOND
Packet Page. 1703
Makerspace Room Remodel -10-
00 61 13 – BOND FORMS
Payment Bond (Labor and Materials).

KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the CITY OF SAN BERNARDINO , with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401 (hereinafter designated as the “City”), by action taken or a resolution passed ___________________ , 20_____, has awarded to ________________________ hereinafter designated as the “Principal,” a contract for the work described as follows: Contract No.____________ (the “Project”); and WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or Packet Page. 1704
Makerspace Room Remodel -11-
00 61 13 – BOND FORMS
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or the City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract to be performed thereunder, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of Contract, including but not limited to, the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Packet Page. 1705
Makerspace Room Remodel -12-
00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

Packet Page. 1706
Makerspace Room Remodel -13-
00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.

END OF PAYMENT BOND
Packet Page. 1707
Makerspace Room Remodel -14-
00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS

1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.

1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale, a tidal wave, or unpredictable natural disaster or event beyond human control that causes significant damage.

2. Addenda -- Written or graphic instruments issued prior to the submission of Bids which clarify, correct, or change the Contract Documents.

3. Additional Work -- New or unforeseen work will be classified as “Additional Work” when the Engineer determines that it is not covered by the Contract.

4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.

5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices and other terms for the Work to be performed.

6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into a written contract.

7. Bidder -- The individual or entity who submits a Bid directly to the City.

8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.

9. Change Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Contract Times as the result of a Contractor-claimed change to the Work. This term may also be referred to as a Change Order Proposal (“COP”), or Request for Change (“RFC”).

10. City’s Representative – The Public Works Director, and acting through properly authorized agents, such as the Engineer or such other agents acting within the scope of the particular duties entrusted to them. Also sometimes referred to as the “City’s Representative” or “Representative” in the Contract Documents. The terms the City and Owner may be used interchangeably
Packet Page. 1708
Makerspace Room Remodel -15-
00 72 00 – GENERAL CONDITIONS

11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.

12. Contract -- The entire integrated written agreement between the City and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.

13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the Contract for Construction. Some documents provided by the City to the Bidders and Contractor, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.

14. Contract Price -- Amount to be paid by the City to the Contractor as full compensation for the performance of the Contract and completion of the Work, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs.

15. Contract Time -- The number of days or the dates stated in the Contract Documents to: achieve defined milestones, if any; and to complete the Work so that it is ready for final payment.

16. Contractor -- The individual or entity with which the City has contracted for performance of the Work.

17. Contractor’s Designated On-Site Representative -- The Contractor’s Designated On-Site Representative will be identified by the Contractor and shall not be changed without prior written consent of the City.

18. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported by documented proof that Contractor made every effort to obtain such materials from all available sources; (b) such shortage is due to the fact that such materials are not physically available from single or multiple sources or could have been obtained only at exorbitant prices entirely inconsistent with current and standard rates taking into account the quantities involved and the usual industry practices in obtaining such quantities; and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated by Contractor at the time it submitted its bid or entered the Contract. Market fluctuations in prices of materials, whether or not resulting from a Force Majeure Event, does not constitute a Critical Supply Shortage.

19. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full compensation to the Contractor due to the City’s unreasonable delay to the Project that was not contemplated by the parties.

20. Day -- A calendar day of twenty four (24) hours measured from midnight to the next midnight.

Packet Page. 1709
Makerspace Room Remodel -16-
00 72 00 – GENERAL CONDITIONS

21. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.

22. Demobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at the Site.

23. Drawings -- That part of the Contract Documents prepared by of the Engineer of Record which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not Drawings as so defined.

24. Effective Date of the Contract -- The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it means the date on which the Contract is signed and delivered by the last of the two parties to sign and deliver.

25. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer authorized to act for and in behalf of the City, acting either directly or through properly authorized agents, such agents acting severally within the scope of the particular duties entrusted to them.

26. Force Majeure Event -- An event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and other organized labor action occurring at the Site and the effects thereof on the Work, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its Subcontractors, of every Tier, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (6) a Critical Supply Shortage. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.

27. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended from time to time, or any substance or material identified as hazardous under any state or federal statute governing handling, disposal and/or cleanup of any such substance or material, whichever is more restrictive.

28. Holiday – Holidays occur on:

New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Packet Page. 1710
Makerspace Room Remodel -17-
00 72 00 – GENERAL CONDITIONS
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both Holidays.

29. Notice of Award -- The written notice by the City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, the City will sign and deliver the Contract.

30. Notice of Completion -- The form which may be executed by the City constituting final acceptance of the Project.

31. Notice to Proceed -- A written notice given by the City to Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Times will commence to run.

32. Project -- The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part.

33. Record Drawings – The record set of as-builts prepared by the Contractor during the Work in accordance with the requirements of the General Conditions.

34. Recyclable Waste Materials -- Materials removed from the Site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include, but are not limited to, asphalt, concrete, brick, concrete block, and rock.

35. Sample -- A physical example furnished by the Contractor to illustrate materials, equipment or workmanship; to establish standards by which the Work will be judged.

36. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to facilitate scheduled performance of related construction activities.

37. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.

38. Site -- Lands or areas indicated in the Contract Documents as being furnished by the City upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the City which are designated for the use of Contractor.

Packet Page. 1711
Makerspace Room Remodel -18-
00 72 00 – GENERAL CONDITIONS

39. Specifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.

40. Stop Payment Notice -- A written notice as defined in Civil Code Section 8044.

41. Subcontractor -- An individual or entity other than a Contractor having a contract with any other entity than the City for performance of any portion of the Work at the Site.

42. Submittal -- Written and graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.

43. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom the City makes an award.

44. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in the Work.

45. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

46. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by the Contractor in its Bid or as adjusted in accordance with the Contract Documents.

47. Warranty -- A guarantee provided to the City by the Contractor that the Work will remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this state, whichever is longer.

48. Work -- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

1.2 Terminology.

A. The words and terms below are not defined but, when used in the Contract Documents, have the indicated meaning.

1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment Packet Page. 1712
Makerspace Room Remodel -19-
00 72 00 – GENERAL CONDITIONS
to the Site (or some other specified location) ready for use or installation and in usable or operable condition.

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use.

3. The words “perform” or “provide,” when used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use.

4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in connection with services, materials, or equipment, an obligation of Contractor is implied.

B. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning.

ARTICLE 2 -PRELIMINARY MATTERS

2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will execute the Contract, the Contractor shall furnish and file with the City a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements, as well as any other documents specified in the Contract Documents.

2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract Documents, duly executed by a responsible corporate surety admitted to transact surety business in the State of California, as defined in Code of Civil Procedure Section 995.120, and listed in the United States Department of the Treasury circular entitled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies," authorized to do business in the State of California and acceptable to the City conditioned upon the faithful performance by the Contractor of all requirements of the Contract Documents. Each of the bonds shall be in a sum no less than one hundred percent (10%) of the Contract Price. Bonds shall be delivered to the City within ten (10) Days after receipt of the Notice of Award and before execution of the Contract by the City.

2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the Notice of Award, the Contractor shall submit or cause to be submitted any and all Certificates of Insurance and Endorsements, showing that the Contractor has the required insurance, to the attention of the City. Such insurance is to be provided at the sole cost and expense of the Contractor. No Work shall be performed until all of the required insurance has been received and approved.

Packet Page. 1713
Makerspace Room Remodel -20-
00 72 00 – GENERAL CONDITIONS

2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract, establishing the Effective Date of the Contract.

2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to the Contractor and award the Contract to the next lowest responsive, responsible bidder as determined by the City. If the City elects to accept bonds and insurance submitted late, the Contract Times will begin to run as of the date stated in the Notice to Proceed. However, the number of days beyond the original ten (10) Days it took to receive the properly executed Contract and related items may be deducted from the Contract Times.

2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.

Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.

The Contract Times begin to run on the date specified in the Notice to Proceed. No Work shall be done at the Site prior to the issuance of the Notice to Proceed.

2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract Documents. Additional copies may be obtained at cost of reproduction. Contractor shall maintain a clean, undamaged set of Contract Documents, including Submittals, at the Project site.

2.8 Substitution Requests, Schedule of Submittals, and Schedule A. Substitution Requests. Within fifteen (15) Days after Notice of Award (unless otherwise specified in the Contract Documents), Contractor shall provide all substitution requests as further described in Section 00 72 00, Article 6.5.

B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents), Contractor shall submit to the City a Schedule of Submittals that conforms with the requirements of Section 00 72 00, Article 5.21.

C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents), the Contractor shall submit a construction schedule that conforms with the requirements of Section 00 72 00, Article 8.2.

2.9 Preconstruction Conference; Designation of Authorized Representatives.

A. Before any Work at the Site is started, a conference attended by the City, Contractor, Engineer, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules Packet Page. 1714
Makerspace Room Remodel -21-
00 72 00 – GENERAL CONDITIONS
referred to herein, procedures for handling Submittals and Shop Drawings, processing applications for payment, and maintaining required records.

B. At this conference the City and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party.

2.10 Subcontractor Mobilization Meeting.

A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the schedule, coordination, procedures, and other administrative issues.

2.11 Authority of Board; Engineer
A. The Board has the final authority in all matters affecting the Work. Within the scope of the Contract, the Engineer has the authority to enforce compliance with the Contract Documents. The Contractor shall promptly comply with instructions from the Engineer.

B. The decision of the Engineer is final and binding on all questions relating to:

1. quantities;

2. acceptability of material, equipment, or work;

3. execution, progress or sequence of work;

4. interpretation of the Plans, Specifications, or other Contract Documents; and

5. Any other areas specifically identified in the Contract Documents or under the law.

C. Compliance with instructions from the Engineer shall be a condition precedent to any payment under the Contract, unless otherwise ordered by the Board.

2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate. When no bid item is provided for mobilization payment for such costs will be deemed to be included in the other items of the Work.

B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall constitute full compensation for all such Work. No payment for mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer. The scope of the Work included under mobilization shall include, but shall not be limited to, the following principal items:

1. Obtaining and paying for all bonds, insurance, and permits.

Packet Page. 1715
Makerspace Room Remodel -22-
00 72 00 – GENERAL CONDITIONS

2. Moving on to the Project Site of all Contractor’s plant and equipment required for the first month’s operations.

3. Installing temporary construction power, wiring, and lighting facilities, as applicable.

4. Establishing fire protection system, as applicable.

5. Developing and installing a construction water supply, as applicable.

6. Providing and maintaining the field office trailers for the Contractor, if necessary, and the Engineer (if specified), complete, with all specified furnishings and utility services.

7. Providing on-site sanitary facilities and potable water facilities as specified per CalOSHA and these Contract Documents.

8. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

9. Arranging for and erection of Contractor’s work and storage yard.

10. Posting all OSHA required notices and establishment of safety programs per CalOSHA.

11. Full-time presence of Contractor’s superintendent at the job Site as required herein.

12. Submittal of construction schedule as required by the Contract Documents.

ARTICLE 3 -CONTRACT DOCUMENTS; INTENT

3.1 Examination of Drawings, Specifications, and Site of Work A. Examination of Contract Documents; Site. Before commencing any portion of the Work, Contractor shall again carefully examine all applicable Contract Documents, the Project Site, and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict, or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any Subcontractor proceed with Work if uncertain as to the applicable requirements.

Packet Page. 1716
Makerspace Room Remodel -23-
00 72 00 – GENERAL CONDITIONS
B. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict, or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.

C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish.

D. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to comply with all Applicable Laws, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be binding as if required by all. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to the City.

B. The Contractor shall furnish, unless otherwise provided in the Contract Documents, all materials, implements, machinery, equipment, tools, supplies and labor necessary to the prosecution and completion of the Project.

C. Clarifications and interpretations of the Contract Documents shall be issued by the Engineer as provided in these General Conditions.

D. If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the Work. The implied Work will conform to the appropriate sections of the Contract Documents.

E. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

3.3 Reference Standards.

A. Standards, Specifications, Codes, Laws, and Regulations.

1. Reference to federal specifications, federal standards, other standards, specifications, manuals, or codes of any technical society, organization, or association, or to Applicable Laws, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Applicable Laws in effect at the time of opening of Bids (or on the Effective Date of the Packet Page. 1717
Makerspace Room Remodel -24-
00 72 00 – GENERAL CONDITIONS
Contract if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.

2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of the City, Contractor, or any of their Subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to the City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.

3.4 Reporting and Resolving Discrepancies; Order of Precedence.

A. Reporting Discrepancies.

1. The Contract Documents are intended to be fully cooperative and complementary.

Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to the City any conflict, error, ambiguity, or discrepancy which Contractor discovers, should have discovered, or has actual knowledge of, and shall obtain a written interpretation or clarification from the City before proceeding with any Work affected thereby. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (i) any Applicable Law, (ii) any standard, specification, manual, or code, or (iii) any instruction of any Supplier, then Contractor shall promptly submit a written Request for Information (RFI) to the City.

Contractor shall not proceed with the Work affected thereby (except in an emergency) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in the Contract Documents, and any Work performed by Contractor before receipt of an amendment or supplement shall be at Contractor’s own risk.

B. Order of Precedence.

1. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:
a. Permits from other agencies as may be required by law b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
Packet Page. 1718
Makerspace Room Remodel -25-
00 72 00 – GENERAL CONDITIONS
g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications n. Standard Drawings
o. Reference Documents

2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings

3. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard, higher quality and most expensive shall always apply.

3.5 Amending and Supplementing Contract Documents.

A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof only by Change Order or written amendment to the Contract duly executed by the parties.

B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized at no cost to the City, by one or more of the following ways:

1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request without exception (subject to the provisions of the Contract Documents); or

2. The City’s issuance of a response to an RFI.

C. However, no review or RFI response will reduce or modify the Contractor’s obligation to fully satisfy and comply with the requirements of the Contract Documents.

Packet Page. 1719
Makerspace Room Remodel -26-
00 72 00 – GENERAL CONDITIONS

3.6 Reuse of Documents.

A. Contractor and any Subcontractor or Supplier shall not:

1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer of Record or its consultants, including electronic media editions; or

2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of the City and Engineer of Record and specific written verification or adaptation by Engineer of Record.

B. The prohibitions of this Article will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes.

ARTICLE 4 -INDEMNIFICATION; INSURANCE

4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the City’s choosing), indemnify and hold harmless the City, its officials, officers, agents, employees, and representatives, and each of them from and against:

1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caused, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the City or its officers, employees, or authorized volunteers (including passive negligence), except the sole negligence or willful misconduct or active negligence of the City or its officials, officers, employees, or authorized volunteers.

2. Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements.

3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor.

Packet Page. 1720
Makerspace Room Remodel -27-
00 72 00 – GENERAL CONDITIONS

4. Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under Contract. Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.

B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk, with the counsel of the City choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, its officials, officers, agents, employees and representatives. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against the City, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse the City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.

C. The provisions of this Article shall survive the termination of this Contract howsoever caused, and no payment, partial payment, or acceptance of occupancy in whole or part of the Work shall waive or release any of the provisions of this Article.

4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain all of the insurance described in this Article. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required hereunder. Contractor shall not allow any Subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this Article. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall furnish the City with original certificates of insurance and endorsements effective coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must be received and approved by the City before Work commences.

A. Additional Insureds; Waiver of Subrogation. The City, its officials, officers, employees, agents and authorized volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies of Commercial General Liability and Automobile Liability insurance using, for Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20 10 and 20 37 (or endorsements providing the exact same coverage, including completed operations), and, for subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same coverage). Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, all available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as Additional Insureds hereunder. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against the City, its Packet Page. 1721
Makerspace Room Remodel -28-
00 72 00 – GENERAL CONDITIONS
officers, officials, agents, employees or volunteers or shall specifically allow Contractor - or others providing insurance evidence in compliance with these specifications - to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. Copies of these waivers shall be submitted to the City prior to commencement of work.

B. Workers’ Compensation Insurance. The Contractor shall provide workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of Section 3700 of the Labor Code.

The Contractor shall file with the City certificates of his insurance protecting workers.

Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability Insurance, including Occupational Disease, in the amount of at least one million dollars ($1,000,000.00) per person per accident. Contractor shall provide the City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

D. Commercial General Liability Insurance. Contractor shall provide “occurrence” form Commercial General Liability insurance coverage at least as broad as the most current ISO CGL Form 00 01, including but not limited to, premises liability, contractual liability, products/completed operations, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Site, or the performance of its obligations hereunder. The policy shall not contain any exclusion contrary to this Contract including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured against another. Policy limits shall not be less than $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Defense costs shall be paid in addition to the limits.

1. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess Packet Page. 1722
Makerspace Room Remodel -29-
00 72 00 – GENERAL CONDITIONS
of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law.

2. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.

3. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions relating to liability for injury to or death of persons and damage to property.

4. If the coverage contains one or more aggregate limits, a minimum of fifty percent (50%) of any such aggregate limit must remain available at all times; if over fifty percent (50%) of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

5. All policies of general liability insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

E. Automobile Liability Insurance. Contractor shall provide Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least, one million dollars ($1,000,000) per accident for bodily injury and property damage.

Such insurance shall provide coverage with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible, in a form and with insurance companies acceptable to the City. All policies of automobile insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

F. Privacy/Network Security (Cyber). Contractor shall provide Cyber Liability Insurance, in a form and with insurance companies acceptable to City, in the amount of, at least, one million dollars ($1,000,000) per occurrence and aggregate. Such insurance shall provide coverage for: (1) privacy breaches, (2) system breaches, (3) denial or loss of service, and (4) the introduction, implantation or spread of malicious software code.

G. Aviation and/or Drone Liability. If Contractor shall utilize drones as part of the Work, Contractor shall provide Aviation and/or Drone Liability Insurance, in a form and with insurance companies acceptable to City, in the amount of, at least, one million dollars Packet Page. 1723
Makerspace Room Remodel -30-
00 72 00 – GENERAL CONDITIONS
($1,000,000) per occurrence limit. Such insurance shall provide coverage for bodily injury and property damage.

H. Builder’s Risk [“All Risk”]

1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [“All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures that are or will become part of the Work and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility for the Work until the Work is formally accepted by the City. The Contractor shall provide a certificate evidencing this coverage before commencing performance of the Work.

2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding those solely responsible for design work), suppliers, and the City, its elected officials, officers, employees, agents and authorized volunteers, as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Work following acceptance by the City.

3. Policy shall be provided for replacement value on an “all risk” basis. There shall be no coinsurance penalty provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) transit coverage, including ocean marine coverage (unless insured by the supplier), with sub-limits sufficient to insure the full replacement value of any key equipment item; and (5) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site. Such insurance shall be on a form acceptable to the City to ensure adequacy and sublimit.

4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit. c. Coverage shall include Contractor’s tools and equipment. d. Insurance shall include boiler, machinery and material hoist coverage.

I. Contractor shall require all tiers of Subcontractors working under this Contract to provide the insurance required under this Article unless otherwise agreed to in writing by the City. Contractor shall make certain that any and all Subcontractors hired by Contractor are insured in accordance with this Contract. If any Subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.

