Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-1 October 2025

MITIGATION MONITORING AND REPORTING PROGRAM
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
Air Quality and Greenhouse Gas Emissions
MM AIR-1a: Prior to construction of the proposed improvements, the project
proponent will provide a Fugitive Dust Control Plan (FDCP) that will describe the application of standard best management practices to control dust during construction. Best management practices will include:
•Application of water on disturbed soils a minimum of two times per day.
•Using track-out prevention devices at construction site access points.
•Stabilizing construction area exit points.
•Limiting onsite construction traffic to 15 miles per hour on unpaved roads.
•Limiting onsite construction traffic to 25 miles per hour on paved roads.
•Paving or providing a hard surface for onsite roads to reduce fugitive dust.
•Covering dirt haul vehicles; and
•Replanting disturbed areas as soon as practical and other measures, as deemed appropriate to the site, to control fugitive dust.

The Fugitive Dust Control Plan shall be submitted to the City for review and approval prior to grading.

Prior to
Construction and
Grading Activities
Provide a Fugitive Dust
Control Plan
City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-1b: Prior to construction of the proposed improvements, a Construction Traffic Control Plan (CTCP) will be reviewed and approved by the City. CTCP will describe in detail safe detours around the project construction site and provide temporary traffic control (i.e., flag person) during construction-related truck hauling activities.

Prior to
Construction
Activities
Provide Construction
Traffic Control Plan
(CTCP)
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-2 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
MM AIR-1c: During construction of the proposed improvements, construction equipment shall be properly maintained at an offsite location, including proper tuning and timing of engines. Equipment maintenance records and equipment design specification data sheets shall be kept on-site during construction.

During
Construction and
Grading Activities
Construction
Equipment to occur at
an offsite location.

City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-1d: During construction of the proposed improvements, all contractors will be advised not to idle construction equipment on the site for more than five minutes.

During
Construction and
Grading Activities
Construction
equipment to not idle
for longer than five
minutes.

City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-1e: During construction of the proposed improvements, onsite electrical hook ups shall be provided for electric construction tools including saws, drills and compressors, to eliminate the need for diesel powered electric generators.

During
Construction
Activities
Provide Electrical Hook
ups
City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-1f: Onsite grading equipment will comply with one or more of the following:
•Use of onsite grading and construction equipment equipped with oxidized diesel catalyst and fueled with aqueous diesel fuel during grading and construction operations with a reduced equipment fleet or hours of operation totaling a maximum of 17,000 horsepower hours per day.
•Use of onsite grading and construction equipment equipped with oxidized diesel catalyst with a reduced equipment fleet or hours of operation totaling a maximum of 14,000 horsepower hours per day.
•Use of onsite grading and construction equipment fueled with aqueous diesel fuel during grading and construction operations During Grading
Activities
Onsite Grading
Equipment to Comply
with Grading
Equipment standards
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-3 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
with a reduced equipment fleet or hours of operation totaling a maximum of 13,000 horsepower hours per day; and
•Reduce the grading and construction equipment fleet or hours of operation to a maximum total of 10,000 horsepower hours per day.

MM AIR-1g: Implementation of the Short-Term Air Quality Mitigation Measures shall be documented in an Air Quality Mitigation Implementation Plan. This plan will detail each mitigation measure and include daily logs documenting implementation of each mitigation measure. Daily logs for each piece of construction equipment will include the hours per day the equipment ran. A master daily log will document the hours of operation all equipment ran each day. The master daily log will also document timing and tuning of equipment, the type of fuel used on construction equipment, and any add-on emissions reduction equipment used such as oxidized diesel catalysts.

During
Construction
Activities
Document the Hours of
Operation of All
Equipment Ran Each
Day
City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-3a: The project proponent shall install bicycle racks at the clubhouse, MDA and A (attached) housing areas (Planning Areas 6, 8-11, 13, 14, 16, 18, and 20), and all park sites to encourage non- vehicular trips within the project.

During
Construction
Activities
Install Bicycle Racks at
Housing Areas and Park
City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-3b: The project design shall include signs posted in visible places in any truck parking areas that state, “No Idling.” During
Construction and
Operational
Activities
Install Signs On Visible
Places in Any Truck
Parking Areas that
State, “No Idling.”
City of San
Bernardino
Community
Development &
Housing
Department
MM AIR-9a: Areas and/or facilities to encourage recycling shall be provided and installed in all MDA and A (attached) residential areas consistent with City requirements.

