4.1.b
Packet Pg. 517 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 46
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-371-014 436-371-014-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-015 436-371-015-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-016 436-371-016-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-017 436-371-017-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-018 436-371-018-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-019 436-371-019-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-020 436-371-020-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-021 436-371-021-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-022 436-371-022-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-023 436-371-023-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-024 436-371-024-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-025 436-371-025-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-026 436-371-026-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-027 436-371-027-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-028 436-371-028-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-029 436-371-029-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-030 436-371-030-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-371-031 436-371-031-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-001 436-372-001-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-002 436-372-002-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-003 436-372-003-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-004 436-372-004-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-005 436-372-005-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-006 436-372-006-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-007 436-372-007-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-008 436-372-008-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-009 436-372-009-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-010 436-372-010-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-011 436-372-011-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-012 436-372-012-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-013 436-372-013-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-372-014 436-372-014-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-001 436-380-001-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-002 436-380-002-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-003 436-380-003-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-004 436-380-004-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-005 436-380-005-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-006 436-380-006-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-007 436-380-007-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-008 436-380-008-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 Copyright © 2013 by NBS Page 2 of 4 05/14/2022 11:25:28AM
4.1.b
Packet Pg. 518 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 46
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-380-009 436-380-009-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-010 436-380-010-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-380-011 436-380-011-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-001 436-381-001-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-002 436-381-002-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-003 436-381-003-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-004 436-381-004-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-005 436-381-005-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-006 436-381-006-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-007 436-381-007-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-008 436-381-008-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-009 436-381-009-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-010 436-381-010-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-011 436-381-011-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-012 436-381-012-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-013 436-381-013-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-381-014 436-381-014-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-001 436-382-001-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-002 436-382-002-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-003 436-382-003-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-004 436-382-004-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-005 436-382-005-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-006 436-382-006-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-007 436-382-007-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-008 436-382-008-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-009 436-382-009-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-010 436-382-010-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-011 436-382-011-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-382-012 436-382-012-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-001 436-383-001-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-002 436-383-002-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-003 436-383-003-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-004 436-383-004-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-005 436-383-005-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-006 436-383-006-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-007 436-383-007-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-008 436-383-008-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-009 436-383-009-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-010 436-383-010-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-011 436-383-011-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 Copyright © 2013 by NBS Page 3 of 4 05/14/2022 11:25:28AM
4.1.b
Packet Pg. 519 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 46
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-383-012 436-383-012-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-013 436-383-013-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-014 436-383-014-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-015 436-383-015-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-016 436-383-016-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-017 436-383-017-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-018 436-383-018-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-019 436-383-019-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-020 436-383-020-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-021 436-383-021-8 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-022 436-383-022-9 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-023 436-383-023-0 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-024 436-383-024-1 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-025 436-383-025-2 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-026 436-383-026-3 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-027 436-383-027-4 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-028 436-383-028-5 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-029 436-383-029-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-030 436-383-030-6 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 436-383-031 436-383-031-7 40.06 162.80 215.59 437.38 81.30 (0.01) 937.12 140 Accounts $5,608.40 $22,792.00 $30,182.60 $61,233.20 $11,382.00 ($1.40) $131,196.80 Copyright © 2013 by NBS Page 4 of 4 05/14/2022 11:25:28AM
4.1.b
Packet Pg. 520 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 48
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 434-200-013 434-200-013-1 $441.28 $631.64 $0.00 $0.00 $343.14 $0.00 $1,416.06 1 Accounts $441.28 $631.64 $0.00 $0.00 $343.14 $0.00 $1,416.06 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:25:33AM
4.1.b
Packet Pg. 521 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 49
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 433-130-021 433-130-021-5 $26.33 $49.15 $0.00 $207.55 $39.49 $0.00 $322.52 433-130-025 433-130-025-9 26.33 49.15 0.00 207.55 39.49 0.00 322.52 433-510-001 433-510-001-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-002 433-510-002-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-003 433-510-003-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-004 433-510-004-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-005 433-510-005-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-006 433-510-006-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-007 433-510-007-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-008 433-510-008-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-009 433-510-009-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-010 433-510-010-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-011 433-510-011-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-012 433-510-012-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-013 433-510-013-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-014 433-510-014-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-015 433-510-015-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-016 433-510-016-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-017 433-510-017-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-018 433-510-018-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-019 433-510-019-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-020 433-510-020-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-021 433-510-021-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-022 433-510-022-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-023 433-510-023-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-024 433-510-024-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-510-025 433-510-025-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-001 433-511-001-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-002 433-511-002-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-003 433-511-003-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-004 433-511-004-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-005 433-511-005-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-006 433-511-006-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-511-007 433-511-007-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-001 433-512-001-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-002 433-512-002-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-003 433-512-003-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-004 433-512-004-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-005 433-512-005-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-006 433-512-006-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 Copyright © 2013 by NBS Page 1 of 3 05/22/2022 01:18:02PM
4.1.b
Packet Pg. 522 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 49
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 433-512-007 433-512-007-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-008 433-512-008-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-009 433-512-009-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-010 433-512-010-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-011 433-512-011-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-012 433-512-012-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-013 433-512-013-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-014 433-512-014-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-015 433-512-015-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-016 433-512-016-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-017 433-512-017-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-018 433-512-018-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-019 433-512-019-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-020 433-512-020-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-021 433-512-021-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-022 433-512-022-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-023 433-512-023-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-024 433-512-024-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-025 433-512-025-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-512-026 433-512-026-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-001 433-520-001-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-002 433-520-002-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-003 433-520-003-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-004 433-520-004-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-005 433-520-005-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-520-006 433-520-006-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-001 433-521-001-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-002 433-521-002-6 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-003 433-521-003-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-004 433-521-004-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-005 433-521-005-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-006 433-521-006-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-007 433-521-007-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-008 433-521-008-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-009 433-521-009-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-521-010 433-521-010-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-522-001 433-522-001-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-522-002 433-522-002-9 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-522-003 433-522-003-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-522-004 433-522-004-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 Copyright © 2013 by NBS Page 2 of 3 05/22/2022 01:18:02PM
4.1.b
Packet Pg. 523 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 49
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 433-522-005 433-522-005-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-523-001 433-523-001-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-523-002 433-523-002-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-524-001 433-524-001-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-524-002 433-524-002-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-525-001 433-525-001-7 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-525-002 433-525-002-8 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-001 433-526-001-0 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-002 433-526-002-1 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-003 433-526-003-2 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-004 433-526-004-3 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-005 433-526-005-4 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 433-526-006 433-526-006-5 52.66 98.31 173.78 415.11 78.99 (0.01) 818.84 93 Accounts $4,844.72 $9,044.51 $15,813.98 $38,190.11 $7,267.07 ($0.91) $75,159.48 Copyright © 2013 by NBS Page 3 of 3 05/22/2022 01:18:02PM
4.1.b
Packet Pg. 524 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 51
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-710-001 436-710-001-0 $612.21 $580.41 $0.00 $504.17 $470.93 $0.00 $2,167.72 436-710-002 436-710-002-1 776.69 736.34 0.00 639.62 597.45 0.00 2,750.10 436-710-003 436-710-003-2 1,599.07 1,516.00 0.00 1,316.87 1,230.04 0.00 5,661.98 436-710-004 436-710-004-3 2,448.87 2,321.65 0.00 2,016.69 1,883.73 0.00 8,670.94 436-710-005 436-710-005-4 1,964.58 1,862.51 0.00 1,617.87 1,511.20 0.00 6,956.16 436-710-006 436-710-006-5 1,206.16 1,143.50 0.00 993.29 927.80 (0.01) 4,270.74 436-710-007 436-710-007-6 621.35 589.07 0.00 511.69 477.96 (0.01) 2,200.06 436-710-008 436-710-008-7 740.14 701.69 0.00 609.52 569.33 0.00 2,620.68 436-710-009 436-710-009-8 1,443.74 1,368.73 0.00 1,188.94 1,110.55 0.00 5,111.96 436-710-010 436-710-010-8 731.00 693.03 0.00 601.99 562.30 0.00 2,588.32 10 Accounts $12,143.81 $11,512.93 $0.00 $10,000.65 $9,341.29 ($0.02) $42,998.66 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:25:44AM
4.1.b
Packet Pg. 525 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 52
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 437-083-001 437-083-001-0 $62.36 $9.93 $56.12 $62.36 $80.88 ($0.01) $271.64 437-083-002 437-083-002-1 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-003 437-083-003-2 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-004 437-083-004-3 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-005 437-083-005-4 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-006 437-083-006-5 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-007 437-083-007-6 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-008 437-083-008-7 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 437-083-009 437-083-009-8 62.36 9.93 56.12 62.36 80.88 (0.01) 271.64 9 Accounts $561.24 $89.37 $505.08 $561.24 $727.92 ($0.09) $2,444.76 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:25:47AM
4.1.b
Packet Pg. 526 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 53
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-090-001 432-090-001-7 $24.18 $381.73 $328.86 $258.91 $78.33 ($0.01) $1,072.00 432-090-002 432-090-002-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-090-003 432-090-003-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-090-004 432-090-004-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-090-005 432-090-005-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-001 432-091-001-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-002 432-091-002-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-003 432-091-003-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-004 432-091-004-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-005 432-091-005-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-006 432-091-006-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-007 432-091-007-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-008 432-091-008-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-009 432-091-009-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-010 432-091-010-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-011 432-091-011-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-012 432-091-012-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-013 432-091-013-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-014 432-091-014-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-015 432-091-015-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-016 432-091-016-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-017 432-091-017-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-018 432-091-018-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-019 432-091-019-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-091-020 432-091-020-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-001 432-092-001-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-002 432-092-002-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-003 432-092-003-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-004 432-092-004-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-005 432-092-005-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-006 432-092-006-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-007 432-092-007-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-008 432-092-008-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-009 432-092-009-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-010 432-092-010-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-011 432-092-011-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-012 432-092-012-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-013 432-092-013-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-014 432-092-014-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-015 432-092-015-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 Copyright © 2013 by NBS Page 1 of 3 05/14/2022 11:25:52AM
4.1.b
Packet Pg. 527 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 53
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-092-016 432-092-016-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-017 432-092-017-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-018 432-092-018-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-019 432-092-019-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-020 432-092-020-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-021 432-092-021-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-022 432-092-022-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-023 432-092-023-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-024 432-092-024-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-025 432-092-025-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-026 432-092-026-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-027 432-092-027-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-092-028 432-092-028-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-001 432-093-001-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-002 432-093-002-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-003 432-093-003-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-004 432-093-004-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-005 432-093-005-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-006 432-093-006-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-007 432-093-007-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-008 432-093-008-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-009 432-093-009-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-093-010 432-093-010-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-100-001 432-100-001-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-100-002 432-100-002-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-100-003 432-100-003-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-100-004 432-100-004-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-001 432-101-001-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-002 432-101-002-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-003 432-101-003-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-004 432-101-004-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-005 432-101-005-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-006 432-101-006-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-007 432-101-007-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-008 432-101-008-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-009 432-101-009-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-010 432-101-010-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-011 432-101-011-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-012 432-101-012-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-013 432-101-013-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 Copyright © 2013 by NBS Page 2 of 3 05/14/2022 11:25:52AM
4.1.b
Packet Pg. 528 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 53
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-101-014 432-101-014-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-015 432-101-015-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-016 432-101-016-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-017 432-101-017-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-018 432-101-018-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-101-019 432-101-019-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-001 432-102-001-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-002 432-102-002-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-003 432-102-003-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-004 432-102-004-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-005 432-102-005-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-006 432-102-006-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-007 432-102-007-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-008 432-102-008-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-009 432-102-009-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-010 432-102-010-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-011 432-102-011-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-012 432-102-012-3 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-013 432-102-013-4 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-014 432-102-014-5 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-015 432-102-015-6 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-016 432-102-016-7 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-017 432-102-017-8 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-018 432-102-018-9 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-019 432-102-019-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-020 432-102-020-0 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-021 432-102-021-1 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 432-102-022 432-102-022-2 24.18 381.73 328.86 258.91 78.33 (0.01) 1,072.00 108 Accounts $2,611.44 $41,226.84 $35,516.88 $27,962.28 $8,459.64 ($1.08) $115,776.00 Copyright © 2013 by NBS Page 3 of 3 05/14/2022 11:25:52AM
4.1.b
Packet Pg. 529 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 54
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 439-120-041 439-120-041-4 $668.13 $0.00 $989.85 $1,113.55 $599.44 ($0.01) $3,370.96 1 Accounts $668.13 $0.00 $989.85 $1,113.55 $599.44 ($0.01) $3,370.96 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:25:57AM
4.1.b
Packet Pg. 530 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 55
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-060-001 432-060-001-4 $23.96 $381.44 $328.62 $258.71 $80.88 ($0.01) $1,073.60 432-060-002 432-060-002-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-003 432-060-003-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-004 432-060-004-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-005 432-060-005-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-006 432-060-006-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-007 432-060-007-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-008 432-060-008-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-009 432-060-009-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-010 432-060-010-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-011 432-060-011-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-012 432-060-012-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-013 432-060-013-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-014 432-060-014-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-015 432-060-015-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-016 432-060-016-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-017 432-060-017-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-018 432-060-018-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-019 432-060-019-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-020 432-060-020-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-060-021 432-060-021-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-001 432-070-001-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-002 432-070-002-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-003 432-070-003-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-004 432-070-004-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-005 432-070-005-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-006 432-070-006-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-007 432-070-007-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-008 432-070-008-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-009 432-070-009-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-010 432-070-010-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-011 432-070-011-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-012 432-070-012-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-070-013 432-070-013-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-001 432-071-001-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-002 432-071-002-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-003 432-071-003-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-004 432-071-004-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-005 432-071-005-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-006 432-071-006-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 Copyright © 2013 by NBS Page 1 of 4 05/14/2022 11:26:02AM
4.1.b
Packet Pg. 531 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 55
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-071-007 432-071-007-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-008 432-071-008-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-009 432-071-009-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-010 432-071-010-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-011 432-071-011-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-012 432-071-012-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-013 432-071-013-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-014 432-071-014-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-015 432-071-015-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-016 432-071-016-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-017 432-071-017-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-018 432-071-018-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-019 432-071-019-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-020 432-071-020-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-021 432-071-021-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-022 432-071-022-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-023 432-071-023-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-071-024 432-071-024-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-072-001 432-072-001-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-072-002 432-072-002-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-001 432-080-001-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-002 432-080-002-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-003 432-080-003-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-004 432-080-004-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-005 432-080-005-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-006 432-080-006-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-007 432-080-007-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-008 432-080-008-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-009 432-080-009-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-010 432-080-010-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-011 432-080-011-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-012 432-080-012-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-080-013 432-080-013-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-001 432-081-001-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-002 432-081-002-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-003 432-081-003-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-004 432-081-004-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-005 432-081-005-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-006 432-081-006-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-007 432-081-007-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 Copyright © 2013 by NBS Page 2 of 4 05/14/2022 11:26:02AM
4.1.b
Packet Pg. 532 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 55
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-081-008 432-081-008-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-009 432-081-009-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-010 432-081-010-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-011 432-081-011-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-012 432-081-012-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-013 432-081-013-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-014 432-081-014-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-015 432-081-015-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-016 432-081-016-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-017 432-081-017-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-018 432-081-018-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-019 432-081-019-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-020 432-081-020-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-021 432-081-021-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-022 432-081-022-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-023 432-081-023-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-024 432-081-024-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-025 432-081-025-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-081-026 432-081-026-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-001 432-082-001-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-002 432-082-002-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-003 432-082-003-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-004 432-082-004-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-005 432-082-005-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-006 432-082-006-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-007 432-082-007-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-008 432-082-008-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-009 432-082-009-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-010 432-082-010-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-011 432-082-011-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-082-012 432-082-012-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-001 432-083-001-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-002 432-083-002-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-003 432-083-003-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-004 432-083-004-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-005 432-083-005-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-006 432-083-006-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-007 432-083-007-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-008 432-083-008-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-009 432-083-009-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 Copyright © 2013 by NBS Page 3 of 4 05/14/2022 11:26:02AM
4.1.b
Packet Pg. 533 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 55
