Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 34
other hardscape materials would require the use of jackhammers and small tractors/bobcats to transport material to haul trucks.

Because the Project islocated within a Residential (R)‐1 zone, asstated above, Section 14.04.07 of the San Marino Municipal Code requires that equipment operation or outside construction and repair must not exceed 65 decibels (dB) when originating from any parcel in an R‐1 Zone without a permit from the planning and building director.

Noise sensitive uses near the Project site include the Crowell Public Library which is located adjacent to and east of the SMC. Existing school buildings and single‐family residences are located 200‐300 feet west, south and east of the site. Based on the Project’s noise study (refer to Appendix D in the 2022 Initial Study, located in Appendix F of this DEIR), construction and operational noise is anticipated to be greater than 95 dBA at the property line but will attenuate to less than 68 dB at 250 feet, or in the vicinity of the school and the residences.

Therefore, because the Project may exceed 65 dB at the property line, Mitigation Measure NOI‐1 is required to comply with the City’s code for projects that exceed 65 dB at the property line. This mitigation measure requires the contractor to institute noise reduction best management practices during construction would reduce impacts to less than significant.

Ground‐borne vibration levels in excess of 94 Vibration Velocity Level (VdB) would damage buildings extremely susceptible to vibration damage. The SMC building is included on the California Register of Historic Places and eligible for inclusion in the National Register of Historic Places; and thus, may be susceptible to vibration damage. However, no construction activities with the potential to generate significant ground vibration above 94 VdB, would be required to complete the proposed improvements.

Based on the analysis in the 2022 Initial Study, vibration levels would not reach or exceed levels required to cause any structural damage or related impacts to the SMC or adjacent Crowell Public Library.

Additionally, vibration levels would be below the 72 VdB threshold required to be perceptible at neighboring residences.

All impacts were determined to be less than significant with Mitigation Measure NOI‐1, and no further analysis or mitigation is required.

4.14 POPULATION AND HOUSING
Potential impacts to Population and Housing were fully evaluated in Section 4.14 of the 2022 Initial Study in accordance with the Section XIV of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form.

The thresholds addressed are as follows:
 XIV.a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?  XIV.b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere?
The Proposed Project is to improve the SMC which serves the recreational needs for the citizens of the city. The Project would not provide housing or make other infrastructure improvements. Therefore, the proposed Project would not induce population growth. The Project does not involve the removal or replacement of housing.

Page 141 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 35
All impacts were determined to be less than significant, and no further analysis or any mitigation is required.

4.15 PUBLIC SERVICES – POLICE, FIRE, LIBRARY
Potential impacts to Public Services were fully evaluated in Section 4.15 of the 2022 Initial Study in accordance with the Section XV of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The threshold requires an analysis of various public servicessuch as fire protection, police protection, schools, recreation/parks, and other public facilities as follows:

XV.a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection, Police protection, Schools, Recreation/Parks, Other public facilities? The Proposed Project islocated within 0.5 mile of City police and fire services. No expansion of emergency services is anticipated because the Project is a remodel of an existing building. And though one of the goals and objectives of the Project is to increase the usage of the SMC through providing a more modern facility, the amount of increase of water and wastewater is not significant because the increased use will be temporary and intermittent.

With respect to schools, the Proposed Project will not increase population growth. Therefore, there is no need for additional schools. Because parking for the SMC is within the Huntington Middle School parking lot through a parking agreement with the SMUSD, the 2022 Initial Study evaluated the potential effects of concurrent events when both the SMC and the Huntington Middle School may hold large events at the same time (such as a wedding or conference at the SMC at the same time as an athletic event at the school) to determine if the operation of the SMC would reduce the ability of the school to operate its programs. Following an analysis, feasible mitigation measures were developed to ensure coordination between the City and the Huntington Middle School to reduce the potential for conflicts that may interfere with the school’s ability to provide services, thereby necessitating additional parking facilities.

All impacts were determined to be less than significant once mitigation was incorporated.

However, comments were received during the NOP scoping that requested more information on the topic of impacts to schools given that there is a shared parking agreement. Therefore, additional discussion and analysis on potential impacts to Schools is provided in Section 5 of this DEIR based on comments received during the NOP scoping process.

4.16 RECREATION
Potential impactsto Recreation were fully evaluated in Section 4.16 of the 2022 Initial Study in accordance with the Section XVI of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The threshold requires an analysis of various public services such as fire protection, police protection, schools, recreation/parks, and other public facilities as follows:
 XVI.a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?

Page 142 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 36
 XVI.b) Doesthe project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? The Project does not propose any residential use or other land use that may generate a population that would increase the use of existing neighborhood and regional parks, or other recreational facilities, including the SMC. The Project will improve an existing community center and will not expand the SMC or construct new recreational facilities.

All impacts were determined to be less than significant, and no further analysis or any mitigation is required.

4.17 TRANSPORTATION
Potential impacts to Transportation were fully evaluated in Section 4.17 of the 2022 Initial Study in accordance with the Section XVII of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The thresholds addressed are as follows:
 XVII.a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?  XVII.b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)?  XVII.c) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?  XVII.d) Result in inadequate emergency access?
With respect to XVII.a), the 2022 Initial Study identified that the Proposed Project was consistent with the City’s General Plan which addresses the circulation system. No mitigation was required. However, commenters during the NOP process requested that the DEIR provide additional explanation and analysis for this threshold. Therefore, this specific threshold is further discussed in Section 5 of this DEIR.

With respect to XVII.b), the 2022 Initial Study identified that the proposed Project meets the criteria to be screened out of vehicles miles traveled (VMT) analysis as it will serve the local population and is considered a community institution, thereby shortening travel distances and reducing VMT. No mitigation was required. However, commenters during the NOP process requested that the DEIR contain additional explanation and analysisfor thisthreshold. Therefore, thisspecific threshold isfurther analyzed in Section 5 of this DEIR.

With respect to XVII(c), the 2022 Initial Study identified that Project improvements occur solely off highway and no road improvements are planned. Traffic may be temporarily slowed or diverted around the work site during utility installation, but all State traffic controls would be in place for the time of any construction that must occur in the street. There was no impact, and no further analysis or any mitigation is required for this criterion.

With respect to XVII.d), all access lanes will meet City requirements pursuant to the Uniform Building and Fire Code to ensure adequate emergency access throughout the Project site. The impacts were determined to be less than significant, and no further analysis or any mitigation is required for this criterion.

Page 143 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 37

4.18 TRIBAL CULTURAL RESOURCES
Potential impactsto Tribal Cultural Resources were fully evaluated in Section 4.18 of the 2022 Initial Study in accordance with the Section XVIII of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form.

The thresholds addressed are as follows:
 XVIII.a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or  XVIII.b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

A Native American Heritage Commission (NAHC) search of its Sacred Lands and a tribal consultation were completed as part of the 2022 Initial Study. The NAHC responded stating that the search of its Sacred Lands File revealed positive results and to contact the Gabrieleno Band of Mission Indians – Kizh Nation.

Following consultation with the Kizh Nation that identified that there are no known resources on the Project site but there is high potential for buried resources, Mitigation Measures TCR‐1, TCR‐2, and TCR‐ 3 were imposed. These measures consist of tribal monitoring during the utility excavations, and procedures for potential finds.

All impacts were determined to be less than significant with Mitigation Measures TCR‐1, TCR‐2 and TCR‐ 3, and no further analysis or additional mitigation is required.

4.19 UTILITIES AND SERVICE SYSTEMS
Potential impacts to Utilities and Service Systems were fully evaluated in Section 4.18 of the 2022 Initial Study in accordance with the Section XVIII of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The thresholds addressed are as follows:
 XVIII.a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?  XVIII.b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
 XVIII.c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments?
 XVIII.d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?  XVIII.e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
The SMC is served by all existing utilities. Minor modifications of the utilizes planned as part of the Project include replacing the overhead electrical service with an underground electrical service, including a minor electrical upgrade to today’s standards, and a new landscaping water service and meter to replace the existing irrigation lines. Additional water lines will be run to service the new fire sprinkler system.  These

Page 144 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 38
upgrades are minor modifications and do not represent a significant increase over service capacity that is currently provided.

Usage of water, wastewater and landfill services may slightly exceed current demand with the anticipated increase in usage and recreational staff offices, however, utility providers are anticipated to have adequate supply to serve this minor incremental demand.

All impacts were determined to be less than significant, and no further analysis or any mitigation is required.

4.20 WILDFIRE
Potential impacts to Wildfire were fully evaluated in Section 4.20 of the 2022 Initial Study in accordance with the Section XX of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The thresholds addressed are as follows:
 XX.a) Substantially impair an adopted emergency response plan or emergency evacuation plan?  XX.b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of wildfire?  XX.c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
 XX.d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post‐fire slope instability, or drainage changes? The Proposed Project is not located within a very high fire hazard severity zone as identified CalFire or the City of San Marino. The nearest potential wildfire area is located approximately 3 miles east in the Kewen Canyon/Kewen Drive area. The San Marino Police Department, California Highway Patrol, and other cooperating law enforcement agencies have primary responsibility for evacuations, and the SMC may be used as an evacuation center if needed.

All impacts were determined to be less than significant, and no further analysis or any mitigation is required.

Page 145 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 39
5 ENVIRONMENTAL IMPACTS ANAYSIS
Pursuant to CEQA Guidelines (14 CCR 15000 et seq.), this DEIR consists of an evaluation of the effects of the entire Proposed Project. In the evaluation of all impacts of the Proposed Project for this DEIR, the analysis contained in the 2022 Initial Study is incorporated by reference and forms the basis for summarizing information where appropriate in this DEIR.

The CEQA Guidelines, Appendix G ‐ Environmental Checklist Form, criteria were used in the 2022 Initial Study evaluation. For brevity, this section summarizes the issues addressed in the 2022 Initial Study.

Of the 20 categories addressed in the 2022 Initial Study, criteria in two categories (Cultural Resources and Land Use and Planning) were determined to be Potentially Significant with no feasible mitigation measures to reduce impacts to less than significant. Criteria in two other categories, Transportation and Public Services, are included in this DEIR in response to comments received during the NOP/scoping process.

Table 5‐1: CEQA Checklist and Initial Study Matrix – Significant Effects identifies the specific CEQA Checklist criteria and 2022 Initial Study sections that are the subject of the environmental evaluation of this DEIR section.

Table 5‐1: CEQA Checklist and Initial Study Matrix – Significant Effects CEQA Guidelines Checklist
Section and Criteria Issue
Summary
Initial
Study
Section
Initial Study
Finding
Mitigation Measures in Initial
Study to Reduce Impacts to
Less Than Significant
DIER Section
V. Cultural Resources
(a) Significant impact on
listed Historical Resources

4.5 Potentially
Significant
No feasible mitigation
measures.

5.1 XI. Land Use and Planning
(b) Conflict with any land use
plan, policy, or regulation.

4.11 Potentially
Significant
No feasible mitigation
measures.

5.2 XV. Public Services:

Schools: Require new or
altered facilities to maintain
acceptable level of service.

4.15 Less Than
Significant
With
Mitigation
Incorporated
PS‐1, PS‐2, PS‐3, PS‐4, PS‐5 5.3
XVII. Transportation
(a) Conflict with a program,
plan, ordinance or policy
addressing the circulation
system.
(b) Be inconsistent with
Vehicle Miles Traveled
analysis

4.17 Less Than
Significant
No mitigation measures
required to reduce potential
impacts.

5.4

Page 146 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 40

5.1 CULTURAL RESOURCES

5.1.1 Introduction
For this subject area, the 2022 Initial Study (Appendix F) analysis indicated that potential Project impacts to the threshold criteria of archaeological resources and human remains were considered less than significant, and no further evaluation was warranted. However, the 2022 Initial Study analysis concluded that for the threshold criterion of historic resources, the Project could potentially have a significant unavoidable impact because the Proposed Project would alter an identified historic resource. Therefore, this section focuses the analysis on impacts to historic resources.

Cultural resources include archaeological sites, buildings and other kinds of structures, historic districts, cultural landscapes, and resources important to specific ethnic groups.

Archaeological sites represent the material remains of human occupation and activity either prior to European settlement (prehistoric sites) or after the arrival of Europeans (historical sites).

The historic built environment includes buildings used for habitation, work, recreation, education and religious worship, and may be represented by houses, factories, office buildings, schools, churches, museums, hospitals, bridges and other kinds of structures.

An historic district is any “geographically definable area, urban or rural, possessing a significant concentration, linkage, or continuity of sites, buildings, structures, or objects united by past events or aesthetically by plan or physical development. A district may also comprise individual elements separated geographically but linked by association or history” (36 CFR 60.3).

The National Park Service defines a cultural landscape as “a geographic area, including both cultural and natural resources and the wildlife or domestic animals therein, associated with a historic event, activity, or person or exhibiting other cultural or aesthetic values”.

5.1.2 Regulatory Setting
The National Historic Preservation Act (NHPA) of 1966, as amended, and the California Public Resources Code (PRC), Section 5024.1, are the primary federal and state laws and regulations governing the evaluation and significance of historical resources of national, state, regional, and local importance.

National Historic Preservation Act
Section 106 (Protection of Historic Properties) of the NHPA requires federal agencies to take into account the effects of their undertakings on historic properties. The Advisory Council on Historic Preservation, an independent federal agency, administers the Section 106 review process with assistance from State Historic Preservation Offices to ensure that historic properties are considered during federal project planning and implementation. In June 2011, the SMC underwent a Section 106 review as part of a project to install an ADA compliant door and other features, which was funded through the U.S. Department of Housing and Urban Development through the County of Los Angeles Community Development Block Grant program.

Page 147 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 41
National Register of Historic Resources (National Register) The National Register of Historic Places is the nation's official list of buildings, structures, objects, sites, and districts worthy of preservation because of their significance in American history, architecture, archeology, engineering, and culture. The National Register recognizes resources of local, state and national significance which have been documented and evaluated according to uniform standards and criteria.

Authorized under the NHPA, the National Register is part of a national program to coordinate and support public and private efforts to identify, evaluate, and protect historic and archeological resources. The National Register is administered by the National Park Service, which is part of the U. S. Department of the Interior.

As defined in National Register Bulletin #15, “How to Apply the National Register Criteria for Evaluation,” resources are eligible for the National Register if they:

A) are associated with events that have made a significant contribution to the broad patterns of our history; or
B) are associated with the lives of significant persons in or past; or C) embody the distinctive characteristics of a type, period, or method of construction, or that represent the work of a master, or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual distinction; or D)   have yielded or may be likely to yield, information important in history or prehistory.

Once a resource has been determined to satisfy one of the above‐referenced criteria, then it must be assessed for integrity. Integrity refers to the ability of a property to convey itssignificance, and the degree to which the property retainsitsintegrity, including physical and visual attributes, for which it issignificant under the four basic criteria. The National Register recognizes seven aspects or qualities of integrity:
location, design,setting, materials, workmanship, feeling, and association. To retain its historical integrity, a property must possess several, and usually most, of these aspects.

California Register of Historical Resources
The California Register program encourages public recognition and protection of resources of architectural, historical, archeological and culturalsignificance, identifies historical resourcesforstate and local planning purposes, determines eligibility for state historic preservation grant funding and affords certain protections under the California Environmental Quality Act The California Register was established to serve as an authoritative guide to the state’s significant historical and archaeological resources (Public Resources Code § 5024.1). The California Office of Historic Preservation (OHP), as an office of the California Department of Parks and Recreation (DPR), implements the policies of the NHPA on a statewide level.

Page 148 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 42
State law providesthat in order for a property to be considered eligible for listing in the California Register, it must be found by the Office of Historic Preservation (OHP) to be significant under any of the following four criteria (14 Cal. Code of Regulations § 4852 (a)):
1) It is associated with the eventsthat have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States; 2) It is associated with the lives of persons important to local, California, or national history; 3) It embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of a master, or possesses high artistic values; and/or 4) It has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California, or the nation.

In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resources.” (14 Cal. Code of Regulations § 4852 (d)(2).) Fifty years is normally considered sufficient time to be considered a potential historical resource. All resources older than 45 years will be evaluated.

The California Register also requires that a resource possess integrity, which is defined as the ability for the resource to convey its significance through seven aspects: location, setting, design, materials, workmanship, feeling, and association.

All resources listed on or formally determined eligible for the National Register are automatically listed in the California Register, in accordance with the California Office of Historic Preservation policies (OHP, March 2001). In addition, properties designated under municipal or county ordinances or through local historic resources surveys, are eligible for listing in the California Register.

City of San Marino Local Register of Historic Resources Chapter XXIII, Article 18 of the San Marino City Code is designed to “promote the public health, safety, and general welfare by providing for the identification, designation, protection, enhancement, and ongoing use of historical resources that represent the City's cultural, architectural, social, economic, and political heritage.”
Chapter XXIII, Article 18 of the San Marino City Code, Section 23.18.03 (A)states: “Automatic Designation:

Any property within the City that is listed in the National Register of Historic Places or the California Register of Historic Places is automatically designated as a historic landmark for purposes of this article.”

Page 149 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 43

5.1.3 Environmental Setting
This section provides a summary of the information provided in the 2022 Initial Study and in the Project Cultural Resources Assessment (refer to Appendix C of the 2022 Initial Study, located in Appendix F of this DEIR).

History
The first significant European settlement of California began during the Spanish Period (1769 to 1821) when 21 missions and four presidios were established between San Diego and Sonoma. The land of the City of San Marino, which was part of the San Gabriel Mission, was initially occupied by Gabrielino (Tongva) Indians, who had a village located on what is now the Huntington School.

In 1852, Tennessee native Benjamin Davis Wilson acquired a vast tract of land that included the area that later became San Marino as well as several neighboring towns. In 1873, Benjamin Wilson gave 500 acres of his land to his son in law James Debarth Shorb, who then named the ranch on his land “San Marino” which was inspired by his grandfather’s plantation in Maryland which in turn got its name from the Republic of San Marino, Italy.

In 1903, the San Marino land was purchased from James Shorb by Henry E. Huntington, a businessman who was the owner of the Pacific Electric Railway Company in Southern California. Henry Huntington played a major role in shaping the economy of Southern California. Huntington and George Patton Sr. joined with another landowner to incorporate San Marino in 1913. They also spearheaded a campaign to prevent their properties from being developed by the city.

In 1904, Pacific Electric (PE), which was owned by Henry Huntington, built a double track rail line commencing at a connection with the Monrovia Line at Huntington Drive in San Marino northerly on private way to a point near Colorado Street, Pasadena. The line opened for service on March 19, 1904.

The city’s irregular street grid pattern reflects its historic patterns of residential development, which were largely guided by Huntington and oriented around the Pacific Electric Railway (PERy) routes he constructed in the City between 1903 and 1906. Most of the street grid skews northwest/southeast, roughly perpendicular to the northeast/southwest route of Huntington Drive (the PERy’s Monrovia‐ Glendora route). The grid in the northeast portion of the city is skewed in response to the PERy’s Sierra Madre line (now Sierra Madre Boulevard). The northwest part of San Marino, containing the most prominent hills and the largest lots, is marked by curvilinear streets responding to the natural contours of the landscape (ARG, 2020).

Rail operation continued until October 6, 1950, when the line was abandoned in favor of motor coaches.

The median of what is now Huntington Drive was part of this line and was developed with grass and trees after the PERy’s abandonment. The roadways on either side of the median were reconfigured from bidirectional traffic to one‐way traffic.

San Marino Women’s Club
During the 1930s, there were many organizationsin the community in San Marino that gathered for music, book reviews, and various other activities. However, there were few organizations for women. On June

Page 150 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 44
8th, 1936, a group of 52 women gathered at the San Marino Police Department courtroom to organize a local women’s club. By the time the San Marino Woman’s Club was completely organized, the club already had around 420 members (San Marino Tribune, January 7, 2016). The club catered to elite married white women who could afford to pay the $10 dues and had time to attend frequent events and do charity work.

Most of these women had live‐in domestic help in the 1930s and 1940s; those who took on leadership roles were in their forties and fifties, with grown or nearly‐grown children.

The San Marino Woman’s Club members were required to wear black dresses and black hats with a pair of white gloves. There were 16 different guilds within the club: music, drama, literature, writers, home craft, philanthropy, foreign language, current events, travel, bible, home interior, language, sports, public affairs, flower, and garden. Regular meetings were held at the Henry E. Huntington Middle School auditorium while the guild meetings were held at homes of the members. The club raised funds for a slightly used ambulance, which it donated to the city in 1940. This was just one of many charitable contributions the group made to the community over the decades.

In 1939, the club purchased the property at 1800 Huntington Drive for $6,000 to build a clubhouse for its growing membership. At the time, the property held a residence and was surrounded by open fields.

Members raised most of the funds to complete the clubhouse through bazaars, rummage sales, parties, and various entertainment events over a 10‐year period. Fundraising efforts were suspended when the US entered World War II in 1942, and construction remained difficult immediately after the war in the late 1940s. They also made an appeal to the public for funds. In 1949, the club requested and received variances from San Marino City Council because the parcel was zoned for residential use and required setbacks that did not fit in with the club’s plans for the property. By the end of the decade, the club had $57,000 on hand, and was able to borrow an additional $35,000 in 1951 to construct the clubhouse, which was completed in 1952.

In addition to club meetings and events, the facility was used for a variety of community and private functions such as wedding receptions and sorority events. Over the years, the club’s charitable contributions were numerous and included the endowment of a bed at the Orthopedic Hospital, nursing scholarships, Toys for Tots, and others. They also provided help to the Assistance League, American Red Cross and the City of Hope.

The San Marino Woman’s Club moved its organization to Pasadena in 2004, and the City purchased the building in 2005.

Project Site Area Development
The SMC was constructed in approximately 1951/52. Adjacent to the SMC are the Crowell Library (east) which was constructed in 1951/52, at about the same time as the construction of the SMC. The Henry E.

Huntington Middle School (constructed in 1918) is located directly west and south of the SMC, and the Valentine Elementary School (west of the middle school), constructed in 1938, and the San Marino Unified School District offices, located within the middle school grounds. The Crowell Library was reconstructed to its current design between 2006 and 2008.

Page 151 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 45
Cultural and Archaeological Resources Study and Results For the 2022 Initial Study, BCR Consulting conducted a survey of the Project site through a field survey and a records search (refer to Appendix C of the 2022 Initial Study, located in Appendix F of this DEIR).

The records search was conducted at the South Central Coastal Information Center and through review of various other State, federal and local databases for the Project site and a 1‐mile radius.

The records search revealed that in June 2011 the SMC underwent a required historical review as part of a project to install an ADA compliant door and other features, which was being funded through the U.S.

Department of Housing and Urban Development through the County of Los Angeles Community Development Block Grant program.

The SMC’s architectural style was identified in the 2011 study as “Modern Colonial Revival,” which is not recognized as a unique style of architecture. Designed by architect Marion Varner as one of his earlier designs, the SMC large primarily one‐story building with a flat roof and raised parapet along the rear and side elevations. The front elevation features a side‐facing medium gable roof with an offset front gable wing. An L‐shaped porch runs across the front elevation and is supported by decorative wrought iron posts. The roof is covered with wood shingles. A large multi‐paned steel framed window is located below the main front gable. Underneath the window is brick trim. A tall exterior brick chimney is located on the northeast elevation. Windows are primarily multi‐paned steel casements. Siding is stucco and foundation is concrete. The interior of the building when first built contained a large auditorium, dining room, meeting room and office. There were two additions in 1958 and a separate modular building in rear, constructed at an unknown date.

The 2011 study identified that the integrity of the building appeared sufficient for eligibility to the National Register of Historic Places as follows:
 Location: The property at 1800 Huntington Drive is in its original location.  Setting:  The historic setting of the property was found to be partially intact. The relationship to the adjacent library and school remain. However, the original 1950 library was replaced with a new library building within the last several years.
 Design:  The original design of the 1952 building was primarily intact except for changes to the front entrance doors and two small additions in 1958 done in the same style.  Materials:  The integrity of materials was found to be somewhat intact.  Feeling and Association:  The feeling and association as a woman’s club was no longer intact since the building is now the San Marino Community Center, but it continues to function to serve the community.

The California OHP concurred with this recommendation on August 5, 2011 and also formally listed the SMC in the California Register of Historical Resources (California Register) under Criterion 1, for association with an event important to the history of the San Marino community. The OHP identifies the SMC as being listed on the California Register through its listing on the State’s Built Environment Resource Directory (BERD).

During the 2021 fieldwork, BCR Consulting confirmed that that the SMC retained the integrity to convey its historic significance as identified in 2011. No other cultural or archaeological resources were identified within the subject property boundaries.

Page 152 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 46

5.1.4 Thresholds of Significance
Potential impacts to Cultural Resources were fully evaluated in Section 4.11 of the 2022 Initial Study in accordance with the Section V of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The threshold addressed in this DEIR is as follows:
 V.a) Cause a substantial adverse change in the significance of a historical resource as defined in 15064.5?

5.1.5 Impact Analysis
Section 15064.5(a) of the CEQA Guidelines defines historical resources, which includes: A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources (Pub. Res. Code § 5024.1, Title 14 CCR, Section 4850 et seq.).

Public Resources Code Section 5020.1(q) defines “Substantial adverse change” as the demolition, destruction, relocation, or alteration such that the significance of an historical resource would be impaired. CEQA Guidelines Section 15064.5 (b)(1) and (b)(2) clarify that the impairment must be material and states that material impairment of a historical resource would occur when the Project “demolishes or materially alters, in an adverse manner, those physical characteristics of an historical resource that convey its historical significance and that justify its inclusion in, or eligibility for, inclusion in the California Register of Historical Resources.”
The SMC was formally listed in the California Register of Historical Resources (California Register) under Criterion 1, for association with an event important to the history of the San Marino community. The OHP identifies the SMC as being listed on the California Register through its listing on the State’s BERD.

