CONTRACT
MA-080-25011708

BETWEEN

COUNTY OF ORANGE
AND
G2 CONSTRUCTION INC.

FOR

TRASH AND DEBRIS CAPTURE DEVICES
This Aggregate Contract MA-080-25011708 for Trash and Debris Capture Devices (Contract) is made and entered into as of the date fully executed by and between the County of Orange, a political subdivision of the State of California (“County”), and G2 Construction Inc., a California Corporation (Contractor), with County and Contractor sometimes referred to as Party or collectively as Parties.

ATTACHMENTS
This Contract is comprised of this document and the following Attachments, which are attached hereto and incorporated by reference into this Contract:

Attachment A – Scope of Work
Attachment B – Payment and Compensation

RECITALS
WHEREAS, Contractor and County are entering into this Contract for Trash and Debris Capture Devices under a usage Contract; and,
WHEREAS, County solicited Contract for Trash and Debris Capture Devices as set forth herein, and Contractor represented that it is qualified to provide Trash and Debris Capture Devices to the County as further set forth here; and,
WHEREAS, Contractor agrees to provide Trash and Debris Capture Devices to the County as further set forth in the Scope of Work, attached hereto as Attachment A; and, WHEREAS, County agrees to pay Contractor based on the schedule of fees set forth in Payment/Compensation, attached hereto as Attachment B; and, NOW, THEREFORE, the Parties mutually agree as follows:

ARTICLES

GENERAL TERMS AND CONDITIONS

1. Governing Law and Venue:

This Contract has been negotiated and executed in the state of California and shall be governed by and construed under the laws of the state of California. In the event of any legal action to enforce or interpret this Contract, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the parties hereto agree to and do hereby submit to the jurisdiction of such court, ,#1/(&++2%),-%




 

 


PAGE 268 of 623
4 CITY OF SAN MARINO
Targeted Catch Basins and Devices
Count
Catch
Basin # Street Name Nearest X-Street Lat Long
G2 BMP 1:

Full Capture
System
G2 BMP 2:

CurbOpening
Screen
ARS-CL™
Screens
1 1964141 HUNTINGTON DR DEL MAR AVE 34.12383 -118.10152 CPS-Mod™ Existing ARS 2 1964187 HUNTINGTON DR N. GRANADA AVE 34.11164 -118.12678 CPS-Mod™ Existing ARS 3 1964197 OLD MILL RD HUNTINGTON DR 34.11498 -118.12343 CPS-Mod™ Existing ARS 4 1964198 OLD MILL RD HUNTINGTON DR 34.11519 -118.12330 CPS-Mod™ Existing ARS 5 1964224 HUNTINGTON DR MONTEREY RD 34.12180 -118.10722 CPS-Mod™ Existing ARS 6 1964242 HUNTINGTON DR PASQUALITO 34.10812 -118.13263 CPS-Mod™ N/A- grate only 7 2017237 HUNTINGTON DR SAN GABRIEL BLVD 34.12713 -118.09150 CPS-Mod™ Existing ARS 8 2017238 HUNTINGTON DR WINSTON AVE 34.12422 -118.10042 CPS-Mod™ N/A- grate only 9 2017241 HUNTINGTON DR WINSTON AVE 34.12386 -118.10147 CPS-Mod™ Existing ARS 10 2017245 HUNTINGTON DR DEL MAR AVE 34.12355 -118.10137 CPS-Mod™ Existing ARS 11 1910305 MCFARLANE ST EUCLID AVE 34.11442 -118.13959 CPS-Mod™ ARS-CL™ 1 12 1910306 MCFARLANE ST EUCLID AVE 34.11459 -118.13959 CPS-Mod™ ARS-CL™ 1 13 1910308 MONTEREY RD GARFIELD AVE 34.11251 -118.13828 CPS-Mod™ ARS-CL™ 1 14 1963334 CANTERBURY RD LOMBARDY RD 34.13438 -118.10529 CPS-Mod™ Existing ARS 15 1963335 CANTERBURY RD LOMBARDY RD 34.13431 -118.10513 CPS-Mod™ Existing ARS 16 1963336 E. CALIFORNIA BLVD CANTERBURY RD 34.13594 -118.10602 CPS-Mod™ Existing ARS 17 1963337 E. CALIFORNIA BLVD CANTERBURY RD 34.13583 -118.10603 CPS-Mod™ Existing ARS 18 1963340 ORLANDO RD S. SIERRA BONITA RD 34.13269 -118.11649 CPS-Mod™ Existing ARS 19 1963341 ORLANDO RD AVONDALE RD 34.13191 -118.12011 CPS-Mod™ ARS-CL™ 4 20 1963342 ORLANDO RD CAMERON DR 34.13109 -118.12326 CPS-Mod™ Future target 21 1963343 AVONDALE RD ORLANDO RD 34.12940 -118.12005 CPS-Mod™ Existing ARS 22 1963344 AVONDALE RD ORLANDO RD 34.12932 -118.11995 CPS-Mod™ ARS-CL™ 2 23 1964004 KENSINGTON RD MONTEREY RD 34.12056 -118.11632 CPS-Mod™ Existing ARS 24 1964047 RAMIRO RD CARLARIS RD 34.11705 -118.13392 CPS-Mod™ ARS-CL™ 2 25 1964053 ALHAMBRA RD VIRGINIA RD 34.11464 -118.11510 CPS-Mod™ Existing ARS 26 1964088 N. ALHAMBRA RD DOMINGO DR 34.11335 -118.11555 CPS-Mod™ Future target 27 1964133 BRENTFORD RD SAN MARINO AVE 34.11494 -118.10221 CPS-Mod™ ARS-CL™ 2 28 1964145 CHARLTON RD MONTEREY RD 34.12014 -118.11779 CPS-Mod™ Existing ARS 29 1964159 ROSALIND RD VIRGINIA RD 34.12402 -118.12769 CPS-Mod™ Existing ARS 30 1964164 PARK PL VIRGINIA RD 34.12209 -118.12414 CPS-Mod™ ARS-CL™ 2 31 1964168 BANNING WAY STAATS PL 34.11726 -118.13244 CPS-Mod™ ARS-CL™ 1 32 1964173 WINTHROP RD PLYMOUTH RD 34.11399 -118.13101 CPS-Mod™ Existing ARS 5 PAGE 269 of 623

CITY OF SAN MARINO
Targeted Catch Basins and Devices
33 1964174 WILSON AVE N. GRANADA AVE 34.11320 -118.12972 CPS-Mod™ ARS-CL™ 2 34 1964178 PILGRAM PL LOS ROBLES AVE 34.10862 -118.13401 CPS-Mod™ ARS-CL™ 1 35 1964188 SUSSEX RD N. GRANADA AVE 34.11125 -118.12587 CPS-Mod™ Future target 36 1964189 ROANOKE RD CHELSEA RD 34.11098 -118.12489 existing CPS ARS-CL™ 2 37 1964191 OLD MILL RD MONTEREY RD 34.11734 -118.12607 CPS-Mod™ Existing ARS 38 1964191 OLD MILL RD MONTEREY RD 34.11778 -118.12569 CPS-Mod™ Existing ARS 39 1964193 OLD MILL RD MONTEREY RD 34.11720 -118.12583 CPS-Mod™ Existing ARS 40 1964194 OLD MILL RD MONTEREY RD 34.11725 -118.12576 CPS-Mod™ Existing ARS 41 1964209 LORAIN RD SHERWOOD RD 34.11013 -118.12020 CPS-Mod™ Existing ARS 42 1964209 LORAIN RD SHERWOOD RD 34.11012 -118.12026 CPS-Mod™ Existing ARS 43 1964210 ROXBURY RD S. OAK KNOLL AVE 34.10844 -118.12056 CPS-Mod™ ARS-CL™ 3 44 1964211 DARBY RD ROXBURY RD 34.10810 -118.12066 CPS-Mod™ Future target 45 1964212 S. OAK KNOLL AVE DARBY RD 34.10802 -118.11992 CPS-Mod™ ARS-CL™ 1 46 2016172 PALOMAR RD SHAKESPEARE DR 34.12978 -118.09388 CPS-Mod™ N/A 47 2016173 PALOMAR RD SHAKESPEARE DR 34.12975 -118.09370 CPS-Mod™ Existing ARS 48 2016379 S. SANTA ANITA AVE E. CALIFORNIA BLVD 34.13603 -118.09869 CPS-Mod™ Existing ARS 49 2017247 MELVILLE DR DEL MAR AVE 34.12103 -118.09904 CPS-Mod™ ARS-CL™ 1 50 2017250 SYCAMORE DR DEL MAR AVE 34.11744 -118.09834 CPS-Mod™ N/A sump 51 2017255 ROSE AVE SAN SALVATORE PL 34.11581 -118.09758 CPS-Mod™ Existing ARS 6 PAGE 270 of 623
City of San Marino
2025 PROJECT OVERVIEW MAP
7 PAGE 271 of 623
CPS-Mod™
Patented
CPS Modular Series
CA State Water Board Certified - FULL CAPTURE SYSTEM
_____________________________________________________________________________________________________________________________ G2 CPS-Mod™ Full-Capture 5mm perforated screens with
patented modular design for easy installation inside catch basins.

Approved by the California State Water Board, LACDPW, OCPW, OCTA, SF Bay RWQCB & agencies everywhere. The CPSMod™ prevents trash, pollutants, and debris from entering waterways through the catch basin outlet pipe.
• Made from 304 Stainless Steel for extended life.
• Sized to meet or exceed 1-year, 1-hour storm.
• Modular to easily fit all catch basin types.
• Custom designed and fabricated to each catch basin to ensure compliance of no gaps > 5mm in size.
• Professionally installed by G2 or a trained & certified installer. • Quick Release Removable (optional)
• Mosquito & Vector Abatement Deflector (where required) Recommended with G2’s ARS CamLock Series™
PAGE 272 of 623
8 CPS-Mod™
Patented
CPS Modular Series
FULL CAPTURE SYSTEM Certified by
California State Water Board & Regional Water Quality Control Boards G2 CPS-Mod™ Connector Pipe Screen
Function:
• Captures all pollutants 5mm and larger that enter the catch basin. • Pollutants prevented from exiting the catch basin:
➢ Primary: plastics (food containers, bags, bottles, straws); trash (paper, cigarette butts, cans); vegetative debris (leaves, branches, landscaping); other all other objects. ➢ Secondary: pollutants absorbed by or attached to the Primary pollutants. Including from vehicles (hydrocarbons, fluids, copper, cadmium, zinc, tires, etc.), pathogens / bacteria, pesticides, nutrients, organic compounds, sediment toxicity, etc.

Design, Flexibility, & Approval:
• Custom designed and fabricated for each catch basin and its unique features. • Fits any standard catch basin with discharge pipe on front, back, or side wall. • Approved by State Waterboard, Los Angeles County DPW, City of LA, Orange County DPW, OCTA, San Francisco Bay Area Water Resource Board, and agencies everywhere.

Material & Fabrication:
• Made of 304 stainless steel; 14 gauge with 5mm holes. • “Made in California, USA”
Value:
• Low initial capital investment relative to other storm water quality BMPs. Lower long-term and total lifetime costs vs. any water quality BMP or taking no action. • Requires no replacement filters or parts.
• G2’s CPS-Mod™ in combination with the G2’s ARS-CL™ creates the most effective BMP system and greatest value.

Public Outreach:
• Residents aware of the CPS-Mod™ installed in their local catch basin perceive it to be an environmental benefit and demonstrates an environmentally conscious community.

Recommended with G2’s ARS CamLock Series™ screens, for the most complete full capture system.

PAGE 273 of 623
9 CPS-Mod™
Patented
CPS Modular Series FULL CAPTURE SYSTEM
PAGE 274 of 623
10 NOTES: TOP DEFLECTOR, AS NEEDED SUPPORT BRACKET WHEN A 48". BOTTOM TRIM SIZED TO FIT, AS NEEDED, SEE SHEET #3. 2 G2 Construction, Inc. Sheet 1 of 6 Connector Pipe Screen (CPS) NOT TO SCALE A *Hb *Hs A* B* (typ) *Hs/2 (typ) *Hs/2 (typ) Full Capture Model: G2 CPS - Modular Patented VI A 5 mm Opening Screen 14 Gauge *L = A A 5 mm Opening Screen 14 Gauge *L = A+2B B (typ) A 5 mm Opening Screen 14 Gauge *L = A+B B 3 3 1 2 1 Screen made of 304 Stainless Steel 14 gauge, with 5 mm openings.

Manufactured and Installed Exclusively by:

Office (714) 748- 4242
CA Lic. # 801253 A, C-8, C-60
G2 Construction, Inc. [email protected] Santa Ana, CA 92705 1352 E. Borchard Avenue PAGE 275 of 623
11 ARS-CL™
Patented
ARS CamLock Series
___________________________________________________________________________________________ G2’s ARS-CL™ automatic retractable screen with CamLock
technology prevents trash and debris from entering catch basins through the curb opening. Approved by LACDPW,
OCTA, OCPW, SF Bay ABAG, and most agencies.

Approved for Trash Amendment TRACK 2 compliance.

Reduces catch basin cleaning costs and CPS maintenance.

Prevents up to 95% of trash and debris from entering the catch basin.
• Made from 304 Stainless Steel for extended life.
• Custom designed, fabricated & fitted to each curb
opening. “Made in California, USA”
• Independent ARS-CL™ devices open and lock between
all catch basin support bolts.
• Sized to meet or exceed 1-year, 1-hour storm*.
• Professionally installed by G2.

Recommended with G2’s CPS-Mod Series™
PAGE 276 of 623
12 ARS-CL™
Patented
ARS CamLock Series
_________________________________________________________________________________________ ARS-CL™ Automatic Retractable Screen
Function:
• Stops all pollutants ¾ inches and larger from entering catch basins and water systems. • Significantly reduces cleaning frequency for catch basins and CPS-Mod™ maintenance. • Pollutants prevented from entering the catch basin:
➢ Primary: plastics (food containers, bags, bottles); trash (paper, cigarette butts, cans); vegetative debris (leaves, branches, landscaping); other objects (balls, toys). ➢ Secondary: pollutants absorbed by or attached to the Primary pollutants. Including from vehicles (hydrocarbons, fluids, copper, cadmium, zinc, tires, etc.), pathogens / bacteria, pesticides, nutrients, organic compounds, sediment toxicity, etc.
• Automatically unlocks and opens during storm events to prevent street flooding. • Automatically re-locks in the closed position to prevent pollutant access. • Low maintenance. Prevents 85-95% of trash and debris from entering the catch basin.

Design, Flexibility, & Approval:
• Custom designed and fabricated for each catch basin’s curb opening. • Fits any standard curb-face catch basin opening.
• Approved by Los Angeles County DPW, City of LA, Orange County DPW, OCTA, San Francisco Bay Area Water Quality Board, Contra Costa County DPW, and Agencies nationally.

Material & Fabrication:
• 100% stainless steel device.
• Fabricated in Orange County. “Made in California, USA” Value:
• Significantly reduces catch basin cleaning requirements and costs. • Low initial capital investment relative to other storm water quality BMPs. Lower long-term and total lifetime costs vs. any water quality BMP or taking no action. • Requires no replacement filters or parts.
• Works in harmony with regular street sweeping programs.

Aesthetics & Environmentalism:
• Beautiful stainless steel devices add aesthetic value to streets and neighborhoods. • Residents perceive the ARS-CL™ to be an environmental benefit and demonstrates an environmentally conscious community.

Recommended with G2’s CPS-Mod Series™ screens, for the most complete full capture system.

PAGE 277 of 623
13 ARS-CL™
Patented
ARS CamLock Series
__________________________________________________________________________________________ PAGE 278 of 623
14 PAGE 279 of 623
15 VENDOR & INSTALLER CREDENTIALS
PAGE 280 of 623
16 CREDENTIALS & QUALIFICATIONS
Background & Experience
G2 Construction started operations in Los Angeles County in 2001 with strong foundations in welding, concrete construction, shop fabrication, and field work. The company began designing, fabricating, and installing catch basin curb opening automatic retractable screens (ARS) and full-capture connector pipe screens (CPS) and other stormwater protection devices for Los Angeles County Department of Public Works (LACDPW) and southern California municipalities in 2002.

Since then, G2 has fabricated and installed tens of thousands of approved catch basin inserts and screen covers on hundreds of stormwater projects in the Los Angeles and Orange County area. G2 offers complete solutions by performing project evaluation and consultation on stormwater devices and then designing, fabricating, and installing highly effective devices to meet and exceed specifications.

G2’s General Credentials
• Los Angeles County Dept. of Public Works & City of Los Angeles Bureau of Sanitation approved products: CPS-Mod™ & ARS-CL™
• Orange County Public Works (OCPW) and OCTA M2 Environmental Cleanup Program approved storm water quality devices:
o CPS-Mod™ patented Full Capture System approved by State Waterboard. o GITS™ grated inlet trash screen Full Capture System approved by State Waterboard.
o ARS-CL™ patented automatic retractable screen.
• OCPW ranks G2 Construction as their #1 stormwater device provider (2020 RFP & 2014 RFP). Awarded Master Purchase Agreements covering 2015 - 2025. • Association of Bay Area Governments (ABAG) Approved products (all) • California Contractor Licenses: A (General Contractor), C-8 (Concrete), C60 (Welding) • Disadvantaged Business Entity (DBE) certified. [see Attached] • Minority Business Entity (MBE) certified. [see Attached] • Small Business Entity (SBE) certified.

PAGE 281 of 623
17 G2’s Technical Expertise
G2 Construction is at the forefront of the stormwater device industry. G2 has designed and fabricated the most advanced stormwater protection devices to solve the needs of public agencies and private developers. Our advanced methodologies for fabrication and installation have made G2 the industry leader in providing custom-fitted stainless steel catch basin inserts and curb opening screen covers.

G2 has developed a high degree of technical expertise by incorporating all phases (evaluation, consulting, design, fabrication, installation, reporting) of stormwater projects, and learning from hundreds of installed projects over the years. We have become extremely familiar with all the procedures required for success.

Our depth of knowledge and technical experience has been the result of solving many dozens of challenges and constraints of projects over two decades. This includes, among many others, solving for all the various catch basin types and sizes and conditions that we face in the field.

We’ve learned something new from most projects and most clients. Our experiences with cities in Orange County and throughout southern California have been very good for many years.

Because many cities have developed an advanced knowledge of the industry and recognize quality and value, it makes G2’s work more effective, efficient, and valuable.

Fortunately, G2’s strong culture for project management helps us to organize projects effectively and manage diverse teams. This has enabled G2 to have a 100% rate of success for completing projects and within budget.

G2 provides its technical expertise and installation services throughout California and focuses on the Orange County and Los Angeles County regions.

Letters of Reference
G2’s customers provide additional insights into our qualifications. Attached are a few letters of our customer letters of recommendation.

PAGE 282 of 623
18 zero waste • zero wasted water

BOARD OF PUBLIC WORKS

MEMBERS

VAHID KHORSAND

PRESIDENT

JENNY CHAVEZ

VICE PRESIDENT

JOHN GRANT

PRESIDENT PRO TEMPORE
STEVE S. KANG

COMMISSIONER
FAITH I. MITCHELL

COMMISSIONER

ELYSE MATSON

EXECUTIVE OFFICER

CITY OF LOS ANGELES

CALIFORNIA

KAREN BASS
MAYOR

BUREAU OF SANITATION

BARBARA ROMERO

DIRECTOR AND GENERAL MANAGER
VACANT

CHIEF OPERATING OFFICER

SARAI BHAGA

CHIEF FINANCIAL OFFICER

JULIE ALLEN

NICOLE BERNSON

MAS DOJIRI
ALEXANDER E. HELOU

ROBERT POTTER

ASSISTANT DIRECTORS

HI SANG KIM

ACTING HYPERION EXECUTIVE PLANT MANAGER
–– 1149 SOUTH BROADWAY, 9TH FLOOR
LOS ANGELES, CA 90015
TEL: (213) 485-2210
WWW.LACITYSAN.ORG

AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER
Recyclable and made from recycled waste

February 4, 2025

ELECTRONIC MAIL
To Whom It May Concern:

LETTER OF RECOMMENDATION FOR G2 CONSTRUCTION, INC.

G2 Construction (G2) has designed, fabricated, and installed thousands of their trash capture devices in the City of Los Angeles since the bureau of Sanitation and Environment (LASAN) approved their CPS inserts and ARS curb opening screens in 2013. G2’s devices are very effective at capturing trash, their installations are of high quality, and the company is professional and reliable.

In 2023, LASAN awarded G2 Construction a 10-year $8,000,000 contract to fabricate and install Full Capture Catch Basin Inserts and Curb Opening Screen Covers (G2’s CPS-Mod and ARSCL devices). G2 is one of only two approved vendors that LASAN has found acceptable to provide both the catch basin connector pipe screens (CPS) and automatic retractable screens (ARS) in City of Los Angeles public right-of-way catch basins.

G2’s installation crews are highly skilled and communicate well with inspectors, their work is performed on time and within budget, and their project management has been efficient. Their personnel are very good at providing all required documentation and making the process easy.

The approval of G2 devices by LASAN lead to the installation of their CPS-Mod and ARS-CL devices on important City projects such as:

LA World Airports Roadways (LAWA RUE). 2024
LA Metro Westside Purple Line. 2024
LA Metro Regional Connector Corridor. 2023
LA Metro LAX Corridor Project. 2021
Port of Los Angeles. 2020
Hyperion Treatment Plant Screens. 2016
Branford Dry Well project. 2016
City of LA TMDLS – Machado Lake. 2015-16
LA Metro Exposition Rail Line. 2015
I-405 Widening Project. 2014
PAGE 283 of 623
19 Letter of Recommendation – G2 Construction
2/6/2025
Page No. 2
I am pleased to offer this letter of recommendation for G2 Construction. Based on our experience with G2 Construction, I can recommend their products and services.

Sincerely,

JONATHAN BALL
Assistant Division Manager
Watershed Protection Division
LA Sanitation and Environment
JJB/jb
c: Marsa Chan, LASAN
PAGE 284 of 623
20 21
PAGE 286 of 623
22 5050 N. Clark Avenue  Lakewood, California 90712  (562) 866-9771 February 6, 2025
Orange County Public Works
Procurement Services
601 North Ross Street
Santa Ana, CA 92701
SUBJECT: G2 Construction, Inc. – Letter of Recommendation To Whom It May Concern:

The City of Lakewood contracted with G2 Construction on three (3) projects to install State Water Board certified CPS-Mod connector pipe screens and GITS grated inlet trash screens.

G2 successfully installed their products in 2016, 2018, and 2023 as part of the City’s FullCapture Catch Basin Insert Program to the satisfaction of the City. G2’s personnel have been very capable, and both projects installed as scheduled.

Our experience with G2 has been very positive, and I can recommend their products and services. Their team has been very professional and responsive to our needs, and they were quick to provide field evaluations of our catch basins and recommendations for our project.

Some of the City’s catch basins were unique and G2 was able to manufacture customized CPSMod devices that allowed us to meet regulations and the City’s water quality objectives.

Please feel free to contact me if you have any additional questions.

Sincerely,
Ms. Konya Vivanti
Environmental Programs Manager
City of Lakewood
5050 Clark Avenue
Lakewood CA, 90712
(562) 866-9771 ext. 2507
[email protected]
PAGE 287 of 623
23 CITY OF LAGUNA HILLS
24035 El Toro Road •Laguna Hills, California 92653 • (949) 707-2600 • FAX (949) 707-2633 Website: www.LagunaHillsCA.gov
Feb. 3, 2025
Orange County Public Works
Procurement Services
601 North Ross Street
Santa Ana, CA 92701
SUBJECT: City of Laguna Hills – Letter of Recommendation for G2 Construction, Inc.

TRASH AND DEBRIS CAPTURE DEVICES – RFP# 080-2736403-WH
To Whom It May Concern:

The City of Laguna Hills has contracted with G2 Construction (G2) since 2007 to design, fabricate, and install their ARS-CL and CPS-Mod trash and debris screens throughout the City. Between 2012 - 2024, G2 installed 11 annual City projects that won OCTA Environmental Cleanup Program’s Project X grant funds. They have installed over 2,000 ARS screens and 370 CPS devices in our catch basins.

The City continues to select G2 Construction because their devices successfully prevent trash, debris, and vegetation from entering our storm drain system and watershed. The City plans to work with G2 again this year to install our Phase XII OCTA grant.

For each project G2 has provided a simple end-to-end solution that includes field evaluations and measurements of catch basins, custom design and fabrication of their devices, installation, photos, support documentation, and warranty. G2’s work has always been on schedule, on budget, and performed without any problems.

G2 has also assisted the City with an inventory of catch basin devices, and provided information critical to our Project X applications.

I am pleased to offer this letter of recommendation for G2 Construction. The City finds their trash and debris devices to be very effective and of good value, and their installation work to be of high quality. The company has been very professional and dependable in their interactions with the City. We look forward to working with G2 Construction on future projects.

You may contact me with any questions at [email protected] or 949/707-2655.

Sincerely,
Joe Ames, P.E., T.E.

Public Works Director/City Engineer
PAGE 288 of 623
24 City of Mission Viejo
Public Works Department
200 Civic Center • Mission Viejo, California 92691 949/470-3056 http://www.cityofmissionviejo.org
Bob Ruesch
Mayor
Wendy Bucknum
Mayor Pro Tem
Brian Goodell
Councilmember
Trish Kelley
Councilmember
Cynthia Vasquez
Councilmember
January 17, 2025
Subject: G2 Construction
To Whom It May Concern:

G2 Construction has consistently provided quality services for the City of Mission Viejo since 2014 when it first installed Trash and Debris Capture Devices in Mission Viejo’s catch basins.

Since then, the City has contracted with G2 every year to install more G2 devices and will again in 2025.

G2 provides the Full Capture System CPS devices and ARS curb-opening screens the City prefers to prevent pollutants and debris from entering its storm drain systems. G2 is a full-service entity providing everything from field evaluations to custom device design, device fabrication, and installation. G2 is also instrumental in assisting the City with grant funding applications and the preparation of grant reimbursement requests.

G2 Construction is professional, experienced, expedient and reliable. Work is always performed quickly and efficiently and within budget.

They are a pleasure to work with and the City looks forward to many more projects with G2 Construction.

Regards,

MARK CHAGNON
City Of Mission Viejo
Director Of Public Works
PAGE 289 of 623
25 CITY OF FULLERTON
_______________________________________________________________________________________________________________________________ Public Works Department – Engineering Division

THE EDUCATION COMMUNITY
303 West Commonwealth Avenue, Fullerton, California 92832-1775 (714) 738-6845 • www.cityoffullerton.com
November 7, 2024
RE: Orange County Transportation Authority Measure M2 Environmental Cleanup Tier 1 Grant Program Fiscal Year 2024-2025
City of Fullerton - Letter of Recommendation
The City of Fullerton (City) has worked with G2 Construction Inc (G2) on every Orange County Transportation Authority Measure M2 Environmental Cleanup Tier 1 Grant the City has applied to since 2014. As the City’s primary contractor for installing the full capture trash and debris devices, G2 has installed approximately 495 full capture trash and debris devices to date within the City.

Over the years, G2 has far exceeded the City’s expectation and proven to be professional and masters of their craft. With each project, G2 continues to provide great service including detailed field reviews, photos and supporting documentation, and continuous communication. Each project is completed on time and within budget.

Furthermore, I am impressed with the service G2 provides and I am pleased to recommend G2 Construction, Inc. The City is looking forward to working with G2 on next year’s Catch Basin Connector Pipe Screen Project.

Feel free reach out to me for any questions by phone 714-738-6886 or by email [email protected].

Sincerely,
Melissa Rendon, P.E.

Civil Engineer
City of Fullerton
Public Works Engineering Department
PAGE 290 of 623
26 Public Works 910 Calle Negocio San Clemente CA 92673 www.san-clemente.org
City of San Clemente
Engineering Division
Niki Beach, Environmental Programs Analyst
Phone: (949) 361-8354
[email protected]
February 13, 2025
Subject: Trash Capture Device Installations by G2 Construction To Whom It May Concern:

I wholeheartedly recommend G2 Construction, Inc. (G2) following the excellent service they provided in the City of San Clemente’s most recent 2024 contract with them for the installation of trash capture devices on 78 storm water inlets.

The G2 team demonstrated expertise in the products they sell and install, as well as a commitment to delivering projects under budget and on a schedule that minimized both traffic impacts to the public and City staff time. In addition to quality, customized products, G2 provided substantial technical assistance that they have incorporated into their contract pricing. As a project manager new to the world of trash capture devices, I especially appreciated the guidance of G2 in ensuring that the work they so efficiently completed would meet the requirements for the OCTA grant funding that we obtained for the project, and also drive us closer to regulatory compliance with the Statewide Trash Amendments.

To date, G2 has installed trash capture devices on 244 inlets within the City’s jurisdiction. Although I did not oversee the previous phases of trash capture devices, I can attest that the City has had no major maintenance or quality issues with the devices constructed and installed by G2 since they first began working under contract for the City in 2022.

If you have any additional questions about G2’s work for the City, please don’t hesitate to reach out to me.

Sincerely,
Niki Beach
Environmental Programs Analyst
PAGE 291 of 623
27 CITY HALL 211 EIGHTH STREET
SEAL BEACH, CALIFORNIA 90740
(562) 431-2527 • www.sealbeachca.gov
October 23, 2024
Orange County Public Works
Procurement Services
601 N. Ross Street
Santa Ana, CA 92701
SUBJECT: TRASH AND DEBRIS CAPTURE DEVICES – REQUEST FOR PROPOSAL City of Seal Beach – Recommendation Letter
To Whom It May Concern:

This letter of recommendation is in response to Orange County Public Works’ Trash and Debris Capture Devices RFP. In my current capacity as the City of Seal Beach’s Public Works Director, I have had the pleasure of working with G2 Construction, Inc. (G2) for the installation of multiple capture devices.

OCPW’s master agreement in partnership with OCTA’s Environmental Cleanup Program has allowed many local agencies mitigate transportation-related pollutants. Through this, G2 has provided a seamless approach to successful project delivery, which I have no reservations recommending. The following is a recent list of services performed under my purview:
 2023 Seal Beach CPS -Mod (170 systems) + ARS (48 screens)  2020 Seal Beach CPS-Mod (53 systems) + ARS (95 screens)  2019 Seal Beach CPS-Mod (55 systems) + ARS (127 screens) Should you have any questions regarding G2’s performance, please feel free to reach out at (562) 431- 2527, x1322 or [email protected].

Sincerely,
Iris Lee
Director of Public Works
PAGE 292 of 623
28 BfilNA@>PARK
DATE:

TO:

FROM:

SUBJECT:

January 30, 2025
Orange County Public Works
Joe Hunt, Senior Management Analyst
Reference for G2 Construction
Department of Public Works
The City of Buena Park has worked with G2 Construction since 2015 to install CPS, ARS, and GITS devices on storm drains throughout the City's public right-of-way. The City has maintained a good working relationship with G2 Construction during that time and our projects have been completed on time and at maximum value to the City. I can recommend G2 Construction for future projects with your or other organizations based on our experiences. We have completed 4 projects with G2 Construction, resulting in over 1,500 screens installed.

Hunt, Senior Management Analyst
[email protected]
6650 Beach Blvd
Buena Park, CA 90622
(714 )562-3685
PAGE 293 of 623
29 PAGE 294 of 623
30 PAGE 295 of 623
31 March 28, 2024 CUCP# 41740
Metro File #6371
MR. JOHN ALVARADO
G2 Construction, Inc.
1352 East Borchard Ave
Santa Ana, CA 92705-4413
Subject: Disadvantaged Business Enterprise Certification Dear MR. JOHN ALVARADO:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Disadvantaged Business Enterprise (DBE) as required under the U.S. Department of Transportation (U.S. DOT) Regulation 49 CFR Part 26, as amended. This certification will be recognized by all of the U.S. DOT recipients in California. Your firm will be listed in the California Unified Certification Program (CUCP) database of certified DBEs under the following specific area(s) of expertise that you have identified on the NAICS codes form of the application package:

NAICS 331491: NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM) ROLLING, DRAWING, AND EXTRUDING NAICS 237310: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
NAICS 332313: PLATE WORK MANUFACTURING
Your DBE certification applies only for the above code(s). You may review your firms information in the CUCP DBE database which can be accessed at the CUCP website at https://californiaucp.dbesystem.com. Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing DBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your DBE status remains current. If there are changes, Metro will review to determine continued DBE eligibility. Please note, your DBE status remains in effect unless Metro notifies you otherwise.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately. Failure to submit forms and/or change of information will be deemed a failure to cooperate under Section 26.109 of the Regulations.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your DBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records and documents by Metro.

Congratulations, and thank you for your interest in the DBE program. Should you have any questions, please contact us at (213) 922-2600. For information on Metro contracting opportunities, please visit our website at www.metro.net/connect.

Sincerely,
PAGE 296 of 623
32 Ramon Ortiz
Director, Certification & Economic Development
PAGE 297 of 623
33 March 28, 2024 Metro File #6371
MR. JOHN ALVARADO
G2 Construction, Inc.
1352 East Borchard Ave
Santa Ana, CA 92705-4413
Subject: Small Business Enterprise Certification
Dear MR. JOHN ALVARADO:

We are pleased to advise you that after careful review of your application and supporting documentation, the Los Angeles County Metropolitan Transportation Authority (Metro) has determined that your firm meets the eligibility standards to be certified as a Small Business Enterprise (SBE) as required under Metro's SBE Program. Your firm will be listed in Metro's SBE database of certified SBEs under the following specific areas of expertise:

NAICS 331491: NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM) ROLLING, DRAWING, AND EXTRUDING NAICS 237310: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
NAICS 332313: PLATE WORK MANUFACTURING
Your SBE certification is valid for five years from the date of this letter and applies only for the above NAICS code(s). Any additions and revisions must be submitted to Metro for review and approval.

In order to ensure your continuing SBE status, you are required to submit an annual update along with supporting documentation. If no changes are noted, then your SBE status remains current. If there are changes, Metro will review to determine continued SBE eligibility. Please note, your SBE status remains in effect unless Metro notifies you otherwise.

After the five-year certification period, your entire file will be reviewed in order to ascertain continued SBE certification status. You will be notified of the pending SBE status review and any documentation updates necessary prior to the expiration date.

Also, should any changes occur that could affect your certification status prior to receipt of the annual update application, such as changes in your firm's name, business/mailing address, ownership, management or control, or failure to meet the applicable business size standards or personal net worth standard, please notify Metro immediately.

Metro reserves the right to withdraw this certification if at any time it is determined that it was knowingly obtained by false, misleading, or incorrect information. Your SBE certification is subject to review at any time. The firm thereby consents to the examination of its books, records, and documents by Metro.

Congratulations, and thank you for your interest in Metro's SBE Program. Should you have any questions, please contact us at (213) 922-2600. For information on Metro contracting opportunities, please visit our website at www.metro.net/connect.

Sincerely,
Ramon Ortiz
Director, Certification & Economic Development PAGE 298 of 623 34 Maintenance Contract $30k or More
-1-
Revised-7.2025

MAINTENANCE SERVICES CONTRACT
Contract No. ___
THIS AGREEMENT (“AGREEMENT”) is made and entered into effective as of the 26th day of September, 2025, by and between the CITY OF SAN MARINO, a California municipal corporation, located at 2200 Huntington Drive, San Marino, CA 91108 (“CITY”)and G2 Construction, Inc. a California corporation with principal offices at 1352 E. Borchard Ave. Santa Ana, CA 92705, hereinafter referred to as CONTRACTOR.

W I T N E S S E T H:

For and in consideration of the promises and of the mutual covenants and agreements herein contained, said parties hereby agree as follows:

1. RECITALS. This AGREEMENT is made and entered into with respect to the following facts:
a. That CITY received a proposal, and utilizing bidding results from a master agreement from County of Orange (Contract No. MA-080- 25011708), staff determined that CONTRACTOR was the most qualified to provide those certain catch basin maintenance services to the CITY; and
b. That based upon Staff’s recommendation, the San Marino City Council has determined that CONTRACTOR is qualified to provide those certain catch basin maintenance services, and therefore the San Marino City Council has elected to engage the services of CONTRACTOR upon the terms and conditions hereinafter set forth.

2. SERVICES. CONTRACTOR shall perform those services described in CONTRACTOR’s Proposal dated September 9, 2025, (hereinafter referred to as Proposal and attached as Exhibit “A”). To the extent that Exhibit A is a proposal from CONTRACTOR, such proposal is incorporated only for the description of the scope of services and no other terms and conditions from any such proposal shall apply to this AGREEMENT. Performance of the work specified herein is made an obligation of CONTRACTOR under this AGREEMENT, subject to any changes made subsequently upon the mutual written agreement of the parties.

3. SCOPE. The services to be performed by CONTRACTOR under this AGREEMENT shall include, but not be limited to, those services specified in Paragraph 2 hereof.

PAGE 299 of 623
Maintenance Contract $30k or More
-2-
Revised-7.2025

4. FEE. Compensation to CONTRACTOR for the total services to be rendered pursuant to this AGREEMENT shall be in an amount not to exceed one hundred fifty thousand dollars ($150,000). Payment for any services rendered under this AGREEMENT shall be executed and approved by the City Council.

5. EXTRA SERVICES. No extra services shall be rendered by CONTRACTOR under this AGREEMENT unless such extra services first shall have been authorized in writing by the CITY. Any such services so authorized shall be paid by the CITY at the rates set forth in Exhibit A of this AGREEMENT.

6. PAYMENT BY CITY.
a. CONTRACTOR must furnish CITY with an invoice for all services rendered pursuant to this AGREEMENT. CONTRACTOR may not submit invoices more often than once every 30 days.
b. CITY will review each invoice and determine whether the services rendered in in accordance with this AGREEMENT. The CITY may require CONTRACTOR to provide a release of all undisputed amounts contained in the invoice.
c. If CITY disputes any item on an invoice, CITY will give CONTRACTOR notice stating, the reasons for the dispute. The parties will meet and confer in good faith to attempt to resolve the dispute.
d. Except as to any charges for the services rendered that the CITY disputes, CITY will cause CONTRACTOR to be paid within 30 days of the date of the invoice or the date that CONTRACTOR furnishes CITY with a release of all undisputed amounts, whichever occurs later.
e. In the event there is any claim specifically excluded by CONTRACTOR from the operation of any release, CITY may retain an amount not to exceed the amount of the excluded claim. f. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the AGREEMENT, and also including those arising form actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

PAGE 300 of 623
Maintenance Contract $30k or More
-3-
Revised-7.2025

7. CITY SUPERVISION. CITY SUPERVISION. Upon 24-hour notice from City, CONTRACTOR shall allow City or City’s agents or representatives to inspect at CONTRACTOR’s offices during reasonable business hours all records, invoices, time cards, cost control sheets and other records maintained CONTRACTOR in connection with this AGREEMENT. City’s rights under this Section 7 shall survive for two years following the expiration or earlier termination of this AGREEMENT.

8. TIME. The term of this AGREEMENT shall be for a period as set forth in a Notice to Commence Work to be issued by the CITY. CONTRACTOR shall complete all those services set forth in its PROPOSAL by that certain date set forth in said Notice to Commence Work or until such time as the services have been completed by the CONTRACTOR and accepted by the CITY, whichever occurs first. The CITY may extend said time of completion for delays caused by circumstances beyond the control of either party to this AGREEMENT. Should the AGREEMENT extend beyond the estimated time for completion of said services, CITY hereby reserves the right to continue CONTRACTOR’s services hereunder with any and all fees for such additional services to be compensated by the CITY in accordance with Paragraph 4 of this AGREEMENT.

9. TERMINATION OF AGREEMENT.
a. Except as otherwise provided, CITY may terminate this AGREEMENT at any time with or without cause upon providing written notice to CONTRACTOR at least thirty (30) days before the effective termination date. Notice of termination will be in writing. In the event of a termination for convenience, the CITY , based upon work accomplished by CONTRACTOR prior to notice of such termination, shall determine the amount of fees to be paid to CONTRACTOR for such services based upon accepted practices of the CONTRACTOR’S field of work, and such finding by the CITY, and shall be final and conclusive as to the amount of such fee. b. Should the AGREEMENT be terminated pursuant to this Section, CONTRACTOR shall immediately cease work except for work necessary to secure the job site and any materials not yet incorporated into the work. Once the job site is secured, CONTRACTOR shall vacate the premises. CITY may procure on its own terms services similar to those terminated.
c. Upon termination of this AGREEMENT by CITY, CONTRACTOR shall transfer possession of all fixed items, including but not limited to fencing, construction trailers, and any other equipment or materials affixed to the project site, to CITY. CONTRACTOR shall ensure that all such items are in good working condition and free from any liens or encumbrances. CONTRACTOR shall provide CITY PAGE 301 of 623
Maintenance Contract $30k or More
-4-
Revised-7.2025
with all necessary documentation related to the fixed items, including warranties, maintenance records, and any other relevant information. CONTRACTOR shall also coordinate with CITY to facilitate the smooth handover of these items.
d. By executing this document, CONTRACTOR waives any and all claims for damages that might otherwise arise from CITY’s termination under this Section.

