Cities Index.
Agenda packet

San Luis Obispo City Council
June 6, 2023

Document
Agenda packet
Meeting
June 6, 2023
Body
San Luis Obispo City Council
Pages
970
Original file
104.2 MB
Text extracted from the city's file for reading and search. Open the original on pub-slocity.escribemeetings.com. That file is the official record.

Operating Budget Wastewater Collections
Sewer Fund Utilities
With ongoing system impacts associated with climate change, and as ratepayers continue to reduce water consumption, lower wastewater collection system flows and increased root intrusion into system sewer laterals present challenges such as blockages and potential sewer overflows. Staff has implemented a novel artificial intelligence-based software pilot designed to review inspection and maintenance records to provide refined maintenance and capital improvement project recommendations. Staff is also pursuing research partnerships to explore decentralized wastewater treatment solutions that may help reduce operating expenses at the WRRF, and reduce blockages, odors, and corrosion in the collection system.

During the January 2023 storms, the Calle Joaquin Lift Station flooded, and experience a power outage.

While the damage was minimized to redundant equipment, staff were strained from the event which required traffic control, temporary bypass and power provisions.

Financial Plan Page 295

Page 723 of 970 ends

Operating Budget Environmental Programs
Sewer Fund Utilities
Environmental Programs
Program Description
The Environmental Programs section is responsible for ensuring compliance with various aspects of the Clean Water Act. This involves the coordination, planning, development, and implementation of mandated industrial pretreatment and stormwater programs. Industries are permitted and inspected to ensure industrial waste discharges do not harm the wastewater collection system, treatment processes at the WRRF, or Utilities department staff. Environmental Programs is also responsible for the administration of the City’s stormwater program which protects local waterways from construction site run-off, commercial, residential, and municipal activities. The Program goals are:
 Full compliance with State, Federal, and local pretreatment and stormwater regulations.  Protection of the environment, human health, and wastewater facilities from damage or injury caused by illegal discharge of regulated pollutants.
 Ensuring wastewater effluent and biosolids can be safely recycled and the prevention of harmful discharges to the City’s sanitary sewer system.
 Protection of local waterways.
 Inspection of industrial users and stormwater discharges.  Implementing the Stormwater Management Plan, WRRF Industrial Stormwater Plan, best management practices, and reporting requirements.

Core Services & Objectives
 Implement all Best Management Practices related to the Municipal Stormwater Program, Industrial Stormwater Program, and Industrial Wastewater Pretreatment Program.  Implement the WRRF Industrial Stormwater Pollution Prevention Plan to reflect changes in General Industrial Permit.
 Implement Wasteload Allocation Attainment Plan for Pathogen TMDL.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $217,190 $213,187 $234,556 10% $246,227 5%
Contract Services $13,534 $40,050 $51,550 28% $46,800 -9% Other Operating Costs $33,212 $29,000 $33,000 13% $33,000 0% Total Program $264,536 $282,237 $319,106 13% $326,027 2% Table B-32:

Financial Plan Page 296

Page 724 of 970 ends

Operating Budget Environmental Programs
Sewer Fund Utilities
Opportunities and Challenges
Future challenges include the implementation of the State’s revised Municipal Stormwater General permit anticipated to include significant additional requirements and changes. The new permit is expected to be released in 2023. Additional administration, permitting, and inspections will be required to meet the current and future requirements of the stormwater program for construction and municipal activities along with industrial and commercial facilities. The City will modify documentation and workflowsto meet the current requirements and future changes.

Environmental Programs has implemented a facility management software program to transition from its paper-based tracking system to better track permitted industries and required inspections in its Pretreatment program. For the Stormwater program, the implementation of software modules for commercial/industrial inspections, post-construction, structural BMPs, and illicit discharge is ongoing.

The program will be increasing outreach relating to an expanded fats oils and grease (FOG) municipal code, which aims to reduce blockages in the wastewater collection system resulting from improperly sized or maintained FOG collection equipment in commercial kitchens. This FOG, which should be collected and not deposited into the City maintained sewer system, can result in blockages and sewer overflows.

Financial Plan Page 297

Page 725 of 970 ends

Operating Budget Water Resource Recovery Facility
Sewer Fund Utilities
Water Resource Recovery Facility
Program Description
The WRRF receives an average of 3 million gallons of wastewater per day. Through a series of biological and mechanical processes,this flow is converted, daily, into 200,000 gallons of recycled water, 2.8 million gallons of water to support aquatic life in San Luis Obispo creek, 3 MWh of renewable electricity, and 8 tons of biosolids ready for composting. Each resource is regulated at the local, State, or Federal level, and compliance is executed by WRRF Staff. Program goals are as follows:
• Protecting public and environmental health by treating and discharging water that continuously meets all State and Federal standards.
• Beneficial reuse of biosolids that continuously meet all State and Federal standards and harness biogas for on-site electrical generation.
• Treating and delivering recycled water to the recycled water distribution system. • Continuous compliance with local air quality regulations. • Continual learning, experimentation, and optimization of operating and treatment processes. • Creating and maintaining safety and emergency response programs that meet all State and Federal requirements.
• Promoting awareness of the WRRF through community outreach, education, and volunteer training programs.

Core Services & Objectives
• Provide a variety of safe, renewable resources that adhere to all applicable regulations. • Promote a culture of learning to maintain a team on the industry’s cutting edge. • Explore and implement initiatives through Capital Improvement Projects that address a changing climate.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $2,045,741 $1,887,954 $2,145,190 13% $2,227,344 3% Contract Services $308,523 $412,616 $568,490 37% $662,586 16% Other Operating Costs $1,560,344 $1,881,895 $1,946,298 3% $1,940,186 0% Total Program $3,914,609 $4,182,465 $4,659,977 11% $4,830,115 4% Table B-34:

Financial Plan Page 298

Page 726 of 970 ends

Operating Budget Water Resource Recovery Facility
Sewer Fund Utilities
Opportunities and Challenges
The Water Resource Recovery Facility (WRRF) is nearing the completion of facility-wide construction. In the years to come, the facility will be primarily focused on meeting new regulatory requirements and capitalizing on new opportunities provided by the upgrade. To achieve this, the WRRF staff will be dedicated to developing various software platforms that will be essential for the efficient and effective operation of the facility. Regulatory compliance will involve working closely with organizations such as the Air Pollution Control District, the State Water Resources Control Board, and the Division of Drinking Water.

The WRRF is committed to addressing climate change and fiscal responsibility by leveraging new treatment processes that produce additional biogas which can be converted into electricity to offset operating costs and plans to build a second cogeneration system in 2023-24. Staff will also continue to research emerging technologies that can recover additional resources such as commercial-grade fertilizers from biosolids.

Diversity, equity, and inclusion are also top priorities for the WRRF program. As part of its efforts to promote diversity, the facility will maintain its internship program, which offers interested individuals the opportunity to gain the requisite 1800 hours of Operator-in-Training hours before obtaining Operator Certification.

To support the City’s housing goals, staff will maintain the increased treatment capacity of the facility to meet and be prepared for additional flows and loading projected in the City’s General Plan. By increasing efficiencies, the facility will be better able to allocate resources to support its long-term goals and meet the needs of the community.

Due to the January 2023 storms, the WRRF experienced increased significant increases in flows into the plant. This was a result of the heavy rainfall which indirectly entered an aging private and public wastewater collection system, and through manholes in flooded streets.

Financial Plan Page 299

Page 727 of 970 ends

Operating Budget Water Quality Lab
Sewer Fund Utilities
Water Quality Lab
Program Description
The Water Quality Laboratory (WQL) is an Environmental Laboratory Accreditation Program (ELAP) State certified laboratory that performs sampling and/or analyses in support of City services including wastewater, biosolids, recycled water, groundwater, drinking water, San Luis Obispo Creek watershed, and protecting public health. The WQL operates under regulations as defined in Title 22 of the California Code of Regulations ensuring compliance with Federal, State, and local regulations, ELAP, and National Pollutant Discharge Elimination System (NPDES) permit guidelines with other directive documents.

Core Services & Objectives
 Laboratory Analyses and Sampling. Providing analysis and sampling in support of City services.

Analyzing untreated and treated drinking water supplies, wastewater, recycled water, new construction, drinking water line repairs, surface waters, and biosolids which are used for process control, permit compliance sampling, and protecting public health. Investigation and analysis of special projects as they arise.
 Participation in ELAP. Participating in ELAP certification allows the City to perform its analysis for certain constituents, allowing for self-reporting to regulatory agencies. ELAP allows the City to streamline sample turnaround and reduces analysis costs.  Community Outreach. Participating in community-based facility tours, and internship programs that enhance relationships and communication between the City, students, community organizations, Cal Poly and Cuesta College.
 Reporting and Record-keeping. Preparing and submitting reports to local, State, and Federal regulatory agencies monthly and annually for the WRRF, Water Treatment Plant, and Stormwater program. Maintaining comprehensive files, records, reports, and computer databases.  Special Projects. Providing analysis, sampling, and documents in support of Utilities’ special projects and internal WQL projects such as negotiating the WRRF NPDES permit, WRRF nutrient loading and removal, onboarding new processes of the WRRF Upgrade, storage and generation of electronic reports, and optimization of the WRRF and Water Treatment Plant.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $559,481 $552,663 $597,330 8% $623,164 4%
Contract Services $60,192 $192,230 $173,490 -9% $126,510 -27% Other Operating Costs $78,003 $87,592 $95,877 9% $97,227 1% Total Program $697,677 $834,485 $866,697 4% $846,551 -2% Table B-35::

Financial Plan Page 300

Page 728 of 970 ends

Operating Budget Water Quality Lab
Sewer Fund Utilities
Opportunities and Challenges
The lab has expanded its role in conducting additional sampling for the Water Treatment Plant, conducting wastewater COVID-19 surveillance and sampling in partnership with the CDC, and with the State-required San Luis Obispo Creek pathogen sampling.

The lab will be a key resource for sampling, analysis, studies, and reports for the WRRF project as the City validates new processes and provides reports and samples to determine if it meets the specifications and requirements of regulatory agencies. These support services will also be critical in assisting WRRF staff in determining the most efficient operating methods that may reduce operating expenses.

Financial Plan Page 301

Page 729 of 970 ends

Water & Sewer
Utilities Revenue
Operating Budget
Water & Sewer Funds
Utilities Revenue
Program Description
The Utilities Revenue Program is responsible for the accurate and timely collection of revenues that support the City's water and wastewater programs. It provides the customer interface for billing inquiries and service requests as well as account auditing and data analysis that supports other Utilities programs. The Utilities Revenue program is funded through water and sewer fund rates and fees, with each fund generally covering 50 percent of program costs. In some circumstances Utilities Revenue collection operations are driven more predominately by one fund versus the other. In these cases, costs may be split accordingly, with each fund providing revenue for the expenses occurred on its behalf.

Core Services & Objectives
 Provide exceptional, respectful service.
 Responsible for collection of 90% of all water and sewer revenue.  Proactively manage utility meter reading contract and continually maintain the water meter database.
 Conduct accurate and timely monthly water and sewer billing and daily payment collection.  Maintain programs designed to reduce past-due payment and associated service terminations.  Monitor usage trends and analyze water use data for use in multiple studies and reports.  Maintain awareness of and compliance with applicable regulations related to utility service.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $203,629 $189,807 $205,796 8% $210,268 2%
Contract Services $207,823 $223,460 $230,067 3% $246,780 7% Other Operating Costs $126,643 $204,900 $212,987 2% $234,898 10% Total Program $538,096 $618,167 $648,850 5% $691,946 7% Opportunities and Challenges
During 2023-25, the Utilities Revenue Program will continue to expand its new rate assistance program.

Expansion of this program will allow more customers to qualify for a 15% discount on their monthly water and sewer bill. The program is compliant with Proposition 218 because it will be funded by customer late charges, not from water and sewer rates for service. The Utilities Revenue program will also continue to monitor past due customer balances and strategize ways to incentivize payment.

Table B-36:

Financial Plan Page 302

Page 730 of 970 ends

Solid Waste & Recycling
Operating Budget
General Fund
Solid Waste & Recycling
Program Description
The Solid Waste & Recycling program coordinates the planning, development, and implementation of programs and services related to solid waste, recycling, organics recycling, zero waste, and other waste diversion programs. The program is funded by AB 939 funding collected through the solid waste bills.

AB939 funds may only be used to pay for activities that divert waste from the landfill. Any funds remaining at the end of the year must remain within the Solid Waste program budget. The program goals are to:

Core Services & Objectives
 Increase organics recycling to reduce greenhouse gas emissions and create a local source of renewable energy.
 Promote the use of reusable items to reduce solid waste generation and embedded energy costs of material production and transportation.
 Partner with the San Luis Obispo County Integrated Waste Management Authority (IWMA) to provide regional solid waste and household hazardous waste collection, recycling education and outreach programs, school education, and other special programs to the community.  Ensure adequate and efficient solid waste, recycling, and organics services are provided to businesses and residents within the City of San Luis Obispo at rates that comply with Proposition 218.
 Take the lead on meeting Climate Action Plan waste diversion-related goals in coordination with the Office of Sustainability.
 Develop and implement programs to ensure the regulatory compliance with local, State, and federal legislation.

Program Budget Changes
Table B-37: Solid Waste SOBC 2023-24 2024-25
Rate Manual Updates through IWMA (One-time):

IWMA has taken the lead on updating the rate manual. This is recommended to optimize pooled regional resources for program goals. $15,000 $0
Total Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $158,140 $270,946 $276,375 2% $293,573 6%
Contract Services $24,323 $10,000 $45,500 355% $21,500 -53% Other Operating Costs $3,381 $36,510 $34,584 -5% $34,584 0% Total Program $185,845 $317,456 $356,458 12% $349,657 -2% Table B-39:

Financial Plan Page 303

Page 731 of 970 ends

Solid Waste & Recycling
Operating Budget General
Fund
Opportunities and Challenges
The Solid Waste & Recycling program is a key component to the City’s Climate Action Plan Major City Goal.

In coordination with the IWMA and the waste hauler, the program implements the State’s most extensive solid waste law of the past 30 years (Senate Bill 1383) which prescribes actions the City will take to reduce California’s landfilled organic waste by 75 percent by 2025.

In 2023-2025, the program will continue to implement priorities aligned with SB1383, as well as other internal initiatives outlined in the Climate Action Major City Goal, Climate Action Plan, and Lead by Example Plan. This includes the implementation of an SB1383 mandated enforcement program, the development of benchmark data for the City’s draft Municipal Operations Zero Waste Plan, augmenting public outreach and education efforts, and completing the roll-out of an organics recycling program for special events that take place at City facilities, including updating the City’s Special Events Rental Policy.

Financial Plan Page 304

Page 732 of 970 ends

Reservoir Operations
Operating Budget
Whale Rock Fund
Reservoir Operations
Program Description
The Whale Rock Commission is a joint powers authority with five voting members that represent two state agencies and the City of San Luis Obispo. This commission was formed to build the Whale Rock Reservoir and sets policy for its operation. The City of San Luis Obispo (City), California Men’s Colony (CMC), and California Polytechnic State University (Cal Poly) are the actual water users, sharing the costs and benefits of the reservoir in proportion to their original investment, with the City at 55%, Cal Poly at 34%, and CMC at 11%. The reservoir operations program provides for raw water storage in a 38,967-acre-foot reservoir and raw water delivery through 18 miles of pipeline and two pump stations. The program goal is safe dam operation and maintenance, and a reliable, easily treatable supply of raw water for the participating agencies. The Reservoir Operations budget is inclusive of all costs related to operation of Whale Rock, not just the City’s proportional share. The City’s proportional share of Whale Rock expenditures is collected through the Source of Supply budget.

Core Services & Objectives
 Collect, store, and pump raw water to member agencies in a reliable, cost-effective manner.  Protect the dam from vandalism and contamination through effective surveillance.  Increase awareness of Whale Rock Reservoir as a community asset. Promote public use of fishing, biking, and hiking trails. Identify additional recreational activities that do not negatively impact water quality.
 Maintain reservoir infrastructure to maximize lifespan. Manage the capital improvement program to renew infrastructure and ensure reliability of water delivery.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $695,766 $690,983 $671,319 -3% $693,778 3%
Contract Services $122,129 $143,296 $127,350 -11% $152,350 19% Other Operating Costs1 $186,945 $474,843 $702,286 48% $757,756 8% Total Program $1,004,841 $1,309,122 $1,500,955 15% $1,603,884 7% 1 Other Operating costs variance of 48% attributable to increased overhead with electric services accounting for the larger portion of the variance.

Table B-40:

Financial Plan Page 305

Page 733 of 970 ends

Operating
Budget Whale
Rock Fund
Reservoir Operations
Opportunities and Challenges
During the next budget cycle, staff at Whale Rock Reservoir have several capital projects that will occupy their time. During this time, the team will go out to bid for construction on the spillway drain repairs project that was required by the Division of Safety of Dams (DSOD). This project will ensure that the spillway underdrain system is fully operational, protecting the structural integrity of the earthen dam and spillway. Additionally, the team will conduct another capital project to repave the existing road that travels from the Whale Rock office up to the face of the dam. This paving project will ensure that staff and contractors have safe and continuous access to the face of the dam, intake structure, and spillway.

Much like what has been experienced in the Water and Sewer funds, challenges for the Whale Rock fund include escalating capital improvement delivery costs and rapidly increasing electricity costs for operation of the Whale Rock pump stations. Additionally, winter rainfall has resulted in minor landslides within public access areas around the lake and one slide which exposed a small section of the Whale Rock transmission pipeline. Repair work for these slide areas will largely be conducted by staff and is expected to be accommodated utilizing existing available operating budget.

Financial Plan Page 306

Page 734 of 970 ends

Stormwater
Operating Budget
General Fund
Stormwater
Program Description
The Stormwater and Flood Control Program maintains storm drain facilities within the City, coordinates emergency response during storms, and implements the National Pollutant Discharge Elimination System (NPDES) Permit and City Storm Water Management Plan. The Stormwater program is funded by the City’s General Fund.

Core Services & Objectives:
 A well-maintained storm drainage system that minimizes property damage from flooding.  A creek system maintained to balance conveyance with environmental concerns.  Regularly swept streets to minimize pollution entering storm drains and creeks.  Cost-effective implementation of the City’s Storm Water Management Plan.  Implementation of San Luis Obispo Creek Wasteload Allocation Attainment Plan (WAAP).  Meet State and Federal water quality regulations.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $841,889 $746,848 $847,928 13% $879,998 4%
Contract Services $206,962 $243,325 $235,440 -3% $234,740 -1% Other Operating Costs $67,078 $93,531 $111,925 20% $112,425 0% Total Program $1,115,929 $1,083,703 $1,195,293 10% $1,227,164 3% Table B-41:

Financial Plan Page 307

Page 735 of 970 ends

Page intentionally left
blank.

Financial Plan Page 308

Page 736 of 970 ends

MOBILITY SERVICES DIVISION
In 2019, the City embarked on a multi-phased reorganization to achieve an organizational structure to best position the City to efficiently meet the needs of its community in the future; and allow for both effective and efficient governance and operational innovation. The Community Services Group (CSG) continues to focus on the coordination of four departments – Community Development, Parks and Recreation, Public Works, and Utilities - under one working umbrella for continued efficiencies and innovation.

In an effort to continue focusing on staffing structures that provide opportunities for efficiency and effectiveness, the Public Works Department has combined programs into a new Mobility Services Division comprised of Bicycle and Pedestrian services (Active Transportation), Parking Services, and Transit Services. Transit and Parking Services are supported by rates and fees and function as enterprise funds while Active Transportation as a program consists of a general fund position of the Active Transportation Manager.

In establishing a Mobility Services Division, the new organizational structure will address urgent needs by enhancing internal services and collaboration, leverage available resources, address current workload needs, and enhance customer service experiences. To achieve these improvements, a reorganization of the programs of Parking, Transit, and Active Transportation allows the Public Works Department (specifically the Department Head) to have a more focused level of direct reports while providing program managers a Deputy Director to oversee their programs.

A Mobility Services Division will further the organizational effectiveness of the Transit, Parking, and Active Transpiration functions under one unified umbrella. The focus of the Mobility Services Division would be on how community members choose to get from place to place, whether that be work, school, leisure activities, visiting downtown, or weekly tasks such as grocery shopping.

Financial Plan Page 309

Page 737 of 970 ends

Transit Fund
The Service of Public Transit
SLO Transit is the local fixed-route public
transit operation for the City of San Luis
Obispo. SLO Transit operates 14 vehicles at
peak period, along eight routes within the 23
square miles of the City limits of San Luis
Obispo and California Polytechnic State
University campus. Services operate 363 days
a year. On average, one million rides were
provided annually, pre pandemic. Ridership
demographics reflect a broad cross section of
the community, seniors, persons with
disabilities, Indigent, K-12 and University
Students, Commuters and Visitors. Trips are
routinely taken to access educational, medical, employment, commercial and social opportunities throughout the service area. Transit services play a vital role, not only as a “safety net” for the public transportation dependent population, but also addresses climate change issues associated with greenhouse gases.
2023-25 Financial Plan
Key Assumptions
The Transit Enterprise fund closes out the 2023-25 Financial Plan with a balanced budget. At the end of the budget cycle, the undesignated fund balance is projected to be approximately $10.8 Million. These funds are necessary as part of a fiscally prudent operating reserve equivalent to 20% of its operating budget to help weather any volatility in revenues. Amounts in excess of the 20% reserve will be used as local “matching” funds or used for transit capital improvement plan projects that do not yet have an identified federal or state assistance grant.

When preparing the budget, the Transit Program analyzes past funding sources (federal, state, and contractual agreement with Cal Poly) and ridership trends to forecast revenues. Transit service based on costs arethen matched to revenue forecasts. Generally, bus replacement schedules are based on federally approved “useful-life” criteria and best-case scenarios for aging vehicles. In addition, the California Air Resource Board is mandating that all public transportation fleets transition to zero emission buses by 2040. Vehicle replacement depends on the availability of capital funds from discretionary grants from the state or federal government. With the award from the Federal Transit Administration of American Rescue Plan-Addition Assistance (ARPA-AA), the City can use ARPA-AA fund for operations and use its federal formula funds for bus replacements and compliance with the State’s zero emission bus mandate. The budget prepared for this two-year financial plan follows a “zero based budgeting” approach, considering each line item and its future needs anew.

As transit agencies are experiencing around the nation in the current post pandemic environment, the Financial Plan Page 310

Page 738 of 970 ends

Transit Fund
City’s transit program is in the process of restoring service to pre-pandemic level and addressing bus operator shortages. The preparation of the Short-Range Transit Plan and the Transit Innovation Plan are document that will assist the City to restore transit services. The City’s use of ARPA-AA funds will address bus operator shortages by providing sign-on bonuses and other incentives to attract new bus operators.

Historical methodologies used to determine the immediate and forecasted health of the Transit Enterprise fund have significantly changed. The Transit Program has evaluated the possible long-term impacts of the pandemic, compiled available data and performed an analysis of past trends to create a conservative and balanced budget forecast.

At this time, revenues are projected to sufficiently keep pace with escalating costs including some enhancement of service delivery. However, any significant changes, such as the expansion of the transit program, will require additional funding sources. During the second year of this Financial Plan, the Transit program will issue a Request for Proposals to obtain a vendor for Transit Operations & Maintenance.

These costs are assumed to be similar to the existing contract’s cost.

Fund Revenues
Federal funding assistance is provided to SLO Transit in the form of Federal Transit Administration (FTA) 5307 grant funds that can be used for transit service operating and capital expenses. These Federal resources are available to urbanized areas, with a population of 50,000 or more. The SLO Urbanized area includes populations of Cal Poly and adjacent county areas to reach the 50,000 population criteria. The federal share for the funding of any one of these activities is not to exceed 50 percent of operating expenses or 80 percent of capital expenses of the net project cost. Federal funds account for approximately 40% of the total operating budget and are projected to continue to grow proportionately during the next two-year Financial Plan period and five-year outlook. However, unforeseen changes in federal policy can significantly affect transit funding projections.

The Federal Government recently passed the American Rescue Plan Act (ARPA) which will provide an additional funding to the City of San Luis Obispo transit program. ARPA has formula and discretionary components. The City received $898K of formula funds which will be used for the City’s Electric Vehicle Charging Infrastructure project at the bus yard. The City received $12.3M of discretionary funds for operating assistance. The discretionary ARPA will fund 100% of net operating cost and incentives that will attract new bus drivers to the City bus service.

State funding assistance is provided to SLO Transit in the form of the State’s Transportation Development Act (TDA) funding. TDA is comprised of two sources of funding for transportation programs. The first is the Local Transportation Fund (LTF) which is derived from ¼ cent retail sales taxes, the second is State Transportation Assistance (STA) which is derived from the statewide sales tax on diesel fuel. Both funds are distributed to the regions by the State. San Luis Obispo Council of Governments (SLOCOG) then allocates this amount regionally to each of the seven cities, the County of San Luis Obispo, and the Consolidated Transportation Services Agency for the San Luis Obispo region (i.e., RTA). LTF funds are apportioned according to population for: public transit, street/road improvements and bikeway/pedestrian facilities. STA funds are formula-based and used for public transit purposes.

Financial Plan Page 311

Page 739 of 970 ends

Transit Fund
TDA funds account for 26% of the total revenue budget for SLO Transit. Based on the 2023 TDA apportionment, the City will realize an increase of 27% in TDA distribution from the prior year. This additional TDA funding will help offset the cost of services provided.

State policy requires that annual farebox revenue equal no less than 20% of the total operating budget.

Historically, the Transit Fund has had year-end operating savings that move the ratio above the 20% minimum. However, the pandemic has caused significant disruption to ridership, causing a noticeable decrease in farebox revenue. While the State has enacted legislature to forgo the 20% farebox recovery requirements for the time being, due to the pandemic, the Short-Range Transit Plan and the Transit Innovation Plan will address strategies to restore service to pre-pandemic levels.

Local revenue, from cash paid fares, pass sales and Cal Poly uses (an agreement with Cal Poly providing a Transit pass for students), amounts to 20% of the total Transit Fund operating budget. Local revenue from cash fares will likely continue to be impacted from the long-term effects of the pandemic and subsequent lower ridership. Provided the unknowns of when ridership will return to its previously numbers, there remains a need to consider the possibility of a fare increases. Staff will continue to monitor the situation and make recommendations accordingly.

Table B-41: Current Fair and Pass Cost
Fair Type Fair Cost
Regular $1.50
Senior $0.75
Pass Type Pass Cost
31 Day Regular $40.00
31 Day Student $25.00
31 Day Senior / Disabled $20.00
16 Ride Regular $24.00
15 Ride Senior / Disabled $11.25
7 Day $15.00
5 Day $12.00
3 Day $7.00
1 Day $3.25
Cal Poly plays a considerable role in the generation of local farebox and the overall health of the Transit Fund. The last four-year agreement expired June 30th, 2016. Staff has secured a two year amendment to develop a new long-term agreement that will expire on June 30, 2024. For this budget cycle, staff has used contract amounts from the amendment.

Financial Plan Page 312

Page 740 of 970 ends

Transit Fund
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
State $1,324,408 $2,154,358 $3,170,842 32% $3,265,967 3% Federal $1,877,362 $11,547,838 $7,571,830 -52% $7,675,985 1% Local $710,457 $850,000 $990,000 14% $1,050,000 6%
Interest and
Other Revenue -$126,127 $304,313 $22,301 -126% $22,573 1% Total $3,786,100 $14,856,509 $11,754,973 -26% $11,964,524 2% State TDA and Federal funding amount reflect current TDA distribution amounts. Funding amounts will be updated in future budget documents as programmed by SLOCOG as discussed above.

Fund Expenditures
Expenditures for the Transit program fall into five main categories: Purchased Transportation, Fuel and Maintenance, Overhead/Administration, Cost Allocation and, Capital Improvements.

Purchased Transportation. On July 1, 2016, the City entered into a four-year agreement with First Transit Inc. for a Transit Operations and Maintenance contract. The contract does allow for up to three one-year extensions and service cost incrementally increases each year by approximately 3%. The cost projections in the fund forecast project this as well as changes in vehicle operating hours which is the basis for reimbursement of services provided.

On July 1, 2019, the City entered the fourth year of the contract. On March 3, 2020 the City Council exercised the first of three extensions. On May 12, 2021, the City Council exercised the second of three extensions. On May 3, 2022, the City Council extended the contract for another two years. Staff will seek another amendment, with Council Approval, to add an additional year to the contract to accommodate recruitment and on-boarding of the Mobility Services Business Manager (Transit Manager) position. All amendments to date and proposed, comply with FTA procurement guidelines. Thereafter, the Transit program will conduct a Request for Proposal to secure a new long-term contract.

Fuel and Maintenance costs historically had been volatile and difficult to predict. Fuel costs have also seen a recent return to high prices. While the program generally accounts for fluctuations in fuel prices, any excessively prolonged fuel costs may have negative impacts on the transit budget. While the introduction of two electric buses in 2023 are anticipated to help reduce the Transit program’s fuel costs, the offset of energy costs is still unknown. Therefore, staff has maintained the “fueling” line item consistent until the impacts of electrification of the fleet are known.

Many of the current diesel fleet are approaching the end of their FTA defined “useful-life.” The aging fleet therefore requires more maintenance and upkeep. The introduction of two electric buses in 2023 are anticipated to help reduce the Transit program’s maintenance budget only slightly. Six additional electric buses are starting the procurement process and once received are anticipated to further reduce maintenance costs.

Table B-42:

Financial Plan Page 313

Page 741 of 970 ends

Transit Fund
Overhead and Administration is the program’s third biggest costs and accounts for the salary and benefits of the three fulltime transit employees, production and print of transit materials and guides, nonPurchased Transportation related contracts with various vendors, technology procurements and/or service agreements, auditing and accounting services, advertisement and public engagement programs, association fees, training and office supplies and other program related materials. These costs have been maintained relatively flat.

