Cities Index.
Agenda packet

Santa Ana City Council
October 18, 2022

Document
Agenda packet
Meeting
October 18, 2022
Body
Santa Ana City Council
Pages
44
Original file
147.2 MB
Text extracted from the city's file for reading and search. Open the original on santa-ana.primegov.com. That file is the official record.

August 1, 2022
Table 1. A-Tech’s Key Personnel at a Glance
Personnel Role Licenses
Percentage
of Time
Years of
Experience
Expertise Select Clients Education
Casandra Williams, CAC, DPH,

CIEC, CEICC
Contract Administer
CAC #05-3892
ACAC #1404017
DPH #3671
10% 28+
Project Monitoring/Management
Client Relationship
OSHA Safety Training
Infection Control Risk Assessments
Garden Grove Unified School District
Roman Catholic Bishop of Orange
Irvine Unified School District
Claremont Mckenna College
Business Administration & Management 2017, Goldman Sachs 10K Small Business
Roohi Toosi, PE
Project Manager
Technical Lead
QA/QC Director
PE CA #91825 25% 7+
Environmental Due Diligence
Phase I & II ESAs
Emerging Contaminants, PFAS
Project Management
LA Community College District
City of Alhambra
Caltrans District 7
Southern California Edison
MSc 2016, Civil and Environmental Engineering, UC Irvine BSc 2009, Petroleum Engineering, Tehran University, Iran Roosevelt Ward, CIH, CSP,
QISP
Health & Safety Director
CIH 11208 CP
CSP - 32397
25% 17+
Industrial Hygiene Monitoring
Environmental Remediation
Indoor Air Quality Assessments
Certified Safety Expert
Searles Valley Minerals
Los Angeles Unified School District
Nevada Power
Edward Clark Generating Station
MSc 2009, Environmental Health , University of Nevada
BS 2003, Occupational Safety & Health, Indiana University Jay Sandoval, CIH ESAs Lead CIH 12379 CP 50% 16+
Environmental Due Diligence
Industrial Hygiene
Phase I & II ESAs
Remedial Design and Construction
Department of Toxic Substances Control
US Army Corps of Engineers
Southern California Edison
Southern California Gas Company
MSc 2010, Environmental Science, Cal-State Fullerton
BA 2022, Environmental Science, UC Irvine
Joe Williams, CAC, DPH Hazardous Material Lead
CAC #14-5269
DPH #19524
50% 15+
HazMat Site Assessments
Public Client Management
Team Coordination and Supervision
Pre-Demolition Surveys
LA Community College District
City of Burbank
Inland Empire Utility Agency
City of Santa Ana
BSc 2008, Sociology, Minor in Business Administration,
Michigan State University, Lansing, MI
Heriberto Robles, PhD, DABT Risk Assessment Expert DABT 25% 39+ Environmental Toxicology
Health Risk Assessment
Air Quality Assessment
Industrial Health and Safety
Southern California International Airport
City of Alameda, Santa Fe Springs,
Torrance
Empire mine (Grass Valley, CA)
PhD 1985, Animal Science and Toxicology, New Mexico State University, Las Cruces, NM
MSc 1983, Animal Science And Toxicology, New Mexico State University, Las Cruces, NM
Patrick Naffah, CIH, DPH Senior Scientist
CIH #12604
CDPH #LRC00008983
50% 6+
Phase I & II ESAs
Solid & HAZ Waste Management
HazMat Site Assessments
Chemical/Oil Spill Prevention
California University of Riverside
Netflix, Inc.

Port of Seattle
Starbucks Corporation
BS 2017, Environmental Science, University of Washington Victoria Lopez, EIT, CAC, DPH Staff Engineer
CDPH #LRC000009214
CAC #22-7057
50% 4+
HazMat Site Assessments
Phase I & II ESAs
Indoor Air Quality Assessments
Pre-Demolition Surveys
Prime Healthcare Management
Burbank Public Works Department
Dignity Health
Superior Court of San Diego
BS 2018, Environmental Engineering, San Diego University City Council 16 – 22 10/18/2022
Proposal for
Various Environmental Services

Page 16 ends

August 1, 2022
Figure 1. A-Tech’s Organizational Chart

City Council 16 – 23 10/18/2022
Proposal for
Various Environmental Services

Page 17 ends

August 1, 2022
d. UNDERSTANDING OF NEED
A-Tech understands that the City of Santa Ana is planning to award contract(s) to qualified firms for providing various environmental assessment services in support of its Capital Improvement Program and other projects. It is our understanding that the required services are divided into two separate categories:
 Category I: Environmental Site Assessments (ESAs)
 Category II: Hazardous Material Surveys
Our approach for this as-needed contract is to designate a single point of contact to the City, who will be managing the daily tasks of awarded projects and ensuring delivery of high-quality products in a timely manner. A-Tech’s project manager is available 24/7 for responding to City’s requests and will coordinate the project requirements with A-Tech Team and staff as soon as the task orders are available.

A-Tech has utilized its 20 years of experience in conducting ESAs and Hazardous Material Surveys along with the RFP, Questions and Answers, and Amendments provided by the City to develop a general approach for successful completion of future projects. The scope of work and schedule for the example requested projects are provided in Section 2.0 of this proposal.

The Phase I ESAs will be conducted in accordance with the “Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process” published by the American Society for Testing and Materials (ASTM 1527-21). A-Tech’s general approach for completion of a successful Phase I ESA includes:
 A review of relevant background information such as the site location relative to major man-made and natural landmarks, and surrounding land use.
 A general review of the geologic, hydrogeologic, hydrologic and topographic conditions as they relate to potential pathways or migration conduits to and from the property. Topography will be noted to the extent visually or physically observed or determined from interviews, as well as the general topography of the area surrounding the Property. The physical setting evaluation will be made utilizing physical observations and the available United States Geological Survey (USGS)

7.5 Minute Topographic Map.
 A review of oil and gas fields in the vicinity of the site.  A compilation of site history and previous land use based on a review of historic aerial photographs dating back to the 1940s, available historic topographic maps, available historic fire insurance maps, and available city directories.
 A review of chain-of-title records to identify possible recorded environmental cleanup liens.  An assessment of the potential for the site to have been impacted by contaminants and/or vapor migration originating from off-site sources based on a review of federal, state, tribal, and local government agency records.
 A review of local municipal records including building permits, and zoning and land use records.

Category I: Phase I Environmental Site Assessment
City Council 16 – 24 10/18/2022
Proposal for
Various Environmental Services

Page 18 ends

August 1, 2022
 An inspection of the site to identify Recognized Environmental Conditions (RECs) that may include indications of the improper handling, storage, or use of potentially hazardous materials.

This task also includes interviews with accessible property owners, tenants, and/or local agency personnel about hazardous materials handling and disposal procedures.  An evaluation of the possible presence of hazardous materials in structures at the site and/or in the subsurface environment beneath the site, with recommendations, if appropriate, for additional investigations or remediation. A cost estimate of additional activities will be prepared and submitted with the Phase I ESA report.
 Request Environmental Data Resources, LLC (EDR) to conduct a search of government records and document potential sources of contamination at or in the vicinity of the property. EDR’s search includes federal, state, local, tribal, and EDR proprietary records for the property and for facilities within the distances per current ASTM practices. EDR will also search for any environmental liens associated with the Property. The list of research will include, but not be limited to, Environmental Protection Agency (EPA) National Priorities List (NPL) and Emergency Response Notification System List (ERNS); the RCRA generators, and treatment, storage and disposal (TSD) facilities list; Comprehensive Environmental Response Compensations, and Liability Information System (CERCLIS); and the State list of Leaking Underground Storage Tank (LUST) sites. Additionally, local governments will be contacted for a file search and review.  An evaluation of potential PFAS sources on site based on available PFAS databases and historical operations at the site.

Our experience with environmental projects for various government organizations informs us that Phase I ESAs may be needed because of acquisition of land or facilities, selling, or leasing facilities, terminating leases, or any other property transactions. The Phase I ESAs may conclude that there are no RECs, in which case the project will be completed, or may trigger additional investigations leading to Phase II ESAs. It is also possible that Phase I ESAs have been conducted by other entities and the City needs to initiate Phase II ESAs with the objective of collecting soil, soil vapor, and groundwater data to further assess the environmental conditions. The systematic approach for conducting Phase II ESAs is briefly described below:

Meeting with the City Staff
The initial review and identification of RECs will be completed during the Phase I ESAs. If a Phase I ESA recommends additional investigation to be conducted at a site, A-Tech will discuss the environmental requirements with the City staff and follow their instructions closely. The findings of the initial review will be discussed with the City to clarify the environmental concerns and to fill in any data gaps. Discussion will also include designation of a regulatory oversight agency, if that is the approach that is advocated for by the City. Potential regulatory oversight agencies include Cities and Counties’ Health or Environmental Departments, the Fire Department, the South Coast Air Quality Management District (SCAQMD), Regional Water Quality Control Boards (RWQCB), Department of Toxic Substances Control (DTSC), EPA Region 9, or other local agencies. It is A-Tech’s practice not to contact Category I: Phase II Environmental Site Assessments
City Council 16 – 25 10/18/2022
Proposal for
Various Environmental Services

Page 19 ends

August 1, 2022
the regulatory agencies unless directed by the client. The initial review and discussions with City may lead to Phase II ESAs.

Preparation of Work Plan
If the Phase II ESA is warranted, A-Tech will prepare a work plan by focusing on the City’s specific requirements and in accordance with ASTM E1903-19. The purpose of the work plan is to have a clear and concise scope of work and the corresponding protocols and methodologies for implementation in accordance with acceptable regulatory guidelines. After review of the work plan by the City, it is submitted to the oversight agency for approval before it can be implemented.

Permitting
Most of the environmental investigation and remediation activities require permitting from various agencies. Certain soil investigations that do not reach groundwater may not require permitting. Most permits are obtained over the counter but permits related to remediation take time depending on the scope. In Orange County a subsurface investigation requires Well Construction, Well Destruction, Test and Exploratory Hole permit from the Orange County Health Care Agency if 1) the boring is deeper than 50 feet (ft); 2) the boring encounters groundwater; and 3) the boring will be open for more than 24 hours. If requested by the City, A-Tech would prepare the application and proceed with securing the permits. Some regulatory agencies may require a work plan along with the application for permitting.

Subcontractor Selection
A-Tech prepares the scope of the work that will be performed by subcontractors (drillers, geophysics, etc.) and requests three subcontractors to bid on. A-Tech recommends the most qualified subcontractor to the City for approval. A-Tech enters into a subcontract agreement with the selected contractor and requires the subcontractor to fulfill the insurance requirements of the City and A-Tech’s stringent health and safety requirements.

Work Plan Implementation
Prior to starting the field work, the City and appropriate regulatory oversight agency will be notified in case inspection is required. A copy of the work plan and health and safety plan will be available on the field. All subcontractors will be required to follow health and safety requirements including their own and any requirements imposed by the City. Daily health and safety briefing will be performed prior to any field work. Daily progress reports will be sent to the City’s designated project manager.

Data Evaluation and Reporting
Upon receipt of analytical data, A-Tech performs an evaluation and interpretation of the data in the context of the regulatory screening levels and guidance provided by the EPA, DTSC, and RWQCBs. The findings determine which of the following course of action is required:
 No further action needed; in which case the report will request site closure.  Additional investigation is needed to further delineate the extent of Chemicals of Potential Concern (COPCs).
 Investigation is completed but remediation is required.

City Council 16 – 26 10/18/2022
Proposal for
Various Environmental Services

Page 20 ends

August 1, 2022
A-Tech prepares a draft report for review by the City and after addressing the comments, the report is suitable for submitting to the regulatory agencies.

Site Characterizations/Remedial Investigations
If the Phase II ESA confirms the presence of contamination in soil or groundwater, Remedial Investigation is required to determine the best available approach for site cleanup. Complete Phase I and II ESAs and additional investigations resulting from them will effectively characterize the physical, biological, and chemical systems existing at a contaminated site, and develop thorough understanding of the site conditions. Based on the findings of the Phase I and II ESAs and in accordance with ASTM E1689-95 (updated in 2014), A-Tech will develop a Site Conceptual Model (SCM). The SCM is a narrative and/or graphical representation of the current understanding of hydrogeologic conditions and contaminant distribution in the soil-water system beneath the Site. The SCM provides a description of migration pathways of the Chemical of Concerns (COC) and the processes and mechanisms that affect the distribution of COCs in soil vapor, soil, and groundwater. The SCM represents: A geologic crosssection of the Site that effectively identifies the soil profile and types of the soil layers (i.e., clay, silt, sand); Depth to groundwater and the hydraulic gradient within the aquifer; Established background concentrations; COCs concentrations and the extent of their plumes; Contaminant transport pathways and human exposure; and Remediation target zone.

After the site is effectively characterized and the SCM is developed, A-Tech will conduct a risk assessment to evaluate the adverse effects of the Site’s current conditions on human health and environment. If human health or the ecosystem is threatened by the contamination, Risk-Based Corrective Action must be selected and implemented in accordance with ASTM E2081-00 (revised in 2015). A-Tech will conduct a Focused Feasibility Study to evaluate various applicable remedial technologies including no action and propose selection of the most appropriate remedial approach. The flowchart provided in Figure 2 demonstrates the processes and sequence of activities that are involved in successful completion of an environmental remediation project that is initiated by the City’s request.

A-Tech proposes to evaluate the potential for chemicals associated with the site to cause adverse effects on human health or environmental receptors in the absence of any remedial action. A-Tech's risk assessment approach is designed to fully utilize existing data and information generated during previous investigations at the site in order to minimize the costs and time required to produce a quality document.

A-Tech’s risk assessments are consistent with the requirements of both the California Department of Toxic Substances Control (DTSC) and the U.S. Environmental Protection Agency (USEPA).

The risk assessment will include the selection of chemicals of potential concern (COPCs), use of critical toxicity factors (i.e., reference doses [RfDs] for non-carcinogens and slope factors for carcinogens) in estimating potential health risks and hazards. RfDs and cancer slope factors developed by the DTSC and USEPA will be used for estimating potential health risks. A report detailing the results of this risk assessment will be prepared in a straightforward format for the review and approval by the regulatory agency. The report will include the justification for the selection of exposure pathways and assumptions necessary to support the estimation of potential health risks and hazards.

Category I: Human Health Risk Assessments
City Council 16 – 27 10/18/2022
Proposal for
Various Environmental Services

Page 21 ends

August 1, 2022
Figure 2. ESA Sequence from Project Initiation to Completion City Council 16 – 28 10/18/2022
Proposal for
Various Environmental Services

Page 22 ends

August 1, 2022
Asbestos Project Management
A-Tech’s Hazardous Material Surveys Lead will assist the City’s project manager in the management of any asbestos projects of any size, developing asbestos testing and sampling plans, providing consultation regarding asbestos regulations and requirements, and scheduling and executing asbestos-related projects.

Asbestos Surveys
Once all pre-field activities are completed, A-Tech’s field personnel will drive to the job site to begin conducting the field activities. A-Tech utilizes trained Certified Site Surveillance Technicians (CSSTs) or Certified Asbestos Consultants (CACs) for all asbestos inspections, operation and maintenance preparation, project monitoring and clearance monitoring services. Each of A-Tech’s field technicians is outfitted with all necessary equipment and supplies to conduct all types of assessments and clearances, including but not limited to microscopes, high and low-flow pumps, moisture meters, sampling media and tools. Additionally, each technician has a company-issued tablet computer to input all field data into our EnviroShare. Based on the project specifications and regulatory requirements and as requested by the City, we will conduct various types of asbestos surveys including, but not limited to, asbestos screening, limited asbestos surveys, path of construction/pre-renovation asbestos surveys, and pre-demolition surveys.

Friable asbestos containing material (ACM), as defined by the U.S. Environmental Protection Agency (EPA) and South Coast Air Quality Management District (SCAQMD), Rule 1403, is a material that, when dry, can be easily pulverized, crushed, or reduced to powder by hand pressure. Non-friable ACM that can potentially be broken, crumbled, pulverized, or reduced to powder during demolition or renovation activities are classified as Class I or Class II, non-friable ACM. To identify suspect friable and non-friable ACM, as required under California law, a California Occupational Safety Health Administration (CAL-OSHA) CSST and/or CAC is required to conduct visual and/or bulk assessments of a structure. During an assessment, our experts will identify homogenous areas of suspected ACMs for purpose of sampling in accordance with current CAL-OSHA, EPA, and Asbestos Hazard Emergency Response Action (AHERA) requirements. The homogeneous areas will be defined with respect to similarities in appearance, age, use, type, color, and/or texture. The condition and estimated quantity of the suspected materials will also be assessed. Once the visual inspection identifies homogeneous areas, bulk samples will be collected from building materials and submitted under standard chain of custody to a laboratory that is fully accredited by National Institute of Standards and Technology (NIST) through participation in the National Voluntary Laboratory Accreditation Program (NVLAP), or a laboratory that participates in the AIHA Laboratory Accreditation Programs, LLC (AIHA), a third-party that is an internationally recognized accreditation body for testing proficiency. We have excellent working relationships with our laboratories and will recommend using them as our subcontractor for City’s asbestos testing projects.

Category II: Asbestos Consulting Services
City Council 16 – 29 10/18/2022
Proposal for
Various Environmental Services

Page 23 ends

August 1, 2022
Asbestos Assessment Reports
Upon receipt of analytical results from the laboratory, A-Tech will prepare an asbestos assessment report that summarizes pre-field activities, field visual inspections, field sampling activities, sampling results, and recommendations. Our asbestos assessment reports will include (but not be limited to) the name of the surveyor, CACs and project manager; methods and procedures that were utilized in sampling and analysis; the date of survey; drawings and photographs of sampling locations; the laboratory qualifications statement; the existing conditions of the facility; a description of any identified ACM; and recommendations regarding asbestos handling and disposal, if needed.

If ACM was identified at the project site, an asbestos abatement work plan will also be prepared and submitted along with the asbestos assessment report that will clearly identify procedures and steps to be followed by the abatement contractors. After internal review and quality control, the draft reports will be reviewed by a professional editor and the editor’s comments will be reviewed and incorporated, as appropriate.

Asbestos Field Monitoring
When a project requires abatement, per regulations the City is required to directly hire an abatement contractor to perform the abatement activities. Once the abatement work plan is finalized, A-Tech’s Lead and CACs will assist the City’s project manager with bid package development and review of the submitted bids. A-Tech is experienced in coordinating, monitoring, and clearing abatement projects to make sure our clients can gain access to work areas in a timely manner. A-Tech will coordinate with the City on each project to ensure all project documentation meets all regulatory requirements. We will make sure that all required oversight agencies’ notifications and documents are submitted by the abatement contractor on time to avoid project delays.

During abatement activities, our experienced field technicians will provide oversight of abatement contractors’ activities and conduct personal and ambient air monitoring for the work area, as necessary.

We will work with the City to maintain the project schedule and can coordinate either with the necessary personnel to schedule clearance tests that will streamline the finalization of the project without lag time.

Our approach allows our client as much or as little involvement as they are comfortable with.

Asbestos Clearance (Close-Out) Report
When the asbestos abatement has been completed, a final visual clearance inspection is conducted followed by air sampling that is analyzed on-site by Phase Contrast Microscopy (PCM) utilizing a laboratory grade microscope, or off-site by Transmission Electron Microscopy (TEM) analysis, as necessary. For asbestos projects, we collect background, ambient and general air samples for on-site PCM analysis. If there is an elevated fiber concentration, we want to know right away to immediately modify engineering controls. When the entire abatement and remediation process is complete, a final close-out document will be prepared upon receipt of analytical results. The report will be delivered via email and/or standard mail based upon the City’s preference. The final close-out document contains, at a minimum, an executive summary indicating methods of work; areas and materials abated; regulatory compliance; sample analysis findings and conclusions. The close-out report would also include (but not be limited to) project diaries, project checklists, permits, air monitoring logs, contractors’ certifications, submittals and/or notifications, digital photographs, final visual inspection forms and clearance letters.

City Council 16 – 30 10/18/2022
Proposal for
Various Environmental Services

Page 24 ends

August 1, 2022
LBP Testing and Assessment
A-Tech utilizes trained Certified California Department of Public Health (DPH) Inspector/Assessors and DPH Project Monitors for all lead inspections, hazard assessments, project monitoring and clearance monitoring services. For Lead Based Paint (LBP) inspections of pre-designated areas, our DPH Certified Inspectors/Assessors, will utilize an X-Ray Florescence (XRF) analyzer and screen all painted surfaces, ceramic, and porcelain components by utilizing Cal-OSHA’s and the U. S. Department of Housing and Urban Development’s (HUD) sampling protocols. If analysis of suspect components using the XRF is not conclusive of presence of LBP, chip samples will be collected and analyzed by an AIHA accredited laboratory, utilizing Flame Atomic Absorption (AAS), in accordance with current regulatory requirements. We will summarize the results and procedures in an LBP Assessment Report that will include (but not limited to) name of the inspector, date of inspection, all the XRF readings and their location logs, paint chip sample collection procedures and locations, results of laboratory analyses and its accreditation statement, and recommendations for next steps. If LBP was identified in any of the materials, an abatement work plan will be prepared and submitted along with the assessment report for execution by the abatement contractor.

LBP Abatement and Monitoring
For lead abatement or paint stabilization activities, we inspect the integrity of the containment, review all applicable notification and/or submittal documentation, review all abatement worker certifications and ensure a copy of the survey and work plan are on site during the work period. The project is monitored continually to ensure no migration of LBP occurs and that proper engineering controls are implemented as well as proper protective equipment are being utilized by the lead abatement contractor throughout the project. Upon completion of the removal/stabilization project, our technicians conduct a final visual clearance inspection and clearance sampling. Upon approval of the visual inspection, clearance wipe or soil sampling is performed and sent to a certified laboratory that will analyze the samples using AAS. If requested, A-Tech will also obtain and submit samples which will be analyzed for Waste Stream Characterization (TCLP, TTLC and STLC) to determine disposal requirements for generated lead waste on a project.

As it was described above, A-Tech’s personnel will assist the City in overseeing abatement contractors’ activities. We will provide air monitoring and consultation on as-needed basis to ensure compliance with all the applicable rules and regulations, such as SCAQMD Rules 1403, 1150, 1166, and 1466. We understand that the City may be required to provide air monitoring during abatement and remediation activities, including but not limited to monitoring for dust, asbestos fiber content, VOCs emission, and any COPCs that might be emitted to the air by site disturbance. We have all the necessary equipment and tools in-house to conduct all the air monitoring requirements of this contract, and our personnel have experience utilizing PM10, using either direct-read or datalogging particle counters, and photoionization detectors (PID). Our qualified consultants will be available 24/7 to provide consultations to the City regarding air monitoring and any other pertinent environmental issues.

Category II: Lead-Based Paint Assessment Services
Category II: Air Monitoring and Consulting
City Council 16 – 31 10/18/2022
Proposal for
Various Environmental Services

Page 25 ends

August 1, 2022
We take pride in our immediate responsiveness, while delivering quality results. A-Tech’s personnel are available 24/7 to provide any environmental consultations regarding the City’s projects and activities.

Our team of professionals are trained and qualified to provide emergency response to the City’s requests.

We can mobilize to any site in Southern California within one to two hours of notification. For areas further away, we require a 24-hour notice prior to mobilization to the project site. If projects’ conditions require off-hours’ services, our personnel will work accordingly to get the job done within the required time frame.

Our field technicians reside throughout San Diego, Los Angeles, Orange, San Bernardino, and Riverside counties and are available to mobilize to any project site quickly. A-Tech works with technicians on rotation for evenings, weekends and holidays, to be prepared in the event of an after-hours service requests. Our project managers are experienced in adjusting technician availability and turnaround time of deliverables to fit the urgency and magnitude of any project.

A-Tech provides a wide variety of environmental consulting services, including but not limited to: Phase I & II Environmental Site Assessments, Remedial Investigations, Groundwater Studies, Groundwater Modeling, Feasibility Studies, Remedial Design and Operation, Asbestos and Lead Inspections and Surveys, Mold Inspections, HAZMAT/Universal Waste assessments, Project Monitoring/Management Services, Indoor Air Quality Investigations, Bioaerosol Monitoring, Air Quality Testing, Environmental Health & Safety Audits/Inspections/Trainings, Risk Assessments, Radon Testing, Silica Exposure Assessments, Industrial Hygiene Assessments and Monitoring, Stormwater Sampling, Emergency Spill Response & Clean-up, Environmental and Industrial Wastewater and Stormwater Testing. e. RELEVANT PROJECT EXPERIENCE
A-Tech has more 20 years of experience in conducting hazardous materials assessments and providing environmental consultation to its clients. Table 2 presents a select list of related projects that has been conducted by our team in the past three years. Additionally, more projects have been selected to provide further details on the experience of our team.

Category II: Emergency Response
Category I & II: Other Environmental Services
City Council 16 – 32 10/18/2022
Proposal for
Various Environmental Services

Page 26 ends

August 1, 2022
Table 2. Select Projects of Past 3 Years
Client Project Name and Type Location
Date
Completed
Related
Category
Baldwin Park Unified School
District
Early Childhood Facility
Phase I & II ESAs / HazMat
Surveys
Commerce, CA Sep-22 I & II
City of Burbank HazMat Surveys for 80+ City
Buildings Burbank, CA Ongoing II
Los Angeles County
Superior Court
HazMat Surveys of Various
Courts in the County Los Angeles, CA Ongoing II
Long Beach Airport Hangar Construction
Methane Investigation Long Beach, CA Aug-22 I
Exxon Mobil/Pacific Oil
Group
Gas Station Renovation UST
Removal Investigation Pasadena, CA Jun-22 I
City of Burbank City Yard UST Removal
Investigation
Burbank, CA May-22 I & II
Caltrans D7 Site Investigation Various, CA Mar-22 I
City of Pasadena HazMat Surveys of all City
Buildings Pasadena, CA Dec-21 II
US Army Corps of Engineers Extensive Site Investigation and Remediation Fort Wingate, NM Nov-21 I
Southern California Edison Bristol Substation PEA /
Phase I & II ESAs Santa Ana, CA Oct-21 I
Los Angeles Community
College District
LA City College HazMat
Surveys and Site
Investigation
Los Angeles, CA Aug-21 I & II
Malibu Mesa Water
Reclamation Plant
UST Removal Investigation /
HazMat Surveys
Malibu, CA Jul-21 I & II
Palo Verde Irrigation District
Maintenance Yard Site
Investigation and
Remediation
Blythe, CA Feb-21 I
Vandenberg Airforce Base
SLC-8 Launchpad Phase I
Environmental Baseline
Survey
Vandenberg, CA Jan-21 I
City of Pomona Fire Stations Site Closure Pomona, CA May-20 I City of Alhambra City Yard Phase II ESA Alhambra, CA Oct-19 I Southern California Edison Divisadero Substation Phase
I & II ESAs
Visalia, CA Jan-19 I
City Council 16 – 33 10/18/2022
Proposal for
Various Environmental Services

Page 27 ends

August 1, 2022
Type: Category I
Client: Southern California Edison (SCE)
Disclaimer: Mr. Toosi was the senior engineer of
this project at his previous role as the vice president of Rubicon Engineering Corporation.