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-083-010 432-083-010-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-011 432-083-011-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-083-012 432-083-012-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-001 432-084-001-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-002 432-084-002-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-003 432-084-003-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-004 432-084-004-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-005 432-084-005-2 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-006 432-084-006-3 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-007 432-084-007-4 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-008 432-084-008-5 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-009 432-084-009-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-010 432-084-010-6 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-011 432-084-011-7 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-012 432-084-012-8 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-013 432-084-013-9 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-014 432-084-014-0 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 432-084-015 432-084-015-1 23.96 381.44 328.62 258.71 80.88 (0.01) 1,073.60 138 Accounts $3,306.48 $52,638.72 $45,349.56 $35,701.98 $11,161.44 ($1.38) $148,156.80 Copyright © 2013 by NBS Page 4 of 4 05/14/2022 11:26:02AM
4.1.b
Packet Pg. 534 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 59
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 433-291-043 433-291-043-3 $690.25 $1,649.87 $0.00 $887.46 $568.66 $0.00 $3,796.24 433-291-044 433-291-044-4 721.16 1,723.75 0.00 927.20 594.12 (0.01) 3,966.22 433-291-047 433-291-047-7 2,383.27 5,696.59 0.00 3,064.18 1,963.45 (0.01) 13,107.48 433-291-048 433-291-048-8 1,861.29 4,448.92 0.00 2,393.07 1,533.41 (0.01) 10,236.68 433-291-049 433-291-049-9 1,445.76 3,455.71 0.00 1,858.82 1,191.08 (0.01) 7,951.36 433-300-034 433-300-034-2 2,451.96 5,860.75 0.00 3,152.49 2,020.03 (0.01) 13,485.22 6 Accounts $9,553.69 $22,835.59 $0.00 $12,283.22 $7,870.75 ($0.05) $52,543.20 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:11AM
4.1.b
Packet Pg. 535 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 61
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-520-001 436-520-001-3 $45.22 $28.60 $83.67 $237.45 $91.70 $0.00 $486.64 436-520-002 436-520-002-4 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-003 436-520-003-5 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-004 436-520-004-6 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-005 436-520-005-7 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-006 436-520-006-8 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-007 436-520-007-9 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-008 436-520-008-0 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-009 436-520-009-1 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-010 436-520-010-1 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-011 436-520-011-2 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-012 436-520-012-3 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-013 436-520-013-4 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-014 436-520-014-5 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-015 436-520-015-6 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-016 436-520-016-7 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-017 436-520-017-8 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-018 436-520-018-9 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-019 436-520-019-0 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-020 436-520-020-0 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-021 436-520-021-1 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-022 436-520-022-2 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-023 436-520-023-3 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-024 436-520-024-4 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-025 436-520-025-5 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-026 436-520-026-6 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-027 436-520-027-7 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-028 436-520-028-8 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-029 436-520-029-9 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-030 436-520-030-9 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-031 436-520-031-0 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-032 436-520-032-1 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-033 436-520-033-2 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-034 436-520-034-3 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-035 436-520-035-4 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-036 436-520-036-5 45.22 28.60 83.67 237.45 91.70 0.00 486.64 436-520-037 436-520-037-6 45.22 28.60 83.67 237.45 91.70 0.00 486.64 37 Accounts $1,673.14 $1,058.20 $3,095.79 $8,785.65 $3,392.90 $0.00 $18,005.68 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:17AM
4.1.b
Packet Pg. 536 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 62
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-480-001 436-480-001-0 $50.06 $227.35 $95.11 $617.51 $102.81 $0.00 $1,092.84 436-480-002 436-480-002-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-480-003 436-480-003-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-480-004 436-480-004-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-480-005 436-480-005-4 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-001 436-481-001-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-002 436-481-002-4 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-003 436-481-003-5 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-004 436-481-004-6 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-005 436-481-005-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-006 436-481-006-8 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-007 436-481-007-9 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-008 436-481-008-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-009 436-481-009-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-010 436-481-010-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-011 436-481-011-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-012 436-481-012-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-013 436-481-013-4 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-014 436-481-014-5 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-015 436-481-015-6 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-016 436-481-016-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-017 436-481-017-8 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-018 436-481-018-9 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-019 436-481-019-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-020 436-481-020-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-021 436-481-021-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-022 436-481-022-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-481-023 436-481-023-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-001 436-482-001-6 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-002 436-482-002-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-003 436-482-003-8 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-004 436-482-004-9 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-005 436-482-005-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-006 436-482-006-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-007 436-482-007-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-482-008 436-482-008-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-001 436-483-001-9 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-002 436-483-002-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-003 436-483-003-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-004 436-483-004-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 Copyright © 2013 by NBS Page 1 of 2 05/14/2022 11:26:23AM
4.1.b
Packet Pg. 537 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 62
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-483-005 436-483-005-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-006 436-483-006-4 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-007 436-483-007-5 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-008 436-483-008-6 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-009 436-483-009-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-010 436-483-010-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-011 436-483-011-8 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-012 436-483-012-9 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-013 436-483-013-0 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-483-014 436-483-014-1 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-001 436-484-001-2 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-002 436-484-002-3 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-003 436-484-003-4 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-004 436-484-004-5 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-005 436-484-005-6 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-006 436-484-006-7 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 436-484-007 436-484-007-8 50.06 227.35 95.11 617.51 102.81 0.00 1,092.84 57 Accounts $2,853.42 $12,958.95 $5,421.27 $35,198.07 $5,860.17 $0.00 $62,291.88 Copyright © 2013 by NBS Page 2 of 2 05/14/2022 11:26:23AM
4.1.b
Packet Pg. 538 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 63
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-290-001 432-290-001-5 $31.02 $609.20 $42.10 $232.70 $45.22 $0.00 $960.24 432-290-002 432-290-002-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-003 432-290-003-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-004 432-290-004-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-005 432-290-005-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-006 432-290-006-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-007 432-290-007-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-290-008 432-290-008-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-001 432-291-001-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-002 432-291-002-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-003 432-291-003-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-004 432-291-004-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-005 432-291-005-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-006 432-291-006-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-007 432-291-007-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-008 432-291-008-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-009 432-291-009-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-010 432-291-010-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-011 432-291-011-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-012 432-291-012-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-013 432-291-013-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-014 432-291-014-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-015 432-291-015-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-291-016 432-291-016-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-001 432-292-001-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-002 432-292-002-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-003 432-292-003-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-004 432-292-004-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-005 432-292-005-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-006 432-292-006-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-007 432-292-007-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-008 432-292-008-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-009 432-292-009-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-010 432-292-010-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-011 432-292-011-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-012 432-292-012-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-013 432-292-013-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-014 432-292-014-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-015 432-292-015-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-292-016 432-292-016-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 Copyright © 2013 by NBS Page 1 of 3 05/14/2022 11:26:29AM
4.1.b
Packet Pg. 539 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 63
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-293-001 432-293-001-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-002 432-293-002-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-003 432-293-003-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-004 432-293-004-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-005 432-293-005-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-006 432-293-006-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-007 432-293-007-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-008 432-293-008-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-009 432-293-009-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-010 432-293-010-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-011 432-293-011-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-012 432-293-012-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-013 432-293-013-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-293-014 432-293-014-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-294-001 432-294-001-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-294-002 432-294-002-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-294-003 432-294-003-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-294-004 432-294-004-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-001 432-295-001-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-002 432-295-002-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-003 432-295-003-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-004 432-295-004-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-005 432-295-005-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-006 432-295-006-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-007 432-295-007-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-008 432-295-008-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-295-009 432-295-009-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-001 432-300-001-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-002 432-300-002-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-003 432-300-003-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-004 432-300-004-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-005 432-300-005-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-006 432-300-006-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-007 432-300-007-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-008 432-300-008-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-009 432-300-009-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-010 432-300-010-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-011 432-300-011-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-012 432-300-012-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-013 432-300-013-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 Copyright © 2013 by NBS Page 2 of 3 05/14/2022 11:26:29AM
4.1.b
Packet Pg. 540 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 63
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-300-014 432-300-014-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-300-015 432-300-015-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-001 432-301-001-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-002 432-301-002-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-003 432-301-003-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-004 432-301-004-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-005 432-301-005-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-006 432-301-006-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-007 432-301-007-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-008 432-301-008-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-009 432-301-009-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-010 432-301-010-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-301-011 432-301-011-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-001 432-302-001-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-002 432-302-002-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-003 432-302-003-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-004 432-302-004-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-005 432-302-005-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-006 432-302-006-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-007 432-302-007-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-008 432-302-008-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-009 432-302-009-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-010 432-302-010-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-011 432-302-011-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-012 432-302-012-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-013 432-302-013-2 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-014 432-302-014-3 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-015 432-302-015-4 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-016 432-302-016-5 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-017 432-302-017-6 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-018 432-302-018-7 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-019 432-302-019-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-020 432-302-020-8 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-021 432-302-021-9 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-022 432-302-022-0 31.02 609.20 42.10 232.70 45.22 0.00 960.24 432-302-023 432-302-023-1 31.02 609.20 42.10 232.70 45.22 0.00 960.24 116 Accounts $3,598.32 $70,667.20 $4,883.60 $26,993.20 $5,245.52 $0.00 $111,387.84 Copyright © 2013 by NBS Page 3 of 3 05/14/2022 11:26:29AM
4.1.b
Packet Pg. 541 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 64
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-531-001 436-531-001-7 $266.16 $129.26 $166.35 $0.00 $409.42 ($0.01) $971.18 436-531-002 436-531-002-8 266.16 129.26 166.35 0.00 409.42 (0.01) 971.18 436-531-003 436-531-003-9 266.16 129.26 166.35 0.00 409.42 (0.01) 971.18 436-531-004 436-531-004-0 266.16 129.26 166.35 0.00 409.42 (0.01) 971.18 436-531-005 436-531-005-1 266.16 129.26 166.35 0.00 409.42 (0.01) 971.18 5 Accounts $1,330.80 $646.30 $831.75 $0.00 $2,047.10 ($0.05) $4,855.90 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:33AM
4.1.b
Packet Pg. 542 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 65
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-680-001 436-680-001-8 $79.83 $326.42 $147.71 $638.76 $117.86 $0.00 $1,310.58 436-680-002 436-680-002-9 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-003 436-680-003-0 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-004 436-680-004-1 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-005 436-680-005-2 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-006 436-680-006-3 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-007 436-680-007-4 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-008 436-680-008-5 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-009 436-680-009-6 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-010 436-680-010-6 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-011 436-680-011-7 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-012 436-680-012-8 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-013 436-680-013-9 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-014 436-680-014-0 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-015 436-680-015-1 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-016 436-680-016-2 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-017 436-680-017-3 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-018 436-680-018-4 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-019 436-680-019-5 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-680-020 436-680-020-5 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-001 436-681-001-1 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-002 436-681-002-2 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-003 436-681-003-3 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-004 436-681-004-4 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-005 436-681-005-5 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-006 436-681-006-6 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-007 436-681-007-7 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-008 436-681-008-8 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 436-681-009 436-681-009-9 79.83 326.42 147.71 638.76 117.86 0.00 1,310.58 29 Accounts $2,315.07 $9,466.18 $4,283.59 $18,524.04 $3,417.94 $0.00 $38,006.82 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:37AM
4.1.b
Packet Pg. 543 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 66
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 434-040-042 434-040-042-3 $33.26 $0.00 $60.99 $166.34 $56.52 ($0.01) $317.10 434-040-043 434-040-043-4 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-044 434-040-044-5 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-045 434-040-045-6 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-046 434-040-046-7 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-047 434-040-047-8 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-048 434-040-048-9 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-049 434-040-049-0 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-050 434-040-050-0 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-051 434-040-051-1 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-052 434-040-052-2 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-053 434-040-053-3 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-054 434-040-054-4 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-055 434-040-055-5 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-056 434-040-056-6 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-057 434-040-057-7 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-058 434-040-058-8 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-059 434-040-059-9 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-060 434-040-060-9 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-061 434-040-061-0 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-062 434-040-062-1 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 434-040-063 434-040-063-2 33.26 0.00 60.99 166.34 56.52 (0.01) 317.10 22 Accounts $731.72 $0.00 $1,341.78 $3,659.48 $1,243.44 ($0.22) $6,976.20 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:42AM
4.1.b
Packet Pg. 544 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 67
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 438-600-001 438-600-001-4 $89.81 $262.42 $130.98 $479.02 $139.95 $0.00 $1,102.18 438-600-002 438-600-002-5 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-003 438-600-003-6 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-004 438-600-004-7 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-005 438-600-005-8 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-006 438-600-006-9 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-007 438-600-007-0 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-008 438-600-008-1 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-009 438-600-009-2 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-010 438-600-010-2 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-011 438-600-011-3 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-012 438-600-012-4 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-013 438-600-013-5 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-014 438-600-014-6 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-015 438-600-015-7 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-016 438-600-016-8 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-017 438-600-017-9 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-018 438-600-018-0 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-019 438-600-019-1 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-020 438-600-020-1 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-021 438-600-021-2 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-022 438-600-022-3 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-023 438-600-023-4 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-024 438-600-024-5 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-025 438-600-025-6 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-026 438-600-026-7 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-027 438-600-027-8 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-028 438-600-028-9 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-029 438-600-029-0 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-030 438-600-030-0 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-031 438-600-031-1 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-032 438-600-032-2 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-033 438-600-033-3 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-034 438-600-034-4 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 438-600-035 438-600-035-5 89.81 262.42 130.98 479.02 139.95 0.00 1,102.18 35 Accounts $3,143.35 $9,184.70 $4,584.30 $16,765.70 $4,898.25 $0.00 $38,576.30 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:46AM
4.1.b
Packet Pg. 545 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 68
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 437-420-001 437-420-001-1 $274.83 $69.69 $183.21 $0.00 $210.39 $0.00 $738.12 437-420-002 437-420-002-2 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-003 437-420-003-3 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-004 437-420-004-4 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-005 437-420-005-5 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-006 437-420-006-6 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-007 437-420-007-7 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-008 437-420-008-8 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-009 437-420-009-9 274.83 69.69 183.21 0.00 210.39 0.00 738.12 437-420-010 437-420-010-9 274.83 69.69 183.21 0.00 210.39 0.00 738.12 10 Accounts $2,748.30 $696.90 $1,832.10 $0.00 $2,103.90 $0.00 $7,381.20 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:26:50AM
4.1.b
Packet Pg. 546 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 73
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 439-070-022 439-070-022-3 $2,874.19 $439.52 $5,543.09 $0.00 $784.46 $0.00 $9,641.26 1 Accounts $2,874.19 $439.52 $5,543.09 $0.00 $784.46 $0.00 $9,641.26 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:16AM
4.1.b
Packet Pg. 547 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 75
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 435-261-006 435-261-006-1 $219.12 $0.00 $0.00 $0.00 $123.31 ($0.01) $342.42 435-261-010 435-261-010-4 294.37 0.00 0.00 0.00 165.66 (0.01) 460.02 2 Accounts $513.49 $0.00 $0.00 $0.00 $288.97 ($0.02) $802.44 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:21AM
4.1.b
Packet Pg. 548 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-720-001 436-720-001-1 $40.51 $286.42 $553.08 $332.30 $45.55 $0.00 $1,257.86 436-720-002 436-720-002-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-003 436-720-003-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-004 436-720-004-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-005 436-720-005-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-006 436-720-006-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-007 436-720-007-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-008 436-720-008-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-009 436-720-009-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-010 436-720-010-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-011 436-720-011-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-012 436-720-012-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-013 436-720-013-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-014 436-720-014-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-015 436-720-015-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-016 436-720-016-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-017 436-720-017-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-018 436-720-018-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-019 436-720-019-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-720-020 436-720-020-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-001 436-721-001-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-002 436-721-002-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-003 436-721-003-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-004 436-721-004-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-005 436-721-005-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-006 436-721-006-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-007 436-721-007-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-008 436-721-008-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-009 436-721-009-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-010 436-721-010-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-011 436-721-011-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-012 436-721-012-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-013 436-721-013-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-014 436-721-014-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-015 436-721-015-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-016 436-721-016-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-017 436-721-017-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-018 436-721-018-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-019 436-721-019-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-020 436-721-020-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 1 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 549 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-721-021 436-721-021-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-022 436-721-022-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-023 436-721-023-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-024 436-721-024-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-025 436-721-025-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-026 436-721-026-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-027 436-721-027-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-028 436-721-028-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-029 436-721-029-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-030 436-721-030-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-031 436-721-031-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-032 436-721-032-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-721-033 436-721-033-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-722-001 436-722-001-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-722-002 436-722-002-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-722-003 436-722-003-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-001 436-730-001-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-002 436-730-002-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-003 436-730-003-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-004 436-730-004-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-005 436-730-005-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-006 436-730-006-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-007 436-730-007-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-008 436-730-008-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-009 436-730-009-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-010 436-730-010-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-011 436-730-011-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-012 436-730-012-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-013 436-730-013-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-014 436-730-014-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-015 436-730-015-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-016 436-730-016-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-017 436-730-017-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-018 436-730-018-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-019 436-730-019-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-020 436-730-020-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-021 436-730-021-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-022 436-730-022-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-023 436-730-023-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-024 436-730-024-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 2 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 550 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-730-025 436-730-025-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-026 436-730-026-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-027 436-730-027-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-028 436-730-028-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-730-029 436-730-029-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-001 436-731-001-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-002 436-731-002-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-003 436-731-003-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-004 436-731-004-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-005 436-731-005-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-006 436-731-006-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-007 436-731-007-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-731-008 436-731-008-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-001 436-732-001-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-002 436-732-002-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-003 436-732-003-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-004 436-732-004-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-005 436-732-005-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-006 436-732-006-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-007 436-732-007-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-008 436-732-008-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-009 436-732-009-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-010 436-732-010-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-011 436-732-011-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-012 436-732-012-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-013 436-732-013-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-014 436-732-014-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-015 436-732-015-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-016 436-732-016-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-017 436-732-017-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-732-018 436-732-018-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-001 436-733-001-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-002 436-733-002-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-003 