General Government expenses reimburse the General Fund for the support and expenses incurred in managing Transit related programs and projects by non-transit City Departments. The Cost Allocation Plan, which also affects the performance of farebox ratio, is considered a Central Service Cost Allocation plan by the Federal Transit Administration. This cost is approximately $400,000 in FY 2023-24 and FY 2024-25.

Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $334,738 $298,896 $457,758 35% $474,693 4%
Purchased
Transportation
Services
$2,427,829 $3,455,950 $3,683,5971 6% $3,728,597 1%
Other Operating Costs $586,168 $684,513 $1,089,516 37% $1,136,506 6% Transfers $226,183 $365,544 $463,491 21% $477,396 3%
Capital $83,057 $2,878,157 $4,607,466 37% $3,794,674 -18% Total $3,657,975 $7,130,279 $10,301,827 31% $9,611,865 -7% Transit Fund Capital Improvement Plan
Capital Projects will be limited to those projects deemed essential and that can be funded largely from grants, keeping the local match required to a minimum.

Of those projects, the retirement and replacement of six 2008 diesel buses is essential as they have reached the end of their useful life and are starting to show their wear, resulting in service failures. Given the State’s enacted Innovated Clean Transit Fleet Rule and the City’s Climate Action Plan, these buses will be replaced with zero emission (electric) buses rather than with fossil fueled buses.

Given the considerable cost to purchase electric buses, the Transit program will greatly rely on the award of discretionary grants sources (i.e., ARPA-AA, VW Grant Funds, Low Carbon Fuel Standard Credits, etc.) 1 The cost to purchase transportation services or the cost of paying the City’s vendor to staff, operate and maintain the City’s transit services is expected to increase 40% from 2022-23 to 2023-24. This increased cost is assuming ridership demand in FY 2023-24 matches pre-pandemic levels and increased salary and benefits packages are successfully negotiated and implemented for SLO Transit drivers.

Table B-43:

Financial Plan Page 314

Page 742 of 970 ends

Transit Fund
and no-cost infrastructure upgrade programs (i.e., PG&E E-fleet Ready Program) in order to complete this project.

The receipt of $12.3M of ARPA-AA funds will provide operating assistance for the next three years. As a result, the City’s apportionment of 5307 Federal funds can be used for bus replacement to comply the states zero emission mandate.

The City of San Luis Obispo Transit Program maintains several capital assets.

1. 17 Revenue Vehicles (vehicles that) and 2 Support Vehicles

2. Operations & Maintenance Facility

3. Bus wash system

4. Transit Center with Sawtooth bays and four deluxe shelters

5. 165 bus stops
Table B-44: CIP Project2 2023-24 2024-25 2025-26 2026-27 2027-28 1 Bus Replacements with EV $2,701,500 $2,226,000 $3,055,110 - $2,145,851 2 Bus Shelter Replacements $90,000 $90,000 $90,000 $90,000 $90,000 3 Downtown Transit Center
Rehabilitation (Transit Fund) - - - $140,000 $1,500,000 4 IT Replacement $10,566 $8,268 $10,719 $2,295 $2,961
5 Parking Lot Maint - Bus Yard - $25,000 $500,000 - -
6 Transit Facility EV Charging
Infrastructure $1,805,400 $1,445,406 $604,800 - $414,000 7 Total $4,607,466 $3,794,674 $4,260,629 $232,295 $4,152,812 Opportunities and Challenges
With the new Mobility Business Manager and completion of the Transit Innovation Plan and the regional Short Range Transit Plan, the City’s Transit Program can be reinvigorated. Both the plans together will evaluate new technologies and service models that will improve the overall mobility in the City. These new innovations may include micro-transit, limited express services, bus rapid transit, signal priority, and increase in bus frequencies. During the budget cycle, the two major challenges will be service restoration and ridership to pre-pandemic levels as well as acquiring zero emission buses to meet the State mandate.

Employee Summary
The Transit Program will include the following positions.

Deputy Director of Mobility Services. This full-time position will oversee the Mobility Division of the Public Works Department that includes Parking Services, Active Transportation, and the Transit programs. 2 Capital Projects are highly reliant on future discretionary grant funding. Projects will not move forward unless funding is secured. However, in order to apply for funding, Council must approve the projects first.

Financial Plan Page 315

Page 743 of 970 ends

Transit Fund
Any time that this position is engaged with Parking Services or Active Transportation work, the value of that time will be cost allocated to the appropriate fund using future Cost Allocation Plans. Staff is currently recruiting for this position.

Mobility Services Business Manager. This full-time position will oversee the transit program and business functions of the division. Staff is currently recruiting for this position.

Transit Coordinator. This full-time position oversees the operations of the transit program, and coordinates with internal and external entities for reporting. This position is filled.

Table B-45: Transit Fund 2023-24 2024-25
Transit Operations & Maintenance 3.00 3.00
Deputy Director – Mobility Services 1.00 1.00
Mobility Services Business Manager 1.00 1.00
Transit Coordinator 1.00 1.00
Financial Plan Page 316

Page 744 of 970 ends

(A)
Actual
2021‐22
(B)
Budget
2022‐23
(C)
Budget
2023‐24
(D)
Forecast
2024‐25
(E)
Projected
2025‐26
(F)
Projected
2026‐27
(G)
Projected
2027‐28
Revenue
1 Federal ‐ 5307 Operating      1,678,604       2,647,859      1,694,054      1,727,935      1,762,494 2 Federal ‐5307 Preventative
Maintenance         198,609  ‐          210,765         214,980         219,280 3 Federal ‐ 5307 Capital      4,799,979     3,471,830    3,575,985      3,647,504      3,720,455      3,794,864 4 State TDA (Transportation
Development Act) STA         305,458          359,404         443,547        456,853         470,559         484,676         499,216 5 State TDA LTF      1,018,950       1,794,954     2,727,295    2,809,114      2,893,387      2,980,189      3,069,594 6 State ‐ APCD (Air Pollution Control  ‐  ‐  ‐  ‐  ‐  ‐  ‐ 7 PG&E Grant ‐  ‐  ‐  ‐
8 Farebox Revenue         172,957          200,000         240,000        250,000         260,000         260,000         260,000 9 Cal Poly Agreement         537,500          650,000         750,000        750,000         772,500         795,675         819,545 10 State ‐ SB1 ‐  ‐              8,722            8,722              8,722              8,722              8,722 11 State ‐ LCTOP (Low Carbon Transit Ops
Program) ‐          291,000 ‐  ‐  ‐  ‐  ‐
12 ARPA Discretionary ‐       4,100,000     4,100,000    4,100,000 ‐ ‐  ‐ 13 FTA 5339 B Discretionary  ‐  ‐  ‐  ‐  ‐  ‐  ‐
14 Interest on Investment             51,618             13,313           13,579          13,851            14,128            14,410            14,699 15 Investment FMV Adjustment        (186,365) ‐  ‐  ‐  ‐  ‐  ‐ 16 Misc Revenue                 152  ‐  ‐  ‐  ‐  ‐  ‐
17 State of Good Repair (SGR)              8,468  ‐  ‐  ‐  ‐  ‐  ‐ 18 Federal Stimulus Grants                 149  ‐  ‐  ‐  ‐  ‐  ‐ 19 TOTAL REVENUES $3,786,100 $14,856,509 $11,754,973 $11,964,524 $9,971,619 $10,207,042 $10,448,413 20 Expenditures & Obligations
21 Staffing         334,738         306,115         457,758        474,693         498,428         523,349         549,516 22 Contract Services      2,427,829       2,895,950     3,078,597    3,078,597      3,170,955      3,266,084      3,364,066 23 Fuel         340,952         320,000         350,000        385,000         385,000         385,000         385,000 24 Maintenance         205,794         240,000         255,000        265,000         283,550         303,399         324,636 25 Other Operating Expenditures           39,422         124,513     1,089,516    1,136,506      1,193,331      1,252,997      1,315,647 26 Cost Allocation Transfer to GF         226,183         365,544         463,491        477,396         486,944         496,683         506,616 27 Capital           83,057      2,878,157     4,607,466    3,794,674      4,260,629         232,295      4,152,812 28 TOTAL Expenditures & Obligations: $3,657,975 $7,130,279 $10,301,827 $9,611,865 $10,278,836 $6,459,806 $10,598,294 29 CHANGES IN FINANCIAL POSITION
30 Beginning Fund Balance $2,715,598 $2,823,007 $10,536,682 $11,977,273 $14,317,377 $13,997,606 $17,732,287 31 Revenue Over/(Under) Expenses         128,125        7,726,230     1,453,146      2,352,659         (307,217)       3,747,236     (149,881) 32 Ending Fund Balance before CalPERS $2,843,723 $10,549,237 $11,989,828 $2,352,659 $14,010,161 $17,744,842 $17,582,406 33 CalPERS Additional Discretionary
Payment            20,716             12,555             12,555            12,555             12,555             12,555             12,555 34 Ending Fund Balance $2,823,007 $10,536,682 $11,977,273 $14,317,377 $13,997,606 $17,732,287 $17,569,851 35 Policy Reserve Level ‐ 20%         714,984         850,424         850,424    1,163,438      1,203,641      1,245,502      1,289,096 36 Undesignated Fund Balance $2,108,023 $9,686,258 $10,838,401 $13,153,939 $12,793,964 $16,486,784 $16,280,754 2023‐25 Financial Plan
Table B-46: Transit Fund Five Year Forecast
Financial Plan Page 317

Page 745 of 970 ends

Operating Budget Transit Operations & Maint.

Transit Fund Public Works
Transit Operations and Maintenance
Program Description
The Transit Program provides local fixed-route public transit operations within the 23 square miles of the City and adjacent Cal Poly University.

Core Services & Objectives
 Quality transportation for transit dependent people.
 Convenient transportation for all community members.
 An attractive alternative to driving which can reduce traffic congestion and air pollution.

Activities
 Federal grant management
 On-Boarding newly delivered electric buses
 Procuring six additional electric buses
 Preparing the Transit Innovation Plan
 Administration.
 Vehicle Operations and Maintenance.
 Non-Vehicle Maintenance.

Program Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $334,738 $306,115 $457,758 33% $474,693 4%
Purchased Transportation &
Other Costs
$3,013,997 $3,580,463 $4,773,113 25% $4,865,103 1.9%
Total $3,348,735 $3,886,578 $5,230,870 26% $5,339,795 2% Table B-47:

Financial Plan Page 318

Page 746 of 970 ends

Budget at a Glance
Parking Fund
The Service of Parking
The Parking Services program implements the Access and Parking Management Plan and operates and maintains the City’s parking lots, on-street metered spaces, parking structures, residential permit parking districts and timed parking areas throughout the City with focus on the downtown area and residential neighborhoods. Parking, Active Transportation, Transit, Curb Management (access) and traffic circulation are interrelated, and the Parking Services program plays an important role in the successful operations of the City’s transportation systems. The Parking Services Program works with stakeholders including businesses, residents, other government agencies, and visitors to meet their diverse parking and access needs. The Program promotes services through direct education, community outreach, engineering, and enforcement efforts that strive to balance the high demands by providing a variety of transportation and parking options.
2023-25 Financial Plan
Key Assumptions
When preparing the budget, the Parking Services Program analyzed impacts from past financial standings, upcoming operational and capital needs, as well as projected future debt obligations to assess the financial position and overall health of the Parking Fund. The budget prepared for the two-year financial plan follows a “zero based budgeting” approach, considering each line item and its future needs anew.

Asset conditions, infrastructure age, and future parking capacity needs are driving factors in determining the Capital Improvement Plan projects and debt financing scenarios. The revenues needed to support future operations and projects is then evaluated based on current rates and fee structures, analysis of current parking asset usage, and effects on future revenue potential to provide recommendations.

Consistent with previously adopted policies the Parking Fund’s proposed revenue sources and fee structure assume a conservative annual growth rate over the entire projection period.

The Parking Fund continues to experience minor impacts from the pandemic while modernization efforts continue. End of year unreserved working capital is projected to be $2 million, in line with the FY 2021-22 Year End Report projections. The revenue enhancement strategies adopted by Council with the FY 2021- 22 Year End Report provide the Parking Fund the financial resources necessary to secure bond financing to the Cultural Arts District parking structure.

Financial Plan Page 319

Page 747 of 970 ends

Budget at a Glance
Parking Fund
Minimum working capital reserve should equal at least 20% of the total Operating Program expenditures according to the City's fiscal policy and fund specific risk assessments. Based upon this policy, the minimum reserve level should be approximately $921,000 for FY 2023-24 and will increase incrementally through the Fund’s outer year projections as both expenses and revenues increase.

As an Enterprise fund, Parking can build unreserved working capital in preparation for larger infrastructure maintenance and replacement needs and smooth rates to accomplish capital investments. Revenue from the past fiscal year is anticipated to match initial projections. The Fund plans to use remaining working capital to self-finance the approximately $6.9 million for the Phase 1 costs of the Cultural Arts District parking structure and may opt to contribute additional capital towards reducing the debt obligation for Phase 2 of construction costs.

Fund Revenues
As an enterprise fund, the Parking Services Program finances its operations through rates and fees charged for parking services, property lease income, and one-time incomes such as Parking In-Lieu fee payments.

According to City Fiscal Policies, rates must be sufficient to cover operations, capital asset improvements and maintenance, debt obligations, and to maintain appropriate reserve levels to keep the fund healthy and prepared for unforeseen and long-term funding needs.

The revenues needed to support future operations and projects of the Parking Fund has been evaluated based on current approved rates and fee structures, analysis of current parking asset uses, and effects on future revenue potential to provide rate adjustment recommendations. Consistent with previously adopted policies and considering impacts associated with the Cultural Arts District parking structure, the Parking Fund still assumes a conservative annual growth rate over the entire long-term forecast period.

Table B-49: Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Parking - Lots & Streets $2,210,191 $2,268,500 $4,876,000 115%1 $4,876,000 0% Parking Structures $999,138 $1,328,450 $3,242,100 144%2 $3,388,400 5% Long Term Parking $623,639 $844,900 $695,300 -18%3 $766,300 10% Parking in-Lieu Fees $0 $20,600 $23,824 16% $23,824 0%
Interest Revenue -$348,317 $62,000 $19,900 -68%4 $11,900 -40% Fines and Forfeitures $928,636 $793,500 $852,100 7% $852,100 0% Lease Revenue $635,545 $487,800 $456,300 -6% $456,300 0% Miscellaneous Revenue $115,393 $725,000 $37,800 -95%
5 $37,800 0%
Proceeds from Debt
Financing $0 $0 $46,315,169 - $0 -100%
Total $5,164,226 $6,530,750 $56,518,493 765% $10,412,624 -82% 1 Increase due to rate increases.
2 Increase due to rate increases.
3 Decrease due to loss of parking coinciding with construction of the Cultural Arts District parking structure. 4 Decrease due to change in financial position of the Fund in support of financing and because of historical actuals. 5 Decrease due to receipt of $700,000 in one-time State Local Fiscal Recovery Funds (ARPA).

Financial Plan Page 320

Page 748 of 970 ends

Budget at a Glance
Parking Fund
Parking Rates
The Parking Services Program has approved rate increases to hourly paid parking on July 1, 2023 and July 1, 2025 to satisfy debt service obligations associated with the new Cultural Arts District Parking Structure.

Additionally, the Parking fund is required to provide funding for ongoing maintenance and repair to existing assets. Staff will be returning to Council for authorization to release a Request for Proposal (RFP) to conduct a rate assessment during FY 2023-24. Staff continue to work with marketing consultants to communicate the upcoming rate increases to ensure the community is properly notified.

Table B-50: Parking Rates
Parking Hourly Rate Changes Current Parking
Rate
Effective
July 1, 2023
Effective
July 1, 2025
1 Parking Meters Hourly Rate
2 Tier 1 (Super Core) $2.00 $4.00 $5.00
3 Tier 2 (Core) $2.00 $4.00 $5.00
4 Tier 3 (Outlying Areas) $1.50 $3.00 $3.00
5 Parking Structures Hourly Rate
6 Hourly $1.50 $3.00 $3.00
Fund Expenditures
Operating Programs
The Parking Services Program operating costs for the 2023-25 Financial Plan are summarized below. The primary operating costs for the Parking Fund consist of 1) staffing, 2) contracted services, 3) capital 4) infrastructure investments, and 5) debt service payments. Indirect costs to the Parking Fund consist of reimbursement to the General Fund for general government services such as legal and financial services to support parking programs. These amounts are calculated annually through the City’s Cost Allocation Plan.

Part-time staffing levels will also continue at a reduced rate due to the gateless modernization efforts in the parking structures.

Parking - Lots &
Streets
48%
Parking Structures
32%
Long Term Parking
7%
Lease Revenue
4%
Other Revenue
9%
CHART B-48: PARKING FUND REVENUE
Financial Plan Page 321

Page 749 of 970 ends

Budget at a Glance
Parking Fund
Table B-51: Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $1,574,054 $1,917,920 $1,922,948 0% $2,006,346 4% Contract Services $786,535 $584,065 $895,746 53%
6 $607,661 -32%7
Other Operating Costs $552,351 $623,459 $702,860 13% $694,888 -1% Transfers $1,105,120 $1,108,209 $1,387,281 25% $1,421,842 2% Easement Expenses $0 $755,000 $0 -100%8 $0 0%
Debt $855,278 $850,841 $4,195,421 393%
9 $4,117,141 -2%
Capital $1,844,160 $8,340,700 $48,594,961 482%
10 $1,382,467 -97%
Total $6,717,498 $14,180,194 $57,699,217 307% $10,230,345 -82% Proposed Changes to Operating Programs
The proposed budget includes a single Significant Operating Budget Change that will review parking fees and provide a comprehensive assessment of all rates and offered programs to align pricing with program policies and other city objectives. This enhancement is necessary to ensure that the Parking Fund can effectively cover the Fund’s debt service even during times of economic uncertainty.

Table B-52: SOBCs 2023-24 2024-25
One-time
Rate Study $ 150,000 $ -
Total $ 150,000 $ -
Capital Improvement Plan (CIP) Projects
The Five-Year Forecast continues reinvestments in the City’s parking assets with annual funding for the rehabilitation of the three parking structures to extend their useful lives as outlined in the Condition Assessment and Management Plan (CAMP). The proposed CIP budget, as part of the 2023-25 Financial Plan, has continued funding for the CAMP report implementation by earmarking $900,000 in FY 2023-24, $700,000 in FY 2024-25 and $1,000,000 in FY 2025-26 and beyond for structural repairs, waterproofing and deck sealing maintenances. This work is imperative to guaranteeing the Fund is properly maintaining its resources and is required to secure a loan for the Cultural Arts District parking structure. Project budget estimates in the capital plan forecast include inflationary adjustments assuming a moderate increase in material costs over time. The Fund continues to make infrastructure improvements with the continued addition of multi-space pay-stations which expands sidewalk mobility and the implementation of mobile application and gateless parking operations at the structures. 6 Increase due to one-time SOBC for a Parking Rate Study and because of a new security agreement. 7 Decrease due to one-time cost noted above.
8 Decrease due to one-time costs in FY 2022-23 associated with Cultural Arts District Parking Structure project. 9 Increase due to increased debt service for Cultural Arts District Parking Structure. 10 Major variance is due to the one-time anticipated costs to construct the Cultural Arts District Parking Structure estimated at $47 million.

Financial Plan Page 322

Page 750 of 970 ends

Budget at a Glance
Parking Fund
All operational improvement elements have been proposed to help ensure the Fund is able to meet the completion goal for the Cultural Arts District parking structure. Currently estimates for the structure are at $54.9 million with initial work currently underway. A $6.9 million contribution from working capital for phase 1 that will occur in FYs 2022-23 and FY 2023-24 and $47.5 million from bond financing for phase 2 of construction that will begin in FY 2023-24. The construction phase is estimated to take 18-24 months with the structure opening for operation during the FY 2025-26 period.

Table B-53: CIP Project 2023-24 2024-25 2025-26 2026-27 2027-28 Cultural Arts District Parking
Structure (Debt) $47,000,000 $0 $0 $0 $0
871 Marsh Maintenance $100,000 $0 $0 $0 $0
842 Palm Maintenance $100,000 $0 $0 $0 $0
General Parking Structure
Maintenance $700,000 $700,000 $1,000,000 $1,100,000 $1,100,000 Enforcement and Gate Entry
Equip
$300,000 $0 $0 $0 $0
HVAC Air Handler $230,000 $0 $0 $0 $0
IT Replacement $27,961 $32,467 $31,665 $2,292 $7,612
Fleet Replacement $40,000 $50,000 $0 $0 $0
Parking Pay Station Installation $0 $600,000 $600,000 $600,000 $0 License Plate Recognition $97,000 $0 $0 $0 $0
Total $48,594,961 $1,382,467 $1,631,665 $1,702,292 $1,107,612 Debt Service
Table B-54: Parking Fund Detail and Debt Retirement
The Parking Fund currently has two debt service obligations; one for the construction of the Marsh Street parking structure expansion that was built in 2002 and one for the construction of the 919 Palm Street parking structure that was built in 2006. The loan for the Marsh Street parking structure expansion is set to retire in FY 2031-32 while the loan for the 919 Palm Street parking structure will not be retired until FY 2038-39. The Fund will begin construction on its fourth parking structure in FY 2022-2023. In order to finance the construction of the Cultural Arts District Parking Structure, the parking fund plans to issue debt currently estimated at $47 million to be financed over a 30-year period. Staff anticipate receiving project bids in late June of 2023, which will provide more accurate project and debt costs.

Financial Plan Page 323

Page 751 of 970 ends

Budget at a Glance
Parking Fund
Opportunities and Challenges
With the adoption of the Access and Parking Management Plan (APMP), Parking Services is positioned to reimagine parking throughout our community. The Plan provides the framework and policy direction to align the Program with more recently adopted goals and strategies outlined in other City plans. There will be a substantial work effort to develop new programs and policies that are outlined in APMP during this financial period. While some of the identified efforts are already underway, much of staff resources are currently committed to modernization efforts, which will impact the ability to develop new programs.

Parking Services continues work efforts updating our parking structures to newer technology will be a challenge as the current gate system is outdated. These updates will be costly however this will create opportunities to increase revenue as it will make the fee collection more reliable as the current system often has failures which directly impact the revenue stream. Adding an additional parking structure will increase overall revenue which creates opportunities to better provide services to the community but faces challenges with finding funding sources to build said structure. Reducing the street parking to accommodate the Parklet project will impact revenues which is a challenge. There are opportunities to review fee structures for metered parking which can support the overall operability of the parking fund.

Employee Summary Parking
Within the parking operations and maintenance division there are currently 15 full time positions and 7.6 supplemental positions. The position breakdowns are as follows; 9.6 full time positions within parking administration, eight (8) full time positions within parking structure operations, and five (5) full time parking enforcement officers. Additionally, the Parking Services funds a portion of the salary associated with an engineering position. One (1) full time position will be added to parking structure operations once the Cultural Arts District parking structure is in operation, but Council action is not required at this time.

Table B-55: Parking Fund FTEs 2022-23 2023-24 2024-25
Parking Operations & Maintenance 19.82 22.82 22.82
Parking Services Manager 1.0 1.0 1.0
Parking Services Supervisor 1.0 1.0 1.0
Parking Meter Repair Worker 1.0 1.0 1.0
Parking Coordinator 0.0 1.0 1.0
Parking Engineer, Inspector .22 .22 .22
Parking Maintenance Worker 2.0 2.0 2.0
Parking Enforcement Officer 5.0 6.0 6.0
Administrative Assistants 2.0 3.0 3.0
Supplemental Staff (1 FTE = 2080 hours) 7.6 7.6 7.6
Financial Plan Page 324

Page 752 of 970 ends

Operating Budget Parking Operations
Parking Fund & Maintenance

PARKING OPERATIONS AND MAINTENANCE
Program Description
The Parking Services program implements the Access and Parking Management Plan and directs the operation and maintenance of the City’s parking lots, on‐street metered spaces, parking structures, residential permit parking districts and timed parking areas.

Objectives
 Promote economic and social vitality in the downtown core.  Implement the Conceptual Physical Plan for the City’s Center  Provide enough parking in the commercial core for visitors and employees.  Reduce parking demand.
 Implement the transportation strategy presented in the General Plan Circulation Element Activities
 Compliance/Enforcement
 Parking Fund Revenue Management
 Structure Operations
 Parking Management and Demand Reduction
Program Budget
Table B-56: Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $1,574,054 $1,917,920 $1,922,947 0% $2,006,347 4% Contract Services $786,535 $584,065 $895,746 53%11 $607,661 -32% Other Operating Costs $552,351 $623,458 $702,860 13% $694,888 -1% Total $2,912,940 $3,125,444 $3,521,553 13% $3,308,896 -6% 11 Increase due to one-time SOBC for a Parking Rate Study and because of a new security agreement.

Financial Plan Page 325

Page 753 of 970 ends

Table B-57: Parking Fund Five Year Forecast
Financial Plan Page 326
(A)
Actual
2021‐22
(B)
Budget
2022‐23*
(C)
Budget
2023‐24
(D)
Forecast
2024‐25
(E)
Projected
2025‐26
(F)     Proje
2026‐27
(G)     Proje
2027‐28

REVENUES
1 Service Charges
2 Parking Meter Revenues      2,210,191        2,268,500         4,876,000        4,876,000        5,688,700        5,688,700        5,688,700 3 Parking Structure Collections         999,138        1,328,450         3,242,100        3,388,400        3,655,700        3,655,700        3,667,300 4 Long‐Term Parking Revenues         623,639           844,900            695,300           766,300           768,800           743,500           759,500 5 Lease Revenues         635,545           487,800            456,300           456,300           456,300           456,300           456,300 6 Parking In‐Lieu Fees                  ‐              20,600               23,824              23,824              23,824              23,824              23,824 7 Total Services Charges      4,468,514        4,950,250         9,293,524        9,510,824     10,593,324     10,568,024     10,595,624 8 Fines & Forfeitures         928,636           793,500            852,100           852,100           852,100           852,100           852,100 9 Interest on Investment        (348,317)              62,000               19,900              11,900              12,100              17,900              22,800 10 Transfer in from GF (ARPA)           700,000
11 Other Revenues 115,393              25,000               37,800              37,800              54,200              43,300              45,100 12 TOTAL REVENUES      5,164,226        6,530,750       10,203,324     10,412,624     11,487,924     11,470,124     11,501,024 13 Proceeds from Debt Financing**       46,315,169
14 TOTAL REVENUES INCL. DEBT FINANCING      5,164,226         6,530,750        56,518,493     10,412,624     11,487,924     11,470,124     11,501,024 15 EXPENDITURES
16 Staffing 1,574,054 1,917,920         1,922,948        2,006,346        2,092,534        2,182,721        2,279,268 17 Contract Services         786,535           584,065            895,746           607,661           619,814           632,211           644,855 18 Other Operating Expenditures         552,351           623,459            702,860           694,888           738,601           799,681           867,973 19 General Government (CAP)         869,887           872,976         1,019,048        1,049,619        1,102,100        1,157,205        1,215,066 20 Operating Transfers Out         235,233           235,233            368,233           372,223           376,333           380,566           384,926 21 Total Operating Expenditures      4,018,060         4,233,653       4,908,835         4,730,737         4,929,382         5,152,384         5,392,087 22 Easement Expenses (one‐time) ‐               755,000  ‐    ‐ 23 Capital Improvement Plan Projects  1,844,160        8,340,700     48,594,961         1,382,467         1,631,665         1,702,292         1,107,600 24 TOTAL DEBT SERVICE** 855,278           850,841          4,195,421         4,117,141         4,038,829         3,960,482         3,882,099 25 TOTAL EXPENDITURES      6,717,497     14,180,195       57,699,217       10,230,346       10,599,876       10,815,158       10,381,786 CHANGES IN FINANCIAL POSITION
26 BEGINNING FUND BALANCE    11,585,166         9,931,200           3,287,929         2,061,818         2,179,200         3,067,152      3,722,019 27 Revenue Over/(Under) Expenses ($1,553,271) ($7,649,445) ($1,180,724)            182,278             887,952             654,867    1,119,160 28 ENDING BALANCE/WORKING CAPITAL
BEFORE CALPERS ADP    10,031,895         2,281,755           2,107,206         2,244,096         3,067,152         3,722,019         4,841,178 29 CalPERS ADP          100,654               61,896                45,388               64,896               64,896               64,896               64,896 30      9,931,241         2,219,859           2,061,818         2,179,200         3,067,152         3,722,019         4,841,178 31 ENDING BALANCE/WORKING CAPITAL
Policy Reserve Level ‐ 20%         839,582           882,350            990,725           954,091           992,776        1,036,300        1,083,132 32 CalPERS 115 Trust Fund              61,003               61,003              61,003              61,003              61,003              61,003 33 UNRESERVED WORKING CAPITAL       9,091,658         1,276,506       1,010,090         1,164,106         2,013,373         2,624,716         3,697,043 2023‐25 Financial Plan
* Includes budget adjustments made throughout the year
**Debt service number for FY 2023‐24 and beyond also includes the anticipated debt payment for CAD‐PS which Council will take action on at a later date.

Page 754 of 970 ends

Operating Budget
TBID Fund Tourism & BID Promotion
Tourism Business Improvement District Promotion
Program Description
The City established a Tourism Business Improvement District (TBID) as requested by the local lodging industry in 2008. The district levies an assessment on all lodging properties for the purpose of tourism promotion for the benefit of the district’s constituents. The assessment is a special revenue and is administered in a separate and distinct fund.

Objectives
 Continue diverse marketing efforts to promote overnight stays in San Luis Obispo.  Actively participate in local, regional and state organizations such as Visit SLO CAL, Central Coast Tourism Council, Downtown SLO, and other tourism organizations.