Project Involvement: 2017-Nov 2021
Project Description: Land divestiture, even more
than land acquisitions, exposes clients to long term
potential environmental liabilities. For retirement of SCE’s Bristol Substation, which is located within the City of Santa Ana’s Bristol Street Corridor Specific Plan (BSCSP), Mr. Toosi’s team was hired for conducting initial environmental site assessments (ESAs). The objective of our work was to identify any Chemicals of Potential Concern (COPCs) that may have originated from SCE’s historical operations, delineate the extent of the impact, and remediate the Site consistent with the City of Santa Ana’s future use standards and other pertinent regulatory protocols and guidance documents. Our Phase I ESA report identified potential Recognized Environmental Conditions (RECs) that were attributed to polychlorinated biphenyls (PCBs), fuel-related petroleum hydrocarbons and volatile organic compounds (VOCs), and loss of mercury from the switches. Therefore, we planned for conducting additional site assessment and soil and soil vapor sampling at the Site. The Department of Toxic Substances Control Board (DTSC) was the oversight agency for this project. In 2020, we completed the Site characterization and delineated the area that was impacted by arsenic, lead, and PCBs. Our team developed the grading plans and managed the soil remediation by excavation activities. Upon completion of the remediation, the DTSC requested a Preliminary Endangerment Assessment (PEA) report to be prepared and submitted to the agency for Site closure. Mr. Toosi was the professional engineer who reviewed and stamped the PEA, which was submitted to the DTSC for final review. During this project, our team communicated every step of the work with the City of Santa Ana to ensure the BSCSP is not impacted by the investigation and remediation work.

Key Personnel: Mr. Toosi was the senior
engineer and Dr. Robles was the risk
assessment expert of this project.

1. Phase I & II ESAs, Risk Assessment, Remediation, and Preliminary Endangerment Assessment (PEA) for Southern California Edison's Bristol Substation, Santa Ana, CA Project Spotlight:
 Extensive Site Investigation
 PCB and Metal Remediation in Soil
 Phase I & II ESAs
 City of Santa Ana Interaction
 Bristol St. Corridor Specific Plan
 Major Utility Client
 Remedial Design/Implementation
Figure 3: Soil Excavation at SCE’s Facility,
Under Mr. Toosi’s Supervision
City Council 16 – 34 10/18/2022
Proposal for
Various Environmental Services

Page 28 ends

August 1, 2022
Type: Category I & II | Client: Baldwin Park Unified
School District | Project Period: Jun 2022-Sep 2022
Project Description: The Baldwin Park Unified
School District (BPUSD) is proposing a commercial
property to be transformed to an early childhood
care facility. In request of the Federal funding
agent, the BPUSD retained services of A-Tech to
conduct a Phase I ESA for this facility. A-Tech
identified several recognized environmental conditions (RECs) related to potential use of herbicides and pesticides from historical farming activities; potential release of petroleum hydrocarbon from oil & gas well fields in the Site vicinity; potential leakage of oil & grease from the Site’s UST; active contaminated site upgradient of the Site with ongoing remediation activities; truck staging activities and cargo freights at the Site; and the historical oil equipment service shop across the alley and upgradient to the Site. Based on these findings and the sensitive nature of the proposed land use, A-Tech recommended a Phase II ESA for this property. The Federal Early Childhood Education officer concurred with A-Tech’s recommendations and requested a Phase II ESA for the Site. A-Tech currently is developing the Phase II ESA work plan and planning on securing the required permits to conduct the field activities.

Key Personnel: Mr. Toosi is the project manager, Mr. Sandoval is the senior scientist, Mr. Ward is the CIH, Mr. Williams is the HazMat Survey Lead, and Ms. Lopez is the staff engineer for this project.

Type: Category I & II | Client: City of Burbank |
Project Period: January-May 2022
Project Description: A-Tech was retained by the
City of Burbank, Public Works Department to
conduct environmental monitoring during removal
of a 3,000-gallon USTs. The site is a Maintenance
and Park Storage located in the City of Burbank. ATech monitored for VOCs via direct-read instruments during the removal of the tank and
provided immediate recommendations, based on the
results of the readings. Additionally, we collected
samples to evaluate any leakage from the UST and conducted waste characterization. A-Tech also performed testing for asbestos at this building. All suspect asbestos containing-materials were tested and submitted to a certified laboratory for analysis. The city is A-Tech’s oldest client, and they rely on ATech for their environmental needs.

2. Phase I & II ESAs and Comprehensive Hazardous Material Surveys of Proposed Early Child Care Facility for Baldwin Park Unified School District, Commerce, CA

3. UST Removal Monitoring & Investigation, Asbestos and Lead Assessments for City of Burbank’s Building Maintenance & Park Storage, Burbank, CA Project Spotlight:
 Public Agency Client
 Hazardous Material Surveys
 Phase I & II ESAs
 Sensitive Property Assessment
 Concentrated Industrial Area
Project Spotlight:
 Construction Field Oversight
 Field Data Collection & Logging
 Gas Station Site
 PM10, and PID Utilization
 UST Removal Investigation
 Health & Safety Observations
 Hazardous Material Surveys
City Council 16 – 35 10/18/2022
Proposal for
Various Environmental Services

Page 29 ends

August 1, 2022
Key Personnel: Mr. Williams was the HazMat Survey lead, Mr. Sandoval was the site investigation and assessment lead, and Mr. Ward was the CIH for this project.

Type: Category I
Client: City of Alhambra
Project Involvement: 2018-2019
Disclaimer: Mr. Toosi was the deputy manager and
senior engineer of this project at his previous role as the vice president of Rubicon Engineering
Corporation.

Project Description: Five USTs containing gasoline
and waste oil were removed from the City of
Alhambra’s Maintenance Yard in the 1990s. However, the soil in the area was not evaluated for the presence of residual contamination. The LA Water Board on April 20, 2018, sent a Corrective Order Letter to the City. That order requested additional assessments to be conducted and a work plan for these activities must have been submitted to the LA Water Board by May 20, 2018. Our team was contacted by the City’s Utility Department’s Deputy Director, Mr. David Dolphin, to initiate developing the work plan and submit to the agency by the requested deadline. The LA Water Board approved our work plan and requested the results of the investigation in a technical report format by October 13, 2018. We completed all pre-field activities and hired subcontractors that we felt were the most qualified while offering the best value and mobilized our field crew on October 1, 2019. For this project, our team:
 Drilled a total of 12 borings using direct push technology (DPT) to a depth of 35 feet below ground surface and collected samples at every five-foot interval.  Analyzed the samples using a mobile laboratory subcontractor for total petroleum hydrocarbons (TPH) and volatile organic compounds; and
 Showed, based on the results of this investigation, that the removal of the USTs was conducted properly, and that no residual contamination was present at the site. On October 12, 2018, we Submitted the final Site Closure Report and requested closure for the site from the LA Water Board. On October 7, 2019, the Water Board issued a no-further-action letter and approved our request for Site Closure. The city was delighted with our team’s efforts to finish this project within the budget in a timely manner. We have established relationship with the LA Water Board’s staff and have a reputation as a diligent consultant, whose mission is to protect the environment and ensure its clients are not environmentally liable.

Key Personnel: Mr. Toosi was the deputy project manager and senior engineer for this project.

4. Regulatory Order Compliance and Environmental Site Investigation for City of Alhambra’s Maintenance Yard, Alhambra, CA
Project Spotlight:
 Fast-Paced & Short Notice Project
 Government/Municipality Client
 On-Site Chemical Analyses
 Environmental Site Investigation
 On-Call Support and Delivery
 Regulatory Agency Negotiations
 No-Further-Action Letter
City Council 16 – 36 10/18/2022
Proposal for
Various Environmental Services

Page 30 ends

August 1, 2022
Type: Category I & II
Client: Los Angeles Community College District
Project Involvement: 2020-March 2022
Disclaimer: Mr. Toosi secured this contract and
managed it at his previous role as the vice president
of Rubicon Engineering Corporation. A-Tech still is
Rubicon’s subcontractor and provided services in
collaboration with Mr. Toosi.

Project Description: In 2019, A-Tech as part of the
Rubicon Team was awarded an on-call environmental consulting services contract with the Los Angeles Community College District to provide various environmental services including asbestos and lead sampling and monitoring, limited environmental investigation, and waste characterization investigation.

We have since received multiple task orders and established a working relationship with the Los Angeles City College project team. In 2020, we completed a comprehensive survey of hazardous materials for the Central Plant Phase II renovation project, which assisted the client to comply with requirements of the South Coast Air Quality Management District (SCAQMD) Rule 1403. As a testament to our ability to respond to emergency situations, we conducted and completed an emergency project with short notice and turnaround for the Cesar Chavez Street emergency project. We mobilized to the site with the same day delivery of results, conducted inspection and sampling of a suspected transite pipe, prepared a SCAQMD Procedure 5 Work Plan, oversaw abatement activities, conducted clearance inspection, and provided a close-out letter. Due to the fast-paced nature of this job we completed this project within 20 working days, 10 days of which were spent waiting for the SCAQMD and Cal-OSHA notifications.

In another task order, Mr. Toosi managed and conducted a limited soil investigation project at the Los Angeles City College to evaluate any potential contamination at the proposed Cesar Chavez Admin Building construction site. Our team arranged for mobilization to the site and collected 40 soil samples at various depths and analyzed them for any potential hazardous contaminant groups. Due to the ongoing construction activities the project required faster turnaround time than usual. The College managers were delighted with Mr. Toosi’s responsiveness and quick attention to this project.

Key Personnel: Mr. Toosi was the project manager, Mr. Williams was the HazMat Survey lead, and Dr.

Robles is the risk assessment expert for this contract.

5. On-Call Environmental Consulting Services for Los Angeles Community College District, Los Angeles, CA
Project Spotlight:
 Extensive Environmental Contract
 Government/School District Client
 Hazardous Material Survey
 Construction Monitoring
 On-Call Support and Delivery
 Regulatory Agency Negotiations
 Large Team Coordination
City Council 16 – 37 10/18/2022
Proposal for
Various Environmental Services

Page 31 ends

August 1, 2022
Type: Category II
Client: Veteran Affairs (VA) San Diego Healthcare
System
Project Period: Jul 2020-Nov 2020
Project Description: In July through November
2020, A-Tech performed asbestos and lead project
monitoring at the VA San Diego Healthcare
System. During all phases of the project, A-Tech
coordinated all activities with the abatement contractor and the client. Weekly clearance documentation was sent to the client and relevant hospital personnel.

Routine inspections were performed throughout each shift to ensure that the large containment was secure and free of breaches, and that all work completed by the abatement contractor was performed in accordance with all current regulations. In addition, A-Tech collected air samples outside of the containment to ensure that no asbestos fibers were migrating from the containment. As a result of the careful attention to this project, there were no unnecessary project stoppages. A close-out report was provided to the client after all abatement activities were completed.

Key Personnel: Mr. Williams was the HazMat Survey Lead of this project.

Type: Category II
Client: Santa Ana Unified School District
Project Period: Mar 2022
Project Description: On March 16, 2022, A-Tech
provided consultation to the client during all phases
of the asbestos and XRF-lead assessment. The
scope of work was included testing all materials on
the interior of the library for asbestos and lead. ATech provided verbal results to the client as soon as laboratory results were available. A full assessment report was delivered within three days of A-Tech receiving the laboratory results. This assessment report was immediately stored in Santa Ana USD’s vendor portal, maintained by A-Tech.

6. Asbestos and Lead Project Monitoring and Clearances for Veteran Affairs San Diego Healthcare System, San Diego, CA

7. Asbestos and XRF-Lead Assessment for Edison Elementary School Library of Santa Ana Unified School District, Santa Ana, CA
Project Spotlight:
 Extensive HazMat Surveys
 Government Client
 Monitoring and Clearance
 Weekly Progress Reports
 Air Quality Assessment
 Clearance Documentation
Figure 4: View of
Abatement Activities
Project Spotlight:
 Extensive HazMat Surveys
 Santa Ana Region Experience
 XRF Assessment
 Public Client Agency
 Fast Turnaround
 Education Center
City Council 16 – 38 10/18/2022
Proposal for
Various Environmental Services

Page 32 ends

August 1, 2022
f. REFERENCES
Type: Category I
Client: Baldwin Park Unified School District
Project Name: Phase I & II ESAs for Proposed Early Childhood Care Facility Contact Name: Ray Rankin, Director of Maintenance and Operations Contact Email: [email protected]
Contact Phone: (626) 705-9154
Type: Category I & II
Client: City of Burbank, Public Works Department
Project Name: UST Removal Investigation and Comprehensive Hazardous Material Surveys Contact Name: Dean Pearson, Construction Manager
Contact Email: [email protected]
Contact Phone: (818) 238-3817
Type: Category II
Client: City of Pasadena
Project Name: Comprehensive Asbestos and Lead Assessment Contact Name: Henry Frometa, Human Resources, Safety Coordinator Contact Email: [email protected]
Contact Phone: (626) 744-3818
Type: Category I & II
Client: Los Angeles Community College District
Project Name: Comprehensive Hazardous Material Survey and Limited Environmental Investigation Contact Name: Steve Campos
Contact Email: [email protected]
Contact Phone: (626) 510-4393
Type: Category II
Client: Santa Ana Unified School District
Project Name: Comprehensive Asbestos and Lead Assessment Contact Name: Fentriss Winn
Contact Email: [email protected]
Contact Phone: (760) 717-3077
Type: Category II
Client: Superior Court of California, County of Los Angeles Project Name: Comprehensive Hazardous Materials Surveys Contact Name: Michael Berry, Facilities Services Supervisor Contact Email: [email protected]
Contact Phone: (213) 633-1052
City Council 16 – 39 10/18/2022
Proposal for
Various Environmental Services

Page 33 ends

August 1, 2022

2. SCOPE OF WORK AND SCHEDULE
As part of the RFP, sample fee proposals have been requested for the following properties:
 Project #1: Halladay Property: 2245 S. Halladay Street, Santa Ana, CA 92707  Project #2: Former Arco Gas Station: 2245 S. Main Street, Santa Ana, CA 92707 A-Tech has prepared the following scope of work and schedule of events specific to these two projects and has provided a separate fee proposal in a sealed envelope that corresponds to these activities. Please note that we refrained from repeating our general approach that was explained in Section 1.d and here we focus on specific activities, project background, and schedule of events. It is our assumption that the City of Santa Ana has issued task orders and requested A-Tech two separate cost proposals for conducting ESAs along with Hazardous Material Surveys at above properties. a. PROJECT #1: HALLADAY PROPERTY
It is our assumption that the City of Santa Ana is planning to purchase the subject property (Site) and utilize it as an office building for employees. The Site currently consists of a single-story building in a residential neighborhood. A-Tech is retained to conduct a Phase I ESA and a comprehensive hazardous material survey of the building materials. Below is A-Tech’s systematic approach to this project:

Upon receipt of notice to proceed, A-Tech will
arrange for a kickoff meeting to discuss the
project requirements and obtain project relevant
information. We visited the Orange County
Assessor Office website to find the Assessor
Parcel Number (APN) of 016-105-19. A-Tech
will quickly review the readily available
historical aerial photographs on
https://www.historicaerials.com/ to develop a general understanding of the Site and its vicinity. After the meeting, A-Tech will start preparing the Phase I ESA as described in Section 1.d. For this Phase I ESA we will conduct a site visit, perform an interview with the owner/tenant, subcontract EDR for database research, and generate the final tables and reports. A site visit checklist along with interview questionnaire will be completed and provided as an appendix to Phase I ESA report. EDR results will be presented as appendices to the report.

A-Tech will compile all the findings in a Phase I ESA Report and provide all supporting documents as attachments. The report will provide recommendations for further assessments and environmental requirements of the project. For this project and due to the historical conditions of the Site, A-Tech assumes that the project is completed with a Phase I ESA and no further assessment is required.

Category I: Phase I Environmental Site Assessment
Deliverables:
 Phase I ESA Report
 EDR Reports as Appendices
 Owner Questionnaire as Appendix
 Site Reconnaissance Checklist as Appendix
The detailed cost estimate
for the Phase I ESA of
Halladay Property is
provided in Table B of the
sealed fee proposal envelope.

City Council 16 – 40 10/18/2022
Proposal for
Various Environmental Services

Page 34 ends

August 1, 2022
Table 3. Schedule of Phase I ESA for Halladay Property
# Activity
PreRequisite
Activity
Duration
1 Kickoff Meeting -- 1 Day
2 Site Visit and Interview 1 1 Week
3 Database Review 1 1 Week
4 Report Preparation 1, 2, and 3 3 Weeks
Total Duration 4 Weeks
In case the City plans to conduct any renovation
or construction at the subject property, a
comprehensive hazardous material survey is
needed according to regulatory requirements.

Comprehensive Asbestos Assessment
This assessment will satisfy all the requirements of a pre-renovation assessment, in accordance with CalOSHA Rule Title 8 CCR 1529 and NESHAP/SCAQMD Rule 1403, as it pertains to this project only.

Our certified asbestos consultant or certified site surveillance technician (CAC or CSST) will conduct an inspection of all areas and bulk sampling of suspect asbestos-containing materials (ACM), utilizing AHERA sampling protocols. We will arrange for access to all locations. Our scope includes analysis of suspect ACM samples by a NVLAP accredited laboratory, utilizing Polarized Light Microscopy (PLM) with dispersion staining, in accordance with current regulatory requirements. Sample analysis is based on standard 5 Day Laboratory Analysis. Additionally, we will review the proposed renovation plans, if available. Upon receipt of laboratory results, A-Tech prepares a report that includes sample locations, friability evaluations and remedial recommendations.

Comprehensive XRF-Lead Assessment
A-Tech will also conduct an inspection of all locations and sampling of any suspect lead-containing materials (LCM) via XRF, chip sampling of painted surfaces or bulk sampling of ceramic/porcelain components by a CDPH Certified
Inspector/Assessor or Sampling Technician, utilizing CalOSHA’s and HUD sampling protocols. The analysis of suspect lead bulk samples will be performed by an AIHA accredited laboratory, utilizing Flame Atomic Absorption (AAS) and/or Total Threshold Limit Concentration (TTLC), in accordance with current regulatory requirements. Review of proposed renovation plans, if available. Additionally, we will review the proposed renovation plans, if available.

Upon receipt of laboratory results, A-Tech prepares a report that includes sample locations, condition evaluations and abatement/stabilization recommendations. The following are typical suspect leadcontaining materials found at this type of structure: Ceramic Tile, Painted Surfaces, and Porcelain Sinks & Toilets.

Category II: Comprehensive Hazardous Material Surveys
Deliverables:
 Comprehensive Asbestos Report
 Comprehensive Lead Assessment Report
The detailed cost estimate for
the Hazardous Material
Survey of Halladay Property
is provided in Table C of the
sealed fee proposal envelope.

City Council 16 – 41 10/18/2022
Proposal for
Various Environmental Services

Page 35 ends

August 1, 2022
Table 4. Schedule of Hazardous Material Survey for Halladay Property # Activity Pre-Requisite Activity Duration
1 Fieldwork -- 1 Day
2 Laboratory Analyses 1 5 Days
3 Final Report 2 7 Days
Total Duration 13 Days
b. PROJECT #2: FORMER ARCO GAS STATION
It is our assumption that the City of Santa Ana is planning to purchase the subject property (Site) and utilize it for residential redevelopment. We researched the State Water Resources Control Board’s Database of Environmental Records – GeoTracker, with the Site address to evaluate the Site and its surrounding conditions. A-Tech identified that the Site is a former Arco Gas Station #5147 with a closed cleanup case (GeoTracker Global ID of T0605900621). The Site obtained closure as of March 23, 2022, from the Santa Ana Regional Water Quality Control Board (Water Board). Since 2005 until closure in March 2022, numerous environmental investigations, remediations, and litigations were conducted related to release of petroleum products from historical gas station operations. A-Tech has reviewed these reports and provided a summary of the reports and regulatory activities in Table 5.

For the purpose of this fee proposal and as it is described in the RFP, A-Tech assumes that the City of Santa Ana has retained services of A-Tech for 1) conducting a Phase I ESA of the property, 2) the Phase I ESA will lead to a Phase II ESA in connection with UST removal activities, and 3) a comprehensive hazardous material survey of gas station structures and the shops building.

A Phase I ESA will be prepared in accordance
with the updated ASTM 1527-21 and as
described in Section 1.d. The Phase I ESA for
this project will be in accordance with the
Schedule of Halladay Property project as it is
presented in Table 3. Because of the historical
operations at the Site and the potential leakage from the USTs and gas station activities, it is more than likely that the Phase I ESA conclusion will warrant conducting a Phase II ESA for this property.

Category I: Phase I Environmental Site Assessment
The detailed cost estimate for the Phase I ESA of Former Arco Gas Station is provided in Table D of the sealed fee proposal envelope.

Deliverables:
 Phase I ESA Report
City Council 16 – 42 10/18/2022
Proposal for
Various Environmental Services

Page 36 ends

August 1, 2022
Table 5. Chronological List of Historical Events at the Former Arco Gas Station Document Date Document Type Consultant/Agency Notes
January 05 2005 Request for Dormancy Delta Environmental Consultants Dormancy status (reduces sampling frequency to semi-annual basis/ monitoring to only 3 wells ) rejected due to:

Elevated/Fluctuating Levels of Fuel Oxygenates present in perimeter, Well BH-8 (adjacent to western UST/Dispensers). High concentrations of Benzene in Well BH-2 (former USTs; Southeast boundary) not well defined. Sampling frequency (reduced from quarterly to annually) of Wells BH 1,11,12,13,14, and 18. Sampling frequency (must remain quarterly) for wells BH-6, 10 and remainder of Wells January 27 2005
Quarterly Update Report
Submittal
Delta Environmental Consultants
Report submitted January 27, 2005:

Verbiage for previous quarters update report was incorrectly left in this report. Resubmitted February 7, 2005 January 28 2005
Work Plan for Additional
Groundwater
Assessment
Delta Environmental Consultants
Proposed Scope of Work :

Install a new monitoring well located east/southeast of the former USTs, advance one soil boring BH-19 to a depth of 22 ft bgs and place screen from 5 ft bgs to total depth February 07 2005
Quarterly Update Report
Submittal
Delta Environmental Consultants
Resubmittal correcting previous Quarterly Submittal (4th Quarter 2004) Jan 30, 2005:

Groundwater monitoring conducted (no-purge sampling) December 17, 2004 Analyzed for THG-g, BTEX, MTBE. Groundwater was not collected for Wells BH- 1, 11 through 14, and 18 February 15 2005
Workplan for Additional
Groundwater
Assessment
Santa Ana Water Board
Water Board Approved:

One additional groundwater monitoring will be installed (to delineate lateral extent of high benzene concentrations) in well BH-2 (east-southeast of UST excavation/adjacent residential complex) June 09 2005
Request to Rescind
Additional Groundwater
Assessment
Delta Environmental Consultants
Request to cancel additional work plan implementation because the utility location and geophysical survey conducted on April 21, 2005, concluded the proposed well could not be safely installed. It was requested that alternative site characterization methods to be considered or requirement of additional assessment to be rescinded
May 15 2006
Revised Work Plan for
Additional Ground Water
Assessment
Delta Environmental Consultants
Request to rescind from June 09, 2005 was denied through a phone call conversation on June 22, 2005 Location of BH-19 revised to avoid utility interference August 17 2006
Off-Site Well Installation
Status Report
Delta Environmental Consultants
On July 3, 2006 the proposed location of BH-19 was adjusted because a 12-inch concrete piping was found in the proposed revised location, therefore the well location was moved 3 feet North No detectable concentrations of benzene, toluene, ethylbenzene, total xylenes, MTBE, TBA, DIPE, ETBE, TAME or ethanol were found for the soil collected from BH-19. Soil Sample BH-19-10 has no detectable concentrations of BTEX, MTBE or TBA but had TPH-g concertation of 290 mg/kg July 28 2009 Staff Letter Santa Ana Water Board
Resolution No. 2009-0042 was adopted May 19, 2009 this resolution mandates that agencies reduce quarterly monitoring requirements to a semi-annual basis unless site specific needs warrant otherwise:

Based on evaluation Wells BH 2 through 4, 7 through 9, and 15 through 17 may be reduced to semi-annual sampling schedule
August 31 2011
Work Plan for
Confirmation Soil Borings
Stratus Environmental, Inc.

Proposed advancement and sampling of 3 boring samples (CSB-1 through 3) in the areas of former dispenser island, USTs and product lines.

Samples will be analyzed for Gasoline Range Organics, BTEX, MTBE, DIPE, ETBE, TAME, TBA and ethanol November 10 2011
Revised Workplan for
Confirmation Soil Borings
Stratus Environmental, Inc.

Advancements of proposed soil boring location of August 31, 2011 to a depth of 15 ft Bgs, approximately 5 ft into groundwater.

January 05 2012 Staff Letter Santa Ana Water Board
Approval of Revised Work Plan for Confirmation Soil Borings dated November 16 ,2011 where 3 soil borings be advanced to approximately 15 feet bgs and samples collected from each borehole at 5-foot intervals April 06 2012
Rule 1166 Soil Monitoring
Report
Stratus Environmental, Inc.

Air monitoring conducted during excavation activities during March 3, 2012 where the breaking and removal of asphalt and excavation of pea gravel and soil was conducted.

VOC concentrations were not detected during excavation activities April 30 2012 Quarterly Status Report Stratus Environmental, Inc.

First Quarter 2012 (April 30, 2012):
work performed this quarter- submitted in the Quarterly Monitoring Report, Fourth Quarter 2011 on January 30, 2012. No groundwater samples were collected. Implemented the Revised Work Plan for Confirmation Soil Borings, dated November 10, 2011, on March 15 and 16, 2012 May 14 2012
Confirmation Soil Boring
Report
Stratus Environmental, Inc.

Confirmation of four soil borings to 15 ft bgs (CSB 1 through 4) Elevated concentrations of petroleum hydrocarbons, including benzene, were detected in near surface soils in areas corresponding to both the former tanks and western dispenser area. The highest concentrations of TPH-g, benzene, xylenes, TMBs and naphthalene were encountered in CB-1 (10 feet bgs; southeast corner of site).

Residual hydrocarbons were detected to total depth at all four drill locations July 12 2012 Staff Letter Santa Ana Water Board
Based on the results of the Confirmation Soil Boring Report, agency required air-sparge wells AS-1 and AS-2 to be sampled during next groundwater event, and soil vapor survey and risk assessment to be completed to determine the potential vapor intrusion threat posed by shallow residual contamination February 28 2013 Staff Letter Santa Ana Water Board
Non-compliance, failing to respond to directive, which required that a soil vapor survey and risk assessment to be performed to evaluate the potential threat to human health posed by the elevated residual petroleum hydrocarbons encountered in soils during confirmation sampling.

March 29 2013
Workplan for Shallow Soil
Vapor Survey
Stratus Environmental, Inc.

Response to Non-Compliance by Straus: The newly adopted [at the time] Low-Threat Closure policy states evaluation of the potential petroleum vapor intrusion to indoor air is not required at active commercial petroleum fueling facilities, lithology of subject site indicated release characteristics do not pose a threat to human health. To respond to agency's request, however, Straus will prepare a Work Plan to conduct a risk assessment and a shallow soil vapor survey in general accordance with the DTSC Advisory May 23 2013 Staff Letter Santa Ana Water Board
Work Plan Approved, but all hydrocarbon related compounds with established screening levels must be quantified to sufficiently low limits to allow for comparison against California Human Health Screening Levels (CHHSLs). Due to the very close proximity of adjacent residential structures, the resulting site data must be evaluated under both commercial and residential exposure scenario July 3 2013 Owner Letter Tesoro Refining & Marketing, LLC Responsibility of the Arco Site had transferred from Atlantic Richfield Company to Tesoro Refining and Marketing, LCC effective June 1, 2013
April 30 2014
Workplan for Additional
Site Assessment
Stratus Environmental, Inc.

