Cities Index.
Agenda packet

San Ramon City Council
March 25, 2025

Document
Agenda packet
Meeting
March 25, 2025
Body
San Ramon City Council
Pages
50
Original file
4.2 MB
Text extracted from the city's file for reading and search. Open the original on sanramonca.iqm2.com. That file is the official record.

9.2.a
Packet Pg. 134 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
New Construction
1 DU
4 Deposit1,2,3 $1,500
2-10 DU
4 ’s Deposit1,2,3 $2,000
Up to 10 DU
4 's Deposit1,2,3 $2,500
More than 10 DU
4 's Deposit1,2,3 $3,500
Single-Family 2nd Story Addition Each $1,654
New Construction-Small (up to 10,000 sf.) Deposit1,2,3 $2,000 New Construction-Large (greater than 10,000 sf.) Deposit1,2,3 $3,500 Alterations Deposit1,2,3 $2,000
Administrative Review – ARB Review (All Districts) Deposit1,2,3 $1,000 Development Plan
Preliminary Housing Application Fee Each $1,654
Development Plan:

Conceptual Development Plan Review – ARB Review Each $3,970 Conceptual Development Plan Review – PC Review Each $3,970 Development Plan (Residential) Deposit1,2,3 $5,500
Development Plan (Non-Residential) Deposit1,2,3 $5,500
Development Plan Amendment (Changes to Site Plan and/or Sq Ft) Administrative Review Each $3,308
Mitigation Monitoring Administration
Mitigation Monitoring Staff Time Deposit1,2,3 $3,000
Mitigation Monitoring Program Implementation / Special Peer / Consultant Review Deposit1,2,3 $4,000 Contra Costa County Clerk Filing Fee (Fee payable to County Clerk) Each 5 Set by State
Department of Fish & Game User Fee – Negative Declaration Each 5 Set by State
Environmental Impact Report Each
5 Set by State
Certified Regulatory Program Each
5 Set by State
Rezoning
Rezoning (All Districts) Deposit1,2,3 $8,000
Sign Review
Sign Permit (Each face copy charge) /Administrative Sign Review Each $414 Sign Permit (Each new sign requiring ARB Review) Each $3,970 Master Sign Program Approved Signs Each $414
New Master Sign Program Deposit1,2,3 $4,500
Office / Commercial / Industrial − New Construction, Additions, Alterations Page
3 of 41

9.2.a
Packet Pg. 135 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Master Sign Program Amendment Deposit1,2,3 $4,500
Temporary Sign Permit (Ninety [90] Consecutive Days) Each $414 Temporary Banner / Special Event Sign (Twenty-one [21] Consecutive Days, Maximum one [1] per Quarter)
Each $414
Special Reviews
Document / File Research Deposit1,2,3 $500
Special Peer / Consultant Review Deposit1,2,3 $3,000
Specific Plan
Specific Plan (Consultant Prepared) Deposit1,2,3 $12,500 Subdivisions
Major Subdivision Deposit1,2,3 $6,500
Minor Subdivision Deposit1,2,3 $5,000
Urban Lot Split Each $5,459
Text Amendment
General Plan Text Amendment Deposit1,2,3 $12,500
Specific Plan Text Amendment Deposit1,2,3 $12,500
Zoning Text Amendment Deposit1,2,3 $10,000
Time Extensions
Time Extension Approved Administratively (Architectural Review, Development Plan, Use Permit Major / Minor Subdivisions, Variance, etc.) Each $331
Time Extension Requiring Public Hearing(s) (Development Plan, Use Permit, Major / Minor Subdivisions, Variance, etc.) Deposit1,2,3 $2,000 Use Permits
Minor Land Use Permit and Amendments (All Districts) Deposit1,2,3 $4,000 Major Land Use Permits Requiring Public Hearing(s) & Amendment to Land Use Permit and/or Conditions of Approval (All Districts) Deposit1,2,3 $7,500 Temporary Land Use Permit (Special Events e.g. Christmas Tree and Halloween Lots, etc.)
Each $827
Temporary Land Use Permit − Portable Outdoor Storage Unit (POSU) Residential Each $331
Non-Residential Each $331
Other Fees
Zoning Clearance Each $827
Home Occupation Permit Each $248
Short-Term Rental Registration
Page
4 of 41

9.2.a
Packet Pg. 136 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
New Each $413
Renewal Each $331
Telecommunications Use Permit
Right-of-way Use Permit Deposit1,2,3 $3,500
Requiring Administrative Review Deposit1,2,3 $4,000
Requiring ARB Review Deposit1,2,3 $6,500
Requiring Planning Commission Review Deposit1,2,3 $6,500 Small Wireless Site License Fee Each $993
Variances
Single Family Residence Each $2,647
Variance Requiring Public Hearing (Each Application) Deposit $5,500 Variance – Processed Administratively Each $2,647
Minor Exception Each $2,316
Appeals
Appeal from Zoning Administrator's Decision for Residential Property under SRMC §D7-8 Deposit1,2,3 $4,000
Appeal from Zoning Administrator's Decision for Non- Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500
Appeal from Planning Commission Decision for Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500
Appeal from Planning Commission Decision for Non- Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500
Development Agreement & Amendments
Development Agreement & Amendments Deposit1,2,3 $6,000
Development Agreement Annual Review Each $662
Improvement Bonds & Deposits
Bond Amount Bond 100% of Improvement or 20% Cash Bond
Improvement Bond Processing Deposit1,2,3 $2,000
Zoning Review/Building Permit
Single Family – Remodel Each $495
Single Family - New/Addition/Substantial Alteration- Each $992 Multi-Family/Mixed-Use - Minor Improvement Each $827
Multi-Family/Mixed-Use - New/Addition/Substantial Alteration Each $1,654 Commercial/Industrial - New Build Each $1,654
Commercial/Industrial - T.I. Each $331

Page 5 of 41 ends

9.2.a
Packet Pg. 137 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Additional Plan Check fee (each review) Each $331
Address / Street Assignments
Single Address Each $496
Multiple Addresses Deposit1,2,3 $1,500
Tree Removal Permit
Single-Family Residential Per Application $496
Subdivision Per Application $1,323
Non-Residential, Adminitrative Per Application $496
Non-Residential- Requiring Additional ARB Meeting*** Each $1,654 Miscellaneous Fees
Zoning Certification letter Deposit1,2,3 $500
Newspaper Advertisement Actual Cost Actual Cost
Notices
Mailing (Under 100 Notices) Each $827
Mailing (Over 100 Notices) Each $1,323
Postage Per Address Current Postage Rate
Microfilm and/or Laserfiche Fee
Administrative Application(s) (Each Application) Each $165 Application(s) Requiring Public Hearing (Excluding Major Subdivisions) Each $331 Residential Subdivisions (Major Subdivision) Each $993
Technology Fee Surcharge
Technology Fee Surcharge % of Permit or Application Fee 4.60%

DEVELOPMENT IMPACT FEES
School Age Child Care Fees6
Commercial
Office Per Gross SF $0.61
Retail Per Gross SF $0.34
Hotel Per Gross SF $0.18
Industrial Per Gross SF $0.23
Residential
Single-Family Per Unit $1,163.36
Multi-Family Per Unit $626.84
Park and Recreation Facility Impact Fee6
Subdivision Projects
Single-Family Per Unit $5,300.00

Page 6 of 41 ends

9.2.a
Packet Pg. 138 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Multi-Family Per Unit $3,421.63
Non-Subdivision Projects
Single-Family Per Unit $23,951.43
Multi-Family Per Unit $14,370.86
Parkland Dedication Fee (Quimby Act)
Single-Family Per Unit Appraised Value of 687 s.f. of Land x 1.02 Multi-Family Per Unit Appraised Value of 451 s.f. of Land x 1.02 Open Space Development Impact Fee6
Single-Family Per Unit $1,141
Multi-Family Per Unit $750
Private Sector Art & Beautification Contribution Fee
New Residential & Commercial Development % of Building Valuation 0.01% Additions / Alterations to Existing Residential & Commercial Dev. % of Building Valuation 0.005% Affordable Housing Impact Fee7
Commercial
Office, Retail, Hotel Per Gross SF $4.85
Industrial Per Gross SF $3.64
Residential
Single-Family or Multi-Family Under 10 Units Per Liveable SF $15.16 Single-Family Detached, 10+ Units On-Site Construction of Units $16.27 Multi-Family, 10+ Units On-Site Construction of Units On-Site Construction of Units Westside Specific Plan Recovery
Non-Residential Per Gross SF $0.56
Residential Per Unit $713.49
Long-Range Planning Recovery Fees
General Plan Recovery Costs % of Building Valuation 0.55% Zoning Ordinance Recovery Costs % of Building Valuation 0.17% San Ramon Village Specific Plan Recovery Fee
Commercial Per Gross SF $0.44
Residential Per Unit $598.11
Planning Services Division Footnotes:

2. Deposit amounts are set at assumed average cost of time and materials to provide the service. When the deposit has been drawn by 80%, an additional deposit of 25% to 50% of the original deposit fee will be required to continue processing application(s) as determined by the Planning Services Division. Applications may be deemed withdrawn if account deficits exist.

1. Time and Materials charges are calculated using an hourly rate of $330.00 for each employee working on the application.

Page 7 of 41 ends

9.2.a
Packet Pg. 139 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Building Permit Fees (Valuation-Based)
$1.00 to $500.00 Base $207
Projects Valued at $500 Base $207
$501.00 to $2,000.00 Each Addl. $100 or fraction thereof $14 Projects Valued at $2,000 Base $417
$2,001.00 to $25,000.00 Each Addl. $1,000 or fraction thereof $18 Projects Valued at $25,000 Base $831
$25,001.00 to $50,000.00 Each Addl. $1,000 or fraction thereof $33 Projects Valued at $50,000 Base $1,656
$50,001.00 to $100,000.00 Each Addl. $1,000 or fraction thereof $13 Projects Valued at $100,000 Base $2,306
$100,001.00 to $500,000.00 Each Addl. $1,000 or fraction thereof $11 Projects Valued at $500,000 Base $6,706
$500,001.00 to $1,000,000.00 Each Addl. $1,000 or fraction thereof $9 Projects Valued at $1,000,000 Base $11,206
$1,000,001.00 to $10,000,000 Each Addl. $1,000 or fraction thereof $4 Projects Valued at $10,000,000 Base $42,706
$10,000,001.00 to $50,000,000 Each Addl. $1,000 or fraction thereof $3 Projects Valued at $50,000,000 Base $162,706
$50,000,001 to $100,000,000 Each Addl. $1,000 or fraction thereof $3 Projects Valued at $100,000,000 Base $312,706
$100,000,000+ Each Addl. $1,000 or fraction thereof $3
Permit Valuation shall be set as required in Section 109.3 of the California Buildign Code as adopted and amended by the City of San Ramon.

Building Plan Check Fees
Plan Check Fee % of Building Permit 55%
Disabled Access Plan Check % of Plan Check Fee 25%
Energy Plan Check % of Plan Check Fee 25%
Additional Fees

BUILDING & SAFETY FEES

3. Project Applicants shall pay a cumulative total fee and/or deposits for each application type required.

4. DU = Dwelling Unit

5. The State Department of Fish & Game and Contra Costa County require filing fees (AB 3158) at the time of project approval.

6. School Age Child Care Fees, Park and Recreational Facility Impact Fee, and Open Space Impact Fee will be adjusted annually using the Engineering News Record - San Francisco Bay Area Construction Cost Index, not to exceed the cap in the Keyser Marston Associates Development Fee Study, March 2017.

7. Refer to the Inclusionary Housing and Affordable Housing Commercial Linkage Fee Ordinance for on-site construction requirements. The review authority may also consider an applicable alternative means of compliance or waiver/adjustment/reduction claims as allowed by the Ordinance.

Page 8 of 41 ends

9.2.a
Packet Pg. 140 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Permit Issuance Fee Per Permit $87
Disable Access Inspection % of Building Permit Fee 25%
Energy Inspection % of Building Permit Fee 25%
Plan Duplication Affidavit Fee Per Plan $87
Technology Surcharge* % of Permit Fee 4.6%
* Only assessed on Development-related applications, and does not include any impact fees.

Temporary Certificate of Occupancy
TCO Bond Per Sq. Ft. $2
TCO Administration Fee % of Cash Bond 5%
Review and approve the waste management plan and summary report for all projects with a construction value over $75,000 and all demolition projects Each $457 Re-Inspection Fee Assessed When the Work for a Scheduled Inspection is Not Ready to be Inspected
Each $147
Inspections for which no fee specifically indicated Per Hour $207 Additional Plan Review Required by Changes, Additions or Revisions Per Hour $229 Restore Service – A Permit to restore electric utility service (shut-off because of vacancy, fire, or official act), not inclusive of fees for work requiring additional permits Each Utility $190 Demolition Permit Each $104
Swimming Pool Permit Valuation Valuation-Based
Flat Fees
Solar Heating and Cooling System
Residential:
10kWth or less Each $551
Per Addl kWth Per kWth $18
Commercial:
30kWth or less Each $1,124
31-260 kWth Per kWth $10
260+ kWth Per kWth $7
Photovoltaic (PV) Installation
Residential:
10kWth or less Each $551
Per Addl kWth Per kWth $17
SolarAPP+ Permit Designs Each $450
Commercial:
30kWth or less Each $1,228
31-260 kWth Per kWth $8

Page 9 of 41 ends

9.2.a
Packet Pg. 141 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
260+ kWth* Per kWth $5
*plus additional building permit fee for ground-built support structure Residential Solar Energy Storage (Battery)
First Battery Each $385
Each Additional Battery Each $34
Miscellaneous Permit Fee
Remodels:

Bathroom Remodel or Repair (w/o structural modification) Each $759 Kitchen Remodel or Repair (w/o structural modification) Each $759 Re-roof
Up to 10x10 ft. Base $155
Each Additional 10x10 Ft Each $18
Window/Door Permit (w/o structural modification)
First 4 Windows and 1 Door Base $270
Each Additional Window Each $18
Each Additional Door Each $18
Special Inspection
Administration of Special Inspection – When required by construction type or special conditions by the Chief Building Official % of Building Permit 10% Code Compliance Investigation Each $259
Investigation Reports – Minimum Per Hour $207
Investigation Reports – With Photos Each $312
Investigation Fee – Work Without Permit* Violation Equal to Permit Fee Weekly Building Permit Activity Reports
Annual Each $174
Per Request Each $29
Overtime
Weekends (4 hr min) Per Hour $247
Holidays (4 hr min) Per Hour $287
During Regular Business Week Per Hour $247
Other Fees
Electric Vehicle Charging Station Per kWh $.39 kWh - $2.00 kWh Code Enforcement
First Notice / Inspection Each Courtesy (No Fee)
Subsequent Notices / Inspections Per Hour $415
*This provision does not apply to emergency work if the Chief Building Official determines that such work was urgent and necessary as well as if it is not practiable to obtain a permit before the work has

Page 10 of 41 ends

9.2.a
Packet Pg. 142 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Photograph Processing Actual Cost Actual Cost + 15% Admin Fee Mileage Per Mile $0.67/mile + 15% Admin Fee
Extension Fee Each $135
Posting Fee Each $101
Administrative Hearing Each $726
Title Search Fee Actual Cost Actual Cost + 15% Admin Fee Declaration of Substandard and/or Public Nuisance Notice Each $829 Removal of Declaration Each $726
Vehicle Abatement (Removal) Actual Cost Actual Cost + 15% Admin Fee Abatement (Cleanup) Cost Actual Cost Actual Cost + 15% Admin Fee Preparation of Job Specifications Each $622
City Council Approval of Contract Each $207
Contract Performance Inspection Each $207
Billing Each $104
Record Special Assessment Each $104
Filing a Special Assessment Each $207
Administrative Costs Pertaining to Violations of the Sign Ordinance Per Sign $21 Fines for Other City Building Violations
First Violation Ordinance and Building Code Not to Exceed $100 Second Violation (Within one [1] year) Not to Exceed $200 Each Additional Violation (Same Ordinance within one [1] year) Not to Exceed $500 Second Building Code Violation Each $500
Third Building Code Violation Each $1,000

ELECTRIC PERMIT
Minimum Fee Minimum $155
Electrical Service Each $155
Additional sub-feeders and distribution power panels Per $52 Miscellaneous Permit Fee Base $207
Miscellaneous Permit Fee % of Contract Cost 2%
Electric Plan Check Fee % of Electric Permit Fee 65%
Residential Dwellings % of Building Permit Fee 20%
In-Ground Swimming Pool, Spas, and Hot Tubs Each $312
In-Ground Swimming Pool, Spas, and Hot Tubs Plan Check % of Building Permit Fee 30%

Page 11 of 41 ends

9.2.a
Packet Pg. 143 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Above-Ground Swimming Pool, Spas and Hot Tubs Each $207 Electric Power Distribution Poles
Temporary Electrical Service Each $155
Additional sub-feeders and distribution power panels Each $52 Furnace/Air Conditioning
Residential Each $155
Commercial Minimum $312
Low Voltage, Protective, Security Signal and Communications Circuits % of Building Permit Fee 3% Electric Signs and Outline Lighting Minimum $155
Commercial or Industrial
Office / Light Industrial % of Building Permit Fee 15%
Retail Sales % of Building Permit Fee 20%
Food Markets % of Building Permit Fee 30%
Heavy Industrial % of Building Permit Fee 30%
Restaurants % of Building Permit Fee 35%
Other % of Building Permit Fee 35%

PLUMBING PERMIT
Minimum Fee Minimum $155
Miscellaneous Permit Fee Each $155
Miscellaneous Permit Fee % of Contract Cost 2%
Residential Dwellings % of Building Permit Fee 15%
Swimming Pools % of Building Permit Fee 10%
Furnance/Air Conditioning
Residential Each $155
Commercial % of Building Permit Fee 15%
Commercial or Industrial
Office % of Building Permit Fee 10%
Retail Sales % of Building Permit Fee 10%
Food Markets % of Building Permit Fee 10%
Industrial % of Building Permit Fee 10%
Restaurants % of Building Permit Fee 15%
Other % of Building Permit Fee 15%
Heat Pump Water Heaters Each $155
Water Heaters Each $155
Plumbing Plan Check Fee % of Plumbing Permit $1

MECHANICAL PERMIT

Page 12 of 41 ends

9.2.a
Packet Pg. 144 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Minimum Fee Minimum $155
Miscellaneous Permit Fee Each $155
Miscellaneous Permit Fee % of Contract Cost 2%
Residential Furnace/Air Conditioning (replace in-kind) Each $213 Residential Dwellings % of Building Permit Fee 15%
Swimming Pools % of Building Permit Fee 10%
Furnance/Air Conditioning
Residential Each $155
Commercial % of Building Permit Fee 15%
Commercial or Industrial
Office % of Building Permit Fee 10%
Retail Sales % of Building Permit Fee 10%
Food Markets % of Building Permit Fee 10%
Industrial % of Building Permit Fee 10%
Restaurants % of Building Permit Fee 15%
Other % of Building Permit Fee 15%
Mechanical Plan Check Fee % of Mechanical Permit Fee 65%

ENGINEERING FEES
Routine Building Permit Reviews
Data Collection Processing Per Hour (2 hr Min.) $259
Inspection Per Hour (2 hr Min.) $245
Non-Routine Building Permit Reviews
Initial Deposit Deposit Range $500 - $10,000
Hourly Review Per Hour $259
Special Projects
Minimum Fee Each $3,238
Hourly Review Per Hour $259
Consultant Review Actual Cost Consultant Cost + Admin Fee Inspection Fee Per Hour (2 hr Min.) $245
Overtime Inspections:

During Regular Business Week Per Hour $290
During Weekends Per Hour (3 hr. Min) $290
During Holidays Per Hour (3 hr. Min) $335
Fee Notes
The DV GHAD and NWSR GHAD fees and charges shall be the same as those established by the City of San Ramon for all similar services except as otherwise detailed in this Schedule A plan checking and inspection fee will be assessed for all projects that require plan reviews and/or inspections related to DV GHAD or NWSR GHAD facilities, including toe-drains DV GHAD and NWSR GHAD Fees

Page 13 of 41 ends

9.2.a
Packet Pg. 145 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Drainage Permit Application Fee
Routine Projects (Processing & Filing) Per Hour (2 hr Min.) $259 Special Projects (Processing & Filing)
Initial Deposit Deposit Range $500 - $10,000
Site Development
Plan Check Fee
$0 - $250,000 % of Improvement 3.10%
$250,000-$1,000,000 % of Improvement 3.20%
$1,000,000+ % of Improvement 2.40%
Consultant Review Actual Cost Consultant Cost + Admin Fee Inspection Fee During Regular Business Week
$0 - $250,000 % of Improvement 5.80%
$250,000-$1,000,000 % of Improvement 6.70%
$1,000,000+ % of Improvement 5.60%
Overtime Inspection Fee During Weekends Per Hour (3 hr. Min) $290 Overtime Inspection Fee During Holidays Per Hour (3 hr. Min) $335 Building Permit Review Fees:

Routine Building Permit Reviews
Data Collection Processing Per Hour (2 hr Min.) $259
Inspection Per Hour (2 hr Min.) $245
Non-Routine Building Permit Reviews
Initial Deposit Deposit Range $500 - $10,000
Hourly Review Per Hour $259
Special Projects
Minimum Fee Each $3,238
Hourly Review Per Hour $259
A Site Development Permit shall be required for the plan check and inspection of all construction sites, improvements of non-residential and residential developments, including The Site Development Permit shall serve as a grading permit, an erosion and sedimentation control permit, parking lot construction permit, and encroachment permit for curb gutter, A building permit review fee will be required for all building permit applications requiring Engineering review, and will be collected by the Building Division at the time of application submittal. Building Permit Reviews within the DV GHAD or NWSR GHAD will be charged the applicable DV GHAD and NWSR GHAD Building Permit Review fees.