The SMC is also a City landmark pursuant to the San Marino City Code, Chapter XXIII, Article 18 Section

23.18.03 (A) “Automatic Designation.”
The Project includes changing the exterior architectural design of the SMC building to better match the architectural style of the adjacent Crowell Public Library, Henry E. Huntington Middle School and San Marino Unified School District offices. For example, the existing wood shake roof would be replaced with tile, and the decorative wrought iron posts would be changed to stucco columns. The SMC will remain a community center, open for community events, club meetings, City recreation staff offices, and City recreation classes.

Because the SMC is eligible for listing to the National Register, islisted on the California Register of Historic Resources; and is therefore automatically considered a City landmark, CEQA Guidelines Section 15064.5(b)(3)states that a project that follows the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer (referred to as “Secretary’s Standards”), “shall be considered as mitigated to a level of less than a significant impact on the historical resource.” The Secretary’s Standards are intended to pertain to rehabilitation projects in a reasonable manner, taking into consideration economic and technical feasibility.

Page 153 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 47
Additionally, San Marino City Code Section 23.18.08 discusses proceduresfor the City to issue a Certificate of Appropriateness for rehabilitation of historic structures. One requirement is that the project is consistent with the Secretary's Standards and any applicable design guidelines adopted by the City.

The 2022 Initial Study determined that the Proposed Project does not qualify as a preservation or rehabilitation project under the Secretary’s Standards as currently designed (refer to the Section 4.5 Cultural Resources of the 2022 Initial Study and Appendix C of the 2022 Initial Study, both of which are located in Appendix F of this DEIR). As identified in the 2022 Initial Study, the proposed Project would materially alter a number of the physical characteristics of the SMC that convey its historical significance and that justify its inclusion in the California Register of Historical Resources. Therefore, the proposed Project, as currently designed, will cause a substantial adverse change in the significance of a historical resource.

5.1.6 Mitigation Measures
The CEQA Guidelines Section 15126.4(b) addresses impacts to historical resources and mitigation alternatives as follows:
(1) Where maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of the historical resource will be conducted in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer, the project's impact on the historical resource shall generally be considered mitigated below a level of significance and thus is not significant. (2) In some circumstances, documentation of an historical resource, by way of historic narrative, photographs or architectural drawings, as mitigation for the effects of demolition of the resource will not mitigate the effectsto a point where clearly no significant effect on the environment would occur.

Mitigation Measure CUL‐1 was identified in the 2022 Initial Study to accommodate unanticipated archaeological and paleontological finds. Therefore, the Proposed Project would require implementation of Mitigation Measures CUL‐2, CUL‐3, and CUL‐4 as follows to address impact to historical resources.

CUL‐2:  Documentation. Prior to the issuance of demolition or site permits, the project sponsors shall undertake Historic American Building Survey (HABS) documentation of the subject property, structures, objects, materials, and landscaping. The documentation shall be undertaken by a qualified professional who meets the standards for history, architectural history, or architecture (as appropriate), as set forth by the Secretary of the Interior’s Professional Qualification Standards (36 CFR, Part 61). The documentation shall consist of the following:
 Measured Drawings: A set of measured drawings that depict the existing size, scale, and dimension of the subject property. The Planning Department Preservation staff will accept the original architectural drawings or an as‐  built set of architectural drawings (plan, section, elevation, etc.). The Planning Department Preservation staff will assist the consultant in determining the appropriate level of measured drawings;

Page 154 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 48
 HABS‐Level Photography: Digital photographs of the interior and the exterior of subject property. Large format negatives are not required. The scope of the digital photographs shall be reviewed by Planning Department Preservation staff for concurrence, and all digital photography shall be conducted according to the latest National Park Service Standards. The photography shall be undertaken by a qualified professional with demonstrated experience in HABS photography; and  HABS Historical Report: A written historical narrative and report, per HABS Historical Report Guidelines.
 Video Documentation: Video footage of the exterior and interior of contributing elements of the subject property.

The professional shall prepare the documentation and submit it for review and approval by the Planning Department Preservation staff prior to Project construction. The documentation shall be deposited to local historical repositories including but not limited to Pasadena Museum of History.

CUL‐3: Interpretation. The City shall provide a permanent display of interpretive materials within the SMC concerning the history and architectural features of the original SMC building and its relationship with the City of San Marino’s history. Interpretation of the site’s history and relationship with the City shall be supervised by an architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards and may engage additional consultants to develop the display. The interpretative materials (which may include, but are not limited to, a display of photographs, news articles, memorabilia, and/or video) shall be placed in a prominent setting within the SMC, such as the lobby or Fireside Room of improved building. A proposal describing the general parameters of the interpretive program shall be approved by the City of San Marino Community Development Department staff prior to occupancy.

CUL‐4: Salvage. Prepare an in‐depth salvage document for the character‐defining features of the SMC. The City shall work with a professional who meets the Secretary of Interior’s Standards to develop a salvage report that documents the building’s character‐defining features for conservation and assesses the feasibility of reinstallation at the SMC or in other City facilities. The salvage report shall include documentation of interior and exterior historic character‐defining features that would not be retained by the Project.

The professional shall prepare the salvage report and submit it for review and approval by the Community Development Department staff prior to the initiation of Project construction.

5.1.7 Level of Significance After Mitigation
CEQA Guidelines Section 15126.4(b)(2) states that completion of historic narratives, photographs or architectural drawings does not mitigate the impacts to less than significant. This is because the proposed Project is similar to a demolition type project in that it will remove building features that convey its historical significance in accordance with its listing on the California Register of Historic Resources.

Page 155 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 49
Therefore, even with the implementation of the mitigation measures CUL‐2, CUL‐3 and CUL‐4, the impact to historic resources would not be reduced to a less than significant level.

Therefore, the Proposed Project, as currently designed, will cause a substantial adverse change in the significance of a historical resource because the Project will materially demolish or materially alter in an adverse manner those physical characteristics of an historical resource that convey its historical significance and that justify itsinclusion in, or eligibility for, inclusion in the California Register of Historical Resources, as identified in CEQA Guidelines Section15064.5 (b)(1) and (b)(2).

The level of significance of the impact to historic resources is Potentially Significant after mitigation is incorporated.

Statement of Overriding Considerations
The City has the discretion to balance the benefits of a project against its unavoidable significant environmental impacts in considering whether to approve a project under CEQA. The City may approve a project with significant impacts if they adopt a Statement of Overriding Considerations finding that the project's benefits outweigh the unmitigated impacts. Project benefits may include economic, legal, social, and other considerations. Based on the identification of significant impacts to historic resources, the City would need to adopt a Statement of Overriding Considerations to approve the Proposed Project.

5.1.8 Cumulative Impacts
The City’s General Plan identifies other facilities within the City of San Marino that have a State historic register designation. However, no improvements to those facilities are proposed that would create a cumulative impact to a historic resource. The Proposed Project impacts are limited to one resource.

Therefore, the cumulative impact of materially altering a historical structure is less than significant, and no further analysis or mitigation is required.

Page 156 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 50

5.2 LAND USE AND PLANNING

5.2.1 Introduction
For this subject area, the 2022 Initial Study (Appendix F) analysis indicated that there were no potential Project impacts to the threshold of the Project physically dividing a community, and no further evaluation was warranted. However, the 2022 Initial Study analysis concluded that for the threshold of if the Project conflicts with land use policies, the Project could have a potentially significant unavoidable conflict with the current General Plan goals and policies relative to preservation of a historic resource. Therefore, this section focuses the analysis on the Project’s conflicts with land use policies.

5.2.2 Regulatory Setting
General Plan
The City’s General Plan, adopted in October 2003, identifies Goals, Policies and Implementation measures that guide the City’s actions. “Goals” represent a synthesis of input from those who live and work in the City of San Marino and define desired General Plan outcomes. “Policies” provide the overall direction for choosing among alternative courses of action necessary to achieve the Goals while also providing a measure of flexibility needed to adapt the action to changes over the life of the General Plan. “Implementation Measures” are specific, discreet actions the City may take to achieve the future conditions reflected in the General Plan element. Implementation Measures define the municipal work program for providing transportation improvements needed to meet Goals identified in the General Plan element, consistent with the element’s policies.

City Ordinances
As discussed in DEIR Section 5.1, the California OHP identifies the SMC as being listed on the California Register through its listing on the State’s BERD. The SMC is also considered a City Landmark pursuant to City of San Marino Municipal Code, Chapter XXIII, Article 18, Section 23.18.03 (A), which states:
“Automatic Designation: Any property within the City that is listed in the National Register of Historic Places or the California Register of Historic Places is automatically designated as a historic landmark for purposes of this article.”
Chapter XXIII, Article 18, Section 23.18.07 of the San Marino City Code also identifies that no alteration, restoration, rehabilitation, construction, removal, relocation, or demolition of any historic landmark shall occur unless the City has first issued a Certificate of Appropriateness (Certificate) or Certificate of Economic Hardship. The Community Development Director can issue the Certificate with the following findings:
a. The project will not cause a substantial adverse change in the significance of a historic landmark within the meaning of the California Environmental Quality Act as determined by the commission and the Council;
b. The project is consistent with the provisions of this article; and c. The project is consistent with the Secretary's Standards and any applicable design guidelines adopted by the City.

Page 157 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 51

5.2.3 Environmental Setting
The Project site is located within the City limits and is zoned R‐1, Residential. The Project proposes to improve an existing City building that is used for recreation. According to Section 23.02.01 of the San Marino Municipal Code, recreational and childcare activities may be conducted by the City of San Marino on properties in residential zones that are owned by the City.

The City acquired the building in 2005 from the San Marino Women’s Club to use for City recreation programs. In January 2018, the City Recreation Commission began holding public discussions and extensive public outreach regarding re‐envisioning the City’srecreation program and enhancing the usage of the SMC. In 2018, the City Council adopted a strategic plan that identified developing a plan for the future of the SMC and appointed a “Blue Ribbon Committee” to evaluate the recreational programming.

In August 2019, conceptual plans were developed for the SMC. Between August and September 2020, the City surveyed the community regarding the needs and aesthetic appearance of the SMC. One of the survey questions asked the community if the City should restore the original 1950s exterior architecture or remodel it to match other adjacent buildings. Of the 209 responses received, the results indicated:
 Restore 1950 's 79
 Match Crowell Library 95
 Match Barth Athletic Center 4
 Do something different   10
 No response 21
The result of the outreach was that nearly equal portions of the community supported retaining the existing design or supported a more modern look. Given that there was no clear community consensus, the City Council, after deliberations, determined that redesigning the SMC to more closely align with the architectural style of the Crowell Public Library would more closely align with the overall City’s vision as identified in the General Plan, “to make our City more attractive, more desirable, and more responsive to the changing needs of its citizens.” An architect wasretained to provide the current plans which represent the Proposed Project.

5.2.4 Thresholds of Significance
Potential impacts to Land Use and Planning were fully evaluated in Section 4.5 of the 2022 Initial Study in accordance with the Section XI of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The threshold addressed in this DEIR is as follows:
 XI.b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?

5.2.5 Impact Analysis
The Project proposes to make both exterior and interior improvements to the SMC, which is eligible for listing to the National Register of Historic Places, is on the California Register of Historical Resources, and which is a City Landmark under San Marino City Code, Chapter XXIII, Article 18 Section 23.18.03 (A). The exterior upgrades will change the existing architecturalstyle of the building façade from “Modern Colonial

Page 158 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 52
Revival” to a “Spanish Mediterranean” architectural style which is similar to that of the adjacent Crowell Public Library to the east and the San Marino Unified School District buildings to the west.

This analysis focuses on the proposed changes and determines whether they are a substantial change in land use policy that would substantially conflict with the intent of the City’s General Plan, and the City ordinances relative to qualifying for a Certificate of Appropriateness. Although this DEIR will make a determination regarding the significance of the changes from a CEQA standpoint, ultimately, the City will determine whether the Proposed Project complies with the requirements to obtain a Certificate of Appropriateness in accordance with City ordinance.

Land Use Consistency
The Project’s Land Use Designation is Very Low Density Residential. In 1949, the San Marino Women’s Club requested and received variances from San Marino City Council because the parcel was zoned for residential use and the required setbacks did not fit in with the club’s plans for the property as a community center. The Project will not change the land use or use of the building as a public gathering space as it has existed for decades. Moreover, according to Section 23.02.01 of the San Marino Municipal Code, recreational and childcare activities may be conducted by the City of San Marino on properties in residential zones that are owned by the City.  Therefore, the Project is consistent with the City’s Land Use designation.

General Plan Consistency
When the Project is evaluated against the City’s goals and objectives of its General Plan and Circulation Element, the Project is generally consistent with the City’s Vision Statement, identified in the following excerpt from the General Plan:

The city government embraces the values of the community, and recognizes the need to make our City more attractive, more desirable, and more responsive to the changing needs of its citizens. Decision makers are accessible to residents. Although the City adapts to change in a deliberate way, its intent is to satisfy residents’ needs while protecting its financial resources.

Table 4.11‐1 in the 2022 Initial Study (Appendix F) evaluated Project’s consistency with the various Goals and Policies of the various elements of the General Plan. For the purposes of Table 4.11‐1 in the 2022 Initial Study, only those goals, policies and implementation measures that are applicable to the Project are identified.

In summary, Table 4.11‐1 of the 2022 Initial Study identified the following:
 Circulation Element:  Consistent.
 General Plan ‐ Land Use Chapter
o Section One ‐ Land Use Designations ‐ Consistent
o Section Three – Preservation ‐ Inconsistent
 General Plan – Community Services Chapter
o Section One – Recreational Services:  Consistent

Page 159 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 53
 General Plan – Safety Chapter
o Section Four – Noise: Consistent
In general, the General Plan’s Land Use Chapter, which includes Section Three – Preservation, identifies “Cultural Treasures” as The Huntington Library, Art Collections, and Botanical Gardens, The Old Mill, and Lacy Park. The General Plan was adopted in 2003, prior to the City’s purchase of the SMC in 2005 and prior to the 2011 listing of the SMC.

The City of San Marino identifiesthe following broad land use goalsin the Land Use Chapter of the General Plan. The objectives and policies of Land Use Chapter are intended to aid the City in reaching these goals:

1. Maintain the residential character of San Marino.

2. Protect the single‐family home pattern of development in San Marino neighborhoods.

3. Protect existing lot sizes and discourage lot subdivisions that are incompatible with the neighborhood in which they are located.

4. Support unique commercial areas  ‐  business activities should meet the needs of local residents while recognizing that some businesses are attractive regionally.

5. Perpetuate a healthy, but contained and limited, commercial environment as a service and convenience to San Marino residents, without detrimental encroachment upon the single‐family areas of the community.

6. Accommodate future needs for municipal facilities.

7. Protect existing and provide for more recreational space for residents.

8. Cooperate with The Huntington and support the Old Mill as local cultural resources.

9. Ensure high quality design characteristics of existing and proposed structures in San Marino.

10. Ensure that new development is compatible with established neighborhoods.

11. Preserve significant historic properties on the State Register and National Register.

12. Maintain the current standard of high‐quality and well‐maintained properties.

13. Maintain reasonable buffers between residential neighborhoods and commercial uses in the City.

14. Establish policies for on‐site parking for all uses and allow for adequate alternative parking sites for commercial uses.

15. Protect property values.

Therefore, the Project is consistent with the overarching guidelines for the Land Use Element, except for No. 11 which is the preservation of significant historic properties on the State Register and National Register.

Table 5‐2: General Plan Consistency Analysis – Land Use is an excerpt from Table 4.11‐1 contained in the 2022 Initial Study to focus specifically on General Plan Policies of the Land Use Element, Section Three – Preservation, and the Project’s consistency with those policies.

Page 160 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 54
Table 5‐2:  General Plan Consistency Analysis – Land Use General Plan Goal or Policy Project Consistency Analysis General Plan ‐ Land Use Chapter
Section Three ‐ Preservation
Goal:  Protect the historical and culturally significant resourcesthat contribute to community identity and
a sense of history.

Objective L.23   Review existing listed resources and
determine appropriate action for state and national
listings.

Policies:

Consider whether or not resources are
appropriately placed on current lists.

Recognize, publicize, and maintain the sites that
are locally significant.

Identify significant architectural, cultural, and
historic resources within the city that would qualify
for the state or national register.

Cooperate with the San Marino Historical Society
and other community groups involved in
recognizing the City’s history.

Inconsistent. The SMC is eligible to the National
Register of Historic Places, islisted on the California Register of Historic Resources, is a city landmark
per the Code, and was identified in a “Citywide
Historic Resources Survey Report.” The SMC was
identified to be the first community center in San
Marino. The Project consists of materially altering
the architectural design of the SMC in a manner
that is not consistent with the Secretary of the
Interior Standards for the Treatment of Historic
Properties. The proposed design, however, was a
result of significant City outreach effort among the
community groups – some of which agreed with
the revised architectural design and some of which
did not feel the architectural design should be
changed. Therefore, while the Project is consistent
with some of the polices identified in Section Three
of the Land Use Element, the Project is not
consistent with the Goal or Objective to, overall,
protect the resource. The City Council has the
ultimate authority to determine the appropriate
action for state and national listings.

Objective L.24    Encourage the preservation of
significant architectural, historic, and cultural
resources.

Policies:

Encourage the identification of areas and
structures of historic, architectural, and cultural
significance within the city.

Any designation based upon area, site or structure
within the city should be subject to the City’s
approval.

Any designation of a property within the City
should be subject to the property owner’s approval.

Inconsistent. The policies that support Objective
L.24 are related to the encouraging the
identification of historic properties. The Project will materially alter the SMC, a listed resource, in a
manner that would jeopardize its listing, making it
ineligible for listing in a future study.

Page 161 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 55
General Plan Goal or Policy Project Consistency Analysis Objective L.25  Encourage and provide incentives to
achieve preservation of significant architectural,
historical, and cultural buildings and neighborhoods.

Policies:

Support tax incentives and other methods deemed
mutually agreeable to the City and the property
owner, which will help to preserve historic
resources.

Consider the relaxation of current building and
zoning codes, as necessary, to preserve significant
structures, while ensuring that basic health and
safety goals are met.

Provide information to property owners who desire
such information on how to rehabilitate, research,
and appreciate their architecturally, historically,
and culturally significant property.

Inconsistent. The Project is to make alterations to
the SMC in a manner that is not consistent with the
Secretary of the Interior Standards for the
Treatment of Historic Properties (Standards). The
Standards are designed to assist property owners
with the rehabilitation of historic properties in a
manner that will retain their historical value yet
allow the structure to be brought into current
safety and other code compliance.

The Land Use Chapter, Section Three ‐ Preservation also identifies the following City process with respect to historic properties in the City:

The City has an intensive design review process and has adopted residential design guidelines.

These include detailed text and illustrations intended to ensure the compatibility of overall architecture as well as architectural detailing with existing development.   Currently, a design review committee appointed by the Council reviews development plans to ensure compatibility with the existing historic fabric of San Marino neighborhoods. Alterations to property visible from public view as well as all new construction are scrutinized.

Compliance with City Ordinances/Codes
The City’s historic preservation review processis outlined in the Chapter XXIII, Article 18 of the San Marino City Code. The process is designed to work with property owners of historic properties to encourage the retention of the character of the structure while bringing the structure up to current codes and in accordance with the Secretary’s Standards. Specifically, Ordinance Chapter XXIII, Article 18 states it is designed to “promote the public health, safety, and general welfare by providing for the identification, designation, protection, enhancement, and ongoing use of historical resources that represent the City’s cultural, architectural, social, economic, and political heritage.” As discussed in DEIR Section 5.1.2, the SMC is considered a City Landmark. As such, Chapter XXIII, Article 18, Section 23.18.07 of the San Marino City Code also identifies that any alteration, restoration, rehabilitation, construction, removal, relocation, or demolition of any historic landmark must receive a Certificate of Appropriateness approval from the City.

Page 162 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 56
Analysis Summary
Therefore, while the City did conduct extensive outreach and the Project does generally align with the City’s Vision Statement, the Project does not align with the General Plan Land Use Chapter Section Three ‐ Preservation which seeks to preserve the historical structures in San Marino.

Additionally, the Project is not consistent with findings that need to be made pursuant to Chapter XXIII, Article 18, Section 23.18.07 San Marino City Code to issue a Certificate of Appropriateness when renovating historic buildings.

5.2.6 Mitigation Measures
Because the conflict with the land use plan, policy, or regulation is related to modification of a historical resource, the Mitigation Measure CUL‐2, CUL‐3 and CUL‐4 identified in DEIR Section 5.1.6 would also apply to mitigation for the General Plan goal of historic resource protection. And while these measures will reduce impacts, these mitigation measures do not fully mitigate impacts because the requirements to obtain a Certificate of Appropriateness to alter the historic resource building could not be met.

5.2.7 Level of Significance After Mitigation
With the implementation of the mitigation measures CUL‐2, CUL‐3 and CUL‐4, the impact to land use policies relative to preservation of historic resources would not be reduced to a less than significant level.

Therefore, the Proposed Project, as currently designed, will cause a significant environmental impact due to a conflict with the City’s General Plan adopted for the purpose of avoiding or mitigating an environmental effect..

The level of significance of the impact to Land Use and Planning  ‐ Conflict With Policies is Potentially Significant after mitigation is incorporated.

Statement of Overriding Considerations
The City has the discretion to balance the benefits of a project against its unavoidable significant environmental impacts in considering whether to approve a project under CEQA. The City may approve a project with significant impacts if they adopt a Statement of Overriding Considerations finding that the project's benefits outweigh the unmitigated impacts. Project benefits may include economic, legal, social, and other considerations. Based on the identification of significant impacts to land use policies, the City would need to adopt a Statement of Overriding Considerations in order to approve the Proposed Project.

5.2.8 Cumulative Impacts
The Proposed Project impacts are limited to preservation of a single historic resource. No changes to the City’s current historic preservation policies and codes are proposed. The impacts are limited to one historic resource, owned by the City. Therefore, potential cumulative impacts of conflictsto land use plans and policies are less than significant, and no mitigation is required.

Page 163 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 57

5.3 PUBLIC SERVICES: SCHOOL FACILITIES

5.3.1 Introduction
The 2022 Initial Study prepared for the Proposed Project (Appendix F) concluded that the Proposed Project would result in less than significant impacts on fire services, police services, parks, or other public facilities. The Proposed Project will not increase population growth. Therefore, there is no need for additional schools, library or other public services. Therefore, impacts to these public services will not be further discussed here in the DEIR.

The 2022 Initial Study identified that impacts related to schools could be potentially significant, but feasible mitigation measures were identified to reduce impacts to less than significant. During the NOP comment and scoping period, some commenters requested more detail as to the Proposed Project’s potential impact to schools, including the Huntington Middle School’s operation of the Barth Athletics Complex (BAC) which was completed in late 2019/early 2020, at the same time asthe COVID‐19 pandemic forced the closure of public schools. The BAC is a new two‐story athletic complex that includes a full‐sized California Interscholastic Federation (CIF) Regulation gymnasium for the campus, two Media Classrooms, Fitness Room, Boy’s and Girl’s Team Rooms, and a second‐floor multi‐purpose room. The BAC was constructed in the same location as the former gym and track and field and was designed to replace outdated and undersized school athletic facilities.

Therefore, this section is designed to provide additional analysis for only schools, as requested during the NOP process.

5.3.2 Regulatory Setting
There are no regulations that are specific to schools that are co‐located with City or other public facilities.

In August 2018, the SMUSD prepared an Update to the 2013 Assessment of School Safety and Security Measures for each of its campuses (gkk Works, August 13, 2018), which includes the Huntington Middle School adjacent to the SMC. The report was originally prepared in 2013 by the SMUSD in response to continuing concerns regarding safety and security at the San Marino schools. The 2018 revision represented a follow up and update to the report prepared in 2013 in the aftermath of the Sandy Hook Elementary School shooting in Newtown Connecticut, in December 2012.

The report primarily identified a number of safety and security items for the Huntington Middle School. It also reviewed the traffic circulation for entry and exit points and general internal circulation of the parking lot.

5.3.3 Environmental Setting
Parking for the SMC is provided in 48 spaces located on the south side of the building, within the parking lot of Huntington Middle School, through a cooperative agreement with the SMUSD for use of the 48 spaces for both the SMC and as overflow parking for the Crowell Public Library. The shared parking arrangement with the SMUSD appears to be a traditional feature of the SMC and the Library, as historical articles in the Los Angeles Times indicate that the San Marino Women’s Club used the “school parking

Page 164 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 58
area” for club parking and for community events. A formal shared parking agreement between the City and the SMUSD was initiated in 2006 after the City purchased the building, and the agreement was renewed in 2019 for a 10‐year term (refer to Appendix A in the 2022 Initial Study, located in Appendix F of this DEIR).

5.3.4 Thresholds of Significance
Potential impacts to Public Services were fully evaluated in Section 4.15 of the 2022 Initial Study in accordance with the Section XV of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. As discussed in Section 4.15, there were no or less than significant impacts for police, fire and library services and facilities, and no further discussion is warranted. The threshold addressed in this DEIR is for Schools, as follows:

XV.a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection, Police protection, Schools, Recreation/Parks, Other public facilities?

