Cities Index.
Agenda packet

Santa Barbara City Council
December 10, 2024

Document
Agenda packet
Meeting
December 10, 2024
Body
Santa Barbara City Council
Pages
6
Original file
40.3 MB
Text extracted from the city's file for reading and search. Open the original on docs.santabarbaraca.gov. That file is the official record.

Current Status
The Project was substantially completed on October 25, 2024. The preceding recommendations are the anticipated final Project costs that are required to compensate the contractor and the consultants for additional work from unforeseen conditions including water intrusion issues, framing, and finishes to compensate for existing building conditions and various differing site conditions.

BUDGET/FINANCIAL INFORMATION:

The following table summarizes the total construction phase costs of the Project.

ESTIMATED TOTAL PROJECT CONSTRUCTION COST
**Cents have been rounded to the nearest dollar in this table.

Construction Contract including current Change Order Authority $11,426,525 Requested Construction Change Order Authority 309,718
Construction Management/Inspection 416,337
Current Support Services For Construction (Including LMA) 775,202 Requested Construction Support Services 18,500
Other Construction Costs (testing, etc.) 63,770
Project Total $13,010,052
The Michael Towbes Library Plaza portion of the Project is funded through donations ($2.9M) raised by the Santa Barbara Public Library Foundation. The remainder of the Project is funded primarily by Measure C Capital Funds. With the recommended transfer of existing Measure C appropriations (see Resolution), there will be sufficient expenditure funds to cover the remaining cost of this Project, including the construction contract and the design and construction support service agreements.

A copy of the contract amendments may be requested from the Public Works Department for public review by contacting [email protected].

ENVIRONMENTAL REVIEW:

The Project was determined to be categorically exempt from the California Environmental Quality Act (CEQA). The Project which met the criteria as described under CEQA Guidelines Section 15301, Existing Facilities and the Santa Barbara Municipal Code Chapter 22.100.070.C.1, was determined to result in less than significant environmental effects and is therefore exempt from the provisions of CEQA.

PREPARED BY: Brian D’Amour, P.E., City Engineer/JW/sk
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
RESOLUTION NO. _____

A RESOLUTION OF THE COUNCIL OF THE CITY OF
SANTA BARBARA AMENDING RESOLUTION NO. 24-066,
ADOPTING THE BUDGET FOR FISCAL YEAR 2025, TO

APPROPRIATE FUNDS FOR THE CONSTRUCTION OF

THE CENTRAL LIBRARY RENOVATION PROJECT
WHEREAS, in accordance with the City Charter, the City Administrator filed with the Council a proposed budget for the fiscal year beginning July 1, 2024; WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024;
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 24-066, this Resolution approves the amendment to the budget as provided herein.

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA THAT In accordance with the provisions of Section 1205 of the City Charter, the budget for the Fiscal Year 2025, as adopted by Resolution No. 24-066, is hereby amended as follows:

SECTION 1. The Council approves the transfer of available expenditure appropriations in the Central Library Historic Doors and Tympanum Project in the Measure C Capital Fund in the amount of $171,416.50 and authorizes the transfer of such funds within the Measure C Capital Fund, in Fiscal Year 2025 to fund completion of the Central Library Renovation Project.

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Waterfront Department
SUBJECT: Acceptance of $7,500 From Heal the Ocean [Resolution] RECOMMENDATION:

That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Increase Revenue and Expenditure Appropriations by $7,500 in the Fiscal Year 2025 Waterfront Department Abandoned Vessel Fund for a Donation Received from Heal the Ocean to Incentivize Participation in the Department’s Vessel Turn In Program.

DISCUSSION:

For the past two years, the Waterfront Department and Heal the Ocean have engaged in dialogue regarding new strategies to prevent boats from going aground on City beaches.

Vessels anchored in the open ocean are subject to waves and weather and can be at risk of going aground, especially when unoccupied. These grounded vessels present a public safety and environmental hazard, in addition to costing the City tens of thousands of dollars to remove. In a manner of weeks last winter, costs incurred by the Waterfront Department to remove and abate 3 grounded vessels amounted to over $37,000.

It is significantly less expensive to dispose of a derelict vessel than to dispose of a boat that has gone aground. To increase the likelihood of vessel owners voluntarily turning in their derelict or underutilized vessels, the Waterfront Department will partner with Heal the Ocean on a Vessel Surrender Incentive Program. This program aims to use a small monetary incentive ($500 per vessel) for vessel owners to voluntarily turn in their derelict boats.

The $7,500 donation from Heal the Ocean will enable the Waterfront Department to incentivize boat owners to turn over a vessel before it becomes a problem. Any leftover funds from the donation will be used towards vessel disposal costs of either beached or Agenda Item No. 7
File Code No. 570.03
Council Agenda Report
Acceptance of $7,500 From Heal the Ocean [Resolution]
December 10, 2024

Page 2 ends

turned in vessels. The City will work with Heal the Ocean to promote the program and educate vessel owners of their responsibility to properly dispose of their vessels.

BUDGET/FINANCIAL INFORMATION:

Revenues and appropriations in the Fiscal Year 2025 Waterfront Department Abandoned Vessel Fund will be increased by $7,500 to fund a Vessel Surrender Incentive Program.

PREPARED BY: Nathan Alldredge, Harbor Operations Manager SUBMITTED BY: Mike Wiltshire, Waterfront Director
APPROVED BY: Kelly McAdoo, City Administrator
RESOLUTION NO. _________

A RESOLUTION OF THE COUNCIL OF THE CITY OF SANTA
BARBARA AMENDING RESOLUTION NO. 24-066, ADOPTING
THE BUDGET FOR FISCAL YEAR 2025, TO INCREASE
REVENUE AND EXPENDITURE APPROPRIATIONS BY $7,500 IN
THE FISCAL YEAR 2025 WATERFRONT DEPARTMENT

ABANDONED VESSEL FUND FOR A DONATION RECEIVED

FROM HEAL THE OCEAN TO INCENTIVIZE PARTICIPATION IN
THE DEPARTMENT’S VESSEL TURN IN PROGRAM.

WHEREAS, in accordance with the City Charter, the City Administrator filed with the Council a proposed budget for the fiscal year beginning July 1, 2024; WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024;
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 24-066, this Resolution approves the amendment to the budget as provided herein.

NOW, THEREFORE, be it resolved by the Council of the City of Santa Barbara that in accordance with the provisions of Section 1205 of the City Charter, the budget for the fiscal year 2025, as adopted by Resolution No. 24-066, is hereby amended as follows:

1. The Council approves of the increase in revenue and expenditure appropriation of $7,500 in the Fiscal Year 2025 Waterfront Department Abandoned Vessel Fund budget.

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: City Administrator’s Office
SUBJECT: Certification of Election Results for the General Municipal Election of November 5, 2024 [Resolution]
RECOMMENDATION:

That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Reciting the Fact of the General Municipal Election Held on November 5, 2024, and Declaring the Results and Setting Forth Such Other Matters as Required by State Elections Law.

DISCUSSION:

The General Municipal Election was held on November 5, 2024, for the purpose of electing three Councilmembers as well as submitting a ballot measure to the voters of the City of Santa Barbara. The ballot measure related to the establishment of a general transaction and use (sales) tax (Measure I). The Councilmembers will represent Council Districts 1, 2 and 3, with each Councilmember’s term from this election being four years long.

The Certificate of the Santa Barbara County Clerk-Recorder-Assessor, Registrar of Voters of the Results of the Canvass of the November 5, 2024, City of Santa Barbara General Municipal Election, is attached as an Exhibit to the Resolution.

As provided in the City Charter, the terms of office for Councilmembers-Elect Wendy Santamaria, Mike Jordan, and Oscar Gutierrez will begin on January 7, 2025, the first scheduled meeting in January following certification of election results. A swearing-in ceremony will be held at the City Council meeting on January 7, 2025, where each elected Councilmember will complete their Oath of Office and receive their Certificate of Election, as prescribed in the Constitution of the State of California.

PREPARED AND
SUBMITTED BY: Sarah Gorman, MMC, City Clerk Services Manager APPROVED BY: Kelly McAdoo, City Administrator/City Clerk Agenda Item No. 8
File Code No. 110.03
1 RESOLUTION NO.

