AGREEMENT WITH TOWILL, INC., TO PROVIDE ON-CALL PROFESSIONAL LAND

SURVEYING SERVICES FOR THE CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this 2nd day of May 2023 by and between Towill, Inc., a California corporation (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).

RECITALS
A. On October 2, 2019, the City issued a Request for Proposal (“RFP”) No. 19-090, by which it desired to retain a consultant having special skill and knowledge in the field of Professional Land Surveying services on an “on-call” basis for the City’s Public Works Agency.

B. Consultant submitted a responsive proposal that was among those selected by the City. Consultant represents that it is able and willing to provide such services described in the scope of work that was included in RFP No. 19-090.

C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.

NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:

1. SCOPE OF SERVICES
On an on-call basis, and at the City’s sole discretion, Consultant shall perform all tasks, services, and obligations described in the scope of work section included within RFP No. 19-090, including providing all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in the “Scope of Services,” which was included in RFP 19-090 and is attached hereto and fully incorporated herein by this reference as Exhibit A and as more specifically set forth in Consultant’s proposal (excluding fee and cost proposal and resumes), which is attached hereto and fully incorporated herein by this reference as Exhibit B.

2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Exhibit B. Consultant is one of three (3) consultants selected to provide services on an on-call basis under RFP 19-090. The total compensation for these services provided by all such consultants selected under RFP 19-090 shall not exceed the shared aggregate amount of One Million, Five Hundred Thousand Dollars and Zero Cents ($1,500,000) during the term of the Agreement, including any extension periods.
b. Payment by City shall be made within 45 days (forty-five) days following receipt of proper EXHIBIT 6
City Council 16 – 298 5/2/2023

Page 2 of 10 ends

invoice evidencing work performed, subject to City accounting procedures. c. Payment need not be made for work that fails to meet the standards of performance set forth in the Recitals that may reasonably be expected by City.

3. TERM
This Agreement shall commence on the date first written above and terminate on May 1, 2026, unless terminated earlier in accordance with Section 16, below. The term of this Agreement may be extended for up to two (2) one-year periods upon a writing executed by the City Manager and City Attorney.

4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws.

Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

5. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and City Council 16 – 299 5/2/2023

Page 3 of 10 ends

warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.

7. INSURANCE
Prior to undertaking performance of work under this Agreement, Consultant shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below:
a. Minimum Scope and Limit of Insurance
(1) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregatelimit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. (2) Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, hired, (Code 8) and nonowned autos (Code 9), with a limit no less than $1,000,000 per accident for bodily injury and property damage.
(3) Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (4) Professional Liability (Errors and Omissions): Insurance appropriate to the Consultant’s profession, with a limit of no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate.

(5) Broader Coverage: if the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. b. Other Insurance Provisions
(1) Additional Insured Status: The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connectionwith such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at City Council 16 – 300 5/2/2023

Page 4 of 10 ends

least as broad as ISO Form CG 20 10 11 85 or if notavailable, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).
(2) Primary Coverage: For any claims related to this contract, the Consultant’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it. (3) Notice of Cancellation: Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City. (4) Waiver of Subrogation: Consultant hereby grants to City a waiver of any right to subrogation that any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance.

Consultant agrees to obtain any endorsement that may be necessary to affect this waiverof subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(5) Self-Insured Retentions: Self-insured retentions must be declared to and approved by the City. The City may require theConsultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
(6) Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’srating of no less than A:VII, unless otherwise acceptable to the City. (7) Claims Made Policies: If any of the required policies provide claims-made coverage:
i. The retroactive date must be shown, and must be before the date of the contract or beginning of contract work.
ii. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work. iii. If coverage is canceled or non-renewed, and not replaced with another claimsmade policy form with a retroactive date prior to the contract effective date, the Consultant must purchase “extending reporting” coverage for a minimum of five (5) years after completion of work.

City Council 16 – 301 5/2/2023

Page 5 of 10 ends

(8) Verification of Coverage: Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage requiredby this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing allpolicy endorsements to City before work begins.

However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them.

TheCityreservesthe right to require complete, certified copies of allrequired insurance policies,including endorsements required by these specifications, at any time.
(9) Subcontractors: Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(10) Special Risks or Circumstances: City reserves the right to modify these requirements, including limits, based on the nature of therisk, prior experience, insurer, coverage, or other special circumstances.

8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

City Council 16 – 302 5/2/2023

Page 6 of 10 ends

9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultantshall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.

10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable.

Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours.

Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.

11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.

12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.

13. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or City Council 16 – 303 5/2/2023

Page 7 of 10 ends

military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.

14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail.

This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.

15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services that are the subject to this Agreement performed by City personnel or by other contractors retained by City.

16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination.

In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work that fails to meet the standard of performance specified in the Recitals of this Agreement.

17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving City Council 16 – 304 5/2/2023

Page 8 of 10 ends

the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.

18. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.

19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.

20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.

21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:

To City:

Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
City Council 16 – 305 5/2/2023

Page 9 of 10 ends

Fax: 714- 647-6956
With courtesy copies to:

Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
To Consultant:

Towill, Inc.

Attn: Marvin E. Miller, Regional Director
500 S. Main Street, Suite 540
Orange, CA 92868
(949) 261-1900
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.

ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Kristine Ridge
City Clerk City Manager
APPROVED AS TO FORM:

SONIA R. CARVALHO CONSULTANT:

City Attorney
By:

Brandon Salvatierra Marvin E. Miller
Deputy City Attorney Regional Director
[signatures continued on next page]
City Council 16 – 306 5/2/2023

Page 10 of 10 ends

RECOMMENDED FOR APPROVAL:

Nabil Saba
Executive Director
Public Works Agency
City Council 16 – 307 5/2/2023

EXHIBIT A
City Council 16 – 308 5/2/2023
City of Santa Ana RFP 19-090
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

PROFESSIONAL LAND SURVEYING SERVICES
RFP NO.: 19-090
Introduction and Background:

The City of Santa Ana intends to retain Professional Land Surveyors, licensed in the State of California, to perform land surveying services on an as-needed or “on-call” basis, or project basis for Capital Improvement Program (CIP) projects, and/or for projects under construction. Specific services shall be on-call and shall include all duties typically expected of a Professional Land Surveyor or surveying firm.

A Professional Services Agreement will be entered into with several of the qualified firms/consultant(s) to provide Professional Land Surveying services for a variety of projects on an on-call basis. On an on-call, as-needed basis, the selected firm(s) may be asked to provide professional services on specific, project-by-project basis, based on an agreed-upon specific scope of services and fees.

In general, work consists of general Land Professional Surveying services for Public Works Projects and or related to City facilities. The funding sources for each project may vary for each project/task order assignment shall comply with the funding agency’s requirements. The consultant shall be able to assist the City through this contract to provide the necessary services.

The consultant shall utilize in-house staff and/or sub-consultants to complete the assignments to meet the City standards. For specialized work for which the prime consultant shall require a sub-consultant, the prime consultant shall serve as an administrative liaison between the City and the sub-consultant.

Prime consultant mark-ups for sub-consultant work will not be allowed.

All proposals, plans, drawings, specifications, estimates, grant applications, and/or studies will be subject to the final approval and satisfaction of the City of Santa Ana.

Scope of Services
On as needed basis, the selected firm/s shall provide the City with the following services as described herein. A California-licensed land surveyor shall be in responsible charge of all survey work performed under this agreement.

City Council 16 – 309 5/2/2023
City of Santa Ana RFP 19-090
Page A1-2
The consulting firm/s selected for these services shall demonstrate the ability and experience in the following types or work and not limited to:

A. Prepare legal descriptions, plats and maps for subdividing property B. Research existing County and City records for survey monuments within the project area.

Prior to any clearing, removal, or excavation efforts, perform a diligent search for property line monuments, street centerline monuments, and benchmarks within the project area, recording their identities and precise locations in reference to monuments or witness monuments that will not be disturbed during construction. The records of these monuments and references shall conform to Section 8771 of the Business and Professions Code of the State of California. After completion of the construction, any monument disturbed or removed during construction shall be reset, conforming to Section 8771. Each centerline intersection shall be drawn on a single Corner Record showing local tie points and tie distances. A pdf copy of the final receded Corner Record shall be submitted to the City.

C. Perform boundary line adjustments
D. Perform monument perpetuation/preservation in areas that will be impacted by City projects
o Includes site investigation for existing monumentation, with a report provided to the City with recommendations.
o May include pre- and post-construction records
E. Replace lost or obliterated property corners
F. Set boundary markers or property corners, also known as monuments G. Retrace boundaries for fences and other purposes
H. Locate, relocate, establish, reestablish, or retrace, or retrace any property line or boundary of any parcel of land, right-of-way, easement, or alignment of those lines or boundaries I. Prepare legal descriptions and information shown with the description of any deed or other title document
J. Prepare Record of Surveys
Map Checking Services
A. Information furnished by the City for checking will be roughly as follows: 1 set of Exhibits, title reports, reference documents (Deed, Parcel Map, Tract Map, etc.), traverse closures, and improvement plans.

B. Prepare maps or plats
C. Review Exhibits for technical correctness and completeness, consistency with the City guidelines and requirements, compliance with the Subdivision Map Act, and acceptance for recording.

D. Review title report and existing easements for correct plotting and references.

E. Review improvement plans associated with the project to ensure the Exhibits correctly identify the limits and location as shown on the improvement plans.

F. Provide a set of redline check prints showing the redlined comments, and required City Council 16 – 310 5/2/2023
City of Santa Ana RFP 19-090
Page A1-3
corrections and information.

G. Provide a check letter covering the major required comments, and corrections and instruction for future submittals.

H. Provide a timesheet at the end of every review to include, but is not limited to, project name, review number, dates, review hours, hourly rate, and total cost.

I. Review maps and/or surveys such as Parcel Maps, Final Maps, or Tentative Maps Construction Services
A. Stake the location of fixed engineering works for construction purposes. Provide construction staking for project improvements. Records of the line and grade stakes (cut sheets) shall be on forms provided by the City, and the originals shall become the property of the City upon completion of each survey request. The City will provide digital construction plans and specifications for each project.

B. Set line and grade stakes in accordance with the plans and specifications. Notify the City immediately of any discrepancies or design errors discovered on the plans during staking or when verifying the line and grade of existing improvements at join points.

C. Complete the construction staking within the time frame as specified on the Survey Request Form, or (given minimum notice) commence the staking no longer than two working days from receipt of the request, providing continuous service until the request is complete.

D. Furnish all office support, labor, materials, equipment, tools and incidentals necessary to complete the specified surveys. The costs for these items shall be included in the hourly or lump sum costs and no additional compensation will be allowed therefor.

Miscellaneous Services
A. Investigate boundary discrepancies
B. Locate, relocate, establish, reestablish, or retrace the alignment or elevation for any of the fixed works embraced within the practice of civil engineering C. Determine contours of the earth’s surface for topographic maps D. Photogrammetric surveying or aerial topographic mapping or aerial photography E. Provide Professional Land Surveying services as requested. A detailed scope of work will be outlined when specific project is assigned to the consultant. Services shall include, but are not limited to, cross-sections, intersection grids, centerline determination, digital terrain models (dtm), right of way determination, utility profiles and exhibits.

F. Generate a computer drawing in Microstation V8 format as well as the sample survey City Council 16 – 311 5/2/2023
City of Santa Ana RFP 19-090
Page A1-4
drawing on the City of Santa Ana website listed in item K below.

G. All survey needs to be prepared to the satisfaction of the City’s Surveyor and meet the following standards:

H. Horizontal control shall be based on the 1983 North American Datum (NAD83), tied to a minimum of two proximate County of Orange, CCS83, Zone VI, 1991.35 Epoch Adjustment control points. Project coordinate values shall be provided in U.S. Survey Feet. The County control points shall determine the Basis of Bearing for the project.

I. Vertical control shall be based on the North American Vertical Datum of 1988 (NAVD88), tied to a minimum of two proximate County of Orange bench marks. Project elevations shall be provided in U.S. Survey Feet.

J. Horizontal alignment(s) for the project shall be tied to the survey centerline monuments within the project area.

K. With the coordinate values, a full location and detailed description, including point character with reference(s), shall be provided for all found and set monuments for the project. For this purpose, a sketch of the control network is required.

L. Copies of all survey field notes and raw data files shall be provided along with a listing of the final coordinates for all surveyed points. The digital file format for the listing shall be: point number, northing, easting, elevation, description (comma delineated with no spaces, one point per line). The coordinate precision shall be one hundredth of a foot.

M. At any given time the City may need to mobilize survey crews to different project sites, the consultant shall have a minimum of three (3) survey crews for mobilization.

N. All City CADD standards as well as Microstation configuration files are located at:
http://www.santa-ana.org/pwa/EngineeringServices.asp
Other Terms and Conditions:

1. The project will be implemented in compliance with the City of Santa Ana’s policies, as well as Prevailing Wages and State/Federal Requirements.

2. The City regards the inclusion of California based designs, engineering, and construction professionals, facilities, and services as part of the Team to be highly desirable, but not mandatory.

3. The City reserves the right to amend this Request for Proposal by addendum prior to the final dates of submission.

4. All reports, proposals, or other data or materials which are submitted shall become the sole property of the City of Santa Ana with the exception of the confidential Financial Capacity information and sealed fee proposals which will be returned to all proposers after award of City Council 16 – 312 5/2/2023
City of Santa Ana RFP 19-090
Page A1-5
contract to the selected Team.

5. All products used or developed in the execution of any contract resulting from this request will remain in the public domain at the completion of this project.

6. The City has an affirmative action program. The purpose of the affirmative action program is to encourage certified minority business enterprises and women business enterprises. All submitting firms must have established affirmative action programs approvable by the City.

During the RFP stage, all firms will need to complete a “Certification of Non-Discrimination by Contractors” for each firm on their team.

Special Requirements (Attachment 4)
This project may utilize California Department of Transportation (Caltrans) funds and shall therefore comply with all state and federal requirements. The below referenced forms included in Attachment 4 (Additional Provisions) of the Appendix must be completed in their entirety and submitted with your proposal:
 LAPM Exhibit 10-H: Sample Cost Proposal
 LAPM Exhibit 10-O1: Consultant Proposal DBE Commitment  LAPM Exhibit 10-O2: Consultant Contract DBE Commitment  LAPM Exhibit 10-K: Consultant Certification of Contract Costs and Financial management System
Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:
https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/ch10.pdf COMPLIANCE WITH REQUIREMENTS OF FUNDING AGENCY:

This agreement may be funded with state and/or federal grant funds administered by Caltrans.

Proposer shall comply with all requirements as they pertain to the use of these funds. Refer to Attachment 4 for Caltrans required forms, including Exhibit 10-H – Sample Cost Proposal (H2 for On-Call Contracts) in the Appendix of this RFP.

DISADVANTAGED BUSINESS ENTERPRISES (DBE) GOAL:

The Agency has established a DBE goal for this Contract. Proposers are encouraged to obtain DBE participation for this contract. Refer to Exhibit 10-I – Notice to Proposers DBE Information included in the Appendix of this RFP. Proposers must submit Exhibits 10-O1 & 10-O2 – Consultant Proposal & Contract DBE Commitment to demonstrate compliance with Agency’s DBE goal.

CONSULTANT AUDIT AND REVIEW PROCESS:

Prior to contract award and dependent on contract award amount, the selected Consultant shall be subject to an audit or review by Caltrans’ Audit and Investigations (A&I), other state audit organizations, or the federal government. The selected Consultant shall complete Exhibit 10-K – Consultant Annual Certification of Indirect Costs and Financial Management System for all prime and sub-consultants in the Appendix of this RFP.

To independently download any of the Caltrans Exhibits required per this RFP, visit:
https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms City Council 16 – 313 5/2/2023

EXHIBIT B
City Council 16 – 314 5/2/2023

PROPOSAL TO PROVIDE
On-call Professional Land Surveying Services
RFP No. 19-090
SUBMITTED ON OCTOBER 24, 2019
PREPARED BY TOWILL, INC.

City Council 16 – 315 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
October 24, 2019
City of Santa Ana
Attn: Mr. Sean Thomas, PE
Public Works Agency; M-36
20 Civic Center Plaza; 3rd Floor Reception, Ross Annex
Santa Ana, CA 92701
RE: Request for Proposal No. 19-090
Professional Land Surveying Services
Dear Mr. Thomas:

Towill, Inc. (Towill) is pleased to present our team’s qualifications and proposal to provide as needed surveying support to the City of Santa Ana (City) in response to your Request for Proposal (RFP). Since 1955, Towill has provided highly specialized geomatics services to clients throughout California. We are proud of the work we have accomplished and the relationships we have built along the way, and we are eager to establish a strong working relationship with the City.

Who We Are
Towill is a surveying and mapping firm; this is our sole focus and has been for the past 64 years. This is what we do, all we do, and we do it all in-house. We are not a division of a larger engineering company where priorities and resources can shift. We do not have an internal client base (other engineers) that can provide us with work when projects slow down. Since our clients can choose who they hire, we must strive for excellence in all we do.

As a professional services firm and as individuals, our number one goal is to provide our clients with on time, first time right project deliverables. Since we are solely focused on geomatics services, we attract and retain a core group of passionate staff and focus our investments on new survey equipment and the latest software.

Towill’s key personnel who will be assigned to this contract have on average 27 years of professional experience in field surveying, photogrammetric mapping, remote sensing, and GIS.

We take pride in designing cost-efficient technical approaches that continually meet or exceed our clients’ requirements for every project assignment. Our goal is never to just complete a survey/mapping design task, but to provide valuable geospatial information that will be used by engineers and others to improve the places we work and live. Whether it is for a small boundary survey or a large topographic base map, we understand that we are an important and valuable part of the overall project.

Expert Project Management
Towill has assembled a versatile team with exceptional technical experience and professional qualifications, and a commitment to responsiveness to meet your objectives. Leading the team as Project Manager will be James Rios, PLS. James is a Professional Land Surveyor with 21 years of experience as a Project Manager, Project Surveyor, and Party Chief. James has well-rounded experience with a heavy focus on projects for Southern California public sector clients, including but not limited to the Cities of Irvine, Yucaipa, Chino, local transportation agencies such as OCTA, RCTC, SBCTA, and the Port of Long Beach. Many of James’ project assignments have been completed according to Caltrans specifications with MicroStation V8 deliverables.

Cover Letter
City Council
1 16 – 316 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Towill has enhanced our team with the addition of DBE/SBE firm Chaudhary & Associates, Inc. (Chaudhary) as a subconsultant to provide added field survey capacity. Located in Long Beach, Chaudhary has been providing quality construction surveying, design, and right of way services in Southern California for the past 43 years.

Towill has an excellent working relationship with Chaudhary and has utilized their expertise on several projects throughout Southern California and the entire State of California.

Required Information
I, Marvin E. Miller, will have contractual responsibility with the City of Santa Ana during the period of proposal evaluation and my contact information follows at the end of this Cover Letter. Towill will serve as the Prime Consultant for the City of Santa Ana and Chaudhary will work as a DBE subconsultant to Towill. I am authorized to make legally binding commitments for Towill.

Contract Agreement Statement
Towill agrees to any and all provisions as contained in the Agreement in the RFP.

In closing, I am pleased to present you with a uniquely qualified team that has the support, when and if needed, of Towill’s entire corporate resources. I trust that the following proposal is sufficient in detail for your evaluation. However, should you have any questions or require additional information, please do not hesitate to contact me by phone at (949) 261-1900 or via email at [email protected]. Thank you in advance for your consideration of Towill, Inc. We look forward to the opportunity to be of service to the City of Santa Ana on this contract.

Sincerely,
TOWILL, INC.

Marvin E. Miller, MBA, RPP, PLS, CP, PPS, SP
Regional Director
Contractual Responsibility
Name: Marvin E. Miller
Title: Regional Director
Address: Towill, Inc.
500 S. Main Street, Suite 540
Orange, CA 92868-4507
Email: [email protected]
Phone: 949.261.1900 ext. 1504
Project Management
Name: James Rios
Title: Project Manager
Address: Towill, Inc.
500 S. Main Street, Suite 540
Orange, CA 92868-4507
Email: [email protected]
Phone: 949.261.1900 ext. 1704
Points of Contact
City Council
2 16 – 317 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Firm and Team Experience
Firm Profile
Towill, Inc. (Towill) is an experienced provider of surveying and geomatics services offering a broad range of advanced surveying, mapping, and geospatial
solutions, which include land surveying; high accuracy specialty surveying; digital aerial photography; airborne, terrestrial, and mobile Light Detection and
Ranging (LiDAR); digital 3D and 2D photogrammetric
mapping; volumetrics; and geographic information
systems (GIS).

Since the firm’s establishment in 1955, the field of
surveying and mapping has been Towill’s sole focus.

We have become one of the most accomplished
providers of geospatial solutions in the western United States. Towill has invested over $6 million in modern
hardware and software to ensure that we can provide
our clients with the most accurate, cost-efficient, and timely services available.

This commitment to innovation, combined with our
dedicated, passionate staff, are the keys to Towill’s
success, which is demonstrated by our high rate of
repeat clients and referrals. Over 85% of Towill’s business comes from repeat clients, which is a testament to our client focus, culture of client service, and overall ability to deliver on time, first time right services.

Extent of Experience
Over the last 64 years, Towill has completed more
than 16,000 projects across a wide range of industries in support of engineering design, transportation, rail, tunneling, major planning, GIS, construction, and floodplain projects. Our projects range from large to
small and from multi-million-dollar, multi-year on-call contracts with agencies such as the U.S. Army Corps
of Engineers (USACE) and the State of California
Departments of Transportation (Caltrans) and Water
Resources (DWR), to smaller projects completed in
as little as one day. We provide our clients with a single source for all their surveying, mapping, and GIS needs.

Towill has worked with dozens of public agencies,
from local to federal, throughout our history; we
understand your priorities and the unique challenges
that cities face. Our previous experience on dozens of
as needed or on call surveying and mapping contracts
for various public-sector clients provides us with working knowledge of local agency systems, procedures, and expectations. We excel at managing multiple projects simultaneously because we know that our clients depend heavily on the deliverables that we produce to
perform their planning, design, and construction tasks.

Towill has the staff, experience, and resources needed to complete your tasks on time and on budget.

Within the past ten years, Towill has successfully held on-call survey and mapping contracts with a wide variety of public sector clients of all sizes, including the cities of Chino, Huntington Beach, Irvine, Long Beach,
Moreno Valley, Pomona, Pasadena, San Diego, and
Vista, and the counties of Los Angeles, Orange, Riverside, and San Bernardino.

This extensive previous experience is proof that we
understand our primary role as a consultant: to provide a pool of resources—personnel and equipment— that our clients can call upon to fulfill surveying and mapping requirements as necessary.

Our DBE Commitment
Towill is proud of our firm’s commitment to the affirmative action (including SLBE/ELBE/DBE/MBE/ WBE/DVBE/OBE) programs and being an equal
opportunity employer. We have successfully mentored
small and disadvantaged businesses through the
Caltrans’ Calmentor Program. This statewide California program is designed to encourage and support small businesses through voluntary partnerships with
established firms. Caltrans provides training, facilitates the relationships, and provides opportunities to network with additional consultants. Goals are set in
a Memorandum of Understanding; and upon documentation and goal achievement by both the Mentor and Protégé firms, the firms are graduated. Towill has
graduated multiple small firms from this program.

In addition to the individuals Towill offers in-house, we have joined with a long-term partner on this contract:

Chaudhary & Associates (DBE, Micro/SBE, MBE) to
provide field survey support. We are eager to share
the work assigned from this contract with Chaudhary
because they are composed of individuals we know
personally, trust completely, and with whom we have
City Council
3 16 – 318 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
a history of providing successful projects together. We will achieve 10% utilization with Chaudhary, far exceeding the City’s established DBE goal of 0.5%.

Key Personnel
Towill is pleased to introduce the team of key personnel we have chosen specifically for this contract. Our assigned key personnel will be available to the extent
proposed for the duration of the required services.

Towill acknowledges that no person designated as
“key” shall be removed or replaced without prior written concurrence of the City of Santa Ana.

At any given time of the year, Towill’s active backlog
represents ~45% of our monthly capacity. Accordingly,
we have more than enough capacity to support the
anticipated requirements of this program.

An organizational chart is included at the end of this
section. Complete resumes for the following key individuals are located in Appendix A.

Survey Project Manager:

James Rios, PLS
James has 22 years of experience in
land surveying as a Project Manager,
Project Surveyor, Party Chief, and
Mapping Manager. James has well
rounded experience with a heavy
focus on projects for Southern California public sector clients, including Orange County Public Works, the
Cities of Moreno Valley and Yucaipa,
the Port of Long Beach, and many
others. His extensive experience includes performing
field calculations, right-of-way and boundary surveys,
and mapping.