Packet Page. 1724
Makerspace Room Remodel -31-
00 72 00 – GENERAL CONDITIONS
J. Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, if Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

K. Form and Proof of Carriage of Insurance

1. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VIII. Insurance deductibles or selfinsured retentions must be declared by the Contractor. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self-insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. If umbrella or excess liability coverage is used to meet any required limit(s) specified herein, the Contractor shall provide a “follow form” endorsement satisfactory to the City indicating that such coverage is subject to the same terms and conditions as the underlying liability policy.

2. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or cancelled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, officers, agents, employees, and volunteers.

3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier(s) that it shall provide no less than thirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate the Contract or stop the Work in accordance with the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverage’s set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Site, or commence operations under this Contract until the City has been furnished original Certificate(s) of Insurance and certified original copies of endorsements or policies of insurance including all endorsements and any and all other attachments as required in this Article. The original endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.

4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and shall be construed as primary, and the City’s insurance and/or deductibles and/or self-insured retentions or self-insured programs shall not be construed as contributory.

Packet Page. 1725
Makerspace Room Remodel -32-
00 72 00 – GENERAL CONDITIONS

5. The City reserves the right to adjust the monetary limits and types of insurance coverages during the term of this Contract including any extension thereof if, in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.

6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and all insurance claims submitted by the Contractor in connection with the Work under this Contract.

7. Products/completed operations coverage shall extend a minimum of three years after the project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officers, officials, agents employees, and volunteers shall be included as insureds under the policy.

ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS

5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws applicable to the performance of the Work. Except where otherwise expressly required by Applicable Laws, neither the City nor the City’s Representative shall be responsible for monitoring Contractor’s compliance with any Applicable Laws. If Contractor performs any Work knowing or having reason to know that it is contrary to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work.

5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and paid for by Contractor, including, but not limited to, excavation permit, for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than the City, unless otherwise specified in the Contract Documents.

B. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off-site inspections delineated as the City’s responsibility pursuant to the Contract Documents.

C. Before acceptance of the Work, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.

Packet Page. 1726
Makerspace Room Remodel -33-
00 72 00 – GENERAL CONDITIONS

5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid in accordance with the Applicable Laws of the place of the Project which are applicable during the performance of the Work. In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.

5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic control shall be performed at Contractor’s expense in accordance with the requirements of the City and/or the local agency with jurisdiction. Costs for traffic control plans, implementation of traffic control, or traffic signal services required by the City shall be included in the Contractor’s Bid.

B. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the Project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the Project for approval prior to starting Work.

C. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction.

Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right-of-ways after working hours unless otherwise approved by the Engineer.

5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety laws. Contractor shall comply with all Applicable Laws relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property.

Packet Page. 1727
Makerspace Room Remodel -34-
00 72 00 – GENERAL CONDITIONS
B. The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the availability of emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section 1512. The Contractor shall submit an Illness and Injury Prevention Program and a Project Site specific safety program to the City prior to beginning Work. Contractor shall maintain a confined space program that meets or exceeds the City’s standards. Contractor needs to make themselves aware of the City’s safety policies and procedures, and shall meet or exceed all City standards in areas where the City must enter to perform inspections.

C. Hazard Communication Programs. Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Applicable Laws.

5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste onto the site in a manner not specified by the Contract Documents; and/or (ii) disturbs a Hazardous Material identified in the Contract Documents, the Contractor shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the condition as soon as possible. Under no circumstance shall the Contractor perform Work for which it is not qualified. The City, in its sole discretion, may require the Contractor to retain at Contractor’s cost an independent testing laboratory.

B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury or damage, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such material or substance (except in an emergency situation); and (iii) notify the City (and promptly thereafter confirm such notice in writing).

C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the presence or absence of the Hazardous Waste reported by the Contractor, except as qualified under Article 5.6(A) and Article 5.6(B) in the event such material or substance is found to be present, verify that the levels of the hazardous material are below OSHA Permissible Exposure Levels and below levels which would classify the material as a state of California or federal hazardous waste. When the material falls below such levels, Work in the affected area shall resume upon direction by the City.

D. Contractor shall indemnify and hold harmless the City from and against claims, damages, losses and expenses, arising from a Hazardous Waste on the Project Site, if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels which would classify the material as a state of California or federal hazardous waste, and was either i) shown on the Contract Documents or information available to bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall obligate the Contractor to indemnify the City in the event of the sole or active negligence or willful misconduct of the City, its officers, agents, or employees.

Packet Page. 1728
Makerspace Room Remodel -35-
00 72 00 – GENERAL CONDITIONS

5.7 Sanitary Facilities.

A. Contractor shall provide sanitary temporary toilet buildings and hand washing facilities for the use of all workers. All toilets and hand washing facilities shall comply with local codes and ordinances. Toilets shall be placed inside sealed secondary containment devices installed on a flat, level surface. Accumulated liquids in the secondary containment devices shall be properly removed and legally disposed without spillage onto the ground. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets and hand washing facilities shall be serviced no less than once weekly and shall be present in a quantity of not less than one (1) per twenty (20) workers as required by Cal/OSHA regulations. The toilets and hand washing facilities shall be maintained in a sanitary condition at all times.

Use of toilet and hand washing facilities in the Work under construction shall not be permitted. Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the Contractor.

5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads, permanent access roads, plant sites, waste disposal areas, borrow areas, and all other work areas free from dust. Industry accepted methods of dust control suitable for the area involved, such as sprinkling, chemical treatment, light bituminous treatment or similar methods, will be permitted.

5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.

B. Without limiting the foregoing, Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the Air Quality Management District with jurisdiction over the Project and/or California Air Resources Board (CARB). Contractor shall specifically be aware of the application of these limits and requirements to "portable equipment", which definition includes any item of equipment with a fuel-powered engine. Contractor shall indemnify the City against any fines or penalties imposed by the air quality management district, CARB, or any other governmental or regulatory agency for its violations of Applicable Laws as well as those of its subcontractors or others for whom Contractor is responsible under its indemnity obligations provided for in the Contract Documents.

5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various times during construction of the Work. The Contractor hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

Packet Page. 1729
Makerspace Room Remodel -36-
00 72 00 – GENERAL CONDITIONS
B. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions regulating discharges of storm water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000- 14950); and any and all regulations, policies, or permits issued pursuant to any such authority. These include, but are not limited to California State Water Resources Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002), as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any subsequent amendment to or renewal thereof, State Water Resources Control Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036), and any amendment or renewal thereof.

C. Contractor shall comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Construction General Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale.

Contractor shall comply with the lawful requirements of the City, and any other applicable municipality, drainage district, or other local agency with jurisdiction over the location where the Work is to be conducted, regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

D. Unless otherwise specified in the Special Conditions or other portion of the Contract Documents, the City has not prepared a Storm Water Pollution Prevention Plan (“SWPPP”) or other storm water compliance plan for the Project Site. Contractor shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage under the Construction General Permit. This includes filing all necessary documentation including the Permit Registration Documents (“PRDs”) through the Stormwater Multiple Applications and Report Tracking System (“SMARTS”); preparing and implementing a SWPPP for the Work site; implementing all other provisions, and monitoring and reporting requirements required by the Construction General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but not limited to preparation and submittal of all reports, plans, inspections, and monitoring information in compliance with the Construction General Permit. All submittals shall be coordinated with the City’s Legally Responsible Person and Authorized Signatory as those terms are defined in the Construction General Permit.

Before any NOI, PRD, SWPPP, or other Construction General Permit-related document may be submitted to the State Water Board or implemented on the Project site, it must first be reviewed and approved by the City and/or City’s designee.

Contractor shall include all costs of compliance with specified requirements in the Contract Price.

E. The City retains the right to develop its own documentation for the Project site, including but not limited to the SWPPP, and in the alternative may require Contractor to adopt and implement portions of the City developed SWPPP. The City expressly Packet Page. 1730
Makerspace Room Remodel -37-
00 72 00 – GENERAL CONDITIONS
reserves the right to procure coverage under the Construction General Permit for the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise fails to proceed in a manner that complies with the requirements of the Construction General Permit. The City additionally reserves the right to hire additional contractors to maintain compliance at the Work site. Whether Contractor has adequately maintained compliance with the Construction General Permit shall be the City’s sole determination. Any costs incurred by the City in procuring coverage under the Construction General Permit, or drafting and/or implementing a SWPPP for the Work site shall be paid by Contractor.

F. Notwithstanding the above, for those Work sites where construction activity results in the disturbance of less than one acre of total land area and/or do not need coverage under the Construction General Permit, the Contractor shall be responsible for preparing and implementing an Erosion and Sediment Control Plan in accordance with State Water Resources Control Board Order No. 2013-0001- DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.

G. Failure to comply with the Construction General Permit, laws, regulations, and ordinances listed in this Article is a violation of federal and state law.

Notwithstanding any other indemnity contained in these Contract Documents, Contractor agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, fees, costs, expenses, or losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances listed above, arising out of or in connection with the Work, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.

H. The City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy. Contractor hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and any relevant enforcement entity.

5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and local environmental rules and regulations. Any infractions of said rules and regulations by the Contractor during the term of the Contract, which result in penalties, will be the responsibility of the Contractor. The City operates under a number of environmental permits issued by various agencies. If due to an action, inaction, or negligence by the Contractor, the City becomes subject to noncompliance penalties, the cost of such penalties shall be borne by the Contractor.

B. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.

Movement of crews and equipment within the rights-of-way and over routes provided for access to the Work shall be performed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original Packet Page. 1731
Makerspace Room Remodel -38-
00 72 00 – GENERAL CONDITIONS
contours. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.

C. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within two (2) days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the endangered plant or animal. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.

D. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor shall notify the construction/archeological monitor and/or the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the construction/archeological monitor and/or City within two (2) days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the cultural resource. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the City Representative and the construction/archeological monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor shall be principally responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents.

5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that Packet Page. 1732
Makerspace Room Remodel -39-
00 72 00 – GENERAL CONDITIONS
equipment as established by Cal/OSHA. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements.

B. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. Contractor shall complete and execute any certification forms required by the City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

5.14 Inspector’s Field Office.

A. If required by the City, the Contractor shall be responsible for providing the inspector’s field office. The office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, an ability to connect to the internet, and a fax machine at Contractor’s expense. The field office shall be provided within twenty (20) days of the Notice to Proceed.

B. A table satisfactory for the study of plans and two chairs shall be provided by Contractor. Contractor shall provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

5.15 Contractor’s Supervision.

A. Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project.

Packet Page. 1733
Makerspace Room Remodel -40-
00 72 00 – GENERAL CONDITIONS

5.16 Workers.

A. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.

B. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project.

5.17 Independent Contractors.

A. Contractor shall be an independent contractor for the City and not an employee.

Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of the City and are not entitled to benefits of any kind normally provided employees of the City, including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.

5.18 Verification of Employment Eligibility.

A. By executing the Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub-subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of the Contractor or its Subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.

5.19 Labor.

A. Hours of Work

1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided.

Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and onehalf times the basic rate of pay.

Packet Page. 1734
Makerspace Room Remodel -41-
00 72 00 – GENERAL CONDITIONS

2. The Contractor and every Subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.

3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.

4. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to the City.

5. If Contractor gives notice of an inspection pursuant to the Contract Documents, the City will provide inspection during normal working hours from 7:00 a.m. to 3:30 p.m. Monday through Friday. Requested inspections before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two (2) Days’ notice for review and approval. Upon written request and approval the eight and a half (8.5) hour working day may be changed to other limits subject to city/county ordinance.

6. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project Site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance

1. Pursuant to Labor Code Section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require Subcontractor(s) to certify weekly payroll records under penalty of perjury.

Packet Page. 1735
Makerspace Room Remodel -42-
00 72 00 – GENERAL CONDITIONS

2. In accordance with Labor Code Section 1771.4, the Contractor and each Subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3. Any stop orders issued by the DIR against Contractor or any Subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Contractor or any Subcontractor.

4. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
a. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
b. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.

5. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.

6. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or performing the Contract shall not be marked or obliterated.

7. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such ten (10) day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payment then due.

Packet Page. 1736
Makerspace Room Remodel -43-
00 72 00 – GENERAL CONDITIONS

8. The responsibility for compliance with this Article shall rest upon the Contractor.

C. Prevailing Rates of Wages

1. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the City’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.

2. The Contractor shall forfeit as a penalty to the City not more than two hundred dollars ($200.00), pursuant to Labor Code Section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under the Contract by it or by any Subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.

3. Contractor shall post, at appropriate conspicuous points on the Project Site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.

D. Public Works Contractor Registration

1. Pursuant to Labor Code Sections 1725.5 and 1771.1, the Contractor and its Subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR.

Contractor shall maintain a current registration for the duration of the Project.

Contractor shall further include the requirements of Labor Code Sections 1725.5 and 1771.1 in any subcontract and ensure that all Subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not Packet Page. 1737
Makerspace Room Remodel -44-
00 72 00 – GENERAL CONDITIONS
apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

E. Employment of Apprentices

1. Contractor and all Subcontractors shall comply with the requirements of Labor Code Sections 1777.5 and 1777.6 in the employment of apprentices.

2. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

3. Knowing violations of Labor Code Section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non-compliance pursuant to Labor Code Section 1777.7.

F. Nondiscrimination/Equal Employment Opportunity

1. Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.

G. Debarment of Contractors and Subcontractors

1. Contractors or Subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

5.20 Subcontracts.

A. Contractor agrees to bind every Subcontractor to the terms of the Contract Documents as far as such terms are applicable to Subcontractor’s portion of the Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed Packet Page. 1738
Makerspace Room Remodel -45-
00 72 00 – GENERAL CONDITIONS
by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.

B. The City reserves the right to accept all subcontractors. The City’s acceptance of any Subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.

C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code Section 4100 et seq.

5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly and at other times as requested by Engineer or as required by progress of the Work.

The Contractor, City, and all Subcontractors active on the Site shall attend each meeting. Contractor may at its discretion request attendance by representatives of its Suppliers, manufacturers, and other Subcontractors. The City will preside at the progress meetings and will arrange for keeping and distributing the minutes. The purpose of the meetings is to review the progress of the Work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop. During each meeting, the Contractor shall present any issues which may impact its progress with a view to resolve these issues expeditiously.

5.22 Submittals
A. Schedule of Submittals. Within five (5) days after the Notice to Proceed (unless otherwise specified in the Contract Documents), Contractor will prepare and deliver a Schedule of Submittals to the City that has been fully integrated with the progress schedule and identifies each Submittal required by the Contract Documents as well as the date on which Contractor will deliver each Submittal to the City. Each Submittal must be delivered to the City at least thirty (30) days prior to the date the material or equipment is scheduled to be incorporated into the Work. The Contractor is responsible for any schedule delays resulting from the Submittal process.

B. Submittal Procedures.

1. Contractor will follow the following procedures for each Submittal, Shop Drawing and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised Submittals with original number and sequential alphabetic suffix. c. Each Submittal will identify the Project, Contractor, Subcontractor and Supplier, pertinent Drawing and detail number, and Specification Section number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved each Submittal, verified products required, field dimensions, adjacent Packet Page. 1739
Makerspace Room Remodel -46-
00 72 00 – GENERAL CONDITIONS
construction Work, and that coordination of information is according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations that may differ and/or be detrimental to successful performance of completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address the City’s comments and resubmit. Contractor shall identify changes made since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called the City’s attention to such deviations at time of submission and the City has taken no exception to the deviation. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from incomplete Submittals are not the responsibility of the City. j. Contractor shall not be entitled to any extension of the Contract Times as a result of the Submittal process.
k. Contractor shall allow a minimum of twenty (20) working days for review of Submittals unless otherwise specified in the Contract Documents.

2. Where a Submittal, Shop Drawing or Sample is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to the City review and approval of the pertinent submittal will be performed at the sole risk and expense and responsibility of Contractor.

C. Schedule Milestone for Submittals. Contractor must submit all Submittals required by the Contract Documents in accordance with the Schedule of Submittals. If Contractor fails to submit the Submittals in accordance with the Schedule of Submittals, Contractor will be solely liable for any delays or impacts caused by the delayed Submittal, whether direct or indirect. Contractor will be liable for the time calculated from the date the Submittal is due until the date a compliant Submittal is made. A compliant Submittal will be one that is complete and satisfies the requirements of the Contract Documents.

5.23 Shop Drawings and Sample Submittal Procedures.

A. Before submitting each Shop Drawing or Sample, Contractor shall have:

1. Reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents;
Packet Page. 1740
Makerspace Room Remodel -47-
00 72 00 – GENERAL CONDITIONS

2. Determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;

3. Determined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and

4. Determined and verified all information relative to Contractor’s responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.

B. With each Submittal, Contractor shall give the City specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawings or Sample Submittal and, in addition, a specific notation made on each Shop Drawing or Sample submitted to the City for review and approval of each such variation.

C. Shop Drawings.

1. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show the City the services, materials, and equipment Contractor proposes to provide and to enable the City to review the information for assessing conformance with information given and design concept expressed in Contract Documents.

2. When required by individual Specification sections, provide Shop Drawings signed and sealed by a professional engineer responsible for designing components shown on Shop Drawings. Shop Drawings must include signed and sealed calculations to support design in a form suitable for submission to and approval by authorities having jurisdiction.

3. Shop Drawings for steel structures shall consist of shop details, erection and other working Drawings showing details, dimensions, sizes of members and other information necessary for the complete fabrication and erection of the metal work.

4. Shop Drawings of concrete structures shall consist of such detailed drawings as may reasonably be required for the successful prosecution of the Work and which are not included in the Drawings furnished by the Engineer. These may include drawings for false work, bracing, centering and form work, masonry layout diagrams, and diagrams for bent reinforcement.

5. Contractor shall make revisions and provide additional information when required by authorities having jurisdiction.

D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as required to enable the City to review the submittal for assessing conformance with information given and design concept expressed in Contract Documents. Samples should be of appropriate size and detail to assess functional, aesthetic, color, texture, patterns and finish selection.

Packet Page. 1741
Makerspace Room Remodel -48-
00 72 00 – GENERAL CONDITIONS
E. City’s Review.

1. The City will review Shop Drawings and Samples in accordance with the Schedule of Submittals. The City’s review and acceptance will be only to determine if the items covered by the Submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents.

2. The City review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.

3. The City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless the City has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample.

F. Resubmittal Procedures. Contractor shall make corrections required by the City and shall return corrected Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by the City on previous Submittals.

5.24 Record (“As-Built”) Drawings.

A. The Contractor shall maintain one record set of Contract Documents at the Site or digitally in an acceptable format. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Drawings. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every one hundred (100) linear feet, and at each bend, recording both the horizontal and vertical locations. Said Drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. Any required as-built drawings of civil engineering elements of the Work shall be prepared by a registered civil engineer.

B. These master Record Drawings of the as-built conditions, including all revisions made necessary by Addenda and Change Orders, shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes.

Notes shall identify relevant Change Orders by number and date. Record Drawings shall be accessible to the Engineer at all times during the construction period.

Failure on the Contractor’s part to keep Record Drawings current could result in withholding partial payment.

