Building Category II BA-64 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $60,001 To $61,000 2021-44;2023-
58;2024-60 CPI $ 1,354.95 $ 1,395.60 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-65 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $61,001 To $62,000 2021-44;2023-
58;2024-60 CPI $ 1,369.68 $ 1,410.77 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-66 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $62,001 To $63,000 2021-44;2023-
58;2024-60 CPI $ 1,384.41 $ 1,425.94 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-67 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $63,001 To $64,000 2021-44;2023-
58;2024-60 CPI $ 1,399.13 $ 1,441.11 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-68 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $64,001 To $65,000 2021-44;2023-
58;2024-60 CPI $ 1,413.86 $ 1,456.27 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-69 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $65,001 To $66,000 2021-44;2023-
58;2024-60 CPI $ 1,428.59 $ 1,471.44 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-70 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $66,001 To $67,000 2021-44;2023-
58;2024-60 CPI $ 1,443.31 $ 1,486.61 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-71 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $67,001 To $68,000 2021-44;2023-
58;2024-60 CPI $ 1,458.04 $ 1,501.78 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-72 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $68,001 To $69,000 2021-44;2023-
58;2024-60 CPI $ 1,472.76 $ 1,516.95 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-73 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $69,001 To $70,000 2021-44;2023-
58;2024-60 CPI $ 1,487.49 $ 1,532.12 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-74 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $70,001 To $71,000 2021-44;2023-
58;2024-60 CPI $ 1,502.22 $ 1,547.28 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-75 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $71,001 To $72,000 2021-44;2023-
58;2024-60 CPI $ 1,516.94 $ 1,562.45 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-76 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $72,001 To $73,000 2021-44;2023-
58;2024-60 CPI $ 1,531.67 $ 1,577.62 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-77 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $73,001 To $74,000 2021-44;2023-
58;2024-60 CPI $ 1,546.40 $ 1,592.79 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-78 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $74,001 To $75,000 2021-44;2023-
58;2024-60 CPI $ 1,561.12 $ 1,607.96 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-79 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $75,001 To $76,000 2021-44;2023-
58;2024-60 CPI $ 1,575.85 $ 1,623.13 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-80 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $76,001 To $77,000 2021-44;2023-
58;2024-60 CPI $ 1,590.58 $ 1,638.29 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-81 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $77,001 To $78,000 2021-44;2023-
58;2024-60 CPI $ 1,605.30 $ 1,653.46 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-82 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $78,001 To $79,000 2021-44;2023-
58;2024-60 CPI $ 1,620.03 $ 1,668.63 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-83 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $79,001 To $80,000 2021-44;2023-
58;2024-60 CPI $ 1,634.76 $ 1,683.80 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-84 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $80,001 To $81,000 2021-44;2023-
58;2024-60 CPI $ 1,649.48 $ 1,698.97 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-85 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $81,001 To $82,000 2021-44;2023-
58;2024-60 CPI $ 1,664.21 $ 1,714.13 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-86 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $82,001 To $83,000 2021-44;2023-
58;2024-60 CPI $ 1,678.93 $ 1,729.30 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-87 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $83,001 To $84,000 2021-44;2023-
58;2024-60 CPI $ 1,693.66 $ 1,744.47 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-88 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $84,001 To $85,000 2021-44;2023-
58;2024-60 CPI $ 1,708.39 $ 1,759.64 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-89 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $85,001 To $86,000 2021-44;2023-
58;2024-60 CPI $ 1,723.11 $ 1,774.81 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-90 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $86,001 To $87,000 2021-44;2023-
58;2024-60 CPI $ 1,737.84 $ 1,789.98 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-91 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $87,001 To $88,000 2021-44;2023-
58;2024-60 CPI $ 1,752.57 $ 1,805.14 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-92 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $88,001 To $89,000 2021-44;2023-
58;2024-60 CPI $ 1,767.29 $ 1,820.31 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-93 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $89,001 To $90,000 2021-44;2023-
58;2024-60 CPI $ 1,782.02 $ 1,835.48 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-94 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $90,001 To $91,000 2021-44;2023-
58;2024-60 CPI $ 1,796.75 $ 1,850.65 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-95 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $91,001 To $92,000 2021-44;2023-
58;2024-60 CPI $ 1,811.47 $ 1,865.82 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-96 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $92,001 To $93,000 2021-44;2023-
58;2024-60 CPI $ 1,826.20 $ 1,880.98 Add Plan Check Fee (85% Building Fee) + Issuance Fee
Building Category II BA-97 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $93,001 To $94,000 2021-44;2023-
58;2024-60 CPI $ 1,840.92 $ 1,896.15 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-98 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $94,001 To $95,000 2021-44;2023-
58;2024-60 CPI $ 1,855.65 $ 1,911.32 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-99 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $95,001 To $96,000 2021-44;2023-
58;2024-60 CPI $ 1,870.38 $ 1,926.49 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-100 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $96,001 To $97,000 2021-44;2023-
58;2024-60 CPI $ 1,885.10 $ 1,941.66 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-101 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $97,001 To $98,000 2021-44;2023-
58;2024-60 CPI $ 1,899.83 $ 1,956.83 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-102 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $98,001 To $99,000 2021-44;2023-
58;2024-60 CPI $ 1,914.56 $ 1,971.99 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-103 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $99,001 To $100,000 2021-44;2023-
58;2024-60 CPI $ 1,929.28 $ 1,987.16 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-104 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $100,001 To $101,000 2021-44;2023-
58;2024-60 CPI $ 1,939.27 $ 1,997.45 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-105 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $101,001 To $102,000 2021-44;2023-
58;2024-60 CPI $ 1,949.25 $ 2,007.73 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-106 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $102,001 To $103,000 2021-44;2023-
58;2024-60 CPI $ 1,959.24 $ 2,018.01 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-107 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $103,001 To $104,000 2021-44;2023-
58;2024-60 CPI $ 1,969.22 $ 2,028.30 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-108 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $104,001 To $105,000 2021-44;2023-
58;2024-60 CPI $ 1,979.20 $ 2,038.58 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-109 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $105,001 To $106,000 2021-44;2023-
58;2024-60 CPI $ 1,989.19 $ 2,048.86 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-110 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $106,001 To $107,000 2021-44;2023-
58;2024-60 CPI $ 1,999.17 $ 2,059.15 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-111 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $107,001 To $108,000 2021-44;2023-
58;2024-60 CPI $ 2,009.16 $ 2,069.43 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-112 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $108,001 To $109,000 2021-44;2023-
58;2024-60 CPI $ 2,019.14 $ 2,079.71 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-113 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $109,001 To $110,000 2021-44;2023-
58;2024-60 CPI $ 2,029.12 $ 2,090.00 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-114 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $110,001 To $111,000 2021-44;2023-
58;2024-60 CPI $ 2,039.11 $ 2,100.28 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-115 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $111,001 To $112,000 2021-44;2023-
58;2024-60 CPI $ 2,049.09 $ 2,110.56 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-116 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $112,001 To $113,000 2021-44;2023-
58;2024-60 CPI $ 2,059.08 $ 2,120.85 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-117 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $113,001 To $114,000 2021-44;2023-
58;2024-60 CPI $ 2,069.06 $ 2,131.13 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-118 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $114,001 To $115,000 2021-44;2023-
58;2024-60 CPI $ 2,079.04 $ 2,141.41 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-119 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $115,001 To $116,000 2021-44;2023-
58;2024-60 CPI $ 2,089.03 $ 2,151.70 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-120 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $116,001 To $117,000 2021-44;2023-
58;2024-60 CPI $ 2,099.01 $ 2,161.98 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-121 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $117,001 To $118,000 2021-44;2023-
58;2024-60 CPI $ 2,109.00 $ 2,172.27 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-122 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $118,001 To $119,000 2021-44;2023-
58;2024-60 CPI $ 2,118.98 $ 2,182.55 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-123 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $119,001 To $120,000 2021-44;2023-
58;2024-60 CPI $ 2,128.96 $ 2,192.83 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-124 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $120,001 To $121,000 2021-44;2023-
58;2024-60 CPI $ 2,138.95 $ 2,203.12 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-125 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $121,001 To $122,000 2021-44;2023-
58;2024-60 CPI $ 2,148.93 $ 2,213.40 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-126 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $122,001 To $123,000 2021-44;2023-
58;2024-60 CPI $ 2,158.92 $ 2,223.68 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-127 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $123,001 To $124,000 2021-44;2023-
58;2024-60 CPI $ 2,168.90 $ 2,233.97 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-128 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $124,001 To $125,000 2021-44;2023-
58;2024-60 CPI $ 2,178.88 $ 2,244.25 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-129 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $125,001 To $126,000 2021-44;2023-
58;2024-60 CPI $ 2,188.87 $ 2,254.53 Add Plan Check Fee (85% Building Fee) + Issuance Fee
Building Category II BA-130 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $126,001 To $127,000 2021-44;2023-
58;2024-60 CPI $ 2,198.85 $ 2,264.82 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-131 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $127,001 To $128,000 2021-44;2023-
58;2024-60 CPI $ 2,208.84 $ 2,275.10 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-132 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $128,001 To $129,000 2021-44;2023-
58;2024-60 CPI $ 2,218.82 $ 2,285.38 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-133 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $129,001 To $130,000 2021-44;2023-
58;2024-60 CPI $ 2,228.80 $ 2,295.67 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-134 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $130,001 To $131,000 2021-44;2023-
58;2024-60 CPI $ 2,238.79 $ 2,305.95 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-135 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $131,001 To $132,000 2021-44;2023-
58;2024-60 CPI $ 2,248.77 $ 2,316.23 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-136 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $132,001 To $133,000 2021-44;2023-
58;2024-60 CPI $ 2,258.76 $ 2,326.52 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-137 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $133,001 To $134,000 2021-44;2023-
58;2024-60 CPI $ 2,268.74 $ 2,336.80 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-138 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $134,001 To $135,000 2021-44;2023-
58;2024-60 CPI $ 2,278.72 $ 2,347.08 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-139 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $135,001 To $136,000 2021-44;2023-
58;2024-60 CPI $ 2,288.71 $ 2,357.37 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-140 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $136,001 To $137,000 2021-44;2023-
58;2024-60 CPI $ 2,298.69 $ 2,367.65 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-141 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $137,001 To $138,000 2021-44;2023-
58;2024-60 CPI $ 2,308.68 $ 2,377.94 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-142 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $138,001 To $139,000 2021-44;2023-
58;2024-60 CPI $ 2,318.66 $ 2,388.22 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-143 Commercial / Residential Alteration/Remodel/Additional Items Valuation From $139,001 To $140,000 2021-44;2023-
58;2024-60 CPI $ 2,328.64 $ 2,398.50 Add Plan Check Fee (85% Building Fee) + Issuance Fee Building Category II BA-144 General Plan Maintenance Fee 2021-44;2023- 58;2024-60 10% 10% Building Permit and Planning applications Building Category II BA-145 Techology Fee 2021-44;2023- 58;2024-60 3% 3% 3% Permit Fees and Planning Applications
Additional Building Fees
Department Category Item No. Fee Schedule Title Fee Item Description Resolution Inflator Current Fees Proposed Fees Notes Building Category II BB-01 Additional Building Fees Issuance Fee 2021-44;2023-58;
2024-60 CPI $ 41.43 $ 42.68
Building Category II BB-02 Additional Building Fees Site inspection not otherwise covered herein by a fee and which is regulated by a Los Angeles County Ordinance 2021-44;2023-58;
2024-60 CPI $ 631.99 $ 650.95
Building Category II BB-03 Additional Building Fees For inspection of any use, occupancy or change in use or occupancy Group R or U Occupancy 2021-44;2023-58;
2024-60 CPI $ 328.10 $ 337.94
Building Category II BB-04 Additional Building Fees Occupancy groups other than R or U - Affected floor area up to 5,000 Sq. Ft 2021-44;2023-58;
2024-60 CPI $ 808.45 $ 832.71
Building Category II BB-05 Additional Building Fees Occupancy groups other than R or U - Affected floor area up to 5,001 to 10,000 Sq. Ft 2021-44;2023-58;
2024-60 CPI $ 972.94 $ 1,002.13
Building Category II BB-06 Additional Building Fees Occupancy groups other than R or U - Affected floor area up to 10,001 to 100,000 Sq. Ft 2021-44;2023-58;
2024-60 CPI $ 1,617.53 $ 1,666.06
Building Category II BB-07 Additional Building Fees Occupancy groups other than R or U - Affected floor area above 100,000 Sq. Ft 2021-44;2023-58;
2024-60 CPI $ 2,451.70 $ 2,525.25
Building Category II BB-08 Additional Building Fees For inspection of the demolition of a building or structure 2021-44;2023-58;
2024-60 CPI $ 245.23 $ 252.59
Building Category II BB-09 Additional Building Fees For inspection or reinspection of Group A-5 structures 2021-44;2023-58;
2024-60 CPI $ 328.10 $ 337.94
Building Category II BB-10 Additional Building Fees For inspection of structures or devices regulated by Chapter 66, first inspection, structure or device 2021-44;2023-58;
2024-60 CPI $ 245.23 $ 252.59
Building Category II BB-11 Additional Building Fees Each Additional structure/device for inspection regulated by Chapter 66 2021-44;2023-58;
2024-60 CPI $ 39.44 $ 40.62
Building Category II BB-12 Additional Building Fees
For application and investigation fee for relocation building permits as required by Chapter 34- Floor Area up to 2,500 Sq. Ft
2021-44;2023-58;
2024-60 CPI $ 653.20 $ 672.80
Building Category II BB-13 Additional Building Fees
For application and investigation fee for relocation building permits as required by Chapter 34- Floor Area 2,501 Sq. Ft & Above
2021-44;2023-58;
2024-60 CPI $ 1,306.66 $ 1,345.86
Building Category II BB-14 Additional Building Fees For investigation and/or permit for trailer coaches required by Chapter 69 2021-44;2023-58;
2024-60 CPI $ 242.99 $ 250.28
Building Category II BB-15 Additional Building Fees For inspections outside of normal business hours, per hour 2021-44;2023-58;
2024-60 CPI $ 147.26 $ 151.68 Per Hour
Building Category II BB-16 Additional Building Fees For inspections for which no fee is specifically indicated, per hour 2021-44;2023-58;
2024-60 CPI $ 147.26 $ 151.68 Per Hour
Building Category II BB-17 Additional Building Fees For inspection of barriers for swimming pools, spas and hot tubs 2021-44;2023-58;
2024-60 CPI $ 138.15 $ 142.30
Building Category II BB-18 Additional Building Fees Search for Office records and single copy microfilmed permit 2021-44;2023-58;
2024-60 CPI $ 4.49 $ 4.63
Building Category II BB-19 Additional Building Fees
For each hour expended responding to public records requests which do not reasonably describe identifiable records
2021-44;2023-58;
2024-60 CPI $ 51.54 $ 53.09
Building Category II BB-20 Additional Building Fees Sor approval in concept review pursuant to the 1976 Coastal Act (Sec 30,000 et seq Public Resources Code) 2021-44;2023-58;
2024-60 CPI $ 195.44 $ 201.30
Building Category II BB-21 Additional Building Fees
For geotechnical site review and processing geological or engineering reports submitted pursuant to sections 110, 111, 113, 1804 and Appendix Section 3309 - Geotechnical site review (to determine if geo reports are required)
2021-44;2023-58;
2024-60 CPI $ 618.76 $ 637.32
Building Category II BB-22 Additional Building Fees
For geotechnical site review and processing geological or engineering reports submitted pursuant to sections 110, 111, 113, 1804 and Appendix Section 3309 - Geotechnical report, site and plan review (review of initial and two addenda reports
2021-44;2023-58;
2024-60 CPI 60%
Percent of the
value of
Adoptedstructure
Building Category II BB-23 Additional Building Fees
For geotechnical site review and processing geological or engineering reports submitted pursuant to sections 110, 111, 113, 1804 and Appendix Section 3309 - Minimum Fee 2021-44;2023-58;
2024-60 CPI $ 1,526.80 $ 1,572.61
Building Category II BB-24 Additional Building Fees
For geotechnical site review and processing geological or engineering reports submitted pursuant to sections 110, 111, 113, 1804 and Appendix Section 3309 - Maximum Fee 2021-44;2023-58;
2024-60 CPI $ 9,843.48 $ 10,138.78
Building Category II BB-25 Additional Building Fees
For geotechnical site review and processing geological or engineering reports submitted pursuant to sections 110, 111, 113, 1804 and Appendix Section 3309 - Review of geotechnical addenda beyond third review 2021-44;2023-58;
2024-60 CPI $ 253.47 $ 261.07 per hour
Building Category II BB-26 Additional Building Fees
Geotechnical site inspections and geotechnical report review PRIOR to building permit application - Geotechnical site review (to determine if geo reports are required)
2021-44;2023-58;
2024-60 CPI $ 618.76 $ 637.32
Building Category II BB-27 Additional Building Fees
Geotechnical site inspections and geotechnical report review PRIOR to building permit application - Geotechnical report and plan review prior to building application
2021-44;2023-58;
2024-60 CPI $ 1,225.79 $ 1,262.56
Building Category II BB-28 Additional Building Fees Geotechnical review of grading plans - 1-1,000 Cubic Yards 2021-44;2023-58;
2024-60 CPI $ 1,010.51 $ 1,040.82
Building Category II BB-29 Additional Building Fees Geotechnical review of grading plans - 1,001-10,000 cubic yards 2021-44;2023-58;
2024-60 CPI $ 1,350.84 $ 1,391.36
Building Category II BB-30 Additional Building Fees Geotechnical review of grading plans - 10,001-100,000 cubic yards 2021-44;2023-58;
2024-60 CPI $ 1,841.17 $ 1,896.41
Building Category II BB-31 Additional Building Fees Geotechnical review of grading plans - 100,001-500,000 cubic yards 2021-44;2023-58;
2024-60 CPI $ 2,420.62 $ 2,493.24
Building Category II BB-32 Additional Building Fees Geotechnical review of grading plans - 500,001 cubic yards and above 2021-44;2023-58;
2024-60 CPI $ 2,420.62 $ 2,493.24
Add
121.20/100,000
Cy of additional
grading
Building Category II BB-33 Additional Building Fees Geotechnical report and grading plan review (review of initial and two addenda reports)- 1-1,000 cubic yards 2021-44;2023-58;
2024-60 CPI $ 2,117.86 $ 2,181.39
Building Category II BB-34 Additional Building Fees
Geotechnical report and grading plan review (review of initial and two addenda reports)- 1,001-10,000 cubic yards
2021-44;2023-58;
2024-60 CPI $ 3,175.79 $ 3,271.06
Building Category II BB-35 Additional Building Fees
Geotechnical report and grading plan review (review of initial and two addenda reports)- 10,001-100,000 cubic yards
2021-44;2023-58;
2024-60 CPI $ 3,855.57 $ 3,971.24
Building Category II BB-36 Additional Building Fees
Geotechnical report and grading plan review (review of initial and two addenda reports)- 100,001-500,000 cubic yards
2021-44;2023-58;
2024-60 CPI $ 5,291.89 $ 5,450.65
Building Category II BB-37 Additional Building Fees
Geotechnical report and grading plan review (review of initial and two addenda reports)- 500,001 cubic yards and above
2021-44;2023-58;
2024-60 CPI $ 5,291.89 $ 5,450.65
Add
182.00/100,000
Cy of additional
grading
Building Category II BB-38 Additional Building Fees
Geotechnical report and grading plan review (review of initial and two addenda reports)- Review of geotechnical addenda beyond third review
2021-44;2023-58;
2024-60 CPI $ 253.47 $ 261.07 Per Hour
Building Category II BB-39 Additional Building Fees For processing Coastal Engineering Reports 2021-44;2023-58;
2024-60 CPI $ 581.44 $ 598.89
Building Category II BB-40 Additional Building Fees For determining occupant load for purposes of parking requirements pursuant to Title 22 2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16
Building Category II BB-41 Additional Building Fees Reproduction of microfilmed plans 2021-44;2023-58;
2024-60 CPI $ 46.55 $ 47.95
Building Category II BB-42 Additional Building Fees Reproduction of microfilmed plans - plus each sheet produced 2021-44;2023-58;
2024-60 CPI $ 4.49 $ 4.63
Building Category II BB-43-01 Additional Building Fees Assignment of house numbers base fee for subdivisions - first house number 2021-44;2023-58;
2024-60 CPI $ 855.13 $ 880.78
Building Category II BB-43-02 Additional Building Fees Assignment of house numbers base fee for subdivisions - each additional house number 2021-44;2023-58;
2024-60 CPI $ 10.61 $ 10.93
Building Category II BB-43-03 Additional Building Fees Assignment of house numbers base fee for non-subdivisions - first house number 2021-44;2023-58;
2024-60 CPI $ 924.64 $ 952.38
Building Category II BB-43-04 Additional Building Fees Assignment of house numbers base fee for non-subdivisions - each additional house number 2021-44;2023-58;
2024-60 CPI $ 10.61 $ 10.93
Building Category II BB-43-05 Additional Building Fees Assignment of house numbers base fee for non-subdivisions - each additional parcel 2021-44;2023-58;
2024-60 CPI $ 69.64 $ 71.73
Building Category II BB-43-06 Additional Building Fees Assignment of house number change base fee - first house number 2021-44;2023-58;
2024-60 CPI $ 1,005.26 $ 1,035.42
Building Category II BB-43-07 Additional Building Fees Assignment of house number change base fee - each additional house number 2021-44;2023-58;
2024-60 CPI $ 19.09 $ 19.67
Building Category II BB-43-08 Additional Building Fees Assignment of house number change base fee - each additional parcel 2021-44;2023-58;
2024-60 CPI $ 79.12 $ 81.50
Building Category II BB-44 Additional Building Fees
For additional review required by complexity of plans or changes, additions or revisions of approved or resubmitted plans or reports
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 Per Hour
Building Category II BB-45 Additional Building Fees For services required behind the first and second check of plans or reports, due to changes, errors or omissions 2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 Per Hour
Building Category II BB-46 Additional Building Fees Issuance of Certificates of Occupancy 2021-44;2023-58;
2024-60 CPI $ 151.76 $ 156.31
Building Category II BB-47 Additional Building Fees Issuance of Temporary Certificates of Occupancy 2021-44;2023-58;
2024-60 CPI $ 227.88 $ 234.72
Building Category II BB-48 Additional Building Fees For each extension of a Temporary Certificate of Occupancy 2021-44;2023-58;
2024-60 CPI $ 151.76 $ 156.31
Building Category II BB-49 Additional Building Fees For processing of 45-day notice pursuant to Section 103.4 2021-44;2023-58;
2024-60 CPI $ 662.69 $ 682.57
Building Category II BB-50 Additional Building Fees For processing and recording a notice of violation pursuant to section 103.4 2021-44;2023-58;
2024-60 CPI $ 526.66 $ 542.46
Building Category II BB-51 Additional Building Fees For processing and recording a Rescission of Notice of Violation pursuant to Section 103.4 2021-44;2023-58;
2024-60 CPI $ 453.02 $ 466.61
Building Category II BB-52 Additional Building Fees For investigation of alternate materials and methods of construction - Initial Fee 2021-44;2023-58;
2024-60 CPI $ 328.47 $ 338.33
Building Category II BB-53 Additional Building Fees
For investigation of alternate materials and methods of construction - For each hour or fraction thereof, in excess of two
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16
Building Category II BB-54 Additional Building Fees
Preliminary plan review for conceptual approval, code application/interpretation prior to submittal of permit application (two staff-hour minimum).
2021-44;2023-58;
2024-60 CPI $ 328.47 $ 338.33
Building Category II BB-55 Additional Building Fees Additional fee beyond minimum, per hour or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 Per Hur
Building Category II BB-56 Additional Building Fees
Review of drawings and data which are sufficient to determine nature and scope of work in lieu of submittal of plans and specifications as defined in Section 107.2 (including pedestrian protection, underground tanks, etc.)