10. INDEPENDENT CONTRACTOR. CONTRACTOR is and will at all times remain as to CITY a wholly independent contractor. Neither the CITY nor any of its officers, employees, or agents will have control over the conduct of CONTRACTOR or any of CONTRACTOR’s officers, employees, agents or subcontractors, except as expressly set forth in the AGREEMENT.

CONTRACTOR may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of CITY.

11. NONASSIGNMENT. This AGREEMENT is not assignable either in whole or in part by CONTRACTOR without the written consent of CITY. Any purported assignment without such consent shall be void and without effect.

12. INDEMNIFICATION. CONTRACTOR shall indemnify, defend with legal counsel approved by CITY—or, at the CITY’s option, reimburse the CITY Indemnitees their costs of defense—and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorney’s fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this agreement. CONTRACTOR’s obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the sole active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY’s active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

Should conflict of interest principles preclude a single attorney from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s attorney unacceptable, then CONTRACTOR shall reimburse the CITY its costs of PAGE 302 of 623
Maintenance Contract $30k or More
-5-
Revised-7.2025
defense, including without limitation reasonable attorney’s fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees, and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless, or wrongful performance.

Payment by CITY is not a condition precedent to enforcement of this indemnity. In the event of any dispute between CONTRACTOR and CITY, as to whether liability arises from the sole active negligence or willful misconduct of the CITY or its officers, employees, or agents, CONTRACTOR will be obligated to pay for CITY’s defense until such time as a final judgment has been entered adjudicating the CITY as solely negligent or to have acted with willful misconduct. CONTRACTOR will not be entitled in the absence of such a determination to any reimbursement of defense costs including but not limited to attorney’s fees, expert fees, and costs of litigation.

It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this agreement.

13. NON-DISCRIMINATION. CONTRACTOR shall not discriminate in its recruiting, hiring, promotion, demotion or termination practices on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, martial status, sex, age, or sexual orientation in the performance of this AGREEMENT and shall comply with the provisions of the California Fair Employment and Housing Act as set forth in Part 2.8 of Division 3, Title 2 of the California Government Code; the Federal Civil Rights Act of 1964, as set forth in Public Law 88-352, and all amendments thereto; Executive Order 11246; and all administrative rules and regulations issued pursuant to such acts and order.

14. PREVAILING WAGES. CONTRACTOR is aware of and agrees to abide by the provisions of California Labor Code Sections 1720, et seq., as well as 1771, 1773, 1773.1, 1773.6, 1773.7, 1775 and 1776, pertaining to the obligation to pay prevailing wages with respect to the performance of work as described in Paragraph 2 herein. Copies of the prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work for each craft are available upon request from the CITY. A copy of the prevailing rate of per diem wages shall be posted at the job site. CONTRACTOR and its subcontractors must keep accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this AGREEMENT. If requested by CITY, CONTRACTOR must provide copies of the records at its cost.

15. UNAUTHORIZED ALIENS. CONTRACTOR hereby promises and agrees to comply with all of the provisions of the Federal Immigration and PAGE 303 of 623
Maintenance Contract $30k or More
-6-
Revised-7.2025
Nationality Act (8 USCA 1101, et seq.), as amended; and, in connection therewith, shall not employ unauthorized aliens as defined therein. Should CONTRACTOR so employ such unauthorized aliens for the performance of work and/or services covered by this AGREEMENT, and should the Federal Government impose sanctions against the CITY for such use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, reimburse CITY for the cost of all such sanctions imposed, together with any and all costs, including attorney’s fees, incurred by the CITY in connection therewith.

16. WAIVER. Waiver by any party hereto of any term, condition, or covenant of this AGREEMENT shall not constitute the waiver of any other term, condition or covenant hereof.

17. ATTORNEY’S FEES. If litigation is reasonably required to enforce or interpret the provisions of this AGREEMENT, the prevailing party in such litigation shall be entitled to an award of reasonable attorney’s fees, in addition to any other relief to which it may be entitled.

18. BINDING EFFECT. This AGREEMENT shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

19. PROVISIONS, CUMULATIVE. The provisions of this AGREEMENT are cumulative and in addition to and not in limitation of any rights or remedies available to CITY.

20. NO PRESUMPTION RE: DRAFTER. The parties acknowledge and agree that the terms and provisions of this AGREEMENT have been negotiated and discussed between the parties and their attorneys, and this AGREEMENT reflects their mutual AGREEMENT regarding the same. Because of the nature of such negotiations and discussions it would be inappropriate to deem any party to be the drafter of this AGREEMENT; and, therefore, no presumption for or against validity or as to any interpretation hereof, based upon the identity of the drafter, shall be applicable in interpreting or enforcing this AGREEMENT.

21. ASSISTANCE OF COUNSEL. Each party to this AGREEMENT warrants to each other party as follows:
a. That each party either had the assistance of counsel or had counsel available to it, in the negotiation for, and execution of, this AGREEMENT, and all related documents; and,
b. That each party has lawfully authorized the execution of this AGREEMENT.

22. MODIFICATION. This AGREEMENT shall not be modified except by written agreement of the parties.

PAGE 304 of 623
Maintenance Contract $30k or More
-7-
Revised-7.2025

23. GOVERNING LAW. This AGREEMENT shall be interpreted and construed according to the laws of the State of California.

24. NOTICE. Whenever it shall be necessary for either party to serve notice on the other regarding this AGREEMENT, such notice must be furnished in writing by either party to the other and shall be served by personal service as required in judicial proceedings or by certified mail, postage prepaid, return receipt requested, addressed to the parties as follows:

CITY: City of San Marino
2200 Huntington Drive
San Marino, California 91108
Attn: City Manager
CONTRACTOR: CONTRACTOR NAME

CONTRACTOR ADDRESS
CITY, CA 90807
Attn: CONTRACTOR REPRESENTATIVE
Notice will be deemed effective on the date personally delivered or transmitted by facsimile. If the notice is mailed, notice will be deemed given three days after deposit of the same in the custody of the United States Postal Service, postage prepaid, for first class delivery, or upon delivery if using a major courier service with tracking capabilities. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph.

25. FORCE MAJEURE. Neither party shall be responsible for delays or failures in performance resulting from acts beyond the control of the offending party. Such acts shall include, but not be limited to, acts of God, fire, flood, earthquake, or other natural disaster, nuclear accident, explosion war, terrorist attack, embargo, strike, lockout, riot, freight embargo, public regulated utility, or government statutes or regulations superimposed after the fact.

26. INSURANCE. Without limiting CONTRACTOR’S indemnification of CITY, and prior to commencement of work and/or services under this AGREEMENT, CONTRACTOR shall obtain, provide, and maintain at its own expense during the term of this AGREEMENT, policies of insurance of the type and amounts described below and in a form satisfactory to CITY. a. General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, PAGE 305 of 623
Maintenance Contract $30k or More
-8-
Revised-7.2025
for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
b. Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this AGREEMENT, including coverage for any owned, hired, non-owned, or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. c. Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (statutory limits) and Employer’s Liability insurance (with limits of at least $1,000,000). d. CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees, and volunteers.
e. Professional liability (errors & omissions) insurance. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this agreement and Consultant agrees to maintain continuous coverage through a period no less than three years after completion of the services required by this agreement.
f. Proof of insurance. CONTRACTOR shall provide certificates of insurance and required endorsements to CITY as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by CITY prior to commencement of performance. Current certification of insurance shall be kept on file with CITY for the contract period and any additional length of time required thereafter. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. g. Duration of coverage. CITY shall procure and maintain for the contract period, and any additional length of time required thereafter, insurance against claims for injuries to persons or damages to property, or financial loss which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, their agents, representatives, employees, or subconsultants.

PAGE 306 of 623
Maintenance Contract $30k or More
-9-
Revised-7.2025
h. Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY before the CITY’S own insurance or selfinsurance shall be called upon to protect it as a named insured. i. CITY’S rights of enforcement. In the event any policy of insurance required under this AGREEMENT does not comply with these specifications or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary, and any premium paid by CITY will be promptly reimbursed by
CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this AGREEMENT.
j. Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY. k. Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow CONTRACTOR’S or others providing insurance evidence in
compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against CITY and shall require similar written express waivers and insurance clauses from each of its subconsultants. l. Enforcement of contract provisions (non estoppel).

CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of noncompliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.
m. Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific PAGE 307 of 623
Maintenance Contract $30k or More
-10-
Revised-7.2025
reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.
n. Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide the CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. If any of the CONTRACTOR’S insurers are unwilling to provide such notice, then CONTRACTOR shall have the responsibility of notifying the CITY immediately in the event of CONTRACTOR’S failure to renew any of the required insurance coverages, or insurer’s cancellation or non-renewal.
o. Additional insured status. General liability, automobile liability, and umbrella/excess liability insurance policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies.
p. Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing. q. Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
r. Pass through clause. CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party who is brought onto or involved in the project/service by CONTRACTOR
(hereinafter collectively “Subcontractor”), provide the same minimum insurance coverage and endorsements required of CONTRACTOR under this AGREEMENT. CONTRACTOR agrees to monitor and
review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements PAGE 308 of 623
Maintenance Contract $30k or More
-11-
Revised-7.2025
of this section. However, in the event CONTRACTOR’S
Subcontractor cannot comply with this requirement, which proof must be submitted to the CITY, CONTRACTOR may still be able to utilize the Subcontractor provided CONTRACTOR shall be required to ensure that its Subcontractor provide and maintain insurance coverage and endorsements sufficient to the specific risk of exposure involved with Subcontractor’s scope of work and services, with limits less than required of the CONTRACTOR, but in all other terms consistent with the CONTRACTOR’S requirements under this AGREEMENT. This provision does not relieve the CONTRACTOR of its contractual obligations under the AGREEMENT and/or limit its liability to the amount of insurance coverage provided by its subcontractors. This provision is intended solely to provide CONTRACTOR with the ability to utilize a Subcontractor who may be otherwise qualified to perform the work or services but may not carry the same insurance limits as required of the CONTRACTOR under this AGREEMENT given the limited scope of work or services provided by the subcontractor. CONTRACTOR agrees that upon request, all agreements with Subcontractors, and others engaged in the project and/or services, will be submitted to CITY for review. s. CITY’S right to revise specifications. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’S
compensation.
t. Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention through confirmation from the underwriter. u. Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’S performance under this
AGREEMENT, and that involve or may involve coverage under any of the required liability policies.
v. Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.

PAGE 309 of 623
Maintenance Contract $30k or More
-12-
Revised-7.2025

27. ELECTRONIC TRANSMISSION OF AGREEMENT AND
SIGNATURE. The Parties agree that this AGREEMENT may be signed and transmitted by electronic mail by either/any or both/all Parties, and that such electronically transmitted signatures or hard copy reproduction shall have the same force and effect as original signatures, in accordance with California Government Code section 16.5 and Civil Code section 1633.7. [signatures on following page]
PAGE 310 of 623
Maintenance Contract $30k or More
-13-
Revised-7.2025
IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed on the date first above written by their respective officers duly authorized in that behalf.

CITY OF SAN MARINO, a
California municipal corporation
ATTEST:

by_________________________
Philippe Eskandar, City Manager
_____________________________
Alison Walker, City Clerk

CONTRACTOR
_________________________
By:________________________
Signature
__________________________
Print Name

Title:_______________________
President/ Vice President
By:________________________
Signature
__________________________
Print Name

Title:_______________________
Secretary /Treasurer

APPROVED AS TO FORM
by_____________________________________
JOSEPH M. MONTES, City Attorney
PAGE 311 of 623
Maintenance Contract $30k or More
-14-
Revised-7.2025
Exhibit A
Proposal
PAGE 312 of 623
G2 Construction Proposal CITY OF SAN MARINO
Lic. #801253 - A, C8, C60
1352 E. Borchard Ave.

Santa Ana, CA 92705
714.748.4242
Customer: City of San Marino Prepared: 9/9/2025
Public Works Department Proposal #: 250909-SM
2200 Huntington Drive
San Marino, CA 91108
Eric H. Taylor
Contact: Amber Shah, P.E. By: Eric H. Taylor
Public Works Director / City Engineer G2 Construction, Inc. 626.300.0787 714.679.2550
<[email protected]> [email protected]
continued
For County-owned CBs G2 will locate and field review and research 134 LACDPW-owned CBs, research the County's database, and generate the "Exhibit A" spreadsheet required to apply for a Flood Control Permit application. G2 will provide expertise and assist with the City's application, and this will allow for installations in 2026-27.

PROPOSAL for CITY of SAN MARINO
Catch Basin Trash Device Project 2025

DESCRIPTION
For City-owned CBs G2 will collect the required field data, then fabricate and install 49 G2 CPSMod™ certified Full Capture Systems . G2 will also fabricate and install G2 ARS-CL™ curbopening devices in 15 CBs that do not currently have a curb screen.

G2 Construction (G2) proposes the fabrication and installation of G2's patented catch basin trash devices in San Marino City-Owned catch basins (CBs). G2 also proposes to field review and collect measurements and data for LACDPW-owned CBs necessary to apply for an LA County Flood Control Permit to allow future device installations.

Installation work to be performed at Prevailing Wage rates and certified payroll submitted to DIR.

G2 will perform all work except for catch basin cleaning. Sub-Contractor Ron's Maintenance (RMI) will clean the CBs prior to CPS-Mod installation.

The project's pricing will match and piggyback on G2's existing Master Purchase Agreement with Orange County Public Works MA-080-25011708. G2 will provide the following services for this project:
1 of 2
2 PAGE 313 of 623
G2 Construction Proposal CITY OF SAN MARINO
continued
CITY Catch Basin Device Installations
Item Description Qty Price Unit Sub-Total

1. 56 $92 /CB $5,152

2. 2.1 CPS-Mod - 4.6-6.0 sqft filtration 38 $1,476 /CPS-Mod $56,088

2.2 CPS-Mod - 6.1 to 9.0 sqft filtration 5 $1,753 /CPS-Mod $8,765

2.3 CPS-Mod - 9.1-11.0 sqft filtration 6 $1,975 /CPS-Mod $11,850 Totals Full Capture System Devices: 49
CPS-Mod Special Conditions

2.4 Heavy Duty CPS-Mod add 10 $482 /device $4,820

2.5 Custom CPS-Mod add 8 $672 /device $5,376

2.6 Removal of Existing Devices 1 $550 /CB $550

3. 3.1 ARS-CL-05 5' (1) 7 $1,535 /CB $10,745

3.2 ARS-CL-07 7' (2) 4 $2,641 /CB $10,564

3.3 ARS-CL-10 10' (2) 2 $2,900 /CB $5,800

3.4 ARS-CL-14x 14 (3) 1 $3,766 /CB $3,766

3.5 ARS-CL-14x 14' (4) 1 $4,647 /CB $4,647
Totals ARS-CL Catch Basins: 15
4 Catch Basin Cleaning prior to installs. 49 $80 /CB $3,920 CB cleaning performed by sub-contractor RMI.
5 Traffic Control during installation (days) 1 $3,155 /Day $3,155 6 Photos of installed devices. 1 Free
7 Provide project management for installation. 1 Free
COUNTY Catch Basins

8.1 134 $92 /CB $12,328

8.2 134 $92 /CB Free

8.3 45 $120 /HR Free
9 Project Bonds 1 $2,589
10 If needed, discount to keep the project on $150K budget. -$115 Project Total: $150,000
Field Review & Measurements (Locating CBs &
Recording Data). Enter and format data for Application.

LA County Flood Control Permit "Exhibit A" Preparation
(Collecting Lat/Long, Storm Lines, Data & formatting) & Submittal to LACFC. Priced @ 50% of MA pricing.

Project Management to assist the City with submitting and obtaining the County's Flood Control Permit.

Fabricate and install 49 CPS-Mod™ FULL
CAPTURE SYSTEMS and perform technical install
(prevailing wage). Devices made of 304 stainless
steel with 5mm perforations.

Fabricate ARS-CL™ curb-opening screens and
install 15 catch basins. There will be
approximately 26 unique ARS-CL™ screens. Devices
made of 304 stainless steel with 3/4" filtration holes.

Field Review & Measurements (Locating CBs &
Recording Data). Enter and format data for Application. 2 of 2
3 PAGE 314 of 623
City of San Marino
2025 PROJECT OVERVIEW MAP
5 PAGE 315 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 1 of 35 ends

File No. 2736403
Contract MA-080-25011708
For
Trash and Debris Capture Devices
Between
County of Orange
And
G2 Construction Inc.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 316 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 2 of 35 ends

File No. 2736403

CONTRACT
MA-080-25011708

BETWEEN

COUNTY OF ORANGE
AND
G2 CONSTRUCTION INC.

FOR

TRASH AND DEBRIS CAPTURE DEVICES
This Aggregate Contract MA-080-25011708 for Trash and Debris Capture Devices (Contract) is made and entered into as of the date fully executed by and between the County of Orange, a political subdivision of the State of California (“County”), and G2 Construction Inc., a California Corporation (Contractor), with County and Contractor sometimes referred to as Party or collectively as Parties.

ATTACHMENTS
This Contract is comprised of this document and the following Attachments, which are attached hereto and incorporated by reference into this Contract:

Attachment A – Scope of Work
Attachment B – Payment and Compensation

RECITALS
WHEREAS, Contractor and County are entering into this Contract for Trash and Debris Capture Devices under a usage Contract; and,
WHEREAS, County solicited Contract for Trash and Debris Capture Devices as set forth herein, and Contractor represented that it is qualified to provide Trash and Debris Capture Devices to the County as further set forth here; and,
WHEREAS, Contractor agrees to provide Trash and Debris Capture Devices to the County as further set forth in the Scope of Work, attached hereto as Attachment A; and, WHEREAS, County agrees to pay Contractor based on the schedule of fees set forth in Payment/Compensation, attached hereto as Attachment B; and, NOW, THEREFORE, the Parties mutually agree as follows:

ARTICLES

GENERAL TERMS AND CONDITIONS

1. Governing Law and Venue:

This Contract has been negotiated and executed in the state of California and shall be governed by and construed under the laws of the state of California. In the event of any legal action to enforce or interpret this Contract, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the parties hereto agree to and do hereby submit to the jurisdiction of such court, Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 317 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 3 of 35 ends

File No. 2736403
notwithstanding Code of Civil Procedure Section 394. Furthermore, the parties specifically agree to waive any and all rights to request that an action be transferred for adjudication to another county.

2. Entire Contract:

This Contract and its Attachments contains the entire Contract between the parties with respect to the matters herein, and there are no restrictions, promises, warranties or undertakings other than those set forth herein or referred to herein. No exceptions, alternatives, substitutes or revisions are valid or binding on County unless authorized by County in writing. Electronic acceptance of any additional terms, conditions or supplemental Contracts by any County employee or agent, including but not limited to installers of software, shall not be valid or binding on County unless accepted in writing by County’s Purchasing Agent or designee.

3. Amendments:

No alteration or variation of the terms of this Contract shall be valid unless made in writing and signed by the parties; no oral understanding or agreement not incorporated herein shall be binding on either of the parties; and no exceptions, alternatives, substitutes or revisions are valid or binding on County unless authorized by County in writing.

4. Taxes:

Unless otherwise provided herein or by law, price quoted does not include California state sales or use tax. Out-of-state Contractors shall indicate California Board of Equalization permit number and sales permit number on invoices, if California sales tax is added and collectable. If no permit numbers are shown, sales tax will be deducted from payment. The Auditor-Controller will then pay use tax directly to the State of California in lieu of payment of sales tax to Contractor.

5. Delivery:

Time of delivery of commodities and services is of the essence in this Contract. County reserves the right to refuse any commodities and services and to cancel all or any part of the commodities not conforming to applicable specifications, drawings, samples or descriptions or services that do not conform to the prescribed scope of work. Acceptance of any part of the order for commodities shall not bind County to accept future shipments nor deprive it of the right to return commodities already accepted at Contractor’s expense. Over shipments and under shipments of commodities shall be only as agreed to in writing by County. Delivery shall not be deemed to be complete until all commodities or services have actually been received and accepted in writing by County.

6. Acceptance Payment:

Unless otherwise agreed to in writing by County, 1) acceptance shall not be deemed complete unless in writing and until all the commodities/services have actually been received, inspected, and tested to the satisfaction of County, and 2) payment shall be made in arrears after satisfactory acceptance.

7. Warranty:

Contractor expressly warrants that the commodities covered by this Contract are 1) free of liens or encumbrances, 2) merchantable and good for the ordinary purposes for which they are used, and 3) fit for the particular purpose for which they are intended. Acceptance of this order shall constitute an agreement Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 318 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 4 of 35 ends

File No. 2736403
upon Contractor’s part to indemnify, defend and hold County and its indemnities as identified in the Insurance and Indemnification section, and as more fully described in the Insurance and Indemnification section harmless from liability, loss, damage and expense, including reasonable counsel fees, incurred or sustained by County by reason of the failure of the goods/services to conform to such warranties, faulty work performance, negligent or unlawful acts, and non-compliance with any applicable state or federal codes, ordinances, orders, or statutes, including the Occupational Safety and Health Act (OSHA) and the California Industrial Safety Act. Such remedies shall be in addition to any other remedies provided by law.

8. Patent/Copyright Materials/Proprietary Infringement:

Unless otherwise expressly provided in this Contract, Contractor shall be solely responsible for clearing the right to use any patented or copyrighted materials in the performance of this Contract. Contractor warrants that any software as modified through services provided hereunder will not infringe upon or violate any patent, proprietary right, or trade secret right of any third party. Contractor agrees that, in accordance with the more specific requirement contained in the Insurance and Indemnification section, it shall indemnify, defend and hold County and County Indemnitees harmless from any and all such claims and be responsible for payment of all costs, damages, penalties and expenses related to or arising from such claim(s), including, costs and expenses but not including attorney’s fees.

9. Assignment:

The terms, covenants, and conditions contained herein shall apply to and bind the heirs, successors, executors, administrators and assigns of the parties. Furthermore, neither the performance of this Contract nor any portion thereof may be assigned by Contractor without the express written consent of County. Any attempt by Contractor to assign the performance or any portion thereof of this Contract without the express written consent of County shall be invalid and shall constitute a breach of this Contract.

10. Non-Discrimination:

In the performance of this Contract, Contractor agrees that it will comply with the requirements of Section 1735 of the California Labor Code and not engage nor permit any subcontractors to engage in discrimination in employment of persons because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, or sex of such persons. Contractor acknowledges that a violation of this provision shall subject Contractor to penalties pursuant to Section 1741 of the California Labor Code.

11. Termination:

In addition to any other remedies or rights it may have by law, County has the right to immediately terminate this Contract without penalty for cause or after 30 days’ written notice without cause, unless otherwise specified. Cause shall be defined as any material breach of contract, any misrepresentation or fraud on the part of Contractor. Exercise by County of its right to terminate Contract shall relieve County of all further obligation.

12. Consent to Breach Not Waiver:

No term or provision of this Contract shall be deemed waived and no breach excused, unless such waiver or consent shall be in writing and signed by the party claimed to have waived or consented. Any consent Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 319 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 5 of 35 ends

File No. 2736403
by any party to, or waiver of, a breach by the other, whether express or implied, shall not constitute consent to, waiver of, or excuse for any other different or subsequent breach.

13. Independent Contractor:

Contractor shall be considered an independent contractor and neither Contractor, its employees, nor anyone working under Contractor shall be considered an agent or an employee of County. Neither Contractor, its employees nor anyone working under Contractor shall qualify for workers’ compensation or other fringe benefits of any kind through County.

14. Performance Warranty:

Contractor shall warrant all work under this Contract, taking necessary steps and precautions to perform the work to County’s satisfaction. Contractor shall be responsible for the professional quality, technical assurance, timely completion and coordination of all documentation and other commodities/services furnished by Contractor under this Contract. Contractor shall perform all work diligently, carefully, and in a good and workmanlike manner; shall furnish all necessary labor, supervision, machinery, equipment, materials, and supplies, shall at its sole expense obtain and maintain all permits and licenses required by public authorities, including those of County required in its governmental capacity, in connection with performance of the work. If permitted to subcontract, Contractor shall be fully responsible for all work performed by subcontractors.

15. Changes:

Contractor shall make no changes in the work or perform any additional work without County’s specific written approval.

16. Change of Ownership/Name, Litigation Status, Conflicts with County Interests:

Contractor agrees that if there is a change or transfer in ownership of Contractor’s business prior to completion of this Contract, and the County agrees to an assignment of the Contract, the new owners shall be required under terms of sale or other transfer to assume Contractor’s duties and obligations contained in this Contract and complete them to the satisfaction of the County.

Notwithstanding other notice or termination provisions contained herein, County reserves the right to immediately terminate the Contract, as of the date on which the County provides written determination of termination of the Contract under this provision anytime upon or after assignment, in the event that the County determines that the assignee is not qualified or is otherwise unacceptable to the County for the provision of services or products under the Contract. . In the event of an immediate termination under this provision, the Contractor shall promptly refund the County an amount equal to the pro rata portion of any charges the County paid in advance for any remaining portion of the Contract after the date of termination. Likewise, the County shall not be liable for payment for any remaining services under the Contract after the date of termination for any payments to be made in arrears pursuant to the terms of the Contract.

17. Force Majeure:

Contractor shall not be assessed with liquidated damages or unsatisfactory performance penalties during any delay beyond the time named for the performance of this Contract caused by any act of God, war, civil disorder, employment strike or other cause beyond its reasonable control, provided Contractor gives written Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 320 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 6 of 35 ends

File No. 2736403
notice of the cause of the delay to County within 36 hours of the start of the delay and Contractor avails himself of any available remedies.

18. Confidentiality:

Contractor agrees to maintain the confidentiality of all County and County-related records and information pursuant to all statutory laws relating to privacy and confidentiality that currently exist or exist at any time during the term of this Contract. All such records and information shall be considered confidential and kept confidential by Contractor and Contractor’s staff, agents and employees.

19. Compliance with Laws:

Contractor represents and warrants that services to be provided under this Contract shall fully comply, at Contractor’s expense, with all standards, laws, statutes, restrictions, ordinances, requirements, and regulations (collectively “laws”), including, but not limited to those issued by County in its governmental capacity and all other laws applicable to the services at the time services are provided to and accepted by County. Contractor acknowledges that County is relying on Contractor to ensure such compliance, and pursuant to the requirements of the Insurance and Indemnification section, Contractor agrees that it shall defend, indemnify and hold County and County Indemnitees harmless from all liability, damages, costs and expenses arising from or related to a violation of such laws.

20. Freight:

Prior to County’s express acceptance of delivery of products. Contractor assumes full responsibility for all transportation, transportation scheduling, packing, handling, insurance, and other services associated with delivery of all products deemed necessary under Contract.

21. Severability:

If any term, covenant, condition or provision of this Contract is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions hereof shall remain in full force and effect and shall in no way be affected, impaired or invalidated thereby.

22. Attorney Fees:

In any action or proceeding to enforce or interpret any provision of this Contract, each party shall bear their own attorney’s fees, costs and expenses.

23. Interpretation:

This Contract has been negotiated at arm’s length and between persons sophisticated and knowledgeable in the matters dealt with in this Contract. In addition, each party had been represented by experienced and knowledgeable independent legal counsel of their own choosing or has knowingly declined to seek such counsel despite being encouraged and given the opportunity to do so. Each party further acknowledges that they have not been influenced to any extent whatsoever in executing this Contract by any other party hereto or by any person representing them, or both. Accordingly, any rule or law (including California Civil Code Section 1654) or legal decision that would require interpretation of any ambiguities in this Contract against the party that has drafted it is not applicable and is waived. The provisions of this Contract shall be interpreted in a reasonable manner to effect the purpose of the parties and this Contract.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 321 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 7 of 35 ends

File No. 2736403

24. Employee Eligibility Verification:

Contractor warrants that it fully complies with all Federal and State statutes and regulations regarding the employment of aliens and others and that all its employees performing work under this Contract meet the citizenship or alien status requirement set forth in Federal statutes and regulations. Contractor shall obtain, from all employees performing work hereunder, all verification and other documentation of employment eligibility status required by Federal or State statutes and regulations including, but not limited to, the Immigration Reform and Control Act of 1986, 8 U.S.C. §1324 et seq., as they currently exist and as they may be hereafter amended. Contractor shall retain all such documentation for all covered employees for the period prescribed by the law. Contractor shall indemnify, defend with counsel approved in writing by County, and hold harmless, County, its agents, officers, and employees from employer sanctions and any other liability which may be assessed against Contractor or County or both in connection with any alleged violation of any Federal or State statutes or regulations pertaining to the eligibility for employment of any persons performing work under this Contract.

25. Audits/Inspections:

Contractor agrees to permit County’s Auditor-Controller or the Auditor-Controller’s authorized representative (including auditors from a private auditing firm hired by County) access during normal working hours to all books, accounts, records, reports, files, financial records, supporting documentation, including payroll and accounts payable/receivable records, and other papers or property of Contractor for the purpose of auditing or inspecting any aspect of performance under this Contract. The inspection and/or audit will be confined to those matters connected with the performance of Contract including, but not limited to, the costs of administering Contract. County will provide reasonable notice of such an audit or inspection.

County reserves the right to audit and verify Contractor’s records before final payment is made.

Contractor agrees to maintain such records for possible audit for a minimum of three years after final payment, unless a longer period of records retention is stipulated under this Contract or by law. Contractor agrees to allow interviews of any employees or others who might reasonably have information related to such records. Further, Contractor agrees to include a similar right to County to audit records and interview staff of any subcontractor related to performance of this Contract.

Should Contractor cease to exist as a legal entity, Contractor’s records pertaining to this Contract shall be forwarded to County’s project manager.

26. Contingency of Funds:

Contractor acknowledges that funding or portions of funding for this Contract may be contingent upon state budget approval; receipt of funds from, and/or obligation of funds by, the state of California to County; and inclusion of sufficient funding for the services hereunder in the budget approved by County’s Board of Supervisors for each fiscal year covered by this Contract. If such approval, funding or appropriations are not forthcoming, or are otherwise limited, County may immediately terminate or modify this Contract without penalty.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 322 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 8 of 35 ends

File No. 2736403

27. Expenditure Limit:

Contractor shall notify County of Orange assigned Deputy Purchasing Agent in writing when the expenditures against Contract reach 75 percent of the dollar limit on Contract. County will not be responsible for any expenditure overruns and will not pay for work exceeding the dollar limit on Contract unless a change order to cover those costs has been issued.

INDEMNIFICATION AND INSURANCE PROVISIONS

1. Indemnification
Contractor agrees to indemnify, defend with counsel approved in writing by County, and hold County, its elected and appointed officials, officers, employees, agents and those special districts and agencies which County’s Board of Supervisors acts as the governing Board (“County Indemnitees”) harmless from any claims, demands or liability of any kind or nature, including but not limited to personal injury or property damage, arising from or related to the services, products or other performance provided by Contractor pursuant to this Contract. If judgment is entered against Contractor and County by a court of competent jurisdiction because of the concurrent active negligence of County or County Indemnitees, Contractor and County agree that liability will be apportioned as determined by the court. Neither Party shall request a jury apportionment. Notwithstanding anything stated above, nothing contained herein shall relieve Contractor of any insurance requirements of obligations created elsewhere in this Contract.

2. General Insurance Requirements
Prior to the provision of services under this Contract, the Contractor agrees to carry all required insurance at Contractor’s expense, including all endorsements required herein, necessary to satisfy the County that the insurance provisions of this Contract have been complied with. Contractor agrees to keep such insurance coverage current, provide Certificates of Insurance, and endorsements to the County during the entire term of this Contract.

Contractor shall ensure that all subcontractors performing work on behalf of Contractor pursuant to this Contract shall be covered under Contractor’s insurance as an Additional Insured or maintain insurance subject to the same terms and conditions as set forth herein for Contractor. Contractor shall not allow subcontractors to work if subcontractors have less than the level of coverage required by County from Contractor under this Contract. It is the obligation of Contractor to provide notice of the insurance requirements to every subcontractor and to receive proof of insurance prior to allowing any subcontractor to begin work. Such proof of insurance must be maintained by Contractor through the entirety of this Contract for inspection by County representative(s) at any reasonable time.

All self-insured retentions (SIR)’s shall be clearly stated on the Certificate of Insurance. Any SIR in excess of Fifty Thousand Dollars $50,000 shall specifically be approved by the County’s Risk Manager, or designee. The County reserves the right to require current audited financial reports from Contractor. If Contractor is self-insured, Contractor will indemnify the County for any and all claims resulting or arising from Contractor’s services in accordance with the indemnity provision stated in this contract.

If the Contractor fails to maintain insurance acceptable to the County for the full term of this Contract, the County may terminate this Contract.

Qualified Insurer
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 323 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 9 of 35 ends

File No. 2736403
The policy or policies of insurance must be issued by an insurer with a minimum rating of A- (Secure A.M.

Best's Rating) and VIII (Financial Size Category as determined by the most current edition of the Best's Key Rating Guide/Property-Casualty/United States or ambest.com).

If the insurance carrier does not have an A.M. Best Rating of A-/VIII, the CEO/Office of Risk Management retains the right to approve or reject a carrier after a review of the company's performance and financial ratings.

The policy or policies of insurance maintained by the Contractor shall provide the minimum limits and coverage as set forth below.

Increased insurance limits may be satisfied with Excess/Umbrella policies. Excess/Umbrella policies when required must provide Follow Form coverage.

All insurance policies required by this Contract shall waive all rights of subrogation against the County of Orange, its elected and appointed officials, officers, employees, and agents when acting within the scope of their appointment or employment.

Contractor shall provide thirty (30) days prior written notice to the County of any policy cancellation or non-renewal and ten (10) days prior written notice where cancellation is due to non-payment of premium and provide a copy of the cancellation notice to County. Failure to provide written notice of cancellation may constitute a material breach of the Contract, upon which the County may suspend or terminate this Contract.

Insurance certificates should be forwarded to the agency/department address listed on the solicitation.

If the Contractor fails to provide the insurance certificates and endorsements within seven (7) days of notification by CEO/Purchasing or the agency/department purchasing division, award may be made to the next qualified vendor.

County expressly retains the right to require Contractor to increase or decrease insurance of any of the above insurance types throughout the term of this Contract. Any increase or decrease in insurance will be as deemed by County of Orange Risk Manager as appropriate to adequately protect County.

County shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not provide acceptable Certificates of Insurance and endorsements to County incorporating such changes within thirty (30) days of receipt of such notice, this Contract may be in breach without further notice to Contractor, and County shall be entitled to all legal remedies.

The procuring of such required policy or policies of insurance shall not be construed to limit Contractor's liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract, nor act in any way to reduce the policy coverage and limits available from the insurer.

3. Commercial General Liability
Including Products - Completed Operations
Minimum limits and coverage
$1,000,000 per occurrence; $2,000,000 aggregate
Required Coverage Forms
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 324 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 10 of 35 ends

File No. 2736403
The Commercial General Liability coverage shall be written on occurrence basis utilizing Insurance Services Office (ISO) form CG 00 01, or a substitute form providing liability coverage at least as broad.

Required Endorsements
The Commercial General Liability policy shall contain the following endorsements, which shall accompany the Certificate of Insurance:

A. An Additional Insured endorsement using ISO form CG 20 26 04 13, or a form at least as broad naming the County of Orange its elected and appointed officials, officers, employees, and agents as Additional Insureds, or provide blanket coverage, which will state As Required by Written Contract.

B. A primary non-contributory endorsement using ISO form CG 20 01 04 13, or a form at least as broad evidencing that the Contractor's insurance is primary, and any insurance or self-insurance maintained by the County shall be excess and non-contributing.

C. Products and Completed Operations endorsement using ISO Form CG 20 37 04 13, or a form at least as broad.

The Commercial General Liability policy shall contain a severability of interests clause also known as a “separation of insureds” clause (standard in the ISO CG 0001 policy).

4. Automobile Liability including coverage for owned, non-owned and hired vehicles Minimum limits and coverage
$1,000,000 combined Single Limit
Required Coverage Forms
The Business Auto Liability coverage shall be written on ISO form CA 00 01, CA 00 05, CA 0012, CA 00 20, or a substitute form providing coverage at least as broad.

5. Workers Compensation
Minimum limits and coverage
Statutory
Required Endorsements
The Workers’ Compensation policy shall contain a waiver of subrogation endorsement waiving all rights of subrogation against the County of Orange, its elected and appointed officials, officers, agents, and employees or provide blanket coverage, which will state As Required by Written Contract.

6. Employers Liability Insurance
Minimum limits and coverage
$1,000,000 per accident or disease
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 325 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 11 of 35 ends

File No. 2736403

ADDITIONAL TERMS AND CONDITIONS

1. Scope of Contract:

This Contract specifies contractual terms and conditions by which County will procure Trash and Debris Capture Devices from Contractor as further detailed in the Scope of Work, identified and incorporated herein by this reference as “Attachment A”.

2. Term of Contract:

This Contract shall commence upon execution of all necessary signatures and continue for five (5) calendar years from that date, unless otherwise terminated by County. This Contract may be renewed as set forth in the Article titled "Renewal" below.

3. Renewal:

This contract shall not be renewed unless otherwise approved by the County Board of Supervisors.

4. Aggregate Contract:

This is an Aggregate Contract with G2 Construction Inc. and United Storm Water, Inc. with an Aggregate Contract Amount not to exceed $25,000,000.

5. Adjustments – Scope of Work:

No adjustments made to the Scope of Work will be authorized without prior written approval of County assigned Deputy Purchasing Agent.

6. Bills and Liens:

Contractor shall pay promptly all indebtedness for labor, materials and equipment used in performance of the work. Contractor shall not permit any lien or charge to attach to the work or the premises, but if any does so attach, Contractor shall promptly procure its release and, in accordance with the requirements of Article “Indemnification” above, indemnify, defend, and hold County harmless and be responsible for payment of all costs, damages, penalties and expenses related to or arising from or related thereto.

7. Breach of Contract:

The failure of Contractor to comply with any of the provisions, covenants or conditions of this Contract shall be a material breach of this Contract. In such event County may, and in addition to any other remedies available at law, in equity, or otherwise specified in this Contract:
a. Terminate Contract immediately, pursuant to the General Terms and Conditions section, "Termination" Article herein;
b. Afford Contractor written notice of the breach and ten (10) calendar days or such shorter time that may be specified in this Contract within which to cure the breach; c. Discontinue payment to the Contactor for and during the period in which Contractor is in breach; and
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 326 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 12 of 35 ends

File No. 2736403
d. Offset against any monies billed by Contractor but yet unpaid by County those monies disallowed pursuant to the above.

8. Civil Rights:

Contractor attests that services provided shall be in accordance with the provisions of Title VI and Title VII of the Civil Rights Act of 1964, as amended, Section 504 of the Rehabilitation Act of 1973, as amended; the Age Discrimination Act of 1975 as amended; Title II of the Americans with Disabilities Act of 1990, and other applicable State and federal laws and regulations prohibiting discrimination on the basis of race, color, national origin, ethnic group identification, age, religion, marital status, sex or disability.

9. Conflict of Interest – Contractor’s Personnel:

Contractor shall exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict with the best interests of County. This obligation shall apply to Contractor; Contractor’s employees, agents, and subcontractors associated with accomplishing work and services hereunder.

Contractor’s efforts shall include, but not be limited to establishing precautions to prevent its employees, agents, and subcontractors from providing or offering gifts, entertainment, payments, loans or other considerations which could be deemed to influence or appear to influence County staff or elected officers from acting in the best interests of County.

10. Conflict of Interest – County Personnel:

County of Orange Board of Supervisors policy prohibits its employees from engaging in activities involving a conflict of interest. Contractor shall not, during the period of this Contract, employ any County employee for any purpose.

11. Contractor’s Project Manager and Key Personnel:

Contractor shall appoint a Project Manager to direct Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by County and shall not be changed without the written consent of County’s Project Manager, which consent shall not be unreasonably withheld.

Contractor’s Project Manager shall be assigned to this project for the duration of Contract and shall diligently pursue all work and services to meet the project time lines. County’s Project Manager shall have the right to require the removal and replacement of Contractor’s Project Manager from providing services to County under this Contract. County’s Project manager shall notify Contractor in writing of such action.

Contractor shall accomplish the removal within five (5) business days after written notice by County’s Project Manager. County’s Project Manager shall review and approve the appointment of the replacement for Contractor’s Project Manager. County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under Contract.

12. Contractor’s Expense:

The Contractor will be responsible for all costs related to photo copying, telephone communications, fax communications, and parking while on County sites during the performance of work and services under this Contract. The County will not provide free parking for any service in the County Civic Center.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 327 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 13 of 35 ends

File No. 2736403

13. Contractor Personnel – Uniform/Badges/Identification:

Contractor warrants that all persons employed to provide service under this Contract have satisfactory past work records indicating their ability to accept the kind of responsibility under this Contract. All Contractor’s employees shall be required to wear uniforms, badges, or other means of identification which are to be furnished by Contractor and must be work at all times while working on County property. The assigned Deputy Purchasing Agent must be notified in writing, within seven (7) days of notification of award of Contract of the uniform and/or badges and/or other identification to be worn by employees prior to beginning work and notified in writing seven (7) days prior to any changes in this procedure.