A RESOLUTION OF THE COUNCIL OF THE CITY OF SANTA

BARBARA RECITING THE FACT OF THE GENERAL MUNICIPAL
ELECTION HELD ON NOVEMBER 5, 2024, AND DECLARING THE

RESULTS AND SETTING FORTH SUCH OTHER MATTERS AS

REQUIRED BY STATE ELECTIONS LAW
WHEREAS, a General Municipal Election was held and conducted in the City of Santa Barbara, California, on Tuesday, November 5, 2024, per the City Charter and as required by law; WHEREAS, notice of the election was given in time, form and manner as provided by law; voting precincts were properly established; election officers were appointed and in all respects the election was held and conducted and the votes were cast, received and canvassed and returns made and declared in time, form and manner as required by the provisions of the Elections Code of the State of California for holding of elections in charter cities; WHEREAS, by its Resolution Nos. 24-064 and 24-074 adopted on June 11, 2024, the City Council required the Santa Barbara County Clerk-Recorder-Assessor to operate the election for the November 5, 2024, General Municipal Election, including tally and canvass; WHEREAS, the Santa Barbara County Clerk-Recorder-Assessor has completed a canvass of the election returns and submitted to the City the Certification of Election Results of the Official Canvass, and the Certification of Election Results of the Official Canvass is received, attached, and made a part hereof as “Exhibit A”.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA BARBARA DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:

SECTION 1. Pursuant to the requirements of State Elections Code Sections 10264 and 9269 with regard to the results of the City of Santa Barbara’s November 5, 2024, General Municipal Election, the City Council does declare and determine the following:

A. That the whole number of ballots cast in the precincts was 44,511.

B. That the names of persons voted for at the City’s General Municipal Election for Members of City Council are as follows:

District 1 District 2 District 3
Alejandra Gutierrez Mike Jordan Oscar Gutierrez
Wendy Santamaria Terra Taylor Tony Becerra
Cruzito Herrera Cruz
2 C. That the measure voted upon at the election is as follows:

MEASURE I2024
YES Shall the measure maintaining 9-1-1 emergency/fire/paramedic/police response, keeping neighborhood fire stations open; improving housing affordability; addressing homelessness; keeping public areas/parks safe, clean; maintaining library services; stormwater protection; improving natural disaster preparedness; retaining local businesses/jobs, and for general government use; by establishing a ½¢ sales tax providing approximately $15,600,000 annually until ended by voters; requiring audits, public spending disclosure, all funds used locally, be adopted? NO D. That the number of votes given at each precinct and the number of votes given in the City to each of the persons above named for the respective offices for which the persons were candidates were as listed in Exhibit “A” attached.

E. That Wendy Santamaria was elected as Member of the City Council, District 1, for the full term of four years.

F. That Mike Jordan was elected as Member of the City Council, District 2, for the full term of four years.

G. That Oscar Gutierrez was elected as Member of the City Council, District 3, for the full term of four years.

H. That as a result of the election, a majority of voters voting on the measure titled Measure I2024 voted in favor of it, and that the measure was carried, and shall be deemed adopted and ratified.

SECTION 2. The City Clerk, by preserving a copy of this Resolution in the official records for the City, shall enter on the records of the City Council of the City, a statement of the results of the election, showing (1) the total number of ballots cast in the City; (2) The names for the persons voted for; (3) the measures voted upon; (4) For what office each person was voted for; (5) The number of votes given in each precinct to each person; and for and against each measure; and (6) The total number of votes given to each person, and for and against each measure, as required by State Elections Code Section 10264.

SECTION 3. That, as required by State Elections Code Section 10265, the City Clerk shall immediately make and deliver to each of the persons so elected a Certificate of Election signed by the City Clerk and authenticated; that the City Clerk shall also administer to each person elected the Oath of Office prescribed in the Constitution of the State of California and have them subscribe to it and file it in the office of the City Clerk. Each and all of the persons so elected shall then be inducted into the respective office to which they have been elected in the manner and at the time so provided in the City Charter.

SECTION 4. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

EXHIBIT A
Candidate Poll Mail Total
WENDY SANTAMARIA 231 1,867 2,098 46.77%
ALEJANDRA GUTIERREZ 284 1,578 1,862 41.51%
CRUZITO HERRERA CRUZ 121 373 494 11.01%
Write-in 8 24 32 0.71%
Poll Mail Total
Unqualified Write-In WRITE-IN 8 24 32 0.71%
Unresolved Write-In 0 0 0
Poll Mail Total
Times Cast 765 4,306 5,071 / 6,938 73.09%
Precincts Reported: 4 of 4 (100.00%)
City of Santa Barbara Member City Council Dist 1 (Vote for 1) Candidate Poll Mail Total
MIKE JORDAN 383 5,135 5,518 75.91%
TERRA L. TAYLOR 288 1,408 1,696 23.33%
Write-in 7 48 55 0.76%
Poll Mail Total
Unqualified Write-In WRITE-IN 7 48 55 0.76%
Unresolved Write-In 0 0 0
Poll Mail Total
Times Cast 885 7,889 8,774 / 10,335 84.90%
Precincts Reported: 7 of 7 (100.00%)
City of Santa Barbara Member City Council Dist 2 (Vote for 1) Precincts Reported: 288 of 288 (100.00%)
Voters Cast: 187,876 of 244,943 (76.70%)
Cards Cast: 187,876
Election Summary Report
Santa Barbara County Elections
November 5, 2024 Presidential General Election
City of Santa Barbara Certified Results
Elector Group Counting Group Cards Cast Voters Cast Registered Voters Turnout Total Poll 25,159 25,159 10.27%
Mail 162,717 162,717 66.43%
Total 187,876 187,876 244,943 76.70%
Page: 1 of 2

EXHIBIT A
12/4/2024 9:45:55 AM
Candidate Poll Mail Total
OSCAR GUTIERREZ 295 2,218 2,513 56.69%
TONY BECERRA 362 1,542 1,904 42.95%
Write-in 7 9 16 0.36%
Poll Mail Total
Unqualified Write-In WRITE-IN 7 9 16 0.36%
Unresolved Write-In 0 0 0
Poll Mail Total
Times Cast 757 4,123 4,880 / 6,731 72.50%
Precincts Reported: 7 of 7 (100.00%)
City of Santa Barbara Member City Council Dist 3 (Vote for 1) Candidate Poll Mail Total
YES 2,841 22,598 25,439 63.42%
NO 1,323 13,350 14,673 36.58%
Poll Mail Total
Unresolved Write-In 0 0 0
Poll Mail Total
Times Cast 4,777 39,734 44,511 / 54,770 81.27%
Precincts Reported: 50 of 50 (100.00%)
Measure I2024 City of Santa Barbara - City Sales Tax Increase Measure (Vote for 1)
Page: 2 of 2