Packet Page. 1742
Makerspace Room Remodel -49-
00 72 00 – GENERAL CONDITIONS
C. Upon completion of the Project and as a condition of final acceptance, the Contractor shall finalize and deliver a complete set of Record Drawings to the Engineers. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to the City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the Record Drawings.

D. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Record Drawings shall be included in Contractor’s bid and distributed in the Bid Schedule. No additional compensation shall be made to the Contractor for this Work.

5.25 Layout and Field Engineering.

A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Work performed.

5.26 Separate Contracts and Cooperation.

A. Separate Contracts. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the Work in place or discrepancies with the Contract Documents.

B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.

Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project Site.

5.27 Work Site.

A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-ofentry for the Work will be provided by the City. Unless otherwise specified in the Special Provisions, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the City harmless from all claims for damages caused by such actions. Contractor shall Packet Page. 1743
Makerspace Room Remodel -50-
00 72 00 – GENERAL CONDITIONS
confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Applicable Laws, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to City or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work.

B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to Applicable Laws. The Contractor shall furnish trash bins for all debris from construction. All debris shall be placed in trash bins daily. Forms and false-work that are to be re-used shall be stacked neatly concurrently with their removal. Forms and false-work that are not to be re-used shall be disposed of concurrently with their removal.

C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make it ready for utilization by the City. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.

5.28 Utility Usage.

A. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor.

Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on the Work where the utility is needed. Upon completion of the Work, Contractor shall remove all temporary distribution systems. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Work, including but not limited to startup and testing required in the Contract Documents. All permanent meters installed shall be listed in the Contractor’s name until the Work is accepted. For Work to be performed in existing City facilities, Contractor may use the City’s existing utilities, provided such use is reasonable under the circumstances. If Contractor uses the City utilities, it will not need to compensate the City for reasonably consumption of utilities, but Contractor will be responsible for any excessive, unreasonable or wasteful utility usage. Amounts due the City under this section may be deducted from progress payments.

5.29 Protection of Work and Property.

A. The Contractor shall digitally record video and take photographs of the Project site and adjacent improvements in a manner and quality that clearly depicts the existing condition of the Project Site and adjacent improvements immediately prior to the start of Work (minimum 1080p video and 4MP photo). All videos and photographs shall be date and time stamped. The Contractor shall submit the video and photos in digital format on a memory stick before the commencement of Work, along with a map outlining the route and locations of the videos and/or photographs. The Contractor shall be responsible for all damages to persons or property that occur as a result of the Work. Contractor shall be responsible for the proper care and Packet Page. 1744
Makerspace Room Remodel -51-
00 72 00 – GENERAL CONDITIONS
protection of all materials delivered and Work performed until completion and final acceptance by the City. All Work shall be solely at the Contractor’s risk.

B. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.

C. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.

D. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:

1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.

2. Provide substantial barricades around any shrubs or trees indicated to be preserved.

3. Deliver materials to the Site over a route designated by the City.

4. Provide any and all dust control required and follow the applicable air quality regulations as appropriate. If the Contractor does not comply immediately with a notice from the City or a public agency responsible for air quality, the City shall have the authority to provide dust control and deduct the cost from payments to the Contractor.

5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the City.

Contractor shall not unreasonably encumber the Site with its materials.

6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the City, at no cost to the City.

7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.

8. Preserve and protect from injury all buildings, pole lines and all directional, warning and mileage signs that have been placed within the right-of-way.

Packet Page. 1745
Makerspace Room Remodel -52-
00 72 00 – GENERAL CONDITIONS

9. At the completion of work each day, leave the Work and the Site in a clean, safe condition.

10. Comply with any stage construction and/or traffic handling plans. Access to residences and businesses shall be maintained at all times, except with the City’s written approval. Any request for approval to reduce or restrict access to residences and business must be submitted to the City at least seven (7) days in advance, and the City may issue or withhold approval in its sole discretion.

E. These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the work involved in the protection and preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.

F. Should damage to persons or property occur as a result of the Work, Contractor shall promptly notify the City, in writing. Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

G. Contractor shall maintain all investigation documentation including video and/or photographs for a minimum of four (4) years following completion of the Project.

5.30 Emergencies.

A. In emergencies affecting the safety or protection of persons or the Work or Property at the Site or adjacent thereto, the Contractor, without special instruction or authorization from the City or the Engineer, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the Engineer prompt written notice if the Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby.

ARTICLE 6 -MATERIALS; INSPECTION

6.1 Access to Work.

A. The City, Engineer, their consultants and other representatives and personnel, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs.

6.2 Materials.

A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities whatsoever necessary to execute and complete this Contract within the Contract Time. Unless otherwise specified, all materials, parts, Packet Page. 1746
Makerspace Room Remodel -53-
00 72 00 – GENERAL CONDITIONS
and equipment furnished by the Contractor in the Work shall be new, the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.

B. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.

C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work. Materials shall be stored on the Project Site in such manner so as not to interfere with any operations of the City or any independent contractor.

D. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item overruns and underruns in accordance with the Contract Documents, no additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Schedule, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Engineer for consideration before proceeding with the Work.

6.3 Test and Inspections.

A. Inspection and Testing of Work and Materials

1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or approved, Contractor shall provide the Engineer at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection.

Required certificates of inspection (or similar) shall be secured by Contractor.

Costs for City testing and inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.

2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials testing technician that was called for by the Contractor but ultimately the Contractor work was not ready for the inspection. Any such costs shall be deducted from any amounts due to the Contractor.

3. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.

Packet Page. 1747
Makerspace Room Remodel -54-
00 72 00 – GENERAL CONDITIONS

4. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor.

Unless otherwise stated and as provided by the Contract Documents, the City shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.

5. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

B. Testing of Materials

1. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work.

2. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.

3. Unless otherwise specified in the Special Provisions, all initial testing and a reasonable amount of retesting will be performed under the direction of the Engineer, and at no expense to the Contractor. The Contractor shall notify the Engineer in writing, at least fifteen (15) days in advance, of its intention to use materials for which tests are specified, to allow sufficient time to perform the tests.

The notice shall name the proposed supplier and source of material. If the notice of intent to use is sent before the materials are available for testing or inspection, or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor's responsibility to re-notify the Engineer when samples which are representative may be obtained.

4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of any material or assembled material for which these Specifications so require or if so required by the Engineer. The Engineer may waive the materials testing requirements and accept a Certificate of Compliance. Material test data may be required by the Engineer to be included with the submittal. Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The submission of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material into the Work which conforms to the requirements of the Contract Documents, and any material not conforming to the requirements will be subject to rejection by the Engineer whether in place or not.

Packet Page. 1748
Makerspace Room Remodel -55-
00 72 00 – GENERAL CONDITIONS

5. Copies of mill certificates of composition and quality of all component materials (reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of the Work shall be provided to the City at the time of delivery. City shall retain the right to reject any raw material not provided with a mill certificate at the time of delivery.

6. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the Work, and shall be removed from the Project Site all at the Contractor’s expense.

6.4 Requests for Substitutions.

A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referenced herein.

B. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.

C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in the Contract Documents. However, the City has adopted uniform standards for certain materials, processes, and articles.

D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than thirty-five (35) calendar days after award of Contract. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract. If a substitution request is rejected by the City, the Contractor shall provide the material, method or service specified herein. The City shall not be responsible for any costs incurred by the Contractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Engineer has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.

E. Substantiating data as described above shall include, at a minimum, the following information:

Packet Page. 1749
Makerspace Room Remodel -56-
00 72 00 – GENERAL CONDITIONS

1. A signed affidavit from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the affidavit.

2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.

3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the contract.

4. Information detailing the durability and lifecycle costs of the proposed substitution.

F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Engineer is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.

G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.

H. The Contractor shall bear the costs of all the City work associated with the review of substitution requests.

I. If substitution requests approved by the Engineer require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.

ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES

7.1 Soils Investigations.

A. When a soils investigation report for the Site is available, such report is provided for informational purposes only. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the Site before submitting its Bid and must make whatever tests it deems appropriate to determine the condition of the soil.

7.2 Ownership of Site Materials Found.

A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials developed or obtained in the excavation or other operations of Contractor or any of its Subcontractors in the performance of the Contract, and the right to use said items in carrying out the Contract, or to dispose of same, is hereby expressly reserved by Packet Page. 1750
Makerspace Room Remodel -57-
00 72 00 – GENERAL CONDITIONS
the City. Neither Contractor nor any of its Subcontractors nor any of their representatives or employees shall have any right, title, or interest in said materials, nor shall they assert or make any claim thereto. Contractor will, as determined by the City’s Representative, be permitted to use in the Work without charge, any such materials which meet the requirements of the Contract Documents, provided the City shall have the right to use or consume these materials without payment to a third party.

7.3 Existence of Utilities at the Work Site.

A. Existing Utilities

1. The location of known existing utilities and pipelines are shown on the Plans in their approximate locations. However, nothing herein shall be deemed to require the City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the project can be inferred from the presence of other visible facilities, such as buildings, cleanouts, meter and junction boxes, on or adjacent to the Site of the Project.

2. The City will assume the responsibility for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the Project site if such utilities are not identified by the City in the Contract Documents or which cannot reasonably be inferred from the presence of other visible facilities.

B. Utility Location

1. It shall be the Contractor’s responsibility to determine the exact location and depth of all utilities, including service connections, which have been marked by the respective utility owners and which the Contractor believes may affect or be affected by the Contractor’s operations. The Contractor shall not be entitled to additional compensation nor time extensions for work necessary to avoid interferences nor for repair to damaged utilities if the Contractor does not expose all such existing utilities as required by this Article.

2. The locating of utilities shall be in conformance with Government Code Section 4216 et seq. except for the City’s utilities located on the City’s property and not on public right-of-way.

3. A “High Priority Subsurface Installation” is defined in Government Code Section 4216 (j) as “high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig) or greater than six inches nominal pipe diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.”

4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as “any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized drain lines.”
Packet Page. 1751
Makerspace Room Remodel -58-
00 72 00 – GENERAL CONDITIONS

5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the appropriate regional notification center at least two (2) working days but not more than fourteen (14) Days before performing any excavation. The date of the notification shall not count as part of the two-working-day notice. Before notifying the appropriate regional notification center, the Contractor shall delineate the area to be excavated. The Contractor shall request that the utility owners conduct a utility survey and mark or otherwise indicate the location of their service. The Contractor shall furnish to the Engineer written documentation of its contact(s) with the regional notification center prior to commencing excavation at such locations.

6. After the utility survey is completed, the Contractor shall commence “potholing” or hand digging to determine the actual location of the pipe, duct, or conduit and in accordance with Government Code Section 4216.4 if the excavation within the “tolerance zone” of a subsurface installation. The Engineer shall be given notice prior to commencing potholing operations. The Contractor shall uncover all piping and conduits, to a point one (1) foot below the pipe, where crossings, interferences, or connections are shown on the Drawings, prior to trenching or excavating for any pipe or structures, to determine actual elevations. New pipelines shall be laid to such grade as to clear all existing facilities, which are to remain in service for any period subsequent to the construction of the run of pipe involved.

7. The Contractor's attention is directed to the requirements of Government Code Section 4216.2 (c) which provides: “When the excavation is proposed within ten (10) feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.” The Contractor shall notify the Engineer in advance of this meeting.

C. Utility Relocation and Repair

1. If interferences occur at locations other than those indicated in the Contract Documents with reasonable accuracy, the Contractor shall notify the Engineer in writing. The Engineer will supply a method for correcting said interferences in accordance with the responsibilities of this section and Government Code Section 4215. To the extent any delay is caused thereby, Contractor shall submit a notice of delay within five (5) Days of discovery of the circumstances giving rise to the delay in accordance with Article 9.1 Change Orders and Time Extensions.

2. Care shall be exercised by the Contractor to prevent damage to adjacent existing facilities and public or private works; where equipment will pass over these obstructions, suitable planking shall be placed. If high priority subsurface installations are damaged and the operator cannot be contacted, the Contractor shall call 911 emergency services.

Packet Page. 1752
Makerspace Room Remodel -59-
00 72 00 – GENERAL CONDITIONS

3. The City will compensate the Contractor for the costs of locating and repairing damage not due to the failure of the Contractor to exercise reasonable care, and for removing or relocating such main or trunk line utility facilities not indicated in the Contract Documents with reasonable accuracy, and for the cost of equipment on the Project necessarily idled during such work. The payment for such costs will be made as provided in Article 9.1 Change Orders and Time Extensions. The Contractor shall not be assessed liquidated damages for delay in completion of the Project, when such delay is caused by the failure of the City or utility company to provide for removal or relocation of such utility facilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for Completion and Liquidated Damages.

4. The public utility, where it is the owner of the affected utility, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. The right is reserved to the City and the owners of utilities or their authorized agents to enter upon the Work area for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties.

The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such forces and shall allow the respective utilities time to relocate their facility.

5. When the Contract Documents indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utility company and the work will be done at no cost to the Contractor, unless otherwise stipulated in the Contract Documents.

6. Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor’s responsibility and it shall make arrangements and bear all costs for such work.

D. Construction at Existing Utilities

1. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.

2. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the City Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify City as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to Packet Page. 1753
Makerspace Room Remodel -60-
00 72 00 – GENERAL CONDITIONS
property resulting from the negligent, accidental, or intentional breaching of utilities.

3. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this work, shall be included in Contractor’s bid and distributed in the schedule of pay Items. No additional compensation shall be made to the Contractor for this work.

7.4 Trenches
A. Trenches Five Feet or More in Depth.

1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Engineer.

Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.

B. Excavations Deeper than Four Feet.

1. If the Work involves excavating trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly within three (3) Days, and before the excavation is further disturbed, notify the City in writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those indicated.
c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.

2. The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part Packet Page. 1754
Makerspace Room Remodel -61-
00 72 00 – GENERAL CONDITIONS
of the Work, shall issue a Change Order under the procedures described in Article

9.1 Change Orders and Time Extensions.

3. In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

ARTICLE 8 -PROSECUTION OF THE WORK

8.1 Contractor’s Means and Methods.

A. Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

8.2 Construction Schedule.

A. General Requirements. The schedule shall be prepared in a Critical Path Method (“CPM”) format and in an electronic scheduling program acceptable to the City and as specified in the Contract Documents. Contractor shall deliver the schedule and all updates to the City in both paper and electronic form. The electronic versions shall be in the format and include all data used to prepare the schedule. Copies are not acceptable.

B. Schedule. The receipt or approval of any schedules by the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project.

Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract Time. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the City.

C. Schedule Contents. The schedule shall allow enough time for inclement weather.

The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include appropriate time allowances and constraints for submittals, items of interface with Work performed by others, and specified construction, start-up and performance tests. All float shall be owned by the Project. Schedules indicating early or late completion shall not modify or have any effect on the Contract Time, regardless of whether the schedules are reviewed and/or accepted by the City. For purposes of determining Liquidated Damages, the Contract Time shall control and may only be altered by a duly authorized Change Order.

Packet Page. 1755
Makerspace Room Remodel -62-
00 72 00 – GENERAL CONDITIONS
D. Schedule Updates. Contractor shall continuously update its construction schedule.

Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule; (2) with each progress payment request; and (3) whenever requested to do so by the City. The City may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule. Upon the City’s request, Contractor shall submit any schedules or updates to the City in the native electronic format of the software used to create the schedule. Contractor shall also submit schedules showing a two (2)- week detailed look-ahead at weekly meetings conducted with the City. The two (2)- week look-ahead schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Work within the Contract Time, and it shall clearly state the number of staff to be used on each daily segment of the Work.

E. Acceptance. Acceptance of the schedules by the City will not impose on responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or compliance with the Contract Documents. Acceptance will not interfere with or relieve Contractor from Contractor’s full responsibility therefor.

F. Recovery Schedule.

1. Should any of the following conditions exist, City may require Contractor to prepare, at no extra cost to City, a plan of action and a recovery schedule for completing the Work and achieving all contractual milestones within the allotted Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the opinion of City, of sufficient magnitude that City questions the Contractor's ability to complete the Work;
b. The schedule shows the Contractor to be thirty (30) or more days behind the critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration of future activities of the schedule which, in the opinion of City, are major in nature.

2. The recovery schedule shall include proposed revisions to the Construction Schedule, demonstrating how Contractor intends to achieve all contractual milestones including Contract completion within the allotted Contract Time. The submittal shall include a narrative describing the actions planned by the Contractor to recover the schedule.

3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s request. If Contractor asserts that City is responsible for the delay, failure to submit the recovery schedule within seven (7) Days of City’s request, will be considered a concurrent delay event attributable to Contractor, and Contractor shall only be entitled to non-compensable adjustments to Contract Times. If Contractor is responsible for the delay, this provision will not limit or affect Contractor's liability and failure to submit the recovery schedule with seven (7) Days of City’s request Packet Page. 1756
Makerspace Room Remodel -63-
00 72 00 – GENERAL CONDITIONS
may result in City withholding progress payments or other amounts due under the Contract Documents.

4. Contractor is responsible for all costs associated with the preparation and execution of the recovery schedule, including any necessary recovery actions, which may include, but are not limited to, assignment of additional labor, and/or equipment, shift or overtime work, expediting of submittals or deliveries, overlapping of activities or sequencing changes to increase activity concurrence.

Regardless of whether City directs Contractor to prepare a recovery schedule pursuant to this Section, Contractor shall promptly undertake appropriate action at no additional cost to City to recover the schedule whenever the current construction schedule shows that the Contractor will not achieve a milestone and/or complete the Work within the allotted Contract Time.

8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract for Construction shall commence: (1) on the date stated in the Notice to Proceed, or (2) if the Notice to Proceed does not specify a commencement date, then on the date of the Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float. Contractor shall not be entitled to compensation, and the City will not compensate Contractor, for delays which impact early completion. Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date.

B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is understood that the City will suffer damage. In accordance with Government Code Section 53069.85 and Public Contract Code Section 7102, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.

C. Inclement Weather. Contractor shall abide by the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule. Contractor shall not be entitled to reverse liquidated damages for time extensions resulting from inclement weather.

D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is limited to a City-caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. Contractor Packet Page. 1757
Makerspace Room Remodel -64-
00 72 00 – GENERAL CONDITIONS
shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its Subcontractors or Suppliers). The City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Contractor shall not be entitled to an adjustment in the Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.

E. Force Majeure. In accordance with subparagraphs “D” and “E” above, the Contractor shall not be charged liquidated damages, and the City shall not be responsible, for any delays resulting from a Force Majeure Event. If a delay to the critical path results from a Force Majeure Event, the Contractor will be entitled to a time extension but will not receive an adjustment to the Contract Price or any other compensation. Such a non-compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays.

F. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

G. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled to any extension of time or any reverse liquidated damages unless Contractor properly notices the delay and adjustment to compensation and requests a Change Order in accordance with Article 9.1 Change Orders and Time Extensions.

Contractor’s failure to timely and fully comply with the Change Order procedures in the Contract Documents shall constitute a waiver of Contractor’s right to a time extension or reverse liquidated damages.

