AGENDA – SEPTEMBER 26, 2025 PAGE 1 of 623
CITY OF SAN MARINO
CITY COUNCIL AGENDA
Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
Philippe Eskandar, City Manager
www.SanMarinoCA.gov
(626) 300-0700 Phone
City Hall Council Chamber
2200 Huntington Drive
San Marino, CA 91108
ADJOURNED REGULAR MEETING OF THE
SAN MARINO CITY COUNCIL
FRIDAY, SEPTEMBER 26, 2025 AT 8:30 AM
CITY HALL COUNCIL CHAMBERS
2200 HUNTINGTON DRIVE
SAN MARINO, CA 91108
The City of San Marino appreciates your attendance. Citizens’ interest provides the Council with valuable information regarding issues of the community.
Regular meetings are held on the 2nd Wednesday of every month at 6:00 p.m. Typically, adjourned meetings are held on the last Friday of every month at 8:30 a.m.
In compliance with the Americans with Disabilities Act, any person with a disability who requires a reasonable modification or accommodation in order to participate in a meeting should contact the City Clerk via email at [email protected] or by phone at (626) 300-0705 at least 48 hours prior to the meeting for assistance.
The public is welcome to attend the meeting in person or remotely via Zoom, however, the meeting will proceed as normal even if there are technical difficulties with Zoom. The City will do it’s best to resolve any technical issues as quickly as possible.
How to view or listen to the meeting from home:
Visit www.SanMarinoCA.gov/Zoom
How to offer public comment from home:
Public comment will be accepted by email to [email protected] until 3:00 p.m. the day before the meeting. Written public comment received by 3:00 p.m. will be distributed to City Council during the meeting. Any comments received after 3:00 AGENDA – SEPTEMBER 26, 2025 PAGE 2 of 623
p.m. will be included in the public comment record but not provided to City Council at the meeting.
Written public comment will be accepted electronically via the zoom.us teleconference module during the meeting. Written Zoom comments will be accepted after the in-person comments.
Written Zoom comments will be read or summarized, then printed and made part of the public record for the meeting.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
Council Member Chang, Council Member Chou, Council Member Lo, Vice Mayor Chou, and Mayor Shepherd Romey
POSTING OF AGENDA
The agenda is posted 72 hours prior to each meeting at the following locations: City Hall, 2200 Huntington Drive, the Crowell Public Library, 1890 Huntington Drive, and the Stoneman Building, 1560 Pasqualito Drive. The agenda is also posted on the City’s website:
http://www.SanMarinoCA.gov.
PUBLIC COMMENTS
The City welcomes public input. Members of the public may address the City Council by completing a public comment card and giving it to the City Clerk prior to the meeting. At this time, the public may address the City Council on items that are not on the agenda.
Pursuant to state law, the City Council may not discuss or take action on issues not on the meeting agenda (Government Code Section 54954.2). The Mayor reserves the right to place limits on duration of comments. Staff may be asked to follow up on such items.
CEREMONIAL
PROCLAMATION OF OCTOBER 10, 2025, AS THE NATIONAL DAY OF THE
REPUBLIC OF CHINA (TAIWAN)
NEW BUSINESS
1. CONSIDERATION OF IMPLEMENTING A NAME FOR THE UNNAMED
SECTION OF ALLEY NORTH OF HUNTINGTON DRIVE AND EAST OF
WINSTON AVENUE
AGENDA – SEPTEMBER 26, 2025 PAGE 3 of 623
Recommendation: Staff recommends the Council provide direction on the requested roadway naming request. Should the City Council wish to rename the roadway as discussed above, an appropriate motion would be:
”I move to approve the naming of the currently unnamed section of alley north of Huntington Drive and east of Winston Avenue to the edge of San Marino High School as “Lehman Lane” after community member Mitch Lehman.”
2. CONSIDERATION OF APPEAL FOR VARIANCE NO. VAR 24-01 AND CONDITIONAL USE PERMIT NO. CUP 24-02 AT 2571 MISSION STREET
FOR ON-SITE SALE AND CONSUMPTION OF ALCOHOLIC BEVERAGES
FOR AN EXISTING DELI/SMALL RESTAURANT (PROVISIONS)
.…………..
Recommendation: Pursuant to SMMC Section 23.07.09, upon receiving a notice of appeal the Council shall either:
Affirm the action of the Commission; or
Require a summary of all evidence upon which the Planning Commission made its decision; after receiving such evidence, the Council shall take such action as, in its opinion, is indicated by such evidence alone; or
Refer the matter back to the Planning Commission, with or without instructions, for further proceedings; or
Instruct the City Clerk to set the matter for hearing within seventy-five (75) days before itself, unless the applicant and all appellants consent to a later date. At such hearing, it shall hear and decide the case de novo. Such hearing shall be conducted in the manner and with the notice prescribed by the SMMC for the Planning Commission.
PUBLIC HEARINGS
3. PUBLIC HEARING TO CONSIDER ADOPTION OF ORDINANCE NO. O-25- 1421 (SECOND READING) AND URGENCY ORDINANCE NO. O-25-1423- U, ADOPTING THE 2025 EDITIONS OF THE CALIFORNIA BUILDING STANDARDS CODES AND ADOPTION OF RESOLUTION NO. R-25-23
Recommendation: Staff recommends the Council conduct the public hearing, adopt Ordinance No. O-25-1421, Urgency Ordinance No. O-25-1423-U and adopt Resolution No. R-25-23. If the City Council concurs with staff’s recommendation, the appropriate motion would be: …………………………………………………………………………………………
“I move to waive full reading and adopt Ordinance No. O-25-1421, an Ordinance of the City of San Marino Adopting by Reference the 2025 Editions of the California Administrative, Building, Mechanical, Plumbing, Electrical, Residential, Fire, Energy, Green Building Standards, Historical Building, Existing Building, Appendix J Los Angeles County Grading Standards and Referenced Standards Codes, with Certain Amendments, Deletions and Additions, and Amending Chapter 25 of the San Marino AGENDA – SEPTEMBER 26, 2025 PAGE 4 of 623
Municipal Code, and Urgency Ordinance No. O-25-1423-U, an urgency version of Ordinance No. O-25-1421, and to adopt Resolution No. R-25-23.”
CONSENT CALENDAR
4. AWARD OF A CONSTRUCTION AGREEMENT TO G2 CONSTRUCTION, INC. FOR THE PURCHASE AND INSTALLATION OF CATCH BASIN TRASH AND DEBRIS CAPTURE DEVICES IN THE AMOUNT OF $150,000
Recommendation: Staff recommends the City Council approve the procurement and installation of trash and debris capture devices from G2 Construction, Inc. in the amount of $150,000. If the City Council concurs with staff’s recommendation, an appropriate motion would be: .….
“I move to approve the Construction Agreement for the procurement and installation of trash and debris capture devices from G2 Construction, Inc. in the amount of $150,000.”
5. ADOPTION OF ORDINANCE NO. O-25-1422 (SECOND READING) AN
ORDINANCE OF THE SAN MARINO CITY COUNCIL AMENDING SECTION
2.05.01 OF THE MUNICIPAL CODE TO RESTATE INDIVIDUALS EXEMPT FROM THE CITY’S CLASSIFIED SERVICE
Recommendation: Staff recommends the Council adopt Ordinance No. O-25-1422, an Ordinance of the San Marino City Council amending Section 2.05.01 of the Municipal Code to clarify which offices, positions, and employments are exempt from the City’s Classified Service. If the City Council concurs with staff’s recommendation an appropriate motion would be: .
“I move to approve Ordinance No. O-25-1422, an Ordinance of the San Marino City Council amending Section 2.05.01 of the Municipal Code to restate individuals exempt from the City’s Classified Service.”
6. APPROVE RESOLUTION R-25-30 ADOPTING THE UPDATED SEWER
SYSTEM MANAGEMENT PLAN (SSMP) IN COMPLIANCE WITH STATE
WATER RESOURCES CONTROL BOARD ORDER NO. 2022-0103-DWQ
AND AUTHORIZING THE LEGALLY RESPONSIBLE OFFICIAL TO CERTIFY
AND SUBMIT THE SSMP TO THE CALIFORNIA STATE WATER
RESOURCES CONTROL BOARD
Recommendation: Staff recommends the City Council approve Resolution R-25-30 adopting the 2025 Sewer System Management Plan (SSMP) Update and authorizing the Legally Responsible Official to certify and submit the SSMP to the State Water Resources Control Board. If Council concurs with staff’s recommendation, an appropriate motion would be: .
“I move to approve Resolution R-25-30 adopting the updated Sewer System AGENDA – SEPTEMBER 26, 2025 PAGE 5 of 623
Management Plan (SSMP) in compliance with State Water Resources Control Board Order No. 2022-0103-DWQ and authorizing the Legally Responsible Official to certify and submit the SSMP to the California State Water Resources Control Board.”
7. ADOPTION OF RESOLUTION R-25-28 ESTABLISHING AN ELECTRONIC
SIGNATURE POLICY
Recommendation: Staff recommends the Council adopt a Resolution establishing an Electronic Signature Policy for select City documents to provide City Staff and external partners with an alternative method to secure legally binding signatures and authorizations. If the City Council concurs with staff’s recommendation, an appropriate motion would be:
”I move to adopt Resolution No. R-25-28 establishing an Electronic Signature Policy.”
8. CASH AND INVESTMENT REPORT FOR THE MONTH OF AUGUST 2025 Recommendation: Staff recommends the Council receive and file this report. If the City Council concurs with staff’s recommendation, an appropriate motion would be:
“I move to receive and file the Cash and Investment Report for the Month of August 2025.”
WRITTEN COMMUNICATIONS OR PUBLIC WRITINGS DISTRIBUTION
This is an opportunity to announce any written communications pertaining to the City received by members of the City Council. All public writings distributed by the City of San Marino to at least a majority of the City Council regarding any item on this agenda will be made available at the Public Counter at City Hall located at 2200 Huntington Drive, San Marino, California 91108, and will also be included in the public agenda packet that will available for review at the City Council meeting.
FUTURE AGENDA ITEMS
CLOSED SESSION
The City Council will recess to closed session to discuss:
9. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
GOVERNMENT CODE 54957 (B)
Title: City Manager
10. CONFERENCE WITH LABOR NEGOTIATORS
GOVERNMENT CODE 54957.6
AGENDA – SEPTEMBER 26, 2025 PAGE 6 of 623
City of San Marino Representative: Joe Montes, City Attorney Unrepresented Employee: City Manager
RECONVENE TO OPEN SESSION
ADJOURNMENT
Posted: 09/19/2025 ALISON WALKER
CITY CLERK
CLOSED SESSION REPORT
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Nicole Tibbet, Community Engagement Manager
DATE: September 26, 2025
SUBJECT: CONSIDERATION OF IMPLEMENTING A NAME FOR THE
UNNAMED SECTION OF ALLEY NORTH OF HUNTINGTON
DRIVE AND EAST OF WINSTON AVENUE
STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Inviting and Relevant City Facilities
Well-Maintained Infrastructure
BACKGROUND
At the October 9, 2024, City Council Meeting, then-Council Member Steve Talt requested a future agenda item be placed on a City Council agenda considering naming the section alley north of Huntington Drive and east of Winston Avenue to the edge of San Marino High School as “Lehman Lane” after community member Mitch Lehman. After Council concurrence that they would consider the item on a future agenda, staff conducted research on how this could be brought forward.
Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 7 of 623
Below is a map of the alley section under consideration:
The City’s Municipal Code and policies do not have an outlined process for naming or renaming streets in the City. As San Marino has been a fully builtout community for some time, the need to consider naming a new street has not arisen in recent history.
DISCUSSION
Former Council Member Steve Talt recommended naming this stretch of alley after Mitch Lehman for his many contributions to the San Marino community.
Mr. Lehman served as the Sports Editor for the San Marino Tribune for 29 years and the editor for 25 years. Throughout his career he wrote articles that garnered more than 20 awards from the California Newspaper Publishers Association for his exceptional coverage of sports, education and civics in San Marino. Mr. Lehman has received two (2) independent Pulitzer Prize nominations. He was awarded the Golden Quill Award from the California School Board Association for his contributions to and coverage of the San Marino Unified School District. Mr. Lehman is one (1) of only a handful in the community to receive the “Very Special Person Award” from the San Marino PTA at the annual Founders Day ceremony and was named an Honorary Paul Harris Fellow by the Rotary Club of San Marino.
PAGE 8 of 623
For over 25 years, Mr. Lehman also served as the announcer for San Marino High School (SMHS) football games, including decades as the TV announcer.
He could also be seen behind the mic at baseball, basketball, softball, and volleyball games. Mr. Lehman has also served as the Master of the Ceremonies for several events in town, including Candidate Forums, Boy and Girl Scout events, Non-Profit events, PTSA events, and school events. He also served as the “Host” for SMHS Grad Night for several years, dressing in character. Mr.
Lehman was also instrumental in starting the Memorial Day event at the War Memorial at Lacy Park.
While it is not common practice for a city to name a street after a living person, the City does not anticipate a similar occasion arising in the future.
Additionally, given that this particular alley does not have any legal addresses associated with it and is currently unnamed, the naming would not have any impact on adjacent properties.
If named “Lehman Lane,” the City would install and maintain a street sign that would mark that stretch of alley.
FISCAL IMPACT & PROCUREMENT REVIEW
The fiscal impact of naming the section alley north of Huntington Drive and east of Winston Avenue to the edge of San Marino High School as “Lehman Lane” is anticipated to be as follows:
Type of Cost Quantity Unit Cost Total
Street Name Sign 1 $87.75 $87.75
Sign Post 1 $77.38 $77.38
Concrete Base 2 $150.00 $300.00
Maintenance Worker I Labor 8 $27.98 $223.84
Maintenance Worker III Labor 8 $38.40 $307.20
Total $ 996.17
LEGAL REVIEW
The City Attorney's office has reviewed and approved as to form.
PAGE 9 of 623
RECOMMENDATION
Staff recommends the Council provide direction on the requested roadway naming request. Should the City Council wish to rename the roadway as discussed above, an appropriate motion would be:
”I move to approve the naming of the currently unnamed section of alley north of Huntington Drive and east of Winston Avenue to the edge of San Marino High School as “Lehman Lane” after community member Mitch Lehman.”
ATTACHMENTS
None.
PAGE 10 of 623
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Isidro Figueroa, Community Development Director
DATE: September 26, 2025
SUBJECT: CONSIDERATION OF APPEAL FOR VARIANCE NO. VAR 24- 01 AND CONDITIONAL USE PERMIT NO. CUP 24-02 AT
2571 MISSION STREET FOR ON-SITE SALE AND
CONSUMPTION OF ALCOHOLIC BEVERAGES FOR AN
EXISTING DELI/SMALL RESTAURANT (PROVISIONS)
STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Attractive, Complementary Business District;
Engaged and Connected Residents;
Efficient, Responsive, and Effective City Services;
Beautiful, Preserved, Single-Family Neighborhoods
BACKGROUND
The applicant requests to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 820 square-foot deli/small restaurant in the C-1 zone located at 2571 Mission Street. The application requires the following actions:
• Variance Case No. VAR 24-01: Pursuant to San Marino Municipal Code (SMMC) Section 23.03.01(C)(13)(d), businesses that are issued permits for the sale and consumption of alcoholic beverages shall be located at least five hundred feet (500') apart from each other. • Conditional Use Permit Case No. CUP 24-02: Pursuant to San Marino Municipal Code (SMMC) 23.03.01(C)(13), on-site sales and consumption of alcoholic beverages (beer and wine).
Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 11 of 623
The project was reviewed by the Planning Commission (“Commission”) during a public hearing on May 27, 2025. After reviewing the facts, staff report and receiving public comment which did not include any concerns from any member of the public, the Commission adopted Planning Commission Resolution No. PCR 25-11. On June 10, 2025, Shirley M. Jagels filed an appeal for VAR 24-01 and CUP 24-02.
DISCUSSION
Pursuant to San Marino Municipal Code (SMMC) Section 23.07.09 – Appeals, upon receiving a notice of appeal (or itself appealing a decision of the Commission), the City Council shall either:
a. Affirm the action of the Commission; or
b. Require a summary of all evidence upon which the Planning Commission made its decision; after receiving such evidence, the Council shall take such action as, in its opinion, is indicated by such evidence alone; or
c. Refer the matter back to the Planning Commission, with or without instructions, for further proceedings; or
d. Instruct the City Clerk to set the matter for hearing within seventyfive (75) days before itself, unless the applicant and all appellants consent to a later date. At such hearing, it shall hear and decide the case de novo. Such hearing shall be conducted in the manner and with the notice prescribed by the SMMC for the Planning Commission.
APPEAL
On May 27, 2025, the Planning Commission approved a variance to allow an existing deli/small restaurant to deviate from the City’s distance requirement and be allowed to serve beer and wine with meals within 500 feet of another establishment offering the same service and a conditional use permit for a Type-41 alcohol license to serve beer and wine in conjunction with meals, during a public hearing.
The Commission staff report provided an analysis of the project based on the information available to staff.
PAGE 12 of 623
The appellant, Shirley M. Jagels, filed the appeal for both VAR 24-01 and CUP 24-02 on June 10, 2025. The submitted appeal application listed a number of contentions, which are summarized below:
1. The notice of public hearing did not clarify the name of the existing 820 square-foot deli/small restaurant.
Staff Response: The notice of public hearing included the content required by Government Code Section 65094 (Title 7- Planning and Land Use Division 1- Planning and Zoning Chapter 2.7) which states:
“As used in this title, “notice of a public hearing” means a notice that includes the date, time, and place of a public hearing, the identity of the hearing body or officer, a general explanation of the matter to be considered, and a general description, in text or by diagram, of the location of the real property, if any, that is the subject of the hearing.” Attachment 7 contains the proof of publication of the notice of public hearing in the San Marino Tribune that was published on May 15, 2025, (12 days prior to the public hearing) and Attachment 8 contains the notice of public hearing that was sent to the required properties located within 300 feet of the project site which contain all of the contents required by Government Code Section 65094:
1. Date: May 27, 2025
2. Time: 6:00 p.m.
3. Place of Public Hearing: City Council Chambers 2200 Huntington Drive, San Marino, CA
4. Identity of the Hearing Body or Officer: Planning Commission
5. General Explanation of the Matter to be Considered: Full explanation of both the project and land use entitlements provided
6. Location of Real Property: 2571 Mission Street
Neither State law nor the SMMC require the name of the restaurant to be included in the notice of public hearing.
2. The appellant states that she is not aware that Provisions is actually a restaurant and has not received any mailings about this business as the property owner located across the street.
Staff Response: Provisions received a business license to operate as a deli/small restaurant in January 2023. SMMC does not require notification of the approval or establishment of any new businesses to surrounding properties or business owners.
PAGE 13 of 623
In accordance to SMMC Section 23.03.01(A), small restaurants are an allowed use in the C-1 Zone. An allowed use is approved at an administrative level and does not require a public hearing or notification to surrounding properties.
3. The appellant (San Marino resident) is concerned over the number of liquor licenses issued in town.
Staff Response: There are currently ten (10) Alcohol Beverage Control (ABC) licenses issued to establishments within the City. Seven (7) of the ABC licenses are Type-41, such as the one approved by the Commission for this project which authorizes the sale of beer and wine to restaurants.
The following list identifies the 7 restaurants within the City that have been issued a Type-41 ABC license categorized by commercial district:
Huntington Drive
• Colonial Kitchen
• Masamitsu
• Meat & Essentials
• Dumpling Bar
Mission Street
• Cielo
• San Marino Café
• Julienne
Huntington Library
The Huntington Library has three (3) ABC issued licenses which consist of the following:
Type-47: The Huntington Library is authorized to sale beer, wine and distilled spirits on the premises which includes the Rose Garden Tea Room and Café 1919 which are restaurants that serve visitors until 5:00 p.m. during the days when the Huntington Library is open to the public. The Huntington Library is also authorized to serve and sale beer, wine and distilled spirits during events held at the premises.
Type-58: This permit allows the Huntington Library’s catering service to cater alcoholic beverages off-site. This license type is subject to Responsible Beverage Service (RBS) requirements and requires alcohol servers and managers of alcohol servers to be RBS certified.
PAGE 14 of 623
Type-68: Since the Huntington Library has been issued a Type-47, this license allows the Huntington Library to sale and service beer, wine, and distilled spirits from portable bars within the Huntington Library campus. Each portable bar must be licensed and may be moved to different rooms or areas of the licensed premises. This license type is subject to RBS requirements and requires alcohol servers and managers of alcohol servers to be RBS certified.
The Commission has recently approved two conditional use permits that have not yet received ABC approval.
CUP 22-05: On July 26, 2023, the Commission approved a conditional use permit for a Type-41 license to serve beer and wine in conjunction with the establishment of a restaurant- El Dorado Pollos a la Brasa located at 2277 Huntington Drive. The applicant is currently working on submitting tenant improvement plans to the City’s Building and Safety Division for the issuance of a building permit and completing the ABC permitting process to receive a Type-41 license.
CUP 25-02: On May 27, 2025, the Commission approved a variance to allow Provisions, an existing deli/small restaurant to deviate from the City’s distance requirement and be allowed to serve beer and wine with meals within 500 feet of another establishment offering the same service and a conditional use permit for a Type-41 alcohol license to serve beer and wine in conjunction with meals. At the public hearing, the Commission did not receive any public comment identifying any concerns on the proposal. On June 10, 2025, Shirley M. Jagels filed an appeal for VAR 24-01 and CUP 24-02.
The proposed conditional use will allow the applicant to serve beer and wine in conjunction with meals. The conditional use will not have a detrimental effect upon the nature, condition, and development of nearby uses, as the proposed beer and wine service offered in conjunction with the restaurant’s meal service will not alter the operational characteristics and hours for the surrounding uses. The San Marino Police Department (SMPD) reviewed the proposed conditional use and did not identify that the alcohol license would be detrimental in nature to nearby uses or buildings. Additionally, SMPD did not object to the conditional use since it has not responded to any incident involving the sale and consumption of alcohol to any of the existing establishments serving and selling alcohol within the City.
Prior to the appeal, the applicant was in coordination with ABC to submit the Type-41 license application for the restaurant. A Type-41 alcohol license authorizes the sale and consumption of beer and wine on or off the premises where sold. Type-41 alcohol licenses also have the following provisional conditions:
PAGE 15 of 623
• Distilled spirits may not be on the premises (except brandy, rum, or liqueurs for use solely for cooking purposes).
• Must operate and maintain the licensed premises as a bona fide eating place.
• Must maintain suitable kitchen facilities and must make actual and substantial sales of meals for consumption on the premises. • Minors are allowed on the premises.
Staff included ABC’s provisional conditions referenced above in the City’s Standard Conditions of Approval for Provision’s CUP application.
The conditions for on-site retailers of beer and wine as required by SMMC Section 23.03.01 are outlined below. The purpose of these restrictions is to ensure that the sale and consumption of alcoholic beverages is ancillary to the use of the premises as a restaurant for the consumption of complete meals and to ensure that the premises does not develop into a lounge, or other facility where the sale and consumption of alcoholic beverages is the primary use.
a) Establishments that are limited to the onsite sale and consumption of beer and wine are permissible on any C-1 zoned property and are subject to the conditions described in this use.
b) The C-1 commercial zone on Mission Street shall be limited to the onsite sale and consumption of beer and wine, subject to the conditions described in this use.
c) There shall be no lounge area upon the licensed premises. d) The sale and consumption of alcoholic beverages shall be an ancillary use to a restaurant that serves complete meals.
e) Pool tables and other types of amusement devices are prohibited from the restaurant and/or bar.
f) Dance floors are also prohibited.
g) There shall be no exterior advertising of any kind or type including advertising directed to the exterior from within, promoting or indicating the availability of alcoholic beverages. Interior displays of beer and wine which are clearly visible to the exterior shall not be permitted. h) The quarterly gross sales of alcoholic beverages shall not exceed thirty percent (30%) of all gross sales of all food products sold for consumption on the premises during the same period. The licensee shall at all times maintain records which reflect separately the gross sales of alcoholic beverages and the gross sales of all other items at the licensed business. Said records shall be totaled no less frequently than on a quarterly basis and shall be made available to the city of San Marino on demand.
PAGE 16 of 623
i) The premises shall possess the necessary utensils, table service, and condiment dispensers with which to serve complete meals to the public. j) There shall be no serving and/or sales of alcoholic beverages prior to eleven o'clock (11:00) A.M. or later than twelve o'clock (12:00) midnight on Fridays and Saturdays; all other days, there shall be no serving and/or sales of alcoholic beverages prior to eleven o'clock (11:00) A.M. or later than ten o'clock (10:00) P.M. The serving and/or sales of beer and wine on Mission Street shall be prohibited prior to eleven o'clock (11:00) A.M. or later than ten o'clock (10:00) P.M. k) The purpose of these restrictions is to ensure that the sale and consumption of alcoholic beverages is ancillary to the use of the premises as a restaurant for the consumption of complete meals and to ensure that the premises does not develop into a lounge, or other facility where the sale and consumption of alcoholic beverages is the primary use.
ABC requires Type-41 alcohol business licensees to operate and maintain the licensed premises as a bona fide eating place, maintain suitable kitchen facilities, and make actual and substantial sales of meals for consumption on the premises. The applicant’s business operations statement confirms that alcoholic drinks will be served only with dine-in services. Examples of the complete meals proposed to be provided by the restaurant are Panko Crusted Chicken with Farro and Fresh Herbs, Grass-Fed Beef Burger with Farm-Fresh Greens and Tomato Confit, and Daily Pasta.
4. The appellant states that as a “special meeting” it was not clear that the public was sufficiently aware of the hearing and the appellant believes further review is warranted.
Staff Response: The notice of the special public hearing included the content required by Government Code Section 65094 (Title 7- Planning and Land Use Division 1- Planning and Zoning Chapter 2.7) which states:
“As used in this title, “notice of a public hearing” means a notice that includes the date, time, and place of a public hearing, the identity of the hearing body or officer, a general explanation of the matter to be considered, and a general description, in text or by diagram, of the location of the real property, if any, that is the subject of the hearing.” Attachment 7 contains the proof of publication of the notice of public hearing in the San Marino Tribune that was published on May 15, 2025, (12 days prior to the public hearing) and Attachment 8 contains the notice of public hearing that was sent to the required properties located within 300 feet of the project site which contain all of the contents required by Government Code Section 65094:
PAGE 17 of 623
1. Date: May 27, 2025
2. Time: 6:00 p.m.
3. Place of Public Hearing: City Council Chambers 2200 Huntington Drive, San Marino, CA
4. Identity of the Hearing Body or Officer: Planning Commission
5. General Explanation of the Matter to be Considered: Full explanation of both the project and land use entitlements provided
6. Location of Real Property: 2571 Mission Street
In addition to the aforementioned, the notice of public hearing was posted at City Hall, Stoneman and the Crowell Public Library. Furthermore, an announcement of the May 27th Special Planning Commission was included in the May 22nd City of San Marino Weekly Briefing.
As a point of reference, the Design Review Committee (DRC) holds regular meetings at the Barth Room within the Crowell Public Library. Since October 2, 2024, special DRC meetings have been held at the Council Chambers at City Hall instead of the Barth Room in order to accommodate easier access to participants and staff, as well as facilitate better audio/video capabilities. To this date, staff has not received any comments or communications from any member of the public indicating that insufficient notice has been provided of the special meeting.
HISTORIC PRESERVATION
The subject property is not identified on the Citywide Historic Resources Survey Report as a potential historic resource.
ENVIRONMENTAL FINDING
The project proposes to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 820 square-foot deli/small restaurant within 500 feet of another alcohol license. Pursuant to Section 21084 of the California Public Resource Code, the proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines, Article 19, Section 15301, Class 1 (Existing Facilities), and there is no substantial evidence demonstrating that an exception to a categorical exemption pursuant to CEQA Guidelines, Section 15300.2 applies.
FISCAL IMPACT & PROCUREMENT REVIEW
No measurable fiscal impact is associated with this item other than the staff time necessary to facilitate the preparation of this report and the appeal consideration by the Council.
PAGE 18 of 623
LEGAL REVIEW
The City Attorney’s office has reviewed and approved as to form.
RECOMMENDATION
Pursuant to SMMC Section 23.07.09, upon receiving a notice of appeal the Council shall either:
1. Affirm the action of the Commission; or
2. Require a summary of all evidence upon which the Planning Commission made its decision; after receiving such evidence, the Council shall take such action as, in its opinion, is indicated by such evidence alone; or
3. Refer the matter back to the Planning Commission, with or without instructions, for further proceedings; or
4. Instruct the City Clerk to set the matter for hearing within seventy-five (75) days before itself, unless the applicant and all appellants consent to a later date. At such hearing, it shall hear and decide the case de novo. Such hearing shall be conducted in the manner and with the notice prescribed by the SMMC for the Planning Commission.
ATTACHMENTS
1. Original Staff Report to Planning Commission dated May 27, 2025
2. Site Plan and Floor Plan
3. Provisions Business Operations Statement and Restaurant Menu
4. Radius Map (300’ for Legal Noticing)
5. Planning Commission Resolution No. PCR 25-11
6. Appeal Application with Attachments submitted on June 10, 2025
7. San Marino Tribune Proof of Publication dated May 15, 2025
8. Public Hearing Notice
PAGE 19 of 623
TO: Chair and Members of the Planning Commission
FROM: Isidro Figueroa, Community Development Director
BY: Camillia Martinez, Associate Planner
DATE: May 27, 2025
SUBJECT: CONSIDERATION OF APPROVAL FOR VARIANCE NO. VAR 24-01 AND CONDITIONAL USE PERMIT NO. CUP 24-02
AT 2571 MISSION STREET FOR ON-SITE SALE AND
CONSUMPTION OF ALCOHOLIC BEVERAGES FOR AN
EXISTING DELI/SMALL RESTAURANT (PROVISIONS)
STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Attractive, Complementary Business District
Efficient, Responsive, and Effective City Services
Engaged and Connected Residents
BACKGROUND
The applicant requests to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 820 square-foot deli/small restaurant in the C-1 zone located at 2571 Mission Street. The application requires the following actions:
• Variance Case No. VAR 24-01: Pursuant to San Marino Municipal Code (SMMC) Section 23.03.01(C)(13)(d), businesses that are issued permits for the sale and consumption of alcoholic beverages shall be located at least five hundred feet (500') apart from each other. • Conditional Use Permit Case No. CUP 24-02: Pursuant to San Marino Municipal Code (SMMC) 23.03.01(C)(13), on-site sales and consumption of alcoholic beverages (beer and wine).
Shelley Boyle, Chair
John Dustin, Vice Chair
Kevin Cheng, Commissioner
Joyce Gatsoulis-Batnij, Commissioner
Sharon Mequet, Commissioner
PAGE 20 of 623
PROJECT BACKGROUND
General Plan: Commercial
Zoning: C-1
Location: The subject property is located on the
north side of Mission Street between S Los
Robles Avenue and S Euclid Avenue.
Building/Tenant Size: 4,826 square feet (building) /
920 square feet (tenant)
Lot Size: 5,927 square feet
Previous Use: Deli/Small Restaurant – Provisions (same
as current use)
Surrounding Uses: The site is bordered by commercial uses to the east and west and by residential
uses to the north and south.
Proposed Use: Deli/Small Restaurant – Provisions
Parking Required: 1 for every 250 square feet of gross floor area.
Environmental Determination: Categorically Exempt under Section 15301, (Existing Facilities)
BUSINESS BACKGROUND
Provisions, the existing deli/small restaurant has been operating since January 2023, at the aforementioned address. The business is now requesting to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 920 square-foot small restaurant.
ENVIRONMENTAL FINDING
The project proposes to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing square-foot deli/small restaurant within 500 feet of another alcohol license. Pursuant to Section 21084 of the California Public Resource Code, the proposed project is PAGE 21 of 623
exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines, Article 19, Section 15301, Class 1 (Existing Facilities), and there is no substantial evidence demonstrating that an exception to a categorical exemption pursuant to CEQA Guidelines, Section 15300.2 applies.
DISCUSSION
ANALYSIS
Conditional Use Permit 24-02
The applicant applied to the California Department of Alcohol Beverage Control (ABC) for a Type 41 alcohol license (“On-Sale Beer & Wine – Eating Place”).
A Type 41 alcohol license authorizes the sale and consumption of beer and wine on or off the premises where sold. Type 41 alcohol licenses also have the following provisional conditions:
• Distilled spirits may not be on the premises (except brandy, rum, or liqueurs for use solely for cooking purposes).
• Must operate and maintain the licensed premises as a bona fide eating place.
• Must maintain suitable kitchen facilities and must make actual and substantial sales of meals for consumption on the premises. • Minors are allowed on the premises.
Staff has included ABC’s provisional conditions above in the City’s Standard Conditions of Approval for Provision’s CUP application (CUP No. 24-06). For reference, attached is the City’s Standard Conditions of Approval (Attachment 5).
The conditions for on-site retailers of beer and wine as required by SMMC Section 23.03.01 are outlined below. The purpose of these restrictions is to ensure that the sale and consumption of alcoholic beverages is ancillary to the use of the premises as a restaurant for the consumption of complete meals and to ensure that the premises does not develop into a lounge, or other facility where the sale and consumption of alcoholic beverages is the primary use.
a) Establishments that are limited to the onsite sale and consumption of beer and wine are permissible on any C-1 zoned property and are subject to the conditions described in this use.
b) The C-1 commercial zone on Mission Street shall be limited to the onsite sale and consumption of beer and wine, subject to the conditions described in this use.
PAGE 22 of 623
c) There shall be no lounge area upon the licensed premises. d) The sale and consumption of alcoholic beverages shall be an ancillary use to a restaurant that serves complete meals.
e) Pool tables and other types of amusement devices are prohibited from the restaurant and/or bar.
f) Dance floors are also prohibited.
g) There shall be no exterior advertising of any kind or type including advertising directed to the exterior from within, promoting or indicating the availability of alcoholic beverages. Interior displays of beer and wine which are clearly visible to the exterior shall not be permitted. h) The quarterly gross sales of alcoholic beverages shall not exceed thirty percent (30%) of all gross sales of all food products sold for consumption on the premises during the same period. The licensee shall at all times maintain records which reflect separately the gross sales of alcoholic beverages and the gross sales of all other items at the licensed business. Said records shall be totaled no less frequently than on a quarterly basis and shall be made available to the city of San Marino on demand.
i) The premises shall possess the necessary utensils, table service, and condiment dispensers with which to serve complete meals to the public. j) There shall be no serving and/or sales of alcoholic beverages prior to eleven o'clock (11:00) A.M. or later than twelve o'clock (12:00) midnight on Fridays and Saturdays; all other days, there shall be no serving and/or sales of alcoholic beverages prior to eleven o'clock (11:00) A.M. or later than ten o'clock (10:00) P.M. The serving and/or sales of beer and wine on Mission Street shall be prohibited prior to eleven o'clock (11:00) A.M. or later than ten o'clock (10:00) P.M. k) The purpose of these restrictions is to ensure that the sale and consumption of alcoholic beverages is ancillary to the use of the premises as a restaurant for the consumption of complete meals and to ensure that the premises does not develop into a lounge, or other facility where the sale and consumption of alcoholic beverages is the primary use.
ABC requires Type 41 alcohol business licensees to operate and maintain the licensed premises as a bona fide eating place, maintain suitable kitchen facilities, and make actual and substantial sales of meals for consumption on the premises. The applicant’s business operations statement confirms that alcoholic drinks will be served only with dine-in services. Examples of the complete meals proposed to be provided by the restaurant are Panko Crusted Chicken with Farro and Fresh Herbs, Grass-Fed Beef Burger with Farm-Fresh Greens and Tomato Confit, and Daily Pasta.
PAGE 23 of 623
Variance 24-01
Pursuant to SMMC Section 23.03.01 (C)(13)(d), on-site retailers of alcoholic beverages, beer, and wine, on premises, must be located at least five hundred feet (500') from businesses that are issued permits for the sale and consumption of alcoholic beverages.
Included in the report is a buffer map identifying all parcels within 500 feet of the subject property (Attachment 4). There are three restaurants within 500 feet of the subject project, which are Cielo San Marino, San Marino Café, and Julienne Fine Foods and Celebrations. Cielo San Marino is located approximately 420 feet from the restaurant. San Marino Café is located approximately 240 feet from the restaurant. Julienne Fine Foods and Celebrations is located approximately 400 feet from the restaurant.
Consequently, the applicant is requesting approval of a Variance to allow the restaurant to deviate from the City’s distance requirement and be allowed to serve beer and wine with meals within 500 feet of another establishment offering the same service.
CONDITIONAL USE PERMIT FINDINGS (CUP 24-02)
Conditional Use Permit – (on-site sales and consumption of alcoholic beverages)
In examining the Conditional Use Permit requests, the Planning Commission must make sure that the conditions will be consistent with the required findings. Section 23.07.0(A) of the San Marino City Code states that the reviewing body shall approve the application if it finds all of the following to be true:
1. That the establishment, maintenance or operation of the use or building applied for will not, under the circumstances of the particular case, be detrimental to the health, safety, peace, morals, comfort or general welfare or persons residing in or working in the area of such proposed use nor be detrimental or injurious to property or improvements in the neighborhood or to be general welfare of the City.
Staff finds the establishment of on-site sales and consumption of alcoholic beverages will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing in the area.
The applicant’s business operations statement confirms that alcoholic drinks will be served only with complete meals. The proposed conditions of approval PAGE 24 of 623
stipulate that the on-site sales and consumption of alcoholic beverages shall be made only when accompanied by the sale of a complete meal.
The proposed conditions of approval preclude the following business practices and layout: beer and wine advertisement; a lounge area, a dance floor, pool tables and other types of amusement devices. These specific business practices result in high parking demand, rather than increasing meal purchases, and are therefore prohibited.
Therefore, this project meets this finding.
2. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, walls and fences, parking and loading, landscaping, and other development features prescribed in this Chapter or required by the Commission in order to integrate said conditional use with the land and uses in the neighborhood.
The on-site sales and consumption of alcoholic beverages (beer and wine) are ancillary to the deli/small restaurant use. The proposed conditions of approval preclude the following business practices and layout; beer and wine advertisement; a lounge area, a dance floor, pool tables, and other types of amusement devices. These specific business practices result in high parking demand, rather than, increasing meal purchases.
As such, this project meets this finding.
3. That proposed conditional use will not have a detrimental effect upon the nature, condition and development of nearby uses and buildings.
The proposed conditional use will allow the applicant to serve beer and wine with complete meals only. The conditional use will not have a detrimental effect upon the nature, condition, and development of nearby uses, as the proposed beer and wine service offered in conjunction with the restaurant’s existing meal service will not alter the operational characteristics and hours for the surrounding uses. Additionally, the San Marino Police Department (SMPD) reviewed the proposed conditional use permit and did not identify that the alcohol license would be detrimental in nature to nearby uses or buildings.
Therefore, this project meets this finding.
4. That the site for the proposed conditional use will relate to streets and highways adequate in width and pavement to carry the kind and quantity of traffic such use would generate.
PAGE 25 of 623
This condition is not applicable for an alcohol conditional use permit.
As such, this project meets this finding.
VARIANCE FINDINGS (VAR 24-01)
Variance – (on-site sales and consumption of alcoholic beverages within 500 feet of another alcohol license)
In examining Variance requests, the Planning Commission must make sure that the conditions will be consistent with required findings. Per Section
23.07.03 of the San Marino City Code, the Planning Commission shall approve the application if it finds all of the following to be true:
1. That strict application of the regulations and standards of this Chapter will result in practical difficulties or unnecessary hardships inconsistent with the general purpose and intent of said regulations and standards.
SMCC Section 23.03.01C states that an establishment shall be located at least 500 feet apart from another establishment that offers on-site sales and consumption of alcoholic beverages. There are three restaurants within 500 feet of the subject project, which are Cielo San Marino, San Marino Café, and Julienne Fine Foods and Celebrations.
Cielo San Marino is located approximately 420 feet from the restaurant.
San Marino Café is located approximately 240 feet from the restaurant.
Julienne Fine Foods and Celebrations is located approximately 400 feet from the restaurant. Consequently, the applicant is requesting approval of a Variance to allow the restaurant to deviate from the City’s distance requirement and be allowed to serve beer and wine with meals within 500 feet of another establishment offering the same service.
The existing restaurant is located within the area identified in the City’s Economic Development Action Plan (EDAP) as the Shops at Mission Village. The EDAP calls for creating an environment that supports and strengthens existing business areas, attracts new businesses, creates employment opportunities, helps create a strong economic foundation for the community, and improves city revenue. Based on the City’s layout, there are only two areas where restaurants are allowed, which are the Huntington Corridor along Huntington Drive and the Shops at Mission Village along Mission Street. The EDAP identifies full-service restaurants within a list of top unfulfilled land use categories that would complement the San Marino community.
PAGE 26 of 623
In addition to identifying restaurants as a desirable land use, the EADP states that the economic vision for the Shops at Mission Village should be for businesses to provide services to the adjacent residential neighborhoods in San Marino, as well as the communities of Pasadena and Alhambra. Mission Village can continue to be a thriving business district with a mix of uses, including retail, restaurant, and office, to capitalize on the area’s residential base and guests visiting The Langham.
As the City has only two commercial zones, limiting where restaurants can be located, the strict application of the regulations and standards of this Chapter results in practical difficulties or unnecessary hardships inconsistent with the general purpose and intent of said regulations and standards. Potential and realistic locations to facilitate the location of the project’s restaurant serving beer and wine to complement meals is restrictive. Additionally, the City’s EDAP encourages full-service restaurants, but there is limited space to facilitate restaurants consistent with the City’s EDAP. The issuance of the variance would allow the property owner to have the same rights enjoyed by nearby restaurants within the Shops at Mission Village that are identically zoned.
As such, this project meets this finding.
2. That the variance, if granted, will not constitute a grant of special privilege inconsistent with the limitations upon other properties in the vicinity and zone in which the subject property is situated.
Granting the variance would not constitute the granting of a special privilege inconsistent with the limitations of other properties in the same zoning district because: (1) the permitted primary use of the property will remain a deli/small restaurant offering complete meals, consistent with the three existing restaurants located within the Shops at Mission Village; and (2) the proposed deviation from the required 500-foot separation from another establishment that offers on-site sales and consumption of alcoholic beverages will allow the applicant to enjoy the same privileges enjoyed by two existing restaurants located within the Shops at Mission Village with the same zoning designation, C-1.
SMCC Section 23.03.01(C), requires that an establishment offering onsite sales and consumption of alcoholic beverages shall be located at least 500 feet apart from another establishment that provides the same service. The nearest restaurant that serves beer & wine is San Marino Café which is located approximately 240 feet from Provisions. The ability to offer beer and wine to complement the meals offered by the restaurant is consistent with the same amenities offered by the three PAGE 27 of 623
restaurants located within the Shops at Mission Village. Additionally, the EDAP identifies full-service restaurants within a list of top unfulfilled land use categories that would complement the San Marino community. The City’s Economic Development strategy includes an incentive that supports the City waiving fees associated with a conditional use permit request for restaurants seeking to offer beer and wine to complement meals offered by the restaurants. The proposed conditional use will not constitute a grant of special privilege inconsistent with the limitations put upon other properties in the vicinity and zone in which the subject property is situated, based on the limited availability of commercial space that could accomodate a full-service restaurant that offers the sale of beer and wine for on-site consumption.
Based on the aforementioned, this project meets this finding.
3. That, because of special circumstances applicable to the subject property, including size, shape, topography, location or surroundings, the strict application of this Chapter will deprive the applicant of a reasonable utilization of such property.
Pursuant to City Code Section 23.03.01(C), an establishment shall be located at least 500 feet apart from another establishment that offers on-site sales and consumption of alcoholic beverages. The nearest restaurant that serves beer & wine is San Marino Café, which is located approximately 240 feet from Provisions. Consequently, the applicant is requesting approval of a variance to allow the existing restaurant to deviate from the City’s distance requirement and be allowed to serve beer and wine with meals within 500 feet of another establishment offering the same service.
The existing restaurant is located within the area identified in the City’s Economic Development Action Plan (EDAP) as the Shops at Mission Village. The EDAP calls for creating an environment that supports and strengthens existing business areas, attracts new businesses, creates employment opportunities, and helps create a strong economic foundation for the community, as well as improves city revenue. Based on the City’s layout, there are only two areas where restaurants are allowed: the Huntington Corridor along Huntington Drive and the Shops at Mission Village along Mission Street. The EDAP identifies full-service restaurants within a list of top unfulfilled land use categories that would complement the San Marino community.
The EDAP identifies specific tasks necessary to implement the economic vision for the Shops at Mission Village, including funding an incentive program to help existing and future businesses with establish or expand within the Mission Village.
PAGE 28 of 623
The City is primarily a residential community with limited commercial opportunities along the Huntington Corridor and the Shops at Mission Village. The EDAP identifies restaurants as a desirable land use and encourages outdoor dining for restaurants. The EDAP states that the economic vision for the Shops at Mission Village should be for businesses to provide services to the adjacent residential neighborhoods in San Marino, as well as the communities of Pasadena and Alhambra. Mission Village is envisioned as a thriving business district with a mix of uses including retail, restaurant, and office to capitalize on the area’s residential base as well as guests visiting The Langham.
Based on the City having only two commercial zones limiting where restaurants can be located, the strict application of the regulations and standards of this Chapter results in practical difficulties or unnecessary hardships inconsistent with the general purpose and intent of said regulations and standards. Potential and realistic locations to facilitate the location of the project’s restaurant serving beer and wine to complement meals is restrictive. Additionally, the City’s EDAP encourages full-service restaurants and outdoor dining for the Shops at Mission Village, but there is limited space to facilitate restaurants consistent with the City’s EDAP. The issuance of the variance would allow the property owner enjoy the same rights as nearby restaurants within the Shops at Mission Village that is identically zoned.
As such, this project meets this finding.
4. That the use or development applied for will not be materially detrimental to the public health, safety or general welfare or injurious to property or improvements in the zone or
neighborhood in which the property is located.
There will be no negative impacts to the public health, safety or welfare of people or property in reference to this variance request because the deli/small restaurant offering on-site sales and consumption of alcoholic beverages is located more than the required 500 feet from public and private school properties. Additionally, the San Marino Police Department (SMPD) reviewed the proposed variance and did not identify a public health, safety or general welfare concern that could not be mitigated.
The proposed request will not alter the primary use of the deli/small restaurant, which is similar to the two existing restaurants located within the Shops at Mission Village. The restaurant is served by existing public streets, provides adequate parking, and is served by the proper utilities.
As such, this project meets this finding.
PAGE 29 of 623
5. That, because of circumstances relating to or conditions applicable to the property in question, it would be unreasonable and a deprivation of any practical use of the property to deny such variance; except whenever the application involves a fence, yard, setback or bulk variance (as opposed to a use, parking or other type variance), it shall not be necessary to make a finding on this point.
The project site is located within the C-1 zone and the Shops at Mission Street are designated as Focus Area 2 in the City’s EDAP. The applicant requests approval of a variance to allow the existing restaurant to deviate from the City’s distance requirement and be authorized to serve beer and wine with meals within 500 feet of another establishment offering the same service. The EADP identifies the need for full-service restaurants and outdoor dining areas.
There are currently three existing restaurants that offer on-site sales and the consumption of alcoholic beverages to complement their meals within the Shops at Mission Street. Julienne’s is one of the restaurants offering on-site sales and consumption of alcoholic beverages to complement their meals within the Shops at Mission Village, located between El Molino Avenue and Los Robles Avenue. San Marino Café is the second restaurant offering on-site sales and consumption of alcoholic beverages to complement their meals, located between Los Robles Avenue and Euclid Avenue. Cielo San Marino is the third restaurant offering on-site sales and consumption of alcoholic beverages to complement their meals, located between Las Flores Avenue and Euclid Avenue. The strict application of the 500 foot distance requirement between establishments offering sales and consumption of alcoholic beverages would be unreasonable and a deprivation of any practical use of the property because the commercial structure was constructed specifically to contain restaurant uses consistent with the City’s EDAP. Any structure located within the Mission District would be unable to contain a full-service restaurant offering on-site sales and consumption of alcoholic beverages without the approval of a variance, since every structure is located less than 500 feet from each other.
Based on the aforementioned, this project meets this finding.
RECOMMENDATION
Based on the information submitted to the record, staff recommends that the Planning Commission:
PAGE 30 of 623
1. Determine that based on the whole of the administrative record, the proposed project is exempt from CEQA pursuant to State CEQA Guidelines, Section 15301 (Existing Facilities & New copy on existing on and off-premise sign), and that there is no substantial evidence demonstrating an exception to the categorical exemption pursuant to CEQA Guidelines Section 15300.2 applies;
2. Adopt Resolution PCR 25-11 approving Variance Case No. VAR 24-01 & Conditional Use Permit Case No. CUP 24-02, subject to certain findings and conditions.
ATTACHMENTS
1. Site Plan and Floor Plan
2. Provisions Business Operations Statement and Restaurant Menu
3. VAR 24-01 & CUP 24-02 Radius Map (300’ for Legal Noticing)
4. Radius Map (500’ Buffer Zone)
5. Draft PCR 25-11
PAGE 31 of 623
PAGE 32 of 623
PAGE 33 of 623
PAGE 34 of 623
PAGE 35 of 623
PAGE 36 of 623
PAGE 37 of 623
PAGE 38 of 623
PAGE 39 of 623
Restaurant Business Operations Statement
Our restaurant aims to deliver an exceptional dining experience through high-quality food, excellent service, and a welcoming atmosphere. We are committed to maintaining operational excellence by ensuring efficient kitchen management, sourcing fresh and locally grown ingredients, and providing outstanding customer service. Our operations are streamlined to optimize food preparation and minimize wait times, ensuring a smooth and efficient experience for our guests.
The restaurant will be six days a week, with well-defined opening and closing hours, and will prioritize hygiene, safety, and sustainability in all areas. Staff will receive regular training in both culinary skills and customer service, fostering a team-oriented environment. We will maintain inventory control to minimize waste and manage costs, ensuring profitability while still providing value to our customers. Regular reviews of the business processes will ensure continuous improvement and the ability to adapt to changing customer preferences and market trends.
Menu:
• Appetizers:
o Warm nuts and olives
o Market Salad
o Seasonal dip
o Seasonal vegetables
o Oyster and raw bar
• Entrees:
o
o Panko Crusted Chicken with Farro and Fresh Herbs
o Grass-Fed Beef Burger with Farm-Fresh Greens and Tomato Confit o Daily Pasta
• Desserts:
o Seasonal Fruit Crisp
o Chocolate Lava Cake
o Tiramisu
Hours of Operation:
• Tuesday to Sunday: 10:00 AM - 8:00 PM
Seating Capacity:
• The restaurant currently has a seating capacity of 18 guests. We hope to apply to the City to accommodate outdoor seating options.
Alcohol Sold:
PAGE 40 of 623
• Our bar will offer a selection of natural wines, craft beers, and specialty non-alcoholic mocktails for on-site consumption
By combining great food, a vibrant atmosphere, and a wide selection of beverages, we are dedicated to creating a memorable dining experience for every guest. Our operational strategy focuses on quality, efficiency, and customer satisfaction, ensuring a thriving and sustainable business.
