1.1SECTION INCLUDES
A. Work included in 22 00 00, Plumbing Basic Requirements applies to Division 22, Plumbing work to provide materials, labor, tools, permits, incidentals, and other services to provide and make ready for Owner's use of plumbing systems for proposed project.
B. Contract Documents include, but are not limited to, Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Drawings, Addenda, Owner/Architect Agreement, and Owner/Contractor Agreement. Confirm requirements before commencement of work.
C. Definitions:
1. Provide: To furnish and install, complete and ready for intended use.
2. Furnish: Supply and deliver to project site, ready for unpacking, assembly and installation.
3. Install: Includes unloading, unpacking, assembling, erecting, installation, applying, finishing, protecting, cleaning and similar operations at project site as required to complete items of work furnished.
4. Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent", substitution requests must be submitted to Engineer for consideration, in accordance with Division 01, General Requirements, and approved by the Engineer prior to submitting bids for substituted items.
5. Authority Having Jurisdiction (AHJ): Indicates reviewing authorities, including local fire marshal, Owner's insurance underwriter, Owner's Authorized Representative, and other reviewing entity whose approval is required to obtain systems acceptance.
1.2 RELATED SECTIONS
A. Contents of Section applies to Division 22, Plumbing Contract Documents.
B. Related Work:
1. Additional conditions apply to this Division including, but not limited to:
a. Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements.
b. Drawings
c. Addenda
d. Owner/Architect Agreement
e. Owner/Contractor Agreement
f. Codes, Standards, Public Ordinances and Permits
1.3 REFERENCES AND STANDARDS
A. References and Standards per Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, individual Division 22, Plumbing Sections and those listed in this Section.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 740
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-2
B. Codes to include latest adopted editions, including current amendments, supplements and local jurisdiction requirements in effect as of the date of the Contract Documents, of/from:
1. State of California:
a. CBC - California Building Code
b. CEC - California Electrical Code
c. CEC T24 - California Energy Code Title 24
d. CFC - California Fire Code
e. CMC - California Mechanical Code
f. CPC - California Plumbing Code
g. CSFM - California State Fire Marshal
C. Reference standards and guidelines include but are not limited to the latest adopted editions from:
1. ABA - Architectural Barriers Act
2. ADA - Americans with Disabilities Act
3. AHRI - Air-Conditioning Heating & Refrigeration Institute
4. ANSI - American National Standards Institute
5. ASCE - American Society of Civil Engineers
6. ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers
7. ASHRAE Guideline 0, the Commissioning Process
8. ASME - American Society of Mechanical Engineers
9. ASPE - American Society of Plumbing Engineers
10. ASSE - American Society of Sanitary Engineering
11. ASTM - ASTM International
12. AWWA - American Water Works Association
13. CFR - Code of Federal Regulations
14. CGA - Compressed Gas Association
15. CISPI - Cast Iron Soil Pipe Institute
16. ETL - Electrical Testing Laboratories
17. EPA - Environmental Protection Agency
18. FM - FM Global
19. IAPMO - International Association of Plumbing and Mechanical Officials
20. GAMA - Gas Appliance Manufacturers Association
21. HI - Hydraulic Institute Standards
22. ISO - International Organization for Standardization
23. MSS - Manufacturers Standardization Society
24. NEC - National Electric Code
25. NEMA - National Electrical Manufacturers Association
26. NFGC - National Fuel Gas Code
27. NFPA - National Fire Protection Association
28. NRCA - National Roofing Contractors Association
29. NSF - National Sanitation Foundation
30. OSHA - Occupational Safety and Health Administration
31. SMACNA - Sheet Metal and Air Conditioning Contractors' National Association, Inc.
32. TEMA - Tubular Exchanger Manufacturers Association
33. TIMA - Thermal Insulation Manufacturers Association
34. UL - Underwriters Laboratories Inc.
D. See Division 22, Plumbing individual Sections for additional references.
1.4 SUBMITTALS
A. See Division 01, General Requirements for Submittal Procedures as well as specific individual Division 22, Plumbing Sections.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 741
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-3
B. Provide drawings in format and software release equal to the design documents. Drawings to be the same sheet size and scale as the Contract Documents.
C. In addition:
1. "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract Documents. Contractor is responsible for the dimensions and quantity and will confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work.
2. Provide product submittals and shop drawings in electronic format only. Electronic format must be submitted via zip file via e-mail. For electronic format, provide one file per division containing one bookmarked PDF file with each bookmark corresponding to each Specification Section. Arrange bookmarks in ascending order of Specification Section number. Individual submittals sent piecemeal in a per Specification Section method will be returned without review or comment. All transmissions/submissions to be submitted to Architect. At Contractor’s option, two separate submittals may be provided, consisting of underground work and building work. Deviations will be returned without review.
3. Product Data: Provide Manufacturer's descriptive literature for products specified in Division 22, Plumbing Sections.
4. Identify/mark each submittal in detail. Note what differences, if any, exist between the submitted item and the specified item. Failure to identify the differences will be considered cause for disapproval. If differences are not identified and/or not discovered during the submittal review process, Contractor remains responsible for providing equipment and materials that meet the Specifications and Drawings. a. Label submittal to match numbering/references as shown in Contract Documents and schedules. Highlight and label applicable information to individual equipment or cross out/remove extraneous data not applicable to submitted model. Clearly note options and accessories to be provided, including field installed items.
Highlight connections by/to other trades.
b. Include technical data, installation instructions and dimensioned drawings for products, fixtures, equipment and devices installed, furnished or provided.
Reference Division 22, Plumbing Sections for specific items required in product data submittal outside of these requirements.
c. Provide pump curves, operation characteristics, capacities, ambient noise criteria, etc. for equipment.
d. For vibration isolation of equipment, list make and model selected with operating load and deflection. Indicate frame type where required. Submit manufacturer's product data.
e. See Division 22, Plumbing Sections for additional submittal requirements outside of these requirements.
5. Maximum of two reviews of complete submittal package. Arrange for additional reviews and/or early review of long-lead items; bear costs of additional reviews at Engineer's hourly rates. Incomplete submittal packages/submittals will be returned to Contractor without review.
6. Structural/Seismic: Provide weights, dimensions, mounting requirements and like information required for mounting, seismic bracing, and support. Indicate manufacturer's installation and support requirements to meet ASCE 7-16 requirements for non-structural components. Provide engineered seismic drawings and equipment seismic certification.
Equipment Importance Factor as specified in Division 01 and in Structural documents.
7. Trade Coordination: Include physical characteristics, electrical characteristics, device layout plans, wiring diagrams, and connections as required per Division 22, Plumbing Coordination Documents. For equipment with electrical connections, furnish copy of approved submittal for inclusion in Division 26, Electrical submittals.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 742
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-4
8. Make provisions for openings in building for admittance of equipment prior to start of construction or ordering of equipment.
9. Substitutions and Variation from Basis of Design:
a. The Basis of Design designated product establishes the qualities and characteristics for the evaluation of any comparable products by other listed acceptable manufacturers if included in this Specification or included in an approved Substitution Request as judged by the Design Professional. b. If substitutions and/or equivalent equipment/products are being proposed, it is the responsibility of parties concerned, involved in, and furnishing the substitute and/or equivalent equipment to verify and compare the characteristics and requirements of that furnished to that specified and/or shown. If greater capacity and/or more materials and/or more labor is required for the rough-in, circuitry or connections than for the item specified and provided for, then provide compensation for additional charges required for the proper rough-in, circuitry and connections for the equipment being furnished. No additional charges above the Base Bid, including resulting charges for work performed under other Divisions, will be allowed for such revisions. Coordinate with the requirements of "Submittals." For any product marked "or approved equivalent," a substitution request must be submitted to Engineer for approval prior to purchase, delivery or installation.
10. Shop Drawings: Provide coordinated Shop Drawings which include physical characteristics of all systems, equipment and piping layout plans, and control wiring diagrams. Reference individual Division 22, Plum bing Sections for additional requirements for Shop Drawings outside of these requirements. a. Provide Shop Drawings indicating sanitary and storm cleanout locations and type to Architect for approval prior to installation.
b. Provide Shop Drawings indicating access panel locations, size and elevation for approval prior to installation.
11. Samples: Provide samples when requested by individual Sections.
12. Resubmission Requirements:
a. Make corrections or changes in submittals as required in response to Engineer’s comments. Provide a cover letter with resubmittal that includes responses to each of the Engineer’s submittal review comments and identifies changes in the resubmittal. Cloud changes in the submittals.
1) Resubmit for review until review indicates “no exception taken” or “make corrections noted.”
2) When submitting drawings for Engineer's re-review, clearly indicate changes on drawings and cloud any revisions. Submit a list describing each change.
13. Operation and Maintenance Manuals, Owner's Instructions:
a. Submit, at one time, electronic files (PDF format) of manufacturer's operation and maintenance instruction manuals and parts lists for equipment or items requiring servicing. Include valve charts. Submit data when work is substantially complete and in same order format as submittals. Include name and location of source parts and service for each piece of equipment.
1) Include copy of approved submittal data along with submittal review letters received from Engineer. Data to clearly indicate installed equipment model numbers. Delete or cross out data pertaining to other equipment not specific to this project.
2) Include copy of manufacturer's standard Operations and Maintenance for equipment. At front of each tab, provide routine maintenance documentation for scheduled equipment. Include manufacturer's recommended maintenance schedule and highlight maintenance required to maintain warranty. Furnish list of routine maintenance parts, including part numbers, sizes, quantities, relevant to each piece of equipment: belts, motors, lubricants, and filters.
3) Include copy of complete parts list for equipment. Include available exploded views of assemblies and sub assemblies.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 743
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-5
4) Include copy of startup and test reports specific to each piece of equipment. 5) Include copy of final water systems balancing log along with pump operating data.
6) Include commissioning reports.
7) Include copy of pressure, flow, leakage and purity test data and water systems test data, as applicable. Include copy of third-party and state and local jurisdiction inspection reports.
8) Include copy of valve charts/schedules.
9) Include Warranty per Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
10) Include product certificates of warranties and guarantees. 11) Engineer will return incomplete documentation without review. Engineer will provide one set of review comments in Submittal Review format. Contractor must arrange for additional reviews; Contractor to bear costs for additional reviews at Engineer's hourly rates.
b. Thoroughly instruct Owner in proper operation of equipment and systems. Where noted in individual Sections, training will include classroom instruction with applicable training aids and systems demonstrations. Field instruction per Section 22 00 00, Plumbing Basic Requirements article titled "Demonstration." c. Copies of certificates of code authority inspections, acceptance, code required acceptance tests, letter of conformance and other special guarantees, certificates of warranties, specified elsewhere or indicated on Drawings.
14. Record Drawings:
a. Maintain at site at least one set of drawings for recording “As-constructed” conditions. Indicate on Drawings changes to original documents by referencing revision document, and include buried elements, location of cleanouts, and location of concealed mechanical items. Include items changed by field orders, supplemental instructions, and constructed conditions.
b. Record Drawings are to include equipment and fixture/connection schedules that accurately reflect "as constructed or installed" for Project. c. At completion of project, input changes to original project on CAD Drawings and make one set of black-line drawings created from CAD Files in version/release equal to contract drawings. Submit CAD Files and drawings upon substantial completion.
d. Provide Invert elevations and dimensioned locations for water services, building waste, and storm drainage piping below grade extending to 5-feet outside building line.
e. See Division 22, Plumbing individual Sections for additional items to include in record drawings.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Work and materials installed to conform with all local, State and Federal codes, and other applicable laws and regulations. Where code requirements are at variance with Contract Documents, meet code requirements as a minimum requirement and include costs necessary to meet these in Contract. Machinery and equipment are to comply with OSHA requirements, as currently revised and interpreted for equipment manufacturer requirements. Install equipment provided per manufacturer recommendations.
B. Whenever this Specification calls for material, workmanship, arrangement or construction of higher quality and/or capacity than that required by governing codes, higher quality and/or capacity take precedence.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 744
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-6
C. Drawings are intended to be diagrammatic and reflect the Basis of Design manufacturers equipment. They are not intended to show every item in its exact dimensions, or details of equipment or proposed systems layout. Verify actual dimensions of systems (i.e., piping) and equipment proposed to assure that systems and equipment will fit in available space. Contractor is responsible for design and construction costs incurred for equipment other than Basis of Design, including, but not limited to, architectural, structural, electrical, HVAC, fire sprinkler, and plumbing systems.
D. Manufacturer's Instructions: Follow manufacturer's written instructions. If in conflict with Contract Documents, obtain clarification. Notify Engineer/Architect, in writing, before starting work.
E. Items shown on Drawings are not necessarily included in Specifications or vice versa. Confirm requirements in all Contract Documents.
F. Provide products that are UL listed.
G. Piping Insulation products to contain less than 0.1 percent by weight PBDE in all insulating materials.
H. All potable water system components, devices, material, or equipment containing a weighted average of greater than 0.25 percent lead are prohibited, and shall be certified in accordance with current editions of the Safe Drinking Water Act (SDWA), NSF 61 & NSF 372. Endpoint devices used to dispense water for drinking shall meet the requirements of NSF 61.
I. ASME Compliance: ASME listed water heaters and boilers with an input of 200,000 BTUH and higher, hot water storage tanks which exceed 120 gallons, and hot water expansion tanks which are connected to ASME rated equipment or required by code or local jurisdiction.
J. Provide safety controls required by National Boiler Code (ASME CSD 1) for boilers and water heaters with an input of 400,000 BTUH and higher.
1.6 WARRANTY
A. Provide written warranty covering the work for a period of one year from date of Substantial Completion in accordance with Division 00, Contracting and Procurement Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Sections under this Division can require additional and/or extended warranties that apply beyond basic warranty in Division 01, General Requirements and the General Conditions.
Confirm requirements in all Contract Documents.
1.7 COORDINATION DOCUMENTS
A. Prior to construction, prepare and submit coordinated layout drawings (composite drawings) to coordinate installation and location of ductwork, grilles, diffusers, piping, fire sprinklers, plumbing, lights, and electrical services. Composite Drawings show services on single sheet.
Key Drawings to structural column identification system. Prior to completion of Drawings, coordinate proposed installation with architectural and structural requirements, and other trades (including plumbing, HVAC, fire protection, electrical, ceiling suspension, and ceiling tile systems, etc.), and provide maintenance access requirements. Coordinate with submitted architectural systems (i.e. roofing, ceiling, finishes) and structural systems as submitted, including footings and foundation. Identify zone of influence from footings and ensure systems are not routed within the zone of influence.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 745
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-7
B. Prepare Drawings as follows:
1. Drawings in Revit Model. Revit Model release equal to design documents. Drawings to be same sheet size and scale as Contract Drawings and indicate location, size and elevation above finished floor of equipment and distribution systems.
2. Review and revise, as necessary, section cuts in Contract Drawings after verification of field conditions.
3. Indicate plumbing system piping including fittings, hangers, access panels, valves, and bottom of pipe elevations above finished floor.
4. Indicate inverts and provision for piping that must be graded to have right-of-way over more flexible items. Drawings also to indicate proposed ceiling grid and lighting layout as shown on electrical drawings and architectural reflected ceiling drawings and HVAC equipment, ductwork and piping.
5. Incorporate Addenda items and change orders.
6. Distribute drawings to trades and provide additional coordination as requested by other trades.
C. Advise Architect in the event a conflict occurs in location or connection of equipment. Bear costs resulting from failure to properly coordinate installation or failure to advise Architect of conflict.
D. Verify in field exact size, location, invert, and clearances regarding existing material, equipment and apparatus, and advise Architect of discrepancies between that indicated on Drawings and that existing in field prior to installation related thereto.
E. Submit final Coordination Drawings with changes as Record Drawings at completion of project.
1.8 WORK INCLUDED
A. Furnish and install sleeves, inserts and anchorage required for the installation, which are embedded in work of other trades. Sleeve, wrap and seal piping in concrete.
B. Electrical: For plumbing trim/devices/equipment, provide, from the line voltage connection by Division 26, the low voltage electrical connections and wiring as required for complete and operable system. Includes, but is not limited to: Low voltage electrical raceway, wiring and accessories, such as step-down transformers as necessary for function of sensors and automatic valve and faucet controls. Supply step-down transformers and size wiring as recommended by manufacturer of plumbing trim/faucets requiring electrical low voltage connection.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Articles, fixtures, and equipment of a kind to be standard product of one manufacturer, including but not limited to fixtures, pumps, drains and equipment.
2.2 STANDARDS OF MATERIALS AND WORKMANSHIP
A. Base contract upon furnishing materials as specified. Materials, equipment, and fixtures used for construction are to be new, latest products as listed in manufacturer's printed catalog data and are to be UL or ETL listed and labeled or be approved by State, County, and City authorities prior to procurement and installation.
B. Names and manufacturer's names denote character and quality of equipment desired and are not to be construed as limiting competition.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 746
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-8
C. Hazardous Materials:
1. Comply with local, State of California, and Federal regulations relating to hazardous materials.
2. Comply with Division 00, Procurement and Contracting Requirements and Division 01, General Requirements for this project relating to hazardous materials.
3. Do not use any materials containing a hazardous substance. If hazardous materials are encountered, do not disturb; immediately notify Owner and Architect. Hazardous materials will be removed by Owner under separate contract.
PART 3 - EXECUTION
3.1 ACCESSIBILITY AND INSTALLATION
A. Confirm Accessibility and Installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Install equipment requiring access (i.e., drain pans, drains, control operators, valves, motors, cleanouts and water heaters) so that they may be serviced, reset, replaced or recalibrated by service people with normal service tools and equipment. Do not install equipment in obvious passageways, doorways, scuttles or crawlspaces which would impede or block intended usage.
C. Install equipment and products complete as directed by manufacturer's installation instructions.
Obtain installation instructions from manufacturer prior to rough-in of equipment and examine instructions thoroughly. When requirements of installation instructions conflict with Contract Documents, request clarification from Architect prior to proceeding with installation. This includes proper installation methods, sequencing, and coordination with other trades and disciplines.
D. Earthwork:
1. Confirm Earthwork requirements in Contract Documents. In absence of specific requirements, comply with individual Division 22, Plumbing Sections and the following:
a. Perform excavation, dewatering, shoring, bedding, and backfill required for installation of work in this Division in accordance with the provisions of related earthwork Sections/divisions. Contact utilities and locate existing utilities prior to excavation. Repair any work damaged during excavation or backfilling. b. Excavation: Do not excavate under footings, foundation bases, or retaining walls. c. Provide protection of underground systems. Review the project Geotechnical Report for references to corrosive or deleterious soils which will reduce the performance or service life of underground systems materials.
E. Firestopping:
1. Confirm Firestopping requirements in Division 07, Thermal and Moisture Protection. In absence of specific requirements, comply with individual Division 22, Plumbing Sections and the following:
a. Coordinate location and protection level of fire and/or smoke rated walls, ceilings, and floors. When these assemblies are penetrated, seal around piping, ductwork and equipment with approved firestopping material. Install firestopping material complete as directed by manufacturer's installation instructions. Meet requirements of ASTM E814, Standard Test Method for Fire Tests of Through-Penetration Fire Stops.
F. Pipe Installation:
1. Provide installation of piping systems coordinated to account for expansion and contraction of piping materials and building as well as anticipated settlement or shrinkage October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 747
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-9
of building. Install work to prevent damage to piping, equipment, and building and its contents. Provide piping offsets, loops, expansion joints, sleeves, anchors or other means to control pipe movement and minimize forces on piping. Verify anticipated settlement and/or shrinkage of building with Project Structural Engineer. Verify construction phasing, type of building construction products and rating for coordinating installation of piping systems.
2. Include provisions for servicing and removal of equipment without dismantling piping.
G. Plenums:
1. Provide plenum rated materials that meet the requirements to be installed in plenums.
Immediately notify Architect/Engineer of discrepancy.
3.2 SEISMIC CONTROL
A. Confirm Seismic Control requirements in Division 01, General Requirements, Structural documents, and individual Division 22 Plumbing Sections.
B. General:
1. Earthquake resistant designs for Plumbing (Division 22) equipment and distribution, i.e. motors, plumbing systems, piping, equipment, water heaters, boilers, etc. to conform to regulations of jurisdiction having authority.
2. Restraints which are used to prevent disruption of function of piece of equipment because of application of horizontal force to be such that forces are carried to frame of structure in such a way that frame will not be deflected when apparatus is attached to a mounting base and equipment pad, or to structure in normal way, utilizing attachments provided. Secure equipment and distribution systems to withstand a force in direction equal to value defined by jurisdiction having authority.
3. Provide stamped Shop Drawings from licensed Structural Engineer of seismic bracing and seismic movement assemblies for piping equipment and water heaters. Submit Shop Drawings along with equipment submittals.
4. Provide stamped Shop Drawings from licensed Structural Engineer of seismic flexible joints for piping and crossing building expansion or seismic joints. Submit Shop Drawings along with seismic bracing details.
C. Piping:
1. Per CBC or local requirements.
D. Provide means to prohibit excessive motion of plumbing equipment during earthquake.
3.3 REVIEW AND OBSERVATION
A. Confirm Review and Observation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Notify Architect, in writing, at following stages of construction so that they may, at their option, visit site for review and construction observation:
1. Underground piping installation prior to backfilling.
2. Prior to covering walls.
3. Prior to ceiling cover/installation.
4. When main systems, or portions of, are being tested and ready for inspection by AHJ.
C. Bear responsibility and cost to make piping accessible, to expose concealed lines, or to demonstrate acceptability of the system. If Contractor fails to notify Architect at times prescribed above, costs incurred by removal of such work are the responsibility of the Contractor.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 748
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-10
D. Final Punch:
1. Prior to requesting a final punch visit from the Engineer, request from Engineer the Plumbing Precloseout Checklist, complete the checklist confirming completion of systems’ installation, and return to Engineer. Request a final punch visit from the Engineer, upon Engineer’s acceptance that the plumbing systems are ready for final punch.
2. Costs incurred by additional trips required due to incomplete systems will be the responsibility of the Contractor.
3.4 CUTTING AND PATCHING
A. Confirm Cutting and Patching requirements in Division 01, General Requirements. In absence of specific requirements, comply with individual Division 22, Plumbing Sections and the following:
1. Proposed floor cutting/core drilling/sleeve locations to be approved by Project Structural Engineer. Submit proposed locations to Architect/Project Structural Engineer. Where slabs are of post tension construction, perform x-ray scan of proposed penetration locations and submit scan results including proposed penetration locations to Project Structural Engineer/Architect for approval. Where slabs are of waffle type construction, show column cap extent and cell locations relative to proposed penetration(s).
2. Cutting, patching and repairing for work specified in this Division including plastering, masonry work, concrete work, carpentry work, and painting included under this Section will be performed by skilled craftspeople of each respective trade in conformance with appropriate Division of Work.
3. Additional openings required in building construction to be made by drilling or cutting.
Use of jack hammer is specifically prohibited. Patch openings in and through concrete and masonry with grout.
4. Restore new or existing work that is cut and/or damaged to original condition. Patch and repair specifically where existing items have been removed. This includes repairing and painting walls, ceilings, etc. where existing piping and devices are removed as part of this project. Where alterations disturb lawns, paving, and walks, surfaces to be repaired, refinished and left in condition matching existing prior to commencement of work.
5. Additional work required by lack of proper coordination will be provided at no additional cost to the Owner.
3.5 EQUIPMENT SELECTION AND SERVICEABILITY
A. Replace or reposition equipment which is too large or located incorrectly to permit servicing, at no additional cost to Owner.
3.6 DELIVERY, STORAGE AND HANDLING
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In absence of specific requirements, comply with individual Division 22, Plumbing Sections and the following:
1. Handle materials delivered to project site with care to avoid damage. Store materials on site inside building or protected from weather, dirt and construction dust. Insulation and lining that becomes wet from improper storage and handling to be replaced before installation. Products and/or materials that become damaged due to water, dirt and/or dust as a result of improper storage to be replaced before installation.
2. Protect equipment and pipe to avoid damage. Close pipe openings with caps or plugs.
Keep motors and bearings in watertight and dustproof covers during entire course of installation.
3. Protect bright finished shafts, bearing housings and similar items until in service.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 749
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-11
3.7 DEMONSTRATION
A. Confirm Demonstration requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Upon completion of work and adjustment of equipment and test systems, demonstrate to Owner's Authorized Representative, Architect and Engineer that equipment furnished and installed or connected under provisions of these Specifications functions in manner required.
Provide field instruction to Owner's Maintenance Staff as specified in Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
C. Manufacturer's Field Services: Furnish services of a qualified person at time approved by Owner, to instruct maintenance personnel, correct defects or deficiencies, and demonstrate to satisfaction of Owner that entire system is operating in satisfactory manner and complies with requirements of other trades that may be required to complete work. Complete instruction and demonstration prior to final job site observations.
3.8 CLEANING
A. Confirm cleaning requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Upon completion of installation, thoroughly clean exposed portions of equipment, removing temporary labels and traces of foreign substances. Throughout work, remove construction debris and surplus materials accumulated during work.
3.9 INSTALLATION
A. Confirm installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Install equipment and fixtures in accordance with manufacturer's installation instructions, plumb and level and firmly anchored to vibration isolators. Maintain manufacturer's recommended clearances.
C. Start up equipment, in accordance with manufacturer's start-up instructions, and in presence of manufacturer's representative. Test controls and demonstrate compliance with requirements.
Replace damaged or malfunctioning controls and equipment.
1. Do not place equipment in sustained operation prior to initial balancing of plumbing systems.
2. Provide pump impellers to obtain Basis of Design design capacities.
D. Provide miscellaneous supports/metals required for installation of equipment and piping.
3.10 PAINTING
A. Confirm requirements in Division 01, General Requirements and Division 09, Finishes. In absence of specific requirements, comply with individual Division 22, Plumbing Sections and the following:
1. Ferrous Metal: After completion of plumbing work, thoroughly clean and paint exposed supports constructed of ferrous metal surfaces, i.e., hangers, hanger rods, equipment October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 750
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-12
stands, with one coat of black asphalt for exterior or black enamel for interior, suitable for hot surfaces.
2. In a mechanical room, on roof or other exposed areas, machinery and equipment not painted with enamel to receive two coats of primer and one coat of rustproof enamel, colors as selected by Architect.
3. See individual equipment Specifications for other painting.
4. Structural Steel: Repair damage to structural steel finishes or finishes of other materials damaged by cutting, welding or patching to match original.
5. Piping: Clean, primer coat and paint exposed piping on roof or at other exterior locations with two coats paint suitable for metallic surfaces and exterior exposures. Color selected by Architect.
6. Covers: Covers such as manholes, cleanouts and the like will be furnished with finishes which resist corrosion and rust.
3.11 DEMOLITION
A. Confirm Demolition requirements in Division 01, General Requirements and Division 02, Existing Conditions. In absence of specific requirements, comply with individual Sections in Division 22, Plumbing and the following:
1. Scope:
a. It is the intent of these documents to provide necessary information and adjustments to plumbing system required to meet code, and accommodate installation of new work.
b. Coordinate with Owner so that work can be scheduled not to interrupt operations, normal activities, building access or access to different areas. c. Existing Conditions: Determine exact location of existing utilities and equipment before commencing work, compensate Owner for damages caused by failure to exactly locate and preserve underground utilities. Replace damaged items with new material to match existing. Promptly notify Owner if utilities are found which are not shown on Drawings.
2. Equipment: Unless otherwise directed, equipment, fixtures, or fittings being removed as part of demolition process are Owner's property. Remove other items not scheduled to be reused or relocated from job site as directed by Owner.
3. Unless specifically indicated on Drawings, remove exposed, unused piping to behind finished surfaces (floor, walls, ceilings, etc.). Cap piping and patch surfaces to match surrounding finish.
4. Unless specifically indicated on Drawings, remove unused equipment, fixtures, fittings, rough-ins, and connectors. Removal is to be to a point behind finished surfaces (floors, walls, and ceilings).
3.12 ACCEPTANCE
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In absence of specific requirements, comply with individual Sections in Division 22, Plumbing and the following:
1. System cannot be considered for acceptance until work is completed and demonstrated to Architect that installation is in strict compliance with Specifications, Drawings and manufacturer's installation instructions, particularly in reference to following:
a. Testing and Balancing Reports
b. Cleaning
c. Operation and Maintenance Manuals
d. Training of Operating Personnel
e. Record Drawings
f. Warranty and Guaranty Certificates
g. Start-up/Test Document and Commissioning Reports
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 751
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING BASIC REQUIREMENTS 22 00 00-13
B. Reference State of California requirements for specific testing procedures and documentation requirements. Comply with State and local governmental standards and requirements for testing, and completion and submittal of appropriate forms as required by Title 24 and local governmental agencies related to this work.
3.13 FIELD QUALITY CONTROL
A. Confirm Field Quality Control requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 22 00 00, Plumbing Basic Requirements and individual Division 22, Plumbing Sections.
B. Tests:
1. Conduct tests of equipment and systems to demonstrate compliance with requirements specified. Reference individual Specification Sections for required tests. Document tests and include in operation and maintenance manuals.
2. During site evaluations by Architect or Engineer, provide appropriate personnel with tools to remove and replace trims, covers, and devices so that proper evaluation of installation can be performed.
3.14 LETTER OF CONFORMANCE
A. Provide Letter of Conformance, copies of manufacturers' warranties and extended warranties with a statement that plumbing items were installed in accordance with manufacturer's recommendations, UL listings and FM Global approvals. Include Letter of Conformance, copies of manufacturers' warranties and extended warranties in Operation and Maintenance Manuals.
3.15 ELECTRICAL INTERLOCKS
A. Where equipment motors are to be electrically interlocked with other equipment for simultaneous operation, utilize plumbing equipment wiring diagrams to coordinate with electrical systems so that proper wiring of equipment involved is affected.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 752
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-1
SECTION 22 05 23
GENERAL-DUTY VALVES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Valves, General
2. Gate Valves
3. Ball Valves
4. Swing Check Valves
5. Lift Check Valves
6. Thermostatic Point-of-Use Mixing Valves (ASSE 1070 Rated)
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. California Standard AB 1953 and/or NSF/ANSI 372 for potable water services. Valves must be 3rd-party certified.
2. ISO 9001 Certified.
3. IAPMO Certified for Low Lead.
C. Source Limitations for Valves: Obtain each type of valve from a single source and from a single manufacturer.
D. Model numbers indicated as Basis-of-Design indicate valve characteristics. All valves are to meet code Low Lead/Lead Free Standards.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 753
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations for Valves: Obtain each type of valve from a single source and from a single manufacturer.
B. Valves, General:
1. Apollo
2. Armstrong
3. ASCO
4. Caleffi
5. Cla-Val
6. Conbraco
7. Crane
8. Clow
9. Griswold
10. Hammond
11. Hays
12. Jenkins
13. Josam
14. Kennedy
15. Milwaukee
16. Mueller
17. Nibco
18. Red-White Valve
19. Smith
20. Stockham
21. Tour Anderson
22. Wade
23. Watts
24. Wilkins
25. Zurn
26. Or approved equivalent.
C. Gate Valves:
1. See Valves, General above.
D. Ball Valves:
1. See Valves, General above.
2. NSF Valves:
a. Clow
b. Kennedy
c. Nibco
d. Or approved equivalent.
E. Swing Check Valves:
1. See Valves, General above.
F. Lift Check Valves:
1. See Valves General above.
G. Thermostatic Point-of-Use Mixing Valves (ASSE 1070 Rated):
1. Caleffi
2. Lawler
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 754
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-3
3. Leonard
4. Powers Hydroguard
5. Or approved equivalent.
2.2 VALVES - GENERAL
A. General:
1. Sizes: Unless otherwise indicated, provide valves of same size as upstream pipe size.
2. Operators: Provide handwheels, fastened to valve stem, for valves other than quarter- turn. Provide lever handle for quarter-turn valves 6-inches and smaller. Provide gear operators for quarter-turn valves 8-inches and larger and plug valves installed over 5-feet above finished floor.
3. Valve Identification: Manufacturer's name (or trademark) and pressure rating clearly marked on valve body.
B. Valves in Insulated Piping: With 2-inch stem extension and following features:
1. Ball Valves: With extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation on valve without breaking the vapor seal or disturbing insulation and memory stops that are fully adjustable after insulation is applied.
C. Valve-End Connections:
1. Flanged: With flanges according to ASME B16.1 for iron valves.
2. Solder Joint: With sockets according to ASME B16.18.
3. Threaded: With thread according to ASME B1.20.1.
D. Valve Bypass and Drain Connections: MSS SP-45.
E. Building Service:
1. Shutoff and Isolation Valves:
a. Pipe Sizes 3-inches and Smaller: Ball Valve.
2. Drain Service: Ball Valves.
3. Strainer Blow-Off: Ball Valve.
4. Check Valves: Swing.
2.3 GATE VALVES
A. Gate Valves - Class 150:
1. 2-inches and Smaller: Class 150, MSS SP-80, ASTM B62 cast bronze body, bronze bonnet, bronze wedge, non-rising stem, brass packing gland, non-asbestos packing and aluminum or malleable iron hand-wheel.
2. 2 1/2-inches and Larger: Class 150, MSS SP-70, ASTM A126 Grade B, IBBM, ductile iron body, bonnet and wedge, bronze trim, non-rising stem, brass packing gland, non- asbestos packing and cast iron hand-wheel.
2.4 BALL VALVES
A. All ball valves on brazed piping are to be three-piece.
B. 2-1/2 Inches and Smaller: MSS SP-110, 400-600 PSI, two-piece full port ball configuration, bronze body, extended soldered ends for copper pipe and threaded ends for iron pipe, lead-free brass or stainless steel ball, lead-free brass stem, Teflon seat, extended steel handle. Apollo 77CLF 100 Series two-piece.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 755
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-4
2.5 SWING CHECK VALVES
A. 2-inches and Smaller: Class 125, bronze body, horizontal swing, regrinding type, Y-pattern, renewable disc. Nibco 413. MSS SP-80.
B. 2-1/2-inches and Larger: Class 125, iron body, bolted bonnet, horizontal swing, renewable seat and disc, flanged ends. Nibco F918. MMS SP-71.
C. Rubber Flapper Check Valve: Horizontal or vertical upward flow installation. Working pressure to 175 PSI. Ductile iron or cast iron body. Steel reinforced Buna-N rubber flapper epoxy coating on wetted parts. MSS SP-80.
2.6 LIFT CHECK VALVES
A. 3-inches and Smaller: Bronze body, 125 PSI, spring loaded, Teflon seat. Steam Service, Teflon Disc: Apollo CYB-LF (Lead Free). Water, Gas or Oil Service, Buna-N Disc: MSS SP-80.
2.7 THERMOSTATIC POINT-OF-USE MIXING VALVES (ASSE 1070 RATED) A. Thermostatic type with bronze body construction, corrosion resistant materials, union end stops, check inlets with strainers, 0-200 degree F dial thermometer and discharge shut-off valve.
Mixing valves to meet ASSE 1070.
B. Maximum required delta temperature differential between hot water supply temperature and delivery temperature is 15 degrees F. Set valve outlet temperature per drawing requirements.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Prepare valves for shipping as follows:
1. Protect internal parts against rust and corrosion.
2. Protect threads, flange faces, and weld ends.
3. Set ball valves open to minimize exposure of functional surfaces.
4. Block check valves in either closed or open position.
B. Use the following precautions during storage:
1. Maintain valve end protection.
2. Store valves indoors and maintain at higher than ambient dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.
C. Inspect the shipping container before unpacking to look for damage that could have occurred during transport, and report it to the transportation company immediately. After visual inspection, remove the valve from the shipping container. Make sure the faces are free of any scratches and that there is not any obvious damage to the actuator assembly or valve body.
D. Make sure to note the valve's model number during the unpacking process. The model number will need to be provided when purchasing replacement parts.
E. Purge and clean all piping to be connected to valve.
F. Install per manufacturer's recommendations.
G. Determine that the valve and its plumbing piping is adequately supported when installed. If a valve is not adequately supported, this could prevent the valve from operating and sealing October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 756
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-5
correctly. Be sure that all mating flanges are in line and parallel to minimize straining on joints and valve body.
H. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.
I. Do not attempt to repair defective valves; replace with new valves.
J. Install valves where required for proper operation of piping and equipment, including valves in branch lines where necessary to isolate sections of piping. Locate valves so as to be accessible and so that separate support can be provided when necessary.
K. Install valves with stems pointed up, in vertical position where possible, but in no case with stems pointed downward from horizontal plane unless unavoidable. Install valve drains with hose end adapter and cap on chain for each valve that must be installed with stem below horizontal plane. Ensure installation provides full stem movement.
L. Insulation: Where insulation is indicated, install extended stem valves, arranged in proper manner to receive insulation.
M. Mechanical Actuators: Install with chain operators where indicated. Extend chains to 5-feet above floor and hook to clips to clear aisle passage.
N. Stem Selection: Outside screw and yoke stems, except provide inside screw, non-rising stem where space prevents full opening of OS&Y valves.
O. Seats: Renewable seats, except where otherwise indicated.
P. When soldering, use paste flux that are approved by the manufacturer for use with lead free alloys.
Q. If valve applications are not indicated on Drawings, use the following:
1. Shutoff Service: Ball valves.
R. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP classes or CWP ratings may be substituted.
S. Valves, except wafer/butterfly types, with the following end connections:
1. For Copper Tubing, 2-inches and Smaller: Threaded ends except where solder-joint valve-end.
2. For Steel Piping, 2-inches and Smaller: Threaded ends.
3. For Steel Piping, 2-1/2-inches to NPS 4-inches: Flanged ends except where threaded valve-end.
T. Valve Adjusting and Cleaning:
1. Inspect valves for leaks. Adjust or replace packing to stop leaks. Replace valve if leak persists.
2. Valve Identification. Tag valves per Section 22 05 53, Identification for Plumbing Piping and Equipment.
3.2 GATE VALVES INSTALLATION
A. See General Installation Requirements above.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 757
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23-6
3.3 BALL VALVES INSTALLATION
A. See General Installation Requirements above.
3.4 SWING CHECK VALVES INSTALLATION
A. See General Installation Requirements above.
B. Swing Check Valve Installation: Install in horizontal position with hinge pin horizontally perpendicular to centerline of pipe. Install for proper direction of flow. Only install where there are 10 pipe diameters of straight pipe upstream of valve.
C. Ejector and Sump Pump-Discharge Check Valves:
1. 2-inches and Smaller: Bronze swing or spring-loaded lift check valves with bronze disc.
2. 2-1/2-inches and Larger: Rubber flapper swing check valves with lever and weight.
D. Domestic Water and Circulation Pump Discharge Check Valves:
1. 2-inches and Smaller: Bronze body, spring loaded, lead free, lift check.
2. 2-1/2-inches and Larger: Wafer style, silent lift check valve, lead free.
3.5 LIFT CHECK VALVES INSTALLATION
A. See General Installation Requirements above.
B. Lift Check Valve Installation: Install in piping line with stem vertically upward, position for proper direction of flow.
C. Ejector and Sump Pump-Discharge Check Valves:
1. 2-inches and Smaller: Bronze swing or spring-loaded lift check valves with bronze disc.
2. 2-1/2-inches and Larger: Rubber flapper swing check valves with lever and weight.
D. Domestic Water and Circulation Pump Discharge Check Valves:
1. 2-inches and Smaller: Bronze body, spring loaded, lead free, lift check.
2. 2-1/2-inches and Larger: Wafer style, silent lift check valve, lead free.
3.6 THERMOSTATIC POINT-OF-USE MIXING VALVES (ASSE 1070 RATED) INSTALLATION A. See General Installation Requirements above.
B. Install mixing valve per manufacturer's instruction manual.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 758
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-1
SECTION 22 05 29
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Pipe Hangers and Supports for Plumbing Piping and Equipment
2. Wall and Floor Sleeves
3. Building Attachments
4. Flashing
5. Miscellaneous Metal and Materials
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. ASCE 7-16, Minimum Design Loads for Buildings and Other Structures.
2. Hanger spacing installation and attachment to meet all manufacturer's requirements and MSS SP-58.
3. Terminology: As defined in MSS SP-90 "Guidelines on Terminology for Pipe Hangers and Supports".
4. Install piping per SMACNA's requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.7 PERFORMANCE REQUIREMENTS
A. General - Provide pipe and equipment hangers and supports in accordance with the following:
1. When supports, anchorages, and seismic restraints for equipment, and supports, anchorages, and seismic restraints for piping are not shown on the Drawings, the contractor is responsible for their design.
2. Connections to structural framing are not to introduce twisting, torsion, or lateral bending in the framing members. Provide supplementary steel as required.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 759
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-2
B. Engineered Support Systems:
1. Support frames such as pipe racks or stanchions for piping and equipment which provide support from below.
2. Equipment and piping support frame anchorage to supporting slab or structure.
C. Provide channel support systems, for piping to support multiple pipes capable of supporting the combined weight of supported systems, system contents and test water.
D. Provide heavy-duty steel trapezes for piping to support multiple pipes capable of supporting the combined weight of supported systems, system contents and test water.
E. Provide seismic restraint hangers and supports for piping and equipment.
F. Obtain approval from AHJ for seismic restraint hanger and support system to be installed for piping and equipment.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Pipe Hangers and Supports for Plumbing Piping and Equipment:
1. Pipe Hangers/Supports:
a. B-Line Systems Inc.
b. Anvil International
c. HOLDRITE
d. Erico Co. Inc.
e. Snappitz Thermal Pipe Shield Manufacturing
f. Rilco Manufacturing Co. Inc.
g. Nelsen-Olson Inc.
h. Or approved equivalent.
2. Channel Support Systems:
a. B-Line Systems Inc.
b. Anvil International, Anvit-Strut
c. Erico Hanger Co. Inc.; O-Strut Div.
d. Unistrut Corp.
e. HOLDRITE EZ-Strut Systems
f. Or approved equivalent.
3. Thermal-Hanger Shield Inserts:
a. Erico Hanger Co. Inc.
b. Pipe Shields, Inc.
c. Rilco Manufacturing Co. Inc.
d. HOLDRITE Insulation Couplings
e. Or approved equivalent.
4. Freestanding Roof Supports:
a. Miro
b. Nelson-Olsen Inc. / Quick "Pipe" Block
c. Eaton / B-Line / Dura-Blok
d. Mifab
e. Or approved equivalent.
5. Pipe Alignment and Secondary Supports:
a. HOLDRITE
b. Starquick
c. Or approved equivalent.
B. Wall and Floor Sleeves:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 760
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-3
1. Pre-Engineered Firestop Pipe Penetration Systems:
a. HOLDRITE HydroFlame
b. Proset
c. Or approved equivalent.
C. Building Attachments:
1. Anchor-It
2. Gunnebo Fastening Corp.
3. ITW Ramset / Red Head
4. Masterset Fastening Systems, Inc.
5. Or approved equivalent.
D. Flashing:
1. Fastenal
2. Or approved equivalent.
E. Miscellaneous Metal and Materials:
1. See Miscellaneous Metal and Materials article below.
2. Powder-Actuated Fastener Systems:
a. Gunnebo Fastening Corp.
b. Hilti, Inc.
c. ITW Ramset / Red Head
d. Masterset Fastening Systems, Inc.
e. Or approved equivalent.
2.2 PIPE HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT A. Horizontal Piping Hangers and Supports - Horizontal and Vertical Piping, and Hanger Rod Attachments:
1. Factory fabricated horizontal piping hangers and supports to suit piping systems in accordance manufacturer's published product information.
2. Use only one type by one manufacturer for each piping service.
3. Select size of hangers and supports to exactly fit pipe size for bare piping and to exactly fit around piping insulation with saddle or shield for insulated piping.
4. Provide copper-plated hangers and supports for uninsulated copper piping systems.
5. Provide padded pipe hangers, clamps and supports for thermoplastic piping system.
6. Install no hub cast iron pipe and fittings per CISPI 301-09 Installation Procedures for Hubless Cast Iron Pipe and Fittings for Sanitary and Storm Drain Waste and Vent Piping Applications. Brace hubless cast iron pipe and fittings 5-inch and larger with HOLDRITE No Hub Pipe Restraints or approved equivalent.
B. Pipe Hangers, Guides and Channel Systems:
1. Hanger Rods: Hanger rods continuously threaded or threaded ends only in concealed spaces and threaded ends only in exposed spaces; finish electro-galvanized or cadmium- plated in concealed spaces and prime painted in exposed spaces; sizes per MSS.
2. Hanger Rod Couplings: Malleable iron rod coupling with elongated center sight gap for visual inspection; to have same finish as hanger rods.
3. Pipe Rings for Hanger Rods: Pipe sizes 2-inch and smaller, MSS SP Type 6 or Type 10, or approved equivalent. Pipe sizes 2-1/2-inches and larger, clevis type hangers with adjustable nuts on rod. MSS SP Type 1. Pipe rings to have same finish as hanger rods.
4. Pipe Slides: Type 35 reinforced Teflon slide material (3/32-inch minimum thickness) bonded to steel; highly finished steel or stainless steel contact surfaces to resists corrosion; 60-80 PSI maximum active contact surface loading; steel parts 3/16-inch minimum thickness; attachment to pipe and framing by welding.
5. Pipe Guides:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 761
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-4
a. Furnish and install pipe guides on continuous runs where pipe alignment must be maintained. Minimum two on each side of expansion joints, spaced per manufacturer's recommendations for pipe size. Fasten guides securely to pipe and structure. Any contact with chilled water pipe is not to permit heat to be transferred in sufficient quantity to cause condensation on any surface. b. Furnish and install guides approximately 4 pipe diameters (first guide) and 14 diameters (second guide) away from each end of expansion joints. Guides are not to be used as supports and are in addition to other pipe hangers and supports.
6. Channel Type Pipe Hanging System: Framing members No. 12 gauge formed steel channels, 1-5/8-inch square, conforming to ASTM A1011 GR33; one side of channel to have a continuous slot with in-turned lips; framing nut with grooves and spring 1/2-inch size, conforming to ASTM 675 GR60; screws conforming to ASTM A307; fittings conforming to ASTM A575; parts enamel painted or electro-galvanized.
C. Pipe Saddles and Shields:
1. Factory fabricated saddles or shields under piping hangers and supports for insulated piping.
2. Size saddles and shields for exact fit to mate with pipe insulation. 1/2 round, 18 gauge, minimum 12-inches in length (4-inch pipe and larger to be three times longer than pipe diameter).
D. Thermal-Hanger Shield Inserts: 100-PSI (690-kPa) minimum compressive strength insulation, encased in sheet metal shield.
1. Material for Cold Piping: Water-repellent-treated, ASTM C533, Type I calcium silicate with vapor barrier.
2. Material for Hot Piping: Water-repellent-treated, ASTM C533, Type I calcium silicate.
3. For Trapeze or Clamped System: Insert and shield cover entire circumference of pipe.
4. For Clevis or Band Hanger: Insert and shield to cover lower 180 degrees of pipe.
5. Insert Length: Extend 2-inches beyond sheet metal shield for piping operating below ambient air temperature.
6. Thermal Hanger Shield Inserts should be provided at the hanger points and guide locations on pipes requiring insulation. The Inserts should consist of Polyisocyanurate (urethane or phenolic insulation) encircling the entire circumference of the pipe with a 360 degree PVC (1.524 mm thick) with a living hinge and J lock and installed during the installation of the piping system.
E. Roller Hangers:
1. Adjustable roller hanger. Black steel yoke, cast iron roller. MSS Type 41.
F. Beam Clamps:
1. MSS Type 19 and 23, wide throat, with retaining clip.
2. Universal Side Beam Clamp: MSS Type 20.
G. Hangers for Pipe Size 2-inches and Smaller:
1. Adjustable swivel ring hanger, UL listed, Type 6 or Type 10.
H. Hangers for Pipe Size 2-1/2-inches and Larger:
1. Adjustable clevis type, UL listed, Type 1.
I. Riser Clamps:
1. Steel, UL listed. MSS Type 8.
J. Plumbers Tape:
1. Not permitted as pipe hangers or pipe straps.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 762
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-5
K. Pipe Alignment and Secondary Support Systems:
1. Secondary Pipe supports for general applications (Non-Acoustical). a. Supports will be manufactured in compliance with IAPMO Product Standard PS 42-96. All products provided will be listed by IAPMO for secondary pipe support. b. Supports may be used when sound and/or vibration transfer is not a concern.
2. Secondary pipe supports for sound and vibration attenuation (Acoustical). a. Supports will be manufactured in compliance with IAPMO Product Standard PS 42-96. All products provided will be listed by IAPMO for secondary pipe support. b. Acoustical pipe supports will be manufactured and installed in compliance with International Organization for Standardization (ISO) 3822-1 with current amendments.
c. Supports will be used when sound and/or vibration transfer is a concern. Locations where acoustical supports will be provided and include but are not limited to partition walls between living units, tenant spaces, retail units, mechanical rooms and lobbies.
d. Support Products:
1) Support to Wall Brace and Wall Stud Penetrations: HOLDRITE #261, #262, #263, and #264, or approved equivalent.
2) Pipe Wrap for Pipe Clamps and Channel-Mounted Pipe Clamps: HOLDRITE #270, or approved equivalent.
3) Pipe Wrap for Pipe Hangers: HOLDRITE #271, #272-2, and #272-4, or approved equivalent.
4) Drop-Ear Fitting Support: HOLDRITE #265, or approved equivalent. 5) Floor Riser Isolation Pads: HOLDRITE #275-T, or approved equivalent. 6) Floor Isolation Pads (General Applications): HOLDRITE #274, #275, #276, and #278, or approved equivalent.
2.3 WALL AND FLOOR SLEEVES
A. Below Grade and High Water Table Areas:
1. Modular Link Sealing System at Pipe Sleeves: Neoprene gasket links bolted together around an interior sleeve forming a watertight seal. Use a modular link sealing system at sleeves to continuously fill the annular space between the pipe and the wall opening.
Provide Link-seal Type C unless otherwise noted. OS with S-316 stainless construction for continuous water/tank walls.
2. Sleeves through concrete foundation walls and floors. Ductile iron pipe. Class 50 or 51 pipe conforming to ANSI/AWWA C151/A21.51. Pipe sleeve will extend a minimum of 6- inches beyond outside perimeter of foundation. Final placement of sleeve will be confirmed with project's structural engineer. In areas with a high water table, provide AWWA C900, Class 235 plastic pipe in lieu of ductile iron pipe.
B. Pre-Engineered Firestop Pipe Penetration Systems: UL listed assemblies for maintaining fire rating of piping penetrations through fire-rated assemblies. Comply with ASTM E814.
C. Insulating Caulking: Eagle or Pitcher Super 66 high temperature cement.
D. Fabricated Accessories:
1. Steel Pipe Sleeves: Fabricate from Schedule 40 black or galvanized steel pipe. Remove end burrs by grinding.
2. Sheet Metal Pipe Sleeves: Fabricate from G-90 galvanized sheets closed with lock-seam joints. Provide following minimum gauges for sizes indicated:
a. Sleeve Size 4-inches in Diameter and Smaller: 18 gauge. b. Sleeve Sizes 5-inches to 6-inches: 16 gauge.
c. Sleeve Sizes 7-inches and Larger: 14 gauge.
d. Fire-Rated Safing Material:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 763
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-6
1) Rockwool Insulation: Complying with FS-HH-I-558, Form A, Class IV, 6 lbs./cu.ft. density with melting point of 1985 degrees F and K value of 0.24 at 75 degrees F.
2) Calcium Silicate Insulation: Noncombustible, complying with FS-HH-I-523, Type II, suitable for 100 degrees F to 1200 degrees F service with K value of 0.40 at 150 degrees F.
2.4 BUILDING ATTACHMENTS
A. General: Anchor supports to existing masonry, block and tile walls per anchoring system manufacturer's recommendations or as modified by project Structural Engineer. Provide anchor bolts suitable for cracked concrete.
B. Anchor Bolts:
1. Anchor Bolts (Cast-In-Place): Steel bolts, ASTM A307. Nuts to conform to ASTM A194.
Design values for shear and tension not more than 80 percent of the allowable listed loads.
2. Anchor (Expansion) Bolts: Carbon steel to ASTM A307; nut to conform to ASTM A194; drilled-in type. Design values for shear and tension not more than 80 percent of the allowable listed loads.
3. Anchor (Adhesive) Bolts: Consisting of two-part adhesive cartridge and zinc-plated Type A307 steel anchor bolt rod assembly with ASTM A194 nut.
C. Beam Clamps:
1. MSS Type 19 and 23, wide throat, with retaining clip.
2. Universal Side Beam Clamp: MSS Type 20.
D. Powder-Actuated Drive Pin Fasteners:
1. Powder-Actuated Drive-Pin Fasteners: Powder actuated type, drive pin attachments with pull-out and shear capacities appropriate for supported loads and building materials where used.
E. Mechanical-Anchor Fasteners: Insert-type attachments with pull-out and shear capacities appropriate for supported loads and building materials where used.