8.4 Contractor’s Responsibility for Work.

A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be under the charge and care of the Contractor. The Contractor shall take every necessary precaution against injury or damage to any part thereof by the action of the elements or from any cause whether arising from the execution or non-execution of the Work. The Contractor shall rebuild, repair, restore and make good at its own expense all injuries or damages to any portion of the Work before its completion and acceptance. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City will pay for repair or restoration to damaged Work in excess of 5% of the total Bid.

8.5 Occupancy.

A. The City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

Packet Page. 1758
Makerspace Room Remodel -65-
00 72 00 – GENERAL CONDITIONS

8.6 Securities for Money Withheld
A. Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor may request the City to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the City to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in Section 22300 of the Public Contract Code.

8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City

1. The City may, at its sole option, decide to suspend at any time the performance of all or any portion of the Work by notice in writing to Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension.

Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.

2. Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise:
a. Immediately discontinue Work on the date and to the extent specified in the notice;
b. Place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent required in the notice;
c. Promptly make every reasonable effort to obtain suspension upon terms satisfactory to the City’s Representative of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and
d. Continue to protect and maintain the Work including those portions on which Work has been suspended.

3. Except as provided by this Article, as full and complete compensation for such suspension, Contractor shall be granted an adjustment in the Contract Price based on a negotiated daily rate that reflects the Contractor’s actual costs associated with the demobilized condition of the Site and an extension of the Contract Times equal to the number of days performance of Work is suspended; provided, however, that no adjustment of Contract Price or extension of Contract Times shall be granted if the suspension results from Contractor's non-compliance with the requirements of the Contract.

B. Termination for Cause by the City:

Packet Page. 1759
Makerspace Room Remodel -66-
00 72 00 – GENERAL CONDITIONS

1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the City may serve written notice upon the Contractor and its surety of the City's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the Contractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) days unless such violations have ceased and arrangements satisfactory to the City have been made for correction of said violations.

2. After expiration of the ten (10) day period, the City may terminate the Contract by providing a Notice of Termination to the Contractor. The City may take over and complete the Work by any method it may deem appropriate, including enforcement of the Project performance bond. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Work. If the City takes over the Work, the City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Site.

3. Upon termination, Contractor shall not be entitled to receive any further payment from the City, except for Work which was duly performed prior to the effective date of the Notice of Termination. Contractor shall submit an invoice for final payment within thirty (30) days of the effective date of the Notice of Termination. The City may withhold from final payment up to one hundred fifty percent (150%) of any disputed amounts, including any amounts which may be necessary to repair defective Work, complete unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its duties under the Contract.

C. Termination for Convenience by the City:

1. The City may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, upon ten (10) days written notice if the City determines that a termination is in the City's interest.

2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of the City, the extent of termination, and the effective date of such termination.

3. After receipt of Notice of Termination, and except as directed by the City's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this termination for convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.

Packet Page. 1760
Makerspace Room Remodel -67-
00 72 00 – GENERAL CONDITIONS
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) days from the effective date of the Notice of Termination, all of the usual documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the effective date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 days after the effective date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.” If the City rejects any costs, Contractor shall be deemed to waive the rejected costs unless Contractor files a Claim within thirty (30) days of the rejection pursuant to Article 9.2.
g. Contractor shall be entitled to receive only the amounts payable under this Article, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits. The provisions in this Article are in addition to and not in limitation of any other rights or remedies available to the City.

4. Termination of the Contract shall not relieve surety of its obligation for any just claims arising out of or relating to the Work performed.

5. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

6. If the City terminates Contractor for cause, and if it is later determined that the termination was wrongful, such default termination shall automatically be converted to and treated as a termination for convenience. In such event, Contractor shall be entitled to receive only the amounts payable under this section, Packet Page. 1761
Makerspace Room Remodel -68-
00 72 00 – GENERAL CONDITIONS
and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits.

8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is complete, the Engineer will promptly make a final inspection with the City and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.

B. Final Acceptance. The acceptance of the Work on behalf of the City will be made by the Engineer. Such acceptance by the City shall not constitute a waiver of defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, Record Documents, and other documents required by the Contract Documents, the City shall execute a Notice of Completion, constituting final acceptance and completion of the Project, except as may be expressly noted.

8.9 Warranty and Guaranty of Work.

A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the City, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year (or as otherwise indicated in the Contract Documents or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) from the date of the Notice of Completion of the Project without any expense whatever to the City, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.

B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the above-mentioned conditions within ten (10) days after being notified in writing of required repairs, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming Work and any work Packet Page. 1762
Makerspace Room Remodel -69-
00 72 00 – GENERAL CONDITIONS
damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder immediately upon demand.

C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City all warranties that would be given in normal commercial practice and assign to the City any and all manufacturer’s or installer’s warranties for equipment or materials not manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the City with all warranty and guarantee documents prior to final acceptance of the Project by the City as required.

D. When specifically indicated in the Contract Documents or when directed by the Engineer, the City may furnish materials or products to the Contractor for installation.

In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the City for installation by the Contractor to be voided or reduced, Contractor shall indemnify the City from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the City for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.

E. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.

F. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) days after being notified commence and perform with due diligence all necessary Work.

If the Contractor fails to promptly remedy any defect or damage, the City shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.

G. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition.

H. Acceptance of Defective Work.

1. If, instead of requiring correction or removal and replacement of defective Work, the City prefers to accept it, the City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to the City’s evaluation of and determination to accept such defective Work and for the diminished value of the Work. If any acceptance of Defective Work occurs prior to release of the Project retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and the City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by the City. If the acceptance of defective occurs after release of the Project retention, an appropriate amount will be paid by Contractor to the City.

Packet Page. 1763
Makerspace Room Remodel -70-
00 72 00 – GENERAL CONDITIONS
I. The City May Correct Defective Work

1. If Contractor fails within a reasonable time after written notice from the City to correct Defective Work, or to remove and replace rejected Work as required by the City, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, the City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency.

2. In connection with such corrective or remedial action, the City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which the City has paid Contractor but which are stored elsewhere. Contractor shall allow the City, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable the City to exercise the rights and remedies to correct the Defective Work.

3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by the City correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the City shall be entitled to an appropriate decrease in the Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of defective Work.

4. If the Change Order is executed after all payments under the Contract have been paid by the City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to the City. If the Change Order is executed after release of the Project retention, an appropriate amount will be paid by Contractor to the City. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the City correcting Defective Work.

J. Nothing in the warranty or in the Contract Documents shall be construed to limit the rights and remedies available to the City at law or in equity, including, but not limited to, Code of Civil Procedure Section 337.15.

ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION

9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be through a written Change Order in accordance with this Article. The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever Packet Page. 1764
Makerspace Room Remodel -71-
00 72 00 – GENERAL CONDITIONS
any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed with performance of the Work, including Additional Work, promptly and expeditiously.

Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.

A. Change in Contract Procedures

1. City Directive. The City may direct changes in the Work by delivering a written directive. To the extent the work directive results in a change to compensation or time, Contractor must timely request a Change Order and comply with all Change Order procedures in accordance with this Article. Notwithstanding issuance of a work directive, Contractor’s failure to timely request a Change Order shall constitute a waiver by Contractor of any adjustment to compensation or time extension for Work performed under the directive. The City shall not be liable to Contractor for Work performed or omitted by Contractor in reliance on verbal orders.

2. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change Order Request, then Contractor shall provide the City with written notice of the underlying facts and circumstances that gave rise to the proposed change within the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) days from the discovery date or prior to the alterations of the conditions, whichever is earlier.
b. If due to a Force Majeure Event, as soon as reasonably practicable under the conditions, which shall be no longer than three (3) days from the date the Contractor discovers that the Force Majeure Event gives rise to a change, unless that the conditions are such that notice within three (3) days is not possible or practicable.
c. If due to any other matter that may involve an adjustment to the Contract Time or the Contract Price, within seven (7) days from the discovery date.

To be considered valid and complete, the notice of change/delay shall include a general statement of the circumstances giving rise to the notice of change/delay and a reasonable order of magnitude estimate of the additional costs and/or time. If the circumstances give rise to both a cost adjustment and time extension, Contractor shall submit the notice of change and notice of delay concurrently.

3. Request for Change in Compensation and/or Extension of Time. Contractor shall submit a Change Order Request for any adjustment to Contractor’s compensation and/or any extension of time. The Change Order Request shall be made prior to incurring any expense and within fourteen (14) days from either Contractor’s notice Packet Page. 1765
Makerspace Room Remodel -72-
00 72 00 – GENERAL CONDITIONS
of change/delay or the City’s directive ordering the change. The Change Order Request shall include all of the following information (unless inapplicable to the change):
a. A detailed description of the circumstances giving rise to the request;
b. A complete itemized cost proposal, including itemized pricing for first tier Subcontractors;
c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical path to completion;
e. If any added costs or information cannot be determined at the time of the Change Order Request, the reason the costs or information cannot be determined at the time; and
f. Certification to the accuracy of the Change Order Request under penalty of perjury.

The time impact analysis shall be in the critical path method format and shall show the sequencing of all critical and non-critical new activities and/or activity revisions affected by the delay, with logic ties to all affected existing activities noted on the schedule.

The City may demand, and Contractor shall provide, any additional information supporting the Change Order Request, including but not limited to native electronic format version of schedules and time impact analyses. Contractor shall provide the requested additional information within five (5) days of the request.

For any costs or information that cannot be determined at the time Contractor submits the Change Order Request, Contractor shall submit to the City notice of the costs or information and all supporting documentation within five (5) days of when the costs or other information become subject to determination.

4. City’s Final Decision on Change Order; Ordered Changes. If the City denies the Change Order Request or disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate price and/or time extension. If no agreement can be reached, the City shall have the right to order the Work performed on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City shall also have the right to order changes in the Work to be performed promptly by the Contractor on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City’s determination shall become final and binding if the Contractor fails to submit a Packet Page. 1766
Makerspace Room Remodel -73-
00 72 00 – GENERAL CONDITIONS
Claim in writing to the City within fourteen (14) days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order and providing such supporting documentation for its position as the City may reasonably require.

5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE

A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE

ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF

THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE

RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH

CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE

OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY

MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY

OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.

Contractor recognizes and acknowledges that timely submission of a formal written notice of change/delay and Change Order Request, whether or not the circumstances of the change may be known to the City or available to the City through other means, is not a mere formality but is of crucial importance to the ability of the City to promptly identify, prioritize, evaluate and mitigate the potential effects of changes. Any form of informal notice, whether verbal or written (including, without limitation, statements in requests for information, statements in Submittals, statements at any job meeting or entries on monthly reports, daily logs or job meeting minutes), that does not strictly comply with the formal requirements of this Article, shall accordingly be insufficient.

6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in compensation or extension of time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change Orders. If so designated, Contractor may only use such forms. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No Claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights.

B. Determining Adjustments to Compensation.

1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work subject to a Change Order except as expressly set forth in this Article. The markup added in instances of Additional Work shall constitute the entire amount of profit, any mark-ups, any field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such Work.

Packet Page. 1767
Makerspace Room Remodel -74-
00 72 00 – GENERAL CONDITIONS

2. Unit Price Change Orders. When the actual quantity of a Unit Price Work item varies from the Bid Schedule, compensation for the change in quantity will be calculated by multiplying the actual quantity by the unit price. This calculation may result in either an additive or deductive Change Order. Bid items included on the Bid Schedule may be deducted from the Work in their entirety without any negotiated extra costs. Because Unit Price Work includes overhead and profit as determined by Contractor at the time of its Bid submission, no mark up or deduction for overhead and profit will be allowed.

3. Lump Sum Change Orders. Whenever possible, any changes affecting compensation shall be in a lump sum mutually agreed by the Contractor and the City.

4. Time and Materials Change Orders. The City may direct the Contractor to proceed with the Additional Work with payment to be made on the basis of actual cost of the labor and materials required to complete the Additional Work. If the Project is federally funded, a time and materials Change Order shall only be issued after a determination that no other Change Order is suitable and the Change Order shall include a ceiling price that the Contractor exceeds at its own risk.

5. Federally Funded Projects. For any change in price to the Contract, general and administrative expenses shall be negotiated and must conform to the cost principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be negotiated as a separate element of the cost. To establish a fair and reasonable profit, consideration must be given to the complexity of the Additional Work to be performed, the risk borne by the Contractor, the Contractor's investment, the amount of subcontracting, the quality of its record of past performance, and industry profit rates in the surrounding geographical area for similar work.

6. Allowed Costs. Estimates for lump sum quotations and accounting for time-andmaterial work shall be limited to direct expenditures necessitated specifically by the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from federal, state or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at Packet Page. 1768
Makerspace Room Remodel -75-
00 72 00 – GENERAL CONDITIONS
equipment rental agencies, or distributors, at the time the work is performed.

The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each items of equipment shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of one thousand dollars ($1,000) or less. (i) The rental time to be paid for equipment shall be the time the equipment is in productive operation on the Additional Work being performed.

Rental time will not be allowed while equipment is inoperative due to breakdowns.
(ii) All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used. Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer. (iii) Before construction equipment is used on any Additional Work, the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City, in duplicate, a description of the equipment and its identifying number. (iv) When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be one half (1/2)-hour of operation, and any part of an hour greater than thirty (30) minutes will be considered one (1) hour of operation. When daily rates are listed, any part of a day less than four (4) hours operation shall be considered to be one half (1/2)-day of operation.
d. Allowed Mark-up. The allowed mark-up for any and all overhead (including supervision and home and field office costs) and profit on work added to the Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and Subcontractors at cost only, without mark-up.

Contractor shall provide the City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark-up shall not exceed fifteen percent (15%) of labor costs, ten percent (10%) of material costs, and ten percent (10%) of the cost of tools and equipment use.
(iii) For Work performed by a Subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost of the Work to which the Contractor may add up to five percent (5%) of the Subcontractor’s Net Cost.

Packet Page. 1769
Makerspace Room Remodel -76-
00 72 00 – GENERAL CONDITIONS
(iv) For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the subsubcontractor’s Net Cost for Work to which the Subcontractor and Contractor may each add up to an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
(v) No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by the City exceed twenty-five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the City’s for an approval signature each day that Work is performed on a time-and-material basis. The Engineer’s signature on time sheets only serves as verification that the Work was performed and is not indicative of the City’s agreement to Contractor’s entitlement to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet, which shall include total actual costs, within five (5) days following completion of Additional Work on a time-and-material basis.

Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and any other costs, along with documentation supporting the costs.

Contractor’s failure to submit the T&M Summary Sheet within five (5) days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the Additional Work.
f. Excluded Costs. The following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by the Contractor’s mark-up, shall not be allowed costs and shall not be included in any lump sum proposals or time-and-materials invoices:
(i) Overhead Cost. Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch offices;
Packet Page. 1770
Makerspace Room Remodel -77-
00 72 00 – GENERAL CONDITIONS
(iii) Capital Expenses. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property;
(v) Small Tools. Cost of small tools valued at less than one thousand dollars ($1,000) and that remain the property of Contractor; (vi) Administrative Costs. Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of Claims;
(vii)Anticipated Lost Profits. Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
(viii) Home Office Overhead. Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny, burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys. Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work.
(x) Other. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents; including but not limited to: submittals, drawings, field drawings, shop drawings, including submissions of drawings; field inspection; general superintendence; computer services; reproduction services; salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial services; small tools, incidentals and consumables; temporary on-site facilities (offices, telephones, high speed internet access, plumbing, electrical power, lighting; platforms, fencing, water); surveying; estimating; protection of work; handling and disposal fees; final cleanup; other incidental work; related warranties; insurance and bond premiums.
(xi) Compliance with Federal Cost Principles. If the Project is federally funded, any costs that are not allowable, reasonable and allocable to the Project, under generally accepted accounting principles and the applicable federal requirements.

Packet Page. 1771
Makerspace Room Remodel -78-
00 72 00 – GENERAL CONDITIONS

9.2 Procedure for Resolving Claims.

Contractor shall timely comply with any and all requirement of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the time for completion or Contractor’s compensation, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.

A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code.

This Article shall be construed to be consistent with all applicable law, including but not limited to these statutes.

B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor for:

1. An adjustment to the time for completion including, without limitation, for relief from damages or penalties for delay assessed by the City;

2. Payment by the City of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or

3. An amount the payment of which is disputed by the City.

A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a Change Order, or otherwise failed to follow any procedures contained in the Contract Documents.

C. Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes any and all requirements of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, and Contractor’s request for a change has been denied in whole or in part.

Claims governed by this Article must be filed no later than thirty (30) days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The Claim shall include the all information and documents necessary to substantiate the Claim, including but not limited to those identified below. Nothing in this Article is intended to extend the time limit or supersede notice requirements otherwise provided by Contract Documents. Failure to follow such contractual requirements shall bar any Claims or subsequent proceedings for compensation or payment thereon.

Packet Page. 1772
Makerspace Room Remodel -79-
00 72 00 – GENERAL CONDITIONS
D. Documentation. The Contractor shall submit all Claims in the following format:

1. Summary description of Claim including basis of entitlement, merit and amount of time or money requested, with specific reference to the Contract Document provisions pursuant to which the Claim is made

2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other

3. Chronology of events and correspondence

4. Narrative analysis of Claim merit

5. Analysis of Claim cost, including calculations and supporting documents

6. Time impact analysis in the form required by the Contract Documents or, if the Contract Documents do not require a particular format, CPM format, if an adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within sixty (60) days after the City issues its written statement.

1. If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim, and the City’s governing body does not meet within the forty-five (45) days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three (3) days following the next duly publicly noticed meeting of the City’s governing body after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.

2. Within thirty (30) days of receipt of a Claim, the City may request in writing additional documentation supporting the Claim or relating to defenses or Claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the City and the Contractor. The City’s written response to the Claim, as further documented, shall be submitted to the Contractor within thirty Packet Page. 1773
Makerspace Room Remodel -80-
00 72 00 – GENERAL CONDITIONS
(30) days (if the Claim is less than fifty thousand ($50,000), within fifteen (15) days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

F. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within fifteen (15) days of receipt of the City’s response or within fifteen (15) days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within thirty (30) days for settlement of the dispute.

G. Mediation. Within ten (10) business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within sixty (60) days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The public entity and Contractor shall mutually agree to a mediator within ten (10) business days after the disputed portion of the Claim has been identified in writing, unless the parties agree to select a mediator at a later time.

1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

2. For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.

3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved Claims shall be considered jointly in a single mediation, unless a new unrelated Claim arises after mediation is completed.

H. Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a Claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.

For purposes of those provisions, the running of the period of time within which a Packet Page. 1774
Makerspace Room Remodel -81-
00 72 00 – GENERAL CONDITIONS
Claim must be filed shall be tolled from the time the Contractor submits his or her written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.

I. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:

1. Within sixty (60) days, but no earlier than thirty (30) Days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code Section 9204 and the terms of this Contract. The mediation process shall provide for the selection within fifteen (15) days by both parties of a disinterested third person as mediator, shall be commenced within thirty (30) days of the submittal, and shall be concluded within fifteen (15) days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

J. Government Code Claim Procedures.

1. This Article does not apply to tort claims and nothing in this Article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commending with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the Government Code.

2. In addition to any and all requirements of the Contract Documents pertaining to notices of and requests for adjustment to the Contract Time, Contract Price, or compensation or payment for Additional Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City.

3. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to adjustment of the Contract Time or Contract Price for Additional Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If Contractor does not comply with Packet Page. 1775
Makerspace Room Remodel -82-
00 72 00 – GENERAL CONDITIONS
the Government Code claim procedure or the prerequisite contractual requirements, Contractor may not file any action against the City.

4. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved Claims known to Contractor or that should reasonably by known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.

K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the Claim being deemed rejected in its entirety, and shall not constitute a waiver of any rights under this Article.

ARTICLE 10 - MEASUREMENT; PAYMENT

10.1 Cost Breakdown.

A. Lump Sum Work.

1. Contractor shall furnish on forms approved by the City within ten (10) days of the Notice to Proceed, a schedule of values allocating the entire Contract Price to the various portions of the Work and prepared in such a form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule of values, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor’s applications for payment. Contractor shall submit the schedule of values prior to submitting its first application for payment, and the City will not issue any payment until it receives and approves the schedule of values.

B. Unit Price Work.

1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work multiplied by the estimated quantity of each item as indicated in the Contract. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s overhead and or profit for each separately identified item.

2. Unless otherwise specified, payment will be based on the actual quantities of Work as verified and approved by the Engineer, based on the price per unit as set forth in the Bid.

3. The City or Contractor may initiate a Change Order or Change Order Request to adjust the Contract Price in accordance with Contractor Documents based on actual quantities of Unit Price Work. The City or Contractor may make a claim for an adjustment in the Unit Price in accordance with the Contract Documents if:

Packet Page. 1776
Makerspace Room Remodel -83-
00 72 00 – GENERAL CONDITIONS
a. the quantity of any item of Unit Price Work performed by Contractor differs by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item of Work; and
c. Contractor believes that Contractor is entitled to an increase in unit price as a result of having incurred additional expense or the City believes that the City is entitled to a decrease in unit price and the parties are unable to agree as to the amount of any such increase or decrease.

10.2 Progress Estimates and Payment.

A. By the tenth (10th) day of the following calendar month, Contractor shall submit to Engineer a payment request which shall set forth in detail the value of the Work done for the period beginning with the date Work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid. Contractor shall include any amount earned for authorized Additional Work. Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

B. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified in the Notice Inviting Bids. From the remainder a further deduction may be made in accordance with Section C below.

The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request.

C. The City may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in its judgment may be necessary to cover:

1. Payments which may be past due and payable for just claims against Contractor or any Subcontractors for labor or materials furnished in and about the performance of work on the Project under this Contract.

2. Defective work not remedied.

3. Failure of Contractor to make proper payments to his Subcontractor or for material or labor.

4. Completion of the Contract if there is a reasonable doubt that the Work can be completed for balance then unpaid.

5. Damage to another contractor or a third party.

6. Amounts which may be due the Count for claims against Contractor.

7. Failure of Contractor to keep the Record Drawings up to date.

Packet Page. 1777
Makerspace Room Remodel -84-
00 72 00 – GENERAL CONDITIONS

8. Failure to provide update on construction schedule as required herein.

9. Site cleanup.

10. Failure to comply with Contract Documents.

11. Liquidated damages.

12. Legally permitted penalties.

D. The City may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of this Article, which must be retained or applied in accordance with applicable law. In so doing, the City shall be deemed the agent of Contractor and any payment so made by the City shall be considered as a payment made under contract by the City to Contractor and the City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The City will render Contractor a proper accounting of such funds disbursed on behalf of Contractor.

E. Upon receipt, the Engineer shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The City shall make the progress payment within thirty (30) days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code Section 8132. The number of days available to the City to make a payment without incurring interest pursuant to this paragraph shall be reduced by the number of days by which the Engineer exceeds the seven (7) day requirement.

F. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the City.

G. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request. The City shall have the right to adjust any estimate of quantity and to correct any error made in any estimate for payment.

B. When the Work has been accepted there shall be paid to Contractor a sum equal to the Contract Price less any amounts previously paid Contractor and less any amounts withheld by the City from Contractor under the terms of the Contract. The final five percent (5%), or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of substantially complete, shall not become due and Packet Page. 1778
Makerspace Room Remodel -85-
00 72 00 – GENERAL CONDITIONS
payable until as required by Public Contract Code Section 7107. If the Contractor has placed securities with the City as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the Contract Price less any amounts due the City under the terms of the Contract.

C. Unless Contractor advises the City in writing prior to acceptance of the final five percent (5%) or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of completion, or the return of securities held as described herein, said acceptance shall operate as a release to the City of all claims and all liability to Contractor for all things done or furnished in connection with this Work and for every act of negligence of the City and for all other claims relating to or arising out of this Work. If Contractor advises the City in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the City may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the City with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this Contract.

D. In case of suspension of the Contract any unpaid balance shall be and become the sole and absolute property of the City to the extent necessary to repay the City any excess in the cost of the Work above the Contract Price.

E. Final payment shall be made no later than sixty (60) Days after the date of acceptance of the Work by the City or the date of occupation, beneficial use and enjoyment of the Work by the City including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code Section 8136. In the event of a dispute between the City and the Contractor, the City may withhold from the final payment an amount not to exceed one hundred fifty percent (150%) of the disputed amount.

F. Within ten (10) days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its Subcontractors from whom retention has been withheld each Subcontractor’s share of the retention received. However, if a retention payment received by Contractor is specifically designated for a particular Subcontractor, payment of the retention shall be made to the designated Subcontractor if the payment is consistent with the terms of the subcontract.

ARTICLE 11 - MISCELLANEOUS

11.1 Patents.

A. Contractor shall hold and save the City, officials, officers, employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this Contract.

Packet Page. 1779
Makerspace Room Remodel -86-
00 72 00 – GENERAL CONDITIONS

11.2 Document Retention & Examination
A. In accordance with Government Code Section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.

B. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City.

C. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

11.3 Notice.

A. All notices shall be in writing and either served by personal delivery or mailed to the other party. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to the City shall be addressed to the City as designated in the Notice Inviting Bids unless the City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code Section 9201, the City shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract.

The City is entitled to recover reasonable costs incurred in providing such notification.

11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the City. Any assignment or change of Contractor’s name of legal entity without the written consent of the City shall be void. Any assignment of money due or to Packet Page. 1780
Makerspace Room Remodel -87-
00 72 00 – GENERAL CONDITIONS
become due under this Contract shall be subject to a prior lien for services rendered or material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

11.7 Change In Name And Nature Of Contractor’s Legal Entity.

A. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect the City’s rights under the Contract, including but not limited to the bonds.

11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall be governed by the law of the State of California excluding any choice of law provisions.

11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of San Bernardino County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.

11.11 Cumulative Remedies.

A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Applicable Laws, by special warranty or guarantee, or by other provisions of the Contract Documents.

The provisions of this Article will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.

Packet Page. 1781
Makerspace Room Remodel -88-
00 72 00 – GENERAL CONDITIONS

11.12 Survival of Obligations.

A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.

11.13 Headings.

A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions.

11.14 Assignment of Antitrust Actions
A. In accordance with California Public Contract Code Section 7103.5(b), Contractor and Subcontractors must conform to the following requirements:

1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract.

2. This assignment must be made and become effective at the time the awarding body tenders to Contractor, without further acknowledgment by the parties.

11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify City in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in Work. If Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to City, he shall bear all costs arising therefrom.

B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.

C. Contractor acknowledges and understands that, pursuant to Public Contract Code section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.

Packet Page. 1782
Makerspace Room Remodel -89-
00 72 00 – GENERAL CONDITIONS
D. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Work, shall be or become directly or indirectly interested financially in the Contract.

E. All provisions of law required to be inserted in the Contract or Contract Documents pursuant to any Applicable Laws shall be and are inserted herein. If through mistake, neglect, oversight, or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Contract or Contract Documents shall be changed by City, at no increase in Contract Price or extension in Contract Times, so as to strictly comply with the Applicable Laws and without prejudice to the rights of either party hereunder

11.16 Electronic Signature. Each Party acknowledges and agrees that this Agreement may be executed by electronic or digital signature, which shall be considered as an original signature for all purposes and shall have the same force and effect as an original signature ARTICLE 12 -– FLEET COMPLIANCE

12.1 To the extent applicable, Contractor, shall comply, and shall ensure all subcontractors comply, with all requirements of the most current version of the California Air Resources Board (“CARB”) including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).

12.2 Throughout Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and subcontractors’ fleet including, without limitation, the CRCs, fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

12.3 Contractor shall be solely liable for any and all costs associated with complying with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.

Packet Page. 1783
Makerspace Room Remodel 90 00 73 13 - SPECIAL CONDITIONS 00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 -SCOPE OF WORK

1.1 Location of the Project.

A. 555 W 6th St, San Bernardino, CA 92410
Packet Page. 1784
Makerspace Room Remodel 91 00 73 13 - SPECIAL CONDITIONS

1.2 Scope of Work.

A. The Scope of Work consists of:

The work consists of, but is not limited to, demolition, metal stud framing, door and window installation, acoustic wall and ceiling tile panel installation, concrete floor polishing, HVAC (supply, return registers, and ductwork), plumbing, and electrical work.

ARTICLE 2 -REQUIRED DOCUMENTS FOR PAY APPLICATION
Each monthly or milestone invoice from the General Contractor must include:

1. Contractor’s Invoice and Schedule of Values (SOV)
o Must reflect cumulative progress to date.
o Each line item should correspond to measurable work completed and/or materials supplied.

2. Subcontractor Invoices
o Each subcontractor listed in the SOV must submit a corresponding invoice. o Invoices should specify labor, materials, and equipment consistent with progress reports.

3. Subcontractor Conditional/Unconditional Releases
o Conditional Waiver and Release on Progress Payment (Civil Code §8132) for partial payments.
o Unconditional Waiver and Release on Progress Payment (Civil Code §8134) once payment is made.
o Final Waivers (Civil Code §§8136–8138) upon project completion.

4. Material Supplier Documentation
o Invoices for materials incorporated into the project. o Corresponding lien releases from suppliers to subcontractors or the GC. o Delivery tickets or packing slips verifying material delivery to site.

5. Certified Payroll Records (CPRs)
o Weekly payroll reports for all contractors and subcontractors (Labor Code §1776).
o Must match reported progress and labor hours billed.
o Electronic submission via the Department of Industrial Relations (DIR) is required.

Packet Page. 1785
Makerspace Room Remodel 92 00 73 13 - SPECIAL CONDITIONS

6. Apprenticeship Compliance Documentation
o Evidence of registered apprentices (Labor Code §1777.5). o Proof of training contributions.

7. Inspection Reports / Field Verification
o Inspection logs confirming percent completion of each SOV line item. o Field engineer sign-off on progress estimates.

8. Retention and Withholding Summary
o Confirmation of 5% retention per Public Contract Code §9203. o Identification of withheld funds for non-compliant documentation.

ARTICLE 3 -MODIFICATIONS TO THE GENERAL CONDITIONS
Section not used.

END OF SPECIAL CONDITIONS
Packet Page. 1786
Makerspace Room Remodel 93 SPECIFICATIONS

SPECIFICATIONS
"THE FOLLOWING SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:

1. Specifications for City of San Bernardino Maker Space Room Remodel at the Feldheym Library
Packet Page. 1787
Makerspace Room Remodel 94 PLANS AND DRAWINGS

PLANS AND DRAWINGS
"THE FOLLOWING PLANS AND DRAWINGS ARE INCORPORATED HEREIN BY REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:

1. City of San Bernardino Maker Space Room Remodel at The Feldheym Library Building Packet Page. 1788
Makerspace Room Remodel 95 PLANS AND DRAWINGS

COMPLIANCE WITH AMERICAN RESCUE PLAN ACT (ARPA) CORONAVIRUS LOCAL

FISCAL RECOVERY FUND (CLFRF) FEDERAL GUIDELINES USE OF ARPA CLFRF AND

REQUIREMENTS
This Contract may be funded in whole or in part with funds provided by the American Rescue Plan Act - Coronavirus Local Fiscal Recovery Fund (ARPA), Federal Award Identification Number (FAIN): SLT0628 and Assistance Listing Number (formerly known as a CFDA number):

21.027, and therefore Contractor agrees to comply with any and all ARPA requirements in addition to any and all applicable County, State, and Federal laws, regulations, policies, and procedures pertaining to the funding of this Contract. The use of the funds must also adhere to official federal guidance issued or to be issued on what constitutes a necessary expenditure. Any funds expended by Contractor or its subcontractor(s) in any manner that does not adhere to the ARPA requirements shall be returned or repaid to the City or County. Any funds paid to Contractor i) in excess of the amount to which Contractor is finally determined to be authorized to retain; ii) that are determined to have been misused; or iii) that are determined to be subject to a repayment obligation pursuant to section 603(e) of the Act and have not been repaid, shall constitute a debt to the federal government. Contractor agrees to comply with the requirements of section 603 of the Act, regulations adopted by Treasury pursuant to the Act, and guidance issued by Treasury regarding the foregoing. Contractor shall provide for such compliance in any agreements with subcontractor(s).

Contractor agrees to comply with the following:

A. In accordance with Title 2 Code of Federal Regulations (C.F.R.) Section 200.322, the nonFederal Contractor should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award. For purposes of this section: “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States. “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.

B. In accordance with Title 2 C.F.R. Section 200.471, costs incurred for telecommunications and video surveillance services or equipment such as phones, internet, video surveillance, cloud servers are allowable except for the following circumstances: Obligating or expending covered telecommunications and video surveillance services or equipment or services (as described in Title 2 C.F.R. Section 200.216) to: 1) Procure or obtain, extend or renew a contract to procure or obtain; 2) Enter into a contract (or extend or renew a contract) to procure; or 3) Obtain the equipment, services, or systems, as described in Title 2 C.F.R. Section 200.216 that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232, section 889, covered telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities) and: (i) For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Packet Page. 1789
Makerspace Room Remodel 96 PLANS AND DRAWINGS
Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); (ii) Telecommunications or video surveillance services provided by such entities or using such equipment; and (iii) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. In implementing the prohibition under Public Law 115-232, section 889, subsection (f), paragraph (1), heads of executive agencies administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users and customers is sustained.

C. A non-Federal Contractor that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at Title 40 C.F.R. Part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

D. Byrd Anti-Lobbying Amendment (31 U.S.C. Section 1352) - Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by Title 31 U.S.C. Section 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.

E. Clean Air Act (42 U.S.C. Sections 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. Sections 1251-1389), as amended - Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non-Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. Sections 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. Sections1251-1389).

F. Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under Title 37 C.F.R. Section 401.2(a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the Title 33 U.S.C. Sections 1251-1387 recipient or subrecipient must comply with the requirements of Title 37 C.F.R. Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency.

Packet Page. 1790
Makerspace Room Remodel 97 PLANS AND DRAWINGS
G. Contract Work Hours and Safety Standards Act (40 U.S.C. Sections 3701-3708). Where applicable, all contracts awarded by the non-Federal Contractor in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with Title 40 U.S.C. Sections 3702 and 3704, as supplemented by Department of Labor regulations (29 C.F.R. Part 5). Under Title 40 U.S.C. Section 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of Title 40 U.S.C.

Section 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous to health or safety. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

H. Davis-Bacon Act, as amended (40 U.S.C. Sections 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C.

Sections 3141-3148) as supplemented by Department of Labor regulations (29 C.F.R. Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal contractor must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal Contractor must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (18 U.S.C. Section 874 and 40 U.S.C. Section 3145), as supplemented by Department of Labor regulations (29 C.F.R.

Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal contractor must report all suspected or reported violations to the Federal awarding agency.
i. The Contractor and all Subcontractors and Sub-subcontractors are required to pay their employees and workers a wage not less than the minimum wage for the work classification as specified in both the Federal and California wage decisions. See Section 3.10.6 “Prevailing Wages” for additional information regarding California Prevailing Wage Rate Requirements and the applicable general prevailing wage determinations which are on file with the City and are available to any interested party on request. The higher of the two applicable wage determinations, either California prevailing wage or Davis-Bacon Federal prevailing wage, will be enforced for all applicable work/services under this Contract.

I. Contracts for more than the simplified acquisition threshold, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by Title 41 U.S.C. Section 1908, must address Packet Page. 1791
Makerspace Room Remodel 98 PLANS AND DRAWINGS
administrative, contractual, or legal remedies in instances where Contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate.

J. All contracts in excess of $10,000 must address termination for cause and for convenience by the non-Federal Contractor including the manner by which it will be effected and the basis for settlement.

K. Equal Employment Opportunity. Except as otherwise provided under Title 41 C.F.R. Part 60, all contracts that meet the definition of “federally assisted construction contract” in Title 41 C.F.R. Section 60-1.3 must include the equal opportunity clause provided under Title 41 C.F.R. Section 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 C.F.R. Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 C.F.R. part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” The identified clause is below and Contractor shall comply with the clause and all legal requirements and include the equal opportunity clause in each of its nonexempt subcontracts. i. The applicant hereby agrees that it will incorporate or cause to be incorporated into any contract for construction work, or modification thereof, as defined in the regulations of the Secretary of Labor at Title 41 C.F.R. Chapter 60, which is paid for in whole or in part with funds obtained from the Federal Government or borrowed on the credit of the Federal Government pursuant to a grant, contract, loan, insurance, or guarantee, or undertaken pursuant to any Federal program involving such grant, contract, loan, insurance, or guarantee, the following equal opportunity clause:

During the performance of this contract, the contractor agrees as follows:
(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin.

The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation Packet Page. 1792
Makerspace Room Remodel 99 PLANS AND DRAWINGS
conducted by the employer, or is consistent with the contractor's legal duty to furnish information.
(4) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
(5) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and the rules, regulations, and relevant orders of the Secretary of Labor. (6) The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
(8) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance:

Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the contractor may request the United States to enter into such litigation to protect the interests of the United States.

The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, That if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract.

The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.

The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry Packet Page. 1793
Makerspace Room Remodel 100 PLANS AND DRAWINGS
out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings.

L. Data Collection Requirements – Contractor agrees to collect pre-post data per County, and United States Treasury guidelines and timeline, for project tracking and monitoring and various reporting purposes. Data including, but not limited to: Required Project Demographic Distribution Data; Required Performance Indicators and Programmatic Data; Required Expenditure Report Data; and Required Program Evaluation Data. Contractor agrees to track and monitor data in a quantifiable and reportable database - retrievable collective data that needs to be available to County, State or Federal governments upon request.

M. Data Submission Requirements - Contractor agrees to furnish data to the County upon request, per County, and United States Treasury guidelines and timeline, for project tracking and monitoring and various reporting purposes. Data including, but not limited to: Required Project Demographic Distribution Data; Required Performance Indicators and Programmatic Data; Required Expenditure Report Data; Required Program Evaluation Data. Contractor agrees to track and monitor data in a quantifiable and reportable database - retrievable collective data that needs to be available at request.

N. Project Progress Reporting - Contractor agrees to provide project timeline and progress updates to the City upon request, per County, and United States Treasury guidelines and timeline. Contractor agrees to routine and impromptu program and project evaluation by the City.

O. Contractor shall comply with Title 2 Code of Federal Regulations Part 200 (Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards), including, but not limited to, Title 2 C.F.R. Section 200.303 (internal control), Title 2 C.F.R.