436-733-003-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-004 436-733-004-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-005 436-733-005-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-006 436-733-006-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-007 436-733-007-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-008 436-733-008-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-009 436-733-009-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 3 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 551 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-733-010 436-733-010-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-011 436-733-011-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-012 436-733-012-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-013 436-733-013-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-014 436-733-014-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-733-015 436-733-015-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-001 436-740-001-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-002 436-740-002-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-003 436-740-003-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-004 436-740-004-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-005 436-740-005-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-006 436-740-006-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-007 436-740-007-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-008 436-740-008-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-009 436-740-009-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-010 436-740-010-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-011 436-740-011-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-012 436-740-012-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-013 436-740-013-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-014 436-740-014-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-740-015 436-740-015-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-001 436-741-001-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-002 436-741-002-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-003 436-741-003-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-004 436-741-004-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-005 436-741-005-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-006 436-741-006-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-007 436-741-007-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-008 436-741-008-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-009 436-741-009-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-010 436-741-010-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-011 436-741-011-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-012 436-741-012-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-013 436-741-013-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-014 436-741-014-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-015 436-741-015-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-016 436-741-016-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-017 436-741-017-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-741-018 436-741-018-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-001 436-742-001-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 4 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 552 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-742-002 436-742-002-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-003 436-742-003-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-004 436-742-004-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-005 436-742-005-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-006 436-742-006-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-007 436-742-007-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-008 436-742-008-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-009 436-742-009-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-010 436-742-010-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-011 436-742-011-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-012 436-742-012-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-013 436-742-013-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-014 436-742-014-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-015 436-742-015-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-016 436-742-016-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-017 436-742-017-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-018 436-742-018-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-742-019 436-742-019-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-001 436-750-001-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-002 436-750-002-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-003 436-750-003-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-004 436-750-004-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-005 436-750-005-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-006 436-750-006-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-007 436-750-007-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-008 436-750-008-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-009 436-750-009-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-010 436-750-010-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-011 436-750-011-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-012 436-750-012-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-013 436-750-013-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-014 436-750-014-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-015 436-750-015-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-016 436-750-016-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-017 436-750-017-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-018 436-750-018-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-019 436-750-019-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-020 436-750-020-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-021 436-750-021-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-022 436-750-022-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 5 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 553 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-750-023 436-750-023-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-024 436-750-024-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-025 436-750-025-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-026 436-750-026-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-027 436-750-027-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-750-028 436-750-028-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-001 436-751-001-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-002 436-751-002-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-003 436-751-003-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-004 436-751-004-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-005 436-751-005-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-006 436-751-006-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-007 436-751-007-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-008 436-751-008-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-009 436-751-009-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-010 436-751-010-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-011 436-751-011-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-012 436-751-012-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-013 436-751-013-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-014 436-751-014-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-015 436-751-015-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-016 436-751-016-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-017 436-751-017-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-018 436-751-018-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-019 436-751-019-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-020 436-751-020-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-021 436-751-021-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-022 436-751-022-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-023 436-751-023-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-024 436-751-024-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-025 436-751-025-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-026 436-751-026-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-027 436-751-027-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-028 436-751-028-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-029 436-751-029-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-030 436-751-030-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-031 436-751-031-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-032 436-751-032-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-033 436-751-033-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-034 436-751-034-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 6 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 554 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-751-035 436-751-035-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-036 436-751-036-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-037 436-751-037-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-038 436-751-038-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-039 436-751-039-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-040 436-751-040-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-041 436-751-041-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-042 436-751-042-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-043 436-751-043-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-044 436-751-044-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-751-045 436-751-045-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-001 436-760-001-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-002 436-760-002-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-003 436-760-003-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-004 436-760-004-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-005 436-760-005-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-006 436-760-006-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-007 436-760-007-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-008 436-760-008-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-009 436-760-009-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-010 436-760-010-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-760-011 436-760-011-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-001 436-761-001-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-002 436-761-002-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-003 436-761-003-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-004 436-761-004-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-005 436-761-005-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-006 436-761-006-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-007 436-761-007-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-008 436-761-008-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-009 436-761-009-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-010 436-761-010-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-011 436-761-011-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-012 436-761-012-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-013 436-761-013-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-014 436-761-014-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-015 436-761-015-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-016 436-761-016-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-017 436-761-017-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-018 436-761-018-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 7 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 555 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-761-019 436-761-019-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-020 436-761-020-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-021 436-761-021-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-022 436-761-022-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-023 436-761-023-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-024 436-761-024-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-025 436-761-025-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-026 436-761-026-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-027 436-761-027-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-761-028 436-761-028-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-001 436-762-001-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-002 436-762-002-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-003 436-762-003-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-004 436-762-004-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-005 436-762-005-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-006 436-762-006-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-007 436-762-007-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-008 436-762-008-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-009 436-762-009-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-010 436-762-010-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-011 436-762-011-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-012 436-762-012-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-013 436-762-013-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-014 436-762-014-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-015 436-762-015-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-016 436-762-016-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-017 436-762-017-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-018 436-762-018-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-019 436-762-019-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-020 436-762-020-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-021 436-762-021-9 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-022 436-762-022-0 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-023 436-762-023-1 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-024 436-762-024-2 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-025 436-762-025-3 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-026 436-762-026-4 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-027 436-762-027-5 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-028 436-762-028-6 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-029 436-762-029-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 436-762-030 436-762-030-7 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 Copyright © 2013 by NBS Page 8 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 556 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 76
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 436-762-031 436-762-031-8 40.51 286.42 553.08 332.30 45.55 0.00 1,257.86 321 Accounts $13,003.71 $91,940.82 $177,538.68 $106,668.30 $14,621.55 $0.00 $403,773.06 Copyright © 2013 by NBS Page 9 of 9 05/14/2022 11:27:29AM
4.1.b
Packet Pg. 557 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 85
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 437-044-028 437-044-028-4 $559.44 $169.09 $0.00 $745.92 $249.52 ($0.01) $1,723.96 1 Accounts $559.44 $169.09 $0.00 $745.92 $249.52 ($0.01) $1,723.96 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:38AM
4.1.b
Packet Pg. 558 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 86
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Storm Drain Street Light Other Total 432-270-021 432-270-021-1 $1,155.72 $4,413.05 $0.00 $1,733.58 $1,658.60 ($0.01) $8,960.94 432-270-022 432-270-022-2 895.42 3,419.12 0.00 1,343.14 1,285.04 0.00 6,942.72 432-270-023 432-270-023-3 1,468.08 5,605.77 0.00 2,202.12 2,106.87 0.00 11,382.84 3 Accounts $3,519.22 $13,437.94 $0.00 $5,278.84 $5,050.51 ($0.01) $27,286.50 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:42AM
4.1.b
Packet Pg. 559 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 88
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Sidewalk Maint Storm Drain Street Light Other Total 437-220-012 437-220-012-3 $3,964.84 $1,847.54 $0.00 $979.12 $2,152.34 $1,107.62 $0.00 $10,051.46 1 Accounts $3,964.84 $1,847.54 $0.00 $979.12 $2,152.34 $1,107.62 $0.00 $10,051.46 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:46AM
4.1.b
Packet Pg. 560 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 90
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Sidewalk Maint Storm Drain Street Light Other Total 432-280-029 432-280-029-0 $215.52 $634.30 $0.00 $110.49 $242.46 $70.72 ($0.01) $1,273.48 1 Accounts $215.52 $634.30 $0.00 $110.49 $242.46 $70.72 ($0.01) $1,273.48 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:52AM
4.1.b
Packet Pg. 561 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) City of San Jacinto
Landscaping, Lighting & Park Dist. 2 Zone 91
Final Billing Detail Report for Fiscal Year 2022/23
Account ID Property ID DB Graffiti Removal Landscape Maint Park Maint Sidewalk Maint Storm Drain Street Light Other Total 437-180-028 437-180-028-5 $274.38 $905.70 $0.00 $93.77 $69.96 $161.70 ($0.01) $1,505.50 1 Accounts $274.38 $905.70 $0.00 $93.77 $69.96 $161.70 ($0.01) $1,505.50 Copyright © 2013 by NBS Page 1 of 1 05/14/2022 11:27:55AM
4.1.b
Packet Pg. 562 Attachment: LLPD2 FY 22-23 Engineer's Report (LLPD2 FY 22/23 Annual Levy - Resolution 3939) LLPD 2
City of San Jacinto, County of Riverside
List of Property Tax Fund Numbers
Fund Name Fund Name Fund Name
682813 LLPD 2 Zone 1, 1A 682847 LLPD 2 Zone 35 689341 LLPD 2 Zone 61 682814 LLPD 2 Zone 2 682848 LLPD 2 Zone 36 689342 LLPD 2 Zone 62 682815 LLPD 2 Zone 3 682849 LLPD 2 Zone 37 689343 LLPD 2 Zone 63 682816 LLPD 2 Zone 4 682850 LLPD 2 Zone 38 689344 LLPD 2 Zone 64 682817 LLPD 2 Zone 5 682851 LLPD 2 Zone 39 689345 LLPD 2 Zone 65 682818 LLPD 2 Zone 6 682852 LLPD 2 Zone 40 689346 LLPD 2 Zone 66 682819 LLPD 2 Zone 7 682855 LLPD 2 Zone 82 689347 LLPD 2 Zone 67 682820 LLPD 2 Zone 8 682856 LLPD 2 Zone 84 689348 LLPD 2 Zone 68 682821 LLPD 2 Zone 9 682857 LLPD 2 Zone 83 689349 LLPD 2 Zone 69 682822 LLPD 2 Zone 10 682858 LLPD 2 Zone 85 689350 LLPD 2 Zone 70 682823 LLPD 2 Zone 14 682859 LLPD 2 Zone 86 689351 LLPD 2 Zone 71 682824 LLPD 2 Zone 16 682860 LLPD 2 Zone 87 689352 LLPD 2 Zone 72 682825 LLPD 2 Zone 17 689320 LLPD 2 Zone 11 689353 LLPD 2 Zone 73 682826 LLPD 2 Zone 18 689321 LLPD 2 Zone 41 689354 LLPD 2 Zone 74 682828 LLPD 2 Zone 12 689322 LLPD 2 Zone 42 689355 LLPD 2 Zone 75 682829 LLPD 2 Zone 13 689323 LLPD 2 Zone 43 689356 LLPD 2 Zone 76 682830 LLPD 2 Zone 15 689324 LLPD 2 Zone 44 689357 LLPD 2 Zone 77 682831 LLPD 2 Zone 19-1 689325 LLPD 2 Zone 45 689358 LLPD 2 Zone 78 682832 LLPD 2 Zone 20 689326 LLPD 2 Zone 46 689359 LLPD 2 Zone 79 682833 LLPD 2 Zone 21 689327 LLPD 2 Zone 47 689360 LLPD 2 Zone 80 682834 LLPD 2 Zone 22 689328 LLPD 2 Zone 48 689361 LLPD 2 Zone 19-2 682835 LLPD 2 Zone 23 689329 LLPD 2 Zone 49 689371 LLPD 2 Zone 88 682836 LLPD 2 Zone 24 689330 LLPD 2 Zone 50 689372 LLPD 2 Zone 89 682837 LLPD 2 Zone 25 689331 LLPD 2 Zone 51 689373 LLPD 2 Zone 90 682838 LLPD 2 Zone 26 689332 LLPD 2 Zone 52 689374 LLPD 2 Zone 91 682839 LLPD 2 Zone 27 689333 LLPD 2 Zone 53
682840 LLPD 2 Zone 28 689334 LLPD 2 Zone 54
682841 LLPD 2 Zone 29 689335 LLPD 2 Zone 55
682842 LLPD 2 Zone 30 689336 LLPD 2 Zone 56
682843 LLPD 2 Zone 31 689337 LLPD 2 Zone 57
682844 LLPD 2 Zone 32 689338 LLPD 2 Zone 58
682845 LLPD 2 Zone 33 689339 LLPD 2 Zone 59
682846 LLPD 2 Zone 34 689340 LLPD 2 Zone 60
4.1.c
Packet Pg. 563 Attachment: LLPD 2 List of Fund Numbers (LLPD2 FY 22/23 Annual Levy - Resolution 3939) July 19, 2022
TO: City Council
REQUESTED BY: Erika Gomez, Finance Director
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: LLPD1 FY 22/23 Annual Levy - Resolution 3940
RECOMMENDATION:
Staff recommends that the City Council:
1) Conclude the public hearing that was continued from its regular meeting on July 5, 2022; and
2) Adopt Resolution 3940 confirming a diagram and assessment and levying the assessment for the District for FY 22-23.
DISCUSSION:
On June 21, 2022, the City Council adopted a Resolution declaring its intention to levy and collect assessments within the District for FY 22-23, accepting the Engineer’s Report (the “report”), and giving notice and setting the time and place of the public hearing of the proposed assessment.
On July 5, 2022, the City Council opened the public hearing for the Resolution of Intent and, by motion, continued the public hearing to July 19, 2022.
The Resolution of Intent declaring the public hearing for Tuesday, July 5, 2022, at 6:30 p.m was published on June 27, 2022. In order to provide the 10-day notice required by Section 22553 of the Streets and Highways Code, a subsequent notice of public hearing was published on July 7, 2022 to reflect the continuation of the public hearing to July 19, 2022.
The report proposes to charge assessable properties within the District the maximum allowable assessment. However, the maximum allowable assessment is insufficient to cover the full cost of the current service level provided to the District; therefore, the FY 22-23 budget contains a subsidy from the General Fund to cover costs.
The assessments will be placed on the property owners’ tax bills for FY 22-23, payable with the ad valorem tax bill in two installments due on November 1, 2022 (delinquent December 10, 2022) and February 1, 2023 (delinquent April 10, 2023).
The adoption of this Resolution is required annually to continue the levy assessment of the District and to authorize its collection with the annual general levy secured property tax roll.
4.2 Packet Pg. 564
FISCAL IMPACT:
The levy is anticipated to generate approximately $659,957, which is insufficient to fund the budgeted expenditures of the District. Staff has estimated a budget subsidy of approximately $1,115,454 from the General Fund to make up the District shortfall.
Failure to approve the attached resolution would preclude the District entirely from collecting the assessments needed to pay the District’s expenses, and the General Fund would have to replace the entire revenue of LLPD No. 1.
ATTACHMENTS:
Resolution No. 3940
LLPD1 FY 22-23 Engineer's Report
4.2 Packet Pg. 565
Resolution No. 3940
STATE OF CALIFORNIA ) RESOLUTION NO. 3940
COUNTY OF RIVERSIDE )ss
CITY OF SAN JACINTO )
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JACINTO CONFIRMING DIAGRAM AND ASSESSMENT FOR
LANDSCAPING, LIGHTING, AND PARK DISTRICT NO. 1 (LLPD NO. 1) FOR FISCAL YEAR 2022-2023 (FY 22-23)
WHEREAS, the City Council of the City of San Jacinto has initiated proceedings for the levy and collection of assessments for FY 22-23 for LLPD No. 1 pursuant to the Landscaping and Lighting Act of 1972, Part 2 (commencing with Section 22500) of Division 15 of the Streets and Highways Code (the “Act”), which, among other things, scheduled a public hearing on the levy and collection of assessments on the lots and parcels of assessable property within LLPD No. 1 of the City of San Jacinto, and WHEREAS, notice of said hearing was given pursuant to Section 22626 and duly published as required by Sections 22552 and 22553 of said Code; and WHEREAS, the City Council has ordered the filing of an Engineer’s Report (the “report”) with the City Clerk, pursuant to law for the City Council’s consideration and subsequently thereto the City Council adopted its Resolution of Intention approving the report, and declaring the intention of the City Council to order the levy and collection of assessments to pay the costs and expenses of maintaining the landscaped areas, street lights and public parks in LLPD No. 1 for the Fiscal Year commencing July 1, 2022 and ending June 30, 2023; and
WHEREAS, in November, 1996 the voters of the State of California passed Proposition 218 which added Articles XIIIC and XIIID to the California Constitution requiring, among other things, new procedures for the approval of the levying of assessments against real property; and
WHEREAS, Article XIIID, Section 4 of the California Constitution requires that assessments comply with state procedural and approval provisions by July 1, 1997, unless and Assessment District meets certain exemptions as set forth in Section 5 of Article XIIID, which exemptions include the following:
“(a) any assessment imposed exclusively to finance capital costs or maintenance and operation expenses for sidewalks, streets, sewers, water, flood control, drainage system or vector control.” “(b) any assessment imposed pursuant to a petition signed by the persons owning all of the parcels subject to the assessment at the time the assessment is initially imposed”; and
4.2.a
Packet Pg. 566 Attachment: Resolution No. 3940 (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Resolution No. 3940
WHEREAS, assessments proposed for FY 22-23 are exempt from Proposition 218 because the assessments either generate revenue for the operation and maintenance of streets and highways, all expenditures thereunder qualifying as street maintenance as defined by the State of California, or the assessments were approved by the property owners on June 16, 1992, originally imposed prior to the passage of Proposition 218; and WHEREAS, the public hearing adopting this Resolution was initially noticed for July 5, 2022 and, by motion, has been continued to July 19, 2022; and WHEREAS, the adoption of this Resolution, among other things, is required to levy the proposed assessment for FY 22-23;
NOW, THEREFORE, BE IT RESOLVED, determined and ordered by the City Council of the City of San Jacinto, as follows:
SECTION 1: Following notice duly given by publication, the City Council has held a public hearing regarding the levy of the proposed assessment within LLPD No. 1 for the Fiscal Year commencing July 1, 2022 and ending June 30, 2023 to pay for the costs and expenses of maintaining and servicing the public landscaped improvements, street lights and parks installed and constructed within LLPD No. 1.
All interested persons were afforded the opportunity to hear and be heard regarding protests and objections have been considered by the City Council.
SECTION 2: The City Council hereby confirms the diagram and assessment set forth in the report for FY 22-23 and orders the maintenance and servicing of the public landscaped improvements, street lights and parks installed and constructed in LLPD No. 1 and as more particularly described in the report.
SECTION 3: The adoption of this Resolution constitutes the levy of an assessment for the Fiscal Year commencing July 1, 2022 and ending June 30, 2023. Said assessment is levied without regard to property valuation.
SECTION 4: The maintenance and servicing of the public landscaped areas, street lights and parks shall be performed pursuant to law and the County Auditor of Riverside County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessment shall then be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
4.2.a
Packet Pg. 567 Attachment: Resolution No. 3940 (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Resolution No. 3940
SECTION 5: The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund known as LLPD No. 1 Fund.
SECTION 6: The City Clerk is hereby authorized and directed to file the assessment with the County Auditor, together with a certified copy of this Resolution upon its adoption.
SECTION 7: A certified copy of the assessment diagram shall be filed in the office of the City Clerk and open for public inspection.
APPROVED AND ADOPTED this 19th day of July 2022 by the following vote:
AYES:
NAYS:
ABSENT:
ABSTAIN:
CITY OF SAN JACINTO:
By: __________________________________
Crystal Ruiz, Mayor
ATTEST:
___________________________________
Julia Espinoza, City Clerk
APPROVED AS TO FORM:
Michael J. Maurer, City Attorney
Best Best & Krieger, LLP
4.2.a
Packet Pg. 568 Attachment: Resolution No. 3940 (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Resolution No. 3940
CERTIFICATION
STATE OF CALIFORNIA)
COUNTY OF RIVERSIDE)
CITY OF SAN JACINTO)
I, Julia Espinoza, City Clerk of the City of San Jacinto, DO HEREBY CERTIFY that the foregoing Resolution No. 3940 was passed, approved, and adopted at the Regular Meeting of the San Jacinto City Council held on July 19, 2022.
AYES:
NAYS:
ABSENT:
ABSTAIN:
WITNESS MY HAND AND OFFICIAL SEAL this 19th day of July 2022. ______________________________
Julia Espinoza, City Clerk
City of San Jacinto
4.2.a
Packet Pg. 569 Attachment: Resolution No. 3940 (LLPD1 FY 22/23 Annual Levy - Resolution 3940) nbsgov.com
Prepared by:
Corporate Headquarters
32605 Temecula Parkway, Suite 100
Temecula, CA 92592
Toll free: 800.676.7516
Fiscal Year 2022/23 Engineer’s Report For:
Landscaping, Lighting and Park District No. 1
July 2022
4.2.b
Packet Pg. 570 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940)
TABLE OF CONTENTS
1. ENGINEER’S LETTER ........................................................................................................1
2. OVERVIEW......................................................................................................................2
3. PLANS AND SPECIFICATIONS FOR THE IMPROVEMENTS ..................................................4
3.1 Landscaping and Park Maintenance .........................................................................4
3.2 Street Lights and Traffic Signals ................................................................................4
3.3 Street Trees...............................................................................................................5
4. ESTIMATE OF COSTS .......................................................................................................6
5. METHOD OF APPORTIONMENT.......................................................................................7
5.1 Method of Apportionment........................................................................................7
5.2 Zones of Benefit ........................................................................................................8
5.3 Assessment Formula .................................................................................................9
6. ASSESSMENT UNIT (“AU”) METHOD.............................................................................. 11
7. BOUNDARIES AND ASSESSMENT DIAGRAM................................................................... 15
8. PETITION FOR PARK ASSESSMENTS ............................................................................... 16
9. ASSESSMENT ROLL........................................................................................................ 18
4.2.b
Packet Pg. 571 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940)
4.2.b
Packet Pg. 572 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 2
2. OVERVIEW
This District, by special benefit assessments, provides funding for the installation, operation, maintenance and servicing of: street lights and traffic signals, landscaped areas (parkways and medians, etc.) and municipal parks; on a citywide basis; all of which are located on public land, public rights-of-way, or in landscaping easements within the City.
In November of 1996, the voters of California passed Proposition 218 which added Articles XIII C and XIII D to the California Constitution. These Constitutional provisions affect the procedural and substantive requirements for the levy of assessments. Among other things, the requirements provide that assessed parcels of real property must receive a special benefit from assessments. Assessments are also subject to new majority protest requirements. These new requirements apply, unless an assessment district meets certain exemptions set forth in Proposition 218.
The following assessments are exempt from the procedures and approval process of Article XIII D of the California Constitution:
A. Any assessment imposed exclusively to finance the capital costs or maintenance and/or operation expenses for sidewalks, streets, sewers, water, flood control, drainage systems, or vector control; or B. Any assessment imposed pursuant to a petition signed by the persons owning all of the parcels subject to the assessment at the time the assessment is initially imposed.
Zone A (Including Sub-Zones A-1, A-2 and A-3), Zone B and Zone E of the District qualify as existing assessments exempt under exemption "A" described above. This conclusion has been reached using the definitions provided by the Office of the Controller for the State of California and the Guidelines Relating to Gas Tax Expenditures published by the division of local government affairs. Under this definition, street improvements include, but are not limited to, such things as street lighting and parkway and median landscaping.
Zone D park maintenance assessments within the District also qualify as an existing assessment exempt under exemption "B" described above in that the park maintenance assessment imposed was consented to by all of the persons owning all of the parcels subject to the park maintenance assessment at the time the assessment was initially imposed. The language of Articles XIII C and XIII D will be subject to future legislation and court decisions in order to clarify the specific intent of these Constitutional provisions. At the time that this report was prepared no such legislation or judicial guidance existed with regard to determining how the property owner consent exemption would apply. However, the drafter of these provisions, the Howard Jarvis Taxpayers Association, has stated that it intended to exempt from the procedural and substantive requirements those assessments being re-levied on an annual basis under an existing assessment district so long as the assessments are not increased. The proposed assessments for the 2022/23 Fiscal Year for the District fall within this exemption because they are merely the annual levy for assessments previously consented to by property owners, and are not being increased.
Section 22573, of the Landscaping and Lighting Act of 1972 (the “1972 Act”), requires assessments to be levied according to benefit rather than according to assessed value. The section states:
4.2.b
Packet Pg. 573 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 3
"The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated special benefits to be received by each such lot or parcel from the improvements.
The determination of whether or not a lot or parcel will benefit from the improvements shall be made pursuant to the Improvement Act of 1911 (Division 7 commencing with Section 5000) [of the Streets and Highways Code, State of California]."
The 1972 Act also provides for the classification of various areas within an assessment district into different zones where, “by reason of variations in the nature, location and extent of the improvements, the various areas will receive differing degrees of benefit from the improvements. A zone shall consist of all territory which will receive substantially the same degree of benefit from the improvements." An assessment district may consist of contiguous or noncontiguous areas.