James regularly coordinates and oversees efforts in
all aspects of land surveying, including research and
analysis, title reports, rights-of-way, easements, American Land Title Association (ALTA) surveys, topography, boundaries and mapping, construction staking, and the preparation and filing of subdivision maps,
Corner Records, and Records of Survey.

As Project Manager, James will be responsible for
daily oversight of field survey crews and office survey staff, including progress tracking and reporting to the Principal-in-Charge. In addition, he performs research
activities; prepares metadata and technical reports
in accordance with contractual requirements; implements QA/QC processes for all field and office surveying tasks; and verifies that the content and accuracy of deliverables adhere to project specifications.

Principal-in-Charge:

Marvin E. Miller, MBA, RPP, PLS,

CP, PPS, SP
Marvin is an accomplished geomatics professional with 43 years of project/operations management, project design/implementation, and business
leadership/consulting experience
within the private sector disciplines
of surveying, remote sensing, photogrammetry, enterprise GIS, and related geomatics services. During
his career, Marvin has served as Principal in Charge,
Project Manager, Technical Compliance Manager, and
Surveyor of Record for numerous federal, state, and
local agency project undertakings.

As Principal-in-Charge, Marvin will be responsible for
contract administration, including preparation of cost
estimates, proposals, technical and administrative reports, and invoices. Additional responsibilities include monitoring budgets and schedules for compliance and
acting as necessary to keep them within contractual
parameters. He will perform oversight of all project
group members and their functions and Independent
Technical Review (ITR) of technical procedures, QA/
QC procedures, and results (i.e., deliverables).

Marvin will serve as James Rios’ back-up when he
is unavailable.

QA/QC Lead
Frank Borges, PLS
Frank Borges is a Professional Land
Surveyor and an Associate Principal
at Towill with 23 years of experience.

He has performed and supervised
projects involving boundary surveys, legal descriptions and plats, topographic base maps, geodetic
survey control, aerial mapping, ALTA
surveys, monitoring surveys, construction staking, aeronautical surveys, hydrographic surveying, and LiDAR scanning for clients both private
City Council
4 16 – 319 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
and public. His success on projects comes from his
attention to detail in clearly established production
procedures, QA/QC, and accountability for tasks
completed.

As QA/QC Lead, Frank will be responsible for assuring the professional quality, technical accuracy, completeness, and consistency of all Towill’s deliverables under this contract.

Licensed Party Chief / Field Survey Lead:

Nicholas Lewis, PLS
Nick is a California Professional Land
Surveyor and Certified Party Chief
with the International Union of Operating Engineers Local 12. He brings 37 years of field survey experience
to the Towill team and has worked
on projects for the Cities of Fullerton,
Irvine, and Huntington Beach. His
land surveying experience includes
roadway design and construction,
horizontal and vertical control, topographic surveys,
boundary surveys, GPS, monitoring, and 3D laser
scanning.

As Field Survey Lead, Nick will be responsible for developing work approaches and cost estimates, scheduling and managing field crews, directing field and office staff, and providing quality assurance/ quality
control and supplemental work and safety planning.

Nick is capable of performing production work when
needed and management of specific project tasks.

He also performs job site inspections for safety and
planning of work tasks and may be responsible for
communication with City staff and the general public
at the project site as needs dictate.

Associate Surveyor / Office Survey Lead:

Christopher Johnson, LSIT
Chris is an Office Surveyor/Certified
Party Chief with 33 years of experience in the surveying field. His background includes design surveys,
construction staking, corridor control
surveys, boundary surveys, ALTA
surveys, 3D laser scanning, right-ofway monumentation, and topographic surveys. He is knowledgeable in the use of MicroStation, InRoads,
TopoDOT, and Trimble survey instrumentation and
software, as well as Caltrans standards.

As Office Survey Lead, Chris will be responsible for
processing field data, performing GPS reductions and
network adjustments, reducing laser scanning datasets, analyzing laser scan data, and preparing internal deliverables to the project team for final CAD mapping
and deliverables.

Senior Geomatics Analyst / Aerial Survey Lead:

Lorraine Amenda, PLS, CP
Lorraine has 29 years of surveying
and mapping experience and has
served as a Senior Photogrammetrist
and Photogrammetry Project Manager for over fifteen years. She joined Towill after the completion of her
Surveying Engineering degree from
California State University, Fresno.

Her experience and knowledge include least-squares adjustments and advanced computations for surveying and photogrammetric processes, design of ground control networks, flight planning, and Light Detection and Ranging
(LiDAR) data processing.

As Aerial Survey Lead, Lorraine will be responsible for daily oversight of photogrammetry personnel (including those assigned to airborne LiDAR and GIS tasks) and tracking progress and preparing reports for the
Project Manager and Principal-in-Charge. She performs advanced technical functions, such as airborne GPS processing, analytical aerotriangulation computations, airborne LiDAR data processing, and volume calculations. In addition, she prepares metadata
and technical reports in accordance with contractual
requirements; implements QA/QC processes for all
photogrammetric, airborne LiDAR, and GIS tasks; and
verifies that the content and accuracy of deliverables
adhere to project specifications.

Geomatics Specialist / Airborne
LiDAR Lead:

Keith Kirkby, PE, P.Eng.

Keith’s 23 years of experience includes a diverse array of proficiency providing geomatics (geospatial)
services with an emphasis on airborne remote sensing applications.

City Council
5 16 – 320 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
He has designed, implemented, and managed dozens
of airborne LiDAR acquisition missions, geodetic and
photo control surveys, aerial photography campaigns,
and GPS field surveys for engineering design and GIS
base mapping applications.

As Airborne LiDAR Lead, Keith will be responsible
for the acquisition and interpretation of LiDAR data,
which includes development of work plans, coordination and scheduling of equipment and other resources, on-site data acquisition, which may include field surveying, post-mission data processing and reductions, interpretation and analysis, and reporting of LiDAR data utilizing a variety of techniques.

Associate Surveyor / Terrestrial LiDAR Lead:

Frederick “JR” Gregory, LSIT
JR has 14 years of surveying and
mapping experience in both the field
and office, which includes topographic mapping, plats/legal descriptions, LiDAR data extraction and classification, and right-of-way appraisal mapping. Over the past five years,
JR has focused extensively on the
design of static and mobile terrestrial
LiDAR (3D laser scanning) surveys
and the collection, processing, and classification of
LiDAR point cloud data. He is well versed in a variety of survey and mapping software applications and packages, including AutoCAD Civil 3D; Cardinal VR;
Carlson software; Bentley MicroStation, InRoads, and
TerraScan; TopoDOT; Trimble Business Center and
Trimble RealWorks; and STAR*NET.

As Terrestrial LiDAR Lead, JR will be responsible for
the design and execution of any required 3D laser
scanning tasks, as well as the processing and classification of the terrestrial LiDAR data collected.

Certified Party Chief:

Oliver Rocha, LSIT
Oliver is a Certified Party Chief with
29 years of land surveying experience. He has worked for several local public agencies, including
the Cities of Irvine, Moreno Valley,
Colton, and Yucaipa. He has been
involved in numerous survey projects
consisting of topographic, boundary,
construction, right-of-way, and GPS surveying on a
variety of projects, including highways, roadways,
site development, and communications. He will be
responsible for performing the necessary field surveys
to support task orders, including but not limited to,
topographic, boundary, and construction surveys.

As Certified Party Chief, Oliver will lead and coordinate field staff task assignments on a daily basis, according to project assignment under the direction of
the Field Survey Lead and Project Manager. He oversees crew set up and ensures that proper equipment and procedures are used, consistent with the scope of
work for the project. He also performs job site inspections for safety and planning of work tasks and may be responsible for communication with City staff and
the general public at the project site as needs dictate.

Subconsultant Party Chief:

Jose Casanova, LSIT, Chaudhary & Associates
Jose has more than 20 years of
extensive civil engineering and land
surveying experience in the private
sector. He is highly proficient in
MicroStation, InRoads, AutoCAD,
Civil 3D, Softdesk, and GPS Trimble
software. He has worked on a variety
of projects including land surveying,
architectural, transportation, water,
land development, and telecommunications, and is currently studying for his Land Surveying license. He has also spent time as
a Party Chief and Chainman in a field crew, providing
him with a complete understanding of project design.

Subconsultant Potholing Lead:

Salvador Silva, AirX Utility Surveyors
Salvador has nine years of experience at AirX working from the ground up as a laborer specializing in potholing, to crew chief, and now field crew supervisor.

As Potholing Lead, Salvador will be
responsible for scheduling potholing
crews and monitoring productivity
and safety during traffic control setup
and during pothole excavation.

City Council
6 16 – 321 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Organization Chart
City Council
7 16 – 322 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Project Understanding
Towill completely understands the required details regarding the possible variety of the City’s public works projects, including the technical requirements, scope
of work, schedule, project Area of Interest (AOI), and
the required deliverables associated with survey task
order. Moreover, Towill understands that the primary
on-call professional land survey services required by
the City of Santa Ana may include:

1. Research and Data Collection

2. Vertical & Horizontal Control Surveys

3. Prepare Legal Descriptions, Plats, and Maps

4. Monument Perpetuation/Preservation

5. Map Checking Services

6. Construction Staking Services

7. Photogrammetric/LiDAR Surveys

8. Topographic Surveys

9. Boundary and Right of Way Surveys
The overall Project Area of Interest (AOI) is approximately 27.5 square miles and includes the corporate boundaries of the City of Santa Ana. In addition, we
understand that one of the primary goals of the program is to provide the City’s Public Works Department with timely/precision professional surveying services
that are tailored to fit the objective of each project
assignment.

Because surveying, mapping, and GIS are the only
services we offer, on-call service contracts represent
a significant portion of Towill’s business model. In fact, across our firm, we currently manage over 50 different
on-call surveying/mapping contracts for public sector
clients and utility companies of all sizes.

It is important to note that we prioritize all of our on call contracts equally. New task orders are inserted
into our workflow as they arise and are completed
as delivery schedules dictate. We achieve very high
levels of client satisfaction by maintaining the critical internal communication necessary to keep on top of
task budgets and schedules, shift workloads across
office locations as needed to maximize efficiency, and
rapidly re assign available resources to meet project
commitments.

Details on the nine primary land surveying services
noted above can be found in the Scope of Services
and Schedule section of this proposal.

Proactive Task Order Management
Our approach for all the work that we do always starts
with communication. Before any work begins, our
project managers strive to learn about your expectations for each task order, your schedule and budget requirements, and any other potential issues. We then
develop a concise Scope of Work, cost estimate, and
schedule which, when accepted by the City, becomes
the basis for the work. No work will be performed until the City has authorized it via the issuance of a
Notice-to-Proceed (NTP).

Upon approval of the task order, the team will have
a kickoff meeting to focus on delivering a consistent,
Understanding of Need
City Council
8 16 – 323 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
efficient, and quality deliverable. Instructions to the project team will be developed and distributed to
all members. These instructions may include communication protocols, schedules/budgets, technical standards, health/safety requirements, scope of work,
required deliverables, quality control plans and procedures, and/or review of environmental policies.

Throughout the performance period, Towill’s project
manager will maintain open lines of communication
with City staff, attending regular status meetings and/ or reporting on the project’s progress via email correspondence or by phone. Once deliverables are submitted to the City, we respond to any questions or
comments you may have, make any final revisions
necessary, and ensure that your staff is completely
satisfied with all deliverables prior to close-out of the task order.

This process is summarized in the flowchart graphic
on the previous page. Towill’s project manager and
support team are committed to responsiveness to
meet your objectives. We know from experience that
our proven task order management process will be
key to successfully deliver your task orders on time
and within budget.

Suggestions or Special Concerns
Given the nature of the anticipated Capital Improvement Program (CIP) projects along with Towill’s 64 years of experience providing on-call land surveying,
we are pleased to have the opportunity to suggest
some value-added services for your consideration.

Terrestrial, Mobile, and Airborne LiDAR
Towill brings 15 years of terrestrial LiDAR scanning
ability. Terrestrial LiDAR scanning can be used to
obtain spatial information for features that require a
high level of detail or that are difficult to reach. It can also be used to gather many data points on complex
surfaces, such as rough and uneven ground. The key
to successful terrestrial LiDAR scanning technology
is knowing when it is the right tool for the job and how to combine and augment it with other measurement
methods and data products to provide the most efficient service for the tasks at hand. In addition, Towill’s unique business model, which combines complete aerial photogrammetric and LiDAR services, as well as ground-based field surveying augmented with LiDAR,
brings a comprehensive mapping tool set to the City.

Recently, Towill completed 16 miles of detailed topographic mapping along State Route 91 in Riverside County, utilizing a combination of mobile and terrestrial LiDAR, aerial photogrammetry, and conventional ground surveys. This seamless integration of various
advanced and conventional technologies allowed the
Towill team to complete this design-level mapping
project to Caltrans standards within 120 days. This is
a strength the Towill team will bring to the City.

Depending upon the project requirements, incorporating aerial LiDAR as part of the overall solution often represents a cost and time-saving approach. Our
airborne LiDAR systems are integrated with precision
Phase One 100-megapixel digital image sensors.

Combining traditional photogrammetric mapping
techniques with state-of-the-profession aerial LiDAR,
represents not only a cost-efficient project approach
but also the ability to provide precision map documents in areas that would compromise the safety of our field crews. We would also like to point out that we often fuse together terrestrial and aerial LiDAR data
sets. For projects where LiDAR represents a more
cost-efficient approach, the combination of stereo
imagery with aerial LiDAR traditional photogrammetry
techniques with state-of-the-profession LiDAR technologies.

Potholing
Towill’s land surveying experience in highly urbanized
areas often requires locating buried utilities. Accordingly, should the need arise for locating underground utilities, Towill will enlist the services of our subconsultant, AirX Utility Surveyors, Inc. AirX is a Woman Owned Small Business (WOSB) with offices in Rancho Cucamonga and Escondido, California, has
been providing Subservice Utility Engineering (SUE)
services since 2000. They are a trusted SUE services
provider to not only Towill but also to many local agencies throughout Southern California.

Assumptions and/or Exclusions
Access to all assigned project AOI’s will be made
available to the survey teams without restrictions or
added cost.

City Council
9 16 – 324 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Since Towill’s inception in 1955, we have served as a
consultant on hundreds of contracts for public agency
clients, from the federal and state level down to local agencies and special districts, with the majority of
our work generated from on-call contract task orders.

In fact, approximately 70% of Towill’s total revenue
earned last year came from municipal clients and their
projects. Following is a small sample of the projects
we have completed over the last five years.

Caltrans District 59: As-needed
Aerial Mapping Services Contract
Towill is currently under our fifth consecutive contract with Caltrans to provide as-needed professional aerial
photogrammetric mapping services statewide. Most
tasks under this contract are focused on the acquisition, processing, and classification of airborne LiDAR (Light Detection and Ranging) data and the generation of color orthophotography; an increasing number of projects over the last two contract periods have
also included the capture of planimetric features.

Specific services provided under these contracts
include airborne LiDAR data acquisition and processing, photogrammetric mapping, aerotriangulation, ground control surveys, and quality control surveys.

We completed a total of 56 task orders during our
previous on-call contract (2015-2018), including:
• State Route 74 in Orange County: Airborne LiDAR
mapping and orthophotography for approximately
five miles from west of Hot Spring Canyon Road
to the Riverside County border in southeast
Orange County. Year Completed: 2018;
• Interstate 15 in Riverside County: Airborne
LiDAR data collection for pavement condition
studies along a three-mile stretch of highway near
Temecula. Year Completed: 2017; and
• Interstate 40 in San Bernardino County: Airborne
LiDAR, Mapping, and Orthophotography for a
50-mile stretch between Ludlow and Needles.

Year Completed: 2016.

Orange County Transportation
Authority: OC Streetcar Project
Construction Management Services
Towill is providing on-call construction staking services to PGH Wong for the OC Streetcar project. This OCTA project is in coordination with the City of Santa
Ana and City of Garden Grove to construct a new
east-west double-track modern streetcar in Orange
County between the Santa Ana Regional Transportation Center in the City of Santa Ana and the Harbor Boulevard/Westminster Avenue intersection in the
City of Garden Grove. The purpose of the project is to
improve transit connectivity and transit accessibility, increase transit options, relieve congestion by providing alternative mobility options in a manner that is sensitive to the community’s character, and provide
benefits to the environment through improved air quality. Year Completed: Ongoing.

City of Irvine: Culver Drive and
University Drive Intersection
Improvements Project
Towill is providing construction surveying services to
support the Culver Drive/University Drive Intersection
Improvements project. The project involves widening
the roadway; reconstructing the concrete median,
sidewalks, curb and gutter, etc.; street light relocation; traffic signal modification; extension of an existing
channel box culvert; installation of a landscape and
irrigation system; signing, striping, and pavement
markings; and relocation and adjustment of IRWD
water facilities. Towill’s tasks include performing a
centerline survey and monumentation recovery; detailed surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model and street cross-sections; performing construction staking
and as-built surveys; and monument preservation.

Year Completed: Ongoing.

Relevant Project Experience
Client: Caltrans District 59
Contact: John Erickson, CP, PLS
Phone: 916.227.7649
Owner: OCTA
Client: PGH Wong Engineering, Inc.

Contact: Doaa Aboul-Hosn, PE
Phone: 602.300.4091
City Council
10 16 – 325 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
City of Irvine: Alton Parkway
Pavement Rehabilitation Project
Towill performed horizontal and vertical control surveys, topographic surveys and centerline surveys for a 3,000-foot portion of Alton Parkway near the Irvine
Spectrum. Utilizing a combination of conventional
survey methods and 3D laser scanners, Towill collected full street topographic data without impeding traffic or closing a lane. The final data was mapped, a digital terrain model created, and all delivered to the design
team in MicroStation and InRoads format.

Year Completed: 2017.

City of Fullerton: Raymond Avenue
Grade Separation Project
Towill provided quality assurance construction surveying services, including verifying the primary and project control, reviewing the horizontal design alignments and vertical profiles, and responding to construction
survey requests, to support this grade separation
project. We monitored the contractor’s surveyor for
compliance with the project surveying requirements,
verified their layout and controls, spot checked reference points and finished work, and monitored for settlement or movement of existing facilities. Construction surveys were performed in accordance with the Caltrans Survey Manual and its revisions. Year
Completed: Ongoing.

Los Angeles County Department of
Public Works: As-Needed Surveying
and Mapping Services Contract
Towill has been providing land surveying and mapping
services for the Los Angeles County Department of
Public Works since 2013. Our two most recent task
orders are described below.
• LACDPW Headquarters Building ALTA/NSPS
Land Title Survey: Towill completed an ALTA/
NSPS Land Title Survey for the Department of
Public Works Headquarters building. Services
included establishing ground control, color aerial
photography, planimetric feature collection at
1” = 20’, and development of Digital Terrain
Model (DTM) sufficient in detail for generating 1.0’
design contours. Our subconsultant, AirX, used
Ground Penetrating Radar (GPR) to locate the
underground utilities. Year Completed: 2019.
• Roosevelt Park Construction Staking: Towill is
currently supporting the County’s contractor with
construction staking services for the subject
project. To date, there have been a total of 32
staking requests issued, all of which have been
completed within forty-eight hours after receipt.

Year Completed: Ongoing.

Orange County Public Works: On-call
Surveying Services Contract
Towill has been providing on-call surveying services
to the Surveyor’s Office of the Orange County Public Works Department since 2010. Services that can be requested under this contract include boundary
surveys, monumentation, monument preservation,
topographic surveys, construction surveys, and other
land surveying tasks. Our current contract extends
from 2018 through 2021.

Under our previous contract, Towill completed 11
surveying task orders, including several that involved
deformation monitoring and monument preservation
and perpetuation. Deformation monitoring was provided for the Peters Canyon, Villa Park, and Sulphur Creek Dams. The monitoring surveys included horizontal and vertical control, horizontal monitoring of specific points along the dams utilizing GPS static
survey procedures, and vertical monitoring of specific
Client: City of Irvine
Contact: Uyenly Bui
Phone: 949.724.7559
Owner: City of Fullerton
Client: Berg & Associates, Inc.

Contact: Carlos J. Quiroz, QSP
Phone: 310.548.9292
Client: LACDPW
Contact: Mark Wittig, PLS
Phone: 626.458.5144
City Council
11 16 – 326 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
points along the dams utilizing precise leveling
procedures.

Towill also provided monument preservation and
perpetuation services for more than 150 monuments
in the unincorporated areas of Cowan Heights, Lemon
Heights, and Panorama Heights in Orange County to
support planned overlay construction activities. Year
Completed for all of these task orders: Between
2015 and 2018.

References
City of Irvine
Uyenly Bui
Email: [email protected]
Phone:949.724.7559
Projects:
• Culver Drive and University Drive Intersection
Improvements
• Alton Parkway Pavement Rehabilitation
Orange County Public Works
Wade Weaver
Email: [email protected]
Phone: 714.955.0151
Projects:
• Olive Heights Monument Preservation
• Various deformation monitoring task orders
County of Los Angeles
Mark Wittig, PLS
Email: [email protected]
Phone:626.458.5144
Projects:
• LACDPW HQ ALTA/NSPS Land Title Survey
• Roosevelt Park Construction Staking
Client: OCPW
Contact: Wade Weaver
Phone: 714.955.0151
City Council
12 16 – 327 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Scope of Services and Schedule
Scope of Work
Research and Data Collection
Towill routinely conducts a variety of project-related
research, such as title reports, APN/property ownership review, zoning, benchmarks, boundary control, and FEMA documents, to name a few. Through decades of experience, we know which agencies to
contact for each specific type of document, what the
processes and lead times are for obtaining them, and
what potential challenges to expect. Research may be
performed at city or county offices, utility agencies, or other appropriate sources.

Vertical and Horizontal Control
Horizontal and vertical control is the backbone of any
successful survey project. The placement of control
point locations is carefully evaluated to determine the most efficient method of performing the project tasks.

Existing maps and photography, city and county
maps, and available historic maps are studied to determine how to refine control point locations to better serve each project and make the working conditions
safe for the field staff. Whenever possible, the control points are located on or near roads, trails, levees, or other common routes of transportation. Special efforts
are taken to obtain appropriate permission to access
private and/or government properties.

Towill is experienced in conducting conventional
surveys, monitoring surveys, precise digital geodetic
leveling, and GPS static surveys, as well as establishing local project control. We have set up thousands of control networks and are well-versed in tying into and/ or expanding existing control networks. Our staff have
decades of experience with a wide variety of coordinate systems and the expertise to know which ones apply to each project.

We regularly perform static, rapid-static, kinematic
and real-time kinematic (RTK), and real-time network
(RTN) GPS surveys to establish ground control, depending on the requirements for the project. We own and use Trimble dual-frequency GPS receivers. Static
and fast static sessions are used to establish primary
control stations; fast-static and kinematic sessions
are used for secondary control. The Towill Team is
well-versed in utilizing GPS methods for establishing
vertical control and deformation monitoring to various
standards, including the National Geodetic Surveys.

Moreover, Towill has extensive experience in the
performance of geodetic surveys and is very familiar
with working in the most current national datums;
e.g., the North American Datum of 1983 (NAD83),
2011 (2010), and the North American Vertical Datum
of 1988 (NAVD88). We also have a world-renowned
geodetic expert on staff to lead any specialty or high
accuracy survey efforts, if needed. Towill’s team of
professional licensed surveyors are keenly aware and
always up to date with technical issues relating to
the evolution of geodetic datums, geodetic surveying
technologies, and associated standards and procedures.

Legal Descriptions, Plats, and Maps
Towill has extensive experience and expertise in
boundary and property surveys for land and parcel
determination, performing tens of thousands of surveys over our 63-year history. The initial step to any successful boundary survey is performing the proper
research of land records. Public records research is
required to identify primary control, right-of-way information, and boundary lines, or lines of occupation, before performing the work. Research may be performed at city or county offices, utility agencies, title companies, or other appropriate sources. Necessary
records are identified, organized, and analyzed for the field and office tasks.

Once the research is complete and all documentation
associated with a boundary has been analyzed, we
can prepare highly accurate calculations of where we
can expect to locate monumentation associated with
the boundary determination. Throughout the course of
the field survey (which utilize both GPS and conventional survey techniques), adjustments can be made to further enhance the accuracy of the search locations and minimize the amount of field time required to complete the survey. When survey results are
returned from the field, they are compared to record
deeds and maps and the boundary analysis is performed. With years of experience, we can efficiently and accurately complete the boundary process, comCity Council 13 16 – 328 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
piling an accurate and defendable survey.