2021-44;2023-58;
2024-60 CPI $ 122.80 $ 126.49
Building Category II BB-57 Additional Building Fees Minimum Plan Check fee for plans to be "standardized" 2021-44;2023-58;
2024-60 CPI $ 225.89 $ 232.66
Building Category II BB-58 Additional Building Fees Plan maintenance fee, 2% of building permit fee (based on valuation of work) 2021-44;2023-58;
2024-60 CPI $ 0.02 Valuation of Work
Building Category II BB-59 Additional Building Fees Plan maintenance fee, 2% of building permit fee (based on valuation of work) - Minimum Fee 2021-44;2023-58;
2024-60 CPI $ 14.85 $ 15.30
Building Category II BB-60 Additional Building Fees Plan maintenance fee, 2% of building permit fee (based on valuation of work) - Maximum Fee 2021-44;2023-58;
2024-60 CPI $ 631.99 $ 650.95
Building Category II BB-61 Additional Building Fees Investigation fee for work done without a required permit shall be equal to the permit fee but not less than 2021-44;2023-58;
2024-60 CPI $ 505.19 $ 520.35
Building Category II BB-62 Additional Building Fees Exception: One or two family dwellings when work is preformed by owner-builder 2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Building Category II BB-63 Additional Building Fees Noncompliance fee, when person fails to comply with written order -Group R-3 occupancy 2021-44;2023-58;
2024-60 CPI $ 151.76 $ 156.31
Building Category II BB-64 Additional Building Fees Noncompliance fee, when person fails to comply with written order - All other occupancies 2021-44;2023-58;
2024-60 CPI $ 303.64 $ 312.75
Building Category II BB-65 Additional Building Fees Request for hearing before Building Board of Appeals 2021-44;2023-58;
2024-60 CPI $ 644.97 $ 664.32
Building Category II BB-66 Additional Building Fees Residential - 1-3 Story - Strong-Motion Instrumentation and Seismic Hazard Mapping Fee (SMI) 2021-44;2023-58;
2024-60 DOC 0.00013 x valuation $0.50 Minimum
Building Category II BB-67 Additional Building Fees Residential over 3 story or Commercial - Strong-Motion Instrumentation and Seismic Hazard Mapping Fee (SMI) 2021-44;2023-58;
2024-60 DOC 0.00028 x valuation $0.50 Minimum
Building Category II BB-68 Additional Building Fees Building Standards Commission (BSC) - Building Permit Valuation $1 - $25,000 or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 1.25 $ 1.29
Building Category II BB-69 Additional Building Fees Building Standards Commission (BSC) - Building Permit Valuation $25,000.01 - $50,000 or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 2.50 $ 2.57
Building Category II BB-70 Additional Building Fees Building Standards Commission (BSC) - Building Permit Valuation $50,000.01 - $75,000 or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 3.74 $ 3.86
Building Category II BB-71 Additional Building Fees Building Standards Commission (BSC) - Building Permit Valuation $75,000.01 - $100,000 or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 4.99 $ 5.14
Building Category II BB-72 Additional Building Fees Building Standards Commission (BSC) - Every $25,000.01 or fraction thereof above $100,000 2021-44;2023-58;
2024-60 CPI $ 1.25 $ 1.29
Building Category II BB-73 Additional Building Fees General Plan Maintenance Fee 2021-44;2023-58;
2024-60 10%
Building Permit
and Planning
applications
Building Category II BB-74 Additional Building Fees Techology Fee 2021-44;2023-58;
2024-60 3%
3% Permit Fees
and Planning
Applications
Building Category II BB-75 Additional Building Fees Plan Check/Permit Extensions CSI $ 130.00 Building Category II BB-76 Additional Building Fees Plan Check/Permit Renewals CSI $ 190.00
Mechanical Fees
Department Category Item No. Fee Schedule Title Fee Item Description Resolution Inflator Current Fees Proposed Fees Notes Building Category II BM-01 Mechanical Fees Issuance
2021-44;2023-58;
2024-60 CPI $ 41.43 $ 42.68
Building Category II BM-02 Mechanical Fees
Installation, alteration or relocation of each refrigeration compressor or absorption unit, and for each fuel burning furnace, heater, boiler and vented decorative appliance including vents attached thereto - Up to & Including 100,000 BTU 2021-44;2023-58;
2024-60 CPI $ 40.68 $ 41.91 Plus Issuance Fee
Building Category II BM-03 Mechanical Fees
Installation, alteration or relocation of each refrigeration compressor or absorption unit, and for each fuel burning furnace, heater, boiler and vented decorative appliance including vents attached thereto - More than 100,000 BTU and up to 500,000 BTU 2021-44;2023-58;
2024-60 CPI $ 78.50 $ 80.85 Plus Issuance Fee
Building Category II BM-04 Mechanical Fees
Installation, alteration or relocation of each refrigeration compressor or absorption unit, and for each fuel burning furnace, heater, boiler and vented decorative appliance including vents attached thereto - More than 500,000 BTU 2021-44;2023-58;
2024-60 CPI $ 196.44 $ 202.33 Plus Issuance Fee
Building Category II BM-05 Mechanical Fees For each air inlet and air outlet served by any air 2021-44;2023-58;
2024-60 CPI $ 6.36 $ 6.56 Plus Issuance Fee
Building Category II BM-06 Mechanical Fees
For each air inlet and air outlet are unknown for each 1,000 square foot or fraction thereof of conditioned area
2021-44;2023-58;
2024-60 CPI $ 55.79 $ 57.46 Plus Issuance Fee
Building Category II BM-07 Mechanical Fees
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit
2021-44;2023-58;
2024-60 CPI $ 19.34 $ 19.92 Plus Issuance Fee
Building Category II BM-08 Mechanical Fees
For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto - Up to and including 2,000 CFM
2021-44;2023-58;
2024-60 CPI $ 19.34 $ 19.92 Plus Issuance Fee
Building Category II BM-09 Mechanical Fees
For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto - Each unit up to 10
2021-44;2023-58;
2024-60 CPI $ 5.99 $ 6.17 Plus Issuance Fee
Building Category II BM-10 Mechanical Fees
For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto -More than 2,000 CFM and up to and including 10,000 CFM each
2021-44;2023-58;
2024-60 CPI $ 58.41 $ 60.16 Plus Issuance Fee
Building Category II BM-11 Mechanical Fees
For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto - More than 10,000 CFM, each
2021-44;2023-58;
2024-60 CPI $ 98.22 $ 101.16 Plus Issuance Fee
Building Category II BM-12 Mechanical Fees For each evaporative cooler other than portable type 2021-44;2023-58;
2024-60 CPI $ 32.95 $ 33.94 Plus Issuance Fee
Building Category II BM-13 Mechanical Fees For ventilation fans which serve a single register - Each fan up to 10 2021-44;2023-58;
2024-60 CPI $ 24.09 $ 24.81 Plus Issuance Fee
Building Category II BM-14 Mechanical Fees For ventilation fans which serve a single register - Each fan over 10 2021-44;2023-58;
2024-60 CPI $ 8.36 $ 8.61 Plus Issuance Fee
Building Category II BM-15 Mechanical Fees
For each ventilation system which is not a portion of any air-conditioning system for which a permit is required elsewhere in this Code
2021-44;2023-58;
2024-60 CPI $ 50.79 $ 52.32 Plus Issuance Fee
Building Category II BM-16 Mechanical Fees
For the installation of each commercial kitchen hood, spray booth or product conveying duct system, including the fans and ducts attached thereto 2021-44;2023-58;
2024-60 CPI $ 98.22 $ 101.16 Plus Issuance Fee
Building Category II BM-17 Mechanical Fees For the installation of each fire damper 2021-44;2023-58;
2024-60 CPI $ 15.85 $ 16.33 Plus Issuance Fee
Building Category II BM-18 Mechanical Fees
For the alteration of an existing duct system for which a permit is not required elsewhere in this Code
2021-44;2023-58;
2024-60 CPI $ 40.68 $ 41.91 Plus Issuance Fee
Building Category II BM-19 Mechanical Fees
Investigation fee for work done without a required permit shall be equal to the permit fee but not less than
2021-44;2023-58;
2024-60 CPI $ 505.19 $ 520.35 Plus Issuance Fee
Building Category II BM-20 Mechanical Fees
Investigation fee for work done without a required permit shall be equal to the permit fee but not less than - Exemption: One or two family dwellings, when work is performed by the owner-builder
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17 Plus Issuance Fee
Building Category II BM-21 Mechanical Fees Noncompliance Fee - R-3 Occupancies 2021-44;2023-58;
2024-60 CPI $ 151.76 $ 156.31 Plus Issuance Fee
Building Category II BM-22 Mechanical Fees Noncompliance Fee - Other Occupancies 2021-44;2023-58;
2024-60 CPI $ 303.64 $ 312.75 Plus Issuance Fee
Building Category II BM-23 Mechanical Fees For investigation of alternate materials and methods of construction -For initial filing fee 2021-44;2023-58;
2024-60 CPI $ 328.47 $ 338.33 Plus Issuance Fee
Building Category II BM-24 Mechanical Fees
For investigation of alternate materials and methods of construction- For each hour or fraction thereof in excess of two
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 per hour Plus Issuance Fee
Building Category II BM-25 Mechanical Fees
The plan check fee shall be 50% of the require mechanical permit fee. EXCEPTION:
Identical Appliances of 100,000 BTW or less installed in a single building: Up to and including 10
2021-44;2023-58;
2024-60 CPI 62% Permit Fee Plus Issuance Fee
Building Category II BM-26 Mechanical Fees
The plan check fee shall be 50% of the require mechanical permit fee. EXCEPTION:
Identical Appliances of 100,000 BTW or less installed in a single building: For each appliance over 10
2021-44;2023-58;
2024-60 CPI 6%
additional of permit fee Plus
Issuance Fee
Building Category II BM-27 Mechanical Fees
If Commercial Type I or II hood are included in the work proposed, a surcharge shall be collected with a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Plus Plan Check Fee plus issuance
fee
Building Category II BM-28 Mechanical Fees
If Garage Ventilation Systems are included in the work proposed, a surcharge shall be collected with a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Plus Plan Check Fee plus issuance
fee
Building Category II BM-29 Mechanical Fees
If Stairs Pressurization Systems are included in the work proposed, a surcharge shall be collected with a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Plus Plan Check Fee plus issuance
fee
Building Category II BM-30 Mechanical Fees
If Stairs Pressurization Systems are included in the work proposed, a surcharge shall be collected with a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Plus Plan Check Fee plus issuance
fee
Building Category II BM-31 Mechanical Fees
If Product Conveying Systems are included in the work proposed, a surcharge shall be collected with a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17
Plus Plan Check Fee plus issuance
fee
Building Category II BM-32 Mechanical Fees Installation Fee - Commercial Type I or II hood 2021-44;2023-58;
2024-60 CPI $ 379.27 $ 390.65 Plus Issuance Fee
Building Category II BM-33 Mechanical Fees Installation Fee - Garage ventilation systems 2021-44;2023-58;
2024-60 CPI $ 379.27 $ 390.65 Plus Issuance Fee
Building Category II BM-34 Mechanical Fees Installation Fee - Stairs pressurization systems 2021-44;2023-58;
2024-60 CPI $ 379.27 $ 390.65 Plus Issuance Fee
Building Category II BM-35 Mechanical Fees Installation Fee - Product conveying systems 2021-44;2023-58;
2024-60 CPI $ 379.27 $ 390.65 Plus Issuance Fee
Building Category II BM-36 Mechanical Fees
Tenant improvement installations requiring review to verify compliance with the State's Energy Regulations, when a building permit is not required for that work, the fee shall be
2021-44;2023-58;
2024-60 CPI $ 40.68 $ 41.91
per 1,000 sf conditioned space plus
issuance fee
Building Category II BM-37 Mechanical Fees
Tenant improvement installations requiring review to verify compliance with the State's Energy Regulations, when a building permit is not required for that work - Minimum Fee 2021-44;2023-58;
2024-60 CPI $ 82.37 $ 84.84 Plus Issuance Fee
Building Category II BM-38 Mechanical Fees
For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors or omissions, per hour
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BM-39
General Plan
Maintenance Fee
2021-44;2023-58;
2024-60 10%
Building Permit and Planning
applications
Building Category II BM-40 Techology Fee
2021-44;2023-58;
2024-60 3%
3% Permit Fees and Planning
Applications
Plumbing Fees
Department Category Item No. Fee Schedule Title Fee Item Description Resolution Inflator Current Fees Proposed Fees Notes Building Category II BP-01 Plumbing Fees Permit Issuance 2021-44;2023-58; 2024-60 CPI $ 41.43 $ 42.68
Building Category II BP-02 Plumbing Fees For each plumbing fixture or trap or set of fixtures on one trap (including drainage vent, water piping, backflow prevention, hose Bibbs)
2021-44;2023-58;
2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-03 Plumbing Fees For each permanent type dishwasher whether individually trapped or not 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-04 Plumbing Fees For future stacks or branches, each waste inlet 2021-44;2023-58; 2024-60 CPI $ 13.35 $ 13.75 Plus Issuance Fee
Building Category II BP-05 Plumbing Fees For each roof drain 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-06 Plumbing Fees For each drainage or sewer backwater valve 2021-44;2023-58; 2024-60 CPI $ 70.26 $ 72.37 Plus Issuance Fee
Building Category II BP-07 Plumbing Fees For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps
2021-44;2023-58;
2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-08 Plumbing Fees For each swimming pool drainage trap and receptor, whether connected to a building drain or a building sewer (water supply for pool not included).
2021-44;2023-58;
2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-09 Plumbing Fees For each gas piping system on any one meter or alteration, extension or retest of existing gas piping system - Low Pressure 5 outlets or less
2021-44;2023-58;
2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-10 Plumbing Fees For each gas piping system on any one meter or alteration, extension or retest of existing gas piping system - Low Pressure each additional outlet
2021-44;2023-58;
2024-60 CPI $ 6.24 $ 6.43 Plus Issuance Fee
Building Category II BP-11 Plumbing Fees For each gas piping system on any one meter or alteration, extension or retest of existing gas piping system - Med or High pressure each system
2021-44;2023-58;
2024-60 CPI $ 100.71 $ 103.74 Plus Issuance Fee
Building Category II BP-12 Plumbing Fees For each gas piping system on any one meter or alteration, extension or retest of existing gas piping system - Med or high pressure each outlet
2021-44;2023-58;
2024-60 CPI $ 6.24 $ 6.43 Plus Issuance Fee
Building Category II BP-13 Plumbing Fees For each gas meter not under control of the service gas supplier 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-14 Plumbing Fees For each gas pressure regulator 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-15 Plumbing Fees For each water heater and/or vent 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-16 Plumbing Fees For repair or alteration of drainage and/or vent piping 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-17 Plumbing Fees For each piece of water-treating equipment 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-18 Plumbing Fees For each water pressure regulator 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-19 Plumbing Fees For potable water not covered elsewhere in fee schedule - 1 1/2 inch or smaller 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-20 Plumbing Fees For potable water not covered elsewhere in fee schedule - 2 inches to 3 inches 2021-44;2023-58; 2024-60 CPI $ 76.00 $ 78.28 Plus Issuance Fee
Building Category II BP-21 Plumbing Fees For potable water not covered elsewhere in fee schedule - Over 3 inches 2021-44;2023-58; 2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BP-22 Plumbing Fees For replacing water piping in a building, 1 each fixture 2021-44;2023-58; 2024-60 CPI $ 10.11 $ 10.41 Plus Issuance Fee
Building Category II BP-23 Plumbing Fees For sprinkling systems on any one meter, each backflow prevention device 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-24 Plumbing Fees For each backflow prevention device on unprotected water supplies, pools, tanks, vats 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-25 Plumbing Fees Each Trap Primer 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BP-26 Plumbing Fees For each potable water-heating system, including water heater and vent 2021-44;2023-58; 2024-60 CPI $ 81.87 $ 84.32 Plus Issuance Fee
Building Category II BP-27 Plumbing Fees Investigation fee for work done without a required permit shall be equal to the permit fee, but not less than
2021-44;2023-58;
2024-60 CPI $ 505.19 $ 520.35 Plus Issuance Fee
Building Category II BP-28 Plumbing Fees Investigation fee for work done without a required permit shall be equal to the permit fee, but not less than - Exception: One or two family dwellings, when work is performed by owner-builder 2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17 Plus Issuance Fee
Building Category II BP-29 Plumbing Fees Non Compliance Fee R-3 Occupancies 2021-44;2023-58; 2024-60 CPI $ 151.76 $ 156.31 Plus Issuance Fee
Building Category II BP-30 Plumbing Fees Non Compliance Fee other occupancies 2021-44;2023-58; 2024-60 CPI $ 303.64 $ 312.75 Plus Issuance Fee
Building Category II BP-31 Plumbing Fees For investigation of alternate materials and methods of construction - Initial Fee 2021-44;2023-58; 2024-60 CPI $ 328.47 $ 338.33 Plus Issuance Fee
Building Category II BP-32 Plumbing Fees For investigation of alternate materials and methods of construction - For each hour or fraction thereof, in excess of two
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 per hour plus issuance fee Building Category II BP-33 Plumbing Fees For connection of a house to the public sewer or for the extension of a house lateral onto a lot for future use
2021-44;2023-58;
2024-60 CPI $ 70.26 $ 72.37 Plus Issuance Fee
Building Category II BP-34 Plumbing Fees For each house sewer manhole 2021-44;2023-58; 2024-60 CPI $ 70.26 $ 72.37 Plus Issuance Fee
Building Category II BP-35 Plumbing Fees For each installation of a section of house sewer for future use 2021-44;2023-58; 2024-60 CPI $ 45.43 $ 46.79 Plus Issuance Fee
Building Category II BP-36 Plumbing Fees for the connection of each additional building or additional work to a house sewer 2021-44;2023-58; 2024-60 CPI $ 45.43 $ 46.79 Plus Issuance Fee
Building Category II BP-37 Plumbing Fees For connection of a house sewer to a private sewage disposal system 2021-44;2023-58; 2024-60 CPI $ 45.43 $ 46.79 Plus Issuance Fee
Building Category II BP-38 Plumbing Fees For each private sewage disposal system (septic tank, seepage pits or drain field) 2021-44;2023-58; 2024-60 CPI $ 144.39 $ 148.73 Plus Issuance Fee
Building Category II BP-39 Plumbing Fees For each grey water system (storage tank and disposal/irrigation fields) 2021-44;2023-58; 2024-60 CPI $ 144.39 $ 148.73 Plus Issuance Fee
Building Category II BP-40 Plumbing Fees For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drain field extension or replacement
2021-44;2023-58;
2024-60 CPI $ 70.26 $ 72.37 Plus Issuance Fee
Building Category II BP-41 Plumbing Fees For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system
2021-44;2023-58;
2024-60 CPI $ 45.43 $ 46.79 Plus Issuance Fee
Building
Category II
BP-42 Plumbing Fees
A plan checking fee as indicated shall be paid to the Chief Plumbing Inspector at the time of submitting plans and specifications for work described in this subsection. Said fee shall be equal to 40% of the required plumbing permit fee as set forth in Table I of this Article. 2021-44;2023-58;
2024-60 CPI
50% 51% Plus Issuance Fee
Building Category II BP-43 Plumbing Fees A surcharge added if Combination Waste and Vent System is included in the work Adoptedwith a minimum plan check fee
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17 Plus Issuance Fee
Building Category II BP-44 Plumbing Fees A surcharge added if Gas System containing an earthquake actuated shut off valve is included in the work proposed
2021-44;2023-58;
2024-60 CPI $ 88.23 $ 90.88 Plus Issuance Fee
Building Category II BP-45 Plumbing Fees A surcharge added if Chemical Waste System is included in the work proposed 2021-44;2023-58; 2024-60 CPI $ 50.29 $ 51.80 Plus Issuance Fee
Building Category II BP-46 Plumbing Fees A surcharge added if Rainwater System is included in the work proposed 2021-44;2023-58; 2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BP-47 Plumbing Fees A minimum plan check fee to be included with the surcharge 2021-44;2023-58; 2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BP-48 Plumbing Fees For plan checking individual systems not required to be reviewed under subsection (a) above - Combination waste and vent system
2021-44;2023-58;
2024-60 CPI $ 379.27 $ 390.65 Plus Issuance Fee
Building Category II BP-49 Plumbing Fees For plan checking individual systems not required to be reviewed under subsection (a) above - Gas system containing an earthquake actuated shut off valve 2021-44;2023-58;
2024-60 CPI $ 126.17 $ 129.96 Plus Issuance Fee
Building Category II BP-50 Plumbing Fees For plan checking individual systems not required to be reviewed under subsection (a) above - Chemical waste system
2021-44;2023-58;
2024-60 CPI $ 76.00 $ 78.28 Plus Issuance Fee
Building Category II BP-51 Plumbing Fees For plan checking individual systems not required to be reviewed under subsection (a) above - Rainwater system
2021-44;2023-58;
2024-60 CPI $ 252.60 $ 260.17 Plus Issuance Fee
Building Category II BP-52 Plumbing Fees For plan checking individual systems not required to be reviewed under subsection (a) above - Grey water system
2021-44;2023-58;
2024-60 CPI $ 144.39 $ 148.73 Plus Issuance Fee
Building Category II BP-53 Plumbing Fees For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors or omissions, per hour 2021-44;2023-58; 2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BP-54 General Plan
Maintenance Fee
2021-44;2023-58;
2024-60 10%
Building Permit and
Planning applications
Building Category II BP-55 Techology Fee 2021-44;2023-58; 2024-60 3%
3% Permit Fees and
Planning Applications
Electrical Fees
Department Category Item No. Fee Schedule TitleFee Item Description Resolution Inflator Current Fees Proposed Fees Notes Building Category II BE-01 Electrical Issuance Fee 2021-44;2023-58; 2024-60 CPI $ 41.43 $ 42.68
Building
Category II
BE-02 Electrical
For new multifamily residential buildings (apartments and condominiums) having three (3) or more living units not including garages, carports, and other noncommercial automobiles storage areas constructed at the same time
2021-44;2023-58;
2024-60 CPI
$ 0.12 $ 0.13
per square foot +
Issuance Fee
Building Category II BE-03 Electrical For new single and two-family residential buildings not including garages, carports and other minor accessory buildings constructed at the same time
2021-44;2023-58;
2024-60 CPI $ 0.25 $ 0.26
per square foot +
Issuance Fee
Building
Category II
BE-04 Electrical
Private Swimming Pools: For new private, residential, inground swimming pools for single, or multifamily occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool
2021-44;2023-58;
2024-60
CPI
$ 121.68 $ 125.33 Plus Issuance Fee
Building Category II BE-05 Electrical For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools
2021-44;2023-58;
2024-60 CPI $ 81.87 $ 84.32 Plus Issuance Fee
Building Category II BE-06 Electrical Carnivals and Circuses: For electric generators and electrically driven rides 2021-44;2023-58; 2024-60 CPI $ 58.41 $ 60.16 Plus Issuance Fee
Building Category II BE-07 Electrical Carnivals and Circuses: For mechanically driven rides and walk-through attractions or displays having electric lighting
2021-44;2023-58;
2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BE-08 Electrical For a system of area and booth lighting 2021-44;2023-58; 2024-60 CPI $ 24.46 $ 25.19 Plus Issuance Fee
Building Category II BE-09 Electrical For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances
2021-44;2023-58;
2024-60 CPI $ 65.40 $ 67.36 Plus Issuance Fee
Building
Category II
BE-10 Electrical For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc. 2021-44;2023-58;
2024-60 CPI
$ 32.07 $ 33.04 Plus Issuance Fee
Building
Category II
BE-11 Electrical
Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets - For 15-20 amps, 120 volt - First 10 branch circuits
2021-44;2023-58;
2024-60 CPI
$ 25.96 $ 26.74 Plus Issuance Fee
Building
Category II
BE-12 Electrical
Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets - For 15-20 amps, 120 volt - Each additional circuit from 11 to 40
2021-44;2023-58;
2024-60 CPI
$ 21.59 $ 22.24 Plus Issuance Fee
Building
Category II
BE-13 Electrical Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets - For 15-20 amps, 120 volt - over 40 2021-44;2023-58;
2024-60 CPI
$ 19.34 $ 19.92 Plus Issuance Fee
Building
Category II
BE-14 Electrical Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets - For 15-20 ampere, 208-277 volt 2021-44;2023-58;
2024-60 CPI
$ 40.93 $ 42.16 Plus Issuance Fee
Building
Category II
BE-15 Electrical Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets - For 15-20 ampere, 208-277 volt 2021-44;2023-58;
2024-60 CPI
$ 3.24 $ 3.34 Plus Issuance Fee
Building Category II BE-16 Electrical For receptacle, switch, lighting or other outlets at which Adopted is used or controlled except services, feeders and meters: Additional outlets over 20
2021-44;2023-58;
2024-60 CPI $ 2.12 $ 2.19 Plus Issuance Fee
Building Category II BE-17 Electrical Lighting fixtures, sockets or other lamp holding devices - First 20 2021-44;2023-58; 2024-60 CPI $ 3.24 $ 3.34 Plus Issuance Fee
Building Category II BE-18 Electrical Lighting fixtures, sockets or other lamp holding devices - Additional Fixtures over 20 2021-44;2023-58; 2024-60 CPI $ 2.12 $ 2.19 Plus Issuance Fee
Building Category II BE-19 Electrical For pole or platform mounted lighting fixtures 2021-44;2023-58; 2024-60 CPI $ 3.74 $ 3.86 Plus Issuance Fee
Building Category II BE-20 Electrical For theatrical-type lighting fixtures or assemblies 2021-44;2023-58; 2024-60 CPI $ 3.74 $ 3.86 Plus Issuance Fee
Building
Category II
BE-21 Electrical
For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens, counter-mounted cooking tops, electric ranges, self- contained room, console, or through-wall air conditioners, space heaters, food waste grinders, dishwashers, washing machines, water heaters, clothes dryers, or other motor-operated appliances, not exceeding three (3) horsepower (HP) in rating 2021-44;2023-58;
2024-60
CPI
$ 15.97 $ 16.45 Plus Issuance Fee
Building
Category II
BE-22 Electrical
For any appliance installed in a non-residential occupancy and not exceeding three (3) horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets, illuminated showcases, drinking fountains, vending machines, laundry machines, or other similar types of equipment 2021-44;2023-58;
2024-60
CPI
$ 23.21 $ 23.91 Plus Issuance Fee
Building
Category II
BE-23 Electrical
For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, with a rating of - Rating over 3 hp and not over 10 hp
2021-44;2023-58;
2024-60 CPI
$ 29.95 $ 30.85 Plus Issuance Fee
Building
Category II
BE-24 Electrical
For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, with a rating of - Rating over 10 hp and not over 50 hp
2021-44;2023-58;
2024-60 CPI
$ 69.14 $ 71.21 Plus Issuance Fee
Building
Category II
BE-25 Electrical
For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, with a rating of - Rating over 50 hp and not over 100 hp
2021-44;2023-58;
2024-60 CPI
$ 129.29 $ 133.17 Plus Issuance Fee
Building
Category II
BE-26 Electrical
For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, with a rating of - Rating over 100 hp
2021-44;2023-58;
2024-60
CPI
$ 213.66 $ 220.07 Plus Issuance Fee
Building Category II BE-27 Electrical Busways: For cable trays, trolley and plug-in type busways, each 100 feet or fraction thereof 2021-44;2023-58; 2024-60 CPI $ 39.31 $ 40.49 Plus Issuance Fee
Building Category II BE-28 Electrical For signs, outline lighting systems or marquees supplied from one branch circuit 2021-44;2023-58; 2024-60 CPI $ 58.41 $ 60.16 Plus Issuance Fee
Building Category II BE-29 Electrical For additional branch circuits within the same sign, outline lighting system or marquee 2021-44;2023-58; 2024-60 CPI $ 19.34 $ 19.92 Plus Issuance Fee
Building Category II BE-30 Electrical For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 399 amperes in rating
2021-44;2023-58;
2024-60 CPI $ 58.41 $ 60.16 Plus Issuance Fee
Building Category II BE-31 Electrical For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and 400 amperes to 1,000 amperes in rating
2021-44;2023-58;
2024-60 CPI $ 114.44 $ 117.87 Plus Issuance Fee
Building Category II BE-32 Electrical For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts or over 1000 amperes in rating
2021-44;2023-58;