Two (2) hand-auger borings be advanced in the vicinity of the current and former waste oil tank, in order to collect more detailed information on subsurface conditions near this potential area of concern.

August 22 2014
Additional Site
Assessment Report
Stratus Environmental, Inc.

In order to assess the presence of petroleum hydrocarbons in the vicinity of the existing waste oil tank, two soil borings (HA-1 and HA-2) were advanced and results were presented.

October 30 2014
Determination of
Eligibility for Closure
Santa Ana Water Board
Regional Board staff has determined this environmental cleanup case eligible for site closure. Groundwater monitoring and sampling activities may be reduced to an annual frequency (performed 2nd Quarter) pending site closure
May 7 2019
Work Plan for Soil
Borings and Product
Piping Sampling
Stratus Environmental, Inc.

Work Plan to perform additional soil sampling associated with the removal of the underground storage tanks (USTs), waste oil tank, hydraulic hoist, fuel dispensers and product piping.

Sampling of fourteen soil borings associated with USTs, waste oil tank, and hydraulic lifts and the collection of soil samples along the product piping and fuel dispensers September 6 2019 Well Destruction Report Stratus Environmental, Inc.

Destruction of eleven onsite groundwater monitoring wells (BH-1 through BH-4, BH-6, BH-8, and BH-13 through BH-17) and two onsite dual nested air-sparge wells (AS-1 and AS-2) The wells were removed to facilitate site demolition associated with the City of Santa Ana’s street widening project January 23 2020
Revised Review
Summary Report –
Concur with Closure
State Water Resources Control
Board
Communications on October 8 and 21, 2019 and January 7, 2020 between Regional Water Board staff and State Water Board staff, the following scope was discussed and agreed upon: The Site meets LTCP criteria for current commercial land use, It is reasonable to re-evaluate Site conditions against the Policy when the future property use has been determined, Responsible party should contact the Department of Water Resources to confirm/verify the location of the supply well, supposedly located less than 500 feet east of the Site.

May 6 2020
Concurrence of Site
Closure Recommendation
& Cancellation of Annual
Groundwater Sampling
Stantec Consulting Services Inc.

Evaluated nearby water-supply wells and confirmed that the wells do not exist. No further groundwater sampling of the six off-site street groundwater monitoring wells was needed May 4 2021
Notification of Case
Closure
Santa Ana Water Board
Based on available data, the gasoline contamination in soil and/or groundwater beneath the site appears to have been adequately assessed and mitigated and environmental case closure may be appropriate at this time.

September 9 2021
Well Destruction
Directive
Santa Ana Water Board
Removal and/or abandonment of all wells and other site improvements related to the underground storage tank cleanup must be done before a final case closure summary November 23 2021 Well Destruction Report Stantec Consulting Services Inc.

The destruction of six off-Site groundwater monitoring wells (BH-7, BH-9 through BH-12, and BH-18) performed November 8 through 10, 2022
March 23 2022
Closure Letter and Final
Case Summary
Santa Ana Water Board
Agency finds that the site investigation and corrective action carried out at the above-referenced UST site is in compliance with the requirements and with corrective action regulations set and that no further action related to the petroleum releases(s) at the site is required.

City Council 16 – 43 10/18/2022
Proposal for
Various Environmental Services

Page 37 ends

August 1, 2022
Background, Proposed Scope of Phase II ESA
From review of the Site documents available on
GeoTracker, A-Tech assumes that the Site
features include three 12,000-gallon, doublewalled, fiberglass gasoline USTs, one 500-gallon double walled, fiberglass waste oil UST, and their
associated hydraulic hoists dispensers and
associated product lines, and vent lines. The Site
is a rectangle with approximate dimensions of 80
by 120 feet. Based on this information, A-Tech
is planning for two borings per 12,000-gallon
UST area, one boring for the 500-gallon UST
area, and three borings at each 20 linear feet of
piping. Historically, groundwater is encountered at approximately 10 feet bgs at or near the Site vicinity. The chemicals of potential concern (COPCs) at the Site include Total Petroleum Hydrocarbon (TPH), and Volatile Organic Compounds (VOCs). Due to potential use and storage of lead-containing gasoline, A-Tech also recommends Title 22 metals to be included as the COPCs.

A total of ten (10) borings will be advanced using a hydraulic direct-push technology (DPT) drilling rig.

The soil will be logged using the Unified Soil Classification System (USCS). Borings will be advanced to a maximum of 20 feet bgs and soil samples will be collected starting at 1.0 feet bgs and repeated at 5.0,

10.0, 15.0, and 20.0 bgs. Because of the shallow groundwater, samples will be collected in borings where groundwater is encountered using hydropunch valves. In addition, we will install soil vapor probes at 5.0 and 15.0 ft bgs at three selected borings and collect six soil vapor samples with summa canisters. The soil samples will be collected in acetate-lined sleeves capped with Teflon© tape and airtight plastic caps. The samples will be packed in ice and transported to a State-Certified laboratory for analysis, with proper Chain-of-Custody documentation. All work will be performed under the oversight of a state of California certified Professional Engineer. Field Quality Assurance/Quality Control (QA/QC) measures include collecting field duplicate samples, equipment blank at the end of the day, and one trip blank for sample transports. All discrete samples collected at 1.0, 5.0, and 10.0 feet bgs will be initially analyzed for VOCs by EPA Method 8260B, Title 22 metals by EPA Method 6010B, and TPH by EPA Method 8015.

The soil vapor samples will be analyzed for VOCs using EPA Method TO-15. Groundwater samples will also be analyzed for the same COPCs. Samples at 15.0, and 20.0 feet bgs will be placed on hold for further analyses if initial shallow samples return at an elevated level.

Work Plan and Pre-Field Activities
A-Tech will conduct this Phase II ESA in accordance with procedures set forth in Section 1.d of this proposal. A-Tech will prepare a work plan for the scope described above and in accordance with ASTM E1903-19. After review of the work plan by the City, it is submitted to the Water Board for approval before implementation. Additionally, a project-specific Health and Safety Plan (HASP) will be developed outlining the various hazards associated with the proposed scope of work. Because the borings will potentially reach to the groundwater, A-Tech will obtain a Well Construction, Well Destruction, Test and Exploratory Hole permit from the Orange County Health Care Agency. The permit processing Category I: Phase II Environmental Site Assessment
Deliverables:
 Work Plan for Field Activities
 Health & Safety Plan (HASP)
 Orange County Boring Permit Application
 Geophysical Survey
 Field Daily Report
 Phase II ESA Report
 Cost Proposal for Remediation Activities
 Cost Allocation and Responsible Parties
City Council 16 – 44 10/18/2022
Proposal for
Various Environmental Services

Page 38 ends

August 1, 2022
usually takes up to 10 business days, but we can expedite the process by paying the expedited fees, if needed.

We will notify the Underground Service Alert (USA Dig-Alert) at least 48 hours prior to any field mobilization, so utilities may mark their subsurface conduits on and adjacent to the Site. A geophysical survey will be conducted at the subject property to determine the location, if any, of subsurface utility conduits where soil borings will be advanced. The locations of the soil borings will be placed away from any subsurface conduits marked by USA or located by the private subsurface location company hired by A-Tech. The boring will be marked by white paint, visible for USA and the geophysical crew.

A-Tech prepares the scope of the work that will be performed by subcontractors (drillers, geophysics, and laboratories) and requests three subcontractors to bid on. A-Tech recommends the most qualified subcontractor to the City for approval. A-Tech enters into a subcontract agreement with the selected contractor and requires the subcontractor to fulfill the insurance requirements of the City and A-Tech’s stringent health and safety requirements.

Work Plan Implementation
Prior to starting the field work, the City and appropriate regulatory oversight agency will be notified in case inspection is required. A copy of the work plan and health and safety plan will be available on the field. All subcontractors will be required to follow health and safety requirements including their own and any requirements imposed by the City. Daily health and safety briefing will be performed prior to any field work. Daily progress reports will be sent to the City’s designated project manager. The laboratory results will be on normal turnaround time, which is 5 days.

Data Evaluation and Reporting
Upon receipt of analytical data, A-Tech performs an evaluation and interpretation of the data in the context of the regulatory screening levels and guidance provided by the EPA, DTSC, and Santa Ana RWQCBs. The findings determine which of the following course of action is required:
“No further action needed; in which case the report will request site closure; Additional investigation is needed to further delineate the extent of Chemicals of Potential Concern (COPCs); or Investigation is completed but remediation is required.” A-Tech prepares a draft report for review by the City and after addressing the comments, the report is suitable for submitting to the regulatory agencies. If further assessment is recommended or remediation is warranted, a cost proposal will be prepared and accompany the recommendations. Potential responsible parties (PRPs) for contamination will be determined and we will discuss viable options for incurring the cost from the PRPs.

The detailed cost estimate for the Phase II ESA of Former Arco Gas Station is provided in Table E of the sealed fee proposal envelope.

City Council 16 – 45 10/18/2022
Proposal for
Various Environmental Services

Page 39 ends

August 1, 2022
Table 6. Schedule of Phase I & II ESAs for Former Arco Gas Station # Activity Pre-Requisite
Activity Duration
1 Kickoff Meeting -- 1 Day
2 Phase I ESA 1 4 Week
3 Phase II ESA Work Plan & HASP 2 2 Week
4 Phase II ESA Permitting 2 10 Days
5 Phase II ESA Pre-Field Activities 1 1 Week
6 Phase II ESA Work Plan Implementation 3, 4, and 5 1 Day 7 Phase II ESA Laboratory Turnaround 6 5 Days
8 Phase II ESA Data Evaluation and Reporting 7 3 Weeks
Total Duration from Phase I to Phase II ESA Completion 12 Weeks A-Tech will conduct a comprehensive asbestos
and lead assessment of the building materials at
the subject property. For the purposes of this
proposal, A-Tech assumes that there is a gas
station shop and its associated structures at the
subject property. A-Tech’s scope of services is
similar of what is discussed for the Halladay Property and follows the exact schedule of events as described in Table 4.

Category II: Hazardous Material Surveys
The detailed cost estimate for the Hazardous Material Survey of Former Arco Gas Station is provided in Table F of the sealed fee proposal envelope.

Deliverables:
 Comprehensive Asbestos Report
 Comprehensive Lead Assessment Report
City Council 16 – 46 10/18/2022

EXHIBIT B
City Council 16 – 47 10/18/2022
HQ: 1640 N. Batavia Street, Orange, CA 92867; Phone: (714) 434-6360 Website: www.atechinc.net Mr. Kenny Nguyen August 1, 2022
Project Manager, City of Santa Ana
Public Works Agency; M-36
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701

ORIGINAL
Fee Proposal for RFP No. 22-090
Various Environmental Services
Category I & II
Dear Mr. Nguyen:

As requested in the Request for Proposal (RFP) No 22-090, A-Tech provides this Fee proposal in accordance with the requirements of the RFP and the Sample Fee Proposal projects. Tables A through F summarizes our cost proposal for this project:
 Table A.1: Schedule of Rates for Category I: Phase I & II ESAs  Table A.2: Schedule of Rates for Category II: Hazardous Material Surveys  Table B: Sample Cost Proposal for Phase I ESA of Halladay Property  Table C: Sample Cost Proposal for HazMat Survey of Halladay Property  Table D: Sample Cost Proposal for Phase I ESA of Former Arco Gas Station  Table E: Sample Cost Proposal for Phase II ESA of Former Arco Gas Station  Table F: Sample Cost Proposal for HazMat Survey of Former Arco Gas Station We believe that we provided the most competitive rates while delivering ultimate quality. The rates will be in effect for the duration of the contract. If you have any questions or require clarifications, please do not hesitate to contact us.

Respectfully submitted,
A-Tech Consulting, Inc.

Roohi Toosi, PE Casandra Williams, CAC, DPH
Director of Engineering Chief Executive Officer
City Council 16 – 48 10/18/2022
Tables
City Council 16 – 49 10/18/2022
Job Classifications
Personnel Rate
($)
Project Manager $200.00
Health & Safety Director $215.00
Risk Assessment Expert $180.00
Senior Engineer/ Geologist/ Scientist $140.00
Project Engineer/ Geologist/ Scientist $125.00
Staff Engineer/ Geologist/ Scientist $110.00
Field Technicians $105.00
CAD & GIS Technicians $100.00
Admin Support & Editor $80.00
Table A.1: Schedule of Rates for Category I: Phase I & II ESAs City Council 16 – 50 10/18/2022
2022 A-Tech Fee Schedule

Page 1 of 3 ends

1640 N. Batavia Street, Orange, CA 92867
Phone (714) 434-6360 Fax (714) 221-6360
Web Address: www.atechinc.net
Disciplines
Certified Industrial Hygienist (CIH) $215.00/Hour
Professional Engineer $195.00/Hour
Principal Hygienist $165.00/Hour
Certified Environmental Infection Control Consultant (CEICC) $150.00/Hour Certified Indoor Environmental Consultant (CIEC) $150.00/Hour Environmental Project Manager $130.00/Hour
Certified Asbestos Consultant (CAC) $130.00/Hour
Certified Site Surveillance Technician $105.00/Hour
CDPH Certified Project Monitor $105.00/Hour
CDPH Certified Inspector/Assessor $105.00/Hour
Trained Mold Inspector $105.00/Hour
Trained Mold Project Monitor $105.00/Hour
Report Preparation & Administrative $80.00/Hour
Note: All the above rates are fully encumbered, unless otherwise specified.

Shift Rates
Clearances - (includes up to 4 standard on-site PCM asbestos air samples) Weekday (Mon – Fri) $625.00/visit
Weeknight (6pm – 6am) $725.00/visit
Saturday $725.00/visit
Sunday $850.00/visit
Emergency Response – Weeknight/Saturday $800.00/visit
Emergency Response - Sunday $950.00/visit
Project Monitoring - (includes up to 8 standard on-site PCM asbestos air samples) Weekday (Mon – Fri) $1,250.00/shift
Saturday $1,400.00/shift
Sunday $1,600.00/shift
Note: All samples analyzed at a certified laboratory will be charged at the applicable per-sample rate.

Report Rates:

Procedure 5 Work Plan, Asbestos, Lead or Mold Scope of Work $950.00/report Asbestos or Lead Operation and Maintenance Plans $850.00/report Silica Exposure Control Plans $850.00/report
Asbestos Samples
Bulk – Polarized Light Microscopy
Standard Turn-Around (5 Days) $15.00/sample
Expedited Turn-Around (3 Days) $21.00/sample
Accelerated Turn-Around (24 Hour) $25.00/sample
Rush Turn-Around (6 Hours) $30.00/sample
Rush Turn-Around (3 Hours) $35.00/sample
Bulk – Point Counting (PLM) 1,000 points
Standard Turn-Around (5 Days) $120.00/sample
Expedited Turn-Around (3 Days) $135.00/sample
Accelerated Turn-Around (24 Hour) $180.00/sample
Rush Turn-Around (3 Hours) $270.00/sample
City Council 16 – 51 10/18/2022
2021 General Fee Schedule
Sample Analysis

Page 2 of 3 ends

1640 N. Batavia Street, Orange, CA 92867
Phone (714) 434-6360 Fax (714) 221-6360
Web Address: www.atechinc.net
Air – Phase Contrast Microscopy (PCM)*
Standard Turn-Around (5 Days) $15.00/sample
Expedited Turn-Around (3 Days) $15.00/sample
Accelerated Turn-Around (24 Hour) $15.00/sample
Rush Turn-Around (3 Hours)* $20.00/sample
* - Analysis available on site.

Air – Transmission Electron Microscopy (TEM-AHERA)
Standard Turn-Around (5 Days) $80.00/sample
Expedited Turn-Around (3 Days) $100.00/sample
Accelerated Turn-Around (24 Hour) $140.00/sample
Surface – Wipe or Microvac – Quantitative (TEM-ASTM D5755) Standard Turn-Around (5 Days) $180.00/sample
Expedited Turn-Around (3 Days) $200.00/sample
Accelerated Turn-Around (24 Hour) $260.00/sample
Rush Turn-Around (6 Hours) $320.00/sample
Nuisance Dust Samples
Air – Total Particulates (NIOSH 0500)
Standard Turn-Around (5 Days) $28.00/sample
Expedited Turn-Around (3 Days) $35.00/sample
Accelerated Turn-Around (24 Hour) $38.00/sample
Air – Respirable Particulates (NIOSH 0600)
Standard Turn-Around (5 Days) $28.00/sample
Expedited Turn-Around (3 Days) $35.00/sample
Accelerated Turn-Around (24 Hour) $38.00/sample
Lead Samples
Chip, Wipe, Air, Soil – Atomic Absorption Spectrometry (AAS) Standard Turn-Around (5 Days) $17.00/sample
Expedited Turn-Around (3 Days) $20.00/sample
Accelerated Turn-Around (24 Hour) $25.00/sample
Rush Turn-Around (3 Hours) $70.00/sample
Ceramic Tile Samples (TTLC)
Standard Turn-Around (5 Days) $50.00/sample
Expedited Turn-Around (3 Days) $58.00/sample
Accelerated Turn-Around (24 Hour) $70.00/sample
X-Ray Fluorescence (XRF) Analysis
On-Site Analysis $475.00/day
City Council 16 – 52 10/18/2022
2021 General Fee Schedule
Sample Analysis

Page 3 of 3 ends

1640 N. Batavia Street, Orange, CA 92867
Phone (714) 434-6360 Fax (714) 221-6360
Web Address: www.atechinc.net
Mold and Bacteria Samples
Non-Viable – Air – Spore & Pollen Identification (count/M3) Standard Turn-Around (5 Days) $68.00/sample
Expedited Turn-Around (3 Days) $78.00/sample
Accelerated Turn-Around (24 Hour) $95.00/sample
Rush Turn-Around (3 Hours) $115.00/sample
Non-Viable – Surface (Tape-Lift, Swab/Bulk) – Qualitative Identification Standard Turn-Around (5 Days) $68.00/sample
Expedited Turn-Around (3 Days) $78.00/sample
Accelerated Turn-Around (24 Hour) $95.00/sample
Rush Turn-Around (3 Hours) $115.00/sample
Bacteria – Sewage Screen Swab – Qualitative Identification Expedited Turn-Around (48 Hour) $190.00/sample
Rush Turn-Around (28 Hour) $230.00/sample
Bacteria – Adenosine Triphosphate (ATP) Luminometer
On-Site Analysis $60.00/sample
Environmental Soil Sample Analysis
Method(s) Compounds 5-day
TAT
3-day
TAT
2-day
TAT
1-day
TAT
6010B/7471A Title 22 Metals $150 $202.50 $225 $300
8015B/5035 TPH gas $60 $81 $90 $120
8015B TPH diesel/oil $90 $122 $120 $135
8260B/5035 VOCs + oxys $142.50 $195 $215 $285
5035 Kit For Soil Sampling (VOCs) $30 $30 $30 $30
8270C SIM PAHs $187.50 $255 $282 $375
8151A Herbicides $195 $265 $295 $390
8081A Organochlorine Pesticides $150 $155 $170 $225
8141A Organophosphorus
Pesticides
$165 $225 $250 $330
City Council 16 – 53 10/18/2022
Personnel Project
Manager CIH Senior Level Staff
Project
Level Staff Staff Level
Rate (hr) $200.00 $215.00 $140.00 $125.00 $110.00
1 1. Phase I Environmental Site Assessment
2 Record Research and Review/Reporting 2 0 4 0 12 $0.00 $2,280.00 3 Database Search and Radius Map Reports 0 0 0 0 2 $650.00 $870.00 4 Site Reconnaissance and Interviews 0 0 0 0 6 $0.00 $660.00 5 Subtotal $400.00 $0.00 $560.00 $0.00 $2,200.00 $650.00 $3,810.00 6 Total Billed Per Classification for One Phase I ESA $400.00 $0.00 $560.00 $0.00 $2,200.00 -- -- 7 Total Number of Hours for Phase I ESA 2 0 4 0 20 -- 26 8 $3,810.00
Notes:
1) Expenses refer to Database Search and Radius Map Reports that will be subcontracted.

Total Cost for Phase I ESA of Halladay Property
Table B. Sample Cost Proposal for Phase I ESA of Halladay Property # Task/Activities
Cost per Task
Number of Hours/Subtotal
Expenses(1)
City Council 16 – 54 10/18/2022
City Council 16 – 55 10/18/2022
Personnel Project
Manager CIH Senior Level Staff
Project
Level Staff Staff Level
Rate (hr) $200.00 $215.00 $140.00 $125.00 $110.00
1 1. Phase I Environmental Site Assessment
2 Record Research and Review/Reporting 2 0 4 0 16 $0.00 $2,720.00 3 Database Search and Radius Map Reports 0 0 0 0 2 $650.00 $870.00 4 Site Reconnaissance and Interviews 0 0 0 0 6 $0.00 $660.00 5 Subtotal $400.00 $0.00 $560.00 $0.00 $2,640.00 $650.00 $4,250.00 6 Total Billed Per Classification for One Phase I ESA $400.00 $0.00 $560.00 $0.00 $2,640.00 -- -- 7 Total Number of Hours for Phase I ESA 2 0 4 0 24 -- 30 8 $4,250.00
Notes:
1) Expenses refer to Database Search and Radius Map Reports that will be subcontracted.

Total Cost for Phase I ESA of Halladay Property
Table D. Sample Cost Proposal for Phase I ESA of Former Arco Gas Station # Task/Activities
Cost per Task
Number of Hours/Subtotal
Expenses(1)
City Council 16 – 56 10/18/2022
Personnel Project
Manager CIH Senior Level Staff
Project
Level Staff Staff Level Field
Technician

CAD/GIS
Tech
Rate (hr) $200.00 $215.00 $140.00 $125.00 $110.00 $105.00 $100.00 1 Task 1 – Work Plan, HASP, and Agency Notifications
2 Work Plan and HASP Preparation 1.0 1.0 2.0 0 12 0 4 -- -- -- $2,415.00 3 Subtotal $200.00 $215.00 $280.00 $0.00 $1,320.00 $0.00 $400.00 -- -- -- $2,415.00 4 Task 2 – Field Oversight and Sampling
5 UST Removal Oversight 2 0 0 0 0 10 0 -- -- -- $1,450.00 6 Lab Cost (2) (TPH, Metals, and VOCs assuming 30 samples) -- -- -- -- -- -- -- -- 1 $12,500.00 $12,500.00 7 Geophysics -- -- -- -- -- -- -- -- 1 $700.00 $700.00
8 Drillers Cost -- -- -- -- -- -- -- -- 1 $3,500.00 $3,500.00 9 Subtotal $400.00 $0.00 $0.00 $0.00 $0.00 $1,050.00 $0.00 -- -- -- $18,150.00 10 Task 3 – Report Preparation
11 Report Preparation and Data Evaluation 1 1 8 0 24 0 0 -- -- -- $4,175.00 12 Subtotal $200.00 $215.00 $1,120.00 $0.00 $2,640.00 $0.00 $0.00 -- -- -- $4,175.00 13 Total Labor Cost $800.00 $430.00 $1,400.00 $0.00 $3,960.00 $1,050.00 $400.00 -- -- -- $8,040.00 14 Total Number of Hours 4 2 10 0 36 10 4 -- -- -- 66
15 $16,700.00
16 $24,740.00
Notes:
1) Expenses refer to subcontractor costs, laboratory analysis, equipment, materials, and other project related direct costs. 2) For lab cost A-Tech assumed that initially total of 30 samples (1-, 5-, and 10-foot samples from 10 borings) will be analyzed for Metals, TPH, and VOCs as described in the proposal.

The unit cost of these analyses is provided in Table A.2 Total Project Cost
Total Expenses
# Task/Activities
Number of Hours/Subtotal
Unit Rate Quantity Cost
Expenses
(1)
Table E: Sample Cost Proposal for Phase II ESA of Former Arco Gas Station Cost per Task
City Council 16 – 57 10/18/2022
City Council 16 – 58 10/18/2022
City Council 16 – 59 10/18/2022
City Council 16 – 60 10/18/2022
City Council 16 – 61 10/18/2022
City Council 16 – 62 10/18/2022
City Council 16 – 63 10/18/2022
City Council 16 – 64 10/18/2022
City Council 16 – 65 10/18/2022
City Council 16 – 66 10/18/2022
City Council 16 – 67 10/18/2022
City Council 16 – 68 10/18/2022
Waiver Of Subrogation (Blanket) Endorsement
INCL
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

Commercial General Liability Coverage Part
Transfer Of Rights Of Recovery Against Others To Us Condition City Council 16 – 69 10/18/2022
City Council 16 – 70 10/18/2022
City Council 16 – 71 10/18/2022

ANY PERSON OR ORGANIZATION YOU ARE REQUIRED TO WAIVE YOUR RIGHTS OF

RECOVERY IN A WRITTEN CONTRACT, AGREEMENT OR PERMIT WITH THE NAMED INSURED.

City Council 16 – 72 10/18/2022
City Council 16 – 73 10/18/2022
City Council 16 – 74 10/18/2022
City Council 16 – 75 10/18/2022

EXHIBIT A

SCOPE OF SERVICES
City Council 16 – 76 10/18/2022

REQUEST FOR PROPOSALS (RFP)
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO.: 22-090

CITY OF SANTA ANA
Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Kenny Nguyen
Project Manager
(714) 647-5632 Office
[email protected]

KEY RFP DATES (Subject to change at discretion of City):

Issue Date: June 30, 2022
Deadline for Requests for Information: July 19, 2022
Proposal Due Date: August 01, 2022 at 2pm
Projected Award Date: Fall 2022
City Council 16 – 77 10/18/2022
City of Santa Ana RFP 22-090
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO. 22-090

INTRODUCTION/PROJECT BACKGROUND
The City of Santa Ana is issuing this Request for Proposals (RFP) to seek qualified firms to provide Various Environmental Services for the City of Santa Ana Public Works Agency on an as-needed or “on-call” basis. From the proposals received, it is the City’s goal to select up to three (3) firms. The City will enter into separate agreements with each firm for an aggregate not to exceed amount of
It is the City’s goal to select one or more firms to enter into an agreement(s) with to provide as needed property management services for capital improvement projects (CIP). The capital improvement projects needing the right-of-way services include, but are not limited, to Warner Avenue, Bristol Street, Fairview Street, and Grand Avenue Street Improvements.

Specialty Areas Maximum Contract
Aggregate Amount
I Environmental Site Assessment $135,000
II Hazardous Materials Surveys $135,000
Consultants are encouraged to prepare proposals for the multiple specialty areas listed above, however; it is not required to propose on more than one Specialty Area. Each Specialty Area shall be submitted individually in response to the RFP. From the proposals received, it is the City’s goal to select one to two firms for each of the specialty services (I and II). The City will enter into separate agreements (the “Agreement”) with each of these firms. Work will be assigned by Contract Task Orders. As tasks are identified, they will be distributed among these firms based upon their ability to perform the required work within the project schedule and budget constraints.

A detailed scope of work and corresponding fee will be outlined when a specific task is assigned to a consultant. The City reserves the right to distribute the work in any manner which will best serve the City’s interests.

MINIMUM QUALIFICATIONS
City Council 16 – 78 10/18/2022
City of Santa Ana RFP 22-090
Page A1-2
Consultants must demonstrate the minimum qualifications as established in the California Department of Transportation (Caltrans) Right of Way Manual, which can be accessed at:
http://www.dot.ca.gov/hq/row/rowman/manual/index.htm.