F. Grout: ASTM C1107, Grade B, factory mixed and packaged, non-shrink and nonmetallic, dry, hydraulic-cement grout.
1. Characteristics: Post hardening and volume adjusting; recommended for both interior and exterior applications.
2. Properties: Non-staining, noncorrosive, and non-gaseous.
3. Design Mix: 5000-PSI (34.5-MPa), 28-day compressive strength.
2.5 FLASHING
A. Steel Flashing: 26 gauge galvanized steel.
B. Safes: 8 mil thick neoprene.
C. Caps: Steel, 22 gauge minimum, 16 gauge at fire-resistant structures.
D. Provide hot dipped galvanized components for items exposed to weather.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 764
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-7
2.6 MISCELLANEOUS METAL AND MATERIALS
A. Miscellaneous Metal: Provide miscellaneous metal items specified hereunder, including materials, fabrication, fastenings and accessories required for finished installation, where indicated on Drawings or otherwise not shown on drawings, that are necessary for completion of the project. The Contractor is responsible for their design.
1. Fabricate miscellaneous units to size, shapes and profiles indicated or, if not indicated, of required dimensions to receive adjacent other work to be retained by framing. Except as otherwise shown, fabricate from structural steel shapes and plates and steel bars, of welded construction using mitered joints for field connection. Cut, drill and tap units to receive hardware and similar items.
B. Structural Shapes: Where miscellaneous metal items are needed to be fabricated from structural steel shapes and plates, provide members constructed of steel conforming with requirements of ASTM A36 or approved equivalent.
C. Steel Pipe: Provide seamless steel pipe conforming to requirements of ASTM A53, Type S, Grade A, or Grade B. Weight and size required as specified.
D. Fasteners: Provide fasteners of types as required for assembly and installation of fabricated items; surface-applied fasteners are specified elsewhere.
E. Bolts: Low carbon steel externally and internally threaded fasteners conforming with requirements of ASTM A307; include necessary nuts and plain hardened washers. For structural steel elements supporting mechanical material or equipment from building structural members or connection thereto, use fasteners conforming to ASTM A325.
F. Miscellaneous Materials: Provide incidental accessory materials, tools, methods and equipment required for fabrication.
G. Provide hot dipped galvanized components for items exposed to weather.
H. Use straps, threshold rods and wire with sizes required by SMACNA to support piping.
I. Grout: ASTM C1107, Grade B, factory mixed and packaged, non-shrink and nonmetallic, dry, hydraulic-cement grout.
1. Characteristics: Post hardening and volume adjusting; recommended for both interior and exterior applications.
2. Properties: Non-staining, noncorrosive, and non-gaseous.
3. Design Mix: 5000-PSI (34.5-MPa), 28-day compressive strength.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Examination:
1. Verify building materials to have hangers and attachments affixed in accordance with hangers to be used. Provide supporting calculations.
B. Preparation:
1. Examine Drawings and coordinate for verification of exact locations of fire and smoke rated walls, partitions, floors and other assemblies. Indicate, by shading and labeling on Record Drawings such locations and label as "1-Hour Wall," "2-Hour Fire/Smoke Barrier," and the like. Determine proper locations for piping penetrations. Set sleeves in place in new floors, walls or roofs prior to concrete pour or grouting.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 765
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-8
C. Install hangers, supports, anchors and sleeves after required building structural work has been completed in areas where the work is to be installed. Coordinate with project structural engineer proper placement of inserts, anchors and other building structural attachments.
3.2 PIPE HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT A. Hangers and Supports:
1. Comply with MSS SP-58. Pipe Hanger and Support Installation: Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.
For horizontally hung grooved-end piping, provide a minimum of 2 hangers per pipe section.
2. Pipe Ring Diameters:
a. Uninsulated and Insulated Pipe, except where oversized pipe rings are specified:
Ring inner diameter to suit pipe outer diameter.
b. Insulated Piping Where Oversized Pipe Rings are Specified and Vibration Isolating Sleeves: Ring inner diameter to suit outer diameter of insulation or sleeve.
3. Oversize Pipe Rings: Provide oversize pipe rings of 2-inch and larger size.
4. Pipe Support Brackets: Support pipe with pipe slides.
5. Steel Backing in Walls: Provide steel backing in walls to support fixtures and piping hung from steel stud walls.
6. Channel Support System Installation: Arrange for grouping of parallel runs of piping and support together on field-assembled channel systems.
a. Field assemble and install according to manufacturer's written instructions.
7. Pipe Guides:
a. Install on continuous runs where pipe alignment must be maintained. Provide a minimum of two on each side of expansion joints, spaced per manufacturer's recommendations for pipe size. Fasten guides to pipe structure. Any contact with chilled water pipe should not permit heat to be transferred in sufficient quantity to cause condensation on any surface.
b. Install approximately 4 pipe diameters (first guide) and 14 diameters (second guide) away from each end of expansion joints. Do not use as supports. Provide in addition to other required pipe hangers and supports.
8. Heavy-Duty Steel Trapeze Installation: Arrange for grouping of parallel runs of horizontal piping and support together on field -fabricated, heavy-duty trapezes. a. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified above for individual pipe hangers.
b. Field fabricate from ASTM A 36/A 36M, steel shapes selected for loads being supported. Weld steel according to AWS D-1.1
9. Group parallel runs of horizontal piping to be supported together on trapeze-type hangers.
10. Where piping of various sizes is to be supported together by trapeze hangers, space hangers for smallest pipe size or install intermediate supports for smaller diameter pipe.
11. Do not support piping from other piping.
12. Fire protection piping will be supported independently of other piping.
13. Prevent electrolysis in support of copper tubing by use of hangers and supports which are copper plated.
14. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers and other accessories.
15. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchor, and to facilitate the action of expansion joints, expansion loops, expansion bends and similar units.
16. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 766
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-9
17. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so maximum pipe deflections allowed by ASME B31.9, "Building Services Piping" is not exceeded.
18. Insulated Piping: (comply with the following)
a. Attach clamps and spacers to piping.
1) Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
2) Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
3) Do not exceed pipe stress limits according to ASME B31.9. b. Install MSS SP-58, Type 39 protection saddles, if insulation without a vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation. 1) Option: Thermal-hanger shield inserts may be used. Include steel weight- distribution plate for pipe NPS 4 (DN100) and larger if pipe is installed on rollers.
c. Install MSS SP-58, Type 40 protective shields on cold piping having a vapor barrier. Shields to span arc of 180 degrees.
1) Option: Thermal-hanger shield inserts may be used. Include steel weight- distribution plate for pipe NPS 4 (DN100) and larger if pipe is installed on rollers.
d. Shield Dimensions for Pipe, not less than the following:
1) NPS 1/4 to NPS 3-1/2 (DN8 to DN 90): 12-inches long and 0.048-inch thick. 2) NPS 4 (DN100): 12-inches long and 0.06-inch thick.
3) NPS 5 and NPS 6 (DN125 and DN150): 18-inches long and 0.06-inch thick. 4) NPS 8 to NPS 14 (DN200 to DN350): 24-inches long and 0.075-inch thick. 5) NPS 16 to NPS 24 (DN400 to DN600): 24-inches long and 0.105-inch thick. e. Pipes NPS 8 (DN200) and Larger: Include wood inserts. f. Insert Material: Length at least as long as protective shield. g. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
19. Equipment Clearances: Do not route equipment or piping through electrical rooms, transformer vaults, elevator equipment rooms, IT rooms, MPOE rooms, or other electrical or electronic equipment spaces and enclosures and the like. Within equipment rooms, provide minimum 3-feet lateral clearance from all sides of electric switchgear panels. Do not route piping or equipment above any electric power or lighting panel, switchgear, or similar electric device. Coordinate with Electrical and coordinate exact equipment or pipe routing to provide proper clearance with such items.
20. Pipe supports and hanger spacing (pipe supported from structure or floor-supported) to meet the requirements of References and Standards Article in Part 1 above.
B. Pipe Curb Assemblies:
1. Provide for piping and electrical conduit which penetrates the structural roof deck to service equipment above the roof level (e.g., piping, electrical power and control wiring).
Meet requirements of roof warranty.
2. Provide prefabricated units for roof membrane and insulation penetrations related to equipment. Coordinate with roofing system. Set supports on the structural deck. Do not set supports on insulation or roofing. Provide level supports by prefabricated pitch built into the curb.
3. Piping above roof to be supported with freestanding roof pipe supports unless detailed otherwise. At roofing applications, the adhesion mastic is to be specifically submitted to and approved by the roofing system manufacturer/installer to maintain the integrity of all warranties.
4. At concrete floors, install a polyurethane mastic to the support block and adhere in place.
C. Vertical Piping:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 767
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-10
1. Support with U-clamps fastened to wall to hold piping away from wall unless otherwise approved.
2. Riser clamps to be directly under fitting or welded to pipe. Provide neoprene pads for all systems except natural gas.
3. Riser to be supported at each floor penetration.
4. Provide structural steel supports at the base of pipe risers. Size supports to carry forces exerted by piping system when in operation.
D. Adjusting and Painting:
1. Adjust hangers so as to distribute loads equally on attachments. Provide grout under supports to bring piping and equipment to proper level and elevations.
2. Prime paint ferrous nongalvanized hangers, accessories, and supplementary steel which are not factory painted.
3.3 WALL AND FLOOR SLEEVES
A. Modular Link Sealing System Pipe Sleeves: Install at slab on grade floor/below grade piping penetrations. Provide manufacturer's sleeve appropriate to seal type for pre-cast penetrations (except for DWV piping at slab on grade). Provide manufacturer's sleeve appropriate to seal type for pre-cast penetrations.
B. Fabricated Pipe Sleeves:
1. Provide either steel or sheet metal pipe sleeves accurately centered around pipe routes.
Size such that piping and insulation, if any, will have free movement within the sleeve, including allowance for thermal expansion. Sleeve diameter to be determined by local seismic clearance requirement, and by waterproofing requirements.
2. Length: Equal to thickness of construction penetrated, except extend floor sleeves 1-inch above floor finish.
3. Provide temporary support of sleeves during placement in concrete and other work around sleeves. Provide temporary end closures to prevent concrete and other materials from entering pipe sleeves.
4. Seal each end airtight with a resilient nonhardening sealer, UL listed and fire rated per ASTM 814.
3.4 BUILDING ATTACHMENTS
A. Install within concrete slabs or attach to structural steel or wood. Install additional building attachments where support is required for additional concentrated loads, including valves, flanges, guides, strainers, expansion joints and at changes in direction of piping.
B. Attachment to Wood Structure: Provide MSS Type 34 for attachment to wooden beam or approved attachment for a wood structure.
C. Install mechanical-anchor fasteners in concrete after concrete is placed and completely cured.
Install fasteners according to manufacturer's written instructions.
D. Install concrete inserts before concrete is placed; fasten insert secure to forms. Where concrete with compressive strength less than 2500 PSI is indicated, install reinforcing bars through openings at top in inserts.
E. Install powder-actuated drive pin fasteners in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual. Test powder-actuated insert attachments with a minimum load of 100 pounds.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 768
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-11
F. Bolting: Provide bored, drilled or reamed holes for bolting to miscellaneous structural metals, frames or for mounts or supports. Flame cut, punched or hand sawn holes will not be accepted.
G. Anchor Bolts:
1. Install anchor bolts for mechanical equipment and piping as required. Tightly fit and clamp base-supported equipment anchor bolts at equipment support points. Provide locknuts where equipment and piping are hung.
2. Anchor Bolts (Cast-In-Place): Embed anchor bolts in new cast-in-place concrete to anchor equipment. Install a pipe sleeve around the anchor bolt for adjustment of the top 1/3 of the bolt embedment; sizes and patterns to suit the installation conditions of the equipment to be anchored.
H. Pipe Anchors: Provide anchors to fasten piping which is subject to expansion and contraction, and adjacent to equipment to prevent loading high forces onto the equipment.
I. Escutcheon Plates: Install around horizontal and vertical piping at visible penetrations through walls, partitions, floors, or ceilings, including penetrations through closets, through below ceiling corridor wall, and through equipment room walls and floors.
J. Installation of metallic or plastic piping penetrations through non fire-rated walls and partitions and through smoke-rated walls and partitions:
1. Install fabricated pipe sleeve.
2. After installation of sleeve and piping, tightly pack entire annular void between piping or piping insulation and sleeve identification with specified material.
3. Seal each end airtight with a resilient nonhardening UL listed fire resistant ASTM 814 sealant.
K. Piping Penetrations Through Fire-Rated (1 to 3 hour) Assemblies:
1. Select and install pre-engineered pipe penetration system in accordance with the UL listing and manufacturer's recommendation.
2. Provide proper sizing when providing sleeves or core-drilled holes to accommodate the penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet the requirements of ASTM E814. Use HOLDRITE HydroFlame or approved equivalent.
L. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers and other accessories.
3.5 FLASHING
A. Flash and counter flash where piping passes through weather or waterproofed walls, floors and roofs.
B. Flash vent soil pipes with flashings per Division 01, General Requirements.
C. Flash floor drains over finished areas and roof drains, 10-inches clear on sides, minimum 36- inches by 36-inches sheet size. See Division 01, General Requirements. Fasten flashing to drain with clamping device.
D. Install built up fixtures (mop sinks, shower stalls, shower floors) with water sealing systems/membranes to meet Code and as prescribed by Division 01, General Requirements and Section 22 00 00, Plumbing Basic Requirements. Meet all Code testing requirements.
Provide drainage devices with appropriate flanges, clamps, etc. to meet these installation requirements and ensure a water-tight installation.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 769
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-12
3.6 MISCELLANEOUS METAL AND MATERIALS
A. Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions and directions for installation of anchorages, such as concrete inserts, sleeves, anchor bolts and miscellaneous items having integral anchors, which are to be embedded in concrete or masonry construction. Coordinate delivery of such items to project site.
B. Fastening to In-Place Construction: Provide anchorage devices and fasteners where necessary for securing miscellaneous metal fabrications to in-place construction; including, threaded fasteners for concrete and masonry inserts, toggle bolts, through-bolts, lag bolts, wood screws and other connectors as required. Avoid cutting concrete reinforcing when drilling for inserts.
Reference structural drawings and reinforcing shop drawings and determine locations of stirrups prior to drilling into concrete.
C. Cutting, Fitting and Placement: Perform cutting, drilling and fitting required for installation of miscellaneous metal fabrications. Set work accurately in location, alignment and elevation, plumb, level, true and free of rack, measured from established lines and levels. Provide temporary bracing or anchors in formwork for items which are to be built into concrete masonry or similar construction.
D. Field Welding: Comply with AWS Code for procedures of manual shielded metal-arc welding, appearance and quality of welds made, and methods used in correcting welding work.
E. Setting Loose Plates: Clean concrete and masonry bearing surfaces of any bond reducing materials, and roughen to improve bond to surfaces. Clean bottom surface of bearing plates.
1. Set loose leveling and bearing plates on wedges or other adjustable devices. After the bearing members have been positioned and plumbed, tighten the anchor bolts. Do not remove wedges or shims, but if protruding, cut-off flush with edge of the bearing plate before packing with grout. Use metallic non-shrink grout in concealed locations where not exposed to moisture; use non-metallic non-shrink grout in exposed locations, unless otherwise indicated.
2. Pack grout solidly between bearing surfaces and plates to ensure that no voids remain.
F. Fabrication:
1. General: Verify dimensions prior to fabrication. Form metal items to accurate sizes and configurations as indicated on Drawings and otherwise required for proper installation; make with lines straight and angles sharp, clean and true; drill, countersink, tap, and otherwise prepare items for connections with work of other trades, as required. Fabricate to detail of structural shapes, plates and bars; weld joints where practicable; provide bolts and other connection devices required. Include anchorages; clip angles, sleeves, anchor plates and similar devices. Hot dip galvanize after fabrication items installed in exterior locations. Set accurately in position as required and anchor securely to building construction. Construct items with joints formed for strength and rigidity, accurately machining for proper fit; where exposed to weather, form to exclude water.
2. Finishes:
a. Ferrous Metal: After fabrication, but before erection, clean surfaces by mechanical or chemical methods to remove rust, scale, oil, corrosion, or other substances detrimental to bonding of subsequently applied protective coatings. For metal items exposed to weather or moisture, galvanize in manner to obtain G90 zinc coating in accordance with ASTM A123. Provide other non-galvanized ferrous metal with 1 coat of approved rust-resisting paint primer, in manner to obtain not less than 1.0 mil dry film thickness. Touch-up damaged areas with primer of same material before installation. Apply zinc coatings and paint primers uniformly and smoothly; leave ready for finish painting as specified elsewhere. b. Metal in contact with Concrete, Masonry and Other Dissimilar Materials:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 770
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT 22 05 29-13
1) Where metal items are to be erected in contact with dissimilar materials, provide contact surfaces with coating of an approved zinc-chromate primer in manner to obtain not less than 1.0 mil dry film thickness, in addition to other coatings specified in these specifications.
c. For Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and apply galvanizing repair paint to comply with ASTM A780.
G. Metal Fabrication:
1. Cut, drill, and fit miscellaneous metal fabrications for heavy-duty steel trapezes and equipment supports.
2. Fit exposed connections together to form hairline joints. Field-weld connections that cannot be shop-welded because of shipping size limitations.
3. Field Welding: Comply with AWS D1.1 procedures for shielded metal arc welding, appearance and quality of weld and methods used in correcting welding work, and with the following:
a. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
b. Obtain fusion without undercut or overlap.
c. Remove welding flux immediately.
d. Finish welds at exposed connections so no roughness shows after finishing and contours of welded surfaces match adjacent contours.
4. Provide hot dipped galvanized components for items exposed to weather.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 771
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT 22 05 53-1
SECTION 22 05 53
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Plastic Nameplates
2. Tags
3. Plastic Pipe Markers
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, submit Valve Schedule for each piping system, in tabular format using Microsoft Word or Excel software. Tabulate valve number, piping system, system abbreviation (as shown on tag), location of valve (room or space), and variations for identification (if any). Mark valves which are intended for emergency shutoff and similar special uses by special "flags" in margin of schedule. In addition to mounted copies, furnish extra copies for maintenance manuals.
Provide schedules organized as follows:
1. Equipment Type:
a. Identification:
b. Background:
1) Size:
2) Color:
c. Lettering:
1) Size:
2) Color:
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Manufacturer's Qualifications: Firms regularly engaged in manufacture of identification devices of types and sizes required.
2. Codes and Standards: Comply with ANSI A13.1 for lettering size, length of color field, colors, and viewing angles of identification devices unless otherwise indicated.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 772
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT 22 05 53-2
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. General: Manufacturer's standard products of categories and types required for each application as referenced in other Division 22, Plumbing Sections. Where more than a single type is specified for application, provide single selection for each product category.
B. Plastic Nameplates:
1. Brady Corporation
2. Or approved equivalent.
C. Tags:
1. Brady Corporation
2. Brimar
3. Champion America Inc.
4. Craftmark
5. Seton Identification Products
6. Or approved equivalent.
D. Plastic Pipe Markers:
1. Brady Corporation
2. Brimar
3. Champion America Inc.
4. Craftmark
5. Seton Identification Products
6. Or approved equivalent.
2.2 PLASTIC NAMEPLATES
A. Description: Engraving stock melamine plastic laminate 1/8-inch thick, engraved with engraver's standard letter style of the sizes and wording indicated.
1. Letter Color: White.
2. Letter Height: 1/2 inch.
3. Background Color: Black.
4. Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive where screws cannot or should not penetrate the substrate.
5. Access Panel Markers: Manufacturer's standard 1/16-inch thick engraved plastic laminate access panel markers, with abbreviations and numbers corresponding to concealed valve or devices/equipment. Include center hole to allow attachment.
6. Signage for hot water outlets on 140 degree F hot water systems not protected by ASSE 1070 mixing valves; hose bibbs, janitor sinks, and fixtures used by trained personnel. a. Manufacturer's standard 1/8-inch thick engraved plastic laminate signage 4 by 4- inches.
b. Letter Color: Red.
c. Letter Height: 1/2 inch.
d. Background Color: White.
e. Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive where screws cannot or should not penetrate the substrate.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 773
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT 22 05 53-3
2.3 TAGS
A. Plastic Tags: Laminated three-layer plastic with engraved black letters on light contrasting background color. Tag size minimum 1-1/2-inch diameter.
B. Metal Tags: Polished Brass with stamped letters; tag size minimum 1-1/2-inch diameter with smooth edges.
C. Valve designations to be coordinated with existing valve identifications to ensure no repetitive designations are utilized.
D. Chart/Schedules: Valve Schedule Frames. For each page of a valve schedule, provide glazed display frame with removable mounting as appropriate for wall construction upon which frame is to be mounted. Provide frames of finished hardwood or extruded aluminum, with SSB-grade sheet glass.
E. Valve Tag Fasteners: Solid brass chain (wire link or beaded type), or solid brass S-hooks.
F. Warning Tags: Preprinted or partially preprinted, accident-prevention tags; of plasticized card stock with matte finish suitable for writing.
1. Size: Approximately 4- by 7-inches.
2. Fasteners: Brass grommet and wire.
3. Nomenclature: Large-size primary caption such as DANGER, CAUTION, or DO NOT OPERATE.
4. Color: Yellow background with black lettering.
2.4 PLASTIC PIPE MARKERS
A. Color: Conform to ASME A13.1 and ANSI Z535.1.
B. Plastic Pipe Markers (for external diameters of 6-inches and larger including insulation): Factory fabricated, flexible, semi-rigid plastic, preformed to fit around pipe or pipe covering; minimum information indicating flow direction arrow and identification of fluid being conveyed.
C. Plastic Tape Pipe Markers (for external diameters less than 6-inches including insulation):
Flexible, vinyl film tape with pressure sensitive adhesive backing and printed markings.
Minimum information indicating flow direction arrow and identification of fluid being conveyed.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Lettering and Graphics:
1. General: Coordinate names, abbreviations and other designations used in plumbing identification work with corresponding designations shown, specified or scheduled.
Provide numbers, lettering and wording as indicated or, if not otherwise indicated, as recommended by manufacturers or as required for proper identification and operation/maintenance of mechanical systems and equipment.
2. Multiple Systems: Where multiple systems of same generic name are shown and specified, provide identification which indicates individual system number as well as service (as examples: Chiller No. 3, Air Handling Unit No. 42, Standpipe F12, and the like).
B. Preparation: Degrease and clean surfaces to receive adhesive for identification materials.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 774
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT 22 05 53-4
C. Coordination: Where identification is to be applied to surfaces which require insulation, painting or other covering or finish, including valve tags in finished mechanical spaces, install identification after completion of covering and painting. Install identification prior to installation of acoustical ceilings and similar removable concealment.
D. Install valve schedule at each mechanical room.
E. Access Doors: Provide markers on each access door and housings, indicating purpose of access (to what equipment) and other maintenance and operating instructions.
3.2 PLASTIC NAMEPLATES
A. Identify pumps, heat transfer equipment, tanks, and water treatment devices with plastic nameplates riveted to equipment body.
B. Identify control panels and major control components outside panels with plastic nameplates riveted to equipment body.
C. Install plastic nameplates with corrosive-resistant mechanical fasteners.
3.3 TAGS
A. Small devices, such as in-line pumps, may be identified with tags. Use metal tags on piping 3/4- inch diameter and smaller.
B. Identify valves in main and branch piping with metal tags. Indicate valve function and the normally open or closed positions on the valve tag.
C. Coordinate with the facility maintenance personnel to ensure consistency with the existing tagging system.
D. Tag balancing valves with balanced GPM or CFM indicated after balancing is completed and accepted.
E. Install tags with corrosion resistant chain.
3.4 PLASTIC PIPE MARKERS
A. Install plastic pipe markers in accordance with manufacturer's instructions.
B. Install plastic tape pipe markers complete around pipe in accordance with manufacturer's instructions.
C. For exterior underground piping installations, install underground plastic pipe markers with tracer wire 6- to 8-inches below finished grade directly above buried pipe.
D. Identify piping, concealed or exposed, with plastic tape pipe markers. Identify service, flow direction, and pressure. Install in clear view and align with axis of piping. Locate identification not to exceed 20-feet (reduced to 10-feet in congested areas and mechanical equipment rooms) on straight runs including risers and drops, adjacent to each valve and tee, at each side of penetration of structure or enclosure, and at each obstruction. Locate near branches, valves, control devices, equipment connections, access doors, floor/wall penetrations.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 775
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING INSULATION 22 07 00-1
SECTION 22 07 00
PLUMBING INSULATION
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Type 1, Glass Wool Pipe Insulation
2. Type 7, ADA Accessible Lavatory/Sink Insulation Kit
3. Accessories
4. Pipe Fitting Insulation Covers
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Piping insulation products to contain less than 0.1 percent by weight PBDE in all insulating materials.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Installer qualifications.
2. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any) for each type of product indicated.
3. Material Test Reports: From a qualified testing agency acceptable to authorities having jurisdiction indicating, interpreting, and certifying test results for compliance of insulation materials, sealers, attachments, cements, and jackets with requirements indicated.
Include dates of tests.
4. Installer Certificates: Signed by the Contractor certifying that installers comply with requirements.
5. Submit manufacturer's installation instructions.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements apply to this Section.
B. In addition, meet the following:
1. Formaldehyde Free: Should be third-party certified with UL Environment Validation.
2. Recycled Content: A minimum of 40 percent post-consumer recycled glass content certified and UL validated.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 776
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING INSULATION 22 07 00-2
3. Low Emitting Materials: For all thermal and acoustical applications of Glass Mineral Wool Insulation products, provide materials complying with the testing and products requirements of UL GREENGUARD Gold Certification.
4. Installer to have minimum 5 years' experience in the business of installing insulation.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.7 FIRE HAZARD CLASSIFICATION
A. Maximum fire hazard classification of the composite insulation construction as installed to be not more than a Flame Spread Index (FSI) of 25 and Smoke Developed Index (SDI) of 50 as tested by current edition of ASTM E84 (NFPA 255) method.
B. Test pipe insulation in accordance with requirements of current edition of UL "Pipe and Equipment Coverings."
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Type 1, Glass Wool Pipe Insulation:
1. Johns Manville
2. Knauf
3. Owens-Corning
4. Or approved equivalent.
B. Type 7, ADA Accessible Lavatory/Sink Insulation Kit:
1. IPS/Truebro
2. McGuire/Pro-Wrap
3. Plumberex/Pro-Extreme
4. Brocar Trap Wrap
5. Or approved equivalent.
C. Accessories:
1. ITW Insulation Systems
2. Or approved equivalent.
D. Pipe Fitting Insulation Covers:
1. Zeston Johns Manville
2. ITW Insulation Systems
3. Or approved equivalent.
2.2 TYPE 1, GLASS WOOL PIPE INSULATION
A. Glass Fiber: ASTM C547 Type I and IV; rigid molded, noncombustible.
1. Thermal Conductivity Value: 0.27 BTU*in/(hr*sf*F) at 75 degrees F.
2. Maximum Service Temperature: 850 degrees F to 1000 degrees F.
3. Vapor Retarder Jacket: White Kraft paper reinforced with glass fiber and bonded to aluminum foil, with self-sealing longitudinal laps and butt strips or vapor barrier mastic.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 777
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING INSULATION 22 07 00-3
2.3 TYPE 7, ADA ACCESSIBLE LAVATORY/SINK INSULATION KIT A. P-traps, trap arms, tail pieces, hot water and cold water insulating guards meeting ASTM C1822. Molded closed cell insulation with vinyl cover and nylon fasteners, paintable. Provide accessories as required for complete installation covering all exposed waste piping, water piping, stops and supplies. Color white.
2.4 ACCESSORIES
A. Equipment Insulation Compounds: Provide adhesives, cement, sealers, mastics and protective finishes as recommended by insulation manufacturer for applications indicated.
B. Provide staples, bands, wire, wire netting, tape corner angles, anchors, stud pins and metal covers as recommended by insulation manufacturer for applications indicated. Accessories, i.e., adhesives, mastics, cements and tape to have same flame and smoke component ratings as insulation materials with which they are used. Shipping cartons to bear a label indicating that flame and smoke ratings do not exceed those listed above. Provide permanent treatment of jackets or facings to impart flame and smoke safety. Provide non-water soluble treatments.
Provide UV protection recommended by manufacturer for outdoor installation.
2.5 PIPE FITTING INSULATION COVERS
A. PVC Plastic Fitting Covers: Schuller Zeston 2000, Knauf Proto Fitting or approved equivalent.
One-piece molded type fitting covers and jacketing material, gloss white. Connections: Tacks; pressure sensitive color matching vinyl tape.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION INFORMATION
A. Verification of Conditions:
1. Do not apply insulation until pressure testing and inspection of piping has been completed.
2. Examine areas and conditions under which insulation will be installed. Do not proceed with work until unsatisfactory conditions have been corrected.
B. Preparation: Clean and dry surfaces to be insulated.
C. Installation:
1. Insulation: Continuous through walls, floors, and partitions except where noted otherwise.
2. Piping and Equipment:
a. Install insulation over clean, dry surfaces with adjoining sections firmly butted together and covering surfaces. Fill voids and holes. Seal raw edges. Install insulation in a manner such that insulation may be split, removed, and reinstalled with vapor barrier tape on strainer caps and unions. Do not install insulation until piping has been leak tested and has passed such tests. Do not insulate manholes, equipment manufacturer's nameplates, handholes, and ASME stamps. Provide beveled edge at such insulation interruptions. Repair voids or tears.
D. Provide accessories as required. See Part 2 Article "Accessories" above.
E. Protection and Replacement: Protect installed insulation during construction. Replace damaged insulation which cannot be repaired satisfactorily, including units with vapor barrier damage and moisture saturated units.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 778
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING INSULATION 22 07 00-4
F. Labeling and Marking: Provide labels, arrows and color coding on piping. Attach labels and flow direction arrows to jacketing per Section 22 05 53, Identification for Plumbing Piping and Equipment.
G. Insulation Shields: Provide hangers and shields (18 gauge minimum) outside of insulation for cold piping (<60 degrees F). Hot water piping hangers may penetrate insulation to contact pipe directly. Provide 18-inch long, noncompressible insulation section at insulation shields for lines 1-1/2-inches and larger (hot and cold piping).
H. Piping Surfaces to be Insulated:
Item to be Insulated
System
Insulation
Type
Pipe Size
Insulation
Thickness
Hot Water Piping Above
Grade
(105F to 140F)
1 <1-inch
=>1-inch
1-inch
1-1/2-inch
Hot Water Piping Above
Grade
(141F to 200F)
1 <1-1/2-inch
=>1-1/2-inch
1-1/2-inch
2-inch
Cold Water Piping Above
Grade
1 =<1-1/2-inch
>1-1/2-inch
1/2-inch
1-inch
ADA Accessible
Lavatory/Sink
7 All As Listed
3.2 TYPE 1, GLASS WOOL PIPE INSULATION
A. See General Installation Requirements above.
B. Install in accordance with manufacturer's instructions for below grade installation.
C. Lap seal insulation with waterproof adhesive. Do not use staples or other methods of attachment which would penetrate vapor barrier. Apply fitting covers with seated tacks and vapor barrier tape.
D. Apply insulation to pipe and seal with self-sealing lap. Use self-sealing butt strips to seal butt joints. Insulate fittings, valves and unions with single or multiple layers of insulation and cover to match pipe or use preformed PVC molded insulation covers.
3.3 TYPE 7, ADA ACCESSIBLE LAVATORY/SINK INSULATION KIT A. See General Installation Requirements above.
B. Install in accordance with manufacturer's instructions.
C. Provide lavatory/sink insulation kit. Install on waste fittings, hot and cold water stops and supplies.
3.4 ACCESSORIES
A. See General Installation Requirements above.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 779
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING INSULATION 22 07 00-5
B. Install in accordance with manufacturer's instructions.
C. Furnish and install accessories for all insulation types listed in this Section.
3.5 PIPE FITTING INSULATION COVERS
A. See General Installation Requirements above.
B. Install in accordance with manufacturer's instructions.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 780
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-1
SECTION 22 10 00
PLUMBING PIPING
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Sanitary, Drainage DWV Piping, Above Grade
2. Pump Waste Pressure Piping (Pumped Discharge)
3. Hot and Cold Domestic Water Above Grade
4. Piping Specialties
5. Cleanouts
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. NSF 61, Annex G.
2. California Standard AB 1953.
3. Steel pipe to conform to ASTM and ANSI Standards as specified in this Section.
4. Copper piping to conform to ASTM B88, B306 and B208 and the standards of Copper Development Association (CDA), and American Welding Society, (AWS).
5. Cast Iron Piping to conform to standards of ASTM A-74, CISPI 301 and FM 1680.
6. Manufacturer's Standards Society (MSS) for valving and support reference standard.
7. American Water Works Association (AWWA) for Valving Assembly Standards.
8. American Society of Sanitation Engineers (ASSE) for Valving Standards.
9. American National Standards Institute (ANSI) for Piping Standards.
10. NFPA Standard 51B - “Fire Prevention in Use of Cutting and Welding Processes.”
11. Crosslinked polyethylene (PEX) pipe conforming to ASTM F876, F877 and CSA B1375, or DIN 16892 and 16893.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 781
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. See component manufacturers listed in individual articles below.
B. ADS
C. American-USA
D. Cerro
E. Charlotte
F. Elkhart
G. Enfield
H. Ideal
I. Mifab
J. Mission
K. Mueller
L. Nibco
M. Sioux Chief
N. Tyler
O. Zurn
P. Or approved equivalent.
Q. Cleanouts:
1. J.R. Smith
2. Mifab
3. Sioux Chief
4. Wade
5. Watts
6. Zurn
7. Or approved equivalent.
R. Firestopping Penetrations in Fire Rated Wall Floor Assemblies:
1. Hilti
2. Proset
3. Or approved equivalent.
2.2 GENERAL
A. Provide pipe, tube, and fittings of the same type, fitting requirements, grade, class, and the size and weight indicated or required for each service, as indicated in other Division 22, Plumbing Specifications. Where type, grade, or class is not indicated, provide proper selection as October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 782
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-3
determined by installer for installation requirements, and comply with governing regulations and industry standards.
B. Manufactured materials delivered, new to the project site and stored in their original containers.
C. Product Marking: Furnish each item with legible markings indicating name brand and manufacturer, manufacturing process, heat number and markings as required per ASTM and UL/FM Standards.
2.3 SANITARY, DRAINAGE DWV PIPING, ABOVE GRADE
A. Cast Iron Pipe: ASTM A888/CISPI 301 hubless.
1. Fittings: Cast iron.
2. Coupling Assembly:
a. Heavy Duty: ASTM C1540, Clamp-All Hi-Torq 125, Husky SD 4000, Mifab QXHUB, Mission HeavyWeight couplings.
B. Copper Tube: ASTM B 306, DWV.
1. Fittings: ASME B16.29, wrought copper.
2. Joints: ASTM B32, alloy Sn50 solder.
2.4 PUMP WASTE PRESSURE PIPING (PUMPED DISCHARGE)
A. Above Grade: Type "L" copper with solder joints.
2.5 HOT AND COLD DOMESTIC WATER ABOVE GRADE
A. Copper Tube: 2-1/2-inches and smaller. ASTM B88 (ASTM B88M), Type L (B), Drawn.
1. Fittings: ASME B16.18 copper.
2. Joints: ASTM B32, alloy Sn95 solder.
2.6 PIPING SPECIALTIES
A. Pipe Escutcheons:
1. Provide pipe escutcheons as specified with inside diameter closely fitting pipe outside diameter, or outside of pipe insulation where pipe is insulated. Select outside diameter of escutcheon to completely cover pipe penetration hole in floors, walls, or ceilings; and pipe sleeve extension, if any. Furnish pipe escutcheons with nickel or chrome finish for occupied areas, prime zinc base paint finish for unoccupied areas.
2. Pipe Escutcheons for Moist Areas: For waterproof floors, and areas where water and condensation can be expected to accumulate, provide stainless steel, cast brass or sheet brass escutcheons, solid or split hinged.
3. Pipe Escutcheons for Dry Areas: Provide stainless steel escutcheons, solid or split hinged.
B. Low Pressure Y-Type Pipeline Strainers:
1. Provide strainers full line size of connecting piping, with ends matching piping system materials. Select strainers for 125 percent of the working pressure of piping system with Type 304 stainless steel screens made with 1/16-inch perforations on 4-inch and smaller strainers, and 1/8-inch perforations on 6-inch and larger strainers.
2. Threaded Ends, 2-inch and Smaller: Cast-iron body, screwed screen retainer with centered blowdown fitted with plus.
3. Flanged Ends, 2-1/2-inch and Larger: Cast-iron body, bolted screen retainer with off- center blowdown fitted with hose bibb.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 783
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-4
C. Dielectric Waterways:
1. Provide standard products recommended by manufacturers in service indicated, which effectively isolate ferrous from non-ferrous piping (eliminating electrical conductance) to prevent galvanic action and stop corrosion.
2. Provide dielectric waterways or brass nipple fitting for transitions between dissimilar metal piping.
D. Unions:
1. Unions to comply with the following schedule:
a. Soldered Copper or Brass Pipe, 2-inch and smaller: 150 PSI cast bronzed or copper, ground joint, non-ferrous seat with soldered ends. b. Screwed Copper or Brass Pipe, 2-inch and smaller: 150 PSI cast brass, ground joint, brass to brass seat, threaded ends.
2.7 CLEANOUTS
A. Locate cleanouts as shown on Drawings and as required by local code. Cleanouts same size as pipe except that greater than 4-inches will not be required. Plastic components not allowed, except unless specifically noted.
B. Types:
1. Tile Floor Cleanouts: J. R. Smith 4020 with round heavy-duty nickel bronze top, taper thread, ABS plug and standard screws.
2. Wall Cleanout: J. R. Smith 4472-U, countersunk bronze taper thread plug, stainless steel shallow cover and vandalproof screws.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. General Installation:
1. Work performed by experienced journeyman plumbers. No exceptions.
2. Provide access panels for concealed valves, shock arrestors, trap primers and the like.
3. Install pipes and pipe fittings in accordance with recognized industry practices and manufacturer's recommendations.
4. Align piping accurately at connections, within 3/32-inch misalignment tolerance. Comply with ANSI B31 Code for Pressure Piping.
5. Locate piping runs, as indicated, vertically and horizontally (pitched to drain) and avoid diagonal runs wherever possible. Orient horizontal runs parallel with walls and column lines. Locate runs as shown or described by diagrams, details, and notations or, if not otherwise indicated, run piping in shortest route which does not obstruct space or block access for servicing building and its equipment. Hold piping close to walls, overhead construction, and other structural and permanent-enclosure elements of building. Limit clearance to 1/2-inch where furring is shown for enclosure or concealment of piping, but allow for insulation thickness, if any. Where possible, locate insulated piping for 1-inch clearance outside insulation. Whenever possible in finished and occupied spaces, conceal piping from view by locating it in column enclosures, hollow wall construction or above suspended ceilings. Do not encase horizontal runs in solid partitions, except as indicated.
a. Do not run piping through transformer vaults, telephone, elevator, electrical or electronic equipment spaces or enclosures unless indicated on Drawings. b. Concealed Piping Above Suspended Ceiling: Plan and coordinate to avoid interferences; install to maintain suspended ceiling heights shown on Architectural Drawings. Allow sufficient space above removable ceiling panels for panel removal. Locate piping so that valves are visible and accessible within 24-inches October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 784
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-5
horizontally and vertically from point of access to the ceiling space. Provide plenum rated materials for ceiling spaces which are being used as plenums. c. Exposed Work: Run pipes parallel to the closest wall unless otherwise shown on Drawings; maintain maximum headroom; avoid light fixtures. d. Insulation Space Allowance: In piping work, allow space for pipe insulation and jackets. If interferences occur, move the piping to accommodate insulation thickness specified.
e. Pipe Lengths: Do not use short lengths or nipples at locations where a full length of pipe will fit.
f. Alignment Prior to Supporting and Anchoring: Place piping in proper alignment and position prior to connection to anchors, expansion loops, and equipment. Furnish jacking devices, temporary steel structural members, and assembled structures as necessary. Remove temporary equipment and structures supplied by contractor at completion; such items to remain Contractor property.
g. Valve and Equipment Connections: Piping not to place undue stress on flanged valves and equipment connections. Install mating flange faces true and parallel to each other and not requiring springing of piping for assembly. Pipe hangers and supports to carry the full weight of the pipe and fluid. h. Piping Leaks: Correct immediately; use new materials; leak-sealing compounds or peening not permitted.
i. Pressure Ratings of Fittings, Valves, and Devices in Piping Systems: Pressure rating to be equal to, or greater than, the maximum working pressure of the system.
j. Equipment Vents and Drains: Provide for coils and vessels which contain water.
Provide isolation valves and outlet valves at piping high and low points to permit venting and draining of the vessel without venting and draining connected piping.
Provide hose connections and caps on drain lines.
k. Escutcheon Plates: Where exposed insulated and uninsulated piping passes through walls, floors or ceilings; provide spring clip type. Provide plates on both sides of wall or floor.
B. Testing:
1. General:
a. Provide temporary equipment for testing, including pumps, compressors, tanks, and gauges, as required. Test piping systems before insulation (if any) is installed and remove or disengage control devices before testing. Where necessary, test sections of each piping system independently, but do not use piping valves to isolate sections where test pressures exceed local valve operating pressure rating.
Fill each section with water, compressed air, or nitrogen and pressurize for the indicated pressure and time.
b. Notify Architect and local Plumbing Inspector 2 days before tests. c. Drainage, Waste and Vent Piping: Test in accordance with governing plumbing code or as follows: Test drainage and venting systems, with necessary openings plugged, to permit system to be filled with water and subjected to water pressure of minimum of 5 PSI head. System to hold water without water level drop greater than 1/2 pipe diameter of largest nominal pipe size within 24-hour period. Test system in sections if minimum head cannot be maintained in each section. 5 PSI head to be minimum pressure at highest joint.
d. Water Piping: Eliminate air from system. Fill and test at 125 PSIG or minimum 1- 1/2 times static pressure at connection to serving utility main for period of two hours with no loss in pressure.
e. Send test results to Architect for review and approval and include in Operation and Maintenance Manual.
2. Testing of Pressurized Systems:
a. Test each pressurized piping system at 150 percent of operating pressure indicated, but not less than 125 PSIG test pressure.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 785
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-6
b. Observe each test section for leakage at end of test period. Test fails if leakage is observed or if pressure drop exceeds 2 percent of test pressure.
3. Test hot and cold domestic water piping systems upon completion of rough-in and before connection to fixtures at hydrostatic pressure of 125 PSIG.
C. Protection:
1. Keep pipe openings closed by means of plugs or caps to prevent entrance of foreign matter. Protect piping, ductwork, fixtures, equipment and apparatus against dirty water, chemical or mechanical damage both before and after installation. Restore to its original condition or replace fixtures, equipment or apparatus damaged prior to final acceptance of work.
D. Firestopping Penetrations in Fire-Rated Wall/Floor Assemblies:
1. Provide proper sizing when providing sleeves or core-drilled holes to accommodate penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet requirements of ASTM E814.
E. Cut piping squarely, free of rough edges and reamed to full bore. Insert piping fully into fittings.
F. Provide joints of type indicated in each piping system.
G. Thread pipe in accordance with ANSI/ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded ends to remove burrs and restore full inside diameter. Remove excess cutting oil from piping prior to assembly. Apply pipe joint compound, or pipe joint tape (Teflon) where recommended by pipe/fitting manufacturer, on male threads at each joint and tighten joint to leave not more than 3 threads exposed.
H. Sleeves:
1. Pipe Sleeves:
a. Layout work in advance of pouring concrete, furnish, and set sleeves necessary to complete work.
b. Floor Sleeves: Provide sleeves on pipes passing through concrete or masonry construction. Extend sleeve 1-inch above finished floor. Caulk pipes passing through floor with non-shrinking grout or approved caulking compound (except DWV Piping penetrating a concrete slab set on finish grade), provide modular link sealing system for concrete/slab penetrations which are below grade. Caulk/seal piping passing through fire rated building assembly with UL rated assemblies.
Provide fire-rated assemblies per local AHJ requirements c. Wall Sleeves: Provide sleeves on pipes passing through concrete or masonry construction. Provide sleeve flush with finished face of wall. Caulk pipes passing through walls with non-shrinking caulking compound. Provide modular link sealing system for concrete penetrations which are below grade. Caulk/seal piping passing through fire-rated assemblies per local AHJ requirements. d. Beam Sleeves: Coordinate with trades for locations of pipe sleeves in reinforced concrete and steel beams. Indicate penetrations on structural shop drawings. See Drawings and Specifications for specific sleeve location limitations. Plumbing Drawings are diagrammatic. Offset piping as required to meet these limitations.
Pipe sleeve locations must be indicated on reinforced concrete and steel beam shop drawings. Field cutting of beams not allowed without written approval of structural engineer. No extra costs allowed for failure to coordinate beam penetrations prior to reinforced concrete and steel beam shop drawing submittal.
2. Installation of metallic or plastic piping penetrations through non fire-rated walls and partitions and through smoke-rated walls and partitions:
a. Install fabricated pipe sleeve.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 786
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-7
b. After installation of sleeve and piping, tightly pack entire annular void between piping or piping insulation and sleeve identification.
c. Seal each end airtight with a resilient nonhardening seal per code.
3. Piping penetrations through fire-rated (1 to 3 hour) assemblies:
a. Select and install pre-engineered pipe penetration system in accordance with UL listing and manufacturer's recommendation.
b. Provide proper sizing when providing sleeves or core-drilled holes to accommodate penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet requirements of ASTM E84.
3.2 SANITARY, DRAINAGE DWV PIPING, ABOVE GRADE
A. Drainage, Waste and Vent Piping: Test in accordance with governing plumbing code or as follows: Test drainage and venting systems, with necessary openings plugged, to permit system to be filled with water and subjected to water pressure of minimum of 5 PSI head. System to hold water without water level drop greater than 1/2 pipe diameter of largest nominal pipe size within 24-hour period. Test system in sections if minimum head cannot be maintained in each section. 5 PSI head to be minimum pressure at highest joint.
B. Firestopping Penetrations in Fire-Rated Wall/Floor Assemblies:
1. Provide proper sizing when providing sleeves or core-drilled holes to accommodate penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet requirements of ASTM E814.
C. Solder copper tube and fitting joints with lead free nickel/silver bearing solder meeting ASTM Std. B-32, in accordance with IAPMO Is 3-93, ASTM B-828 and Copper Development Association recommended procedures. Clean joints by other than chemical means prior to assembly. "Shock" cooling is prohibited. Fluxes to be water soluble for copper and brass potable water applications, and meeting CDA standard test method 1.0 and ASTM B813-91.
Apply solder until a full fillet is present around the joint. Do not apply solder and flux in such excessive quantities as to run down interior of pipe. Lead solder or corrosion flux not to be present at the jobsite.
D. Cast-Iron Joints: Comply with coupling manufacturer's Cast Iron Soil Pipe Institute Standards and installation instructions.
E. Sanitary Drainage:
1. Grade piping at a uniform pitch of 2 percent unless otherwise noted on Drawings.
2. Indirect Waste or Drain Piping: Extend piping to discharge as shown on Drawings.
Maintain minimum air gap. Provide traps on indirect waste or drain piping exceeding 60- inches.
3. Drains:
a. Install drains to suit finished floor or roof surface. Install drains and components per manufacturer's instructions. Slope flooring to floor drain or sink a minimum of 1/2-inch below finished floor elevation.
b. Install P-traps for hub drains, floor drains and floor sinks. P-traps to be of the same materials as soil and waste piping. Provide trap primer assembly for each drain or floor sink.
4. Wall Access Panel: Secure to wall framing and install so that flange forms a close fitting joint with the finished wall surface.
5. Insulate horizontal branch lines from floor sinks, receptors and drains receiving cold discharge from equipment and appliances.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 787
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-8
3.3 PUMP WASTE PRESSURE PIPING (PUMPED DISCHARGE)
A. Testing of Pressurized Systems:
1. Test each pressurized piping system at 150 percent of operating pressure indicated, but not less than 125 PSIG test pressure.
2. Observe each test section for leakage at end of test period. Test fails if leakage is observed or if pressure drop exceeds 2 percent of test pressure.
B. Firestopping Penetrations in Fire-Rated Wall/Floor Assemblies:
1. Provide proper sizing when providing sleeves or core-drilled holes to accommodate penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet requirements of ASTM E814.
C. Braze copper tube and fitting socket with BCuP series filler metal without flux. Use listed brazing flux for joining of copper tube to brass or bronze fittings, meeting AWS FB3A or FB3C. "Shock" cooling is prohibited. A continuous fillet is to be visible around the completed joint. After cooling, thoroughly remove flux residue with warm water and a brush prior to testing. Do not use BCuP filler on copper alloys containing over 10 percent nickel. Cap or plug piping during construction to prevent entry of foreign material.
D. Welders performing work under this Contract to be certified and qualified in accordance with tests prescribed by the National Certified Welding Bureau (NCWB) or by other approved test procedures using methodology and procedures covered in the ASME Boiler and Pressure Vessel Code, Section IX, "Qualification Standard for Welding and Brazing Procedures, Welders, Brazers, and Welding and Brazing Operators." Installation to conform to ANSI 31.1 "Power Piping."
1. Submit for approval the names, identification, and welder's assigned number, letter or symbol for welders assigned to this project.
2. Use the assigned identification symbol to identify the work of each welder and indelibly stamp immediately upon completion of each weld.
3. Welders to be tested and certified for all positions.
4. Submit identifying stenciled test coupons made by each operator.
5. Welders may be required to retake welding certification tests without additional expense.
6. When so requested, a welder will not be permitted to work as a welder on this project until he has been recertified in accordance with NCWB.
7. Recertification of the welder to be made after the welder has taken and passed the required tests.
E. Weld pipe joints in accordance with recognized industry practice and as follows:
1. Weld pipe joints only when ambient temperature is above 0F.
2. Bevel pipe ends at a 37.5 degree angle where possible, smooth rough cuts, and clean to remove slag, metal particles, and dirt.
3. Use pipe clamps or tack-weld joints with 1-inch long welds, 4 welds for pipe sizes to 10- inches, 8 welds for pipe sizes 12-inches to 20-inches.
4. Build up welds with a stringer-bead pass, followed by a hot pass, followed by a cover or filler pass. Eliminate valleys at center and at edges of each weld. Weld by procedures which will ensure elimination of unsound or unfused metal, cracks, oxidation, blow-holes, and non-metallic inclusions.
5. Do not weld out piping system imperfections by tack-welding procedures. Re-fabricate to comply with requirements.
6. At Installer's option, install forged branch-connection fittings whenever branch pipe is indicated, or install a regular T-fitting.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 788
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-9
3.4 HOT AND COLD DOMESTIC WATER ABOVE GRADE
A. Water Piping: Eliminate air from system. Fill and test at 125 PSIG or minimum 1-1/2 times static pressure at connection to serving utility main for period of two hours with no loss in pressure.
B. Testing of Pressurized Systems:
1. Test each pressurized piping system at 150 percent of operating pressure indicated, but not less than 125 PSIG test pressure.
2. Observe each test section for leakage at end of test period. Test fails if leakage is observed or if pressure drop exceeds 2 percent of test pressure.
C. Test hot and cold domestic water piping systems upon completion of rough-in and before connection to fixtures at hydrostatic pressure of 125 PSIG.
D. Firestopping Penetrations in Fire-Rated Wall/Floor Assemblies:
1. Provide proper sizing when providing sleeves or core-drilled holes to accommodate penetration. Firestop voids between sleeve or core-drilled hole and pipe passing through to meet requirements of ASTM E814.
E. Solder copper tube and fitting joints with lead free nickel/silver bearing solder meeting ASTM Std. B-32, in accordance with IAPMO Is 3-93, ASTM B-828 and Copper Development Association recommended procedures. Clean joints by other than chemical means prior to assembly. "Shock" cooling is prohibited. Fluxes to be water soluble for copper and brass potable water applications, and meeting CDA standard test method 1.0 and ASTM B813-91.
Apply solder until a full fillet is present around the joint. Do not apply solder and flux in such excessive quantities as to run down interior of pipe. Lead solder or corrosion flux not to be present at the jobsite.
F. Braze copper tube and fitting socket with BCuP series filler metal without flux. Use listed brazing flux for joining of copper tube to brass or bronze fittings, meeting AWS FB3A or FB3C. "Shock" cooling is prohibited. A continuous fillet is to be visible around the completed joint. After cooling, thoroughly remove flux residue with warm water and a brush prior to testing. Do not use BCuP filler on copper alloys containing over 10 percent nickel. Cap or plug piping during construction to prevent entry of foreign material.
G. Domestic Water:
1. "Piping" to include pipes, fittings, nipples, valves and accessories connected thereto.
2. Run piping generally parallel to the axis of the building, arranged to conform to the building requirements and to suit the necessities of clearance for other mechanical ducts, flues, conduits and work of other trades, and as close to ceiling or other construction as practical, free of unnecessary traps or bends.
3. Grade water supply piping for complete drainage of the system. Install hose bibbs at low points.
4. Use unions for piping connections to equipment.
5. Provide sufficient elbows, swings and offsets to permit free expansion and contraction.
6. Use reducers or increasers. Use no bushings.
7. Ream or file each pipe to remove burrs. Inspect each length of pipe and each fitting for workmanship and clear passageways.
8. Cover, cap or otherwise protect open ends of piping during construction to prevent damage to threads or flanges and prevent entry of foreign matter. Disinfect and sterilize water supply piping as specified. Furnish written report on final water quality results.