5.3.5 Impact Analysis
Because the SMC and the Huntington School share a parking lot, with the SMC having designated spaces, a parking study for the Proposed Project was conducted to ensure the Project would not impact the school’s ability to service its programs to the extent that the school would need to construct another parking lot for its use. The parking study was conducted as part of the Project’s Transportation Impact Study, (herein referred to as “TIS”) for the 2022 Initial Study (refer to Appendix E of the 2022 Initial Study, located in Appendix F of this DEIR), and updated in February 2022 in response to requests received during the NOP process for additional analysis (Appendix D ‐ Traffic Impact Study ‐ San Marino Improvement Project, February 23, 2022).

The parking study in the TIS evaluated the school’s typical calendar, pick‐up and drop‐off times, as well as evaluated the potential SMC event calendar as identified in Table 3‐1 of this DEIR. The school calendar information obtained from the SMUSD staff was for the school years 2018‐2019, 2019‐2020, and through Spring 2021 and included an estimate of the number of potential attendees for each of the events identified on the calendar. Interviews with District staff identified that the BAC was designed to replace outdated, undersized gym facilities and was not designed to increase the number of services or athletic teams or events (Personal Communication, June 2021). The BAC is open to community user groups for non‐school sponsored activities, just as the former gym and facilities were open to community groups for non‐school sponsored activities. However, because the BAC was not fully operational prior to the COVID‐ 19 pandemic schoolshutdown, there was no data available asto if the BAC would be utilized for additional school events, and therefore, generate the need for additional parking for the school events.

Project Parking Needs Determination
The parking study in the TIS modeled parking ratios based on the Institute of Transportation Engineers’ (ITE) Parking Generation Manual publication. The Parking Generation Manual presents the state‐of‐the‐

Page 165 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 59
practice understanding of the relationship between parking demand and various characteristics associated with individual land use developments, based on parking studies conducted at locations throughout North America. While the Parking Generation Manual does not contain a parking ratio specifically for a community center, the two land uses most applicable are those for a government office building and a recreational community center.

The parking study applied the two ITE published parking demand ratios to the proposed SMC Improvement Projectto evaluate the number ofspacesrequired for a community center. As a government office building, the average weekday peak parking demand of 32 spaces was identified; as a recreational community center, the average weekday peak parking demand was 22 spaces.

A calculation of the San Marino City Code parking requirement was also prepared in accordance with the City of San Marino Municipal Code off‐street parking requirements (Section 23.10.03, Number of Parking Spaces Required). In accordance with the Municipal Code parking regulations, the following parking requirement was determined to be most applicable to the proposed project as follows:
 Office buildings. For all buildings on Huntington Drive (including commercial areas on Chelsea Road, Granada Avenue, San Gabriel Boulevard and San Marino Avenue) existing on October 25, 2010: 1 space for every 350 square feet of gross floor area.

Through strict application of the Municipal Code parking regulations, the total gross floor area of the SMC is 10,832 square feet, therefore:
 Community Center: 10,832 SF x 1.0 space/350 SF = rounded to 31 spaces. Total Code Required Project Parking = 31 spaces
In summary, the San Marino City Code parking requirement for the proposed SMC Improvement Project (i.e., 31 spaces) is less than the parking demand forecast utilizing the ITE parking demand ratios for a government office building (i.e., 32 spaces) but more than that forecast for a recreational community center (i.e., 22 spaces).

The parking analysis in the TIS identified that the 48 spaces as identified in the SMUSD/City agreement was generally sufficient to accommodate the Proposed Project’s historic and future use and would generally not interfere with the school’s ability to supply parking for its ongoing activities (DEIR, Appendix D).

The parking analysis in the TIS also evaluated the parking demand for all 209 spaces in the parking lot that is shared between the SMC, library and school (DEIR, Appendix D). The analysis concluded that the shared parking demand would create a surplus of 9 to 11 parking spaces during peak weekday and weekend conditions, respectively, assuming that the 17 on‐street spaces along Huntington Drive and West Drive along the library frontages are also available for shared use. Therefore, the Project would not create an additional demand for parking under anticipated general operations.

However, the TIS (DEIR, Appendix D) identified that while the number ofspacesis adequate under general conditions, the allocation of 48 spaces for SMC may not be sufficient if the SMC, Crowell Public Library and the Huntington Middle School held large‐scale events at the same time (such as a wedding or conference at the SMC at the same time as a major athletic event at the school). As such, mitigation

Page 166 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 60
measures were identified in the Initial Study to ensure coordination between the City and the Huntington Middle School to reduce the potential for a significant demand for concurrent parking during highly attended concurrent events, which may interfere with the school’s ability to provide services and programs, thereby necessitating the school to consider constructing additional facilities, such as another parking lot.

5.3.6 Mitigation Measures
The existing parking allocation of 48 spaces for the SMC appears to be consistent with what is required by the City Code and ITE. The TIS also determined that the existing allocation of parking spaces within the Huntington Middle School parking lot was adequate to serve the Proposed Project. Therefore, no mitigation applies to Proposed Project for its envisioned existing and proposed use.

There is no change from the 2022 Initial Study asto the need to implement mitigation measuresto address the potential for a parking demand deficit for potential future highly‐attended concurrent events between the City (SMC and Library) and the Huntington School. For this DEIR, the measures from the 2022 Initial Study have been refined based on comments received during the NOP comment and scoping period.

Underlined text (underlined) represents text deletions and strikeout text (strikeout) represents text additions. The measures are as follows:

PS‐1   Shared Event Calendar. The City and shall work with the Huntington Middle Schoolshould to maintain an joint events calendar that is accessible and shared between the City (for library and SMC events) and the Huntington Middle School which would include the date, time and duration of the event, including the expected attendance figure for each event.

Special SMC events/meetings where 40 attendees or more are expected would require further coordination with the Huntington Middle School and Crowell Public Library to ensure that any overlap of activities is minimized to the extent possible. To the extent feasible, the City and the Library shall avoid scheduling classes/meetings/events held at the SMC and the Crowell Public Library that begin or end such that it overlaps with the morning drop‐off and afternoon pick‐up peak time periods at the Huntington Middle School.

PS‐2 Managed Parking Collaboration. Prior to the completion of Project construction, The the City shall initiate collaborative discussions with and the Huntington Middle School should collaborate to implement to develop a managed parking plan to be implemented whenever concurrent events are anticipated to exceed the total number of parking spaces available within the school parking lot. Managed parking strategies to be implemented in such circumstances include but are not limited to valet parking, tandem parking, and dedicated ride share areas and special event parking permit requirements. for some spaces within the on‐site parking facility (i.e., both valet parking spaces and tandem parking spaces) which would increase the effective parking supply as valet‐attended parking could occur within drive aisles located throughout the on‐site parking areas or other nearby lots (i.e., District Office parking lot).

PS‐3 Additional Parking Study for Huntington Drive. The City will shall study the installation of additional parking spaces along the south side of Huntington Drive along the SMC

Page 167 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 61
frontage, similar to the spaces that are currently in front of the Crowell Public Library, and implement as feasible.

PS‐4 Encourage Alternative Transportation. The City shall encourage users and employees of the SMC and Crowell Public Library and Huntington Middle School should encourage all of its users and employeesto utilize alternative modes of transportation including but not limited to: bicycle, transit, ride‐share, and other ride service opportunities to events where appropriate. Implementation of this method includes but is not limited to public awareness in the form of a statement on the City’s website, a statement on recreational class schedules, and a statement in contracts for private events.

PS‐5 Conduct Future Parking Study. The City will shall conduct a parking utilization monitoring study one year from issuance of the Project’s Certificate of Occupancy. The parking utilization monitoring study must demonstrate that assess whether on‐site parking is adequate to meet Project demand during both weekday and weekend conditions, as well as the effectiveness of measures PS‐1 and PS‐2. If the study shows that Project parking demand exceeds the supply of parking within the Project, the study shall identify additional available parking reduction strategies, and the City shall select and implement City shall propose measures to reduce or otherwise address parking demand, spillover parking impacts, subject to review and approval by the Director of Public Works Community Development. The additional parking reduction strategies may include, but are not limited to: 1) preparation of a Valet Parking Plan, 2) provision of shuttles from off‐ site locationsfor high‐attendance events; 32) provision of transit passes and/orride‐share subsidies for employees, and/or 43) subsidized off‐site parking options in order to minimize on‐site employee parking demand, if necessary.

5.3.7 Level of Significance After Mitigation
No mitigation is required to reduce impacts of the Proposed Project for its general proposed use as a community center for recreation classes, staff offices and community meetings, therefore, the impact is less than significant.

With implementation of Mitigation Measures PS‐1 through PS‐5, the Proposed Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered school facilities, need for new or physically altered school facilities, such as an additional parking lot, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives. Therefore, as identified in the 2022 Initial Study and this DEIR, potential impacts associated with schools would be less than significant with the incorporated mitigation, and no further mitigation is required.

5.3.8 Cumulative Impacts
The SMC is the only community center in the City that is adjacent to a school. Therefore, there are no other projects that are similar in nature that apply to a cumulative impacts analysis. The TIS prepared for the project addressed potential cumulative impacts of event parking in the shared parking lot of the school, which resulted in the mitigation measures. There are no other cumulative impacts associated with the Proposed Project.

Page 168 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 62

5.4 TRANSPORTATION

5.4.1 Introduction
The 2022 Initial Study prepared for the Proposed Project (Appendix F) concluded that the Proposed Project would result in less than significant impacts on transportation. The TIS was initially prepared for the Proposed Project in September 2021 as part of the Initial Study (Appendix F). The 2022 Initial Study analysis prepared for the Proposed Project concluded that the Project impacts were less than significant, and no mitigation measures were identified.

During the NOP scoping meeting, one commenter requested that the DEIR re‐evaluate traffic impacts and consider the SMUSD’s Traffic Study prepared in 2018 which addressed the Huntington Middle School (Appendix E  ‐ Traffic Circulation Review of Huntington Middle School, July 31, 2018). The City of San Marino Public Safety Commission, along with the City Traffic Engineer, the City Director of Public Works and City Chiefs of Police and Fire also reviewed the report in 2018. As such, in preparation of this DEIR, the TIS was revised in February 2022 to consider the SMUSD’s traffic study (DEIR, Appendix D). Therefore, this section is designed to provide the results of the additional analysis as requested during the NOP scoping meeting.

5.4.2 Regulatory Setting
Senate Bill 743
Senate Bill 743, adopted in 2013, added section 21099 to the Public Resources Code, which states that automobile delay, as described by level of service (LOS) or similar measures of vehicular capacity or traffic congestion, shall not be considered a significant impact on the environment. The law also directed the Office of Planning and Research (OPR) to amend the CEQA Guidelines to establish new metrics for determining the significance of transportation impacts of projects. The California Natural Resources Agency certified and adopted the amended CEQA Guidelines in December 2018. In the amended CEQA Guidelines, OPR selected vehicle miles traveled (VMT) as the preferred transportation impact metric and applied its discretion to require use of VMT statewide, beginning in July 2020.  Accordingly, jurisdictions must now use the VMT methodology as the metric for evaluating the environmental impacts on transportation under CEQA instead of the traditional level of service (LOS) methodology. Essentially a project’s environmental impacts can no longerfocus on vehicle delay atstreet intersections or on roadway segments but must use the miles a vehicle must travel between a dwelling and commerce, recreation and/or work. The intent of this shift in methodology is to encourage different land use and transportation decisions to reduce greenhouse gas emission, support in‐fill development and improve public health through active transportation.

Regional Transportation Plan
The Southern California Association of Governments (SCAG) is a council of governments representing the six‐county region of Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura counties. The Regional Transportation Plan (RTP) for the six‐county region is the 2016‐2040 Regional Transportation Plan / Sustainable Communities Strategy (2016 RTP/SCS), adopted by SCAG on April 7, 2016. The SCS outlines a development pattern for the region, which, when integrated with the transportation network

Page 169 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 63
and other transportation measures and policies, would reduce greenhouse gas emissions from transportation (excluding goods movement).

City of San Marino
The City of San Marino’s Circulation Element (Meyer, Mohaddes Associates, Inc., August 1995) for its General Plan was established to provide for a safe, convenient and efficient transportation system for the City. To meet this objective, the Circulation Element was designed to accommodate the anticipated transportation needs based on the estimated intensities of various land uses within the region. The City’s Circulation Element and the Final General Plan (2003)setsforth actions and policies pertaining to accident and traffic safety, transit and public transportation, ensuring easy and convenient access to the regional facilities, bicycle routes and pedestrian facilities, among other things. Relevant adopted policies include:

Circulation Element:

Functional Classifications of Roadways
 Policy 5. Safe or acceptable levels of service on City streets shall be a criterion for evaluation of land use developments. The minimum acceptable level of service at intersections shall be level of service C. A new development project would be considered to have a significant negative impact if it added more than 200 vehicles per day to a Local street or caused the daily volume on the Local street to exceed 2,500 vehicles per day.
 Policy 11. Maintain and enhance the character of Huntington Drive as a Parkway and as the main commercial/civic center of San Marino, thereby strengthening support for these commercial areas, through landscaping and pedestrian amenities in keeping with the residential character of the community.

Neighborhood Traffic Control Plans
 Policy 13: Develop and implement neighborhood traffic control plans which will reduce the speed and volume of traffic on residential streets to acceptable levels.  Policy 17:  Improve safety at school drop‐off areas and employ appropriate traffic control measures in the vicinity of schools to maximize safety for school children walking or bicycling to/from school.

Public Transportation
 Policy 18:  The City shall work with public transit agencies to ensure that transit lines are routed on streets in accordance with the policies of [the] Circulation Element.  Policy 22.   The City shall continue to provide paratransit (Dial‐A‐Ride) services to residents, to the extent that resources allow.

Non‐Motorized Transportation
 Policy 23:  The City shall develop a bicycle plan which provides opportunitiesforsafe, recreational bike usage and provides continuity between land uses in San Marino.  Policy 24:  The City shall evaluate the sidewalk system throughout the City, in all neighborhoods, and where approval for sidewalk installation is provided by residents.  Policy 25: In areas of the City, where commercial or public facilities are located, the City shall implement measures to enhance the pedestrian and bicycle environment, to attempt to slow passing vehicular traffic,

Page 170 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 64
and to ensure handicapped accessibility in accordance with the requirements of the Americans with Disabilities Act.
 Policy 26: Install pedestrian‐activated signals, where appropriate, and crosswalks to provide safe, adequate pedestrian accessibility for shopping areas and residences.

Transportation Demand Management
 Policy 36: The City shall encourage itsresidents and employeesto utilize alternative modes of transportation such as buses, light rail transit, carpools, Dial‐A‐Ride vehicles, bicycles and walking and shall take measures to ensure that these alternate modes are available in the City.  Policy 37: The City shall encourage Transportation Demand Management programs as a mechanism to reduce parking demands in the City.

Vehicle Miles Traveled Evaluation Method
Per City Resolution No. R‐20‐18, the City’s project review process utilizes VMT asthe method to determine a project’simpact on the environment for CEQA purposes. The San Gabriel Valley Council of Governments (SGVCOG) produced a Vehicle Miles Traveled Evaluation Tool (“VMT Evaluation Tool”), which was developed by Fehr & Peers as part of the VMT Implementation Study effort. A number of the cities in the San Gabriel Valley, including the City of San Marino, utilize this tool for its VMT analysis to determine a project’s impact on the environment. VMT measures how much actual auto travel (additional miles driven) a proposed project would create on the roads.

Consistent with the requirements of CEQA Guidelines Section 15064.3, the City of San Marino adopted significance criteria for transportation impacts based on VMT when evaluating VMT to determine traffic‐ related impacts for land use development projects (Table 5‐3 ‐ City of San Marino VMT Thresholds).

Table 5‐3: City of San Marino VMT Thresholds
Project Type Thresholds
Land Use Plan
1) Project Impact: A significant impact would occur if the VMT rate for the plan would exceed the applicable baseline VMT rate.
2) Cumulative Project Effect: A significant impact would occur if the project increases total regional VMT compared to cumulative no project conditions.

Land Use Project
1) Project Impact: A significant impact would occur if the VMT rate for the project would exceed the applicable baseline VMT rate.
2) Cumulative Project Effect: A significant impact would occur if the project increases total regional VMT compared to cumulative no project conditions.

Retail Project (over 50,000
square feet)
1) Project Impact: A significant impact would occur if the VMT rate for the project would exceed the applicable baseline VMT.
2) Cumulative Project Effect: A significant impact would occur if the project increases total VMT in the study area compared to baseline conditions.

Transportation Project
A significant impact would occur if the project causes a net increase in total regional VMT compared to baseline conditions, opening year no project conditions, or cumulative no project conditions.

All land use and
transportation projects
A significant impact would occur if the project is inconsistent with the RTP/SCS (Regional Transportation Plan/Sustainable Communities Strategy).

Page 171 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 65
The State OPR also set forth guidance for agencies to use “screening thresholds” to quickly identify when a project should be expected to cause a less‐than‐significant impact without conducting a detailed study. (refer to CEQA Guidelines, §§ 15063(c)(3)(C), 15128, and Appendix G.). The types of projects that are exempt from preparing a detailed VMT analysis are based on project size, maps, transit availability, and provision of affordable housing. The City of San Marino adopted three screening criteria which may be applied to screen proposed projects out of detailed VMT analysis. These screening criteria include Transit Priority Area Screening, Low‐VMT Screening and Project Type Screening.

Level of Service Evaluation Method
Per City Resolution No. R‐20‐18, the City’s project review process utilizes VMT asthe method to determine a project’s impact on the environment for CEQA purposes and retains the LOS analysis to ensure consistency with the City’s General Plan. The LOS method is defined in the Highway Capacity Manual 6 and assigns a qualitative letter grade that represents the operations of the intersection, ranging from LOS A (minimal delay) to LOS F (excessive congestion). LOS E represents at‐capacity operations. Descriptions of the LOS letter grades for signalized and unsignalized intersections are provided in Table 5‐4: Level of Service Descriptors. The City of San Marino’s General Plan Policy No. 5, prepared in 1994, identifies a LOS “C” as generally acceptable. The 2021 Citywide Traffic Study (herein referred to as “Citywide Study,” Iteris, Inc., March 30, 2021) which was prepared to develop safety and/or traffic calming improvements within the City, identified that most intersections throughout the City operate at “generally acceptable conditions (LOS D or better).” The Citywide Study data reflects the population growth and regional transportation system changes that have occurred since the time the 1994 Circulation Element was adopted.

Table 5‐4:  Level of Service Descriptors
LOS Description
Intersection Control Delay
(seconds/vehicle)
Signalized
Intersections
Unsignalized
Intersections
A Operations with very low delay occurring with favorable progression and/or shortcycle length. ≤ 10 ≤ 10
B Operations with low delay occurring with good progression and/or short cyclelengths.
>10 and <
20 >10 and <
15 C Operations with average delays resulting from fair progression and/or longer cyclelengths. Individual cycle failures begin to appear. >20 and <
35 >15 and <
25 D
Operations with longer delays due to a combination of unfavorable progression,long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable.
>35 and <
55 >25 and <
35 E
Operations with high delay values indicating poor progression, long cycle lengths,and high V/C ratios. Individual cycle failures are frequent occurrences.
>55 and <
80 >35 and <
50 F
Operation with delays unacceptable to most drivers occurring due to oversaturation, poor progression, or very long cycle lengths.
> 80 > 50
Source: Iteris, Inc., March 30, 2021.

Page 172 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 66

5.4.3 Environmental Setting
The Project site is located at 1800 Huntington Drive, along the south side of Huntington Drive, approximately 400 feet west of the intersection with West Drive. Huntington Drive, oriented in a northeast‐southwest direction, is a six‐lane divided roadway, representing the major east‐west corridor through the City.

Operations and Planning Studies
Consistent with the City’s commitment to ensure safety on its roadways, the City commissioned several operational planning studies:
 Huntington Drive Safe Streets Corridor Plan (Plan). Produced in 2018 through a Caltrans grant in conjunction with SCAG, the Plan focused on 2.5 miles of Huntington Drive in the City of San Marino to identify policies, projects, and/or programs that will help ensure the corridor functions safely and effectively now and in the future. The Plan included:
 Provided possible designs, recommendations, and development standards for improved road safety and operations, pedestrian, bicycle and/or transit facilities, and enhanced safety features and streetscapes;
 Provided prioritized recommendations for implementation and potential funding sources; and
 Provided potential implementation of recommendations resulting in improved conditions for accessing schools, businesses, and residences located along the Huntington Drive corridor.
 Citywide Traffic Circulation Study. Prepared in March 2021 by the traffic consultant Iteris, the purpose this study was to utilize current traffic data and community feedback to develop implementable safety and/or traffic calming improvements within the city. The report provides a summary of existing transportation conditions within the City, a discussion of previous planning efforts, recommendations for circulation improvements, and a toolbox for traffic calming measures. The report includes key information regarding traffic volumes, roadway and traffic signal characteristics, a review of other relevant plans/studies, historical collision data, and analysis of current traffic operations during peak conditions. The traffic volumes were collected for this study in 2019 and 2020 and reflect the roadway conditions prior to the COVID‐19 pandemic.

Public Transit
Public bus transit services are provided within the Project area by the Los Angeles County Metropolitan Transportation Authority (Metro) lines and the City of Montebello Bus Lines (MBL). Public transit access to the Project site is accommodated by Metro which runs one line along Huntington Drive at a frequency of approximately 60 minutes during weekday and Saturday peak service. The nearest bus stops for Metro Line 79 provide amenities including benches and trash receptacles east of the project site (i.e., along the north side of Huntington Drive west of West Drive and along the south side of Huntington Drive east of West Drive). Other bus stops for Metro bus lines with benches and trash receptacles are provided west of the project site (i.e., within approximately one‐quarter of a mile of the project site) at the following

Page 173 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 67
locations: 1) along the north side of Huntington Drive west of Virginia Road, and 2) along the south side of Huntington Drive east of Virginia Road.

Bicycle Facilities
Bicycle infrastructure consists of both facilities within the roadway as well as public bicycle parking spaces.

The Federal and State transportation systems recognize three primary bikeway facilities: Bicycle Paths (Class I), Bicycle Lanes (Class II), and Bicycle Routes (Class III). Bicycle Paths (Class I) are exclusive car free facilities that are typically not located within a roadway area. Bicycle Lanes (Class II) are part of the street design that is dedicated only for bicycles and identified by a striped lane separating vehicle lanes from bicycle lanes. Bicycle Routes (Class III) are preferably located on collector and lower volume arterial streets.

As indicated in the Huntington Drive Safe Streets Corridor Plan, the only existing bicycle facility within the City of San Marino is a north‐south Class II bike lane on Del Mar Avenue from Huntington Drive to the southerly City limits (0.70 miles). The 2014 Draft San Marino Bicycle and Pedestrian Plan included proposed protected bicycle lanes along Huntington Drive. Adjoining jurisdictions have plans for Class II bicycle lanes along Huntington Drive east and west of the City of San Marino (i.e., Los Angeles County Bicycle Master Plan proposes ClassII bicycle lanes on Huntington Drive in unincorporated East San Gabriel to the east of the project site and the South Pasadena Bicycle Master Plan also proposes Class II bicycle lanes to the west of the site).

Pedestrian Facilities
Pedestrian infrastructure consists of facilities such as sidewalks, crosswalks, pedestrian signals, curb access ramps, Americans with Disabilities Act (ADA) compliant tactile warning strips, and curb extensions, among other things. These facilities are widely provided within the study area. Sidewalks are currently provided along Huntington Drive and along other corridors near the site, including Virginia Road and West Drive. Marked crosswalks, pedestrian signals, and curb ramps are provided at the study intersections.

Roadway Classification and Circulation
Huntington Drive is designated as a “Parkway” in the City of San Marino’s Circulation Element (Meyer, Mohaddes Associates, Inc., August 1995), and is the City’s main east‐west roadway carrying an estimated 30,000 vehicles per day. Per the Circulation Element, a Parkway is intended to function as a major thoroughfare for the movement of traffic within the City and between the City and neighboring communities, generally designed to accommodate 20,000 to 50,000 vehicles per day. Parkways are the appropriate locations for commercial activities, higher density land uses, and transit routes.

The travel lanes along Huntington Drive are separated by a 60‐ to 65‐foot median parkway, and the posted speed limit is 40 miles per hour. Huntington Drive in the Project vicinity directly serves mostly commercial and institutional uses, though there are some residences with frontage (driveway access) on the roadway.

Page 174 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 68

5.4.4 Thresholds of Significance
Potential impacts to Transportation were fully evaluated in Section 4.17 of the 2022 Initial Study in accordance with the Section XVII of the CEQA Guidelines, Appendix G ‐ Environmental Checklist Form. The analysis of all thresholds identified that the Project would have less than significant impacts, and no mitigation was required.

However, comments received during the NOP comment and scoping period requested that the DEIR further analyze traffic concerns. Based on the comments, the concerns relate to the following two thresholds of significance, which are the only thresholds relative for further analysis in this DEIR:

XVII.a)   Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
XVII.b)  Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)?

5.4.5 Impact Analysis
Criterion XVII.a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? The guiding program, plan, ordinance or policy for this Project is the City’s Circulation Element within the City’s General Plan. The purpose of the Project is to enhance the SMC building to allow it to be more usable and accessible to City residents and to provide an office for the City recreation staff. The SMC is currently utilized as a community recreation center and meeting center, and the Chamber of Commerce rents a portion of the SMC for its office. The consistency with the Circulation Element is identified as follows:

Functional Classification of Roadways
Policy 5: Safe or acceptable levels of service on City streets shall be a criterion for evaluation of land use developments. The minimum acceptable level of service at intersections shall be level of service C. A new development project would be considered to have a significant negative impact if it added more than 200 vehicles per day to a Local street or caused the daily volume on the Local street to exceed 2,500 vehicles per day.