During Operational
Activities
Encourage Recycling City of San
Bernardino
Community
Development &
------------------------------------------ ---------------------------------------- —
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-4 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
Housing
Department
MM AIR-9b: To increase energy efficiency, the following measures shall be implemented to the satisfaction of the City of San Bernardino: a) there shall be a minimum 10 percent reduction in all buildings, combined space heating, cooling, and water heating energy compared to the current Title 24 Standards; b) the project shall incorporate light roof colors and cool pavements in the residential driveway areas; c) each appliance (i.e., washer/dryers, refrigerators, stoves, etc.) provided by the builder must be Energy Star qualified if an Energy Star designation is applicable for that appliance; d) low-flow appliances (i.e., toilets, dishwashers, shower heads, washing machines) shall be installed and; e) solar powered water heaters and photovoltaic cells (solar panels) shall be offered to homebuyers as an option constructed in accordance with Title 24 performance standards.

During Operational
Activities
Encourage Energy
Saving
City of San
Bernardino
Community
Development &
Housing
Department
Biological Resources
MM BIO-1a: Plummer’s Mariposa Lily. During the spring prior to grading, the developer shall retain a qualified biologist to conduct a focused survey of the proposed development areas to determine if this species is present onsite. The survey shall be conducted according to the standard protocol established by CDFGCDFW. If the species is present, the developer shall fund relocation of the plants to a suitable location within the permanent open space area.

Prior to Project-
Related
Disturbance of
Soils (14 days)
Prior to Grading
Activities, Prepare a
Focused Survey
Qualified
Biologist
MM BIO-1b: Burrowing Owl. Within 30 days of grading or any ground disturbance activities on the project site, a qualified biologist shall conduct a focused survey to determine if Burrowing owls are present onsite. The survey shall be conducted according to the Standard protocol established by CDFGCDFW. If burrowing owls are determined to be present on the site, mitigation shall follow the CDFGCDFW guidelines including passive relocation. the developer shall coordinate with the City and CDFW to develop a Burrowing Owl Plan, as described below, to be approved by the City and CDFW prior to commencing project activities. Additionally, the developer may be Prior to Project-
Related
Disturbance of
Soils (within 30
days of grading)
Prior to Grading
Activities, Conduct a
Focused Survey
Qualified
Biologist
• ■—
--
--
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-5 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
required to obtain a Section 2081 incidental Take Permit, if impacts to Burrowing Owl cannot be avoided. The developer shall implement the 2081 Incidental Take Permit if required. If applicable, the Burrowing Owl Plan shall describe proposed avoidance, relocation, monitoring, minimization, and/or mitigation actions. The Burrowing Owl Plan shall include the number and location of occupied burrow sites and details on proposed buffers if avoiding the burrowing owls or information on the adjacent or nearby suitable habitat available nearby for relocation, details regarding the creation and funding of artificial burrows (numbers, location, and type of burrows) and management activities for relocated owls shall also be included in the Burrowing Owl Plan. The City shall implement the Burrowing Owl Plan following CDFW review and approval. If vegetation removal or ground disturbance begins within 30 days of the focused survey, no pre-construction survey would be required. If vegetation removal or ground disturbance activities begin after 30 days of the focused survey, a subsequent pre-construction survey would be required.

MM BIO-1c: Nesting Birds. If trees or large shrubs (over 4 feet in height) will be removed during the nesting season (February 1 through August 31), a qualified biologist shall conduct a nesting bird survey no more than 30 days prior to any disturbance to identify any potential nesting activity. If passerine birds are found to be nesting, or there is evidence of nesting behavior within 250 feet of the impact area, the biologist shall determine an appropriate buffer that shall be required around the nests. No vegetation removal or ground disturbance would occur within this buffer. For raptor species – birds of prey (e.g., hawks and owls) – this buffer would generally be 500 feet. A qualified biologist shall monitor the nests closely until it is determined that the nests are no longer active, at which time construction activities may commence within the buffer area.

Construction activity may encroach into the buffer area at the discretion of the biological monitor.

Prior to Project-
Related
Disturbance of
Soils
Nesting Bird Survey Qualified
Biologist

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-6 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
MM BIO-3a: Jurisdictional Land. Prior to grading, the developer shall obtain a Clean Water Act Section 404 Permit from USACE, a Clean Water Act Section 401 Certification from the RWQCB (Santa Ana Region), and a Streambed Alteration Agreement from CDFG CDFW if jurisdictional land will be impacted. Offsite mitigation, if necessary, shall be provided at a minimum 1:1 ratio depending on location and importance of the jurisdictional land removed. If the project provides onsite mitigation equal or in excess of its identified impact (i.e., removal of jurisdictional land), no permits maybe necessary. If there are impacts there will be a permit needed regardless of mitigation type, this determination shall be made by qualified biologists in consultation with City Planning, USACE, RWQCB, and CDFG CDFW staff based on the final land plan and value assigned to the proposed bio-swales and other drainage improvements onsite.