PAGE 41 of 623
!!"#!$% &
'(()*"
+))*&*)+(,+-*(./+0&120
-+345,*,23
*(+6,36
78../3(98,-4
:(0-
).,3()./5,/;&'(0- !
!!
PAGE 42 of 623
PAGE 43 of 623
PAGE 44 of 623
PAGE 45 of 623
PAGE 46 of 623
PAGE 47 of 623
PAGE 48 of 623
PAGE 49 of 623
PAGE 50 of 623
PAGE 51 of 623
PAGE 52 of 623
San Marino Tribune
23-12-25 - W0010722
OTHER Outlook Newspapers
05/15/2025
05/15/2025
05/15/2025
Publication: This space is reserved for Clerk’s Filing Stamp Outlook Control #:
Ad Description:
Publication Dates:
PROOF OF PUBLICATION
2015.5 C.C.P.
State of CA, County of Los Angeles
I certify (or declare) under the penalty of perjury that the following is true and correct.
SPECIAL MEETING OF THE SAN MARINO
PLANNING COMMISSION
CITY COUNCIL CHAMBERS,
2200 HUNTINGTON DR., SAN MARINO, CA
MAY 27, 2025, AT 6:00 P.M.
Public Hearing
ACTION BEING CONSIDERED:
The applicant requests to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 820 squarefoot deli/small restaurant in the C-1 zone located at 2571 Mission Street.
The application requires the following actions:
• Variance Case No. VAR 24-01: Pursuant to San Marino Municipal Code (SMMC) Section 23.03.01(C)(13)(d), businesses that are issued permits for the sale and consumption of alcoholic beverages shall be located at least five hundred feet (500’) apart from each other. • Conditional Use Permit Case No. CUP 24-02: Pursuant to San Marino Municipal Code (SMMC) 23.03.01(C)(13), on-site sales and consumption of alcoholic beverages (beer and wine).
RECOMMENDATION:
Staff recommends that the Planning Commission:
Determine that based on the whole of the administrative record, the proposed project is exempt from CEQA pursuant to State CEQA Guidelines, Section 15301 (Existing Facilities & New copy on existing on and off-premise sign), and that there is no substantial evidence demonstrating an exception to the categorical exemption pursuant to CEQA Guidelines Section 15300.2 applies;
Adopt Resolution PCR 25-11 approving Variance Case No. VAR 24-01 & Conditional Use Permit Case No. CUP 24-02, subject to certain findings and conditions.
Please be advised that the date, time, and place of the hearing is as follows:
DATE: May 27, 2025
TIME: 6:00 P.M.
PLACE: City Council Chambers, 2200 Huntington Dr., San Marino, CA 91108
The public is welcome to attend the meeting in person or remotely via Zoom; however, the meeting will proceed as normal even if there are technical difficulties with Zoom. The City will do its best to resolve any technical issues as quickly as possible. Members of the public may access the meeting electronically by visiting the following webpage: www.CityofSanMarino.org/ Zoom.
This public hearing will be held in-person at the City Hall Council Chambers, located at 2200 Huntington Drive, San Marino, CA 91108; members of the public may attend. For further information, please see the meeting agenda and staff reports posted on the City’s website: www.SanMarinoCA.gov. The meeting agenda will be published on or before Friday, May 23, 2025.
All interested persons are invited to inspect the file and to be present to give testimony at the public hearing. Should you have any questions prior to the meeting or to schedule an appointment to view the documents, please contact Camillia Martinez, Associate Planner, at (626) 300-0713 or cmar[email protected].
CEQA:
The project proposes to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing square-foot deli/small restaurant within 500 feet of another alcohol license. Pursuant to Section 21084 of the California Public Resource Code, the proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines, Article 19, Section 15301, Class 1 (Existing Facilities), and there is no substantial evidence demonstrating that an exception to a categorical exemption pursuant to CEQA Guidelines, Section 15300.2 applies.
May 15 2025, San Marino Tribune
Signature
Outlook Newspapers Group
PO Box 578
La Cañada Flintridge, CA 91012
PROOF OF PUBLICATION
SAN MARINO TRIBUNE
2650 San Marino Avenue, Suite 209
San Marino, CA 91108
(626) 792-6397
I am a citizen of the United States and employed by a
publication in the County aforesaid; I am over the age
of eighteen years, and not a party to or interested in
the mentioned matter. I am the principal clerk of the
San Marino Tribune, a newspaper published weekly in
the City of San Marino, County of Los Angeles, and
adjudged a newspaper of general circulation by the
Superior Court of the County of Los Angeles, State
of California, on the date of February 13, 1931, Case
Number 315-381. The notice, of which the attached is
a printed copy (set in type not smaller than nonpareil) has been published in each regular and entire issue of
said newspaper and not in any supplement thereof on
the following dates, to-wit:
Dated in San Marino, California
PAGE 53 of 623
SPECIAL MEETING OF THE SAN MARINO
PLANNING COMMISSION
CITY COUNCIL CHAMBERS,
2200 HUNTINGTON DR., SAN MARINO, CA
MAY 27, 2025, AT 6:00 P.M.
Public Hearing
ACTION BEING CONSIDERED:
The applicant requests to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing 820 square-foot deli/small restaurant in the C-1 zone located at 2571 Mission Street. The application requires the following actions:
• Variance Case No. VAR 24-01: Pursuant to San Marino Municipal Code (SMMC) Section
23.03.01(C)(13)(d), businesses that are issued permits for the sale and consumption of alcoholic beverages shall be located at least five hundred feet (500') apart from each other. • Conditional Use Permit Case No. CUP 24-02: Pursuant to San Marino Municipal Code (SMMC) 23.03.01(C)(13), on-site sales and consumption of alcoholic beverages (beer and wine).
RECOMMENDATION:
Staff recommends that the Planning Commission:
1. Determine that based on the whole of the administrative record, the proposed project is exempt from CEQA pursuant to State CEQA Guidelines, Section 15301 (Existing Facilities & New copy on existing on and off-premise sign), and that there is no substantial evidence demonstrating an exception to the categorical exemption pursuant to CEQA Guidelines Section 15300.2 applies;
2. Adopt Resolution PCR 25-11 approving Variance Case No. VAR 24-01 & Conditional Use Permit Case No. CUP 24-02, subject to certain findings and conditions.
Please be advised that the date, time, and place of the hearing is as follows:
DATE: May 27, 2025
TIME: 6:00 P.M.
PLACE: City Council Chambers, 2200 Huntington Dr., San Marino, CA 91108 PAGE 54 of 623
2 The public is welcome to attend the meeting in person or remotely via Zoom; however, the meeting will proceed as normal even if there are technical difficulties with Zoom. The City will do its best to resolve any technical issues as quickly as possible. Members of the public may access the meeting electronically by visiting the following webpage: www.CityofSanMarino.org/Zoom.
This public hearing will be held in-person at the City Hall Council Chambers, located at 2200 Huntington Drive, San Marino, CA 91108; members of the public may attend. For further information, please see the meeting agenda and staff reports posted on the City’s website: www.SanMarinoCA.gov.
The meeting agenda will be published on or before Friday, May 23, 2025.
All interested persons are invited to inspect the file and to be present to give testimony at the public hearing. Should you have any questions prior to the meeting or to schedule an appointment to view the documents, please contact Camillia Martinez, Associate Planner, at (626) 300-0713 or [email protected].
CEQA:
The project proposes to provide on-site sales and consumption of alcoholic beverages (beer and wine) as an ancillary use to an existing square-foot deli/small restaurant within 500 feet of another alcohol license. Pursuant to Section 21084 of the California Public Resource Code, the proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines, Article 19, Section 15301, Class 1 (Existing Facilities), and there is no substantial evidence demonstrating that an exception to a categorical exemption pursuant to CEQA Guidelines, Section 15300.2 applies.
PAGE 55 of 623
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Isidro Figueroa, Community Development Director
DATE: September 26, 2025
SUBJECT: PUBLIC HEARING TO CONSIDER ADOPTION OF
ORDINANCE NO. O-25-1421 (SECOND READING) AND
URGENCY ORDINANCE NO. O-25-1423-U, ADOPTING
THE 2025 EDITIONS OF THE CALIFORNIA BUILDING
STANDARDS CODES AND ADOPTION OF RESOLUTION
NO. R-25-23
STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Efficient, Responsive, and Effective City Services
Well-Maintained Infrastructure
Safe Community
Beautiful, Preserved, Single-Family Neighborhoods
BACKGROUND
Section 17958 of the California Health and Safety Code requires that the latest California Codes apply to local jurisdictions 180 days after they become effective at the State level. California Building Standards Commission adopts and publishes the California Building Standards Code (Title 24 California Code of Regulations) every three (3) years. The State’s Health and Safety Code also requires local governments to adopt the most recent editions of these codes.
On July 1, 2025, The California Building Standards Commission (the Commission) published the 2025 Edition of the Building Standards Codes and they become effective at the local level on January 1, 2026. Local amendments are allowed, provided they are more restrictive and reasonably necessary due to the local climatic, geological, and topographical characteristics.
Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 56 of 623
The Commission completed the adoption and approval of the following building standards that are applicable to the City:
2025 California Building Code
2025 California Residential Code
2025 California Plumbing Code
2025 California Mechanical Code
2025 California Electrical Code
2025 California Energy Code
2025 California Fire Code
2025 California Green Building Standards Code
2025 Referenced Standards Code
2025 Existing Buildings Code
2025 Historical Building Code
2025 Administrative Standards
A complete set of the 2025 California Building Standards Codes is available for review in the Community Development Department. The new codes are also available for viewing by visiting the Building Standards Commissions website at http://www.bsc.ca.gov/BSC/Codes.
In 2019, the Los Angeles County Appendix J Grading Standards Code was incorporated into the City’s Building Code in order to enhance the design and construction of both residential and commercial properties in order to control erosion and water run-off. At this time, staff is recommending adoption of the updated 2022 Edition of the Los Angeles County Appendix J Grading Standards Code without any technical amendments.
DISCUSSION
The Building Code updates do not necessitate any technical changes. The majority of the revisions are formatting adjustments, section relocations, and code number amendments to ensure consistency within the City’s Building Code and alignment with the 2025 California Building Standards Code.
Local Amendments
During this triannual Code Adoption process, the City is proposing to introduce the following technical amendments to the City’s Fire Code.
Article 12 “Fire Code”
Fire Code Amendments:
The most significant revisions to San Marino Fire Code include amendments concerning fire alarm system requirements for R-2 multi-unit dwellings; requirements to residential sprinkler systems to ensure protection of domestic PAGE 57 of 623
water systems; and numbering changes to ensure consistency with the 2026 California Fire Code.
Fire Alarm Requirement for Multi-family Residential Occupancies:
The Fire Code does not currently address the requirement for a fire alarm for R-2 multi-unit residential dwellings. This revision ensures that any future development of multi-unit residential dwellings remains consistent with current fire protection standards in the city and maintains the highest degree of safety to residents.
Domestic Water Supply Protection for Residential Occupancies:
Fire sprinklers in single-family homes, including Accessory Dwelling Units (ADUs), are classified as low-risk hazards by the State Water Resources Control Board (SWRCB). However, these systems still pose a potential contamination hazard to the domestic water supply. Residential fire sprinkler systems throughout California are installed in accordance with the State’s currently adopted NFPA Standard 13D, which defers cross-connection (contamination) control to the local jurisdiction. In San Marino, multiple water districts serve different areas of the city, each with its own perspectives, policies, and enforcement methods. The proposed amendments establish a uniform minimum standard to be enforced citywide—regardless of the water district.
Chapter 3 California Residential Building Code
Following a review of the 2025 California Wildland-Urban Interface Code, staff determined that although the City of San Marino does not contain any Statedesignated high-risk areas for wildfires, three provisions of the new Code will strengthen local fire safety. These provisions apply to new buildings, additions, or remodels within the City’s designated Very High Fire Hazard Severity Zone and address vents, open eaves, and enclosed eaves.
• Vents: Research has shown that vents are one of the most common points of entry for wind-driven embers during wildfires. Requiring ember-resistant vent assemblies or vents protected with noncombustible mesh significantly reduces the likelihood of ember penetration into attics or crawlspaces.
• Open Eaves: Open eaves create horizontal surfaces and cavities where embers can accumulate, ignite combustible materials, and spread flames to the building. Properly constructed or enclosing open eaves with ignition-resistant materials greatly reduces this vulnerability. • Enclosed Eaves: Enclosed eaves limit ember intrusion, but their effectiveness depends on the use of noncombustible or ignition-resistant materials. Properly constructed enclosed eaves prevent ember entry PAGE 58 of 623
into concealed spaces where smoldering can lead to delayed ignition and structural loss.
Adopting these provisions will improve community resilience, align with state best practices, and reduce the risk of fire spread within San Marino’s most vulnerable areas.
Process
The process for the adoption of this Ordinance is different than other ordinances. Typically, an ordinance is introduced for first reading at one meeting and then placed on the City Council’s consent calendar for adoption at a subsequent meeting. In this case, State law requires that a public hearing be conducted at the time of the second reading. This evening, the City Council is being asked to conduct a public hearing and give second reading and consider adoption of the Ordinance approving the code amendments.
Resolution No. R-25-23 adopting findings of necessity and need for amendments, deletions, and additions to the 2025 California Building Standards Code based on local conditions is also included for the Council’s consideration and possible adoption.
Finally, Urgency Ordinance No. O-25-1423-U is included for the Council’s consideration and possible adoption. Recently enacted AB130 prohibits the imposition of additional building standards to residential dwellings beginning in October 2025. The codes described above relate to the public health, safety and welfare and adoption via an urgency ordinance will result in the code updates taking effect immediately, which is needed to protect the public health, safety and welfare from potentially harmful consequences of the restrictions set forth in AB130.
Summary
On September 10, 2025, City Council held the first reading, and scheduled the public hearing and second reading of Ordinance No. O-25-1421 for the September 26, 2025, City Council meeting.
FISCAL IMPACT & PROCUREMENT REVIEW
None.
LEGAL REVIEW
The City Attorney's office has reviewed and approved as to form.
PAGE 59 of 623
RECOMMENDATION
Staff recommends the Council conduct the public hearing, adopt Ordinance No. O-25-1421, Urgency Ordinance No. O-25-1423-U and adopt Resolution No. R-25-23. If the City Council concurs with staff’s recommendation, the appropriate motion would be:
“I move to waive full reading and adopt Ordinance No. O-25-1421, an Ordinance of the City of San Marino Adopting by Reference the 2025 Editions of the California Administrative, Building, Mechanical, Plumbing, Electrical, Residential, Fire, Energy, Green Building Standards, Historical Building, Existing Building, Appendix J Los Angeles County Grading Standards and Referenced Standards Codes, with Certain Amendments, Deletions and Additions, and Amending Chapter 25 of the San Marino Municipal Code, and Urgency Ordinance No. O-25-1423-U, an urgency version of Ordinance No. O25-1421, and to adopt Resolution No. R-25-23.”
ATTACHMENTS
1. Ordinance No. O-25-1421
2. Urgency Ordinance No. O-25-1423-U
3. Resolution No. R-25-23
PAGE 60 of 623
ORDINANCE NO. O-25-1421
AN ORDINANCE OF THE CITY OF SAN MARINO ADOPTING BY
REFERENCE THE 2025 EDITIONS OF THE CALIFORNIA
ADMINISTRATIVE, BUILDING, MECHANICAL, PLUMBING,
ELECTRICAL, RESIDENTIAL, FIRE, ENERGY, GREEN BUILDING
STANDARDS, HISTORICAL BUILDING, EXISTING BUILDING,
APPENDIX J LOS ANGELES COUNTY GRADING STANDARDS AND
REFERENCED STANDARDS CODES, WITH CERTAIN AMENDMENTS,
DELETIONS AND ADDITIONS, AND AMENDING CHAPTER 25 OF THE
SAN MARINO MUNICIPAL CODE
THE CITY COUNCIL OF THE CITY OF SAN MARINO DOES ORDAIN
AS FOLLOWS:
SECTION 1. RECITALS
WHEREAS, the City Council of the City of San Marino does hereby find that there is a need to enforce the most current editions of the California Building Standards Code, with local amendments thereof, as recited herein for regulating and controlling the design, erection, construction, enlargement, installation, alteration, repair, relocation, removal, use and occupancy, demolition, conversion, height and area, location and maintenance, and quality of materials of all buildings and structures and plumbing, mechanical, electrical and fire suppression systems and certain equipment within the City; and
WHEREAS, The City of San Marino is located in an area subject to climatic conditions with long periods of low humidity and hot weather, combined with unpredictable seasonal Santa Ana high wind conditions resulting in increased exposure to fire risk; and WHEREAS, the City Council does hereby further find that in accordance with section 15061(b)(3) of the California Code of Regulations, the adoption of these local amendments to the California Building Standards Code, and amendments to the San Marino Municipal Code are exempt from the provisions of the California Environmental Quality Act because such actions are administrative in nature; and
WHEREAS, the City Council does hereby further find that in accordance with section15061 (b)(3) of the California Code of Regulations, the adoption of these local amendments to the California Building Standards Code, and amendments to the San Marino Municipal Code are exempt from the provisions of the California Environmental Quality Act because such actions are largely administrative in nature, are designed to improve and not degrade environmental quality, and the impacts of these local amendments to the building standards code will not adversely affect the environment in any manner that could be significant.
Section 1. Articles 02 through 06, 09, 10, 12, 13, and 14 of Chapter 25, the “Uniform Codes” of the San Marino City Code, adopting by reference the 2016 Editions of the California Building, Mechanical, Plumbing, Electrical, Energy, Green Building Standards, Appendix J Los PAGE 61 of 623
Angeles County Grading Standards, Referenced Standards, and Fire Codes, and amendments thereto, are hereby repealed; provided, however, that such repeal shall not affect or excuse any violation of any of said codes occurring prior to the effective date of this ordinance.
Section 2. New Article 02 Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows with additions identified in red font:
CHAPTER XXV
UNIFORM CODES
ARTICLE 01
GENERAL PROVISIONS
SECTION:
25.01.01: Permits Required
25.01.02: Times Construction Prohibited
25.01.03: Work By Owner Permitted
25.01.04: Penalty For Violations
25.01.05: Property Owner Responsible
25.01.06: Property Maintenance Standards For Construction Projects
25.01.07: Expedited Electric Vehicle Charging Station Permitting
25.01.08: Definitions
25.01.09: Limitation On Authority - Board Of Appeals
25.01.10: Adoption Of Administrative Regulations
25.01.01: PERMITS REQUIRED:
It shall be unlawful for any person to begin or perform any construction work or construction activity or to cause or permit any construction work or construction activity, for which a permit is required by this chapter, to begin or perform on any residential or commercial parcel of property without having first obtained said permit. (Ord. 092-1015, 6-10-1992)
25.01.02: TIMES CONSTRUCTION PROHIBITED:
It shall be unlawful for any person to perform or to cause or permit to be performed any construction work or construction activity for which a permit is required by this chapter or for any person requiring a business license pursuant to chapter XI of this Code to perform or to cause or permit to be performed any construction work or construction activity on the following days: (Ord. 092-1015, 6-10-1992)
A. On Mondays through Fridays, before seven o'clock (7:00) A.M. and after six o'clock (6:00) P.M.; except, that the Director of Planning and BuildingCommunity Development Director may authorize, in connection with seismic upgrading or fire sprinkler installation, construction work or activity in the C-1 Zone to be performed outside between six o'clock (6:00) P.M. and nine o'clock (9:00) P.M. and inside an enclosed building after nine o'clock (9:00) P.M. Such construction work or activity shall be performed in compliance with any conditions the Director of Planning and BuildingCommunity Development Director shall impose to alleviate potential disturbance to surrounding properties.
PAGE 62 of 623
B. On Saturdays, before nine o'clock (9:00) A.M. and after four o'clock (4:00) P.M.; except, that the Director of Planning and BuildingCommunity Development Director may authorize, in connection with seismic upgrading or fire sprinkler installation, construction work or activity in the C-1 Zone to be performed outside between four o'clock (4:00) P.M. and nine o'clock (9:00) P.M. and inside an enclosed building after nine o'clock (9:00) P.M. Such construction work or activity shall be performed in compliance with any conditions the Director of Planning and BuildingCommunity Development Director shall impose to alleviate potential disturbance to surrounding properties. (Ord. 092-1027U, 8-12-1992)
C. Sundays.
D. The following holidays:
New Year's Day
Presidents' Day
Memorial Day
Fourth of July
Labor Day
Veterans Day
Thanksgiving
The Friday after Thanksgiving
Christmas Eve
Christmas Day
New Year's Eve
If any of the above holidays fall on a Saturday, construction work and construction activity shall be prohibited on the preceding Friday. If any of the above holidays fall on a Sunday, construction work and construction activity shall be prohibited on the following Monday.
This section shall not apply to the emergency repairs necessary for health, safety or preservation of property. (Ord. 092-1015, 6-10-1992)
25.01.03: WORK BY OWNER PERMITTED:
The owner or occupant of property within the City may perform construction activity or construction work during the times described in section 25.01.02 of this article, provided that the property owner or occupant performs the work himself. (Ord. 092-1015, 6-10-1992)
25.01.04: PENALTY FOR VIOLATIONS:
Any person who violates or causes or permits any person to violate section 25.01.01 of this article shall be required, at the time of obtaining the permits required by this chapter, to pay a penalty equal to one hundred percent (100%) of the total amount of all permit fees assessed for the PAGE 63 of 623
construction work or activity pursuant to this chapter in addition to the amount of the permit fees. (Ord. 092-1015, 6-10-1992; amd. Ord. 097-1107, 9-10-1997; Ord. 0-18-1335, 4-11-2018)
25.01.05: PROPERTY OWNER RESPONSIBLE:
The property owner or occupant of any property at which a violation of this chapter shall occur shall be responsible for and liable for charges provided for in section 25.01.04 of this article. (Ord. 092-1015, 6-10-1992; amd. Ord. 097-1107, 9-10-1997; Ord. 0-18-1335, 4-11-2018)
25.01.06: PROPERTY MAINTENANCE STANDARDS FOR CONSTRUCTION PROJECTS:
All projects, for which a valid building permit has been issued, with exception of interior remodels, shall be required to adhere to the following maintenance standards and no building or planning inspections shall be completed until all such applicable items are addressed:
A. One sign, visible from the street, must be posted, listing a contact name, company, and phone number. Said sign may be attached to a construction fence and must be six (6) square feet in area and no greater than thirty six inches (36") in length. No other signs shall be permitted in connection with the project.
B. Construction materials, equipment, storage bins, and portable facilities must be screened from public view.
C. Construction fencing must be installed on the site of any residential or commercial structure that is being, in whole or in part, demolished or reconstructed. Construction fencing must be installed in a manner that fully screens and secures the construction site. Construction fencing must include an opaque, dark-green screening material that is tightly secured to the fencing, free of holes and without advertising, except as allowed under subsection A of this section. The Director of Planning and BuildingCommunity Development Director, in his or her sole discretion, may require construction fencing on any other type of construction sites and may allow landscaping to substitute for some or all of the construction fencing. Construction fencing and any other approved screening material must be maintained in good condition.
D. A portable toilet shall be placed in the rear of the property with a minimum setback of ten feet (10') from side yard and rear yard property lines. If existing conditions prohibit access for the drop-off or the servicing of the portable toilet, the unit can be placed in the front yard provided the unit is placed no further than five feet (5') from the front of the house and ten feet (10') from any side property lines. The door opening shall not face either the street or an adjacent property and shall remain closed at all times. The portable toilet shall be screened from public view at all times.
No more than one toilet shall be used per property. The portable toilet shall be serviced a minimum of twice a week.
E. Roll-off containers shall be in good condition and appearance and emptied on a regular basis.
Containers shall be placed on private property unless an encroachment permit is obtained.
F. All construction equipment, storage bins and portable toilets shall be kept free of graffiti.
G. Construction materials, equipment, storage bins or debris shall not be placed on public property unless an encroachment permit has first been granted for such placement from Planning PAGE 64 of 623
and Building and the Public Works Department. Conditions may be imposed to ensure appropriate safety signage, insurance and bonds.
H. Any dirt or debris tracked onto streets and sidewalks shall be removed immediately. All trash and litter on the job site shall be removed from public view on a daily basis.
I. Construction worker vehicles, equipment, and gate fencing shall not block public sidewalks.
J. Existing landscaping shall be maintained in good condition, including the City parkway area.
The property owner or contractor shall be responsible for mowing, trimming, weeding, and irrigating these areas as needed throughout the duration of the construction project.
K. A waste management form/plan shall be submitted at plan check and project final whenever the scope of work proposes a residential addition of one thousand (1,000) square feet or more; new construction of one thousand (1,000) square feet or more; a demolition project of one thousand (1,000) square feet or more, or tenant improvement projects of three thousand (3,000) square feet or more.
L. A tree protection plan shall be submitted at plan check where any construction activity takes place within the drip line of the canopy of any established tree or any tree in the City parkway. A separate cut sheet shall also be submitted identifying all established trees on the property. The tree protection plan must be prepared by either a registered consulting arborist or a certified arborist with the International Society of Arborists. Prior to any demolition or construction, a registered project arborist must provide the City with written certification of compliance with the tree protection plan. After any demolition or construction, a registered project arborist must provide the City a written inspection report regarding the effectiveness of the measures in the tree protection plan.
M. Sandbags, silt screens, or any similar methods are required to be installed on all projects during the rainy season (October - April) to prevent dirt, mud, and debris from flowing into the storm drain system. This shall be required only when the front yard landscaping is either removed or modified, regardless whether such removal or modification was intended as part of the construction project.
N. A Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Planning and Building Department during the plan check process for all projects which disturb one or more acres of soil or whose projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres. Projects include soil excavation, soil grading or other construction activities where soil may be displaced during weather events or landscape water run-off. (Ord. 0-18-1337, 10-10-2018)
25.01.07: EXPEDITED ELECTRIC VEHICLE CHARGING STATION PERMITTING:
A. Purpose: The purpose of this section is to provide for expedited processing of applications for electric vehicle charging stations in compliance with Government Code section 65850.7.
B. Definitions: The following definitions shall apply for purposes of this section:
ELECTRIC VEHICLE CHARGING STATION OR CHARGING STATION: Means any level of electric vehicle supply equipment station that is designed and built in compliance with article PAGE 65 of 623
625 of the California Electric Code, as it read on January 1, 2016, and delivers electricity from a source outside of an electric vehicle into a plug-in electric vehicle.
ELECTRONIC SUBMISSION: Means a submission of an application utilizing email, the internet, and/or facsimile transmission.
SPECIFIC, ADVERSE IMPACT: Means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date an application was deemed complete.
C. Expedited Review Process:
1. The building official shall adopt a checklist of all application requirements for expedited building permits for electric vehicle charging stations. The checklist shall substantially conform to the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" found in the "Zero-Emission Vehicles in California: Community Readiness Guidebook" published by the Governor's Office of Planning and Research. The checklist, application form, and any other documents required by the building official to process an application shall be published on the City's website.
2. Anyone seeking to install an electric vehicle charging station at any site within the City may apply to the building official for an expedited nondiscretionary building permit.
3. An application for an expedited building permit for an electric vehicle charging station and all associated documentation may be submitted to the building official in person, by mail, or by electronic submission. Electronic signatures may be used in lieu of wet signatures.
4. An application that, in the opinion of the building official, satisfies the information requirements of the checklist adopted by the City shall be deemed complete.
5. If an application for an expedited building permit is deemed incomplete, the building official shall provide a written correction notice of the deficiencies and the additional information required to complete the application.
6. If the building official determines that an application for an expedited building permit is complete, the building official shall process the application. If the building official determines that the proposed charging station meets all health and safety requirements of State and Federal law, and would not have a specific, adverse impact upon the public health or safety, the application shall be approved and a building permit shall be issued.
7. If the building official finds, based on substantial evidence, that a proposed charging station could have a specific, adverse impact upon the public health or safety, the applicant must apply for an electric vehicle charging station use permit in order to install the proposed charging station.
8. An application for an electric vehicle charging station use permit shall be reviewed by the building official. The building official shall not deny such an application without making written findings, based upon substantial evidence in the record, that the proposed charging station would have a specific, adverse impact upon the public health or safety which could not feasibly be satisfactorily mitigated or avoided. The written findings required for rejection of an electric vehicle charging station use permit application shall include the building official's basis for rejecting any PAGE 66 of 623
potentially feasible alternatives that could mitigate or prevent the alleged adverse impact. Pursuant to Government Code section 65850.7, the building official's review shall be limited to health and safety issues. Aesthetic concerns, or other items not related to public health or safety shall not be considered.
9. A decision of the building official made pursuant to subsections C1 through C8 of this section may be appealed to the Planning Commission. The Planning Commission's review shall be subject to the same limitations as that of the building official, and only health and safety issues may be considered.
10. Any condition imposed on an application for an expedited building permit or electric vehicle charging station use permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
D. No Requirement For Association Approval: Consistent with Government Code section 65850.7, the building official shall not condition the approval for any electric vehicle charging station permit on the approval of such a system by a homeowners association, as that term is defined by Civil Code section 4080. (Ord. 0-17-1329, 10-11-2017; amd. Ord. 0-18-1335, 4-11- 2018)
25.01.08: DEFINITIONS:
The following definitions shall apply to all structures that are regulated by this chapter. If in conflict with other provisions of this Code, these definitions shall control.
APPLICANT: Shall mean an owner or other responsible person who applies for a building or other permit under this chapter, or an extension thereof.
INCOMPLETE STRUCTURE: Shall mean a structure, or portion thereof, for which a building permit under article 2 of this chapter, or an extension thereof, has expired. "Incomplete structure" shall also include those structures for which issued permits under articles 3 through 6 and 12 of this chapter, and any extensions thereof, have expired.
JUSTIFIABLE CAUSE: As used in sections 105.5.1 and 105.5.4 of the Building Code, and sections R105.5.1 and R105.5.4 of the Residential Code, shall mean or refer to a delay in performance of work or installations under an active permit that is due to war, insurrection, floods, earthquakes, fires, casualties, epidemics, quarantine restrictions, unusually severe weather, strikes causing inability to secure necessary labor, materials or tools, acts of the City, or any other delays that are beyond the control and without the fault of the permit holder.
OWNER: Shall mean and include any person having legal title to, or who leases, rents, occupies or has charge, control or possession of, any real property in the City, including all persons shown as owners on the last equalized assessment roll of the Los Angeles County Assessor's Office.
Owners include persons with powers of attorney, executors of estates, trustees, or who are courtappointed administrators, conservators, guardians or receivers.
COMMUNITY DEVELOPMENT DIRECTOR AND/OR PLANNING AND BUILDING DIRECTOR: Shall mean the building official, or a designee thereof.
PAGE 67 of 623
PROJECT: Shall mean an action or actions for which one or more permits are required by this chapter that concern a building or structure, or a portion thereof, with regard to construction, enlargement, alteration, repair, movement or demolition, and/or the erection, installation, enlargement, alteration, repair, removal, conversion or replacement of any electrical, fire- related, gas, mechanical or plumbing system, or portion thereof.
RESPONSIBLE PERSON: Shall mean any person, whether as an owner as defined in this section, or otherwise, who allows, causes, creates, maintains, suffers, or permits a public nuisance, or any violation of this chapter or other portion of this Code to exist or continue, by any act or the omission of any act or duty. A responsible person shall also include employees, principals, joint venturers, officers, agents, and/or other persons acting in concert with, or at the direction of, and/or with the knowledge and/or consent of the owner and/or occupant of the lot, building or structure on, or in which, a public nuisance or violation exists or existed. The actions or inactions of a responsible person's agent, employee, representative or contractor may be attributed to that responsible person.
STRUCTURE: Shall mean that which is built or constructed, an edifice, wall, fence, or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner.
SUCCESSFUL INSPECTION: Shall mean a required inspection (as set forth in section 110 of the Building Code or section 109 of the Residential Code) in which the work inspected was determined by the Planning and Building DirectorCommunity Development Director to meet all applicable minimum Building/Residential Code requirements and the inspection was approved and documented as successful. A successful inspection shall also mean approval of work inspected under an electrical, fire, plumbing or mechanical permit that meets all applicable minimum requirements of the Electrical, Fire, Plumbing or Mechanical Codes.
UNPERMITTED STRUCTURE: Shall mean any structure, or portion thereof, that was erected, constructed, enlarged, altered, repaired, moved, improved, removed, connected, converted, demolished or equipped with electrical, plumbing or mechanical installations, at any point in time, without the required approval(s) and permit(s) having first been obtained from the Planning and Building DirectorCommunity Development Director. Unpermitted structures shall include those structures for which an action that is regulated by the Fire Code has occurred without first obtaining the required permit. Unpermitted structures shall include an incomplete structure as defined in this section. (Ord. 0-18-1335, 4-11-2018)
25.01.09: LIMITATION ON AUTHORITY - BOARD OF APPEALS:
Notwithstanding any provision to the contrary in the most recent editions of the California Building, Electrical, Fire, Mechanical, Plumbing and Residential Codes (as adopted by the City), Boards of Appeal or similar reviewing authorities that are established by those codes shall not have the authority to consider determinations of the Planning and Building DirectorCommunity Development Director or other government officials, that a responsible person has violated this chapter. (Ord. 0-18-1335, 4-11-2018)
25.01.10: ADOPTION OF ADMINISTRATIVE REGULATIONS:
PAGE 68 of 623
The chapters and article set forth below are hereby adopted by reference, subject to amendments thereto as set forth in this chapter. Those amendments shall control in the event of any conflict with adopted codes.
A. Chapter 1 of the 2016 California Building Code.
B. Chapter 1 of the 2016 California Residential Code.
C. Article 89 of the 2016 California Electrical Code.
D. Chapter 1 of the 2016 California Mechanical Code.
E. Chapter 1 of the 2016 California Plumbing Code.
F. Chapter 1 of the 2016 California Fire Code. (Ord. 0-18-1335, 4-11-2018) ARTICLE 02
BUILDING CODE
SECTION:
25.02.01: Building Code Adopted
25.02.02: Amendment Of Section 114.1
25.02.03: Amendment Of Section 113.1
25.02.04: Amendment Of Sections 109.2 And 109.6
25.02.05: Amendment Of Section 110.3.3.1, 110.3.9.1, 110.7
25.02.06: Amendment Of Section 111.1
25.02.07: Amendment Of Section 302.1
25.02.08: Amendment Of Section 312.2
25.02.09: Amendment Of Section 312.3 R317.1
25.02.10: Amendment Of Section 1505.1.1
25.02.11: Amendment Addition Of Section 1505.1.3
25.02.12: Amendment Of Section 1507.2.5.1
25.02.13: Amendment Of Section 1507.3.1
25.02.14: Amendment Of Section 1507.8.5
25.02.15: Amendment Of Section 1507.9.6
25.02.16: Amendment Addition Of Section 1613.51613.8
25.02.17: Amendment Addition Of Section 1613.61613.8
25.02.18: Amendment Addition Of Section 1613.71705.13.2
25.02.19: Amendment Addition Of Section 1613.8
25.02.20: Amendment Of Section 1705.3 And Table 1705.3
25.02.21: Amendment Of Section 1705.132
25.02.22: Amendment Addition Of Section 1710 And 1710.12304.10.4
25.02.23: Amendment Of Section 1807.1.4
25.02.24: Amendment Of Section 1807.1.6
25.02.25: Amendment Of Section 1809.3
25.02.26: Amendment Of Section 1809.7 And Table 1809.7
25.02.27: Amendment Of Section 1809.12
25.02.28: Amendment Of Section 1810.3.2.4
PAGE 69 of 623
25.02.29: Amendment Of Section 1905.1.3
25.02.30: Amendment Of Section 1905.1.8
25.02.31: Amendment Of Section 1905.1 And Addition Of Sections 1905.1.9 And 1905.1.10
25.02.32: Amendment Of Section 2304.10.2
25.02.33: Amendment Of Section 2304.12.2.8
25.02.34: Amendment Of Section 2305.4
25.02.35: Amendment Of Section 2305.5
25.02.36: Amendment Of Section 2306.2
25.02.37: Amendment Of Section 2306.3 And Addition Of Section
25.02.38: Amendment Of Section 2308.3.2
25.02.39: Amendment Of Sections 2308.106.5 And 2308.6.5.1
25.02.40: Amendment Of Table 2308.6.12308.10.1
25.02.41: Amendment Of Section 2308.6.9
25.02.42: Amendment Of Section 3109.2.1
25.02.01: BUILDING CODE ADOPTED:
A. Code Adopted: The California Building Code, 20252 edition, based on the 20241 International Building Code as published by the International Code Council, including all appendices, is hereby adopted by reference, and together with certain amendments and deletions, shall constitute the Building Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained for use and examination by the public.
B. Building Official Defined: For the purpose of this Code, the Planning and Building DirectorCommunity Development Director shall be the Building Official or his or her designee. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.02: AMENDMENT OF SECTION 114.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 114.1 of the Building Code is amended to read as follows:
114.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy, or maintain any building, structure or equipment or cause or permit the same to be done in violation of the Building Code.
It is hereby declared that any violation of the Building Code constitutes a public nuisance, and in addition to any other remedies provided by the Building Code for its enforcement, the City Council may bring civil suit to enjoin the violation of any provisions of this Building Code.
Any person, firm or corporation violating any of the provisions of the Building Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03A of this Code. Each separate day or any portion thereof during which violation of the Building Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
PAGE 70 of 623
25.02.03: AMENDMENT OF SECTION 113.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 113.1 of the Building Code is amended to read as follows:
113.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of this Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council. The Building Official shall be an ex officio member and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedure for conducting its business, and shall render all decisions and findings, in writing, to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Building Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.02.04: AMENDMENT OF SECTIONS 109.2 AND 109.6:
Notwithstanding the provisions of section 25.02.01 of this article, sections 109.2 and 109.6 of the Building Code are amended to read as follows:
109.2 Schedule of permit fees. The fee for each permit shall be as periodically established by City Council resolution.
109.2.1 Plan review fees. When plans or other data are required pursuant Section 107.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be 100 percent of the building permit fee established by resolution of the City Council.
109.2.2 Expiration of plan review. Applications for which no permit is issued within 180 days following the date the application or the date of final approval, if one exists, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days on written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee. 109.2.3 Expiration of building permits. Building permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit.
The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
PAGE 71 of 623
If an applicant wishes to renew a permit that has been expired for less than 6 months, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 6 months, 100% of the original fees paid shall be required to renew the permit.
109.6 Fee refunds. The Building Official may authorize refunding of any fee paid hereunder that was erroneously paid or collected.
The Building Official may authorize the refunding of not more than 80% of the permit fee paid when no work has been done under a permit in accordance with the Building code.
The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee within 60 days of the date of fee payment. (Ord. 0-19-1357, 11-13-2019)
25.02.05: ADDITION OF SECTIONS 110.3.3.1, 110.3.9.1 AND 110.7:
Notwithstanding the provisions of section 25.02.01 of this article, new sections 110.3.3.1, 110.3.9.1, and 110.7 are added to the Building Code to read as follows:
110.3.3.1 Prior to frame approval, a rough zoning inspection is required in order to ensure compliance with the approved Development Plans.
110.3.9.1 Prior to final approval, a final zoning inspection is required in order to ensure final compliance with approved Development Plans.
110.7 Connections prohibited. Unless approval has been first obtained from the Building Official, the connection of gas or electrical utilities shall be prohibited until the final zoning, building, heating, air conditioning, electrical, plumbing and grading inspections, as required, are completed and approval has been granted on any building. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.06: AMENDMENT OF SECTION 111.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 111.1 of the Building Code is amended to read as follows:
111.1 Use or Occupancy. No building or structure shall be used or occupied, and no change in the existing occupancy classification, tenancy, or change in proprietorship of a building or structure or portion thereof shall be made until the Building Official has issued a Certificate of Occupancy therefor as provided herein.
Exception: Group R, Division 3 and Group U occupancies.
Issuance of a Certificate of Occupancy shall not be construed as an approval of a violation of the provisions of the Building Code or of other ordinances of the City. Certificates presuming to give authority to violate or cancel the provisions of the Building Code or other ordinances of the City shall not be valid.
(Ord. 0-19-1357, 11-13-2019)
PAGE 72 of 623
25.02.07: AMENDMENT OF SECTION 302.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 302.1 of the Building Code is amended by adding a new paragraph to read as follows:
Any buildings or structures hereafter erected or constructed on C-l zoned property shall be constructed of one-hour fire resistive construction throughout.
This Section shall apply to:
1. Construction of any new building.
2. Addition, renovation or remodeling of any existing building when the value thereof is more than twenty percent (20%) of the estimated value of the existing building. The value of the proposed addition, renovation or remodeling shall be cumulative of all such renovation or remodeling over five (5) years.
The value of the proposed construction and of the existing building shall be determined by the Planning and Building Department based upon the latest edition of the Building Valuation Data as published by the International Code Council.
(Ord. 0-19-1357, 11-13-2019)
25.02.08: ADDITION OF SECTION 312.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 312.2 is added to the Building Code to read as follows:
312.2 Garage access. To provide a secondary means of egress from a private garage, a door, minimum 2'6" x 6'8" dimensions, shall be provided in addition to the automobile access door or doors.
(Ord. 0-19-1357, 11-13-2019)
25.02.09: ADDITION AMENDMENT OF SECTION 312.3 R317.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 312.3 317.1is added to the Building Code to read as follows:
312.3 Garage floor surfaces. In areas where motor vehicles are stored or operated, floor surface shall be concrete, and shall be a minimum 3-1/2 inches thick. No other floor coverings are permitted.
R317.1 Floor surface. Garage floor surfaces shall be of approved noncombustible material.
The area of floor used for parking of automobiles or other vehicles shall be sloped to facilitate the movement of liquids to a drain or toward the main vehicle entry doorway. Combustible Finished Flooring shall be prohibited. (Underlined will be our amendment to the code). (Ord. 0-19-1357, 11-13-2019)
25.02.10: AMENDMENT OF SECTION 1505.1.1:
PAGE 73 of 623
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1505.1.1 of the Building Code is amended by adding new paragraphs following the first sentence to read as follows:
1505.1.1 Roof CoveringsAssembly. Wood shakes and wood shingles for reroofing or repairs to an existing roof, or new construction of a roof are permitted provided they are Class A fire retardant roofing coverings.
Exception: Repairs to existing wood shake or wood shingle roof covering, which are considered minor (up to five percent (5%) of the roof area), may be allowed with Class B wood shingles or shakes.
Notwithstanding Section 1507.8.5, when more than thirty percent (30%) of the total roof area is replaced within any one (1) year period, the entire roof covering of every new structure and any roof covering applied in the alteration, repair or replacement of the roof of the existing structure shall be a fire-retardant roof covering that is at least Class A.
Reroofing over an existing Organic roof is not permitted unless the roofing is specifically approved in the classification required over existing substrate. Evidence of such approval must be submitted at the time of permit issuance. Fire severity zones are established by the Fire Department and the California Department of Forestry and Fire Protection. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.11: AMENDMENT ADDITION OF SECTION 1505.1.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1505.1.3 of the Building Code is amended by requiring minimum Class "BA" roofing for all types of construction for Group A-3, B, M and R-3 Occupancies.
(Ord. 0-19-1357, 11-13-2019)
25.02.12: ADDITION OF SECTION 1507.2.5.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 1507.2.5.1 is added to the Building Code to read as follows:
1507.2.5.1 Not more than one overlay of asphalt shingles shall be applied over an existing asphalt or wood shingle roof. Asphalt shingles applied over wood shingles shall not have less than Type 30 nonperforated felt underlayment installed prior to reroofing. (Ord. 0-19-1357, 11-13-2019)
25.02.13: AMENDMENT OF SECTION 1507.3.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 1507.3.1 of the Building Code is amended to read as follows:
1507.3.1 Deck requirements. Concrete and clay tile shall be installed only over solid structural sheathing boards.
(Ord. 0-19-1357, 11-13-2019)
PAGE 74 of 623
25.02.14: AMENDMENT OF SECTION 1507.8.5:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1507.8.5 of the Building Code is amended as follows:
Wood shingles shall be of naturally durable wood and comply with the requirements of Table 1507.8.5. If reroofing more than thirty percent (30%) of an existing roof within any one (1) year period, then the entire roof must comply with the current code. This means that all existing wood shingles must be removed and the new roof must be a code approved Class A roof covering as required by CBC Section 1505.1. If reroofing thirty percent (30%) or less of an existing roof within any one (1) year period, then only the area replaced needs to comply with the current code. This means that only the wood shingles in the area of replacement must be removed and the new roof material must be a code approved Class A roof covering as required by CBC Section 1505.1. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.15: AMENDMENT OF SECTION 1507.9.6:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1507.9.6 of the Building Code is amended as follows:
Wood shake shall comply with the requirements of Table 1507.9.6. If reroofing more than thirty percent (30%) of an existing roof within any one (1) year period, then the entire roof must comply with the current code. This means that all existing wood shakes must be removed and the new roof must be a code approved Class A roof covering as required by CBC Section 1505.1.
If reroofing thirty percent (30%) or less of an existing roof within any one (1) year period, then only the area replaced needs to comply with current code. This means that only the wood shake in the area of replacement must be removed and the new roof material must be a code approved Class A roof covering as required by CBC Section 1505.1."
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.16: AMENDMENT ADDITION OF SECTION 1613.5 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.5 is added to chapter 16 of the 2019 Edition of the California Building Code to read as follows:
1613.5 ASCE 7, 12.12.3 Modify ASCE 7 Equation 12.12-1 of Section 12.12.3 to read as follows:
(12 .12-1)
(Ord. 0-19-1357, 11-13-2019)
25.02.17: AMENDMENT ADDITION OF SECTION 1613.6 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.6 1613.8 is added to chapter 16 of the 2019 Edition of the California Building Code to read as follows:
PAGE 75 of 623
1613.6 1613.8 ASCE 7, 12.2.3.1, Exception 3. Modify ASCE 7 Section 12.2.3.1 Exception 3 to read as follows:
3. Detached one- and two-family dwellings up to two stories in height of light frame construction.
(Ord. 0-19-1357, 11-13-2019)
25.02.18: AMENDMENT ADDITION OF SECTION 1613.7 1705.13.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.7 is added to the Building Code to read as follows:
1613.7 1705.13.2 ASCE 7, Section 12.11.2.2.3. Modify ASCE 7, Section 12.11.2.2.3 to read as follows:
12.11.2.2.3 Wood Diaphragms. In wood diaphragms, the continuous ties shall be in addition to the diaphragm sheathing. Anchorage shall not be accomplished by use of toe nails or nails subject to withdrawal nor shall wood ledgers or framing be used in cross-grain bending or cross-grain tension. The diaphragm sheathing shall not be considered effective as providing ties or struts required by this section.
For structures assigned to Seismic Design Category D, E or F, wood diaphragms supporting concrete or masonry walls shall comply with the following:
1. The spacing of continuous ties shall not exceed 40 feet. Added chords of diaphragms may be used to form subdiaphragms to transmit the anchorage forces to the main continuous crossties.
2. The maximum diaphragm shear used to determine the depth of the subdiaphragm shall not exceed 75% of the maximum diaphragm shear.
(Ord. 0-19-1357, 11-13-2019)
25.02.19: ADDITIONAMENDMENT OF SECTION 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.8 is added to the Building Code to read as follows:
1613.8 Suspended Ceilings. Minimum design and installation standards for suspended ceilings shall be determined in accordance with the requirements of Section 2506.2.1 of this Code and this section.
1613.8.1 Scope. This part contains special requirements for suspended ceilings and lighting systems. Provisions of Section 13.5.6 of ASCE 7-10 shall apply except as modified herein. 1613.8.2 General. The suspended ceilings and lighting systems shall be limited to 6 feet (1828 mm) below the structural deck unless the lateral bracing is designed by a licensed engineer or architect.
1613.8.3 Sprinkler Heads. All sprinkler heads (drops) except fire-resistance-rated floor/ceiling or roof/ceiling assemblies, shall be designed to allow for free movement of the sprinkler pipes with oversize rings, sleeves or adaptors through the ceiling tile. Sprinkler heads and other penetrations PAGE 76 of 623
shall have a 2 in. (50mm) oversize ring, sleeve, or adapter through the ceiling tile to allow for free movement of at least 1 in. (25mm) in all horizontal directions. Alternatively, a swing joint that can accommodate 1 in. (25 mm) of ceiling movement in all horizontal directions is permitted to be provided at the top of the sprinkler head extension.
Sprinkler heads penetrating fire-resistance-rated floor/ceiling or roof/ceiling assemblies shall comply with Section 714 of this Code.
1613.8.4 Special Requirements for Means of Egress. Suspended ceiling assemblies located along means of egress serving an occupant load of 30 or more shall comply with the following provisions.
1613.8.4.1 General. Ceiling suspension systems shall be connected and braced with vertical hangers attached directly to the structural deck along the means of egress serving an occupant load of 30 or more and at lobbies accessory to Group A Occupancies. Spacing of vertical hangers shall not exceed 2 feet (610 mm) on center along the entire length of the suspended ceiling assembly located along the means of egress or at the lobby.
1613.8.4.2 Assembly Device. All lay-in panels shall be secured to the suspension ceiling assembly with two hold-down clips minimum for each tile within a 4-foot (1219 mm) radius of the exit lights and exit signs.
1613.8.4.3 Emergency Systems. Independent supports and braces shall be provided for light fixtures required for exit illumination. Power supply for exit illumination shall comply with the requirements of Section 1006.3 of this Code.
1613.8.4.4 Supports for Appendage. Separate support from the structural deck shall be provided for all appendages such as light fixtures, air diffusers, exit signs, and similar elements. (Ord. 0-19-1357, 11-13-2019)
25.02.20: AMENDMENT OF SECTIONS 1705.3 AND TABLE 1705.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1705.3 and table 1705.3 of the Building Code are amended to read as follows:
1705.3 Concrete Construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1705.3.
Exceptions: Special inspection shall not be required for:
Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock, where the structural design of the footing is based on a specified compressive strength, f c, no greater than 2,500 pounds per square inch (psi) (17.2 Mpa) regardless of the compressive strength specified in the construction documents or used in the footing construction.
2. Continuous concrete footings supporting walls of buildings three stories or less in height that are fully supported on earth or rock where:
2.1. The footings support walls of light-frame construction; PAGE 77 of 623
2.2. The footings are designed in accordance with Table 1805.4.2; or
2.3. The structural design of the footing is based on a specified compressive strength, f c, no greater than 2,500 pounds per square inch (psi) (17.2 Mpa), regardless of the compressive strength specified in the construction documents or used in the footing construction.
3. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa).
4. Concrete patios, driveways and sidewalks, on grade.
PAGE 78 of 623
TABLE 1705.3
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION PAGE 79 of 623
For SI: 1 inch = 25.4 mm.
a. Where applicable, see Section 1705.13.
b. Specific requirements for special inspection shall be included in the research report for the anchor issued by an approved source in accordance with 26.13 in ACI 318, or other qualification procedures. Where specific requirements are not provided, special instruction requirements shall be specified by the registered design professional and shall be approved by the building official prior to the commencement of the work. c. [OSHPD 1R, 2 & 5] Installation of all adhesive anchors in horizontal and upwardly inclined positions shall be performed by an ACI/CRSI Certified Adhesive Anchor Installer, except where the factored design tension on the anchor is less than 100 pounds and those anchors are clearly noted on the approved construction documents or where the anchors are shear dowels across cold joints in slabs on grade where the slab is not part of the lateral force-resisting system.
