Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -2

4.1.2 Soil Categorization
Based on the field screening, excavated soil will be segregated into stockpiles in three categories:
• Background Soil: No visual and odor indicators, and PID measurements that are consistent with background levels. PID readings of up to 5 parts per million by volume (ppmv) will be considered background levels. These soils will be characterized for onsite reuse. • Interim Soil: No visual and odor indicators, and PID measurements between 5 ppmv and 50 ppmv. These soils will be characterized for onsite reuse. If initial findings indicate that this category does not meet onsite soil reuse criteria (see Section 4.2), these soils may be characterized for offsite disposal.
• Contaminated Soil: Staining and odor indicators present, and/or PID measurements of more than 50 ppmv2
. These soils will be further evaluated and are likely to be characterized for offsite disposal (see Section 4.3).

General stockpile management is described in Section 8.

4.1.3 De Minimis Soil
Soil produced during the following activities are considered de minimis:
• Trenching during utility line installation, and similar projects; and • Small excavations during landscaping, fence/sign post installation, and similar projects.

These soils will be field screened and reused to backfill the excavation from which they originated without sampling and laboratory analysis unless categorized as Contaminated Soil. Contaminated Soil and excess soil, if any, will be segregated and stockpiled based on field screening results.

4.2 Onsite Soil Reuse
As mentioned above, a vapor intrusion mitigation system is planned for installation beneath the new commercial building footprint. Other areas of the Site will be used for outdoor parking and loading. These conditions indicate that exposure pathways to COPCs in the subsurface will be managed or incomplete.
2 As defined by BAAQMD Regulation 8, Rule 40, Section 205, contaminated soil has an organic content exceeding 50 parts per million by weight (ppmw) as measured using an appropriate laboratory analysis or registers an organic concentration greater than 50 ppmv as measured at a distance of three inches from the surface of the soil with an organic vapor analyzer.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -3
Based on field screening, de minimis soil may be reused to backfill the excavation of origination.

Background and interim soil stockpiles will be sampled to evaluate onsite reuse in general accordance with the DTSC Information Advisory Clean Imported Fill Material, dated October 2001 (Appendix E).

For onsite soil reuse, a limited set of laboratory analyses are planned:
• VOCs by USEPA Method 8260B (with collection by USEPA Method 5035).

For excavated and stockpiled import material, the following sampling frequency will be used:
• Up to 1,000 cubic yards – one sample per 250 cubic yards. • 1,000 to 5,000 cubic yards – 4 samples for the first 1,000 cubic yards plus one sample per each additional 500 cubic yards.
• Greater than 5,000 cubic yards – 12 samples for the first 5,000 cubic yards plus 1 sample per each additional 1,000 cubic yards.

The analytical results of the import soil samples will be compared to applicable screening criteria to evaluate whether the material is suitable for reuse at the Site. Applicable screening criteria will include DTSC soil SLs3 for direct exposure for commercial/industrial land use.

4.3 Response Measures for Discovery of Potentially Impacted Soil If soil exhibiting evidence of contamination (e.g., visual and odor indicators, and PID measurements of more than 50 ppmv), is encountered during ground disturbing activities, the General Contractor will cease ground disturbing activities in the area and delineate the area with barricades or fencing, stakes and plastic sheeting as appropriate, and signage to notify onsite workers and visitors of access restrictions. The General Contractor will notify the Property Owner and Environmental Consultant. Upon notification, the Environmental Consultant will implement and/or provide oversight for the response measures described in the following sections.

4.3.1 Preliminary Assessment of Potentially Impacted Soil Preliminary assessment of the potentially impacted soil will include confirmation that access control measures installed by the General Contractor are adequate to provide necessary protection to onsite workers and visitors. Air monitoring will be conducted by the Environmental Consultant around the perimeter of the delineated area using a PID to measure organic vapors in the breathing zone. The air monitoring results will be used to adjust the delineated area to provide necessary 3 In order of priority, the SLs are currently available DTSC-modified SLs followed by USEPA RSLs.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -4
protection to onsite workers and visitors. Additional engineering controls (i.e., dust and vapor mitigation and working upwind of the area) and personal protective equipment (PPE) may be required in order to work within the delineated area.

The Environmental Consultant will conduct this preliminary assessment using PID measurements to determine if field observations suggest that the potentially impacted soil are de minimis (i.e., consistent with background levels) or may be a significant risk to human health or the environment (e.g., consistent with the BAAQMD contaminated soil definition).

If field observations (e.g., visual and odor indicators) and PID measurements are consistent with background levels, the suspect conditions will be considered de minimis and the Environmental Consultant will release the delineated area to the General Contractor. If field observations indicate additional evaluation is warranted, ground-disturbing activities will not resume in the area until the procedures discussed in the following section are implemented.

4.3.2 Evaluation of Potentially Impacted Soil
If conditions in the delineated area are not considered de minimis, the Environmental Consultant will evaluate the potentially impacted soil in accordance with the protocols below. • Soil Segregation: Soil samples will be collected using a pre-cleaned hand trowel or drive sampler, transferred into plastic Ziploc bag and observed for evidence of odors and staining and screened for volatile organics using a PID. PID measurements will be used to further segregate soil into de minimis, interim, and contaminated stockpiles. • Stockpiled Soil Samples: For the contaminated stockpile, four discrete samples will be collected and composited by the laboratory for every 250 cubic yards of material or in accordance with the requirements of the disposal/accepting facility requirements. • Sample Handling and Laboratory Analysis: Soil samples will be analyzed for VOCs by USEPA Method 8260B, and may be analyzed for TPHg, TPHd, and TPHmo by modified USEPA Method 8015, Title 22 metals by USEPA Method 6010B/7470 and other constituents as determined by the Environmental Consultant or as part of waste characterization testing for offsite disposal. If necessary, waste extraction test [WET] and/or toxicity characteristic leaching procedure [TCLP] will be conducted to determine if the soil exhibits hazardous characteristics.

Based on the evaluation, options for onsite reuse, or offsite disposal of the affected soil will be developed. After the evaluation is completed, the Environmental Consultant will provide the Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -5
Property Owner, General Contractor, and DTSC with a summary of findings in the Construction Completion Report (Section 10.0).

4.4 Soil Sampling
Discrete samples will be collected using EnCore or Terra Core samplers4 for samples to be analyzed for VOCs. In addition, composite samples will be collected using a pre-cleaned hand trowel and transferred into laboratory-supplied glass containers or drive sampler equipped with stainless steel or brass liners that will be sealed with Teflon tape and capped.

Following soil sample collection, the containers will be labeled for identification and immediately placed in a chilled, thermally-insulated cooler containing bagged ice or blue ice. The cooler containing the samples will then be delivered under chain of-custody protocol to a state-certified laboratory.

4.5 Stockpile Management
Stockpile handling procedures and control measures are discussed in Section 8.1.

4.6 Dust Control Measures
As necessary, dust control measures shall be used during excavation, soil segregation, soil stockpiling, transport, and compaction activities to prevent or control surface and air movement of dust from disturbed soil surfaces. Dust control measures are discussed in Section 6.0.

4.7 Decontamination
Decontamination procedures for construction equipment and personnel shall be developed and followed to minimize residual contamination from leaving the Site during redevelopment activities.

Decontamination procedures are discussed in Section 8.4.

4.8 Soil Importation
If additional fill is imported, the following procedures will be followed for use at the Site. Unless from a documented clean source, soil samples will be collected from the import source for characterization to ensure that soil imported onto the Site is not contaminated. Import fill material will be sampled in accordance with the DTSC Information Advisory Clean Imported Fill Material, 4 U.S. Environmental Protection Agency (USEPA) Method 5035 will be used to minimize VOC loss.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -6
dated October 2001 (Appendix E) for specific laboratory analyses based on the fill source characteristics, as follows:
• TPHg, TPHd, and TPHmo by modified USEPA Method 8015;
• VOCs by USEPA Method 8260B (with collection by USEPA Method 5035); • Semi-Volatile Organic Compounds (SVOCs) by USEPA Method 8270C; • Title 22 Metals by USEPA Method 6010B and 7471A;
• Polychlorinated Biphenyls (PCBs) by USEPA Method 8082; • Asbestos by California Air Resources Board Method 435 (CARB); and • Organochlorine Pesticides (OCPs) by USEPA Method 8081 and chlorinated herbicides by USEPA Method 8151 (for fill source areas formerly used as agricultural land); For in-place import material, the following sampling frequency is required:
• Two acres or less – a minimum of four samples.
• Two to four acres – a minimum of one sample per 1/2 acre. • Four to 10 acres - a minimum of eight samples.
• Greater than 10 acres- a minimum of eight locations with four subsamples per location.

For excavated and stockpiled import material, the following sampling frequency is required:
• Up to 1,000 cubic yards – one sample per 250 cubic yards. • 1,000 to 5,000 cubic yards – 4 samples for the first 1,000 cubic yards plus one sample per each additional 500 cubic yards.
• Greater than 5,000 cubic yards – 12 samples for the first 5,000 cubic yards plus 1 sample per each additional 1,000 cubic yards.

If the chemical properties of an import fill source are verified through documentation, sampling may not be required. Depending on the former land use of the import fill source, additional sampling and analyses than described above may be necessary to properly characterize import fill. The analytical results of the import soil samples will be compared to applicable screening criteria to evaluate whether the material is suitable for import to the Site. Applicable screening criteria will include DTSC soil SLs for direct exposure for commercial/industrial land use and acceptable background levels for metals. Import soil with visual or olfactory evidence of petroleum hydrocarbons is prohibited.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 4 RMD ENVIRONMENTAL SOLUTIONS, INC. -7

4.9 Concrete Reuse
In an effort to reduce impacts to the neighboring community and minimize carbon emissions from trucking, onsite reuse of concrete and asphalt produced during demolition of the current buildings and pavement is planned. Concrete will be crushed onsite and reused as fill material. Asphalt will be incorporated into new pavement surfaces.

4.10 Backfilling
Portions of the Site will be backfilled in accordance with the grading plan for the Site. A plastic liner will be placed to demarcate the contact between fill material and native soil.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 5 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

5.0 CONTINGENCY MEASURES FOR DISCOVERY OF

UNEXPECTED UNDERGROUND STRUCTURES
In the event USTs or other buried structures are unexpectedly encountered during redevelopment activities, the following procedures will be followed. USTs may be identified during redevelopment activities by the presence of vent pipes that extend above the ground surface, product distribution piping that leads to the UST, fill pipes, backfill materials, or the underground structure itself. Other buried structures may not have features that extend above ground surface and could be discovered only after exposed by construction equipment. Discovered structures will be assessed as follows:

5.1 Initial Response
If unexpected underground structures, including tanks, vaults, sumps, containment structures, separators, or piping, that has previously contained or has the potential to contain hazardous materials are encountered during redevelopment activities, the General Contractor will notify the Property Owner and the Environmental Consultant within 24 hours of initial discovery. Upon notification, the Environmental Consultant will notify the DTSC and the SLESS, which is designated as the Certified Unified Program Agency (CUPA). The CUPA consolidates, coordinates, and makes consistent the administrative requirements, permits, inspections, and enforcement activities associated with the regulation of hazardous materials and hazardous wastes in the City of San Leandro through various programs. The DTSC and the SLESS will be consulted regarding appropriate next steps.

In accordance with the Site HASP, appropriate measures will be implemented to ensure worker safety in areas where unexpected conditions are encountered. The General Contractor or designated Health and Safety Officer will be responsible for evaluating any change in Site conditions and may stop work to determine if the level of Site security and PPE is adequate. If warranted, the area where the unexpected condition is encountered will be secured with barricades or fencing, and plastic sheeting as appropriate, and signage will be installed to prevent unauthorized access to the area.

5.2 Assessment of Discovered Underground Structures
Discovered underground structures will be assessed as follows:
• The structure will be inspected to assess whether it contains any indication of chemical residuals or free-phase liquids other than water. This assessment will be conducted by the Environmental Consultant and will be based on visual evidence and the results of vapor Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 5 RMD ENVIRONMENTAL SOLUTIONS, INC. -2
monitoring using a PID. Under no circumstances will any personnel enter an unknown subsurface structure at any time;
• If chemicals are not indicated within the structure by the above-referenced means, and with DTSC and SLESS approval, the structure may be removed or abandoned in place in a safe manner by an experienced and licensed contractor. If warranted, permits will be obtained from the SLESS prior to removing the underground structure; • If liquids or solids are present within the structure, measures will be taken to contain the liquids to avoid spills to the subsurface. Liquids will be contained either in the structure or, if leaking, via spill control methods such as absorbent material and pumping to a storage tank. Samples of the liquid will be collected and submitted to a state-certified laboratory for analysis as determined by the Environmental Consultant or as part of waste characterization testing for offsite disposal. Based on analytical results, the liquids or solids will be disposed of in accordance with applicable environmental laws and disposal requirements;
• If contaminated liquid or solids are present in the structure, the structure will be inspected for physical integrity following removal of the contaminated media. The Environmental Consultant will document the results of this inspection, including an estimation of the volume and former use of the structure;
• If the physical inspection of the structure suggests that chemicals may have been released to the underlying soil, additional environmental sampling will be conducted to assess whether over-excavation is warranted;
o If, based on the opinion of the Environmental Consultant, DTSC, and SLESS, it is assessed that the structure is intact, that subsurface releases of the chemicals to the underlying soils likely did not occur, and no free-phase liquids or chemical residues remain inside, removal of the structure may not be required for environmental reasons.
o Otherwise, with DTSC and SLESS approval, the structure will be removed and disposed of in accordance with applicable environmental laws and disposal requirements. Once the structure is removed, soil adjacent to and beneath the structure will be assessed for contamination through visual observation and PID response and the results documented. If soil is considered “contaminated soil” as defined by the BAAQMD, the appropriate response will be determined in consultation with the DTSC and SLESS.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 6 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

6.0 EROSION, DUST, AND ODOR MANAGEMENT
Once the pre-construction ground surface is stripped from the Site, the exposed soil will become susceptible to erosion by wind and water. Depending on soil and weather conditions, airborne dust and fugitive emissions may be produced. Therefore, erosion control measures and dust control measures will be established before construction begins. Emission (dust) control measures will, at a minimum, comply with those established by OSHA and the BAAQMD for construction-related activities. Dust control measures will be based on "Best Management Practices" (BMPs) and will be used throughout the phases of redevelopment. Standard dust and fugitive emissions control measures will be followed during the redevelopment activities to accomplish the following goals:
• Reduce the potential for health impacts to onsite workers and visitors; • Reduce the potential for health impacts to offsite receptors; • Prevent violations of ambient air quality standards;
• Minimize nuisance dust complaints from offsite receptors; and • Minimize the migration of contaminants adhered to fugitive dust particles outside the Site.

6.1 Construction Mitigation Measures
The following basic construction mitigation measures will be implemented in accordance with recommendations in the BAAQMD California Environmental Quality Act Air Quality Guidelines (BAAQMD, 2017):
• Exposed surfaces (e.g., parking areas, staging areas, graded areas, and unpaved access roads) will be watered two times per day, weather dependent. Alternately, soil binders can be applied in areas that will remain unused;
• Haul trucks transporting soil or other loose material offsite will be covered; • Prior to entering public roads, visible loose soil will be removed from the vehicle exterior using dry methods (e.g., shovels and stiff-bristled brooms or brushes). If visible mud or dirt is tracked-out onto adjacent public roads, a wet power vacuum street sweeper will be used.

The use of dry power sweeping is prohibited;
• Vehicle speeds on unpaved roads will be limited to 15 miles per hour (mph); • Roadways, driveways, and sidewalks to be paved will be completed as soon as possible.

Building pads will be laid as soon as possible after grading unless seeding or soil binders are used;
Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 6 RMD ENVIRONMENTAL SOLUTIONS, INC. -2
• Idling times will be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure 13 CCR 2485). Clear signage will be provided for construction workers at all access points;
• Construction equipment will be maintained and properly tuned in accordance with manufacturer‘s specifications. Equipment will be checked by a certified mechanic and determined to be running in proper condition prior to operation; and • A publicly visible sign that includes the General Contractors name and telephone number to contact regarding dust complaints will be posted. When contacted, the General Contractor will respond and take corrective action within 48 hours. The BAAQMD’s phone number will also be visible to ensure compliance with applicable regulations.

6.2 Dust Suppression Measures
If dust is excessive, one or more of the following mitigation measures may be implemented:
• Apply water or (non-toxic) soil stabilizers to unpaved access roads, parking areas, and staging areas;
• Sweep (with wet power sweepers) paved access roads, parking areas, and staging areas; • Cover or otherwise stabilize exposed soil stockpiles; and • Suspend redevelopment activities that cause visible dust plumes and odors to extend beyond the limits of the Site.

6.3 Contingency Measures for Odor and Vapor Suppression By controlling the dust as described above, the emission of odor and vapors will be reduced to levels that likely will not pose a risk to the health of the onsite workers and visitors. The water spray used to control dust will also significantly reduce the emissions of any potential volatiles that may be present in the soil. The selective loading and transportation of impacted soils could minimize the use of soil stockpiling, further reducing potential emissions of volatiles. Any active stockpile of contaminated soil will be properly covered with plastic so emissions of volatiles will be minimized.

If odor is excessive and vapor emissions are detected, one or more of the following contingency measures may be implemented:
• Apply water or water containing a non-toxic biodegradable deodorizer, odor suppressing foam, or other odor mitigation agents to exposed soil using various applications such as spray or mist;
Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 6 RMD ENVIRONMENTAL SOLUTIONS, INC. -3
• Alternative work sequencing, such that excavation of soil with potential odor during mid-day or afternoon (during hot weather) is avoided;
• Any highly odorous soil could be segregated and placed inside a roll-off bin equipped with a lid. This will minimize the amount of highly odorous soil handling; and • Balancing the excavation with transportation so that the need for large stockpiles is reduced.

The equipment proposed for the Site redevelopment will be maintained properly so that exhaust emissions will be within acceptable standards. The General Contractor will notify the Property Owner of complaints, if any, and record any corrective actions implemented to control odors or vapors in a daily field log.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 7 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

7.0 GROUNDWATER MANAGEMENT
The depth to groundwater at the Site is typically encountered at depths of approximately 5 to 7 feet bgs. In general, construction worker receptors will be performing activities consistent with this SGMP and a Site HASP. The HASP will require the use of proper PPE and the BMPs will require dewatering to preclude any direct contact with groundwater for workers at the Site.

Construction dewatering effluent, if produced, shall be pumped into holding tanks or United Nations (UN)-rated 55-gallon drums with appropriate labeling and secondary containment. If dewatering effluent is to be discharged to the storm drain, a National Pollutant Discharge Elimination System (NPDES) permit will be obtained from the Regional Water Quality Control Board.

If dewatering effluent is to be discharged to the San Leandro Water Pollution Control Plant, an industrial pre-treatment permit will be obtained from the SLESS.

Chemical analysis will be performed in accordance with the receiving facility’s requirements prior to discharge. If concentrations exceed the limits established for the discharge point, the dewatering effluent will either be (1) transferred into a vacuum truck or properly labeled UN-rated 55-gallon drums and transported offsite for disposal at an appropriately-licensed disposal facility or (2) treated and discharged following sampling and analysis to confirm compliance with permit requirements.

The treatment system of the dewatering effluent would include a holding tank, sediment filters, and two carbon vessels to treat the effluent prior to storm drain or sanitary sewer discharge. The sizing of components will depend on the water volumes produced and Site logistics. A typical treatment system schematic is shown in Figure 6.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 8 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

8.0 WASTE MANAGEMENT

8.1 Soil Stockpile Management
Soil that is placed in temporary stockpiles will be maintained to prevent runon/runoff and fugitive dust emissions. The soil stockpile will be covered with plastic sheeting and bermed to prevent (1) erosion or leaching of contaminants to underlying soil, (2) exposure to precipitation and wind, and (3) the runoff of potential contaminants to surrounding areas. Plastic sheeting that covers the soil stockpile will be secured using sand bags or equivalent. The perimeter berm will be constructed with hay bales, dimensional lumber, or other equivalent methods. Following removal, the soil stockpile area will be restored to a pre-stockpile condition. Residual plastic or debris will also be disposed of following stockpile removal.

If soil stockpiling of potentially impacted soil is to be performed, an appropriate stockpile location will be established and stockpiled soil will be placed on plastic sheeting. Stockpiled soil will be secured with a berm (bottom plastic sheeting will be lapped over the berm materials), covered to control dust, profiled, and appropriately managed as described in the following sections.

8.2 Offsite Disposal
Soil that is not suitable for reuse will be transported offsite for disposal at a facility that possesses a current permit to accept the produced soil. The following website can be consulted to determine permitted facilities:
• https://www2.calrecycle.ca.gov/SolidWaste/Site/Search Prior to disposing soil at an appropriately-licensed disposal facility, soil samples will be collected from the potential excavation area or stockpiled for characterization based on the source characteristics and disposal facility requirements. These requirements will be confirmed by the General Contractor and coordinated with the proposed receiving facilities prior to initiating soil sampling.

8.3 Soil Handling, Loading, and Transporting Procedures Following acceptance of the soil by an appropriately-licensed disposal facility, the soil will be loaded in licensed haul trucks (end-dumps or transfers) and transported offsite following appropriate California and Federal waste manifesting procedures. The General Contractor, on behalf of the Property Owner, will be responsible for tracking final soil dispositions. Shipments of waste will be Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 8 RMD ENVIRONMENTAL SOLUTIONS, INC. -2
tracked with the appropriate bill of lading or waste manifests, which will be provided to the Property Owner following completion of the redevelopment activities.

Transportation equipment will be chosen to safely transport the expected volumes of soil, taking into consideration the types of roads to be traveled and their loading capacity. The appropriate bill of lading or waste manifest documentation will be provided by the General Contractor to truck drivers hauling the soil offsite. As each truck is filled, an inspection will be made to verify that the load is securely covered, to the extent practicable, and that the tires of the haul trucks are reasonably free of accumulated soil prior to leaving the Site. During loading, dust and odor emissions will be monitored and mitigated as necessary. During transportation, the hauling trucks will be equipped to fully cover soil and debris, such as with a heavy tarpaulin. A street sweeper will be made available, as needed, to keep the loading area clean. The soil will be wetted, as necessary, to reduce the potential for dust generation during loading and transportation activities.

Transportation activities will be performed in strict compliance with Federal, State, and County regulations and ordinances. Hauling contractor(s) used to transport soil will be fully licensed and permitted by the State of California. For hazardous waste haulers, the selected transportation company will be certified by the State of California as a hazardous waste hauler, and appropriately permitted to haul contaminated waste material. Department of Transportation (DOT) and California Highway Patrol (CHP) safety regulations will be strictly followed by both hazardous and nonhazardous waste haulers.

Transportation routes will be developed to minimize transporting the affected soil through residential areas. The affected soil will be transported via surface streets to the closest suitable freeway, which is Interstate 880. The proposed routes for transportation to Interstate 880 are as follows:
• To Interstate 880 North and South: Leaving the Site along Doolittle Drive, travel southeast approximately 0.25-miles to Davis Street. At Davis Street, make a left-hand turn. Travel east along Davis Street approximately 0.6 miles to the I-880 north and south ramps. Use the appropriate ramp to enter I-880.

The remainder of the freeway route(s) will be established upon selection of the appropriate offsite destination.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 8 RMD ENVIRONMENTAL SOLUTIONS, INC. -3

8.4 Decontamination Procedures
In order to prevent residual contamination from leaving the Site by construction equipment and personnel during redevelopment activities, the following decontamination procedures will be followed:
• Trucks used to transport soil will be loaded in a manner to minimize soil spillage and fugitive dust.
• To minimize the spread of contaminated soil, equipment will be cleaned prior to movement out of active work zones in impacted areas. The equipment wheels/tires will be cleaned by means of shovels and stiff-bristled brooms or brushes until they are fully cleaned. Upon completion of cleaning, any debris will be placed in the appropriate transportation vessel and the plastic sheeting will be disposed. Equipment exiting the Site will be inspected and logged for compliance with the Site decontamination requirements. • Disposable PPE will be removed and properly discarded. The Site HASP will address decontamination of reusable PPE.

8.5 Wastewater and Groundwater Management
Wastewater produced during redevelopment activities, such as decontamination liquids, will be temporarily stored onsite. Decontamination water will be profiled and transported to an appropriate disposal or recycling facility.

If a saturated zone that produces accumulated water is encountered during redevelopment activities, groundwater management protocols as discussed in Section 7.0 will be followed.

8.6 Spill Response Plan
In the event of a spill, the General Contractor will be responsible and prepared to respond in a safe and efficient manner, specific to the particular spill situation. Consistent procedures will be used for handling of spills, whether they are onsite spills or spills occurring during transportation. Haulers will have an Emergency Spill Contingency Plan (ESCP) to ensure that drivers and dispatchers know their responsibilities in the unlikely event that an accidental spill occurs while transporting contaminated material offsite. The drivers and dispatchers will be required to know the procedures for emergency spill response. The ESCP will meet or exceed Federal, State, and County regulations currently in effect. The provisions of the ESCP will be strictly adhered to, in order to ensure continued protection of the public safety and the environment. The HASP will address the handling of onsite spills.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 9 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

9.0 STORMWATER MANAGEMENT
Stormwater pollution controls shall be implemented by the General Contractor to minimize sediment runoff in stormwater. BMPs including grading the Site and installing stormwater control devices such as temporary earth berms or erecting silt fences around the perimeter of exposed soil at the Site, shall be implemented to prevent erosion and sediment runoff from the Site. Straw bale barriers or sediment traps are required to protect any existing catch basins or drainage channels. A separate stormwater pollution prevention plan (SWPPP) shall be provided by a Qualified SWPPP Developer (QSD) prior to beginning redevelopment activities.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 10 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

10.0 WRITTEN RECORDS AND REPORTING
During redevelopment activities, soil and/or groundwater sampling, removal and management of discovered underground structures, chemical analysis and proper disposal of contaminated materials, and soil import activities will be documented in a daily field log by the General Contractor and/or Environmental Consultant. At the completion of the redevelopment activities, a Construction Completion Report will be prepared by the Environmental Consultant for submittal to DTSC that summarizes the soil and groundwater handling activities. The report will include at a minimum the following, as applicable:
• Impacted Soil – origin, volume, characterization, and destination (disposed of offsite); • Discovered Underground Structures – type, contents, characterization, and destination (abandoned in place or disposed of offsite);
• Dust Complaint Logs – time, name and contact information, complaint description, and measures taken to mitigate dust;
• Groundwater – volume of groundwater that is removed, characterization, treatment, and destination (used as dust suppression or disposed of offsite); • Offsite Disposal Records – date, time, vehicles used for the trip, volume/weight, copies of bills-of-lading, and waste manifests;
• Imported Soil – origin, volume, and characterization; and • Analytical Reports – copies of laboratory analytical results.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 11 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

11.0 REFERENCES
Bay Area Air Quality Management District (BAAQMD), 2017. California Environmental Quality Act Air Quality Guidelines. May.

County of Alameda, 2012. Covenant to Restrict Use of Property, Environmental Restriction, County of Alameda APNs 77A-741-4-2 and 77A-741-5, Former Kaiser Aerotech Site, DTSC site code number 20559. September 7.