9. Install exposed connections to equipment with special care, showing no tool marks or threads at fittings and piping. No bowed or bent piping permitted.
10. Make ferrous to non-ferrous connections with dielectric fittings.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 789
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING PIPING 22 10 00-10
11. Use extra heavy pipe for nipples, where unthreaded portion is less than 1-1/2-inches.
Use no close nipples. Use only shoulder-type nipples.
12. Through-Wall Pipes: Type 'L' copper tubing for through-wall pipes which connect to exposed stops at wall surface. Anchor the pipes in the wall; attach pipe with U-bolts to steel back-up plates or steel angles anchored in the wall. Provide wrought copper elbow which securely anchors ears in wall at through-wall pipes.
13. Provide drain valves at base of risers and at low points on the system.
14. Backflow Preventers: Pipe relief to nearest drain. Slope at 2 percent.
H. Sterilization of Domestic Water System:
1. General: Upon completion of tests and necessary replacements, thoroughly flush and disinfect domestic water piping.
2. Method: After thoroughly flushing system with water to remove sediment, fill system with a solution containing 50 parts per million of chlorine for not less than 24 hours or 200 parts per million of chlorine for not less than 3 hours. After retention, drain, reflush and return system to service.
3. Certification: Provide copy of domestic water chlorination certificate in each operations and maintenance manual.
4. Provide water line disinfections performed by a licensed contractor with training in potable water line disinfections.
3.5 PIPING SPECIALTIES
A. Drainage, Waste, and Vent Piping: Test in accordance with governing plumbing code or as follows: Test drainage and venting systems, with necessary openings plugged, to permit system to be filled with water and subjected to water pressure of minimum of 5 PSI head. System to hold water without water level drop greater than 1/2 pipe diameter of largest nominal pipe size within 24-hour period. Test system in sections if minimum head cannot be maintained in each section. 5 PSI head to be minimum pressure at highest joint.
B. Cast-Iron Joints: Comply with coupling manufacturer's Cast Iron Soil Pipe Institute Standards and installation instructions.
3.6 CLEANOUTS
A. Install in aboveground piping and building drain piping as indicated, as required by code; at each change in direction of piping greater than 135 degrees; at minimum intervals of 100-feet; and at base of each vertical soil or waste stack. Install floor and wall cleanout covers for concealed piping. Select type to match adjacent building finish. Provide shop drawings to Architect to coordinate locations and types of cleanouts with Architect prior to installation.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 790
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING EQUIPMENT 22 30 00-1
SECTION 22 30 00
PLUMBING EQUIPMENT
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Water Heaters Tank-Less Electric
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Seismic anchor details and calculations signed and stamped by licensed California structural engineer with equipment data.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. NSF 61, Annex G compliant.
2. ISO 9001 Certified.
3. IAPMO Low Lead Certification.
4. California Standard AB 1953.
C. Products approved for installation by state authorizing agency, no exceptions.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Water Heaters Tank-Less Electric:
1. Chronomite InstaFlow Micro Model M
2. EEMax
3. Stiebel Eltron
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 791
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING EQUIPMENT 22 30 00-2
4. Or approved equivalent.
2.2 GENERAL
A. Reference Drawings for capacities and specific model numbers.
2.3 WATER HEATERS TANK-LESS ELECTRIC
A. System: Domestic water.
B. Factory assembled packaged tank-less electric water heater utilizing microprocessor for temperature control. Heat water ways with high temperature coil electrical heating elements. 150 PSI working pressure. Cast aluminum or steel jacket with baked enamel finish. Pilot light to indicate when unit is operating. Prewire heaters ready for single electrical connection and bear UL label. Heater capable of operation within minimum and maximum operating flow rates and pressures of fixtures served and system operating pressure PART 3 - EXECUTION
3.1 GENERAL
A. Examine areas and conditions under which equipment is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.
B. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances.
C. Orients so controls and devices needing service and maintenance have adequate access.
D. Certificates: Submit appropriate Certificates of Shop Inspection and Data Report as required by provisions of ASME Boiler and Pressure Vessel Code.
E. Connect water piping to units with shutoff valves and unions.
F. Equipment Rigging: Heavy duty rigging eye bolts for Crosby Group swivel hoist rings installed over pump access covers for removal or maintenance.
G. Equipment Start-Up:
1. Start-up, test, and adjust equipment in accordance with manufacturer's start-up instructions. Check and calibrate controls.
2. Start-up performed by authorized manufacturer's representative or agent. Provide credentials of start-up personnel to Architect and Owner's Authorized Representative for approval.
3. Remove and replace filters when start-up testing is executed.
4. Manufacturer adjusts operating parameters of equipment to compensate to elevation of 500-feet above sea level.
5. Architect, Commissioning Agent, and Owner's Authorized Representative will be notified 10 days prior to start-up and will be present at start-ups.
6. Provide written report from manufacturer's representative on results of start-up within 48 hours.
7. Technical Training of maintenance staff includes two hours minimum per each piece of equipment.
8. Seismic Verification:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 792
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING EQUIPMENT 22 30 00-3
a. Contractor will retain structural engineer who will submit stamped and signed anchoring and restraint details on plumbing equipment with submittal data in accordance with Division 22, Plumbing requirements.
b. Contractor's Structural Engineer will test and verify in writing that seismic restraints have been installed in accordance with their details.
3.2 WATER HEATERS TANK-LESS ELECTRIC
A. Examine areas and conditions under which equipment is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.
B. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances.
C. Orients so controls and devices needing service and maintenance have adequate access.
D. Certificates: Submit appropriate Certificates of Shop Inspection and Data Report as required by provisions of ASME Boiler and Pressure Vessel Code.
E. Connect water piping to units with shutoff valves and unions.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 793
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING FIXTURES 22 40 00-1
SECTION 22 40 00
PLUMBING FIXTURES
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. General Plumbing Fixtures:
a. China Fixtures, White Only
b. Enameled Steel Fixtures, White Only
c. Faucet Fittings
d. Stainless Steel Fixtures
e. Thermostatic Mixing Valves
2. Fixture Trim
1.2 RELATED SECTIONS
A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Comply with lead free (less than or equal to 0.25 percent) products in drinking water systems.
2. NSF 61, Annex G, Drinking Water System Components, Compliant.
3. ISO 9001, Quality Management Standard Certified.
4. IAPMO Low Lead Certification.
5. California Standard Assembly Bill AB 1953, No-Lead Law
6. Provide fixtures, faucets and accessories to meet barrier free requirements of the governing code with respect to plumbing fixtures provided for the physically handicapped.
7. Items approved for use by State of California.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 794
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING FIXTURES 22 40 00-2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. "Or approved equivalent" as defined in 22 00 00, Plumbing Basic Requirements. Substitution process requirements apply to approved equivalent products.
B. General Plumbing Fixtures: See Schedule on Drawings for type.
1. China Fixtures - White Only:
a. American Standard
b. Briggs
c. Crane
d. Eljer
e. Kohler
f. Universal-Rundle
g. Or approved equivalent.
2. Enameled Steel Fixtures - White Only:
a. American Standard
b. Briggs
c. Crane
d. Eljer
e. Kohler
f. Universal-Rundle
g. Or approved equivalent.
3. Faucet Fittings:
a. Public:
1) American Standard
2) Chicago
3) Delta Commercial
4) Moen Commercial
5) Sloan
6) Symmons
7) T & S Brass
8) Or approved equivalent.
4. Stainless Steel Fixtures:
a. Elkay
b. Haws
c. Just
d. Or approved equivalent.
5. Thermostatic Mixing Valves:
a. Bradley
b. Powers
c. Symmons
d. Holby
e. Or approved equivalent.
C. Fixture Trim:
1. McGuire
2. Dearborn Brass
3. Oatey
4. Or approved equivalent.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 795
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING FIXTURES 22 40 00-3
2.2 GENERAL PLUMBING FIXTURES
A. Review substitution request requirements in Division 01, General Requirements and 22 00 00, Plumbing General Requirements.
B. Reference Architectural Details for mounting height and location of fixtures.
C. Provide factory fabricated fixtures of type, style and material indicated on the plumbing fixture connection schedule shown on the Drawings. For each type fixture, provide fixture manufacturer's standard trim, carrier, seats, and valves as indicated by their published product information; either as designed and constructed, or as recommended by manufacturer, or required for complete installation. Where more than one type is indicated, selection is installer's option; but, fixtures of same type must be furnished by a single manufacturer. Where type is not otherwise indicated, provide fixtures complying with governing regulations.
D. Provide fixtures complete with fittings, supports, fastening devices, bolt caps, faucets, valves, traps, stops and appurtenances.
E. Plumbing Fixture Thermostatic Mixing Valves:
1. Sinks serviced with a single ASSE 1070 mixing valve or multiple sinks served by a single ASSE 1070 mixing valve.
2.3 FIXTURE TRIM
A. Traps: Provide heavy duty commercial grade traps on fixtures except fixtures with integral traps.
Exposed traps will be chromium plated cast brass or 17 gauge chromium plated brass tubing.
1. Sink: McGuire 8912CDF.
2. Lavatory: McGuire 8902CDF.
B. Supplies and Stops: Lead free heavy duty commercial grade, chrome plated with brass stems.
Stops: T-handle or Loose Key type.
1. Lavatory: McGuire LFH2165LK.
2. Sink: McGuire LFH2167LK.
3. Water Closets: McGuire.
C. Lavatory Grid Strainer: McGuire 155A.
D. Sink Grid Strainer: McGuire 152N.
E. Shower Grid Strainer: McGuire 1266.
F. Sink Basket Strainer: McGuire 151.
G. Trim barrier-free wrap for P-traps and supplies by McGuire, Pro-Wrap, Plumberex or Truebro.
H. Escutcheons: McGuire wrought brass deep bell.
I. Wax Rings and Toilet Bolts: WM Harvey No Seep No. 1 053065-N.
PART 3 - EXECUTION
3.1 GENERAL PLUMBING FIXTURE INSTALLATION INFORMATION
A. Verification of Conditions:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 796
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING FIXTURES 22 40 00-4
1. Examine rough-in work of water supply and waste piping systems to verify actual locations of piping connections prior to installing fixtures. Examine floors and substrates, and conditions under which fixture work is to be accomplished. Correct any incorrect locations of piping and other unsatisfactory conditions for installation of plumbing fixtures.
2. Examine walls, floors and cabinets for suitable conditions where fixtures are to be installed.
3. Install plumbing fixtures level and plumb, in accordance with fixture manufacturer's written instructions, rough-in drawings and pertinent codes and regulations, design and referenced standards.
4. Fasten plumbing fixtures securely to supports or building structure. Secure supplies behind or within wall construction to provide rigid installation.
5. Install a stop valve in a readily accessible location in water connection to each fixture.
6. Install escutcheons at each wall, floor and ceiling penetration in exposed finished locations and within cabinets and millwork.
7. Seal fixtures to walls and floors using silicone sealant Dow Corning No. 780 or approved equivalent. Match sealant color to fixture color.
8. Test fixtures to demonstrate proper operation upon completion of installation and after units are water pressurized. Replace malfunctioning units, then retest.
9. Inspect each unit for damage prior to installation. Replace damaged fixtures.
10. Replace washers or cartridges of leaking or dripping faucets and stops.
11. Clean fixtures, trim and strainers using manufacturer's recommended cleaning methods and materials.
12. During construction, cover installed fixtures, drains, sinks and water coolers with cardboard and wrap with sheet plastic.
13. Provide trap primers for floor drains, floor sinks, trench drains and hub drains.
14. Install roof and overflow roof drains per architectural details. Cover drains during roof construction to protect drain. Provide offsets or expansion joints at each roof/overflow drain.
15. Do not use lead flashing.
B. Owner Furnished Equipment:
1. Rough-in and make final connections to Owner furnished equipment. Provide necessary items to complete installation.
2. Comply with requirements of this Section and Drawings for installation procedures.
C. Adjusting and Cleaning: Clean plumbing fixtures, trim, and strainers of dirt and debris upon completion of installation. Adjust water pressure at drinking fountains, faucets, shower valves and flush valves to provide proper flow stream and specified GPM. Repair leaks at faucets and stops.
D. Extra Stock: Furnish special wrenches and other devices necessary for servicing plumbing fixtures and trim to Owner.
E. Field Quality Control: Upon completion of installation of plumbing fixtures, test fixtures to demonstrate capability and compliance with Specifications. Correct or replace malfunctioning units at site, then retest to demonstrate compliance.
F. Protection: Protect fixtures and equipment from damage. Cover finished fixtures with cardboard and sheet plastic. Fixtures are not to be used during construction. Replace damaged items with new.
G. Signage: For fixtures that do not have ASSE 1070 mixing valve protection for hot water temperature, provide signage per Section 22 05 53, Identification for Plumbing Piping and Equipment.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 797
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
PLUMBING FIXTURES 22 40 00-5
3.2 FIXTURE TRIM INSTALLATION
A. Install components in accordance with manufacturer's instructions and approved product data submittals.
B. Set plumb, level and rigid.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 798
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-1
SECTION 23 00 00
HEATING, VENTILATING AND AIR CONDITIONING (HVAC) BASIC REQUIREMENTS PART 1 - GENERAL
1.1SECTION INCLUDES
A. Work included in 23 00 00, HVAC Basic Requirements applies to Division 23, HVAC work to provide materials, labor, tools, permits, incidentals, and other services to provide and make ready for Owner's use of heating, ventilating and air conditioning systems for proposed project.
B. Contract Documents include, but are not limited to, Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Drawings, Addenda, Owner/Architect Agreement, and Owner/Contractor Agreement. Confirm requirements before commencement of work.
C. Definitions:
1. Provide: To furnish and install, complete and ready for intended use.
2. Furnish: Supply and deliver to project site, ready for unpacking, assembly and installation.
3. Install: Includes unloading, unpacking, assembling, erecting, installation, applying, finishing, protecting, cleaning and similar operations at project site as required to complete items of work provided.
4. Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent", substitution requests must be submitted to Engineer for consideration, in accordance with Division 01, General Requirements, and approved by the Engineer prior to submitting bids for substituted items.
5. Authority Having Jurisdiction (AHJ): Indicates reviewing authorities, including local fire marshal, Owner's insurance underwriter, Owner's Authorized Representative, and other reviewing entity whose approval is required to obtain systems acceptance.
1.2 RELATED SECTIONS
A. Contents of Section applies to Division 23, HVAC Contract Documents.
B. Related Work:
1. Additional conditions apply to this Division including, but not limited to:
a. Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements.
b. Drawings
c. Addenda
d. Owner/Architect Agreement
e. Owner/Contractor Agreement
f. Codes, Standards, Public Ordinances and Permits
1.3 REFERENCES AND STANDARDS
A. References and Standards per Division 01, General Requirements, individual Division 23, HVAC Sections and those listed in this Section.
B. Codes to include latest adopted editions, including current amendments, supplements and local jurisdiction requirements in effect as of the date of the Contract Documents, of/from:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 799
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-2
1. State of California:
a. CBC - California Building Code
b. CEC - California Electrical Code
c. CEC T24 - California Energy Code Title 24
d. CFC - California Fire Code
e. CMC - California Mechanical Code
f. CPC - California Plumbing Code
g. CSFM - California State Fire Marshal
C. Reference standards and guidelines include but are not limited to the latest adopted editions from:
1. ABA - Architectural Barriers Act
2. ABMA - American Bearing Manufacturers Association
3. ADA - Americans with Disabilities Act
4. AHRI - Air-Conditioning Heating & Refrigeration Institute
5. AMCA - Air Movement and Control Association
6. ANSI - American National Standards Institute
7. ASCE - American Society of Civil Engineers
8. ASHRAE - American Society of Heating, Refrigeration and Air-Conditioning Engineers
9. ASHRAE Guideline 0, The Commissioning Process
10. ASME - American Society of Mechanical Engineers
11. ASPE - American Society of Plumbing Engineers
12. ASSE - American Society of Sanitary Engineering
13. ASTM - ASTM International
14. AWWA - American Water Works Association
15. IAPMO - International Association of Plumbing & Mechanical Officials
16. ISO - International Organization for Standardization
17. MSS - Manufacturers Standardization Society
18. NEC - National Electric Code
19. NEMA - National Electrical Manufacturers Association
20. NRCA - National Roofing Contractors Association
21. NSF - National Sanitation Foundation
22. OSHA - Occupational Safety and Health Administration
23. SMACNA - Sheet Metal and Air Conditioning Contractors' National Association, Inc.
D. See Division 23, HVAC individual Sections for additional references.
1.4 SUBMITTALS
A. See Division 01, General Requirements for Submittal Procedures as well as specific individual Division 23, HVAC Sections.
B. Provide drawings in format and software release equal to the design documents. Drawings to be the same sheet size and scale as the Contract Documents.
C. In addition:
1. "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract Documents. Contractor is responsible for the dimensions and quantity and will confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work.
2. Provide product submittals and shop drawings in electronic format only. Electronic format must be submitted via zip file via e-mail and be native/searchable PDF format. Scanned October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 800
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-3
copies are not acceptable. For electronic format, provide one file per division containing one bookmarked PDF file with each bookmark corresponding to each Specification Section. Arrange bookmarks in ascending order of Specification Section number.
Individual submittals sent piecemeal in a per Specification Section method will be returned without review or comment. All transmissions/submissions to be submitted to Architect. Deviations will be returned without review.
3. Product Data: Provide Manufacturer's descriptive literature for products specified in Division 23, HVAC Sections.
4. Identify/mark each submittal in detail. Note what differences, if any, exist between the submitted item and the specified item. Failure to identify the differences will be considered cause for disapproval. If differences are not identified and/or not discovered during the submittal review process, Contractor remains responsible for providing equipment and materials that meet the Specifications and Drawings. a. Label submittal to match numbering/references as shown in Contract Documents.
Highlight and label applicable information to individual equipment or cross out/remove extraneous data not applicable to submitted model. Clearly note options and accessories to be provided, including field installed items. Highlight connections by/to other trades.
b. Include technical data, installation instructions and dimensioned drawings for products, fixtures, equipment and devices installed, furnished or provided.
Reference individual Division 23, HVAC Specification Sections for specific items required in product data submittal outside of these requirements. c. For vibration isolation of equipment, list make and model selected with operating load and deflection.
d. See Division 23, HVAC individual Sections for additional submittal requirements outside of these requirements.
5. Maximum of two reviews of submittal package. Arrange for additional reviews and/or early review of long-lead items; bear costs of these additional reviews at Engineer's hourly rates. Incomplete submittal packages/submittals will be returned to contractor without review.
6. Structural/Seismic: Provide weights, dimensions, mounting requirements and like information required for mounting, seismic bracing, and support. Indicate manufacturer's installation and support requirements to meet Section 23 05 48, Vibration and Seismic Controls for HVAC Equipment. Provide engineered seismic drawings and equipment seismic certification. Equipment Importance Factor as specified in Division 01 and in Structural documents.
7. Trade Coordination: Include physical characteristics, electrical characteristics, device layout plans, wiring diagrams, and connections as required by Division 23, HVAC Coordination Documents. For equipment with electrical connections, furnish copy of approved submittal for inclusion in Division 26, Electrical submittals.
8. Make provisions for openings in building for admittance of equipment prior to start of construction or ordering of equipment.
9. Substitutions and Variation from Basis of Design:
a. The Basis of Design designated product establishes the qualities and characteristics for the evaluation of any comparable products by other listed acceptable manufacturers if included in this Specification or included in an approved Substitution Request as judged by the Design Professional. b. If substitutions and/or equivalent equipment/products are being proposed, it is the responsibility of parties proposing the substitute and/or equivalent equipment to verify and compare the characteristics and requirements of that furnished to that specified and/or shown. If greater capacity and/or more materials and/or more labor is required for the rough-in, circuitry or connections than for the item specified and provided for, then provide compensation for additional charges required for the proper rough-in, circuitry and connections for the equipment being furnished. No additional charges above the Base Bid, including resulting charges for work performed under other Divisions, will be allowed for such revisions.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 801
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-4
Coordinate with the requirements of "Submittals." For any product marked "or approved equivalent," a substitution request must be submitted to Engineer for approval prior to bid.
10. Shop Drawings: Provide coordinated shop drawings which include physical characteristics of all systems, equipment, ductwork and piping layout plans, and control wiring diagrams. Reference individual Division 23, HVAC Specification Sections for additional requirements for shop drawings outside of these requirements. a. Provide Shop Drawings indicating access panel locations for items that require Code or maintenance access, size and elevation for approval prior to installation.
11. Samples: Provide samples when requested by individual Sections.
12. Resubmission Requirements:
a. Make corrections or changes in submittals as required in response to Engineer’s comments. Provide a cover letter with resubmittal that includes responses to each of the Engineer’s submittal review comments and identifies changes in the resubmittal. Cloud changes in the submittals.
1) Resubmit for review until review indicates “no exception taken” or “make corrections noted.”
2) When submitting drawings for Engineer's re-review, clearly indicate changes on drawings and cloud any revisions. Submit a list describing each change.
13. Operation and Maintenance Manuals, Owner's Instructions:
a. Submit, at one time, electronic files (native/searchable PDF format) of manufacturer's operation and maintenance instruction manuals and parts lists for equipment or items requiring servicing. Submit data when work is substantially complete and in same order format as submittals. Include name and location of source parts and service for each piece of equipment.
1) Include copy of approved submittal data along with submittal review letters received from Engineer. Data to clearly indicate installed equipment model numbers. Delete or cross out data pertaining to other equipment not specific to this project.
2) Include copy of manufacturer's standard Operations and Maintenance for equipment. At front of each tab, provide routine maintenance documentation for scheduled equipment. Include manufacturer's recommended maintenance schedule and highlight maintenance required to maintain warranty. Furnish list of routine maintenance parts, including part numbers, sizes, quantities, relevant to each piece of equipment: belts, motors, lubricants, and filters.
3) Include Warranty per Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Sections.
4) Include product certificates of warranties and guarantees. 5) Include copy of complete parts list for equipment. Include available exploded views of assemblies and sub assemblies.
6) Include copy of startup and test reports specific to each piece of equipment. 7) Include copy of final air and water systems balancing log along with pump, fan and distribution system operating data.
8) Include commissioning reports.
9) Include copy of valve charts/schedules.
10) Engineer will return incomplete documentation without review. Engineer will provide one set of review comments in Submittal Review format. Contractor must arrange for additional reviews; Contractor to bear costs for additional reviews at Engineer's hourly rates.
b. Thoroughly instruct Owner in proper operation of equipment and systems. Where noted in individual Sections, training will include classroom instruction with applicable training aids and systems demonstrations. Field instruction per Section 23 00 00, HVAC Basic Requirements Article titled "Demonstration." October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 802
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-5
c. Copies of certificates of code authority inspections, acceptance, code required acceptance tests, letter of conformance and other special guarantees, certificates of warranties, specified elsewhere or indicated on Drawings.
14. Record Drawings:
a. Maintain at site at least one set of drawings for recording “As-constructed” conditions. Indicate on drawings changes to original documents by referencing revision document, and include buried elements, location of cleanouts, and location of concealed mechanical items. Include items changed by field orders, supplemental instructions, and constructed conditions.
b. Record Drawings are to include equipment and fixture/connection schedules, control dampers, fire smoke dampers, fire dampers, valves, bottom of pipe, duct and equipment elevations and dimensioned locations for all distribution systems (hydronic and air). Invert elevations and dimensioned locations for underground systems below grade to 5-feet outside building that accurately reflect "as constructed or installed" for project.
c. At completion of project, input changes to original project Revit Model and make one set of black-line drawings created from Revit Model in version/release equal to contract drawings. Submit Revit Model and drawings upon substantial completion. d. See Division 23, HVAC individual Sections for additional items to include in record drawings.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Work and materials installed to conform with all local, State and Federal codes, and other applicable laws and regulations. Where code requirements are at variance with Contract Documents, meet code requirements as a minimum requirement and include costs necessary to meet these in Contract. Machinery and equipment are to comply with OSHA requirements, as currently revised and interpreted for equipment manufacturer requirements. Install equipment provided per manufacturer recommendations.
B. Whenever this Specification calls for material, workmanship, arrangement or construction of higher quality and/or capacity than that required by governing codes, higher quality and/or capacity take precedence.
C. Drawings are intended to be diagrammatic and reflect the Basis of Design manufacturer's equipment. They are not intended to show every item in its exact dimensions, or details of equipment or proposed systems layout. Verify actual dimensions of systems (i.e., piping) and equipment proposed to assure that systems and equipment will fit in available space. Contractor is responsible for design and construction costs incurred for equipment other than Basis of Design, including, but not limited to, architectural, structural, electrical, HVAC, fire sprinkler, and plumbing systems.
D. Manufacturer's Instructions: Follow manufacturers' written instructions. If in conflict with Contract Documents, obtain clarification. Notify Engineer/Architect, in writing, before starting work.
E. Items shown on Drawings are not necessarily included in Specifications or vice versa. Confirm requirements in all Contract Documents.
F. Provide products that are UL listed.
G. Piping and duct insulation products to contain less than 0.1 percent by weight PBDE in all insulating materials.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 803
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-6
1.6 WARRANTY
A. Provide written warranty covering the work for a period of one year from date of Substantial Completion in accordance with Division 00, Contracting and Procurement Requirements, Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
B. Sections under this Division can require additional and/or extended warranties that apply beyond basic warranty under Division 01, General Requirements and the General Conditions.
Confirm requirements in all Contract Documents.
1.7 COORDINATION DOCUMENTS
A. Prior to construction, prepare and submit coordinated layout drawings (composite drawings), to coordinate installation and location of ductwork, grilles, diffusers, piping, fire sprinklers, plumbing, lights, and electrical services. Composite Drawings show services on single sheet.
Key Drawings to structural column identification system. Prior to completion of Drawings, coordinate proposed installation with architectural and structural requirements, and other trades (including plumbing, HVAC, fire protection, electrical, ceiling suspension, and ceiling tile systems, etc.), and provide maintenance access requirements. Coordinate with submitted architectural systems (i.e. roofing, ceiling, finishes) and structural systems as submitted, including footings and foundation. Identify zone of influence from footings and ensure systems are not routed within the zone of influence.
B. Prepare Drawings as follows:
1. Drawings in Revit model. Revit model release equal to design documents. Drawings to be same sheet size and scale as Contract Drawings and indicate location, size, and elevation above finished floor of equipment and distribution systems.
2. Review and revise, as necessary, section cuts in Contract Drawings after verification of field conditions.
3. Indicate hydronic and air distribution system piping including fittings, hangers, access panels, valves, and bottom of pipe and duct elevations above finished floor.
4. Indicate inverts and provision for piping that must be graded to have right-of-way over more flexible items. Drawings also to indicate proposed ceiling grid and lighting layout as shown on electrical drawings and architectural reflected ceiling drawings and HVAC equipment, ductwork and piping.
5. Incorporate Addenda items and change orders.
6. Distribute drawings to trades and provide additional coordination as requested by other trades.
C. Advise Architect in event conflict occurs in location or connection of equipment. Bear costs resulting from failure to properly coordinate installation or failure to advise Architect of conflict.
D. Verify in field exact size, location, invert, and clearances regarding existing material, equipment and apparatus, and advise Architect of discrepancies between that indicated on Drawings and that existing in field prior to installation related thereto.
E. Submit final Coordination Drawings with changes as Record Drawings at completion of project.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 804
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-7
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Articles, fixtures, and equipment of a kind to be standard product of one manufacturer, including but not limited to pumps, fans, valves, control devices, air handlers, vibration isolation devices, etc.
2.2 STANDARDS OF MATERIALS AND WORKMANSHIP
A. Base contract upon furnishing materials as specified. Materials, equipment, and fixtures used for construction are to be new, latest products as listed in manufacturer's printed catalog data and are to be UL or ETL listed and labeled or be approved by State, County, and City authorities prior to procurement and installation.
B. Names and manufacturer's names denote character and quality of equipment desired and are not to be construed as limiting competition.
C. Hazardous Materials:
1. Comply with local, State of California, and Federal regulations relating to hazardous materals.
2. Comply with Division 00, Procurement and Contracting Requirements and Division 01, General Requirements for this project relating to hazardous materials.
3. Do not use any materials containing a hazardous substance. If hazardous materials are encountered, do not disturb; immediately notify Owner and Architect. Hazardous materials will be removed by Owner under separate contract.
PART 3 - EXECUTION
3.1 ACCESSIBILITY AND INSTALLATION
A. Confirm Accessibility and Installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
B. Install equipment having components requiring access (i.e., drain pans, drains, control operators, valves, motors and vibration isolation devices) so that they may be serviced, reset, replaced or recalibrated by service people with normal service tools and equipment. Do not install equipment in obvious passageways, doorways, scuttles or crawlspaces which would impede or block intended usage.
C. Install equipment and products complete as directed by manufacturer's installation instructions including all appurtenances recommended in manufacturer's installation instructions, at no additional charge to Owner. Obtain installation instructions from manufacturer prior to rough-in of equipment and examine instructions thoroughly. When requirements of installation instructions conflict with Contract Documents, request clarification from Architect prior to proceeding with installation. This includes proper installation methods, sequencing and coordination with other trades and disciplines.
D. Earthwork:
1. Confirm Earthwork requirements in Contract Documents. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
a. Perform excavation, dewatering, shoring, bedding, and backfill required for installation of work in this Division in accordance with related earthwork Sections.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 805
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-8
Contact utilities and locate existing utilities prior to excavation. Repair any work damaged during excavation or backfilling.
b. Excavation: Do not excavate under footings, foundation bases, or retaining walls. c. Provide protection of underground systems. Review the project Geotechnical Report for references to corrosive or deleterious soils which will reduce the performance or service life of underground systems materials.
E. Firestopping:
1. Confirm Firestopping requirements in Division 07, Thermal and Moisture Protection. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
a. Coordinate location and protection level of fire and/or smoke rated walls, ceilings, and floors. When these assemblies are penetrated, seal around piping, ductwork and equipment with approved firestopping material. Install firestopping material complete as directed by manufacturer's installation instructions. Meet requirements of ASTM E814, Standard Test Method for Fire Tests of Through-Penetration Fire Stops.
F. Pipe Installation:
1. Provide installation of piping systems coordinated to account for expansion and contraction of piping materials and building, as well as anticipated settlement or shrinkage of building. Install work to prevent damage to piping, equipment, and building and its contents. Provide piping offsets, loops, seismic flexible joints, expansion joints, sleeves, anchors or other means to control pipe movement and minimize forces on piping. Verify anticipated settlement and/or shrinkage of building with Project Structural Engineer. Verify construction phasing, type of building construction products and rating for coordinating installation of piping systems.
2. Include provisions for servicing and removal of equipment without dismantling piping.
G. Plenums:
1. Plenums: Materials within plenums shall be noncombustible or shall have a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E 84 or UL 723. Immediately notify Architect/Engineer of any discrepancy.
H. Provide miscellaneous supports/metals required for installation of equipment, piping, and ductwork.
3.2 SEISMIC CONTROL
A. Confirm Seismic Control requirements in Division 01, General Requirements, Structural documents, Section 23 0548, Vibration and Seismic Controls for HVAC Equipment, and individual Division 23 HVAC Sections.
B. General:
1. Earthquake resistant designs for HVAC (Division 23) equipment and distribution, i.e. motors, ductwork, piping, equipment, etc. to conform to regulations of jurisdiction having authority.
2. Restraints which are used to prevent disruption of function of piece of equipment because of application of horizontal force to be such that forces are carried to frame of structure in such a way that frame will not be deflected when apparatus is attached to a mounting base and equipment pad, or to structure in normal way, utilizing attachments provided. Secure equipment and distribution systems to withstand a force in direction equal to value defined by jurisdiction having authority.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 806
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-9
3. Provide stamped Shop Drawings from licensed Structural Engineer of seismic bracing and seismic movement assemblies for piping equipment and water heaters. Submit Shop Drawings along with equipment submittals.
4. Provide stamped Shop Drawings from licensed Structural Engineer of seismic flexible joints for piping and crossing building expansion or seismic joints. Submit Shop Drawings along with seismic bracing details.
C. Piping and Ductwork:
1. Per CBC or local requirements.
D. Provide means to prohibit excessive motion of mechanical equipment during earthquake.
3.3 REVIEW AND OBSERVATION
A. Confirm Review and Observation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
B. Notify Architect, in writing, at following stages of construction so that they may, at their option, visit site for review and construction observation:
1. Underground system installation prior to backfilling.
2. Prior to covering walls.
3. Prior to ceiling cover/installation.
4. After major equipment is installed.
5. When main systems, or portions of, are being tested and ready for inspection by AHJ.
C. Final Punch:
1. Prior to requesting a final punch visit from the Engineer, request from Engineer the Mechanical Precloseout Checklist, complete the checklist confirming completion of systems’ installation, and return to Engineer. Request a final punch visit from the Engineer, upon Engineer’s acceptance that the mechanical systems are ready for final punch.
2. Costs incurred by additional trips required due to incomplete systems will be the responsibility of the To Be DeterminedContractor.
3.4 CUTTING AND PATCHING
A. Confirm Cutting and Patching requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
1. Proposed floor cutting/core drilling/sleeve locations to be approved by Project Structural Engineer. Submit proposed locations to Architect/Project Structural Engineer. Where slabs are of post tension construction, perform x-ray scan of proposed penetration locations and submit scan results including proposed penetration locations to Project Structural Engineer/Architect for approval. Where slabs are of waffle type construction, show column cap extent and cell locations relative to proposed penetration(s).
2. Cutting, patching and repairing for work specified in this Division including plastering, masonry work, concrete work, carpentry work, and painting included under this Section will be performed by skilled craftspeople of each respective trade in conformance with appropriate Division of Work.
3. Additional openings required in building construction to be made by drilling or cutting.
Use of jack hammer is specifically prohibited. Patch openings in and through concrete and masonry with grout.
4. Restore new or existing work that is cut and/or damaged to original condition. Patch and repair specifically where existing items have been removed. This includes repairing and October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 807
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-10
painting walls, ceilings, etc. where existing conduit and devices are removed as part of this project. Where alterations disturb lawns, paving, and walks, surfaces to be repaired, refinished and left in condition matching existing prior to commencement of work.
5. Additional work required by lack of proper coordination will be provided at no additional cost to the Owner.
3.5 EQUIPMENT SELECTION AND SERVICEABILITY
A. Replace or reposition equipment which is too large or located incorrectly to permit servicing, at no additional cost to Owner.
B. Maintain design intent where equipment other than as shown as Basis of Design in Contract Documents is provided. Where equipment requires ductwork or piping arrangement, controls/control diagrams, or sequencing different from that indicated in Contract Documents, provide at no additional cost to Owner.
3.6 DELIVERY, STORAGE AND HANDLING
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
1. Handle materials delivered to project site with care to avoid damage. Store materials on site inside building or protected from weather, dirt and construction dust. Insulation and lining that becomes wet from improper storage and handling to be replaced before installation. Products and/or materials that become damaged due to water, dirt, and/or dust as a result of improper storage to be replaced before installation.
2. Protect equipment and pipe to avoid damage. Close pipe openings with caps or plugs.
Keep motors and bearings in watertight and dustproof covers during entire course of installation.
3. Protect bright finished shafts, bearing housings and similar items until in service.
3.7 DEMONSTRATION
A. Confirm Demonstration requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
B. Upon completion of work and adjustment of equipment and test systems, demonstrate to Owner's Authorized Representative, Architect and Engineer that equipment furnished and installed or connected under provisions of these Specifications functions in manner required.
Provide field instruction to Owner's Maintenance Staff as specified in Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
C. Manufacturer's Field Services: Furnish services of a qualified person at time approved by Owner, to instruct maintenance personnel, correct defects or deficiencies, and demonstrate to satisfaction of Owner that entire system is operating in satisfactory manner and complies with requirements of other trades that may be required to complete work. Complete instruction and demonstration prior to final job site observations.
3.8 CLEANING
A. Confirm Cleaning requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 808
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-11
B. Upon completion of installation, thoroughly clean exposed portions of equipment, removing temporary labels and traces of foreign substances. Throughout work, remove construction debris and surplus materials accumulated during work.
3.9 START UP
A. Start up equipment, in accordance with manufacturer's start-up instructions, and in presence of manufacturer's representative. Test controls and demonstrate compliance with requirements.
Replace damaged or malfunctioning controls and equipment.
1. Do not place equipment in sustained operation prior to initial balancing of HVAC systems.
3.10 PAINTING
A. Confirm Painting requirements in Division 01, General Requirements and Division 09, Finishes.
In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
1. Ferrous Metal: After completion of work, thoroughly clean and paint exposed supports constructed of ferrous metal surfaces in mechanical rooms, i.e., hangers, hanger rods, equipment stands, with one coat of black asphalt varnish for exterior or black enamel for interior, suitable for hot surfaces.
2. After acceptance by Authority Having Jurisdiction (AHJ), In a mechanical room, on roof or other exposed areas, machinery and equipment not painted with enamel to receive two coats of primer and one coat of rustproof enamel, colors as selected by Architect.
3. See individual equipment Specifications for other painting.
4. Structural Steel: Repair damage to structural steel finishes or finishes of other materials damaged by cutting, welding or patching to match original.
5. Piping and Ductwork: Clean, primer coat and paint exposed piping and ductwork on roof or at other exterior locations with two coats paint suitable for metallic surfaces and exterior exposures. Color selected by Architect.
6. Covers: Covers such as manholes, cleanouts and the like will be furnished with finishes which resist corrosion and rust.
3.11 DEMOLITION
A. Confirm requirements in Division 01, General Requirements and Division 02, Existing Conditions. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
1. Scope:
a. It is the intent of these documents to provide necessary information and adjustments to the HVAC system required to meet code, and accommodate installation of new work.
b. Coordinate with Owner so that work can be scheduled not to interrupt operations, normal activities, building access or access to different areas. c. Existing Conditions: Determine exact location of existing utilities and equipment before commencing work, compensate Owner for damages caused by failure to exactly locate and preserve utilities. Replace damaged items with new material to match existing. Promptly notify Owner if utilities are found which are not shown on Drawings.
2. Equipment: Unless otherwise directed, equipment, fixtures, or fittings being removed as part of demolition process are Owner's property. Remove other items not scheduled to be reused or relocated from job site as directed by Owner.
3. Unless specifically indicated on Drawings, remove exposed, unused ductwork and piping to behind finished surfaces (floor, walls, ceilings, etc.). Cap and patch surfaces to match surrounding finish.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 809
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-12
4. Unless specifically indicated on Drawings, remove unused equipment, fixtures, fittings, rough-ins, and connectors. Removal is to be to a point behind finished surfaces (floors, walls, and ceilings).
3.12 ACCEPTANCE
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In absence of specific requirements, comply with individual Division 23, HVAC Sections and the following:
1. System cannot be considered for acceptance until work is completed and demonstrated to Architect that installation is in strict compliance with Specifications, Drawings and manufacturer's installation instructions, particularly in reference to following:
a. Testing and Balancing Reports
b. Cleaning
c. Operation and Maintenance Manuals
d. Training of Operating Personnel
e. Record Drawings
f. Warranty and Guaranty Certificates
g. Start-up/Test Document
h. Commissioning Reports
B. Reference State of California requirements for specific testing procedures and documentation requirements. Comply with State and local governmental standards and requirements for testing, and completion and submittal of appropriate forms as required by Title 24 and local governmental agencies related to this work.
3.13 FIELD QUALITY CONTROL
A. Confirm Field Quality Control requirements in Division 01, General Requirements, Section 23 00 00, HVAC Basic Requirements and individual Division 23, HVAC Sections.
B. Tests:
1. Conduct tests of equipment and systems to demonstrate compliance with requirements specified. Reference individual Specification Sections for required tests. Document tests and include in Operation and Maintenance Manuals.
2. During site evaluations by Architect or Engineer, provide appropriate personnel with tools to remove and replace trims, covers, and devices so that proper evaluation of installation can be performed.
3.14 LETTER OF CONFORMANCE
A. Provide Letter of Conformance, copies of manufacturers' warranties and extended warranties with a statement that HVAC items were installed in accordance with manufacturer's recommendations, UL listings and FM Global approvals. Include Letter of Conformance, copies of manufacturers' warranties and extended warranties in Operation and Maintenance Manuals.
3.15 ELECTRICAL INTERLOCKS
A. Where equipment motors are to be electrically interlocked with other equipment for simultaneous operation, utilize equipment wiring diagrams to coordinate with electrical systems so that proper wiring of equipment involved is affected.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 810
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) BASIC REQUIREMENTS 23 00 00-13
3.16 TEMPORARY HEATING, COOLING AND HUMIDITY CONTROL
A. Provide temporary heating, cooling, controls, humidification and dehumidification as required to facilitate the construction of the project. Size and select temporary system based on the requirements of the various trades during construction. This includes, but is not limited to, drywall, case work, wood flooring and wood finishes that are subject to warping. Size and install system to prevent mold growth. Coordinate the location of the temporary system. The house system can be used. Develop a procedure for how the house system will be used including a sketch depicting the house system, how filtration will be used to prevent construction debris from entering the system and how often the filters will be changed, how the ductwork will be cleaned after use to ensure a clean system is turned over to the Owner and how the units are sized. Submit this procedure to the Mechanical Engineer for review. Follow National Air Duct Cleaners Association (NADCA) duct cleaning procedures and guidelines. Warranties for the house system, if new, to commence when the Owner moves in if house system is used as the means to maintain the climate within the building during construction. Include this warranty requirement in the original bid or proposal amount. Coordinate and provide any temporary power, controls, ductwork, piping, plumbing anchorage, miscellaneous steel and structural supports required to support the temporary system. Installation of the system to comply with all applicable codes and be acceptable to the Authority Having Jurisdiction (AHJ).
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 811
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
METERS AND GAUGES FOR HVAC PIPING 23 05 19-1
SECTION 23 05 19
METERS AND GAUGES FOR HVAC PIPING
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Separable Sockets
2. Thermometer Wells
3. Test Plugs
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Maintenance Materials:
a. Extra gauge Oil for Inclined Manometers: One bottle. b. Extra Pressure Gauges: One.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 SEPARABLE SOCKETS
A. Manufacturers:
1. Kimray
2. Weiss
3. Trerice
B. Description: Fitting with protective socket for installation in threaded pipe fitting to hold fixed thermometer stem.
1. Material: Brass, for use in copper piping.
2. Material: Stainless steel, for use in steel piping.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 812
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
METERS AND GAUGES FOR HVAC PIPING 23 05 19-2
3. Extension-Neck Length: Nominal thickness of 2-inches, but not less than thickness of insulation. Omit extension neck for sockets for piping not insulated.
4. Insertion Length: To extend to center of pipe.
5. Cap: Threaded, with chain permanently fastened to socket.
6. Heat Transfer Fluid: Oil or graphite.
2.2 THERMOMETER WELLS
A. Manufacturers:
1. Ashcroft
2. Omega
3. Weiss
B. Description: Fitting with protective well for installation in threaded pipe fitting to hold test thermometer.
1. Material: Brass for use in copper piping.
2. Material: Stainless steel, for use in steel piping.
3. Extension Neck Length: Nominal thickness of 2-inches, but not less than thickness of insulation. Omit extension neck for wells for piping not insulated.
4. Insertion Length: To extend to center of pipe.
5. Cap: Threaded, with chain permanently fastened to socket.
6. Heat Transfer Fluid: Oil or graphite.
2.3 TEST PLUGS
A. Manufacturers:
1. Pete's Plug
2. Or approved equivalent.
B. Description: Nickel-plated, brass-body test plug in NPS 1/2 (DN15) fitting.
C. Body: Length as required to extend beyond insulation.
D. Pressure Rating: 500 PSIG (3450 kPa) minimum.
E. Core Inserts: One or two self-sealing valves, suitable for inserting 1/8-inch OD probe from dial- type thermometer or pressure gauge.
F. Core Material for Air, Water, Oil and Gas: 20 to 200 degrees F (minus 7 to plus 93 degrees Celsius), chlorosulfonated polyethylene synthetic rubber.
G. Test Plug Cap: Gasketed and threaded cap, with retention chain or strap.
H. Test Kit: Pressure gauge and adapter with probe, two bimetal dial thermometers, and carrying case.
1. Pressure Gauge and Thermometer Ranges: Approximately two times the system's operating conditions.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Provide instruments with scale ranges selected according to service with largest appropriate scale.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 813
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
METERS AND GAUGES FOR HVAC PIPING 23 05 19-3
3.2 SEPARABLE SOCKETS
A. Inspect the openings in the vessel for foreign material and clean the connection ports to remove scale, chips and debris.
B. Install thermostats with separable sockets. Install the separable socket using good piping practice. Be sure to use TFE tape or pipe thread sealant on external pipe threads.
C. Never stand directly over or in front of a valve or controller when the system is pressurized.
D. Assure the separable socket is completely submerged in liquid or flow stream. Partial submersion will give erratic temperature transfer to thermostat.
E. Pack separable socket full with high temp bearing grease. This helps in heat transfer and prevents air space.
3.3 THERMOMETER WELLS
A. Install in piping in vertical upright position. Fill well with oil or graphite, secure cup.
3.4 TEST PLUGS
A. Locate test plugs adjacent to thermometers and thermometer sockets, adjacent to pressure gauges and pressure gauge taps, adjacent to control device sockets, or where indicated.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 814
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR HVAC PIPING 23 05 23-1
SECTION 23 05 23
GENERAL-DUTY VALVES FOR HVAC PIPING
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Balancing Valves
2. Ball Valves
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations for Valves: Obtain each type of valve from a single source and from a single manufacturer.
B. Valves, General:
1. Apollo
2. Armstrong
3. ASCO
4. Cla-Val
5. Conbraco
6. Crane
7. Clow
8. Griswold
9. Hammond
10. Hays
11. Jenkins
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 815
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR HVAC PIPING 23 05 23-2
12. Josam
13. Kennedy
14. Milwaukee
15. Mueller
16. Nibco
17. Red-White Valve
18. Smith
19. Stockham
20. Tour & Andersson
21. Wade
22. Watts
23. Wilkins
24. Zurn
C. Balancing Valves:
1. Griswold
2. Hays
3. Armstrong CBV
4. Tour & Andersson
5. Victaulic (T&A Valves only)
D. Ball Valves:
1. See Valves General above.
2. NSF Valves:
a. Clow
b. Kennedy
c. Nibco
2.2 VALVES - GENERAL
A. General:
1. Sizes: Unless otherwise indicated, provide valves of same size as upstream pipe size.
2. Operators: Provide handwheels, fastened to valve stem, for valves other than quarter- turn. Provide lever handle for quarter-turn valves 6 inches and smaller. Provide gear operators for quarter-turn valves 8 inches and larger and plug valves 5 inches and larger.
Provide chain-operated sheaves and chains for overhead valves installed over 5 feet above finished floor.
3. Valve Identification: Manufacturer's name (or trademark) and pressure rating clearly marked on valve body.
B. Valves in Insulated Piping: With 2-inch stem extension and following features:
1. Ball Valves: With extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation and memory stops that are fully adjustable after insulation is applied. a. Basis of Design Product: Subject to compliance with requirements. Provide NIBCO NIB-SEAL handle extension or comparable product by one of the following. 1) Conbraco Industries, Inc. (Apollo Div.)
C. Valve-End Connections:
1. Flanged: With flanges according to ASME B16.1 for iron valves, ASME B16.5 for steel valves.
2. Solder Joint: With sockets according to ASME B16.18.
3. Threaded: With thread according to ASME B1.20.1.
D. Valve Bypass and Drain Connections: MSS SP-45.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 816
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR HVAC PIPING 23 05 23-3
2.3 BALANCING VALVES
A. Maximum 125 PSIG System Working Water Pressure.
B. Manual Set Balancing Valves:
1. Valves are to be of the "Y" pattern, equal percentage globe-style and provide three functions:
a. Precise flow measurement.
b. Precision flow balancing.
c. Positive drip-tight shutoff.
2. Valve to provide multi-turn, 360 degree adjustment with micrometer type indicators located on the valve handwheel. Valves have a minimum of four full 360 degree handwheel turns. 90 degree style ball valves are not acceptable. Valve handle to have hidden memory feature, which will provide a means for locking the valve position after the system is balanced. Valves to be furnished with precision machined venturi built into the valve body to provide highly accurate flow measurement and flow balancing. The Venturi to have two 1/4-inch threaded brass metering ports with check valves and gasketed caps located on the inlet side of the valve. The valve body, stem and plug to be brass. The handwheel to be high-strength resin.
3. 2-1/2-Inches and Larger: Valve body to be either cast iron with integrated cast iron flanges (2-1/2-inch to 12-inch) or ductile iron with industrial standard grooved ends (2- 1/2-inch to 12-inch). Valve stem and plug disc to be bronze with handwheel that permits multi-turn adjustments. Sizes 2-1/2-inch and 3-inch: five turns; sizes 4-inch to 6-inch: 6 turns; sizes 8-inch to 10-inch: 12 turns; and size 12-inch: 14 turns. Provide flange adapters to prevent rotation.
C. Automatic Balance Valve:
1. 1/2-Inch and Larger: Construction and attachment style as required by piping system.
Internal working parts and removable flow cartridge to be stainless steel. Valves be factory set and automatically limit flow to specified capacities with 5 percent plus or minus accuracy over entire operating pressure differential.
2.4 BALL VALVES
A. Ball valves on brazed piping are to be three-piece.
B. 2-1/2-Inches and Smaller: MSS SP-110, 400-600 PSI, two-piece full port ball configuration, bronze body, extended soldered ends for copper pipe and threaded ends for iron pipe, lead-free brass or stainless steel ball, lead-free brass stem, Teflon seat, extended steel handle. Apollo 77CLF 100 Series two-piece.
C. 3-Inches and Larger: MSS SP-110, 400-600 PSI, three-piece full port ball configuration, bronze body, extended soldered ends for copper pipe and threaded ends for iron pipe, lead-free brass or stainless steel ball, lead-free brass stem, Teflon seat, extended steel handle. Apollo 82- 100/82A 140 Series three-piece.
D. Full Port Ball Valve: 2- to 4-inch ductile iron, ASTM A536, micro finish steel chrome plated or stainless steel ball and stem. TFE seats, 600 PSI.
PART 3 - EXECUTION
3.1 GENERAL VALVE INSTALLATION REQUIREMENTS
A. Prepare valves for shipping as follows:
1. Protect internal parts against rust and corrosion.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 817
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR HVAC PIPING 23 05 23-4
2. Protect threads, flange faces, and weld ends.
3. Set angle valves closed to prevent rattling.
4. Set ball open to minimize exposure of functional surfaces.
5. Block check valves in either closed or open position.
B. Inspect the shipping container before unpacking to look for damage that could have occurred during transport, and report it to the transportation company immediately. After visual inspection, remove the valve from the shipping container. Make sure the faces are free of any scratches and that there is not any obvious damage to the actuator assembly or valve body.
C. Make sure to note the valve's model number during the unpacking process. The model number will need to be provided when purchasing replacement parts.
D. Use the following precautions during storage:
1. Maintain valve end protection.
2. Store valves indoors and maintain at higher than ambient dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.
E. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.
F. Do not attempt to repair defective valves; replace with new valves.
G. Install valves per manufacturer's recommendations.
H. Install valves where required for proper operation of piping and equipment, including valves in branch lines where necessary to isolate sections of piping. Locate valves so as to be accessible and so that separate support can be provided when necessary.
I. Purge and clean piping to be connected to valve.
J. Install valves with stems pointed up, in vertical position where possible, but in no case with stems pointed downward from horizontal plane unless unavoidable. Install valve drains with hose end adapter and cap on chain for each valve that must be installed with stem below horizontal plane. Ensure installation provides full stem movement.
K. Determine that the valve and its piping is adequately supported when installed. If a valve is not adequately supported, this could prevent the valve from operating and sealing correctly. Be sure that mating flanges are in line and parallel to minimize straining on joints and valve body.
L. Insulation: Where insulation is indicated, install extended stem valves, arranged in proper manner to receive insulation.
M. Mechanical Actuators: Install with chain operators where indicated. Extend chains to 5-feet above floor and hook to clips to clear aisle passage.
N. Stem Selection: Outside screw and yoke stems, except provide inside screw, nonrising stem where space prevents full opening of OS&Y valves.
O. Seats: Renewable seats, except where otherwise indicated.
P. When soldering, use paste flux that is approved by the manufacturer for use with lead-free alloys.
Q. Valve Adjusting and Cleaning:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 818
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
GENERAL-DUTY VALVES FOR HVAC PIPING 23 05 23-5
1. Inspect valves for leaks. Adjust or replace packing to stop leaks. Replace valve if leak persists.
2. Valve Identification: Tag valves per Section 23 05 53, Identification for HVAC Piping, Ductwork and Equipment.
R. General Requirements for Valve Applications:
1. If valve applications are not indicated, use the following:
a. Shutoff Service: Ball valves.
b. Throttling Service: Balancing valves.
c. Pump-Discharge Check Valves:
1) 2 Inches and Smaller: Swing or spring-loaded lift check valves with bronze disc.