Towill’s team of surveyors has the experience and
knowledge to tackle any and all boundary surveys,
from public land surveys to subdivision retracements
and establishment of centerlines. Towill consistently remains informed of changes in local, state, and federal laws pertaining to surveying and is very active in continuing education to ensure we remain current.

When locations are returned from the field, they are
compared to record deeds and maps, and the boundary analysis is performed. With our years of experience, we can efficiently and accurately complete the boundary process, compiling an accurate and defendable survey.

According to the California Professional Land Surveyors’ Act, a Corner Record may be used to perpetuate, rehabilitate, or reestablish monumentation that has
existed in the past in other circumstances; and, when
more extensive work is required, or several monuments in the same area are in question, it may be necessary to file a Record of Survey map. Records of
Survey will clearly identify project horizontal control, record map information, and additional data, and lines
and calls prepared in the initial boundary surveys
phase. Once a map is ready, our project manager
will submit the document to the City for review and to
Orange County for map checking. Any comments will
be addressed, and the document will then be filed at
the County Recorder’s Office for recordation.

These mapping items will be prepared in accordance
with the California Subdivision Map Act, California
Professional Land Surveyor’s Act, California Public
Resource Code, and the City of Santa Ana Municipal
Code. These items will be discussed with the City
and/or County agency where the property is situated.

The anticipated deliverables for this item will vary
depending on the requested subdivision mapping task
requested.

Map Checking Services
Towill’s team of professional surveyors are well qualified to perform map checking services for the City.

In fact, the greatest testament to our expert working
knowledge is that we are currently performing the
exact same map checking as those noted in the
City’s RFP for the City of Fremont as well as Alameda
and San Mateo Counties. We also served as a map
checking subconsultant to MSN Engineering for their
on-call contract with the City of Pasadena. Our experience includes but is not limited to the preparation and review of parcel maps, tentative maps, subdivision
maps, records of survey, and annexation maps.

When preparing maps to support the division of land,
knowledge of the Subdivision Map Act (SMA) is critical. Subdivision and other related maps begin as any other boundary survey would, with research, field surveys, and boundary line determinations. Understanding the intent of the map guides the next step, where new lines may need to be determined for parcel splits
or site features may be located to support a lot line
adjustment or encumbrance map.

Construction Staking
Construction staking assignments begin with our
checking and verifying project horizontal and vertical
control prior to the commencement of construction
layout work. Our crews will independently survey this
control, and we will provide a project control report
for use by the construction staking surveyor. When
ground surveys, such as field quantity verification,
subsidence, layout verification, or utility relocation
surveys, are needed, all resulting data is smoothly
integrated into final as-built or as-verified reports.

A review of the construction plans is completed to
determine if sufficient information has been provided for us to perform construction staking from the plans; we also vigilantly check for errors or omissions.

Missing information is tabulated and presented to the
City for their review. When we see things that do not
look right, our first step, upon review by the Project
Manager, is always to alert the City. While we are not
engineers, our experience with working from their
plans has afforded us the insight to know when things
do not appear to be in order and may need a second
look.

We regularly perform surveys to support the construction of a wide range of projects for both public and private entities. Typically, the staking plan will be laid out in AutoCAD or other software if specified by the
client. The project manager conducts a site reconnaissance, coordinates with the client, and finalizes the field crew’s action plan.

Construction line and grade layout, whether it is
City Council
14 16 – 329 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
for roads, sewer, water, storm drain, or grading,
will require a swift response to avoid costly delays
in construction. Towill often works in a survey construction management capacity and has developed profession-leading, efficient methods for work performance. Field crews are equipped with pre calculated horizontal and vertical alignments so that offsets can
be determined at the time of staking and so that cuts
and fills can be compared to design data at the point
of collection. Many of Towill’s survey crews are headed up by experienced LSITs with the ability to perform field calculations, field inspections, and problem-solving when the need arises. All verification data is transferred to Towill’s database for secondary accuracy checks by office personnel.

Limits of removal are staked based on approved plans
and/or visual inspection in the field. Our crews have
enough experience at this exercise to realize when
things appear to be either insufficient or excessive. If it is believed that the removal limits either exceed or are inadequate for construction, we will advise City
staff. The limits can be staked either at the actual
location, such as paint on curb, or on an offset that
can be used later for construction, thereby saving time and money.

Examples of QA/QC steps for construction layout
are calculating points from different starting points,
comparing station and offset listings with plan sets,
and graphic checks for irregularities. In the field,
comparisons are made to existing structures, and the
relationship of reference points are verified visually
as they are set. As-staked shots are taken on points
set to compare coordinates to the original calculated
positions. Different personnel are called to examine
items throughout the process to provide an independent check.

Monument Preservation
In keeping with Section 8771 of the California Business and Professions Code, Towill recognizes how critically important accurate and enduring survey monumentation and control is to the survey operations of both the City and the surveying community. Without
the perpetuation of controlling monuments, countless
additional hours of field and office work can occur for both public- and private-sector projects.

Every project we undertake begins with a thorough
review of not only record information but also of the
proposed construction in the area. Our project manager organizes the investigation into existing recorded documentation with the City of Santa Ana, Orange
County, and other agencies. Records research is typically performed by the project manager or under his direction. From this research, a plan of action is developed for the preservation of existing monumentation and the setting of new points.

Our first step in preserving the monumentation is to
determine by field verification what monuments are
still in place, which have been buried, and which have
been destroyed. We then advise the City of our findings and plan an operation of setting tie points, which, based on our review of the construction documents,
will be established outside proposed construction
activities.

Monumentation will be marked with either furnished
(or as otherwise specified) disks, plugs, or tags, which shall be stamped with the project manager’s California
Professional Land Surveyor registration number, or as
directed in each task. Monumentation shall be established or preserved for the project or project areas, and shall include considerations for utility locations, proper spacing, and durability. All monuments will be
field referenced with a minimum of four (4) intersecting reference points, such as cut crosses on curbs, rebars outside the work area, or other approved reference points.

A pre-construction Corner Record will then be prepared and recorded with the County of San Bernardino for each monument. Corner Records shall include the character of the monument, its record reference,
reference ties, and other pertinent data. All such field monumentation work will conform to Section 8771 of
the California Business and Professions Code, which
addresses the preservation of existing survey monuments.

When construction has been completed, we return
to the area and determine which monuments and/
or tie points will need replacement. In many instances, damage to the existing monuments is limited. In cases where monuments are to be replaced, a durable monument, as described above, or standard well monument, if required by the City, is established and
post-construction Corner Records are filed. All docCity Council 15 16 – 330 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
umentation and Corner Records will be prepared to
meet the requirements of both the City of Santa Ana
and the County of Orange.

Topographic Surveys
Towill’s primary business is land surveying and mapping. Along with our extensive field and office survey staff, we also have an in-house photogrammetry
group of professionals that enables us to perform
mapping tasks using either ground- or aerial-based
surveying methods, or a combination of the two.

This allows us to most efficiently address the client’s needs. Because our internal staff work together on
every job, and on such a wide range of project types,
we have full knowledge of which methods are most
suitable to the task at hand, and how to communicate efficiently to develop a full understanding of your needs and how best to serve you.

Planning is the most important tool to economically
serve a project with a variety of field and office activities. Towill performs field topographic surveys for design to produce maps at a wide range of scales, using both GPS and conventional surveying equipment and
techniques. Such surveys are typically performed to
produce a detailed map for engineering design or as
supplemental data collection to enhance and complete photogrammetric mapping.

We have experience performing virtually every type of
field topographic surveying task, including:
• Detailed site surveys for design and construction
purposes (including location of surface and
underground utilities, monitoring wells, curb and
gutter lines, and building pad elevations);
• Cross-section and profiling along rivers, canals,
and levees for hydraulic analysis and design;
• Surveys of bridges and surrounding topography;
• Surveys of tunnels and the interior of large
diameter pipelines; and
• Surveys to check and complement
photogrammetric mapping.

For many of our clients, Towill has conducted multiple
site topographic surveys. We have in-house access
to some of the latest technology available for these
types of tasks. Utilizing robotic one-man instruments
allows us to have more experienced field staff conducting our topographic data acquisition. With very precise and accurate measuring devices, we often utilize reflectorless technology to acquire the information needed within streets and other areas of heavy traffic
without impeding traffic flow.

Whether the site is large or small, with Towill’s unique capability to complete photogrammetric compilation
in house, we will be able to find the most economical
solution to your needs.

Photogrammetric Mapping
Photogrammetric mapping is the process by which
aerial photography is used to produce planimetric and
topographic maps of the earth’s surface and features
of the manmade environment. Photogrammetric
mapping represents a very important business line
for Towill, accounting for an average of 35% of our
company’s annual revenue. Moreover, photogrammetric mapping is not an ancillary professional service at Towill; many of our most highly accomplished and
experienced personnel have dedicated their careers
to advancing Towill’s photogrammetry operations and
providing a level of service far above the competition.

Prior to the execution of the primary data collection
mission described herein, Towill will either recover and target existing ground control positions, or, if needed, establish and target new ground control
positions throughout the AOI. Using the digital image,
ground control, and ABGPS/IMU data, Towill will prepare a Fully Automated Analytical Aerotriangulation (FAAT) solution to establish supplemental control for
orienting individual photogrammetric stereo-models
covering the entire AOI. Upon completion of the FAAT
solution, survey/map documents, such as planimetric
features, contours, or color orthophotography, can be
prepared as-needed anywhere and at any time within
the AOI.

Boundary and Right of Way Surveys
Towill has extensive experience and expertise in
boundary and property surveys for land and parcel
determination, performing tens of thousands of surveys over our 64-year history. The initial step to any successful boundary survey is performing the proper
research of land records. Public records research is
required to identify primary control, right-of-way information, and boundary lines, or lines of occupation, before performing the work. Research may be performed at city or county offices, utility agencies, title City Council
16 16 – 331 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
companies, or other appropriate sources. Necessary
records are identified, organized, and analyzed for the field and office tasks.

Once the research is complete and all documentation
associated with a boundary has been analyzed, we
can prepare highly accurate calculations of where we
can expect to locate monumentation associated with
the boundary determination. Throughout the course of
the field survey (which utilize both GPS and conventional survey techniques), adjustments can be made to further enhance the accuracy of the search locations and minimize the amount of field time required to complete the survey. When survey results are
returned from the field, they are compared to record
deeds and maps and the boundary analysis is performed. With years of experience, we can efficiently and accurately complete the boundary process, compiling an accurate and defendable survey.

Towill’s team of surveyors has the experience and
knowledge to tackle any and all boundary surveys,
from public land surveys to subdivision retracements
and establishment of centerlines. Towill consistently remains informed of changes in local, state, and federal laws pertaining to surveying and is very active in continuing education to ensure we remain current.

When locations are returned from the field, they are
compared to record deeds and maps, and the boundary analysis is performed. With our years of experience, we can efficiently and accurately complete the boundary process, compiling an accurate and defendable survey.

According to the California Professional Land Surveyors’ Act, a Corner Record may be used to perpetuate, rehabilitate, or reestablish monumentation that has
existed in the past in other circumstances; and, when
more extensive work is required, or several monuments in the same area are in question, it may be necessary to file a Record of Survey map. Records of
Survey will clearly identify project horizontal control, record map information, and additional data, and lines
and calls prepared in the initial boundary surveys
phase. Once a map is ready, our project manager
will submit the document to the City for review and to
Orange County for map checking. Any comments will
be addressed, and the document will then be filed at
the County Recorder’s Office for recordation.

Deliverables
Major deliverables anticipated with this on-call project include, but are not limited to, the following:
• CVS point file in P,N,E,Z,D of survey points
• PDF copy of Field Notes
• One set of stakes set in the field
• Planimetric features in MicroStation V8 format
• DTM surface data in MicroStation V8 format
• PDF copy of Pre-Construction Corner Records
• PDF copy of Post-Construction Corner Records
• Pictures collected in the field
• Cut sheets
• Color digital orthophotography in GeoTIFF format
• Design-scale contours
• Record of Survey report
• Hard copy survey/map documents
• Miscellaneous project reports
Schedule/Timeline
Considering that the City intends to enter into an oncall contract that will have a wide range of scope, we are not able to provide a schedule for work that is yet to be defined. However, within our response to the
City’s RFP, we have demonstrated our ability to respond to the most demanding of schedules. To further support this claim, we offer the following schedule as
an example of a project we recently completed for a
nearby city in San Bernardino County.

The scope of this project included construction survey and staking services for a federally funded Safe Routes to School improvement project with two project locations totaling approximately 1.1 miles of dense urbanized roadway.

Improvements at each location included bicycle
lanes, sidewalk, curb and gutter, ADA-accessible curb
ramps, commercial driveways, residential driveways,
and asphalt concrete pavement for minor street widening.

Towill’s scope of services included the following:
• Site control through the recovery of street
centerline monumentation and establishment of
temporary site control for staking operations;
• Rough grade stakes for rough grading and
clearing and grubbing;
• Asphalt concrete and concrete demo limits;
City Council
17 16 – 332 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
• Grade stakes for curb and gutter, driveway
replacement/reconstruction, existing utility finish
grade adjustment, and under sidewalk drains;
• Monument preservation; and
• Miscellaneous surveying by a two-person crew
(the Client requested a budget of 80 hours).

Fee Proposal
As requested in the RFP, our fee proposal is
included in a separately sealed envelope labeled
“Fee Proposal.”
Certifications
Signed certification forms are included in the
Appendix.

City Council
18 16 – 333 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
Appendix
Per the requirements of the City’s RFP, Towill has
included the required forms and documents listed
below on the following pages.
• Attachment 3-1: Non-Collusion Affidavit
• Attachment 3-2: Non-Lobbying Certification
• Attachment 3-3: Non-Discrimination Certification
• LAPM Exhibit 10-O1: Consultant Proposal DBE
Commitment
• LAPM Exhibit 10-O2: Consultant Contract DBE
Commitment
• LAPM Exhibit 10-K: Consultant Certification
of Contract Costs and Financial Management
System
• Resumes for all proposed team members
City Council
19 16 – 334 5/2/2023
City of Santa Ana RFP No. 19-090
Professional Land Surveying Services
Submitted October 24, 2019
City Council
20 16 – 335 5/2/2023
City Council
21 16 – 336 5/2/2023
City Council
22 16 – 337 5/2/2023
City Council
23 16 – 338 5/2/2023
City Council
24 16 – 339 5/2/2023
City Council
25 16 – 340 5/2/2023
City Council
26 16 – 341 5/2/2023
City Council
27 16 – 342 5/2/2023
City Council
28 16 – 343 5/2/2023
City Council
29 16 – 344 5/2/2023
City Council
30 16 – 345 5/2/2023
City Council 16 – 346 5/2/2023

EXHIBIT C
City Council 16 – 347 5/2/2023
Name/Title/Classification Base Year Year 2 Year 3 Year 4 Year 5 Marvin Miller*- Principal-in-Charge $239.87 $251.86 $264.46 $277.67 $291.55 Jake Kruger* - Principal Land Surveyor $246.01 $258.32 $271.24 $284.80 $299.04 James Rios* - Survey Project Manager $198.29 $208.21 $218.63 $229.57 $241.05 Frank Borges* - QA/QC Lead $246.01 $258.32 $271.24 $284.80 $299.04 Senior Land Surveyor $253.40 $266.06 $279.37 $293.34 $308.02 Project Surveyor $176.26 $185.08 $194.33 $204.05 $214.25 Associate Surveyor $148.24 $155.66 $163.43 $171.62 $180.19 Survey Office Technician $125.18 $131.45 $138.04 $144.94 $152.20 Survey CADD Technician $95.53 $100.30 $105.32 $110.60 $116.13 Project Coordinator $94.70 $99.43 $104.39 $109.60 $115.07 Geomatics Specialist $253.40 $266.06 $279.37 $293.34 $308.02 Senior Geomatics Analyst $164.71 $172.96 $181.60 $190.68 $200.21 Geomatics Analyst $118.59 $124.51 $130.74 $137.27 $144.15 Geomatics Technician $100.49 $105.51 $110.79 $116.32 $122.14 Certified Party Chief** $196.88 $206.73 $217.07 $227.91 $239.29 Licensed Party Chief** $202.32 $212.43 $223.05 $234.21 $245.91 Party Chief** $190.33 $199.86 $209.84 $220.33 $231.33
Chainman/Rodman** $173.60 $182.27 $191.38 $200.95 $210.99 Apprentice** $138.87 $145.81 $153.10 $160.74 $168.77
Saturdays and over 8 hours on weekdays -1.5 times the above Regular Rate | Sundays and Holidays - 2.0 times the above Regular Rate NOTES:

1. Key personnel are indicated with an asterisk and employees subject to prevailing wage requirements are indicated with 2 asterisks.

2. Non-Exempt personnel are indicated with italic text.

3. Escalated hourly rates will take effect on April 1 of each subsequent year following the contract base year (04/01/23 - 03/31/24).

4. Field survey personnel and crews are invoiced a minimum of 4 hours per mobilization and then in 2 hour increments up to 8-hours.

CITY OF SANTA ANA, CALIFORNIA

LAND SURVEY SERVICES HOURLY RATE SCHEDULE
Effective April 1, 2023 - March 31, 2028

AUTHORIZED OVERTIME LABOR RATES
City Council 16 – 348 5/2/2023
Public Works Agency
www.santa-ana.org/public-works
Item # 17
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 2, 2023
TOPIC: Agreement with David Evans and Associates, Inc. for Landscape Architectural Design Services For 10th and Flower Park

AGENDA TITLE
Approve an Agreement with David Evans and Associates, Inc. in an Amount Not to Exceed $410,000 for the Landscape Architectural Design Services for a New Park at 10th St. and Flower St. for a Three-Year Term (Project No. 22-1342) (Non-General Fund) (Revive Santa Ana)

RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with David Evans and Associates, Inc. to provide design, development of contract documents, and construction support for the proposed 10th and Flower Park project in the amount of $369,455, with a contingency of $40,545 for a total amount not to exceed $410,000, for a three-year term beginning May 2, 2023 and expiring May 1, 2026, with an option for two, one-year extensions, subject to non-substantive changes approved by the City Manager and City Attorney.

DISCUSSION
On August 2, 2022, the Santa Ana City Council approved the Revive Santa Ana Spending Plan that reflected the entire American Rescue Plan Act (ARPA) allocation of local fiscal recovery funds. This site was allocated ARPA funding for Public Health and Safety to acquire additional space for a park. On January 27, 2023, the Public Works Agency released Request for Proposal (RFP) No. 22-124 to seek the services of a professional engineering firm to provide landscape architectural design, development of contract documents, and construction support services for the proposed 10th and Flower Park project. The project will provide the community with access to open space, exercise, and recreation facilities.

The RFP was advertised on the City’s online procurement management and publication system with proposals due on February 20, 2023. Seven proposals were received and evaluated by a selection committee. Based on criteria outlined in the RFP, the following summarizes the top three responding firms and their ranking.

City Council 17 – 1 5/2/2023
Approve Agreement for 10th and Flower Park
May 2, 2023

Page 2 ends

Firm City Rank
David Evans and Associates, Inc Tustin, CA 1
PlaceWorks Santa Ana, CA 2
David Volz Design Costa Mesa, CA 3
The top rated proposer strongly demonstrated their understanding of the project by opting to include a challenges and solutions section, based on a comprehensive site assessment that they elected to conduct as part of their proposal preparation. Staff recommends awarding an agreement to David Evans and Associates, Inc. (Exhibit 1) to provide design services based upon the scope of work and selection criteria outlined in RFP 22-124. Their proposal demonstrated the firm has the necessary capacity and expertise to complete the required services. The firm’s rates are reasonable and within industry standard, the team qualifications are appropriate for this project, and the proposal was determined to provide the best value for the City.

FISCAL IMPACT
Funds are budgeted and available for expenditure in the current Fiscal Year 2022-23 Capital Improvement Program (Project No. 22-1342). The table below indicates the estimated expenditures by fiscal year. Any remaining balances not expended at the end of the agreement term will be carried forward for expenditure in the event the optional extension periods are exercised. If the project delivery extends beyond the ARPA spending rules, an alternative source of funds will need to be identified.

Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers to FY 23-24.

Fiscal
Year
Accounting
Unit –
Account No.

Fund
Description
Accounting Unit –
Account No. Description Amount
2022-23
18117013-
66220
(22-1342)
American
Rescue Plan
Act of 2021
(ARPA)
American Rescue Plan ActPWA – Improvements Other
Than Buildings
$410,000
TOTAL: $410,000

EXHIBIT(S)

1. Agreement with David Evans and Associates, Inc.

Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Kristine Ridge, City Manager
City Council 17 – 2 5/2/2023

Page 1 of 10 ends

AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
DAVID EVANS AND ASSOCIATES, INC. FOR LANDSCAPE ARCHITECTURAL DESIGN SERVICES FOR 10TH AND FLOWER PARK PROJECT
THIS AGREEMENT is made and entered into this 2nd day of May 2023 by and between David Evans and Associates, Inc. (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).

RECITALS
A. On January 27, 2023, the City issued Request for Proposal No. 22-124, by which it sought a qualified consultant to provide design, development and contract documents for the proposed 10th and Flower Park project (Project No. 22-1342).

B. Consultant submitted a responsive proposal that was selected by the City.

Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP No. 22-124.

C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional contracting firm in the field.

NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:

1. SCOPE OF SERVICES
Consultant shall perform the services described in the Scope of Work that was included in RFP No. 22-124, attached hereto as Exhibit A and fully incorporated herein by this reference, and as further described in Consultant’s Proposal, attached hereto as Exhibit B and fully incorporated herein by this reference.

2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services under this Agreement, the rates and charges identified in Consultant’s Fee Schedule, which is attached hereto as Exhibit C and fully incorporated herein by this reference. The total sum to be expended under the term of this Agreement, including any extension periods, shall not exceed Four Hundred Ten Thousand Dollars and Zero Cents ($410,000.00). The $410,000.00 sum is comprised of (1) the base amount of $369,455.00 and (2) a contingency in the amount of$40,545.00 for additional services at the City’s sole discretion. b. Payment by City shall be made within forty-five (45) days following receipt of EXHIBIT 1
City Council 17 – 3 5/2/2023

Page 2 of 10 ends

proper invoice evidencing work performed, subject to City accounting procedures.
c. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals and Scope of Work, which may reasonably be expected by City.

3. TERM
This Agreement shall commence on the date first written above and terminate on May 1, 2026, unless terminated earlier in accordance with Section 17, below. The term of this Agreement may be extended for up to two (2), one-year periods upon a writing executed by the City Manager and City Attorney.

4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared City Council 17 – 4 5/2/2023

Page 3 of 10 ends

or caused to be prepared by Consultant under this Agreement (“Documents & Data”).

Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.

7. INSURANCE
Consultant shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors. a. Minimum Scope and Limit of Insurance
(1) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. (2) Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if Consultant has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with a limit no less than $1,000,000 per accident for bodily injury and property damage.
(3) Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
(4) Professional Liability (Errors and Omissions): insurance appropriate to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate.
(5) Broader Coverage: if the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

City Council 17 – 5 5/2/2023

Page 4 of 10 ends

b. Other Insurance Provisions
(1) Additional Insured Status: The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connectionwith such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if notavailable, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 2037 if a later edition is used).
(2) Primary Coverage: For any claims related to this contract, the Consultant’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers.

Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.
(3) Notice of Cancellation: Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City. (4) Waiver of Subrogation: Consultant hereby grants to City a waiver of any right to subrogation that any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance.

Consultant agrees to obtain any endorsement that may be necessary to affect this waiverof subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(5) Self-Insured Retentions: Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City. (6) Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
(7) Claims Made Policies: If any of the required policies provide coverage on a claims-made basis:

City Council 17 – 6 5/2/2023

Page 5 of 10 ends

i. The Retroactive Date must be shown, and must be before the date of the contract or the beginning of contract work.
ii. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
iii. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of work. (8) Verification of Coverage: Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing allpolicy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them.

The City reserves the right to require complete, certified copies of all required insurance policies,including endorsements required by these specifications, at any time.
(9) Subcontractors: Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(10) Special Risks or Circumstances: City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, consultants, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant or its subconsultants, agents, employees, or other persons acting on their behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement.

This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising City Council 17 – 7 5/2/2023

Page 6 of 10 ends

from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend, indemnify and hold harmless the City, its officers, agents, representatives, and employees against any and all liability, including costs, and attorney’s fees, for infringement of any United States’ letters patent, trademark, or copyright contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.