14. Contractor’s Records:

Contractor shall keep true and accurate accounts, records, books and data which shall correctly reflect the business transacted by Contractor in accordance with generally accepted accounting principles. These records shall be stored in Orange County for a period of three (3) years after final payment is received from County. Storage of records in another county will require written approval from County of Orange assigned Deputy Purchasing Agent.

15. Conditions Affecting Work:

Contractor shall be responsible for taking all steps reasonably necessary to ascertain the nature and location of the work to be performed under this Contract and to know the general conditions which can affect the work or the cost thereof. Any failure by Contractor to do so will not relieve Contractor from responsibility for successfully performing the work without additional cost to County. County assumes no responsibility for any understanding or representations concerning the nature, location(s) or general conditions made by any of its officers or agents prior to the execution of this Contract, unless such understanding or representations by County are expressly stated in Contract.

16. Cooperative Contract:

This Contract is a cooperative contract and may be utilized by all County of Orange departments.

The provisions and pricing of this Contract may be extended to any Municipal, County, Public Utility, Hospital, Educational Institution, or any other non-profit or governmental organization. Governmental entities wishing to use this contract will be responsible for issuing their own purchase documents / price agreements, providing for their own acceptance, and making any subsequent payments. Contractor shall be required to include in any Contract entered into with another agency or entity that is entered into as an extension of this Contract a Contract clause that will hold harmless the County of Orange from all claims, demands, actions or causes of actions of every kind resulting directly or indirectly, arising out of, or in any way connected with the use of this Contract. Failure to do so will be considered a material breach of this Contract and grounds for immediate Contract termination. The cooperative entities are responsible for obtaining all certificates of insurance and bonds required. The County of Orange makes no guarantee of usage by other users of this Contract.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 328 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 14 of 35 ends

File No. 2736403
A 2 percent rebate on Eligible Revenues will be paid to the County for any contracts the Contractor agrees to enter into with other entities under the provisions and pricing of this Contract. The Contractor shall provide quarterly Volume Sales Reports to the County about additional sales to other entities under the provisions and pricing of this Contract. The Reports shall include the ordering agency, detail of items sold including description, quantity, and price, and shall include all transactions pertaining to sales under the Contract provisions and pricing for that Reporting Period. Contractor shall provide the Volume Sales Reports regardless of whether or not any sales have been conducted. Failure of the Contractor to provide quarterly reports as required, may be deemed breach of the contract. A late penalty of 15 percent on the value of the rebate may be assessed to the Contractor for each month the payments are not received.

Subordinate contracts must be executed prior to the expiration or earlier termination of this Contract and may survive the expiration of this Contract up to a maximum of one year; however, in no case shall a subordinate contract exceed five (5) years in duration.

17. Data – Title To:

All materials, documents, data or information obtained from County data files or any County medium furnished to Contractor in the performance of this Contract will at all times remain the property of County.

Such data or information may not be used or copied for direct or indirect use by Contractor after completion or termination of this Contract without the express written consent of County. All materials, documents, data or information, including copies, must be returned to County at the end of this Contract.

18. Default – Re-Procurement Costs:

In case of Contract breach by Contractor, resulting in termination by County, County may procure the commodities and services from other sources. If the cost for those commodities and services is higher than under the terms of the existing Contract, Contractor will be responsible for paying County the difference between Contract cost and the price paid, and County may deduct this cost from any unpaid balance due Contractor. The price paid by County shall be the prevailing market price at the time such purchase is made.

This is in addition to any other remedies available under this Contract and under law.

19. Disputes – Contract:

The parties shall deal in good faith and attempt to resolve potential disputes informally. If the dispute concerning a question of fact arising under the terms of this Contract is not disposed of in a reasonable period of time by the Contractor’s Project Manager and the County‘s Project Manager, as specified in Article titled “Notices" below, such matter shall be brought to the attention of the County DPA by way of the following process:

A. The Contractor shall submit to the agency/department assigned Deputy Purchasing Agent a written demand for a final decision regarding the disposition of any dispute between the parties arising under, related to, or involving this Contract, unless County, on its own initiative, has already rendered such a final decision.

B. The Contractor’s written demand shall be fully supported by factual information, and, if such demand involves a cost adjustment to Contract, Contractor shall include with the demand a written statement signed by a senior official indicating that the demand is made in good faith, that the Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 329 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 15 of 35 ends

File No. 2736403
supporting data are accurate and complete, and that the amount requested accurately reflects Contract adjustment for which Contractor believes County is liable.

Pending the final resolution of any dispute arising under, related to, or involving this Contract, Contractor agrees to diligently proceed with the performance of this Contract, including the delivery of commodities and/or provision of services. Contractor’s failure to diligently proceed shall be considered a material breach of this Contract.

Any final decision of County shall be expressly identified as such, shall be in writing, and shall be signed by County Deputy Purchasing Agent or his designee. If County fails to render a decision within 90 days after receipt of Contractor’s demand, it shall be deemed a final decision adverse to Contractor’s contentions.

Nothing in this section shall be construed as affecting County’s right to terminate Contract for cause or termination for convenience as stated in Article "Termination" herein.

20. Drug-Free Workplace:

Contractor hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. Contractor will:

A. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a)(1).

B. Establish a drug-free awareness program as required by Government Code Section 8355(a)(2) to inform employees about all of the following:

1. The dangers of drug abuse in the workplace;

2. The organization's policy of maintaining a drug-free workplace

3. Any available counseling, rehabilitation and employee assistance programs; and

4. Penalties that may be imposed upon employees for drug abuse violations.

C. Provide as required by Government Code Section 8355(a)(3) that every employee who works under this Contract:

1. Will receive a copy of the company's drug-free policy statement; and

2. Will agree to abide by the terms of the company's statement as a condition of employment under this Contract.

D. Failure to comply with these requirements may result in suspension of payments under Contract or termination of Contract or both, and Contractor may be ineligible for award of any future County contracts if County determines that any of the following has occurred:

1. Contractor has made false certification, or

2. Contractor violates the certification by failing to carry out the requirements as noted above.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 330 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 16 of 35 ends

File No. 2736403

21. EDD Independent Contractor Reporting Requirements:

Effective January 1, 2001, County of Orange is required to file in accordance with subdivision (a) of Section 6041A of the Internal Revenue Code for services received from a “service provider” to whom County pays $600 or more or with whom County enters into a contract for $600 or more within a single calendar year.

The purpose of this reporting requirement is to increase child support collection by helping to locate parents who are delinquent in their child support obligations.

The term “service provider” is defined in California Unemployment Insurance Code Section 1088.8, subparagraph B.2 as “an individual who is not an employee of the service recipient for California purposes and who received compensation or executes a contract for services performed for that service recipient within or without the state.” The term is further defined by the California Employment Development Department to refer specifically to independent Contractors. An independent Contractor is defined as “an individual who is not an employee of the ... government entity for California purposes and who receives compensation or executes a contract for services performed for that ... government entity either in or outside of California.”
The reporting requirement does not apply to corporations, general partnerships, limited liability partnerships, and limited liability companies.

Additional information on this reporting requirement can be found at the California Employment Development Department website located at http://www.edd.ca.gov/Employer_Services.htm

22. Emergency/Declared Disaster Requirements:

In the event of an emergency or if Orange County is declared a disaster area by County, state or federal government, Contract may be subjected to unusual usage. Contractor shall service County during such an emergency or declared disaster under the same terms and conditions that apply during nonemergency/disaster conditions. The pricing quoted by Contractor shall apply to serving County’s needs regardless of the circumstances. If Contractor is unable to supply the goods/services under the terms of Contract, then Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from Contractor shall show both the emergency purchase order number and Contract number.

23. Error and Omissions:

All reports, files and other documents prepared and submitted by Contractor shall be complete and shall be carefully checked by the professional(s) identified by Contractor as Project Manager and key personnel attached hereto, prior to submission to the County. Contractor agrees that County review is discretionary, and Contractor shall not assume that the County will discover errors and/or omissions. If the County discovers any errors or omissions prior to approving Contractor’s reports, files and other written documents, the reports, files or documents will be returned to Contractor for correction. Should the County or others discover errors or omissions in the reports, files or other written documents submitted by the Contractor after County approval thereof, County approval of Contractor’s reports, files or documents shall not be used as a defense by Contractor in any action between the County and Contractor, and the reports, files or documents will be returned to Contractor for correction.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 331 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 17 of 35 ends

File No. 2736403

24. Equal Employment Opportunity:

Contractor shall comply with U.S. Executive Order 11246 entitled, “Equal Employment Opportunity” as amended by Executive Order 11375 and as supplemented in Department of Labor regulations (41 CFR, Part 60) and applicable state of California regulations as may now exist or be amended in the future.

Contractor shall not discriminate against any employee or applicant for employment on the basis of race, color, national origin, ancestry, religion, sex, marital status, political affiliation or physical or mental condition.

Regarding handicapped persons, Contractor will not discriminate against any employee or applicant for employment because of physical or mental handicap in regard to any position for which the employee or applicant for employment is qualified. Contractor agrees to provide equal opportunity to handicapped persons in employment or in advancement in employment or otherwise treat qualified handicapped individuals without discrimination based upon their physical or mental handicaps in all employment practices such as the following: employment, upgrading, promotions, transfers, recruitments, advertising, layoffs, terminations, rate of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor agrees to comply with the provisions of Sections 503 and 504 of the Rehabilitation Act of 1973, as amended, pertaining to prohibition of discrimination against qualified handicapped persons in all programs and/or activities as detailed in regulations signed by the Secretary of the Department of Health and Human Services effective June 3, 1977, and found in the Federal Register, Volume 42, No. 68 dated May 4, 1977, as may now exist or be amended in the future.

Regarding Americans with disabilities, Contractor agrees to comply with applicable provisions of Title 1 of the Americans with Disabilities Act enacted in 1990 as may now exist or be amended in the future.

25. Headings:

The various headings and numbers herein, the grouping of provisions of this Contract into separate clauses and articles, and the organization hereof are for the purpose of convenience only and shall not limit or otherwise affect the meaning hereof.

26. News/Information Release:

Contractor agrees that it will not issue any news releases in connection with either the award of this Contract or any subsequent amendment of or effort under this Contract without first obtaining review and written approval of said news releases from County through County’s Project Manager.

27. Notices:

Any and all notices, requests, demands and other communications contemplated, called for, permitted, or required to be given hereunder shall be in writing with a copy provided to the assigned DPA, except through the course of the Parties’ Project Managers’ routine exchange of information and cooperation during the terms of the work and services. Any written communications shall be deemed to have been duly given upon actual in-person delivery, if delivery is by direct hand, or upon delivery on the actual day of receipt or no greater than four (4) calendar days after being mailed by US certified or registered mail, return receipt requested, postage prepaid, whichever occurs first. The date of mailing shall count as the first day. All communications shall be addressed to the appropriate party at the address stated herein or such other address as the Parties hereto may designate by written notice from time to time in the manner aforesaid.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 332 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 18 of 35 ends

File No. 2736403
Contractor: G2 Construction Inc.

Attn: Eric Taylor
Address: 1352 E. Borchard Ave.

Santa Ana, CA 92705
Phone: 714-679-2550
Email: [email protected]
County's Project Manager: OC Public Works
Attn: Stephanie Gad
Address: 2301 N. Glassell St.

Orange, CA 92865
Phone: 714-955-0670
Email: [email protected]
cc: OCTA Environmental Cleanup Program (ECP) Manager
Attn: Alison Army
Address: 550 S. Main St.

Orange, CA 92868
Phone: 714-560-5537
Email: [email protected]
cc: OC Public Works/Procurement Services
Attn: Wayne Hsiao, County DPA
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 333 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 19 of 35 ends

File No. 2736403
Address: 601 North Ross Street
Santa Ana, CA 92701
Phone: (714) 667-9626
Email: [email protected]

28. Precedence:

Contract documents consist of this Contract and its exhibits and attachments. In the event of a conflict between or among Contract documents, the order of precedence shall be the provisions of the main body of this Contract, i.e., those provisions set forth in the recitals and articles of this Contract, and then the exhibits and attachments.

29. Subcontracting:

No performance of this Contract or any portion thereof may be subcontracted by Contractor without the express written consent of County. Any attempt by Contractor to subcontract any performance of this Contract without the express written consent of County shall be invalid and shall constitute a breach of this Contract.

In the event that the Contractor is authorized by the County to subcontract, this Contract shall take precedence over the terms of the Contract between Contractor and subcontractor, and shall incorporate by reference the terms of this Contract. The County shall look to the Contractor for performance and indemnification and not deal directly with any subcontractor. All work performed by a subcontractor must meet the approval of the County of Orange.

30. Termination – Orderly:

After receipt of a termination notice from County of Orange, Contractor may submit to County a termination claim, if applicable. Such claim shall be submitted promptly, but in no event later than 60 days from the effective date of the termination, unless one or more extensions in writing are granted by County upon written request of Contractor. Upon termination County agrees to pay Contractor for all services performed prior to termination which meet the requirements of Contract, provided, however, that such compensation combined with previously paid compensation shall not exceed the total compensation set forth in Contract. Upon termination or other expiration of this Contract, each party shall promptly return to the other party all papers, materials, and other properties of the other held by each for purposes of performance of Contract.

31. Usage:

No guarantee is given by County to Contractor regarding usage of this Contract. Usage figures, if provided, are approximations. Contractor agrees to supply services and/or commodities requested, as needed by County of Orange, at rates/prices listed in Contract, regardless of quantity requested.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 334 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 20 of 35 ends

File No. 2736403

32. Usage Reports:

Contractor shall submit usage reports on an annual basis to the assigned Deputy Purchasing Agent of County of Orange user agency/department. The usage report shall be in a format specified by the user agency/department and shall be submitted 90 days prior to the expiration date of Contract term, or any subsequent renewal term, if applicable.

33. Project Manager, County:

The County shall appoint a Project Manager to act as liaison between the County and the Contractor during the term of this Contract. The County’s Project Manager shall coordinate the activities of the County staff assigned to work with the Contractor.

The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager and key personnel. The County’s Project Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within three (3) business days after written notice from the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager and key personnel. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

34. Mandatory Kick-Off Meeting:

Upon award of the contract, the awarded vendor(s) may be required to attend a mandatory kick-off meeting with County representatives to discuss important information related to the scope of work, the contract, and the invoice payment process. A quarterly check-in meeting may be required to review any issues with the contract.

35. Prevailing Wage:

A. Prevailing Wage (Labor Code §1773): Pursuant to the provisions of Section 1773 et seq. of the California Labor Code, Contractor shall comply with the general prevailing rates of per diem wages and the general prevailing rates for holiday and overtime wages in this locality for each craft, classification, or type of worker needed to execute Contract. The rates are available from the Director of the Department of Industrial Relations at the following website: http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm. Contractor shall post a copy of such wage rates at the job site and shall pay the adopted prevailing wage rates. Contractor shall comply with the provisions of Sections 1775 and 1813 of the Labor Code.

B. Labor Code Requirements: Contractor and all Subcontractors shall comply with all applicable requirements of the Labor Code throughout the performance of Contract, including but not limited to the following:

C. Labor Code Notice: Contractor and all Subcontractors must comply with the requirements of Labor Code Section 1771.1(a), pertaining to registration of contractors pursuant to Section 1725.5.

Bids cannot be accepted from unregistered contractors except as provided in Section 1771.1. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 335 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 21 of 35 ends

File No. 2736403
Relations. After award of the Contract, Contractor and each Subcontractor shall furnish electronic payroll records directly to the Labor Commissioner in the manner specified in Labor Code Section 1771.4.

D. Threshold Requirements for Prevailing Wages: Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

E. Wage Rates: Contractor shall post a copy of the wage rates at the job site and shall pay the adopted prevailing wage rates as a minimum. Pursuant to the provisions of Section 1773 of the Labor Code of the State of California, the Board of Supervisors has obtained the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification, or type of workman needed to execute this Contract from the Director of the Department of Industrial Relations. These rates are on file with the Clerk of the Board of Supervisors. Copies may be obtained at cost at the office of County's OC Public Works/OC Facilities & Asset Management/A&E Project Management or visit the website of the Department of Industrial Relations, Prevailing Wage Unit at www.dir.ca.gov/DLSR/PWD. The Contractor shall comply with the provisions of Sections 1774, 1775, 1776 and 1813 of the Labor Code.

F. Apprenticeship Requirements: The Contractor shall comply with Section 230.1(A), California Code of Regulations as required by the Department of Industrial Relations, Division of Apprenticeship Standards by submitting DAS Form to the Joint Apprenticeship Committee of the craft or trade in the area of the site.

G. Registration of Contractor: All contractors and subcontractors must comply with the requirements of Labor Code Section 1771.1(a), pertaining to registration of contractors pursuant to Section 1725.5. Bids cannot be accepted from unregistered contractors except as provided in Section 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. After award of the contract, Contractor and each Subcontractor shall furnish electronic payroll records directly to the Labor Commissioner in the manner specified in Labor Code Section 1771.4.

H. Prevailing Wage and DIR Requirement: Awarding agencies are not required to submit the notice of contract award through DIR’s PWC-100 system on projects that fall within the small project exemption. The small project exemption applies for all public works projects that do not exceed:
• $25,000 for new construction, alteration, installation, demolition or repair • $15,000 for maintenance
If the project meets or exceeds these amounts, the County and the Contractor are required to register the project with the California Department of Industrial Relations.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 336 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 22 of 35 ends

File No. 2736403
I. Payroll Records: Contractor and any Subcontractor(s) shall comply with the requirements of Labor Code Section 1776. Such compliance includes the obligation to furnish the records specified in Section 1776 directly to the Labor Commissioner in an electronic format, or other format as specified by the Commissioner, in the manner provided by Labor Code Section 1771.4.

The requirements of Labor Code Section 1776 provide, in summary:

1. Contractor and any Subcontractor(s) performing any portion of the work under this Contract shall keep an accurate record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or any Subcontractor(s) in connection with the work.

2. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
a. The information contained in the payroll record is true and correct. b. The employer has complied with the requirements of Labor Code Sections 1771, 1811, and 1815 for any work performed by his or her employees in connection with the Contract.

3. The payroll records shall be certified and shall be available for inspection at the principal office of Contractor on the basis set forth in Labor Code Section 1776.

4. Contractor shall inform County of the location of the payroll records, including the street address, city and county, and shall, within five (5) working days, provide a notice of any change of location and address of the records.

5. Pursuant to Labor Code Section 1776, Contractor and any Subcontractor(s) shall have ten (10) days in which to provide a certified copy of the payroll records subsequent to receipt of a written notice requesting the records described herein. In the event that Contractor or any Subcontractor fails to comply within the ten (10) day period, he or she shall, as a penalty to County, forfeit one hundred dollars ($100), or a higher amount as provided by Section 1776, for each calendar day, or portion thereof, for each worker to whom the noncompliance pertains, until strict compliance is effectuated. Contractor acknowledges that, without limitation as to other remedies of enforcement available to County, upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement of the California Department of Industrial Relations, such penalties shall be withheld from progress payments then due Contractor. Contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.

6. Contractor and any Subcontractor(s) shall comply with the provisions of Labor Code Sections 1771 et seq., and shall pay workers employed on the Contract not less than the general prevailing rates of per diem wages and holiday and overtime wages as determined by the Director of Industrial Relations. Contractor shall post a copy of these wage rates at the job site for each craft, classification, or type of worker needed in the performance of this Contract, as well as any additional job site notices required by Labor Code Section 1771.4(b). Copies of these rates are on file at the principal office of County’s representative, or may be obtained Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 337 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 23 of 35 ends

File No. 2736403
from the State Office, Department of Industrial Relations (“DIR”) or from the DIR’s website at www.dir.ca.gov. If the Contract is federally funded, Contractor and any Subcontractor(s) shall not pay less than the higher of these rates or the rates determined by the United States Department of Labor.

36. Work Hour Penalty:

Eight (8) hours of labor constitute a legal day's work, and forty hours constitute a legal week's work.

Pursuant to Section 1813 of the Labor Code of the State of California, the Contractor shall forfeit to the County Twenty Five Dollars ($25) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than the legal day's or week's work, except that work performed by employees of said Contractor and subcontractors in excess of the legal limit shall be permitted without the foregoing penalty upon the payment of compensation to the workers for all hours worked in excess of eight (8) hours per day of not less than 1-1/2 times the basic rate of pay.

37. Wage Rate Penalty:

Contractor and any Subcontractor(s) shall comply with the provisions of Labor Code Section 1775.

Contractor and any Subcontractor(s) shall be subject to a penalty in an amount up to $200, or a higher amount as provided by Section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates for any work done by Contractor or Subcontractor(s) under Contract.

38. Apprentices:

The Contractor acknowledges and agrees that, if this Contract involves a dollar amount greater than or a number of working days greater than that specified in Labor Code Section 1777.5, this Contract is governed by the provisions of Labor Code Section 1777.5. It shall be the responsibility of the Contractor to ensure compliance with this Article and with Labor Code Section 1777.5 for all apprenticeable occupations.

Pursuant to Labor Code Section 1777.5 if that Section applies to this Contract as indicated above, the Contractor and any subcontractors under him employing workers in any apprenticeable craft or trade in performing any work under this Contract shall apply to the applicable joint apprenticeship committee for a certificate approving the Contractor or subcontractor under the applicable apprenticeship standards and fixing the ratio of apprentices to journeymen employed in performing the work. Pursuant to Labor Code Section 1777.5 if that Section applies to this Contract as indicated above, the Contractor and any subcontractor under him may be required to make contributions to the apprenticeship program. The Contractor and all subcontractors under him shall comply with Labor Code Section 1777.6 which Section forbids certain discriminatory practices in the employment of apprentices.

39. Safety Data Sheets (SDS):

The Contractor is required to provide a completed Safety Data Sheet (SDS) for each hazardous substance provided to the County under the Contractor’s Contract with the County. This includes hazardous substances that are not directly included in the Contract, but are included in the goods or services provided by the Contractor to the County. The provision of the SDSs must be in accordance with the requirements of California Labor Code Sections 6380 through 6399, General Industry Safety Order Section 5194, and Title 8, California Code of Regulations. The SDSs for each substance must be sent to the place of shipment or provision of goods/service.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 338 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 24 of 35 ends

File No. 2736403

40. Permits and Licenses:

Contractor shall be required to obtain any and all approvals, permits and/or licenses which may be required in connection with the permitted operation as set out herein. No permit approval or consent given hereunder by County in its governmental capacity shall affect or limit Contractor’s obligations hereunder, nor shall any approvals or consents given by County as a party to this Contract, be deemed approval as to compliance or conformance with applicable governmental codes, laws, ordinances, rules, or regulations.

41. Inventory:

County has an ongoing requirement for the commodities indicated in this Contract. Contractor shall maintain a reasonable stock on hand of all commodities for delivery upon request.

42. Order Dates:

Orders may be placed during the term of Contract even if delivery may not be made until after the term of Contract. Order dates take precedence over delivery dates. Contract must clearly identify the order date on all invoices to County.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 339 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 25 of 35 ends

File No. 2736403

SIGNATURE PAGE
IN WITNESS WHEREOF, the Parties hereto have executed this Contract on the date following their respective signatures.

G2 Construction Inc.*
Signature Name Title Date
Signature Name Title Date
COUNTY OF ORANGE, A political subdivision of the State of California COUNTY AUTHORIZED SIGNATURE:

Deputy Purchasing Agent
Signature Name Title Date
Approved as to form:

County Counsel
By:_______________________________________
Deputy
Name: ____________________________________
Date: _____________________________________
*If the contracting party is a corporation, (2) two signatures are required: one (1) signature by the Chairman of the Board, the President or any Vice President; and one (1) signature by the Secretary, any Assistant Secretary, the Chief Financial Officer or any Assistant Treasurer. The signature of one person alone is sufficient to bind a corporation, as long as he or she holds corporate offices in each of the two categories described above. For County purposes, proof of such dual office holding will be satisfied by having the individual sign the instrument twice, each time indicating his or her office that qualifies under the above described provision. In the alternative, a single corporate signature is acceptable when accompanied by a corporate resolution demonstrating the legal authority of the signee to bind the corporation.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 John R. Alvarado President 8/8/2025 | 5:17 PM EDT
Lydia G. Alvarado Secretary 8/8/2025 | 2:23 PM PDT
William Ninh
8/8/2025 | 2:30 PM PDT
Wayne Hsiao 8/8/2025 | 2:32 PM PDT
PAGE 340 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 26 of 35 ends

File No. 2736403

ATTACHMENT A - SCOPE OF WORK

1. Scope of Work
The Scope of Work is described as follows.

2. Background
The Orange County Transportation Authority’s (OCTA) Environmental Cleanup Program (ECP) provides a two percent allocation of annual gross Measure M2 (M2) revenues to improve overall water quality in Orange County from transportation-related pollution. The ECP competitive funds can be used to implement water quality improvement projects addressing pollutants originating from or conveyed through transportation systems. These funds will assist Orange County cities and the County of Orange in meeting federal Clean Water Act standards for urban runoff through the purchase and installation of recognized structural best management practices (BMPs). Third parties such as public water and wastewater agencies, environmental advocacy organizations, and homeowners associations may also nominate projects through a municipality that is willing and able to take responsibility for carrying out and maintaining the project.

3. Description of Project
In concert with the M2 Grant Program, this Scope of Work is designed to assemble a panel of Contractors to achieve economies of scale on a list of fixed unit prices for the purchase and installation of equipment and devices designed to remove litter, debris, and other water quality pollutants, herein referred to as “Stormwater Treatment Devices.” Selected Contractors will be part of a Master Agreement with the County of Orange that will allow municipalities to select from a listing of Contractors to provide, supply, fabricate, construct, deliver, and install Stormwater Treatment Devices. Municipalities wishing to use this Contract may purchase BMPs with M2 grant monies or any other funding source.

Accordingly, the goal of this Contract is to achieve strategic savings that would benefit the County and OCTA to act as the purchasing and contract administrators for M2 grant-eligible entities. Awarded ECP entities are not obligated to utilize the selected Contractors. Rather, this process is intended to provide a mechanism for reduced rates for equipment and its installation for Orange County municipalities, including those implementing projects with M2 funding. In addition, if a local agency utilizes this Contract, a separate agreement, city council resolution, or other protocol may be necessary with the selected Contractor(s). The eligible qualifications are discussed below.

4. Eligibility Qualifications
Stormwater Treatment Devices must be capable of handling flows from a design storm of 0.2-inches/hour.

The hydrologic method to be used to calculate the flow associated with LID and water quality design storm flow is:

Frequired = C × I × A
Where Frequired = Flow capacity (cubic feet/sec); C = runoff coefficient (ranges from 0 to 1); I = 0.2 inches/hour; and A = tributary area (acres).

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 341 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 27 of 35 ends

File No. 2736403
Treatment devices should also be able to operate in a hydraulic surcharge condition (defined as a condition that exceeds the design discharge) without releasing stored pollutants to the receiving water. Stormwater Treatment Devices which meet this definition and would be eligible for consideration are:

A. Hydrodynamic Separation and Gross Solids Removal Devices Hydrodynamic separators are flow-through structures with a settling or separation unit to remove sediments and other pollutants and are widely used in stormwater treatment. No outside power source is required, because the energy of the flowing water allows the sediments to efficiently separate. Depending on the type of unit, this separation may be by means of centrifugal force or indirect filtration.

Gross Solids Removal Devices (either linear radial or inclined screen) are structural best management practices designed to remove trash, vegetative material, and other particles of relatively large, gross size from stormwater runoff.

B. Catch Basin Inserts
Catch basin inserts are designed to remove oil and grease, trash, debris, and sediment and improve the efficiency of catch basins. Some inserts are designed to drop directly into existing catch basins, while others may require retrofit construction. Several varieties of catch basin inserts exist for filtering runoff.

C. Automatic Retractable Screens
Automatic retractable screens are mounted inside a storm drain inlet and are designed to remain closed to capture debris during the dry season. During storm events, the screens retract, allowing heavy flows to enter the storm drain.

D. Cartridge Filter-type Control Devices
Cartridge filter–type controls typically consist of a series of vertical filters contained in a vault or catch basin that provide treatment through filtration and sedimentation.

E. Biological Treatment Devices
Bioretention devices include raingardens, swales, and filter strips; all use plants and substrate to detain and filter stormwater to reduce excessive runoff from roads and paved surfaces, and provide opportunities for enhancing natural landscape and biodiversity elements in the urban environment.

F. In-line Trash and Debris Capture Devices (Trash Booms and Trash Nets) Trash booms and nets are designed to assist in the control, containment and recovery of floating trash, debris, timber, urban waste or aquatic plants. Typically built as floating structures, these devices are designed to control pollution along the surface of the water.

G. New, Emerging, or Alternative Trash and Debris Devices Upon request, the Contractor shall submit supplemental proposals for new, emerging, or alternative trash and debris removal devices reasonably related to the categories listed within Attachment A Section 4 and to meet the intent of Attachment A Section 3. Contractor must obtain written approval from the County and/or local agency designee prior to commencing any work for these new, emerging, or alternative trash and debris removal devices, which may include but not be limited to design, fabrication, and/or installation of these devices not already included in this scope of work. Upon completion of any work related to these devices, the local agency designee and Contractor will inspect the finished product at no Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 342 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 28 of 35 ends

File No. 2736403
additional cost. Upon mutual acceptance of the work product, the Contractor shall again be responsible for all services originally covered under this Contract and the work performed under this section.

5. Requirements
• The devices shall be ready for shipment, delivery and/or installation within two months of receipt of orders.
• Warranty on parts and labor shall be for a minimum of 10 years.

6. Equipment Design and Specifications Report
All proposals shall include information pertaining to the proposed stormwater treatment device, including, but not limited to: product description, design, engineering, siting, operation, and maintenance. The following information should be summarized in an Equipment Design and Specification Report (Report) for each proposed device in the given order as listed below.

A. Description/Design/Engineering
• Describe how the equipment meets the intent of the OCTA Tier 1 Environmental Cleanup Program.
• A detailed description of the equipment and design elements, inclusive of sizing and geometry (include diagrams or CAD files).
• Materials used to construct the equipment (i.e., stainless steel, grade, plastic, etc.). • Flow or range of flows for which equipment is rated (in cubic feet per second). • Estimated design life of the equipment.

B. Performance Effectiveness
• Performance effectiveness in reducing trash, litter, debris and other transportation related pollutants (percent reduction) and associated transportation related water quality impacts (include independent analyses if any).
• Trash capture (meeting the definition of “full capture system”) and storage capacity of the equipment (if applicable).
• Overflow or bypass flow capacity of the equipment when full of trash and overflowing (i.e., storage capacity of the equipment when the one-year, one hour storm is no longer fully filtered) (if applicable).
• Maximum overflow or bypass flow capacity of the device (i.e., 10-year storm event) (if applicable).
• Device performance effectiveness in terms of pounds of trash removed per total project cost (see section V., F.)
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 343 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 29 of 35 ends

File No. 2736403
C. Siting, Operation, and Maintenance
• Description of Contractor’s installation process including consultation and review of device locations with municipal staff, traffic control during installation, and estimated time required to install each device.
• Description of the site-specific measurements and other information a municipality must provide the Contractor for determining the appropriate size and configuration of the device for that location (i.e. Eligible entities will need to determine how to select the right device for their desired location).
• A discussion of any regulatory permits that may be required for installation. • Maintenance requirements (describe in detail how the device must be maintained and the approximate amount of time required for cleaning or maintenance. In addition, discuss whether the device has design capabilities for easy removal for cleaning or maintenance). • Estimated life cycle costs for maintenance.
• Durability against external factors, such as street sweeping, car parking, etc. • Availability of replacement parts and life expectancy. • Warranty coverage and duration.
• Aesthetics and safety.
• Any key factors that makes the device unique among other products.

D. Contractor’s Installation Background
• Ability of Contractor to have staff and/or subcontractor(s) to manufacture device and provide installation to eligible entities within Orange County. • Experience, background, training, and number of staff and/or subcontractor(s) who will fabricate and/or install device.

E. Operating Locations, References, and Certifications
• A minimum of three locations, inclusive of address or nearest intersection, and photos of device in operation within southern California, preferably Orange County. • References from three public agencies. (See Appendix A for Contractor’s Reference Forms). • Certifications obtained from public agencies and/or Regional Water Quality Control Boards.

7. Project Management, Coordination, and Administration A kick-off meeting with selected Contractors and the County shall be held to discuss the contractual terms of the Master Agreement. This will establish management, coordination, and administration protocols, and address other issues, as necessary, to ensure that the contractual terms are met. The Contractor’s Project Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 344 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 30 of 35 ends

File No. 2736403
Manager shall communicate and coordinate in a timely manner all work and progress with the County’s Project Manager.

A monthly progress report detailing the stormwater treatment device purchases and installation per local agency shall be prepared by the Contractor’s Project Manager and submitted to the County’s Project Manager.

Progress reports shall include the ongoing status of work, significant accomplishments, problems encountered and anticipated with potential solutions, and work planned for the next month (by task and responsible person). In addition, the Contractor will be responsible for developing a Tier 1 Program spreadsheet to capture information from awarded ECP entities. The database will contain the following:
• Name of Entity
• Contact Name
• Contact Phone Number
• Contact E-mail Address
• Date of Installation
• Device inventory number, name, and type
• Size/capacity of device
• Location of installations
• Best estimate of catchment area
• Anticipated number of installations within the next month The monthly progress report shall be received no later than the tenth (10th) calendar day of the month.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 345 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 31 of 35 ends

File No. 2736403

ATTACHMENT B - PAYMENT AND COMPENSATION

1. Compensation:

This is a firm fixed fee Contract between County and Contractor for Service Description as set forth in Attachment A, “Scope of Work”.

Contractor agrees to accept the specified compensation as set forth in this Contract as full payment for performing all services and furnishing all staffing and materials required, for any reasonably unforeseen difficulties which may arise or be encountered in the execution of the services until acceptance, for risks connected with the services, and for performance by Contractor of all its duties and obligations hereunder. Contractor shall only be compensated as set forth herein for work performed in accordance with the Scope of Work. County shall have no obligation to pay any sum in excess of the fixed rates specified herein unless authorized by amendment in accordance with Articles "Changes" and "Amendments" of County Contract Terms and Conditions, which may require approval by the County Board of Supervisors.

2. Fees and Charges:

A. County will pay the fees and charges in accordance with the provisions of this Contract.

Contractor guarantees that pricing is based on best information from Attachment A, “Scope of Work”. There are four areas for which pricing information needs to satisfy :

1. Estimated average cost of design and engineering for each type of equipment or device.

2. Estimated unit cost of equipment fabrication or cost of pre-fabricated device.

3. Estimated average cost of device installation, including labor and equipment (include separate line item for each type of device).

4. Estimated average annual life cycle cost of operation and maintenance for each type of device.

Device Type Design and
Engineering
Cost
Unit Cost of
Equipment
Fabrication
Average
Cost of
Device
Installation
Annual
Operation
and
Maintenance
Cost
Total Cost
CPS-Mod™ $268 $766 $442 $95 $1,571
GITS™ $343 $1,874 $286 $95 $2,598
ARS-CL™ $236 $1,069 $230 $80 $1,615
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 346 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 32 of 35 ends

File No. 2736403
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 347 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 33 of 35 ends

File No. 2736403
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 348 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 34 of 35 ends

File No. 2736403

3. Price Increase/Decreases:

No price increases will be considered during the first year of the Contract. County requires documented proof of cost increases on Contracts prior to any price adjustment. A minimum of 180-days advance notice in writing is required for consideration of such adjustment. No retroactive price adjustments will be considered. All price decreases will automatically be extended to County of Orange. County may enforce, negotiate, or cancel escalating price Contracts or take any other action it deems appropriate, as it sees fit. The net dollar amount of profit will remain firm during the period of Contract. Adjustments increasing Contractor’s profit will not be allowed.

4. Firm Discount and Pricing Structure:

Contractor guarantees that prices quoted are equal to or less than prices quoted to any other local, State or Federal government entity for services of equal or lesser scope. Contractor agrees that no price increases shall be passed along to County during the term of this Contract not otherwise specified and provided for within this Contract.

5. Contractor’s Expense:

Contractor will be responsible for all costs related to photo copying, telephone communications and fax communications while on County sites during the performance of work and services under this Contract.

6. Payment Terms – Payment in Arrears:

Invoices are to be submitted in arrears to the user agency/department to the ship-to address, unless otherwise directed in this Contract. Contractor shall reference Contract number on invoice. Payment will be net thirty (30) days after receipt of an invoice in a format acceptable to County of Orange and verified and approved by the agency/department and subject to routine processing requirements. The responsibility for providing an acceptable invoice rests with Contractor.

Billing shall cover services and/or goods not previously invoiced. Contractor shall reimburse County of Orange for any monies paid to Contractor for goods or services not provided or when goods or services do not meet Contract requirements.

Payments made by the County shall not preclude the right of the County from thereafter disputing any items or services involved or billed under this Contract and shall not be construed as acceptance of any part of the goods or services.

7. Taxpayer ID Number:

Contractor shall include its taxpayer ID number on all invoices submitted to County for payment to ensure compliance with IRS requirements and to expedite payment processing.

8. Payment – Invoicing Instructions:

Payment – Invoicing Instructions: The Contractor will provide an invoice on the Contractor’s letterhead for goods delivered and/or services rendered. In the case of goods, the Contractor will leave an invoice with each delivery. Each invoice will have a number and will include the following information:
a. Contractor’s name and address
Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 349 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices

Page 35 of 35 ends

File No. 2736403
b. Contractor’s remittance address, if different from “A” above c. Contractor’s Taxpayer ID Number
d. Name of County Agency/Department
e. Delivery/Service address
f. Contract Number MA-080-25011708
g. Agency/Department’s Account Number
h. Date of order
i. Product/Service description, quantity, and prices
j. Sales tax, if applicable
k. Freight/Delivery Charges, if applicable
l. Total
Invoices and support documentation are to be forwarded to:

OC Public Works
Attn: Accounts Payable
P.O. Box 4048
Santa Ana, CA 92702
Email: [email protected]

9. Payment (Electronic Funds Transfer (EFT):

County of Orange offers contractors the option of receiving payment directly to their bank account via an Electronic Fund Transfer (EFT) process in lieu of a check payment. Payment made via EFT will also receive an Electronic Remittance Advice with the payment details via e-mail. An e-mail address will need to be provided to The County of Orange via an EFT Authorization Form. To request a form, please contact the agency/department Procurement Buyer listed in Contract. Upon completion of the form, please mail, fax or email to the address or phone listed on the form.

Docusign Envelope ID: 66B81198-7190-4167-9EE0-14B72F061C12 PAGE 350 of 623
PAGE 351 of 623
PAGE 352 of 623
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Lizette Guerrero, Human Resources Director
DATE: September 26, 2025
SUBJECT: ADOPTION OF ORDINANCE NO. O-25-1422 (SECOND

READING) AN ORDINANCE OF THE SAN MARINO CITY
COUNCIL AMENDING SECTION 2.05.01 OF THE

MUNICIPAL CODE TO RESTATE INDIVIDUALS EXEMPT
FROM THE CITY’S CLASSIFIED SERVICE

STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Fiscally Responsible and Transparent City Government
Efficient, Responsive, and Effective City Services

BACKGROUND
At the September 10, 2025, City Council meeting, the Council unanimously introduced Ordinance No. O-25-1422 for a first reading. The Ordinance is attached for the Council’s consideration and adoption.

DISCUSSION
Currently, the City does not define which positions and offices are exempt from the Classified Service in its Municipal Code. Rather, the previous version for the Personnel Rules and Regulations stated that “All employees of the City of San Marino except those specified as unclassified or as management personnel” are in the City’s Classified Service. The new version of the Personnel Rules and Regulations, as adopted in Resolution No. R-25-24 (Attachment 1), provides clarity and specifically lists the positions and offices that are exempt from the Classified Service. This list does not change which positions and offices are exempt from the Classified Service, rather it is a mirror reflection of the City’s ongoing practice, consistent with the previous Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 353 of 623
definition in its prior version of the Personnel Rules and Regulations regarding the same.

However, to avoid ambiguity and confusion while implementing the newly revised Rules and any future revisions to the Personnel Rules and Regulations, staff recommends revising the Municipal Code, Chapter II, Article 5, Section

2.05.01 to clearly outline, in the Municipal Code, which positions and offices have been and are currently exempt from the Classified Service.

Chapter II, Article 5, Section 2.05.01 is amended to add subsection “E” to read as follows;
“E. Classified Service means the offices, positions and employments in the service of the City except the following: 1) Elected and appointed officers; 2) Members of appointed boards, commissions and committees; 3) Persons engaged under contract to supply expert, professional, or technical services for a definite period of time; 4) Volunteer personnel; 5) City Manager; 6) City Attorney; 7) Department Heads; and 8) Employees serving in hourly, temporary, provisional, part-time, or seasonal appointments.”