2) 2-1/2 Inches and Larger: Swing check valves with lever and weight or with spring or wafer - seat check valves.
d. Provide isolation valve, check valve, automatic flow control valve and balancing valve on discharge side of pumps where indicated. Combination triple duty valves not allowed. Provide isolation valve and strainer on suction side of pump.
2. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP classes or CWP ratings may be substituted.
3. Valves, except wafer types, with the following end connections. a. For Copper Tubing 2-Inches and Smaller: Threaded ends. b. For Copper Tubing 2-1/2-Inches to NPS 4-Inches: Flanged ends. c. For Copper Tubing 5-Inches and Larger: Flanged ends. d. For Steel Piping 2-Inches and Smaller: Threaded ends. e. For Steel Piping 2-1/2-Inches to NPS 4-Inches: Flanged ends. f. For Steel Piping 5-Inches and Larger: Flanged ends.
3.2 BALANCING VALVES INSTALLATION
A. See General Installation Requirements above.
B. Install with flow in the direction of the arrow on the valve body and install at least five pipe diameters downstream from any fitting, and at least ten pipe diameters downstream from any pump. Two pipe diameters downstream from the balancing valve should be free of any fittings.
When installed, easy and unobstructed access to the valve handwheel and metering ports for adjustment and measurement are to be provided. Install devices in accordance with manufacturer's recommendations to automatically balance flow in piping loops as indicated.
C. For venturi valves less than 1-1/2-inch pipe size, provide valve sized for flow to coil. Provide transitions on both inlet and outlet of valve if valve is less than line size.
3.3 BALL VALVES INSTALLATION
A. See General Installation Requirements above.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 819
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-1
SECTION 23 05 29
HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTWORK AND EQUIPMENT PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Hangers and Supports for HVAC Piping, Ductwork and Equipment
2. Building Attachments
3. Flashing
4. Miscellaneous Metal and Materials
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. ASCE 7-16, Minimum Design Loads for Buildings and Other Structures.
2. Terminology: As defined in MSS SP-90 "Guidelines on Terminology for Pipe Hangers and Supports".
3. Install ductwork and piping per SMACNA's requirements.
4. Hanger spacing installation and attachment to meet all manufacturer's requirements and MSS SP-58.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Welding:
a. Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."
2. Welding for Hangers:
a. Qualify procedures and personnel according to AWS D9.1, Sheet Metal Welding Code for duct joint and seam welding.
3. Engineering Responsibility:
a. Design and preparation of Shop Drawings and calculations for each multiple pipe support, trapeze, duct support, equipment hangers/supports, support from floor structure, roof structure or from structure above, and seismic restraint by a qualified Structural Professional Engineer.
1) Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where project is located and who is October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 820
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-2
experienced in providing engineering services of the kind indicated.
Engineering services are defined as those performed for installations of hangers and supports that are similar to those indicated for this Project in material, design, and extent.
4. Manufacturers regularly engaged in the manufacture of bolted metal framing support systems, whose products have been in satisfactory use in similar service for not less than 10 years.
5. Support systems to be supplied by a single manufacturer.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 PERFORMANCE REQUIREMENTS
A. Provide pipe, ductwork and equipment hangers and supports in accordance with the following:
1. When supports, anchorages, and seismic restraints for equipment, and supports, anchorages, and seismic restraints for conduit, piping, and ductwork are not shown on the Drawings, the contractor is responsible for their design.
2. Connections to structural framing not to introduce twisting, torsion, or lateral bending in the framing members. Provide supplementary steel as required.
B. Engineered Support Systems:
1. Support frames such as pipe racks or stanchions for piping, ductwork, and equipment which provide support from below.
2. Equipment, ductwork and piping support frame anchorage to supporting slab or structure.
C. Provide channel support systems, for piping to support multiple pipes capable of supporting combined weight of supported systems, system contents, and test water.
D. Provide heavy-duty steel trapezes for piping to support multiple pipes capable of supporting combined weight of supported systems, system contents, and test water.
E. Provide seismic restraint hangers and supports for piping, ductwork and equipment. See Section 23 05 48, Vibration and Seismic Controls for HVAC Equipment.
F. Obtain approval from AHJ for seismic restraint hanger and support system to be installed for piping and equipment. See Section 23 05 48, Vibration and Seismic Controls for HVAC Equipment.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Hangers and Supports for HVAC Piping, Ductwork and Equipment:
1. Anvil International
2. B-Line Systems, Inc.
3. Erico Company, Inc.
4. Nelson-Olsen Inc.
5. Rilco Manufacturing Company, Inc.
6. Snappitz Thermal Pipe Shield Manufacturing
7. Unistrut Corporation
B. Building Attachments:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 821
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-3
1. Anchor-It
2. Gunnebo Fastening Corporation
3. Hilti Corporation
4. ITW Ramset/Red Head
5. Masterset Fastening Systems, Inc.
2.2 HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTWORK AND EQUIPMENT A. Hanger Rods: Hanger rods continuously threaded or threaded ends only in concealed spaces and threaded ends only in exposed spaces; finish electro-galvanized or cadmium-plated in concealed spaces and prime painted in exposed spaces; sizes per MSS.
B. Hanger Rod Couplings: Anvil Figure 136, B-Line Figure B3220, or approved equivalent; malleable iron rod coupling with elongated center sight gap for visual inspection; to have same finish as hanger rods.
C. Channel Hanging System:
1. Framing members No. 12 gauge formed steel channels, 1-5/8-inch square, conforming to ASTM A1011 Grade 33, one side of channel to have a continuous slot within turned lips; framing nut with grooves and spring 1/2-inch size, conforming to ASTM 675 GR60; screws conforming to ASTM A307; fittings conforming to ASTM A575; parts enamel painted or electro-galvanized.
2. Concrete Inserts: Malleable iron body, hot dipped galvanized finish. Lateral adjustment.
MSS Type 18.
D. Continuous Concrete Insert: Steel construction, minimum 12 gauge. Electrogalvanized finish.
Pipe clamps and insert nuts to match.
E. Pipe Hangers:
1. Pipe Rings for Hanger Rods:
a. Pipe Sizes 2-inches and Smaller: Adjustable swivel ring hanger, UL listed. Erico 100 or 101, Anvil Figures 69 or 104, or approved equivalent. b. Pipe Sizes 2-1/2-inches and Larger: Clevis type hangers with adjustable nuts on rod, UL listed. Anvil figure 260, Erico 400, or approved equivalent. c. Pipe hangers to have same finish as hanger rods.
F. Pipe Saddles and Shields:
1. Factory fabricated saddles or shields under piping hangers and supports for insulated piping.
2. Size saddles and shields for exact fit to mate with pipe insulation. 1/2 round, 18 gauge, minimum 12-inches in length (4-inch pipe and larger to be three times longer than pipe diameter).
G. Riser Clamps: Steel, UL listed. MSS Type 8. Erico 510 or 511. Copper coated; Erico 368.
H. Pipe Slides: Anvil, reinforced Teflon slide material (3/32-inch minimum thickness) bonded to steel; highly finished steel or stainless steel contact surfaces to resists corrosion; 60-80 PSI maximum active contact surface loading; steel parts 3/16-inch minimum thickness; attachment to pipe and framing by welding.
I. Pipe Guides:
1. Furnish and install pipe guides on continuous runs where pipe alignment must be maintained. Minimum two on each side of expansion joints, spaced per manufacturer's recommendations for pipe size. Fasten guides securely to pipe and structure. Contact October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 822
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-4
with chilled water pipe not to permit heat to be transferred in sufficient quantity to cause condensation on any surface.
2. Furnish and install guides approximately four pipe diameters (first guide) and 14 diameters (second guide) away from each end of expansion joints. Guides are not to be used as supports and are in addition to other pipe hangers and supports.
J. Pipe Roller Hangers: Adjustable roller hanger. Black steel yoke, cast iron roller. MSS Type 41.
K. Below Ground Pipe Supports:
1. Pipe Hangers All Sizes: Adjustable Clevis type, Federal Specification WW-H-171 (Type 1), UL listed, stainless steel Type 304. MSS Type 1. Erico 406.
2. Rod: 5/8-inch stainless steel Type 18-8.
3. Eyebolt: Stainless steel Type 18-8.
4. Nuts and Washers: Stainless steel Type 18-8.
L. Thermal Hanger Shield Inserts:
1. 100-PSI (690-kPa) minimum compressive strength calcium silicate insulation, encased in sheet metal shield or polyisocyanurate rigid foam exceeding the load bearing weight of the pipe at the hanger point with a PVC vapor barrier.
2. Material for Cold Piping: Water-repellent-treated, ASTM C533, Type I calcium silicate with vapor barrier or polyisocyanurate rigid foam with a PVC vapor barrier.
3. Material for Hot Piping: Water-repellent-treated ASTM C533, Type 1 calcium silicate or polyisocyanurate rigid foam with a PVC vapor barrier.
4. For Trapeze or Clamped System: Insert and shield cover entire circumference of pipe.
5. For Clevis or Band Hanger: Insert and shield cover lower 180 degrees of pipe.
6. Insert Length: Extend 2-inches beyond sheet metal shield for piping operating below ambient air temperature.
7. Thermal Hanger Shield Insulation Operating Temperature: Meet or exceed fluid temperature in pipe.
M. Freestanding Roof Supports: Polyethylene high-density UV resistant quick "pipe" block with foam pad.
2.3 BUILDING ATTACHMENTS
A. Beam Clamps:
1. MSS Type 19 and 23, wide throat, with retaining clip.
2. Universal Side Beam Clamp: MSS Type 20.
B. Powder-Actuated Drive Pin Fasteners: Powder actuated type, drive pin attachments with pull- out and shear capacities appropriate for supported loads and building materials where used.
C. Anchor Bolts:
1. Anchor supports to existing masonry, block and tile walls per anchoring system manufacturer's recommendations or as modified by project structural engineer. Insert- type attachments with pull-out and shear capacities appropriate for supported loads and building materials where used.
2. Anchor Bolts (Cast-In-Place): Steel bolts, ASTM A307. Nuts to conform to ASTM A194.
Design values for shear and tension not more than 80 percent of the allowable listed loads.
3. Anchor (Expansion) Bolts: Carbon steel to ASTM A307; nut to conform to ASTM A194; drilled-in type. Design values for shear and tension not more than 80 percent of the allowable listed loads.
4. Anchor (Adhesive) Bolts: Consisting of two-part adhesive cartridge and zinc-plated Type A307 steel anchor bolt rod assembly with ASTM A194 nut.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 823
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-5
2.4 FLASHING
A. Steel Flashing: 26 gauge galvanized steel.
B. Safes: 8 mil thick neoprene.
C. Caps: Steel, 22 gauge minimum, 16 gauge at fire-resistant structures.
2.5 MISCELLANEOUS METAL AND MATERIALS
A. General:
1. Provide miscellaneous supports and metal items, including materials, fabrication, fastenings and accessories required for finished installation, where indicated on drawings or otherwise not shown on drawings that are necessary for completion of the project.
Contractor is responsible for their design.
2. Fabricate miscellaneous units to size shapes and profiles indicated or, if not indicated, of required dimensions to receive adjacent other work to be retained by framing. Except as otherwise shown, fabricate from structural steel shapes and plates and steel bars, of welded construction using mitered joints for field connection. Cut, drill and tap units to receive hardware and similar items.
B. Structural Shapes: Where miscellaneous metal items are needed to be fabricated from structural steel shapes and plates, provide members constructed of steel conforming with requirements of ASTM A36 or approved equivalent.
C. Steel Pipe: Provide seamless steel pipe conforming to requirements of ASTM A53, Type S, Grade A, or Grade B. Weight and size required as specified.
D. Fasteners: Provide fasteners of types as required for assembly and installation of fabricated items; surface-applied fasteners are specified elsewhere.
E. Bolts: Low carbon steel externally and internally threaded fasteners conforming with requirements of ASTM A307; include necessary nuts and plain hardened washers. For structural steel elements supporting mechanical material or equipment from building structural members or connection thereto, use fasteners conforming to ASTM A325.
F. Miscellaneous Materials: Provide incidental accessory materials, tools, methods, and equipment required for fabrication.
G. Provide hot dipped galvanized components for items exposed to weather. Cold galvanize field- welded joints and components. Use materials compatible with system being supported (i.e. aluminum for aluminum ductwork, stainless steel for stainless steel ductwork).
H. Use straps, threshold rods and wire with sizes required by SMACNA to support ductwork.
I. Grout:
1. ASTM C1107, Grade B, factory mixed and packaged, nonshrink and nonmetallic, dry, hydraulic-cement grout.
2. Characteristics: Post hardening and volume adjusting; recommended for both interior and exterior applications.
3. Properties: Nonstaining, noncorrosive, and non gaseous.
4. Design Mix: 5000-PSI (34.5-MPa), 28-day compressive strength.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 824
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-6
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Verify building materials to have hangers and attachments affixed in accordance with hangers to be used. Provide supporting calculations.
B. Examine Drawings and coordinate for verification of exact locations of fire and smoke rated walls, partitions, floors and other assemblies. Indicate, by shading and labeling on Record Drawings such locations and label as "1-Hour Wall," "2-Hour Fire/Smoke Barrier," and the like.
Determine proper locations for piping penetrations. Set sleeves in place in new floors, walls or roofs prior to concrete pour or grouting.
C. Install hangers, supports, anchors and sleeves after required building structural work has been completed in areas where the work is to be installed. Coordinate proper placement of inserts, anchors and other building structural attachments.
D. Equipment Clearances: Do not route ductwork, equipment, or piping through electrical rooms, transformer vaults, elevator equipment rooms, IT rooms, MPOE rooms, or other electrical or electronic equipment spaces and enclosures and the like. Within equipment rooms, provide minimum 3-feet lateral clearance from all sides of electric switchgear panels. Do not route ductwork, equipment, or piping above any electric power or lighting panel, switchgear, or similar electric device. Coordinate with Electrical and coordinate exact ductwork, equipment or pipe routing to provide proper clearance with such items.
3.2 HANGERS AND SUPPORTS FOR HVAC PIPING, DUCTWORK AND EQUIPMENT A. Hang rectangular sheet-metal ducts with a cross sectional area of less than 7 SF with galvanized strips of No. 16 USS gauge steel 1-inch wide, and larger ducts with steel angles and adjustable hanger rods similar to piping hangers. Support at a maximum of 8-feet on center.
B. Support horizontal ducts within 24-inches of each elbow and within 48-inches of each branch intersection.
C. Design hangers and supports to allow for expansion and contraction.
D. Provide aluminum supports for aluminum ductwork.
E. Provide stainless steel supports for stainless steel ductwork.
F. Support vertical ducts at maximum intervals of 16-feet and at each floor.
G. Install upper attachments to structures with an allowable load not exceeding one-fourth of failure (proof-test) load.
H. Install flexible ductwork per the more stringent of SMACNA HVAC Duct Construction Standards or the following:
1. Support horizontal duct runs at not more than 4 feet intervals.
2. Support vertical risers at not more than 6 feet intervals.
3. Limit sag between support hangers to 1/2-inch per foot of spacing support.
4. Supports shall be rigid and shall be not less than 1.5-inches wide at point of contact with the duct surface.
5. Duct bends shall be not less than 1.5 duct diameter bend radius.
I. Use double nuts and lock washers on threaded rod supports.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 825
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-7
J. Floor supports in mechanical rooms to be elevated 1-inch above finish floor and void space filled with masonry grout.
K. Anchor ducts securely to building in such a manner as to prevent transmission of vibration to structure. Do not connect duct hanger straps directly to roof deck. Do not support ducts from other ducts, piping or equipment.
L. Attach strap hangers installed flush with end of sheet-metal duct run to duct with sheet-metal screws.
M. Construct exterior ductwork or ductwork which is otherwise exposed to weather watertight and slope 1/4-inch per foot to avoid standing water.
N. Exposed ductwork hung in clean areas such as sanitary areas, pharmaceutical areas, wash down areas or food process areas to be installed using double end, food grade trapeze hanger rods suitable for use with food grade strut.
O. Channel Support System Installation:
1. Arrange for grouping of parallel runs of piping and support together on field-assembled channel systems.
2. Field assemble and install according to manufacturer's written instructions.
P. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers, and other accessories.
Q. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
R. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
S. Adjust hangers so as to distribute loads equally on attachments. Provide grout under supports to bring piping, ductwork and equipment to proper level and elevations.
T. Prime paint ferrous nongalvanized hangers, accessories, and supplementary steel which are not factory painted.
U. Horizontal Piping Hangers and Supports; Horizontal and Vertical Piping, and Hanger Rod Attachments:
1. Factory fabricated horizontal piping hangers and supports complying with MSS SP-58, to suit piping systems and in accordance with manufacturer's published product information.
2. Use only one type by one manufacturer for each piping service.
3. Select size of hangers and supports to exactly fit pipe size for bare piping, and to exactly fit around piping insulation with saddle or shield for insulated piping.
4. Pipe support spacing (pipe supported in ceiling or floor-supported) to meet latest applicable Code and manufacturer's requirements.
5. Provide copper-plated hangers and supports for uninsulated copper piping systems.
V. Plumber's Tape not permitted as pipe hangers or pipe straps.
W. Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure. For horizontally hung grooved-end piping, provide a minimum of 2 hangers per pipe section.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 826
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-8
X. Pipe Ring Diameters:
1. Uninsulated and Insulated Pipe, Except Where Oversized Pipe Rings are Specified: Ring inner diameter to suit pipe outer diameter.
2. Insulated Piping Where Oversized Pipe Rings are Specified and Vibration Isolating Sleeves: Ring inner diameter to suit outer diameter of insulation or sleeve.
Y. Oversize Pipe Rings: Provide oversize pipe rings of 2-inch and larger size.
Z. Pipe Support Brackets: Support pipe with pipe slides.
AA. Steel Backing in Walls: Provide steel backing in walls to support fixtures and piping hung from steel stud walls.
BB. Pipe Guides:
1. Install on continuous runs where pipe alignment must be maintained. Minimum two on each side of expansion joints, spaced per manufacturer's recommendations for pipe size.
Fasten guides to pipe structure. Contact with chilled water pipe does not permit heat to be transferred in sufficient quantity to cause condensation on any surface.
2. Install approximately four pipe diameters (first guide) and 14 diameters (second guide) away from each end of expansion joints. Do not use as supports. Provide in addition to other required pipe hangers and supports.
CC. Heavy-Duty Steel Trapeze Installation:
1. Arrange for grouping of parallel runs of horizontal piping and support together on field fabricated, heavy-duty trapezes.
2. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified above for individual pipe hangers.
3. Field fabricate from ASTM A 36/A 36M, steel shapes selected for loads being supported.
Weld steel according to AWS D-1.1.
DD. Group parallel runs of horizontal piping to be supported together on trapeze-type hangers.
Maximum spacings: MSS SP-58.
EE. Where piping of various sizes is to be supported together by trapeze hangers, space hangers for smallest pipe size or install intermediate supports for smaller diameter pipe.
FF. Do not support piping from other piping.
GG. Fire protection piping will be supported independently of other piping.
HH. Prevent electrolysis in support of copper tubing by use of hangers and supports which are copper plated.
II. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so maximum pipe deflections allowed by ASME B31.9, "Building Services Piping" is not exceeded.
JJ. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Piping Operating Above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating Below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
2. Do not exceed pipe stress limits according to ASME B31.9.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 827
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-9
3. Install MSS SP-58, Type 39 protection saddles, if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
4. Install MSS SP-58, Type 40 protective shields on cold piping with vapor barrier. Shields to span arc of 180 degrees.
5. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 (DN100) and larger if pipe is installed on rollers.
6. Shield Dimensions for Pipe, not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN8 to DN 90): 12-inches long and 0.048-inch thick. b. NPS 4 (DN100): 12-inches long and 0.06-inch thick.
c. NPS 5 and NPS 6 (DN125 and DN150): 18-inches long and 0.06-inch thick. d. NPS 8 to NPS 14 (DN200 to DN350): 24-inches long and 0.075-inch thick. e. NPS 16 to NPS 24 (DN400 to DN600): 24-inches long and 0.105-inch thick.
7. Pipes NPS 8 (DN200) and Larger: Include wood inserts. a. Insert Material: Length at least as long as protective shield.
8. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
KK. Escutcheon Plates: Install around horizontal and vertical piping at visible penetrations through walls, partitions, floors, or ceilings, including penetrations through closets, through below ceiling corridor walls, and through equipment room walls and floors.
3.3 BUILDING ATTACHMENTS
A. Factory fabricated attachments complying with MSS SP-58, selected to suit building substructure conditions and in accordance manufacturer's published product information.
B. Select size of building attachments to suit hanger rods.
C. Space attachments within maximum piping span length indicated in MSS SP-58.
D. Install building attachments within concrete slabs or attach to structural steel or wood. Install additional building attachments where support is required for additional concentrated loads, including valves, flanges, guides, strainers, expansion joints, and at changes in direction of piping.
E. Attachment to Wood Structure: Anvil side beam bracket Figure 202 for attachment to wooden beam or approved attachment for a wood structure.
F. Install mechanical-anchor fasteners in concrete after concrete is placed and completely cured.
Install fasteners according to manufacturer's written instructions.
G. Install concrete inserts before concrete is placed; fasten inserts to forms. Where concrete with compressive strength less than 2500 PSI is indicated, install reinforcing bars through openings at top in inserts.
H. Install powder-actuated drive-pin fasteners in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual. Test powder-actuated insert attachments with a minimum load of 100 pounds.
I. Do not use powder-actuated concrete fasteners for lightweight aggregate concretes or for slabs less than 4-inches thick.
J. Bolting: Provide bored, drilled or reamed holes for bolting to miscellaneous structural metals, frames or for mounts or supports. Flame cut, punched or hand sawn holes will not be accepted.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 828
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-10
K. Anchor Bolts:
1. Install anchor bolts for mechanical equipment, piping and ductwork as required. Tightly fit and clamp base-supported equipment anchor bolts at equipment support points. Provide locknuts where equipment, piping and ductwork are hung.
2. Anchor Bolts (Cast-In-Place): Embed anchor bolts in new cast-in-place concrete to anchor equipment. Install a pipe sleeve around the anchor bolt for adjustment of the top 1/3 of the bolt embedment; sizes and patterns to suit the installation conditions of the equipment to be anchored.
3.4 FLASHING
A. Flash and counterflash where piping, ductwork and equipment passes through weather or waterproofed walls, floors, and roofs.
B. Provide 12-inch minimum height curbs for roof-mounted mechanical equipment. Flash and counter flash with galvanized steel, soldered and waterproofed.
3.5 MISCELLANEOUS METAL AND MATERIALS
A. General: Verify dimensions prior to fabrication. Form metal items to accurate sizes and configurations as indicated on drawings and otherwise required for proper installation; make with lines straight and angles sharp, clean and true; drill, countersink, tap, and otherwise prepare items for connections with work of other trades, as required. Fabricate to detail of structural shapes, plates and bars; weld joints where practicable; provide bolts and other connection devices required. Include anchorages; clip angles, sleeves, anchor plates, and similar devices. Hot dipped galvanize after fabrication items installed in exterior locations. Set accurately in position as required and anchor securely to building construction. Construct items with joints formed for strength and rigidity, accurately machining for proper fit; where exposed to weather, form to exclude water.
B. Finishes:
1. Ferrous Metal: After fabrication, but before erection, clean surfaces by mechanical or chemical methods to remove rust, scale, oil, corrosion, or other substances detrimental to bonding of subsequently applied protective coatings. For metal items exposed to weather or moisture, galvanize in manner to obtain G90 zinc coating in accordance with ASTM A123. Provide other non-galvanized ferrous metal with 1 coat of approved rust-resisting paint primer, in manner to obtain not less than 1.0 mil dry film thickness. Touch-up damaged areas in primer with same material, before installation. Apply zinc coatings and paint primers uniformly and smoothly; leave ready for finish painting as specified elsewhere.
2. Metal in Contact with Concrete, Masonry and Other Dissimilar Materials: Where metal items are to be erected in contact with dissimilar materials, provide contact surfaces with coating of an approved zinc-chromate primer in manner to obtain not less than 1.0 mil dry film thickness, in addition to other coatings specified in these specifications.
3. For Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and apply galvanizing repair paint to comply with ASTM A780.
C. Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions, and directions for installation of anchorages, such as concrete inserts, sleeves, anchor bolts and miscellaneous items having integral anchors, which are to be embedded in concrete or masonry construction. Coordinate delivery of such items to project site.
D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where necessary for securing miscellaneous metal fabrications to in-place construction; including, threaded fasteners for concrete and masonry inserts, toggle bolts, through-bolts, lag bolts, wood screws October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 829
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HANGERS AND SUPPORTS FOR HVAC PIPING,
DUCTWORK AND EQUIPMENT 23 05 29-11
and other connectors as required. Avoid cutting concrete reinforcing when drilling for inserts.
Reference structural drawings and reinforcing shop drawings and determine locations of stirrups prior to drilling into concrete.
E. Cutting, Fitting and Placement: Perform cutting, drilling and fitting required for installation of miscellaneous metal fabrications. Set work accurately in location, alignment and elevation, plumb, level, true and free of rack, measured from established lines and levels. Provide temporary bracing or anchors in formwork for items, which are to be built into concrete masonry or similar construction.
F. Field Welding: Comply with AWS Code for procedures of manual shielded metal-arc welding, appearance and quality of welds made, and methods used in correcting welding work.
G. Setting Loose Plates: Clean concrete and masonry bearing surfaces of any bond reducing materials, and roughen to improve bond to surfaces. Clean bottom surface of bearing plates.
H. Set loose leveling and bearing plates on wedges, or other adjustable devices. After the bearing members have been positioned and plumbed, tighten the anchor bolts. Do not remove wedges or shims, but if protruding, cut-off flush with edge of the bearing plate before packing with grout.
Use metallic non-shrink grout in concealed locations where not exposed to moisture; use non- metallic non-shrink grout in exposed locations, unless otherwise indicated.
I. Pack grout solidly between bearing surfaces and plates to ensure that no voids remain.
J. Cut, drill, and fit miscellaneous metal fabrications for heavy-duty steel trapezes and equipment supports.
K. Fit exposed connections together to form hairline joints. Field-weld connections that cannot be shop-welded because of shipping size limitations.
L. Field Welding: Comply with AWS D1.1 procedures for shielded metal arc welding, appearance and quality of welds, and methods used in correcting welding work, and with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and contours of welded surfaces match adjacent contours.
M. Provide galvanized components for items exposed to weather.
3.6 FIRE RATED SUPPORTS
A. Provide fire rated support as required by Codes.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 830
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-1
SECTION 23 05 48
VIBRATION AND SEISMIC CONTROLS FOR HVAC EQUIPMENT
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Vibration Isolation
2. Seismic Restraint Devices
3. Factory Finishes
4. Seismic-Bracing/Restraint Devices/Systems for Equipment, Piping and Ductwork B. General:
1. Vibration isolation for mechanical ductwork, piping and equipment.
2. Seismic restraint for mechanical ductwork, piping and equipment.
3. Seismic Certification for equipment, hangers and systems.
4. Special inspections for systems.
C. Scope of Work:
1. Vibration isolation and seismic restraint of new equipment and systems within project boundary defined in architectural drawings.
2. Vibration isolation and seismic restraint of new equipment and systems in existing buildings to points of connection with existing systems.
3. Seismic restraint of existing systems and equipment shown on Drawings, within project boundary defined in architectural drawings.
4. Provide supplementary structural steel for seismic restraint systems. No hanging from roof deck is permitted on this project, unless specifically allowed by Structural Engineer of Record in writing prior to bid.
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Vibration Isolation:
a. Product Data: Provide catalog data indicating size, type, load and deflection of each isolator; and percent of vibration transmitted based on lowest disturbing frequency of equipment.
b. Shop Drawings: Showing complete details of construction for steel and concrete bases including:
1) Fabrication, including anchorages and attachments to structure and to supported equipment. Include auxiliary motor slides and rails, base weights, October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 831
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-2
equipment static loads, power transmission, component misalignment and cantilever loads.
2) Equipment mounting holes.
3) Dimensions.
4) Size and location of concrete and steel bases and curbs. 5) Isolation selected for each support point.
6) Details of mounting brackets for isolator.
7) Weight distribution for each isolator.
8) Details of seismic snubbers.
9) Code number assigned to each isolator.
c. Design calculations: Provide calculations for selecting vibration isolators and for designing vibration isolation bases.
2. Riser Supports: Include riser diagrams and calculations showing anticipated expansion and contraction at each support point, initial and final loads on building structure, spring deflection changes and seismic loads. Include certification that riser system has been examined for excessive stress and that none will exist.
3. Seismic Restraint:
a. Shop Drawings: Show compliance with requirements of Quality Assurance article of this Section. Shop drawings to be stamped by a professional Structural or Civil Engineer licensed in State of California.
b. Calculations: Submit seismic calculations indicating restraint loadings resulting from design seismic forces. Include anchorage details and indicate quantity, diameter and depth of penetration of anchors. Calculations certified by professional Structural or Civil Engineer licensed in State of California.
4. Seismic Restraint Details: Detail fabrication and attachment of seismic restraints and snubbers. Show anchorage details and indicate quantity, diameter and depth of penetration of anchors.
5. Submittals for Interlocking Snubbers: Include load deflection curves up to 1/2-inch deflection in x, y and z planes.
6. Welding certificates.
7. Equipment Certification: Provide seismic certification for equipment as noted in Seismic Design Summary or schedules on Drawings.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Vibration Isolation:
a. Except for packaged equipment with integral isolators, single manufacturer selects and furnishes isolation required.
b. Deflections indicated on drawings are minimum actual static deflections for specific equipment supported.
c. Isolator Stability:
1) Size springs of sufficient diameter to maintain stability of equipment being supported. Spring diameters not less than 0.8 of compressed height at rated load.
2) Springs have minimum additional travel to solid equal to 50 percent of rated defection.
3) Springs support 200 percent of rated load, fully compressed, without deformation or failure.
d. Maximum Allowable Vibration Levels: Peak vibration velocities not exceed 0.08 in/sec. Correct equipment operating at vibration velocities that exceed this criteria.
2. Seismic Restraint:
a. Code and Standard Requirements:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 832
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-3
1) Seismic restraint of equipment, piping and ductwork to be in accordance with latest enacted version of ASCE 7-16.
b. Confirm Seismic Control requirements in Division 01, General Requirements and Structural documents.
c. Certification: See Seismic Design Table or schedules on Drawings for equipment, systems and seismic-restraint devices designated to have seismic certification/qualification. Horizontal and vertical load testing and analysis performed according to ASCE 7-16. Anchorage systems to bear anchorage preapproval number from an agency acceptable to authorities having jurisdiction, showing maximum seismic-restraint ratings. Ratings based on independent testing or calculations, if preapproved ratings are not available. Calculations (including combining shear and tensile loads) to support seismic-restraint designs must be sealed by qualified licensed professional engineer in State of California. Testing and calculations must include both shear and tensile loads and one test or analysis at 45 degrees to weakest mode.
d. Seismic restraint and anchorage of permanent equipment and associated systems listed below to building structure be designed to resist total design seismic force prescribed in local building code:
1) Floor- or roof-mounted equipment weighing 400 pounds or greater. 2) Suspended, wall-mounted or vibration isolated equipment weighing 20 pounds or greater.
3) In-line duct devices connected to ductwork weighing 75 pounds or greater. 4) Housekeeping slabs: provide reinforcement and anchorage to building structure.
e. Where required, seismic sway bracing of suspended duct and piping meet following:
1) Pipe and duct runs requiring seismic bracing have minimum of two traverse braces and one longitudinal brace. Longitudinal (or traverse) brace at 90 degree change in direction may act as traverse (or longitudinal) brace if located within 2-feet of change in direction.
2) Seismic bracing may not pass through seismic separation joint. Pipe or duct runs that pass through seismic separation joint must be restrained within 5- feet of both sides of separation.
3) Seismic brace assembly spacing not to exceed 40-feet transverse and 80- feet longitudinal.
f. Seismic restraints may be omitted from suspended piping and duct if following conditions are satisfied:
1) For piping or ducts supported by rod hangers 12-inches or less in length from top of duct to bottom of structural support. Top connections to structure have swivel joints, eye bolts, or vibration isolation hangers for entire length of system run.
2) Lateral motion of system will not cause damaging impact with surrounding systems or cause loss of system vertical support.
3) System must be welded steel pipe, brazed copper pipe, sheet metal duct or similar ductile material with ductile connections.
C. Seismic restraints, including anchors to building structure, be designed by registered professional Structural or Civil Engineer licensed in State of California. Design includes:
1. Number, size, capacity and location of anchors for floor- or roof-mounted equipment. For curb-mounted equipment, provide design of attachment of both unit to curb and curb to structure.
2. Number, size, capacity and location of seismic restraint devices and anchors for vibration-isolation and suspended equipment. Provide calculations and test data verifying horizontal and vertical ratings of seismic restraint devices.
3. Number, size, capacity and location of braces and anchors for suspended piping and ductwork on as-built plan drawings.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 833
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-4
4. Maximum seismic loads to be indicated on drawings at each brace location. Drawings bear stamp and signature of registered professional Structural or Civil Engineer who designed layout of braces.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
B. Seismic Snubber Units: Furnish replacement neoprene inserts for snubbers.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Vibration Isolation:
1. Kinetics Noise Control, Inc.
2. Mason Industries, Inc.
3. M.W. Saussé - Vibrex
4. Where Mason numbers are specified, equivalent products by listed manufacturers are acceptable.
B. Seismic Restraint Devices:
1. B-Line Systems, Inc.
2. Kinetics Noise Control, Inc.
3. Mason Industries, Inc.
4. M.W. Saussé - Vibrex
5. Cooper B-Line Tolco
6. Unistrut Diversified Products Co.; Wayne Manufacturing Division.
7. Hilti, Inc.
C. Factory Finishes:
1. Kynar 500 Fluoropolymer Coating
D. Seismic-Bracing/Restraint Devices/Systems for Equipment, Piping and Ductwork:
1. Kinetics Noise Control, Inc.
2. Mason Industries, Inc.
3. Hilti, Inc.
4. Cooper B-Line, Inc.
5. Unistrut
6. ISAT, Inc.
7. Where Mason numbers are specified, equivalent products by listed manufacturers are acceptable.
2.2 VIBRATION ISOLATION
A. Type 4A - Restrained Spring Isolators: Freestanding, steel, open-spring isolators with seismic restraint.
1. Housing: Steel with resilient vertical-limit stops (out of contact during normal operation) to prevent spring extension due to wind loads or if weight is removed; factory-drilled October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 834
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-5
baseplate bonded to 1/4-inch thick, natural rubber or bridge bearing neoprene isolator pad attached to baseplate underside; and adjustable equipment mounting and leveling bolt that acts as blocking during installation. Restraining bolts have large rubber grommets to provide cushioning in vertical and horizontal directions. A minimum clearance of 3/8-inch maintained around restraining bolts so as not to interfere with spring action.
2. Outside Spring Diameter: Not less than 80 percent of compressed height of spring at rated load.
3. Minimum Additional Travel: 50 percent of required deflection at rated load.
4. Lateral Stiffness: More than 80 percent of rated vertical stiffness.
5. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.
6. Brackets: Manufacturer's standard bracket, utilize height saving brackets to accommodate height restrictions.
7. Mason Type: SLR.
B. Type 5C - Spring Hangers with Vertical-Limit Stop: Combination coil-spring and elastomeric- insert hanger with spring and insert in compression and with a vertical-limit stop.
1. Frame: Steel, fabricated for connection to threaded hanger rods and to allow for a maximum of 15 degrees of angular hanger-rod misalignment from vertical without binding or reducing isolation efficiency.
2. Outside Spring Diameter: Not less than 80 percent of compressed height of spring at rated load.
3. Minimum Additional Travel: 50 percent of required deflection at rated load.
4. Lateral Stiffness: More than 80 percent of rated vertical stiffness.
5. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.
6. Elastomeric Element: Molded, oil-resistant rubber or neoprene.
7. Adjustable Vertical Stop: Steel washer with neoprene washer "up-stop" on lower threaded rod.
8. Mason Type: RW30.
C. Type FC-1, Flexible Duct Connectors. See Specification Section 23 33 00, Air Duct Accessories.
D. Type FC-2B, Flexible Pipe Connector, Copper:
1. Inner Hose: Bronze, close pitch, annular corrugated hose.
2. Exterior Sleeve: Braided bronze (for piping over 2-inches, to be 3 pound braided stainless steel).
3. Minimum Allowable Pressure Rating: 125 PSI at 70 degrees F.
4. Joint: Sweat ends.
5. Size: Use pipe sized units.
6. Minimum Allowable Offset: 3/8-inch on each side of installed center line.
7. Basis of Design: Metraflex Model BBS.
E. Type FC-2C, Flexible Pipe Connector, Gas:
1. Inner Hose: 304 stainless steel.
2. Exterior Sleeve: Braided, 304 stainless steel.
3. Minimum Allowable Pressure Rating: 150 PSI at 70 degrees F up to 4-inch pipe.
4. Joint: Threaded carbon steel.
5. Minimum Allowable Offset: 3/4-inch on each side of installed center line.
6. Basis of Design: Metraflex GASCT.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 835
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-6
2.3 SEISMIC RESTRAINT DEVICES
A. Resilient Isolation Washers and Bushings: 1-piece, molded, bridge-bearing neoprene complying with AASHTO M 251 and having a durometer of 50, plus or minus 5, with a flat washer face.
B. Seismic Snubbers: Factory fabricated using welded structural-steel shapes and plates, anchor bolts and replaceable resilient isolation washers and bushings. Snubber load rating to match equipment size. Mason Type: Z-1011 or Z-1225.
1. Anchor bolts for attaching to concrete be seismic-rated, drill-in and stud-wedge or female- wedge type.
2. Resilient Isolation Washers and Bushings: 1-piece, molded, bridge-bearing neoprene complying with AASHTO M 251 and having a durometer of 50, plus or minus 5.
C. Restraining Cables: Galvanized steel aircraft cables with end connections made of steel assemblies that swivel to final installation angle and utilize two clamping bolts for cable engagement. Mason Type: SCB.
D. Anchor Bolts: Seismic-rated, drill-in and stud-wedge or female-wedge type. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488/E 488M.
2.4 FACTORY FINISHES
A. Provide manufacturer's standard prime-coat finish ready for field painting. Units mounted outdoors exposed to weather: Epoxy powder coated, with 1000 hour salt spray rating per ASTM B-117. For high levels of corrosion protection utilize:
1. Conform to AAMA 605.2.
2. Apply coating following cleaning and pretreatment.
3. Cleaning: AA-C12C42R1X.
4. Dry system before final finish application.
5. Total Dry Film Thickness: Approximately 1.2 mils, when baked at 450 degrees F for 10 minutes.
B. Finish:
1. Manufacturer's standard paint applied to factory-assembled and factory-tested equipment before shipping.
2. Powder coating on springs and housings.
3. Hardware be electrogalvanized. Hot-dip galvanize metal components for exterior use.
4. Baked enamel for metal components on isolators for interior use.
5. Color-code or otherwise mark vibration isolation and seismic-control devices to indicate capacity range.
2.5 SEISMIC-BRACING/RESTRAINT DEVICES/SYSTEMS FOR EQUIPMENT, PIPING AND
DUCTWORK
A. General Requirements for Restraint Components: Rated strengths, features and applications to be as defined in reports by agency acceptable to authorities having jurisdiction.
B. Structural Safety Factor: Allowable strength in tension, shear and pullout force of components be at least four times maximum seismic forces to which they will be subjected.
C. Anchor bolts for attaching to concrete to be seismic-rated, drill-in and stud-wedge or female- wedge type.
D. Resilient Isolation Washers and Bushings: Oil- and water-resistant neoprene.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 836
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-7
E. Maximum 1/4-inch air gap and minimum 1/4-inch thick resilient cushion.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Provide mounts for equipment installed outdoors for wind loads of 30 lbs. psf applied to any exposed surface of isolated equipment.
B. Do not install equipment or pipe which makes rigid contact with building slabs, beams, studs, walls, etc.
C. Anchor baseplate to floor or structure. Provide rubber grommets and washers to isolate bolt from base plate. Under no circumstances is isolation efficiency to be destroyed when bolting isolators to floor.
D. Building Penetrations: Isolate water piping and ductwork penetrating wall, ceilings, floors or shafts from structure by piping isolator or by 3/8-inch thick foamed rubber insulation. Install units flush with finished structure face, using one for each side as required. Cut units to length if longer than structure thickness. Caulk around pipe or duct at equipment room wall.
E. Provide roof curbs, equipment supports and roof penetrations. Work to maintain roof warranty.
Coordinate location, size, structural connections/requirements and flashing prior to installation.
F. Vibration isolators must not cause change of position of equipment or piping which would stress piping connections or misalignment shafts or bearings. Isolated equipment is to be level and in proper alignment with connecting ducts and pipes.
G. Pipe Hangers in Equipment Rooms: Support water and gas piping connected to rotating equipment within equipment rooms on spring and neoprene hangers. The first three hangers from a piece of vibrating equipment are to have a minimum of 1/2 static deflection of equipment isolators. Other isolators should have a minimum of 1/4 static deflection of equipment isolators.
H. Examination:
1. Examine areas and equipment to receive vibration isolation and seismic-control devices for compliance with requirements, installation tolerances and other conditions affecting performance.
2. Examine roughing-in of reinforcement and cast-in-place anchors to verify actual locations before installation.
3. Proceed with installation only after unsatisfactory conditions have been corrected.
I. Testing: Perform following field quality-control testing:
1. Isolator seismic-restraint clearance.
2. Isolator deflection.
3. Snubber minimum clearances.
J. Adjusting:
1. Adjust snubbers according to manufacturer's written recommendations.
2. Torque anchor bolts according to equipment manufacturer's written recommendations to resist seismic forces.
K. Cleaning: After completing equipment installation, inspect vibration isolation and seismic-control devices. Remove paint splatters and other spots, dirt and debris.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 837
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-8
L. Demonstration: Engage factory-authorized service representative to train Owner's maintenance personnel to adjust, operate and maintain air-mounting systems. Reference Division 01, General Requirements.
3.2 VIBRATION ISOLATION
A. Reference General Installation Requirements above.
B. Install per manufacturer's instructions and recommendations.
C. Vibration isolators must be installed in strict accordance with manufacturer's written instructions and certified submittal data.
D. Install isolation as indicated on Drawings by type and location and where indicated below.
E. Equipment Vibration Isolation Schedule:
Equipment Size Vibration Isolator Type
Minimum
Deflection
(in)
Fan-Powered Terminal Units All Type 5C, FC-1,2 0.75
Utility Set Centrifugal Fans All 4A 1.5
F. Isolation Mounts:
1. Install minimum of four seismic snubbers on isolated equipment. Locate snubbers as close as possible to vibration isolators and bolt to equipment base and supporting structure.
2. Install resilient bolt isolation washers on equipment anchor bolts.
3. Provide flexible piping connection and flexible ductwork connection to equipment with isolation mounts or bases.
G. Isolating Hangers:
1. Support piping and ductwork connected to isolated equipment within equipment rooms on isolating hangers as scheduled on drawings. Unless otherwise noted, first three hangers from isolated equipment to have a minimum of 1/2 static deflection of equipment isolators. Other isolating hangers to have a minimum of 1/4 static deflection of equipment isolators.
2. Position isolating hanger elements as high as possible in hanger rod assembly, but not in contact with building structure. Install hangers so that hanger housing may rotate full 360 degrees about rod axis without contacting any object.
3. Unless otherwise noted, air supply units with internally isolated fans do not require isolating hangers for connecting pipes and ductwork.
4. Where parallel running pipes are hung together on an isolated trapeze, provide isolator deflections for largest determined by provisions for pipe isolation. Do not mix isolated and non-isolated pipes in same trapeze.
5. Install limit stops so they are out of contact during normal operation.
H. Adjusting:
1. Adjust isolators after piping systems have been filled and equipment is at operating weight.
2. Adjust limit stops on restrained spring isolators to mount equipment at normal operating height. After equipment installation is complete, adjust limit stops so they are out of contact during normal operation.
3. Attach thrust limits at centerline of thrust and adjust to a maximum of 1/4-inch movement during start and stop.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 838
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
VIBRATION AND SEISMIC CONTROLS FOR HVAC
EQUIPMENT 23 05 48-9
3.3 SEISMIC RESTRAINT DEVICES
A. Reference General Installation Requirements above.
B. Install in strict accordance with manufacturer's written instructions and certified submittal data.
C. Install and adjust seismic restraints so equipment, piping and ductwork supports are not degraded by restraints.
D. Restraints must not short circuit vibration isolation systems or transmit objectionable vibration or noise.
E. Install restraining cables at each trapeze, individual pipe hanger and hanging vibration isolated equipment. Provide restraining cables in each of the four directions of movement. Install restraining cables no less than 45 degrees from vertical. At trapeze anchor locations, shackle piping to trapeze. Install cables so they do not bend across sharp edges of adjacent equipment or building structure.
F. Install steel angles or channel, sized to prevent buckling, clamped with ductile-iron clamps to hanger rods for trapeze and individual pipe hangers. At trapeze anchor locations, shackle piping to trapeze. Requirements apply equally to hanging equipment. Do not weld angles to rods.
3.4 FACTORY FINISHES
A. Reference General Installation Requirements above.
B. Install per manufacturer's instructions and recommendations.
C. Finishes to be factory-applied. No field patching or holidays allowed.
3.5 SEISMIC-BRACING/RESTRAINT DEVICES/SYSTEMS FOR EQUIPMENT, PIPING AND
DUCTWORK
A. Reference General Installation Requirements above.
B. Install per manufacturer's instructions and recommendations.
C. Adjust seismic restraints to permit free movement of equipment within normal mode of operation.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 839
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT 23 05 53-1
SECTION 23 05 53
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Plastic Nameplates
2. Tags
3. Plastic Pipe Markers
4. Ceiling Tags
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Schedules:
a. Submit valve schedule for each piping system, in tabular format using Microsoft Word or Excel software. Tabulate valve number, piping system, system abbreviation (as shown on tag), location of valve (room or space), and variations for identification (if any). Mark valves which are intended for emergency shutoff and similar special uses by special "flags" in margin of schedule. In addition to mounted copies, furnish extra copies for maintenance manuals. b. For renovations or expansions of existing systems, coordinate with Owner and develop valve schedule on existing schedule naming and format.
2. Submit schedule of identification type, including material, for each class of tagged item.
3. Submit locations at which Valve Schedules will be installed.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Manufacturer's Qualifications: Firms regularly engaged in manufacture of identification devices of types and sizes required.
2. Codes and Standards: Comply with ANSI A13.1 for lettering size, length of color field, colors, and viewing angles of identification devices unless otherwise indicated.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 840
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT 23 05 53-2
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 PLASTIC NAMEPLATES
A. Manufacturers:
1. Brady Corporation
2. Brimar
3. Champion America
4. Craftmark
5. Seton
B. Description: Engraving stock melamine plastic laminate in the size and thicknesses indicated, engraved with engraver's standard letter style of the sizes and wording indicated, black with white core (letter color), punched for mechanical fastening except where adhesive mounting is necessary because of substrate. Provide 1/8-inch thick material.
1. Letter Color: White.
2. Letter Height: 1/2-inch.
3. Background Color: Black.
4. Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive where screws cannot or should not penetrate the substrate.
5. Access Panel Markers: Manufacturer's standard 1/16-inch thick engraved plastic laminate access panel markers, with abbreviations and numbers corresponding to concealed valve or devices/equipment. Include center hole to allow attachment.
2.2 TAGS
A. Manufacturers:
1. Brady Corporation
2. Brimar
3. Champion America
4. Craftmark
5. Seton
B. Plastic Tags: Laminated three-layer plastic with engraved black letters on light contrasting background color. Tag size minimum 2-inch diameter.
C. Metal Tags: Polished Brass with stamped letters; tag size minimum 2-inch diameter with smooth edges.
D. Valve designations to be coordinated with existing valve identifications to ensure no repetitive designations are utilized.
E. Chart/Schedules: Valve Schedule Frames. For each page of a valve schedule, provide glazed display frame with removable mounting as appropriate for wall construction upon which frame is to be mounted. Provide frames of finished hardwood or extruded aluminum, with SSB-grade sheet glass.
F. Valve Tag Fasteners: Solid brass chain (wire link or beaded type), or solid brass S-hooks.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 841
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT 23 05 53-3
G. Warning Tags: Preprinted or partially preprinted, accident-prevention tags; of plasticized card stock with matte finish suitable for writing.
1. Size: Approximately 4 by 7-inches.
2. Fasteners: Brass grommet and wire.
3. Nomenclature: Large-size primary caption such as DANGER, CAUTION, or DO NOT OPERATE.
4. Color: Yellow background with black lettering.
2.3 PLASTIC PIPE MARKERS
A. Manufacturers:
1. Brady Corporation
2. Brimar
3. Champion America
4. Craftmark
5. Seton
B. Color: Conform to ASME A13.1 and ANSI Z535.1.
C. Plastic Pipe Markers (for external diameters of 6-inches and larger including insulation): Factory fabricated, flexible, semi-rigid plastic, preformed to fit around pipe or pipe covering. Minimum information indicating flow direction arrow and identification of fluid being conveyed.
D. Plastic Tape Pipe Markers (for external diameters less than 6-inches including insulation):
Flexible, vinyl film tape with pressure sensitive adhesive backing and printed markings.
Minimum information indicating flow direction arrow and identification of fluid being conveyed.
E. Lettering:
1. 3/4-inch to 1-1/4-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 1/2- inch high letters.
2. 1-1/2-inch to 2-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 3/4- inch high letters.
3. 2-1/2-inch to 6-inch Outside Diameter of Insulation or Pipe: 12-inch long color field, 1-1/4- inch high letters.
4. 8-inch to 10-inch Outside Diameter of Insulation or Pipe: 24-inch long color field, 2-1/2- inch high letters.
5. Over 10-inch Outside Diameter of Insulation or Pipe: 32-inch long color field, 3-1/2-inch high letters.
2.4 CEILING TAGS
A. Manufacturers:
1. Brady Corporation
2. Brimar
3. Champion America
4. Craftmark
5. Seton
B. Description: Steel with 3/4-inch diameter color coded head.
C. Color code as follows:
1. Yellow - HVAC equipment.
2. Red - Fire dampers/smoke dampers.
3. Blue - Heating/cooling valves.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 842
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT 23 05 53-4
4. Ceiling tile labels, machine generated, adhesive backed tape labels with black letters, clear tape.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION
A. Identify piping, concealed or exposed, with plastic pipe markers.
B. Coordinate names, abbreviations and other designations used in mechanical identification work with corresponding designations shown, specified or scheduled. Provide numbers, lettering and wording as indicated or, if not otherwise indicated, as recommended by manufacturers or as required for proper identification and operation/maintenance of mechanical systems and equipment.
C. Multiple Systems: Where multiple systems of same generic name are shown and specified, provide identification which indicates individual system number as well as service (as examples:
Chiller No. 3, Air Handling Unit No. 42, Standpipe F12, and the like).
D. Degrease and clean surfaces to receive adhesive for identification materials.
E. Coordination: Where identification is to be applied to surfaces which require insulation, painting or other covering or finish, including valve tags in finished mechanical spaces, install identification after completion of covering and painting. Install identification prior to installation of acoustical ceilings and similar removable concealment.
F. Coordinate with the facility maintenance personnel to ensure consistency with the existing tagging system.
G. Install all products in accordance with manufacturer's instructions.
H. Manual Balancing Dampers: Provide 12-inch long orange marker ribbon to end of balancing damper handle.
3.2 PLASTIC NAMEPLATES
A. Install plastic nameplates with corrosive-resistant mechanical fasteners.
B. Identify control panels and major control components outside panels with plastic nameplates riveted to equipment body.
C. Identify thermostats with nameplates.
3.3 TAGS
A. Use metal tags on piping 3/4-inch diameter and smaller.
B. Tag balancing valves and major dampers with balanced GPM or CFM indicated after balancing is completed and accepted.
C. Install tags with corrosion resistant chain.
D. Small devices, such as in-line pumps, may be identified with tags.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 843
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND
EQUIPMENT 23 05 53-5
E. Identify valves with metal tags. Indicate valve function and the normally open or closed positions on the valve tag.
F. Identify air terminal units and radiator valves with numbered plastic tags.
G. Tag automatic controls, instruments, and relays. Key to control schematic.
H. Install valve schedule at each mechanical room.
3.4 PLASTIC PIPE MARKERS
A. Install plastic pipe markers complete around pipe in accordance with manufacturer's instructions.
B. Identify service, flow direction, and pressure. Install in clear view and align with axis of piping.
Locate identification not to exceed 20-feet (reduced to 10-feet in congested areas and mechanical equipment rooms) on straight runs including risers and drops, adjacent to each valve and Tee, at each side of penetration of structure or enclosure, and at each obstruction.
Locate near branches, valves, control devices, equipment connections, access doors, floor/wall penetrations.