(Ord. 0-19-1357, 11-13-2019)
25.02.21: AMENDMENT OF SECTION 1705.123:
Notwithstanding the provisions of section 25.02.01 of this article, section 1705.13 of the Building Code is amended to read as follows:
1705.13 Special inspections for seismic resistance. Special inspections itemized in Sections 1705.13.1 through 1705.13.9, unless exempted by the exceptions of Section 1704.2, are required for the following:
1. The seismic force-resisting systems in structures assigned to Seismic Design Category C, D, E or F in accordance with Sections 1705.13.1.1 through 1705.13.1.2, as applicable.
2. Designated seismic systems in structures assigned to Seismic Design Category C, D, E or F in accordance with Section 1705.13.4.
3. Architectural, mechanical and electrical components in accordance with Sections 1705.13.5.
4. Storage racks in structures assigned to Seismic Design Category D, E or F in accordance with Section 1705.13.7.
5. Seismic isolation systems in accordance with Section 1705.13.8.
Exception: Special inspections itemized in Sections 1705.13.1 through 1705.13.9 are not required for structures designed and constructed in accordance with one of the following:
1. The structure consists of light-frame construction; the design spectral response acceleration at short periods, SDS, as determined in Section 1613.2.4, does not exceed 0.5; and the building height of the structure does not exceed 35 feet (10 668 mm).
2. The seismic force-resisting system of the structure consists of reinforced masonry or reinforced concrete; the design spectral response acceleration at short periods, SDS, as determined in Section 1613.2.4, does not exceed 0.5; and the building height of the structure does not exceed 25 feet (7620 mm).
PAGE 80 of 623
3. The structure is a detached one- or two-family dwelling not exceeding two stories above grade plane, is not assigned to Seismic Design Category D, E or F and does not have any of the following horizontal or vertical irregularities in accordance with Section 12.3 of ASCE 7:
3.1 Torsional or extreme torsional irregularity.
3.2 Nonparallel systems irregularity.
3.3 Stiffness-soft story or stiffness-extreme soft story irregularity.
3.4 Discontinuity in lateral strength-weak story irregularity. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.22: ADDITION OF SECTIONS 1710 AND 1710.1 2304.10.4:
Notwithstanding the provisions of section 25.02.01 of this article, sections 1710 and 1710.1 2304.10.4 are added to, and chapter 35 of the Building Code is amended, to read as follows:
1710 General. The vertical load-bearing capacity, torsional moment capacity and deflection characteristics of joist hangers shall be determined in accordance with ASTM D 1761 and ASTM D 7147 as specified below using lumber having a specific gravity of 0.49 or greater, but not greater than 0.55, as determined in accordance with AF&PA AWC NDS for the joist and headers.
Exception: The joist length shall not be required to exceed 24 inches (610 mm). 1710.1 2304.10.4.1 Vertical load capacity for joist hangers. The vertical load-bearing capacity for the joist hanger shall be determined by testing a minimum of three joist hanger assemblies as specified in ASTM D 1761 or ASTM D 7147. If the ultimate vertical load for any one of the tests varies more than 20 percent from the average ultimate vertical load, at least three additional tests shall be conducted. The allowable vertical load-bearing of the joist hanger shall be the lowest value determined from the following:
1. The lowest ultimate vertical load for a single hanger from any test divided by three (where three tests are conducted and each ultimate vertical load does not vary more than 20 percent from the average ultimate vertical load).
2. The average ultimate vertical load for a single hanger from all tests divided by three (where six or more tests are conducted).
3. The average from all tests of the vertical loads that produce a vertical movement of the joist with respect to the header of 1/8 inch (3.2 mm).
4. The sum of the allowable design loads for nails or other fasteners utilized to secure the joist hanger to the wood members and allowable bearing loads that contribute to the capacity of the hanger.
5. The allowable design load for the wood members forming the connection.
Amend the Reference Standards in Chapter 35 for ASTM as follows:
PAGE 81 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.23: AMENDMENT OF SECTION 1807.1.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 1807.1.4 of the Building Code is amended to read as follows:
1807.1.4 Permanent wood foundation systems. Permanent wood foundation systems shall be designed and installed in accordance with AF&PA PWF. Lumber and plywood shall be treated in accordance with AWPA Ul (Commodity Specification A, Use Category 4B and Section 5.2) and shall be identified in accordance with Section 2303.1.89.1. Permanent wood foundation systems shall not be used for structures assigned to Seismic Design Category D, E or F. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.24: AMENDMENT OF SECTION 1807.1.6:
Notwithstanding the provisions of section 25.02.01 of this article, section 1807.1.6 of the Building Code is amended to read as follows:
1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and masonry foundation walls that are laterally supported at the top and bottom shall be permitted to be designed and constructed in accordance with this section. Prescriptive design of foundation walls shall not be used for structures assigned to Seismic Design Category D, E or F. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.25: AMENDMENT OF SECTION 1809.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.3 of the Building Code is amended to read as follows:
1809.3 Stepped footings. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).
PAGE 82 of 623
For structures assigned to Seismic Design Category D, E or F, the stepping requirement shall also apply to the top surface of grade beams supporting walls. Footings shall be reinforced with four No. 4 rebar. Two bars shall be place at the top and bottom of the footings as shown in Figure 1809.3.
FIGURE 1809.3
STEPPED FOOTING
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.26: AMENDMENT OF SECTION 1809.7 AND TABLE 1809.7:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.7 and table 1809.7 of the Building Code are amended to read as follows:
1809.7 Prescriptive footings for light-frame construction. Where a specific design is not provided, concrete or masonry-unit footings supporting walls of light-frame construction shall be permitted to be designed in accordance with Table 1809.7. Prescriptive footings in Table 1809.7 shall not exceed one story above grade plane for structures assigned to Seismic Design Category D, E or F.
PAGE 83 of 623
TABLE 1809.7
PRESCRIPTIVE FOOTINGS SUPPORTING WALLS OF LIGHT-FRAME
CONSTRUCTION a, b, c, d, e
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm
a. Depth of footings shall be in accordance with Section 1809.4. b. The ground under the floor shall be permitted to be excavated to the elevation of the top of the footing.
c. Not Adopted.
d. See Section 1908 for additional requirements for concrete footings of structures assigned to Seismic Design Category C, D, E or F.
e. For thickness of foundation walls, see Section 1807.1.6. f. Footings shall be permitted to support a roof addition to the stipulated number of floors.
Footings supporting roof only shall be as required for supporting one floor. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.27: AMENDMENT OF SECTION 1809.12:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.12 of the Building Code is amended to read as follows:
1809.12 Timber footings. Timber footings shall be permitted for buildings of Type V construction and as otherwise approved by the building official. Such footings shall be treated in accordance with AWPA Ul (Commodity Specification A, Use Category 4B). Treated timbers are not required where placed entirely below permanent water level, or where used as capping for wood piles that project above the water level over submerged or marsh lands. The compressive stresses perpendicular to grain in untreated timber footing supported upon treated piles shall not exceed 70 percent of the allowable stresses for the species and grade of timber as specified in the AF&PA NDS. Timber footings shall not be used in structures assigned to Seismic Design Category D, E or F.
PAGE 84 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.28: AMENDMENT OF SECTION 1810.3.2.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 1810.3.2.4 of the Building Code is amended to read as follows:
1810.3.2.4 Timber. Timber deep foundation elements shall be designed as piles or poles in accordance with AF&PA NDS. Round timber elements shall conform to ASTM D 25. Sawn timber elements shall conform to DOC PS-20. Timber shall not be used in structures assigned to Seismic Design Category D, E or F.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.29: AMENDMENT OF SECTION 1905.1.3
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1.3 of the Building Code is amended to read as follows:
1905.1.3 ACI 318, Section 18.5. Modify ACI 318, Section 18.5, by renumbering Section 18.5.2.2 to become new Sections 18.5.2.2, 18.5.2.3, 18.5.2.4 and 18.5.2.5 to read as follows:
18.5.2.2 - Connections that are designed to yield shall be capable of maintaining 80 percent of their design strength at the deformation induced by the design displacement or shall use Type 2 mechanical splices.
18.5.2.3 - Elements of the connection that are not designed to yield shall develop at least 1.5 Sy.
18.5.2.4 - In structures assigned to Seismic Design Category D, E or F, intermediate precast wall panels and wall piers shall be designed in accordance with Section 21.9 or 21.13.
18.5.2.5 - Wall piers not designed as part of a moment frame in buildings assigned to Seismic Design Category C shall have transverse reinforcement designed to resist the shear forces determined from 21.3.3. Spacing of transverse reinforcement shall not exceed 8 inches (203 mm).
Transverse reinforcement shall be extended beyond the pier clear height for at least 12 inches (305 mm).
Exceptions:
1. Wall piers that satisfy 18.10.8 or 18.14.
2. Wall piers along a wall line within a story where other shear wall segments provide lateral support to the wall piers and such segments have a total stiffness of at least six times the sum of the stiffnesses of all the wall piers.
18.5.2.6 - Wall segments with a horizontal length-to-thickness ratio less than 2.5 shall be designed as columns.
(Ord. 0-19-1357, 11-13-2019)
25.02.30: AMENDMENT OF SECTION 1905.1.8:
PAGE 85 of 623
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1.7 of the Building Code is amended to read as follows:
1905.1.7 ACI 318, Section 14.1.4. Delete ACI 318, Section 14.1.4, and replace with the following:
14.1.1 - Plain concrete in structures assigned to Seismic Design Category C, D, E or F.
14.1.4.1 - Structures assigned to Seismic Design Category C, D, E or F shall not have elements of structural plain concrete, except as follows:
(a) Concrete used for fill with a minimum cement content of two (2) sacks of Portland cement or cementious material per cubic yard.
(b) Isolated footings of plain concrete supporting pedestals or columns are permitted, provided the projection of the footing beyond the face of the supported member does not exceed the footing thickness.
(c) Plain concrete footings supporting walls are permitted provided the footings have at least two continuous longitudinal reinforcing bars. Bars shall not be smaller than No. 4 and shall have a total area of not less than 0.002 times the gross cross-sectional area of the footing. A minimum of one bar shall be provided at the top and bottom of the footing. Continuity of reinforcement shall be provided at corners and intersections.
In detached one- and two-family dwellings three stories or less in height and constructed with stud-bearing walls, are permitted to have plain concrete footings with at least two continuous longitudinal reinforcing bars not smaller than No. 4 are permitted to have a total area of less than
0.002 times the gross cross-sectional area of the footing. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.31: AMENDMENT OF SECTION 1905.1 AND ADDITION OF SECTIONS 1905.1.9 AND 1905.1.10:
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1 is amended and sections 1905.1.9 and 1905.1.10 are added to the Building Code to read as follows:
1905.1 General. The text of ACI 318 shall be modified as indicated in Sections 1905.1 through 1905.1.8
1905.1.9 ACI 318, Section 21.6.4. Modify ACI 318, Section 21.6.4, by adding Section 21.6.4.8 and 12.6.4.9 as follows:
21.6.4.8 Where the calculated point of contraflexure is not within the middle half of the member clear height, provide transverse reinforcement as specified in ACI 318 Sections 21.6.4.1, Items (a) through (c), over the full height of the member.
21.6.4.9 - At any section where the design strength, Pn, of the column is less than the sum of the shears Ve computed in accordance with ACI 318 Sections 21.5.4.1 and 21.6.5.1 for all the beams framing into the column above the level under consideration, transverse reinforcement as specified in ACI 318 Sections 21.6.4.1 through 21.6.4.3 shall be provided. For beams framing into PAGE 86 of 623
opposite sides of the column, the moment components are permitted to be assumed to be of opposite sign. For the determination of the design strength, Pn, of the column, these moments are permitted to be assumed to result from the deformation of the frame in any one principal axis. 1905.1.10 ACI 318, Section 21.9.4. Modify ACI 318, Section 21.9.4, by adding Section 21.9.4.6 as follows:
21.9.4.6 - Walls and portions of walls with Pu > 0.35Po shall not be considered to contribute to the calculated shear strength of the structure for resisting earthquake-induced forces. Such walls shall conform to the requirements of ACI 318 Section 21.13. (Ord. 0-19-1357, 11-13-2019)
25.02.32: AMENDMENT OF SECTION 2304.10.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2304.10.1 of the Building Code is amended to read as follows:
2304.10.2 Fastener requirements. Connections for wood members shall be designed in accordance with the appropriate methodology in Section 2302.1. The number and size of fasteners connecting wood members shall not be less than that set forth in Table 2304.10.2. Staple fasteners in Table 2304.10.2 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.
Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the building official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.33: AMENDMENT OF SECTION 2304.12.2.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 2304.12.5 of the Building Code is amended to read as follows:
2304.12.2.8 Wood used in retaining walls and cribs. Wood installed in retaining or crib walls shall be preservative treated in accordance with AWPA Ul (Commodity Specifications A or F) for soil and fresh water use. Wood shall not be used in retaining or crib walls for structures assigned to Seismic Design Category D, E or F.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.34: ADDITION OF SECTION 2305.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 2305.4 is added to the Building Code to read as follows:
2305.4 Quality of Nails. I23n Seismic Design Category D, E or F, mechanically driven nails used in wood structural panel shear walls shall meet the same dimensions as that required for handdriven nails, including diameter, minimum length and minimum head diameter. Clipped head or box nails are not permitted in new construction. The allowable design value for clipped head nails in existing construction may be taken at no more than the nail-head-area ratio of that of the same size hand-driven nails.
PAGE 87 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.35: ADDITION OF SECTION 2305.5:
Notwithstanding the provisions of section 25.02.01 of this article, section 2305.5 is added to the Building Code to read as follows:
2305.5 Hold-down connectors. In Seismic Design Category D, E or F, hold-down connectors shall be designed to resist shear wall overturning moments using approved cyclic load values or 75 percent of the allowable seismic load values that do not consider cyclic loading of the product.
Connector bolts into wood framing shall require steel plate washers on the post on the opposite side of the anchorage device. Plate size shall be a minimum of 0.229 inch by 3 inches by 3 inches (5.82 mm by 76 mm by 76 mm) in size. Hold-down connectors shall be tightened to finger tight plus one half (1/2) wrench turn just prior to covering the wall framing. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.36: AMENDMENT OF SECTION 2306.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2306.2 of the Building Code is amended to read as follows:
2306.2 Wood-frame diaphragms. Wood-frame diaphragms shall be designed and constructed in accordance with AWCF&PA SDPWS. Where panels are fastened to framing members with staples, requirements and limitations of AF&PA SDPWS shall be met and the allowable shear values set forth in Table 2306.2(1) or 2306.2(2) shall only be permitted for structures assigned to Seismic Design Category A, B, or C.
Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the building official.
The allowable shear values in Tables 2306.2(1) and 2306.2(2) are permitted to be increased 40 percent for wind design.
Exception: [DSA-SS, DSA-SS/CC and OSHPD 1, 2 &4] Wood structural panel diaphragms using staples as fasteners are not permitted by DSA and OSHPD.
Wood structural panel diaphragms used to resist seismic forces in structures assigned to Seismic Design Category D, E or F shall be applied directly to the framing members.
Exception: Wood structural panel diaphragms are permitted to be fastened over solid lumber planking or laminated decking, provided the panel joints and lumber planking or laminated decking joints do not coincide.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.37: AMENDMENT OF SECTION 2306.3 AND ADDITION OF SECTION 2307.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2306.3 is amended and section 2307.2 is added to the Building Code to read as follows:
PAGE 88 of 623
2306.3 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with AF&PA AWC SDPWS. For structures assigned to Seismic Design Category D, E, or F, application of Tables 4.3A and 4.3B of AF&PA SDPWS shall include the following:
1. Wood structural panel thickness for shear walls shall not be less than 3/8 inch thick and studs shall not be spaced at more than 16 inches on center.
2. The maximum nominal unit shear capacities for 3/8 inch wood structural panels resisting seismic forces in structures assigned to Seismic Design Category D, E or F is 400 pounds per linear foot (plf).
Exception: Other nominal unit shear capacities may be permitted if such values are substantiated by cyclic testing and approved by the building official.
3. Where shear design values using allow stress design (ASD) exceed 350 plf or load and resistance factor design (LRFD) exceed 500 plf, all framing members receiving edge nailing from abutting panels shall not be less than a single 3-inch nominal member, or two 2-inch nominal members fastened together in accordance with Section 2306.1 to transfer the design shear value between framing members. Wood structural panel joint and sill plate nailing shall be staggered at all panel edges. See Section 4.3.6.1 and 4.3.6.4.3 of AF&PA SDPWS for sill plate size and anchorage requirements.
4. Nails shall be placed not less than 1/2 inch in from the panel edges and not less than 3/8 inch from the edge of the connecting members for shear greater than 350 plf using ASD or 500 plf using LRFD. Nails shall be placed not less than 3/8 inch from panel edges and not less than 1/4 inch from the edge of the connecting members for shears of 350 plf or less using ASD or 500 plf or less using LRFD.
5. Table 4.3B application is not allowed for structures assigned to Seismic Design Category D, E, or F.
For structures assigned to Seismic Design Category D, application of Table 4.3C of AF&PA SDPWS shall not be used below the top level in a multi-level building for structures.
Where panels are fastened to framing members with staples, requirements and limitations of AF&PA SDPWS shall be met and the allowable shear values set forth in Table 2306.3(1), 2306.3(2) or 2306.3(3) shall only be permitted for structures assigned to Seismic Design Category A, B, or C.
Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the building official.
The allowable shear values in Tables 2306.3(1) and 2306.3(2) are permitted to be increased 40 percent for wind design. Panels complying with ANSI/APA PRP-210 shall be permitted to use design values for Plywood Siding in the AF&PA SDPWS.
Exception: [DSA-SS 7DSA-SS/CC and OSHPD 1, 2 &4] Wood structural panel shear walls using staples as fasteners are not permitted by DSA and OSHPD. 23067.32 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with Section 2306.3 as applicable.
PAGE 89 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.38: ADDITION OF SECTION 2308.3.2:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 2308.3.2 is added to the Building Code to read as follows:
2308.3.2 Braced wall line support. Braced wall lines shall be supported by continuous foundations.
Exception: For structures with a maximum plan dimension not over 50 feet (15240 mm), continuous foundations are required at exterior walls only for structures assigned to Seismic Design Category A, B, or C.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.39: AMENDMENT OF SECTIONS 2308.106.5 AND 2308.6.5.1:
Notwithstanding the provisions of section 25.02.01 of this article, sections 2308.6.5 and 2308.6.5.1, of the Building Code are amended to read as follows:
2308.6.5 Alternative bracing. Any bracing required by Section 2308.6.5 is permitted to be replaced by the following:
1. In one-story buildings, each panel shall have a length of not less than 2 feet 8 inches (813 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with 3/8-inch-minimum-thickness (9.5 mm) wood structural panel sheathing nailed with 8d common or galvanized box nails in accordance with Table 2304.10.1 and blocked at wood structural panel edges. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inch-minimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports. Two anchor bolts installed in accordance with Section 2308.3.1 shall be provided in each panel. Anchor bolts shall be placed at each panel outside quarter points. Each panel end stud shall have a tie-down device fastened to the foundation, capable of providing an approved uplift capacity of not less than 1,800 pounds (8006 N). The tie-down device shall be installed in accordance with the manufacturer's recommendations. The panels shall be supported directly on a foundation or on floor framing supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom.
Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned down slab edge is permitted at door openings in the braced wall line. This continuous footing or turned down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped 15 inches (381 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.
2. In the first story of two-story buildings, each wall panel shall be braced in accordance with Section 2308.6.5.1, Item 1, except that the wood
PAGE 90 of 623
structural panel sheathing shall be provided on both faces, three anchor bolts shall be placed at one-quarter points, and tie-down device uplift capacity shall not be less than 3,000 pounds (13 344 N).
2308.610.5.1 Alternate bracing wall panel adjacent to a door or window opening. Any bracing required by Section 2308.6.5 is permitted to be replaced by the following when used adjacent to a door or window opening with a full-length header:
1. In one-story buildings, each panel shall have a length of not less than 16 inches (406 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with a single layer of 3/8 inch (9.5 mm) minimum thickness wood structural panel sheathing nailed with 8d common or galvanized box nails in accordance with Figure 2308.6.1. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inchminimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports and in accordance with Figure 2308.9.3.2. The wood structural panel sheathing shall extend up over the solid sawn or gluedlaminated header and shall be nailed in accordance with Figure 2308.8.3.1. A built-up header consisting of at least two 2 x 12s and fastened in accordance with Item 24 of Table 2304.9.1 shall be permitted to be used. A spacer, if used, shall be placed on the side of the built-up beam opposite the wood structural panel sheathing. The header shall extend between the inside faces of the first full-length outer studs of each panel. The clear span of the header between the inner studs of each panel shall be not less than 6 feet (1829 mm) and not more than 18 feet (5486 mm) in length. A strap with an uplift capacity of not less than 1,000 pounds (4,400 N) shall fasten the header to the inner studs opposite the sheathing. One anchor bolt not less than 5/8 inch (15.9 mm) diameter and installed in accordance with Section 2308.6 shall be provided in the center of each sill plate. The studs at each end of the panel shall have a tie-down device fastened to the foundation with an uplift capacity of not less than 4,200 pounds (18 480 N).
Where a panel is located on one side of the opening, the header shall extend between the inside face of the first full-length stud of the panel and the bearing studs at the other end of the opening.
A strap with an uplift capacity of not less than 1,000 pounds (4400 N) shall fasten the header to the bearing studs. The bearing studs shall also have a tie-down device fastened to the foundation with an uplift capacity of not less than 1,000 pounds (4400 N).
The tie-down devices shall be an embedded strap type, installed in accordance with the manufacturer's recommendations. The panels shall be supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom.
Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned down slab edge is permitted at door openings in the braced wall line. This continuous footing or turned down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped not less than 15 inches (381 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.
2. In the first story of two-story buildings, each wall panel shall be braced in accordance with Item 1 above, except that each panel shall have a length of not less than 24 inches (610 mm).
PAGE 91 of 623
(Ord. 0-19-1357, 11-13-2019)
25.02.40: AMENDMENT OF TABLE 2308.6.1 2308.10.1:
Notwithstanding the provisions of section 25.02.01 of this article, table 2308.6.1 of the Building Code is amended to read as follows:
TABLE 2308.6.1 2308.10.1
WALL BRACING IN SEISMIC DESIGN CATEGORIES D AND E
(Minimum Percentage of Wall Bracing per each Braced Wall Linea) For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
a. Minimum length of panel bracing of one face of the wall for S-W sheathing shall be at least 4'-0" long or both faces of the wall for G-P sheathing shall be at least 8'-0" long; h/w ratio shall not exceed 2:1. For S-W panel bracing of the same material on two faces of the wall, the minimum length is permitted to be one-half the tabulated value but the h/w ratio shall not exceed 2:1 and design for uplift is required. The 2:1 h/w ratio limitation does not apply to alternate braced wall panels constructed in accordance with Section 2308.9.3.1 or 2308.9.3.2 2308.10.2. Wall framing to which sheathing used for bracing is applied shall be nominal 2 inch wide [actual 11/2 inch (38 mm)] or larger members and spaced a maximum of 16 inches on center. Braced wall panel construction types shall not be mixed within a braced wall line. b. G-P = gypsum board, portland cement plaster or gypsum sheathing boards; S-W = wood structural panels;
c. Nailing as specified below shall occur at all pane! edges at studs, at top and bottom plates and, where occurring, at blocking:
For 1/2-inch gypsum board, 5d (0.113 inch diameter) cooler nails at 7 inches on center; For 5/8- inch gypsum board, No. 11 gage (0.120 inch diameter) cooler nails at 7 inches on center; For gypsum sheathing board, 1-3/4 inches long by 7/16-inch head, diamond point galvanized nails at 4 inches on center;
For gypsum lath, No. 13 gage (0.092 inch) by 1-1/8 inches long, 19/64-inch head, plasterboard at 5 inches on center;
For Portland cement plaster, No. 11 gage (0.120 inch) by 11/2 inches long, 7/16- inch head at 6 inches on center;
d. S-W sheathing shall be a minimum of 15/32" thick nailed with 8d common placed 3/8 inches from panel edges and spaced not more than 6 inches on center and 12 inches on center along intermediate framing members.
PAGE 92 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.41: AMENDMENT OF SECTION 2308.6.9:
Notwithstanding the provisions of section 25.02.01 of this article, section 2308.6.9 of the Building Code is amended to read as follows:
2308.106.9 Attachment of sheathing. Fastening of braced wall panel sheathing shall not be less than that prescribed in Table 2308.6.1 and 2304.10.1. Wall sheathing shall not be attached to framing members by adhesives. Staple fasteners in Table 2304.10.1 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.
Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the building official.
All braced wall panels shall extend to the roof sheathing and shall be attached to parallel roof rafters or blocking above with framing clips (18 gauge minimum) spaced at maximum 24 inches (6096 mm) on center with four 8d nails per leg (total eight 8d nails per clip). Braced wall panels shall be laterally braced at each top corner and at maximum 24 inches (6096 mm) intervals along the top plate of discontinuous vertical framing.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.42: ADDITION OF SECTION 3109.2.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 3109.2.1 is added to the Building Code to read as follows:
31109.2.1 Driveway Gates. Driveway gates serving as part of the required pool barrier shall comply with the following:
1. Driveway gates, if operated manually, shall have a spring-loaded, self-closing, self-latching mechanism installed in accordance with the same procedure required in the City Building Code for pedestrian gates.
2. Driveway gates may be equipped with an electric gate-operating device provided that it is approved by a recognized Electrical Testing Agency and contain a battery backup system.
3. Electric gate-operating devices shall be provided with a safety mechanism to interrupt and recycle the device, should the gate become blocked.
4. Electric gate-operating devices shall be provided with a time delay closing device, which is set and maintained to activate a maximum of 30 seconds after the gate has been opened. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 3. New Article 03 Residential Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
PAGE 93 of 623
ARTICLE 03
RESIDENTIAL CODE
SECTION:
25.03.01: Residential Code Adopted
25.03.02: Amendment Of Section R112.1
25.03.03: Addition Of Section R113.1
25.03.04: Amendment Of Sections R108.2 And R108.5
25.03.05: Addition of Sections R109.1.5.4, R109.1.5.5, And R109.1.6.3
25.03.06: Amendment Of Table R301.2.2.1.1 And Section R301.2.2.1.2
25.03.07: Amendment Of Section R301.2.2.6
25.03.08: Addition of Section R301.2.2.11
25.03.09: Addition of Section R337.1
25.03.0910: Amendment Of Section R401.1
25.03.101: Amendment Of Sections R403.1.2, R403.1.3 And R403.1.5
25.03.112: Amendment Of Section R404.2
25.03.123: Amendment Of Section R501.1
25.03.134: Amendment Of Section R503.2.4
25.03.145: Amendment Of Table R602.3(1)
25.03.156: Amendment Of Table R602.3(2)
25.03.167: Amendment Of Table R602.10.3(3)
25.03.178: Amendment Of Table R602.10.4
25.03.189: Amendment Of Figure R602.10.6.1
25.03.2019: Amendment Of Figure R602.10.6.2
25.03.201: Amendment Of Table R602.10.5
25.03.212: Amendment Of Section R602.10.2.3
25.03.223: Amendment Of Section R606.4.4
25.03.234: Amendment Of Section R606.12.2.2.3
25.03.245: Amendment Of Section R602.3.2
25.03.256: Amendment Of Section R803.2.4
25.03.267: Amendment Of Section R1001.3.1
25.03.01: RESIDENTIAL CODE ADOPTED:
Except as hereinafter provided, the California Residential Code, 20252 edition, based on the 20241 International Residential Code as published by the International Code Council, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Residential Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained for use and examination by the public. For the purposes of this code, the Building Official shall be the Building Official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.03.02: AMENDMENT OF SECTION R112.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R112 of the Residential Code is hereby amended to read as follows:
PAGE 94 of 623
R112.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of the Residential Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council.
The Building Official shall be an ex officio member of and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedures for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Residential Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.03.03: AMENDMENT OF SECTION R113.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R113.1 of the Residential Code is amended to read as follows:
R113.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy, or maintain any building, structure or equipment or cause or permit the same to be done in violation of the Residential Code.
It is hereby declared that any violation of the Residential Code constitutes a public nuisance, and in addition to any other remedies provided by the Residential Code for its enforcement, the City Council may bring civil suit to enjoin the violation of any provisions of this Residential Code.
Any person, firm or corporation violating any of the provisions of the Residential Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03A of this Code. Each separate day or any portion thereof during which violation of the Residential Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
25.03.04: AMENDMENT OF SECTIONS RIl08.2 AND R108.5:
Notwithstanding the provisions of section 25.03.01 of this article, sections R108.2 and R108.5 of the Residential Code are amended to read as follows:
R108.2 Schedule of permit fees. The fee for each permit shall be as periodically established by City Council resolution.
R108.2.1 Plan review fees. When plans or other data are required pursuant to Section R106, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be one-hundred percent (100%) of the building permit fee established by resolution of the City Council.
R108.2.2 Expiration of plan review. Applications for which no permit is issued within 180 days following the date the application or the date of final approval, if one exists, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant PAGE 95 of 623
or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days on written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.
R108.2.3 Expiration of building permits. Building permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit.
The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
If an applicant wishes to renew a permit that has been expired for less than 6 months, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 6 months, 100% of the original fees paid shall be required to renew the permit.
R108.5 Fee refunds. The Building Official may authorize refunding of any fee paid hereunder that was erroneously paid or collected.
The Building Official may authorize the refunding of not more than 80% of the permit fee paid when no work has been done under a permit in accordance with the Residential Code.
The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee within 60 days of the date of fee payment. (Ord. 0-19-1357, 11-13-2019)
25.03.05: ADDITION OF SECTIONS Rl09.1.5.4, RIl09.1.5.5, and R109.1.6.3:
Notwithstanding the provisions of section 25.03.01 of this article, new sections R109.1.5.3, R109.1.5.3, and R109.1.6.3 are added to the Residential Code to read as follows:
R109.1.5.4 Prior to frame approval, a rough zoning inspection is required in order to ensure compliance with the approved Development Plans.
R109.1.5.5 Prior to final approval, a final zoning inspection by Planning Department staff is required in order to ensure final compliance with approved Development Plans.
R109.1.6.3 Connections prohibited. Unless approval has been first obtained from the Building Official, the connection of gas or electrical utilities shall be prohibited until the final building, heating, air conditioning, electrical, plumbing and grading inspections, as required, are completed and approval has been granted on any building.
(Ord. 0-19-1357, 11-13-2019)
25.03.06: AMENDMENT OF TABLE R301.2.2.1.1 AND SECTION R301.2.2.1.2:
PAGE 96 of 623
Notwithstanding the provisions of section 25.03.01 of this article, table R301.2.2.1.1 and section R301.2.2.1.2 of the Residential Code are amended to read as follows:
TABLE R301.2.2.1.1
SEISMIC DESIGN CATEGORY DETERMINATION
R301.2.2.1.2 Alternative determination of Seismic Design Category E. Buildings located in Seismic Design Category E in accordance with Figure R301.2(2) are permitted to be reclassified as being in Seismic Design Category D2 provided one of the following is done:
1. A more detailed evaluation of the seismic design category is made in accordance with the provisions and maps of the California Building Code. Buildings located in Seismic Design Category E per Table R301.2.2.1.1, but located in Seismic Design Category D per the California Building Code, may be designed using the Seismic Design Category D2 requirements of this code.
2. Buildings located in Seismic Design Category E that conform to the following additional restrictions are permitted to be constructed in accordance with the provisions for Seismic Design Category D2 of this code:
2.1. All exterior shear wall lines or braced wall panels are in one plane vertically from the foundation to the uppermost story.
2.2. Floors shall not cantilever past the exterior walls.
2.3. The building is within all of the requirements of Section R301.2.2.5 for being considered as regular.
2.4. For buildings over one story in height, the calculated SDS shall not exceed l.25g. (Ord. 0-19-1357, 11-13-2019)
25.03.07: AMENDMENT OF SECTION R301.2.2.6:
Notwithstanding the provisions of section 25.03.01 of this article, items 1, 3 and 5 of section R301.2.2.6 of the Residential Code are amended to read as follows:
1. When exterior shear wall lines or braced wall panels are not in one plane vertically from the foundation to the uppermost story in which they are required.
3. When the end of a braced wall panel occurs over an opening in the wall.
PAGE 97 of 623
5. When portions of a floor level are vertically offset. (Ord. 0-19-1357, 11-13-2019)
25.03.08: ADDITION OF SECTION R301.2.2.11:
Notwithstanding the provisions of section 25.03.01 of this article, section R301.2.2.11 is added to the Residential Code to read as follows:
R301.2.2.11 Anchorage of Mechanical, Electrical, or Plumbing Components and Equipment. Mechanical, electrical, or plumbing components and equipment shall be anchored to the structure. Anchorage of the components and equipment shall be designed to resist loads in accordance with the International Building Code and ASCE 7, except where the component is positively attached to the structure and flexible connections are provided between the component and associated ductwork, piping, and conduit; and either
1. The component weighs 400 lb (1,780 N) or less and has a center of mass located 4 ft (1.22 m) or less above the supporting structure; or
2. The component weighs 20 lb (89N) or less or, in the case of a distributed system, 5 lb/ft (73 N/m) or less.
(Ord. 0-19-1357, 11-13-2019)
25.03.09: ADDITION OF SECTION R337.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R337 is added to the Residential Code to read as follows:
R337.1 Application-New Buildings. All new residential buildings of any occupancy that are located in the Very High Fire Hazard Severity Zone (VHFHSZ) as designated by the City of San Marino.
R337.2 Application-Additions & Remodels. The addition and remodeling areas of existing building of any occupancy that are located within the Very High Fire Hazard Severity Zone (VHFHSZ) as designated by the city of San Marino.
337.3 Protection of enclosed eaves. The exposed underside of enclosed roof eaves and soffits shall be protected on the exposed underside by one or more of the following:
1. Noncombustible materials.
2. Ignition-resistant building materials.
3. Materials approved for not less than 1-hour fire-resistance-rated construction on the exterior side, as tested in accordance with ASTM E119 or UL 263.
4. 2-inch (51 mm) nominal dimension lumber.
5. 1-inch (25 mm) nominal fire-retardant-treated lumber or 3/4-inch (19.1 mm) nominal fire-retardant-treated plywood, identified for exterior use and complying with Section 2303.2 of the California Building Code.
6. Boxed-in roof eave soffit assemblies with an underside that meets the performance criteria as determined by the Building Official when tested in accordance with the test procedures set forth in ASTM E2957.
PAGE 98 of 623
7. Boxed-in roof eave soffit assemblies with an underside that meets the performance criteria in accordance with the test procedures set forth in SFM Standard 12-7A-3.
Facias are required and shall be ignition-resistant building materials, fire-retardanttreated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code, materials approved for not less than 1-hour fire-resistance rated construction or 2-inch (51 mm) nominal dimension lumber. 337.3.1 Protection of open eaves. The exposed roof deck on the underside of unenclosed roof eaves shall consist of one or more of the following:
1. Noncombustible material.
2. Ignition-resistant building material.
3. Fire-retardant-treated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code.
4. Materials approved for not less than 1-hour fire-resistance-rated construction on the exterior side, as tested in accordance with ASTM E119 or UL 263.
5. 2-inch (51 mm) nominal dimension lumber.
6. One layer of 5/8-inch (16 mm) Type X gypsum sheathing applied behind an exterior covering on the underside of the roof deck.
7. The exterior portion of a 1-hour fire-resistance-rated exterior assembly, as tested in accordance with ASTM E119 or UL 263, applied to the underside of the roof deck designed for exterior fire exposure, including assemblies using the gypsum panel and sheathing products listed in the Gypsum Association Fire Resistance Design Manual.
Facias, if provided, shall be of fire-retardant-treated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code, ignition-resistant building materials, materials approved for not less than 1-hour fire-resistance-rated construction or 2-inch (51 mm) nominal dimension lumber. 337.10 Vents. Where provided, ventilation openings for enclosed attics, gable ends, ridge ends, under eaves and cornices, enclosed eave soffit spaces, enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters, underfloor ventilation, foundations and crawl spaces, or any other opening intended to permit ventilation, either in a horizontal or vertical surface, shall be in accordance with Section 337.10.1 or Section 337.10.2 to resist building ignition from the intrusion of burning embers and flame through the ventilation openings. 337.10.1 Performance requirements. Ventilation openings shall be fully covered with Wildfire Flame and Ember Resistant vents approved and listed by the California State Fire Marshal, or WUI vents, tested in accordance with ASTM E2886, to demonstrate compliance with all the following requirements:
1. There shall be no flaming ignition of the cotton material during the Ember Intrusion Test.
2. There shall be no flaming ignition during the Integrity Test portion of the Flame Intrusion Test.
3. The maximum temperature of the unexposed side of the vent shall not exceed 662°F (350°C).
PAGE 99 of 623
337.10.2 Off ridge and ridge vents. Vents that are installed on a sloped roof, such as dormer vents, shall comply with all of the following:
1. Vents shall be covered with a mesh where the dimensions of the mesh therein shall be a minimum of 1/16 inch (1.6 mm) and
shall not exceed 1/8 inch (3.2 mm) in diameter.
2. The vent and mesh material shall be noncombustible.
3. The vent and mesh material shall be corrosion resistant. 337.10.3 Vent locations. Gable-end and dormer vents shall be located not less than 10 feet (3048 mm) from lot lines. Underfloor ventilation openings shall be located as close to grade as practical
25.03.1009: AMENDMENT OF SECTION R401.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R401.1 of the Residential Code is amended to read as follows:
R401.1 Application. The provisions of this chapter shall control the design and construction of the foundation and foundation spaces for all buildings. In addition to the provisions of this chapter, the design and construction of foundations in areas prone to flooding as established by Table R301.2(1) shall meet the provisions of Section R322. Wood foundations shall be designed and installed in accordance with AWCF&PA PWF.
Exception: The provisions of this chapter shall be permitted to be used for wood foundations only in the following situations:
1. In buildings that have no more than two floors and a roof.
2. When interior basement and foundation walls are constructed at intervals not exceeding 50 feet (15 240 mm).
Wood foundations in Seismic Design Category D0, D1 or D2 shall not be permitted.
Exception: In non-occupied, single-story, detached storage sheds and similar uses other than carport or garage, provided the gross floor area does not exceed 200 square feet, the plate height does not exceed 12 feet in height above the grade plane at any point, and the maximum roof projection does not exceed 24 inches.
(Ord. 0-19-1357, 11-13-2019)
25.03.101: AMENDMENT OF SECTIONS R403.1.2, R403.1.3 AND R403.1.5:
Notwithstanding the provisions of section 25.03.01 of this article, sections R403.1.2, R403.1.3 and R403.1.5 of the Residential Code are amended to read as follows:
R403.1.2 Continuous footing in Seismic Design Categories Do, D1i and D2. The braced wall panels at exterior walls of buildings located in Seismic Design Categories D0, D1 and D2 shall be supported by continuous footings. All required interior braced wall panels in buildings shall be supported by continuous footings.
PAGE 100 of 623
R403.1.3 Seismic reinforcing. Concrete footings located in Seismic Design Categories D0, D1 and D2, as established in Table R301.2(1), shall have minimum reinforcement. Bottom reinforcement shall be located a minimum of 3 inches (76 mm) clear from the bottom of the footing.
In Seismic Design Categories D0, D1 and D2 where construction joint is created between a concrete footing and a stem wall, a minimum of one No. 4 bar shall be installed at not more than 4 feet (1219 mm) on center. The vertical bar shall extend to 3 inches (76 mm) clear of the bottom of the footing, have a standard hook and extend a minimum of 14 inches (357 mm) into the stem wall.
In Seismic Design Categories D0, D1 and D2 where a grouted masonry stem wall is supported on a concrete footing and stem wall, a minimum of one No. 4 bar shall be installed at not more than 4 feet (1219 mm) on center. The vertical bar shall extend to 3 inches (76 mm) clear of the bottom of the footing and have a standard hook.
In Seismic Design Categories D0, D1 and D2 masonry stem walls without solid grout and vertical reinforcing are not permitted.
Exception: In detached one- and two-family dwellings located in Seismic Design Category A, B or C which are three stories or less in height and constructed with stud bearing walls, isolated plain concrete footings, supporting columns or pedestals are permitted.
R403.1.5 Slope. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).
For structures located in Seismic Design Categories D0, D1 or D2, stepped footings shall be reinforced with four No. 4 rebar. Two bars shall be place at the top and bottom of the footings as shown in Figure R403.1.5.
PAGE 101 of 623
FIGURE R403.1.5
STEPPED FOOTING
(Ord. 0-19-1357, 11-13-2019)
25.03.121: AMENDMENT OF SECTION R404.2:
Notwithstanding the provisions of section 25.03.01 of this article, section R404.2 of the Residential Code is amended to read as follows:
R404.2 Wood foundation walls. Wood foundation walls shall be constructed in accordance with the provisions of Sections R404.2.1 through R404.2.6 and with the details shown in Figures R403.1(2) and R403.1(3). Wood foundation walls shall not be used for structures located in Seismic Design Category D0, D1 or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.132: AMENDMENT OF SECTION R501.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R501.1 of the Residential Code is amended to read as follows:
R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces used to house mechanical or plumbing fixtures and equipment. Mechanical or plumbing fixtures and equipment shall be attached (or anchored) to the structure in accordance with Section R301.2.2.11. (Ord. 0-19-1357, 11-13-2019)
25.03.143: ADDITION OF SECTION R503.2.4:
PAGE 102 of 623
Notwithstanding the provisions of section 25.03.01 of this article, section R503.2.4 is added to the Residential Code to read as follows:
R503.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms with a dimension perpendicular to the joist that is greater than 4 feet (1.2 m) shall be constructed in accordance with Figure R503.2.4.
a. Blockings shall be provided beyond headers.
b. Metal ties not less than 0.058 inch [1.47 mm (16 galvanized gage)] by 1.5 inches (38 mm) wide with eight 16d common nails on each side of the header-joist intersection. The metal ties shall have a minimum yield of 33,000 psi (227 MPa).
c. Openings in diaphragms shall be further limited in accordance with Section R301.2.2.2.5.
FIGURE R503.2.4
OPENINGS IN HORIZONTAL DIAPHRAGMS
(Ord. 0-19-1357, 11-13-2019)
25.03.1514: AMENDMENT OF TABLE R602.3(1):
Notwithstanding the provisions of section 25.03.01 of this article, lines 37 and 38 of table R602.3(1) of the Residential Code are amended to read as follows:
TABLE R602.3(1)
FASTENER SCHEDULE FOR STRUCTURAL MEMBERS
PAGE 103 of 623
PAGE 104 of 623
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 mile per hour = 0.447 m/s; 1 Ksi = 6.895 MPa. a. All nails arc smooth-common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall have minimum average bending yield strengths as shown: 80 ksi for shank diameter of 0.192 inch (20d common nail), 90 ksi for shank diameters larger than 0.142 inch but not larger than 0.177 inch, and 100 ksi for shank diameters of 0.142 inch or less.
b. Staples are 16 gage wire and have a minimum 7/6-inch on diameter crown width. b. c. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches or greater.
c.d. Four-foot by 8-fool or 4-foot by 9-foot panels shall be applied vertically. d.e. Spacing of fasteners not included in this table shall be based on Table R602.3(2). e.f. For regions having basic wind speed of 110 mph or greater, 8d deformed (2'/2"x 0.120) nails shall be used for attaching plywood and wood structural panel roof sheathing to framing within minimum 4S-inch distance from gable end walls, if mean roof height is more than 25 feet, up to 35 feet maximum.
PAGE 105 of 623
f.g. For regions having bask wind speed of 100 mph or less, nails for attaching wood structural panel roof sheathing to gable end wall framing shall be spaced 6 inches on center. When basic wind speed is greater than 100 mph, nails for attaching panel roof sheathing to intermediate supports shall be spaced 6 inches on center for minimum 48-inch distance from ridges, eaves and gable end walls; and 4 inches on center to gable end wall framing. g.h. Gypsum sheathing shall conform to ASTM C 1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall conform to ASTM C 208. h.i. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and at all floor perimeters only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members and required blocking. Blocking of roof or floor sheathing panel edges perpendicular to the framing members need not be provided except as required by other provisions of this code. Floor perimeter shall be supported by framing members or solid blocking.
i.j. Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one side of the rafter and toe nails from the ceiling joist to top plate in accordance with this schedule. The toe nail on the opposite side of the rafter shall not be required.
j.K. Use of staples in braced wall panels shall be prohibited in Seismic Design Category D0, D1, or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.1516: AMENDMENT OF TABLE R602.3(2):
Notwithstanding the provisions of section 25.03.01 of this article, footnote "b" of table R602.3(2) of the Residential Code is amended to read as follows:
b. Staples shall have a minimum crown width of 7/16-inch on diameter except as noted. Use of staples in roof, floor, subfloor, and braced wall panels shall be prohibited in Seismic Design Category D0, D1, or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.176: AMENDMENT OF SECTION R602.10.3(3):
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.3(3) of the Residential Code is amended to read as follows:
PAGE 106 of 623
PAGE 107 of 623
PAGE 108 of 623
PAGE 109 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.187: AMENDMENT OF TABLE R602.10.4:
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.4 of the Residential Code is amended to read as follows:
PAGE 110 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.198: AMENDMENT OF FIGURE R602.10.6.1:
Notwithstanding the provisions of section 25.03.01 of this article, figure R602.10.6.1 of the Residential Code is amended to read as follows:
PAGE 111 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.2019: AMENDMENT OF FIGURE R602.10.6.2:
Notwithstanding the provisions of section 25.03.01 of this article, figure R602.10.6.2 of the Residential Code is amended to read as follows:
PAGE 112 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.210: AMENDMENT OF TABLE R602.10.5:
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.5 of the Residential Code is amended to read as follows:
TABLE R602.10.5 602.10.6.5.4
MINIMUM LENGTH OF BRACED WALL PANELS
PAGE 113 of 623
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, I mile per hour=Q.447 m/s. NP = Not Permitted.
PAGE 114 of 623
a. Linear interpolation shall be permitted.
b. Use the actual length when it is greater than or equal lo the minimum length. c. Maximum header height for PFH is 10 feet in accordance with Figure R602.10.6.2, but wall height may be increased to 12 feet with pony wall.
d. Maximum opening height for PFG is 10 feet in accordance with Figure R602.10.6.3. but wall height maybe increased to 12 feet with pony wall,
e. Maximum opening height for CS-PF is 10 feet in accordance with Figure R602.10.6.4. but wall height may be increased to 12 feet with pony wall. (Ord. 0-19-1357, 11-13-2019)
25.03.221: AMENDMENT OF SECTION R602.10.2.3:
Notwithstanding the provisions of section 25.03.01 of this article, section R602.10.2.3 of the Residential Code is amended to read as follows:
R602.10.2.3 Minimum number of braced wall panels. Braced wall lines with a length of 16 feet (4877 mm) or less shall have a minimum of two braced wall panels of any length or one braced wall panel equal to 48 inches (1219 mm) or more. Braced wall lines greater than 16 feet (4877 mm) shall have a minimum of two braced wall panels. No braced wall panel shall be less than 48 inches in length in Seismic Design Category D0, D1, or D2. (Ord. 0-19-1357, 11-13-2019)
25.03.232: AMENDMENT OF SECTION R606.4.4:
Notwithstanding the provisions of section 25.03.01 of this article, section R606.4.4 of the Residential Code is amended to read as follows:
R606.4.4 Parapet walls. Unreinforced solid masonry parapet walls shall not be less than 8 inches (203 mm) thick and their height shall not exceed four times their thickness. Unreinforced hollow unit masonry parapet walls shall be not less than 8 inches (203 mm) thick, and their height shall not exceed three times their thickness. Masonry parapet walls in areas subject to wind loads of 30 pounds per square foot (1.44 kPa) or located in Seismic Design Category D0, DI or D2, or on townhouses in Seismic Design Category C shall be reinforced in accordance with Section R606.12.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.03.243: AMENDMENT OF SECTION R606.12.2.2.3:
Notwithstanding the provisions of Section 25.03.01 of this article, section R606.12.2.2.3 of the Residential Code is amended to read as follows:
R606.12.2.2.3 Reinforcement requirements for masonry elements. Masonry elements listed in Section R606.12.2.2.2 shall be reinforced in either the horizontal or vertical direction as shown in Figure R606.11(32) and in accordance with the following:
PAGE 115 of 623
1. Horizontal reinforcement. Horizontal joint reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Horizontal reinforcement shall be provided within 16 inches (406 mm) of the top and bottom of these masonry elements.
2. Vertical reinforcement. Vertical reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Vertical reinforcement shall be within 8 inches (406mm) of the ends of masonry walls.
(Ord. 0-19-1357, 11-13-2019)
25.03.2524: AMENDMENT OF SECTION R602.3.2:
Notwithstanding the provisions of section 25.03.01 of this article, section R602.3.2, Exception, of the Residential Code is amended to read as follows:
Exception: In other than Seismic Design Category D0, D1 or D2, a single top plate may be installed in stud walls, provided the plate is adequately tied at joints, corners and interesting walls by a minimum 3-inch-by-6-inch by a 0.036-inch-thick (76 mm by 152 mm by 0.914 mm) galvanized steel plate that is nailed to each wall or segment of wall by six 8d nails on each side, provided the rafters or joists are centered over the studs with a tolerance of no more than 1 inch (25 mm). The top plate may be omitted over lintels that are adequately tied to adjacent wall sections with steel plates or equivalent as previously described. (Ord. 0-19-1357, 11-13-2019)
25.03.265: ADDITION OF SECTION R803.2.4:
Notwithstanding the provisions of section 25.03.01 of this article, section R803.2.4 is added to the Residential Code to read as follows:
R803.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms shall conform with Section R503.2.4.
(Ord. 0-19-1357, 11-13-2019)
25.03.276: AMENDMENT OF SECTION R1001.3.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R1001.3.1 of the Residential Code is amended to read as follows:
R1001.3.1Vertical reinforcing. For chimneys up to 40 inches (1016 mm) wide, four No. 4 continuous vertical bars adequately anchored into the concrete foundation shall be placed between wythes of solid masonry or within the cells of hollow unit masonry and grouted in accordance with Section R609. Grout shall be prevented from bonding with the flue liner so that the flue liner is free to move with thermal expansion. For chimneys more than 40 inches (1016 mm) wide, two additional No. 4 vertical bars adequately anchored into the concrete foundation shall be provided for each additional flue incorporated into the chimney or for each additional 40 inches (1016 mm) in width or fraction thereof.