Although Proposition 218 mandates that parcels owned by public agencies be assessed if they receive special benefit from the improvements being serviced and maintained by the assessments; under the exemptions stated above, properties owned by public agencies, such as city, county, state, federal government, or board-governed special districts, are not assessed.
The word “parcel,” for the purposes of this report, refers to an individual property assigned its own assessor’s parcel number by the Riverside County Assessor’s Office. The Riverside County Auditor/Controller uses assessor’s parcel numbers and specific fund numbers to identify, on the tax roll, properties assessed for special district benefit assessments.
Following consideration of public comments at a noticed public hearing, and review of the Final Annual Engineer’s Report, the City Council may confirm the report as submitted and order the levy and collection of assessments for Fiscal Year 2022/23. If approved, the assessment information will be submitted to the Riverside County Auditor/Controller and included on the property tax roll for each benefiting parcel for Fiscal Year 2022/23.
4.2.b
Packet Pg. 574 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 4
3. PLANS AND SPECIFICATIONS FOR THE IMPROVEMENTS
Plans and specifications for the improvements have been prepared and approved as part of the improvement plans. These plans and specifications are on file and available for review at the office of the City Engineer and, by reference, have been made part of this report.
3.1 Landscaping and Park Maintenance
A map showing the location of all landscaping sub-zones and park maintenance areas within the District is on file at City Hall with the City Clerk and is made a part of this report by reference.
Servicing means the furnishing of:
1. Water for the irrigation of any landscape, park improvement, the operation of any fountains, or the maintenance of any other appurtenant improvements.
2. Electric current or energy, gas, or other illuminating agent for any public lighting facilities or for the lighting or operation of any other improvement.
Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of any improvement, including:
1. Installation, repair, removal or replacement of all or any part of any landscape, park improvement, including turf, shrub and tree plantings, statuary, fountains, other ornamental structures, lights, electrical systems, playground equipment, play courts, paving, curbs, gutters, sidewalks, and public restrooms.
2. Removal of graffiti by washing, painting, grinding, sanding, or other usual means.
3. Providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury.
4. The removal of trimmings, rubbish, debris, and other solid waste.
5. Land preparation which may be necessary for the installation, repair or replacement of landscape, park improvements, irrigation systems, sidewalks and drainage, including grading, leveling, cutting, filling, and sod.
3.2 Street Lights and Traffic Signals
A map showing the location of all street lights within the District is on file at City Hall with the City Clerk and is made a part of this report by reference.
Servicing means the furnishing of electric current or energy, gas or other illuminating agent for public street lighting and traffic signal facilities.
Maintenance means the furnishing of services and materials for the ordinary and usual installation, maintenance, operation, and servicing of any improvement, including the repair, removal, or replacement of all or any part of a component of the street lighting system, traffic signal system, or appurtenant horizontal or vertical surfaces (including graffiti removal).
4.2.b
Packet Pg. 575 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 5
3.3 Street Trees
Reference to Street Trees throughout this report is only a description of improvements that were proposed during initial formation of the District. The assessment for street trees, although approved by property owners during the initial formation of the District, was not levied by the City prior to the passage of Proposition 218. As such, since the District has been grandfathered in under the assessment methodology and assessment rates existing prior to Proposition 218, the assessment for street trees cannot be levied unless additional property owner approval is secured through the procedures outlined in Proposition 218.
4.2.b
Packet Pg. 576 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 6
4. ESTIMATE OF COSTS
The following table provides an estimate of the costs of the improvements for Fiscal Year 2022/23.
4.2.b
Packet Pg. 577 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Parks Cost Item
A-1 A-2 A-3 B C D Totals
City-wide Soboba Springs Rancho San Jacinto Lights No Lights $425,929 $8,641 $136,262 $0 0 $194,771 $765,603
Maintenance & Operations
Supplies & Materials 2 0 0 500 0 0 0 500
Professional & Specialized Services 3 22,564 3,114 5,564 2,564 0 2,563 36,369 Repair & Maintenance 4 0 0 0 0
Contracts, Leases & Rents 5 170,000 53,850 448,200 50,664 0 160,000 882,714 Utilities 6 36,000 25,600 126,000 90,000 0 45,000 322,600 Overhead, Insurance & Bonds 23,250 8,573 57,758 29,209 0 27,130 145,920 Capital Outlays 0 0 0 0 0 0 0
0 0 (112,286) 0 0 (64,025) (176,311)
Interfund Transfer (Equipment Replacement) 0 0 0 0 0 0 0 CSA 152 (71,950) (130,000) 0 0 0 (201,950) (350,636) (61,260) (454,960) 66,553 (315,151) (1,115,454) TOTALS $255,157 $38,518 $77,038 $238,990 $0 $50,288 $659,991 Amount per AU $35 $230 $77 $26 $0 $15Rounding and Adjustments ($1) $0 $0 $0 $0 ($0) (33.30)TOTAL AMOUNT TO ASSESSMENT $659,957.28 Notes: 2. Supplies and Materials include office supplies, uniforms and safety equipment, small tools, etc. 3. Professional and Specialized Services include assessment engineering, legal counsel, City administration and County Auditor fees.
4. Repair and Maintenance includes building and vehicle R&M, parts and supplies for landscaping, irrigation and mowing, and street light R&M.
5. Contracts, Leases and Rents include weekend restroom maintenance, landscape maintenance contracts, traffic signal maintenance provided by Riverside County/CALTRANS, and vertical surface maintenance (graffiti abatement). 6. Utilities include water, electricity, and street light maintenance provided by SCE and City of San Jacinto.
8. Subject to available funds.
Landscaping Lighting
CITY OF SAN JACINTO
LANDSCAPING, LIGHTING AND PARK DISTRICT No. 1
MAINTENANCE ESTIMATE
FISCAL YEAR 2022/23
BENEFIT ZONES
7. Fund Transfer from Rancho San Jacinto LLPD No. 2 funds to finance the LLPD No. 2 component of shared facilities in Rancho San Jacinto, and to account for the LLPD No. 2 zones that don't have parks and contribute to the City-wide parks.
Cost Items
Personnel Services 1 Interfund Transfer (LLPD No. 2) 7 Interfund Transfer (General Fund) 8
1. Personnel Services is calculated based on estimated hours and a fully-burdened hourly rate, which includes amounts for salaries, fringe benefits, and other departmental operating expenditures that cannot be directly assigned to one zone. Accordingly, all other expenditures are those directly charged to each zone.
4.2.b
Packet Pg. 578
Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 7
5. METHOD OF APPORTIONMENT
5.1 Method of Apportionment
The net amount to be assessed upon lands within the District in accordance with this report is apportioned by a formula and method which fairly distributes the amount among all assessable lots or parcels in proportion to the estimated special benefit to be received by each lot or parcel from the improvements, namely the maintenance and servicing of public landscaping, lighting and park facilities within such District.
The maintenance and servicing of public landscaping, lighting and park facilities installed and constructed in public places in the City provides a special benefit which is received by parcels within the specified zones of benefit in the District. Landscaping within the District enhances the aesthetic appeal of parcels within the landscaping zones. Such landscaping improves erosion resistance and dust control. Street lights improve ingress and egress from lots or parcels by illuminating access after sunset. Such street lights, by so improving ingress and egress, improve the security of such lots or parcels by improving the nighttime visibility of such lots or parcels and improve the access of emergency vehicles thereto and in the case of commercial lots or parcels, facilitate the opening and operation of business uses after sunset.
The primary benefits of landscaping are set forth below:
1. Improved aesthetic appeal of nearby parcels.
2. Green space within the urban environment.
3. Enhances wind breaks.
4. Improved erosion resistance.
5. Improved dust control.
6. Tends to instill a sense of pride within the neighborhood.
The primary benefits of municipal parks are as set forth below:
1. Designated sites where children may gather to play without danger from traffic.
2. Designated sites where adult, youth and family activities can take place (i.e., picnics, baseball and softball leagues, soccer leagues, other athletic activities, art festivals, animal shows, and training, etc.)
3. Green space and open space within the urban environment.
4. Availability of public restrooms.
The primary benefits of street lighting are set forth below:
1. Improvement to traffic circulation and reduction in nighttime accidents and attendant human misery and decrease in personal property loss.
2. The deterrence of crime and aid to police protection.
3. Promotion of business during nighttime hours.
4. Increased nighttime safety on roads and highways.
4.2.b
Packet Pg. 579 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 8
5. The improved ability of pedestrians and motorists to see, which helps people safely find their way.
6. Improved ingress and egress to lots and parcels.
7. Reduction in vandalism and other criminal acts, and reduced damage to improvements.
5.2 Zones of Benefit
The 1972 Act provides for areas within a district to be classified into different zones of benefit. The District is divided into separate zones and sub-zones for funding landscaping, lighting and park improvements. The various zones and sub-zones are delineated on the Assessment Diagram on file in the office of the City Clerk.
5.2.1 LANDSCAPING ZONES
Landscaping is divided into three (3) benefit sub-zones. These sub-zones are labeled A-1, A-2 and A-3 and are comprised of the areas described below:
Landscape Zone Descriptions:
1. Subzone A-1: All parcels in the fully inhabited areas of the City approximately bounded by the San Jacinto River, the southerly City Limit, the northerly prolongation of Pine Avenue, De Anza Drive, the San Diego Aqueduct, and the northerly City Limit to the San Jacinto River; with the exception of Subzones A-2 and A-3; and excluding parcels in Landscaping, Lighting and Park District No. 2.
2. Subzone A-2: All parcels in the Soboba Springs (Village IV) Tract.
3. Subzone A-3: All parcels in the Rancho San Jacinto area that are not in Landscaping, Lighting and Park District No. 2.
5.2.2 STREET LIGHTING ZONES
Street lighting is divided into two (2) benefit zones. These zones are labeled Zone B (lighted areas) and Zone C (non-lit outlying areas) and are comprised of the areas described below:
Street Lighting Zone Descriptions:
1. Zone B: Those parcels within the boundary of the District that have street lights installed within close proximity or that are surrounded by areas that have street lights.
2. Zone C: Those parcels within the boundary of the District that have no street lights within a reasonable distance. These parcels are primarily in outlying areas with little or no population.
5.2.3 PARKS ZONE
Parks are comprised of a single citywide benefit zone designated Zone D and as described below:
Parks Zone Description:
1. Zone D: All parcels within the District that are included in existing residential uses (including apartments, condominiums, PUD's, mobile home parks, recreational vehicle parks, etc.);
4.2.b
Packet Pg. 580 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 9
commercial/industrial uses; and churches/fraternal organizations; and are included in petitions signed when they were developed. No vacant parcels are included.
5.3 Assessment Formula
The formula used to calculate the amount spread to all parcels within the District for landscaping, street lighting, and parks starts with the basic assessment unit (“AU”). The basic AU is given a value of one (1) for a single-family residential parcel. From this base, the remaining parcels are related according to their equivalent benefit within each benefit zone or sub-zone. Zone A parcels are assessed for landscaping separately in three (3) sub-zones. Zone B parcels are assessed for street lighting and Zone C parcels are not assessed for street lighting. Zone D residential and commercial/industrial parcels containing dwelling units or business establishments are assessed for municipal parks.
Vacant parcels (agricultural, residential or commercial/industrial) are assigned 0.5 AU for landscaping and street lighting because they have a partial benefit due to the overall enhancement of the area and to the increase in accessibility from the installation and/or maintenance and servicing of said public improvements. Vacant parcels are not assessed for park maintenance.
Commercial/industrial and public utility parcels are assigned 3.0 AU per acre (1.0 AU minimum, 10.0 AU maximum) for landscaping, street lighting, and parks based upon the fact that one acre of commercial/industrial property is the equivalent of three single-family residences.
Small residences (less than 1,000 square feet and/or less than 50 feet of frontage) (Riverside County Land Use Code "RS") are assessed at a rate of 0.7 AU for landscaping and 1.0 AU for all other improvements due to smaller frontages relative to landscaping, but have the same benefit as other single-family residences from street lights and park maintenance.
Condominiums and PUD's are assigned 0.9 AU for each type of maintenance because, although these units have most of the characteristics of a single-family residence, they generally are somewhat smaller and have common areas and homeowner associations.
Apartments and common unit condominiums are assigned 0.6 AU per apartment unit for landscape maintenance and 0.8 AU for each of the other types of indicated public improvement because apartment units are typically smaller than a single-family residence.
Mobile homes are assigned 0.5 AU per mobile home unit for landscaping and 0.7 AU for street lighting and parks because these units are generally smaller than a single-family residence or condominium.
Recreational vehicle (RV) parks (own or rental) are assigned 0.3 AU for landscape maintenance and 0.7 AU for street lighting and parks for the same reasons cited for mobile homes, except that RV parks often have high vacancies, especially during the summer months.
Railroad parcels are assessed 0.5 AU per acre (1.0 AU minimum, 5.0 AU maximum) for street lighting only because street lighting causes a reduction in vandalism on railroad property and increases safety at railroad crossings, but receives less benefit than does a single-family residence because of the reduced activity on railroad tracks.
4.2.b
Packet Pg. 581 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 10
Churches and fraternal organizations are assigned 0.5 AU per acre (1.0 AU minimum, 4.0 AU maximum) for each type of indicated public improvement because these parcels obtain benefit from each type of improvement, but at a reduced rate due to the periodic use of the property.
Assessments by zone, if applicable, are additive. As the land use on any specific parcel changes from one fiscal year to the next, the applicable assessment rate shall also change to reflect the change in land use.
4.2.b
Packet Pg. 582 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 11
6. ASSESSMENT UNIT (“AU”) METHOD
The following table shows the assessment formula using the AU method for the most common County land use codes.
CITY OF SAN JACINTO
LANDSCAPING, LIGHTING AND PARK DISTRICT NO. 1
ASSESSMENT FORMULA USING ASSESSMENT UNIT (AU) METHOD
Land Use
Code Land Use
Zone A Landscaping
Assessment Formula
Zone B Lighting
Assessment Formula
Zone D Park
Assessment Formula
AA Agricultural Avocado Grove 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AC Agricultural Citrus Grove 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AD Agricultural Dairy 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AI Agricultural Irrigated Farm 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AL Agricultural Livestock 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AN Agricultural Non-Irrigated 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AO Agricultural - Other Crops 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AP Agricultural Poultry 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AR Agricultural Residential 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit AS Agricultural w/Structures 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AV Agricultural Vineyard 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel AY Agricultural Vacant 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel A1 Agricultural Other 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel CA Apartments 0.6 AU per Unit 0.8 AU per Unit 0.8 AU per Unit CF Churches, Fraternal Orgs. 0.5 AU per Acre (1.0 AU min, 4.0 AU max)
0.5 AU per Acre
(1.0 AU min, 4.0 AU max)
0.5 AU per Acre
(1.0 AU min, 4.0 AU max)
4.2.b
Packet Pg. 583 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 12
ASSESSMENT FORMULA USING ASSESSMENT UNIT (AU) METHOD
(Continued)
Land Use
Code Land Use
Zone A Landscaping
Assessment Formula
Zone B Lighting
Assessment Formula
Zone D Park
Assessment Formula
CL Commercial/Industrial
on Leased Land
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
CR Commercial w/Residences 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit CY Commercial Vacant 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel C1
Commercial/Industrial
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
EP Exempt Public Property Exempt Exempt Exempt
HO Homeowner's Assn, Open Space Exempt Exempt Exempt
MF Mobile home Legal Foundation 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel ML Mobile home, Leased Lot 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel MO Mobile home Assessed 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel MP Mobile home Rental/Lease Lot 0.5 AU per MH Unit 0.7 AU per MH Unit 0.7 AU per MH Unit MR Mobile home Lot Only 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel MT Mobile home - Transient 0.3 AU per MH Unit 0.5 AU per MH Unit 0.5 AU per MH Unit M0 Mobile home Assessed 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel M1 Mobile home Assessed 0.5 AU per MH Parcel 0.7 AU per MH Parcel 0.7 AU per MH Parcel PA Ag Preserve Avocado Grove 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel
4.2.b
Packet Pg. 584 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 13
ASSESSMENT FORMULA USING ASSESSMENT UNIT (AU) METHOD
(Continued)
Land Use
Code Land Use
Zone A Landscaping
Assessment Formula
Zone B Lighting
Assessment Formula
Zone D Park
Assessment Formula
PC Ag Preserve Citrus Grove 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PD Ag Preserve Dairy 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PI Ag Preserve Irrigated Farm 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PL Ag Preserve Livestock 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PN Ag Preserve Non-Irrigated 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PO Ag Preserve Other Crops 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PP Ag Preserve Poultry 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PR Ag Preserve Residential 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit PS Ag Preserve w/Structures 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PV Ag Preserve Vineyard 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PY Ag Preserve Vacant 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel P1 Ag Preserve Other 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel PX Ag Preserve 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel R- Residential 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit RA Residential Agriculture 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit RC Residential Condo/PUD 0.9 AU per Condo/PUD Unit 0.9 AU per Condo/PUD Unit 0.9 AU per Condo/PUD Unit R1 Residential Single Family 1.0 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit
4.2.b
Packet Pg. 585 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 14
ASSESSMENT FORMULA USING ASSESSMENT UNIT (AU) METHOD
(Continued)
Land Use
Code Land Use
Zone A Landscaping
Assessment Formula
Zone B Lighting
Assessment Formula
Zone D Park
Assessment Formula
R2 Residential Duplex/Triplex 0.8 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit RS 0.7 AU per Residential Unit 0.7 AU per Residential Unit 1.0 AU per Residential Unit 1.0 AU per Residential Unit RR Railroad Parcels 0.0 AU per Parcel
0.5 AU per Acre
(1.0 AU min, 5.0 AU max) 0.0 AU per Parcel
RV Recreational Vehicle Lot 0.3 AU per RV Parcel 0.5 AU per RV Parcel 0.5 AU per RV Parcel UP Public Utility
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
3.0 AU per Acre
(1.0 AU min, 10.0 AU max)
0.0 AU per Parcel
YD Vacant Desert 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel YM Vacant Mountainous 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel YP Vacant - Prob. Residential 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel YR Vacant Residential 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel YS Vacant Land Miscellaneous 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel YY Vacant Remainder 0.5 AU per Parcel 0.5 AU per Parcel 0.0 AU per Parcel
ASSESSMENT FORMULA USING ASSESSMENT UNIT (AU) METHOD
(Continued)
Notes:
1. Zone C is not assessed.
2. Public Utilities include gas, electricity, telephone, cable TV, etc. Public utility parcels are assessed in the same manner as commercial property because public utilities are “for profit” enterprises.
3. The fraternal organization category includes such organizations as the Elks Lodge, Moose Lodge, IOOF, Order of Eagles, Mason's, Women's Clubs, etc.
4. Public property includes that property that is exempt from assessment including property owned by the City, County, State, Federal Government, water districts and other special districts.
4.2.b
Packet Pg. 586 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 15
7. BOUNDARIES AND ASSESSMENT DIAGRAM
The boundaries of the District are completely within the City limits as shown on the boundary map included in this report. The boundary map and assessor’s maps serve as the assessment diagram for the District. The lines and dimensions shown on the maps of the County Assessor for the current year are incorporated by reference herein and made part of this report. All parcels of real property included within the District are described in detail on the assessor’s maps.
Parcels within Landscaping, Lighting and Park District No. 2, an assessment district formed in April 2002 and subsequent annexations thereto, that are within the boundaries of the District are not levied the District assessments.