3.5 CEILING TAGS
A. Provide ceiling tags to locate valves, dampers, and equipment above accessible ceilings.
Locate in corner of ceiling tee grid closest to equipment.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 844
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-1
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. General Requirements and Procedures
2. Pre-Construction Balance (Existing Systems)
3. Ductwork Pressure Testing
4. Fundamental Air Systems Balancing Procedures
5. Temperature Control Verification
6. Constant Volume Air Systems Balancing Procedures
7. Variable Air Volume Systems Additional Procedures
8. Pre-Balance Reporting
9. Final Reports:
a. Report Requirements
b. General Report Data
c. System Diagrams
d. Air Handling Units
e. Fans
f. Duct Traverses
g. Diffusers/Registers/Grilles
h. Instrument Calibration
10. Additional Tests
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Quality-Assurance Submittals: Submit two copies of evidence that the Testing, Adjusting, and Balancing (TAB) Agent and Project's TAB team members meet the qualifications specified in the "Quality Assurance" Article below.
2. Pre-Construction Phase Report:
a. Provide a pre-construction phase TAB Plan at least two weeks prior to the commencement of TAB work. This report is to include:
1) A complete set of report forms intended for use on the Project, with data filled in except for the field readings. Forms to be Project-specific. 2) Marked up shop drawings identifying all HVAC equipment to be balanced, and associated outlets and terminal devices.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 845
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-2
3) Identification of the type, manufacturer, and model of the actual instruments to be used, and clear indication of which instrument will be used to take each type of reading. Calibration certifications to be included. 4) A narrative of Project-specific and/or non-standard TAB procedures to be used, and the equipment or systems to which they apply.
3. Contract Documents Examination Report: Within 45 days from the Contractor's Notice to Proceed, submit two copies of the Contract Documents review report as specified in Part 3 of this Section.
4. Strategies and Procedures Plan: Submit two copies of the TAB strategies and step-by- step procedures as specified in Part 3 of this Section. Include a complete set of report forms intended for use on this Project.
5. Specify reports required because of editing procedures in Part 3 of this Section.
6. Certified TAB Reports: Submit two copies of reports prepared, as specified in this Section, on approved forms certified by the TAB Agent.
7. Sample Report Forms: Submit two sets of sample TAB report forms.
8. Test Instrument Calibration: Submit proof of calibration within the last 6 months.
9. Final Report.
10. Provide additional submittals to commissioning authority as dictated in Commissioning Specifications.
1.5 QUALITY ASSURANCE
A. Quality Assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Acceptable TAB Agencies:
a. Northern California:
1) RSAnalysis, Inc.
2) National Air Balance Company (NABCO)
3) Mesa 3
2. Balance Firm Qualifications:
a. General:
1) Procure services of independent TAB agency to balance, adjust and test water circulating and air moving equipment and air distribution or exhaust systems. Minimum experience: 5 years.
2) Provide proof of testing agency having successfully completed at least five projects of similar size and scope.
b. Testing and Balancing firm is certified by AABC and has an AABC Test and Balancer Engineer (TBE) on staff.
c. Industry Standards: Testing and Balancing will conform to AABC, and American National Standards Institute (ANSI) as follows:
1) AABC: Comply with National Standards for Total System Balance. 2) ANSI:
(a) S1.4 Specifications for sound level meters.
(b) S1.11 Specifications for Octave-Band and Fractional-Octave-Band analog and digital filters.
(c) ANSI S1.13 Methods for the Measurement of Sound Pressure Levels. d. Test Observation: If requested, conduct tests in the presence of the Commissioning Authority, AHJ, Architect or the Architect's representative.
3. Code Compliance: Perform tests in the presence of the Authority Having Jurisdiction (AHJ) where required by the Authority Having Jurisdiction (AHJ).
4. Owner Witness: Perform tests in the presence of the Commissioning Authority, Architect, Architect's Representative, or Owner's representative.
5. Engineer Witness: The engineer or engineer's representative reserves the right to observe tests or selected tests to assure compliance with the specifications.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 846
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-3
6. Simultaneous Testing: Test observations by the AHJ, the Owner's Authorized Representative and the engineer's representative need not occur simultaneously.
7. Do not perform TAB work until heating, ventilating, and air conditioning equipment has been completely installed and is operating continuously as required.
8. Conduct air testing and balancing with clean filters in place. Clean strainers prior to performing hydronic testing and balancing.
9. TAB Conference: Meet with the Commissioning Authority, Owner's and the Architect's representatives on approval of the TAB strategies and procedures plan to develop a mutual understanding of the details. Ensure the participation of TAB team members, equipment manufacturers' authorized service representatives, HVAC controls Installer, and other support personnel. Provide 7 days advance notice of scheduled meeting time and location.
a. Agenda Items: Include at least the following:
1) Submittal distribution requirements.
2) Contract Documents examination report.
3) TAB plan.
4) Work schedule and Project site access requirements.
5) Coordination and cooperation of trades and subcontractors. 6) Coordination of documentation and communication flow.
10. Certification of TAB Reports: This certification includes the following:
a. Review field data reports to validate accuracy of data and to prepare certified TAB reports.
b. Certify that the TAB team complied with the approved TAB plan and the procedures specified and referenced in this Specification.
11. TAB Reports: Use standard forms from AABC.
12. Instrumentation Type, Quantity, and Accuracy: As described in AABC.
13. Instrumentation Calibration: Calibrate instruments at least every 6 months or more frequently if required by the instrument manufacturer.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. TAB Agency provides warranty for a period of 90 days following submission of completed report, during which time, Owner may request a recheck of up to 10 percent of total number of terminals, or resetting of outlet, coil, or device listed in the final TAB report.
2. Guarantee: Meet the requirements of the following programs:
a. Provide a guarantee on AABC forms stating that the agency will assist in completing the requirements of the Contract Documents if the TAB Agent fails to comply with the Contract Documents. Guarantee includes the following provisions:
1) The certified Agent has tested, adjusted, and balanced systems according to the Contract Documents.
2) Systems are balanced to optimum performance capabilities within design and installation limits.
1.7 DEFINITIONS
A. Adjust: To regulate fluid flow rate and air patterns at the terminal equipment, such as to reduce fan speed or adjust a damper.
B. Balance: To proportion flows within the distribution system, including submains, branches, and terminals, according to design quantities.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 847
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-4
C. Draft: A current of air, when referring to localized effect caused by one or more factors of high air velocity, low ambient temperature, or direction of airflow, whereby more heat is withdrawn from a person's skin than is normally dissipated.
D. Procedure: An approach to and execution of a sequence of work operations to yield repeatable results.
E. Report Forms: Test data sheets for recording test data in logical order.
F. Static Head: The pressure due to the weight of the fluid above the point of measurement. In a closed system, static head is equal on both sides of the pump.
G. Suction Head: The height of fluid surface above the centerline of the pump on the suction side.
H. System Effect: A phenomenon that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.
I. System Effect Factors: Allowances used to calculate a reduction of the performance ratings of a fan when installed under conditions different from those presented when the fan was performance tested.
J. TAB: Testing, Adjusting, and Balancing.
K. Terminal: A point where the controlled medium, such as fluid or energy, enters or leaves the distribution system.
L. Test: A procedure to determine quantitative performance of a system or equipment.
M. Testing, Adjusting, and Balancing (TAB) Agent: The entity responsible for performing and reporting the TAB procedures.
N. AABC: Associated Air Balance Council.
O. AMCA: Air Movement and Control Association.
P. CTI: Cooling Tower Institute.
Q. SMACNA: Sheet Metal and Air Conditioning Contractors' National Association.
1.8 COORDINATION
A. Coordinate the efforts of factory-authorized service representatives for systems and equipment, HVAC controls installers, and other mechanics to operate HVAC systems and equipment to support and assist TAB activities.
B. Notice: Provide 7 days advance notice for each test. Include scheduled test dates and times.
C. Witness leakage and pressure tests carried out by Section 23 31 00, HVAC Ducts and Casings.
D. Perform TAB after leakage and pressure tests on air and water distribution systems have been satisfactorily completed.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 848
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-5
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION
3.1 GENERAL REQUIREMENTS AND PROCEDURES
A. Project Conditions:
1. Non-Owner Occupancy: Complete balancing of building systems prior to Substantial Completion and owner occupancy.
B. General Requirements:
1. Where HVAC systems and/or components interface with life safety systems, including fire and smoke detection, alarm, and controls, coordinate scheduling and testing and inspection procedures with authorities having jurisdiction.
2. Perform TAB work with doors, closed windows, and ceilings installed etc., to obtain simulated or project operating conditions. Do not proceed until systems scheduled for TAB are clean and free from debris, dirt and discarded building materials.
3. Where Owner occupies building during the testing period, cooperate with Owner to minimize conflicts with Owner's operations.
C. Examination:
1. Examine Contract Documents to become familiar with project requirements and existing building record documents (if available) to discover conditions in systems' designs that may preclude proper TAB of systems and equipment.
a. Contract Documents are defined in the General and Supplementary Conditions of the Contract.
b. Verify that balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, balancing valves and fittings, and manual volume dampers, are required by the Contract Documents. Verify that quantities and locations of these balancing devices are accessible and appropriate for effective balancing and for efficient system and equipment operation.
2. Examine approved submittal data of HVAC systems and equipment.
3. Examine Project record documents described in Division 01, General Requirements.
4. Examine Architect's and Engineer's design data, including Basis of Design, HVAC system descriptions, statements of design assumptions for environmental conditions and systems' output, and statements of philosophies and assumptions about HVAC system and equipment controls.
5. Examine equipment performance data, including fan and pump curves. Relate performance data to Project conditions and requirements, including system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system. Calculate system effect factors to reduce the performance ratings of HVAC equipment when installed under conditions different from those presented when the equipment was performance tested at the factory. To calculate system effects for air systems, use tables and charts found in AMCA 201, "Fans and Systems," Sections 7 through 10; or in SMACNA's "HVAC Systems--Duct Design," Sections 5 and 6. Compare this data with the design data and installed conditions.
6. Coordinate requirements in system and equipment with this Section.
7. Examine system and equipment installations to verify that they are complete and that testing, cleaning, adjusting, and commissioning specified in individual Specification Sections have been performed.
8. Examine system and equipment test reports.
9. Examine HVAC system and equipment installations to verify that indicated balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, balancing valves and fittings, and manual volume dampers, are properly installed, and their locations are accessible and appropriate for effective balancing and for efficient system and equipment operation.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 849
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-6
10. Examine systems for functional deficiencies that cannot be corrected by adjusting and balancing.
11. Examine equipment for installation and for properly operating safety interlocks and controls.
12. Report deficiencies discovered before and during performance of TAB procedures.
D. Preparation:
1. Prepare a TAB plan that includes strategies and step-by-step procedures.
2. Complete system readiness checks and prepare system readiness reports. Verify the following:
a. Permanent electrical power wiring is complete.
b. Hydronic systems are filled, clean, and free of air. c. Automatic temperature-control systems are operational. d. Equipment and duct access doors are securely closed. e. Balance, smoke, and fire dampers are open.
f. Isolating and balancing valves are open and control valves are operational. g. Ceilings are installed in critical areas where air-pattern adjustments are required and access to balancing devices is provided.
h. Windows, doors and other portions of the building envelope can be closed so design conditions for system operations can be met.
3. Hold a pre-balancing meeting at least one week prior to starting TAB work. a. Attendance is required by installers whose work will be tested, adjusted, or balanced.
4. Provide instruments required for TAB operations. Make instruments available to Architect to facilitate spot checks during testing.
E. General TAB Procedures:
1. Perform TAB procedures on each system according to the procedures contained in AABC and this Section.
2. Coordinate location of test probes prior to start of TAB procedures and make test probes available for Owner's tests after start of occupancy. Where required, cut insulation, ducts, pipes, and equipment cabinets for installation of test probes to the minimum extent necessary to allow adequate performance of procedures. After testing and balancing, close probe holes and patch insulation with new materials identical to those removed.
Restore vapor barrier and finish according to the insulation Specifications for this Project.
3. Mark equipment settings with paint or other suitable, permanent identification material, including damper-control positions, valve indicators, fan-speed-control levers, and similar controls and devices, to show final settings.
F. Adjustment Tolerances:
1. Air Handling Systems: Adjust to within plus or minus 5 percent of design for supply systems and plus or minus 5 percent of design for return and exhaust systems.
2. Air Outlets and Inlets: Adjust total to within plus 10 percent and minus 5 percent of design. Adjust outlets and inlets in space to within plus or minus 10 percent of design.
3. Hydronic Systems: Adjust to within plus or minus 10 percent of design at coils and plus or minus 5 percent at system pumps and equipment.
4. Adjust supply, return, and exhaust air quantities to maintain pressurization in spaces indicated on Drawings. Note and document room-to-room pressurization and maintain these relationships. Adjust pressure controlled spaces to within plus or minus 0.01 in WC.
G. Recording and Adjusting:
1. Field Logs: Maintain written logs including:
a. Running log of events and issues.
b. Discrepancies, deficient or uncompleted work by others. c. Contract interpretation requests.
d. Lists of completed tests.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 850
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-7
2. Ensure recorded data represents actual measured or observed conditions.
3. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.
4. Mark on drawings locations where traverse and other critical measurements were taken and cross reference location in final report.
5. After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified.
6. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.
7. At final inspection, recheck random selections of data recorded in report. Recheck points or areas as selected and witnessed by Owner's Authorized Representative, or Commissioning Agent.
3.2 PRE-CONSTRUCTION BALANCE (EXISTING SYSTEMS)
A. Pre-Construction Balance - Air Systems
1. Prior to start of construction or demolition; read and record airflow to establish “as-found” conditions. Provide pitot traverse of supply, return and exhaust ductwork at locations indicated on drawings and, as minimum, at central air handlers, main branch ductwork and at each floor.
2. Read and record static pressure conditions across existing filters, coils and fans.
3. Read and record amp draw and motor data from each existing air handler and fan that will be modified during Project.
B. Pre-Construction Balance - Hydronic Systems
1. Prior to start of construction or demolition; read and record flow of hydronic systems to establish "as-found" conditions.
2. Read and record head loss and flow at existing coils, heat exchangers, air control devices, and pumps.
3. Read and record amp draw and motor data from each existing pump.
C. Pre-Construction Balance - Plumbing
1. Prior to start of construction or demolition; read and record flow of existing plumbing hot water heaters, hot water recirculation pump and recirculation branch lines.
2. Read and record name plate data for existing water heaters, domestic hot water heat exchangers, and hot water recirculation pump.
D. Report data and observations to Architect.
3.3 DUCTWORK PRESSURE TESTING
A. Test ductwork prior to connection to fan equipment. Repair leaks and retest until stipulated results are achieved.
B. Provide air pressure testing of ductwork as noted below for various project types and systems:
1. Supply and return ductwork located inside shafts and outside building envelope.
2. Exhaust ductwork located inside shafts.
3. Exhaust ductwork located outside building envelope, when used in a heat recovery system.
4. Exhaust systems serving compounding pharmacies, laboratories, laboratory support spaces, fume hoods, bio-safety cabinets, or hazardous exhausts: pressure test all ductwork.
5. For other project types or systems: pressure test ductwork in accordance with SMACNA HVAC Air Duct Leakage Test Manual, of representative sections of installed ductwork totaling not less than the total installed duct areas noted below:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 851
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-8
a. For variable air volume supply, return, or exhaust air systems’ ductwork of higher than 2-inches pressure class: pressure test 40 percent of the total installed duct area.
b. For variable air volume supply, return, or exhaust air systems’ ductwork of 2- inches or less pressure class: pressure test ductwork connected to 10-percent of the total installed duct area of such ductwork, but not less than ductwork connected to two terminal units. Where the tested 10-percent fails to comply, then pressure test 40-percent of the total installed duct area. c. For constant air volume supply, return, or exhaust systems: pressure test 40- percent of the total installed duct area.
6. Where tests are required, provide separate tests for each of supply, return and exhaust air systems.
7. Where the tested 40-percent fails to comply with the requirements of this section, then pressure test 100-percent of the total installed duct area. Sections shall be selected by the building owner or the Architect and shall include sections of ductwork upstream and downstream of terminal units. Positive pressure leakage testing may be utilized for negative pressure ductwork.
8. Area requirement of 40-percent of the total installed duct area is inclusive of ductwork located in shafts or outside building envelope.
C. Test ductwork prior to connection to fan equipment. Repair leaks and retest until stipulated results are achieved. Pressure testing to meet the following leakage classifications below as a minimum (2012 SMACNA HVAC Air Duct Leakage Manual, Table 4-1):
1. Leakage class to be as defined below as a minimum.
a. Minimum Duct Leakage Classification
Duct Type Leakage Class
Metal (Flexible excluded)
Round and flat oval 3
Rectangular 6
2. Testing machine: Meet requirements of SMACNA standards. Pacific Air Products "Port- O-Lab", Rolok, or United Sheet Metal.
3. Test supply systems prior to connecting terminal units.
4. Perform tests in presence of Owner's Authorized Representative. Give 48 hours advance notice before commencement of each test.
5. Test ductwork systems in sections as large as possible and record test results accordingly.
6. Leak test grease exhaust ductwork per requirements of latest edition of NFPA-96 and local Mechanical Code.
7. Coordinate testing with ceiling installation.
a. Provide sheet-metal plates and install between each duct test section (applies to main-to-main fittings, branch-to-branch fittings and main-to-branch fittings). At each plate location, fabricate joint with Ductmate. Insert 14 gauge sheet metal between Ductmate using a neoprene gasket on both sides of metal plate. b. Leave plates in place until isolated section has been tested and approved by Owner's Authorized Representative.
c. Once sections have passed test, remove plates and reattach Ductmate joints. After fan unit is running, test joint for leakage by using a mixture of soap and water. If noise or bubbling occurs, reseal joint. Owner's Authorized Representative to witness this procedure.
8. Test duct at 1.5 times the design air pressure, up to pressure class of the duct. Seal audible leaks.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 852
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-9
3.4 FUNDAMENTAL AIR SYSTEMS BALANCING PROCEDURES
A. Examine air-handling equipment to ensure clean filters have been installed, bearings are greased, belts are aligned and tight, and equipment with functioning controls is ready for operation.
B. Examine terminal units, such as variable-air-volume boxes and mixing boxes, to verify that they are accessible and their controls are connected and functioning.
C. Examine heat-transfer coils for correct piping connections and for clean and straight fins.
D. Prepare test reports for both fans and inlets and outlets. Obtain manufacturer's outlet factors and recommended testing procedures. Cross check the summation of required outlet volumes with required fan volumes.
E. Prepare schematic diagrams of systems' "as-built" duct layouts.
F. Determine the best locations in main and branch ducts for accurate duct airflow measurements.
G. Check the airflow patterns from the outside-air louvers and dampers and the return-air and exhaust-air dampers, through the supply-fan discharge and mixing dampers.
H. Locate start-stop and disconnect switches, electrical interlocks, and motor starters.
I. Verify that motor starters are equipped with thermal protection, sized for the connected load.
J. Check dampers for proper position to achieve desired airflow path.
K. Check for airflow blockages.
L. Check for readily observable leaks in air-handling unit components and ductwork.
M. Use sheaves and pulleys to adjust the speed of belt drive fans to achieve design flow with motors running at 60 Hertz unless noted otherwise.
3.5 TEMPERATURE CONTROL VERIFICATION
A. Examine automatic temperature system components to verify the following:
1. Dampers, valves, and other controlled devices operate by the intended controller.
2. Dampers and valves are in the position indicated by the controller.
3. Integrity of valves and dampers for free and full operation and for tightness of fully closed and fully open positions. This includes dampers in multizone units, mixing boxes, and variable-air-volume terminals.
4. Automatic modulating and shutoff valves, including 2-way valves and 3-way mixing and diverting valves, are properly connected.
5. Thermostats and humidistats are located to avoid adverse effects of sunlight, equipment, drafts, and cold walls.
6. Sensors are located to sense only the intended conditions.
7. Sequence of operation for control modes is according to the Contract Documents.
8. Controller set points are set at design values. Observe and record system reactions to changes in conditions. Record default set points if different from design values.
9. Interlocked systems are operating.
10. Changeover from heating to cooling mode occurs according to design values.
B. Verify that controllers are calibrated and commissioned.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 853
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-10
C. Check transmitter and controller locations and note conditions that would adversely affect control functions.
D. Record controller settings and note variances between set points and actual measurements.
E. Verify operation of limiting controllers (i.e., high- and low-temperature controllers).
F. Verify free travel and proper operation of control devices such as damper and valve operators.
G. Verify sequence of operation of control devices. Note air pressures and device positions and correlate with airflow and water-flow measurements. Note the speed of response to input changes.
H. Confirm interaction of electrically operated switch transducers.
I. Confirm interaction of interlock and lockout systems.
J. Verify main control supply-air pressure and observe compressor and dryer operations.
K. Note operation of electric actuators using spring return for proper fail-safe operations.
3.6 CONSTANT VOLUME AIR SYSTEMS BALANCING PROCEDURES
A. Adjust fans to deliver total design airflows within the maximum allowable rpm listed by the fan manufacturer. Adjust fans to deliver design airflow at the lowest possible speed.
1. Measure fan static pressures to determine actual static pressure as follows:
a. Measure outlet static pressure as far downstream from the fan as practicable and upstream from restrictions in ducts such as elbows and transitions. b. Measure static pressure directly at the fan outlet or through the flexible connection. c. Measure inlet static pressure of single-inlet fans in the inlet duct as near the fan as possible, upstream from flexible connection and downstream from duct restrictions.
2. Measure static pressure across each air-handling unit component under final balanced condition.
3. Compare design data with installed conditions to determine variations in design static pressures versus actual static pressures. Recommend corrective action to align design and actual conditions.
4. Make required adjustments to pulley sizes, motor sizes, and electrical connections to accommodate fan-speed changes.
5. Do not make fan-speed adjustments that result in motor loading greater than full load amps. Do not increase fan speed beyond fan class rating. Modulate dampers and measure fan-motor amperage to ensure no overload will occur. Measure amperage in full cooling, full heating, and economizer modes to determine the maximum required brake horsepower.
6. Adjust volume dampers for main duct, submain ducts, and major branch ducts to design airflows within specified tolerances.
7. Calibrate airflow measuring stations.
3.7 VARIABLE AIR VOLUME SYSTEMS ADDITIONAL PROCEDURES
A. Compensating for Diversity:
1. When the total airflow of terminal units is more than the fan design airflow volume, place a selected number of terminal units at a maximum set-point airflow condition until the total airflow of the terminal units equals the design airflow of the fan. Select the reduced airflow terminal units so they are distributed evenly among the branch ducts.
2. Pressure-Independent, Variable-Air Volume Systems:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 854
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-11
a. After the fan systems have been adjusted, adjust the variable-air-volume systems as follows:
1) Set outside-air dampers at minimum, and return-air and exhaust-air dampers at a position that simulates full-cooling load. 2) Select the terminal unit that is most critical to the supply-fan airflow and static pressure. Measure static pressure. Adjust system static pressure to deliver design airflow at the terminal unit.
3) Measure total system airflow. Adjust to within 10 percent of design airflow. 4) Set terminal units at maximum airflow and adjust controller or regulator to deliver the designed maximum airflow. Use the terminal unit manufacturer's written instructions to make this adjustment. When total airflow is correct, balance the air outlets downstream from terminal units. 5) Set terminal units at minimum airflow and adjust controller or regulator to deliver the designed minimum airflow. Check air outlets for a proportional reduction in airflow.
(a) If air outlets are out of balance at minimum airflow, report the condition but leave the outlets balanced for maximum airflow. 6) Remeasure the return airflow to the fan while operating at maximum return airflow and minimum outside airflow. Adjust the fan and balance the return- air ducts and inlets.
7) Measure static pressure at the most critical terminal unit and adjust the static-pressure controller at the main supply-air sensing station to ensure adequate static pressure is maintained at the most critical unit. Balance system to achieve the lowest required differential pressure for the system to minimize fan brake horsepower.
8) Balance terminal units in variable volume systems for maximum cooling, maximum heating, and minimum ventilation (demand based ventilation systems) airflow rates.
9) Record the final fan performance data.
3. Pressure-Dependent, Variable-Air Volume Systems with Diversity:
a. After the fan systems have been adjusted, adjust the variable-air-volume systems as follows:
1) Set system at maximum design airflow by setting the required number of terminal units at minimum airflow. Select the reduced airflow terminal units so they are distributed evenly among the branch ducts.
2) Adjust supply fan to maximum design airflow with the variable-airflow controller set at maximum airflow.
3) Set terminal units being tested at full-airflow condition. 4) Adjust terminal units starting at the supply-fan end of the system and continuing progressively to the end of the system. Adjust inlet dampers of each terminal unit to design airflow. When total airflow is correct, balance the air outlets downstream from terminal units.
5) Adjust terminal units for minimum airflow.
6) Measure static pressure duct system at the sensor.
7) Measure the return airflow to the fan while operating at maximum return airflow and minimum outside airflow. Adjust the fan and balance the return- air ducts and inlets.
8) Measure supply return and outside airflows with dampers at full economizer position.
4. Additional Requirements: Provide all additional procedures to compensate for diversity as prescribed in AABC standards and/or ASHRAE standards.
5. Calibrate airflow measuring stations.
3.8 PRE-BALANCE REPORTING
A. Pre-Construction Phase Report:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 855
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-12
1. Provide a pre-construction phase TAB Plan at least 2 weeks prior to the commencement of TAB work. This report is to include:
a. A complete set of report forms intended for use on the Project, with all data filled in except for the field readings. Forms to be Project-specific. b. Marked up shop drawings identifying all HVAC equipment to be balanced, and associated outlets and terminal devices.
c. Identification of the type, manufacturer, and model of actual instruments to be used, and clear indication of which instrument will be used to take each type of reading. Calibration certifications are to be included. d. A narrative of Project-specific and/or non-standard TAB procedures to be used, and the equipment or systems they apply to.
B. Initial Construction-Phase Report: Based on examination of the Contract Documents as specified in "Examination" Article above, prepare a report on the adequacy of design for systems' balancing devices. Recommend changes and additions to systems' balancing devices to facilitate proper performance measuring and balancing. Recommend changes and additions to HVAC systems and general construction to allow access for performance measuring and balancing devices.
C. Status Reports: As Work progresses, prepare reports to describe completed procedures, procedures in progress, and scheduled procedures. Include a list of deficiencies and problems found in systems being tested and balanced.
3.9 FINAL REPORTS
A. Report Requirements:
1. General:
a. Computer generated in PDF format and tabulated, divided, and bookmarked into sections by tested and balanced systems.
b. Include a certification sheet in front of binder signed and sealed by the certified TAB engineer.
1) Include a list of the instruments used for procedures, along with proof of calibration.
c. Final Report Contents: In addition to the certified field report data, include the following:
1) Pump curves
2) Fan Curves
3) Manufacturers Test Data
4) Field test reports prepared by system and equipment installers 5) Other information relative to equipment performance, but do not include approved Shop Drawings and Product Data
B. General Report Data:
1. In addition to the form titles and entries, include the following data in the final report, as applicable:
a. Title Page
b. Name and Address of TAB Agent
c. Project Name
d. Project Location
e. Architect's Name and Address
f. Engineer's Name and Address
g. Contractor's Name and Address
h. Report Date
i. Signature of TAB Agent who Certifies the Report
j. Summary of Contents, Including the Following:
1) Design versus Final Performance
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 856
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-13
2) Notable Characteristics of Systems
3) Description of System Operation Sequence if it varies from the Contract Documents
k. Nomenclature Sheets for Each Item of Equipment
l. Data for Terminal Units, including Manufacturer, Type Size, and Fittings m. Notes to explain why certain final data in the body of reports vary from design values.
n. Test Conditions for Fans and Pump Performance Forms, Including the Following:
1) Settings for Outside-, Return-, and Exhaust-Air Dampers 2) Conditions of Filters
3) Cooling Coil, Wet- and Dry-bulb Conditions
4) Face and Bypass Damper Settings at Coils
5) Fan Drive Settings, including Settings and Percentage of Maximum Pitch Diameter
6) Inlet Vane Settings for Variable-Air-Volume Systems
7) Settings for Supply-air, Static-pressure Controller
8) Other System Operating Conditions that affect Performance C. System Diagrams:
1. Include schematic layouts of air and hydronic distribution systems. Present with single- line diagrams and include the following:
a. Quantities of Outside, Supply, Return, and Exhaust Airflows b. Water and Steam Flow Rates
c. Duct, Outlet, and Inlet Sizes
d. Pipe and Valve Sizes and Locations
e. Terminal Units
f. Balancing Stations
D. Air Handling Units:
1. For air-handling units include the following:
a. Unit Data: Include the following:
1) Unit Identification
2) Location
3) Make and Type
4) Model Number and Unit Size
5) Manufacturer's Serial Number
6) Unit Arrangement and Class
7) Discharge Arrangement
8) Sheave Make, Size in inches, and Bore
9) Sheave Dimensions, Center-to-center and Amount of Adjustments in Inches 10) Number of Belts, Make, and Size
11) Number of Filters, Type, and Size
b. Motor Data: Include the following:
1) Make and Frame Type and Size
2) Horsepower and rpm
3) Volts, Phase, and Hertz
4) Full-load Amperage and Service Factor
5) Sheave Make, Size in Inches, and Bore
6) Sheave Dimensions, Center-to-center and Amount of Adjustments in Inches c. Test Data: Include design and actual values for the following:
1) Total Airflow Rate in cfm (L/s)
2) Total System Static Pressure in Inches wg (Pa)
3) Fan rpm
4) Discharge Static Pressure in Inches wg (Pa)
5) Filter Static-pressure Differential in Inches wg (Pa) 6) Preheat Coil Static-pressure Differential in Inches wg (Pa) October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 857
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-14
7) Cooling Coil Static-pressure Differential in Inches wg (Pa) 8) Heating Coil Static-pressure Differential in Inches wg (Pa) 9) Outside Airflow in cfm (L/s)
10) Return Airflow in cfm (L/s)
11) Outside-air Damper Position
12) Return-air Damper Position
13) Vortex Damper Position
E. Fans:
1. Fan Test Reports: For supply, return, and exhaust fans, include the following:
a. Fan Data: Include the following:
1) System Identification
2) Location
3) Make and Type
4) Model Number and Size
5) Manufacturer's Serial Number
6) Arrangement and Class
7) Sheave Make, Size in Inches, and Bore
8) Sheave Dimensions, Center-to-center and Amount of Adjustments in Inches b. Motor Data: Include the following:
1) Make and Frame Type and Size
2) Horsepower and rpm
3) Volts, Phase, and Hertz
4) Full-load Amperage and Service Factor
5) Sheave Make, Size in Inches, and Bore
6) Sheave Dimensions, Center-to-center and Amount of Adjustments in Inches 7) Number of Belts, Make, and Size
c. Test Data: Include design and actual values for the following:
1) Total Airflow Rate in cfm
2) Total System Static Pressure in Inches wg
3) Fan rpm
4) Discharge Static Pressure in Inches wg
5) Suction Static Pressure in Inches wg
F. Duct Traverses:
1. Include a diagram with a grid representing the duct cross-section and record the following:
a. Report Data: Include the following:
1) System and Air-handling Unit Number
2) Location and Zone
3) Duct Static Pressure in Inches wg
4) Duct Size in Inches
5) Duct Area in SF
6) Design Airflow Rate in cfm
7) Design Velocity in fpm
8) Actual Airflow Rate in cfm
9) Actual Average Velocity in fpm
G. Diffusers/Registers/Grilles:
1. For diffusers, registers and grilles, include the following:
a. Unit Data: Include the following:
1) System and Air-handling Unit Identification
2) Location and Zone
3) Test Apparatus Used
4) Area Served
5) Air-terminal-device Make
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 858
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 05 93-15
6) Air-terminal-device Number from System Diagram
7) Air-terminal-device Type and Model Number
8) Air-terminal-device Size
9) Air-terminal-device Effective Area in SF
b. Test Data: Include design and actual values for the following:
1) Airflow Rate in cfm
2) Air Velocity in fpm
3) Final Airflow Rate in cfm
4) Final Velocity in fpm
5) Space Temperature in Degrees F
H. Instrument Calibration:
1. For instrument calibration, include the following:
a. Report Data: Include the following:
1) Instrument Type and Make
2) Serial Number
3) Application
4) Dates of Use
b. Dates of Calibration
3.10 ADDITIONAL TESTS
A. Within 90 days of completing TAB, perform additional testing and balancing to verify that balanced conditions are being maintained throughout and to correct unusual conditions.
B. Seasonal Periods: If initial TAB procedures were not performed during near-peak summer and winter conditions, perform additional inspections, testing, and adjusting during near-peak summer and winter conditions.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 859
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-1
SECTION 23 07 00
HVAC INSULATION
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Type A, Flexible Glass Wool Blanket
2. Type 1, Glass Wool Pipe Insulation
3. Jacketing
4. Accessories
5. Duct Insulation Accessories
6. Duct Insulation Compounds
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Piping and duct insulation products to contain less than 0.1 percent by weight PBDE in all insulating materials.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Installer qualifications.
2. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any) for each type of product indicated.
a. Where indicated R-values/ratings cannot be achieved by a single layer of insulation, describe how performance requirements will be achieved.
3. Material Test Reports: From a qualified testing agency acceptable to authorities having jurisdiction indicating, interpreting, and certifying test results for compliance of insulation materials, sealers, attachments, cements, and jackets with requirements indicated.
Include dates of tests.
4. Installer Certificates: Signed by the Contractor certifying that installers comply with requirements.
5. Submit manufacturer's installation instructions.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Formaldehyde Free: Should be third-party certified with UL Environment Validation.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 860
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-2
2. Recycled Content: A minimum of 40 percent post-consumer recycled glass content certified and UL validated.
3. Low Emitting Materials: For all thermal and acoustical applications of Glass Mineral Wool Insulation products, provide materials complying with the testing and products requirements of UL GREENGUARD Gold Certification.
4. Installer to have minimum 5 years' experience in the business of installing insulation.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 FIRE HAZARD CLASSIFICATION
A. Maximum fire hazard classification of the composite insulation construction as installed to be not more than a Flame Spread Index (FSI) of 25 and Smoke Developed Index (SDI) of 50 as tested by current edition of ASTM E84 (NFPA 255) method.
B. Test pipe insulation in accordance with the requirements of current edition of UL "Pipe and Equipment Coverings R5583 400 8.15."
C. Test duct insulation in accordance with current edition of ASTM E84, UL 723, NFPA 255, NFPA 90A and NFPA 90B.
PART 2 - PRODUCTS
2.1 TYPE A, FLEXIBLE GLASS WOOL BLANKET
A. Acceptable Manufacturers:
1. Certainteed
2. Johns Manville
3. Knauf
4. Owens-Corning
B. ASTM C553, Type 1, Class B-2; flexible blanket.
C. 'K' Value: 0.27 BTU*in/(hr*sf*F) at 75 degrees F installed, maximum service temperature: 250 degrees F.
D. Density: 0.75 pounds per cubic foot.
E. DBDE-free. UL/E validated to be formaldehyde-free.
F. Vapor Barrier Jacket: FSK aluminum foil reinforced with glass wool yarn and laminated to fire resistant Kraft, secured with UL listed pressure sensitive tape or outward clinched expanded staples and vapor barrier mastic as needed.
2.2 TYPE 1, GLASS WOOL PIPE INSULATION
A. Acceptable Manufacturers:
1. Certainteed
2. Johns Manville
3. Knauf
4. Owens-Corning
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 861
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-3
B. Glass Wool: ASTM C547 Type I and IV; rigid molded, noncombustible.
1. Thermal Conductivity Value: As indicated in the insulation tables below.
2. Maximum Service Temperature: 850 degrees F to 1000 degrees F.
C. Vapor Retarder Jacket: White Kraft paper reinforced with glass wool and bonded to aluminum foil, secure with self-sealing longitudinal laps and butt strips or vapor barrier mastic.
2.3 JACKETING
A. Acceptable Manufacturers:
1. ITW Insulation Systems
2. General Insulation Company
3. Johns Manville
4. 3M
5. Or approved equivalent.
B. Insulation Jacketing Tape: 0.016-inch thick multi-layered laminate with minimum tensile strength of 149-lb/inch, minimum puncture resistance of 49 pounds per ASTM D1000, maximum emittance of 0.03 per ASTM C1371, maximum WVTR of 0.00 perm per ASTM E96, and min/max service temperature of -40 degrees F to 300 degrees F, as manufactured by 3M, VentureClad1579GCW-E.
C. PVC preformed molded insulation covers, for piping. Zeston or approved equivalent.
D. Aluminum Jacket: 0.016-inch-thick sheet, (smooth/embossed) finish, with longitudinal slip joints and 2-inch laps, die-shaped fitting covers with factory attached protective liner.
E. Stainless Steel Jacket: Type 304 stainless steel, 0.010-inch, smooth finish.
F. Canvas Jacket: UL listed fabric, 6 ounce/sq.yd., plain weave cotton treated with dilute fire retardant lagging adhesive.
2.4 ACCESSORIES
A. Acceptable Manufacturers:
1. ITW Insulation Systems
2. Or approved equivalent.
B. Equipment Insulation Jacketing: Presized glass cloth, not less than 7.8 ounces/sq.yd., except as otherwise indicated. Coat with gypsum based cement.
C. Equipment Insulation Compounds: Provide adhesives, cement, sealers, mastics and protective finishes as recommended by insulation manufacturer for applications indicated.
D. General: Provide staples, bands, wire, wire netting, tape corner angles, anchors, stud pins and metal covers as recommended by insulation manufacturer for applications indicated.
Accessories, i.e., adhesives, mastics, cements and tape to have the same flame and smoke component ratings as the insulation materials with which they are used. Shipping cartons to bear a label indicating that flame and smoke ratings do not exceed those listed above. Provide permanent treatment of jackets or facings to impart flame and smoke safety. Provide non-water- soluble treatments. Provide UV protection recommended by manufacturer for outdoor installation.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 862
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-4
2.5 DUCT INSULATION ACCESSORIES
A. Acceptable Manufacturers:
1. Certainteed
2. Johns Manville
3. Owens-Corning
B. Staples, bands, wires, tape, anchors, corner angles and similar accessories as recommended by insulation manufacturer for applications indicated.
2.6 DUCT INSULATION COMPOUNDS
A. Acceptable Manufacturers:
1. Certainteed
2. Johns Manville
3. Owens-Corning
B. Cements, adhesives, coatings, sealers, protective finishes and similar accessories as recommended by insulation manufacturer for applications indicated. Comply with South Coast Air Quality Management District (SCAQMD) Rule #1168 in accordance with LLE EQ 4.1.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Verification of Conditions:
1. Do not apply insulation until pressure testing and inspection of ducts and piping has been completed.
2. Examine areas and conditions under which duct and pipe insulation will be installed. Do not proceed with work until unsatisfactory conditions have been corrected.
B. Preparation: Clean and dry surfaces to be insulated.
C. Installation:
1. Insulation: Continuous through walls, floors and partitions except where noted otherwise.
2. Piping and Equipment:
a. Install insulation over clean, dry surfaces with adjoining sections firmly butted together and covering surfaces. Fill voids and holes. Seal raw edges. Install insulation in a manner such that insulation may be split, removed, and reinstalled with vapor barrier tape on strainer caps and unions. Do not install insulation until piping has been leak tested and has passed such tests. Do not insulate manholes, equipment manufacturer's nameplates, handholes, and ASME stamps. Provide beveled edge at such insulation interruptions. Repair voids or tears.
D. Provide accessories as required. See Part 2 Article "Accessories" above.
E. Protection and Replacement: Installed insulation during construction. Replace damaged insulation which cannot be repaired satisfactorily, including units with vapor barrier damage and moisture saturated units.
F. Labeling and Marking: Provide labels, arrows and color on piping and ductwork. Attach labels and flow direction arrows to the jacketing per Section 23 05 53, Identification for HVAC Piping, Ductwork and Equipment.
G. Ductwork:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 863
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-5
1. Install insulation in conformance with manufacturer's recommendations to completely cover duct.
2. Butt insulation joints firmly together and install jackets and tapes smoothly and securely.
3. Apply duct insulation continuously through sleeves and prepared openings, except as otherwise specified. Apply vapor barrier materials to form complete unbroken vapor seal over insulation.
4. Coat staples and seals with vapor barrier coating.
5. Cover breaks in jacket materials with patches of same material as vapor barrier. Extend patches not less than 3-inches beyond break or penetration on all directions and secure with adhesive and staples. Seal staples and joints with vapor barrier coating.
6. Fill jacket penetrations, i.e., hangers, thermometers and damper operating rods, and other voids in insulation, with vapor barrier coating. Seal penetration with vapor barrier coating. Insulate hangers and supports for cold duct in un-conditioned spaces to extent to prevent condensation on surfaces.
7. Seal and flash insulation terminations and pin punctures with reinforced vapor barrier coating.
8. Continue insulation at fire dampers and fire/smoke dampers up to and including those portions of damper frame visible at outside of the rated fire barrier. Insulating terminations at fire dampers in accordance with this Section.
9. Do not conceal duct access doors with insulation. Install insulation terminations at access door in accordance with this Section.
H. Ductwork Surfaces to be Insulated: California
Item to be
Insulated
System Insulation
Type
Duct Size Insulation Thickness
Supply ductwork
where duct is not
specified to be
lined.
A All 1.5-inch
Return ductwork
where duct is not
specified to be
lined.
-- All None
Exhaust ducts
within 10-feet of
exterior
A All 3-inch
1. Note: Insulation thickness shown is a minimum. If state codes require additional thickness, then provide insulation thickness per code requirements.
I. Piping Surfaces to be Insulated:
Item to be
Insulated
System
Insulation
Type
Conductivity
Range (Btu-
inch per hour
per SF per
degrees F)
Pipe Size (Inches)
Insulation
Thickness
(Inches)
Heating,
Steam, and
Steam
Condensate
(141F to
200F)
1 0.25-0.29 at a
mean rating
temperature of
125 degrees F
<1
1 to <1.5
1.5 to <4
4 to <8
>= 8
1.5 1.5
2.0 2.0
2.0 October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 864
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-6
1. Note: Insulation thickness shown is a minimum. If state code requires additional thickness, then provide insulation thickness per code requirements.
3.2 TYPE A, FLEXIBLE GLASS WOOL BLANKET
A. Install insulation in conformance with manufacturer's recommendations and requirements.
B. Duct Wrap: Cover air ducts per insulation table except ducts internally lined where internal duct lining is adequate to achieve adequate insulating values to meet local Energy Codes (indicate on shop drawings, locations where duct wrap is planned to be omitted and indicate internal duct lining insulating values to confirm they will meet the Energy Code). Wrap tightly with circumferential joints butted and longitudinal joints overlapped minimum of 2-inches. On ducts over 24-inches wide, additionally secure insulation with suitable mechanical fasteners at 18- inches on center. Circumferential and longitudinal joints stapled with flare staples 6-inches on center and covered with 3-inch wide, foil reinforced tape.
3.3 TYPE 1, GLASS WOOL PIPE INSULATION
A. See General Installation Requirements above.
B. Install insulation in conformance with manufacturer's recommendations and requirements.
C. Lap seal insulation with waterproof adhesive. Do not use staples or other methods of attachment which would penetrate vapor barrier. Apply fitting covers with seated tacks and vapor barrier tape.
D. Apply insulation to pipe and seal with self-sealing lap. Use self-sealing butt strips to seal butt joints. Insulate fittings, valves and unions with single or multiple layers of insulation and cover to match pipe or use preformed PVC molded insulation covers.
3.4 JACKETING
A. See General Installation Requirements above.
B. Install in accordance with manufacturer's instructions.
3.5 ACCESSORIES
A. Install insulation in conformance with manufacturer's instructions, recommendations and requirements.
B. See General Installation Requirements above.
C. Furnish and install accessories for all insulation types listed in this Section.
3.6 DUCT INSULATION ACCESSORIES
A. Install insulation in conformance with manufacturer's recommendations and requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 865
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC INSULATION 23 07 00-7
3.7 DUCT INSULATION COMPOUNDS
A. Install insulation in conformance with manufacturer's recommendations and requirements.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 866
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-1
SECTION 23 09 00
INSTRUMENTATION AND CONTROL PERFORMANCE SPECIFICATIONS
PART 1 - GENERAL
1.1SUMMARY
A. The base building has an existing KMC Controls building automation system, provided and/or maintained by Comfort International, Inc.. Expand the existing building automation system to control new equipment associated with this project.
B. Work Included:
1. Communications
2. Operator Interface
3. Controller Software
4. Web Based Access
5. BAS Graphics
6. Application Specific Controller - Terminal Unit Controllers
7. Input/Output Interface
8. Power Supplies and Line Filtering
9. Control Panels
10. Auxiliary Control Devices
11. Wiring and Raceways
12. Smoke Detection for Projects with a Building Fire Alarm System C. This is a performance specification and Contractor is responsible for design tasks and engineering.
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Current edition of ANSI/ASHRAE Standard 135 and addendum, BACnet.
2. Current edition of UL 916 Underwriters Laboratories Standard for Energy Management Equipment, Canada and the US.
3. Current edition of FCC Part 15, Subpart J, Class A.
4. Current edition of BACnet Testing Laboratories (BTL).
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Prepare and submit a detailed schedule of work. Schedule to identify milestones such as equipment submittals, control panel diagrams, color graphic panel displays, Interlock.
2. Wiring diagrams, control program sequence software flow chart diagrams, conduit layout diagrams, device location diagrams, equipment and component deliveries, installation October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 867
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-2
sequencing, controller startup, point to point startup, control programming, sequence testing, commissioning/acceptance testing and training.
3. Submit design drawings, sequences of operation, program listings, software flow charts and details for each typical piece of equipment and system being controlled. No work to be initiated or fabrication of any equipment started prior to the Owner's Authorized Representatives return of REVIEWED submittals.
a. Sequence of Operation: The sequence of operation included in the design documents is intended only to communicate the Engineers’ general control intent and is not to be used as a direct reference for programming of the EMS system.
Verbatim duplication of the Engineer’s Sequence of Operation on the submittals is discouraged and may result in non-approval of the submittal. Sequence of operation on submittals to accurately detail the system’s intended programming, and include details of enhancements, adjustments, or deviations from the Engineer’s sequence of operation. Submitted sequence of operation to be written with a logical and organized format and flow. Provide detailed, clear and unambiguous sequence of operation language. Point descriptors and point nomenclature referenced in the submitted sequence of operation to match those (to be) actually programmed. As-built submittal Sequence of Operation to include modifications to the programming made as a result of any addendum, bulletins, RFI’s, change orders, and commissioning.
4. Format: Make each submittal in one complete and contiguous package. Partial or unmarked submittals will be rejected without review.
5. Submit Manufacturers Data as Follows:
a. Complete materials list of items proposed to be furnished and installed. A complete Bill of Materials, listing materials, components, devices, wire and equipment are required for this work. The Bill of Materials to be separate for each controller on its own page(s) and to contain the following information for each item listed:
1) Manufacturer's Name and Model number with furnished options highlighted. 2) Quantity of each by controller location.
3) Description of product (generic).
4) Specified item.
5) Operating range or span.
6) Operating point or setpoint.
b. Manufacturer's specifications and other data required demonstrating compliance with the specified requirements, including but not limited to: Catalog cuts, technical data and descriptive literature on hardware, software, and system components to be furnished.
c. The data to be clearly marked and noted to identify specific ranges, model numbers, sizes, and other pertinent data. Submit printed manufacturer's technical product data for each control device furnished, indicating dimensions, capacities, performance characteristics, electrical characteristics, finishes of materials and including printed installation instructions and start-up instructions. d. Unless specifically called for otherwise, provide bound copies of catalog cuts for standard products, not requiring specifically prepared Shop Drawings, for the following:
1) Wire and Cable, Class II
2) Face Plates for Devices
3) Disconnect Switches for Power Control
e. Where more than one item, size, rating or other variations appear on a catalog cut sheet, clearly identify items to be provided. These items to be properly indexed and referenced to identification numbers, designations and/or details on the Drawings.
6. Shop Drawings: Submit shop drawings for each controlled system, depicting the following information:
a. Schematic flow diagram of system showing fans, pumps, coils, dampers, valves and other control/monitoring devices.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 868
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-3
b. Label each control device with initial setting or adjustable range of control. Label points in schematic diagrams with termination at corresponding controller. c. Electrical Wiring: Clearly differentiate between portions of wiring that are factory installed and portions of be field-installed.
d. Details of control panel faces, including controls, instruments, and labeling. e. Interfaces to equipment furnished under other Specification Sections identifying numbers of wires, termination location, voltages and pertinent details.
Responsibility for each end of the interfaces to be noted on these drawings whether or not they are a part of this Section.
f. System architecture diagram showing the global connectivity of new controllers and any existing systems that will be connected to.
7. Equipment locations, wiring and piping schematics, details, panel configurations, sizes, damper motor mounting details, valve schedules, and a points list keyed to specific hardware submittals. Control wiring depicted as fully annotated ladder diagrams with terminations identified, completely configured as to the exact panel, wiring, relay, switch, and component configuration.
8. Tag Number Lists: Develop instruments tag number system and submit list for approval.
Coordinate methods and number block with the Owner's Authorized Representative.
9. Format the Shop and Field Drawings to Include:
a. A Title Sheet containing a drawing list, abbreviations list, symbols list, site and vicinity maps for project location and schedules.
b. Floor Plans showing proposed device locations and device nomenclatures. c. A Riser Diagram illustrating conduit relationships between devices shown on the Floor Plans. Show device nomenclatures.
d. A Single-Line Diagram for each system showing signal relationships of devices within the system. Show device nomenclatures.
e. A Wiring Diagram for each assembly, enclosure or free standing device, showing:
1) The Devices Within
2) Wiring Connections
3) Wire Identification
4) Voltage Levels
5) Fuse Ratings
f. Operations and Maintenance Manuals:
1) Following approval of Shop Drawings of control equipment and prior to acceptance of control work, prepare Operating and Maintenance manuals describing operating, servicing, and maintenance requirements of control systems and equipment installed under this Section, in accordance with the General and Special Conditions of these Specifications. 2) Information contained in the manual for the above equipment to include the following:
(a) Manufacturer's catalog cuts and printed descriptive bulletins. (b) Manufacturer's installation, operating, and maintenance instruction booklets. Complete instructions regarding the operation and maintenance of equipment involved.
(c) Instrument calibration certificates.
(d) Parts list and costs.
(e) Complete nomenclature of replaceable parts, list of recommended spare parts for 12 months operation, their part numbers, current cost and name and address of the nearest vendor of replacement parts. (f) Name, address and telephone number for closest source of spare parts.
(g) Wiring and schematic diagrams.
(h) Include final record copies of shop drawings.
(i) Copy of guarantees and warranties issued for the various items of equipment, showing dates of expiration.
(j) Reduced plans, diagrams, and control schematics.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 869
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-4
(k) Copies of test results.
(l) Control System Operating Manual including: point of summary and point data base; complete printout of program listings; magnetic tape CD or DVD backup of Field Control Cabinet programs; cabinet layout; hard copy of graphic screens; hard copy of specified reports. g. A final Bill of Quantities including a separate schedule for portable equipment, if delivered as part of this work.
h. Performance, Test and Adjustment Data: Comprehensive documentation of performance verification according to parameters specified in these specifications. i. Record Drawings: Comply with Division 01, General Requirements and Section 23 00 00, HVAC Basic Requirements. Provide complete as-built submittals including "as-programmed" sequence of operation as well as final occupancy schedules.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Installer Qualifications: Company specializing in performing work of the type specified in this Section with minimum five years' experience in the local area. Installers required to have successfully completed manufacturer's control system factory training.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 SYSTEM DESCRIPTION
A. Control system referenced throughout specifications and drawings as Building Automation System (BAS), Building Management System (BMS), or Energy Management System (EMS) interchangeably consists of high-speed, peer-to-peer network of DDC controllers, control system server, and operator workstation. System to be UUKL listed if used for smoke control.
B. The base building BAS is existing. Engage with the existing base building BAS contractor to provide the complete integration of new or altered controls, as described in the contract documents. Ensure that all new work emulates the existing operational controls and operator interfaces within the base building BAS, unless specifically noted otherwise in the contract documents. Provide and commission all materials, devices, and programming necessary for new controls to integrate with existing base building BAS. Ensure that all new materials and devices are fully compatible with existing base building BAS and of equal quality.
C. System software based on server/thin-client architecture, designed around open standards of web technology. Control system server accessed using a web browser over control system network, Owner's local area network, and remotely over Internet (through Owner's LAN). Intent of thin-client architecture is to provide operators complete access to control system via web browser. No special software other than web browser required to access graphics, point displays, and trends.
D. Local Area Network (LAN) either 10 or 100 Mpbs Ethernet network.
E. System will consist of open architecture that is capable of:
1. High speed Ethernet communication using TCP/IP protocol.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 870
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-5
2. Native BACnet communications according to ANSI / ASHRAE Standard 135, latest edition. Provide necessary BACnet-compliant hardware and software to meet the system's functional specifications. Controller devices must be BTL tested and listed by an official BACnet Testing Laboratory and have the BTL mark issued.
F. Complete temperature control system to be DDC with electronic sensors and electronic/electric actuation valves and dampers.
G. Prepare individual hardware layouts, interconnection drawings, building riser/architecture diagram and sequence of control from the project design data. Any architecture diagrams on design drawings have been included as schematics only and are not meant to portray quantity of devices or power/data requirements.