Non-routine projects that require in excess of four (4) hours of staff time (two [2] hours staff review + two [2] hours inspection) may be assessed charges based on the actual staff time For all parcels within the DV GHAD and NWSR GHAD, the Routine and Non-Routine Building Permit Review fees shall be in lieu of the Public Works Engineering Services Division Buildin Special projects including Annexation Agreements, Engineers Report, Revisions to the Plan of Control and Request for Other Services will be assessed a minimum fee of $1,000.00

ENGINEERING FEES

Page 14 of 41 ends

9.2.a
Packet Pg. 146 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Consultant Review Actual Cost Consultant Cost + Admin Fee Inspection Fee Per Hour (2 hr Min.) $245
Overtime Inspections:

During Regular Business Week Per Hour $290
During Weekends Per Hour (3 hr. Min) $290
During Holidays Per Hour (3 hr. Min) $335
Initial Deposit Deposit Range $500 - $10,000
Encroachment Permits
Hauling and Oversize Loads
Single Trip Each $16
Annual Trip Each $90
Permit Application & Filing Fee:

Routine, which include Curb, Gutter, Sidewalks, PODs, and Cross Drains Per Hour (1 hr Min.) $259 Non-Routine Projects Per Hour (3 hr. Min) $259
Permit Inspection Fee:

Routine Projects Per Hour (2 hr Min.) $245
Non-Routine Projects Per Hour (3 hr. Min) $245
Stormwater Quality Device (C.3) Inspection Per Hour (2 hr Min.) $245 Permit Application, Filing, Inspection, and Review Fee – Special Projects Initial Deposit Deposit Range $500 - $25,000
Hourly Review Per Hour $259
Overtime Inspection Fee During Regular Business Week Per Hour $290 Overtime Inspection Fee During Weekends Per Hour (3 hr. Min) $290 Overtime Inspection Fee During Holidays Per Hour (3 hr. Min) $335 Subdivision / Preliminary Development Review
Preliminary Development Review Fee
Plans / Studies Awaiting Entitlement - Initial Deposit Deposit $3,500 Mixed Use Development Projects - Initial Deposit Deposit $4,000 Hourly Review Per Hour $259
Routine Projects Per Hour (2 hr Min.) $259
Utility Per Hour (3 hr. Min) $259
Day Care/Learning Center of 14 or Fewer Kids Per Hour (1.5 hr Min.) $259 Day Care/Learning Center of 15 or More Kids:

Initial Deposit Deposit $1,500
Hourly Review Per Hour $259
Minor Subdivisions

Page 15 of 41 ends

9.2.a
Packet Pg. 147 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Initial Deposit Deposit $3,000
Consultant Review Actual Cost Consultant + Admin Fee
Major Subdivisions
Initial Deposit Deposit $4,000
Per Lot Per Lot $324
Consultant Review Actual Cost Consultant + Admin Fee
Monument Checking Fee – Any error found in placement, course or identification of survey monuments shall require payment of fee as indicated Actual Cost Consultant + Admin Fee
Tentative Map Technical Review Fee
Initial Deposit Deposit $3,000
Hourly Review Per Hour $259
Single Parcel Plan Review Fee Per Parcel $130
Certificates of Compliance, Property Mergers, Parcel Map Waivers & Lot Line Adjustments
Parcel Review Per Parcel $389
Hourly Review Per Hour $259
Street Vacations
Initial Deposit Deposit $518
Hourly Review Per Hour $259
Bonds, Letters of Credit and Deposits for Improvements
Improvement Bond % of Improvement 100%
Administrative Fee Each $518
Base Map Revision Fee (Applicable at filing of Final Map, Parcel Map or Lot Line Adjustment)
County Fee Each County Fee
Administrative Fee Each County Fee
Other Fees
Appeals Each $648
Peer Review of Special Studies Actual Cost Consultant + Admin Fee Technology Surcharge % of Permit Fee 4.60%
Engineering Research
Engineering Drawings, Reports, Letters, and Miscellaneous Per Hour (0.5 hr Min.) $259 Flood Zone Research
Lot Research Per Lot $86
Hourly Review Per Hour $259

CREEK STUDY AND DRAINAGE MITIGATION

Page 16 of 41 ends

9.2.a
Packet Pg. 148 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Twin Creeks Watershed Per Developable Acre $3,106
South San Ramon Creek (Main Stem) Per Developable Acre $1,553 Oak Creek Watershed Per Developable Acre $1,812
Drainage Mitigation Fee Per SF of Site Impervious Surface $0.31

TRAFFIC MITIGATION FEES
Residential:

Single-Family Residential:

Less than 1,000 SF Per Dwelling Unit $3,537
1,000 - 1,499 SF Per Dwelling Unit $3,835
1,500 - 1,999 SF Per Dwelling Unit $4,005
2,000 - 2,499 SF Per Dwelling Unit $4,134
2,500 - 2,999 SF Per Dwelling Unit $4,261
3,000 - 3,999 SF Per Dwelling Unit $4,389
4,000 SF or Greater Per Dwelling Unit $4,432
Apartment, Townhome, Condo Per Dwelling Unit $2,312
Other Per P.M. Peak Hour Trip $4,862
Non-Residential:

Retail Per 1,000 SF $8,366
Office Per 1,000 SF $10,498
Service Commercial Per 1,000 SF $4,881
Other Non-Residential Per 1,000 SF $4,862
Tassajara Area Benefit Fee Per Dwelling Unit $13,651
Southern Contra Costa JEPA Traffic Mitigation Fee
Contra Costa Sub-Regional Fee
Single / Multi-Family Residential Each $5,327
Apartment, Townhome, Condo Per Dwelling Unit $5,327
Office Per SF $8
Commercial Retail Per SF $5
Other Each $5,273
Southern Contra Costa Regional Fees
Single / Multi-Family Residential Each $1,906
Industrial Per SF $5
Other Per Avg Peak Hour Trip $6,609 Page 17 of 41

9.2.a
Packet Pg. 149 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Accessory Dwelling Unit Per Dwelling Unit $0
Affordable Housing Per Dwelling Unit $0
Tri-Valley Transportation Development Fees
Single Family Residential Per Dwelling Unit $7,146
Multi-Family Residential Per Dwelling Unit $4,213
Office Per SF $10
Retail Per SF $6
Industrial Per SF $5
Other Per Avg Peak Hour Trip $6,609
Accessory Dwelling Unit Per Dwelling Unit $0
Affordable Housing Per Dwelling Unit $0

TRANSPORTATION SERVICES DIVISION
Preliminary Development Review Fee - Day Care / Learning Center Per Hour (1.5 hr Min.) $259

PUBLIC SERVICES FEES
Administration Per Hour $190
Field – Regular Per Hour $165
Field – Overtime Per Hour $197
Field – Call-Out/Emergency Stand-By (Two (2) Hour Minimum) Per Hour $197 Field - Holiday Per Hour $229
Commercial Recycling Transporter Permit
Application Per Application $65
Renewal Annually $41
Additional Fees & Charges
Extra Garbage Tags & Yard Trimmings Bags1 Each $12
Additional Sports Field Mowing/Cricket Pitch Rolling For Enhanced Maintenance Per Field $247 Staffing Rates
NOTES:

1. This fee is established by the Franchise Agreement (C2018-070) with Alameda County Industries of San Ramon, Inc. The fee was approved by the City Council on November 21. 2, 2022 by Resolution No 2022 144

Page 18 of 41 ends

9.2.a
Packet Pg. 150 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26

POLICE DEPARTMENT
Ink Cards
City Resident per card Each $23
Non-Resident – first card Each $33
Non-Resident – each additional card Each $33
Livescan*
City Resident Each $34
Non-Resident Each $44
Teachers employed by San Ramon Valley Unified School District Each $44 *Additional DOJ, FBI and other fees apply
Records
Police Report Per Page $0.10
Police Report - Redacted Per Page $0.10
Subpoena Duces Tecum / Deposition Subpoenas**
Production of Business Records State Code $15
Unsworn Employees Per Employee / Day $275
Sworn Officers Actual Cost Actual Cost
CDs, DVDs, Flash Drives Each $10
**includes the rates plus all reasonable expenses
Driving Under the Influence (DUI)
Admin Fee Each $147
Sergeant Per Hour $231
Corporal Per Hour $202
Officer Per Hour $186
PST Per Hour $130
Management Review Fee (Captain) Per Hour $214
Other Fees
Car Seat Inspections
Resident Each $0
Non-Resident Each $46
2022 by Resolution No. 2022-144.

Fingerprinting

Page 19 of 41 ends

9.2.a
Packet Pg. 151 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Processing Fee for one (1) Day Liquor License Letter to Alcoholic Beverage Control (ABC) Board
Each $42
False Alarms
(2nd Alarm) Within Permit Year Each $50
(3rd Alarm) Within Permit Year Each $150
(4th Alarm) Within Permit Year Each $300
Any Additional (Above 4th) Within Permit Year Per $300
Special Events Staffing − (two [2] hour minimum)
Administrative Fee Per Hour $147
Sergeant Per Hour $231
Corporal Per Hour $202
Officer Per Hour $186
PST Per Hour $130
Management Fee Per Hour $214
Crime Prevention
Site Inspection / Plan Reviews Hourly $147
Bingo / ID Cards
ID Cards Each $16
Permit Each $25
Card Room Employee Work Permit
Card Room Application Fee Each $1,496
Card Room Annual Licensing Fee Per Table $10,521
New Work Permit Each $214
Renewal Work Permit Each $107
Citation Sign-Off
Resident Each $0
Non-Resident issued by other Police Department Each $28 Massage Permit Fees
Massage Establishment
New Each $612
Annual Renewal Each $502
Massage Therapist (Owner / Operator)
New Each $538
Annual Renewal Each $502
Outcall Massage Permit
New Each $612
Annual Renewal Each $502
Masseur / Masseuse Permit

Page 20 of 41 ends

9.2.a
Packet Pg. 152 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
New Each $406
Annual Renewal Each $310
Taxicab / Passenger Transport Permit Fees
Taxi / Transport Establishment
New Each $612
Annual Renewal Each $502
Driver Permit − (Owner / Operator)
New Each $612
Annual Renewal Each $502
Driver Permit
New Each $406
Annual Renewal Each $310
Solicitor Permit Fees Per Permit $296

VIOLATION AND FINE SCHEDULE
Violation of City Ordinance
Infractions
First Violation Not to Exceed $100
Second Violation – (Within one [1] year) Not to Exceed $200 Each Additional Violation - (Within one [1] year) Not to Exceed $550 Misdemeanor** Not to Exceed $1,000
**Not to Exceed Fine and / or imprisoment of 6 months
Animals:

Animal Noise (B2-70) Not to Exceed $100
Animal Waste (Public or Private Property) (B2-71) Not to Exceed $100 Health & Sanitation
Living in Vehicles (B6-221) Not to Exceed $100
Smoking Prohibited (B6-73) Not to Exceed $100
Fireworks:

Possession or Ignition of Firecrackers (Excluding Safe/Sane H&S Section 12529) (B4-1) Not to Exceed $100 Damage to Property
Removal or Destruction Including Shrubbery, Artifacts, or Archaeological Site (B5-30A) Not to Exceed $100 Break or Deface Any Building, Sign, Fence, Bench, Structure, Apparatus, Equipment, or Property (B5-30B)
Not to Exceed $100
Mark, Print, Write, Sign, Card, Display or Similar Inscription or Device on Public or Private Property (without a permit) (B5-30C)
Not to Exceed $100
Noise Sources
Page
21 of 41

9.2.a
Packet Pg. 153 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Internal Combustion Engines Causing Excessive Noise Between 8:00PM and 8:00AM (Without a Permit) (B6-99)
Not to Exceed $100
Construction Projects (Unlawful M-F before 7:30 AM and after 7:00 PM; Sat-Sun Prior to 9:00 AM and after 6:00 PM) (B6-100)
Not to Exceed $100
City Parks
Violation of Park Hours (B5-11) Each $125
Designated Pedestrian Use (B5-13A) Not to Exceed $100
Bicycle or Skateboard Hazard (B5-13B) Not to Exceed $100 Bicycle in Skate Park (B5-13C) Each $125
Skate Park Helmet (B5-13D) Each $75
Littering (B5-18) Each $200
Sound Amplification Devices (Without a Permit) (B5-28) Not to Exceed $100 Curfew (B7-231) Each $125
Vehicle Restrictions within City Parks
Operation on Roads or Trails (Without a Permit) (B5-12A) Not to Exceed $100 Excess Speed (B5-12B) Not to Exceed $100
Unlicensed Vehicle (B5-12C) Not to Exceed $100
Parking in Restricted Area (B5-12D) Not to Exceed $100
Parking After Hours (B5-12E) Not to Exceed $100
Abandoned Vehicle (B5-12F) Not to Exceed $100
Wash, Repair, or Advertise for Sale (B5-12G) Not to Exceed $100 Excessive Noise from Muffler or Exhaust System (B5-12H) Not to Exceed $100 Public Consumption of Alcoholic Beverages
Prohibition of Public Alcohol Consumption (B7-1) Not to Exceed $100 Unlawful Juvenile Gathering on Private Property (Five [5] or more person(s) < 21 year age of where alcohol is in possession or being consumed by person(s) < 21) (B7-12) Each $1,000
Police Services at parties, gatherings, or events requiring a response: (B7-13 & B7-14) Administrative Fee Per Hour $142
Sergeant Per Hour $223
Corporal Per Hour $195
Officer Per Hour $180
PST Per Hour $126
Management Fee Per Hour $206
False Reports
False Reports to City Employee / Officer (B7-21) Not to Exceed $100 Labor Disputes
Obstruction of Public Ways (B7-125) Not to Exceed $100 Page 22 of 41

9.2.a
Packet Pg. 154 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Intimidation - During Picketing Prohibited (B7-126) Not to Exceed $100 Intimidation - During Assembly Prohibited (B7-127) Not to Exceed $100 Opprobious Language Prohibitied (B7-128) Not to Exceed $100 Solicitors / Peddlers
Solicitors / Peddlers (Without a permit) (B7-145) Not to Exceed $300 Soliciting on Vehicles (B7-149) Not to Exceed $100
Roadside Selling of Vehicle (B6-211) Not to Exceed $100 Firearms
Discharge Restrictions (B7-247) Not to Exceed $100
Possession of Firearms, Pellet Guns, and Similar Weapons by Minors Not to Exceed $100 Graffiti
Graffiti Prohibited on Public or Private Property (B7-254) Not to Exceed $100 Skateboard, Bicycle, and Wheeled Devices
Prohibited Use on Public or Private Property (B7-282A) Not to Exceed $100 Tricks & Stunts (B7-282B) Not to Exceed $100
Unattended Causing Injury Hazard (B7-282C) Not to Exceed $100 Parking Restrictions
Stopping, Standing, Parking - Curb Marking (B8-1) Each $50 Time Limit Parking (B8-2) Each $50
Parking / Stopping - Construction Area (B8-3) Each $50
Parking Designated Zones - Private Proeprty (B8-4) Each $50 Parking within Marked Spaces (B8-5) Each $50
Temporary / Emergency Parking Sign / Barriers (B8-6) Each $75 Permit Parking (B8-21) Each $125
Parking Oversized Vehicles (B8-31) Each $125
Parking in Fire Lane (B8-39) Each $125
Parking Truck / Trailer (Exceeding 10,000 lbs) (B8-51) Each $125 Class or Program Per Transaction Actual Cost
Facility Rentals
Transaction Fee Per Transaction Actual Cost
Rental Date Change Fee Per Change $125
Permit Modification Fee (14 Days or Less prior to Event Date) Per Change $100 Additional Use Request to Quarterly Permit Per Change $25 CoSponsored Group Rentals for Fields, Gyms, and Pools

PARKS AND COMMUNITY SERVICES FEE SCHEDULE
Transaction Fee
Page
23 of 41

9.2.a
Packet Pg. 155 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Cancellation (not to exceed $200) Per Transaction $25 or 25% Late Payment Fee (For Quarterly Use Permits) - (not to exceed $500) % of Rental Fee 5% Facility Deposits
Small Room Deposit $125
Artist Studio, Sound Studio Deposit $125
Medium Room Deposit $250
Large Room Deposit $500
Grand Room
Weekday: Monday-Thursday Deposit $500
Weekend: Friday-Sunday Deposit $1,000
Kitchen Deposit $100
Dougherty Valley Performing Arts Center Deposit $800
Front Row Theater Deposit $400
Glass House & Walnut Barn Deposit $1,000
Aquatic Group Picnic Deposit $100
Gymnasium Deposit $500
Facility Cancellation Fees
Small / Medium:
30 days or Less % of Rental Fee 100%
31-60 days % of Rental Fee 75%
61-89 days % of Rental Fee 50%
90+ days % of Rental Fee 0%
Recreation Guide and Playbill Advertising Fees
Business Card
General:

One Issue $145
Two Issues 20% Off $232
Three Issues 20% Off $349
Four Issues 20% Off $464
Non-Profit:

One Issue $117
Two Issues 20% Off $186
Three Issues 20% Off $278
Four Issues 20% Off $372
One-eighth (⅛) Page
General:

One Issue $182
Advertising Fees
Page
24 of 41

9.2.a
Packet Pg. 156 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Two Issues 20% Off $290
Three Issues 20% Off $436
Four Issues 20% Off $581
Non-Profit:

One Issue $145
Two Issues 20% Off $232
Three Issues 20% Off $349
Four Issues 20% Off $523
One-quarter (¼) Page
General:

One Issue $290
General:

One Issue $327
Two Issues 20% Off $523
Three Issues 20% Off $784
Four Issues 20% Off $1,045
Non-Profit:

One Issue $262
Two Issues 20% Off $419
Three Issues 20% Off $627
Four Issues 20% Off $836
One-half (½) Page
General:

One Issue $617
Two Issues 20% Off $998
Three Issues 20% Off $1,400
Four Issues 20% Off $1,975
Non-Profit:

One Issue $494
Two Issues 20% Off $790
Three Issues 20% Off $1,186
Four Issues 20% Off $1,581
Full Page
General:

One Issue $1,234
Two Issues 20% Off $1,975
Three Issues 20% Off $2,962
Four Issues 20% Off $3,949 Page 25 of 41

9.2.a
Packet Pg. 157 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Non-Profit:

One Issue $988
Two Issues 20% Off $1,581
Three Issues 20% Off $2,369
Four Issues 20% Off $3,159
Inside Back Cover
General:

One Issue $1,452
Two Issues 20% Off $2,323
Three Issues 20% Off $3,485
Four Issues 20% Off $4,646
Non-Profit:

One Issue $1,452
Two Issues 20% Off $2,323
Three Issues 20% Off $3,485
Four Issues 20% Off $4,646
General Advertising
Curtain Call $88
Business Card
One Issue $138
Two Issues 20% Off $372
Three Issues 20% Off $152
Four Issues 20% Off $409
One-eighth (⅛) Page
One Issue $145
Two Issues 20% Off $393
Three Issues 20% Off $160
Four Issues 20% Off $431
One-quarter (¼) Page
One Issue $220
Two Issues 20% Off $594
Three Issues 20% Off $242
Four Issues 20% Off $653
One-half (½) Page
One Issue $440
Two Issues 20% Off $1,188
Three Issues 20% Off $484
Four Issues 20% Off $1,307 Page 26 of 41

9.2.a
Packet Pg. 158 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Full Page
One Issue $880
Two Issues 20% Off $2,376
Three Issues 20% Off $968
Four Issues 20% Off $2,614
Four-Color Glossy Rates
One-quarter (¼) Page $414
One-half (½) Page $688
Full Page $1,375
Performing Arts Brochure
One-half (1/2) Page $220
Full Page $440
Performing Arts Marketing Package Per Package $500
Special Event Permit Application
Tier III and/or payment of a fee is required by Ordinance No. 231 as outlined in the Municipal Code under Division B1 AMUSEMENTS Chapter IV Sections B1 – 121 Per Application $2,268 Tier II Per Application $747
Tier I Per Application $327
Private Fitness Programs Special Permit Fee Application Per Application $25 Outdoor Fitness Permit (Resident) Per Hour $21
Outdoor Fitness Permit (Non-Resident) Per Hour $35
Additional Staff Time (two hour increments)
Building Attendant II Per Hour $24
Recreation Technician Per Hour $85
Recreation Coordinator Per Hour $111
Commercial Film Fees
Commercial Feature Film / Television Productions / Television Commercials / Industrial Film / Video / Photography Production Fee Per Day $1,100 Non-Profit Film / Video / Documentary Per Day $550
Photography and Event Video Fees
Professional Royalty Free Licensing Fee/Annual Per Year $220 Professional Royalty Free Licensing Fee/Day Per Day $55 Rights Managed Independent Fee Per Day $550
Resident Per Hour $100
Non-Resident Per Hour $125
Special Events Permit Application, Photo Film Fees And Gallery Fees Glass House Interior Photography Fee (Minimum 2 hours)
Page
27 of 41

9.2.a
Packet Pg. 159 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Pushcart Food Vendor Fees
Application Fee - Single Day Each $55
Application Fee - Two Day Weekend Permit Each $100
Gallery Fees*
Lindsay Dirkx Brown Gallery Exhibit Fee Per Month $55
Special Event Lifeguard Fees (Guard Fee)
Lifeguard Fees (Guard Fee) Per Month $23.5
Processing Fee Per Application $928
Installation/Removal Fee Per Banner $90
Pole Rental Fee Per Pole $16
Low Resolution JPEG via email (72 dpi) Per Image $5
Medium Resolution JPEG via email (150 dpi) Per Image $10 High Resolution JPEG via email (300 dpi) Per Image $15
Copy of VHS cassette or DVD Per Copy $25
Copy of recording on CD Per CD $20
Memorial Program Fees1
Memorial Plaque Purchase for Existing Tree Per plaque $2,000 Memorial Tile 4” x 8” Per Tile $350
Memorial Benches without Concrete Slab Per Bench $3,500 Memorial Benches with Concrete Slab Per Bench $5,000
Glass House Brides Room & Outdoor Venue –
Resident & Non-Profit
Per Hour $205
Glass House Brides Room & Outdoor Venue – Private Non-Resident / Commercial Per Hour $255 Per Hour Per Hour $70
Per 4 Hours Per 4 Hours $249
Fountain Room
Room Set Up Per Event $78
Non-Profit:

Weekday Per Hour $73
Weekend Per Hour $151
Resident:

Glass House Brides Room and Outdoor Venue Rentals
Walnut Barn Picnic Rentals:

Building Rentals
Banner Permit Application Fees
Commercial Fees For Duplication Of Historic Media Materials & Memorial Program Fees Commercial Fees For Duplication Of Historic Media Materials NOTES1: Fees for additional memorial items shall be based upon the cost to the City for providing such services including direct cost of item, staff time, and maintenance costs

Page 28 of 41 ends

9.2.a
Packet Pg. 160 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Weekday Per Hour $145
Weekend Per Hour $301
Private Non-Resident or Commercial:

Weekday Per Hour $182
Weekend Per Hour $377
Ridgeview Room
Room Set Up Per Event $78
Non-Profit:

Weekday Per Hour $65
Weekend Per Hour $144
Resident:

Weekday Per Hour $129
Weekend Per Hour $288
Private Non-Resident or Commercial:

Weekday Per Hour $162
Weekend Per Hour $360
Bella Vista Room
Room Set Up Per Event $52
Non-Profit:

Weekday Per Hour $56
Weekend Per Hour $89
Resident:

Weekday Per Hour $112
Weekend Per Hour $177
Private Non-Resident or Commercial:

Weekday Per Hour $140
Weekend Per Hour $222
Non-Profit:

Weekday Per Hour $46
Weekend Per Hour $78
Resident:

Weekday Per Hour $92
Weekend Per Hour $155
Private Non-Resident or Commercial:

Weekday Per Hour $115
Weekend Per Hour $194
Russell Room
Terrace Room/ Vista Grande Room/Art Studio 1&2/SRL Meeting Room

Page 29 of 41 ends

9.2.a
Packet Pg. 161 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Non-Profit:

Weekday Per Hour $43
Weekend Per Hour $59
Resident:

Weekday Per Hour $85
Weekend Per Hour $117
Private Non-Resident or Commercial:

Weekday Per Hour $107
Weekend Per Hour $147
Bella Vista A or B / Vista Grande A or B/ Gardenview/ Music Room / Art Studio 1/ Art Studio 2 / SROP Classroom A &B
Non-Profit:

Weekday Per Hour $35
Weekend Per Hour $51
Resident:

Weekday Per Hour $70
Weekend Per Hour $102
Private Non-Resident or Commercial:

Weekday Per Hour $88
Weekend Per Hour $128
Rooms 101, 102, 112A, 112B, 113, 114, 115, 204, 206, Community Room 2, PCS Conference Room, Community Room 1, SROP Classroom A or B* Non-Profit:

Weekday Per Hour $24
Weekend Per Hour $38
Resident:

Weekday Per Hour $48
Weekend Per Hour $75
Private Non-Resident or Commercial:

Weekday Per Hour $60
Weekend Per Hour $94
Notes:

Dance Studio
Non-Profit:

Weekday Per Hour $24
Weekend Per Hour $38
Resident:
*SROP Classroom A or B can only be rented while the pool is open to the public.

Page 30 of 41 ends

9.2.a
Packet Pg. 162 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Weekday Per Hour $48
Weekend Per Hour $75
Private Non-Resident or Commercial:

Weekday Per Hour $60
Weekend Per Hour $94
Kitchen (Kitchen rented in conjunctions with a Grand or Large Room) Non-Profit:

Weekday Per Hour $13
Weekend Per Hour $13
Resident:

Weekday Per Hour $25
Weekend Per Hour $25
Private Non-Resident or Commercial:

Weekday Per Hour $32
Weekend Per Hour $32
Kitchen Only
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Hour $85
Weekend Per Hour $85
Rose Garden**, Terrace Room Patio Area***, Ridgeview Room Patio Area****, Bella Vista Room Patio Area
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Hour $33
Weekend Per Hour $33
Rental Storage Fee
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Day $100
Weekend Per Day $100
Creative Studio 1-6
Resident:

Monthly Per Month $395
Weekly Per Week $125
Daily Per Day $35
Private Non-Resident or Commercial:

Monthly Per Month $494
Weekly Per Week $157
Daily Per Day $44
Sound Studio 1-2

Page 31 of 41 ends

9.2.a
Packet Pg. 163 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Planning Services Division Footnotes: Per Hour $12
Private Non-Resident or Commercial Per Hour $15
Co-Sponsored Groups
Weekday - San Ramon Library PCS Conference Room, Dougherty Station Library Community Room - Setup and Clean not included in fees - Room may be reserved one (1) year in advance
Per Hour
$16
Weekend - San Ramon Library PCS Conference Room, Dougherty Station Library Community Room - Setup and Clean not included in fees - Room may be reserved one (1) year in advance
Per Hour
$16
Notes:
*Kitchen rented in conjunction with a Grand or Large Room **All hours must correspond with all hours rented in the Fountain Room.

Rental Deposit Deposit $2,500
Resident Rental Fee Per Hour $350
Resident Non-Profit Rental Fee Per Hour $250
Resident − Private or Group
Weekday Per Hour $105
Weekend Per Hour $105
Non-Resident − Private or Commercial
Weekday Per Hour $135
Weekend Per Hour $135
Non-Profit Organizations:

Groups 1-50
Weekday Per Day $62
Weekend Per Day $78
Groups 51-149
Weekday Per Day $120
Weekend Per Day $150
CITY HALL ROTUNDA (10 hr. min.)

ALCOSTA SENIOR AND COMMUNITY CENTER AND RAMONA PARK GAZEBO RENTAL FEES Alcosta Senior and Community Center and Ramona Park Gazebo Rental Rates Central Park, Rancho San Ramon Community Park, Athan Downs Park, Alcosta Senior And Community Center Park And Gardens, Valley View Park, Ramona Park, San Ramon Sports Park, Memorial Park, Monarch Park, Sunrise Ridge Park, Critter Crossroads, and Hidden Valley Group Picnic Rental Fees ***All hours rented must correspond with all hours rented in the Terrace Room. ****All hours rented must correspond with all hours rented in the Ridgeview Room *****All hours rented must correspond with all hour rented in the Bella Vista Room

Page 32 of 41 ends

9.2.a
Packet Pg. 164 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Groups 150-200
Weekday Per Day $178
Weekend Per Day $222
San Ramon Resident
Groups 1-50
Weekday Per Day $124
Weekend Per Day $155
Groups 51-149
Weekday Per Day $239
Weekend Per Day $299
Groups 150-200
Weekday Per Day $355
Weekend Per Day $444
San Ramon Business
Groups 1-50
Weekday Per Day $143
Weekend Per Day $179
Groups 51-149
Weekday Per Day $275
Weekend Per Day $344
Groups 150-200
Weekday Per Day $409
Weekend Per Day $511
Non-Resident and Non-Resident Business
Groups 1-50
Weekday Per Day $155
Weekend Per Day $194
Groups 51-149
Weekday Per Day $299
Weekend Per Day $374
Groups 150-200
Weekday Per Day $444
Weekend Per Day $555
Food Truck Fee
Weekday Per Day $53
Weekend Per Day $53
San Ramon Olympic Pool & Aquatic Park And Dougherty Valley Aquatic Center - Group Picnic Rental Fees San Ramon Resident

Page 33 of 41 ends

9.2.a
Packet Pg. 165 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Groups up to 26
Weekday Per Session $168
Weekend Per Session $210
Groups 26 to 50
Weekday Per Session $335
Weekend Per Session $419
Groups 51 and larger
Weekday Per Session Call Parks & Community Services
Weekend Per Session Call Parks & Community Services
Groups up to 26
Weekday Per Session $210
Weekend Per Session $263
Groups 26 to 50
Weekday Per Session $419
Weekend Per Session $524
Groups 51 and larger
Weekday Per Session Call Parks & Community Services
Weekend Per Session Call Parks & Community Services
Amphitheater Set Up Fee Per Event $75
All Groups - 6 Hour Min Per Hour $125
All Groups - 2 Hour Min Per Hour $150
All Groups - 6 Hour Min Per Hour $84
All Groups - 2 Hour Min Per Hour $100
*May require Special Event Permit Application in addition to fee Turf Fields
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $15 Adult Co-Sponsored Organizations, San Ramon Residents $22 Non-Resident $36
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $251 For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $151 Central Park Amphitheater
Rancho San Ramon Amphitheater
Outdoor Athletic Facilities
Non-Resident
Amphitheater Use*

Page 34 of 41 ends

9.2.a
Packet Pg. 166 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day $251
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day $151
Extra Fee Per Hour $164
Light Fee at Sports Fields
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $31 San Ramon Residents Per Hour $31
Non-Resident Per Hour $61
Synthetic Fields – Tiffany Roberts Park
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $46 San Ramon Residents Per Hour $62
Non-Resident Per Hour $146
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day + Field Hourly Rate $151
Synthetic Fields – Rancho San Ramon Sports Park
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $68 San Ramon Residents Per Hour $90
Non-Resident Per Hour $219
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day + Field Hourly Rate $151
Synthetic Soccer / Lacrosse Field & Diamond - Sunrise Ridge Park Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $46 San Ramon Residents Per Hour $62
Non-Resident Per Hour $146
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251 Page 35 of 41

9.2.a
Packet Pg. 167 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $151 Sand Volleyball Courts
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $14 Adult Co-Sponsored Organizations, San Ramon
Residents
Per Hour $22
Non-Resident Per Hour $37
Tennis Courts
Storage Facilities
Rancho San Ramon Community Park Per Month Per Unit $205 Batting Cages**
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District
Per Hour $14
Adult Co-Sponsored Organizations, San Ramon Residents Per Hour $22 Non-Resident Per Hour $37
Concession Stands***
Scoreboard – (Central Park + Rancho San Ramon)
Private Organizations – Monthly Per Month $400
Private Organizations - Daily Per Day $100
Notes:
*The Rancho San Ramon Sports Park Batting Cages are included in the rental of the adjoining baseball field (Turf Field)
**For co-sponsored user groups only
***In conjunction with Special Event Permits
Extra Equipment
Additional microphones Per Day $26
Podium Per Day $26
Piano Per Day $103
Other Fees
Basic Sound and Light Package Included in Base Rental
Box Office Fees $100
Ticket Printing Per Ticket $0.30
Complimentary Ticket Fees *** Per Ticket $2.50
Cultural Growth Surcharge** Per Ticket $2
Cultural Growth Surcharge for non-ticketed events – less than 50 attendees Per Ticket $30 Cultural Growth Surcharge for non-ticketed events – 50 or more attendees Per Ticket $70 Dougherty Station Community Arts Center Front Row Theater Rental Fees

Page 36 of 41 ends

9.2.a
Packet Pg. 168 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Patron Ticket Mailing Fee Per Ticket $1
Patron Box Office Purchasing Fee Per Ticket $0.50
Patron Online Purchases Fee Per Ticket $1.50
Green Room Rental (when used as a dressing room or green room concurrently with a performance or rehearsal in the Front Row Theater) Per Hour (8 hr max) $48 Technical Theater Staff** Per Hour Per Person $40.00
Production Manager II Per Hour Per Person $49.00
House Staff** Per Hour Per Person $40.00
San Ramon Resident & Non-Profit / Co-Sponsored Organizations Free Events, Rehearsals (no admission fee), Ticketed Events, Theatrical Use & Fundraisers
Weekday Per 3 Hours $187
Weekend Per 3 Hours $241
Weekday Flat Fee Up to 8 Hours $374
Weekend Flat Fee Up to 8 Hours $481
Hourly Overtime Rate for use over eight (8) hours
Weekday Per Hour $80
Weekend Per Hour $107
Non-Resident Private or Commercial Organization
Free Events, Rehearsals (no admission fee), Ticketed Events, Theatrical Use & Fundraisers
Weekday Per 3 Hours $293
Weekend Per 3 Hours $347
Weekday Flat Fee Up to 8 Hours $588
Weekend Flat Fee Up to 8 Hours $694
Hourly Overtime Rate for use over eight (8) hours
Weekday Per Hour $80
Weekend Per Hour $107
Notes:
**Overtime and double time rates for staff will apply as required by law.

Dougherty Valley Performing Arts Center Rental Fees
Performance Base Rent (Full Day) − Includes Lobby, Theater, Dressing Rooms & Loading Dock
Weekend Friday through Sunday plus reimbursement for required technical theater and house management staff Per 8 Hour Day $1,194
*Cultural Growth Surcharge – Two dollars ($2.00) will be collected for every ticket sold at DVPAC and the Front Row Theater for all events with ticket prices over $5.00. This money will be used in the subsequent fiscal year to purchase/replace theatrical equipment and/or to offset rental fee for nonprofit groups producing a performance in either City theater. *** Comp Ticket fee for rental clients that exceed 5% of the house capacity or more than 10 comp tickets at the Front Row Theater

Page 37 of 41 ends

9.2.a
Packet Pg. 169 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Weekday Monday through Thursday plus reimbursement for required technical theater and house management staff Per 8 Hour Day $820
Additional Time (same day) plus reimbursement for required technical personnel Per Hour $130 Rehearsal and Technical Time – Weekday (Monday through Thursday) plus reimbursement for required technical personnel Per 8 Hour Day $497
Rehearsal and Technical Time – Weekend (Friday through Sunday) plus reimbursement for required technical personnel Per 8 Hour Day $610
Other Fees
Percentage Rent % of gross ticket sales 10%
Percentage Rent for 3 or more shows in the same day if greater than the base rent % of gross ticket sales 8% Outdoor Set Up Fee Per Event $75
Rent – Lobby Only Per 8 Hour Day $526
DVPAC Studio Rental (for a rehearsal or performance in the Studio Room) Per 8 Hour Day $469 Box Office Fees $415
DVPAC Studio Rental (when used in conjunction with a performance or rehearsal on the stage) Per 8 Hour Day $268
Ticket Printing Per Ticket $0.30
Cultural Growth Surcharge* Per Ticket $2
Cultural Growth Surcharge for non-ticketed events under 300 guest Surcharge $200 Cultural Growth Surcharge for non-ticketed events over 300 guest Surcharge $400 Patron Ticket Mailing Fee Each $1
Patron Box Office Ticket Purchasing Fee Per Ticket $0.50 Complimentary Ticket Fees Per Ticket $2.50
Patron Online Purchases Fee Per Ticket $1.50
Technical Theater Staff** Per Hour Per Person $40
Production Manager II Per Hour Per Person $49
Sign Language Interpreter Per Hour Per Person $107
House Staff Per Hour Per Person $40
Basic Sound / Light Production Each
Extensive Lighting Production Each $232
Extensive Sound Production Each $155
Spot Lights Per Light $103
Sales of Merchandise % Commission on Items Sold 25%
Fee Name Unit FY2025-26
Marley Dance Floor Per Event $155
Piano Per 8 Hour Day $103
Piano Tuning Each $250
Projector Rental Per Day $258 Page 38 of 41

9.2.a
Packet Pg. 170 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Notes:
**Overtime and double time rates for staff will apply as required by law.