(Ord. 0-19-1357, 11-13-2019)
Section 4. New Article 04 Plumbing Code is hereby added to Chapter 25 of the San PAGE 116 of 623
Marino City Code to read as follows:
ARTICLE 04
PLUMBING CODE
SECTION:
25.04.01: Plumbing Code Adopted
25.04.02: Amendment Of Section 103.3
25.04.03: Amendment Of Sections 104.3.2 And 104.3.3
25.04.04: Amendment Of Section 104.4.3
25.04.05: Amendment Of Section 104.4.5
25.04.06: Amendment Of Section 104.5
25.04.07: Amendment Of Section 105.2.6
25.04.08: Amendment Of Sections 106.1 And 106.3
25.04.09: Amendment Of Section 203.0
25.04.10: Addition Amendment Of Section 312.13
25.04.11: Addition Amendment Of Section 511.0
25.04.12: Addition Of Section 713.8
25.04.13: Addition Amendment Of Section 906.8
25.04.01: PLUMBING CODE ADOPTED:
Except as hereinafter provided, the California Plumbing Code, 20252 Edition, based on the 20241 Uniform Plumbing Code as published by the International Association of Plumbing and Mechanical Officials, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Plumbing Code of the City. A copy of said Code has been deposited in the office of the City Clerk and shall be, at all times, maintained by the City Clerk for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.04.02: AMENDMENT OF SECTION 103.3:
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 103.3 of the Plumbing Code is amended to read as follows:
Issuance. The Building Official or his/her designee shall review the application, plans and specifications and other data filed by an applicant for a permit. Other departments of this jurisdiction may also review plans. If the Building Official or his/her designee finds that the work described in an application for permit and the plans, specifications and other data filed therewith conform to the requirements of the Plumbing Code and other pertinent laws and ordinances, and that the fees established by resolution of the City Council have been paid, he/she shall issue a permit therefore to the applicant.
(Ord. 0-19-1357, 11-13-2019)
25.04.03: AMENDMENT OF SECTIONS 104.3.2 AND 104.3.3:
PAGE 117 of 623
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 104.3.2, and section 104.3.3, of the Plumbing Code are amended to read as follows:
104.3.2 Plan Review Fees. When a plan or other data are required to be submitted by Section 104.3.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for plumbing work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council.
104.3.3 Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.
(Ord. 0-19-1357, 11-13-2019)
25.04.04: AMENDMENT OF SECTION 104.4.3:
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 104.4.3 of the Plumbing Code is amended to read as follows:
Expiration. Plumbing permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. (Ord. 0-19-1357, 11-13-2019)
25.04.05: AMENDMENT OF SECTION 104.4.5:
Notwithstanding the provisions of section 25.04.01 of this article, section 104.4.5 of the Plumbing Code is amended to read as follows:
Suspension or Revocation. The Building Official or his/her designee may, in writing, suspend or revoke a permit issued under the provisions of this Code whenever the permit is issued in error or on the basis of incorrect information supplied or in violation of other ordinances or regulations of the City.
PAGE 118 of 623
(Ord. 0-19-1357, 11-13-2019)
25.04.06: AMENDMENT OF SECTION 104.5:
Notwithstanding the provisions of section 25.04.01 of this article, section 104.5 of the Plumbing Code is amended to read as follows:
104.5 Permit Fees. All fees pursuant to the Plumbing Code as set forth in Table No. 104.5 shall be established by resolution of the City Council.
104.5.1 Whenever any work for which a permit is required by the Plumbing Code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.
104.5.2 An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the Plumbing Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Plumbing Code nor from any penalty prescribed by law. 104.5.3 Fee Refunds.
104.5.3(1) The Building Official may authorize the refunding of any fee paid hereunder which was erroneously paid or collected.
104.5.3(2) The Building Official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Plumbing Code.
104.5.3(3) The Building Official shall not authorize the refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
(Ord. 0-19-1357, 11-13-2019)
25.04.07: AMENDMENT OF SECTION 105.2.6:
Notwithstanding the provisions of section 25.04.01 of this article, the fourth paragraph of section 105.2.6 of the Plumbing Code is amended to read as follows:
To obtain reinspection, the applicant shall file an application therefor in writing upon a form furnished for that purpose and pay the reinspection fee established by resolution of the City Council.
(Ord. 0-19-1357, 11-13-2019)
25.04.08: AMENDMENT OF SECTIONS 106.1 AND 106.3:
Notwithstanding the provisions of section 25.04.01 of this article, sections 106.1 and 160.3 of the Plumbing Code are amended to read as follows:
PAGE 119 of 623
106.1 Violations. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, or maintain any plumbing or permit the same to be done in violation of the Plumbing Code. 106.3 Penalties. Any person, firm or corporation violating any provision of the Plumbing Code shall be deemed guilty of a misdemeanor, and, upon conviction thereof, shall be punishable as provided in Section 01.04.03 A of this Code. Each separate day or any portion thereof, during which any violation of this code occurs or continues, shall be deemed to constitute a separate offence.
(Ord. 0-19-1357, 11-13-2019)
25.04.09: AMENDMENT OF SECTION 203.0:
Notwithstanding the provisions of section 25.04.01 of this article, section 203.0 of the Plumbing Code is amended by revising the following definitions to read as follows:
Accessible. "Accessible," when applied to a fixture, connection, appliance, or equipment, shall mean having access thereto, but which first may require the removal of an access panel, door, or similar obstruction; "readily accessible" shall mean direct access without the necessity of removing any panel, door, or similar obstruction. Attic and underfloor areas are to be considered "accessible."
Authority Having Jurisdiction. Whenever the term "Authority Having Jurisdiction" is used in the Plumbing Code, it shall mean the Building Official or his/her authorized representative. (Ord. 0-19-1357, 11-13-2019)
25.04.10: ADDITION AMENDMENT OF SECTION 312.13:
Notwithstanding the provisions of section 25.04.01 of this article, section 312.13 is added to the Plumbing Code read as follows:
312.13 Soil, waste, water or other pipe or conduit, except downspouts, shall not be installed or permitted on the outside of a building unless the Building Official deems it necessary. (Ord. 0-19-1357, 11-13-2019)
25.04.11: ADDITION AMENDMENT OF SECTION 511.0:
Notwithstanding the provisions of section 25.04.01 of this article, section 511 is added to the Plumbing Code read as follows:
511.0 No vent shall terminate in a location that is visible from the parkway across the street from the subject property, or to the side elevation facing a side street on a corner lot unless the Building Official deems it necessary.
(Ord. 0-19-1357, 11-13-2019)
25.04.12: ADDITION OF SECTION 713.8:
PAGE 120 of 623
Notwithstanding the provisions of section 25.04.01 of this article, section 713.8 is added to the Plumbing Code read as follows:
713.8 The City Engineer shall determine the availability of the sewer lines. No person shall construct, or enlarge a new or existing cesspool if a sewer line has been declared available. (Ord. 0-19-1357, 11-13-2019)
25.04.13: ADDITION AMENDMENT OF SECTION 906.8:
Notwithstanding the provisions of section 25.04.01 of this article, section 906.8 is added to the Plumbing Code to read as follows:
906.8 No vent shall terminate in a location that is visible from the parkway across the street from the subject property, or to the side elevation facing a side street on a corner lot unless the Building Official deems it necessary.
(Ord. 0-19-1357, 11-13-2019)
Section 5. New Article 05 Mechanical Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 05
MECHANICAL CODE
SECTION:
25.05.01: Mechanical Code Adopted
25.05.02: Amendment Of Section 1043.43
25.05.03: Amendment Of Sections 104.3.2 And 104.3.3
25.05.04: Amendment Of Sections 104.4.3 And 104.4.5
25.05.05: Amendment Of Section 104.5
25.05.06: Amendment Of Section 107.1
25.05.07: Amendment Of Section 106.0
25.05.01: MECHANICAL CODE ADOPTED:
Except as hereinafter provided, the California Mechanical Code, 20252 Edition, based on the 20241 Uniform Mechanical Code as published by the International Association of Plumbing and Mechanical Officials, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Mechanical Code of the City. A copy of such Code shall be located in the office of the City Clerk and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. For the purposes of this Code, the Building Official shall be the Building Official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.05.02: AMENDMENT OF SECTION 1043.3:4
PAGE 121 of 623
Notwithstanding the provisions of section 25.05.01 of this article, section 103.3 of the Mechanical Code is amended to include an additional paragraph to read as follows:
The Building Official shall review applications, plans, specifications, computations and other data filed by an applicant for a permit. Such plans may be reviewed by other departments of this City to verify compliance with applicable laws under their jurisdiction. If the Building Official finds that the work described in an application for a permit and the plans, specifications and other data filed therewith conform to the requirements of the Mechanical Code and other pertinent laws and ordinances and that the fees established by Resolution of the City Council have been paid, the Building Official shall issue a permit therefor to the applicant. (Ord. 0-19-1357, 11-13-2019)
25.05.03: AMENDMENT OF SECTIONS 104.3.2 AND 104.3.3:
Notwithstanding the provisions of section 25.05.01 of this article, sections 104.3.2 and 104.3.3 of the Mechanical Code are amended to read as follows:
104.3.2 Plan Review Fees. When a plan or other data are required to be submitted by this code a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for mechanical work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. The plan review fees specified in this subsection are separate fees from the permit fees specified in Section 104.5 and are in addition to the permit fees.
When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council. 104.3.3 Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration the applicant shall resubmit plans and pay a new plan review fee.
(Ord. 0-19-1357, 11-13-2019)
25.05.04: AMENDMENT OF SECTIONS 104.4.3 AND 104.4.5:
Notwithstanding the provisions of section 25.05.01 of this article, sections 104.4.3 and 104.4.5 of the Mechanical Code are amended to read as follows:
104.4.3 Expiration. Mechanical permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the PAGE 122 of 623
permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
104.4.5 Suspension or Revocation. The Building Official may, in writing, suspend or revoke a permit issued under the provisions of the City Code whenever the permit is issued in error or on the basis of incorrect information supplied or in violation of other ordinances or regulations of the City.
(Ord. 0-19-1357, 11-13-2019)
25.05.05: AMENDMENT OF SECTION 104.5:
Notwithstanding the provisions of section 25.05.01 of this article, section 104.5 of the Mechanical Code is amended to read as follows:
104.5 FEES.
All fees pursuant to the Mechanical Code shall be as established by and set forth in a resolution of the City Council.
104.5.1 Permit Fees. All fees pursuant to the Mechanical Code shall be as amended and established by resolution of the City Council.
104.5.2 Investigation. Whenever any work which requires a permit pursuant to the Mechanical Code has been commenced without first obtaining said permit, a special Investigation shall be made before a permit may be issued for such work.
104.5.2.1 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit fee is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the City Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Mechanical Code nor from any penalty prescribed by law. 104.5.3 Fee Refunds.
104.5.3(1) The Building Official may authorize the refunding of any fee paid hereunder that was erroneously paid or collected.
104.5.3(2) The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Mechanical Code.
104.5.3(3) The Planning and Building Department shall not authorize refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
(Ord. 0-19-1357, 11-13-2019)
25.05.06: AMENDMENT OF SECTION 107.1:
PAGE 123 of 623
Notwithstanding the provisions of section 25.05.01 of this article, section 107.1 of the Mechanical Code is hereby amended to read as follows:
107.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of the Mechanical Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council.
The Building Official shall be an ex officio member of and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedures for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Mechanical Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.05.07: AMENDMENT OF SECTION 106.0:
Notwithstanding the provisions of section 25.05.01 of this article, section 106.0 of the Mechanical Code is amended to read as follows:
106.10 Violations. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, impound, remove, convert or demolish, equip, use or maintain mechanical systems or equipment or cause or permit the same to be done in violation of the Mechanical Code.
It is hereby declared that any violation of the Mechanical Code constitutes a public nuisance, and in addition to any other remedies provided by the Mechanical Code for its enforcement, the administrative authority may bring civil suit to enjoin the violation of any provisions of the Mechanical Code.
Any person, firm or corporation violating any of the provisions of the Mechanical Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in Section 01.04.03 A of this Code. Each separate day or any portion thereof during which violation of the Mechanical Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
Section 6. New Article 06 Electrical Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 06
ELECTRICAL CODE
SECTION:
25.06.01: Electrical Code Adopted
25.06.02: Amendment Of Article 100
25.06.03: Fees And Expiration
PAGE 124 of 623
25.06.04: Additions To Electrical Code
25.06.05: Service Entrance Panels
25.06.06: Grounding And Bonding Connections
25.06.07: Use Of Factory Assembled Conduits
25.06.08: Use Of Aluminum
25.06.09: Service Entrance - Services
25.06.10: Amendment To Section 250.50
25.06.11: Addition Of Section 690.19
25.06.12: Violations
25.06.01: ELECTRICAL CODE ADOPTED:
Except as hereinafter provided, the California Electrical Code, 20252 Edition, based on the 20241 National Electrical Code as published by the National Fire Protection Association, including all annexes, is hereby adopted by reference and incorporated herein as though set forth herein in full and shall constitute the Electrical Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.06.02: AMENDMENT OF ARTICLE 100:
Notwithstanding the provisions of section 25.06.01 of this article, article 100 of the Electrical Code is amended by amending the definition of "Accessible, Readily" to read as follows:
Accessible, Readily: (Readily Accessible.) Capable of being reached quickly for operation, renewal, or inspections, without requiring those to whom ready access is requisite to climb over or remove obstacles or to resort to portable ladders, chairs, etc. (See "Accessible.") Attic and crawl spaces are not considered readily accessible.
(Ord. 0-19-1357, 11-13-2019)
25.06.03: FEES AND EXPIRATION:
Notwithstanding the provisions of section 25.06.01 of this article, all fees pursuant to the Electrical Code shall be those amounts established by resolution of the City Council.
Plan Review Fees. When a plan or other data are required to be submitted by this code a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for electrical work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. The plan review fees specified in this subsection are separate fees from the permit fees and are in addition to the permit fees. When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council.
Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 PAGE 125 of 623
days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration the applicant shall resubmit plans and pay a new plan review fee.
Investigation. Whenever any work which requires a permit pursuant to the Electrical Code has been commenced without first obtaining said permit, a special Investigation shall be made before a permit may be issued for such work.
Investigation Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit fee is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the City Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Electrical Code nor from any penalty prescribed by law.
Fee Refunds. The Building Official may authorize the refunding of any fee paid hereunder that was erroneously paid or collected. The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Electrical Code. The Planning and Building Department shall not authorize refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
Expiration. Electrical permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. (Ord. 0-19-1357, 11-13-2019)
25.06.04: ADDITIONS TO ELECTRICAL CODE:
Notwithstanding the provisions of section 25.06.01 of this article, the Electrical Code is amended by adding the sections as set forth in sections 25.06.05 through 25.06.11 of this article. (Ord. 0-19-1357, 11-13-2019)
25.06.05: SERVICE ENTRANCE PANELS:
A. All new residences shall be provided with a minimum service capacity of not less than two hundred (200) amperes main. Service conduit shall be two-inch (2") conduit.
B. On existing dwellings if the service is replaced, the minimum service shall be one hundred (100) amperes main. Service conduit shall be one and one-half inches (1-½").
PAGE 126 of 623
C. Branch circuit panel shall contain space for a minimum of twenty (20) single pole overcurrent devices.
(Ord. 0-19-1357, 11-13-2019)
25.06.06: GROUNDING AND BONDING CONNECTIONS:
A. The connection of grounding conductor to grounding electrode shall be readily accessible.
B. The connection of the bond from the grounding conductor to the cold water and gas systems shall be readily accessible.
C. All conduit shall contain a green ground wire.
(Ord. 0-19-1357, 11-13-2019)
25.06.07: USE OF FACTORY ASSEMBLED CONDUITS:
Notwithstanding any provision of the Electrical Code to the contrary, the following is prohibited in new installations:
A. Factory assembled conduits, such as:
1. Mineral insulated sheathed cable.
2. Armored cable unless:
a. Factory assembled in an Underwriters Laboratory approved fixture; b. Green insulated copper grounding conductor; and
c. Is used for applications not to exceed nine feet (9') from a power source to a single fixture.
3. Extension of any knob and tube.
(Ord. 0-19-1357, 11-13-2019)
25.06.08: USE OF ALUMINUM:
Notwithstanding any provision of the Electrical Code to the contrary, the following are prohibited in new installations:
A. Aluminum wire is not permitted.
B. Aluminum conduit is not approved as a self-grounding conduit. (Ord. 0-19-1357, 11-13-2019)
25.06.09: SERVICE ENTRANCE - SERVICES:
A. New service entrance conductors on all commercial buildings shall be installed underground.
B. A contractor licensed C-10 or B-1 must apply for the permit for any new service or service change out.
PAGE 127 of 623
(Ord. 0-19-1357, 11-13-2019)
25.06.10: AMENDMENT TO SECTION 250.50:
Notwithstanding the provisions of section 25.06.01 , an additional exception is added to section 250.50 to read as follows:
Exception: Grounding of electrical services replaced in existing residential buildings.
When an electrical service in an existing R1 or R3 occupancy is replaced or upgraded, and the material of the water pipe in direct contact with the earth is unknown, the connection of the grounding conductor to the interior metal water pipe may be made at any accessible point, provided that at least one grounding electrode of a type specified in Sections 250.50 or 250.52 is installed as close as possible to the service and connected directly to the service equipment with an independent grounding electrode conductor.
(Ord. 0-19-1357, 11-13-2019)
25.06.11: ADDITION OF SECTION 690.19:
Notwithstanding the provisions of Section 25.06.01 , Section 690.19 is added to the Electrical Code to read as follows:
690.19 Disconnecting Means for Multiple Arrays. Where more than one array is combined to form a single output rated more than 50 volts and/or 10 amperes, a disconnecting means rated for the output shall be installed immediately adjacent to the combiner box on the output side.
Exception: If the combiner box is located adjacent to the inverter(s), the disconnecting means as stated above shall not be required.
(Ord. 0-19-1357, 11-13-2019)
25.06.12: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of the Electrical Code shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this Code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation of any provision of the Electrical Code is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
Section 7. New Article 07 Seismic Retrofit Of Unreinforced Masonry Buildings is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 07
SEISMIC RETROFIT OF UNREINFORCED MASONRY BUILDINGS
SECTION:
25.07.01: Seismic Safety Commission Draft Model Ordinance Adopted PAGE 128 of 623
25.07.02: Copies Available
25.07.03: Penalties
25.07.01: SEISMIC SAFETY COMMISSION DRAFT MODEL ORDINANCE ADOPTED:
The State of California Seismic Safety Commission Draft Model Ordinance, February 1990 Edition, as amended and in effect on November 1, 1990, is hereby adopted by reference as the Seismic Safety Ordinance of the City. (Ord. 984, 2-13-91)
25.07.02: COPIES AVAILABLE:
A copy of the Seismic Safety Commission Draft Model Ordinance, February 1990 Edition, has been deposited in the office of the City Clerk and shall be, at all times, maintained by the Clerk for the public's use and examination. (Ord. 984, 2-13-91)
25.07.03: PENALTIES:
Any person who shall violate any of the provisions of this Article or fail to comply therewith or who shall violate or fail to comply with any order made thereunder or who shall build in violation of any detailed statement of specifications or plans submitted and approved thereunder or any certificate or permit issued thereunder, and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the Planning Commission, City Council or by a court of competent jurisdiction within the time fixed herein shall severally, on each and every such violation and noncompliance, respectively, be guilty of a misdemeanor and shall be punishable as provided in Section 01.04.03A of this Code. (Ord. 984, 2-13-91) Section 8. New Article 08 Miscellaneous is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 08
MISCELLANEOUS
SECTION:
25.08.01: Building Relocation Permit
25.08.02: Building Mover's Permit
25.08.03: General Liability Insurance Coverage
25.08.04: Street Address Numbers
25.08.01: BUILDING RELOCATION PERMIT:
A. Permit Required: No person may relocate a building or structure, or any portion thereof, onto or within a site within City limits unless the person who owns or has legal control of the site has first obtained a building relocation permit as provided in this Section.
B. Application for Permit: An applicant for a building relocation permit shall complete and submit to the City an application package consisting of the following documents:
1. An application form completed and signed by the person who owns or has legal control of the site. The completed application shall include the name of the owner, the type of structure, the value and approximate age of the building, description of any alteration, repair work or other work, PAGE 129 of 623
if any, to be performed on the building after relocation and any other necessary information requested by City staff.
2. A set of working drawings, electrical and mechanical plans, complete specifications and any other documents requested by City staff which show, at a minimum, site preparation, floor plans, elevations and other construction details.
3. A set of photographs, not less than five inches by seven inches (5" x 7") in dimension, of all sides of the building showing its general architectural design and appearance.
4. An application fee in an amount set by the City Council to cover the cost to the City of issuing the permit and monitoring the relocation.
C. Hearing; Notice: Upon the filing of such application, a hearing shall be set before the Planning Commission. Notice of the time and place of such hearing and the purpose thereof shall be given by the mailing of notices to the owners of all property within three hundred feet (300') of the property to which the building or structure is to be moved. Such mailing of notices shall be completed at least ten (10) days before such hearing.
D. Findings: The Planning Commission shall not grant a building relocation permit if the Planning Commission finds that the building or structure is so old, dilapidated and in such a state of disrepair as to be unsanitary or otherwise unfit for human habitation, occupancy or use or would, by reason of its external appearance, not be compatible with the neighborhood in its new location.
Before granting approval of a proposed relocation, the applicant therefor shall affirmatively show or prove, and the Commission shall so find, that all the following conditions are met:
1. The structure is in conformity with the type and quality of buildings existing in the surrounding area of the proposed site.
2. The structure will constitute a beneficial addition to and contribute to the general development of the area.
3. The proposed relocation will not conflict with any of the property development standards of this Code.
4. The structure proposed to be relocated is completely free of pest infestation as certified by a qualified pest extermination firm.
5. The proposed relocation will in no way be detrimental to persons, to properties or to the living environment of the area.
6. That the proposed relocation will not adversely affect any streets, parkway trees or other improvements in the area.
7. The proposed relocation is consistent with the General Plan of the City.
E. Commission Action: The Commission may approve, conditionally approve or deny the request for relocation based on the evidence submitted and its own study and knowledge of the circumstances.
PAGE 130 of 623
F. Conditions of Approval: The Commission may approve a proposed relocation subject to such conditions as the Commission may deem warranted by the circumstances involved. Such conditions may include, but are not limited to, any or all of the following:
1. Dedication and improvement of streets which may include curb, gutters, sidewalk and paving.
2. A faithful performance bond guaranteeing the applicant will complete the relocation and will meet all conditions prior to occupancy. Said deposit or bond shall also be sufficient to cover the costs of all matters involving the City, such as inspections, engineering, street and other improvements, and restoration of the vacated site if located within the City.
G. Time Limits: All work will be completed within one hundred eighty (180) days after approval is granted. The Planning Commission can grant one extension of ninety (90) days if the applicant shows that circumstances beyond the control of the applicant caused the delay.
H. Permit Supplemental to Other Laws: The permit required by the provisions of this Section shall be in addition to any other permit required by any other law of the City or any governmental agency having jurisdiction.
I. Inspections: All relocated buildings or structures shall be subject to inspection by the Building and Safety Department and shall conform to all the requirements of the Building Code 1 and other codes and laws relating to buildings and construction and the necessary installations incident thereto.
J. Appeals:
1. Filing: Any person aggrieved by the decision of the Planning Commission may file an appeal to the City Council within fifteen (15) days after the date such action is taken by the Planning Commission. Such appeal shall be in writing and shall be filed with the City Clerk.
2. Review: Upon the filing of any such appeal, the City Council may either affirm the action of the Planning Commission, set the matter for a hearing de novo or request a copy of the relevant information submitted to the Planning Commission and a copy of the minutes of the Planning Commission meeting and decide the matter on the record. If a hearing de novo is held, a hearing shall be set forth before the Council. Notice of the time and place of such hearing and the purpose thereof shall be given by the mailing of notices to the owners of all property contiguous to the property to which the building or structure is to be moved. Such mailing of notices shall be completed at least ten (10) days before such hearing.
3. Determinations: If the City Council holds a hearing de novo or considers the matter on the record before the Planning Commission, the City Council shall consider the application on the standards contained in subsection D hereof.
K. Exceptions: Upon a proper showing, the City Council may modify the requirements of this Section or may waive or reduce the permit application fees where the building or structure to be moved is owned or is to be used or occupied by another public agency and is already located within the City limits or where the building or structure is so small as to not have any negative impact on surrounding properties. (Ord. 992, 7-10-91)
PAGE 131 of 623
Notes
1 1. See Article 02 of this Chapter.
25.08.02: BUILDING MOVER'S PERMIT:
A. Permit Required: No person shall move any building or structure or any portion thereof over, upon, along or across any street without first obtaining a building mover's permit.
B. Application for Permit: The applicant shall complete and submit to the Planning and Building Department an application package consisting of the following documents:
1. An application form completed and signed by the person who intends to move the building.
The completed application shall include the name of the owner, the type of structure, its present and proposed location, the fair value and approximate age of the building, the proposed route, the method of moving, impact on parkway trees, the time within which the work of moving shall be commenced and completed, proof that all the necessary authority and permits have been obtained from the public utilities which may be affected by such moving operations and any other necessary information requested by City staff.
2. That the contractor furnish the City with a policy or certificate of liability insurance in which the City is named insured. The minimum amount shall be two hundred fifty thousand dollars ($250,000.00) of property damage insurance and of personal liability insurance with a combined single amount of no less than one million dollars ($1,000,000.00). The policies shall otherwise be prepared in accordance with the latest edition of the Standard Specifications for Public Works Construction, section 7-3.
3. An application fee in an amount to be set by the City Council, from time to time, to cover the cost to the City of issuing the permit and monitoring the relocation.
4. Evidence of workers' compensation insurance.
C. Review of Application: The City Manager, the Director of Planning and BuildingCommunity Development Director and the Director of Public Works must review and approve the application. The application may be approved subject to conditions deemed necessary.
D. Permit Revocation: After the permit is issued, the Planning and Building Department shall monitor the relocation, and if any violations of the permit conditions are found, the City Manager may revoke the permit.
E. Expiration of Permit: Every building mover's permit issued pursuant to this Section shall contain each and every term and condition imposed by the City and shall be valid for a period of ninety (90) days after which it shall expire without further notice. (Ord. 992, 7-10-91)
25.08.03: GENERAL LIABILITY INSURANCE COVERAGE:
No individual or business employing any worker or possessing a State contractor's license shall be issued a building permit or an encroachment permit by the City for any building activity valued at more than two hundred dollars ($200.00) as provided for in this Code or for the encroachment upon any public right of way without having first provided written proof of possession of current PAGE 132 of 623
general liability insurance coverage in an amount and form to be established by the City Engineer 1 . (Ord. 911, 1-14-87)
Notes
1 1. West's Ann.Cal.Stats.Gov. Code §53080.5.
25.08.04: STREET ADDRESS NUMBERS:
Assigned street address numbers shall be placed or displayed on or near the front of each home or building facing the public street or thoroughfare on which it is located. Said numbers shall be arabic numerals at least three inches (3"4) high and of corresponding width. All numbers shall be placed in a location clearly visible from the street or thoroughfare after the person owning or occupying the premises shall have been notified by the Planning and Building DirectorCommunity Development Director of the appropriate street address numbers. If a public alley or thoroughfare abuts the rear of a commercial building, the street address numbers shall also be placed at the rear of the building in such a manner that they are visible from the public alley or thoroughfare. (Ord. 917, 5-13-87)
Section 9. New Article 09 Energy Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 09
ENERGY CODE
SECTION:
25.09.01: Energy Code Adopted
25.09.02: Violations
25.09.01: ENERGY CODE ADOPTED:
Except as hereinafter provided, the California Energy Code, 20252 Edition, as published by the California Building Standards Commission, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Energy Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.09.02: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of this article shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this Code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation of any provision of this article is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided.
PAGE 133 of 623
(Ord. 0-19-1357, 11-13-2019)
Section 10. New Article 10 Administrative Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 10
ADMINISTRATIVE CODE
SECTION:
25.10.01: Administrative Code Adopted
25.10.01: ADMINISTRATIVE CODE ADOPTED:
Except as hereinafter provided, the California Administrative Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Administrative Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 11. New Article 11 Floodplain Management is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 11
FLOODPLAIN MANAGEMENT
SECTION:
25.11.01: Definitions
25.11.02: Lands To Which This Article Applies
25.11.03: Basis For Establishing Flood Prone Areas
25.11.04: Compliance
25.11.05: Abrogation And Greater Restrictions
25.11.06: Interpretation
25.11.07: Warning And Disclaimer Of Liability
25.11.08: Establishment Of Development Permit
25.11.09: Duties And Responsibilities Of The Floodplain Administrator
25.11.10: Standards Of Construction
25.11.11: Standards For Subdivisions Or Other Proposed New Development
25.11.12: Standards For Utilities
25.11.01: DEFINITIONS:
Unless specifically defined in this section, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common usage and to give this article its most reasonable application.
PAGE 134 of 623
AREA OF SPECIAL FLOOD HAZARD: The land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year.
BASE FLOOD: A flood which has a one percent (1%) chance of being equaled or exceeded in any given year (also called the "100-year flood"). Base flood is the term used throughout this article.
BUILDING: Any structure.
DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.
FLOOD OR FLOODING:
A. A general and temporary condition of partial or complete inundation of normally dry land areas from: the overflow of inland or tidal waters; the unusual and rapid accumulation or runoff of surface waters from any source; or mudslides (i.e., mudflows) which are proximately caused by flooding as defined herein and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current; or
B. The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusual and unforeseeable event which results in flooding as defined in this definition.
FLOODPLAIN ADMINISTRATOR: The planning and building directorCommunity Development Director, who is hereby appointed to administer, implement, and enforce this article by granting or denying development permits in accord with its provisions.
FLOODPLAIN MANAGEMENT: The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing, where possible, natural resources in the floodplain, including, but not limited to, emergency preparedness plans, flood control works, floodplain management regulations, and open space plans.
FLOODPLAIN MANAGEMENT REGULATIONS: This article and all other provisions of this code that control development in flood prone areas, and any other federal, state, or local regulations or combination thereof which provide standards for preventing and reducing flood loss and damage.
FLOODPLAIN OR FLOOD PRONE AREA: Any land area susceptible to being inundated by water from flooding.
HISTORIC STRUCTURE: Any structure that is:
A. Listed individually in the National Register of Historic Places (a listing maintained by the department of the interior) or preliminarily determined by the secretary of the interior as meeting the requirements for individual listing on the national register; PAGE 135 of 623
B. Certified or preliminarily determined by the secretary of the interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary of the interior to qualify as a registered historic district; C. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the secretary of the interior; or D. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the secretary of the interior or directly by the secretary of the interior in states with approved programs.
NEW CONSTRUCTION: For floodplain management purposes, means structures for which the "start of construction" commenced on or after the effective date of floodplain management regulations adopted by this community, and includes any subsequent improvements to such structures.
100-YEAR FLOOD: See definition of Base Flood.
START OF CONSTRUCTION: Includes substantial improvement and other proposed new development and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within one hundred eighty (180) days from the date of the permit. The "actual start" means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the "actual start of construction" means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STRUCTURE: A walled and roofed building that is principally aboveground, or a gas or liquid storage tank.
SUBSTANTIAL DAMAGE: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT: Any reconstruction, rehabilitation, addition, or other proposed new development of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include either:
A. Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or PAGE 136 of 623
B. Any alteration of a "historic structure", provided that the alteration will not preclude the structure's continued designation as a "historic structure". (Ord. 0-06-1185, 7-12-2006)
25.11.02: LANDS TO WHICH THIS ARTICLE APPLIES:
This article shall apply to all areas identified as flood prone within the jurisdiction of the city of San Marino. (Ord. 0-06-1185, 7-12-2006)
25.11.03: BASIS FOR ESTABLISHING FLOOD PRONE AREAS:
The floodplain administrator shall obtain, review, and reasonably utilize any base flood data available from other federal or state agencies or other source to identify flood prone areas within the jurisdiction of the city of San Marino. This data will be on file at city hall, 2200 Huntington Drive, San Marino, California. (Ord. 0-06-1185, 7-12-2006)
25.11.04: COMPLIANCE:
No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the terms of this article and other applicable regulations. Violation of the requirements of this article or any conditions and safeguards imposed pursuant to this article shall constitute a misdemeanor. Nothing herein shall prevent the city council from taking such lawful action as is necessary to prevent or remedy any violation of this article. (Ord. 0-06-1185, 7-12- 2006)
25.11.05: ABROGATION AND GREATER RESTRICTIONS:
This article is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this article and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restriction shall prevail. (Ord. 0-06-1185, 7-12-2006)
25.11.06: INTERPRETATION:
In the interpretation and application of this article, all provisions shall be:
A. Considered as minimum requirements;
B. Liberally construed in favor of the city; and
C. Deemed neither to limit nor repeal any other powers granted under state statutes. (Ord. 0- 06-1185, 7-12-2006)
25.11.07: WARNING AND DISCLAIMER OF LIABILITY:
The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This article shall not make the city of San Marino, the city council, or any officer or employee of the city, the state of California, or the federal insurance administration, federal emergency management agency, liable for any flood PAGE 137 of 623
damages that result from reliance on this article or any administrative decision lawfully made hereunder. (Ord. 0-06-1185, 7-12-2006)
25.11.08: ESTABLISHMENT OF DEVELOPMENT PERMIT:
A development permit shall be obtained for all proposed construction or other development so that it may be determined whether such construction or other development is within flood prone areas. (Ord. 0-06-1185, 7-12-2006)
25.11.09: DUTIES AND RESPONSIBILITIES OF THE FLOODPLAIN ADMINISTRATOR:
The duties and responsibilities of the floodplain administrator shall include, but not be limited to, the following:
A. Permit Review: Review all development permit applications to determine whether:
1. The requirements of this article have been satisfied;
2. All other required state and federal permits have been obtained; and
3. The site is reasonably safe from flooding.
B. Review And Use Of Any Other Base Flood Data: The floodplain administrator shall obtain, review, and reasonably utilize any base flood data available from other federal or state agency or other source. (Ord. 0-06-1185, 7-12-2006)
25.11.10: STANDARDS OF CONSTRUCTION:
If a proposed building site is in a flood prone area, all new construction and substantial improvements shall:
A. Be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
B. Be constructed:
1. With materials and utility equipment resistant to flood damage;
2. Using methods and practices that minimize flood damage;
3. With electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (Ord. 0-06-1185, 7-12-2006)
25.11.11: STANDARDS FOR SUBDIVISIONS OR OTHER PROPOSED NEW DEVELOPMENT:
Any application for a subdivision or parcel map or for any other development in a flood prone area shall be reviewed to assure that:
PAGE 138 of 623
A. The development project is consistent with the need to minimize flood damage within the flood prone area;
B. All public utilities and facilities such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage; and C. Adequate drainage is provided to reduce exposure to flood hazards. (Ord. 0-06-1185, 7-12- 2006)
25.11.12: STANDARDS FOR UTILITIES:
A. All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate:
1. Infiltration of floodwaters into the systems, and
2. Discharge from the systems into floodwaters.
B. On site waste disposal systems shall be located to avoid impairment to them, or contamination from them during flooding. (Ord. 0-06-1185, 7-12-2006) Section 12. New Article 12 Fire Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 12
FIRE CODE
SECTION:
25.12.01 Fire Code Adopted
25.12.02 Amendment of Section 107.2108.2
25.12.03 Addition of Section 107.2.3108.2.3
25.12.04 Deletion of Section 111.1 112.1 and Addition of Section 111.5112.5
25.12.05 Amendment of Section 112.4113.4
25.12.06 Addition of Section 304.1.2.1
25.12.0607 Addition of Section 307.6
25.12.0708 Addition of Section 308.1.4.1
25.12.0809 Addition of Section 506.1.3
25.12.0910 Amendment of Section 903.2
25.12.1011 Amendment of Section 903.2.8.1
25.12.1112 Amendment of Section 903.2.18
25.12.1213 Addition of Section 903.3.1.3.1
25.12.1314 Amendment of Section 903.4.1
25.12.1415 Addition of Section 906.1.1
25.12.1516 Addition of Section 907.2.A
25.12.17 Amendment of Section 907.2.9.1
25.12.1618 Deletion of Section 907.6.6, Exception 3
25.12.1719 Amendment of Section 912.2
PAGE 139 of 623
25.12.18 20 Amendment of Section 3103.2
25.12.19 Addition of Section 4907.4
25.12.2021 Addition of Section 5608.2
25.12.01: FIRE CODE ADOPTED: Except as hereinafter provided, the 2022 2025 California Fire Code, including all appendices with errata, based on the 2021 2024 International Fire Code, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Fire Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. For the purpose of this Code, the Planning and Building DirectorCommunity Development Director shall be the building official.
25.12.02: AMENDMENT OF SECTION 107.2108.2: Notwithstanding the provisions of Section
25.12.01 of this article, Section 107.2108.2 of the Fire Code is hereby amended to read as follows:
107.2108.2 Establishment of Fees. All fees pursuant to the fire code shall be established by resolution of the city council.
25.12.03: ADDITION OF SECTION 107.2.3108.2.3: Notwithstanding the provisions of Section
25.12.01 of this article, Section 107.2.3108.2.3 is added to the Fire Code to read as follows:
107.2.3108.2.3 Annual Inspection Required. All properties located in the high fire hazard severity zone as identified by the San Marino Fire Department shall be inspected as deemed necessary for compliance with state and local brush clearance requirements in Section
12.12.1912.12.06 by the fire official.
25.12.04: DELETION OF SECTION 111.1112.1 AND ADDITION OF SECTION 111.5112.5: Notwithstanding the provisions of section 25.12.01 of this article, Section 111.1 of the Fire Code is deleted and Section 111.5112.5 is added to the Fire Code to read as follows:
111.5112.5 Appeals. Whenever the fire chief disapproves an application or refuses to grant a permit applied for, or when it is claimed that the provisions of the fire code do not apply or that the true intent and meaning of the fire code have been misconstrued or wrongly interpreted, the applicant may appeal the fire chief's decision to the city manager within thirty (30) days from the date of the decision. If the city manager upholds the decision of the fire chief, the applicant may appeal the decision to the city council by filing a notice of appeal with the city clerk within ten (10) days from the date of the city manager's decision.
25.12.05: AMENDMENT OF SECTION 112.4113.4: Notwithstanding the provisions of Section
25.12.01 of this article, Section 112.4113.4 of the Fire Code is amended to read as follows:
112.4113.4 Violation Penalties. Persons who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter, repair, or do work in violation of the approved construction document or directive of the fire code official, or of a permit or certificate used under provisions of this code, shall be guilty of a misdemeanor, punishable by a fine as established by the city council or by imprisonment, or both such fine and imprisonment.
Each day that a violation continues after due notice has been served shall be deemed a separate offense. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue; and all such persons shall be required to correct or remedy such violations or defects PAGE 140 of 623
in a timely manner as specified by the chief or authorized representative. The application of the above penalties shall not be held to prevent the enforced removal of prohibited conditions.
25.12.1925.12.06: ADDITION OF SECTION 4907.4304.1.2.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 4908304.1.2.1 is added to the Fire Code to read as follows:
Section 4907.4 304.1.2.1 Clearance of Hazardous Vegetation from Structures and Roads within the City of San Marino.
4907.4.1304.1.2.1.1 Statement of Legislative Intent and Purpose. It is the objective of this section to promote and protect the public health, safety and welfare by recognizing that there exists within the city of San Marino a potentially hazardous fire situation created by grass, weeds, shrubs, and trees which are in such condition and location as to provide a ready fuel supply to augment the spread or intensity of fire. It is the intent of this section to provide minimum standards to safeguard life, safety, property and the public welfare by insuring that hazardous vegetation or refuse is removed and that all grass, weeds, shrubs, and trees are properly maintained so as to not create a fire hazard within the community, while maintaining sufficient vegetation for aesthetic and soil erosion control purposes.
It is the further intent that this section apply on a year-round basis to insure the removal and/or proper maintenance of grass, weeds, shrubs, trees and refuse in order to prevent the spread or intensity of fire within the community. Of particular concern is the need to provide adequate defensible space in the urban/wildland interface area of the city, referred to as the high fire hazard severity zone. For purposes of this section, defensible space is that space within 100 feet (30.480 m) of a building or structure that is required for access by fire and other emergency personnel to defend the building or structure from the threat of fire. 4907.4.2 304.1.2.1.2 Prohibition. No person who has any ownership or possessory interest in, or control of a parcel of land shall allow to exist thereon any hazardous refuse or hazardous grass, weeds, shrubs, trees, or other vegetation, which, by reason of proximity to a building or structure, constitutes a fire hazard. For purposes of this section, hazardous grass, weeds, shrubs, trees, or other vegetation are defined as grass, weeds, shrubs, trees, or other vegetation which are in such condition and location, or by the unique characteristics of a species, as to provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.1304.1.2.1.3 Specific Requirements. In order to provide sufficient defensible space, each person who has any ownership or possessory interest in, or control of, a parcel of land shall:
4907.4.3.1304.1.2.1.3.1 General. Remove from the property all hazardous vegetation, except as otherwise provided herein, if such vegetation is within 100 feet (30.480 m) of a building, within ten (10) feet (3.048 m) of a combustible fence, or within ten (10) feet (3.048 m) of any portion of any highway, street, alley, or driveway improved or used for vehicular travel or other vehicular purposes. Distances up to 200 feet (60.960 m) or greater from a building or structure may be necessary as determined by the chief. This requirement does not apply to the maintenance of trees, ornamental shrubbery or plants which are used as ground cover, provided such are landscape materials that are properly irrigated and maintained and do not provide a ready fuel supply to augment the spread or intensity of a fire.
PAGE 141 of 623
4907.4.3.2 304.1.2.1.3.2 Adjacent To Building. Keep all trees, shrubs, and other vegetation or portions thereof, adjacent to or overhanging any building or structure free of dead limbs, branches, and other combustible matter.
4907.4.3.3 304.1.2.1.3.3 Roof Clearance. Maintain 5 feet (1.524 m) of vertical clearance between roof surfaces and portions of trees or shrubs overhanging any building or structure. 4907.4.3.4 304.1.2.1.3.4 Chimney Clearance. Remove any portion of a tree or shrub which extends within 15 feet (4.572 m) of the outlet of a chimney or stovepipe. 4907.4.3.5 304.1.2.1.3.5 Roof Surface. Maintain the roofs of all buildings or structures free of leaves, needles, twigs, and other combustible matter.
4907.4.3.6 304.1.2.1.3.6 Building Clearance--30 Feet. Maintain all hazardous grass, weeds, and small shrubs within 30 feet (9.144 m) of any building or structure. Hazardous vegetation must be maintained less than 3 inches (76 mm) high; cut grass may be left on the slope to protect the soil if it lays down within 3 inches (76 mm) of the ground. Large native shrubs may be retained no closer than an average of 18 feet (5.486 m) apart, provided the lower branches have been trimmed a minimum of 3 feet (914 mm) above the ground, or at least thinned to reduce the available fuel volume.
4907.4.3.7 304.1.2.1.3.7 Roads. Maintain trees and shrubs within 10 feet of that portion of any highway, street, alley, or driveway which is improved or used for vehicle travel or other vehicular purposes (except for designated fire roads), so that no leafy foliage, twigs, or branches are within six (6) feet (1.828 m) of the ground (but no more than 1/3 of the crown). 4907.4.3.8 304.1.2.1.3.8 Combustible Fences. Maintain all hazardous grass, weeds and other vegetation located within 10 feet (3.048 m) of any combustible fence at a height of not more than 3 inches (76 mm). This shall not require the removal of trees, ornamental shrubbery or plants which are used as ground cover, provided such do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.9304.1.2.1.3.9 Building Clearance--100 Feet. Maintain all hazardous grass, weeds, shrubs and trees within 100 feet (30.480 m) of any building or structure. Grass and small shrubs may be retained on steep slopes to stabilize the soil and prevent erosion, but may not exceed a height of 18 inches (457 mm). Large native specimen shrubs should be retained where possible, but no closer than an average of 18 feet (5.486 m) apart. Remove all dead foliage, twigs or branches, or live branches within 3 feet (914 mm) of the ground, from mature trees and shrubs (but no more than 1/3 of the crown).
4907.4.3.10 304.1.2.1.3.10 Cut Vegetation and Refuse. Remove and/or safely dispose of all cut vegetation and hazardous refuse.
4907.4.3.11304.1.2.1.3.11 Soil Erosion Control. If the abatement of hazardous vegetation results in the exposure of bare mineral soil, or the soil is exposed to such an extent that increased soil erosion would be likely, or the chief or his designee determines that the abatement has been excessive and poses a threat to the public health, safety or welfare, irrigation and landscaping or a suitable erosion control structure must be provided to establish effective soil erosion control.
PAGE 142 of 623
4907.4.3.12 304.1.2.1.3.12 Minimum Requirements. Nothing contained in this section shall be deemed to preclude the chief from requiring more than the minimum specific requirements set forth above when the chief determines that conditions exist which necessitate greater fire protection measures.
4907.5 304.1.2.1.5 Notice. The council finds that grass, weeds, shrubs, trees, or other vegetation prohibited under sec. 4908.3 increase the danger of fire and thus constitute a public nuisance. If such condition exists, the San Marino Fire Department shall give notice to the owner of record to abate the nuisance within 30 days. The notice shall state that the owner is required to abate the nuisance and that if the nuisance is not abated the city may take further action which can include, (1) the city, or its contractor, may enter upon the parcel of land and remove or otherwise eliminate or abate the nuisance, (2) that upon completion of such work the cost thereof, including administrative costs, shall become a special assessment against that parcel, and (3) that upon council confirmation of the assessment and recordation of that order, a lien shall attach to the parcel to be collected on the next regular property tax bill levied against the parcel.”
25.12.0625.12.07: ADDITION OF SECTION 307.6: Notwithstanding the provisions of Section
25.12.01 of this article, Section 307.6 is added to the Fire Code to read as follows:
307.6 Outdoor Fireplaces, Fire Pits, And Decorative Fire Features. Outdoor fireplaces, fire pits, and decorative fire features shall be installed and used in accordance with the manufacturer's instructions. Outdoor fireplaces, fire pits, and decorative fire features, as identified under this code section, shall be listed electric and/or gas fuel-fired.
25.12.0725.12.08: ADDITION OF SECTION 308.1.4.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 308.1.4.1 is added to the Fire Code to read as follows:
308.1.4.1 Open-Flame Cooking Devices. Solid fuel, gas fuel-fired barbeques and other openflame cooking devices shall be installed and used in accordance with the manufacturer's instructions. In the absence of manufacturer's instructions, the fire chief or designee has the ability to determine proper installation location clearances and area of operation.
25.12.0825.12.09: ADDITION OF SECTION 506.1.3: Notwithstanding the provisions of Section 25.12.01 of this article, Section 506.1.3 is added to the Fire Code to read as follows:
506.1.3 Key Boxes and Switches. An approved key box or switch shall be installed on all commercial properties and all residential properties where the street access to the site is gated.
25.12.0925.12.10: AMENDMENT OF SECTION 903.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2 of the Fire Code is amended to read as follows:
903.2 Where Required – All Buildings Except R-3 and U Occupancies. a. An automatic fire sprinkler system shall be installed in every new building in the city, hereinafter constructed or moved into the city, regardless of an area separation or type of construction.
Exceptions:
PAGE 143 of 623
1. New buildings less than 720 square feet may be exempt with the concurrence of the fire chief and building official.
b. Building Additions - An automatic fire sprinkler system shall be installed in the entire building when the addition, renovation, repair and/or remodeling of any existing building, when the value thereof exceeds more than fifty percent (50%) of the market value of the existing building. All such additions, renovations, repair or remodeling performed fewer than five (5) years prior to the effective date of this section shall be considered in determining the cumulative value under this section. The value of the proposed construction and of the existing building shall be determined by the building official based upon the latest edition of the "building valuation data" as published by the International Code Council (ICC).
c. Installation, approval and maintenance of automatic fire sprinkler systems shall be in compliance with the National Fire Protection Association Standards and the California Fire Code, as adopted and amended by the City. (Reference the California Fire Code chapter 80 for other adopted standards and California amendments).
d. Automatic fire and fire sprinkler systems shall be installed and maintained at the owner's expense.
e. If the fire chief and the building official determine access for fire apparatus and equipment to any building or structure, not otherwise required hereunder to install and maintain an automatic fire sprinkler system is unduly difficult, installation of an automatic fire-extinguishing system acceptable to the chief shall be required.
25.12.1025.12.11: AMENDMENT OF SECTION 903.2.8.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2.8.1 of the Fire Code is amended to read as follows:
903.2.8.1 Group R-3.
a. A fire sprinkler system shall be installed in all new buildings in the City hereinafter constructed or moved into the City.
Exceptions:
1. R-3 Occupancy Accessory Dwelling Units (ADU’s) as defined by the Government Code Section 65852.2 shall not be required to install fire sprinklers, (pursuant to AB229 and/or SB 1069) when the existing main residence is not equipped with fire sprinklers and is not required to be equipped with automatic fire sprinklers. ADU’s greater than 1,200 square feet will require fire sprinklers.
2. New buildings less than 720 square feet may be exempted with the concurrence of the fire chief and building official.
b. Existing one- and two-family dwellings shall be required to install an automatic fire sprinkler system in the existing and new portions of the building when greater than 720 square feet is added or when additions, alterations, repairs, remodels or the combination thereof exceeds 40% of the existing square footage used for human occupancy. c. Installation, approval and maintenance of automatic fire sprinkler systems shall be in compliance with the National Fire Protection Association Standards and the California Fire Code, PAGE 144 of 623
as adopted and amended by the City. (Reference the California Fire Code chapter 80 for other adopted standards and California amendments).
d. Automatic fire-extinguishing and fire sprinkler systems shall be installed and maintained at the owner's expense.
e. If the fire chief and the building official determine access for fire apparatus and equipment to any building or structure, not otherwise required hereunder to install and maintain an automatic fire sprinkler system is unduly difficult, installation of an automatic fire-extinguishing system acceptable to the chief shall be required.
25.12.1125.12.12: AMENDMENT OF SECTION 903.2.18: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2.18 of the Fire Code is amended to read as follows:
903.2.18 Group U – Private Garages, Carports, Enclosed Patios and Storage Rooms. An automatic fire sprinkler system shall be installed in "U" occupancy whenever:
a. Any portion of said "U" occupancy is located beneath any portion of a building used for human occupancy.
b. The ceiling of said "U" occupancy is located fewer than seven (7) feet above the adjacent grade.
c. The "U" occupancy is located closer than 15' to an adjacent building on the same property used for human occupancy that is required to be equipped with fire sprinklers.
25.12.1225.12.13: ADDITION OF SECTION 903.3.1.3.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.3.1.3.1 is added to the Fire Code to read as follows:
903.3.1.3.1 NFPA 13D Fire Sprinkler System Design and Installation Specifications. The following additional features and/or devices shall be incorporated into the design and installation of fire sprinkler systems in R-3/U occupancies designed per NFPA 13D and the California Fire Code Amendments.
1. A listed water flow switch with a delay feature
2. A 6” exterior bell
3. Spare sprinklers, one of each type as installed in the systems must be placed in the spare head box. The spare head box must be attached to the interior of the building.