Consultants must demonstrate ability to have successfully negotiated and closed escrow on acquisition of parcels and minimized the eminent domain process on similar projects.

DESCRIPTION OF WORK
Consultants under contract with the City of Santa Ana will provide support to City of Santa Ana staff or their designee on an as-needed basis. The Consultants shall be thoroughly familiar with the Statement of Work prior to submitting a response to this Request for Proposal (RFP).  The Consultant shall perform work to produce a high quality, professional and complete work product.
 Consultant must have experience with State and Federally funded projects. All work shall be performed in conformance with all applicable regulations, policies, procedures and standards.
 Work may include, but is not be limited to, the following:
o onsite review of the project area
o review of existing records
o conducting research and pre-demolition surveys
o performing analysis
o information gathering
o collect site samples
o lab testing and evaluation for the potential presence and extent of contaminants/hazardous materials
o preparing reports documenting all sampling activities o analytical results and recommendations for future action o providing cost estimates for the recommended actions
o attend community meetings as needed
 The Consultant shall carry out the instructions received from the City and shall cooperate with the City and other agencies.
 The Consultant has total responsibility for the accuracy and completeness of the work produced. The work will be reviewed by the City for conformity with the requirements of the Agreement. Reviews by the City may NOT include a detailed review for the accuracy of items submitted. The responsibility for accuracy and completeness of such items remains solely that of the Consultant.
 The Consultant shall be responsible for coordination and supervision of all work performed by its sub-consultants. The Consultant shall review all work performed by its sub-consultants and the responsibility for accuracy and completeness of work performed remains solely that of Consultant. Sub-consultant markup is not allowed in this contract.  The Consultant shall have a Quality Control Plan in effect during the entire time work is being performed under the Agreement. The Quality Control Plan shall establish a process City Council 16 – 79 10/18/2022
City of Santa Ana RFP 22-090
Page A1-3
whereby work products are independently checked, corrected and back checked. All project related correspondences and documents shall be maintained and bound in appropriate project files. Additionally, all electronic files shall conform to the City’s file naming system.
 The Consultant shall diligently work on each assignment and complete each task in accordance with the schedule and accommodate the City’s needs.  The Consultant’s work will be subject to inspection and audit by City, County, State and Federal representatives
 Consultant’s Project Manager and critical staff must attend the monthly meetings with City Staff and other consultants requested by the City to review project progress, the schedule and any critical issues/items and the follow up action items necessary. All status reports must be submitted ahead of the meetings.
 Consultant must prepare a Weekly Status report and submit to the City. Format and specific items of each status report must be reviewed and approved by the City.  Consultant must maintain electronic files of all the project parcels and correspondence including all reports generated by other related consultants required to perform acquisition/relocation and property management services.  All electronic submittals of files must be through a shared folder. Consultant must upload and keep current the project parcel information and files in the shared folder established for the project.
 Consultant must prepare electronic files of the parcels according to the Caltrans Review Process for right-of-way Certification.
 Project files including copies of all correspondences, reports, documents, and electronic files shall be submitted to the City when requested and electronically updated as requested by the City.
 All work, including reports, analysis, data, and intellectual properties developed during the life of the Agreement shall become the properties of the City.  The Consultant will receive written notification of the award of the contract. Upon such notification, the Consultant will proceed with the services required by the Agreement.

PAYMENT AND INVOICING:

Selected Consultant shall invoice the City based on time and material according to the City’s standard invoice template. Tasks and hours shall be clearly identified and all rates must match those included in the approved agreement. City shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

Each invoice must include a Consultant Progress Report that contains tasks and activities completed and summary of work in the next month period. Certificate of insurance must be current in order for invoices to be processed.
(I) ENVIRONMENTAL SITE ASSESSMENT
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include City Council 16 – 80 10/18/2022
City of Santa Ana RFP 22-090
Page A1-4
but not limited to:
 Investigate the historical uses of the projects site by examining available historical aerial photographs, topographic maps, Environmental Data Resources (EDR radius shall be at least one mile from the project limits) and other available documentation for evidence of potential environmental concerns (both surface and subsurface) associated with prior land uses.
 Interview the current and former owners and occupants of the properties and other knowledgeable persons (including adjacent residents/occupants, as well as applicable local government officials) to identify historical operations conducted on the project site and adjacent properties.
 Research and investigate area for geology and subsurface/surface potential for pollutant transport from public sources.
 Prepare Phase I ESA report detailing the findings through inspections and interviews, site characteristics, record and historical review information and potential contamination issue, interpretation of the findings and recommendations for any work required.

Phase II Environmental Site Assessment
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include but not limited to:
 Collect soil and water samples of the project site.
 Conduct subsurface soil borings.
 Perform geophysical testing for buried/underground storage tanks and drums.  Install groundwater monitoring well and analyze the presence of contamination. Depending on the results of the samples, additional site investigation and potential remedial actions may be required.  Prepare Phase II ESA report detailing the compilation and analysis of the data collected, interpretation of the findings and recommendations for any work required.  Coordinate with local government officials and/or contractor to conduct the necessary sample collection, submit the required forms/reports and obtain the complete hazardous closure certification.
(II) HAZARDOUS MATERIALS SURVEYS
Pre-demolition Hazardous Materials Surveys
Consultant shall perform pre-demolition survey for hazardous and contaminated building materials. These tasks shall include but not limited to:
 Perform the necessary hazardous materials survey (including but not limited Asbestos and Lead Based Paint) and collect bulk samples to identify and quantify all potential hazardous, contaminated, or other materials, including materials and abandoned or waste materials, which may be regulated or otherwise require special consideration or disposal arrangements during, or prior to, demolition of the building.
 Prepare the Asbestos-Containing Materials (ACM), Lead Based Paint (LBP), Universal Waste and any other necessary survey reports to comply with State and Federal requirements.

CITY RESPONSIBILITIES:

City Council 16 – 81 10/18/2022
City of Santa Ana RFP 22-090
Page A1-5
The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein.
 Facilitate meeting spaces and coordination with City staff  Access to City facilities
CONSULTANT RESPONSIBILITIES:
 Provide all required insurance as outlined in Attachment 2 of this RFP.  Submit renewal of Certificate of Insurance 30 days before expiring.  Ensure Certificate of Insurance is current when submitting invoices.

SPECIAL REQUIREMENTS (ATTACHMENT 4)
This project may utilize California Department of Transportation (Caltrans) funds and shall therefore comply with all state and federal requirements. The below referenced forms included in Attachment 4 (Additional Provisions) of the Appendix must be completed in their entirety and submitted with your proposal:
 LAPM Exhibit 10-H: Sample Cost Proposal
 LAPM Exhibit 10-O1: Consultant Proposal DBE Commitment  LAPM Exhibit 10-O2: Consultant Contract DBE Commitment (include within Fee Proposal hard copy package)
 LAPM Exhibit 10-K: Consultant Certification of Contract Costs and Financial management System (include within Fee Proposal hard copy package) for Speciality Area A only.

Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf COMPLIANCE WITH REQUIREMENTS OF FUNDING AGENCY:

This agreement may be funded with state and/or federal grant funds administered by Caltrans.

Proposer shall comply with all requirements as they pertain to the use of these funds. Refer to Attachment 4 for Caltrans required forms, including Exhibit 10-H – Sample Cost Proposal (H2 for On-Call Contracts) in the Appendix of this RFP.

DISADVANTAGED BUSINESS ENTERPRISES (DBE) GOAL:

The Agency has established a DBE goal for this Contract. Proposers are encouraged to obtain DBE participation for this contract. Refer to Exhibit 10-I – Notice to Proposers DBE Information included in the Appendix of this RFP. Proposers must submit Exhibits 10-O1 & 10-O2 – Consultant Proposal & Contract DBE Commitment to demonstrate compliance with Agency’s DBE goal.

City Council 16 – 82 10/18/2022
City of Santa Ana RFP 22-090
Page A1-6
CONSULTANT AUDIT AND REVIEW PROCESS:
(Speciality Area A - Acquisition/Relocation only)
Prior to contract award and dependent on contract award amount, the selected Consultant(s) shall be subject to an audit or review by Caltrans’ Audit and Investigations (A&I), other state audit organizations, or the federal government. The selected Consultant(s) shall complete Exhibit 10-K – Consultant Annual Certification of Indirect Costs and Financial Management System for all prime and sub-consultants in the Appendix of this RFP.

To independently download any of the Caltrans Exhibits required per this RFP, visit:
https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms City Council 16 – 83 10/18/2022

TECHNICAL PROPOSAL

VARIOUS ENVIRONMENTAL SERVICES

CITY OF SANTA ANA
JULY 26, 2022
27372 Calle Arroyo/ San Juan Capistrano, California 92675 City Council 16 – 84 10/18/2022 Various Environmental Services i
Cover Letter
July 26, 2022
Kenny Nguyen
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, California 92701
Subject: Various Environmental Services
Dear Mr. Nguyen,
The City of Santa Ana (City) requires a qualified environmental consulting firm to provide Environmental Site Assessments (ESAs) and Hazardous Material Surveys for a variety of Capital Improvement Projects.

Dudek is well versed in the scope of services included in the Request for Proposal (RFP) and has extensive experience providing on-call consulting services to clients, including municipalities, that are acquiring, redeveloping, and/or responsible for contaminated and potentially contaminated properties.

Firm Overview. Founded in Encinitas, California in 1980, Dudek is an employee-owned environmental and consulting firm. We assist public and private clients on a broad range of projects to improve California’s communities, infrastructure, and natural environment. From evaluation, planning, and permitting through construction, we help move projects forward through the complexities of regulatory compliance, budgetary and schedule constraints, and varying stakeholder interests. Our trained professionals find practical, cost-effective approaches to help you achieve your specific goals. We work to build your trust and confidence in our team, which allows us to offer efficient and effective solutions for the long-term success of your projects.

As a mid-sized firm with more than 700 employees, we combine the personal service of our project managers who stay with your project from start to finish, with a breadth and depth of capabilities to meet project requirements. Our project managers are empowered to be problem-solvers with the ability to make decisions in a timely fashion to keep the project moving forward. We are proud of our low employee turnover; our staff’s long tenure means that the project manager you see at the bidding stage will likely be with you at project completion.

Dudek has a reputation for consistently delivering high-quality projects on time and within budget. With more than 180 on-call contracts throughout the state that provide as-needed environmental engineering, planning, and permitting services, we understand the importance of organization and clear communication. From large water agencies to regional municipalities, we will draw upon decades of experience in managing multiple task orders to ensure all City requests are handled efficiently and cost

POINT OF CONTACT
Susan Smith, PG
Contract Manager
[email protected]
951.300.1085
Office: San Juan Capistrano
27372 Calle Arroyo
San Juan Capistrano,
California 92675
City Council 16 – 85 10/18/2022
Various Environmental Services ii
effectively. We rise to the challenges of meeting tight timelines, and in doing so, have developed an expertise in critical path management, fast-track scheduling, efficient staffing, and workload management.

Dudek’s Capabilities. The Dudek team has diverse expertise and experience to conduct the requested services for the City. We have conducted hundreds of ESAs, performed numerous site investigations, and have worked closely for many years with our subconsultant, Aurora Industrial Hygiene (Aurora), on projects involving Hazardous Material Surveys. We evaluate and manage hazardous materials and wastes from a variety of sites, including facilities contaminated with metals, chlorinated solvents, perchlorate, fuel hydrocarbons, perand poly-fluoroalkyl substances, and pesticides.

Our scientists and planners evaluate potential risks for current and future land uses. We conduct various studies, including those used to obtain risk-based closure for hazardous waste sites, or to support change-of-use applications, including industrial, commercial, and residential projects. Dudek is characterized by the following strengths, which we will bring to this project:
▪ We are proactive. We stay ahead of the curve to avoid surprises from regulatory agencies and stakeholders, or from various issues that may arise during the environmental process. ▪ We provide strategic counsel. We draw upon our wealth of experience to advise on environmental issues that may impact cost, schedule, stakeholders and the public, or legal defensibility.
▪ We work for you. We make sure our clients are always the first to know information so we can discuss roll-out strategies in advance while respecting required legal notifications. We are strong client advocates who have maintained excellent relationships and reputations with regulatory agencies.

Diverse Team of Technical Experts with Experience in Each Aspect of the Scope of Work. The Dudek team includes a deep bench of credentialed environmental engineers, geologists, and hydrogeologists , who have local knowledge and experience.The Aurora team includes experienced and skilled technical staff, including Certified Asbestos and Lead Consultants, California Department of Public Health inspector/risk assessors, Certified Safety Professionals, Certified Microbial Consultants, and professional engineers. Dudek is also proposing the use of trusted subcontractors, such as a geophysical surveyor, drillers, and analytical laboratories to fulfill the scope of work.

Our proposal highlights the qualifications and experience of the Dudek team to successfully assist the City and provides client references who can attest to the quality of Dudek’s work. We are excited by the opportunity to work with the City of Santa Ana. Our team is ready to serve.

Sincerely,
__________________________________ _____________________________________ Joe Monaco Susan Smith
President Contract Manager
Joseph Monaco is authorized to sign on behalf of Dudek.

City Council 16 – 86 10/18/2022
Various Environmental Services iii
Table of Contents

SECTIONS
Cover Letter......................................................................................................................................................... i Contract Agreement Statement.........................................................................................................................iv Firm and Team Experience ............................................................................................................................... 1 Understanding of Need...................................................................................................................................... 6 Relevant Project Experience and References .................................................................................................. 7 Scope of Services and Schedule..................................................................................................................... 12 TABLES
1 Key Staff Percentage of Time Devoted to Project ................................................................................ 5 2 Project Specific Experience................................................................................................................. 11 3 Project Timeline................................................................................................................................... 16 FIGURE
1 Dudek Team Organization .................................................................................................................... 2

APPENDICES
A Resumes
B Certifications
City Council 16 – 87 10/18/2022
Various Environmental Services iv
Contract Agreement Statement

1. Regarding Section 3 of the agreement, Dudek respectfully requests the ability to request annual rate increases in line with applicable CPI.

2. Dudek respectfully requests the following be added to the end of Section 7 of the agreement:
“Notwithstanding the foregoing, with respect to any professional liability claim or lawsuit, this indemnity does not include providing the primary defense of the City, provided, however, the Consultant shall be responsible for the City’s defense costs to the extent such costs are incurred as a result of the Consultant’s negligence, recklessness, or willful misconduct.” City Council 16 – 88 10/18/2022
Various Environmental Services 1
Firm and Team Experience
The Dudek Advantage
At Dudek, we understand that successful reuse/redevelopment of contaminated property requires a team of engineering, geology, and hydrogeology professionals who understand
local, state, and federal regulations and are skilled in navigating the nuances of regulatory agencies. We have
extensive experience conducting environmental site
assessments (ESAs) and investigations, as well as evaluating and implementing remedial alternatives that are appropriate, applicable, and cost-effective.

DIVERSE CAPABILITIES AND QUALIFIED STAFF
Environmental Site Assessments
Dudek geologists, environmental engineers, and scientists have conducted hundreds of Phase I ESAs in accordance with the appropriate ASTM Standard and other applicable
regulatory, lender, and client-specific requirements. We are thorough in our research to determine recognized
environmental conditions (RECs) and/or environmental
concerns that can impact the cost, risk, and schedule of a project. Dudek engineers and geologists expertly design and implement Phase II ESAs to collect a comprehensive data set for use in planning, site development/redevelopment, land use risk assessments, and/or remediation, as well as to satisfy regulatory requirements. We understand that most projects are subject to schedule and/or budgetary constraints, and we take those into consideration when specifying data objectives. We prepare site-specific risk assessments to evaluate potential risks for current and future land use. These studies may be used to obtain risk-based closure for contaminated sites or to support change-of-use applications, such as from industrial to commercial or residential Hazardous Materials Surveys
Aurora Industrial Hygiene (Aurora) will perform services related to hazardous materials building surveys. Aurora is a small, woman-owned business enterprise that provides the highest quality industrial hygiene and safety services. Their small size ensures that a Certified Industrial Hygienist will manage all projects, and all field work will be conducted by experienced field-level industrial hygienists who are certified by the State of California as Asbestos Consultants or Site Surveillance Technicians and Lead Inspector/Risk Assessors and Project Monitors. Aurora’s staff is specialized in the fields of industrial hygiene, environmental testing, safety, asbestos, lead-based paint, mold inspection and management, indoor air quality, construction safety, OSHA compliance auditing, and training.

SERVICES OVERVIEW
Dudek
▪ Phase I and Phase II ESAs
▪ Air, soil, soil vapor, and
groundwater sampling
▪ Remediation feasibility/
cost analysis
▪ Soil, soil vapor, and
groundwater remediation
▪ Hazardous materials and
waste classification
and disposal
▪ Hazardous Waste
Facility permitting
▪ Hazardous Materials
Business Plans
▪ Regulatory agency
coordination
▪ Spill, Prevention, Control,
and Countermeasures Plans
Aurora Industrial Hygiene
▪ Industrial hygiene
▪ Lead and asbestos
management
▪ Safety and risk
management
▪ Indoor air quality
City Council 16 – 89 10/18/2022
Various Environmental Services 2
Project Team
The Dudek and Aurora team will provide the City of Santa Ana (City) with the appropriate skills and experience necessary for the services outlined in the Request for Proposal (RFP). We will be supported by subconsultants and subcontractors who are well-regarded and accomplished in their respective disciplines and bring local, relevant experience. Dudek will serve as prime consultant and be contractually responsible for overall management, quality, and delivery of final products.

Figure 1 illustrates the project organization and responsibilities of the Dudek team. Brief biographies for key personnel follow. Focused resumes are provided in Appendix A.

Figure 1. Dudek Team Organization

CONTRACT

MANAGEMENT
Contract Manager
Susan Smith, PG
Principal In Charge
Glenna McMahon, PE

CATEGORY I
KEY LEADERS:

CATEGORY I CATEGORY II
Phase I ESA
Audrey Herschberger,
PE
Phase II ESA
Nicole Peacock, PE,

PG, CHG
Hazardous Materials
Surveys
Grace Rinck, CIH
1 SUBCONTRACTORS
Hazardous Waste
Management/Disposal
Belshire
Utility Clearance/
Geophysical Surveys
ULS Services Inc.

Land Surveyor
Calvada
Drilling
BC2 Environmental
Millennium
Environmental
Laboratories
Eurofins Calscience
Jones Environmental
Eurofins EMLab P&K2
LA Testing2
1 Aurora Industrial Hygiene
2 Category II Laboratory
City Council 16 – 90 10/18/2022
Various Environmental Services 3

DUDEK KEY PERSONNEL

SUSAN SMITH, PG
Contract Manager
Susan Smith has 20 years’ experience in environmental
consulting and project management. Her experience is diverse in nature and covers much of the environmental project spectrum, from Phase I ESAs to litigation support for Potentially Responsible Party designation rebuttal. Her project experience includes oil field remediation, gas station investigation and remediation, soil sampling, soil vapor sampling, groundwater sampling, asbestos surveys, lead-based paint surveys and abatement, litigation support investigations, quality assurance and quality control reviews, as well as a large-scale plume characterization study for a former refinery.

Representative Project Experience
▪ Project Manager: Commercial Property Phase II ESA, Banning, California ▪ Project Manager: Veteran’s Resource Center Phase II ESA, Norco, California ▪ Project Geologist: Phase I and Limited Phase II ESA, Santa Monica, California

GLENNA MCMAHON, PE
Principal in Charge
Glenna McMahon has 22 years’ environmental consulting and project management experience. She focuses on environmental engineering and hydrogeology, specifically hazardous waste investigation, monitoring and remediation, as well as litigation support. Her project experience includes ESAs; soil, soil vapor, and groundwater sampling and data evaluation; health risk assessments; evaluation, design, and implementation of remedial alternatives; environmental compliance; and third-party evaluation of remediation expenditures. Ms. McMahon manages several projects that involve state or local regulatory oversight Representative Project Experience
▪ Project Manager: Former Manufacturing Facility, Groundwater Monitoring and Remediation, Stockton, California
▪ Project Manager: Sewer Force Main Replacement, Site Assessment, Investigation and Hazardous Materials Contingency Plan, City of Chula Vista, California ▪ Project Manager: San Diego State University West, Hazardous Materials Evaluation and Survey, San Diego, California
Education
California State University,
Fullerton
BS, Geological Sciences
Certifications
PG, CA No. 9176
OSHA 40–Hour HAZWOPER
OSHA Site Supervisor Health &
Safety Training
RCRA and DOT Hazardous
Waste Handler Training
First Aid + CPR

Education
University of Vermont
BS, Civil and Environmental
Engineering
Certifications
PE, CA No. 79742
CEM, NV No. 1974
OSHA 40-Hour HAZWOPER
OSHA Site Supervisor
RCRA and DOT Hazardous
Waste Manager Certification
City Council 16 – 91 10/18/2022
Various Environmental Services 4

AUDREY HERSCHBERGER, PE
Phase I ESA Lead
Audrey Herschberger is a professional environmental engineer with 14 years’ experience in environmental consulting,
specializing in regulatory compliance, including stormwater permitting in Oregon, Washington, and California, and federal Spill Prevention, Control, and Countermeasure Plans. Ms.

Herschberger’s experience includes Phase I ESAs under ASTM E1527-13 and -21; Phase II ESAs under ASTM E1903-19;
hazards and hazardous material analysis under the California Environmental Quality Act (CEQA); management of small to mid-size environmental sampling, stormwater treatment, and permit compliance projects; and hazardous material
management and abatement projects.

Representative Project Experience
▪ Project Engineer: California Department of
Transportation Initial Site Assessments, City of La
Cañada Flintridge, California
▪ Project Engineer: Phase I ESA Peer Review, Phase I
ESA and Phase II ESA, City of Oxnard, California
▪ Project Engineer: Hazards and Hazardous Materials Assessment, Orange County Sanitation District, Orange County, California

NICOLE PEACKOCK, PE, PG, CHG
Phase II ESA Lead
Nicole Peacock is an environmental engineer and geologist with 23 years’ experience. Ms. Peacock performs numerous tasks dealing with hazardous waste investigation and
remediation projects, including soil, soil vapor, and groundwater investigation and remediation and litigation support and cost allocation among potentially responsible parties for hazardous waste sites. She also provides services for Phase I and II ESAs, school site assessments, landfill monitoring,
environmental compliance, and community relations.

Representative Project Experience
▪ Project Manager: City of Monterey On-Call, Monterey, California ▪ Project Manager: City of Orange Phase II ESA, Orange, California ▪ Project Manager: City of Hermosa Beach Corrective Action Plan, Hermosa Beach, California Education
Oregon State University
BS, Chemical Engineering
Certifications
PE, OR No. 80505PE
40-Hour HAZWOPER
Certification
8-Hour HAZWOPER Refresher
10-Hour OSHA Construction
Standards
First Aid/CPR Certification
Hazardous Waste Basics,
Managing Common Wastes
Oregon Department of
Environmental Quality
Professional Affiliations
AWMA Pacific Northwest
International Section

Education
University of California,
Los Angeles
BS, Civil and Environmental
Engineering/Geology
Certifications
PE, CA No. 68775
PG, CA No. 8553
CHG, CA No. 940

City Council 16 – 92 10/18/2022
Various Environmental Services 5
Staff Availability
Table 1. Key Staff Percentage of Time Devoted to Project Name Role
30% to 40% of
Hours
40% to 80% of
Hours
Susan Smith Contract Manager
Glenna McMahon Principal in Charge
Audrey Herschberger Phase I ESA Lead
Nicole Peacock Phase II ESA Lead
Grace Rink1 Hazardous Materials Surveys
Lead
1 Aurora Industrial Hygiene
City Council 16 – 93 10/18/2022
Various Environmental Services 6
Understanding of Need
Category I: Environmental Site Assessments and Investigation Successful reuse/redevelopment of contaminated property requires a team of engineering, geology, hydrogeology, and chemistry professionals; an understanding of local, state, and federal regulations; and familiarity with the nuances of regulatory agencies. Our experts evaluate and manage all aspects of environmental due diligence, cost–benefit analysis, data collection, risk assessment, remediation, and environmental program management. We evaluate and implement remedial alternatives that are costeffective, time-sensitive, and consider all aspects of risk. We have successfully performed investigation and remediation on commercial and industrial properties, including manufacturing facilities, dry cleaners, automotive shops, oil fields, schools, universities, agricultural sites, hotels, casinos, and renewable energy facilities, as well as residential project sites.

Our professionals have conducted hundreds of Phase I ESAs in accordance with the appropriate and applicable ASTM standard. We are thorough in our research to determine recognized environmental conditions (RECs) and/or environmental concerns that can impact the cost, risk, and schedule of a project.

We are often asked to evaluate items beyond the ASTM scope for Phase I ESAs, including existing conditions related to hazardous building materials and mold as well as providing information regarding radon, oil and gas wells, and methane zones.

Dudek environmental engineers and geologists expertly design and implement Phase II ESAs to collect a comprehensive data set for use in planning, site development, and/or remediation, as well as to satisfy regulatory requirements. We understand that most projects are subject to schedule and/or budgetary constraints, and we take those into consideration when specifying data objectives. Dudek scientists prepare site-specific risk assessments to evaluate potential risks for current and future land use. These studies may be used to obtain risk-based closure for open hazardous waste sites or to support change-of-use applications, such as from industrial to commercial or residential.

While not a part of the requested services for this RFP, Dudek also prepares and performs groundwater modeling, remedial investigation/feasibility studies, remediation, soil management plans, hazardous materials contingency plans, as well as hazardous waste facility permits. This additional experience gives us the foundation to better understand and evaluate data and anticipate future project needs.

Dudek understands the importance of quality assurance/quality control (QA/QC). Our QA/QC program consists of senior staff oversight and administrative management. All project deliverables will be independently checked and cross-checked to ensure that the data are accurately represented in each report. We will ensure that all project-related correspondence and project files are maintained and named in accordance with City requirements.

Category II: Hazardous Materials Surveys
Aurora provides comprehensive asbestos and lead management services that take projects from initial inspection through abatement and clearance testing. Aurora’s team consists of Certified Industrial Hygienists, Department of Public Health-Certified Lead Inspectors, Asbestos Consultants, risk assessors, project monitors and designers, and Asbestos Hazard Emergency Response Act asbestos specialists who provide asbestos and lead risk management services as well as other hazardous materials building surveys.

City Council 16 – 94 10/18/2022
Various Environmental Services 7
Relevant Project Experience and References
Category I Project Experience

CITY OF ANAHEIM OIL SPILL ASSESSMENT
Client: City of Anaheim
Project Location: Anaheim, California
Project Dates: 2021
Client Reference: Jonathan Sanks, [email protected], 714.765.4117 Key Personnel: Susan Smith
Dudek performed an oil spill assessment at a commercial property in Anaheim. A pad-mounted transformer was vandalized, which resulted in the release of transformer oil to asphalt and earthen surfaces. The release was not considered to be an Environmental Protection Agency-regulated Polychlorinated biphenyl (PCB) spill cleanup given that the concentration of PCBs in the transformer oil was below Toxic Substances Control Act criteria. The investigation consisted of sampling asphalt and soil samples within the spill area to determine the extent of the spill and identify additional areas of impact.

Concentrations of PCBs detected were well below regulatory screening levels; no additional investigation was recommended.