4.2.b
Packet Pg. 587 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940)
4.2.b
Packet Pg. 588
Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 16
8. PETITION FOR PARK ASSESSMENTS
The following parcels receive park assessments due to a one hundred percent (100%) petition at the time of development:
COMMON ASSESSOR'S PARCEL NUMBERS
TRACT NO. DESCRIPTION Book Page Parcel(s)
24907 Mt. Valier 547 19 All
20 All
21 All
27335 Richard Beck 431 410 001 thru 015
26729 Adjacent to Montage 433 401 019 thru 023
26020 Montage 433 40 All
25307 Horizons of San Jacinto 431 301 038 thru 076
25099 Castle Court 437 120 048 thru 058
24745 Forecast Development 434 370 009 thru 021
371 010 thru 039
24738 New Beginnings 431 36 All
37 All
24713 Annandale Park 434 43 All
24594 Jack in the Box / Chevron 434 080 030 & 035
24330 Las Brisas / Corsica 433 38 All
39 All
24190 Windsor Place 437 39 All
24140 Hermosa / FN Development 431 31 All
32 All
33 All
34 All
35 All
24054 Peacock Financial 438 46 All
47 All
24048 Peacock Financial 438 41 All
24047-1 Peacock Financial 439 30 All
23793 Barrat American 438 40 All
23791 Summerhill 433 37 All
23790 Evans & Las Rosas 433 36 All
23789 Esplanade & Las Rosas 433 34 All
35 All
23436 S/O Commonwealth 439 31 All
Between Girard & Hewitt 32 All
22950 The Villas 434 40 All
46 All
22882 St. Michel 434 35 All
41 All
42 All
44 All
45 All
22667 Ann Arbor Homes 437 32 All
4.2.b
Packet Pg. 589 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) Landscaping, Lighting, and Park District No. 1 – City of San Jacinto Fiscal Year 2022/23 Engineer’s Report 17
COMMON ASSESSOR'S PARCEL NUMBERS
TRACT NO. DESCRIPTION Book Page Parcel(s)
22665 Seventh & Pine 431 38 All
39 All
40 All
22347 B & L 435 29 All
24052 Treasures 438 44 All
23300 Industrial Condos 435 212 001 thru 036
21900 Soboba Springs 433 32 All
33 All
21564 Park Hill Collection 438 34 All
35 All
36 All
37 All
38 All
42 All
CUP 1-88 Arco - AM/PM 434 070 032
18757 (unrec) Wayment (31 units) 437 251 039
18568 Forecast 433 24 All
25 All
31 All
18314 Heritage RV Park 433 28 All
29 All
30 All
16811 Park Hill Village 551 38 All
4.2.b
Packet Pg. 590 Attachment: LLPD1 FY 22-23 Engineer's Report (LLPD1 FY 22/23 Annual Levy - Resolution 3940) July 19, 2022
TO: City Council
REQUESTED BY: Arthur Mullen, Water Utilities Superintendent APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Award of Contract to Civiltec Engineering, Inc.
RECOMMENDATION:
Staff recommends that the City Council:
1. ACCEPT the proposal by Civiltec Engineering for the design and delivery of plans, specifications, and estimates for the Bath Well Treatment Plant; and
2. AWARD a contract to Civiltec Engineering in the amount of $294,265.00, with an additional 15% contingency for a total project cost of $338,404.75 DISCUSSION:
Over the past several years, the City of San Jacinto has experienced a boom in Economic Development with significant new commercial and residential development causing a strain on the City’s existing, aging, water, wastewater, and stormwater infrastructure requiring significant improvement and investment. In 2020, the City Council authorized a 10-year fiscal model to evaluate its financial stability and long-term solvency. The model showed that the City was operating at a Structural Deficit and at risk of fiscal insolvency in the coming years. To combat the insolvency, the City Council authorized placement of Measure V, a one cent sale tax initiative, on the November 2020 ballot. Measure V funds were specifically intended to address the following community priority areas:
Protecting Local Drinking Water
Maintaining/Improving 911 emergency, medical and public safety response times Increasing public safety to include a new fire engine/crew Increasing the number of deputies on patrol
Maintaining the long term financial stability of the City Supporting local businesses and jobs
Addressing homelessness
Preparing for and recovering from public health emergencies Repairing streets, roads, and potholes
Measure V passed with significant community support with over 68% approval. The number one priority for the Community, was to protect local drinking water, with 89% of respondents stating that this issue was either exceptionally or very important to them.
5.1 Packet Pg. 591
Recently, the Federal Government passed the American Rescue Plan Act of 2021 (ARPA) and Infrastructure Investment and Jobs Act of 2021 which has, and will, provide significant funds over the coming years to the City to address infrastructure needs.
Recently, the City Council approved the ARPA spending priority list, which identified several projects in the City that would qualify for payment through the ARPA Program. One of these projects is designing and constructing a potable water treatment plant at the Bath Well site.
The current treatment plant at the Bath Well site was built in 1992 and is designed to treat Bath and Artesia Well water for iron and manganese. It has since surpassed its operational lifespan of 20 years. The City’s goal is to replace and modernize the facility as well as increase the treatment capacity to 2,500 gallons per minute (gpm) and maintain current minimum treatment levels of 200ug/L for iron and 200ug/L for manganese. The engineering requirements for this project are highly specialized and is outside the scope of the City Engineer’s services. Therefore, the services of an engineering firm specializing in water infrastructure are required to design this project.
On January 11, 2022, the City issued a Request for Qualifications (RFQ) on PlanetBids seeking qualifications from engineering firms. The RFQ closed on February 4, 2022, and on March 1, 2022, the City subsequently approved four engineering firms as “most qualified” in the area of water projects. The firms included Albert A. Webb and Associates, Civiltec Engineering, TKE Engineering, and Willdan Engineering.
On June 7, 2022, the City issued a Request for Proposal (RFP) on PlanetBids, seeking proposals for the plans, specifications, and estimates for the design of a new potable water treatment plant.
The RFP was issued to the four “most qualified” engineering firms listed above. The RFP closed on June 26, 2022, with the City receiving one proposal from Civiltec Engineering.
Staff reviewed Civiltec’s proposal and found that it addressed all project objectives and standards. Civiltec has extensive experience in designing municipal water treatment plants, including recent projects for the City of Norco, City of Santa Fe Springs, Jurupa Community Service District, and the City of Chino.
Civiltec’s proposed project manager possesses over 19 years of water and wastewater experience, while the company’s Principal-in-Charge possesses over 40. Civiltec’s scope of service includes preliminary design reporting, system final design, bidding services, and selection of construction contractor, permitting, and construction support.
It is anticipated that the preliminary and final design phases will be completed in summer 2023.
Upon delivery of the final design, Civiltec will provide bidding support as the City competitively bids the construction portion of the project. Construction is estimated to be approximately $2,000,000.00, which will also be funded by ARPA.
FISCAL IMPACT:
5.1 Packet Pg. 592
The total cost of the scope of work is $294,265.00, with an additional 15% contingency amount of $44,139.75 for a total project cost of $338,404.75. The cost associated with each phase is as follows:
Phase Description Cost
Phase 1 Preliminary Design Report $68,207.00
Phase 2 System Final Design $162,138.00
Phase 3 Bidding Services and Selection of Construction
Contractor
$8,075.00
Phase 4 Permitting $14,875.00
Task 5 Construction Support $40,970.00
Subtotal $294,265.00
15% Contingency $44,139.75
Total $338,404.75
Funding for this project will come from existing ARPA funds, account 199-9999-425-4001, CIP #20-004. There is no impact to the General Fund.
ATTACHMENTS:
Proposal from Civiltec Engineering, Inc.
5.1 Packet Pg. 593
City of San Jacinto
Development of Plans, Specification, and Estimates for Bath Well Site Potable Water Treatment Plant, bidding on 06/26/2022 11:59 PM (PDT)
Printed 06/27/2022
PlanetBids, Inc.
5.1.a
Packet Pg. 594 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.)
5.1.a
Packet Pg. 595 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Civil, Water, Wastewater, Drainage, Transportation and
Electrical/Controls Engineering ● Construction Management ● Surveying California ● Arizona
1440 N. Harbor Blvd., Suite 721, Fullerton, CA 92835 | P: 714.459.7957 | F: 714.459.7464 City of San Jacinto | Public Utilities June 23, 2022
595 South San Jacinto Avenue
San Jacinto, CA 92583
Subject: Proposal for Development of Plans, Specifications, and Estimates (PS&E) for Bath Well Site Potable Water Treatment
Dear Selection Committee:
Originally built in 1992 the plant was designed to treat Bath and Artesia Wells iron and manganese levels. It has since surpassed its operational lifespan and thus is the City of San Jacinto’s (San Jacinto) goal to replace and modernize the facility as well as increase the treatment capacity to 2,500 gallons per minute (gpm) and minimum treatment levels of 200ug/L for iron and 200ug/L for manganese.
Civiltec Engineering, Inc (Civiltec) is excited to present our proposal to provide professional engineering services to San Jacinto in their mission to replace its potable water treatment plant at the Bath Well site. We have a special interest in completing this goal for San Jacinto due to our vast experience with production well treatment projects and our company’s design, construction management and planning efforts performed across Southern California for numerous water agencies and districts. Civiltec provides high-quality engineering with utmost level of integrity.
We are committed to providing you with consistent, forward-thinking engineering, and cost-effective solutions. Our team produces reports and PS&E packages by communicating and troubleshooting early to identify and avoid potential construction problems and/or delays. Civiltec’s decision-making process is based on the consensus of ideas and information to help ensure sound and intelligent recommendations and solutions to give your project the best chance for success. We believe our processes and expertise in delivering solutions specific to your needs will be instrumental. Our experience has shown us to be a valued partner to our clients! We look forward to cultivating a strong relation with you.
Civiltec proposes to assign C. Shem Hawes, PE, as company representative. He is a Principal in the firm and the Fullerton Branch Manager. He will be responsible for the firm’s timely response and quality completion. He has complete authority to handle all contractual matters, commit Civiltec’s resources, as necessary, and take all action necessary to meet your requests. We are confident that we are the right firm for this project and extremely excited to serve your community. I can be reached at [email protected] or (714) 459-7957 with any questions.
Sincerely,
C. Shem Hawes, PE | Principal, Senior Engineer
CSH:tms
W:\Proposals\2022 Proposals\Fullerton\PF22057.00-San Jacinto-Bath Well Potable WTP\Draft Proposal\PF22057 San Jacinto Well Potable Treatment Plant.docx
5.1.a
Packet Pg. 596 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 1
1) DESCRIPTION OF PROJECT APPROACH
Civiltec’s Project Management Approach
Civiltec follows a simple four-part philosophy to promote the timely and effective completion of all projects; (1) we do our homework, (2) we listen, (3) we commit the best technical and personnel resources at our disposal, and (4) we communicate. This philosophy minimizes the need for amendments to
contracts and/or change orders. The process starts with development of the project understanding and continues
with informative communication throughout the project.
Only with a complete understanding of your goals, the
project requirements, potential utility conflicts and
stakeholder/other agency requirements and concerns can
we prepare what we believe will be the most efficient,
economical and practical work plan. We then design an approach with the best available technical expertise and resources to satisfy all the goals and bring the project to a timely and successful completion.
Quality Assurance/Quality Control (QA/QC)
Civiltec’s project manager is responsible for the oversight, management and implementation of the QA/QC process. All documents, including but not limited to, reports, drawings, sketches, specifications, technical provisions, calculations, etc., are subject to internal QA/QC. Design inputs, such as applicable municipal, county, state and federal codes and standards, contract documents and other applicable quality and technical requirements are reviewed for applicability and incorporated, as needed.
The QA/QC manager works with the project manager to review documents for conformance with applicable standards, accuracy and completeness. Reviews are documented with initials and dates for the project manager to review and resolve prior to each submittal.
Budget Control
Civiltec maintains a comprehensive library of previous project construction costs. The library includes internal and external engineer’s opinion of probable construction costs. We also utilize recent contractor bid tabulations and the most current construction cost publication for estimating unit costs for bid schedule items.
We utilize the most up to date technologies to manage the production of our projects simultaneously. Whether working for a governmental agency, corporation or private landowner, we realize that time is money. Project budgets are determined using manhour breakdowns by staff members for each task. Based on man-hour estimates and staff availability, project schedules are established for every task. We utilize Microsoft Project to develop and maintain overall project schedules. These schedules are used in communication with our clients and staff, so all expectations and budgets are met. On schedule projects are on budget projects! We continually stress that point to our clients and team members.
5.1.a
Packet Pg. 597 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 2
Project Understanding
Due to the considerable aging infrastructure of the existing system at the Bath Well site, it is critical for San Jacinto to replace the existing Fe/Mg system. This system has been in place since 1992 and is older than the 20-year useful life spans of similar treatment systems. Considering this, the existing Bath treatment facility has exceeded its useful service life. This poses a risk to supply redundancy and resiliency as the treatment plant may experience upsets that may cause extended shutdowns.
Additional Risks to System Operation:
• Due to the age of the system, replacement parts may be hard to find or may not be supported causing further delays in restarting the system.
Operators need to have a unique system understanding to make the system work using work arounds when proper spare materials are unavailable. • The system uses a substantial amount of unnecessary power by way of excessive head losses during normal production and excessive backwashing sequences. Improvements with a new system will improve power consumption requirements and thus result in lower operational costs over its life.
• The current system has old hydro-pneumatic valves as well. The new system will have electrically operated valves which will result in more resilient operation.
• The Bath Well treatment plant exhibits rusting from the inside causing vessel walls to become thin. San Jacinto has performed numerous repairs on the vessels and has anticipated that failure of the vessels is eminent. • San Jacinto has also experienced difficulties in obtaining service and support from the treatment system vendor’s who are located on the east coast. This condition presents risks to operations and the ability of San Jacinto to deliver a redundant water supply. Newer systems are supported locally and will provide the necessary service and support to ensure that system challenges are alleviated quickly to mitigate against disruptions.
The new system will be sized to treat 2,500 gpm from two wells inclusive of the existing Bath and Artesia Wells. The Bath Well site contains two reservoirs having a total of 1.5 million gallons worth of storage. In addition, the Bath Well site is equipped with an existing wastewater holding tank for treatment plant backwash, a booster pumping station having 3,600 gpm total capacity and the existing iron and manganese treatment facility. The new treatment process will provide San Jacinto with a system that can not only handle the additional flow, but also can be taken down for maintenance on redundant treatment vessels while still allowing for uninterrupted water supply to customers from the Bath Well site.
According to San Jacinto’s 2018 Water Master Plan a total of four wells are operational having a total of 5,250 gpm capacity. The Artesia Well is over 20 years old and Grand Well is nearing 40 years of service. Considering the recent upgrades to the Grand Well, San Jacinto continues to promote upgrades to modernize its infrastructure. Adding capacity at the Bath Well site by increasing the capacity from 1,320 gpm to a total 2,500 gpm with this treatment will further provide redundancy and resiliency to the total supply portfolio.
Aging System
Power Needs
Resiliency
Improved
Condition
Support
5.1.a
Packet Pg. 598 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 3
Currently, San Jacinto experiences maximum day demand (MDD) conditions at approximately 3,000 gpm with demands expected to increase to 3,500 gpm by the year 2040. Good engineering practices will ensure that if the largest supply source is out of service the remaining production wells have sufficient capacity to meet current and future MDD demands. Assuming the Lake Park Well with a capacity of 2,500 gpm is not in service, production from the remaining wells as follows would provide the needed redundancy to meet these conditions:
Existing System Redundant Supply
• Artesia Well – 1,450 gpm (Manganese levels are near the secondary maximum contaminant levels (MCL) and water from Bath Well is utilized to blend.) • Existing Grand Well Capacity – 700 gpm (Dramatic production loss since installation from 1,350 gpm in 2005 to 700 gpm in 2017.)
• Existing New Bath Well Capacity – 600 gpm (Dramatic production loss since installation from 1,500 gpm in 2004 to 600 gpm in 2017.)
• Current Total Redundant Supply – 2,750 gpm
• Current MDD Demand – 3,000 gpm
• Current Deficient Redundant Supply before Treatment and Wells Constructed – 250 gpm Proposed System Redundant Supply
• New Grand Well and Treatment Capacity– 2,000 gpm
• New Bath System Treatment Capacity – 2,500 gpm
• Total Redundant Supply – 4,500 gpm
• Future MDD Demand – 3,500 gpm
• Excess Redundant Supply when Treatment and Wells Constructed – 1,000 gpm As can be seen in the above analysis time is of the essence in terms of delivering a solution to secure potable water supply sources and treatment. The improvements proposed at the New Bath Well site with treatment will further bolster San Jacinto’s supply portfolio and ensure that the current deficiency in supply is alleviated. Additionally, the treated production from the Bath Well can be combined to be treated with the water from the Artesia Well. It is important to also consider that well maintenance and operational constraints are ever changing. This may result in well shutdowns, which consequently has created the need and desire to move forward with the design and construction of the treatment plant at the New Bath Well site.
Water conservation and minimizing waste is a primary concern to San Jacinto. The current treatment system wastes approximately 42,000 gallons per day to backwash at a 900-gpm flow rate. The new production flow rate with two wells online will be approximately 2,400 gpm which is a four-fold increase over the current 600 gpm production rate. Waste using a specialized treatment systems may remain roughly the same as the current system or 41,000 gallons per day while producing four times the water as the current system. Conversely, if San Jacinto were to utilize a green sands system a daily waste of 113,088 gallons may be experienced. Considering this, almost one and a half times the current waste rate of the current system would be realized. This specialized treatment system could potentially save San Jacinto 72,000 gallons per day in wastewater resulting in 80.7 acre-feet of waste minimization per year depending on the treatment solution selected by San Jacinto. Considering
5.1.a
Packet Pg. 599 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 4
these variables, Civiltec will review the potential treatment solutions for consideration in the design development and select the most attractive solution considering capital cost, footprint, product availability, product delivery schedule, system support, and operations and maintenance costs over a 20-year time horizon.
Lastly, the production wells have elevated iron and manganese levels in the groundwater. There is a secondary water quality MCL for iron and manganese. Plus, the heavy metals are hard on equipment and cause discoloration to home fixtures. The Artesia, Grand, and Bath Wells are impacted by a greater or lesser extent with iron and manganese contamination. Lake Park Well does not currently exhibit levels of contamination that would necessitate treatment yet considering that all wells pull water from the same basin, the risk for contamination in all wells is high. The proper understanding of these risks in preparation and planning of improvements to mitigate all these risks is important.
This project will develop plans and specifications for a new iron and manganese removal treatment facility. Treatment through filtration is proposed to ensure that water quality from the well meets the State Water Resources Control Board-Division of Drinking Water (DDW) requirements for drinking water and improvements to the aesthetic appearances. Disinfection of the well water is accomplished with a bulk sodium hypochlorite chemical feed system consisting of a packaged pumping system, bulk storage tank, and chlorine residual analyzer/controller. The well is connected to San Jacinto’s SCADA system and spread spectrum radio links remotely to monitor the site.
Due to the conditions present in the new systems configuration, the Bath Well drainage system will experience additional head loss as water from the well is diverted from its current point of discharge into the existing reservoirs. With the new system, an additional 90-feet of head may be experienced.
Piping will extend from the well to a connection with the proposed treatment facility. Considering that there are numerous vendors with expertise in
delivering iron and manganese removal systems we
will prepare a design with general parameters for
selecting and procuring this equipment. Our
approach includes review of various treatment
solutions to verify the efficiency of the proposed
media and to pre-purchase the treatment
equipment through a qualitative and quantitative
selection process. Other vendors will be considered
in this selection process to ensure that the best
value solution is delivered to San Jacinto.