Equipment Rental Fees
Change of Equipment Set-Up Fee Each $100
Additional Microphone with or without Stand Each $25
Full Length Podium (No PA System) Each $25
Portable Bar Each $125
Fountain Room 28’x 12’ Dance Floor (21 Modules) – Depending on availability and room capacity, additional dance floor modules may be rented for $10.00 for 4’ x 4’ module Each $200 Terrace Room 24’ x 8’ Dance Floor (12 Modules) – Depending on availability and room capacity, additional dance floor modules may be rented $10.00 for 4’ x 4’ module Each $150 Carpet Cleaning (Fountain Room) Each Maintenance Fee Included in Rental Carpet Cleaning (Terrace Room) Each Maintenance Fee Included in Rental Non Refundable- Sanitization/Cleaning Fee (Bundle) Each $125 Non Refundable – Sanitization/Cleaning Fee (Grande) Each $100 Non Refundable- Sanitization/Cleaning Fee (Large) Each $75 Non Refundable- Sanitization/Cleaning Fee (Medium) Each $50 Non Refundable- Sanitization/Cleaning Fee (Small) Each $25 Room A/V System + one (1) microphone – Portable A/V
System Per Day $50
Portable Stage
Small Each $250
Large Each $500
Room A/V System + one (1) microphone (SRCC FOUNTAIN, Terrace, Bella Vista, Ridgeview, Vista Grande) Per Day $100
Room A/V System + one (1) microphone (Russell) Per Day $50 Cocktail Tables Per Table $25
San Ramon Olympic Pool & Aquatic Park
Whole Facility (Daily Rate) + Lifeguard Fee (up to 11 hours) Per Day $1,804 Whole Facility (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $181 50-Meter Pool (Daily Rate) + Lifeguard Fee (up to 11 hours) Per Day $1,178 50-Meter Pool (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $118 San Ramon Olympic Pool & Aquatic Park And Dougherty Valley Aquatic Center Special Event And Lane Use Fees *Cultural Growth Surcharge – Two dollars ($2.00) will be collected for every ticket sold at DVPAC and the Front Row Theater for all events with ticket prices over $5.00. This money will be used in the subsequent fiscal year to purchase/replace theatrical equipment and/or to offset rental fee for nonprofit groups producing a performance in either City theater. *** Comp Ticket fee for rental clients that exceed 5% of the house capacity or more than 10 comp tickets at the Front Row Theater

Page 39 of 41 ends

9.2.a
Packet Pg. 171 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
25-Yard Pool (Lap / Training Pool) (Daily Rate) + Lifeguard Fee Per Day $785 25-Yard Pool (Lap / Training Pool) (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $79 Whole Facility – Two (2) Day Rental (Daily Rental) - Includes use of classroom and timing board (must have a qualified timer to operate timing board) Per Two Days $2,824 Whole Facility – Two (2) Day Rental (Hourly Rate after 11 hours each day) + Lifeguard Fee Per Hour $283 Dougherty Valley Aquatic Center
Whole Facility + Lifeguard Fee up to 11 hours Per Day $1,188 Whole Facility (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $119 Whole Facility – Two (2) Day Rental + Lifeguard Fee (up to 11 hours each day). Includes use of timing board (must have qualified timer to operate timing board) Per Two Days $1,880 Whole Facility – Two (2) Day Rental (Hourly Rate after 11 hours each day) + Lifeguard Fee Per Hour $188 Recreation Swim Team Meet + Lifeguard Fee Per Hour $87
Equipment
Colorado Computer
Deposit Deposit $500
Per Day Per Day $50
Water Polo Tournament
Water Polo Tank Per Hour Per Tank $87
Combined Lane Rental & Lifeguard 25 Yard Course Fee
City Co-Sponsored Groups Per Hour Per Lane $12
Resident Per Hour Per Lane $15
Non-Resident Per Hour Per Lane $19
Combined Lane Rental & Lifeguard 50 Meter Course Fee
City Co-Sponsored Groups Per Hour Per Lane $18
Resident Per Hour Per Lane $23
Non-Resident Per Hour Per Lane $29
Groups up to 50 (minimum of 3 guards required)
First 2 Hour Base $264
Each Additional Hours Per Hour $80
Groups 51 – 100 (minimum of 5 guards required)
First 2 Hour Base $528
Each Additional Hours Per Hour $158
Groups 101 – 150 (minimum of 7 guards required)
First 2 Hour Base $793
Each Additional Hours Per Hour $238
Non-Resident

Page 40 of 41 ends

9.2.a
Packet Pg. 172 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26
Groups up to 50 (minimum of 3 guards required)
First 2 Hour Base $333
Each Additional Hours Per Hour $80
Groups 51 – 100 (minimum of 5 guards required)
First 2 Hour Base $661
Each Additional Hours Per Hour $158
Groups 101 – 150 (minimum of 7 guards required)
First 2 Hour Base $993
Each Additional Hours Per Hour $238
Lifeguard Fees
Based on group size and amenities requested Per Hour Per Lifeguard $23.50 Inflatable Obstacle Course
Inflatable Add On Per Hour $50
Resident - Private
Individual Gym Floor Fee A, B, or C Per Hour $72
Main Gym Floor Fee Per Hour $139
For Profit Camp/ Tournament – Special Event Fee Per Day + Gym Hourly Rate $251 Scoreboard Fee Per Day Per Court $104
Non-Resident - Private
Individual Gym Floor Fee A, B, C Per Hour $91
Main Gym Floor Fee Per Hour $174
For Profit Camp/ Tournament – Special Event Fee Per Day + Gym Hourly Rate $251 Scoreboard Fee Per Day Per Court $104
City Co-Sponsored Groups
Individual Gym Floor Fee A, B, C Per Hour $54
Main Gym Floor Fee Per Hour $105
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Day + Gym Hourly Rate $251
Scoreboard Fee Per Day Per Court $50
Pine Valley And Iron Horse Gymnasia Rental Fees

Page 41 of 41 ends

9.2.a
Packet Pg. 173 Attachment: A: City of San Ramon Master Fee Schedule FY25-26 (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description

GENERAL FEES
Administrative Violations
First Violation Not to Exceed $100 No change
Second Violation – (Within one [1] year) Not to Exceed $200 No change Each Additional Violation - (Within one [1] year) Not to Exceed $500 No change For Each Additional Violation - Within 3 years Not to Exceed $1,000 No change Late Fine Fee Fine $5,000 No change
Appeals from Administrative Decision Under Municipal Code §A1-95 Per Appeal $446 No change All Reports, Fiscal Year Budget and printed/bound documents Actual Cost Actual Cost + 10% No change Document Certification Each $15 No change - State Set
Franchise Fees Deposit Actual Cost No change
Late Filing Fine for Fair Political Practices Commission Statements Per Day $10 No change Late Filing Fine for Fair Political Practices Commission Statements Max Fee $100 No change Late Payment Fee After a 30 day Grace Period $25 No Change Credit Card Convenience Fee % of the Total Transactions Actual Cost No change ACH/eCheck Processing Convenience Fee Per Transaction Actual Cost No change Marriage Ceremony Fee
Resident Per Ceremony $120 Increase by 3.53% CPI
Non-Resident Per Ceremony $133 Increase by 3.53% CPI
Notice of Intent to Circulate Petition Per Petition $200 No change - State Set Returned Check Charge
First Check/ACH Payment Per Check/ACH $25 No change - State Set Subsequent Checks/ACH Payments Per Check/ACH $35 No change - State Set Research Time Per Hour $130 Council Dierection and Increase by 3.53% CPI Subordination Fee
Processing Fee Each $486 Increase by 3.53% CPI
Subordination Processing Deposit $518 Increase by 3.53% CPI Actual Cost Actual Cost Actual Cost No change
Subpoena Fee*
Production of Business Records Each $15 No change - State Set Personal Appearance Per Employee / Day $275 No change - State Set *includes the rates plus all reasonable expenses
Copies - Color and black & white Per Sheet $0.10 No change CDs, DVDs, Flash Drives Each $10 No change
City Pins Each $24 Increase by 3.53% CPI

BUSINESS LICENSE FEES
General Business

Page 1 of 41 ends

9.2.b
Packet Pg. 174 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
0 – 5 Employees Annual $331 Council Dierection and Increase by 3.53% CPI 6 – 50 Employees Annual $331 Council Dierection and Increase by 3.53% CPI More than 50 Employees Annual $331 Increase by 3.53% CPI Lessors of Commercial Property
Less than 5,000 Square Feet Annual $331 Council Dierection and Increase by 3.53% CPI 5,001 – 10,000 Square Feet Annual $331 Council Dierection and Increase by 3.53% CPI More than 10,000 Square Feet Annual $331 Increase by 3.53% CPI Lessors of Residential Property
One unit only Annual $331 Council Dierection and Increase by 3.53% CPI Two (2) to Five (5) units Annual $331 Council Dierection and Increase by 3.53% CPI More than Five (5) units Annual $331 Increase by 3.53% CPI Flat Fee (+TUP or SEP) Annual $331 Increase by 3.53% CPI Temporary Place of Sale
One (1) Day Annual $331 Council Dierection and Increase by 3.53% CPI Two (2) to Five (5) Days Annual $331 Council Dierection and Increase by 3.53% CPI Six (6) to Thirty (30) Days Annual $331 Increase by 3.53% CPI Vending Machines
One (1) to Five (5) Machines Annual $331 Council Dierection and Increase by 3.53% CPI More than Five (5) Machines Annual $331 Increase by 3.53% CPI Other Business License Fees
Non-Standard Report Actual Cost Actual Cost No change - Actual Cost Business License Document Reprint Each $17 Increase by 3.53% CPI Standard Business License Listing (public data only) including CDs Each $38 Increase by 3.53% CPI New Business License Listing Each $43 Increase by 3.53% CPI Business License Fee pursuant to SB 1379 signed into law by Governor Brown on October 11, 2017; requires for a local business license or similar instrument or permit, or renewal thereof
Each $4 No change - State Surcharge

PLANNING
Annexation Processing Deposit1,2,3 $5,500 No Change - Deposits Architectural Review
Conceptual Each (1 ARB Meeting) $1,654 Increase by 3.53% CPI Minor Alteration Each $993 Increase by 3.53% CPI
Residential
New Construction
1 DU4 Deposit1,2,3 $1,500 No Change - Deposits
Amusements & Itinerant Businesses, Circuses, Carnivals, and Exhibitions Annexations

Page 2 of 41 ends

9.2.b
Packet Pg. 175 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
2-10 DU4
’s Deposit1,2,3 $2,000 No Change - Deposits
Up to 10 DU4's Deposit1,2,3 $2,500 No Change - Deposits More than 10 DU4's Deposit1,2,3 $3,500 No Change - Deposits Single-Family 2nd Story Addition Each $1,654 Council Dierection and Increase by 3.53% CPI New Construction-Small (up to 10,000 sf.) Deposit1,2,3 $2,000 No Change - Deposits New Construction-Large (greater than 10,000 sf.) Deposit1,2,3 $3,500 No Change - Deposits Alterations Deposit1,2,3 $2,000 No Change - Deposits
Administrative Review – ARB Review (All Districts) Deposit1,2,3 $1,000 No Change - Deposits Development Plan
Preliminary Housing Application Fee Each $1,654 Increase by 3.53% CPI Development Plan:

Conceptual Development Plan Review – ARB Review Each $3,970 Council Dierection and Increase by 3.53% CPI Conceptual Development Plan Review – PC Review Each $3,970 Increase by 3.53% CPI Development Plan (Residential) Deposit1,2,3 $5,500 No Change - Deposits Development Plan (Non-Residential) Deposit1,2,3 $5,500 No Change - Deposits Development Plan Amendment (Changes to Site Plan and/or Sq Ft) Administrative Review Each $3,308 Increase by 3.53% CPI Mitigation Monitoring Administration
Mitigation Monitoring Staff Time Deposit1,2,3 $3,000 No Change - Deposits Mitigation Monitoring Program Implementation / Special Peer / Consultant Review Deposit1,2,3 $4,000 No Change - Deposits Contra Costa County Clerk Filing Fee (Fee payable to County Clerk) Each5 Set by State No Change - Set by State Department of Fish & Game User Fee – Negative Declaration Each5 Set by State No Change - Set by State Environmental Impact Report Each5 Set by State No Change - Set by State Certified Regulatory Program Each5 Set by State No Change - Set by State Rezoning
Rezoning (All Districts) Deposit1,2,3 $8,000 No Change - Deposits Sign Review
Sign Permit (Each face copy charge) /Administrative Sign Review Each $414 Increase by 3.53% CPI Sign Permit (Each new sign requiring ARB Review) Each $3,970 Increase by 3.53% CPI Master Sign Program Approved Signs Each $414 Increase by 3.53% CPI New Master Sign Program Deposit1,2,3 $4,500 No Change - Deposits Master Sign Program Amendment Deposit1,2,3 $4,500 No Change - Deposits Office / Commercial / Industrial − New Construction, Additions, Alterations

Page 3 of 41 ends

9.2.b
Packet Pg. 176 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Temporary Sign Permit (Ninety [90] Consecutive Days) Each $414 Increase by 3.53% CPI Temporary Banner / Special Event Sign (Twenty-one [21] Consecutive Days, Maximum one [1] per Quarter)
Each $414 Increase by 3.53% CPI
Special Reviews
Document / File Research Deposit1,2,3 $500 No Change - Deposits Special Peer / Consultant Review Deposit1,2,3 $3,000 No Change - Deposits Specific Plan
Specific Plan (Consultant Prepared) Deposit1,2,3 $12,500 No Change - Deposits Subdivisions
Major Subdivision Deposit1,2,3 $6,500 No Change - Deposits Minor Subdivision Deposit1,2,3 $5,000 No Change - Deposits Urban Lot Split Each $5,459 Increase by 3.53% CPI
Text Amendment
General Plan Text Amendment Deposit1,2,3 $12,500 No Change - Deposits Specific Plan Text Amendment Deposit1,2,3 $12,500 No Change - Deposits Zoning Text Amendment Deposit1,2,3 $10,000 No Change - Deposits Time Extensions
Time Extension Approved Administratively (Architectural Review, Development Plan, Use Permit Major / Minor Subdivisions, Variance, etc.)
Each $331 Increase by 3.53% CPI
Time Extension Requiring Public Hearing(s) (Development Plan, Use Permit, Major / Minor Subdivisions, Variance, etc.) Deposit1,2,3 $2,000 No Change - Deposits Use Permits
Minor Land Use Permit and Amendments (All Districts) Deposit1,2,3 $4,000 No Change - Deposits Major Land Use Permits Requiring Public Hearing(s) & Amendment to Land Use Permit and/or Conditions of Approval (All Districts) Deposit1,2,3 $7,500 No Change - Deposits Temporary Land Use Permit (Special Events e.g. Christmas Tree and Halloween Lots, etc.)
Each $827 Increase by 3.53% CPI
Temporary Land Use Permit − Portable Outdoor Storage Unit (POSU) Residential Each $331 Council Dierection and Increase by 3.53% CPI Non-Residential Each $331 Increase by 3.53% CPI
Other Fees
Zoning Clearance Each $827 Increase by 3.53% CPI
Home Occupation Permit Each $248 Increase by 3.53% CPI
Short-Term Rental Registration

Page 4 of 41 ends

9.2.b
Packet Pg. 177 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
New Each $413 Council Dierection and Increase by 3.53% CPI Renewal Each $331 Council Dierection and Increase by 3.53% CPI Telecommunications Use Permit
Right-of-way Use Permit Deposit1,2,3 $3,500 No Change - Deposits Requiring Administrative Review Deposit1,2,3 $4,000 No Change - Deposits Requiring ARB Review Deposit1,2,3 $6,500 No Change - Deposits Requiring Planning Commission Review Deposit1,2,3 $6,500 No Change - Deposits Small Wireless Site License Fee Each $993 Increase by 3.53% CPI Variances
Single Family Residence Each $2,647 Increase by 3.53% CPI Variance Requiring Public Hearing (Each Application) Deposit $5,500 No Change - Deposits Variance – Processed Administratively Each $2,647 Increase by 3.53% CPI Minor Exception Each $2,316 Increase by 3.53% CPI
Appeals
Appeal from Zoning Administrator's Decision for Residential Property under SRMC §D7-8 Deposit1,2,3 $4,000 No Change
Appeal from Zoning Administrator's Decision for Non- Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500 No Change Appeal from Planning Commission Decision for Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500 No Change
Appeal from Planning Commission Decision for Non- Residential Property under SRMC §D7-8 Deposit1,2,3 $4,500 No Change Development Agreement & Amendments
Development Agreement & Amendments Deposit1,2,3 $6,000 No Change - Deposits Development Agreement Annual Review Each $662 Increase by 3.53% CPI Improvement Bonds & Deposits
Bond Amount Bond 100% of Improvement or
20% Cash Bond No Change - Bond Fee
Improvement Bond Processing Deposit1,2,3 $2,000 Bond Deposit Not Changing Zoning Review/Building Permit
Single Family – Remodel Each $495 Council Dierection and Increase by 3.53% CPI Single Family - New/Addition/Substantial Alteration- Each $992 Council Dierection and Increase by 3.53% CPI Multi-Family/Mixed-Use - Minor Improvement Each $827 Council Dierection and Increase by 3.53% CPI Multi-Family/Mixed-Use - New/Addition/Substantial Alteration Each $1,654 Increase by 3.53% CPI Commercial/Industrial - New Build Each $1,654 Increase by 3.53% CPI Commercial/Industrial - T.I. Each $331 Increase by 3.53% CPI

Page 5 of 41 ends

9.2.b
Packet Pg. 178 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Additional Plan Check fee (each review) Each $331 Increase by 3.53% CPI Address / Street Assignments
Single Address Each $496 Increase by 3.53% CPI
Multiple Addresses Deposit1,2,3 $1,500 No Change to Deposits Tree Removal Permit
Single-Family Residential Per Application $496 Increase by 3.53% CPI Subdivision Per Application $1,323 Increase by 3.53% CPI Non-Residential, Adminitrative Per Application $496 Increase by 3.53% CPI Non-Residential- Requiring Additional ARB Meeting*** Each $1,654 Increase by 3.53% CPI Miscellaneous Fees
Zoning Certification letter Deposit1,2,3 $500 No Change - Deposits Newspaper Advertisement Actual Cost Actual Cost No Change - Actual Cost Notices
Mailing (Under 100 Notices) Each $827 Increase by 3.53% CPI Mailing (Over 100 Notices) Each $1,323 Increase by 3.53% CPI Postage Per Address Current Postage Rate No Change - Postage Rate Microfilm and/or Laserfiche Fee
Administrative Application(s) (Each Application) Each $165 Increase by 3.53% CPI Application(s) Requiring Public Hearing (Excluding Major Subdivisions) Each $331 Increase by 3.53% CPI Residential Subdivisions (Major Subdivision) Each $993 Increase by 3.53% CPI Technology Fee Surcharge
Technology Fee Surcharge % of Permit or Application Fee 4.60% No Change

DEVELOPMENT IMPACT FEES
School Age Child Care Fees6
Commercial
Office Per Gross SF $0.61 No Change per Nexus Study
Retail Per Gross SF $0.34 No Change
Hotel Per Gross SF $0.18 No Change per Nexus Study
Industrial Per Gross SF $0.23 No Change per Nexus Study Residential
Single-Family Per Unit $1,163.36 No Change
Multi-Family Per Unit $626.84 No Change
Park and Recreation Facility Impact Fee6
Subdivision Projects
Single-Family Per Unit $5,300.00 No Change

Page 6 of 41 ends

9.2.b
Packet Pg. 179 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Multi-Family Per Unit $3,421.63 No Change
Non-Subdivision Projects
Single-Family Per Unit $23,951.43 No Change
Multi-Family Per Unit $14,370.86 No Change
Parkland Dedication Fee (Quimby Act)
Single-Family Per Unit lue of 687 s.f. of Land x 1.02 No Change Multi-Family Per Unit lue of 451 s.f. of Land x 1.02 No Change Open Space Development Impact Fee6
Single-Family Per Unit $1,141 No Change
Multi-Family Per Unit $750 No Change
Private Sector Art & Beautification Contribution Fee
New Residential & Commercial Development % of Building Valuation 0.01% No Change Additions / Alterations to Existing Residential & Commercial Dev. % of Building Valuation 0.005% No Change Affordable Housing Impact Fee7
Commercial
Office, Retail, Hotel Per Gross SF $4.85 No Change
Industrial Per Gross SF $3.64 No Change
Residential
Single-Family or Multi-Family Under 10 Units Per Liveable SF $15.16 No Change Single-Family Detached, 10+ Units On-Site Construction of Units $16.27 No Change Multi-Family, 10+ Units On-Site Construction of Units On-Site Construction of No Change Westside Specific Plan Recovery
Non-Residential Per Gross SF $0.56 Increase by 3.53% CPI Residential Per Unit $713.49 Increase by 3.53% CPI
Long-Range Planning Recovery Fees
General Plan Recovery Costs % of Building Valuation 0.55% Increase by 3.53% CPI Zoning Ordinance Recovery Costs % of Building Valuation 0.17% Increase by 3.53% CPI San Ramon Village Specific Plan Recovery Fee
Commercial Per Gross SF $0.44 No Change per Nexus Study Residential Per Unit $598.11 No Change per Nexus Study
Planning Services Division Footnotes:

1. Time and Materials charges are calculated using an hourly rate of $330.00 for each employee working on the application.