4. Special tools as required to remove any head in the system
5. A single check valve. The water district may require additional backflow preventors.
6. The design must include 5 gpm allowance for the domestic demand.
7. The design of a hydraulically calculated fire sprinkler system shall not exceed 90% of the available water supply capacity.
8. Attics used for storage and attics equipped with fuel-burning appliances must be equipped with a “pilot” sprinkler head above the equipment and/or storage.
PAGE 145 of 623
9. A water gauge above the check valve
10. An inspectors test valve
11. Sprinklers shall be installed in any closet that contains heating and/or air conditioning equipment, a washer, a dryer and/or a water heater regardless if the equipment is electric or gas fired.
12. An “in the bucket” acceptance test must be performed flowing water in the most hydraulically demanding areas for one minute into a factory graduated container with the capacity of the anticipated flow. The discharge must flow through the orifice of the heads as installed in the compartment. The test must be conducted by the installing contractor in the presence of the fire chief or his appointee during the rough or final inspections.
13. A 200 psi hydrostatic test must be performed for two hours during the rough piping inspection. The system must be pressurized at least one hour before the scheduled time of the inspection.
14. All NFPA 13D systems must be “Looped Passive Purge Sprinkler Systems” or a listed and acceptable Back-Flow Preventer device must be installed to protect the public water supply system.
13.15. All piping materials installed in NFPA 13D sprinkler systems must be certified as meeting NSF/ANSI Standard 61.
25.12.1325.12.14: AMENDMENT OF SECTION 903.4.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.4.1 of the Fire Code is amended to read as follows:
903.4.1 All automatic sprinkler systems including those protecting single-family dwellings shall have the flow switch electrically supervised by a listed central station. Alarm, supervisory and trouble signals shall be distinctly different.
Exception: R3 Dwellings and their Accessory buildings equipped with NFPA 13D Sprinkler systems and a Household Fire Alarms System are permitted to be monitored by Remote Supervising Station, unless otherwise required by the fire chief.
25.12.1425.12.15: ADDITION OF SECTION 906.1.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 906.1.1 is added to the Fire Code to read as follows:
906.1.1 Minimum Requirement. Portable fire extinguishers of a 2A10BC type shall be installed in all occupancies and locations as set forth in the fire code and as required by the fire chief.
Exceptions:
1. Other portable fire extinguishers may be installed, if approved by the fire chief or designee.
3. Group R, division 3 and group U occupancies are exempt.
25.12.1525.12.16: ADDITION OF SECTION 907.2.A Notwithstanding the provisions of Section 25.12.01 of this article, Section 907.2.A is added to the Fire Code to read as follows:
PAGE 146 of 623
907.2.A Household Fire Alarm Required. A monitored household fire alarm system is required in all new single-family residences and accessory dwelling units that are being required to be equipped with a sprinkler system.
This required household fire alarm system is in addition of the single station smoke and carbon monoxide alarms required by the California Residential Code. The household fire alarm system shall be designed and installed in accordance with the National Fire Protection Association Standard 72. The devices installed as components of the household fire alarm system shall be installed in the following prescriptive manner:
1. A minimum of one photoelectric smoke detector on each level of living space.
2. Photoelectric smoke detectors in the hallways outside all sleeping areas.
3. A rate of rise heat detector in each accessible attic, kitchen, wok room, basements and in all “U” occupancies that are located closer than 15' to an adjacent building on the same property used for human occupancy.
4. A combination fire/security panel is permitted in R-3 and/or U occupancies. The fire alarm plans must account for the current draw of all devices in the battery calculations.
5. The household fire alarm system shall be designed to provide a local and remote signal with the following specific information for each fire alarm detection device:
1. Room and floor location.
2. Type of signal.
3. Type of device.
4. Zone identification number.
6. A minimum of one horn to sound an interior distinct fire alarm. Additional horns may be required.
7. The owner of the premises is required to maintain and have the fire alarm system supervised for the perpetuity of the building regardless if occupied.
25.12.17: AMENDMENT OF SECTION 907.2.9.1: Notwithstanding the provision of section 25.12.01 of this article, section 907.2.9.1 is amended to read as follows:
907.2.9.1 Automatic Fire Alarm System. An automatic fire alarm system that activates the occupant notification circuit in accordance with section 907.5 shall be installed in all Group R-2 occupancies, the system shall be addressable with prescriptive initiation devices.
25.12.1625.12.18: DELETION OF SECTION 907.6.6, EXCEPTION 3: Notwithstanding the provisions of Section 25.12.01 of this article, Section 907.6.6, Exception 3, of the Fire Code is deleted.
25.12.1725.12.19: AMENDMENT OF SECTION 912.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 912.2 is amended to read as follows:
PAGE 147 of 623
912.2 Fire Department connections shall be located within 150 feet of a public fire hydrant; the Fire Department connection and the fire hydrant must be located on the same side of the street of a divided road, unless otherwise approved by the fire chief.
25.12.1825.12.20: AMENDMENT OF SECTION 3103.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 3103.2 of the Fire Code is amended to read as follows:
3103.2 Approval Required. Tents and membrane structures having an area in excess of 250 square feet, shall not be erected, operated or maintained for any purpose without first obtaining a permit and approval from the fire chief.
Exceptions:
1. Tents used exclusively for recreational camping purposes.
25.12.19: ADDITION OF SECTION 4907.4: Notwithstanding the provisions of Section
25.12.01 of this article, Section 4908 is added to the Fire Code to read as follows:
Section 4907.4 Clearance of Hazardous Vegetation from Structures and Roads within the City of San Marino.
4907.4.1 Statement of Legislative Intent and Purpose. It is the objective of this section to promote and protect the public health, safety and welfare by recognizing that there exists within the city of San Marino a potentially hazardous fire situation created by grass, weeds, shrubs, and trees which are in such condition and location as to provide a ready fuel supply to augment the spread or intensity of fire. It is the intent of this section to provide minimum standards to safeguard life, safety, property and the public welfare by insuring that hazardous vegetation or refuse is removed and that all grass, weeds, shrubs, and trees are properly maintained so as to not create a fire hazard within the community, while maintaining sufficient vegetation for aesthetic and soil erosion control purposes.
It is the further intent that this section apply on a year-round basis to insure the removal and/or proper maintenance of grass, weeds, shrubs, trees and refuse in order to prevent the spread or intensity of fire within the community. Of particular concern is the need to provide adequate defensible space in the urban/wildland interface area of the city, referred to as the high fire hazard severity zone. For purposes of this section, defensible space is that space within 100 feet (30.480 m) of a building or structure that is required for access by fire and other emergency personnel to defend the building or structure from the threat of fire. 4907.4.2 Prohibition. No person who has any ownership or possessory interest in, or control of a parcel of land shall allow to exist thereon any hazardous refuse or hazardous grass, weeds, shrubs, trees, or other vegetation, which, by reason of proximity to a building or structure, constitutes a fire hazard. For purposes of this section, hazardous grass, weeds, shrubs, trees, or other vegetation are defined as grass, weeds, shrubs, trees, or other vegetation which are in such condition and location, or by the unique characteristics of a species, as to provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3 Specific Requirements. In order to provide sufficient defensible space, each person who has any ownership or possessory interest in, or control of, a parcel of land shall:
PAGE 148 of 623
4907.4.3.1 General. Remove from the property all hazardous vegetation, except as otherwise provided herein, if such vegetation is within 100 feet (30.480 m) of a building, within ten (10) feet (3.048 m) of a combustible fence, or within ten (10) feet (3.048 m) of any portion of any highway, street, alley, or driveway improved or used for vehicular travel or other vehicular purposes. Distances up to 200 feet (60.960 m) or greater from a building or structure may be necessary as determined by the chief. This requirement does not apply to the maintenance of trees, ornamental shrubbery or plants which are used as ground cover, provided such are landscape materials that are properly irrigated and maintained and do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.2 Adjacent To Building. Keep all trees, shrubs, and other vegetation or portions thereof, adjacent to or overhanging any building or structure free of dead limbs, branches, and other combustible matter.
4907.4.3.3 Roof Clearance. Maintain 5 feet (1.524 m) of vertical clearance between roof surfaces and portions of trees or shrubs overhanging any building or structure. 4907.4.3.4 Chimney Clearance. Remove any portion of a tree or shrub which extends within 15 feet (4.572 m) of the outlet of a chimney or stovepipe. 4907.4.3.5 Roof Surface. Maintain the roofs of all buildings or structures free of leaves, needles, twigs, and other combustible matter.
4907.4.3.6 Building Clearance--30 Feet. Maintain all hazardous grass, weeds, and small shrubs within 30 feet (9.144 m) of any building or structure. Hazardous vegetation must be maintained less than 3 inches (76 mm) high; cut grass may be left on the slope to protect the soil if it lays down within 3 inches (76 mm) of the ground. Large native shrubs may be retained no closer than an average of 18 feet (5.486 m) apart, provided the lower branches have been trimmed a minimum of 3 feet (914 mm) above the ground, or at least thinned to reduce the available fuel volume.
4907.4.3.7 Roads. Maintain trees and shrubs within 10 feet of that portion of any highway, street, alley, or driveway which is improved or used for vehicle travel or other vehicular purposes (except for designated fire roads), so that no leafy foliage, twigs, or branches are within six (6) feet (1.828 m) of the ground (but no more than 1/3 of the crown). 4907.4.3.8 Combustible Fences. Maintain all hazardous grass, weeds and other vegetation located within 10 feet (3.048 m) of any combustible fence at a height of not more than 3 inches (76 mm). This shall not require the removal of trees, ornamental shrubbery or plants which are used as ground cover, provided such do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.9 Building Clearance--100 Feet. Maintain all hazardous grass, weeds, shrubs and trees within 100 feet (30.480 m) of any building or structure. Grass and small shrubs may be retained on steep slopes to stabilize the soil and prevent erosion, but may not exceed a height of 18 inches (457 mm). Large native specimen shrubs should be retained where possible, but no closer than an average of 18 feet (5.486 m) apart. Remove all dead foliage, twigs or branches, or live branches within 3 feet (914 mm) of the ground, from mature trees and shrubs (but no more than 1/3 of the crown).
PAGE 149 of 623
4907.4.3.10 Cut Vegetation and Refuse. Remove and/or safely dispose of all cut vegetation and hazardous refuse.
4907.4.3.11 Soil Erosion Control. If the abatement of hazardous vegetation results in the exposure of bare mineral soil, or the soil is exposed to such an extent that increased soil erosion would be likely, or the chief or his designee determines that the abatement has been excessive and poses a threat to the public health, safety or welfare, irrigation and landscaping or a suitable erosion control structure must be provided to establish effective soil erosion control. 4907.4.3.12 Minimum Requirements. Nothing contained in this section shall be deemed to preclude the chief from requiring more than the minimum specific requirements set forth above when the chief determines that conditions exist which necessitate greater fire protection measures. 4907.5 Notice. The council finds that grass, weeds, shrubs, trees, or other vegetation prohibited under sec. 4908.3 increase the danger of fire and thus constitute a public nuisance. If such condition exists, the San Marino Fire Department shall give notice to the owner of record to abate the nuisance within 30 days. The notice shall state that the owner is required to abate the nuisance and that if the nuisance is not abated the city may take further action which can include, (1) the city, or its contractor, may enter upon the parcel of land and remove or otherwise eliminate or abate the nuisance, (2) that upon completion of such work the cost thereof, including administrative costs, shall become a special assessment against that parcel, and (3) that upon council confirmation of the assessment and recordation of that order, a lien shall attach to the parcel to be collected on the next regular property tax bill levied against the parcel.”
25.12.2025.12.21: ADDITION OF SECTION 5608.2: Notwithstanding the provisions of Section
25.12.01 of this article, Section 5608.2 is added to the Fire Code to read as follows:
5608.2 The manufacturing, possession, storage, sale, use and handling of fireworks, other than "safe and sane" fireworks, is prohibited. The display, use or sale of fireworks described as "safe and sane" by the state fire marshal, is prohibited.
Exceptions:
1. Storage of fireworks is allowed in accordance with the requirements for low order explosives in title 19, California code of regulations, chapter 10.
2. Use and handling of fireworks for professional display by a state licensed pyrotechnician in accordance with title 19, California code of regulations, chapter 6, if permitted by the fire chief.
Section 13. New Article 13 Green Building Standards Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 13
GREEN BUILDING STANDARDS CODE
SECTION:
25.13.01: Green Building Standards Code Adopted
25.13.02: Addition Of Section 101.12
25.13.03: Amendment Of Section 202
PAGE 150 of 623
25.13.04: Amendment Of Section 301.1
25.13.05: Amendment Of Section 301.1.1
25.13.06: Amendment Of Section 5.408.3
25.13.07: Amendment Of Section 601.1
25.13.08: Violations
25.13.01: GREEN BUILDING STANDARDS CODE ADOPTED:
Except as hereinafter provided, the mandatory measures of the California Green Building Standards Code, 20252 Edition, as published by the California Building Standards Commission, are hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Green Building Standards Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.13.02: ADDITION OF SECTION 101.12:
Notwithstanding the provisions of section 25.13.01 of this article, section 101.12 is added to the Green Building Standards Code to read as follows.
101.12 Fee for Mandatory Measures. The fee for each plan check/permit shall be as periodically established by City Council resolution.
(Ord. 0-19-1357, 11-13-2019)
25.13.03: AMENDMENT OF SECTION 202:
Notwithstanding the provisions of section 25.13.01 of this article, section 202 of the Green Building Standards Code is amended by adding a definition to read as follows:
SUSTAINABILITY. Consideration of present development and construction impacts on the community, the economy, and the environment without compromising the needs of the future. (Ord. 0-19-1357, 11-13-2019)
25.13.04: AMENDMENT OF SECTION 301.1:
Notwithstanding the provisions of section 25.13.01 of this article, section 301.1 of the Green Building Standards Code is amended to read as follows:
301.1 Scope. Buildings shall be designed to include the green building measures specified as mandatory this code. Voluntary green building measures are also included in this code the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless they are adopted by a city or county as specified in Section 101.7.
(Ord. 0-19-1357, 11-13-2019)
25.13.05: AMENDMENT OF SECTION 301.1.1:
PAGE 151 of 623
Notwithstanding the provisions of section 25.13.01 of this article, section 301.1.1 of the Green Building Standards Code is amended to read as follows:
Section 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings. Code sections relevant to additions and alterations shall only apply to the portions of the building being added or altered within the scope of the permitted work.
(Ord. 0-19-1357, 11-13-2019)
25.13.06: AMENDMENT OF SECTION 5.408.3:
Notwithstanding the provisions of section 25.13.01 of this article, section 5.408.3 of the Green Building Standards Code is amended to read as follows:
5.408.3 Excavated soil and land clearing debris [BSC] 100 percent of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled.
For a phased project, such material may be stockpiled on site until the storage site is developed.
Exception: Reuse, either on-or off-site, of vegetation or soil contaminated by disease or pest infestation.
Notes:
1. If contamination by disease or pest infestation is suspected, contact the County Agricultural Commissioner and follow its direction for recycling or disposal of the material. (www.cdfa.ca.gov/exec/county/ county_contacts.html)
2. For a map of known pest and/or disease quarantine zones, consult with the California Department of Food and Agriculture. (www.cdfa.ca.gov)
3. Contaminated soil shall not be reused and shall be disposed of or remediated in accordance with relevant regulations.
(Ord. 0-19-1357, 11-13-2019)
25.13.07: AMENDMENT OF SECTION 601.1:
Notwithstanding the provisions of section 25.12.01 of this article, section 601.1 is added to the Green Building Standards Code to read as follows:
601.1. This section lists the organization and standards that are referenced in various sections of this document. The standards are listed herein by the promulgating agency of the standard. (Ord. 0-19-1357, 11-13-2019)
25.13.08: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of this article shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation PAGE 152 of 623
of any provision of this article is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided.
(Ord. 0-19-1357, 11-13-2019)
Section 14. New Article 14 Reference Standards Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 14
REFERENCED STANDARDS CODE
SECTION:
25.14.01: Referenced Standards Code Adopted
25.14.01: REFERENCED STANDARDS CODE ADOPTED:
Except as hereinafter provided, the California Referenced Standards Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Referenced Standards Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 15. New Article 15 Small Residential Rooftop Solar Energy Systems is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 15
SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS
SECTION:
25.15.01: Expedited Permitting Of Small Residential Rooftop Solar Energy Systems
25.15.01: EXPEDITED PERMITTING OF SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS:
A. Small Residential Rooftop Solar Energy System Defined: "Small residential rooftop solar energy system" shall have the same meaning as provided in the solar rights act, Government Code section 65850.5(j)(3), as the same may be amended from time to time.
B. Small Residential Rooftop Solar Energy System Standard Plan And Permit Application Checklist:
1. The city shall adopt standard plans and a checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. The small residential rooftop solar energy system standard plans and checklist shall substantially conform to recommendations for expedited permitting, including the checklist and standard plans, contained in the most current version of the "California Solar Permitting Guidebook" adopted by the governor's office of planning and research.
PAGE 153 of 623
2. All documents required for the submission of a small residential rooftop solar energy system permit application, the standard plan(s), and checklist shall be made available on the publicly accessible city website.
3. Electronic submittal of the required permit application and documents by e-mail or facsimile shall be available to all small residential rooftop solar energy system permit applicants.
An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature. Electronic permit applications shall be submitted through the method of electronic submittal specified by the building official.
C. Permit Application Review:
1. An application that satisfies the information requirements in the checklist(s) and standard plans shall be deemed complete.
2. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission.
3. The building official shall issue a building permit the same day for over the counter applications, or within one to three (3) business days for electronic applications, upon receipt of a complete application that meets the requirements of the city's standard checklist and plan(s), or as soon thereafter as may be practicable. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements.
4. Any condition imposed on a permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
D. Inspection Requirements:
1. Inspection requests may be submitted by e-mail or facsimile.
2. Only one inspection shall be required for small residential rooftop solar energy systems eligible for expedited review.
3. The inspection shall be done in a timely manner. The building official shall strive to schedule an inspection within two (2) business days of a request and provide a two (2) hour inspection window.
4. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this section. (Ord. 0-15-1298, 9-9-2015) Section 16. New Article 16 Appendix J Los Angeles County Grading Standards is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 16
APPENDIX J LOS ANGELES COUNTY GRADING STANDARDS
SECTION:
25.16.01: Appendix J Los Angeles County Grading Standards Code Adopted PAGE 154 of 623
25.16.01: APPENDIX J LOS ANGELES COUNTY GRADING STANDARDS CODE ADOPTED:
Except as hereinafter provided, the Los Angeles County Appendix J Standards Code, 2019 2022 Edition, as published by the Los Angeles County Department of Public Works, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Los Angeles County Appendix J Grading Standards Code of the City. A copy of said Code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019)
Section 17. New Article 17 Existing Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 17
EXISTING BUILDING CODE
SECTION:
25.17.01 Existing Building Code Adopted
25.17.01: EXISTING BUILDING CODE ADOPTED:
Except as hereinafter provided, the California Existing Building Code, 20252 edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the historic building code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 18. New Article 18 Historical Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 18
HISTORICAL BUILDING CODE
SECTION:
25.18.01 Historical Building Code Adopted
25.18.01: HISTORICAL BUILDING CODE ADOPTED:
Except as hereinafter provided, the California Historical Building Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Historical Building Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
PAGE 155 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) SECTION 18. PUBLICATION
The Mayor shall sign and the City Clerk shall attest to the adoption of this Ordinance and shall cause the same to be published as required by law.
SECTION 19. EFFECTIVE DATE
This ordinance shall take effect 30 days following publication by title and summary.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the City Council of the City of San Marino held on September 26, 2025.
_____________________________________
GRETCHEN SHEPHERD ROMEY,
MAYOR
ATTEST:
_________________________
CITY CLERK
ALISON WALKER
APPROVED AS TO FORM:
_________________________
JOSEPH MONTES
CITY ATTORNEY
PAGE 156 of 623
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF SAN MARINO )
I HEREBY CERTIFY that the foregoing Ordinance No. O-25-1421, was introduced at a Regular Meeting of the City Council held on the 10th day of September, 2025, and was approved and adopted at a Regular Meeting of the City Council held on the 26th day of September, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________________
ALISON WALKER
CITY CLERK
PAGE 157 of 623
RESOLUTION NO. R-25-23
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SAN MARINO ADOPTING FINDINGS OF NECESSITY
AND NEED FOR AMENDMENTS, DELETIONS, AND
ADDITIONS TO THE 2025 CALIFORNIA BUILDING
STANDARDS CODE BASED ON LOCAL CLIMATIC,
GEOLOGICAL OR TOPOGRAPHICAL CONDITIONS
WHEREAS, Sections 17958 and 18941.5 of the California Health and Safety Code provide that the City may make such changes or modifications to building standards set forth in codes comprising the 2025 California Building Standards Codes and the 2022 Los Angeles County Code, Appendix J - Grading Standards as it determines are reasonably necessary because of local climatic, geological or topographical conditions.
WHEREAS, Ordinance No. O-25-1421 adopts the 2025 editions of the California Building, Residential, Plumbing, Mechanical, Electrical, Fire, Energy, Historical, Existing, Administrative, Green Building Standards, and Referenced Standards Codes and the 2022 Los Angeles County Appendix J - Grading Standards, including minor modifications to building standards and other provisions contained in said codes.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MARINO HEREBY FINDS, DETERMINES, ORDERS AND RESOLVES AS FOLLOWS:
SECTION 1. Findings supporting local amendments. The modifications to Codes comprising the 2025 California Building Standards Code and the 2022 Los Angeles County Grading Standards that have been enacted are a continuation of the San Marino Building Code.
The City Council expressly finds that all of the changes and modifications to such Codes, whether previously enacted or enacted in this ordinance, are reasonably necessary because of local climate characterized by hot, dry summers, followed by strong Santa Ana winds and heavy winter rains, the location in Southern California, the relatively flat topography of the City and the location of the Raymond fault within the City.
A. Specifically, the City Council hereby finds that the modifications to the California Building Code regarding the amendment to the California Fire Code, fire sprinkler system (Section 903.2), fire alarm system (Section 907.2), are reasonably necessary to the health, safety and general welfare of the residents of the City due to the following local climatic, topographic and geological condition:
1. The City is located in an area climatically classified as arid and prone to hot, dry Santa Ana winds of high velocity. Santa Ana winds are unique to this region of Southern California. Moreover, due to the arid nature of the area, the weather during Santa Ana conditions tends to be hot, dry and windy. The hot, dry and windy weather conditions are very hazardous to populated areas insofar as flame spread is concerned.
PAGE 158 of 623
CITY OF SAN MARINO RESOLUTION NO. R-25-23
PAGE 2 OF 4
2. Because of the above-described climatic conditions, the City and the surrounding cities have historically suffered from occasional structural fires.
These have often been difficult to control due to the relatively flat topography of the City and the dry winds carrying sparks and cinders to surrounding structures.
3. The City is located in a seismically active area, bisected by the Raymond Fault, and it is reasonably foreseeable that an earthquake would render the City particularly vulnerable to devastation.
4. Because of the above-described geological conditions, the City, in the event of an earthquake, may be unable to dispatch an adequate number of fire personnel with apparatus to suppress fires and conduct rescue operations.
Moreover, the conditions within the City likewise occur in surrounding communities, thereby rendering mutual aid assistance problematic.
B. The City Council hereby further finds that the selected recommended technical amendments and additions to the 2025 California Building and Residential Codes from the Los Angeles Regional Uniform Code Program (Fire Code Sections 903.2 and 907.2) are reasonably necessary for the health, safety, and general welfare of the residents of the City resulting from the following geological condition:
1. The City is located in a seismically active area, bisected by the Raymond Fault, and among a vast array of other fault systems capable of producing major earthquakes. It is reasonably foreseeable that an earthquake would render the City particularly vulnerable to devastation.
2. Because of the above-described climatic conditions, the City and the surrounding cities have historically suffered from occasional structural fires.
These have often been difficult to control due to the relatively flat topography of the City and the dry winds carrying sparks and cinders to surrounding structures.
C. The City Council hereby further finds that the other modifications to the 2025 California Codes and the addition of the 2022 Los Angeles County Code Appendix J Grading Standards are administrative or procedural in nature and necessary to allow the application of such codes by procedures suited to the size and nature of the City and its staff. The changes made also include provisions to make each of said Codes consistent with other Codes enforced by the City.
D. The City Council hereby further finds that the modifications to the 2025 Plumbing, Mechanical, Electrical, Energy, and Green Building Code Standards are administrative or procedural in nature and necessary to allow the application of such PAGE 159 of 623
CITY OF SAN MARINO RESOLUTION NO. R-25-23
PAGE 3 OF 4
codes by procedures suited to the size and nature of the City and its staff. The changes made also include provisions to make each of said Codes consistent with other Codes enforced by the City.
E. The City Council hereby further finds that the 2025 Historical and Existing Code Standards are administrative or procedural in nature and necessary to allow the application of such codes by procedures suited to the size and nature of the City and its staff. The changes made also include provisions to make each of said Codes consistent with other Codes enforced by the City such as Chapter 23 Article 18, Historic Preservation.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified copy of the same and Ordinance No. O-25-1421 to be forthwith transmitted to the California Building Standards Commission.
PASSED, APPROVED, AND ADOPTED this 26th day of September, 2025. ___________________________________
GRETCHEN SHEPHERD ROMEY
MAYOR
ATTEST:
________________________
ALISON WALKER
CITY CLERK
PAGE 160 of 623
CITY OF SAN MARINO RESOLUTION NO. R-25-23
PAGE 5 OF 4
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SAN MARINO )
I, ALISON WALKER, City Clerk of the City of San Marino, California, hereby certify that Resolution No. R-25-23 was adopted by the City Council of the City of San Marino at a Regular Adjourned Meeting held on the 26th day of September, 2025, and that the same was adopted by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________
ALISON WALKER
CITY CLERK
PAGE 161 of 623
ORDINANCE NO. O-25-1423-U
AN URGENCY ORDINANCE OF THE CITY OF SAN MARINO
ADOPTING BY REFERENCE THE 2025 EDITIONS OF THE
CALIFORNIA ADMINISTRATIVE, BUILDING, MECHANICAL,
PLUMBING, ELECTRICAL, RESIDENTIAL, FIRE, ENERGY, GREEN
BUILDING STANDARDS, HISTORICAL BUILDING, EXISTING
BUILDING, APPENDIX J LOS ANGELES COUNTY GRADING
STANDARDS AND REFERENCED STANDARDS CODES, WITH
CERTAIN AMENDMENTS, DELETIONS AND ADDITIONS, AND
AMENDING CHAPTER 25 OF THE SAN MARINO MUNICIPAL CODE
THE CITY COUNCIL OF THE CITY OF SAN MARINO DOES ORDAIN
AS FOLLOWS:
SECTION 1. RECITALS
WHEREAS, the City Council of the City of San Marino does hereby find that there is a need to enforce the most current editions of the California Building Standards Code, with local amendments thereof, as recited herein for regulating and controlling the design, erection, construction, enlargement, installation, alteration, repair, relocation, removal, use and occupancy, demolition, conversion, height and area, location and maintenance, and quality of materials of all buildings and structures and plumbing, mechanical, electrical and fire suppression systems and certain equipment within the City; and
WHEREAS, The City of San Marino is located in an area subject to climatic conditions with long periods of low humidity and hot weather, combined with unpredictable seasonal Santa Ana high wind conditions resulting in increased exposure to fire risk; and WHEREAS, AB130, adopted June 30, 2025, prohibits the imposition of additional building standards on housing starting October 2025, so any new standards must be in effect prior to October. The standards set forth in this Ordinance relate to the public health, safety and welfare and so adoption on an urgency basis is needed to protect the public in connection with new construction activity which may occur in the future; and WHEREAS, the City Council does hereby further find that in accordance with section 15061(b)(3) of the California Code of Regulations, the adoption of these local amendments to the California Building Standards Code, and amendments to the San Marino Municipal Code are exempt from the provisions of the California Environmental Quality Act because such actions are administrative in nature; and
WHEREAS, the City Council does hereby further find that in accordance with section15061 (b)(3) of the California Code of Regulations, the adoption of these local amendments to the California Building Standards Code, and amendments to the San Marino Municipal Code are exempt from the provisions of the California Environmental Quality Act because such actions are largely administrative in nature, are designed to improve and not degrade environmental quality, PAGE 162 of 623
and the impacts of these local amendments to the building standards code will not adversely affect the environment in any manner that could be significant.
Section 1. Articles 02 through 06, 09, 10, 12, 13, and 14 of Chapter 25, the “Uniform Codes” of the San Marino City Code, adopting by reference the 2016 Editions of the California Building, Mechanical, Plumbing, Electrical, Energy, Green Building Standards, Appendix J Los Angeles County Grading Standards, Referenced Standards, and Fire Codes, and amendments thereto, are hereby repealed; provided, however, that such repeal shall not affect or excuse any violation of any of said codes occurring prior to the effective date of this ordinance.
Section 2. New Article 02 Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows with additions identified in red font:
CHAPTER XXV
UNIFORM CODES
ARTICLE 01
GENERAL PROVISIONS
SECTION:
25.01.01: Permits Required
25.01.02: Times Construction Prohibited
25.01.03: Work By Owner Permitted
25.01.04: Penalty For Violations
25.01.05: Property Owner Responsible
25.01.06: Property Maintenance Standards For Construction Projects
25.01.07: Expedited Electric Vehicle Charging Station Permitting
25.01.08: Definitions
25.01.09: Limitation On Authority - Board Of Appeals
25.01.10: Adoption Of Administrative Regulations
25.01.01: PERMITS REQUIRED:
It shall be unlawful for any person to begin or perform any construction work or construction activity or to cause or permit any construction work or construction activity, for which a permit is required by this chapter, to begin or perform on any residential or commercial parcel of property without having first obtained said permit. (Ord. 092-1015, 6-10-1992)
25.01.02: TIMES CONSTRUCTION PROHIBITED:
It shall be unlawful for any person to perform or to cause or permit to be performed any construction work or construction activity for which a permit is required by this chapter or for any person requiring a business license pursuant to chapter XI of this Code to perform or to cause or permit to be performed any construction work or construction activity on the following days: (Ord. 092-1015, 6-10-1992)
A. On Mondays through Fridays, before seven o'clock (7:00) A.M. and after six o'clock (6:00) P.M.; except, that the Director of Planning and BuildingCommunity Development Director may authorize, in connection with seismic upgrading or fire sprinkler installation, construction work or PAGE 163 of 623
activity in the C-1 Zone to be performed outside between six o'clock (6:00) P.M. and nine o'clock (9:00) P.M. and inside an enclosed building after nine o'clock (9:00) P.M. Such construction work or activity shall be performed in compliance with any conditions the Director of Planning and BuildingCommunity Development Director shall impose to alleviate potential disturbance to surrounding properties.
B. On Saturdays, before nine o'clock (9:00) A.M. and after four o'clock (4:00) P.M.; except, that the Director of Planning and BuildingCommunity Development Director may authorize, in connection with seismic upgrading or fire sprinkler installation, construction work or activity in the C-1 Zone to be performed outside between four o'clock (4:00) P.M. and nine o'clock (9:00) P.M. and inside an enclosed building after nine o'clock (9:00) P.M. Such construction work or activity shall be performed in compliance with any conditions the Director of Planning and BuildingCommunity Development Director shall impose to alleviate potential disturbance to surrounding properties. (Ord. 092-1027U, 8-12-1992)
C. Sundays.
D. The following holidays:
New Year's Day
Presidents' Day
Memorial Day
Fourth of July
Labor Day
Veterans Day
Thanksgiving
The Friday after Thanksgiving
Christmas Eve
Christmas Day
New Year's Eve
If any of the above holidays fall on a Saturday, construction work and construction activity shall be prohibited on the preceding Friday. If any of the above holidays fall on a Sunday, construction work and construction activity shall be prohibited on the following Monday.
This section shall not apply to the emergency repairs necessary for health, safety or preservation of property. (Ord. 092-1015, 6-10-1992)
25.01.03: WORK BY OWNER PERMITTED:
The owner or occupant of property within the City may perform construction activity or construction work during the times described in section 25.01.02 of this article, provided that the property owner or occupant performs the work himself. (Ord. 092-1015, 6-10-1992) PAGE 164 of 623
25.01.04: PENALTY FOR VIOLATIONS:
Any person who violates or causes or permits any person to violate section 25.01.01 of this article shall be required, at the time of obtaining the permits required by this chapter, to pay a penalty equal to one hundred percent (100%) of the total amount of all permit fees assessed for the construction work or activity pursuant to this chapter in addition to the amount of the permit fees. (Ord. 092-1015, 6-10-1992; amd. Ord. 097-1107, 9-10-1997; Ord. 0-18-1335, 4-11-2018)
25.01.05: PROPERTY OWNER RESPONSIBLE:
The property owner or occupant of any property at which a violation of this chapter shall occur shall be responsible for and liable for charges provided for in section 25.01.04 of this article. (Ord. 092-1015, 6-10-1992; amd. Ord. 097-1107, 9-10-1997; Ord. 0-18-1335, 4-11-2018)
25.01.06: PROPERTY MAINTENANCE STANDARDS FOR CONSTRUCTION PROJECTS:
All projects, for which a valid building permit has been issued, with exception of interior remodels, shall be required to adhere to the following maintenance standards and no building or planning inspections shall be completed until all such applicable items are addressed:
A. One sign, visible from the street, must be posted, listing a contact name, company, and phone number. Said sign may be attached to a construction fence and must be six (6) square feet in area and no greater than thirty six inches (36") in length. No other signs shall be permitted in connection with the project.
B. Construction materials, equipment, storage bins, and portable facilities must be screened from public view.
C. Construction fencing must be installed on the site of any residential or commercial structure that is being, in whole or in part, demolished or reconstructed. Construction fencing must be installed in a manner that fully screens and secures the construction site. Construction fencing must include an opaque, dark-green screening material that is tightly secured to the fencing, free of holes and without advertising, except as allowed under subsection A of this section. The Director of Planning and BuildingCommunity Development Director, in his or her sole discretion, may require construction fencing on any other type of construction sites and may allow landscaping to substitute for some or all of the construction fencing. Construction fencing and any other approved screening material must be maintained in good condition.
D. A portable toilet shall be placed in the rear of the property with a minimum setback of ten feet (10') from side yard and rear yard property lines. If existing conditions prohibit access for the drop-off or the servicing of the portable toilet, the unit can be placed in the front yard provided the unit is placed no further than five feet (5') from the front of the house and ten feet (10') from any side property lines. The door opening shall not face either the street or an adjacent property and shall remain closed at all times. The portable toilet shall be screened from public view at all times.
No more than one toilet shall be used per property. The portable toilet shall be serviced a minimum of twice a week.
E. Roll-off containers shall be in good condition and appearance and emptied on a regular basis.
Containers shall be placed on private property unless an encroachment permit is obtained.
PAGE 165 of 623
F. All construction equipment, storage bins and portable toilets shall be kept free of graffiti.
G. Construction materials, equipment, storage bins or debris shall not be placed on public property unless an encroachment permit has first been granted for such placement from Planning and Building and the Public Works Department. Conditions may be imposed to ensure appropriate safety signage, insurance and bonds.
H. Any dirt or debris tracked onto streets and sidewalks shall be removed immediately. All trash and litter on the job site shall be removed from public view on a daily basis.
I. Construction worker vehicles, equipment, and gate fencing shall not block public sidewalks.
J. Existing landscaping shall be maintained in good condition, including the City parkway area.
The property owner or contractor shall be responsible for mowing, trimming, weeding, and irrigating these areas as needed throughout the duration of the construction project.
K. A waste management form/plan shall be submitted at plan check and project final whenever the scope of work proposes a residential addition of one thousand (1,000) square feet or more; new construction of one thousand (1,000) square feet or more; a demolition project of one thousand (1,000) square feet or more, or tenant improvement projects of three thousand (3,000) square feet or more.
L. A tree protection plan shall be submitted at plan check where any construction activity takes place within the drip line of the canopy of any established tree or any tree in the City parkway. A separate cut sheet shall also be submitted identifying all established trees on the property. The tree protection plan must be prepared by either a registered consulting arborist or a certified arborist with the International Society of Arborists. Prior to any demolition or construction, a registered project arborist must provide the City with written certification of compliance with the tree protection plan. After any demolition or construction, a registered project arborist must provide the City a written inspection report regarding the effectiveness of the measures in the tree protection plan.
M. Sandbags, silt screens, or any similar methods are required to be installed on all projects during the rainy season (October - April) to prevent dirt, mud, and debris from flowing into the storm drain system. This shall be required only when the front yard landscaping is either removed or modified, regardless whether such removal or modification was intended as part of the construction project.
N. A Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Planning and Building Department during the plan check process for all projects which disturb one or more acres of soil or whose projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres. Projects include soil excavation, soil grading or other construction activities where soil may be displaced during weather events or landscape water run-off. (Ord. 0-18-1337, 10-10-2018)
25.01.07: EXPEDITED ELECTRIC VEHICLE CHARGING STATION PERMITTING:
A. Purpose: The purpose of this section is to provide for expedited processing of applications for electric vehicle charging stations in compliance with Government Code section 65850.7.
PAGE 166 of 623
B. Definitions: The following definitions shall apply for purposes of this section:
ELECTRIC VEHICLE CHARGING STATION OR CHARGING STATION: Means any level of electric vehicle supply equipment station that is designed and built in compliance with article 625 of the California Electric Code, as it read on January 1, 2016, and delivers electricity from a source outside of an electric vehicle into a plug-in electric vehicle.
ELECTRONIC SUBMISSION: Means a submission of an application utilizing email, the internet, and/or facsimile transmission.
SPECIFIC, ADVERSE IMPACT: Means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date an application was deemed complete.
C. Expedited Review Process:
1. The building official shall adopt a checklist of all application requirements for expedited building permits for electric vehicle charging stations. The checklist shall substantially conform to the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" found in the "Zero-Emission Vehicles in California: Community Readiness Guidebook" published by the Governor's Office of Planning and Research. The checklist, application form, and any other documents required by the building official to process an application shall be published on the City's website.
2. Anyone seeking to install an electric vehicle charging station at any site within the City may apply to the building official for an expedited nondiscretionary building permit.
3. An application for an expedited building permit for an electric vehicle charging station and all associated documentation may be submitted to the building official in person, by mail, or by electronic submission. Electronic signatures may be used in lieu of wet signatures.
4. An application that, in the opinion of the building official, satisfies the information requirements of the checklist adopted by the City shall be deemed complete.
5. If an application for an expedited building permit is deemed incomplete, the building official shall provide a written correction notice of the deficiencies and the additional information required to complete the application.
6. If the building official determines that an application for an expedited building permit is complete, the building official shall process the application. If the building official determines that the proposed charging station meets all health and safety requirements of State and Federal law, and would not have a specific, adverse impact upon the public health or safety, the application shall be approved and a building permit shall be issued.
7. If the building official finds, based on substantial evidence, that a proposed charging station could have a specific, adverse impact upon the public health or safety, the applicant must apply for an electric vehicle charging station use permit in order to install the proposed charging station.
8. An application for an electric vehicle charging station use permit shall be reviewed by the building official. The building official shall not deny such an application without making written findings, based upon substantial evidence in the record, that the proposed charging station would PAGE 167 of 623
have a specific, adverse impact upon the public health or safety which could not feasibly be satisfactorily mitigated or avoided. The written findings required for rejection of an electric vehicle charging station use permit application shall include the building official's basis for rejecting any potentially feasible alternatives that could mitigate or prevent the alleged adverse impact. Pursuant to Government Code section 65850.7, the building official's review shall be limited to health and safety issues. Aesthetic concerns, or other items not related to public health or safety shall not be considered.
9. A decision of the building official made pursuant to subsections C1 through C8 of this section may be appealed to the Planning Commission. The Planning Commission's review shall be subject to the same limitations as that of the building official, and only health and safety issues may be considered.
10. Any condition imposed on an application for an expedited building permit or electric vehicle charging station use permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
D. No Requirement For Association Approval: Consistent with Government Code section 65850.7, the building official shall not condition the approval for any electric vehicle charging station permit on the approval of such a system by a homeowners association, as that term is defined by Civil Code section 4080. (Ord. 0-17-1329, 10-11-2017; amd. Ord. 0-18-1335, 4-11- 2018)
25.01.08: DEFINITIONS:
The following definitions shall apply to all structures that are regulated by this chapter. If in conflict with other provisions of this Code, these definitions shall control.
APPLICANT: Shall mean an owner or other responsible person who applies for a building or other permit under this chapter, or an extension thereof.
INCOMPLETE STRUCTURE: Shall mean a structure, or portion thereof, for which a building permit under article 2 of this chapter, or an extension thereof, has expired. "Incomplete structure" shall also include those structures for which issued permits under articles 3 through 6 and 12 of this chapter, and any extensions thereof, have expired.
JUSTIFIABLE CAUSE: As used in sections 105.5.1 and 105.5.4 of the Building Code, and sections R105.5.1 and R105.5.4 of the Residential Code, shall mean or refer to a delay in performance of work or installations under an active permit that is due to war, insurrection, floods, earthquakes, fires, casualties, epidemics, quarantine restrictions, unusually severe weather, strikes causing inability to secure necessary labor, materials or tools, acts of the City, or any other delays that are beyond the control and without the fault of the permit holder.
OWNER: Shall mean and include any person having legal title to, or who leases, rents, occupies or has charge, control or possession of, any real property in the City, including all persons shown as owners on the last equalized assessment roll of the Los Angeles County Assessor's Office.
Owners include persons with powers of attorney, executors of estates, trustees, or who are courtappointed administrators, conservators, guardians or receivers.
PAGE 168 of 623
COMMUNITY DEVELOPMENT DIRECTOR AND/OR PLANNING AND BUILDING DIRECTOR: Shall mean the building official, or a designee thereof.
PROJECT: Shall mean an action or actions for which one or more permits are required by this chapter that concern a building or structure, or a portion thereof, with regard to construction, enlargement, alteration, repair, movement or demolition, and/or the erection, installation, enlargement, alteration, repair, removal, conversion or replacement of any electrical, fire- related, gas, mechanical or plumbing system, or portion thereof.
RESPONSIBLE PERSON: Shall mean any person, whether as an owner as defined in this section, or otherwise, who allows, causes, creates, maintains, suffers, or permits a public nuisance, or any violation of this chapter or other portion of this Code to exist or continue, by any act or the omission of any act or duty. A responsible person shall also include employees, principals, joint venturers, officers, agents, and/or other persons acting in concert with, or at the direction of, and/or with the knowledge and/or consent of the owner and/or occupant of the lot, building or structure on, or in which, a public nuisance or violation exists or existed. The actions or inactions of a responsible person's agent, employee, representative or contractor may be attributed to that responsible person.
STRUCTURE: Shall mean that which is built or constructed, an edifice, wall, fence, or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner.
SUCCESSFUL INSPECTION: Shall mean a required inspection (as set forth in section 110 of the Building Code or section 109 of the Residential Code) in which the work inspected was determined by the Planning and Building DirectorCommunity Development Director to meet all applicable minimum Building/Residential Code requirements and the inspection was approved and documented as successful. A successful inspection shall also mean approval of work inspected under an electrical, fire, plumbing or mechanical permit that meets all applicable minimum requirements of the Electrical, Fire, Plumbing or Mechanical Codes.
UNPERMITTED STRUCTURE: Shall mean any structure, or portion thereof, that was erected, constructed, enlarged, altered, repaired, moved, improved, removed, connected, converted, demolished or equipped with electrical, plumbing or mechanical installations, at any point in time, without the required approval(s) and permit(s) having first been obtained from the Planning and Building DirectorCommunity Development Director. Unpermitted structures shall include those structures for which an action that is regulated by the Fire Code has occurred without first obtaining the required permit. Unpermitted structures shall include an incomplete structure as defined in this section. (Ord. 0-18-1335, 4-11-2018)
25.01.09: LIMITATION ON AUTHORITY - BOARD OF APPEALS:
Notwithstanding any provision to the contrary in the most recent editions of the California Building, Electrical, Fire, Mechanical, Plumbing and Residential Codes (as adopted by the City), Boards of Appeal or similar reviewing authorities that are established by those codes shall not have the authority to consider determinations of the Planning and Building DirectorCommunity Development Director or other government officials, that a responsible person has violated this chapter. (Ord. 0-18-1335, 4-11-2018)
25.01.10: ADOPTION OF ADMINISTRATIVE REGULATIONS:
PAGE 169 of 623
The chapters and article set forth below are hereby adopted by reference, subject to amendments thereto as set forth in this chapter. Those amendments shall control in the event of any conflict with adopted codes.
A. Chapter 1 of the 2016 California Building Code.
B. Chapter 1 of the 2016 California Residential Code.
C. Article 89 of the 2016 California Electrical Code.
D. Chapter 1 of the 2016 California Mechanical Code.
E. Chapter 1 of the 2016 California Plumbing Code.
F. Chapter 1 of the 2016 California Fire Code. (Ord. 0-18-1335, 4-11-2018) ARTICLE 02
BUILDING CODE
SECTION:
25.02.01: Building Code Adopted
25.02.02: Amendment Of Section 114.1
25.02.03: Amendment Of Section 113.1
25.02.04: Amendment Of Sections 109.2 And 109.6
25.02.05: Amendment Of Section 110.3.3.1, 110.3.9.1, 110.7
25.02.06: Amendment Of Section 111.1
25.02.07: Amendment Of Section 302.1
25.02.08: Amendment Of Section 312.2
25.02.09: Amendment Of Section 312.3 R317.1
25.02.10: Amendment Of Section 1505.1.1
25.02.11: Amendment Addition Of Section 1505.1.3
25.02.12: Amendment Of Section 1507.2.5.1
25.02.13: Amendment Of Section 1507.3.1
25.02.14: Amendment Of Section 1507.8.5
25.02.15: Amendment Of Section 1507.9.6
25.02.16: Amendment Addition Of Section 1613.51613.8
25.02.17: Amendment Addition Of Section 1613.61613.8
25.02.18: Amendment Addition Of Section 1613.71705.13.2
25.02.19: Amendment Addition Of Section 1613.8
25.02.20: Amendment Of Section 1705.3 And Table 1705.3
25.02.21: Amendment Of Section 1705.132
25.02.22: Amendment Addition Of Section 1710 And 1710.12304.10.4
25.02.23: Amendment Of Section 1807.1.4
25.02.24: Amendment Of Section 1807.1.6
25.02.25: Amendment Of Section 1809.3
25.02.26: Amendment Of Section 1809.7 And Table 1809.7
25.02.27: Amendment Of Section 1809.12
25.02.28: Amendment Of Section 1810.3.2.4
PAGE 170 of 623
25.02.29: Amendment Of Section 1905.1.3
25.02.30: Amendment Of Section 1905.1.8
25.02.31: Amendment Of Section 1905.1 And Addition Of Sections 1905.1.9 And 1905.1.10
25.02.32: Amendment Of Section 2304.10.2
25.02.33: Amendment Of Section 2304.12.2.8
25.02.34: Amendment Of Section 2305.4
25.02.35: Amendment Of Section 2305.5
25.02.36: Amendment Of Section 2306.2
25.02.37: Amendment Of Section 2306.3 And Addition Of Section
25.02.38: Amendment Of Section 2308.3.2
25.02.39: Amendment Of Sections 2308.106.5 And 2308.6.5.1
25.02.40: Amendment Of Table 2308.6.12308.10.1
25.02.41: Amendment Of Section 2308.6.9
25.02.42: Amendment Of Section 3109.2.1
25.02.01: BUILDING CODE ADOPTED:
A. Code Adopted: The California Building Code, 20252 edition, based on the 20241 International Building Code as published by the International Code Council, including all appendices, is hereby adopted by reference, and together with certain amendments and deletions, shall constitute the Building Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained for use and examination by the public.
B. Building Official Defined: For the purpose of this Code, the Planning and Building DirectorCommunity Development Director shall be the Building Official or his or her designee. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.02: AMENDMENT OF SECTION 114.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 114.1 of the Building Code is amended to read as follows:
114.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy, or maintain any building, structure or equipment or cause or permit the same to be done in violation of the Building Code.
It is hereby declared that any violation of the Building Code constitutes a public nuisance, and in addition to any other remedies provided by the Building Code for its enforcement, the City Council may bring civil suit to enjoin the violation of any provisions of this Building Code.
Any person, firm or corporation violating any of the provisions of the Building Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03A of this Code. Each separate day or any portion thereof during which violation of the Building Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
PAGE 171 of 623
25.02.03: AMENDMENT OF SECTION 113.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 113.1 of the Building Code is amended to read as follows:
113.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of this Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council. The Building Official shall be an ex officio member and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedure for conducting its business, and shall render all decisions and findings, in writing, to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Building Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.02.04: AMENDMENT OF SECTIONS 109.2 AND 109.6:
Notwithstanding the provisions of section 25.02.01 of this article, sections 109.2 and 109.6 of the Building Code are amended to read as follows:
109.2 Schedule of permit fees. The fee for each permit shall be as periodically established by City Council resolution.
109.2.1 Plan review fees. When plans or other data are required pursuant Section 107.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be 100 percent of the building permit fee established by resolution of the City Council.
109.2.2 Expiration of plan review. Applications for which no permit is issued within 180 days following the date the application or the date of final approval, if one exists, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days on written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee. 109.2.3 Expiration of building permits. Building permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit.
The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
PAGE 172 of 623
If an applicant wishes to renew a permit that has been expired for less than 6 months, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 6 months, 100% of the original fees paid shall be required to renew the permit.
109.6 Fee refunds. The Building Official may authorize refunding of any fee paid hereunder that was erroneously paid or collected.
The Building Official may authorize the refunding of not more than 80% of the permit fee paid when no work has been done under a permit in accordance with the Building code.
The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee within 60 days of the date of fee payment. (Ord. 0-19-1357, 11-13-2019)
25.02.05: ADDITION OF SECTIONS 110.3.3.1, 110.3.9.1 AND 110.7:
Notwithstanding the provisions of section 25.02.01 of this article, new sections 110.3.3.1, 110.3.9.1, and 110.7 are added to the Building Code to read as follows:
110.3.3.1 Prior to frame approval, a rough zoning inspection is required in order to ensure compliance with the approved Development Plans.
110.3.9.1 Prior to final approval, a final zoning inspection is required in order to ensure final compliance with approved Development Plans.
110.7 Connections prohibited. Unless approval has been first obtained from the Building Official, the connection of gas or electrical utilities shall be prohibited until the final zoning, building, heating, air conditioning, electrical, plumbing and grading inspections, as required, are completed and approval has been granted on any building. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.06: AMENDMENT OF SECTION 111.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 111.1 of the Building Code is amended to read as follows:
111.1 Use or Occupancy. No building or structure shall be used or occupied, and no change in the existing occupancy classification, tenancy, or change in proprietorship of a building or structure or portion thereof shall be made until the Building Official has issued a Certificate of Occupancy therefor as provided herein.
Exception: Group R, Division 3 and Group U occupancies.
Issuance of a Certificate of Occupancy shall not be construed as an approval of a violation of the provisions of the Building Code or of other ordinances of the City. Certificates presuming to give authority to violate or cancel the provisions of the Building Code or other ordinances of the City shall not be valid.