CITY OF MONTEREY ON-CALL CONTRACTS
Client: City of Monterey
Project Location: Monterey, California
Project Dates: 2016–2022
Client Reference: Antonio Hernandez, [email protected], 831.646.3923 Key Personnel: Nicole Peacock, Susan Smith
Dudek has two on-call contracts with the City of Monterey; one for planning (since 2016) and one for hazardous materials (since 2019). Our environmental and planning services contract has completed 25 work orders for the Planning and Engineering offices. Our hazardous materials contract has included hazardous materials consulting for a utilities project and waste management consulting for several projects. For the utilities project, Dudek assisted the City with preparation of a Soil and Groundwater Management Plan (Plan). The City submitted the Plan to potential construction bidders on the Franklin Street Utilities Project to ensure that the construction work and environmental work were aligned.

Dudek reviewed the construction plans to identify potential environmental concerns based on the depth and location of the proposed trenching. Dudek collected soil samples from potholes along the proposed trench alignment, coordinated with disposal facilities, and provided the City with a map identifying the planned disposal facility by station. Dudek also collected groundwater samples to assist with waste management during dewatering.

City Council 16 – 95 10/18/2022
Various Environmental Services 8

CITY YARDS MASTER PLAN PHASE I AND PHASE II ESA AND EIR Client: City of Santa Monica
Project Location: Santa Monica, California
Project Dates: 2017–2019
Client Reference: Rachel Kwok, [email protected], 310.458.8341 Key Personnel: Glenna McMahon, Susan Smith
Dudek prepared a Phase I ESA for the 15.5-acre Santa Monica City Yard property as part of the due diligence process for the Environmental Impact Report (EIR). The project involved proposed reconstruction of the Santa Monica City Yards, which included demolition of existing buildings, excavation activities, and construction of new buildings. The Phase I ESA identified RECs associated with groundwater impacts from an adjacent gas station and potential presence of tetrachloroethylene in deep groundwater from a regional plume. The Phase I ESA also identified a controlled REC (i.e., the presence of a former landfill on the subject property) and a historical REC (i.e., former underground storage tank [UST] releases). The report was prepared in accordance with ASTM Standard and the All Appropriate Inquiries Rule. Dudek conducted a Phase II ESA for the project to evaluate the RECs identified in a Phase I ESA. The Phase II ESA investigation was focused on the former aircraft/missile manufacturing and leaking UST areas; additional sample points were advanced near the perimeter of the property to evaluate potential impacts from the regional groundwater plume. The Phase II ESA investigation consisted of a geophysical survey, and soil and soil vapor sample collection and analysis.

Soil samples were analyzed for metals and soil vapor samples were analyzed for gasoline range organics and volatile organic compounds (VOCs).

CHULA VISTA ESAs AND HAZARDOUS MATERIALS CONTINGENCY PLAN Client: City of Chula Vista
Project Location: Chula Vista, California
Project Dates: 2017–2020
Client Reference: Alan Reyes, [email protected] 619.407.3588 Key Personnel: Glenna McMahon, Audrey Herschberger
Dudek evaluated a Public Works project for Conditional Exemption for the CEQA process. Dudek conducted an ESA and subsequent Phase II ESA (groundwater and soil investigation) to determine the extent of impacts to the project area from adjacent contaminated sites. Following the evaluation of the data collected during the Phase II ESA, Dudek prepared a Hazardous Materials Contingency Plan (HMCP) detailing known impacts and outlining plans for management of contaminated materials during construction process. Dudek also assisted the City with determining a process for obtaining a dewatering permit. Dudek recently conducted a new Phase I ESA and revised the HMCP for the expanded project area. Dudek is scheduled to conduct monitoring for the City during the construction process.

City Council 16 – 96 10/18/2022
Various Environmental Services 9
Category I and II Joint Relevant Project Experience

SAN DIEGO STATE UNIVERSITY/QUALCOMM STADIUM
Client: San Diego State University
Project Location: City of San Diego
Project Dates: 2018–2020
Client Reference: Michael P. Masterson, Gatzke Dillon Balance, [email protected] 760.431.9501
Key Personnel: Glenna McMahon, Audrey Herschberger
Dudek completed work for the San Diego State University (SDSU) Mission Valley Campus Master Plan, which included preparation of the CEQA hazards and hazardous materials evaluation and demolition of Qualcomm Stadium for future construction of a new stadium, student housing, campus/office buildings, a park, and trolley transit center. The hazards and hazardous materials impact analysis was multifaceted and included the following:
▪ Evaluation of regulatory records for on-site and surrounding hazardous material releases ▪ Review of the use of explosives for demolition of the existing stadium ▪ Review and analysis of a release and cleanup action occurring on the project site due to the adjoining Kinder Morgan Mission Valley Terminal (MVT)
▪ Analysis of potential impacts associated with MVT petroleum pipelines transecting the project site. Mitigation required safety measures and cooperation with Kinder Morgan ▪ Review and analysis of the active Cleanup and Abatement Order issued to MVT which required monitoring wells to remain on the project site in active working order. Mitigation required a well decommissioning/protection plan
▪ Analysis of potential vapor intrusion due to on-site contamination and mitigation for future residential site use
▪ Coordination and management of a hazardous materials survey, which was conducted by Dudek’s subcontractor Aurora.
▪ The survey was conducted based on Dudek’s findings in the EIR and recommended mitigation.

Dudek served as project manager and provided a direct line of communication between Aurora and SDSU and its contractor, reviewed the hazardous material surveys and work products, coordinated on-site activities, and ensured the work completed would meet the requirements set forth in the EIR mitigation. Aurora also prepared specifications for abatement of the hazardous materials City Council 16 – 97 10/18/2022
Various Environmental Services 10
Category II Relevant Project Experience

HOUSING AUTHORITY CITY OF LOS ANGELES PUBLIC HOUSING PROJECTS Client: Housing Authority City of Los Angeles
Project Location: Public Housing Residential Properties Project Dates: 2002–Ongoing
Client Reference: Eric Tellez, [email protected], 213.252.4290 Key Personnel: Grace Rinck, Matthew Froehlich, Robert Rinck Since 2002, Aurora has been under contract with the Housing Authority City of Los Angeles. In the time, they have written specifications and work plans; conducted industrial hygiene investigations from noise, metals, and silica monitoring to indoor air quality and asbestos and lead; and provided training to over 600 employees at the different residential campuses. They have conducted full residential interior and exterior inspections with subsequent air monitoring and clearance sampling. In 2017, Aurora personnel conducted an exterior inspection of 62 multi-residential buildings located at the Pueblo Del Rio campus.

Aurora personnel then wrote the specification and produced the work plan for the one-year asbestos and lead window remediation project. The project (September 2016–November 2017) required asbestos and lead air monitoring, visual and surface clearances, and delivery of samples to the laboratory. Lead surface results were rushed and reported to the client on a daily basis so that residents could return to their units within one workday. In 2021–2022, Aurora conducted asbestos/lead testing at 1066 Units at the Nickerson Gardens campus.

ENVIRONMENTAL TESTING; LOS ANGELES DEPARTMENT OF PUBLIC WORKS Client: Los Angeles County Department of Public Works/Internal Services Department Project Location: 900 South Fremont Avenue, Alhambra, California Project Dates: 2002–Ongoing
Client Reference: Luana Enriquez, [email protected], 626.458.5943 Key Personnel: Grace Rinck, Gloria Chan, Matthew Froehlich, Robert Rinck Since 2002, Aurora has provided as-needed environmental testing and consulting services, documentation and training, and abatement oversight. The contract is through Los Angeles County Internal Services Department but can be and is utilized by other departments, including the Department of Public Works and the Department of Health Services.

In December 2021, Aurora conducted an asbestos inspection, wrote the South Coast Air Quality Management District Procedure 5 asbestos removal plan, and provided inspection/monitoring and clearance services for a project at the County’s headquarter building. All work was completed during holiday weekends in November and December.

City Council 16 – 98 10/18/2022
Various Environmental Services 11

PROJECT-SPECIFIC EXPERIENCE
Table 2: Project Specific Experience. Below are some municipal clients that Dudek has worked with and some of the services the Dudek Team has provided.

Client
Environmental Site AssessmentsSoil, Soil Gas, and/or Groundwater InvestigationsLeaking Underground Fuel Tank Investigations and RemediationSite Management Plan, Remedial Action Plans, and Construction Remediation MonitoringPerform Remedial ActivitiesMiscellaneous Environmental Compliance Support City of Anaheim X X X
City of Calexico X X
City of Carmel X
City of Carson X X X
City of Chula Vista X X X X
City of Compton X X X X
City of Encinitas X X
City of Fontana X X X
City of Gonzales X
City of Hermosa Beach X X
City of Lake Forest X
City of Monterey X X X
City of Napa X
City of Ontario X X
City of Orange X X X
City of Palm Springs
City of Pomona X X X X
City of Redondo Beach X
City of San Diego X X X X
City of San Marcos X
City of Santa Barbara X X
City of Santa Cruz X X
City of Santa Monica X X X
City of Seal Beach X X
City of Vallejo X
City of Vista X X X X X
City Council 16 – 99 10/18/2022
Various Environmental Services 12
Scope of Services and Schedule
Category I
Phase I ESAs
Phase I ESAs identify concerns on a property related to hazardous or potentially hazardous substances. Our Phase I ESAs are prepared in accordance with the ASTM Standard Practice for ESAs:

Phase I Site Assessment Process E 1527-13 and E 1527-211. The Phase I ESA will include review and evaluation of past and current uses of the site for indications of the manufacture, generation, use, storage, and/or disposal of hazardous substances, and evaluation of potential soil and/or groundwater contamination resulting from current and historical land use activities, including those of nearby properties. Specifically, Dudek will perform the following:
▪ Conduct a search of regulatory agency records to see if there are currently, or were previously, any reports of hazardous materials contamination or usage at the sites or contamination at other nearby sites within the ASTM-specified search radius that could impact the site ▪ Review records maintained by local regulatory agencies, including the fire department, health department (Certified Unified Program Agency), building department, Regional Water Quality Control Board, and Department of Toxic Substances Control (DTSC) ▪ Review historical source information, including historical aerial photographs, historical topographic maps, Sanborn fire insurance maps, and City Directories ▪ Review previous environmental investigations, soil sampling reports, or remediation plans as provided by the City
▪ Conduct a site reconnaissance and document current conditions ▪ Evaluate the potential for vapor intrusion risk
▪ Conduct a search of environmental liens and activity use limitations for the project assessor’s parcel number (if applicable)
▪ Interview the owner(s) and/or site representative(s) regarding the environmental history and background of the site
The findings of the investigation will be summarized in a Phase I ESA report. As per the ASTM Standard, the report will list RECs identified for the site, as well as historical RECs, controlled RECs, and significant data gaps. If the findings of the Phase I ESA indicate a potential impact of hazardous wastes or materials on the site, Dudek will include recommendations for further assessment and/or investigation (e.g., Phase II ESA).
1 ASTM E 1527-21 was released on November 17, 2021. Environmental Protection Agency (EPA) concurrence with the new standard will reportedly take up to one year. Thus, compliance with the All Appropriate Inquiries rule to qualify for an exemption from Comprehensive Environmental Response, Compensation, and Liability Act liability will remain under E 1527-13 until EPA concurs with the new standard.

City Council 16 – 100 10/18/2022
Various Environmental Services 13
If requested by the City, the following non-ASTM items can be evaluated as part of the Phase I ESA:
▪ Asbestos-Containing Materials. Dudek can conduct a cursory visual assessment of accessible areas and/or review existing survey reports to determine if asbestos containing materials are present.
▪ Lead-Based Paint. Dudek can conduct a cursory visual assessment of accessible areas and/or review existing survey reports to determine if lead-based paint is present. ▪ Mold. Dudek can conduct a cursory visual assessment of accessible areas to determine if mold is present.
▪ Radon. Dudek will evaluate existing local/regional data from the Environmental Protection Agency (EPA).
▪ Methane Zone. Dudek will determined if the site is within a methane zone based on publicly available data.

Phase II ESAs
While the scope of work for a Phase II ESA can vary from site to site, the main components are described as follows. All work plans, work, and reports will be prepared/performed in general accordance with ASTM Standard Practice for Environmental Site Assessments: Phase II Environmental Site Assessment Process E1903-19 under the direct supervision of a professional engineer or professional geologist.

Work Plans
Site-specific work plans or field sampling plans will be prepared for each investigation. Each work plan will include a statement of objectives, site history, scope of work, proposed sampling locations, target analytes, and a schedule. The draft work plan will be submitted to the City for review. Work will not commence until the work plan is approved by the City.

Health and Safety Plan
Dudek will prepare a site-specific Health and Safety Plan describing safety aspects of the work to be performed at the site. The Health and Safety Plan will be prepared in compliance with the California Code of Regulation (CCR) Title 8 Section 5192 (Hazardous Waste Operations and Emergency Response), CCR Title 8 Section 3202 (Injury and Illness Prevention Plan, and OSHA regulation 29 Code of Federal Regulations 1910.120.

Surface Geophysical Investigations
Dudek will partner with ULS CA, Inc (ULS) for geophysical investigations and utility surveys. ULS will utilize various non-invasive tools and techniques (ground penetrating radar, electromagnetic, metal detectors, seismic refraction, and magnetometers) to identify potential subsurface utility conflicts, buried tanks, drums, sumps, and other anomalies that may help guide a Phase II investigation. The results of geophysical investigations will be presented in a standalone report or incorporated into a Phase II ESA report.

City Council 16 – 101 10/18/2022
Various Environmental Services 14
Soil Gas Survey
Soil gas surveys are a useful tool to identify and evaluate potential impacts at a site. A direct push drill rig is typically used to advance boreholes to the targeted subsurface depth. Dudek will partner with Millennium Environmental, Inc. for direct push and sub-slab drilling services. Following borehole advancement, temporary soil vapor probes will be constructed in accordance with the DTSC Advisory– Active Soil Gas Investigations. Probe inlets will be placed in sand, topped with dry granular bentonite, then sealed with hydrated bentonite chips. Each probe will be allowed to equilibrate for a minimum of two hours prior to sampling. A tracer gas compound will be used to test for leaks around the temporary soil vapor probe penetration seal at the ground surface and within the sampling system. A default of three purge volumes will be extracted prior to sampling from the probe locations. The soil vapor samples will be collected in accordance with the DTSC Advisory.

Dudek will partner with Jones Environmental Laboratories, Inc. (Jones), to provide mobile and stationary analytical services for soil gas samples. Dudek will ensure that the laboratory reporting limits will meet the project objectives. At the end of the sampling event, all soil boring locations will be resurfaced matched to the existing ground surface. Drilling equipment will be appropriately decontaminated before the commencement of any drilling activities and in-between boreholes. The findings of the soil gas survey will be presented in a standalone report or incorporated into a Phase II report.

Drilling
Dudek will provide support for the permitting, drilling, installation, development, and sampling of deep borings and groundwater monitoring wells. Dudek will partner with BC2 Environmental for hollow-stem auger, mud rotary, air rotary, and sonic drilling services. The drilling methods previously described provide capabilities to drill through various media, including consolidated and unconsolidated sediments, rocks, asphalt, concrete cement, and waste materials. Each boring will be logged using ASTM Standard D2488-09a–Standard Practice for Description and Identification of Soils (Visual– Manual Procedure). Boring logs will also include descriptions of the lithologies and grain sizes, color, moisture content, cohesive characteristics, odors, and any other pertinent information (e.g., blow counts, photoionization detector readings, anthropogenic materials, etc.). The subsurface lithologies will be used to determine the well screen slot size and filter pack materials best suited for the site. Wells will be constructed in accordance with the Department of Water Resources (DWR) California Well Standards Bulletins.

Groundwater monitoring wells will be developed at least 24 hours following the completion of construction. The drilling activities, including permits and DWR documentation, will be presented in a standalone report or incorporated into a Phase II ESA report.

Sampling
The media to be sampled at a site (air, soil, soil vapor, and/or groundwater) is dependent on the type of contamination present or suspected. The work plan/field sampling plan will outline the suspected concerns and include proposed sample locations, media, sample depth(s), and targeted analytes. All sampling will be performed in accordance with applicable regulatory protocols and/or standard industry practices. For example, soil samples to be analyzed for volatile components (e.g., gasoline-range hydrocarbons and VOCs) will be collected in accordance with EPA Method 5035. Dudek will ensure that the samples for all media (soil, soil vapor, or groundwater) are placed in proper containers and that the laboratory reporting City Council 16 – 102 10/18/2022
Various Environmental Services 15
limits will meet the project objectives. The findings of the sampling will be presented in a standalone report or incorporated into a Phase II report.

Laboratory Analysis
Dudek will partner with Jones and Eurofins Calscience to provide laboratory analytical services. Both labs are certified by the California Environmental Laboratory Accreditation Program. Eurofins Calscience is also certified by the National Environmental Laboratory Accreditation Program and American Industrial Hygiene Association Laboratory Accreditation Program. All laboratory analyses will be performed in accordance with applicable EPA Methods and Contract Laboratory Program protocols. Any deviations from the EPA Methods will be documented. All samples will be collected in laboratory-supplied containers with proper preservative, properly labeled (unique sample number, date, time, site name, sampler name, and requested analysis), logged on a chain-of-custody, placed in an ice-chilled cooler, and transferred to the laboratory by field personnel or via laboratory courier. Aurora will partner with LA Testing/EMSL and Eurofins EMLab P&K for asbestos, lead, and mold laboratory analytical services.

Reports
Reports will include a statement of the objective, site background information, description and rationale for the investigation, deviations, methods used, data evaluation and comparison to regulatory screening levels, data interpretation, figures, tables, laboratory analytical reports, and any additional supporting information. Reports will be prepared under the direct supervision of a professional engineer or professional geologist.

Agency Coordination
Dudek will coordinate with local and state officials, as necessary, to facilitate project objectives.

Coordination with agencies may include obtaining permits for subsurface investigation work, coordinating field work schedules on public properties, and entering into a voluntary oversight agreement to ultimately obtain certified regulatory closure. Dudek will not contact any property owners, regulatory agencies, or other entities without expressed permission from the City.

Category II
Hazardous Building Materials Surveys
Aurora will survey and test buildings, storage vessels (tanks, containers, drums, etc.), and stored materials for the presence of hazardous waste or materials. The survey and testing may include visual inspection for the presence of suspected lead-based paint (LBP) and asbestos-containing materials (ACM), identification of potential PCB-containing equipment and materials, identification of universal waste, contents of materials stored in vessels, and assessment of buildings where hazardous materials or wastes are stored.

Surveys typically consist of the collection and submittal of samples from homogeneous areas for asbestos analysis by polarized light microscopy. The LBP assessment of suspect materials will be performed using X-ray fluorescence technology; paint chips of damaged areas may be collected for laboratory confirmation. Depending on the constituents of concern, additional sampling may be performed to categorize other waste materials at a site (universal waste, PCBs, etc.) City Council 16 – 103 10/18/2022
Various Environmental Services 16
California law requires submittal of a California Department of Public Health Form 8552 to the state following lead inspection activities in public or commercial buildings. As such, Aurora will submit the Form 8552 to the state, with a copy submitted to the City. The findings of the survey, whether it be visual or include laboratory analysis, will be presented in a standalone report or incorporated into a Phase I or II ESA report.

Aurora has also supported Dudek projects with the preparation of abatement specifications for construction bids and monitoring during demolition/renovation Table 3. Project Timeline
Project Milestone
Estimated Completion Time
from Task Order Award
Category I
Phase I ESA Database Search, Site Reconnaissance,
Agency Interviews, Historic Records
Review
2 weeks
Report Preparation and Submittal 2 weeks
Phase II ESA Work Plan Preparation, Commission
Review, Health and Safety Plan
Preparation
2 weeks
Field Activities and Data Evaluation 2–4 weeks
Commission Review 1 week
Report Submittal 1 week
Category II
Hazardous Materials
Surveys
Building Survey and Sampling 1 week
Report Preparation and Submittal 3 weeks
City Council 16 – 104 10/18/2022
3 Site Investigation and Remediation/Removal Action
Groundwater Monitoring and Reporting, Former Battery Recycling Facility, Los Angeles, California.

Performed quarterly groundwater monitoring and reporting under Department of Toxic Substances Control (DTSC) oversight at the former battery recycling facility. Additional tasks included oversight of well redevelopment and evaluation of pressure transducer data and groundwater elevation trends.

Newport Beach Aerospace Facility Studies, Raytheon Systems Co., Newport Beach, California.

Performed two pilot studies at a Newport Beach facility contaminated with chlorinated solvents. Implemented in situ chemical oxidation using potassium permanganate, and enhanced in situ bioremediation by injecting ethanol as an electron donor for existing bacteria.

Solvent Release Source Evaluation and Investigation, Allen Matkins Leck Gamble Mallory & Natsis LLP, San Diego, California. Conducted a subsurface investigation at a solvent release site in Sorrento Valley. Prepared work plans and sampling reports for submittal to the County of San Diego Department of Environmental Health under the County’s Voluntary Assistance Program. Oversaw the installation and sampling of groundwater monitoring wells and soil vapor probes. Requested case closure based on human health risk assessment and groundwater monitoring data.

Former Aerospace Facility Investigation, San Diego, California. Conducted soil, soil vapor, and indoor air sampling at a former aerospace facility that had been redeveloped for commerical use. Currently overseeing modifications to the indoor air flow as a first attempt to lower indoor air VOC concentrations.

Pump and Treat Facility, Kearney – KPF, Stockton, California. Performed quarterly groundwater monitoring at a chlorinated solvent and 1,4-dioxane-contaminated site in Stockton. Installed groundwater monitoring wells. Prepared groundwater monitoring reports and a Feasibility Study for site remediation.

Rush Truck Centers Site Investigation, TerraGraphics Environmental Engineering, Escondido, California. Conducted a site investigation at a former truck maintenance facility. Removed a clarifier and surrounding petroleum-impacted soil for off-site disposal. Closed an outdoor sump. Conducted a soil vapor survey and human health risk evaluation. Obtained case closure from the County.

Pacific Honda Groundwater Monitoring, San Diego, California. Conducted groundwater monitoring and soil vapor sampling at the gasoline-impacted service site. Conducted free product removal. Prepared a Corrective Action Plan and received case closure from the County of San Diego.

Former Petroleum Refinery Environmental Consulting, Confidential Client, Ventura County, California. Managed waste removal during petroleum refinery decommissioning under EPA oversight.

Conducted soil sampling and removal of petroleum hydrocarbon-impacted soil and polychlorinated biphenyl (PCB)-impacted soil. Removed a former oil UST under County oversight.

Soil Sampling and Ecological Risk Assessment for Wetlands Mitigation Site Planning Project, San Diego County Water Authority (SDCWA), California. Conducted soil sampling and an ecological risk evaluation for a former agricultural field for the SDCWA wetland mitigation banking project.

Prepared reports for submittal to the RWQCB and attended meetings with the RWQCB to discuss the results of the investigation.

Marley Monitoring Reports, SPX Cooling Technologies, Stockton, California. Prepared a groundwater monitoring report and a Five Year Review for a metals-impacted site in Stockton.

City Council 16 – 105 10/18/2022
4 Carlsbad Municipal Golf Course Lead Sampling, City of Carlsbad, California. Conducted lead sampling at a former police shooting range using x-ray fluorescence (XRF) and laboratory confirmation. Oversaw remediation of the lead-contaminated soil.

NAS North Island SWMU 87 SI, San Diego, California. Served as project manager for the environmental investigation of a suspected former wash area at NAS North Island believed to be contaminated with pesticides. Coordinated the site investigation, including historical research and soil and groundwater sampling; coordinated and prepared the analytical data set for risk assessment; reviewed the risk assessment results and the comparison of data to water quality objectives with DTSC, RWQCB, and the client; and completed the SI report.

Inglewood Former Oil Field, Irell & Manella, LLP, Inglewood, California. Investigated total petroleum hydrocarbon contamination at a site in Inglewood by conducting soil sampling and research. Based on the site investigations, excavated and treated (off site) approximately 1,000 tons of contaminated soil in order to prepare the site for a transfer of ownership. The excavation was conducted under Air Quality Management District oversight.

NAS North Island Solid Waste Management Unit (SWMU) 132 Site Investigation (SI), San Diego, California. Served as project manager for the environmental investigation of a NAS North Island site contaminated with metals including arsenic and lead. Coordinated the site investigation, conducted soil and groundwater sampling, coordinated and prepared the analytical data set for risk assessment, and completed the SI. Helped plan an interim remedial action involving removing a layer of metals debris and soil.

Coordinated meetings with DTSC and the RWQCB and received regulatory concurrance with no further action following the interim remedial action.

Groundwater Management Plan, Rainbow Municipal Water District, Rainbow and Fallbrook, California. Prepared a Groundwater Management Plan for Rainbow Municipal Water District.

Litigation Support
Groundwater Contamination Litigation Support, Torrance, California. Prepared a Declaration regarding trichloroethylene (TCE) contaminated groundwater originating from an adjacent site in Torrance, California.

Evaluated groundwater flow directions, concentration trends, and historical uses at the site and the adjacent former industrial site.

Litigation Support for Omega PRP Evaluation, Whittier, California. Presented historical site use information, soil, soil vapor, and groundwater data, as well as groundwater flow direction information to the EPA for an Omega Operable Unit 2 PRP. Site contamination included tetrachloroethylene (PCE).

Whittaker Bermite Site, Santa Clarita, California. Participated in settlement mediations allocating remediation costs associated with perchlorate and volatile organic compound (VOC) contamination at the Whittaker Bermite site.

Litigation Support for Water Discharge Investigation, San Diego, California. Provided litigation support, oversaw installation and monitoring of groundwater wells, and oversaw slug tests and pump tests for a site in San Diego with increasing groundwater elevations and seepage.

Superfund Site Litigation Support, Rialto, California. Provided litigation support for a Goodrich Superfund Site PRP. Site contamination included perchlorate.

City Council 16 – 106 10/18/2022
5 Solvent Plume Litigation Support, Placentia, California. Provided litigation support for a multiparty solvent plume in Placentia. Activities included evaluation of existing data, installation of monitoring wells, aquifer tests, and a search for additional PRPs.

Baldwin Park Operable Unit Litigation Support, Azusa, California. Conducted soil vapor and groundwater sampling. Provided litigation support for a PRP in the Baldwin Park Operable Unit of the San Gabriel Valley Superfund Sites. Site contamination included VOCs.

Plating Shop Removal Action and Litigation Support, Fullerton, California. Removed plating shop waste liquids and solids under EPA oversight. Conducted soil and concrete sampling following the waste removal. Prepared a Waste Removal Completion Report for submittal to EPA and local agencies.

Participated in a settlement mediation among PRPs for VOC-contaminated groundwater remediation costs.

Environmental Compliance
Spill Prevention, Control, and Countermeasure (SPCC) Plan, Helix Water District, El Cajon, California. Prepared an SPCC Plan for the Helix Water District Operations Center.

SPCC Plans, First Solar Electric Inc., Imperial County, California. Prepared Hazardous Material Business Plans (HMBPs) and SPCC Plans for 3 solar facilities.

Risk Management Plan (RMP), Rancho Pauma Mutual Water Company, Pauma Valley, California.

Prepared a RMP and a subsequent RMP Update for the Water Company's chlorination facilities.

Oceanside Sprinter and Escondido Rail HMBP, North County Transit District, San Diego County, California. Prepared HMBPs and SPCC Plans for bus and train maintenance facilities.

Audits for Groundwater Monitoring Sites, Stockton, California. Performed an internal audit of groundwater monitoring activities at two sites based on compliance with the RCRA permit, RWQCB Waste Discharge Requirements, and sampling guidance.