Department of Toxic Substances Control (DTSC), 2004. Imminent and Substantial Endangerment Determination and Order and Remedial Action Order, Docket No. IS&E 03/04-013, effective date 26 June.

DTSC, 2011. Guidance for the Evaluation and Mitigation of Subsurface Vapor Intrusion to Indoor Air (Vapor Intrusion Guidance). October.

DTSC, 2013. DTSC Letter to Ann Becher-Smead, Redemco LLC for Former Kaiser Aerotech Facilities located at 880 Doolittle Drive and 498 Hester Street, San Leandro, California.

January 23.

DTSC, 2014. Human Health Risk Assessment (HHRA) Note Number 5, Health-based Indoor Air Screening Criteria for Trichloroethylene (TCE). August 23.

DTSC, 2019. Human Health Risk Assessment (HHRA) Note Number 3, DTSC-modified Screening Levels (DTSC SLs). Human and Ecological Risk Office (HERO). April.

ETIC Engineering, Inc. (ETIC), 2002. Supplemental Site Investigation and Human Health Risk Assessment. Former Kaiser Aerotech Facilities, 880 Doolittle and 498 Hester Street, San Leandro, California. December.

RMD Environmental Solutions, Inc. (RMD), 2020a. 2020 Annual Groundwater Monitoring Report, Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. May 26.

RMD, 2020b. Indoor Air and Subslab Vapor Sampling Report, Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. May 29.

RMD, 2020c. Redevelopment-Related Groundwater Monitoring Well Network Modification Work Plan, Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. November 19.

RMD, 2020d. Soil Vapor Sampling Report, Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. November 30.

RMD, 2021a. Supplemental Soil Vapor Sampling Report, Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. January 29.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 11 RMD ENVIRONMENTAL SOLUTIONS, INC. -2
RMD, 2021b. Vapor Intrusion Human Health Risk Assessment for Future Commercial Worker Receptors. Former Kaiser Aerotech Facilities, 880 Doolittle Drive and 498 Hester Street, San Leandro, California. May 20.

U.S. Environmental Protection Agency (USEPA), 2015. OSWER Technical Guide for Assessing and Mitigating the Vapor Intrusion Pathway from Subsurface Vapor Sources to Indoor Air. Office of Solid Waste and Emergency Response. June.

USEPA, 2021. Regional Screening Levels (TR=1E-06, HQ=1). May.

Revised Soil and Groundwater Management Plan
880 Doolittle Drive and 498 Hester Street, San Leandro, California June 11, 2021 12 RMD ENVIRONMENTAL SOLUTIONS, INC. -1

12.0 LIMITATIONS
This document was prepared for the exclusive use of Leandro Brookshire LLC and DTSC for the express purpose of complying with DTSC requirements. This SGMP does not address issues related to other chemicals or media that may be encountered during construction or other activities including, but not limited to, demolition and construction debris, asphalt, concrete, asbestoscontaining building materials, lead-based paint, or any chemicals brought onsite by workers. If such materials are encountered during a project, each Contractor is responsible for complying with all applicable laws pertaining to the handling and disposal of these materials.

This SGMP is based on current known Site conditions and current laws, policies, and regulations as of publication. RMD has used professional judgment to present the findings and opinions of a scientific and technical nature. The opinions expressed are based on the conditions of the Site existing at the time of the field investigation, current regulatory requirements, and any specified assumptions. The presented findings and recommendations in this report are intended to be taken in their entirety to assist Leandro Brookshire LLC and DTSC personnel in applying their own professional judgment in making decisions related to the Site. No warranty or guarantee, whether expressed or implied, is made with respect to the data or the reported findings, observations, conclusions, and recommendations.

FIGURES
San
Francisco
Bay
Drainage Channel SITE VICINITY MAP

FORMER KAISER AEROTECH

FACILITIES

SAN LEANDRO, CALIFORNIA
Project:

Date:

Drawn:

Approved:
01-KAF-001
10/12/18
ZA
KR

SCALE IN FEET
0 2,000
FIGURE
1 After Apex, 2017
Map Source:

National Geographic TOPO!
Outdoor Recreation Mapping Software, 2007
N
FORMER

KAISER AEROTECH

FACILITIES
LMW-1 LMW-2 LMW-3 LMW-4 LMW-5 LMW-7 LPZ-2 LPZ-3 LPZ-5 MW-27 PZ-1 RW-12 RW-13 RW-5 RW-6 RW-7 UB-2 LB-3 LB-4 LB-5 LB-6 LMW-8 LMW-10 UB-3 UB-4 UB-5 UB-6 MW-1 MW-11 MW-13 MW-16 MW-17 MW-18 MW-20 MW-21 MW-22 MW-23 MW-24 MW-25 MW-26 MW-3 MW-4 MW-6 MW-5 MW-8A MW-9 PZ-2 MW-28 MW-29 F-2 FA-1 FUB-1 RW-8 MW-19 LMW-9 LEGEND A-zone Monitoring Well B-zone Monitoring Well Former Kaiser Aerotech Facilities Boundary Note: Wells F-2 and MW-27 are screened across portions of the A- and B-zones. Proposed Above-Grade Parking on Canopy Structure SITE PLAN WITH PROPOSED REDEVELOPMENT 100500 Scale (feet) 2 After Apex, 2017 Basemap from Secor, June 25, 2002 N FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA 11/2020 DATE FIGURE Proposed On-Grade Parking/Loading 742 746 750 NCELINE 754 CANOPY CE/EXIT ONLY SSOCIA MONUMENT SIGN 80 mi OKS SHELTER barrier fence VAN
DRW
SI
_T y 97-FT van
stall. HP
RAILROAD/ western BOUNDARY
ORME"
hl/solven FORAGE
-^sK»
OPOSE
GENCY
ATE.

T y 27-FT VAN
QUEUING^STALL, TYP.
proposed additional

TRASH ENCLOSURE
pntraKe/exit ON^\ TRUCK
Iproposed tdr entrance

PROPOSED MAIN
ENtas^
i'*
UCK
.-i-i—FT X 60-FT

LOADING ST
aEGREAS'NL former

PROPOSED BUILDING
total
PROPOSED DSP entrance
TE LOCATIONS approx COLUMNS, TYP. OF CANOP
LMW-1 LMW-2 LMW-3LMW-5 LMW-7 PZ-1 RW-12 RW-13 LB-3 LMW-10 UB-3 UB-6 MW-1 MW-13 MW-16 MW-17 MW-18 MW-20 MW-21 MW-22 MW-23 MW-24 MW-25 MW-26 MW-4 MW-5 MW-6 MW-8A MW-9 PZ-2 MW-28 MW-29 F-2 FA-1 FUB-1 RW-8 CB-28 MW-3 LMW-4 LB-5 LMW-8 UB-5 LPZ-2 LPZ-3 LPZ-5UB-2 MW-11 MW-19 MW-27 LB-6 LMW-9 RW-5 RW-6 RW-7 LB-4 UB-4 LEGEND A-zone Monitoring Well B-zone Monitoring Well Former Kaiser Aerotech Facilities Boundary Note: Wells F-2 and MW-27 are screened across portions of the A- and B-zones. SITE PLAN WITH GROUNDWATER WELL NETWORK AND SHALLOW SOIL MANAGEMENT AREAS 100500 Scale (feet) 3 After Apex, 2017 Basemap from Secor, June 25, 2002 N FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA 10/2020 DATE FIGURE Shallow Soil Land Use Restriction Area MW-13 NM MW-15 NM MW-17 3.19 MW-19 6.91* MW-20 NM MW-21 NM MW-23 5.05 MW-24 6.73 MW-25 NM MW-26 4.60 MW-3 NM MW-4 NM MW-8A NM MW-9 5.24 PZ-2 4.86 MW-29 5.27 MW-16 NM FA-1 3.23 MW-7 NM MW-5 NM MW-12 NM MW-22 5.29 MW-1 5.90 MW-6 NM MW-11 5.52 5.0 6.0 4.0 MW-18 2.85 MW-28 2.84 3.0 5.0 ? ? ? ? ? ? ? ? 3.23 A-zone monitor well Groundwater elevation (feet) relative to mean sea level (msl)
Approximate groundwater elevation contour
(feet msl)
Approximate sand lens boundary between
5 and 10 feet below ground surface
(ETIC, December 27, 2002)
Former Kaiser Aerotech Facilities boundary Not Measured 05/08/20 DCB KR01-KAF-004 PROJECT NO. APP. BY:DRAWN BY:DATE HORIZONTAL SCALE IN FEET 0 120 240 FIGURE 4 A-ZONE GROUNDWATER ELEVATION MAP- MARCH 2020 LEGEND FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET * Not used in contouring SAN LEANDRO, CALIFORNIA 5.0 After Apex, 2017 N Basemap from Secor, June 25, 2002 NM 1 11 1 1 1 1 1 1 1 11 1 1 11 1 1 1 LPZ-3 5.24 RW-5 5.23RW-6 5.17 RW-7NM UB-2 5.64 PZ-1 5.56 LB-5 5.41 UB-5 NM LMW-8 NM LPZ-5 5.16 LPZ-2 5.37 UB-3 5.24 LB-4 5.03 UB-4 5.03 RW-8 4.82*RW-12 4.36LMW-10 4.15 LB-6 LMW-2 4.32 4.34 LMW-3 4.65 FUB-1 3.05 F-2 3.15 LMW-92.74 RW-13 4.30 LMW-1 5.74 LB-3 5.49 UB-6 3.70* LMW-4 NM 4.55.5 5.0 4.0 4.0 3.5 MW-27 2.97 3.0 LMW-5 NM LMW-7 NM 4.5 ? ? ? ? ??? ? ? ? 01-KAF-004 05/08/20 DCB KR PROJECT NO. APP. BY:DRAWN BY:DATE HORIZONTAL SCALE IN FEET 0 120 240 FIGURE 5 B-ZONE GROUNDWATER ELEVATION MAP - MARCH 2020 FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA After Apex, 2017 N Basemap from Secor, June 25, 2002 5.19 5.0 Former Kaiser Aerotech Facilities Boundary B-zone Monitoring Well Groundwater Elevation in Feet Above Mean Sea Level (feet msl) Approximate Groundwater Elevation Contour (feet msl) Total B-zone Coarse-Grained Soil Thickness Greater Than 1 Foot * Not Used in Contouring Note: Wells F-2 and MW-27 screen portions of A- and B-zones NM Not Measured LEGEND

STORMDRAIN OR

SANITARY SEWER

DISCHARGE

EXCAVATION HOLDING TANK FILLER BAGS AQUEOUS PHASE
CARBON #1

AQUEOUS PHASE
CARBON #2

DISCHARGE
POINT
PROJECT NO.: APP. BY:DRAWN BY:DATE:

FIGURE
PROCESS FLOW DIAGRAM –

DEWATERING EFFLUENT TREATMENT

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
6 01-KAF-009 05/2021 PGBEC

NOT TO SCALE
Initial Source: Clear Creek Systems, Inc. 2020. Process Flow Diagram- Sales Draft for Discussion. June 18.

BF/PF 50
CM 72 CM 72
VESSEL #1 VESSEL #2
PUMP
HAND
CHECK
VALVE
HAND
VALVE
HAND
VALVE
HAND
VALVE
HAND
VALVE
HAND
VALVE
SAMPLE
PORT
SAMPLE

PORT FLOW METER
GATE
VALVE
2000 GALLON

POLY TANK
SAMPLE
PORT
TO
POWER

SUBMERSIBLE
PUMP

PRESSURE
GAUGE

PRESSURE
GAUGE
RMD 74

ENVIRONMENTAL
SOLUTIONS —
TABLE
Table 1
Well Construction Details
Former Kaiser Aerotech Facilities
San Leandro, California

Page 1 of 3 ends

Well Top of Casing Casing Total Depth Soil Casing Screened Slot Filter Pack Well GW Installation Elevation Material of Boring Sampling Diameter Interval Size Interval Filter Pack Well Head Number Notes Zone Area Date (ft msl) (ft bgs) Frequency (inches) (ft bgs) (inches) (ft bgs) Material Northing Easting Completion MW-1 3,6 A Receiving Dock 10/30/96 11.50 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089071.2 6073935.8 Traffic Box MW-3 3,6 A MNA 10/29/96 9.20 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2088795.5 6073263.3 Traffic Box MW-4 A MNA 10/29/96 9.13 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089032.9 6073098.8 Traffic Box MW-5 3,6 A MNA 10/29/96 9.90 PVC 12 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089186.5 6073401.9 Traffic Box MW-6 A MNA 10/29/96 9.40 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089186.5 6073185.7 Traffic Box MW-8A 5,6 A MNA 3/6/97 13.97 PVC 11.5 Continuous 2 4-10 0.020 3.5-10 #3 Lonestar 2089389.9 6073505.2 Traffic Box MW-9 5,6 A MNA 10/28/96 13.02 PVC 10.5 Continuous 2 4-10 0.020 3.5-10 #3 Lonestar 2089616.9 6073339.3 Traffic Box MW-11 9 A DT No. 1 10/28/96 10.90 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089173.0 6073770.1 Traffic Box MW-13 A MNA 3/6/97 9.78 PVC 10 Continuous 1 5-10 0.020 4.5-10 #3 Lonestar 2089067.1 6073348.2 Traffic Box MW-16 6 A MNA 8/24/98 11.96 PVC 10 Continuous 2 3-10 0.020 2-10 #3 Lonestar 2089323.0 6073286.4 Traffic Box MW-17 A Breezeway Sump 8/20/98 9.41 PVC 10 Continuous 2 3.5-10 0.020 3-10 #3 Lonestar 2088904.8 6073140.5 Traffic Box MW-18 A Railroad/Western 8/20/98 8.18 PVC 10.5 Continuous 2 3.5-10 0.020 3-10 #3 Lonestar 2088973.5 6072906.5 Traffic Box MW-19 6 A DT No. 1 5/20/05 10.56 PVC 13 every 5 feet 2 5-13 0.010 4-13 #2/16 Sand 2089126.7 6073752.9 Traffic Box MW-20 9 A MNA 3/17/06 10.35 PVC 15 Continuous 2 5-15 0.010 3-15 #2/16 Sand 2089246.4 6073175.5 Traffic Box MW-21 9 A MNA 3/17/06 13.24 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2089356.2 6073347.1 Traffic Box MW-22 9 A A-zone Hotspot 3/17/06 12.35 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2089300.8 6073524.1 Traffic Box MW-23 9 A A-zone Hotspot 3/17/06 14.46 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2089523.2 6073446.9 Traffic Box MW-24 9 A MNA 3/15/06 11.76 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2089183.2 6073846.2 Traffic Box MW-25 9 A MNA 3/15/06 11.46 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2089031.2 6073835.0 Traffic Box MW-26 9 A A-zone Hotspot 3/15/06 10.35 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2088958.3 6073480.1 Traffic Box MW-28 11 A Railroad/Western 9/14/07 8.04 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2088999.8 6072863.0 Traffic Box MW-29 11 A DT No. 1 9/11/07 10.32 PVC 15 Continuous 2 5-15 0.010 4-15 #2/12 Sand 2089116.8 6073665.2 Traffic Box PZ-2 5,6 A A-zone Hotspot 6/23/03 11.59 PVC 12 Continuous 2 5-12 0.010 4.2-12 #2/12 Sand 2089282.1 6073307.5 Traffic Box FA-1 12 A Railroad/Western 7/11/08 8.07 PVC 15 Continuous 2 5-15 0.010 4-15 #2/16 Sand 2088971.8 6072826.6 Traffic Box LMW-1 15 UB Receiving Dock 8/21/98 11.19 PVC 28.5 Continuous 2 21-25 0.020 20-25 #3 Lonestar 2089067.6 6073936.1 Traffic Box LMW-2 UB Breezeway Sump 8/24/98 9.08 PVC 31 Continuous 2 21-31 0.020 19-31 #3 Lonestar 2088901.9 6073137.5 Traffic Box LMW-3 5,6 UB MNA 8/25/98 12.88 PVC 22.5 Continuous 2 17.5-22.5 0.020 15-22.5 #3 Lonestar 2089633.3 6073349.0 Traffic Box LMW-4 5,6 B Oil/Solvent Storage 8/24/98 12.13 PVC 28 Continuous 4 18-28 0.020 16-28 #3 Lonestar 2089316.7 6073693.4 Traffic Box LMW-5 3,6 B MNA 6/23/03 12.93 PVC 35 Continuous 2 20-30 0.010 19-30 #2/12 Sand 2089394.6 6073351.4 Traffic Box LMW-7 9 UB MNA 3/16/06 14.12 PVC 25 Continuous 2 15-25 0.010 13-25 #2/12 Sand 2089531.8 6073411.5 Traffic Box LMW-8 11 LB Oil/Solvent Storage 9/12/07 12.22 PVC 32 Continuous 2 25-30 0.010 24-30 #2/16 Sand 2089316.3 6073688.5 Traffic Box LMW-9 11 UB Railroad/Western 9/13/07 7.97 PVC 20 Continuous 2 15-20 0.010 14-20 #2/16 Sand 2089002.7 6072859.7 Traffic Box LMW-10 11 LB Breezeway Sump 9/12/07 10.08 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2088933.3 6073344.0 Traffic Box MW-27 10 A/UB Railroad/Western 8/1/06 8.14 PVC 20 Continuous 2 10-20 0.010 9-20 #2/16 Sand 2089013.1 6072871.9 Traffic Box PZ-1 B Oil/Solvent Storage 8/24/98 11.37 PVC 28 Continuous 1 18-28 0.020 16-28 #3 Lonestar 2089307.8 6073701.0 Traffic Box LPZ-2 3,6 UB DT No. 1 7/22/03 10.60 PVC 24 Continuous 2 14-24 0.010 13-24 #2/16 Sand 2089140.7 6073762.3 Traffic Box LPZ-3 3,6 B DT No. 1 7/23/03 10.65 PVC 32 Continuous 2 22-32 0.010 21-32 #2/16 Sand 2089149.6 6073763.4 Traffic Box LPZ-5 3,6 LB DT No. 1 7/25/03 10.57 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2089140.7 6073764.1 Traffic Box RW-5 3,6 B DT No. 4 7/23/03 9.97 PVC 32 Continuous 4 22-32 0.010 20.5-32 #2/16 Sand 2089107.0 6073575.8 Traffic Box RW-6 3,6 B DT No. 4 7/21/03 9.99 PVC 33 Continuous 4 23-33 0.010 22-33 #2/16 Sand 2089099.1 6073577.6 Traffic Box RW-7 3,6 B DT No. 4 7/21/03 10.11 PVC 34 Continuous 4 22-32 0.01 20.5-32 #2/16 Sand 2089096.2 6073563.0 Traffic Box RW-8 3,6, 15 B Breezeway Sump 7/25/03 10.25 PVC 30 Continuous 2 15-30 0.010 13.5-30 #2/16 Sand 2088931.0 6073317.4 Traffic Box RW-12 6 B Breezeway Sump 5/18/05 9.75 PVC 31.5 every 5 feet 2 15-30 0.010 14-30 #2/16 Sand 2088937.6 6073334.3 Traffic Box RW-13 6 UB Breezeway Sump 5/20/05 9.58 PVC 26.5 every 5 feet 4 16-26 0.010 15-26 #2/16 Sand 2088933.5 6073349.3 Traffic Box RMD ENVIRONMENTAL SOLUTIONS, INC.

Table 1
Well Construction Details
Former Kaiser Aerotech Facilities
San Leandro, California

Page 2 of 3 ends

Well Top of Casing Casing Total Depth Soil Casing Screened Slot Filter Pack Well GW Installation Elevation Material of Boring Sampling Diameter Interval Size Interval Filter Pack Well Head Number Notes Zone Area Date (ft msl) (ft bgs) Frequency (inches) (ft bgs) (inches) (ft bgs) Material Northing Easting Completion UB-2 9 UB DT No. 1 3/16/06 10.97 PVC 25 Continuous 2 15-25 0.010 13-25 #2/16 Sand 2089168.8 6073802.2 Traffic Box UB-3 11 UB DT No. 1 9/11/07 10.51 PVC 25 Continuous 2 15-25 0.010 13-25 #2/12 Sand 2089108.9 6073705.6 Traffic Box LB-3 11 LB DT No. 1 9/13/07 10.49 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2089103.9 6073706.3 Traffic Box UB-4 11 UB DT No. 1 9/13/07 10.18 PVC 25 Continuous 2 15-25 0.010 14-25 #2/16 Sand 2089012.8 6073599.7 Traffic Box LB-4 11 LB DT No. 1 9/13/07 10.14 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2089012.0 6073594.9 Traffic Box UB-5 11 UB Oil/Solvent Storage 9/12/07 12.29 PVC 30 Continuous 2 15-25 0.010 14-25 #2/16 Sand 2089311.2 6073662.9 Traffic Box LB-5 11 LB Oil/Solvent Storage 9/12/07 12.15 PVC 32 Continuous 2 25-30 0.010 24-30 #2/16 Sand 2089306.4 6073664.3 Traffic Box UB-6 11 UB Breezeway Sump 9/12/07 9.51 PVC 23 Continuous 2 14-23 0.010 13-23 #2/16 Sand 2088915.2 6073264.6 Traffic Box LB-6 11 LB Breezeway Sump 9/12/07 9.68 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2088914.8 6073262.0 Traffic Box FUB-1 12 UB Railroad/Western 7/11/08 8.13 PVC 20 Continuous 2 15-20 0.010 13-20 #2/16 Sand 2088974.8 6072822.7 Traffic Box F-2 13, 15 A/UB Railroad/Western 1/27/09 8.32 PVC 20 Continuous 2 10-20 0.010 9-20 #2/16 Sand 2088858.0 6072680.7 Traffic Box DW-1 6, 17 A/B DT No. 1 5/24/05 10.50 STEEL 35.5 Continuous 8 5.5-35.5 0.010 4-35.4 #2/16 Sand 2089126.8 6073759.4 Destroyed DW-2 6, 17 A/B DT No. 1 6/23/05 10.57 STEEL 35.5 Continuous 8 5.5-35.5 0.010 4-35.5 #2/16 Sand 2089134.0 6073757.1 Destroyed DW-3 6, 17 A/B DT No. 1 6/23/05 10.62 STEEL 35.5 Continuous 8 5.5-35.5 0.010 4-35.5 #2/16 Sand 2089128.8 6073750.0 Destroyed IW-1 1 A/B Oil/Solvent Storage 11/5/99 11.12 PVC 30 Not Sampled 2 5-30 0.020 4-30 #3 Lonestar NM NM Destroyed IW-2 2 B Oil/Solvent Storage 12/18/00 NM PVC 30 Not Sampled 2 17-28 0.020 15-28 #3 Lonestar NM NM Destroyed LB-1 9, 16 LB DT No. 1 3/14/06 11.05 PVC 35 Continuous 2 25-35 0.010 23-35 #2/16 Sand 2089168.4 6073786.3 Destroyed LB-2 9, 16 LB DT No. 1 3/14/06 11.16 PVC 35 Continuous 2 25-35 0.010 23-35 #2/16 Sand 2089171.5 6073799.6 Destroyed LMW-6 3, 6, 16 UB Breezeway Sump 6/24/03 9.70 PVC 25 Continuous 2 15-25 0.010 13.5-25 #2/12 Sand 2088932.3 6073338.0 Destroyed LPZ-4 3, 6, 16 UB DT No. 1 7/23/03 10.63 PVC 24 Continuous 2 14-24 0.010 13-24 #2/16 Sand 2089130.5 6073760.1 Destroyed MC-1A 7, 14 A Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 6.5-8 0.020 6.5-8 #3 Lonestar NM NM Destroyed MC-1B 7, 14 A Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 10.75-12.25 0.020 10.75-12.25 #3 Lonestar NM NM Destroyed MC-1C 7, 14 A Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 14.25-15.75 0.020 14.25-15.75 #3 Lonestar NM NM Destroyed MC-1D 7, 14 B Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 17.72-19.25 0.020 17.72-19.25 #3 Lonestar NM NM Destroyed MC-1E 7, 14 B Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 23.5-25 0.020 23.5-25 #3 Lonestar NM NM Destroyed MC-1F 7, 14 B Oil/Solvent Storage 11/5/99 NM PVC 30 Not Sampled <0.5 28.5-30 0.020 28.5-30 #3 Lonestar NM NM Destroyed MW-2 14 A MNA 10/30/96 10.61 PVC 12 Continuous 2 2.5-9.5 0.020 2-10 #3 Lonestar 2088878.7 6073713.1 Destroyed MW-7 17.00 A Oil/Solvent Storage 10/28/96 12.05 PVC 10 Continuous 2 4-10 0.020 3.5-10 #3 Lonestar 2089321.4 6073690.2 Destroyed MW-8 4, 5, 6, 14 A MNA 10/28/96 13.98 PVC 10.5 Continuous 2 4-10 0.020 3.5-10 #3 Lonestar 2089386.2 6073512.9 Destroyed MW-10 14 A MNA 10/28/96 7.87 PVC 10 Continuous 2 3-10 0.020 2.5-10 #3 Lonestar 2089094.4 6072759.3 Destroyed MW-12 5,6,17 A MNA 3/6/97 11.63 PVC 11.5 Continuous 2 4-10 0.020 3.5-10 #3 Lonestar 2089493.6 6073173.5 Destroyed MW-14 14 A MNA 3/6/97 10.57 PVC 11 Continuous 1 4-11 0.020 3.5-10 #3 Lonestar 2088871.8 6073740.4 Destroyed MW-15 17 A MNA 8/20/98 10.78 PVC 10 Continuous 2 2.5-10 0.020 3-10 #3 Lonestar 2088966.4 6073592.5 Destroyed RW-1 8, 16 UB DT No. 1 7/25/03 10.59 PVC 25 Continuous 2 14-24 0.010 13-24 #2/16 Sand 2089152.1 6073768.0 Destroyed RW-2 8, 16 LB DT No. 1 7/31/03 10.80 PVC 35 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2089156.2 6073767.3 Destroyed RW-3 3, 6, 16 UB DT No. 1 7/24/03 10.56 PVC 24 Continuous 2 14-24 0.010 13-24 #2/16 Sand 2089125.0 6073755.9 Destroyed RW-4 3, 6, 16 LB DT No. 1 7/24/03 10.56 PVC 38 Continuous 2 25-35 0.010 24-35 #2/16 Sand 2089128.8 6073750.0 Destroyed RW-9 3, 6, 16 B Breezeway Sump 7/31/03 9.58 PVC 30 Continuous 2 13.5-28.5 0.010 13-30 #2/16 Sand 2088932.5 6073306.9 Destroyed RW-10 6, 16 B DT No. 4 5/20/05 10.14 PVC 30 every 5 feet 4 20-30 0.010 19-30 #2/16 Sand 2089101.8 6073570.7 Destroyed RW-11 9, 16 B Breezeway Sump 5/18/05 9.45 PVC 31.5 every 5 feet 2 15-30 0.010 14-30 #2/16 Sand 2088949.0 6073334.4 Destroyed SAZ-1 17 C MNA 8/26/98 11.50 PVC 58 Not Sampled 2 45-55 0.020 44-55.5 #3 Lonestar 2089068.0 6073926.0 Destroyed SAZ-2 17 C MNA 8/27/98 9.45 PVC 59 Not Sampled 2 50.5-55.5 0.020 48.5-56 #3 Lonestar 2088907.7 6073135.8 Destroyed RMD ENVIRONMENTAL SOLUTIONS, INC.