Activities
 Perform comprehensive tourism marketing efforts across paid, owned and earned channels.
 Promote and sponsor events that attract visitors from outside the County of San Luis Obispo.
 Coordinate with strategic local, regional and statewide tourism partners.  Participate in tourism tradeshows and industry conferences.  Develop, manage and implement the City’s TBID Strategic Plan and Marketing & Business Plan.

Financial Plan Page 327

Page 755 of 970 ends

Operating Budget
TBID Fund Tourism & BID Promotion
Revenue
The TBID assessment levy was set at 2% of the lodging industry’s gross receipts. For this Financial Plan the following collection is anticipated:

Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Assessment Revenue $2,111,688 $2,122,800 $2,140,800 1% $2,183,616 2% Program Operating Budget
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Staffing $225,734 $219,993 $276,698 26% $289,984 5%
Contract Services $1,317,176 $1,232,968 $1,720,784 40% $1,745,144 1% Other Operating Costs $61,565 $89,100 $89,100 0% $89,100 0% Transfers Out $37,867 $34,544 $42,816 24% 43,672 2%
Total Program $1,642,362 $1,576,605 $2,129,398 35% $2,183,616 2% Major City Goal Contributions
The Tourism Business Improvement District will support the implementation of the Economic Resiliency, Cultural Vitality & Fiscal Sustainability (ERCV&FS) Major City Goal through the work of the TBID in positioning San Luis Obispo as an ideal destination to visit. In addition, the TBID will indirectly support both the Climate Action and DEI Major City Goals through the programs like Key for Trees and DEI conscious marketing initiatives.

Opportunities and Challenges
While tourism in San Luis Obispo has rebounded incredibly since the pandemic, our market is beginning to experience a softening in the business primarily during the midweek and shoulder season periods. The City must remain aware of this adjustment to the market, and the TBID will continue to shift marketing campaigns, programs and promotions to combat the impacts.

Table 36:

Table 37:

Financial Plan Page 328

Page 756 of 970 ends

Operating Budget
Downtown SLO Downtown SLO Assessment
Downtown SLO Business Improvement District
Program Description
The Downtown Business Improvement District (DBID) was established in 1975 as a parking and promotions district for the City’s downtown area. As a special fee district, fees are collected from business license holders operating within the designated area and revenue supports the operations of Downtown SLO, a non-profit organization. The City and Downtown SLO (DSLO) agreed by contract that DSLO would provide various services for the economic, social, cultural, and environmental vitality and beautification of downtown San Luis Obispo. The assessment is a special revenue and is administered through a separate and distinct fund.

Objectives
 Support the vitality of downtown San Luis Obispo
 Assist with economic resilience efforts and attract people to shop and dine downtown Activities
Services such as: events in Mission Plaza; downtown maintenance, plaza activation & beautification; economic resilience and development.

Special Events. Integral to DSLO’s services is the provision of special events in the downtown.

Those events include:
• Holiday Activities such as the Annual Downtown Holiday Parade, Santa’s House and the Classic Carousel in Mission Plaza
• Concerts in the Plaza
• Thursday Night Promotions including the Farmers’ Market Program Budget
The Downtown Business Improvement District assessment is collected annually with the Business Tax renewal as it is based on the gross receipts of businesses located within the geographical boundary of the Downtown District.

Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Assessment Revenue $222,141 $275,000 $275,400 0.1% $280,900 2% Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Expenditures $227,202 $275,000 $275,400 0.1% $280,900 2% Table 38:

Table 39:

Financial Plan Page 329

Page 757 of 970 ends

Operating Budget
Boysen Ranch Conservation Fund Boysen Ranch
Boysen Ranch
Boysen Ranch consists of approximately 116 acres bounded by Los Osos Valley Road, Foothill Boulevard, and O’Connor Way. In 2005, the City accepted and currently holds a series of conservation easements that protect approximately 25 acres at the Boysen Ranch to mitigate for impacts to wetlands and waters by the Home Depot, Costco, and other Irish Hills Plaza development projects on Los Osos Valley Road.

Boysen Ranch is part of the City’s designated greenbelt. The funding was set up as an endowment to fund monitoring and maintenance of the restored wetland area.

Objectives
 Continue to monitor and maintain the approximately 25 acres of conservation easement area as part of the City’s greenbelt.
 Continue to monitor and maintain the wetland restoration areas.  Monitor the property to ensure adherence to conservation easement terms and successful recruitment of wetland functions and values.

Program Budget
The Boysen Ranch Conservation Fund projects to earn $2,000 annually in investment and property revenues.

Table 40: Revenue Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Investment and Property
Revenues
$-10,273 $2,000 $2,000 - $2,000 -
Table 41: Expenditures Actual Budget 2023-25 Financial Plan 2021-22 2022-23 2023-24 2021-22 2022-23 2023-24
Program Expenditures $11,739 $7,500 $7,500 - $7,500 -
Fund Balance
As of 2021-22 Year End
Boysen Ranch $405,234
The Boysen Ranch Conservation fund balance is restricted for spending on mitigation requirements of the United States Army Corps of Engineers in order to offset the loss of wetlands and associated habitat that occurred with the development of Irish Hills Plaza projects on Los Osos Valley Road. The City Council accepted a series of conservation easements that encumber a portion of Boysen Ranch on Foothill Boulevard where the required wetland restoration and enhancement activities took place. The funds can only be used for long-term maintenance and monitoring of the wetland restoration projects, as well as for the long-term administration of the conservation easements.

Table 42: Fund Balance
Financial Plan Page 330

Page 758 of 970 ends

Operating Budget
Public Safety Equipment Fund
Public Safety Equipment Fund
The Public Safety Equipment Fund (PSEF) was created with the 2019-21 Financial Plan to help budget and forecast the replacement of Public Safety equipment that has expired or become damaged. The Fund had received an original seed amount with the 2019-20 budget and, going forward, an annual allocation is made from the Local Revenue Measure and the General Fund. Budgeting annual amortized amounts set aside in this project account allows for crucial safety equipment to be replaced at scheduled intervals, which smooths out the annual contribution, reducing the impact on the budget at time of replacement.

Table 43: Program Budget Changes
SOBC Description 2023-24 2024-25
1 Police
(additional
amount)
Additional funding is being requested for FY 23/24 and 24/25 for the Police Department's equipment replacement cycle. The increase reflects current costs (inflation) and the addition of items added to the replacement cycle. Some of the items added to the replacement cycle include suppressors (15-year life span), rifle rated vests (10-year life span), and accessories to complete firearm purchases. In previous years the department was able to utilize equipment from the DRMO program (military excess equipment) at little or no cost; unfortunately, equipment from this program is no longer available to the department.
$68,512 $60,323
2 Fire
(additional
amount)
The Fire Department is requesting additional funds for the Equipment Replacement Fund for FY24, FY25 and ongoing. The fund has been an invaluable tool to ensure equipment needs are met at the Fire Department. Funding is planned long term for large purchases by helping smooth costs over an extended period eliminating the sudden need to obtain huge sums to cover a purchase. The funds contributed annually are based on prices from 2018 when the fund was established. Since then, inflation has drastically increased prices on most items necessitating an increase in annual contributions. The total cost of the Breathing Apparatus sets being purchased this year have increased by $100,000. Turnouts have increased by 30%, a $75,000 increase.

The department is consciously attempting to stagger purchases to spread costs out, however, it is not enough to sustain the fund and continue the slow, planned purchases of necessary, lifesaving equipment without increasing the annual contribution.
$102,810 $107,011
Total $171,322 $167,334
Financial Plan Page 331

Page 759 of 970 ends

Operating Budget
Public Safety Equipment Fund
Total Program Budget
dĂďůĞϰϰ͗Revenue Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Transfers In $929,344 $248,380 $391,322 58% $387,388 -1% dĂďůĞϰϱ͗Expenditures Actual Budget 2023-25 Financial Plan 2021-22 2022-23 2023-24 Change 2024-25 Change
Program Expenditures $101,554 $445,978 $112,600 -75% $403,560 258% Fund Balance
2021-22
Actual
2022-23
Projected
2023-24
Projected
2024-25
Projected
Public Safety Equipment Fund $764,849 $567,261 $845,973 $829,801 dĂďůĞϰ6͗Fund Balance (at year end)
Financial Plan Page 332

Page 760 of 970 ends

Operating Budget Avila Ranch
Community Facilities Districts
Community Facilities Districts
Avila Ranch CFD No. 2017-1
Program Description
A Mello-Roos Community Facilities District was established and approved by City Council on October 24, 2017 (Resolution No 10844) pursuant to section 5.02.1 of the Avila Ranch Development Agreement. The CFD boundaries are identical to that of the Avila Ranch Development project and located at the northeast corner of Buckley Road and Vachell Lane and includes up to 720 dwelling units, 15,000 square feet of office and retail, 18 acres of parks, 53 acres of open space, riparian corridors and farmed agricultural land.

Objectives
• To create a land-secured funding mechanism to fund authorized services of the CFD such as Maintenance and lighting of parks/ streets/ open space, flood and storm protection, Police Protection, Fire protection, maintenance, and operation of any real property. • To create a land-secured funding mechanism to fund authorized infrastructure/ facilities of the CFD such as parks/ open space, water transmission/ distribution, acquisition/ improvement/ rehabilitation, or maintenance of real property.
• Levy Special Tax through annual property tax roll.
• Fund annual costs of Services and Facilities of the CFD.

Activities
FY 2022-23 was the first year in which there were revenue and expenses associated with the CFD and only included Special Tax Revenue and a small amount of authorized services related to annual CFD administration. As development of the project progresses, it is expected that the CFD budget will grow in order to fund services provided within the CFD boundaries.

Revenue
The sole source of revenue to this Fund is a Special Tax authorized under the Mello-Roos Community Facilities Act of 1982. Revenue derived from the Special Tax funds 1. authorized services costs which include CFD administration, maintenance, trash service, water service, sewer service, electrical service, street sweeping, contingency services, misc. materials/supplies, fire protection and police protection, and

2. development of infrastructure and facilities. FY 2022-23 was the first year in which the special tax was levied against taxable parcels of the CFD. Revenue from Special Tax Services and Special Tax Infrastructure/ Facilities will continue to be levied each year per the Rate, Method of Apportionment and Manner of Collection of Special Tax (RMA). Services Special Tax will be collected indefinitely while Infrastructure/Facilities Special Tax will only be collected through FY 2035-36.

Financial Plan Page 333

Page 761 of 970 ends

Operating Budget Avila Ranch
Community Facilities Districts
See the footnote below for a description of how these funds will be used in FY 2023-24.

Revenue
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Services Special Tax $0 $145,735 $226,274 55% $466,147 106% Infrastructure/Facilities
Special Tax $0 $15,154 $23,075 52% $46,623 102%
Total Revenue $0 $160,889 $249,350 55% $512,770 105%
Program Budget/Uses
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Authorized Services1 $0 $145,735 $226,274 55% $466,147 106% Authorized
Infrastructure/ Facilities2 $0 $15,154 $23,075 52% $46,623 102% Total Program Budget/
Uses $0 $160,889 $249,350 55% $512,770 105%
1 Authorized Services includes costs associated with Maintenance, Trash Service, Street Sweeping, Water Service, Sewer Service, Electrical Service, Materials/Supplies, Capital Repairs, CFD Administration, Fire Protection and Police Protection. For FY 2023-24 $159,500 will be expended on all items noted above, expect for Fire and Police Protection. $66,774 attributable to Fire and Police Protection will remain in the fund; staff is currently working on a plan to align CFD revenues with Fire and Police Protection for the Avila Ranch CFD and these funds will be expended in a future year in support of these services.
2 There are no Authorized Infrastructure/Facilities items budgeted, therefore the $23,075 for FY 2023-24 will remain in the fund and will be expended as infrastructure/facilities projects are identified.

Table 47:

Table 48:

Financial Plan Page 334

Page 762 of 970 ends

Operating Budget San Luis Ranch
Community Facilities Districts
San Luis Ranch CFD No. 2019-1
Program Description
A Mello-Roos Community Facilities District (CFD) was established and approved by City Council on April 16, 2019 (Ordinance No 1661) pursuant to section 5.02 of the San Luis Ranch Development Agreement.

The boundaries of the CFD are identical to the San Luis Ranch Specific Plan and includes 131.4 acres approved for up to 580 dwelling units and commercial development, a 200-room hotel, 100,000 square feet of office space, 150,000 square feet of retail space, 7.8 acres of parks/ open space, and 52.3 acres of farmed agriculture land.

Objectives
• To create a land-secured funding mechanism to fund construction of authorized facilities of the CFD such as major road improvements, potable and non-potable water system improvements, drainage system improvements, wastewater system improvements, solid waste improvements, park improvements, open space improvements, utilities, and other authorized facilities under the Mello-Roos Act.
• Authorized to issue up to $25,000,000 in bonds.
• Levy Special Tax through annual property tax roll.
• Fund annual costs of CFD such as administrative expenses, Debt Service payments and costs, reserve fund for bonds, and Pay-As-You-Go costs.

Activities
CFD bonds were issued in June 2021 in the amount of $19,660,000. In March 2023, Developer requested additional bond issuance, increasing amount to $25,000,000. The additional bond issuance request is currently under review. Revenue received in FY 2023-24 is budgeted for debt service costs, City Staff Costs, Tax Administration Costs, Trustee Costs and Other Authorized Uses. There is no required maintenance for the development project for Fiscal Year 2023-24. Any excess funds available will be held to fund pay-as-you-go costs or held by the City to offset FY 2024-25 costs. Similar expenses are expected for FY 2024-25. Should the need for maintenance expenses arise during FY 2024-25, the Special Tax Revenue will need to be adjusted accordingly to fully meet obligations of this fund.

Revenue
The sole source of revenue to this Fund is a Special Tax authorized under the Mello-Roos Community Facilities Act of 1982. The CFD was authorized to begin collecting the Special Tax in Fiscal Year 2018-19.

Fiscal Year 2021-22 was the first year in which the special tax was levied against taxable parcels of the CFD. Revenue from Special Tax to cover debt service and other administrative expenses will continue to be levied each year per the Rate, Method of Apportionment and Manner of Collection of Special Tax (RMA).

Financial Plan Page 335

Page 763 of 970 ends

Operating Budget San Luis Ranch
Community Facilities Districts
Revenue/Fund Sources
Actual Budget 2023-25 Financial Plan
2021-22 2022-23
3 2023-24 Change 2024-25 Change
Special Tax Revenue $152,848 $594,374 $965,672 62% 989,372 2% Capitalized Interest $570,287 $392,153 $0 N/A $0 N/A
Total Revenue/ Fund Sources $723,135 $986,527 $965,672 -2% $989,372 2% Program Budget/Uses
Actual Budget 2023-25 Financial Plan
2021-22 2022-23 2023-24 Change 2024-25 Change
Debt Service $570,287 $909,700 $929,700 2% $952,450 2%
Staffing $0 $25,500 $26,010 2% $26,530 2%
Contract Services $4,240 $9,550 $9,962 4% $10,392 4%
Other Authorized Uses (pay-as-you
go) $0 $41,777 $0 -100% $0 0%
Total Program Budget $574,527 $986,527 $965,672 -2% $989,372 2% 3 In FY 2022-23 $392,153 Capitalized Interest was expected, however due to miscalculation, the Capitalized Interest was not available. As a result of the lack of funding, the City levied additional Special Tax in the amount of $354,276 adjusting total revenue to $948,650 and aligned expenses to revenue by removing pay-as-you go funds of $41,777. Budget for 2022-23 revised in Dec 2022 and based on $948,650 revenue and expenses. 2022-23 Budget figures reflected in chart above are consistent with the 2022-23 Avila Ranch CFD No. 2017-1 Tax Report.

Table 49:

Table 50:

Financial Plan Page 336

Page 764 of 970 ends

DEBT SECTION
Financial Plan Page 337

Page 765 of 970 ends

Page intentionally left
blank.

Financial Plan Page 338

Page 766 of 970 ends

Financial Plan Overview Debt
Debt
The City of San Luis Obispo is guided by its budget and fiscal policies when managing its debt. In accordance with the policy section “Capital Financing and Debt Management”:
• The City’s debt capacity cannot exceed 15% of
General Fund revenues.
• Its direct debt will not exceed 2% of assessed
valuations.
• No more than 60% of capital improvement outlays
will be funded from long-term debt.

Debt should only be incurred for one-time capital expenditures and not for on-going operations.

Borrowing for one-time capital expenditures allows for the cost of the project to be spread over the useful life of the asset and results in the cost being paid by future beneficiaries as well as current taxpayers.

Debt Management
The City’s bond issues are periodically reviewed by rating agencies to provide insight to the City’s financial outlook and hence its creditworthiness. The 2018 refinancing of three different lease revenue bonds was rated by Standard & Poor’s that gave the City an AA rating. The City’s Water Revenue Bonds were also rated by Standard & Poor’s; in April 2023 the rating was raised from AA- to AA while affirming a stable outlook.
• The City’s strong operating performance, a moderate longterm liability burden, strong revenue growth and solid expenditure flexibility offsetting a constrained revenue raising environment.
• The City’s gap closing capacity being superior given ample reserves and moderate revenue volatility.
• Budget management at times of recovery being very strong, leaving the City well prepared to manage the current period of economic stress.
• The City’s engagement in thorough and conservative longterm financial planning with a focus on maintaining structural budget balance.
• The City maintaining its capital assets with minimal debt reliance and proactive efforts to pay down its unfunded retirement liabilities above actuarially determined levels.

AAA
• Extremely strong capacity to meet financial
commitments. Highest rating.

AA
• Very strong capacity to meet financial
committments.

A
• Strong cpacity to meet financial commitments,
but somewhat susceptible to adverse economic
conditions and changes in circumstance.

BBB
• Adequate capacity to met financial
commitments, but more subject to adverse
economic conditions.

BB
• Less vulnerable in the near-term, but faces
major ongoiong uncertainties to adverse
business, financial, and economic conditions.

CCC
• Currently vulnerable and dependent on
favorable business, financial, and economic
conditions to meet financial committments
CC
• Highly vulnerable; default has not yet occured,
but it is expected to be a virtual certainty.

C
• Currently highly vulnerable to non-payment,
and ultimate recovery is expected to be lower
than that of higher rates obliations.

Financial Plan Page 339

Page 767 of 970 ends

Financial Plan Overview Debt
The City’s Current Debt
The City currently holds $176 million in overall outstanding debt in a combination of lease revenue bonds, State Revolving Fund loans, Infrastructure-Bank loans, and leases. The longest outstanding maturity is to 2052.

In numbers, the City’s debt payments for each of its funds are considered in its long-term financial assumptions and over the next ten years will amount to:

Year GENERAL PARKING* SEWER WATER Total
2024 1,853,674 852,116 1,382,346 1,870,392 5,958,528
2025 1,768,903 850,609 7,005,933 1,868,807 11,494,252
2026 1,761,529 848,810 7,098,607 1,865,911 11,574,858
2027 1,550,632 745,641 7,090,097 1,855,405 11,241,775
2028 1,550,418 742,858 7,088,453 1,854,858 11,236,586
2029 1,540,008 742,630 7,086,939 1,852,923 11,222,500
2030 1,543,477 741,756 6,469,600 1,864,401 10,619,233
2031 1,142,757 740,233 6,468,162 1,853,539 10,204,691
2032 1,145,940 739,585 6,466,740 1,841,432 10,193,698
2033 1,138,653 334,663 6,465,119 1,827,883 9,766,318
Grand Total 14,995,991 7,338,902 62,621,996 18,555,550 103,512,439 *Current debt only and table will be update as part of the supplemental budget after any bonds and debt schedules are confirmed for the proposed Cultural Arts District Parking Structure.

The following tables outline by fund: the current debt, the purpose, the outstanding principal, the annual debt service cost, and the retirement year of the debt. Several smaller debt issues will be paid off in 2024, but the next significant retirement of debt payments is not scheduled until 2030. $0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Graph 51: Debt Principal & Interest Payments

GENERAL

PARKING
SEWER
WATER
Table 52:

Financial Plan Page 340

Page 768 of 970 ends

Financial Plan Overview Debt
General Fund Debt Detail and Debt Retirement
Table 53: Debt Issue - Asset Outstanding
Principal
Annual
Payment
Final
Year
FY 2024
2012 Refunding Bond (Damon Garcia Sport Fields) $2,415,000 $395,500 2030 2014 Revenue Bond – LOVR Overpass $6,275,000 $420,531 2045 2018 Refunding Bond (919 Palm Street & Dispatch
Center)
$8,904,430 $942,975 2039
2018 Lease – Fire Truck $36,245 $36,533 2024
2014 State Loan – Energy Conservation $46,886 $47,121 2024 Lease – Golf Carts $50,640 $11,014 2028
$17,728,200 $1,853,674
General Fund Debt policy adherence: FY 2024 Revenue $116,174,000 Debt Payments $ 1,853,674
Percentage of Revenue 1.6%
Maximum Allowed 15%
Table 54: Parking Fund Debt Detail and Debt Retirement
Debt Issue - Asset Outstanding
Principal
Annual
Payment
Final
Year
FY 2024
2001 State I- Bank Loan - Marsh St. Garage $3,168,631 $413,021 2032 2018 Refunding Bond (919 Palm Street Structure) $4,146,337 $439,095 2039 Total Parking Fund Debt $7,314,968 $852,116
The Fund will begin construction on its fourth parking structure in FY 2022-2023. In order to finance the capital expenditure, the fund will issue debt for $47.4 million to be financed over a 30-year period.

Because the funding has not yet been secured, it is not included in the table above.

Table 55: Sewer Fund Debt Detail and Debt Retirement
Debt Issue - Asset Outstanding
Principal
Annual
Payment
Final
Year
2024
2008 Suntrust Loan $180,000 $183,780 2024
2009 State I-Bank Loan - Farm Lift Station $6,304,106 $551,173 2038 2014 US Bank Wastewater Lease Agreement $3,410,277 $617,160 2029 2018 Refunding Bond (Dispatch Center) $564,485 $30,233 2039 2019 SRF Loan – WRRF Upgrade1 $136,000,000 2054
Total Sewer Fund Debt $146,139,108 $1,382,345
1 As of 4/30/2023, the City had drawn down $74 million of the $136 million loan. Timing of the first payment is dependent on construction completion timeline.

Financial Plan Page 341

Page 769 of 970 ends

Financial Plan Overview Debt
Table 56: Water Fund Debt Detail and Debt Retirement
Debt Issue - Asset Outstanding
Principal
Annual
Payment
Final
Year
2024
2018 Refunding Bond (Dispatch Center) $258,296 $27,353 2039 2018 Refunding Water Bond (Refund 2006 Bonds) $7,860,000 $888,000 2035 2020 State I-Bank Loan – Water Treatment Plant $12,578,253 $955,039 2040 Total Water Fund Debt $20,696,549 $1,870,392
Financial Plan Page 342

Page 770 of 970 ends

CAPITAL IMPROVEMENT PLAN
Financial Plan Page 343

Page 771 of 970 ends

Page intentionally left
blank.

Financial Plan Page 344

Page 772 of 970 ends

Capital Improvement Program 2023-25
Capital Improvement Plan (CIP)
Purpose of CIP
The CIP and its annual implementation of projects is one of the primary functions of local government.

The Capital Improvement Program (CIP) enables the City to plan, schedule, and finance capital projects to ensure cost effectiveness and conformance with established plans and policies. The City’s budget process guides the capital priorities through community input, Council goal setting, Local Revenue Measure priorities, and the biennially adopted Major City Goal work programs. The CIP and its annual implementation of projects is one of the primary functions of local government.

Through its adopted CIP, the City meets community needs by providing the infrastructure required for economic vitality, neighborhood wellness, housing, transportation, sustainability, active and passive recreation, public safety, cleanliness, and other basic amenities.

With each two-year Financial Plan, the City prepares five-year CIP program recommendations for Council consideration and approval. Even though only the first two years are funded within the Financial Plan, five-year planning is a best practice and is recommended to achieve objectives of the Capital Improvement Plan.

The City systematically plans, schedules, and finances capital projects to ensure cost-effectiveness and conformance with established policies. Comprehensive policies governing the development and management of the CIP are primarily set forth in the City’s fiscal policies. The City’s construction projects and equipment expenditures costing $25,000 or more are included in the Capital Improvement Plan.

Based on the Council determined goals, and balanced with the City’s financial circumstances, the recommended capital improvement projects total $183 million for the 2023-25 Financial Plan, and $465 million over the five-year plan. City staff will work to ensure that the community is well informed of various capital projects consistent with the Public Engagement and Noticing Manual with the framework of Inform, Consult, and Collaborate.

A Note on Unprecedented CIP Circumstances
As Council is aware, the City continues to navigate economic conditions which have proven challenging on resource availability for capital projects. Cost escalation and supply chain delays hasimpacted the City’s ability to deliver capital projects within budget and within estimated timelines. As such, staff, including those who support the CIP, continue to wear multiple hats. While the CIP budget has tripled due to the voters’ passage of Measure G20, the City’s local sales tax measure, the increased revenues have proven invaluable to support variable market conditions in recent years.

On top of that, the City is in the early stages of understanding the long-term impacts of the winter storms and rainfall which has had extreme impacts on the City’s infrastructure system. This includesstorm drains, creek protection, the water and wastewater systems, and roadways among other capital assets. What this means is that there is continued uncertainty, but alongside that is continued effort by staff to identify additional funds in the form of reimbursement to continue to meet the significant needs of our community in providing it vital and meaningful infrastructure projects.

Financial Plan Page 345

Page 773 of 970 ends

Capital Improvement Program 2023-25
Active and Ongoing Capital Projects
It is important to note that capital projects often span over multiple years and even across financial plans.

Staff continuously evaluate the CIP to determine which projects are best suited for activity depending on the resources available (people and funding) and in some instances the time of the year for construction activities. As the city adopts the 2023-25 Financial Plan, many active and ongoing capital projects remain which were identified and funded for activity during prior fiscal years.

In addition to cost estimates and project budgets, it is important to understand the on-going financial impacts the CIP has on the organization and city resources. While a capital project may be considered complete, there are often ongoing maintenance or operating costs associated with a given asset. This can be seen in the need for additional staff or resources to maintain a new park or enhanced street sweeping with a new roadway or greenway being added to the city’s transportation network. While many CIP’s create efficiencies, when preparing and implementing the capital plan, staff must be mindful of the longterm impacts and needs to maintain the City’s infrastructure.

Acknowledgements
A capital budget and planning document takes countless hours of teamwork, collaboration, and patience to produce. Special thanks to departments involved in developing the CIP as led by Public Works in partnership with Administration and IT, Community Development, Finance, Fire, Parks and Recreation, Police, and Utilities. Completing this budget could not have been accomplished without the skill, dedication, and professionalism of this team.

Special thanks are also due to the CIP Review Committee of Shelly Stanwyck, Greg Hermann, Matt Horn, Emily Jackson, Aaron Floyd, Greg Avakian, Michael Codron, Chief Scott, and Chief Tuggle. I am also grateful for the staff who worked on the material and analysis in preparing the CIP including Brian Nelson, Greg Cleary, Natalie Harnett, Miguel Barcenas, Luke Schwartz, Chris Read, and many others.

Financial Plan Page 346

Page 774 of 970 ends

Capital Improvement Program 2023-25
Types of CIP Projects and Framework Used to Develop Recommendations To assist the City Manager in developing the recommended CIP for the 2023-25 Financial Plan, a designated CIP Review Committee comprised of the Assistant City Manager, Deputy City Manager, Finance Director, Police Chief, Utilities Director, Community Development Director, Parks and Recreation Director, and Public Works Director, among other staff, evaluated project requests across the City. Based on prior Council direction and public input regarding the importance of maintaining existing infrastructure, City staff positions all project requests in the following three categories. It is common in developing a CIP for a majority of the focus to be placed on Asset Replacement and Asset Maintenance, rather than on New Assets. It is critical for the City to continue to invest in repair or replacement of existing infrastructure that is attributed to the quality of life for residents.

Project Prioritization
Because the City’s infrastructure needs often exceed available funding, department staff must prioritize various projects taking into consideration timing, cost estimates, mandates, and useful life, among many other factors. With input from the CIP Review Committee and staff across the organization, the CIP addresses most urgent projects, while planning for future improvements.

The City Council adopted Resolution No. 11159 (2020 Series) which established a goal of community wide carbon neutrality by 2035, with municipal operations being carbon neutral by 2030. The CIP is a major factor in reaching these ambitious goals. As a result, staff consider project selection and timing through the lens of carbon neutrality when possible. This includes projects aimed at reducing energy consumption, reducing vehicle miles traveled (active transportation), incorporating bikes or electric vehicles into the city fleet, tree planting, and solid waste management.

Financial Plan Page 347

Page 775 of 970 ends

Capital Improvement Program 2023-25
Key Questions the CIP Committee Asks About Projects
In categorizing projects and recommending them for funding consideration, the CIP Review Committee engaged in a rigorous ranking and review framework to develop the proposed projects for both the General Fund, Enterprise Funds, and various special funds. In general, projects that maintain existing infrastructure are ranked ahead of asset replacement projects, and asset replacement projects are ranked ahead of building new assets. It is important to note that generally new assets are related to Major City Goals, community enhancements, or are critical infrastructure associated with development areas. This “ranking” however is a general guideline and is complemented by the following questions which were asked and applied equally to all projects as well.

In addition, staff identify needed projects based on factors including, but not limited to:

1. Public input through committees, community groups, community forums and/or budget hearings

2. Legal requirements or mandates

3. Policy direction from the City Council and Major City Goals

4. Best practices, asset useful life, or replacement schedules

5. Studies and assessments, and professional expertise

6. Citywide planning documents or studies; including the Active Transportation Plan, Pavement Management Plan, General Plan, Climate Action Plan, among many others.