H. Design, furnish, and install equipment cabinets, panels, data communication network infrastructure (including cables, conduits, outlets, connections, etc.) needed, and associated hardware.
I. Provide complete manufacturer's specifications for items that are supplied. Include vendor name and model number of every item supplied.
J. Provide a comprehensive operator and technician training program as described in these Specifications.
K. Provide as-built documentation, operator's terminal software, diagrams, and other associated project operational documentation (such as technical manuals) on approved media, the sum total of which accurately represents the final system.
L. Provide 120V power, low voltage power, transformers, etc. for control panels, transformer panels, and BAS devices. Install per Division 26, Electrical Specifications. Power for devices within this Specification Section is solely the responsibility of the BAS Contractor.
M. Conduit and raceway systems. Provide per Division 26, Electrical Specifications.
N. Devices, components, controllers, and software to be manufacturer's most current version at the time of installation.
1.8 SYSTEM PERFORMANCE
A. Performance Standards - System conforms to following minimum standards over network connections:
1. Graphic Display: Graphic with 20 dynamic points display with current data within 10 seconds.
2. Graphic Refresh: Graphic with 20 dynamic points update with current data within 8 seconds.
3. Object Command: Devices react to command of binary object within 2 seconds. Devices begin reacting to command of analog object within 2 seconds.
4. Object Scan: Data used or displayed at controller or workstation have been current within previous 6 seconds.
5. Alarm Response Time: Object that goes into alarm is annunciated at workstation within 45 seconds.
6. Program Execution Frequency: Custom and standard applications are capable of running as often as once every 5 seconds. Select execution times consistent with mechanical process under control.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 871
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-6
7. Performance: Programmable controllers are able to completely execute DDC PID control loops at frequency adjustable down to once per second. Select execution times consistent with mechanical process under control.
8. Multiple Alarm Annunciation: Each workstation on network receive alarms within 5 seconds of other workstations.
B. Reporting Accuracy: System reports values with minimum end-to-end accuracy listed in Reporting Accuracy Table below.
1. Reporting Accuracy Table:
Measure Variable Reported Accuracy
Space Temperature Plus or Minus 1 degree F
Ducted Air Plus or Minus 1 degrees F
Water Temperature Plus or Minus 1 degree F
Delta-T Plus or Minus 0.25 degree F
Water Flow Plus or Minus 2 percent of full scale
2. Note 1: Accuracy applies to 10 percent-100 percent of scale
3. Note 2: For both absolute and differential pressure
4. Note 3: Not including utility-supplied meters
C. Control Stability and Accuracy. Control loops maintain measured variable at setpoint within tolerances listed in Control Stability and Accuracy Table below.
1. Control Stability and Accuracy Table:
Controlled Variable Control Accuracy Range of Medium
Air Pressure Plus or minus 0.2 inch
wg
0-6 inch wg
Plus or minus 0.01 inch
wg
-0.1 to 0.1 inch wg
Airflow Plus or minus 10
percent of full scale
Space Temperature Plus or minus 2.00
degrees F
Duct Temperature Plus or minus 3.0
degrees F
Fluid Pressure Plus or minus 1.5 PSI 1-150 PSI
Plus or minus 1.0 inch
wg
0-50 inch wg differential
PART 2 - PRODUCTS
2.1 NORTHERN CALIFORNIA MANUFACTURERS
A. KMC Controls
B. Duct/Spot-Type Smoke Detectors (Project with Fire Alarm System):
1. See Division 28 for Products.
2.2 COMMUNICATIONS
A. Each controller to have communication port for connection to operator interface.
1. Internetwork operator interface and value passing to be transparent to internetwork architecture.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 872
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-7
2. Operator interface connected to controller to allow operator to interface with each internetwork controller as if directly connected. Controller information such as data, status, reports, system software, and custom programs to be viewable and editable from each internetwork controller.
B. Inputs, outputs, and control variables used to integrate control strategies across multiple controllers to be readable by each controller on internetwork.
C. Operator Workstation to be capable of simultaneous direct connection and communication with BACnet/IP, OPC and TCP/IP networks without use of interposing devices such as PC or gateway with hard drive.
D. Workstations, Building Control Panels and Controllers with real-time clocks use time synchronization service. System automatically synchronizes system clocks daily from operator- designated device via internetwork. System automatically adjusts for daylight saving and standard time as applicable.
E. Wireless Network Communications:
1. Wireless communications take place using modular wireless transceivers at each device, which eliminates need for communication cabling.
2. Wireless transceiver utilizes 2.4 GHz in license free global Industrial Scientific and Medical (ISM) band.
3. Wireless transceiver is encased in plenum-rated enclosure. If application dictates, wireless transceiver is able to be installed in metal enclosure utilizing remote mounted antenna.
4. Wireless transceiver channel is factory set and capable of being field set to different channel if interference with IEEE 802.11 devices or other 2.4 GHz products is encountered.
5. Wireless transceiver is 24 VAC powered.
6. Wireless transceiver gives a visual indication that it is powered and communicating.
7. Wireless transceiver has a field-settable network identifier that allows multiple networks to occupy same channel for maximum scalability.
2.3 OPERATOR INTERFACE
A. Operator Interface: PC-based workstations reside on high-speed network with building controllers. Each workstation or each standard browser connected to server is able to access system information.
B. Hardware: Each operator workstation or web server consists of the following:
1. Computer: Hardware meets or exceeds DDC system manufacturer's recommended specifications and meet response times specified elsewhere in this document. Following hardware requirements also apply:
a. Hard disk have sufficient memory to store:
1) Required operator workstation software.
2) One year of trend data based on points specified to be trended at specified trend intervals.
b. Minimum hardware configuration includes:
1) Intel i7 Processor
2) 22-in LCD Monitor with at least 1024 x 768 Resolution 3) 8 GB of RAM
4) 48x CD-RW/DVD Optical Drive
5) 1 TB Hard Disk Drive Providing Data at 3 GB/sec
6) Ethernet 10/100 Network Interface Card
7) High Performance Graphics Card
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 873
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-8
8) Keyboard and Mouse
9) Color Inkjet Printer
10) UPS (uninterruptible power supply) installed at server, sized with sufficient capacity to allow full operation for 10 minutes or more.
C. System Software:
1. Operating System: Furnish concurrent multi-tasking operating system. Operating system also supports use of and includes other common software applications such as Microsoft Excel, Word, Microsoft Access and Adobe Acrobat. Acceptable operating systems are Windows 10 and Windows 11.
2. Dynamic Color Graphics:
a. Real-time color graphic displays dynamic and able to update displays. b. Provide operator ability to change values (setpoints) and states in system controlled equipment directly from graphic display.
c. Custom Graphics. Provide custom graphics generation package. d. Graphics Library. Furnish library of standard HVAC equipment graphics and include standard symbols for fans, pumps, coils, valves, piping, dampers, and ductwork.
3. Software to be manufacturer's most current version at the time of installation.
D. System Applications: Each workstation provides operator interface and offline storage of system information. Provide following applications at each workstation:
1. Automatic System Database Save and Restore: Each workstation stores on hard disk copy of current database of each Building Controller. This database automatically updated whenever change is made in any system panel.
2. Manual Database Save and Restore: System operator able to manually save or clear database and initiate download of specified database from/to any panel.
3. System Configuration: Workstation software provides method of configuring system to allow for changes or additions by users and performs following tasks:
a. Create, delete or modify control strategies.
b. Add/delete objects to system.
c. Tune control loops through adjustment of control loop parameters. d. Enable or disable control strategies.
e. Generate hard copy records of control strategies on printer. f. Select points to be alarmed and define alarm state.
g. Select points to be trended and initiate automatic recording of values. h. Start/Stop binary objects and adjust analog objects.
4. Security: Operator required to log on to system with user name and password in order to view, edit, add, or delete data. System security selectable for each operator.
5. System Diagnostics: System automatically monitor operation of workstations, printers, modems, network connections, building management panels, and controllers. Failure of any device to be annunciated.
6. Alarm Indication and Handling:
a. Workstation provides visual means of alarm indication. Alarm indication becomes highest priority regardless of application(s) running.
b. System provides and archive log of alarm messages to hard drive. Alarm messages to include description of event-initiating object, source, location and time/date of alarm.
7. Trend Logs: Operator able to define custom trend log for any data object and include interval, start time, and stop time. Trend data sampled and stored on building controller panel, is archived on hard disk, and is retrievable for use in spreadsheets and standard database programs.
a. System server to periodically gather historically recorded data stored in the building controllers and archive the information. Archived files to be appended with new sample data, allowing samples to be accumulated.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 874
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-9
b. Software to be included that is capable of graphing the trend logged object data.
Software capable of creating two-axis (x,y) graphs that display object values relative to time.
c. Operator able to change trend log setup information. This includes the information to be logged as well as the interval at which it is to be logged. Input, output, and value object types in the system may be logged. Provide operations password protected. Setup and viewing may be accessed directly from any graphics on which object is displayed.
d. BAS Contractor to enable trending for any system points (physical or virtual) as directed by the Engineer, Owner or Cx Authority (Commissioning Authority). There will be no limit on the number of trended points the BAS Contractor is to set up.
BAS Contractor will modify trend setup parameters as directed by the Commissioning Authority during testing. BAS Contractor to be proactive and enable trending for major system points during system startup/programming. BAS Contractor is not to wait for direction to begin trending points. Trend data for each point to be archived on the main server for a minimum of one year. Trend data archiving to be enabled immediately upon trend setup, or as soon as communication between the field panel and sever is established. Trend data uploads from field panel to server set up to be automatically performed with sufficient frequency to ensure no data gaps or loss of trend data. e. Trend points as identified in the points list. Provide system specific trend data in two-axis (x,y) graphs that display object values relative to time to Engineer, Owner, or Commissioning Authority.
8. Standard Reports: Standard system reports provided for this project. Provide ability for Owner to readily customize these reports for this project:
a. Objects: System (or subsystem) objects and their current values. b. Logs:
1) Alarm History
2) System Messages
3) System Events
4) Trends
9. Electrical, Gas, and Weather Report:
a. System server capable of periodically gathering energy log data stored in the field equipment and archive the information. Archive files appended with new data, allowing data to be accumulated.
b. Operator able to change the energy log setup information as well. This includes the meters to be logged, meter pulse value, and the type of energy units to be logged. Meters monitored by the system may be logged.
c. System to display archived data in tabular format form for both consumption and peak values. Data shown in hourly, daily, weekly, monthly and yearly formats. In each format the user shall be able to select a specific period of data to view. d. Electrical Meter Report: Provide monthly report showing daily electrical consumption and peak electrical demand with time and date stamp for each building meter and for each electrical sub-meter on individual building panels, circuits, equipment (such as chillers), and variable frequency drives. Provide an annual (12-month) report showing monthly electrical consumption and peak electrical demand with time and date stamp for each individual meter. e. Gas Meter Report: Provide monthly report showing daily natural gas consumption for each meter and sub-meter. Provide annual (12-month) report that shows monthly consumption for each meter.
f. Weather Data Report: Provide monthly report showing daily minimum, maximum, and average outdoor air temperature (dry bulb, wet bulb) and humidity. Provide annual (12-month) report showing minimum, maximum, and average outdoor air temperature for month.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 875
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-10
E. Interfaces to Third Party Systems: BAS connects to third party systems (VFDs, chillers, emergency generators, rooftop AC units, etc). Communication protocol specified for third party system, and BAS provides compatible protocol to assure proper two way communication.
Points, alarms, and commands displayed on BAS as indicated.
F. Workstation Applications Editors: Each PC workstation supports editing of system applications, which downloaded and executed at one or more controller panels.
2.4 CONTROLLER SOFTWARE
A. Furnish following applications software for building and energy management. Software applications reside and operate in system controllers. Software to be manufacturer's most current version at the time of installation. Software and associated functions (scheduling, optimum start/stop, etc.) noted in this specification are to be configured and enabled for this project. Incorporate into sequence of operation submittals for review prior to installation.
B. System Security:
1. User access secured using individual security passwords and user names.
2. Record user Log On/Log Off attempts.
3. Provide passwords, user names, and access assignments adjustable at the operator's terminal. Each user to have a set security level, which defines access to displays and individual objects the user may control. System to include ten separate and distinct security levels for assignment to users.
4. System to include an Auto Logout Feature that will automatically logout user when there has been no keyboard or mouse activity for a set period of time. Time period to be adjustable by System Administrator. Auto Logout may be enabled and disabled by System Administrator. Operator terminal to display message on screen that user is logged out after Auto Logout occurs.
C. Scheduling: Provide capability to schedule each object or group of objects in system.
Coordinate schedule with Owner and program accordingly. Each schedule consists of:
1. Operator's workstation to show information in easy-to-read daily format. Priority for scheduling: Events, holidays and daily with events being the highest.
2. Holiday and special event schedules to display data in calendar format. Operator able to schedule holidays and special events directly from these calendars.
3. Operator able to change information for a given weekly or exception schedule if logged on with the appropriate security access.
D. Optimum Start/Stop: Provide software and program system to start equipment on sliding schedule based upon indoor and outdoor conditions. Determine minimum time of HVAC system operation needed to satisfy space environmental requirements and also determine earliest possible time to stop mechanical systems (i.e. shut down cooling/heating and only provide ventilation one hour prior to scheduled unoccupied period). Optimum start/stop program operates in conjunction with scheduled start/stop and night setback programs.
E. Alarms:
1. Operator's workstation to provide visual means of alarm indication. The alarm dialog box to always become the top dialog box regardless of the application(s), currently running.
2. System to provide log of alarm messages. Alarm log to be archived to the hard disk of the system operator's terminal. Each entry to include a description of the event-initiating object generating the alarm. Entry to include time and date of alarm occurrence.
3. Alarm messages in user-definable text and entered either at the operator's terminal or via remote communication.
4. Each binary object set to alarm based on operator-specified state.
5. Each analog object is to have both high and low alarm limits.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 876
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-11
6. Alarms must be able to be automatically and manually disabled.
7. Alarms are routed to appropriate workstations based on time and other conditions. An alarm is able to start programs, print, be logged in event log, generate custom messages, and display graphics.
8. System have ability to dial out in event of alarm.
9. Alarm Levels:
a. Provide 5 levels of alarm as follows, and program alarm levels for every required and specified alarm:
1) Level 1: Critical/life safety.
2) Level 2: Significant equipment failure.
3) Level 3: Non-critical equipment failure/operation.
4) Level 4: Energy conservation monitor.
5) Level 5: Maintenance indication, notification.
b. Prior to training of Owner’s Authorized Representative, submit the complete Points List and suggested Alarm Levels to the Owner.
c. During training of Owner’s Authorized Representative(s):
1) Discuss Alarm Levels and the alarms currently included in the BAS. 2) Provide additional alarms without addition of new hardware points, as required by Owner’s Authorized Representative.
3) Agree with the Owner’s Authorized Representative on action(s) to be taken for each alarm level and implement same for each alarm. Said action to include visual and/or audible alarm(s) at the Operator workstation including whether Operator acknowledgement is required or not, email messages, and text messages.
F. Demand Limiting:
1. System to include demand limiting program that includes two types of load shedding.
One type of load shedding to shed/restore equipment in binary fashion based on energy usage when compared to shed and restore settings. The other type of shedding to adjust operator selected control setpoints in an analog fashion based on energy usage when compared to shed and restore settings. Shedding may be implemented independently on each and every zone or piece of equipment connected to system.
2. Status of each and every load shed program capable of being displayed on every operator terminal connected to system. Status of each load assigned to an individual shed program displayed along with the description of each load.
3. Demand-limiting program monitor building power consumption from signals generated by pulse generator (provided by BAS contractor) mounted at building power meter or from watt transducer or current transformer attached to building feeder lines.
4. Demand-limiting program predicts probable power demand so that when demand exceeds demand limit, action will be taken to reduce loads in predetermined manner.
When demand limit will not be exceeded, action will be taken to restore loads in predetermined manner.
G. Maintenance Management: System monitors equipment status and generate maintenance messages based upon user-designated run-time, starts, and/or calendar date limits. Coordinate settings with Owner.
H. Sequencing: Provide application software based upon sequences of operation specified to properly sequence designated systems. Provide points to achieve specified sequences.
I. Staggered Start: This application prevents controlled equipment from simultaneously restarting after a power outage. Order in which equipment (or groups of equipment) is started, along with time delay between starts to be user-selectable.
J. Energy Calculations: Provide software to allow instantaneous power (e.g. kW) or flow rates (e.g.
L/s (gpm)) to be accumulated and converted to energy usage data.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 877
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-12
K. Anti-Short Cycling: Binary output objects protected from short cycling by allowing minimum on- time and off-time to be selected.
L. On/Off Control with Differential: Provide algorithm that allows binary output to be cycled based on controlled variable and setpoint. Algorithm direct-acting or reverse-acting and incorporate adjustable differential.
M. Run-Time Totalization: Provide software to totalize run-times for binary input objects.
2.5 WEB BASED ACCESS
A. General Description: BAS supplier to provide web-based access to the system as part of standard installation. Provide access to user of displays of real-time data that are part of the BAS via a standard web browser. Web browser to tie into the network via Ethernet network connection. Provide web-page host that resides on the BAS network. Web page software not to require a per user licensing fee or annual fees. The web page host must be able to support at least 50 simultaneous users with the ability to expand the system to accommodate an unlimited number of users. Software to be manufacturer's most current version at time of installation.
B. Browser Technology: Browser to be standard version of Microsoft Edge (latest edition). No special vendor-supplied software needed on computers running browser. Displays viewable and the web page host to directly access real-time data from the BAS network. Data displayed in real time and update automatically without user interaction. User able to change data on displays if logged in with the appropriate user name and password.
C. Display of Data: Webpage graphics shown on browser to be replicas of the BAS displays. User is to need no additional training to understand information presented on Web pages when compared to what is shown on BAS displays. Web page displays to include animation just as BAS displays. Fans to turn, pilot lights to blink, and coils to change colors, and so on. Real-time data shown on browser web pages. This data must be directly gathered via the BACnet network and automatically updated on browser webpage displays without any user action. Data on the browser to automatically refresh as changes are detected without re-drawing the complete display. User to be able to change data from browser web page to if the user is logged on with the appropriate password. Clicking on a button or typing in a new value to change digital data.
Using pull-down menus or typing in a new value to change analog data. Data displays navigated using pushbuttons on the displays that are simply clicked on with the mouse to select a new display. Alternatively, the standard back and forward buttons of the browser can be used for display navigation.
D. Web Page Generation: Web pages generated automatically from the BAS displays that reside on the BAS server. User to access web page host via the network and initiate a web page generation utility that automatically takes the BAS displays and turns them into web pages. The web pages generated are automatically installed on the web page host for access via any computer's standard browser. Any system that requires use of an HTML editor for generation of web pages will not be considered.
E. Password Security and Activity Log: Access via web browser to utilize the same hierarchical security scheme as BAS system. User asked to log in once the browser makes connection to web page host. Once the user logs in, any changes that are made are to be tracked by the BAS system. User shall be able to change only those items that the user has authority to change. A user activity report to show any activity of the users that have logged in to the system regardless of whether those changes were made using a browser or via the BAS workstation.
F. Communication: Web-page host to communicate using the specified protocol standard to devices on the BAS network.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 878
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-13
2.6 BAS GRAPHICS
A. Develop customized graphics showing the project building(s) and their floor plans, mechanical and electrical equipment, flow and control diagrams, and other relevant features on Workstation graphic screens. Associated input, output, and virtual objects (e.g., temperature and pressure setpoints) listed in the Sequence of Operation, and shown on the Input/Output Objects List included in the graphic screens and bound to the database. Real-time value of objects updated on the display of each graphic automatically. For projects where existing campus and/or building controls systems exist, replicate graphics used in the existing BAS graphics screens.
B. Graphics to have links to the Print function and to display a Standard Legend in the corner of the graphic. Graphics, except pop-ups, to have the date and time displayed in the upper corner of the graphic. Each graphic titled.
C. Weather: Graphics, except pop-ups, to have the outdoor temperature and humidity in the upper corner of the graphic.
D. Alarms: System and component summary alarms located near the top of each relevant graphic screen. Provide links to the associated system/component as part of these tags to assist trouble shooting. Other alarms placed near the associated system/device as depicted in the graphic.
Provide text and color of information tags that describe each object and alarm value consistent with a graphics color legend.
E. The following graphics provided as a minimum:
1. A building graphic, typically a photograph of the building, with links to each floor plan and other links as defined below.
2. A central plant graphic with equipment (chillers, boilers, pumps, heat exchangers, storage tanks, etc.), temperature sensors, pressure sensors, flow sensors and refrigeration leak detectors. The central plant graphic to have links to each building on the campus.
3. Central equipment such as air handler, package rooftop equipment, supply fans, exhaust fans, and smoke control systems.
4. Floor plans of each floor, with temperature sensors, pressure sensors, temperature control zones, heating/cooling zones, ventilation zones, and supply air zones identified.
Rooms grouped on a graphic only to the extent that detailed and complete sensing information can be comfortably viewed by an operator and the bound points updated in less than 10 seconds. Each zone to have a temperature symbol that changes color over the range from low (blue) through normal (green) to high (red) and indicate an alarm (flashing red). The zone temperature and or pressure symbol(s) to be a link to a zone control pop-up graphic. Individual floor plan graphics to provide links to related mechanical systems. The mechanical room plan graphics to show the relative location of, and provide links to, either the equipment pop-up or flow and control graphic for mechanical equipment monitored or controlled by the BAS.
5. Pop-up graphics provided for each zone control system showing a flow diagram and related monitoring and control points and system parameters. Pop-up graphics provided for each piece of equipment that is not shown on a flow and control graphic.
6. Flow and control diagrams for each system including but not limited to central plant, fan coils, generators, packaged equipment, chilled water systems, heating hot water systems, heat exchangers, pumps, storage tanks, zone terminal units, isolation room systems, smoke damper status, combination fire and smoke damper status, and ventilation systems. The flow and control graphics to have parameters grouped in the lower portion of the graphics. Standard equipment graphics used. Pumps, fans, dampers and other elements to dynamically indicate their state (i.e. pumps and fans to rotate when on and damper positions to dynamically adjust and be shown in their current position, etc.). System flow and control graphics displayed in a general left to right flow or loop arrangement. Return and exhaust air flow shown on top and return water shown on the bottom of the graphic.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 879
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-14
7. Individual equipment/component screens showing sensing and control information available for each device provided.
F. Penetration: The graphic interface to consistently apply a convention whereby a left-click to always penetrate to more detailed information. The text windows to represent the deepest level of penetration. A right-click to always produce a menu of options that are specific to the item selected.
G. Navigation: Graphics organized to provide a "branching structure" that allows an operator to move from a "macro view" to a "micro view" and return. These links to other associated graphics, or allow a return to a previous macro view, provided and arranged horizontally along the bottom of each graphic screen. From left to right, the graphic links as follows: site/building map, building/trailer floor plans, and major mechanical systems at each building. Pop-up right click menus provided as needed on the lower button bar to allow for uncluttered navigation.
H. Clutter Minimization: Each graphic to have separate check boxes in the lower right corner that show/hide setpoints, alarms/safeties, and devices/equipment.
I. Templates: To the maximum extent possible, use standard graphics as templates to provide a consistent look throughout the interface.
J. Color Scheme: The graphics to use dynamic color changes to communicate equipment type, or object status consistent with the graphics color legend.
K. Symbols and Animations: Fans, pumps, dampers, coils, and generation equipment to be dynamic symbols indicating rotation, state, or position, movement, flow, etc.
L. Macros: When macros are used to add functionality to the graphics, detailed documentation provided.
M. Configure Mode: Access to “Configure Mode” for editing of the graphics password protected to prevent unauthorized changes to the graphics. This password supplied to the appropriate personnel.
N. Graphics Version: Graphics provided in the most current format available at time of control system programming.
O. Points and graphics checked for the proper binding and graphic programming, settings to ensure that the correct system, location, point values and dynamics are shown in the proper location and rotate in the proper directions.
P. After graphics have been accepted, provide, on a CD ROM in an agreed upon file structure. If the graphics have active-x controls or other files that must be placed outside the graphics folder structure a set-up program provided on the disk to place the files in the correct locations.
2.7 APPLICATION SPECIFIC CONTROLLER - TERMINAL UNIT CONTROLLERS A. Provide one application controller for each terminal unit that adequately covers objects listed in object list for unit. Controllers to interface to building controller via LAN using specified protocol.
Controllers to include on board flow sensor, inputs, outputs and programmable, self-contained logic program as needed for control of units.
B. Application controllers to include universal inputs with 10-bit resolution that can accept thermistors, 0-5 VDC, and dry contact signals. Inputs on controller may be either analog or digital. Controller to also include support and modifiable programming for interface to intelligent October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 880
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-15
room sensor with digital display (digital display to indicate setpoint only). Controller to also include binary outputs on board. For applications using variable speed parallel fans, provide a single analog output selectable for 0-10 V or 0-20 mA control signals. Application controller to include microprocessor driven, self calibrating flow sensor for use in pressure independent control logic. Terminal units controlled using pressure independent control algorithms and flow readings to be in CFM. Flow sensor and controller to have control range of 0.004 in.wc. to 1.5 in.wc. with an accuracy of +5 percent at 1 in.wc.
C. Program sequences stored on board application controller in EEPROM. No batteries needed to retain logic program. Program sequences executed by controller 10 times per second and capable of multiple PI loops for control of multiple devices. Provide programming of application controller completely modifiable in the field over installed specified protocol LANs or remotely via modem interface. Operator to program logic sequences by graphically moving function blocks on screen and tying blocks together on screen. Application controller programmed using the same programming tool as Building Controller and as described in Operator Workstation article.
D. Application controller to include support for intelligent room sensor. Display on room sensor programmable at application controller and include an operating mode and a field service mode.
Button functions and display data programmable to show specific controller data in each mode based on which button is pressed on the sensor. See sequence for specific display requirements for intelligent room sensor.
E. Provide duct temperature sensor at discharge of each terminal unit that is connected to controller for reporting back to operator workstation. Provide analog inputs for the duct temperatures.
2.8 INPUT/OUTPUT INTERFACE
A. Input/output points protected such that shorting of point to itself, to another point, or to ground will cause no damage to controller. Input and output points protected from voltage up to 24 V.
B. Binary inputs (BI or DI) allow monitoring of On/Off signals from remote devices. Binary inputs sense “dry contact” closure without external power (other than that provided by controller) being applied.
C. Pulse accumulation input objects accept up to 10 pulses per second for pulse accumulation.
D. Analog inputs (AI) allow monitoring of low-voltage (0 to 10 VDC), current (4 to 20 mA), or resistance signals (thermistor, RTD).
E. Binary outputs (BO or DO) provide for On/Off operation or pulsed low-voltage signal for pulse width modulation control. Binary outputs on building and custom application controllers have three-position (On/Off/Auto) override switches and status lights. Outputs selectable for either normally open or normally closed operation.
F. Analog outputs (AO) provide a modulating signal for control of end devices. Outputs provide either a 0 to 10 VDC or a 4 to 20 mA signal as required to provide proper control of the output device. Analog outputs on building controllers have status lights and two-position (AUTO/MANUAL) switch and adjustable potentiometer for manual override. Analog outputs not exhibit drift of greater than 0.4 percent of range per year.
G. Tri-State Outputs. Provide tri-state outputs (two coordinated binary outputs) for control of three- point floating type electronic actuators without feedback. Use of three-point floating devices limited to zone control and terminal unit control applications (VAV terminal units, duct-mounted October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 881
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-16
heating coils, zone dampers, radiation, etc.). Control algorithms run zone actuator to one end of its stroke once every 24 hours for verification of operator tracking.
2.9 POWER SUPPLIES AND LINE FILTERING
A. Control transformers UL listed. Furnish Class 2 current-limiting type or furnish over-current protection in both primary and secondary circuits. Limit connected loads to 80 percent of rated capacity.
B. DC power supply output match output current and voltage requirements. Unit operates between 32 degrees F and 120 degrees F.
C. Line voltage units UL listed and CSA approved.
D. Power line filtering. Provide transient voltage and surge suppression for workstations and controllers.
2.10 CONTROL PANELS
A. Control Panels:
1. Enclosures may be NEMA 1 when located in a clean, dry, indoor environment. Indoor enclosures to be NEMA 12 when installed in other than a clean environment. Outdoor enclosures must be NEMA 3R. Provide (hinged door) key-lock latch and removable subpanels. Single key common to field panels and subpanels. In existing campus or building settings, key lock to match existing keys.
2. Interconnections between internal and face-mounted devices prewired with color-coded stranded conductors neatly installed in plastic troughs and/or tie-wrapped. Terminals for field connections UL listed for 600 volt service, individually identified per control/ interlock drawings, with adequate clearance for field wiring. Control terminations for field connection individually identified per control drawings.
3. Provide ON/OFF power switch with overcurrent protection for control power sources to each local panel.
4. Provide laminated plastic nameplates for enclosures in any mechanical room or electrical room labeled with TCP number. Laminated plastic to be 1/8-inch thick sized appropriately to make label easy to read.
2.11 AUXILIARY CONTROL DEVICES
A. Temperature Instruments:
1. Room Temperature Sensors: Thermistor or platinum RTD type with accuracy of plus or minus 0.5 degrees F at 70 degrees F; operating range 30-120 degrees F; linear signal; single point sensing element in wall-mounted ventilated enclosure with insulating back plate if mounted on exterior wall; plug-in portable operators terminal port.
2. Room Temperature Sensor: Thermistor or platinum RTD type with accuracy of plus or minus 0.5 degrees F at 70 degrees F; operating range 30-120 degrees F; linear signal; single point sensing element in wall-mounted ventilated enclosure with insulating back plate if mounted on exterior wall; push button for occupancy override; digital setpoint adjustment plus or minus 2 degrees F in both directions; LCD temperature display indicating setpoint only. Setpoint adjustment to revert to building programmed standard temperature upon next building occupancy schedule change (user adjustable). Room temperature sensor may have integral space carbon dioxide sensor with minimum performance characteristics identified within this specification.
3. Averaging Duct Temperature Sensors: Thermistor or platinum RTD element with accuracy of plus or minus 0.5 degrees F at 32 degrees F, consisting of array of single point sensing elements, securely mounted in duct or plenum; operating range 20-120 October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 882
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-17
degrees F; linear signal; 1-foot element per 2 SF of duct cross-sectional area. Use when duct is 9 SF or larger or where air is subject to temperature stratification.
4. Probe Duct Temperature Sensors: Thermistor or platinum RTD element with accuracy of plus or minus 0.5 degrees F at 32 degrees F, consisting of single point sensing elements, securely mounted in duct or plenum; operating range 20-120 degrees F; linear signal; 24- inch rigid probe. Use where duct is less than 9 SF cross-sectional area.
B. Pressure Transmitters and Transducers:
1. Transducer have linear output signal; field adjustable zero and span. Sensing elements withstand continuous operating conditions of positive or negative pressure 50 percent greater than calibrated span without damage.
2. Differential Pressure Switch: Setpoint adjustable with operating range of 0.5 to 12-inch WG for fans, and 5- to 30-feet WC for pumps. Switches UL listed; SPDT snap-acting; pilot duty rated (125 VA minimum); NEMA 1 enclosure; scale range and differential suitable for intended application.
3. Filter Differential Pressure Switch: Setpoint adjustable with operating range of 0.1- to 5- inch WG; auto reset. Contactor to close when pressure differential setting is met or exceeded. Provide mounting bracket, metallic tubing and appropriate fittings for connection to duct or air-handling unit.
4. Duct Static Differential Pressure Transducer: Operating range 0- to 5-inch WC for duct mounted transmitter; ceramic capacitive sensing element with probe securely mounted in duct; digital input terminal and push button to zero output. Accuracy plus or minus 1 percent of full scale; maximum response time 2 seconds.
5. Piping Pressure Transmitter: Operating range 0 to 50 PSIG, linear signal; stainless steel diaphragm; digital input terminal and push button to zero output. Accuracy plus or minus 1 percent of full scale.
C. Motorized Control Dampers:
1. Performance: Maximum leakage of 3 CFM/SF at 1-inch WG differential pressure, AMCA Class 1A, maximum pressure rating of 13-inch WG differential pressure, maximum velocity of 6,000 fpm, -72 degrees F to 275 degrees F temperature rating.
2. Multi-blade type, except where either dimension is less than 10-inch single blade may be used. Maximum blade length to be 48-inch.
3. Provide parallel blades for modulating mixing service and opposed blades for throttling service.
4. Blades to be interlocking; minimum 16 gauge galvanized steel; compression type edge seals and side seating stops. In copper, aluminum and stainless steel duct work, damper material matches duct work material.
5. Damper blades are reinforced, have continuous full length axle shafts, axle to axle linkage, and/or operating “jackshafts” as required to provide coordinated tracking of blades.
6. Bearings: Self-lubricating stainless steel sleeve or Celcon bearing.
7. Dampers over 25 SF in area to be in two or more sections, with interconnected blades.
8. Provide remote damper blade position status with binary input.
9. Tested in accordance with AMCA Standard No. 500.
D. Motorized Control Valves:
1. Body pressure rating and connection type construction conforms to pipe, fitting and valve schedules.
2. Fluid valve close-off ratings and spring ranges operate at maximum flows and maximum available pump heads scheduled without leakage.
3. Screwed ends except 2-1/2-inch and larger valves with flanged ends.
4. Motorized Control Valves (Pressure Independent Control Valves):
a. Description: Valve consists of pressure compensating cartridge, actuated ball or Y pattern globe valve, and multiple pressure/temperature test ports in a single valve housing.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 883
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-18
b. Construction: Rated for no less than 125 PSI and 250 degrees F. 2-inch and Smaller: brass with threaded connections. 2-1/2-inch and larger: cast iron with flanged connections.
c. Performance: Flow rate controlled linearly to within 5 percent of target flow rate, for any actuator position (0 to 100 percent), over an operating differential pressure range of 6 to 50 PSI across the valve. Provide valve with integral test ports to verify pressure differential.
d. Manufacturers: Belimo, Danfoss, Flow Control Industries, Griswold, Tour and Andersson, or approved equivalent.
5. Fluid three-way valves globe valves with linear plug with composition disc for tight shutoff.
6. Pressure drop equal to twice pressure drop through heat exchanger (load), 50 percent of pressure difference between supply and return mains, or 5 PSI, whichever is greater, except two-position valves to be line size.
7. Bubble-tight line size butterfly valves acceptable on 2-1/2-inch lines and above for two- position action only; cast iron body; aluminum bronze disc; EPDM seat, 200 PSI wg.
E. Electronic Pressure Independent Control Valves:
1. General: Assembly consisting of electric control valve, flow measuring station and control to provide constant flow regardless of varying pressure differentials. Flow setpoint electronically adjustable.
2. Communication: BACnet MS/TP.
3. Control Type: Modulating.
4. Fluid: Chilled or hot water, up to 60 percent glycol.
5. Materials:
a. Valve body: Nickel plated brass (1/2-inch to 2-inch), cast iron (2-1/2-inch to 6-inch). b. Sensor housing: Nickel plated forged brass (1/2-inch to 2-inch), ductile iron (2-1/2- inch to 6-inch).
c. Ball: Stainless steel.
d. Stem: Stainless steel.
e. Characterized disc: Tefzel (1/2-inch to 2-inch), stainless steel (2-1/2-inch to 6- inch).
6. Fluid Temperature Range: 14F to 250F.
7. Pressure Rating: 360 PSIG (1/2-inch to 2-inch), ANSI 125, Class B (2-1/2-inch to 6-inch.
8. Close-off Pressure: 200 PSID (1/2-inch to 2-inch), 100 PSID (2-1/2-inch to 6-inch).
9. Leakage: 0 percent.
10. Rangeability: 100:1.
11. Flow control tolerance: +/-5 percent.
12. Flow measurement tolerance: +/-2 percent.
13. Connections: Flanged or threaded to match piping.
14. Power Loss Fail Position: Last position.
15. Actuator: Manual override, electrically reversable.
16. Listing: UL or CSA.
17. Communication feedback: Actual flow, valve position.
18. Manufacturer: Belimo ePIV or approved equivalent.
F. Electric Damper/Valve Actuators:
1. Provide mechanical or electronic stall protection for each actuator.
2. Where indicated provide internal mechanical, spring-return mechanism or provide uninterruptible power supply (UPS). Non-spring-return actuators have external manual gear release to position damper/valve when actuator is not powered.
3. Proportional actuators accepts 0 to 10 VDC or 0 to 20 mA control signal and provide 2 to 10 VDC or 4 to 20 mA operating range.
4. Actuator sized for torque required plus 25 percent; UL or CSA listed; electronic current overload protection.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 884
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-19
5. For system differential pressure control valves, provide fast acting valve actuator with valve open or close time of 30 to 60 seconds.
6. VAV Actuators: Actuators proportional 24 VAC actuators using a 4 to 20 mA range of control signals; stops automatically at end of travel; include permanently lubricated gear train.
7. Actuators for emergency generator damper control rated for 350 degree F. maximum operating temperature and capable to drive fully open and close within 15 seconds.
G. Room Pressure Monitor: Active room pressure monitor and alarm which provides local audio alarm and analog and alarm signals to DDC system. Wall mounted panel with LED differential pressure readout; audible and visual alarm; mute button; range of -0.05 to +0.05-inch WC; accurate to 1 percent of full scale; repeatability plus or minus 1.0 percent of full scale per year, alarm delay ability between 0-30 seconds. Provide door switch to deactivate alarm when space door(s) are open. Input status from BAS to deactivate alarm in unoccupied or shutdown modes.
Phoenix Controls APM100.
H. Wall Mounted Space Carbon Dioxide Sensor:
1. Sensor to employ non-dispersive infrared technology (N.D.I.R.).
2. Sensor Repeatability: Plus or minus 20 ppm. 0-2000.
3. Sensor Accuracy: Less than or equal to 75 ppm over 0-1500 ppm range.
4. Sensor Response Time: Less than 1 minute.
5. Sensor to employ reference channel design for long-term stability.
6. Sensor to have field selectable 0-10VDC, or 4-20mA outputs.
7. Sensor power requirement less than 3W.
8. Sensor Input Voltage: 20 to 30VAC/DC.
9. Sensor Operating Temperature Range: 0 degrees C to 50 degrees C.
10. Sensor to have models for wall mounting or duct mounting.
11. Sensor to provide at least a 1-year factory warranty from date of purchase.
12. Sensor to match cover in color and look to temperature sensor.
13. Sensor to have display.
14. Manufacturers:
a. Telaire
b. Vaisala
c. Veris
I. Occupancy Sensor: Dual technology infrared and ultrasonic sensing device, ceiling or wall mounted, built-in self-adjusting settings, timer settings of 30 seconds to 30 minutes, with manual and automatic modes. Provide multiple devices in parallel when area served is greater than a single device sensing capability. Provide integral power pack, 120 VAC input, 24 VDC output, with manual override switch. Leviton OSC-MOW series.
J. Paddle Type Flow Switches: Paddle type switches (water service only) UL listed, SPDT snap- acting with pilot duty rating (125 VA minimum) and have adjustable sensitivity with NEMA 1 enclosure.
K. Relays:
1. Control relays UL listed plug-in type with dust cover and LED “energized” indicator.
Contact rating, configuration, and coil voltage to be suitable for application.
2. Time delay relays UL listed solid-state plug-in type with adjustable time delay. Delay adjustable plus or minus 200 percent (minimum) from setpoint or as indicated. Contact rating, configuration, and coil voltage to be suitable for application. Provide NEMA 1 enclosure when not installed in local control panel.
L. Override Timers: Override timers spring-wound line voltage, UL Listed, with contact rating and configuration as required by application. Provide 0-to-6-hour calibrated dial unless otherwise October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 885
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-20
specified. Timer suitable for flush mounting on control panel face and located on local control panels or where shown.
M. Current Transmitters:
1. AC current transmitters are self-powered, combination split-core current transformer type with built-in rectifier and high-gain servo amplifier with 4 to 20 mA two-wire output. Unit range compatible with actual applied span of current value, with internal zero and span adjustment and plus or minus 1 percent full-scale accuracy at 500 ohm maximum burden.
2. Transmitter meets or exceeds ANSI/ISA S50.1 requirements and UL/CSA recognized.
3. Unit split-core type for clamp-on installation on existing wiring.
N. Current Transformers: AC current transformers UL/CSA recognized and completely encased (except for terminals) in approved plastic material; plus or minus 1 percent accuracy at 5 A full- scale.
O. Voltage Transmitters: AC voltage; self-powered single-loop (two-wire) type; 4 to 20 mA output with zero and span adjustment; UL/CSA recognized at 600 VAC rating and meet or exceed ANSI/ISA S50.1. Ranges include 100 to 130 VAC, 200 to 250 VAC, 250 to 330 VAC, and 400 to 600 VAC full-scale, adjustable, with plus or minus 1 percent full-scale accuracy with 500 ohm maximum burden.
P. Voltage Transformers: AC voltage transformers UL/CSA recognized, 600 VAC rated; built-in fuse protection; suitable for ambient temperatures of 40 degrees F to 130 degrees F; plus or minus 0.5 percent accuracy at 24 VAC and a 5 VA load.
Q. Power Monitors: Selectable rate pulse output for kWh reading; 4-20 mA output for kW reading; N.O. alarm contact; ability to operate with 5.0 amp current inputs or 0-0.33 volt inputs; plus 1.0 percent full-scale true RMS power accuracy; plus 0.5 Hz, voltage input range 120-600 V, and auto range select; NEMA 1 enclosure. Current transformers having a 0.5 percent FS accuracy, 600 VAC isolation voltage with 0-0.33 V output. If 0-5 A current transformers are provided, a three-phase disconnect/shorting switch assembly is required.
R. Overflow Switch: Insertion flow sensor, brass, impeller flow design with analog transmitter unit.
Data Industrial Model 220BR.
S. Ultrasonic Level Transmitter: Non-contact measuring device for liquid level; distance ranges from 4-feet to 32-feet; fail-safe intelligence with diagnostic feedback for troubleshooting; automatic temperature compensation; 24VDC; accuracy plus 0.15 percent of span in air. Kele LU Series.
T. Pressure-Electric (PE) Switches: Metal or neoprene diaphragm actuated; operating pressure rated 0-25 PSIG; calibrated scale setpoint range of 2-18 PSIG minimum; UL listed. Provide one- or two-stage switch action SPDT, DPST, or DPDT, as required by application. Electrically rated for pilot duty service (125 VA minimum) and/or for motor control. Permanent indicating gauge on each pneumatic signal line to PE switches.
U. Electric Solenoid Operated Pneumatic (EP) Valve: EP valves three part operation - common, normally open, and normally closed; rated for 25 PSIG when used in control system operation at 20 PSIG or less or rated at 150 PSIG when used in control system operation from 25 to 100 PSIG.
V. Electro-Pneumatic (E/P) Transducers: Electronic/pneumatic transducer provides proportional 3 to 15 PSIG output signal from either 4 to 20 mA or 0 to 10 VDC analog control input. E/P transducer equipped with following features:
1. Separate Span and Zero Adjustments
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 886
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-21
2. Manual Output Adjustments
3. Pressure Gauge Assembly
4. Feedback Loop Control
5. Air Consumption of 0.05 L/s (0.1 scfm) at Mid-Range
W. End Switches: Turret head Type SPDT. Schneider Electric/Square D Class 9007, Type C54B2, or approved equivalent.
2.12 WIRING AND RACEWAYS
A. General: Provide copper wiring, plenum cable, and raceways as specified in applicable Sections of Division 26, Electrical.
B. Insulated wire to be copper conductors, UL labeled for 90 degrees C minimum service.
C. Field panels and controllers to be supplied by building emergency power system where systems being monitored or controlled are on emergency power.
D. Run control wiring as follows:
1. Mechanical Rooms: In conduit.
2. Exposed in Building Spaces: In conduit.
3. Concealed in Building Walls and Ceilings: Plenum rated cable.
4. Concealed in Building Ceilings: Plenum rated cable in cable tray.
E. Field and Subfield Panels: Voltage in panels not-to-exceed 120 volts.
F. Motor Control Centers: Responsibility for correct voltage of holding coils and starter wiring in pre-wired motor control centers interfacing with automatic controls is included hereunder.
G. Wiring for BAS systems communications buses two conductor minimum 18 gauge foil-shielded, stranded twisted pair cable rated at 300 VDC or more than 80 degrees C.
2.13 SMOKE DETECTION (FOR PROJECTS WITH A FIRE ALARM SYSTEM) A. See Division 28 for Products.
PART 3 - EXECUTION
3.1 DEMOLITION
A. Terminal Devices: Remove terminal sensors, actuators and controls as indicated on drawings and as required to accommodate scope of mechanical work shown on drawings and described in specifications. Remove pneumatic piping and cap with hardware as appropriate. Remove wiring and conduit associated with devices. Do not leave any unused abandoned piping or wiring in space. Remove pneumatic piping, wiring and conduits, including all appurtenances back to the main.
B. Graphics and Programming: Remove symbols from control system graphics associated with deleted terminal elements. Modify programming code to delete alarms, control loops, etc., associated with deleted terminal devices.
3.2 EXAMINATION
A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 887
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-22
B. Notify the Owner's Authorized Representative in writing of conditions detrimental to the proper and timely completion of the work.
C. Do not begin work until unsatisfactory conditions are resolved.
3.3 CONTROL SYSTEM CHECKOUT AND TESTING
A. Testing completed before Owner's Authorized Representative is notified of system demonstration.
B. Calibrate and prepare for service of instruments, controls, and accessory equipment furnished under this specification.
C. Verify that control wiring is properly connected and free of shorts and ground faults.
D. Enable control systems and verify calibration and operation of input and output devices.
E. Verify that system operation adheres to sequences of operation.
F. Commissioning and Verification: In addition to commissioning requirements specified elsewhere, provide the following commissioning on the HVAC instrumentation and controls system:
1. Control systems completely commissioned to ensure aspects of the system are operating as intended and at optimum tuning.
2. Wiring connections verified and traced from field device to panel to ensure proper connections.
3. Measured values verified by a hand held calibrated device to validate that value indicated by the control system is in fact the actual measured value.
4. Loops properly tuned to obtain the desired control value. Each loop to be "upset" and put back in control to demonstrate its ability to stabilize quickly.
5. Provide a final point-by-point report submitted that indicates the date of each verification, the results, and initialed on each page by the person performing the reading.
3.4 ACCEPTANCE TESTING AND TRAINING
A. Site Testing:
1. Contractor provides personnel, equipment, instrumentation, and supplies necessary to perform testing. Owner or Owner's Authorized Representative will witness and sign off on acceptance testing.
2. Contractor demonstrates compliance of completed control system with Contract Documents. Using approved test plan, physical and functional requirements of project demonstrated.
B. Training:
1. General: Contractor conducts training courses for up to three other designated personnel in operation and maintenance of system. Training manuals provided for each trainee, with two additional copies provided for archival at project site. Manuals include detailed description of subject matter for each lesson. Copies of audiovisuals delivered to Owner.
Training day is defined as 8 hours of classroom instruction, including two 15-minute breaks and excluding lunch time, Monday through Friday, during normal first shift in effect at training facility. Notification of any planned training given to Owner's Authorized Representative at least 15 days prior to training.
2. Operator's Training I: First course taught at supplier's facility for period of one training day. Upon completion, each student should be able to perform elementary operations with guidance and describe general hardware architecture and functionality of system.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 888
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-23
3. Operator's Training II: Second course taught at project site for a period of one training day after completion of contractor's field testing. Course includes instruction on specific hardware configuration of installed system and specific instructions for operating installed system. Upon completion, each student should be able to start system, operate the system, recover system after failure, and describe specific hardware architecture and operation of system.
4. Operator's Training III: Third course taught at project site for period of one training day no later than six months after completion of the acceptance test. Course will be structured to address specific topics that students need to discuss and to answer questions concerning operation of system. Upon completion, students should be fully proficient in system operation and have no unanswered questions regarding operation of installed system.
3.5 COMMUNICATION WIRING
A. Follow manufacturer's installation recommendations for communication cabling.
B. Verify integrity of network following cable installation.
C. Communication wiring unspliced length when that length is commercially available; labeled to indicate origination and destination data.
D. Grounding of coaxial cable in accordance with NEC regulations article on “Communications Circuits, Cable, and Protector Grounding.”
3.6 WIRING AND RACEWAYS
A. Provide electrical wiring required to control systems specified in this Section. Control and interlock wiring complies with national, state and local electrical codes and Division 26, Electrical of this specification.
B. Power wiring required for building control panel(s) to be dedicated circuit(s).
C. Verify location of operator work station with Owner prior to installation.
D. NEC Class 1 (line voltage) wiring UL Listed in approved raceway according to NEC and Division 26, Electrical requirements.
E. Low-voltage wiring meets NEC Class 2 requirements. (Low-voltage power circuits subfused when required to meet Class 2 current limit.)
F. Where NEC Class 2 (current-limited) wires are in concealed and accessible locations, including ceiling return air plenums, approved cables not in raceway may be used provided that cables are UL listed for intended application.
G. Do not install Class 2 wiring in raceway containing Class 1 wiring. Boxes and panels containing high-voltage wiring and equipment may not be used for low-voltage wiring except for purpose of interfacing (e.g., relays and transformers).
H. Where Class 2 wiring is run exposed, wiring run parallel along surface or perpendicular to it and tied at 10 foot intervals.
I. Where plenum cables are used without raceway, support from structural members. Do not support cables with ductwork, electrical raceways, piping, or ceiling suspension systems.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 889
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-24
J. Make wire-to-device connections at terminal block or terminal strip. Make wire-to-wire connections at terminal block.
K. Maximum allowable voltage for control wiring 24 V. If only higher voltages are available, provide step-down transformers.
L. Wiring installed as continuous lengths, with no splices permitted between termination points.
M. Install plenum wiring in sleeves where it passes through walls and floors. Maintain fire rating at penetrations.
N. Include one pull string in each raceway 1-inch or larger.
O. Control and status relays are to be located in designated enclosures. Enclosures include packaged equipment control panels unless they also contain Class 1 starters.
P. Install raceway to maintain a minimum clearance of 6-inches from high-temperature equipment (e.g., steam pipes or flues).
Q. Secure raceways with raceway clamps fastened to structure and spaced according to code requirements. Raceways and pull boxes may not be hung on flexible duct strap or tie rods.
Raceways may not be run on or attached to ductwork.
R. Install insulated bushings on raceway ends and openings to enclosures. Seal top end of vertical raceways.
S. Flexible metal raceways and liquid-tight, flexible metal raceways not-to-exceed 3-feet in length and be supported at each end. In areas exposed to moisture, including chiller and boiler rooms, liquid-tight, flexible metal raceways to be used.
T. Raceway must be rigidly installed, adequately supported, properly reamed at both ends, and left clean and free of obstructions. Raceway sections joined with couplings. Terminations made with fittings at boxes.
U. Input and output terminations to be labeled at the controller to identify if they are AI, DI, AO, DO, and function (i.e. pump start, OM Sensor).
3.7 INSTALLATION OF AUXILIARY CONTROL DEVICES
A. General:
1. Install sensors and thermostats in accordance with manufacturer's recommendations.
2. Room sensors and thermostats installed at 48-inches AFF to top of sensor on concealed junction boxes properly supported by wall framing at the locations shown on the Drawings.
3. Low-limit sensors used in mixing plenums installed in a serpentine manner horizontally across duct.
4. Pipe-mounted temperature sensors installed in wells with heat-conducting fluid in thermal wells.
5. Install outdoor air temperature sensors on north facing wall or screen, complete with sun shield at designated location.
6. Chiller or Heat Pump differential pressure sensor: Locate immediately at the chiller or heat pump piping connections, before any fittings or accessories.
B. Flow Switch: Use correct paddle for pipe diameter. Adjust flow switch in accordance with manufacturer's instructions.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 890
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-25
C. Actuators:
1. General:
a. Mount and link control damper actuators according to manufacturer's instructions. b. Check operation of damper/actuator combination to confirm that actuator modulates damper smoothly throughout stroke to both open and closed positions.
2. Actuator Mounting for Damper and Valve Arrangements to Comply with the Following:
a. Damper Actuators: Do not install in the air stream.
b. Use a weather proof enclosure (clear and see through) if actuators are located outside.
c. Damper or valve actuator ambient temperature not-to-exceed 122 degrees F through any combination of medium temperature or surrounding air. Provide appropriate air gaps, thermal isolation washers or spacers, standoff legs, or insulation as necessary. Mount per manufacturer's recommendations. d. Actuator cords or conduit to incorporate a drip leg if condensation is possible. Do not allow water to contact actuator or internal parts. Location of conduits in temperatures dropping below dew point to be avoided to prevent water from condensing in conduit and running into actuator.
e. Damper mounting arrangements to comply with the following:
1) Furnish and install damper channel supports and sheet metal collars. 2) Jack shafting of damper sections not allowed.