FISCAL IMPACT & PROCUREMENT REVIEW
There is no anticipated fiscal impact from the attached ordinance.

LEGAL REVIEW
The City Attorney's office has reviewed and approved as to form.

RECOMMENDATION
Staff recommends the Council adopt Ordinance No. O-25-1422, an Ordinance of the San Marino City Council amending Section 2.05.01 of the Municipal Code to clarify which offices, positions, and employments are exempt from the City’s Classified Service. If the City Council concurs with staff’s recommendation an appropriate motion would be:
“I move to approve Ordinance No. O-25-1422, an Ordinance of the San Marino City Council amending Section 2.05.01 of the Municipal Code to restate individuals exempt from the City’s Classified Service.”

ATTACHMENTS

1. Ordinance O-25-1422
PAGE 354 of 623
4886-2311-4998 v5 1
ORDINANCE NO. O-25-1422

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
SAN MARINO, CALIFORNIA, AMENDING SECTION 2.05.01

OF THE MUNICIPAL CODE TO RESTATE INDIVIDUALS
EXEMPT FROM THE CITY’S CLASSIFIED SERVICE
WHEREAS, the City’s current personnel rules and regulations define the Classified Service as “All employees of the City of San Marino except those specified as unclassified or as management personnel;”
WHEREAS, such definition is unintentionally vague and the City is clarifying the exemption from Classified Service in its newly drafted Personnel Rules and Regulations (“Rules”) as presented to the City Council in Resolution No. R-25-24 and WHEREAS, to formalize the City’s past and present practice as to which individuals are exempt from the Classified Service, the City is amending the Municipal Code as provided in Section 2 of this Ordinance.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MARINO DOES ORDAIN AS FOLLOWS:

SECTION 1. Recitals. The City Council of the City finds and declares that the recitals set forth above are true and correct and are incorporated herein by this reference.

SECTION 2. Amendment of the City of San Marino Municipal Code Section 2.05.01.

Chapter II, Article 5, Section 2.05.01 is amended to add subsection “E” to read as follows; “E. Classified Service means the offices, positions and employments in the service of the City except the following: 1) Elected and appointed officers; 2) Members of appointed boards, commissions and committees; 3) Persons engaged under contract to supply expert, professional, or technical services for a definite period of time; 4) Volunteer personnel; 5) City Manager; 6) City Attorney; 7) Department Heads; and 8) Employees serving in hourly, temporary, provisional, parttime, or seasonal appointments.” SECTION 3. Severability. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this ordinance, is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision will not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have adopted this ordinance, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.

SECTION 4. Publication. The City Clerk is directed to certify the adoption of this ordinance and cause it to be published in the manner required by law.

PAGE 355 of 623
2 PASSED, APPROVED, AND ADOPTED this 26th day of September, 2025. _____________________________

GRETCHEN SHEPHERD ROMEY
MAYOR
ATTEST:
__________________________________

ALISON WALKER

CITY CLERK
APPROVED AS TO FORM:
____________________________

JOSEPH MONTES

CITY ATTORNEY

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF SAN MARINO )
I HEREBY CERTIFY that the foregoing City of San Marino Ordinance No. O-25-1422 was introduced and read by title at a Regular Meeting of the San Marino City Council held on the 10th day of September, 2025, and was adopted on second reading at the Adjourned Regular Meeting of the City Council held on the 26th day of September 2025 by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
____________________________

ALISON WALKER

CITY CLERK
PAGE 356 of 623
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Amber Shah, Parks & Public Works Director/City Engineer DATE: September 26, 2025
SUBJECT: APPROVE RESOLUTION R-25-30 ADOPTING THE

UPDATED SEWER SYSTEM MANAGEMENT PLAN (SSMP)

IN COMPLIANCE WITH STATE WATER RESOURCES
CONTROL BOARD ORDER NO. 2022-0103-DWQ AND

AUTHORIZING THE LEGALLY RESPONSIBLE OFFICIAL TO

CERTIFY AND SUBMIT THE SSMP TO THE CALIFORNIA

STATE WATER RESOURCES CONTROL BOARD

STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Efficient, Responsive, and Effective City Services
Fiscally Responsible and Transparent City Government
Well-Maintained Infrastructure

BACKGROUND
In May 2006, the State Water Resources Control Board (SWRCB) adopted Order No. 2006-0003-DWQ, titled Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems. This Order established regulatory requirements for public wastewater collection systems with the primary goal of reducing the frequency and volume of sanitary sewer overflows statewide. Under the WDR, all public agencies in California that own or operate more than one (1) mile of sewer pipeline are subject to regulation and are required to develop a Sewer System Management Plan (SSMP) in accordance with the Order’s guidelines. The SSMP serves as a comprehensive guide for the effective operation, maintenance and long-term planning of the City’s sanitary sewer collection system.

Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 357 of 623
In December 2022, the SWRCB adopted Order No. 2022-0103-DWQ, which updates and supersedes the previous Order No. 2006-0003-DWQ and all amendments thereafter. As with the previous Order, it continues to mandate the adoption and maintenance of an SSMP as a central planning and compliance tool.

The City’s SSMP was last updated in 2019. In accordance with State requirements, the document must be updated at least once every six (6) years to remain compliant with current regulations and operational standards. City staff, in collaboration with Dudek, the City’s on-call stormwater and wastewater engineering consultant, prepared the 2025 SSMP Update to ensure the plan remains current, compliant and aligned with industry best practices.

To support the long-term sustainability of its sewer system, the City Council recently adopted sewer service charges for the first time. These charges provide a dedicated funding source for ongoing maintenance, rehabilitation, and capital improvements, reinforcing the City’s commitment to responsible infrastructure management and directly aligns with the goals and implementation strategies outlined in the SSMP.

DISCUSSION
The SSMP is a critical document that outlines the City’s approach to managing its wastewater collection system. It includes key components required by the SWRCB, including a Spill Emergency Response Plan (SERP) which details the City’s procedures for responding to sanitary sewer overflows (SSOs) and other emergency events. Beyond emergency response, effective management of the City’s sanitary sewer collection system includes:
• Implementing best practices to manage, operate, and maintain all components of the system, including sewer mains, lift stations and manholes
• Conducting routine maintenance, inspections, and condition assessments to ensure system reliability
• Maintaining adequate capacity to handle peak flows and minimize the risk and impact of sanitary sewer overflows (SSOs)
• Planning and prioritizing capital improvements to support long-term infrastructure sustainability
The primary goal of the SSMP is to protect water quality, reduce or eliminate preventable sanitary sewer overflows (SSOs), and safeguard public health and the environment. In addition to serving as a guide for best management practices, the adoption and recertification of the 2025 SSMP is required to PAGE 358 of 623
maintain compliance with State regulations. The updated SSMP reflects current regulatory standards and City operations and will serve as a working document to support staff in effective management of the sanitary sewer collection system over the coming years. In accordance with WDR requirements, the final 2025 SSMP must be formally approved by the City Council to complete the certification process.

FISCAL IMPACT & PROCUREMENT REVIEW
The FY 2025-26 budget includes $40,000 in Account No. 101-44-4104-0000 for contract engineering including the update of the SSMP. There are sufficient funds to complete this work.

There is no direct fiscal impact associated with the approval of the updated SSMP. Implementation of the Plan’s recommendations will be addressed through the City’s Capital Improvement Program and annual budget process.

Procurement review is not applicable.

LEGAL REVIEW
The City Attorney's office has reviewed and approved as to form.

RECOMMENDATION
Staff recommends the City Council approve Resolution R-25-30 adopting the 2025 Sewer System Management Plan (SSMP) Update and authorizing the Legally Responsible Official to certify and submit the SSMP to the State Water Resources Control Board. If Council concurs with staff’s recommendation, an appropriate motion would be:
“I move to approve Resolution R-25-30 adopting the updated Sewer System Management Plan (SSMP) in compliance with State Water Resources Control Board Order No. 2022-0103-DWQ and authorizing the Legally Responsible Official to certify and submit the SSMP to the California State Water Resources Control Board.”

ATTACHMENTS

1. Resolution R-25-30

2. 2025 Sewer System Management Plan Update
PAGE 359 of 623
RESOLUTION NO. R-25-30

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SAN MARINO, CALIFORNIA, ADOPTING THE

UPDATED SANITARY SEWER SYSTEM MANAGEMENT

PLAN (SSMP) IN COMPLIANCE WITH STATE WATER
RESOURCES CONTROL BOARD ORDER NO. 2022-0103-

DWQ AND AUTHORIZING THE LEGALLY RESPONSIBLE

OFFICIAL TO CERTIFY AND SUBMIT THE SSMP TO THE

CALIFORNIA STATE WATER RESOURCES CONTROL
BOARD
WHEREAS, on December 6, 2022, the California State Water Resources Control Board (“SWRCB”) adopted Order No. 2022-0103-DWQ, that updated the Statewide General Waste Discharge Requirements (“WDR”) for Sanitary Sewer Systems (the “Order”) which became effective on June 5, 2023; and
WHEREAS, all public agencies that own or operate sanitary sewer systems greater than one mile in length that collect and/or convey untreated or partially-treated wastewater to a publicly owned treatment facility in the State of California are required to comply with the terms of this Order; and
WHEREAS, the City of San Marino owns and operates a sanitary sewer system greater than one mile in length that is subject to the requirements of the Order; and WHEREAS, the Statewide General WDRs for Sanitary Sewer Systems require the City to develop, implement, and maintain a system-specific Sanitary Sewer Management Plan (“SSMP”) that complies with the provisions of the Order; and
WHEREAS, the City has prepared an updated SSMP that incorporates all required elements to be in full compliance with the requirements of the Order; and WHEREAS, the SSMP must be approved by the City Council and certified by a Legally Responsible Official (LRO) prior to submittal to the California Integrated Water Quality System (CIWQS) database;

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MARINO, CALIFORNIA, DOES HEREBY FIND, DETERMINE, AND RESOLVE AS FOLLOWS:

SECTION 1. The City Council hereby approves the updated Sanitary Sewer System Management Plan prepared in accordance with the requirements of State Water Resources Control Board Order No. 2022-0103-DWQ.

SECTION 2. The City Council authorizes the Parks and Public Works Director/City Engineer or designee, as the Legally Responsible Official, to certify and submit the approved SSMP to the CIWQS Sanitary Sewer System Database.

PAGE 360 of 623
CITY OF SAN MARINO RESOLUTION NO. R-25-30
PAGE 2 OF 2
SECTION 3. The City Council directs staff to implement the SSMP and update it as required by the Order, including audits every three years and revisions every six years or as otherwise required.

SECTION 4. That copies of this Resolution shall be filed in the offices of the City Manager, City Clerk, City Attorney, and Parks and Public Works Department SECTION 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED, at a Regular Meeting of the City Council of the City of San Marino, California, on this 26th day of September, 2025. ______________________________________

GRETCHEN SHEPHERD ROMEY
MAYOR
ATTEST:
__________________________________

ALISON WALKER

CITY CLERK

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SAN MARINO )
I, Alison Walker, City Clerk of the City of San Marino, California, hereby certify that Resolution No. R-25-30 was adopted by the City Council of the City of San Marino at a Regular Meeting held on the 26th day of September, 2025, and that the same was adopted by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
________________________________

ALISON WALKER

CITY CLERK
PAGE 361 of 623
City of San Marino
Sewer System Management Plan
California State Resources Control Board
City of San Marino Parks & Public Works Department
2200 Huntington Drive
San Marino, California 91108
Contact: Amber Shah, P.E.

September 2025
PAGE 362 of 623

INTENTIONALLY LEFT BLANK
PAGE 363 of 623
City of San Marino Sewer System Management Plan Page i
Table of Contents

SECTIONS
Acronyms and Abbreviations............................................................................................................................................................ iii Definitions............................................................................................................................................................................................ v Purpose and Background ................................................................................................................................................................. ix Elements of a SSMP.......................................................................................................................................................................... xi 1 SSMP Goal and Introduction......................................................................................................................................................1 2 Organization .................................................................................................................................................................................4 3 Legal Authority .............................................................................................................................................................................9 4 Operation and Maintenance Program..................................................................................................................................13 5 Design and Performance Provisions......................................................................................................................................17 6 Spill Emergency Response Plan.............................................................................................................................................19 7 Sewer Pipe Blockage Control Program.................................................................................................................................37 8 System Evaluation, Capacity Assurance, and Capital Improvements....................................................................................39 9 Monitoring, Measurement and Program Modifications......................................................................................................44 10 Internal Audits...........................................................................................................................................................................50 11 Communication Program.........................................................................................................................................................52 Appendix A.........................................................................................................................................................................................54 The Reissued WDR: Order Number WQ 2022-0103-DWQ.................................................................................................54 Appendix B........................................................................................................................................................................................56 Chapter 14.15 of the City’s Municipal Code.........................................................................................................................56 Appendix C ........................................................................................................................................................................................59 Chapter 16.03 of the City’s Municipal Code.........................................................................................................................59 Appendix D........................................................................................................................................................................................61 Chapter 16.06 of the City’s Municipal Code.........................................................................................................................61 Appendix E ........................................................................................................................................................................................63 Updated Sewer Collection System Map................................................................................................................................63 Appendix F.........................................................................................................................................................................................66 Notification Requirements ......................................................................................................................................................66 Appendix G........................................................................................................................................................................................70 Reporting Requirements .........................................................................................................................................................70 Appendix H........................................................................................................................................................................................82 Water Quality Monitoring Plan................................................................................................................................................82 Appendix I..........................................................................................................................................................................................84 Sewer System Management Plan Change Log ....................................................................................................................84 Appendix J.........................................................................................................................................................................................89 SSMP Monitoring Parameters ................................................................................................................................................89 PAGE 364 of 623
Table of Contents
City of San Marino Sewer System Management Plan Page ii

TABLE(S)
Table 1-1: SSMP Update Schedule ..................................................................................................................................................2 Table 1-2: Sewer System Assets.......................................................................................................................................................3 Table 1-3: Number of Service Connections.....................................................................................................................................3 Table 2-1: Key Staff Roles..................................................................................................................................................................6 Table 2-2: Department Roles & Responsibilities............................................................................................................................6 Table 2-3: Positions that Implement the City’s SSMP ...................................................................................................................6 Table 2-4: Contact Numbers for Chain of Communication...........................................................................................................8 Table 3-1: WDR Requirements.......................................................................................................................................................10 Table 6-1: Contact Numbers for Chain of Communication........................................................................................................21 Table 6.2: Active Contractor for Sewer System Repair...............................................................................................................22 Table 9-1: SSMP Update Schedule ...............................................................................................................................................44 Table 9-2: SSMP Monitoring Parameters, by SSMP Element....................................................................................................45 Table 9-3 Preventive Operation and Maintenance Activities to Track......................................................................................48 Table 9-4: Spill Trends from 2015 to 2024.................................................................................................................................48

FIGURES
Figure 2-1: Organizational Chart.......................................................................................................................................................5 Figure 2-2: Spill Response Chain of Communication ....................................................................................................................7 Figure 6-1: Spill Response Chain of Communication .................................................................................................................20 PAGE 365 of 623
City of San Marino Sewer System Management Plan Page iii Acronyms and Abbreviations
Abbreviation Acronym
BMP Best Management Practices
CCTV Closed-Circuit Television
CIP Capital Improvement Program
City City of San Marino
CIWQS California Integrated Water Quality System
CWEA California Water Environment Association
FOG Fats, Oils, & Grease
FSE Food service establishments
GIS Geographic Information System
GPS Global Positioning System
Greenbook Standard Publication for Public Works and Standard Plans for Public Works I&I Inflow & Infiltration
LACSD Los Angeles County Sanitation District
LRO Legally Responsible Official
NPDES National Pollutant Discharge Elimination System
O&M Operation and Maintenance
OES Office of Emergency Services (aka Cal OES)
Order SWRCB Order No. 2022-0103-DWQ adopted December 6, 2022 and effective June 5, 2023
PPWD Parks & Public Works Department
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisition
SERP Spill Emergency Response Plan
SSMP Sewer System Management Plan
SWRCB State Water Resources Control Board
WDID Waste Discharge Identification Number
WDR Waste Discharge Requirements, also referred to as the Sanitary Sewer Systems Waste Discharge Requirements (SSSWDR)
PAGE 366 of 623
Acronyms and Abbreviations
City of San Marino Sewer System Management Plan Page iv

INTENTIONALLY LEFT BLANK
PAGE 367 of 623
City of San Marino Sewer System Management Plan Page v
Definitions
Annual Report - A mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

California Integrated Water Quality System (CIWQS) - The statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter - An individual designated and authorized by the Enrollee’s Legally Responsible Official (LRO) to enter spill data into the online CIWQS Sanitary Sewer System Database. Data Submitters do not have the authority of an LRO to certify reports within the CIWQS Sanitary Sewer System Database.

Enrollee - A public, private, or other non-governmental entity that has obtained approval for regulatory coverage under the General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Exfiltration - The underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Governing Entity - A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board; • A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Lateral (including Lower and Upper Lateral) - An underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership. A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations. An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official - An official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by the General Order.

PAGE 368 of 623
Definitions
City of San Marino Sewer System Management Plan Page vi Nuisance - California Water Code Section 13050, subdivision (m), defines nuisance as anything which meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property. • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal. • Occurs during, or as a result of, the treatment or disposal of wastes.

Potential to Discharge, Potential Discharge - Any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

Receiving Water - A water of the State that receives a discharge of waste.

Sanitary sewer system - A system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of the Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System - A portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan - A living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with the General Order.

Sewage - Sewage and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill - A discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under the General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Spill Reporting System – Online spill reporting system that is hosted, controlled, and maintained by the State Water Board. The web address for this site is http://ciwqs.waterboards.ca.gov. This online database is maintained on a secure site and is controlled by unique usernames and passwords.

Training - In-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with the General Order.

Untreated or partially treated wastewater – Any volume of waste discharged from the sanitary sewer system upstream of a wastewater treatment plant headworks.

PAGE 369 of 623
Definitions
City of San Marino Sewer System Management Plan Page vii Waste - As defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID) – Number which identifies each individual sanitary sewer system enrolled under the General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State - Surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions. Waters of the State include waters of the United States.

Waters of the United States - Surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective - The limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

WDR – State Water Resources Control Board (SWRCB) Order No. 2022-0103-DWQ, known as the WASTE DISCHARGE REQUIREMENTS (WDR), which was adopted December 2, 2022 and became effective on June 5, 2023.

PAGE 370 of 623
Definitions
City of San Marino Sewer System Management Plan Page viii

INTENTIONALLY LEFT BLANK
PAGE 371 of 623
City of San Marino Sewer System Management Plan Page ix Purpose and Background
In December 2022, the State of California’s Water Resources Control Board (SWRCB) adopted Order Number WQ 2022-0103-DWQ that updated General WDRs for sanitary sewer systems designed to convey sewage greater than one (1) mile in length. The order became effective on June 5, 2023. This order supersedes the previous Order Number 2006-0003-DWQ and all amendments thereafter (i.e., Order No. WQ 2013-0058-EXEC). The WDR requires that all enrolled agencies develop a Sewer System Management Plan (SSMP) that describes the activities of the enrollee in managing, operating, and maintaining their sanitary sewer collection system. The purpose of the Order is to prevent sanitary sewer spills and to provide a plan and schedule for measures to be implemented for spill prevention including measures to effectively clean up and report spills. A copy of the reissued 2022 WDR is included in Appendix A.

The reissued WDR includes directives for owners and operators of sanitary sewer systems to demonstrate adequate and efficient management, operation, and maintenance of the sanitary sewer system. Generally, the WDR requires that:

In the event of a spill, all feasible steps are taken to control the released volume and prevent untreated wastewater from entering storm drains, creeks, etc.

If a spill occurs, it must be reported to the SWRCB using California Integrated Water Quality System (CIWQS), the online reporting system developed by the SWRCB.

An SSMP with all mandatory elements be developed and approved by the governing body that owns or is responsible for the operation of the sanitary sewer system. The SSMP must include provisions to provide proper and efficient management, operation, and maintenance of the sanitary sewer system.

Spills often contain high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygendemanding organic compounds, oil and grease and other pollutants. Spills may cause a public nuisance and/or a public health hazard particularly when raw untreated wastewater is discharged to areas with high public exposure, such as streets or surface waters used for drinking, fishing, or body contact recreation. Spills may pollute surface or ground waters, threaten public health, adversely affect aquatic life, and impair the recreational use and aesthetic enjoyment of surface waters.

Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), or excessive infiltration and inflow (I/I) which affect the likelihood of a spill. A proactive approach that requires agencies to ensure a system-wide operation, maintenance, and management plan is in place that will reduce the number and frequency of spills within the state.

This approach will in turn decrease the risk to human health and the environment caused by spills.

PAGE 372 of 623
Purpose and Background
City of San Marino Sewer System Management Plan Page x

INTENTIONALLY LEFT BLANK
PAGE 373 of 623
City of San Marino Sewer System Management Plan Page xi Elements of a SSMP
A Sewer System Management Plan (SSMP) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This SSMP may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a SSMP addressing the pertinent requirements is an enforceable component of the General Order. As specified in the General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective SSMP to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of the General Order.

The eleven (11) required SSMP Elements that must be included in an SSMP are as follows:

1. Sewer System Management Plan Goal and Introduction

2. Organization

3. Legal Authority

4. Operations and Maintenance Program

5. Design and Performance Provisions

6. Spill Emergency Response Plan

7. Sewer Pipe Blockage Control Plan

8. System Evaluation, Capacity Assurance, and Capital Improvements

9. Monitoring, Measurement and Program Modifications

10. Internal Audits

11. Communication Program
PAGE 374 of 623
Elements of a SSMP
City of San Marino Sewer System Management Plan Page xii

INTENTIONALLY LEFT BLANK
PAGE 375 of 623
City of San Marino Sewer System Management Plan Page 1
1 SSMP Goal and Introduction
This Sewer System Management Plan (SSMP) has been prepared in compliance with the requirements of the State Water Resources Control Board’s Order Number WQ 2022-0103-DWQ. This chapter includes a summary of the regulations that serve as the impetus for the development of this SSMP, update schedule for the City of San Marino’s (City) SSMP, and a brief overview of the City’s service area and sanitary sewer system.

Requirements:

D.1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION: The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur. The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context: The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.

1.2. Sewer System Management Plan Update Schedule: The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview: The Plan Introduction section must provide a description of the Enrolleeowned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons;
• Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and • Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s up-to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of the General Order’s Attachment D.

1.1 Regulatory Context
The City has implemented this SSMP in accordance with the requirements of the State Water Resources Control Board’s General Order. The City’s previous SSMP was written in 2019. The City plans to obtain approval of this PAGE 376 of 623
Element 1: SSMP Goal & Introduction
City of San Marino Sewer System Management Plan Page 2
SSMP Update by the City Council in 2025. The SSMP has been audited in 2024 in compliance with the State Water Resources Control Board’s regulations.

The WDR requires that the SSMP be updated and approved by the agency’s elected governing body every six (6) years after the date of its last Plan Update due date. In addition, the City is to conduct an internal audit every three (3) years of the SSMP in order to assess the City’s progress towards meeting the goals, objectives and requirements set forth in the SSMP. The due dates for the City’s SSMP and SSMP audits can be found here using the City’s WDID (4SSO10428): https://www.waterboards.ca.gov/water_issues/programs/sso/lookup/.

The SSMP along with all references in the document, self-audits, and the adoption documents approved by City Council will be kept on file at City offices, the City’s website and an entry will be made in the California Integrated Water Quality System (CIWQS) database when SSMP updates and audits are completed.

The City has a goal to effectively implement the SSMP, ensuring regular cleaning, CCTV inspections, condition assessments, and rehabilitation to properly maintain the sewer system.

1.2 Sewer System Management Plan Update Schedule
Table 1-1 shows important milestones and dates for the City to comply with the General Order in order to incorporate activities that shall prevent sewer spills.

Table 1-1: SSMP Update Schedule
Milestones Frequency Due DATES
Submit Annual Report Annually April 1st annually
Update System Mapping Monthly 3/1/2025, 4/1/2025, etc.

System Cleaning Entire system every 2 years 1/1/2026 for entire system CCTV Inspections Entire system every 2 years 1/1/2026 for entire system SSMP Focused Training Annually 1/1/2026, 1/1/2027,
1/1/2028, etc.

Update Equipment Inventory N/A N/A
Evaluate Design Criteria and
Construction Standards and
Specifications
3 years 8/2/2027 (next audit)
Evaluate Spill Emergency Response
Plan
As-needed1 8/2/2026
Evaluate Sewer Pipe Blockage
Control Program
3 years 8/2/2027 (next audit)
CIP Development 8 years 12/31/2027
Review SSMP and Update Change
Log
Annually 8/2/2026
SSMP Audit 3 years 8/2/2027
Evaluate Communication Program 3 years 8/2/2027 (next audit) SSMP Update 6 years 8/2/2031
Notes:
1 Per WDR Attachment D, Section 6, the SERP must be review annually and updated as needed.

PAGE 377 of 623
Element 1: SSMP Goal & Introduction
City of San Marino Sewer System Management Plan Page 3

1.3 Sewer System Asset Overview
The City of San Marino (City) is located in Los Angeles County in the San Gabriel Valley and is approximately 10 miles northeast of downtown Los Angeles in Southern California. The City is accessible via Interstates 110 and 210 as well as State Highway 134. The City’s area is approximately 3.8 square miles. The City’s population is approximately 12,000.

The City of San Marino owns and operates the sanitary sewer collection system within its service area. The City provides sewer service to most businesses and residents within the City. Table 1-2 documents the City’s sewer system assets, and Table 1-3 documents the number of service connections which connect into the City’s sewer system. General maintenance of the sanitary sewer collection system is performed by the City’s contractors.

The City maintains up-to-date mapping of its sanitary sewer system and storm drain system in its GIS database.

These maps show gravity line segments and manholes, pumping facilities, pressure pipes. Applicable stormwater conveyance facilities within the sewer system service area boundaries are not shown. Additional information on these maps is included in section 4.1 (Updated Map of Sanitary Sewer System).

Table 1-2: Sewer System Assets
City Assets Value
Total Length 50.2 miles
Length of Gravity Mainlines 50 miles
Length of Pressure Force Mains 909 feet
Number of Lift Stations 3
Number of Siphons 0
Structures Diverting Stormwater to the Sewer System NONE Data Management Systems GIS
WinCan
Sewer System Ownership and Operation Responsibilities
between Enrollee and Private Entities for Upper and Lower Sewer Laterals
Property owner is responsible for the lateral
from the connection to the sewer main to the
building.

Estimated Number or Percent of Residential, Commercial, and Industrial Service Connections
See Table 1-3
Unique Service Boundary Conditions and Challenge(s) City Limits Table 1-3: Number of Service Connections
Customer Class Service Connections
Single Family Residential 4,460
Multi-Family Residential 0
Commercial/Institutional 611
Industrial 0
Total Active Connections 5,071
PAGE 378 of 623
City of San Marino Sewer System Management Plan Page 4
2 Organization
This chapter describes the City’s organizational staffing responsible and integral for implementing the local Sewer System Management Plan.

Requirements:

D.2. ORGANIZATION: The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of the General Order;
• The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of Emergency Services.)

2.1 Name of Legally Responsible Official
The City’s Public Works Director, Amber Shah, serves as the City’s Legally Responsible Official (LRO) and oversees the management of the City’s sanitary sewer system. Her contact information is (626) 300-0787 (office) and [email protected]. The City’s backup LRO is the City Manager.

Currently, only the LRO is authorized to certify electronic spill reports submitted to the SWRCB.

The Public Works Department and the City’s contractors are responsible for implementing and maintaining all elements of this SSMP.

2.2 Department Organization
The organizational lines of authority for the City’s Parks & Public Works Department are indicated in Figure 2-1.

PAGE 379 of 623
Element 4: Operation and Maintenance Program
City of San Marino Sewer System Management Plan Page 5
Figure 2-1: Organizational Chart
PAGE 380 of 623
City of San Marino Sewer System Management Plan Page 6

2.3 Roles and Responsibilities
The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements are indicated in Table 2-1. The responsibilities for these roles are detailed in Table 2-2. The positions that implement the SSMP are detailed in Table 2-3.

Table 2-1: Key Staff Roles
Role Name Phone Number Email Address
Public Works Director Amber Shah 626-300-0787 [email protected] Public Works Manager Chris Gutierrez 626-300-0793 [email protected] Management Analyst Robert Bauman 626-300-0765 [email protected] Table 2-2: Department Roles & Responsibilities
Role Responsibilities
Public Works Director Supports the development of the Capital Improvement Program (CIP) budget and collaborates with consultants and contractors on the engineering design and implementation of sewer infrastructure projects.

Public Works Manager Oversees sewer maintenance operations by managing contractors and supervising internal maintenance staff.

Management Analyst Assists in developing the CIP budget and prepares required reports.

Community Engagement Director Supports public outreach on sewer-related information.

Table 2-3: Positions that Implement the City’s SSMP
SSMP Element [WDR Section No.] Position(s)
Legally Responsible Official (LRO) or
Duly Authorized Representative
[Section 5.1]
Public Works Director
Goals
[SSSWDR D.1]
Public Works Director
Organization
[SSSWDR D.2]
Public Works Director
Legal Authority
[SSSWDR D.3]
Public Works Director
Operation and Maintenance Program
[SSSWDR D.4]
Public Works Manager
Design and Performance Provisions
[SSSWDR D.5]
Public Works Director
Spill Emergency Response Program
[SSSWDR D.6]
Public Works Manager
Sewer Pipe Blockage Control Program
[SSSWDR D.7]
Public Works Manager
System Evaluation, Capacity
Assurance and Capital Improvements
[SSSWDR D.8]
Public Works Director
PAGE 381 of 623
Element 2: Organization
City of San Marino Sewer System Management Plan Page 7
Table 2-3: Positions that Implement the City’s SSMP
SSMP Element [WDR Section No.] Position(s)
Monitoring, Measurement, and
Program Modifications
[SSSWDR D.9]
Public Works Manager
SSMP Internal Audits
[SSSWDR D.10]
Public Works Director
Communication Program
[SSSWDR D.11]
Management Analyst
Funding
[SSSWDR D.8.4]
Management Analyst

2.4 Chain of Communication
The Order requires the chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. Figure 2-2 contains a flowchart depicting this chain of communication. Table 2-4 lists contact phone numbers for the parties included in the chain of communication.

Figure 2-2: Spill Response Chain of Communication
PAGE 382 of 623
Element 2: Organization
City of San Marino Sewer System Management Plan Page 8
Table 2-4: Contact Numbers for Chain of Communication
Contact Telephone Number
City Hall (626) 300-0700
Public Works Department (626) 300-0793
Police Department Dispatch Center (626) 300-0720
Premier Pipe Inc. (909) 297-4808
PAGE 383 of 623
City of San Marino Sewer System Management Plan Page 9
3 Legal Authority
This chapter describes the legal authority required to implement the SSMP plans and procedures.

Requirements:

D.3. LEGAL AUTHORITY: The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure;
• Require that sewer system components and connections be properly designed and constructed; • Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and • Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

3.1 Compliance Documents
Supporting information for Element 3 is included in Appendices B and C. These appendices include the following documents:

1. Chapter 14.15 (Fats, Oils, and Greases) of the City Municipal Code (Appendix B)

2. Chapter 16.03 (Street Improvements under Private Contract) of the City Municipal Code (Appendix C)

3. Chapter 16.06 (Connection to Public Sewers) of the City Municipal Code (Appendix D)

3.1.1 Municipal Code
The legal authority required for the SSMP by the SWRCB is contained within the City’s Municipal Code. (https://codelibrary.amlegal.com/codes/sanmarinoca/latest/sanmarino_ca/0-0-0-1)

3.2 Compliance Summary
The City’s legal authority to operate and maintain its sanitary sewer collection system is within the City Municipal Code. The WDR requires that the City have the legal authority in the areas shown in Table 3-1.

PAGE 384 of 623
Element 3: Legal Authority
City of San Marino Sewer System Management Plan Page 10 Table 3-1: WDR Requirements
Legal Authority Order Requirements Applicable Sections of the City Municipal Code a. Prevent illicit discharges into its sanitary sewer
system from inflow and infiltration
(I&I); unauthorized stormwater; chemical
dumping; unauthorized debris; roots; fats,
oils, and grease; and trash, including rags and
other debris that may cause
blockages
• Section 14.15.05 restricts discharge into a
sewer connection of anything that may cause
stoppage, plugging, breakage or reduction of
sewer capacity, such as fats, oils, greases, or
liquid wastes of any kind.
b. Collaborate with storm sewer agencies to
coordinate emergency spill responses,
ensure access to storm sewer systems during
spill events, and prevent unintentional cross
connections of sanitary sewer infrastructure to
storm sewer infrastructure
• Not relevant; the City’s sewer and storm staff
are all under the same Streets Maintenance
Division at the City and therefore sewer staff
are also well informed of the storm drain
system.
c. Require that sewer system components and
connections be properly designed and
constructed
• Section 14.15.02 & .03 apply to grease
interceptor requirements & standards
• Section 16.06.01 requires connections to
public sewers to be approved and supervised by
the City
• Sections 16.02.02 & 16.04.01 requires a
permit for any construction or excavation in the
public right of way
d. Ensure access for maintenance, inspection,
and/or repairs for portions of the service lateral
owned and/or operated by the Enrollee
• Section 14.15.03 requires that fats, oil and
grease (FOG) disposal systems be installed in
areas that are easily accessible for inspection.
• Section 16.03.05 allows for supervision and
inspection of any improvements during and
after construction
e. Enforce any violation of its sewer ordinances,
service agreements, or other legally binding
procedures
• Section 1.06 allows for enforcement of all
violations listed in the Municipal Code
f. Obtain easement accessibility agreements for
locations requiring sewer system
operations and maintenance, as applicable
• Sections 16.01.01 & 16.03.05 allow for
supervision and inspection of any
improvements during and after construction

3.2.1 Prevention of Illicit Discharges
All measures prohibiting illicit discharges are included in Section 14.15 of the City’s Municipal Code. The specific purpose of the chapter is to prevent the discharge of any pollutant into the sewers that would obstruct or damage the collection system, interfere with treatment, or threaten harm to human health or the environment. • Section 14.15.05 restricts discharge into a sewer connection of anything that may cause stoppage, plugging, breakage or reduction of sewer capacity, such as fats, oils, greases, or liquid wastes of any kind.

PAGE 385 of 623
Element 3: Legal Authority
City of San Marino Sewer System Management Plan Page 11

3.2.2 Storm Water Agency Collaboration
The maintenance staff for the City’s sewer and storm systems are under the same Street Maintenance Division at the City and therefore all staff are well informed of both the sewer and storm drain systems. This enables a unified collaboration and flow of information between staff members. Communication and training with all staff ensure they know their part in responding to spills and recognizing areas at risk, develop strategies in containing and preventing spills, and reduce risks of cross contamination. Additionally, the City’s personnel maintain knowledge of the locations of storm water collection facilities that are nearby sewer facilities.

Installation of sewer and storm water facilities are coordinated to prevent unintentional cross connections. To ensure that cross-connections between the City’s sanitary sewer and storm drain systems do not occur, the City maintains records of the alignments of both systems and when they were constructed.

No connections to either system are allowed without a permit being first obtained from the City’s Public Works Department.

All connections to either system are inspected by the Street Foreman and the Public Works Manager to ensure that the connection is made in accordance with established standards.

3.2.3 Proper Design and Construction of Sewers and Connections Regulations pertaining to the design, construction, and inspection of private sewer systems, building sewers, and connections are included in Chapter 13 of the City’s Municipal Code.

Permit Required - A permit is required prior to construction of any private sewage disposal system (plumbing code).

A permit is also required prior to constructing a building or lateral sewer or connecting to a public sewer as discussed in Chapter 16 of the City’s Municipal Code. The permit application may include review of plans and specifications by the City.
• Sections 16.02.02 & 16.04.01 requires a permit for any construction or excavation in the public right of way
• Section 16.06.01 requires connections to public sewers to be approved and supervised by the City • Section 14.15.02 & .03 apply to grease interceptor requirements & standards

3.2.4 Lateral Maintenance Access
Property owners are responsible for maintaining the house lateral to the connection at the sewer main per Chapters 14 & 16 of the City’s Municipal Code. Standard Drawings require a cleanout at the property line. • Section 14.15.03 requires that FOG disposal systems be installed in areas that are easily accessible for inspection.
• Section 16.03.05 allows for supervision and inspection of any improvements during and after construction

3.2.5 Enforcement Measures
Chapter 1 and Section 16.02.08 permits the enforcement of sewer provisions. Written notice is provided to persons in violation, with a time limit for correction. Further enforcement provisions include declaration of a public nuisance and disconnection from public sewers. The person in violation is liable to the city for expense, loss, or damage resulting from the violation.

PAGE 386 of 623
Element 3: Legal Authority
City of San Marino Sewer System Management Plan Page 12 • Section 1.06 allows for enforcement of all violations listed in the Municipal Code • Sectio 16.02.08 grants the City power to cancel a permit

3.2.6 Easement Accessibility Agreements
Sections 16.03.05 & 16.01.01 allow for supervision and inspection of any improvements during and after construction PAGE 387 of 623
City of San Marino Sewer System Management Plan Page 13 4 Operation and
Maintenance Program
This chapter describes the City’s ability to properly manage, operate, and maintain all parts of the sanitary sewer system owned and operated by the City, and that the system operators (including employees, contractors, or other agents) are adequately trained and possess adequate knowledge, skills, and abilities.

Requirements:

D.4. OPERATION AND MAINTENANCE PROGRAM: The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System: An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities: A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes. The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training: In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of the General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory: An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

PAGE 388 of 623
Element 4: Operation and Maintenance Program
City of San Marino Sewer System Management Plan Page 14

4.1 Updated Map of Sanitary Sewer System
The City has created a comprehensive, customized, electronic based Geographic Information System (GIS) sewer collection system map, showing all pipeline segments and manholes within the City’s jurisdictional boundary. Both digital and hard copy versions are maintained, with printed maps stored at the Parks & Public Works Department (PPWD). Additionally, each maintenance vehicle is equipped with printed maps showing the sewer collection system, including pipes, manholes, and pump stations.

Currently, the City does not have a formal process for regularly updating the GIS when new assets are added or existing ones are replaced. Over the past four years, there have been minimal changes to the sewer system assets.

The City will prioritize maintaining an up-to-date GIS by ensuring timely updates when assets are added, modified, or abandoned.

Maintenance crews utilize both GIS and hard copy maps for accessing sewer line information. The City’s current sewer maintenance contractor, Premier Pipe, documents maintenance activities such as repairs, cleanings, and work order history using WinCan software. In July 2025, during the renewal of its contract with Premier Pipe, the City gained full access to WinCan, allowing staff to directly view detailed work order histories. City personnel will receive training on the WinCan platform to ensure effective use and understanding.

The City is responsible for maintaining the stormwater system and does have access to maps of the nearby storm water inlets and pipelines, as these are City-owned facilities.

The City will provide State and Regional Water Board staff with access to the map(s) through submitting the sewer geodatabase to the State and Regional Water Boards as well as including the map within this SSMP Update, which will be submitted to CIWQS once a year. An updated map of the sewer collection system is included in Appendix E.

4.2 Preventive Operation and Maintenance Activities
The City currently relies on their contractors for preventive operation and maintenance activities. This includes periodic cleaning, regular CCTV inspection, and chemical dosing.

4.2.1 Sewer Cleaning & CCTV Inspection
The City currently contracts Premier Pipe to perform preventative maintenance on the sewer collection system.

Under this agreement, the contractor cleans approximately half of the system each year and cleans Enhanced Maintenance Areas (EMAs) on a semiannual basis (every six months). Additionally, Premier Pipe conducts CCTV inspections of half the entire system every two years. Starting in July 2025, the City gained direct access to the contractor’s Wincan software, allowing staff to retrieve CCTV inspection data independently, without needing to request it from the contractor.

When issues are identified during CCTV inspections, they are evaluated and scored using Pipeline Assessment Certification Program (PACP) standards. These scores are stored in the City’s database and used to guide future wastewater condition assessments and updates to the CIP list.

The City plans on implementing a formal procedure for managing Grade 5 pipelines, which are identified through CCTV inspections as having severe structural defects. These pipelines pose a high risk of failure due to the extent of the damage, making timely and consistent action essential. Pipes classified as Grade 5, indicating severe defects, are prioritized for timely repair to prevent potential failure. Moving forward, upon identification of a Grade PAGE 389 of 623
Element 4: Operation and Maintenance Program
City of San Marino Sewer System Management Plan Page 15 5 pipeline, the City will assign a repair deadline ranging from six months to one year. Coordination with Premier Pipe or another designated contractor will ensure that repairs are completed within this timeframe. All Grade 5 pipelines will be maintained in a separate database and monitored regularly to track progress and ensure accountability.