2. Deposit amounts are set at assumed average cost of time and materials to provide the service. When the deposit has been drawn by 80%, an additional deposit of 25% to 50% of the original deposit fee will be required to continue processing application(s) as determined by the Planning Services Division. Applications may be deemed withdrawn if account deficits exist.

3. Project Applicants shall pay a cumulative total fee and/or deposits for each application type required.

4. DU = Dwelling Unit

Page 7 of 41 ends

9.2.b
Packet Pg. 180 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Building Permit Fees (Valuation-Based)
$1.00 to $500.00 Base $207 Increase by 3.53% CPI
Projects Valued at $500 Base $207 Increase by 3.53% CPI $501.00 to $2,000.00 Each Addl. $100 or fraction
thereof $14 Increase by 3.53% CPI
Projects Valued at $2,000 Base $417 Construction Valuation - Cost per Sqare Foot $2,001.00 to $25,000.00 Each Addl. $1,000 or fraction $18 Increase by 3.53% CPI Projects Valued at $25,000 Base $831 Construction Valuation - Cost per Sqare Foot $25,001.00 to $50,000.00 Each Addl. $1,000 or fraction $33 Increase by 3.53% CPI Projects Valued at $50,000 Base $1,656 Construction Valuation - Cost per Sqare Foot $50,001.00 to $100,000.00 Each Addl. $1,000 or fraction $13 Construction Valuation - Cost per Sqare Foot Projects Valued at $100,000 Base $2,306 Construction Valuation - Cost per Sqare Foot $100,001.00 to $500,000.00 Each Addl. $1,000 or fraction $11 No Change Projects Valued at $500,000 Base $6,706 Construction Valuation - Cost per Sqare Foot $500,001.00 to $1,000,000.00 Each Addl. $1,000 or fraction $9 Construction Valuation - Cost per Sqare Foot Projects Valued at $1,000,000 Base $11,206 Construction Valuation - Cost per Sqare Foot $1,000,001.00 to $10,000,000 Each Addl. $1,000 or fraction $4 Construction Valuation - Cost per Sqare Foot Projects Valued at $10,000,000 Base $42,706 Construction Valuation - Cost per Sqare Foot $10,000,001.00 to $50,000,000 Each Addl. $1,000 or fraction $3 No Change Projects Valued at $50,000,000 Base $162,706 Construction Valuation - Cost per Sqare Foot $50,000,001 to $100,000,000 Each Addl. $1,000 or fraction $3 No Change Projects Valued at $100,000,000 Base $312,706 Construction Valuation - Cost per Sqare Foot $100,000,000+ Each Addl. $1,000 or fraction $3 Construction Valuation - Cost per Sqare Foot Permit Valuation shall be set as required in Section 109.3 of the California Buildign Code as adopted and amended by the City of San Ramon.

Building Plan Check Fees
Plan Check Fee % of Building Permit 55% No Change
Disabled Access Plan Check % of Plan Check Fee 25% No Change Energy Plan Check % of Plan Check Fee 25% No Change
Additional Fees
Permit Issuance Fee Per Permit $87 Increase by 3.53% CPI Disable Access Inspection % of Building Permit Fee 25% No Change

BUILDING & SAFETY FEES

5. The State Department of Fish & Game and Contra Costa County require filing fees (AB 3158) at the time of project approval.

6. School Age Child Care Fees, Park and Recreational Facility Impact Fee, and Open Space Impact Fee will be adjusted annually using the Engineering News Record - San Francisco Bay Area Construction Cost Index, not to exceed the cap in the Keyser Marston

7. Refer to the Inclusionary Housing and Affordable Housing Commercial Linkage Fee Ordinance for on-site construction requirements. The review authority may also consider an applicable alternative means of compliance or

Page 8 of 41 ends

9.2.b
Packet Pg. 181 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Energy Inspection % of Building Permit Fee 25% No Change Plan Duplication Affidavit Fee Per Plan $87 Increase by 3.53% CPI Technology Surcharge* % of Permit Fee 4.6% No Change
* Only assessed on Development-related applications, and does not include any impact fees.

Temporary Certificate of Occupancy
TCO Bond Per Sq. Ft. $2 No Change - Admin Fee Bond
TCO Administration Fee % of Cash Bond 5% No Change - Admin Fee Bond Review and approve the waste management plan and summary report for all projects with a construction value over $75,000 and all demolition projects Each $457 Council Dierection and Increase by 3.53% CPI Re-Inspection Fee Assessed When the Work for a Scheduled Inspection is Not Ready to be Inspected
Each $147 Increase by 3.53% CPI
Inspections for which no fee specifically indicated Per Hour $207 Increase by 3.53% CPI Additional Plan Review Required by Changes, Additions or Revisions Per Hour $229 Increase by 3.53% CPI Restore Service – A Permit to restore electric utility service (shut-off because of vacancy, fire, or official act), not inclusive of fees for work requiring additional permits
Each Utility $190 Increase by 3.53% CPI
Demolition Permit Each $104 Increase by 3.53% CPI
Swimming Pool Permit Valuation Valuation-Based No change Flat Fees
Solar Heating and Cooling System
Residential:
10kWth or less Each $551 Increase by 3.53% CPI
Per Addl kWth Per kWth $18 Increase by 3.53% CPI
Commercial:
30kWth or less Each $1,124 Increase by 3.53% CPI
31-260 kWth Per kWth $10 Increase by 3.53% CPI
260+ kWth Per kWth $7 Increase by 3.53% CPI
Photovoltaic (PV) Installation
Residential:
10kWth or less Each $551 Increase by 3.53% CPI
Per Addl kWth Per kWth $17 Increase by 3.53% CPI
SolarAPP+ Permit Designs Each $450 No Change - State Guided Fee Commercial:
30kWth or less Each $1,228 Increase by 3.53% CPI
31-260 kWth Per kWth $8 Increase by 3.53% CPI
260+ kWth* Per kWth $5 Increase by 3.53% CPI
*plus additional building permit fee for ground-built support structure Residential Solar Energy Storage (Battery)

Page 9 of 41 ends

9.2.b
Packet Pg. 182 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
First Battery Each $385 Increase by 3.53% CPI
Each Additional Battery Each $34 Increase by 3.53% CPI
Miscellaneous Permit Fee
Remodels:

Bathroom Remodel or Repair (w/o structural modification) Each $759 Increase by 3.53% CPI Kitchen Remodel or Repair (w/o structural modification) Each $759 Increase by 3.53% CPI Re-roof
Up to 10x10 ft. Base $155 Increase by 3.53% CPI
Each Additional 10x10 Ft Each $18 Increase by 3.53% CPI Window/Door Permit (w/o structural modification)
First 4 Windows and 1 Door Base $270 Increase by 3.53% CPI Each Additional Window Each $18 Increase by 3.53% CPI
Each Additional Door Each $18 Increase by 3.53% CPI
Special Inspection
Administration of Special Inspection – When required by construction type or special conditions by the Chief Building Official % of Building Permit 10% No Change Code Compliance Investigation Each $259 Increase by 3.53% CPI Investigation Reports – Minimum Per Hour $207 Increase by 3.53% CPI Investigation Reports – With Photos Each $312 Increase by 3.53% CPI Investigation Fee – Work Without Permit* Violation Equal to Permit Fee No Change - Council Direction Weekly Building Permit Activity Reports
Annual Each $174 Increase by 3.53% CPI
Per Request Each $29 Increase by 3.53% CPI
Overtime
Weekends (4 hr min) Per Hour $247 Increase by 3.53% CPI Holidays (4 hr min) Per Hour $287 Increase by 3.53% CPI During Regular Business Week Per Hour $247 Increase by 3.53% CPI Other Fees
Electric Vehicle Charging Station Per kWh $.39 kWh - $2.00 kWh No Change - Variable Based on Station Code Enforcement
First Notice / Inspection Each Courtesy (No Fee) No Change Subsequent Notices / Inspections Per Hour $415 Council Dierection and Increase by 3.53% CPI Photograph Processing Actual Cost Actual Cost + 15% Admin Fee No Change - Actual Cost Mileage Per Mile $0.67/mile + 15% Admin Fee No Change - Mileage Rate + Admin Fee Extension Fee Each $135 Increase by 3.53% CPI
*This provision does not apply to emergency work if the Chief Building Official determines that such work was urgent and necessary as well as

Page 10 of 41 ends

9.2.b
Packet Pg. 183 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Posting Fee Each $101 Increase by 3.53% CPI
Administrative Hearing Each $726 Council Dierection and Increase by 3.53% CPI Title Search Fee Actual Cost Actual Cost + 15% Admin Fee No change as Actual Cost Declaration of Substandard and/or Public Nuisance Notice Each $829 Increase by 3.53% CPI Removal of Declaration Each $726 Council Dierection and Increase by 3.53% CPI Vehicle Abatement (Removal) Actual Cost Actual Cost + 15% Admin Fee No Change - Actual Cost Abatement (Cleanup) Cost Actual Cost Actual Cost + 15% Admin Fee No Change - Actual Cost Preparation of Job Specifications Each $622 Increase by 3.53% CPI City Council Approval of Contract Each $207 Increase by 3.53% CPI Contract Performance Inspection Each $207 Increase by 3.53% CPI Billing Each $104 Increase by 3.53% CPI
Record Special Assessment Each $104 Increase by 3.53% CPI Filing a Special Assessment Each $207 Increase by 3.53% CPI Administrative Costs Pertaining to Violations of the Sign Ordinance Per Sign $21 Council Dierection and Increase by 3.53% CPI Fines for Other City Building Violations
First Violation Ordinance and Building Code Not to Exceed $100 No Change - Municipal Code Second Violation (Within one [1] year) Not to Exceed $200 No Change - Municipal Code Each Additional Violation (Same Ordinance within one [1] year) Not to Exceed $500 No Change - Municipal Code Second Building Code Violation Each $500 No Change - Municipal Code Third Building Code Violation Each $1,000 No Change - Municipal Code

ELECTRIC PERMIT
Minimum Fee Minimum $155 Council Dierection and Increase by 3.53% CPI Electrical Service Each $155 Increase by 3.53% CPI
Additional sub-feeders and distribution power panels Per $52 Increase by 3.53% CPI Miscellaneous Permit Fee Base $207 Council Dierection and Increase by 3.53% CPI Miscellaneous Permit Fee % of Contract Cost 2% No Change Electric Plan Check Fee % of Electric Permit Fee 65% No Change Residential Dwellings % of Building Permit Fee 20% No Change In-Ground Swimming Pool, Spas, and Hot Tubs Each $312 Council Dierection and Increase by 3.53% CPI In-Ground Swimming Pool, Spas, and Hot Tubs Plan Check % of Building Permit Fee 30% No Change Above-Ground Swimming Pool, Spas and Hot Tubs Each $207 Council Dierection and Increase by 3.53% CPI Electric Power Distribution Poles
Temporary Electrical Service Each $155 Increase by 3.53% CPI Additional sub-feeders and distribution power panels Each $52 Increase by 3.53% CPI Furnace/Air Conditioning

Page 11 of 41 ends

9.2.b
Packet Pg. 184 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Residential Each $155 Increase by 3.53% CPI
Commercial Minimum $312 Council Dierection and Increase by 3.53% CPI Low Voltage, Protective, Security Signal and Communications Circuits % of Building Permit Fee 3% No Change Electric Signs and Outline Lighting Minimum $155 Council Dierection and Increase by 3.53% CPI Commercial or Industrial
Office / Light Industrial % of Building Permit Fee 15% No Change Retail Sales % of Building Permit Fee 20% No Change
Food Markets % of Building Permit Fee 30% No Change
Heavy Industrial % of Building Permit Fee 30% No Change Restaurants % of Building Permit Fee 35% No Change
Other % of Building Permit Fee 35% No Change

PLUMBING PERMIT
Minimum Fee Minimum $155 Council Dierection and Increase by 3.53% CPI Miscellaneous Permit Fee Each $155 Increase by 3.53% CPI Miscellaneous Permit Fee % of Contract Cost 2% No Change Residential Dwellings % of Building Permit Fee 15% No Change Swimming Pools % of Building Permit Fee 10% No Change
Furnance/Air Conditioning
Residential Each $155 Increase by 3.53% CPI
Commercial % of Building Permit Fee 15% No Change
Commercial or Industrial
Office % of Building Permit Fee 10% No Change
Retail Sales % of Building Permit Fee 10% No Change
Food Markets % of Building Permit Fee 10% No Change
Industrial % of Building Permit Fee 10% No Change
Restaurants % of Building Permit Fee 15% No Change
Other % of Building Permit Fee 15% No Change
Heat Pump Water Heaters Each $155 Increase by 3.53% CPI Water Heaters Each $155 Increase by 3.53% CPI
Plumbing Plan Check Fee % of Plumbing Permit $1 No Change

MECHANICAL PERMIT
Minimum Fee Minimum $155 Council Dierection and Increase by 3.53% CPI Miscellaneous Permit Fee Each $155 Increase by 3.53% CPI Miscellaneous Permit Fee % of Contract Cost 2% No Change Residential Furnace/Air Conditioning (replace in-kind) Each $213 Increase by 3.53% CPI Residential Dwellings % of Building Permit Fee 15% No Change Swimming Pools % of Building Permit Fee 10% No Change
Furnance/Air Conditioning
Residential Each $155 Increase by 3.53% CPI

Page 12 of 41 ends

9.2.b
Packet Pg. 185 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Commercial % of Building Permit Fee 15% No Change
Commercial or Industrial
Office % of Building Permit Fee 10% No Change
Retail Sales % of Building Permit Fee 10% No Change
Food Markets % of Building Permit Fee 10% No Change
Industrial % of Building Permit Fee 10% No Change
Restaurants % of Building Permit Fee 15% No Change
Other % of Building Permit Fee 15% No Change
Mechanical Plan Check Fee % of Mechanical Permit Fee 65% No Change

ENGINEERING FEES
Routine Building Permit Reviews
Data Collection Processing Per Hour (2 hr Min.) $259 Increase by 3.53% CPI Inspection Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Non-Routine Building Permit Reviews
Initial Deposit Deposit Range $500 - $10,000 No Change - Deposit Range Hourly Review Per Hour $259 Increase by 3.53% CPI
Special Projects
Minimum Fee Each $3,238 Increase by 3.53% CPI
Hourly Review Per Hour $259 Increase by 3.53% CPI
Consultant Review Actual Cost
Consultant Cost + Admin
Fee No Change - Actual Cost
Inspection Fee Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Overtime Inspections:

During Regular Business Week Per Hour $290 Increase by 3.53% CPI During Weekends Per Hour (3 hr. Min) $290 Increase by 3.53% CPI During Holidays Per Hour (3 hr. Min) $335 Increase by 3.53% CPI Fee Notes
The DV GHAD and NWSR GHAD fees and charges shall be the same as those established by the City of San Ramon for all similar services except as otherwise detailed in this Schedule of Fee and Charges.

A plan checking and inspection fee will be assessed for all projects that require plan reviews and/or inspections related to DV GHAD or NWSR GHAD facilities, including toe-drains and subdrains. This fee shall apply to all retaining wall and swimming pools, new building and building additions and any projects that require a grading permit and impact DV GHAD or NWSR GHAD facilities. It may also apply to other projects that involve earthwork, trenching or construction of below ground elements that potentially impact DV GHAD or NWSR GHAD facilities.

Non-routine projects that require in excess of four (4) hours of staff time (two [2] hours staff review + two [2] hours inspection) may be assessed charges based on the actual staff time required to review the project. The deposit amount collected is subject to the discretion of the District Engineer.

For all parcels within the DV GHAD and NWSR GHAD, the Routine and Non-Routine Building Permit Review fees shall be in lieu of the Public Works Engineering Services Division Building Review Fee.

DV GHAD and NWSR GHAD Fees

Page 13 of 41 ends

9.2.b
Packet Pg. 186 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Drainage Permit Application Fee
Routine Projects (Processing & Filing) Per Hour (2 hr Min.) $259 Increase by 3.53% CPI Special Projects (Processing & Filing)
Initial Deposit Deposit Range $500 - $10,000 No Change - Deposit Range Site Development
Plan Check Fee
$0 - $250,000 % of Improvement 3.10% No Change
$250,000-$1,000,000 % of Improvement 3.20% No Change
$1,000,000+ % of Improvement 2.40% No Change
Consultant Review Actual Cost onsultant Cost + Admin Fee No Change - Actual Cost Inspection Fee During Regular Business Week
$0 - $250,000 % of Improvement 5.80% No Change
$250,000-$1,000,000 % of Improvement 6.70% No Change
$1,000,000+ % of Improvement 5.60% No Change
Overtime Inspection Fee During Weekends Per Hour (3 hr. Min) $290 Increase by 3.53% CPI Overtime Inspection Fee During Holidays Per Hour (3 hr. Min) $335 Increase by 3.53% CPI Building Permit Review Fees:

Routine Building Permit Reviews
Data Collection Processing Per Hour (2 hr Min.) $259 Increase by 3.53% CPI Inspection Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Non-Routine Building Permit Reviews
Initial Deposit Deposit Range $500 - $10,000 No change - Deposit Range Hourly Review Per Hour $259 Increase by 3.53% CPI
Special Projects
Minimum Fee Each $3,238 Increase by 3.53% CPI
Hourly Review Per Hour $259 Increase by 3.53% CPI
A Site Development Permit shall be required for the plan check and inspection of all construction sites, improvements of non-residential and residential developments, including grading and The Site Development Permit shall serve as a grading permit, an erosion and sedimentation control permit, parking lot construction permit, and encroachment permit for curb gutter, driveway A building permit review fee will be required for all building permit applications requiring Engineering review, and will be collected by the Building Division at the time of application submittal.