3) Multi-section dampers arranged so that each damper section operates individually. Provide one electronic actuator direct shaft mounted per section.
f. Size damper sections based on actuator manufacturers specific recommendations for face velocity, differential pressure and damper type. In general: Damper section not-to-exceed 24 ft-sq. with face velocity 1500 FPM.
g. Multiple section dampers of two or more arranged to allow actuators to be direct shaft mounted on the outside of the duct.
h. Multiple section dampers of three or more sections wide arranged with a 3-sided vertical channel (8-inch wide by 6-inch deep) within the duct or fan housing and between adjacent damper sections. Vertical channel anchored at the top and bottom to the fan housing or building structure for support. Connect sides of each damper frame to the channels. Holes in the channel to allow damper drive blade shafts to pass through channel for direct shaft mounting of actuators. Face open side of channel downstream of the airflow, except for exhaust air dampers. i. Multiple section dampers to be mounted flush within a wall or housing opening to receive either vertical channel supports as described above or sheet metal standout collars. Sheet metal collars (12-inch minimum) to bring each damper section out of the wall to allow direct shaft mounting of the actuator on the side of the collar.
D. Control Valve:
1. Valves installed in accordance with manufacturer's recommendations.
2. Slip-stem control valves installed so that stem position is not more than 60 degrees from vertical up position. Ball type control valves installed with stem in horizontal position.
3. Control valves accessible and serviceable.
4. Install isolation valves so that control valve may be serviced without draining supply/return side piping system. Install unions at connections to screw-type control valves.
5. Valve Sizing for Water Coil:
a. On/Off Control Valves: Line size.
b. Modulating control valve body size may be reduced, at most, two pipe sizes from the line size or not less than 1/2 the pipe size. BAS contractor to size water coil control valves for the application as follows:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 891
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-26
1) Booster-heat valves sized not-to-exceed 4-9 PSI differential pressure. Size valve for 50 percent valve authority. Valve design pressure drop is equal to the sum of coil drop plus the balance valve drop.
2) Primary valves sized not-to-exceed 5-15 PSI differential pressure. Size valve for 50 percent valve authority. Valve design pressure drop is equal to the sum of coil drop plus the balance valve drop.
3) Butterfly valves sized for modulating service at 60 to 70 degree rotation.
Design velocity 12-feet per second or less when used with standard EPDM seats.
c. Valve Mounting Arrangements to Comply with the Following:
1) Provide unions on ports of two-way and three-way valves. 2) Install three-way equal percentage Characterized Control valves in a mixing configuration with the “A” port piped to the coil.
3) Install 2-1/2-inch and above, three-way globe valves, as manufactured for mixing or diverting service to the coil.
E. Control Damper:
1. Dampers installed in accordance with manufacturer's instructions. Unless specifically designed for vertical blade application, dampers must be mounted with blade axis horizontal.
2. After installation of low-leakage dampers with seals, caulk between frame and duct or opening to prevent leakage around perimeter of damper.
F. Air Flow Station: Install where indicated in ductwork and/or equipment with manufacturer's recommended straight ductwork upstream and downstream of air flow station or as shown on drawings, whichever is greater. Where equipment manufacturer's standard airflow measuring station cannot read airflows at required design velocities, provide appropriate air flow measuring station to provide accurate reading throughout system design operations range.
3.8 SMOKE DETECTION (FOR PROJECTS WITH A FIRE ALARM SYSTEM) A. Smoke detector furnished and powered/wired under Division 28, Electronic Safety and Security.
Coordinate with fire alarm equipment supplier. Installation of duct smoke detector housing and sampling tube under Division 23, HVAC.
B. Install smoke detectors in return air systems greater than 2000 CFM.
C. Install smoke detectors at each story prior to connection to return air riser in systems greater than 15,000 CFM and serving more than one story.
3.9 SEQUENCES OF OPERATION AND POINTS LISTS
A. Where local energy code dictates certain sequences (such as night setback, night flush, pressure and temperature reset, terminal unit sequences, etc.), the sequences are not necessarily repeated in the documents. It is not the intent of this specification or documentation to reiterate the energy code. Provide energy code mandated sequences and document in sequence of operations submittals at no additional cost to the Owner. Provide required points to achieve the appropriate sequences.
B. See control diagrams and sequences on drawings.
C. Variable Frequency Drives: For a VFD dependent on an external input for its output setting (e.g., the VFD gets “Frequency” as an input), loss of that external input to result in the VFD holding its last value. If the VFD is running its own PID loop and the external input to the VFD is October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 892
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-27
a setpoint (e.g. duct static pressure setpoint), the VFD to hold the last setpoint. If the VFD loses its process variable (e.g. duct static pressure), the VFD to go to its minimum speed setting.
D. Except as specified otherwise, throttling ranges, proportional bands, and cycle differentials to be centered on the associated setpoint. Modulating feedback control loops to include the capability of having proportional, integral, and derivative action. Unless the loop is specified “proportional only” or “P+I”, Contractor to apply appropriate elements of integral and derivative gain to each control loop to result in stable operation, minimum settling time and maintain the primary variable within the specified maximum allowable variance.
E. Provide a real time clock and schedule controller with sufficient scheduling capability to schedule required controllers and sequences. Schedule functionality may reside in a controller.
If a controller is used, document scheduling functionality including names and types on controller points list submittal. Set up initial schedules in coordination with Owner.
F. Scheduling Terminology: When air handlers are scheduled throughout the day, the following defines the terminology used:
1. Occupied Period: Period of time when the building is in use and occupied. Confirm schedule with Owner. Exclude all national holidays. Generally systems will be fully operational throughout this period and ventilation air to be continuously introduced.
Space temperature setpoints will generally be in the “normal” range of 68 degrees to 78 degrees F.
2. Unoccupied period: Period of time when the building or zone is not in use and unoccupied. Ventilation air not to be introduced.
3. Preoccupancy Period: Time prior to the Occupied period when the systems are returning the space temperatures from setback to “normal” or occupied setpoints (warm-up and cool-down). Ventilation air shall not be introduced unless outside air conditions permit free-cooling or to support a pre-occupancy purge sequence. Time period to be determined by an optimum start strategy unless otherwise specified.
4. Setback Period: Setback will typically start with the end of the occupied period and end with the start of the preoccupancy period, however it shall be provided with its own schedule. Generally systems will be off except to maintain a “setback” temperature, economization may be enabled to maintain “setback” cooling setpoint when applicable.
G. Where any sequence or occupancy schedule calls for more than one motorized unit to start simultaneously, the BAS start commands to be staggered by 5 second (adj.) intervals to minimize inrush current.
H. Wherever a value is indicated as adjustable (adj.), it shall be modifiable, with the proper password level. For these points, it is unacceptable to have to modify programming statements to change the setpoint.
I. When a power failure is detected in any phase, the BAS start commands to be retracted immediately from electrically powered units served by the failed power source. If the associated controller is powered by normal or emergency power, it may monitor its own power source as an indication of power status. If the controller is powered by uninterruptible power supply (UPS), or if it is not capable of monitoring its own power for use in sequences, provide at least one voltage monitor (three phase when applicable) per building. When the BAS detects that normal or emergency power has been restored, all equipment for which the BAS start command had been retracted to be automatically restarted in an orderly manner on staggered 5 second intervals to minimize inrush current.
J. Where reset action is specified in a sequence of operation, but a reset schedule is not indicated on the drawings, employ one of the following methods:
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 893
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-28
1. Determine a fixed reset schedule to result in stable operation and maintain the primary variable within the specified maximum allowable variance.
2. Use a floating reset algorithm which increments the secondary variable setpoint (setpoint of control loop being reset) on a periodic basis to maintain primary variable setpoint. The recalculation time and reset increment to be chosen to maintain the primary variable within the specified maximum allowable variance.
3. Primary variable to control the devices directly using a PID feedback control loop without resetting the secondary variable. However, the control devices to still modulate as necessary to maintain upper and lower limits on the secondary variable. Proportional band, integral gain, and derivative term to be selected to maintain the primary variable within the specified maximum allowable tolerance while minimizing overshoot and settling time. Gain prior approval for implementing this method of reset.
K. Where a supply air temperature or duct pressure setpoint is specified to be reset by the space temperature of the zones calling for the most cooling/heating, employ the following method:
1. Use a floating reset algorithm which increments the secondary variable (e.g., supply air temperature or duct pressure) setpoint on a periodic basis to maintain primary variable (e.g., space temperature) setpoint. The reset increment to be determined by the quantity of “need heat” or “need cool” requests from individual SCU's. A SCU's “need heat” virtual point to activate whenever the zone's space temperature falls below the currently applicable (occupied or unoccupied) heating setpoint throttling range. A SCU's “need cool” virtual point to activate whenever the zone's space temperature rises above the currently applicable (occupied, unoccupied, or economy) cooling setpoint throttling range.
The recalculation time and reset increment to be chosen to maintain the primary variable within the specified maximum allowable variance while minimizing overshoot and settling time. Reset range maximum and minimum values to limit the setpoint range.
L. Where a supply air temperature, duct pressure, or differential water pressure setpoint is specified to be reset by valve or damper position of the zone or zones calling for the most cooling/heating, the following method to be employed:
1. A floating reset algorithm to be used which increments the secondary variable (e.g., supply air temperature, pipe or duct pressure) setpoint on a periodic basis to maintain primary variable (e.g., cooling valve, heating valve, damper position) setpoint of 85 percent open. The reset increment to be calculated based on the average position of the quantity of the worst (most open valve/damper) zone(s) as specified. The recalculation time, reset increment and control device position influence to be chosen to maintain the primal variable within the specified maximum allowable variance while overshoot and settling time. The BAS analog output value to be acceptable as indicating the position of the control device.
2. Alternatively to continuously calculating the average of the quantity of worst valve/damper positions, a method similar to the one described above may be employed whereby the “need heat” or “need cool” virtual point to increment by one unit each time a zone's valve/damper position rises to greater than 95 percent. The quantity of “need heat” or “need cool” points to then be the basis for reset.
M. Where “prove operation” of a device (generally controlled by a digital output) is indicated in the sequence, it shall require that the BAS, after an adjustable time delay after the device is commanded to operate (feedback delay), confirm that the device is operational via the status input. If the status point does not confirm operation after the time delay or anytime thereafter for an adjustable time delay (debounce delay) while the device is commanded to run, an alarm to be enunciated audibly. Upon failure, run command to be removed and the device to be locked out until the alarm is manually acknowledged unless specified otherwise.
N. BAS to provide for adjustable maximum rates of change for increasing and decreasing output from the following analog output points:
1. Speed control of variable speed drives
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 894
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
INSTRUMENTATION AND CONTROL PERFORMANCE
SPECIFICATIONS 23 09 00-29
2. Control Reset Loop
3. Valve Travel Limit
O. Wherever a value is indicated to be dependent on another value (i.e., setpoint plus 5 degrees F) BAS to use that equation to determine the value. Simply providing a virtual point that the operator must set is unacceptable. In this case three virtual points to be provided. One to store the parameter (5 degrees F), one to store the setpoint, and one to store the value which is the result of the equation.
P. Trend points as identified in the points list. Trends to be grouped system specific and setup in two-axis (x,y) graphical format that display object values relative to time. Setup trends to record data in 5 minute increments.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 895
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC PIPING 23 21 13-1
SECTION 23 21 13
HVAC PIPING
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Hydronic Piping, Above Grade
2. Unions
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Welding Certificates: Copies of certificates for welding procedures and personnel.
2. Field Test Reports: Written reports of tests specified in Part 3 of this Section. Include the following:
a. Test procedures used.
b. Test results that comply with requirements.
c. Failed test results and corrective action taken to achieve requirements.
3. Water Analysis: Submit a copy of the water analysis to illustrate water quality available at project site.
4. Grooved couplings, fittings, valves, and specialties: Show grooved joint couplings and fittings on Shop Drawings and product submittals, and specifically identify with the applicable coupling style number.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Installer Qualifications: Company specializing in performing work of the type specified in this Section, with documented experience.
2. Welder Qualifications: Certify in accordance with ASME (BPV IX).
3. ASME Compliance: Comply with ASME B31.9 "Building Services Piping" for materials, products, and installation. Provide safety valves and pressure vessels with the appropriate ASME label. Fabricate and stamp air separators and expansion tanks to comply with the ASME Boiler and Pressure Vessel Code, Section VIII, Division 01.
4. Grooved couplings, fittings, valves, and specialties: Provide all grooved couplings, fittings, valves, and specialty products from a single manufacturer. Utilize only grooving tools from the same manufacturer as the grooved components. Date-stamp all castings October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 896
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC PIPING 23 21 13-2
used for couplings housings, fittings, or valve and specialty bodies for quality assurance and traceability.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 HYDRONIC PIPING, ABOVE GRADE
A. Steel Pipe:
1. Sizes 10-inches and Under: ASTM A 53/A 53M, Schedule 40, black, Type E (electric resistance welded), Grade B.
a. Fittings: ASME B16.3, malleable iron or ASTM A 234/A 234M, wrought steel welding type.
b. Wrought Cast and Forged Steel Flanges and Flanged Fittings: ASME B16.5 including bolts, nuts, and gaskets of the following material group, end connections, and facings:
1) Material Group: 1.1.
2) End Connections: Butt welding.
3) Facings: Raised face.
c. Joints: Threaded or AWS D1.1 welded.
B. Copper Tube: ASTM B 88 (ASTM B 88M), Type L, hard drawn.
1. Fittings: ASME B16.18, cast brass, or ASME B16.22, solder wrought copper.
2. Joints: Solder, lead free ASTM B32, HB alloy (95-5 tin antimony), or tin and silver.
3. Joints: Brazed, AWS A5.8, Classification BAg-36, non-cadmium silver alloy. Pipes 2-1/2- inches or larger or piping routed over food preparation centers, food serving facilities, food storage areas, computer rooms, telecommunications rooms, or electrical rooms.
2.2 UNIONS
A. Unions for Pipe 2-inches and Under:
1. Ferrous Piping: 150, 250, and 300 PSIG malleable iron, threaded, ASME B16.39.
2. Copper Pipe: Bronze, soldered joints, ASME B16.22.
B. Dielectric Connections: Provide dielectric waterway or brass nipple fitting with threaded ends.
Dielectric unions are not allowed.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Install per manufacturer's written instructions and requirements.
B. Install hydronic piping in accordance with the following:
Above Grade Below Grade Preinsulated Pipe Below Grade Uninsulated Piping
Service W/
S
G
C
C
u
St
l
C
u
PE
X
PV
C
HDP
E
Stl Cu PV
C
HDP
E
Heatin
g Hot
Water
X X X N/A N/
A
N/
A
N/A N/A
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 897
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC PIPING 23 21 13-3
1. Key:
a. W/S = Welded/Screwed Steel
b. GC = Grooved Coupling Steel
c. Cu = Copper
d. Stl = Steel
C. Preparation:
1. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe.
2. Remove scale and dirt on inside and outside before assembly.
3. Prepare piping connections to equipment with flanges or unions.
4. Keep open ends of pipe free from scale and dirt. Protect open ends with temporary plugs or caps.
D. Above Grade Piping Installation:
1. Install per manufacturer's written instructions and requirements.
2. Install heating water, glycol, condenser water, piping to ASME B31.9 requirements. Install chilled water piping to ASME B31.5 requirements.
3. Route piping in orderly manner, parallel to building structure, and maintain gradient.
4. Install piping to conserve building space and to avoid interference with use of space.
5. Install groups of pipes parallel to each other, spaced to permit applying insulation and servicing of valves.
6. Sleeve pipe passing through partitions, walls and floors allowing adequate space for pipe insulation.
7. Slope piping at 0.2 percent upward in direction of flow and arrange to drain at low points.
8. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment.
9. Install drains, consisting of a tee fitting, NPS 3/4 ball valve, and short NPS 3/4 threaded nipple with cap, at low points in piping system mains and elsewhere as required for system drainage.
10. Drawings are diagrammatic and do not necessarily show top connections in all cases.
Install branch connections to mains using tee fittings in main, with takeoff coming out of the top unless trade coordination conditions preclude it.
11. Anchor piping for proper direction of expansion and contraction.
12. Inserts:
a. Provide inserts for placement in concrete formwork.
b. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.
c. Provide hooked rod to concrete reinforcement section for inserts carrying pipe over 4-inches.
d. Where concrete slabs form finished ceiling, locate inserts flush with slab surface. e. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut flush with top of slab.
13. Pipe Hangers and Supports:
a. Install in accordance with Section 23 05 29, Hangers and Supports for HVAC Piping, Ductwork and Equipment.
b. Install hangers to provide minimum 1/2-inch space between finished covering and adjacent work.
c. Place hangers within 12-inches of each horizontal elbow. d. Use hangers with 1-1/2-inch minimum vertical adjustment. Design hangers for pipe movement without disengagement of supported pipe.
e. Support vertical piping at top, bottom, and not less than every other floor. Support riser piping independently of connected horizontal piping.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 898
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC PIPING 23 21 13-4
f. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers.
g. Prepare unfinished pipe, fittings, supports, and accessories, ready for finish painting.
h. Provide copper plated hangers and supports for copper piping. i. Prime coat exposed steel hangers and supports. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed.
14. Provide clearance in hangers and from structure and other equipment for installation of insulation and access to valves and fittings.
15. Provide access where valves and fittings are not exposed.
16. Use eccentric reducers to maintain top of pipe level.
17. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welds.
18. Prepare unfinished pipe, fittings, supports, and accessories, ready for finish painting.
E. Field Quality Control:
1. Leave joints, including welds, uninsulated and exposed for examination during test.
2. Provide temporary restraints for expansion joints that cannot sustain reactions due to test pressure. If temporary restraints are impractical, isolate expansion joints from testing.
3. Flush system with clean water. Clean strainers.
4. Isolate equipment from piping. If a valve is used to isolate equipment, provide closure capable of sealing against test pressure without damage to valve. Install blinds in flanged joints to isolate equipment.
5. Install safety valve, set at a pressure no more than one-third higher than test pressure, to protect against damage by expanding liquid or other source of overpressure during test.
6. Perform the following tests on hydronic piping:
a. Use ambient temperature water as a testing medium unless there is risk of damage due to freezing. Another liquid that is safe for workers and compatible with piping may be used.
b. While filling system, use vents installed at high points of system to release trapped air. Use drains installed at low points for complete draining of liquid. c. Check expansion tanks to determine that they are not air bound and that system is full of water.
d. Subject piping system to hydrostatic test pressure that is not less than 1.5 times the design pressure. Test pressure not-to-exceed maximum pressure for any vessel, pump, valve, or other component in system under test. Verify that stress due to pressure at bottom of vertical runs does not exceed either 90 percent of specified minimum yield strength or 1.7 times "SE" value in Appendix A of ASME B31.9, "Building Services Piping."
e. After hydrostatic test pressure has been applied for at least four hours, examine piping, joints and connections for leakage. Eliminate leaks by tightening, repairing, or replacing components, and repeat hydrostatic test until there are no leaks. f. Prepare written report of testing.
F. Flushing and Cleaning of Piping Systems:
1. Clean piping systems thoroughly. Purge pipe of construction debris and contamination before placing the piping systems in service. Provide temporary connections for cleaning, purging, and circulating fluids through the piping system.
2. Use temporary strainers and temporary pumps that can create a minimum fluid velocity of 6-feet per second and maximum of 10-feet per second to flush and clean the piping systems. Do not use Owner's permanent strainers to trap debris during pipe flushing operations. Fit the temporary construction strainers with a line size blowoff valve.
3. When constructing minor piping modifications or additions, verify with Owner if the Owner's pumps and strainers can be used for flushing and chemical cleaning operations.
When the flushing and cleaning operations are complete, ensure the strainer baskets and October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 899
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC PIPING 23 21 13-5
screens installed in the piping systems permanent strainers are replaced with clean elements. Keep temporary strainers in service until the equipment has been tested, then replace straining element with a new strainer and clean and deliver the old straining elements to Owner. Fit the Owner's strainers with a line size blowoff valve.
4. Install bypass piping or hoses at the supply and return piping connections at heat exchangers, chillers, cooling towers, pumps, and cooling coils, etc., to prevent debris from being caught or causing damage to equipment which will be connected to the piping system.
5. Circulate a chemical cleaner in heating water piping systems to remove mill scale, grease, oil, and silt. Cleaner to be selected by chemical treatment vendor on project.
Circulate for 48 hours, flush system and replace with clean water. Dispose of chemical solution in accordance with local codes. The heating water system should then be treated with chemicals and inhibitors to be selected by chemical treatment vendor on project.
When the chemical cleaning is complete, remove, clean, and reinstall all permanent screens. Notify Owner so that the reinstallation of clean strainer screens may be witnessed.
G. Pipe Painting Requirements:
1. Paint all ferrous metal pipe including flanges. Do not paint flange bolts, washers and nuts.
At flexible coupling the only the flanges are to be painted. All rubber portions are to remain unpainted.
2. Paint exterior uninsulated steel piping with exterior latex, semi-gloss (AE), Master Painters Institute MPI 11, suitable for metallic surfaces B, Haze Gray color.
3. Use ready-mixed (including colors) paint. Prime paint with pigment and vehicle, compatible with substrate and finish coats specified. Volatile Organic Compounds (VOC) content of paint materials shall not exceed 50g/l for exterior latex paints and primers.
Lead-based paint is not permitted.
4. Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point.
b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the product manufacturer.
5. Do no exterior painting when it is windy and dusty. Do not paint in direct sunlight or on surfaces that the sun will soon warm.
6. Apply only on clean, dry and frost-free surface. Remove all materials the will affect the ability of the paint to adhere to the pipe including painted pipe identification labels.
7. Remove oil, grease, soil, drawing and cutting compounds, flux and other detrimental foreign. Remove loose mill scale, rust, and paint, by hand or power tool cleaning. All surfaces are to be dry at the time paint is applied.
8. Apply paint in two coats; prime, and finish. Apply each coat evenly and cover substrate completely. Allow not less than 48 hours between application of succeeding coats, except as allowed by manufacturer's printed instructions.
9. Finish surfaces to show solid even color, free from runs, lumps, brushmarks, laps, holidays, or other defects. Apply by brush, roller or spray.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 900
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HYDRONIC PIPING SPECIALTIES 23 21 16-1
SECTION 23 21 16
HYDRONIC PIPING SPECIALTIES
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Instrument Probe Fittings
2. Strainers
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. ASME (BPV VIII, 1) - Boiler and Pressure Vessel Code, Section VIII, Division 01 - Rules for Construction of Pressure Vessels; The American Society of Mechanical Engineers.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Product Data: Provide product data for manufactured products and assemblies required for this project. Include component sizes, rough-in requirements, service sizes, and finishes. Include product description, model and dimensions.
2. Certificates: Inspection certificates for pressure vessels from Authority Having Jurisdiction (AHJ).
3. Manufacturer's Installation Instructions: Indicate hanging and support methods, joining procedures.
4. Project Record Documents: Record actual locations of flow controls. a. Maintenance Data: Include installation instructions, assembly views, lubrication instructions, and replacement parts list.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this Section, with minimum three years of documented experience.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 901
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HYDRONIC PIPING SPECIALTIES 23 21 16-2
1.7 DELIVERY, STORAGE, AND HANDLING
A. Accept valves on site in shipping containers with labeling in place. Inspect for damage.
B. Provide temporary protective coating on cast iron and steel valves.
C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.
D. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the work, and isolating parts of completed system.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Instrument Probe Fittings:
1. Pete's Plug
2. Or approved equivalent.
B. Strainers:
1. Armstrong International
2. Mueller
3. Keckley
4. Hoffman
2.2 INSTRUMENT PROBE FITTINGS
A. Brass or stainless steel body and cap, high pressure rated, valve material neoprene, Nordal or Viton to suit temperature range, 1/4-inch or 1/2-inch NPT tailpiece.
2.3 STRAINERS
A. Size 2-inches and Under: Screwed brass or iron body for 175 PSI working pressure, Y pattern with 1/16-inch stainless steel perforated screen.
B. Basket Pattern: Flanged iron body for 175 PSI working pressure, basket pattern with 1/8-inch stainless steel perforated screen, clamped or bolted cover.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Install specialties in accordance with manufacturer's instructions.
B. Support pump fittings with floor mounted pipe and flange supports. Provide vibration isolation, same as pump, to avoid short circuiting.
3.2 INSTRUMENT PROBE FITTINGS INSTALLATION
A. Test Plugs: Install where indicated and in accordance with the manufacturer's recommendations.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 902
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HYDRONIC PIPING SPECIALTIES 23 21 16-3
3.3 STRAINERS INSTALLATION
A. Provide valved drain and hose connection on strainer blow down connection.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 903
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-1
SECTION 23 31 00
HVAC DUCTS AND CASINGS
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Ductwork, Joints, and Fittings
2. Insulated Flexible Duct
3. Ductwork Joint Sealers and Sealants
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
B. In addition, reference the following:
1. Section 23 05 29, Hangers and Supports for HVAC Piping, Ductwork and Equipment.
2. Section 23 05 93, Testing, Adjusting, and Balancing for HVAC.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Welding Certificates.
2. Field Quality Control Reports.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. NFPA Compliance:
a. NFPA 90A, Installation of Air Conditioning and Ventilating Systems. b. NFPA 90B, Installation of Warm Air Heating and Air Conditioning Systems.
2. Comply with NFPA 96, Ventilation Control and Fire Protection of Commercial Cooking Operations, Ch. 3, Duct System for range hood ducts, unless otherwise indicated.
3. Comply with SMACNA's HVAC Duct Construction Standards - Metal and Flexible for acceptable materials, material thicknesses, and duct construction methods, unless otherwise indicated. Provide sheet metal materials free of pitting, seam marks, roller marks, stains, discolorations, and other imperfections.
4. Provide ductwork pressure testing and leakage testing per Section 23 05 93, Testing, Adjusting, and Balancing for HVAC.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 904
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-2
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 SYSTEM DESCRIPTION
A. Duct system design, as indicated, has been used to select size and type of air-moving and distribution equipment and other air system components. Duct design is generally diagrammatic and is not meant to be scaled. Major changes to layout or configuration of duct system must be specifically approved in writing by Architect. Accompany requests for layout modifications with calculations showing that proposed layout will provide original design results without increasing system total pressure.
PART 2 - PRODUCTS
2.1 DUCTWORK, JOINTS, AND FITTINGS
A. Materials:
1. Galvanized Steel Ducts: Hot-dipped galvanized steel sheet, lock-forming quality, ASTM A 653/A 653M FS Type B, with G90/Z275 coating, minimum 26 gauge except where heavier material is specified. Ducts to have mill phosphatized finish for surfaces exposed to view.
2. Aluminum Ducts: ASTM B 209 (ASTM B 209M); aluminum sheet, alloy 3003-H14.
Aluminum Connectors and Bar Stock: Minimum 24 gauge except where heavier matieral is specified; alloy 6061-T651 or of equivalent strength with mill finish for concealed ducts and standard, 1-side bright finish for exposed ducts with liquid-tight joints when containing condensate vapor or liquids in suspension.
3. Stainless Steel: Fabricated in accordance with ASTM A167 and A480 with liquid-tight joints when containing condensate vapor or liquids in suspension.
B. Fabricate ducts, elbows, transitions, offsets, branch connections, and other construction according to SMACNA's HVAC Duct Construction Standards - Metal and Flexible and complying with requirements for metal thickness, reinforcing types and intervals, tie-rod applications, and joint types and intervals.
1. Lengths: Fabricate rectangular ducts in lengths appropriate to reinforcement and rigidity class required for pressure class.
2. Deflection: Duct systems not-to-exceed deflection limits according to SMACNA's HVAC Duct Construction Standards - Metal and Flexible.
3. Transverse Joints: Prefabricated slide-on joints and components constructed using manufacturer's guidelines for material thickness, reinforcement size and spacing, and joint reinforcement.
C. Formed-On Flanges: construct according to SMACNA's HVAC Duct Construction Standards - Metal and Flexible, Figure 1-4, using corner, bolt, cleat, and gasket details.
1. Duct Size: Maximum 30-inches wide and up to 2-inch wg pressure class.
2. Longitudinal Seams: Pittsburgh lock sealed with noncuring polymer sealant.
3. Cross Breaking or Cross Beading: Cross break or cross bead duct sides 19-inches and larger and 0.0359-inch thick or less, with more than 10 SF of nonbraced panel area unless ducts are lined.
D. Round, Spiral Lock-Seam Ducts: Fabricate supply ducts of material specified in this Section according to SMACNA's HVAC Duct Construction Standards - Metal and Flexible.
1. Ducts up to 20-inches in Diameter: Interior, center-beaded slip coupling, sealed before and after fastening, attached with sheet metal screws.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 905
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-3
2. Ducts 21- to 72-inches in Diameter: Three-piece, gasketed, flanged joint consisting of two internal flanges with sealant and one external closure band with gasket.
3. Ducts Larger than 72-inches in Diameter: Companion angle flanged joints per SMACNA HVAC Duct Construction Standards-Metal and Flexible, Figure 3-2.
4. Round Ducts: Prefabricated connection system consisting of double-lipped, EPDM rubber gasket. Manufacture ducts according to connection system manufacturer's tolerances.
E. 90-Degree Tees and Laterals and Conical Tees: Fabricate to comply with SMACNA's HVAC Duct Construction Standards-Metal and Flexible, with metal thicknesses specified for longitudinal-seam straight ducts.
F. Diverging-Flow Fittings: Fabricate with reduced entrance to branch taps and with no excess material projecting from fitting onto branch tap entrance.
G. Fabricate elbows using die-formed, gored, pleated, or mitered construction. Bend radius of die- formed, gored, and pleated elbows to be 1.5 times duct diameter. Unless elbow construction type is indicated, fabricate elbows as follows:
1. Mitered-Elbow Radius and Number of Pieces: Welded construction complying with SMACNA's HVAC Duct Construction Standards-Metal and flexible, unless otherwise indicated.
2. Round Mitered Elbows: Welded construction with the following metal thickness for pressure classes from minus 2- to plus 2-inch wg (minus 500 to plus 500 Pa):
a. Ducts 3- to 36-inches in Diameter: 0.034-inch.
b. Ducts 37- to 50-inches in Diameter: 0.040-inch.
c. Ducts 52- to 60-inches in Diameter: 0.052-inch.
d. Ducts 62- to 84-inches in Diameter: 0.064-inch.
3. Round Mitered Elbows: Welded construction with the following metal thickness for pressure classes from 2- to 10-inch wg:
a. Ducts 3- to 26-inches in Diameter: 0.034-inch.
b. Ducts 27- to 50-inches in Diameter: 0.040-inch.
c. Ducts 52- to 60-inches in Diameter: 0.052-inch.
d. Ducts 62- to 84-inches in Diameter: 0.064-inch.
4. 90-Degree, Two-Piece, Mitered Elbows: Use only for supply systems or for material- handling Class A or B exhaust systems and only where space restrictions do not permit using radius elbows. Fabricate with single-thickness turning vanes.
5. Round Elbows:
a. 8-inches and Less in Diameter: Fabricate die-formed elbows for 45 and 90-degree elbows and pleated elbows for 30, 45, 60 and 90 degrees only. Fabricate nonstandard bend-angle configurations or non-standard diameter elbows with gored construction.
b. 9 through 14-inches in Diameter: Fabricate gored or pleated elbows for 30, 45, 60 and 90 degrees unless space restrictions require mitered elbows. Fabricate nonstandard bend-angle configurations or nonstandard diameter elbows with gored construction.
c. Larger than 14-inches in Diameter and All Flat-Oval Elbows: Fabricate gored elbows unless space restrictions require mitered elbows.
6. Die-Formed Elbows for Sizes through 8-inches in Diameter and Pressures 0.040-inch thick with two-piece welded construction.
7. Round Gored-Elbow Metal Thickness: Same as non-elbow fittings specified above.
8. Pleated Elbows for Sizes through 14-inches in Diameter and Pressures through 10-inch wg (2500 Pa): 0.022-inch.
9. Not acceptable:
a. Corrugated or flexible metal duct.
b. Adjustable elbows.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 906
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-4
2.2 INSULATED FLEXIBLE DUCT
A. Manufacturers:
1. ATCO
2. Flexmaster
3. J.P. Lamborn Co.
4. Hart and Cooley
B. Construction: Standard factory fabricated product. Inner wall: Impervious vinyl or chlorinated polyethylene, permanently bonded to a vinyl or zinc-coated spring steel helix.
C. Insulation: Fiberglass blanket insulation covered by an outer wall of vinyl or fiberglass-reinforced metalized vapor barrier.
D. Listing: UL 181 listed Class 1 flexible air duct material. Overall thermal transmission: No more than 0.25 BTU/in or hr/sq. degrees F at 75 degrees F differential, per ASTM C335.
E. Vapor transmission value no more than 0.10 perm, per ASTM E96.
F. Pressure Rating: 4-inch wg positive pressure and 1-inch wg negative pressure.
G. Performance Air Friction Correction Factor: 1.3 maximum at 95 percent extension. Working air velocity: Minimum 2000 FPM.
H. Flame Spread Rating: No more than 25.
I. Smoke Development Rating: No more than 50 as tested per ASTM E84.
J. Insertion Loss: Minimum attenuation of 29 DB for 10-foot straight length at 8-inch diameter at 500 Hz.
2.3 DUCTWORK JOINT SEALERS AND SEALANTS
A. Manufacturers:
1. Ductmate
2. Duro Dyne
3. Hardcast
4. United McGill Corporation
5. Vulkem
6. Foster
7. Childer
8. Design Polymetrics (DP)
B. Joint Sealers and Sealants: Non-hardening, water resistant, mildew and mold resistant.
C. Low Emitting Materials Requirement: Adhesives, sealants and sealant primers must comply with South Coast Air Quality Management District (SCAQMD) Rule #1168.
D. Type: Heavy mastic or liquid, suitable for joint configuration and compatible with substrates, and recommended by manufacturer for pressure and leakage class of ducts.
E. Surface Burning Characteristics: Flame spread of zero, smoke developed of zero, when tested in accordance with ASTM E 84.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 907
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-5
F. Water Based Sealant for Brush-On Application: Flexible, adhesive sealant, resistant to UV light, UL-181A, and UL-181-B listed, complying with NFPA requirements for Class 1 ducts. Min. 69 percent solids, nonflammable. Hardcast Versa-Grip 181; Childers CP-146; Foster 32-19 for SMACNA 1/2, 1, 2, 3, 4, 6, and 10-inch WG duct classes, and SMACNA Seal Class A, B, or C.
G. Flanged Joint Mastic: One-part, acid-curing, silicone, elastomeric joint sealant complying with ASTM C920, Type S, Grade NS, Class 25, Use O.
H. Flange Gaskets: Butyl rubber or EPDM polymer with polyisobutylene plasticizer.
I. Polyurethane Sealant: General-purpose, exterior use, non-brittle sealant for gunned application.
Vulkem 616 or equal.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. General: Use the following pressure seal, and leakage class(es) in design of ductwork specified in this section unless otherwise noted on Drawings.
SYSTEM PRESSURE CLASS
(Inches of Water)
SEAL
CLASS
LEAKAGE
CLASS
ROUND
DUCTS
LEAKAGE
CLASS
RECTANGULAR
DUCTS
Medium
Pressure
Supply (fan to
terminal unit)
0.5-inch higher than air
handlers discharge
pressure (min 4-inch
pressure class).
A 2 4
Low Pressure
(downstream
of terminal
unit)
+ 1-inch A 2 4
Return and
Exhaust
0.5-inch more negative
than return/exhaust fan
pressure or -2-inch
pressure class,
whichever is more
negative.
A 2 4
B. Ductwork Installation:
1. General: Install entire duct system in accordance with drawings, Specifications, and latest issues of local Mechanical Code, NFPA 90A, and SMACNA Duct Construction Manual. At Contractor's option, rectangular ductwork may be resized to maintain an equivalent air velocity and friction rate, while maintaining a maximum aspect ratio of 3. Remove markings and tagging from ductwork exterior surface in mechanical rooms and other locations where ductwork is exposed.
2. The duct layout shown on the Contract Drawings is diagrammatic in nature. Coordinate the ductwork routing and layout, and make alterations to the ductwork routing and layout to eliminate physical interferences. Where deviations in the ductwork routing as shown in the Contract Drawings are required, alterations may be made so as not to compromise the air flow, pressure drop, and sound characteristics of the duct fitting or duct run as shown on the Contract Drawings. In the event Architect determines that the installed ductwork is inconsistent with the above mentioned criteria, remove and replace at no additional cost to the Owner.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 908
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-6
3. Install ducts with fewest possible joints.
4. Install fabricated fittings for changes in directions, size, shape, and for connections.
5. Install couplings tight to duct wall surface with a minimum of projections into duct. Secure couplings with sheet metal screws. Install screws at intervals of 12-inches, with a minimum of 3 screws in each coupling.
6. Install ducts, unless otherwise indicated, vertically and horizontally and parallel and perpendicular to building lines; avoid diagonal runs.
7. Install ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building.
8. Install ducts with a clearance of 1-inch, plus allowance for insulation thickness. Allow for easy removal of ceiling tile.
9. Conceal ducts from view in finished spaces. Do not encase horizontal runs in solid partitions unless specifically indicated.
10. Coordinate layout with suspended ceiling, air duct accessories, lighting layouts, and similar finish work.
11. Electrical and IT Equipment Spaces: Route ducts to avoid passing through transformer vaults, electrical equipment spaces, IDF/MPOE rooms, and enclosures.
12. Non-Fire-Rated Partition Penetrations: Where ducts pass through interior partitions and exterior walls and are exposed to view, conceal spaces between construction openings and ducts or duct insulation with sheet metal flanges of same metal thickness as ducts.
Overlap openings on 4 sides by at least 1-1/2-inches.
13. Fire- and Smoke-Rated Partition Penetrations: Where ducts pass through interior partitions and exterior walls, install appropriately rated fire, smoke or combination fire and smoke dampers as governed by Building Code and AHJ, including sleeves, and firestopping sealant.
14. Install ducts with hangers and braces designed to withstand, without damage to equipment, seismic force required by applicable building codes. Reference Mason Seismic Restraint and Support Systems.
15. Protect duct interiors from the elements and foreign materials until building is enclosed.
Follow SMACNA's Duct Cleanliness for New Construction Advanced Level.
16. Paint interiors of metal ducts, that do not have duct liner, for 24-inches upstream of registers and grilles. Apply one coat of flat, black, latex finish coat over a compatible duct material.
17. Install ductwork in the location and manner shown and detailed. Review deviations required by job conditions with Architect prior to any fabrication. Provide fittings for construction per SMACNA.
18. Install flexible ductwork to limit sag between support hangers to 1/2-inch per foot of spacing support.
C. Flanged Take-Offs:
1. Install at branch takeoffs to outlets using round or flex duct.
2. Flanged take-offs secured with minimum 8-inch screw spacing (three screws minimum).
3. Provide ductwork taps and branches off of main ducts at 45 degrees whether shown on Drawings or not (drawings are diagrammatic).
D. Cleaning:
1. Clean duct systems with high power vacuum machines. Protect equipment that could be harmed by excessive dirt with filters, or bypass during cleaning. Provide adequate access into ductwork for cleaning purposes.
2. Grille and Exposed Duct Cleaning:
a. After completion of ductwork installation, operate each fan system (excluding exhaust fans) for a minimum of 30 minutes prior to installation of ceiling grilles and diffusers. After grilles and diffusers are installed, clean out accumulation of particles from grilles and diffusers prior to acceptance.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 909
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-7
b. Clean exterior surface of ducts exposed to public view of chalk, pencil and pen marks, labels, sizing tags, dirt, dust, etc., so that upon completion of installation, ducts are left in clean and unblemished manufactured conditions. c. Exposed duct and grilles to remain free of dust entrained streaks due to leakage at joints and grille connections during warranty period. Clean leaks, seal and refinish to match existing if visible streaks develop.
3.2 DUCTWORK, JOINTS, AND FITTINGS INSTALLATION
A. Duct Materials - Applied Locations:
1. General: Use the following materials in design of ductwork specified in this Section unless otherwise noted on the Drawings.
Location or Application Material
Supply, Return, Transfer, and Exhaust - Low
Pressure (downstream of terminal units)
Single Wall, Galvanized
Steel
Supply, Return, and Exhaust - Medium Pressure
(upstream of terminal units)
Single Wall, Galvanized
Steel
B. Ductwork Installation:
1. Fabricate radius elbows with centerline radius not less than 1-1/2 duct diameters.
2. Do not install duct size transition pitch angles which exceed 30 degrees for reductions in duct size in the direction of airflow, and 15 degrees for expansions in duct size in the direction of airflow.
3. Install fixed turning vanes in square throat rectangular elbows and in tees.
4. Fabricate duct turns with the inside (smallest) radius at least equal to the duct width (supply ducts) and 1.5 times radius (return and exhaust ducts). Where necessary, square elbows may be used, with maximum available inside radius and with fixed turning vanes.
In healthcare settings such as hospitals and medical office buildings, square elbows and turning vanes allowed on supply ductwork only.
3.3 INSULATED FLEXIBLE DUCT INSTALLATION
A. Provide sheet metal plenum or rigid elbow and connect to diffusers and grilles with ductwork connections. Refer to Drawings for more information. Provide straight section of flexible duct with minimum length of 2-feet and maximum length of 5-feet and connect to sheet metal plenums and rigid elbows connected to diffusers and grilles, unless noted otherwise.
1. Provide round neck grilles/diffusers or square-to-round transitions. Flexible duct connections directly to diffuser and grilles is not allowed.
2. Flexible duct allowed in concealed spaces above lay-in ceilings only.
3.4 DUCTWORK JOINT SEALERS AND SEALANTS INSTALLATION
A. Joints and Seam Joint Sealing:
1. Seal duct seams and joints according to SMACNA's HVAC Duct Construction Standards - Metal and Flexible, for duct pressure class indicated.
2. Seal transverse joints, longitudinal seams and duct wall penetrations including screw, fastener, pipe, rod, and wire.
3. Seal ducts before external insulation is applied.
4. Tape joints of PVC coated metal ductwork with PVC tape.
5. Fasteners such as sheet-metal screws, machine screws or rivets to be cadmium plated.
6. Rectangular Ductwork: Where intermediate joint reinforcement is required for duct of negative pressure class, pre-drill stiffening flange and provide fastener maximum 8-inches on center. Where retaining flanges are welded to duct wall, paint welds with zinc coating.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 910
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC DUCTS AND CASINGS 23 31 00-8
7. Single Wall Round Ductwork: Joint to incorporate beaded slip collar with minimum #8 sheet metal screws 8-inches on center. Seal ductwork as specified in this Section.
8. Seal joints and seams. Apply sealant to make end connectors before insertion, and afterward to cover entire joint and sheet metal screws.
9. Double Wall Round Ductwork: Joint to incorporate beaded slip collar or flanged connection, with minimum #8 sheet metal screws 8-inches on center. Seal ductwork as specified in this Section.
10. Duct sizes indicated are inside clear dimensions. For lined ducts, maintain sizes inside lining.
11. Provide openings in ductwork where required to accommodate thermometers and control devices. Provide pitot tube openings where required for testing of systems, complete with metal can with spring device or screw to ensure against air leakage. Where openings are provided in insulated ductwork, install insulation material inside a metal ring.
12. Locate ducts with sufficient space around equipment to allow normal operating and maintenance activities as well as Code required clearances.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 911
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-1
SECTION 23 33 00
AIR DUCT ACCESSORIES
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Sheet Metal Materials
2. Backdraft Dampers
3. Dampers
4. Concealed Damper Hardware
5. Access Doors
6. Duct Test Holes
7. Turning Vanes
8. Flexible Connectors
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Manufacturer's catalog data and fabrication/installation drawings for each factory fabricated duct accessory. Include leakage, pressure drop and maximum back pressure data.
2. Shop Drawings: Indicate air duct accessories.
3. Manufacturer's installation instructions: Provide instructions for each factory fabricated duct accessory.
4. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. a. See Division 01, General Requirements, Product Requirements for additional provisions.
b. Extra Fusible Links: One of each type and size.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this Section, with minimum five years of documented experience.
2. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. as suitable for the purpose specified and indicated.
3. AMCA 500 - Test Methods for Louvers, Dampers and Shutters.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 912
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-2
4. AMCA 511 - Certified Ratings Program for Air Control Devices.
5. AMCA 611, latest edition - Certified Ratings Program - Product Rating Manual for Airflow Measurement Stations.
6. AMCA 610, latest edition - Laboratory Methods of Testing Airflow Measurement Stations for Performance Rating.
7. NFPA 90A - Installation of Air Conditioning and Ventilating Systems.
8. NFPA 92A - Smoke-Control Systems.
9. NFPA 92B - Smoke Control Systems in Atria, Covered Malls and Large Areas.
10. NFPA 101 - Life Safety Code.
11. UL 555 - Standard for Safety; Fire Dampers.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 SHEET METAL MATERIALS
A. Comply with SMACNA's "HVAC Duct Construction Standards--Metal and Flexible" for acceptable materials, material thicknesses, and duct construction methods, unless otherwise indicated.
B. Galvanized Sheet Steel: Lock-forming quality; complying with ASTM A 653/A 653M.
Galvanizing: 1-1/4 ounces per square foot total both sides; ducts to have mill-phosphatized finish for surfaces exposed to view.
C. Stainless Steel: ASTM A 480/A 480M.
D. Reinforcement Shapes and Plates: Galvanized-steel reinforcement where installed on galvanized sheet metal ducts; compatible materials for aluminum and stainless-steel ducts.
E. Tie Rods: Galvanized steel, 1/4-inch minimum diameter for lengths 36-inches or less; 3/8-inch minimum diameter for lengths longer than 36-inches.
2.2 BACKDRAFT DAMPERS
A. Manufacturers:
1. Air Balance
2. Cesco
3. Greenheck
4. Nailor
5. Ruskin
B. Basis-of-Design: Ruskin CB D6.
C. Description: Multiple-blade gravity balanced with center pivoted blades with sealed edges, assembled in rattle free manner with 90-degree stop, adjustment device to permit setting for varying differential static pressure.
D. Frame: 0.125-inch thick 6063-T5 extruded aluminum channel with galvanized steel braces at mitered corners. Provide mounting flange.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 913
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-3
E. Blades: Single piece, overlap frame, parallel action, horizontal orientation, minimum 0.07-inch 6063-T5 extruded aluminum material, maximum 6-inch width.
F. Bearings: Corrosion-resistant synthetic, formed as single piece with axles.
G. Blade Seals: Extruded vinyl, mechanically attached to blade edge.
H. Blade Axles: Corrosion-resistant, synthetic formed as single piece with bearings, locked to blade.
I. Tie Bars and Brackets: Galvanized steel.
J. Return Spring: Adjustable tension.
K. Damper Capacity:
1. Closed Position: Maximum back pressure of 16-inches water gauge.
2. Open Position: Maximum air velocity of 2,500-feet per minute.
L. Counterbalances: Adjustable zinc plated steel weights mechanically attached to blade. Must be capable of operating over wide range of pressures.
M. Finish: Mill aluminum.
N. Temperature Rating: -40 degrees F to 200 degrees F.
O. Operation of Blade:
1. Start to Open: 0.01-inch wg
2. Fully Open: 0.05-inch.
P. Pressure Drop: Maximum 0.15-inch wg at 1,500-feet per minute through 24-inch by 24-inch damper.
Q. Factory Sleeve: Minimum 20 gauge thickness, 12-inches in length.
R. Screen: At outdoor intake or discharge. 1/4-inch aluminum.
2.3 DAMPERS
A. Manufacturers:
1. Air Balance
2. Cesco
3. Greenheck
4. Nailor
5. Ruskin
B. Basis-of-Design:
1. Rectangular ductwork for velocities and pressures up to 1,500 fpm and 2.5-inch wg, respectively: Ruskin MD-35.
2. Rectangular ductwork for velocities and pressures up to 3,000 fpm and 4-inch wg, respectively: Ruskin CD-60.
3. Round ductwork for velocities and pressures up to 3,000 fpm and 4-inch wg, respectively:
Ruskin CDSR-15.
C. General Description: Factory fabricated, with required hardware and accessories. Stiffen damper blades for stability. Include locking device to hold single-blade dampers in a fixed October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 914
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-4
position without vibration. Close duct penetrations for damper components to seal duct consistent with pressure class.
1. Pressure Classes of 3-Inch wg (750 Pa) or Higher: End bearings or other seals for ducts with axles full length of damper blades and bearings at both ends of operating shaft.
D. Rectangular Volume Dampers: Multiple- or single-blade, parallel- or opposed-blade design with linkage concealed in frame and suitable for horizontal or vertical applications.
1. Steel Frames: Hat-shaped, galvanized sheet steel channels, minimum 16 gauge thick, with mitered and welded corners; frames with flanges where indicated for attaching to walls and flangeless frames where indicated for installing in ducts. a. Roll-Formed Steel Blades: Galvanized sheet steel, 16 gauge thick for velocities up to 1,500 fpm, and 14 gauge thick for velocities up to 3,000 fpm. b. Blade Axles: Minimum 1/2-inch diameter, plated steel, hex shaped, mechanically attached to blade.
c. Bearings: Molded synthetic sleeve, turning in extruded hole in frame. d. Tie Bars and Brackets: Galvanized steel.
e. Mill galvanized.
E. Round Volume Dampers: Single-blade suitable for horizontal or vertical applications.
1. Steel Frames: Galvanized, roll formed, minimum of 20 gauge thick with beads at each end.
2. Blades: Minimum 14 gauge thick, galvanized sheet steel, round, single-piece.
3. Blade Axles: Minimum 1/2-inch square, plated steel, mechanically attached to blade.
4. Bearings: Molded synthetic sleeve, turning in hole in frame.
5. Finish: Mill galvanized.
6. Capacity:
a. Closed Position: Maximum pressure of 4-inches wg.
b. Open Position: Maximum air velocity of 3,000-feet per minute.
7. Leakage: Maximum 20 cfm at 4-inches wg.
8. Pressure Drop: Maximum 0.02-inch wg at 1,500-feet per minute through 20-inch diameter dampers.
F. Jackshaft: 1-inch diameter, galvanized-steel pipe rotating within pipe-bearing assembly mounted on supports at each mullion and at each end of multiple-damper assemblies.
1. Length and Number of Mountings: Appropriate to connect linkage of each damper in multiple-damper assembly.
2. Damper Hardware: Zinc-plated, die-cast core with dial and handle made of 3/32-inch thick zinc-plated steel, and a 3/4-inch hexagon locking nut. Include center hole to suit damper operating-rod size. Include 2-inch elevated platform for insulated duct mounting.
2.4 CONCEALED DAMPER HARDWARE
A. Manufacturers:
1. Young Regulator Company
B. Concealed Damper Hardware: For dampers above non-removable ceilings (gyp, plaster, decorative, etc.) where access panels have not been shown on Architectural drawings or in locations where dampers are more than 2-feet above the ceiling, provide:
1. Concealed Damper Regulator: Young Regulator Company Model 315 or approved equivalent.
2. Cable System: Young Regulator Company or approved equivalent.
3. Controller: Young Regulator Company 270-275 or approved equivalent.
4. Control wrenches, wire stops, casing nuts, and stainless steel wire.
5. Paint cover plate to match ceiling color or as directed by Architect.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 915
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-5
2.5 ACCESS DOORS
A. Manufacturers:
1. Ductmate
2. Cesco
3. Ruskin
4. Nailor
5. Outdoor Installation: Karp MX insulated exterior access door.
B. Duct Pressure Class 2-inch WC and Greater: Sandwich-type design with threaded locking bolt assembly. Closed cell neoprene gasket permanently bonded to inside panel. Zinc-coated steel wing nuts or polypropylene molded knobs with threaded metal inserts - zinc coated bolts sealed to inner panel.
C. Duct Pressure Class 1-1/2-inch WC and Less: Galvanized steel assembly incorporating frame, door, hinges, and latch(es). Frame tabbed for attachment to duct panel. Double wall door panel with 1-inch insulation. Open cell neoprene gasket attached to frame. Cam latches for tight closure.
D. Plenum Doors: Extruded aluminum frames with extruded santoprene seals. Double-wall 20 gauge galvanized steel door panel with fiberglass insulation.
E. Size: Maximum size available to fit rectangular duct panel dimension or round duct diameter.
Plenum doors minimum 2-feet wide by 4-feet high.
F. For outdoor installation, only provide waterproof access doors installed vertically.
2.6 DUCT TEST HOLES
A. Manufacturers:
1. Ventlok
B. Temporary Test Holes: Cast iron or cast aluminum to suit duct material, including screw cap and gasket. Size to allow insertion of pitot tube and other testing instruments and of length to suit duct insulation thickness.
C. Permanent Test Holes (where shown on Drawings): Factory fabricated, air tight flanged fittings with screw cap. Provide extended neck fittings to clear insulation.
2.7 TURNING VANES
A. Manufacturers:
1. Aerodyne
2. Ductmate Industries
3. Duro Dyno Corp.
4. Metalaire Inc.
B. Fabricate to comply with SMACNA's "HVAC Duct Construction Standards--Metal and Flexible" for vanes and vane runners. Vane runners to automatically align vanes.
C. Manufactured Turning Vanes: For medium pressure ductwork, ductwork upstream of terminal units, and in ductwork with equal inlet width and height dimensions and outlet width and height dimension, provide double thickness airfoil turning vanes. Low pressure ductwork and ductwork downstream of terminal units use either single thickness or double thickness turning vanes. For mitered rectangular elbows with changes in size from inlet to outlet, only use single thickness October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 916
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-6
turning vanes. Use 2-inch radius vanes spaced on centers of 1.5-inches for single thickness.