Landfill Studies
BKK Class I Landfill Evaluation and Cost Allocation, Waste Management Recycling and Disposal Services, West Covina, California. Evaluated leachate, landfill gas, and groundwater data, as well as disposal records for the BKK Landfill to assist in remedy selection and cost allocation. Participated in cost allocation discussions and prepared a cost allocation model for the PRPs at the BKK Landfill.

Palm Springs Landfill Remediation Oversight Project, City of Palm Springs, California. Conducted inspections of the former Palm Springs City Landfill. Observed the landfill remediation to identify any deviations from the Remedial Action Plan approved by DTSC.

Corona Property Inert Landfill Investigation, Private Developer, Corona, California. Conducted soil, fill material, and surface water sampling to characterize landfill material prior to excavation and relocation of the material for redevelopment.

Coachella Landfill Closure, City of Coachella, California. Produced a closure and maintenance report for a former landfill in Coachella, California, which included a plan for landfill inspections, monitoring, and maintenance.

City Council 16 – 107 10/18/2022
6 Landfill Post-Closure Maintenance, San Diego and Warner Springs, California. Served as project manager on landfill monitoring and post-closure maintenance sites on Naval Air Station (NAS) North Island and Survival, Evasion, Resistance and Escape Camp in Warner Springs, California. Performed groundwater sampling and water quality evaluation. Updated the post-closure maintenance plan and wrote an annual post-closure maintenance report for each site.

NAS North Island Landfill Methane Monitoring, San Diego, California. Performed methane monitoring at a landfill monitoring site on NAS North Island. Coordinated installation of a methane detection system and calibrated it.

Community Relations
Fact Sheet, San Diego, California. Prepared a fact sheet regarding soil excavation on NAS North Island and transportation through the City of Coronado, California.

Public Meetings, San Diego, California. Participated in several Restoration Advisory Board meetings in Coronado city. Presented status updates on several NAS North Island remediation and investigation activities to the community.

Information Repository, San Diego, California. Provided oversight for maintenance of the NAS North Island information repository.

City Council 16 – 108 10/18/2022
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 3/2013) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(COMPLETE ONE SECTION E FOR EACH KEY PERSON.)

12. NAME 13. ROLE IN THIS CONTRACT 14. Years’ Experience Grace M. Rinck, CIH Certified Industrial Hygienist
a. Total b. With Current Firm
31 24

15. FIRM NAME AND LOCATION (CITY AND STATE)
Aurora Industrial Hygiene, South Pasadena and San Diego, California

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S. Physical Chemistry, UCLA, 1986
M.A. Science Education, California State University Northridge, 1988 Accredited College or University
Certified Industrial Hygienist (CIH), 1994
California Certified Asbestos Consultant, 1993
California Certified Lead Inspector/Risk Assessor/Monitor 1997

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Professional Affiliations American Industrial Hygiene Association (AIHA) Diplomat, American Academy of Industrial Hygiene (AAIH) Governmental Affairs Officer, South California Local AIHA Board Member, California Industrial Hygiene Council
Ms. Rinck has been practicing industrial hygiene for 28 years. Her experience includes developing compliance programs, writing health and safety programs and specifications, and inspecting and evaluating construction and hazardous material projects. She specializes in training and education, having conducted employee health and safety training on the full spectrum of topics, including but not limited to respiratory protection, proper use of personal protective equipment, substance specific hazard communication, bacterial and fungal contamination, confined space, lead, and asbestos. As a former teacher, she has a reputation of providing in depth training classes that are specific to the client’s needs and has been praised often regarding her outstanding abilities in the classroom. Public clients include the County of Los Angeles Departments of Public Works and Internal Services, Southern California Metropolitan Water District, the Housing Authority of the City of Los Angeles, The Cities of Pasadena, and Los Angeles, and Los Alamitos School District. She was on the advisory board for the Los Angeles Section of the American Indoor Air Quality Council (AmIAQ), a professional corporation devoted to the collection and dissemination of indoor air quality (IAQ) information to its members and promoting awareness and education on IAQ issues, for eight years and is currently serving as a board member on the California Industrial Hygiene Council. Her experience in risk communication has been very helpful in adversarial situations where a client needs someone to disseminate information to employees in both large and small group settings.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED VETERAN’S ADMINISTRATION, WEST LOS ANGELES, CALIFORNIA PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) 2019
(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND SPECIFIC ROLE Check if project performed with current firm Aurora is most recently providing a wide range of industrial hygiene services for the VA greater Los Angeles Healthcare system (VA GLAHS). Responsibilities include safety training, risk assessments, indoor air quality assessments, environmental sampling, ergonomic evaluations, laser, and other electromagnetic radiation safety, confined space entry reviews, lockout/tagout, CEOSH 3E database management, safety data sheet maintenance, asbestos, lead, mold surveillance and survey work, air monitoring and any other as needed services. Cost of services is approximately 10K/month. Role: Certified Industrial Hygienist. Cost:

Approximately $ 10,000 per month. Dates: 01/2017 – 07/2019 b.
(1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED Departments of Public Works, Internal Services, Department of Health Services and Department of Public Health, County of Los Angeles

PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE)
Ongoing
(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND SPECIFIC ROLE Check if project performed with current firm City Council 16 – 109 10/18/2022
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 3/2013) PAGE 1 Provides both scheduled and on-call emergency industrial hygiene services to the County of Los Angeles, since 2000 at County owned and managed facilities throughout the 400 square miles that comprise the County of Los Angeles. Has and continues to provide training in confined space, hearing conservation, respiratory protection, fall protection, construction safety, HAZWOPER and first responder, lead, asbestos, mold, and industrial hygiene. Reviews health and safety procedures and assists the county in developing safe work procedures at both routine – traffic painting, guardrail removal, sewer and water line maintenance to the unusual – well maintenance, downstream dam control painting, flood control bacteria safety protocols, and even drug investigations. Facility inspections have ranged in size from entire dams to sheds. Provides indoor air quality inspections in office buildings, measured a diverse number of environmental hazards, including bacteria, mold, asbestos, lead, heavy metals, pesticides, organic compounds, noise, and non-ionizing radiation. Over the last ten years, Ms. Rinck has reviewed contractor HASPs for construction projects at Big Tujunga, San Gabriel, and San Dimas dams as well as smaller projects like the Blanchard Slope reformation project and construction projects at county maintenance, water works, sewer, flood maintenance and office buildings. Every year, she conducts asbestos training, which includes respiratory fit testing, for the 300+ Internal Services Department tradespersons who maintain the county owned buildings, as well as Department of Public Works Flood, Road, and Maintenance personnel. Role: Project manager. Cost: Varies. Dates: 01/2013 – ongoing c.
(1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED Industrial Hygiene Services, Housing Authority City of Los Angeles, CA PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) ongoing
(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Rinck has been an industrial hygiene consultant under contract with HACLA since 2005. During that time she has assisted the agency by providing a full range of asbestos and lead services, as well as general industrial hygiene. Tasks have included asbestos and lead specification writing, managing asbestos and lead inspections – office buildings, and multi-unit residential, project management for asbestos and lead abatement and lead stabilization oversight and monitoring, personnel exposure assessments as well as writing operations and maintenance plans and providing Housing Authority personnel with training. In 2013, Ms. Rinck provided initial Asbestos Operations and Maintenance Training and respiratory fit testing for over 150 employees. Role: Project manager. Cost: Varies. Dates: 01/2012 - ongoing d.
(1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED Industrial Hygiene Services, AMEC Geomatrix, Los Angeles, CA PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) 2010 x
(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND SPECIFIC ROLE Check if project performed with current firm Provides industrial hygiene support services for large scale industrial site remediation and demolition projects. Projects have included personnel and environmental air monitoring for pesticides, solvents, particulates and heavy metals, and facility hazardous materials inspections In December of 2010, Aurora Industrial Hygiene conducted a hazardous materials inspection (asbestos, lead, PCBs, and other hazardous materials (OHM) for over 20 buildings and structures at the Port Authority of Guam located at Apra Harbor as part of the development of a container terminal port. Role: Project manager. e.
(1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED Industrial Hygiene Services, Waterstone Environmental, Anaheim, CA PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) 2012
(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for providing as-needed industrial hygiene services and consultation. Services have included both environmental and personnel monitoring during abatement of contaminated soil for projects for LAUSD school expansion and construction projects. Conducted work site, perimeter, hazard zone and personnel monitoring for pesticides, heavy metals, volatile organic compounds and particulates as well as recording environmental conditions for worker safety. Role: Project manager.

City Council 16 – 110 10/18/2022
Proposal Title A-2
Appendix B
Certifications
City Council 16 – 111 10/18/2022
Appendix
ATTACHMENT 3-1: NON-COLLUSION AFFIDAVIT

CERTIFICATIONS
City of Santa Ana RFP
Page A3-1

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

Note: The above Non-collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non-collusion Affidavit. BIDDERS are cautioned that making a false certification may subject the certifier to criminal prosecution.

Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of , 20 , by before me.
, proved to me on the basis of satisfactory evidence to be the person(s) who appeared Notary Public Signature Notary Public Seal
City Council 16 – 112 10/18/2022
City of Santa Ana RFP
Page A3-2
Appendix
ATTACHMENT 3-2: NON-LOBBYING CERTIFICATION

CERTIFICATIONS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

1. No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.

2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a “Disclosure of Lobbying Activities”.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly.

Firm
Signed and Printed Name:

Title
Date
Dudek
Joe Monaco
President/CEO
July 25, 2022
City Council 16 – 113 10/18/2022
City of Santa Ana RFP
Page A3-3
Appendix
ATTACHMENT 3-3: NON-DISCRIMINATION CERTIFICATION

CERTIFICATIONS
The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows:

1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.

3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.

6. In the event of the Consultant’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.

7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted City Council 16 – 114 10/18/2022
City of Santa Ana RFP
Page A3-4
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a sub-consultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States.

8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended,
No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.

Signed:

Title:

Firm:

Date:

President/CEO
Dudek
July 25, 2022
City Council 16 – 115 10/18/2022
City Council 16 – 116 10/18/2022
Various Environmental Services Sample Project Budgets 1

PROJECT SCOPE
1 1
ASTM E 1527-21 was released on November 17, 2021. Environmental Protection Agency (EPA) concurrence with the new standard will reportedly take up to one year. Thus, compliance with the All Appropriate Inquiries rule to qualify for an exemption from Comprehensive Environmental Response, Compensation, and Liability Act liability will remain under E 1527-13 until EPA concurs with the new standard.

City Council 16 – 117 10/18/2022
Various Environmental Services Sample Project Budgets 2 City Council 16 – 118 10/18/2022 Various Environmental Services Sample Project Budgets 3 Table 1. Scope of Work Estimated Costs
2245 S. Halladay Street
Phase I ESA
Dudek Labor $6,120
Other Direct Costs (records searches, environmental lien and activity use limitation search, mileage for site visit) $810
Subtotal $6,930
Hazardous Materials Building Survey
Labor $2,240
Vendor $525
Other Direct Costs (XRF meter) $350
Subtotal $3,115
PROJECT TOTAL $10,045
Sample Project: 2245 S. Main Street

PROJECT SCOPE
The property located at 2245 S. Main Street consists of one approximately 0.27-acre parcel of land on APN 403-141-08. According to information reviewed during the preparation of this scope of work, a gas station formerly operated on the site and a release of gasoline was reported in 1988. Impacts to soil and groundwater were reported at the site; monitoring and remediation efforts were performed for several years. By 2019, the underground storage tanks had been removed from the property and the gas station was demolished. The site was granted regulatory closure under the State Water Resource Control Board’s Low-Threat Closure Policy in March 2022 with the caveat that if the land use changes, a review of the corrective action is required.

The City of Santa Ana currently owns the property. For the purpose of this project scope, Dudek assumes that a land use change to Residential is proposed, which would trigger a corrective action review by the regulatory agency. Although regulatory closure (for commercial use of the property) was granted in March 2022, residual impacts remain at the site, which may exceed regulatory screening levels for residential use. Dudek recommends that a limited Phase II ESA with a human health risk evaluation be performed for the site.

Phase II ESA
Initial Project Review
Dudek will review the existing data for the site to determine an appropriate project approach. According to information reviewed on GeoTracker, concentrations of several volatile organic compounds in soil vapor exceeded regulatory thresholds for residential and commercial land use scenarios. Based on City Council 16 – 119 10/18/2022
Various Environmental Services Sample Project Budgets 4 City Council 16 – 120 10/18/2022 Various Environmental Services Sample Project Budgets 5 Table 2. Phase II ESA Project Cost
2245 S. Main Street
Phase II ESA
Dudek Labor $8,300
Subcontractor Costs $7,900
Other Direct Costs (permit fee, mileage for site visit, air monitoring equipment)
$652
Total $16,852
City Council 16 – 121 10/18/2022
Rate Sheets
City Council 16 – 122 10/18/2022
DUDEK 2022 Standard Schedule of Charges
EFFECTIVE JANUARY 1, 2022
Engineering Services
Project Director ...................................................................... $310.00/hr Principal Engineer lll .............................................................. $285.00/hr Principal Engineer II ............................................................... $275.00/hr Principal Engineer I ................................................................ $265.00/hr Program Manager .................................................................. $255.00/hr Senior Project Manager ......................................................... $255.00/hr Project Manager ..................................................................... $245.00/hr Senior Engineer III .................................................................. $240.00/hr Senior Engineer II .................................................................. $230.00/hr Senior Engineer I ................................................................... $220.00/hr Project Engineer IV/Technician IV ......................................... $210.00/hr Project Engineer llI/Technician III .......................................... $200.00/hr Project Engineer lI/Technician II............................................ $185.00/hr Project Engineer I/Technician I ............................................. $165.00/hr Senior Designer II ................................................................... $190.00/hr Senior Designer I .................................................................... $185.00/hr Designer ................................................................................. $175.00/hr Assistant Designer ................................................................. $170.00/hr CADD Operator III ................................................................... $165.00/hr CADD Operator II .................................................................... $155.00/hr CADD Operator I ..................................................................... $140.00/hr CADD Drafter .......................................................................... $125.00/hr CADD Technician .................................................................... $115.00/hr Project Coordinator ................................................................ $145.00/hr Engineering Assistant ............................................................ $120.00/hr Environmental Services
Project Director................................................................................. $255.00/hr Senior Specialist IV........................................................................... $235.00/hr Senior Specialist III .......................................................................... $225.00/hr Senior Specialist II ........................................................................... $210.00/hr Senior Specialist I ............................................................................ $195.00/hr Specialist V........................................................................................ $185.00/hr Specialist IV....................................................................................... $175.00/hr Specialist III ...................................................................................... $165.00/hr Specialist II ....................................................................................... $150.00/hr Specialist I ........................................................................................ $140.00/hr Analyst V ........................................................................................... $130.00/hr Analyst IV .......................................................................................... $115.00/hr Analyst III........................................................................................... $105.00/hr Analyst II............................................................................................... $95.00/hr Analyst I................................................................................................ $85.00/hr Technician III ....................................................................................... $75.00/hr Technician II ........................................................................................ $65.00/hr Technician I ..........................................................................................$55.00/hr Mapping and Surveying Services
Application Developer II .................................................................. $195.00/hr Application Developer I ................................................................... $155.00/hr GIS Analyst V .................................................................................... $205.00/hr GIS Analyst IV ................................................................................... $165.00/hr GIS Analyst III.................................................................................... $145.00/hr GIS Analyst II..................................................................................... $130.00/hr GIS Analyst I...................................................................................... $115.00/hr UAS Pilot ........................................................................................... $115.00/hr Survey Lead ..................................................................................... $185.00/hr Survey Manager .............................................................................. $135.00/hr Survey Crew Chief............................................................................ $115.00/hr Survey Rod Person............................................................................. $95.00/hr Survey Mapping Technician.............................................................. $95.00/hr Construction Management Services
Principal/Manager ................................................................. $195.00/hr Senior Construction Manager ............................................... $185.00/hr Senior Project Manager ......................................................... $175.00/hr Construction Manager ........................................................... $160.00/hr Project Manager ..................................................................... $150.00/hr Resident Engineer ....................................................... …….….$150.00/hr Construction Engineer............................................................ $150.00/hr On-site Owner’s Representative ............................................ $140.00/hr Prevailing Wage Inspector ..................................................... $139.00/hr Construction Inspector ........................................................... $135.00/hr Administrator/Labor Compliance .......................................... $100.00/hr Hydrogeology/HazWaste Services
Project Director ...................................................................... $305.00/hr Principal Hydrogeologist/Engineer II ..................................... $280.00/hr Principal Hydrogeologist/Engineer I ...................................... $260.00/hr Senior Hydrogeologist V/Engineer V .................................... $240.00/hr Senior Hydrogeologist IV/Engineer IV ................................... $230.00/hr Senior Hydrogeologist III/Engineer III .................................... $220.00/hr Senior Hydrogeologist II/Engineer II ...................................... $210.00/hr Senior Hydrogeologist I/Engineer I ....................................... $200.00/hr Project Hydrogeologist V/Engineer V .................................... $185.00/hr Project Hydrogeologist IV/Engineer IV .................................. $175.00/hr Project Hydrogeologist III/Engineer III ................................... $165.00/hr Project Hydrogeologist II/Engineer II ..................................... $155.00/hr Project Hydrogeologist I/Engineer I ....................................... $145.00/hr Hydrogeologist/Engineering Assistant .................................. $120.00/hr District Management & Operations
District General Manager....................................................... $210.00/hr District Engineer ..................................................................... $205.00/hr Operations Manager ............................................................. $160.00/hr District Secretary/Accountant .............................................. $135.00/hr Collections System Manager ................................................. $135.00/hr Grade V Operator ................................................................... $125.00/hr Grade IV Operator .................................................................. $110.00/hr Grade III Operator .................................................................. $100.00/hr Grade II Operator ..................................................................... $80.00/hr Grade I Operator ...................................................................... $75.00/hr Operator in Training ................................................................. $75.00/hr Collection Maintenance Worker ............................................. $75.00/hr Creative Services
Creative Services IV ............................................................... $165.00/hr Creative Services III ............................................................... $150.00/hr Creative Services II ................................................................ $135.00/hr Creative Services I ................................................................. $120.00/hr Publications Services
Technical Editor lV ................................................................. $165.00/hr Technical Editor lll .................................................................. $150.00/hr Technical Editor ll ................................................................... $135.00/hr Technical Editor l .................................................................... $120.00/hr Publications Specialist lV ....................................................... $120.00/hr Publications Specialist lll ....................................................... $110.00/hr Publications Specialist ll ........................................................ $100.00/hr Publications Specialist l ........................................................... $90.00/hr Clerical Administration ............................................................. $90.00/hr Forensic Engineering – Court appearances, depositions, and interrogatories as expert witness will be billed at 2.00 times normal rates.

Emergency and Holidays – Minimum charge of two hours will be billed at 1.75 times the normal rate.

Material and Outside Services – Subcontractors, rental of special equipment, special reproductions and blueprinting, outside data processing and computer services, etc., are charged at 1.15 times the direct cost.

Travel Expenses – Mileage at current IRS allowable rates. Per diem where overnight stay is involved is charged at cost
Invoices, Late Charges – All fees will be billed to Client monthly and shall be due and payable upon receipt. Invoices are delinquent if not paid within 30 days from the date of the invoice. Client agrees to pay a monthly late charge equal to 1% per month of the outstanding balance until paid in full.

Annual Increases – Unless identified otherwise, these standard rates will increase 3% annually.

The rates listed above assume prevailing wage rates does not apply. If this assumption is incorrect Dudek reserves the right to adjust its rates accordingly.

City Council 16 – 123 10/18/2022
City Council 16 – 124 10/18/2022
City Council 16 – 125 10/18/2022
City Council 16 – 126 10/18/2022
City Council 16 – 127 10/18/2022
City Council 16 – 128 10/18/2022
City Council 16 – 129 10/18/2022
City Council 16 – 130 10/18/2022
City Council 16 – 131 10/18/2022
City Council 16 – 132 10/18/2022

EXHIBIT A
City Council 16 – 133 10/18/2022

REQUEST FOR PROPOSALS (RFP)
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO.: 22-090

CITY OF SANTA ANA
Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Kenny Nguyen
Project Manager
(714) 647-5632 Office
[email protected]

KEY RFP DATES (Subject to change at discretion of City):

Issue Date: June 30, 2022
Deadline for Requests for Information: July 19, 2022
Proposal Due Date: August 01, 2022 at 2pm
Projected Award Date: Fall 2022
City Council 16 – 134 10/18/2022
City of Santa Ana RFP 22-090
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO. 22-090

INTRODUCTION/PROJECT BACKGROUND
The City of Santa Ana is issuing this Request for Proposals (RFP) to seek qualified firms to provide Various Environmental Services for the City of Santa Ana Public Works Agency on an as-needed or “on-call” basis. From the proposals received, it is the City’s goal to select up to three (3) firms. The City will enter into separate agreements with each firm for an aggregate not to exceed amount of
It is the City’s goal to select one or more firms to enter into an agreement(s) with to provide as needed property management services for capital improvement projects (CIP). The capital improvement projects needing the right-of-way services include, but are not limited, to Warner Avenue, Bristol Street, Fairview Street, and Grand Avenue Street Improvements.

Specialty Areas Maximum Contract
Aggregate Amount
I Environmental Site Assessment $135,000
II Hazardous Materials Surveys $135,000
Consultants are encouraged to prepare proposals for the multiple specialty areas listed above, however; it is not required to propose on more than one Specialty Area. Each Specialty Area shall be submitted individually in response to the RFP. From the proposals received, it is the City’s goal to select one to two firms for each of the specialty services (I and II). The City will enter into separate agreements (the “Agreement”) with each of these firms. Work will be assigned by Contract Task Orders. As tasks are identified, they will be distributed among these firms based upon their ability to perform the required work within the project schedule and budget constraints.

A detailed scope of work and corresponding fee will be outlined when a specific task is assigned to a consultant. The City reserves the right to distribute the work in any manner which will best serve the City’s interests.

MINIMUM QUALIFICATIONS
City Council 16 – 135 10/18/2022
City of Santa Ana RFP 22-090
Page A1-2
Consultants must demonstrate the minimum qualifications as established in the California Department of Transportation (Caltrans) Right of Way Manual, which can be accessed at:
http://www.dot.ca.gov/hq/row/rowman/manual/index.htm.

Consultants must demonstrate ability to have successfully negotiated and closed escrow on acquisition of parcels and minimized the eminent domain process on similar projects.

DESCRIPTION OF WORK
Consultants under contract with the City of Santa Ana will provide support to City of Santa Ana staff or their designee on an as-needed basis. The Consultants shall be thoroughly familiar with the Statement of Work prior to submitting a response to this Request for Proposal (RFP).  The Consultant shall perform work to produce a high quality, professional and complete work product.
 Consultant must have experience with State and Federally funded projects. All work shall be performed in conformance with all applicable regulations, policies, procedures and standards.
 Work may include, but is not be limited to, the following:
o onsite review of the project area
o review of existing records
o conducting research and pre-demolition surveys
o performing analysis
o information gathering
o collect site samples
o lab testing and evaluation for the potential presence and extent of contaminants/hazardous materials
o preparing reports documenting all sampling activities o analytical results and recommendations for future action o providing cost estimates for the recommended actions
o attend community meetings as needed
 The Consultant shall carry out the instructions received from the City and shall cooperate with the City and other agencies.
 The Consultant has total responsibility for the accuracy and completeness of the work produced. The work will be reviewed by the City for conformity with the requirements of the Agreement. Reviews by the City may NOT include a detailed review for the accuracy of items submitted. The responsibility for accuracy and completeness of such items remains solely that of the Consultant.
 The Consultant shall be responsible for coordination and supervision of all work performed by its sub-consultants. The Consultant shall review all work performed by its sub-consultants and the responsibility for accuracy and completeness of work performed remains solely that of Consultant. Sub-consultant markup is not allowed in this contract.  The Consultant shall have a Quality Control Plan in effect during the entire time work is being performed under the Agreement. The Quality Control Plan shall establish a process City Council 16 – 136 10/18/2022
City of Santa Ana RFP 22-090
Page A1-3
whereby work products are independently checked, corrected and back checked. All project related correspondences and documents shall be maintained and bound in appropriate project files. Additionally, all electronic files shall conform to the City’s file naming system.
 The Consultant shall diligently work on each assignment and complete each task in accordance with the schedule and accommodate the City’s needs.  The Consultant’s work will be subject to inspection and audit by City, County, State and Federal representatives
 Consultant’s Project Manager and critical staff must attend the monthly meetings with City Staff and other consultants requested by the City to review project progress, the schedule and any critical issues/items and the follow up action items necessary. All status reports must be submitted ahead of the meetings.
 Consultant must prepare a Weekly Status report and submit to the City. Format and specific items of each status report must be reviewed and approved by the City.  Consultant must maintain electronic files of all the project parcels and correspondence including all reports generated by other related consultants required to perform acquisition/relocation and property management services.  All electronic submittals of files must be through a shared folder. Consultant must upload and keep current the project parcel information and files in the shared folder established for the project.
 Consultant must prepare electronic files of the parcels according to the Caltrans Review Process for right-of-way Certification.
 Project files including copies of all correspondences, reports, documents, and electronic files shall be submitted to the City when requested and electronically updated as requested by the City.
 All work, including reports, analysis, data, and intellectual properties developed during the life of the Agreement shall become the properties of the City.  The Consultant will receive written notification of the award of the contract. Upon such notification, the Consultant will proceed with the services required by the Agreement.

PAYMENT AND INVOICING:

Selected Consultant shall invoice the City based on time and material according to the City’s standard invoice template. Tasks and hours shall be clearly identified and all rates must match those included in the approved agreement. City shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

Each invoice must include a Consultant Progress Report that contains tasks and activities completed and summary of work in the next month period. Certificate of insurance must be current in order for invoices to be processed.
(I) ENVIRONMENTAL SITE ASSESSMENT
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include City Council 16 – 137 10/18/2022
City of Santa Ana RFP 22-090
Page A1-4
but not limited to:
 Investigate the historical uses of the projects site by examining available historical aerial photographs, topographic maps, Environmental Data Resources (EDR radius shall be at least one mile from the project limits) and other available documentation for evidence of potential environmental concerns (both surface and subsurface) associated with prior land uses.
 Interview the current and former owners and occupants of the properties and other knowledgeable persons (including adjacent residents/occupants, as well as applicable local government officials) to identify historical operations conducted on the project site and adjacent properties.
 Research and investigate area for geology and subsurface/surface potential for pollutant transport from public sources.
 Prepare Phase I ESA report detailing the findings through inspections and interviews, site characteristics, record and historical review information and potential contamination issue, interpretation of the findings and recommendations for any work required.

Phase II Environmental Site Assessment
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include but not limited to:
 Collect soil and water samples of the project site.
 Conduct subsurface soil borings.
 Perform geophysical testing for buried/underground storage tanks and drums.  Install groundwater monitoring well and analyze the presence of contamination. Depending on the results of the samples, additional site investigation and potential remedial actions may be required.  Prepare Phase II ESA report detailing the compilation and analysis of the data collected, interpretation of the findings and recommendations for any work required.  Coordinate with local government officials and/or contractor to conduct the necessary sample collection, submit the required forms/reports and obtain the complete hazardous closure certification.
(II) HAZARDOUS MATERIALS SURVEYS
Pre-demolition Hazardous Materials Surveys
Consultant shall perform pre-demolition survey for hazardous and contaminated building materials. These tasks shall include but not limited to:
 Perform the necessary hazardous materials survey (including but not limited Asbestos and Lead Based Paint) and collect bulk samples to identify and quantify all potential hazardous, contaminated, or other materials, including materials and abandoned or waste materials, which may be regulated or otherwise require special consideration or disposal arrangements during, or prior to, demolition of the building.
 Prepare the Asbestos-Containing Materials (ACM), Lead Based Paint (LBP), Universal Waste and any other necessary survey reports to comply with State and Federal requirements.