Building Permit Reviews within the DV GHAD or NWSR GHAD will be charged the applicable DV GHAD and NWSR GHAD Building Permit Review fees.

Special projects including Annexation Agreements, Engineers Report, Revisions to the Plan of Control and Request for Other Services will be assessed a minimum fee of $1,000.00 plus per hour rate for additional staff hours in excess of the minimum fee based on actual staff time required to review the project. The consultant fees will be the actual of the consultant services plus an administrative fee.

ENGINEERING FEES

Page 14 of 41 ends

9.2.b
Packet Pg. 187 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Consultant Review Actual Cost
Consultant Cost + Admin
Fee No Change - Actual Cost
Inspection Fee Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Overtime Inspections:

During Regular Business Week Per Hour $290 Increase by 3.53% CPI During Weekends Per Hour (3 hr. Min) $290 Increase by 3.53% CPI During Holidays Per Hour (3 hr. Min) $335 Increase by 3.53% CPI Initial Deposit Deposit Range $500 - $10,000 No Change - Deposit Range Encroachment Permits
Hauling and Oversize Loads
Single Trip Each $16 No Change - State Set
Annual Trip Each $90 No Change - State Set
Permit Application & Filing Fee:

Routine, which include Curb, Gutter, Sidewalks, PODs, and Cross Drains Per Hour (1 hr Min.) $259 Increase by 3.53% CPI
Non-Routine Projects Per Hour (3 hr. Min) $259 Increase by 3.53% CPI Permit Inspection Fee:

Routine Projects Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Non-Routine Projects Per Hour (3 hr. Min) $245 Increase by 3.53% CPI Stormwater Quality Device (C.3) Inspection Per Hour (2 hr Min.) $245 Increase by 3.53% CPI Permit Application, Filing, Inspection, and Review Fee – Special Projects
Initial Deposit Deposit Range $500 - $25,000 No Change - Deposit Range Hourly Review Per Hour $259 Increase by 3.53% CPI
Overtime Inspection Fee During Regular Business Week Per Hour $290 Increase by 3.53% CPI Overtime Inspection Fee During Weekends Per Hour (3 hr. Min) $290 Increase by 3.53% CPI Overtime Inspection Fee During Holidays Per Hour (3 hr. Min) $335 Increase by 3.53% CPI Subdivision / Preliminary Development Review
Preliminary Development Review Fee
Plans / Studies Awaiting Entitlement - Initial Deposit Deposit $3,500 No Change - Deposit Mixed Use Development Projects - Initial Deposit Deposit $4,000 No Change - Deposit Hourly Review Per Hour $259 Increase by 3.53% CPI
Routine Projects Per Hour (2 hr Min.) $259 Increase by 3.53% CPI Utility Per Hour (3 hr. Min) $259 Increase by 3.53% CPI Day Care/Learning Center of 14 or Fewer Kids Per Hour (1.5 hr Min.) $259 Increase by 3.53% CPI Day Care/Learning Center of 15 or More Kids:

Initial Deposit Deposit $1,500 No Change - Deposit
Hourly Review Per Hour $259 Increase by 3.53% CPI
Minor Subdivisions

Page 15 of 41 ends

9.2.b
Packet Pg. 188 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Initial Deposit Deposit $3,000 No Change - Deposit
Consultant Review Actual Cost Consultant + Admin Fee No Change - Actual Cost Major Subdivisions
Initial Deposit Deposit $4,000 No Change - Deposit
Per Lot Per Lot $324 Increase by 3.53% CPI
Consultant Review Actual Cost Consultant + Admin Fee No Change - Actual Cost Monument Checking Fee – Any error found in placement, course or identification of survey monuments shall require payment of fee as indicated
Actual Cost Consultant + Admin Fee No Change - Actual Cost Tentative Map Technical Review Fee
Initial Deposit Deposit $3,000 No Change - Deposit
Hourly Review Per Hour $259 Increase by 3.53% CPI
Single Parcel Plan Review Fee Per Parcel $130 Increase by 3.53% CPI Certificates of Compliance, Property Mergers, Parcel Map Waivers & Lot Line Adjustments
Parcel Review Per Parcel $389 Increase by 3.53% CPI
Hourly Review Per Hour $259 Increase by 3.53% CPI
Street Vacations
Initial Deposit Deposit $518 Council Direction AND Rounded for Deposit Hourly Review Per Hour $259 Increase by 3.53% CPI
Bonds, Letters of Credit and Deposits for Improvements
Improvement Bond % of Improvement 100% No change - Bond Fee Administrative Fee Each $518 Increase by 3.53% CPI
Base Map Revision Fee (Applicable at filing of Final Map, Parcel Map or Lot Line Adjustment)
County Fee Each County Fee No change - County Fee
Administrative Fee Each County Fee No change - County Fee Other Fees
Appeals Each $648 Increase by 3.53% CPI
Peer Review of Special Studies Actual Cost Consultant + Admin Fee No Change - Actual Cost Technology Surcharge % of Permit Fee 4.60% No Change
Engineering Research
Engineering Drawings, Reports, Letters, and Miscellaneous Per Hour (0.5 hr Min.) $259 Increase by 3.53% CPI Flood Zone Research
Lot Research Per Lot $86 Increase by 3.53% CPI
Hourly Review Per Hour $259 Increase by 3.53% CPI

CREEK STUDY AND DRAINAGE MITIGATION

Page 16 of 41 ends

9.2.b
Packet Pg. 189 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Twin Creeks Watershed Per Developable Acre $3,106 Increase by 3.53% CPI South San Ramon Creek (Main Stem) Per Developable Acre $1,553 Increase by 3.53% CPI Oak Creek Watershed Per Developable Acre $1,812 Increase by 3.53% CPI Drainage Mitigation Fee Per SF of Site Impervious Surfa $0.31 Increase by 3.53% CPI

TRAFFIC MITIGATION FEES
Residential:

Single-Family Residential:

Less than 1,000 SF Per Dwelling Unit $3,537 Decrease by 0.7% CCI 1,000 - 1,499 SF Per Dwelling Unit $3,835 Decrease by 0.7% CCI 1,500 - 1,999 SF Per Dwelling Unit $4,005 Decrease by 0.7% CCI 2,000 - 2,499 SF Per Dwelling Unit $4,134 Decrease by 0.7% CCI 2,500 - 2,999 SF Per Dwelling Unit $4,261 Decrease by 0.7% CCI 3,000 - 3,999 SF Per Dwelling Unit $4,389 Decrease by 0.7% CCI 4,000 SF or Greater Per Dwelling Unit $4,432 Decrease by 0.7% CCI Apartment, Townhome, Condo Per Dwelling Unit $2,312 Decrease by 0.7% CCI Other Per P.M. Peak Hour Trip $4,862 Decrease by 0.7% CCI Non-Residential:

Retail Per 1,000 SF $8,366 Decrease by 0.7% CCI
Office Per 1,000 SF $10,498 Decrease by 0.7% CCI
Service Commercial Per 1,000 SF $4,881 Decrease by 0.7% CCI Other Non-Residential Per 1,000 SF $4,862 Decrease by 0.7% CCI Tassajara Area Benefit Fee Per Dwelling Unit $13,651 Decrease by 0.7% CCI Southern Contra Costa JEPA Traffic Mitigation Fee
Contra Costa Sub-Regional Fee
Single / Multi-Family Residential Each $5,327 Decrease by 0.7% CCI Apartment, Townhome, Condo Per Dwelling Unit $5,327 Decrease by 0.7% CCI Office Per SF $8 Decrease by 0.7% CCI
Commercial Retail Per SF $5 Decrease by 0.7% CCI
Other Each $5,273 Decrease by 0.7% CCI
Southern Contra Costa Regional Fees
Single / Multi-Family Residential Each $1,906 Decrease by 0.7% CCI Industrial Per SF $5 Decrease by 0.7% CCI
Other Per Avg Peak Hour Trip $6,609 Decrease by 0.7% CCI Accessory Dwelling Unit Per Dwelling Unit $0 No Change

Page 17 of 41 ends

9.2.b
Packet Pg. 190 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Affordable Housing Per Dwelling Unit $0 No Change
Tri-Valley Transportation Development Fees
Single Family Residential Per Dwelling Unit $7,146 Decrease by 0.7% CCI Multi-Family Residential Per Dwelling Unit $4,213 Decrease by 0.7% CCI Office Per SF $10 Decrease by 0.7% CCI
Retail Per SF $6 Decrease by 0.7% CCI
Industrial Per SF $5 Decrease by 0.7% CCI
Other Per Avg Peak Hour Trip $6,609 Decrease by 0.7% CCI Accessory Dwelling Unit Per Dwelling Unit $0 No Change
Affordable Housing Per Dwelling Unit $0 No Change

TRANSPORTATION SERVICES DIVISION
Preliminary Development Review Fee - Day Care / Learning Center Per Hour (1.5 hr Min.) $259 Increase by 3.53% CPI

PUBLIC SERVICES FEES
Administration Per Hour $190 Increase by 3.53% CPI
Field – Regular Per Hour $165 Increase by 3.53% CPI
Field – Overtime Per Hour $197 Increase by 3.53% CPI
Field – Call-Out/Emergency Stand-By (Two (2) Hour Minimum) Per Hour $197 Increase by 3.53% CPI Field - Holiday Per Hour $229 Increase by 3.53% CPI
Commercial Recycling Transporter Permit
Application Per Application $65 No Change - Set by Agreement Renewal Annually $41 No Change - Set by Agreement
Additional Fees & Charges
Extra Garbage Tags & Yard Trimmings Bags1 Each $12 No Change - Set by Agreement Additional Sports Field Mowing/Cricket Pitch Rolling For Enhanced Maintenance
Per Field $247 Increase by 3.53% CPI
Staffing Rates
NOTES:

1. This fee is established by the Franchise Agreement (C2018-070) with Alameda County Industries of San Ramon, Inc. The fee was approved by the City Council on November 21. 2, 2022 by Resolution No. 2022-144.

Page 18 of 41 ends

9.2.b
Packet Pg. 191 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description

POLICE DEPARTMENT
Ink Cards
City Resident per card Each $23 Increase by 3.53% CPI
Non-Resident – first card Each $33 Increase by 3.53% CPI Non-Resident – each additional card Each $33 Increase by 3.53% CPI Livescan*
City Resident Each $34 Increase by 3.53% CPI
Non-Resident Each $44 Increase by 3.53% CPI
Teachers employed by San Ramon Valley Unified School District Each $44 Increase by 3.53% CPI *Additional DOJ, FBI and other fees apply
Records
Police Report Per Page $0.10 No Change - State Set
Police Report - Redacted Per Page $0.10 No Change - State Set Subpoena Duces Tecum / Deposition Subpoenas**
Production of Business Records State Code $15 No Change - State Set Unsworn Employees Per Employee / Day $275 No Change - State Set Sworn Officers Actual Cost Actual Cost No Change - Actual Cost CDs, DVDs, Flash Drives Each $10 No Change - Material Cost **includes the rates plus all reasonable expenses
Driving Under the Influence (DUI)
Admin Fee Each $147 Increase by 3.53% CPI
Sergeant Per Hour $231 Increase by 3.53% CPI
Corporal Per Hour $202 Increase by 3.53% CPI
Officer Per Hour $186 Increase by 3.53% CPI
PST Per Hour $130 Increase by 3.53% CPI
Management Review Fee (Captain) Per Hour $214 Increase by 3.53% CPI Other Fees
Car Seat Inspections
Resident Each $0 Council Direction/Waive Fee to Resident Non-Resident Each $46 Increase by 3.53% CPI
Processing Fee for one (1) Day Liquor License Letter to Alcoholic Beverage Control (ABC) Board
Each $42 Increase by 3.53% CPI
False Alarms
Fingerprinting

Page 19 of 41 ends

9.2.b
Packet Pg. 192 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
(2nd Alarm) Within Permit Year Each $50 No Change - Ordinance Based (3rd Alarm) Within Permit Year Each $150 No Change - Ordinance Based (4th Alarm) Within Permit Year Each $300 No Change - Ordinance Based Any Additional (Above 4th) Within Permit Year Per $300 No Change - Ordinance Based Special Events Staffing − (two [2] hour minimum)
Administrative Fee Per Hour $147 Increase by 3.53% CPI
Sergeant Per Hour $231 Increase by 3.53% CPI
Corporal Per Hour $202 Increase by 3.53% CPI
Officer Per Hour $186 Increase by 3.53% CPI
PST Per Hour $130 Increase by 3.53% CPI
Management Fee Per Hour $214 Increase by 3.53% CPI
Crime Prevention
Site Inspection / Plan Reviews Hourly $147 Increase by 3.53% CPI Bingo / ID Cards
ID Cards Each $16 No Change
Permit Each $25 Increase by 3.53% CPI
Card Room Employee Work Permit
Card Room Application Fee Each $1,496 Increase by 3.53% CPI Card Room Annual Licensing Fee Per Table $10,521 Increase by 3.53% CPI New Work Permit Each $214 Increase by 3.53% CPI
Renewal Work Permit Each $107 Increase by 3.53% CPI
Citation Sign-Off
Resident Each $0 Council Direction/Waive Fee to Resident Non-Resident issued by other Police Department Each $28 Increase by 3.53% CPI Massage Permit Fees
Massage Establishment
New Each $612 Increase by 3.53% CPI
Annual Renewal Each $502 Increase by 3.53% CPI
Massage Therapist (Owner / Operator)
New Each $538 Increase by 3.53% CPI
Annual Renewal Each $502 Increase by 3.53% CPI
Outcall Massage Permit
New Each $612 Increase by 3.53% CPI
Annual Renewal Each $502 Increase by 3.53% CPI
Masseur / Masseuse Permit
New Each $406 Increase by 3.53% CPI
Annual Renewal Each $310 Increase by 3.53% CPI
Taxicab / Passenger Transport Permit Fees
Taxi / Transport Establishment
New Each $612 Increase by 3.53% CPI

Page 20 of 41 ends

9.2.b
Packet Pg. 193 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Annual Renewal Each $502 Increase by 3.53% CPI
Driver Permit − (Owner / Operator)
New Each $612 Increase by 3.53% CPI
Annual Renewal Each $502 Increase by 3.53% CPI
Driver Permit
New Each $406 Increase by 3.53% CPI
Annual Renewal Each $310 Increase by 3.53% CPI
Solicitor Permit Fees Per Permit $296 Increase by 3.53% CPI

VIOLATION AND FINE SCHEDULE
Violation of City Ordinance
Infractions
First Violation Not to Exceed $100 No Change - Ordinance Based Second Violation – (Within one [1] year) Not to Exceed $200 No Change - Ordinance Based Each Additional Violation - (Within one [1] year) Not to Exceed $550 No Change - Ordinance Based Misdemeanor** Not to Exceed $1,000 No Change - Ordinance Based **Not to Exceed Fine and / or imprisoment of 6 months
Animals:

Animal Noise (B2-70) Not to Exceed $100 No Change - Ordinance Based Animal Waste (Public or Private Property) (B2-71) Not to Exceed $100 No Change - Ordinance Based Health & Sanitation
Living in Vehicles (B6-221) Not to Exceed $100 No Change - Ordinance Based Smoking Prohibited (B6-73) Not to Exceed $100 No Change - Ordinance Based Fireworks:

Possession or Ignition of Firecrackers (Excluding Safe/Sane H&S Section 12529) (B4-1)
Not to Exceed $100 No Change - Ordinance Based
Damage to Property
Removal or Destruction Including Shrubbery, Artifacts, or Archaeological Site (B5-30A)
Not to Exceed $100 No Change - Ordinance Based
Break or Deface Any Building, Sign, Fence, Bench, Structure, Apparatus, Equipment, or Property (B5-30B)
Not to Exceed $100 No Change - Ordinance Based
Mark, Print, Write, Sign, Card, Display or Similar Inscription or Device on Public or Private Property (without a permit) (B5-30C)
Not to Exceed $100 No Change - Ordinance Based
Noise Sources
Internal Combustion Engines Causing Excessive Noise Between 8:00PM and 8:00AM (Without a Permit) (B6-99)
Not to Exceed $100 No Change - Ordinance Based
Construction Projects (Unlawful M-F before 7:30 AM and after 7:00 PM; SatSun Prior to 9:00 AM and after 6:00 PM) (B6-100) Not to Exceed $100 No Change - Ordinance Based
City Parks
Violation of Park Hours (B5-11) Each $125 No Change - Ordinance Based

Page 21 of 41 ends

9.2.b
Packet Pg. 194 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Designated Pedestrian Use (B5-13A) Not to Exceed $100 No Change - Ordinance Based Bicycle or Skateboard Hazard (B5-13B) Not to Exceed $100 No Change - Ordinance Based Bicycle in Skate Park (B5-13C) Each $125 No Change - Ordinance Based Skate Park Helmet (B5-13D) Each $75 No Change - Ordinance Based Littering (B5-18) Each $200 No Change - Ordinance Based Sound Amplification Devices (Without a Permit) (B5-28) Not to Exceed $100 No Change - Ordinance Based Curfew (B7-231) Each $125 No Change - Ordinance Based
Vehicle Restrictions within City Parks
Operation on Roads or Trails (Without a Permit) (B5-12A) Not to Exceed $100 No Change - Ordinance Based Excess Speed (B5-12B) Not to Exceed $100 No Change - Ordinance Based Unlicensed Vehicle (B5-12C) Not to Exceed $100 No Change - Ordinance Based Parking in Restricted Area (B5-12D) Not to Exceed $100 No Change - Ordinance Based Parking After Hours (B5-12E) Not to Exceed $100 No Change - Ordinance Based Abandoned Vehicle (B5-12F) Not to Exceed $100 No Change - Ordinance Based Wash, Repair, or Advertise for Sale (B5-12G) Not to Exceed $100 No Change - Ordinance Based Excessive Noise from Muffler or Exhaust System (B5-12H) Not to Exceed $100 No Change - Ordinance Based Public Consumption of Alcoholic Beverages
Prohibition of Public Alcohol Consumption (B7-1) Not to Exceed $100 No Change - Ordinance Based Unlawful Juvenile Gathering on Private Property (Five [5] or more person(s) < 21 year age of where alcohol is in possession or being consumed by person(s) < 21) (B7-12)
Each $1,000 No Change - Ordinance Based
Police Services at parties, gatherings, or events requiring a response: (B7- 13 & B7-14)
Administrative Fee Per Hour $142 No Change - Ordinance Based Sergeant Per Hour $223 No Change - Ordinance Based
Corporal Per Hour $195 No Change - Ordinance Based
Officer Per Hour $180 No Change - Ordinance Based
PST Per Hour $126 No Change - Ordinance Based
Management Fee Per Hour $206 No Change - Ordinance Based False Reports
False Reports to City Employee / Officer (B7-21) Not to Exceed $100 No Change - Ordinance Based Labor Disputes
Obstruction of Public Ways (B7-125) Not to Exceed $100 No Change - Ordinance Based Intimidation - During Picketing Prohibited (B7-126) Not to Exceed $100 No Change - Ordinance Based Intimidation - During Assembly Prohibited (B7-127) Not to Exceed $100 No Change - Ordinance Based Opprobious Language Prohibitied (B7-128) Not to Exceed $100 No Change - Ordinance Based Solicitors / Peddlers
Solicitors / Peddlers (Without a permit) (B7-145) Not to Exceed $300 No Change - Ordinance Based Soliciting on Vehicles (B7-149) Not to Exceed $100 No Change - Ordinance Based Roadside Selling of Vehicle (B6-211) Not to Exceed $100 No Change - Ordinance Based