The removal of iron and manganese from potable
water supplies is affected by various chemical and
physical characteristics of the water. These
characteristics are interrelated, and an accurate and
complete water analysis is essential to identify
potential problems.
Single Vessel FE/MN Treatment System
5.1.a
Packet Pg. 600 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 5
Some factors that affect the iron and manganese removal include the following:
• Time
• pH
• Temperature
• Total Organic Carbon (TOC)
• Dissolved Oxygen
• Ammonia
• Carbon Dioxide
• Langelier Index
Chemical addition of sodium hypochlorite will be introduced to oxidize the iron and any manganese present in the water. A sodium bisulfite addition is also considered herein to remove hydrogen sulfide that may be present in the water matrix. Dechlorination would be needed since the sulfide may be present in the raw water. Considering the chemical concentration of iron present in the water matrix a dosing of chlorine will be required for its oxidation. Reviewing the water quality analysis, the presence of organic material is minimal in the water matrix as indicated by the TOC concentration results.
Manganese is present in the water matrix, while iron is not. We expect to see iron in the water as the nearby wells have shown an iron presence. An additional 0.5 mg/L would be dosed to maintain chlorine residual. Therefore, the oxidation demand for sodium hypochlorite is anticipated to be significant while leaving an appropriate residual in the treated water flow. In light of this it is expected that the existing sodium hypochlorite dosing system does not have sufficient size and capacity to perform iron and manganese oxidation as sulfides may be present in the water matrix.
Our effort has considered the inclusion of an optional sodium hypochlorite storage and metering system if it is determined that the existing system, which consists of a tank and metering pumps, are found to be deficient.
Our design considers two options for treatment of full well production by use of two parallel vessels with or without bypass. The single filtration vessels option minimizes the system footprint as well as capital cost however minimized the operation flexibility and interruption of the flow during backwashing. On the other hand, the dual vessel configuration allows for operational flexibility and eliminates downtime during backwash. The net average result is that when the well is operational it will operate 2 to 3% more when the dual vessel configuration is implemented. Typical downtime caused by backwash operation would essentially be eliminated and if a vessel were out of service the other could be operated.
Alternative 1 – Treatment With Bypass Blend
The option to internally blend water is considered in conceptualizing our approach to the design.
Provided this meets the needs of San Jacinto, it may be an attractive solution to achieve the ultimate objective of treatment. The filtration system has a capacity to treat 2,500 gpm of water when treating all the anticipated flow. If a target concentration of 80% of the secondary MCL were achieved (240 parts per billion iron concentration) thus resulting in 25% of the water to be bypassed, a smaller treatment footprint would be realized as well as savings associated with equipment cost. In this scenario approximately 1,500 gpm of water would be treated resulting in a smaller treatment vessel.
5.1.a
Packet Pg. 601 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 6
This will also result in a smaller footprint for the backwash recovery tank. Ostensibly the backwash rate could be reduced to 1,500 gpm and the backwash tank could be sized at approximately 20,000 gallons (15-feet diameter by 16 feet high). This configuration may also allow for the elimination of a dedicated backwash supply pump. The supply from the distribution system may be of adequate capacity to achieve this lower flow rate. We will include in the design all the necessary valves and fittings to accomplish the bypass operations along with the needed support for permit approval.
Alternative 2 –Treatment Without Bypass Blend
This option involves use of all components specified in Alternative 1 without bypass and blend. In this alternative, we expect two 7-feet to 9-feet reaction vessels for the reaction time attenuation followed by two filter vessels. The footprint of the vessels would be slightly larger than Alternative 1 and backwash flow would be approximately 2,000 gpm. This option will require that the backwash recovery tank be approximately 16-feet diameter by 20-feet high with storage capacity of approximately 27,000 gallons. We will confirm if the existing tank has the sufficient size to meet capacity requirements.
Backwash recovery and production is considered in our efforts and will be sized to accommodate the backwash water generated during normal operations. The backwash system depending on the ultimate option selection will include a backwash supply pump or flow control valve of adequate capacity to fluidize the bed and achieve backwash. Backwash water will be conveyed to the existing backwash recovery tank of sufficient size to accommodate backwash and any rinse water needed.
We will specify the configuration of the tank and analyze the options presented by the equipment vendors to include a means to decant the water to recover over 99% of the utility waters generated during filter backwash. The solids settled in the tank will be collected and conveyed via gravity to the nearest sewer system. A recovery pump having approximately 100 gpm capacity will be included in the equipment vendor package for return of clarified water to the filtration system.
In summary, the improvements proposed for the facility will incorporate the design of basic site civil improvements at the well site, piping configurations, chemical dosing equipment as needed, backwash supply, backwash storage if needed, backwash recovery pumps, a sewer connection, and treatment system improvements at the well site. The existing property will be improved with a new steel storage tank, reaction and treatment vessels, booster pump station, and Bath Well. We anticipate that the iron will be present in the water and our effort will include design of the treatment system for the removal of iron and manganese. A single pass media filtration system will be considered in the design effort to ensure implementation of an appropriate removal method for ultimate drinking water purposes. This equipment shall be incorporated into the overall design of the site and process coupled with the appropriate chemical dosing for iron/manganese removal and solids handling.
Civiltec will prepare improvement plans that design and engineer the necessary civil, structural, electrical and mechanical elements to incorporate this equipment in the treatment process with the assumption that the ultimate equipment and media will be selected and determined during the initial design phases. These systems will be incorporated into the mechanical and structural design. Our effort also considers that the system will be supported through operation of backwash supply and recovery systems and that waste generated during backwash will require sampling prior to discharge to the sewer connection. Water generated during the backwash and rinse process will be clarified in
5.1.a
Packet Pg. 602 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 7
a recovery tank and solids separated from the process will be fluidized and metered to the sewer system. Rinse and backwash water may be recovered and utilized in the treatment process.
The primary objective of our design will be to address the following:
• Design of a new connection to the well pump discharge pipeline, treatment plant and new backwash supply pump system. Water will be directed from the well pump to the treatment plant. After treatment the treated water will be conveyed to the existing reservoirs. It is desired that all water from the Artesia and Bath Wells will be conveyed to the treatment system, which may incorporate an automatic blending system and mixing connecting back into the treated water pipeline. Design will be prepared to achieve 80% of the secondary level for iron and manganese through use of this blending system that will bypass a portion of the flow around the treatment system and ultimately convey flow to be mixed in the pipeline before the distribution system.
• Review of existing electric load and upgrade service center, if needed. This power supply will be coordinated with new panels provided for the new treatment plant system components in the existing building as space may be available in this area to accommodate circuitry for the new pumping equipment and filtration system. Civiltec will prepare the design and coordinate with San Jacinto to ensure that the service connection provided for the well is adequate. Included in our efforts, we will perform an analysis of the existing load capacity of the new motor control center to determine if this system can be expanded to accommodate the additional loading from the treatment system and ancillary components. • Design and engineering of the structural improvements that will support the treatment vessels, reactors (two tanks conceptualized), filter vessels (two tanks conceptualized) backwash water tank (one tank conceptualized), valve trees, piping manifolds, control panels, control panel shade structures, backwash supply pump, wash water rinse recovery pumps and air compressor.
• Design of electrical power facilities that will support operation of the new iron and manganese removal system including the systems and instruments identified in the above bullet, control systems, convenience power, grounding building lighting, and site lighting. • Design of the below and above grade piping manifolds and supports that will convey water to and from the treatment facility, chemical metering solution lines, and above grade air supply piping.
• Design of the final site improvements
including the paving, grading, drainage,
and demolition of the existing facilities.
• Design of a new liquid chemical system
(sodium hypochlorite and sodium
bisulfide) that will be placed within a new
prefabricated building presented as an
option. The system will include the
chemical metering pump to dose bulk
sodium hypochlorite to the system and a
new chemical storage tank having the
Dual Vessel Iron / Manganese Treatment System
5.1.a
Packet Pg. 603 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 8
adequate capacity to store a minimum of two weeks of chemical under maximum flow conditions.
Scope of Work
Civiltec’s scope of services have been arranged into two alternatives. Our basic approach has been identified as Alternative 1 including meeting secondary MCL standards for iron and manganese considering that no options are needed.
Task 1 – Preliminary Design Report
Civiltec will prepare a preliminary design report presenting the design basis considering a review of the existing documentation prepared by San Jacinto. This report will include a preliminary layout, design criteria, hydraulic profile, process flow diagram and permitting issues. Specific tasks are identified in the following paragraphs.
A. Meet with San Jacinto management and staff to formalize design criteria, discuss design issues and schedules and obtain available water quality data, CAD files, plans or documents that they may have in its possession relative to the project.
B. Perform a complete utility and data research of the site. Our objective is to obtain all record information available for the site including record drawings of the site improvements, boundary information, aerial photographs, vertical and horizontal control, title records, geologic data, and geotechnical report prepared for the site by Ninyo and Moore, etc.
C. Civiltec will establish the control survey points that will consist of locating existing survey monuments and will pick up any relevant features along the way. Civiltec will establish control throughout the project using established benchmark and centerline tie information as previously established for the site by San Jacinto.
D. Prepare a base map of the site based on a topographic survey performed by Civiltec and obtain existing improvement plans from San Jacinto in the vicinity of the proposed treatment system pad, to establish horizontal and vertical control for construction and to supplement record data.
Prepare a complete base map of the proposed treatment system site utilizing the survey data and the San Jacinto record maps.
E. Review existing water quality test results. This information will be utilized to conceptualize the water treatment system design.
F. Prepare a site layout showing the treatment system facilities, pump station, disinfection facilities, sodium bisulfide facilities, bypass station including preliminary pad plans and elevations identifying space requirements for the treatment systems, and piping and appurtenant improvements. The layouts will also address the need for various site mitigation improvements including preparation of a Water Quality Management Plan and associated permanent best management practices for treatment of site run-off.
G. Our subconsultant Leighton will perform subsurface exploration, laboratory testing of sampled soils to determine condition of soil, bearing capacity and settlement. A final geotechnical analysis report will be prepared with the recommendations for site grading and seismic site specific conditions.
5.1.a
Packet Pg. 604 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 9
H. Perform a seismic and lateral load analysis of all major pieces of equipment to determine necessary improvements.
I. Review the hydraulic capacity of the existing production wells and review and analyze the well’s ability to deliver the necessary power to the system for conveyance of water through the proposed treatment system to their connection with the distribution system and backwash supply impacts on the existing system if water is to be supplied from the distribution system.
J. Solicit cost and performance information from equipment vendors for the treatment systems.
Perform an analysis and evaluations of iron and manganese treatment equipment systems and improvement alternatives studied and prepare a recommendation for consideration. Ultimately an evaluation will be performed, and selection made such that the design is tailored around the selected vendor’s treatment solution. Evaluation activities will focus on the following criteria:
• Operability
• Installation Cost
• Equipment Cost
• 20-Year Present Value Operation and Maintenance
• Experience
• References
• Warranties
K. Submit a preliminary design report summarizing the findings of the analysis and discussions performed under this task. Recommend a final location of the new treatment and pumping systems based upon input from San Jacinto. The report will describe the treatment process, design assumptions, operating conditions, water quality information and confirmation of conformance with potable water quality requirements. The report will contain a summary section, conclusions and recommendations along with all the backup support data and be prepared at the 80% and 100% level. We will meet with the San Jacinto’s management and staff to discuss the report, remaining project issues and initiating the design phase.
L. Project management will be provided for all phases of the design development and will incorporate the preparation of monthly project schedules or more often as deemed necessary to track progress and achieve successful completion of tasks while staying within budget. Our project management plan consists of identifying project milestones, efficiently navigating through project issues, communicating routinely with San Jacinto in meetings and conference calls, and defining objectives for project execution. As partners, San Jacinto and Civiltec, can achieve the goals established for design completion as expressed in our proposal. We will prepare monthly reports to accompany our invoices along with the schedule. The cost of these efforts are considered in various other tasks of our proposal.
Task 2 – System Final Design
Following San Jacinto’s approval of the preliminary design report, Civiltec will produce plans and specifications for civil, electrical, mechanical, structural, instrumentation, and all other aspects of the project. Final plans and specifications will be prepared in compliance with the preliminary design report and established design criteria for site improvements, treatment and process piping systems to be contained on the foundation slab, and structural improvements and calculations. The drawings will be created in AutoCAD 2019 for Windows in Civil3D on 24-inch x 36-inch size sheets. The site design drawings will identify grading, drainage, mechanical, underground piping on the site, and
5.1.a
Packet Pg. 605 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 10
structural improvements necessary for the design effort. Civiltec will ensure that all input and output signals for the design are included in the communications and that necessary power is distributed to required system components.
A. Design Submittal Phases. We propose to provide three submittals for final approval of the plans and specifications. The following list identifies the key submittals, meetings and design information proposed for each phase of the designs:
• 50% Design. Submit complete designs and plans, specifications table of contents document.
Meet to discuss approximately one week after submittal. • 90% Design. Submit complete designs and plans, first draft of complete specifications document, a narrative of progress addressing outstanding issues and design completion.
Meet to discuss approximately one week after submittal. • 100% Design. Submit complete drawings and specifications document reflecting 90% design review corrections from San Jacinto, Los Angeles County Sanitation District, Regional Water Quality Control Board and DDW for final approval by San Jacinto. Meet when submitted to expedite approval.
B. Technical Specifications. Prepare detailed technical specifications and special provisions to support the drawings and complete the elements of the project. Integrate existing San Jacinto Standard Specifications and Standard Drawings where applicable. Incorporate latest San Jacinto front-end contract documents and general provisions. Develop necessary project specific special provisions. Provide a table of contents for the 50% submittal, and technical specifications and special provisions for the 90% and 100% submittals.
C. Schedule and Opinion of Costs. Prepare a preliminary construction schedule and an opinion of costs for review and use by the San Jacinto.
Civiltec will provide completed, original, signed Mylar and original specifications for use by the contractor and San Jacinto for the construction of the plant and develop the request for proposal and construction documents for San Jacinto’s review and approval.
Task 3 – Bidding Services and Selection of Construction Contractor Civiltec will assist San Jacinto in the bidding and award of the contract documents, which includes:
• Answering contractor’s questions,
• Issuing addenda,
• Attend a pre-bid meeting with potential contractors,
• Reviewing the bids/verifying contractor references, and • Assisting San Jacinto in recommending award of contract.
Task 4 – Permitting
Permitting. Civiltec will issue 90% construction drawings for permitting through the various required agencies. Civiltec will submit plans and specifications for review and permitting to San Jacinto. We will make the required corrections to the submittal until approval is obtained. The permit plan check fee is not included in our budget. Civiltec will also assist San Jacinto with submittal of plans and design memo to DDW to obtain the Permit Amendment to Operate. We will provide data to support San Jacinto in its efforts to complete the application to amend the permit to operate.
5.1.a
Packet Pg. 606 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 11
Task 5 – Construction Support
A. Attend a preconstruction meeting under supervision of the construction manager. Distribute agenda and minutes to project team.
B. Attend regular teleconference meetings with San Jacinto, observer, contractor and participating outside consultants and agencies.
C. Obtain, manage, and review shop drawings, manufacturer's submittals and safety instructions on each phase of the work. Continually track progress of submittals and approvals to ensure contractual compliance. Monthly report on status of submittals will also be issued.
D. Prepare supplementary sketches and details as required to resolve field construction issues, respond to requests for information, clarification, and changes requested by San Jacinto.
E. Arrange and conduct the final observation of work placed into service to be witnessed by the project team. Prepare a “punch list” of all items to be completed by the contractor to obtain final completion and ensure all items are completed.
F. Ensure adequacy of the contractor’s as-built drawings and completeness of the drawings. Update the record drawings from field documentation and issue official as-built drawings to San Jacinto. 2) DESCRIPTION OF EXPERIENCE
Developing strong working relationships with our clients is part of Civiltec’s mission and vision.
Repeat client work represents 85% of our workload. Throughout the past 5 years, we averaged 216 new projects per year. Projects range in size from small to large and have included iron magnesium treatments and experience with several vendor’s including those for Pureflow, Layne, and Filtronics.
This wealth of successful experience, primarily for municipalities, state and federal agencies, demonstrates our ability to deliver projects with complete client satisfaction. Our reputation and the quality of our work is paramount to us. Feel free to contact any of the references included with our select relevant project experience to verify our dedication to providing unique, gainful solutions.
Bluff Street Treatment Plant Upgrades
Owner: City of Norco | 2870 Clark Avenue, Norco, California; Client Pureflow Filtration Division | 6739 Washington Avenue, Whittier, California Reference: Chad Blais, PE, Public Works Director | (951) 270-5678 | [email protected] Patrick Kennedy, Project Manager | (562) 945-3425 | [email protected] Cost: $3,817,876 | Design Dates: June 2017 – April 2018 | Construction Dates: February 2019 – October 2019 As part of the expansion of the existing 1,000 gpm arsenic, iron, and manganese treatment system to a 4,000 gpm, Civiltec designed site civil improvements, piping configurations, chemical dosing equipment, backwash supply pumping, modification of the backwash storage tanks, backwash recovery pumping, a sludge discharge connection and treatment system improvements at the existing treatment site.
The existing electric load and service
center was upgraded for additional
load due to new additional booster
pumps. The previous chemical feed
system was demolished from the
masonry building and a new
5.1.a
Packet Pg. 607 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 12
electrical switchgear and control was relocated into the existing masonry building. This power supply was coordinated with new panels provided for the new treatment plant system components in the existing masonry building as space was available in this area to circuitry for the new backwash supply and recovery pumping equipment and filtration systems.
The electrical power facilities supported operation of the existing and new arsenic, iron and manganese removal system including the systems and instruments. A new liquid chemical system (sodium hypochlorite, sulfuric acid, sodium hydroxide, ferric chloride) was designed under a new canopy and included the chemical metering pumps to dose chemicals to the treatment system and new chemical storage tanks with the adequate capacity to store a minimum of 2 weeks of chemical under maximum flow conditions. California Environmental Quality Act and supporting documents were prepared and filed with the county and state.
Well No. 12 Water Treatment System
Clients: City of Santa Fe Springs | 11710 Telegraph Road, Santa Fe Springs, California Reference: Noe Negrete, PE, Director of Public Works/City Engineer | (562) 868-0511 | [email protected] Cost: $3,794,395.00 | Design Dates: April 2016 – September 2017 | Construction Dates: October 2017 – June 2018 Civiltec designed a new iron, manganese, hydrogen sulfide and color removal water treatment system for Well No. 12. This well can produce groundwater at 2,000 gpm; however, the well was inoperable due to high concentrations of arsenic, iron, manganese, hydrogen sulfide and color, all of which exceed the MCLs established by the DDW under the California State Water Resources Control Board.
The new water treatment system is designed to reduce arsenic, iron, manganese, hydrogen sulfide and color to levels that are at 80% of their respective MCLs. The new treatment system incorporated basic site civil improvement design to ensure that access is not restricted around the well site. Piping was reconfigured to convey water toward the new water treatment system for treatment and then pumped to the Santa Fe Springs distribution system.