Use 2-inch radius vanes spaced on centers of 2.125-inches for double thickness.
D. Acoustic Turning Vanes: Fabricate airfoil-shaped aluminum extrusions with perforated faces and fibrous-glass fill.
2.8 FLEXIBLE CONNECTORS
A. Manufacturers:
1. Duro Dyne Corp.
2. Ventfabrics Inc.
3. Ductmate Industries
4. Hardcast
B. General Description: Flame-retardant or noncombustible fabrics, coatings, and adhesives complying with UL 181, Class 1.
C. Metal-Edged Connectors: Factory fabricated with a fabric strip 4-inches wide attached to two strips of 2-3/4-inch wide, 0.028-inch thick, galvanized sheet steel or 0.032-inch thick aluminum sheets. Select metal compatible with ducts.
D. Provide a spring and bracket assembly to reinforce the fabric with sufficient tension to prevent connector collapse under negative or positive pressure. Number and positioning of spring-link fixture to be determined by the manufacturer to maintain straight axis and without kinks between two sections of duct, or between duct and the moving element. Hardcast Spring-Link SL-200, or equal.
E. Indoor System, Flexible Connector Fabric (FC-I): Glass fabric double coated with neoprene.
1. Minimum Weight: 30 ounces per square yard.
2. Tensile Strength: 395 pounds of force per inch in the warp and 255 pounds of force per inch in the filling.
3. Service Temperature: -40 degrees F to 200 degrees F.
F. Outdoor System, Flexible Connector Fabric (FC-O): Glass fabric double coated with Hypalon, resistant to UV rays and ozone.
1. Minimum Weight: 26 ounces per square yard.
2. Tensile Strength: 225 pounds of force per inch in the warp and 300 pounds of force per inch in the filling.
3. Service Temperature: -40 degrees F to 200 degrees F.
G. High-Temperature System, Flexible Connectors (FC-HT): Glass fabric coated with silicone rubber.
1. Minimum Weight: 30 ounces per square yard.
2. Tensile Strength: 372 pounds of force per inch in the warp and 372pounds of force per inch in the filling.
3. Service Temperature: -70 degrees F to 500 degrees F.
H. High-Corrosive-Environment System, Flexible Connectors (FC-HC): Glass fabric with chemical- resistant coating.
1. Minimum Weight: 14 ounces per square yard.
2. Tensile Strength: 450 pounds of force per inch in the warp and 340 pounds of force per inch in the filling.
3. Service Temperature: -67 degrees F to 500 degrees F.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 917
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-7
PART 3 - EXECUTION
3.1 DUCT ACCESSORIES GENERAL INSTALLATION
A. Inspect areas to receive air duct accessories. Notify Engineer of conditions that would adversely affect the installation of the dampers. Do not proceed until conditions are corrected.
B. Install duct accessories according to applicable details in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for metal ducts.
C. Provide duct accessories of materials suited to duct materials; use galvanized-steel accessories in galvanized-steel, stainless-steel accessories in stainless-steel ducts, and aluminum accessories in aluminum ducts.
D. Do not compress or stretch damper frames into duct or opening.
E. Handle dampers using sleeve or frame. Do not lift dampers using blades, actuators, or jack shafts.
F. Adjust duct accessories for proper settings.
3.2 SHEET METAL MATERIALS INSTALLATION
A. Install bracing for multiple sections to support assembly weights and hold against system pressure. Install bracing as needed.
3.3 BACKDRAFT DAMPERS INSTALLATION
A. Install backdraft dampers on exhaust fans or exhaust ducts nearest to outside and where indicated. Provide at outside air intakes where motorized dampers are not shown on drawings.
3.4 DAMPERS INSTALLATION
A. Where installing volume dampers in ducts with liner, avoid damage to and erosion of duct liner.
B. Provide balancing dampers at points on supply, return, and exhaust systems where branches lead from larger ducts for air balancing. Install at a minimum of two duct widths from each branch takeoff. Provide balancing dampers for all air inlets and outlets.
C. Install dampers square and free from racking with blade running horizontally.
3.5 CONCEALED DAMPER HARDWARE INSTALLATION
A. Coordinate location in Reflected Ceiling Plan and color of concealed damper hardware with Architect prior to installation.
3.6 ACCESS DOORS INSTALLATION
A. Install duct access doors to allow for inspecting, adjusting, and maintaining accessories and terminal units as follows:
1. On both sides of duct coils.
2. Downstream from volume dampers, turning vanes and equipment.
3. Adjacent to fire or smoke dampers, providing access to reset or reinstall fusible links.
4. To interior of ducts for cleaning; before and after each change in direction, at maximum 50-foot (15-m) spacing.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 918
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR DUCT ACCESSORIES 23 33 00-8
5. Install the following sizes for duct-mounting, rectangular access doors:
a. One-Hand or Inspection Access: 8-inches by 5-inches. b. Two-Hand Access: 12-inches by 6-inches.
c. Head and Hand Access: 18-inches by 10-inches.
d. Head and Shoulders Access: 21-inches by 14-inches.
e. Body Access: 25-inches by 14-inches.
f. Body Plus Ladder Access: 25-inches by 17-inches.
6. Install the following sizes for duct-mounting, round access doors:
a. One-Hand or Inspection Access: 8-inches in diameter. b. Two-Hand Access: 10-inches in diameter.
c. Head and Hand Access: 12-inches in diameter.
d. Head and Shoulders Access: 18-inches in diameter.
e. Body Access: 24-inches in diameter.
7. Label access doors.
3.7 DUCT TEST HOLES INSTALLATION
A. Provide test holes at fan inlets and outlets where indicated and where required for air testing and balancing.
3.8 TURNING VANES INSTALLATION
A. Vanes must be installed, eliminating every other vane is not allowed.
B. Single thickness vanes cannot be over 36-inches long without intermediate vane runner.
C. Install per SMACNA and fasten/support to prevent vibration, noise, and to maintain proper alignment at design velocity.
3.9 FLEXIBLE CONNECTORS INSTALLATION
A. Install flexible connectors immediately adjacent to equipment in ducts associated with fans and motorized equipment supported by vibration isolators. Provide sheet metal weather cover over flexible connections located outdoors. Attach sheet metal to either equipment side or ductwork side, but not both.
B. Per NFPA, do not use flexible connectors on grease exhaust fans.
C. Securely attach spring-lock brackets to the metal strips of the connector collar using No. 8 sheet metal screws.
D. For fans developing static pressures of 5-inch wg and higher, cover flexible connectors with loaded vinyl sheet held in place with metal straps.
E. Adjust the following types in the following locations:
1. FC-I: Indoors.
2. FC-O: Outdoors.
3. FC-HT: High temperature exhaust systems and smoke removal systems.
4. FC-HC: High corrosive systems inclusive of all laboratory exhaust systems.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 919
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC FANS 23 34 00-1
SECTION 23 34 00
HVAC FANS
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Centrifugal Fans
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Certified fan performance curves with system operating conditions indicated.
2. Certified fan sound-power ratings.
3. Motor ratings and electrical characteristics, plus motor and electrical accessories.
4. Material gauges and finishes, including color charts.
5. Dampers, including housings, linkages, and operators.
6. For belt-driven fans, indicate the number of belts provided for design duty.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Motors: Premium efficiency. Electrically Commutated Motors (ECM) where scheduled on Drawings.
2. Sound power levels as scheduled on Drawings. If not scheduled, within 5 percent of Basis of Design at design flow.
3. Project Altitude: Base air ratings on sea-level conditions for project sites below 2,000 feet in elevation. Base air ratings on actual site elevations for project sites above 2,000 feet in elevation.
4. Operating Limits: Classify according to AMCA 99.
5. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
6. AMCA Compliance: Products are to comply with performance requirements and are to be licensed to use the AMCA-Certified Ratings Seal.
7. NEMA Compliance: Motors and electrical accessories are to comply with NEMA standards.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 920
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC FANS 23 34 00-2
8. UL Standard: HVAC Fans are to comply with UL 705. Fans used in grease exhaust applications are to be UL 705 - Supplement SC listed for grease exhaust. Fans used for smoke control applications are to be UL 705 - Supplement SD listed for Power Ventilators for Smoke Control.
9. Belt-driven fans used for smoke control applications are to have 1.5 times the number of belts required for the design duty, with the minimum number of belts being two.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver fans as factory-assembled unit, to the extent allowable by shipping limitations, with protective crating and covering.
B. Disassemble and reassemble units, as required for moving to final location, according to manufacturer's written instructions.
C. Lift and support units with manufacturer's designated lifting or supporting points.
1.8 COORDINATION
A. Coordinate size and location of structural-steel support members.
B. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.
C. Coordinate installation of roof curbs, equipment supports, and roof penetrations.
1.9 EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. Belts: One set for each belt-driven unit.
PART 2 - PRODUCTS
2.1 CENTRIFUGAL FANS
A. Manufacturers:
1. Greenheck
2. Cook
3. Twin City
B. Description: Centrifugal or utility type centrifugal fans, as indicated, standard factory finish, AMCA rated, single width, single inlet, double width, double inlet, forward curved, backward inclined, or airfoil blades as scheduled.
C. Wheel and Inlet:
1. Backward Inclined: Steel or aluminum construction with smooth curved inlet flange, heavy back plate, backwardly curved blades welded or riveted to flange and back plate; cast iron or cast steel hub riveted to back plate and keyed to shaft with set screws.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 921
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC FANS 23 34 00-3
2. Airfoil Wheel: Steel construction with smooth curved inlet flange, heavy back plate die formed hollow airfoil shaped blades continuously welded at tip flange, and back plate; cast iron or cast steel hub riveted to back plate and keyed to shaft with set screws.
3. Statically and dynamically balance wheel within its own bearings with maximum balance quality grade at bearings of G16 (0.20 in/sec peak velocity, filter-in as measured at fan RPM) for 5 hp and below and G6.3 (0.15 in/sec peak velocity, filter-in as measured at fan RPM) for 7.5 hp and above per ANSI S2.19. AMCA 210 rated.
D. Housing:
1. Heavy gauge steel, spot welded for AMCA 99 Class I and II fans, and continuously welded for Class III, adequately braced, designed to minimize turbulence with spun inlet bell and shaped cut.
2. Finish: Factory finish to manufacturer's standard (Permatector). Prime coating of aluminum parts is not allowed.
3. Removable angles and bolts for attaching flexible connections and discharge dampers on fan outlet.
4. Housing Discharge Arrangement: Adjustable to eight standard positions.
E. Bearings and Drives:
1. Bearings: Heavy duty pillow block type, self-greasing ball bearings, with ABMA 9 L-10 life at 100,000 hours.
2. Shafts: Hot rolled steel, ground and polished, with keyway, protectively coated with lubricating oil, and shaft guard. Provide anti-corrosive coating.
3. Drive: Cast iron or steel sheaves, dynamically balanced, keyed. Variable and adjustable pitch sheaves for motors 5 hp and under, selected so required rpm is obtained with sheaves set at mid-position fixed sheave for 7.5 hp and over, matched belts, and drive rated as recommended by manufacturer or minimum 1.5 times nameplate rating of motor.
4. Belts: Oil resistant, nonsparking, and nonstatic; matched sets for multiple belt drives.
5. Belt Guard: Fabricate to SMACNA Duct Construction Standards - Metal and Flexible;
0.106-inch thick, 3/4-inch diamond mesh wire screen welded to steel angle frame or equivalent, prime coated. Secure to fan or fan supports without short circuiting vibration isolation, with provision for adjustment of belt tension, lubrication, and use of tachometer with guard in place.
F. Motor: Integrally mounted, 1800 RPM maximum, with pre-lubricated sealed ball bearings. ODP for motors located indoors and TEFC for motors exposed to moisture.
G. Accessories:
1. Inlet/Outlet Screens: Galvanized steel welded grid, removable, at unit outlet for outdoor installation, and unit inlet for unducted conditions.
2. Access Doors: Shaped to conform to scroll, with quick opening latch type handles and gaskets.
3. Scroll Drain: 1/2-inch steel pipe coupling welded to low point of fan scroll for outdoor installation.
4. AMCA 99 Type B spark proof construction where scheduled.
5. Protective coating on fan wheel and interior of fan housing where scheduled. Apply coating before balancing fans and repair any breaks in coating which occur during balancing. One 6-mil coat of white plastic #7122 and one 6-mil coat of black plastic #7122.
6. Vibration isolation as scheduled and specified. Reference Section 23 05 48, Vibration and Seismic Controls for HVAC Piping and Equipment.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 922
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC FANS 23 34 00-4
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Install in accordance with manufacturer's instructions.
B. Install power ventilators level and plumb.
C. Fans used for exhaust of kitchen grease hoods are to be UL 705 - Supplement SC listed for grease exhaust. Provide fans with grease terminator. Pipe from grease terminator to Code approved location.
D. Fans used for exhaust of moist air are to be constructed of aluminum construction and be warranted for their application in moist conditions.
E. Fans used in welding, chemical, and/or fume exhaust applications are to be of spark-proof construction and are to be protected with coatings as required to protect parts in the air stream from the chemicals and materials the fan will be exposed to.
F. Install floor-mounting units on concrete bases.
G. Units using vibration isolation devices are scheduled on Drawings.
H. Support suspended units from structure threaded steel rods and vibration isolation device scheduled on Drawings.
I. In seismic zones, restrain support units.
J. Install units with clearances for service and maintenance.
K. Provide fixed sheaves required for final air balance.
L. Provide safety screen where inlet or outlet is exposed.
M. Pipe scroll drains to nearest floor drain.
N. Provide backdraft dampers on discharge of exhaust fans and as indicated on Drawings.
O. Duct installation and connection requirements are specified in other Division 23, HVAC Sections. Drawings indicate general arrangement of ducts and duct accessories. Make final duct connections with flexible connectors per Section 23 33 00, Air Duct Accessories.
P. Install ducts adjacent to power ventilators to allow service and maintenance.
Q. Ground equipment.
R. Tighten electrical connectors and terminals according to manufacturer's published torque- tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.
S. Equipment Startup Checks:
1. Verify that shipping, blocking, and bracing are removed.
2. Verify that unit is secure on mountings and supporting devices and that connections to ducts and electrical components are complete. Verify that proper thermal-overload protection is installed in motors, starters, and disconnect switches.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 923
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
HVAC FANS 23 34 00-5
3. Verify that cleaning and adjusting are complete.
4. Disconnect fan drive from motor, verify proper motor rotation direction, and verify fan wheel free rotation and smooth bearing operation. Reconnect fan drive system, align and adjust belts, and install belt guards.
5. Verify lubrication from bearings and other moving parts.
6. Verify that manual and automatic volume control and fire and smoke dampers in connected ductwork systems are in fully open position.
7. Disable automatic temperature-control operators.
T. Starting Procedures:
1. Energize motor and adjust fan to indicated rpm.
2. Measure and record voltage and amperage.
U. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. Remove malfunctioning units, replace with new units, and retest.
V. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
W. Shut unit down and reconnect automatic temperature-control operators.
X. Replace fan and motor pulleys as required to achieve design airflow.
Y. Provide totally enclosed fan cooled motors when motor is located outdoors, whether under a cover or not, or exposed to moisture. Provide protective covering for electronically commutated motors located in outdoor or wet/wash-down locations.
Z. Repair or replace malfunctioning units. Retest as specified above after repairs or replacements are made.
AA. Adjust damper linkages for proper damper operation.
BB. Adjust belt tension.
CC. Lubricate bearings.
DD. On completion of installation, internally clean fans according to manufacturer's written instructions. Remove foreign material and construction debris. Vacuum fan wheel and cabinet.
EE. After completing system installation, including outlet fitting and devices, inspect exposed finish.
Remove burrs, dirt, and construction debris and repair damaged finishes.
FF. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain HVAC fans. Train Owner's maintenance personnel on procedures and schedules for starting and stopping, troubleshooting, servicing, and maintaining equipment and schedules.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 924
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR TERMINAL UNITS 23 36 00-1
SECTION 23 36 00
AIR TERMINAL UNITS
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Single Duct Variable Volume and Constant Volume Units
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Air Terminal Units:
1. Titus
2. Or approved equivalent.
2.2 SINGLE DUCT VARIABLE VOLUME AND CONSTANT VOLUME UNITS A. Casings: Minimum 22 gauge galvanized steel.
B. 1/2-inch dual density insulation which complies with UL 181 and NFPA 90A. Exposed insulation edges to be coated with NFPA 90A approved sealant to prevent entrainment of fibers in the airstream.
C. Plenum Air Inlets: Round stub connections or S slip drive connections for duct attachment.
D. Plenum Air Outlets: S slip and drive connections.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 925
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR TERMINAL UNITS 23 36 00-2
E. Casing Leakage: Maximum casing leakage not to exceed 10 cfm at 1-inch static pressure for inlet size larger than 12-inches and not to exceed 7 cfm at 1-inch static pressure for inlet size 12-inches and smaller.
1. Configuration: Air volume damper assembly inside unit casing. Locate control components inside protective metal shroud.
2. Volume Damper: Construct of galvanized steel with peripheral gasket and self lubricating bearings; maximum damper leakage: 7 cfm maximum at inlet static pressure. Shaft to be clearly marked on the end to indicate damper position. Stickers or other removable markings are not acceptable. Damper to incorporate a mechanical stop to prevent overstroking and a synthetic seal to limit close off leakage to the maximum values shown in the damper leakage table.
3. Flow Sensor: Integral averaging type flow sensor utilizing multiple sensing points with unit mounted calibration chart.
F. Attenuator Section: Line attenuator sections with 2-inch thick insulation.
G. Hot Water Heating Coil:
1. Construction: 1/2-inch copper tube mechanically expanded into aluminum plate fins, leak tested under water to 200 PSIG pressure, factory installed.
H. Acoustics: Sound ratings tested as power level 10-12 watts in accordance with AHRI 880 I-P at
1.5-inches wg inlet static pressure. NC ratings calculated per AHRI 885 with room attenuations as listed in Appendix E, and not to exceed values scheduled on Drawings.
1. MAXIMUM AIRBORNE SOUND POWER (db)
a. OCTAVE BAND AND CENTER FREQUENCY (HZ)
b. Units must have 5-feet of 2-inch thick lined duct downstream of terminal unit.
CFM 2 3 4 5 6 7
125 250 500 1K 2K 4K
0-300 69 65 63 60 60 55
301-400 70 69 64 60 60 55
401-800 72 70 67 64 60 55
801-1100 74 71 68 67 60 60
1101-1700 75 73 70 67 60 60
1701 and
above
80 78 76 67 63 62
2. MAXIMUM RADIATED SOUND POWER (db)
a. OCTAVE BAND AND CENTER FREQUENCY (HZ)
CFM 2 3 4 5 6 7
125 250 500 1K 2K 4K
All 71 65 61 55 55 50
I. DDC Controls: Damper operator, sensor, and other devices compatible with temperature controls specified in Section 23 09 00, Instrumentation and Control Performance Specifications.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
A. Install in accordance with manufacturer's instructions. Install level and plumb.
B. Verify that installation of each air terminal is according to the Contract Documents.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 926
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR TERMINAL UNITS 23 36 00-3
C. Check that inlet duct connections are as recommended by air terminal manufacturer to achieve proper performance.
D. Check that controls and control enclosure are accessible.
E. Verify that control connections are complete.
F. Check that nameplate and identification tag are visible.
G. Verify that controls respond to inputs as specified.
H. Provide ceiling access doors or locate units above easily removable ceiling components.
I. Support units individually from structure. Do not support from adjacent ductwork.
J. Provide 9-inch by 9-inch access door with quarter turn latches upstream and downstream of each heating coil.
K. Provide minimum five duct diameters minimum straight duct run upstream of terminal unit.
L. Minimum of 3-feet straight duct downstream of terminal unit prior to first outlet or first branch duct.
M. Branch inlet duct size to match unit inlet connection. For branch inlet ducts over 15-feet long, increase branch duct size one size and provide transition immediately upstream of minimum straight duct run.
N. Connect to ductwork in accordance with Section 23 31 00, HVAC Ducts and Casings.
O. Provide minimum of five feet of 1-inch thick lined ductwork downstream of units. Lining to match terminal unit lining type.
1. Do not provide lined ductwork in group "H" occupancies.
P. Verify that electric power is available and of the correct characteristics.
Q. Balance unit to air flows scheduled.
R. Upon completion of installation and prior to initial operation, test and demonstrate that air terminals and duct connection to air terminals are leak tight. Repair or replace air terminals and duct connections as required to eliminate leaks and retest to demonstrate compliance.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 927
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR OUTLETS AND INLETS 23 37 00-1
SECTION 23 37 00
AIR OUTLETS AND INLETS
PART 1 - GENERAL
1.1SUMMARY
A. Work Included:
1. Grilles, Registers, Diffusers
1.2 RELATED SECTIONS
A. Contents of Division 23, HVAC and Division 01, General Requirements apply to this Section.
1.3 REFERENCES AND STANDARDS
A. References and Standards as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
1.4 SUBMITTALS
A. Submittals as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, provide:
1. Data Sheet: For each type of air outlet and inlet, and accessory furnished; indicate construction, finish, and mounting details.
2. Performance Data: Include throw and drop, static-pressure drop, and noise ratings for each type of air outlet and inlet.
3. Schedule of diffusers, registers, and grilles indicating drawing designation, room location, quantity, model number, size and accessories furnished.
1.5 QUALITY ASSURANCE
A. Quality assurance as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
B. In addition, meet the following:
1. Air Distribution Diffuser, Register, and Grille Schedule lists Basis of Design, with any specialty accessories, construction, finish or other criteria noted on schedule. Submitted air distribution must match criteria of Basis of Design:
a. Construction materials and appearance.
b. Frame/installation method.
c. Isothermal throw plus or minus 5 percent at design flows shown on drawings. d. Noise Criteria: NC value plus or minus 1 at design flows shown on drawings. e. Accessories: Equal to Basis of Design.
1.6 WARRANTY
A. Warranty of materials and workmanship as required by Section 23 00 00, HVAC Basic Requirements and Division 01, General Requirements.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 928
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR OUTLETS AND INLETS 23 37 00-2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. General: Manufacturer's standard products of categories and types required for each application as referenced in other Division 23, HVAC sections, where more than a single type is specified for the application, provide single selection for each product category.
B. Grilles, Registers, Diffusers:
1. Anemostat
2. Carnes
3. Environmental Air Products
4. Krueger
5. Metalaire
6. Nailor
7. Price Co.
8. Shoemaker
9. Titus
10. Tuttle & Bailey
11. Seiho
12. Or approved equivalent.
2.2 GRILLES, REGISTERS, DIFFUSERS
A. Diffuser, Register and Grille Schedule lists Basis of Design, with specialty accessories, construction, finish or other criteria noted on schedule. Submitted air distribution must match criteria of Basis of Design, including accessories and finish:
1. Matching construction materials and appearance. Equal installation method/frame.
2. Pressure drop equal to or less than Basis of Design at CFM on Drawings.
3. Throw: Isothermal jet throw plus or minus 5 percent of Basis of Design at CFM listed on Drawings.
4. Noise Criteria: Plus or minus 1 NC of Basis of Design at CFM listed on Drawings. If Basis of Design NC is below registered level, submitted must match. NC rating with 10 dB room factor or less.
B. Provide 1-, 2-, 3-, or 4-way deflection as indicated on Drawings.
C. Provide pattern controllers for linear supply air diffusers.
D. Register Dampers: Dampers utilized with grilles. Opposed blade dampers utilizing a side operated worm drive which provides external duct operation. Slot the end of the shaft to receive a screwdriver. Factory assembled side operator. Construct of the same material as the grille.
Manufacturer same as grilles/diffuser.
E. Coordinate mounting frames with ceiling construction type. Verify per reflected ceiling plans.
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION
A. Install in accordance with manufacturer's instructions. Provide seismic supports, clips, and bracing per local code. Coordinate installation of framing. Provide complete coverage of rough openings by integral device flanges or auxiliary frames. Where above ceiling location is unconditioned space, caulk rough openings; repair and re-paint locations where dust entrainment streaks develop due to unsealed openings.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 929
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
AIR OUTLETS AND INLETS 23 37 00-3
B. Damp locations, such as lockers, restrooms, showers, natatoriums, whirlpool/spas, to have aluminum construction even if scheduled otherwise; mounting hardware to be stainless steel.
C. Check location of outlets and inlets and make necessary adjustments in position to conform with architectural features, symmetry, and lighting arrangement.
D. Unless otherwise shown on drawings, for ceiling mounted air outlets with adjustable airflow pattern controllers mounted at a height of 12 feet or less, adjust the air outlets for horizontal air distribution, and adjust to vertical air distribution for ceiling height above 12 feet.
E. Exterior color of grilles per Architect. White finish if not otherwise scheduled or noted by Architect. Paint ductwork visible behind air outlets and inlets matte black.
F. Ceiling Membrane: Protect ceiling membrane per code. Fire caulk around openings. Provide listed radiation damper in rated roof/ceiling or floor/ceiling assemblies as required per code.
G. After installation of diffusers, registers, and grilles, inspect exposed finish. Clean exposed surfaces to remove burrs, dirt, and smudges. Replace diffusers, registers, and grilles that have damaged finishes.
3.2 GRILLES, REGISTERS, DIFFUSERS INSTALLATION
A. Coordinate with Architectural Reflected Ceiling Plan(s). Reflected ceiling plans determine final locations.
B. Install diffusers to ductwork with air tight connection. 18-inch straight duct section or acoustic plenum at connection. Provide square to round adapters where required for connection to round ducts.
C. Provide integral balancing dampers for diffusers, and grilles and registers where duct manual balancing dampers are not shown or specified.
D. Linear Slot Diffusers:
1. Coordinate connection plenum dimensions with linear slot final dimensions to conform with manufacturer's recommendations, or as indicated. Total and active lengths as noted on drawings. Blank off unused sections. Coordinate frame type with Architect.
2. Paint surfaces visible behind air outlets and inlets, including blank-off sections, matte black unless otherwise called for on drawings.
END OF SECTION
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 930
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-1
SECTION 26 00 00
ELECTRICAL BASIC REQUIREMENTS
PART 1 - GENERAL
1.1SECTION INCLUDES
A. Work included in 26 00 00, Electrical Basic Requirements applies to Division 26, Electrical work to provide materials, labor, tools, permits, incidentals, and other services to provide and make ready for Owner's use of electrical systems for proposed project.
B. Contract Documents include, but are not limited to, Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements, Drawings, Addenda, Owner/Architect Agreement, and Owner/Contractor Agreement. Confirm requirements before commencement of work.
C. Definitions:
1. Provide: To furnish and install, complete and ready for intended use.
2. Furnish: Supply and deliver to project site, ready for unpacking, assembly and installation.
3. Install: Includes unloading, unpacking, assembling, erecting, installation, applying, finishing, protecting, cleaning and similar operations at project site as required to complete items of work furnished.
4. Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent", substitution requests must be submitted to Engineer for consideration, in accordance with Division 01, General Requirements, and approved by the Engineer prior to submitting bids for substituted items.
5. Authority Having Jurisdiction (AHJ): Indicates reviewing authorities, including local fire marshal, Owner's insurance underwriter, Owner's Authorized Representative, and other reviewing entity whose approval is required to obtain systems acceptance.
1.2 RELATED SECTIONS
A. Contents of Section applies to Division 26, Electrical Contract Documents.
B. Related Work:
1. Additional conditions apply to this Division including, but not limited to:
a. Specifications including Division 00, Procurement and Contracting Requirements and Division 01, General Requirements.
b. Drawings
c. Addenda
d. Owner/Architect Agreement
e. Owner/Contractor Agreement
f. Codes, Standards, Public Ordinances and Permits
1.3 REFERENCES AND STANDARDS
A. References and Standards per Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, individual Division 26, Electrical Sections and those listed in this Section.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 931
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-2
B. Codes to include latest adopted editions, including current amendments, supplements and local jurisdiction requirements in effect as of the date of the Contract Documents, of/from:
1. State of California:
a. CALGreen - California Green Building Standards Code (CCR, Title 24, Part 11) b. CBC - California Building Code
c. CEC - California Electrical Code
d. CEC T24 - California Energy Code Title 24
e. CFC - California Fire Code
f. CMC - California Mechanical Code
g. CPC - California Plumbing Code
h. CSFM - California State Fire Marshal
C. Reference standards and guidelines include but are not limited to the latest adopted editions from:
1. ABA - Architectural Barriers Act
2. ADA - Americans with Disabilities Act
3. ANSI - American National Standards Institute
4. APWA - American Public Works Association
5. ASCE - American Society of Civil Engineers
6. ASHRAE Guideline 0, the Commissioning Process
7. ASTM - ASTM International
8. CFR - Code of Federal Regulations
9. EPA - Environmental Protection Agency
10. ETL - Electrical Testing Laboratories
11. FCC - Federal Communications Commission
12. FM - FM Global
13. IBC - International Building Code
14. IEC - International Electrotechnical Commission
15. IEEE - Institute of Electrical and Electronics Engineers
16. IES - Illuminating Engineering Society
17. ISO - International Organization for Standardization
18. MSS - Manufacturers Standardization Society
19. NEC - National Electric Code
20. NECA - National Electrical Contractors Association
21. NEMA - National Electrical Manufacturers Association
22. NETA - National Electrical Testing Association
23. NFPA - National Fire Protection Association
24. OSHA - Occupational Safety and Health Administration
25. UL - Underwriters Laboratories Inc.
D. See Division 26, Electrical individual Sections for additional references.
1.4 SUBMITTALS
A. See Division 01, General Requirements for Submittal Procedures as well as individual Division 26, Electrical Sections.
B. Provide drawings in format and software release equal to the design documents. Drawings to be the same sheet size and scale as the Contract Documents.
C. In addition:
1. "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract Documents. Contractor is responsible for the dimensions and quantity and will October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 932
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-3
confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work.
2. Provide product submittals and shop drawings in electronic format only. Electronic format must be submitted via zip file via e-mail. For electronic format, provide one file per division containing one bookmarked PDF file with each bookmark corresponding to each Specification Section. Provide a table of contents identifying the products being submitted for each specification section. Arrange bookmarks in ascending order of Specification Section number. Individual submittals sent piecemeal in a per Specification Section method will be returned without review or comment. All transmissions/submissions to be submitted to Architect. Deviations will be returned without review. a. Provide separate submittals for lighting control cutsheets, and for lighting control shop drawings.
3. Product Data: Provide manufacturer's descriptive literature for products specified in Division 26, Electrical Sections.
4. Identify/mark each submittal in detail. Note what differences, if any, exist between the submitted item and the specified item. Failure to identify the differences will be considered cause for disapproval. If differences are not identified and/or not discovered during the submittal review process, Contractor remains responsible for providing equipment and materials that meet the Specifications and Drawings. a. Label submittal to match numbering/references as shown in Contract Documents.
Highlight and label applicable information to individual equipment or cross out/remove extraneous data not applicable to submitted model. Clearly note options and accessories to be provided, including field installed items. Highlight connections by/to other trades.
b. Include technical data, installation instructions and dimensioned drawings for products, fixtures, equipment and devices installed, furnished or provided.
Reference individual Division 26, Electrical specification Sections for specific items required in product data submittal outside of these requirements. c. See Division 26, Electrical individual Sections for additional submittal requirements outside of these requirements.
5. Maximum of two reviews of complete submittal package. Arrange for additional reviews and/or early review of long-lead items; bear costs of these additional reviews at Engineer's hourly rates. Incomplete submittal packages/submittals will be returned to contractor without review.
6. Trade Coordination: Include physical characteristics, electrical characteristics, device layout plans, wiring diagrams, and connections as required per Division 26, Electrical Coordination Documents. For equipment with electrical connections, furnish copy of approved submittal for inclusion in Division 26, Electrical submittals. Electric motors are supplied and installed by Division 23 unless otherwise specified. During shop drawing stage of the project, verify correct disconnect sizes, conductor sizes, etc., and bring any discrepancies to the attention of the Mechanical trade. Be responsible for any modifications to electrical equipment or installations as a result of equipment incompatibility discovered after shop drawing review.
7. Make provisions for openings in building for admittance of equipment prior to start of construction or ordering of equipment.
8. Substitutions and Variation from Basis of Design:
a. The Basis of Design designated product establishes the qualities and characteristics for the evaluation of any comparable products by other listed acceptable manufacturers if included in this Specification or included in an approved Substitution Request as judged by the Design Professional. b. If substitutions and/or equivalent equipment/products are being proposed, it is the responsibility of parties concerned, involved in, and furnishing the substitute and/or equivalent equipment to verify and compare the characteristics and requirements of that furnished to that specified and/or shown. If greater capacity and/or more materials and/or more labor is required for the rough-in, circuitry or connections October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 933
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-4
than for the item specified and provided for, then provide compensation for additional charges required for the proper rough-in, circuitry and connections for the equipment being furnished. No additional charges above the Base Bid, including resulting charges for work performed under other Divisions, will be allowed for such revisions. Coordinate with the requirements of "Submittals." For any product marked "or approved equivalent," a substitution request must be submitted to Engineer for approval prior to purchase, delivery or installation.
9. Shop Drawings: Provide coordinated shop drawings which include physical characteristics of all systems, device layout plans, and control wiring diagrams.
Reference individual Division 26, Electrical specification Sections for additional requirements for shop drawings outside of these requirements. a. Provide Shop Drawings indicating access panel locations, size and elevation for approval prior to installation.
10. Samples: Provide samples when requested by individual Sections.
11. Resubmission Requirements:
a. Make corrections or changes in submittals as required in response to Engineer’s comments. Provide a cover letter with resubmittal that includes responses to each of the Engineer’s submittal review comments and identifies changes in the resubmittal. Cloud changes in the submittals.
1) Resubmit for review until review indicates “no exception taken” or “make corrections noted.”
2) When submitting drawings for Engineer's re-review, clearly indicate changes on drawings and cloud any revisions. Submit a list describing each change.
12. Operation and Maintenance Manuals, Owner's Instructions:
a. Submit, at one time, electronic files (PDF format) of manufacturer's operation and maintenance instruction manuals and parts lists for equipment or items requiring servicing. Submit data when work is substantially complete and in same order format as submittals. Include name and location of source parts and service for each piece of equipment.
1) Include copy of approved submittal data along with submittal review letters received from Engineer. Data to clearly indicate installed equipment model numbers. Delete or cross out data pertaining to other equipment not specific to this project.
2) Include copy of manufacturer's standard Operations and Maintenance for equipment. At front of each tab, provide routine maintenance documentation for scheduled equipment. Include manufacturer's recommended maintenance schedule and highlight maintenance required to maintain warranty. Furnish list of routine maintenance parts, including part numbers, sizes, quantities, relevant to each piece of equipment. 3) Include Warranty per Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
4) Include product certificates of warranties and guarantees. 5) Include copy of complete parts list for equipment. Include available exploded views of assemblies and sub assemblies.
6) Include commissioning reports.
7) Include copy of startup and test reports specific to each piece of equipment. 8) Engineer will return incomplete documentation without review. Engineer will provide one set of review comments in Submittal Review format. Contractor must arrange for additional reviews; Contractor to bear costs for additional reviews at Engineer's hourly rates.
b. Thoroughly instruct Owner in proper operation of equipment and systems. Where noted in individual Sections, training will include classroom instruction with applicable training aids and systems demonstrations. Field instruction per Section 26 00 00, Electrical Basic Requirements, Demonstration.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 934
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-5
c. Copies of certificates of code authority inspections, acceptance, code required acceptance tests, letter of conformance and other special guarantees, certificates of warranties, specified elsewhere or indicated on Drawings.
13. Record Drawings:
a. Maintain at site at least one set of drawings for recording “As-constructed” conditions. Indicate on drawings changes to original documents by referencing revision document, and include buried elements, location of conduit, and location of concealed electrical items. Include items changed by field orders, supplemental instructions, and constructed conditions.
b. Record Drawings are to include equipment and fixture/connection schedules that accurately reflect "as constructed or installed" for project. c. At completion of project, input changes to original project on Revit Model and make one set of black-line drawings created from Revit Model in version/release equal to contract drawings. Submit Revit Model and drawings upon substantial completion.
d. Record drawings solely referencing field orders, supplemental instructions, etc. without any revision markups based on the change responses are not acceptable. e. See Division 26, Electrical individual Sections for additional items to include in record drawings.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Work and materials installed to conform with all local, State and Federal codes, and other applicable laws and regulations. Where code requirements are at variance with Contract Documents, meet code requirements as a minimum requirement and include costs necessary to meet these in Contract. Machinery and equipment are to comply with OSHA requirements, as currently revised and interpreted for equipment manufacturer requirements. Install equipment provided per manufacturer recommendations.
B. Whenever this Specification calls for material, workmanship, arrangement or construction of higher quality and/or capacity than that required by governing codes, higher quality and/or capacity take precedence.
C. Drawings are intended to be diagrammatic and reflect the Basis of Design manufacturer's equipment. They are not intended to show every item in its exact dimensions, or details of equipment or proposed systems layout. Verify actual dimensions of systems (i.e. distribution equipment, duct banks, light fixtures, etc.) and equipment proposed to assure that systems and equipment will fit in available space. Contractor is responsible for design and construction costs incurred for equipment other than Basis of Design, including, but not limited to, architectural, structural, electrical, HVAC, fire sprinkler, and plumbing systems.
D. Manufacturer's Instructions: Follow manufacturer's written instructions. If in conflict with Contract Documents, obtain clarification. Notify Engineer/Architect, in writing, before starting work.
E. Items shown on Drawings are not necessarily included in Specifications or vice versa. Confirm requirements in all Contract Documents.
F. Making, supervising, or directing the making of an electrical installation which does not meet minimum safety standards is not allowed.
G. Except as authorized by the Authority Having Jurisdiction, do not remove, transfer, alter or otherwise tamper with an inspection permit, label, tag or other indicia of inspection placed on or at an electrical job site, electrical installation or electrical product.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 935
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-6
1.6 WARRANTY
A. Provide written warranty covering the work for a period of one year from date of Substantial Completion in accordance with Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Sections under this Division can require additional and/or extended warranties that apply beyond basic warranty under Division 01, General Requirements and the General Conditions.
Confirm requirements in all Contract Documents.
1.7 COORDINATION DOCUMENTS
A. Prior to construction, prepare and submit coordinated layout drawings (composite drawings), to coordinate installation and location of HVAC equipment, ductwork, grilles, diffusers, piping, plumbing equipment/fixtures, fire sprinklers, plumbing, lights, cable tray and electrical services with architectural and structural requirements, and other trades (including plumbing, fire protection, electrical, ceiling suspension, and tile systems), and provide maintenance access requirements. Coordinate with submitted architectural systems (i.e roofing, ceiling, finishes) and structural systems as submitted, including footings and foundation. Identify zone of influence from footings and ensure systems are not routed within the zone of influence.
B. Coordination drawings to be provided for the following systems, at a minimum, for review and approval:
1. Routing of Raceways and Boxes
2. Lighting
C. Prepare Drawings as follows:
1. Drawings in Revit Model. Revit Model release equal to design documents. Drawings to be same sheet size and scale as Contract Drawings and indicate location, size and elevation above finished floor of equipment and distribution systems.
2. Review and revise, as necessary, section cuts in Contract Drawings after verification of field conditions.
3. Incorporate Addenda items and change orders.
4. Provide additional coordination as requested by other trades.
D. Advise Architect in event conflict occurs in location or connection of equipment. Bear costs resulting from failure to properly coordinate installation or failure to advise Architect of conflict.
E. Verify in field exact size, location, and clearances regarding existing material, equipment and apparatus, and advise Architect of discrepancies between that indicated on Drawings and that existing in field prior to installation related thereto.
F. Submit final Coordination Drawings with changes as Record Drawings at completion of project.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Articles, fixtures, and equipment of a kind to be standard product of one manufacturer.
2.2 STANDARDS OF MATERIALS AND WORKMANSHIP
A. Base contract upon furnishing materials as specified. Materials, equipment, and fixtures used for construction are to be new, latest products as listed in manufacturer's printed catalog data October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 936
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-7
and are to be UL or ETL listed and labeled or be approved by State, County, and City authorities prior to procurement and installation.
B. Names and manufacturer's names denote character and quality of equipment desired and are not to be construed as limiting competition.
C. Hazardous Materials:
1. Comply with local, State of California, and Federal regulations relating to hazardous materials.
2. Comply with Division 00, Procurement and Contracting Requirements and Division 01, General Requirements for this project relating to hazardous materials.
3. Do not use any materials containing a hazardous substance. If hazardous materials are encountered, do not disturb; immediately notify Owner and Architect. Hazardous materials will be removed by Owner under separate contract.
PART 3 - EXECUTION
3.1 ACCESSIBILITY AND INSTALLATION
A. Confirm Accessibility and Installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Install equipment requiring access (i.e., junction boxes, light fixtures, power supplies, motors, etc.) so that they may be serviced, reset, replaced or recalibrated by service people with normal service tools and equipment. Do not install equipment in passageways, doorways, scuttles or crawlspaces which would impede or block the intended usage.
C. Install equipment and products complete as directed by manufacturer's installation instructions.
Obtain installation instructions from manufacturer prior to rough-in of equipment and examine instructions thoroughly. When requirements of installation instructions conflict with Contract Documents, request clarification from Architect prior to proceeding with installation. This includes proper installation methods, sequencing, and coordination with other trades and disciplines.
D. Firestopping:
1. Confirm requirements in Division 07, Thermal and Moisture Protection. In the absence of specific requirements, comply with individual Division 26, Electrical Sections and the following:
a. Coordinate location and protection level of fire and/or smoke rated walls, ceilings, and floors. When these assemblies are penetrated, seal around piping and equipment with approved firestopping material. Install firestopping material complete as directed by manufacturer's installation instructions. Meet requirements of ASTM E814, Standard Test Method for Fire Tests of Through-Penetration Fire Stops.
E. Plenums:
1. In plenums, provide plenum rated materials that meet the requirements to be installed in plenums. Immediately notify Architect/Engineer of discrepancy.
F. Provide miscellaneous supports/metals required for installation of equipment and conduit.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 937
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-8
3.2 SEISMIC CONTROL
A. Confirm Seismic Control requirements in Division 01, General Requirements, Structural documents, and individual Division 26 Electrical Sections.
B. General:
1. Restraints which are used to prevent disruption of function of piece of equipment because of application of horizontal force to be such that forces are carried to frame of structure in such a way that frame will not be deflected when apparatus is attached to a mounting base and equipment pad, or to structure in normal way, utilizing attachments provided. Secure equipment and distribution systems to withstand a force in direction equal to value defined by jurisdiction having authority.
2. Provide stamped shop drawings from licensed Structural Engineer of seismic bracing and seismic movement assemblies for conduit and equipment. Submit shop drawings along with equipment submittals.
3. Provide stamped shop drawings from licensed Structural Engineer of seismic flexible joints for conduit crossing building expansion or seismic joints. Submit shop drawings along with seismic bracing details.
4. Provide means to prohibit excessive motion of electrical equipment during earthquake.
3.3 REVIEW AND OBSERVATION
A. Confirm Review and Observation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Notify Architect, in writing, at following stages of construction so that they may, at their option, visit site for review and construction observation:
1. Underground conduit installation prior to backfilling.
2. Prior to covering walls.
3. Prior to ceiling cover/installation.
4. When main systems, or portions of, are being tested and ready for inspection by AHJ.
C. Final Punch:
1. Prior to requesting a final punch visit from the Engineer, request from Engineer the Electrical Precloseout Checklist, complete the checklist confirming completion of systems’ installation, and return to Engineer. Request a final punch visit from the Engineer, upon Engineer's acceptance that the electrical systems are ready for final punch.
2. Costs incurred by additional trips required due to incomplete systems will be the responsibility of the Contractor.
3.4 CONTINUITY OF SERVICE
A. Confirm requirements in Division 00, Procurement and Contracting Requirements, and Division 01, General Requirements. In the absence of specific requirements in Division 01, General Requirements, comply with individual Division 26, Electrical Sections and the following:
1. During remodeling or addition to existing structure, while existing structure is occupied, present services to remain intact until new construction, facilities or equipment is installed.
2. Prior to changing over to new service, verify that every item is thoroughly prepared.
Install new wiring, and wiring to point of connection.
3. Coordinate transfer time to new service with Owner. If required, perform transfer during off-peak hours. Once changeover is started, pursue to its completion to keep interference to a minimum.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 938
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-9
a. If overtime is necessary, there will be no allowance made by Owner for extra expense for such overtime or shift work.
4. No interruption of services to any part of existing facilities will be permitted without express permission in each instance from Owner. Requests for outages must state specific dates, hours and maximum durations, with outages kept to these specific dates, hours and maximum durations. Obtain written permission from Owner for any interruption of power, lighting or signal circuits and systems.
a. Organize work to minimize duration of power interruption. b. Coordinate utility service outages with utility company.
3.5 CUTTING AND PATCHING
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In the absence of specific requirements in Division 01, General Requirements, comply with individual Division 26, Electrical Sections and the following:
1. Proposed floor cutting/core drilling/sleeve locations to be approved by Project Structural Engineer. Submit proposed locations to Architect/Project Structural Engineer. Where slabs are of post tension construction, perform x-ray scan of proposed penetration locations and submit scan results including proposed penetration locations to Project Structural Engineer/Architect for approval. Where slabs are of waffle type construction, show column cap extent and cell locations relative to proposed penetration(s).
2. Cutting, patching and repairing for work specified in this Division including plastering, masonry work, concrete work, carpentry work, and painting included under this Section will be performed by skilled craftspeople of each respective trade in conformance with appropriate Division of Work.
3. Additional openings required in building construction to be made by drilling or cutting.
Use of jack hammer is specifically prohibited. Patch openings in and through concrete and masonry with grout.
4. Restore new or existing work that is cut and/or damaged to original condition. Patch and repair specifically where existing items have been removed. This includes repairing and painting walls, ceilings, etc. where existing conduit and devices are removed as part of this project. Where alterations disturb lawns, paving, and/or walks, surfaces to be repaired, refinished and left in condition matching existing prior to commencement of work.
5. Additional work required by lack of proper coordination will be provided at no additional cost to the Owner.
3.6 EQUIPMENT SELECTION AND SERVICEABILITY
A. Replace or reposition equipment which is too large or located incorrectly to permit servicing, at no additional cost to Owner.
3.7 DELIVERY, STORAGE AND HANDLING
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In the absence of specific requirements, comply with individual Division 26, Electrical Sections and the following:
1. Handle materials delivered to project site with care to avoid damage. Store materials on site inside building or protected from weather, dirt and construction dust. Products and/or materials that become damaged due to water, dirt, and/or dust as a result of improper storage and handling to be replaced before installation.
2. Protect equipment to avoid damage. Close conduit openings with caps or plugs. Keep motors and bearings in watertight and dustproof covers during entire course of installation.
3. Protect bus duct and similar items until in service.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 939
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-10
3.8 DEMONSTRATION
A. Confirm Demonstration requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, and individual Division 26, Electrical Sections.
B. Upon completion of work and adjustment of equipment, test systems and demonstrate to Owner's Authorized Representative, Architect, and Engineer that equipment furnished and installed or connected under provisions of these Specifications functions in manner required.
Provide field instruction to Owner's Maintenance Staff as specified in Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
C. Manufacturer's Field Services: Furnish services of a qualified person at time approved by Owner, to instruct maintenance personnel, correct defects or deficiencies, and demonstrate to satisfaction of Owner that entire system is operating in satisfactory manner and complies with requirements of other trades that may be required to complete work. Complete instruction and demonstration prior to final job site observations.
3.9 CLEANING
A. Confirm Cleaning requirements in Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Upon completion of installation, thoroughly clean electrical equipment, removing dirt, debris, dust, temporary labels and traces of foreign substances. Throughout work, remove construction debris and surplus materials accumulated during work.
3.10 INSTALLATION
A. Confirm Installation requirements in Division 00, Procurement and Contracting Requirements, Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Install equipment and fixtures in accordance with manufacturers' installation instructions, plumb and level and firmly anchored to vibration isolators. Maintain manufacturer's recommended clearances.
C. Start up equipment, in accordance with manufacturer's start-up instructions, and in presence of manufacturer's representative. Test controls and demonstrate compliance with requirements.
Replace damaged or malfunctioning controls and equipment.
D. Provide miscellaneous supports/metals required for installation of equipment.
3.11 PAINTING
A. Confirm requirements in Division 01, General Requirements and Division 09, Finishes. In the absence of specific requirements, comply with individual Division 26, Electrical Sections and the following:
1. Ferrous Metal: After completion of work, thoroughly clean and paint exposed supports constructed of ferrous metal surfaces (i.e., hangers, hanger rods, equipment stands, etc.) with one coat of black asphalt varnish for exterior or black enamel for interior, suitable for hot surfaces.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 940
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-11
2. In Electrical Room, on roof or other exposed areas, equipment not painted with enamel to receive two coats of primer and one coat of rustproof enamel, colors as selected by Architect.
3. See individual equipment Specifications for other painting.
4. Structural Steel: Repair damage to structural steel finishes or finishes of other materials damaged by cutting, welding or patching to match original.
5. Conduit: Clean, primer coat and paint interior/exterior conduit exposed in public areas with two coats paint suitable for metallic surfaces. Color selected by Architect.
6. Covers: Covers such as manholes, vaults and the like will be furnished with finishes which resist corrosion and rust.
3.12 DEMOLITION
A. Confirm requirements in Division 01, General Requirements and Division 02, Existing Conditions. In the absence of specific requirements, comply with individual Division 26, Electrical Sections and the following:
1. It is the intent of these documents to provide necessary information and adjustments to electrical system required to meet code, and accommodate installation of new work.
2. Coordinate with Owner so that work can be scheduled not to interrupt operations, normal activities, building access or access to different areas. Owner will cooperate to best of their ability to assist in coordinated schedule, but will remain final authority as to time of work permitted.
3. Examination:
a. Determine exact location of existing utilities and equipment before commencing work, compensate Owner for damages caused by failure to locate and preserve utilities. Replace damaged items with new material to match existing. b. Verify that abandoned wiring and equipment serve only abandoned facilities. c. Demolition drawings are based on casual field observation and existing record documents.
1) Verify accuracy of information shown prior to bidding and provide such labor and material as is necessary to accomplish work.
2) Verify location and number of electrical outlets, luminaires, panels, etc. in field.
d. Report discrepancies to Architect before disturbing existing installation. 1) Promptly notify Owner if utilities are found which are not shown on Drawings.
4. Execution:
a. Remove existing luminaires, switches, receptacles, and other electrical equipment and devices and associated wiring from walls, ceilings, floors, and other surfaces scheduled for remodeling, relocation, or demolition unless shown as retained or relocated on Drawings.
b. Provide temporary wiring and connections to maintain electrical continuity of existing systems during construction. Remove or relocate electrical boxes, conduit, wiring, equipment, and luminaires, as encountered in removed or remodeled areas in existing construction affected by this work.
c. Remove and restore wiring which serves usable existing outlets clear of construction or demolition.
d. If existing junction boxes will be made inaccessible, or if abandoned outlets serve as feed through boxes for other existing electrical equipment which is being retained, provide new conduit and wire to bypass inaccessible junction boxes and abandoned outlets.
e. If existing conduits pass through partitions or ceiling which are being removed or remodeled, provide new conduit and wire to reroute clear of construction or demolition and maintain service to existing load.
f. Extend circuiting and devices in existing walls to be furred out. g. Remove abandoned wiring to source of supply.
October 27, 2025
Construction Documents
9.l
January 12, 2026
Packet Pg. 941
WRNS Studio
Project No:
SAN CARLOS LIBRARY
San Carlos CA
February 12, 2025 Permit Set
ELECTRICAL BASIC REQUIREMENTS 26 00 00-12
h. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.
i. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets which are not removed.
j. Disconnect and remove electrical devices and equipment serving utilization equipment that has been removed.
k. Existing lighting which is to remain, leave luminaires in proper working order. l. Repair adjacent construction and finishes damaged during demolition work. m. Maintain access to existing electrical installations which remain active. Modify installation or provide access panel as appropriate.
3.13 ACCEPTANCE
A. Confirm requirements in Division 00, Procurement and Contracting Requirements and Division 01, General Requirements. In the absence of specific requirements, comply with individual Division 26, Electrical Sections and the following:
1. System cannot be considered for acceptance until work is completed and demonstrated to Architect that installation is in strict compliance with Specifications, Drawings and manufacturer's installation instructions, particularly in reference to following:
a. Cleaning
b. Operation and Maintenance Manuals
c. Training of Operating Personnel
d. Record Drawings
e. Warranty and Guaranty Certificates
f. Start-up/Test Document and Commissioning Reports
3.14 FIELD QUALITY CONTROL
A. Confirm Field Quality Control requirements in Division 01, General Requirements, Section 26 00 00, Electrical Basic Requirements and individual Division 26, Electrical Sections.
B. Tests:
1. Conduct tests of equipment and systems to demonstrate compliance with requirements specified. Reference individual Specification Sections for required tests. Document tests and include in operation and maintenance manuals.
2. During site evaluations by Architect or Engineer, provide appropriate personnel with tools to remove and replace trims, covers, and devices so that proper evaluation of installation can be performed.