Page 22 of 41 ends

9.2.b
Packet Pg. 195 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Firearms
Discharge Restrictions (B7-247) Not to Exceed $100 No Change - Ordinance Based Possession of Firearms, Pellet Guns, and Similar Weapons by Minors Not to Exceed $100 No Change - Ordinance Based Graffiti
Graffiti Prohibited on Public or Private Property (B7-254) Not to Exceed $100 No Change - Ordinance Based Skateboard, Bicycle, and Wheeled Devices
Prohibited Use on Public or Private Property (B7-282A) Not to Exceed $100 No Change - Ordinance Based Tricks & Stunts (B7-282B) Not to Exceed $100 No Change - Ordinance Based Unattended Causing Injury Hazard (B7-282C) Not to Exceed $100 No Change - Ordinance Based Parking Restrictions
Stopping, Standing, Parking - Curb Marking (B8-1) Each $50 No Change - Ordinance Based Time Limit Parking (B8-2) Each $50 No Change - Ordinance Based Parking / Stopping - Construction Area (B8-3) Each $50 No Change - Ordinance Based Parking Designated Zones - Private Proeprty (B8-4) Each $50 No Change - Ordinance Based Parking within Marked Spaces (B8-5) Each $50 No Change - Ordinance Based Temporary / Emergency Parking Sign / Barriers (B8-6) Each $75 No Change - Ordinance Based Permit Parking (B8-21) Each $125 No Change - Ordinance Based Parking Oversized Vehicles (B8-31) Each $125 No Change - Ordinance Based Parking in Fire Lane (B8-39) Each $125 No Change - Ordinance Based Parking Truck / Trailer (Exceeding 10,000 lbs) (B8-51) Each $125 No Change - Ordinance Based Class or Program Per Transaction Actual Cost No Change - Actual Cost Facility Rentals
Transaction Fee Per Transaction Actual Cost No Change - Actual Cost Rental Date Change Fee Per Change $125 No Change
Permit Modification Fee (14 Days or Less prior to Event Date) Per Change $100 New Fee Added in FY25-26 Additional Use Request to Quarterly Permit Per Change $25 New Fee Added in FY25-26 - Fee is only assessed after the set Addit Cancellation (not to exceed $200) Per Transaction $25 or 25% Fee is only assessed after the set Cancellation Request deadline or Late Payment Fee (For Quarterly Use Permits) - (not to exceed $500) % of Rental Fee 5% No Change Facility Deposits
Small Room Deposit $125 No Change
Artist Studio, Sound Studio Deposit $125 No Change
Medium Room Deposit $250 No Change
Large Room Deposit $500 No Change
Grand Room
Weekday: Monday-Thursday Deposit $500 No Change
CoSponsored Group Rentals for Fields, Gyms, and Pools

PARKS AND COMMUNITY SERVICES FEE SCHEDULE
Transaction Fee

Page 23 of 41 ends

9.2.b
Packet Pg. 196 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Weekend: Friday-Sunday Deposit $1,000 No Change
Kitchen Deposit $100 No Change
Dougherty Valley Performing Arts Center Deposit $800 No Change Front Row Theater Deposit $400 No Change
Glass House & Walnut Barn Deposit $1,000 No Change
Aquatic Group Picnic Deposit $100 No Change
Gymnasium Deposit $500 No Change
Facility Cancellation Fees
Small / Medium:
30 days or Less % of Rental Fee 100% No Change
31-60 days % of Rental Fee 75% No Change
61-89 days % of Rental Fee 50% No Change
90+ days % of Rental Fee 0% No Change
Recreation Guide and Playbill Advertising Fees
Business Card
General:

One Issue $145 No Change
Two Issues 20% Off $232 No Change
Three Issues 20% Off $349 No Change
Four Issues 20% Off $464 No Change
Non-Profit:

One Issue $117 No Change
Two Issues 20% Off $186 No Change
Three Issues 20% Off $278 No Change
Four Issues 20% Off $372 No Change
One-eighth (⅛) Page
General:

One Issue $182 No Change
Two Issues 20% Off $290 No Change
Three Issues 20% Off $436 No Change
Four Issues 20% Off $581 No Change
Non-Profit:

One Issue $145 No Change
Two Issues 20% Off $232 No Change
Three Issues 20% Off $349 No Change
Four Issues 20% Off $523 No Change
One-quarter (¼) Page
General:

One Issue $290 No Change
Advertising Fees

Page 2 ends

4 of 41

9.2.b
Packet Pg. 197 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
General:

One Issue $327 No Change
Two Issues 20% Off $523 No Change
Three Issues 20% Off $784 No Change
Four Issues 20% Off $1,045 No Change
Non-Profit:

One Issue $262 No Change
Two Issues 20% Off $419 No Change
Three Issues 20% Off $627 No Change
Four Issues 20% Off $836 No Change
One-half (½) Page
General:

One Issue $617 No Change
Two Issues 20% Off $998 No Change
Three Issues 20% Off $1,400 No Change
Four Issues 20% Off $1,975 No Change
Non-Profit:

One Issue $494 No Change
Two Issues 20% Off $790 No Change
Three Issues 20% Off $1,186 No Change
Four Issues 20% Off $1,581 No Change
Full Page
General:

One Issue $1,234 No Change
Two Issues 20% Off $1,975 No Change
Three Issues 20% Off $2,962 No Change
Four Issues 20% Off $3,949 No Change
Non-Profit:

One Issue $988 No Change
Two Issues 20% Off $1,581 No Change
Three Issues 20% Off $2,369 No Change
Four Issues 20% Off $3,159 No Change
Inside Back Cover
General:

One Issue $1,452 No Change
Two Issues 20% Off $2,323 No Change
Three Issues 20% Off $3,485 No Change
Four Issues 20% Off $4,646 No Change
Non-Profit:

One Issue $1,452 No Change

Page 2 ends

5 of 41

9.2.b
Packet Pg. 198 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Two Issues 20% Off $2,323 No Change
Three Issues 20% Off $3,485 No Change
Four Issues 20% Off $4,646 No Change
General Advertising
Curtain Call $88 No Change
Business Card
One Issue $138 No Change
Two Issues 20% Off $372 No Change
Three Issues 20% Off $152 No Change
Four Issues 20% Off $409 No Change
One-eighth (⅛) Page
One Issue $145 No Change
Two Issues 20% Off $393 No Change
Three Issues 20% Off $160 No Change
Four Issues 20% Off $431 No Change
One-quarter (¼) Page
One Issue $220 No Change
Two Issues 20% Off $594 No Change
Three Issues 20% Off $242 No Change
Four Issues 20% Off $653 No Change
One-half (½) Page
One Issue $440 No Change
Two Issues 20% Off $1,188 No Change
Three Issues 20% Off $484 No Change
Four Issues 20% Off $1,307 No Change
Full Page
One Issue $880 No Change
Two Issues 20% Off $2,376 No Change
Three Issues 20% Off $968 No Change
Four Issues 20% Off $2,614 No Change
Four-Color Glossy Rates
One-quarter (¼) Page $414 No Change
One-half (½) Page $688 No Change
Full Page $1,375 No Change
Performing Arts Brochure
One-half (1/2) Page $220 No Change
Full Page $440 No Change
Performing Arts Marketing Package Per Package $500 New Fee Added in FY 25-26 Special Event Permit Application
Special Events Permit Application, Photo Film Fees And Gallery Fees

Page 26 of 41 ends

9.2.b
Packet Pg. 199 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Tier III and/or payment of a fee is required by Ordinance No. 231 as outlined in the Municipal Code under Division B1 AMUSEMENTS Chapter IV Sections B1 – 121
Per Application $2,268
Consultant's phased fee approach.Consultant proposed to realize to full amount of $3,101. PCS Commission requests to stagger over next 3 FYs: $2268, $2685, $3101
Tier II Per Application $747 Consultant's phased fee approach.Consultant proposed to realize t Tier I Per Application $327 Consultant's phased fee approach.Consultant proposed to realize t Private Fitness Programs Special Permit Fee Application Per Application $25 No Change Outdoor Fitness Permit (Resident) Per Hour $21 No Change Outdoor Fitness Permit (Non-Resident) Per Hour $35 No Change Additional Staff Time (two hour increments)
Building Attendant II Per Hour $24 No Change
Recreation Technician Per Hour $85 No Change
Recreation Coordinator Per Hour $111 No Change
Commercial Film Fees
Commercial Feature Film / Television Productions / Television Commercials / Industrial Film / Video / Photography Production Fee Per Day $1,100 No Change Non-Profit Film / Video / Documentary Per Day $550 No Change Photography and Event Video Fees
Professional Royalty Free Licensing Fee/Annual Per Year $220 No Change Professional Royalty Free Licensing Fee/Day Per Day $55 No Change Rights Managed Independent Fee Per Day $550 No Change
Resident Per Hour $100 No Change
Non-Resident Per Hour $125 No Change
Pushcart Food Vendor Fees
Application Fee - Single Day Each $55 No Change
Application Fee - Two Day Weekend Permit Each $100 No Change Gallery Fees*
Lindsay Dirkx Brown Gallery Exhibit Fee Per Month $55 No Change Special Event Lifeguard Fees (Guard Fee)
Lifeguard Fees (Guard Fee) Per Month $23.5 Increase in fee due to increase in minimum wage and personnel cos Processing Fee Per Application $928 No Change
Installation/Removal Fee Per Banner $90 No Change
Pole Rental Fee Per Pole $16 No Change
Low Resolution JPEG via email (72 dpi) Per Image $5 No Change Medium Resolution JPEG via email (150 dpi) Per Image $10 No Change High Resolution JPEG via email (300 dpi) Per Image $15 No Change Copy of VHS cassette or DVD Per Copy $25 No Change
Banner Permit Application Fees
Commercial Fees For Duplication Of Historic Media Materials & Memorial Program Fees Commercial Fees For Duplication Of Historic Media Materials Glass House Interior Photography Fee (Minimum 2 hours)

Page 27 of 41 ends

9.2.b
Packet Pg. 200 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Copy of recording on CD Per CD $20 No Change
Memorial Program Fees1
Memorial Plaque Purchase for Existing Tree Per plaque $2,000 No Fee changes in approx 10 Years. Increase to cover costs of plaq Memorial Tile 4” x 8” Per Tile $350 No Change
Memorial Benches without Concrete Slab Per Bench $3,500 No Fee changes in approx 10 Years. Increase to cover costs of ben Memorial Benches with Concrete Slab Per Bench $5,000 No Fee changes in approx 10 Years. Increase to cover costs of ben Glass House Brides Room & Outdoor Venue –
Resident & Non-Profit
Per Hour $205 No Change
Glass House Brides Room & Outdoor Venue – Private Non-Resident / Commercial
Per Hour $255 No Change
Per Hour Per Hour $70 No Change
Per 4 Hours Per 4 Hours $249 No Change
Fountain Room
Room Set Up Per Event $78 Increase by 3.53% CPI
Non-Profit:

Weekday Per Hour $73 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $151 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $145 Increase by 3.53% CPI
Weekend Per Hour $301 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $182 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $377 Non-Resident/Commercial Rate = Resident Rate plus 25% Ridgeview Room
Room Set Up Per Event $78 Increase by 3.53% CPI
Non-Profit:

Weekday Per Hour $65 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $144 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $129 Increase by 3.53% CPI
Weekend Per Hour $288 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $162 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $360 Non-Resident/Commercial Rate = Resident Rate plus 25% Bella Vista Room
Room Set Up Per Event $52 Increase by 3.53% CPI
Glass House Brides Room and Outdoor Venue Rentals
Walnut Barn Picnic Rentals:

Building Rentals
NOTES1: Fees for additional memorial items shall be based upon the cost to the City for providing such services including direct cost of item, staff time, and maintenance costs

Page 28 of 41 ends

9.2.b
Packet Pg. 201 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Non-Profit:

Weekday Per Hour $56 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $89 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $112 Increase by 3.53% CPI
Weekend Per Hour $177 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $140 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $222 Non-Resident/Commercial Rate = Resident Rate plus 25% Non-Profit:

Weekday Per Hour $46 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $78 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $92 Increase by 3.53% CPI
Weekend Per Hour $155 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $115 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $194 Non-Resident/Commercial Rate = Resident Rate plus 25% Russell Room
Non-Profit:

Weekday Per Hour $43 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $59 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $85 Increase by 3.53% CPI
Weekend Per Hour $117 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $107 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $147 Non-Resident/Commercial Rate = Resident Rate plus 25% Bella Vista A or B / Vista Grande A or B/ Gardenview/ Music Room / Art Studio 1/ Art Studio 2 / SROP Classroom A &B
Non-Profit:

Weekday Per Hour $35 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $51 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $70 Increase by 3.53% CPI
Weekend Per Hour $102 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $88 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $128 Non-Resident/Commercial Rate = Resident Rate plus 25% Terrace Room/ Vista Grande Room/Art Studio 1&2/SRL Meeting Room

Page 29 of 41 ends

9.2.b
Packet Pg. 202 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Rooms 101, 102, 112A, 112B, 113, 114, 115, 204, 206, Community Room 2, PCS Conference Room, Community Room 1, SROP Classroom A or B* Non-Profit:

Weekday Per Hour $24 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $38 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $48 Increase by 3.53% CPI
Weekend Per Hour $75 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $60 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $94 Non-Resident/Commercial Rate = Resident Rate plus 25% Notes:

Dance Studio
Non-Profit:

Weekday Per Hour $24 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $38 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $48 Increase by 3.53% CPI
Weekend Per Hour $75 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $60 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $94 Non-Resident/Commercial Rate = Resident Rate plus 25% Kitchen (Kitchen rented in conjunctions with a Grand or Large Room) Non-Profit:

Weekday Per Hour $13 Non-Profit Rate = Resident Rate minus 50% Weekend Per Hour $13 Non-Profit Rate = Resident Rate minus 50% Resident:

Weekday Per Hour $25 Increase by 3.53% CPI
Weekend Per Hour $25 Increase by 3.53% CPI
Private Non-Resident or Commercial:

Weekday Per Hour $32 Non-Resident/Commercial Rate = Resident Rate plus 25% Weekend Per Hour $32 Non-Resident/Commercial Rate = Resident Rate plus 25% Kitchen Only
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Hour $85 Increase by 3.53% CPI
Weekend Per Hour $85 Increase by 3.53% CPI
Rose Garden**, Terrace Room Patio Area***, Ridgeview Room Patio Area****, Bella Vista Room Patio Area
*SROP Classroom A or B can only be rented while the pool is open to the public.

Page 30 of 41 ends

9.2.b
Packet Pg. 203 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Hour $33 Increase by 3.53% CPI
Weekend Per Hour $33 Increase by 3.53% CPI
Rental Storage Fee
Non-Profit / Resident / Private Non-Resident or Commercial:

Weekday Per Day $100 No Change
Weekend Per Day $100 No Change
Creative Studio 1-6
Resident:

Monthly Per Month $395 No Change
Weekly Per Week $125 No Change
Daily Per Day $35 No Change
Private Non-Resident or Commercial:

Monthly Per Month $494 No Change
Weekly Per Week $157 No Change
Daily Per Day $44 No Change
Sound Studio 1-2
Planning Services Division Footnotes: Per Hour $12 No Change Private Non-Resident or Commercial Per Hour $15 No Change Co-Sponsored Groups
Weekday - San Ramon Library PCS Conference Room, Dougherty Station Library Community Room - Setup and Clean not included in fees - Room may be reserved one (1) year in advance
Per Hour
$16 No Change
Weekend - San Ramon Library PCS Conference Room, Dougherty Station Library Community Room - Setup and Clean not included in fees - Room may be reserved one (1) year in advance
Per Hour
$16 No Change
Notes:
*Kitchen rented in conjunction with a Grand or Large Room **All hours must correspond with all hours rented in the Fountain Room.

Rental Deposit Deposit $2,500 No Change
Resident Rental Fee Per Hour $350 No Change
Resident Non-Profit Rental Fee Per Hour $250 No Change
CITY HALL ROTUNDA (10 hr. min.)