2024-60 CPI $ 243.61 $ 250.92 Plus Issuance Fee
Building
Category II
BE-33 Electrical For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is here inset forth
2021-44;2023-58;
2024-60 CPI $ 98.09 $ 101.04 Plus Issuance Fee
Building Category II BE-34 Electrical For each extra inspection resulting from defective workmanship or materials 2021-44;2023-58; 2024-60 CPI $ 49.67 $ 51.16 Plus Issuance Fee
Building Category II BE-35 Electrical For inspection of electrical equipment for which no fee is herein set forth and for emergency inspections for the time consumed - For each hour, or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16
Per Half Hour Plus
Issuance Fee
Building Category II BE-36 Electrical For inspection of electrical equipment for which no fee is herein set forth and for emergency inspections for the time consumed- For each hour or fraction thereof 2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16
Per Hour Plus
Issuance Fee
Building
Category II
BE-37 Electrical
For any single hazardous location area, as defined by the provisions of Chapter 5 of the California Electrical Code, larger than 2,000 sq. ft or an aggregate area consisting of smaller hazardous location areas totaling over 2,000 sq. ft., a surcharge in addition to any other applicable fees each
2021-44;2023-58;
2024-60
CPI
$ 328.22 $ 338.07 Plus Issuance Fee
Building
Category II
BE-38 Electrical
For investigation and review of test reports from local testing laboratories, or to comply with Section 83-
3. for electrical items, apparatus, machine tools, appliances or other electrical equipment - For 1-10 Items
2021-44;2023-58;
2024-60 CPI
$ 379.27 $ 390.65 Plus Issuance Fee
Building
Category II
BE-39 Electrical
For investigation and review of test reports from local testing laboratories, or to comply with Section 83-
3. for electrical items, apparatus, machine tools, appliances or other electrical equipment - For 11-20 items
2021-44;2023-58;
2024-60 CPI
$ 758.04 $ 780.78 Plus Issuance Fee
Building
Category II
BE-40 Electrical
For investigation and review of test reports from local testing laboratories, or to comply with Section 83-
3. for electrical items, apparatus, machine tools, appliances or other electrical equipment - For 21-50 items
2021-44;2023-58;
2024-60 CPI
$ 1,137.18 $ 1,171.29 Plus Issuance Fee
Building
Category II
BE-41 Electrical
For investigation and review of test reports from local testing laboratories, or to comply with Section 83-
3. for electrical items, apparatus, machine tools, appliances or other electrical equipment - For more than 50 items
2021-44;2023-58;
2024-60 CPI
$ 1,263.85 $ 1,301.77 Plus Issuance Fee
Building
Category II
BE-42 Electrical
For investigation and review of test reports from local testing laboratories, or to comply with Section 83-
3. for electrical items, apparatus, machine tools, appliances or other electrical equipment -For high voltage switchgears, transformers or substations
2021-44;2023-58;
2024-60 CPI
$ 758.04 $ 780.78 Plus Issuance Fee
Building Category II BE-43 Electrical For investigation of alternate materials and methods of construction: Initial Filing Fee 2021-44;2023-58; 2024-60 CPI $ 328.47 $ 338.33 Plus Issuance Fee
Building Category II BE-44 Electrical For investigation of alternate materials and methods of construction: For each hour or fraction thereof, in excess of two
2021-44;2023-58;
2024-60 CPI $ 164.24 $ 169.16 Plus Issuance Fee
Building Category II BE-45 Electrical Investigation fee for work done without a required permit shall be equal to the permit fee but not less than
2021-44;2023-58;
2024-60 CPI $ 505.19 $ 520.35 Plus Issuance Fee
Building Category II BE-46 Electrical One or two family dwellings, when work is performed by owner-builder 2021-44;2023-58; 2024-60 CPI $ 252.60 $ 260.17 Plus Issuance Fee
Building Category II BE-47 Electrical Noncompliance fee for one and two family dwelling occupancies 2021-44;2023-58; 2024-60 CPI $ 151.76 $ 156.31 Plus Issuance Fee
Building Category II BE-48 Electrical Noncompliance fee for other occupancies 2021-44;2023-58; 2024-60 CPI $ 303.64 $ 312.75 Plus Issuance Fee
Building
Category II
BE-49 Electrical The fee shall be equal to seventy percent (70%) of the required electrical permit fee provided- With a minimum Fee of
2021-44;2023-58;
2024-60 CPI
$ 164.24 $ 169.16
70% of Electrical
Permit Plus Issuance
Fee
Building
Category II
BE-50 Electrical
The fee for each tenant improvement plan check (installations requiring review to verify compliance with the State's Electrical Energy Conservation requirements (Title 24), when a building plan check is not required for that work A minimum fee of
2021-44;2023-58;
2024-60 CPI
$ 82.37 $ 84.84
Per 1,000 sf Plus
Issuance Fee
Building
Category II
BE-51 Electrical
The fee for each tenant improvement plan check (installations requiring review to verify compliance with the State's Electrical Energy Conservation requirements (Title 24), when a building plan check is not required for that work shall be
2021-44;2023-58;
2024-60 CPI
$ 20.47 $ 21.08
Per 1,000 sf Plus
Issuance Fee
Building
Category II
BE-52 Electrical For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors or omissions 2021-44;2023-58;
2024-60 CPI
$ 164.24 $ 169.16
Per Hour Plus
Issuance Fee
Building Category II
BE-53 General Plan
Maintenance Fee
2021-44;2023-58;
2024-60 10%
Building Permit and
Planning applications
Building Category II
BE-54 Techology Fee 2021-44;2023-58;
2024-60 3%
3% Permit Fees and
Planning Applications
Public Works
Department Category Item No. Fee Schedule Title Fee Item Description Authority Resolution Inflator Current Fees Proposed Fees Notes Public Works Category I PW-01.00 Sewer Sewer Area Study Review LACC 20.32.250 LACC-PW Actual Cost Plus Admin Fee of 15% Initial Deposit of $3,000 required Public Works Category I PW-01.01 Sewer Plan Check Fee - Estimated Construction Value is $5,000.00 or less LACC 20.32.230 Resolution No. 2010-33 LACC-PW $1,894.00 $1,970.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.02 Sewer Plan Check Fee - Estimated Construction Value is $5,001.00, and not exceeding $20,000.00 LACC 20.32.230 Resolution No. 2010-33 LACC-PW $1,894.00 $1970 + 17.78% Excess over $5,000 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.03 Sewer Plan Check Fee - Estimated Construction Value is in excess of $20,001.00 LACC 20.32.230 Resolution No. 2010-33 LACC-PW $4,459.00 $4637 + 14.61% Excess over $20,000 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.04 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work at $600 or less LACC 20.32.120 Resolution No. 2010-33 LACC-PW $116.00 $121.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.05 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $601 to $1,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $222.00 $231.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.06 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $1,001-$1,500 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $355.00 $370.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.07 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $1,501-$2,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $499.00 $519.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.08 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $2,001-$2,500 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $634.00 $660.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.09 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $2,501-$3,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $753.00 $784.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.10 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $3,001- $3,500 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $880.00 $916.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.11 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $3,501- $4,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,005.00 $1,046.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.12 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $4,001- $4,500 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,130.00 $1,179.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.13 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $4,501- $5,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,237.00 $1,287.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.14 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $5,001- $6,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,453.00 $1,512.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.15 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $6,001- $7,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,643.00 $1,709.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.16 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $7,001- $8,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,818.00 $1,891.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.17 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $8,001- $9,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,983.00 $2,063.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.18 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $9,001- $10,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $2,134.00 $2,220.00 See LA County Department of Publc Works Land Development Division Fee Schedule
Public Works Category I PW-01.19 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $10,000-$50,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $1,854.00 $2,220.00 + an additional $158.00 for each $1,000 or fraction thereof of valuation of work in excess of $10,000 but not exceeding $50,000 See LA County Department of Publc Works Land Development Division Highway Permits Fee Schedule
Public Works Category I PW-01.20 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $50,000-$100,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $7,054.00 $2,220.00 + an additional $121.00 for each $1,000 or fraction thereof in excess of $50,000 but not exceeding $100,000
See LA County Department of Publc Works Land Development Division Highway Permits Fee Schedule
Public Works Category I PW-01.21 Sewer Sewer Construction Permit Fees - Total Valuation of Proposed Work between $100,000 LACC 20.32.120 Resolution No. 2010-33 LACC-PW $12,004.00 $2,220.00 + an additional $94.00 for each $1,000 or fraction thereof in excess of $100,000
See LA County Department of Publc Works Land Development Division Highway Permits Fee Schedule
Public Works Category I PW-01.22 Sewer Sewer Construction Permit Fees - For approved additional work but not included in the original permit LACC 20.32.230 Resolution No. 2010-33 LACC-PW $19.00 $10.00 + an additional $24.00 for each $100 or fraction thereof See LA County Department of Publc Works Land Development Division Highway Permits Fee Schedule
Public Works Category I PW-01.23 Sewer Sewer Connection Fees SDMC 14.12.030 Ordinance 780 LACC-PW $12.00 NO CHANGE per foot of frontage Public Works Category I PW-01.24 Sewer Sewer Connection Fees - Dwelling Units SDMC 14.12.030 Ordinance 780 LACC-PW $160.00 NO CHANGE per dwelling unit Public Works Category I PW-01.25 Sewer Sewer Trap Fees - Commercial and Industrial Buildings SDMC 14.12.030 Ordinance 780 LACC-PW $12.00 NO CHANGE per foot of frontage Public Works Category I PW-01.26 Sewer Sewer Trap Fees - Commercial Buildings SDMC 14.12.030 Ordinance 780 LACC-PW $50.00 NO CHANGE per trap Public Works Category I PW-01.27 Sewer Sewer Trap Fees - Industrial Buildings, 4-inch lateral SDMC 14.12.030 Ordinance 780 LACC-PW 4 inch lateral $200 for 1 to 4 traps, $50
for each in excess of four $200.00 for no more than four traps Plus $50 for each trap in excess of four Public Works Category I PW-01.28 Sewer Sewer Trap Fees - Industrial Buildings, 6-inch lateral SDMC 14.12.030 Ordinance 780 LACC-PW 6 inch lateral $1800 for the total of 1 to
4 traps, plus $75 for each additional
trap in excess of 24 $1,800.00 for no more than 24 traps Plus $75 for each trap in excess of 24 Public Works Category I PW-01.29 Sewer Sewer Trap Fees - Industrial Buildings, 8-inch lateral SDMC 14.12.030 Ordinance 780 LACC-PW Eight inch Lateral: $3600 for 1 to 48
traps plus $100 for each additional trap
in excess of 48 $3,600.00 for no more than 48 traps Plus $100 for each trap in excess of 48 Public Works Category I PW-01.30 Sewer Sewer Saddle Installation LACC 20.32.200 Resolution No. 2010-33 LACC-PW $157.00 NO CHANGE Per WYE Public Works Category I PW-01.31 Sewer Sewer Maintenance Fee - Manholes LACC 20.32.280 Resolution No. 2010-33 LACC-PW $4.17 $4.30 per month for 24 months Public Works Category II PW-02.00 Permit Fees Encroachment Permits - Application Fee GOV §66016 Resolution No. 2010-33;2023-58 CSI $110.00 $113.30 Per Application Public Works Category II PW-02.01 Permit Fees Encroachment Permits - Blanket Permit GOV §66016 Resolution No. 2010-33;2023-58 CSI $320.47 $330.08 Plus issuance fee; per item Public Works Category II PW-02.02 Permit Fees Encroachment Permits - Curb, Curb and Gutter, or Curb Drain GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.03 Permit Fees Encroachment Permits - A.C. or P.C.C. Paving GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.04 Permit Fees Encroachment Permits - Drive Approach (Commercial/Industrial) GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.05 Permit Fees Encroachment Permits - Excavation GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.06 Permit Fees Encroachment Permits - Sidewalk GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.07 Permit Fees Encroachment Permits - Utility Company, Repair cut less than 3ft by 4ft GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.08 Permit Fees Encroachment Permits - Utility Company, New Work GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item plus $2.32 per Linear Foot of Trenching/Boring
Public Works Category II PW-02.09 Permit Fees Encroachment Permits - Sewer/Storm Drain Laterals GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 Plus issuance fee; per item plus $2.32 per Linear Foot of Trenching/Boring
Public Works Category II PW-02.10 Permit Fees Encroachment Permits - Resident Inspection Fee GOV §66016 Resolution No. 2010-33 CSI $145.00 $149.35 Plus issuance fee; per item Public Works Category II PW-02.11 Permit Fees Encroachment Permits - Traffic Control GOV §66016 Resolution No. 2010-33;2023-58 CSI $467.94 $481.98 plus issuance fee; per item including initial day of inspections Public Works Category II PW-02.12 Permit Fees Encroachment Permit - Crane Plan Review GOV §66016 CSI Actual Cost of Review Time plus 15% Administrative Fee Public Works Category II PW-02.13 Permit Fees Encroachment Permits - Work Impacting Signal GOV §66016 Resolution No.2023-58 CSI $964.87 $993.82 Plus issuance fee; per item Public Works Category II PW-02.14 Permit Fees Encroachment Permits - Traffic Signal to Flashing Red Fee GOV §66016 Resolution No.2023-58 CSI $839.87 $865.07 Plus issuance fee; per item Public Works Category II PW-02.15 Permit Fees Encroachment Permits - Miscellaneous Items Not Specified GOV §66016 Resolution No.2023-58 CSI $467.94 $481.98 Plus issuance fee; per item Public Works Category II PW-02.16 Permit Fees Container Permit GOV §66016 Resolution No. 2010-33;2023-58 CSI $60.00 $61.80 Public Works Category II PW-02.17 Permit Fees Reinspection fee GOV §66016 Resolution No. 2010-33;2023-58 CSI $320.47 $330.08 Per day after initial fees Public Works Category II PW-02.18 Permit Fees Traffic Control Inspection Fee GOV §66016 Resolution No.2023-58; 2024-60 CSI $333.29 $149.35 Per day after initial fees Public Works Category II PW-02.19 Permit Fees Penalty Fees - working without a permit GOV §66016 Resolution No. 2010-33 CSI TBD 200% of Permit & Review Fees Public Works Category II PW-02.20 Permit Fees Dig Alert GOV §66016 Resolution No.2023-58 CSI 5% of Permit Costs 5% of Permit Costs of excavation costs and permit fees Public Works Category II PW-03.00 General Miscellaneous Fees Technology Fee GOV §66016 Resolution No.2023-58 CSI $0.02 $0.02 of all associated costs Public Works Category II PW-03.01 General Miscellaneous Fees Reproduction Fee GOV §66016 Resolution No.2023-58 CSI $7.80 $4.49 per sheet plus $18.92 per project Standard Sheet Size (24" by 36") Public Works Category II PW-03.02 General Miscellaneous Fees Emergency Response GOV §66016 Resolution No.2023-58 TBD Actual Cost plus 15% Admin Fee Public Works Category I PW-04.00 Bonds Faithful performance Bond GOV §66016 Resolution No. 2010-33 TBD NO CHANGE Based on Work Valuation Public Works Category I PW-04.01 Bonds Labor and Materials Bond GOV §66499.3.(b) Resolution No. 2010-33 TBD NO CHANGE Based on Work Valuation Public Works Category I PW-04.02 Bonds Survey Monuments Bond GOV §66016 Resolution No. 2010-33 $510.00 NO CHANGE Plus $151.00 per lot Public Works Category I PW-05.00 Deposits Deposit for Miscellaneous Item/Review TBD TBD TBD by Department Director Public Works Category II PW-06.00 SB1383 Bi- Annual Compliance Inspection SB1383 Bi- Annual Compliance Inspection - Industrial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $315 +15 % City
Adminastrative Fee
$324.45 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.01 SB1383 Bi- Annual Compliance Inspection SB1383 Bi- Annual Compliance Inspection - Commercial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $189 +15 % City
Adminastrative Fee
$194.67 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.02 SB1383 Bi- Annual Compliance Inspection SB1383 Bi- Annual Compliance Inspection - Follow Up Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $63 +15 % City
Adminastrative Fee
$64.89 Per Inspection, Plus 15% Administrative Fee
Inspection Cost assesed by Charles Abbot Associates
Public Works Category II PW-06.03 Stormwater Compliance Facility Inspection with Solid Waste Program Stormwater Compliance Facility Inspection with Solid Waste Program - Industrial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $378 +15 % City
Adminastrative Fee
$389.34 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.04 Stormwater Compliance Facility Inspection with Solid Waste Program Stormwater Compliance Facility Inspection with Solid Waste Program - Commercial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $252 +15 % City
Adminastrative Fee
$259.56 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.05 Stormwater Compliance Facility Inspection with Solid Waste Program Stormwater Compliance Facility Inspection with Solid Waste Program - Follow Up Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $63 +15 % City
Adminastrative Fee
$64.89 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.06 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection- Industrial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $441 +15 % City
Adminastrative Fee
$454.23 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.07 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection - Commercial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $315 +15 % City
Adminastrative Fee
$324.45 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.08 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection - Follow Up Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $126 +15 % City $129.78 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.09 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection SB1383 Facility Annual Compliance Inspection - Industrial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $315 +15 % City
Adminastrative Fee
$324.45 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.10 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection SB1383 Facility Annual Compliance Inspection - Commercial Facility Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $189 +15 % City
Adminastrative Fee
$194.67 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category II PW-06.11 Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection SB1383 Facility Annual Compliance Inspection - Follow Up Inspection State Order No. R4-2021-0105 Resolution No. 2024-58 CPI Inspection Costs $63 +15 % City
Adminastrative Fee
$64.89 Per Inspection, Plus 15% Administrative Fee Inspection Cost assesed by Charles Abbot Associates Public Works Category I PW-07.00 Engineering Fees Street Lighting Maintenance Fee (HPS 200 Watt Edison LS-1 rate): GOV §66016 Resolution No. 2010-33 LACC-PW $10.01 NO CHANGE per month for 24 months/HPS 200 Watt Edison LS-1 rate Public Works Category I PW-07.01 Engineering Fees Street Signs GOV §66016 Resolution No. 2010-33 CPI $520.00 $535.60 Per Installation Public Works Category I PW-07.02 Engineering Fees Engineering Review - After the third plan check submittal actual cost per hour GOV §66016 Resolution No. 2010-33 Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% per hour or Actual Cost Public Works Category I PW-07.03 Engineering Fees Processing easments/deeds/legals GOV §66016 Resolution No. 2010-33 Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% Deposit Required Public Works Category I PW-07.04 Engineering Fees Traffic Scoping Review and Traffic Impact Analyses Review GOV §66016 Resolution No. 2010-33 Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% (Minimum deposit $5,000) Public Works Category II PW-07.05 Engineering Fees Research GOV §66016 Resolution No. 2010-33;2023-58 CPI $53.00 $54.59 Per 30 minutes Public Works Category II PW-07.06 Engineering Fees Revison of Approved Engineering and Grading GOV §66016 Resolution No. 2010-33 CSI Actual Cost Plus Admin Fee of 15% $250 minimum plus Actual Cost of Review plus 15% Administrative Fee per revision
Public Works Category II PW-07.07 Engineering Fees Street Vacation Request GOV §66016 Resolution No.2023-58 CSI $2,990.00 $3,079.70 Public Works Category II PW-07.08 Engineering Fees Engineering Review - Hydrology Study GOV §66016 Resolution No.2023-58 CSI $2,750.00 $4,200.00 Public Works Category II PW-07.09 Engineering Fees Engineering Review - Precise Grade Plan GOV §66016 Resolution No.2023-58 CSI $3,470.00 $ 3574 Plus 2688 per sheet over 5 sheet Public Works Category II PW-07.10 Engineering Fees Assessment District GOV §66016 Resolution No.2023-58 CSI Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% Public Works Category II PW-07.11 Engineering Fees Annexation into Landscape District GOV §66016 Resolution No.2023-58; 2024-60 CSI $3,294.00 $3,392.00 Public Works Category II PW-07.12 Engineering Fees Application & Preliminary Review fee for Developments GOV §66016 CSI Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% Deposit TBD Based on Project Scope Public Works Category II PW-07.13 Engineering Fees Review of Miscellaneous items not specified otherwise GOV §66016 CSI Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% Deposit TBD Based on Project Scope Public Works Category II PW-07.14 Engineering Fees Engineering Review - Rough Grading Plan GOV §66016 Resolution No. 2023-58; 2024-60 CSI $4,450.00 $4,583.50 Plus $150.00 per lot Public Works Category II PW-07.15 Engineering Fees Engineering Review - Tentative Map GOV §66016 Resolution No. 2023-58; 2024-60 CSI $1,820.00 Actual Cost Plus Admin Fee of 15% with required $5,000 minimum deposit Plus $150.00 per lot
Public Works Category II PW-07.16 Engineering Fees Engineering Review - Revision of Tentative Map GOV §66016 Resolution No. 2023-58; 2024-60 CSI $442.00 Actual Cost plus 15% Administrative Fee Plus $200 per sheet Public Works Category II PW-07.17 Engineering Fees Engineering Review - Lot Line Adjustment GOV §66016 Resolution No. 2023-58; 2024-60 CSI $1,898.00 $1,954.94 Public Works Category II PW-07.18 Engineering Fees Traffic Study Review (VMT/LOS) GOV §66016 Resolution No. 2023-58; 2024-60 CSI $3,000.00 Actual Cost plus 15% Administrative Fee with required minimum deposit of $5,000
Public Works Category II PW-07.19 Engineering Fees Engineering Review - Lot Combination or Merger GOV §66016 Resolution No. 2023-58; 2024-60 CSI $1,697.00 $1,747.91 Public Works Category II PW-07.20 Engineering Fees Engineering Review - Final Map GOV §66016 Resolution No. 2023-58; 2024-60 CSI $4,175.00 $4300.25 Plus $123.60 per lot Plus $120 per lot Public Works Category II PW-07.21 Engineering Fees Monument Inspection GOV §66016 Resolution No. 2023-58; 2024-60 CSI Min $1,419 or $52 per monument Min $1,461.57 or $53.56 per monument Public Works Category II PW-07.22 Engineering Fees Engineering Review - Certificate of Compliance GOV §66016 Resolution No. 2023-58; 2024-60 CSI $1,541.28 Actual Cost Plus Admin Fee of 15% Public Works Category II PW-07.23 Engineering Fees Engineering Review - CC&R's GOV §66016 Resolution No. 2023-58; 2024-60 CSI $1,000.00 Actual Cost Plus Admin Fee of 15% (Minimum Deposit of $2,000.00) Public Works Category II PW-07.24 Engineering Fees Domestic Water Improvements Plan Check GOV §66016 CPI $391.00 plus 15% Administrative Fee Public Works Category I PW-07.25 Engineering Fees Plan Check Fee, including inspection based on valuation for storm drain and street - Over $50,000 value GOV §66016 Resolution No. 2010-33 Actual Cost Plus Admin Fee of 15% 6% of estimated construction cost (3% for plan check and 3% for Inspection) Public Works Category I PW-07.26 Engineering Fees Drainage/Parking Lot - No more than $10,000 value of LID improvement GOV §66016 Resolution No. 2010-33 $0.07 7% of estimated construction cost Public Works Category I PW-07.27 Engineering Fees Drainage/Parking Lot - $10,000 to $50,000 value of LID improvement GOV §66016 6%+700 6% of estimated construction cost plus $700 Public Works Category I PW-07.28 Engineering Fees Drainage/Parking Lot - Over $50,000 value of LID improvement GOV §66016 5%+$2400+$700 5% of estimated construction cost plus $2,400 plus $700 Public Works Category I PW-07.29 Engineering Fees N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Minimum Fee GOV §66016 Resolution No. 2010-33 $717.00 $739.00 Public Works Category I PW-07.30 Engineering Fees N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - $10,000 to $50,000 value of LID Improvement GOV §66016 Resolution No. 2010-33 6%+717 6% of estimated construction cost plus $739 Public Works Category I PW-07.31 Engineering Fees N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Over $50,000 value LID improvement GOV §66016 Resolution No. 2010-33 5%+$2400+$717 5% of estimated construction cost plus $2400 plus $739
Golf Course Fees
Department Category Item No. Fee Schedule Title Fee Item Description Resolution Inflator AdoptedF ees
Notes
Administration Category I GC - 01.00 San Dimas Canyon Golf Club Fees Weekday- Senior (55+) Walk Minutes 11/1/2020 $ 24.00 Administration Category I GC - 01.01 San Dimas Canyon Golf Club Fees Weekday- Senior (55+) Walk + Cart Minutes 11/1/2020 $ 60.00 Administration Category I GC - 01.02 San Dimas Canyon Golf Club Fees Weekday- Regular Walk Non Senior Minutes 11/1/2020 $ 44.00 Administration Category I GC - 01.03 San Dimas Canyon Golf Club Fees Weekday- Regular Non Senior + Cart Minutes 11/1/2020 $ 103.00 Administration Category I GC - 01.04 San Dimas Canyon Golf Club Fees Weekday- Twilight Walk Minutes 11/1/2020 $ 28.00 Administration Category I GC - 01.05 San Dimas Canyon Golf Club Fees Weekday- Twilight Walk + Cart Minutes 11/1/2020 $ 69.00 Administration Category I GC - 01.06 San Dimas Canyon Golf Club Fees Weekday- Super Twilight Walk Minutes 11/1/2020 $ 25.00 Administration Category I GC - 01.07 San Dimas Canyon Golf Club Fees Weekday- Super Twilight Walk + Cart Minutes 11/1/2020 $ 59.00 Administration Category I GC - 01.08 San Dimas Canyon Golf Club Fees Weekends- Regular Walk Minutes 11/1/2020 $ 58.00 Administration Category I GC - 01.09 San Dimas Canyon Golf Club Fees Weekends- Regular Walk + Cart Minutes 11/1/2020 $ 132.00 Administration Category I GC - 01.10 San Dimas Canyon Golf Club Fees Weekends- Twilight Walk Minutes 11/1/2020 $ 41.00 Administration Category I GC - 01.11 San Dimas Canyon Golf Club Fees Weekends- Twilight Walk + Cart Minutes 11/1/2020 $ 95.00 Administration Category I GC - 01.12 San Dimas Canyon Golf Club Fees Weekends- Super Twilight Walk Minutes 11/1/2020 $ 26.00 Administration Category I GC - 01.13 San Dimas Canyon Golf Club Fees Weekends- Super Twilight Walk + Cart Minutes 11/1/2020 $ 61.00
References
Summary of Inflation Adjustments: Abbreviation % Used Source Alliant Insurance Company AIC 5.00%
Consumer Price Index - U.S Department of Labor - Labor Statistics CPI 3.00% https://www.bls.gov/cpi/ Contracted Salary Increases CSI MOU Teamsters-San Dimas.pdf International Society of Arboriculture Guide for Plant Appraisal ISA Valuation done annually by West Coast Arborist in compliance with ISA Los Angeles County Code -Bail LACC-B misd.pdf (lacourt.org) Los Angeles County Code - PW LACC-PW Chapter 20.32 - SANITARY SEWERS | Code of Ordinances | Los Angeles County, CA | Municode Library Summary of Authorities: Abbreviation Source