Sections 200.331 through 200.333 (subrecipient monitoring and management), and Title 2 C.F.R. Part 200 Subpart F (audit requirements), as these sections currently exist or may be amended. The use of funds must also adhere to official federal guidance issued or to be issued on what constitutes an eligible expenditure. Any funds expended by Contractor or its subcontractor(s) in any manner that does not adhere to official federal guidance shall be returned to the County. Contractor agrees to comply with all official guidance regarding the ARPA CLFRF. Contractor also agree that as additional federal guidance becomes available, an amendment to this Contract may become necessary. If an amendment is required, Contractor agrees to promptly execute the Contract amendment.

P. Contractor shall retain documentation of all uses of the funds, including but not limited to invoices and/or sales receipts in a manner consistent with Title 2 C.F.R. Section 200.334 (retention requirements for records). Such documentation shall be produced to City upon request and may be subject to audit. Unless otherwise provided by Federal or State law (whichever is the most restrictive), Contractor shall maintain all documentation connected with its performance under this Contract for a minimum of five (5) years from the date of the last Packet Page. 1794
Makerspace Room Remodel 101 PLANS AND DRAWINGS
payment made by City or until audit resolution is achieved, whichever is later, and to make all such supporting information available for inspection and audit by representatives of the City, the State or the United States Government during normal business hours at Contractor.

Copies will be made and furnished by Contractor upon written request by City.

Q. Contractor shall establish and maintain an accounting system conforming to Generally Accepted Accounting Principles (GAAP) to support Contractor’s requests for reimbursement which segregate and accumulate costs of Contractor and produce monthly reports which clearly identify reimbursable costs, matching fund costs (if applicable), and other allowable expenditures by Contractor. Contractor shall provide a monthly report of expenditures under this Contract no later than the 20th day of the following month.

R. Contractor shall cooperate in having an audit completed by City, at City’s option and expense.

Any audit required by ARPA CLFRF and its regulation and United States Treasury guidance will be completed by Contractor at Contractor’s expense.

S. Contractor shall repay to City any reimbursement for ARPA CLFRF funding that is determined by subsequent audit to be unallowable under the ARPA CLFRF within the time period required by the ARPA CLFRF, but no later than one hundred twenty (120) days of Contractor receiving notice of audit findings, which time shall include an opportunity for Contractor to respond to and/or resolve the findings. Should the findings not be otherwise resolved and Contractor fail to reimburse moneys due City within one hundred twenty (120) days of audit findings, or within such other period as may be agreed between both parties or required by the ARPA CLFRF, City reserves the right to withhold future payments due Contractor from any source under City’s control.

T. Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, Title 2 C.F.R. Part 200, other than such provisions as Treasury may determine are inapplicable and subject to such exceptions as may be otherwise provided by Treasury.

Subpart F – Audit Requirements of the Uniform Guidance, implementing the Single Audit Act, shall apply.

U. Universal Identifier and System for Award Management (SAM), Title 2 C.F.R. Part 25.

V. Reporting Subaward and Executive Compensation Information, Title 2 C.F.R. Part 170.

W. OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (nonprocurement), Title 2 C.F.R. Part 180, including the requirement to include a term or condition in all lower tier covered transactions (contracts and subcontracts described in 2 C.F.R. Part 180, subpart B) that the award is subject to Title 2 C.F.R. Part 180 and Treasury’s implementing regulation at Title 31 C.F.R. Part 19. Debarment and Suspension (Executive Orders 12549 and 12689) - A contract award (see 2 C.F.R. Section 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at Title 2 C.F.R. Part 180 that implement Executive Orders 12549 (3 C.F.R. Part 1986 Comp., p. 189) and 12689 (3 C.F.R.

Part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549.

X. Recipient Integrity and Performance Matters, pursuant to which the award terms set forth in Title 2 C.F.R. Part 200, Appendix XII to Part 200 is hereby incorporated by reference.

Packet Page. 1795
Makerspace Room Remodel 102 PLANS AND DRAWINGS
Y. Government Requirements for Drug-Free Workplace, Title 31 C.F.R. Part 20.

Z. New Restrictions on Lobbying, Title 31 C.F.R. Part 21.

AA. Uniform Relocation Assistance and Real Property Acquisitions Act of 1970 (42 U.S.C.

Sections 4601-4655) and implementing regulations.

BB. Applicable Federal environmental laws and regulations.

CC. Statutes and regulations prohibiting discrimination include, without limitation, the following:
i. Title VI of the Civil Rights Act of 1964 (42 U.S.C. Sections 2000d et seq.) and Treasury’s implementing regulations at Title 31 C.F.R. Part 22, which prohibit discrimination on the basis of race, color, or national origin under programs or activities receiving federal financial assistance.
ii. The Fair Housing Act, Title VIII of the Civil Rights Act of 1968 (42 U.S.C. Sections 3601 et seq.), which prohibits discrimination in housing on the basis of race, color, religion, national origin, sex, familial status, or disability. iii. Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. Section 794), which prohibits discrimination on the basis of disability under any program or activity receiving federal financial assistance.
iv. The Age Discrimination Act of 1975, as amended (42 U.S.C. Sections 6101 et seq.), which prohibits discrimination on the basis of disability under programs, activities, and services provided or made available by state and local governments or instrumentalities or agencies thereto.
v. Title II of the Americans with Disabilities Act of 1990, as amended (42 U.S.C. Sections 12101 et seq.), which prohibits discrimination on the basis of disability under programs, activities, and services provided or made available by state and local governments or instrumentalities or agencies thereto.

DD. Contractor understands that making false statements or claims in connection with the ARPA funded activities is a violation of federal law and may result in criminal, civil, or administrative sanctions, including fines, imprisonment, civil damages and penalties, debarment from participating in federal awards or contracts, and/or any other remedy available by law.

EE. Any publications produced with ARPA funds must display the following language: “This project [is being] [was] supported, in whole or in part, by federal award number SLT-0628 awarded to San Bernardino County by the U.S. Department of Treasury.” FF. Pursuant to Executive Order 13043, 62 FR 19217 (Apr. 18, 1997), Contractor is being encouraged to adopt and enforce on-the-job seat belt policies and programs for their employees when operating company-owned, rented, or personally owned vehicles.

GG. Pursuant to Executive Order 13513, 74 FR 51225 (Oct. 6, 2009), Contractor is being encouraged to adopt and enforce policies that ban text messaging while driving and establishing workplace safety policies to decrease accidents caused by distracted drivers.

HH. As a recipient of federal financial assistance, the Civil Rights Restoration Act of 1987 applies, and Contractor assures that it:

Packet Page. 1796
Makerspace Room Remodel 103 PLANS AND DRAWINGS
i. Ensures its current and future compliance with Title VI of the Civil Rights Act of 1964, as amended, which prohibits exclusion from participation, denial of the benefits of, or subjection to discrimination under programs and activities receiving federal funds, of any person in the United States on the ground of race, color, or national origin (42 U.S.C. Sections 2000d et seq.), as implemented by the Department of the Treasury Title VI regulations at Title 31 C.F.R. Part 22 and other pertinent executive orders such as Executive Order 13166, directives, circulars, policies, memoranda and/or guidance documents.
ii. Acknowledges that Executive Order 13166, “Improving Access to Services for Persons with Limited English Proficiency,” seeks to improve access to federally assisted programs and activities for individuals who, because of national origin, have Limited English proficiency (LEP). Contractor understands that denying a person access to its programs, services, and activities, because of LEP is a form of national origin discrimination prohibited under Title VI of the Civil Rights Act of 1964 and the Department of the Treasury’s implementing regulations. Contractor shall initiate reasonable steps, or comply with the Department of the Treasury’s directives, to ensure LEP persons have meaningful access to its programs, services, and activities.

Contractor understands and agrees that meaningful access may entail provide language assistance services, including oral interpretation and written translation where necessary, to ensure effective communication.
iii. Agrees to consider the need for language services for LEP persons during development of applicable budgets and when conducting programs, services, and activities.
iv. Agrees to maintain a complaint log of any complaints of discrimination on the grounds of race, color, or national origin, and limited English proficiency covered by Title VI of the Civil Rights Act and implementing regulations and provide, upon request, a list of all such reviews or proceedings based on the complaint, pending or completed, including outcome.

II. The City must include the following language in every contract or agreement subject to Title VI and its regulations:
“The sub-grantee, contractor, successor, transferee, and assignee shall comply with Title VI of the Civil Rights Act of 1964, which prohibits recipients of federal financial assistance from excluding a program or activity, denying benefits of, or otherwise discriminating against a person on the basis of race, color, or nation origin (42 U.S.C. Section 2000d et seq.), as implemented by the Department of the Treasury’s Title VI regulations, Title 31 C.F.R. Part 22, which are herein incorporated by reference and made a part of this contract (or agreement). Title VI also includes protection to persons with “Limited English Proficiency” in any program or activity receiving federal financial assistance, 42 U.S.C.

Section 2000d et seq., as implemented by the Department of the Treasury’s Title VI regulations, Title 31 C.F.R. Sections Part 22, and herein incorporated by reference and made a part of this contract or agreement.”
JJ. Contractor shall cooperate in any enforcement or compliance review activities by the City, and/or the Department of the Treasury. Contractor shall comply with information requests, on-site compliance reviews, and reporting requirements.

KK. Contractor shall maintain records and financial documents sufficient to evidence compliance with section 603(c), regulations adopted by Treasury implementing those sections, and guidance issued by Treasury regarding the foregoing.

Packet Page. 1797
Makerspace Room Remodel 104 PLANS AND DRAWINGS
LL.City has the right of access to records (electronic or otherwise) of Contractor in order to conduct audits or other investigations.

MM. Contractor shall maintain records for a period of five (5) years after the completion of the contract or a period of five (5) years after the last reporting date the City is obligated with the Department of the U.S. Treasury, whichever is later.

NN. Contractor must disclose in writing any potential conflict of interest in accordance with Title 2 C.F.R. Section 200.112.

OO. In accordance with Title 41 U.S.C. Section 4712, subrecipient or Contractor may not discharge, demote, or otherwise discriminate against an employee in reprisal for disclosing to any of the list of persons or entities provided below, information that the employee reasonably believes is evidence of gross mismanagement of a federal contract or grant, a gross waste of federal funds, an abuse of authority relating to a federal contract or grant, a substantial and specific danger to public health or safety, or a violation of law, rule, or regulation related to a federal contract (including the competition for or negotiation of a contract) or grant.

The list of persons and entities referenced in the paragraph above includes the following: (i) A member of Congress or a representative of a committee of Congress; (ii) An Inspector General; (iii) The Government Accountability Office; (iv) A Treasury employee responsible for contract or grant oversight or management; (v) An authorized official of the Department of Justice or other law enforcement agency; (vi) A court or grand jury; or (vii) A management official or other employee of Recipient, subrecipient, contractor, or subcontractor who has the responsibility to investigate, discover, or address misconduct. Subrecipient or Contractor shall inform its employees in writing of the rights and remedies provided under this section, in the predominant native language of the workforce.

PP. City and Contractor acknowledge that if additional federal guidance is issued, an amendment to this Contract may be necessary. In the event any of the terms in this Exhibit conflict with any other terms in the Contract, the terms in this Exhibit shall control.

Packet Page. 1798
Quantity Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 MOBILIZATION AND OTHER REQUIREMENTS 1 LS $ 11,940.00 $ 11,940.00 $ 36,000.00 $ 36,000.00 $ 35,547.00 $ 35,547.00 $ 65,000.00 $ 65,000.00 $ 15,000.00 $ 15,000.00

2.1 BUILDING DEMO AND REMOVAL - INTERIOR WALL PARTITIONS, WINDOW PARTITIONS, DOORS,

CARPET TILE, BUILT-IN COUNTER, SHELVES, GYPSUM BOARD, WINDOW BLINDS, SIGNAGE, LIGHT

SWITCHES, OUTLETS, LIGHT FIXTURES, ACOUSTICAL CEILING TILES, SELECTIVE DEMOLITION 1 LS
$ 27,000.00 $ 27,000.00 $ 42,000.00 $ 42,000.00 $ 15,782.00 $ 15,782.00 $ 29,777.00 $ 29,777.00 $ 29,436.00 $ 29,436.00

5.1 METAL STUD FRAMING at INTERIOR 1 LS $ 18,000.00 $ 18,000.00 $ 21,000.00 $ 21,000.00 $ 43,016.00 $ 43,016.00 $ 7,525.00 $ 7,525.00 $ 19,500.00 $ 19,500.00

7.1 PIPE INSULATION WRAP 1 EA $ 1,080.00 $ 1,080.00 $ 1,000.00 $ 1,000.00 $ 631.00 $ 631.00 $ 900.00 $ 900.00 $ 2,089.00 $ 2,089.00

8.1 NEW FIRE RATED METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA $ 4,800.00 $ 4,800.00 $ 5,500.00 $ 5,500.00 $ 5,924.00 $ 5,924.00 $ 12,000.00 $ 12,000.00 $ 8,750.00 $ 8,750.00

8.2 NEW FIRE RATED DOUBLE METAL DOOR AND METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA $ 9,480.00 $ 9,480.00 $ 5,500.00 $ 5,500.00 $ 7,901.00 $ 7,901.00 $ 9,000.00 $ 9,000.00 $ 19,063.00 $ 19,063.00

8.2 NEW DOOR THRESHOLD 1 EA $ 600.00 $ 600.00 $ 1,000.00 $ 1,000.00 $ 876.00 $ 876.00 $ 2,000.00 $ 2,000.00 $ 313.00 $ 313.00

9.1 ACOUSTICALCEILING TILE PANELS 24 x 48 20 EA $ 150.00 $ 3,000.00 $ 150.00 $ 3,000.00 $ 1,139.00 $ 22,780.00 $ 685.00 $ 13,700.00 $ 345.00 $ 6,900.00

9.2 ACOUSTICALWALL PANELS 621 SF $ 33.00 $ 20,493.00 $ 10.00 $ 6,210.00 $ 22.39 $ 13,904.19 $ 54.00 $ 33,534.00 $ 18.00 $ 11,178.00

9.3 GYPSUM BOARD 1 LS $ 13,200.00 $ 13,200.00 $ 11,000.00 $ 11,000.00 $ 27,179.00 $ 27,179.00 $ 6,300.00 $ 6,300.00 $ 26,500.00 $ 26,500.00

9.4 POLISH CONCRETE 1,640 SF $ 10.80 $ 17,712.00 $ 10.00 $ 16,400.00 $ 9.34 $ 15,317.60 $ 6.71 $ 10,999.48 $ 24.33 $ 24,300.00

9.5 RUBBER BASE 1 LS $ 2,400.00 $ 2,400.00 $ 1,000.00 $ 1,000.00 $ 3,283.00 $ 3,283.00 $ 7,000.00 $ 7,000.00 $ 500.00 $ 500.00

10.1 REINSTALLATION OF EXISITNG HALL SIGNAGE & PICTURES 1 LS $ 1,560.00 $ 1,560.00 $ 1,000.00 $ 1,000.00 $ 402.00 $ 402.00 $ 1,000.00 $ 1,000.00 $ 2,452.00 $ 2,452.00

10.2 TACTILE EXIST SIGNAGE ON WALL 2 EA $ 204.00 $ 408.00 $ 700.00 $ 1,400.00 $ 224.00 $ 448.00 250.00 $ 500.00 $ 742.00 $ 1,484.00

10.3 ACCESS PANEL FOR PLUMBING VALVES 1 EA $ 384.00 $ 384.00 $ 500.00 $ 500.00 $ 304.00 $ 304.00 $ 186.20 $ 186.20 $ 1,947.00 $ 1,947.00

10.4 SURFACE MOUNTED LIQUID SOAP DISPENSER 1 EA $ 300.00 $ 300.00 $ 1,200.00 $ 1,200.00 $ 189.00 $ 189.00 $ 186.20 $ 186.20 $ 742.00 $ 742.00

10.5 PAPER TOWEL DISPENSER/WASTE RECETACLE - RECESS MOUNTED 1 EA $ 900.00 $ 900.00 $ 1,900.00 $ 1,900.00 $ 396.00 $ 396.00 $ 186.20 $ 186.20 $ 4,112.00 $ 4,112.00

11.1 FAUCET 1 LS $ 21,000.00 $ 21,000.00 $ 16,000.00 $ 16,000.00 $ - $ - $ 2,500.00 $ 2,500.00 $ 8,356.00 $ 8,356.00

15.1 SUPPLY,RETURN REGISTERS AND ANY DUCT EXTENTION NEEDED 1 LS $ 15,600.00 $ 15,600.00 $ 3,000.00 $ 3,000.00 $ 4,512.00 $ 4,512.00 $ 5,000.00 $ 5,000.00 $ 4,563.00 $ 4,563.00

22.1 SUPPLY, SEWER, VENT PIPING 1 LS $ 12,000.00 $ 12,000.00 $ 2,500.00 $ 2,500.00 $ 13,747.00 $ 13,747.00 $ 7,000.00 $ 7,000.00 $ 16,043.00 $ 16,043.00

22.2 SHUT OFF VALVES FOR COLD AND HOT WATER 2 EA $ 360.00 $ 720.00 $ 1,000.00 $ 2,000.00 $ 281.50 $ 563.00 $ 3,500.00 $ 7,000.00 $ 1,250.00 $ 2,500.00

26.1 SERVICE, POWER, SWITCHING, DISTRIBUTION 1 LS $ 18,403.00 $ 18,403.00 $ 22,000.00 $ 22,000.00 $ 19,700.00 $ 19,700.00 $ 7,200.00 $ 7,200.00 $ 2,904.00 $ 2,904.00

26.2 NEW OCCUPANCY SENSOR 2 EA $ 420.00 $ 840.00 $ 700.00 $ 1,400.00 $ 447.50 $ 895.00 $ 1,000.00 $ 2,000.00 $ 850.00 $ 1,700.00

26.3 NEW ILLUMINTED EXIST SIGNAGE 2 EA $ 576.00 $ 1,152.00 $ 1,200.00 $ 2,400.00 $ 442.00 $ 884.00 $ 775.00 $ 1,550.00 $ 742.00 $ 1,484.00

26.4 REPLACE LIGHT FIXTURE: WITH NEW 4' LINEAR LED RECESS LIGHT FIXTURE 20 EA $ 432.00 $ 8,640.00 $ 800.00 $ 16,000.00 $ 717.50 $ 14,350.00 $ 875.00 $ 17,500.00 $ 1,100.00 $ 22,000.00

26.5 REPLACE LIGHT FIXTURE: WITH NEW 6' ROUND LED RECESS LIGHT FIXTURE 3 EA $ 396.00 $ 1,188.00 $ 400.00 $ 1,200.00 $ 396.00 $ 1,188.00 $ 867.00 $ 2,601.00 $ 500.00 $ 1,500.00

26.6 DATA AND COMMUNICATIONS CONDUITS ONLY 1 LS $ 6,000.00 $ 6,000.00 $ 4,000.00 $ 4,000.00 $ 1,263.00 $ 1,263.00 $ 2,025.00 $ 2,025.00 $ 3,650.00 $ 3,650.00

26.7 MISCELLANEOUS IT CABLING AND OTHER RELATED WORK 1 EA $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ - $ - $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 28 29
30 31
32 Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
$238,800.00 $246,110.00 $250,981.79 $274,170.08 $258,966.00 $238,800.00 $246,110.00 $250,981.79 $ 258,341.00 $265,021.00 Apparent Low Bidder 3 Apparent Low Bidder 5

EARTH GENERAL

CONSTRUCTION

BID ITEM & DESCRIPTION

BID RANKING

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

RS CONSTRUCTION &
DEVELOPMENT INC.