For the purpose of ensuring the Project is consistent with the City’s Circulation Element Policy 5, the TIS prepared for the Project utilized the LOS method. The TIS was prepared in September 2021 for the 2022 Initial Study (refer to Appendix E of the 2022 Initial Study, which is contained in Appendix F of this DEIR) and revised in February 2022 (DIER, Appendix D) to address additional analysis as requested during the NOP comment and scoping process.

The TIS determined that the Project is expected to generate 18 new vehicle trips (12 inbound trips and 6 outbound trips) or 21 person trips/1.135 persons per vehicle during the weekday AM peak hour. During the weekday PM peak hour, the proposed Project is expected to generate 16 new vehicle trips (5 inbound trips and 11 outbound trips) or 19 person trips/1.135 persons per vehicle.

Page 175 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 69
The intersections closest to the SMC that were studied in the Citywide Study included West Drive/Huntington Drive (immediately east of the Project site) and Virginia Road/Huntington Drive (approximately 0.25 mile west of the Project Site). The Citywide Study found that although the Circulation Element’s acceptable LOS is C, the Cambridge Road‐West Drive/Huntington Drive intersection currently operates at a LOS “D” in both peak AM and peak PM hours, and the intersection of Virginia Road/Huntington Drive currently operates at a LOS “D” in the AM and “C” in the PM peak hours. The Citywide Study also identified that for Huntington Drive, the westbound lanes carried the AM peak hour traffic and the eastbound lanes carried the PM peak hour traffic.

During the NOP comment and scoping period, concerns were raised that the Citywide Traffic Study’s data utilized for the Project’s TIS did not account for traffic experienced during the Huntington Middle School pick‐up and drop‐off times, and therefore, the Project traffic should be re‐evaluated. Transportation studies and operational reviews are focused on the time period where the surrounding street system is most heavily constrained which is commonly during the weekday commuter AM and PM peak hours.

To ensure that the Project’s traffic assessment accounted for potential cumulative impacts of the Project and the pick‐up and drop‐off times at the school, the Project TIS was revised in February 2022 (Appendix D) to compare the school schedule and data collection methods in the Citywide Study. The Huntington Middle School has an average enrollment of 650 students, grades 6 through 8, and does not have general student bussing services. According to the Huntington Middle School Bell schedule and interviews with Huntington Middle School staff, all students must be in class by 8 am. Therefore, students are typically dropped off by passenger vehicles between approximately 7:15 am and 8 am. School ends at 2:50 pm, therefore, passenger vehicles are generally lined up in the parking lot beginning at 2:30 pm, with student pickup generally completed by 3:30 pm. Athletic events at the BAC typically begin when school ends, or from approximately 3:30 pm to approximately 5 pm. The primary school entrances are from Huntington Drive, one from Sherwood Drive, and one from West Drive.

Table 5‐5 Project Intersection Study Times identifies that the peak hour traffic data collected for the Citywide Study would have included the Huntington Middle School traffic in the morning and during after‐ school programs/events. Therefore, the data utilized in the Project TIS would have also captured the Huntington Middle School traffic. Therefore, no further analysis is required.

Table 5‐5: Project Intersection Study Times
AM PM
Time 6:00 7:00 8:00 9:00 10:00 11:00 12:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 Citywide Study
Student
Pickup/Drop off
After School
Activities
Therefore, based on the Project TIS, the Proposed Project would not reduce the LOS below the existing operational LOS as identified by the Citywide Study or reduce the LOS as established by Circulation Element Policy 5 primarily because of the low volume of traffic anticipated to be generated by the Proposed Project.  Table 5‐6: Summary of Delays and Levels of Service Weekday AM and PM Peak Hours

Page 176 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 70
summarizes the findings of the TIS. Therefore, the Project is consistent with the standards set forth in Policy 5 of the Circulation Element.

Table 5‐6: Summary of Delays and Levels of Service Weekday AM and PM Peak Hours NO. INTERSECTION

TRAFFIC

CONTROL
PEAK
HOUR
[1] [2] [3] [4]
YEAR 2021

EXISTING
DELAY   LOS
[a] [b]
YEAR 2021

EXISTING W/

PROJECT

DELAY LOS
[a] [b]
CHANGE

INDELAY
IMPACT
[(2)‐(1)] [c]
YEAR 2023
FUTURE
PRE‐PROJECT

DELAY LOS
[a] [b]
YEAR 2023

FUTURE W/

PROJECT

DELAY LOS
[a] [b]

CHANGEIN
DELAY
IMPACT
[(4)‐(3)] [c]
1 Virginia Rd/ Signalized AM 26.9 C 27.0 C 0.1 No 27.5 C 27.6 C 0.1 No Huntington Dr PM 20.8 C 20.9 C 0.1 No 21.3 C 21.4 C 0.1 No 2 Virginia Rd/ All‐Way AM 10.7 B 10.7 B 0.0 No 10.9 B 10.9 B 0.0 No Roanoke Rd Stop PM 10.3 B 10.3 B 0.0 No 10.5 B 10.5 B 0.0 No 3 Cambridge Rd‐
West Dr/
Huntington Dr
Signalized AM
PM

41.7 D

44.2 D

43.7 D

47.7 D

2.0 No

3.5 No

42.5 D

45.7 D

44.8 D

48.7 D

2.3 No

3.0 No
4 Sierra Madre Blvd‐
San Marino Ave/
Huntington Dr
Signalized AM
PM
176.4 F
152.7 F
177.0 F
154.0 F

0.6 No

1.3 No
184.3 F
162.5 F
185.1 F
164.4 F

0.8 No

1.9 No
Policy 11. Maintain and enhance the character of Huntington Drive as a Parkway and as the main commercial/civic center of San Marino, thereby strengthening support forthese commercial areas, through landscaping and pedestrian amenities in keeping with the residential character of the community.

The Project proposes no changes to Huntington Drive as a Parkway. Therefore, the Project is consistent with Circulation Element Policy 11.

Neighborhood Traffic Control Plans
Policy 13: Develop and implement neighborhood traffic control plans which will reduce the speed and volume of traffic on residential streets to acceptable levels.

Policy 17:  Improve safety at school drop‐off areas and employ appropriate traffic control measures in the vicinity of schools to maximize safety for school children walking or bicycling to/from school.

The City prepared the Huntington Drive Safe Streets Corridor Plan and the Citywide Traffic Circulation Study for the purpose of developing projects and policies to increase road, pedestrian and bicycle safety throughout the City. The Proposed Project is to improve a City community center and will not impact the City’s ability to implement projects or plans suggested in those studies.

A comment received during the NOP process requested that the City evaluate if the Project would impact the Huntington Middle School pick‐up and drop‐off circulation as referenced in a traffic memorandum contained in the SMUSD’s Update to the 2013 Assessment of School Safety and Security Measuresfor each of its campuses (gkk Works, August 13, 2018, herein referred to as “SMUSD Assessment”) including the Huntington Middle School (Appendix E ‐ Traffic Circulation Review of Huntington Middle School, July 31, 2018). The SMUSD’s Assessment of traffic conditions at the school (Appendix E) identified that the Huntington Middle School vehicular circulation at drop off and pick‐up areas are adequately designed and controlled by surveillance, proper signage and lighting, and generally circulated well. The SMUSD’s Assessment was also reviewed by the San Marino Fire Department in 2018 and identified that it could

Page 177 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 71
access the site with no known impediments. The traffic memorandum also identified improvements to Huntington Drive that could facilitate the school’s pick‐up and drop‐off flow.

The Proposed Project occurs off Huntington Drive and is anticipated to generate minimal traffic. The Proposed Project would not prohibit or affect any plans for the City or the SMUSD to improve Huntington Drive to reduce the speed and volume of traffic on residential streets to acceptable levels, improve safety at school drop‐off areas, or employ traffic control measures in the vicinity of schools to maximize safety for school children walking or bicycling to/from school. Therefore, the Project is consistent with Circulation Element Policies 13 and 17.

Public Transportation
Policy 18:  The City shall work with public transit agencies to ensure that transit lines are routed on streets in accordance with the policies of [the] Circulation Element.

Policy 22.   The City shall continue to provide paratransit (Dial‐A‐Ride) services to residents, to the extent that resources allow.

The Proposed Project occurs off Huntington Drive and does not impact the ability for the public transit agencies to provide service along Huntington Drive or impact Dial‐A‐Ride services. Bus stops are conveniently located within walking distance of the SMC for residents to utilize the community center.

Therefore, the Proposed Project is consistent with Circulation Element Policies 18 and 22.

Non‐Motorized Transportation
Policy 23:  The City shall develop a bicycle plan which provides opportunities for safe, recreational bike usage and provides continuity between land uses in San Marino.

Policy 24:  The City shall evaluate the sidewalk system throughout the City, in all neighborhoods, and where approval for sidewalk installation is provided by residents.

Policy 25: In areas of the City, where commercial or public facilities are located, the City shall implement measures to enhance the pedestrian and bicycle environment, to attempt to slow passing vehicular traffic, and to ensure handicapped accessibility in accordance with the requirements of the Americans with Disabilities Act.

Policy 26: Install pedestrian‐activated signals, where appropriate, and crosswalks to provide safe, adequate pedestrian accessibility for shopping areas and residences.

The City prepared the Huntington Drive Safe Streets Corridor Plan and the Citywide Traffic Circulation Study for the purpose of developing projects and policies to increase road, pedestrian and bicycle safety throughout the City. The Proposed Project is to improve a City community center and will not impact the City’s ability to implement projects or plans suggested in those studies.

The Proposed Project will remove the existing secondary driveway to the SMC that islocated between the SMC and the Crowell Public Library and replace it with a sidewalk, thereby adding to the pedestrian facility in the Project area. The Project will notrequire the installation of additional pedestrian signals, crosswalks, or other facilities. Therefore, the Proposed Project is consistent with Circulation Element Policies 23, 24, 25, and 26.

Page 178 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 72
Transportation Demand Management
Policy 36: The City shall encourage its residents and employees to utilize alternative modes of transportation such as buses, light rail transit, carpools, Dial‐A‐Ride vehicles, bicycles and walking and shall take measures to ensure that these alternate modes are available in the City.

Policy 37: The City shall encourage Transportation Demand Management programs as a mechanism to reduce parking demands in the City.

The City has been utilizing the SMC as a community center since 2005. The City already encourages its residents to utilize alternative modes of transportation throughout the City. The Proposed Project will not conflict with the City’s ability to continue to promote alternative modes of transportation. Additionally, the Proposed Project specifically would encourage the use of alternative modes of transportation as well as managed parking collaboration as part of Mitigation Measures PS‐2 and PS‐4, which were identified to reduce potential impacts to the Huntington Middle School parking lot whenever concurrent events between the SMC, the Huntington Middle School and the Crowell Public Library are anticipated to exceed the total number of parking spaces available within the school parking lot which they share. Therefore, the Proposed Project is consistent with Circulation Element Policies 36 and 37.

Therefore, overall, the Proposed Project does not conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.

Criterion XVII.b)  Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? Section 15064.3, subdivision (b)(1) of the CEQA Guidelines requires a determination as to if the project will result in a substantial increase in vehicle miles traveled (VMT) Traditionally, public agencies have set certain thresholds to determine whether a project requires detailed VMT analysis or if aspects of the project could be assumed to have less than significant environmental impacts without a detailed VMT study. The City of San Marino adopted three screening criteria which may be applied to determine if a proposed project required a detailed VMT analysis or if the project could be assumed to have a less than significant impact without a detailed analysis. Proposed projects are not required to satisfy all of the screening criteria in order to screen out of further VMT analysis; satisfaction of one criterion is sufficient for screening purposes. The Project TIS (DEIR, Appendix D) evaluated the Project against the City’s screening criteria as follows:
 Transit Priority Area Screening ‐ CEQA Guidelines Section 15064.3(b)(1)statesin part: “Generally, projects within one‐half mile of either an existing major transit stop or a stop along an existing high‐quality transit corridor should be presumed to cause a less than significant transportation impact.” In keeping with the statutory presumption of less than significant impacts due to nearby high‐quality transit, the City of San Marino has adopted a transit priority area (TPA) screening criterion. Projects which are located within a TPA are presumed to have a less than significant impact, absent substantial evidence to the contrary.

Findings: The Los Angeles County Metropolitan Transportation Authority (Metro) Transit line and the Montebello bus line which provide services in the immediate vicinity of the Project site, do not meet the criteria for a high‐quality transit corridor or TPA. Based on a review of the existing

Page 179 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 73
transit service in the vicinity, this screening criteria is not met for the Proposed Project due to the Project being located within a TPA.
 Low VMT Area Screening ‐ It is assumed that projects which will be located within areas which currently exhibit low VMT, and that incorporate similar features pertaining to density, land use mix, and transit availability, will tend to exhibitsimilarly low VMT. In areas where the existing VMT generation already falls below the applicable thresholds, and where projects are likely to generate similar levels of VMT, projects may be screened out of preparing detailed VMT analysis.

Findings: The TIS in Appendix D utilized the SCAG Travel Demand Forecasting Model to establish VMT performance for individual Traffic Analysis Zones (TAZ). The VMT values for each TAZ are then compared to the applicable City thresholds (i.e., VMT per capita, per employee, or per service population) to determine if the TAZ can be considered a low VMT area. Locations within the City of San Marino which qualify for the low VMT area screening are to be identified through the VMT Evaluation Tool.   The Project Site is situated within TAZ 22139300, which currently exhibits 27.95 total VMT per service population. The threshold for office project types is noted as

29.77 total VMT per service population. Therefore, the TAZ currently exhibit VMT below the applicable thresholds and could be considered a low VMT area. The Proposed Project site therefore meets the low VMT area screening criterion.
 Project Type Screening ‐ Consistent with the OPR’s Technical Advisory, the City of San Marino has determined potential screening criteria for certain land development projects that may be presumed to result in a less than significant VMT impact as mentioned in the City’s adopted Resolution No. 20‐18. Among the land uses exempt include community institutions and projects generating less than 110 trips per day (which is consistent with the OPR Technical Advisory). As mentioned in the City’s Resolution and OPR’s Technical Advisory, local serving uses typically redistributes and reroutes local trips rather than create new trips. By adding local serving opportunities into the urban fabric and thereby improving destination proximity, local‐serving projects tends to shorten trips and reduce VMT.

Findings: The Proposed Project will serve the local population and is considered a community institution, thereby shortening travel distances and reducing VMT. Thus, the Proposed Project can be presumed to result in a less than significant VMT impact based on State guidance because it would reduce VMT by shortening trip lengths, similar to local‐serving retail developments and local‐serving projects. Therefore, the Proposed Project satisfies the criteria to be considered a local serving use and is screened out from further VMT analysis as it is presumed to cause less than significant transportation impacts.

As part of the NOP process, the City received a comment letter from Caltrans regarding the TIS provided in the 2022 Initial Study and NOP (Appendix A). Specifically, Caltrans agreed that the Project meets the criteria to be screened out of VMT analysis as it will serve the local population and is considered a community institution, thereby shortening travel distances and reducing VMT.

Therefore, as identified in the Initial Study, there is a less than significant impact because the Proposed Project would not conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b), and no mitigation is required.

Page 180 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 74

5.4.6 Mitigation Measures
The 2022 Initial Study identified that the Proposed Project was consistent with the City’s circulation standards and was consistent with VMT standards for transportation impacts. The additional analysis provided in this DEIR confirmed the analysis in the Initial Study. As such, impacts are less than significant, and no mitigation measures are required.

5.4.7 Level of Significance After Mitigation
The 2022 Initial Study identified that the Proposed Project was consistent with the City’s circulation standards, and no mitigation measures are required to reduce impacts to less than significant. Therefore, the Project impacts remain less than significant after the evaluation contained in this DEIR.

5.4.8 Cumulative Impacts
Cumulative impacts of the Project traffic, combined with proposed area growth and the school activities were analyzed in the 2022 Initial Study and in the TIS (Appendix D). An expanded analysis was provided in this DEIR. The Proposed Project’s cumulative impacts were determined to be less than significant, and no mitigation is required.

Page 181 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 75
6 OTHER CEQA CONSIDERATIONS
This chapter discusses the growth‐inducement potential of the Proposed Project, the significant environmental effects that cannot be avoided if the project is implemented, and the significant irreversible changes associated with the proposed project.

6.1 GROWTH‐INDUCING IMPACTS
This section analyzes the growth‐inducement potential of the proposed project, as required by the CEQA.

CEQA Guidelines Section 15126.2(d) requires that an environmental impact report (EIR) evaluate the growth‐inducing impacts of a project. A project is considered growth inducing if it would directly or indirectly foster substantial economic or population growth or the construction of a substantial number of additional housing units. Examples of projects that are likely to result in significant adverse growth inducement include extensions or expansions of infrastructure systems beyond what is needed to serve project‐specific demand and the development of new residential subdivisions in areas that are sparsely developed or undeveloped. The environmental effects of project‐induced growth are considered secondary or indirect impacts of the project. Growth can result in a variety of indirect environmental impacts, including increased demand on community services and public service infrastructure, increased traffic and noise, and degradation of air and water quality.

Discussion
The Proposed Project will have no effect on economic or population growth, nor will it require or result in the development of additional housing. There are no obstacles to population growth that the Proposed Project would alleviate thereby requiring the construction of additional facilities which may directly or indirectly result in a significant impact to the environment, either individually or cumulatively. The City owns the building and currently offers recreational programs for the community from that location. For the reasons stated herein, the project will not be growth‐inducing.

6.2 SIGNIFICANT AND UNAVOIDABLE IMPACTS
A proposed project’s significant environmental effects which cannot be avoided are analyzed in accordance with the following CEQA Guideline:
15126.2 (b) Significant Environmental Effects Which Cannot be Avoided if the Proposed Project is Implemented.

Describe any significant impacts, including those which can be mitigated but not reduced to a level of insignificance. Where there are impacts that cannot be alleviated without imposing an alternative design, their implications and the reasons why the project is being proposed, notwithstanding their effect, should be described.

Mitigation measures have been identified in Section 5.1.6, (Cultural Resources) of the DEIR that are intended to mitigate Project effects to the extent feasible. However, even with the mitigation measures included in the Cultural Resources section (based on the Historical Resource Report), the renovation of the SMC to a different architectural style will have significant environmental effects which cannot be avoided.

Similarly in the category of Land Use and Planning (Section 5.2) mitigation measures identified for Section

5.1.6, (Cultural Resources) would also apply asthey could serve to also mitigate the Project’sinconsistency

Page 182 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 76
with the City’s policies regarding historic preservation to the extent feasible. However, even with the mitigation measures included in the Land Use and Planning section, the renovation of the SMC to a different architectural style will have significant environmental effects which cannot be avoided.

6.3 SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES
In accordance with Section 21100(b)(2)(B) of CEQA as well as CEQA Guidelines Sections 15126(c) and 15126.2(c), this section identifies significant irreversible environmental changes that would be caused by implementation of the proposed project. The use of nonrenewable resources during the initial and later phases of a project may be irreversible because large commitments of such resources make removal or non‐use thereafter unlikely. Primary impacts, and particularly secondary impacts (such as highway improvements that provide access to previously inaccessible areas), generally commit future generations to similar uses. Also, irreversible damage can result from environmental accidents associated with a project.

The proposed reconstruction of the SMC, a resource identified by CEQA because it islisted in the California Register of Historical Resources, would constitute a significant irreversible environmental change to a historical resource, according to evaluation identified in Section 5.3.5 of this DEIR. The reconstruction would be similar to demolition of the resource and represent total material impairment of the historical resource; no feasible mitigation measures are available to mitigate the reconstruction of the SMC, as proposed, to a less‐than‐ significant level. Construction of the Proposed Project would result in a minor irreversible and irretrievable commitment of natural resources through the use of fossil fuels and construction materials.

6.4 AREAS OF KNOWN CONTROVERSY
The Community Development Department prepared an Initial Study checklist and published a Notice of Preparation (NOP) for an EIR on January 7, 2022, thereby announcing its intent to prepare and distribute a focused EIR (Appendix A). Publication of the NOP and Initial Study checklist initiated a 30‐day public review and comment period that began on January 7, 2022 and ended on February 7, 2022. Individuals and agencies that received these notices included adjacent property owners and other interested parties.

Based on public comments received during the NOP comment period and scoping meeting, potential areas of controversy for the Proposed Project include the following:

Modernization of an Historic Resource: Beginning in January 2018, the City conducted extensive outreach regarding re‐envisioning the City’s recreation program. Between August and September 2020, the City surveyed the community regarding the needs and appearance of the SMC. One of the survey questions asked the community if the City should restore the original 1950s exterior architecture or remodel it to match other City buildings such as the adjacent Crowell Public Library. Of the 209 responses received, there was no clear consensus as to the architectural style for the SMC. Based on the City’s overall vision in its General Plan, the City Council proceeded to prepare renovation plans, which constitutes the Proposed Project.

Transportation and Parking: Commenters raised concerns during the NOP comment period and scoping meeting regarding the potential for increased traffic congestion and conflicts with

Page 183 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 77
parking. The Huntington Middle School shares its parking lot with the SMC, Crowell Public Library and San Marino Unified School District office. Additionally, the Huntington Middle School completed the BAC in late 2019, but the BAC has not been utilized to itsfull capacity due to COVID‐ 19 pandemic school and community shutdowns. Therefore, it is unknown if the BAC would be utilized for additional or more highly‐attended events, beyond the events and attendance prior to the BAC construction, that would generate an increased demand for parking.

The San Marino City Council serves as the decision‐making body for the Proposed Project. Issues to be resolved by the City Council include: (1) how to mitigate the significant effects of the Proposed Project; (2) whether to reject or approve one of the alternatives to the Proposed Project and other environmental findings; and (3) whether to reject or approve the Proposed Project.

The City Council must also adopt detailed findings on the feasibility of mitigation measures that substantially lessen or avoid the significant effects of the Proposed Project on the environment.

The City Council will decide to adopt the Proposed Project or any of the Project alternatives that would feasibly attain most of the Project Objectives while avoiding orsubstantially reducing any of the significant impacts of the Proposed Project.

Because this DEIR hasidentified adverse environmental effectsthat are unavoidable, before the Proposed Project can be approved the City Council must also determine whether the adverse environmental effects are considered acceptable with consideration given to economic, social, technological, and other relevant benefits of the Proposed Project pursuant to CEQA Section 15093.

Page 184 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 78
7 PROJECT ALTERNATIVES EVALUATION
CEQA Guidelines Section 15126.6 requires that an Environmental Impact Report (EIR) describe a reasonable range of alternatives to the Proposed Project or to the Proposed Project location that would feasibly attain most of the Proposed Project’s objectives while avoiding or lessening any significant environmental impacts. An EIR should evaluate the environmental impacts of the alternatives compared to the Proposed Project. This chapter of the EIR describes and evaluates project alternatives and is intended to implement the requirements set forth in the CEQA Guidelines. This chapter also identifies the Environmentally Superior Project Alternative as required by CEQA Guidelines Section 15126.6(e)(2).

7.1 RATIONALE FOR SELECTION OF ALTERNATIVES
The following discussion covers a reasonable range of feasible alternatives that focuses on avoiding or substantially lessening any significant effects of the Proposed Project, even if these alternatives would not attain all of the Proposed Project objectives or would be more costly. The discussion focuses on alternatives to the Proposed Project that are capable of meeting most of the Project Objectives identified in Section 3.1 of this DEIR. According to the CEQA Guidelines, many factors may be taken into account when addressing the feasibility of alternatives,such as environmental impacts,site suitability asit pertains to various land use designations, economic viability, availability of infrastructure, regulatory limitations, and jurisdictional boundaries. Also, according to CEQA Guidelines Section 15126.6(d), discussion of each alternative should be sufficient “to allow meaningful evaluation, analysis, and comparison with the Proposed Project.” Therefore, the significant effects of each alternative are discussed in less detail than those of the Proposed Project, but in enough detail to provide decision makers with perspective and a reasoned choice among alternatives to the Proposed Project.

Additionally, a No Project Alternative is required to be included in the range of alternatives. An EIR need not consider an alternative whose effects cannot be reasonably identified, whose implementation is remote or speculative, or one that would not achieve most of the basic Proposed Project objectives.

Finally, the Environmentally Superior Alternative shall be identified and if it is the No Project Alternative, the next Environmentally Superior Alternative shall be identified.

The Project alternatives evaluated that are addressed in Section 7 include the following:
 Alternative 1 – Preservation Alternative
 Alternative 2 – No Project Alternative
The above alternatives were selected to avoid or lessen significant impacts associated with the Proposed Project while still meeting the majority of the Project Objectives. The alternatives are compared to the impacts of the Proposed Project. A qualitative summary of the alternatives that compares their potential impactsis provided in Table 7‐1: Analysis Summary for Alternativesto the Proposed Project. As described in Section 3.1, the Proposed Project Objectives are as follows:
 Create architectural, aesthetic continuity along eastbound Huntington Drive between Virginia Road and West Drive by changing the SMC building façade’s architectural features from the existing Modern Colonial Revival to the Spanish‐Mediterranean style that is used by the City’s library on the east and the school campus structures to the west.

Page 185 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 79
 Replace interior aged electrical and mechanical systems with code compliant systems including replacing light fixtures;
 Rehabilitate interior space to house City recreational staff;  Rehabilitate interior space to optimize community use for large and small public and private events; and
 Retrofit and update the facility and grounds with ADA‐compliant features.