(Ord. 0-19-1357, 11-13-2019)
PAGE 173 of 623
25.02.07: AMENDMENT OF SECTION 302.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 302.1 of the Building Code is amended by adding a new paragraph to read as follows:
Any buildings or structures hereafter erected or constructed on C-l zoned property shall be constructed of one-hour fire resistive construction throughout.
This Section shall apply to:
1. Construction of any new building.
2. Addition, renovation or remodeling of any existing building when the value thereof is more than twenty percent (20%) of the estimated value of the existing building. The value of the proposed addition, renovation or remodeling shall be cumulative of all such renovation or remodeling over five (5) years.
The value of the proposed construction and of the existing building shall be determined by the Planning and Building Department based upon the latest edition of the Building Valuation Data as published by the International Code Council.
(Ord. 0-19-1357, 11-13-2019)
25.02.08: ADDITION OF SECTION 312.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 312.2 is added to the Building Code to read as follows:
312.2 Garage access. To provide a secondary means of egress from a private garage, a door, minimum 2'6" x 6'8" dimensions, shall be provided in addition to the automobile access door or doors.
(Ord. 0-19-1357, 11-13-2019)
25.02.09: ADDITION AMENDMENT OF SECTION 312.3 R317.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 312.3 317.1is added to the Building Code to read as follows:
312.3 Garage floor surfaces. In areas where motor vehicles are stored or operated, floor surface shall be concrete, and shall be a minimum 3-1/2 inches thick. No other floor coverings are permitted.
R317.1 Floor surface. Garage floor surfaces shall be of approved noncombustible material.
The area of floor used for parking of automobiles or other vehicles shall be sloped to facilitate the movement of liquids to a drain or toward the main vehicle entry doorway. Combustible Finished Flooring shall be prohibited. (Underlined will be our amendment to the code). (Ord. 0-19-1357, 11-13-2019)
25.02.10: AMENDMENT OF SECTION 1505.1.1:
PAGE 174 of 623
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1505.1.1 of the Building Code is amended by adding new paragraphs following the first sentence to read as follows:
1505.1.1 Roof CoveringsAssembly. Wood shakes and wood shingles for reroofing or repairs to an existing roof, or new construction of a roof are permitted provided they are Class A fire retardant roofing coverings.
Exception: Repairs to existing wood shake or wood shingle roof covering, which are considered minor (up to five percent (5%) of the roof area), may be allowed with Class B wood shingles or shakes.
Notwithstanding Section 1507.8.5, when more than thirty percent (30%) of the total roof area is replaced within any one (1) year period, the entire roof covering of every new structure and any roof covering applied in the alteration, repair or replacement of the roof of the existing structure shall be a fire-retardant roof covering that is at least Class A.
Reroofing over an existing Organic roof is not permitted unless the roofing is specifically approved in the classification required over existing substrate. Evidence of such approval must be submitted at the time of permit issuance. Fire severity zones are established by the Fire Department and the California Department of Forestry and Fire Protection. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.11: AMENDMENT ADDITION OF SECTION 1505.1.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1505.1.3 of the Building Code is amended by requiring minimum Class "BA" roofing for all types of construction for Group A-3, B, M and R-3 Occupancies.
(Ord. 0-19-1357, 11-13-2019)
25.02.12: ADDITION OF SECTION 1507.2.5.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 1507.2.5.1 is added to the Building Code to read as follows:
1507.2.5.1 Not more than one overlay of asphalt shingles shall be applied over an existing asphalt or wood shingle roof. Asphalt shingles applied over wood shingles shall not have less than Type 30 nonperforated felt underlayment installed prior to reroofing. (Ord. 0-19-1357, 11-13-2019)
25.02.13: AMENDMENT OF SECTION 1507.3.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 1507.3.1 of the Building Code is amended to read as follows:
1507.3.1 Deck requirements. Concrete and clay tile shall be installed only over solid structural sheathing boards.
(Ord. 0-19-1357, 11-13-2019)
PAGE 175 of 623
25.02.14: AMENDMENT OF SECTION 1507.8.5:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1507.8.5 of the Building Code is amended as follows:
Wood shingles shall be of naturally durable wood and comply with the requirements of Table 1507.8.5. If reroofing more than thirty percent (30%) of an existing roof within any one (1) year period, then the entire roof must comply with the current code. This means that all existing wood shingles must be removed and the new roof must be a code approved Class A roof covering as required by CBC Section 1505.1. If reroofing thirty percent (30%) or less of an existing roof within any one (1) year period, then only the area replaced needs to comply with the current code. This means that only the wood shingles in the area of replacement must be removed and the new roof material must be a code approved Class A roof covering as required by CBC Section 1505.1. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.15: AMENDMENT OF SECTION 1507.9.6:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 1507.9.6 of the Building Code is amended as follows:
Wood shake shall comply with the requirements of Table 1507.9.6. If reroofing more than thirty percent (30%) of an existing roof within any one (1) year period, then the entire roof must comply with the current code. This means that all existing wood shakes must be removed and the new roof must be a code approved Class A roof covering as required by CBC Section 1505.1.
If reroofing thirty percent (30%) or less of an existing roof within any one (1) year period, then only the area replaced needs to comply with current code. This means that only the wood shake in the area of replacement must be removed and the new roof material must be a code approved Class A roof covering as required by CBC Section 1505.1."
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-21-1380, 2-10-2021)
25.02.16: AMENDMENT ADDITION OF SECTION 1613.5 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.5 is added to chapter 16 of the 2019 Edition of the California Building Code to read as follows:
1613.5 ASCE 7, 12.12.3 Modify ASCE 7 Equation 12.12-1 of Section 12.12.3 to read as follows:
(12 .12-1)
(Ord. 0-19-1357, 11-13-2019)
25.02.17: AMENDMENT ADDITION OF SECTION 1613.6 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.6 1613.8 is added to chapter 16 of the 2019 Edition of the California Building Code to read as follows:
PAGE 176 of 623
1613.6 1613.8 ASCE 7, 12.2.3.1, Exception 3. Modify ASCE 7 Section 12.2.3.1 Exception 3 to read as follows:
3. Detached one- and two-family dwellings up to two stories in height of light frame construction.
(Ord. 0-19-1357, 11-13-2019)
25.02.18: AMENDMENT ADDITION OF SECTION 1613.7 1705.13.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.7 is added to the Building Code to read as follows:
1613.7 1705.13.2 ASCE 7, Section 12.11.2.2.3. Modify ASCE 7, Section 12.11.2.2.3 to read as follows:
12.11.2.2.3 Wood Diaphragms. In wood diaphragms, the continuous ties shall be in addition to the diaphragm sheathing. Anchorage shall not be accomplished by use of toe nails or nails subject to withdrawal nor shall wood ledgers or framing be used in cross-grain bending or cross-grain tension. The diaphragm sheathing shall not be considered effective as providing ties or struts required by this section.
For structures assigned to Seismic Design Category D, E or F, wood diaphragms supporting concrete or masonry walls shall comply with the following:
1. The spacing of continuous ties shall not exceed 40 feet. Added chords of diaphragms may be used to form subdiaphragms to transmit the anchorage forces to the main continuous crossties.
2. The maximum diaphragm shear used to determine the depth of the subdiaphragm shall not exceed 75% of the maximum diaphragm shear.
(Ord. 0-19-1357, 11-13-2019)
25.02.19: ADDITIONAMENDMENT OF SECTION 1613.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 1613.8 is added to the Building Code to read as follows:
1613.8 Suspended Ceilings. Minimum design and installation standards for suspended ceilings shall be determined in accordance with the requirements of Section 2506.2.1 of this Code and this section.
1613.8.1 Scope. This part contains special requirements for suspended ceilings and lighting systems. Provisions of Section 13.5.6 of ASCE 7-10 shall apply except as modified herein. 1613.8.2 General. The suspended ceilings and lighting systems shall be limited to 6 feet (1828 mm) below the structural deck unless the lateral bracing is designed by a licensed engineer or architect.
1613.8.3 Sprinkler Heads. All sprinkler heads (drops) except fire-resistance-rated floor/ceiling or roof/ceiling assemblies, shall be designed to allow for free movement of the sprinkler pipes with oversize rings, sleeves or adaptors through the ceiling tile. Sprinkler heads and other penetrations PAGE 177 of 623
shall have a 2 in. (50mm) oversize ring, sleeve, or adapter through the ceiling tile to allow for free movement of at least 1 in. (25mm) in all horizontal directions. Alternatively, a swing joint that can accommodate 1 in. (25 mm) of ceiling movement in all horizontal directions is permitted to be provided at the top of the sprinkler head extension.
Sprinkler heads penetrating fire-resistance-rated floor/ceiling or roof/ceiling assemblies shall comply with Section 714 of this Code.
1613.8.4 Special Requirements for Means of Egress. Suspended ceiling assemblies located along means of egress serving an occupant load of 30 or more shall comply with the following provisions.
1613.8.4.1 General. Ceiling suspension systems shall be connected and braced with vertical hangers attached directly to the structural deck along the means of egress serving an occupant load of 30 or more and at lobbies accessory to Group A Occupancies. Spacing of vertical hangers shall not exceed 2 feet (610 mm) on center along the entire length of the suspended ceiling assembly located along the means of egress or at the lobby.
1613.8.4.2 Assembly Device. All lay-in panels shall be secured to the suspension ceiling assembly with two hold-down clips minimum for each tile within a 4-foot (1219 mm) radius of the exit lights and exit signs.
1613.8.4.3 Emergency Systems. Independent supports and braces shall be provided for light fixtures required for exit illumination. Power supply for exit illumination shall comply with the requirements of Section 1006.3 of this Code.
1613.8.4.4 Supports for Appendage. Separate support from the structural deck shall be provided for all appendages such as light fixtures, air diffusers, exit signs, and similar elements. (Ord. 0-19-1357, 11-13-2019)
25.02.20: AMENDMENT OF SECTIONS 1705.3 AND TABLE 1705.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1705.3 and table 1705.3 of the Building Code are amended to read as follows:
1705.3 Concrete Construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1705.3.
Exceptions: Special inspection shall not be required for:
Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock, where the structural design of the footing is based on a specified compressive strength, f c, no greater than 2,500 pounds per square inch (psi) (17.2 Mpa) regardless of the compressive strength specified in the construction documents or used in the footing construction.
2. Continuous concrete footings supporting walls of buildings three stories or less in height that are fully supported on earth or rock where:
2.1. The footings support walls of light-frame construction; PAGE 178 of 623
2.2. The footings are designed in accordance with Table 1805.4.2; or
2.3. The structural design of the footing is based on a specified compressive strength, f c, no greater than 2,500 pounds per square inch (psi) (17.2 Mpa), regardless of the compressive strength specified in the construction documents or used in the footing construction.
3. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa).
4. Concrete patios, driveways and sidewalks, on grade.
PAGE 179 of 623
TABLE 1705.3
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION PAGE 180 of 623
For SI: 1 inch = 25.4 mm.
a. Where applicable, see Section 1705.13.
b. Specific requirements for special inspection shall be included in the research report for the anchor issued by an approved source in accordance with 26.13 in ACI 318, or other qualification procedures. Where specific requirements are not provided, special instruction requirements shall be specified by the registered design professional and shall be approved by the building official prior to the commencement of the work. c. [OSHPD 1R, 2 & 5] Installation of all adhesive anchors in horizontal and upwardly inclined positions shall be performed by an ACI/CRSI Certified Adhesive Anchor Installer, except where the factored design tension on the anchor is less than 100 pounds and those anchors are clearly noted on the approved construction documents or where the anchors are shear dowels across cold joints in slabs on grade where the slab is not part of the lateral force-resisting system.
(Ord. 0-19-1357, 11-13-2019)
25.02.21: AMENDMENT OF SECTION 1705.123:
Notwithstanding the provisions of section 25.02.01 of this article, section 1705.13 of the Building Code is amended to read as follows:
1705.13 Special inspections for seismic resistance. Special inspections itemized in Sections 1705.13.1 through 1705.13.9, unless exempted by the exceptions of Section 1704.2, are required for the following:
1. The seismic force-resisting systems in structures assigned to Seismic Design Category C, D, E or F in accordance with Sections 1705.13.1.1 through 1705.13.1.2, as applicable.
2. Designated seismic systems in structures assigned to Seismic Design Category C, D, E or F in accordance with Section 1705.13.4.
3. Architectural, mechanical and electrical components in accordance with Sections 1705.13.5.
4. Storage racks in structures assigned to Seismic Design Category D, E or F in accordance with Section 1705.13.7.
5. Seismic isolation systems in accordance with Section 1705.13.8.
Exception: Special inspections itemized in Sections 1705.13.1 through 1705.13.9 are not required for structures designed and constructed in accordance with one of the following:
1. The structure consists of light-frame construction; the design spectral response acceleration at short periods, SDS, as determined in Section 1613.2.4, does not exceed 0.5; and the building height of the structure does not exceed 35 feet (10 668 mm).
2. The seismic force-resisting system of the structure consists of reinforced masonry or reinforced concrete; the design spectral response acceleration at short periods, SDS, as determined in Section 1613.2.4, does not exceed 0.5; and the building height of the structure does not exceed 25 feet (7620 mm).
PAGE 181 of 623
3. The structure is a detached one- or two-family dwelling not exceeding two stories above grade plane, is not assigned to Seismic Design Category D, E or F and does not have any of the following horizontal or vertical irregularities in accordance with Section 12.3 of ASCE 7:
3.1 Torsional or extreme torsional irregularity.
3.2 Nonparallel systems irregularity.
3.3 Stiffness-soft story or stiffness-extreme soft story irregularity.
3.4 Discontinuity in lateral strength-weak story irregularity. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.22: ADDITION OF SECTIONS 1710 AND 1710.1 2304.10.4:
Notwithstanding the provisions of section 25.02.01 of this article, sections 1710 and 1710.1 2304.10.4 are added to, and chapter 35 of the Building Code is amended, to read as follows:
1710 General. The vertical load-bearing capacity, torsional moment capacity and deflection characteristics of joist hangers shall be determined in accordance with ASTM D 1761 and ASTM D 7147 as specified below using lumber having a specific gravity of 0.49 or greater, but not greater than 0.55, as determined in accordance with AF&PA AWC NDS for the joist and headers.
Exception: The joist length shall not be required to exceed 24 inches (610 mm). 1710.1 2304.10.4.1 Vertical load capacity for joist hangers. The vertical load-bearing capacity for the joist hanger shall be determined by testing a minimum of three joist hanger assemblies as specified in ASTM D 1761 or ASTM D 7147. If the ultimate vertical load for any one of the tests varies more than 20 percent from the average ultimate vertical load, at least three additional tests shall be conducted. The allowable vertical load-bearing of the joist hanger shall be the lowest value determined from the following:
1. The lowest ultimate vertical load for a single hanger from any test divided by three (where three tests are conducted and each ultimate vertical load does not vary more than 20 percent from the average ultimate vertical load).
2. The average ultimate vertical load for a single hanger from all tests divided by three (where six or more tests are conducted).
3. The average from all tests of the vertical loads that produce a vertical movement of the joist with respect to the header of 1/8 inch (3.2 mm).
4. The sum of the allowable design loads for nails or other fasteners utilized to secure the joist hanger to the wood members and allowable bearing loads that contribute to the capacity of the hanger.
5. The allowable design load for the wood members forming the connection.
Amend the Reference Standards in Chapter 35 for ASTM as follows:
PAGE 182 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.23: AMENDMENT OF SECTION 1807.1.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 1807.1.4 of the Building Code is amended to read as follows:
1807.1.4 Permanent wood foundation systems. Permanent wood foundation systems shall be designed and installed in accordance with AF&PA PWF. Lumber and plywood shall be treated in accordance with AWPA Ul (Commodity Specification A, Use Category 4B and Section 5.2) and shall be identified in accordance with Section 2303.1.89.1. Permanent wood foundation systems shall not be used for structures assigned to Seismic Design Category D, E or F. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.24: AMENDMENT OF SECTION 1807.1.6:
Notwithstanding the provisions of section 25.02.01 of this article, section 1807.1.6 of the Building Code is amended to read as follows:
1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and masonry foundation walls that are laterally supported at the top and bottom shall be permitted to be designed and constructed in accordance with this section. Prescriptive design of foundation walls shall not be used for structures assigned to Seismic Design Category D, E or F. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.25: AMENDMENT OF SECTION 1809.3:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.3 of the Building Code is amended to read as follows:
1809.3 Stepped footings. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).
PAGE 183 of 623
For structures assigned to Seismic Design Category D, E or F, the stepping requirement shall also apply to the top surface of grade beams supporting walls. Footings shall be reinforced with four No. 4 rebar. Two bars shall be place at the top and bottom of the footings as shown in Figure 1809.3.
FIGURE 1809.3
STEPPED FOOTING
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.26: AMENDMENT OF SECTION 1809.7 AND TABLE 1809.7:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.7 and table 1809.7 of the Building Code are amended to read as follows:
1809.7 Prescriptive footings for light-frame construction. Where a specific design is not provided, concrete or masonry-unit footings supporting walls of light-frame construction shall be permitted to be designed in accordance with Table 1809.7. Prescriptive footings in Table 1809.7 shall not exceed one story above grade plane for structures assigned to Seismic Design Category D, E or F.
PAGE 184 of 623
TABLE 1809.7
PRESCRIPTIVE FOOTINGS SUPPORTING WALLS OF LIGHT-FRAME
CONSTRUCTION a, b, c, d, e
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm
a. Depth of footings shall be in accordance with Section 1809.4. b. The ground under the floor shall be permitted to be excavated to the elevation of the top of the footing.
c. Not Adopted.
d. See Section 1908 for additional requirements for concrete footings of structures assigned to Seismic Design Category C, D, E or F.
e. For thickness of foundation walls, see Section 1807.1.6. f. Footings shall be permitted to support a roof addition to the stipulated number of floors.
Footings supporting roof only shall be as required for supporting one floor. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.27: AMENDMENT OF SECTION 1809.12:
Notwithstanding the provisions of section 25.02.01 of this article, section 1809.12 of the Building Code is amended to read as follows:
1809.12 Timber footings. Timber footings shall be permitted for buildings of Type V construction and as otherwise approved by the building official. Such footings shall be treated in accordance with AWPA Ul (Commodity Specification A, Use Category 4B). Treated timbers are not required where placed entirely below permanent water level, or where used as capping for wood piles that project above the water level over submerged or marsh lands. The compressive stresses perpendicular to grain in untreated timber footing supported upon treated piles shall not exceed 70 percent of the allowable stresses for the species and grade of timber as specified in the AF&PA NDS. Timber footings shall not be used in structures assigned to Seismic Design Category D, E or F.
PAGE 185 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.28: AMENDMENT OF SECTION 1810.3.2.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 1810.3.2.4 of the Building Code is amended to read as follows:
1810.3.2.4 Timber. Timber deep foundation elements shall be designed as piles or poles in accordance with AF&PA NDS. Round timber elements shall conform to ASTM D 25. Sawn timber elements shall conform to DOC PS-20. Timber shall not be used in structures assigned to Seismic Design Category D, E or F.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.29: AMENDMENT OF SECTION 1905.1.3
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1.3 of the Building Code is amended to read as follows:
1905.1.3 ACI 318, Section 18.5. Modify ACI 318, Section 18.5, by renumbering Section 18.5.2.2 to become new Sections 18.5.2.2, 18.5.2.3, 18.5.2.4 and 18.5.2.5 to read as follows:
18.5.2.2 - Connections that are designed to yield shall be capable of maintaining 80 percent of their design strength at the deformation induced by the design displacement or shall use Type 2 mechanical splices.
18.5.2.3 - Elements of the connection that are not designed to yield shall develop at least 1.5 Sy.
18.5.2.4 - In structures assigned to Seismic Design Category D, E or F, intermediate precast wall panels and wall piers shall be designed in accordance with Section 21.9 or 21.13.
18.5.2.5 - Wall piers not designed as part of a moment frame in buildings assigned to Seismic Design Category C shall have transverse reinforcement designed to resist the shear forces determined from 21.3.3. Spacing of transverse reinforcement shall not exceed 8 inches (203 mm).
Transverse reinforcement shall be extended beyond the pier clear height for at least 12 inches (305 mm).
Exceptions:
1. Wall piers that satisfy 18.10.8 or 18.14.
2. Wall piers along a wall line within a story where other shear wall segments provide lateral support to the wall piers and such segments have a total stiffness of at least six times the sum of the stiffnesses of all the wall piers.
18.5.2.6 - Wall segments with a horizontal length-to-thickness ratio less than 2.5 shall be designed as columns.
(Ord. 0-19-1357, 11-13-2019)
25.02.30: AMENDMENT OF SECTION 1905.1.8:
PAGE 186 of 623
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1.7 of the Building Code is amended to read as follows:
1905.1.7 ACI 318, Section 14.1.4. Delete ACI 318, Section 14.1.4, and replace with the following:
14.1.1 - Plain concrete in structures assigned to Seismic Design Category C, D, E or F.
14.1.4.1 - Structures assigned to Seismic Design Category C, D, E or F shall not have elements of structural plain concrete, except as follows:
(a) Concrete used for fill with a minimum cement content of two (2) sacks of Portland cement or cementious material per cubic yard.
(b) Isolated footings of plain concrete supporting pedestals or columns are permitted, provided the projection of the footing beyond the face of the supported member does not exceed the footing thickness.
(c) Plain concrete footings supporting walls are permitted provided the footings have at least two continuous longitudinal reinforcing bars. Bars shall not be smaller than No. 4 and shall have a total area of not less than 0.002 times the gross cross-sectional area of the footing. A minimum of one bar shall be provided at the top and bottom of the footing. Continuity of reinforcement shall be provided at corners and intersections.
In detached one- and two-family dwellings three stories or less in height and constructed with stud-bearing walls, are permitted to have plain concrete footings with at least two continuous longitudinal reinforcing bars not smaller than No. 4 are permitted to have a total area of less than
0.002 times the gross cross-sectional area of the footing. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.31: AMENDMENT OF SECTION 1905.1 AND ADDITION OF SECTIONS 1905.1.9 AND 1905.1.10:
Notwithstanding the provisions of section 25.02.01 of this article, section 1905.1 is amended and sections 1905.1.9 and 1905.1.10 are added to the Building Code to read as follows:
1905.1 General. The text of ACI 318 shall be modified as indicated in Sections 1905.1 through 1905.1.8
1905.1.9 ACI 318, Section 21.6.4. Modify ACI 318, Section 21.6.4, by adding Section 21.6.4.8 and 12.6.4.9 as follows:
21.6.4.8 Where the calculated point of contraflexure is not within the middle half of the member clear height, provide transverse reinforcement as specified in ACI 318 Sections 21.6.4.1, Items (a) through (c), over the full height of the member.
21.6.4.9 - At any section where the design strength, Pn, of the column is less than the sum of the shears Ve computed in accordance with ACI 318 Sections 21.5.4.1 and 21.6.5.1 for all the beams framing into the column above the level under consideration, transverse reinforcement as specified in ACI 318 Sections 21.6.4.1 through 21.6.4.3 shall be provided. For beams framing into PAGE 187 of 623
opposite sides of the column, the moment components are permitted to be assumed to be of opposite sign. For the determination of the design strength, Pn, of the column, these moments are permitted to be assumed to result from the deformation of the frame in any one principal axis. 1905.1.10 ACI 318, Section 21.9.4. Modify ACI 318, Section 21.9.4, by adding Section 21.9.4.6 as follows:
21.9.4.6 - Walls and portions of walls with Pu > 0.35Po shall not be considered to contribute to the calculated shear strength of the structure for resisting earthquake-induced forces. Such walls shall conform to the requirements of ACI 318 Section 21.13. (Ord. 0-19-1357, 11-13-2019)
25.02.32: AMENDMENT OF SECTION 2304.10.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2304.10.1 of the Building Code is amended to read as follows:
2304.10.2 Fastener requirements. Connections for wood members shall be designed in accordance with the appropriate methodology in Section 2302.1. The number and size of fasteners connecting wood members shall not be less than that set forth in Table 2304.10.2. Staple fasteners in Table 2304.10.2 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.
Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the building official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.33: AMENDMENT OF SECTION 2304.12.2.8:
Notwithstanding the provisions of section 25.02.01 of this article, section 2304.12.5 of the Building Code is amended to read as follows:
2304.12.2.8 Wood used in retaining walls and cribs. Wood installed in retaining or crib walls shall be preservative treated in accordance with AWPA Ul (Commodity Specifications A or F) for soil and fresh water use. Wood shall not be used in retaining or crib walls for structures assigned to Seismic Design Category D, E or F.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.34: ADDITION OF SECTION 2305.4:
Notwithstanding the provisions of section 25.02.01 of this article, section 2305.4 is added to the Building Code to read as follows:
2305.4 Quality of Nails. I23n Seismic Design Category D, E or F, mechanically driven nails used in wood structural panel shear walls shall meet the same dimensions as that required for handdriven nails, including diameter, minimum length and minimum head diameter. Clipped head or box nails are not permitted in new construction. The allowable design value for clipped head nails in existing construction may be taken at no more than the nail-head-area ratio of that of the same size hand-driven nails.
PAGE 188 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.35: ADDITION OF SECTION 2305.5:
Notwithstanding the provisions of section 25.02.01 of this article, section 2305.5 is added to the Building Code to read as follows:
2305.5 Hold-down connectors. In Seismic Design Category D, E or F, hold-down connectors shall be designed to resist shear wall overturning moments using approved cyclic load values or 75 percent of the allowable seismic load values that do not consider cyclic loading of the product.
Connector bolts into wood framing shall require steel plate washers on the post on the opposite side of the anchorage device. Plate size shall be a minimum of 0.229 inch by 3 inches by 3 inches (5.82 mm by 76 mm by 76 mm) in size. Hold-down connectors shall be tightened to finger tight plus one half (1/2) wrench turn just prior to covering the wall framing. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.36: AMENDMENT OF SECTION 2306.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2306.2 of the Building Code is amended to read as follows:
2306.2 Wood-frame diaphragms. Wood-frame diaphragms shall be designed and constructed in accordance with AWCF&PA SDPWS. Where panels are fastened to framing members with staples, requirements and limitations of AF&PA SDPWS shall be met and the allowable shear values set forth in Table 2306.2(1) or 2306.2(2) shall only be permitted for structures assigned to Seismic Design Category A, B, or C.
Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the building official.
The allowable shear values in Tables 2306.2(1) and 2306.2(2) are permitted to be increased 40 percent for wind design.
Exception: [DSA-SS, DSA-SS/CC and OSHPD 1, 2 &4] Wood structural panel diaphragms using staples as fasteners are not permitted by DSA and OSHPD.
Wood structural panel diaphragms used to resist seismic forces in structures assigned to Seismic Design Category D, E or F shall be applied directly to the framing members.
Exception: Wood structural panel diaphragms are permitted to be fastened over solid lumber planking or laminated decking, provided the panel joints and lumber planking or laminated decking joints do not coincide.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.37: AMENDMENT OF SECTION 2306.3 AND ADDITION OF SECTION 2307.2:
Notwithstanding the provisions of section 25.02.01 of this article, section 2306.3 is amended and section 2307.2 is added to the Building Code to read as follows:
PAGE 189 of 623
2306.3 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with AF&PA AWC SDPWS. For structures assigned to Seismic Design Category D, E, or F, application of Tables 4.3A and 4.3B of AF&PA SDPWS shall include the following:
1. Wood structural panel thickness for shear walls shall not be less than 3/8 inch thick and studs shall not be spaced at more than 16 inches on center.
2. The maximum nominal unit shear capacities for 3/8 inch wood structural panels resisting seismic forces in structures assigned to Seismic Design Category D, E or F is 400 pounds per linear foot (plf).
Exception: Other nominal unit shear capacities may be permitted if such values are substantiated by cyclic testing and approved by the building official.
3. Where shear design values using allow stress design (ASD) exceed 350 plf or load and resistance factor design (LRFD) exceed 500 plf, all framing members receiving edge nailing from abutting panels shall not be less than a single 3-inch nominal member, or two 2-inch nominal members fastened together in accordance with Section 2306.1 to transfer the design shear value between framing members. Wood structural panel joint and sill plate nailing shall be staggered at all panel edges. See Section 4.3.6.1 and 4.3.6.4.3 of AF&PA SDPWS for sill plate size and anchorage requirements.
4. Nails shall be placed not less than 1/2 inch in from the panel edges and not less than 3/8 inch from the edge of the connecting members for shear greater than 350 plf using ASD or 500 plf using LRFD. Nails shall be placed not less than 3/8 inch from panel edges and not less than 1/4 inch from the edge of the connecting members for shears of 350 plf or less using ASD or 500 plf or less using LRFD.
5. Table 4.3B application is not allowed for structures assigned to Seismic Design Category D, E, or F.
For structures assigned to Seismic Design Category D, application of Table 4.3C of AF&PA SDPWS shall not be used below the top level in a multi-level building for structures.
Where panels are fastened to framing members with staples, requirements and limitations of AF&PA SDPWS shall be met and the allowable shear values set forth in Table 2306.3(1), 2306.3(2) or 2306.3(3) shall only be permitted for structures assigned to Seismic Design Category A, B, or C.
Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the building official.
The allowable shear values in Tables 2306.3(1) and 2306.3(2) are permitted to be increased 40 percent for wind design. Panels complying with ANSI/APA PRP-210 shall be permitted to use design values for Plywood Siding in the AF&PA SDPWS.
Exception: [DSA-SS 7DSA-SS/CC and OSHPD 1, 2 &4] Wood structural panel shear walls using staples as fasteners are not permitted by DSA and OSHPD. 23067.32 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with Section 2306.3 as applicable.
PAGE 190 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.38: ADDITION OF SECTION 2308.3.2:
Notwithstanding the provisions of Section 25.02.01 of this Article, Section 2308.3.2 is added to the Building Code to read as follows:
2308.3.2 Braced wall line support. Braced wall lines shall be supported by continuous foundations.
Exception: For structures with a maximum plan dimension not over 50 feet (15240 mm), continuous foundations are required at exterior walls only for structures assigned to Seismic Design Category A, B, or C.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.39: AMENDMENT OF SECTIONS 2308.106.5 AND 2308.6.5.1:
Notwithstanding the provisions of section 25.02.01 of this article, sections 2308.6.5 and 2308.6.5.1, of the Building Code are amended to read as follows:
2308.6.5 Alternative bracing. Any bracing required by Section 2308.6.5 is permitted to be replaced by the following:
1. In one-story buildings, each panel shall have a length of not less than 2 feet 8 inches (813 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with 3/8-inch-minimum-thickness (9.5 mm) wood structural panel sheathing nailed with 8d common or galvanized box nails in accordance with Table 2304.10.1 and blocked at wood structural panel edges. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inch-minimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports. Two anchor bolts installed in accordance with Section 2308.3.1 shall be provided in each panel. Anchor bolts shall be placed at each panel outside quarter points. Each panel end stud shall have a tie-down device fastened to the foundation, capable of providing an approved uplift capacity of not less than 1,800 pounds (8006 N). The tie-down device shall be installed in accordance with the manufacturer's recommendations. The panels shall be supported directly on a foundation or on floor framing supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom.
Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned down slab edge is permitted at door openings in the braced wall line. This continuous footing or turned down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped 15 inches (381 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.
2. In the first story of two-story buildings, each wall panel shall be braced in accordance with Section 2308.6.5.1, Item 1, except that the wood
PAGE 191 of 623
structural panel sheathing shall be provided on both faces, three anchor bolts shall be placed at one-quarter points, and tie-down device uplift capacity shall not be less than 3,000 pounds (13 344 N).
2308.610.5.1 Alternate bracing wall panel adjacent to a door or window opening. Any bracing required by Section 2308.6.5 is permitted to be replaced by the following when used adjacent to a door or window opening with a full-length header:
1. In one-story buildings, each panel shall have a length of not less than 16 inches (406 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with a single layer of 3/8 inch (9.5 mm) minimum thickness wood structural panel sheathing nailed with 8d common or galvanized box nails in accordance with Figure 2308.6.1. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inchminimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports and in accordance with Figure 2308.9.3.2. The wood structural panel sheathing shall extend up over the solid sawn or gluedlaminated header and shall be nailed in accordance with Figure 2308.8.3.1. A built-up header consisting of at least two 2 x 12s and fastened in accordance with Item 24 of Table 2304.9.1 shall be permitted to be used. A spacer, if used, shall be placed on the side of the built-up beam opposite the wood structural panel sheathing. The header shall extend between the inside faces of the first full-length outer studs of each panel. The clear span of the header between the inner studs of each panel shall be not less than 6 feet (1829 mm) and not more than 18 feet (5486 mm) in length. A strap with an uplift capacity of not less than 1,000 pounds (4,400 N) shall fasten the header to the inner studs opposite the sheathing. One anchor bolt not less than 5/8 inch (15.9 mm) diameter and installed in accordance with Section 2308.6 shall be provided in the center of each sill plate. The studs at each end of the panel shall have a tie-down device fastened to the foundation with an uplift capacity of not less than 4,200 pounds (18 480 N).
Where a panel is located on one side of the opening, the header shall extend between the inside face of the first full-length stud of the panel and the bearing studs at the other end of the opening.
A strap with an uplift capacity of not less than 1,000 pounds (4400 N) shall fasten the header to the bearing studs. The bearing studs shall also have a tie-down device fastened to the foundation with an uplift capacity of not less than 1,000 pounds (4400 N).
The tie-down devices shall be an embedded strap type, installed in accordance with the manufacturer's recommendations. The panels shall be supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom.
Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned down slab edge is permitted at door openings in the braced wall line. This continuous footing or turned down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped not less than 15 inches (381 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.
2. In the first story of two-story buildings, each wall panel shall be braced in accordance with Item 1 above, except that each panel shall have a length of not less than 24 inches (610 mm).
PAGE 192 of 623
(Ord. 0-19-1357, 11-13-2019)
25.02.40: AMENDMENT OF TABLE 2308.6.1 2308.10.1:
Notwithstanding the provisions of section 25.02.01 of this article, table 2308.6.1 of the Building Code is amended to read as follows:
TABLE 2308.6.1 2308.10.1
WALL BRACING IN SEISMIC DESIGN CATEGORIES D AND E
(Minimum Percentage of Wall Bracing per each Braced Wall Linea) For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
a. Minimum length of panel bracing of one face of the wall for S-W sheathing shall be at least 4'-0" long or both faces of the wall for G-P sheathing shall be at least 8'-0" long; h/w ratio shall not exceed 2:1. For S-W panel bracing of the same material on two faces of the wall, the minimum length is permitted to be one-half the tabulated value but the h/w ratio shall not exceed 2:1 and design for uplift is required. The 2:1 h/w ratio limitation does not apply to alternate braced wall panels constructed in accordance with Section 2308.9.3.1 or 2308.9.3.2 2308.10.2. Wall framing to which sheathing used for bracing is applied shall be nominal 2 inch wide [actual 11/2 inch (38 mm)] or larger members and spaced a maximum of 16 inches on center. Braced wall panel construction types shall not be mixed within a braced wall line. b. G-P = gypsum board, portland cement plaster or gypsum sheathing boards; S-W = wood structural panels;
c. Nailing as specified below shall occur at all pane! edges at studs, at top and bottom plates and, where occurring, at blocking:
For 1/2-inch gypsum board, 5d (0.113 inch diameter) cooler nails at 7 inches on center; For 5/8- inch gypsum board, No. 11 gage (0.120 inch diameter) cooler nails at 7 inches on center; For gypsum sheathing board, 1-3/4 inches long by 7/16-inch head, diamond point galvanized nails at 4 inches on center;
For gypsum lath, No. 13 gage (0.092 inch) by 1-1/8 inches long, 19/64-inch head, plasterboard at 5 inches on center;
For Portland cement plaster, No. 11 gage (0.120 inch) by 11/2 inches long, 7/16- inch head at 6 inches on center;
d. S-W sheathing shall be a minimum of 15/32" thick nailed with 8d common placed 3/8 inches from panel edges and spaced not more than 6 inches on center and 12 inches on center along intermediate framing members.
PAGE 193 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.41: AMENDMENT OF SECTION 2308.6.9:
Notwithstanding the provisions of section 25.02.01 of this article, section 2308.6.9 of the Building Code is amended to read as follows:
2308.106.9 Attachment of sheathing. Fastening of braced wall panel sheathing shall not be less than that prescribed in Table 2308.6.1 and 2304.10.1. Wall sheathing shall not be attached to framing members by adhesives. Staple fasteners in Table 2304.10.1 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.
Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the building official.
All braced wall panels shall extend to the roof sheathing and shall be attached to parallel roof rafters or blocking above with framing clips (18 gauge minimum) spaced at maximum 24 inches (6096 mm) on center with four 8d nails per leg (total eight 8d nails per clip). Braced wall panels shall be laterally braced at each top corner and at maximum 24 inches (6096 mm) intervals along the top plate of discontinuous vertical framing.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.02.42: ADDITION OF SECTION 3109.2.1:
Notwithstanding the provisions of section 25.02.01 of this article, section 3109.2.1 is added to the Building Code to read as follows:
31109.2.1 Driveway Gates. Driveway gates serving as part of the required pool barrier shall comply with the following:
1. Driveway gates, if operated manually, shall have a spring-loaded, self-closing, self-latching mechanism installed in accordance with the same procedure required in the City Building Code for pedestrian gates.
2. Driveway gates may be equipped with an electric gate-operating device provided that it is approved by a recognized Electrical Testing Agency and contain a battery backup system.
3. Electric gate-operating devices shall be provided with a safety mechanism to interrupt and recycle the device, should the gate become blocked.
4. Electric gate-operating devices shall be provided with a time delay closing device, which is set and maintained to activate a maximum of 30 seconds after the gate has been opened. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 3. New Article 03 Residential Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
PAGE 194 of 623
ARTICLE 03
RESIDENTIAL CODE
SECTION:
25.03.01: Residential Code Adopted
25.03.02: Amendment Of Section R112.1
25.03.03: Addition Of Section R113.1
25.03.04: Amendment Of Sections R108.2 And R108.5
25.03.05: Addition of Sections R109.1.5.4, R109.1.5.5, And R109.1.6.3
25.03.06: Amendment Of Table R301.2.2.1.1 And Section R301.2.2.1.2
25.03.07: Amendment Of Section R301.2.2.6
25.03.08: Addition of Section R301.2.2.11
25.03.09: Addition of Section R337.1
25.03.0910: Amendment Of Section R401.1
25.03.101: Amendment Of Sections R403.1.2, R403.1.3 And R403.1.5
25.03.112: Amendment Of Section R404.2
25.03.123: Amendment Of Section R501.1
25.03.134: Amendment Of Section R503.2.4
25.03.145: Amendment Of Table R602.3(1)
25.03.156: Amendment Of Table R602.3(2)
25.03.167: Amendment Of Table R602.10.3(3)
25.03.178: Amendment Of Table R602.10.4
25.03.189: Amendment Of Figure R602.10.6.1
25.03.2019: Amendment Of Figure R602.10.6.2
25.03.201: Amendment Of Table R602.10.5
25.03.212: Amendment Of Section R602.10.2.3
25.03.223: Amendment Of Section R606.4.4
25.03.234: Amendment Of Section R606.12.2.2.3
25.03.245: Amendment Of Section R602.3.2
25.03.256: Amendment Of Section R803.2.4
25.03.267: Amendment Of Section R1001.3.1
25.03.01: RESIDENTIAL CODE ADOPTED:
Except as hereinafter provided, the California Residential Code, 20252 edition, based on the 20241 International Residential Code as published by the International Code Council, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Residential Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained for use and examination by the public. For the purposes of this code, the Building Official shall be the Building Official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.03.02: AMENDMENT OF SECTION R112.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R112 of the Residential Code is hereby amended to read as follows:
PAGE 195 of 623
R112.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of the Residential Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council.
The Building Official shall be an ex officio member of and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedures for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Residential Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.03.03: AMENDMENT OF SECTION R113.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R113.1 of the Residential Code is amended to read as follows:
R113.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy, or maintain any building, structure or equipment or cause or permit the same to be done in violation of the Residential Code.
It is hereby declared that any violation of the Residential Code constitutes a public nuisance, and in addition to any other remedies provided by the Residential Code for its enforcement, the City Council may bring civil suit to enjoin the violation of any provisions of this Residential Code.
Any person, firm or corporation violating any of the provisions of the Residential Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03A of this Code. Each separate day or any portion thereof during which violation of the Residential Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
25.03.04: AMENDMENT OF SECTIONS RIl08.2 AND R108.5:
Notwithstanding the provisions of section 25.03.01 of this article, sections R108.2 and R108.5 of the Residential Code are amended to read as follows:
R108.2 Schedule of permit fees. The fee for each permit shall be as periodically established by City Council resolution.
R108.2.1 Plan review fees. When plans or other data are required pursuant to Section R106, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be one-hundred percent (100%) of the building permit fee established by resolution of the City Council.
R108.2.2 Expiration of plan review. Applications for which no permit is issued within 180 days following the date the application or the date of final approval, if one exists, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant PAGE 196 of 623
or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days on written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.
R108.2.3 Expiration of building permits. Building permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit.
The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
If an applicant wishes to renew a permit that has been expired for less than 6 months, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 6 months, 100% of the original fees paid shall be required to renew the permit.
R108.5 Fee refunds. The Building Official may authorize refunding of any fee paid hereunder that was erroneously paid or collected.
The Building Official may authorize the refunding of not more than 80% of the permit fee paid when no work has been done under a permit in accordance with the Residential Code.
The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee within 60 days of the date of fee payment. (Ord. 0-19-1357, 11-13-2019)
25.03.05: ADDITION OF SECTIONS Rl09.1.5.4, RIl09.1.5.5, and R109.1.6.3:
Notwithstanding the provisions of section 25.03.01 of this article, new sections R109.1.5.3, R109.1.5.3, and R109.1.6.3 are added to the Residential Code to read as follows:
R109.1.5.4 Prior to frame approval, a rough zoning inspection is required in order to ensure compliance with the approved Development Plans.
R109.1.5.5 Prior to final approval, a final zoning inspection by Planning Department staff is required in order to ensure final compliance with approved Development Plans.
R109.1.6.3 Connections prohibited. Unless approval has been first obtained from the Building Official, the connection of gas or electrical utilities shall be prohibited until the final building, heating, air conditioning, electrical, plumbing and grading inspections, as required, are completed and approval has been granted on any building.
(Ord. 0-19-1357, 11-13-2019)
25.03.06: AMENDMENT OF TABLE R301.2.2.1.1 AND SECTION R301.2.2.1.2:
PAGE 197 of 623
Notwithstanding the provisions of section 25.03.01 of this article, table R301.2.2.1.1 and section R301.2.2.1.2 of the Residential Code are amended to read as follows:
TABLE R301.2.2.1.1
SEISMIC DESIGN CATEGORY DETERMINATION
R301.2.2.1.2 Alternative determination of Seismic Design Category E. Buildings located in Seismic Design Category E in accordance with Figure R301.2(2) are permitted to be reclassified as being in Seismic Design Category D2 provided one of the following is done:
1. A more detailed evaluation of the seismic design category is made in accordance with the provisions and maps of the California Building Code. Buildings located in Seismic Design Category E per Table R301.2.2.1.1, but located in Seismic Design Category D per the California Building Code, may be designed using the Seismic Design Category D2 requirements of this code.
2. Buildings located in Seismic Design Category E that conform to the following additional restrictions are permitted to be constructed in accordance with the provisions for Seismic Design Category D2 of this code:
2.1. All exterior shear wall lines or braced wall panels are in one plane vertically from the foundation to the uppermost story.
2.2. Floors shall not cantilever past the exterior walls.
2.3. The building is within all of the requirements of Section R301.2.2.5 for being considered as regular.
2.4. For buildings over one story in height, the calculated SDS shall not exceed l.25g. (Ord. 0-19-1357, 11-13-2019)
25.03.07: AMENDMENT OF SECTION R301.2.2.6:
Notwithstanding the provisions of section 25.03.01 of this article, items 1, 3 and 5 of section R301.2.2.6 of the Residential Code are amended to read as follows:
1. When exterior shear wall lines or braced wall panels are not in one plane vertically from the foundation to the uppermost story in which they are required.
3. When the end of a braced wall panel occurs over an opening in the wall.
PAGE 198 of 623
5. When portions of a floor level are vertically offset. (Ord. 0-19-1357, 11-13-2019)
25.03.08: ADDITION OF SECTION R301.2.2.11:
Notwithstanding the provisions of section 25.03.01 of this article, section R301.2.2.11 is added to the Residential Code to read as follows:
R301.2.2.11 Anchorage of Mechanical, Electrical, or Plumbing Components and Equipment. Mechanical, electrical, or plumbing components and equipment shall be anchored to the structure. Anchorage of the components and equipment shall be designed to resist loads in accordance with the International Building Code and ASCE 7, except where the component is positively attached to the structure and flexible connections are provided between the component and associated ductwork, piping, and conduit; and either
1. The component weighs 400 lb (1,780 N) or less and has a center of mass located 4 ft (1.22 m) or less above the supporting structure; or
2. The component weighs 20 lb (89N) or less or, in the case of a distributed system, 5 lb/ft (73 N/m) or less.
(Ord. 0-19-1357, 11-13-2019)
25.03.09: ADDITION OF SECTION R337.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R337 is added to the Residential Code to read as follows:
R337.1 Application-New Buildings. All new residential buildings of any occupancy that are located in the Very High Fire Hazard Severity Zone (VHFHSZ) as designated by the City of San Marino.
R337.2 Application-Additions & Remodels. The addition and remodeling areas of existing building of any occupancy that are located within the Very High Fire Hazard Severity Zone (VHFHSZ) as designated by the city of San Marino.
337.3 Protection of enclosed eaves. The exposed underside of enclosed roof eaves and soffits shall be protected on the exposed underside by one or more of the following:
1. Noncombustible materials.
2. Ignition-resistant building materials.
3. Materials approved for not less than 1-hour fire-resistance-rated construction on the exterior side, as tested in accordance with ASTM E119 or UL 263.
4. 2-inch (51 mm) nominal dimension lumber.
5. 1-inch (25 mm) nominal fire-retardant-treated lumber or 3/4-inch (19.1 mm) nominal fire-retardant-treated plywood, identified for exterior use and complying with Section 2303.2 of the California Building Code.
6. Boxed-in roof eave soffit assemblies with an underside that meets the performance criteria as determined by the Building Official when tested in accordance with the test procedures set forth in ASTM E2957.
PAGE 199 of 623
7. Boxed-in roof eave soffit assemblies with an underside that meets the performance criteria in accordance with the test procedures set forth in SFM Standard 12-7A-3.
Facias are required and shall be ignition-resistant building materials, fire-retardanttreated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code, materials approved for not less than 1-hour fire-resistance rated construction or 2-inch (51 mm) nominal dimension lumber. 337.3.1 Protection of open eaves. The exposed roof deck on the underside of unenclosed roof eaves shall consist of one or more of the following:
1. Noncombustible material.
2. Ignition-resistant building material.
3. Fire-retardant-treated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code.
4. Materials approved for not less than 1-hour fire-resistance-rated construction on the exterior side, as tested in accordance with ASTM E119 or UL 263.
5. 2-inch (51 mm) nominal dimension lumber.
6. One layer of 5/8-inch (16 mm) Type X gypsum sheathing applied behind an exterior covering on the underside of the roof deck.
7. The exterior portion of a 1-hour fire-resistance-rated exterior assembly, as tested in accordance with ASTM E119 or UL 263, applied to the underside of the roof deck designed for exterior fire exposure, including assemblies using the gypsum panel and sheathing products listed in the Gypsum Association Fire Resistance Design Manual.
Facias, if provided, shall be of fire-retardant-treated wood labeled for exterior use and complying with Section 2303.2 of the California Building Code, ignition-resistant building materials, materials approved for not less than 1-hour fire-resistance-rated construction or 2-inch (51 mm) nominal dimension lumber. 337.10 Vents. Where provided, ventilation openings for enclosed attics, gable ends, ridge ends, under eaves and cornices, enclosed eave soffit spaces, enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters, underfloor ventilation, foundations and crawl spaces, or any other opening intended to permit ventilation, either in a horizontal or vertical surface, shall be in accordance with Section 337.10.1 or Section 337.10.2 to resist building ignition from the intrusion of burning embers and flame through the ventilation openings. 337.10.1 Performance requirements. Ventilation openings shall be fully covered with Wildfire Flame and Ember Resistant vents approved and listed by the California State Fire Marshal, or WUI vents, tested in accordance with ASTM E2886, to demonstrate compliance with all the following requirements:
1. There shall be no flaming ignition of the cotton material during the Ember Intrusion Test.
2. There shall be no flaming ignition during the Integrity Test portion of the Flame Intrusion Test.
3. The maximum temperature of the unexposed side of the vent shall not exceed 662°F (350°C).
PAGE 200 of 623
337.10.2 Off ridge and ridge vents. Vents that are installed on a sloped roof, such as dormer vents, shall comply with all of the following:
1. Vents shall be covered with a mesh where the dimensions of the mesh therein shall be a minimum of 1/16 inch (1.6 mm) and
shall not exceed 1/8 inch (3.2 mm) in diameter.
2. The vent and mesh material shall be noncombustible.
3. The vent and mesh material shall be corrosion resistant. 337.10.3 Vent locations. Gable-end and dormer vents shall be located not less than 10 feet (3048 mm) from lot lines. Underfloor ventilation openings shall be located as close to grade as practical
25.03.1009: AMENDMENT OF SECTION R401.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R401.1 of the Residential Code is amended to read as follows:
R401.1 Application. The provisions of this chapter shall control the design and construction of the foundation and foundation spaces for all buildings. In addition to the provisions of this chapter, the design and construction of foundations in areas prone to flooding as established by Table R301.2(1) shall meet the provisions of Section R322. Wood foundations shall be designed and installed in accordance with AWCF&PA PWF.
Exception: The provisions of this chapter shall be permitted to be used for wood foundations only in the following situations:
1. In buildings that have no more than two floors and a roof.
2. When interior basement and foundation walls are constructed at intervals not exceeding 50 feet (15 240 mm).
Wood foundations in Seismic Design Category D0, D1 or D2 shall not be permitted.
Exception: In non-occupied, single-story, detached storage sheds and similar uses other than carport or garage, provided the gross floor area does not exceed 200 square feet, the plate height does not exceed 12 feet in height above the grade plane at any point, and the maximum roof projection does not exceed 24 inches.
(Ord. 0-19-1357, 11-13-2019)
25.03.101: AMENDMENT OF SECTIONS R403.1.2, R403.1.3 AND R403.1.5:
Notwithstanding the provisions of section 25.03.01 of this article, sections R403.1.2, R403.1.3 and R403.1.5 of the Residential Code are amended to read as follows:
R403.1.2 Continuous footing in Seismic Design Categories Do, D1i and D2. The braced wall panels at exterior walls of buildings located in Seismic Design Categories D0, D1 and D2 shall be supported by continuous footings. All required interior braced wall panels in buildings shall be supported by continuous footings.
PAGE 201 of 623
R403.1.3 Seismic reinforcing. Concrete footings located in Seismic Design Categories D0, D1 and D2, as established in Table R301.2(1), shall have minimum reinforcement. Bottom reinforcement shall be located a minimum of 3 inches (76 mm) clear from the bottom of the footing.