Does project support
economic
sustainability of the
community and
organization?
Does project address a
critical community health
or safety need?
Does project make
good on ongoing
commitments?
Does project
address core
infrastructure
needs?
Does project provide a
visible and measurable
community benefit?
Does project
align with Major
City Goals?
Does project address
a Measure G
priority?
Does project have a
positive impact on
ongoing operations?
Financial Plan Page 348

Page 776 of 970 ends

Capital Improvement Program 2023-25
Capital Project Delivery
As mentioned previously, the City’s capital budget has grown significantly because of the local sales tax measure and the potential for leveraging precious capital budget dollars further with historic federal government grants. While revenues have grown, city staff have also experienced major increases in project costs and budgets in recent years.
* Includes first full year of G-20 revenue and one-time ARPA allocation With this increase in available funds comes a significant growth in proposed General Fund projects, as well as significant Enterprise Fund capital projects as noted in the summaries below. To “deliver” these projects, and given the added burden of storm recovery activities, staff continue to analyze the resources required to deliver the projects over the two-year and the five-year time horizon. Staff will continue to work on opportunitiesto implement the Management Partners Report Recommendations and fine tuning of Public Works CIP Engineering’s organizational structure, job types, functions, and tools, training, and methods to align the City’s Capital Improvement Plan with resources available.

The flow chart below outlines the various phases of a given CIP project. While not all projects enter and exit each phase, this provides a general overview of the necessary efforts that lead from the identification of a project to completion.
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
Graph 56: General Fund Capital Expenditures
Financial Plan Page 349

Page 777 of 970 ends

Financial Plan Page 350

Page 778 of 970 ends

Capital Improvement Program 2023-25
CIP Project Categories
The City categorizes CIP projects into broad functional areas that represent the support for fundamental local government activities. Projects in support of these categories extend the life of existing City assets such as streets, bike and pedestrian pathways, parks and play equipment, bridges, water and sewer infrastructure, trees, open spaces and much more. In addition to maintenance of existing assets, there are some aged assets, such as buildings or city facilities, that may need replacement or substantial improvements. Less frequent but more significant is design and construction of new projects or new assets based on community and Council priorities that enhance the overall quality of life in the City.

Financial Plan Page 351

Page 779 of 970 ends

Capital Improvement Program 2023-25
The project revenues for the City and related expenditures are organized by asset replacement, asset maintenance, and new assets. These revenues and expenditures are made up by a wide variety of funds.

As noted, the LRM is one the most significant contributors to the City’s CIP, but there are numerous other financial resources that are brought to bear in funding capital projects.

Funds and Funding Sources
The section below provides an overview of the various funding sources and structures that support the capital improvement plan, including special funds, enterprise funds and more traditional government funds. Each fund or funding sources serves different purposes, while at times comes with limitations and restrictions for eligible uses or expenses.

ID Project by Type 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Total 5-Year Total 1 Annual Asset Maintenance 25,105,036 $ $ 21,011,722 $ 27,143,198 $ 24,754,875 $ 34,103,594 $ 46,116,758 $ 132,118,424 2 Asset Replacement $ 25,963,872 $ 29,229,434 $ 28,890,682 $ 13,709,500 $ 17,209,351 $ 55,193,306 $ 115,002,839 3 New Asset $ 60,951,260 $ 13,028,642 $ 102,543,000 $ 13,732,000 $ 7,667,000 $ 73,979,902 $ 197,921,902 4 CIP Reserve $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 8,000,000 $ 20,000,000 5 Grand Total $ 116,020,168 $ 67,269,798 $ 162,576,880 $ 56,196,375 $ 62,979,945 $ 183,289,966 $ 465,043,165 Table 57:

Financial Plan Page 352

Page 780 of 970 ends

Capital Improvement Program 2023-25
Financial Plan Page 353

Page 781 of 970 ends

Capital Improvement Program 2023-25
Financial Plan Page 354

Page 782 of 970 ends

Capital Improvement Program 2023-25
Financial Plan Page 355

Page 783 of 970 ends

Capital Improvement Program 2023-25
Financial Plan Page 356

Page 784 of 970 ends

Capital Improvement Program 2023-25
Grants and Debt
The City’s CIP program, while largely comprised of funds arising from local revenues, service fees, and impact fees, also includes funding from grants and for larger projects includes debt issuance (such as the Cultural Arts District Parking Structure). The City typically receives grant funds from State or Federal agencies that either offset a burdensome cost for infrastructure or service needs, advance a positive environmental or ecological improvement, or stimulate the economy. Some grants the City receives are based upon regulation or a methodology, such as the City’s population. Discretionary grants are those grants where the City competes for limited funds to advance a specific project or a new way of doing business. Some of these discretionary grants are programmed into the City’s 2023-25 Financial Plan which is often required by the granting agencies. Grant activity across the City is primarily seen in the Transit program, as well as the improvement of the City’s transportation network.

The City typically will use a pay-as-you go approach, however, debt issuance may occur with costly projects that have a long-term useful life. Projects where debt financing is a likely approach include the Cultural Arts District Parking Structure and the Prado Road Interchange, which are outlined below. Staff consistently evaluate resource and funding capacity, keeping in mind the ability to debt finance projects as needed.

ID Table 58: Grants By Project 2023-24 2024-25 2025-26 2026-27 2027-28 1 DWR Grant $ 6,079,000
2 Mid-Higuera Bypass 6,079,000 $
3 Federal HBP Grant $ 6,000,000
4 Prado Road Bridge & Road Widening $ 6,000,000
5 SLOCOG Grant $ 1,500,000 $ 6,000,000
6 ATP - Higuera Complete Street Project 1,000,000 $
7 ATP - South/King Pedestrian Hybrid Beacon $ 500,000
8 Prado Road Interchange $ 6,000,000
9 State or Federal Grant $ 11,547,900 $ 5,926,406 $ 6,649,910 230,000$ 4,149,851$ 10 ATP - Higuera Complete Street Project 6,951,000 $
11 Bus Replacements with EV 2,701,500 $ $ 2,226,000 $ 3,055,110 2,145,851$ 12 Transit Facility EV Charging Infrastructure 1,805,400 $ $ 1,445,406 $ 604,800 414,000$ 13 Bus Shelter Replacements $ 90,000 $ 90,000 $ 90,000 90,000$ 90,000$ 14 Prado Road Bridge & Road Widening $ 2,065,000
15 ATP - Foothill Blvd Complete Street Project $ 2,400,000 16 Lead by Example $ 75,000
17 Parking Lot Maintenance - Bus Yard $ 25,000 $ 500,000 18 Downtown Transit Center Rehabilitation 140,000$ 1,500,000$ 19 USHA Grant $ 180,000
20 Higuera St. Widening - Bridge to Elks $ 180,000
21 Grand Total $ 19,306,900 $ 11,926,406 $ 12,649,910 230,000$ 4,149,851$ ID Table 59: Debt Proceeds by Project 2023-24 2024-25 2025-26 2026-27 2027-28 1 Bonds, Infrastructure Loan (Debt) $ 47,000,000 $ 74,960,000 2 Cultural Arts District Parking Structure 47,000,000 $ 3 Prado Road Interchange $ 74,960,000
4 Grand Total $ 47,000,000 $ 74,960,000
Financial Plan Page 357

Page 785 of 970 ends

Capital Improvement Program 2023-25
The tables and charts below present the City’s Fiscal Year 2023-25 Capital Improvement Plan, breaking down the various projects, types, funds, and cost estimates. The next section presents:

1. Projects by Type – All Funds

2. Expenditures by Category

3. Expenditures by Funds – All Funds

4. Expenditures by Major City Goal; and

5. A complete list of CIP Projects by Type
22%
22%
53%
3%
Chart 60: Project by Type: 2023-24
Annual Asset Maintenance Asset Replacement New Asset CIP Reserve 31%
44%
19%
6%
Chart 61: Project by Type: 2024-25
Annual Asset Maintenance Asset Replacement New Asset CIP Reserve Financial Plan Page 358

Page 786 of 970 ends

Capital Improvement Program 2023-25
CIP Expenditures by Category
Expenditures by Category FY 23-24 FY 24-25
Cultural Services 0.28% 0.45%
Environmental Protection 2.54% 1.34%
Facilities 1.07% 1.39%
Fire Safety 0.17% 0.00%
Governance 0.15% 0.15%
Information Technology 0.99% 2.99%
Multimodal Transportation 57.34% 44.48%
Neighborhood Wellness 3.25% 3.95%
Open Space 0.30% 0.48%
Police Protection 0.00% 0.13%
Recreational Services 1.14% 8.46%
Roadway Infrastructure 6.36% 8.51%
Stormwater 9.27% 5.98%
Utility Services 13.70% 15.75%
CIP Reserve 3.45% 5.95%
ID Project by Category 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Total 5-Year Total 1 Cultural Services $ 325,000 $ 300,000 $ 200,000 $ 300,000 $ 300,000 $ 625,000 $ 1,425,000 2 Environmental Protection $ 2,950,000 $ 900,000 $ 1,700,000 $ 900,000 $ 3,850,000 $ 6,450,000 3 Facilities $ 1,242,000 $ 938,178 $ 2,933,000 $ 6,063,776 $ 6,275,000 $ 2,180,178 $ 17,451,954 4 Fire Safety $ 200,000 -$ 1,200,000 $ -$ -$ 200,000 $ $ 1,400,000 5 Governance $ 175,000 $ 100,000 $ 150,000 $ 150,000 $ 150,000 $ 275,000 $ 725,000 6 Information Technology $ 1,145,500 $ 2,011,001 $ 2,695,000 $ 911,099 $ 980,794 $ 3,156,501 $ 7,743,393 7 Infrastructure & Transportation -$ -$ 213,772 $ $ 47,500 $ 3,000 -$ 264,272 $ 8 Multimodal Transportation 66,525,160 $ $ 29,919,406 $ 115,743,910 $ 12,710,000 $ 11,389,851 $ 96,444,566 $ 236,288,327 9 Neighborhood Wellness $ 3,764,972 $ 2,655,028 $ 3,985,000 $ 11,970,000 $ 10,357,500 $ 6,420,000 $ 32,732,500 10 OpenSpace $ 345,000 $ 320,000 $ 420,000 $ 320,000 $ 470,000 $ 665,000 $ 1,875,000 11 Police Protection -$ $ 90,000 $ 350,000 $ 482,000 $ 1,201,500 $ 90,000 $ 2,123,500 12 Recreational Services $ 1,320,000 $ 5,693,642 $ 270,000 $ 270,000 $ 20,000 $ 7,013,642 $ 7,573,642 13 Roadway Infrastructure $ 7,381,994 $ 5,725,000 $ 8,139,000 $ 8,655,000 $ 9,705,000 $ 13,106,994 $ 39,605,994 14 Stormwater $ 10,754,000 $ 4,025,000 $ 1,250,000 $ 1,475,000 $ 2,275,000 $ 14,779,000 $ 19,779,000 15 Utility Services $ 15,891,542 $ 10,592,543 $ 19,327,198 $ 7,942,000 $ 15,852,300 $ 26,484,085 $ 69,605,583 16 CIP Reserve $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 8,000,000 $ 20,000,000 17 Grand Total $ 116,020,168 $ 67,269,798 $ 162,576,880 $ 56,196,375 $ 62,979,945 $ 183,289,966 $ 465,043,165 Table 62:

Table 63:

Financial Plan Page 359

Page 787 of 970 ends

Capital Improvement Program 2023-25
CIP Expenditures by Fund – All Funds
ID Fund with Contributing Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Total 5-Year Total 1 207 - Public Art Private Sector Fund $ 325,000 $ 300,000 $ 200,000 $ 300,000 $ 300,000 $ 625,000 $ 1,425,000 2 General Capital Outlay $ 75,000 $ 50,000 $ 125,000 $ 125,000 3 Local Revenue Measure $ 250,000 $ 250,000 $ 200,000 $ 300,000 $ 300,000 $ 500,000 $ 1,300,000 4 211 - SB1 Road Repair $ 1,177,994 $ 1,092,000 $ 1,114,000 $ 1,136,000 $ 1,158,720 $ 2,269,994 $ 5,678,714 5 401 - Capital Outlay Fund $ 40,269,232 $ 31,535,166 $ 117,935,000 $ 40,864,776 $ 34,250,280 $ 71,804,398 $ 264,854,454 6 Bonds, Infrastructure Loan (Debt) $ 74,900,000 $ - $ 74,900,000 - $ 7 DWR Grant $ 6,079,000 $ 6,079,000 $ 6,079,000
8 Federal HBP Grant $ 6,000,000 $ 6,000,000 $ 6,000,000 9 General Capital Outlay $ 2,454,302 $ 2,305,000 $ 6,580,000 $ 3,700,000 $ 2,000,000 $ 4,759,302 $ 17,039,302 10 Local Revenue Measure $ 20,074,670 $ 20,850,166 $ 27,860,000 $ 36,969,776 $ 32,055,280 $ 40,924,836 $ 137,809,892 11 San Luis Obispo County $ 1,435,260 $ 1,435,260 $ 1,435,260 12 SLOCOG Grant $ 1,500,000 $ 6,000,000 - $ $ - $ 1,500,000 - $ $ 7,500,000 13 State or Federal Grant $ 6,951,000 $ 2,140,000 $ 2,400,000 $ - $ 9,091,000 - $ $ 11,491,000 14 Transportation Development Act TDA $ 45,000 $ 90,000 $ 45,000 $ 45,000 $ 45,000 $ 135,000 $ 270,000 15 USHA Grant $ 180,000 $ 180,000 $ 180,000
16 Zone 9 $ 1,550,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 1,700,000 $ 2,150,000 17 402 - Fleet Replacement Fund $ 805,000 $ 685,000 $ 1,157,000 $ 1,545,000 $ 2,040,000 $ 1,490,000 $ 6,232,000 18 General Capital Outlay $ 190,516 $ 195,000 $ 75,000 $ 135,000 $ 190,516 $ 595,516 19 Local Revenue Measure $ 805,000 $ 494,484 $ 962,000 $ 1,470,000 $ 1,905,000 $ 1,299,484 $ 5,636,484 20 403 - Info Tech Replacement Fund $ 1,019,028 $ 1,596,656 $ 2,575,784 $ 888,176 $ 926,270 $ 2,615,684 $ 7,005,913 21 General Capital Outlay $ 670,698 $ 1,164,484 $ 1,306,794 $ 302,508 $ 1,835,182 $ 3,444,484 22 Local Revenue Measure $ 348,330 $ 432,172 $ 1,268,990 $ 888,176 $ 623,761 $ 780,502 $ 3,561,429 23 404 - Major Facility Replacement Fund $ 822,000 $ 423,178 $ 550,000 $ 1,480,000 $ 1,580,000 $ 1,245,178 $ 4,855,178 24 General Capital Outlay $ 250,000 $ 50,000 $ 100,000 $ 550,000 $ 300,000 $ 950,000 25 Local Revenue Measure $ 572,000 $ 373,178 $ 450,000 $ 930,000 $ 1,580,000 $ 945,178 $ 3,905,178 26 405 - Infrastructure Investment Fund $ 200,000 $ 12,750,000 $ 1,150,000 $ 12,950,000 $ 14,100,000 27 General Capital Outlay $ 200,000 $ 200,000 $ 200,000 28 Infrastructure Investment Fund $ 12,750,000 $ 1,150,000 $ 12,750,000 $ 13,900,000 29 501 - Parkland Development Fund $ 800,000 $ 800,000 $ 800,000 30 503 - Airport Area Transp. Impact Fee Fund $ 126,000 -$ $ - $ 126,000 $ 126,000 31 507 - Transportation Impact Fee Fund $ 55,000 $ 237,000 $ 2,055,000 $ 55,000 $ 55,000 $ 292,000 $ 2,457,000 32 510 - Parkland Development Fund $ 200,000 $ 138,341 $ 338,341 $ 338,341 33 511 - Orcutt Area Specific Plan Park Fund $ 500,000 $ 1,211,641 $ 250,000 $ 1,711,641 $ 1,961,641 34 514 - San Luis Ranch TIF $ 7,300,000 $ - $ 7,300,000 35 515 - Orcutt Area Specific Plan TIF $ 300,000 $ 100,000 $ 2,000,000 -$ $ - $ 400,000 $ 2,400,000 36 519 - Parkland Improvement $ 836,522 $ 836,522 $ 836,522 37 601 - Water Fund $ 6,845,477 $ 5,318,759 $ 11,979,132 $ 5,776,168 $ 5,925,428 $ 12,164,236 $ 35,844,964 38 602 - Sewer Fund $ 9,304,843 $ 3,631,306 $ 8,089,641 $ 1,639,168 $ 10,710,524 $ 12,936,149 $ 33,375,482 39 611 - Parking Fund $ 48,594,961 $ 1,382,467 $ 1,631,665 $ 1,702,292 $ 1,107,612 $ 49,977,428 $ 54,418,996 40 Bonds, Infrastructure Loan (Debt) $ 47,000,000 $ 47,000,000 $ 47,000,000 41 Parking Fund $ 1,594,961 $ 1,382,467 $ 1,631,665 $ 1,702,292 $ 1,107,612 $ 2,977,428 $ 7,418,996 42 621 - Transit Fund $ 4,607,466 $ 3,794,674 $ 4,260,629 $ 232,295 $ 4,152,812 $ 8,402,140 $ 17,047,875 43 State or Federal Grant $ 4,596,900 $ 3,786,406 $ 4,249,910 $ 230,000 $ 4,149,851 $ 8,383,306 $ 17,013,067 44 Transit Fund $ 10,566 $ 8,268 $ 10,719 $ 2,295 $ 2,961 $ 18,834 $ 34,808 45 705 - Whale Rock Fund $ 194,167 $ 2,111,089 $ 329,029 $ 577,500 $ 773,300 $ 2,305,256 $ 3,985,085 46 Grand Total $ 116,020,168 $ 67,269,798 $ 162,576,880 $ 56,196,375 $ 62,979,945 $ 183,289,966 $ 465,043,165 Table 64
Financial Plan Page 360

Page 788 of 970 ends

Capital Improvement Program 2023-25
CIP Expenditures by Major City Goal
Staff look to the established Major City Goals in preparing the CIP. Although a large part of the CIP does not directly align with a specific Major City Goal (see Other category below), in many ways the CIP supports the overall core functions of local government and work toward enhancing the quality of life of residents and community members. Over the next two years, staff will continue learning more about what capital projects are responsive to the MCG to advance Diversity, Equity, Inclusion (DEI).

Note: 2023-24 amount for the Economic Resiliency, Cultural Vitality, and Fiscal Sustainability MCG accounts for the Cultural Arts District Parking Strucure funding.

Climate Action,
Open Space and
Sustainable
Transportation
30%
Diversity, Equity,
Inclusion (DEI)
<1%
Economic
Resiliency, Cultural
Vitality and Fiscal
Sustainability
44%
Housing and
Homelessness
2%
Other
24%
Chart 66: Major City Goal: 2023-24
ID Table 65: Project by Major City Goal 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Total 5-Year Total 1 Climate Action, Open Space and
Sustainable Transportation $ 34,413,894 $ 16,846,406 $ 24,005,910 $ 13,630,000 $ 19,454,851 $ 51,260,300 $ 108,351,061 2 Diversity, Equity, Inclusion (DEI) $ 250,000 $ 50,000 $ 1,000,000 $ 300,000 $ 1,300,000 3 Economic Resiliency, Cultural Vitality
and Fiscal Sustainability $ 51,111,972 $ 3,605,028 $ 1,900,000 $ 11,010,000 $ 5,460,000 $ 54,717,000 $ 73,087,000 4 Housing and Homelessness $ 1,935,260 $ 26,546,642 $ 99,350,000 $ 6,585,000 $ 3,500,000 $ 28,481,902 $ 137,916,902 5 Other $ 28,309,042 $ 20,221,722 $ 36,320,970 $ 24,971,375 $ 34,565,094 $ 48,530,764 $ 144,388,202 6 Grand Total $ 116,020,168 $ 67,269,798 $ 162,576,880 $ 56,196,375 $ 62,979,945 $ 183,289,966 $ 465,043,165 Financial Plan Page 361

Page 789 of 970 ends

Capital Improvement Program 2023-25
ID Table 68: Active Transportation Projects 2023-24 2024-25 2025-26 2026-27 2027-28 1 Active Transportation Plan Implementation $ 435,000 $ 550,000 $ 520,000 $ 2,400,000 $ 2,400,000 2 Pedestrian Facility Improvements $ 45,000 $ 150,000 $ 100,000 $ 100,000 $ 100,000 3 Bicycle Facility Improvements $ 55,000 $ 150,000 $ 100,000 $ 100,000 $ 100,000 4 Area Sealing Projects Complete Street Components $ 285,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 5 Active Transporation Plan Tier 1 Network Implementation $ 50,000 $ 50,000 $ 100,000 $ 2,000,000 $ 2,000,000 6 ATP - Foothill Boulevard Complete Street Project $ 200,000 $ 2,400,000 $ - $ - 7 ATP - Higuera Complete Street Project $ 8,251,000 $ 750,000 $ - $ - $ - 8 ATP - Orcutt Road Railroad Crossing Upgrades $ 200,000 $ - $ 500,000 $ - $ - 9 ATP - RR Safety Trail (Orcutt to Tiburon) and Bullock Culvert Replacement 300,000 $ $ 100,000 $ 2,000,000 $ - $ - 10 ATP - South/King Pedestrian Hybrid Beacon $ 500,000 $ - $ - $ - $ - 11 California & Taft Roundabout $ 500,000 $ - $ 3,022,000 12 Grand Total $ 10,386,000 $ 1,400,000 $ 8,442,000 $ 2,400,000 $ 2,400,000 CIP Expenditures to Active Transportation
The community and Council have placed strong emphasis on the City’s effort to implement the programs, policies and infrastructure projects identified in the adopted Active Transportation Plan (ATP), which includes a priority list of transportation network enhancements focused on improving safety and mobility for people walking and bicycling. While the primary focus of this Plan is on walking and bicycling, “active transportation” refers to all human-powered modes of transportation, from walking and bicycling, to scootering, skateboarding, traveling by wheelchair and using other rolling mobility devices. Over the next two years, staff will continue to deliver on the goals and objectives outlined in the ATP, as well as the Climate Action, Open Space, and Active Transportation Major City Goal, utilizing a variety of funding sources to leverage local funds. The table below outlines various ATP projects and respective funding sources that are programmed in the coming fiscal years.

Climate Action,
Open Space and
Sustainable
Transportation
25%
Diversity, Equity,
Inclusion (DEI)
<1%
Economic
Resiliency, Cultural
Vitality and Fiscal
Sustainability
5%
Housing and
Homelessness
40%
Other
30%
Chart 67: Major City Goal: 2024-25
Financial Plan Page 362

Page 790 of 970 ends

Capital Improvement Program 2023-25
CIP Expenditure by Project and Task
The tables below outline a complete list of all capital projects across all programs, departments, and funding sources. The tables present project budgets and/or cost estimates for the next five fiscal years.

Although this Financial Plan only addresses budget allocations for Fiscal Year 2023-25, it is important to understand the larger picture and future capital project investments into and beyond the five-year period.

The table is organized with the largest project budgets beginning in FY 2023-24, from top to bottom where the blue rows represent a project, and the white rows represent a given task or subproject within that project (if applicable).

ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 1 1 Cultural Arts District Parking Structure $ 47,000,000 $ 1,500,000 $ 490,000 $ - $ - $ 48,500,000 $ 48,990,000 2 2 Mid-Higuera Bypass $ 8,729,000 $ 2,850,000 $ - $ - $ - $ 11,579,000 $ 11,579,000 3 3 ATP - Higuera Complete Street Project $ 8,251,000 $ 750,000 $ - $ - $ - $ 9,001,000 $ 9,001,000 4 4 Street Reconstruction & Resurfacing $ 6,956,994 $ 5,000,000 $ 7,514,000 $ 6,000,000 $ 9,000,000 $ 11,956,994 $ 34,470,994 5 5 WRRF and Wastewater Collection Maintenance Facility $ 6,500,000 $ - $ - $ - $ - $ 6,500,000 $ 6,500,000 6 6 Waterline Replacement: Johnson - Iris to Bishop $ 3,300,000 $ - $ - $ - $ - $ 3,300,000 $ 3,300,000 7 7 Storm Response and Recovery $ 2,750,000 $ - $ - $ - $ - $ 2,750,000 $ 2,750,000 8 8 Bus Replacements with EV $ 2,701,500 $ 2,226,000 $ 3,055,110 $ - $ 2,145,851 $ 4,927,500 $ 10,128,461 9 9 Mission Plaza Concept Plan Implementation $ 2,429,972 $ 470,028 $ 100,000 $ 6,000,000 $ 4,000,000 $ 2,900,000 $ 13,000,000 10 10 Storm Drain System Replacement $ 1,875,000 $ 1,025,000 $ 825,000 $ 1,325,000 $ 1,325,000 $ 2,900,000 $ 6,375,000 11 11 Transit Facility EV Charging Infrastructure $ 1,805,400 $ 1,445,406 $ 604,800 $ - $ 414,000 $ 3,250,806 $ 4,269,606 12 12 Prado Road Interchange $ 1,435,260 $ 2,750,000 $ 91,350,000 $ 6,585,000 $ - $ 4,185,260 $ 102,120,260 13 13
Sewer-main Replacements: Taft, Hathaway, Phillips, Buena Vista, and Loomis $ 1,225,000 $ - $ - $ - $ - $ 1,225,000 $ 1,225,000 14 14 Major Facility Maintenance $ 1,152,000 $ 423,178 $ 625,000 $ 1,928,776 $ 2,015,000 $ 1,575,178 $ 6,143,954 15 879 Morro - Roof $ 100,000 $ - $ - $ - $ - $ 100,000 $ 100,000 16 ADA Transition Plan Implementation $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 30,000 $ 75,000 17 City County Community Room TI $ - $ - $ 75,000 $ - $ - $ - $ 75,000 18 City Hall Drought Tolerant Landscaping $ - $ - $ - $ - $ 35,000 $ - $ 35,000 19 City Hall Fire Alarm Fire Alarm Control Panel $ - $ - $ - $ 30,000 $ - $ - $ 30,000 20 City/County Library front steps $ - $ - $ - $ 15,000 $ 150,000 $ - $ 165,000 21 Corp Yard Fuel Island Siding / Recoating of Fuel Island and Dispensers $ 250,000 $ - $ - $ - $ - $ 250,000 $ 250,000 22 Corp Yard Roof Coating $ - $ - $ 10,000 $ 150,000 $ - $ - $ 160,000 23 Emergency Communications Center Workstation/Carpet
Replacements $ - $ - $ - $ 343,776 $ - $ - $ 343,776
24 Energy Management Controls Upgrade $ 110,000 $ - $ - $ - $ - $ 110,000 $ 110,000 25 Existing SLO Repertory Theater Tenant Improvements $ - $ - $ - $ - $ 150,000 $ - $ 150,000 26 Facility Roll Up Door Replacements - Various Locations $ 15,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 35,000 $ 95,000 27 Fire Station #1 Administration Bldg. Roof $ 60,000 $ - $ - $ - $ - $ 60,000 $ 60,000 28 Fire Station #4 - Exterior Paint $ 25,000 $ - $ - $ - $ - $ 25,000 $ 25,000 29 Fire Station 3 & 4 Carpet Replacement $ - $ - $ - $ 40,000 $ - $ - $ 40,000 30 Fleet Lifts $ - $ 50,000 $ - $ - $ - $ 50,000 $ 50,000 31 HVAC Air Handler at Parking Services $ 230,000 $ - $ - $ - $ - $ 230,000 $ 230,000 32 Hydration Stations $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 50,000 $ 125,000 33 IT Room Heat Pump Replacements $ 12,000 $ 15,000 $ 15,000 $ 20,000 $ 20,000 $ 27,000 $ 82,000 34 Jack House Roof and Widows Walk Railing $ 250,000 $ - $ - $ - $ - $ 250,000 $ 250,000 35 Ludwick and Senior Center - Exterior Paint and Shell Rehab $ - $ 250,000 $ 25,000 $ 250,000 $ - $ 250,000 $ 525,000 36 Ludwick Community Center - Roof and Solar Replacement $ - $ - $ - $ 150,000 $ 500,000 $ - $ 650,000 37 Parks and Recreation Roofing Siding and Exterior Painting $ - $ - $ 60,000 $ 250,000 $ - $ - $ 310,000 38 Police Department HVAC Package Unit Replacement $ - $ - $ 15,000 $ 100,000 $ - $ - $ 115,000 39 Police Department Hydronic System Piping Replacement $ - $ 15,000 $ 85,000 $ - $ - $ 15,000 $ 100,000 40 Railroad Museum Roof $ - $ - $ 30,000 $ 150,000 $ - $ - $ 180,000 41 Recreation Sites Tenant Improvements - Community Room/Ludwick $ - $ - $ - $ - $ 100,000 $ - $ 100,000 42 Senior Center Roof $ - $ - $ 75,000 $ - $ - $ - $ 75,000 43 Swim Center Bath House Ceiling $ - $ - $ - $ 100,000 $ - $ 100,000 - $ 44 Swim Center Deck Replacement $ - $ - $ 100,000 $ 1,000,000 - $ $ 1,100,000 - $ 45 Swim Center Furnaces (2 Furnaces) $ 40,000 $ - $ - $ - $ - $ 40,000 $ 40,000 46 Swim Center Multipurpose Room flooring $ - $ - $ - $ 20,000 $ - $ - $ 20,000 47 Swim Center Old Bath House Roof $ - $ - $ 75,000 $ 200,000 $ - $ 275,000 - $ 48 Swim Center Olympic Pool Thermal Blankets $ - $ - $ - $ 50,000 $ - $ - $ 50,000 49 Swim Center Pool Water Chemical Regulator $ 20,000 $ - $ - $ - $ - $ 20,000 $ 20,000 50 Therapy Pool Shade Structure Material Replacement $ - $ 33,178 $ - $ - $ - $ 33,178 $ 33,178 Table 69:

Financial Plan Page 363

Page 791 of 970 ends

Capital Improvement Program 2023-25
ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 51 15 IT Replacement $ 1,145,500 $ 2,011,001 $ 2,695,000 $ 911,099 $ 980,794 $ 3,156,501 $ 7,743,393 52 911 Phone System $ - $ - $ - $ 289,819 $ - $ - $ 289,819 53 Access Control (Automatic Gate Card System) $ - $ - $ - $ - $ 150,000 $ - $ 150,000 54 Asset Management (Cityworks - Utilities Integration) $ - $ 50,000 $ - $ - $ - $ 50,000 $ 50,000 55 Audio Recording System Replacement $ - $ - $ - $ 173,891 $ - $ - $ 173,891 56 Body Worn Cameras, Video Storage and Interview Rooms $ 50,000 $ 50,000 $ - $ - $ - $ 100,000 $ 100,000 57 CAD/RMS Replacement $ - $ - $ 900,000 $ - $ - $ - $ 900,000 58 CAD/RMS Study $ - $ 100,000 $ - $ - $ - $ 100,000 $ 100,000 59 City SAN $ - $ - $ - $ 223,413 $ - $ - $ 223,413
60 Dispatch Radio Consoles $ 150,000 $ - $ - $ - $ - $ 150,000 $ 150,000 61 ECC Computers $ - $ 150,000 $ - $ - $ - $ 150,000 $ 150,000 62 ECC Audio Visual System $ - $ 350,000 $ - $ - $ - $ 350,000 $ 350,000 63 ECC Equipment Replacement $ 35,000 $ 35,000 $ - $ - $ 39,393 $ 70,000 $ 109,393 64 ECC UPS $ - $ - $ 161,000 $ - $ - $ - $ 161,000
65 Escribe replacement $ - $ - $ - $ - $ 40,000 $ - $ 40,000 66 Fire Station Alerting System $ - $ - $ 340,000 $ - $ - $ - $ 340,000 67 Firewall Replacement $ - $ 250,000 $ - $ - $ - $ 250,000 $ 250,000 68 Motion ERP $ 150,000 $ 150,000 $ - $ - $ - $ 300,000 $ 300,000 69 Network Security Upgrade $ - $ 125,000 $ - $ - $ 136,131 $ 125,000 $ 261,131 70 Network Switching Infrastructure Equipment $ 550,000 $ - $ - $ - $ - $ 550,000 $ 550,000 71 Parks & Rec ActiveNet Software Replacement $ - $ - $ 50,000 $ - $ - $ - $ 50,000 72 PD SAN $ - $ - $ - $ 163,199 $ - $ - $ 163,199
73 PD/City backup storage, secondary storage $ 75,000 $ - $ - $ - $ - $ 75,000 $ 75,000 74 Police CAD Hardware (Servers and Storage) $ - $ - $ - $ - $ 405,746 $ - $ 405,746 75 Public Safety MDC and In-Car Video Replacement $ - $ 250,000 $ 443,000 $ - $ - $ 250,000 $ 693,000 76 Public Safety Specialized Surveillance cameras (PODs) Replacement $ - $ - $ 63,000 $ 60,777 $ 50,648 $ - $ 174,425 77 Public Surveillance Cameras -citywide 5 year replace $ 40,000 $ - $ 51,000 $ - $ - $ 40,000 $ 91,000 78 Public Surveillance Citywide Cameras Storage add redundancy $ 40,000 $ - $ - $ - $ - $ 40,000 $ 40,000 79 Radio Handhelds & Mobiles $ - $ - $ 145,000 $ - $ - $ 145,000 - $ 80 Radios, Mobiles and stations not replaced - EF & PW Only $ - $ 200,000 $ - $ - $ 200,000 - $ $ 200,000 81 Security Video System Replacement (Camera Software) $ 55,500 $ - $ - $ - $ - $ 55,500 $ 55,500 82 Uninterruptible Power Supplies (UPS’s Servers and Storage) $ - $ 51,001 $ - $ - $ 53,586 $ 51,001 $ 104,587 83 Utility Billing System $ - $ 150,000 $ - $ - $ 150,000 - $ $ 150,000 84 Virtual Private Network Replace $ - $ 100,000 $ - $ - $ 100,000 - $ $ 100,000 85 VMware Infrastructure Upgrade $ - $ - $ 242,000 $ - $ - $ 242,000 - $ 86 VoIP Telephone System $ - $ - $ 300,000 $ - $ - $ 300,000 - $ 87 Wireless System Citywide $ - $ - $ - $ - $ 105,290 $ 105,290 - $ 88 16 Parks and Rec General Plan Implementation $ 800,000 $ - $ - $ - $ 800,000 - $ $ 800,000 89 17 Fleet Replacement: Public Works $ 770,000 $ 395,000 $ 612,000 $ 1,110,000 $ 1,385,000 $ 1,165,000 $ 4,272,000 90 Engineering Compact Pickup $ - $ - $ - $ - $ 65,000 $ - $ 65,000 91 Engineering Compact Pickup $ - $ - $ 65,000 $ - $ - $ - $ 65,000 92 Engineering Compact Pickup $ - $ - $ 65,000 $ - $ - $ - $ 65,000 93 Facilities Maintenance 3/4 ton Pickup with Utility Bed $ - $ 75,000 $ - $ 75,000 $ - $ 75,000 $ 150,000 94 Fleet Motor Pool Compact Pickup $ - $ - $ - $ - $ 70,000 $ - $ 70,000 95 Park Maintenance Mower $ - $ - $ - $ 85,000 $ - $ - $ 85,000 96 Parking Compact Pickup $ - $ 50,000 $ - $ - $ - $ 50,000 $ 50,000 97 Parking Scooters/LPR equipped vehicle $ 40,000 $ - $ - $ - $ - $ 40,000 $ 40,000 98 Parks Maint Mower $ - $ - $ - $ 85,000 $ - $ - $ 85,000 99 Parks Maint Refuse Truck $ - $ - $ - $ 250,000 $ - $ 250,000 - $ 100 Parks Maint Turf Tender $ - $ - $ 22,000 $ - $ - $ - $ 22,000 101 Parks Maintenance 3/4 ton Pickup $ - $ 140,000 $ 75,000 $ - $ 140,000 - $ $ 215,000 102 Parks Maintenance Compact Pickup $ - $ - $ - $ 65,000 $ - $ - $ 65,000 103 Parks Maintenance Compact Pickup $ - $ - $ 65,000 $ - $ - $ - $ 65,000 104 Parks Maintenance Trailers $ - $ - $ 15,000 $ - $ - $ - $ 15,000 105 PW Maintenance Supervisor Vehicle $ - $ 50,000 $ - $ - $ - $ 50,000 $ 50,000 106 Stormwater Compact Pickup $ - $ - $ - $ - $ 50,000 $ - $ 50,000 107 Stormwater Hydro cleaner $ 630,000 $ - $ - $ - $ 630,000 - $ $ 630,000 108 Streets Maint HD Air Brake Trailer $ - $ 55,000 $ 55,000 $ - $ - $ 55,000 $ 110,000 109 Streets Maint Compact Pickup $ - $ - $ - $ 70,000 $ - $ - $ 70,000 110 Streets Maint HD Roll-Off Truck $ - $ - $ - $ - $ 350,000 $ 350,000 - $ 111 Streets Maint Paver $ - $ - $ - $ 250,000 $ - $ 250,000 - $ 112 Streets Maintenance 3/4 ton Pickup F150 electric/hybrid $ - $ - $ - $ 70,000 $ - $ - $ 70,000 113 Streets Maintenance Backhoe $ - $ - $ 250,000 $ - $ - $ 250,000 - $ 114 Streets Maintenance Compact Pickup - Replace w/ Van $ - $ - $ - $ - $ 50,000 $ - $ 50,000 115 Streets Maintenance Roller $ - $ - $ - $ 100,000 $ - $ 100,000 - $ 116 Streets Maintenance Trailers $ - $ 25,000 $ - $ - $ - $ 25,000 $ 25,000 117 Streets- Sweeper $ - $ - $ - $ - $ 800,000 $ 800,000 - $ 118 Supplies, Software and Tools $ 100,000 $ - $ - $ - $ 100,000 - $ $ 100,000 119 Urban Forest Compact Pickup Escape Hyb AWD for Arborist $ - $ - $ - $ 60,000 $ - $ - $ 60,000 Table 69 (continued):

Financial Plan Page 364

Page 792 of 970 ends

Capital Improvement Program 2023-25
ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 120 18 Water Storage Tank Major Maintenance $ 755,000 $ 1,000,000 $ 127,000 $ 1,100,000 $ 1,100,000 $ 1,755,000 $ 4,082,000 121 Edna Tank Recoating $ 80,000 $ 1,000,000 $ - $ - $ - $ 1,080,000 $ 1,080,000 122 Reservoir 2 Cover Replacement $ 200,000 $ - $ - $ - $ - $ 200,000 $ 200,000 123 Wash water tank #1 $ 475,000 $ - $ - $ - $ - $ 475,000 $ 475,000 124 Water Storage Tank Maintenance $ - $ - $ 127,000 $ 1,100,000 $ 1,100,000 $ - $ 2,327,000 125 19 General Parking Structure Maintenance $ 700,000 $ 700,000 $ 1,000,000 $ 1,100,000 $ 1,100,000 $ 1,400,000 $ 4,600,000 126 20 Water Treatment Plant - Building Maintenance $ 650,000 $ - $ - $ - $ - $ 650,000 $ 650,000 127 21 Park Major Maintenance & Repairs $ 520,000 $ 440,000 $ 710,000 $ 1,410,000 $ 1,117,500 $ 960,000 $ 4,197,500 128 ADA Transition Plan Implementation $ - $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 80,000 129 Concrete Bench & Table Replacement Various Locations $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 30,000 $ 75,000 130 Devaul Basketball Court Replacement $ - $ - $ - $ - $ 15,000 $ - $ 15,000 131 Irrigation Mainline Leak Repair $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 70,000 $ 175,000 132 Islay Park flatwork replacement $ - $ - $ - $ 40,000 $ - $ - $ 40,000 133 Jack House Arbor $ 175,000 $ - $ - $ - $ - $ 175,000 $ 175,000 134 Johnson Park sidewalk and tree replacement $ - $ - $ - $ 100,000 $ - $ - $ 100,000 135 Johnson Park Sidewalk Replacement $ - $ - $ - $ 75,000 $ - $ - $ 75,000 136 Laguna Lake Docks and Ramp $ - $ - $ 100,000 $ - $ - $ - $ 100,000 137 Landscape Controller System Upgrade to Cal sense $ - $ 150,000 $ - $ - $ - $ 150,000 $ 150,000 138 Madonna Road Landscaping and Irrigation Replacement $ 50,000 $ - $ 300,000 $ - $ - $ 50,000 $ 350,000 139 Master Valve and Flow Sensing Installations $ 100,000 $ - $ - $ - $ - $ 100,000 $ 100,000 140 Meadow Park Exercise/Par Course Equipment Replacement $ - $ - $ - $ - $ 200,000 $ - $ 200,000 141 Mission Plaza Railing Upgrade $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 70,000 $ 175,000 142 Mitchell Park Replacement Restroom Doors $ - $ - $ - $ 100,000 $ - $ - $ 100,000 143 Parks Play Surfacing $ 80,000 $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 140,000 $ 320,000 144 Santa Rosa Barbecue Replacements $ - $ - $ 40,000 $ - $ - $ - $ 40,000 145 Santa Rosa Park Monument Sign $ - $ 20,000 $ 75,000 $ - $ - $ 20,000 $ 95,000 146 Sinsheimer Hillside turf (5 year cycle) $ - $ - $ - $ 75,000 $ - $ - $ 75,000 147 Sinsheimer outfield wall replacement $ - $ - $ - $ 75,000 $ - $ - $ 75,000 148 Sinsheimer Playground Turf and Soft Surface Replacement $ - $ - $ - $ - $ 7,500 $ - $ 7,500 149 Sinsheimer Stadium Bleachers $ - $ - $ - $ 100,000 $ 700,000 $ - $ 800,000 150 Sinsheimer Stadium Fencing $ - $ - $ - $ 50,000 $ - $ - $ 50,000 151 Sinsheimer Stadium Lighting Addition $ - $ 75,000 $ - $ 600,000 $ - $ 75,000 $ 675,000 152 Water Stations and Supply Lines $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 60,000 $ 150,000 153 22 ATP - South/King Crossing $ 500,000 $ - $ - $ - $ - $ 500,000 $ 500,000 154 23 California & Taft Roundabout $ 500,000 $ - $ 3,022,000 $ - $ - $ 500,000 $ 3,522,000 155 24 Development Related Park Improvements $ 500,000 $ 5,423,642 $ 250,000 $ - $ - $ 5,923,642 $ 6,173,642 156 Orcutt Area - Linear Park $ 500,000 $ - $ - $ - $ - $ 500,000 $ 500,000 157 Orcutt Area - Neighborhood Park $ - $ 5,423,642 $ - $ - $ - $ 5,423,642 $ 5,423,642 158 Orcutt Area - Pocket Park $ - $ - $ 250,000 $ - $ - $ - $ 250,000 159 25 Active Transportation Plan Implementation $ 435,000 $ 550,000 $ 520,000 $ 2,400,000 $ 2,400,000 $ 985,000 $ 6,305,000 160 Active Transportation Plan Tier 1 Network Implementation $ 50,000 $ 50,000 $ 100,000 $ 2,000,000 $ 2,000,000 $ 100,000 $ 4,200,000 161 Area Sealing Projects Complete Street Components $ 285,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 485,000 $ 1,085,000 162 Bicycle Facility Improvements $ 55,000 $ 150,000 $ 100,000 $ 100,000 $ 100,000 $ 205,000 $ 505,000 163 Bikeshare System Implementation $ - $ - $ 20,000 $ - $ - $ - $ 20,000 164 Pedestrian Facility Improvements $ 45,000 $ 150,000 $ 100,000 $ 100,000 $ 100,000 $ 195,000 $ 495,000 165 26 Urban Forest Maintenance $ 420,000 $ 440,000 $ 450,000 $ 450,000 $ 450,000 $ 860,000 $ 2,210,000 166 27 Water Meters and Boxes $ 335,000 $ 343,000 $ 350,000 $ 350,000 $ 350,000 $ 678,000 $ 1,728,000 167 28 Parking Enforcement Equipment at Gate Entry $ 300,000 $ - $ - $ - $ - $ 300,000 $ 300,000 168 29
ATP - Railroad Safety Trail (Orcutt to Tiburon) and Bullock Culvert Replacement $ 300,000 $ 100,000 $ 2,000,000 $ - $ 400,000 - $ $ 2,400,000 169 30 Parking Lot Maintenance $ 285,000 $ 745,000 $ 515,000 $ 1,330,000 $ 615,000 $ 1,030,000 $ 3,490,000 170 Damon Garcia Sports Field Complex $ - $ 130,000 $ - $ - $ 130,000 - $ $ 130,000 171 Fire Station 2 $ 50,000 $ - $ - $ - $ - $ 50,000 $ 50,000 172 Johnson Park $ - $ 50,000 $ - $ - $ - $ 50,000 $ 50,000 173 Laguna Lake $ - $ - $ 75,000 $ 1,250,000 $ - $ 1,325,000 - $ 174 Laguna Lake Golf Course $ - $ - $ - $ - $ 25,000 $ - $ 25,000 175 Ludwick Community Center $ - $ 10,000 $ 400,000 $ - $ - $ 10,000 $ 410,000 176 Meadow Park $ 175,000 $ - $ - $ - $ 175,000 - $ $ 175,000 177 Minor Repair of City Parking Lots $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 80,000 $ 200,000 178 Mitchell Park and SLO Senior Citizens Center $ 10,000 $ 35,000 $ - $ - $ - $ 45,000 $ 45,000 179 New parking lot Maintenance Projects $ - $ - $ - $ - $ 200,000 $ 200,000 - $ 180 Santa Rosa Park $ - $ 400,000 $ - $ - $ 400,000 - $ $ 400,000 181 Sinsheimer Park $ - $ - $ - $ 40,000 $ 350,000 $ 390,000 - $ 182 Throop Park $ 10,000 $ 80,000 $ - $ - $ - $ 90,000 $ 90,000 183 31 Water Utility Trench Repair $ 280,000 $ 280,000 $ 280,000 $ 280,000 $ 280,000 $ 560,000 $ 1,400,000 184 32 Water Valve Cover Adjustments $ 276,000 $ 35,000 $ 35,000 $ 35,000 $ 35,000 $ 311,000 $ 416,000 185 33 Sewer-main Replacement: Morro, Mill, Santa Rosa, and Chorro $ 253,000 $ - $ - $ - $ 253,000 - $ $ 253,000 186 34 Water Distribution System - Point Repairs $ 250,000 $ - $ 250,000 $ - $ 250,000 $ 250,000 $ 750,000 Table 69 (continued)
Financial Plan Page 365

Page 793 of 970 ends

Capital Improvement Program 2023-25
ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 187 35 Water Treatment Plant – Asset Replacement $ 245,000 $ 115,000 $ 145,000 $ 45,000 $ 140,000 $ 360,000 $ 690,000 188 Actiflo Poly Blend Units $ 75,000 $ - $ - $ - $ - $ 75,000 $ 75,000 189 Chlorine Metering Pump Skid at Chemical Feed Room $ 50,000 $ - $ - $ - $ - $ 50,000 $ 50,000 190 Cityworks Integration (water) $ - $ 90,000 $ - $ - $ - $ 90,000 $ 90,000 191 Contact Basin Drain Repair - Ozone System $ - $ - $ - $ - $ 95,000 $ - $ 95,000 192 Package Thickener $ - $ 25,000 $ 100,000 $ - $ - $ 25,000 $ 125,000 193 Pipe Gallery Coatings $ - $ - $ 45,000 $ - $ - $ - $ 45,000 194 Purchase Spare TPS pump, motor, and VFD $ 120,000 $ - $ - $ - $ - $ 120,000 $ 120,000 195 Water Treatment Plant - Facility Asset Replacement $ - $ - $ - $ 45,000 $ 45,000 $ - $ 90,000 196 36
Waterline Replacement: Santa Rosa - Stenner Creek Road to Highland 30-inch Pipeline $ 230,000 $ 8,230,000 - $ $ - $ 230,000 - $ $ 8,460,000 197 37 Annual Public Art Maintenance and Projects $ 225,000 $ 200,000 $ 100,000 $ 100,000 $ 100,000 $ 425,000 $ 725,000 198 Public Art Annual Asset Maintenance $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 60,000 $ 150,000 199 Small Public Art Projects $ 175,000 $ 150,000 $ 50,000 $ 50,000 $ 50,000 $ 325,000 $ 475,000 200 Utility Box Beautify $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 40,000 $ 100,000 201 38 Fleet Replacement: Utilities $ 220,000 $ 150,000 $ 948,772 $ 87,500 $ 1,568,000 $ 370,000 $ 2,974,272 202 Fleet Services Vehicle Lift $ - $ - $ - $ - $ 3,000 $ - $ 3,000 203 879 Administration Prius $ - $ - $ 40,000 $ - $ - $ - $ 40,000 204 Boat Trailer $ - $ - $ - $ 7,500 $ - $ - $ 7,500
205 Environmental Compliance - Pickup $ - $ - $ - $ - $ 70,000 $ - $ 70,000 206 Environmental Compliance - Sedan $ - $ - $ - $ 40,000 $ - $ - $ 40,000 207 Fleet - 4x4 3/4 Ton Truck w/Utility Box & Crane $ - $ - $ 75,000 $ - $ - $ - $ 75,000 208 Fleet - 4x4 SUV - Jeep $ - $ - $ 60,000 $ - $ - $ - $ 60,000 209 Fleet - Boston Whaler $ - $ - $ - $ 40,000 $ - $ - $ 40,000 210 Fleet - F150 4x4 Pick-up $ - $ - $ 76,572 $ - $ - $ - $ 76,572 211 Fleet Services Vehicle Lift $ - $ - $ 2,200 $ - $ - $ - $ 2,200 212 Sewer WRRF Compact Pickup $ - $ - $ - $ - $ 60,000 $ - $ 60,000 213 Sewer WWCL Portable Pump $ 85,000 $ - $ - $ - $ - $ 85,000 $ 85,000 214 Waste Water Collections Dump Truck $ - $ - $ - $ - $ 250,000 $ 250,000 - $ 215 Wastewater Collections Caterpillar Excavator $ - $ - $ - $ - $ 70,000 $ - $ 70,000 216 Water Distribution Backhoe $ - $ - $ - $ - $ 250,000 $ 250,000 - $ 217 Water Distribution Compact pickup $ - $ - $ 60,000 $ - $ - $ - $ 60,000 218 Water Distribution Compact Pickups $ - $ - $ 120,000 $ - $ - $ 120,000 - $ 219 Water Distribution Message Board $ - $ - $ - $ - $ 40,000 $ - $ 40,000 220 Water Distribution Pickup $ - $ - $ - $ - $ 70,000 $ - $ 70,000 221 Water Distribution Service Truck $ - $ - $ 500,000 $ - $ - $ 500,000 - $ 222 Water Distribution Service Truck $ - $ - $ - $ - $ 375,000 $ 375,000 - $ 223 Water Distribution Skid Loader $ - $ - $ - $ - $ 60,000 $ - $ 60,000 224 Water Distribution Trailer $ - $ - $ 15,000 $ - $ - $ - $ 15,000 225 Water Distribution Valve turning trailer $ - $ 150,000 $ - $ - $ 150,000 - $ $ 150,000 226 Whale Rock Utility Tractor $ 75,000 $ - $ - $ - $ - $ 75,000 $ 75,000 227 WRRF Utility Carts $ - $ - $ - $ - $ 165,000 $ 165,000 - $ 228 WTP 1/2 ton Crew Cab 4X4 Pickup $ - $ - $ - $ - $ 75,000 $ - $ 75,000 229 WTP Compact Pickup $ 60,000 $ - $ - $ - $ - $ 60,000 $ 60,000 230 WWC Pickup $ - $ - $ - $ - $ 80,000 $ - $ 80,000
231 39 Emerson Park Amenity Upgrades and Beautification $ 200,000 $ - $ - $ - $ 200,000 - $ $ 200,000 232 40 Fire Station 3&4 Remodel Space Study and Design $ 200,000 $ 1,000,000 - $ $ - $ 200,000 - $ $ 1,200,000 233 41 ATP - Foothill Boulevard Complete Street Project $ 200,000 $ 2,400,000 - $ $ - $ 200,000 - $ $ 2,600,000 234 42 ATP - Orcutt Road Railroad Crossing Upgrades $ 200,000 $ - $ 500,000 $ - $ 200,000 - $ $ 700,000 235 43 Sewer Lift Station Maintenance $ 200,000 $ - $ 80,000 $ - $ 80,000 $ 200,000 $ 360,000 236 44 Development Agreement - City Share $ 200,000 $ - $ 850,000 $ 560,000 $ 2,300,000 $ 200,000 $ 3,910,000 237 45 Pismo Street Retaining Wall - Storm Response $ 200,000 $ 1,700,000 - $ $ - $ 200,000 - $ $ 1,900,000 238 46 Water Treatment Plant - Major Equipment Maintenance $ 189,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 369,000 $ 909,000 239 Chemical System Maintenance $ 33,000 $ - $ - $ - $ - $ 33,000 $ 33,000 240 Ozone System Maintenance $ 156,000 $ - $ - $ - $ 156,000 - $ $ 156,000 241 WTP Major Maintenance $ - $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 720,000 242 47 Sewer Maintenance Cover Adjustments $ 180,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 210,000 $ 300,000 243 48 Higuera St. Widening - Bridge to Elks $ 180,000 $ - $ - $ - $ 180,000 - $ $ 180,000 244 49 Electric Vehicle Charging Station at Various Facilities $ 175,000 $ 100,000 $ 150,000 $ 150,000 $ 150,000 $ 275,000 $ 725,000 245 50 Open Space Acquisition $ 175,000 $ 150,000 $ 250,000 $ 150,000 $ 150,000 $ 325,000 $ 875,000 246 51 Open Space Maintenance $ 170,000 $ 170,000 $ 170,000 $ 170,000 $ 320,000 $ 340,000 $ 1,000,000 247 General Open Space Maintenance $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 240,000 $ 600,000 248 Open Space Climate-Informed Maintenance $ - $ - $ - $ - $ 150,000 $ 150,000 - $ 249 Open Space Fencing $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 100,000 $ 250,000 250 52 Bridge Preventative Maintenance $ 150,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 350,000 $ 950,000 251 53 Salinas Reservoir Transfer of Ownership Plan $ 150,000 $ - $ - $ - $ 150,000 - $ $ 150,000 252 54 Silt Removal $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 300,000 $ 750,000 253 55 WRRF Power Cogeneration Upgrade $ 150,000 $ 1,475,000 - $ $ - $ 150,000 - $ $ 1,625,000 254 56 WRRF - Building Maintenance $ 150,000 $ - $ 825,000 $ - $ 150,000 - $ $ 975,000 255 Lab Admin HVAC $ - $ - $ 75,000 $ - $ - $ - $ 75,000 256 WRRF - Building Maintenance $ 150,000 $ - $ 750,000 $ - $ 150,000 - $ $ 900,000 Table 69 (continued)
Financial Plan Page 366