10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.

11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means.

Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without City Council 17 – 8 5/2/2023

Page 7 of 10 ends

reference to information disclosed by the City.

12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interest and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.

13. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:

To City: Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Executive Director
Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, CA 92702
To Consultant: David Evans & Associates, Inc.
17542 E. 17th Street, Suite 150
Tustin, CA 92780
Attn: Kim S. Rhodes, Vice President, Principal in Charge A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.

14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant regarding the subject matter herein, and supersedes any and all other agreements, oral City Council 17 – 9 5/2/2023

Page 8 of 10 ends

or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein.

15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City’s prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultants retained by City.

16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.

17. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work that fails to meet the standard of performance specified in the Recitals of this Agreement.

18. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic City Council 17 – 10 5/2/2023

Page 9 of 10 ends

information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.

19. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.

20. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.

21. FUNDING-RELATED PROVISIONS
Funds from the Coronavirus State Fiscal Recovery Fund and/or the Coronavirus Local Fiscal Recovery Fund, together known as the Coronavirus State and Local Fiscal Recovery Funds (“CSLFRF”) program, will be used to fund all or a portion of this Agreement. As applicable, Consultant shall comply with all federal requirements including, but not limited to, the following, all of which are expressly incorporated herein by reference:
a. Sections 602 and 603 of the Social Security Act as added by Section 9901 of the American Rescue Plan Act of 2021 (the “Act”);
b. U.S. Department of the Treasury (“Treasury”) Final Rule for the Act, available at https://www.govinfo.gov/content/pkg/FR-2022-01-27/pdf/2022-00292.pdf; c. Treasury Compliance and Reporting Guidance for the Act, available at https://home.treasury.gov/system/files/136/SLFRF-Compliance-and-Reporting-Guidance.pdf; d. 2 C.F.R. Part 200 – Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, other than such provisions as the U.S. Department of the Treasury may determine are inapplicable to the CSLFRF program and subject to such exceptions as may be otherwise provided by the U.S. Department of the Treasury; e. Treasury Coronavirus Local Fiscal Recovery Fund Award Terms and Conditions; City Council 17 – 11 5/2/2023
City Council 17 – 12 5/2/2023

EXHIBIT A
City Council 17 – 13 5/2/2023
City of Santa Ana RFP 22-124
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

LANDSCAPE ARCHITECTURAL DESIGN SERVICES
FOR
A NEW PARK AT 10TH & FLOWER STREETS
RFP NO. 22-124

INTRODUCTION/PROJECT BACKGROUND
The proposed new park at 10th and Flower Streets will be a new 0.65 acre neighborhood park located at the southeast corner of 10th Street and Flower Street, just north of Civic Center Blvd.

The intent of this park is to provide the local community with access to open space, exercise and recreation facilities. Based on input from the local community, the project will include, but is not limited to, the following project components:
• Park concept plan
• Playground Area, with rubberized play surface
• Exercise Area
• Canvas shade structures
• Turf play area
• Site lighting (new electrical service)
• Water wise landscaping, with shade trees
• Automated irrigation system (new water service)
• Site Furnishings (benches, bike racks, trash receptacles, drinking fountain, picnic tables) • Park monument sign
• Feasibility study to incorporate Garnsey Avenue ROW into project • Perimeter ROW improvements
• WQMP, as applicable
The site is currently comprised of six separate parcels (APN’s 005-142-34, 005-142-35,005-142- 47, 005-142-48, 005-142-49, 005-142-58). The six lots are currently identified as Low Density Residential (LR-7) land use and zoned Professional (P). They are all currently vacant dirt areas.

The Assessor’s Parcel Map and Photos of the existing site condition can be found in the Appendix of the RFP as Attachment 4.

City Council 17 – 14 5/2/2023
City of Santa Ana RFP 22-124
Page A1-2

CONSULTANT SERVICES
Consultant shall be responsible for the preparation and submittal of the PS&E package through completion with the approval from City to release for construction. This shall include, but not limited to, survey, civil engineering, landscape, hardscape and irrigation design and electrical engineering. Any additional tasks deemed necessary by the Consultant shall be clearly identified in the proposal.

A. PROJECT COORDINATION. The consultant shall be fully responsible for overall management and coordination of the project, which may include but is not limited to, project development team meetings, liaison with affected agencies, community outreach and utility companies. In addition, Consultant shall also prepare progress reports, schedule, secure permits for all field studies and any other required permits from other agencies.

B. RECORDS RESEARCH. The consultant shall research all information pertinent to the project including, but not limited to, existing field condition, as-built plans and record drawings, right-of-way data and all future improvement plans adjacent to or affecting the project site. The selected consultant shall identify all existing and proposed facilities within the projects limits and note any potential conflicts.

C. PRELIMINARY DESIGN. The consultant shall organize a kick-off meeting with City staff to discuss the conceptual design plan, project goals and objectives, potential elements and issues, project schedule, review of existing information, and conduction of a site investigation. City staff shall be provided with final rendered conceptual site plan of the proposed park, final 3-D rendered conceptual exhibits, and a final schedule prior to the consultant beginning work on the PS&E package.

D. SURVEY. On-the-ground field topographical survey work is required for the Consultant (and/or the Consultant’s Subconsultant) to identify existing horizontal and vertical features that are needed for the project. It is the Consultant’s responsibility to provide only the survey necessary for the design of the project components identified within this RFP. Consultant shall identify in the proposal a detail list of features the survey would include. Design level survey and base mapping of the project site shall be prepared in US Customary English units by a California licensed Land Surveyor in accordance with the City guidelines and in Microstation CONNECT Computer Aided design and Drafting (CADD) format. The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88.

E. WATER QUALITY. The Consultant shall coordinate with the City for the Low Impact Development (LID) requirements of the project and prepare a Water Quality Management Plan (WQMP) if deemed required. Consultant shall provide BMPs with appropriate size based on treatment and peak flow rates, freight to job site and one year of maintenance to include units and cost in the engineer’s cost estimate.

City Council 17 – 15 5/2/2023
City of Santa Ana RFP 22-124
Page A1-3
The selection of Best Management Practices (BMPs) will always be subject to site specific conditions and the Consultant will be required to perform the research into the site specific conditions (e.g. prior contamination, depth to groundwater, soil conditions, interfering utilities, etc.) that could preclude infiltration. The Consultant shall also perform the required soils and/or infiltration testing per the Technical Guidance Documents, as necessary to design the infiltration system assuming it is the selected LID approach.

Please find information and links to relevant documents and regulations at the following site:
http://ocwatersheds.com/documents/wqmp.

F. PUBLIC OUTREACH. The Consultant shall be available for a minimum of 2 public outreach meetings to present the project to the community. The Consultant will be responsible for organizing, promoting and facilitating these meetings and will provide all presentation material, graphics, rendering (up to 2) rendering and any other printed materials. The meeting will serve to discuss key project aspects, benefits to the community, and consequences of the project, gain input from local residents on design or aesthetic features of the project. The City will assist in providing available meeting spaces by coordinating with City facilities.

G. UTILITY COORDINATION. The Consultant shall be responsible for all utility coordination efforts, including but not limited to; coordination with Edison for any electrical service connections, and water service connections for irrigation and water fountains.

H. CIVIL ENGINEERING PLANS. The consultant shall be responsible for the preparation of any civil engineering plans required for this project including, but not limited to, the following; Horizontal and Vertical Control plan, On-site Grading and Drainage plan, Site Utility Plan, and plans to include concrete alley improvements and minor off-site repair work along new park right-of-way.

I. LANDSCAPE AND IRRIGATION PLANS. The consultant shall be responsible for the preparation of any landscape architectural plans required for this project including, but not limited to, the following; Site Layout/Construction Plans and Details including all architectural feature components identified in the introduction portion of this RFP, Site Sections (as applicable), and Planting and Irrigation (plans, Details, Notes, Calculations).

J. ELECTRICAL PLANS. The consultant shall be responsible for the preparation of any electrical plans required for this project including, but not limited to, the following; Electrical Site Plan to include walkway lighting, shade structure lighting, basketball court lighting, parking area lighting, irrigation, Location of panels, switchgear, meters, Schedules, Details, Photometric Analysis, and Notes.

K. PLANS, SPECIFICATIONS AND ESTIMATES (PS&E)
City Council 17 – 16 5/2/2023
City of Santa Ana RFP 22-124
Page A1-4

1. Development of Plans, Specifications and Estimate (PS&E):
a) All reports, plans, specifications and quantity calculations shall conform to criteria, policies, procedures and standards of the City. The Consultant shall use the boilerplate for cut sheets, specifications and estimates provided by the City. b) The plan development shall include four (4) milestone deliverables—30%, 60%, 90% (pre-final) and 100% (final). All plan sheets shall be prepared at a reasonable standard scale to be noted on plans. The necessary plans for each PS&E package shall include, but are not be limited to:
oTitle Sheet
oCivil Engineering
oErosion Control Plan
o Horizontal and Vertical Control Plan
o Parking lot and alley
o Grading (including precise) and On-Site Drainage plan o Site Utility Plan (for drinking fountain)
oBasketball Court
o Skate Board Court
oCanvas Shade Structure
oPedestrian Bridge
o Playground
o Decomposed Granite/Decorative Concrete Walkways
oLandscape and Irrigation
o Site Layout/Construction Plans and Details
o Site Sections, as applicable
o Planting Plans/Details/Notes
o Irrigation Plans/Details/Calculations/Notes
o Monument Detail
oElectrical
o Electrical Site Plan to cover walkway , shade canopy, turf, monument signs, basketball court, and parking lot
o Location of panels, switchgear, meters
o Single Line Diagram
o Schedules
o Details
o Photometrics
o General Notes
c) All calculations for the design and quantities shall be submitted as part of the PS&E submittal requirements. Quantities for all contract pay items shall be substantiated by calculations. Quantity calculations shall be neat and orderly and shall show all sketches, diagrams, and dimensions necessary to allow them to be independently used by field inspectors during construction. All quantity calculations shall be independently checked City Council 17 – 17 5/2/2023
City of Santa Ana RFP 22-124
Page A1-5
and substantiated with independent calculations.
d) Electronic files for all CADD (in Microstation CONNECT), reports, and calculations shall be submitted at the end of contract or when requested by the City. e) All electronic software developed, databases generated, spreadsheets and intellectual properties developed during the life of the Agreement shall become the properties of the City.

2. Deliverable PS&E package:
a) 30% PS&E
The package shall include the final/approved concept layout and preliminary park improvement plan, which includes hardscape, landscaping and irrigation, lighting, cost estimate, and alley and parking lot improvements.
b) 60%, 90%, and 100%
1) The Consultant shall submit the following documents for review and approval:

Each milestone submittal shall include the electronic files of the following documents: Plans, Standard Special Provisions (SSP), preliminary quantities and estimates, pay item list, design calculations and all reports supporting the design (i.e. geotechnical report, hydraulic report).
2) The City reviews and comments on the PS&E package within four (4) weeks of receipt of the complete milestone PS&E package.
3) Constructability review meeting shall take place at 90% and shall include Consultant and City engineering staff. Prior to the City conducting the constructability review, the Consultant shall submit the QA/QC set of PS&E performed by the Consultant independently.
4) The City may request a set of QA/QC plans and estimates at any point during the design process to include methods for design and calculations. 5) The Consultant shall provide a final colored rendering of the project reflecting all items identified within the final construction documents. c) Final PS&E for Approval and Bidding
The Consultant shall submit all electronic files (CADD, Word document, and Excel) and one set of PDF for the following documents for construction Bid purpose:

City Council 17 – 18 5/2/2023
City of Santa Ana RFP 22-124
Page A1-6
Signed final design plans
Signed final specifications
Signed QA/QC Checklist
Final cost estimate and final quantity calculations
Final design calculations

3. Construction Bidding Phase:

Bidding procedures will be the responsibility of the City. While the PS&E construction package is advertising for bids, all questions concerning the intent shall be referred to the City for resolution. In the event that any item requiring interpretation in the drawings or specifications is discovered during the bidding period, said items shall be analyzed by the Consultant for decision by the City.

4. Construction Support Phase:
a) This task shall be included as optional in the fee proposal b) Consultant shall furnish, at the consultant’s sole cost and expense, all necessary revised documents and drawings due to errors and omissions of the Consultant. c) Consultant shall review and approve all submittals and shop plan drawings required to support the construction contract. Consultant shall complete shop drawings reviews within two (2) weeks of receipt. Contract Change Order reviews shall be completed within two (2) working days of receipt.
d) Consultant shall be available as requested by the City to resolve discrepancies in the contract documents. Consultant shall bring to the attention of the City any defects or deficiencies in the work by the construction contractor which the Consultant may observe.

Consultant shall have no authority to issue instruction on behalf of the City, or to deputize another to do so.
e) The Consultant shall prepare and deliver to the City the final as-built plans incorporating field marked prints supplied by the City. Upon completion of construction, the City will submit field-marked prints to Consultant. Consultant shall incorporate all changes to the plans electronically with all necessary revision notations and submit to the City.

GENERAL REQUIREMENTS

1. The Consultant has total responsibility for the accuracy and completeness of the plans and related designs, specifications and estimates prepared and shall check all such materials accordingly. The plans will be reviewed by the City for conformity with the requirements of the Agreement. Reviews by the city do NOT include detailed review or checking of design or the accuracy with which such designs are depicted on the plans. The responsibility for accuracy and completeness of such items remains solely that of Consultant.

City Council 17 – 19 5/2/2023
City of Santa Ana RFP 22-124
Page A1-7

2. Consultant or its sub consultants shall not incorporate in the design any materials or equipment of single or sole source origin without written approval of the City.

3. The plans, specifications, estimates, calculations, and other documents furnished under the Agreement shall be of a quality acceptable to the City and State. The criteria for acceptance shall be a product of neat appearance, well organized, technically and grammatically correct, checked, dated, and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings shall be that of similar types produced by the City Boiler Plate. The Consultant shall modify its work as necessary to meet the level of acceptability defined by the criteria above.

4. Specification language must be incorporated in the contract document according to its technical section and shall not be placed on the plans.

5. The Consultant shall have a quality control plan in effect during the entire time work is being performed under the Agreement. The Quality control plan shall establish a process whereby plans are independently checked, corrected and back checked, and all job related correspondence and memoranda dated and received by affected persons and then bound in appropriate job files. Plan check shall also be provided by the City of Santa Ana’s Engineering Division, Building and Safety Department, Planning Division and the Parks and Recreation Department. Reviews by the City respective Divisions shall be coordinated by the City.

6. Manuals/Standards
Where applicable, engineering design of all PROJECT improvements shall be compatible and in accordance with the latest editions of following publications:
a. City of Santa Ana Standard Plans
b. California Building Code (CBC)
c. Standard Special Provisions for Public Works Construction It will be the responsibility of the Consultant to verify that it has received the latest version or update of these documents.

7. Street improvement plans shall adhere to City of Santa Ana Standard Plans and the Standard Special Provisions for Public Works Construction. Plans shall be computer drafted in Microstation CONNECT format and shall adhere to the current City of Santa Ana Public Works Agency Interagency CAD standards.

8. The Consultant’s work will be subject to inspections by representatives of the City.

9. Project Progress
a. Meetings - Progress Review Meetings shall be held as deemed appropriate by the City. b. Progress Reporting - Progress Reports shall be submitted at monthly intervals, indicating progress achieved during the reporting period in relation to the progress scheduled.

City Council 17 – 20 5/2/2023
City of Santa Ana RFP 22-124
Page A1-8
c. Project Schedule - The Consultant shall prepare the project schedule in Microsoft Project format. The project schedule should break the tasks and subtasks. Any major change to the project schedule must be approved by the City.

10. The responsible-charge of the project shall be a licensed professional landscape architect or professional civil engineer and shall sign and stamp title sheet and contract document.

Landscape architectural, Civil, and electrical plans shall be signed by California licensed professionals according to their discipline.

PAYMENT AND INVOICING:

Selected Consultant shall invoice the City based on time and material according to the City’s standard invoice template. Tasks and hours shall be clearly identified and all rates must match those included in the approved agreement. City shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

Each invoice must include a Consultant Progress Report that contains tasks and activities completed and summary of work in the next month period. Certificate of insurance must be current in order for invoices to be processed.

CITY RESPONSIBILITIES:

The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein.
• City staff will be responsible for the General Plan Amendment from Low Density Residential (LR-7) to Open Space (O), an Amendment Application to change the zoning district from Multi-Family Residence (R3) to Open Space Land (O) and the lot merger process.
• Furnish scope of work and provide general direction as needed for the assigned project. • All plan check coordination within the City
• Advertise, award, and administer of construction contract • Electronic files (sample plans & specifications, City of Santa Ana’s CADD Standards) • Electronic files for title sheets and sheet borders
• Facilitate meeting space and coordination and City facilities CONSULTANT RESPONSIBILITIES:
• Provide all required insurance as outlined in Attachment 2 of this RFP. • Submit renewal of Certificate of Insurance 30 days before expiring. • Ensure Certificate of Insurance is current when submitting invoices.

City Council 17 – 21 5/2/2023

EXHIBIT B
City Council 17 – 22 5/2/2023
i | June 1, 2021 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design for Standard-McFadden Park — RFP No. 21-055 Proposal to provide
Landscape Architectural Services for
10th and Flower Park
RFP No. 22-124
Submitted by
Heath Habig, PLA #5028
Project Manager
David Evans and Associates, Inc.
17782 17th Street, Suite 200
Tustin, CA 92780
Submitted to
Suzi Furjanic
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
February 28, 2023
City Council 17 – 23 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 1 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Table of Contents
Section Description Page
Section A Cover Letter ................................................................... 2 Section B Contract Agreement Statement ................................... 3 Section C Firm and Team Experience ........................................... 3 Section D Project Understanding ................................................... 6 Section E Relevant Project Experience....................................18 Section F References...............................................................19 Section G Fee Schedule (provided under separate sealed envelope) Appendix A Resumes ......................................................................A-1 Appendix B Forms............................................................................B-1 Attachment 3-1: Non-Collusion Affidavit
Attachment 3-2: Non-Lobbying Certification
Attachment 3-3: Non-Discrimination Certification
Appendix C Subconsultants Comprehensive Scope of Work.....C-1 City Council 17 – 24 5/2/2023
2 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 February 28, 2023
Ms. Suzi Furjanic
City of Santa Ana
Public Works Agency; M-36
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701
RE: PROPOSAL TO PROVIDE LANDSCAPE ARCHITECTURAL DESIGN SERVICES FOR 10th AND FLOWER PARK, RFP NO. 22-124
Dear Suzi:

On behalf of David Evans and Associates, Inc. (DEA), we are pleased to provide this proposal for the design of 10th and Flower Park. Our team has had the pleasure of working with the City of Santa Ana (City) on the design and implementation of the award-winning Memory Lane Park and Mariposa Park, in addition to working with Public Works on the design of Standard and McFadden Park which will soon come to fruition. The benefits of working with us include the following.
■ Extensive Understanding of the City and Knowledge of the Proposed Project: DEA has designed similar park projects with the City, and we understand the importance of your potential funding and the project schedule. DEA is pleased to express our sincere interest once again in continuing to collaborate with your team. We have in-house expertise and creativity from our landscape architects, civil engineers, park planners, surveyors, hydrology specialists, irrigation designers and construction team members. We understand the City's desire to design and build a new park through community engagement. Our expertise with public outreach, including availability of bilingual team members, will support your staff as needed during design and construction.
■ Technical, Creative and Efficient Team: Coupled with our extensive portfolio of park projects throughout Southern California, we are an ideal match to team with the City for the development of 10th and Flower Park. We have provided a comprehensive scope of services based on information provided in the City's Request for Proposal. We understand the Coronavirus State and Local Fiscal Recovery Funds (CSLFRF) program has provided initial funding.
■ Team Continuity: We have come together with our same teaming partners including Design West for electrical engineering, Converse Consulting for geotechnical engineering, and Spohn Ranch in the event a skate park is desired. We have provided a comprehensive schedule to indicate how best to accomplish your scheduling needs.

We thank you again for your consideration of our qualifications and look forward to the next step in the selection process. I am a principal of DEA and the main point of contact with legal authority to commit the firm under this contract. Please feel free to contact me at (909) 481-5750 or [email protected] if you have any questions or need additional information.

Sincerely,
DAVID EVANS AND ASSOCIATES, INC.

Kim S. Rhodes, PLA 3867
Vice President, Principal in Charge
City Council 17542 E. 17th Street, Suite 150 Tustin, CA 92780 T: 714.665.4500 F: 714.665.4501 17 – 25 5/2/2023 David Evans and Associates, Inc. | February 28, 2023 | 3 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 B. Contract Agreement Statement
We concur with the contract language; however, if possible, David Evans and Associates, Inc. (DEA) respectfully requests the same language as that which was agreed upon in our Standard and McFadden Park contract, given all parties previously agreed to said language.

C. Firm and Team Experience
DEA has been providing landscape architectural services to the public and private sector for 45 years.

Founded in 1976 on the philosophy of hiring outstanding professionals and giving them the freedom and support to do what they do best, the landscape architecture team at DEA has become well established in Southern California.

DEA has more than 1,000 employee owners and maintains offices in California, Colorado, Idaho, Mississippi, Nevada, New York, Oregon, South Carolina, Texas, Utah, and Washington. We are consistently ranked among Engineering News Record’s Top 100 Pure Design firms in the U.S. and among the leaders in many of our local markets.

DEA Services
DEA has the demonstrated capacity to perform
the required services as described in the request
for proposal, to provide landscape architectural
services for the 10th and Flower Park project. We
have organized an experienced group of individuals
to assist the City to provide a creative, responsive,
technically competent, and efficient team. We are
currently providing similar services to the City of
Santa Ana (City) on the Standard and McFadden
Park project.

DEA will utilize staff from both our Ontario and our
local Orange County office for this contract, located at 17542 E. 17th Street, Suite 150, Tustin, CA 92780.

Our Tustin office is within close proximity to the City of Santa Ana. Our team of technical and professional
landscape architectural staff are supplemented by
experts from across the west to provide the services
needed.

Landscape architecture is an integral part of DEA’s interdisciplinary approach. Our experience includes landscape design services for park and recreation areas, playgrounds, sports fields, trails, streetscape and highways, residential, and commercial site planning. We have worked seamlessly with numerous southern California municipalities providing design services, and have found that an essential element of our recreation, civic and community facility project success is client collaboration. Our best projects have been programmed, planned and designed with extensive input from our clients and their community. When clients are engaged in the process, they know that their interests and their stakeholders’ needs are being addressed. Below are images of our ongoing collaboration on award-winning park design and implementation DEA’s project manager and landscape architecture
team have experience delivering award-winning
parks for the City of Santa Ana
Memory Lane Park Mariposa Park
City Council 17 – 26 5/2/2023
4 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Organizational Chart
Key Staff
Heath Habig | Project Manager: Heath is a senior landscape architect with 26 years of landscape architectural design experience at all phases of the project delivery process including schematic design, design development, construction documentation and construction support. Heath has worked on a wide variety of projects during his career and continues to pull from this experience on city parks, trails, streetscapes, single family housing developments, senior living facilities and commercial sites. He is an experienced project manager and is currently working on the design efforts on Standard and McFadden Park for the City.

Availability: 40%
Kim Rhodes | Principal-in-Charge: Kim is a California registered, award-winning landscape architect, client manager, and vice president with DEA. For the past 37 years, she has been responsible for landscape architectural design and management on numerous projects, including design and planning for parks, trails, streetscapes / roadways, sports facilities, transportation corridors, structure aesthetics, schools and universities, commercial, residential, and industrial developments. She worked with City staff on both the Memory Lane and Mariposa Park projects, and was instrumental in preparing award-winning submittals for Memory Lane Park. She currently assists with QA/QC on Standard and McFadden Park for the City. Availability: 20%
Todd Holmes | Public Outreach: Todd is a California licensed landscape architect with extensive experience in the public sector throughout Southern California. For the past 34 years, he has been responsible for the design and management of a wide variety of projects including neighborhood and community parks, trails, campgrounds, streetscapes, restroom facilities and recreation centers. Todd was also involved in the public outreach efforts on Standard and McFadden Park for the City. Availability: 25% Given our prior success
with park design with the
City, our team includes
Heath Habig, PLA as project
manager and Kim Rhodes,
PLA as principal in charge/
quality manager. Assisting
them will be a team of
landscape architects,
park planners, designers,
irrigation specialists, civil
engineers, and hydrologists
from DEA. We have also
included subconsultants
to provide geotechnical
services, surveying,
electrical/lighting design,
and skate park design if
needed.