CITY RESPONSIBILITIES:

City Council 16 – 138 10/18/2022
City of Santa Ana RFP 22-090
Page A1-5
The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein.
 Facilitate meeting spaces and coordination with City staff  Access to City facilities
CONSULTANT RESPONSIBILITIES:
 Provide all required insurance as outlined in Attachment 2 of this RFP.  Submit renewal of Certificate of Insurance 30 days before expiring.  Ensure Certificate of Insurance is current when submitting invoices.

SPECIAL REQUIREMENTS (ATTACHMENT 4)
This project may utilize California Department of Transportation (Caltrans) funds and shall therefore comply with all state and federal requirements. The below referenced forms included in Attachment 4 (Additional Provisions) of the Appendix must be completed in their entirety and submitted with your proposal:
 LAPM Exhibit 10-H: Sample Cost Proposal
 LAPM Exhibit 10-O1: Consultant Proposal DBE Commitment  LAPM Exhibit 10-O2: Consultant Contract DBE Commitment (include within Fee Proposal hard copy package)
 LAPM Exhibit 10-K: Consultant Certification of Contract Costs and Financial management System (include within Fee Proposal hard copy package) for Speciality Area A only.

Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf COMPLIANCE WITH REQUIREMENTS OF FUNDING AGENCY:

This agreement may be funded with state and/or federal grant funds administered by Caltrans.

Proposer shall comply with all requirements as they pertain to the use of these funds. Refer to Attachment 4 for Caltrans required forms, including Exhibit 10-H – Sample Cost Proposal (H2 for On-Call Contracts) in the Appendix of this RFP.

DISADVANTAGED BUSINESS ENTERPRISES (DBE) GOAL:

The Agency has established a DBE goal for this Contract. Proposers are encouraged to obtain DBE participation for this contract. Refer to Exhibit 10-I – Notice to Proposers DBE Information included in the Appendix of this RFP. Proposers must submit Exhibits 10-O1 & 10-O2 – Consultant Proposal & Contract DBE Commitment to demonstrate compliance with Agency’s DBE goal.

City Council 16 – 139 10/18/2022
City of Santa Ana RFP 22-090
Page A1-6
CONSULTANT AUDIT AND REVIEW PROCESS:
(Speciality Area A - Acquisition/Relocation only)
Prior to contract award and dependent on contract award amount, the selected Consultant(s) shall be subject to an audit or review by Caltrans’ Audit and Investigations (A&I), other state audit organizations, or the federal government. The selected Consultant(s) shall complete Exhibit 10-K – Consultant Annual Certification of Indirect Costs and Financial Management System for all prime and sub-consultants in the Appendix of this RFP.

To independently download any of the Caltrans Exhibits required per this RFP, visit:
https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms City Council 16 – 140 10/18/2022
August 1, 2022
Various Environmental Services
RFP No. 22-090
Prepared for
City of Santa Ana
Public Works Agency
Proposal Proposal
Celebrating 60+ Years of Solutions You Can Build On
www.leightongroup.com
City Council 16 – 141 10/18/2022

SCOPE OF SERVICES & SCHEDULE
City Council 16 – 142 10/18/2022
9 SCOPE OF WORK
Phase I Environmental Site
Assessments (ESA)
Leighton will complete Phase I ESAs in
conformance with the American Society for Testing
and Materials (ASTM) International standard E
1527-21, All Appropriate Inquiries (AAI) 40 CFR
Part 312, November 1, 2005, and, if required,
Caltrans Project Development Procedures Manual,
Chapter 18. Phase I ESAs completed by Leighton
will include at a minimum: Records Review, Site
Reconnaissance, Interviews, Report Preparation.

All Phase I ESAs will include conclusions specific to
the particular project as well as recommendations
for additional investigation (Phase II ESA) as
applicable. Phase I ESAs will be completed under
the direction of registered professionals, including
Environmental Professionals as required by AAI.

Leighton will adhere to pertinent new regulatory
requirements as applicable during the course of
the contract, including those of E2600-10 for Tier 1
Vapor Encroachment Screening and as directed by
the City.

Interviews of tenants and or property owners will
be completed with the City’s authorization. Upon
receipt of your authorization, we will make initial
contact with property owners to conduct interviews
of present and/or past owners, lessees, and
employees (if they are available and cooperative).

Our goal is to move your project forward—not
introduce impediments. We will do everything
possible to work within the unique sensitivities of
each specific project.

Phase II ESA
Leighton understands that remedial investigations/
site characterizations may be required for
properties identified as having potential
contamination in the performance of a Phase
I ESA, properties involved in acquisitions,
construction improvements or development. The
primary goals of an environmental site investigation
are to assess the nature and extent of any impacts,
quantify the approximate mass of contamination,
evaluate potential risk to human health or the
environment, and provide recommendations for
further investigation or remedial action, if required.

Based upon our experience in California, the
typical contaminants in soil and/or groundwater
include petroleum hydrocarbons, volatile organic
compounds (VOCs), semi-volatile organic
compounds (SVOCs), polychlorinated biphenyls
(PCBs), Organochlorine Pesticides (OCPs) and
heavy metals, but the potential for additional
contaminants does exist.

Leighton will employ a variety of technical approaches
to expedite site assessment activities. The selection
of the most appropriate assessment approach will
be based upon City goals, site access and schedule.

Each project is different and Leighton will make it a top priority to work with the City to find the most technically feasible, sustainable, and cost-effective approach to
each project, with site closure and/or construction
completion as the final goal. Tools and investigation
techniques that Leighton typically employ include the
following:
• The use of geo-located current and historical aerial
photographs combined with hand-held GPS units
allow for more accurately targeted investigations in
the field.
• Soil vapor surveys, which provide excellent real time data that can pinpoint potential sources warranting
further soil or groundwater sampling.
• The use of direct-push borings for investigation
of soils and groundwater which nearly eliminates
the costs associated with the characterization and
disposal of investigation-derived wastes.
• Determination of site specific cleanup levels by
establishing background levels prior to or during
the investigation using screening methods such
as XRF. This can help limit additional delineation
requirements and reduce the overall investigative
cost.
• The use of Rapid Optical Cone Penetrometer
(CPT) or Rapid Optical Screening Tool (ROST)
technologies to screen soils for the presence of
petroleum hydrocarbons.
• Employing forensic chemical studies using
chromatographic finger printing, chemical ratio
comparisons, degradation by-product and isotope
age dating, off-site source reviews and area-wide
groundwater gradient interpretation to assess
sources of historical chemical releases.
• The use of mobile laboratories to expedite field
decisions.
• The use of closed circuit television (CCTV) to
investigate and map (using subsurface sounding
and surface survey) subsurface utilities as potential
conduits or release points allowing for forensic
engineering analysis of these structures and
City Council pinpointing of release locations. 16 – 143 10/18/2022 10 Leighton recommends a kick-off meeting prior to
initiating any Site Investigations to establish project priorities and identify restrictions. Prior to the meeting, we will review any available background information
so we are prepared to discuss investigative
methodologies applicable to the particular project.

Based on the results of this meeting, we will
develop a Work Plan for the field investigation. All
investigations will be completed under the direction of a Professional Geologist (PG), Professional Engineer
(PE), Certified Hydrogeologist (CHG), or Certified
Engineering Geologist (CEG), in accordance with
the requirements and applicable governing oversight
agency such as LARWQCB, DTSC or local CUPAs.

The Work Plan will be based upon our review of
site conditions and meetings/discussions with the
City. Each Work Plan will include a specific technical
scope of work developed to best suit the needs of the
project. A draft of the Work Plan will be submitted to
the City’s Project Manager for review. Once approved
by the City, the final Work Plan will be submitted to
the appropriate agencies for review and approval, if
required. All Work Plans will be reviewed and signed
by an appropriate licensed professional (PG or PE)
before field implementation.

Investigative methods described in the Work Plan
may include one or more of the following:

Waste Profiling: Containers of unknown contents
are often discovered on industrial facilities associated with properties. Leighton’s team is well trained and
equipped to perform inspection, profile sampling,
and characterization of chemical storage containers,
such as tanks, drums, and other vessels. We realize
that these assessments are often required on an
expedited basis and our staff is prepared to respond
immediately to your needs.

Geophysical Investigations: When appropriate,
Leighton will work with approved subcontractors
to complete geophysical surveys. Subsurface
geophysical techniques can also be applied to screen
locations prior to other invasive work, such as drilling and trenching.

Direct Push Soil Sampling/Soil Gas Surveys:

Leighton has completed hundreds of soil,
groundwater, and soil gas investigations using
direct push field equipment to evaluate the
presence, concentrations, and extent of petroleum
hydrocarbons, heavy metals, VOCs, methane and
other contaminants that may be encountered on
properties. This technology has been increasingly
important in recent years due to concerns of potential
vapor intrusion into above-ground structures and
is often a critical component of evaluating potential
health risks. Our personnel are well versed in the
implementation of this technology as well as the
evaluation of the data generated and will oversee
direct push drilling subcontractors in the completion
of soil gas investigations, when required. Soil gas
investigations will be completed in accordance
with RWQCB/DTSC guidelines and requirements.

When necessary, Leighton will work closely with Dr.

Heriberto Robles of Enviro-Tox Services to assess
the potential for vapor intrusion into buildings/
structures and the associated health risks of
identified contaminants.

Trenching: Trenching is a cost-effective alternative
often used for shallow soil characterization and
to assess presence of or levels of contamination.

Trenching activities will be supervised by Leighton
personnel, under our current Cal/OSHA trenching
permit. If potentially contaminated soils are
encountered during excavation, Leighton will first
notify the City, and then once approved accordingly
notify the South Coast Air Quality Management
District (AQMD) under our various locations Rule
1166 permit for soil excavation, or other applicable
agencies, depending on the project location.

Drilling: We understand that drilling soil borings
or installing groundwater monitoring wells may be
required under this contract. Having significant
experience in California spanning more than 57
years, we understand the regional subsurface
geologic and hydrogeologic conditions and can
select the most appropriate drilling methods for
each project based upon this knowledge. On most
properties, we would utilize a direct push rig to
collect soil and initial grab groundwater samples.

This field methodology is less intrusive and
considerably more cost-effective than drilling with
hollow-stem auger drill rigs, and generates relatively
little investigation derived waste (IDW) for disposal.

Where permanent groundwater monitoring wells
are required, Leighton will primarily use hollowstem auger drilling equipment to advance soil borings for well installation. We have overseen
the installation of thousands of groundwater
monitoring wells from single completions in shallow
water bearing units to multi-nested completions
in confined and multilayered aquifers. We have
designed and installed monitoring wells intended
for the recovery of various contaminants including
petroleum hydrocarbons, VOCs, various light nonaqueous phase liquids (LNAPLs – floating product), dense non-aqueous phase liquids (DNAPLs),
and other dissolved compounds. Prior to any
monitoring well installation, Leighton will obtain
necessary permits from the appropriate regulatory
agencies and register wells with the Department of
Water Resources (DWR) as required. Drilling will
be performed under the oversight of a PE or PG
registered in the State of California.

City Council 16 – 144 10/18/2022
11 Sampling: Soil and or groundwater sampling will
be conducted in accordance with federal, state,
and local guidelines with the objective of obtaining
representative samples of the subsurface materials.

No two projects are alike, each requiring a thorough
review of background information to establish an
appropriate sampling plan. Some projects will allow
for standard 3-volume well purging, while others
call for low-flow purging. Leighton will include a
site-specific sampling plan as part of the work plan.

This sampling plan will identify the media to be
sampled (e.g., soil, water, soil gas, etc.), the sampling procedures (e.g., drilling, trenching, push probe,
monitoring well, etc.), the sample container (e.g.,
glass jars, brass sleeves, Encores™, VOA vials, etc.),
preservatives, sample handling, QA/QC objectives
and chain-of-custody procedures.

Decontamination/Disposal and Manifesting: Field
equipment including drilling equipment, sampling
materials and anything that may be introduced into
the soil or groundwater will be decontaminated before
use and between sampling points by washing in
a mixture of liquinox (or similar) and water, rinsing
in potable water, final rinsing with deionized water
and be allowed to air dry. Investigation derived
waste (IDW) and soil/groundwater generated during
field investigations will be contained in 55-gallon
DOT approved drums, appropriately labeled and
transported under manifest to a permitted waste
handling facility. Waste manifests will be signed by
the City prior to transportation of the waste.

Leighton will not store any hazardous substances
for more than ninety (90) days, will not permit any
accumulations in excess of the small quantity
generator exclusion of 40 CFR Part 261, and will
report to the appropriate regulatory agency any
discharges or releases identified, but only upon
approval from the City.

Quality Assurance/Quality Control
Quality Assurance/Quality Control is a vital part of any site investigation. Field activities will be conducted
in accordance with the Leighton corporate QA/QC
Plan. In addition, we will perform our services in
accordance with project specific QA/QC requirements
as addressed during the initial kick-off meeting for
the project. Laboratory QA/QC will be performed
for each method of analysis as required for the test
method. The QA/QC data will be reported in summary
form and include a description of the constituent, the
specific test method, the date, the detection limit of
the specific test method, the percent accuracy, the
percent precision, and the signature of the laboratory
manager or director. These forms will be included
in the laboratory reports included as appendices
to the final site investigation reports. Technical
reports will be signed and stamped by a PG or PE.

As an additional QA/QC measure, it is Leighton’s’
policy that all technical reports be reviewed by
an independent (in-house) senior registered
professional (PG or PE) not actively engaged in the
project prior to final submittal.

Site Investigation Reports
Leighton will analyze field and laboratory data, and
prepare a detailed site investigation report describing the various tasks of the investigation, including
field and laboratory data, findings, conclusions,
and recommendations. As projects vary in size and
complexity, report format and appropriate illustrations will be discussed with the City before and during
report preparation to ensure the reports will present
the information accurately and effectively, based
upon City needs. All appropriately illustrated reports
(site maps, cross-sections, iso-concentration maps,
groundwater gradient maps, etc.) will be organized
in accordance with the requirements of the RFP and
other project specific requirements. The reports will
be signed by those who prepared it, and signed and
stamped by the California-registered professional
(PG or PE) overseeing the project. All technical
reports will be issued draft reports to review and
provide comments, prior to finalization.

City Council 16 – 145 10/18/2022

EXHIBIT B
City Council 16 – 146 10/18/2022

FEE SCHEDULE

TERMS AND CONDITIONS
 Expiration: This fee schedule is effective through
December 31, 2022, after which a 3% escalation
will be applied annually.
 Prevailing Wages: Our fees for prevailing wage
work are based upon California prevailing wage
laws and wage determinations. Unless specifically
indicated in our proposal, costs for apprentice are
not included. If we are required to have an
apprentice on your project, additional fees will be
charged.
 Overtime: Standard overtime rate is per California
Labor Law and is billed at 1.5 or 2 times their
hourly billing rate. Overtime rate for non-exempt
field personnel working on a Leighton observed
holiday is billed at 2 times their hourly billing rate.

Overtime rate for Prevailing wage work is per the
California Department of Industrial Relations (DIR)
determination and is multiplied at 1.5 to 2 times
their hourly billing rate for overtime and doubletime, respectively.  Expert Witness Time: Expert witness deposition
and testimony will be charged at 2 times hourly
rates listed on the previous pages, with a minimum
charge of four hours per day.
 Minimum Field Hourly Charges: For Field
Technicians, Special Inspectors or any on-site
(field) materials testing services:
4 hours: 4-hour minimum charge up to the first
four hours of work
8 hours: 8-hour minimum charge for over four
hours of work, up to eight hours.

Project time accrued includes portal to portal
travel time.
 Outside Direct Costs: Heavy equipment,
subcontractor fees and expenses, projectspecific permits and/or licenses, project-specific supplemental insurance, travel, subsistence,
project-specific parking charges, shipping,
reproduction, and other reimbursable expenses will
be invoiced at cost plus 10%, unless billed directly
to and paid by client.
 Invoicing: Invoices are rendered monthly, payable
within 30 days of receipt in United States dollars.
 Client Disclosures: Client agrees to provide all
information in Client’s possession about actual or
possible presence of buried utilities and hazardous
materials on the project site, prior to fieldwork, and
agrees to reimburse Leighton for all costs related
to unanticipated discovery of utilities and/or
hazardous materials. Client is also responsible for
providing safe and legal access to the project site
for all Leighton field personnel.
 Earth Material Samples: Quoted testing unit
rates are for soil and/or rock (earth) samples
free of hazardous materials. Additional costs will
accrue beyond these standard testing unit rates
for handling, testing and/or disposing of soil
and/or rock containing hazardous materials.

Hazardous materials will be returned to the site
or the site owner’s designated representative at
additional cost not included in listed unit rates.

Standard turn-around time for geotechnicallaboratory test results is 10 working days.

Samples will be stored for 2 months, after which
they will be discarded.

Prior documented notification is required if samples
need to be stored for a longer time. A monthly
storage fee of $10 per bag and $5 per sleeve or
tube will be applied. Quoted unit rates are only
for earth materials sampled in the United States.

There may be additional cost for handling imported
samples.
 Construction Material Samples: After all
designated 28-day breaks for a given sample
set meet specified compressive or other clientdesignated strength, all “hold” cylinders or specimens will be automatically disposed of,
unless specified in writing prior to the 28-day break.

All other construction materials will be disposed of
after completion of testing and reporting.

Fee/2022- X www.leightongroup.com Page 4 of 4
City Council 16 – 147 10/18/2022
1 AGREEMENT TO PROVIDE ON-CALL VARIOUS ENVIRONMENTAL SERVICES:

HAZARDOUS MATERIALS SURVEYS FOR THE CITY OF SANTA
THIS AGREEMENT is made and entered into on this 18th day of October, 2022 by and between A-Tech Consulting, Inc., (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).

RECITALS
A. On June 30, 2022, the City issued Request for Proposal No.: 22-090 by which it sought qualified consultants in the field of Hazardous Materials Surveys for the proposed Various Environmental Services.

B. Consultant submitted a responsive proposal that was among those selected by the City. Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP No. 22-090.

C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.

NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:

1. SCOPE OF SERVICES
On an as-needed basis, and at the City’s sole discretion, Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Scope of Services - Exhibit A, attached hereto and incorporated by reference.

2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for services performed under the Agreement at the rates and charges identified in Exhibit B. Consultant is one of three Consultants selected to provide Hazardous Materials Surveys. The total aggregate amount, among the three consultants, shall not exceed the shared aggregate amount of $135,000 annually during the term of this agreement, including any extension periods. b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City.

City Council 16 – 148 10/18/2022
2 3. TERM
This Agreement shall commence on the date first written above for a three (3) year term with the option for the City to grant up to a two (2) one (1)-year renewals, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.

4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.

6. INSURANCE
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Consultant, his agents, representatives, employees or subcontractors.

MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence.

If a general aggregate limit applies, either the general aggregate limit shall apply separately to this City Council 16 – 149 10/18/2022
3 project/location (ISO CG 25 03 05 09 or 25 04 05 09) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, covering hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.

4. Professional Liability (Errors and Omissions): Insurance appropriate to the Consultant’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate.

If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to this contract, the Consultant’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.

Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City.

Waiver of Subrogation
Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

City Council 16 – 150 10/18/2022
4 Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M.

Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Claims Made Policies
If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work.

Verification of Coverage
Consultant shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been City Council 16 – 151 10/18/2022
5 suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.

9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable.

Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours.

Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.

10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.

City Council 16 – 152 10/18/2022
6 11. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.

12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.

13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail.

This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.

14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Consultants retained by City.

15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination.

In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents City Council 16 – 153 10/18/2022
7 to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.

16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.

17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.

18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.

19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:

To City:

Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
City Council 16 – 154 10/18/2022
8 With courtesy copies to:

Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax: 714-647-5635
To Consultant:

A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.

20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
b. The Agreement is the final and complete agreement and any prior or contemporaneous agreements for similar services between the parties is superseded by this Agreement. This shall not apply where the Parties are currently engaged and Consultant is providing services not contemplated by this Agreement.
c. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
[Signatures on the following page]
Roohi Toosi, Director of Engineering
A-Tech Consulting, Inc.
1640 N. Batavia Street, Suite 112
Orange, CA 92867
City Council 16 – 155 10/18/2022
9 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.

ATTEST: CITY OF SANTA ANA

Kristine Ridge
Clerk of the Council City Manager
APPROVED AS TO FORM:

SONIA R. CARVALHO CONSULTANT:

City Attorney
By:

Jose Montoya Roohi Toosi
Assistant City Attorney Director of Engineering

RECOMMENDED FOR APPROVAL:

Nabil Saba
Executive Director
Public Works Agency
City Council 16 – 156 10/18/2022

EXHIBIT A

SCOPE OF SERVICES
City Council 16 – 157 10/18/2022

REQUEST FOR PROPOSALS (RFP)
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO.: 22-090

CITY OF SANTA ANA
Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Kenny Nguyen
Project Manager
(714) 647-5632 Office
[email protected]
KEY RFP DATES (Subject to change at discretion of City):

Issue Date: June 30, 2022
Deadline for Requests for Information: July 19, 2022
Proposal Due Date: August 01, 2022 at 2pm
Projected Award Date: Fall 2022
City Council 16 – 158 10/18/2022
City of Santa Ana RFP 22-090
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

VARIOUS ENVIRONMENTAL SERVICES
RFP NO. 22-090

INTRODUCTION/PROJECT BACKGROUND
The City of Santa Ana is issuing this Request for Proposals (RFP) to seek qualified firms to provide Various Environmental Services for the City of Santa Ana Public Works Agency on an as-needed or “on-call” basis. From the proposals received, it is the City’s goal to select up to three (3) firms. The City will enter into separate agreements with each firm for an aggregate not to exceed amount of
It is the City’s goal to select one or more firms to enter into an agreement(s) with to provide as needed property management services for capital improvement projects (CIP). The capital improvement projects needing the right-of-way services include, but are not limited, to Warner Avenue, Bristol Street, Fairview Street, and Grand Avenue Street Improvements.

Specialty Areas Maximum Contract
Aggregate Amount
I Environmental Site Assessment $135,000
II Hazardous Materials Surveys $135,000
Consultants are encouraged to prepare proposals for the multiple specialty areas listed above, however; it is not required to propose on more than one Specialty Area. Each Specialty Area shall be submitted individually in response to the RFP. From the proposals received, it is the City’s goal to select one to two firms for each of the specialty services (I and II). The City will enter into separate agreements (the “Agreement”) with each of these firms. Work will be assigned by Contract Task Orders. As tasks are identified, they will be distributed among these firms based upon their ability to perform the required work within the project schedule and budget constraints.

A detailed scope of work and corresponding fee will be outlined when a specific task is assigned to a consultant. The City reserves the right to distribute the work in any manner which will best serve the City’s interests.

MINIMUM QUALIFICATIONS
City Council 16 – 159 10/18/2022
City of Santa Ana RFP 22-090
Page A1-2
Consultants must demonstrate the minimum qualifications as established in the California Department of Transportation (Caltrans) Right of Way Manual, which can be accessed at:
http://www.dot.ca.gov/hq/row/rowman/manual/index.htm.

Consultants must demonstrate ability to have successfully negotiated and closed escrow on acquisition of parcels and minimized the eminent domain process on similar projects.

DESCRIPTION OF WORK
Consultants under contract with the City of Santa Ana will provide support to City of Santa Ana staff or their designee on an as-needed basis. The Consultants shall be thoroughly familiar with the Statement of Work prior to submitting a response to this Request for Proposal (RFP).  The Consultant shall perform work to produce a high quality, professional and complete work product.
 Consultant must have experience with State and Federally funded projects. All work shall be performed in conformance with all applicable regulations, policies, procedures and standards.
 Work may include, but is not be limited to, the following:
o onsite review of the project area
o review of existing records
o conducting research and pre-demolition surveys
o performing analysis
o information gathering
o collect site samples
o lab testing and evaluation for the potential presence and extent of contaminants/hazardous materials
o preparing reports documenting all sampling activities o analytical results and recommendations for future action o providing cost estimates for the recommended actions
o attend community meetings as needed
 The Consultant shall carry out the instructions received from the City and shall cooperate with the City and other agencies.
 The Consultant has total responsibility for the accuracy and completeness of the work produced. The work will be reviewed by the City for conformity with the requirements of the Agreement. Reviews by the City may NOT include a detailed review for the accuracy of items submitted. The responsibility for accuracy and completeness of such items remains solely that of the Consultant.
 The Consultant shall be responsible for coordination and supervision of all work performed by its sub-consultants. The Consultant shall review all work performed by its sub-consultants and the responsibility for accuracy and completeness of work performed remains solely that of Consultant. Sub-consultant markup is not allowed in this contract.  The Consultant shall have a Quality Control Plan in effect during the entire time work is being performed under the Agreement. The Quality Control Plan shall establish a process City Council 16 – 160 10/18/2022
City of Santa Ana RFP 22-090
Page A1-3
whereby work products are independently checked, corrected and back checked. All project related correspondences and documents shall be maintained and bound in appropriate project files. Additionally, all electronic files shall conform to the City’s file naming system.
 The Consultant shall diligently work on each assignment and complete each task in accordance with the schedule and accommodate the City’s needs.  The Consultant’s work will be subject to inspection and audit by City, County, State and Federal representatives
 Consultant’s Project Manager and critical staff must attend the monthly meetings with City Staff and other consultants requested by the City to review project progress, the schedule and any critical issues/items and the follow up action items necessary. All status reports must be submitted ahead of the meetings.
 Consultant must prepare a Weekly Status report and submit to the City. Format and specific items of each status report must be reviewed and approved by the City.  Consultant must maintain electronic files of all the project parcels and correspondence including all reports generated by other related consultants required to perform acquisition/relocation and property management services.  All electronic submittals of files must be through a shared folder. Consultant must upload and keep current the project parcel information and files in the shared folder established for the project.
 Consultant must prepare electronic files of the parcels according to the Caltrans Review Process for right-of-way Certification.
 Project files including copies of all correspondences, reports, documents, and electronic files shall be submitted to the City when requested and electronically updated as requested by the City.
 All work, including reports, analysis, data, and intellectual properties developed during the life of the Agreement shall become the properties of the City.  The Consultant will receive written notification of the award of the contract. Upon such notification, the Consultant will proceed with the services required by the Agreement.

PAYMENT AND INVOICING:

Selected Consultant shall invoice the City based on time and material according to the City’s standard invoice template. Tasks and hours shall be clearly identified and all rates must match those included in the approved agreement. City shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

Each invoice must include a Consultant Progress Report that contains tasks and activities completed and summary of work in the next month period. Certificate of insurance must be current in order for invoices to be processed.
(I) ENVIRONMENTAL SITE ASSESSMENT
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include City Council 16 – 161 10/18/2022
City of Santa Ana RFP 22-090
Page A1-4
but not limited to:
 Investigate the historical uses of the projects site by examining available historical aerial photographs, topographic maps, Environmental Data Resources (EDR radius shall be at least one mile from the project limits) and other available documentation for evidence of potential environmental concerns (both surface and subsurface) associated with prior land uses.
 Interview the current and former owners and occupants of the properties and other knowledgeable persons (including adjacent residents/occupants, as well as applicable local government officials) to identify historical operations conducted on the project site and adjacent properties.
 Research and investigate area for geology and subsurface/surface potential for pollutant transport from public sources.
 Prepare Phase I ESA report detailing the findings through inspections and interviews, site characteristics, record and historical review information and potential contamination issue, interpretation of the findings and recommendations for any work required.