To further protect and offset removal of suitable habitat through the preservation of open space and preserve water quality through the implementation of standard Best Management Practices (BMPs):
•Clearly delineating the limits of disturbance.
•Avoiding impacts in preserved open space area.
•Preserving of open space through a deed restriction.

Using properly maintained equipment and storing equipment outside of jurisdictional waters.
•Properly implementing and monitoring water quality BMPs. •Avoiding use of chemicals near sensitive areas.
•Minimizing impacts to sensitive biological resources onsite including sensitive plant communities, jurisdictional waters, and sensitive wildlife species through the use of a biological monitor during vegetation removal.
•Implementing a worker education program through a pre- construction meeting with a biologist, which will include developing procedures for minimizing the likelihood of spills, ensuring worker safety, education regarding nesting birds and sensitive species, surveying for sensitive species prior to construction, and obtaining any necessary permits prior to Prior to Grading
Activities
Obtain Section 404
Permit, Section 401
Certification, and
Streambed Alteration
Agreement
Qualified
Biologist and
City of San
Bernardino
Community
Development &
Housing
Department
—
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-7 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
initiation of construction, including those listed in this mitigation, State ESA permits, and/or Federal ESA permits. •Crotch’s bumble bee (Bombus crotchii) is listed as a candidate species under the California Endangered Species Act. According to CDFW, the Project site is within the geographic range for Crotch’s bumble bee. Additionally, the Streambed Alteration Agreement would require avoidance, minimization and/or
mitigation measures to protect fish and wildlife and their habitat. Therefore, to minimize impacts to Crotch’s bumble bee from the Project, a qualified biologist shall conduct focused surveys within one year prior to vegetation removal and/or grading for the presence/absence of Crotch’s bumble bee.

Surveys shall be conducted during flying season when species is most likely to be detected above ground, between March 1 to September 1, by an approved qualified biologist, familiar with Crotch’s bumble bee behavior and live history. Surveys shall be conducted within the Project site and areas adjacent to the Project site where suitable habitat exists. Survey results including negative findings shall be submitted to CDFW 30 days prior to Project-related vegetation removal and/or ground- disturbing activities. If the species is identified onsite, and if “take” would occur, the developer shall apply for an incidental take permit and obtain “take” coverage prior to the initiation of Project activities.

Cultural Resources
MM CUL-2: The developer shall retain a qualified archaeologist with at least 3 years of regional experience in archaeology to monitor all ground-disturbing activities that occur within the proposed project area (which includes, but is not limited to, tree/shrub removal and planting, clearing/grubbing, grading, excavation, trenching, compaction, fence/gate removal and installation, drainage and irrigation removal and installation, hardscape installation [benches, signage, boulders, walls, seat walls, fountains, etc.], and archaeological work), grading to the satisfaction of the staff of the County Museum, and City Development & Housing Department, and Prior to Ground
Disturbing
Activities
Direct Observations,
Site Inspections
Qualified
Archaeologist
—
------- —
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-8 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
the consulting tribes, including Yuhaaviatam of San Manuel Nation Cultural Resources Management Department (YSMN, also known as San Manuel Band of Mission Indians). A sufficient number of archaeological monitors shall be present each workday to ensure that simultaneously occurring ground disturbing activities receive thorough levels of monitoring coverage.

MM CUL-3: If potentially significant archaeological or historic resources are encountered during subsurface activities, all construction within a 60 100-foot radius of the find shall cease until the monitor determines whether the resource requires further study. The developer shall include a standard inadvertent discovery clause in every construction contract to inform contractors of this requirement. Any previously undiscovered resources found during construction shall be recorded on appropriate DPR forms and evaluated for significance in terms of CEQA criteria by a qualified Secretary of the Interior (SOI) Archaeologist. Potentially significant cultural resources consist of, but are not limited to, glass, ceramics, stone, bone, wood, rock and shell artifacts or features, including hearths, structural remains, or pre-historic dumpsites. If the resource is determined to be significant under CEQA, a qualified SOI Archaeologist shall prepare and implement a research design and archaeological data recovery plan, if necessary. The archaeologist shall also perform appropriate technical analyses, prepare a full written report and file it with the appropriate information center, and provide for permanent curation of the recovered resources.