Page 794 of 970 ends

Capital Improvement Program 2023-25
ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 257 57 Vision Zero Program Implementation $ 140,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 260,000 $ 620,000 258 58 Pedestrian and Bicycle Pathway Maintenance $ 125,000 $ 435,000 $ 365,000 $ 400,000 $ 300,000 $ 560,000 $ 1,625,000 259 Andrews and Johnson Bike Path $ - $ 10,000 $ 65,000 $ - $ - $ 10,000 $ 75,000 260 Brookpine and Spanish Oaks Trail $ - $ - $ - $ 250,000 $ - $ - $ 250,000 261 Pathway Maintenance Various Locations $ 125,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 275,000 $ 725,000 262 Pavement Area 2 & 3 Bike Path Sealing $ - $ - $ - $ - $ 150,000 $ - $ 150,000 263 Railroad Safety Trail $ - $ 275,000 $ 150,000 $ - $ - $ 275,000 $ 425,000 264 59 Wastewater Collections System - Point Repairs $ 120,000 $ - $ 120,000 $ - $ 120,000 $ 120,000 $ 360,000 265 60 Sidewalk Replacement and Installation $ 100,000 $ 150,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,000,000 266 Curb Ramps and Sidewalks $ 50,000 $ 100,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000 267 Street Tree Sidewalks $ 50,000 $ 50,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 400,000 268 61
Waterline Replacement: Chorro - Highland to Meinecke 24-inch Pipeline Replacement $ 100,000 $ 1,900,000 $ - $ - $ - $ 2,000,000 $ 2,000,000 269 62 871 Marsh Street Structure Maintenance $ 100,000 $ - $ - $ - $ - $ 100,000 $ 100,000 270 63 Roundabout Public Art Installations $ 100,000 $ 100,000 $ 100,000 $ 200,000 $ 200,000 $ 200,000 $ 700,000 271 64 842 Palm Parking Structure Maintenance $ 100,000 $ - $ - $ - $ - $ 100,000 $ 100,000 272 65 License Plate Recognition Replacement $ 97,000 $ - $ - $ - $ - $ 97,000 $ 97,000 273 66 Bus Shelter Replacements $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 180,000 $ 450,000 274 67 Street Lights - Annual Asset Maintenance $ 75,000 $ 75,000 $ 75,000 $ 80,000 $ 80,000 $ 150,000 $ 385,000 275 68 Fleet Replacement: Parks and Recreation $ 75,000 $ - $ 70,000 $ 80,000 $ 85,000 $ 75,000 $ 310,000 276 Golf Course Mower $ - $ - $ - $ 80,000 $ - $ - $ 80,000 277 Parks and Rec Admin Compact Pickup $ - $ - $ 70,000 $ - $ - $ - $ 70,000 278 Parks- Mower $ - $ - $ - $ - $ 85,000 $ - $ 85,000
279 Parks Tractor Attachments $ 75,000 $ - $ - $ - $ - $ 75,000 $ 75,000 280 69 Traffic Signs & Striping Maintenance $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 150,000 $ 375,000 281 70 Sewer Lift Station Replacement - Silver City $ 70,000 $ 100,000 $ 1,980,000 $ - $ - $ 170,000 $ 2,150,000 282 71 Whale Rock Reservoir - Asset Replacement $ 67,542 $ 128,923 $ 45,398 $ 20,000 $ 220,000 $ 196,465 $ 481,863 283 Evaporation/Weather Stations $ - $ - $ 25,398 $ - $ - $ - $ 25,398 284 Replacement of Piezometers $ - $ 108,923 $ - $ - $ - $ 108,923 $ 108,923 285 Reservoir Fencing $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 40,000 $ 100,000 286 Stilling Basin $ 47,542 $ - $ - $ - $ - $ 47,542 $ 47,542 287 Valve Replacements $ - $ - $ - $ - $ 200,000 $ - $ 200,000 288 72 Fire Hydrants $ 55,000 $ 55,000 $ 55,000 $ 55,000 $ 55,000 $ 110,000 $ 275,000 289 73 Transportation Monitoring & Modeling Update $ 55,000 $ 55,000 $ 55,000 $ 55,000 $ 55,000 $ 110,000 $ 275,000 290 74 Whale Rock Transmission Pipeline Replacement $ 51,000 $ - $ 60,000 $ 510,000 $ 550,300 $ 51,000 $ 1,171,300 291 75 Waterline Abandonment & Connections $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 100,000 $ 250,000 292 76 Neighborhood Traffic Improvements $ 45,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 75,000 $ 165,000 293 77 Banner Arms, Bench Arm Rests, Signs $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 50,000 $ 125,000 294 78 Sewer Utility Trench Repair $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 50,000 $ 125,000 295 79
Sewer-main Replacement: Serrano, Bressi, Dana and Higuera Pipeline Replacement $ 25,000 $ 1,275,000 $ - $ - $ 1,300,000 - $ $ 1,300,000 296 80 Laguna Lake Golf Course Maintenance $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 40,000 $ 100,000 297 81 Water Treatment Plant - Water Meter Replacement $ 10,000 $ 30,000 $ 54,800 $ - $ - $ 40,000 $ 94,800 298 Drying Bed Meters $ - $ - $ 4,800 $ - $ - $ - $ 4,800 299 Salinas Water Meter $ - $ - $ 50,000 $ - $ - $ - $ 50,000 300 Water Treatment Plant - Water Meter Replacement $ 10,000 $ 30,000 $ - $ - $ - $ 40,000 $ 40,000 301 82 Buchon-Santa Rosa Intersection Improvements $ - $ - $ 100,000 $ - $ - -$ 100,000 $ 302 83 Sustainable Groundwater Management Act GSP $ - $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000 303 84 Parking Lot Maintenance - Bus Yard $ - $ 25,000 $ 500,000 $ - $ - $ 25,000 $ 525,000 304 85 WRRF - Demolish Old Effluent Structure $ - $ - $ - $ 50,000 $ 495,000 -$ 545,000 $ 305 86 Dalidio Drive Access Improvements $ - $ - $ - $ 25,000 $ 75,000 -$ 100,000 $ 306 87 WRRF Asset Replacement $ - $ 125,000 $ 125,000 $ 75,000 $ 200,000 $ 125,000 $ 525,000 307 Coating Maintenance $ - $ - $ - $ 25,000 $ - $ - $ 25,000 308 Existing Cogen Maintenance (M7) $ - $ - $ - $ - $ 150,000 $ 150,000 - $ 309 Rebuild Influent Storm Pumps $ - $ 75,000 $ 75,000 $ - $ - $ 75,000 $ 150,000 310 UV Bulb Replacement (annual replacement) $ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 200,000 311 88 Waterline Replacement: Highland at UPRR and Cal Poly $ - $ - $ - $ 850,000 $ - -$ 850,000 $ 312 89 Emily Street Extension $ - $ - $ - $ - $ 200,000 -$ 200,000 $ 313 90 Prado Road Bridge & Road Widening $ 18,373,000 - $ $ 7,750,000 $ - $ 18,373,000 - $ $ 26,123,000 314 91 Major Facility Replacements $ - $ 350,000 $ 1,040,000 $ 3,100,000 $ 3,500,000 $ 350,000 $ 7,990,000 315 Corporation Yard TI $ - $ - $ 40,000 $ 1,500,000 $ - $ 1,540,000 - $ 316 Debt Service - PD Replacement $ - $ - $ - $ 3,500,000 - $ $ 3,500,000 - $ 317 Police Building Stop-Gap Improvements $ - $ - $ - $ 600,000 $ - $ 600,000 - $ 318 Police Station Replacement $ - $ 350,000 $ 1,000,000 $ 1,000,000 $ 350,000 - $ $ 2,350,000 319 92 Downtown Transit Center Rehabilitation (Transit Fund) $ - $ - $ - $ 140,000 $ 1,500,000 -$ 1,640,000 $ 320 93 Climate Action Plan Support - Carshare Program $ - $ - $ - $ - $ 115,000 -$ 115,000 $ 321 94 Sewer Inflow/Infiltration Reduction $ - $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,000,000 322 95 Water Storage Tank Inspection and Cleaning $ - $ - $ - $ 50,000 $ 250,000 -$ 300,000 $ 323 96 Laguna Lake Golf Course Irrigation Improvements $ - $ - $ - $ - $ 300,000 -$ 300,000 $ 324 97 Lead by Example $ - $ 100,000 $ 78,000 $ 765,000 $ 570,000 $ 100,000 $ 1,513,000 325 Building Electrification - City Hall Heat Pump $ - $ - $ 78,000 $ - $ 518,000 $ 596,000 - $ 326 Building Electrification - Swim Center Heat Pump $ - $ 100,000 $ - $ 765,000 $ 100,000 - $ $ 865,000 327 Fire Station 1 Electrification $ - $ - $ - $ - $ 52,000 $ - $ 52,000 Table 69 (continued)
Financial Plan Page 367

Page 795 of 970 ends

Capital Improvement Program 2023-25
ID CIP # Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals 328 98 Waterline Replacement: Patricia, Highland, and La Entrada $ - $ - $ - $ 127,000 $ 1,397,000 $ - $ 1,524,000 329 99 City Hall Exterior Lighting $ - $ - $ 50,000 $ 200,000 $ - $ - $ 250,000 330 100 Old Garden Creek Retaining Wall $ - $ - $ 175,000 $ - $ 800,000 $ - $ 975,000 331 101 Fleet Replacement: Police $ - $ 90,000 $ 350,000 $ 482,000 $ 1,201,500 $ 90,000 $ 2,123,500 332 Admin Sedan $ - $ - $ - $ - $ 45,000 $ - $ 45,000
333 Communications Lieutenant Vehicle $ - $ - $ - $ 62,000 $ - $ - $ 62,000 334 FST Maverick $ - $ - $ - $ 65,000 $ - $ - $ 65,000
335 Investigations Sedan $ - $ - $ - $ - $ 60,000 $ - $ 60,000 336 Investigations Sedan $ - $ - $ - $ - $ 60,000 $ - $ 60,000 337 Investigations SUV $ - $ - $ - $ 65,000 $ - $ - $ 65,000 338 Police FST Truck $ - $ - $ - $ - $ 70,000 $ - $ 70,000 339 Police Investigations Enclosed Trailer $ - $ - $ - $ - $ 25,000 $ - $ 25,000 340 Police Investigations Sedan $ - $ - $ 40,000 $ - $ - $ - $ 40,000 341 Police Motorcycles $ - $ 20,000 $ 40,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 342 Police Patrol Electric SUV $ - $ - $ 150,000 $ 150,000 $ 170,000 $ - $ 470,000 343 Police Patrol Hybrid SUV $ - $ 70,000 $ 120,000 $ 120,000 $ 120,000 $ 70,000 $ 430,000 344 Public Safety Mobile Command Vehicle/City EOC $ - $ - $ - $ - $ 550,000 $ - $ 550,000 345 Truck to tow the Mobile Command Trailer $ - $ - $ - $ - $ 81,500 $ - $ 81,500 346 102 Sewer-main Replacement: Bee Bee - South Street to Sandercock $ - $ - $ - $ 400,000 $ - $ - $ 400,000 347 103 T-3 Water Storage Tank Replacement - High Pressure Zone $ - $ 900,000 $ 500,000 $ - $ - $ 900,000 $ 1,400,000 348 104 Sewer-main Replacement: Broad, Murray, and Chorro $ - $ - $ - $ - $ 145,000 $ - $ 145,000 349 105
Sewer-main Replacement: Buchon - Morro to Johnson Pipeline Replacement $ - $ - $ - $ 135,000 $ 2,485,000 $ - $ 2,620,000 350 106 Downtown Zig-Zag Lighting $ - $ - $ - $ 1,100,000 $ - $ - $ 1,100,000 351 107 Sewer-main Replacement: Chorro - Boysen to Rougeot $ - $ 250,000 $ 2,750,000 $ - $ - $ 250,000 $ 3,000,000 352 108 Sewer-main Replacement: Foothill Siphon $ - $ - $ 200,000 $ 250,000 $ 2,750,000 $ - $ 3,200,000 353 109 Parking Pay Station Installation $ - $ 600,000 $ 600,000 $ 600,000 $ - $ 600,000 $ 1,800,000 354 110 Fire Station 4 Metal Building Gym Space $ - $ - $ 200,000 $ - $ - $ - $ 200,000 355 111 Corporation Yard Perimeter Fence Replacement $ - $ - $ 550,000 $ - $ - $ - $ 550,000 356 112
Sewer-main Replacement: San Jose, Ramona, Monte Vista, and California $ - $ 1,225,000 $ - $ - $ - $ 1,225,000 $ 1,225,000 357 113
Laguna Lake Dredging and Sediment Management Project
Implementation $ - $ 900,000 $ - $ 900,000 $ 900,000 - $ $ 1,800,000 358 114 Fleet Replacement: Admin $ - $ 250,000 $ 175,000 $ 50,000 $ 50,000 $ 250,000 $ 525,000 359 City Hall Generator (GEN-9712) $ - $ 125,000 $ 125,000 $ - $ 125,000 - $ $ 250,000 360 Community EV Charging $ - $ - $ 50,000 $ 50,000 $ 50,000 $ 150,000 - $ 361 Downtown Cleaning Equipment $ - $ 125,000 $ - $ - $ 125,000 - $ $ 125,000 362 115 SLO Creek Walk Maintenance - Lighting, Signage, Irrigation, Plants $ - $ 250,000 $ - $ 250,000 $ 250,000 - $ $ 500,000 363 116 Playground Equipment Replacement $ - $ 1,100,000 - $ $ 1,100,000 $ 1,600,000 -$ 3,800,000 $ 364 Anholm Playground Equipment Replacement $ - $ - $ - $ 100,000 $ 500,000 $ 600,000 - $ 365 DeVaul Ranch Playground $ - $ - $ 500,000 $ - $ - $ 500,000 - $ 366 French Park Playground Equipment Replacement $ - $ - $ - $ - $ 150,000 $ 150,000 - $ 367 Laguna Hills Playground $ - $ - $ 100,000 $ 950,000 $ - $ 1,050,000 - $ 368 Mitchell Park Playground $ - $ - $ - $ 50,000 $ 950,000 $ 1,000,000 - $ 369 Vista Lago Mini Park Playground $ - $ - $ 500,000 $ - $ - $ 500,000 - $ 370 117 Source Water Strategic Plan $ - $ 90,000 $ - $ - $ - $ 90,000 $ 90,000 371 118 Waterline Replacement: Rockview - Stoneridge to Broad $ - $ - $ 130,000 $ 1,530,000 $ - -$ 1,660,000 $ 372 119 South Street Median Landscaping $ - $ - $ 550,000 $ - $ - -$ 550,000 $ 373 120 Waterline Replacement: Stenner Canyon at Reservoir $ - $ - $ 80,000 $ 1,100,000 $ - -$ 1,180,000 $ 374 121 Whale Rock Pump Station Electrical Repairs (A and B) $ 1,960,620 - $ $ - $ - $ 1,960,620 - $ $ 1,960,620 375 122 Downtown Renewal $ - $ 200,000 $ 2,000,000 - $ $ 200,000 - $ $ 2,200,000 376 123 Recycled Waterline at Orcutt Street - Fernwood to Laurel $ - $ 25,000 $ 675,000 $ - $ - $ 25,000 $ 700,000 377 124 WRRF Asset Replacement - Screw Press $ - $ - $ - $ 200,000 $ 3,360,000 -$ 3,560,000 $ 378 125 Recycled Waterline at Tank Farm - Long to Innovation Pipeline $ - $ - $ - $ 25,000 $ 625,000 -$ 650,000 $ 379 126 Recycled Water Annual UV Bulb Replacement $ - $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 40,000 380 127 WTP - Filter Media Replacement and Underdrain Repairs $ - $ - $ 60,000 $ 60,000 $ 250,000 -$ 370,000 $ 381 128 Recycled Water Pump Station Maintenance $ - $ 60,000 $ - $ - $ - $ 60,000 $ 60,000 382 129 Recycled Water Storage Tank $ - $ - $ - $ - $ 20,000 -$ $ 20,000 383 CIP Reserve $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 4,000,000 $ 8,000,000 $ 20,000,000 384 Grand Total $ 116,020,168 $ 67,269,798 $ 162,576,880 $ 56,196,375 $ 62,979,945 $ 183,289,966 $ 465,043,165 Table 69 (continued)
Financial Plan Page 368

Page 796 of 970 ends

Capital Improvement Program 2023-25
How to Interpret Project Narrative Pages
Project Information
The project detail pages include the following information:

1. Project Number – Each project is assigned a unique identifier.

2. Project Classification Information – Describes the project’s function and classification, if it is tied to any other CIP projects, the community priority, and what type of project it is.

3. Purpose and Need – Describes the project’s purpose, details of the project elements and need for the project in the community.

4. Fiscal Years – Outlines the cost of the project over the span of five years and the total cost budget.

5. Fund & Funding Sources – Identifies the source(s) of project funding.

Financial Plan Page 369

Page 797 of 970 ends

Capital Improvement Plan
Project Number Project Name
90435 Cultural Arts District Parking Structure
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
The project includes the construction of a new parking structure at the intersection of Palm and Nipomo that will include approximately 396 parking spaces, two elevators, electric vehicle charging stations, an event space and viewing deck, safe bike parking, solar panels and other amenities to support the downtown community. The total project cost is currently estimated at $54.5 Million.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 47,000,000 1,500,000 490,000 0 0 48,990,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 1,500,000 490,000 0 0 1,990,000 611 - Parking Fund 47,000,000 0 0 0 0 47,000,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Bonds, Infrastructure Loan
(Debt) 47,000,000 0 0 0 0 47,000,000
General Capital Outlay 0 1,500,000 490,000 0 0 1,990,000 CIP# 1 Financial Plan Page 370

Page 798 of 970 ends

Capital Improvement Plan
Project Number Project Name
90649 Mid-Higuera Bypass
Project Classification Classification Description
CIP Project Function Community Safety
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Community Improvement
Project Type Asset Replacement
Purpose and Need
Due to historical encroachment into the San Luis Obispo creek channel between Marsh Street and Madonna Road, the creek channel is unable to provide sufficient capacity for flood events. This results in frequent flood damage as flood waters rise out of the creek channel and flow down Higuera Street. This project would reduce the frequency of this flooding by widening the creek at multiple pinch points along the project area, installing flood bypass channels within City open space and directing flood waters towards the creek channel at Matthews Open Space.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 8,729,000 2,850,000 0 0 0 11,579,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 8,729,000 2,850,000 0 0 0 11,579,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 1,250,000 2,850,000 0 0 0 4,100,000 State or Federal Grant 6,079,000 0 0 0 0 6,079,000
Zone 9 1,400,000 0 0 0 0 1,400,000
CIP# 2 Financial Plan Page 371

Page 799 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001057 ATP - Higuera Complete Street Project
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
This project includes complete street and active transportation safety improvements along the Higuera corridor between Marsh Street and Los Osos Valley Road, as well as bikeway enhancements on Madonna Road between Higuera Street and the US 101 SB Ramps, and neighborhood greenway improvements along Bridge Street/Corrida/Woodbridge Street east of Higuera. Improvements include buffered and protected bike lanes, bicycle and pedestrian crossing improvements, hi-visibility crosswalks, ADA curb ramp upgrades, speed reduction elements, and traffic signal upgrades.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 8,251,000 750,000 0 0 0 9,001,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 8,251,000 750,000 0 0 0 9,001,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 300,000 750,000 0 0 0 1,050,000
SLOCOG Grant 1,000,000 0 0 0 0 1,000,000
State or Federal Grant 6,951,000 0 0 0 0 6,951,000
CIP# 3 Financial Plan Page 372

Page 800 of 970 ends

Capital Improvement Plan
Project Number Project Name
90346 Street Reconstruction & Resurfacing
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Pavement maintenance is an ongoing need and provides increased roadway life and a smooth pavement surface. The City’s Pavement Management Plan (PMP), adopted in 1998, established nine pavement maintenance zones within the City, and a plan in which each of these areas received maintenance on an eight-year rotation. In 2009, the City Council approved a modified PMP that provided priority for arterial streets while maintaining the eight-year rotation for maintenance work on local streets. The City maintains a total of 134 miles of roadways. Identified projects are as follows:
2023 - Santa Barbara Ave, Monterey Street, California Blvd, La Loma Court, Palm Street, Morro Street 2024 - Areas 8 & 1 Local and Collector Streets, Johnson Avenue 2025 - Tank Farm, Orcutt Road
2026 – Areas 2 & 3 Local and Collector Streets
2027 – South Higuera, Los Osos Valley Road, Madonna
Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 6,956,994 5,000,000 7,514,000 6,000,000 9,000,000 34,470,994 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
211 - SB1 Road Repair
2017 1,177,994 1,092,000 1,114,000 1,136,000 1,158,720 5,678,714 401 - Capital Outlay Fund 5,779,000 2,908,000 6,400,000 3,864,000 7,841,280 28,792,280 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 5,779,000 3,908,000 6,400,000 4,864,000 7,841,280 28,792,280 SB1 1,177,994 1,092,000 1,114,000 1,136,000 1,158,720 5,678,714 CIP# 4 Financial Plan Page 373

Page 801 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000550
WRRF and Wastewater Collection
Maintenance Facility
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Public Facility
Project Type Asset Replacement
Purpose and Need
The City’s Water Resource Recovery Facility (WRRF) and Wastewater Collection’s maintenance shops are located near the intersection of Prado Road and Elks Lane. In 2017 the need to design and construct an overcrossing on Highway 101 was presented to Caltrans with anticipation of developing a work plan to complete environmental clearances, design, and construction. Since 2017, iterations of the overcrossing objectives and design requirements have required the footprint of the overcrossing to encroach into the sewer fund’s property. The encroachment will require demolition of the existing wastewater collection’s shop and re-routing of the Prado Road entrance. This project will look for opportunities to re-purpose existing building areas or develop new objectives for the design of a new maintenance shop. The project will be broken up into a study, design and environmental clearance, and construction phase. Additionally, the WRRF demolished the existing maintenance welding shop and storage facility to make room for the new digester and pumping facilities. The WRRF will need a maintenance shop with adequate storage and amenities to service the new facility in the next three years and eliminate the steel storage bins currently being used. This project will evaluate opportunities to merge the two maintenance shops under one footprint and review the section’s objectives to create efficiencies with one construction project to promote section efficiencies, enhance security to the WRRF, and improve circulation based on the intersection realignments proposed by the Highway 101 overcrossing project.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 6,500,000 0 0 0 0 6,500,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 6,500,000 0 0 0 0 6,500,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 6,500,000 0 0 0 0 6,500,000
CIP# 5 Financial Plan Page 374

Page 802 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000578
Waterline Replacement: Johnson - Iris to
Bishop
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The objective of the project is to replace a critical water transmission pipeline along Johnson Avenue from Iris to Bishop Street. The existing cast iron pipe has been deteriorating faster than anticipated and is need of replacement as a high priority project given this pipeline serves a major Hospital and other essential facilities along Johnson Avenue. The new pipeline will meet standards by the American Water Works Association (AWWA) that will provide resiliency in the distribution network against variations in pressure and flows for current and future developments.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 3,300,000 0 0 0 0 3,300,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 3,300,000 0 0 0 0 3,300,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 3,300,000 0 0 0 0 3,300,000
CIP# 6 Financial Plan Page 375

Page 803 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001027 Storm Response and Recovery
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City of SLO was struck with multiple storm events from Dec 2022 through March 2023, one of which was a federally declared major disaster. Staff are leading efforts to respond to the infrastructure damage caused by these events and mitigate future damage to the maximum extent feasible.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 2,750,000 0 0 0 0 2,750,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 2,750,000 0 0 0 0 2,750,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 2,750,000 0 0 0 0 2,750,000
CIP# 7 Financial Plan Page 376

Page 804 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000505 Bus Replacements with EV
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type Asset Replacement
Purpose and Need
Several SLO Transit vehicles are near the end of their useful life as defined by the Federal Transit Administration as 12 years of consecutive service. These vehicles are showing their age and experiencing reliability issues and require additional costly maintenance. This project will replace end of useful life diesel transit vehicles with new electric transit vehicles which is essential for the City to move closer towards meeting its Climate Action, Open Space, & Sustainable Transportation Plan goals of being carbon neutral by 2030 and the California Air Resource Board Innovative Clean Transit Rule for 100% transition to electric transit vehicles by 2040. Funding for transit vehicle replacements is contingent upon receipt of discretionary grant dollars.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 2,701,500 2,226,000 3,055,110 0 2,145,851 10,128,461 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
621 - Transit Fund 2,701,500 2,226,000 3,055,110 0 2,145,851 10,128,461 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total State or Federal Grant 2,701,500 2,226,000 3,055,110 0 2,145,851 10,128,461 CIP# 8 Financial Plan Page 377

Page 805 of 970 ends

Capital Improvement Plan
Project Number Project Name
91439 Mission Plaza Concept Plan Implementation
Project Classification Classification Description
CIP Project Function Community & Neighborhood Livability Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Community Improvement
Project Type Asset Replacement
Purpose and Need
The City of San Luis Obispo has completed and approved a Concept Plan for future improvements to the Mission Plaza. A major component of the Concept Plan is to replace the existing restroom and install a new Kiosk, this scope of work is currently being advanced as Phase #1 of the broader Mission Plaza Concept Plan implementation. This project also supports design and future construction of the primary plaza area between Chorro Street and Broad Street, identified as Phase #2, as well as design service for Phase #3, improvements to the Broad Street Dog-leg.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 2,429,972 470,028 100,000 6,000,000 4,000,000 13,000,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 2,429,972 470,028 100,000 6,000,000 4,000,000 13,000,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 2,354,302 0 0 0 0 2,354,302
Local Revenue Measure 75,670 470,028 100,000 6,000,000 4,000,000 10,645,698 CIP# 9 Financial Plan Page 378

Page 806 of 970 ends

Capital Improvement Plan
Project Number Project Name
90742 Storm Drain System Replacement
Project Classification Classification Description
CIP Project Function Community Safety
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This annual asset maintenance project addresses capital maintenance and replacement of pipes, culverts, and constructed drainage channels to provide increased flood protection and reduced likelihood of loss of property. Budget is used to address high priority maintenance and repair of pipes and culverts past their design life and at risk of failure, as well as emergency repairs.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,875,000 1,025,000 825,000 1,325,000 1,325,000 6,375,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 1,875,000 1,025,000 825,000 1,325,000 1,325,000 6,375,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 1,875,000 1,025,000 825,000 1,325,000 1,325,000 6,375,000 CIP# 10 Financial Plan Page 379

Page 807 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000535 Transit Facility EV Charging Infrastructure
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type Asset Replacement, New Asset
Purpose and Need
The State of California's Innovative Clean Fleet Rule requires transit agencies to convert to zero emission vehicles. This project is to build in the electric vehicle infrastructure needed to support the City's acquisition of electric transit buses.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,805,400 1,445,406 604,800 0 414,000 4,269,606 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
621 - Transit Fund 1,805,400 1,445,406 604,800 0 414,000 4,269,606 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total State or Federal Grant 1,805,400 1,445,406 604,800 0 414,000 4,269,606 CIP# 11 Financial Plan Page 380

Page 808 of 970 ends

Capital Improvement Plan
Project Number Project Name
91613 Prado Road Interchange
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Housing and Homelessness
Partnership Project Yes
Project Classification Transportation
Project Type New Asset
Purpose and Need
The existing interchange at Prado Road is at grade and cannot accommodate development needs within the City and region. Prado road will be extended across Hwy 101, and the North Bound on and off ramps will also be added to this raised interchange. Elks Lane will be re-routed and form a new intersection with the driveway to the City Corporation Yard and Water Resource Recovery Facility.

Corporation Yard assets will be re-organized to allow the interchange to be constructed. Prado Road will also be widened from Elks Lane to the Prado Creek Bridge. Grant Funding will be pursued during future design phases to help fund construction costs to the maximum extent possible.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,435,260 2,750,000 91,350,000 6,585,000 0 102,120,260 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 1,435,260 0 80,900,000 6,585,000 0 88,920,260 405 - Infrastructure Invest
CIP Fund 0 2,750,000 1,150,000 0 0 3,900,000
507 - Transportation Impact
Fee Fund 0 0 2,000,000 0 0 2,000,000
514 - SLR Transportation
Impact Fee Fund 0 0 7,300,000 0 0 7,300,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Bonds, Infrastructure Loan
(Debt) 0 0 74,900,000 0 0 74,900,000
Developer Contribution 0 0 7,300,000 0 0 7,300,000
Infrastructure Investment
Fund 0 2,750,000 1,150,000 0 0 3,900,000
Local Revenue Measure 0 0 0 6,585,000 0 6,585,000
San Luis Obispo County 1,435,260 0 0 0 0 1,435,260
SLOCOG Grant 0 0 6,000,000 0 0 6,000,000
Transportation Development
Impact Fee 0 0 2,000,000 0 0 2,000,000
CIP# 12 Financial Plan Page 381

Page 809 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000570
Sewer-main Replacements: Taft, Hathaway,
Phillips, Buena Vista, and Loomis
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Public Facility
Project Type Asset Replacement
Purpose and Need
The City’s wastewater collection system includes approximately 140 miles of sewer mains. Some pipes are over 100 years old, and are undersized to handle the current flow rates. Maintenance needs increase dramatically as pipelines reach their flow capacities, or when they approach the end of their useful life. Pipelines in the public wastewater collection system are inspected using specialized video equipment that will prioritize periodic cleaning frequencies or recommend a complete replacement. Based on the assessment, this project is needed for the replacement of sewer mains dating back to 1955 that make up potions of the backbone system crossing Highway 101 and have shown high infiltration flows rates during major storm events.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,225,000 0 0 0 0 1,225,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 1,225,000 0 0 0 0 1,225,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 1,225,000 0 0 0 0 1,225,000
CIP# 13 Financial Plan Page 382

Page 810 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000075 Major Facility Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Public Facility
Project Type
Annual Asset Maintenance, Asset
Replacement, New Asset
Purpose and Need
This project will maintain, upgrade, or replace City facilities that serve the community. Funding in this Financial Plan is intended to support the Corporation Yard Fuel Island Siding, Jack House Roof Repairs, and HVAC work at the Parking Services Office, among others.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,152,000 423,178 625,000 1,928,776 2,015,000 6,143,954 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 0 75,000 448,776 435,000 958,776 404 - Major Facility Repl
Fund 822,000 423,178 550,000 1,480,000 1,580,000 4,855,178 601 - Water Fund 50,000 0 0 0 0 50,000
602 - Sewer Fund 50,000 0 0 0 0 50,000
611 - Parking Fund 230,000 0 0 0 0 230,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 250,000 50,000 100,000 550,000 0 950,000 Local Revenue Measure 572,000 373,178 525,000 1,378,776 2,015,000 4,863,954 Parking Fund 230,000 0 0 0 0 230,000
Sewer Fund 50,000 0 0 0 0 50,000
Water Fund 50,000 0 0 0 0 50,000
CIP# 14 Financial Plan Page 383

Page 811 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000074 IT Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification IT
Project Type Annual Asset Maintenance
Purpose and Need
These projects replace Information Technology assets based upon equipment lifespan, condition, and organizational requirements.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 1,145,500 2,011,001 2,695,000 911,099 980,794 7,743,393 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
403 - Info Tech Repl Fund 1,019,028 1,596,656 2,575,784 888,176 926,270 7,005,913 601 - Water Fund 32,977 172,259 32,332 9,168 18,428 265,164 602 - Sewer Fund 54,343 179,806 34,641 9,168 25,524 303,482 611 - Parking Fund 27,961 32,467 31,665 2,292 7,612 101,996 621 - Transit Fund 10,566 8,268 10,719 2,295 2,961 34,808 705 - Whale Rock Fund 625 21,546 9,859 0 0 32,030
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total 150,000 150,000 0 0 0 300,000
General Capital Outlay 520,698 1,014,484 1,306,794 0 302,508 3,144,484 Local Revenue Measure 348,330 432,172 1,268,990 888,176 623,761 3,561,429 Parking Fund 27,961 32,467 31,665 2,292 7,612 101,996
Sewer Fund 54,343 179,806 34,641 9,168 25,524 303,482
Transit Fund 10,566 8,268 10,719 2,295 2,961 34,808
Water Fund 32,977 172,259 32,332 9,168 18,428 265,164
Whale Rock Fund 625 21,546 9,859 0 0 32,030
CIP# 15 Financial Plan Page 384

Page 812 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000526 Parks and Rec General Plan Implementation
Project Classification Classification Description
CIP Project Function Culture & Recreation
Major City Goal Other
Partnership Project No
Project Classification Community Improvement
Project Type New Asset
Purpose and Need
The Parks and Recreation Blueprint for the Future was approved in July 2021, funding was allocated to conduct focus groups and to begin project plans and scope for the immediate short-term (5 year) prioritized upgrades and new recreational features and amenity upgrades/replacements. e.g., Laguna Lake Dog Park, Bike Park, restroom enhancements at Sinsheimer Park.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 800,000 0 0 0 0 800,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
501 - Parkland Development
Fund 800,000 0 0 0 0 800,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parkland Development
Impact Fees 800,000 0 0 0 0 800,000
CIP# 16 Financial Plan Page 385

Page 813 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000520 Fleet Replacement: Public Works
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Fleet
Project Type
Annual Asset Maintenance, Asset
Replacement, New Asset
Purpose and Need
This funding replaces existing City vehicles in compliance with revised Fleet Replacement Guidelines. Revised Fleet Replacement Guidelines include the evaluation of the following criteria: Emission Compliance, Engine hours, Mileage, Age, Known Manufacture Problems, Repair Cost History, Utilization, and Fleet System Analytics. Additionally, the age and mileage replacement targets have been extended for all vehicle and equipment categories within the Fleet. New vehicle and equipment replacements are selected with the cleanest emissions systems possible that can be fueled and/or charged locally while meeting the end users' operational needs.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 770,000 395,000 612,000 1,110,000 1,385,000 4,272,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
402 - Fleet Repl Fund 730,000 345,000 612,000 1,110,000 1,385,000 4,182,000 611 - Parking Fund 40,000 50,000 0 0 0 90,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 0 75,000 0 75,000 135,000 285,000 Local Revenue Measure 730,000 270,000 612,000 1,035,000 1,250,000 3,897,000 Parking Fund 40,000 50,000 0 0 0 90,000
CIP# 17 Financial Plan Page 386