EXHIBIT A
12/4/2024 9:45:55 AM
Precinct Registered
Voters Voters Cast % Turnout
City
City of Santa Barbara
12-1028
Poll 260 11 4.23%
Mail 260 188 72.31%
Total 260 199 76.54%
12-1029
Poll 449 12 2.67%
Mail 449 369 82.18%
Total 449 381 84.86%
12-1031
Poll 229 5 2.18%
Mail 229 174 75.98%
Total 229 179 78.17%
12-1032
Poll 27 0 0.00%
Mail 27 16 59.26%
Total 27 16 59.26%
12-1033
Poll 148 6 4.05%
Mail 148 127 85.81%
Total 148 133 89.86%
12-1035
Poll 0 0 N/A
Mail 0 0 N/A
Total 0 0 N/A
12-1038
Poll 151 5 3.31%
Mail 151 126 83.44%
Total 151 131 86.75%
Statement of Votes Cast
Santa Barbara County Elections
November 5, 2024 Presidential General Election
City of Santa Barbara Certified Results
Page: 1 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct Registered
Voters Voters Cast % Turnout
12-1400
Poll 2,004 207 10.33%
Mail 2,004 1,208 60.28%
Total 2,004 1,415 70.61%
12-1404
Poll 3,995 471 11.79%
Mail 3,995 2,454 61.43%
Total 3,995 2,925 73.22%
12-1410
Poll 939 87 9.27%
Mail 939 644 68.58%
Total 939 731 77.85%
12-2400
Poll 414 52 12.56%
Mail 414 331 79.95%
Total 414 383 92.51%
12-2402
Poll 425 31 7.29%
Mail 425 337 79.29%
Total 425 368 86.59%
12-3400
Poll 633 127 20.06%
Mail 633 314 49.61%
Total 633 441 69.67%
12-3402
Poll 3,569 398 11.15%
Mail 3,569 2,098 58.78%
Total 3,569 2,496 69.94%
12-3406
Poll 729 61 8.37%
Mail 729 520 71.33%
Total 729 581 79.70%
12-3412
Poll 829 92 11.10%
Mail 829 524 63.21%
Total 829 616 74.31%
Page: 2 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct Registered
Voters Voters Cast % Turnout
12-4404
Poll 258 22 8.53%
Mail 258 205 79.46%
Total 258 227 87.98%
12-4408
Poll 1,034 73 7.06%
Mail 1,034 850 82.21%
Total 1,034 923 89.26%
12-4424
Poll 3,366 224 6.65%
Mail 3,366 2,729 81.08%
Total 3,366 2,953 87.73%
12-4428
Poll 3,791 219 5.78%
Mail 3,791 3,113 82.12%
Total 3,791 3,332 87.89%
12-4430
Poll 366 30 8.20%
Mail 366 277 75.68%
Total 366 307 83.88%
12-4434
Poll 2,777 250 9.00%
Mail 2,777 2,110 75.98%
Total 2,777 2,360 84.98%
12-5404
Poll 631 41 6.50%
Mail 631 483 76.55%
Total 631 524 83.04%
12-5410
Poll 495 17 3.43%
Mail 495 425 85.86%
Total 495 442 89.29%
12-6400
Poll 811 83 10.23%
Mail 811 540 66.58%
Total 811 623 76.82%
Page: 3 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct Registered
Voters Voters Cast % Turnout
12-6402
Poll 1,083 113 10.43%
Mail 1,083 704 65.00%
Total 1,083 817 75.44%
12-6404
Poll 559 52 9.30%
Mail 559 411 73.52%
Total 559 463 82.83%
12-6406
Poll 316 28 8.86%
Mail 316 234 74.05%
Total 316 262 82.91%
12-6410
Poll 282 27 9.57%
Mail 282 184 65.25%
Total 282 211 74.82%
12-6412
Poll 947 106 11.19%
Mail 947 669 70.64%
Total 947 775 81.84%
12-6414
Poll 2,171 221 10.18%
Mail 2,171 1,542 71.03%
Total 2,171 1,763 81.21%
22-2021
Poll00 N/A
Mail00 N/A
Total00 N/A
22-2023
Poll10 0.00%
Mail10 0.00%
Total10 0.00%
22-2028
Poll 327 26 7.95%
Mail 327 198 60.55%
Total 327 224 68.50%
Page: 4 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct Registered
Voters Voters Cast % Turnout
22-2035
Poll 1320 0.00%
Mail 132 114 86.36%
Total 132 114 86.36%
22-2062
Poll 1358 5.93%
Mail 135 92 68.15%
Total 135 100 74.07%
22-2063
Poll 229 19 8.30%
Mail 229 173 75.55%
Total 229 192 83.84%
22-2066
Poll00 N/A
Mail00 N/A
Total00 N/A
22-2400
Poll 396 39 9.85%
Mail 396 284 71.72%
Total 396 323 81.57%
22-2404
Poll 7,089 642 9.06%
Mail 7,089 5,321 75.06%
Total 7,089 5,963 84.12%
22-2416
Poll 1,875 113 6.03%
Mail 1,875 1,524 81.28%
Total 1,875 1,637 87.31%
22-3400
Poll 384 42 10.94%
Mail 384 281 73.18%
Total 384 323 84.11%
22-5400
Poll 2,159 156 7.23%
Mail 2,159 1,682 77.91%
Total 2,159 1,838 85.13%
Page: 5 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct Registered
Voters Voters Cast % Turnout
22-5402
Poll 2,199 138 6.28%
Mail 2,199 1,785 81.17%
Total 2,199 1,923 87.45%
22-5406
Poll 897 67 7.47%
Mail 897 686 76.48%
Total 897 753 83.95%
22-5408
Poll 1,088 92 8.46%
Mail 1,088 693 63.69%
Total 1,088 785 72.15%
22-5410
Poll 1,180 71 6.02%
Mail 1,180 904 76.61%
Total 1,180 975 82.63%
22-5412
Poll 702 71 10.11%
Mail 702 482 68.66%
Total 702 553 78.77%
22-6400
Poll 2,288 222 9.70%
Mail 2,288 1,608 70.28%
Total 2,288 1,830 79.98%
32-3086
Poll10 0.00%
Mail11 100.00%
Total11 100.00%
City of Santa Barbara - Total 54,770 44,511 81.27%
City - Total 54,770 44,511 81.27%
Poll 54,770 4,777 8.72%
Mail 54,770 39,734 72.55%
Page: 6 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
City of Santa Barbara Member City Council Dist 1 (Vote for 1) Precinct
Times CastRegistered Voters
City
City of Santa Barbara
12-1400
Poll 207 2,004
Mail 1,208 2,004
Total 1,415 2,004
12-1404
Poll 471 3,995
Mail 2,454 3,995
Total 2,925 3,995
12-1410
Poll 87 939
Mail 644 939
Total 731 939
22-2021
Poll 0 0
Mail 0 0
Total 0 0
City of Santa Barbara - Total 5,071 6,938
City - Total 5,071 6,938
Precinct

CRUZITO HERRERA CRUZALEJANDRA GUTIERREZ
City
City of Santa Barbara
12-1400
Poll 30 18.18% 66 40.00%
Mail 114 11.01% 427 41.26%
Total 144 12.00% 493 41.08%
12-1404
Poll 82 20.20% 180 44.33%
Mail 200 8.91% 900 40.11%
Total 282 10.64% 1,080 40.75%
12-1410
Poll 9 12.33% 38 52.05%
Mail 59 10.48% 251 44.58%
Total 68 10.69% 289 45.44%
22-2021
Poll 0 0
Mail 0 0
Total 0 0
City of Santa Barbara - Total 494 11.01% 1,862 41.51%
City - Total 494 11.01% 1,862 41.51%
Page: 7 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
WENDY SANTAMARIAWrite-inUnqualified WriteInQualified Write In City
City of Santa Barbara
12-1400
Poll 67 40.61%2 1.21%2 1.21%
Mail 487 47.05%7 0.68%7 0.68%
Total 554 46.17%9 0.75%9 0.75%
12-1404
Poll 140 34.48%4 0.99%4 0.99%
Mail 1,132 50.45% 12 0.53% 12 0.53%
Total 1,272 48.00% 16 0.60% 16 0.60%
12-1410
Poll 24 32.88%2 2.74%2 2.74%
Mail 248 44.05%5 0.89%5 0.89%
Total 272 42.77%7 1.10%7 1.10%
22-2021
Poll000
Mail000
Total000
City of Santa Barbara - Total 2,098 46.77% 32 0.71% 32 0.71% City - Total 2,098 46.77% 32 0.71% 32 0.71%
Page: 8 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
City of Santa Barbara Member City Council Dist 2 (Vote for 1) Precinct
Times CastRegistered Voters
City
City of Santa Barbara
12-2400
Poll 52 414
Mail 331 414
Total 383 414
12-2402
Poll 31 425
Mail 337 425
Total 368 425
22-2023
Poll 0 1
Mail 0 1
Total 0 1
22-2062
Poll 8 135
Mail 92 135
Total 100 135
22-2400
Poll 39 396
Mail 284 396
Total 323 396
22-2404
Poll 642 7,089
Mail 5,321 7,089
Total 5,963 7,089
22-2416
Poll 113 1,875
Mail 1,524 1,875
Total 1,637 1,875
Precinct
TERRA L. TAYLORMIKE JORDAN
City
City of Santa Barbara
12-2400
Poll 15 38.46% 24 61.54%
Mail 58 21.64% 207 77.24%
Total 73 23.78% 231 75.24%
12-2402
Poll 9 33.33% 18 66.67%
Mail 65 22.81% 217 76.14%
Total 74 23.72% 235 75.32%
22-2023
Poll 0 0
Mail 0 0
Total 0 0
22-2062
Poll 2 40.00% 3 60.00%
Mail 24 32.43% 48 64.86%
Total 26 32.91% 51 64.56%
22-2400
Poll 19 61.29% 11 35.48%
Mail 57 24.68% 170 73.59%
Total 76 29.01% 181 69.08%
22-2404
Poll 198 40.24% 288 58.54%
Mail 947 21.37% 3,460 78.07%
Total 1,145 23.25% 3,748 76.12%
22-2416
Poll 45 53.57% 39 46.43%
Mail 257 19.75% 1,033 79.40%
Total 302 21.81% 1,072 77.40%
Page: 9 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Write-inUnqualified WriteInQualified Write In
City
City of Santa Barbara
12-2400
Poll0 0.00%0 0.00%
Mail3 1.12%3 1.12%
Total3 0.98%3 0.98%
12-2402
Poll0 0.00%0 0.00%
Mail3 1.05%3 1.05%
Total3 0.96%3 0.96%
22-2023
Poll00
Mail00
Total00
22-2062
Poll0 0.00%0 0.00%
Mail2 2.70%2 2.70%
Total2 2.53%2 2.53%
22-2400
Poll1 3.23%1 3.23%
Mail4 1.73%4 1.73%
Total5 1.91%5 1.91%
22-2404
Poll6 1.22%6 1.22%
Mail 25 0.56% 25 0.56%
Total 31 0.63% 31 0.63%
22-2416
Poll0 0.00%0 0.00%
Mail 11 0.85% 11 0.85%
Total 11 0.79% 11 0.79%
Page: 10 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
City of Santa Barbara - Total 8,774 10,335
City - Total 8,774 10,335
Precinct
TERRA L. TAYLORMIKE JORDAN
City of Santa Barbara - Total 1,696 23.33% 5,518 75.91% City - Total 1,696 23.33% 5,518 75.91%
Page: 11 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Write-inUnqualified WriteInQualified Write In
City of Santa Barbara - Total 55 0.76% 55 0.76%
City - Total 55 0.76% 55 0.76%
Page: 12 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
City of Santa Barbara Member City Council Dist 3 (Vote for 1) Precinct
Times CastRegistered Voters
City
City of Santa Barbara
12-1028
Poll 11 260
Mail 188 260
Total 199 260
12-3400
Poll 127 633
Mail 314 633
Total 441 633
12-3402
Poll 398 3,569
Mail 2,098 3,569
Total 2,496 3,569
12-3406
Poll 61 729
Mail 520 729
Total 581 729
12-3412
Poll 92 829
Mail 524 829
Total 616 829
22-2028
Poll 26 327
Mail 198 327
Total 224 327
22-3400
Poll 42 384
Mail 281 384
Total 323 384
Precinct