During Ground
Disturbing
Activities
Site Monitoring Qualified SOI
Archaeologist
MM CUL-4: Prior to the start of excavation, a qualified paleontological monitor will be retained to conduct an onsite monitoring program to ensure protection of previously unknown paleontological specimens. In the event a fossil is discovered during construction of the Project when the paleontological monitor is not present, excavation within 100 feet of the find shall be temporarily halted until the discovery is examined by a qualified paleontologist, in accordance with Society of Vertebrate Paleontology standards.

The developer shall include a standard inadvertent discovery clause in every construction contract to inform contractors of this Prior to
Grading/Excavation
Activities
Site Monitoring Qualified
Paleontological
Monitor
—
—
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-9 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
requirement. The paleontologist shall notify the City of the procedures that must be followed before construction is allowed to resume at the location of the find. If the find is determined to be significant and the Paleontologist determines that avoidance is not feasible, the paleontologist shall design and carry out a data recovery plan consistent with the Society of Vertebrate Paleontology standards. The plan shall be submitted to the City for review and approval. Upon approval, the plan shall be incorporated into the project. The Paleontologist shall also perform appropriate technical analyses, prepare a full written report and file it with the appropriate information center, and provide for permanent curation of any recovered resources.

MM CUL-5: If human remains are encountered during earth- disturbing activities for the Project, all work within 100 feet of the find shall stop immediately, an Environmentally Sensitive Area (ESA) physical demarcation/barrier constructed, and the San Bernardino County Coroner’s office shall be notified. If the Coroner determines the remains are Native American in origin, the NAHC will be notified and, in turn, will notify the person determined to be the Most Likely Descendent (MLD). The MLD will provide recommendations for treatment of the remains (CEQA Guidelines § 15064.5; Health and Safety Code § 7050.5; Public Resources Code §§ 5097.94 and 5097.98).

Ongoing
Throughout
Construction
Activities
Site Monitoring Qualified
Archaeologist
Geology and Soils
MM GEO-1b: Prior to the recordation of any tract map in the area north of the South Branch of the San Andreas Fault (PlanningArea15), the developer must demonstrate that the Reservoir in Planning Area 2 will have no impact on any homes in Planning Area 1 from a seiche event that could occur from strong seismic ground shaking. The Reservoir must be designed to withstand anticipated seismic shaking and must be dyked or otherwise protected so as to protect downstream homes from seiche flow damage.

Prior to the
recordation of any
map in the area
north of the South
Branch of the San
Andreas Fault.

Direct Observations,
Site Inspections
City of San
Bernardino
Community
Development &
Housing
Department
MM GEO-3a: Prior to the commencement of grading activities, the applicant shall retain a qualified geotechnical consultant to test any Prior to Grading
Activities
Direct Observations,
Site Inspections
City of San
Bernardino
—
—
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-10 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
areas planned for development that are underlain by existing imported fill soils to determine their in-situ compaction and suitability for excavation and reuse as engineered fill. Soil testing can be avoided if the applicant elects to remove the fill and place it either in areas where it will not support buildings, be located in paved or landscaped areas, or be disposed of offsite. This measure shall be implemented to the satisfaction of the City Geologist.

Community
Development &
Housing
Department
MM GEO-3b: The developer shall implement the grading
recommendations identified in the 2021 Leighton Report GeoMat 2007 and the CHJ 2006 reports. Prior to the commencement of building construction, the applicant shall retain a qualified engineer to design foundations adequate to support the Project’s structures where necessary, based on the recommendations of the 2021 Leighton ReportGeoMat 2007 study. Settlement analysis shall be performed once the structural design loads and foundation system geometry have been defied for each building.

Prior to Issuance of
Building Permit
Direct Observation of
Grading and
Foundation Designs
City of San
Bernardino
Community
Development &
Housing
Department
Hazards and Hazardous Materials
MM HAZ-1: Prior to issuance of occupancy permits, the developer shall prepare a Post-Fire/Flood Recovery Plan for review and approval by the City. As appropriate, this plan shall incorporate planning guidelines from the Alluvial Fan Task Force (AFTF) established by the California Department of Water Resources (DWR).

The plan will identify the potential risks to Project residents from various natural hazards from being located in the fire-prone foothills and adjacent to a large natural waterway (Badger Creek). The plan will outline measures to be implemented after major fires or floods that will help protect future project residents to the practical degree.

When approved, this plan shall be incorporated into the Specific Plan.