ALCOSTA SENIOR AND COMMUNITY CENTER AND RAMONA PARK GAZEBO RENTAL FEES Alcosta Senior and Community Center and Ramona Park Gazebo Rental Rates ***All hours rented must correspond with all hours rented in the Terrace Room. ****All hours rented must correspond with all hours rented in the Ridgeview Room *****All hours rented must correspond with all hour rented in the Bella Vista Room

Page 31 of 41 ends

9.2.b
Packet Pg. 204 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Resident − Private or Group
Weekday Per Hour $105 No Change
Weekend Per Hour $105 No Change
Non-Resident − Private or Commercial
Weekday Per Hour $135 No Change
Weekend Per Hour $135 No Change
Non-Profit Organizations:

Groups 1-50
Weekday Per Day $62 Non-Profit Rate = Resident Rate minus 50% Weekend Per Day $78 Non-Profit Rate = Resident Rate minus 50% Groups 51-149
Weekday Per Day $120 Non-Profit Rate = Resident Rate minus 50% Weekend Per Day $150 Non-Profit Rate = Resident Rate minus 50% Groups 150-200
Weekday Per Day $178 Non-Profit Rate = Resident Rate minus 50% Weekend Per Day $222 Non-Profit Rate = Resident Rate minus 50% San Ramon Resident
Groups 1-50
Weekday Per Day $124 Increase by 3.53% CPI
Weekend Per Day $155 Weekday Fee plus 25%
Groups 51-149
Weekday Per Day $239 Increase by 3.53% CPI
Weekend Per Day $299 Weekday Fee plus 25%
Groups 150-200
Weekday Per Day $355 Increase by 3.53% CPI
Weekend Per Day $444 Weekday Fee plus 25%
San Ramon Business
Groups 1-50
Weekday Per Day $143 Resident Rate plus 15%
Weekend Per Day $179 Resident Rate plus 15%
Groups 51-149
Weekday Per Day $275 Resident Rate plus 15%
Weekend Per Day $344 Resident Rate plus 15%
Groups 150-200
Weekday Per Day $409 Resident Rate plus 15%
Weekend Per Day $511 Resident Rate plus 15%
Non-Resident and Non-Resident Business
Central Park, Rancho San Ramon Community Park, Athan Downs Park, Alcosta Senior And Community Center Park And Gardens, Valley View Park, Ramona Park, San Ramon Sports Park, Memorial Park, Monarch Park, Sunrise Ridge Park, Critter Crossroads, and Hidden Valley Group Picnic Rental Fees

Page 32 of 41 ends

9.2.b
Packet Pg. 205 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Groups 1-50
Weekday Per Day $155 Resident Rate plus 25%
Weekend Per Day $194 Resident Rate plus 25%
Groups 51-149
Weekday Per Day $299 Resident Rate plus 25%
Weekend Per Day $374 Resident Rate plus 25%
Groups 150-200
Weekday Per Day $444 Resident Rate plus 25%
Weekend Per Day $555 Resident Rate plus 25%
Food Truck Fee
Weekday Per Day $53 No Change
Weekend Per Day $53 No Change
Groups up to 26
Weekday Per Session $168 No change
Weekend Per Session $210 Weekday Fee plus 25%
Groups 26 to 50
Weekday Per Session $335 No change
Weekend Per Session $419 Weekday Fee plus 25%
Groups 51 and larger
Weekday Per Session ll Parks & Community Services No change Weekend Per Session ll Parks & Community Services No change Groups up to 26
Weekday Per Session $210 Resident Rate plus 25%
Weekend Per Session $263 Resident Rate plus 25%
Groups 26 to 50
Weekday Per Session $419 Resident Rate plus 25%
Weekend Per Session $524 Resident Rate plus 25%
Groups 51 and larger
Weekday Per Session ll Parks & Community Services No change Weekend Per Session ll Parks & Community Services No change Amphitheater Set Up Fee Per Event $75 New Fee Added in FY25-26 All Groups - 6 Hour Min Per Hour $125 No change
Central Park Amphitheater
San Ramon Olympic Pool & Aquatic Park And Dougherty Valley Aquatic Center - Group Picnic Rental Fees San Ramon Resident
Non-Resident
Amphitheater Use*

Page 33 of 41 ends

9.2.b
Packet Pg. 206 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
All Groups - 2 Hour Min Per Hour $150 No change
All Groups - 6 Hour Min Per Hour $84 No change
All Groups - 2 Hour Min Per Hour $100 No change
*May require Special Event Permit Application in addition to fee Turf Fields
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District
Per Hour $15 $1.00 Increase - User Agreement
Adult Co-Sponsored Organizations, San Ramon Residents $22 $1.00 Increase - User Agreement Non-Resident $36 $1.00 Increase - User Agreement
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $251 Increase by 3.53% CPI For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $151 New Fee in FY25-26 - 60% of existing full day “For Profit” Camp/Tou Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day $251 Increase by 3.53% CPI Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day $151 New Fee in FY 25-26 - 60% of Co-Sponsored Organizations and SRVUSD - Special Event Fee
Extra Fee Per Hour $164 Increase by 3.53% CPI
Light Fee at Sports Fields
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $31 Increase by 3.53% CPI San Ramon Residents Per Hour $31 Increase by 3.53% CPI
Non-Resident Per Hour $61 Increase by 3.53% CPI
Synthetic Fields – Tiffany Roberts Park
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $46 Increase by 3.53% CPI San Ramon Residents Per Hour $62 Increase by 3.53% CPI
Non-Resident Per Hour $146 Increase by 3.53% CPI
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 Increase by 3.53% CPI For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 New Fee in FY 25-26 - 60% of existing full day “For Profit” Camp/Tou Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251 Increase by 3.53% CPI Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day + Field Hourly Rate $151 New Fee in FY 25-26 - 60% of the Co-Sponsored Organizations and SRVUSD - Special Event Fee
Synthetic Fields – Rancho San Ramon Sports Park
Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $68 Increase by 3.53% CPI San Ramon Residents Per Hour $90 Increase by 3.53% CPI
Non-Resident Per Hour $219 Increase by 3.53% CPI
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 Increase by 3.53% CPI Rancho San Ramon Amphitheater
Outdoor Athletic Facilities

Page 34 of 41 ends

9.2.b
Packet Pg. 207 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 New Fee in FY 25-26 - 60% of existing full day “For Profit” Camp/Tou Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251 Increase by 3.53% CPI Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours)
Per Field Day + Field Hourly Rate $151 New Fee in FY 25-26 - 60% of the Co-Sponsored Organizations and SRVUSD - Special Event Fee
Synthetic Soccer / Lacrosse Field & Diamond - Sunrise Ridge Park Co-Sponsored Organizations and San Ramon Valley Unified School District Per Hour $46 Increase by 3.53% CPI San Ramon Residents Per Hour $62 Increase by 3.53% CPI
Non-Resident Per Hour $146 Increase by 3.53% CPI
For Profit Camp/Tournament Per Field Day + Field Hourly Rate $501 Increase by 3.53% CPI For Profit Camp/Tournament (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $301 New Fee in FY 25-26 - 60% of existing full day “For Profit” Camp/Tou Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Field Day + Field Hourly Rate $251 Increase by 3.53% CPI Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee (Half Day - up to 4 hours) Per Field Day + Field Hourly Rate $151 New Fee in FY 25-26 - 60% of the Co-Sponsored Organizations and SRVUSD - Special Event Fee Sand Volleyball Courts
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District
Per Hour $14 Increase by 3.53% CPI
Adult Co-Sponsored Organizations, San Ramon
Residents
Per Hour $22 Increase by 3.53% CPI
Non-Resident Per Hour $37 Increase by 3.53% CPI
Tennis Courts
Storage Facilities
Rancho San Ramon Community Park Per Month Per Unit $205 Increase by 3.53% CPI Batting Cages**
Youth Co-Sponsored Organizations and San Ramon Valley Unified School District
Per Hour $14 Increase by 3.53% CPI
Adult Co-Sponsored Organizations, San Ramon Residents Per Hour $22 Increase by 3.53% CPI Non-Resident Per Hour $37 Increase by 3.53% CPI
Concession Stands***
Scoreboard – (Central Park + Rancho San Ramon)
Private Organizations – Monthly Per Month $400 No Change Private Organizations - Daily Per Day $100 No Change
Notes:
*The Rancho San Ramon Sports Park Batting Cages are included in the rental of the adjoining baseball field (Turf Field)
**For co-sponsored user groups only
***In conjunction with Special Event Permits

Page 35 of 41 ends

9.2.b
Packet Pg. 208 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Extra Equipment
Additional microphones Per Day $26 No Change
Podium Per Day $26 No Change
Piano Per Day $103 No Change
Other Fees
Basic Sound and Light Package No Charge No Change
Box Office Fees $100 No Change
Ticket Printing Per Ticket $0.30 No Change
Complimentary Ticket Fees *** Per Ticket $2.50 No Change Cultural Growth Surcharge** Per Ticket $2 No Change
Cultural Growth Surcharge for non-ticketed events – less than 50 attendees Per Ticket $30 No Change Cultural Growth Surcharge for non-ticketed events – 50 or more attendees Per Ticket $70 No Change Patron Ticket Mailing Fee Per Ticket $1 No Change
Patron Box Office Purchasing Fee Per Ticket $0.50 No Change Patron Online Purchases Fee Per Ticket $1.50 No Change
Green Room Rental (when used as a dressing room or green room concurrently with a performance or rehearsal in the Front Row Theater) Per Hour (8 hr max) $48 Increase by 3.53% CPI Technical Theater Staff** Per Hour Per Person $40.00 Increase by 3.53% CPI Production Manager II Per Hour Per Person $49.00 Increase by 3.53% CPI House Staff** Per Hour Per Person $40.00 Increase by 3.53% CPI San Ramon Resident & Non-Profit / Co-Sponsored Organizations Free Events, Rehearsals (no admission fee), Ticketed Events, Theatrical Use & Fundraisers
Weekday Per 3 Hours $187 Increase by 3.53% CPI
Weekend Per 3 Hours $241 Increase by 3.53% CPI
Weekday Flat Fee Up to 8 Hours $374 Increase by 3.53% CPI Weekend Flat Fee Up to 8 Hours $481 Increase by 3.53% CPI Hourly Overtime Rate for use over eight (8) hours
Weekday Per Hour $80 Increase by 3.53% CPI
Weekend Per Hour $107 Increase by 3.53% CPI
Non-Resident Private or Commercial Organization
Free Events, Rehearsals (no admission fee), Ticketed Events, Theatrical Use & Fundraisers
Weekday Per 3 Hours $293 Increase by 3.53% CPI
Weekend Per 3 Hours $347 Increase by 3.53% CPI
Weekday Flat Fee Up to 8 Hours $588 Increase by 3.53% CPI Dougherty Station Community Arts Center Front Row Theater Rental Fees

Page 36 of 41 ends

9.2.b
Packet Pg. 209 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Weekend Flat Fee Up to 8 Hours $694 Increase by 3.53% CPI Hourly Overtime Rate for use over eight (8) hours
Weekday Per Hour $80 Increase by 3.53% CPI
Weekend Per Hour $107 Increase by 3.53% CPI
Notes:
**Overtime and double time rates for staff will apply as required by law.

Dougherty Valley Performing Arts Center Rental Fees
Performance Base Rent (Full Day) − Includes Lobby, Theater, Dressing Rooms & Loading Dock
Weekend Friday through Sunday plus reimbursement for required technical theater and house management staff Per 8 Hour Day $1,194 Increase by 3.53% CPI Weekday Monday through Thursday plus reimbursement for required technical theater and house management staff Per 8 Hour Day $820 Increase by 3.53% CPI Additional Time (same day) plus reimbursement for required technical personnel
Per Hour $130 Increase by 3.53% CPI
Rehearsal and Technical Time – Weekday (Monday through Thursday) plus reimbursement for required technical personnel Per 8 Hour Day $497 Increase by 3.53% CPI Rehearsal and Technical Time – Weekend (Friday through Sunday) plus reimbursement for required technical personnel Per 8 Hour Day $610 Increase by 3.53% CPI Other Fees
Percentage Rent % of gross ticket sales 10% No Change
Percentage Rent for 3 or more shows in the same day if greater than the base rent % of gross ticket sales 8% No Change
Outdoor Set Up Fee Per Event $75 New Fee in FY 25-26
Rent – Lobby Only Per 8 Hour Day $526 Increase by 3.53% CPI DVPAC Studio Rental (for a rehearsal or performance in the Studio Room) Per 8 Hour Day $469 Increase by 3.53% CPI Box Office Fees $415 Increase by 3.53% CPI
DVPAC Studio Rental (when used in conjunction with a performance or rehearsal on the stage) Per 8 Hour Day $268 Increase by 3.53% CPI Ticket Printing Per Ticket $0.30 No Change
Cultural Growth Surcharge* Per Ticket $2 No Change
Cultural Growth Surcharge for non-ticketed events under 300 guest Surcharge $200 No Change Cultural Growth Surcharge for non-ticketed events over 300 guest Surcharge $400 No Change Patron Ticket Mailing Fee Each $1 No Change
Patron Box Office Ticket Purchasing Fee Per Ticket $0.50 No Change *Cultural Growth Surcharge – Two dollars ($2.00) will be collected for every ticket sold at DVPAC and the Front Row Theater for all events with ticket prices over $5.00. This money will be used in the subsequent fiscal year to purchase/replace theatrical equipment and/or to offset rental fee for nonprofit groups producing a performance in either City theater. *** Comp Ticket fee for rental clients that exceed 5% of the house capacity or more than 10 comp tickets at the Front Row Theater

Page 37 of 41 ends

9.2.b
Packet Pg. 210 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Complimentary Ticket Fees Per Ticket $2.50 No Change
Patron Online Purchases Fee Per Ticket $1.50 No Change
Technical Theater Staff** Per Hour Per Person $40 Increase by 3.53% CPI Production Manager II Per Hour Per Person $49 Increase by 3.53% CPI Sign Language Interpreter Per Hour Per Person $107 Increase by 3.53% CPI House Staff Per Hour Per Person $40 Increase by 3.53% CPI Basic Sound / Light Production Each No Change
Extensive Lighting Production Each $232 No Change
Extensive Sound Production Each $155 No Change
Spot Lights Per Light $103 No Change
Sales of Merchandise % Commission on Items Sold 25% No Change Marley Dance Floor Per Event $155 No Change
Piano Per 8 Hour Day $103 No Change
Piano Tuning Each $250 Increase fee to actual cost (quotes of $230 and $250 depending on Projector Rental Per Day $258 No Change
Notes:
**Overtime and double time rates for staff will apply as required by law.

Equipment Rental Fees
Change of Equipment Set-Up Fee Each $100 No Change
Additional Microphone with or without Stand Each $25 No Change Full Length Podium (No PA System) Each $25 No Change
Portable Bar Each $125 No Change
Fountain Room 28’x 12’ Dance Floor (21 Modules) – Depending on availability and room capacity, additional dance floor modules may be rented for $10.00 for 4’ x 4’ module
Each $200
No Change
Terrace Room 24’ x 8’ Dance Floor (12 Modules) – Depending on availability and room capacity, additional dance floor modules may be rented $10.00 for 4’ x 4’ module
Each $150
No Change
Carpet Cleaning (Fountain Room) Each
Maintenance Fee Included in
Rental
Carpet Cleaning (Terrace Room) Each
Maintenance Fee Included in
Rental
Non Refundable- Sanitization/Cleaning Fee (Bundle) Each $125 No Change Non Refundable – Sanitization/Cleaning Fee (Grande) Each $100 No Change *Cultural Growth Surcharge – Two dollars ($2.00) will be collected for every ticket sold at DVPAC and the Front Row Theater for all events with ticket prices over $5.00. This money will be used in the subsequent fiscal year to purchase/replace theatrical equipment and/or to offset rental fee for nonprofit groups producing a performance in either City theater. *** Comp Ticket fee for rental clients that exceed 5% of the house capacity or more than 10 comp tickets at the Front Row Theater

Page 38 of 41 ends

9.2.b
Packet Pg. 211 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Non Refundable- Sanitization/Cleaning Fee (Large) Each $75 No Change Non Refundable- Sanitization/Cleaning Fee (Medium) Each $50 No Change Non Refundable- Sanitization/Cleaning Fee (Small) Each $25 No Change Room A/V System + one (1) microphone – Portable A/V
System Per Day $50 No Change
Portable Stage
Small Each $250 No Change
Large Each $500 No Change
Room A/V System + one (1) microphone (SRCC FOUNTAIN, Terrace, Bella Vista, Ridgeview, Vista Grande) Per Day $100 No Change
Room A/V System + one (1) microphone (Russell) Per Day $50 No Change Cocktail Tables Per Table $25 No Change
San Ramon Olympic Pool & Aquatic Park
Whole Facility (Daily Rate) + Lifeguard Fee (up to 11 hours) Per Day $1,804 Increase by 3.53% CPI Whole Facility (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $181 10% of whole facility daily rental rate and round up to the next whole 50-Meter Pool (Daily Rate) + Lifeguard Fee (up to 11 hours) Per Day $1,178 Increase by 3.53% CPI 50-Meter Pool (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $118 10% of whole facility daily rental rate 25-Yard Pool (Lap / Training Pool) (Daily Rate) + Lifeguard Fee Per Day $785 Increase by 3.53% CPI 25-Yard Pool (Lap / Training Pool) (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $79 10% of whole facility daily rental rate Whole Facility – Two (2) Day Rental (Daily Rental) - Includes use of classroom and timing board (must have a qualified timer to operate timing board) Per Two Days $2,824 Increase by 3.53% CPI
Whole Facility – Two (2) Day Rental (Hourly Rate after 11 hours each day) + Lifeguard Fee
Per Hour $283 10% of whole facility daily rental rate
Dougherty Valley Aquatic Center
Whole Facility + Lifeguard Fee up to 11 hours Per Day $1,188 Increase by 3.53% CPI Whole Facility (Hourly Rate after 11 hours) + Lifeguard Fee Per Hour $119 10% of whole facility daily rental rate Whole Facility – Two (2) Day Rental + Lifeguard Fee (up to 11 hours each day).

Includes use of timing board (must have qualified timer to operate timing board)
Per Two Days $1,880
Increase by 3.53% CPI
Whole Facility – Two (2) Day Rental (Hourly Rate after 11 hours each day) + Lifeguard Fee
Per Hour $188 10% of whole facility daily rental rate
Recreation Swim Team Meet + Lifeguard Fee Per Hour $87 Increase by 3.53% CPI Equipment
Colorado Computer
Deposit Deposit $500 No change
Per Day Per Day $50 No change
Water Polo Tournament
San Ramon Olympic Pool & Aquatic Park And Dougherty Valley Aquatic Center Special Event And Lane Use Fees

Page 39 of 41 ends

9.2.b
Packet Pg. 212 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Water Polo Tank Per Hour Per Tank $87 Increase by 3.53% CPI Combined Lane Rental & Lifeguard 25 Yard Course Fee
City Co-Sponsored Groups Per Hour Per Lane $12 25% less than resident rate - round up to nearest whole dollar Resident Per Hour Per Lane $15 Increase by 3.53% CPI
Non-Resident Per Hour Per Lane $19 25% more than resident rate - round up to nearest whole dollar Combined Lane Rental & Lifeguard 50 Meter Course Fee
City Co-Sponsored Groups Per Hour Per Lane $18 25% less than resident rate - round up to nearest whole dollar Resident Per Hour Per Lane $23 Increase by 3.53% CPI
Non-Resident Per Hour Per Lane $29 25% more than resident rate - round up to nearest whole dollar Groups up to 50 (minimum of 3 guards required)
First 2 Hour Base $264 No Change
Each Additional Hours Per Hour $80 No Change
Groups 51 – 100 (minimum of 5 guards required)
First 2 Hour Base $528 No Change
Each Additional Hours Per Hour $158 No Change
Groups 101 – 150 (minimum of 7 guards required)
First 2 Hour Base $793 No Change
Each Additional Hours Per Hour $238 No Change
Non-Resident
Groups up to 50 (minimum of 3 guards required)
First 2 Hour Base $333 No Change
Each Additional Hours Per Hour $80 No Change
Groups 51 – 100 (minimum of 5 guards required)
First 2 Hour Base $661 No Change
Each Additional Hours Per Hour $158 No Change
Groups 101 – 150 (minimum of 7 guards required)
First 2 Hour Base $993 No Change
Each Additional Hours Per Hour $238 No Change
Lifeguard Fees
Based on group size and amenities requested Per Hour Per Lifeguard $23.50 No change Inflatable Obstacle Course
Inflatable Add On Per Hour $50 No change
Resident - Private
Individual Gym Floor Fee A, B, or C Per Hour $72 Increase by 3.53% CPI Main Gym Floor Fee Per Hour $139 Increase by 3.53% CPI
For Profit Camp/ Tournament – Special Event Fee Per Day + Gym Hourly Rate $251 Increase to offset facility costs and match existing field fees for Spe Scoreboard Fee Per Day Per Court $104 Increase by 3.53% CPI Non-Resident - Private
Individual Gym Floor Fee A, B, C Per Hour $91 Increase by 3.53% CPI Pine Valley And Iron Horse Gymnasia Rental Fees

Page 40 of 41 ends

9.2.b
Packet Pg. 213 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule) City of San Ramon Master Fee Schedule FY25-26
Fee Name Unit FY2025-26 Description
Main Gym Floor Fee Per Hour $174 Increase by 3.53% CPI
For Profit Camp/ Tournament – Special Event Fee Per Day + Gym Hourly Rate $251 Increase to offset facility costs and match existing field fees for Spe Scoreboard Fee Per Day Per Court $104 Increase by 3.53% CPI City Co-Sponsored Groups
Individual Gym Floor Fee A, B, C Per Hour $54 Increase by 3.53% CPI Main Gym Floor Fee Per Hour $105 Increase by 3.53% CPI
Co-Sponsored Organizations and San Ramon Valley Unified School District – Special Event Fee Per Day + Gym Hourly Rate $251 Increase to offset facility costs and match existing field fees for Spe Scoreboard Fee Per Day Per Court $50 No Change

Page 41 of 41 ends

9.2.b
Packet Pg. 214 Attachment: B: Draft FY25-26 Master Fee Schedule with Description (2025-16 : Master Fee Schedule)

← All documents from this meeting