Page 814 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000034 Water Storage Tank Major Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Storage capacity for treated potable water is an essential function of a water distribution system to provide adequate flows and pressures throughout the community. In addition to water storage tanks at the Water Treatment Plant, there are nine water storage tanks located within the City’s distribution system, and a few have been in operation since the early 1940s. Maintenance of water storage facilities is necessary to prolong the useful life of these assets and ensures staff’s ability to operate the water system to State and Federal standards. In 2012, a consultant was hired to inspect and produce a report regarding the interior and exterior of the City’s water storage tanks. The report included recommendations, and preliminary cost estimates for future maintenance projects. Following the inspection of the tanks, staff worked with the consultant to assign a priority ranking for each future maintenance project. The proposed projects for funding include:
1) Wash Water Tank No. 1 is experiencing excessive corrosion on the inner roof area. To prevent the tank structure from deteriorating and to prolong the tank’s lifespan, new interior and exterior coatings are required and reconstruction of the roof’s structural members is needed.
2) Reservoir 2, the City’s largest treated potable water storage tank, needs a new floating cover and associated equipment. The existing floating cover has reached the end of its service life. Reservoir 2 is a concrete water storage tank. 3) Edna Tank, the City’s largest steel potable water storage tank, is experiencing corrosion on the interior surfaces and requires new interior and exterior coatings to prevent the corrosion from spreading into the structural members. Coating projects are preventative maintenance and will prolong the life span of the tank and reduce the likelihood of future costly component failures. This project will be grouped with other coating projects to capitalize on potential savings from a larger construction project.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 755,000 1,000,000 127,000 1,100,000 1,100,000 4,082,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 755,000 1,000,000 127,000 1,100,000 1,100,000 4,082,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 755,000 1,000,000 127,000 1,100,000 1,100,000 4,082,000 CIP# 18 Financial Plan Page 387

Page 815 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001030 General Parking Structure Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
In 2018, the City completed a Parking Structure Capital Asset Management Plan that identify necessary maintenance projects that will repair deficiencies, improve aesthetics and extend the useful life of each structure. This funding will address ongoing maintenance at the City's parking structures. Funding captures ongoing maintenance for all city owned parking structures.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 700,000 700,000 1,000,000 1,100,000 1,100,000 4,600,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
611 - Parking Fund 700,000 700,000 1,000,000 1,100,000 1,100,000 4,600,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parking Fund 700,000 700,000 1,000,000 1,100,000 1,100,000 4,600,000 CIP# 19 Financial Plan Page 388

Page 816 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001056
Water Treatment Plant - Building
Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
The Water Treatment Plant has been in operation since the 1940’s with some facilities upgraded in 1963, 1994, and 2008. Additional repairs, maintenance, and energy efficiency projects were completed between 2010 and 2022. The Building Maintenance Project will provide asset replacement funds to repair roof and window leaks experienced in the administration building and replace the carpet on the second floor of the building.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 650,000 0 0 0 0 650,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 650,000 0 0 0 0 650,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 650,000 0 0 0 0 650,000
CIP# 20 Financial Plan Page 389

Page 817 of 970 ends

Capital Improvement Plan
Project Number Project Name
91385 Park Major Maintenance & Repairs
Project Classification Classification Description
CIP Project Function Community & Neighborhood Livability Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type
Annual Asset Maintenance, Asset
Replacement
Purpose and Need
Parks require ongoing maintenance in order to continue to provide users a safe and quality experience. This Annual Asset Maintenance Account provides ongoing funding for the maintenance and replacement of a park infrastructure. This account provides funding annually for parks surfacing maintenance and water supply infrastructure including the installation of hydration stations. Larger maintenance projects include, but are not limited to:
• 2023-24: Jack House Arbor, Parks Play Surfacing, Water Station and Supply Lines, Mission Plaza Railing Upgrade, and Irrigation Leak Repairs and Improvements
• 2024-25: Parks Play Surfacing, Water Station and Supply Lines, ADA Transition Plan support, Concrete Bench and Table Replacements, Landscape Controller System Upgrades, and Sinsheimer Stadium Lighting Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 520,000 440,000 710,000 1,410,000 1,117,500 4,197,500 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 520,000 440,000 710,000 1,410,000 1,117,500 4,197,500 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 100,000 0 0 0 0 100,000
Local Revenue Measure 420,000 440,000 710,000 1,410,000 1,117,500 4,097,500 CIP# 21 Financial Plan Page 390

Page 818 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001059 ATP - South/King Crossing
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project Yes
Project Classification Transportation
Project Type New Asset
Purpose and Need
This project includes installation of a Pedestrian Hybrid Beacon crossing at the intersection of South Street & King Street, improving connectivity for pedestrians and cyclists between Meadow Park, Hawthorne Elementary School, and the existing King-Nipomo Neighborhood Greenway.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 500,000 0 0 0 0 500,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 500,000 0 0 0 0 500,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total SLOCOG Grant 500,000 0 0 0 0 500,000
CIP# 22 Financial Plan Page 391

Page 819 of 970 ends

Capital Improvement Plan
Project Number Project Name
91503 California & Taft Roundabout
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project Yes
Project Classification Transportation
Project Type Asset Replacement
Purpose and Need
This project includes Installation of a roundabout at the intersection of California & Taft, which improves traffic safety and congestion for all road users. This project also improves pedestrian and bicycle connectivity to the newly constructed segment of the Railroad Safety Trail on the west side of California Boulevard. Grant Funding will be pursued during design phases and project development to fund construction costs to the maximum extent possible, with a small contribution from Cal Poly supporting various phases of the project.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 500,000 0 3,022,000 0 0 3,522,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 500,000 0 3,022,000 0 0 3,522,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 500,000 0 3,022,000 0 0 3,522,000 CIP# 23 Financial Plan Page 392

Page 820 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000057 Development Related Park Improvements
Project Classification Classification Description
CIP Project Function Culture & Recreation
Major City Goal Housing and Homelessness
Partnership Project Yes
Project Classification Community Improvement
Project Type New Asset
Purpose and Need
With the dedication of parkland and park fees collected from developments within the Orcutt Area Specific Plan (OASP), the City will be developing the four parks as provided in the OASP development plans. Parks include a neighborhood park, linear park, pocket park and trail junction park with recreation amenities such as pickleball and tennis courts, playground, restrooms, sport fields, dog park, basketball court, BBQ pavilion, and bike/pump track. Initial conceptual designs were approved by the Parks and Recreation Commission in 2016, but additional public input is being gathered in 2023 for formal park design and scope with design in 2023 and project start in 2024. Additional projects to be supported will utilize Parkland-in-lieu fees paid by San Luis Ranch per the development agreement to construct park amenity enhancements at Laguna Lake Park. Enhancements will be guided by the new Parks and Recreation Blueprint for the Future.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 500,000 5,423,642 250,000 0 0 6,173,642 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 3,237,138 0 0 0 3,237,138
510 - Parkland Development
Impact Fee - Citywide 0 138,341 0 0 0 138,341
511 - OASP Park Fund 500,000 1,211,641 250,000 0 0 1,961,641 519 - Park Improvement
Impact Fee Fund - Citywide 0 836,522 0 0 0 836,522
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 0 3,237,138 0 0 0 3,237,138
Parkland Development
Impact Fees 500,000 2,186,504 250,000 0 0 2,936,504
CIP# 24 Financial Plan Page 393

Page 821 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000502 Active Transportation Plan Implementation
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
In February of 2021, the City adopted its first Active Transportation Plan (ATP), which identifies policies, programs and projects needed to support a high-quality, safe and efficient citywide bicycle and pedestrian transportation system. Elements of the Active Transportation Plan are implemented through private development as well as City-led programs and capital improvement projects.

This larger capital project encompasses planning, design and construction of several smaller sub-projects to support implementation of the Active Transportation Plan which includes:
• Pedestrian Facility Improvements
• Bicycle Facility Improvements
• Area Sealing Projects - Complete Streets
• ATP Tier 1 Network Implementation
• Bikeshare System Implementation
Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 435,000 550,000 520,000 2,400,000 2,400,000 6,305,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 435,000 550,000 520,000 2,400,000 2,400,000 6,305,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 0 0 100,000 2,000,000 2,000,000 4,100,000 Local Revenue Measure 390,000 460,000 375,000 355,000 355,000 1,935,000 Transportation Development
Act TDA 45,000 90,000 45,000 45,000 45,000 270,000
CIP# 25 Financial Plan Page 394

Page 822 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000027 Urban Forest Maintenance
Project Classification Classification Description
CIP Project Function Community & Neighborhood Livability Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City’s Urban Forest is comprised of approximately 13,000 public trees. Regular tree pruning and related maintenance provides for an attractive, healthy, and safer urban forest. This funding will be used to provide annual tree pruning in neighborhoods and the downtown to compliment the Urban Forest Master Plan used to guide long term maintenance and operations program efforts.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 420,000 440,000 450,000 450,000 450,000 2,210,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 420,000 440,000 450,000 450,000 450,000 2,210,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 420,000 440,000 450,000 450,000 450,000 2,210,000 CIP# 26 Financial Plan Page 395

Page 823 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000062 Water Meters and Boxes
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project funds the material cost for water meters, meter appurtenances, and meter boxes where water distribution staff needs to remove or repair public water meters within the distribution system that are reported to be defective. The objective of the project is to increase accuracy and reliability of public water meters, and efficiently manage all water resources in a cost-effective manner. When leaks are suspected, water distribution staff will use best available technology to monitor the water service area (pressure zone) using:
leak detection equipment, sound correlators, radio monitoring telemetry of water flows around a pressure zone, and pilot tests by the water distribution staff for a temporary district metering area.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 335,000 343,000 350,000 350,000 350,000 1,728,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 167,500 171,500 175,000 175,000 175,000 864,000 602 - Sewer Fund 167,500 171,500 175,000 175,000 175,000 864,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 167,500 171,500 175,000 175,000 175,000 864,000 Water Fund 167,500 171,500 175,000 175,000 175,000 864,000 CIP# 27 Financial Plan Page 396

Page 824 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000525 Parking Enforcement Equipment at Gate Entry
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type New Asset
Purpose and Need
The current parking garage payment and gating equipment installed several years ago already requires daily maintenance and troubleshooting by Parking Services staff. This garage equipment does not integrate with new enforcement technology, nor does it integrate with the recently installed on-street multi-space pay stations. This project will replace the existing payment and gating equipment with a gateless system that uses pay stations and mobile payment technology to provide a seamless, integrated experience for our customers. The new equipment will allow Parking Services staff to enforce paid parking in the garages more efficiently. The new equipment will also save staff time from troubleshooting hardware issues and reduce customers’ frustrations when parking downtown.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 300,000 0 0 0 0 300,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
611 - Parking Fund 300,000 0 0 0 0 300,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parking Fund 300,000 0 0 0 0 300,000
CIP# 28 Financial Plan Page 397

Page 825 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001062
ATP - Railroad Safety Trail (Orcutt to Tiburon)
and Bullock Culvert Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
This project includes closing the existing gap in the Railroad Safety Trail within the Orcutt Area, extending the shared-use path parallel to Bullock Lane between Tiburon Drive and Orcutt road. Project also includes reconstruction of the existing narrow culvert on Bullock Lane to provide width for two auto lanes, a shared-use path on the west side and continuous sidewalks on the east side.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 300,000 100,000 2,000,000 0 0 2,400,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
515 - OASP Transportation
Impact Fee Fund 300,000 100,000 2,000,000 0 0 2,400,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total OASP Impact Fee Fund 300,000 100,000 2,000,000 0 0 2,400,000 CIP# 29 Financial Plan Page 398

Page 826 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000031 Parking Lot Maintenance
Project Classification Classification Description
CIP Project Function Community & Neighborhood Livability Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The total area of City maintained parking lots is approximately 360,000 square feet or 8.3 acres. In order to increase the percentage of lot surfaces in good condition, regular maintenance needs to be completed. The following parking lots have been identified for maintenance and repair:
2023-24: Meadow Park, Fire Station 2, and ongoing minor repairs. 2024-25: Santa Rosa Park, Damon Garcia Sports Complex, Throop Park, Mitchell Park and SLO Senior Center, Johnson Park and ongoing minor repairs.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 285,000 745,000 515,000 1,330,000 615,000 3,490,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 285,000 745,000 515,000 1,330,000 615,000 3,490,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 0 530,000 0 0 0 530,000
Local Revenue Measure 285,000 215,000 515,000 1,330,000 615,000 2,960,000 CIP# 30 Financial Plan Page 399

Page 827 of 970 ends

Capital Improvement Plan
Project Number Project Name
91147 Water Utility Trench Repair
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The project includes repairs to paved areas by Job Order Contract (JOC) where water distribution staff needs to remove, or repair service connections within the public right of way. The objective of the project is to remove city owned polybutylene service connections, cast iron fittings, deteriorated water pipes, and to efficiently replace several temporary asphalt patches with permanent pavement using bulk orders from the JOC.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 280,000 280,000 280,000 280,000 280,000 1,400,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 280,000 280,000 280,000 280,000 280,000 1,400,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 280,000 280,000 280,000 280,000 280,000 1,400,000 CIP# 31 Financial Plan Page 400

Page 828 of 970 ends

Capital Improvement Plan
Project Number Project Name
91149 Water Valve Cover Adjustments
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The project includes raising or lowering water valve covers in conjunction with City road paving operations. The objective of the project is to protect existing water valves and access covers from damage by paving machinery, and to efficiently complete paving operations within the roadway.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 276,000 35,000 35,000 35,000 35,000 416,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 276,000 35,000 35,000 35,000 35,000 416,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 276,000 35,000 35,000 35,000 35,000 416,000
CIP# 32 Financial Plan Page 401

Page 829 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000561
Sewer-main Replacement: Morro, Mill, Santa
Rosa, and Chorro
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City’s wastewater collection system includes approximately 140 miles of sewer mains. Some pipes are over 100 years old and are undersized to handle the current flow rates. Maintenance needs increase dramatically as pipelines reach their flow capacities, or when they approach the end of their useful life. Pipelines in the public wastewater collection system are inspected using specialized video equipment that will prioritize periodic cleaning frequencies or recommend a complete replacement. Based on the assessment, this project is needed for the replacement of sewer mains dating back to 1948 that require high cleaning frequencies, have experienced structural failures due to root intrusions, and have shown high infiltration flows rates during major storm events.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 253,000 0 0 0 0 253,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 253,000 0 0 0 0 253,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 253,000 0 0 0 0 253,000
CIP# 33 Financial Plan Page 402

Page 830 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000065 Water Distribution System - Point Repairs
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Replacement of water distribution pipes, mainlines, and related infrastructure is an ongoing program to provide a reliable water distribution network including fire protection. The point repair project will address existing deficiencies, and the potential for near-term failure according to priority. The objective of the project is to explore opportunities to consolidate water distribution service areas (pressure zones) and construct new pipe interconnections between pressure zones to simplify operations, improve water reuse operations, reduce pumping needs, and eliminate pump stations or tanks that would otherwise require replacement. The project efforts may include engineering reports, updates to the computer hydraulic model, construction plans for point repairs, construction management services, tank re-coatings, pump maintenance, updates to construction water filling stations, materials for point repairs, grant applications, and field testing of water distribution infrastructure.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 250,000 0 250,000 0 250,000 750,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 250,000 0 250,000 0 250,000 750,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 250,000 0 250,000 0 250,000 750,000
CIP# 34 Financial Plan Page 403

Page 831 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000542 Water Treatment Plant – Asset Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type
Annual Asset Maintenance, Asset
Replacement
Purpose and Need
The City’s Water Treatment Plant was originally constructed in 1961. In 1995, a significant upgrade to the plant was completed to meet changing water quality requirements. In April of 2008, another major upgrade project was completed that replaced older equipment, added additional storage capacity for treated water, and enhanced treatment processes. The ongoing maintenance of the facilities and equipment at the Water Treatment Plant is necessary to prolong the useful life of the facilities and ensure staff’s ability to operate the plant and treat water to State and Federal standards. The proposed maintenance projects include maintenance to ozone system, chemical storage system, air compressor, package thickener, aluminum bulk tank replacement, lab analyzer replacement, polymer mixing unit rehabilitation, rehabilitation of pump station pressure sustaining valves, facility roof repairs, and the development of a Facility Infrastructure Renewal Strategy. The renewal strategy will allow plant staff to prioritize Water Treatment Plant related capital improvement projects for the next decade. An asset management plan will also be developed to track infrastructure performance and maintenance cycles.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 245,000 115,000 145,000 45,000 140,000 690,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 245,000 115,000 145,000 45,000 140,000 690,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 245,000 115,000 145,000 45,000 140,000 690,000 CIP# 35 Financial Plan Page 404

Page 832 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001048
Waterline Replacement: Santa Rosa -
Stenner Creek Road to Highland 30-inch
Pipeline
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
The water transmission pipeline extending from the Water Treatment Plant to Santa Rosa Road is not constructed of standard material types or sizes and if a leak occurs, it would be difficult to repair without putting many residents out of water service, triggering boil water notices across the eastern side of the City. Installed in 1964 using concrete cylinder pipe (CCP) materials, the pipeline does not meet current seismic standards and is need for replacement within the next 5 years. The existing 27-inch CCP will be replaced with a new 30-inch seismic restrained ductile iron pipe for the distribution of treated water into the Foothill and Downtown services areas. The new alignment will follow Environmental Protection Agency (EPA)-recommended design guidelines for “lifeline services” providing reliable water resources during catastrophic events.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 230,000 0 8,230,000 0 0 8,460,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 230,000 0 8,230,000 0 0 8,460,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 230,000 0 8,230,000 0 0 8,460,000
CIP# 36 Financial Plan Page 405

Page 833 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000503 Annual Public Art Maintenance and Projects
Project Classification Classification Description
CIP Project Function Culture & Recreation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This funding addresses maintenance needs of the public art program for the current collection of artwork. Addressing repairs is recommended annually during the next five years of the City’s CIP. In addition to maintenance projects, this funding will also allow for re-painting of Utility Box artwork and temporary public art pieces such as murals and wraps.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 225,000 200,000 100,000 100,000 100,000 725,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
207 - Public Art Private
Sector Fund 225,000 200,000 100,000 100,000 100,000 725,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 75,000 50,000 0 0 0 125,000
Local Revenue Measure 150,000 150,000 100,000 100,000 100,000 600,000 CIP# 37 Financial Plan Page 406

Page 834 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000521 Fleet Replacement: Utilities
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Fleet
Project Type Annual Asset Maintenance
Purpose and Need
This funding replaces existing City vehicles in compliance with revised Fleet Replacement Guidelines. Revised Fleet Replacement Guidelines include the evaluation of the following criteria: Emission Compliance, Engine hours, Mileage, Age, Known Manufacture Problems, Repair Cost History, Utilization, and Fleet System Analytics. Additionally, the age and mileage replacement targets have been extended for all vehicle and equipment categories within the Fleet. New vehicle and equipment replacements are selected with the cleanest emissions systems possible that can be fueled and/or charged locally while meeting the end users' operational needs.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 220,000 150,000 948,772 87,500 1,568,000 2,974,272 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 60,000 150,000 715,000 0 995,000 1,920,000 602 - Sewer Fund 85,000 0 20,000 40,000 570,000 715,000 705 - Whale Rock Fund 75,000 0 213,772 47,500 3,000 339,272 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 85,000 0 20,000 40,000 570,000 715,000
Water Fund 60,000 150,000 715,000 0 995,000 1,920,000
Whale Rock Fund 75,000 0 213,772 47,500 3,000 339,272
CIP# 38 Financial Plan Page 407

Page 835 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000514
Emerson Park Amenity Upgrades and
Beautification
Project Classification Classification Description
CIP Project Function Community & Neighborhood Livability Major City Goal Other
Partnership Project No
Project Classification Community Improvement
Project Type New Asset
Purpose and Need
This project received the California Prop. 68 grant award in December 2021 in the amount of $2.8 Million for amenity upgrades and park beautification at Emerson Park. Park upgrades include construction of restrooms, creation of a small fenced dog park, installation of an educational garden and amenity upgrades and expansion of the basketball court, playground, perimeter fencing, and addition of safety lighting. To satisfy the Prop 68 Grant, the project's scheduled completion date is March 2025 and requires additional funding beyond the $2.8 Million grant amount as outlined below.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 0 0 0 200,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
510 - Parkland Development
Impact Fee - Citywide 200,000 0 0 0 0 200,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parkland Development
Impact Fees 200,000 0 0 0 0 200,000
CIP# 39 Financial Plan Page 408

Page 836 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000516
Fire Station 3&4 Remodel Space Study and
Design
Project Classification Classification Description
CIP Project Function Community Safety
Major City Goal Diversity, Equity, and Inclusion (DEI)
Partnership Project No
Project Classification Public Facility
Project Type Asset Replacement
Purpose and Need
In an effort to make the Fire Department a more inclusive environment and to support the City Council's Major City Goal of Diversity, Equity and Inclusion, the Fire Department is seeking to remodel the living quarters for Fire Stations 3 and Station 4. Both Stations were designed with dorm-like sleeping quarters that lack the needed privacy for a multi-gendered staff. Station 4 will also need bathroom modifications in addition to the living quarters. This project will allow the fire department to conduct a space study and design, allowing staff to properly plan for the remodel scope and budget requirements.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 1,000,000 0 0 1,200,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 200,000 0 1,000,000 0 0 1,200,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 200,000 0 1,000,000 0 0 1,200,000 CIP# 40 Financial Plan Page 409

Page 837 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001058
ATP - Foothill Boulevard Complete Street
Project
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
This project includes complete street and active transportation safety improvements along Foothill Boulevard between the western city limits and the UPRR crossing near California Boulevard consistent with the Active Transportation Plan and Bishop Peak/Pacheco Elementary Safe Routes to School Plan. Improvements include buffered/protected bike lanes, pedestrian crossing improvements, and speed reduction elements.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 2,400,000 0 0 2,600,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 200,000 0 2,400,000 0 0 2,600,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 200,000 0 0 0 0 200,000
State or Federal Grant 0 0 2,400,000 0 0 2,400,000
CIP# 41 Financial Plan Page 410

Page 838 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001061
ATP - Orcutt Road Railroad Crossing
Upgrades
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
This project includes various improvements to improve multimodal crossing safety at the existing at-grade railroad crossing on Orcutt Road near the Orcutt Road/Laurel Lane/Bullock Lane intersection. Proposed improvements include sign/striping enhancements, installation of standard width shared-use paths across both sides of the railroad tracks, installation of pedestrian/bicycle warning devices/flashers, and extension of narrow center median on Orcutt between Sacramento Street and existing median at railroad crossing. Improvements are required by Union Pacific Railroad to allow completion of Railroad Safety Trail gap closure in Orcutt Area.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 500,000 0 0 700,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 200,000 0 500,000 0 0 700,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 200,000 0 500,000 0 0 700,000
CIP# 42 Financial Plan Page 411

Page 839 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001050 Sewer Lift Station Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Replacements of pumps, valves, fittings, electrical components, telemetry, and related infrastructure are an ongoing need for reliable wastewater lift stations. The purpose of this project is to categorize the costs for major asset replacements needed at lift stations in effort to extend the life of the infrastructure without having to replace the entire facility. The project may include engineering reports, updates to the computer hydraulic model, construction plans for lift station rehabilitation projects, construction management services, coatings, pump maintenance, bypass pumping services, telemetry upgrades, electrical repairs, field testing of infrastructure, and early purchase of materials that are now experiencing long lead times due to delays in supply chains.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 80,000 0 80,000 360,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 200,000 0 80,000 0 80,000 360,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 200,000 0 80,000 0 80,000 360,000
CIP# 43 Financial Plan Page 412

Page 840 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000056 Development Agreement - City Share
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project Yes
Project Classification Transportation
Project Type New Asset
Purpose and Need
This funding supports the City's proportional share of oversized infrastructure constructed by various development projects.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 850,000 560,000 2,300,000 3,910,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 0 850,000 560,000 2,300,000 3,710,000 405 - Infrastructure Invest
CIP Fund 200,000 0 0 0 0 200,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 200,000 0 0 0 0 200,000
Local Revenue Measure 0 0 850,000 560,000 2,300,000 3,710,000 CIP# 44 Financial Plan Page 413

Page 841 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001032
Pismo Street Retaining Wall - Storm
Response
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type New Asset
Purpose and Need
Since 2008, the hillslope along Pismo Street between Morro and Chorro has be deteriorating, resulting in installation of protective k-rail barriers chain link fencing to prevent rockfall from injuring the public. In December 2021, additional failures and dislodging of boulders occurred, necessitating a geotechnical consultant to evaluate the slope. These damages were further exacerbated in the Winter 2023 storm events. The consultant has recommended a long-term fix of a vertical retaining wall to mitigate the issue.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 200,000 0 1,700,000 0 0 1,900,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 200,000 0 1,700,000 0 0 1,900,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 200,000 0 1,700,000 0 0 1,900,000 CIP# 45 Financial Plan Page 414

Page 842 of 970 ends

Capital Improvement Plan
Project Number Project Name
99653
Water Treatment Plant - Major Equipment
Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City’s Water Treatment Plant was originally constructed in 1961. In 1995, a significant upgrade to the plant was completed to meet changing water quality requirements. In March of 2023, another major upgrade project was completed that replaced older disinfection equipment, added additional source water capacities needed to enhance the treatment processes. The ongoing maintenance of the facilities and equipment at the Water Treatment Plant is necessary to prolong the useful life of the facilities and ensure staff’s ability to operate the plant and treat water to State and Federal standards. The purpose and need for this project are to contract major equipment maintenance required for the ozone disinfection system and associated chiller systems. The product vendors conduct the service maintenance to ensure optimal performance and collaborate with plant operators during normal operations of the disinfection system.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 189,000 180,000 180,000 180,000 180,000 909,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 189,000 180,000 180,000 180,000 180,000 909,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 189,000 180,000 180,000 180,000 180,000 909,000 CIP# 46 Financial Plan Page 415

Page 843 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000084 Sewer Maintenance Cover Adjustments
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project funds the raising or lowering sewer maintenance covers when the City paves roadways. The objective of the project is to protect existing sewer maintenance cover frames and pipes from damage by paving machinery, and to efficiently complete paving operations within the roadway.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 180,000 30,000 30,000 30,000 30,000 300,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 180,000 30,000 30,000 30,000 30,000 300,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 180,000 30,000 30,000 30,000 30,000 300,000
CIP# 47 Financial Plan Page 416

Page 844 of 970 ends

Capital Improvement Plan
Project Number Project Name
91294 Higuera St. Widening - Bridge to Elks
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type Asset Replacement
Purpose and Need
This funding supports the construction phase of a roadway safety improvement project to widen the segment of South Higuera Street between Bridge Street and Elks Lane to provide width for a center two-way left-turn lane. This project is partially funded through a Caltrans Highway Safety Improvement Program (HSIP) Grant and was recommended in the City's Traffic Safety Program to address a collision trend related to vehicle turns entering/exiting adjacent driveways along a street with no existing turn lanes. Street widening will also provide opportunity to improve on-street bikeways as recommended in the City's Active Transportation Plan and planned with the Higuera Corridor Complete Street project.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 180,000 0 0 0 0 180,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 180,000 0 0 0 0 180,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total USHA Grant 180,000 0 0 0 0 180,000
CIP# 48 Financial Plan Page 417

Page 845 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000513
Electric Vehicle Charging Station at Various
Facilities
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Public Facility
Project Type New Asset
Purpose and Need
This project provides electric vehicle charging stations to support the City's transition to electric fleet vehicles.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 175,000 100,000 150,000 150,000 150,000 725,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 75,000 100,000 150,000 150,000 150,000 625,000 601 - Water Fund 50,000 0 0 0 0 50,000
602 - Sewer Fund 50,000 0 0 0 0 50,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 75,000 100,000 150,000 150,000 150,000 625,000 Sewer Fund 50,000 0 0 0 0 50,000
Water Fund 50,000 0 0 0 0 50,000
CIP# 49 Financial Plan Page 418

Page 846 of 970 ends

Capital Improvement Plan
Project Number Project Name
99837 Open Space Acquisition
Project Classification Classification Description
CIP Project Function Environmental Health & Open Space
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Community Improvement
Project Type New Asset
Purpose and Need
The City continues to actively pursue land purchases and conservation easements to enhance the greenbelt around the City, which protects watersheds and maintains habitat connectivity. This funding is matched by grant funding to implement open space acquisition.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 175,000 150,000 250,000 150,000 150,000 875,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 175,000 150,000 250,000 150,000 150,000 875,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 175,000 150,000 250,000 150,000 150,000 875,000 CIP# 50 Financial Plan Page 419

Page 847 of 970 ends

Capital Improvement Plan
Project Number Project Name
91397 Open Space Maintenance
Project Classification Classification Description
CIP Project Function Environmental Health & Open Space
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project supports continued implementation of the City’s adopted Open Space Maintenance Plan. The ongoing maintenance of all City Open Space is premised on the protection of natural resources, including plants, animals, geologic and historic features and the natural areas themselves. Maintenance includes: enhancement to existing trailheads, maintenance and construction of approved and sustainable trails and open space facilities for passive recreation purposes only, removal of illicit materials and non-authorized trails, improved user and natural resource safety, land restoration and stewardship projects, invasive species treatment and control, erosion control and stabilization, education of users via patrols and community outreach, and management of the wildland-urban interface.