OSCAR GUTIERREZTONY BECERRA
City
City of Santa Barbara
12-1028
Poll 3 30.00% 7 70.00%
Mail 98 59.39% 66 40.00%
Total 101 57.71% 73 41.71%
12-3400
Poll 49 46.23% 56 52.83%
Mail 156 57.14% 117 42.86%
Total 205 54.09% 173 45.65%
12-3402
Poll 156 43.09% 204 56.35%
Mail 1,130 58.07% 812 41.73%
Total 1,286 55.72% 1,016 44.02%
12-3406
Poll 24 48.00% 26 52.00%
Mail 283 58.23% 202 41.56%
Total 307 57.28% 228 42.54%
12-3412
Poll 42 50.60% 40 48.19%
Mail 305 65.87% 155 33.48%
Total 347 63.55% 195 35.71%
22-2028
Poll 9 52.94% 7 41.18%
Mail 95 53.67% 82 46.33%
Total 104 53.61% 89 45.88%
22-3400
Poll 12 33.33% 22 61.11%
Mail 151 58.30% 108 41.70%
Total 163 55.25% 130 44.07%
Page: 13 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Write-inUnqualified WriteInQualified Write In
City
City of Santa Barbara
12-1028
Poll0 0.00%0 0.00%
Mail1 0.61%1 0.61%
Total1 0.57%1 0.57%
12-3400
Poll1 0.94%1 0.94%
Mail0 0.00%0 0.00%
Total1 0.26%1 0.26%
12-3402
Poll2 0.55%2 0.55%
Mail4 0.21%4 0.21%
Total6 0.26%6 0.26%
12-3406
Poll0 0.00%0 0.00%
Mail1 0.21%1 0.21%
Total1 0.19%1 0.19%
12-3412
Poll1 1.20%1 1.20%
Mail3 0.65%3 0.65%
Total4 0.73%4 0.73%
22-2028
Poll1 5.88%1 5.88%
Mail0 0.00%0 0.00%
Total1 0.52%1 0.52%
22-3400
Poll2 5.56%2 5.56%
Mail0 0.00%0 0.00%
Total2 0.68%2 0.68%
Page: 14 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
City of Santa Barbara - Total 4,880 6,731
City - Total 4,880 6,731
Precinct