7.2 ANALYSIS OF ALTERNATIVE 1 – PRESERVATION

7.2.1 Alternative Description
Alternative 1 assumes the preservation/rehabilitation of the SMC would be conducted in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995) and designed in consultation with a qualified historic preservation consultant that meets Secretary of the Interior’s Professional Qualification Standards in architecture, historic architecture, and architectural history.

As with the Proposed Project, Alternative 1 would also include reconfiguration of the building interior to include offices to accommodate six City Recreation Department staff, optimize the interior public gathering space, replace the heating/air conditioning, plumbing and electrical systems and light fixtures to current building code standards, and various interior and exterior ADA compliance features. And as with the Proposed Project, the proposed interior space reconfiguration under Alternative 1 would be revised from the existing occupancy of 1,020 to an occupancy rating of 1,083.

For the purpose of this evaluation, Alternative 1 assumes the preservation recommendations identified in the Chattel Memo (Appendix B) would be implemented since the memo was prepared by a preservation consultant that meets Secretary of the Interior’s Professional Qualification Standards in architecture, historic architecture, and architectural history.

Alternative 1 would generally consist of the following components as identified in the Chattel Memo:

Building Footprint and Façade:

The Chattel Memo noted that overall, the SMC lacks the aesthetic appeal of its original design due to two porch additions that altered its original massing, the removal of the front planter, and the deterioration of the exterior stucco and weathered wood shakes. Restoring the original footprint by removing both porch additions and rehabilitating of the character‐defining features would significantly enhance the overall aesthetic appeal of the building.

The character‐defining features identified in the Chattel Memo include:
 One‐story rectangular massing with front facing and cross gable roofs;

Page 186 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 80
 Stucco with rectangular grid reveals at parapet;
 Multi‐light steel sash windows, wood grid windows, some with wood bevel frames;  Square steel porch columns with ornamental ironwork; and,  Fenestration pattern of windows and doors at north (primary), east, south (rear), and west elevations.

In general, façade preservation features would include the following:

North Elevation
 Retain and rehabilitate character‐defining features to greatest extent feasible.  Retain wood shake roof or replace with compatible replacement such as red asphalt shingle or flat terracotta tile.
 Patch, repair and repaint stucco, as necessary. Stucco can be painted to be compatible with the library.
 Retain and rehabilitate square steel porch columns and ornamental ironwork, repaint as necessary. Columns and ornamental ironwork can be painted brown to be compatible with trim of the library.
 Rehabilitate and repair steel sash windows, as necessary.  Retain and rehabilitate original paving, as necessary.  Restore original planter at north elevation, match vegetation with library.  Remove two porch additions (east storage addition and west office addition). Ensure that brick chimney is not damaged in removal of east storage addition. Chemically remove overpaint on brick.
 Detail wall and shade canopy to not touch existing building ensuring reversibility, and revise wall and shade canopy design to be subordinate to existing building. Provide only minimal metal infill at existing porch to enclose courtyard.
 Replace existing primary north entry door leaves to match existing.

East Elevation
 Retain and rehabilitate character‐defining features to greatest extent feasible.  Patch, repair and repaint stucco, as necessary. Stucco can be painted to be compatible with the adjacent library.
 Rehabilitate and repair steel sash and wood grid windows, as necessary.  Remove porch addition (east storage addition). Ensure that brick chimney is not damaged in removal of east storage addition. Chemically remove overpaint on brick. Restore steel sash doors that were removed to provide access into addition.

Page 187 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 81
South Elevation
 Retain and rehabilitate character‐defining features to greatest extent feasible.  Patch, repair and repaint stucco, as necessary. Stucco can be painted to be compatible with the adjacent library.
 Rehabilitate and repair steel sash and wood grid windows, as necessary.  Detail wall and shade canopy to not touch existing building ensuring reversibility. Simplify design of the screen wall and trellis to eliminate round arches and detail to be self‐supporting and not attached to the existing building.

West Elevation
 Retain and rehabilitate character‐defining features to greatest extent feasible.  Patch, repair and repaint stucco, as necessary. Stucco can be painted to be compatible with the adjacent library.
 Rehabilitate and repair sheet metal window awnings, repaint as necessary.  Rehabilitate and repair steel sash windows, as necessary.  Remove porch addition (west office addition) Restore missing square steel porch columns with ornamental ironwork.

Exterior features that are anticipated to remain intact or will not be impacted by the proposed improvements include the following:
 The cornerstone of the building inscribed with “San Marino Women’s Club” near the building entry, and;
 The two large oak trees in the front yard adjacent to the front entry.

Interior Improvements
Interior improvements are anticipated to be similar to the Proposed Project except it is likely to retain the existing period light fixtures and retain the logo in the floor tiles.  Add two offices (for a total of three offices);
 Install a folding wall in the main room;
 Upgrade the kitchen, bathrooms, ceiling tiles, and electrical and mechanical systems to current code standards;
 Relamp existing period light fixtures; additional lighting may be installed;  Replace plumbing fixtures with current style fixtures;  Retain entryway flooring containing the San Marino Women’s Club insignia;

Page 188 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 82
 Various upgrades for ADA compliance, including but not limited to: accessible restrooms; appropriate door hardware; door widths, thresholds; correct access to stage from main floor (from only stairs to stair and personnel lift);
 Update paint and carpet; and
 Conduct other deferred maintenance items.

Interior features that are not anticipated to be impacted by Alternative 1 include the following:
 Fireside room fireplace and cabinetry; and
 Stage.

Utility/Hardscape/Landscape Improvements
Site utility and hardscape improvements are anticipated to be unchanged from the Proposed Project. Site improvements would include preparation for new ADA parking and loading, sidewalk repair, parking lot paving, and landscaping enhancement as necessary that will only require surficial disturbance. As with the Proposed Project, other improvements that will require excavation that will generally vary between 2 to 3 feet wide by 1 to 3 feet deep, depending on the activity (refer to Exhibit 3‐7). The activities that require excavation include but are not limited to the following:
 Install new domestic water service and sewer lines in the same area as the existing lines;  Replace overhead electrical service with new underground electrical service;  Replace landscaping with drought‐tolerant plant materialssuitable for placement underneath oak trees and provide aesthetic continuity with the Crowell Public Library landscaping;  Install new landscape irrigation meter, with pipe replacements, as necessary, in the same location as existing;
 Install new, separate water service for the fire sprinkler system;  Install new footings for new patio site walls and pilasters, trash enclosure, building columns;  Add various upgrades for ADA compliance including but not limited to: accessible paths of travel to entry points from parking lot and correct and appropriate disabled parking space; and  Repair existing building footings and slab where applicable.

7.2.2 Comparison of Effects of Alternative 1 to the Proposed Project Alternative 1 and the Proposed Project are both located on the same site, and they both have elements of demolition and construction. They both require construction using similar construction equipment, interior improvements and utility and hardscape improvements. The main difference between the Proposed Project and Alternative 1 is primarily the demolition, change or reuse of architectural components.

Table 7‐1, located at the end of thissection summarizes how Alternative 1 would compare to the Proposed Project based on the environmental subject areas analyzed in the 2022 Initial Study. Based on the project components as described in Section 7.3.1, Alternative 1 would have no more or similar impacts to the Proposed Project in the subject areas that were found not significant in the 2022 Initial Study: Aesthetics; Agriculture and Forestry; Air Quality; Energy; Geology and Soils; Greenhouse Gas; Hydrology and Water

Page 189 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 83
Quality; Land Use and Planning (area of XI(a) Physically Dividing and Community only); Mineral Resources; Population and Housing; Recreation; Transportation; Utilities and Service Systems; and Wildfire.

Alternative 1 would have no more or similar impacts to the Proposed Project in the subject areas that were found to be less than significant with mitigation incorporated in the 2022 Initial Study: Biological Resources; Cultural Resources (area of V[b] Archaeology only); Hazards and Hazardous Materials; Noise; Public Services; and Tribal Cultural Resources.

However, Alternative 1 represents a less than significant impact in the areas of Cultural Resources (area V[a] Historical Resources) and Land use and Planning (area XI[b] Consistent With Policies), which were thresholds that were identified as having Potentially Significant impacts under the Proposed Project.

Cultural Resources (area V[a] Historical Resources). The CEQA Guidelines Section 15126.4(b) addresses impacts to historical resources and mitigation alternatives as follows:
(1) Where maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of the historical resource will be conducted in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer, the project's impact on the historical resource shall generally be considered mitigated below a level of significance and thus is not significant.

Therefore, because Alternative 1, will be conducted in a manner consistent with the Secretary’s Standards, the impacts of Alternative 1 to Historical Resources would be considered mitigated below a level of significance.

Land use and Planning (area XI[b] Consistent With Policies). San Marino City Code Section 23.18.08 discusses procedures for the City to issue a Certificate of Appropriateness for rehabilitation of historic structures. One requirement is that the project is consistent with the Secretary's Standards and any applicable design guidelines adopted by the City. Alternative 1 will allow the City to make the findings necessary to issue a Certificate of Appropriateness. Alternative 1 is assumes a design that is consistent with the Secretary’s Standards, would align with the General Plan Land Use Chapter Section Three  ‐ Preservation which seeksto preserve the historicalstructuresin San Marino. Therefore, the Project would be consistent with findings that need to be made pursuant to Chapter XXIII, Article 18, Section 23.18.07 San Marino City Code in order to issue a Certificate of Appropriateness when renovating historic buildings.

With respect to the Public Services(Schools) and Transportation issues, Alternative 1 would have the same impact as the Proposed Project, and all mitigation measures identified for those resource categories would apply to Alternative 1.

7.3 ANALYSIS OF ALTERNATIVE 2 – NO PROJECT

7.3.1 Description
The No Project Alternative assumes that the Proposed Project would not be performed, and the existing conditions would remain. Because no improvements would occur on the Proposed Project site, this alternative would not meet any of the Proposed Project objectives.

Page 190 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 84

7.3.2 Comparison of Effects of Alternative 2 to Proposed Project Alternative 2 would leave the SMC intact and would not make any changes to the exterior or interior of the building. Table 7‐1, located at the end of this section, summarizes how Alternative 2 would compare to the Proposed Project based on the environmental subject areas analyzed in the 2022 Initial Study.

Alternative 2 would not result in a significant adverse impact to the SMC, a historic resource. Therefore, there would be a less than significant effect in the area of Cultural Resources – Historical Resources and no impact to conflicting with City preservation policies With respect to the Public Services (Schools) and Transportation issues, Alternative 2 would have a lesser impact than Proposed Project because the facility would not be reconfigured to optimize use.

7.4 ENVIRONMENTALLY SUPERIOR ALTERNATIVE
CEQA Guidelines Section 15126.6(e)(2) requires identification of an environmentally superior alternative if the Proposed Project has significant impacts that cannot be mitigated to a less‐than significant level.

The environmentally superior alternative is the alternative that best avoids or lessens any significant and unavoidable effects of the proposed project, even if the alternative would impede, to some degree, the attainment of some of the project objectives. The No Project Alternative is considered the overall environmentally superior alternative because implementation of the Proposed Project would not occur; therefore, no significant impacts related to historic resources and land use policy conflicts would occur. If the No Project Alternative is environmentally superior, CEQA requires selection of the “environmentally superior alternative other than the No Project Alternative” from among the other alternatives evaluated.

Therefore, Alternative 1 (the Preservation Alternative), is the environmentally superior alternative and would result in less than significant impacts related to historic resources and land use policy conflicts.

Alternative 1 would rehabilitate the SMC in such a way as not to impair its historic integrity and ability to convey its historic significance and allow it to comply with City preservation standards. Alternative 1 would not result in significant and unavoidable environmental impacts.

Page 191 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 85
Table 7‐1: Analysis Summary for Alternatives to the Proposed Project Alternatives
1 2
Issue Area Proposed Project Mitigation Measure
Redesign Project to
be Consistent with
Historic Preservation
Standards
No Project
I. Aesthetics
a. Scenic Vista LST ▬ ▬b. Conflict with Applicable Zoning LST ▬ ▬c. New light sources LST ▬ ▬ II. Agricultural Resources
a. Convert Farmland NS ▬ ▬b. Conflict with zoning or Williamson Act NS ▬ ▬c. Forest Land Conversion NS ▬ ▬d. Convert to non‐forest/non‐ag use NS ▬ ▬ III. Air Quality
a. Conflict with AQ Plan LST ▬ ▼b. Increase criteria pollutant LST ▬ ▼c. Expose sensitive receptors to pollutants LST ▬ ▼d. Odors LST ▬ ▼ IV. Biological Resources
a. Endangered species LST‐M BIO‐1 ▬ ▼b. Riparian habitat NS ▬ ▬c. Wetlands NS ▬ ▬d. Movement of migratory species NS ▬ ▬e. Conflict with preservation policy/ordinance LST‐M BIO‐2 ▬ ▼f. Conflict with adopted habitat plan NS ▬ ▬ V. Cultural Resources
a. Historical resource SU CUL‐2, CUL‐3, CUL‐4 ▼ ▼b. Archaeological resource LST‐M CUL‐1 ▬ ▼c. Human remains NS ▬ ▬

Page 192 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 86
Alternatives
1 2
Issue Area Proposed Project Mitigation Measure
Redesign Project to
be Consistent with
Historic Preservation
Standards
No Project
VI. Energy
a. Wasteful use of energy ▬ ▬b. Conflict with policies ▬ ▬ VII. Geology and Soils
a. Alquist‐Priolo fault, seismic, landslides, liquefaction LST to NS ▬ ▬b. Soil erosion NS ▬ ▬c. Unstable geologic unit NS ▬ ▬d. Expansive soil NS ▬ ▬e. Septic system support NS ▬ ▬f. Paleontological resources LST‐M CUL‐1 ▬ ▼ VIII. Greenhouse Gas (GHG)
a. Generate GHG LST ▬ ▬b. Conflict with policy LST ▬ ▬
IX. Hazards/Hazardous materials
a. Transport LST ▬ ▬b. Upset/Release LST‐M HAZ‐1 ▬ ▼c. Handling near schools LST‐M HAZ‐1, HAZ‐2 ▬ ▼d. Haz waste site Proximity LST ▬ ▬e. Airport hazards NS ▬ ▬f. Evacuation plan interference LST‐M HAZ‐2, HAZ‐3 ▬ ▼g. Wildland fire exposure NS ▬ ▬ X. Hydrology/Water Quality
a. Water quality standards violation LST ▬ ▬b. Decrease groundwater supplies LST ▬ ▬c. Alter site drainage patterns NS ▬ ▬d. Release pollutants in a flood NS ▬ ▬e. Conflict with groundwater management plans NS ▬ ▬ XI. Land Use and Planning
a. Physically divide community NS ▬b. Conflict with policies SU CUL‐2, CUL‐3, CUL‐4 ▼ ▼

Page 193 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 87
Alternatives
1 2
Issue Area Proposed Project Mitigation Measure
Redesign Project to
be Consistent with
Historic Preservation
Standards
No Project
XII. Mineral Resources
a. Loss of state resources NS ▬ ▬b. Loss of local resource NS ▬ ▬ XIII. Noise
a. Temp or per above established standards LST‐M NOI‐1 ▬ ▼b. Groundborne vibration LST ▬ ▼c. Airport noise NS ▬ ▬ XIV. Population and Housing
a. Induce growth NS ▬ ▬b. Housing displacement and new NS ▬ ▬ XV. Public Services
a. Fire LST ▬ ▬b. Police LST ▬ ▬c. Schools LST‐M PS‐1, PS‐2, PS‐3, PS‐4, PS‐5 ▬ ▼d. Parks LST ▬ ▬e. Other LST ▬ ▬ XVI. Recreation
a. Increase use of other facilities LST ▬ ▲b. Build new or expand other rec facilities LST ▬ ▲ XVII. Transportation/Traffic
a. Conflict with plans LST ▬ ▬b. Vehicle miles traveled LST ▬ ▬c. Hazardous design feature NS ▬ ▬d. Inadequate emergency access LST ▬ ▬ XVIII. Tribal Cultural Resources
a. Listed resource LST‐M TCR‐1 ▬ ▼b. Local known resource LST‐M TCR‐1, TCR‐2, TCR‐3 ▬ ▼

Page 194 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 88
Alternatives
1 2
Issue Area Proposed Project Mitigation Measure
Redesign Project to
be Consistent with
Historic Preservation
Standards
No Project
XIX. Utilities and Service Systems
a. Require new or expanded services LST ▬ ▬b. Available water LST ▬ ▬c. Adequate wastewater LST ▬ ▬d. Solid waste LST ▬ ▬e. Solid waste policies NS ▬ ▬ XX. Wildfire
a. Impair emergency evacuation LST ▬ ▬b. Exacerbate wildfire spread NS ▬ ▬c. Installation of fire breaks NS ▬ ▬d. Expose people to post‐fire effects NS ▬ ▬ Notes:SU = Potentially significant and unavoidable;
LTS‐M = Less than significant with mitigation incorporated; NS = Not significant or Less Than Significant Without Mitigation. ▲ Alternative is likely to result in greater impacts to issue when compared to Proposed Project. ▬ Alternative is likely to result in similar impacts to issue when compared to Proposed Project. ▼ Alternative is likely to result in reduced impacts to issue when compared to Proposed Project.

Page 195 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 89
8 REFERENCES
Architectural Resources Group, Inc., October 6, 2020 (ARG 2020). City of San Marino Citywide Historic Resources Survey Report.

CalFire, https://osfm.fire.ca.gov/divisions/wildfire‐planning‐engineering/wildland‐hazards‐building‐ codes/fire‐hazard‐severity‐zones/‐maps, as accessed 6/18/21.

Castillo, Edward D. 1978. “The Impact of Euro‐American Exploration and Settlement,” In Handbook of North American Indians, Volume 8, California, edited by R.F. Heizer, pp. 99‐127. William C.

Sturtevant, general editor. Smithsonian Institution, Washington D.C.

California Office of Historic Preservation Department of Parks & Recreation (OHP) (March 2001), Technical Assistance Series 1, California Environmental Quality Act (CEQA) & Historical Resources.

City of San Marino Municipal Code.

City of San Marino, October 8, 2003. Final Draft General Plan.

City of San Marino (February 5, 2018). Huntington Drive Safe Streets Corridor Plan.

City of San Marino, February 13, 2019 (CSM, Feb 2019). Local Hazard Mitigation Plan.

City of San Marino, May 2019. City of San Marino Sewer System Management Plan.

Electric Railway Historical Association, “Sierra Madre Line” as accessed http://www.erha.org/pensm.htm on 6/19/2021.

Federal Rail Administration (FRA) Guidelines (Report Number 293630‐1), December 1998. gkk Works, December 21, 2017. Program Needs Assessment Report Amendment 2017 for the San Marino Unified School District. Amendment to Original Document prepared by Carmichael‐Kem Architects.
gkk Works, August 13, 2018. Update to the 2013 Assessment of School Safety and Security Measures.

Linscott, Law & Geenspan (LLG), Sept 21, 2021. Transportation Impact Study, San Marino Center Improvement Project.

Meyer, Mohaddes Associates, Inc., August 1994. City of San Marino Circulation Element.

Office of Planning and Research (OPR), December 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA.

Personal Communication, June 5, 2021. Julie Gilbert interview with Gil Cardenas, San Marino Unified School District Maintenance and Operations Supervisor.

Page 196 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 90
San Gabriel Basin Water Quality Authority, January 22, 2008 (SGBWQA, January 2008). San Gabriel Basin Groundwater Quality Management and Remediation Plan §406 Plan.

San Marino Tribune, January 7, 2016. A Tradition of Volunteerism: San Marino Woman’s Club.

State Water Resources Control Board Geotracker, as accessed 6/6/21:
https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=1800+Huntington+D rive%2C+San+Marino#.

State of California, Department of Conservation, Farmland Mapping and Monitoring Program. https://maps.conservation.ca.gov/DLRP/CIFF, as accessed May 22, 2021.

State Water Resources Control Board Geotracker, as accessed 6/6/21:
https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=1800+Huntington+Driv e%2C+San+Marino#.

U.S. Department of the Interior, National Park Service, Cultural Resources (1997). How to Apply the National Register Criteria for Evaluation.

United States Dept of Agriculture, Natural Resources Conservation Service, Web Soil Survey, https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx, as accessed May 22, 2021 (USDA May 2021).

Vista Environmental Consulting (Vista), November 29, 2021. Comprehensive Hazardous Materials Survey Report.

Page 197 of 458 ends

Draft Environmental Impact Report
San Marino Center Improvement Project – San Marino, California March 2022 91
9 LIST OF PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

9.1 DEIR PREPARERS
This DEIR was prepared by the City of San Marino, Community Services Department. The following professional staff participated in its preparation:

9.1.1 City of San Marino
Isidro Figueroa, Community Development Director
Michael Throne, Public Works Director / City Engineer

9.1.2 DEIR Preparation Team
Travis McGill, ELMT Consulting, Project Manager
Julie Gilbert, ELMT Consulting, Environmental Planner
Clare Look‐Jaeger, PE, Linscott, Law & Greenspan Engineers – consultant for Transportation Ryan Birdseye, Birdseye Planning – consultant for Air Resources, GHG, Energy, Noise David Brunzell, BCR Consulting – consultant for Cultural Resources

Page 198 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX A

NOTICE OF PREPARATION AND NOP COMMENTS

Page 199 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094
Notice of Preparation

Page 200 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094
Comments Received on Notice of Preparation

Page 201 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094
Scoping Meeting Materials and Comment Summary
January 12, 2022

Page 202 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX B

CHATTEL HISTORIC PRESERVATION ARCHITECT TECHNICAL MEMO, NOVEMBER 15, 2021

Page 203 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX C

PROPOSED SITE PLAN, LAYOUT AND LANDSCAPE PLANS

Page 204 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX D
TRAFFIC IMPACT STUDY – SAN MARINO IMPROVEMENT PROJECT,
FEBRUARY 23, 2022

Page 205 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX E

TRAFFIC CIRCULATION REVIEW FOR HUNTINGTON MIDDLE SCHOOL, JULY 31, 2018

Page 206 of 458 ends

DRAFT ENVIRONMENTAL IMPACT REPORT
San Marino Center Improvement Project
SCH No. 2022010094

APPENDIX F
INTIAL STUDY – SAN MARINO CENTER IMPROVEMENT PROJECT,
JANUARY 2022

Page 207 of 458 ends

THIS PAGE LEFT BLANK INTENTIONALLY

Page 208 of 458 ends

RESOLUTION NO. R-22-25

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN

MARINO, CERTIFYING THE FINAL ENVIRONMENTAL IMPACT

REPORT FOR THE SAN MARINO CENTER IMPROVEMENT
PROJECT (SCH NO. 2022010094), APPROVING ALTERNATIVE 1
(PRESERVATION ALTERNATIVE), ADOPTING FINDINGS OF FACT

PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY

ACT, ADOPTING A MITIGATION MONITORING AND REPORTING
PROGRAM, APPROVING PROJECT PLANS AND SPECIFICATIONS;

AND AUTHORIZING THE PARKS AND PUBLIC WORKS DIRECTOR

TO ADVERTISE FOR CONSTRUCTION BIDS FOR THE SAN MARINO
IMPROVEMENT PROJECT LOCATED AT 1800 HUNTINGTON
DRIVE.

WHEREAS, in January 2018, the City conducted extensive outreach regarding re‐envisioning the City’s recreation program; and
WHEREAS, in 2020, the City Council (Council) formed the San Marino Task Force (Task Force) to discuss how to revitalize and improve the San Marino Center (SMC) located at 1800 Huntington Drive.

WHEREAS, the Task Force focused on how to encourage better use of the facility, the need for facility repair and renovation and the need to create aesthetic continuity with the adjacent public buildings.

WHEREAS, through a number of meetings and public hearings, the Task Force recommended the following project objectives: (1) create architectural, aesthetic continuity along eastbound Huntington Drive between Virginia Road and West Drive by changing the SMC building façade’s architectural features from the existing Modern Colonial Revival to the Spanish-Mediterranean style which contain architectural features noted by the City’s library on the east and the school campus structures to the west; (2) replace interior aged electrical and mechanical systems with code compliant systems including replacing light fixtures; (3) rehabilitate interior space to house City recreational staff; (4) rehabilitate interior space to optimize community use for large and small public and private events; and (5) retrofit and update the facility and grounds with ADA-compliant features.

WHEREAS, on December 9, 2020, the City Council selected a floor plan scheme and exterior elevations for the renovation of the SMC.