Table 1
Well Construction Details
Former Kaiser Aerotech Facilities
San Leandro, California

Page 3 of 3 ends

Well Top of Casing Casing Total Depth Soil Casing Screened Slot Filter Pack Well GW Installation Elevation Material of Boring Sampling Diameter Interval Size Interval Filter Pack Well Head Number Notes Zone Area Date (ft msl) (ft bgs) Frequency (inches) (ft bgs) (inches) (ft bgs) Material Northing Easting Completion SAZ-3 5,6,17 C MNA 8/28/98 12.91 PVC 46 Not Sampled 2 39-44 0.020 37-44.5 #3 Lonestar 2089626.1 6073344.9 Destroyed TP-1 2 A/B Oil/Solvent Storage 3/10/00 NM PVC 28 Continuous 1 12.5-28 0.020 12-28 #3 Lonestar NM NM Destroyed UB-1 9, 16 UB DT No. 1 3/16/06 11.16 PVC 25 Continuous 2 15-25 0.010 13-25 #2/16 Sand 2089164.7 6073786.9 Destroyed Notes:
ft msl feet above mean sea level 1 Replaced by well IW-2 ft bgs feet below ground surface 2 Wells destroyed in June 2003 NM Not measured 3 Groundwater monitoring wells surveyed in September 2003 NR Not recorded 4 Groundwater monitoring well MW-8 was reported abandoned in March 1997. Relocated in October 2003.

UNK Unknown 5 Groundwater monitoring wells resurveyed in March 2004 PVC Poly vinyl chloride 6 Groundwater monitoring wells resurveyed in June 2005 A A-zone - approximately 5-15 feet below ground surface 7 MC-1 is multi-chambered well screened at six depths (A-F) UB Upper B-zone - approximately 15-25 feet below ground surface 8 Well casing modified and resurveyed in April 2006 LB Lower B-zone - approximately 25-35 feet below ground surface 9 Wells surveyed in April 2006 C C-zone - below approximately 35-40 feet below ground surface 10 Wells surveyed in February 2007 DT No. 1 Degreasing tank no. 1 11 Wells surveyed in September 2007 DT No. 4 Degreasing tank no. 4 12 Wells surveyed in July 2008 MNA Monitored natural attenuation 13 Well surveyed in February 2009 14 Wells destroyed in May 2009
15 Wells surveyed in September 2009
16 Wells destroyed July 2015
17 Wells destroyed October 2020
RMD ENVIRONMENTAL SOLUTIONS, INC.

APPENDIX A

LAND-USE COVENANT
RECORDING REQUESTED BY:

Redemco, LLC.
395 Mill Creek Circle
Vail, CO 81657
Attention: Ann Becher-Smead
WHEN RECORDED, MAIL TO:

Department of Toxic Substances Control
700 Heinz Avenue
Berkeley, California 94710
Attention: Karen Toth, Unit Chief

0.00 20 PGS
2012293798 09/07/2012 01:44 PH

OFFICIAL RECORDS OF ALAMEDA COUNTY
PATRICK O’CONNELL
RECORDING FEE:

SPACE ABOVE THIS LINE RESERVED FOR RECORDER’S USE

COVENANT TO RESTRICT USE OF PROPERTY

ENVIRONMENTAL RESTRICTION
County of Alameda APNs 77A-741-4-2 and 77A-741-5, Former Kaiser Aerotech Site, DTSC site code number 200559
This Covenant and Agreement ("Covenant") is made by and between Redemco, L.L.C, (the "Covenantor"), the current owner of property situated in San Leandro, County of Alameda, State of California, described in Exhibit "A" and depicted in Exhibit “B,” attached, (the "Property"), and the Department of Toxic Substances Control (the "Department"). Pursuant to Civil Code section 1471, the Department has determined that this Covenant is reasonably necessary to protect present or future human health or safety or the environment as a result of the presence on the land of hazardous materials as defined in Health and Safety Code section 25260. The Covenantor and Department, collectively referred to as the "Parties," hereby agree, pursuant to Civil Code section 1471, and Health and Safety Code section 25355.5 that the use of the Property be restricted as set forth in this Covenant; and the Parties further agree that the Covenant shall conform with the requirements of California Code of Regulations, title 22, section 67391.1.

ARTICLE I

STATEMENT OF FACTS

1.01. The Property, totaling approximately 14 acres, is more particularly described as 880 Doolittle Drive and 498 Hester Street in the City of San Leandro, County of Alameda, California, and is depicted in the attached Exhibits "A" and “B”. The Property is located in the area now generally bounded by Doolittle Drive on the west, Hester Street on the north and Davis Street on the south. The Property is also described as Alameda County Assessor's Parcel Numbers 77A-741-4-2 and 77A-741-5.

1.02. A limited portion of the Property is more particularly described in Exhibit "C," and referred to as the Ground Water Monitoring System. The Ground Water Monitoring System consists of groundwater monitoring wells located throughout the entire Property.

1.03. Covenantor is remediating the Property under the supervision and authority of the Department. The Property is being remediated pursuant to a Remedial Action Plan developed in accordance with Health and Safety Code, division 20, chapter

6.8 under the oversight of the Department. The Remedial Action Plan (RAP) and notice of exemption, pursuant to the California Environmental Quality Act, Public Resources Code section 21000 et seq. were released for public review and comment and subsequently approved by the Department on February 26, 2008. A Covenant is required as part of the site remediation, because volatile organic compounds (VOCs), which are hazardous substances, as defined in Health and Safety Code section 25316, and hazardous materials as defined in Health and Safety Code section 25260, remain above unrestricted cleanup goals in groundwater and shallow soil below the surface of the property.

Remediation includes maintaining groundwater monitoring wells ("Monitoring Wells").

Page 2 ends

The locations of the Monitoring Wells are shown on Exhibit C. The operation and maintenance of the Monitoring Wells is being conducted pursuant to an Operation and Maintenance Plan approved by the Department on June 27, 2012.

1.04. Soil investigations identified contaminants at concentrations exceeding residential screening levels in limited areas of the Property. As detailed in the RAP, a limited portion of the subsurface soils within six feet of the surface of the Property, as more particularly described in Exhibit D, contain a hazardous substance (trichloroethene; TCE), as defined in Health and Safety Code section 25316. The maximum TCE concentration detected in soil within six feet of the surface was 1,100 pg/kg. This exceeds the Environmental Protection Agency Regional Screening Level for TCE in soil for residential use (910 pg/kg ).

As detailed in the RAP, groundwater at the Property is found 5 to 7 feet below ground surface (bgs) and extends beyond 40 feet bgs. As of June, 2012, contaminants in the groundwater above their associated California Maximum Contaminant Levels (drinking water standards) are: TCE; cis-1,2-DCE; trans 1,2-DCE; 1,1-DCE; 1,1-DCA; 1,2-DCA; and vinyl chloride (VC).

The Department concluded that use of the Property as a residence, hospital, school for persons under the age of 21 or day care center would entail an unacceptable human health risk and exposure to and use of the groundwater presents an unacceptable threat to human health and safety. The Department further concluded that the Property, as remediated, and subject to the restrictions of this Covenant, does not present an unacceptable threat to human health or safety or the environment, if limited to commercial and industrial use and limited by the other Environmental Restrictions herein.

Page 3 ends

ARTICLE II

DEFINITIONS

2.01. Department. "Department" means the California Department of Toxic Substances Control and includes its successor agencies, if any.

2.02. Environmental Restrictions. “Environmental Restrictions” means all protective provisions, covenants, restrictions, prohibitions, and terms and conditions as set forth in any section of this Covenant.

2.03. Improvements. “Improvements” includes, but is not limited to: buildings, structures, roads, driveways, improved parking areas, wells, pipelines, or other utilities.

2.04. Lease. “Lease” means lease, rental agreement, or any other document that creates a right to use or occupy any portion of the Property.

2.05. Occupant. "Occupant" means Owners and any person or entity entitled by ownership, leasehold, or other legal relationship to the right to occupy any portion of the Property.

2.06. Owner. "Owner" means the Covenantor, and all successors in interest including heirs and assigns, who at any time hold title to all or any portion of the Property.

ARTICLE III

GENERAL PROVISIONS

3.01. Runs with the Land. This Covenant sets forth Environmental Restrictions that apply to and encumber the Property and every portion thereof no matter how it is improved, held, used, occupied, leased, sold, hypothecated, encumbered, or conveyed.

This Covenant: (a) runs with the land pursuant to Health and Safety Code section

Page 4 ends

25355.5 and Civil Code section 1471; (b) inures to the benefit of and passes with each and every portion of the Property, (c) is for the benefit of, and is enforceable by the Department, and (d) is imposed upon the entire Property unless expressly stated as applicable only to a specific portion thereof.

3.02. Binding upon Owners/Occupants. Pursuant to the Health and Safety Code, this Covenant binds all owners of the Property, their heirs, successors, and assignees, and the agents, employees, and lessees of the owners, heirs, successors, and assignees. Pursuant to Civil Code section 1471, all successive owners of the Property are expressly bound hereby for the benefit of the Department.

3.03. Incorporation into Deeds and Leases. This Covenant shall be incorporated by reference in each and every deed and Lease for any portion of the Property.

3.04. Conveyance of Property. The Owner shall provide written notice to the Department not later than thirty (30) days after any conveyance of any ownership interest in the Property (excluding Leases, and mortgages, liens, and other non-possessory encumbrances). The written notice shall include the name and mailing address of the new owner of the Property and shall reference the site name and site code as listed on page one of this Covenant. The notice shall also include the Assessor’s Parcel Number (APN) noted on page one. If the new owner’s property has been assigned a different APN, each such APN that covers the Property must be provided. The Department shall not, by reason of this Covenant, have authority to approve, disapprove, or otherwise affect proposed conveyance, except as otherwise provided by law or by administrative order.

3.05. Costs of Administering the Covenant to be paid by Owner. The Department has already incurred and will in the future incur costs associated with the administration of this Covenant. Therefore, the Covenantor hereby covenants for the Covenantor and for all subsequent Owners that, pursuant to California Code of

Page 5 ends

Regulations, title 22, section 67391.1(h), the Owner agrees to pay the Department’s reasonable administrative oversight costs in administering the Covenant.

ARTICLE IV

RESTRICTIONS AND REQUIREMENTS

4.01. Prohibited Uses. The Property shall not be used for any of the following purposes without advance written approval from the Department under Sections 6.01 and 6.02:
(a) A residence, including any mobile home or factory built housing, constructed or installed for use as residential human habitation. (b) A hospital for humans.
(c) A public or private school for persons under 21 years of age. (d) A day care center for children.

4.02. Soil Management.
(a) No activities that will disturb the soil at or below 2.5 feet below grade (e.g., excavation, grading, removal, trenching, filling, earth movement, mining, or drilling) shall be allowed in areas with identified exceedances of residential screening levels, as depicted by the shaded areas in Exhibit D on the Property without a Soil Management Plan approved by the Department in advance.
(b) Any contaminated soils, in areas with identified exceedances of residential screening levels as depicted by the shaded areas in Exhibit D, brought to the surface by grading,
excavation, trenching or backfilling shall be managed in accordance with an approved Soil Management Plan and all other applicable provisions of state and federal law.

Page 6 ends

4.03. Prohibited Activities. The following activities shall not be conducted at the Property:
(a) Drilling for any water, oil, or gas without prior written approval by the Department.
(b) Extraction of groundwater except as approved by the Department.

4.04. Non-Interference with groundwater monitoring wells. (a) The groundwater monitoring wells shall not be altered without prior written approval by the Department.
(b) All uses and development of the Property shall preserve the physical accessibility to and integrity of the groundwater monitoring wells unless otherwise approved in writing by the Department.

4.05. Access for Department. The Department shall have reasonable right of entry and access to the Property for inspection, monitoring, and other activities consistent with the purposes of this Covenant as deemed necessary by the Department in order to protect the public health or safety, or the environment

4.06. Access for Implementing Operation and Maintenance. The entity or person responsible for implementing the Operation and Maintenance Plan shall have reasonable right of entry and access to the Property for the purpose of implementing the Operation and Maintenance Plan until the Department determines that no further Operation and Maintenance is required.

4.07. Inspection and Reporting Reguirements. The Owner shall conduct an annual inspection of the Property verifying compliance with this Covenant, and shall submit an annual inspection report to the Department for its approval by January 31st of each year. The annual inspection report must include the dates, times, and names of those who conducted the inspection and reviewed the annual inspection report. It also shall describe how the observations were performed that were the basis for the

Page 7 ends

statements and conclusions in the annual inspection report (e.g., drive by, fly over, walk in, etc.). If violations are noted, the annual inspection report must detail the steps taken to return to compliance. If the Owner identifies any violations of this Covenant during the annual inspections or at any other time, the Owner must within 10 days of identifying the violation: determine the identity of the party in violation, send a letter advising the party of the violation of the Covenant, and demand that the violation ceases immediately. Additionally, copies of any correspondence related to the violation of this Covenant shall be sent to the Department within 10 days of its original transmission.

ARTICLE V

ENFORCEMENT

5.01. Enforcement. Failure of the Owner or Occupant to comply with this Covenant shall be grounds for the Department to require modification or removal of any Improvements constructed or placed upon any portion of the Property in violation of this Covenant. Violation of this Covenant, including but not limited to, failure to submit, or the submission of any false statement, record or report to the Department, shall be grounds for the Department to pursue administrative, civil, or criminal actions, as provided by law.

ARTICLE VI
VARIANCE. TERMINATION, AND TERM

6.01. Variance from Restriction. Any person may apply to the Department for a written variance from a restriction imposed by this Covenant. Such application shall be made in accordance with Health and Safety Code section 25223.

6.02 Removal of Restriction. Any person may apply to the Department to remove a restriction imposed by this Covenant. Such application shall be made in accordance with Health and Safety Code section 25224.

Page 8 ends

6.03 Term. Unless ended in accordance with paragraph 6.02, by law, or by the Department in the exercise of its discretion, this Covenant shall continue in effect in perpetuity.

ARTICLE VII

MISCELLANEOUS

7.01. No Dedication Intended. Nothing set forth in this Covenant shall be construed to be a gift or dedication, or offer of a gift or dedication, of the Property, or any portion thereof to the general public or anyone else for any purpose whatsoever.

7.02. Recordation. The Covenantor shall record this Covenant, with all referenced Exhibits, in the County of Alameda within thirty (30) days of the Covenantor's receipt of a fully executed original.

7.03. Notices. Whenever any person gives or serves any Notice ("Notice" as used herein includes any demand or other communication with respect to this Covenant), each such Notice shall be in writing and shall be deemed effective: (1) when delivered, if personally delivered to the person being served or to an officer of a corporate party being served, or (2) three (3) business days after deposit in the mail, if mailed by United States mail, postage paid, certified, return receipt requested:

To Owner: Redemco LLC
395 Mill Creek Circle
Vail, Colorado 81657
Attention: Ann Becher-Smead
and
To Department: Department of Toxic Substances Control
700 Heinz Avenue
Berkeley, California 94710
Attention: Nina Bacey, Project Manager
Any party may change its address or the individual to whose attention a Notice is to be

Page 9 ends

sent by giving written Notice in compliance with this paragraph.

7.04. Partial Invalidity. If this Covenant or any of its terms are determined by a court of competent jurisdiction to be invalid for any reason, the surviving portions of this Covenant shall remain in full force and effect as if such portion found invalid had not been included herein.

7.05. Statutory References. All statutory references include successor provisions.

7.06. Incorporation of Attachments. All attachments and exhibits to this Covenant are incorporated herein by reference.

IN WITNESS WHEREOF, the Parties execute this Covenant.

Covenantor: Redemco, L.L.C.

By:

Title: Ann Becher Smead
Vice President, Redemco, L.L.C.
s'?
Date:

Department of Toxic Substances Control:

Title: Karen M. Toth, Unit Chief
Date: g/ A.

Page 10 ends

/o£-/*-£>6
State of Oattfem+a
County of,
On ^Zy before me, Ch! LL
(Name of Notary Public and Title)
personally appeared g/Z' ^£> , who
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal,
_ (seal)
Signature of Notary Public
FRANK R. McNEILL

NOTARY PUBLIC
STATE OF COLORADO ;
My Commission Expires 03/24/2018

Page 11 ends

State of California
County of. ACA^M
On y| I 1 before me,
(Name of Notary Public and Title)
personally appeared , who
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal,
(seal)

PISCHHLI

Page 12 ends

EXHIBIT »A»
Description.

REAL PROPERTY in the City of San Leandro, County ‘
of Alameda, State of California, .described asfollows:

PARCEL 1:

A PORTION of that certain 28. 866 acre tract of land
described in the deed from C. R. Adams, et ux, to McGuire and Hester, a California corporation, dated December 22, 1954, recorded December 24, 1954 in book 7619 of Official Records of Alameda County, page 420, (AJ/117215) described aS follows:

BEGIN at the eastern extremityof that certain curve
having a radius of 20 feet, which connects the southeastern,line ' of Adams Avenue, withthe southwestern line of Hester Street; as said curve, avenue and street are shown on the.map of “Tract 1606", filed October 11, 1955 in book 36 of Maps, page 63, in the office of the County Recorder of Alameda County; run then along said line of Hester Street and its direct production, southeasterly, as described in Parcel 1 of deed by McGuire and Hester, a corporation; to City of San Leandro, a municipal corporation, dated July 2, 1956, recorded July 5, 1956 in book 8080 of Official Records of Alameda County, page 11, (AL/70905), south 60° 14* 20“ east 1356 feet; then continue along said line of Hester Street, southeasterly on the arc of a curve to the right, with a radius of 20 feet,- tangent to the last mentioned course,

17.91 feet and southerly and southeasterly on the arc of a reverse curve to the left, with a radius of 60 feet, tangent to the last mentioned arc, 64. 68 feet to the actual point of commencement;. then continue on the arc of said curve to the left, having a radius of 60 feet, easterly, northeasterly and westerly, tangent to the last mentioned arc, a distance of 204. 23 feet to a point on the exterior boundary line of the parcel of land described in the. deed from McGuire and Hester, a California corporation, to Tara Development Company, a corporation/ dated April 6, 1959, . recorded April 13, 195® in book 8992 of Official Records of Alameda County, p^ 317, (AQ/42551), said point being the western extremity m jhat certain course having a radius of 20 feet and an arc dampen of 22. 52 feet; then along the exterior boundary line of said last mentioned parcel of land, the two following courses and distances: easterly and northeasterly along the arc of said curve having a radius of 20 feet to the left from a tangent which bears south 85“ 43’ 26° east, a distance of 22. 52 feet; and then north 29° 45’ 40” east, tangent to said last mentioned arc, 230. 05 feet to a point on the northeastern line of said 28. 866 acre tract of land; then along the exterior boundary line of said 28. 866 acre tract of land, the five following courses and distances: south 60° 14* 20" east 572. 8.7 feet to an angle point thereon, north 78° east 116. 65 feet, then south 13° 07’ 08” east 80 feet, south 78“ west 421. 78 feet and south 77° 33’ west 344.14 feet until intersected by a Tine drawn south 12° 27 * east from the actual point of commencement; and then along said line, so drawn, north 12° 27* west 177.96 feet to the actual point of commencement.

FARCED 2:
'

A NON-EXCLUSIVE PERPETUAL EASEMENT AND
RIGHT OF WAY for railway spur tracks and all reasonable uses • connected therewith, including maintenance and operation of freight cars together with the right to grant said easement to the Southern Pacific Company, a corporation, and also a non-exclusive easement and .right of way for drainage purposes, together with the right to grant said drainage easement to the City of San Leandro, a municipal corporation, appurtenant to and for the use of the owner or owners of Parcel 1 above described, and any subsequent subdivision or subdivisions thereof, described as follows:

A PORTION of that certain 28. 866 acre tract of land
described in the deed from C. R. Adams, et ux, to McGuire and Hester,. a California corporation, dated December 22, 1954, recorded December 24, 1954 in book 7519 of Official Records of Alameda County, page 420, described asfollows:

BEGIN at the southeastern corner of the parcel of
land designated as Parcel 1 in. the deed from Joseph P. Hester, a widower, to Utility Trailer Sales Company of San Francisco, .

Inc. , a corporation, dated February 10, 1961, recorded February 14, 1955 on Reel 264, Image 854, (AS/18824) Alameda County Records; run then along the eastern boundary line thereof, north 12“ 27’ west 20 feet; then south 77° 38’ west 348.68 feet; then westerly along the arc of curve to the right, with a radius of. 291- 90 feet, tangent to jthq last mentioned course, 118. 37 feet to a point on the northwests^ boundary line of said Parcel 1(AS/18624); then along said last mentioned line, south 29° 45' 40” west 7. 26 feet to a point on the-southwestern boundary Hue of said 28. 866 acre -2 -
“
tract of land; then along the last mentioned line, south 55’ 31’ east

52.42 feet to a point on the southern boundary line of said 28. 866 acre tract of land; and then along the last mentioned line, north 77" 33''e8sH32.92 feet to the point of beginning.

BEGINNING at the northeastern cornea? of the
parcel of land conveyed by Gertrude A* McNamara,
et al, to Robert L, Osborne by deed dated August
27, 1945, recorded September 12, 1945, in book 4773 of Official Records of Alameda County, page 3o5, and running thence along the northern line
of said parcel of land south 78° -west, 421.78 feet to an angle point therein; thence continuing along said northern line south 77* 33» west 777.06 feet to the northeastern line of the right of -way, 60 feet wide of the Southern Pacific Company; thence along the last named line south 55° 31’ east, 428.91 feet; thence north 77* 33’ east, 82.13 feet; thence south 55* 31’ east, I90.2O feet; thence north 77” 33’ east, 698.582 feet to the eastern line of said parcel of land;} and thence along th® last
named line north 13* 02’ west, 449.01 feet to the
point of beginning, containing 10 acres, more or
less;
Parcel.4:
a non-exciusive, irrevocable easement for
roadway and incidental purposes (including the installation, maintenance and removal of water.lines) in favor of Kaiser Aerospace &Electronics Corporation,* its tenants, servants, visitors and licensees, assignees and successors in Interest, for all purposes connected with the use of the above described premises, and as appurtenant to the above described premises, -over and upon the following described properties situate in the tTownship of Eden, County Of Alameda, California, more . particularly described-as follows, towwit;
PORtlON of the tract, of land conveyed by
Gertrude.A. McNamara, et al, to Robert L.

Osborne by'deed dated August 27, 1945, recorded
September 12, 1945^ in book 4773 Of'Official
Records of Alameda County, California, page 365,
described as follows;
Parcel A»
BEGINNING at a point on the northeastern
line of Bay.Shore Boulevard, or County Road No.
1434, distant thereon north 45° 04’ west 1247.30
feet from the northwestern line of Davis Street, .
or county Road No.1434; and running thence along
O.
1 said line of Bay Shore Boulevard north 45® 041
west 4o feet to the northern line of said tract
of land described in said deed; thence‘along the
last named...line north 44° 56' east 218,25 feet
to the southwestern line of the right-of-way, 60
feet wide, of the Southern Pacific Company;
thence along the last named line south 55° 31’
east 40.67 feet to a line drawn north 44“ 56’ east
from the point of beginning; and thence south
56’ west 225.63 feet to the point of beginning.

CONTAINING O.2Q3 of an acre, more or less.
parcel B.

BEGINNING at a point on the northeastern line
of the right-of-way 60 feet wide of. southern Paci¬
fic Company which is south 55® 31’ east 428.91 feet from’the intersection of.the north line of the parcel of land conveyed by Gertrude A.

McNamara et al, to Robert L, Osborne by deed
dated August 27, 1945, recorded September 12,
1945, in Book 4773 of Official Records, Alameda
County, at page 365, with the northeastern line
of said right-of-way 60 feet wide of the Southern
pacific Company; running thence from said point
of beginning north 77® 33* east 82.13 feet; running ,
thence in a southwesterly direction to a point on
the northeastern line of the said right-of-way 60
feet Wide of the Southern Pacific Company, which
point bears north 44“ 561 east from a point on the
northeastern line of Bay Shore Boulevard or county
Road No. 1434, distant thereon north 45“ o4‘ west 1,247.3d feet from the northwestern line of Davis Street or County Road No. 1434; running thence
north 55° 31' west along the northeastern line
of the said right-of-way 60 feet wide of the
Southern Pacific company to the point of beginning.

TOGETHER with a non-exclusive perpetual easement (subject to abandonment by Kaiser Aerospace & Electronics Corpora¬ tion, or its assigns at ;ts or their option) appurtenant to parcel iover and upon the following described property situate in the Township of Eden, County of Alameda,’Californla, which easement is described as follows:

AN EASEMENT lying seven and one-half feet each
side of the following described center-line:

COMMENCING at a point on the northeastern line
of Doolittle'Drive (formerly’known as County
Road No* 1434 or Andrews landing Road) distant
thereon north 45“ 04’ west 1287.30 feet from the
intersection thereof With the northwestern line
of Davis Street as said street now exists; thence
north 44“ 56’ east 279,26 feet to the northeastern
line of the right-of-way of the Southern Pacific
Company, 60 feet wide; thence north 77° 33’ east

21.97 feet to the actual point of beginning for
this description^ running thence parallel to said
G .
2 northeastern line of the right-of-way of the
Southern Pacific Company south‘55° 31’ east
1090.99 feet to an angle point; thence south 4?° 15* 15” east 176.90 feet to the- said, north¬ western line of the Southern Pacific right-of-way;
for the construction, installation and maintenance of a 10” sewer line for the Joint use of Kaiser Aerospace & Electronics Corporation and th© owners, users and occupants of the said premises over which said easement traverses’; provided, how¬ ever,that Kaiser Aerospace &Electronics Corporation shall at all times be entitled to th© priority use of the capacity of said sewer line comparable to the capacity of an 8” sewer line; the cost and maintenance of said sewer line to be born© jointly in the same proportion by Kaiser Aerospace & Electronics'
Corporation, and the owners, users or occupants
of the said premises over which said easement traverses. parcel 5j The following easement (i) the easements described in a Deed dated January 18, 1954, executed by Robert 1».

Osborne and Katherine A. Osborne, recorded January 27, 1954, in Book 7236 of official Records of. Alameda county,
California, page 165, at seg., and (11) in that certain easement dated August’16, 1951, executed by Robert L.

Osborne and Katherine A. osborne, recorded September 14, 1951, in Book 6535 of Official Records cf Alameda County, California, page 277, which last mentioned easement was made perpetual and appurtenant to Parcel 3 by said Deed dated January 18, 1954; which easements were transferred from Wilco Properties, Inc. to Kaiser Industries Corporation by a Grant Deed dated October .31, 1957, recorded November 6, 1957, in Book 8514, page 511, et seq., of Official Records of Alameda county, California.