Bell Ranch Desalter Treatment Plant Concept Study
Clients: DeSal Water Co., LLC | 2291 N Patterson Road, Oxnard, California Reference: Dave O. White, Jr., Project Manager | (805) 479-4305| [email protected] Professional Service Dates: (Study) August 2014 – September 2015 For over two decades, poor-quality brackish water from discharges upstream have infiltrated the Bell Ranch area, causing the groundwater elevation to rise over 200 feet, even during record drought. The upstream discharge has been contaminating the Bell Ranch groundwater with high levels of chlorides (salts) and rendering this abundant groundwater unusable. By partnering with American Water to establish and operate the desalination facility and working with the Calleguas Municipal Water District’s (CMWD) Salinity Management Pipeline (SMP) for the disposal of the chloride concentrates, the Bell Ranch Desalter can supplement the area’s water portfolio with a sustainable, local source.
Civiltec studied three potential sites and prepared concept plans for the brackish groundwater treatment system. The facility pumps and treats approximately 9,000-acre feet per year (AFY) using
5.1.a
Packet Pg. 608 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 13
reverse osmosis (RO) technologies, with the ability to safely increase demand to 12,800 AFY.
Conservative estimates indicate that approximately 7 million gallons per day of high-quality drinking water could be produced from the Bell Ranch Desalter. The desalter plant improves local groundwater that is not suitable for potable or agricultural use by removing salts and other contaminates through a state-of-the-art RO filtration system. Once treated, the water is provided to CMWD for distribution through their existing water system to Camrosa Water District, parts of Simi Valley and Thousand Oaks, as well as to some local agricultural users.
The chloride concentrates resulting from desalination are discharged into the CMWD SMP, an integral part of the Las Posas Basin Specific Plan. This pipeline, already in place from Bell Ranch to Port Hueneme, carries the discharge to sea in accordance with strict environmental and regulatory
standards. QC of both the discharge and drinking water is monitored by the CMWD to comply with or exceed all state and federal regulations.
Well No. 13 Treatment System Study
Clients: Jurupa Community Services District (JCSD) | 11201 Harrel Street, Jurupa Valley, California Reference: Moustafa Aly, Water Operations and Facilities Manager | (951) 685-7434 | [email protected] Professional Service Dates: February 2019 – June 2019
JCSD wanted to explore solutions for the design of a biological treatment system at groundwater Wells 13 and 6 in response to rising nitrate levels. Civiltec performed an analysis to find the fundamental benefits and drawbacks of each alternative as a treatment solution. This included preparation of an alternatives memo to discuss, analyze and compare biological and ion exchange (IX) nitrate treatment systems. The alternatives analysis compared one IX system from Evoqua and two different biological systems from Microvi and AdEdge. The analysis considered the treatment processes, design criteria, footprint, operation and waste requirements, and capital and operating costs associated with each system.
Based on a technical review of the treatment alternatives explored, Civiltec recommended that JCSD install the Micovi Denitrovi™ System for nitrate removal at Well 13 and blend with water from Well
6. The Microvi Denitrovi™ System provided several benefits, including: a fixed microorganism population, no concentrated residual waste stream, and required less frequent backwashes and generates less wastewater than the Biotta® system offered by AdEdge. DDW issued a final acceptance of the Microvi Denitrovi™ technology, which has also received the NSF/ANSI 61 consumer safety certification. Microvi’s Denitrovi™ technology can be adapted to eliminate many groundwater pollutants – including contaminants such as perchlorate, Chromium-6, and uranium. In fact, Microvi has a line of over two dozen technologies that are almost universal in their applications for public water agencies, water companies, and others with water treatment needs.
5.1.a
Packet Pg. 609 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 14
Chino Desalter II Treatment Plant Air Stripper
Clients: Chino Basin Desalter Authority | 2151 S Haven Ave., Suite 202, Ontario, California Reference: Tom O’Neil, General Manager/CEO | (909) 218-3729 | [email protected] Cost: $2,891,632.73 | Design Dates: August 2018 – January 2020 | Construction Dates: August 2020 – May 2021 To comply with Cleanup and Abatement Order (CAO),
Remedial Action Plan (RAP) and DDW standards, the existing decarbonation system was modified with an air stripper
system to remove trichloroethene (TCE) from the
groundwater treated at the Chino Desalter Authority Desalter II Treatment Plant in Mira Loma. Civiltec evaluated the existing treatment process in relation to TCE removal, as well as determined and designed the necessary modifications to the system to achieve removal of TCE via air stripping to an effluent concentration that meets the requirements of the CAO, RAP and state and Federal drinking water standards. The improvements at the plant replaced the existing decarbonator towers and installed three new air stripping towers with a new slab foundation. The maximum capacity for two of the air strippers is 8,680 gpm, since only a minimum of two air strippers are required to remove TCE.
Civiltec’s design phase included site reconnaissance, field investigation and potholing; water and air quality calculations and evaluation; treatment process analysis and design; geotechnical investigation; constructability analysis; project phasing planning to maintain existing plant operation throughout construction; preparation of construction drawings, specifications, and estimates; regulatory permitting assistance with South Coast Air Quality Management District and DDW; and engineering services throughout the bidding and construction process.
Well No. 16, 1,2,3-Trichloropropane (TCP) Treatment System Clients: R.C. Foster Corporation| PO Box 77055, Corona, California Reference: Robert C. Foster, CEO | (951) 738-8211 | [email protected] Cost: $657,844 | Professional Service Dates: July 2017 – August 2017 The Chino Well 16 supplies water to the residents of the southern eastern part of Chino. The water quality results from the well show a TCP concentration of 29.3 parts per trillion. The year before, the DDW recommended a MCL
at 5 parts per trillion. Since the results were well above the recommended MCL, Chino needed a treatment
solution for this carcinogen. Civiltec provided the
necessary designs and calculations for the treatment
plant.
Civiltec designed the anchor bolt and slab for seismic to support one pair of liquid granular activated carbon (LGAC) Model 10 vessels, providing a concrete foundation. Each vessel contains 20,000 pounds of carbon. The system can treat 800 gpm of water. Civiltec also prepared a prospective prefilter system for the water.
5.1.a
Packet Pg. 610 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 15
The pair of LGAC vessels have been constructed and are displaying the best results. The levels of TCP are showing lower than the MCL the DDW recommended, ensuring customers and residents with healthy and safe water.
Benson and East Side Well Temporary TCP Treatment System Clients: R.C. Foster Corporation | PO Box 77055, Corona, California Reference: Robert C. Foster, CEO | (951) 738-8211 | [email protected] Cost: $4,948,890.66 | Design Dates: August 2017 – December 2017 | Construction Dates: October 2017 – January 2018 The Chino East Side and Benson Wells are one of
the few remaining wells still operating for Chino.
The water quality results from Chino water
sources show an average TCP concentration of 47
parts per trillion. The year before, the DDW
recommended a MCL at 5 parts per trillion and this
regulation were set to go in effect January 2018.
Since the results were well above the
recommended MCL, Chino needed an immediate
treatment solution for this carcinogen.
Civiltec designed the anchor bolt and slab for seismic to support four pairs of LGAC Model 10 vessels, providing a concrete foundation. Each vessel contains 20,000 pounds of carbon. The system can treat 3,500 gpm of water. Civiltec also prepared a prospective pre-filter system for the water.
The pair of LGAC vessels were constructed just as the regulations came in place and are displaying the best results. The levels of TCP are showing lower than the MCL the DDW recommended, ensuring customers and residents with healthy and safe water.
3) PROJECT TEAM & KEY PERSONNEL
Our personnel are experienced surveyors, public works engineers, construction managers and qualified observation staff with combined 312+ years of technical experience.
5.1.a
Packet Pg. 611 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 16
Key staff proposed will not be reassigned or replaced without your prior written authorization.
Civiltec is committed to building the right team for each project, tailored to your specific needs.
C. Shem Hawes, PE | Project Manager
Expertise = Wastewater & Water
Education: B.S. Civil and Environmental Engineering, University of Utah, 2002 Registration: Professional Civil Engineer California No. 69578 Shem is a Principal of Civiltec and has authority to commit all Civiltec’s resources as necessary and take any action necessary to meet your requests. Shem has 19+ years (14+ with Civiltec) of water and wastewater experience. During his tenure at Civiltec, he has been integral in developing relationships with clientele and interacting at multiple levels with business partners and owners to develop solutions for water, wastewater, and public works projects.
He has been the responsible engineer for hundreds of unique planning, design and analytical projects while acting in the role of project manager and/or senior engineer. He has also prepared numerous studies and analysis for several projects requiring environmental review.
Water engineering experience includes the planning, design and construction management of water facilities including pipelines, booster pump stations, reservoirs, and water treatment facilities. Shem has prepared design reports, UWMPs, master plans, drought contingency plans, directed modeling efforts for distribution facilities, developed operations and maintenance manuals, prepared permits through the Department of Public Health and created process and instrumentation diagrams. Shem also heads up our PFAS treatment efforts including media determination, cost benefit, site planning, design of plants, start up and operations.
W. David Byrum, PE | Principal-in-Charge, QA/QC Manager Expertise = Water, Wastewater & Stormwater
Education: Professional Civil Engineer California No. 43296 Registration: B.S., Mechanical Engineering, University of California, Los Angeles, 1977 David is President and Principal Engineer of Civiltec. He is responsible for the overall management of Civiltec’s headquarters office. David has 40+ years (29+ with Civiltec) of experience as a systems planner, design engineer, project manager, principal engineer, and construction manager. He is an expert in the planning and design of water distribution and transmission pipelines, water treatment plants, booster pumping stations, steel and concrete reservoirs, groundwater wells, specialty valving stations, wastewater lift stations, flow equalization stations, wastewater treatment plants, storm drains and street improvement projects. He also prepares regulatory agency compliance reports and technical studies to ensure water purveyors remain in compliance with current regulations. David serves as an expert witness and has been involved in several cases centered on water industry issues, including the Chromium 6 Pacific Gas and Electric (PG&E) case for 6 years.
Steven Walker, PE | Treatment Lead
Expertise = Water & Wastewater
Education: B.S., Environmental Engineering, University of Florida, 1999 Registration: Professional Civil Engineer, California No. 86693 Steven has 22+ years (1+ years with Civiltec) of experience in all aspects of planning, design, and construction oversight of municipal water systems. His experience includes treatment, conveyance, pumping and storage systems. His
5.1.a
Packet Pg. 612 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 17
planning experience includes computerized hydraulic modeling and construction cost estimates of present and future system needs. His background in construction oversight and startup and testing of pumping systems brings the added value of being able to aid in trouble shooting anomalous operational difficulties.
Sanjay Kumar Verma, PE | Structural Lead
Expertise = Water & Wastewater
Education: B.S., Civil Engineering, Birsa Institute of Technology, Jharkhand, India, 1990 Registration: Professional Civil Engineer, California No. 68635 Sanjay has 31+ years (recently joined Civiltec) of engineering experience. He brings a wealth of world engineering skills and specializes in civil and structural design of projects big and small as well as construction management. His vast knowledge includes water and wastewater plants, storage tanks, pipelines, pump stations, reservoirs, renewable energy facilities, LNG, seismic and wind analysis, structural analysis, roadways, and paving, grading and drainage site design. Projects have included reviews and preparatory design plans, calculations, specifications, cost estimation, procurement support, construction phase support, and client, contractor and subconsultant coordination. Structural experience includes evaluation and retrofit design of existing plant structures and foundations, pre-stressed and post-tensioned structural design, load calculations, new structure analysis and design, steel structure seismic detailing, and various equipment foundation designs.
Heber Torres, PE | Electrical Lead
Expertise = Electrical
Education: B.S.E.E., Electrical Engineering, University of Texas, 2000 Registration: Professional Electrical Engineer, California No. 19970 Heber has 19+ years (recently joined Civiltec) of extensive electrical and instrumentation design and project management experience in the water/ wastewater industry. His skillset is predominately within the development of electrical design plans and specifications, control panel fabrication drawing design, analysis and design of wireless communication systems, providing arc flash and coordination studies, lighting/photometric plans, as well as electrical safety procedures per NFPA 70E requirements. Heber is a methodical, budget conscious, and knowledgeable engineer and has worked on electrical design, arc flash analysis, and various other projects throughout Arizona, California, Nevada, and Texas. 4) AVAILABILITY TO BEGIN WORK
Civiltec has immediate staff availability to begin
this project (averaging 20-50% availability) and
see it through completion. We are committed to
providing qualified technical resources to you
throughout the duration of this contract. To ensure
project resource availability we conduct weekly
project manager meetings to review project status
and resource utilization.
Key Personnel Availability
Shem Hawes, PE 30%
W. David Byrum, PE 15%
Sara Canche 20%
Heber Torres, PE 25%
Sanjay Verma, PE 30%
Steven Walker, PE 25%
5.1.a
Packet Pg. 613 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 18
5) ANTICIPATED DELIVERY TIME FOR COMPLETED PS&ES
We utilize the most up to date technologies to manage the production of our projects simultaneously. Based on man-hour estimates and staff availability, project schedules are established for every task using Microsoft Project. These schedules are used to communicate with our clients and staff, so all expectations and budgets are met. On schedule projects are on budget projects! The following proposed schedule is based on our similar experience and our understanding of your project milestones.
Schedule shortened along the time
line to show progress only through
Bidding Phase
5.1.a
Packet Pg. 614 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 19
6) FEE DISTRIBUTION SCHEDULE
Professional fees for the above-described services will are estimated to be provide with the following break down and can be provided on a time and materials or fixed basis as is most convenient for San Jacinto. A summary of our scope of services, calculations, reports, drawing sheets, specifications is included as Attachment A.
Task 1 - Preliminary Design Report................................................................ $68,207.00 Task 2 - System Final Design........................................................................... $162,138.00 Task 3 - Bidding Services and Selection of Construction Contractor... $8,075.00 Task 4 - Permitting................................................................................................. $14,875.00 Task 5 - Construction Support........................................................................... $40,970.00 Total.............................................................................................................$294,265.00 Capacity and impact fees associated with application filings shall be the responsibility of San Jacinto.
Reimbursable expenses, hourly rates and other contract terms and conditions will be provided as described in our contract with you. Civiltec will bill monthly for all work performed and expenses incurred on the project’s behalf.
5.1.a
Packet Pg. 615 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Proposal for Development of PS&E for
Bath Well Site Potable Water Treatment Plant
June 23, 2022 | Page 20
ATTACHMENTS
5.1.a
Packet Pg. 616 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) Responsible Party Project Phase Project Phase
PRELIMINARY AND FINAL ENGINEERING AND DESIGN
Hydrology Calcs for Site Civiltec F PDR
Research Civiltec F PDR
Geotechnical Report and Infiltration Testing Leighton F PDR Rebar X-Ray and Core Drilling Not Required F PDR
LID or WQMP Report and City Permit Civiltec F Permitting City Fire Permit Civiltec F Permitting
City Structural Permit Civiltec F Permitting
City Electrical Permit Civiltec F Permitting
City Grading Permit Civiltec F Permitting
Sewer Waste Permit Civiltec F Permitting
DDW Permit Civiltec F Permitting
Vendor Equipment Evaluation and Selection Civiltec F PDR Prelminary Engineering Report Civiltec F PDR
Operations and Maintenance Monitoring Plans By Others F PDR SWPPP By Contractor F PDR
Payment for Plan Checks By Others F PDR
Potholing and Geophysical Survey By Others F PDR
Site Plan Review City Planning Permit Not Required F PDR Well Hydraulic Calcs Civiltec F PDR
Electrical Load Calcs Civiltec F PDR
Earthwork Calcs Civiltec F PDR
Survey Civiltec F PDR
Basemapping Civiltec F PDR
Process Calculations Civiltec F PDR
Building Code Analysis and Calculations Civiltec F PDR
CEQA (Categorical Exemption) By Others F Permitting
Title 24 Analysis Not Required F PDR
Vessel Anchor Calcs Civiltec F PDR
Vessel Foundation Calcs Civiltec F PDR
Sodium Hypo Tanks Anchor Bolt and Cable Retraint Calcs Civiltec F PDR Piping Systems Structural Calculations Civiltec F PDR
Shade Canopy Structural Calcs Civiltec F PDR
Shade Canopy Foundation Calcs Civiltec F PDR
Coordination, Scheduling and Video Meetings During Design (10 Meetings Assumed) Civiltec F PDR Bidding Services Civiltec BID
Shop Drawing and Submittal Review During Construction Civiltec CM Meetings During Construction Civiltec CM
As-Builds and Adjustments to Plans during Construction Civiltec CM Startup and Commissioning By Others CM
Functional Testing and Commissioning By Others CM
Performance Acceptance Testing By Others CM
RFIs Civiltec CM
Geotechnical Soils and Concrete Testing During Construction By Others CM Arc Flash Study By Others F DESIGN
BIM REVIT MODEL Not Required G DESIGN
Contract Specifications and Cost Estimates Civiltec G DESIGN R-1 Title/Index Sheet Civiltec G DESIGN
R-2 General Notes Sheet Civiltec G DESIGN
R-3 Plant Process Flow Diagram Civiltec G DESIGN
R-4 Design Criteria Civiltec G DESIGN
R-5 Hydraulic Profile Civiltec G DESIGN
O-C-1 General Notes and Symbols Civiltec C DESIGN
O-C-2 Civil Legend and Abbreviations Civiltec C DESIGN
C-1 Site Improvement Plan and Topography (1"=20') Civiltec C DESIGN C-2 Grading Plan Civiltec C DESIGN
C-3 Grading Sections 1 Civiltec C DESIGN
C-4 Plant Piping and Utilites Plan Civiltec C DESIGN
C-5 Plant Piping and Utilites Profiles Civiltec C DESIGN C-6 Sewer Piping and Utilites Plan and Profile Civiltec C DESIGN C-7 Sewer Connection Manhole and Sampling Station Civiltec C DESIGN C-8 General Civil Details Civiltec C DESIGN
C-9 BMP Plan and Details Civiltec C DESIGN
O-S-1 Structural General Notes Civiltec S DESIGN
O-S-2 City Mandatory Requirements Civiltec S DESIGN
S-1 Vessels Anchor Bolt Plan, Structural Plan and Sections and Details Civiltec S DESIGN S-2 Chemical Containment Pad Structural Plan and Sections and Details Civiltec S DESIGN S-3 Waste Tank Structural Pad Plan Sections and Details Civiltec S DESIGN S-4 Shade Canopy Anchorage and Foundation Plan Civiltec S DESIGN S-5 Shade Canopy Structural Plan Civiltec S DESIGN
S-6 Shade Canopy Structural Sections and Elevations Civiltec S DESIGN S-7 Shade Canopy Roof Framing Plans and Sections Civiltec S DESIGN S-8 Structural Details 1 Civiltec S DESIGN
S-9 Structural Details 2 Civiltec S DESIGN
S-10 Structural Details 3 Civiltec S DESIGN
S-11 Pipe Support Details and Sections Civiltec S DESIGN O-PD-1 General Mechanical Symbols Civiltec P DESIGN
O-PD-2 Standard Abbreviation Designation Civiltec P DESIGN PD-1 Vessel System General Arrangement and sections Civiltec P DESIGN PD-2 Chemical System General Arrangement and sections Civiltec P DESIGN City of San Jacinto
Well 34 Nitrate and 1, 2 3 TCP Removal Project
Project Sheet and Calculations Accounting
TASK
W:\Proposals\2022 Proposals\Fullerton\PF22057.00-San Jacinto-Bath Well Potable WTP\Proposal Fee\PF22057SOW 6/23/2022
5.1.a
Packet Pg. 617 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) PD-3 Waste Tank General Arrangement and Sections Civiltec
P DESIGN
PD-4 Filter Vessel Internal Sections and Details CiviltecP DESIGN PD-5 Reclaimed Water Pump Sections and Details CiviltecP DESIGN PD-6 Process piping plan, Details and sections 2 CiviltecP DESIGN PD-7 Chemical Injection Details CiviltecP DESIGN
PD-8 Reclaim Tank Modifications and Floating Decanter General Arrangement Details CiviltecP DESIGN PD-9 Analyzer Details and Injection System Details CiviltecP DESIGN PD-10 Chemical Feed Pump Piping and General Arrangment Details CiviltecP DESIGN PD-11 Chemical Feed Tanks Piping and General Arrangment Details CiviltecP DESIGN PD-12 Process Details CiviltecP DESIGN
PI-1 PID General Notes CiviltecI DESIGN
PI-2 PID Abbreviations and Symbols CiviltecI DESIGN
PI-3 Filter System PID CiviltecI DESIGN
PI-4 Chemical System PID CiviltecI DESIGN
PI-5 Waste Tanks and Reclaim Pump PID CiviltecI DESIGN
E-1 Notes, Symbols and Legend CiviltecE DESIGN
E-2 Demolition Diagram CiviltecE DESIGN
E-3 Single Line Diagram and Panel Elevation CiviltecE DESIGN E-4 Electrical Power and Instrumentation Plan CiviltecE DESIGN E-5 Electrical Lighting and Grounding Plan CiviltecE DESIGN E-6 Control Block Diagram CiviltecE DESIGN
E-7 Pump Wiring and Other Miscellaneous Electrical Diagrams CiviltecE DESIGN E-8 Conduit Schedules CiviltecE DESIGN
E-9 SCADA and PLC Wiring Diagrams and Schedules 1 CiviltecE DESIGN E-10 SCADA and PLC Wiring Diagrams and Schedules 2 CiviltecE DESIGN E-11 Standard Details - Sheet 1 CiviltecE DESIGN
W:\Proposals\2022 Proposals\Fullerton\PF22057.00-San Jacinto-Bath Well Potable WTP\Proposal Fee\PF22057SOW 6/23/2022
5.1.a
Packet Pg. 618 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.)