OSCAR GUTIERREZTONY BECERRA
City of Santa Barbara - Total 2,513 56.69% 1,904 42.95% City - Total 2,513 56.69% 1,904 42.95%
Page: 15 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Write-inUnqualified WriteInQualified Write In
City of Santa Barbara - Total 16 0.36% 16 0.36%
City - Total 16 0.36% 16 0.36%
Page: 16 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Measure I2024 City of Santa Barbara - City Sales Tax Increase Measure (Vote for 1) Precinct
Times CastRegistered Voters
City
City of Santa Barbara
12-1028
Poll 11 260
Mail 188 260
Total 199 260
12-1029
Poll 12 449
Mail 369 449
Total 381 449
12-1031
Poll 5 229
Mail 174 229
Total 179 229
12-1032
Poll 0 27
Mail 16 27
Total 16 27
12-1033
Poll 6 148
Mail 127 148
Total 133 148
12-1035
Poll 0 0
Mail 0 0
Total 0 0
12-1038
Poll 5 151
Mail 126 151
Total 131 151
Precinct
YESNO
City
City of Santa Barbara
12-1028
Poll 10 100.00% 0 0.00%
Mail 113 69.33% 50 30.67%
Total 123 71.10% 50 28.90%
12-1029
Poll 6 75.00% 2 25.00%
Mail 173 55.63% 138 44.37%
Total 179 56.11% 140 43.89%
12-1031
Poll 3 60.00% 2 40.00%
Mail 91 55.49% 73 44.51%
Total 94 55.62% 75 44.38%
12-1032
Poll 0 0
Mail 7 46.67% 8 53.33%
Total 7 46.67% 8 53.33%
12-1033
Poll 3 60.00% 2 40.00%
Mail 62 56.36% 48 43.64%
Total 65 56.52% 50 43.48%
12-1035
Poll 0 0
Mail 0 0
Total 0 0
12-1038
Poll 3 60.00% 2 40.00%
Mail 72 63.16% 42 36.84%
Total 75 63.03% 44 36.97%
Page: 17 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
12-1400
Poll 207 2,004
Mail 1,208 2,004
Total 1,415 2,004
12-1404
Poll 471 3,995
Mail 2,454 3,995
Total 2,925 3,995
12-1410
Poll 87 939
Mail 644 939
Total 731 939
12-2400
Poll 52 414
Mail 331 414
Total 383 414
12-2402
Poll 31 425
Mail 337 425
Total 368 425
12-3400
Poll 127 633
Mail 314 633
Total 441 633
12-3402
Poll 398 3,569
Mail 2,098 3,569
Total 2,496 3,569
12-3406
Poll 61 729
Mail 520 729
Total 581 729
Precinct
YESNO
12-1400
Poll 126 70.00% 54 30.00%
Mail 753 69.40% 332 30.60%
Total 879 69.49% 386 30.51%
12-1404
Poll 329 79.09% 87 20.91%
Mail 1,637 72.63% 617 27.37%
Total 1,966 73.63% 704 26.37%
12-1410
Poll 51 67.11% 25 32.89%
Mail 383 65.14% 205 34.86%
Total 434 65.36% 230 34.64%
12-2400
Poll 32 74.42% 11 25.58%
Mail 187 62.33% 113 37.67%
Total 219 63.85% 124 36.15%
12-2402
Poll 21 77.78%6 22.22%
Mail 212 69.74% 92 30.26%
Total 233 70.39% 98 29.61%
12-3400
Poll 91 85.05% 16 14.95%
Mail 195 68.18% 91 31.82%
Total 286 72.77% 107 27.23%
12-3402
Poll 266 74.51% 91 25.49%
Mail 1,379 70.86% 567 29.14%
Total 1,645 71.43% 658 28.57%
12-3406
Poll 34 68.00% 16 32.00%
Mail 324 67.64% 155 32.36%
Total 358 67.67% 171 32.33%
Page: 18 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
12-3412
Poll 92 829
Mail 524 829
Total 616 829
12-4404
Poll 22 258
Mail 205 258
Total 227 258
12-4408
Poll 73 1,034
Mail 850 1,034
Total 923 1,034
12-4424
Poll 224 3,366
Mail 2,729 3,366
Total 2,953 3,366
12-4428
Poll 219 3,791
Mail 3,113 3,791
Total 3,332 3,791
12-4430
Poll 30 366
Mail 277 366
Total 307 366
12-4434
Poll 250 2,777
Mail 2,110 2,777
Total 2,360 2,777
12-5404
Poll 41 631
Mail 483 631
Total 524 631
Precinct
YESNO
12-3412
Poll 66 75.86% 21 24.14%
Mail 318 67.80% 151 32.20%
Total 384 69.06% 172 30.94%
12-4404
Poll 10 52.63%9 47.37%
Mail 112 62.22% 68 37.78%
Total 122 61.31% 77 38.69%
12-4408
Poll 33 52.38% 30 47.62%
Mail 367 47.85% 400 52.15%
Total 400 48.19% 430 51.81%
12-4424
Poll 98 51.04% 94 48.96%
Mail 1,391 56.61% 1,066 43.39%
Total 1,489 56.21% 1,160 43.79%
12-4428
Poll 113 58.55% 80 41.45%
Mail 1,622 58.60% 1,146 41.40%
Total 1,735 58.60% 1,226 41.40%
12-4430
Poll 20 80.00%5 20.00%
Mail 140 58.33% 100 41.67%
Total 160 60.38% 105 39.62%
12-4434
Poll 148 66.37% 75 33.63%
Mail 1,208 62.95% 711 37.05%
Total 1,356 63.31% 786 36.69%
12-5404
Poll 24 68.57% 11 31.43%
Mail 266 61.15% 169 38.85%
Total 290 61.70% 180 38.30%
Page: 19 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
12-5410
Poll 17 495
Mail 425 495
Total 442 495
12-6400
Poll 83 811
Mail 540 811
Total 623 811
12-6402
Poll 113 1,083
Mail 704 1,083
Total 817 1,083
12-6404
Poll 52 559
Mail 411 559
Total 463 559
12-6406
Poll 28 316
Mail 234 316
Total 262 316
12-6410
Poll 27 282
Mail 184 282
Total 211 282
12-6412
Poll 106 947
Mail 669 947
Total 775 947
12-6414
Poll 221 2,171
Mail 1,542 2,171
Total 1,763 2,171
Precinct
YESNO
12-5410
Poll6 37.50% 10 62.50%
Mail 231 57.61% 170 42.39%
Total 237 56.83% 180 43.17%
12-6400
Poll 52 69.33% 23 30.67%
Mail 339 68.90% 153 31.10%
Total 391 68.96% 176 31.04%
12-6402
Poll 77 77.78% 22 22.22%
Mail 446 70.46% 187 29.54%
Total 523 71.45% 209 28.55%
12-6404
Poll 30 69.77% 13 30.23%
Mail 255 66.58% 128 33.42%
Total 285 66.90% 141 33.10%
12-6406
Poll 15 71.43%6 28.57%
Mail 139 69.15% 62 30.85%
Total 154 69.37% 68 30.63%
12-6410
Poll 17 73.91%6 26.09%
Mail 116 72.96% 43 27.04%
Total 133 73.08% 49 26.92%
12-6412
Poll 71 78.02% 20 21.98%
Mail 420 69.65% 183 30.35%
Total 491 70.75% 203 29.25%
12-6414
Poll 137 73.26% 50 26.74%
Mail 964 70.36% 406 29.64%
Total 1,101 70.71% 456 29.29%
Page: 20 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
22-2021
Poll00
Mail00
Total00
22-2023
Poll01
Mail01
Total01
22-2028
Poll 26 327
Mail 198 327
Total 224 327
22-2035
Poll0 132
Mail 114 132
Total 114 132
22-2062
Poll8 135
Mail 92 135
Total 100 135
22-2063
Poll 19 229
Mail 173 229
Total 192 229
22-2066
Poll00
Mail00
Total00
22-2400
Poll 39 396
Mail 284 396
Total 323 396
Precinct
YESNO
22-2021
Poll00
Mail00
Total00
22-2023
Poll00
Mail00
Total00
22-2028
Poll 14 73.68%5 26.32%
Mail 131 72.38% 50 27.62%
Total 145 72.50% 55 27.50%
22-2035
Poll00
Mail 48 45.28% 58 54.72%
Total 48 45.28% 58 54.72%
22-2062
Poll4 57.14%3 42.86%
Mail 57 70.37% 24 29.63%
Total 61 69.32% 27 30.68%
22-2063
Poll 13 72.22%5 27.78%
Mail 103 63.19% 60 36.81%
Total 116 64.09% 65 35.91%
22-2066
Poll00
Mail00
Total00
22-2400
Poll 27 79.41%7 20.59%
Mail 158 62.70% 94 37.30%
Total 185 64.69% 101 35.31%
Page: 21 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
22-2404
Poll 642 7,089
Mail 5,321 7,089
Total 5,963 7,089
22-2416
Poll 113 1,875
Mail 1,524 1,875
Total 1,637 1,875
22-3400
Poll 42 384
Mail 281 384
Total 323 384
22-5400
Poll 156 2,159
Mail 1,682 2,159
Total 1,838 2,159
22-5402
Poll 138 2,199
Mail 1,785 2,199
Total 1,923 2,199
22-5406
Poll 67 897
Mail 686 897
Total 753 897
22-5408
Poll 92 1,088
Mail 693 1,088
Total 785 1,088
22-5410
Poll 71 1,180
Mail 904 1,180
Total 975 1,180
Precinct
YESNO
22-2404
Poll 345 61.50% 216 38.50%
Mail 2,814 58.50% 1,996 41.50%
Total 3,159 58.82% 2,212 41.18%
22-2416
Poll 59 61.46% 37 38.54%
Mail 812 56.74% 619 43.26%
Total 871 57.04% 656 42.96%
22-3400
Poll 23 57.50% 17 42.50%
Mail 143 55.21% 116 44.79%
Total 166 55.52% 133 44.48%
22-5400
Poll 84 61.31% 53 38.69%
Mail 890 59.37% 609 40.63%
Total 974 59.54% 662 40.46%
22-5402
Poll 74 60.66% 48 39.34%
Mail 945 58.84% 661 41.16%
Total 1,019 58.97% 709 41.03%
22-5406
Poll 34 58.62% 24 41.38%
Mail 406 65.91% 210 34.09%
Total 440 65.28% 234 34.72%
22-5408
Poll 57 72.15% 22 27.85%
Mail 407 65.96% 210 34.04%
Total 464 66.67% 232 33.33%
22-5410
Poll 41 70.69% 17 29.31%
Mail 495 59.28% 340 40.72%
Total 536 60.02% 357 39.98%
Page: 22 of 23

EXHIBIT A
12/4/2024 10:11:58 AM
Precinct
Times CastRegistered Voters
22-5412
Poll 71 702
Mail 482 702
Total 553 702
22-6400
Poll 222 2,288
Mail 1,608 2,288
Total 1,830 2,288
32-3086
Poll 0 1
Mail 1 1
Total 1 1
City of Santa Barbara - Total 44,511 54,770
City - Total 44,511 54,770
Precinct
YESNO
22-5412
Poll 34 56.67% 26 43.33%
Mail 284 64.25% 158 35.75%
Total 318 63.35% 184 36.65%
22-6400
Poll 140 72.16% 54 27.84%
Mail 983 67.65% 470 32.35%
Total 1,123 68.18% 524 31.82%
32-3086
Poll 0 0
Mail 0 0.00% 1 100.00%
Total 0 0.00% 1 100.00%
City of Santa Barbara - Total 25,439 63.42% 14,673 36.58% City - Total 25,439 63.42% 14,673 36.58%
Page: 23 of 23

EXHIBIT A
12/4/2024 10:11:58 AM

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Amendment for the Design Contract for the De La Vina Street Bridge Replacement Project [Agreement]
RECOMMENDATION:

That Council authorize the Public Works Director to execute the Third Amendment to the City Professional Services Agreement No. 25,746-A with Bengal Engineering, Inc., in the amount of $58,671 for engineering design services and authorize the Public Works Director to approve expenditures of up to $20,000 for extra services that may result from necessary changes in the scope of work.

DISCUSSION:

Background
On March 11, 2016, the City received authorization through Caltrans from the Federal Highway Administration (FHWA) to initiate the engineering design phase for the De La Vina bridge replacement project. The De La Vina Street Bridge (Bridge) is currently designated as “structurally deficient,” which indicates a structural inadequacy and elements of the structure are in poor condition. The Bridge is structurally deficient because the deck and superstructure are in poor condition, and the structural evaluation indicates the structure is not suitable for rehabilitation, meaning it requires replacement.