City Council 17 – 27 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 5 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Jon Oen | Irrigation Design: Jon is a certified commercial irrigation designer, certified landscape irrigation auditor, and a partner with the U.S. Environmental Protection Agency’s (EPA’s) WaterSense program. For 24 years, he has worked on a wide variety of irrigation projects including parks, streetscapes, interchanges, hotels, resorts, residential, and commercial developments. Jon provides construction observation including submittal review and site visits (main line testing) specifically focused on irrigation systems and controls. He is well versed in the regulatory guidelines associated with AB1881 (Model Water Efficient Landscape Ordinance). Availability: 35%
Mark Oskorus | Civil Engineering Task Lead: Mark has 26 years of experience in the civil engineering profession with hands-on design engineering experience on public works, education, commercial, and residential development projects. Mark has an extensive background in all aspects of computer technology as it relates to the civil engineering profession including grading, street, storm drain, sanitary sewer systems, and water LID design; in addition to coordination with utility companies for relocation and installation of new wet and dry utilities. Mark and his team have been instrumental on the engineering tasks associated with Standard and McFadden Park in the City. Availability: 40% Subconsultants
To assist in supplementing our team, DEA will use the services of the subconsultants below to provide geotechnical, electrical, surveying, environmental, and skate park design services.

CONVERSE CONSULTANTS | Geotechnical Engineering: Converse is an employee-owned corporation providing geotechnical engineering and geological services. Their professional and technical staff includes inhouse geotechnical engineers, engineering geologists, environmental scientists, deputy inspectors, laboratory and field technicians, drafting/CAD specialists, and other specialized support personnel. Converse is currently working with DEA on the Standard and McFadden Park in the City.

DESIGN WEST ENGINEERING | Electrical Engineering: Design West Engineering is a full-service electrical engineering consulting firm founded on the philosophies of second-to-none service, environmental sensibility, and commitment to forward-thinking innovation. They currently maintain approximately 45 employees offering a diversified range of practical experience in municipal, educational, green-building, transportation, medical, commercial, and residential building sectors. Design West is currently providing electrical engineering services as a subconsultant to DEA on the Standard and McFadden Park for the City.

SPOHN RANCH | Skatepark Consultant: Spohn Ranch began as a community, anchored by Aaron Spohn’s backyard half-pipe, and grew into an award-winning skatepark design-build firm. Via three decades of municipal skatepark projects, Spohn Ranch has mastered a broad range of techniques specific to creating the highest-quality wheel-focused terrain possible. With a firsthand passion for skateboarding and wheel sports, the Spohn Ranch family of highly-skilled craftsmen, including landscape designers, iron workers, grading wizards and ACI-certified shotcrete nozzlemen, pride themselves on designing and building skateparks with the relentless dedication to detail and architectural finesse. Spohn Ranch is currently designing the skatepark elements on the Standard and McFadden Park for the City.

ECORP CONSULTING, INC. (ECORP) | Environmental: Established in 1987, ECORP is a California “S” Corporation that specializes in assisting government agencies and private clients with a wide range of environmental services. ECORP is a financially sound firm with an office in the City of Santa Ana. ECORP’s parks experience includes as-needed environmental services contracts with California Department of Parks and Recreation and Los Angeles County Department of Parks and Recreation as well as individual parks projects for numerous cities throughout southern California.

MEYER LAND SURVEYING | Surveying: Meyer Land Surveying was established in 2015 by Daniel and Charity Meyer to provide Southern California with professional land surveying services. They are an established firm with staff bringing well over 60 years of combined experience. They are SBE certified and Local 12 IUOE members.

City Council 17 – 28 5/2/2023
6 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 D. Project Understanding
Approach and Understanding
THE VALUE OF DAVID EVANS AND ASSOCIATES, INC. (DEA)
Having had the opportunity to partner with the City of Santa Ana (City) on the design and implementation of three similar parks (Memory Lane, Mariposa Park and Standard and McFadden Park), DEA has a significant understanding of the process by which the City has successfully achieved much needed recreational opportunities for the community! All of the parks began with a strong conceptual design developed by the City and further refined through the public outreach process. For the 10th and Flower Park, it will be a collaboration between DEA and the City to develop the conceptual park plan with input from the public. The park is located in an underserved neighborhood with expected enthusiastic involvement from the community and funding from sources requiring strict adherence to project schedules and design programs given grant funding guidelines.
10th and Flower Park will require very similar processes for design and construction and will include design amenities that can be found in the aforementioned list of parks. These park projects were a successful collaboration between the City and DEA. Our interest continues to be a part of the City's goal of providing the local community with access to wellness and recreational facilities.

The City of Santa Ana continues to make great strides in providing parks for the community. 10th and Flower Park will be connected with nearby public transportation and in close proximity to the public library and schools, thus we can expect a busy and vibrant active park with amenities for all. The juxtaposition of the selected park improvements will be important to ensure that we consider safety, visibility, adjacencies, noise, circulation and access.

FUNDING
Based on the information noted in the RFP, the City has secured funding from the Coronavirus State and Local Fiscal Recovery Funds program. The 1.27-acre project site is located at the southeast corner of the W. 10th Street and N. Flower Street intersection and is currently composed of nine separate parcels in addition to Garnsey Street identified as low-density residential land use and zoned Professional. The proposed park design will look to incorporate North Garnsey Street and three residential parcels.

PUBLIC INPUT
We understand that the City would like to hold at least two public outreach meetings during the development of the conceptual plan. The DEA team will provide presentation materials including graphics and renderings such that we can discuss key aspects of the park design by gaining input from local residents on desired park features. The anticipated park elements may include:
■ Hardscape / walkways
■ Playground equipment with rubberized play surface
■ Decorative pedestrian bridge and decomposed
granite walkways (per RFP page A1-4)
■ Canvas shade structures
■ Basketball court (per RFP page A1-4)
■ Exercise area
■ Turf play area
■ Skateboard court (per RFP page A1-4)
■ Perimeter fencing if applicable
■ California friendly / Waterwise landscaping with
shade trees
■ Automatic irrigation system (new water service)
■ Site amenities (park monument sign, benches,
picnic tables, trash receptacles, bike racks and a
drinking fountain)
DEA’s success on previous City park projects,
demonstrates our team's consistent process
and collaboration in delivering quality projects.

City Council 17 – 29 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 7 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 ■ Drainage (utilizing low impact development concepts) / WQMP as applicable ■ Perimeter right-of-way improvements
■ Site lighting with electrical service
■ Feasibility Study to incorporate Garnsey Ave. Right-of-way into the project

EFFECTIVE PROCESS
DEA anticipates working closely with the City to schedule / facilitate community meetings upon award of the contract in order to obtain consensus of the desired park amenities and to determine budgets based on grant pursuits and available funding. Our team has extensive experience with community outreach and workshop facilitation. We will also provide a bilingual design team member at each meeting. We have worked with a number of agencies to assist in expediting construction schedules by utilizing various programs available to cities whereas a reduction in cost is achieved in addition to a savings in the schedule.

SCHEDULE
DEA has prepared a comprehensive schedule that requires full cooperation by our design team members as well as the City and outside agencies to ensure the work is completed in accordance with the City goals as well as the criteria necessary in compliance with potential grant funding. This schedule will be updated at each progress meeting, making adjustments as needed and determining if there are any matters that could cause potential issues, and if so, to determine how to mitigate these concerns. Although still cognizant of safety and wellness protocol, we are flexible with our methods of community outreach and consensus. We also recognize that material and construction costs are still challenging and hence we will address those matters throughout our work effort when developing costs.

Our scope and fee addresses each of the elements denoted in the RFP in addition to the tasks necessary to prepare a comprehensive set of construction documents. Given our extensive experience with award-winning park projects, we look forward to sharing our ideas with you! Scope of Work
A. Project Coordination
The DEA team will attend progress meetings (web based)
once to twice a month with staff throughout the duration of the project in addition to the start-up meeting. Fees are based on an average meeting time of one hour. If additional meetings are required beyond the allocated hours, DEA will provide a scope and fee to supplement this task if needed. This task also includes coordination with affected agencies and utility companies.

Community outreach efforts are included in Item F. below. Given the proximity of our office to the City, we anticipate being available for in-person meetings.

Deliverables: Attendance at project meetings during the conceptual design efforts, design development / construction document phase of work as noted and as allocated in the fee schedule.

B. Records Research
The DEA team will research as-built plans, record drawings, right-of-way data, and future improvement plans that might affect the project site. Existing and proposed facilities will be noted to avoid potential conflicts. This task will work in tandem with Item G below.

Deliverables: Obtaining existing plans as noted above.

C. Preliminary Design
C.1 - Conceptual Plan (30%)
Following a project kick off meeting (including a site visit with staff), the project team will discuss the conceptual design, goals and objectives, potential issues, and overall project schedule. DEA will prepare up to two rendered conceptual plans (no colore) based on input from the community outreach meetings. This task also City Council 17 – 30 5/2/2023
8 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 includes the preparation of one revised plan and rendered conceptual exhibit which incorporates community input. The final color conceptual plan will be a refinement of the City-approved plan. A construction cost estimate and final schedule will be provided and approved by the City prior to commencing work on the PS&E package.

Deliverables: Two conceptual plans, one revised / color plan, construction cost estimate, and final schedule.

C.2 - Preliminary Hydrology and Hydraulics Analysis
DEA will prepare a preliminary drainage study for the project site. A rational method analysis of the site will be performed addressing the pre-and post-construction 10- and 50-year storm events. The rational analysis will determine the pre-and post-construction surface flow and serve as the basis for sizing of on-site drainage facilities to retain the difference in the pre-and post-construction conditions. This analysis, along with the percolation test data provided by the project geotechnical engineer will be used to size the project infiltration system.

Deliverables: Up to two conceptual design plans and one refinement of the selected park design including exhibits as denoted above. This task also includes the hydrology and hydraulic analysis report.

D. Survey (Topographic)
Meyer Land Surveying will perform a field topographic survey and prepare electronic AutoCAD Civil 3D file deliverable for the design team. No hard copy deliverable is included. This portion of the agreement provides for the following:
■ Horizontal and Vertical control will be established to support the project. ■ Horizontal datum will be based on an assumed coordinate system. ■ Vertical datum will be based on Orange County Benchmark nearest to the project (BM# SA-320-89). If required to go farther to locate an existing benchmark, this will be considered an additional service. ■ Cross sections will be located at 25 foot intervals on Flower Street from centerline to east back of walk, on 10th Street from south lip of gutter to south back of walk, and on Garnsey Street from back of walk to back of walk. The southerly limits of the survey will be the southerly property line and its easterly and westerly prolongations. On-site topography will be obtained using a 25’x25’ grid. Topographic survey to also include above-ground utility structures, driveways, signs, trees, and other permanent improvements within the project limits. No overhead items or pavement striping are included. ■ Survey dips of up to a total of 3 sewer manholes and 1 parkway drain within the project limits, and if accessible during the field survey. Subsequent trips due to locked or otherwise inaccessible manholes will be considered an additional service.
■ Manholes will be dipped if and only if deemed safe at the time of the field survey by the field survey crew. If deemed unsafe by the field survey crew then locating dip information on these manholes will be considered out of scope and traffic control will be required to be provided by the client.

Deliverables: 20' scale Topographic Survey as noted above, ASCII list of survey data, parcel base map in MicroStation Connect format.

E. Water Quality
DEA will prepare a Water Quality Management Plan (WQMP) report to include treatment flow rate calculations and descriptions of BMPs and treatment systems in order to provide compliance with water treatment requirements. DEA will also coordinate with the City for the LID requirements and provide BMP's with appropriate size based on treatment and peak flow rates. The team will also perform research into site specific conditions such as prior contamination, depth to groundwater, soil conditions, or utility conflicts, that could preclude infiltration. Soil and infiltration testing will be performed in accordance with the Technical Guidance Documents and in cooperation with the OC Watersheds link provided. Both function and form are important aspects of the design and therefore while we consider the site aesthetics, we will also focus on sustainable issues such as groundwater recharge.

Deliverables: WQMP as noted above.

City Council 17 – 31 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 9 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 F. Public Outreach
DEA will be available for a minimum of two public outreach meetings to gain input from residents on the design and aesthetic features desired within the park site (our scope of services currently includes two meetings; whereas additional public meetings could be subject to additional fees). DEA will organize, help promote (mailing list based on City input) and facilitate these meetings in addition to providing the presentation material (graphics and renderings). The goal of these meetings includes discussing key project aspects, benefits and consequences. DEA will have a bilingual design team member available for each team meeting.

Deliverables: Attendance at two public outreach meetings including assistance with promoting said meetings.

G. Utility Coordination
DEA will perform utility research and coordination in preparation of the site utility plan. This research will include searching for available record utility data within or adjacent to the project limits. DEA will gather available information from the utility purveyors regarding their facilities in the project area. Underground utilities will be mapped by record public information only; subsurface utilities that are not identified on existing record maps will not be shown. The record utility information will be used to determine points of connection for electrical (Edison), irrigation and domestic water in the preparation of a site utility plan.

Deliverables: Data collection, utility research and coordination, preparation of a site utility plan to provide power / electrical, irrigation and domestic water to the project site.

H. Environmental (TBD)
We have assumed that the City will provide the Phase I ESA separately.

The project would be subject to the California Environmental Quality Act (CEQA). Based on our experience with parks projects and the resources in the City of Santa Ana, we have assumed that the appropriate environmental document would be an Initial Study/Mitigated Negative Declaration (IS/MND) with supporting technical studies. ECORP’s scope of work, cost, and schedule for these services are provided below.

ECORP will prepare the CEQA IS/MND and supporting technical studies for biological resources and cultural resources. Models for air quality/greenhouse gas, noise, and energy will be conducted and the results will be included within the IS/MND with supporting modeling data appended to the IS/MND. ECORP has assumed that the analysis in the technical studies and models will not identify any unavoidable significant impacts, and that an IS/MND will be the appropriate CEQA document. ECORP will prepare an Administrative Draft, Draft, Administrative Final and Final IS/MND for the project and will prepare and file the Notice of Intent and Notice of Determination with the State Clearinghouse and Orange County Clerk. ECORP will also mail the NOI to up to 20 addresses and arrange for publication in one local newspaper. ECORP will assist the City with governmentto-government consultation with California Native American tribes under Assembly Bill 52 (AB 52) through drafting notification letters and documentation of the consultation process.

DEA will assess the proposed park to determine if it is required to prepare a VMT analysis for environmental clearance under CEQA. DEA will apply the city’s four criteria to the project and indicate whether the project satisfies any criterion. DEA will document the screening assessment and its most critical conclusion in a technical memorandum which will include any analysis or mapping used as part of the assessment.

I. Civil Engineering Plans
I.1 - Geotechnical Investigation
Project Set-up: Under the direction of the project manager, a staff professional from Converse will set up the project to provide the services outlined under our scope of work. The project set-up will include the following. ■ Coordinate with DEA and the City representative to schedule the field investigation. ■ Perform a site reconnaissance to verify existing conditions.

City Council 17 – 32 5/2/2023
10 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 ■ Review existing geology/geotechnical reports for properties in the vicinity. ■ Stake/mark the boring locations in the field so that drill rig access to all the locations is available. In case, the site has existing underground utilities, a representative from the city MUST clear the boring locations, Converse will not be liable for damage to any unmarked utility. ■ Notify Underground Service Alert (USA) at least 48 hours prior to field exploration to clear the boring locations of any conflict with existing underground utilities.

Subsurface Exploration: Our subsurface exploration will consist of drilling exploratory borings. The purpose of the borings will be to Obtain subsurface information at the site, Obtain undisturbed and bulk samples of the various soil types for laboratory testing, and record depth to bedrock or groundwater (if encountered).

Borings: We will drill 6 borings between 5.0 and 30.0 feet below existing ground surface (bgs) within the project site. If refusal is encountered before the planned depths are reached, the borings will be terminated at that depth.

The borings will be drilled with a truck-mounted (CME 75 or equivalent) rig equipped with an 8- inch diameter hollow-stem auger for soil sampling. Relatively undisturbed ring and bulk samples of the subsurface soils will be obtained at frequent intervals in the borings. The undisturbed samples will be obtained with a California Modified Sampler (2.4-inch inside diameter and 3.0- inch outside diameter) lined with thin sample rings. The soil will be retained in brass rings (2.4 inches in diameter and 1.0 inch in height). The central portion of the sample will be retained and carefully sealed in waterproof plastic containers for shipment to our laboratory.

Bulk soil samples will be collected in plastic bags and brought to our laboratory. Borings will be backfilled with soil cuttings.

The mechanically driven hammer for the sampler is 140 pounds, falling 30 inches for each blow. The number of successive drops of the driving weight (“blows”) required for each six inches of penetration will be shown on the boring log.

The borings will be backfilled with cement grout (if ground water is encountered) and soils cuttings and compacted by pushing down with augers. Where asphalt concrete is penetrated, the surface will be patched with cold mixed asphalt concrete. It is possible the surface may settle over time. If construction is delayed, we recommend the owner monitor the boring site and backfill any settlement or depression that might occur or provide protection around the area of the boring locations to prevent trip and fall injuries from occurring near the area of any potential settlement.

Environmental Analytical Testing for Soil Sample: One composite soil sample from the excess soil cuttings will be submitted to a California ELAP certified laboratory under chain-of-custody control. All sample analyses will be conducted on a standard turnaround time. The samples will be analyzed as follows:
■ EPA 8015M – TPH carbon chain speciation
■ EPA 8260 – VOCs and Oxygenates
■ EPA 8270 – SVOCs
■ EPA 8082 – PCBs
■ EPA 8081A – OCPs
■ EPA 6010B – Title 22 metals (TTLC)
Waste Disposal: All excess soil cuttings will be contained in five (5) drums. The drums will be temporarily stored on the site away from drainage areas and secured from unauthorized entry until laboratory analytical results are received. The waste will be profiled for the most cost-effective disposal or recycling option. For budgeting purposes, we have assumed five (5) drums of waste will need to be transported and disposed of as non-hazardous waste.

Converse will be responsible for the preparation of waste manifests, and for arranging for proper transportation and disposal of the waste. A Client representative will be responsible for signing the manifests as the Generator. Copies of the manifest will be provided.

Percolation Test: The purpose of the Infiltration test will be to obtain water infiltration rate of the surface soils at the location of surface runoff discharge. We will conduct infiltration testing at one location. The depth of the infiltration test will be at 10.0 feet bgs. A 2-inch diameter perforated PVC pipe will be installed inside the City Council 17 – 33 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 11 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 boring. The pipe will be secured in the borehole and pea gravel filter pack will be poured down the borehole to surround the pipe casing and hole bottom. Water will be added to the borehole until the water level is as near the ground surface as can be achieved and allowed to pre-soak Pre-Soaking: Pre-soaking will be done by inundating the borehole with water for at least one hour.

Test Procedure: After presoak, the borehole will be filled with water to 12 inches above the bottom and the drop in water level in the borehole shall be observed. The following 2 conditions are utilized to determine the time interval between readings.
■ If water remains in the hole after 10 minutes but drains before 30 minutes, the time interval between readings shall be 10 minutes.
■ If water remains in the hole after 30 minutes, the time interval between readings shall be 30 minutes.

After completion of presoak, the borehole shall be inundated to a level less than or equal to the presoak depth.

For each successive infiltration test reading, the starting water level must be at this initial water depth.

A sounder shall be utilized to determine the water level during each test. All measurements of water level shall be taken to the nearest 1/8-inch increment. Infiltration test readings shall be conducted a minimum of eight times, or when a stabilized rate of drop has been obtained, whichever occurs first. A stabilized rate is defined as when the highest and lowest readings of three consecutive infiltration tests are within 10 percent of each other. The average of the stabilized rate over the last 3 consecutive test readings shall be used as the preadjusted infiltration rate.

Attempts will be made to remove the pipe from the borings. If the attempts fail, the pipe will be abandoned in place and the hole backfilled with soil cuttings
Laboratory Testing: Laboratory testing will include, but may not be limited to; In-situ moisture and dry density; Soils corrosivity; R-value; Collapse; Expansion Index; Sieve analysis; Maximum density; and Direct shear.

Engineering Analyses and Report Preparation: Data obtained from the exploratory borings and the laboratory testing program will be evaluated. Engineering analyses will be performed to develop design and construction recommendations that will be presented in a geotechnical investigation report.

I.2 – Horizontal Control Plans
DEA will prepare a 1” = 20’ scale horizontal and vertical control plan for the project depicting a survey control line and dimensions to pertinent site features for use in the layout of the park and site features during construction.

Deliverables: 1” = 20’ scale horizontal and vertical control plan.

I.3 - Grading and Drainage Plan
DEA will prepare a 1”= 20’ scale precise grading, drainage and paving plan for the project depicting grading contours, slopes, finish surface elevations, drainage patterns, swales, typical cross sections, details and proposed civil related improvements including pavement, hardscape flatwork and access ramps. The plan will consider ADA requirements for accessibility.

Deliverables: 1” = 20’ scale grading and drainage plan.

I.4 – Composite Storm Drain and Water Plan
DEA will prepare a 1”= 20’ scale composite storm drain and water plan for the project depicting proposed storm drain and domestic water pipe alignments and structures required to service the project site.

Deliverables: 1” = 20’ scale composite storm drain and domestic water plan.

I.5 - Erosion Control Plan
This plan will include the preparation of erosion control measures for use in construction to reduce sediment transport within the site.

Deliverables: 1” = 20’ erosion control plan as noted above.

I.6 - Final WQMP
DEA will prepare finalize the conceptual WQMP.

Deliverables: Finalized WQMP.

City Council 17 – 34 5/2/2023
12 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 J. Landscape and Irrigation Plans
J.1 – Site / Construction Plan
DEA landscape architects will provide a site plan for the proposed items of construction. This plan will designate features of the proposed project including placement, detail references, material and manufacturer callouts, general construction notes, and specific elements of the overall design which are necessary for the proper construction of proposed items. At this time, we anticipate that the park will include some or all of the amenities noted under 'Public Input'. Please note that we have not included structural calculations for items such as the shade shelter.

Deliverables: 1” = 20’ scale site plan.

J.2 - Planting Plans
Plans will include a plant legend indicating trees, shrubs, and ground covers in addition to information regarding the placement of materials such as decomposed granite, mulch and boulders. The legend will indicate the botanical and common names, quantity, size, and remarks (such as variety and staking procedure). The plans will provide an appropriate palette utilizing sustainable landscape materials including California-friendly, drought tolerant plants.

Deliverables: 1” = 20’ planting plan and details as noted above.

J.3 - Irrigation Plans
The irrigation plans will provide the necessary information for a complete and fully automatic irrigation system for the approximate 1.27 acre park. The plans will indicate the point of connection based upon agency requirements, backflow prevention and pressure regulation (as necessary), and equipment size and type in the irrigation legend. “Smart” Water Application Technologies (SWAT) will be utilized. Flow monitors, moisture sensors, and ET based controllers will be implemented. We also anticipate providing the following information:
■ Prepare water usage calculations (MAWA and ETWU).
■ Provide water efficient landscape worksheet and hydrozone table for each remote control valve. ■ Obtain horticultural soils report (agronomic data) based on soil samples obtained from site. ■ Provide irrigation run time schedule based on soil type. ■ Rain and wind sensors will be added in addition to WUCOLS water use classifications.

Deliverables: 1” = 20’ irrigation plans and details as noted above. (Recycled water is not anticipated).

J.4 - Skate Park Plans (OPTIONAL)
J.4a - Project kick-off meeting
Spohn Ranch and the City will kick-off the project via an in-person or virtual meeting. We will review the project goals, project schedule, and points of coordination.

Deliverables: Meeting Minutes (PDF).

J.4b - Information Gathering & Review
During the project kick-off meeting, Spohn Ranch and the City will take stock of existing site data, studies and any other information pertinent to the project and project site. We will review existing information and work with the City to collect additional information as necessary. The site information typically required to begin design work is as follows:
■ Site survey (AutoCAD).
■ As-built drawings.
■ Geotechnical report.
■ Any master plan design work or future improvements planned for the site. ■ Any local, state or federal design requirements.

City Council 17 – 35 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 13 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 J.4c - Site Walkthrough
Spohn Ranch and the City will conduct a site walkthrough to review existing conditions, photograph the site and discuss opportunities and constraints.

Deliverables: Walkthrough minutes (PDF).

J.4d - 75% Design Development
Incorporating feedback from the project kick-off meeting, Spohn Ranch will prepare a conceptual design.