APPENDIX B

AGREEMENT AND ACKNOWLEDGEMENT STATEMENT

APPENDIX A

SOIL AND GROUNDWATER MANAGEMENT PLAN

AGREEMENT AND ACKNOWLEDGMENT STATEMENT
Leandro Brookshire LLC
880 Doolittle Drive and 498 Hester Street
San Leandro, California
All project personnel and subcontractors are required to sign the following agreement prior to conducting work at the site.

1. I have read and fully understand the Soil and Groundwater Management Plan and my individual responsibilities.

2. I agree to abide by the provisions of the Soil and Groundwater Management Plan.

Name Company Date Signature
(Add additional sheets if necessary)

APPENDIX C

HISTORICAL SOIL, GROUNDWATER, SUBSLAB VAPOR, INDOOR AIR,

AND SOIL VAPOR DATA
APPENDIX C1

PRE-REMEDIATION TCE DISTRIBUTION
SGI
environmental
Shallow Soil (<6 Feet Depth) TCE
Isoconcentration Contours

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
Sd ™E
environmental Source Group, Inc.
3451-C VINCENT ROAD
PLEASANT HILL, CA 94523
Date:
3/21/08
Figure:
3 shallow soil TCE6’.dwg
LEGEND
100 Sample location
A-zone well CB-10
MH-15
B-zone well 1000
TCE concentration (ug/L or ug/kg)
Approximate TCE isoconcentration contour (ug/L) FS-C6
10-100 ug/L FS-C5
100 - 1,000 ug/L LMW-7
1,000- 10,000 ug/L
10,000 ug/L FS-C3
FS-C10 100,000 ug/L
Trichloroethene 100 MW-2(H) Former Kaiser Aerotech Facilities boundary .MW-5 CB-42 FS-B4 EB-6
CB-48
MW-1i '.B-19 ug/L Micrograms per liter (water) CB-41 E-6(G) FS-C12 ,CB-49
GP-49, 0.40 1000 FS-B5 CB-1 -5(G) ®SW-3 (<5.0)
FS-A9 100 :b-24
GP-59 E-3(G)
MW- GP-57A CB-21
GP-89 FS-D1 EB-14
MW-4 oocR
ju«-O^G E-2(G) 100 69,000 1W-25
TP-6AIB CPT-30 rS-A2
MW-15 FS-D2
TP-7AIB
1000
SW-1
LMW-6
B-7(G) B-3(G)
•TP-3A/B
120
Scale (feet)
FS-D7

OAKLAND
METROPOLITAN B-4(G)

GOLF LINKS
TP-2B
GP-61
f2oo;
CB-6
(<30)
FS-D6 (<5%)
FS-D3
X<50)
GP-32
(<15)
LMW-1
(<5.0)
MW-18
‘13,000
FS-C2
2,200*
FS-B6
(<50)
LB-4
(130) ,
EB-7
4<5-0)
CB-40
220
FS-C21
(<22)
GP-61
960
CB-9
520
CPT-21
<0.50
GP-81
3,800
GP-82 _ (5.3)
FS-C11
<25
-S-C13 4,50^
SW-2
<8.3

LIMIT OF FENCELINE

EXCAVATION
<5.0
EB-15
(<50)
B-6(G)
<5 O
B-1(G)
<5 O
B-2(G)
<5 O
EB-18
(9.3)
:S-A5
(<50)
One-time groundwater sample result not
used in contouring based on adjacent
monitoring well results.

Approximate sand lens boundary between
5 and 10 feet below ground surface
(ETIC, December 27, 2002)
GP-38 (6.3) / MW-9
MW-8A
100
GP-48
<0.5
1OOO(<5.o;
SW-7
<0.5
/MW-3(H)/
r 1,870 -T
^CB-3^
300
ug/kg Micrograms per kilogram (soil)
Soil Concentrations Parenthesized
CB-30 FS-A3
:B-25 1
2,600* 1
MW-24
FS-C16
(<5.0)
RW-12
(1,100K
RW-9 (12^J
fFS^ O ^5.0)
GP-87^ (13,000)^
<LMW-9j/ \(8,100) \
FS-C9 ' (<5.0p
/ EB-4 C ’§rt^5.0) gg_20
1000-
GP-7-
970
CPT-33
TP-4A/B
<0.5
MW-28 ^■9) 170,000/
Z/CB-8 7 1,000
^CB-T2^MH-16
GP6^UHG
VCPT-32
LX ^}-D4 100<
<7TP-5A/B ^^280 V— GP-8?%y ^i,ooo^C^\
CB-39
CB-37 170
^B-31 E^)^ 340 (250) 3.40
\ MW-11
E:B-38 *<>1000
RW-10
1D0000I
. 1W00 \ 1000'
EB-16 1000
GP-42
^0)/^ GP-40 | (180) -4^A GP-44 '2) (220)
MW'2 MW-14
- ^cb-s; '27 ' /SOLVIT \
EB-2
2,400*
:B-27
EB-5
W 73%CB-1-
5=^77^ /1000 r0*- 1
EB-12 r (32)o \
FS-C14
(<5-0)
O MWS259 V-KG) \ —-GP-80 * \ (26) \GP-78\ \l2,000
A-Zone TCE Isoconcentration Contours
November 2007

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
SGI THE Source Group, Inc. Date:2/8/08 Figure: environmental 4 3451-C VINCENT ROAD
PLEASANT HILL, CA 94523 A-zone TCE.dwg
LEGEND
LMWSample location
GP-38 100 B-zone well
Multichambered well (A + B)
TCE concentration (ug/L or ug/kg)
LMW100- 1,000 ug/L
1,000- 10,000 ug/L
FS-C21 10,000- 100,000 ug/L
100,000 ug/L
(<5.0) Total B-zone Coarse-Grained Greater than 1 foot
IW-4 000
TCE GP-48 'GP-50
ug/kg
Soil Concentrations Parenthesized -49 5 .FS-A6
CPTRWrl
GP-700^
EB-12.

EB-9
dock
69;000
TP-4A/B 0\jd^g CPT-
-6AIB
CPT-39
GP-82
:S-D2 :S-D8
CPT-3' GP-80
10000 SB-1 ^00
CPT-1
O (18)
120 GP-44
Scale B-6(G) (feet)
OAKLAND SB-4
DLT2
B-5(G)
TP-2B
LMW-1
6,000
(<5.0)
EB-18
(<5.0) ,
GP-51
(<5.0) FS-C2
(<5-0)
FS-C3
(640)
FS-B2
0(21)
2,700
CB-1
(<5P).

Micrograms per liter (water)
Micrograms per kilogram (soil)
FS-D3 K<5.0)
FS-B6
2,800 -
FS-C20
O (<5°)
LB-1
11,000
> GP-52
O (180)
FS-C9 ' (<5.0)0
UB-2
\G,7,200
[ FS-A5 3,100
CPT-23
‘O <0.50
CPT-20
<0.50
CPT-22
O<0.50

LIMIT OF FENCELINE

EXCAVATION
One-time groundwater sample result not
used in contouring based on adjacent
monitoring well results.

CPT-21
<0.50
* S\No <>

METROPOLITAN

GOLF LINKS
Former Kaiser Aerotech Facilities Boundary
Trichloroethene
'1000
TP-7AJB CPT-2 1
.'<0.5.0
&CPT-38\
EB-8 »
:: .c<5.p)/ i
y1 GP-83 560
GP-79 /GP-84
GP-8t
3,400
RW-11
GP-67 \. 7,war
100000
<
GP-85/
\ 120,000
LMWCPT-7^28
71,900
GP-77 46,000
GP.53
•O(<5:q/
CPT-30
,65p;;
40,000'
7^EB^GP-75\h (3,600) 310 ya S-A4 /
Approximate TCE Isoconcentration contour (ug/L)
10-100 ug/L
EB-5 . . . . LMw-
. . . .26JJfO
^65^^GPT-32
GP-69 \l^MW-6 1,600. Y.800
930
RW-7—
5,000 <
10000>
ub-4 lOOOOOx.
320,000- 1000CT
EB-15
FS-C15 (<5.0)
, <100
7 LMW-y
t 210,000
\ GP-kr
\ 66,000 2
RW-9 N
3 2M RVV-8
\ DLT3 100vl0^^°
All
\.7.y^',200
/ MW-27 / 720,000 GP-90
"GP-89
FS-B5 R„ EB-1 ^nn 43’000 r O 5,600 /c
GP-61A
FS-A9A 5^00^^z .
<3P-66
-CPT-33-
600 rp_GP-76
—

1. ........EB-6 '
EB-1 UB-^ 6 8,60^^^ ,n<5:o) „
:::::::fs,c4.
^>*<RW-13
" 8,900
"LMW-10
< 57,000
FS-D5
B-Zone TCE Isoconcentration Contours
November 2007

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA

SGI THE
environmental Source Group, Inc.
3451-C VINCENT ROAD
PLEASANT HILL, CA 94523
Date:
2/6/08
Figure:
5 TCE B-zone.dwg
Site Plan with Schematic Geologic
Cross-Section Locations

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
Date:
1/16/08
Figure:
6 SGI THE environmental Source Group, Inc.
3451-C VINCENT ROAD
PLEASANT HILL CA 94523 Figure 6-site plan with sampling locations.dwg LEGEND: (West) (East)
Fine-grained soil (silts and clays)
CPT-30 Coarse-grained soil (sands and gravels) UB-3/LB-3 10-| Fill (190) 290 TCE concentration in water (ug/L)
(110) TCE concentration in soil (ug/kg) (500) (45)
<100 ug/L
(380)
0- F 10 100-1,000 ug/L (130) _^100 (810) 2,100 1,000-10,000 ug/L tooo 10,000-100,000 ug/L (4o:
>100,000 ug/L
6,800 —100 — Approximate TCE isoconcentration contour (ug/L) -10- -20
26,000 2,700 Not used in contouring
(2,800)
o TCE Trichloroethene
TD=25 Feet
(<5.0) 11,00. 3,100
19,000’ 150,000 -20- -30 (13,000) 10 feet —
TD=32 Feet
Approximate grab groundwater sample or well screen interval. TD=35 Feet TD=35 Feet TD=38 Feet
-30 J L40
TD=40 Feet TD=40 Feet
50 feet
DW3 MW-19 RW-3 DW1 RW-4 LPZ-5 LPZ-2 LPZ-3 GP-60 UB-1/LB-1 UB-2/LB-2 FS-A5 (61)
FS-D8, GP-60, GP-63
(150) - 10 A-Zone Wells: (<5.0) (770)
(1,400)
CD (88) (170)
(2,400) RW-1, RW-2, RW-3, RW-4, LPZ-2, LPZ-3, (7,600) (26,000) 24,000) LPZ-4, LPZ-5, UB-1, UB-2, UB-3, UB-4,
24,000 (750)
(72,000) (41) LB-1, LB-2, LB-3, LB-4 (<5.0) -20
26,000 2,700 7,200 Dry A/B-Zone Wells:
(42,000) DW1, DW2, DW3 (24,000) (2,100) (<5.0) (11) (36,0 (<25) CD (<250) <5.0) 427,000)
3,100 000
-20- (110,000) (19,000) .50,000 -30
(6,000)
(19.000) (68,000) ( 1.300 (58,000) (3,00^77 160 (49,000) -30 J INSERT A l40
Scale (Feet)
— 10,000 — 100
CDCD
ug/L
ug/kg
170,000
(7,400)
(24,000)
11,000
(1.700)
6,600
76,000
(28,000)

16.000
(7,700)
34,000
(600,000)
O
O)
(<5.0)
Dry
11301^

85.000
dry
TD
4,100 (4,^00)
FORMER

DEGREASING
TANK NO.1
MW-19, MW-26
B-Zone Wells:
0)
E
CD
Q
CD
05 E
X
o
-See Insert AFORMER

DEGREASING
TANK NO.1
05 >
CD
LU
O
05 E
X
o
Soil Borings:

CPT-26, CPT-30, FS-A4, FS-A5,
(68)
i,poo
Grab water sample attempted; inadequate water quantity recovered for analysis Total depth (feet below ground surface)
Micrograms per literMicrograms per kilogram
CD c >
O CD
RW-1 RW-2 FS-A4
CPT-26
UB-4/LB-4
(©CO
UB-1/LB-1 FS A5 GP-60 UB-2/LB-2ro GP-63 (no lithologic data collected) ro 2
E
x £ o o
28,000
(46c
LPZ-4 DW2
2,
(4,900)
u>cn co t-cm^
NN
FD=35 Feet T
D=35 5^eei— —'
1(34)
TD=34.5 Feet
(<5.0)
TD=35 Feet
-1,000
d^-10,000 •—
° - CO^'Vt-T 'cm
olu ra
^E-10-
Eo
Jl(1,100)
•=35 Feet TD=35 5 Feet
IU=35 5 Feet)

SCHEMATIC GEOLOGIC

CROSS-SECTION A-A'
FORMER DEGREASING TANK NO. 1

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
SGI
environmental
THE
Source Group, Inc.

Date:
2/9/08
Figure:
7 3451-C VINCENT ROAD
PLEASANT HILL CA 94523 Figures 7,8,9_cross sections aa, bb, cc.dwg LEGEND: (West) (East)
290
(110)
Q (D
100 — Approximate TCE isoconcentration contour (ug/L)
Soil Borings: CPT-29, CPT-32, FS-A8, FS-A9, FS-A11, GP-55, GP-56, GP-58A, GP-71,GP-77 Wells: RW-7, RW-10, RW-6, MW-29
Approximate grab groundwater sample or well screen interval. 10-i r0
o- - 10
0) 0
-10-
-20
0 -20-
-30
-30 J
L 40
TCE concentration in water (ug/L)TCE concentration in soil (ug/kg) 0)
o
p
o
000
0 Q
p
O
000
E
X
FORMER

DEGREASING
0 LU
0 TCE
dry
TD
ug/L
ug/kg
Trichloroethene
Grab water sample attempted; inadequate water quantity recovered for analysis Total depth (feet below ground surface)
Micrograms per liter
Micrograms per kilogram
<100 ug/L
100-1,000 ug/L
1,000-10,000 ug/L
10,000-100,000 ug/L
oo
as
0 0
(D
0 E
0 O
00 E
X
00 E
x
o
Fine-grained soil (silts and clays)
Coarse-grained soil (sands and gravels)
Fill

SCHEMATIC GEOLOGIC

CROSS SECTION B-B'
FORMER DEGREASING TANK NO. 4

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
fid ™E
environmental| SourceGroup, Inc.

Date:
3/21/08
Figure:
8 3451-C VINCENT ROAD
PLEASANT HILL, CA 94523 Figures 7,8,9_section AA,BB,CC.dwg <D
(West) <D (East)
I- RW13
SB-2 | SW-1 UB/LB-6 RW-8 GP-76 /GP-66
(5.4) (99)
2,10C Dry
TD=10 Feet -10 >7
(310)
(47) (41)
TD=15 Fee (34)
4,500 0)
600 640
(830) -20 (100) (950) (23) (14)
4,400- .(390) (800)
TDDry O
4,300 (85)/ -30-C
TD=3-1 Feet
1J100 (280)
TD<

5.9 D=4 ) Feet CD TD=40 Feet
10 feet —
-40 - -50 -
50 feet
TD=59 Feet
LEGEND:

Fine-grained soil (silts and clays)
Coarse-grained soil (sands and gravels)
Fill
TCE concentration in water (ug/L) l70
100 — Approximate TCE isoconcentration contour (ug/L) TCE concentration in soil (ug/kg) TD=7l Feet <100 ug/L
100-1,000 ug/L B-Zone Wells:1,000-10,000 ug/L C-Zone Wells:10,000-100,000 ug/L Not used in contouring Approximate grab groundwater sample or well screen interval. 1,500 (4^0)
(43,000) |
\8,90)
(70,0)0) |
(D
O
03 CD

LU CD Q
CD
E
X
o
CPT-1, CPT-33, CPT-34, FS-D4, GP-66, GP-76, SB-2, SW-1
MW-17

APPROXIMATE

FORMER SUMP

LOCATION
TCE
dry
TD
ug/L
ug/kg
Trichloroethene
Grab water sample attempted; inadequate water quantity recovered for analysis Total depth (feet below ground surface)
Micrograms per liter
Micrograms per kilogram
o
CD
Soil Borings:

A-Zone Wells:
(600)
(240)
LMW-2
SAZ-2 MW-17
LMW-6
LMW-10
1(170)
Feet
FS-D4 —।
(Projected)
CPT-1
LMW-2, LMW-6, LMW-10, RW-8, RW-9, RW-13, UB-6, LB-6
SAZ-2
CPT-34 RW-9
(36)
36*
-40<
TD=40 Feet
(580)
57,00 (J -II (120) TD=30 Feet (93) TD=30 Feet
>=35 feety1 TD=35 Feet
CPT-33
0 £ <2°)l
<88fe
1,500
60 -
290
(110)

SCHEMATIC GEOLOGIC

CROSS-SECTION C-C'

FORMER BREEZEWAY SUMP

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
Date:
3/21/08
Figure: SGI 9 THE environmental Source Group, Inc.
040l-G VINUtNI KUAU
PLEASANT HILL, CA 94523 figures 7,8,9_cross sections AA, BB.CC.dwg D D r 10
(West) (East)
10 —।
o
cd
0 -
co -10
-10 - 10 feet —
-20
-20 -
50 feet -30
-30 J
l40
LEGEND:
290
100 — Approximate TCE isoconcentration contour (ug/L) (110) Soil Borings: CB-17, CB-18, EB-1, EB-4, EB-6, FS-B2, FS-B3, FS-B5, FS-B6, GP-27, SW-6 Wells: MW-7, LMW-4, PZ-1, LMW-8, UB-5, LB-5
Approximate grab groundwater sample or well screen interval.

TCE concentration in water (ug/L)TCE concentration in soil (ug/kg) CD
05 oo
TCE
dry
TD
ug/L
ug/kg
Trichloroethene
Grab water sample attempted; inadequate water quantity recovered for analysis Total depth (feet below ground surface)
Micrograms per liter
Micrograms per kilogram
o
CD
05 CD
(/)
E
x
o
o
CD
<100 ug/L
100-1,000 ug/L1,000-10,000 ug/L10,000-100,000 ug/L
cu
CD
E
CD
05 CD
LU
CD
CD
Q
CD
05 E
X
o
Fine-grained soil (silts and clays)
Coarse-grained soil (sands and gravels)
Fill

SCHEMATIC GEOLOGIC

CROSS-SECTION D-D'

FORMER OIL/SOLVENT STORAGE AREA

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
Date: Figure:
10 I environmental|Source Group, Inc.
3451-C VINCENT ROAD
PLEASANT HILL, CA 94523
3/21/08
Figures 10,11,12_cross seclions DD.EE.FF.dwg
E E
r 10
(West) (East) 15 -i
10 - 0
0 - 0 - 10
-10 - -20
-20 - 10 feet —
-30
-30 J 0
50 feet
L 40
LEGEND:
290
(110)
Approximate grab groundwater sample or well screen interval.

TCE concentration in water (ug/L)TCE concentration in soil (ug/kg) £
o
CDCD
0 CDCD
0 CD
O
,0
Trichloroethene
Grab water sample attempted; inadequate water quantity recovered for analysis Total depth (feet below ground surface)
Micrograms per liter
Micrograms per kilogram
Approximate TCE isoconcentration contour (ug/L)
0 CD
0 CD
cn
o
0 CD
LU
0 0
E
CDCD
E
CD
CD
Q
CD
0 E
x
o
<100 ug/L
100-1,000 ug/L1,000-10,000 ug/L10,000-100,000 ug/L
>100,000 ug/L
Fine-grained soil (silts and clays)
Coarse-grained soil (sands and gravels)
Fill
Soil Borings: CPT-10, GP-83, GP-85, GP-87, TP-3
A/B-Zone Wells: MW-27, MW-28, LMW-9
TCE
dry
TD
ug/L
ug/kg
100 —

SCHEMATIC GEOLOGIC

CROSS SECTION E-E'

WESTERN PROPERTY BOUNDARY

FORMER KAISER AEROTECH FACILITIES
880 DOOLITTLE DRIVE & 498 HESTER STREET

SAN LEANDRO, CALIFORNIA
fid ™E
environmental| SourceGroup, Inc.
3451-C VINCENT ROAD
PLEASANT HILL, CA 94523
Date:
3/21/08
Figure:
11 Figures 10,11,12_cross sections DD.EE.FF.dwg
1 1| Planned A-Zone Injection Area
| Planned B-Zone Injection Area
SGI
environmental
APPENDIX C2

REMEDIATION ACTIVITIES
SAZ-1 SAZ-2 SAZ-3 LB-1 LB-2 LMW-1 LMW-2 LMW-3 LMW-4 LMW-5 LMW-6 LMW-7 LPZ-2 LPZ-3 LPZ-4 LPZ-5 MW-27 PZ-1 RW-1 RW-10 RW-11 RW-12 RW-13 RW-2 RW-3 RW-4 RW-5 RW-6 RW-7 UB-1 UB-2 LB-3 LB-4 LB-5 LB-6 LMW-8 LMW-10 UB-3 UB-4UB-5 UB-6 RW-9 MW-1 MW-10 MW-11 MW-12 MW-13 MW-15 MW-16 MW-17 MW-18 MW-20 MW-21 MW-22 MW-23 MW-24 MW-25 MW-26 MW-3 MW-4 MW-5 MW-6 MW-7 MW-8 MW-8A MW-9 PZ-2 MW-28 MW-29 MC-1 DW2 DW3 DW1 F-2 FA-1 FUB-1 RW-8 MW-19 LMW-9 MW-2MW-14 LEGEND A-zone Monitoring Well B-zone Monitoring Well Former Kaiser Aerotech Facilities Boundary Note: Wells DW1, DW2, DW3, F-2 and MW-27 are screened across portions of the A- and B-zones. C-zone Monitoring Well Destroyed Monitoring Well SITE PLAN WITH SUBSTRATE INJECTION WELLS 100500 Scale (feet) 2 After Apex, 2017 Basemap from Secor, June 25, 2002 N FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA 09/2020 DATE FIGURE Direct Push Sodium Lactate Injection Boring MW-28 Sodium Lactate Injection Well Table 2A
Sodium Lactate Injection Summary - Wells
Former Kaiser Aerotech Facilities
San Leandro, California

Page 1 of 2 ends

Estimated
Injection Rate
(gpm)
~20% Sodium Lactate
Estimated Volume
Injected (gallons)
Estimated
Injection Rate
(gpm)
~20% Sodium Lactate
Estimated Volume
Injected (gallons)
Estimated
Injection Rate
(gpm)
~10% Sodium Lactate
Estimated Volume
Injected (gallons)
PZ-2 6/4/08, 6/6/08 -- -- 0.5* 90 -- -- 90
MW-22 6/9/08 -- -- 0.6* 50 -- -- 50
MW-23 6/4/08 -- -- 0.5* 55 -- -- 55
MW-26 6/10/08 -- -- 1.0* 50 -- -- 50
MW-29 9/12/18 - - - - 4.5 650 650
UB-1 6/12/08 -- -- 5.0 455 -- -- 455
LB-1 6/11/08-6/12/08 -- -- 4.0 454 -- -- 454
UB-2 6/2/08-6/3/08 -- -- 3.0 468 -- -- 468
LB-2 6/2/08-6/3/08 -- -- 4.0 518 -- -- 518
4/3/06-4/5/06 2.0-5.0 900 -- -- -- --
6/2/08 -- -- 4.0 445 -- --
5/17/10 -- -- 4.5 350 -- --
4/3/06-4/5/06 3.0-4.0 900 -- -- -- --
6/2/08, 6/4/08 -- -- 5.0 440 -- --
5/17/10-5/18/10 -- -- 3.5-4.5 350 -- --
6/11/08-6/12/08 -- -- 3.0 454 -- --
5/17/10 -- -- 4.75-5.0 350 -- --
7/29/13 -- -- -- -- 3.8-4.7 543
9/11/18-9/12/18 -- -- -- -- 3.6 1,090
6/11/08 -- -- 6.0 440 -- --
7/29/13 -- -- -- -- 2.8-4.3 532
6/4/08 -- -- 4.0 457 -- --
7/30/13 -- -- -- -- 3.25-4.2 1,076
6/4/08 -- -- 4.0 456 -- --
7/30/13 -- -- -- -- 3.8-4.0 1,209
10/18/11-10/19/11 -- -- 3-4.25 400 -- --
7/30/13 -- -- -- -- 3.8-3.9 564
10/21/11 -- -- 1.5-3.0 435 -- --
7/31/13 -- -- -- -- 3.1-3.2 243
10/19/11 -- -- 3.0-5.0 400 -- --
7/31/13 -- -- -- -- 4.0-4.2 308
10/19/11-10/20/11 -- -- 1.5-3.25 400 -- --
7/31/13 -- -- -- -- 4.8-5.0 314
RW-5 6/5/08-6/13/08 -- -- 0.5 620 -- --
9/26/18 -- -- -- -- 5.0 80
9/26/18 -- -- -- -- 0.7* 68
RW-6 6/5/08-6/6/08 -- -- 2.0 949 -- --
9/11/2018 - 9/26/18 -- -- -- -- 4.0-4.5 440
9/11/2018 - 9/26/18 -- -- -- -- 0.3* 55
-- -- -- --
RW-7 5/19/09-5/20/09 -- -- 2.5-3.0 967 -- -- 967
RW-10 5/21/09 -- -- 3.0-3.5 552 -- -- 552
8/23/05 2.0-5.0 400 -- -- -- --
6/11/08 -- -- 4.0 200 -- --
6/13/05-6/15/05 1.0-1.5* 400 -- -- -- --
7/26/05 2.5-5.0 400 -- -- -- --
6/6/08 -- -- 5.0 200 -- --
7/31/13 -- -- -- -- 4.7-4.8 570
9/12/18 -- -- -- -- 4.8-5.0 1,310
Breezeway Sump
LPZ-4 972
RW-1 1,695
RW-2 1,690
LPZ-3 2,437
RW-13 2,880
RW-11 600
LB-3 678
UB-4 708
LB-4 714
1,444
Gravity fed 48 gallons 60% sodium lactate
and 20 gallons chase water
768
Gravity fed 35 gallons 60% sodium lactate
and 20 gallons chase water
Degreasing Tank No. 4

PILOT INJECTION ACTIVITIES RDIP INJECTION ACTIVITIES O&M INJECTION ACTIVITIES Total Fluid Volume
Injected To Date
(gallons)
Well ID Injection Date(s)
RW-3 1,533
RW-4 1,665
UB-3 964
A-zone Hotspots
Degreasing Tank No. 1
Table 2A
Sodium Lactate Injection Summary - Wells
Former Kaiser Aerotech Facilities
San Leandro, California

Page 2 of 2 ends

Estimated
Injection Rate
(gpm)
~20% Sodium Lactate
Estimated Volume
Injected (gallons)
Estimated
Injection Rate
(gpm)
~20% Sodium Lactate
Estimated Volume
Injected (gallons)
Estimated
Injection Rate
(gpm)
~10% Sodium Lactate
Estimated Volume
Injected (gallons)