Phase II Environmental Site Assessment
Consultant shall conduct Phase I ESA in compliance with the current standard practices of the American Society for Testing and Materials (ASTM) Standard E1527. These tasks shall include but not limited to:
 Collect soil and water samples of the project site.
 Conduct subsurface soil borings.
 Perform geophysical testing for buried/underground storage tanks and drums.  Install groundwater monitoring well and analyze the presence of contamination. Depending on the results of the samples, additional site investigation and potential remedial actions may be required.  Prepare Phase II ESA report detailing the compilation and analysis of the data collected, interpretation of the findings and recommendations for any work required.  Coordinate with local government officials and/or contractor to conduct the necessary sample collection, submit the required forms/reports and obtain the complete hazardous closure certification.
(II) HAZARDOUS MATERIALS SURVEYS
Pre-demolition Hazardous Materials Surveys
Consultant shall perform pre-demolition survey for hazardous and contaminated building materials. These tasks shall include but not limited to:
 Perform the necessary hazardous materials survey (including but not limited Asbestos and Lead Based Paint) and collect bulk samples to identify and quantify all potential hazardous, contaminated, or other materials, including materials and abandoned or waste materials, which may be regulated or otherwise require special consideration or disposal arrangements during, or prior to, demolition of the building.
 Prepare the Asbestos-Containing Materials (ACM), Lead Based Paint (LBP), Universal Waste and any other necessary survey reports to comply with State and Federal requirements.

CITY RESPONSIBILITIES:

City Council 16 – 162 10/18/2022
City of Santa Ana RFP 22-090
Page A1-5
The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein.
 Facilitate meeting spaces and coordination with City staff  Access to City facilities
CONSULTANT RESPONSIBILITIES:
 Provide all required insurance as outlined in Attachment 2 of this RFP.  Submit renewal of Certificate of Insurance 30 days before expiring.  Ensure Certificate of Insurance is current when submitting invoices.

SPECIAL REQUIREMENTS (ATTACHMENT 4)
This project may utilize California Department of Transportation (Caltrans) funds and shall therefore comply with all state and federal requirements. The below referenced forms included in Attachment 4 (Additional Provisions) of the Appendix must be completed in their entirety and submitted with your proposal:
 LAPM Exhibit 10-H: Sample Cost Proposal
 LAPM Exhibit 10-O1: Consultant Proposal DBE Commitment  LAPM Exhibit 10-O2: Consultant Contract DBE Commitment (include within Fee Proposal hard copy package)
 LAPM Exhibit 10-K: Consultant Certification of Contract Costs and Financial management System (include within Fee Proposal hard copy package) for Speciality Area A only.

Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf COMPLIANCE WITH REQUIREMENTS OF FUNDING AGENCY:

This agreement may be funded with state and/or federal grant funds administered by Caltrans.

Proposer shall comply with all requirements as they pertain to the use of these funds. Refer to Attachment 4 for Caltrans required forms, including Exhibit 10-H – Sample Cost Proposal (H2 for On-Call Contracts) in the Appendix of this RFP.

DISADVANTAGED BUSINESS ENTERPRISES (DBE) GOAL:

The Agency has established a DBE goal for this Contract. Proposers are encouraged to obtain DBE participation for this contract. Refer to Exhibit 10-I – Notice to Proposers DBE Information included in the Appendix of this RFP. Proposers must submit Exhibits 10-O1 & 10-O2 – Consultant Proposal & Contract DBE Commitment to demonstrate compliance with Agency’s DBE goal.

City Council 16 – 163 10/18/2022
City of Santa Ana RFP 22-090
Page A1-6
CONSULTANT AUDIT AND REVIEW PROCESS:
(Speciality Area A - Acquisition/Relocation only)
Prior to contract award and dependent on contract award amount, the selected Consultant(s) shall be subject to an audit or review by Caltrans’ Audit and Investigations (A&I), other state audit organizations, or the federal government. The selected Consultant(s) shall complete Exhibit 10-K – Consultant Annual Certification of Indirect Costs and Financial Management System for all prime and sub-consultants in the Appendix of this RFP.

To independently download any of the Caltrans Exhibits required per this RFP, visit:
https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms City Council 16 – 164 10/18/2022
City of Santa Ana
Integrity | Accountability | Leadership
Innovation | Responsiveness
RFP NO: 22-090 Various Environmental Services
August 1, 2022
City Council 16 – 165 10/18/2022
Proposal for
Various Environmental Services

Page 15 ends

August 1, 2022
Table 1. A-Tech’s Key Personnel at a Glance
Personnel Role Licenses
Percentage
of Time
Years of
Experience
Expertise Select Clients Education
Casandra Williams, CAC, DPH,

CIEC, CEICC
Contract Administer
CAC #05-3892
ACAC #1404017
DPH #3671
10% 28+
Project Monitoring/Management
Client Relationship
OSHA Safety Training
Infection Control Risk Assessments
Garden Grove Unified School District
Roman Catholic Bishop of Orange
Irvine Unified School District
Claremont Mckenna College
Business Administration & Management 2017, Goldman Sachs 10K Small Business
Roohi Toosi, PE
Project Manager
Technical Lead
QA/QC Director
PE CA #91825 25% 7+
Environmental Due Diligence
Phase I & II ESAs
Emerging Contaminants, PFAS
Project Management
LA Community College District
City of Alhambra
Caltrans District 7
Southern California Edison
MSc 2016, Civil and Environmental Engineering, UC Irvine BSc 2009, Petroleum Engineering, Tehran University, Iran Roosevelt Ward, CIH, CSP,
QISP
Health & Safety Director
CIH 11208 CP
CSP - 32397
25% 17+
Industrial Hygiene Monitoring
Environmental Remediation
Indoor Air Quality Assessments
Certified Safety Expert
Searles Valley Minerals
Los Angeles Unified School District
Nevada Power
Edward Clark Generating Station
MSc 2009, Environmental Health , University of Nevada
BS 2003, Occupational Safety & Health, Indiana University Jay Sandoval, CIH ESAs Lead CIH 12379 CP 50% 16+
Environmental Due Diligence
Industrial Hygiene
Phase I & II ESAs
Remedial Design and Construction
Department of Toxic Substances Control
US Army Corps of Engineers
Southern California Edison
Southern California Gas Company
MSc 2010, Environmental Science, Cal-State Fullerton
BA 2022, Environmental Science, UC Irvine
Joe Williams, CAC, DPH Hazardous Material Lead
CAC #14-5269
DPH #19524
50% 15+
HazMat Site Assessments
Public Client Management
Team Coordination and Supervision
Pre-Demolition Surveys
LA Community College District
City of Burbank
Inland Empire Utility Agency
City of Santa Ana
BSc 2008, Sociology, Minor in Business Administration,
Michigan State University, Lansing, MI
Heriberto Robles, PhD, DABT Risk Assessment Expert DABT 25% 39+ Environmental Toxicology
Health Risk Assessment
Air Quality Assessment
Industrial Health and Safety
Southern California International Airport
City of Alameda, Santa Fe Springs,
Torrance
Empire mine (Grass Valley, CA)
PhD 1985, Animal Science and Toxicology, New Mexico State University, Las Cruces, NM
MSc 1983, Animal Science And Toxicology, New Mexico State University, Las Cruces, NM
Patrick Naffah, CIH, DPH Senior Scientist
CIH #12604
CDPH #LRC00008983
50% 6+
Phase I & II ESAs
Solid & HAZ Waste Management
HazMat Site Assessments
Chemical/Oil Spill Prevention
California University of Riverside
Netflix, Inc.

Port of Seattle
Starbucks Corporation
BS 2017, Environmental Science, University of Washington Victoria Lopez, EIT, CAC, DPH Staff Engineer
CDPH #LRC000009214
CAC #22-7057
50% 4+
HazMat Site Assessments
Phase I & II ESAs
Indoor Air Quality Assessments
Pre-Demolition Surveys
Prime Healthcare Management
Burbank Public Works Department
Dignity Health
Superior Court of San Diego
BS 2018, Environmental Engineering, San Diego University City Council 16 – 166 10/18/2022
Proposal for
Various Environmental Services

Page 16 ends

August 1, 2022
Figure 1. A-Tech’s Organizational Chart

City Council 16 – 167 10/18/2022
Proposal for
Various Environmental Services

Page 17 ends

August 1, 2022
d. UNDERSTANDING OF NEED
A-Tech understands that the City of Santa Ana is planning to award contract(s) to qualified firms for providing various environmental assessment services in support of its Capital Improvement Program and other projects. It is our understanding that the required services are divided into two separate categories:
 Category I: Environmental Site Assessments (ESAs)
 Category II: Hazardous Material Surveys
Our approach for this as-needed contract is to designate a single point of contact to the City, who will be managing the daily tasks of awarded projects and ensuring delivery of high-quality products in a timely manner. A-Tech’s project manager is available 24/7 for responding to City’s requests and will coordinate the project requirements with A-Tech Team and staff as soon as the task orders are available.

A-Tech has utilized its 20 years of experience in conducting ESAs and Hazardous Material Surveys along with the RFP, Questions and Answers, and Amendments provided by the City to develop a general approach for successful completion of future projects. The scope of work and schedule for the example requested projects are provided in Section 2.0 of this proposal.

The Phase I ESAs will be conducted in accordance with the “Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process” published by the American Society for Testing and Materials (ASTM 1527-21). A-Tech’s general approach for completion of a successful Phase I ESA includes:
 A review of relevant background information such as the site location relative to major man-made and natural landmarks, and surrounding land use.
 A general review of the geologic, hydrogeologic, hydrologic and topographic conditions as they relate to potential pathways or migration conduits to and from the property. Topography will be noted to the extent visually or physically observed or determined from interviews, as well as the general topography of the area surrounding the Property. The physical setting evaluation will be made utilizing physical observations and the available United States Geological Survey (USGS)

7.5 Minute Topographic Map.
 A review of oil and gas fields in the vicinity of the site.  A compilation of site history and previous land use based on a review of historic aerial photographs dating back to the 1940s, available historic topographic maps, available historic fire insurance maps, and available city directories.
 A review of chain-of-title records to identify possible recorded environmental cleanup liens.  An assessment of the potential for the site to have been impacted by contaminants and/or vapor migration originating from off-site sources based on a review of federal, state, tribal, and local government agency records.
 A review of local municipal records including building permits, and zoning and land use records.

Category I: Phase I Environmental Site Assessment
City Council 16 – 168 10/18/2022
Proposal for
Various Environmental Services

Page 18 ends

August 1, 2022
 An inspection of the site to identify Recognized Environmental Conditions (RECs) that may include indications of the improper handling, storage, or use of potentially hazardous materials.

This task also includes interviews with accessible property owners, tenants, and/or local agency personnel about hazardous materials handling and disposal procedures.  An evaluation of the possible presence of hazardous materials in structures at the site and/or in the subsurface environment beneath the site, with recommendations, if appropriate, for additional investigations or remediation. A cost estimate of additional activities will be prepared and submitted with the Phase I ESA report.
 Request Environmental Data Resources, LLC (EDR) to conduct a search of government records and document potential sources of contamination at or in the vicinity of the property. EDR’s search includes federal, state, local, tribal, and EDR proprietary records for the property and for facilities within the distances per current ASTM practices. EDR will also search for any environmental liens associated with the Property. The list of research will include, but not be limited to, Environmental Protection Agency (EPA) National Priorities List (NPL) and Emergency Response Notification System List (ERNS); the RCRA generators, and treatment, storage and disposal (TSD) facilities list; Comprehensive Environmental Response Compensations, and Liability Information System (CERCLIS); and the State list of Leaking Underground Storage Tank (LUST) sites. Additionally, local governments will be contacted for a file search and review.  An evaluation of potential PFAS sources on site based on available PFAS databases and historical operations at the site.

Our experience with environmental projects for various government organizations informs us that Phase I ESAs may be needed because of acquisition of land or facilities, selling, or leasing facilities, terminating leases, or any other property transactions. The Phase I ESAs may conclude that there are no RECs, in which case the project will be completed, or may trigger additional investigations leading to Phase II ESAs. It is also possible that Phase I ESAs have been conducted by other entities and the City needs to initiate Phase II ESAs with the objective of collecting soil, soil vapor, and groundwater data to further assess the environmental conditions. The systematic approach for conducting Phase II ESAs is briefly described below:

Meeting with the City Staff
The initial review and identification of RECs will be completed during the Phase I ESAs. If a Phase I ESA recommends additional investigation to be conducted at a site, A-Tech will discuss the environmental requirements with the City staff and follow their instructions closely. The findings of the initial review will be discussed with the City to clarify the environmental concerns and to fill in any data gaps. Discussion will also include designation of a regulatory oversight agency, if that is the approach that is advocated for by the City. Potential regulatory oversight agencies include Cities and Counties’ Health or Environmental Departments, the Fire Department, the South Coast Air Quality Management District (SCAQMD), Regional Water Quality Control Boards (RWQCB), Department of Toxic Substances Control (DTSC), EPA Region 9, or other local agencies. It is A-Tech’s practice not to contact Category I: Phase II Environmental Site Assessments
City Council 16 – 169 10/18/2022
Proposal for
Various Environmental Services

Page 19 ends

August 1, 2022
the regulatory agencies unless directed by the client. The initial review and discussions with City may lead to Phase II ESAs.

Preparation of Work Plan
If the Phase II ESA is warranted, A-Tech will prepare a work plan by focusing on the City’s specific requirements and in accordance with ASTM E1903-19. The purpose of the work plan is to have a clear and concise scope of work and the corresponding protocols and methodologies for implementation in accordance with acceptable regulatory guidelines. After review of the work plan by the City, it is submitted to the oversight agency for approval before it can be implemented.

Permitting
Most of the environmental investigation and remediation activities require permitting from various agencies. Certain soil investigations that do not reach groundwater may not require permitting. Most permits are obtained over the counter but permits related to remediation take time depending on the scope. In Orange County a subsurface investigation requires Well Construction, Well Destruction, Test and Exploratory Hole permit from the Orange County Health Care Agency if 1) the boring is deeper than 50 feet (ft); 2) the boring encounters groundwater; and 3) the boring will be open for more than 24 hours. If requested by the City, A-Tech would prepare the application and proceed with securing the permits. Some regulatory agencies may require a work plan along with the application for permitting.

Subcontractor Selection
A-Tech prepares the scope of the work that will be performed by subcontractors (drillers, geophysics, etc.) and requests three subcontractors to bid on. A-Tech recommends the most qualified subcontractor to the City for approval. A-Tech enters into a subcontract agreement with the selected contractor and requires the subcontractor to fulfill the insurance requirements of the City and A-Tech’s stringent health and safety requirements.

Work Plan Implementation
Prior to starting the field work, the City and appropriate regulatory oversight agency will be notified in case inspection is required. A copy of the work plan and health and safety plan will be available on the field. All subcontractors will be required to follow health and safety requirements including their own and any requirements imposed by the City. Daily health and safety briefing will be performed prior to any field work. Daily progress reports will be sent to the City’s designated project manager.

Data Evaluation and Reporting
Upon receipt of analytical data, A-Tech performs an evaluation and interpretation of the data in the context of the regulatory screening levels and guidance provided by the EPA, DTSC, and RWQCBs. The findings determine which of the following course of action is required:
 No further action needed; in which case the report will request site closure.  Additional investigation is needed to further delineate the extent of Chemicals of Potential Concern (COPCs).
 Investigation is completed but remediation is required.

City Council 16 – 170 10/18/2022
Proposal for
Various Environmental Services

Page 20 ends

August 1, 2022
A-Tech prepares a draft report for review by the City and after addressing the comments, the report is suitable for submitting to the regulatory agencies.

Site Characterizations/Remedial Investigations
If the Phase II ESA confirms the presence of contamination in soil or groundwater, Remedial Investigation is required to determine the best available approach for site cleanup. Complete Phase I and II ESAs and additional investigations resulting from them will effectively characterize the physical, biological, and chemical systems existing at a contaminated site, and develop thorough understanding of the site conditions. Based on the findings of the Phase I and II ESAs and in accordance with ASTM E1689-95 (updated in 2014), A-Tech will develop a Site Conceptual Model (SCM). The SCM is a narrative and/or graphical representation of the current understanding of hydrogeologic conditions and contaminant distribution in the soil-water system beneath the Site. The SCM provides a description of migration pathways of the Chemical of Concerns (COC) and the processes and mechanisms that affect the distribution of COCs in soil vapor, soil, and groundwater. The SCM represents: A geologic crosssection of the Site that effectively identifies the soil profile and types of the soil layers (i.e., clay, silt, sand); Depth to groundwater and the hydraulic gradient within the aquifer; Established background concentrations; COCs concentrations and the extent of their plumes; Contaminant transport pathways and human exposure; and Remediation target zone.

After the site is effectively characterized and the SCM is developed, A-Tech will conduct a risk assessment to evaluate the adverse effects of the Site’s current conditions on human health and environment. If human health or the ecosystem is threatened by the contamination, Risk-Based Corrective Action must be selected and implemented in accordance with ASTM E2081-00 (revised in 2015). A-Tech will conduct a Focused Feasibility Study to evaluate various applicable remedial technologies including no action and propose selection of the most appropriate remedial approach. The flowchart provided in Figure 2 demonstrates the processes and sequence of activities that are involved in successful completion of an environmental remediation project that is initiated by the City’s request.

A-Tech proposes to evaluate the potential for chemicals associated with the site to cause adverse effects on human health or environmental receptors in the absence of any remedial action. A-Tech's risk assessment approach is designed to fully utilize existing data and information generated during previous investigations at the site in order to minimize the costs and time required to produce a quality document.

A-Tech’s risk assessments are consistent with the requirements of both the California Department of Toxic Substances Control (DTSC) and the U.S. Environmental Protection Agency (USEPA).

The risk assessment will include the selection of chemicals of potential concern (COPCs), use of critical toxicity factors (i.e., reference doses [RfDs] for non-carcinogens and slope factors for carcinogens) in estimating potential health risks and hazards. RfDs and cancer slope factors developed by the DTSC and USEPA will be used for estimating potential health risks. A report detailing the results of this risk assessment will be prepared in a straightforward format for the review and approval by the regulatory agency. The report will include the justification for the selection of exposure pathways and assumptions necessary to support the estimation of potential health risks and hazards.

Category I: Human Health Risk Assessments
City Council 16 – 171 10/18/2022
Proposal for
Various Environmental Services

Page 21 ends

August 1, 2022
Figure 2. ESA Sequence from Project Initiation to Completion City Council 16 – 172 10/18/2022
Proposal for
Various Environmental Services

Page 22 ends

August 1, 2022
Asbestos Project Management
A-Tech’s Hazardous Material Surveys Lead will assist the City’s project manager in the management of any asbestos projects of any size, developing asbestos testing and sampling plans, providing consultation regarding asbestos regulations and requirements, and scheduling and executing asbestos-related projects.

Asbestos Surveys
Once all pre-field activities are completed, A-Tech’s field personnel will drive to the job site to begin conducting the field activities. A-Tech utilizes trained Certified Site Surveillance Technicians (CSSTs) or Certified Asbestos Consultants (CACs) for all asbestos inspections, operation and maintenance preparation, project monitoring and clearance monitoring services. Each of A-Tech’s field technicians is outfitted with all necessary equipment and supplies to conduct all types of assessments and clearances, including but not limited to microscopes, high and low-flow pumps, moisture meters, sampling media and tools. Additionally, each technician has a company-issued tablet computer to input all field data into our EnviroShare. Based on the project specifications and regulatory requirements and as requested by the City, we will conduct various types of asbestos surveys including, but not limited to, asbestos screening, limited asbestos surveys, path of construction/pre-renovation asbestos surveys, and pre-demolition surveys.

Friable asbestos containing material (ACM), as defined by the U.S. Environmental Protection Agency (EPA) and South Coast Air Quality Management District (SCAQMD), Rule 1403, is a material that, when dry, can be easily pulverized, crushed, or reduced to powder by hand pressure. Non-friable ACM that can potentially be broken, crumbled, pulverized, or reduced to powder during demolition or renovation activities are classified as Class I or Class II, non-friable ACM. To identify suspect friable and non-friable ACM, as required under California law, a California Occupational Safety Health Administration (CAL-OSHA) CSST and/or CAC is required to conduct visual and/or bulk assessments of a structure. During an assessment, our experts will identify homogenous areas of suspected ACMs for purpose of sampling in accordance with current CAL-OSHA, EPA, and Asbestos Hazard Emergency Response Action (AHERA) requirements. The homogeneous areas will be defined with respect to similarities in appearance, age, use, type, color, and/or texture. The condition and estimated quantity of the suspected materials will also be assessed. Once the visual inspection identifies homogeneous areas, bulk samples will be collected from building materials and submitted under standard chain of custody to a laboratory that is fully accredited by National Institute of Standards and Technology (NIST) through participation in the National Voluntary Laboratory Accreditation Program (NVLAP), or a laboratory that participates in the AIHA Laboratory Accreditation Programs, LLC (AIHA), a third-party that is an internationally recognized accreditation body for testing proficiency. We have excellent working relationships with our laboratories and will recommend using them as our subcontractor for City’s asbestos testing projects.

Category II: Asbestos Consulting Services
City Council 16 – 173 10/18/2022
Proposal for
Various Environmental Services

Page 23 ends

August 1, 2022
Asbestos Assessment Reports
Upon receipt of analytical results from the laboratory, A-Tech will prepare an asbestos assessment report that summarizes pre-field activities, field visual inspections, field sampling activities, sampling results, and recommendations. Our asbestos assessment reports will include (but not be limited to) the name of the surveyor, CACs and project manager; methods and procedures that were utilized in sampling and analysis; the date of survey; drawings and photographs of sampling locations; the laboratory qualifications statement; the existing conditions of the facility; a description of any identified ACM; and recommendations regarding asbestos handling and disposal, if needed.

If ACM was identified at the project site, an asbestos abatement work plan will also be prepared and submitted along with the asbestos assessment report that will clearly identify procedures and steps to be followed by the abatement contractors. After internal review and quality control, the draft reports will be reviewed by a professional editor and the editor’s comments will be reviewed and incorporated, as appropriate.

Asbestos Field Monitoring
When a project requires abatement, per regulations the City is required to directly hire an abatement contractor to perform the abatement activities. Once the abatement work plan is finalized, A-Tech’s Lead and CACs will assist the City’s project manager with bid package development and review of the submitted bids. A-Tech is experienced in coordinating, monitoring, and clearing abatement projects to make sure our clients can gain access to work areas in a timely manner. A-Tech will coordinate with the City on each project to ensure all project documentation meets all regulatory requirements. We will make sure that all required oversight agencies’ notifications and documents are submitted by the abatement contractor on time to avoid project delays.

During abatement activities, our experienced field technicians will provide oversight of abatement contractors’ activities and conduct personal and ambient air monitoring for the work area, as necessary.

We will work with the City to maintain the project schedule and can coordinate either with the necessary personnel to schedule clearance tests that will streamline the finalization of the project without lag time.

Our approach allows our client as much or as little involvement as they are comfortable with.

Asbestos Clearance (Close-Out) Report
When the asbestos abatement has been completed, a final visual clearance inspection is conducted followed by air sampling that is analyzed on-site by Phase Contrast Microscopy (PCM) utilizing a laboratory grade microscope, or off-site by Transmission Electron Microscopy (TEM) analysis, as necessary. For asbestos projects, we collect background, ambient and general air samples for on-site PCM analysis. If there is an elevated fiber concentration, we want to know right away to immediately modify engineering controls. When the entire abatement and remediation process is complete, a final close-out document will be prepared upon receipt of analytical results. The report will be delivered via email and/or standard mail based upon the City’s preference. The final close-out document contains, at a minimum, an executive summary indicating methods of work; areas and materials abated; regulatory compliance; sample analysis findings and conclusions. The close-out report would also include (but not be limited to) project diaries, project checklists, permits, air monitoring logs, contractors’ certifications, submittals and/or notifications, digital photographs, final visual inspection forms and clearance letters.

City Council 16 – 174 10/18/2022
Proposal for
Various Environmental Services

Page 24 ends

August 1, 2022
LBP Testing and Assessment
A-Tech utilizes trained Certified California Department of Public Health (DPH) Inspector/Assessors and DPH Project Monitors for all lead inspections, hazard assessments, project monitoring and clearance monitoring services. For Lead Based Paint (LBP) inspections of pre-designated areas, our DPH Certified Inspectors/Assessors, will utilize an X-Ray Florescence (XRF) analyzer and screen all painted surfaces, ceramic, and porcelain components by utilizing Cal-OSHA’s and the U. S. Department of Housing and Urban Development’s (HUD) sampling protocols. If analysis of suspect components using the XRF is not conclusive of presence of LBP, chip samples will be collected and analyzed by an AIHA accredited laboratory, utilizing Flame Atomic Absorption (AAS), in accordance with current regulatory requirements. We will summarize the results and procedures in an LBP Assessment Report that will include (but not limited to) name of the inspector, date of inspection, all the XRF readings and their location logs, paint chip sample collection procedures and locations, results of laboratory analyses and its accreditation statement, and recommendations for next steps. If LBP was identified in any of the materials, an abatement work plan will be prepared and submitted along with the assessment report for execution by the abatement contractor.

LBP Abatement and Monitoring
For lead abatement or paint stabilization activities, we inspect the integrity of the containment, review all applicable notification and/or submittal documentation, review all abatement worker certifications and ensure a copy of the survey and work plan are on site during the work period. The project is monitored continually to ensure no migration of LBP occurs and that proper engineering controls are implemented as well as proper protective equipment are being utilized by the lead abatement contractor throughout the project. Upon completion of the removal/stabilization project, our technicians conduct a final visual clearance inspection and clearance sampling. Upon approval of the visual inspection, clearance wipe or soil sampling is performed and sent to a certified laboratory that will analyze the samples using AAS. If requested, A-Tech will also obtain and submit samples which will be analyzed for Waste Stream Characterization (TCLP, TTLC and STLC) to determine disposal requirements for generated lead waste on a project.

As it was described above, A-Tech’s personnel will assist the City in overseeing abatement contractors’ activities. We will provide air monitoring and consultation on as-needed basis to ensure compliance with all the applicable rules and regulations, such as SCAQMD Rules 1403, 1150, 1166, and 1466. We understand that the City may be required to provide air monitoring during abatement and remediation activities, including but not limited to monitoring for dust, asbestos fiber content, VOCs emission, and any COPCs that might be emitted to the air by site disturbance. We have all the necessary equipment and tools in-house to conduct all the air monitoring requirements of this contract, and our personnel have experience utilizing PM10, using either direct-read or datalogging particle counters, and photoionization detectors (PID). Our qualified consultants will be available 24/7 to provide consultations to the City regarding air monitoring and any other pertinent environmental issues.

Category II: Lead-Based Paint Assessment Services
Category II: Air Monitoring and Consulting
City Council 16 – 175 10/18/2022
Proposal for
Various Environmental Services

Page 25 ends
← All documents from this meeting