Conceptual design will address footprint, access, circulation, spacing, elevations and terrain sections, but not detail the specific dimensions of every obstacle.

Deliverables: 3D renderings (jpeg), labeled and scaled 2D site plan (PDF), construction cost estimate (PDF), 2D base (AutoCAD).

J.4e - 75% Design Development Review Meeting
Spohn Ranch will lead a virtual meeting with the City and other relevant stakeholders to present the conceptual design and solicit feedback.

Deliverables: Meeting minutes (PDF).

J.4f - 100% Design Development
Incorporating feedback from the 75% design development review meeting, Spohn Ranch will refine the conceptual design to a 100% design development level.

Deliverables: 3D renderings (jpeg), labeled and scaled 2D site plan (PDF), construction cost estimate (PDF), 2D base (AutoCAD).

J.4g - Construction Documents Kick-off Meeting
Spohn Ranch will lead a virtual meeting with the City to review 100% design development, special requirements and points of coordination.

Deliverables: Meeting Minutes (PDF).

J.4h - 90% Construction Documents
Spohn Ranch will prepare professional construction documents detailing the skatepark-specific site improvements.

Deliverables: (PDF and AutoCAD), information plan, 3D perspective, layout plan, steel plan, jointing plan, grading and drainage plan, sections, construction details and technical specifications.

The City will provide a title block and site base in AutoCAD format. Spohn Ranch will coordinate with the City on other aspects of the construction documents such as access pathways, landscaping, etc.

J.4i - 90% Construction Documents Review Meeting
The City will review the 90% construction documents submittal and prepare redline comments. Spohn Ranch will lead a virtual meeting with the City to review the redline comments and identify actions necessary to address the comments.

Deliverables: Meeting minutes (PDF).

J.4j - 100% Construction Documents
Spohn Ranch will incorporate feedback from the 90% construction documents review meeting and prepare a 100% construction documents submittal sealed by a California-licensed structural engineer.

Deliverables: 100% construction documents (PDF and AutoCAD).

J.5 - Landscape Construction Details
DEA will prepare construction details for hardscape elements, pedestrian bridges, site furnishings (if necessary), planting and irrigation components. In most instances, footing details and calculations (if necessary) for pre-fabricated items such as shade canopies and play equipment will be provided by the manufacturer.

Deliverables: Construction details as noted above.

City Council 17 – 36 5/2/2023
14 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 J.6 - Final Color Rendering
DEA will provide a final color rendering of the project reflecting all items identified within the final construction documents.

Deliverables: 24" x 36" colored rendering as noted above.

K. Electrical Plans
Scope is to provide site security lighting and new electrical service. New service will be coordinated with the local utility company.

Services included:
■ One pre-design site visit as required for verification of existing conditions. ■ Three regularly scheduled coordination conference calls. ■ Electrical specifications provided in book format.
■ Licensed professional engineers stamp and signature.
■ Completion of applicable governing agency comments (plan check comments). ■ Engineering calculations required to generate electrical design. ■ Electrical site plan including the following:

1. Site lighting layout, circuiting, and control wiring diagram for general lighting purposes.

2. Point by point of site lighting foot candle levels.

3. Schedule of lighting fixtures.

4. Energy code lighting compliance forms.

5. New service entrance and main meter sections design.

6. Distribution and branch panel locations.

7. Single line diagram.

8. Load schedules.

9. Panel schedules.

10. Power to irrigation controller.

11. Voltage drop calculations.

12. Electrical connections to low voltage devices as specified by other system designs. ■ Utility Coordination including the following:

1. Electrical utility coordination including the following:
a) Coordination of power service with serving utility.
b) Completion of all paperwork and plan submittals with power company. c) Site meeting with power company.

Deliverables: Electrical engineering plans, details, and specifications as noted above.

L. Plans, Specifications and Estimates (PS&E)
L.1 - Final Construction Documents (plans as described above) The construction documents will be prepared in accordance with the California Building Code and ADA. These plans will be submitted to the City for review and approval at four milestone deliverables - 30% (conceptual as noted above), 60%, 90% and 100%. Plans will be signed by a licensed professional as appropriate.

Constructability review meetings will occur at 90% and shall include the City and DEA. The design team will perform the QAQC efforts and provide those to the City prior to the constructability review. Deliverables during the construction document phase are as follows: Two full sets of the construction documents for review at 90% in addition to one electronic PDF copy in MicroStation CONNECT. At 100% completion, DEA will provide one full sized set of signed and sealed bond copies in addition to one electronic PDF copy (signed final design plans, specifications in Word, QA/QC checklist, cost estimate and design calculations).

Deliverables: Preparation of 60%, 90%, and 100% plans. Fees noted in each of the plan descriptions above.

City Council 17 – 37 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 15 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 L.2 - Technical Specifications
DEA will prepare technical specifications for each of the park components in CSI book format. DEA will combine the specifications with City-provided boiler plate information such as general conditions, special provisions, notice inviting bids etc.

Deliverables: Preparation of technical specifications as noted above.

L.3 – Final Opinion of Probable Cost
The project team will prepare a final construction cost estimate in a per unit basis (or lump sum) of proposed park improvements once the construction documents have been completed to 100%. This format will directly match the contractor bid schedule for ease of comparison. The estimate will be in tabular form for each construction item indicating quantity, unit, unit price and total cost. Although the contractor will be responsible for the preparation of the SWPPP, DEA will include this item in the cost estimate.

Deliverables: Construction cost estimate as noted above.

L.4 - Plan Submittals, Approval Process, and Permitting The construction documents will be prepared in accordance with the California Building Code and ADA.

PS&E's will be submitted to the City for review and approval and will be signed by a licensed professional as appropriate.

Deliverables: Submittal, review, and revisions associated with obtaining project approval as noted above.

BID ADVERTISEMENT, CONSTRUCTION ADMINISTRATION AND RECORD DRAWINGS M.1 – Bid Advertisement (Optional)
DEA will attend the pre-bid meeting and will provide responses to bid RFI’s, assist with answering questions and providing clarification if conflicts arise. Each item will be reviewed by the City prior to release of information.

Deliverables: Attendance at pre-bid meeting and bid assistance as noted above.

M.2 – Construction Administration (Optional)
DEA’s construction management team will answer questions, review submittals, shop drawings and schedules required to be submitted by the contractor for conformance with the design plans and specifications. The DEA team will review and respond to RFI’s and clarifications during construction within five calendar days of receipt.

DEA will complete shop drawing reviews within two weeks of receipt and contract change order reviews shall be completed within two working days of receipt. We understand that the City will handle the day to day construction management process.

DEA has anticipated the hours denoted in the fee schedule for each of the respective disciplines. Please note that this task shall require compensation on a time and materials basis in accordance with the level of effort required / desired. The fees for this task are shown for budgetary purposes only and shall be determined prior to the start of construction to allow the City to decide how best to utilize the DEA team resources along with their own staffing. At this time, it is difficult to determine the level of effort for the tasks listed and therefore we recommend negotiating this task once the contractor has been selected and prior to construction.

M.3 – Record Drawings / As Built Plans (Optional)
Utilizing General Contractor field marked plans provided by the City, DEA will incorporate as built information into the drawing files such that we can provide the City with electronic ‘Record Drawings’.

Deliverables: One set of electronic as built plans based on contractor provided red lines.

City Council 17 – 38 5/2/2023
16 | February 28, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 LEGEND
SITE
BUS
BUS
Existing Tree
Bus Stop
Pedestrian Access
Highly Visible Corner

NORTH GARNSEY
STREET

RESIDENTIAL

OC PUBLIC DEFENDER

PARKING LOT

MULTI-FAMILY
NORTH
WEST 10TH STREET

NORTH FLOWER STREET

RESIDENTIAL
Challenge
Adjacent to high volume street poses challenge for noise, safety and exposure to pollutants.

Solution
Park design will look to create a park border to help reduce these impacts while active play features will be located away from Flower.

A
B Challenge
Park perimeter issues include the Garnsey Street homes and the street itself, street parking, determination of right-of-way, curb and sidewalk conditions.

Solution
DEA will work closely with the City to determine street parking requirements and the impact on park users as well as improving pedestrian site access.

B
B
Challenge
South edge of site is directly adjacent to neighboring parking lot.

Solution
Park design will screen the parking lot, DEA will work with the City to determine if access is needed.

C

RESIDENTIAL

0.3 miles to Storybook Preschool

0.3 miles to Santa Ana Public Library

0.2 miles to Santa Ana Stadium

NEIGHBORHOOD
C
D Challenge
Existing site soil conditions could prevent proper infiltration or bio-filtration.

Solution
These conditions can be solved using proprietary water quality structures similar to those found at other City parks.

D
A

0.5 miles to Santa Ana City Hall

CHALLENGES AND SOLUTIONS
The following diagram depicts our understanding of the challenges associated with this project site. We have developed solutions that DEA will implement to assist the City in delivering a park that includes features requested by the community.

City Council 17 – 39 5/2/2023
David Evans and Associates, Inc. | February 28, 202 | 17 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 2023
March April May June July August September October
10th AND FLOWER PARK PROJECT SCHEDULE
November December

PROJECT INITIATION
Projected Project Award Date/Notice to Proceed

PROJECT STARTUP AND CONCEPTUAL DESIGN
Site Visit/Start Up Meeting with City Staff
Records Research
Topographic Mapping
Base Sheet Preparation
Preliminary Hydrology and Hydraulics Analysis
Utility Coordination
Community Meeting 1 (obtain input from community and City) Prepare Conceptual Plan
Cost Estimate
City Review of Conceptual Plan
Community Meeting 2
PLANS, SPECIFICATIONS AND ESTIMATES (30%) Preliminary Demolition Plans PLANS, SPECIFICATIONS AND ESTIMATES (60%)
PLANS, SPECIFICATIONS AND ESTIMATES (90%)
• Electrical/Lighting Plans and Details
• Preliminary Construction/Site Amenities Plans
• Preliminary Cost Estimate
• Preliminary Layout/Construction Plans and Details
• Irrigation Plans and Details
• Planting Plans and Details
January February
2024
• Title Sheet/General Notes Sheet
• Demolition Plans
• Layout/Construction Plans and Details
• Precise Grading and Drainage Plans
• Water Quality Management Plan
• Construction/Site Amenities Plans
• Skate Park Plans
• Planting Plans and Details
• Irrigation Plans and Details
• Electrical/Lighting Plans and Details
• Cost Estimate
PLANS, SPECIFICATIONS AND ESTIMATES (100%) • Construction/Site Amenities Plans • Skate Park Plans
• Planting Plans and Details
• Irrigation Plans and Details
• Electrical/Lighting Plans and Details
• Construction Details
• Title Sheet/General Notes Sheet
• Demolition Plans
• Layout/Construction Plans and Details
• Precise Grading and Drainage Plans
• Water Quality Management Plan
• On-Site Civil Utility Improvement Plans
• Construction/Site Amenities Plans
• Skate Park Plans
• Planting Plans and Details
• Irrigation Plans and Details
• Electrical/Lighting Plans and Details
• Construction Details
• Title Sheet/General Notes Sheet
• Demolition Plans
• Layout/Construction Plans and Details
• Precise Grading and Drainage Plans
• Water Quality Management Plan
• On-Site Civil Utility Improvement Plans
• Cost Estimate
• Project Specifications/
Bid Schedules
• Final Color Rendering
Geotechnical Investigation and Report
Permitting
City Review
Gather data for environmental analysis Analyze environmental data Revise Conceptual Plan City Approves Conceptual Plan
Draft IS/ MND/ City/ Agency Review
Final IS/ MND/ NOD
Project Schedule
DEA is committed to dedicating the resources needed to complete this park project within the allotted City schedule. Realistic task schedules will be established through close coordination with the City project manager. An emphasis will be placed on making sound project decisions that do not need to be revisited later. Decisions that require stakeholder input will be pursued so that the project stays on schedule. Our proposed schedule is found below.

City Council 17 – 40 5/2/2023
18 | February 28, 202 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 E. Relevant Project Experience
Over the course of more than 46 years, David Evans and Associates, Inc. (DEA) has completed a wide range of projects. We have always endeavored to find the best solutions for our clients, bringing forward innovation and creativity that not only meets our clients’ schedules and budgets, but gives back to the greater community in which our clients operate. The following projects provide a sample of our work and are examples of our relevant experience with park projects within the past five years.

Project Year
Completed Client Name Contact NameNumber Relevance
Standard and McFadden Park, Santa Ana, California: DEA is providing landscape architecture, engineering, and surveying services for Standard - McFadden Park, a two-acre neighborhood park in the city of Santa Ana. DEA was provided a conceptual design of the park by the city and is currently working to prepare final plans and will provide construction administration. The design includes walkways, playground equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be included.

Ongoing City of Santa Ana Gabriel Guerrero
(714) 647-5613
■ City of Santa
Ana
■ Park Design in
underserved
neighborhood
■ Public Outreach
■ Grant Funded
Mariposa Park, Santa Ana, California: DEA provided surveying, engineering, and landscape architectural design for a new half-acre neighborhood park in the City of Santa Ana. The local residents requested that the park include a playground, a teaching area for active lifestyle classes, and a community garden. The design includes walkways, playground equipment, a picnic area, a shade structure, a rock bioswale, California friendly plants (including fruit trees), drip irrigation, low impact development drainage, lighting, and other amenities, including a park entrance sign, interpretive signage, benches, picnic tables, bike racks, and a drinking fountain. 2019 City of Santa Ana Suzi Furjanic
(714) 571-4241
■ City of Santa
Ana
■ Park Design
■ Public Outreach
■ Park Design in
underserved
neighborhood
Various Park Projects, Pasadena, California: Under DEA's current on call contract with the City, DEA and subconsultants have successfully undertaken the following projects:
■ Citywide Park Asset inventory and condition evaluation. Cost estimates for facility replacement. Comprehensive Asset Management Plan including interactive database.
■ Topographic survey and conceptual plans, including estimates, for improvements at Central Park. ■ Plans, specifications and estimates for various improvements at La Pintoresca Park. This scope included community engagement, topographic survey, geotechnical investigation, and civil engineering. ■ Quality control review of civil and landscape plans for the Playhouse District Park and improvements at Lamanda Library Pocket Park.
■ Subconsultant for landscape architecture for the Washington Park Community House Project.

Ongoing City of Pasadena Jeff Khun
(626) 744-4267
■ Municipal Parks
■ Park Design for
Smaller Scale
Projects
■ Public Outreach
/ Community
Workshops
Various Park Projects, Temecula, California: Under DEA's current on call contract with the City, DEA has successfully worked on the following projects:
■ Sam Hicks Monument Park: DEA provided design for improvements consisting of HDPE split-rail and tubular steel fencing, decorative masonry pilasters, tubular steel pedestrian and vehicle gates, in addition to addressing the need to retrofit the existing planting and irrigation systems.
■ Recycled Water Retrofits: DEA has designed two projects for large slope areas and a ten acre park that converted the existing irrigation systems from potable water to recycled water. DEA managed the review and approval of the plans by the local water district.
■ Ronald Reagan Sports Park Pickleball Courts: DEA is currently preparing plans for a large pickleball facility that will include 16 standard pickleball courts and one ADA court, seating and shade shelters, and a 124-stall parking lot. ■ Ronald Reagan Sports Park Roller Hockey Rink Upgrades: DEA is currently preparing plans for a major renovation of an existing roller hockey court. The new improvements include a roof over the entire rink and adjacent seating areas, lighting and ADA upgrades. ■ Michael “Mike” Naggar Park Off Leash Dog Area: DEA prepared plans for a new 2.5 acre off-leash dog park that includes fencing, sidewalks, seating area with shade shelters and a new irrigation system and landscaping. ■ Michael “Mike” Naggar Park Demonstration Garden: DEA is designing a demonstration garden that will replace an existing off leash dog area. This demonstration garden will feature climate adapted drought tolerant plants, pathways, dry streambeds, seating and fencing.

Ongoing City of Temecula Stacy Fox, (951)
694-6411
■ Municipal Park
Projects
■ Water
Conservation
■ Community
Outreach
■ Conceptual
Design
City Council 17 – 41 5/2/2023
David Evans and Associates, Inc. | February 28, 2023 | 19 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 F. References
DEA’s project managers develop long-lasting, sincere, collaborative relationships with their clients. We encourage you to contact the following references for their insight on the professional services of the DEA team.

Project Reference DEA Project Manager
Standard and McFadden Park
City of Santa Ana
Contact: Gabriel Guerrero-Gabany
P: 714.647.5613
E. [email protected]
Heath Habig
Mariposa Park
City of Santa Ana
Contact: Suzi Furjanic
P: 714.571.4241
E. [email protected]
Heath Habig
OCTA Bicycle and Pedestrian Trail
City of Garden Grove
Contact: Paul Guerrero
P: 714.741.5179
E: [email protected]
Heath Habig
Sam Hicks Park
City of Temecula
Contact: Stacy Fox
P: 951.694.6411
E: [email protected]
Todd Holmes
Washington Park
City of Pasadena
Contact: Hayden Melbourn
P: 626.744.4267
E: [email protected]
Todd Holmes
City Council 17 – 42 5/2/2023
David Evans and Associates, Inc. | February 21, 2023 | 1 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124

APPENDIX A

RESUMES
City Council David Evans and Associates, Inc. | February 21, 2023 17 – 43 5/2/2023 2 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Heath Habig, PLA 5028 |
Project Manager
Education
BS, Landscape Architecture, 1996, California State Polytechnic University, Pomona
Registration
Professional Landscape Architect, California (5028), 2005 Years of Experience
27 Heath is a senior landscape architect at DEA with 27 years of landscape architectural design experience
at all phases of the project delivery process including schematic design, design development, construction
documentation and construction support. Heath
has worked on a wide variety of projects during his
career including city parks, streetscapes, single family housing developments, senior living facilities, and
commercial sites. He is also an experienced project
manager having recently managed similar park
projects for the City of Santa Ana.

Standard and McFadden Park, Santa Ana,
California
Heath is serving as project manager for Standard and
McFadden Park, a 2-acre neighborhood park in the
city of Santa Ana. DEA was provided a conceptual
design of the park by the city and is currently
preparing final plans and construction administration
and community outreach. The design includes
walkways, playground equipment, a skatepark, halfcourt basketball, a picnic area, a shade structure, a rock bioswale, California friendly plants, drip irrigation, low impact development drainage and lighting. Other
amenities including a park entrance sign, benches,
picnic tables, bike racks, and drinking fountains will
also be provided. Heath serves as the client contact
and project manager.

Mariposa Park, Santa Ana, California
Heath served as project manager for Mariposa Park,
a one-acre neighborhood park in the City of Santa
Ana. The local residents requested that the park
include a playground, a teaching area for active
lifestyle classes and a community garden. The design
includes walkways, playground equipment, a picnic
area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, interpretive signage, benches,
picnic tables, pedestrian bridge, bike racks, and
drinking fountain were also provided in the design.

Lagos De Moreno Park, Brea, California
DEA provided design and construction services
for Lagos de Moreno Park in the City of Brea. The
park was built adjacent to an elementary school and
included a playground and fitness equipment. Heath
provided full construction support services during
installation. His duties included submittal/request
for information response, preparing clarification
drawings, coordination of construction activities with
the contractor, coordination with Division of the State Architect (DSA), client, and on-site observation. Heath served as the project manager.

Pickleball Courts at Sunrise Park, Palm Springs,
California
DEA prepared conceptual design plans for 16
pickleball courts at Sunrise Park in the City of Palm
Springs. Heath worked closely with City staff to
develop several court layout alternatives which
incorporated existing park features. The designs
also included site furnishings, proposed trees, and
hardscape.

Bicycle and Pedestrian Trail Landscape and
Irrigation Project, Garden Grove, California
DEA landscape architects provided plans,
specifications and construction administration for the
installation of new trees along an existing one mile
stretch of city bike trail which was previously designed by DEA civil engineers. Full irrigation design plans
were also provided by DEA irrigation specialists.

Heath served as the client contact and project
manager.

Lake Cahuilla Veteran's Memorial, La Quinta,
California
DEA landscape architects provided conceptual design
and final construction documents for a new veteran’s
memorial at the main entrance of Lake Cahuilla
Veteran’s Regional Park in the city of La Quinta. The
design incorporated flags with a decorative wall,
memorial plaque and time capsule to commemorate
Riverside County veterans of the five armed service
branches of the US military. An army colonel spoke
at the opening of the memorial. Heath served as the
client contact and project manager.

City Council 17 – 44 5/2/2023
David Evans and Associates, Inc. | February 21, 2023 | 3 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Kim S. Rhodes, PLA 3867
Principal-in-Charge / Quality Assurance/ Quality Control Education
BS, Landscape Architecture, 1985, California Polytechnic State University, Pomona
Registration
Professional Landscape Architect, California (3867), 1993 Years of Experience
38 Kim is a California registered, award-winning
landscape architect, client manager, and vice
president with DEA. For the past 38 years, she has
been responsible for landscape architectural design
and management on numerous projects, including
design and planning for parks, trails, streetscapes /
roadways, sports facilities, transportation corridors,
structure aesthetics, schools and universities,
commercial, residential, and industrial developments.

Standard and McFadden Park, Santa Ana,
California
Kim is serving as principal-in-charge for Standard and
McFadden Park, a 2-acre neighborhood park in the
city of Santa Ana. DEA was provided a conceptual
design of the park by the city and is working to
prepare final plans, construction administration, and
community outreach. The design includes walkways,
playground equipment, a skatepark, half-court
basketball, a picnic area, a shade structure, a rock
bioswale, California friendly plants, drip irrigation, low impact development drainage and lighting. Other
amenities including a park entrance sign, benches,
picnic tables, bike racks, and drinking fountains will
also be provided.

Memory Lane Park, Santa Ana, California
Kim served as principal-in-charge for the awardwinning Memory Lane Park and Trailhead in the City of Santa Ana. The park was designed to provide
recreational opportunities to the area residents,
general public, and bicycle and equestrian riders
along the Santa Ana River Trail. The pocket park
includes a children’s play area, fitness equipment,
nature garden, trails, bike racks, equestrian hitching
posts, picnic area, site furnishings, a dry creek bed
with pedestrian bridge, signage, security lighting and
landscaping.

Mariposa Park, Santa Ana, California
Kim served as principal-in-charge for Mariposa Park,
a one-acre neighborhood park in the City of Santa
Ana. The local residents requested that the park
include a playground, a teaching area for active
lifestyle classes and a community garden. The design
includes walkways, playground equipment, a picnic
area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, interpretive signage, benches,
picnic tables, pedestrian bridge, bike racks, and
drinking fountain were also provided in the design.

The Tracks at Brea, California
As project manager, Kim prepared conceptual and
final construction documents for four miles of Class I
meandering trail through an abandoned rail corridor
in Brea. Segments 2-4 include work between Brea
Boulevard and Birch Street and incorporates both
hard and soft surface trail, native plantings, site
furnishings, a lighted parking area, restroom building, plaza space, community gardens, bioswale, fitness
area and interpretive signage. The site underwent soil
remediation efforts prior to the construction of the trail.

The project was a multiple award winner including an
ASLA Honor Award for design.

Gibson Mariposa Park, El Monte, California
As principal-in-charge, Kim worked with Amigos
de Los Rios, an environmental and community
activist group providing design assistance, project
coordination, and preparation of construction
documents. The park was themed after butterflies;
creating exciting opportunities to integrate unique
design elements into the park. The monument sign
resembled a large caterpillar, the shade canopies
were shaped like large butterflies, and a community
stage was modeled after a caterpillar-eaten leaf.

Plantings were designed for the butterfly habitat,
using only California native plant material.

Bryce E. Hanes Park, San Bernardino, California
Kim served as principal-in-charge for the awardwinning two-acre Bryce E. Hanes Park in San Bernardino. The park is located on a busy corner in
an underserved neighborhood and will include many
of the elements identified throughout the community
input process, such as a water ‘sprayground’, a skate
park, soccer field and open space play, picnic areas,
a basketball court, signage, fitness area, a restroom,
art in public places, and parking. Sustainable features include permeable paving, drought tolerant planting,
solar lighting, ‘Smart’ irrigation techniques, recycled/ recyclable materials and groundwater recharge.

City Council 17 – 45 5/2/2023
4 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Todd Holmes, PLA 3561, PMP
Public Outreach
Education
BS, Landscape Architecture, 1988, California State Polytechnic University, Pomona
Registration
Professional Landscape Architect, California (3561), 1991 Registered Landscape Architect, Nevada (#1070), 2021
Project Management Professional (#1878299), 2015
Years of Experience
35 Todd is a California licensed landscape architect with extensive experience in the public sector throughout
Southern California. For the past 35 years, he has
been responsible for the design and management of
a wide variety of projects including neighborhood and
community parks, trails, campgrounds, streetscapes,
restroom facilities and recreation centers. Todd has
also been involved in significant and successful public outreach efforts during his career.