WHEREAS, as the proposed improvements to the SMC constitute a “Project” as defined by the California Environmental Quality Act (CEQA) (Public Resources Code Sections 21000 et seq.) and the CEQA Guidelines, ELMT Consulting was hired by the City Council on December 9, 2020 to conduct the required environmental impact analysis and prepare the appropriate CEQA documents for the project.; and
WHEREAS, pursuant to section 21067 of the Public Resources Code, and section 15367 of the

Page 209 of 458 ends

CITY OF SAN MARINO RESOLUTION NO. R-22-25

Page 2 of 5 ends

State CEQA Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.), the City of San Marino is the lead agency for the proposed Project; and
WHEREAS, in accordance with State CEQA Guidelines section 15063, the City prepared an Initial Study to determine whether an environmental impact report (“EIR") was required for the proposed Project; and WHEREAS, based on the Initial Study, the City determined that an EIR should be prepared because the Project may have a significant effect on the environment; and WHEREAS, in accordance with State CEQA Guidelines section 15082, on Jan 7,2022 the City sent to the Office of Planning and Research a Notice of Preparation (NOP) stating that an Environmental Impact Report (State Clearinghouse (SCH) No. 2022010094) (EIR) would be prepared; and
WHEREAS, the City received comment letters in response to the NOP; and WHEREAS, pursuant to Public Resources Code section 21083. 9 and State CEQA Guidelines sections 15082(c) and 15083, the City held a duly noticed Scoping Meeting on January 12, 2022, to solicit comments on the scope of the environmental review of the proposed Project and several oral and written comments were received; and
WHEREAS, a Draft Environmental Impact Report (DEIR) was prepared, incorporating comments received in response to the NOP; and
WHEREAS, in accordance with State CEQA Guidelines section 15085, a Notice of Completion was prepared and filed with the Office of Planning and Research on January 7, 2022; and WHEREAS, as required by State CEQA Guidelines section 15087( a), on March 15, 2022, the City provided Notice of Availability of the DEIR, which was available for a 30-day public review period from March 15, 2022 to April 14, 2022; and
WHEREAS, during the public comment period, copies of the DEIR and technical appendices were available for review and inspection at City Hall, on the City' s website, and at the Crowell Public Library; and
WHEREAS, pursuant to State CEQA Guidelines section 15088. 5, the City has prepared written responses to all comments submitted on the DEIR; and
WHEREAS, the City has prepared a Final Environmental Impact Report Final (Final EIR) which consists of the Initial Study, the DEIR and its associated technical appendices, the comments and responses to comments on the DEIR, the minor modifications made to the DEIR and a Mitigation Monitoring and Reporting Program; and
WHEREAS, on June 8, 2022, the City Council conducted a duly noticed public meeting to consider the Final EIR and the proposed project, and to solicit comments on the documents from staff, the public, and the City' s consultant team; and WHEREAS, as contained herein, the City has endeavored in good faith to set forth the basis for its decision on the Final EIR and Project; and

Page 210 of 458 ends

CITY OF SAN MARINO RESOLUTION NO. R-22-25

Page 3 of 5 ends

WHEREAS, all of the requirements of the CEQA statute in the Public Resources Code and the State CEQA Guidelines have been satisfied by the City in connection with the preparation of the Final EIR, which is sufficiently detailed so that all of the potentially significant environmental effects of the Project have been adequately evaluated; and WHEREAS, the Final EIR sufficiently analyzes the project’s potentially significant environmental impacts and a reasonable range of feasible alternatives capable of reducing these effects to less than significant levels to the extent feasible; and WHEREAS, all of the findings and conclusions made by the City Council pursuant to this Resolution, including but not limited to the CEQA Findings of Fact attached hereto as Exhibit A, are based upon the oral and written evidence presented to it as a whole and the entirety of the administrative record of the Project, which are incorporated herein by this reference, and not based solely on the information provided in this Resolution; and WHEREAS, environmental impacts identified in the Final EIR that the City Council finds are less than significant and do not require mitigation are described in the CEQA Findings in Exhibit A attached hereto; and
WHEREAS, environmental impacts identified in the Final EIR that the City Council finds are potentially significant but can be mitigated to a level of less than significant, through the imposition of feasible mitigation measures identified in the Final EIR, are described in the CEQA Findings in Exhibit A attached hereto; and
WHEREAS, alternatives to the Proposed Project that might eliminate or reduce significant environmental impacts are described in Exhibit A attached hereto; and WHEREAS, the Mitigation Monitoring and Reporting Program, which sets forth the binding mitigation measures for the Project, is attached hereto as Exhibit B; and WHEREAS, the Final EIR reflects the independent judgment of the City, was prepared in compliance with CEQA and the CEQA Guidelines and is fully adequate for purposes of making decisions on the merits of the Project; and
WHEREAS, no comments made or information presented during or after the public review of the Draft EIR has produced any significant new information requiring recirculation of the DEIR or additional environmental review of the project under Public Resources Code section 21092.1 or State CEQA Guidelines section 15088.5; and
WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred.

THEREFORE, BE IT RESOLVED by the City Council of the City of San Marino, California, as follows:

SECTION 1. The City Council hereby declares that the recitals set forth above are true and correct, and incorporated into this resolution as findings of the City Council.

Page 211 of 458 ends

CITY OF SAN MARINO RESOLUTION NO. R-22-25

Page 4 of 5 ends

SECTION 2. FINDINGS FOR CERTIFICATION OF THE FINAL EIR. Based upon the above recitals and the entire record, including, without limitation, the Final EIR for the San Marino Improvement Project, oral and written testimony and other evidence received at the public hearings held on the Project and the Final EIR, upon studies and investigation made by the City Council, and upon reports and other transmittals from City staff to the City Council, the City Council finds the following:

A. That the City Council has independently reviewed and considered the EIR for the Project, which consists of the Initial Study, the Draft EIR and the Final EIR, before reaching any conclusions on the adequacy of the EIR and the decision whether to approve the Project; and
B. That the EIR reflects the City Council’s independent judgment and analysis; and C. That the EIR is adequate, complete and has been prepared in full compliance with the requirements of CEQA and the CEQA Guidelines and thus that the EIR should and hereby is certified on that basis.

SECTION 3. FINDINGS FOR APPROVAL OF THE PROJECT. Having certified the EIR and based on its desire to avoid and/or reduce all of the Project’s potential impacts to levels of insignificance, the City Council hereby finds the following:

A. That the City Council accepts and approves the Preservation Alternative described in the EIR and directs that the Preservation Alternative be implemented in lieu of the Proposed Project.

B. That the City Council approves the Preservation Alternative for the reasons stated in the CEQA Findings of Fact attached hereto as Exhibit A and subject to the measures listed in the Mitigation Monitoring and Reporting Program attached hereto as Exhibit B, both of which are also hereby adopted and approved by the City Council.

C. The City Council hereby identifies that the Final EIR and all other documents and materials constituting the record of proceedings with respect to the certification of the Final EIR and approval of the project can be found at the Community Development Department of the City of San Marino located at 200 Huntington Drive, San Marino, CA 91108, and that the custodian of those records is the Director of Community Development of the City of San Marino.

SECTION 4. The City Council directs that, upon approval of the Project, the City’s Community Development Department shall file a notice of determination with the County Clerk of Los Angeles County and with the State Office of Planning and Research, pursuant to the provisions of CEQA section 21152.

SECTION 5. Severability: If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Resolution is, for any reason, held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Resolution. The City Council hereby declares that it would have adopted this Resolution and each and every section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared unconstitutional.

SECTION 6. Effective Date: This Resolution shall become effective immediately upon adoption.

Page 212 of 458 ends

CITY OF SAN MARINO RESOLUTION NO. R-22-25

Page 5 of 5 ends

PASSED, APPROVED AND ADOPTED, at a meeting of the City Council of the City of San Marino, California, on this 8th day of June, 2022.

SUSAN JAKUBOWSKI, MAYOR

ATTEST:

CHRISTINA BAKER, CITY CLERK

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SAN MARINO )
I, Christina Baker, City Clerk of the City of San Marino, California, hereby certify that Resolution No. R-22-25 was adopted by the City Council of the City of San Marino at a regular meeting held on the 8th day of June, 2022, and that the same was adopted by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
________________________________

CHRISTINA BAKER, CITY CLERK

CITY OF SAN MARINO

EXHIBITS
A. CEQA Findings of Fact
B. Mitigation Monitoring and Reporting Program

Page 213 of 458 ends

THIS PAGE LEFT BLANK INTENTIONALLY

Page 214 of 458 ends

CEQA FINDINGS OF FACT
San Marino Center Improvement Project
SCH No. 2022010094
Prepared for:

City of San Marino
Community Development Department
2200 Huntington Drive
San Marino, CA 91108
Contact:  Isidro Figueroa
Prepared by:

ELMT Consulting, Inc.
2201 N. Grand Avenue #10098
Santa Ana, CA 92711
Contact:  Julie Gilbert
May 2022

Page 215 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino
May 2022   ii
This Page Intentionally Left Blank

Page 216 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 3 ends

TABLE OF CONTENTS
1 BACKGROUND.............................................................................................................................. 5 2 PROJECT SUMMARY ..................................................................................................................... 5

2.1 PROJECT LOCATION................................................................................................................... 5

2.2 PROJECT SETTING...................................................................................................................... 5

2.3 PROJECT OBJECTIVES................................................................................................................. 5

2.4 PROJECT OVERVIEW.................................................................................................................. 6 3 ENVIRONMETNAL REVIEW PROCESS............................................................................................. 6

3.1 RECORD OF PROCEEDINGS........................................................................................................ 7

3.2 CUSTODIAN AND LOCATION OF RECORDS................................................................................ 8

3.3 INDEPENDENT JUDGMENT AND FINDING................................................................................. 8 4 FINDING ....................................................................................................................................... 8

4.1 FINDINGS OF FACT..................................................................................................................... 8

4.2 FORMAT...................................................................................................................................10

4.3 FINDINGS FOR ENVIRONMENTAL EFFECTS DETERMINED TO HAVE NO IMPACT ...................10

4.4 FINDINGS FOR ENVIRONMENTAL EFFECTS DETERMINED TO BE LESS THAN SIGNIFICANT (NO MITIGATION REQUIRED) ......................................................................................................... 11

4.4.1 Aesthetics..................................................................................................................... 11

4.4.2 Air Quality .................................................................................................................... 12

4.4.3 Energy .......................................................................................................................... 13

4.4.4 Geology and Soils......................................................................................................... 13

4.4.5 Greenhouse Gas........................................................................................................... 13

4.4.6 Hazards and Hazardous Materials ............................................................................... 14

4.4.7 Hydrology and Water Quality ...................................................................................... 14

4.4.8 Noise ............................................................................................................................ 15

4.4.9 Public Services.............................................................................................................. 15

4.4.10 Recreation.................................................................................................................... 16

4.4.11 Transportation ............................................................................................................. 16

4.4.12 Utilities and Service Systems ....................................................................................... 17

4.4.13 Wildfire ........................................................................................................................ 17

4.5 FINDINGS FOR ENVIRONMENTAL EFFECTS MITIGATED TO LESS THAN SIGNIFICANT ............18

4.5.1 Biological Resources..................................................................................................... 18

4.5.2 Cultural Resources....................................................................................................... 19

4.5.3 Geology and Soils......................................................................................................... 20

Page 217 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 4 ends

4.5.4 Hazards and Hazardous Materials ............................................................................... 21

4.5.5 Noise ............................................................................................................................ 23

4.5.6 Public Services (Schools).............................................................................................. 24

4.5.7 Tribal Cultural Resources............................................................................................. 27

4.6 FINDINGS ON SIGNIFICANT UNAVOIDABLE IMPACTS ............................................................. 30

4.6.1 Cultural Resources....................................................................................................... 31

4.6.2 Land Use and Planning................................................................................................. 33

4.7 FINDINGS ON PROJECT ALTERNATIVES ................................................................................... 35

4.7.1 Alternative 1 ‐ Preservation......................................................................................... 36

4.7.2 Alternative 2 ‐ No Project ............................................................................................ 38

4.8 FINDINGS ON RECIRCULATION................................................................................................ 38

4.8.1 New Information Standard .......................................................................................... 38

4.8.2 Clarification/Amplification Standard ........................................................................... 39 5 GENERAL CEQA FINDINGS........................................................................................................... 40 6 LEGAL EFFECTS OF THE FINDINGS ............................................................................................... 42

Page 218 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 5 ends

1 BACKGROUND
This statement of Findings of Fact (Findings) addresses the environmental effects associated with the proposed San Marino Improvement Project (Project), as described in the Final Environmental Impact Report (Final EIR). These Findings are made pursuant to the California Environmental Quality Act (CEQA) (California Public Resources Code [PRC] § 21000 et seq.), specifically PRC §§ 21081, 21081.5, and 21081.6, and the CEQA Guidelines (14 California Code of Regulations [CCR] 15000 et seq.), specifically §§ 15091 and 15093.

The lead agency is responsible for the adequacy and objectivity of the EIR. The City of San Marino (City), as lead agency, has subjected the Draft EIR and Final EIR to the agency’s own independent review and analysis.
2 PROJECT SUMMARY

2.1 Project Location
The Project is the existing San Marino Center (SMC) located at 1800 Huntington Drive, San Marino, on the south side of Huntington Drive, between West Drive on the east and Virginia Road on the west and is identified as Los Angeles County Assessor’s Parcel Number (APN) 5334‐024‐903. The Project site is adjacent to and east of the Huntington Middle School and west of and adjacent to the Crowell Public Library and contains the SMC building and associated landscaping.

2.2 Project Setting
The SMC building was originally constructed in 1952 by the San Marino Woman’s Club to hold community events and club meetings. In 2005, the City purchased the SMC from the San Marino Women’s Club to use as a community center and meeting space for senior and youth recreation programs, and community events and other activities, and has been utilizing the SMC for that purpose since its purchase. In 2011, the California State Historic Preservation Office (SHPO) found the SMC eligible for inclusion in the National Register of Historic Places for its social connection to the community as the City’s first community center during a federal site review related to federal grant funds to be used for various building improvements for Americans with Disabilities Act (ADA) compliance.

2.3 Project Objectives
In 2020, the City formed a working group to discuss how to revitalize and improve the SMC. The primary discussions of the working group focused on how to encourage better use of the facility, the need for facility repair and renovation and the need to create aesthetic continuity with the adjacent public buildings. Through a number of meetings and public hearings, the City working group recommended the following Project Objectives:
1) Create architectural, aesthetic continuity along eastbound Huntington Drive between Virginia Road and West Drive by changing the SMC building façade’s architectural features from the existing Modern Colonial Revival to the Spanish‐Mediterranean style which contain architectural features noted by the City’s library on the east and the school campus structures to the west.

Page 219 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 6 ends

2) Replace interior aged electrical and mechanical systems with code compliant systems including replacing light fixtures;
3) Rehabilitate interior space to house City recreational staff; 4) Rehabilitate interior space to optimize community use for large and small public and private events; and
5) Retrofit and update the facility and grounds with ADA‐compliant features.

2.4 Project Overview
The Proposed Project will make both exterior and interior modifications to the San Marino Center (SMC).

The exterior upgrades will change the existing architectural style of the building façade from “Modern Colonial Revival” to a “Spanish Mediterranean” architectural style which is similar to that of the adjacent Crowell Public Library and the San Marino Unified School District buildings.

Building interior upgrades include but are not limited to: adding offices to accommodate six City Recreation Department staff; optimizing the interior public gathering space; replacing to current standards the heating/air conditioning, plumbing, and electrical systems; and replacing the period light fixtures and flooring with modern fixtures and flooring. Other updatesinclude various exterior and interior improvements for compliance with the Americans with Disabilities Act (ADA). 3 ENVIRONMETNAL REVIEW PROCESS
The Final EIR includes the San Marino Draft EIR, dated March 2022; written comments received during the Draft EIR public review period; written responses to those comments; and a Mitigation Monitoring and Reporting Program, (hereinafter referred to collectively asthe Final EIR). In conformance with CEQA and the CEQA Guidelines, the City conducted an extensive environmental review of the proposed project. The following is a summary of the City’s environmental review process of this project:
• Pursuant to CEQA Guidelines Section 15082, as amended, the City circulated a Notice of Preparation (NOP) to public agencies and members of the public who had requested such notice for a 30‐day period beginning on January 7, 2022, and ending on February 7, 2022. The Notice of Completion (NOC) of the NOP was submitted to the State Clearinghouse (State Clearinghouse Number 2022010094) and posted at the Los Angeles County Clerk’s office on January 7, 2022, with the 30‐day review period beginning on January 7, 2022, and ending on February 7, 2022.

Copies of the NOP were made available for public review at the City of San Marino City Hall. • To afford interested individuals, groups, and public agencies a forum in which to orally present input directly to the Lead Agency in an effort to assist in further refining the intended scope and focus of the EIR, as described in the NOP, the City held a public scoping meeting on January 12, 2022 at the SMC located at 1800 Huntington Drive, San Marino, California. • A Draft EIR was prepared and distributed for a 30‐day public review period beginning March 15, 2022 and ending April 14, 2022. A NOC for the Notice of Availability (NOA) of the Draft EIR was filed with the State Clearinghouse on March 15, 2022 (State Clearinghouse Number 2022010094) on March 15, 2022. The scope of the Draft EIR was determined, in part, on comments received in response to the NOP; referto Draft EIR Sections 2.5, Summary of Concerns Raised During NOP.

Page 220 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 7 ends

The NOA was sent to interested persons and organizations, to the State Clearinghouse for distribution to public agencies, posted on the City’s website, and published in the San Marino Tribune, Public Notices section, on March 20, 2022.
• During the public review period, hardcopies of the Draft EIR were made available for public review at the City of San Marino Planning and Building Department and at the Crowell Library. • A digital copy of the Draft EIR was also made available on the City of San Marino website. • A Final EIR was prepared in May 2022, which included comments on the Draft EIR, responses to those comments, modifications to the Draft EIR and two Mitigation Monitoring and Reporting Programs, one for the proposed project and one for Project Alternative 1 – Preservation Alternative.

3.1 Record of Proceedings
For purposes of CEQA and these Findings, the Record of Proceedings for the proposed project includes, but is not limited to, the following documents and other evidence:
• The NOP, NOA, and all other public notices issued by the City in conjunction with the proposed project;
• The Draft EIR and Final EIR for the proposed project; • All written comments submitted by agencies or members of the public during the extended public review period of the Draft EIR from March 15, 2022 and ending April 14, 2022; • All responses to written comments submitted by agencies or members of the public during the public review period of the Draft EIR;
• All written and verbal public testimony presented during noticed public hearing(s) for the proposed project;
• The Mitigation Monitoring and Reporting Program;
• The reports and technical memoranda included or referenced in the Final EIR; • All documents, studies, EIRs, or other materials incorporated by reference in the Draft EIR and Final EIR;
• The Resolutions adopted by the City Council in connection with the proposed project, and all documents incorporated by reference therein, including comments received after the close of the comment period and responses thereto;
• Matters of common knowledge to the City, including but not limited to Federal, State, and local laws and regulations; and

Page 221 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 8 ends

• Any documents expressly cited in these Findings.

3.2 Custodian and Location of Records
The documents and other materialsthat constitute the administrative record for the City’s actions related to the project are located at the City of San Marino Planning and Building Department, 2200 Huntington Drive, San Marino, California 91108. The City’s Planning Director is the custodian of the administrative record for the project. Copies of these documents, which constitute the record of proceedings, are and at all relevant times have been and will be available upon request at the offices of the City of San Marino Planning and Building Department. Although all documentsweremade available at the City’s website, City Hall placed a physical copy at the front desk that allowed for sharing hardcopies of documents, if requested. This information is provided in compliance with Public Resources Code Section 21081.6(a)(2) and CEQA Guidelines Section 15091(e).

3.3 Independent Judgment and Finding
The City selected and retained ELMT Consulting Inc. (ELMT) to prepare the San Marino Center Improvement Project EIR. ELMT Consulting prepared the EIR under the supervision and direction of the City. All findingsset forth herein are based on substantial evidence in the record, asindicated, with respect to each specific finding.
4 FINDING
The City has exercised independent judgment in accordance with Public Resources Code Section 21082.1(c)(3) in retaining its own environmental consultant and directing the consultant in the preparation of the EIR. The City has independently reviewed and analyzed the EIR and finds that both the EIR and these findings reflect the independent judgment of the City.

The City Council has considered all the evidence presented in its consideration of the project and the EIR, including, but not limited to, the Draft EIR, the Final EIR, written and oral evidence presented at hearings on the project, and written evidence submitted to the City by individuals, organizations, regulatory agencies, and other entities. On the basis ofsuch evidence, the City Council finds that with respect to each environmental impact identified in the review process, the impact (1) is less than significant and would not require mitigation; or (2) is potentially significant but would be avoided or reduced to less than a significant level by implementation of identified mitigation measures.

4.1 Findings of Fact
The City of San Marino, as lead agency, is required under CEQA to make written findings concerning each alternative and each significant environmental impact identified in the Draft EIR and Final EIR.

Specifically, regarding findings, CEQA Guidelines Section 15091 provides:
(a) No public agency shall approve or carry out a project for which an EIR has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are:

Page 222 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 9 ends

1. Changes or alterations have been required in, or incorporated into, the project which avoid orsubstantially lessen the significant environmental effect asidentified in the Final EIR.

2. Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency.

3. Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR. (b) The findings required by subsection (a) shall be supported by substantial evidence in the record. (c) The finding in subdivision (a)(2) shall not be made if the agency making the finding has concurrent jurisdiction with another agency to deal with identified feasible mitigation measures or alternatives. The finding in subsection (a)(3) shall describe the specific reasons for rejecting identified mitigation measures and project alternatives. (d) When making the findings required in subdivision (a)(1), the agency shall also adopt a program for reporting on or monitoring the changes which it has either required in the project or made a condition of approval to avoid or substantially lessen significant environmental effects. These measures must be fully enforceable through permit conditions, agreements, or other measures. (e) The public agency shall specify the location and custodian of the documents or other material which constitute the record of the proceedings upon which its decision is based. (f) A statement made pursuant to Section 15093 does notsubstitute for the findingsrequired by this section.

The “changes or alterations” referred to in CEQA Guidelines Section 15091(a)(1) may include a wide variety of measures or actions as set forth in CEQA Guidelines Section 15370, including:
(a) Avoiding the impact altogether by not taking a certain action or parts of an action. (b) Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the impacted environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action.
(e) Compensating for the impact by replacing or providing substitute resources or environments.

Page 223 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 10 ends

4.2 Format
This section summarizes the significant environmental impacts of the project, describes how these impacts are to be mitigated, and discusses various alternatives to the proposed project, which were developed in an effort to reduce the remaining significant environmental impacts. All impacts are considered potentially significant prior to mitigation unless otherwise stated in the findings.

This remainder of this section is divided into the following subsections:
 Section 4.3, Findings Regarding Environmental Effects Determined to Have No Impact, presents the summary of the environmental impacts that were determined to have no impact due to the Project location or Project construction and operational components.  Section 4.4, Findings on Impacts Determined to Be Less Than Significant, presents the impacts of the proposed project that were determined in the EIR to be less than significant without the addition of mitigation measures and presents the rationales for these determinations.  Section 4.5, Findings on Impacts Mitigated to Less Than Significant, presents potentially significant impacts of the proposed project that were identified in the Final EIR, the mitigation measuresidentified in the Mitigation Monitoring and Reporting Program that would reduce these impacts to less than significant levels, and the rationales for the findings.  Section 4.6, Findings on Significant Unavoidable Impacts, presents potentially significant impacts of the proposed project that were identified in the Final EIR, the mitigation measures and project alternatives identified in the EIR that would reduce these impacts to the extent feasible, the findings for significant and unavoidable impacts, and the rationales for the findings  Section 4.7, Findings on Project Alternatives, presents alternatives to the project and makes findings with respect to each.
 Section 4.8, Findings on Recirculation, presents the reasoning as to why recirculation is not required under CEQA Guidelines Section 15088.5.
 Section 5, General CEQA Findings, presents the summary of the CEQA Guidelines in affirmatory statements demonstrating compliance with the CEQA Guidelines.  Section 6, Legal Effects of the Findings, presents the legal obligations of the City in making these findings.

4.3 Findings for Environmental Effects Determined to Have No Impact For the following significance thresholds, the City finds that, based upon substantial evidence in the record, the Project would have no impact; therefore, no mitigation is required, and no significant, unavoidable adverse impacts would occur. Consistent with CEQA Guidelines Sections 15162.2 and 15128, the EIR focused its analysis on potentially significant impacts and limited discussion of other impacts for which it can be seen with certainty there is no potential for significant adverse environmental effects.

Page 224 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 11 ends

CEQA Guidelines Section 15091 does not require specific findings to address environmental effects that an EIR identifies as “no impact.” Supportive evidence for each of the following thresholds and the no impact project determinations is discussed in the Draft EIR, Section 4 and also in the Initial Study.  Agriculture and Forestry Resources (convert Farmlands, Williamson Act conflict, forest land conversion, forest land conversion)
 Biological Resources (impacts on riparian habitats, or wetlands; conflict with applicable habitat conservation plans)
 Cultural Resources (impacts to human remains)
 Geology and Soils (impacts on soil erosion, unstable geologic unit, expansive soil, septic system support)
 Hazards/Hazardous Materials (impacts from airports, wildland fire exposure)  Hydrology/Water Quality (impacts relative to alteration of site drainage patterns, release pollutants in a flood, conflict with groundwater management plans)  Land Use and Planning (impacts from physically dividing a community)  Mineral Resources (loss of state resources and loss of local resources)  Noise (impacts from airport noise)
 Transportation (impact from a hazardous design feature)  Utilities and Service Systems (relative to solid waste policies)  Wildfire (impacts from exacerbating wildfire spread, installation of fire breaks, expose people to post‐fire effects).

4.4 Findings for Environmental Effects Determined to be Less than Significant (No Mitigation Required)
For the following significance thresholds, the City finds that, based upon substantial evidence in the record, the Project would have less than significant impacts; therefore, no mitigation is required, and no significant, unavoidable adverse impacts would occur. Consistent with CEQA Guidelines Sections 15162.2 and 15128, the EIR focused its analysis on potentially significant impacts and limited discussion of other impacts for which it can be seen with certainty there is less than significant potential for significant adverse environmental effects.

CEQA Guidelines Section 15091 does not require specific findings to address environmental effects that an EIR identifies as “less than significant.” Supportive evidence for each of the following thresholds is discussed in the Draft EIR, Section 4 and also in the Initial Study.