Prior to Issuance of
Occupancy Permits
Direct Observation of
Post-Fire/Flood
Recovery Plan.

City of San
Bernardino
Community
Development &
Housing
Department
Hydrology and Water Quality
MM HYD-1a: Prior to the issuance of grading permits for any portion or phase of the project, the project applicant shall receive City approval SWPPP and Grading Plan to the City of San Bernardino that identify specific actions and BMPs to prevent stormwater pollution Prior to Issuance of
Grading Permits
Direct Observations
and Review of SWPPP
and Grading Plan
City of San
Bernardino
Community
Development &
—
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-11 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
from construction sources. These BMPs shall be consistent with the Conceptual Water Quality Management Plan prepared for the project by PBS&J Engineers (see DEIR Appendix G)Q3 Consulting. The plans shall identify a practical sequence for site restoration, BMP implementation, contingency measures, responsible parties, and agency contacts. The applicant shall include conditions in construction contracts requiring the plans to be implemented and shall have the ability to enforce the requirement through fines and other penalties. The plans shall incorporate control measures in the following categories:
•Soil stabilization practices.
•Dewatering practices (if necessary).
•Sediment and runoff control practices.
•Monitoring protocols; and
•Waste management and disposal control practices.

Once approved by the City, the applicant’s contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting, and maintaining the control measures included in the SWPPP and Grading Plan.

Housing
Department
MM HYD-1b: Each SWPPP shall identify pollutant sources that could affect the quality of stormwater discharges from the construction site. Control practices shall include those that effectively treat target pollutants in stormwater discharges anticipated from project construction sites. To protect receiving water quality, the SWPPP shall include, but is not limited to, the following elements:
•Temporary erosion control measures (such as fiber rolls, staked straw bales, detention basins, temporary inlet protection, check dams, geofabric, sandbag dikes, and temporary revegetation or other ground cover) shall be employed for disturbed areas. •No disturbed surfaces will be left without erosion control measures in place during the winter and spring months
(September 30 – March 30).
•Sediment shall be retained onsite by a system of sediment basins, traps, or other appropriate measures. Of critical Prior to Issuance of
Grading Permits
Direct Observations
and Review of SWPPP
Pollutant Sources
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-12 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
importance is the protection of existing catch basins that eventually drain to Cajon Creek.
•The construction contractor shall prepare Standard Operating Procedures for the handling of hazardous materials on the construction site to eliminate or reduce discharge of materials to storm drains.
•BMPs performance and effectiveness shall be determined either by visual means where applicable (i.e., observation of above- normal sediment release), or by actual water sampling in cases where verification of contaminant reduction or elimination, (inadvertent petroleum release) is required to determine adequacy of the measure.
•Native grasses or other appropriate vegetative covers shall be established on the construction site as soon as possible after disturbance.

MM HYD-2a: Landscaping Management Plan. The developer shall develop and implement a Landscaping Management Plan (LMP) for landscaped areas with the goal of reducing potential discharge of herbicides, pesticides, fertilizers, and other contaminants to local waterways. All contractors involved in project-related landscaping conducted during the individual phases of development, as well as maintenance of landscaping following project completion, shall complete their work in strict compliance with the LMP. The applicant shall be responsible for ensuring that requirements of the LMP are provided to and instituted by future project landowners and managers following project completion. The LMP shall be prepared by a licensed landscape architecture firm with experience in methods to reduce or eliminate the use of landscape chemicals that could cause adverse effects to the environment. At a minimum, this LMP shall:

1. Require that pesticides and fertilizers not be applied in excessive quantities, and only applied at times when rain is not expected for at least 2 weeks, in an effort to minimize leaching and runoff into the storm drainage system.

Prior to Issuance of
Grading Permit
Direct Observation and
Review of Landscaping
Management Plan
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-13 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials

2. Encourage the use of organic fertilizers and mulching of landscaped areas inhibit weed growth and reduce water
demands.

3. Utilize native, perennial, drought-tolerant vegetation to minimize irrigation needs.

4. Specify the maintenance measures to be used (e.g., mowing) and will specify an application schedule for all fertilizer amendments and pesticide applications.

5. Identify a list of preferred herbicides and pesticides and instances in which their use would be appropriate and the associated application rate.