When severe pipeline defects are identified and require emergency repair, Premier Pipe immediately addresses and fixes these defects.

In addition to routine maintenance and emergency repairs, Premier Pipe is responsible for root treatment and emergency repairs within the sewer system. Although the City does not currently track the annual footage of pipeline treated for roots, this service is performed as needed. The contractor, Golden Bell, also applies chemical treatments to manholes to control cockroach infestations, treating approximately half of the City’s manholes each year.

4.2.2 Lift Station Maintenance
The City’s Operations staff does weekly monitoring of the City’s pump stations to assure that they are operating properly. This team consists of four staff members, organized into two crews. All three of the City’s sewer lift stations are maintained through an ongoing contract with Gemini to perform maintenance on all three lift stations, each of which is equipped with a backup generator to ensure continued operation during power outages. Gemini is available 24 hours a day to service the pump stations as needed.

4.2.3 Odor Control
The City has received approximately five odor complaints annually, most of which are investigated and addressed.

Investigations have found that odors typically originate from County trunk lines, especially during extended hot weather.

Upon receiving a complaint, operations staff inspect the line. If a blockage is found, the contractor is called to flush and CCTV inspect the line. Any defects such as sags, cracks, or offsets are flagged and are added to the permanent repair list.

4.2.4 Corrosion Control
Over 87 percent of the pipe material in the City’s collection system is vitrified clay pipe (VCP), which is inert and does not need corrosion control. The remaining portion of the collection system is concrete pipe, cast iron pipe (CIP), or ductile iron pipe (DIP) which is not inert and does need corrosion control. To prevent corrosion, the City undertakes numerous relining projects as part of the Capital Improvement Program.

4.2.5 Investigation of Customer Complaints
The City promptly addresses customer complaints about the sewer system, which are typically related to sewer back-ups. The contractor responds immediately by conducting CCTV inspections of the lines and making necessary repairs to the affected sections or manholes. This response involves assessing the complaint and resolving the issue efficiently.

4.2.6 Data Collection
The City’s contractor, Premier Pipe, currently documents their cleanings and CCTV inspections electronically using WinCan software. With the City now having full access to WinCan, staff can review digital records of these activities.

PAGE 390 of 623
Element 4: Operation and Maintenance Program
City of San Marino Sewer System Management Plan Page 16 This access will also support the City in monitoring system deficiencies by identifying recurring issues based on complaints, field inspections, and CCTV inspection results.

4.3 Training
The City utilizes a variety of training methods for its staff, including in-house classes, on-the-job training, and conferences. The PPWD conducts weekly tailgate meeting, monthly safety meetings, annual SERP trainings, and provides training manuals for various O&M activities. To ensure the sewer system is properly maintained, the City will continuously review its training program. The City is planning on performing annual meetings to review sections of the SSMP. The City will continue to implement training on the Spill Emergency Response Plan procedures and practice drills, skilled estimation of spill volume for field operators, and electronic CIWQS reporting procedures for staff submitting data.

Currently, the City’s active CIP contractor does not conduct formal SERP or SSMP training. The City plans to include formal SERP and SSMP training to its renewed contract with the active contractor.

The City is committed to all trainings being documented and the records kept readily accessible.

4.4 Equipment Inventory
The City’s contractors, Premier Pipe and Gemini, are responsible for maintaining their equipment in proper working condition and ensuring the availability of necessary backup supplies, including spill response equipment. Each contractor is also responsible for maintaining an up-to-date inventory.

PAGE 391 of 623
City of San Marino Sewer System Management Plan Page 17 5 Design and Performance Provisions
This chapter references the design and construction standards & specifications for new sewer systems, pump stations, and other appurtenances, and for the rehabilitation and repair of existing sewer systems. Also included are the procedures and standards for the inspection and testing of these facilities.

Requirements:

D.5. DESIGN AND PERFORMANCE PROVISIONS: The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications: Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in the General Order section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of the General Order’s Attachment D, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards: Procedures and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

5.1 Updated Design Criteria and Construction
Standards and Specifications
The City utilizes the current edition of the Standard Publication for Public Works and Standard Plans for Public Works (Greenbook) and LACDPW’s Private Contract Sanitary Sewer Procedural Manual to provide design and performance provisions.

All City-owned public sewer mains and pump stations are designed by the City-hired consultant and constructed by the City-hired contractor. The City currently maintains on-call contracts with engineering firms for design of construction and rehabilitation related projects. Under these contracts, all projects are designed by a Professional Engineer registered in the State of California. The City ensures that all Contractors working on projects are licensed and insured.

5.2 Procedures and Standards
The City maintains that their sewer system pipelines, pumps, and other equipment and appurtenances are installed, tested, inspected, repaired, and rehabilitated according to the current Greenbook standards.

PAGE 392 of 623
Element 5: Design and Performance Provisions
City of San Marino Sewer System Management Plan Page 18

INTENTIONALLY LEFT BLANK
PAGE 393 of 623
City of San Marino Sewer System Management Plan Page 19 6 Spill Emergency Response Plan
This chapter provides an overview and summary of the City’s spill response, detection, mitigation, clean up, investigation, documentation, and reporting.

Requirements:

D.6. SPILL EMERGENCY RESPONSE PLAN: The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of the General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in the General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

6.1 Background
The City of San Marino (City) Parks and Public Works Department (PPWD) operates and maintains its own sanitary collection system. The City’s sanitary collection system consists of approximately 50 miles of gravity pipelines, serving PAGE 394 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 20 most parcels within the City’s 3.8 square mile City limits. The City’s wastewater collection system conveys untreated wastewater to Los Angeles County Sanitation District’s (LACSD) trunk sewer system via 197 separate connections.

The City of San Marino collection system is subject to regulation and permitted under the General Order WQ 2022- 0103-DWQ and is identified under WDID 4SSO10428. The City will annually review and assess the effectiveness of the Spill Emergency Response Plan (SERP) and update as necessary.

Note: During the 11-year period extending from January 1, 2013 to December 31, 2023, the City experienced zero (0) spills from within its sanitary sewer collection system.

6.2 Chain of Communication
The Order requires the chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. Figure 1 contains a flowchart depicting this chain of communication. Table 1 lists contact phone numbers for the parties included in the chain of communication.

Figure 6-1: Spill Response Chain of Communication
PAGE 395 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 21 Table 6-1: Contact Numbers for Chain of Communication
Contact Telephone Number
City Hall (626) 300-0700
Public Works Department (626) 300-0793
Police Department Dispatch Center (626) 300-0720
Premier Pipe Inc. (909) 297-4808

6.3 Known Collection System Problems
The following are currently known collection system problems within the City’s system:

1. Heavy root intrusion

2. Old and deteriorated pipes and manholes

3. Manhole base erosion

4. Manhole cover failures

5. Cracks and fractures throughout sewer mains

6.4 Causes of Sewer Backups
The following are currently known causes for sewer backups within the City’s system:

1. Heavy root intrusion

2. Pipe collapse

3. Construction material failures

4. Manhole cover failures

5. Structural failures

6. Concrete infiltration caused by Contractors

6.5 Preventative Maintenance
Refer to Section 4.2 of this SSMP for the City’s preventative maintenance program.

6.6 Spill Detection
Detection of a sanitary sewer spill may occur in numerous ways:

1. If an outside party calls in to report a spill, the Public Works Manager or his designee shall be notified immediately.
a. If this occurs after hours, the caller is directed to the Police Dispatch who will notify the on-call personnel.

2. The Public Works Manager, or his/her designee, upon determining that the sewer problem is the City's responsibility, will mobilize necessary City personnel and equipment to the spill location and contact the City's sewer maintenance services contractor for emergency service.

3. City personnel shall attempt to limit the spread of sewage by safe and appropriate means.

4. If the spill is contained within private property and is the responsibility of the private party. City personnel PAGE 396 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 22 shall assist the responsible private property owner in contacting a qualified contractor to remove the waste material from their property.

5. City personnel involved in the Sewer Spill Response shall forward a report of the incident to their department head. The report shall detail the cause of the spill, actions taken to limit the spill, damage caused by the spill and action taken to remove the waste.

6. The Public Works Division Manager, or his/her designee, shall report the spill event to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services).

Section 6.2 of this Spill Emergency Response Plan details the chain of communication for reporting spills and contact numbers for these points of contact.

Pre-planned coordination and collaboration with the City’s stormwater staff will be implemented prior, during, and after a spill event.

6.7 Initial Spill Response

6.7.1 Site Assessment
City staff shall investigate and assess the site conditions where the spill occurred using the following methods:

1. Determine the Category of the spill. (Refer to Section 6.9, Spill Categories)

2. Determine the size and extent of the spill.

3. Determine any potential hazards, such as vehicle and pedestrian traffic.

4. Identify receiving water that may be impacted by spill.

5. Document and record all pertinent information of the spill.

6. Implement traffic control measures as needed per the WATCH Manual. Should you need traffic or crowd control assistance, call police dispatch at (626) 300-0720 to assist with street closure, traffic diversion, or crowd control.

7. Post warning signs and block contaminated areas with yellow caution tape and/or barricades if spill poses a public threat or it has or will reach Waters of the State.

8. If spill location calls for it, the Public Works Manager will contact the Public Works Director to arrange for a partial activation of the Emergency Operations Center (EOC).

6.7.2 Containment Procedures
Containment of the spill is the top priority. City staff respond initially to spill calls and perform spill containment until the City’s pipeline contractor arrives to correct blockages, perform spill recovery and any necessary emergency repairs. The City’s current pipeline contractor with contact information are listed in this section by the City and are noted below in Table 6.2:

Table 6.2: Active Contractor for Sewer System Repair
Contractor Premier Pipe, Inc (909) 297-4808
PAGE 397 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 23 The City’s crew will attempt to keep the spill in as small an area as possible. If reasonable, the crew should attempt to keep the spill in the street and out of the storm drain or other surface water bodies. To ensure the spill is contained, the crew will use the following methods:

1. Contain the spill immediately. Contain sewage on the ground using a manmade berm if applicable.

2. Isolate, contain, and/or divert sewage flow from any open channels and storm drain structures using sandbags, inflatable dams, or soil barriers. Sandbags or absorbent material can be used around the spill to collect the sewage and prevent it from spreading.

3. Block the storm drain openings or divert flow with sandbags and plastic sheets, which are available at several locations around the City. If reasonable, keep the flow contained on the street. Pay special attention to blocking storm drain inlets of any kind, both downstream and upstream of the spill. Setup traffic control per the WATCH Manual. Should you need traffic or crowd control assistance, call police dispatch at (626) 300-0720.

4. Should the spill take place in an area not normally accessible to the public (i.e. field, etc.) the crew will use any reasonable means to pool the flow in that area for recovery.

5. Capture the spill.
a. If necessary, berm flow and start pumping into the closest clear and flowing manhole. b. Contact the Public Works Manager at 626-300-0793. If he/she cannot be reached, the Foreman will contact the Public Works Director at 626-300-0787. c. Evaluate the sewer system spill rate. The most senior employee on scene will evaluate the spill rate.

6. Determine the source and/or cause of the spill (i.e., evaluate type and amount of debris, illegal activities, etc.). City staff may need to observe downstream manholes to establish the location of the cause of the spill such as a blockage.

7. Clear the obstruction and restore flow.
i. Restore system flow by hydro jetting, rodding, open cut excavating, or any other means to clear the blockage or failure point.
ii. If necessary, City Staff should set up a hydro jetter downstream of the blockage and jet upstream from a clear manhole.
b. Capture as much of the material causing the blockage as possible. c. If unable to relieve the blockage, request immediate assistance from additional staff and appropriate equipment.
d. If still unable to clear the blockage, request immediate assistance with the establishment of bypass pumping and CCTV support to determine the problem. e. If engineering consultation is necessary, contact the Public Works Manager (or Public Works Director if he/she cannot be reached). He/she shall initiate an emergency work order to the City’s on-call contractor to repair the pipe.
f. Ensure the downstream manholes are clear and flowing.

8. Should the flow be too much to be contained in the street and is identified as a danger to the public the crew will allow the flow to enter the storm drain or catch basin. The crew will plug upstream and downstream portions of impacted storm drains or catch basins and recover it from that point.

9. Upon determining and correcting the source and/or cause of the spill, a sample of the sewage may be taken as evidence for possible analysis.

10. All sewage shall be captured and discharged into the closest clear and flowing manhole. Any contaminated materials unfit for the sewer and likely to cause blockages shall be transported to a local landfill for ultimate disposal. See Section 6.8 for treatment in dry or wet weather conditions and collection instructions.

11. Estimate volume of the spill as detailed in Section 6.14.2.

PAGE 398 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 24

12. Notify regulatory agencies about the spill and follow any additional instructions they may have.

6.7.3 Sewer Bypassing
If the spill involves damage to a pipeline and a by-pass is necessary:

1. By-pass action is to be administered, as soon as conditions safely allow, by City personnel at the location where the damaged pipeline occurs.

2. Place appropriate pumps and hoses to keep sewage in the sewerline. If additional pumps and piping or hoses are required to conduct a by-pass, a list of equipment rental companies and contractors with contact information will be developed and listed in this section by the City. The current equipment rental company and active contractor is listed below in Table 6.3:

Table 6.3: Equipment Rental Companies and Contractors for Spill Response Equipment Rental Stemar Equipment (213) 625-0185
Contractor Premier Pipe, Inc (909) 297-4808

3. Perform repairs to the damaged sewerline as soon as conditions safely allow and as resources are available.

4. If engineering consultation is necessary, the City has a list of On-Call Engineering Firms. Table 6.4 lists the City’s On-Call General Civil Engineering Firm(s):

Table 6.4: On-Call General Civil Engineering Firms
On-Call Engineering Firms Phone
Dudek (760) 942-5147

6.8 Recovery and Clean-Up (Mitigation)

1. If the spill occurs during dry weather conditions:
a. Once the spill has been eliminated, use rakes, brooms, and other applicable tools to scrape up and remove all solids and debris.
b. Any remaining standing sewage shall be vacuum pumped and discharged into the closest manhole (ensure it is clear and flowing).
c. Any contaminated soil shall have free standing sewage or water vacuumed up, lime applied, allowed to dry, and then removed (as necessary) by means of heavy equipment and transported to a local landfill for ultimate disposal.
d. Any contaminated structures such as streets, sidewalks, buildings, etc., shall be disinfected by pressure spraying with a 25 ppm sodium hypochlorite (liquid bleach) solution. After providing a contact time of 1 hour, the disinfected structures shall be rinsed with city water, and the wash water vacuumed and disposed of into the closest manhole (ensure it is clear and flowing). i. BEFORE PRESSURE WASHING CONTAMINATED AREA, ALL CONTAMINATED MATERIALS PAGE 399 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 25 AND CONTAMINATED SOIL MUST BE REMOVED AND CATCH BASINS MUST BE BLOCKED.

VACUUM MUST BE READY TO PICK UP WATER FROM PRESSURE WASHING. No water, sewage, bleach, or containment materials are to be washed into the storm drain system. ii. If the spill occurred in a heavily populated area or is within 100 feet of surface water, bleach should not be used.
e. If wastewater enters the storm drain or catch basin, a vactor truck may be used to vacuum the sump at a downstream catch basin, while clean water is used to flush the curb, gutter, and pipe upstream.
f. Leave the area as clean as possible picking up rags, papers, etc. Emphasis should be placed on removing all materials that are on or around the contaminated area. g. Restore the area to its original condition, or as close as possible. h. Documentation and recording of all pertinent information of the spill shall be completed prior to leaving the site.

2. If the spill occurs during wet weather conditions:
a. Once the spill has been eliminated, use rakes, brooms, and other applicable tools to scrape up and remove all solids and debris.
b. Any remaining standing sewage shall be vacuum pumped and discharged into the closest clear and flowing manhole.
c. Any contaminated soil shall have free standing sewage or water vacuumed up, lime applied, allowed to either dry or sit for an hour, and then removed (as necessary) by means of heavy equipment and transported to a local landfill for ultimate disposal. i. Omit lime application during heavy storm events with heavy runoff, where the surface water cannot be contained.
d. Any contaminated structures such as streets, sidewalks, buildings, etc., shall be cleaned with clean water. Avoid using bleach during wet weather as the bleach can harm the environment. e. If wastewater enters the storm drain or catch basin, a vactor truck may be used to vacuum the sump at a downstream catch basin, while clean water is used to flush the curb, gutter, and pipe upstream.
f. Leave the area as clean as possible picking up rags, papers, etc. Emphasis should be placed on removing all materials that are on or around the contaminated area. g. Restore the area to its original condition, or as close as possible. h. Documentation and recording of all pertinent information of the spill shall be completed prior to leaving the site.
i. If a spill is caused by lack of capacity during wet weather conditions, document the storm event and forward information to the Public Works Manager.

6.9 Spill Categories
Per the Reissued WDR, there are now four (4) categories of spills. Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:

PAGE 400 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 26

6.9.1 Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
• A surface water, including a surface water body that contains no flow or volume of water; or • A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Note: Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City will report all Category 1 spills per Appendices A and B of this document.

6.9.2 Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill.

6.9.3 Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.

6.9.4 Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

6.10 Summary of Notification, Reporting, Monitoring,
and Recordkeeping Requirements
The following tables provide a summary of notification, monitoring, reporting, and recordkeeping requirements, by spill category, and for City-owned laterals, for quick reference purposes only.

PAGE 401 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 27

6.10.1 Notification and Reporting Requirements
Table 2: Spill Category 1: Spills to Surface Waters
1 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 2 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a Category 1 spill of 1,000 gallons or greater, discharging or
threatening to discharge to surface waters:

Notify the California Office of Emergency Services and
obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, San Marino Police Department,
San Marino Public Works Director, LA County Public
Health, and Caltrans District 7 (if applicable).
• Call Cal OES at:
(800) 852-7550
• Call or email RWQCB Region
4 at:
(213) 576-6600 or rb4-
[email protected]
• Call San Marino Police
Department at:
(626) 300-0720
• Call San Marino Public Works
Director at:
(626) 300-0787
• Call LA County Public Health
at:
(888) 700-9995
• Call Caltrans District 7 (if
applicable)
(213) 897-3656
See Appendix F.

REPORTING • Submit Draft Spill Report within three (3)
business days of the City’s knowledge of the spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date;
• Submit Technical Report within 45 calendar days
after the spill end date for a Category 1 spill in
which 50,000 gallons or greater discharged to
surface waters; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.

Enter data into the online CIWQS
Sanitary Sewer System Database1
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)2.

See Appendix G, Section G-1.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the receiving
water within 18 hours of initial knowledge of spill
of 50,000 gallons or greater to surface waters.

Water quality records shall be
maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

PAGE 402 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 28 Table 3: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters 3 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 4 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied upon
to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 6.16.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a Category 2 spill of 1,000 gallons or greater, discharging or
threatening to discharge to waters of the State:

Notify California Office of Emergency Services and obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, San Marino Police Department,
San Marino Public Works Director, LA County Public Health, and Caltrans District 7 (if applicable).
• Call or email RWQCB Region
4 at:
(213) 576-6600 or rb4-
[email protected]
• Call San Marino Police
Department at:
(626) 300-0720
• Call San Marino Public
Works Director at:
(626) 300-0787
• Call LA County Public Health
at:
(888) 700-9995
• Call Caltrans District 7 (if
applicable)
(213) 897-3656
See Appendix F.

REPORTING • Submit Draft Spill Report within three (3) business days of the City’s knowledge of the spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.

Enter data into the online CIWQS
Sanitary Sewer System Database3
(http://ciwqs.waterboards.ca.gov/
), certified by the Legally
Responsible Official(s)4.

See Appendix G, Section G-2.

PAGE 403 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 29 Table 4: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
5 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 6 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied upon
to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or
upon request.

See Section 6.16.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Not Applicable Not Applicable
REPORTING • Submit monthly Certified Spill Report to the online CIWQS Sanitary Sewer System Database within 30
calendars days after the end of the month in which
the spills occur; and
• Submit Amended Spill Reports within 90 calendar
days after the Certified Spill Report due date.

Enter data into the online CIWQS
Sanitary Sewer System Database5
(http://ciwqs.waterboards.ca.gov
/), certified by the Legally
Responsible Official(s)6.

See Appendix G, Sections G-3 and
G-5.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied upon
to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or
upon request.

See Section 6.16.

PAGE 404 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 30 Table 5: Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Table 6: City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters 7 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 8 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
NOTIFICATION Not Applicable Not Applicable
REPORTING • If, during any calendar month, Category 4 spills occur, certify monthly, the estimated total spill
volume exiting the sanitary sewer system, and the
total number of all Category 4 spills into the online
CIWQS Sanitary Sewer System Database, within 30
days after the end of the calendar month in which
the spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.

Enter data into the online CIWQS
Sanitary Sewer System Database7
(http://ciwqs.waterboards.ca.gov
/), certified by the Legally
Responsible Official(s)8.

See Appendix F, Sections G-4, G-6,
and G-7.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

RECORD

KEEPING
• Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied upon
to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or
upon request.

See Section 6.16.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a spill of 1,000 gallons or greater, from a City- owned and/or
operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and obtain a notification control number.

Within 24 hours:
• Call Cal OES at:
(800) 852-7550
• Call or email RWQCB Region
4 at: (213) 576-6600 or
rb4-
[email protected]
• Call San Marino Police
Department at:
(626) 300-0720
• Call San Marino Public
PAGE 405 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 31

6.11 Notification
Appendix F of this SSMP details the notification requirements for reporting spills.

6.12 Reporting
Appendix G of this SSMP details the reporting requirements for spills. 9 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 10 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
Notify RWQCB Region 4, San Marino Police Department,
San Marino Public Works Director, LA County Public Health, and Caltrans District 7 (if applicable).

Not applicable to a spill of less than 1,000 gallons.

Works Director at:
(626) 300-0787
• Call LA County Public Health
at: (888) 700-9995
• Call Caltrans District 7 (if
applicable)
(213) 897-3656
See Appendix F.

REPORTING • Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not
discharge to a surface water) to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.
• Report a lateral spill of any volume that
discharges to a surface water as a Category 1
spill.

Enter data into the online CIWQS
Sanitary Sewer System Database9
(http://ciwqs.waterboards.ca.gov/
), certified by the Legally
Responsible Official(s)10.

See Appendix G, Sections G-6 and
G-7.

WATER QUALITY

MONITORING
• Conduct visual monitoring. Water quality records shall be maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

RECORD

KEEPING
• Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied upon
to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or
upon request.

See Section 6.16.

PAGE 406 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 32

6.13 Monitoring
The City’s Sewer Spill Monitoring Plan is included in Appendix H. This plan will be implemented immediately upon discovery of any Category 1 sewage spill in which an estimated 50,000 gallons or greater are discharged into a surface water.

6.14 Spill-Specific Monitoring Requirements

6.14.1 Spill Location and Spread
The City shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The City shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.
o For multiple appearance points of a single spill event, the points closest to the spill origin. • Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

6.14.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the City shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The City utilizes direct measurement based on container volume as well as dipstick measurements. The City plans to identify a spill volume estimation technique for larger spills volumes, which will be included in the Change Log when identified. The City shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

6.15 Public Access and Warning

1. Post warning signs at the site for the public to stay out of the area and block contaminated areas with yellow caution tape and/or barricades if spill poses a public threat or it has or will reach Waters of the State.

2. Use traffic cones, barricades, or warning tape to limit pedestrian and vehicle traffic access to affected areas.

3. If the spill discharges into surface waters or Waters of the State, closures shall occur 100 feet upstream and downstream of the spill, unless regulatory agencies provide alternative instructions. Signage shall occur at the discharge point, upstream, and downstream of the spill.

4. Warning signs and other public notices shall remain in effect until there is no further risk to public health and the environment.

5. The City’s Community Engagement Manager, part of the City’s Public Information Office through the City Manager’s Office, is to communicate to the public.

PAGE 407 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 33

6.16 Investigation and Documentation
For each spill, the City is to:

1. Determine the Category of the spill.

2. Determine the size and extent of the spill.

3. Determine any potential hazards, such as vehicle and pedestrian traffic.

4. Identify receiving water that may be impacted by spill.

5. Document and recording all pertinent information of the spill.

6. Determine the cause of the spill

7. Document findings of the investigation on the Department Incident Report and Sewer Spill Report Form (included in Appendix D of the individual SERP).

8. Determine what, if any, necessary repairs are needed.

9. Budget and schedule repairs, if required.

6.16.1 Recordkeeping Requirements
The City shall maintain records to document compliance with the provisions of the General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by a City’s contractor(s).

6.16.1.1 Recordkeeping Time Period
The City shall maintain records of this Spill Emergency Response Plan for five (5) years.

6.16.1.2 Availability of Documents
The City shall make the records readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

6.16.1.3 Spill Reports
The City shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the City responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
a. Date, time, and method of notification,
b. Date and time the complainant first noticed the spill, if available, c. Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available, d. Complainant’s contact information, if available, and e. Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the City, using all available information
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and PAGE 408 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 34 • Records, in accordance with the Monitoring Requirements, once developed.

6.16.2 Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills
The City must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 City-owned and/or operated lateral spill, and report in accordance with Appendix F section F-6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills).

6.16.2.1 Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
a. Description of drainage conveyance system location,
b. Estimated spill volume fully recovered within the drainage conveyance system, and c. Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:
a. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

6.16.2.2 Recordkeeping of Individual Lateral Spill Information:

1. Date and time the City was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

6.16.2.3 Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
a. Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, PAGE 409 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 35 as applicable, and
b. System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

6.16.3 Sewer System Telemetry Records
The City shall maintain the following sewer system telemetry records if used to document compliance with the General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes; • Computerized maintenance management system records; and • Asset management-related records.

6.16.4 Sewer System Management Plan Implementation Records The City shall maintain records documenting the City’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

6.16.5 Audit Records
The City shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, which includes this Spill Emergency Response Plan, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and • Follow-up actions based on audit findings.

6.16.6 Equipment Records
The City shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

6.16.7 Work Orders
The City shall maintain record of work orders for operations and maintenance projects.

6.17 Post Spill Assessment
After a spill, the City is to assess their spill response. The City is to analyze:
• The cause of the spill;
• Average and maximum response time;
• Percent of total spill volume contained or returned to sewer; • Compliance with notification, monitoring, and reporting requirements; PAGE 410 of 623
Element 6: Spill Emergency Response Plan
City of San Marino Sewer System Management Plan Page 36 • Public Notification; and
• What repairs were performed.

This assessment is to be used to update the Spill Emergency Response Plan as necessary and to conduct additional training where needed.

6.18 Annual Review
The City is to annually review and assess the effectiveness of the Spill Emergency Response Plan. Updates to the Spill Emergency Response Plan should be made as necessary based on this review.

6.19 Annual Report
Section G-8 of Appendix G of this SSMP details the reporting requirements for the City’s Annual Report.

The City shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of the General Order, for each calendar year (January 1 through December 31).

6.20 Spill Response Equipment
The City does not own their own spill response equipment. Rather, the City contacts one of its contractors listed in Section

6.7 to provide spill equipment when necessary.

6.21 Training
Training is conducted through the City of San Marino’s Parks and Public Works Department. Staff and contractors are appropriately trained on the Spill Emergency Response Plan procedures and practice drills. The City plans on implementing training with staff from sewer and storm to know their part in responding to spills and recognizing areas at risk, develop strategies in containing and preventing spills, and reduce risks of cross contamination.

6.22 SERP Change Log
Any changes made to the SERP will be documented in the Change Log in Appendix I. The City will use this log to document changes and maintain up to date information about the SERP.

PAGE 411 of 623
City of San Marino Sewer System Management Plan Page 37 7 Sewer Pipe Blockage
Control Program
This chapter discusses the City’s sewer pipe blockage control measures, including identification of problem areas, focused cleaning, and source control.

Requirements:

D.7. SEWER PIPE BLOCKAGE CONTROL PROGRAM: The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed. The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements;
• Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

The City implements a Sewer Pipe Blockage Control Program, which aims to prevent the discharge of fats, oils, grease, rags, and debris into the sanitary sewer and storm drain systems. The program also aims to prevent spills and illegal discharge into the storm drain, subsequently improving public health and safety and reducing sewer maintenance costs.

Over the last 10 years (2015-2024), there have been zero (0) spills total, and therefore zero (0) spills have been attributed to fats, oils, grease, rags, and debris. The City uses CCTV inspection to identify and monitor preventative maintenance areas that are likely sources of FOG into the sewer system. These areas are cleaned at least every 6 months.

PAGE 412 of 623
Element 7: Sewer Pipe Blockage Control Program
City of San Marino Sewer System Management Plan Page 38 Chapter 14, Article 15 (Fats, Oils, and Greases) of the City Municipal Code provides the legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages. This ordinance also provides guidance on installation and enforcement of grease interceptors.

All new restaurants are required to install a grease interceptor and must receive approval of the design of the grease interceptor by the Engineering Department and/or the San Marino Planning & Building Department through a plan checking procedure. In efforts to standardize the installation of FOG removal devices, the City has created materials on best management practices (BMPs), maintenance requirements, and design standards for the installation of grease removal devices (interceptors/traps) for FOG-producing facilities, all based on the California Plumbing Code.

Additionally, the City requires food service establishments (FSEs) to maintain a grease trap or interceptor cleaning log as part of its permitting program. The City does not provide a list of grease haulers to private businesses or private owners; it is the responsibility of these parties to hire a licensed grease hauler as needed.

LA County Public Health is responsible for performing FSE inspections. These inspections are done one to two times per year, depending on the capacity of the restaurant.

The City recently added educational materials on proper FOG disposal to the Streets, Sidewalks, & Sewer Maintenance section of its website.

PAGE 413 of 623
City of San Marino Sewer System Management Plan Page 39 8 System Evaluation, Capacity
Assurance, and Capital Improvements
This chapter discusses the City’s capacity management measures, including the most recent Master Plan and recommended capacity improvement projects.

Requirements:

D.8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS: The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment: The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available; • Identify and justify the amount (percentage) of its system for its condition to be assessed each year; • Prioritize the condition assessment of system areas that:
a. Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
b. Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas;
c. Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria: The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; PAGE 414 of 623
Element 8: System Evaluation, Capacity Assurance, and Capital Improvements City of San Marino Sewer System Management Plan Page 40 • The appropriate design storm(s) or wet weather events that causes or contributes to spill events; • The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information;
• Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change;
• Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action: The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan: The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program; • Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

8.1 System Evaluation and Condition Assessment
The City conducted its most recent wastewater system condition assessment in 2018-2019, covering 20 miles of its 50-mile system. The report included a review of CCTV inspection footage and observations at pump stations to evaluate the system’s condition and identify necessary improvements. A list of Capital Improvement Program (CIP) projects was developed, along with associated costs. This assessment recommended that the City evaluate the remaining 30 miles to complete a full system review. The City plans on schedule and budget for this in the future.

Currently, the City’s contractor performs scheduled CCTV inspections to meet their schedule of CCTV inspecting the entire system every 2 years. If a non-urgent problem is identified in the CCTV inspection by the contractor, this is sent to the Engineering Department so it can be added to a list of flagged pipe segments and efforts are made to schedule their repair over time. If the repairs are not done before the next wastewater condition assessment report, they are then added to the new CIP list, including Grade 5 pipelines.

The City has not yet allocated funding or formally scheduled its next wastewater system condition assessment but plans to initiate the assessment in Fiscal Year 2026-27.

PAGE 415 of 623
Element 8: System Evaluation, Capacity Assurance, and Capital Improvements City of San Marino Sewer System Management Plan Page 41 With the anticipated sewer fund starting in FY26 as proposed by the 2024 Sewer Rate Study, the City will be able to address known issues such as structural damage, corrosion, root intrusion, and manhole degradation.

8.2 Capacity Assessment and Design Criteria
In the 2019 Sewer Condition Assessment Report, it was determined that a hydraulic model was not necessary for capacity assessment, as the City’s system is already fully built-out. However, it was recommended that the City perform flow monitoring in order to reduce I&I issues and to assess capacity. The City plans to schedule and budget this in the future.

The City has not experienced any sanitary sewer spills due to hydraulic deficiencies and/or limited capacity in the sewer system in the past ten years. Should capacity-related spills begin to occur, the City will reevaluate the need for a formal capacity evaluation and hydraulic model development.

8.3 Prioritization of Corrective Action
Previously, the City identified recurring issues identified during CCTV inspections but lacked a formal process for scheduling and tracking future repairs. The City now plans to implement a more consistent and formalized process.

8.4 Capital Improvement Plan
The 2018-2019 wastewater condition assessment found that 13 of the 20 miles evaluated required lining. It is anticipated that additional lining needs will be identified once the remaining 30 miles of the system area is assessed. Although the recommended Capital Improvement Plan (CIP) lining projects have not yet been implemented, the City plans to schedule and budget for them in the future.

The 2018-2019 wastewater condition assessment also recommended implementing a manhole inspection program, which the City began to implement in 2024. This task is now part of the scope of work for the City’s sewer maintenance contractor, Premier Pipe. As part of their routine cleaning and CCTV inspections, Premier Pipe inspects manholes and documents their findings. These reports include defect ratings and are provided to the City for review.

For capital improvements, the City has currently been performing rehabilitation and replacement projects as condition-related issues arise. Pipelines needing immediate attention would be scheduled for rehabilitation or replacement immediately by the City’s contractor. All other rehabilitation or replacements will be generated into a project after City’s review.

The City completed a handful of projects in the past few years including: Del Mar Ave Pipeline Repair project (2024), California Blvd & Allen Ave Sewer Rehab Project (2023), Lorain Rd Sewer Repair project (2023), Virginia Rd Sewer Rehab project (2022), along with 7 manhole rehabilitations (2023). Only two of these projects are part of the 2018- 2019 CIP list. The City plans on completing the rest of the CIP projects by 2035.

On January 10, 2024, the City awarded a contract to CWS Systems, Inc. for the rehabilitation and upgrade of all three lift stations. Due to long lead times for several components, construction is currently underway and is expected to be completed by February 4, 2026.

The City only uses the General Fund for sewer construction and maintenance, including CIP projects. In 2025, the City conducted a Sewer Rate Study to propose a new sewer facility charge to be used for sewer construction and maintenance. The newly implemented sewer unit charges are expected to generate revenue to fund sewer PAGE 416 of 623
Element 8: System Evaluation, Capacity Assurance, and Capital Improvements City of San Marino Sewer System Management Plan Page 42 operating expenses and cover approximately half (49%) of the Capital Improvement Program (CIP). The City is anticipating for this new fund to take effect in FY 25-26.

Once potential projects are identified in the next condition assessment report, which is anticipated for FY 26/27, the City intends to prioritize them based on the urgency of repair or replacement needs. In addition to this new list, any incomplete projects from the previous CIP list will also be incorporated into the new list and prioritized. This priority list will be utilized to determine a schedule for completing these projects. Funding sources will also be identified in the report.

PAGE 417 of 623
Element 8: System Evaluation, Capacity Assurance, and Capital Improvements City of San Marino Sewer System Management Plan Page 43

INTENTIONALLY LEFT BLANK
PAGE 418 of 623
City of San Marino Sewer System Management Plan Page 44 9 Monitoring, Measurement and
Program Modifications
This section of the SSMP discusses parameters the City tracks to monitor the success of the SSMP and how the City plans to keep the SSMP current.

Requirements:

D.9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS: The Plan must include an Adaptive Management section that addresses Plan-implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element; • Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

In the past, the City did not have a formal process for tracking the success of SSMP elements. As issues arose and elements changed, the City tracked certain segments of each element of the SSMP such as organizational changes and system maintenance. Currently, the City is motivated to be proactive properly maintaining the sewer system and understand how tracking their SSMP elements will improve efficacy of this goal.

The City will perform regular tracking of the SSMP elements and their effectiveness. The City will develop a database, or similar tool, to maintain specific information related to the SSMP, as a central repository for changes to the SSMP and regularly track the success of SSMP elements. As for preventative maintenance activities (shown in Table 9-3, these are to be tracked and provided by the City’s contractor, Premier Pipe, Inc. The City will evaluate whether SSMP elements have changed so that changes can be documented in a Change Log to include the specific change, the date of the change and the name of the person making the change. The Change Log is included in Appendix I. Procedures and activities will be updated based on the tracking and assessment methods described therein. Table 9-1 details a schedule for evaluating the Monitoring, Measurement, and Program Modifications.

Table 9-1: SSMP Elements Tracking Schedule
Milestones Frequency Due DATES
Evaluate whether SSMP elements
have changed
twice a year 1/1 and 7/1 every year
Track the Success of SSMP Elements twice a year 1/1 and 7/1 every year Assess the Preventative Operation
and Maintenance Activities
twice a year 1/1 and 7/1 every year
PAGE 419 of 623
Element 9: Monitoring, Measurement and Program Modifications City of San Marino Sewer System Management Plan Page 45 The City has a renewed commitment to improved tracking and updating their procedures and activities as needed.

SSMP Audit findings will also be tracked and used to determine any necessary SSMP modifications. Table 9-2 describes the monitoring parameters for tracking the effectiveness of each Plan Element, which the City will also review during the SSMP Audit, in addition to the schedule depicted in Table 9-1.

Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
SSMP Goal and
Introduction
Provide a plan and schedule to: (1)
properly manage, operate, and
maintain all parts of the City’s
sanitary sewer system(s), (2) reduce
and prevent spills, and (3) contain
and mitigate spills that do occur
• City is following SSMP Update Schedule
• Annually review section
Organization Document LRO(s), organization of
City staff, contact information, and
chain of communication for spill
response
• Annually review section
Legal Authority Ensure the City has sufficient legal
authority required to implement the
SSMP plans and procedures
• Annually review section
Operations and
Maintenance Program
Minimize blockages and spills;
properly manage, operate, and
maintain all parts of the sanitary
sewer system; ensure system
operators (including employees,
contractors, or other agents) are
adequately trained
• Percentage of gravity sewer lines cleaned
• Percentage of sewer lines inspected by
televising
• Number of lift station failures
• Number of pipe failures
• Regular training related to SSMP
requirements
• Equipment inventory tracked
• Annually review section
Design and Performance
Provisions
Maintain updated design and
construction standards &
specifications for new sewer
systems, pump stations, and other
appurtenances, and for the
rehabilitation and repair of existing
sewer systems.
• Annually review section
Spill Emergency
Response Plan
Provide timely and effective
response, detection, mitigation,
clean up, investigation, and
documentation to spill emergencies;
and comply with regulatory reporting
requirements
• Average and maximum response time
• Percent of total overflow volume contained
or returned to sewer
• Compliance with notification, monitoring,
and reporting requirements
• Staff and contractors are implementing the
Spill Emergency Response Plan
• Perform regular training on the Spill
Emergency Response Plan.
• Contain any spills and prevent/minimize
discharge to waters of the State or any
drainage conveyance system
• Minimize and remediate public health
impacts and adverse impacts on beneficial
uses of waters of the State
PAGE 420 of 623
Element 9: Monitoring, Measurement and Program Modifications City of San Marino Sewer System Management Plan Page 46 Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
• Clean the spill area and drainage
conveyance system in a manner that does
not inadvertently impact beneficial uses in
the receiving waters
• Spill events are documented and reported
as required in the General Order
• Spill responses and assessed
• Conduct annual review of Spill Emergency
Response Plan
• Annually review section and update as
needed
Sewer Pipe Blockage
Control Plan
Incorporating sewer pipe blockage
control measures, including
identification of problem areas,
focused cleaning, and source control.
• Number of blockages due to FOG, rags,
debris, etc.
• Number of overflows due to FOG, rags,
debris, etc.
• Number of FOG producing facilities
inspected
• Number of enforcement measures at FOG
producing facilities
• An identification of sanitary sewer system
sections subject to fats, oils, and grease
blockages and establishment of a
cleaning schedule
• Implementation of source control
measures
• Plan and schedule for a public education
and outreach program
• Annually review section
System Evaluation,
Capacity Assurance, and
Capital Improvements
Evaluate procedures and activities
for: (1) routine evaluation and
assessment of system conditions; (2)
capacity assessment and design
criteria; (3) prioritization of corrective
actions; and (4) a capital
improvement plan.
• Number of spills due to capacity
limitations or wet weather
• Date of completion of most recent sewer
master plan, including flow metering
and/or hydraulic modeling
• 3-year backlog for capacity improvement
projects
• Utilize CCTV inspection and assessment
and tracking system deficiencies
• Prioritize projects based on their need for
repair and replacement
• Evaluate system deficiencies with recurrent
issues and how these can be turned into
rehabilitation or replacement projects.
• Creation of a schedule to complete these
projects
• Document system evaluation and condition
assessment inspections and activities
• Determine solutions to address infiltration
& inflow (I/I), aging infrastructure, corrosion
due to sulfuric acid, and sags in the system
due to unstable soil
PAGE 421 of 623
Element 9: Monitoring, Measurement and Program Modifications City of San Marino Sewer System Management Plan Page 47 Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
• Determine solutions to protect from heavy
rains, earthquakes, and other impacts of
climate change
• Determine funding sources
• Annually review section
Monitoring,
Measurement and
Program Modifications
Evaluate effectiveness of SSMP,
keep SSMP up-to-date, and identify
necessary changes
• Document SSMP information
• Follow schedule for reviewing SSMP
information
• Determine effectiveness of each Plan
Element
• Assess the success of preventive
operation and maintenance activities;
• Update Plan procedures and activities
based on evaluation
• Identify and illustrate spill trends
• Annually review section
Internal Audits Formally identify SSMP effectiveness,
limitations, and necessary changes
• Date of completion of last annual audit
• Audits occur during original audit cycle
• Audit is uploaded to CIWQS within 6
months of due date
• Deficiencies found during the audit are
addressed and corrected
• Annually review section
Communication Program Communicate with the public and
satellite agencies.
• SSMP is uploaded/updated on City’s
website & CIWQS
• Plan and schedule for a public education
and outreach program
• Notification program to the public for
sewer system management and
information on spills and discharges
• Annually review section
The City will use the specific monitoring parameters listed in Table 9-2 and documented on the tracking sheet included in Appendix J to assist in completion of the annual SSMP Audit described in Plan Element 10, Internal Audits. The City will also continue to collect data for all performance measures currently tracked. This additional information that the City collects, such as customer complaints and length of pipe cleaned, will be used to support or further evaluate the success and limitations of the SSMP as needed.