5.1.a
Packet Pg. 619 Attachment: Proposal from Civiltec Engineering, Inc. (Award of Contract to Civiltec Engineering, Inc.) July 19, 2022
TO: City Council
REQUESTED BY: Michael Maurer, City Attorney
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Ordinance No. 22-08 and Urgency Ordinance No. 22-09 RECOMMENDATION:
Staff recommends that the City Council:
1. Introduce Ordinance No. 22-08, “Ordinance of the City Council of the City of San Jacinto, California, Adding Section 8.24.020 and 8.24.030 to Chapter 8.24 regarding enforcement and penalties of the County of Riverside Ordinance 492;” and
2. Adopt Urgency Ordinance No. 22-09, “Ordinance of the City Council of the City of San Jacinto, California, Adding Section 8.24.020 and 8.24.030 to Chapter 8.24 regarding enforcement and penalties of the County of Riverside Ordinance 492.” BACKGROUND:
On September 17, 2018, Governor Brown signed Senate Bill 946 (SB 946), which limits the City's ability to regulate sidewalk vending. The bill took effect on January 1, 2019, and nullified many current restrictions that cities used to place on sidewalk vending and itinerant vendors.
With the enactment of SB 946, the Legislature amended California Government Code Sections 51036 and 51069 to decriminalize sidewalk vending. On February 5, 2019, the City Council adopted a Code Amendment adding Chapter 5.54 of the San Jacinto Municipal Code imposing regulations on sidewalk vending that are consistent with SB 946.
Staff is recommending an amendment to the City’s Municipal Code to strengthen the City's ability to enforce illegal street vending activities related to food service due to the significant number of complaints received from businesses and residents of the community.
DISCUSSION:
The City has held initial discussions regarding enforcement of illegal sidewalk vending activities. The discussions focused on the City’s ability to deter illegal activities.
The proposed Municipal Code Amendment being presented for the consideration by the City Council would add section 8.24.020 and 8.24.030 to Chapter 8.24, of the San Jacinto Municipal Code so that it is clear that the City has authority to enforce Riverside Ordinance No. 492 dealing with regulating food establishments and food facilities.
Currently, the Municipal Code establishes that the County Director of the Department of Environmental Health Services and his or her duly authorized Environmental Health Specialist
5.2 Packet Pg. 620
has enforcement authority. This amendment would expand the authority to both the City of San Jacinto and the County. Such action would further the City Council finding that, unless properly regulated, sidewalk vending poses a unique risk to the health, safety, and welfare of the public, including, but not limited to, impacts to traffic, pedestrian safety, mobility, unsanitary conditions involving food preparation, risks to children, and consumer protection.
While staff has worked cooperatively and collaboratively with the County Health Department, the County lacks sufficient staff to be out every weekend and evening when most of these activities take place. Adoption of the proposed addition of sections 8.24.020 and 8.24.030 of the Municipal Code will provide City staff with the authority needed to enforce the County’s regulations regarding unlawful food services.
Staff is presenting the City Council with both an urgency ordinance and a standard ordinance.
The standard ordinance will require a second reading at the next meeting and take effect thirty days after approval at the second reading. The urgency ordinance will take immediate effect upon a 4/5 vote of the City Council making findings that the ordinance is necessary for the immediate preservation of the public peace, health, and safety.
Here, unlawful food vendors have continued to serve food in the City of San Jacinto without having a County health permit, and without complying with County health laws. These actions represent an immediate risk to public peace, health, and safety in that these vendors may be serving food that is unsafe and putting the public unwittingly at risk. These actions have been occurring regularly and may be anticipated to continue occurring before a standard ordinance takes effect. Without the additional enforcement tools provided by the urgency ordinance, the City may not be able to effectively prevent such health and safety risks.
FISCAL IMPACT:
There is no fiscal impact related to the adoption of the proposed Code Amendment.
ATTACHMENTS:
Ordinance No. 22-08
Urgency Ordinance No. 22-09
ATTACHMENTS:
Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1
5.2 Packet Pg. 621
Ordinance No. 22-08
STATE OF CALIFORNIA ) ORDINANCE NO. 22-08
COUNTY OF RIVERSIDE )
CITY OF SAN JACINTO )
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
SAN JACINTO, CALIFORNIA, ADDING SECTION 8.24.020
AND 8.24.030 TO CHAPTER 8.24 REGARDING
ENFORCEMENT AND PENALTIES OF THE COUNTY OF
RIVERSIDE ORDINANCE 492
WHEREAS, the City of San Jacinto, California (“City”) is a municipal corporation, duly organized under the California Constitution and laws of the State of California; and WHEREAS, pursuant to the police powers delegated to it by the California Constitution, the City has the authority to enact laws which promote the public health, safety, and general welfare of its citizens, including sidewalk vending, as long as these are consistent with Senate Bill 946 (“SB 946”); and
WHEREAS, in 2018, the California Legislature passed SB 946 which prohibits cities from regulating sidewalk vendors, except in accordance with the provisions of SB 946; and
WHEREAS, SB 946 explicitly stated that the legislation did not affect the applicability of Part 7 (commencing with Section 113700) of Division 104 of the Health and Safety Code, otherwise known as the California Retail Food Code, to a sidewalk vendor who sells food; and
WHEREAS, the City Council finds that this Ordinance is enacted to protect the public health, safety and welfare, unless properly regulated, sidewalk vending poses a unique risk to the health, safety, and welfare of the public, including, but not limited to, impacts to traffic, pedestrian safety, mobility, unsanitary conditions involving food preparation, risks to children, and consumer protection; and WHEREAS, the City Council finds that the addition of Sections 8.24.020 and
8.24.030 to the San Jacinto Municipal Code are necessary to make clear the City’s authority to enforce and issue penalties for violations of Riverside County Ordinance 492; and
WHEREAS, this Ordinance is for the preservation of public peace, health and safety because street vendors have continued to sell food to the public without having a health department permit and without complying with the provisions of Riverside County Ordinance 492 related to public health and safety, and the additional enforcement tools provided through this ordinance are immediately necessary to cease and prevent the illegal sale of food products in the City.
5.2.a
Packet Pg. 622 Attachment: Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance No. 22-09) Ordinance No. 22-08
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN JACINTO DOES ORDAIN AS FOLLOWS:
SECTION 1. Incorporation of Recitals. The above recitals are true and correct and are incorporated herein by this reference as findings in support of this Ordinance.
SECTION 2. Section 8.24.010 of Chapter 8.24 of the San Jacinto Municipal Code is hereby amended to read as follows:
“8.24.010 Provisions adopted by reference.
The city council adopts Riverside County Ordinance 492, inclusive of all amendments and as amended from time-to-time, to allow the county department of environmental health to regulate food establishments and restaurants in the city.
Said ordinance is included as Exhibit A, attached to the ordinance codified in this chapter and on file in the city clerk’s office for public inspection.” SECTION 3. Section 8.24.020 of Chapter 8.24 of the San Jacinto Municipal Code is hereby added to read as follows:
“8.24.020 Enforcement
The City designates both the City of San Jacinto, and any employee thereof or any law enforcement officer providing services for the City, and the Riverside County Department of Environmental Health Services as the enforcement agencies for the purpose of the Riverside County Ordinance adopted by reference in this chapter and all state laws pertaining to the environmental health.” SECTION 4. Section 8.24.030 of Chapter 8.24 of the San Jacinto Municipal Code is hereby added to read as follows:
“ 8.24.030 Violations.
A. It is unlawful for any person to deny access to, interfere with, prevent, restrict, obstruct or hinder the city or the department of environmental health services or their agents acting within the scope of their duty or agency. It shall be unlawful for any person to fail to identify oneself upon lawful request by either the city or the department of environmental health services employees or agents acting within the scope of their duty or agency. Offering physical resistance or bodily attack upon authorized representatives of the city or department of environmental health services acting within the scope of their duty or agency is a misdemeanor.
B. In addition to criminal prosecution, civil action and every other remedy or penalty provided by law, public nuisances may be abated or enjoined in any action brought by either the city or department of environmental health services, or under
5.2.a
Packet Pg. 623 Attachment: Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance No. 22-09) Ordinance No. 22-08
circumstances immediately dangerous to public health or safety may be summarily abated by enforcement officers of either the city or department of environmental health services as provided in this article or otherwise in the manner provided by law for the summary abatement of public nuisances.
C. Any person who violates any provision of the Riverside County Ordinance adopted by this article shall be guilty of a misdemeanor and shall be punished by a fine of not more than $1,000.00 or by imprisonment in the county jail for a term not exceeding six months, or both.
D. Unless otherwise stated in this Chapter, any violation of this Chapter may be prosecuted by the City Attorney as an infraction rather than a misdemeanor in the interest of justice in accordance with Chapter 1.24 of the San Jacinto Municipal Code.”
SECTION 5. CEQA. The City Council finds that this Ordinance is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly.
SECTION 6. Severability. If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this ordinance, or any part thereof, is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portion of this Ordinance or any part thereof. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase thereof, irrespective of the fact that any one or more section, subsection, subdivision, paragraph, sentence, clause or phrase be declared unconstitutional. If for any reason any portion of this ordinance is found to be invalid by a court of competent jurisdiction, the balance of this ordinance shall not be affected.
SECTION 7. Effective Date. This Ordinance is shall be effective 30 days after its adoption.
SECTION 8. Publication. The City Clerk shall certify to the adoption of this Ordinance. Not later than fifteen (15) days following the passage of this Ordinance, the Ordinance, or a summary thereof, along with the names of the City Council members voting for and against the Ordinance, shall be published in a newspaper of general circulation in the City of San Jacinto.
5.2.a
Packet Pg. 624 Attachment: Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance No. 22-09) Ordinance No. 22-08
PASSED, APPROVED and ADOPTED at a regular meeting of the City Council on the 19th day of July, 2022, by the following vote:
AYES:
NAYS:
ABSENT:
ABSTAIN:
________________________________
Alonso Ledezma, Mayor
City of San Jacinto
Attest:
__________________________________
Julia Espinoza, City Clerk
Approved as to form:
__________________________________
Michael Maurer, City Attorney
5.2.a
Packet Pg. 625 Attachment: Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance No. 22-09) Ordinance No. 22-08
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE) ss
CITY OF SAN JACINTO)
CERTIFICATION
I, Julia Espinoza, City Clerk, hereby certify that the attached is a true copy of Ordinance No. _____, introduced by the City Council of the City of San Jacinto, California, at a regular meeting held the 19th day of July, 2022. Ordinance No. __ was approve passed and adopted at a regular meeting held the 19th day of July, 2022. _________________________
Julia Espinoza, City Clerk
5.2.a
Packet Pg. 626 Attachment: Ordinance No. 22-08 - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance No. 22-09) Urgency Ordinance No. 22-09
STATE OF CALIFORNIA ) URGENCY ORDINANCE NO. 22-09
COUNTY OF RIVERSIDE )
CITY OF SAN JACINTO )
AN URGENCY ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF SAN JACINTO, CALIFORNIA, ADDING
SECTION 8.24.020 AND 8.24.030 TO CHAPTER 8.24
REGARDING ENFORCEMENT AND PENALTIES OF THE
COUNTY OF RIVERSIDE ORDINANCE 492
WHEREAS, the City of San Jacinto, California (“City”) is a municipal corporation, duly organized under the California Constitution and laws of the State of California; and WHEREAS, pursuant to the police powers delegated to it by the California Constitution, the City has the authority to enact laws which promote the public health, safety, and general welfare of its citizens, including sidewalk vending, as long as these are consistent with Senate Bill 946 (“SB 946”); and
WHEREAS, in 2018, the California Legislature passed SB 946 which prohibits cities from regulating sidewalk vendors, except in accordance with the provisions of SB 946; and
WHEREAS, SB 946 explicitly stated that the legislation did not affect the applicability of Part 7 (commencing with Section 113700) of Division 104 of the Health and Safety Code, otherwise known as the California Retail Food Code, to a sidewalk vendor who sells food; and
WHEREAS, the City Council finds that this Ordinance is enacted to protect the public health, safety and welfare, unless properly regulated, sidewalk vending poses a unique risk to the health, safety, and welfare of the public, including, but not limited to, impacts to traffic, pedestrian safety, mobility, unsanitary conditions involving food preparation, risks to children, and consumer protection; and WHEREAS, the City Council finds that the addition of Sections 8.24.020 and
8.24.030 to the San Jacinto Municipal Code are necessary to make clear the City’s authority to enforce and issue penalties for violations of Riverside County Ordinance 492; and
WHEREAS, this Urgency Ordinance is for the immediate preservation of public peace, health and safety because street vendors have continued to sell food to the public without having a health department permit and without complying with the provisions of Riverside County Ordinance 492 related to public health and safety, and the additional enforcement tools provided through this ordinance are immediately necessary to cease and prevent the illegal sale of food products in the City.
5.2.b
Packet Pg. 627 Attachment: San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance Urgency Ordinance No. 22-09
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN JACINTO DOES ORDAIN AS FOLLOWS:
SECTION 1. Incorporation of Recitals. The above recitals are true and correct and are incorporated herein by this reference as findings in support of this Ordinance.
SECTION 2. Section 8.24.010 of Chapter 8.24 of the San Jacinto Municipal Code is hereby amended to read as follows:
“8.24.010 Provisions adopted by reference.
The city council adopts Riverside County Ordinance 492, inclusive of all amendments and as amended from time-to-time, to allow the county department of environmental health to regulate food establishments and restaurants in the city.
Said ordinance is included as Exhibit A, attached to the ordinance codified in this chapter and on file in the city clerk’s office for public inspection.” SECTION 3. Section 8.24.020 of Chapter 8.24 of the San Jacinto Municipal Code is hereby added to read as follows:
“8.24.020 Enforcement
The City designates both the City of San Jacinto, and any employee thereof or any law enforcement officer providing services for the City, and the Riverside County Department of Environmental Health Services as the enforcement agencies for the purpose of the Riverside County Ordinance adopted by reference in this chapter and all state laws pertaining to the environmental health.” SECTION 4. Section 8.24.030 of Chapter 8.24 of the San Jacinto Municipal Code is hereby added to read as follows:
“ 8.24.030 Violations.
A. It is unlawful for any person to deny access to, interfere with, prevent, restrict, obstruct or hinder the city or the department of environmental health services or their agents acting within the scope of their duty or agency. It shall be unlawful for any person to fail to identify oneself upon lawful request by either the city or the department of environmental health services employees or agents acting within the scope of their duty or agency. Offering physical resistance or bodily attack upon authorized representatives of the city or department of environmental health services acting within the scope of their duty or agency is a misdemeanor.
B. In addition to criminal prosecution, civil action and every other remedy or penalty provided by law, public nuisances may be abated or enjoined in any action brought by either the city or department of environmental health services, or under circumstances immediately dangerous to public health or safety may be summarily abated by enforcement officers of either the city or department of environmental
5.2.b
Packet Pg. 628 Attachment: San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance Urgency Ordinance No. 22-09
health services as provided in this article or otherwise in the manner provided by law for the summary abatement of public nuisances.
C. Any person who violates any provision of the Riverside County Ordinance adopted by this article shall be guilty of a misdemeanor and shall be punished by a fine of not more than $1,000.00 or by imprisonment in the county jail for a term not exceeding six months, or both.
D. Unless otherwise stated in this Chapter, any violation of this Chapter may be prosecuted by the City Attorney as an infraction rather than a misdemeanor in the interest of justice in accordance with Chapter 1.24 of the San Jacinto Municipal Code.”
SECTION 5. CEQA. The City Council finds that this Ordinance is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly.
SECTION 6. Severability. If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this ordinance, or any part thereof, is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portion of this Ordinance or any part thereof. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase thereof, irrespective of the fact that any one or more section, subsection, subdivision, paragraph, sentence, clause or phrase be declared unconstitutional. If for any reason any portion of this ordinance is found to be invalid by a court of competent jurisdiction, the balance of this ordinance shall not be affected.
SECTION 7. Effective Date. This Ordinance is immediately necessary for the public peace, health and safety, in accordance with the findings herein and as presented on the record, and shall therefore be effective immediately upon adoption.
SECTION 8. Publication. The City Clerk shall certify to the adoption of this Ordinance. Not later than fifteen (15) days following the passage of this Ordinance, the Ordinance, or a summary thereof, along with the names of the City Council members voting for and against the Ordinance, shall be published in a newspaper of general circulation in the City of San Jacinto.
5.2.b
Packet Pg. 629 Attachment: San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance Urgency Ordinance No. 22-09
PASSED, APPROVED and ADOPTED at a regular meeting of the City Council on the 19th day of July, 2022, by the following vote:
AYES:
NAYS:
ABSENT:
ABSTAIN:
________________________________
Crystal Ruiz, Mayor
City of San Jacinto
Attest:
__________________________________
Julia Espinoza, City Clerk
Approved as to form:
__________________________________
Michael Maurer, City Attorney
5.2.b
Packet Pg. 630 Attachment: San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance Urgency Ordinance No. 22-09
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE) ss
CITY OF SAN JACINTO)
CERTIFICATION
I, Julia Espinoza, City Clerk, hereby certify that the attached is a true copy of Ordinance No. 22-09, introduced by the City Council of the City of San Jacinto, California, at a regular meeting held the 19th day of July, 2022. Ordinance No. 22-09 was approved passed and adopted at a regular meeting held the 19th day of July, 2022. _________________________
Julia Espinoza, City Clerk
5.2.b
Packet Pg. 631 Attachment: San Jacinto - Urgency Ordinance - Enforcement Authority (SB 946) (July 13 2022)-c1 (Ordinance No. 22-08 and Urgency Ordinance