PILOT INJECTION ACTIVITIES RDIP INJECTION ACTIVITIES O&M INJECTION ACTIVITIES Total Fluid Volume
Injected To Date
(gallons)
Well ID Injection Date(s)
6/13/05-6/15/05 1.75-4.0* 600 A-zone Hotspots -- -- -- -- 7/26/05 3.0-5.0 400 -- -- -- --
8/23/05 5.0 400 -- -- -- --
6/6/08 -- -- 4.5 200 -- --
6/11/08 -- -- 5.0 207 -- --
7/30/13 -- -- -- -- 3.9-4.9 1,223
9/10/18-9/12/18 -- -- -- -- 3.6-4.2 880
5/20/09 -- -- 2.5-3.0 283 -- --
7/31/13 -- -- -- -- 3.8-4.3 505
RW-9 10/21/09 -- -- 0.5-4.0 280 -- -- 280
UB-6 10/20/11 -- -- 3.5-4.25 200 -- --
9/10/18 -- -- -- -- 3.0-4.0 994
10/20/11 -- -- 4.0-5.0 200 -- --
7/31/13 -- -- -- -- 3.8-4.6 475
10/20/11 -- -- 5.5 200 -- --
7/31/13 -- -- -- -- 4.8-5.4 764
9/10/18-9/11/18 -- -- -- -- 3.0-4.6 1,480
LMW-4 6/9/08-6/10/08 -- -- 3.5 874 -- -- 874
LMW-8 6/10/08-6/11/08 -- -- 4.0 851 -- -- 851
UB-5 10/22/09-10/23/09 -- -- 4.5-5.0 855 -- -- 855
LB-5 10/22/09 -- -- 4.5 856 -- -- 856
LMW-1 5/20/09 -- -- 2.5-3.0 153 -- -- 153
6/13/08 -- -- 2.0 200 -- --
9/30/08-10/1/08 -- -- 5.0 1,156 -- --
LMW-9 11/17/09-11/18/09 -- -- 4.5-7.9 1,107 -- --
9/11/18 -- -- -- -- 3.6-4.0 680
MW-18 5/18/10 -- -- 5.0 54 -- --
9/11/18 -- -- -- -- 4.0 290
MW-28 5/18/10 -- -- 4.5-5.0 200 -- --
9/11/18 -- -- -- -- 3.8-4.0 460
Totals 4,400 18,881 16,802 40,083
Notes:
gpm = gallons per minute
* Gravity Feed
Oil/Solvent Storage Area
Receiving Dock
Railroad/Western Boundary
LMW-2 2,444
MW-27 1,356
LMW-10 2,310
RW-8 788
LB-6 675
LMW-6 1,600
1,194
1,787
344
660
Includes 34 gallons water
Table 2B
Sodium Lactate Injection Summary - Direct-Push Borings
Former Kaiser Aerotech Facilities
San Leandro, California

Page 1 of 5 ends

Estimated
Injection Rate
(gpm)
Total ~20% Sodium
Lactate Estimated
Volume Injected
(gallons)
HS-1 3/18/09 11-15 1.8 30 near well MW-26
HS-2 3/18/09 11-15 1.6 50 near well MW-26
HS-3 11/14/08 5-15 3.7 48 near well MW-23
HS-4 11/14/08 5-15 3.9-4.3 48 near well MW-23
HS-5 11/14/08 5-15 4 48 near well MW-23
DT1-1 10/23/08 7-15 3.4 29
DT1-2 10/23/08 8-15 3.8 29
DT1-3 10/23/08 5-35 5.4-5.5 229
DT1-4 10/23/08 6-15 3.2 29
DT1-5 10/22/08 8-35 3.3-4.6 229
DT1-6 10/22/08 15-35 5.2-5.3 200
DT1-7 10/23/08 15-35 5.2 200
DT1-8 10/23/08 6-15 2.4 29
DT1-9 10/22/08 15-35 4.9-5.1 200
DT1-10 10/21/08 15-35 4.8-5.4 200
DT1-11 10/21/08 15-35 5.2-5.6 200
DT1-12 10/21/08 15-35 4.8-5.0 200
DT1-13 10/20/08 15-35 8.4-8.9 200
DT1-14 10/20/08 15-35 1.7-8.9 200
DT1-15 10/21/08 15-35 5.3-5.5 200
DT1-16 10/20/08 15-35 5.0-9.0 200
DT1-17 10/20/09 15-35 3.5-8.3 200
DT1-18 10/20/09 15-35 4.1-10.1 200
DT1-19 10/21/09 15-35 3.0-7.2 400
DT1-20 10/20/09 15-35 4.0-7.1 400
DT1-21 10/20/09 15-35 2.5-8.5 200
DT1-22 10/20/09 15-35 3.9-10.7 200
DT1-23 4/1/10 5-15 3.4-3.5 30
DT1-24 4/1/10 5-15 3.5 30
DT1-25 4/1/10 5-15 3.3-3.8 30
DT1-26 4/1/10 5-15 4.2-4.7 30
DT1-27 3/26/10 15-35 9.3-9.4 440
DT1-28 3/26/10 15-35 9.2-9.3 440
DT1-29 4/1/10 5-15 3.8-4.1 30
DT1-30 3/29/10 6-35 4.2-9.4 469
DT1-31 3/26/10 15-35 8.9-9.1 440
DT1-32 3/26/10 15-35 9.0-9.2 440
DT1-33 3/29/10 15-35 9.2-9.3 300
DT1-34 4/1/10 5-15 4.1 30
A-zone Hotspots
Degreasing Tank No. 1

RDIP INJECTION ACTIVITIES
Boring ID Injection Date(s) Notes
Injection
Interval
(feet bgs)
Table 2B
Sodium Lactate Injection Summary - Direct-Push Borings
Former Kaiser Aerotech Facilities
San Leandro, California

Page 2 of 5 ends

Estimated
Injection Rate
(gpm)
Total ~20% Sodium
Lactate Estimated
Volume Injected
(gallons)
A-zone Hotspots

RDIP INJECTION ACTIVITIES
Boring ID Injection Date(s) Notes
Injection
Interval
(feet bgs)
DT1-35 3/29/10 6-35 4.1-9.3 468
DT1-36 3/29/10 15-35 9.3 300
DT1-37 3/30/10 15-35 9.4-9.5 440
DT1-38 3/30/10 15-35 9.3 300
DT1-39 3/30/10 15-35 9.3 300
DT1-40 3/30/10 15-35 9.2-9.3 440
DT1-41 3/30/10 15-35 9.2-9.3 300
DT1-42 3/31/10 15-35 7.8-8.3 300
DT1-43 3/31/10 15-35 9.4-9.5 440
DT1-44 3/31/10 15-35 8.6-9.2 300
DT1-45 3/31/10 15-35 9.2-9.3 300
DT1-46 3/31/10 15-35 9.1-9.3 440
DT1-47 4/2/10 15-35 8.4-9.2 300
DT1-48 4/1/10 15-35 9.2-9.3 300
DT1-49 4/1/10 15-35 9.4-9.5 300
DT1-50 4/2/10 15-35 7.8-9.0 300
DT1-51 4/1/10 15-35 9.2-9.3 300
DT1-52 4/2/10 15-35 6.3-7.5 300
DT1-53 4/2/10 15-35 6.9-9.1 300
DT1-54 4/1/10 15-35 9.0-9.3 300
DT1-55 5/3/10 15-35 9.1-9.2 300
DT1-56 5/3/10 15-35 2.9-3.1 300
DT1-57 5/4/10 15-35 9.3-9.5 300
DT1-58 5/3/10 15-35 9.0-9.3 300
DT1-59 5/3/10 15-35 1.3-2.6 300
DT1-60 5/10/10 15-35 7.1-9.4 300
DT1-61 5/10/10 15-35 9.2-9.4 200
DT1-62 5/10/10 15-35 9.5 200
DT1-63 5/10/10 15-35 9.2-9.4 200
DT1-64 5/10/10 15-35 9.3-9.5 200
DT4-1 11/13/08 15-35 6.0-7.5 200
DT4-2 11/13/08 15-35 2.7-4.7 200
DT4-3 11/13/08 15-35 3.9-4.5 200
DT4-4 11/13/08 5-15 1.4 11
DT4-5 6/4/09 15-35 0.9-2.4 263 surfacing observed
DT4-6A 6/4/09 33-35 -- 30 surfacing observed
DT4-6B 6/5/09 30-32 <2.5 5 surfacing observed
DT4-6 6/5/09 15-28 0.2-5.8 220
DT4-7A 6/4/09 30-35 -- 35 surfacing observed
DT4-7 6/5/09 15-32 0.8-5.7 295
DT4-8 6/5/09 15-35 1.0-3.9 295
Degreasing Tank No. 4
Table 2B
Sodium Lactate Injection Summary - Direct-Push Borings
Former Kaiser Aerotech Facilities
San Leandro, California

Page 3 of 5 ends

Estimated
Injection Rate
(gpm)
Total ~20% Sodium
Lactate Estimated
Volume Injected
(gallons)
A-zone Hotspots

RDIP INJECTION ACTIVITIES
Boring ID Injection Date(s) Notes
Injection
Interval
(feet bgs)
BS-1 11/10/08 12-35 2.9-4.6 230 surfacing due to fill material BS-2 10/24/08 10-35 2.4-4.8 230 surfacing due to fill material BS-3 11/10/08 15-35 4.2-4.9 200
BS-4 10/21/09 15-35 3.7-7.2 183
BS-5 10/21/09 15-35 5.1-7.9 200
BS-6 5/4/10 15-35 9.3-9.4 200
BS-7 5/4/10 15-35 9.2-9.4 200
BS-8 5/4/10 15-35 9.3-9.4 200
BS-9 5/4/10 15-35 9.2-9.4 200
BS-10 5/4/10 15-35 9.3-9.4 200
BS-11 5/5/10 15-35 9.4-9.5 200
BS-12 5/10/10 15-35 9.4 200
BS-13 5/5/10 15-35 9.3-9.4 200
BS-14 5/10/10 15-35 9.3-9.4 300
BS-15 5/5/10 15-35 4.1-9.4 300
BS-17 5/5/10 15-35 8.8-9.4 200
BS-18 5/6/10 15-35 9.4-9.5 200
BS-19 5/5/10 15-35 9.2-9.3 200
BS-20 5/5/10 15-35 9.2-9.3 200
BS-21 5/5/10 15-35 9.3-9.4 200
OSS-1 11/12/08 15-30 6.4-7.9 150
OSS-2 11/11/08 15-30 7.7-7.9 150
OSS-3 11/11/08 15-30 7.3-8.1 150
OSS-4 11/10/08 15-30 9.4-9.6 150
OSS-5 11/11/08 15-30 6.5-7.8 150
OSS-6 11/12/08 15-30 6.6-6.7 150
OSS-7 11/11/08 15-30 9.7 150
OSS-8 11/11/08 15-30 7.4-8.2 150
OSS-9 11/11/08 15-30 7.5-7.7 150
OSS-10 11/12/08 15-30 7.0 150
OSS-11 11/12/08 15-30 8.1 150
OSS-12 11/12/08 15-30 7.0-8.0 150
OSS-13 11/12/08 15-30 8.2-8.7 150
OSS-14 11/12/08 15-30 7.0 150
OSS-15 10/19/09 15-30 2.0-6.9 150
OSS-16 10/20/09 15-30 3.3-7.6 150
OSS-17 10/19/09 15-30 2.2-7.6 150
OSS-18 10/19/09 15-30 3.3-6.9 150
OSS-19 10/19/09 15-30 5.5-7.2 150
Breezeway Sump
Oil/Solvent Storage Area
Table 2B
Sodium Lactate Injection Summary - Direct-Push Borings
Former Kaiser Aerotech Facilities
San Leandro, California

Page 4 of 5 ends

Estimated
Injection Rate
(gpm)
Total ~20% Sodium
Lactate Estimated
Volume Injected
(gallons)
A-zone Hotspots

RDIP INJECTION ACTIVITIES
Boring ID Injection Date(s) Notes
Injection
Interval
(feet bgs)
OSS-20 5/7/10 15-30 9.3 300
OSS-21 10/19/09 15-30 2.3-5.6 150
OSS-22 5/12/10 15-30 9.3-9.4 300
OSS-23 5/12/10 15-30 9.4 300
OSS-24 5/7/10 15-30 9.3-9.4 300
OSS-25 5/7/10 15-30 9.3 300
OSS-26 5/12/10 15-30 9.4 150
OSS-27 5/7/10 15-30 9.3-9.5 150
OSS-28 5/12/10 15-30 9.3-9.5 150
OSS-29 5/6/10 15-30 9.3-9.4 150
OSS-30 5/6/10 15-30 9.2-9.4 150
OSS-31 5/11/10 15-30 9.4 150
OSS-32 5/11/10 15-30 9.5 150
OSS-33 5/6/10 15-30 9.2-9.4 150
OSS-34 5/11/10 15-30 9.4-9.5 150
OSS-35 5/6/10 15-30 9.3 150
OSS-36 5/11/10 15-30 9.4 150
OSS-37 5/11/10 15-30 9.3-9.4 150
OSS-38 5/11/10 15-30 9.4-9.5 150
OSS-39 5/11/10 15-30 9.3-9.4 150
OSS-40 5/12/10 15-30 9.4 150
OSS-41 5/7/10 15-30 6.5-9.4 150
OSS-42 5/11/10 15-30 7.2-9.4 150
OSS-43 5/7/10 15-30 9.3-9.5 150
RD-1 6/4/09 5-15 2.2-3.5 43
RD-2 6/4/09 5-15 3.7-5.3 43
RD-3 6/3/09 15-35 5.0-8.8 155
RD-4 6/3/09 15-35 2.5-7.0 155
RD-5 6/3/09 15-35 2.7-8.8 155
RD-6 6/3/09 15-35 4.0-5.0 155
RD-7 6/3/09 15-35 4.4-5.7 155
RD-8 6/4/09 15-35 3.6-7.0 155
RD-9 6/3/09 15-35 2.1-4.4 155
RD-10 6/4/09 15-35 4.4-5.7 155
RD-11 6/2/09 15-35 2.1-4.4 155
RD-12 6/4/09 15-35 3.6-5.0 155
RD-13 6/2/09 15-35 2.4-4.4 155
RD-14 6/1/09 15-35 0.6-1.1 155
RD-15 6/2/09 15-35 1.4-1.8 155
RD-16 6/1/09 15-35 1.1-1.7 155
Receiving Dock
Table 2B
Sodium Lactate Injection Summary - Direct-Push Borings
Former Kaiser Aerotech Facilities
San Leandro, California

Page 5 of 5 ends

Estimated
Injection Rate
(gpm)
Total ~20% Sodium
Lactate Estimated
Volume Injected
(gallons)
A-zone Hotspots

RDIP INJECTION ACTIVITIES
Boring ID Injection Date(s) Notes
Injection
Interval
(feet bgs)
RD-17 6/2/09 15-35 2.3-2.7 155
RD-18 6/2/09 15-35 0.9-1.8 112 surfacing 23 feet bgs
RD-19 3/22/10-3/23/10 15-35 4.1-5.4 157
RD-20 3/23/10 15-35 5.5-5.8 157
RD-21 3/26/10 15-35 7.6-8.0 157
RD-22 3/23/10 15-35 5.4-5.7 157
RD-23 3/23/10 15-35 5.5-5.8 157
RD-24 3/23/10 15-35 1.5 3 surfacing 32 feet bgs
RD-24A 3/24/10 15-35 4.1-7.1 157
RD-25 3/24/10 15-35 6.0-6.9 157
RD-26 3/23/10 15-35 5.3-5.9 157
RD-27 3/24/10 15-35 5.8-7.0 157
RD-28 3/24/10 15-35 6.4-7.5 157
RD-29 3/25/10 15-35 6.3-7.6 157
RD-30 3/24/10 15-35 6.9-7.8 157
RD-31 3/24/10 15-35 6.3-7.4 157
RD-32 3/25/10 15-35 4.4-7.6 157
RD-33 3/25/10 15-35 6.9-7.6 157
RD-34 3/25/10 15-35 6.2-7.6 157
RD-35 3/25/10 15-35 7.4-7.6 157
RD-36 3/25/10 15-35 6.9-7.4 157
WPB-1 3/18/09 8-20 0.5-5.5 89 surfacing due to fill material WPB-2 11/14/08 8-15 3.1 58
WPB-3 11/14/08 8-20 4.4-5.1 100
WPB-4 3/18/09 5-15 7.0 52
WPB-5 5/6/10 5-20 9.4-9.6 150
WPB-6 5/6/10 5-20 9.4 150
WPB-7 5/6/10 5-20 9.3-9.4 150
Total 35,733
Notes:

RDIP = Remedial Design and Implementation Plan
bgs = below ground surface
gpm = gallons per minute
Railroad/Western Boundary
APPENDIX C3

HISTORICAL SOIL DATA
Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 1 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) B-1, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-1, 2' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 5.1 <5.0 <5.0 <5.0 <5.0 <5.0 6.1 <5.0 <5.0 <5.0 <5.0 B-2, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-2, 2.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-3, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-3, 2' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-4, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 <5.0 <5.0 <5.0 B-4, 2' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 <5.0 <5.0 <5.0 B-5, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 <5.0 B-5, 2' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 230 <5.0 <5.0 <5.0 <5.0 B-5, 5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-6, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 B-6, 2.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 6.1 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 <5.0 <5.0 B-8, 0.5' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 300 <5.0 <5.0 <5.0 B-8, 2' VZ 6/15/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 SW-3, 5.5' VZ 11/1/95 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 530 1,400 380 <50 <50 SW-6, 5.5' VZ 11/1/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 SW-8, 4.0' VZ 11/2/95 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-1, 2.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 110 <15 <15 <15 <50 GP-1, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-2, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 50 <15 <15 <15 <50 GP-2, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-3, 2.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-3, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-4, 1.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-4, 4' VZ 10/8/96 21 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-5, 1.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 36 <15 <15 <15 <50 GP-5, 3' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-6, 1.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 270 <15 <15 <15 <50 GP-6, 3.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-7, 1' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 290 <15 <15 <15 <50 GP-7, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-8, 2.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-8, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-9, 1' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 30 69 <15 <15 <50 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 2 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-9, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-10, 1' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 59 31 <15 <15 <50 GP-10, 3.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-11, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 140 <15 <15 <15 <50 GP-11, 3.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 31 <15 <15 <15 <50 GP-12, 1' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-12, 3.5' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-13, 3' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-14, 1.5' VZ 10/8/96 <30 <30 <30 <30 <30 <100 <100 1,400 560 <100 <30 <30 <30 <30 <30 <100 GP-14, 3' VZ 10/8/96 <30 <30 <30 <30 <30 <100 <100 2,200 34 <100 <30 <30 30 <30 <30 <100 GP-15, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-15, 3' VZ 10/8/96 <750 <750 <750 <750 <750 <2,500 <2,500 <750 <750 <2,500 <750 <750 <750 <750 <750 <2,500 GP-16, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-16, 3' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-17, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 55 150 26 <15 <50 GP-17, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 170 <15 <15 <50 GP-18, 2' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 22 <15 <15 <15 <50 GP-18, 4' VZ 10/8/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 26 20 <15 <15 <50 GP-19, 1' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-19, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-20, 0.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-20, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-21, 1.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-21, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-22, 2' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-22, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 53 <15 <15 <50 GP-23, 1' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-23, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 17 <15 <15 <50 GP-24, 1' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-24, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-25, 2' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-25, 4' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 230 <15 <50 <15 <15 <15 <15 <15 <50 GP-26, 2' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-26, 4' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-27, 2' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 250 <15 <15 <15 <50 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 3 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-27, 4' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-28, 3' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-28, 4.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-29, 3' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-29, 4.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-30, 2.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-30, 4.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-31A, 4' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-32, 8' A 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-33, 2' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 300 17 <15 <15 <50 GP-33, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 19 <15 <15 <15 <50 GP-34, 1.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-34, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-35, 1.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-35, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 GP-36, 1.5' VZ 10/9/96 <15 <15 <15 16 <15 <50 <50 <15 <15 <50 <15 27 <15 <15 <15 <50 GP-36, 3.5' VZ 10/9/96 <15 <15 <15 <15 <15 <50 <50 <15 <15 <50 <15 <15 <15 <15 <15 <50 MW-1, 2.5' VZ 10/30/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-1, 9' A 10/30/96 <850 1,500 3,900 9,300 <850 <850 <850 <850 <850 <850 <850 <850 <850 <850 <850 <850 MW-2, 2.5' VZ 10/30/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-3, 3' VZ 10/29/96 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 1,000 <25 <25 <25 <25 MW-4, 3' VZ 10/29/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 68 37 10 <5.0 <5.0 MW-5, 2.5' VZ 10/29/96 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 430 24 <25 <25 <25 MW-6, 3' VZ 10/29/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-8, 3.5' VZ 10/28/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 MW-10, 2.5' VZ 10/29/96 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-1, 15.5' B 10/28/96 <30 <30 <30 <30 <30 <100 <100 <30 <30 <100 <30 830 200 <30 <30 <100 EB-1, 28' B 10/28/96 <150 <150 <150 <150 <150 <500 <500 <150 <150 <500 <150 1,100 <150 <150 <150 <500 EB-2, 11' A 10/30/96 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 <5,000 100,000 <5,000 <5,000 <5,000 <5,000 EB-3, 6' A 3/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-3, 12.5' A 3/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 EB-3, 20.0' B 3/3/97 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 360 71 <10 <10 <10 EB-3, 31.0' B 3/3/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 5,100 <50 <50 <50 <50 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 4 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) EB-4, 7.5' A 3/3/97 11 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.8 <5.0 EB-4, 19.5' B 3/3/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 530 <50 <50 <50 EB-4, 22.5' B 3/3/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 420 <50 <50 <50 EB-4, 27.0' B 3/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-5, 9.5' A 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 26 42 <5.0 <5.0 <5.0 EB-5, 16.5' B 3/4/97 <10 <11 <12 <10 <10 <10 <10 <10 <10 <10 <10 <10 200 <10 <10 <10 EB-5, 20.0' B 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 78 <5.0 <5.0 <5.0 EB-5, 29.0' B 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-6, 9.5' A 3/4/97 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 90 210 <10 <10 <10 EB-6, 15.5' B 3/4/97 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 3,000 1,000 <100 <100 <100 EB-6, 20.0' B 3/4/97 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 3,100 <100 <100 160 EB-6, 31' B 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 27 <5.0 <5.0 <5.0 <5.0 EB-7, 11' A 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-7, 14' A 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-7, 20' B 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-7, 31' B 3/4/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-8, 11' A 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-8, 15' A 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-8, 21.5' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-8, 33' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-9, 8.0' A 3/5/97 140 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 730 88 <50 <50 <50 EB-9, 11.0' A 3/5/97 85 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 690 120 <50 <50 <50 EB-9, 20' B 3/5/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 1,900 <50 <50 <50 <50 EB-9, 23.5' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 26 <5.0 <5.0 <5.0 <5.0 EB-9, 33' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-10, 10' A 3/5/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 150 470 71 <50 <50 EB-10, 16.0' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.9 9.2 <5.0 <5.0 <5.0 EB-10, 20.0' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-10, 23.5' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-10, 30' B 3/5/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-11, 10.0' A 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 40 86 8.3 <5.0 <5.0 EB-11, 16.0' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 15 <5.0 <5.0 <5.0 EB-11, 24.0' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-12, 10.0' A 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 32 99 12 <5.0 <5.0 EB-12, 18.5' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 130 17 <5.0 5.6 EB-13, 5.5' VZ 4/2/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 250 <50 <50 <50 <50 EB-13, 17.0' B 4/2/97 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 3,600 <100 <100 <100 <100 EB-13, 26.0' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-13, 29.5' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.5 <5.0 <5.0 <5.0 <5.0 EB-14, 9.0' A 4/2/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 300 <50 <50 <50 <50 EB-14, 19.5' B 4/2/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 340 <50 <50 <50 <50 EB-14, 29.5' B 4/2/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 5 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) EB-15, 7.0' A 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 9.2 <5.0 <5.0 EB-15, 10.5' A 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 110 13 <5.0 <5.0 EB-15, 14.5' A 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 26 <5.0 <5.0 <5.0 EB-16, 8.5' A 4/3/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 230 <50 <50 <50 <50 EB-16, 12.5' A 4/3/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 210 <50 <50 <50 <50 EB-16, 29.5' B 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-17, 15.0' A 4/3/97 <50 <51 <52 <50 <50 <50 <50 <50 <50 <50 <50 <50 190 <50 <50 <50 EB-17, 29.5' B 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 EB-18, 9.5' A 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.3 53 15 <5.0 <5.0 EB-18, 14.0' A 4/3/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-1, 2' VZ 5/8/97 <400 <200 <400 <70 <50 <200 <60 <70 <40 <50 <50 <30 <40 <40 <30 <50 CB-1s, 2' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 <5.0 <5.0 28 100 <5.0 <5.0 <5.0 CB-1, 7' A 5/8/97 <400 <200 <400 <70 <50 <200 <60 <70 <40 <50 <50 <30 <40 <40 <30 <50 CB-1s, 11.5' A 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-1s, 13.5' A 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-1s, 17.5' B 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-2, 2' VZ 5/8/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-2s, 2' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-2, 5.5' VZ 5/8/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-2s, 5.5' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 6.8 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-3, 3' VZ 5/8/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-3s, 3' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 26 8.4 <5.0 <5.0 <5.0 CB-3, 4' VZ 5/8/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 40 <40 <40 <30 <50 CB-4, 2.5' VZ 5/8/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-4, 4.5' VZ 5/8/97 <400 <200 <400 <70 <50 300 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-5, 2.5' VZ 5/8/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-5s, 2.5' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-5, 6.5' A 5/8/97 <400 <200 <400 <70 <50 300 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-5s, 6.5' A 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-6, 2.5' VZ 5/8/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-6, 6.5' A 5/8/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-7, 1.5' VZ 5/8/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 <30 60 <40 <30 <50 CB-7s, 1.5' VZ 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-7, 6' A 5/8/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 30 <40 <40 <30 <50 CB-7s, 11.5' A 5/8/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 <5.0 <5.0 CB-10, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-10, 5.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-10s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 7.1 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-11, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-11, 5.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-11s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 5.7 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 6 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) CB-12, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 510 <40 <40 <30 <50 CB-12s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 6.1 <5.0 <5.0 <5.0 <5.0 <5.0 77 <5.0 <5.0 <5.0 <5.0 CB-12, 4.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-13, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 600 <40 <40 <30 <50 CB-13s, 2.5' VZ 5/9/97 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 350 <10 <10 <10 <10 CB-13, 5.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 80 <40 <40 <30 <50 CB-13s, 5.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 180 13 <5.0 <5.0 <5.0 CB-13s, 10' A 5/9/97 <50 <50 <50 <50 <50 <50 <5.0 <50 <50 <50 <50 1,300 140 <50 <50 <50 CB-14, 1.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-14s, 1.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-15, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-15s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-15, 6.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-15s, 6.5' A 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-16, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 30 <40 <40 <30 <50 CB-16s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-16, 6.5' A 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 30 <40 <40 <30 <50 CB-16s, 6.5' A 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-17, 1.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-17s, 1.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-17, 4.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-17s, 4.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-18, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-18s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-18, 6' A 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-19, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-19s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-19, 4.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-19s, 4.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-20, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-20s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 11 <5.0 <5.0 <5.0 <5.0 <5.0 7.0 <5.0 <5.0 <5.0 <5.0 CB-20, 5.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-21, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-21s, 2.5' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-21, 5.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-22, 2.5' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-22s, 3' VZ 5/9/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-22, 4' VZ 5/9/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-23, 2.5' VZ 5/12/97 <400 <200 <400 <70 <50 200 <60 <50 <40 <50 <50 130 <40 <40 <30 <50 CB-23s, 2.5' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-24, 2.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-25, 2.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-25s, 2.5' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.3 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 7 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) CB-25, 4.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-26, 2.5' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-26, 4.0' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-27, 2.5' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-27s, 2.5' VZ 5/15/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-27, 5.5' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-28, 2.5' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 320 <40 <40 <30 <50 CB-28s, 2.5' VZ 5/15/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 1,100 <50 <50 <50 <50 CB-28, 6.5' A 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 230 50 <40 <30 <50 CB-29, 2' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-29s, 2' VZ 5/15/97 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-30, 3' VZ 5/15/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-30s, 3' VZ 5/15/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-31, 2' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 110 <40 <40 <30 <50 CB-31s, 2' VZ 5/16/97 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 240 <50 <50 <50 <50 CB-31, 4.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 110 <40 <40 <30 <50 CB-32, 0.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 3,000 270 <50 <50 60 <40 <40 <30 <50 CB-32, 4.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 1,300 350 <50 <50 <30 210 <40 <30 <50 CB-33, 2.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-33, 5.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-34, 1' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-34s, 1.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 5.4 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-34, 4.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-34s, 4.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-35, 1.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-35, 4.5' VZ 5/12/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-36, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 240 <40 <40 <30 <50 CB-36s, 2.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.7 <5.0 <5.0 <5.0 <5.0 CB-36, 7' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 420 70 <40 <30 <50 CB-37, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-37s, 2.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-37, 6.5' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 90 <40 <40 <30 <50 CB-38s, 1.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-38, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-39, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-39s, 3.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-40, 2' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-40s, 2' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 7.9 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.1 <5.0 <5.0 <5.0 CB-40, 6.5' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-40s, 6.5' A 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 7.3 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-40s, 10' A 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 100 130 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 8 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) CB-41, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-41s, 2.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-41, 6.5' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-42, 2.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-42, 6' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-43, 3' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 320 <40 <40 <30 <50 CB-43s, 3' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 9.4 <5.0 <5.0 <5.0 <5.0 <5.0 190 <5.0 <5.0 <5.0 <5.0 CB-43, 5.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 500 <40 <40 <30 <50 CB-44, 3.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-44, 7' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-45s, 2' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 5.7 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-45, 3' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-45, 7' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-46, 3' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-46s, 4' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 17 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 CB-46, 6' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-47s, 2.5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 9.2 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-47, 3.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 30 <40 <40 <30 <50 CB-47s, 5' VZ 5/16/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CB-47, 6' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-48, 3.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-48, 5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-49, 4' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-49, 6' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-50, 3' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-50, 5.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-50, 7' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-50, 8' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-51, 3.5' VZ 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CB-51, 6' A 5/16/97 <400 <200 <400 <70 <50 <200 <60 <50 <40 <50 <50 <30 <40 <40 <30 <50 CSS-1, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-2, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-3, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-4, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 22 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-5, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-6 GS A 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CSS-7, 1' VZ 5/12/97 8.3 <5.0 <5.0 <5.0 <5.0 18 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 42 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 9 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) CSS-8, 1' VZ 5/12/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-12, 5.5' VZ 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-12, 9.0' A 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-13, 4.0' VZ 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 10 <5.0 <5.0 <5.0 MW-13, 9.5' A 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 <5.0 MW-14, 4.5' VZ 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-14, 8.5' A 3/6/97 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-37,4' VZ 8/17/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-38, 15' A 8/17/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 6.3 61 10 <5.0 <5.0 GP-39, 10' A 8/17/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 27 <5.0 <5.0 <5.0 <5.0 GP-40, 1' VZ 8/17/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-40, 7' A 8/17/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 180 14 <5.0 <5.0 <5.0 GP-41, 2.5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 93 <5.0 <5.0 <5.0 <5.0 GP-41,15' A 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 170 14 <5.0 <5.0 <5.0 GP-42, 2.5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 20 36 19 <5.0 <5.0 GP-42, 9.5' A 8/18/98 <12 <13 <14 <12 <12 <12 <24 <12 <12 <24 <12 87 <12 <12 <12 <12 GP-43, 2' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 17 <5.0 <5.0 <5.0 <5.0 GP-43, 10' A 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 92 14 <5.0 <5.0 <5.0 GP-44, 2' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-44, 5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 11 <5.0 <5.0 <5.0 <5.0 GP-44, 10' A 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 220 42 <5.0 <5.0 <5.0 GP-44, 15' A 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 22 <5.0 <5.0 <5.0 <5.0 GP-45, 1.5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-46, 1.5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 52 25 <5.0 <5.0 <5.0