1. BID TABULATION
PROJECT NAME: FELDHEYM CENTRAL LIBRARY MAKERSPACE ROOM REMODEL PROJECT NO:

BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2

ESTATE DESIGN &
CONSTRUCTION INC.

ALL AMERICAN BUILDING

SERVICES
Apparent Low Bidder 4

STEADY SOLUTIONS
S:\ENGINEERING\RFCA's\2026 All\06-03-2026\Feldheym Library Makerspace\BID TABULATION & REFERENCE CHECK.xlsxBID TABULATION 1 of 3 PktP1799
Quantity Unit
1 MOBILIZATION AND OTHER REQUIREMENTS 1 LS

2.1 BUILDING DEMO AND REMOVAL - INTERIOR WALL PARTITIONS, WINDOW PARTITIONS, DOORS,

CARPET TILE, BUILT-IN COUNTER, SHELVES, GYPSUM BOARD, WINDOW BLINDS, SIGNAGE, LIGHT

SWITCHES, OUTLETS, LIGHT FIXTURES, ACOUSTICAL CEILING TILES, SELECTIVE DEMOLITION 1 LS

5.1 METAL STUD FRAMING at INTERIOR 1 LS

7.1 PIPE INSULATION WRAP 1 EA

8.1 NEW FIRE RATED METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA

8.2 NEW FIRE RATED DOUBLE METAL DOOR AND METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA

8.2 NEW DOOR THRESHOLD 1 EA

9.1 ACOUSTICALCEILING TILE PANELS 24 x 48 20 EA

9.2 ACOUSTICALWALL PANELS 621 SF

9.3 GYPSUM BOARD 1 LS

9.4 POLISH CONCRETE 1,640 SF

9.5 RUBBER BASE 1 LS

10.1 REINSTALLATION OF EXISITNG HALL SIGNAGE & PICTURES 1 LS

10.2 TACTILE EXIST SIGNAGE ON WALL 2 EA

10.3 ACCESS PANEL FOR PLUMBING VALVES 1 EA

10.4 SURFACE MOUNTED LIQUID SOAP DISPENSER 1 EA

10.5 PAPER TOWEL DISPENSER/WASTE RECETACLE - RECESS MOUNTED 1 EA

11.1 FAUCET 1 LS

15.1 SUPPLY,RETURN REGISTERS AND ANY DUCT EXTENTION NEEDED 1 LS

22.1 SUPPLY, SEWER, VENT PIPING 1 LS

22.2 SHUT OFF VALVES FOR COLD AND HOT WATER 2 EA

26.1 SERVICE, POWER, SWITCHING, DISTRIBUTION 1 LS

26.2 NEW OCCUPANCY SENSOR 2 EA

26.3 NEW ILLUMINTED EXIST SIGNAGE 2 EA

26.4 REPLACE LIGHT FIXTURE: WITH NEW 4' LINEAR LED RECESS LIGHT FIXTURE 20 EA

26.5 REPLACE LIGHT FIXTURE: WITH NEW 6' ROUND LED RECESS LIGHT FIXTURE 3 EA

26.6 DATA AND COMMUNICATIONS CONDUITS ONLY 1 LS

26.7 MISCELLANEOUS IT CABLING AND OTHER RELATED WORK 1 EA 28 29
30 31
32 BID ITEM & DESCRIPTION

BID RANKING

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

1. BID TABULATION
PROJECT NAME: FELDHEYM CENTRAL LIBRARY MAKERSPACE ROOM REMODEL PROJECT NO:

BID TABULATION
Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price $ 30,348.50 $ 30,348.50 $ 8,250.00 $ 8,250.00 $ 11,934.00 $ 11,934.00 $ 68,170.25 $ 68,170.25 $ 37,863.00 $ 37,863.00 $ 75,000.00 $ 75,000.00 $ 30,348.50 $ 30,348.50 $ 33,000.00 $ 33,000.00 $ 42,005.00 $ 42,005.00 $ 8,115.00 $ 8,115.00 $ 105,550.00 $ 105,550.00 $ 35,000.00 $ 35,000.00 $ 7,000.00 $ 7,000.00 $ 4,950.00 $ 4,950.00 $ 2,349.00 $ 2,349.00 $ 1,750.00 $ 1,750.00 $ 1,000.00 $ 1,000.00 $ 9,000.00 $ 9,000.00 $ 3,600.00 $ 3,600.00 $ 1,650.00 $ 1,650.00 $ 1,020.00 $ 1,020.00 $ 1,100.00 $ 1,100.00 $ 475.00 $ 475.00 $ 1,500.00 $ 1,500.00 $ 10,000.00 $ 10,000.00 $ 4,950.00 $ 4,950.00 $ 11,590.00 $ 11,590.00 $ 8,175.00 $ 8,175.00 $ 11,000.00 $ 11,000.00 $ 9,500.00 $ 9,500.00 $ 10,000.00 $ 10,000.00 $ 7,700.00 $ 7,700.00 $ 18,843.00 $ 18,843.00 $ 16,175.00 $ 16,175.00 $ 11,000.00 $ 11,000.00 $ 10,500.00 $ 10,500.00 $ 4,000.00 $ 4,000.00 $ 1,900.00 $ 1,900.00 $ 997.00 $ 997.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 2,500.00 $ 2,500.00 $ 91.75 $ 1,835.00 $ 82.50 $ 1,650.00 $ 111.55 $ 2,231.00 $ 882.50 $ 17,650.00 $ 50.00 $ 1,000.00 $ 150.00 $ 3,000.00 $ 32.85 $ 20,399.85 $ 22.00 $ 13,662.00 $ 55.40 $ 34,403.40 $ 54.75 $ 33,999.75 $ 30.60 $ 19,002.60 $ 27.00 $ 16,767.00 $ 60.00 $ 60.00 $ 22,000.00 $ 22,000.00 $ 10,684.00 $ 10,684.00 $ 6,700.00 $ 6,700.00 $ 10,500.00 $ 10,500.00 $ 17,533.00 $ 17,533.00 $ 12.19 $ 19,991.60 $ 8.80 $ 13,662.00 $ 9.05 $ 14,842.00 $ 10.98 $ 18,007.20 $ 12.80 $ 20,992.00 $ 11.00 $ 18,040.00 $ 4,000.00 $ 4,000.00 $ 5,500.00 $ 5,500.00 $ 1,250.00 $ 1,250.00 $ 1,171.00 $ 1,171.00 $ 1,500.00 $ 1,500.00 $ 2,559.00 $ 2,559.00 $ 300.00 $ 300.00 $ 2,200.00 $ 2,200.00 $ 214.00 $ 214.00 $ 1,200.00 $ 1,200.00 $ 1,000.00 $ 1,000.00 $ 3,000.00 $ 3,000.00 $ 800.00 $ 1,600.00 $ 1,100.00 $ 2,200.00 $ 510.00 $ 1,020.00 $ 505.00 $ 1,010.00 $ 500.00 $ 1,000.00 $ 750.00 $ 1,500.00 $ 1,300.00 $ 1,300.00 $ 1,650.00 $ 1,650.00 $ 1,092.00 $ 1,092.00 $ 1,100.00 $ 1,100.00 $ 350.00 $ 350.00 $ 3,304.00 $ 3,304.00 $ 125.00 $ 125.00 $ 550.00 $ 550.00 $ 196.00 $ 196.00 $ 950.00 $ 950.00 $ 500.00 $ 500.00 $ 750.00 $ 750.00 $ 400.00 $ 400.00 $ 550.00 $ 550.00 $ 279.00 $ 279.00 $ 1,450.00 $ 1,450.00 $ 1,000.00 $ 1,000.00 $ 750.00 $ 750.00 $ 3,800.00 $ 3,800.00 $ 13,200.00 $ 13,200.00 $ 3,417.00 $ 3,417.00 $ 2,300.00 $ 2,300.00 $ 3,500.00 $ 3,500.00 $ 14,000.00 $ 14,000.00 $ 2,300.00 $ 2,300.00 $ 5,500.00 $ 5,500.00 $ 2,255.00 $ 2,255.00 $ 6,000.00 $ 6,000.00 $ 2,500.00 $ 2,500.00 $ 6,000.00 $ 6,000.00 $ 30,000.00 $ 30,000.00 $ 34,500.00 $ 34,500.00 $ 33,222.00 $ 33,222.00 $ 24,356.59 $ 24,356.59 $ 7,658.00 $ 7,658.00 $ 25,860.00 $ 25,860.00 $ 2,408.50 $ 4,817.00 $ 2,875.00 $ 5,750.00 $ 2,966.50 $ 5,933.00 $ 3,220.00 $ 6,440.00 $ 3,604.00 $ 7,208.00 $ 1,500.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 $ 30,475.00 $ 30,475.00 $ 31,113.00 $ 31,113.00 $ 28,720.00 $ 28,720.00 $ 54,800.00 $ 54,800.00 $ 41,500.00 $ 41,500.00 $ 150.00 $ 300.00 $ 632.50 $ 1,265.00 $ 613.00 $ 1,226.00 $ 1,766.50 $ 3,533.00 $ 250.00 $ 500.00 $ 1,000.00 $ 2,000.00 $ 150.00 $ 300.00 $ 1,035.00 $ 2,070.00 $ 1,012.00 $ 2,024.00 $ 2,103.00 $ 4,206.00 $ 350.00 $ 700.00 $ 1,250.00 $ 2,500.00 $ 2,100.00 $ 42,000.00 $ 1,035.00 $ 20,700.00 $ 1,044.35 $ 20,887.00 $ 1,005.10 $ 20,102.00 $ 400.00 $ 8,000.00 $ 427.00 $ 8,540.00 $ 800.00 $ 2,400.00 $ 862.50 $ 2,587.50 $ 876.00 $ 2,628.00 $ 1,571.67 $ 4,715.01 $ 500.00 $ 1,500.00 $ 500.00 $ 1,500.00 $ 10,000.00 $ 10,000.00 $ 6,900.00 $ 6,900.00 $ 6,789.00 $ 6,789.00 $ 8,226.00 $ 8,226.00 $ 3,000.00 $ 3,000.00 $ 1,000.00 $ 1,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 Apparent Low
Bidder 6
Apparent Low
Bidder 7
Apparent Low
Bidder 8
Apparent Low
Bidder 9
Apparent Low
Bidder 10
Apparent Low
Bidder 11
$266,225.45 $268,971.50 $284,443.40 $315,821.80 $333,598.60 $336,103.00 $267,534.00 $268,941.00 $284,436.00 $315,822.05 $331,000.00 $336,103.00 Apparent Low Bidder 6 Apparent Low Bidder 10
KNC CONSTRUCTION INC. STALLWORTH CONSTRUCTION
& MANAGEMENT CORP.

Apparent Low Bidder 7

YMC FIRST TRADE LLC NW BUILDING GROUP
Apparent Low Bidder 8 Apparent Low Bidder 11

PRIMA CAST CONSTRUCTION
LLC
Apparent Low Bidder 9
BCM GROUP INC.

S:\ENGINEERING\RFCA's\2026 All\06-03-2026\Feldheym Library Makerspace\BID TABULATION & REFERENCE CHECK.xlsxBID TABULATION 2 of 3 PktP1800
Quantity Unit
1 MOBILIZATION AND OTHER REQUIREMENTS 1 LS

2.1 BUILDING DEMO AND REMOVAL - INTERIOR WALL PARTITIONS, WINDOW PARTITIONS, DOORS,

CARPET TILE, BUILT-IN COUNTER, SHELVES, GYPSUM BOARD, WINDOW BLINDS, SIGNAGE, LIGHT

SWITCHES, OUTLETS, LIGHT FIXTURES, ACOUSTICAL CEILING TILES, SELECTIVE DEMOLITION 1 LS

5.1 METAL STUD FRAMING at INTERIOR 1 LS

7.1 PIPE INSULATION WRAP 1 EA

8.1 NEW FIRE RATED METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA

8.2 NEW FIRE RATED DOUBLE METAL DOOR AND METAL DOOR FRAME, WITH FINISH HARDWARE 1 EA

8.2 NEW DOOR THRESHOLD 1 EA

9.1 ACOUSTICALCEILING TILE PANELS 24 x 48 20 EA

9.2 ACOUSTICALWALL PANELS 621 SF

9.3 GYPSUM BOARD 1 LS

9.4 POLISH CONCRETE 1,640 SF

9.5 RUBBER BASE 1 LS

10.1 REINSTALLATION OF EXISITNG HALL SIGNAGE & PICTURES 1 LS

10.2 TACTILE EXIST SIGNAGE ON WALL 2 EA

10.3 ACCESS PANEL FOR PLUMBING VALVES 1 EA

10.4 SURFACE MOUNTED LIQUID SOAP DISPENSER 1 EA

10.5 PAPER TOWEL DISPENSER/WASTE RECETACLE - RECESS MOUNTED 1 EA

11.1 FAUCET 1 LS

15.1 SUPPLY,RETURN REGISTERS AND ANY DUCT EXTENTION NEEDED 1 LS

22.1 SUPPLY, SEWER, VENT PIPING 1 LS

22.2 SHUT OFF VALVES FOR COLD AND HOT WATER 2 EA

26.1 SERVICE, POWER, SWITCHING, DISTRIBUTION 1 LS

26.2 NEW OCCUPANCY SENSOR 2 EA

26.3 NEW ILLUMINTED EXIST SIGNAGE 2 EA

26.4 REPLACE LIGHT FIXTURE: WITH NEW 4' LINEAR LED RECESS LIGHT FIXTURE 20 EA

26.5 REPLACE LIGHT FIXTURE: WITH NEW 6' ROUND LED RECESS LIGHT FIXTURE 3 EA

26.6 DATA AND COMMUNICATIONS CONDUITS ONLY 1 LS

26.7 MISCELLANEOUS IT CABLING AND OTHER RELATED WORK 1 EA 28 29
30 31
32 BID ITEM & DESCRIPTION

BID RANKING

TOTAL BID AMOUNT CALCULATED BASED ON UNIT PRICES

TOTAL BID AMOUNT INDICATED BY BIDDER

CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED BID AMOUNT

1. BID TABULATION
PROJECT NAME: FELDHEYM CENTRAL LIBRARY MAKERSPACE ROOM REMODEL PROJECT NO:

BID TABULATION
Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price $ 65,906.50 $ 65,906.50 $ 51,037.00 $ 51,037.00 $ 20,000.00 $ 20,000.00 $ 136,950.00 $ 136,950.00 $ 116,267.00 $ 116,267.00 $37,200.00 $ 37,200.00 $ 32,200.00 $ 32,200.00 $ 18,305.00 $ 18,305.00 $ 50,000.00 $ 50,000.00 $ 40,000.00 $ 40,000.00 $ 47,782.00 $ 47,782.00 $20,427.00 $ 20,427.00 $ 3,450.00 $ 3,450.00 $ 4,586.00 $ 4,586.00 $ 36,093.00 $ 36,093.00 $ 7,000.00 $ 7,000.00 $ 10,000.00 $ 10,000.00 $ 1,391.00 $ 1,391.00 $ 1,150.00 $ 1,150.00 $ 360.00 $ 360.00 $ 3,000.00 $ 3,000.00 $ 100.00 $ 100.00 $ 21,000.00 $ 21,000.00 $ 1,790.00 $ 1,790.00 $ 8,050.00 $ 8,050.00 $ 4,586.00 $ 4,586.00 $ 8,000.00 $ 8,000.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 $42,800.00 $ 42,800.00 $ 17,537.50 $ 17,537.50 $ 6,563.00 $ 6,563.00 $ 12,000.00 $ 12,000.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 $66,400.00 $ 66,400.00 $ 287.50 $ 287.50 $ 975.00 $ 975.00 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 1,200.00 $ 1,200.00 $ 74.75 $ 1,495.00 $ 950.00 $ 19,000.00 $ 4,000.00 $ 4,000.00 $ 100.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 111.00 $ 2,220.00 $ 21.85 $ 13,568.85 $ 45.00 $ 27,945.00 $ 21,735.00 $ 21,735.00 $ 30.00 $ 18,000.00 $ 15,000.00 $ 15,000.00 $ 40.00 $ 24,840.00 $ 25,875.00 $ 25,875.00 $ 62,965.00 $ 62,965.00 $ 18,000.00 $ 18,000.00 $ 7,000.00 $ 7,000.00 $ 20,000.00 $ 20,000.00 $23,470.00 $ 23,470.00 $ 8.74 $ 14,333.60 $ 12.00 $ 19,680.00 $ 19,680.00 $ 19,680.00 $ 8.00 $ 13,000.00 $ 12,465.00 $ 12,465.00 $ 13.25 $ 21,730.00 $ 1,840.00 $ 1,840.00 $ 3,183.00 $ 3,183.00 $ 4,000.00 $ 4,000.00 $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 627.00 $ 627.00 $ 575.00 $ 575.00 $ 5,060.00 $ 5,060.00 $ 2,500.00 $ 2,500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 1,200.00 $ 1,200.00 $ 172.50 $ 345.00 $ 350.00 $ 700.00 $ 1,200.00 $ 1,200.00 $ 500.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 600.00 $ 1,200.00 $ 575.00 $ 575.00 $ 450.00 $ 450.00 $ 800.00 $ 800.00 $ 500.00 $ 500.00 $ 510.00 $ 510.00 $ 1,200.00 $ 1,200.00 $ 345.00 $ 345.00 $ 250.00 $ 250.00 $ 600.00 $ 600.00 $ 150.00 $ 150.00 $ 700.00 $ 700.00 $ 600.00 $ 600.00 $ 920.00 $ 920.00 $ 300.00 $ 300.00 $ 1,200.00 $ 1,200.00 $ 800.00 $ 800.00 $ 700.00 $ 700.00 $ 1,800.00 $ 1,800.00 $ 2,800.00 $ 2,800.00 $ 10,000.00 $ 10,000.00 $ 35,000.00 $ 35,000.00 $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 $10,620.00 $ 10,620.00 $ 6,325.00 $ 6,325.00 $ 5,830.00 $ 5,830.00 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 $ 8,000.00 $ 8,000.00 $15,900.00 $ 15,900.00 $ 19,550.00 $ 19,550.00 $ 9,550.00 $ 9,550.00 $ 18,000.00 $ 18,000.00 $ 20,000.00 $ 20,000.00 $ 11,860.00 $ 11,860.00 $29,760.00 $ 29,760.00 $ 2,300.00 $ 4,600.00 $ 3,850.00 $ 7,700.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 2,000.00 $ 11,860.00 $ 11,860.00 $ 600.00 $ 1,200.00 $ 46,000.00 $ 46,000.00 $ 12,380.00 $ 12,380.00 $ 50,000.00 $ 50,000.00 $ - $ - $ 26,220.00 $ 26,220.00 $25,097.00 $ 25,097.00 $ 3,147.55 $ 6,295.10 $ 1,850.00 $ 3,700.00 $ 1,200.00 $ 1,200.00 $ - $ - $ 1,706.00 $ 1,706.00 $ 3,000.00 $ 6,000.00 $ 1,587.00 $ 3,174.00 $ 780.00 $ 1,560.00 $ 7,000.00 $ 7,000.00 $ - $ - $ 1,033.00 $ 1,033.00 $ 3,000.00 $ 6,000.00 $ 1,587.00 $ 31,740.00 $ 2,400.00 $ 48,000.00 $ 12,000.00 $ 12,000.00 $ - $ - $ 17,602.00 $ 17,602.00 $ 1,920.00 $ 38,400.00 $ 1,587.00 $ 4,761.00 $ 1,500.00 $ 4,500.00 $ 900.00 $ 2,700.00 $ 70,000.00 $ 70,000.00 $ 2,215.00 $ 2,215.00 $ 2,000.00 $ 6,000.00 $ 4,600.00 $ 4,600.00 $ 10,885.00 $ 10,885.00 $ 6,000.00 $ 6,000.00 $ - $ - $ 5,721.00 $ 5,721.00 $ 1,220.00 $ 1,220.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $20,000.00 $ 20,000.00 Apparent Low
Bidder 12
Apparent Low
Bidder 13
Apparent Low
Bidder 14
Apparent Low
Bidder 15
Apparent Low
Bidder 16
Apparent Low
Bidder 17
$338,299.05 $360,050.00 $369,208.00 $384,000.00 $402,141.00 $410,292.00 $338,299.05 $360,050.00 $369,208.00 $383,131.00 $402,141.00 $410,292.00 Apparent Low Bidder 13

MBE CONSTRUCTION
Apparent Low Bidder 16

CO BROTHERS EDRA CONSTRUCTION
CORP.