Building Standards Administration Special Revolving Fund BSASDRF BSC-2 Fee Report Form (ca.gov) California Civic Code CIV Codes Display Text (ca.gov)
California Constitution Cal.Const. Codes Display Text (ca.gov) California Government Code GOV Codes: Codes Tree - Government Code - GOV (ca.gov) California Code Public Resources Code PRC https://leginfo.legislature.ca.gov/faces/codesTOCSelected.xhtml?tocCode=PRC&tocTitle=+Public+Resources+Code+-+PRC California Vehicle Code CVC UBPS_2020_Final.pdf (ca.gov) Fish and Game Code FGC Codes: Codes Tree - Fish and Game Code - FGC (ca.gov) Los Angeles County Code LACC | Code of Ordinances | Los Angeles County, CA | Municode Library San Dimas Municipal Code SDMC San Dimas Municipal Code (San Dimas, California) (qcode.us) State of California Department of Conservation DOC Fee Schedule: Strong-Motion Instrumentation and Seismic Hazard Mapping Fee (ca.gov) Authority
Fee Study Cost Allocation Plan Adopted & Approved September 26, 2023 ,
Department Fee # Fee Schedule Title Fee Item Description Current Fees Proposed Fee Increase Administration
Finance BL-05 Business License Business with employees $166.40 $171.39 $ 4.99 Finance BL-06 Business License Per employee $12.52 $12.90 $ 0.38 Finance BL-27 Business License Home Occupation $166.40 $171.39 $ 4.99 Parks & Recreation
Parks & Recreation PR-01.05 Camps Summer Camp - Kids Fun Club- Swim $2.00 $3.00 $ 1.00 Parks & Recreation PR-02.03 Community Event Food Trucks - 15Ft $110.00 $110-$200 Up to $90 Parks & Recreation PR-02.06 Community Event Hikes $5.00 $7.00 $ 2.00 Parks & Recreation PR-02.07 Community Event Parent Sweetheart Dance $12.00 $15.00 $ 3.00 Parks & Recreation PR-02.08 Community Event Vendor Charge 10x10 Space $40-$100 $50-$200 $10-$100 Parks & Recreation PR-03.00 Excursions Excursion - Day Trip $15-100 $20-200 $5-$100 Parks & Recreation PR-03.01 Excursions Excursion - Overnight (2+ days) $135-600 $175-$600 Up to $40 Parks & Recreation PR-03.02 Excursions Excursion - Overnight Trip $175-245 $175-$300 Up to $55 Parks & Recreation PR-03.03 Excursions Spring Camp - Kids Fun Club - Trip $45.00 $15-$100 Up to $55 Parks & Recreation PR-03.04 Excursions Summer Camp - Kids Fun Club- Trips $35.00 $15-$100 Up to $65 Parks & Recreation PR-03.05 Excursions Summer Camp- Teen City - Trip $30.00 $15-$100 Up to $70 Parks & Recreation PR-03.06 Excursions Winter Camp - Kids Fun Club - Trip $46.00 $15-$100 Up to $54 Parks & Recreation FAC-01.00 Facility Rental Fees Community Building - Full - Resident $150.00 $165.00 $ 15.00 Parks & Recreation FAC-01.01 Facility Rental Fees Community Building - Full - Not For Profit $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.02 Facility Rental Fees Community Building - Full - Non Resident $200.00 $220.00 $ 20.00 Parks & Recreation FAC-01.04 Facility Rental Fees Community Building - Front Half- Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.05 Facility Rental Fees Community Building - Front Half- Not For Profit $100.00 $110.00 $ 10.00 Parks & Recreation FAC-01.07 Facility Rental Fees Community Building - Front Half- Non Resident $150.00 $165.00 $ 15.00 Parks & Recreation FAC-01.08 Facility Rental Fees Community Building - Front Third - Resident $100.00 $110.00 $ 10.00 Parks & Recreation FAC-01.10 Facility Rental Fees Community Building - Front Third- Not For Profit $55.00 $60.00 $ 5.00 Parks & Recreation FAC-01.107 Facility Rental Fees Walker House- Conference Room (8:00am - 10:00pm) - Not for Profit $40.00 $50.00 $ 10.00 Parks & Recreation FAC-01.108 Facility Rental Fees Walker House- Conference Room (8:00am - 10:00pm) - Resident $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.11 Facility Rental Fees Community Building - Front Third- Non Resident $150.00 $165.00 $ 15.00 Parks & Recreation FAC-01.110 Facility Rental Fees Walker House- Conference Room (8:00am - 10:00pm) - Non Resident $65.00 $70.00 $ 5.00 Parks & Recreation FAC-01.12 Facility Rental Fees Community Building - Back - Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.14 Facility Rental Fees Community Building - Back - Not for Profit $100.00 $110.00 $ 10.00 Parks & Recreation FAC-01.15 Facility Rental Fees Community Building - Back - Non Resident $150.00 $165.00 $ 15.00 Parks & Recreation FAC-01.16 Facility Rental Fees Community Building -Rear North- Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.18 Facility Rental Fees Community Building -Rear North- Not for Profit $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.19 Facility Rental Fees Community Building -Rear North- Non Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.20 Facility Rental Fees Community Building -Rear North + South- Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.22 Facility Rental Fees Community Building -Rear North + South- Not for Profit $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.23 Facility Rental Fees Community Building -Rear North + South- Non Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.24 Facility Rental Fees Community Building -Rear South + Meeting - Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.26 Facility Rental Fees Community Building -Rear South + Meeting - Not for Profit $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.27 Facility Rental Fees Community Building -Rear South + Meeting - Non Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.28 Facility Rental Fees Community Building -Rear North + Meeting - Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.30 Facility Rental Fees Community Building -Rear North + Meeting - Not for Profit $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.31 Facility Rental Fees Community Building -Rear North + Meeting - Non Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.32 Facility Rental Fees Community Building- Meeting Room - Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.34 Facility Rental Fees Community Building- Meeting Room - Not for Profit $60.00 $66.00 $ 6.00 Parks & Recreation FAC-01.35 Facility Rental Fees Community Building- Meeting Room - Non Resident $100.00 $110.00 $ 10.00 Parks & Recreation FAC-01.36 Facility Rental Fees Community Building- Plaza - Non Resident $100.00 $110.00 $ 10.00 Parks & Recreation FAC-01.37 Facility Rental Fees Community Building- Plaza - Resident $50.00 $55.00 $ 5.00 Parks & Recreation FAC-01.38 Facility Rental Fees Senior Citizen/ Community Center - Multipurpose Room - Resident $125.00 $140.00 $ 15.00 Parks & Recreation FAC-01.40 Facility Rental Fees Senior Citizen/ Community Center - Multipurpose Room - Not for Profit $85.00 $95.00 $ 10.00 Parks & Recreation FAC-01.41 Facility Rental Fees Senior Citizen/ Community Center - Multipurpose Room - Non Resident $150.00 $165.00 $ 15.00 Parks & Recreation FAC-01.42 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekday - Resident $20.00 $25.00 $ 5.00
Parks & Recreation FAC-01.44 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekday - Not For Profit $15.00 $20.00 $ 5.00
Parks & Recreation FAC-01.45 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekday - Non Resident $40.00 $45.00 $ 5.00
Parks & Recreation FAC-01.46 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekend - Resident $55.00 $60.00 $ 5.00
Parks & Recreation FAC-01.48 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekend - Not For Profit $30.00 $35.00 $ 5.00
Parks & Recreation FAC-01.49 Facility Rental Fees
Senior Citizen/ Community Center - Meeting Room - Weekend - Non Resident $100.00 $110.00 $ 10.00
Parks & Recreation FAC-01.50 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekday - Resident $20.00 $25.00 $ 5.00
Parks & Recreation FAC-01.52 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekday - Not For Profit $15.00 $20.00 $ 5.00
Parks & Recreation FAC-01.53 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekday - Non Resident $35.00 $40.00 $ 5.00
Parks & Recreation FAC-01.54 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekend - Resident $55.00 $60.00 $ 5.00
Parks & Recreation FAC-01.56 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekend - Not For Profit $30.00 $35.00 $ 5.00
Parks & Recreation FAC-01.57 Facility Rental Fees
Senior Citizen/ Community Center - Conference Room- Weekend - Non Resident $100.00 $110.00 $ 10.00
Parks & Recreation FAC-01.58 Facility Rental Fees Ladera Serra & Merchant Park - Resident $75.00 $85.00 $ 10.00 Parks & Recreation FAC-01.60 Facility Rental Fees Ladera Serra & Merchant Park - Not For Profit $50.00 $55.00 $ 5.00
SUMMARY OF PROPOSED CHANGES & ADDITIONS
Parks & Recreation FAC-01.61 Facility Rental Fees Ladera Serra & Merchant Park - LSP Restroom Key Only $45.00 $50.00 $ 5.00 Parks & Recreation RC-01 Recreation Center Memberships - Annual Pass - Individual - Resident $230.00 $255.00 $ 25.00 Parks & Recreation RC-02 Recreation Center Memberships - Annual Pass - Individual - Non Resident $265.00 $290.00 $ 25.00 Parks & Recreation RC-03 Recreation Center
Memberships - Annual Pass - Individual - Resident - Purchased July 1 - August 31 $200.00 $220.00 $ 20.00
Parks & Recreation RC-04 Recreation Center
Memberships - Annual Pass - Individual - Non Resident - Purchased July 1 - August 31 $230.00 $255.00 $ 25.00
Parks & Recreation RC-05 Recreation Center Memberships - Annual Pass - Family - Resident $395.00 $435.00 $ 40.00 Parks & Recreation RC-06 Recreation Center Memberships - Annual Pass - Family - Non Resident $420.00 $460.00 $ 40.00 Parks & Recreation RC-07 Recreation Center
Memberships - Annual Pass - Family - Resident - Purchased July 1 - August 31 $340.00 $375.00 $ 35.00
Parks & Recreation RC-08 Recreation Center
Memberships - Annual Pass - Family - Non Resident - Purchased July 1 - August 31 $360.00 $395.00 $ 35.00
Parks & Recreation RC-09 Recreation Center Memberships - Recreation Swim Season Pass- Individual - Resident $35.00 $40.00 $ 5.00 Parks & Recreation RC-10 Recreation Center
Memberships - Recreation Swim Season Pass- Individual - Non Resident $45.00 $50.00 $ 5.00
Parks & Recreation RC-11 Recreation Center Memberships - Recreation Swim Season Pass- Family - Resident $55.00 $60.00 $ 5.00 Parks & Recreation RC-12 Recreation Center Memberships -Recreation Swim Season Pass- Family - Non Resident $65.00 $70.00 $ 5.00 Parks & Recreation RC-13 Recreation Center Memberships - Monthly Pass - Resident $35.00 $40.00 $ 5.00 Parks & Recreation RC-14 Recreation Center Memberships - Monthly Pass - Non Resident $45.00 $50.00 $ 5.00 Parks & Recreation RC-15 Recreation Center Memberships - Monthly Pass - Senior & Student Rate $27.00 $30.00 $ 3.00 Parks & Recreation RC-16 Recreation Center Memberships - Entrance Fee- Resident $5.00 $8.00 $ 3.00 Parks & Recreation RC-17 Recreation Center Memberships - Entrance Fee- Non Resident $7.00 $10.00 $ 3.00 Parks & Recreation RC-18 Recreation Center Memberships - Entrance Fee- Senior & Student Rate $2.00 $5.00 $ 3.00 Parks & Recreation RC-19 Recreation Center Memberships - Entrance Fee- Recreation Swim- Senior $2.00 $5.00 $ 3.00 Parks & Recreation RC-20 Recreation Center Memberships - Entrance Fee- Recreation Swim- Adult $3.00 $5.00 $ 2.00 Parks & Recreation RC-21 Recreation Center Memberships - Daily- Recreation Swim- Child (17 & Under) $2.00 $5.00 $ 3.00 Parks & Recreation RC-22 Recreation Center Rental Fees - Recreation Center Competition Pool $160.00 $175.00 $ 15.00 Parks & Recreation RC-23 Recreation Center Rental Fees - Recreation Center Training Pool $160.00 $175.00 $ 15.00 Parks & Recreation RC-24 Recreation Center Rental Fees - Recreation Center Both Pools $320.00 $350.00 $ 30.00 Parks & Recreation PR-04.11 Recreation Classes Shooting Stars - Monthly Rate $45.00 $50.00 $ 5.00 Parks & Recreation PR-04.12 Recreation Classes Shooting Stars - Special Team $6.00 $7.00 $ 1.00 Parks & Recreation PR-04.16 Recreation Classes Swim - Group $55.00 $80.00 $ 25.00 Parks & Recreation PR-04.17 Recreation Classes Swim - Private $126.00 $180.00 $ 54.00 Parks & Recreation PR-04.21 Recreation Classes Tiny Tots - Twice Per Week $135.00 $150.00 $ 15.00 Parks & Recreation PR-04.23 Recreation Classes Tiny Tots- Friday Additional Day $110.00 $121.00 $ 11.00 Parks & Recreation FAC-01.165 Rental Fees Kitchen Fee $0.00 $50.00 $ 50.00 Parks & Recreation FAC-01.164 Rental Fees Cleaning Fee $0.00 $100.00 $ 100.00 Parks & Recreation FAC-01.166 Rental Fees A/V Equipment use $0.00 $100.00 $ 100.00 Parks & Recreation FAC-01.167 Rental Fees Park Shelter Fees ( Marchant, Pioneer &Horsethief Canyon) - Resident $0.00 $100.00 $ 100.00 Parks & Recreation FAC-01.168 Rental Fees
Park Shelter Fees ( Marchant, Pioneer &Horsethief Canyon) - Non Resident $0.00 $125.00 $ 125.00
Parks & Recreation PR-05.00 Senior Services Bunko $5.00 $8.00 $ 3.00 Parks & Recreation PR-05.02 Senior Services Meals - Dinner fee $10.00 $12.00 $ 2.00 Parks & Recreation PR-05.03 Senior Services Meals - Holiday $12.00 $15.00 $ 3.00 Parks & Recreation PR-05.04 Runnin Scared Event Preregistration 5k $25.00 $30.00 $ 5.00 Parks & Recreation PR-05.05 Runnin Scared Event Preregistration /group 5k (20+) $20.00 $25.00 $ 5.00 Parks & Recreation PR-05.06 Runnin Scared Event Preregistraiton 1 Mile Fun Run $15.00 $20.00 $ 5.00 Parks & Recreation PR-05.07 Runnin Scared Event Preregistration Fun Run Group $10.00 $15.00 $ 5.00 Parks & Recreation PR-05.08 Runnin Scared Event Preregestraion Toddler Trot $9.00 $12.00 $ 3.00 Parks & Recreation PR-05.09 Runnin Scared Event Toddler Trot (day of) $12.00 $15.00 $ 3.00 Parks & Recreation PR-05.10 Runnin Scared Event 1 Mile Fun Run (day of) registration $25.00 $30.00 $ 5.00 Parks & Recreation PR-05.10 Runnin Scared Event 5k (day of) registration $35.00 $40.00 $ 5.00 Parks & Recreation PR-06.01 Youth Sports Basketball $55.00 $60.00 $ 5.00 Parks & Recreation PR-06.02 Youth Sports Football MM $55.00 $60.00 $ 5.00 Parks & Recreation PR-06.03 Youth Sports Soccer MM $55.00 $60.00 $ 5.00 Parks & Recreation PR-06.04 Youth Sports T-Ball MM $55.00 $60.00 $ 5.00 Public Works
Public Works PW-01.00 Sewer Sewer Area Study Review $0.00 Actual Cost of Review Time
Plus 15% Admin Fee N/A
Public Works PW-01.31 Sewer Sewer Maintenance Fee - Manholes $4.17 $4.30 $ 0.13 Public Works PW-02.00 Permit Fees Encroachment Permits - Application Fee $110.00 $113.30 $ 3.30 Public Works PW-02.01 Permit Fees Encroachment Permits - Blanket Permit $320.47 $330.08 $ 9.61 Public Works PW-02.02 Permit Fees Encroachment Permits - Curb, Curb and Gutter, or Curb Drain $467.94 $481.98 $ 14.04 Public Works PW-02.03 Permit Fees Encroachment Permits - A.C. or P.C.C. Paving $467.94 $481.98 $ 14.04 Public Works PW-02.04 Permit Fees Encroachment Permits - Drive Approach (Commercial/Industrial) $467.94 $481.98 $ 14.04 Public Works PW-02.05 Permit Fees Encroachment Permits - Excavation $467.94 $481.98 $ 14.04 Public Works PW-02.06 Permit Fees Encroachment Permits - Sidewalk $467.94 $481.98 $ 14.04 Public Works PW-02.07 Permit Fees Encroachment Permits - Utility Company, Repair cut less than 3ft by 4ft $467.94 $481.98 $ 14.04 Public Works PW-02.08 Permit Fees Encroachment Permits - Utility Company, New Work $467.94 $481.98 $ 14.04 Public Works PW-02.09 Permit Fees Encroachment Permits - Sewer/Storm Drain Laterals $467.94 $481.98 $ 14.04 Public Works PW-02.10 Permit Fees Encroachment Permits - Resident Inspection Fee $145.00 $149.35 $ 4.35 Public Works PW-02.11 Permit Fees Encroachment Permits - Traffic Control $467.94 $481.98 $ 14.04 Public Works PW-02.12 Permit Fees Encroachment Permit - Crane Plan Review $0.00 Actual Cost of Review Time
Plus 15% Admin Fee N/A
Public Works PW-02.13 Permit Fees Encroachment Permits - Work Impacting Signal $964.87 $993.82 $ 28.95 Public Works PW-02.14 Permit Fees Encroachment Permits - Traffic Signal to Flashing Red Fee $839.87 $865.07 $ 25.20 Public Works PW-02.15 Permit Fees Encroachment Permits - Miscellaneous Items Not Specified $467.94 $481.98 $ 14.04 Public Works PW-02.16 Permit Fees Container Permit $60.00 $61.80 $ 1.80 Public Works PW-02.17 Permit Fees Reinspection fee $320.47 $330.08 $ 9.61 Public Works PW-02.18 Permit Fees Traffic Control Inspection Fee $333.29 $149.35 $ (183.94) Public Works PW-02.19 Permit Fees Penalty Fees - working without a permit TBD 200% of Permit & Review Fees N/A Public Works PW-03.01
General Miscellaneous
Fees Reproduction Fee $7.80
$4.49 per sheet plus $18.92
per project Starting at $15.61
Public Works PW-03.02
General Miscellaneous
Fees Emergency Response TBD
Actual Cost plus 15% Admin
Fee N/A
Public Works PW-07.01 Engineering Fees Street Signs $520.00 $536.00 $ 16.00 Public Works PW-07.04 Engineering Fees Traffic Scoping Review and Traffic Impact Analyses Review Actual Cost Plus Admin Fee of 15% Actual Cost Plus Admin Fee of 15% (Minimum deposit $5,000) $ - Public Works PW-07.05 Engineering Fees Research $53.00 $54.59 $ 1.59 Public Works PW-07.06 Engineering Fees Revison of Approved Engineering and Grading Actual Cost Plus Admin Fee
of 15%
$250 minimum plus Actual Cost
of Review plus 15%
Administrative Fee Up to $250
Public Works PW-07.07 Engineering Fees Street Vacation Request $2,990.00 $3,079.70 $ 89.70 Public Works PW-07.08 Engineering Fees Engineering Review - Hydrology Study $2,750.00 $4,200.00 $ 1,450.00 Public Works PW-07.09 Engineering Fees Engineering Review - Precise Grade Plan $3,470.00 $ 3574 Plus 3574 per every 5
sheets thereof $ 104.00
Public Works PW-07.11 Engineering Fees Annexation into Landscape District $3,294.00 $3,392.00 $ 98.00 Public Works PW-07.14 Engineering Fees Engineering Review - Rough Grading Plan $4,450.00 $4,583.50 $ 133.50 Public Works PW-07.15 Engineering Fees Engineering Review - Tentative Map $1,820.00 Actual Cost Plus Admin Fee of
15% with required $5,000
minimum deposit Starting $3,180
Public Works PW-07.16 Engineering Fees Engineering Review - Revision of Tentative Map $442.00 Actual Cost plus 15%
Administrative Fee
Public Works PW-07.17 Engineering Fees Engineering Review - Lot Line Adjustment $1,898.00 $1,954.94 $ 56.94 Public Works PW-07.18 Engineering Fees Traffic Study Review (VMT/LOS) $3,000.00 Actual Cost plus 15%
Administrative Fee with
required minimum deposit of
$5,000 Starting at $2,000
Public Works PW-07.19 Engineering Fees Engineering Review - Lot Combination or Merger $1,697.00 $1,747.91 $ 50.91 Public Works PW-07.20 Engineering Fees Engineering Review - Final Map $4,175.00 $4300.25 Plus $123.60 per lot Starting at
$125.25
Public Works PW-07.21 Engineering Fees Monument Inspection Min $1,419 or $52 per
monument
Min $1,461.57 or $53.56 per
monument Starting at $44.13
Public Works PW-07.22 Engineering Fees Engineering Review - Certificate of Compliance $1,541.28 Actual Cost Plus Admin Fee of
15% N/A
Public Works PW-07.23 Engineering Fees Engineering Review - CC&R's $1,000.00 Actual Cost Plus Admin Fee of
15% N/A
Public Works PW-07.24 Engineering Fees Domestic Water Improvements Plan Check $0.00 $391 Plus Admin Fee of 15% N/A Public Works PW-07.25 Engineering Fees
Plan Check Fee, including inspection based on valuation for storm drain and street - Over $50,000 value
Actual Cost Plus Admin Fee
of 15%
6% of estimated construction
cost N/A
Public Works PW-07.29 Engineering Fees N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Minimum Fee $717.00 $739.00 $ 22.00 Public Works PW-07.30 Engineering Fees
N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - $10,000 to $50,000 value of LID Improvement 6%+717
6% of estimated construction
cost plus $739 $ 22.00
Public Works PW-07.31 Engineering Fees
N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Over $50,000 value LID improvement 5%+$2400+$717
5% of estimated construction
cost plus $2400 plus $739 $ 22.00
Public Works PW-08.00 Special Events Special Event Application $3,647.00 $3,756.41 $ 109.41 Public Works PW-06.07
Stormwater Compliance
Facility Inspection with
SB1383 Compliance
Inspection
Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection - Commercial Facility Inspection
Inspection Costs $315 +15
% City Adminastrative Fee
$324.45 Per Inspection, Plus
15% Administrative Fee $ 9.45
Public Works PW-06.08
Stormwater Compliance
Facility Inspection with
SB1383 Compliance
Inspection
Stormwater Compliance Facility Inspection with SB1383 Compliance Inspection - Follow Up Inspection
Inspection Costs $126 +15
% City Adminastrative Fee
$129.78 Per Inspection, Plus
15% Administrative Fee $ 3.78
Public Works PW-06.09
Stormwater Compliance
Facility Inspection with
SB1383 Compliance
Inspection
SB1383 Facility Annual Compliance Inspection - Industrial Facility Inspection
Inspection Costs $315 +15
% City Adminastrative Fee
$324.45 Per Inspection, Plus
15% Administrative Fee $ 9.45
Public Works PW-06.10
Stormwater Compliance
Facility Inspection with
SB1383 Compliance
Inspection
SB1383 Facility Annual Compliance Inspection - Commercial Facility Inspection
Inspection Costs $189 +15
% City Adminastrative Fee
$194.67 Per Inspection, Plus
15% Administrative Fee $ 5.67
Public Works PW-06.11
Stormwater Compliance
Facility Inspection with
SB1383 Compliance
Inspection SB1383 Facility Annual Compliance Inspection - Follow Up Inspection Inspection Costs $63 +15 %
City Adminastrative Fee
$64.89 Per Inspection, Plus
15% Administrative Fee $ 1.89
Public Works PW-07.01 Engineering Fees Street Signs $520.00 $536.00 $ 16.00 Public Works PW-07.04 Engineering Fees Traffic Scoping Review and Traffic Impact Analyses Review Actual Cost Plus Admin Fee
of 15%
Actual Cost Plus Admin Fee of
15% (Minimum deposit $5,000)
Public Works PW-07.05 Engineering Fees Research $53.00 $54.59 $ 1.59 Public Works PW-07.06 Engineering Fees Revison of Approved Engineering and Grading Actual Cost Plus Admin Fee
of 15%
$250 minimum plus Actual Cost
of Review plus 15%
Administrative Fee $ 250.00
Public Works PW-07.07 Engineering Fees Street Vacation Request $2,990.00 $3,079.70 $ 89.70 Public Works PW-07.08 Engineering Fees Engineering Review - Hydrology Study $2,750.00 $4,200.00 $ 1,450.00 Public Works PW-07.09 Engineering Fees Engineering Review - Precise Grade Plan $3,470.00 $ 3,574 Plus $2,688 per sheet
over 5 sheet
Public Works PW-07.11 Engineering Fees Annexation into Landscape District $3,294.00 $3,392.00 $ 98.00 Public Works PW-07.14 Engineering Fees Engineering Review - Rough Grading Plan $4,450.00 $4,583.50 $ 133.50 Public Works PW-07.15 Engineering Fees Engineering Review - Tentative Map $1,820.00 Actual Cost Plus Admin Fee of
15% with required $5,000
minimum deposit $ 3,180.00
Public Works PW-07.16 Engineering Fees Engineering Review - Revision of Tentative Map $442.00 Actual Cost plus 15%
Administrative Fee
Public Works PW-07.17 Engineering Fees Engineering Review - Lot Line Adjustment $1,898.00 $1,954.94 $ 56.94 Public Works PW-07.18 Engineering Fees Traffic Study Review (VMT/LOS) $3,000.00 Actual Cost plus 15%
Administrative Fee with
required minimum deposit of
$5,000 $ 2,000.00
Public Works PW-07.19 Engineering Fees Engineering Review - Lot Combination or Merger $1,697.00 $1,747.91 $ 50.91
Public Works PW-07.20 Engineering Fees Engineering Review - Final Map $4,175.00 $4300.25 Plus $123.60 per lot $ 248.85 Public Works PW-07.21 Engineering Fees Monument Inspection Min $1,419 or $52 per
monument
Min $1,461.57 or $53.56 per
monument $ 44.13
Public Works PW-07.22 Engineering Fees Engineering Review - Certificate of Compliance $1,541.28 Actual Cost Plus Admin Fee of
15% N/A
Public Works PW-07.23 Engineering Fees Engineering Review - CC&R's $1,000.00 Actual Cost Plus Admin Fee of
15% Minimum Deposit of
$2,000.00 N/A
Public Works PW-07.25 Engineering Fees
Plan Check Fee, including inspection based on valuation for storm drain and street - Over $50,000 value
Actual Cost Plus Admin Fee
of 15%
6% of estimated construction
cost N/A
Public Works PW-07.29 Engineering Fees N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Minimum Fee $717.00 $739.00 $ 22.00 Public Works PW-07.30 Engineering Fees
N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - $10,000 to $50,000 value of LID Improvement 6%+717
6% of estimated construction
cost plus $739 $ 22.00
Public Works PW-07.31 Engineering Fees
N.P.D.E.S - S.U.S.M.P/S.W.P.P.P - Over $50,000 value LID improvement 5%+$2400+$717
5% of estimated construction
cost plus $2400 plus $739 $ 22.00
Public Works PW-08.00 Special Events Special Event Application $3,647.00 $3,756.41 $ 109.41 Community Development
Parking Veh-77 Parking Fees & Rates Parking within 20' of a Crosswalk $0.00 $77.00 $ 77.00 Parking Veh-78 Parking Fees & Rates Parking in a Red Curb $0.00 $66.00 $ 66.00 Building BB-75 Additional Building Fees Plan Check/Permit Extensions $0.00 $130.00 $ 130.00 Building BB-76 Additional Building Fees Plan Check/Permit Renewals $0.00 $190.00 $ 190.00 Planning PF-01.02 Zoning General Plan Amendment $5,650.00 $8,763.71 $ 3,113.71 Planning PF-01.03 Zoning Municipal Code Text Amendment $4,729.00 $8,526.23 $ 3,797.23 Planning PF-01.04 Zoning Zone Change $5,640.00 $9,063.84 $ 3,423.84 Planning PF-01.14 Zoning Development Agreement
$1,984 base fee staff time
+Cost + $3,000 Deposit
$3,206.10 Staff Time, plus
$3,000 deposit $ 1,222.10
Planning PF-02.00 Subdivision Tentative Tract Map $2,533.00 $8,556.47 $ 6,023.47 Planning PF-02.01 Subdivision Revision to Tentative TM $1,096.00 $4,353.20 $ 3,257.20 Planning PF-02.02 Subdivision Tentative Parcel Map $2,688.00 $6,726.43 $ 4,038.43 Planning PF-02.03 Subdivision Revisions to Tentative PM $1,096.00 $4,353.20 $ 3,257.20 Planning PF-02.04 Subdivision Vesting Map $2,533.00 $8,556.47 $ 6,023.47 Planning PF-02.05 Subdivision Lot Line Adjustment*** $1,277.00 $2,805.62 $ 1,528.62 Planning PF-02.06 Subdivision Lot Combination/Merger*** $1,453.00 $2,417.76 $ 964.76 Planning PF-02.07 Subdivision Review of Final TM/PM $1,701.00 $6,199.27 $ 4,498.27 Planning PF-02.08 Subdivision Monument Inspection $500.00 $1,564.26 $ 1,064.26 Planning PF-06.02 Review Board Multi Family Res $2,975.00 $8,081.84 $ 5,106.84 Planning PF-06.03 Review Board Commercial, Industrial less than 10,000 sf $2,250.00 $4,650.66 $ 2,400.66 Planning PF-06.04 Review Board Commercial, Industrial more than 10,000 sf $2,250.00 $6,635.06 $ 4,385.06 Planning PF-06.05 Review Board Plot Plan for Tract Maps $277.00 $992.20 $ 715.20 Planning PF-07.11 Review Board Miscellaneous $1,190.00 $952.20 $ (237.80) Planning PF-08.02 Consultant Review CC&R's** $5,794.00
$1166.49 (Staff Cots) + $5,000
Deposit $ 372.49
Planning PF-01.15 Zoning Minor Conditional Use Permit $952.20 $ 372.49 Planning PF-07.14 Miscellaneous Public Noticing (Mailings and Newspaper Ads) Actual Cost $ 372.49 Planning PF-06.10 Review Board Director's Review $952.20 $ 372.49 Planning PF-06.11 Review Board Site Plan Review $500.00 $ 372.49 Planning PF-06.12 Review Board SB 330 Preliminary Review $1,500.00 $ 372.49 Planning PF-06.13 Review Board Preliminary Plan Review 25% of Total Application Fees
Agenda Item Staff Report
To: Honorable Mayor and Members of City Council
For the Meeting of June 24, 2025
From: Brad McKinney, City Manager
Prepared by: Luis Torrico, Director of Community Development Subject: Approve Municipal Code Text Amendment 25-03, Amending the San Dimas Municipal Code, Title 18, Chapter 18.142 Development Standards for Specific Land Uses, to Create Objective Design Standards for Qualified Housing and Mixed-use Developments.
____________________________________________________________________________
SUMMARY
State laws require local jurisdictions throughout California to apply streamlined review processes for certain qualifying housing projects and review them against objective design and development standards. The Housing Accountability Act (HAA) established limitations to a local government’s ability to deny or reduce the density of or make infeasible housing development projects that are consistent with objective design standards and contribute to meeting housing needs. In response to the HAA, several other housing bills have been passed such as Senate Bill 330/Housing Crisis Act (HCA) and Senate Bill 35. Both of these Bills require streamlining of affordable housing developments and require that eligible projects be reviewed against objective design review or development standards. In order to maintain some local control and to regulate eligible developments, Staff has prepared objective design standards that will be applicable to eligible multi-family and mixed-use developments.
RECOMMENDATION
Staff and Planning Commission recommend that the City Council:
• Read by title and introduce Ordinance 1329 approving Municipal Code Text Amendment (MCTA) 25-03.
GOVERNMENT CODE §84308 APPLIES:
https://leginfo.legislature.ca.gov
No
FISCAL IMPACT
MCTA 25-03 Objective Design Standards Page 2
For the Meeting of June 24, 2025
There is no fiscal impact for the recommended action.
BACKGROUND
Over the past several years, the California Legislature has passed a number of housing laws with the intent to alleviate the state’s limited housing supply and affordability crisis. These laws provided statewide initiative and regulations to streamline the process for housing development.