In December 2016, Council authorized the Public Works Director to execute a City Professional Services Agreement with Bengal Engineering, Inc. (Bengal) for design services for the De La Vina Street Bridge Replacement Project (Project) in the amount of $812,242. Bengal was selected to provide design services through a competitive Request for Proposals process that followed strict Caltrans Local Assistance Procedures Manual (LAPM) requirements. Prior contract amendments resulted in a current contract authority of $1,297,146. The Third Amendment to the contract with Bengal is recommended to complete the design phase of the Project.

Project Description
The Project is located on upper De La Vina Street between Alamar Avenue and Vernon Road. According to Caltrans’ records, the Bridge was initially built in 1916 and widened in 1926. The Project will remove and replace the structurally deficient 100-year-old Bridge Agenda Item No. 9
File Code No. 530.04
Council Agenda Report
Amendment for the Design Contract for the De La Vina Street Bridge Replacement Project [Agreement]
December 10, 2024

Page 2 ends

with a new bridge that will meet current seismic, safety, and design standards. This will include realigning roadway approaches, modifying building structures, abating hazardous building materials, relocating utilities including domestic water and sanitary sewer facilities, constructing channel walls, planting landscape materials, creek and habitat restoration, and adding storm water treatment facilities.

Design Consultant Services Amendment
Staff recommends that Council authorize the Public Works Director to execute the Third Amendment to City Professional Services Agreement with Bengal in the amount of $58,671. The unanticipated complexity of the Bridge’s design includes the relocation of thousands of fiber optic cables, multiple revisions to the Bridge section to accommodate utilities, complexity in completion of regulatory permits and bid documents, and Federal Emergency Management Agency support. Staff also recommends authorizing the Public Works Director to approve expenditures of up to $20,000 for extra services that may result from necessary changes in the scope of work.

Community Outreach
Community outreach for the Project was initiated in the conceptual design phase and will continue throughout design and construction. The design was vetted through both an internal and public review process. The Project was reviewed by the Architectural Board of Review and was granted design approval. Hamner Jewel & Associates met with each impacted business owner and property owner, discussed the Project’s direct impacts on their property, and presented offers to each impacted property owner in accordance with the specific right of way needs. Business owner and property owner coordination followed the process outlined by the LAPM. Elements of community outreach will be included in the construction contract, and a robust outreach plan will be implemented prior to and during construction.

Current Project Status
The Project is in the final design phase. Construction is expected to begin in the spring of 2025. Construction will take place over two years to maintain vehicular traffic on De La Vina Street throughout construction.

Council Agenda Report
Amendment for the Design Contract for the De La Vina Street Bridge Replacement Project [Agreement]
December 10, 2024

Page 3 ends

BUDGET/FINANCIAL INFORMATION:

Funding
The following summarizes the expenditures recommended in this report.

DESIGN SERVICES CONTRACT FUNDING SUMMARY
Base
Contract
Extra
Services Total
Original Contract Amount $812,242 $0 $812,242
Previous Contract Amendments $403,680 $81,224 $484,904
Proposed Increase $58,671 $20,000 $78,671
Total $1,274,593 $101,224 $1,375,817
The FHWA has delegated authority to administer the HBP to Caltrans for the State of California. Federal HBP funds will be used to reimburse the City for 88.53 percent of eligible design, right of way, and construction phase costs. City funds are needed for the remaining 11.47 percent of eligible costs and 100 percent of any ineligible items that may be required.

There are sufficient appropriations in the Streets Grant Capital Fund to cover these costs, including the required City match. Additional funds will be appropriated later to cover potential additional right of way capital costs and construction costs. The total cost of the construction phase is approximately $15 million.

ESTIMATED TOTAL PROJECT COST
*Cents have been rounded to the nearest dollar in this table.

Design (Bengal) $1,375,817
City Staff and Environmental Costs $291,226
Design Subtotal $1,667,043
Right of Way Services (Hamner, Jewell) $226,440
Right of Way Services (City Staff Time) $287,217
Right of Way Services (Beacon Integrated Professional) $253,028 Right of Way Capital $3,716,736
Right of Way Subtotal $4,483,421
Construction Subtotal $15,000,000
Project Total $21,150,464
Council Agenda Report
Amendment for the Design Contract for the De La Vina Street Bridge Replacement Project [Agreement]
December 10, 2024

Page 4 ends

ENVIRONMENTAL REVIEW
The Project is subject to environmental regulations under the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). The Project was determined to qualify for exemptions under CEQA Section § 15302 replacement or reconstruction of existing structures and facilities that will have substantially the same purpose and capacity. This determination was made on April 14, 2021, and the State Clearinghouse number is 2024061026. The Project was determined by Caltrans to have no significant impacts on the environment as defined by NEPA. The State determined that the Project is a Categorical Exclusion under 23 Code of Federal Regulations 771.117 Federal Highway Administration (c) (28) for bridge replacement on January 20, 2020.

PREPARED BY: Brian D’Amour, P.E., City Engineer/LY/EG/sk SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Amendment to Contract with IDE Americas for Charles E. Meyer Desalination Plant Operations [Agreement]
RECOMMENDATION:

That Council authorize the Public Works Director to execute Amendment 1 to the Design/Build/Operate Agreement with IDE Americas for the Charles E. Meyer Desalination Plant.

DISCUSSION:

The Charles E. Meyer Desalination Plant (Plant) is an integral part of the City of Santa Barbara’s water supply plan. In 2014, the City issued a Request for Proposals (RFP) to reactivate the Plant. IDE Americas (IDE) proposal scored the highest, and over several months, a Design, Build, Operate (DBO) Contract was negotiated in good faith. In July 2015, the City Council unanimously approved a contract with IDE to design, build and operate the Plant.

The Plant restarted operations in May 2017 with a contracted capacity of 3,125 acre-feet of water per year. The DBO Contract includes an initial five-year operating period and allows for two optional five-year extensions at the City’s discretion.

The operation of the Plant has encountered several challenges and has been unable to consistently meet the annual contracted water production volume, energy, and chemical guarantees. There have also been operational issues associated with high staff turnover and permit violations. IDE and the City disagree about the underlying causes of the Plant’s challenges. The City and IDE entered into a Tolling Agreement to preserve all disputed claims for future resolution.

IDE has communicated through its annual financial reports that it has been consistently operating at a loss year-over-year, which it asserts has limited its ability to be successful under the existing DBO Contract terms. The DBO Contract was negotiated in good faith with provisions to adjust for market inflation. However, IDE underestimated the cost of operating the Plant, which directly contributed to its financial position.

Agenda Item No. 10
File Code No. 540.1
Council Agenda Report
Amendment to Contract with IDE Americas for Charles E. Meyer Desalination Plant Operations [Agreement]
December 10, 2024

Page 2 ends

To support IDE in improving Plant operations, City staff engaged in extensive negotiations with IDE executives. The primary outcome of negotiations was to adjust key contract terms to improve IDE’s financial position, ensuring they are not operating at a significant structural deficit going forward, in exchange for IDE making necessary investments to improve reliability and performance of the Plant.

The proposed DBO Contract Amendment 1 (Amendment) will increase IDE’s compensation to align with current operating costs, which were verified by staff as being below market-rate. In return, IDE has committed to a strategic plan to immediately begin work improving the Plant’s reliability and efficiency. City staff believe this Amendment provides IDE with the opportunity to demonstrate it can improve the performance of the Plant it was hired to design, build and operate for the benefit of the City’s water supply and customers.

A second amendment is under negotiation with IDE to improve reliability of the offshore pumps. It is anticipated that the second amendment would come before City Council for consideration in early 2025.

BUDGET/FINANCIAL INFORMATION:

This Amendment increases the annual fixed operating costs by $1,871,311 per year, bringing the total to $4,894,079 per year. These additional costs were anticipated in the recently adopted water rates, and the City’s Water Operating fund has sufficient funds to cover these costs. Under the Water Supply Agreement, operating costs for the Desalination Plant are proportionately shared between the City’s Water Operating Fund and the Montecito Water District.

A copy of the contract amendment is available for public review and may be requested from the Public Works Department by contacting [email protected].

ENVIRONMENTAL REVIEW:

The Amendment with IDE Americas for the Charles E. Meyer Desalination Plant Operations does not have any direct or indirect physical changes in the environment; therefore, this amendment falls outside of the definition of a “Project” under California Environmental Quality Act (CEQA) Guidelines § 15378 (b)(5) as administrative activities of governments that will not result in physical changes in the environment are not subject to CEQA environmental review.