Apparent Low Bidder 17

BLACKSTONE BUILDERS
INC.

Apparent Low Bidder 12
MONET CONSTRUCTION INC.

Apparent Low Bidder 14 Apparent Low Bidder 15
JM BUILDERS INC.

S:\ENGINEERING\RFCA's\2026 All\06-03-2026\Feldheym Library Makerspace\BID TABULATION & REFERENCE CHECK.xlsxBID TABULATION 3 of 3 PktP1801
Packet Page. 1802
Packet Page. 1803
Packet Page. 1804
Packet Page. 1805
Packet Page. 1806
Packet Page. 1807
Packet Page. 1808
Packet Page. 1809
Packet Page. 1810
Packet Page. 1811
Packet Page. 1812
Packet Page. 1813
Packet Page. 1814
Packet Page. 1815
Packet Page. 1816
Packet Page. 1817
Packet Page. 1818
Packet Page. 1819
Packet Page. 1820
Packet Page. 1821
Packet Page. 1822
Packet Page. 1823
Packet Page. 1824
Packet Page. 1825
Packet Page. 1826
Packet Page. 1827
Packet Page. 1828
Packet Page. 1829
Packet Page. 1830
Packet Page. 1831
Attachment 4
Location Map
500 ft
N
➤
Packet Page. 1832

CONSENT CALENDAR
City of San Bernardino
Request for Council Action
Date: June 3, 2026
To: Honorable Mayor and City Council Members
From: Lynn Merrill, Director of Public Works
Department: Public Works
Subject: Award of Cooperative Goods Purchasing Agreement with Public Restroom Company for the La Plaza Park
Improvement Project in the amount of $327,742. (Ward 1) Recommendation:

It is recommended that the Mayor and City Council of the City of San Bernardino, California:

1. Approve the award of a Cooperative Goods Purchasing Agreement with Public Restroom Company for the Lytle Creek park and Community Center Renovations Project (Project) in the amount of $327,742; and

2. Authorize the City Manager or designee to execute all documents with Public Restroom Company.

City Manager's Comments
The City Manager recommends approval of the award of $327,742 for the installation of prefabricated restroom building at La Plaza Park.

Executive Summary
Awarding the cooperative goods purchasing agreement with Public Restroom Company will allow the City to move forward with the fabrication and installation of a prefabricated restroom building at La Plaza Park. Upon award, Public Restroom Company will fully assemble the restroom building off-site and provide a turnkey installation service once on-site preparations have been completed. This award utilizes a competitively solicited Sourcewell agreement and will be funded by the previously approved County and City funds.

Packet Page. 1833
Background
On May 7, 2025, the Mayor and City Council approved a funding agreement with the Couty of San Bernardino for the La Plaza Park Improvements Project. The agreement provided $1,342,243 of County funds and approved matching City funds in the amount of $447,414 for a total project budget of $1,789,657.

On September 3, 2025, the Mayor and City Council approved a Task order with Rick Engineering Company for designs services for the Project in the amount of $304,720.

Improvements proposed to be in the design included, but are not limited to gazebo, restroom building, walkways, lighting, turf, ADA accessibility, playground equipment, electrical components, monument sign, and statue
As part of the Task Order awarded to Rick Engineering Company, a prefabricated restroom design was prepared to replace the existing restroom building at La Plaza Park. To deliver this proposed improvement, Rick Engineering Company contacted Public Restroom Company (PRC) and requested a design, which was refined based on input from City staff. PRC has fabricated and installed restrooms for other City park projects, including Nicholson Park and Seccombe Lake Park. They are also in the process of fabricating a new restroom building for Lytle Creek Park.

Discussion
Awarding the Cooperate Goods Purchasing Agreement will provide a prefabricated restroom building for the La Plaza Park project. The building will include two accessible all gender single occupant restroom stalls, two drinking fountains, and a utility chase.

The agreement includes the fabrication, delivery, and installation of the building by Public Restroom Company. The building includes a 5-year warranty for defects in material or workmanship, and a 20-year structural warranty for components including the exterior walls, slab/foundation, and roof system.

This award utilizes a competitively solicited Sourcewell agreement (Master Agreement #052725), which was procured using a publicly issued solicitation (RFP #052725 – Restroom and Shower Facilities). Sourcewell is a local government and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123.A.21) offering a Cooperative Purchasing Program to eligible participating government entities. Public Contract Code Section 10298(a) and Article V, Section 5.5 of the City’s Purchasing Policy authorize the City to utilize cooperative purchasing agreements with other public agencies when determined to be in the City’s best interest." Once the agreement is awarded and fully executed, the fabrication of the building is estimated to take approximately 9 months to complete.

Prior to installation of the building, on-site preparation will be constructed by a thirdparty general contractor. Once the building is installed, the general contractor will be responsible for the final utility connections. These services will be awarded later and will be based on the overall park design prepared by Rick Engineering Company.

Permits for the building will also be acquired as necessary.

Packet Page. 1834
The PRC proposal cost is as follows:

Assemble and Deliver Prefabricated Restroom Building $301,937 Turnkey Installation Service $25,805
Total Cost $327,742
Funding will be provided by the previously approved City and County funding in the amount of $1,789,657.

The proposed budget utilization would be as follows:

Project Funding $1,789,657
Rick Engineering Company Award ($304,720)
Estimated Year-to-Date Administrative Costs ($1,825)
Public Restroom Company Award ($327,742)
Remaining Budget $1,155,370
2021-2025 Strategic Targets and Goals
This project is consistent with Key Target No. 2: Focused, Aligned Leadership and Unified Community through the opportunity to improve city parks, increase community engagement and involvement in city-run recreation activities, and Key Target No. 3:

Improved Quality of Life through encouraging active lifestyles and crime reduction through built environment and increased community visibility.

Fiscal Impact
There is no fiscal impact on the general fund. Funding for this $327,742 agreement will be provided from the previously approved County and City funding in the amount of $1,789,657.

Conclusion
It is recommended that the Mayor and City Council of the City of San Bernardino, California;

1. Approve the award of a Cooperative Goods Purchasing Agreement with Public Restroom Company for the Lytle Creek park and Community Center Renovations Project (Project) in the amount of $327,742; and

2. Authorize the City Manager or designee to execute all documents with Public Restroom Company.

Attachments
Attachment 1 Cooperative Goods Purchasing Agreement with Public Restroom Company
Packet Page. 1835
Attachment 2 Sourcewell Master Agreement #052725
Attachment 3 Project Location Map
Ward:

First Ward
Synopsis of Previous Council Actions:

May 7, 2025 Approval of Funding Agreement with the County of San Bernardino for La Plaza Park Improvements.

September 3, 2025 Approval of a Task Order with Rick Engineering Company for La Plaza park Improvement in the amount of $304,720 for total design cost and contingencies.

CC
Eric Levitt, City Manager
Packet Page. 1836
1 GOODS PURCHASE AGREEMENT

BETWEEN

THE CITY OF SAN BERNARDINO
AND

PUBLIC RESTROOM COMPANY
This Goods Purchase Agreement (“Agreement”) is entered into this 3rd day of June, 2026, by and between the City of San Bernardino, a charter city and municipal corporation organized under the laws of the State of California with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, County of San Bernardino, State of California (“City”), and Public Restroom Company, a Nevada corporation with its principal place of business at 2587 Business Parkway, Minden, NV 89423 (“Supplier”). The City and Supplier may be referred to individually as a “Party” and collectively as the “Parties” in this Agreement.

RECITALS
A. The City has a need to procure one (1) prefabricated public restroom building for La Plaza Park (“Goods”).

B. Sourcewell issued a public solicitation identified as RFP #052725 – Restroom and Shower Facilities Solutions, through which Public Restroom Company was awarded a cooperative contract (the “Master Agreement”).

C. Public Contract Code Section 10298(a) and Article V, Section 5.5 of the City’s Purchasing Policy authorize the City to utilize cooperative purchasing agreements with other public agencies when determined to be in the City’s best interest.

D. The City desires to procure the Goods under Sourcewell Contract No. 052725-PRM, as permitted under the Master Agreement, subject to the City’s terms and conditions herein.

AGREEMENT
Section 1. DEFINITIONS.

A. “Goods” means the prefabricated restroom building and associated factoryprovided components as described in Exhibit A. Goods do not include site preparation, foundations, underground utilities, installation, testing, or commissioning unless expressly stated in writing in Exhibit A.

B. “Delivery Date(s)” means that date or dates upon which the Goods is to be delivered to City, ready for approval, testing and/or use as specified in Exhibit “B.” Section 2. MATERIALS AND WORKMANSHIP.

When Exhibit “A” specifies machinery, equipment or material by manufacturer, Packet Page. 1837
2 model or trade name, no substitution will be made without City’s written approval.

Machinery, equipment or material installed in the Goods without the approval required by this Section 2 will be deemed to be defective material for purposes of Section 4. Where machinery, equipment or materials are referred to in Exhibit “A” as equal to any particular standard, City will decide the question of equality. When requested by City, Supplier will furnish City with the name of the manufacturer, the performance capabilities and other pertinent information necessary to properly determine the quality and suitability of any machines, equipment and material to be incorporated in the Goods. Material samples will be submitted at City’s request.

Section 3. INSPECTIONS AND TESTS.

City shall have the right to inspect and/or test the Goods prior to acceptance. If upon inspection or testing the Goods or any portion thereof are found to be nonconforming, unsatisfactory, defective, of inferior quality or workmanship, or fail to meet any requirements or specifications contained in Exhibit “A,” then without prejudice to any other rights or remedies, City may reject the Goods or exercise any of its rights under Section 4.C. The inspection, failure to make inspection, acceptance of goods, or payment for goods shall not impair City’s right to reject nonconforming goods, irrespective of City’s failure to notify Supplier of a rejection of nonconforming goods or revocation of acceptance thereof or to specify with particularity any defect in nonconforming goods after rejection or acceptance thereof.

Section 4. WARRANTY.

A. Supplier’s warranty applies solely to defects in materials and workmanship of the factory-built Goods. This warranty does not apply to site-constructed work, foundations, utilities, connections, misuse, vandalism, or normal wear and tear for a period of two (2) years, or such longer period as provided by a manufacturer’s warranty or as agreed to by Supplier and City, from the date of final written acceptance of the Goods by City as required for final payment under Section 7. Supplier further warrants that any services provided in connection with the Goods will be performed in a professional and workmanlike manner and in accordance with the highest industry standards.

B. Supplier further warrants that all machinery, equipment, or process included in the Goods will meet the performance requirements and specifications specified in Exhibit “A” and shall be fit for the purpose intended. City’s inspection, testing, approval, or acceptance of any such machinery, equipment, or process will not relieve Supplier of its obligations under this Section 4.B.

C. For any breach of the warranties contained in Section 4.A and Section 4.B, Supplier will, immediately after receiving notice from City, at the option of City, and at Supplier’s own expense and without cost to City:

1. Repair the defective Goods;
Packet Page. 1838
3 2. Replace the defective Goods with conforming Goods, F.O.B. City’s plant, office or other location of City where the Goods was originally performed or delivered; or

3. Repay to City the purchase price of the defective Goods.

If City selects repair or replacement, any defects will be remedied without cost to City, including but not limited to, the costs of removal, repair, and replacement of the defective Goods, and reinstallation of new Goods. All such defective Goods that are so remedied will be similarly warranted as stated above. In addition, Supplier will repair or replace other items of the Goods which may have been damaged by such defects or the repairing of the same, all at its own expense and without cost to City.

D. Supplier also warrants that the Goods are free and clear of all liens and encumbrances whatsoever, that Supplier has a good and marketable title to same, and that Supplier owns or has a valid license for all of the proprietary technology and intellectual property incorporated within the Goods. Supplier agrees to indemnify, defend, and hold City harmless against any and all third party claims resulting from the breach or inaccuracy of any of the foregoing warranties.

E. In the event of a breach by Supplier of its obligations under this Section 4, City will not be limited to the remedies set forth in this Section 4, but will have all the rights and remedies permitted by applicable law, including without limitation, all of the rights and remedies afforded to City under the California Commercial Code.

Section 5. PRICES.

Unless expressly provided otherwise, all prices and fees specified in Exhibit “C,” attached hereto and incorporated herein by reference, are firm and shall not be subject to change without the written approval of City. No extra charges of any kind will be allowed unless specifically agreed to in writing by City’s authorized representative. The total price shall include (i) all federal, state and local sales, use, excise, privilege, payroll, occupational and other taxes applicable to the Goods furnished to City hereunder; and (ii) all charges for packing, freight and transportation to destination.

Section 6. CHANGES.

City, at any time, by a written order, and without notice to any surety, may make changes in the Goods, including but not limited to, City’s requirements and specifications.

If such changes affect the cost of the Goods or time required for its performance, an equitable adjustment will be made in the price or time for performance or both. Any change in the price necessitated by such change will be agreed upon between City and Supplier and such change will be authorized by a change order document signed by City and accepted by Supplier.

Packet Page. 1839
4 Section 7. PAYMENTS.

A. Terms of payment, are net thirty (30) days, less any applicable retention, after receipt of invoice, or completion of applicable Progress Milestones. Final payment shall be made by City after Supplier has satisfied all contractual requirements. Payment of invoices shall not constitute acceptance of Goods.

B. If Progress Milestones have been specified in Exhibit “B,” then payments for the Goods will be made as the requirements of such Progress Milestones are met.

Progress payments for the Goods will be made by City upon proper application by Supplier during the progress of the Goods and according to the terms of payment as specified in Exhibit “B.” Supplier’s progress billing invoice will include progress payments due for the original scope of work and changes. Each “Item for Payment” shown in Exhibit “B” and each change order will be itemized on the invoice. Invoices for cost plus work, whether part of Exhibit “B” or a change order, must have subcontractor and/or supplier invoices attached to Supplier’s invoice. Other format and support documents for invoices will be determined by City in advance of the first invoice cycle.

C. Payments otherwise due may be withheld by City on account of defective Goods not remedied, liens or other claims filed, reasonable evidence indicating probable filing of liens or other claims, failure of Supplier to make payments properly to its subcontractors or for material or labor, the failure of Supplier to perform any of its other obligations under the Agreement, or to protect City against any liability arising out of Supplier’s failure to pay or discharge taxes or other obligations. If the causes for which payment is withheld are removed, the withheld payments will be made promptly. If the said causes are not removed within a reasonable period after written notice, City may remove them at Supplier’s expense.

D. Payment of the final Progress Milestone payment or any retention will be made by City upon:

1. Submission of an invoice for satisfactory completion of the requirements of a Progress Milestone as defined in Exhibit “B” and in the amount associated with the Progress Milestone;

2. Written acceptance of the Goods by City;

3. Delivery of all drawings and specifications, if required by City;

4. Delivery of executed full releases of any and all liens arising out of this Agreement; and

5. Delivery of an affidavit listing all persons who might otherwise be entitled to file, claim, or maintain a lien of any kind or character, and containing an averment that all of the said persons have been paid in full.

If any person refuses to furnish an actual release or receipt in full, Supplier may Packet Page. 1840
5 furnish a bond satisfactory to City to indemnify City against any claim or lien at no cost to City.

E. Acceptance by Supplier of payment of the final Progress Milestone payment pursuant to Section 7.D will constitute a waiver, release and discharge of any and all claims and demands of any kind or character which Supplier then has, or can subsequently acquire against City, its successors and assigns, for or on account of any matter or thing arising out of, or in any manner connected with, the performance of this Agreement. However, payment for the final Progress Milestone by City will not constitute a waiver, release or discharge of any claims or demands which City then has, or can subsequently acquire, against Supplier, its successors and assigns, for or on account of any matter or thing arising out of, or in any manner connected with, the performance of this Agreement.

Section 8. SCHEDULE FOR DELIVERY.

A. The time of Supplier’s performance is of the essence for this Agreement.

The Goods will be delivered in accordance with the schedule set forth in Exhibit “B.” Supplier must immediately notify City in writing any time delivery is behind schedule or may not be completed on schedule.

B. In the event that the Goods are part of a larger project or projects that require the coordination of multiple contractors or suppliers, then Supplier will fully cooperate in scheduling the delivery so that City can maximize the efficient completion of such project(s).

Section 9. TAXES.

A. Supplier agrees to timely pay all sales and use tax (including any value added or gross receipts tax imposed similar to a sales and use tax) imposed by any federal, state or local taxing authority on the ultimate purchase price of the Goods provided under this Agreement.

B. Supplier will withhold, and require its subcontractors, where applicable, to withhold all required taxes and contributions of any federal, state or local taxing authority which is measured by wages, salaries or other remuneration of its employees or the employees of its subcontractors. Supplier will deposit, or cause to be deposited, in a timely manner with the appropriate taxing authorities all amounts required to be withheld.

C. All other taxes, however denominated or measured, imposed upon the price of the Goods provided hereunder, will be the responsibility of Supplier. In addition, all taxes assessed by any taxing jurisdiction based on Supplier property used or consumed in the provision of the Goods, such as and including ad valorem, use, personal property and inventory taxes, will be the responsibility of Supplier.

D. Supplier will, upon written request, submit to City written evidence of any filings or payments of all taxes required to be paid by Supplier hereunder.

← All documents from this meeting