Standard and McFadden Park, Santa Ana,
California
Todd is providing quality assurance / quality control
for Standard and McFadden Park, a two-acre
neighborhood park in the city of Santa Ana. DEA was
provided a conceptual design of the park by the city
and will work to prepare final plans and construction
administration and community outreach. The
design includes walkways, playground equipment,
a skatepark, half-court basketball, a picnic area, a
shade structure, a rock bioswale, California friendly
plants, drip irrigation, low impact development
drainage and lighting. Other amenities including a
park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be provided.

La Pintoresca Park, Pasadena, California
Under the direction of Todd Holmes, DEA provided
landscape architectural services for the renovation
of La Pintoresca Park in the City of Pasadena. This
project will replace existing facilities and add new
amenities to the park. New features include a splash
pad for water play, new lighting for the skate park and basketball courts, replacement of aged fencing with
new decorative fencing, installation of a new shade
structure over the playground, correcting drainage
problems and court resurfacing. The project also
included community meetings and construction
support.

Robinson Park, Pasadena, California
Todd served as landscape architect for the complete
redesign of Robinson Park, a community park
located in Pasadena. The project was driven by
extensive community engagement and a lengthy
workshop process that resulted in a final design with
strong community support. The project included the
replacement of the existing obsolete community
center with a new multi-purpose recreational facility.

The park was expanded by acquisition of an adjacent
property to allow construction of a new synthetic turf
football and baseball fields, restrooms and parking.

A new playground, picnic area and landscape areas
were also included in the final design.

Washington Park Community House, Pasadena,
California
DEA was a critical part of a multidisciplinary design
team that created plans for a new multipurpose
building in a historic park in the City of Pasadena.

Todd has been engaged in the park design for almost
20 years and was responsible for the development
of the park's master plan, in addition to managing a
major renovation of the park. This project required
extensive community engagement and Todd’s
background with the community played a significant
role in the success of the project. The exterior spaces around the building were designed to be used for
programing that would integrate both interior and
exterior activities. The DEA team developed 3D
graphics to guide the design process and enable the
project stakeholders to visualize the project’s features.

This project required extensive collaboration with the
project’s architect and civil engineer as the site was
constrained and presented several challenges that
had to be overcome to achieve a successful design.

Sam Hicks Park Monument Perimeter Fencing,
Temecula, California
DEA landscape architects prepared construction
documents for Sam Hicks Monument Park located
in downtown Temecula. The construction documents
denoted placement of HDPE split-rail and tubular
steel fencing in addition to addressing the need to
retrofit the existing planting and irrigation systems.

DEA also prepared a final cost estimate and project
specifications. Todd served as project manager.

City Council 17 – 46 5/2/2023
David Evans and Associates, Inc. | February 21, 2023 | 5 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Jon-Sen Oen, CID, CLIA
Senior Irrigation Specialist
Education
BS, Landscape Irrigation Science, 1998, California State Polytechnic University, Pomona
Certification
Certified Irrigation Designer #30459
Certified Landscape Irrigation Auditor #30459, California Los Angeles County Sanitation District Certification – Recycled Water Users Site Supervisor Training Program, 2013
Years of Experience
25 Jon is a certified commercial irrigation designer,
certified landscape irrigation auditor, and a partner
with the U.S. Environmental Protection Agency’s
(EPA’s) WaterSense program. For 25 years, he
has worked on a wide variety of irrigation projects
including parks, streetscapes, interchanges, hotels,
resorts, residential, and commercial developments.

Jon provides construction observation including
submittal review and site visits (main line testing)
specifically focused on irrigation systems and
controls. He is well versed in the regulatory guidelines associated with AB1881 (Model Water Efficient
Landscape Ordinance).

Standard and McFadden Park, Santa Ana,
California
DEA was provided a conceptual design of Standard
and McFadden Park, a 2-acre neighborhood park
in the city of Santa Ana, and is currently working to
prepare final plans and construction administration.

The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be provided. Jon-Sen
provided irrigation design for the park projet.

Mariposa Park, Santa Ana, California
Jon provided landscape irrigation design for Mariposa
Park, a new half-acre neighborhood park in the City
of Santa Ana. The local residents requested that the
park include a playground, a teaching area for active
lifestyle classes, and a community garden. The design
included walkways, playground equipment, a picnic
area, a shade structure, a rock bioswale, California
friendly plans (including fruit trees), drip irrigation, low impact development drainage, lighting, and other
amenities including a park entrance sign, benches,
picnic tables, bike racks, and drinking fountain.

Memory Lane Park, Santa Ana, California
Jon provided irrigation design for the final plans for
the award-winning Memory Lane Park and Trailhead
for the City of Santa Ana. With access to the Santa
Ana River Trail, the pocket park includes a children’s
play area, fitness equipment, nature garden, trails,
bike racks, equestrian hitching posts, picnic area, site furnishings, a dry creek bed with pedestrian bridge,
signage, and security lighting.

Bryce Hanes Park, Riverside, California
Jon provided the irrigation design for the two-acre
Bryce Hanes Park in San Bernardino. The park
is located on a busy corner in an underserved
neighborhood and includes many of the elements
identified throughout the community input process,
such as a water ‘sprayground’, a skate park, soccer
field, open space play, picnic areas, a basketball
court, signage, fitness area, a restroom, art in public places, and parking.

Ovrom Park, Burbank, California
Jon provided irrigation design for a mixed use site in
the City of Burbank that includes a community center
and urban park. This small urban space and the
many uses it provides was the site’s greatest design
challenge. The park includes a basketball court, play
areas, picnic shelters, picnic tables, open turf area,
restroom building and an informal, passive, garden
area.

Marshall Community Park, San Gabriel, California
Jon provided irrigation design for a 2.4-acre park that incorporated sustainable features such as a synthetic
turf sports field, drought tolerant plant material, ‘Smart Irrigation’ equipment for water conservation, and
recycled materials for paving and site furnishings,
while still maintaining state-required standards for
elementary school outdoor play. The site features
include many active amenities such as playground
and picnic areas, walking paths, a baseball/softball
field with soccer field overlay, a basketball court,
a handball court, standard school ground court
activities, and fitness stations. The passive amenities include an educational demonstration garden, picnic
shelters, a restroom, lighting and signage, decorative
fencing, an educational/community history mural wall,
on-street parking and new street frontage landscape.

City Council 17 – 47 5/2/2023
6 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Danny Wang
Senior Landscape Designer
Education
BS, Landscape Architecture, 2006, California State Polytechnic University, Pomona
Registration
Registered Landscape Contractor #897552
Years of Experience
17 Danny is a landscape designer at DEA with 17 years
of experience using AutoCAD, Adobe PhotoShop,
and Adobe Illustrator to assist him in the production
of construction documents. Danny has been involved
in numerous aspects of landscape architecture
including public parks, streetscapes, trails, residential, commercial development, and construction
management.

Standard and McFadden Park, Santa Ana,
California
DEA was provided a conceptual design of Standard
and McFadden Park, a 2-acre neighborhood park
in the city of Santa Ana, and is currently working to
prepare final plans and construction administration.

The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be provided. Danny
provided landscape design.

Memory Lane Park and Trailhead, Santa Ana,
California
Danny assisted with the final design for Memory Lane
Park and Trailhead in the City of Santa Ana. With
access to the Santa Ana River Trail, the pocket park
includes a children’s play area, fitness equipment,
nature garden, trails, bike racks, equestrian hitching
posts, picnic area, site furnishings, a dry creek bed
with pedestrian bridge, signage, security lighting, and landscaping.

Lagos De Moreno Park, Brea, California
Danny assisted with the final design and construction
documents for Lagos De Moreno Park in the City of
Brea, located on the northerly-most end of Laurel
Elementary School. The design was prepared as a
joint-use City/School District project and meets DSA
requirements. Some of the design features included
playground areas for ages 2-5, and 5-12, with shade
sails over the equipment, improvements to the hard
court play area (while protecting and incorporating
existing mature trees), the addition of a new restroom
building, park entrance improvements at three
locations (alley, corner at Flower and Birch, and
access from the school), one new shade structure,
picnic areas, turf play area, planters, fencing
improvements, ADA access / pedestrian circulation,
parking, infrastructure improvements, site furnishings, signage, and park landscaping.

The Tracks at Brea, Segment 3, Brea, California
Danny assisted with the conceptual and final
construction documents for a one mile segment of
Class I meandering trail through an abandoned rail
corridor in Brea. Segment 3 included work between
Brea Boulevard and State College Boulevard, and
incorporates both hard and soft surface trail, native
plantings, site furnishings, and a lighted parking area.

Future uses include a restroom building, splashpad,
plaza space, community gardens, bioswale, fitness
area and interpretive signage. The site underwent soil
remediation efforts prior to the construction of the trail.

Segment 3 is one of six segments planned for the four
-mile trail that traverses from west to east across the city.

Bryce Hanes Park, San Bernardino, California
Danny served as landscape designer for the two
acre Bryce Hanes Park in San Bernardino. The
Proposition 84 park is located on a busy corner in
an underserved neighborhood and includes many
of the elements identified throughout the community
input process, such as a water ‘sprayground’, a skate
park, soccer field and open space play, picnic areas,
a basketball court, signage, fitness area, a restroom,
art in public places, and parking. Sustainable features include permeable paving, drought tolerant planting,
solar lighting, ‘Smart’ irrigation techniques, recycled/ recyclable materials and groundwater recharge.

Ocotillo Park, Cathedral City, California
Danny prepared the design documents, graphics, and
cost estimates for Ocotillo Park. Working closely with
the city appointed grant writer, DEA developed a plan
for active recreation facilities while considering the
incorporation of sustainable features such as recycled
materials, the use of decorative rock and decomposed
granite, 'Smart Irrigation' techniques, and drought
tolerant plant material. The park featured playground
and picnic areas, walking paths, a ball field with
soccer field overlay, parking, plaza space and picnic
shelters, in addition to fitness stations, a restroom,
lighting and signage.

City Council 17 – 48 5/2/2023
David Evans and Associates, Inc. | February 21, 2023 | 7 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Rachel Wells
Landscape Designer
Education
BS, Landscape Architecture, 2019, California State Polytechnic University, Pomona
Years of Experience
4 Rachel Wells has four years of professional
landscape design experience and has worked on
a variety of land development projects ranging
from parks, trails, streetscapes, and demonstration
gardens. Additionally, Rachel has been involved with
the design of several transportation projects ranging
from single interchanges to expansive corridors.

Standard and McFadden Park, Santa Ana,
California
DEA was provided a conceptual design of Standard
and McFadden Park, a 2-acre neighborhood park
in the city of Santa Ana, and is currently working to
prepare final plans and construction administration.

The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be provided. Rachel
provided landscape design.

Mariposa Park, Santa Ana, California
Rachel provided drone imagery for Mariposa Park,
a one-acre neighborhood park in the City of Santa
Ana. The local residents requested that the park
include a playground, a teaching area for active
lifestyle classes and a community garden. The design
includes walkways, playground equipment, a picnic
area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting.

Turf Removal and Demonstration Garden, Palm
Springs, California
DEA landscape architects provided conceptual
design services for turf removal at the Palm Springs
International Airport in California's Coachella Valley.

Rachel is spearheading the design efforts for a
10,000 square foot demonstration garden immediately
outside the main terminal for the airport. This garden
will demonstrate water-saving alternatives to the
traditional turf lawns for home and business owners
alike. Various planting schemes will be demonstrated
in the garden including wildflowers, native plants,
pollination plants, edible plants, cacti, succulents,
spreading groundcovers, and synthetic turf. Inert
materials of gravel and decomposed granite will
delineate pathways for navigation through the garden.

San Sevaine Bike Trail, Fontana, California
Rachel has been assisting DEA's traffic engineers in
the design of the San Sevaine Bike Trail in Fontana,
California. Beginning at Banyan Avenue, this bike
trail project runs southward along the western side
of San Sevaine/Etiwanda Channel for about a mile
and a half. After passing under both the 210 and I-15
freeways and across Victoria Street, the bike trail
ends at the Pacific Electric Bike Trail. Streetscape and pedestrian connectivity improvements along Victoria
Street are also a major part of this project Rachel has been assisting on. Simultaneously, Rachel has been
working on the landscape design of the trailheads
for this project. Close coordination with the cities of Rancho Cucamonga and Fontana were integral to
achieve the desired landscape of native planting, rock
blanket, permanent irrigation, and site amenities like
benches, drinking fountains, and trash receptacles.

Contemplation Garden, Claremont, California
In addition to producing color conceptual plan
graphics, Rachel assisted in the design of a
contemplation garden at Harvey Mudd College in
Claremont, California. DEA landscape architects
worked with Harvey Mudd College to design a
contemplative space for students to relax and unwind
while on campus. The design includes drought
tolerant, California friendly plants, large benches, a
relaxing water feature, and small shade structure.

Morningstar, Mission Viejo, California
Rachel finalized the design and plan processing
efforts for the Morningstar Senior Care Facility in the City of Mission Viejo.

Railroad Canyon Interchange Wall Aesthetics,
Lake Elsinore, California
DEA landscape architects provided conceptual
and final design for the I-15 / Railroad Canyon
Road interchange in the city of Lake Elsinore
which included planting and irrigation throughout
the corridor. The design intent includes permanent
planting in highly visible areas such as at on and off
ramps. Meandering, colorful bands of planting and
decorative hardscape will be installed during roadway
construction. Rachel was involved in the interchange
design and processing efforts for transportation art.

City Council 17 – 49 5/2/2023
8 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Mark Oskorus, PE
Lead Civil Engineer
Education
BS, Civil Engineering, 1996, California State University, Fullerton
Registration
Professional Civil Engineer, California (62159) 2001
Years of Experience
27 Mark has 27 years of experience in the civil
engineering profession. He has successful handson design engineering experience on public works, education, commercial, and residential development
projects. Mark has an extensive background in all
aspects of computer technology as it relates to the
civil engineering profession including grading, street, storm drain, sanitary sewer system, and water design,
in addition to coordination with utility companies for
relocation and installation of new wet and dry utilities.

Standard and McFadden Park, Santa Ana,
California
DEA was provided a conceptual design of Standard
and McFadden Park, a 2-acre neighborhood park
in the city of Santa Ana, and is currently working to
prepare final plans and construction administration.

The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, benches, picnic tables, bike racks, and drinking fountains will also be provided. Mark is
serving as lead civil engineer for this project.

Mariposa Park, Santa Ana, California
Mark served as lead civil engineer for Mariposa
Park, a one-acre neighborhood park in the City of
Santa Ana. The local residents requested that the
park include a playground, a teaching area for active
lifestyle classes and a community garden. The design
includes walkways, playground equipment, a picnic
area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting. Other amenities including a
park entrance sign, interpretive signage, benches,
picnic tables, bike racks, and drinking fountain were
also provided in the design.

Newport Village Park, Newport Beach, California
DEA provided engineering services for this 12-acre,
passive park site including a 120-space parking lot
located behind the Newport Central Library. The site
was contour-graded to maintain park features and
provide ADA pathway from the Library building to
new parking lots and site facilities. Mark provided
engineering support for this project.

Santiago Creek Bike Trail, Orange, California
As project engineer, Mark provided engineering
support for the expansion of an existing regional
bike trail from Tustin Street northerly to its terminus at the City of Villa Park southerly boundary. The trail includes over three miles of asphalt paving and dirt
pathways, two pedestrian bridges crossing Santiago
Creek, and coordination with Caltrans and the County
of Orange for issuance of construction permits within
their jurisdiction. The project was funded through
Federal Transportation Enhancement Activities
program funds, and included the preparation of
technical studies for completion and approval of the
National Environmental Policy Act /The California
Environmental Quality Act (NEPA/CEQA) project
environmental document.

Santa Ana College Central Plant and Infrastructure
/Quad Renovation, Santa Ana, California
Mark led DEA’s team providing civil engineering
and survey services for the proposed Central Plant
building and the campus-wide utility renovation and
quad renovation for Santa Ana College campus. The
project consisted of the demolition of four existing
tennis courts and an existing adjacent facilities
building, the design and construction of a new central
plant building. Additionally, the project included the
demolition and replacement of the campus-wide
sewer, domestic water, fire, and storm drain utilities, including the construction of new utility laterals to all existing buildings. The scope of work also included
the removal and replacement of approximately 5,000
lineal feet of sewer, 6,500 lineal feet of domestic
water, 3,800 lineal feet of fire water systems and
5,000 lineal feet of storm drain. The new storm drain
includes approximately 56,000 cubic feet (419,000
gallons) of overflow storage capacity in the proposed
amphitheater in the event storm events exceed
anticipated flows and the downstream detention
basins become overloaded.

City Council 17 – 50 5/2/2023
David Evans and Associates, Inc. | February 21, 2023 | 9 Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Becka Brien, PE
Civil Engineer
Education
BS, Civil Engineering, 2016, Portland State University
Registration
EIT, Engineer-in-Training, Oregon, 17-249-12, 2017
PE, Professional Engineer, Texas (140829), 2021
Years of Experience
7 Becka is an experienced leader and decision maker
equipped with the finesse to effectively communicate
with a wide variety of personality types. She has
keen ability to troubleshoot and problem-solve in fast
paced environments. Dependable, driven, energetic,
articulate, and highly self-motivated.

Sycamore Hills, Upland, California
Beck assisted with final design including onsite
precise grading and details for the structural walls.

Sycamore Hills will feature an upscale neighborhood
shopping center, amenity complex, county sports
park and plenty of sidewalks and open spaces. DEA's
taks included mapping, survey, final engineering, and
signing plans.

MGA Campus, Los Angeles, California
Becka served as civil designer of the grading and
storm drain utilities for the parking lot along the south side of the project. She also assisted with final onsite grading and coordination of RFI’s. Additionally, Becka
completed and indexed street light plans. DEA master
planned the MGA Campus which is the Valley’s
first live-work-play community, on the under-utilized
24-acre site of a former Los Angeles Times printing
facility in Chatsworth. The anchor tenant is MGA
Entertainment, a consumer entertainment products
company. 24 will be home to MGA’s new corporate
headquarters. Other tenants will offer dining and retail options; the site will also include creative office space and world-class amenities for the residents. The 24
acres will include the 255,000-square-foot existing
building; four new apartment buildings totaling 660
units; 14,000 square feet of retail/dining; a transit
plaza; and extensive, community-oriented green
space. The landscaping will include a dog park,
community gardens, two pool plazas and a sports
park. There will be a walking trail weaving through
the entire perimeter, serving as promenade and an
exercise path. The landscape’s canopy trees, native
shrubs and drought-tolerant grasses connect the
campus to the surrounding natural landscape.

Robyn Katherman, EIT
Engineering Designer
Education
BS, Civil Engineering, 2014, California State University Registration
Engineer-in-Training, CA, 2016
Years of Experience
9 Robyn is an engineer designer with nine years of
experience in land development. She specializes
in residential and commercial developments and
has been involved in everything from planning to
construction. Robyn has experience with grading
plans, erosion control plans, street improvement
plans, utility plans, hydrology/water quality reports,
tentative and final maps, as well as client and City
coordination and permit processing
Standard and McFadden Park, Santa Ana,
California
DEA was provided a conceptual design of Standard
and McFadden Park, a 2-acre neighborhood park
in the city of Santa Ana, and is currently working to
prepare final plans and construction administration.

The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting.

Moreton Place, Glendora, California
An abandoned office building and a warehouse
was converted to 40 single family homes. Provided
grading plans/design, water plans/design, LID/
hydrology reports, storm drain plans, street plans,
sales trailer plans, construction RFI’s, client and city coordination.

Orange Grove, Los Angeles, California
Provided Final Map, rough grading plan, precise
grading plan, LID report, erosion control plan, utility plan, b-permit plan, client and city coordination, and
permit processing services for a new 61 unit 5-story
multi-family building including two levels of sub-grade parking.

Reeves, Los Angeles, California
A new 25 unit 4-story residential hillside development
over 1 level of subterranean parking and a roof deck.

Services provided include Final Map, rough grading
plan, precise grading plan, LID report, erosion control plan, utility plan, b-permit plan, permit processing,
client and city coordination.

City Council 17 – 51 5/2/2023
10 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124 Rebecca Kinney, PE, CFM
Water Quality Engineer
Education
BS, Civil Engineering, California State Polytechnic University, San Luis Obispo, 1995
Registration
Professional Civil Engineer, California (58797), 1999
Certified Floodplain Manager, US-19-11256
Years of Experience
27 Rebecca has 27 years of experience in all phases of
stormwater management projects including planning,
design, and construction. Her recent experience has
focused on development of Master Plans of drainage,
including storm drainage facility sizing, stormwater
NPDES compliance, stream stability, and floodplain
management. Her planning experience includes large
master planned communities, municipal planning, and
supporting hydrologic and stormwater quality analysis
as a basis for CEQA documentation. Rebecca
has prepared Water Quality Management Plans,
Stormwater Pollution Prevention Plans, and CEQA
water quality technical studies. She is experienced in
channel restoration design work including hydrologic
and hydraulic modeling and PS&E work. She has also
served as a regulatory agent for the application of 404 Corps of Engineers, 401 California Regional Water
Quality Control Board, and 1601/1603 California of
Department of Fish and Game permits.

Irvine Regional Park, Orange County, California
Rebecca served as Task Manager and was
responsible for the oversight of the hydrology and
2-dimensional hydraulics for the design of new
storm drain and detention basins to mitigate impacts
associated with flooding from offsite areas and
provide water quality treatment.

Santa Ana Storm Drain Master Plan, Santa Ana,
California
Served as project manager for the update to the City’s
storm drain master plan. The City has an established
drainage system with some segments over 50 years
old and other segments recently constructed. The
project analyzed the main line drainage system and
prepared a hydrology study along with maps for the
entire city boundary and for individual sub-areas
for 2-, 10-, 25-, and 100-year storm events. The
capacity of the existing storm drainage was evaluated
to determine system capacity sufficiency using a
hydrodynamic hydraulic model. A comprehensive list
of needed storm drainage improvements using the
coupled 1D/2D XP-SWMM hydrodynamic model.

On-Call Plan Check of Preliminary and Final Water
Quality Management Plans, Riverside County,
California
Served as technical lead for an On-Call Plan
Check contract that provided assistance for
Hydrology Reports and Water Quality Management
Plan (WQMP) reviews for the Riverside County
Transportation Department (RCTD) both for New
Development and Significant Redevelopment
projects. Tasks included reviewing WQMP submitted
for both public and private developments and projects
within all three of the principal watersheds in the
County to ensure RCTD was in compliance with the
County’s NPDES MS4 Permit.

Rancho Mission Viejo Runoff Master Plans and
Drainage Design, Rancho Mission Viejo, California
Served as project manager for the preparation of
two Runoff Master Plans, the Ranch and Drainage
Facility Design for PA-2 and PA-3, including Cow
Camp Road. The runoff management plans are
an integrated planning document that employs
specialists from traditional and innovative hydrology
and hydraulics, advanced sediment transport, GIS,
and storm water quality. The plan includes complex
hydrology models of the San Juan Creek Watershed,
including Gobernadora Canyon, channel hydraulics
and sediment transport, water quality and regional
flood control basin preliminary design and storm drain
master planning.

City Council 17 – 52 5/2/2023
12 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124

APPENDIX B
FORMS
City Council David Evans and Associates, Inc. | February 21, 2023 17 – 53 5/2/2023 City Council 17 – 54 5/2/2023
City of Santa Ana RFP
Page A3-2
Appendix
ATTACHMENT 3-2: NON-LOBBYING CERTIFICATION

CERTIFICATIONS
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

1. No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.

2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a “Disclosure of Lobbying Activities”.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly.

Firm
Signed and Printed Name:

Title
Date
David Evans and Associates, Inc.

Vice President
2/21/23
Kim S. Rhodes
City Council 17 – 55 5/2/2023
City of Santa Ana RFP
Page A3-3
Appendix
ATTACHMENT 3-3: NON-DISCRIMINATION CERTIFICATION

CERTIFICATIONS
The undersigned consultant or corporate officer (“Consultant”), during the performance of this contract, certifies as follows:

1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.

3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.

6. In the event of the Consultant’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.

7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted City Council 17 – 56 5/2/2023
City of Santa Ana RFP
Page A3-4
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a sub-consultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States.