4.4.1 Aesthetics
 The Project would not have a substantial adverse effect on a scenic vista.  The Project would not substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway.

Page 225 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 12 ends

 The Project is not located in a non‐urbanized area and therefore would not substantially degrade the existing visual character or quality of public views of the site and itssurroundings(Public views are those that are experienced from a publicly accessible vantage point). The project is in an urbanized area, and the Project is consistent with applicable zoning and other regulations governing scenic quality.
 The Project would not create a new source of substantial light or glare which would adversely affect day or nighttime views in the area.

Basis of Conclusion: The Project is located in an urban area along Huntington Drive in an area which is not considered a “scenic vista” or a state scenic highway but is a major tree‐lined parkway in the City of San Marino. The Crowell Library and Huntington School, which are adjacent to the SMC on the east and west, are both similar architectural styles of Spanish Mediterranean with stucco and wood accents that complement the mature trees within the landscape. The SMC, however, is clearly architecturally different than the adjacent buildings, therefore, there is a visible variation in the continuity of the aesthetically pleasing driving experience in the immediate area of the Project. The Project would be designed in a manner that would improve the SMC to a visually appealing building similar in architectural style to that of the adjacent buildings, retain the large trees in the front yard, including adding landscaping. Updates to exterior lighting are proposed, but which would not create a new source of substantial light or glare for day or nighttime views.

4.4.2 Air Quality
 The Project would not conflict with or obstruct implementation of the applicable air quality plan.  The Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non‐attainment under an applicable federal or state ambient air quality standard.
 The Project would not expose sensitive receptors to substantial pollutant concentrations.  The Project would not result in other emissions(such asthose leading to odors adversely affecting a substantial number of people.

Basis of Conclusion:  The Air Quality analysis in Appendix B of the 2022 Initial Study (located in Appendix F of the Draft EIR) modeled construction emissions for demolition (which primarily includes roof replacement, window removal and replacement, porch post replacement, and exterior stucco removal and replacement), building construction and architectural coating application based on the overall scope of the proposed Project and construction phasing which is expected to commence in fall/winter 2022 and extend through mid‐2023. The total area disturbed as a result of the Project would be limited to the building interior and exterior landscape and hardscape. For modeling purposes, it was assumed the Project would comply with SCAQMD Rules. The results of the modeling found that while construction activities that would occur during building upgrades the pollution thresholds set forth by the South Coast Air Quality Management District (SCAQMD) would not be exceeded during construction or operations.

Potential sources of odor during construction activities include equipment exhaust. The objectionable odors that may be produced during the construction process would occur periodically and end when construction is completed.

Page 226 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 13 ends

4.4.3 Energy
 The Project would not result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation.
 The Project would not substantially conflict with or obstruct a state or local plan for renewable energy or energy efficiency.

Basis for Conclusion: The 2022 Initial Study quantified energy usage during construction and operations.

It determined that the energy usage during construction would be temporary, and construction equipment used would be typical of similar‐sized construction projects in the region. In the interest of cost efficiency, construction contractors are not anticipated to utilize fuel in a manner that is wasteful or unnecessary. Therefore, Project construction would not result in a potential impact due to wasteful, inefficient, or unnecessary consumption of energy resources, and no construction‐related energy impact would occur. The Project upgrades include installation of energy efficient components, such as light fixtures and energy‐efficient heating and air conditioning, to reduce energy usage during operations.

4.4.4 Geology and Soils
 The Project would not, directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving: Alquist Priolo fault, seismic shaking, liquefaction, landslides.

Basisfor Conclusion:  The Project islocated in Southern California, a seismically active area and susceptible to the effects of seismic activity include rupture of earthquake faults. The Project is not located on or near a Alquist‐Priolo Earthquake fault, although the Raymond Fault Zone is documented approximately 0.5 mile to the north, in Lacy Park. All proposed improvements would comply with the latest seismic provisions of all applicable building codes designed to reduce impacts from earthquakes.

The City of San Marino’s Local Hazard Mitigation Plan identifiesthat the City is notsubject to liquefaction, and the surrounding area is flat, and there is no potential for landslides.

The Project does not require earth moving, except for shallow utility trenches, therefore, soil susceptible to erosion would not occur.

4.4.5 Greenhouse Gas
 The Project would not generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.
 The Project would not conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases.

Page 227 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 14 ends

Basis of Conclusion:

The 2022 Initial Study identified that the applicable plan for the proposed Project is the SCAQMD's Tier 3 thresholds which used Executive Order S‐3‐05 goal as the basis for deriving the screening level. Both construction and operational levels were identified to not exceed the SCAQMD 3,000 metric ton annual threshold.

4.4.6 Hazards and Hazardous Materials
 The Project would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials.  The Project is not located on a site which isincluded on a list of hazardous materialssites compiled pursuant to Government Code Section 65962.5; as a result, it would not create a significant hazard to the public or the environment.

Basis of Conclusion: Project construction would involve the use of construction‐related chemicals. These include but are not limited to hydraulic fluids, motor oil, grease, runoff, and other related fluids and lubricants. The construction activities would involve the disposal and recycling of materials, trash, and debris. The City’s Local Hazards Mitigation Plan addresses potential hazards in the City and identifies activities to reduce risks and damages associated with hazards, including disposal of hazardous materials due to human activities. The City must comply with federal, State, and local laws regarding potential hazardous materials impacts associated with construction of the Project. No hazardous wastes are anticipated to be utilized during operations of the SMC.

Based on the result of the database review, the Project Site has not been identified on a site listed in accordance with Section 65962.5 of the Government Code. The site islocated within the San Gabriel Valley Groundwater Basin. Portions of the San Gabriel Valley Groundwater Basin have been listed on the National Priority List (NPL), or Superfund Site, for volatile organic compound (VOC) impacted groundwater. These areas of impacted groundwater are referred to by the EPA as “Operable Units.” The Operable Units are contaminated with chlorinated solvents, namely trichloroethene (TCE) and tetrachloroethylene (PCE), which were historically used by the commercial and industrial facilities located in these areas. The Project Site is located near Area 3 Operable Unit, but not within any known groundwater plumes. In addition, and the Project Site is not listed on the EPA database as being a potentially responsible party. Based on this information, there is a low likelihood that elevated concentrations of VOCs are present in groundwater beneath the site or that the site has contributed to the regional groundwater issue.

4.4.7 Hydrology and Water Quality
 The Project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality.  The Project would not decrease groundwatersupplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin.

Page 228 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 15 ends

Basis of Conclusion:  The Project would improve and operate an existing building and does not involve grading that would impact surface waters. No changes or improvements are planned to the existing on‐ site stormwater flow or flow direction. Ground disturbance consists of limited, minor utility trenching, less than 1 acre, therefore, no Stormwater Pollution Prevention Plan is required to be prepared. Potable and non‐potable water usage is not anticipated to increase above historic existing levels after completion of the Project.

4.4.8 Noise
 The Project would not generate excessive or substantial groundborne vibration or groundborne noise levels.

Basis for Conclusion: Ground‐borne vibration levels in excess of 94 Vibration Velocity Level (VdB) would damage buildings extremely susceptible to vibration damage. The SMC building is included on the California Register of Historic Places and eligible for inclusion in the National Register of Historic Places; and thus, may be susceptible to vibration damage. However, no construction activities with the potential to generate significant ground vibration above 94 VdB, would be required to complete the proposed improvements. Based on the analysis in the 2022 Initial Study, vibration levels would not reach or exceed levels required to cause any structural damage or related impacts to the SMC or adjacent Crowell Public Library. Additionally, vibration levels would be below the 72 VdB threshold required to be perceptible at neighboring residences.

4.4.9 Public Services
 The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection, Police protection, Schools, Recreation/Parks, Other public facilities.

Basis for Conclusion: The Proposed Project is located within 0.5 mile of City police and fire services. No expansion of emergency services is anticipated because the Project is a remodel of an existing building.

And though one of the goals and objectives of the Project is to increase the usage of the SMC through providing a more modern facility, the amount of increase of water and wastewater is not significant because the increased use will be temporary and intermittent.

With respect to schools, the Proposed Project would not increase population growth, therefore, there is no need for additional schools. However, due to a shared parking arrangement, the Project could result in a potential for parking conflicts when the SMC, Library and School have highly‐attended concurrent events, which resulted in the implementation of mitigation measures. A further discussion of this issue as it relates to schools is provided in Section 4.5.6 of this document.

Page 229 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 16 ends

4.4.10 Recreation
 The Project would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated.
 The Project will occur within an existing City recreational facility, but the Project does not involve the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.

Basis of Conclusion: The Project does not propose any residential use or other land use that may generate a population that would increase the use of existing neighborhood and regional parks, or other recreational facilities, including the SMC. The Project will improve an existing community center and will not expand the SMC or construct new recreational facilities.

4.4.11 Transportation
 The Project would not substantially conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.  The Project would not substantially conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b).
 The Project would not result in substantial inadequate emergency access.

Basis of Conclusion: The guiding program, plan, ordinance or policy for this Project is the City’s Circulation Element within the City’s General Plan. The purpose of the Project is to enhance the SMC building to allow it to be more usable and accessible to City residents and to provide an office for the City recreation staff.

The SMC is currently utilized as a community recreation center and meeting center, and the Chamber of Commerce currently rents a portion of the SMC for its office. The Project may incrementally add participants to existing City recreation programs at the SMC as well as large events. The Project’s traffic impact analysis contained in the Draft EIR assessed scenarios where additional large events would be held to ensure that the analysis evaluated the worst‐case scenario. The Draft EIR analysis identified that the potential increase in patrons would not conflict with the City’s General Plan policies addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.

Consistent with the requirements of CEQA Guidelines Section 15064.3, the City of San Marino has adopted significance criteria for transportation impacts based on vehicle miles traveled (VMT) for land use development projects. The Proposed Project meets the criteria to be screened out of VMT analysis as it will serve the local population, is considered a community institution, and the SMC location falls within a mapped zone with low VMT area, thereby shortening travel distances and reducing VMT. As part of the NOP process, the City received a comment letter from Caltrans regarding the TIS provided in the 2022 Initial Study and NOP (DEIR, Appendix A). Specifically, Caltrans agreed that the Project meets the criteria to be screened out of VMT analysis as it will serve the local population and is considered a community institution, thereby shortening travel distances and reducing VMT.

Page 230 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 17 ends

The Proposed Project is required to comply with the City’s development review process including review by the City Fire Department for compliance with all applicable fire code requirements for construction and access to the site. The access and circulation features within the site would accommodate emergency ingress and egress by fire trucks, police units, and ambulance/paramedic vehicles. Emergency vehicles would enter the Projectsite using the driveway entrance on Huntington Drive, or alternatively West Drive.

The internal circulation includes ample area that can accommodate fire trucks. The driveway paving and design as well as the final design plans for the Project site’s ingress and egress will be reviewed by the City Engineer for appropriate width and lanes. All internal access lanes will meet City requirements pursuant to the Uniform Building and Fire Code to ensure adequate emergency access throughout the Project site.

4.4.12 Utilities and Service Systems
 The Project would not require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects.
 The Project hassufficient watersupplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years  The Project would not result in a determination by the wastewater treatment provider which serves or may serve the project that it does not have adequate capacity to serve the project's projected demand in addition to the provider's existing commitments.  The Project would not generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals.

Basis of Conclusion: The SMC is served by all existing utilities. Minor modifications of the utilities planned as part of the Project include replacing the overhead electrical service with an underground electrical service, including a minor electrical upgrade to today’s standards, and a new landscaping water service and meter to replace the existing irrigation lines. Additional water lines will be run to service the new fire sprinkler system.  These upgrades are minor modifications and do not represent a significant increase over the service capacity that is currently provided.

Usage of water, wastewater and landfill services may slightly exceed current demand with the anticipated increase in usage and recreational staff offices, however, utility providers are anticipated to have adequate supply to serve this minor incremental demand.

4.4.13 Wildfire
 The Project would not substantially impair an adopted emergency response plan or emergency evacuation plan.

Basis of Conclusion:  Depending on the nature of the emergency requiring evacuation, it is anticipated that the majority of the Project area users would exit the Project area via the existing roadway circulation system. Project implementation would not impair access to these roadways should an evacuation be

Page 231 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 18 ends

required. The San Marino Police Department, California Highway Patrol, and other cooperating law enforcement agencies have primary responsibility for evacuations, and the SMC may be used as an evacuation center if needed. The Project would not interfere with the ability of the SMC to be used as an evacuation center, except when the SMC is under construction, which is temporary, and other facilities are available should the SMC not be available.

4.5 Findings For Environmental Effects Mitigated to Less Than Significant The following summary describes impacts of the Project that, without mitigation, would result in significant adverse impacts. Upon implementation of the mitigation measures provided in the EIR, these impacts would be reduced to a less than significant level.

4.5.1 Biological Resources
Impact 4.4 IV.a The Project could have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service.

Support for this environmental impact discussion is included in Section 4.4 of the Draft EIR, specifically page 29 and in Section 4.4.4 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: Based on the literature review and field survey, implementation of the Project will have no significant impacts on federally, State, or localspecies known to occur in the general vicinity of the Project site because the Project exists in an urbanized area, and no sensitive species were determined to exist on‐ site, nor are any expected to exist on‐site. However, the Project site has the potential to support suitable habitat for foraging and nesting birds, which are protected by the Migratory Bird Treaty Act and the Fish and Game Code. The loss of individuals would result in a potentially significant impact.

Mitigation Measure: Based on the analysis presented in Section 4.4 Biological Resources in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.

BIO‐1: If construction occurs between February 1st and August 31st, a pre‐construction clearance survey for nesting birds should be conducted within three (3) days of the start of any vegetation removal or ground disturbing activities to ensure that no nesting birds will be disturbed during construction. The biologist conducting the clearance survey should document a negative survey with a brief letter report indicating that no impacts to active avian nests will occur. If an active avian nest is discovered during the pre‐construction clearance survey, construction activities should stay outside of a no‐disturbance buffer. The size of the no‐disturbance buffer will be determined by the wildlife biologist and will depend on the level of noise and/or surrounding anthropogenic disturbances, line of sight between the nest and the construction activity, type and duration of construction activity, ambient noise, species habituation, and topographical barriers. These factors will be evaluated on a case‐by‐case basis when developing buffer distances. Limits of construction to avoid an active nest will be established in the field with flagging, fencing, or other appropriate

Page 232 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 19 ends

barriers; and construction personnel will be instructed on the sensitivity of nest areas. A biological monitor should be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure that nesting behavior is not adversely affected by the construction activity. Once the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions, construction activities within the buffer area can resume.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measure above. The City of San Marino hereby finds that implementation of the mitigation measure is feasible, and the measure is therefore adopted.

Impact 4.4 IV.e The Project could conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.

Support for this environmental impact discussion is included in Section 4.4 of the Draft EIR, specifically page 29 and in Section 4.4.4 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: Of the trees on the Project site, five trees (four coast live oak and one western sycamore) are the size and type that qualify as heritage trees per City ordinance. The Project does not propose the removal of these trees. However, some improvements may require minimal excavation or work near the roots of the trees, which if performed improperly, could damage the tree health.

Mitigation Measure: Based on the analysis presented in Section 4.4 Biological Resources in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.

BIO‐2: Prior to construction, a certified arboristshall be retained to flag treesthat will be avoided and observe excavation activities that are planned within the root zone of the protected trees and assist the contractor in conducting excavation in a manner that will not impact the tree roots.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measure above. The City of San Marino hereby finds that implementation of the mitigation measure is feasible, and the measure is therefore adopted.

4.5.2 Cultural Resources
Impact 4.5 V.b The Project could cause a substantial adverse change in the significance of an archaeological resource pursuant to 15064.5.

Support for this environmental impact discussion is included in Section 4.5 of the Draft EIR, specifically page 29 and in Section 4.5.4 of the Initial Study incorporated in Appendix F of the Draft EIR.

Page 233 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 20 ends

Discussion: Archaeological sites represent the material remains of human occupation and activity either prior to European settlement (prehistoric sites) or after the arrival of Europeans (historicalsites). The SMC and its environs were developed between 1918 and 1950/51 on a portion of land originally known as the Cooper Ranch property, which was used for orange and pear groves. There are no known archaeological sites to be within or underlying the built environment of the Project site. The Project will involve excavation in limited areas to depths up to 3 feet for the purpose of installing, repairing, and upgrading utilities and various foundations. Given the disturbed nature of the site, it is unlikely that subsurface archaeological resources will be uncovered. However, subsurface resources could exist given the historic nature of the Project location.

Mitigation Measure: Based on the analysis presented in Section 4.5 Cultural Resources in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.

CUL‐1:  Provision for Unanticipated Cultural/Archaeological Buried Resources: In the event that cultural resources are discovered during Project activities, all work in the immediate vicinity of the find (within a 60‐foot buffer) shall cease, and a qualified cultural/archaeologist specialist meeting Secretary of Interior standards shall be hired to assess the find. If human remains or funerary objects are encountered during any activities associated with the Project, work in the immediate vicinity (within a 100‐foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the Project. Work on the other portions of the Project outside of the buffered area may continue during this assessment period. Salvage operation requirements pursuant to Section 15064.5 of the CEQA Guidelines shall be followed, and the treatment of discovered Native American remains shall comply with State codes and regulations of the Native American Heritage Commission (NAHC). Any significant archaeological resources found shall be preserved as determined necessary by the Project archaeologist and offered to a qualified repository for curation. Any resulting reports will be submitted to the South Central Coastal Information Center.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measure above. The City of San Marino hereby finds that implementation of the mitigation measure is feasible, and the measure is therefore adopted.

4.5.3 Geology and Soils
Impact 4.7 VII.f The Project could directly or indirectly destroy a unique paleontological resource or site or unique geologic feature.

Support for this environmental impact discussion is included in Section 4.5 of the Draft EIR, specifically page 30 and in Section 4.7.3 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: The SMC and its environs were developed between 1918 and 1950/51. There are no known paleontological sites to be within or underlying the built environment of the Project site. The Project will

Page 234 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 21 ends

involve excavation in limited areas to depths up to 3 feet for the purpose of installing, repairing, and upgrading utilities and various foundations. Given the disturbed nature of the site, it is unlikely that subsurface paleontological resources will be uncovered. However, subsurface resources could exist given the historic nature of the Project location.

Mitigation Measure: Based on the analysis presented in Section 4.7 Geology and Soils in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. The Mitigation Measure is the same measure as identified for archaeological resources above as the measure identifies procedures for unanticipated resource discovery. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.

CUL‐1:  Provision for Unanticipated Cultural/Archaeological Buried Resources: In the event that cultural resources are discovered during Project activities, all work in the immediate vicinity of the find (within a 60‐foot buffer) shall cease, and a qualified cultural/archaeologist specialist meeting Secretary of Interior standards shall be hired to assess the find. If human remains or funerary objects are encountered during any activities associated with the Project, work in the immediate vicinity (within a 100‐foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the Project. Work on the other portions of the Project outside of the buffered area may continue during this assessment period. Salvage operation requirements pursuant to Section 15064.5 of the CEQA Guidelines shall be followed, and the treatment of discovered Native American remains shall comply with State codes and regulations of the Native American Heritage Commission (NAHC). Any significant archaeological resources found shall be preserved as determined necessary by the Project archaeologist and offered to a qualified repository for curation. Any resulting reports will be submitted to the South Central Coastal Information Center.

Finding:  Changes or alterations have been required in, or incorporated into the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measure above. The City of San Marino hereby finds that implementation of the mitigation measure is feasible, and the measure is therefore adopted.

4.5.4 Hazards and Hazardous Materials
Impact 4.9 IX.b The Project could create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment.

Impact 4.9 IX.c   The Project could emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one‐quarter mile of an existing or proposed school.

Impact 4.9 IX.f The Project could impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan.

Support for this environmental impact discussion is included in Section 4.9 of the Draft EIR, specifically page 32 and in Section 4.9.3 of the Initial Study incorporated in Appendix F of the Draft EIR.

Page 235 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 22 ends

Discussion:

Impact 4.9 IX.b: The Proposed Project involves asbestos removal, and the City and the contractor is required to comply with regulations that include but are not limited to, and which are outlined in the “Comprehensive Hazardous Materials Survey Report” (on file with the City of San Marino). However, due to the age of the building there is the potential for hazardous materials to be discovered during construction that was not specifically identified in the hazardous materials survey.

Impact 4.9 IX.c: The Proposed Project is adjacent to the Huntington Middle School. And while the contractors will be handling all equipment and materials in accordance with State, federal and local regulations which will minimize potential emissions, there is the potential to emit hazardous emissions.

Impact 4.9 IX.f: During Project operations, SMC patrons would be utilizing the parking spaces within the shared parking lot. In the event the school needed to utilize the entire parking lot for an evacuation or evacuation staging, or conversely, the SMC patrons needed to utilize the parking lot for an evacuation of the SMC, both school personnel and SMC patrons may be required to relocate their vehicles and/or coordinate emergency personnel and resources.

Mitigation Measures: Based on the analysis presented in Section 4.9 Hazards and Hazardous Materials in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.

HAZ‐1:  Unanticipated Encounters With Hazardous Waste:   Following the abatement of hazardous materials by contractors licensed to remove said materials, should materials similar to those identified in “Comprehensive Hazardous Materials Survey Report” (Vista, November 2021), or if other forms of suspect hazardous materials are discovered during the remaining work activities, maintenance personnel and/or contractors must immediately cease work activities which may initiate an exposure episode, and notify the City Public Works Department manager. All such materials should be assumed to be hazardous and handled accordingly until properly tested and assessed.

HAZ‐2:  Construction Safety and Evacuation Plan:  Prior to the start of Project construction, the City shall designate construction equipment and materials safety and staging areas for the City employees and contractors to follow during construction. The staging area plan shall be prepared collaboratively with and/or approved by the San Marino Unified School District and Huntington School personnel. Additional items to be addressed in the plan shall include but not be limited to safety barrier locations, identifying a clear walking path forstudents, posting hazard signs, and identifying a construction communication protocol between City and School staff.

Additionally, the plan shall address the evacuation protocol for the school, and procedures that the City and contractor must adhere to in the event of a school evacuation during SMC construction.

Page 236 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 23 ends

HAZ‐3:  Shared Evacuation Plan – Operations. The City shall work with the San Marino Unified School District and Huntington School to create an evacuation plan that addresses procedures if an emergency occurs that effects both facilities, as well as emergency communication protocols when an emergency would impact the parking lot for both facilities.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measures above. The City of San Marino hereby finds that implementation of the mitigation measures are feasible, and the measures are therefore adopted.

4.5.5 Noise
Impact 4.13 XIII.a The Project could cause a generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project site in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.

Support for this environmental impact discussion is included in Section 4.13 of the Draft EIR, specifically page 34 and in Section 4.13.2 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: Noise sensitive uses near the Project site include the Crowell Public Library which is located adjacent to and northeast of the San Marino Center. Existing school buildings and single‐family residences are located 200‐300 feet west, south and east of the site, where noise levels could reach 68 decibels (dB).

Actual noise levels will fluctuate throughout the day and may periodically exceed 95 dBA at the property line depending on the location of jackhammer use used and whether multiple pieces of equipment are operating simultaneously in the same area.

Because the Project is located within a Residential (R)‐1 zone, Section 14.04.07 of the San Marino Municipal Code requires that equipment operation or outside construction and repair must not exceed 65 dB when originating from any parcel in an R‐1 Zone without a permit from the planning and building director. Therefore, because the Project may exceed 65 dB at the property line, the Project would require a permit from the planning and building director per the City’s code.

Mitigation Measure: Based on the analysis presented in Section 4.13 Noise in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measure is feasible and is made binding through the MMRP. The Mitigation Measure was designed for use by the City as the Project applicant because the City is also the authority that would issue a permit under Section 14.04.07 of the San Marino Municipal Code; essentially, the City issuing a permit to itself is not feasible. Imposition of this mitigation measure will reduce potentially significant impacts to less than significant.

NOI‐1 The City will place the following noise‐reducing best management practices on the Project construction plans:
 Construction Equipment Controls:  require the contractor to utilize electric powered equipment as much as possible, heavy equipment should have proper mufflers

Page 237 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 24 ends

installed, and locating any generators or compressors as far from the sensitive receptors as possible.
 Limit Operations Adjacent to Receivers: Limit the number of large pieces of equipment (i.e., bulldozers or concrete mixers) operating adjacent to receiversto one at any given time.
 Neighbor Notification. Provide notification to residential occupants nearest to the Project site at least 24 hours prior to initiation of construction activities that could result in substantial noise levels at outdoor or indoor living areas. This notification should include the anticipated hours and duration of construction and a description of noise reduction measures being implemented at the Project site. The notification should include a telephone number for local residents to call to submit complaints associated with construction noise. The notification should be posted along Huntington Drive and be visible from adjacent properties.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measure above. The City of San Marino hereby finds that implementation of the mitigation measure is feasible, and the measure is therefore adopted.

4.5.6 Public Services (Schools)
Impact 5.3 XV.a The Project could substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Schools.