The Housing Accountability Act (HAA) established limitations to a local government’s ability to deny or reduce the density of or make infeasible housing development projects that are consistent with objective design standards and contribute to meeting housing needs. In response to the HAA, several other housing bills have been passed such as Senate Bill 330 (SB 330) (See Attachment 3) and Senate Bill 35 (SB 35) (See Attachment 4).
SB 330 went into effect in 2020 and was passed to increase residential development, protect existing housing inventory and expedite permit processing for eligible residential developments.
Since its passing, the law has been amended to provide clarifications and extend the sunset date from 2025 to 2030. SB 35 went into effect in 2017 and requires cities to streamline residential developments that meet affordability and prevailing wage requirements, by providing a ministerial process and provides flexibility from local parking requirements. Similar to SB 330, SB 35 has been amended to provide clarifications and extend the sunset date from 2026 to 2036. Each of these bills have different eligibility criteria, but both require streamlining of affordable housing developments and require that eligible projects be reviewed against objective design review or development standards.
State law defines an “objective standard” as one that involves no personal or subjective judgement and can be uniformly verified by reference to external and uniform benchmark criteria.
Therefore, the objective standards must be measurable and have clear criteria that are determined in advance so that Staff and an applicant can communicate about a development’s compliance with the standards with specified timelines under the law. In general, the objective design standards will apply to multi-family housing developments, including mixed-use developments. Cities are not required to adopt objective standards; however, without these standards in place, cities will have no control over the appearance and scale of these developments. Projects that are eligible for streamlining and subject to the objective design standards and development standards must meet certain criterion, including:
• SB 330 Projects
o Multi-family housing projects
o Mixed-use projects with at least 2/3 residential square footage o Comply with objective design standards
o No significant public health and safety impacts
• SB 35 Projects
o Multi-family housing projects
o Mixed-use projects with at least 2/3 residential square footage o Comply with objective design standards
o At least 10% or 50% affordable units
o Pay prevailing rate wages (10 units or more)
o No significant public health and safety impacts
Staff worked with Moule & Polyzoides (Consultant) to assist the City with the development of objective design standards that will be applicable city-wide, unless the property is located within
MCTA 25-03 Objective Design Standards Page 3
For the Meeting of June 24, 2025
the Downtown Specific Plan zone (DTSP), in which case, those objective design standards will apply.
On December 12, 2024, Staff presented the design standards to the City Council to seek input and comments. The Council supported adoption of the objective design standards to assist in the development of high-quality architectural projects.
On May 15, 2025, the Planning Commission considered the item (See Attachment 6). During the discussion, the Commission inquired about amending the proposed ordinance to allow the applicant to request an unlimited number of waivers of the objective design standards, subject to the review and approval by the Planning Commission, or in the event that an accompanying application required City Council review, then the City Council would make the final determination on the waivers. With the recommended added language to allow waivers, the Commission recommended approval to the City Council with a 5-0 vote.
DISCUSSION/ANALYSIS
The proposed MCTA will create objective design standards (See Attachment 2) that will allow City Staff to regulate development applications that are eligible for streamlined, ministerial processing under the HAA, including SB 35 and SB 330 projects. The proposed standards will be applicable citywide, with the exception of properties located within the DTSP boundaries, which have their own standards for this purpose. In addition to projects subject to HAA, these standards will also be applicable to all new and proposed multi-family residential and mixed-use developments, and new additions to existing multi-family residential and mixed use developments located in zones that allow two (2) or more residential units and mixed-use, unless the property is located within the DTSP, in which case those design standards shall apply. The standards are meant to enhance the quality and appearance of development projects. The standards are separated into two (2) categories, i.e. Site Design standards and Building Design standards.
Site design standards are site-specific design criteria that aim to establish consistent guidelines for the look, feel, and functionality of a development site. Elements that are included as part of the site design standards include, but are not limited to parking location and design, circulation, open space, and walls and fences. Similarly, building design standards will regulate the design and appearance of structures in the development related to architectural elements and details, massing and articulation, and colors and materials. Both sets of standards are meant to provide a clear direction for the applicant to ensure well designed and detailed, compatible developments.
Existing development standards, such as setbacks and height limits, found in the San Dimas Municipal Code will still be applicable to all projects. Projects that are not eligible for streamlined review under the HAA, will also be subject to any applicable design review process.
Planning Commission Recommendation
As previously mentioned, the Commission recommended approval of MCTA 25-03 with the added language that would allow applicants to request an unlimited number of waivers of the objective design standards, subject to review and approval by the Planning Commission or if applicable, by the City Council. However, the proposed ordinance (See Attachment 1) being considered by the City Council does not include the added language. To ensure compliance with State law, Staff discussed the Commission’s recommendation with the City Attorney’s office.
There were concerns that allowing any number of waivers could conflict with State law.
Specifically, allowing waivers for streamlined projects and making the waivers subject to a
MCTA 25-03 Objective Design Standards Page 4
For the Meeting of June 24, 2025
discretionary review could conflict with the By-Right ministerial process required by the HAA and could undermine the objective standards altogether. In addition, allowing waivers for nonstreamlined projects could be in conflict with State law and the City’s Municipal Code as waivers of any development standards would be subject to the Variance process. Therefore, to be in compliance with State law and the City’s Municipal Code, the Planning Commission’s recommendations for allowing waivers has not been included in the ordinance for consideration.
However, an alternate version that would be in compliance with State law has been included for the Council’s consideration under the Alternative section of this report.
With the passage of several housing laws that are taking away local control, the implementation of these standards is important to ensure developments constructed pursuant to SB 330, SB 35 and any other applicable housing bills result in high-quality multifamily housing and mixed-use projects that the City is accustomed to. While the City may not have control if some of these developments are built, the implementation of these standards will provide some control on the development’s appearance and architectural quality. Furthermore, these standards will also contribute the City’s overall quality development as they will also be applicable to all new and proposed multi-family residential and mixed-use developments, and new additions to existing multi-family residential and mixed use developments located in zones that allow two (2) or more residential units and mixed-use, unless the property is located within the DTSP, in which case those design standards shall apply.
ALTERNATIVES
There are no alternatives proposed for this request; however, the City Council may recommend changes to the proposed standards, including incorporating the Planning Commission’s recommendation to allow applicants to request waivers of objective design standards that would be in compliance with State law.
Should the Council decide to allow waivers, Staff recommends the following to be in compliance with State law and the City’s Municipal Code:
• Waivers would only be applicable to streamlined projects. • Waivers shall not be subject to any discretionary review and the applicant may request and shall be granted the waivers.
• Limit the waivers to up to three (3) waivers from the Site Design Standards category and up to three (3) waivers from the Building Design Standards category. • Non-streamlined projects shall not be eligible for waivers. Any request for modifications or waivers of objective design standards will be subject to a Variance.
If the City Council decides to include waivers into the proposed ordinance, Staff has included the proposed language in Attachment 5 of this report.
ENVIRONMENTAL REVIEW
Pursuant to CEQA guidelines Section 15061 (b)(3), CEQA does not apply to this item because there is no potential for causing a significant effect on the environment. Therefore, no additional environmental review is needed at this time.
Respectfully submitted,
MCTA 25-03 Objective Design Standards Page 5
For the Meeting of June 24, 2025
Luis Torrico
Director of Community Development
Attachments:
1. Ordinance 1329
2. Multi-family Residential & Mixed-Use Objective Design Standards
3. SB 330
4. SB 35
5. Waiver of Objective Design Standards Ordinance Language
6. Planning Commission Staff Report, Resolution PC-198 & Draft Minutes – May 15, 2025
ATTACHMENT 1
ORDINANCE 1329
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN DIMAS,
COUNTY OF LOS ANGELES, CALIFORNIA, APPROVING MUNICIPAL
CODE TEXT AMENDMENT 25-03, A REQUEST TO AMEND THE CITY OF SAN DIMAS MUNICIPAL CODE TITLE 18 TO CREATE OBJECTIVE
DESIGN STANDARDS FOR MULTI-FAMILY RESIDENTIAL AND MIXEDUSE DEVELOPMENT PROJECTS.
WHEREAS, an Amendment to the San Dimas Municipal Code has been duly initiated by the City of San Dimas; and
WHEREAS, the Amendment is described as a Municipal Code Text Amendment to amend the City of San Dimas Municipal Code, Title 18, Chapter 18.142 Development Standards for Specific Land Uses as necessary to create objective design standards for multi-family residential and mixed-use development projects; and WHEREAS, the Amendment would affect all zones citywide, with the exception of properties zoned Downtown Specific Plan, that allow two or more residential units and mixed-use developments. In addition, the proposed amendment will be applicable to projects that are eligible for streamlined ministerial processing under the Housing Accountability Act; and
WHEREAS, on May 15, 2025, the Planning Commission heard evidence on the matter and voted 5-0 to recommend approval of Municipal Code Text Amendment 25-03 to the City Council with added language to allow unlimited waiver of standards subject to review and approval by the Planning Commission or City Council; and WHEREAS, notice was duly given of the public hearing on the matter and that public hearing was held on June 24, 2025, at the hour of 7:00 p.m., with all testimony received being made a part of the public record; and
WHEREAS, all requirements of the California Environmental Quality Act and the City’s Environmental Guidelines have been met for the consideration of whether the project will have a significant effect on the environment.
NOW, THEREFORE, in consideration of the evidence received at the hearing, and for the reasons discussed by the Commissioners at the hearing, the Planning Commission now finds as follows:
A. The proposed Municipal Code Text Amendment will not adversely affect adjoining property as to value, precedent or be detrimental to the area.
The proposed amendment will create objective design standards for qualified housing and mixed-use development projects, which are intended to provide clear and effective standards for the development of high-quality projects. The standards will also be applicable to projects that are eligible for streamlined processing under the Housing Accountability Act, which must only be reviewed against objective
Ordinance 1329 Page 2
MCTA 25-03 Objective Desing Standards
design standards. The proposed amendment will assist in developing high quality projects which will be keeping with the City’s existing character; therefore, adjoining properties will not be adversely affected nor will the amendment be determinantal to the area.
B. The proposed Municipal Code Text Amendment will further the public health, safety and general welfare.
The proposed amendment will further the public health, safety and general welfare by ensuring that qualified housing and mixed-use developments are developed in accordance with the high quality level of architecture that the City is known for. The proposed amendment will create objective design standards, such as parking, lighting and utilities, that take into account the overall safety and general welfare of the public.
C. The proposed Municipal Code Text Amendment is consistent with the General Plan.
The proposed Municipal Code Text Amendment will create objective design standards for qualified housing and mixed-use development projects, which are intended to remove development constraints by providing clear direction to developers but are also intended to result in high quality developments which will be in line with the architectural aesthetic of the City. In addition, the proposed amendments will be consistent with the following General Plan goals:
Land Use L-9: Enhance a unified and a high quality image for the City.
Housing Element HE-2: Opportunities for well-designed and appropriate housing that is diverse in type, location, affordability, and tenure and that meets the full spectrum of current and future housing needs in San Dimas.
Housing Element HE-3: Address and, where appropriate and legally possible, remove or minimize governmental and nongovernmental constraints to the maintenance, improvement, and development of housing.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN DIMAS DOES ORDAIN AS FOLLOWS:
SECTION 1. ADOPTION. Municipal Code Text Amendment 25-03 amending Chapter
18.142 Development Standards for Specific Land Uses, to create objective design standards for multi-family residential and mixed-use development projects, as set forth in Exhibit A, attached hereto and incorporated herein, is hereby adopted.
SECTION 2. SEVERABILITY. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Ordinance is, for any reason, held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more section,
Ordinance 1329 Page 3
MCTA 25-03 Objective Desing Standards
subsection, subdivision, sentence, clause, phrase, or portion thereof be declared invalid or unconstitutional.
SECTION 3. CEQA DETERMINATION. The City Council hereby finds and determines that it can be seen with certainty that there is no possibility that this ordinance may have a significant adverse effect on the environment. Thus, the adoption of this ordinance is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 1506 (b)(3) of the CEQA Guidelines.
SECTION 4. EFFECTIVE DATE AND PUBLICATION. This Ordinance shall take effect 30 days after its final passage. The City Clerk shall certify to the adoption of this Ordinance and cause the same to be posted at the duly designated posting places within the City and published once within 15 days after passage and adoption as may be required by law in a newspaper of general circulation in the City of San Dimas hereby designated for that purpose; or, in the alternative, the City Clerk may cause to be published a summary of this Ordinance and certified copy of the text of this Ordinance shall be posted in the Office of the City Clerk five days prior to the date of adoption of this Ordinance; and, within 15 days after adoption, the City Clerk shall cause to be published, the aforementioned summary and shall post a certified copy of this Ordinance, together with the vote for and against the same, in the Office of the City Clerk
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of San Dimas this 22nd day of July, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________________
Emmet G. Badar, Mayor
ATTEST: APPROVED AS TO FORM:
__________________________ ___________________________
Debra Black, City Clerk Jeff Malawy, City Attorney
I, DEBRA BLACK, CITY CLERK of the City of San Dimas, do hereby certify that Ordinance 1329 was introduced at a regular meeting of said City Council held on the 24th day of June, 2025, and thereafter passed, approved and adopted at a regular meeting of said City Council held on the 22nd day of July, 2025.
___________________________
Debra Black, City Clerk
Ordinance 1329 Page 4
MCTA 25-03 Objective Desing Standards
EXHIBIT A
*New text changes are in Blue and Underlined
*Deleted text is in Red and Strikethrough
CHAPTER 18.142
DEVELOPMENT STANDARDS FOR SPECIFIC LAND USES
18.142.010 Purpose.
18.142.020 Employee housing.
18.142.030 Low barrier navigation centers.
18.142.040 Single room occupancy.
18.142.050 Transitional and supportive housing.
18.142.060 Home care facilities.
18.142.080 Outdoor dining and seating areas.
18.142.090 Objective design standards for multi-family residential and mixed-use development projects.
……
18.142.090 Objective design standards for multi-family residential and mixed-use development projects.
A. Purpose.
The purpose of the multi-family residential and mixed-use objective design standards is to provide the public, design professionals, and decision makers with clear and objective standards for the development of high-quality multi-family housing and mixed-use projects in the City. In addition, these standards aim to comply with requirements under the Housing Accountability Act, including SB 35 and SB 330, by providing objective criteria for qualified streamlined development projects. Per SB 35 and SB 330, an objective design standard means a design standard that involves no personal or subjective judgment by a public official and is uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal of an application.
The City’s multi-family residential and mixed-use objective design standards shall be referenced by title and be available for viewing on the City's community development webpage and upon request at the at City's planning division.
Ordinance 1329 Page 5
MCTA 25-03 Objective Desing Standards
B. Applicability. These standards shall apply to the following:
a. New multi-family residential developments located in all zones that allow multi-family developments, unless the property is located in the Downtown Specific Plan zone, in which case those design standards will apply. b. New mixed-use developments located in any zone that allows mixed-use developments, unless the property is located in the Downtown Specific Plan zone, in which case those design standards will apply.
c. Additions to existing multi-family residential and mixed-use developments which increase the existing floor area by more than 20%, unless the property is located in the Downtown Specific Plan zone, in which case those design standards will apply.
d. New multi-family residential and mixed-use developments eligible for streamlined, and if applicable ministerial processing under the Housing Accountability Act, including SB 35 and SB 330 projects, which include two or more residential units or mixed-use projects with at least two-thirds of the square footage of the development designated for residential use and are subject to certain conditions which may include affordability requirements. In addition, these standards shall apply to all projects eligible for streamlined review, unless the property is located within the Downtown Specific Plan zone, in which case those objective standards shall apply. e. In addition to the objective design standards, all projects must also comply with applicable development standards in the San Dimas Municipal Code and where applicable, subject to the City’s design review process.
C. Conflicting Standards. In the event where a conflict occurs between these objective design standards and those in the Municipal Code or any other applicable standard, the more restrictive standard shall apply.
D. Amendments. Amendments to the objective design standards shall be subject to procedures set forth in Chapter 18.208 of the San Dimas Municipal Code.
Amendments for the sole purpose of clarification and which do not add, delete or modify the intent of the objective design standards may be completed with the approval of the Director of Community Development or designee, and not subject to Chapter 18.208, at the discretion of the Director.
ATTACHMENT 2
M U L T I - F A M I L Y
R E S I D E N T I A L &
M I X E D - U S E O B J E C T I V E
D E S I G N S T A N D A R D S
C I T Y O F S A N D I M AS, C A L I F O R N I A
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California Page i
Preface
This document outlines Objective Design Standards for the City of San Dimas. These standards are divided into three sections. The first section is an introduction to the concept of Objective Design Standards and clarifies the applicability of this document. The subsequent sections constitute the Objective Design Standards: the second section discusses site-specific design criteria and the third section discusses building design criteria. These standards are to be used for all development of multifamily residential and mixed-use projects, across the city, excluding properties located within the San Dimas Downtown Specific Plan. Standards for those properties can be found in the Downtown Specific Plan.
Acknowledgments
The following entities and individuals contributed to the preparation of this document.
CITY OF S AN DIMAS
245 E. Bonita Ave.
San Dimas, California 91773
CONSULTANT
Moule & Polyzoides, Urban Design & Code
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California Page ii
M U L T I - F A M I L Y
R E S I D E N T I A L &
M I X E D - U S E O B J E C T I V E
D E S I G N S T A N D A R D S
CITY OF SAN DIMAS, CALIFORNIA
Adopted by City Council on Month DD, YYYY
Table of Contents
I. I N T R O D U C T I O N
A. Purpose
B. Applicability
II. S I T E D E S I G N S T A N D A R D S
A. Parking Location & Design
B. Circulation
C. Open Space
D. Roof Decks
E. Landscape
F. Lighting
G. Walls & Fences
H. Utilities, Mechanical Equipment & Service Areas
III. B U I L D I N G D E S I G N S T A N D A R D S
A. Building Entries
B. Building Placement & Siting
C. Massing & Articulation
D. Roof Design
E. Architectural Elements & Details
F. Colors & Materials
G. Architectural Consistency
City of San Dimas, California Page 3
I. Introduction
Multi-Family Residential & Mixed-Use
Objective Design Standards Page 614 – 701
City of San Dimas, California Page 4
A . P U R P O S E
The purpose of these standards is to provide the public, design professionals, and decision makers with clear and objective standards for the development of high-quality multi-family housing and mixed-use projects in the City. In addition, these standards aim to comply with requirements under the Housing Accountability Act, including SB 35 and SB 330, by providing objective criteria for qualified streamlined development projects.
Per SB 35 and SB 330, an "objective design standard" means:
...a design standard that involves no personal or subjective judgment by a public official and is uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal of an application.
B . A P P L I C A B I L I T Y
The Multi-Family Residential and Mixed-Use Objective Design Standards shall apply to developments eligible for streamlined, ministerial processing under the Housing Accountability Act, including SB 35 and SB 330 projects, which include two or more residential units or mixed-use projects with at least two-thirds of the square footage of the development designated for residential use and are subject to certain conditions which may include affordability requirements. These standards shall also apply to all new and proposed multi-family residential and mixed-use developments, and new additions to existing multifamily residential and mixed use developments located in zones that allow two or more residential units and mixed-use, unless the property is located within the Downtown Specific Plan, in which case those design standards shall apply. In addition to the objective development standards in this document, projects must also comply with applicable development standards in the San Dimas Municipal Code (SDMC) and where applicable, subject to the City’s design review process. In the event where a conflict occurs between objective development standards and those in the SDMC, the more restrictive standard will apply.
Multi-Family Residential & Mixed-Use
Objective Design Standards INTRODUCTION Page 615 – 701
City of San Dimas, California Page 5
II. Site Design Standards
Multi-Family Residential & Mixed-Use
Objective Design Standards Page 616 – 701
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
A. PARKING LOCATION & DESIGN
All parking lots shall be designed in compliance with the applicable standards contained in Chapter 18.156 Vehicle Parking and Storage of the City of San Dimas Municipal Code, except as modified by the following:
1. Parking shall not be located between the building frontage and a public sidewalk.
2. No parking space shall require the vehicle to backup within the first 20 feet from the street right-of-way, parking lot entrance, or parking lot exit.
3. The first twenty feet of the primary driveway, as measured from the property line into the property, or an appropriate termination (i.e. end of planter), whichever is greater, shall consist of pavers or concrete that is colored, stamped, or textured.
4. For mixed-use developments, parking for the residential uses shall be provided and maintained separate and secure from the on-site commercial/ public parking.
5. Garage Entry Design
a. Parking garage entrances shall be designed as doorways or gateways that are consistent with the design of the rest of the building. (Fig. II.A.1) b. Garage doors and gates shall be recessed at least 12-24 inches from the adjacent wall plane.
c. The minimum separation between the garage entrances of two adjacent buildings shall be 10 feet.
d. Parking entrances shall be placed to avoid existing street trees, utilities infrastructure. New driveways providing accessto corner lotsshall be located as close to the property line away from the corner as possible.
6. Parking garages located more than 5 feet above the sidewalk level shall be lined with usable space at least 12 feet in depth. Not more than 25 percent of the parking garage shall be visible from the street.
7. Landscaping in Surface Parking Lots
a. A minimum of one shade tree shall be provided for every 6 parking spaces. b. Parking areas shall have a continuous landscape strip along at least 50 percent of their perimeter. The minimum width of this landscape strip shall be 5 feet of interior clear planting space when no parking overhangs into the planter.
When parking overhangs on one side, the
minimum dimension shall be 6 feet of clear planting space. This parking strip shall be allowed to be interrupted by walkways that access the building. (Fig. II.A.2)
c. The minimum dimension of landscaped areas or planters at the end of a row of parking spaces shall be 7 feet wide and in between two parking spaces shall be 8 feet wide. (Fig.II.A.3)
d. No more than 6 parking spaces shall be located consecutively in one row without being separated by a landscaped area.
e. Planting areas shall be bounded by 6-inch concrete curbs.
FIG. II.A.1: PARKING GARAGE ENTRY
This garage is designed as an artistic doorway.
FIG. II.A.2: LANDSCAPED PARKING
The planted area between parking rows is designed as a
sustainable bioswale, which absorbs water run-off.
FIG. II.A.3: LANDSCAPED PARKING
A planted area located between parking stalls provides
space for canopy trees to shade cars and reduce the
parking lot's heat island effect.
SOURCE: RICHIE DIESTERHEFT (CC BY-SA 2.0) (EDITED)
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
f. All landscaping shall be maintained in a disease-free state. g. Parking lots at the side of buildings facing a street shall be separated by a natural or architectural barrier, such as walls or shrub plantings, that are a minimum height of 3 feet from the adjacent grade. Driveways and walkways are permitted to interrupt this barrier. (Fig II.A.4)
h. Landscape materials shall consist of native California and drought- tolerant material complying with the City of San Dimas Model Water Efficient Landscape Ordinance (MWELO).
i. Trees shall be a minimum of 15 gallon. Shrubs shall be a minimum of 5 gallon. Ground cover shall be one (1) gallon or flats.
j. All areas not covered with plant material shall be covered with3-inch high mulch or decomposed granite.
k. Landscaping shall be maintained by an electric remote control automatic sprinkler or drip-irrigation system.
8. Bicycle Parking
a. Multi-family residential projects shall provide 0.2 racks per unit, with a minimum of 1 two-bicycle capacityrack.
b. Mixed-Use projects shall provide:
i. Short term parking: 5% of vehicle parking, with a minimum of 1 twobicycle capacity rack. ii. Long term parking: Secure parking for 5% of vehicle parking, with a minimum of 1 two-bicycle capacityrack.
c. Bicycle parking shall be located on-site and within 100 feet of the building's principal entrance, or located within the building's parking garage within fifty (50) feet of an elevator. Bicycle parking shall not be visible from the sidewalk or any common open space within the building.
B . CIRCULATION
1. Pedestrian Circulation
a. All structures, entries, facilities, common open spaces, amenities, and parking areas shall be internally connected by private pedestrian circulation pathways with a minimum width of 4 feet. (Fig.II.B.1)
b. Public or private pedestrian walkways shall connect to the public sidewalk along a street frontage.
c. Private pedestrian walkways shall be separated from driveways by a physical barrier of 6 inches or more in height or a raised plantingstrip. d. When unit entries face a driveway, pedestrian walkways shall be located between the drive aisle and the unit. The walkway shall connect to a public right-of-way without crossing a drive aisle.
2. Vehicle Circulation/Access
a. Sites with alley accessshall provide parking accessfrom the alley. (Fig. II.B.2) b. Sites without alley access shall provide parking access from the primary FIG. II.A.4: PARKING AREA SCREENING
A planting strip and an articulated wall separate a surface parking lot from the sidewalk.
FIG. II.B.1: CIRCULATION ELEMENT
A common corridor connects residential courtyards with
amenity spaces on the ground floor of a mixed-use building.
FIG. II.B.2: ACCESS FROM ALLEY
Access to this building's parking garage is discretely
provided on a rear alley at the back of a building.
SOURCE: GOOGLE EARTH
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
street via driveways located as close to the side property line as possible. c. Corner lots without alleys shall provide parking access from the side street, with driveways located as far from the street intersection as possible. d. Parking lots within a single parcel shall be internally connected with shared driveways.
C. OPEN SPACE
Common and private open shall be provided as required by the San Dimas Municipal Code, except as modified by the following:
1. Common Open Space
a. The minimum dimension of a common open space in any direction shall be 20 feet.
b. Common open space shall satisfy the minimum requirements by providing at least one passive or active recreation amenity. (Fig. II.C.1) i. A passive recreation amenity is defined as: a picnic /BBQ area; a pet area /dog park; a courtyard /plaza; a roof deck.
ii. Each passive recreation amenity shall include a minimumcapacity of 1 seat per 10 units and at least one of the following elements: a trellis, gas fire pit, BBQ, or permanently installed picnic table.
iii. An active recreation amenity is defined as: a playground/tot lot; sport court/field; fitness area; swimming pool; clubhouse with kitchen; or a recreation hall.
c. Internal courtyards and common areas at the lowest habitable level of a building shall be connected to each other with covered or open-to-sky pedestrian walkways.
d. Common space excludes streets, vehicle parking areas, accessways, and distances between buildings of lessthan 10 feet. Required yard setbacks shall be included provided they are designed as usable open areas with a minimum depth of 10 feet.
2. Private Open Space
a. All private open space shall be directly accessible from the unit it serves. b. Any private open space at the lowest habitable level of a building shall have a minimum depth of 10 feet and a minimum area of 100 square feet. (Fig.
II.C.2)
c. All private open space/balconies at the upper levels of a building shall have a minimum depth of 5 feet and a minimum area of 45 square feet. d. Ground floor patiosshall be enclosed with a decorative block wall or fencing consistent with the building’s finish material. The minimum height of shall be 4 feet.
FIG. II.C.1: COMMON OPEN SPACE
This common open space includes seating and a water
feature to encourage a shared sense of ownership.
FIG. II.C.2: PRIVATE OPEN SPACE
This private patio is enclosed with landscape, and
provides open space as an outdoor living room.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
D . ROOF DECKS
1. Roof decks shall comply with Section C (Open Space) of these Standards and count towards minimum open space requirements. (Fig. 11.D.1)
2. Roof deck materials, finishes, fixtures, and colors visible from the street – including trellises, railings, and walls – shall be designed in a manner that is consistent with the architectural language of thebuilding.
E. LANDS CAPE
1. Landscape Requirements
a. All required yards, spaces between buildings, and open space shall be landscaped pursuant to an approved landscape plan in compliance with Section 18.14 Water-Efficient Landscapes of the City of San Dimas Municipal Code.
b. Artificial trees, shrubs, and plants are prohibited within any landscape area visible from the public right-of-way. Artificial turf may be used subject to compliance with Chapter 18.14 of the San Dimas Municipal Code. c. Landscape materials shall consist of native California and drought- tolerant material. (Fig. II.E.1)
d. LandscapedBuffer:The following shall be provided along the edges of all interior lot lines that abut a single-family residential zoned lot or singlefamily use:
i. A decorative masonry wall per the fencing/wall requirements of these standards.
ii. The requirement for a decorative wall shall be waived if a decorative wall exists on adjacent lots.
iii. A 5-foot minimum wide landscaped buffer.
iv. A row of evergreen trees to screen views to and from the adjacent lots. v. If an alley or street is between the subject site and the single-family zoned lot(s) the above-mentioned requirements are not required.