WATER COMMISSION RECOMMENDATION:

This item was presented to the Water Commission at its meeting on November 21, 2024, and the Commission voted 5-0-0 in support of staff’s recommendations.

PREPARED BY: Joshua Haggmark, P.E. Water Resources Manager/BR/sjc Council Agenda Report
Amendment to Contract with IDE Americas for Charles E. Meyer Desalination Plant Operations [Agreement]
December 10, 2024

Page 3 ends

SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Marketing and Promotions with Downtown Organization of Santa Barbara, Inc. [Agreement]
RECOMMENDATION:

That Council authorize the Public Works Director to execute a six-month agreement in the amount of $303,800 with Downtown Organization of Santa Barbara, Inc. (doing business as Downtown Santa Barbara) for marketing and promotions from December 1, 2024, through June 30, 2025.

DISCUSSION:

Between 1977 and 2020, the City of Santa Barbara (City) contracted with the Downtown Organization of Santa Barbara, Inc. (DSB) to provide landscape maintenance, sidewalk cleaning, placement of holiday lighting, and general maintenance of the 00-1200 blocks of State Street and many cross streets between Chapala and Anacapa Streets. The primary purpose of the contract was to maintain State Street in an attractive manner to encourage tourists and residents to visit the State Street Plaza (Plaza).

Beginning in Fiscal Year 2021, Downtown Parking assumed responsibility for Plaza maintenance, allowing DSB to focus exclusively on marketing and promotions to stimulate economic activity in Downtown and encourage locals and tourists to patronize Downtown Businesses.

In Fiscal Year 2024, Downtown Santa Barbara focused its efforts on marketing, formation of a Community Business Improvement District (CBID), and State Street Promenade activations. Accomplishments include:
 Securing approval to establish a CBID;
 Hosting numerous State Street activations, including line dancing and salsa nights;  Organizing major one-time events, including the Annual Downtown Awards Breakfast, the Art and Wine Tour, and the Holiday Tree Lighting event;  Convening and facilitating strategic committees and dialogues with property owners, food and beverage businesses, and retail businesses; Agenda Item No. 11
File Code No. 180.02
Council Agenda Report
Marketing and Promotions with Downtown Organization of Santa Barbara, Inc. [Agreement]
December 10, 2024

Page 2 ends

 Participating in the State Street Master Planning process; and  Working to generate support for establishment of a Daytime Navigation Center to provide resources for unhoused individuals and mitigate the impacts of people experiencing homelessness in Downtown.

Plans for Fiscal Year 2025 include continued partnerships with area agencies to support economic growth, advertising campaigns and social media to promote Downtown as a destination, pop-up activities, community events, and State Street activations. For details, please refer to the Attachment.

At the end of Fiscal Year 2024, Downtown property owners voted to establish a CBID, to be called the Downtown Santa Barbara Improvement Association (DSBIA), that, once formed, will assume responsibility for Downtown marketing and programming, in addition to providing additional resources for cleanliness and safety. It is anticipated that the DSB organization will dissolve once the DSBIA is operational and DSB’s resources will be absorbed into the DSBIA. Should DSB dissolve prior to the start of Fiscal Year 2026, this agreement will transfer to DSBIA as the successor organization.

BUDGET/FINANCIAL INFORMATION:

Funding for the marketing and promotions agreement in the amount of $303,800 is included as a General Fund transfer to the Public Works Downtown Parking Fund budget for Fiscal Year 2025. The amount of this contract is intended to support DSB marketing and promotional activities for the entirety of Fiscal Year 2025.

ATTACHMENT: Downtown Santa Barbara Plans for Fiscal Year 2024-2025 PREPARED BY: Sarah Clark, Downtown Team Manager/nv
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
A Vibrant & Thriving Downtown Santa Barbara
Plans for Fiscal Year 2024-2025
About Downtown Santa Barbara
The Downtown Organization of Santa Barbara, Inc. (DSB) is dedicated to the promotion and enhancement of the Santa Barbara Downtown District for the benefit of its members, Santa Barbara residents and visitors. DSB was first incorporated in 1967 and has served as the collective voice for Downtown Santa Barbara for more than fifty years. Governed by a volunteer Board of Directors and managed by a team of professional staff, DSB has a long history of leading change, organizing community, and building the brand Downtown Santa Barbara. We pride ourselves on providing services that benefit our members every day and we work in an innovative way to leverage our knowledge and partnership for positive collective impact.

FY 2023-2024 Accomplishments and Plans for FY 2024-2025 FY 2023-2024 provided many opportunities for collaboration, connection, and creativity and a new expansive landscape to further the reimagination of the future of downtown.

DSB has been an active participant in listening to the needs of downtown stakeholders and working to build our capacity to continue to be responsive at increasingly higher levels to meet the needs of this moment. We added a significant amount of new programing in the last year and plan to expand on our accomplishments for FY 2024-2025, by growing our partnerships with local organizations to further activate downtown. We look forward to the completion of the Downtown Master Planning process that has potential to reinvigorate downtown for future generations. In June 2024 after a multi-year effort, we were successful in adopting the new Downtown Community Benefit Improvement District that can soon be able assist in adding significant new services ($2.2 million) in the areas of maintenance, security, and promotion to further support our downtown district. This document outlines the Downtown Organization’s plans and focus areas for the time period of July 1, 2024 to June 30, 2025.

Strengthening Strategic Partnerships to Promote Economic Recovery and Growth • Support the growth of new and existing businesses by distributing the resources of local, county, state and federal opportunities via our monthly business update enewsletters

ATTACHMENT
• Partner with area agencies to leverage resources for downtown businesses ie: (e.g., SCORE, WEV, Economic Development Collaborative, Santa Barbara Beautiful, Santa Barbara Foundation, South Coast Chamber of Commerce).
• Continue to partner with area agencies such as SB ACT, City Net, City of Santa Barbara, County of Santa Barbara to support systems to support individuals in need and mitigate the impacts of vagrancy and crime downtown. • Convene and facilitate regular meetings, strategic committees and community dialogues with business and property owners, and residents to order to be responsive to the needs and desires of the diverse stakeholders that live, work and enjoy downtown.
• Host regular educational forums and mixers to support and build community and promotion around the retail community.
• Host regular committee meetings with food and beverage community • Participate on area boards, commissions and city council meetings in order for DSB staff and board members can be engaged and informed and collaborate and advocate for the needs of downtown stakeholders.
• Continue to develop an active group of trained volunteers, interns and board members and business champions to support and assist with these activities. • Work to further expand economic development efforts to ease the path to opening business downtown and filling vacant spaces downtown.
• Continue to work with community partners via the regional action plans (RAP) on homelessness to support a safe and welcoming downtown.
• Host twice annual downtown beautification and clean up days with local volunteers, business and city leaders to build community pride, participation and shared knowledge of DSB’s work.

Marketing and Promotion:
• Continue to stimulate interest in downtown with digital, print and radio advertising and other marketing telling the stories and highlighting downtown business owners • Continue the Downtown Business Spotlight interview series highlighting different businesses every two weeks.
• Promote local businesses via visually stimulating “What’s Happening Downtown” weekly e-newsletter
• Continue the State Street Flag Program featuring over 30+ nonprofits in 52 weeks. • Post daily stories, video and reel highlights of downtown businesses to 48,800 followers, via @DowntownSantaBarbara up up from 32,500 followers on Instagram the year before) and 12,000 via Facebook.
• Continue to partner with social media influencers and designers to extend the reach of DSB’s marketing locally and nationally via engaging videos. Example:
• Promote businesses via various holiday campaigns such as Valentines Day

ATTACHMENT
• Support businesses via grand openings, ribbon cutting ceremony’s and anniversary celebrations
• Offer regular local business “give-a-ways” and promotions that highlight and bring new visibility to downtown businesses
• Showcase itineraries such as a craft brew trail, happy hours and where to shop for locals and visitors to explore the offerings of downtown on our website. • Continue to highlight and enhance the brand of the distinct downtown neighborhoods such this presidio neighborhood highlight with a focus on hidden or lesser-known gems.
• Develop, and distribute the annual Downtown Santa Barbara map and guide highlighting downtown businesses and neighborhoods
• Promote the good work of local homeless service providers via regular highlights of success stories via our e-newsletter and media story pitches. • Continue to update the Downtown online calendar of events via the DSB website • Work with businesses to update their member business page on the DSB website to include photos and descriptions and contact info so locals and visitors can easily find them by business type in our downtown shopping directory.