The City’s contractor tracked scheduled preventative maintenance, repairs, and cleaning activities and is committed to improve on the consistency of this tracking, including beginning to track system deficiencies with recurrent issues to further support the success of the SSMP. The City’s contractor has consistently tracked the components listed in Table 9-3 to quantitatively determine the effectiveness of preventive operation and maintenance activities. Using this data and comparing it to spill data shown in Table 9-4, the current preventative operation and maintenance activities appear to be successful in reducing spills.

PAGE 422 of 623
Element 9: Monitoring, Measurement and Program Modifications City of San Marino Sewer System Management Plan Page 48 Table 9-3 Preventive Operation and Maintenance Activities to Track Description of work event
Total length of gravity sewer lines cleaned
Percentage of gravity sewer lines cleaned
Total number of manhole inspections
Total length of sewer lines inspected by televising
Percentage of sewer lines inspected by televising
Table 9-4 shows the spill trends for the City. If spills do occur in the future, the City will include data related to spill frequency, locations, and estimated volumes.

Table 9-4: Spill Trends from 2015 to 2024
Year
No. of Spills
Category 1 Category 2 Category 3 Category 41 Total Spills 2015 0 0 0 N/A 0
2016 0 0 0 N/A 0
2017 0 0 0 N/A 0
2018 0 0 0 N/A 0
2019 0 0 0 N/A 0
2020 0 0 0 N/A 0
2021 0 0 0 N/A 0
2022 0 0 0 N/A 0
2023 0 0 0 0 0
2024 0 0 0 0 0
Note:
1 Category 4 spills will be reported in 2023 and beyond.

PAGE 423 of 623
Element 9: Monitoring, Measurement and Program Modifications City of San Marino Sewer System Management Plan Page 49

INTENTIONALLY LEFT BLANK
PAGE 424 of 623
City of San Marino Sewer System Management Plan Page 50 10 Internal Audits
This chapter discusses the City’s SSMP auditing program.

Requirements:

D.10. INTERNAL AUDITS: The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of the General Order.

The reissued State Water Resources Control Board’s Order Number WQ 2022-0103-DWQ requires that an agency conduct an internal audit of its SSMP at least once every three (3) years. The audit is to evaluate how the City has developed and implemented each of the eleven elements of the SSMP and how each element is functioning to assist in the prevention of sanitary sewer spills. The audit report shall be kept on file at the City offices and uploaded to the online California Integrated Water Quality System (CIWQS) database within 6 months after the end of the 3- year audit period. Any deficiencies found during the audit are addressed and corrected.

The due dates for the City’s SSMP and SSMP audits can be found here using the City’s WDID (4SSO10428):
https://www.waterboards.ca.gov/water_issues/programs/sso/lookup/ In 2025, the City contracted with Dudek to complete its audit and work closely with the City’s staff to review the SSMP, its implementation, and the effectiveness of the City’s efforts in reducing spills.

The City plans to complete audit requirements and due dates corresponding to the original audit cycle deadlines.

The City’s next SSMP audit is to be completed and uploaded to CIWQS by February 2, 2028. During this next audit, the City will:
• Evaluate the effectiveness of each SSMP element and identify areas of improvement. • Assess progress in implementing the SSMP and preventing sanitary sewer spills. • Review monitoring, measurement, and program modifications under Element 9. • Summarize system improvements completed in the previous year. • Outline planned system improvements for the upcoming year, including a proposed schedule.

Audit findings and recommendations will be incorporated into future SSMP Updates to ensure continuous improvement and regulatory compliance.

PAGE 425 of 623
Element 10: Internal Audits
City of San Marino Sewer System Management Plan Page 51

INTENTIONALLY LEFT BLANK
PAGE 426 of 623
11 Communication Program
This section of the SSMP discusses the City’s communications with the public.

Requirements:

D.11. COMMUNICATION PROGRAM: The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

The Plan must include procedures for the Enrollee to communicate with:
• The public for:
d. Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and e. The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
f. System operation, maintenance, and capital improvement-related activities.

The City maintains a public website (https://www.cityofSan Marino.net) to share updates, alerts, and news with residents. The homepage provides important announcements, City Council meeting agendas and minutes, and other key information for City residents.

Once approved, the City’s SSMP will be available on the City’s Streets, Sidewalks, & Sewer Maintenance section of the website
(https://www.sanmarinoca.gov/government/departments/parks___public_works_/streets,_sidewalks___sewer_maint enance.php). The SSMP link will include contact information for the Parks & Public Works Department to provide opportunities for public input on plan implementation and future updates. Hard copies of the SSMP are also available at the City office.

The San Marino City Council incorporates opportunities for public input regarding any sewer system concerns at its Board meetings. The Sewer Rate Study has been presented in public meetings, with opportunities for community feedback on its findings and financial implications related to sewer use fees.

The City has not experienced any sewer spills in the past ten years and, therefore, has not needed to notify the public about any incidents. In the event of a spill or discharge, the City will provide timely public notifications based on the location and severity of the incident. Communication methods may include website updates, social media posts, and notices posted in the vicinity of the discharge.

PAGE 427 of 623
Element 10: Internal Audits
City of San Marino Sewer System Management Plan Page 53

INTENTIONALLY LEFT BLANK
PAGE 428 of 623
Appendix A
The Reissued WDR: Order Number WQ 2022-0103-DWQ
PAGE 429 of 623

INTENTIONALLY LEFT BLANK
PAGE 430 of 623
1 STATE WATER RESOURCES CONTROL BOARD
1001 I Street, Sacramento, California 95814
ORDER WQ 2022-0103-DWQ

STATEWIDE WASTE DISCHARGE REQUIREMENTS

GENERAL ORDER FOR SANITARY SEWER SYSTEMS
This Order was adopted by the State Water Resources Control Board on December 6, 2022.

This Order shall become effective 180 days after the Adoption Date of this General Order, on June 5, 2023.

The Enrollee shall comply with the requirements of this Order upon the Effective Date of this General Order.

This General Order does not convey any property rights of any sort or any exclusive privileges.

The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, protect the Enrollee from liability under federal, state, or local laws, nor create a vested right for the Enrollee to continue the discharge of waste.

CERTIFICATION
I, Jeanine Townsend, Clerk to the Board, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the State Water Board on December 6, 2022.

AYE: Chair E. Joaquin Esquivel
Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: None
ABSTAIN: None
for
Jeanine Townsend
Clerk to the Board
PAGE 431 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
2 Table of Contents

1. Introduction .................................................................................................................... 4

2. Regulatory Coverage and Application Requirements .................................................... 5

2.1. Requirements for Continuation of Existing Regulatory Coverage ....................... 5

2.2. Requirements for New Regulatory Coverage...................................................... 5

2.3. Regulatory Coverage Transfer............................................................................ 7

3. Findings ......................................................................................................................... 7

3.1. Legal Authorities ................................................................................................. 7

3.2. General ............................................................................................................. 11

3.3. Water Quality Control Plans, Policies and Resolutions ..................................... 14

3.4. California Environmental Quality Act................................................................. 16

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders ................................................................................................... 16

3.6. Notification to Interested Parties ....................................................................... 17

4. Prohibitions .................................................................................................................. 17

4.1 Discharge of Sewage from a Sanitary Sewer System....................................... 17

4.2. Discharge of Sewage to Waters of the State..................................................... 17

4.3. Discharge of Sewage Creating a Nuisance....................................................... 18

5. Specifications............................................................................................................... 18

5.1. Designation of a Legally Responsible Official ................................................... 18

5.2. Sewer System Management Plan Development and Implementation............... 18

5.3. Certification of Sewer System Management Plan and Plan Updates................ 19

5.4. Sewer System Management Plan Audits .......................................................... 19

5.5. Six-Year Sewer System Management Plan Update.......................................... 21

5.6. System Resilience............................................................................................. 22

5.7. Allocation of Resources .................................................................................... 22

5.8. Designation of Data Submitters......................................................................... 22

5.9. Reporting Certification....................................................................................... 22

5.10. System Capacity ............................................................................................... 23

5.11. System Performance Analysis .......................................................................... 23

5.12. Spill Emergency Response Plan and Remedial Actions ................................... 23

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements ............. 24

5.14. Electronic Sanitary Sewer System Service Area Boundary Map....................... 26

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems ................................................................................... 26

5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services ..................................................... 27

5.17. Unintended Failure to Report ............................................................................ 27 PAGE 432 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
3 5.18. Duty to Report to Water Boards ........................................................................ 27

5.19. Operation and Maintenance............................................................................... 27

6. Provisions .................................................................................................................... 27

6.1. Enforcement Provisions .................................................................................... 27

6.2. Other Regional Water Board Orders ................................................................. 30

6.3. Sewer System Management Plan Availability ................................................... 31

6.4. Entry and Inspection ......................................................................................... 31 Table of Attachments
Attachment A – Definitions .....................................................................................................A-1 Attachment B – Application for Enrollment .............................................................................B-1 Attachment C - Notice of Termination.....................................................................................C-1 Attachment D – Sewer System Management Plan – Required Elements ..............................D-1 Attachment E1 – Notification, Monitoring, Reporting and Recordkeeping Requirements .....E1-1 Attachment E2 – Summary of Notification, Monitoring and Reporting Requirements...........E2-1 Attachment F – Regional Water Quality Control Board Contact Information ..........................F-1 PAGE 433 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
4 1. INTRODUCTION
This General Order regulates sanitary sewer systems designed to convey sewage. For the purpose of this Order, a sanitary sewer system includes, but is not limited to, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks. A sanitary sewer system includes:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

Sewage is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Sewage contains high levels of suspended solids, non-digested organic waste, pathogenic bacteria, viruses, toxic pollutants, nutrients, oxygen-demanding organic compounds, oils, grease, pharmaceuticals, and other harmful pollutants.

For the purpose of this General Order, a spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Sewage and its associated wastewater spilled from a sanitary sewer system may threaten public health, beneficial uses of waters of the State, and the environment.

This General Order serves as statewide waste discharge requirements and supersedes the previous State Water Resources Control Board (State Water Board) Order 2006-0003-DWQ and amendments thereafter. All sections and attachments of this General Order are enforceable by the State Water Board and Regional Water Quality Control Boards (Regional Water Boards). Through this General Order, the State Water Board requires an Enrollee to:
• Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;
• Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in this General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills; • Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;
• Monitor, track, and analyze spills for ongoing system-specific performance improvements; and
• Report noncompliance with this General Order per reporting requirements.

PAGE 434 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
5 An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one (1) mile or less in length where the State Water Board or a Regional Water Board requires regulatory coverage under this Order; or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Board or a Regional Water Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

For the purpose of this Order, a sanitary sewer system includes only systems owned and/or operated by the Enrollee.

2. REGULATORY COVERAGE AND APPLICATION REQUIREMENTS

2.1. Requirements for Continuation of Existing Regulatory Coverage To continue regulatory coverage from previous Order 2006-0003-DWQ under this General Order, within the 60-days-prior-to the Effective Date of this General Order, the Legally Responsible Official of an existing Enrollee shall electronically certify the Continuation of Existing Regulatory Coverage form in the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. The Legally Responsible Official will receive an automated CIWQS-issued Notice of Applicability email, confirming continuation of regulatory coverage under this General Order. All regulatory coverage under previous Order 2006-0003-DWQ will cease on the Effective Date of this Order.

An Enrollee continuing existing regulatory coverage is not required to submit a new application package or pay an application fee for enrollment under this General Order.

The annual fee due date for continued regulatory coverage from previous Order 2006-0003-DWQ to this General Order remains unchanged.

A previous Enrollee of Order 2006-0003-DWQ that fails to certify the Continuation of Existing Regulatory Coverage form in the online CIWQS database by the Effective Date of this Order is considered a New Applicant, and will not have regulatory coverage for its sanitary sewer system(s) until:
• A new application package for system(s) enrollment is submitted per section 2.2 (Requirements for New Regulatory Coverage) below; and
• The new application package is approved per section 2.2.2 (Approval of Application Package (For New Applicants Only)).

2.2. Requirements for New Regulatory Coverage
No later than 60 days prior to commencing and/or assuming operation and maintenance responsibilities of a sanitary sewer system, a duly authorized representative that PAGE 435 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
6 maintains legal authority over the public or private sanitary sewer system is required to enroll under this General Order by submitting a complete application package as specified below and as provided in Attachment B (Application for Enrollment Form) of this General Order.

Unless required by a Regional Water Board, a public agency that owns a combined sewer system subject to the Combined Sewer Overflow Control Policy (33 U.S. Code § 1342(q)), is not required to enroll, under this Order, the portions of its sanitary sewer system(s) that collects combined sanitary wastewater and stormwater.

2.2.1. Application Package Requirements
The Application for Enrollment package for new applicants must include the following items:
• Application for Enrollment Form. The form in Attachment B of this General Order must be completed, signed, and certified by a Legally Responsible Official, in accordance with section 5.1 (Designation of a Legally Responsible Official) of this General Order. If an electronic Application for Enrollment form is available at the time of application, a new applicant shall submit its application form electronically; and
• Application Fee. A fee payable to the “State Water Resources Control Board” in accordance with the Fee Schedule in the California Code of Regulations, Title 23, section 2200, or subsequent fee regulations updates.

The application fee for this General Order is based on the sanitary sewer system’s threat to water quality and complexity designations of category 2C or 3C, which is assigned based on the population served by the system. The current Fee Schedule for sanitary sewer systems is listed under subdivision (a)(2) at the following website:

Fee Schedule (https://www.waterboards.ca.gov/resources/fees/water_quality/).

2.2.2. Approval of Application Package (For New Applicants Only) The Deputy Director of the State Water Board, Division of Water Quality (Deputy Director) will consider approval of each complete Application for Enrollment package.

The Deputy Director will issue a Notice of Applicability letter which serves as approved regulatory coverage for the new Enrollee.

If the submitted application package is not complete in accordance with section 2.2.1 (Application Package Requirements) of this General Order, the Deputy Director will send a response letter to the applicant outlining the application deficiencies. The applicant will have 60 days from the date of the response letter to correct the application deficiencies and submit the identified items necessary to complete the application package to the State Water Board.

2.2.3. Electronic Reporting Account for New Enrollee
Within 30 days after the date of the Approval of Complete Application Package for System Enrollment, a duly authorized representative for the Enrollee shall obtain a CIWQS Sanitary Sewer System Database user account by clicking the “User Registration” button and following the directions on the CIWQS Login Page PAGE 436 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
7 (https://ciwqs.waterboards.ca.gov). If additional assistance is needed to establish an online CIWQS user account, contact State Water Board staff by email at [email protected]. The online user account will provide the Enrollee secure access to the online CIWQS database for electronic reporting.

2.3. Regulatory Coverage Transfer
Regulatory coverage under this General Order is not transferable to any person or party except after an existing Enrollee submits a written request for a regulatory coverage transfer to the Deputy Director, at least 60 days in advance of any proposed system ownership transfer. The written request must include a written agreement between the existing Enrollee and the new Enrollee containing:
• Acknowledgement that the transfer of ownership is solely of an existing system with an existing waste discharge identification (WDID) number; • The specific ownership transfer date in which the responsibility and regulatory coverage transfer between the existing Enrollee and the new Enrollee becomes effective; and
• Acknowledgement that the existing Enrollee is liable for violations occurring up to the ownership transfer date and that the new Enrollee is liable for violations occurring on and after the ownership transfer date.

The Deputy Director will consider approval of the written request. If approved, the Deputy Director will issue a Notice of Applicability letter which serves as an approved transfer of regulatory coverage to the new Enrollee.

3. FINDINGS

3.1. Legal Authorities

3.1.1. Federal and State Regulatory Authority
The objective of the Clean Water Act is to restore and maintain the chemical, physical, and biological integrity of the waters of the United States (33 U.S.C. 1251). The Water Code authorizes the State Water Board to implement the Clean Water Act in the State and to protect the quality of all waters of the State (Water Code sections 13000 and 13160).

3.1.2. Discharge of Sewage
A discharge of untreated or partially treated sewage is a discharge of waste as defined in Water Code section 13050(d) that could affect the quality of waters of the State and is subject to regulation by waste discharge requirements issued pursuant to Water Code section 13263 and Chapter 9, Division 3, Title 23 of the California Code of Regulations.

A discharge of sewage may pollute and alter the quality of the waters of the State to a degree that unreasonably affects the beneficial uses of the receiving water body or facilities that serve those beneficial uses (Water Code section 13050(l)(1)).

PAGE 437 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
8 3.1.3 Water Boards Authority to Require Technical Reports, Monitoring, and Reporting Water Code sections 13267 and 13383 authorize the Regional Water Boards and the State Water Board to establish monitoring, inspection, entry, reporting, and recordkeeping requirements. Water Code section 13267(b), authorizes the Regional Water Boards to “require any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region… or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of water within its region shall furnish, under penalty of perjury, technical or monitoring reports which the regional board requires…In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports and shall identify the evidence that supports requiring that person to provide the reports.” Water Code section 13267(f) authorizes the State Water Board to require this information if it consults with the Regional Water Boards and determines that it will not duplicate the efforts of the Regional Water Boards. The State Water Board has consulted with the Regional Water Boards and made this determination.

The technical and monitoring reports required by this General Order and Attachment E (Notification, Monitoring, Reporting and Recordkeeping Requirements) are necessary to evaluate and ensure compliance with this General Order. The effort to develop required technical reports will vary depending on the system size and complexity and the needs of the specific technical report. The burden and cost of these reports are reasonable and consistent with the interest of the state in protecting water quality, which is the primary purpose of requiring the reports.

Water Code section 13383(a) authorizes the Water Boards to “establish monitoring, inspection, entry, reporting, and recordkeeping requirements… for any person who discharges, or proposes to discharge, to navigable waters, any person who introduces pollutants into a publicly owned treatment works, any person who owns or operates, or proposes to own or operate, a publicly owned treatment works or other treatment works treating domestic sewage, or any person who uses or disposes, or proposes to use or dispose, of sewage sludge.” Section 13383(b) continues, “the state board or the regional boards may require any person subject to this section to establish and maintain monitoring equipment or methods, including, where appropriate, biological monitoring methods, sample effluent as prescribed, and provide other information as may be reasonably required.”
Reporting of spills from privately owned sewer laterals and systems pursuant to section

5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) of this General Order is authorized by Water Code section 13225(c) and encouraged by the State Water Board, wherein a local agency may investigate and report on any technical factors involved in water quality control provided the burden including costs of such reports bears a reasonable relationship to the need for the report and the benefits to be obtained therefrom. The burden of reporting private spills under section 5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) is minimal and is outweighed by the benefit of providing Regional Water Boards an opportunity to respond to these spills PAGE 438 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
9 when an Enrollee, which in many cases has a contractual relationship with the owner of the private system, has knowledge of the spills.

3.1.4. Water Board Authority to Prescribe General Waste Discharge Requirements Water Code section 13263(i) provides that the State Water Board may prescribe general waste discharge requirements for a category of discharges if the State Water Board finds or determines that:
• The discharges are produced by the same or similar operations; • The discharges involve the same or similar types of waste; • The discharges require the same or similar treatment standards; and • The discharges are more appropriately regulated under general waste discharge requirements than individual waste discharge requirements.

Since 2006, the State Water Board has been regulating over 1,100 publicly owned sanitary sewer systems (See section 3.1.5 (Previous Statewide General Waste Discharge Requirements) of this General Order). California also has a large unknown number of unregulated privately owned sanitary sewer systems. All waste conveyed in publicly owned and privately owned sanitary sewer systems (as defined in this General Order) is comprised of untreated or partially treated domestic waste and/or industrial waste. Generally, sanitary sewer systems are designed and operated to convey waste by gravity or under pressure; system-specific design elements and system-specific operations do not change the common nature of the waste, the common threat to public health, or the common impacts on water quality. Spills of waste from a sanitary sewer system prior to reaching the ultimate downstream treatment facility are unauthorized and enforceable by the State Water Board and/or a Regional Water Board. Therefore, spills from sanitary sewer systems are more appropriately regulated under general waste discharge requirements.

As specified in Water Code sections 13263(a) and 13241, the implementation of requirements set forth in this Order is for the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each Regional Water Board and take into account the environmental characteristics of sewer service areas and hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect water quality, costs associated with compliance with these requirements, the need for developing housing within California, and the need to protect sources of drinking water and other water supplies.

3.1.5. Previous Statewide General Waste Discharge Requirements On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ serving as Waste Discharge Requirements pursuant to Article 4, Chapter 4, Division 7 of the Water Code (commencing with section 13260) for inadvertent discharges to waters of the State. Order 2006-0003-DWQ prohibited discharges of untreated or partially treated sewage. Order 2006-0003-DWQ also required system-specific management, operation, and maintenance of publicly owned sewer systems greater than one mile in length.

PAGE 439 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
10 To decrease the impacts on human health and the environment caused by sewage spills, the previous Order required enrollees to develop a rehabilitation and replacement plan that identifies system deficiencies and prioritizes short-term and long-term rehabilitation actions. The previous Order also required enrollees to:

1. Maintain information that can be used to establish and prioritize appropriate Sewer System Management Plan activities; and

2. Implement a proactive approach to reduce spills.

The previous Order required Sewer System Management Plan elements for “the proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management.”
On July 30, 2013, the State Water Board amended General Order 2006-0003-DWQ with Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

Many enrollees of Order 2006-0003-DWQ have already implemented proactive measures to reduce sewage spills. Other enrollees, however, still need technical assistance and funding to improve sanitary sewer system operation and maintenance for the reduction of sewage spills.

3.1.6. Existing Memorandum of Agreement with California Water Environment Association
The California Water Environment Association is a nonprofit organization dedicated to providing water industry certifications, training, and networking opportunities. The Association’s Technical Certification Program provides accredited sanitary sewer system operator certification for collection system operators and maintenance workers.

On February 10, 2016, the State Water Board entered into a collaborative agreement with the Association titled Memorandum of Agreement Between the California State Water Resources Control Board and the California Water Environment Association - Training Regarding Requirements Set Forth in Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The Memorandum sets forth collaborative training necessary for regulated sanitary sewer system personnel to operate and maintain a well operating system and ensure full compliance with statewide sewer system regulations.

On March 15, 2018, the State Water Board and the California Water Environment Association amended the existing Memorandum of Agreement to include collaborative outreach and expand training needs associated with further updates to Water Board regulations for sanitary sewer systems. The State Water Board encourages further Agreement updates as necessary to support improved sewer system operations and the professionalism of collection system operators.

PAGE 440 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
11 3.2. General

3.2.1. Waters of the State
Waters of the State include any surface water or groundwater, including saline waters, within the boundaries of the state as defined in Water Code section 13050(e), and are inclusive of waters of the United States.

3.2.2. Sanitary Sewer System Spill Threats to Public Health and Beneficial Uses Sewage contains high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. Sewage spills may cause a public nuisance, particularly when sewage is discharged to areas with high public exposure such as streets and surface waters used for drinking, irrigation, fishing, recreation, or other public consumption or contact uses.

More specifically, sanitary sewer spills may:
• Adversely affect aquatic life and/or threaten water quality when reaching receiving waters;
• Inadvertently release trash, including plastics;
• Impair the recreational use and aesthetic enjoyment of surface waters by polluting surface water or groundwater;
• Threaten public health through direct public exposure to bacteria, viruses, intestinal parasites, and other microorganisms that can cause serious illness such as gastroenteritis, hepatitis, cryptosporidiosis, and giardiasis; • Negatively impact ecological receptors and biota within surface waters; and • Cause nuisance including odors, closure of beaches and recreational areas, and property damage.

Sanitary sewer system spills may pollute receiving waters and threaten beneficial uses of surface water and groundwater. Potentially threatened beneficial uses include, but are not limited to the following (with associated acronym representations as included in statewide water quality control plans and Regional Water Boards’ Basin Plans):
• Municipal and Domestic Supply (MUN)
• Water Contact Recreation (REC-1) and Non-Contact Water Recreation (REC-2) • Cold Freshwater Habitat (COLD)
• Warm Freshwater Habitat (WARM)
• Native American Culture (CUL)
• Wildlife Habitat (WILD)
• Rare, Threatened, or Endangered Species (RARE)
• Spawning, Reproduction, and/or Early Development (SPWN) • Wetland Habitat (WET)
• Agricultural Supply (AGR)
• Estuarine Habitat (EST)
PAGE 441 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
12 • Commercial and Sport Fishing (COMM)
• Subsistence Fishing (SUB)
• Tribal Tradition and Culture (CUL)
• Tribal Subsistence Fishing (T-SUB)
• Aquaculture (AQUA)
• Marine Habitat (MAR)
• Preservation of Biological Habitats of Special Significance (BIOL) • Migration of Aquatic Organisms (MIGR)
• Shellfish Harvesting (SHELL)
• Industrial Process Supply (PROC)
• Industrial Service Supply (IND)
• Hydropower Generation (POW)
• Navigation (NAV)
• Flood Peak Attenuation/Flood Water Storage (FLD)
• Water Quality Enhancement (WQE)
• Fresh Water Replenishment (FRSH)
• Groundwater Recharge (GWR)
• Inland Saline Water Habitat (SAL)

3.2.3. Proactive Sanitary Sewer System Management to Eliminate Spill Causes Finding 3 of the previous Order, 2006-0003-DWQ, states: “Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO [sanitary sewer overflow].

A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs.”
Many spills are preventable through proactive attention on sanitary sewer system management using the best practices and technologies available to address major causes of spills, including but not limited to:
• Blockages from sources including but not limited to:
o Fats, oils and grease;
o Tree roots;
o Rags, wipes and other paper, cloth and plastic products; and o Sediment and debris.
• Sewer system damage and exceedance of sewer system hydraulic capacity from identified system-specific environmental, and climate-change impacts, including but not limited to:

PAGE 442 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
13 o Sea level rise impacts including flooding, coastal erosion, seawater intrusion, tidal inundation and submerged lands;
o Increased surface water flows due to higher intensity rain events; o Flooding;
o Wildfires and wildfire induced impacts;
o Earthquake induced damage;
o Landslides; and
o Subsidence.
• Infrastructure deficiencies and failures, including but not limited to:
o Pump station mechanical failures;
o System age;
o Construction material failures;
o Manhole cover failures;
o Structural failures; and
o Lack of proper operation and maintenance.
• Insufficient system capacity (temporary or sustained), due to factors including but not limited to:
o Excessive and/or increased storm or groundwater inflow/infiltration; o Insufficient capacity due to population increase and/or new connections from industrial, commercial and other system users; and
o Stormwater capture projects utilizing a sanitary sewer system to convey stormwater to treatment facilities for reuse.
• Community impacts, including but not limited to:
o Power outages;
o Vandalism; and
o Contractor-caused or other third party-caused damages.

3.2.4. Underground Sanitary Sewer System Leakage
Portions of some sanitary sewer systems may leak, causing underground exfiltration (exiting) of sewage from the system. Exfiltrated sewage that remains in the underground infrastructure trench and/or the soil matrix, and that does not discharge into waters of the State (surface water or groundwater) may not threaten beneficial uses.

Underground exfiltrated sewage may threaten beneficial uses if discharged to waters of the State. Exfiltrated sewage that discharges to groundwater may impact beneficial uses of groundwater and pollute groundwater supply. Additionally, if in close proximity, exfiltrated sewage may enter into a compromised underground drainage conveyance system that discharges into a water of the United States, or into groundwater that is hydrologically connected to (feeds into) a water of the United States, thus potentially causing: (1) a Clean Water Act violation, (2) threat and impact to beneficial uses, and/or (3) surface water pollution.

PAGE 443 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
14 3.2.5. Proactive Sanitary Sewer System Management to Reduce Inflow and Infiltration Excessive inflow (stormwater entering) and infiltration (groundwater seepage entering) to sanitary sewer systems is preventable through proactive sewer system management using the best practices and technologies available. The efficiency of the downstream wastewater treatment processes is dependent on the performance of the sanitary sewer system. When the structural integrity of a sanitary sewer system deteriorates, high volumes of inflow and infiltration can enter the sewer system. High levels of inflow and infiltration increase the hydraulic load on the downstream treatment plant, which can reduce treatment efficiency, lead to bypassing a portion of the treatment process, cause illegal discharge of partially treated effluent, or in extreme situations make biological treatment facilities inoperable (e.g., wash out the biological organisms that treat the waste).

3.3. Water Quality Control Plans, Policies and Resolutions The nine Regional Water Boards have adopted region-specific water quality control plans (commonly referred to as Basin Plans) that designate beneficial uses, establish water quality objectives, and contain implementation programs and policies to achieve those objectives. The State Water Board has adopted statewide water quality control plans, policies and resolutions establishing statewide water quality objectives, implementation programs and initiatives.

3.3.1. State Water Board Antidegradation Policy
On October 28, 1968, the State Water Board adopted Resolution 68-16, titled Statement of Policy with Respect to Maintaining High Quality of Waters in California, which incorporates the federal antidegradation policy. Resolution 68-16 requires that existing water quality be maintained unless degradation is justified based on specific findings.

The continued prohibition of sewage discharges from sanitary sewer systems into waters of the State aligns with Resolution 68-16. A sewage discharge from sanitary sewers to waters of the State is prohibited by this Order. Therefore, this Order does not allow degradation of waters of the State. In addition, this Order: (1) further expands the existing prohibition of sewage discharges to include waters of the State, in addition to waters of the United States as provided in previous Order 2006-0003-DWQ, and (2) enhances the ability for Water Board enforcement of violations of the established prohibitions.

3.3.2. State Water Board Sources of Drinking Water Policy On May 19,1988, the State Water Board adopted Resolution 88-63 (amended on February 1, 2006), titled Sources of Drinking Water, establishing state policy that all waters of the State, with certain exceptions, are suitable or potentially suitable for municipal or domestic supply.

3.3.3. State Water Board Cost of Compliance Resolution
On September 24, 2013, the State Water Board adopted Resolution 2013-0029, titled Directing Actions in Response to Efforts by Stakeholders on Reducing Costs of PAGE 444 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
15 Compliance While Maintaining Water Quality Protection. Through this resolution, the State Water Board committed to continued stakeholder engagement in identifying and implementing measures to reduce costs of compliance with regulatory orders while maintaining water quality protection and improving regulatory program outcomes.

3.3.4. State Water Board Human Right to Water Resolution On February 16, 2016, the State Water Board adopted Resolution 2016-0010, titled Adopting the Human Right to Water as a Core Value and Directing its Implementation in Water Board Programs and Activities, addressing the human right to water as a core value and directing Water Board programs to implement requirements to support safe drinking water for all Californians.

On November 16, 2021, the State Water Board adopted Resolution 2021-0050 titled Condemning Racism, Xenophobia, Bigotry, and Racial Injustice, and Strengthening Commitment to Racial Equity, Diversity, Inclusion, Access, and Anti-racism. Among other actions, through Resolution 2021-0050, the State Water Board, in summary as corresponding to this General Order, reaffirms its commitment to its Human Right to Water resolution, upholding that every human being in California deserves safe, clean, affordable, and accessible water for human consumption, cooking, and sanitation purposes. Resolution 2021-0050 provides the State Water Board commitment to:
• Protect public health and beneficial uses of waterbodies in all communities, including communities disproportionately burdened by wastes discharge of waste to land and surface water;
• Restore impaired surface waterbodies and degraded aquifers; and • Promote multi-benefit water quality projects.

Through Resolution 2021-0050, the State Water Board also commits to expanding implementation of its Climate Change Resolution to address the disproportionate effects of extreme hydrologic conditions and sea-level rise on Black, Indigenous, and people of color communities, prioritizing:
• The right to safe, clean, affordable, and accessible drinking water and sanitation; • Sustainable management and protection of local groundwater resources; • Healthy watersheds; and
• Access to surface waterbodies that support subsistence fishing.

On June 7, 2022, the State Water Board adopted a Resolution, titled Authorizing the Executive Director or Designee to Enter into One or More Multi-Year Contracts Up to a Combined Sum of $4,000,000 for a Statewide Wastewater Needs Assessment, supporting the equitable access to sanitation for all Californians and implementation of Resolutions 2016-0010 and 2021-0050.

This General Order supports the State Water Board priority in collecting a comprehensive set of data for California’s wastewater systems, including sanitary sewer systems. Data reported per the requirements of this Order will be used with data from other Water Boards’ programs, to further develop criteria and create a statewide risk PAGE 445 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
16 framework to prioritize critical funding and infrastructure investments for California’s most vulnerable populations, including disadvantaged or severely disadvantaged communities with inadequate or failing sanitation systems and threatened access to healthy drinking water supplies.

3.3.5. State Water Board Open Data Resolution
On July 10, 2018, the State Water Board adopted Resolution 2018-0032, titled Adopting Principles of Open Data as a Core Value and Directing Programs and Activities to Implement Strategic Actions to Improve Data Accessibility and Associated Innovation, directing regulatory programs to assure all monitoring and reporting requirements support the State Water Boards’ Open Data Initiative.

3.3.6. State Water Board Response to Climate Change
On March 7, 2017, the State Water Board adopted Resolution 2017-0012, titled Comprehensive Response to Climate Change, requiring a proactive response to climate change in all California Water Board actions, with the intent to embed climate change consideration into all programs and activities.

3.4. California Environmental Quality Act
The adoption of this Order is an action to reissue general waste discharge requirements that is exempt from the California Environmental Quality Act (Public Resources Code section 21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment (Cal. Code Regs., Title 14, section 15308). In addition, the action to adopt this Order is exempt from CEQA pursuant to Cal. Code Regs., Title 14, section 15301, to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in sections 15301 and 15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity.

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders
The State Water Board, Division of Financial Assistance administers the implementation of the State Water Board financial assistance programs, per Board-adopted funding policies. Among other funding areas, the Division administers loan and grant funding for the planning and construction of wastewater and water recycling facilities per funding program-specific policies and guidelines. Applicants may apply for Clean Water State Revolving Fund low-interest loan, Small Community Wastewater grant funding assistance, and other funding available at the time of application, for some of the costs associated with complying with this General Order.

Funding applicants may obtain further information regarding current funding opportunities, and Division of Financial Assistance staff contact information at the following website: Financial Assistance Funding - Grants and Loans | California State Water Resources Control Board.
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/) PAGE 446 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
17 Section 13477.6 of the Water Code authorizes the Small Community Grant Fund.

The Small Community Grant Fund allows the State Water Board to provide grant funding assistance to small, disadvantaged communities and small severely disadvantaged communities that may not otherwise be able to afford a loan or similar financing for projects to comply with requirements of this General Order. The State Water Board also considers loan forgiveness on a disadvantaged community-specific basis.

For disadvantaged communities’ wastewater needs, the State Water Board places priority on the funding of projects that address:
• Public health;
• Violations of waste discharge requirements and National Pollutant Discharge Elimination System (NPDES) permits;
• Providing sewer system service to existing septic tank owners; and • High priority public health and water quality concerns identified by a Regional Water Board.

3.6. Notification to Interested Parties
On January 31, 2022, the State Water Board notified interested parties and persons of its intent to reissue Sanitary Sewer Systems General Order 2006-0003-DWQ by issuing a draft General Order for a 60-day public comment period. State Water Board staff conducted extensive stakeholder outreach and encouraged public participation in the adoption process for this General Order. On March 15, 2022, the State Water Board held a public meeting to hear and consider oral public comments. The State Water Board considered all public comments prior to adopting this General Order.

THEREFORE, IT IS HEREBY ORDERED, that pursuant to Water Code sections 13263, 13267, and 13383 this General Order supersedes Order 2006-0003-DWQ, Order WQ 2013-0058-EXEC, and any amendments made to these Orders thereafter, except for enforcement purposes and to meet the provisions contained in Division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations and guidelines adopted thereunder, the Enrollee shall comply with the requirements in this Order.

4. PROHIBITIONS

4.1 Discharge of Sewage from a Sanitary Sewer System
Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required in this General Order.

4.2. Discharge of Sewage to Waters of the State
Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited.

PAGE 447 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
18 4.3. Discharge of Sewage Creating a Nuisance
Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.

5. SPECIFICATIONS

5.1. Designation of a Legally Responsible Official
The Enrollee shall designate a Legally Responsible Official that has authority to ensure the enrolled sanitary sewer system(s) complies with this Order, and is authorized to serve as a duly authorized representative. The Legally Responsible Official must have responsibility over management of the Enrollee’s entire sanitary sewer system, and must be authorized to make managerial decisions that govern the operation of the sanitary sewer system, including having the explicit or implicit duty of making major capital improvement recommendations to ensure long-term environmental compliance.

The Legally Responsible Official must have or have direct authority over individuals that:
• Possess a recognized degree or certificate related to operations and maintenance of sanitary sewer systems, and/or
• Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.

For example, a sewer system superintendent or manager, an operations manager, a public utilities manager or director, or a district engineer may be designated as a Legally Responsible Official.

The Legally Responsible Official shall complete the electronic CIWQS “User Registration” form (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp). A Legally Responsible Official that represents multiple enrolled systems shall complete the electronic CIWQS “User Registration” form for each system.

The Enrollee shall submit any change to its Legally Responsible Official, and/or change in contact information, to the State Water Board within 30 calendar days of the change by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.2. Sewer System Management Plan Development and Implementation To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan.

The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the PAGE 448 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
19 prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.

For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation of Existing Regulatory Coverage, per section 2.1 (Requirements for Continuation of Existing Regulatory Coverage) of this General Order:

Within six (6) months of the Adoption Date of this General Order:
• The Legally Responsible Official shall upload the Enrollee’s existing Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

For a new Enrollee:

Within twelve (12) months of the Application for Enrollment approval date:
• The governing entity of the new Enrollee shall approve its Sewer System Management Plan; and
• The Legally Responsible Official shall certify and upload its Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

5.3. Certification of Sewer System Management Plan and Plan Updates The Legally Responsible Official shall certify and upload its Sewer System Management Plan and all subsequent updates to the online CIWQS Sanitary Sewer System Database.

5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.

Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.

The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
PAGE 449 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
20 • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.

A new Enrollee of this General Order (that did not have a sanitary sewer system enrolled in the previous State Water Board Order 2006-0003-DWQ) shall conduct its first internal Sewer System Management Plan audit for the time period between the date of submittal of its certified Sewer System Management Plan and the third subsequent December 31st date. The audit report must be submitted into the online CIWQS Sanitary Sewer System Database by July 1 of the following calendar year.

See the following tables for clarification:

Initial Audit Period and Audit Due Date for New Enrollees Audit Period Audit Due Date
New Enrollee
Certified Sewer System Management
Plan Submittal Date
through
the third subsequent December 31
st date
July 1
st date after
audit period
Example
Certified Sewer System Management
Plan Submittal Date of August 2, 2025
Audit Period of August 2, 2025 through
December 31, 2027
July 1, 2028
PAGE 450 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
21 Initial Audit Period for Transition from 2-Year Audit Required in Previous Order 2006-0003-DWQ to 3-Year Audit Required in this General Order Audit Period Audit Due Date
An Enrollee
previously
regulated by Order
2006-003-DWQ
A 3-year period starting from the end of
last required 2-year Audit Period
Within six months
after end of 3-year
Audit Period
Example
Last required Audit Period start date of
August 2, 2021;
Audit Period of August 2, 2021 through
August 1, 2024
February 1, 2025
Three-Year Ongoing Audit Period
Audit Period Audit Due Date
Each Enrollee A 3-year period starting from the end of
last required Audit Period
Within six months
after end of 3-year
Audit Period

5.5. Six-Year Sewer System Management Plan Update
At a minimum, the Enrollee shall update its Sewer System Management Plan every six (6) years after the date of its last Plan Update due date. (For an Enrollee previously regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this Order. The Updated Sewer System Management Plan must include:
• Elements required in Attachment D (Sewer System Management Plan – Required Elements) of this Order;
• Summary of revisions included in the Plan update based on internal audit findings; and
• Other sewer system management-related changes.