MM HYD-2b: Water Quality Maintenance Reports. The UHSP project shall form a Landscaping and Lighting Maintenance District (LLMD) to monitor water quality and provide regular reports to the City regarding water quality on the project site. A qualified professional shall be retained through the LLMD to prepare and provide annual documentation to the City Engineer that the onsite BMPs (i.e., water quality devices, improvements, and procedures) are functioning as planned to effectively protect water quality both onsite and on downstream uses/drainages. This includes the function and condition of bioswales, street sweeping, etc. These reports shall be made to the satisfaction of the City Engineer in consultation with the RWQCB if necessary. If a report indicates water quality objectives are not being met and/or the RWQCB has expressed concerns in this regard, the LLMD will take appropriate steps and/or make appropriate improvements to achieve these objectives, to the satisfaction of the City Engineer.

Prior to Issuance of
Grading Permit
Direct Observation and
Review of Landscaping
and Lighting
Maintenance District
(LLMD)
City of San
Bernardino
Community
Development &
Housing
Department
MM HYD-5: Prior to approval of any final maps, the developer shall submit drainage plans to the City Public Works Department for review and approval. The City shall review and approve all storm drain improvement plans prior to issuance of any encroachment or building permits that involve flood control facilities.

Prior to Approval
of any Final Maps
Direct Observation of
Drainage Plans
City of San
Bernardino
Community
Development &
Housing
Department
Land Use

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-14 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
MM LU-1: Prior to issuance of any occupancy permits, the developer shall coordinate with City, CSUSB, and USFS staffs to identify necessary access points and appropriate locations for such signage to clearly identify the USFS boundary along the perimeter of the University Hills property (i.e., Planning Area 24Planning Areas 1 and 2). Such signage will be placed at strategic locations, including any road or trail access points, to the satisfaction of the City in consultation with CSUSB and USFS staffs.

Prior to Issuance of
Occupancy Permits
Direct Observation and
Site Inspections
City of San
Bernardino
Community
Development &
Housing
Department
Noise
MM NOI-1a: At the time the grading permit application is submitted, the project applicant shall submit a Construction Noise Mitigation Plan to the City for review and approval. The plan shall depict the location of staging areas for construction equipment and describe how noise would be mitigated for any nearby sensitive receptors.

At the time, the
Grading Permit
Application is
Submitted
Direct Observation and
Review of Construction
Noise Mitigation Plan
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1b: Stationary noise-generating equipment (such as pumps and generators) will be located as far as possible from nearby noise- sensitive receptors (i.e., homes located in PA 16-20Planning Area 1) and no closer than 200 feet from any existing home within the Project site once occupancy has begun.

Prior to Ground
Breaking
Disturbances
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1c: Noise-generating equipment will be shielded from nearby noise-sensitive receptors by noise-attenuating buffers such as structures or haul truck trailers.

Prior to Ground
Disturbing
Activities
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1d: Onsite noise sources located less than 600 feet from noise-sensitive receptors will be equipped with noise-reducing engine housings.

Prior to Ground
Breaking
Disturbances
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
-
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ---
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-15 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
MM NOI-1e: Portable acoustic barriers able to attenuate at least 6 dB will be placed around noise-generating equipment in the “East Village” portion Planning Area 2 of the project site.

Prior to Ground
Breaking
Disturbances
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1f: Water tanks and equipment storage, staging, and warm- up areas will be located as far from noise-sensitive receptors as possible, and at least 200 feet from any existing home within the Project site once occupancy has begun.

Prior to Ground
Breaking
Disturbances
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1g: All construction equipment shall utilize noise reduction features (e.g., mufflers and engine shrouds) that are no less effective than those originally installed by the manufacturer.

Prior to Ground
Breaking
Disturbances
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1h: No construction equipment shall be allowed to idle for more than 5 minutes if it is within 100 feet of an existing house.

Ongoing
Throughout
Construction
Activities
Direct Observation and
Site Inspection
City of San
Bernardino
Community
Development &
Housing
Department
MM NOI-1i: Prior to approval of any subsequent tentative tract maps, the developer shall submit noise studies as appropriate for any residences within the project to assure that exterior and interior noise levels meet City noise standards based on actual final floor elevations, actual roadway cross sections and elevations, onsite topography after grading, etc. Walls or other attenuating improvements shall be installed as needed based on the results of these studies to ensure onsite residences meet the City’s noise regulations.

Prior to Ground
Breaking Approval
of any Subsequent
Tentative Tract
Maps
Direct Observation of
Noise Studies
City of San
Bernardino
Community
Development &
Housing
Department
—
Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-16 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
Transportation and Circulation
MM TRANS-2: Recommended improvements may include a
combination of fee payments to established programs, construction of specific improvements, payment of a fair-share contribution toward future improvements, or a combination of these approaches.