GP-47, 1.5' VZ 8/18/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-48, 2.5' VZ 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-48, 20' B 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 18 <5.0 <5.0 <5.0 GP-49, 1.5' VZ 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-49, 10' A 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 10 83 24 <5.0 <5.0 GP-50, 18' B 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 37 <5.0 <5.0 <5.0 GP-51, 2.5' VZ 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-51, 15' A 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-52, 2.5' VZ 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-52, 7.5' A 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 92 110 44 <5.0 15 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 10 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-52, 15' A 8/19/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 180 190 25 <5.0 <5.0 GP-53, 2.5' VZ 8/24/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-53, 24.5' B 8/24/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-1, 6.5' A 8/21/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-1, 11' A 8/21/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-1, 28' B 8/21/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 340 <5.0 <5.0 <5.0 <5.0 LMW-4, 15' A 8/24/98 <25 <25 <25 <25 <25 <25 <50 <25 <25 <50 <25 2,200 280 <25 <25 <25 LMW-4, 25' B 8/24/98 <10 <10 <10 <10 <10 <10 <20 <10 <10 <20 <10 48 160 <10 <10 <10 MW-15, 2' VZ 8/20/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10.0 <5.0 <5.0 <10.0 <5.0 91 <5.0 <5.0 <5.0 <5.0 MW-16, 2.5' VZ 8/24/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-16, 8' A 8/24/98 <25 <26 <27 <25 <25 <25 <50 <25 <25 <50 <25 <25 350 49 <25 <25 MW-18, 3' VZ 8/20/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 9.0 140 <5.0 <5.0 <5.0 <5.0 MW-18, 9' A 8/20/98 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <10 250 4,100 320 <5.0 <5.0 34 CPT-20, 4' VZ 11/12/99 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-20, 20' B 11/12/99 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-21, 4' VZ 11/12/99 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-21, 20' B 11/12/99 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-2, 3' VZ 6/18/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-2, 7' A 6/18/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 TP-2, 24' B 6/18/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-3, 7' A 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-3, 15' A 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-3, 30' LB 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-4, 7' A 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-4, 15' A 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-4, 33' LB 6/19/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-5, 6' A 6/21/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-5, 15' A 6/21/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 TP-5, 30' LB 6/21/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 17 <5.0 <5.0 <5.0 <5.0 TP-6, 7' A 6/20/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 36 54 7.1 <5.0 <5.0 TP-6, 10' A 6/20/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 88 100 14 <5.0 <5.0 TP-6, 15' A 6/20/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 18 24 <5.0 <5.0 <5.0 TP-7, 7' A 6/21/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.0 54 <5.0 <5.0 <5.0 TP-7, 10' A 6/21/01 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.6 72 11 <5.0 <5.0 FS-A1, 15' A 1/29/02 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 FS-A1, 21' B 1/29/02 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 FS-A1, 26' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.8 <5.0 <5.0 <5.0 <5.0 FS-A1, 30' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 11 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) FS-A2, 10' A 1/23/02 5.1 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24 33 <5.0 <5.0 <5.0 FS-A2, 16.5' B 1/23/02 <5.0 <5.1 <5.2 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 57 7.2 <5.0 <5.0 <5.0 FS-A2, 20' B 1/23/02 <21 <22 <23 <21 <21 <21 <21 <21 <21 <21 <21 70 <21 <21 <21 <21 FS-A2, 34' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 <5.0 FS-A3, 10' A 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 35 <5.0 <5.0 <5.0 <5.0 FS-A3, 15' A 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 <5.0 <5.0 <5.0 <5.0 FS-A3, 20' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A3, 26' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A3, 34' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A4, 10' A 1/23/02 <20 <21 <22 <20 <20 <20 <20 <20 <20 <20 <20 150 27 <20 <20 <20 FS-A4, 15' A 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 170 <5.0 <5.0 <5.0 <5.0 FS-A4, 21' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 68 46 <5.0 <5.0 <5.0 FS-A4, 25.5' B 1/23/02 <250 <251 <252 <250 <250 <2500 <500 <250 <250 <500 <250 <250 950 <250 <250 <250 FS-A4, 28.5' B 1/23/02 <5.0 <5.1 <5.2 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 130 85 <5.0 <5.0 <5.0 FS-A4, 31.5' B 1/23/02 <250 <250 <250 <250 <250 <2500 <500 <250 <250 <500 <250 440 <250 <250 <250 <250 FS-A4, 34' B 1/23/02 <250 <250 <250 <250 <250 <2500 <500 <250 <250 <500 <250 19,000 <250 <250 <250 <250 FS-A5, 10' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A5, 20.5' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A5, 25' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A5, 34' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A6, 5.5' VZ 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 100 9.1 <5.0 <5.0 <5.0 FS-A6, 10' A 1/23/02 <250 <251 <252 <250 <250 <2500 <500 <250 <250 <500 <250 1,300 270 <250 <250 <250 FS-A6, 15.5' A 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24 <5.0 <5.0 <5.0 <5.0 FS-A6, 25.5' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A6, 34' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A7, 15' A 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 67 <5.0 <5.0 <5.0 <5.0 FS-A7, 21' B 1/23/02 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 290 <21 <21 <21 <21 FS-A7, 30.5 B 1/23/02 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 280 <21 <21 <21 <21 FS-A7, 34' B 1/23/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 81 <5.0 <5.0 <5.0 <5.0 FS-A8, 5.5' VZ 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A8, 10' A 1/25/02 <25 <26 <27 <25 <25 <25 <25 <25 <25 <25 <25 30 <25 <25 <25 <25 FS-A8, 15' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 110 12 <5.0 <5.0 <5.0 FS-A8, 25.5' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.5 <5.0 <5.0 <5.0 <5.0 FS-A8, 30.5' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A9, 10' A 1/29/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 31 <23 <23 <23 <23 FS-A9, 21' B 1/29/02 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 2,000 <250 <250 <250 <250 FS-A9, 25' B 1/29/02 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 8,000 <250 <250 <250 <250 FS-A9, 31' B 1/29/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 170 <25 <25 <25 <25 FS-A9, 34' B 1/29/02 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 88 <21 <21 <21 <21 FS-A10, 10' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 58 9.2 <5.0 <5.0 <5.0 FS-A10, 15' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 62 6.6 <5.0 <5.0 <5.0 FS-A10, 20.5' B 1/28/02 <24 <25 <26 <24 <24 <24 <24 <24 <24 <24 <24 330 52 <24 <24 <24 FS-A10, 30.5' B 1/28/02 <5.0 <5.1 <5.2 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.4 <5.0 <5.0 <5.0 <5.0 FS-A11, 10' A 1/29/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 950 <25 <25 <25 <25 FS-A11, 15' A 1/29/02 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 870 <250 <250 <250 <250 FS-A11, 20' B 1/29/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 190 <23 <23 <23 <23 FS-A11, 25' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.6 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 12 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) FS-A11, 30' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-A11, 34' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B1, 10' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 21 <5.0 <5.0 <5.0 <5.0 FS-B1, 15' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.4 <5.0 <5.0 <5.0 <5.0 FS-B1, 20' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B1, 25' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B1, 31' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B2, 15' A 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 21 13 <5.0 <5.0 <5.0 FS-B2, 26' B 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B2, 35' B 1/17/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 FS-B3, 10' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 7.3 <5.0 <5.0 <5.0 FS-B3, 20' B 1/18/02 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 <21 190 58 <21 <21 <21 FS-B3, 25' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 <5.0 <5.0 <5.0 FS-B3, 34.5' B 1/18/02 <11 <11 <11 <11 <11 <11 <11 <11 <11 <11 <11 58 <11 <11 <11 <11 FS-B4, 11' A 1/17/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 42 <25 <25 <25 FS-B4, 15' A 1/17/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 160 <25 <25 <25 FS-B4, 20' B 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 41 <5.0 <5.0 <5.0 FS-B5, 10' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 64 13 <5.0 <5.0 <5.0 FS-B5, 20' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B5, 30' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B5, 34' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B6, 10' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B6, 20.5' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.6 <5.0 <5.0 <5.0 <5.0 FS-B6, 26' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B6, 30.5' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-B6, 34' B 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C1, 15' A 1/17/02 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 170 94 <24 <24 <24 FS-C1, 20' B 1/17/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 36 <25 <25 <25 FS-C1, 25' B 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 79 <5.0 <5.0 <5.0 FS-C1, 30' B 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C2, 5' VZ 1/21/02 <29 <30 <31 <29 <29 <29 <29 <29 <29 <29 <29 75 63 50 <29 <29 FS-C2, 10' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 77 31 6.1 <5.0 <5.0 FS-C2, 15' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.5 5.8 <5.0 <5.0 FS-C2, 25' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C3, 7.5' A 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C3, 10.5' A 1/17/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 44 74 <5.0 <5.0 <5.0 FS-C3, 20' B 1/17/02 <19 <19 <19 <19 <19 <19 <19 <19 <19 <19 <19 460 35 <19 <19 <19 FS-C3, 25' B 1/17/02 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 640 <250 <250 <250 <250 FS-C3, 34.5' B 1/17/02 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 550 <250 <250 <250 <250 FS-C4, 5' VZ 1/18/02 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 160 110 <24 <24 <24 FS-C4, 10' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 190 <5.0 <5.0 13 FS-C4, 15' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 59 <5.0 <5.0 <5.0 FS-C4, 20' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 140 <5.0 <5.0 <5.0 <5.0 FS-C4, 25' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C4, 34' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 13 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) FS-C5, 5' VZ 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 93 98 12 <5.0 <5.0 FS-C5, 10' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 58 <5.0 <5.0 <5.0 FS-C5, 15' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24 <5.0 <5.0 <5.0 FS-C5, 20' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C6, 5' VZ 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 60 61 7.1 <5.0 <5.0 FS-C6, 10' A 1/18/02 <13 <14 <15 <13 <13 <13 <13 <13 <13 <13 <13 29 99 <13 <13 <13 FS-C6, 20' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 FS-C7, 8' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 18 5.0 <5.0 <5.0 FS-C7, 15' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.3 <5.0 <5.0 <5.0 FS-C7, 20.5' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C7, 30' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C7, 34' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C8, 10' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 18 9.1 <5.0 <5.0 FS-C8, 15' A 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 23 16 <5.0 <5.0 FS-C8, 20' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C8, 30' B 1/18/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C9, 10' A 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.0 5.1 <5.0 <5.0 FS-C9, 15' A 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C9, 20' B 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C9, 34' B 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C10, 5' VZ 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 30 56 11 <5.0 <5.0 FS-C10, 15' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 FS-C10, 20' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C10, 26' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 6.2 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C10, 30' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C11, 5' VZ 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C11, 10' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 21 <5.0 <5.0 FS-C11, 15' A 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C11, 25' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C12, 9' A 1/21/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 82 <23 <23 <23 FS-C12, 15' A 1/21/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 44 <25 <25 <25 FS-C12, 20' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C12, 25' B 1/21/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C13, 5' VZ 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C13, 10' A 1/22/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 170 120 <23 <23 <23 FS-C14, 5' VZ 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C14, 10' A 1/24/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C15, 10' A 1/22/02 <16 <16 <16 <16 <16 19 <16 <16 <16 <16 <16 85 620 130 <16 21 FS-C15, 15' A 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 20 <5.0 8.8 FS-C15, 21' B 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.6 <5.0 <5.0 <5.0 FS-C15, 26' B 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C16, 5' VZ 1/25/02 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 <250 FS-C16, 10' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C16, 15' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C16, 25.5' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 14 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) FS-C17, 5' VZ 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 52 7.8 <5.0 <5.0 FS-C17, 10' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 19 <5.0 <5.0 <5.0 FS-C18, 10' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 72 74 9.4 <5.0 <5.0 FS-C18, 18' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 18 98 7.3 <5.0 <5.0 FS-C18, 30.5' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C19, 10' A 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 45 5.1 <5.0 <5.0 <5.0 FS-C19, 15' A 1/22/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 40 66 11 <5.0 <5.0 FS-C20, 5' VZ 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 21 12 <5.0 <5.0 <5.0 FS-C20, 10' A 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 FS-C20, 20' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C20, 34' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C21, 5' VZ 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 20 <5.0 <5.0 <5.0 <5.0 FS-C21, 15' A 1/29/02 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 480 <22 <22 <22 FS-C21, 20.5' B 1/29/02 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 <22 92 <22 <22 <22 FS-C21, 25.5' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-C21, 34' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D1, 15.5-16' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.1 <5.0 <5.0 <5.0 FS-D1, 20.5-21' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D1, 25.5-26' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D1, 34-34.5' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D2, 10' A 1/29/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 34 <23 <23 <23 <23 FS-D2, 15' A 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D2, 29' B 1/29/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 <5.0 FS-D2, 34' B 1/29/02 <19 <19 <19 <19 <19 <19 <19 <19 <19 <19 <19 87 <19 <19 <19 <19 FS-D3, 5' VZ 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.5 <5.0 <5.0 <5.0 FS-D3, 15' A 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D3, 25' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D3, 34' B 1/25/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D4, 10' A 1/28/02 <24 <25 <26 <24 <24 <24 <24 <24 <24 <24 <24 47 <24 <24 <24 <24 FS-D4-15' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 41 <5.0 <5.0 <5.0 <5.0 FS-D4, 20' B 1/28/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 490 <23 <23 <23 <23 FS-D4, 25.5' B 1/28/02 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 240 <24 <24 <24 <24 FS-D4, 34' B 1/28/02 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 <23 280 <23 <23 <23 <23 FS-D5, 6.5' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 94 6.0 <5.0 <5.0 <5.0 FS-D5, 15' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 28 <5.0 <5.0 <5.0 <5.0 FS-D5,20.5' B 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 54 <5.0 <5.0 <5.0 <5.0 FS-D5, 25.5' B 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D6, 5' VZ 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D6, 10' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D7, 5' VZ 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D7, 10' A 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FS-D8, 5.5' VZ 1/28/02 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 37 <25 <25 <25 <25 FS-D8, 10' A 1/28/02 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 <24 110 25 <24 <24 <24 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 15 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) FS-D8, 20.5' B 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 89 5.0 <5.0 <5.0 <5.0 FS-D8, 34' B 1/28/02 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 <5.0 <5.0 <5.0 <5.0 CPT-24, 16.5-17' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 18 <5.0 <5.0 <5.0 <5.0 CPT-24, 26.5-27' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 28 <5.0 <5.0 <5.0 <5.0 CPT-25, 4.5-5' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.4 <5.0 <5.0 <5.0 <5.0 CPT-25, 15-15.5' B 5/19/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 570 <250 <250 <250 <250 CPT-26, 29-29.5' B 5/19/03 <2,500 <2,500 <2,500 <2,500 <2,500 <25,000 <5,000 <2,500 <2,500 <5,000 <2,500 13,000 <2,500 <2,500 <2,500 <2,500 CPT-27, 5-5.5' A 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 CPT-27, 16-16.5' B 5/19/03 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 28 <25 <25 <25 <25 CPT-30, 5-5.5' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 45 5.1 <5.0 <5.0 <5.0 CPT-30, 27.5-28' 1 B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-31, 16-16.5' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-31, 32.5-33' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-32, 5.5-6' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 43 9.4 <5.0 <5.0 <5.0 CPT-32, 16.5-17' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 6.1 7.3 <5.0 <5.0 <5.0 CPT-33, 5.5-6' VZ 5/16/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 99 28 <5.0 <5.0 <5.0 CPT-33, 21-21.5' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 <5.0 CPT-33, 31.5-32' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-34, 20.5-21' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 950 <250 <250 <250 <250 CPT-35, 15-15.5' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-35, 33.5-34' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 52 <5.0 <5.0 <5.0 <5.0 CPT-36, 16-16.5' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-36, 30-30.5' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 18 <5.0 <5.0 <5.0 <5.0 CPT-37, 15.5-16' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-37, 30.5-31' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-38, 16-16.5' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-38, 29.5-30' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-39, 15-15.5' B 5/16/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 19 <5.0 <5.0 <5.0 <5.0 CPT-40, 5-5.5' VZ 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-40, 24-24.5' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 2,100 <250 <250 <250 <250 CPT-40, 30.5-31' 1 B 5/20/03 <250 <250 <250 <250 <250 <2,500 <250 <250 <250 <250 <250 1,400 <250 <250 <250 <250 CPT-42, 18.5-19' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 CPT-42, 29.5-30' B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-54, 5-5.5' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 25 <5.0 <5.0 <5.0 GP-54, 9-9.5' A 5/19/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 1,300 <250 <250 <250 <250 GP-54, 14.5-15' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 54 9.2 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 16 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-54, 24-24.5' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 6.4 <5.0 <5.0 <5.0 <5.0 GP-54, 37-37.5' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-55, 4.5-5' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 <5.0 <5.0 <5.0 <5.0 GP-55, 7-7.5' 1 A 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 140 17 <5.0 <5.0 <5.0 GP-55, 24.5-25' B 5/19/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 36,000 520 <250 <250 <250 GP-55, 33.5-34' B 5/19/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 2,700 <250 <250 <250 <250 GP-55, 39.5-40' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <10 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-56, 4.5-5' VZ 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-56, 8-8.5' A 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 12 19 <5.0 <5.0 <5.0 GP-56, 17-17.5' 1 B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 <5.0 <5.0 GP-56, 24.5-25' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-56, 39.5-40' B 5/19/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP57A, 5.5-6' VZ 5/22/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 65 31 <5.0 <5.0 <5.0 GP57A, 19.5-20' B 5/22/03 <250 <250 <250 <250 <250 <2,500 <250 <250 <250 <250 <250 470 <250 <250 <250 <250 GP57A, 23.5-24' B 5/22/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 16 <5.0 <5.0 <5.0 <5.0 GP57A, 34.5-35' B 5/22/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-58A, 5-5.5' VZ 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 28 29 <5.0 <5.0 <5.0 GP-58A, 9.5-10' A 5/23/03 <19 <19 <19 <19 <19 <38 <19 <19 <19 <19 <19 510 120 <19 <19 <19 GP-58A, 14.5-15' B 5/23/03 <250 <250 <250 <250 <250 <2,500 <250 <250 <250 <250 <250 280 <250 <250 <250 <250 GP-58A, 19.5-20' B 5/23/03 <250 <250 <250 <250 <250 <2,500 <250 <250 <250 <250 <250 970 <250 <250 <250 <250 GP-58A, 25-25.5' B 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 120 <5.0 <5.0 <5.0 <5.0 GP-58A, 39.5-40' B 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-59, 4.5-5' VZ 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-59, 16.5-17' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 360 <250 <250 <250 <250 GP-59, 20-20.5' 1 B 5/20/03 <250 <250 <250 <250 <250 <2,500 <250 <250 <250 <250 <250 8,200 <250 <250 <250 <250 GP-59, 25.5-26' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 1,600 <250 <250 <250 <250 GP-59, 34-34.5' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 1,300 <250 <250 <250 <250 GP-59, 39.5-40' 1 B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.4 <5.0 <5.0 <5.0 <5.0 GP-60, 5-5.5' VZ 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-60, 14.5-15' A 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 170 <5.0 <5.0 <5.0 <5.0 GP-60, 19.5-20' 1 B 5/20/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 41 <5.0 <5.0 <5.0 <5.0 GP-60, 25-25.5' B 5/20/03 <25 <25 <25 <25 <25 <25 <120 <25 <25 <25 <25 <25 110 <25 <25 <25 GP-60, 34.5-35' B 5/20/03 <250 <250 <250 <250 <250 <2,500 <500 <250 <250 <500 <250 1,300 <250 <250 <250 <250 GP-61A, 5-5.5' VZ 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 42 <5.0 <5.0 <5.0 <5.0 GP-61A, 14.5-15' A 5/23/03 <23 <23 <23 <23 <23 <46 <23 <23 <23 <23 <23 290 32 <23 <23 <23 GP-61A, 24.5-25' B 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 91 13 <5.0 <5.0 <5.0 GP-61A, 34.5-35' B 5/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <10 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 PZ-2, 4.5-5' VZ 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 PZ-2, 9-9.5' A 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 84 98 21 <5.0 5.8 LMW-5, 2.5-3' VZ 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-5, 12.5-13' A 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 52 240 33 <5.0 <5.0 LMW-5, 19.5-20' B 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 <5.0 <5.0 <5.0 LMW-5, 23.5-24' B 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 17 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) LMW-5, 34.5-35' B 6/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-6, 7-7.5' A 6/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 44 10 <5.0 <5.0 <5.0 LMW-6, 16-16.5' B 6/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.0 <5.0 <5.0 <5.0 <5.0 LMW-6, 21-21.5' B 6/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 33 9.0 <5.0 <5.0 <5.0 LMW-6, 23.5-24' B 6/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,700 <5.0 <5.0 <5.0 <5.0 RW-1, 16.5-17' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.5 26,000 66 <5.0 <5.0 <5.0 RW-1, 19.5-20' B 7/25/03 <1,000 <25 <25 <25 <25 <25 <25 <25 <25 <25 360 600,000 140 <25 <25 <25 RW-1, 23-23.5' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 21 42,000 48 <5.0 <5.0 <5.0 RW-2, 6-6.5' A 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 16 <5.0 <5.0 <5.0 <5.0 RW-2, 26.5-27' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.1 7,700 12 <5.0 <5.0 <5.0 RW-2, 33-33.5' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.0 4,300 <5.0 <5.0 <5.0 <5.0 RW-2, 34.5-35' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.4 9,800 <5.0 <5.0 <5.0 <5.0 RW-3, 15.5-16' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,400 8.3 <5.0 <5.0 <5.0 RW-3, 19.5-20' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 4,900 11 <5.0 <5.0 <5.0 RW-3, 23.5-24' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,300 8.9 <5.0 <5.0 <5.0 RW-4, 27.5-28' B 7/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 19,000 6.9 <5.0 <5.0 <5.0 RW-4, 31.5-32' B 7/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 25 9,800 8.5 <5.0 <5.0 <5.0 RW-4, 34.75-35' B 7/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5,000 28 <5.0 <5.0 <5.0 RW-4, 37.5-38' B 7/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 400 <5.0 <5.0 <5.0 <5.0 RW-5, 23.5-24' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 920 120 <5.0 <5.0 14 RW-5, 30.5-31' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 1,500 12 <5.0 <5.0 <5.0 RW-6, 23.5-24' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,600 180 <5.0 <5.0 32 RW-6, 27.5-28' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 14 <5.0 <5.0 <5.0 RW-6, 29.5-30' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24 4,600 170 <5.0 <5.0 10 RW-7, 23-23.5' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 98 62 <5.0 <5.0 12 RW-7, 27.5-28' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 41 <5.0 <5.0 14 RW-7, 31-31.5' B 7/21/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 25 <5.0 <5.0 <5.0 <5.0 RW-8, 19.5-20' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 880 68 <5.0 <5.0 <5.0 RW-8, 24.5-25' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 600 360 <5.0 <5.0 <5.0 RW-8, 29.5-30' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 <5.0 <5.0 <5.0 <5.0 RW-9, 13.5-14' A 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 32 <5.0 <5.0 <5.0 RW-9, 19.5-20' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 450 180 <5.0 <5.0 <5.0 RW-9, 24-24.5' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 130 <5.0 <5.0 <5.0 RW-9, 29.5-30' B 7/31/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 93 130 <5.0 <5.0 <5.0 LPZ-2, 21.5-22' B 7/22/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 400 <5.0 <5.0 <5.0 <5.0 LPZ-3, 19.5-20' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.2 72,000 100 <5.0 <5.0 <5.0 LPZ-3, 23.5-24' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24,000 110 <5.0 <5.0 <5.0 LPZ-3, 27.5-28' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7,700 <5.0 <5.0 <5.0 <5.0 LPZ-3, 31.5-32' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6,000 <5.0 <5.0 <5.0 <5.0 LPZ-4, 19.5-20' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.2 4,900 18 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 18 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) LPZ-4, 23.5-24' B 7/23/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7,500 7.3 <5.0 <5.0 <5.0 LPZ-5, 16.5-17' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.6 7,600 140 <5.0 <5.0 <5.0 LPZ-5, 29.5-30' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 22 24,000 26 <5.0 <5.0 <5.0 LPZ-5, 34.5-35' B 7/25/03 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 68,000 5.4 <5.0 <5.0 <5.0 GP-65, 9.5-10' A 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 250 47 <5.0 <5.0 <5.0 GP-65, 19.5-20' B 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 24 30 <5.0 <5.0 <5.0 GP-65, 21.5-22' B 2/15/05 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 96 9,500 180 <25 <25 <25 GP-65, 33-33.5' B 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 420 24 <5.0 <5.0 <5.0 GP-66, 5-5.5' VZ 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.4 <5.0 <5.0 <5.0 <5.0 GP-66, 14-14.5' A 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 47 42 <5.0 <5.0 <5.0 GP-66, 21-21.5' B 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 23 5.0 <5.0 <5.0 <5.0 GP-66, 29.5-30' B 2/15/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 85 <5.0 <5.0 <5.0 <5.0 GP-67, 9.5-10' A 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 46 <5.0 <5.0 <5.0 GP-67, 17.5-18' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 18 <5.0 <5.0 <5.0 GP-67, 19.5-20' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 1,200 78 <5.0 <5.0 <5.0 GP-67, 34.5-35' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 48 24,000 <5.0 <5.0 <5.0 <5.0 GP-68, 17-17.5' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 60 20 <5.0 <5.0 <5.0 GP-68, 19.5-20' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.9 830 140 7.9 <5.0 <5.0 GP-68, 24.5-25' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9.4 1,600 11 <5.0 <5.0 <5.0 GP-68, 29.5-30' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.9 800 <5.0 <5.0 <5.0 <5.0 GP-68, 34.5-35' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 440 <5.0 <5.0 <5.0 <5.0 GP-69, 19.5-20' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 140 15 <5.0 <5.0 <5.0 GP-69, 22.5-23' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 33 <5.0 <5.0 <5.0 <5.0 GP-69, 29.5-30' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-69, 34.5-35' B 5/17/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 RW-10, 6-6.5' A 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 450 56 <5.0 <5.0 <5.0 RW-10, 11-11.5' A 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 91 26 <5.0 <5.0 <5.0 RW-10, 16-16.5' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 84 22 <5.0 <5.0 <5.0 RW-10, 21-21.5' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 240 19 <5.0 <5.0 <5.0 RW-10, 26-26.5' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 190 9.8 <5.0 <5.0 <5.0 RW-10, 29.5-30' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 33 <5.0 <5.0 <5.0 <5.0 RW-11, 16-16.