The Enrollee’s governing entity shall approve the updated Plan. The Legally Responsible Official shall upload and certify the approved updated Plan in the online CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During the time period in between Plan updates, the Enrollee shall continuously document changes to its Sewer System Management Plan in a change log attached to the Plan.

PAGE 451 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
22 5.6. System Resilience
The Enrollee shall include and implement system-specific procedures in its Sewer System Management Plan to proactively prioritize: (1) operation and maintenance, (2) condition assessments, and (3) repair and rehabilitation, to address ongoing system resilience, as specified in Attachment D (Sewer System Management Plan – Required Elements) of this General Order.

5.7. Allocation of Resources
The Enrollee shall:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementation of its updated Sewer System Management Plan, o System operation, maintenance, and repair, and
o Spill responses.

5.8. Designation of Data Submitters
The Legally Responsible Official may designate one or more individuals as a Data Submitter for reporting of spill data. The Legally Responsible Official shall authorize the designation of Data Submitter(s) through the online CIWQS database (https://ciwqs.waterboards.ca.gov) prior to the individuals establishing a CIWQS user account (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp) and entering spill data into the online CIWQS Sanitary Sewer System Database.

The Legally Responsible Official shall submit any change to its Data Submitter(s), and/or change in Data Submitter contact information, to the State Water Board within 30 calendar days of the change, by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.9. Reporting Certification
The Legally Responsible Official shall electronically certify, on the Enrollee’s behalf, all applications, reports, the Sewer System Management Plan(s) and corresponding updates, and other information submitted electronically into the online CIWQS Sanitary Sewer System Database, as follows:
“I certify under penalty of perjury under the laws of the State of California that the electronically submitted information was prepared under my direction or supervision.

Based on my inquiry of the person(s) directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete, and complies with the Statewide Sanitary Sewer Systems General Order.

I am aware that there are significant penalties for submitting false information.” PAGE 452 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
23 Hardcopy submittals to the State Water Board must be accompanied by the above certification statement.

5.10. System Capacity
The Enrollee shall maintain the system capacity necessary to convey: (1) base flows during dry weather conditions, and (2) wet weather peak flows consistent with designated local historic storms. Design storms must take into account system-specific stormwater contributions via inflow and infiltration, and location-specific depth of groundwater and storm frequencies. The Enrollee shall implement capital improvements to provide adequate hydraulic capacity to:
• Meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance element of its Sewer System Management Plan; and • Prevent system capacity-related spills, and adverse impacts to the treatment efficiency of downstream wastewater treatment facilities.

5.11. System Performance Analysis
The Enrollee shall include a running 10-year system performance analysis in its Annual Report. The analysis must include two CIWQS-generated graphs presenting the following information:

Graph 1 – Total Spill Volume per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total spill volume, per Spill Category, for each calendar year.

Graph 2 – Total Number of Spills per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total number of spills, per Spill Category, for each calendar year.

The current calendar year is the calendar year covered in the Annual Report.

The Enrollee shall generate the graphs in CIWQS, using the existing data in the online CIWQS Sanitary Sewer System Database at the following graph generation link:
(https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportActio n=criteria&reportId=sso_operation_report).

5.12. Spill Emergency Response Plan and Remedial Actions For Existing Enrollees (with regulatory coverage under Order 2006-0003-DWQ):

Within six (6) months of the Adoption Date of this General Order, the Enrollee shall update and implement its Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

PAGE 453 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
24 For New Enrollees:

Within six (6) months of the Application for Enrollment approval date, the Enrollee shall develop and implement a Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

The Enrollee shall certify, in its Annual Report, that its Spill Emergency Response Plan is up to date.

The Spill Emergency Response Plan shall include measures to protect public health and the environment. The Enrollee shall respond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State;
• Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State;
• Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and
• Cleaning publicly accessible areas while preventing toxic discharges to waters of the State.

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements The Enrollee shall comply with notification, monitoring, reporting, and recordkeeping requirements in Attachment E1 of this General Order.

5.13.1. Spill Categories
Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or
o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

PAGE 454 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
25 A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section

3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.
• Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

5.13.2. Annual Report
The Enrollee shall submit an Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

For new Enrollees: Within 30 days of obtaining a CIWQS account, a new Enrollee shall submit its initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

PAGE 455 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
26 5.14. Electronic Sanitary Sewer System Service Area Boundary Map For continuing enrollees, starting on July 1, 2025, and no later than December 31, 2025:

For new enrollees – no earlier than July 1, 2025, or within 12 months of the Application for Enrollment approval date, whichever date is later:

The Legally Responsible Official shall submit, to the State Water Board, geospatial data detailing the locations of the Enrollee’s sanitary sewer system service area boundary, per the required content and specifications in section 3.8 (Electronic Sanitary Sewer System Service Area Boundary Map) of Attachment E1 of this General Order, for each system identified by a WDID number.

An Enrollee of a disadvantaged community that may need assistance developing an electronic map to comply with this requirement, may contact State Water Board staff for assistance at [email protected].

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems
Within 24 hours of becoming aware of a spill (as described below) from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to report the following observations to the online CIWQS Sanitary Sewer System Database at the following link:
https://ciwqs.waterboards.ca.gov:
• A spill equal or greater than 1,000 gallons that discharges (or has a potential to discharge) to a water of the State, or a drainage conveyance system that discharges to waters of the State; or
• Any volume of sewage that discharges (or has a potential to discharge) to surface waters.

In the CIWQS module, the Enrollee is encouraged to identify:
• Time of observation;
• Description of general spill location (for example, street name and cross street names);
• Estimated volume of spill;
• If known, general description of spill destination (for example, flowing into drainage channel, flowing directly into a creek, etc.); and
• If known, name of private system owner/operator.

The CIWQS database will make the name and contact information of the entity voluntarily reporting a private spill, accessible to State and Regional Water Board staff only. The CIWQS database will only make information regarding the actual spill, accessible to the public.

PAGE 456 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
27 5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services
Upon observing or acquiring knowledge of any of the following from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to notify the California Office of Emergency Services (as provided by Health and Safety Code section 5410 et. seq. and Water Code section 13271), or inform the responsible party that State law requires such notification to the Office of Emergency Services by any person that causes or allows a sewage discharge to waters of the State:
• A spill equal to 1,000 gallons or more that discharges (or has a potential to discharge) to waters of the State, or a drainage conveyance system that discharges to waters of the State; or
• A spill of any volume to surface waters.

5.17. Unintended Failure to Report
If an Enrollee becomes aware that they unintentionally failed to submit relevant facts in any report required in this General Order, the Enrollee shall promptly notify Regional Water Board and State Water Board staff. Regional Water Board contact information is included in Attachment F of this Order. State Water Board staff shall be contacted by email at [email protected] for assistance in formally amending the corresponding report(s) in the online CIWQS Sanitary Sewer System Database.

5.18. Duty to Report to Water Boards
In accordance with Water Code section 13267 and/or section 13383, upon request by the State Water Board Executive Director (or designee) or a Regional Water Board Executive Officer (or designee), the Enrollee shall provide the requested information which the State or Regional Water Board deems necessary to determine compliance with this General Order.

5.19. Operation and Maintenance
To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.

6. PROVISIONS

6.1. Enforcement Provisions
The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.

6.1.1. Enforceability of Clean Water Act and Water Code Violations Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential PAGE 457 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
28 violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board. Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the Enrollee to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the Enrollee to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.

6.1.2. Monetary Penalties
The Water Code provides the State and Regional Water Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of this General Order and violations of the Clean Water Act.

6.1.3. Falsifying or Failure to Report
The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this General Order, or falsifying any information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. Any person who knowingly fails or refuses to furnish technical or monitoring program reports or falsifies any information provided in reports required by this General Order is subject to criminal penalties.

6.1.4. Severability of General Order
The provisions of this General Order are severable; if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Order shall not be affected thereby.

6.1.5. Indirect Discharges
In the event that a spill enters into a drainage conveyance system, the Enrollee shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not inadvertently impact beneficial uses of the receiving water body.

6.1.6. Water Boards’ Considerations for Discretionary Enforcement Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to contain, control, clean up, and mitigate spills. In assessing the factors, the State Water Board or the applicable Regional Water Board will consider:

PAGE 458 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
29 • The Enrollee’s compliance with this General Order with a focus on compliance with reporting requirements;
• The Enrollee’s provision of adequate funding to implement the requirements of this General Order;
• The Enrollee’s compliance with providing a complete and updated Sewer System Management Plan;
• The Enrollee’s compliance with implementing its Sewer System Management Plan; • The overall effectiveness of the Enrollee’s Sewer System Management Plan with respect to:
o System management, operation, and maintenance,
o Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent spills (e.g. adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow, etc.),
o Preventive maintenance (including cleaning, root grinding, and fats, oils, and grease control) and source control measures,
o Implementation of backup equipment,
o Inflow and infiltration prevention and control,
o Appropriate sanitary sewer system capacity to prevent spills, and o The Enrollee’s responsiveness to stop and mitigate the impact of the discharge; • The Enrollee’s compliance with identifying the cause of the spill; • The Enrollee’s use of available information and observations to accurately estimate the spill volume and identify the affected or potentially affected receiving waters; • The Enrollee’s thoroughness of cleaning up sewage in drainage conveyance systems after the spill(s);
• The Enrollee’s use of water quality and biological monitoring and assessment to determine the short-term and long-term impacts to beneficial uses and the environment;
• The Enrollee’s follow up actions to improve system performance; • The Enrollee’s implementation of feasible alternatives to prevent spills, such as:
o Use of temporary storage or waste retention,
o Reduction of system inflow and infiltration,
o Collection and hauling of waste to a treatment facility, o Prevention of and/ or containment of spills due to a design storm event identified in the Enrollee’s Sewer System Management Plan,
PAGE 459 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
30 o Implementation of available equipment, technologies, strategies, and recommended industry practices for maintaining and managing sewer systems to prevent spills, and contain and eliminate discharges to waters of the State; and • The spill duration and factors beyond the reasonable control of the Enrollee causing the event.

6.1.7. Enforcement Discretion Based on Reporting Compliance Consistent with the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383. When assessing Water Code section 13227 factors, the State Water Board or the applicable Regional Water Board will consider:
• The Enrollee’s diligence to comply with all reporting requirements in this General Order;
• The use of best available information for the Enrollee’s reporting of spill start date and start time in which the release of sewage from the sanitary sewer system initiated;
• The Enrollee’s reporting of spill end date, and end time to be the date and time in which the release of sewage from the sanitary sewer system was stopped; • The Enrollee’s diligence to accurately estimate and report spill volumes; • The Enrollee’s subsequent verification and/or updates to initial Draft Spill Reports in accordance with this General Order; and
• The Enrollee’s timely certification of required spill reports.

Consistent with Water Code section 13267 and section 13383, the State Water Board or a Regional Water Board may require an Enrollee to report the results of a condition assessment of a specified portion of the Enrollee’s sanitary sewer system.

6.2. Other Regional Water Board Orders
It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. This Order will not be interpreted or applied:
• In a manner inconsistent with the federal Clean Water Act; • To authorize a spill or discharge that is illegal under either the Clean Water Act, the Water Code, and/or an applicable Basin Plan prohibition or water quality standard; • To prohibit a Regional Water Board from issuing an individual National Pollutant Discharge Elimination System (NPDES) permit or individual waste discharge requirements superseding an Enrollee’s regulatory coverage under this General Order for a sanitary sewer system authorized under the Clean Water Act or Water Code;
PAGE 460 of 623

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
31 • To supersede any more specific or more stringent waste discharge requirements or enforcement orders issued by a Regional Water Board; or • To supersede any more specific or more stringent state or federal requirements in existing regulation, an administrative/judicial order, or Consent Decree.

6.3. Sewer System Management Plan Availability
The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

6.4. Entry and Inspection

6.4.1. Entry and Availability of Information
The Enrollee shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
• Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the requirements of this General Order; • Have access to and reproduce any records required to be maintained by this General Order;
• Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations required in this General Order; and • Sample or monitor substances or parameters for assuring compliance with this General Order, or as otherwise authorized by the Water Code.

6.4.2. Pre-Inspection Questionnaire
The Enrollee shall provide pre-inspection information to State and Regional Water Board staff through the completion of a Pre-Inspection Questionnaire provided by Water Board staff.

PAGE 461 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 1

ATTACHMENT A - DEFINITIONS
Annual Report
An Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) is a mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

Basin Plan
A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.

Beneficial Uses
The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

California Integrated Water Quality System (CIWQS)
CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter
A Data Submitter is an individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.

Disadvantaged Community
A disadvantaged community is a community with a median household income of less than eighty percent (80%) of the statewide annual median household income.

For the purpose of this General Order, there is no differentiation between a small and large disadvantaged community.

Drainage Conveyance System
A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.

PAGE 462 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 2
Enrollee
An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
• greater than one (1) mile in length (each individual sanitary sewer system); • one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Environmentally Sensitive Area
An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.

Exfiltration
Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Flood Control Channel
A flood control channel is a channel used to convey stormwater and non-stormwater flows through and from areas for flood management purposes.

Governing Entity
A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board;
• A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Hydrologically Connected
Two waterbodies are hydrologically connected when one waterbody flows, or has the potential to flow, into the other waterbody. For the purpose of this General Order, groundwater is hydrologically connected to a surface water when the
groundwater feeds into the surface water. (The surface
waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.)
PAGE 463 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 3
Lateral (including Lower and Upper Lateral)
A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership.

A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations.

An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official
A Legally Responsible Official is an official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by this General Order.

Nuisance
For the purpose of this General Order, a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and
• Occurs during, or as a result of, the treatment or disposal of wastes.

Private Sewer Lateral
A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

Private Sanitary Sewer System
A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.

Potential to Discharge, Potential Discharge
Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

PAGE 464 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 4
Receiving Water
A receiving water is a water of the State that receives a discharge of waste.

Resilience
Resilience is the ability to recover from or adjust to adversity or change, and grow from disruptions. Resilience can be built through planning, preparing for, mitigating, and adapting to changing conditions.

Sanitary Sewer System
A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of this Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System
A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan
A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.

Sewage
Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill
A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under this General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Training
Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with this General Order.

PAGE 465 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 5
Wash Down Water
Wash down water is water used to clean a spill area.

Waste
Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID)
A waste discharge identification number (WDID) identifies each individual sanitary sewer system enrolled under this General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State
Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.

Waters of the State include waters of the United States.

Waters of the United States
Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective
A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

PAGE 466 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT

1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________

2. Applicant Information:

Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address:________________________________________________________ City, State, Zip:_________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________

3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity

4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:

Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ PAGE 467 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2

5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________

6. Application Fee:

The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:

State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program

7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ PAGE 468 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 1

ATTACHMENT C - NOTICE OF TERMINATION

1. Enrollee Information
Enrollee Name: ___________________________________________________________ WDID No:________________________________________________________________ Legally Responsible Official Requesting Termination of Coverage: ___________________ First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ Mailing Address: __________________________________________________________ City, State, Zip: ___________________________________________________________ County: _________________________________________________________________ Sanitary Sewer System Name(s) or Unique Identifier(s): ___________________________ Regional Water Quality Control Board(s): _______________________________________ Signature and Date:________________________________________________________

2. Basis of Termination
Explanation of termination, including subsequent regulatory coverage and subsequent owner/operator of enrolled sanitary sewer system, as applicable:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ PAGE 469 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 2

3. Regulatory Coverage Termination Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge: 1) the sanitary sewer system I officially represent is not required to be regulated under the Statewide Waste Discharge Requirements for Sanitary Sewer Systems Order 2022-XXXX-DWQ, and 2) the information submitted in this Notice of Termination is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. Additionally, I understand that the submittal of this Notice of Termination does not release sanitary sewer system agencies from liability for any violations of the Clean Water Act.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ For State Water Board Use Only
☐ Approved for Termination ☐ Denied and Returned to Enrollee Deputy Director of Water Quality Signature: _____________________________________ Date: ____________________Notice of Termination Effective Date: __________________ PAGE 470 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 1
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS Table of Contents

1. Sewer System Management Plan Goal And Introduction ............................................D-2

1.1. Regulatory Context ...........................................................................................D-2

1.2. Sewer System Management Plan Update Schedule.........................................D-3

1.3. Sewer System Asset Overview .........................................................................D-3

2. Organization ................................................................................................................D-3

3. Legal Authority.............................................................................................................D-4

4. Operation And Maintenance Program..........................................................................D-4

4.1. Updated Map of Sanitary Sewer System ..........................................................D-4

4.2. Preventive Operation and Maintenance Activities .............................................D-4

4.3. Training .............................................................................................................D-5

4.4. Equipment Inventory .........................................................................................D-5

5. Design And Performance Provisions ...........................................................................D-5

5.1. Updated Design Criteria and Construction Standards and Specifications.........D-5

5.2. Procedures and Standards................................................................................D-5

6. Spill Emergency Response Plan..................................................................................D-6

7. Sewer Pipe Blockage Control Program........................................................................D-7

8. System Evaluation, Capacity Assurance and Capital Improvements...........................D-7

8.1 System Evaluation and Condition Assessment.................................................D-7

8.2. Capacity Assessment and Design Criteria ........................................................D-8

8.3. Prioritization of Corrective Action ......................................................................D-9

8.4. Capital Improvement Plan.................................................................................D-9

9. Monitoring, Measurement and Program Modifications.................................................D-9

10. Internal Audits............................................................................................................D-10

11. Communication Program ...........................................................................................D-10 PAGE 471 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 2
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS A Sewer System Management Plan (Plan) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This Plan may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a Sewer System Management Plan addressing the requirements of this Attachment is an enforceable component of this General Order. As specified in Provision 6.1 (Enforcement Provisions) of this General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective Sewer System Management Plan to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of this General Order.

This Attachment includes the following required elements that the Enrollee shall address in its Plan and subsequent updates. The Enrollee shall identify any requirement in this Attachment that is not applicable to the Enrollee’s sewer system and shall explain in its Plan why the requirement is not applicable.

1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.

The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.

PAGE 472 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 3

1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s upto-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.

2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order; • The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county PAGE 473 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 4
health officer, county environmental health agency, and State Office of Emergency Services.)

3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
PAGE 474 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 5
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.

The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

PAGE 475 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 6

6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State;
• Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

PAGE 476 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 7

7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances; • A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;
• An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
PAGE 477 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 8
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
PAGE 478 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 9
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Planimplementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element;
• Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

PAGE 479 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 10

10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.

11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.

PAGE 480 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information........................................................................... E1-4

1.3. Notification of Spill Report Updates................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................E1-5

2.4. Safety and Access Exceptions ........................................................................E1-8

3. Reporting Requirements ............................................................................................E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting .................E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ...............E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills..................................E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills..................................E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills ..................................E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills .............E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map...................E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)..................................................................E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................E1-19

3.11. Sewer System Management Plan Reporting Requirements .........................E1-19

4. Recordkeeping Requirements .................................................................................E1-20

4.1. Recordkeeping Time Period..........................................................................E1-20

4.2. Availability of Documents ..............................................................................E1-20

4.3. Spill Reports..................................................................................................E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills .......E1-21

4.5. Sewer System Telemetry Records................................................................E1-22

4.6. Sewer System Management Plan Implementation Records .........................E1-22

4.7. Audit Records................................................................................................E1-23 PAGE 481 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records.......................................................................................E1-23

4.9. Work Orders..................................................................................................E1-23 PAGE 482 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board (State Water Board) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.

PAGE 483 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.

PAGE 484 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.

For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

2.3. Receiving Water Monitoring

2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), PAGE 485 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 6
o Discoloration of receiving water, and
o Impact to the receiving water.

2.3.2. Receiving Water – Water Quality Sampling and Analysis For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the Enrollee shall conduct the following water quality sampling no later than 18 hours after the Enrollee’s knowledge of a potential discharge to a surface water:
• Collect one water sample, each day of the duration of the spill, at:
o The DCS-001 location as described in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment, if sewage discharges to a surface water via a drainage conveyance system; and/or
o Each of the three receiving water sampling locations in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment;
If the receiving water has no flow during the duration of the spill, the Enrollee must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The Enrollee shall analyze the collected receiving water samples for the following constituents per section 2.3.3 (Water Quality Analysis Specifications) of this Attachment:
• Ammonia, and
• Appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives, including one or more of the following, unless directed otherwise by the Regional Water Board:
o Total Coliform Bacteria
o Fecal Coliform Bacteria
o E-coli
o Enterococcus
Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The Enrollee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.

PAGE 486 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 7

2.3.3. Water Quality Analysis Specifications
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).

Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of this General Order, a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per this General Order must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

2.3.4. Receiving Water Sampling Locations
The Enrollee shall collect receiving water samples at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling
Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1
Sampling
Location Sampling Location Description
RSW-001
Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstream of Point
of Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.

PAGE 487 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 8
Sampling
Location Sampling Location Description
RSW-001D:

Downstream of
Point of Discharge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.
1 The Enrollee must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume.

2.4. Safety and Access Exceptions
If the Enrollee encounters access restrictions or unsafe conditions that prevents its compliance with spill response requirements or monitoring requirements in this General Order, the Enrollee shall provide documentation of access restrictions and/or safety hazards in the corresponding required report.

3. REPORTING REQUIREMENTS
All reporting required in this General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in this General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of this General Order.

The Enrollee shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

3.1. Reporting Requirements for Individual Category 1 Spill Reporting

3.1.1. Draft Spill Report for Category 1 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 1 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;
PAGE 488 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 9

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

3.1.2. Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
PAGE 489 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 10

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15.Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

16.Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

3.1.3. Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Enrollee shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
o Complete and detailed explanation of how and when the spill was discovered; PAGE 490 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 11
o Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;
o Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
o Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; o Detailed description of the spill cause(s);
o Description of the pipe material, and estimated age of the pipe material, at the failure location;
o Description of the impact of the spill;
o Copy of original field crew records used to document the spill; and o Historical maintenance records for the failure location.

2. Enrollee’s response to the spill:
o Chronological narrative description of all actions taken by the Enrollee to terminate the spill;
o Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and o Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and ▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
o Description of all water quality sampling activities conducted; o List of pollutant and parameters monitored, sampled and analyzed; as required in section 2.3 (Receiving Water Monitoring) of this Attachment; o Laboratory results, including laboratory reports;
o Detailed location map illustrating all water quality sampling points; and o Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

PAGE 491 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 12

3.1.4. Amended Certified Spill Reports for Individual Category 1 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.2. Reporting Requirements for Individual Category 2 Spill Reporting

3.2.1. Draft Spill Report for Category 2 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 2 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system; PAGE 492 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 13
o Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

3.2.2. Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and
PAGE 493 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 14

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.3. Monthly Certified Spill Reporting for Category 3 Spills The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry locations(s); o Estimated spill volume fully recovered from the drainage conveyance system; and PAGE 494 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 15
o Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
▪ Adjusted schedule/method of preventive maintenance,
▪ Planned rehabilitation or replacement of sanitary sewer asset, ▪ Inspected, repaired asset(s), or replaced defective asset(s), ▪ Capital improvements,
▪ Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
▪ Description of spill response activities,
PAGE 495 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 16
▪ Spill response completion date, and
▪ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

3.4. Monthly Certified Spill Reporting for Category 4 Spills The Enrollee shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

3.5. Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the Enrollee may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The Enrollee shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall:
• Maintain records per section 4.4. of this Attachment; The Enrollee shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after PAGE 496 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 17
the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of this Attachment) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the Enrollee has no further spills of any category, in the subsequent calendar month, the Enrollee shall certify “no-spills” for the subsequent calendar month.

If the Enrollee has no spills from its systems during a calendar month, but the Enrollee voluntarily reported a spill from a private lateral or a private system, the Enrollee shall certify “no-spills” for that calendar month.

If the Enrollees has spills from its owned and/or operated laterals during a calendar month, the Enrollee shall not certify “no spills” for that calendar month.

3.8. Electronic Sanitary Sewer System Service Area Boundary Map The Legally Responsible Official shall submit, to the State Water Board, an up-to-date electronic spatial map of its sewer system service area boundaries. The map must be in accordance with section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order and the specification provided on the statewide Sanitary Sewer Systems program website. The map must include the location of wastewater treatment facility(ies) that treats the sewer system waste, if in the same sewer service boundary.

By the Effective Date of this General Order, specifications for the electronic sanitary sewer service area boundary map format will be provided on the statewide Sanitary Sewer Systems Order program website.

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
A new Enrollee shall complete and submit its first certified Annual Report into the online CIWQS Sanitary Sewer System Database, within 30 days of obtaining a CIWQS account; Subsequent Annual Reports are due by April 1 of each year.

All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS;
The Annual Report must address, and update as applicable, the following items:
• Population served;
PAGE 497 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 18
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order; • Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee,
o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste;
• Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system;
• Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); PAGE 498 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 19
• System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

3.11. Sewer System Management Plan Reporting Requirements For an Existing Enrollee previously regulated by Order 2006-0003-DWQ: Within every six (6) years after the required due date of its last Plan Update, the Legally Responsible Official shall upload and certify a local governing entity-approved Sewer System Management Plan Update to the online CIWQS Sanitary Sewer System Database. If the electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its updated Sewer System Management Plan posted on its own website.

Order 2006-0003-DWQ required each enrollee to develop its initial Sewer System Management Plan per the following schedule, with required Plan updates at a frequency of 5-years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2009 Between 100,000 and 10,000: August 2, 2009
Between 10,000 and 2,500: May 2, 2010
Less than 2,500: August 2, 2010
PAGE 499 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 20
This Order carries forth the previously-required Plan Update schedule per Order 2006-0003-DWQ. Per the six-year Plan Update frequency required in this Order, the Enrollee shall upload and certify its first Plan Update, to the online CIWQS Sanitary Sewer System Database by the following due dates, with subsequent Plan Updates at the frequency of six years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2025 Between 100,000 and 10,000: August 2, 2025
Between 10,000 and 2,500: May 2, 2026
Less than 2,500: August 2, 2026
For a New Enrollee: Within twelve (12) months of its Application for Enrollment Approval date, the Legally Responsible Official of a new Enrollee shall upload and certify a local governing entity-approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database. If electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its Sewer System Management Plan posted on its own website. The due date for subsequent 6-year Plan updates, is six (6) years from the submittal due date of the new Enrollee’s first Sewer System Management Plan.

4. RECORDKEEPING REQUIREMENTS
The Enrollee shall maintain records to document compliance with the provisions of this General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by an Enrollee’s contractor(s).

4.1. Recordkeeping Time Period
The Enrollee shall maintain records of documents required in this Attachment, including records collected for compliance with this General Order, and records collected in accordance with previous General Order 2006-0003-DWQ, for five (5) years.

4.2. Availability of Documents
The Enrollee shall make the records required in this General Order readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.3. Spill Reports
The Enrollee shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the Enrollee responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification,
PAGE 500 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 21
o Date and time the complainant first noticed the spill, if available, o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available,
o Complainant’s contact information, if available, and
o Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the Enrollee, using all available information, to comply with this General Order, and previous General Order 2006-0003-DWQ as applicable;
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements in this Attachment.

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills An Enrollee must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 Enrollee-owned and/or operated lateral spill, and report in accordance to section 3.6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills) of this Attachment.

Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
o Description of drainage conveyance system location,
o Estimated spill volume fully recovered within the drainage conveyance system, and
o Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:

PAGE 501 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 22
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, ongoing spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

Recordkeeping of Individual Lateral Spill Information:

1. Date and time the Enrollee was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
o Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
o System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.5. Sewer System Telemetry Records
The Enrollee shall maintain the following sewer system telemetry records if used to document compliance with this General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes;
• Computerized maintenance management system records; and • Asset management-related records.

4.6. Sewer System Management Plan Implementation Records The Enrollee shall maintain records documenting the Enrollee’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

PAGE 502 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 23

4.7. Audit Records
The Enrollee shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and
• Follow-up actions based on audit findings.

4.8. Equipment Records
The Enrollee shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.9. Work Orders
The Enrollee shall maintain record of work orders for operations and maintenance projects.

PAGE 503 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 1
ATTACHMENT E2 – SUMMARY OF NOTIFICATION, MONITORING AND REPORTING

REQUIREMENTS
This Attachment provides a summary of notification, monitoring and reporting requirements, by spill category, and for Enrollee-owned and/or operated laterals as required in Attachment E1 of this General Order, for quick reference purposes only.

Table E2-1
Spill Category 1: Spills to Surface Waters
Spill
Requirement Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:

Notify the California Office of Emergency Services
and obtain a notification control number.

California Office
of Emergency
Services at:
(800) 852-7550
(Section 1 of
Attachment E1)
Monitoring
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the receiving
water within 18 hours of initial knowledge of spill of
50,000 gallons or greater to surface waters.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date;
• Submit Technical Report within 45 calendar days
after the spill end date for a Category 1 spill in
which 50,000 gallons or greater discharged to
surface waters; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.1 of
Attachment E1)
PAGE 504 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 2
Table E2-2
Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters of
the State:

Notify California Office of Emergency Services and
obtain a notification control number.

California Office of
Emergency
Services at: (800)
852-7550
(Section 1 of
Attachment E1)
Monitoring Conduct spill-specific monitoring.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.2 of
Attachment E1)
PAGE 505 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 3
Table E2-3
Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• Submit monthly Certified Spill Report to the online
CIWQS Sanitary Sewer System Database within
30 calendars days after the end of the month in
which the spills occur; and
• Submit Amended Spill Reports within 90 calendar
days after the Certified Spill Report due date.
(Section 3.3 and 3.5 of
Attachment E1)
Table E2-4
Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring.
(Section 2 of Attachment
E1)
Reporting
• If, during any calendar month, Category 4 spills
occur, certify monthly, the estimated total spill
volume exiting the sanitary sewer system, and the
total number of all Category 4 spills into the online
CIWQS Sanitary Sewer System Database, within
30 days after the end of the calendar month in
which the spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.
(Section 3.4, 3.6, 3.7
and 4.4 of Attachment
E1)
PAGE 506 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 4
Table E2-5
Enrollee Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of a
spill of 1,000 gallons or greater, from an enrolleeowned and/or operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Not applicable to a spill of less than 1,000 gallons.

California Office of
Emergency Services
at: (800) 852-7550
(Section 1 of Attachment
E1)
Monitoring Conduct visual monitoring. (Section 2 of Attachment E1)
Reporting
• Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary
Sewer System Database, by February 1st after the
end of the calendar year in which the spills occur.
• Report a lateral spill of any volume that discharges
to a surface water as a Category 1 spill.
(Sections 3.6, 3.7 and

4.4 of Attachment E1)
PAGE 507 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 1
ATTACHMENT F – REGIONAL WATER QUALITY CONTROL BOARD CONTACT

INFORMATION
This Attachment provides a map, list of counties, and contact information to assist the Enrollee in identifying the corresponding Regional Water Quality Control Board office, for all Regional Water Board notification requirements in this General Order.

Region 1 -- North Coast Regional Water Quality Control Board:

Del Norte, Glenn, Humboldt, Lake, Marin, Mendocino, Modoc, Siskiyou, Sonoma, and Trinity counties.

[email protected] or (707) 576-2220
Region 2 -- San Francisco Bay Regional Water Quality Control Board:

Alameda, Contra Costa, San Francisco, Santa Clara (Northern most part of Morgan Hill), San Mateo, Marin, Sonoma, Napa, Solano counties.

[email protected] or (510) 622-2369
Region 3 -- Central Coast Regional Water Quality Control Board:

Santa Clara (most of Morgan Hill), San Mateo (Southern portion), Santa Cruz, San Benito, Monterey, Kern (small portions), San Luis Obispo, Santa Barbara, Ventura (Northern portion) counties.

[email protected] or (805) 549-3147
Region 4 -- Los Angeles Regional Water Quality Control Board:

Los Angeles, Ventura counties (small portions of Kern and Santa Barbara counties). [email protected] or (213) 576-6600
PAGE 508 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 2
Region 5 -- Central Valley Regional Water Quality Control Board:

Rancho Cordova (Sacramento) Office: Colusa, Lake, Sutter, Yuba, Sierra, Nevada, Placer, Yolo, Napa, (North East), Solano (West), Sacramento, El Dorado, Amador, Calaveras, San Joaquin, Contra Costa (East), Stanislaus, Tuolumne counties.

[email protected] or (916) 464-3291 Fresno Office: Fresno, Kern, Kings, Madera, Mariposa, Merced, and Tulare counties, and small portions of San Benito and San Luis Obispo counties.

[email protected] or (559) 445-5116 Redding Office: Butte, Glen, Lassen, Modoc, Plumas, Shasta, Siskiyou, and Tehama counties.

[email protected] or (530) 224-4845 Region 6 -- Lahontan Regional Water Quality Control Board:

Lake Tahoe Office: Alpine, Modoc (East), Lassen (East side and Eagle Lake), Sierra, Nevada, Placer, El Dorado counties.

[email protected] or (530) 542-5400 Victorville Office: Mono, Inyo, Kern (East), San Bernardino, Los Angeles (North East corner) counties.

[email protected] or (760) 241-6583 Region 7 -- Colorado River Basin Regional Water Quality Control Board:

Imperial county and portions of San Bernardino, Riverside, San Diego counties.

[email protected] or (760) 346-7491
Region 8 -- Santa Ana Regional Water Quality Control Board:

Orange, Riverside, San Bernardino counties.

[email protected] or (951) 782-4130
Region 9 -- San Diego Regional Water Quality Control Board:

San Diego county and portions of Orange and Riverside counties.

[email protected] or (619) 516-1990
End of Order 2022-0103-DWQ
PAGE 509 of 623
Appendix B
Chapter 14.15 of the City’s Municipal Code
PAGE 510 of 623
PAGE 511 of 623







 


!"#$#%#&$' 

(
)*+ #',&'-./0'%!1'23$'%-..-%#&$4!56#7!8 

9 )*+ #',&'-./0'%!1'23$'%-..-%#&$4!56#7!1!$%' 


:;#'%#$<)*+ #',&'-./0'%!1' 


!,&'#%*"=!7%-#$/6>'%-$?!'@7&A#>#%!8 


:)3B3C3*B/
DEFGHIIHJKLMFJHNOPFQLOFRDNQPEPSFJDELFTPEOFKLFUDKPFQNUKVIESFPDQIIFDQWEFUDEFGHIIHJKLMFXEQLKLMP NEPREVUKWEIYFQPVNKZEOFUHFUDEXFKLFUDKPFPEVUKHL [\]^_`Fa^bFaa^FDEFOKNEVUHNFHGFRIQLLKLMFQLOFZTKIOKLMFHNFDKPFHNFDEN OEPKMLEEc adF`e[fFgbF[FRITXZKLMFQRRTNUELQLVEFHNFQRRIKQLVEFUDQUFKPFKLPUQIIEOFKLFQFPQLKUQNY ONQKLQMEFPYPUEXFUHFKLUENVERUFGQUPSFHKIPFQLOFMNEQPEPFGNHXFQFJQPUEJQUENFOKPVDQNMESFKLVITOKLMFQFMNQWKUY MNEQPEFKLUENVERUHNFHNFDYONHXEVDQLKVQIFMNEQPEFKLUENVERUHNc a[SFfF[`Fd^[F^FadFHLREUNHIETXFHNMQLKVFRHIQNFVHXRHTLOPFOENKWEOFGNHXFQLKXQI QLOhHNFRIQLUFPHTNVEPFUDQUFVHLUQKLFXTIUKRIEFVQNZHLFVDQKLFUNKMIYVENKOEFXHIEVTIEPcFDEFPTZPUQLVEPFQNE OEUEVUQZIEFQLOFXEQPTNQZIEFTPKLMFQLQIYUKVQIFRNHVEOTNEPFEPUQZIKPDEOFKLFRQNUFijkFHGFUKUIEFlmFHGFUDEF\LKUEO UQUEPFVHOEFHGFGEOENQIFNEMTIQUKHLPSFQPFXQYFZEFQXELOEOFGNHXFUKXEFUHFUKXEc a`F^nF[of]bF[FGQVKIKUYFELMQMEOFKLFRNERQNKLMFGHHOFGHNFVHLPTXRUKHLFZYFUDE RTZIKVFPTVDFQPFQFNEPUQTNQLUSFZQpENYSFVHXXENVKQIFpKUVDELSFVQUENENSFDHUEISFPVDHHISFNEIKMKHTPFKLPUKUTUKHLS DHPRKUQISFRNKPHLSFVHNNEVUKHLQIFGQVKIKUYSFHNFVQNEFKLPUKUTUKHLc d^[ngFd^[F^e^F[FRITXZKLMFQRRTNUELQLVEFHNFQRRIKQLVEFUDQUFKPFKLPUQIIEOFKLFQ PQLKUQNYFONQKLQMEFPYPUEXFUHFKLUENVERUFGQUPSFHKIPFQLOFMNEQPEPFGNHXFQFJQPUEJQUENFOKPVDQNMEFQLOFKP KOELUKGKEOFZYFWHITXESFUDKNUYFqjmrFXKLTUEFNEUELUKHLFUKXESFZQGGIEqPrSFQFXKLKXTXFHGFUJHFqsrFVHXRQNUXELUPSFQ XKLKXTXFUHUQIFWHITXEFHGFPEWELFDTLONEOFGKGUYFqtumrFMQIIHLPSFQLOFMNQWKUYFPERQNQUKHLc d^[F^bn[fF`nF[LYFDYONHXEVDQLKVQIFMNEQPEFKLUENVERUHNFUDQUFQTUHXQUKVQIIYFQLO XEVDQLKVQIIYFNEXHWEPFGQUPSFHKIPFQLOFMNEQPEPFGNHXFUDEFKLUENVERUHNSFUDEFVHLUNHIFHGFJDKVDFKPFEKUDEN QTUHXQUKVFHNFXQLTQIIYFKLKUKQUEOc ]g`^b][[fFd^[F^e^F[FRITXZKLMFQRRTNUELQLVEFHNFQRRIKQLVEFUDQUFKP KLPUQIIEOFKLFQFPQLKUQNYFONQKLQMEFPYPUEXFUHFKLUENVERUFGQUPSFHKIPFQLOFMNEQPEPFGNHXFQFJQPUEJQUENFOKPVDQNME QLOFKPFKOELUKGKEOFZYFGIHJFNQUEFQLOFPERQNQUKHLFQLOFNEUELUKHLFEGGKVKELVYcFDEFOEPKMLFKLVHNRHNQUEPFQKN ELUNQKLXELUSFDYONHXEVDQLKVQIFPERQNQUKHLSFKLUENKHNFZQGGIKLMSFQLOhHNFZQNNKENPFKLFVHXZKLQUKHLFHN PERQNQUEIYSFQLOFHLEFHGFUDEFGHIIHJKLM FFF[cFFFvUENLQIFGIHJFVHLUNHISFJKUDFQKNFKLUQpEFqWELUrF`KNEVUIYFVHLLEVUEOc FFFocFFFvUENLQIFGIHJFVHLUNHISFJKUDHTUFQKNFKLUQpEFqWELUrF`KNEVUIYFVHLLEVUEOc FFFcFFFwKUDHTUFEvUENLQIFGIHJFVHLUNHIF`KNEVUIYFVHLLEVUEOc PAGE 512 of 623 








 





 !"#!$#%&'()*+(,-./*.01(.2.345.6(-7.301103-*7(849:-84,'  ; 

;

< 
<


<
;
= ;
>;?
;
?

;

 @A?
 ?




;
;

<

; ;


<
>
? 
;
;
B;
A

A

;
B;
;A B  ;

?
=



< = ;





;
 

;
CD



< ?


;?

;
;
> 



 ;




; ;; ?

<
CD;A;
 ;; ?EA CD;A;
;; ?;?
>
@
;
;
@
?
;;; 
 F

G 

 ?

?

= ;
@
?

;A 

;A
 
?



?A

 ?





G



H
> ?A  >
A;

;


 
;?A


=
? 



<

;
<






 !"#!$#%I'()*+(,-./*.01(.2.345.6(-7.301103-*7(849:-845473.' CD;A; ;; ?;;
> 
;
 

;



? ;
;
 ;;> 

;A 




<
?






?=

=

;
;

<

; ;

?


 ;

@






;


<

;; JK
? 


<

; 

 A
;;

> 
;
 



;


<


 ;;;A 

AA
= >

G 

 ?

L?>
<

;

 @A?
 

 ; = ;
> A
= 

AA
= A 

;
 


<  = 
 = ;;

> <






  CD;A;
;; ? MD

;
?=
 = ;;
> 
;
 
;A
= 

? 


<

; 

 A
; 
;>; 
J;; 



A
=;

 ;

< 
?= 
;
;

 <

; ;
;> ; 


;


<

;

; 



A
 ;
<

;


;A<

; 




;
A

B
<;

>
;
;
;
?


;
; 
B;
;
;

<
;

;A
  
?



>;
?

; ND

=<

; 

 A
;;
> 
;
 ;  ;





< B

 

;


<

; 






<
; 
;A 

?





;
=
< 

 ;


 ;;
;
AA
= > 


 

O  = ;;
>  ;<


;G 



;
;

<

; ;

?

;

>
?= >A?A
< 

 A

;
@
>

G 

 ?