2. Hardscape Requirements
a. Paving materials used in yards, setbacks, common open space areas, walkways, and patios shall be allowed to include cast-in-place concrete, stamped concrete, concrete unit pavers, stone, brick, tile, aggregate recycled paving materials, and permeable paving materials. (Fig.II.E.2) b. Decomposed granite and recycled aggregate shall be retained at the edge by concrete, wood, steel, or recycled headers and designed to minimize transference of these materials onto adjacent streets, alleys, sidewalks, and the public right-of-way. (Fig.II.E.3)
c. Permeable paving materials shall be allowed to help reduce the impervious surface area of the site and minimize stormwater runoff.
FIG. II.D.1: ROOF DECK AS OPEN SPACE
This rooftop terrace includes a trellis, planters, and fixed and permanent seating to define an 'outdoor room'.
FIG. II.E.1: NATIVE PLANTING
The landscaping in this garden is a combination of native and climate-adapted plants.
FIG. II.E.2: PERMEABLE PAVERS
Bricks in a permeable setting bed are a sustainable
hardscape solution that minimize stormwater runoff.
FIG. II.E.3: AGGREGATE EDGE
This aggregate path is retained at the edge by a row of cobbles
SOURCE: BREWBOOKS (CC BY-SA 2.0) SOURCE: ACES (CC0 1.0) SOURCE: ROBERT R. GIGLIOTTI (CC BY-SA 3.0)
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
F. LIGHTING
1. Lightfixtures on building facades visible frompublic streetsshall be selected to be compatible with the style of thebuilding.
2. Site lighting, including dusk-to-dawn lighting, shall be required in all parking areas, common open spaces, exterior service areas, and other areas used by pedestrians outside the building envelope. (Fig. II.F.1)
3. Light postsforsurface parking or residential pedestrianwalkwaysshall not exceed 14 feet in height. Wall pack lights are prohibited. (Fig.II.F.2)
4. Site lighting shall be directed downward and shielded to prevent upward light pollution. (Fig. II.F.3)
5. Site lighting shall not spill into residential units or adjacent lots or create off- site glare shall be prohibited.
6. Site lighting shall emit a white light that renders true colors. Sodium vapor, or other lights casting a colored glow, shall not be used. This standard does not apply to colored accent lighting for special building elements, signs, or landscape or water features.
G . WALLS & FENCES
1. Perimeter and property line walls shall consist of decorative concrete masonry unit (CMU) with a stucco finish, brick, or stone veneer, slump stone, or split face with pre-cast concrete, block, stone or brick trim cap. Interior walls, fences, and gates shall consist of wrought iron, wood, plastic/ wood composites, brick and stone materials. Unfinished concrete masonry unit (CMU), chain link fences, barbed wire, razor wire, electric wire, and similar wire types are prohibited at all conditions.
2. Walls and fences shall be compatible with the style of the building.
3. Both sides of all perimeter walls and fences shall be architecturally treated, with the exception of trash enclosures. The interior of the trash enclosures shall be painted with high durability paint.
4. Walls at the ground plane shall be finished with a pre-cast concrete, stone, or brick trim cap.
5. Retaining walls within the primary or side street setback area shall be constructed of cast in place concrete or concrete masonry unit (cmu)with a stucco, brick, or stone finish and shall be compatible with the building's finish.
FIG. II. F.1: SITE LIGHTING
Lanterns illuminate a walking path.
FIG. II. F.2: PROHIBITED LIGHTING
Wall Pack lights on building facades are prohibited.
FIG. II. F.3: DOWNWARD LIGHTING
Low profile lanterns direct light downwards to reduce
light pollution on site.
FIG. II.G.1: PERIMETER WALLS
The property-line walls enhance the architectural
character and serve an additional function as planters.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
H. UTILITIES, MECHANICAL E Q UIPMEN T &
SERVICE AREAS
1. Utilities - All new utilities on a site shall be installed underground from the nearest service connection off-site.Any on-site service pole(s) thatservice the subject site shall be removed and the lines redirected underground to a service connection off-site. Adjacent utility poles located within/along the property frontage shall be removed and the service lines redirected underground to the nearest service pole off-site not directly adjacent to the subject site.
2. Mechanical Equipment
a. Mechanical equipment regardless of location shall be screened from pedestrian view. (Fig. II.H.1)
b. Mechanical equipment on roofs shall be located on flat portions of the roof or on pitched roofs that provide an equipmentwell.
c. Rooftop screens shall be fully opaque. Mechanical equipment shall not exceed the height of adjacent parapet walls, equipment wells, orscreens. (Fig.
II.H.2)
d. Mechanical equipment located at ground level shall not be located between the building and the public right-of-way.
e. Heaters and air conditioning units shall not be installed within window openings. Exterior ducting is prohibited.
f. Air intake and exhaust systems that generates noise, smoke, or odors shall be vented to the roof or to the ceilings of covered balconies. g. Garage air exhaust systems shall not be located within 10 feet of the primary street property line or on any common open spaces.
h. Mechanical equipment serving an individual unit may be placed within that unit's private open space.
i. All flashing, sheet metal vents, exhaust fans / ventilators, and similar equipment shall be painted to match the nearest building wall.
3. Electrical Equipment.
a. Electrical equipment located on a rooftop shall be screened from pedestrian view. Rooftop screens shall be fully opaque. Electrical equipment shall not exceed the height of adjacent parapet walls, equipment wells, or screens. b. Electrical equipment located at ground level shall be screened from pedestrian view by a natural or architectural barrier, such as walls or shrub plantings, and meet the requirements of the utility provider. c. Allwall-mounted utility elementsshall be located to ensure they are concealed from pedestrian view.
FIG. II.H.1: SCREENING ALONG ALLEY
This wall provides an attractive screen for equipment
located on the ground level.
FIG. II.H.2: SCREENING FROM ROOF
This mechanical equipment is screened from view in a
roof well with a low parapet wall.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
SITEDESIGNSTANDARDS
4. Service Areas
a. Accessto service areas of buildings and sitesshall be provided asfollows:
i. Service entrances, waste disposal areas, and other similar service areas shall be screened from view regardless of location on site. (Fig. II.H.2) ii. For lots with alley access, service entrances, waste disposal areas, and other similar service areas shall be located adjacent to and accessed from the alley. (Fig. II.H.3)
iii. When an alley is not present, service entrances, waste disposal areas, and other similar service areas shall not be located within the front setback.
They shall be located at least 20 feet behind the primary building face.
On corner lots, the service entrance shall not be located along the same side of a building as its primary entrance.
5. Trash Enclosures
a. Trash, recycling, organic waste, and green waste bins and dumpsters shall be housed in a covered refuse enclosure with a gate that screens the trash receptacles. Sizing of the enclosures shall conform to solid waste provider requirements. (Fig. II.H.4)
b. Trash enclosures shall be finished with the same primary wall material and color as the nearest building within the development and shall comply with the City of San Dimas Standard.
c. Trash enclosures shall have both a vehicular access gate with a concrete apron, and a pedestrian entrance. Gates shall be opaque. Access shall conform to solid waste provider requirements.
d. Trash enclosures shall include interior dusk to dawn lighting for safety and security.
FIG. II.H.3: SERVICE AREA
This service area is accessed from the alley.
FIG. II.H.4: TRASH ENCLOSURE
This trash enclosure is built with CMU blocks, mesh
screen, and covered by an corrugatedmetal.
City of San Dimas, California Page 13
III. Building Design Standards
Multi-Family Residential & Mixed-Use
Objective Design Standards Page 624 – 701
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California BUILDING DESIGN
A. BUILDING ENTRIES
1. All ground floors shall be accessed from the sidewalk of the primary street.
Ground floor residential and commercial units shall be directly accessible from a street or via common areas such as paseos, courtyards, and active landscape areas.
2. Entranceways and doorways shall be clearly identifiable as prominent points of access into buildings. (Fig. III.A.1)
3. Residential unit entrances directly accessed from a public right-of-way shall be covered.
a. The minimum depth of coverage shall be the length of the door out- swing plus 12 inches.
b. Coverage shall be achieved by recessing the entrance or projecting an awning overhead. A combination of both shall be allowed to meet this requirement provided both of the following conditions are satisfied:
i. The recession depth is a minimum of 6inches.
ii. The awning depth is a minimum of 18 inches.
4. Secondary storefront and lobby entrances shall be allowed on rear and interior side facades.
5. Upper-floor uses shall be accessed through an exterior stair, interior stair, or lobby. Exterior stairs leading to upper floor shall not discharge people directly onto the sidewalk. Exterior stairs leading to upper floors shall face interior spaces, suchas paseos, courtyards, and active landscape areas.
6. Residential and commercial entrances for Mixed-Use developments may be located on the same elevation, but shall be separated and differentiated from each other through design or use of different materials. Work-live units may have one main entry for both the residential and commercial component. (Fig.
III.A.2)
7. Exterior security gates shall be allowed at one end of a semi-open corridor, paseo, or passage. Exterior gates shall have at least 75 percent transparency. (Fig.
III.A.1)
B. BUILDING PLACEMENT / SITING
1. Corner lots may be designed with a convex or a concave building corner. In either case, the walls comprising the building corner shall have active ground floors and windows above. (Fig. III.B.1)
2. On sites with more than one public corner, at least one building corner shall be designed convex.
3. Street-facing facades shall be parallel to the right-of-way, for a minimum of 75% of the streetface.
FIG. III.A.1: PEDESTRIAN ACCESS
The main entrance to this multi-family building is
prominent passage protected by a decorative security gate.
FIG. III.A.2: MIXED-USE ENTRANCES
An arched zaguan distinguishes a shared residential
entrance from commercial storefronts of this facade.
FIG. III.B.1: CONVEX CORNER
This convex corner is accentuated by a tower in addition to pilasters.
SOURCE: GOOGLE EARTH
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
C. MAS S ING & ARTICULATION
1. Massing
a. For buildings three stories in height - The third floor shall step back on all sidesfacing a public right-of-way or parking lot unless, the elevation(s) faces another windowless building facade or alley or freeway. The step back shall be a minimum of 10 feet from front face of the first/second floor. b. For building four stories or more - The fourth floor and all floors above the fourth floor shall step back on all sides facing a public right-of-way or parking lot unless, the elevation(s) faces anotherwindowless building facade or alley or freeway. The step back shall be a minimum of 10 feet from front face of the third floor. (Fig.III.C.1)
c. Recessed architectural elements or spaces, such as porches, covered passages, and balconies, into the plane of the façade shall be a minimum of 5 feet in depth.
d. Projecting architectural elements, such as bay windows, cantilevered rooms and/or awnings, shall not project more than 48 inches from the main façade.
2. Articulation
FIG. III.C.1: UPPER-STORY STEPBACKS
The fourth story of this building steps back to respect the prevailing height of existing buildings on this street.
FIG. III.C.2: FACADE MODULATION
a. The facade of any individual building more than 100 feet in length shallThe length of this building facade is broken up by be modulated forward or backward from the predominant facade plane for a minimum depth of 4 feet and for a minimum length of 20 feet. At least one modulation shall be provided for every 50-foot length of the predominant building facade plane. (Fig. III.C.2)
b. The facade of any individual building up to 100 feet in length shall be required to provide one of the following, a break in roofline articulation or a projecting element that is at least the length of one third the building facade.
c. See III.D. Roof Design for the corresponding requirements for rooflines.
3. Facade Differentiation
a. Individual buildings that are over 150 feet in length shall have the facade designed as at least two distinct building increments with differing material and/or color combinations on each building increment.
4. Floor Level Articulation
a. A building's first story shall be differentiated from the floors above by at least one of the following (Fig.III.C.3):
(a) Continuoushorizontalarticulationbetweenthefirst-floordoor/ window header height and the second-floor window sill height (such as a cornice or belt course or wainscot.
(b) Distinct exterior cladding, a material change, or a color change from upper floors.
(c) Larger window openings, such as storefronts.
b. The eaves of sloped roofs shall be differentiated by exposed rafters or a soffit that differs materially from the wall surface and fascia cover. modulations in the predominant facade plane.
FIG. III.C.3: FLOOR LEVEL ARTICULATION
This mixed-use building differentiates the ground floor with large gallery openings and a cornice.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
D . ROOF DESIGN
1. Roofline Articulation
a. Roofline articulation shall correspond to the facade modulations required by Section III.C.2.a. of these Standards. Roofline articulation is defined as one of the following techniques:
i. A change in parapet or roof height of a minimum 4 feet. ii. The inclusion of dormers, gables, and/or a change in cornice profile.
2. Roof style shall be consistent throughout. Pitched roofs shall consist of one primary slope, with allowance to deviate for architectural elements such as towers and rotundas. (Fig. III.D.1)
3. Parapet Design
a. Parapets shall be capped with coping, capped precast, continuous banding, projecting cornice or similar design, and shall be consistent with the building’s architectural style. All coping shall provide a minimum one inch projection from the exterior face of the parapetwall.
b. Sheet metal coping shall comply with the Sheet Metal andAir Conditioning Contractors’ National Association standards.
E. ARCHITECTURAL ELEMENTS/DETAILS
1. Balconies, patios and porches
a. All ground floor residential units shall include a patio, porch, or stoop.
2. Balcony
a. Balconies shall have a minimum depth of 5 feet and a minimum areaof 45 square feet.
b. Balcony design character, palette of materials, and approach to detailing shall be consistent with the building's style. (Fig.III.E.1) c. Balconies of traditionally-styled buildings shall have visible supports in the form of projecting beams orbraces.
3. Bay Window
a. Bay windows shall be a maximum of 5 feet wide. (Fig.III.E.2) b. Bay windows shall be placed a minimum of 2 feet from any building corner and a minimum of 3 feet from any other bay window. Bay windows are permitted on building corners when incorporated as part of a turret. c. Bay windows shall consist of at least 75% transparent fenestration.
4. Awnings
a. Ground floor
i. Awnings shall be of a simple shed form, made of code-compliant fireresistant and water-repellent canvas or materials of similar appearance and performance. (Fig. III.E.3)
ii. Each awning shall correspond to a storefront.
FIG. III.D.1: ROOFLINE ARTICULATION
The use of dormers articulates this building's roofline creating a distinct character.
FIG. III.E.1: BALCONIES
Wrought-iron Juliet balconies with supporting brackets
on a traditional style building.
FIG. III.E.2: BAY WINDOWS
A traditionally detailed bay window.
FIG. III.E.3: AWNINGS
Awnings provide an opportunity to give distinct character to storefronts.
SOURCE: RICKY LEONG (CC BY-NC-ND 2.0)
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
iii. Awnings shall not obstruct building signage.
iv. Awning color(s) and pattern(s) shall be coordinated with the overall design of the building. Awning colors shall be allowed to vary between adjacent businesses.
v. Internally illuminated and backlit awnings and any associated light diffusers are permitted on the ground floor.
vi. The minimum projection of an awning, measured from the face of the building, shall be 4 feet and the maximum projection shall not be more than 10 feet.
b. Upper floor
i. Signage is prohibited on upper floor awnings.
ii. Internally illuminated and backlit awnings and any associated light diffusers are prohibited on upper floors.
FIG. III.E.4: CANOPY
Canopies provide shade and rain cover along the sidewalks.
5. Canopy
a. Canopies shall not be cantilevered without secondary structural supports.
Canopies shall be supported from below by metal brackets, or suspended from above by rods, wires, or chains that affix to the wall. b. Canopies shall be allowed to extend across multiple storefronts. c. Canopies shall not obstruct signage.
d. Signage is prohibited on upper floor canopies.
e. All canopies on a single building increment shall be consistent in their design, color, and material. (Fig. III.E.4)
f. The minimum projection of a canopy, measured from the face of the building, shall be 3 feet and the maximum projection shall not be more than 5 feet.
6. Cantilevered Rooms
a. A cantilevered room shall be a maximum of 20 feet wide. b. Cantilevered rooms shall be placed a minimum of 10 feet fromany other cantilevered room.
c. Cantilevered rooms of traditional style buildings shall be supported by brackets, extended beams, or other elements that project from the underside of the volume. (Fig.III.E.5)
d. Cantilevered rooms shall not project more than 48 inches.
7. Stoops
a. The maximum height of a stoop shall be 3.5 feet from the level of the adjacent grade. (Fig. III.E.6)
b. Stoops shall be provided as primary frontage elements to transition from the public right-of-way to the entrance of a ground floor unit. Their material and design shall be consistent with that of the building.
c. Stoops shall be a minimum depth of 4 feet and width of 6 feet. d. The landing shall be allowed to be covered or uncovered.
8. Mixed-use commercial storefront
a. Minimum ground floor ceiling height shall be 12 feet clear measured from face of finished ceiling to finish floor.
FIG. III.E.5: CANTILEVERED ROOMS
A second-floor room with supporting beams below
projects out from the facade
FIG. III.E.6: STOOPS
Elevated stoops transition the public realm intothe
private realm of individual residences.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
b. Storefront glass shall be clear without reflective coating or dark tinting.
Interior perforated shades shall be permitted.
c. Storefronts shall be illuminated so building signage is legible at night. d. Interior display lights shall be installed in all storefront display windows along the public right of way and remain on at night to create visual interest and promote safe space along sidewalks/walkways.
e. Doors shall match the materials, design, and character of the display window framing.
f. At least 60 percent of ground-floor street-facing walls shall include transparent glazing. (Fig. III.E.7)
g. The header height for all openings on any commercial ground floorshall be a minimum of 10 feet and may be composed of windows, doors, and transom windows.
h. Doors and windows on any commercial ground floor with a minimum of 6 feet in width shall use transom windows.
i. The primary street-facing entry shall be differentiated by including one of the following: canopy or awning; change in roofline; tower; recessed entry; material change.
j. Roll-down security doors shall not be permitted on the exterior side of storefronts. Security gates are permitted on the interior side provided they provide at least seventy-five percent transparency.
9. Windows and Doors
a. One primary window style and material shall be used throughout an individual building.
b. Windows with an exterior vinyl finish are prohibited. c. Extruded aluminum windows without exterior cladding are prohibited. d. Window and door materials shall be wood, fiberglass, steel, or aluminum with exterior cladding.
e. Windows shall be allowed with muntin patterns and colors appropriate to the building’s architectural style.
f. Windows and doors shall either be trimmed or recessed. i. When trimmed, the trim material shall not be less than 3 ½ inches in width by ¾ inches in depth as measured from the face of the exterior wall finish. Head casing shall be a minimum ½ inch wider than jamb casing. Foam trim molding is prohibited on the ground floor. (Fig.
III.E.8)
ii. All doors and windows shall be recessed a minimum of 2 inches as measured from the face of the exterior wall finish. The finish material shall wrap the corner and extend into the opening to the exterior face of the door or window. The depth of casing shall not contribute to the minimum recess requirement. (Fig. III.E.9)
FIG. III.E.7: FIRST FLOOR TRANSPARENCY
The ground floor of this mixed-use building features
more glazing than the upper story.
FIG. III.E.8: WINDOW TRIM
This Craftsman style window trim includes head casing on the top that is wider than the jamb casing on the sides.
FIG. III.E.9: RECESSED DOORS
Ground floor commercial entrances are recessed inside
arches at this mixed-use project.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
iii. Windows shall be recessed in a manner that is authentic to the building’s architectural style.
(a) In Mediterranean style buildings, doors and windows at the ground floor shall be recessed a minimum of 4 inches as measured from the face of the exterior wall finish. The finish materialshall wrap the corner and extend into the opening to the exteriorface of the door orwindow.The depth of casing shall not contribute to the minimum recess requirement.
(b) In craftsman, colonial, and Victorian style buildings, doors and windows shall be recessed a minimum of 2 inches as measured from the face of the exterior wall finish. The finish material shall wrap the corner and extend into the opening to the exterior face of the door or window. The depth of casing shall not contribute to the minimum recess requirement.
g. Residential glazing shall not be tinted beyond what is required for compliance with energy efficiency requirements set by Title 24. h. The width of each paired shutter shall be equal to one-half the width of the window opening; unpaired single shutters shall be the same width of the adjacent window opening.
F. COLORS & MATERIALS
1. Buildings shall have a color palette that consists of a body color andan accent color (not including roof color).
2. Projects with 2 or more residential buildings shall include a minimum of 2 body colors and shall not use a single body color on more than 75 percent of the residential structures. (Fig. III.F.1)
G . ARCHITECTURAL CONSISTENCY
1. Materials
a. Buildings shall incorporate a minimum of 2 and a maximum of 3 exterior wall finish materials on each building elevation. Trim does not count as the second material.
b. The following materials shall be prohibited as exterior finishes: T1-11; vinyl siding; unfinished concrete masonry block.
c. All exterior brick cladding shall be composed of individual brick size modules. (Fig. III.G.1)
d. All panel cladding is prohibited.
e. Masonry veneer walls shall be detailed in a manner that expresses the structural integrity of real masonry. Stone material shall not be painted; brick may be painted. (Fig. III.G.2)
FIG. III. F.1: BUILDING COLORS
The two residential buildings comprising this project are differentiated by distinct yet complementary colors.
FIG. III.G.1: INDIVIDUAL BRICK
This building uses a veneer of individual bricks and
traditional detailed coursing for headers and cornices.
FIG. III.G.2: MATERIAL CHANGE
A change in material from masonry to stucco delineates
a shift from ground-floor commercial to upper-story
residential in this mixed-use building.
Multi-Family Residential & Mixed-Use
Objective Design Standards
City of San Dimas, California
BUILDING DESIGN
f. Exterior wood shall be painted, or of a cedar or redwood species with a clear finish.
g. Metal flashing shall be painted to match the building finish.
2. Changes in materials and colors shall occur along horizontal lines or at internal building corners only. Material changes at outside corners shall be prohibited.
When the span to an inside corner is 25 feet or more, the change in material and colors shall wrap around the corner of the building and extend a minimum of 6 feet beyond the corner, or terminate at the nearest window or door.
Senate Bill No. 330
CHAPTER 654
An act to amend Section 65589.5 of, to amend, repeal, and add Sections 65940, 65943, and 65950 of, to add and repeal Sections 65905.5, 65913.10, and 65941.1 of, and to add and repeal Chapter 12 (commencing with Section 66300) of Division 1 of Title 7 of, the Government Code, relating to housing. [Approved by Governor October 9, 2019. Filed with Secretary of State October 9, 2019.]
legislative counsel’s digest
SB 330, Skinner. Housing Crisis Act of 2019.
(1) The Housing Accountability Act, which is part of the Planning and Zoning Law, prohibits a local agency from disapproving, or conditioning approval in a manner that renders infeasible, a housing development project for very low, low-, or moderate-income households or an emergency shelter unless the local agency makes specified written findings based on a preponderance of the evidence in the record. The act specifies that one way to satisfy that requirement is to make findings that the housing development project or emergency shelter is inconsistent with both the jurisdiction’s zoning ordinance and general plan land use designation as specified in any element of the general plan as it existed on the date the application was deemed complete. The act requires a local agency that proposes to disapprove a housing development project that complies with applicable, objective general plan and zoning standards and criteria that were in effect at the time the application was deemed to be complete, or to approve it on the condition that it be developed at a lower density, to base its decision upon written findings supported by substantial evidence on the record that specified conditions exist, and places the burden of proof on the local agency to that effect. The act requires a court to impose a fine on a local agency under certain circumstances and requires that the fine be at least $10,000 per housing unit in the housing development project on the date the application was deemed complete.
This bill, until January 1, 2025, would specify that an application is deemed complete for these purposes if a preliminary application was submitted, as described below.
Existing law authorizes the applicant, a person who would be eligible to apply for residency in the development or emergency shelter, or a housing organization to bring an action to enforce the Housing Accountability Act.
If, in that action, a court finds that a local agency failed to satisfy the requirement to make the specified findings described above, existing law requires the court to issue an order or judgment compelling compliance with the act within 60 days, as specified.
88 STATE OF CALIFORNIA
AUTHENTICATED
ELECTRONIC LEGAL MATERIAL
ATTACHMENT 3
This bill, until January 1, 2025, would additionally require a court to issue the order or judgment previously described if the local agency required or attempted to require certain housing development projects to comply with an ordinance, policy, or standard not adopted and in effect when a preliminary application was submitted.
Existing law authorizes a local agency to require a housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdiction’s share of the regional housing need, as specified.
This bill, until January 1, 2025, would, notwithstanding those provisions or any other law and with certain exceptions, require that a housing development project only be subject to the ordinances, policies, and standards adopted and in effect when a preliminary application is submitted, except as specified.
(2) The Planning and Zoning Law, except as provided, requires that a public hearing be held on an application for a variance from the requirements of a zoning ordinance, an application for a conditional use permit or equivalent development permit, a proposed revocation or modification of a variance or use permit or equivalent development permit, or an appeal from the action taken on any of those applications. That law requires that notice of a public hearing be provided in accordance with specified procedures.
This bill, until January 1, 2025, would prohibit a city or county from conducting more than 5 hearings, as defined, held pursuant to these provisions, or any other law, ordinance, or regulation requiring a public hearing, if a proposed housing development project complies with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete, as defined. The bill would require the city or county to consider and either approve or disapprove the housing development project at any of the 5 hearings consistent with the applicable timelines under the Permit Streamlining Act.
(3) The Permit Streamlining Act, which is part of the Planning and Zoning Law, requires each state agency and each local agency to compile one or more lists that specify in detail the information that will be required from any applicant for a development project. That law requires the state or local agency to make copies of this information available to all applicants for development projects and to any persons who request the information.
The bill, until January 1, 2025, for purposes of any state or local law, ordinance, or regulation that requires a city or county to determine whether the site of a proposed housing development project is a historic site, would require the city or county to make that determination, which would remain valid for the pendency of the housing development, at the time the application is deemed complete, except as provided. The bill, until January 1, 2025, would also require that each local agency make copies of any above-described list with respect to information required from an applicant for a housing development project available both (A) in writing to those 88 Ch. 654 — 2 —
persons to whom the agency is required to make information available and (B) publicly available on the internet website of the local agency.
The Permit Streamlining Act requires public agencies to approve or disapprove of a development project within certain timeframes, as specified.
The act requires a public agency, upon its determination that an application for a development project is incomplete, to include a list and a thorough description of the specific information needed to complete the application.
Existing law authorizes the applicant to submit the additional material to the public agency, requires the public agency to determine whether the submission of the application together with the submitted materials is complete within 30 days of receipt, and provides for an appeal process from the public agency’s determination. Existing law requires a final written determination by the agency on the appeal no later than 60 days after receipt of the applicant’s written appeal.
This bill, until January 1, 2025, would provide that a housing development project, as defined, shall be deemed to have submitted a preliminary application upon providing specified information about the proposed project to the city or county from which approval for the project is being sought.
The bill would require each local agency to compile a checklist and application form that applicants for housing development projects may use for that purpose and would require the Department of Housing and Community Development to adopt a standardized form for applicants seeking approval from a local agency that has not developed its own application form. After the submittal of a preliminary application, the bill would provide that a housing development project would not be deemed to have submitted a preliminary application under these provisions if the development proponent revises the project such that the number of residential units or square footage of construction changes by 20% or more until the development proponent resubmits the information required by the bill so that it reflects the revisions. The bill would require a development proponent to submit an application for a development project that includes all information necessary for the agency to review the application under the Permit Streamlining Act within 180 days of submitting the preliminary application.
The bill, until January 1, 2025, would require the lead agency, as defined, if the application is determined to be incomplete, to provide the applicant with an exhaustive list of items that were not complete, as specified.
The Permit Streamlining Act generally requires that a public agency that is the lead agency for a development project approve or disapprove a project within 120 days from the date of certification by the lead agency of an environmental impact report prepared for certain development projects, but reduces this time period to 90 days from the certification of an environmental impact report for development projects meeting certain additional conditions relating to affordability. Existing law defines “development project” for these purposes to mean a use consisting of either residential units only or mixed-use developments consisting of residential and nonresidential uses that satisfy certain other requirements.