In Seismic Design Categories D0, D1 and D2 where construction joint is created between a concrete footing and a stem wall, a minimum of one No. 4 bar shall be installed at not more than 4 feet (1219 mm) on center. The vertical bar shall extend to 3 inches (76 mm) clear of the bottom of the footing, have a standard hook and extend a minimum of 14 inches (357 mm) into the stem wall.
In Seismic Design Categories D0, D1 and D2 where a grouted masonry stem wall is supported on a concrete footing and stem wall, a minimum of one No. 4 bar shall be installed at not more than 4 feet (1219 mm) on center. The vertical bar shall extend to 3 inches (76 mm) clear of the bottom of the footing and have a standard hook.
In Seismic Design Categories D0, D1 and D2 masonry stem walls without solid grout and vertical reinforcing are not permitted.
Exception: In detached one- and two-family dwellings located in Seismic Design Category A, B or C which are three stories or less in height and constructed with stud bearing walls, isolated plain concrete footings, supporting columns or pedestals are permitted.
R403.1.5 Slope. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).
For structures located in Seismic Design Categories D0, D1 or D2, stepped footings shall be reinforced with four No. 4 rebar. Two bars shall be place at the top and bottom of the footings as shown in Figure R403.1.5.
PAGE 202 of 623
FIGURE R403.1.5
STEPPED FOOTING
(Ord. 0-19-1357, 11-13-2019)
25.03.121: AMENDMENT OF SECTION R404.2:
Notwithstanding the provisions of section 25.03.01 of this article, section R404.2 of the Residential Code is amended to read as follows:
R404.2 Wood foundation walls. Wood foundation walls shall be constructed in accordance with the provisions of Sections R404.2.1 through R404.2.6 and with the details shown in Figures R403.1(2) and R403.1(3). Wood foundation walls shall not be used for structures located in Seismic Design Category D0, D1 or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.132: AMENDMENT OF SECTION R501.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R501.1 of the Residential Code is amended to read as follows:
R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces used to house mechanical or plumbing fixtures and equipment. Mechanical or plumbing fixtures and equipment shall be attached (or anchored) to the structure in accordance with Section R301.2.2.11. (Ord. 0-19-1357, 11-13-2019)
25.03.143: ADDITION OF SECTION R503.2.4:
PAGE 203 of 623
Notwithstanding the provisions of section 25.03.01 of this article, section R503.2.4 is added to the Residential Code to read as follows:
R503.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms with a dimension perpendicular to the joist that is greater than 4 feet (1.2 m) shall be constructed in accordance with Figure R503.2.4.
a. Blockings shall be provided beyond headers.
b. Metal ties not less than 0.058 inch [1.47 mm (16 galvanized gage)] by 1.5 inches (38 mm) wide with eight 16d common nails on each side of the header-joist intersection. The metal ties shall have a minimum yield of 33,000 psi (227 MPa).
c. Openings in diaphragms shall be further limited in accordance with Section R301.2.2.2.5.
FIGURE R503.2.4
OPENINGS IN HORIZONTAL DIAPHRAGMS
(Ord. 0-19-1357, 11-13-2019)
25.03.1514: AMENDMENT OF TABLE R602.3(1):
Notwithstanding the provisions of section 25.03.01 of this article, lines 37 and 38 of table R602.3(1) of the Residential Code are amended to read as follows:
TABLE R602.3(1)
FASTENER SCHEDULE FOR STRUCTURAL MEMBERS
PAGE 204 of 623
PAGE 205 of 623
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 mile per hour = 0.447 m/s; 1 Ksi = 6.895 MPa. a. All nails arc smooth-common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall have minimum average bending yield strengths as shown: 80 ksi for shank diameter of 0.192 inch (20d common nail), 90 ksi for shank diameters larger than 0.142 inch but not larger than 0.177 inch, and 100 ksi for shank diameters of 0.142 inch or less.
b. Staples are 16 gage wire and have a minimum 7/6-inch on diameter crown width. b. c. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches or greater.
c.d. Four-foot by 8-fool or 4-foot by 9-foot panels shall be applied vertically. d.e. Spacing of fasteners not included in this table shall be based on Table R602.3(2). e.f. For regions having basic wind speed of 110 mph or greater, 8d deformed (2'/2"x 0.120) nails shall be used for attaching plywood and wood structural panel roof sheathing to framing within minimum 4S-inch distance from gable end walls, if mean roof height is more than 25 feet, up to 35 feet maximum.
PAGE 206 of 623
f.g. For regions having bask wind speed of 100 mph or less, nails for attaching wood structural panel roof sheathing to gable end wall framing shall be spaced 6 inches on center. When basic wind speed is greater than 100 mph, nails for attaching panel roof sheathing to intermediate supports shall be spaced 6 inches on center for minimum 48-inch distance from ridges, eaves and gable end walls; and 4 inches on center to gable end wall framing. g.h. Gypsum sheathing shall conform to ASTM C 1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall conform to ASTM C 208. h.i. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and at all floor perimeters only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members and required blocking. Blocking of roof or floor sheathing panel edges perpendicular to the framing members need not be provided except as required by other provisions of this code. Floor perimeter shall be supported by framing members or solid blocking.
i.j. Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one side of the rafter and toe nails from the ceiling joist to top plate in accordance with this schedule. The toe nail on the opposite side of the rafter shall not be required.
j.K. Use of staples in braced wall panels shall be prohibited in Seismic Design Category D0, D1, or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.1516: AMENDMENT OF TABLE R602.3(2):
Notwithstanding the provisions of section 25.03.01 of this article, footnote "b" of table R602.3(2) of the Residential Code is amended to read as follows:
b. Staples shall have a minimum crown width of 7/16-inch on diameter except as noted. Use of staples in roof, floor, subfloor, and braced wall panels shall be prohibited in Seismic Design Category D0, D1, or D2.
(Ord. 0-19-1357, 11-13-2019)
25.03.176: AMENDMENT OF SECTION R602.10.3(3):
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.3(3) of the Residential Code is amended to read as follows:
PAGE 207 of 623
PAGE 208 of 623
PAGE 209 of 623
PAGE 210 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.187: AMENDMENT OF TABLE R602.10.4:
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.4 of the Residential Code is amended to read as follows:
PAGE 211 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.198: AMENDMENT OF FIGURE R602.10.6.1:
Notwithstanding the provisions of section 25.03.01 of this article, figure R602.10.6.1 of the Residential Code is amended to read as follows:
PAGE 212 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.2019: AMENDMENT OF FIGURE R602.10.6.2:
Notwithstanding the provisions of section 25.03.01 of this article, figure R602.10.6.2 of the Residential Code is amended to read as follows:
PAGE 213 of 623
(Ord. 0-19-1357, 11-13-2019)
25.03.210: AMENDMENT OF TABLE R602.10.5:
Notwithstanding the provisions of section 25.03.01 of this article, table R602.10.5 of the Residential Code is amended to read as follows:
TABLE R602.10.5 602.10.6.5.4
MINIMUM LENGTH OF BRACED WALL PANELS
PAGE 214 of 623
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, I mile per hour=Q.447 m/s. NP = Not Permitted.
PAGE 215 of 623
a. Linear interpolation shall be permitted.
b. Use the actual length when it is greater than or equal lo the minimum length. c. Maximum header height for PFH is 10 feet in accordance with Figure R602.10.6.2, but wall height may be increased to 12 feet with pony wall.
d. Maximum opening height for PFG is 10 feet in accordance with Figure R602.10.6.3. but wall height maybe increased to 12 feet with pony wall,
e. Maximum opening height for CS-PF is 10 feet in accordance with Figure R602.10.6.4. but wall height may be increased to 12 feet with pony wall. (Ord. 0-19-1357, 11-13-2019)
25.03.221: AMENDMENT OF SECTION R602.10.2.3:
Notwithstanding the provisions of section 25.03.01 of this article, section R602.10.2.3 of the Residential Code is amended to read as follows:
R602.10.2.3 Minimum number of braced wall panels. Braced wall lines with a length of 16 feet (4877 mm) or less shall have a minimum of two braced wall panels of any length or one braced wall panel equal to 48 inches (1219 mm) or more. Braced wall lines greater than 16 feet (4877 mm) shall have a minimum of two braced wall panels. No braced wall panel shall be less than 48 inches in length in Seismic Design Category D0, D1, or D2. (Ord. 0-19-1357, 11-13-2019)
25.03.232: AMENDMENT OF SECTION R606.4.4:
Notwithstanding the provisions of section 25.03.01 of this article, section R606.4.4 of the Residential Code is amended to read as follows:
R606.4.4 Parapet walls. Unreinforced solid masonry parapet walls shall not be less than 8 inches (203 mm) thick and their height shall not exceed four times their thickness. Unreinforced hollow unit masonry parapet walls shall be not less than 8 inches (203 mm) thick, and their height shall not exceed three times their thickness. Masonry parapet walls in areas subject to wind loads of 30 pounds per square foot (1.44 kPa) or located in Seismic Design Category D0, DI or D2, or on townhouses in Seismic Design Category C shall be reinforced in accordance with Section R606.12.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.03.243: AMENDMENT OF SECTION R606.12.2.2.3:
Notwithstanding the provisions of Section 25.03.01 of this article, section R606.12.2.2.3 of the Residential Code is amended to read as follows:
R606.12.2.2.3 Reinforcement requirements for masonry elements. Masonry elements listed in Section R606.12.2.2.2 shall be reinforced in either the horizontal or vertical direction as shown in Figure R606.11(32) and in accordance with the following:
PAGE 216 of 623
1. Horizontal reinforcement. Horizontal joint reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Horizontal reinforcement shall be provided within 16 inches (406 mm) of the top and bottom of these masonry elements.
2. Vertical reinforcement. Vertical reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Vertical reinforcement shall be within 8 inches (406mm) of the ends of masonry walls.
(Ord. 0-19-1357, 11-13-2019)
25.03.2524: AMENDMENT OF SECTION R602.3.2:
Notwithstanding the provisions of section 25.03.01 of this article, section R602.3.2, Exception, of the Residential Code is amended to read as follows:
Exception: In other than Seismic Design Category D0, D1 or D2, a single top plate may be installed in stud walls, provided the plate is adequately tied at joints, corners and interesting walls by a minimum 3-inch-by-6-inch by a 0.036-inch-thick (76 mm by 152 mm by 0.914 mm) galvanized steel plate that is nailed to each wall or segment of wall by six 8d nails on each side, provided the rafters or joists are centered over the studs with a tolerance of no more than 1 inch (25 mm). The top plate may be omitted over lintels that are adequately tied to adjacent wall sections with steel plates or equivalent as previously described. (Ord. 0-19-1357, 11-13-2019)
25.03.265: ADDITION OF SECTION R803.2.4:
Notwithstanding the provisions of section 25.03.01 of this article, section R803.2.4 is added to the Residential Code to read as follows:
R803.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms shall conform with Section R503.2.4.
(Ord. 0-19-1357, 11-13-2019)
25.03.276: AMENDMENT OF SECTION R1001.3.1:
Notwithstanding the provisions of section 25.03.01 of this article, section R1001.3.1 of the Residential Code is amended to read as follows:
R1001.3.1Vertical reinforcing. For chimneys up to 40 inches (1016 mm) wide, four No. 4 continuous vertical bars adequately anchored into the concrete foundation shall be placed between wythes of solid masonry or within the cells of hollow unit masonry and grouted in accordance with Section R609. Grout shall be prevented from bonding with the flue liner so that the flue liner is free to move with thermal expansion. For chimneys more than 40 inches (1016 mm) wide, two additional No. 4 vertical bars adequately anchored into the concrete foundation shall be provided for each additional flue incorporated into the chimney or for each additional 40 inches (1016 mm) in width or fraction thereof.
(Ord. 0-19-1357, 11-13-2019)
Section 4. New Article 04 Plumbing Code is hereby added to Chapter 25 of the San PAGE 217 of 623
Marino City Code to read as follows:
ARTICLE 04
PLUMBING CODE
SECTION:
25.04.01: Plumbing Code Adopted
25.04.02: Amendment Of Section 103.3
25.04.03: Amendment Of Sections 104.3.2 And 104.3.3
25.04.04: Amendment Of Section 104.4.3
25.04.05: Amendment Of Section 104.4.5
25.04.06: Amendment Of Section 104.5
25.04.07: Amendment Of Section 105.2.6
25.04.08: Amendment Of Sections 106.1 And 106.3
25.04.09: Amendment Of Section 203.0
25.04.10: Addition Amendment Of Section 312.13
25.04.11: Addition Amendment Of Section 511.0
25.04.12: Addition Of Section 713.8
25.04.13: Addition Amendment Of Section 906.8
25.04.01: PLUMBING CODE ADOPTED:
Except as hereinafter provided, the California Plumbing Code, 20252 Edition, based on the 20241 Uniform Plumbing Code as published by the International Association of Plumbing and Mechanical Officials, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Plumbing Code of the City. A copy of said Code has been deposited in the office of the City Clerk and shall be, at all times, maintained by the City Clerk for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.04.02: AMENDMENT OF SECTION 103.3:
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 103.3 of the Plumbing Code is amended to read as follows:
Issuance. The Building Official or his/her designee shall review the application, plans and specifications and other data filed by an applicant for a permit. Other departments of this jurisdiction may also review plans. If the Building Official or his/her designee finds that the work described in an application for permit and the plans, specifications and other data filed therewith conform to the requirements of the Plumbing Code and other pertinent laws and ordinances, and that the fees established by resolution of the City Council have been paid, he/she shall issue a permit therefore to the applicant.
(Ord. 0-19-1357, 11-13-2019)
25.04.03: AMENDMENT OF SECTIONS 104.3.2 AND 104.3.3:
PAGE 218 of 623
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 104.3.2, and section 104.3.3, of the Plumbing Code are amended to read as follows:
104.3.2 Plan Review Fees. When a plan or other data are required to be submitted by Section 104.3.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for plumbing work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council.
104.3.3 Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.
(Ord. 0-19-1357, 11-13-2019)
25.04.04: AMENDMENT OF SECTION 104.4.3:
Notwithstanding the provisions of section 25.04.01 of this article, the first paragraph of section 104.4.3 of the Plumbing Code is amended to read as follows:
Expiration. Plumbing permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. (Ord. 0-19-1357, 11-13-2019)
25.04.05: AMENDMENT OF SECTION 104.4.5:
Notwithstanding the provisions of section 25.04.01 of this article, section 104.4.5 of the Plumbing Code is amended to read as follows:
Suspension or Revocation. The Building Official or his/her designee may, in writing, suspend or revoke a permit issued under the provisions of this Code whenever the permit is issued in error or on the basis of incorrect information supplied or in violation of other ordinances or regulations of the City.
PAGE 219 of 623
(Ord. 0-19-1357, 11-13-2019)
25.04.06: AMENDMENT OF SECTION 104.5:
Notwithstanding the provisions of section 25.04.01 of this article, section 104.5 of the Plumbing Code is amended to read as follows:
104.5 Permit Fees. All fees pursuant to the Plumbing Code as set forth in Table No. 104.5 shall be established by resolution of the City Council.
104.5.1 Whenever any work for which a permit is required by the Plumbing Code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.
104.5.2 An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the Plumbing Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Plumbing Code nor from any penalty prescribed by law. 104.5.3 Fee Refunds.
104.5.3(1) The Building Official may authorize the refunding of any fee paid hereunder which was erroneously paid or collected.
104.5.3(2) The Building Official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Plumbing Code.
104.5.3(3) The Building Official shall not authorize the refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
(Ord. 0-19-1357, 11-13-2019)
25.04.07: AMENDMENT OF SECTION 105.2.6:
Notwithstanding the provisions of section 25.04.01 of this article, the fourth paragraph of section 105.2.6 of the Plumbing Code is amended to read as follows:
To obtain reinspection, the applicant shall file an application therefor in writing upon a form furnished for that purpose and pay the reinspection fee established by resolution of the City Council.
(Ord. 0-19-1357, 11-13-2019)
25.04.08: AMENDMENT OF SECTIONS 106.1 AND 106.3:
Notwithstanding the provisions of section 25.04.01 of this article, sections 106.1 and 160.3 of the Plumbing Code are amended to read as follows:
PAGE 220 of 623
106.1 Violations. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, or maintain any plumbing or permit the same to be done in violation of the Plumbing Code. 106.3 Penalties. Any person, firm or corporation violating any provision of the Plumbing Code shall be deemed guilty of a misdemeanor, and, upon conviction thereof, shall be punishable as provided in Section 01.04.03 A of this Code. Each separate day or any portion thereof, during which any violation of this code occurs or continues, shall be deemed to constitute a separate offence.
(Ord. 0-19-1357, 11-13-2019)
25.04.09: AMENDMENT OF SECTION 203.0:
Notwithstanding the provisions of section 25.04.01 of this article, section 203.0 of the Plumbing Code is amended by revising the following definitions to read as follows:
Accessible. "Accessible," when applied to a fixture, connection, appliance, or equipment, shall mean having access thereto, but which first may require the removal of an access panel, door, or similar obstruction; "readily accessible" shall mean direct access without the necessity of removing any panel, door, or similar obstruction. Attic and underfloor areas are to be considered "accessible."
Authority Having Jurisdiction. Whenever the term "Authority Having Jurisdiction" is used in the Plumbing Code, it shall mean the Building Official or his/her authorized representative. (Ord. 0-19-1357, 11-13-2019)
25.04.10: ADDITION AMENDMENT OF SECTION 312.13:
Notwithstanding the provisions of section 25.04.01 of this article, section 312.13 is added to the Plumbing Code read as follows:
312.13 Soil, waste, water or other pipe or conduit, except downspouts, shall not be installed or permitted on the outside of a building unless the Building Official deems it necessary. (Ord. 0-19-1357, 11-13-2019)
25.04.11: ADDITION AMENDMENT OF SECTION 511.0:
Notwithstanding the provisions of section 25.04.01 of this article, section 511 is added to the Plumbing Code read as follows:
511.0 No vent shall terminate in a location that is visible from the parkway across the street from the subject property, or to the side elevation facing a side street on a corner lot unless the Building Official deems it necessary.
(Ord. 0-19-1357, 11-13-2019)
25.04.12: ADDITION OF SECTION 713.8:
PAGE 221 of 623
Notwithstanding the provisions of section 25.04.01 of this article, section 713.8 is added to the Plumbing Code read as follows:
713.8 The City Engineer shall determine the availability of the sewer lines. No person shall construct, or enlarge a new or existing cesspool if a sewer line has been declared available. (Ord. 0-19-1357, 11-13-2019)
25.04.13: ADDITION AMENDMENT OF SECTION 906.8:
Notwithstanding the provisions of section 25.04.01 of this article, section 906.8 is added to the Plumbing Code to read as follows:
906.8 No vent shall terminate in a location that is visible from the parkway across the street from the subject property, or to the side elevation facing a side street on a corner lot unless the Building Official deems it necessary.
(Ord. 0-19-1357, 11-13-2019)
Section 5. New Article 05 Mechanical Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 05
MECHANICAL CODE
SECTION:
25.05.01: Mechanical Code Adopted
25.05.02: Amendment Of Section 1043.43
25.05.03: Amendment Of Sections 104.3.2 And 104.3.3
25.05.04: Amendment Of Sections 104.4.3 And 104.4.5
25.05.05: Amendment Of Section 104.5
25.05.06: Amendment Of Section 107.1
25.05.07: Amendment Of Section 106.0
25.05.01: MECHANICAL CODE ADOPTED:
Except as hereinafter provided, the California Mechanical Code, 20252 Edition, based on the 20241 Uniform Mechanical Code as published by the International Association of Plumbing and Mechanical Officials, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Mechanical Code of the City. A copy of such Code shall be located in the office of the City Clerk and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. For the purposes of this Code, the Building Official shall be the Building Official. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.05.02: AMENDMENT OF SECTION 1043.3:4
PAGE 222 of 623
Notwithstanding the provisions of section 25.05.01 of this article, section 103.3 of the Mechanical Code is amended to include an additional paragraph to read as follows:
The Building Official shall review applications, plans, specifications, computations and other data filed by an applicant for a permit. Such plans may be reviewed by other departments of this City to verify compliance with applicable laws under their jurisdiction. If the Building Official finds that the work described in an application for a permit and the plans, specifications and other data filed therewith conform to the requirements of the Mechanical Code and other pertinent laws and ordinances and that the fees established by Resolution of the City Council have been paid, the Building Official shall issue a permit therefor to the applicant. (Ord. 0-19-1357, 11-13-2019)
25.05.03: AMENDMENT OF SECTIONS 104.3.2 AND 104.3.3:
Notwithstanding the provisions of section 25.05.01 of this article, sections 104.3.2 and 104.3.3 of the Mechanical Code are amended to read as follows:
104.3.2 Plan Review Fees. When a plan or other data are required to be submitted by this code a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for mechanical work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. The plan review fees specified in this subsection are separate fees from the permit fees specified in Section 104.5 and are in addition to the permit fees.
When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council. 104.3.3 Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration the applicant shall resubmit plans and pay a new plan review fee.
(Ord. 0-19-1357, 11-13-2019)
25.05.04: AMENDMENT OF SECTIONS 104.4.3 AND 104.4.5:
Notwithstanding the provisions of section 25.05.01 of this article, sections 104.4.3 and 104.4.5 of the Mechanical Code are amended to read as follows:
104.4.3 Expiration. Mechanical permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the PAGE 223 of 623
permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once.
104.4.5 Suspension or Revocation. The Building Official may, in writing, suspend or revoke a permit issued under the provisions of the City Code whenever the permit is issued in error or on the basis of incorrect information supplied or in violation of other ordinances or regulations of the City.
(Ord. 0-19-1357, 11-13-2019)
25.05.05: AMENDMENT OF SECTION 104.5:
Notwithstanding the provisions of section 25.05.01 of this article, section 104.5 of the Mechanical Code is amended to read as follows:
104.5 FEES.
All fees pursuant to the Mechanical Code shall be as established by and set forth in a resolution of the City Council.
104.5.1 Permit Fees. All fees pursuant to the Mechanical Code shall be as amended and established by resolution of the City Council.
104.5.2 Investigation. Whenever any work which requires a permit pursuant to the Mechanical Code has been commenced without first obtaining said permit, a special Investigation shall be made before a permit may be issued for such work.
104.5.2.1 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit fee is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the City Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Mechanical Code nor from any penalty prescribed by law. 104.5.3 Fee Refunds.
104.5.3(1) The Building Official may authorize the refunding of any fee paid hereunder that was erroneously paid or collected.
104.5.3(2) The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Mechanical Code.
104.5.3(3) The Planning and Building Department shall not authorize refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
(Ord. 0-19-1357, 11-13-2019)
25.05.06: AMENDMENT OF SECTION 107.1:
PAGE 224 of 623
Notwithstanding the provisions of section 25.05.01 of this article, section 107.1 of the Mechanical Code is hereby amended to read as follows:
107.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of the Mechanical Code, there shall be and is hereby created a Board of Appeals consisting of the members of the City Council.
The Building Official shall be an ex officio member of and shall act as Secretary to said Board but shall have no vote on any matter before the Board. The Board shall adopt rules of procedures for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the Building Official. The Board may request the services of members of the community who are qualified by experience and training to interpret matters pertaining to the Mechanical Code to act as technical assistants to the Board. Technical assistants shall have no vote on any matter before the Board.
(Ord. 0-19-1357, 11-13-2019)
25.05.07: AMENDMENT OF SECTION 106.0:
Notwithstanding the provisions of section 25.05.01 of this article, section 106.0 of the Mechanical Code is amended to read as follows:
106.10 Violations. It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, impound, remove, convert or demolish, equip, use or maintain mechanical systems or equipment or cause or permit the same to be done in violation of the Mechanical Code.
It is hereby declared that any violation of the Mechanical Code constitutes a public nuisance, and in addition to any other remedies provided by the Mechanical Code for its enforcement, the administrative authority may bring civil suit to enjoin the violation of any provisions of the Mechanical Code.
Any person, firm or corporation violating any of the provisions of the Mechanical Code shall be deemed guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in Section 01.04.03 A of this Code. Each separate day or any portion thereof during which violation of the Mechanical Code occurs or continues shall be deemed to constitute a separate offense, and upon conviction thereof shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
Section 6. New Article 06 Electrical Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 06
ELECTRICAL CODE
SECTION:
25.06.01: Electrical Code Adopted
25.06.02: Amendment Of Article 100
25.06.03: Fees And Expiration
PAGE 225 of 623
25.06.04: Additions To Electrical Code
25.06.05: Service Entrance Panels
25.06.06: Grounding And Bonding Connections
25.06.07: Use Of Factory Assembled Conduits
25.06.08: Use Of Aluminum
25.06.09: Service Entrance - Services
25.06.10: Amendment To Section 250.50
25.06.11: Addition Of Section 690.19
25.06.12: Violations
25.06.01: ELECTRICAL CODE ADOPTED:
Except as hereinafter provided, the California Electrical Code, 20252 Edition, based on the 20241 National Electrical Code as published by the National Fire Protection Association, including all annexes, is hereby adopted by reference and incorporated herein as though set forth herein in full and shall constitute the Electrical Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.06.02: AMENDMENT OF ARTICLE 100:
Notwithstanding the provisions of section 25.06.01 of this article, article 100 of the Electrical Code is amended by amending the definition of "Accessible, Readily" to read as follows:
Accessible, Readily: (Readily Accessible.) Capable of being reached quickly for operation, renewal, or inspections, without requiring those to whom ready access is requisite to climb over or remove obstacles or to resort to portable ladders, chairs, etc. (See "Accessible.") Attic and crawl spaces are not considered readily accessible.
(Ord. 0-19-1357, 11-13-2019)
25.06.03: FEES AND EXPIRATION:
Notwithstanding the provisions of section 25.06.01 of this article, all fees pursuant to the Electrical Code shall be those amounts established by resolution of the City Council.
Plan Review Fees. When a plan or other data are required to be submitted by this code a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for electrical work shall be equal to 100 percent of the total permit fee as established by resolution of the City Council. The plan review fees specified in this subsection are separate fees from the permit fees and are in addition to the permit fees. When plans are incomplete or changed so as to require additional plan review, a fee shall be charged in the amount established by resolution of the City Council.
Expiration of Plan Review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 PAGE 226 of 623
days upon request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration the applicant shall resubmit plans and pay a new plan review fee.
Investigation. Whenever any work which requires a permit pursuant to the Electrical Code has been commenced without first obtaining said permit, a special Investigation shall be made before a permit may be issued for such work.
Investigation Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit fee is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee that would be required by the City Code if a permit were to be issued. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the Electrical Code nor from any penalty prescribed by law.
Fee Refunds. The Building Official may authorize the refunding of any fee paid hereunder that was erroneously paid or collected. The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the Electrical Code. The Planning and Building Department shall not authorize refunding of any fee paid except upon written application filed by the original permittee not later than one hundred eighty (180) days after the date of fee payment.
Expiration. Electrical permits will remain valid if the work on the site authorized by that permit is commenced within 12 months after its issuance, unless the permittee has abandoned the work authorized by the permit. Before such work can be recommenced, the permit shall first be renewed, provided no changes have been made or will be made in the original plans and specifications for such work. If an applicant wishes to renew a permit that has been expired for less than 180 days, 50% of the original fees paid shall be required to renew the permit. If an applicant wishes to renew a permit that has been expired for more than 180 days, 100% of the original fees paid shall be required to renew the permit. The Building Official may extend the permit expiration date for a period not exceeding 180 days on written request (submitted prior to the expiration date) by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. (Ord. 0-19-1357, 11-13-2019)
25.06.04: ADDITIONS TO ELECTRICAL CODE:
Notwithstanding the provisions of section 25.06.01 of this article, the Electrical Code is amended by adding the sections as set forth in sections 25.06.05 through 25.06.11 of this article. (Ord. 0-19-1357, 11-13-2019)
25.06.05: SERVICE ENTRANCE PANELS:
A. All new residences shall be provided with a minimum service capacity of not less than two hundred (200) amperes main. Service conduit shall be two-inch (2") conduit.
B. On existing dwellings if the service is replaced, the minimum service shall be one hundred (100) amperes main. Service conduit shall be one and one-half inches (1-½").
PAGE 227 of 623
C. Branch circuit panel shall contain space for a minimum of twenty (20) single pole overcurrent devices.
(Ord. 0-19-1357, 11-13-2019)
25.06.06: GROUNDING AND BONDING CONNECTIONS:
A. The connection of grounding conductor to grounding electrode shall be readily accessible.
B. The connection of the bond from the grounding conductor to the cold water and gas systems shall be readily accessible.
C. All conduit shall contain a green ground wire.
(Ord. 0-19-1357, 11-13-2019)
25.06.07: USE OF FACTORY ASSEMBLED CONDUITS:
Notwithstanding any provision of the Electrical Code to the contrary, the following is prohibited in new installations:
A. Factory assembled conduits, such as:
1. Mineral insulated sheathed cable.
2. Armored cable unless:
a. Factory assembled in an Underwriters Laboratory approved fixture; b. Green insulated copper grounding conductor; and
c. Is used for applications not to exceed nine feet (9') from a power source to a single fixture.
3. Extension of any knob and tube.
(Ord. 0-19-1357, 11-13-2019)
25.06.08: USE OF ALUMINUM:
Notwithstanding any provision of the Electrical Code to the contrary, the following are prohibited in new installations:
A. Aluminum wire is not permitted.
B. Aluminum conduit is not approved as a self-grounding conduit. (Ord. 0-19-1357, 11-13-2019)
25.06.09: SERVICE ENTRANCE - SERVICES:
A. New service entrance conductors on all commercial buildings shall be installed underground.
B. A contractor licensed C-10 or B-1 must apply for the permit for any new service or service change out.
PAGE 228 of 623
(Ord. 0-19-1357, 11-13-2019)
25.06.10: AMENDMENT TO SECTION 250.50:
Notwithstanding the provisions of section 25.06.01 , an additional exception is added to section 250.50 to read as follows:
Exception: Grounding of electrical services replaced in existing residential buildings.
When an electrical service in an existing R1 or R3 occupancy is replaced or upgraded, and the material of the water pipe in direct contact with the earth is unknown, the connection of the grounding conductor to the interior metal water pipe may be made at any accessible point, provided that at least one grounding electrode of a type specified in Sections 250.50 or 250.52 is installed as close as possible to the service and connected directly to the service equipment with an independent grounding electrode conductor.
(Ord. 0-19-1357, 11-13-2019)
25.06.11: ADDITION OF SECTION 690.19:
Notwithstanding the provisions of Section 25.06.01 , Section 690.19 is added to the Electrical Code to read as follows:
690.19 Disconnecting Means for Multiple Arrays. Where more than one array is combined to form a single output rated more than 50 volts and/or 10 amperes, a disconnecting means rated for the output shall be installed immediately adjacent to the combiner box on the output side.
Exception: If the combiner box is located adjacent to the inverter(s), the disconnecting means as stated above shall not be required.
(Ord. 0-19-1357, 11-13-2019)
25.06.12: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of the Electrical Code shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this Code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation of any provision of the Electrical Code is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided. (Ord. 0-19-1357, 11-13-2019)
Section 7. New Article 07 Seismic Retrofit Of Unreinforced Masonry Buildings is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 07
SEISMIC RETROFIT OF UNREINFORCED MASONRY BUILDINGS
SECTION:
25.07.01: Seismic Safety Commission Draft Model Ordinance Adopted PAGE 229 of 623
25.07.02: Copies Available
25.07.03: Penalties
25.07.01: SEISMIC SAFETY COMMISSION DRAFT MODEL ORDINANCE ADOPTED:
The State of California Seismic Safety Commission Draft Model Ordinance, February 1990 Edition, as amended and in effect on November 1, 1990, is hereby adopted by reference as the Seismic Safety Ordinance of the City. (Ord. 984, 2-13-91)
25.07.02: COPIES AVAILABLE:
A copy of the Seismic Safety Commission Draft Model Ordinance, February 1990 Edition, has been deposited in the office of the City Clerk and shall be, at all times, maintained by the Clerk for the public's use and examination. (Ord. 984, 2-13-91)
25.07.03: PENALTIES:
Any person who shall violate any of the provisions of this Article or fail to comply therewith or who shall violate or fail to comply with any order made thereunder or who shall build in violation of any detailed statement of specifications or plans submitted and approved thereunder or any certificate or permit issued thereunder, and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the Planning Commission, City Council or by a court of competent jurisdiction within the time fixed herein shall severally, on each and every such violation and noncompliance, respectively, be guilty of a misdemeanor and shall be punishable as provided in Section 01.04.03A of this Code. (Ord. 984, 2-13-91) Section 8. New Article 08 Miscellaneous is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 08
MISCELLANEOUS
SECTION:
25.08.01: Building Relocation Permit
25.08.02: Building Mover's Permit
25.08.03: General Liability Insurance Coverage
25.08.04: Street Address Numbers
25.08.01: BUILDING RELOCATION PERMIT:
A. Permit Required: No person may relocate a building or structure, or any portion thereof, onto or within a site within City limits unless the person who owns or has legal control of the site has first obtained a building relocation permit as provided in this Section.
B. Application for Permit: An applicant for a building relocation permit shall complete and submit to the City an application package consisting of the following documents:
1. An application form completed and signed by the person who owns or has legal control of the site. The completed application shall include the name of the owner, the type of structure, the value and approximate age of the building, description of any alteration, repair work or other work, PAGE 230 of 623
if any, to be performed on the building after relocation and any other necessary information requested by City staff.
2. A set of working drawings, electrical and mechanical plans, complete specifications and any other documents requested by City staff which show, at a minimum, site preparation, floor plans, elevations and other construction details.
3. A set of photographs, not less than five inches by seven inches (5" x 7") in dimension, of all sides of the building showing its general architectural design and appearance.
4. An application fee in an amount set by the City Council to cover the cost to the City of issuing the permit and monitoring the relocation.
C. Hearing; Notice: Upon the filing of such application, a hearing shall be set before the Planning Commission. Notice of the time and place of such hearing and the purpose thereof shall be given by the mailing of notices to the owners of all property within three hundred feet (300') of the property to which the building or structure is to be moved. Such mailing of notices shall be completed at least ten (10) days before such hearing.
D. Findings: The Planning Commission shall not grant a building relocation permit if the Planning Commission finds that the building or structure is so old, dilapidated and in such a state of disrepair as to be unsanitary or otherwise unfit for human habitation, occupancy or use or would, by reason of its external appearance, not be compatible with the neighborhood in its new location.
Before granting approval of a proposed relocation, the applicant therefor shall affirmatively show or prove, and the Commission shall so find, that all the following conditions are met:
1. The structure is in conformity with the type and quality of buildings existing in the surrounding area of the proposed site.
2. The structure will constitute a beneficial addition to and contribute to the general development of the area.
3. The proposed relocation will not conflict with any of the property development standards of this Code.
4. The structure proposed to be relocated is completely free of pest infestation as certified by a qualified pest extermination firm.
5. The proposed relocation will in no way be detrimental to persons, to properties or to the living environment of the area.
6. That the proposed relocation will not adversely affect any streets, parkway trees or other improvements in the area.
7. The proposed relocation is consistent with the General Plan of the City.
E. Commission Action: The Commission may approve, conditionally approve or deny the request for relocation based on the evidence submitted and its own study and knowledge of the circumstances.
PAGE 231 of 623
F. Conditions of Approval: The Commission may approve a proposed relocation subject to such conditions as the Commission may deem warranted by the circumstances involved. Such conditions may include, but are not limited to, any or all of the following:
1. Dedication and improvement of streets which may include curb, gutters, sidewalk and paving.
2. A faithful performance bond guaranteeing the applicant will complete the relocation and will meet all conditions prior to occupancy. Said deposit or bond shall also be sufficient to cover the costs of all matters involving the City, such as inspections, engineering, street and other improvements, and restoration of the vacated site if located within the City.
G. Time Limits: All work will be completed within one hundred eighty (180) days after approval is granted. The Planning Commission can grant one extension of ninety (90) days if the applicant shows that circumstances beyond the control of the applicant caused the delay.
H. Permit Supplemental to Other Laws: The permit required by the provisions of this Section shall be in addition to any other permit required by any other law of the City or any governmental agency having jurisdiction.
I. Inspections: All relocated buildings or structures shall be subject to inspection by the Building and Safety Department and shall conform to all the requirements of the Building Code 1 and other codes and laws relating to buildings and construction and the necessary installations incident thereto.
J. Appeals:
1. Filing: Any person aggrieved by the decision of the Planning Commission may file an appeal to the City Council within fifteen (15) days after the date such action is taken by the Planning Commission. Such appeal shall be in writing and shall be filed with the City Clerk.
2. Review: Upon the filing of any such appeal, the City Council may either affirm the action of the Planning Commission, set the matter for a hearing de novo or request a copy of the relevant information submitted to the Planning Commission and a copy of the minutes of the Planning Commission meeting and decide the matter on the record. If a hearing de novo is held, a hearing shall be set forth before the Council. Notice of the time and place of such hearing and the purpose thereof shall be given by the mailing of notices to the owners of all property contiguous to the property to which the building or structure is to be moved. Such mailing of notices shall be completed at least ten (10) days before such hearing.
3. Determinations: If the City Council holds a hearing de novo or considers the matter on the record before the Planning Commission, the City Council shall consider the application on the standards contained in subsection D hereof.
K. Exceptions: Upon a proper showing, the City Council may modify the requirements of this Section or may waive or reduce the permit application fees where the building or structure to be moved is owned or is to be used or occupied by another public agency and is already located within the City limits or where the building or structure is so small as to not have any negative impact on surrounding properties. (Ord. 992, 7-10-91)
PAGE 232 of 623
Notes
1 1. See Article 02 of this Chapter.
25.08.02: BUILDING MOVER'S PERMIT:
A. Permit Required: No person shall move any building or structure or any portion thereof over, upon, along or across any street without first obtaining a building mover's permit.
B. Application for Permit: The applicant shall complete and submit to the Planning and Building Department an application package consisting of the following documents:
1. An application form completed and signed by the person who intends to move the building.
The completed application shall include the name of the owner, the type of structure, its present and proposed location, the fair value and approximate age of the building, the proposed route, the method of moving, impact on parkway trees, the time within which the work of moving shall be commenced and completed, proof that all the necessary authority and permits have been obtained from the public utilities which may be affected by such moving operations and any other necessary information requested by City staff.
2. That the contractor furnish the City with a policy or certificate of liability insurance in which the City is named insured. The minimum amount shall be two hundred fifty thousand dollars ($250,000.00) of property damage insurance and of personal liability insurance with a combined single amount of no less than one million dollars ($1,000,000.00). The policies shall otherwise be prepared in accordance with the latest edition of the Standard Specifications for Public Works Construction, section 7-3.
3. An application fee in an amount to be set by the City Council, from time to time, to cover the cost to the City of issuing the permit and monitoring the relocation.
4. Evidence of workers' compensation insurance.
C. Review of Application: The City Manager, the Director of Planning and BuildingCommunity Development Director and the Director of Public Works must review and approve the application. The application may be approved subject to conditions deemed necessary.
D. Permit Revocation: After the permit is issued, the Planning and Building Department shall monitor the relocation, and if any violations of the permit conditions are found, the City Manager may revoke the permit.
E. Expiration of Permit: Every building mover's permit issued pursuant to this Section shall contain each and every term and condition imposed by the City and shall be valid for a period of ninety (90) days after which it shall expire without further notice. (Ord. 992, 7-10-91)
25.08.03: GENERAL LIABILITY INSURANCE COVERAGE:
No individual or business employing any worker or possessing a State contractor's license shall be issued a building permit or an encroachment permit by the City for any building activity valued at more than two hundred dollars ($200.00) as provided for in this Code or for the encroachment upon any public right of way without having first provided written proof of possession of current PAGE 233 of 623
general liability insurance coverage in an amount and form to be established by the City Engineer 1 . (Ord. 911, 1-14-87)
Notes
1 1. West's Ann.Cal.Stats.Gov. Code §53080.5.
25.08.04: STREET ADDRESS NUMBERS:
Assigned street address numbers shall be placed or displayed on or near the front of each home or building facing the public street or thoroughfare on which it is located. Said numbers shall be arabic numerals at least three inches (3"4) high and of corresponding width. All numbers shall be placed in a location clearly visible from the street or thoroughfare after the person owning or occupying the premises shall have been notified by the Planning and Building DirectorCommunity Development Director of the appropriate street address numbers. If a public alley or thoroughfare abuts the rear of a commercial building, the street address numbers shall also be placed at the rear of the building in such a manner that they are visible from the public alley or thoroughfare. (Ord. 917, 5-13-87)
Section 9. New Article 09 Energy Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 09
ENERGY CODE
SECTION:
25.09.01: Energy Code Adopted
25.09.02: Violations
25.09.01: ENERGY CODE ADOPTED:
Except as hereinafter provided, the California Energy Code, 20252 Edition, as published by the California Building Standards Commission, including all appendices, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Energy Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.09.02: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of this article shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this Code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation of any provision of this article is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided.
PAGE 234 of 623
(Ord. 0-19-1357, 11-13-2019)
Section 10. New Article 10 Administrative Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 10
ADMINISTRATIVE CODE
SECTION:
25.10.01: Administrative Code Adopted
25.10.01: ADMINISTRATIVE CODE ADOPTED:
Except as hereinafter provided, the California Administrative Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Administrative Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 11. New Article 11 Floodplain Management is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 11
FLOODPLAIN MANAGEMENT
SECTION:
25.11.01: Definitions
25.11.02: Lands To Which This Article Applies
25.11.03: Basis For Establishing Flood Prone Areas
25.11.04: Compliance
25.11.05: Abrogation And Greater Restrictions
25.11.06: Interpretation
25.11.07: Warning And Disclaimer Of Liability
25.11.08: Establishment Of Development Permit
25.11.09: Duties And Responsibilities Of The Floodplain Administrator
25.11.10: Standards Of Construction
25.11.11: Standards For Subdivisions Or Other Proposed New Development
25.11.12: Standards For Utilities
25.11.01: DEFINITIONS:
Unless specifically defined in this section, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common usage and to give this article its most reasonable application.
PAGE 235 of 623
AREA OF SPECIAL FLOOD HAZARD: The land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year.
BASE FLOOD: A flood which has a one percent (1%) chance of being equaled or exceeded in any given year (also called the "100-year flood"). Base flood is the term used throughout this article.
BUILDING: Any structure.
DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.
FLOOD OR FLOODING:
A. A general and temporary condition of partial or complete inundation of normally dry land areas from: the overflow of inland or tidal waters; the unusual and rapid accumulation or runoff of surface waters from any source; or mudslides (i.e., mudflows) which are proximately caused by flooding as defined herein and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current; or
B. The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusual and unforeseeable event which results in flooding as defined in this definition.
FLOODPLAIN ADMINISTRATOR: The planning and building directorCommunity Development Director, who is hereby appointed to administer, implement, and enforce this article by granting or denying development permits in accord with its provisions.
FLOODPLAIN MANAGEMENT: The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing, where possible, natural resources in the floodplain, including, but not limited to, emergency preparedness plans, flood control works, floodplain management regulations, and open space plans.
FLOODPLAIN MANAGEMENT REGULATIONS: This article and all other provisions of this code that control development in flood prone areas, and any other federal, state, or local regulations or combination thereof which provide standards for preventing and reducing flood loss and damage.
FLOODPLAIN OR FLOOD PRONE AREA: Any land area susceptible to being inundated by water from flooding.
HISTORIC STRUCTURE: Any structure that is:
A. Listed individually in the National Register of Historic Places (a listing maintained by the department of the interior) or preliminarily determined by the secretary of the interior as meeting the requirements for individual listing on the national register; PAGE 236 of 623
B. Certified or preliminarily determined by the secretary of the interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary of the interior to qualify as a registered historic district; C. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the secretary of the interior; or D. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the secretary of the interior or directly by the secretary of the interior in states with approved programs.
NEW CONSTRUCTION: For floodplain management purposes, means structures for which the "start of construction" commenced on or after the effective date of floodplain management regulations adopted by this community, and includes any subsequent improvements to such structures.
100-YEAR FLOOD: See definition of Base Flood.
START OF CONSTRUCTION: Includes substantial improvement and other proposed new development and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within one hundred eighty (180) days from the date of the permit. The "actual start" means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the "actual start of construction" means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STRUCTURE: A walled and roofed building that is principally aboveground, or a gas or liquid storage tank.
SUBSTANTIAL DAMAGE: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT: Any reconstruction, rehabilitation, addition, or other proposed new development of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include either:
A. Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or PAGE 237 of 623
B. Any alteration of a "historic structure", provided that the alteration will not preclude the structure's continued designation as a "historic structure". (Ord. 0-06-1185, 7-12-2006)
25.11.02: LANDS TO WHICH THIS ARTICLE APPLIES:
This article shall apply to all areas identified as flood prone within the jurisdiction of the city of San Marino. (Ord. 0-06-1185, 7-12-2006)
25.11.03: BASIS FOR ESTABLISHING FLOOD PRONE AREAS:
The floodplain administrator shall obtain, review, and reasonably utilize any base flood data available from other federal or state agencies or other source to identify flood prone areas within the jurisdiction of the city of San Marino. This data will be on file at city hall, 2200 Huntington Drive, San Marino, California. (Ord. 0-06-1185, 7-12-2006)
25.11.04: COMPLIANCE:
No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the terms of this article and other applicable regulations. Violation of the requirements of this article or any conditions and safeguards imposed pursuant to this article shall constitute a misdemeanor. Nothing herein shall prevent the city council from taking such lawful action as is necessary to prevent or remedy any violation of this article. (Ord. 0-06-1185, 7-12- 2006)
25.11.05: ABROGATION AND GREATER RESTRICTIONS:
This article is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this article and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restriction shall prevail. (Ord. 0-06-1185, 7-12-2006)
25.11.06: INTERPRETATION:
In the interpretation and application of this article, all provisions shall be:
A. Considered as minimum requirements;
B. Liberally construed in favor of the city; and
C. Deemed neither to limit nor repeal any other powers granted under state statutes. (Ord. 0- 06-1185, 7-12-2006)
25.11.07: WARNING AND DISCLAIMER OF LIABILITY:
The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This article shall not make the city of San Marino, the city council, or any officer or employee of the city, the state of California, or the federal insurance administration, federal emergency management agency, liable for any flood PAGE 238 of 623
damages that result from reliance on this article or any administrative decision lawfully made hereunder. (Ord. 0-06-1185, 7-12-2006)
25.11.08: ESTABLISHMENT OF DEVELOPMENT PERMIT:
A development permit shall be obtained for all proposed construction or other development so that it may be determined whether such construction or other development is within flood prone areas. (Ord. 0-06-1185, 7-12-2006)
25.11.09: DUTIES AND RESPONSIBILITIES OF THE FLOODPLAIN ADMINISTRATOR:
The duties and responsibilities of the floodplain administrator shall include, but not be limited to, the following:
A. Permit Review: Review all development permit applications to determine whether:
1. The requirements of this article have been satisfied;
2. All other required state and federal permits have been obtained; and
3. The site is reasonably safe from flooding.
B. Review And Use Of Any Other Base Flood Data: The floodplain administrator shall obtain, review, and reasonably utilize any base flood data available from other federal or state agency or other source. (Ord. 0-06-1185, 7-12-2006)
25.11.10: STANDARDS OF CONSTRUCTION:
If a proposed building site is in a flood prone area, all new construction and substantial improvements shall:
A. Be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
B. Be constructed:
1. With materials and utility equipment resistant to flood damage;
2. Using methods and practices that minimize flood damage;
3. With electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (Ord. 0-06-1185, 7-12-2006)
25.11.11: STANDARDS FOR SUBDIVISIONS OR OTHER PROPOSED NEW DEVELOPMENT:
Any application for a subdivision or parcel map or for any other development in a flood prone area shall be reviewed to assure that:
PAGE 239 of 623
A. The development project is consistent with the need to minimize flood damage within the flood prone area;
B. All public utilities and facilities such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage; and C. Adequate drainage is provided to reduce exposure to flood hazards. (Ord. 0-06-1185, 7-12- 2006)
25.11.12: STANDARDS FOR UTILITIES:
A. All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate:
1. Infiltration of floodwaters into the systems, and
2. Discharge from the systems into floodwaters.
B. On site waste disposal systems shall be located to avoid impairment to them, or contamination from them during flooding. (Ord. 0-06-1185, 7-12-2006) Section 12. New Article 12 Fire Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 12
FIRE CODE
SECTION:
25.12.01 Fire Code Adopted
25.12.02 Amendment of Section 107.2108.2
25.12.03 Addition of Section 107.2.3108.2.3
25.12.04 Deletion of Section 111.1 112.1 and Addition of Section 111.5112.5
25.12.05 Amendment of Section 112.4113.4
25.12.06 Addition of Section 304.1.2.1
25.12.0607 Addition of Section 307.6
25.12.0708 Addition of Section 308.1.4.1
25.12.0809 Addition of Section 506.1.3
25.12.0910 Amendment of Section 903.2
25.12.1011 Amendment of Section 903.2.8.1
25.12.1112 Amendment of Section 903.2.18
25.12.1213 Addition of Section 903.3.1.3.1
25.12.1314 Amendment of Section 903.4.1
25.12.1415 Addition of Section 906.1.1
25.12.1516 Addition of Section 907.2.A
25.12.17 Amendment of Section 907.2.9.1
25.12.1618 Deletion of Section 907.6.6, Exception 3
25.12.1719 Amendment of Section 912.2
PAGE 240 of 623
25.12.18 20 Amendment of Section 3103.2
25.12.19 Addition of Section 4907.4
25.12.2021 Addition of Section 5608.2
25.12.01: FIRE CODE ADOPTED: Except as hereinafter provided, the 2022 2025 California Fire Code, including all appendices with errata, based on the 2021 2024 International Fire Code, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Fire Code of the City. A copy of such code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. For the purpose of this Code, the Planning and Building DirectorCommunity Development Director shall be the building official.
25.12.02: AMENDMENT OF SECTION 107.2108.2: Notwithstanding the provisions of Section
25.12.01 of this article, Section 107.2108.2 of the Fire Code is hereby amended to read as follows:
107.2108.2 Establishment of Fees. All fees pursuant to the fire code shall be established by resolution of the city council.
25.12.03: ADDITION OF SECTION 107.2.3108.2.3: Notwithstanding the provisions of Section
25.12.01 of this article, Section 107.2.3108.2.3 is added to the Fire Code to read as follows:
107.2.3108.2.3 Annual Inspection Required. All properties located in the high fire hazard severity zone as identified by the San Marino Fire Department shall be inspected as deemed necessary for compliance with state and local brush clearance requirements in Section
12.12.1912.12.06 by the fire official.