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 6.0 <5.0 <5.0 <5.0 RW-11, 26-26.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 480 58 <5.0 <5.0 <5.0 RW-11, 31-31.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.8 180 8.9 <5.0 <5.0 <5.0 RW-12, 11-11.5' A 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.3 1,100 74 7.9 <5.0 <5.0 RW-12, 16-16.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.1 580 21 <5.0 <5.0 <5.0 RW-12, 21-21.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.4 2,700 44 <5.0 <5.0 <5.0 RW-12, 31-31.5' B 5/18/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.4 1,400 10 <5.0 <5.0 <5.0 RW-13, 16-16.5' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 260 88 6.5 <5.0 5.5 RW-13, 21-21.5' B 5/19/05 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 52 43,000 37 <25 <25 <25 RW-13, 24.5-25' B 5/19/05 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 190 70,000 <25 <25 <25 <25 RW-13, 26-26.5' B 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 23 6,700 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 19 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) MW-19, 5.5-6' VZ 5/20/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 19 <5.0 <5.0 <5.0 <5.0 MW-19,12.5-13' A 5/19/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,400 <5.0 <5.0 <5.0 <5.0 DW-1, 14-14.5' A 5/23/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 88 <5.0 <5.0 <5.0 <5.0 DW-1, 24-24.5' B 5/23/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,100 8.5 <5.0 <5.0 <5.0 DW-1, 30-30.5' B 5/23/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 19,000 5.3 <5.0 <5.0 <5.0 DW-1, 34-34.5' B 5/23/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 3,000 <5.0 <5.0 <5.0 <5.0 DW-2, 6.5-7' A 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 61 <5.0 <5.0 <5.0 <5.0 DW-2, 13.5-14' A 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 180 <5.0 <5.0 <5.0 <5.0 DW-2, 18-18.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.1 24,000 140 <5.0 <5.0 <5.0 DW-2, 22.5-23' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 28,000 13 <5.0 <5.0 <5.0 DW-2, 25.5-26' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 36,000 10 <5.0 <5.0 <5.0 DW-2, 30-30.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 70 50,000 17 <5.0 <5.0 <5.0 DW-2, 35-35.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 49,000 <5.0 <5.0 <5.0 <5.0 DW-3, 11.5-12' A 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 770 <5.0 <5.0 <5.0 <5.0 DW-3, 16.5-17' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11,000 22 <5.0 <5.0 <5.0 DW-3, 23-23.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7,400 11 <5.0 <5.0 <5.0 DW-3, 27-27.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 27,000 <5.0 <5.0 <5.0 <5.0 DW-3, 30-30.5' B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 110 110,000 <5.0 <5.0 <5.0 <5.0 DW-3, 35-35.5 B 6/21/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 41 58,000 10 <5.0 <5.0 <5.0 GP-70, 10-10.5' A 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 700 54 <5.0 <5.0 <5.0 GP-70, 20-20.5' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 220 83 <5.0 <5.0 <5.0 GP-70, 25-25.5' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 510 22 <5.0 <5.0 <5.0 GP-70, 29.5-30' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,700 7.8 <5.0 <5.0 <5.0 GP-70, 30-30.5' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 340 <5.0 <5.0 <5.0 <5.0 GP-70, 34.5-35' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 90 <5.0 <5.0 <5.0 <5.0 GP-71, 10-10.5' A 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 310 33 <5.0 <5.0 <5.0 GP-71, 14-14.5' A 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 88 44 <5.0 <5.0 <5.0 GP-71, 20-20.5' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 650 60 <5.0 <5.0 <5.0 GP-71, 25-25.5' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 890 36 <5.0 <5.0 <5.0 GP-71, 29.5-30' B 9/8/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.1 4,200 69 <5.0 <5.0 <5.0 GP-72, 8-8.5' A 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 210 27 <5.0 <5.0 <5.0 GP-72, 10-10.5' A 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 46 <5.0 <5.0 <5.0 GP-72, 14-14.5' A 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 42 82 <5.0 <5.0 <5.0 GP-72, 20-20.5' B 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 680 59 <5.0 <5.0 <5.0 GP-72, 23.5-24' B 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 340 82 <5.0 <5.0 <5.0 GP-72, 25-25.5' B 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 47 <5.0 <5.0 <5.0 GP-72, 29.5-30' B 9/9/05 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 550 5.6 <5.0 <5.0 <5.0 GP-73, 19.5-20' B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 21,000 150 <5.0 <5.0 <5.0 GP-73, 23.5-24' B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 22 51,000 69 <5.0 <5.0 <5.0 GP-73, 27.5-28' B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 32 36,000 140 <5.0 <5.0 <5.0 GP-73, 34.5-35' B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 9,500 8.1 <5.0 <5.0 <5.0 GP-74, 7.5-8' A 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-74, 23.5-24' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 93 <5.0 <5.0 <5.0 <5.0 GP-74, 31.5-32' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,600 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 20 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-74, 35.5-36' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 22 <5.0 <5.0 <5.0 <5.0 GP-75, 7.5-8' A 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 42 <5.0 <5.0 <5.0 <5.0 GP-75, 21.5-22' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-75, 31.5-32' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.6 <5.0 <5.0 <5.0 <5.0 GP-75, 34.5-35' B 3/6/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11,000 <5.0 <5.0 <5.0 <5.0 GP-76, 9.5-10' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 480 98 <5.0 <5.0 <5.0 GP 76, 17.5-18' B 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 36 99 <5.0 <5.0 <5.0 GP 76, 27.5-28' B 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 20 <5.0 <5.0 <5.0 <5.0 GP 76, 32-32.5' B 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 37 <5.0 <5.0 <5.0 <5.0 GP 76, 34.5-35' B 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 54 <5.0 <5.0 <5.0 <5.0 GP-77, 7.5-8' A 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 160 72 <5.0 <5.0 11 GP-77, 11.5-12' A 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.6 24 <5.0 <5.0 <5.0 GP-77, 23.5-24' 2 B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 <5.0 9.5 15,000 1,900 20 21 130 GP-77, 27.5-28' 2 B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 16 39,000 830 <5.0 13 140 GP-77, 34.5-35' B 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,500 <5.0 <5.0 <5.0 <5.0 GP-78, 7.5-8' A 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 <5.0 <5.0 <5.0 <5.0 GP-78, 11.5-12' A 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 110 1,300 100 <5.0 <5.0 16 GP-78, 15.5-16' UB 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 66 1,400 120 <5.0 <5.0 10 GP-78, 19.5-20' UB 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 16 510 120 <5.0 <5.0 9.6 GP-78, 23.5-24' UB 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.5 <5.0 <5.0 <5.0 <5.0 GP-78, 27.5-28' UB 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 27 <5.0 <5.0 <5.0 <5.0 GP-78, 34.5-35' LB 3/7/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-79, 7.5-8' A 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 17 350 10 <5.0 <5.0 <5.0 GP-79, 15.5-16' UB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 83 4,600 100 <5.0 <5.0 5.7 GP-79, 19.5-20' UB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.9 1,600 44 <5.0 <5.0 <5.0 GP-79, 23.5-24' UB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-79, 27.5-28' LB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-80, 9.5-10' A 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 26 <5.0 <5.0 <5.0 <5.0 GP-80, 15.5-16' UB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 43 20 <5.0 <5.0 <5.0 GP-81, 7.5-8' A 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 23 9.1 <5.0 <5.0 <5.0 GP-81, 11.5-12' A 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 <5.0 GP-81, 15.5-16' UB 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 90 28 <5.0 <5.0 <5.0 GP-81, 19.5-20' UB 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 260 83 12 <5.0 <5.0 GP-82, 7.5-8' A 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.3 62 11 <5.0 <5.0 GP-82, 15.5-16' UB 3/9/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.9 <5.0 <5.0 <5.0 GP-83, 7.5-8' A 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-83, 11.5-12' A 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-83, 15.5-16' UB 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 20 30 5.1 <5.0 <5.0 GP-83, 19.5-20' UB 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 61 47 6.3 <5.0 <5.0 GP-83, 23.5-24' UB 3/8/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-84, 3.5-4' VZ 4/24/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 16 <5.0 <5.0 <5.0 <5.0 GP-84, 7-7.5' A 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 24 5.5 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 21 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) GP-84, 12-12.5' A 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 2,800 290 <5.0 <5.0 22 GP-84, 19.5-20' UB 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 35 1,400 110 6.8 <5.0 6.1 GP-85, 3-3.5' VZ 4/24/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 55 <5.0 <5.0 <5.0 <5.0 GP-85, 5-5.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 <5.0 <5.0 <5.0 <5.0 GP-85, 14.5-15' A 4/25/06 270 <25 <25 <25 <25 <25 <25 <25 <25 <25 410 13,000 160 <25 <25 <25 GP-85, 19.5-20' UB 4/25/06 280 <25 <25 <25 <25 <25 <25 <25 <25 <25 340 11,000 140 <25 <25 <25 GP-86, 3-3.5' VZ 4/24/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.9 180 <5.0 <5.0 <5.0 <5.0 GP-86, 5-5.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 20 <5.0 <5.0 <5.0 <5.0 GP-86, 14.5-15' A 4/25/06 270 <25 <25 <25 <25 <25 <25 <25 <25 <25 420 11,000 250 <25 <25 <25 GP-86, 19.5-20' UB 4/25/06 300 <25 <25 <25 <25 <25 <25 <25 <25 <25 240 7,100 160 <25 <25 <25 GP-87, 3-3.5' VZ 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-87, 9.5-10' A 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,000 13,000 300 <5.0 <5.0 11 GP-87, 14.5-15' A 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 660 10,000 240 <5.0 <5.0 10 GP-87, 17-17.5' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 610 23,000 240 5.0 <5.0 <5.0 GP-87, 19.5-20' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 280 10,000 96 <5.0 <5.0 <5.0 GP-87, 22-22.5' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.0 540 19 <5.0 <5.0 <5.0 GP-87, 24.5-25' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 <5.0 <5.0 GP-88, 3-3.5' VZ 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 GP-88, 9.5-10' A 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 21 <5.0 <5.0 GP-90, 9.5-10' A 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 140 34 <5.0 <5.0 GP-90, 19.5-20' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 60 35 <5.0 <5.0 <5.0 GP-90, 24.5-25' UB 7/12/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 38 320 <5.0 <5.0 <5.0 SH-1, 3-3.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 SH-2, 3-3.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 SH-3, 3-3.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.3 <5.0 <5.0 <5.0 <5.0 SH-4, 3-3.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 33 <5.0 <5.0 <5.0 <5.0 SH-5, 3-3.5' VZ 4/25/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 69 <5.0 <5.0 <5.0 <5.0 LB-1, 29.5-30' B 3/14/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 160 <5.0 <5.0 <5.0 <5.0 LB-1, 34.5-35' B 3/14/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 540 <5.0 <5.0 <5.0 <5.0 LB-2, 27-27.5' B 3/14/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 21 <5.0 <5.0 <5.0 <5.0 LB-2, 28-28.5' B 3/14/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,700 <5.0 <5.0 <5.0 <5.0 LB-2, 34.0-34.5' B 3/14/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 160 <5.0 <5.0 <5.0 <5.0 UB-1, 19-19.5' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 750 <5.0 <5.0 <5.0 <5.0 UB-1, 24-24.5' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 200 <5.0 <5.0 <5.0 UB-2, 16-16.5' A/B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 45 <5.0 <5.0 <5.0 <5.0 UB-2, 19-19.5' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 88 <5.0 <5.0 <5.0 <5.0 UB-2, 24-24.5' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 11 14 <5.0 <5.0 <5.0 LMW-7, 19-19.5' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.8 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 22 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) LMW-7, 21.5-22' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.2 <5.0 <5.0 <5.0 LMW-7, 24.5-25' B 3/16/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-20, 9-9.5' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 100 23 <5.0 <5.0 MW-20, 14.5-15' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 5.5 <5.0 <5.0 MW-21, 7.5-8' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,100 28 <5.0 <5.0 MW-21, 10-10.5' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 96 340 19 <5.0 <5.0 MW-21, 14-14.5' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 240 53 <5.0 <5.0 MW-22, 6.5-7' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 7.4 <5.0 <5.0 <5.0 MW-22, 11.5-12' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 300 73 <5.0 <5.0 15 MW-22, 14.5-15' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 3,300 510 5.4 <5.0 8.9 MW-23, 6.5-7' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 400 94 <5.0 <5.0 <5.0 MW-23, 8.5-9' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 10 1,800 690 11 <5.0 <5.0 MW-23, 14.5-15' A 3/17/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,000 140 <5.0 <5.0 <5.0 MW-24, 8-8.5' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-24, 9-9.5' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-24, 14-14.5' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 6.3 <5.0 <5.0 <5.0 <5.0 MW-25, 8-8.5' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.0 <5.0 <5.0 <5.0 MW-25, 14.5-15' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 MW-26, 6.5-7' A 3/15/06 <5.0 0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 500 65 <5.0 <5.0 <5.0 MW-26, 8-8.5' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 380 61 <5.0 <5.0 <5.0 MW-26, 14.5-15' A 3/15/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 40 7.2 <5.0 <5.0 <5.0 MW-27, 9.5-10' A 8/10/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 800 4,800 200 5.3 <5.0 <5.0 MW-27, 14.5-15' A 8/10/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 520 6,000 180 <5.0 <5.0 <5.0 MW-27, 19.5-20' UB 8/10/06 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 53 1,400 86 <5.0 <5.0 <5.0 MW-28, 8.5-9 A 9/14/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 350 3,700 100 <5.0 <5.0 <5.0 MW-28, 14.5-15 A 9/14/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 230 4,400 110 <5.0 <5.0 <5.0 MW-29, 3-3.5 VZ 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 14 18 <5.0 <5.0 <5.0 MW-29, 10-10.5 A 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 320 43 <5.0 <5.0 <5.0 UB-3, 10-10.5 A 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 810 92 <5.0 <5.0 12 UB-3, 22-22.5 A 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,800 26 <5.0 <5.0 <5.0 UB-5 @15' B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 370 310 <5.0 <5.0 8.5 UB-5 @22' B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.3 <5.0 <5.0 580 440 <5.0 9.7 9.8 UB-5 @25' B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 13 <5.0 <5.0 1,100 780 7.7 28 22 UB-5 @29.5' B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,700 300 <5.0 <5.0 12 UB-6 @2.5' VZ 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 99 34 <5.0 <5.0 <5.0 LB-3, 3-3.5 VZ 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 190 40 <5.0 <5.0 <5.0 LB-3, 34.5-35 B 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,100 5.1 <5.0 <5.0 <5.0 LB-4, 3-3.5 VZ 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 93 7.8 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 23 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) LB-4, 10-10.5 A 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 130 17 <5.0 <5.0 <5.0 LB-4, 19.5-20 B 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 780 6.8 <5.0 <5.0 <5.0 LB-4, 30-30.5 B 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 460 78 <5.0 <5.0 18 LB-4, 34.5-35 B 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 360 <5.0 <5.0 <5.0 <5.0 LB-5, 5-5.5 A 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LB-5, 15-15.5 B 9/13/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 280 190 <5.0 <5.0 6.1 LB-6, 10.5-11 A 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 310 83 <5.0 <5.0 <5.0 LB-6, 15-15.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 34 48 <5.0 <5.0 5.0 LB-6, 20.5-21 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 100 340 <5.0 <5.0 <5.0 LB-6, 26-26.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 390 <5.0 <5.0 <5.0 <5.0 LB-6, 34.5-35 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 170 <5.0 <5.0 <5.0 <5.0 LMW-8 @2.5' VZ 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-8, 15-15.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 320 200 <5.0 <5.0 40 LMW-8, 20-20.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,200 730 <5.0 18 50 LMW-8, 25-25.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 590 960 <5.0 <5.0 <5.0 LMW-8, 30-30.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 620 620 <5.0 5.5 49 LMW-9, 2.5-3 VZ 9/14/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 52 <5.0 <5.0 <5.0 <5.0 LMW-9, 10-10.5 A 9/14/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 390 8,100 92 <5.0 <5.0 <5.0 LMW-9, 14-14.5 A 9/14/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 380 8,000 120 <5.0 <5.0 5.0 LMW-9, 19.5-20 UB 9/14/07 <50 <50 <50 <50 <50 <50 <50 <50 <50 <50 240 11,000 160 <50 <50 <50 LMW-10 @2.5' VZ 9/11/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 10 <5.0 560 190 7.3 <5.0 <5.0 LMW-10, 10.5-11 A 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-10 15.0-15.5 A 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 LMW-10, 21-21.5 B 9/12/07 <900 <900 <900 <900 <900 <900 <900 <900 <900 <900 4,300 430,000 26,000 <900 <900 <900 LMW-10, 26-26.5 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 8.2 890 36 <5.0 <5.0 <5.0 LMW-10, 30.5-31 B 9/12/07 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.1 580 58 <5.0 <5.0 <5.0 LMW-10, 34-34.5 B 9/12/07 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 28 8,800 430 <25 <25 <25 RP-DT1-1(s) 20' UB 10/8/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 300 230 <5.0 <5.0 180 RP-DT1-1(s) 28' UB 10/8/09 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 27,000 880 <25 <25 <25 FA-1, 2.5-3 VZ 7/11/08 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FUB-1, 5-5.5 A 7/11/08 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FUB-1, 10-10.5 A 7/11/08 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 FUB-1, 15-15.5 UB 7/11/08 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 150 690 120 <5.0 <5.0 <5.0 FUB-1, 19.5-20 UB 7/11/08 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 230 3,000 310 <5.0 <5.0 <5.0 F-2, 2 VZ 1/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 F-2, 9 A 1/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 70 13 <5.0 <5.0 <5.0 F-2, 14.5 A 1/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 160 44 <5.0 <5.0 <5.0 F-2, 19.5 UB 1/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-1-3' VZ 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-1-8.5' A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 17 <5.0 <5.0 <5.0 <5.0 Degreasing Tank No. 1
Railroad/Western Boundary
Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 24 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) UP-1-12' A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 120 1,500 240 6.8 <5.0 5.3 UP-1-17' UB 8/26/09 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 100 5,100 180 <25 <25 <25 UP-1-22' UB 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-2-3' VZ 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-2-7.5' A 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 44 <5.0 <5.0 <5.0 <5.0 UP-2-12' A 8/27/09 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 160 5,200 75 <25 <25 <25 UP-2-16.5' UB 8/27/09 <70 <70 <70 <70 <70 <70 <70 <70 <70 <70 490 19,000 220 <70 <70 <70 UP-2-22' UB 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 97 5.2 <5.0 <5.0 <5.0 UP-3-3' VZ 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.2 <5.0 <5.0 <5.0 <5.0 UP-3-7.5 A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-3-12' A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 110 3,300 120 <5.0 <5.0 <5.0 UP-3-17' UB 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <250 4,800 270 <5.0 <5.0 7.4 UP-3-22' UB 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 72 <5.0 <5.0 <5.0 <5.0 UP-4, 3 VZ 8/24/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-4-7.5 A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-4-12.5' A 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 430 82 <5.0 <5.0 <5.0 UP-4-17.5' UB 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7,500 <5.0 <5.0 <5.0 6.1 UP-4-22' UB 8/26/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 92 5.2 <5.0 <5.0 <5.0 UP-5, 3' VZ 8/24/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 UP-5, 8' A 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 12 <5.0 <5.0 <5.0 <5.0 UP-5, 12' A 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 29 9.4 <5.0 <5.0 <5.0 UP-5, 16.5' UB 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 180 5,700 380 8.6 <5.0 15 UP-5, 22' UB 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 78 <5.0 <5.0 <5.0 <5.0 UP-6, 3' VZ 8/24/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 15 <5.0 <5.0 <5.0 <5.0 UP-6, 7 A 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 17 <5.0 <5.0 <5.0 <5.0 UP-6, 12.5 A 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 10 440 34 <5.0 <5.0 <5.0 UP-6, 17 UB 8/25/09 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 590 21,000 210 <25 <25 <25 UP-6, 22 UB 8/25/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 59 <5.0 <5.0 <5.0 <5.0 UP-7, 3' VZ 8/24/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 20 <5.0 <5.0 <5.0 <5.0 UP-7-7.5' A 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 170 <5.0 <5.0 <5.0 <5.0 UP-7-12' A 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 94 16 <5.0 <5.0 <5.0 UP-7-17' UB 8/27/09 <25 <25 <25 <25 <25 <25 <25 <25 <25 <25 74 3,200 130 <25 <25 <25 UP-7-22' UB 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-8, 3' VZ 8/24/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-8-7.5' A 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 UP-8-12' A 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 120 53 21 <5.0 <5.0 UP-8-17' UB 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 140 890 360 13 <5.0 15 UP-8-22' UB 8/27/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 66 7.9 <5.0 <5.0 <5.0 RP-DT1-2(s) 20' UB 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 47 <5.0 <5.0 <5.0 <5.0 RP-DT1-2(s) 25' UB 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,800 8.4 <5.0 <5.0 14 RP-DT1-2(s) 30 UB 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.2 <5.0 130 570 <5.0 <5.0 180 RP-WPB-1(s) 3' VZ 10/6/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 5.6 130 <5.0 <5.0 <5.0 <5.0 RP-WPB-1(s) 7' A 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 7.9 <5.0 <5.0 <5.0 <5.0 Table 6
Soil Analytical Results - 1995 to 2009
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California
Historical Soil Table 1995_2009.xls Page 25 of 25 RMD ENVIRONMENTAL SOLUTIONS, INC.