<

= <

; 

 A
;;
> @AA 

AA
= ;
?A >






 !"#!$#%"'(4P-.3-7+()*+(,-./*.01(.2.345.' Q
;
<CD;A;
;; ?;?

?


;
= A
= ;;; ?;

A
A
?



   = 
 CD;

< ;

A


<

<

 ;<
A

? 
;


=
 >




?


AA
= >

G 

 ?

O

G

 ;
A
 

G 

 ?


? ;
>;
<;

< ?

;?

@
 ?




< ?





A
 ?

CD;A;
;; ?A
   ;



; 
;; ?
?>B
< ;
=
;





 !"#!$#%$'(,4/*.-3(*)(R4830-7(.:S.307R4.(/8*T-S-34,' UA ;
;
A



;

< 
 A;


; 
A
?> A
 



;

< 
 A; 

A>; 

?


; 




; 
<

@
; 

B




<
;
;

<

; ;<
>;

 ;
?

?


 

?
< 




A
=
  = ; 


?

 ;;
 

@

@

A





<
;
<;; 



 ;
? A

= 





 PAGE 513 of 623

INTENTIONALLY LEFT BLANK
PAGE 514 of 623
Appendix C
Chapter 16.03 of the City’s Municipal Code
PAGE 515 of 623

INTENTIONALLY LEFT BLANK
PAGE 516 of 623
ARTICLE 03

STREET IMPROVEMENTS UNDER PRIVATE CONTRACT
SECTION:

16.03.01: Definition

16.03.02: Permission Required; Conditions

16.03.03: Deposits

16.03.04: Notice of Commencement of Work

16.03.05: Supervision and Inspection

16.03.01: DEFINITION:

The word "improvement", as used in this Article shall be deemed to mean and include the following:

A. Grading, paving, oiling or graveling.

B. The construction of sidewalks, curbs, gutters, driveway entrances, retaining walls, steps, bridges, culverts, catch basins, tunnels, subways or viaducts. C. The construction or installation of sanitary sewers, together with appurtenant manholes, flush tanks, tunnels and viaducts. D. The construction or installation of conduits, vaults, poles, channels or ditches for drainage purposes, together with appurtenant manholes, culverts, catch basins, tunnels or viaducts.

E. The construction or installation of pipes for domestic water supply and fire protection, together with appurtenant hydrants, tunnels or conduits.

F. All other work which may be deemed necessary to improve the whole or any portion of such streets, avenues, lanes, alleys, courts, places, public ways or property rights of way owned by the City. G. All other work auxiliary to any of the provisions of this Section which may be required to carry out the same. (1954 Code §19.21)

16.03.02: PERMISSION REQUIRED; CONDITIONS:

A. It shall be unlawful for any person, as principal, agent or contractor, to make any improvements in any of the streets of the City, by or under private contract, unless permission from the Director of Public Works therefor is first secured and unless the deposit required by Section 16.03.03 of this Article is made. (1954 Code §19.22; 1994 Code) B. Any permission granted by the Director of Public Works for the making of any improvement by or under private contract shall be deemed to have been made subject to the terms of this Article. (1954 Code §19.23; 1994 Code)

16.03.03: DEPOSITS:

A. Deposit Required:

1. Before any permission, as provided by Section 16.03.02 of this Article shall become effective for any purpose, there shall be deposited with the Director of Public Works such sum of money or, in lieu thereof, a certified check in like amount, as may be estimated by the Director of Public Works to be necessary to cover the cost of inspection and the supervision by their respective departments for the improvement.

2. Utilities operating under the jurisdiction of the Public Utilities Commission of the State are exempt from the requirements of this subsection. (1954 Code §19.25; 1994 Code) B. Deduction of City's Cost and Return of Remainder: Upon acceptance of the deposit required by subsection A above by the Director of Public Works, he/she shall deduct from the deposit the cost to the City of inspection and supervision thereof and such expenses as shall have been incurred by the Director of Public Works in connection with the improvement. The remainder of such deposit, if there is any, shall be returned to the person making the same upon demands approved, audited and allowed as in the case of other demands against the City. (1954 Code §19.26; 1994 Code) C. Additional Sums: In the event that the estimated cost of inspection and supervision of the private improvement of the Director of Public Works' expenses shall be too small and the deposit required by subsections A and B of this Section shall prove to be insufficient, the Director of Public Works may cause the work of making such improvements to be stopped until such additional sum is deposited as will cover such costs, in which case, it shall be unlawful to continue the work until such additional sum is deposited. (1954 Code §19.27; 1994 Code) D. Account of City Expenses Incurred: It shall be the duty of the City Engineer and the Director of Public Works to cause to be kept a just and true account of all expenses incurred by their respective departments in connection with private improvements as provided for by this Article. (1954 Code §19.29; 1994 Code)

16.03.04: NOTICE OF COMMENCEMENT OF WORK:

PAGE 517 of 623
The Director of Public Works shall be given at least twenty four (24) hours' notice, in writing, of the time of commencement of the work of making any private improvement, permission to make which is granted under the provisions of this Article, in order that he/she may procure and assign an inspector to inspect the same. In case the services of the City Engineer are required for laying out any portion of the work, twenty four (24) hours' notice shall be given the Director of Public Works of the time when such services shall be required. It shall be unlawful for any person, as principal, agent or contractor, to commence any such work until after the notice required by this Section has been given. (1954 Code §19.28; 1994 Code)

16.03.05: SUPERVISION AND INSPECTION:

A. Improvements coming under the provisions of this Article shall be made under the direction and to the satisfaction of the Director of Public Works, and all work shall, during its progress and on its completion, conform to the lines and levels which may, from time to time, be given or approved by the Director of Public Works. (1954 Code §19.24; 1994 Code) B. It shall be the duty of the Director of Public Works to cause the improvements made by or under private contract to be duly inspected and supervised during the progress of the work thereupon and otherwise to carry out the provisions of this Article. (1954 Code §19.30; 1994 Code)
PAGE 518 of 623
Appendix D
Chapter 16.06 of the City’s Municipal Code
PAGE 519 of 623

INTENTIONALLY LEFT BLANK
PAGE 520 of 623
ARTICLE 06

CONNECTION TO PUBLIC SEWERS
SECTION:

16.06.01: Required Connection To Public Sewers

16.06.02: Sewer Connection Charges

16.06.01: REQUIRED CONNECTION TO PUBLIC SEWERS:

Whenever the director of public works shall declare a sewer line available for connection, no person shall construct or enlarge or pump out a new or existing cesspool with regard to any property in the city; provided, however, that any person dissatisfied with such director's decision or failure to decide thereon may request a decision thereon by the city council. In the event the decision of such director or council finds the availability of a sewer line, then such person shall forthwith connect to such available sewer line. (1954 Code §19.42; amd. 1994 Code)

16.06.02: SEWER CONNECTION CHARGES:

Any person who desires to or is obliged to connect to any sewer installed at city in any place in the city shall pay a sewer connection charge to the city as set by city council resolution. (Ord. 0-07-1191, 10-10-2007) PAGE 521 of 623
Appendix E
Updated Sewer Collection System Map
PAGE 522 of 623

INTENTIONALLY LEFT BLANK
PAGE 523 of 623
PAGE 524 of 623
Appendix F
Notification Requirements
PAGE 525 of 623

INTENTIONALLY LEFT BLANK
PAGE 526 of 623
Appendix E Notification Requirements
F Notification Requirements
F-1 Notification of Spills of 1,000 Galloons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the City shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The City has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from a City-owned and/or operated laterals, to a water of the State.

The control number must be referred to in all communication, oral and written.

F-2 Spill Notification Information
The City shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services; • Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
g. Brief narrative of the spill event, and
h. Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks; • Name and phone number of contact person on-scene;
• Date and time the City was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

PAGE 527 of 623
Appendix E Notification Requirements
F-3 Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the City certifies the spill report in the online CIWQS Sanitary Sewer System Database, the City shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and • Additional impact(s) to the receiving water(s) and beneficial uses.

PAGE 528 of 623
Appendix G
Reporting Requirements
PAGE 529 of 623

INTENTIONALLY LEFT BLANK
PAGE 530 of 623
Appendix F Reporting Requirements
G Reporting Requirements
All reporting required in the General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in the General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of the General Order.

The City shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

G-1 Reporting Requirements for Individual Category 1
Spill Reporting
G-1-1 Draft Spill Report for Category 1 Spills
Within three (3) business days of the City’s knowledge of a Category 1 spill, the City shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:
a. Contact information: Name and telephone number of City contact person to respond to spill-specific questions; Spill location name;
Date and time the City was notified of, or self-discovered, the spill; Operator’s arrival time;
Estimated spill start date and time;
Date and time the City notified the California Office of Emergency Services, and the assigned control number; Description, photographs, and GPS coordinates of the system location where the spill originated; • If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;
Estimated total spill volume exiting the system;
Description and photographs of the extent of the spill and spill boundaries; Did the spill reach a drainage conveyance system? If Yes:

Description of the drainage conveyance system transporting the spill; Photographs of the drainage conveyance system entry location(s); Estimated spill volume fully recovered from the drainage conveyance system; Estimated spill volume remaining within the drainage conveyance system; Description and photographs of all discharge point(s) into the surface water; Estimated spill volume that discharged to surface waters; and PAGE 531 of 623
Appendix F Reporting Requirements
Estimated total spill volume recovered.

G-1-2 Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section F-1-1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;
Spill end date and time;
Description of how the spill volume estimations were calculated, including at a minimum:

1. The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and

2. The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
Spill cause(s) (for example, root intrusion, grease deposition, etc.); System failure location (for example, main, lateral, pump station, etc.); Description of the pipe material, and estimated age of the pipe material, at the failure location; Description of the impact of the spill;
Whether or not the spill was associated with a storm event; Description of spill response activities including description of immediate spill containment and cleanup efforts; Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent recurrence of the spill, and a schedule of major milestones for those steps; Spill response completion date;
Detailed narrative of investigation and investigation findings of cause of spill; Reasons for an ongoing investigation (as applicable) and the expected date of completion; Name and type of receiving water body(s);
Description of the water body(s), including but not limited to:

1. Observed impacts on aquatic life,

2. Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,

3. Responsible entity for closing/restricting use of water body, and

4. Number of days closed/restricted as a result of the spill.

Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

PAGE 532 of 623
Appendix F Reporting Requirements
G-1-3 Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the City shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:

2. Complete and detailed explanation of how and when the spill was discovered;

3. Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;

4. Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;

5. Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume;

6. Detailed description of the spill cause(s);

7. Description of the pipe material, and estimated age of the pipe material, at the failure location;

8. Description of the impact of the spill;

9. Copy of original field crew records used to document the spill; and

10. Historical maintenance records for the failure location.

City’s response to the spill:

1. Chronological narrative description of all actions taken by the City to terminate the spill;

2. Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and

3. Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and
▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

Water Quality Monitoring, including at minimum:

1. Description of all water quality sampling activities conducted;

2. List of pollutant and parameters monitored, sampled and analyzed; as required in Water Quality Monitoring Plan, once developed;

3. Laboratory results, including laboratory reports;

4. Detailed location map illustrating all water quality sampling points; and

5. Other regulatory agencies receiving sample results (if applicable).

Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

PAGE 533 of 623
Appendix F Reporting Requirements
G-1-4 Amended Certified Spill Reports for Individual Category 1 Spills The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

G-2 Reporting Requirements for Individual Category 2
Spill Reporting
G-2-1 Draft Spill Report for Category 2 Spills
Within three (3) business days of the City’s knowledge of a Category 2 spill, the City shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:
12 Contact information: Name and telephone number of City contact person to respond to spill-specific questions; Spill location name;
Date and time the City was notified of, or self-discovered, the spill; Operator’s arrival time;
Estimated spill start date and time;
Date and time the City notified the California Office of Emergency Services, and the assigned control number; Description, photographs, and GPS coordinates of the system location where the spill originated; If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;
Estimated total spill volume exiting the system;
Description and photographs of the extent of the spill and spill boundaries; Did the spill reach a drainage conveyance system? If Yes:

1. Description of the drainage conveyance system transporting the spill;

2. Photographs of the drainage conveyance system entry location(s);

3. Estimated spill volume fully recovered from the drainage conveyance system;

4. Estimated spill volume remaining within the drainage conveyance system;

5. Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and Estimated total spill volume recovered.

PAGE 534 of 623
Appendix F Reporting Requirements
G-2-2 Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section F-2-1 (Draft Spill Report for Category 2 Spills) above:

2. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;
Spill end date and time;
Description of how the spill volume estimations were calculated, including at a minimum:

6. The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and

7. The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
Spill cause(s) (for example, root intrusion, grease deposition, etc.); System failure location (for example, main, pump station, etc.); Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location; Description of the impact of the spill;
Whether or not the spill was associated with a storm event; Description of spill response activities including description of immediate spill containment and cleanup efforts; Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent recurrence of the spill, and a schedule of major milestones for those steps; Spill response completion date;
Detailed narrative of investigation and investigation findings of cause of spill; Reasons for an ongoing investigation (as applicable) and the expected date of completion; and Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

G-2-3 Amended Certified Spill Reports for Individual Category 2 Spills The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

PAGE 535 of 623
Appendix F Reporting Requirements
G-3 Monthly Certified Spill Reporting for Category 3 Spills The City shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator’s arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:

1. If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:

1. Description of the drainage conveyance system transporting the spill;

2. Photographs of the drainage conveyance system entry locations(s);

3. Estimated spill volume fully recovered from the drainage conveyance system; and

4. Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:

14. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and

15. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;
PAGE 536 of 623
Appendix F Reporting Requirements

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
a. Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
b. Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
i. Adjusted schedule/method of preventive maintenance,
ii. Planned rehabilitation or replacement of sanitary sewer assets, iii. Inspected, repaired asset(s), or replaced defective asset(s), iv. Capital improvements,
v. Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
vi. Description of spill response activities,
vii. Spill response completion date, and
viii. Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

G-4 Monthly Certified Spill Reporting for Category 4 Spills The City shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

G-5 Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the City may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification on why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

G-6 Annual Certified Spill Reporting of Category 4
and/or Lateral Spills
For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the City shall:
• Maintain records per section 4 of Attachment E1 of the General Order; The City shall provide records upon request by the State Water Board or Regional Water Board staff. • Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

PAGE 537 of 623
Appendix F Reporting Requirements
A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per Water Quality Monitoring Plan, once developed.

G-7 Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or City-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the City shall certify, within 30 calendar days after the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per Water Quality Monitoring Plan, once developed) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the City has no further spills of any category, in the subsequent calendar month, the City shall certify “no-spills” for the subsequent calendar month.

If the City has no spills from its systems during a calendar month, but the City voluntarily reported a spill from a private lateral or a private system, the City shall certify “no-spills” for that calendar month.

If the City has spills from its owned and/or operated laterals during a calendar month, the City shall not certify “no spills” for that calendar month.

G-8 Annual Report (Previously termed as Collection
System Questionnaire in General Order 2006-
0003-DWQ)
The City shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of the General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The City’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS; The Annual Report must address, and update as applicable, the following items:
• Population served;
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of the General Order;
• Number of system operation and maintenance staff:
i. Entry level (less than two years of experience),
j. Journey level (greater than two years of experience), k. Supervisory level, and
l. Managerial level;
PAGE 538 of 623
Appendix F Reporting Requirements
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
m. Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V); • System information:
n. Miles of system gravity and force mains,
o. Number of upper and lower service laterals connected to system, p. Estimated number of upper and lower laterals owned and/or operated by the City, q. Portion of laterals that is City’s responsibility,
r. Average age the major components of system infrastructure, s. Number and age of pump stations, and
t. Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste; • Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system; • Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system; • Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of the General Order; • Major spill causes (for example, root intrusion, grease deposition); • System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

PAGE 539 of 623
Appendix F Reporting Requirements

INTENTIONALLY LEFT BLANK
PAGE 540 of 623
Appendix H
Water Quality Monitoring Plan
PAGE 541 of 623

INTENTIONALLY LEFT BLANK
PAGE 542 of 623
City of San Marino
Sanitary Sewer Spill Water Quality
Monitoring Plan
DECEMBER 2024
Prepared for:

CITY OF SAN MARINO PARK AND PUBLIC WORKS DEPARTMENT
2200 Huntington Drive
San Marino, CA 91108
Contact: Amber Shah, P.E.

Prepared by:
605 Third Street
Encinitas, California 92024
Contact: Elizabeth Caliva, P.E.

PAGE 543 of 623

SANITARY SEWER SPILL MONITORING PLAN
i
DECEMBER 2024
Table of Contents
SECTION PAGE NO.
1 Introduction ..........................................................................................................................................................1 2 Background ..........................................................................................................................................................2

2.1 Spill Monitoring Plan Framework...........................................................................................................2

2.2 Geographic Setting.................................................................................................................................4

2.3 San Marino Assets..................................................................................................................................4

2.4 Potential Monitoring Locations..............................................................................................................6

2.5 Water Quality Sample Constituents ......................................................................................................7 3 Monitoring Site Selection ....................................................................................................................................9 4 Monitoring Procedures Overview ..................................................................................................................... 10

4.1 Manual Sample Collection.................................................................................................................. 10

4.2 Flow Rate Estimation via Float Velocity Method................................................................................ 11

4.3 Monitoring Equipment......................................................................................................................... 11

4.4 Water Quality Laboratory .................................................................................................................... 12 5 Site Access and Safety Considerations ........................................................................................................... 13 6 Summary ........................................................................................................................................................... 14 7 References ........................................................................................................................................................ 15

APPENDICES
A 2022 Waste Discharge Requirements Attachment E.1
B Example Chain of Custody Sheet
C Sewer Spill Visual Observation Log
PAGE 544 of 623

SANITARY SEWER SPILL MONITORING PLAN
1 DECEMBER 2024
1 Introduction
The Sanitary Sewer System Spill Water Quality Monitoring Plan (Monitoring Plan) provides technical information for water quality monitoring locations and techniques that may be used to characterize the relative impacts to the receiving water quality in the event of a sanitary sewer spill (spill) within the City of San Marino (City) service area.

In the event of a spill, it is assumed response actions identified in the City’s Spill Emergency Response Plan and Sewer System Management Plan (SSMP) will be implemented to protect public health and the environment. This plan covers details on monitoring receiving water quality separate from the emergency response and cleanup efforts.

Recent updates to the waste discharge requirements general order for sanitary sewer systems1 (WDR) require timely implementation of spill-specific notification, monitoring, and reporting tasks for spill events that exceed certain volume thresholds. In the event of a spill >50,000 gallons, the WDR outlines monitoring requirements generally aligned to estimate spill location and spread as well as receiving water conditions to support impact analysis documented in a spill report. This Monitoring Plan provides technical and procedural details to allow for rapid implementation of water quality monitoring activities that may be used to characterize the extent and magnitude of potential impacts related to a spill. These water quality activities are based on standard procedures implemented as part of municipal and industrial water quality monitoring programs.

Surface runoff in the geographical area served by City flows into both City of San Marino storm drains and Los Angeles County Flood Control District (LACFCD) storm drains. Receiving water quality monitoring has been conducted in these drains as part of various compliance, special study, and third-party efforts over the past two decades.

The City owns and operates the sanitary sewer collection system within its service area. The system is designed to transport sanitary sewage to trunk sewers operated by the Sanitary Districts of Los Angeles County for further transportation, treatment, and eventual discharge. The location of major collection system assets and components, watershed configuration, drainage characteristics, safety, and accessibility shall be used to select a distributed array of water quality monitoring locations that may be used during a spill response event. In the event of a spill, it is recommended that City staff evaluate the spill size, location, duration, volume, and ambient weather conditions to develop a focused water quality monitoring strategy and monitoring plan.

The overall purpose of this document is to provide the following information:
• A geographic overview of City assets
• Guidance on identifying representative water quality monitoring locations for spill response • A summary of water quality monitoring methods and protocols The following sections provide background information and sample collection methodology for identifying monitoring locations.
1 Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems. Order WQ 2022-0103-DWQ PAGE 545 of 623

SANITARY SEWER SPILL MONITORING PLAN
2 DECEMBER 2024
2 Background
Wastewater and stormwater2 discharges from the City are regulated through state issued permits that define management, monitoring, and reporting requirements. These WDRs are created based on evaluation of the City’s threat to water quality and quality of the receiving waters.

The City operates under the Coastal Watersheds of Los Angeles County Phase I municipal separate storm sewer system (MS4) permit (MS4 Permit) and is part of the Upper Los Angeles River Watershed Management Area Group.

Under the MS4 Permit, the City monitors storm drain outfalls during wet- and dry-weather to detect non-storm water discharges to its MS4 and monitoring water quality during storm events as part of the Coordinated Integrated Monitoring Program (CIMP). Non-stormwater discharges may come from many sources including, but not limited to, illicit connections, illicit discharges, and sewage spills. This document pertains to water quality as a result of a sewage spill, however, monitoring results from the regional CIMP are useful for comparison with spill event samples.

2.1 Spill Monitoring Plan Framework
The WDR Attachment E1 (Appendix A) includes spill notification, spill location and spread observations, monitoring, and reporting requirements. Implementation requirements for these elements are summarized below.

Notification
For any spill that discharges in or on any waters of the State, the discharger is to notify the California Office of Emergency Services as soon as possible but no later than two (2) hours after: a) knowledge of the spill; and b) notification can be provided without interfering with cleanup/emergency measures.

Location and Spread Observations
In the event of a spill, the discharger is to visually assess the spill locations and extent using photography, global positioning system (GPS) and other tools. Key documentation:
• The system location where spill originated
o For multiple appearance points of a single spill event, the points closest to the spill origin. • Drainage conveyance system spill entry locations
• Locations where spill discharges to receiving waters
• Extent of spread and locations of cleanup
2 National Pollutant Discharge Elimination System (NPDES) Waste Discharge Requirements (WDRs) for Municipal Separate Storm Sewer System (MS4) Discharges within the Coastal Watersheds of Los Angeles County, Except those Discharges originating from the City of Long Beach MS4 Order R4-2012-0175-A01 NPDES NO. CAS004001 PAGE 546 of 623

SANITARY SEWER SPILL MONITORING PLAN
3 DECEMBER 2024
Additionally, the discharger needs to estimate the spill volume using appropriate techniques, calculations, and documentation for electronic reporting.

Following spill volume estimation, the discharger is required to perform visual observations for spills that discharge to receiving waters. Key documentation includes:
• Estimated spill travel time to receiving water
o For spills entering a drainage conveyance system, this includes travel time from entry into the drainage conveyance system to receiving water discharge • Spill volume entering receiving water
• Photography:
o Waterbody bank erosion (if applicable)
o Floating matter
o Surface sheen (oil and grease)
o Discoloration of receiving waters
Monitoring
A spill estimated at 50,000 gallons or greater discharged to a receiving water requires the discharger to perform water quality monitoring. Monitoring must be conducted no later than 18-hours after the discharger’s knowledge of a potential discharge to a surface water.

Daily samples must be collected at the discharge point to the receiving water and at locations upstream and downstream of the discharge point. If the spill entered the receiving water from a drainage conveyance, a sample must be taken from within the conveyance as well, given spill material is still present. Upstream samples should be taken at a sufficient distance from the discharge point to capture ambient conditions absent of spill material.

Downstream sample point must be taken far enough from the discharge point where the spill material is fully mixed with the receiving water.

Once collected, the samples must be submitted to a certified laboratory in a timely manner for analysis of ammonia and fecal indicator bacteria.

PAGE 547 of 623

SANITARY SEWER SPILL MONITORING PLAN
4 DECEMBER 2024
Reporting
Electronic reporting to the California Integrated Water Quality System (CIWQS)3 is required for all spills. For spills greater than 50,000 gallons and discharged to receiving waters, a Spill Technical Report is required within 45 days of the spill end date. The Spill Technical Report must contain the following:
• Spill causes and circumstances
• Discharger’s response to spill
• Water quality monitoring information
• Evaluation of spill impacts, including short- and long-term impact(s) to beneficial uses of surface waters Spill report information is then used by Regional Water Quality Control Board staff to evaluate the relative impact to the environment and to form the basis of potential spill-specific enforcement actions.

2.2 Geographic Setting
The City drains to the south, with elevations ranging from approximately 558 feet above sea level at City Hall, increasing to the north toward the San Gabriel Mountains4. The major drainage areas within the City include Arroyo Seco, Rubio Wash, and Eaton Wash. Generally, these drainage areas flow north to south.

2.3 San Marino Assets
The City operates and maintains a sanitary collection system that provides service to approximately 12,000 residents5. The City operates and maintains approximately 50 miles of gravity pipelines and three (3) pump stations, which serves the majority of the City’s 3.8 square mile City limits, as shown in Figure 1. The City’s sanitary collection system conveys these untreated flows to the Los Angeles County Sanitation District’s (LACSD) trunk sewer system.

There are five (5) LACSD trunk sewers running through the City of San Marino. In general, these assets constitute infrastructure that have potential to contribute to spills that may require a monitoring program and shall be used in the sample location assessment outlined in Section 3.
3 https://ciwqs.waterboards.ca.gov/
4 City of San Marino Sewer System Management Plan Report, 2019 5 U.S. Census Bureau. 2020.

PAGE 548 of 623

SANITARY SEWER SPILL MONITORING PLAN
5 DECEMBER 2024
Figure 1. San Marino Major Sewer System Assets
PAGE 549 of 623

SANITARY SEWER SPILL MONITORING PLAN
6 DECEMBER 2024

2.4 Potential Monitoring Locations
Within the context of the City’s geography and sewer system assets, the City shall identify potential spill monitoring locations. The monitoring locations shall be selected to provide core representation of locations where critical sewer infrastructure has potential for a large spill event, adjacent stormwater conveyance and other infrastructure has potential to be impacted by a large spill event, and during/post-event monitoring at the selected locations may provide reasonable capacity to characterize impacts to water quality from a spill. A spill that impacts water quality is likely to be conveyed through the MS4 before reaching the receiving water, however, in limited situations a spill immediately adjacent to a receiving water may discharge directly to the water body. The WDR defines four distinct monitoring location types (Figure 2):
• Flow in MS4 or non-sewer infrastructure conveyance(s) prior to the discharge point • Receiving Surface Water (RSW) discharge point
• RSW upstream of the discharge point
• RSW downstream of the discharge point
A spill event will determine the exact monitoring location(s) needed to be sampled based on discharge point to the receiving water. However, the guidelines for identifying core monitoring locations and methods documented in this Monitoring Plan allow for rapid implementation of a monitoring program that will both meet the requirements of the WDR and provide critical information that may be used to inform the required Spill Technical Report impact analysis.

Accordingly, this Monitoring Plan only provides guidance on identifying potential upstream and downstream monitoring locations. Monitoring in the MS4 or non-sewer infrastructure conveyance(s) as well as RSW discharge point monitoring will require the City to evaluate on a spill-by-spill basis where to setup these locations.

Additional information detailing how to identify upstream and downstream monitoring locations for this Monitoring Plan is presented in Section 3.

PAGE 550 of 623

SANITARY SEWER SPILL MONITORING PLAN
7 DECEMBER 2024
Figure 2. Sewer Spill Water Quality Monitoring Location PAGE 551 of 623

SANITARY SEWER SPILL MONITORING PLAN
8 DECEMBER 2024

2.5 Water Quality Sample Constituents
Attachment E of the WDR lists two required constituents to monitor in surface water impacted by a sewer spill. All water quality samples are required to measure the concentration of ammonia and the concentration of the appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives. For San Marino, the Los Angeles Regional Board's Basin Plan6 identifies E-coli and Enterococcus as the fecal indicator bacteria for the region. Table 1 identifies the required constituents to sample for and information on the specific requirements for each sample method.

Table 1. Water Quality Sample Collection, Preservation, and Analysis Constituent
Analytical
Method
Minimum
Sample
Volume
Sample
Container
Preservation Method
Maximum
Holding Time
Ammonia EPA 350.1 250 mL Plastic Sulfuric Acid,
4°Celcius 28 days
E. Coli SM-9223-B 100 mL Plastic
Sodium thiosulfate,
4°Celcius 6 hours
Enterococcus Enterolert 100 mL Plastic Sodium thiosulfate, 4°Celcius 6 hours
6 Water Quality Control Plan Basin Plan for the Coastal Watersheds of Los Angeles and Ventura Counties Basin Plan for the Coastal Watersheds of Los Angeles and Ventura Counties | Los Angeles Regional Water Quality Control Board (ca.gov)
PAGE 552 of 623

SANITARY SEWER SPILL MONITORING PLAN
9 DECEMBER 2024
3 Monitoring Site Selection
The City shall conduct an analysis using the location of known City assets, watershed boundaries, and the City boundary. The analysis will result in a suite of potential monitoring locations that are prioritized based on the following characteristics:
• Proximity to City sewer assets
• Ability for a spill to flow to a receiving water
• Potential for monitoring site to serve as a reference point for the City As previously mentioned, the monitoring sites shall be chosen for their ability to characterize water quality conditions before and after being influenced by the City. Due to the transient nature of a spill, the drainage conveyance system and discharge point monitoring locations are spill specific and cannot be identified in preplanning.

Downstream monitoring locations are defined in the WDR as being “a point in the receiving water, downstream of the point of sewage discharge, where the spill is fully mixed with the receiving water.” Receiving waters in the City are defined by three separate watersheds: Arroyo Seco, Rubio Wash, & Eaton Wash. For each channel, the City shall identify all downstream points at the City boundary to use as monitoring locations for sample collection. These points represent where a spill that discharged into the channel upstream either from a storm drain outfall or surface runoff is fully mixed with the receiving water.

The WDR defines an upstream monitoring site as being “a point in the receiving water, upstream of the point of sewer discharge, to capture ambient conditions absent of sewage discharge impacts.” For the Monitoring Plan, upstream monitoring locations shall be selected for each of the major drainage areas upstream of City sewer assets and storm drain outfalls. Upstream monitoring locations shall also be selected based on proximity to major roads and ease of access to the receiving water.

In the event of a spill, it is recommended that City staff evaluate the spill location with respect to these guidelines and determine an appropriate upstream and downstream monitoring location. The drainage conveyance and discharge point monitoring location should be identified by visually inspecting the spill pattern on the ground surface and identifying if any material has flowed into the MS4 and/or directly discharged into a surface water.

PAGE 553 of 623

SANITARY SEWER SPILL MONITORING PLAN
10 DECEMBER 2024
4 Monitoring Procedures Overview
In general, monitoring locations shall be located in open stormwater channels and methodology derived from industry standard water quality sample collection procedures shall be used. Standard methods include documenting site conditions and sample characteristics (color, odor, turbidity, etc.), flow estimations, and other observations and activities that may be used to evaluate water quality or sample collection specifics.

Water quality monitoring requires the coordination of both field personnel and the selected analytical laboratory during monitoring events, as well as proper management of field and laboratory data. Monitoring event preparation includes allocating sample collection equipment, bottles, labels, and chain of custodies (CoCs). Activities to be performed during a monitoring event include the proper collection and handling of water samples and the submission of samples within laboratory holding times. In addition to the field effort involved with monitoring, such as travel, parking, sample collection and handling, additional effort is required after a monitoring event to ensure the proper management of field and analytical data.

Monitoring locations should be assessed for representative conditions prior to collecting a water sample. For example, collection of a sample should target flowing water in riverine locations and avoid stagnant pools. If a monitoring location does not offer such conditions, a sample may still be collected, but field notes shall include observations such as pooled water, presence of algae (and volume estimates), and other biological conditions. It is recommended that City staff review available sample collection and handling resources [e.g., Caltrans Monitoring Guidance Manual7 (Caltrans 2020), NPDES Stormwater Sampling Guidance Document8 (EPA 1992)] prior to a monitoring event, and/or consult a water quality professional, as necessary. A brief synopsis of the key monitoring and flow measurement protocol are provided below in Section 4.1 and 4.2.

4.1 Manual Sample Collection
Manual sample collection involves filling a container from a runoff stream or receiving waterbody. This can be done either by collecting the sample directly into laboratory-supplied bottles or by using an intermediate container to pour the sample into the lab bottles. Note that samples for certain constituents, including oil and grease, bacteria, and low-level mercury, are best if collected directly into the appropriate sample bottle without use of an intermediate container, however, in certain situations that might not be feasible and intermediate container is necessary.

An intermediate sample container can be an unused laboratory bottle, and sample collection can be assisted by a device that is extended to dip, lower, or reach the sample container into the waterbody. This method is ordinarily used when the waterbody is difficult to access, and an intermediate container must be lowered into the water or reached 7 https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/env/ctws-ot-20-350-04-01-monitoringguidance-manual-a11y.pdf 8 https://www3.epa.gov/npdes/pubs/owm0093.pdf
Manual sample collection methods
using an intermediate container
PAGE 554 of 623

SANITARY SEWER SPILL MONITORING PLAN
11 DECEMBER 2024
across some distance to collect a sample. Additionally, the use of an intermediate container when filling prepreserved laboratory bottles can be beneficial because it eliminates the risk of accidentally rinsing out the preservative while filling the bottles.

4.2 Flow Rate Estimation via Float Velocity Method
To use this method, first it is necessary to determine the cross-sectional area of the flow at a specific location. This requires estimation of flow depth and width, as well as a general assessment of the bottom channel shape such as rectangular or trapezoidal. Then field technicians mark two places on the bank of the channel at least five feet apart (using a longer distance between the two points will result in a more accurate flow measurement).

When this setup is complete, the flow can be measured by releasing a buoyant object into the channel upstream of the two marked points on the bank and measuring the time it takes to flow between them. The rate of flow can be calculated by the following formula:

Equation 1:

𝐹𝑙𝑜𝑤 𝑅𝑎𝑡𝑒 (
𝑓𝑡3
𝑠𝑒𝑐 ⁄ ) =
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝐵𝑒𝑡𝑤𝑒𝑒𝑛 𝑃𝑜𝑖𝑛𝑡𝑠 (𝑓𝑡)
𝑇𝑟𝑎𝑣𝑒𝑟𝑠𝑒 𝑇𝑖𝑚𝑒 (𝑠𝑒𝑐)
× 𝐶𝑟𝑜𝑠𝑠 𝑆𝑒𝑐𝑡𝑖𝑜𝑛𝑎𝑙 𝐴𝑟𝑒𝑎 (𝑓𝑡2)
There are some disadvantages to the float method: (1) measuring the cross-sectional area of a large water body can be difficult, and inaccuracies in this value will affect the accuracy of the flow measurement, and (2) the method measures velocity of flow only at the surface of a channel, which may not be representative of the velocity throughout the entire cross section of flow. Therefore, when using this method, multiple measurements should be taken at different points across the channel and the results averaged.

The accuracy of the float method is improved by using an object that has a density similar to water and that tends to float totally submerged. For example, oranges are good floating objects for this method because they are easy to see, remain buoyant, and are environmentally safe.

The float method should only be used if a mechanical flow meter is not available. Mechanical flow meters, such as a turbine flow meter or ultrasonic flow meter, will provide more accurate flow velocity at a given point. The crosssectional area will still need to be estimated to calculate a flow rate, however, flow meters help reduce the time, effort, and potential inaccuracy introduced by the manual float method.

4.3 Monitoring Equipment
The use of proper monitoring equipment is necessary to ensure the safety of personnel collecting the samples and integrity of the samples themselves. Contact with raw sewage can have acute and long-term impacts to human health that can be avoided using the proper personal protective equipment (PPE). Additionally, contamination of the sample may occur if inappropriate equipment or handling methods are used.

Recommended PPE for receiving water monitoring includes:
• Disposable latex gloves
PAGE 555 of 623

SANITARY SEWER SPILL MONITORING PLAN
12 DECEMBER 2024
• Close-toed shoes, long pants, and long sleeve shirt
• Optional Tyvek suit or similar if contact with the spill material is likely • Eye protection (glasses or goggles) and/or face shield • Disinfecting wipes and hand sanitizer
To be ready for a spill, it is recommended the following list of equipment is procured and stored in a centralized location. Store enough sampling bottles to be able to collect up to four days of samples at each of the four monitoring location types described in Section 2.4. In the event that any of the bottles are lost or compromised, it is recommended to also have a full set of backup bottles. • Four days’ worth of sample bottles plus one days’ worth of back-up includes:
o 40 x 100 mL plastic bottles with Sodium thiosulfate preservative o 20 x 250 mL plastic bottles with Sulfuric acid preservative • Sample bottle labels and water-resistant marker
• CoC sheets (Appendix B)
• Visual observation log (Appendix C)
• Cooler for ice to keep samples at or below 4°C
• Grab pole to safely reach into drains as needed
For additional resources, the Caltrans and/or EPA guidance documents referenced at the beginning of this section can serve as a general guide for collecting water quality samples. While these documents focus on stormwater sampling, the safety protocols and handling methods apply to the receiving water monitoring discussed in this plan.

4.4 Water Quality Laboratory
Monitoring samples must be taken to an Environmental Laboratory Accreditation Program (ELAP) certified laboratory for analysis. The closest public ELAP certified laboratory is in Pasadena:
• City of Los Angeles Dept. of Water & Power, Water Quality Laboratory. Located at 555 East Walnut Street, Pasadena.

In the event that the local laboratories are unavailable during a spill event, consult the State Water Resources Control Board ELAP webpage9 for a mapping tool that shows the closest laboratories and their contact information. 9 https://www.waterboards.ca.gov/drinking_water/certlic/labs/ PAGE 556 of 623

SANITARY SEWER SPILL MONITORING PLAN
13 DECEMBER 2024
5 Site Access and Safety Considerations
Access to monitoring locations must be assessed for safety considerations during each visit. Field staff should use caution at all times in evaluating roadway safety and right of way conditions. Specific safety concerns relating to surface water sampling includes potential slip, trip, and fall hazards, biological hazards, and swift water. To reduce safety risks, grab poles should be considered for sample collection at difficult to reach monitoring locations.

Unlike receiving water monitoring locations, drainage conveyance monitoring locations are often located in the street and require some level of traffic control based on the type of road and time of day. Compounding this issue is that spills frequently occur during rain events which make for even more dangerous road conditions. Monitoring locations presented in this plan are intended to represent the most optimal location from a data standpoint, but not necessarily from a personnel safety standpoint. At all times, personnel safety should be the top priority, and monitoring should be delayed or relocated if safety is potentially compromised.

Site-specific access and safety considerations are presented in the following section. 6 Summary
This Monitoring Plan provides the City with technical guidance for monitoring receiving water quality in the event of a sewer spill. Water quality monitoring can help the City determine the relative impact of a spill and help guide management decisions relating to remediation and spill response. These monitoring protocols and site-specific descriptions provide City staff with a detailed guidance document for performing water quality monitoring and assessing impact to waterbodies following a sewer spill.

Guidance on selecting monitoring locations for this Monitoring Plan was provided, focusing on identifying sites based on their proximity to City assets, drainage characteristics, safety, accessibility, and the ability to isolate runoff from a spill that is only influenced by the City. Drainage conveyance and point of discharge monitoring locations will be determined in real time if a spill reaches the receiving water. All monitoring sites chosen by the City are subject to change should a different site be identified as preferable for properly characterizing impacts to water quality from a spill event. It is recommended that the City periodically visit their selected monitoring locations to ensure they remain accessible and safe.

PAGE 557 of 623

SANITARY SEWER SPILL MONITORING PLAN
14 DECEMBER 2024
7 References
Caltrans 2020. Stormwater Monitoring Guidance Manual. https://dot.ca.gov/-/media/dotmedia/programs/environmental-analysis/documents/env/ctws-ot-20-350-04-01-monitoring-guidancemanual-a11y.pdf Environmental Protection Agency 1992. NPDES Storm Water Sampling Guidance Document. https://www3.epa.gov/npdes/pubs/owm0093.pdf
State Water Resources Control Board 2022. Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems. Order WQ 2022-0103-DWQ.
https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022- 0103-dwq.pdf
PAGE 558 of 623

SANITARY SEWER SPILL MONITORING PLAN
DECEMBER 2024
Appendix A
Waste Discharge Requirements (WQ 2003-0005-DWQ)
Attachment E.1
PAGE 559 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information........................................................................... E1-4

1.3. Notification of Spill Report Updates................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................E1-5

2.4. Safety and Access Exceptions ........................................................................E1-8

3. Reporting Requirements ............................................................................................E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting .................E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ...............E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills..................................E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills..................................E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills ..................................E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills .............E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map...................E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)..................................................................E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................E1-19

3.11. Sewer System Management Plan Reporting Requirements .........................E1-19

4. Recordkeeping Requirements .................................................................................E1-20

4.1. Recordkeeping Time Period..........................................................................E1-20

4.2. Availability of Documents ..............................................................................E1-20

4.3. Spill Reports..................................................................................................E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills .......E1-21

4.5. Sewer System Telemetry Records................................................................E1-22

4.6. Sewer System Management Plan Implementation Records .........................E1-22

4.7. Audit Records................................................................................................E1-23 PAGE 560 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records.......................................................................................E1-23

4.9. Work Orders..................................................................................................E1-23 PAGE 561 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board (State Water Board) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.

PAGE 562 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.

PAGE 563 of 623
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.