25.12.04: DELETION OF SECTION 111.1112.1 AND ADDITION OF SECTION 111.5112.5: Notwithstanding the provisions of section 25.12.01 of this article, Section 111.1 of the Fire Code is deleted and Section 111.5112.5 is added to the Fire Code to read as follows:
111.5112.5 Appeals. Whenever the fire chief disapproves an application or refuses to grant a permit applied for, or when it is claimed that the provisions of the fire code do not apply or that the true intent and meaning of the fire code have been misconstrued or wrongly interpreted, the applicant may appeal the fire chief's decision to the city manager within thirty (30) days from the date of the decision. If the city manager upholds the decision of the fire chief, the applicant may appeal the decision to the city council by filing a notice of appeal with the city clerk within ten (10) days from the date of the city manager's decision.
25.12.05: AMENDMENT OF SECTION 112.4113.4: Notwithstanding the provisions of Section
25.12.01 of this article, Section 112.4113.4 of the Fire Code is amended to read as follows:
112.4113.4 Violation Penalties. Persons who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter, repair, or do work in violation of the approved construction document or directive of the fire code official, or of a permit or certificate used under provisions of this code, shall be guilty of a misdemeanor, punishable by a fine as established by the city council or by imprisonment, or both such fine and imprisonment.
Each day that a violation continues after due notice has been served shall be deemed a separate offense. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue; and all such persons shall be required to correct or remedy such violations or defects PAGE 241 of 623
in a timely manner as specified by the chief or authorized representative. The application of the above penalties shall not be held to prevent the enforced removal of prohibited conditions.
25.12.1925.12.06: ADDITION OF SECTION 4907.4304.1.2.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 4908304.1.2.1 is added to the Fire Code to read as follows:
Section 4907.4 304.1.2.1 Clearance of Hazardous Vegetation from Structures and Roads within the City of San Marino.
4907.4.1304.1.2.1.1 Statement of Legislative Intent and Purpose. It is the objective of this section to promote and protect the public health, safety and welfare by recognizing that there exists within the city of San Marino a potentially hazardous fire situation created by grass, weeds, shrubs, and trees which are in such condition and location as to provide a ready fuel supply to augment the spread or intensity of fire. It is the intent of this section to provide minimum standards to safeguard life, safety, property and the public welfare by insuring that hazardous vegetation or refuse is removed and that all grass, weeds, shrubs, and trees are properly maintained so as to not create a fire hazard within the community, while maintaining sufficient vegetation for aesthetic and soil erosion control purposes.
It is the further intent that this section apply on a year-round basis to insure the removal and/or proper maintenance of grass, weeds, shrubs, trees and refuse in order to prevent the spread or intensity of fire within the community. Of particular concern is the need to provide adequate defensible space in the urban/wildland interface area of the city, referred to as the high fire hazard severity zone. For purposes of this section, defensible space is that space within 100 feet (30.480 m) of a building or structure that is required for access by fire and other emergency personnel to defend the building or structure from the threat of fire. 4907.4.2 304.1.2.1.2 Prohibition. No person who has any ownership or possessory interest in, or control of a parcel of land shall allow to exist thereon any hazardous refuse or hazardous grass, weeds, shrubs, trees, or other vegetation, which, by reason of proximity to a building or structure, constitutes a fire hazard. For purposes of this section, hazardous grass, weeds, shrubs, trees, or other vegetation are defined as grass, weeds, shrubs, trees, or other vegetation which are in such condition and location, or by the unique characteristics of a species, as to provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.1304.1.2.1.3 Specific Requirements. In order to provide sufficient defensible space, each person who has any ownership or possessory interest in, or control of, a parcel of land shall:
4907.4.3.1304.1.2.1.3.1 General. Remove from the property all hazardous vegetation, except as otherwise provided herein, if such vegetation is within 100 feet (30.480 m) of a building, within ten (10) feet (3.048 m) of a combustible fence, or within ten (10) feet (3.048 m) of any portion of any highway, street, alley, or driveway improved or used for vehicular travel or other vehicular purposes. Distances up to 200 feet (60.960 m) or greater from a building or structure may be necessary as determined by the chief. This requirement does not apply to the maintenance of trees, ornamental shrubbery or plants which are used as ground cover, provided such are landscape materials that are properly irrigated and maintained and do not provide a ready fuel supply to augment the spread or intensity of a fire.
PAGE 242 of 623
4907.4.3.2 304.1.2.1.3.2 Adjacent To Building. Keep all trees, shrubs, and other vegetation or portions thereof, adjacent to or overhanging any building or structure free of dead limbs, branches, and other combustible matter.
4907.4.3.3 304.1.2.1.3.3 Roof Clearance. Maintain 5 feet (1.524 m) of vertical clearance between roof surfaces and portions of trees or shrubs overhanging any building or structure. 4907.4.3.4 304.1.2.1.3.4 Chimney Clearance. Remove any portion of a tree or shrub which extends within 15 feet (4.572 m) of the outlet of a chimney or stovepipe. 4907.4.3.5 304.1.2.1.3.5 Roof Surface. Maintain the roofs of all buildings or structures free of leaves, needles, twigs, and other combustible matter.
4907.4.3.6 304.1.2.1.3.6 Building Clearance--30 Feet. Maintain all hazardous grass, weeds, and small shrubs within 30 feet (9.144 m) of any building or structure. Hazardous vegetation must be maintained less than 3 inches (76 mm) high; cut grass may be left on the slope to protect the soil if it lays down within 3 inches (76 mm) of the ground. Large native shrubs may be retained no closer than an average of 18 feet (5.486 m) apart, provided the lower branches have been trimmed a minimum of 3 feet (914 mm) above the ground, or at least thinned to reduce the available fuel volume.
4907.4.3.7 304.1.2.1.3.7 Roads. Maintain trees and shrubs within 10 feet of that portion of any highway, street, alley, or driveway which is improved or used for vehicle travel or other vehicular purposes (except for designated fire roads), so that no leafy foliage, twigs, or branches are within six (6) feet (1.828 m) of the ground (but no more than 1/3 of the crown). 4907.4.3.8 304.1.2.1.3.8 Combustible Fences. Maintain all hazardous grass, weeds and other vegetation located within 10 feet (3.048 m) of any combustible fence at a height of not more than 3 inches (76 mm). This shall not require the removal of trees, ornamental shrubbery or plants which are used as ground cover, provided such do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.9304.1.2.1.3.9 Building Clearance--100 Feet. Maintain all hazardous grass, weeds, shrubs and trees within 100 feet (30.480 m) of any building or structure. Grass and small shrubs may be retained on steep slopes to stabilize the soil and prevent erosion, but may not exceed a height of 18 inches (457 mm). Large native specimen shrubs should be retained where possible, but no closer than an average of 18 feet (5.486 m) apart. Remove all dead foliage, twigs or branches, or live branches within 3 feet (914 mm) of the ground, from mature trees and shrubs (but no more than 1/3 of the crown).
4907.4.3.10 304.1.2.1.3.10 Cut Vegetation and Refuse. Remove and/or safely dispose of all cut vegetation and hazardous refuse.
4907.4.3.11304.1.2.1.3.11 Soil Erosion Control. If the abatement of hazardous vegetation results in the exposure of bare mineral soil, or the soil is exposed to such an extent that increased soil erosion would be likely, or the chief or his designee determines that the abatement has been excessive and poses a threat to the public health, safety or welfare, irrigation and landscaping or a suitable erosion control structure must be provided to establish effective soil erosion control.
PAGE 243 of 623
4907.4.3.12 304.1.2.1.3.12 Minimum Requirements. Nothing contained in this section shall be deemed to preclude the chief from requiring more than the minimum specific requirements set forth above when the chief determines that conditions exist which necessitate greater fire protection measures.
4907.5 304.1.2.1.5 Notice. The council finds that grass, weeds, shrubs, trees, or other vegetation prohibited under sec. 4908.3 increase the danger of fire and thus constitute a public nuisance. If such condition exists, the San Marino Fire Department shall give notice to the owner of record to abate the nuisance within 30 days. The notice shall state that the owner is required to abate the nuisance and that if the nuisance is not abated the city may take further action which can include, (1) the city, or its contractor, may enter upon the parcel of land and remove or otherwise eliminate or abate the nuisance, (2) that upon completion of such work the cost thereof, including administrative costs, shall become a special assessment against that parcel, and (3) that upon council confirmation of the assessment and recordation of that order, a lien shall attach to the parcel to be collected on the next regular property tax bill levied against the parcel.”
25.12.0625.12.07: ADDITION OF SECTION 307.6: Notwithstanding the provisions of Section
25.12.01 of this article, Section 307.6 is added to the Fire Code to read as follows:
307.6 Outdoor Fireplaces, Fire Pits, And Decorative Fire Features. Outdoor fireplaces, fire pits, and decorative fire features shall be installed and used in accordance with the manufacturer's instructions. Outdoor fireplaces, fire pits, and decorative fire features, as identified under this code section, shall be listed electric and/or gas fuel-fired.
25.12.0725.12.08: ADDITION OF SECTION 308.1.4.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 308.1.4.1 is added to the Fire Code to read as follows:
308.1.4.1 Open-Flame Cooking Devices. Solid fuel, gas fuel-fired barbeques and other openflame cooking devices shall be installed and used in accordance with the manufacturer's instructions. In the absence of manufacturer's instructions, the fire chief or designee has the ability to determine proper installation location clearances and area of operation.
25.12.0825.12.09: ADDITION OF SECTION 506.1.3: Notwithstanding the provisions of Section 25.12.01 of this article, Section 506.1.3 is added to the Fire Code to read as follows:
506.1.3 Key Boxes and Switches. An approved key box or switch shall be installed on all commercial properties and all residential properties where the street access to the site is gated.
25.12.0925.12.10: AMENDMENT OF SECTION 903.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2 of the Fire Code is amended to read as follows:
903.2 Where Required – All Buildings Except R-3 and U Occupancies. a. An automatic fire sprinkler system shall be installed in every new building in the city, hereinafter constructed or moved into the city, regardless of an area separation or type of construction.
Exceptions:
PAGE 244 of 623
1. New buildings less than 720 square feet may be exempt with the concurrence of the fire chief and building official.
b. Building Additions - An automatic fire sprinkler system shall be installed in the entire building when the addition, renovation, repair and/or remodeling of any existing building, when the value thereof exceeds more than fifty percent (50%) of the market value of the existing building. All such additions, renovations, repair or remodeling performed fewer than five (5) years prior to the effective date of this section shall be considered in determining the cumulative value under this section. The value of the proposed construction and of the existing building shall be determined by the building official based upon the latest edition of the "building valuation data" as published by the International Code Council (ICC).
c. Installation, approval and maintenance of automatic fire sprinkler systems shall be in compliance with the National Fire Protection Association Standards and the California Fire Code, as adopted and amended by the City. (Reference the California Fire Code chapter 80 for other adopted standards and California amendments).
d. Automatic fire and fire sprinkler systems shall be installed and maintained at the owner's expense.
e. If the fire chief and the building official determine access for fire apparatus and equipment to any building or structure, not otherwise required hereunder to install and maintain an automatic fire sprinkler system is unduly difficult, installation of an automatic fire-extinguishing system acceptable to the chief shall be required.
25.12.1025.12.11: AMENDMENT OF SECTION 903.2.8.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2.8.1 of the Fire Code is amended to read as follows:
903.2.8.1 Group R-3.
a. A fire sprinkler system shall be installed in all new buildings in the City hereinafter constructed or moved into the City.
Exceptions:
1. R-3 Occupancy Accessory Dwelling Units (ADU’s) as defined by the Government Code Section 65852.2 shall not be required to install fire sprinklers, (pursuant to AB229 and/or SB 1069) when the existing main residence is not equipped with fire sprinklers and is not required to be equipped with automatic fire sprinklers. ADU’s greater than 1,200 square feet will require fire sprinklers.
2. New buildings less than 720 square feet may be exempted with the concurrence of the fire chief and building official.
b. Existing one- and two-family dwellings shall be required to install an automatic fire sprinkler system in the existing and new portions of the building when greater than 720 square feet is added or when additions, alterations, repairs, remodels or the combination thereof exceeds 40% of the existing square footage used for human occupancy. c. Installation, approval and maintenance of automatic fire sprinkler systems shall be in compliance with the National Fire Protection Association Standards and the California Fire Code, PAGE 245 of 623
as adopted and amended by the City. (Reference the California Fire Code chapter 80 for other adopted standards and California amendments).
d. Automatic fire-extinguishing and fire sprinkler systems shall be installed and maintained at the owner's expense.
e. If the fire chief and the building official determine access for fire apparatus and equipment to any building or structure, not otherwise required hereunder to install and maintain an automatic fire sprinkler system is unduly difficult, installation of an automatic fire-extinguishing system acceptable to the chief shall be required.
25.12.1125.12.12: AMENDMENT OF SECTION 903.2.18: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.2.18 of the Fire Code is amended to read as follows:
903.2.18 Group U – Private Garages, Carports, Enclosed Patios and Storage Rooms. An automatic fire sprinkler system shall be installed in "U" occupancy whenever:
a. Any portion of said "U" occupancy is located beneath any portion of a building used for human occupancy.
b. The ceiling of said "U" occupancy is located fewer than seven (7) feet above the adjacent grade.
c. The "U" occupancy is located closer than 15' to an adjacent building on the same property used for human occupancy that is required to be equipped with fire sprinklers.
25.12.1225.12.13: ADDITION OF SECTION 903.3.1.3.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.3.1.3.1 is added to the Fire Code to read as follows:
903.3.1.3.1 NFPA 13D Fire Sprinkler System Design and Installation Specifications. The following additional features and/or devices shall be incorporated into the design and installation of fire sprinkler systems in R-3/U occupancies designed per NFPA 13D and the California Fire Code Amendments.
1. A listed water flow switch with a delay feature
2. A 6” exterior bell
3. Spare sprinklers, one of each type as installed in the systems must be placed in the spare head box. The spare head box must be attached to the interior of the building.
4. Special tools as required to remove any head in the system
5. A single check valve. The water district may require additional backflow preventors.
6. The design must include 5 gpm allowance for the domestic demand.
7. The design of a hydraulically calculated fire sprinkler system shall not exceed 90% of the available water supply capacity.
8. Attics used for storage and attics equipped with fuel-burning appliances must be equipped with a “pilot” sprinkler head above the equipment and/or storage.
PAGE 246 of 623
9. A water gauge above the check valve
10. An inspectors test valve
11. Sprinklers shall be installed in any closet that contains heating and/or air conditioning equipment, a washer, a dryer and/or a water heater regardless if the equipment is electric or gas fired.
12. An “in the bucket” acceptance test must be performed flowing water in the most hydraulically demanding areas for one minute into a factory graduated container with the capacity of the anticipated flow. The discharge must flow through the orifice of the heads as installed in the compartment. The test must be conducted by the installing contractor in the presence of the fire chief or his appointee during the rough or final inspections.
13. A 200 psi hydrostatic test must be performed for two hours during the rough piping inspection. The system must be pressurized at least one hour before the scheduled time of the inspection.
14. All NFPA 13D systems must be “Looped Passive Purge Sprinkler Systems” or a listed and acceptable Back-Flow Preventer device must be installed to protect the public water supply system.
13.15. All piping materials installed in NFPA 13D sprinkler systems must be certified as meeting NSF/ANSI Standard 61.
25.12.1325.12.14: AMENDMENT OF SECTION 903.4.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 903.4.1 of the Fire Code is amended to read as follows:
903.4.1 All automatic sprinkler systems including those protecting single-family dwellings shall have the flow switch electrically supervised by a listed central station. Alarm, supervisory and trouble signals shall be distinctly different.
Exception: R3 Dwellings and their Accessory buildings equipped with NFPA 13D Sprinkler systems and a Household Fire Alarms System are permitted to be monitored by Remote Supervising Station, unless otherwise required by the fire chief.
25.12.1425.12.15: ADDITION OF SECTION 906.1.1: Notwithstanding the provisions of Section 25.12.01 of this article, Section 906.1.1 is added to the Fire Code to read as follows:
906.1.1 Minimum Requirement. Portable fire extinguishers of a 2A10BC type shall be installed in all occupancies and locations as set forth in the fire code and as required by the fire chief.
Exceptions:
1. Other portable fire extinguishers may be installed, if approved by the fire chief or designee.
3. Group R, division 3 and group U occupancies are exempt.
25.12.1525.12.16: ADDITION OF SECTION 907.2.A Notwithstanding the provisions of Section 25.12.01 of this article, Section 907.2.A is added to the Fire Code to read as follows:
PAGE 247 of 623
907.2.A Household Fire Alarm Required. A monitored household fire alarm system is required in all new single-family residences and accessory dwelling units that are being required to be equipped with a sprinkler system.
This required household fire alarm system is in addition of the single station smoke and carbon monoxide alarms required by the California Residential Code. The household fire alarm system shall be designed and installed in accordance with the National Fire Protection Association Standard 72. The devices installed as components of the household fire alarm system shall be installed in the following prescriptive manner:
1. A minimum of one photoelectric smoke detector on each level of living space.
2. Photoelectric smoke detectors in the hallways outside all sleeping areas.
3. A rate of rise heat detector in each accessible attic, kitchen, wok room, basements and in all “U” occupancies that are located closer than 15' to an adjacent building on the same property used for human occupancy.
4. A combination fire/security panel is permitted in R-3 and/or U occupancies. The fire alarm plans must account for the current draw of all devices in the battery calculations.
5. The household fire alarm system shall be designed to provide a local and remote signal with the following specific information for each fire alarm detection device:
1. Room and floor location.
2. Type of signal.
3. Type of device.
4. Zone identification number.
6. A minimum of one horn to sound an interior distinct fire alarm. Additional horns may be required.
7. The owner of the premises is required to maintain and have the fire alarm system supervised for the perpetuity of the building regardless if occupied.
25.12.17: AMENDMENT OF SECTION 907.2.9.1: Notwithstanding the provision of section 25.12.01 of this article, section 907.2.9.1 is amended to read as follows:
907.2.9.1 Automatic Fire Alarm System. An automatic fire alarm system that activates the occupant notification circuit in accordance with section 907.5 shall be installed in all Group R-2 occupancies, the system shall be addressable with prescriptive initiation devices.
25.12.1625.12.18: DELETION OF SECTION 907.6.6, EXCEPTION 3: Notwithstanding the provisions of Section 25.12.01 of this article, Section 907.6.6, Exception 3, of the Fire Code is deleted.
25.12.1725.12.19: AMENDMENT OF SECTION 912.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 912.2 is amended to read as follows:
PAGE 248 of 623
912.2 Fire Department connections shall be located within 150 feet of a public fire hydrant; the Fire Department connection and the fire hydrant must be located on the same side of the street of a divided road, unless otherwise approved by the fire chief.
25.12.1825.12.20: AMENDMENT OF SECTION 3103.2: Notwithstanding the provisions of Section 25.12.01 of this article, Section 3103.2 of the Fire Code is amended to read as follows:
3103.2 Approval Required. Tents and membrane structures having an area in excess of 250 square feet, shall not be erected, operated or maintained for any purpose without first obtaining a permit and approval from the fire chief.
Exceptions:
1. Tents used exclusively for recreational camping purposes.
25.12.19: ADDITION OF SECTION 4907.4: Notwithstanding the provisions of Section
25.12.01 of this article, Section 4908 is added to the Fire Code to read as follows:
Section 4907.4 Clearance of Hazardous Vegetation from Structures and Roads within the City of San Marino.
4907.4.1 Statement of Legislative Intent and Purpose. It is the objective of this section to promote and protect the public health, safety and welfare by recognizing that there exists within the city of San Marino a potentially hazardous fire situation created by grass, weeds, shrubs, and trees which are in such condition and location as to provide a ready fuel supply to augment the spread or intensity of fire. It is the intent of this section to provide minimum standards to safeguard life, safety, property and the public welfare by insuring that hazardous vegetation or refuse is removed and that all grass, weeds, shrubs, and trees are properly maintained so as to not create a fire hazard within the community, while maintaining sufficient vegetation for aesthetic and soil erosion control purposes.
It is the further intent that this section apply on a year-round basis to insure the removal and/or proper maintenance of grass, weeds, shrubs, trees and refuse in order to prevent the spread or intensity of fire within the community. Of particular concern is the need to provide adequate defensible space in the urban/wildland interface area of the city, referred to as the high fire hazard severity zone. For purposes of this section, defensible space is that space within 100 feet (30.480 m) of a building or structure that is required for access by fire and other emergency personnel to defend the building or structure from the threat of fire. 4907.4.2 Prohibition. No person who has any ownership or possessory interest in, or control of a parcel of land shall allow to exist thereon any hazardous refuse or hazardous grass, weeds, shrubs, trees, or other vegetation, which, by reason of proximity to a building or structure, constitutes a fire hazard. For purposes of this section, hazardous grass, weeds, shrubs, trees, or other vegetation are defined as grass, weeds, shrubs, trees, or other vegetation which are in such condition and location, or by the unique characteristics of a species, as to provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3 Specific Requirements. In order to provide sufficient defensible space, each person who has any ownership or possessory interest in, or control of, a parcel of land shall:
PAGE 249 of 623
4907.4.3.1 General. Remove from the property all hazardous vegetation, except as otherwise provided herein, if such vegetation is within 100 feet (30.480 m) of a building, within ten (10) feet (3.048 m) of a combustible fence, or within ten (10) feet (3.048 m) of any portion of any highway, street, alley, or driveway improved or used for vehicular travel or other vehicular purposes. Distances up to 200 feet (60.960 m) or greater from a building or structure may be necessary as determined by the chief. This requirement does not apply to the maintenance of trees, ornamental shrubbery or plants which are used as ground cover, provided such are landscape materials that are properly irrigated and maintained and do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.2 Adjacent To Building. Keep all trees, shrubs, and other vegetation or portions thereof, adjacent to or overhanging any building or structure free of dead limbs, branches, and other combustible matter.
4907.4.3.3 Roof Clearance. Maintain 5 feet (1.524 m) of vertical clearance between roof surfaces and portions of trees or shrubs overhanging any building or structure. 4907.4.3.4 Chimney Clearance. Remove any portion of a tree or shrub which extends within 15 feet (4.572 m) of the outlet of a chimney or stovepipe. 4907.4.3.5 Roof Surface. Maintain the roofs of all buildings or structures free of leaves, needles, twigs, and other combustible matter.
4907.4.3.6 Building Clearance--30 Feet. Maintain all hazardous grass, weeds, and small shrubs within 30 feet (9.144 m) of any building or structure. Hazardous vegetation must be maintained less than 3 inches (76 mm) high; cut grass may be left on the slope to protect the soil if it lays down within 3 inches (76 mm) of the ground. Large native shrubs may be retained no closer than an average of 18 feet (5.486 m) apart, provided the lower branches have been trimmed a minimum of 3 feet (914 mm) above the ground, or at least thinned to reduce the available fuel volume.
4907.4.3.7 Roads. Maintain trees and shrubs within 10 feet of that portion of any highway, street, alley, or driveway which is improved or used for vehicle travel or other vehicular purposes (except for designated fire roads), so that no leafy foliage, twigs, or branches are within six (6) feet (1.828 m) of the ground (but no more than 1/3 of the crown). 4907.4.3.8 Combustible Fences. Maintain all hazardous grass, weeds and other vegetation located within 10 feet (3.048 m) of any combustible fence at a height of not more than 3 inches (76 mm). This shall not require the removal of trees, ornamental shrubbery or plants which are used as ground cover, provided such do not provide a ready fuel supply to augment the spread or intensity of a fire.
4907.4.3.9 Building Clearance--100 Feet. Maintain all hazardous grass, weeds, shrubs and trees within 100 feet (30.480 m) of any building or structure. Grass and small shrubs may be retained on steep slopes to stabilize the soil and prevent erosion, but may not exceed a height of 18 inches (457 mm). Large native specimen shrubs should be retained where possible, but no closer than an average of 18 feet (5.486 m) apart. Remove all dead foliage, twigs or branches, or live branches within 3 feet (914 mm) of the ground, from mature trees and shrubs (but no more than 1/3 of the crown).
PAGE 250 of 623
4907.4.3.10 Cut Vegetation and Refuse. Remove and/or safely dispose of all cut vegetation and hazardous refuse.
4907.4.3.11 Soil Erosion Control. If the abatement of hazardous vegetation results in the exposure of bare mineral soil, or the soil is exposed to such an extent that increased soil erosion would be likely, or the chief or his designee determines that the abatement has been excessive and poses a threat to the public health, safety or welfare, irrigation and landscaping or a suitable erosion control structure must be provided to establish effective soil erosion control. 4907.4.3.12 Minimum Requirements. Nothing contained in this section shall be deemed to preclude the chief from requiring more than the minimum specific requirements set forth above when the chief determines that conditions exist which necessitate greater fire protection measures. 4907.5 Notice. The council finds that grass, weeds, shrubs, trees, or other vegetation prohibited under sec. 4908.3 increase the danger of fire and thus constitute a public nuisance. If such condition exists, the San Marino Fire Department shall give notice to the owner of record to abate the nuisance within 30 days. The notice shall state that the owner is required to abate the nuisance and that if the nuisance is not abated the city may take further action which can include, (1) the city, or its contractor, may enter upon the parcel of land and remove or otherwise eliminate or abate the nuisance, (2) that upon completion of such work the cost thereof, including administrative costs, shall become a special assessment against that parcel, and (3) that upon council confirmation of the assessment and recordation of that order, a lien shall attach to the parcel to be collected on the next regular property tax bill levied against the parcel.”
25.12.2025.12.21: ADDITION OF SECTION 5608.2: Notwithstanding the provisions of Section
25.12.01 of this article, Section 5608.2 is added to the Fire Code to read as follows:
5608.2 The manufacturing, possession, storage, sale, use and handling of fireworks, other than "safe and sane" fireworks, is prohibited. The display, use or sale of fireworks described as "safe and sane" by the state fire marshal, is prohibited.
Exceptions:
1. Storage of fireworks is allowed in accordance with the requirements for low order explosives in title 19, California code of regulations, chapter 10.
2. Use and handling of fireworks for professional display by a state licensed pyrotechnician in accordance with title 19, California code of regulations, chapter 6, if permitted by the fire chief.
Section 13. New Article 13 Green Building Standards Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 13
GREEN BUILDING STANDARDS CODE
SECTION:
25.13.01: Green Building Standards Code Adopted
25.13.02: Addition Of Section 101.12
25.13.03: Amendment Of Section 202
PAGE 251 of 623
25.13.04: Amendment Of Section 301.1
25.13.05: Amendment Of Section 301.1.1
25.13.06: Amendment Of Section 5.408.3
25.13.07: Amendment Of Section 601.1
25.13.08: Violations
25.13.01: GREEN BUILDING STANDARDS CODE ADOPTED:
Except as hereinafter provided, the mandatory measures of the California Green Building Standards Code, 20252 Edition, as published by the California Building Standards Commission, are hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Green Building Standards Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023)
25.13.02: ADDITION OF SECTION 101.12:
Notwithstanding the provisions of section 25.13.01 of this article, section 101.12 is added to the Green Building Standards Code to read as follows.
101.12 Fee for Mandatory Measures. The fee for each plan check/permit shall be as periodically established by City Council resolution.
(Ord. 0-19-1357, 11-13-2019)
25.13.03: AMENDMENT OF SECTION 202:
Notwithstanding the provisions of section 25.13.01 of this article, section 202 of the Green Building Standards Code is amended by adding a definition to read as follows:
SUSTAINABILITY. Consideration of present development and construction impacts on the community, the economy, and the environment without compromising the needs of the future. (Ord. 0-19-1357, 11-13-2019)
25.13.04: AMENDMENT OF SECTION 301.1:
Notwithstanding the provisions of section 25.13.01 of this article, section 301.1 of the Green Building Standards Code is amended to read as follows:
301.1 Scope. Buildings shall be designed to include the green building measures specified as mandatory this code. Voluntary green building measures are also included in this code the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless they are adopted by a city or county as specified in Section 101.7.
(Ord. 0-19-1357, 11-13-2019)
25.13.05: AMENDMENT OF SECTION 301.1.1:
PAGE 252 of 623
Notwithstanding the provisions of section 25.13.01 of this article, section 301.1.1 of the Green Building Standards Code is amended to read as follows:
Section 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings. Code sections relevant to additions and alterations shall only apply to the portions of the building being added or altered within the scope of the permitted work.
(Ord. 0-19-1357, 11-13-2019)
25.13.06: AMENDMENT OF SECTION 5.408.3:
Notwithstanding the provisions of section 25.13.01 of this article, section 5.408.3 of the Green Building Standards Code is amended to read as follows:
5.408.3 Excavated soil and land clearing debris [BSC] 100 percent of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled.
For a phased project, such material may be stockpiled on site until the storage site is developed.
Exception: Reuse, either on-or off-site, of vegetation or soil contaminated by disease or pest infestation.
Notes:
1. If contamination by disease or pest infestation is suspected, contact the County Agricultural Commissioner and follow its direction for recycling or disposal of the material. (www.cdfa.ca.gov/exec/county/ county_contacts.html)
2. For a map of known pest and/or disease quarantine zones, consult with the California Department of Food and Agriculture. (www.cdfa.ca.gov)
3. Contaminated soil shall not be reused and shall be disposed of or remediated in accordance with relevant regulations.
(Ord. 0-19-1357, 11-13-2019)
25.13.07: AMENDMENT OF SECTION 601.1:
Notwithstanding the provisions of section 25.12.01 of this article, section 601.1 is added to the Green Building Standards Code to read as follows:
601.1. This section lists the organization and standards that are referenced in various sections of this document. The standards are listed herein by the promulgating agency of the standard. (Ord. 0-19-1357, 11-13-2019)
25.13.08: VIOLATIONS:
Any person, firm or corporation violating any of the provisions or failing to comply with any of the mandatory requirements of this article shall be guilty of a misdemeanor and upon conviction thereof shall be punishable as provided in section 01.04.03 A of this code. Each such person shall be guilty of a separate offense for each and every day during any portion of which any violation PAGE 253 of 623
of any provision of this article is committed, continued or permitted by any such person, and he/she shall be punishable as herein provided.
(Ord. 0-19-1357, 11-13-2019)
Section 14. New Article 14 Reference Standards Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 14
REFERENCED STANDARDS CODE
SECTION:
25.14.01: Referenced Standards Code Adopted
25.14.01: REFERENCED STANDARDS CODE ADOPTED:
Except as hereinafter provided, the California Referenced Standards Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Referenced Standards Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 15. New Article 15 Small Residential Rooftop Solar Energy Systems is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 15
SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS
SECTION:
25.15.01: Expedited Permitting Of Small Residential Rooftop Solar Energy Systems
25.15.01: EXPEDITED PERMITTING OF SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS:
A. Small Residential Rooftop Solar Energy System Defined: "Small residential rooftop solar energy system" shall have the same meaning as provided in the solar rights act, Government Code section 65850.5(j)(3), as the same may be amended from time to time.
B. Small Residential Rooftop Solar Energy System Standard Plan And Permit Application Checklist:
1. The city shall adopt standard plans and a checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. The small residential rooftop solar energy system standard plans and checklist shall substantially conform to recommendations for expedited permitting, including the checklist and standard plans, contained in the most current version of the "California Solar Permitting Guidebook" adopted by the governor's office of planning and research.
PAGE 254 of 623
2. All documents required for the submission of a small residential rooftop solar energy system permit application, the standard plan(s), and checklist shall be made available on the publicly accessible city website.
3. Electronic submittal of the required permit application and documents by e-mail or facsimile shall be available to all small residential rooftop solar energy system permit applicants.
An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature. Electronic permit applications shall be submitted through the method of electronic submittal specified by the building official.
C. Permit Application Review:
1. An application that satisfies the information requirements in the checklist(s) and standard plans shall be deemed complete.
2. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission.
3. The building official shall issue a building permit the same day for over the counter applications, or within one to three (3) business days for electronic applications, upon receipt of a complete application that meets the requirements of the city's standard checklist and plan(s), or as soon thereafter as may be practicable. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements.
4. Any condition imposed on a permit shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
D. Inspection Requirements:
1. Inspection requests may be submitted by e-mail or facsimile.
2. Only one inspection shall be required for small residential rooftop solar energy systems eligible for expedited review.
3. The inspection shall be done in a timely manner. The building official shall strive to schedule an inspection within two (2) business days of a request and provide a two (2) hour inspection window.
4. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this section. (Ord. 0-15-1298, 9-9-2015) Section 16. New Article 16 Appendix J Los Angeles County Grading Standards is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 16
APPENDIX J LOS ANGELES COUNTY GRADING STANDARDS
SECTION:
25.16.01: Appendix J Los Angeles County Grading Standards Code Adopted PAGE 255 of 623
25.16.01: APPENDIX J LOS ANGELES COUNTY GRADING STANDARDS CODE ADOPTED:
Except as hereinafter provided, the Los Angeles County Appendix J Standards Code, 2019 2022 Edition, as published by the Los Angeles County Department of Public Works, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Los Angeles County Appendix J Grading Standards Code of the City. A copy of said Code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public. (Ord. 0-19-1357, 11-13-2019)
Section 17. New Article 17 Existing Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 17
EXISTING BUILDING CODE
SECTION:
25.17.01 Existing Building Code Adopted
25.17.01: EXISTING BUILDING CODE ADOPTED:
Except as hereinafter provided, the California Existing Building Code, 20252 edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the historic building code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) Section 18. New Article 18 Historical Building Code is hereby added to Chapter 25 of the San Marino City Code to read as follows:
ARTICLE 18
HISTORICAL BUILDING CODE
SECTION:
25.18.01 Historical Building Code Adopted
25.18.01: HISTORICAL BUILDING CODE ADOPTED:
Except as hereinafter provided, the California Historical Building Code, 20252 Edition, as published by the California Building Standards Commission, is hereby adopted by reference and incorporated herein as though fully set forth herein and shall constitute the Historical Building Code of the City. A copy of said code shall be located in the Planning and Building Department and shall be, at all times, maintained by the Planning and Building Department for use and examination by the public.
PAGE 256 of 623
(Ord. 0-19-1357, 11-13-2019; amd. Ord. O-22-1400, 1-11-2023) SECTION 18. PUBLICATION
The Mayor shall sign and the City Clerk shall attest to the adoption of this Ordinance and shall cause the same to be published as required by law.
SECTION 19. EFFECTIVE DATE
This ordinance shall take effect immediately upon adoption by a 4/5 vote of the City Council.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the City Council of the City of San Marino held on September 26, 2025.
____________________________________
GRETCHEN SHEPHERD ROMEY
MAYOR
ATTEST:
_________________________
ALISON WALKER
CITY CLERK
APPROVED AS TO FORM:
_________________________
JOSEPH MONTES
CITY ATTORNEY
PAGE 257 of 623
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF SAN MARINO )
I HEREBY CERTIFY that the foregoing Ordinance No. O-25-1423-U, was introduced at an Adjourned Regular Meeting of the City Council held on the 26th day of September, 2025, and was approved and adopted at an Adjourned Regular Meeting of the City Council held on the 26th day of September, 2025, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________________
ALISON WALKER
CITY CLERK
PAGE 258 of 623
TO: Mayor and City Council
FROM: Philippe Eskandar, City Manager
BY: Amber Shah, Parks & Public Works Director
DATE: September 26, 2025
SUBJECT: AWARD OF A CONSTRUCTION AGREEMENT TO G2
CONSTRUCTION, INC. FOR THE PURCHASE AND
INSTALLATION OF CATCH BASIN TRASH AND DEBRIS
CAPTURE DEVICES IN THE AMOUNT OF $150,000
STRATEGIC PLAN CRITICAL SUCCESS FACTORS
Fiscally Responsible and Transparent City Government
Safe Community
Well-Maintained Infrastructure
BACKGROUND
The State Water Resources Control Board (SWRCB) works in coordination with nine (9) Regional Water Boards to implement the Federal Water Pollution Control Act (Clean Water Act) to preserve, protect, enhance and restore water quality throughout California. Pursuant to the Clean Water Act, the State’s Municipal Storm Water Program regulates storm water discharges from municipal separate storm water systems (MS4s) through the issuance of MS4 Permits. The Los Angeles Regional Water Quality Control Board Order No. R4- 2012-0175, as amended by State Water Board Order WQ 2015-0075, regulates discharges of storm water and non-storm water from the MS4s operated by the Los Angeles County Flood Control District, Los Angeles County and 84 municipal permittees (including the City of San Marino) in a drainage area that encompasses more than 3,000 square miles and multiple watersheds. The Los Angeles County MS4 Permit requires Permittees to reduce the level of pollutants, including trash, debris and sediment, from entering the area’s water bodies from the storm sewer systems owned or operated by the Permittees.
Gretchen Shepherd Romey, Mayor
Tony Chou, Vice Mayor
Hunter Chang, Council Member
John Chou, Council Member
Calvin Lo, Council Member
PAGE 259 of 623
In 2015, the SWRCB adopted Resolution 2015-0019 (Resolution) amending the Water Quality Control Plan for Ocean Waters of California (California Ocean Plan) to control trash impacts to the surface waters of California. This Resolution finds that trash in California’s surface water is a pervasive problem and adversely affects numerous beneficial uses including, but not limited to, wildlife habitat, marine habitat and human water contact and non-contact recreation. Studies have shown that trash is predominantly generated on land and then transported to surface waters through the storm drain system. This Resolution also establishes a statewide narrative water quality objective and implementation requirements to control trash. The SWRCB directed each of the nine (9) Regional Water Quality Control Boards to incorporate trash provision requirements into their MS4 Permit. The City is subject to this mandate which requires the installation of trash capture devices that capture litter and trash down to 5mm in size, to prevent this debris from reaching receiving waters such as rivers, creeks and the Pacific Ocean.
In 2018, Los Angeles County voters approved Measure W, that created the Safe Clean Water Program (SCWP) and allowed for the collection of a special parcel tax of 2.5 cent ($0.025) per square foot of impermeable area on private property in the LA County Flood Control District. Through Measure W, the SCWP provides local, dedicated funding to increase regional water supply, improve water quality, and enhance communities throughout Los Angeles County with forty percent (40%) of the funding from the SCWP allocated to cities as local return. On average, the City has received approximately $235,000 per year the past four (4) years to address local stormwater and urban runoff challenges and opportunities.
On May 30, 2025, the City Council adopted the Fiscal Year 2025-26 Operating and Capital Improvement Program (CIP) budgets. As part of CIP budget, the City Council approved an appropriation of $150,000 for the procurement and installation of trash and debris capture devices in catch basins utilizing Measure W Safe Clean Water Program funds. The installation of these devices will help prevent trash, debris and other objects from entering the storm drain system and polluting the stormwater, helping ensure compliance with State and Regional Water Board regulations.
DISCUSSION
The procurement and installation of trash and debris capture devices is a continuation of a City program that began in 2020, during which ARS-CLTM curb-opening screens were installed in seventy-two (72) City-owned catch basins by G2 Construction, Inc. The program continued in FY 2023-2024 and FY 2024-2025 with sixty-nine (69) new devices installed in City-owned catch basins. This program is part of an ongoing effort to comply with MS4 Permit PAGE 260 of 623
requirements to keep trash, debris and sediment from entering the storm drain system. The City has been executing the retrofit of catch basins in phases to spread construction costs over multiple years. This year, G2 Construction, Inc. provided a proposal for the fabrication and installation of forty-nine (49) new full capture systems in City-owned catch basins.
Additionally, G2 will also fabricate and install curb-opening devices in fifteen (15) catch basins that currently do not have a curb screen. This year’s project will complete the retrofit of City-owned catch basins (excluding any that were determined unable to be retrofit) and will also include the field review and measurement of one hundred thirty-four (134) County-owned catch basins located within the City’s jurisdiction that are the responsibility of the City to retrofit as they capture stormwater runoff from the City. This information will be used in the preparation of County permits for eligible catch basins to be retrofitted in future year(s) projects. The total cost for this work is $150,000.
Trash and debris capture devices are unique products that must be customized and fabricated for each catch basin in order for the device to function properly.
G2’s proprietary ARS-CLTM curb-opening screens and CPS-ModTM Full Capture Screens are unique patented storm water treatment devices made from 304 stainless steel that are designed and custom fabricated by G2 to the specific dimensions of each specific catch basin or inlet. This enables these devices to last much longer than the 10 (10)year warranty period.
The ARS-CLTM curb-opening screens effectively stop all trash and debris that is ¾” or greater from entering the catch basins during dry weather. These screens capture 85% to 90% of debris that typically flows into the catch basins, clog the 5mm holes of the CPS-ModTM screens, and impair their treatment capacity. The City’s street sweeping program then collects these pollutants. The CPS-ModTM Full Capture System is effective as the final lineof-defense when trash and debris escape past the ARS-CLTM screens during heavy storm events. The CPS-ModTM patented design stops 100% of particles 5mm or larger from exiting the catch basin and flowing downstream. This device is also certified by the State Water Board as a Full-Capture System.
Staff has evaluated G2’s Proposal and determined that the products produced by G2 (specifically, the CPS-MOD™ & ARS-CL™ Screens) are uniquely suited, proprietary products that will both fit within the City’s existing infrastructure and match existing facilities for the purposes of maintenance efficiency. The CPS-MOD™ & ARS-CL™ Screens are compatible with, and are an integral component of, the City’s existing infrastructure, and the continued use of the screens would facilitate the continuity of maintenance and support of its trash and debris capture devices.
The City’s Municipal Code Section 2.06.05.B.6 allows the City to make the PAGE 261 of 623
procurement and installation of trash and debris capture devices is a continuation of a City program that began in 2020, during which ARS-CLTM curb-opening screens were installed in seventy-two (72) City-owned catch basins by G2 Construction, Inc. The program continued in FY 2023-2024 and FY 2024-2025 with sixty-nine (69) new devices installed in City-owned catch basins. This program is part of an ongoing effort to comply with MS4 Permit requirements to keep trash, debris and sediment from entering the storm drain system. The City has been executing the retrofit of catch basins in phases to spread construction costs over multiple years. This year, G2 Construction, Inc. provided a proposal for the fabrication and installation of forty-nine (49) new full capture systems in City-owned catch basins.
Additionally, G2 will also fabricate and install curb-opening devices in fifteen (15) catch basins that currently do not have a curb screen. This year’s project will complete the retrofit of City-owned catch basins (excluding any that were determined unable to be retrofit) and will also include the field review and measurement of one hundred thirty-four (134) County-owned catch basins located within the City’s jurisdiction that are the responsibility of the City to retrofit as they capture stormwater runoff from the City. This information will be used in the preparation of County permits for eligible catch basins to be retrofitted in future year(s) projects. The total cost for this work is $150,000.
Trash and debris capture devices are unique products that must be customized and fabricated for each catch basin in order for the device to function properly.
G2’s proprietary ARS-CLTM curb-opening screens and CPS-ModTM Full Capture Screens are unique patented storm water treatment devices made from 304 stainless steel that are designed and custom fabricated by G2 to the specific dimensions of each specific catch basin or inlet. This enables these devices to last much longer than the ten (10)-year warranty period.
The ARS-CLTM curb-opening screens effectively stop all trash and debris that is ¾” or greater from entering the catch basins during dry weather. These screens capture 85% to 90% of debris that typically flows into the catch basins, clog the 5mm holes of the CPS-ModTM screens, and impair their treatment capacity. The City’s street sweeping program then collects these pollutants. The CPS-ModTM Full Capture System is effective as the final lineof-defense when trash and debris escape past the ARS-CLTM screens during heavy storm events. The CPS-ModTM patented design stops 100% of particles 5mm or larger from exiting the catch basin and flowing downstream. This device is also certified by the State Water Board as a Full-Capture System.
Staff has evaluated G2’s Proposal and determined that the products produced by G2 (specifically, the CPS-MOD™ & ARS-CL™ Screens) are uniquely suited, proprietary products that will both fit within the City’s existing infrastructure and match existing facilities for the purposes of maintenance efficiency. The PAGE 262 of 623
CPS-MOD™ & ARS-CL™ Screens are compatible with, and are an integral component of, the City’s existing infrastructure, and the continued use of the screens would facilitate the continuity of maintenance and support of its trash and debris capture devices.
The City’s Municipal Code Section 2.06.05.B.6 allows the City to make purchases from bids received by the County, State, or other public agency.
This process is sometimes known as “piggy-backing”, and allows the City to utilize the formal bidding results of other agencies when purchasing specialized equipment. G2 has been awarded a master agreement with the County of Orange (Contract No. MA-080-25011708) to furnish and install Trash and Debris Capture Devices on County-owned property (“County Agreement”). Section 16 of the Additional Terms and Conditions of the County Agreement establishes a Cooperative Contract that permits non-County public agencies to execute subordinate contracts for the same services during the effective dates of the County Agreement, which is currently through August 8, 2030. Under the County Agreement, the RCA terms, conditions, and pricing shall be extended to all subordinate contracts issued. The City’s agreement with G2, if awarded, is intended to be consistent with the terms, conditions, and pricing available through the County Agreement.
FISCAL IMPACT & PROCUREMENT REVIEW
The City’s adopted FY 2025-26 adopted budget includes an appropriation of $150,000 in Account #246-46-4600-8026 for the Trash Capture Filter Program. The quote from G2 Construction, Inc. for the purchase and installation of trash and debris capture devices utilizing pricing from the County of Orange’s Master Agreement is $150,000. This purchase will be made solely utilizing Measure W Safe Clean Water Program funds, with no impact to the City’s General Fund.
The purchase and installation of the trash and debris capture devices is in compliance with the City’s procurement policy, as the Department will be using a cooperative purchasing agreement in accordance with SMCC 02.06.05.B.6.
The Finance Director has reviewed this staff report for compliance with San Marino City Code §02.06.05.
LEGAL REVIEW
The City Attorney's office has reviewed and approved as to form.
PAGE 263 of 623
RECOMMENDATION
Staff recommends the City Council approve the procurement and installation of trash and debris capture devices from G2 Construction, Inc. in the amount of $150,000. If the City Council concurs with staff’s recommendation, an appropriate motion would be:
“I move to approve the Construction Agreement for the procurement and installation of trash and debris capture devices from G2 Construction, Inc. in the amount of $150,000.”
ATTACHMENTS
1. Proposal from G2 Construction
2. Draft Maintenance Service Agreement with G2 Construction
3. Map of Proposed & Existing Catch Basin Devices
4. Orange County Public Works Master Agreement
5. Trash Capture Filters Program CIP Form
PAGE 264 of 623
Proposal For
CITY of SAN MARINO
2025 CPS-Mod™ Full-Capture Systems
& ARS-CL™ Curb-Opening Screens
in City-Owned Catch Basins
Sept. 15, 2025
Prepared For:
Amber Shah, P.E.
Parks & Public Works Director / City Engineer
City of San Marino
2200 Huntington Drive
San Marino, CA 91108
626.300.0787
Prepared By:
Eric H. Taylor
G2 Construction, Inc.
714.679.2550
[email protected]
PAGE 265 of 623
G2 Construction Proposal CITY OF SAN MARINO
Lic. #801253 - A, C8, C60
1352 E. Borchard Ave.
Santa Ana, CA 92705
714.748.4242
Customer: City of San Marino Prepared: 9/15/2025
Public Works Department Proposal #: 250915-SM
2200 Huntington Drive
San Marino, CA 91108
Eric H. Taylor
Contact: Amber Shah, P.E. By: Eric H. Taylor
Public Works Director / City Engineer G2 Construction, Inc. 626.300.0787 714.679.2550
<[email protected]> [email protected]
continued
The project's pricing will match and piggyback on G2's existing Master Purchase Agreement with Orange County Public Works MA-080-25011708. G2 will provide the following services for this project:
For County-owned CBs G2 will locate and field review and research 134 LACDPW-owned CBs, research the County's database, and generate the "Exhibit A" spreadsheet required to apply for a Flood Control Permit application. G2 will provide expertise and assist with the City's application, and this will allow for installations in 2026-27.
PROPOSAL for CITY of SAN MARINO
Catch Basin Trash Device Project 2025
DESCRIPTION
For City-owned CBs G2 will collect the required field data, then fabricate and install 49 G2 CPSMod™ certified Full Capture Systems . G2 will also fabricate and install G2 ARS-CL™ curbopening devices in 15 CBs that do not currently have a curb screen.
G2 Construction (G2) proposes the fabrication and installation of G2's patented catch basin trash devices in San Marino City-Owned catch basins (CBs). G2 also proposes to field review and collect measurements and data for LACDPW-owned CBs necessary to apply for an LA County Flood Control Permit to allow future device installations.
Installation work to be performed at Prevailing Wage rates and certified payroll submitted to DIR.
G2 will perform all work except for catch basin cleaning. Sub-Contractor Ron's Maintenance (RMI) will clean the CBs prior to CPS-Mod installation. 1 of 2
2 PAGE 266 of 623
G2 Construction Proposal CITY OF SAN MARINO
continued
CITY Catch Basin Device Installations
Item Description Qty Price Unit Sub-Total
1. 56 $92 /CB $5,152
2. 2.1 CPS-Mod - 4.6-6.0 sqft filtration 38 $1,476 /CPS-Mod $56,088
2.2 CPS-Mod - 6.1 to 9.0 sqft filtration 5 $1,753 /CPS-Mod $8,765
2.3 CPS-Mod - 9.1-11.0 sqft filtration 6 $1,975 /CPS-Mod $11,850 Totals Full Capture System Devices: 49
CPS-Mod Special Conditions
2.4 Heavy Duty CPS-Mod add 10 $482 /device $4,820
2.5 Custom CPS-Mod add 8 $672 /device $5,376
2.6 Removal of Existing Devices 1 $550 /CB $550
3. 3.1 ARS-CL-05 5' (1) 7 $1,535 /CB $10,745
3.2 ARS-CL-07 7' (2) 4 $2,641 /CB $10,564
3.3 ARS-CL-10 10' (2) 2 $2,900 /CB $5,800
3.4 ARS-CL-14x 14 (3) 1 $3,766 /CB $3,766
3.5 ARS-CL-14x 14' (4) 1 $4,647 /CB $4,647
Totals ARS-CL Catch Basins: 15
4 Catch Basin Cleaning prior to installs. 49 $50 /CB $2,450 CB cleaning performed by sub-contractor RMI.
5 Traffic Control during installation (days) 1 $3,155 /Day $3,155 6 Photos of installed devices. 1 Free
7 Provide project management for installation. 1 Free
COUNTY Catch Basins
8.1 134 $92 /CB $12,328
8.2 134 $92 /CB Free
8.3 50 $120 /HR Free
9 Project Bonds 1 $3,944
Project Total: $150,000
Field Review & Measurements (Locating CBs &
Recording Data). Enter and format data for Application.
Field Review & Measurements (Locating CBs &
Recording Data). Enter and format data for Application.
LA County Flood Control Permit "Exhibit A" Preparation
(Collecting Lat/Long, Storm Lines, Data & formatting) & Submittal to LACFC. Priced @ 50% of MA pricing.
Project Management to assist the City with submitting and obtaining the County's Flood Control Permit.
Fabricate and install 49 CPS-Mod™ FULL
CAPTURE SYSTEMS and perform technical install
(prevailing wage). Devices made of 304 stainless
steel with 5mm perforations.
Fabricate ARS-CL™ curb-opening screens and
install 15 catch basins. There will be
approximately 26 unique ARS-CL™ screens. Devices
made of 304 stainless steel with 3/4" filtration holes. 2 of 2
3 PAGE 267 of 623
County of Orange
OC Public Works
MA-080-25011708
Trash and Debris Capture Devices