88 — 3 — Ch. 654
This bill, until January 1, 2025, would reduce the time period in which a lead agency under these provisions is required to approve or disapprove a project from 120 days to 90 days, for a development project generally described above, and from 90 days to 60 days, for a development project that meets the above-described affordability conditions. The bill would recast the definition of “development project” for these purposes to mean a housing development project, as defined in the Housing Accountability Act.
(4) The Planning and Zoning Law, among other things, requires the legislative body of each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city and of any land outside its boundaries that relates to its planning. That law authorizes the legislative body, if it deems it to be in the public interest, to amend all or part of an adopted general plan, as provided. That law also authorizes the legislative body of any county or city, pursuant to specified procedures, to adopt ordinances that, among other things, regulate the use of buildings, structures, and land as between industry, business, residences, open space, and other purposes.
This bill, until January 1, 2025, with respect to land where housing is an allowable use, except as specified, would prohibit a county or city, including the electorate exercising its local initiative or referendum power, in which specified conditions exist, determined by the Department of Housing and Community Development as provided, from enacting a development policy, standard, or condition, as defined, that would have the effect of (A) changing the land use designation or zoning of a parcel or parcels of property to a less intensive use or reducing the intensity of land use within an existing zoning district below what was allowed under the general plan or specific plan land use designation and zoning ordinances of the county or city as in effect on January 1, 2018; (B) imposing or enforcing a moratorium on housing development within all or a portion of the jurisdiction of the county or city, except as provided; (C) imposing or enforcing new design standards established on or after January 1, 2020, that are not objective design standards, as defined; or (D) establishing or implementing certain limits on the number of permits issued by, or the population of, the county or city, unless the limit was approved prior to January 1, 2005, in a predominantly agricultural county, as defined. The bill would, notwithstanding these prohibitions, allow a city or county to prohibit the commercial use of land zoned for residential use consistent with the authority of the city or county conferred by other law. The bill would state that these prohibitions would apply to any zoning ordinance adopted or amended on or after the effective date of these provisions, and that any development policy, standard, or condition on or after that date that does not comply would be deemed void.
This bill would also require a project that requires the demolition of housing to comply with specified requirements, including the provision of relocation assistance and a right of first refusal in the new housing to displaced occupants, as provided. The bill would provide that these provisions do not supersede any provision of a locally adopted ordinance 88 Ch. 654 — 4 —
that places greater restrictions on the demolition of residential dwelling units or that requires greater relocation assistance to displaced households.
The bill would require a county or city subject to these provisions to include information necessary to determine compliance with these provisions in the list or lists that specify the information that will be required from any applicant for a development project under the Permit Streamlining Act.
The bill would state that these prohibitions would prevail over any conflicting provision of the Planning and Zoning Law or other law regulating housing development in this state, except as specifically provided. The bill would also require that any exception to these provisions, including an exception for the health and safety of occupants of a housing development project, be construed narrowly.
(5) This bill would include findings that the changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities. (6) By imposing various new requirements and duties on local planning officials with respect to housing development, and by changing the scope of a crime under the State Housing Law, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that with regard to certain mandates no reimbursement is required by this act for a specified reason.
With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
(7) This bill would provide that its provisions are severable.
The people of the State of California do enact as follows:
SECTION 1. This act shall be known, and may be cited, as the Housing Crisis Act of 2019.
SEC. 2. (a) The Legislature finds and declares the following:
(1) California is experiencing a housing supply crisis, with housing demand far outstripping supply. In 2018, California ranked 49th out of the 50 states in housing units per capita.
(2) Consequently, existing housing in this state, especially in its largest cities, has become very expensive. Seven of the 10 most expensive real estate markets in the United States are in California. In San Francisco, the median home price is $1.6 million.
(3) California is also experiencing rapid year-over-year rent growth with three cities in the state having had overall rent growth of 10 percent or more year-over-year, and of the 50 United States cities with the highest United States rents, 33 are cities in California.
88 — 5 — Ch. 654
(4) California needs an estimated 180,000 additional homes annually to keep up with population growth, and the Governor has called for 3.5 million new homes to be built over the next 7 years.
(5) The housing crisis has particularly exacerbated the need for affordable homes at prices below market rates.
(6) The housing crisis harms families across California and has resulted in all of the following:
(A) Increased poverty and homelessness, especially first-time homelessness.
(B) Forced lower income residents into crowded and unsafe housing in urban areas.
(C) Forced families into lower cost new housing in greenfields at the urban-rural interface with longer commute times and a higher exposure to fire hazard.
(D) Forced public employees, health care providers, teachers, and others, including critical safety personnel, into more affordable housing farther from the communities they serve, which will exacerbate future disaster response challenges in high-cost, high-congestion areas and increase risk to life.
(E) Driven families out of the state or into communities away from good schools and services, making the ZIP Code where one grew up the largest determinate of later access to opportunities and social mobility, disrupting family life, and increasing health problems due to long commutes that may exceed three hours per day.
(7) The housing crisis has been exacerbated by the additional loss of units due to wildfires in 2017 and 2018, which impacts all regions of the state. The Carr Fire in 2017 alone burned over 1,000 homes, and over 50,000 people have been displaced by the Camp Fire and the Woolsey Fire in 2018.
This temporary and permanent displacement has placed additional demand on the housing market and has resulted in fewer housing units available for rent by low-income individuals.
(8) Individuals who lose their housing due to fire or the sale of the property cannot find affordable homes or rental units and are pushed into cars and tents.
(9) Costs for construction of new housing continue to increase. According to the Terner Center for Housing Innovation at the University of California, Berkeley, the cost of building a 100-unit affordable housing project in the state was almost $425,000 per unit in 2016, up from $265,000 per unit in 2000.
(10) Lengthy permitting processes and approval times, fees and costs for parking, and other requirements further exacerbate cost of residential construction.
(11) The housing crisis is severely impacting the state’s economy as follows:
(A) Employers face increasing difficulty in securing and retaining a workforce.
88 Ch. 654 — 6 —
(B) Schools, universities, nonprofits, and governments have difficulty attracting and retaining teachers, students, and employees, and our schools and critical services are suffering.
(C) According to analysts at McKinsey and Company, the housing crisis is costing California $140 billion a year in lost economic output. (12) The housing crisis also harms the environment by doing both of the following:
(A) Increasing pressure to develop the state’s farmlands, open space, and rural interface areas to build affordable housing, and increasing fire hazards that generate massive greenhouse gas emissions.
(B) Increasing greenhouse gas emissions from longer commutes to affordable homes far from growing job centers.
(13) Homes, lots, and structures near good jobs, schools, and transportation remain underutilized throughout the state and could be rapidly remodeled or developed to add affordable homes without subsidy where they are needed with state assistance.
(14) Reusing existing infrastructure and developed properties, and building more smaller homes with good access to schools, parks, and services, will provide the most immediate help with the lowest greenhouse gas footprint to state residents.
(b) In light of the foregoing, the Legislature hereby declares a statewide housing emergency, to be in effect until January 1, 2025. (c) It is the intent of the Legislature, in enacting the Housing Crisis Act of 2019, to do both of the following:
(1) Suspend certain restrictions on the development of new housing during the period of the statewide emergency described in subdivisions (a) and (b).
(2) Work with local governments to expedite the permitting of housing in regions suffering the worst housing shortages and highest rates of displacement.
SEC. 3. Section 65589.5 of the Government Code is amended to read:
65589.5. (a) (1) The Legislature finds and declares all of the following:
(A) The lack of housing, including emergency shelters, is a critical problem that threatens the economic, environmental, and social quality of life in California.
(B) California housing has become the most expensive in the nation. The excessive cost of the state’s housing supply is partially caused by activities and policies of many local governments that limit the approval of housing, increase the cost of land for housing, and require that high fees and exactions be paid by producers of housing.
(C) Among the consequences of those actions are discrimination against low-income and minority households, lack of housing to support employment growth, imbalance in jobs and housing, reduced mobility, urban sprawl, excessive commuting, and air quality deterioration.
(D) Many local governments do not give adequate attention to the economic, environmental, and social costs of decisions that result in 88 — 7 — Ch. 654
disapproval of housing development projects, reduction in density of housing projects, and excessive standards for housing development projects. (2) In enacting the amendments made to this section by the act adding this paragraph, the Legislature further finds and declares the following:
(A) California has a housing supply and affordability crisis of historic proportions. The consequences of failing to effectively and aggressively confront this crisis are hurting millions of Californians, robbing future generations of the chance to call California home, stifling economic opportunities for workers and businesses, worsening poverty and homelessness, and undermining the state’s environmental and climate objectives.
(B) While the causes of this crisis are multiple and complex, the absence of meaningful and effective policy reforms to significantly enhance the approval and supply of housing affordable to Californians of all income levels is a key factor.
(C) The crisis has grown so acute in California that supply, demand, and affordability fundamentals are characterized in the negative: underserved demands, constrained supply, and protracted unaffordability. (D) According to reports and data, California has accumulated an unmet housing backlog of nearly 2,000,000 units and must provide for at least 180,000 new units annually to keep pace with growth through 2025. (E) California’s overall homeownership rate is at its lowest level since the 1940s. The state ranks 49th out of the 50 states in homeownership rates as well as in the supply of housing per capita. Only one-half of California’s households are able to afford the cost of housing in their local regions. (F) Lack of supply and rising costs are compounding inequality and limiting advancement opportunities for many Californians. (G) The majority of California renters, more than 3,000,000 households, pay more than 30 percent of their income toward rent and nearly one-third, more than 1,500,000 households, pay more than 50 percent of their income toward rent.
(H) When Californians have access to safe and affordable housing, they have more money for food and health care; they are less likely to become homeless and in need of government-subsidized services; their children do better in school; and businesses have an easier time recruiting and retaining employees.
(I) An additional consequence of the state’s cumulative housing shortage is a significant increase in greenhouse gas emissions caused by the displacement and redirection of populations to states with greater housing opportunities, particularly working- and middle-class households.
California’s cumulative housing shortfall therefore has not only national but international environmental consequences.
(J) California’s housing picture has reached a crisis of historic proportions despite the fact that, for decades, the Legislature has enacted numerous statutes intended to significantly increase the approval, development, and affordability of housing for all income levels, including this section. 88 Ch. 654 — 8 —
(K) The Legislature’s intent in enacting this section in 1982 and in expanding its provisions since then was to significantly increase the approval and construction of new housing for all economic segments of California’s communities by meaningfully and effectively curbing the capability of local governments to deny, reduce the density for, or render infeasible housing development projects and emergency shelters. That intent has not been fulfilled.
(L) It is the policy of the state that this section be interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.
(3) It is the intent of the Legislature that the conditions that would have a specific, adverse impact upon the public health and safety, as described in paragraph (2) of subdivision (d) and paragraph (1) of subdivision (j), arise infrequently.
(b) It is the policy of the state that a local government not reject or make infeasible housing development projects, including emergency shelters, that contribute to meeting the need determined pursuant to this article without a thorough analysis of the economic, social, and environmental effects of the action and without complying with subdivision (d).
(c) The Legislature also recognizes that premature and unnecessary development of agricultural lands for urban uses continues to have adverse effects on the availability of those lands for food and fiber production and on the economy of the state. Furthermore, it is the policy of the state that development should be guided away from prime agricultural lands; therefore, in implementing this section, local jurisdictions should encourage, to the maximum extent practicable, in filling existing urban areas. (d) A local agency shall not disapprove a housing development project, including farmworker housing as defined in subdivision (h) of Section 50199.7 of the Health and Safety Code, for very low, low-, or moderate-income households, or an emergency shelter, or condition approval in a manner that renders the housing development project infeasible for development for the use of very low, low-, or moderate-income households, or an emergency shelter, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of the following:
(1) The jurisdiction has adopted a housing element pursuant to this article that has been revised in accordance with Section 65588, is in substantial compliance with this article, and the jurisdiction has met or exceeded its share of the regional housing need allocation pursuant to Section 65584 for the planning period for the income category proposed for the housing development project, provided that any disapproval or conditional approval shall not be based on any of the reasons prohibited by Section 65008. If the housing development project includes a mix of income categories, and the jurisdiction has not met or exceeded its share of the regional housing need for one or more of those categories, then this paragraph shall not be used to disapprove or conditionally approve the housing development project.
The share of the regional housing need met by the jurisdiction shall be 88 — 9 — Ch. 654
calculated consistently with the forms and definitions that may be adopted by the Department of Housing and Community Development pursuant to Section 65400. In the case of an emergency shelter, the jurisdiction shall have met or exceeded the need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. Any disapproval or conditional approval pursuant to this paragraph shall be in accordance with applicable law, rule, or standards.
(2) The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to lowand moderate-income households or rendering the development of the emergency shelter financially infeasible. As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. Inconsistency with the zoning ordinance or general plan land use designation shall not constitute a specific, adverse impact upon the public health or safety.
(3) The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. (4) The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
(5) The housing development project or emergency shelter is inconsistent with both the jurisdiction’s zoning ordinance and general plan land use designation as specified in any element of the general plan as it existed on the date the application was deemed complete, and the jurisdiction has adopted a revised housing element in accordance with Section 65588 that is in substantial compliance with this article. For purposes of this section, a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete shall not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(A) This paragraph cannot be utilized to disapprove or conditionally approve a housing development project if the housing development project is proposed on a site that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdiction’s housing element, and consistent with the density specified in the housing element, even though it is inconsistent with both the jurisdiction’s zoning ordinance and general plan land use designation.
88 Ch. 654 — 10 —
(B) If the local agency has failed to identify in the inventory of land in its housing element sites that can be developed for housing within the planning period and are sufficient to provide for the jurisdiction’s share of the regional housing need for all income levels pursuant to Section 65584, then this paragraph shall not be utilized to disapprove or conditionally approve a housing development project proposed for a site designated in any element of the general plan for residential uses or designated in any element of the general plan for commercial uses if residential uses are permitted or conditionally permitted within commercial designations. In any action in court, the burden of proof shall be on the local agency to show that its housing element does identify adequate sites with appropriate zoning and development standards and with services and facilities to accommodate the local agency’s share of the regional housing need for the very low, low-, and moderate-income categories.
(C) If the local agency has failed to identify a zone or zones where emergency shelters are allowed as a permitted use without a conditional use or other discretionary permit, has failed to demonstrate that the identified zone or zones include sufficient capacity to accommodate the need for emergency shelter identified in paragraph (7) of subdivision (a) of Section 65583, or has failed to demonstrate that the identified zone or zones can accommodate at least one emergency shelter, as required by paragraph (4) of subdivision (a) of Section 65583, then this paragraph shall not be utilized to disapprove or conditionally approve an emergency shelter proposed for a site designated in any element of the general plan for industrial, commercial, or multifamily residential uses. In any action in court, the burden of proof shall be on the local agency to show that its housing element does satisfy the requirements of paragraph (4) of subdivision (a) of Section 65583.
(e) Nothing in this section shall be construed to relieve the local agency from complying with the congestion management program required by Chapter 2.6 (commencing with Section 65088) of Division 1 of Title 7 or the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). Neither shall anything in this section be construed to relieve the local agency from making one or more of the findings required pursuant to Section 21081 of the Public Resources Code or otherwise complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(f) (1) Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring the housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdiction’s share of the regional housing need pursuant to Section 65584. However, the development standards, conditions, and policies shall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development. 88 — 11 — Ch. 654
(2) Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring an emergency shelter project to comply with objective, quantifiable, written development standards, conditions, and policies that are consistent with paragraph (4) of subdivision (a) of Section 65583 and appropriate to, and consistent with, meeting the jurisdiction’s need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. However, the development standards, conditions, and policies shall be applied by the local agency to facilitate and accommodate the development of the emergency shelter project.
(3) Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from imposing fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the housing development project or emergency shelter.
(4) For purposes of this section, a housing development project or emergency shelter shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project or emergency shelter is consistent, compliant, or in conformity. (g) This section shall be applicable to charter cities because the Legislature finds that the lack of housing, including emergency shelter, is a critical statewide problem.
(h) The following definitions apply for the purposes of this section:
(1) “Feasible” means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.
(2) “Housing development project” means a use consisting of any of the following:
(A) Residential units only.
(B) Mixed-use developments consisting of residential and nonresidential uses with at least two-thirds of the square footage designated for residential use.
(C) Transitional housing or supportive housing.
(3) “Housing for very low, low-, or moderate-income households” means that either (A) at least 20 percent of the total units shall be sold or rented to lower income households, as defined in Section 50079.5 of the Health and Safety Code, or (B) 100 percent of the units shall be sold or rented to persons and families of moderate income as defined in Section 50093 of the Health and Safety Code, or persons and families of middle income, as defined in Section 65008 of this code. Housing units targeted for lower income households shall be made available at a monthly housing cost that does not exceed 30 percent of 60 percent of area median income with adjustments for household size made in accordance with the adjustment factors on which the lower income eligibility limits are based. Housing units targeted for persons and families of moderate income shall be made available at a 88 Ch. 654 — 12 —
monthly housing cost that does not exceed 30 percent of 100 percent of area median income with adjustments for household size made in accordance with the adjustment factors on which the moderate-income eligibility limits are based.
(4) “Area median income” means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code. The developer shall provide sufficient legal commitments to ensure continued availability of units for very low or low-income households in accordance with the provisions of this subdivision for 30 years.
(5) Notwithstanding any other law, until January 1, 2025, “deemed complete” means that the applicant has submitted a preliminary application pursuant to Section 65941.1.
(6) “Disapprove the housing development project” includes any instance in which a local agency does either of the following:
(A) Votes on a proposed housing development project application and the application is disapproved, including any required land use approvals or entitlements necessary for the issuance of a building permit. (B) Fails to comply with the time periods specified in subdivision (a) of Section 65950. An extension of time pursuant to Article 5 (commencing with Section 65950) shall be deemed to be an extension of time pursuant to this paragraph.
(7) “Lower density” includes any conditions that have the same effect or impact on the ability of the project to provide housing. (8) Until January 1, 2025, “objective” means involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.
(9) Notwithstanding any other law, until January 1, 2025, “determined to be complete” means that the applicant has submitted a complete application pursuant to Section 65943.
(i) If any city, county, or city and county denies approval or imposes conditions, including design changes, lower density, or a reduction of the percentage of a lot that may be occupied by a building or structure under the applicable planning and zoning in force at the time the housing development project’s application is deemed complete, that have a substantial adverse effect on the viability or affordability of a housing development for very low, low-, or moderate-income households, and the denial of the development or the imposition of conditions on the development is the subject of a court action which challenges the denial or the imposition of conditions, then the burden of proof shall be on the local legislative body to show that its decision is consistent with the findings as described in subdivision (d), and that the findings are supported by a preponderance of the evidence in the record, and with the requirements of subdivision (o). (j) (1) When a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and 88 — 13 — Ch. 654
criteria, including design review standards, in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:
(A) The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density.
As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. (B) There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density. (2) (A) If the local agency considers a proposed housing development project to be inconsistent, not in compliance, or not in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision as specified in this subdivision, it shall provide the applicant with written documentation identifying the provision or provisions, and an explanation of the reason or reasons it considers the housing development to be inconsistent, not in compliance, or not in conformity as follows:
(i) Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units. (ii) Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.
(B) If the local agency fails to provide the required documentation pursuant to subparagraph (A), the housing development project shall be deemed consistent, compliant, and in conformity with the applicable plan, program, policy, ordinance, standard, requirement, or other similar provision. (3) For purposes of this section, the receipt of a density bonus pursuant to Section 65915 shall not constitute a valid basis on which to find a proposed housing development project is inconsistent, not in compliance, or not in conformity, with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision specified in this subdivision. (4) For purposes of this section, a proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan. If the local agency has complied with paragraph (2), the local agency may require the proposed 88 Ch. 654 — 14 —
housing development project to comply with the objective standards and criteria of the zoning which is consistent with the general plan, however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
(k) (1) (A) (i) The applicant, a person who would be eligible to apply for residency in the development or emergency shelter, or a housing organization may bring an action to enforce this section. If, in any action brought to enforce this section, a court finds that any of the following are met, the court shall issue an order pursuant to clause (ii):
(I) The local agency, in violation of subdivision (d), disapproved a housing development project or conditioned its approval in a manner rendering it infeasible for the development of an emergency shelter, or housing for very low, low-, or moderate-income households, including farmworker housing, without making the findings required by this section or without making findings supported by a preponderance of the evidence. (II) The local agency, in violation of subdivision (j), disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or imposed a condition that the project be developed at a lower density, without making the findings required by this section or without making findings supported by a preponderance of the evidence.
(III) (ia) Subject to sub-subclause (ib), the local agency, in violation of subdivision (o), required or attempted to require a housing development project to comply with an ordinance, policy, or standard not adopted and in effect when a preliminary application was submitted. (ib) This subclause shall become inoperative on January 1, 2025. (ii) If the court finds that one of the conditions in clause (i) is met, the court shall issue an order or judgment compelling compliance with this section within 60 days, including, but not limited to, an order that the local agency take action on the housing development project or emergency shelter.
The court may issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section. The court shall retain jurisdiction to ensure that its order or judgment is carried out and shall award reasonable attorney’s fees and costs of suit to the plaintiff or petitioner, except under extraordinary circumstances in which the court finds that awarding fees would not further the purposes of this section.
(B) (i) Upon a determination that the local agency has failed to comply with the order or judgment compelling compliance with this section within 60 days issued pursuant to subparagraph (A), the court shall impose fines on a local agency that has violated this section and require the local agency to deposit any fine levied pursuant to this subdivision into a local housing trust fund. The local agency may elect to instead deposit the fine into the Building Homes and Jobs Fund, if Senate Bill 2 of the 2017–18 Regular 88 — 15 — Ch. 654
Session is enacted, or otherwise in the Housing Rehabilitation Loan Fund.
The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943. In determining the amount of fine to impose, the court shall consider the local agency’s progress in attaining its target allocation of the regional housing need pursuant to Section 65584 and any prior violations of this section. Fines shall not be paid out of funds already dedicated to affordable housing, including, but not limited to, Low and Moderate Income Housing Asset Funds, funds dedicated to housing for very low, low-, and moderate-income households, and federal HOME Investment Partnerships Program and Community Development Block Grant Program funds. The local agency shall commit and expend the money in the local housing trust fund within five years for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households. After five years, if the funds have not been expended, the money shall revert to the state and be deposited in the Building Homes and Jobs Fund, if Senate Bill 2 of the 2017–18 Regular Session is enacted, or otherwise in the Housing Rehabilitation Loan Fund, for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households.
(ii) If any money derived from a fine imposed pursuant to this subparagraph is deposited in the Housing Rehabilitation Loan Fund, then, notwithstanding Section 50661 of the Health and Safety Code, that money shall be available only upon appropriation by the Legislature. (C) If the court determines that its order or judgment has not been carried out within 60 days, the court may issue further orders as provided by law to ensure that the purposes and policies of this section are fulfilled, including, but not limited to, an order to vacate the decision of the local agency and to approve the housing development project, in which case the application for the housing development project, as proposed by the applicant at the time the local agency took the initial action determined to be in violation of this section, along with any standard conditions determined by the court to be generally imposed by the local agency on similar projects, shall be deemed to be approved unless the applicant consents to a different decision or action by the local agency.
(2) For purposes of this subdivision, “housing organization” means a trade or industry group whose local members are primarily engaged in the construction or management of housing units or a nonprofit organization whose mission includes providing or advocating for increased access to housing for low-income households and have filed written or oral comments with the local agency prior to action on the housing development project.
A housing organization may only file an action pursuant to this section to challenge the disapproval of a housing development by a local agency. A housing organization shall be entitled to reasonable attorney’s fees and costs if it is the prevailing party in an action to enforce this section. 88 Ch. 654 — 16 —
(l) If the court finds that the local agency (1) acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section and (2) failed to carry out the court’s order or judgment within 60 days as described in subdivision (k), the court, in addition to any other remedies provided by this section, shall multiply the fine determined pursuant to subparagraph (B) of paragraph (1) of subdivision (k) by a factor of five. For purposes of this section, “bad faith” includes, but is not limited to, an action that is frivolous or otherwise entirely without merit.
(m) Any action brought to enforce the provisions of this section shall be brought pursuant to Section 1094.5 of the Code of Civil Procedure, and the local agency shall prepare and certify the record of proceedings in accordance with subdivision (c) of Section 1094.6 of the Code of Civil Procedure no later than 30 days after the petition is served, provided that the cost of preparation of the record shall be borne by the local agency, unless the petitioner elects to prepare the record as provided in subdivision (n) of this section. A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h). Upon entry of the trial court’s order, a party may, in order to obtain appellate review of the order, file a petition within 20 days after service upon it of a written notice of the entry of the order, or within such further time not exceeding an additional 20 days as the trial court may for good cause allow, or may appeal the judgment or order of the trial court under Section 904.1 of the Code of Civil Procedure. If the local agency appeals the judgment of the trial court, the local agency shall post a bond, in an amount to be determined by the court, to the benefit of the plaintiff if the plaintiff is the project applicant.
(n) In any action, the record of the proceedings before the local agency shall be filed as expeditiously as possible and, notwithstanding Section 1094.6 of the Code of Civil Procedure or subdivision (m) of this section, all or part of the record may be prepared (1) by the petitioner with the petition or petitioner’s points and authorities, (2) by the respondent with respondent’s points and authorities, (3) after payment of costs by the petitioner, or (4) as otherwise directed by the court. If the expense of preparing the record has been borne by the petitioner and the petitioner is the prevailing party, the expense shall be taxable as costs.
(o) (1) Subject to paragraphs (2), (6), and (7), and subdivision (d) of Section 65941.1, a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.
(2) Paragraph (1) shall not prohibit a housing development project from being subject to ordinances, policies, and standards adopted after the 88 — 17 — Ch. 654
preliminary application was submitted pursuant to Section 65941.1 in the following circumstances:
(A) In the case of a fee, charge, or other monetary exaction, to an increase resulting from an automatic annual adjustment based on an independently published cost index that is referenced in the ordinance or resolution establishing the fee or other monetary exaction.
(B) A preponderance of the evidence in the record establishes that subjecting the housing development project to an ordinance, policy, or standard beyond those in effect when a preliminary application was submitted is necessary to mitigate or avoid a specific, adverse impact upon the public health or safety, as defined in subparagraph (A) of paragraph (1) of subdivision (j), and there is no feasible alternative method to satisfactorily mitigate or avoid the adverse impact.
(C) Subjecting the housing development project to an ordinance, policy, standard, or any other measure, beyond those in effect when a preliminary application was submitted is necessary to avoid or substantially lessen an impact of the project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(D) The housing development project has not commenced construction within two and one-half years following the date that the project received final approval. For purposes of this subparagraph, “final approval” means that the housing development project has received all necessary approvals to be eligible to apply for, and obtain, a building permit or permits and either of the following is met:
(i) The expiration of all applicable appeal periods, petition periods, reconsideration periods, or statute of limitations for challenging that final approval without an appeal, petition, request for reconsideration, or legal challenge having been filed.
(ii) If a challenge is filed, that challenge is fully resolved or settled in favor of the housing development project.
(E) The housing development project is revised following submittal of a preliminary application pursuant to Section 65941.1 such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision. For purposes of this subdivision, “square footage of construction” means the building area, as defined by the California Building Standards Code (Title 24 of the California Code of Regulations).
(3) This subdivision does not prevent a local agency from subjecting the additional units or square footage of construction that result from project revisions occurring after a preliminary application is submitted pursuant to Section 65941.1 to the ordinances, policies, and standards adopted and in effect when the preliminary application was submitted.
(4) For purposes of this subdivision, “ordinances, policies, and standards” includes general plan, community plan, specific plan, zoning, design review standards and criteria, subdivision standards and criteria, and any other 88 Ch. 654 — 18 —
rules, regulations, requirements, and policies of a local agency, as defined in Section 66000, including those relating to development impact fees, capacity or connection fees or charges, permit or processing fees, and other exactions.