8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended,
No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.

Signed:

Title:

Firm:

Date:

Vice President
David Evans and Associates, Inc.
2/21/23
City Council 17 – 57 5/2/2023
13 | February 21, 2023 | David Evans and Associates, Inc.

Proposal to provide
Landscape Architectural Design Services for 10th and Flower Park — RFP No. 22-124

APPENDIX C

SUBCONSULTANT'S

COMPREHENSIVE

SCOPE OF WORK
City Council David Evans and Associates, Inc. | February 21, 2023 17 – 58 5/2/2023 2861 Pullman Street ● Santa Ana, CA 92705 ● Tel: (714) 648-0630 ● www.ecorpconsulting.com February 22, 2023
(P23-121)
Kim Rhodes, PLA
Vice President/Landscape Architecture Practice Leader
David Evans and Associates, Inc.

Via email: [email protected]
Subject: Proposal for Environmental Services for the 10th and Flower Park Project, City of Santa Ana, California
Dear Kim:

ECORP Consulting, Inc. (ECORP) is pleased to submit this proposal to provide environmental services for the project mentioned above. This proposal presents ECORP’s proposed technical approach, schedule, and cost to complete these environmental services. We have assumed that DEA will provide the Traffic Impact Analysis for our use in the CEQA document. We have also assumed that the City will provide the Phase I ESA separately.

The project would be subject to the California Environmental Quality Act (CEQA). Based on our experience with parks projects and the resources in the City of Santa Ana, we have assumed that the appropriate environmental document would be an Initial Study/Mitigated Negative Declaration (IS/MND) with supporting technical studies. ECORP’s scope of work, cost, and schedule for these services are provided below.

SCOPE OF WORK
ECORP will prepare the CEQA IS/MND and supporting technical studies for biological resources and cultural resources. Models for air quality/greenhouse gas, noise, and energy will be conducted and the results will be included within the IS/MND with supporting modeling data appended to the IS/MND. ECORP has assumed that the analysis in the technical studies and models will not identify any unavoidable significant impacts, and that an IS/MND will be the appropriate CEQA document.

ECORP will prepare an Administrative Draft, Draft, Administrative Final and Final IS/MND for the project and will prepare and file the Notice of Intent and Notice of Determination with the State Clearinghouse and Orange County Clerk. ECORP will also mail the NOI to up to 20 addresses and arrange for publication in one local newspaper.

ECORP will assist the City with government-to-government consultation with California Native American tribes under Assembly Bill 52 (AB 52) through drafting notification letters and documentation of the consultation process.

City Council 17 – 59 5/2/2023
Kim Rhodes
February 22, 2023

Page 2 of 4 ends

2861 Pullman Street ● Santa Ana, CA 92705 ● Tel: (714) 648-0630 ● www.ecorpconsulting.com

SCHEDULE
We propose to prepare the Administrative Draft IS/MND concurrently with the technical studies to stay on schedule. The technical studies will need to be completed prior to the Draft IS/MND being completed and the start of the 30-day public review period. Please note that delays associated with COVID-19 may occur as it pertains to acquiring cultural records search requests from the South Central Coastal Information Center located at the California State University, Fullerton campus.

Tasks Time Frame for Completion
Task 1 – Air Quality and Greenhouse Gas Emissions Analysis 7 weeks from receipt of requested data Task 2 – Biological Technical Memorandum 7 weeks from receipt of requested data Task 3 – Cultural Resources Inventory 12 weeks from receipt of requested data1 Task 4 – AB 52 Consultation Ongoing, must be completed before Final IS/MND is adopted by the City
Task 5 – Energy Consumption Analysis 7 weeks from receipt of requested data Task 6 – Noise Impact Assessment 7 weeks from receipt of requested data Task 7A – Administrative Draft IS/MND 13 weeks from receipt of project description and completed site plan
City Review 2 weeks
Task 9B – Prepare and Distribute Draft IS/MND and Notices 2 weeks from receipt of City comments Public/Agency Review 30 calendar days
Task 9C – Administrative Final IS/MND, MMRP, and Notice of Determination 3 weeks from end of public review period
City Review 2 weeks
Task 9D –Final IS/MND, MMRP, and Notice of Determination 1 week from receipt of City comments Notice of Determination Filed with the Orange County Clerk within 5 business days of MND adoption
Notes: 1 = Please note that delays associated with COVID-19 may occur as it pertains to acquiring cultural records search requests from the SCCIC. As a result, the schedule of completion of work under this task may be affected. ECORP will keep the Client apprised of any schedule implications as they become known, but will not be held responsible for delays to the project as a result of Information Center closures or delays.

City Council 17 – 60 5/2/2023
Kim Rhodes
February 22, 2023

Page 3 of 4 ends

2861 Pullman Street ● Santa Ana, CA 92705 ● Tel: (714) 648-0630 ● www.ecorpconsulting.com Bidding Assumptions
♦ Schedule estimates are based on our best judgment of the requirements known at the time of the proposal and can be influenced favorably or adversely by Client needs and other circumstances. ECORP will perform the services and accomplish the objectives within the presented costs and schedule. However, if the scope of work or schedule changes, ECORP will offer separate proposals for any out-of-scope work. ♦ ECORP assumes that, by receipt of notice to proceed, full access to the property will be provided by the City, including keys to locked gates and advance notice to existing property tenants of our right of entry.
♦ ECORP shall not be held responsible for work delays or cancellations caused by strikes, accidents, acts of God, delays imposed by the Client, the COVID-19 pandemic, or other delays beyond the control of ECORP.
♦ It is assumed that ECORP can use and rely on the data and information contained in the project related documents provided by the Client. ECORP will not perform a technical review of these documents, and will not be responsible for the content or accuracy of these studies. ♦ This cost is valid for a period of 90 days from the date of this the proposal. Beyond 90 days, ECORP reserves the right to reevaluate the cost.
♦ Expert Witness Testimony, including Depositions, is billed on a time-and-materials basis at time and a half.
♦ ECORP Consulting, Inc. has not been delegated authority under applicable state or federal law to carry out government-to-government consultation with Native American tribes and ECORP cannot guarantee a favorable outcome of tribal consultation. ♦ This scope does not include costs for consultation with regulatory agencies including, but not limited to, the State Historic Preservation Office California Department of Fish and Wildlife, or US Fish and Wildlife Service, or participation by tribal monitors in fieldwork, ♦ The scope and cost assumes one round of comments per version of each document and electronic submittal of documents. We have assumed 5 comment letters on the Draft IS/MND with approximately 4 comments each (approx. 20 comments total). ♦ ECORP Consulting, Inc. assumes that the Project description will not change during the Project. Changes to the Project description may affect cost and schedule.

City Council 17 – 61 5/2/2023
Kim Rhodes
February 22, 2023

Page 4 of 4 ends

2861 Pullman Street ● Santa Ana, CA 92705 ● Tel: (714) 648-0630 ● www.ecorpconsulting.com ♦ Cultural resources location information is exempt from the California Public Records Act and Freedom of Information Act, and therefore, reports that include site location information are considered confidential and are not intended for public distribution. ♦ For costing purposes, ECORP assumes that no cultural resources will be encountered during the field survey. A separate scope and cost will be prepared for recording of any resources and evaluation of eligibility to be included in the California Register of Historical Resources (CRHR) or the National Register of Historic Places (NRHP) based on the level of effort required.

Thank you for the opportunity to submit this proposal. If you have any questions regarding this proposal, please contact me at (909) 304-0046 or via email at [email protected].

Sincerely,
ECORP Consulting, Inc.

Anne Surdzial, AICP
Vice President/Director of CEQA/NEPA Services
City Council 17 – 62 5/2/2023
CONSTRUCTION | MAPPING | GIS | SCANNING | 3D MODELING

Page 1 of 2 ends

6 6 5 6 C a l i e n t e R o a d , S u i t e A | O a k H i l l s, C A 9 2 3 4 4 T e l e p h o n e : 7 6 0 . 2 8 4 . 1 6 7 7 | E m a i l : g r e g @ m e y e r l a n d s u r v e y i n g . c o m 1 ATTN: Mark Oskorus
David Evans and Associates, Inc.
17542 E 17th Street, Suite 150 | Tustin, CA, 92780
Boundary/Topographic Survey – Santa Ana Project- 10th ST & Flower St Meyer Land Surveying thanks you for taking the time to consider our proposal to provide you with a boundary and topographic survey on your property.

SCOPE OF WORK (Recover or set monument corners/Topographical Survey) Survey
• Streets station on 25’O.C
• NG/GS within project limits (25’ grid)
• Locate trees with diameters within project limits
• Locate driveways along Garnsey St
• Locate all above ground structures within project limits • Locate all above ground utilities within project limits • Locate all storm drain inlets within project limits
• Locate Sidewalk drain along Flower St
• Locate Fence on southerly edge of project
• Establish boundary for topography
• Deliver in CAD
• Excludes ROS (if it becomes needed)
• Excludes below ground utility may be done by ASA and CO City Council 17 – 63 5/2/2023
CONSTRUCTION | MAPPING | GIS | SCANNING | 3D MODELING

Page 2 of 2 ends

6 6 5 6 C a l i e n t e R o a d , S u i t e A | O a k H i l l s, C A 9 2 3 4 4 T e l e p h o n e : 7 6 0 . 2 8 4 . 1 6 7 7 | E m a i l : g r e g @ m e y e r l a n d s u r v e y i n g . c o m 2 Assumptions and Exclusions:
• This Proposal Excludes anything not Expressly Stated. • If sufficient monuments are not found per record, additional cost will apply. • Support documents requested from the client may include a Preliminary Title Report, in order that the Topographical Survey depict any easements which may exist on the property and can only be known to Meyer Land Surveying from title documents provided by a client selected Title Insurance Company. The owner of the parcel may have an adequate copy of a Preliminary Title Report or Title Policy acquired during the purchase of the property. • Proposal pricing is good for 90 days from date above. • Does not include Agency fees, including Application or filing fees, which are typically required by the jurisdiction in the case of Corner Record or Record of Survey submittals. (As of the date of this proposal, the County of San Bernardino has a Corner Record submittal fee of $18.00, and a Record of Survey submittal fee of $555.00, to be provided by the client/owner)
• All costs in excess of the proposed amount must be agreed upon by the client prior to the commencement of additional services.

Thank you for taking the time to review our proposal. We always welcome the opportunity to participate in exciting projects and appreciate your invitation to bid.

Sincerely,
Meyer Land Surveying
Office (760) 284-1677
Cell (760) 485-8296
[email protected]
www.meyerlandsurveying.com

City Council 17 – 64 5/2/2023
SPOHN RANCH, INC. | P 626-330-5803 | F 626-330-5503 | W SPOHNRANCH.COM E [email protected] | 6824 S CENTINELA AVE. LOS ANGELES, CA 90230

PROPOSAL FOR DESIGN SERVICES
10TH AND FLOWER PARK – SKATEPARK
DAVID EVANS AND ASSOCIATES, INC. | CITY OF SANTA ANA, CALIFORNIA FEBRUARY 13, 2023
City Council 17 – 65 5/2/2023
EXHIBIT A – SCOPE OF WORK

PROJECT DESCRIPTION
David Evans and Associates, Inc. (Client) in collaboration with the City of Santa Ana seeks professional design services for the development of a concrete skatepark at 10th and Flower Park in Santa Ana, California.

PHASE 1 – DESIGN DEVELOPMENT
Task 1.1 Project Kick-Off Meeting – Spohn Ranch and the Client will kick-off the project via an in-person or virtual meeting. We will review the project goals, project schedule and points of coordination. • Task 1.1 Deliverable
o Meeting Minutes (PDF)
Task 1.2 Information Gathering & Review – During the Project Kick-Off Meeting, Spohn Ranch and the Client will take stock of existing site data, studies and any other information pertinent to the project and project site. We will review existing information and work with the Client to collect additional information as necessary. The site information typically required to begin design work is as follows:
• Site survey (AutoCAD)
• As-built drawings
• Geotechnical report
• Any master plan design work or future improvements planned for the site • Any local, state or federal design requirements
Task 1.3 Site Walkthrough – Spohn Ranch and the Client will conduct a site walkthrough to review existing conditions, photograph the site and discuss opportunities and constraints. • Task 1.3 Deliverable
o Walkthrough Minutes (PDF)
Task 1.4 75% Design Development – Incorporating feedback from the Project Kick-Off Meeting, Spohn Ranch will prepare a conceptual design. Conceptual design will address footprint, access, circulation, spacing, elevations and terrain sections, but not detail the specific dimensions of every obstacle. • Task 1.4 Deliverable
o 3D Renderings (JPEG)
o Labeled & Scaled 2D Site Plan (PDF)
o Construction Cost Estimate (PDF)
o 2D Base (AutoCAD)
Task 1.5 75% Design Development Review Meeting – Spohn Ranch will lead a virtual meeting with the Client and other relevant stakeholders to present the conceptual design and solicit feedback. • Task 1.5 Deliverable
o Meeting Minutes (PDF)
City Council 17 – 66 5/2/2023
Task 1.6 100% Design Development – Incorporating feedback from the 75% Design Development Review Meeting, Spohn Ranch will refine the conceptual design to a 100% Design Development level. • Task 1.6 Deliverable
o 3D Renderings (JPEG)
o Labeled & Scaled 2D Site Plan (PDF)
o Construction Cost Estimate (PDF)
o 2D Base (AutoCAD)
PHASE 2 – CONSTRUCTION DOCUMENTS
Task 2.1 Construction Documents Kick-Off Meeting – Spohn Ranch will lead a virtual meeting with the Client to review 100% Design Development, special requirements and points of coordination. • Task 2.1 Deliverable
o Meeting Minutes (PDF)
Task 2.2 90% Construction Documents – Spohn Ranch will prepare professional construction documents detailing the skatepark-specific site improvements.
• Task 2.2 Deliverable (PDF & AutoCAD)
o Information Plan
o 3D Perspective
o Layout Plan
o Steel Plan
o Jointing Plan
o Grading & Drainage Plan
o Sections
o Construction Details
o Technical Specifications
The Client will provide a title block and site base in AutoCAD format. Spohn Ranch will coordinate with the Client on other aspects of the construction documents such as access pathways, landscaping, etc.

Task 2.3 90% Construction Documents Review Meeting – The Client will review the 90% Construction Documents submittal and prepare redline comments. Spohn Ranch will lead a virtual meeting with the Client to review the redline comments and identify actions necessary to address the comments. • Task 2.3 Deliverable
o Meeting Minutes (PDF)
Task 2.4 100% Construction Documents – Spohn Ranch will incorporate feedback from the 90% Construction Documents Review Meeting and prepare a 100% Construction Documents submittal sealed by a CA-licensed structural engineer.
• Task 2.4 Deliverable
o 100% Construction Documents (PDF & AutoCAD)
City Council 17 – 67 5/2/2023
Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services 3176 Pullman Street, Suite 108, Costa Mesa, California 92626 Telephone: (714) 444-9660 ♦ Facsimile: (714) 444-9640 ♦ www.converseconsultants.com February 16, 2023
Revised: February 21, 2023
Mr. Mark S. Oskorus, PE, QSP
Project Manager, Land Development
David Evans and Associates, Inc.
17782 East 17th Street, Suite 200
Tustin, California 92780
Subject: PROPOSAL TO PREPARE A GEOTECHNICAL INVESTIGATION AND

WATER PERCOLATION TEST REPORT
10th and Flower Park
Southeast corner of 10th Street and Flower Street
City of Santa Ana, Orange County, California
Converse Project No. 23-32-103-00 (01)
Dear Mr. Oskorus:

Converse Consultants (Converse) appreciates the opportunity to be a part of your team to prepare a geotechnical investigation and water percolation test report to assist with the design of the proposed 10th and Flower Park at the above referenced site.

In preparation of this proposal, we performed the following.  Reviewed the Request for Proposals (RFP No. 22-124) for Landscape Architectural Design Services for 10th and Flower Park issued by the City of Santa Ana Public Works Agency, dated January 27, 2023.
 Reviewed the information you transmitted to us via email on February 1, 2023.

SITE/PROJECT DESCRIPTION
The proposed new park at 10th and Flower Streets will be a new 0.65-acre neighborhood park located at the southeast corner of 10th Street and Flower Street, City of Santa Ana, California, just north of Civic Center Blvd. The intent of this park is to provide the local community with access to open space, exercise, and recreation facilities. Based on input from the local community, the project will include, but is not limited to, the following project components:
 Park concept plan
 Playground Area, with rubberized play surface
 Exercise Area
 Canvas shade structures
 Turf play area
 Site lighting (new electrical service)
 Water wise landscaping, with shade trees
 Automated irrigation system (new water service)
 Site Furnishings (benches, bike racks, trash receptacles, drinking fountain, picnic tables)  Park monument sign
 Feasibility study to incorporate Garnsey Avenue ROW into project  Perimeter ROW improvements
 WQMP, as applicable
City Council 17 – 68 5/2/2023
Proposal to Prepare a Geotechnical Investigation Report 10th and Flower Park
Southeast Corner of 10th Street and Flower Street
City of Santa Ana, Orange County, California
February 21, 2023

Page 2 ends

Converse Consultants
R:\2023\32\23-32-103 23-32-103 DEA, 10th and Flower Park, Santa Ana (RFP 22-124) \Proposal/23-32-103_pro(01)parks  Potential features may include A skateboard court, basketball court and pedestrian bridge
 Demolition of Garnsey Avenue
The site is currently comprised of six separate parcels (APN’s 005-142-34, 005-142-35,005- 142-47, 005-142-48, 005-142-49, 005-142-58). The six lots are currently identified as LowDensity Residential (LR-7) land use and zoned Professional (P). They are all currently vacant dirt areas.

SCOPE OF SERVICES
Our scope of work will include the following tasks.

Task 1: Project Set-up
As part of the project set-up, personnel from our office will conduct the following.  Perform a site reconnaissance to verify existing conditions.  Review existing geology/geotechnical reports for properties in the vicinity.  Stake/mark the boring locations in the field so that drill rig access to all the locations is available. In case, the site has existing underground utilities, a representative from the city MUST clear the boring locations, Converse will not be liable for damage to any unmarked utility.
 Notify Underground Service Alert (USA) at least 48 hours prior to field exploration to clear the boring locations of any conflict with existing underground utilities.

Task 2: Subsurface Exploration
Our subsurface exploration will consist of drilling exploratory borings. The purpose of the borings will be to:
 Obtain subsurface information at the site.
 Obtain undisturbed and bulk samples of the various soil types for laboratory testing.  Record depth to bedrock or groundwater (if encountered).

We will drill 6 borings between 5.0 and 30.0 feet below existing ground surface (bgs) within the project site. If refusal is encountered before the planned depths are reached, the borings will be terminated at that depth.

The borings will be drilled with a truck-mounted (CME 75 or equivalent) rig equipped with an 8- inch diameter hollow-stem auger for soil sampling. Relatively undisturbed ring and bulk samples of the subsurface soils will be obtained at frequent intervals in the borings. The undisturbed samples will be obtained with a California Modified Sampler (2.4-inch inside diameter and 3.0- inch outside diameter) lined with thin sample rings. The soil will be retained in brass rings (2.4 inches in diameter and 1.0 inch in height). The central portion of the sample will be retained and carefully sealed in waterproof plastic containers for shipment to our laboratory. Bulk soil samples will be collected in plastic bags and brought to our laboratory. Borings will be backfilled with soil cuttings.

The mechanically driven hammer for the sampler is 140 pounds, falling 30 inches for each blow.

The number of successive drops of the driving weight (“blows”) required for each six inches of penetration will be shown on the boring log.

City Council 17 – 69 5/2/2023
Proposal to Prepare a Geotechnical Investigation Report 10th and Flower Park
Southeast Corner of 10th Street and Flower Street
City of Santa Ana, Orange County, California
February 21, 2023

Page 3 ends

Converse Consultants
R:\2023\32\23-32-103 23-32-103 DEA, 10th and Flower Park, Santa Ana (RFP 22-124) \Proposal/23-32-103_pro(01)parks The borings will be backfilled with cement grout (if ground water is encountered) and soils cuttings and compacted by pushing down with augers. Where asphalt concrete is penetrated, the surface will be patched with cold mixed asphalt concrete. It is possible the surface may settle over time. If construction is delayed, we recommend the owner monitor the boring site and backfill any settlement or depression that might occur or provide protection around the area of the boring locations to prevent trip and fall injuries from occurring near the area of any potential settlement.

Environmental Analytical Testing for Soil Sample
One composite soil sample from the excess soil cuttings will be submitted to a California ELAP certified laboratory under chain-of-custody control. All sample analyses will be conducted on a standard turnaround time. The samples will be analyzed as follows:
 EPA 8015M – TPH carbon chain speciation
 EPA 8260 – VOCs and Oxygenates
 EPA 8270 – SVOCs
 EPA 8082 – PCBs
 EPA 8081A – OCPs
 EPA 6010B – Title 22 metals (TTLC)
Waste Disposal
All excess soil cuttings will be contained in five (5) drums. The drums will be temporarily stored on the site away from drainage areas and secured from unauthorized entry until laboratory analytical results are received. The waste will be profiled for the most cost-effective disposal or recycling option. For budgeting purposes, we have assumed five (5) drums of waste will need to be transported and disposed of as non-hazardous waste.

Converse will be responsible for the preparation of waste manifests, and for arranging for proper transportation and disposal of the waste. A Client representative will be responsible for signing the manifests as the Generator. Copies of the manifest will be provided.

Task 3: Percolation Testing
The purpose of the Infiltration test will be to obtain water infiltration rate of the surface soils at the location of surface runoff discharge.

We will conduct infiltration testing at one location. The depth of the infiltration test will be at 10.0 feet bgs.

A 2-inch diameter perforated PVC pipe will be installed inside the boring. The pipe will be secured in the borehole and pea gravel filter pack will be poured down the borehole to surround the pipe casing and hole bottom. Water will be added to the borehole until the water level is as near the ground surface as can be achieved and allowed to pre-soak.

Pre-Soaking
Pre-soaking will be done by inundating the borehole with water for at least one hour.

City Council 17 – 70 5/2/2023
Proposal to Prepare a Geotechnical Investigation Report 10th and Flower Park
Southeast Corner of 10th Street and Flower Street
City of Santa Ana, Orange County, California
February 21, 2023

Page 4 ends

Converse Consultants
R:\2023\32\23-32-103 23-32-103 DEA, 10th and Flower Park, Santa Ana (RFP 22-124) \Proposal/23-32-103_pro(01)parks Test Procedure
After presoak, the borehole will be filled with water to 12 inches above the bottom and the drop in water level in the borehole shall be observed. The following 2 conditions are utilized to determine the time interval between readings.
 If water remains in the hole after 10 minutes but drains before 30 minutes, the time interval between readings shall be 10 minutes.
 If water remains in the hole after 30 minutes, the time interval between readings shall be 30 minutes.

After completion of presoak, the borehole shall be inundated to a level less than or equal to the presoak depth. For each successive infiltration test reading, the starting water level must be at this initial water depth.

A sounder shall be utilized to determine the water level during each test. All measurements of water level shall be taken to the nearest 1/8-inch increment. Infiltration test readings shall be conducted a minimum of eight times, or when a stabilized rate of drop has been obtained, whichever occurs first. A stabilized rate is defined as when the highest and lowest readings of three consecutive infiltration tests are within 10 percent of each other. The average of the stabilized rate over the last 3 consecutive test readings shall be used as the pre-adjusted infiltration rate.

Attempts will be made to remove the pipe from the borings. If the attempts fail, the pipe will be abandoned in place and the hole backfilled with soil cuttings.

Task 4: Laboratory Testing
Laboratory testing will include, but may not be limited to, the following.  In-situ moisture and dry density
 Soils corrosivity
 R-value
 Collapse
 Expansion Index
 Sieve analysis
 Maximum density
 Direct shear
Task 5: Engineering Analyses and Report Preparation
Data obtained from the borings and the laboratory testing program will be evaluated.

Engineering analyses will be performed to develop design and construction recommendations that will be presented in a geotechnical investigation report. The report will include the following items:
 Project description.
 Site description.
 Discussion on the field procedure used in the investigation.  A discussion of the materials encountered in the borings and their measured engineering properties.
 Logs of the exploratory borings summarizing the subsurface conditions encountered, and a plan indicating the locations of the explorations.

City Council 17 – 71 5/2/2023
Proposal to Prepare a Geotechnical Investigation Report 10th and Flower Park
Southeast Corner of 10th Street and Flower Street
City of Santa Ana, Orange County, California
February 21, 2023

Page 5 ends