Support for this environmental impact discussion is included in Section 5.3 of the Draft EIR, specifically page 58 and in Section 4.15.2 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: Parking for the SMC is provided in 48 of the 209 existing parking spaces located on the south side of the building, within the parking lot of Huntington Middle School, through a cooperative agreement with the SMUSD for use of the 48 spaces for both the SMC and as overflow parking for the Crowell Public Library. The shared parking arrangement with the SMUSD appears to be a traditional feature of the SMC and the Library, as historical articles in the Los Angeles Times indicate that the San Marino Women’s Club used the “school parking area” for club parking and for community events. A formal shared parking agreement between the City and the SMUSD was initiated in 2006 after the City purchased the building, and the agreement was renewed in 2019 for a 10‐year term (refer to Appendix A in the 2022 Initial Study, located in Appendix F of the Draft EIR).

Because the SMC and the Huntington School share a parking lot, with the SMC having designated spaces, a parking study for the Proposed Project was conducted to ensure the Project would not impact the school’s ability to service its programs to the extent that the school would need to construct another parking lot for its use. The parking study was conducted as part of the Project’s Transportation Impact Study, (herein referred to as “TIS”) for the 2022 Initial Study (refer to Appendix E of the 2022 Initial Study,

Page 238 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 25 ends

located in Appendix F of the Draft EIR), and updated in February 2022 in response to requests received during the NOP process for additional analysis as it related to SMC programs and special events that could interfere with school drop‐off/pickup and parking availability during concurrent large events between the SMC, the Crowell Public Library and the Huntington School. Additionally, the Huntington School completed construction of the Barth Athletics Center (BAC) in late 2019/2020, at the same time the COVID‐19 pandemic forced the temporary closure of public schools. The BAC is open to community user groups for non‐school sponsored activities, just as the former gym and facilities were open to community groups for non‐school sponsored activities. However, because the BAC was not fully operational prior to the COVID‐19 pandemic school shutdown, there was no data available as to if the BAC would be utilized for additionalschool events, and therefore, generate the need for additional parking forthe school events.

The parking study in the TIS evaluated the school’s typical calendar, pick‐up and drop‐off times, as well as evaluated the potential SMC event calendar as identified in Table 3‐1 of the DEIR. The school calendar information obtained from the SMUSD staff was for the school years 2018‐2019, 2019‐2020, and through Spring 2021 and included an estimate of the number of potential attendees for each of the events identified on the calendar. Interviews with District staff identified that the BAC was designed to replace outdated, undersized gym facilities and was not designed to increase the number of services or athletic teams or events (Draft EIR, p. 58).

The analysis concluded that the shared parking demand would create a surplus of 9 to 11 parking spaces during peak weekday and weekend conditions, respectively, assuming that the existing 17 on‐street spaces along Huntington Drive and West Drive along the library frontages are also available for shared use. Therefore, the Project would not create an additional demand for parking under anticipated general operations.

However, the TIS (DEIR, Appendix D) identified that while the number ofspacesis adequate under general conditions, the allocation of 48 spaces for SMC may not be sufficient if the SMC, Crowell Public Library and the Huntington Middle School held large‐scale events at the same time (such as a wedding or conference at the SMC at the same time as a major athletic event at the school). As such, mitigation measures were identified in the Draft EIR to ensure coordination between the City and the Huntington Middle School to reduce the potential for a significant demand for concurrent parking during highly attended concurrent events, which may interfere with the school’s ability to provide services and programs, thereby necessitating the school to consider constructing additional facilities, such as another parking lot.

Mitigation Measures: Based on the analysis presented in Section 5.3 Public Services ‐ Schools in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.

PS‐1   Shared Event Calendar. The City shall work with the Huntington Middle School to maintain joint events calendar that is accessible and shared between the City (for library and SMC events) and the Huntington Middle School which would include the date, time and duration of the event, including the expected attendance figure for each event. To the extent feasible, the City and the Library shall avoid scheduling classes/ meetings/events held at the SMC and the Crowell Public Library that begin or end such

Page 239 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 26 ends

that it overlaps with the morning drop‐off and afternoon pick‐up peak time periods at the Huntington Middle School.

PS‐2 Managed Parking Collaboration. Prior to the completion of Project construction, the City shall initiate collaborative discussions with the Huntington Middle School to develop a managed parking plan to be implemented whenever concurrent events are anticipated to exceed the total number of parking spaces available within the school parking lot.

Managed parking strategiesto be implemented in such circumstances include but are not limited to valet parking, tandem parking, dedicated ride share areas and special event parking permit requirements.

PS‐3 Additional Parking Study for Huntington Drive. The City shall study the installation of additional parking spaces along the south side of Huntington Drive along the SMC frontage and implement as feasible.

PS‐4 Encourage Alternative Transportation. The City shall encourage users and employees of the SMC and Crowell Public Library to utilize alternative modes of transportation including but not limited to: bicycle, transit, ride‐share, and other ride service opportunities to events where appropriate. Implementation of this method includes but is not limited to public awareness in the form of a statement on the City’s website, a statement on recreational class schedules, and a statement in contracts for private events.

PS‐5 Conduct Future Parking Study. The City shall conduct a parking utilization monitoring study one year from issuance of the Project’s Certificate of Occupancy. The parking utilization monitoring study must assess whether on‐site parking is adequate to meet Project demand during both weekday and weekend conditions, as well as the effectiveness of measures PS‐1 and PS‐2. If the study shows that Project parking demand exceeds the supply of parking within the Project, the study shall identify additional available parking reduction strategies, and the City shall select and implement measures to reduce or otherwise address parking demand, subject to review and approval by the Director of Public Works. The additional parking reduction strategies may include but are not limited to: 1) preparation of a Valet Parking Plan, 2) provision of shuttles from off‐site locations for high‐attendance events; 3) provision of transit passes and/or ride‐share subsidiesfor employees, and/or 4)subsidized off‐site parking optionsin order to minimize on‐site employee parking demand.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measures above. The City of San Marino hereby finds that implementation of the mitigation measures is feasible, and the measures are therefore adopted.

Page 240 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 27 ends

4.5.7 Tribal Cultural Resources
Impact 4.18 XVIII.a The Project could cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k).

Impact 4.18 XVIII.b The Project could cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Support for this environmental impact discussion is included in Section 4.18 of the Draft EIR, specifically page 37 and in Section 4.18.2 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: A Native American Heritage Commission (NAHC) search of its Sacred Lands and a tribal consultation were completed as part of the 2022 Initial Study. The NAHC responded stating that the search of its Sacred Lands File revealed positive results and to contact the Gabrieleno Band of Mission Indians – Kizh Nation.

The City consulted with the Kizh Nation who identified that while there are no known resources on the Project site, there is high potential for buried resources due to the proximity of a nearby village.  The City then incorporated the mitigation measures proposed by the Kizh Nation.

Mitigation Measures: Based on the analysis presented in Section 4.18 Tribal Cultural Resources in the Draft EIR, which is incorporated herein by reference, the following Mitigation Measures are feasible and are made binding through the MMRP. Imposition of these mitigation measures will reduce potentially significant impacts to less than significant.

TCR‐1 Retain a Native American Monitor Prior to Commencement of Ground‐Disturbing Activities A. The project applicant, lead agency or construction contractor shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation. The monitor shall be retained prior to the commencement of any “ground‐ disturbing activity” for the subject project at all project locations. “Ground‐  disturbing activity” shall include, but is not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal, boring, grading, excavation, drilling, and trenching.

Page 241 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 28 ends

B. A copy of the executed monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground‐disturbing activity, or the issuance of any permit necessary to commence a ground‐disturbing activity.

C. The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground‐disturbing activities, the type of construction activities performed, locations of ground‐ disturbing activities, soil types, cultural‐related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered tribal cultural resources (TCRs), including but not limited to, Native American cultural and historical artifacts, remains, places ofsignificance, etc., , as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs will be provided to the project applicant/lead agency upon written request to the Tribe.

D.   On‐site tribal monitoring shall conclude upon the latter of the following (1) written confirmation to the Kizh from a designated point of contact for the project applicant/lead agency that all ground‐disturbing activities and phases that may involve ground‐disturbing activities on the project site or in connection with the project are complete; or (2) a determination and written notification by the Kizh to the project applicant/lead agency that no future, planned construction activity and/or development/construction phase at the project site possesses the potential to impact Kizh TCRs.

E. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the Kizh monitor and/or Kizh archaeologist.

The Kizh will recover and retain all discovered TCRs in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.

TCR‐2: Unanticipated Discovery of Human Remains and Associated Funerary Objects A. Native American human remains are defined in Public Resources Code Section 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute.

B. If Native American human remains and/or grave goods are discovered or recognized on the project site, then all construction activities shall immediately cease. Health and Safety Code Section 7050.5 dictates that any discoveries of human skeletal material shall be immediately reported to the County Coroner and all ground‐disturbing activities shall immediately halt and shall remain halted until the coroner has determined the nature of the remains. If the coroner recognizesthe human remainsto be those of a Native American or has reason to believe they are Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission, and Public Resources Code Section 5097.98 shall be followed.

C. Human remains and grave/burial goods shall be treated alike per California Public Resources Code Section 5097.98(d)(1) and (2).

D. Construction activities may resume in other parts of the project site at a minimum of 200 feet away from discovered human remains and/or burial goods, if the Kizh monitor

Page 242 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 29 ends

determines in his/her sole discretion that resuming construction activities at that distance is acceptable and provides the project manager express consent of that determination (along with any other mitigation measures the Kizh monitor and/or archaeologist deems necessary). (CEQA Guidelines Section 15064.5(f).)
E. Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods. Any historic archaeological material that is not Native American in origin (non‐TCR) shall be curated at a public, non‐profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County or the Fowler Museum, if such an institution agrees to accept the material. If no institution accepts the archaeological material, it shall be offered to a local school or historical society in the area for educational purposes.

F. Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance.

TCR‐3: Procedures for Burials and Funerary Remains:

A. As the Most Likely Descendant (“MLD”), the Koo‐nas‐gna Burial Policy shall be implemented. To the Tribe, the term “human remains” encompasses more than human bones. In ancient as well as historic times, Tribal Traditions included, but were not limited to, the preparation of the soil for burial, the burial of funerary objects with the deceased, and the ceremonial burning of human remains.

B. If the discovery of human remains includes four or more burials, the discovery location shall be treated as a cemetery and a separate treatment plan shall be created.

C. The prepared soil and cremation soils are to be treated in the same manner as bone fragments that remain intact. Associated funerary objects are objects that, as part of the death rite or ceremony of a culture, are reasonably believed to have been placed with individual human remains either at the time of death or later; other items made exclusively for burial purposes or to contain human remains can also be considered as associated funerary objects. Cremations will either be removed in bulk or by means as necessary to ensure complete recovery of all sacred materials.

D. In the case where discovered human remains cannot be fully documented and recovered on the same day, the remains will be covered with muslin cloth and a steel plate that can be moved by heavy equipment placed over the excavation opening to protect the remains.

If this type of steel plate is not available, a 24‐hour guard should be posted outside of working hours. The Tribe will make every effort to recommend diverting the project and keeping the remains in situ and protected. If the project cannot be diverted, it may be determined that burials will be removed.

E. In the event preservation in place is not possible despite good faith efforts by the project applicant/developer and/or landowner, before ground‐disturbing activities may resume on the project site, the landowner shall arrange a designated site location within the footprint of the project for the respectful reburial of the human remains and/or ceremonial objects.

F. Each occurrence of human remains and associated funerary objects will be stored using opaque cloth bags. All human remains, funerary objects, sacred objects and objects of

Page 243 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 30 ends

cultural patrimony will be removed to a secure container on site if possible. These items should be retained and reburied within six months of recovery. The site of reburial/repatriation shall be on the project site but at a location agreed upon between the Tribe and the landowner at a site to be protected in perpetuity. There shall be no publicity regarding any cultural materials recovered.

G. The Tribe will work closely with the project’s qualified archaeologist to ensure that the excavation is treated carefully, ethically and respectfully. If data recovery is approved by the Tribe, documentation shall be prepared and shall include (at a minimum) detailed descriptive notes and sketches. All data recovery data recovery‐related forms of documentation shall be approved in advance by the Tribe. If any data recovery is performed, once complete, a final report shall be submitted to the Tribe and the NAHC.

The Tribe does NOT authorize any scientific study or the utilization of any invasive and/or destructive diagnostics on human remains.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of the mitigation measures above. The City of San Marino hereby finds that implementation of the mitigation measures is feasible, and the measures are therefore adopted.

4.6 Findings on Impacts Deemed Significant and Unavoidable in the Draft EIR The following summary describes the unavoidable impacts of the Proposed Project where mitigation measures were found to be infeasible or would not lessen impacts to less than significant levels.

This Significant and Unavoidable Impact was identified in the Project’s Initial Study (January 2022).

Therefore, the City developed Project Alternative 1  ‐  Preservation Alternative that assumes the preservation/rehabilitation of the SMC would be conducted in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995) and designed in consultation with a qualified historic preservation consultant that meets Secretary of the Interior’s Professional Qualification Standards in architecture, historic architecture, and architectural history.

The CEQA Guidelines Section 15126.4(b) addresses impacts to historical resources and mitigation alternatives as follows:
(1) Where maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of the historical resource will be conducted in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings (1995), Weeks and Grimmer, the project's impact on the historical resource shall generally be considered mitigated below a level of significance and thus is not significant.

With implementation of the Proposed Project following impacts would remain significant and unavoidable. As further discussed and demonstrated below, the following impacts would be reduced to Less Than Significant with the selection of Project Alternative 1  ‐  Preservation pursuant to CEQA Guidelines Section 15126.4(b).

Page 244 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 31 ends

4.6.1 Cultural Resources
Impact 5.1 V.a The Project would cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5.

Support for this environmental impact discussion is included in Section 5.1 of the Draft EIR, specifically page 40 and in Section 4.5 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: Public Resources Code Section 5020.1(q) defines “Substantial adverse change” as the demolition, destruction, relocation, or alteration such that the significance of an historical resource would be impaired.   CEQA Guidelines Section15064.5 (b)(1) and (b)(2) clarify that the impairment must be material and states that material impairment of a historical resource would occur when the Project “demolishes or materially alters in an adverse manner those physical characteristics of an historical resource that convey its historical significance and that justify its inclusion in, or eligibility for, inclusion in the California Register of Historical Resources.”
The SMC was formally listed in the California Register of Historical Resources (California Register) under Criterion 1, for association with an event important to the history of the San Marino community. The OHP identifies the SMC as being listed on the California Register through its listing on the State’s BERD. The SMC is also a City landmark pursuant to the San Marino City Code, Chapter XXIII, Article 18 Section

23.18.03 (A) “Automatic Designation.”
Because the SMC is eligible for listing to the National Register, islisted on the California Register of Historic Resources, and is therefore automatically considered a City landmark, CEQA Guidelines Section 15064.5(b)(3)states that a project that follows the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings or the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings (1995), Weeks and Grimmer (collectively referred to as “Secretary’s Standards”), “shall be considered as mitigated to a level of less than a significant impact on the historical resource.” The Secretary’s Standards are intended to pertain to rehabilitation projects in a reasonable manner, taking into consideration economic and technical feasibility.

The Project includes changing the exterior architectural design of the SMC building to aesthetically match the adjacent Crowell Public Library and Henry E. Huntington Middle School and San Marino Unified School District offices. For example, the existing wood shake roof would be replaced with tile, and the decorative wrought iron posts would be changed to stucco columns. The SMC will remain a community center, open for community events, club meetings, City recreation staff offices, and City recreation classes.

The Project does not qualify as a preservation or rehabilitation project as under the Secretary’s Standards as currently designed, according to the Cultural Resources evaluation in the DEIR (Appendix C). As identified in the DEIR Appendix C, the Proposed Project would materially alter a number of the physical characteristics of the SMC that convey its historical significance and that justify its inclusion in the California Register of Historical Resources.

Mitigation Measures: Based on the analysis presented in Section 5.1 Cultural Resources in the Draft EIR, which is incorporated herein by reference, Mitigation Measure CUL‐1 was identified in the 2022 Initial

Page 245 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 32 ends

Study to accommodate unanticipated archaeological and paleontological finds. Therefore, the following mitigation measures were included in the Draft and Final EIR and are appliable to the Proposed Project.

CUL‐2:  Documentation. Prior to the issuance of demolition or site permits, the project sponsors shall undertake Historic American Building Survey (HABS) documentation of the subject property, structures, objects, materials, and landscaping. The documentation shall be undertaken by a qualified professional who meets the standards for history, architectural history, or architecture (as appropriate), as set forth by the Secretary of the Interior’s Professional Qualification Standards (36 CFR, Part 61). The documentation shall consist of the following:
 Measured Drawings: A set of measured drawings that depict the existing size, scale, and dimension of the subject property. The Planning Department Preservation staff will accept the original architectural drawings or an as‐  built set of architectural drawings (plan, section, elevation, etc.). The Planning Department Preservation staff will assist the consultant in determining the appropriate level of measured drawings;  HABS‐Level Photography: Digital photographs of the interior and the exterior of subject property. Large format negatives are not required. The scope of the digital photographs shall be reviewed by Planning Department Preservation staff for concurrence, and all digital photography shall be conducted according to the latest National Park Service Standards. The photography shall be undertaken by a qualified professional with demonstrated experience in HABS photography; and  HABS Historical Report: A written historical narrative and report, per HABS Historical Report Guidelines.
 Video Documentation: Video footage of the exterior and interior of contributing elements of the subject property.

The professional shall prepare the documentation and submit it for review and approval by the Planning Department preservation staff prior to Project construction. The documentation shall be deposited to local historical repositories including but not limited to Pasadena Museum of History.

CUL‐3: Interpretation. The City shall provide a permanent display of interpretive materials within the SMC concerning the history and architectural features of the original SMC building and its relationship with the City of San Marino’s history. Interpretation of the site’s history and relationship with the City shall be supervised by an architectural historian or historian who meets the Secretary of the Interior’s Professional Qualification Standards and may engage additional consultants to develop the display. The interpretative materials (which may include, but are not limited to, a display of photographs, news articles, memorabilia, and/or video) shall be placed in a prominent setting within the SMC, such as the lobby or Fireside Room of improved building. A proposal describing the general parameters of the interpretive program shall be approved by the City of San Marino Community Development Department staff prior to occupancy.

Page 246 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 33 ends

CUL‐4: Salvage. Prepare an in‐depth salvage document for the character‐defining features of the SMC. The City shall work with a professional who meets the Secretary of Interior’s Standards to develop a salvage report that documents the building’s character‐defining features for conservation and assessesthe feasibility of reinstallation at the SMC or in other City facilities.

The salvage report shall include documentation of interior and exterior historic character‐ defining features that would not be retained by the Project. The professional shall prepare the salvage report and submit it for review and approval by the Community Development Department staff prior to the initiation of Project construction.

Nevertheless, the City of San Marino finds that there are no additional mitigation measures to the Proposed Project that are feasible, taking into consideration specific economic, legal, social, technological or other factors, that would mitigate this impact to a less‐than‐significant level,  Without more, approval of the Proposed Project would result in a significant and unavoidable impact even with mitigation measures CUL‐2, CUL‐3 and CUL‐4.

Asidentified in the Draft EIR, Project Alternative 1 ‐ Preservation represented lessthan significant impacts, therefore, the City has a feasible alternative to the Proposed Project that would reduce the project’s cultural resource impact to less than significant. (See CEQA Guidelines Section 15126.4(b) and Appendix C‐2 to the EIR.) Because the City desires to reduce all of the Project’s potential impacts to less than significant, and because Project Alternative 1  ‐  Preservation is feasible and avoids the significant and unavoidable cultural resource impact that would otherwise result from the Proposed Project, the City rejects the Proposed Project and accepts and approves Project Alternative 1 ‐ Preservation instead and directs that the Project Alternative 1 ‐ Preservation be implemented in lieu of the Proposed Project.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of Project Alternative 1  ‐ Preservation. The City of San Marino hereby finds that implementation of Project Alternative 1  ‐  Preservation is feasible, and the Project Alternative 1  ‐ Preservation is therefore adopted and is to be implemented in lieu of the Proposed Project.

4.6.2 Land Use and Planning
Impact 5.2 XI.b The Project would cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Support for this environmental impact discussion is included in Section 5.2 of the Draft EIR, specifically page 50 and in Section 4.11 of the Initial Study incorporated in Appendix F of the Draft EIR.

Discussion: The Project will not change the land use or use of the building as a public gathering space as it has existed for decades. Moreover, according to Section 23.02.01 of the San Marino Municipal Code, Recreational and childcare activities may be conducted by the City of San Marino on properties in residential zones that are owned by the City. Therefore, the Project is consistent with the City’s Land Use designation.

Page 247 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 34 ends

When the Project is evaluated against the City’s goals and objectives of its General Plan and Circulation Element, the Project is generally consistent with the City’s Vision Statement, identified in the following excerpt from the General Plan:

The city government embraces the values of the community, and recognizes the need to make our City more attractive, more desirable, and more responsive to the changing needs of its citizens.

Decision makers are accessible to residents. Although the City adapts to change in a deliberate way, its intent is to satisfy residents’ needs while protecting its financial resources.

The City of San Marino’s General Plan ‐ Land Use Chapter includes Section Three – Preservation, which identifies overarching guiding principals for its Goals, Policies and Implementation Measures which include “Preserve significant historic properties on the State Register and National Register.” As discussed in Section 5.1 of the DEIR, the SMC is considered a City Landmark. Chapter XXIII, Article 18 of the San Marino City Code, Section 23.18.03 (A) states: “Automatic Designation: Any property within the City that is listed in the National Register of Historic Places or the California Register of Historic Places is automatically designated as a historic landmark for purposes of this article.” The California OHP identifies the SMC as being listed on the California Register through its listing on the State’s BERD.

The City acquired the building in 2005 from the San Marino Women’s Club to use for City recreation programs. In January 2018, the City Recreation Commission began holding public discussions and extensive public outreach regarding re‐envisioning the City’srecreation program and enhancing the usage of the SMC. In 2018, the City Council adopted a strategic plan that identified developing a plan for the future of the SMC and appointed a “Blue Ribbon Committee” to evaluate the recreational programming.

Between August and September 2020, the City surveyed the community regarding the needs and aesthetic appearance of the SMC. One of the survey questions asked the community if the City should restore the original 1950s exterior architecture or remodel it to match other adjacent buildings. Of the 209 responses received, the results indicated:
 Restore 1950 's 79
 Match Crowell Library 95
 Match Barth Athletic Center 4
 Do something different   10
 No response 21
The result of the outreach was that nearly equal portions of the community supported retaining the existing design or supported a more modern look. Given that there was no clear community consensus, the City Council, after deliberations, determined that redesigning the SMC to more closely align with the architectural style of the Crowell Public Library would more closely align with the overall City’s vision as identified in the General Plan, “to make our City more attractive, more desirable, and more responsive to the changing needs of its citizens.” An architect wasretained to provide the current plans which represent the Proposed Project.

In sum, while the City did conduct extensive public outreach to receive input on how the historic San Marino Center should be remodeled, and the Proposed Project does align with the overall vision that came from those outreach efforts, the Proposed Project is not consistent with the Secretary’s Standards

Page 248 of 458 ends

San Marino Center Improvement Project
CEQA Findings of Fact ‐ City of San Marino

Page 35 ends

and therefore, conflicts with the City’s General Plan policy requiring the preservation ofsignificant historic properties.

The City of San Marino finds that there are no mitigation measures to the Proposed Project that are feasible, taking into consideration specific economic, legal, social, technological or other factors, that would mitigate thisimpact to a less‐than‐significant level. Without more, approval of the Proposed Project would result in a significant and unavoidable impact.

Asidentified in the Draft EIR, Project Alternative 1 ‐ Preservation represented lessthan significant impacts, therefore, the City has a feasible alternative to the Proposed Project that would reduce the project’s land use and planning impact to less than significant. (See CEQA Guidelines Section 15126.4(b) and Appendix C‐2 to the EIR.) Because the City desires to reduce all of the Project’s potential impacts to less than significant, and because Project Alternative 1  ‐  Preservation is feasible and avoids the significant and unavoidable land use and planning impact that would otherwise result from the Proposed Project, the City rejects the Proposed Project and accepts and approves Project Alternative 1 ‐ Preservation instead and directs that Project Alternative 1 ‐ Preservation be implemented in lieu of the Proposed Project.

Finding:  Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effect as identified in the Draft EIR. These changes are identified in the form of Project Alternative 1  ‐ Preservation. The City of San Marino hereby finds that implementation of Project Alternative 1  ‐  Preservation is feasible, and the Project Alternative 1  ‐ Preservation is therefore adopted and is to be implemented in lieu of the Proposed Project.

4.7 Findings on Project Alternatives
CEQA requires that the discussion of alternatives focus on alternatives to the project or its location that are capable of avoiding or substantially lessening significant effects of the Project.

The Draft EIR identified the Proposed Project as making both exterior and interior modifications to the San Marino Center (SMC), which is eligible for listing to the National Register of Historic Places, is on the California Register of Historical Resources, and which is a City Landmark under San Marino City Code, Chapter XXIII, Article 18 Section 23.18.03 (A). The exterior upgrades will change the existing architectural style of the building façade from “Modern Colonial Revival” to a “Spanish Mediterranean” architectural style which is similar to that of the adjacent Crowell Public Library to the east and the San Marino Unified School District buildings to the west. The Draft EIR determined significant and unavoidable impacts in the following environmental impact areas:
 Impact Section 5.1 ‐ Cultural Resources: Threshold V.a ‐ Cause a substantial adverse change in the significance of a historical resource as defined in 15064.5  Impact Section 5.2 ‐ Land Use and Planning: Threshold XI.b ‐ Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

The Draft EIR analyzed two alternatives to the Proposed Project that could avoid or substantially lessen the Project’s impacts.

Page 249 of 458 ends