(5) This subdivision shall not be construed in a manner that would lessen the restrictions imposed on a local agency, or lessen the protections afforded to a housing development project, that are established by any other law, including any other part of this section.
(6) This subdivision shall not restrict the authority of a public agency or local agency to require mitigation measures to lessen the impacts of a housing development project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(7) With respect to completed residential units for which the project approval process is complete and a certificate of occupancy has been issued, nothing in this subdivision shall limit the application of later enacted ordinances, policies, and standards that regulate the use and occupancy of those residential units, such as ordinances relating to rental housing inspection, rent stabilization, restrictions on short-term renting, and business licensing requirements for owners of rental housing.
(8) This subdivision shall become inoperative on January 1, 2025. (p) This section shall be known, and may be cited, as the Housing Accountability Act.
SEC. 4. Section 65905.5 is added to the Government Code, to read:
65905.5. (a) Notwithstanding any other law, if a proposed housing development project complies with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete, after the application is deemed complete, a city, county, or city and county shall not conduct more than five hearings pursuant to Section 65905, or any other law, ordinance, or regulation requiring a public hearing in connection with the approval of that housing development project. If the city, county, or city and county continues a hearing subject to this section to another date, the continued hearing shall count as one of the five hearings allowed under this section. The city, county, or city and county shall consider and either approve or disapprove the application at any of the five hearings allowed under this section consistent with the applicable timelines under the Permit Streamlining Act (Chapter 4.5 (commencing with Section 65920)). (b) For purposes of this section:
(1) “Deemed complete” means that the application has met all of the requirements specified in the relevant list compiled pursuant to Section 65940 that was available at the time when the application was submitted. (2) “Hearing” includes any public hearing, workshop, or similar meeting conducted by the city or county with respect to the housing development project, whether by the legislative body of the city or county, the planning agency established pursuant to Section 65100, or any other agency, department, board, commission, or any other designated hearing officer or body of the city or county, or any committee or subcommittee thereof. 88 — 19 — Ch. 654
“Hearing” does not include a hearing to review a legislative approval required for a proposed housing development project, including, but not limited to, a general plan amendment, a specific plan adoption or amendment, or a zoning amendment, or any hearing arising from a timely appeal of the approval or disapproval of a legislative approval.
(3) “Housing development project” has the same meaning as defined in paragraph (2) of subdivision (h) of Section 65589.5.
(c) (1) For purposes of this section, a housing development project shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project is consistent, compliant, or in conformity.
(2) A proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria, but the zoning for the project site is inconsistent with the general plan. If the local agency complies with the written documentation requirements of paragraph (2) of subdivision (j) of Section 65589.5, the local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning that is consistent with the general plan; however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
(d) Nothing in this section supersedes, limits, or otherwise modifies the requirements of, or the standards of review pursuant to, Division 13 (commencing with Section 21000) of the Public Resources Code. (e) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 5. Section 65913.10 is added to the Government Code, to read:
65913.10. (a) For purposes of any state or local law, ordinance, or regulation that requires the city or county to determine whether the site of a proposed housing development project is a historic site, the city or county shall make that determination at the time the application for the housing development project is deemed complete. A determination as to whether a parcel of property is a historic site shall remain valid during the pendency of the housing development project for which the application was made unless any archaeological, paleontological, or tribal cultural resources are encountered during any grading, site disturbance, or building alteration activities.
(b) For purposes of this section:
(1) “Deemed complete” means that the application has met all of the requirements specified in the relevant list compiled pursuant to Section 65940 that was available at the time when the application was submitted. (2) “Housing development project” has the same meaning as defined in paragraph (2) of subdivision (h) of Section 65589.5.
88 Ch. 654 — 20 —
(c) (1) Nothing in this section supersedes, limits, or otherwise modifies the requirements of, or the standards of review pursuant to, Division 13 (commencing with Section 21000) of the Public Resources Code. (2) Nothing in this section supersedes, limits, or otherwise modifies the requirements of the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). (d) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 6. Section 65940 of the Government Code is amended to read:
65940. (a) (1) Each public agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a development project. Each public agency shall revise the list of information required from an applicant to include a certification of compliance with Section 65962.5, and the statement of application required by Section 65943. Copies of the information, including the statement of application required by Section 65943, shall be made available to all applicants for development projects and to any person who requests the information.
(2) An affected city or affected county, as defined in Section 66300, shall include the information necessary to determine compliance with the requirements of subdivision (d) of Section 66300 in the list compiled pursuant to paragraph (1).
(b) The list of information required from any applicant shall include, where applicable, identification of whether the proposed project is located within 1,000 feet of a military installation, beneath a low-level flight path or within special use airspace as defined in Section 21098 of the Public Resources Code, and within an urbanized area as defined in Section 65944. (c) (1) A public agency that is not beneath a low-level flight path or not within special use airspace and does not contain a military installation is not required to change its list of information required from applicants to comply with subdivision (b).
(2) A public agency that is entirely urbanized, as defined in subdivision (e) of Section 65944, with the exception of a jurisdiction that contains a military installation, is not required to change its list of information required from applicants to comply with subdivision (b).
(d) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 7. Section 65940 is added to the Government Code, to read:
65940. (a) Each public agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a development project. Each public agency shall revise the list of information required from an applicant to include a certification of compliance with Section 65962.5, and the statement of application required by Section 65943. Copies of the information, including the statement of application required by Section 65943, shall be made available to all applicants for development projects and to any person who requests the information.
88 — 21 — Ch. 654
(b) The list of information required from any applicant shall include, where applicable, identification of whether the proposed project is located within 1,000 feet of a military installation, beneath a low-level flight path or within special use airspace as defined in Section 21098 of the Public Resources Code, and within an urbanized area as defined in Section 65944. (c) (1) A public agency that is not beneath a low-level flight path or not within special use airspace and does not contain a military installation is not required to change its list of information required from applicants to comply with subdivision (b).
(2) A public agency that is entirely urbanized, as defined in subdivision (e) of Section 65944, with the exception of a jurisdiction that contains a military installation, is not required to change its list of information required from applicants to comply with subdivision (b).
(d) This section shall become operative on January 1, 2025.
SEC. 8. Section 65941.1 is added to the Government Code, to read:
65941.1. (a) An applicant for a housing development project, as defined in paragraph (2) of subdivision (h) of Section 65589.5, shall be deemed to have submitted a preliminary application upon providing all of the following information about the proposed project to the city, county, or city and county from which approval for the project is being sought and upon payment of the permit processing fee:
(1) The specific location, including parcel numbers, a legal description, and site address, if applicable.
(2) The existing uses on the project site and identification of major physical alterations to the property on which the project is to be located. (3) A site plan showing the location on the property, elevations showing design, color, and material, and the massing, height, and approximate square footage, of each building that is to be occupied.
(4) The proposed land uses by number of units and square feet of residential and nonresidential development using the categories in the applicable zoning ordinance.
(5) The proposed number of parking spaces.
(6) Any proposed point sources of air or water pollutants. (7) Any species of special concern known to occur on the property. (8) Whether a portion of the property is located within any of the following:
(A) A very high fire hazard severity zone, as determined by the Department of Forestry and Fire Protection pursuant to Section 51178. (B) Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C) A hazardous waste site that is listed pursuant to Section 65962.5 or a hazardous waste site designated by the Department of Toxic Substances Control pursuant to Section 25356 of the Health and Safety Code. (D) A special flood hazard area subject to inundation by the 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency.
88 Ch. 654 — 22 —
(E) A delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the development complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2.
(F) A stream or other resource that may be subject to a streambed alteration agreement pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(9) Any historic or cultural resources known to exist on the property. (10) The number of proposed below market rate units and their affordability levels.
(11) The number of bonus units and any incentives, concessions, waivers, or parking reductions requested pursuant to Section 65915. (12) Whether any approvals under the Subdivision Map Act, including, but not limited to, a parcel map, a tentative map, or a condominium map, are being requested.
(13) The applicant’s contact information and, if the applicant does not own the property, consent from the property owner to submit the application. (14) For a housing development project proposed to be located within the coastal zone, whether any portion of the property contains any of the following:
(A) Wetlands, as defined in subdivision (b) of Section 13577 of Title 14 of the California Code of Regulations.
(B) Environmentally sensitive habitat areas, as defined in Section 30240 of the Public Resources Code.
(C) A tsunami run-up zone.
(D) Use of the site for public access to or along the coast. (15) The number of existing residential units on the project site that will be demolished and whether each existing unit is occupied or unoccupied. (16) A site map showing a stream or other resource that may be subject to a streambed alteration agreement pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code and an aerial site photograph showing existing site conditions of environmental site features that would be subject to regulations by a public agency, including creeks and wetlands.
(17) The location of any recorded public easement, such as easements for storm drains, water lines, and other public rights of way. (b) (1) Each local agency shall compile a checklist and application form that applicants for housing development projects may use for the purpose of satisfying the requirements for submittal of a preliminary application. (2) The Department of Housing and Community Development shall adopt a standardized form that applicants for housing development projects may use for the purpose of satisfying the requirements for submittal of a preliminary application if a local agency has not developed its own 88 — 23 — Ch. 654
application form pursuant to paragraph (1). Adoption of the standardized form shall not be subject to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code. (3) A checklist or form shall not require or request any information beyond that expressly identified in subdivision (a).
(c) After submittal of all of the information required by subdivision (a), if the development proponent revises the project such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision, the housing development project shall not be deemed to have submitted a preliminary application that satisfies this section until the development proponent resubmits the information required by subdivision (a) so that it reflects the revisions. For purposes of this subdivision, “square footage of construction” means the building area, as defined by the California Building Standards Code (Title 24 of the California Code of Regulations).
(d) (1) Within 180 calendar days after submitting a preliminary application with all of the information required by subdivision (a) to a city, county, or city and county, the development proponent shall submit an application for a development project that includes all of the information required to process the development application consistent with Sections 65940, 65941, and 65941.5.
(2) If the public agency determines that the application for the development project is not complete pursuant to Section 65943, the development proponent shall submit the specific information needed to complete the application within 90 days of receiving the agency’s written identification of the necessary information. If the development proponent does not submit this information within the 90-day period, then the preliminary application shall expire and have no further force or effect. (3) This section shall not require an affirmative determination by a city, county, or city and county regarding the completeness of a preliminary application or a development application for purposes of compliance with this section.
(e) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 9. Section 65943 of the Government Code is amended to read:
65943. (a) Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete and shall immediately transmit the determination to the applicant for the development project. If the application is determined to be incomplete, the lead agency shall provide the applicant with an exhaustive list of items that were not complete. That list shall be limited to those items actually required on the lead agency’s submittal requirement checklist. In any subsequent review of the application determined to be incomplete, the local agency shall not request the applicant to provide any new information that was not stated in the initial list of items that were not complete. If the written determination is not made within 30 88 Ch. 654 — 24 —
days after receipt of the application, and the application includes a statement that it is an application for a development permit, the application shall be deemed complete for purposes of this chapter. Upon receipt of any resubmittal of the application, a new 30-day period shall begin, during which the public agency shall determine the completeness of the application. If the application is determined not to be complete, the agency’s determination shall specify those parts of the application which are incomplete and shall indicate the manner in which they can be made complete, including a list and thorough description of the specific information needed to complete the application. The applicant shall submit materials to the public agency in response to the list and description.
(b) Not later than 30 calendar days after receipt of the submitted materials described in subdivision (a), the public agency shall determine in writing whether the application as supplemented or amended by the submitted materials is complete and shall immediately transmit that determination to the applicant. In making this determination, the public agency is limited to determining whether the application as supplemented or amended includes the information required by the list and a thorough description of the specific information needed to complete the application required by subdivision (a).
If the written determination is not made within that 30-day period, the application together with the submitted materials shall be deemed complete for purposes of this chapter.
(c) If the application together with the submitted materials are determined not to be complete pursuant to subdivision (b), the public agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. A city or county shall provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
There shall be a final written determination by the agency on the appeal not later than 60 calendar days after receipt of the applicant’s written appeal.
The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 60-day period. Notwithstanding a decision pursuant to subdivision (b) that the application and submitted materials are not complete, if the final written determination on the appeal is not made within that 60-day period, the application with the submitted materials shall be deemed complete for the purposes of this chapter. (d) Nothing in this section precludes an applicant and a public agency from mutually agreeing to an extension of any time limit provided by this section.
(e) A public agency may charge applicants a fee not to exceed the amount reasonably necessary to provide the service required by this section. If a fee is charged pursuant to this section, the fee shall be collected as part of the application fee charged for the development permit.
(f) Each city and each county shall make copies of any list compiled pursuant to Section 65940 with respect to information required from an applicant for a housing development project, as that term is defined in 88 — 25 — Ch. 654
paragraph (2) of subdivision (h) of Section 65589.5, available both (1) in writing to those persons to whom the agency is required to make information available under subdivision (a) of that section, and (2) publicly available on the internet website of the city or county.
(g) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 10. Section 65943 is added to the Government Code, to read:
65943. (a) Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete and shall immediately transmit the determination to the applicant for the development project. If the written determination is not made within 30 days after receipt of the application, and the application includes a statement that it is an application for a development permit, the application shall be deemed complete for purposes of this chapter. Upon receipt of any resubmittal of the application, a new 30-day period shall begin, during which the public agency shall determine the completeness of the application. If the application is determined not to be complete, the agency’s determination shall specify those parts of the application which are incomplete and shall indicate the manner in which they can be made complete, including a list and thorough description of the specific information needed to complete the application. The applicant shall submit materials to the public agency in response to the list and description. (b) Not later than 30 calendar days after receipt of the submitted materials, the public agency shall determine in writing whether they are complete and shall immediately transmit that determination to the applicant. If the written determination is not made within that 30-day period, the application together with the submitted materials shall be deemed complete for purposes of this chapter.
(c) If the application together with the submitted materials are determined not to be complete pursuant to subdivision (b), the public agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. A city or county shall provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
There shall be a final written determination by the agency on the appeal not later than 60 calendar days after receipt of the applicant’s written appeal.
The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 60-day period. Notwithstanding a decision pursuant to subdivision (b) that the application and submitted materials are not complete, if the final written determination on the appeal is not made within that 60-day period, the application with the submitted materials shall be deemed complete for the purposes of this chapter. (d) Nothing in this section precludes an applicant and a public agency from mutually agreeing to an extension of any time limit provided by this section.
88 Ch. 654 — 26 —
(e) A public agency may charge applicants a fee not to exceed the amount reasonably necessary to provide the service required by this section. If a fee is charged pursuant to this section, the fee shall be collected as part of the application fee charged for the development permit.
(f) This section shall become operative on January 1, 2025.
SEC. 11. Section 65950 of the Government Code is amended to read:
65950. (a) A public agency that is the lead agency for a development project shall approve or disapprove the project within whichever of the following periods is applicable:
(1) One hundred eighty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for the development project.
(2) Ninety days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c).
(3) Sixty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c) and all of the following conditions are met:
(A) At least 49 percent of the units in the development project are affordable to very low or low-income households, as defined by Sections 50105 and 50079.5 of the Health and Safety Code, respectively. Rents for the lower income units shall be set at an affordable rent, as that term is defined in Section 50053 of the Health and Safety Code, for at least 30 years. Owner-occupied units shall be available at an affordable housing cost, as that term is defined in Section 50052.5 of the Health and Safety Code.
(B) Prior to the application being deemed complete for the development project pursuant to Article 3 (commencing with Section 65940), the lead agency received written notice from the project applicant that an application has been made or will be made for an allocation or commitment of financing, tax credits, bond authority, or other financial assistance from a public agency or federal agency, and the notice specifies the financial assistance that has been applied for or will be applied for and the deadline for application for that assistance, the requirement that one of the approvals of the development project by the lead agency is a prerequisite to the application for or approval of the application for financial assistance, and that the financial assistance is necessary for the project to be affordable as required pursuant to subparagraph (A).
(C) There is confirmation that the application has been made to the public agency or federal agency prior to certification of the environmental impact report.
88 — 27 — Ch. 654
(4) Sixty days from the date of adoption by the lead agency of the negative declaration, if a negative declaration is completed and adopted for the development project.
(5) Sixty days from the determination by the lead agency that the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if the project is exempt from that act.
(b) This section does not preclude a project applicant and a public agency from mutually agreeing in writing to an extension of any time limit provided by this section pursuant to Section 65957.
(c) For purposes of paragraphs (2) and (3) of subdivision (a) and Section 65952, “development project” means a housing development project, as that term is defined in paragraph (2) of subdivision (h) of Section 65589.5. (d) For purposes of this section, “lead agency” and “negative declaration” have the same meaning as defined in Sections 21067 and 21064 of the Public Resources Code, respectively.
(e) This section shall remain in effect only until January 1, 2025, and as of that date is repealed.
SEC. 12. Section 65950 is added to the Government Code, to read:
65950. (a) A public agency that is the lead agency for a development project shall approve or disapprove the project within whichever of the following periods is applicable:
(1) One hundred eighty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for the development project.
(2) One hundred twenty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c). (3) Ninety days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c) and all of the following conditions are met:
(A) At least 49 percent of the units in the development project are affordable to very low or low-income households, as defined by Sections 50105 and 50079.5 of the Health and Safety Code, respectively. Rents for the lower income units shall be set at an affordable rent, as that term is defined in Section 50053 of the Health and Safety Code, for at least 30 years. Owner-occupied units shall be available at an affordable housing cost, as that term is defined in Section 50052.5 of the Health and Safety Code.
(B) Prior to the application being deemed complete for the development project pursuant to Article 3 (commencing with Section 65940), the lead agency received written notice from the project applicant that an application has been made or will be made for an allocation or commitment of financing, 88 Ch. 654 — 28 —
tax credits, bond authority, or other financial assistance from a public agency or federal agency, and the notice specifies the financial assistance that has been applied for or will be applied for and the deadline for application for that assistance, the requirement that one of the approvals of the development project by the lead agency is a prerequisite to the application for or approval of the application for financial assistance, and that the financial assistance is necessary for the project to be affordable as required pursuant to subparagraph (A).
(C) There is confirmation that the application has been made to the public agency or federal agency prior to certification of the environmental impact report.
(4) Sixty days from the date of adoption by the lead agency of the negative declaration, if a negative declaration is completed and adopted for the development project.
(5) Sixty days from the determination by the lead agency that the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if the project is exempt from that act.
(b) This section does not preclude a project applicant and a public agency from mutually agreeing in writing to an extension of any time limit provided by this section pursuant to Section 65957.
(c) For purposes of paragraphs (2) and (3) of subdivision (a) and Section 65952, “development project” means a use consisting of either of the following:
(1) Residential units only.
(2) Mixed-use developments consisting of residential and nonresidential uses in which the nonresidential uses are less than 50 percent of the total square footage of the development and are limited to neighborhood commercial uses and to the first floor of buildings that are two or more stories. As used in this paragraph, “neighborhood commercial” means small-scale general or specialty stores that furnish goods and services primarily to residents of the neighborhood.
(d) For purposes of this section, “lead agency” and “negative declaration” have the same meaning as defined in Sections 21067 and 21064 of the Public Resources Code, respectively.
(e) This section shall become operative on January 1, 2025.
SEC. 13. Chapter 12 (commencing with Section 66300) is added to Division 1 of Title 7 of the Government Code, to read:
Chapter 12. Housing Crisis Act of 2019
66300. (a) As used in this section:
(1) (A) Except as otherwise provided in subparagraph (B), “affected city” means a city, including a charter city, that the Department of Housing and Community Development determines, pursuant to subdivision (e), is 88 — 29 — Ch. 654
in an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B) Notwithstanding subparagraph (A), “affected city” does not include any city that has a population of 5,000 or less and is not located within an urbanized area, as designated by the United States Census Bureau. (2) “Affected county” means a census designated place, based on the 2013-2017 American Community Survey 5-year Estimates, that is wholly located within the boundaries of an urbanized area, as designated by the United States Census Bureau.
(3) Notwithstanding any other law, “affected county” and “affected city” includes the electorate of an affected county or city exercising its local initiative or referendum power, whether that power is derived from the California Constitution, statute, or the charter or ordinances of the affected county or city.
(4) “Department” means the Department of Housing and Community Development.
(5) “Development policy, standard, or condition” means any of the following:
(A) A provision of, or amendment to, a general plan.
(B) A provision of, or amendment to, a specific plan.
(C) A provision of, or amendment to, a zoning ordinance. (D) A subdivision standard or criterion.
(6) “Housing development project” has the same meaning as defined in paragraph (2) of subdivision (h) of Section 65589.5.
(7) “Objective design standard” means a design standard that involve no personal or subjective judgment by a public official and is uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal of an application. (b) (1) Notwithstanding any other law except as provided in subdivision (i), with respect to land where housing is an allowable use, an affected county or an affected city shall not enact a development policy, standard, or condition that would have any of the following effects:
(A) Changing the general plan land use designation, specific plan land use designation, or zoning of a parcel or parcels of property to a less intensive use or reducing the intensity of land use within an existing general plan land use designation, specific plan land use designation, or zoning district below what was allowed under the land use designation and zoning ordinances of the affected county or affected city, as applicable, as in effect on January 1, 2018, except as otherwise provided in clause (ii) of subparagraph (B).
For purposes of this subparagraph, “less intensive use” includes, but is not limited to, reductions to height, density, or floor area ratio, new or increased open space or lot size requirements, or new or increased setback requirements, minimum frontage requirements, or maximum lot coverage limitations, or anything that would lessen the intensity of housing. (B) (i) Imposing a moratorium or similar restriction or limitation on housing development, including mixed-use development, within all or a 88 Ch. 654 — 30 —
portion of the jurisdiction of the affected county or city, other than to specifically protect against an imminent threat to the health and safety of persons residing in, or within the immediate vicinity of, the area subject to the moratorium or for projects specifically identified as existing restricted affordable housing.
(ii) The affected county or affected city, as applicable, shall not enforce a zoning ordinance imposing a moratorium or other similar restriction on or limitation of housing development until it has submitted the ordinance to, and received approval from, the department. The department shall approve a zoning ordinance submitted to it pursuant to this subparagraph only if it determines that the zoning ordinance satisfies the requirements of this subparagraph. If the department denies approval of a zoning ordinance imposing a moratorium or similar restriction or limitation on housing development as inconsistent with this subparagraph, that ordinance shall be deemed void.
(C) Imposing or enforcing design standards established on or after January 1, 2020, that are not objective design standards.
(D) Except as provided in subparagraph (E), establishing or implementing any provision that:
(i) Limits the number of land use approvals or permits necessary for the approval and construction of housing that will be issued or allocated within all or a portion of the affected county or affected city, as applicable. (ii) Acts as a cap on the number of housing units that can be approved or constructed either annually or for some other time period. (iii) Limits the population of the affected county or affected city, as applicable.
(E) Notwithstanding subparagraph (D), an affected county or affected city may enforce a limit on the number of approvals or permits or a cap on the number of housing units that can be approved or constructed if the provision of law imposing the limit was approved by voters prior to January 1, 2005, and the affected county or affected city is located in a predominantly agricultural county. For the purposes of this subparagraph, “predominantly agricultural county” means a county that meets both of the following, as determined by the most recent California Farmland Conversion Report produced by the Department of Conservation:
(i) Has more than 550,000 acres of agricultural land.
(ii) At least one-half of the county area is agricultural land. (2) Any development policy, standard, or condition enacted on or after the effective date of this section that does not comply with this section shall be deemed void.
(c) Notwithstanding subdivisions (b) and (f), an affected county or affected city may enact a development policy, standard, or condition to prohibit the commercial use of land that is designated for residential use, including, but not limited to, short-term occupancy of a residence, consistent with the authority conferred on the county or city by other law. (d) Notwithstanding any other provision of this section, both of the following shall apply:
88 — 31 — Ch. 654
(1) An affected city or an affected county shall not approve a housing development project that will require the demolition of residential dwelling units unless the project will create at least as many residential dwelling units as will be demolished.
(2) An affected city or an affected county shall not approve a housing development project that will require the demolition of occupied or vacant protected units, unless all of the following apply:
(A) (i) The project will replace all existing or demolished protected units.
(ii) Any protected units replaced pursuant to this subparagraph shall be considered in determining whether the housing development project satisfies the requirements of Section 65915 or a locally adopted requirement that requires, as a condition of the development of residential rental units, that the project provide a certain percentage of residential rental units affordable to, and occupied by, households with incomes that do not exceed the limits for moderate-income, lower income, very low income, or extremely low income households, as specified in Sections 50079.5, 50093, 50105, and 50106 of the Health and Safety Code.
(iii) Notwithstanding clause (i), in the case of a protected unit that is or was, within the five-year period preceding the application, subject to a form of rent or price control through a local government’s valid exercise of its police power, and that is or was occupied by persons or families above lower income, the affected city or affected county may do either of the following:
(I) Require that the replacement units be made available at affordable rent or affordable housing cost to, and occupied by, low-income persons or families. If the replacement units will be rental dwelling units, these units shall be subject to a recorded affordability restriction for at least 55 years. (II) Require that the units be replaced in compliance with the jurisdiction’s rent or price control ordinance, provided that each unit is replaced. Unless otherwise required by the affected city or affected county’s rent or price control ordinance, these units shall not be subject to a recorded affordability restriction.
(B) The housing development project will include at least as many residential dwelling units as the greatest number of residential dwelling units that existed on the project site within the last five years. (C) Any existing residents will be allowed to occupy their units until six months before the start of construction activities with proper notice, subject to Chapter 16 (commencing with Section 7260) of Division 7 of Title 1. (D) The developer agrees to provide both of the following to the occupants of any protected units:
(i) Relocation benefits to the occupants of those affordable residential rental units, subject to Chapter 16 (commencing with Section 7260) of Division 7 of Title 1.
(ii) A right of first refusal for a comparable unit available in the new housing development affordable to the household at an affordable rent, as defined in Section 50053 of the Health and Safety Code, or an affordable housing cost, as defined in 50052.5.
88 Ch. 654 — 32 —
(E) For purposes of this paragraph:
(i) “Equivalent size” means that the replacement units contain at least the same total number of bedrooms as the units being replaced. (ii) “Protected units” means any of the following:
(I) Residential dwelling units that are or were subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of lower or very low income within the past five years. (II) Residential dwelling units that are or were subject to any form of rent or price control through a public entity’s valid exercise of its police power within the past five years.
(III) Residential dwelling units that are or were occupied by lower or very low income households within the past five years.
(IV) Residential dwelling units that were withdrawn from rent or lease in accordance with Chapter 12.75 (commencing with Section 7060) of Division 7 of Title 1 within the past 10 years.
(iii) “Replace” shall have the same meaning as provided in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65915. (3) This subdivision shall not supersede any objective provision of a locally adopted ordinance that places restrictions on the demolition of residential dwelling units or the subdivision of residential rental units that are more protective of lower income households, requires the provision of a greater number of units affordable to lower income households, or that requires greater relocation assistance to displaced households. (4) This subdivision shall only apply to a housing development project that submits a complete application pursuant to Section 65943 on or after January 1, 2020.
(e) The Department of Housing and Community Development shall determine those cities and counties in this state that are affected cities and affected counties, in accordance with subdivision (a) by June 30, 2020. The department may update the list of affected cities and affected counties once on or after January 1, 2021, to account for changes in urbanized areas or urban clusters due to new data obtained from the 2020 census. The department’s determination shall remain valid until January 1, 2025. (f) (1) Except as provided in paragraphs (3) and (4) and subdivisions (h) and (i), this section shall prevail over any conflicting provision of this title or other law regulating housing development in this state to the extent that this section more fully advances the intent specified in paragraph (2). (2) It is the intent of the Legislature that this section be broadly construed so as to maximize the development of housing within this state. Any exception to the requirements of this section, including an exception for the health and safety of occupants of a housing development project, shall be construed narrowly.
(3) This section shall not be construed as prohibiting the adoption or amendment of a development policy, standard, or condition in a manner that:
(A) Allows greater density.
(B) Facilitates the development of housing.
88 — 33 — Ch. 654