For programmed improvements, the developer will pay into the regional transportation fee program. A summary of the intersection operations before and after implementation of these recommended improvements is provided on EIR Addendum Appendix D Table 9. A summary of the Project fair share percentages for these recommended improvements is provided on EIR Addendum
Appendix D, Traffic Impact Analysis Table 5 and similarly on Table 13 of the EIR Addendum.
•#5 – University Parkway at I-215 Freeway NB Ramps: Add a third westbound right-turn lane.
•#6 – University Parkway at I-215 Freeway SB Ramps: Add a dedicated northbound right-turn lane.

Prior to Issuance of
the Building
Permit.

Identified future
improvements that are
not currently in the
City's Master Facilities
Plan (MFP) will be
added and the
Developer Impact Fee
(DIF) adjusted to
include the additional
costs, then the project
will pay the
appropriate DIF
amount. The project
will pay the
appropriate fee for the
indicated future
improvements that are
already in the MFP and
DIF programs. It is
understood that some
freeway-related
improvements,
including some future
ramp improvements,
may not be fully
funded from available
sources in the future.
(Please refer to
Table 5-2 for
implementation and
funding of this
mitigation).

City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-17 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
MM TRANS-8: Prior to the commencement of construction, the developer shall provide a Construction Traffic, Staging, and Parking Management Plan to the City of San Bernardino for review and approval. All construction contracts shall include a clause requiring compliance with the Construction Traffic, Staging, and Parking Management Plan and the developer shall be able to enforce the provisions of the plan through penalties, up to and including, termination of the contract. The plan shall include the following provisions:
•Construction truck traffic shall be limited to the following designated routes: Campus Parkway from the site and west of Northpark Boulevard to Kendall Drive, and Kendall Drive from Campus Parkway to Palm Avenue. Construction truck traffic shall be prohibited on all other roadways, unless compelling
circumstances warrant such movements (e.g., a major traffic accident).
•Signage shall be installed at construction truck ingress and egress points alerting motorists to such movements.
•Soil, debris, or other loose materials shall be covered with tarps or other restraining material during haul movements on
roadways.
•On-site and off-site construction staging and parking locations shall be identified, as well as any necessary shuttle service needed to transport workers from off-site locations. For safety reasons, off-site staging or parking shall not be allowed west of Northpark Boulevard or on the CSUSB Cal State San Bernardino campus.
•A pre-construction conference shall be held advising all construction contractors of the requirements of the
Construction Traffic, Staging, and Parking Management Plan.

Prior to
Construction
Activities
Review of Construction
Traffic, Staging, and
Parking Management
Plan
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-18 October 2025
Verification
Mitigation Measures (MMs) Implementation
Timing
Monitoring/ Reporting
Methods
Responsible for
Approval/
Monitoring Date Initials
Utilities and Service Systems
MM US-4a: Prior to the issuance of building permits, the applicant shall submit a Construction Debris Recycling Plan to the City of San Bernardino identifying the procedures by which construction and demolition would be salvaged and recycled to the maximum extent feasible. The plan shall include proof that a construction and demolition debris recycler is under contract to the applicant to perform this work. This Plan shall achieve at least a 50 percent reduction in construction waste, to the satisfaction of the City Planner.

Prior to the
Issuance of
Building Permits
Review of Construction
Debris Recycling Plan
City of San
Bernardino
Community
Development &
Housing
Department
MM US-4b: Prior to the issuance of occupancy permits, the developer shall provide the City with written assurance that all project residents will be provided with information on City and County waste reduction and disposal activities. This information may be provided by the developer or homeowners association (HOA) as appropriate. This measure shall be implemented to the satisfaction of the City Planner.

Prior to Issuance of
Occupancy Permits
Review of Information
on City and County
Waste Reduction and
Disposal Activities
City of San
Bernardino
Community
Development &
Housing
Department