Additionally, funding helps establish new open space trails associated with recent acquisitions and planning for public use.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 170,000 170,000 170,000 170,000 320,000 1,000,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 170,000 170,000 170,000 170,000 320,000 1,000,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 170,000 170,000 170,000 170,000 320,000 1,000,000 CIP# 51 Financial Plan Page 420

Page 848 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000029 Bridge Preventative Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City of San Luis Obispo has 38 vehicular bridges and 11 pedestrian bridge ranging in age from one to 100+ years old. In accordance with Title 23 of the Code of Federal Regulations (Federal Highway Act) and the National Bridge Inspection Standards, CalTrans provides bridge inspections on vehicular bridges over 20’ in length every 2 to 4 years. The City is committed to providing lowcost preventative maintenance measures to extend the service life of these structures. The following bridges have been identified for maintenance:
• 2023 – Murray St. Near Santa Rosa (49C-397) – Crack Sealing / Concrete Repairs • 2023 – Chorro St. near Monterey/Higuera (49C-405) – Crack Sealing / Concrete Repairs • 2024 – Broad St. Culvert near Capitolio Way Crack Sealing / Concrete Repairs • 2024 – Elks Lane over San Luis Obispo Creek (49C-081) – Methacrylate Bridge Deck • 2024 & 2025 - Various Maintenance Repairs - Crack Sealing / Concrete Repairs - Bridge Locations by Caltrans Bridge Inspection Assessment Reports
Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 150,000 200,000 200,000 200,000 200,000 950,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 150,000 200,000 200,000 200,000 200,000 950,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 150,000 200,000 200,000 200,000 200,000 950,000 CIP# 52 Financial Plan Page 421

Page 849 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001047 Salinas Reservoir Transfer of Ownership Plan
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project Yes
Project Classification Public Facility
Project Type Asset Replacement
Purpose and Need
Salinas Reservoir (also known as Santa Margarita Lake) is located on the upper Salinas River, approximately 10 miles northeast of the City of San Luis Obispo (City) and captures water from a 112 square-mile watershed. The City has an agreement with U.S. Army Corps of Engineers (USACE) to receive water from the reservoir. The purpose of this study is to review the terms of the existing agreement and determine what alternatives may be available should USACE decide to transfer the ownership of the asset to a local agency.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 150,000 0 0 0 0 150,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 150,000 0 0 0 0 150,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 150,000 0 0 0 0 150,000
CIP# 53 Financial Plan Page 422

Page 850 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000198 Silt Removal
Project Classification Classification Description
CIP Project Function Community Safety
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Silt carried by storm water settles at points in the creek where the storm water's velocity decreases. This reduction in velocity allows solids suspended in the water to settle out. As these deposits build up, the capacity of the creek decreases and risk of flooding of the surrounding areas increases. The regular removal of silt restores channel capacity and reduces risk of flooding.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 150,000 150,000 150,000 150,000 150,000 750,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 150,000 150,000 150,000 150,000 150,000 750,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Zone 9 150,000 150,000 150,000 150,000 150,000 750,000
CIP# 54 Financial Plan Page 423

Page 851 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000551 WRRF Power Cogeneration Upgrade
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
The City’s Water Resource Recovery Facility (WRRF) upgrade will comply with stricter discharge limits required by the Central Coast Water Board (CCWB), increase wastewater treatment capacity to serve the community, and to replace aging infrastructure that has reached the end of their service life. The 2015 WRRF Facilities Plan identified the need for the WRRF upgrade and other infrastructure needs based on priority. One of those priority projects, is the expansion of the biogas production and emissions control upgrades per regulatory requirements. This project will study the increase of bio-gas production using field measurements of the new digester system and develop a plan to upgrade the emission treatment system per regulatory requirements. This project will be coordinate with the California Resiliency Challenge and the Department of Energy’s models to consider alternatives for sustainable power solutions.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 150,000 0 1,475,000 0 0 1,625,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 150,000 0 1,475,000 0 0 1,625,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 150,000 0 1,475,000 0 0 1,625,000
CIP# 55 Financial Plan Page 424

Page 852 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001055 WRRF - Building Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The WRRF has been in operation since the 1930’s with various levels of upgrades in 1964, 1992, and most recently in 2022. The facilities housing the staff includes the laboratory, operations building, maintenance shed, and the administration building, which have not been upgraded since their original construction. This building maintenance category will provide asset replacement funds to renovate ancillary facilities and extend the life of the facility. The current needs include replacement of the laboratory chemical vent, air circulation fans, HVAC system, and security upgrades to the existing doors.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 150,000 0 825,000 0 0 975,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 150,000 0 825,000 0 0 975,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 150,000 0 825,000 0 0 975,000
CIP# 56 Financial Plan Page 425

Page 853 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000073 Vision Zero Program Implementation
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project supports implementation of the City's Traffic Safety/Vision Zero program, funding the highest-priority safety and operational improvements to support the City's adopted goal to eliminate traffic-related fatalities and severe injuries citywide.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 140,000 120,000 120,000 120,000 120,000 620,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 140,000 120,000 120,000 120,000 120,000 620,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 140,000 120,000 120,000 120,000 120,000 620,000 CIP# 57 Financial Plan Page 426

Page 854 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000032 Pedestrian and Bicycle Pathway Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
There are approximately 6.5 miles of asphalt concrete pathways and bike paths within the City. Examples of these paths are the Railroad Safety Trail, the Bob Jones Trail, and various pathways located within City parks. These pathways are used by bicycles and pedestrians, along with occasional service vehicles. To maintain accessibility to these facilities and reduce the risk of accidents, regular maintenance of pathways is important.
2023-24: Various Locations
2024-25: Various Locations, Railroad Safety Trail
2025-26: Various Locations, Railroad Safety Trail, Andrews and Johnson Bike Path 2026-27: Various Locations, Brookpine and Spanish Oaks Trail 2027-28: Various Locations, Pavement Area 2 & 3 Bike Path Sealing Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 125,000 435,000 365,000 400,000 300,000 1,625,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 125,000 435,000 365,000 400,000 300,000 1,625,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 0 275,000 150,000 0 0 425,000
Local Revenue Measure 125,000 160,000 215,000 400,000 300,000 1,200,000 CIP# 58 Financial Plan Page 427

Page 855 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000527
Wastewater Collections System - Point
Repairs
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Point repairs of sewer mains and related infrastructure is necessary for a reliable wastewater collection system. This point repair project will address existing deficiencies in a surgical manner and identify potential failures in the public wastewater collection system using video inspections of public mains. The objective of the point repair project is to explore opportunities to improve wastewater catchment areas in a surgical method with limited impacts to traffic circulation and paved roads. The project efforts may include engineering reports, video inspections, updates to the computer hydraulic model, construction plans for point repairs, construction management services, re-coatings of maintenance structures (MHs), research for grants programs, and field testing of the wastewater collection system. The following projects have been identified in this financial plan: elimination of sewer pipes along backyard easements, off-set joints along the pipe between maintenance structures, and computer modeling efforts of the proposed hydraulic modifications.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 120,000 0 120,000 0 120,000 360,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 120,000 0 120,000 0 120,000 360,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 120,000 0 120,000 0 120,000 360,000
CIP# 59 Financial Plan Page 428

Page 856 of 970 ends

Capital Improvement Plan
Project Number Project Name
90849 Sidewalk Replacement and Installation
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City has an established system of streets with curbs, gutters, and sidewalks. The City’s sidewalk system is comprised of 202 miles of sidewalk and 2436 points at intersections where pedestrians cross the street. New replacement installations of sidewalk and curb ramps are required to continue the City’s program to provide a complete and accessible pedestrian path of travel.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 100,000 150,000 250,000 250,000 250,000 1,000,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 100,000 150,000 250,000 250,000 250,000 1,000,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 100,000 150,000 250,000 250,000 250,000 1,000,000 CIP# 60 Financial Plan Page 429

Page 857 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001040
Waterline Replacement: Chorro - Highland to
Meinecke 24-inch Pipeline Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
The water transmission pipeline along Chorro Street from Highland to Meinecke is scheduled for replacement by the Water Master Plan. Installed in 1953 using concrete cylinder pipe (CCP) and cast-iron materials, the pipeline does not meet current seismic standards and is need for replacement within the next 5 years. The existing 18-inch CCP will be replaced with a new 24-inch seismic restrained ductile iron pipe for the distribution of treated water into the Foothill and Downtown services areas. The new alignment will follow Environmental Protection Agency (EPA)-recommended design guidelines for “lifeline services” providing reliable water resources during catastrophic events. This project will allow bypass pumping opportunities for future pipeline replacement projects and future interconnections between the two major pressure zones; High Pressure and the Downtown/Foothill Zone.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 100,000 1,900,000 0 0 0 2,000,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 100,000 1,900,000 0 0 0 2,000,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 100,000 1,900,000 0 0 0 2,000,000
CIP# 61 Financial Plan Page 430

Page 858 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000050 871 Marsh Street Structure Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
In 2018, the City completed a Parking Structure Capital Asset Management Plan that identify necessary maintenance projects that will repair deficiencies, improve aesthetics and extend the useful life of each structure. 871 Marsh is the City’s second oldest parking structure in the City and needs significant maintenance. This funding will address various maintenance improvements at the structure.

Future parking structure maintenance funding will be combined into one project (2001030).

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 100,000 0 0 0 0 100,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
611 - Parking Fund 100,000 0 0 0 0 100,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parking Fund 100,000 0 0 0 0 100,000
CIP# 62 Financial Plan Page 431

Page 859 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000532 Roundabout Public Art Installations
Project Classification Classification Description
CIP Project Function Culture & Recreation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project is to initiate planning for installation of public art in the center of current or planned City roundabouts.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 100,000 100,000 100,000 200,000 200,000 700,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
207 - Public Art Private
Sector Fund 100,000 100,000 100,000 200,000 200,000 700,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 100,000 100,000 100,000 200,000 200,000 700,000 CIP# 63 Financial Plan Page 432

Page 860 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000049 842 Palm Parking Structure Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
In 2018, the City completed a Parking Structure Capital Asset Management Plan that identify necessary maintenance projects that will repair deficiencies, improve aesthetics and extend the useful life of each structure. 842 Palm is the City’s oldest parking structure and needs significant maintenance. This funding will address various maintenance improvements at the structure. Future parking structure maintenance funding will be combined into one project (2001030).

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 100,000 0 0 0 0 100,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
611 - Parking Fund 100,000 0 0 0 0 100,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parking Fund 100,000 0 0 0 0 100,000
CIP# 64 Financial Plan Page 433

Page 861 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001029 License Plate Recognition Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Parking Enforcement currently operates 2 Genetec License Plate Recognition camera systems (LPR). The LPR units were purchased in 2017. Hardware for both units will no longer be supported as of the end of the 2023 calendar year.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 97,000 0 0 0 0 97,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
611 - Parking Fund 97,000 0 0 0 0 97,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Parking Fund 97,000 0 0 0 0 97,000
CIP# 65 Financial Plan Page 434

Page 862 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000506 Bus Shelter Replacements
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type Asset Replacement
Purpose and Need
This is an ongoing program to replace bus shelters at various locations as they reach the end of their useful life.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 90,000 90,000 90,000 90,000 90,000 450,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
621 - Transit Fund 90,000 90,000 90,000 90,000 90,000 450,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total State or Federal Grant 90,000 90,000 90,000 90,000 90,000 450,000 CIP# 66 Financial Plan Page 435

Page 863 of 970 ends

Capital Improvement Plan
Project Number Project Name
91616 Street Lights - Annual Asset Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This annual asset account supports the establishment of new streetlights requested by the community and maintenance/replacement of existing streetlights as needed.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 75,000 75,000 75,000 80,000 80,000 385,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 75,000 75,000 75,000 80,000 80,000 385,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 75,000 75,000 75,000 80,000 80,000 385,000 CIP# 67 Financial Plan Page 436

Page 864 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000519 Fleet Replacement: Parks and Recreation
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Fleet
Project Type Annual Asset Maintenance
Purpose and Need
This funding replaces existing City vehicles in compliance with revised Fleet Replacement Guidelines. Revised Fleet Replacement Guidelines include the evaluation of the following criteria: Emission Compliance, Engine hours, Mileage, Age, Known Manufacture Problems, Repair Cost History, Utilization, and Fleet System Analytics. Additionally, the age and mileage replacement targets have been extended for all vehicle and equipment categories within the Fleet. New vehicle and equipment replacements are selected with the cleanest emissions systems possible that can be fueled and/or charged locally while meeting the end users' operational needs.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 75,000 0 70,000 80,000 85,000 310,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
402 - Fleet Repl Fund 75,000 0 70,000 80,000 85,000 310,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Capital Outlay 0 0 70,000 0 0 70,000
Local Revenue Measure 75,000 0 0 80,000 85,000 240,000
CIP# 68 Financial Plan Page 437

Page 865 of 970 ends

Capital Improvement Plan
Project Number Project Name
90943 Traffic Signs & Striping Maintenance
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City is responsible for maintaining approximately 15,000 traffic signs and 134 miles of roadway striping. The Federal Highway Administration has adopted a mandate requiring public agencies to maintain minimum reflectivity standards for signs and pavement markings to help ensure nighttime visibility. Specifically, this funding will be used to replace signs, lanes lines, stop bars, marked crosswalks and other roadway indicators enhancing safety for motorists, cyclist and pedestrians.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 75,000 75,000 75,000 75,000 75,000 375,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 75,000 75,000 75,000 75,000 75,000 375,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 75,000 75,000 75,000 75,000 75,000 375,000 CIP# 69 Financial Plan Page 438

Page 866 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000082 Sewer Lift Station Replacement - Silver City
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
The Silver City Lift Station is a Smith and Loveless dry/wet well design and was put into service in 1971. The existing six-inch asbestos concrete force main pumps under San Luis Obispo Creek (it is encased under the creek) approximately 765 feet to a manhole upstream of the Laguna Lift Station. The Silver City lift station operates with two 450 gpm, 18.5 horsepower pumps. The station replacement will be located in the same current location proximity. An additional property acquisition and easements will be required to relocate both the new lift station and force main. In addition to the force main replacement, it will require the pipe to be encased in the San Luis creek crossing. The replacement lift station will accommodate a portion of the future development anticipated in the Margarita Area Specific Plan.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 70,000 100,000 1,980,000 0 0 2,150,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 70,000 100,000 1,980,000 0 0 2,150,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 70,000 100,000 1,980,000 0 0 2,150,000
CIP# 70 Financial Plan Page 439

Page 867 of 970 ends

Capital Improvement Plan
Project Number Project Name
91335 Whale Rock Reservoir - Asset Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Whale Rock Reservoir was originally constructed in 1961. In 2018, an assessment was completed to evaluate the condition of the Dam’s spillway and related infrastructure per requirements set by the Division of Safety of Dams (DSOD). The recommendations by the assessment include capital improvement projects required to operate the facility in a safe and reliable manner per DSOD requirements. Additionally, the ongoing maintenance of the facility and associated infrastructure at the Whale Rock Reservoir are necessary to prolong the useful life of the facilities and ensure staff’s ability to operate the dam and deliver water to the City.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 67,542 128,923 45,398 20,000 220,000 481,863 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
705 - Whale Rock Fund 67,542 128,923 45,398 20,000 220,000 481,863 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Whale Rock Fund 67,542 128,923 45,398 20,000 220,000 481,863 CIP# 71 Financial Plan Page 440

Page 868 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000063 Fire Hydrants
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project funds the materials cost for City owned fire hydrant assemblies when they need to be replaced if defective, leaking, or corroded. This project protects public health and the City’s water resources from waste.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 55,000 55,000 55,000 55,000 55,000 275,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 55,000 55,000 55,000 55,000 55,000 275,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 55,000 55,000 55,000 55,000 55,000 275,000 CIP# 72 Financial Plan Page 441

Page 869 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000537 Transportation Monitoring & Modeling Update
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
As required under the General Plan Circulation Element (Policy 7.7), the City conducts auto/bicycle/pedestrian traffic volume counts citywide every other year to monitor mode shift changes and traffic patterns resulting from land use projects, circulation improvements, and changes in travel behavior. Up-to-date traffic counts help support a variety of ongoing projects and programs, including tracking progress towards adopted mode shift targets, supporting traffic studies prepared for development entitlement review and local circulation studies, programing traffic signal timing, guiding future roadway improvements, and facilitating the City’s Traffic Safety/Vision Zero, Operations, and Neighborhood Traffic Management Programs. This funding also supports ongoing minor updates to the City's Travel Demand Forecasting Model, which are necessary for preparing future traffic volume forecasts and vehicle miles traveled (VMT) projections for development review and internal planning and monitoring.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 55,000 55,000 55,000 55,000 55,000 275,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
507 - Transportation Impact
Fee Fund 55,000 55,000 55,000 55,000 55,000 275,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Transportation Development
Impact Fee 55,000 55,000 55,000 55,000 55,000 275,000
CIP# 73 Financial Plan Page 442

Page 870 of 970 ends

Capital Improvement Plan
Project Number Project Name
91617
Whale Rock Transmission Pipeline
Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The 17.6 miles of pipeline conduit that transport water from the Whale Rock Reservoir (WRR) to the City of San Luis Obispo, Cal Poly, and California Men’s Colony is 57 years old. Given the aging infrastructure, an assessment of the pipeline’s condition has been completed to properly schedule repairs or replacement projects. Understanding the condition of the WRR pipeline has assisted in planning for long term pipeline reliability and associated maintenance needs, minimizing pipeline failures and associated disruptions, cost, and water leaks. The following scheduled repairs will include point repairs or replacement of pipe segments that have experienced corrosion or have failed the structural integrity assessment.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 51,000 0 60,000 510,000 550,300 1,171,300 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
705 - Whale Rock Fund 51,000 0 60,000 510,000 550,300 1,171,300 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Whale Rock Fund 51,000 0 60,000 510,000 550,300 1,171,300 CIP# 74 Financial Plan Page 443

Page 871 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001053 Waterline Abandonment & Connections
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Replacement of water distribution pipes, mainlines, and related infrastructure is an ongoing program for reliable water distribution and fire protection. This waterline abandonment and connections project will address existing deficiencies of public water mains in a surgical manner by eliminating publicly maintained lines that need to get consolidated into a new pressure zone or eliminating distribution mains running though backyard easements.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 50,000 50,000 50,000 50,000 50,000 250,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 50,000 50,000 50,000 50,000 50,000 250,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 50,000 50,000 50,000 50,000 50,000 250,000
CIP# 75 Financial Plan Page 444

Page 872 of 970 ends

Capital Improvement Plan
Project Number Project Name
91612 Neighborhood Traffic Improvements
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This funding continues the efforts to improve traffic conditions in existing neighborhoods, including collector and arterial streets with fronting residential. Each year the City receives requests for solutions to speeding and cut-through traffic problems. This funding allows for implementation of small to moderately sized projects to correct traffic related problems. Occasionally, larger needs are scoped and developed into stand-alone projects and budgeted individually.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 45,000 30,000 30,000 30,000 30,000 165,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 45,000 30,000 30,000 30,000 30,000 165,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 45,000 30,000 30,000 30,000 30,000 165,000 CIP# 76 Financial Plan Page 445

Page 873 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000157 Banner Arms, Bench Arm Rests, Signs
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Economic Resiliency, Cultural Vitality, and
Fiscal Sustainability
Partnership Project No
Project Classification Community Improvement
Project Type New Asset
Purpose and Need
Project provides banner arms, banners, arm rests and signs in the downtown.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 25,000 25,000 25,000 25,000 25,000 125,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 25,000 25,000 25,000 25,000 25,000 125,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 25,000 25,000 25,000 25,000 25,000 125,000 CIP# 77 Financial Plan Page 446

Page 874 of 970 ends

Capital Improvement Plan
Project Number Project Name
91740 Sewer Utility Trench Repair
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project includes repairs to paved areas by Job Order Contract (JOC) where wastewater collection staff addressed system failures, or potholing operations along the public sewer system. The objective of the project is to efficiently replace several temporary asphalt patches within the roadway that resulted from potholing operations with permanent pavement using bulk orders from the JOC.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 25,000 25,000 25,000 25,000 25,000 125,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 25,000 25,000 25,000 25,000 25,000 125,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 25,000 25,000 25,000 25,000 25,000 125,000
CIP# 78 Financial Plan Page 447

Page 875 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000093
Sewer-main Replacement: Serrano, Bressi,
Dana and Higuera Pipeline Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City’s wastewater collection system includes approximately 140 miles of sewer lines and related operational equipment. Some pipes are over 100 years old and are undersized. Maintenance needs and costs dramatically increase as pipeline and equipment approach the end of their useful life. The objective of this project is to replace sewer pipes in areas that have shown high inflow or infiltration flows based on recorded sewer spills, and high recorded flow rates during major storm events.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 25,000 1,275,000 0 0 0 1,300,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 25,000 1,275,000 0 0 0 1,300,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 25,000 1,275,000 0 0 0 1,300,000
CIP# 79 Financial Plan Page 448

Page 876 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000030 Laguna Lake Golf Course Maintenance
Project Classification Classification Description
CIP Project Function Culture & Recreation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This Annual Asset Maintenance Project for the Laguna Lake Golf Course provides funding for work activities such as replacement of the 40-year-old irrigation system, increasing water efficiencies by reducing leaks, and increase playability and safety of the turf.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 20,000 20,000 20,000 20,000 20,000 100,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 20,000 20,000 20,000 20,000 20,000 100,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 20,000 20,000 20,000 20,000 20,000 100,000 CIP# 80 Financial Plan Page 449

Page 877 of 970 ends

Capital Improvement Plan
Project Number Project Name
91734
Water Treatment Plant - Water Meter
Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project will install new water meters that track water resources coming in and out of the Water Treatment Plant in order to improve the accounting of volumes and flows impacting the water distributions system during water loss audits.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 10,000 30,000 54,800 0 0 94,800
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 10,000 30,000 54,800 0 0 94,800
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 10,000 30,000 54,800 0 0 94,800
CIP# 81 Financial Plan Page 450

Page 878 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000052
Buchon-Santa Rosa Intersection
Improvements
Project Classification Classification Description
CIP Project Function Community Safety
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The Intersection of Santa Rosa and Buchon has been flooding during rain events. This project will reduce flooding issues and improve pedestrian safety by updating the curb ramps and provide a high visibility crosswalk.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 0 100,000 0 0 100,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 0 0 100,000 0 0 100,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 0 0 100,000 0 0 100,000
CIP# 82 Financial Plan Page 451

Page 879 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000150
Sustainable Groundwater Management Act
GSP
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
The City of San Luis Obispo formed a Groundwater Sustainability Agency (GSA) in June of 2017 for management of the San Luis Valley Groundwater Basin (SLO Basin) in accordance with the Sustainable Groundwater Management Act (SGMA). This project will provide financial resources to collaborate with GSA stakeholders to effectively manage the groundwater basin in the city, which may include preparation of research studies, field investigations, legal documents, grant applications, and regional participation in the development and implementation of a groundwater sustainability plan.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 150,000 150,000 150,000 150,000 600,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 0 150,000 150,000 150,000 150,000 600,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 0 150,000 150,000 150,000 150,000 600,000
CIP# 83 Financial Plan Page 452

Page 880 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000102 Parking Lot Maintenance - Bus Yard
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
This project will rehabilitate the pavement at the Bus Yard facility front parking lot and provide improved functional area for future electric vehicles and expansion of the bus fleet.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 25,000 500,000 0 0 525,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
621 - Transit Fund 0 25,000 500,000 0 0 525,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total State or Federal Grant 0 25,000 500,000 0 0 525,000
CIP# 84 Financial Plan Page 453

Page 881 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000552 WRRF - Demolish Old Effluent Structure
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Asset Replacement
Purpose and Need
This project will demolish the old effluent structure at the Water Resource Recovery Facility.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 0 0 50,000 495,000 545,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 0 0 0 50,000 495,000 545,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 0 0 0 50,000 495,000 545,000
CIP# 85 Financial Plan Page 454

Page 882 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001036 Dalidio Drive Access Improvements
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type Annual Asset Maintenance
Purpose and Need
Includes design and construction of a new mid-block driveway on Dalidio Drive between the Post Office driveway and Froom Ranch Way to improve access to SLO Promenade retail center and Post Office. Project would provide left turn into SLO Promenade retail center from southbound Dalidio Drive and opportunity for U-turns for drivers exiting the Post Office and desiring to return northbound towards Madonna Road.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 0 0 25,000 75,000 100,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 0 0 25,000 75,000 100,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 0 0 0 25,000 75,000 100,000
CIP# 86 Financial Plan Page 455

Page 883 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000077 WRRF Asset Replacement
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance, New Asset
Purpose and Need
The City’s Water Resource Recovery Facility (WRRF) was originally constructed in 1941. In 1993, a significant upgrade to portions of the plant were completed to meet changing water quality requirements. In September of 2019, another major upgrade project known as Water Plus was initiated that will replace older equipment, provide additional treatment capacity, enhance disinfection with ultraviolet light to produce recycled water and reduce the use of disinfection chemicals. During construction, ongoing maintenance of existing facilities and equipment at the WRRF are necessary to prolong the useful life of the facilities and ensure staff’s ability to operate the plant and treat water to State and Federal standards until the upgrade is completed. The proposed asset replacement projects include servicing: screening washer-auger, influent storm pumps, screw press, primary scum pit, grit pumps, grit blowers, laboratory fans, security lights, chain link fence, and digester cleaning. Construction of these asset replacements will be coordinated with facility’s infrastructure renewal strategy and will allow plant staff to prioritize capital improvement projects for the next decade.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 125,000 125,000 75,000 200,000 525,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
602 - Sewer Fund 0 125,000 125,000 75,000 200,000 525,000 Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Sewer Fund 0 125,000 125,000 75,000 200,000 525,000
CIP# 87 Financial Plan Page 456

Page 884 of 970 ends

Capital Improvement Plan
Project Number Project Name
1000546
Waterline Replacement: Highland at UPRR
and Cal Poly
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Other
Partnership Project No
Project Classification Maintenance
Project Type Annual Asset Maintenance
Purpose and Need
Replacement of water distribution pipes, mainlines, and related infrastructure is an ongoing program for reliable water distribution and fire protection. The City operates a complex potable water distribution system that is comprised of 15 distribution zones, nine potable water storage tanks, two reservoirs, five hydro‐pneumatic tanks, seven pump stations, 21 pressure reducing valves (PRVs) and over 180 miles of pipe with diameters ranging in size from four inches to 30 inches. This project will replace critical infrastructure that has reached the end of its useful life, experienced water main breaks, and is ranked as a high priority for replacement by the water distribution’s infrastructure renewal strategy. The objective of the project is to replace cast-iron pipe or failing materials with pipe meeting new standards by the American Water Works Association (AWWA) to provide resiliency in the distribution network against variations in pressure and flows.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 0 0 850,000 0 850,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
601 - Water Fund 0 0 0 850,000 0 850,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Fund 0 0 0 850,000 0 850,000
CIP# 88 Financial Plan Page 457

Page 885 of 970 ends

Capital Improvement Plan
Project Number Project Name
2001035 Emily Street Extension
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal
Climate Action, Open Space, & Sustainable
Transportation
Partnership Project No
Project Classification Transportation
Project Type New Asset
Purpose and Need
Extend roadway and curb, gutter, and sidewalk to the railroad right of way from its existing limits. Create a bike and ped pathway connection to the end of high street and the railroad station parking lot through UPRR right of way.

Phase 1 – Construction of Roadway Emily Street Extension, Sidewalk Installation behind FS1, and application for UPRR ROW Phase 2 – Construction of Multimodal connection
Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 0 0 0 200,000 200,000
Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 0 0 0 200,000 200,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Revenue Measure 0 0 0 0 200,000 200,000
CIP# 89 Financial Plan Page 458

Page 886 of 970 ends

Capital Improvement Plan
Project Number Project Name
91252 Prado Road Bridge & Road Widening
Project Classification Classification Description
CIP Project Function Infrastructure & Transportation
Major City Goal Housing and Homelessness
Partnership Project Yes
Project Classification Transportation
Project Type Asset Replacement
Purpose and Need
The bridge over San Luis Obispo Creek at Prado Road is functionally obsolete and cannot accommodate future City needs. This project proposes to replace the bridge with a wider section while armoring San Luis Obispo Creek to maximize its hydraulic capacity.

Additionally, the intersection at Prado and South Higuera will be widened with protective features for bicycles and pedestrians to operate in conjunction with the widened bridge.

Cost Budget 2023-24 2024-25 2025-26 2026-27 2027-28 Total Contract Services 0 18,373,000 7,750,000 0 0 26,123,000 Fund 2023-24 2024-25 2025-26 2026-27 2027-28 Total
401 - Capital Outlay Fund 0 8,065,000 7,750,000 0 0 15,815,000 405 - Infrastructure Invest
CIP Fund 0 10,000,000 0 0 0 10,000,000
503 - Airport Area Impact
Fee Fund 0 126,000 0 0 0 126,000
507 - Transportation Impact
Fee Fund 0 182,000 0 0 0 182,000
Funding Source 2023-24 2024-25 2025-26 2026-27 2027-28 Total AASP Impact Fee Fund 0 126,000 0 0 0 126,000
Federal HBP Grant 0 6,000,000 0 0 0 6,000,000
General Capital Outlay 0 0 5,000,000 0 0 5,000,000
Infrastructure Investment
Fund 0 10,000,000 0 0 0 10,000,000
Local Revenue Measure 0 0 2,750,000 0 0 2,750,000
State or Federal Grant 0 2,065,000 0 0 0 2,065,000
Transportation Development
Impact Fee 0 182,000 0 0 0 182,000
CIP# 90 Financial Plan Page 459

Page 887 of 970 ends
← All documents from this meeting