Sample
No. Notes GW Zone Sample Date 1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene ChloroformMethylene
Chloride
Chloromethane1,1,1-
TCA 1,1-DCA Chloroethane PCE TCE cis-1,2-DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
(ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) (ug/kg) RP-WPB-1(s) 10' A 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 RP-WPB-1(s) 15' A 10/7/09 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 27 <5.0 <5.0 440 Notes:

GW Zone Groundwater Zone
ug/kg Microgram per kilogram
DCB Dichlorobenzene
TCA Trichloroethane
DCA Dichloroethane
PCE Tetrachloroethene
TCE Trichloroethene
DCE Dichloroethene
< Not detected at or above the specified reporting limit Volatile organic compound analyses (VOC) conducted after January 2002 by EPA Method 8260B.

APPENDIX C4

HISTORICAL GROUNDWATER DATA
MW-16 <0.50* MW-24 2.5* MW-13 1.33* MW-20 <0.50* PZ-2 <0.50 MW-27 <0.50 PCE=<0.50 F-2 <0.50 PCE=<0.50 MW-5 52.5* MW-4 4.43* MW-8A 9.23* MW-9 4.47/4.23 MW-19 <0.50* MC-1 MW-10 MW-2 MW-14 MW-8 MW-21 4.83* MW-29 <0.50 MW-18 0.943 PCE=<0.50 MW-28 0.602 PCE=<0.50 MW-12 <0.50* MW-22 0.597 MW-7 <0.50* MW-6 <0.50* MW-11 18.8 MW-25 <0.50* MW-1 <0.50* MW-17 47.7* MW-3 53.8* MW-26 83.8 MW-15 0.812* MW-23 6.96 FA-1 127,000 PCE=1,460 Notes: 1. Wells F-2 and MW-27 screen portions of the A- and B- zones. 2. PCE concentrations (ug/L) where reported.

3. Primary/Duplicate results presented.

4. Where well was not sampled during this event,
most recent data is posted. 05/08/20 DCB KR01-KAF-004 PROJECT NO. APP. BY:DRAWN BY:DATE HORIZONTAL SCALE IN FEET 0 120 240 FIGURE 5 A-ZONE TCE ISOCONCENTRATION CONTOURS - MARCH 2020 FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA After Apex, 2017 N Basemap from Secor, June 25, 2002 TCE Trichloroethene 1000 Approximate Sand Lens Boundary Between 5 and 10 Feet Below Ground Surface (ETIC, December 27, 2002) RDIP Direct-Push Injection Location A-zone Monitoring Well A-zone/B-zone Monitoring Well Mutichambered Monitoring Well Destroyed Well TCE Concentration (ug/L) Approximate TCE Isoconcentration Contour (ug/L) Former Kaiser Aerotech Facilities Boundary 151 PCE Tetrachloroethene LEGEND MW-28 Sodium Lactate Injection Well 1,000 - 10,000 ug/L 10,000 - 100,000 ug/L ug/L Microgram per Liter >100,000 ug/L Data Prior to March 2020* LB-2 LMW-5 22.6* LMW-7 1.36* LPZ-5 <5.0 RW-1 RW-7 <0.50* LB-5 27.3 1 11 1 1 1 1 1 1 1 1 1 1 11 1 1 1 <0.50 LMW-9 <0.50 PCE<0.50 RW-10 1 LPZ-4 UB-1 LPZ-2 <0.50 LMW-3 64.2 PZ-1 17.9 F-2 <0.50 PCE=<0.50 RW-13 <0.50 RW-3 UB-2 <0.50 RW-12 5.58 MW-27 <0.50 PCE=<0.50 LB-6 <0.50 RW-9 RW-8 UB-6 3.35 3.07 LMW-2 9.58 RW-11 LMW-10 4.96 LMW-6 LB-4 5.69 UB-4 2.46 RW-6 0.645 RW-5 0.62* UB-3 4.53 LB-3 18.3 RW-4 LPZ-3 1.30 RW-2 LB-1 LMW-4 3.38* LMW-8 <0.50* UB-5 <0.50* FUB-1 112,000 PCE=1,790 LMW-1 7.17* 10 TCE Trichloroethene µg/L Micrograms per liter 1,000 - 10,000 µg/L 10,000 - 100,000 µg/L RDIP Direct-Push Injection Location TCE concentration (ug/L) Approximate TCE Isoconcentration Contour (ug/L) 28 PCE Tetrachloroethene 01-KAF-004 05/08/20 DCB KR PROJECT NO. APP. BY:DRAWN BY:DATE HORIZONTAL SCALE IN FEET 0 120 240 FIGURE 7 B-ZONE TCE ISOCONCENTRATION CONTOURS - MARCH 2020 LEGEND FORMER KAISER AEROTECH FACILITIES 880 DOOLITTLE DRIVE & 498 HESTER STREET SAN LEANDRO, CALIFORNIA MW-27 Sodium Lactate Injection Well After Apex, 2017 N Basemap from Secor, June 25, 2002 B-zone Monitoring Well Destroyed Well Former Kaiser Aerotech Facilities Boundary Total B-zone Coarse-Grained Soil Thickness Greater Than 1 Foot Notes: 1. Wells F-2 and MW-27 screen portions of the A- and B- zones. 2. PCE concentrations (ug/L) where reported. 3. Primary/Duplicate results presented. 4. Where well was not sampled during this event, most recent data is posted. >100,000 ug/L Data Prior to March 2020* e o —ENVIRONMENTAL RMD 7^ in ri i ~~~~i i SOLUTIONS Table 3
Routine Groundwater Monitoring Program
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California

Page 1 of 2 ends

Well Groundwater HVOC Field Parameters Water Level
Number Zone (ORP, pH, SC)
PZ-2 A Annual Annual Annual
MW-22 A Annual Annual Annual
MW-23 A Annual Annual Annual
MW-26 A Annual Annual Annual
MW-11 A Biennial Biennial Biennial
MW-19 A Biennial Biennial Biennial
MW-29 A Annual Annual Annual
UB-2 UB Annual, Contingency 1 Semi-Annual Semi-Annual
LPZ-2 UB Annual, Contingency 1 Semi-Annual Semi-Annual
LPZ-3 LB Annual, Contingency 1 Semi-Annual Semi-Annual
LPZ-5 LB Annual, Contingency 1 Semi-Annual Semi-Annual
UB-3 UB Annual, Contingency 1 Semi-Annual Semi-Annual
LB-3 LB Annual, Contingency 1 Semi-Annual Semi-Annual
UB-4 UB Annual, Contingency 1 Semi-Annual Semi-Annual
LB-4 LB Annual, Contingency 1 Semi-Annual Semi-Annual
RW-5 B Contingency2 Annual Annual
RW-6 B Annual Annual Annual
RW-7 B Biennial Biennial Biennial
MW-17 A Biennial Biennial Annual
RW-13 B Annual Annual Annual
LMW-10 LB Annual Annual Annual
RW-12 B Annual Annual Annual
RW-8 B Contingency2 Annual Annual
UB-6 UB Annual Annual Annual
LB-6 LB Annual Annual Annual
LMW-2 UB Annual Annual Annual
MW-7 A Biennial => Remove Biennial => Remove Biennial => Remove LMW-4 B Biennial Biennial Biennial
LMW-8 LB Biennial Biennial Biennial
PZ-1 B Annual Annual Annual
UB-5 UB Biennial Biennial Biennial
LB-5 LB Annual Annual Annual
MW-1 A Remove Remove Annual
LMW-1 UB Biennial Biennial Annual
MW-18 A Annual Annual Annual
MW-28 A Annual Annual Annual
MW-27 A/UB Annual Annual Annual
LMW-9 UB Annual Annual Annual
Receiving Dock

ENHANCED REDUCTIVE DECHLORINATION AREAS
A-Zone Hotspots
Degreasing Tank No. 1
Breezeway Sump
Oil/Solvent Storage Area
Degreasing Tank No. 4
Railroad/Western Boundary
Table 3
Routine Groundwater Monitoring Program
Former Kaiser Aerotech Facilities
880 Doolittle Drive and 498 Hester Street
San Leandro, California

Page 2 of 2 ends

Well Groundwater HVOC Field Parameters Water Level
Number Zone (ORP, pH, SC)
FA-1 A Annual Annual Annual
FUB-1 UB Annual Annual Annual
F-2 A/UB Annual Annual Annual
MW-3 A Biennial Biennial Biennial
MW-4 A Biennial Biennial Biennial
MW-5 A Biennial Biennial Biennial
MW-6 A Biennial Biennial Biennial
MW-8A A Biennial Biennial Biennial
MW-9 A Annual Annual Annual
MW-12 A Biennial => Remove Biennial => Remove Biennial => Remove MW-13 A Biennial Biennial Biennial
MW-15 A Biennial => Remove Biennial => Remove Biennial => Remove MW-16 A Biennial Biennial Biennial
MW-20 A Biennial Biennial Biennial
MW-21 A Biennial Biennial Biennial
MW-24 A Remove Remove Annual
MW-25 A Biennial Biennial Biennial
LMW-3 UB Annual Annual Annual
LMW-5 B Biennial Biennial Biennial
LMW-7 UB Biennial Biennial Biennial
SAZ-1 C Contingency3 => Remove Contingency3 => Remove Annual => Remove SAZ-2 C Contingency3
=> Remove Contingency3 => Remove Annual => Remove
SAZ-3 C Contingency3
=> Remove Contingency3 => Remove Annual => Remove
Notes:

A A-zone - approximately 5-15 feet below ground surface B B-zone
LB Lower B-zone, generally screening 25-35 feet below ground surface UB Upper B-zone, generally screening 15-25 feet below ground surface C C-zone - below approximately 35-40 feet below ground surface HVOC - Halogenated volatile organic compounds using USEPA Method 8260B (8010 list) ORP - Oxidation-Reduction Potential (reported in millivolts (mV) SC - Specific conductance (reported in microsiemens per centimeter [µS/cm]) Annual - first quarter
Biennial - first quarter, odd numbered years
Semi-Annual - third quarter
ERD - Enhanced reductive dechlorination
MNA - Monitored natural attenuation
Contingency1
Contingency2
Contingency3
Samples will be collected at these Degreasing Tank no. 1 wells based on semi-annual (third quarter) field parameter readings.

If ORP is above 0 mV, pH is below 5.0/above 9.0, and/or specific conductance is below 1,200 µS/cm, a sample will be collected for HVOC analysis.

Samples will be collected at wells RW-5 and RW-8 based on annual field parameter readings. If ORP is above 0 mV, pH is below 5.0/above 9.0, and/or specific conductance is below 1,200 µS/cm, a sample will be collected for HVOC analysis.

Samples will be collected and field parameters will be measured at the C-zone wells if water levels indicate a downward hydraulic gradient between the B-zone and C-zone. Samples will be analyzed for HVOCs.

Discretionary samples from treatment areas may also be analyzed for ethene, ethane and methane using Method RSK 175M and/or total organic carbon using Standard Method 5310D. These supplemental analyses will be evaluated based on field parameters, and findings for nearby monitoring wells.

MONITORED NATURAL ATTENUATION
Table 4
Passive Sampler Target Depth Intervals
Former Kaiser Aerotech Facilities
San Leandro, California

Page 1 of 2 ends

Well GW Casing Screened Filter Pack Saturated, More Permeable Passive Target Depth Number Zone Diameter Interval Interval Soil Intervals within Well Screen Sampler Interval (inches) (ft bgs) (ft bgs) (ft bgs) Type (ft bgs)
PZ-2 A 2 5-12 4.2-12 9 to 9.5 HydraSleeve ~6.25-11.5
MW-22 A 2 5-15 4-15 5.5 to 8.5; 12 to 13; 13.25 to 14.5 HydraSleeve ~10.75 to 14.5 MW-23 A 2 5-15 4-15 8 to 9.75; 9.75 to 11.5 HydraSleeve ~10.75 to 14.5 MW-26 A 2 5-15 4-15 14 to 15 HydraSleeve ~10.75 to 14.5 MW-11 A 2 3-10 2.5-10 6 to 9.5 HydraSleeve ~5.75 to 9.5 MW-19 A 2 5-13 4-13 12.5 to 13 HydraSleeve ~8.75 to 12.5 MW-29 A 2 5-15 4-15 3 to 8 HydraSleeve ~10.75 to 14.5
UB-2 UB 2 15-25 13-25 17 to 17.5 HydraSleeve ~20.75 to 24.5 LPZ-2 UB 2 14-24 13-24 19 to 22 HydraSleeve ~18.25 to 22 LPZ-3 B 2 22-32 21-32 22 to 31 HydraSleeve ~27.25 to 31 LPZ-5 LB 2 25-35 24-35 29 to 30 HydraSleeve ~30.75 to 34.5 UB-3 UB 2 15-25 13-25 24 to 25 HydraSleeve ~20.75 to 24.5 LB-3 LB 2 25-35 24-35 25 to 27 HydraSleeve ~23.25 to 27 UB-4 UB 2 15-25 14-25 15 to 16; 21 to 24 HydraSleeve ~20.75 to 24.5 LB-4 LB 2 25-35 24-35 25 to 25.5; 30 to 30.5 HydraSleeve ~26.75 to 30.5 RW-5 B 4 22-32 20.5-32 26 to 31 HydraSleeve ~27.75 to 31.5 RW-6 B 4 23-33 22-33 28 to 31 HydraSleeve ~28.75 to 32.5 RW-7 B 4 22-32 20.5-32 31 to 32 HydraSleeve ~27.75 to 31.5 MW-17 A 2 3.5-10 3-10 5 to 6.5 HydraSleeve ~5.75 to 9.5 RW-13 B 4 16-26 15-26 15 to 18.5 HydraSleeve ~21.75 to 25.5 LMW-10 LB 2 25-35 24-35 27 to 27.5 HydraSleeve ~30.75 to 34.5 RW-12 B 2 15-30 14-30 15 to 18.5 HydraSleeve ~25.75 to 29.5 RW-8 B 2 15-30 13.5-30 23.5 to 25 HydraSleeve ~25.75 to 29.5 UB-6 UB 2 14-23 13-23 None reported HydraSleeve ~18.75 to 22.5 LB-6 LB 2 25-35 24-35 25 to 35 HydraSleeve ~30.75 to 34.5 LMW-2 UB 2 21-31 19-31 26.5 to 31 HydraSleeve ~26.75 to 30.5 MW-7 A 2 4-10 3.5-10 5.5 to 7.5 HydraSleeve ~5.75 to 9.5 PZ-1 B 1 18-28 16-28 18 to 20 PDB ~17 to 20.5
LMW-4 B 4 18-28 16-28 18 to 20 HydraSleeve ~23.75 to 27.5 LMW-8 LB 2 25-30 24-30 26 to 28 HydraSleeve ~24.25 to 28 UB-5 UB 2 15-25 14-25 20 to 24.5 HydraSleeve ~20.75 to 24.5 LB-5 LB 2 25-30 24-30 None reported HydraSleeve ~25.75 to 29.5 MW-1 A 2 3-10 2.5-10 6 to 9.5 HydraSleeve ~5.75 to 9.5
LMW-1 UB 2 21-25 20-25 21 to 23.5 HydraSleeve ~20.75 to 24.5 MW-18 A 2 3.5-10 3-10 4 to 5.5 HydraSleeve ~5.75 to 9.5 MW-28 A 2 5-15 4-15 14 to 15 HydraSleeve ~10.75 to 14.5 MW-27 A/UB 2 10-20 9-20 15 to 16.5 HydraSleeve ~12.75 to 16.5 LMW-9 UB 2 15-20 14-20 16.5 to 18.5 HydraSleeve ~14.75 to 18.5 FA-1 A 2 5-15 4-15 11 to 11.5 HydraSleeve ~10.75 to 14.5 A-zone Hotspots
Degreasing Tank No. 1
Receiving Dock
Oil/Solvent Storage Area
Breezeway Sump
Degreasing Tank No. 4
Railroad/Western Boundary
Table 4
Passive Sampler Target Depth Intervals
Former Kaiser Aerotech Facilities
San Leandro, California

Page 2 of 2 ends

Well GW Casing Screened Filter Pack Saturated, More Permeable Passive Target Depth Number Zone Diameter Interval Interval Soil Intervals within Well Screen Sampler Interval (inches) (ft bgs) (ft bgs) (ft bgs) Type (ft bgs)
A-zone Hotspots
FUB-1 UB 2 15-20 13-20 None reported HydraSleeve ~15.75 to 19.5 F-2 A/UB 2 10-20 9-20 15 to 19 HydraSleeve ~15.25 to 19 MW-3 A 2 3-10 2.5-10 5 to 7 HydraSleeve ~5.75 to 9.5
MW-4 A 2 3-10 2.5-10 None reported HydraSleeve ~5.75 to 9.5 MW-5 A 2 3-10 2.5-10 6 to 6.5 HydraSleeve ~5.75 to 9.5
MW-6 A 2 3-10 2.5-10 4.75 to 6 HydraSleeve ~5.75 to 9.5 MW-8A A 2 4-10 3.5-10 9 to 10 HydraSleeve ~5.75 to 9.5
MW-9 A 2 4-10 3.5-10 7 to 9 HydraSleeve ~5.75 to 9.5
MW-12 A 2 4-10 3.5-10 7.5 to 9 HydraSleeve ~5.75 to 9.5 MW-13 A 1 5-10 4.5-10 6 to 8 PDB ~6.0 to 9.5
MW-15 A 2 2.5-10 3-10 4 to 6 HydraSleeve ~5.75 to 9.5
MW-16 A 2 3-10 2-10 7 to 8 HydraSleeve ~5.75 to 9.5
MW-20 A 2 5-15 3-15 8 to 9; 13 to 15 HydraSleeve ~10.75 to 14.5 MW-21 A 2 5-15 4-15 9 to 10.5 HydraSleeve ~10.75 to 14.5 MW-24 A 2 5-15 4-15 8.75 to 9.5; 10 to 11; 13.75 to 14.5 HydraSleeve ~10.75 to 14.5 MW-25 A 2 5-15 4-15 None reported HydraSleeve ~10.75 to 14.5 LMW-3 UB 2 17.5-22.5 15-22.5 21 to 22 HydraSleeve ~18.25 to 22 LMW-5 B 2 20-30 19-30 21.5 to 24.5 HydraSleeve ~20.75 to 24.5 LMW-7 UB 2 15-25 13-25 17.5 to 20 HydraSleeve ~16.25 to 20 SAZ-1 C 2 45-55 44-55.5 45.5 to 55 HydraSleeve ~51.5 to 55 SAZ-2 C 2 50.5-55.5 48.5-56 52 to 55 HydraSleeve ~51.5 to 55 SAZ-3 C 2 39-44 37-44.5 39 to 44 HydraSleeve ~40.25 to 44 Notes:

PDB polyethylene diffusion bag
ft bgs feet below ground surface
GW Zone Groundwater Zone
A A-zone - approximately 5-15 feet below ground surface UB Upper B-zone - approximately 15-25 feet below ground surface LB Lower B-zone - approximately 25-35 feet below ground surface C C-zone - below approximately 35-40 feet below ground surface Monitored Natural Attenuation
Table 5A
Groundwater Monitoring Volatile Organic Compounds Data
A-Zone Hotspots
Former Kaiser Aerotech Facilities
San Leandro, California

Page 1 of 3 ends

1,2-DCB 1,3-DCB 1,4-DCB Chlorobenzene Chloroform Methylene Chloride
Chloromethane 1,1,1-TCA 1,1,2-TCA 1,1-DCA 1,2-DCA Chloroethane PCE TCE cis-1,2- DCE
trans-1,2-
DCE 1,1-DCE Vinyl Chloride
8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* 8260* (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) 600 - 5 70 80 5 - 200 5 5 0.5 - 5 5 6 10 6 0.5
9/8/94 - 4/4/89 9/8/94 6/17/06 2/25/89 - 2/25/89 9/8/94 6/24/90 4/4/89 - 5/89 2/25/89 9/8/94 9/8/94 2/25/89 4/4/89 PZ-2 A 6/26/03 <5.0 <5.0 <5.0 <5.0 <5.0 <50 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 1,900 3,700 650 <5.0 470 PZ-2 A 9/24/03 <5.0 <5.0 <5.0 <5.0 <5.0 <50 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2,000 3,900 430 6.6 550 PZ-2 A 3/10/04 <3.0 <3.0 4.2 <3.0 <3.0 <50 <3.0 <3.0 <3.0 <3.0 <3.0 <3.0 <3.0 2,800 4,400 470 6.6 600 PZ-2 A 9/29/04 <2.5 <2.5 4.1 <2.5 <2.5 <25 <2.5 <2.5 <2.5 2.6 <2.5 <2.5 <2.5 2,400 4,500 400 5.1 170 PZ-2 A 3/10/05 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 2,000 2,800 380 <9.0 330 PZ-2 A 9/14/05 <20 <20 <20 <20 <20 <20 <20 <20 <20 <20 <20 <20 <20 2,400 4,000 530 <20 290 PZ-2 A 3/15/06 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 1,600 3,100 470 10 260 PZ-2 A 9/20/06 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 860 3,300 380 <15 140 PZ-2 A 2/2/07 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 <9.0 870 3,300 530 12 180 PZ-2 A 8/15/07 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 1,300 3,600 620 16 180 PZ-2 A 2/5/08 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 <15 670 3,500 610 16 190 PZ-2 RDIP A 11/6/08 0.50 1.0 1.3 <0.50 <0.50 <5.0 <0.50 <0.50 <0.50 2.0 <0.50 0.77 <0.50 3.8 1.0 57 <0.50 1.9 PZ-2 RDIP A 2/2/09 0.54 1.3 1.7 <0.50 <0.50 <5.0 <0.50 <0.50 <0.50 <0.50 <0.50 1.5 <0.50 <0.50 <0.50 4.0 <0.50 0.69 PZ-2 RDIP A 2/1/10 <0.50 0.97 1.1 <0.50 <0.50 <5.0 <0.50 <0.50 <0.50 0.68 <0.50 <0.50 <0.50 <0.50 6.1 1.4 <0.50 7.1 PZ-2 RDIP A 2/9/11 <0.50 0.94 0.79 <0.50 <0.50 <5.0 <0.50 <0.50 <0.50 2.8 <0.50 <0.50 <0.50 0.85 8.6 1.1 <0.50 16 PZ-2 RDIP A 2/7/12 <0.50 1.6 0.95 <0.50 <0.50 <5.0 <1.0 <0.50 <0.50 4.1 <0.50 <0.50 <0.50 1.7 130 <0.50 1.0 160 PZ-2 RDIP, DUP A 2/7/12 <0.50 1.6 1.0 <0.50 <0.50 <5.0 <1.0 <0.50 <0.50 4.2 <0.50 <0.50 <0.50 1.8 130 <0.50 1.1 160 PZ-2 O&M A 2/13/13 <0.50 2.3 1.1 <0.50 <0.50 <5.0 <1.0 <0.50 <0.50 4.3 <0.50 <0.50 <0.50 <0.50 73 5.2 <0.50 500 PZ-2 O&M, DUP A 2/13/13 <0.50 2.4 1.2 <0.50 <0.50 <5.0 <1.0 <0.50 <0.50 4.4 <0.50 <0.50 <0.50 <0.50 74 5.2 <0.50 470 PZ-2 O&M A 2/25/14 <2.5 <2.5 <2.5 <2.5 <2.5 <5.0 <2.5 <2.5 <2.5 2.9 <2.5 <2.5 <2.5 2.8 290 23 <2.5 510 PZ-2 O&M, DUP A 2/25/14 <2.5 <2.5 <2.5 <2.5 <2.5 <5.0 <2.5 <2.5 <2.5 3.4 <2.5 <2.5 <2.5 2.8 310 25 <2.5 520 PZ-2 O&M A 6/11/15 <2.5 <2.5 <2.5 <2.5 <2.5 <5.0 <2.5 <2.5 <2.5 <2.5 <2.5 <2.5 <2.5 2.8 460 33.9 <2.5 752 PZ-2 O&M A 2/23/16 <1.7 2.6 <1.7 <1.7 <1.7 <16.6 <6.7 <1.7 <1.7 2.2 <1.7 <6.7 <1.7 <1.7 273 32.3 <1.7 737 PZ-2 O&M A 2/14/17 <2.5 <2.5 <2.5 <2.5 <2.5 <25 <10 <2.5 <2.5 <2.5 <2.5 <10 <2.5 <2.5 349 36.7 <2.5 697 PZ-2 O&M A 2/14/18 <2.5 <2.5 <2.5 <2.5 <2.5 <25 <2.5 <2.5 <2.5 <2.5 <2.5 <10 <2.5 <2.5 16.8 18.7 <2.5 403 PZ-2 O&M, 12 A 2/12/19 <0.50 3.12 1.39 <0.50 <0.50 < 5.0 <0.50 <0.50 <0.50 2.56 <0.50 <2.0 <0.50 0.856 131 67.4 <0.50 528 PZ-2 O&M, 14 A 3/10/20 <0.50 2.97 1.37 <0.50 <0.50 <2.5 <1.25 <0.50 <0.50 2.14 <0.50 <2.5 <0.50 <0.50 <10.0 32.8 <0.50 772 MW-22 A 3/27/06 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 11 < 4.0 < 4.0 < 4.0 870 310 < 4.0 6.9 98 MW-22 A 6/14/06 <2.0 <2.0 <2.0 <2.0 <2.0 <5.0 <2.0 <2.0 <2.0 12 <2.0 <2.0 <2.0 860 350 3.5 9.1 94 MW-22 A 9/20/06 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 13 < 4.0 < 4.0 < 4.0 1,700 700 15 12 100 MW-22 A 2/1/07 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 16 < 4.0 < 4.0 < 4.0 2,300 710 18 13 97 MW-22 A 5/8/07 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 11 < 4.0 < 4.0 < 4.0 2,300 840 8.6 14 89 MW-22 A 8/15/07 <2.0 <2.0 <2.0 <2.0 <2.0 < 5.0 <2.0 <2.0 <2.0 10 <2.0 <2.0 <2.0 1,200 570 6.7 15 94 MW-22 A 11/14/07 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 12 < 4.0 < 4.0 < 4.0 1,900 950 14 29 140 MW-22 A 2/5/08 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 12 < 4.0 < 4.0 < 4.0 1,200 420 6.1 13 110 MW-22 RDIP A 8/6/08 < 4.0 < 4.0 < 4.0 < 4.0 < 4.0 < 5.0 < 4.0 < 4.0 < 4.0 6.9 < 4.0 < 4.0 < 4.0 1,300 2,000 9.5 20 100 MW-22 RDIP A 2/4/09 < 1.5 < 1.5 < 1.5 < 1.5 < 1.5 < 5.0 < 1.5 < 1.5 < 1.5 2.1 < 1.5 < 1.5 < 1.5 20 280 7.1 1.9 110 MW-22 RDIP A 2/1/10 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 5.0 < 0.50 < 0.50 < 0.50 7.2 < 0.50 3.1 <0.50 70 240 4.6 4.0 96 MW-22 RDIP A 2/9/11 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 5.0 < 0.50 < 0.50 < 0.50 9.1 < 0.50 0.83 <0.50 1.2 130 5.6 <0.50 190 MW-22 RDIP A 2/7/12 <1.5 <1.5 <1.5 <1.5 <1.5 < 5.0 <2.0 <1.5 <1.5 5.7 <1.5 <1.5 <1.5 22 380 11 3.1 290 MW-22 O&M A 2/14/13 <0.90 <0.90 <0.90 <0.90 <0.90 < 5.0 <0.90 <0.90 <0.90 4.6 <0.90 <0.90 <0.90 1.3 180 45 <0.90 200 MW-22 O&M A 2/25/14 <0.90 <0.90 <0.90 <0.90 <0.90 < 5.0 <0.90 <0.90 <0.90 1.6 <0.90 <0.90 <0.90 2.3 180 29 1.2 180 Regulatory Date
MCLs
Well ID Notes GW Zone Sample Date
Table 5A
Groundwater Monitoring Volatile Organic Compounds Data
A-Zone Hotspots
Former Kaiser Aerotech Facilities
San Leandro, California

Page 2 of 3 ends