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-19 October 2025
Conditions of Approval (COAs)
Verification
Tribal Cultural Resources Implementation
Timing
Monitoring/
Reporting Methods
Responsible for
Approval/
Monitoring Date Initials
COA TCR-1 Due to the heightened cultural sensitivity of the proposed project area, at the discretion of the consulting tribe(s), Tribal monitor(s) authorized to represent YSMN shall be present for all ground-disturbing activities that occur within the proposed project area (which includes, but is not limited to, tree/shrub removal and planting, clearing/grubbing, grading, excavation, trenching, compaction, fence/gate removal and installation, drainage and irrigation removal and installation, hardscape installation [benches, signage, boulders, walls, seat walls, fountains, etc.], and archaeological work). At the discretion of the consulting tribes, a sufficient number of Tribal monitors shall be present each workday to ensure that simultaneously occurring ground disturbing activities receive thorough levels of monitoring coverage. A Monitoring and Treatment Plan that is reflective of the project mitigation (“Cultural Resources” and “Tribal Cultural Resources”) shall be completed by the qualified SOI Archaeologist and submitted to the Lead Agency for dissemination to YSMN. Once all parties review and agree to the plan, it shall be adopted by the Lead Agency – the plan must be adopted prior to permitting for the project. Any and all findings will be subject to the protocol detailed within the Monitoring and Treatment Plan.

During All
Ground
Disturbing
Activities
Monitoring Tribal Monitor
Approved by
YSMN and
City of San
Bernardino
Community
Development &
Housing
Department
COA TCR-2 If a pre-contact cultural resource is discovered during project implementation, ground-disturbing activities shall be suspended 60 feet around the resource(s), and an Environmentally Sensitive Area (ESA) physical demarcation/barrier constructed.

The SOI Project Archaeologist shall develop a research design that shall include a plan to evaluate the resource for significance under CEQA criteria. Representatives from YSMN, the Archaeologist, and the Lead Agency shall confer regarding the research design, as well as any testing efforts needed to delineate the resource boundary.

Following the completion of evaluation efforts, all parties shall confer regarding the resource's archaeological significance, its potential as a Tribal Cultural Resource (TCR), and avoidance (or other appropriate treatment) of the discovered resource.

During All
Ground
Disturbing
Activities
Site Monitoring Qualified SOI
Archaeologist

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-20 October 2025
Conditions of Approval (COAs)
It is the preference of YSMN that removed cultural material be reburied as close to the original find location as possible. However, should reburial within/near the original find location during project implementation not be feasible, then a reburial location for future reburial shall be decided upon by YSMN, the landowner, and the Lead Agency, and all finds shall be reburied within this location.

Additionally, in this case, reburial shall not occur until all ground- disturbing activities associated with the project have been completed, all monitoring has ceased, all cataloguing and basic recordation of cultural resources have been completed, and a final monitoring report has been issued to Lead Agency, CHRIS, and YSMN.

All reburials are subject to a reburial agreement that shall be developed between the landowner and YSMN outlining the
determined reburial process/location and shall include measures and provisions to protect the reburial area from any future impacts.

Should it occur that avoidance, preservation in place, and on-site reburial are not an option for treatment, the landowner shall relinquish all ownership and rights to this material and confer with YSMN to identify an American Association of Museums (AAM)- accredited facility within the County that can accession the materials into their permanent collections and provide for the proper care of these objects in accordance with the 1993 CA Curation Guidelines.  A curation agreement with an appropriate qualified repository shall be developed between the landowner and museum that legally and physically transfers the collections and associated records to the facility.  This agreement shall stipulate the payment of fees necessary for permanent curation of the collections and associated records and the obligation of the Project developer/applicant to pay for those fees.

All draft records/reports containing the significance and treatment findings and data recovery results shall be prepared by the archaeologist and submitted to the Lead Agency and YSMN for their review and comment. After approval from all parties, the final reports and site/isolate records are to be submitted to the local CHRIS Information Center, the Lead Agency, and YSMN.

Addendum to the University Hills Specific Plan Project
City of San Bernardino Mitigation Monitoring and Reporting Program Page C-21 October 2025
Conditions of Approval (COAs)
Transportation and Circulation
Table 13: Summary of Project Fair Share for Recommended Improvements AM Peak Hour PM Peak Hour
Total Volume Total VolumeInt. # Intersection
2022 2026
Total
Growth
Project
Trips %
2022 2026
Total
Growth
Project
Trips %
Opening Year 2026 Cumulative Conditions
5 University Pkw. At I215
Freeway NB Ramps
3,663 4,23
7 578 128 22.3% 4,16
5 4,84
2 677 169 25.0%
Future Build-Out Year 2040 Cumulative Conditions
5 University Pkw. At I215
Freeway NB Ramps
3,663 4,37
9 716 128 17.9% 4,16
5 4,92
6 761 169 22.2%
6 University Pkw. At I215
Freeway SB Ramps
2,448 3,11
2 664 104 15.7% 2,97
0 3,98
6 1,016 91 9.0%
Source: Kimley-Horn. 2025. Traffic Impact Analysis: Table 5, Summary of Project Fair Share for Recommended Improvements.