A Thriving, Vibrant and Welcoming Downtown
• Work in collaboration with city staff and local organizations to allow access for permitted activations in designated downtown locations
• Partner with local performing and visual arts organizations, local event planners and others to stimulate regular pop-up activities, events, art installations and more to create a welcoming and vibrant downtown that draws you back time and time again
• Partner with the Santa Barbara Arts Collaborative to continue Pianos on State Program
• Partner with the Santa Barbara County Office of Arts and Culture and the City of Santa Barbara for regular public art such as tiny libraries and performance offerings Community Events & Activations
• Continue the monthly 1st Thursday Art Walk, featuring 25+ local galleries and businesses, artists and performances throughout downtown. • Promote these events and activities collectively in themes highlighting downtown’s unique diverse neighborhoods and spaces with the goal of enhancing downtown with a plethora of ongoing activities for all ages, including music, youth and familyoriented activities etc. o NEW: DOWNTOWN NEIGHBORHOOD OPEN HOUSES: Host regular events to highlight the unique attributes and offerings of each downtown neighborhood block

ATTACHMENT
o SUMMER MUSIC SERIES, a weekly Wednesday music series on the 700 block of State Street featuring local musicians in partnership with the shops and restaurants on the block in June and July
o DOWNTOWN DANCE CLASSES! Free community salsa dance classes; 2nd Sundays in July, August and September, plus every Wednesday evening in October. Country line dance classes are scheduled for every Wednesday the month of September.
o JOB FAIR: Collaborate with area agencies to host a Job Fair on State Street, This year’s event is scheduled for Wednesday Sept. 25, from 3-5 PM o SHOPTEMBER & SIP AND SHOP: A retail focused marketing campaign the entire month of September culminating in a Sip and Shop Event (Sept. 28) highlighting boutiques, furniture, and design studios.
o ARTOBER: A month-long promotional campaign celebrating art, music, theatre and design related organizations
o DOWNTOWN TRICK OR TREAT: Organize and highlight more than 50 participating businesses and attracting thousands of families HOLIDAY BUSINESS DÉCOR CONTESTS; Promote businesses seasonally via holiday
o DOWNTOWN HOLIDAY PROGRAMMING: Curate and produce programming for a “Downtown Holiday Happenings” calendar of Events November – December + a 15 days of small business promotion
o HOLIDAY TREE LIGHTING CEREMONY AND BLOCK PARTY
o COMMUNITY PARTNER EVENTS: Such as: “Adopt a Dog on State Street” Paseo Nuevo “Spooky Movie Nights” and Sunken Garden Movie Nights Series.

Annual Events
• Organize the ANNUAL DOWNTOWN AWARDS BREAKFAST highlighting the contributions of area businesses and organizations and community leaders • Organize the DOWNTOWN BREW FEST, promoting local craft breweries and stimulating new patrons.
• Organize the ANNUAL LIVE ART AND WINE TOUR highlighting downtown restaurants, wineries, breweries, theatres and galleries. • Support the organizers of many local and visiting events such as Old Spanish Days, Summer Solstice, the Santa Barbara International Film Festival and more to make it easy to have successful offerings by assisting with logistics, offering advice, promotion and coordinate with area businesses where necessary Downtown Santa Barbara to CBID Transition:

Over the next 6 months to a year, the Downtown Organization will be working to develop and launch the new CBID organization alongside the new CBID interim board of directors.

It is anticipated that the majority of the organization’s resources including staff, intellectual property along with its diverse programming will become housed under the new CBID nonprofit organization in 2025 and once complete the downtown organization will

ATTACHMENT
dissolve, creating a new and improved organization that has a greater capacity and budget to service the diverse needs of downtown including the growing needs of security, cleaning and maintenance to lead downtown into the future. We have very much appreciated the continued partnership with the City of Santa Barbara over all these years and look forward to continuing the collaboration with the CBID that will support next 50 years of downtown! Budget
This document is accompanied by a budget that outlines the costs of management, staffing and implementation of these activities. The attached budget of $303,800, which is the same contract amount as FY 23-24 would be supplemented by earned program income, board contributions.

If you have questions or would like more information about these plans, please contact:

Robin Elander
Executive Director
Downtown Santa Barbara
[email protected]
www.downtownsb.org

ATTACHMENT

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Waterfront Department
SUBJECT: Memorandum of Understanding with the Commercial Fishermen of Santa Barbara [Agreement]
RECOMMENDATION:

That Council authorize the Waterfront Director to execute a Memorandum of Understanding with the Commercial Fishermen of Santa Barbara for grant support from December 13, 2024, through December 31, 2028.

DISCUSSION:

The Waterfront Department and the City of Santa Barbara have long supported local commercial fishing efforts in numerous ways. Most recently, the Waterfront has provided funding and staff time in support of the Commercial Fishermen of Santa Barbara’s (CFSB) efforts to identify and develop space for an “Ocean Collective” that would include resources to serve, and grow, the local commercial fishing economy. Over the past several months, CFSB has been successful in their efforts working with Santa Barbara City College (SBCC) to identify space for the Ocean Collective.

To help fund the design and development of this project, the Commercial Fishermen of Santa Barbara (CFSB) recently submitted a letter of interest (LOI) for the State Uplift Catalyst Predevelopment Grant, which was accepted on November 1, 2024. The Catalyst Predevelopment grant is part of the California Jobs First Program that awarded Uplift Central Coast $9M in funding to support community projects and initiatives in the Central Coast region. With the acceptance of the initial LOI, CFSB is now required to submit a full grant application, which is due December 13, 2024. As a means of strengthening CFSB’s grant application and confirming the City of Santa Barbara’s support of CFSB’s efforts, the Memorandum of Understanding (MOU) was created between the City of Santa Barbara and CFSB. The MOU outlines the City’s role in supporting CFSB (primarily through in-kind services and staff support) should the grant funds be awarded.

Agenda Item No. 12
File Code No. 570.03
Council Agenda Report
Memorandum of Understanding with the Commercial Fishermen of Santa Barbara [Agreement]
December 10, 2024

Page 2 ends

BUDGET/FINANCIAL INFORMATION:

Copies of the MOU may be requested from the Waterfront Department for public review by contacting Niko Lopez at [email protected].

PREPARED AND
SUBMITTED BY: Mike Wiltshire, Waterfront Director
APPROVED BY: Kelly McAdoo, City Administrator

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Public Outreach Services for Design of the Vic Trace Reservoir Replacement Project [Agreement]
RECOMMENDATION:

That Council authorize the Public Works Director to execute a City Professional Services Agreement with Katz & Associates, Inc., in the amount of $586,250 for design phase public outreach services for the Vic Trace Reservoir Replacement Project and authorize $58,625 for potential extra services, for a total expenditure authority of $644,875.

DISCUSSION:

Background
The Vic Trace Reservoir (Reservoir) is located at 740 Dolores Drive in the City of Santa Barbara’s (City) Mesa neighborhood. It was constructed in 1956 as part of a partially buried, 10-million-gallon concrete reservoir used for treated drinking water storage and is the City’s largest reservoir. The City identified the Vic Trace Reservoir Replacement Project (Project) as critical in its Water Distribution Infrastructure Plan (WDIP). The WDIP provides strategic guidance and practical recommendations to address the City’s water distribution and water supply needs through the Planning Year 2050. The Reservoir was recommended for replacement due to its age, increasing repair needs, and importance to the City’s overall water storage portfolio.

Project Description
The Project will design and construct two new buried reservoirs totaling the same existing storage capacity and evaluate repair needs at nearby hydraulically connected pipelines, valves, and pump stations. Due to the Project’s large scale, anticipated construction impacts, and surrounding residential neighborhoods, the City engaged with Katz & Associates Inc., (K&A), a communications and outreach consultant, early in the Project’s planning process to begin proactive community outreach and inform the scope of the Project’s design. The first phase of the public outreach included the development of a Strategic Communication Plan, which guided community engagement and input throughout the Project. The Strategic Communication Plan is complete, and it identified Agenda Item No. 13
File Code No. 540.09
Council Agenda Report
Public Outreach Services for Design of the Vic Trace Reservoir Replacement Project [Agreement]
December 10, 2024

Page 2 ends

stakeholders, developed Project messaging, and outlined specific methods of community engagement through each phase of the Project. The second phase of public outreach services is the implementation of the Strategic Communication Plan through design development up to construction.

Current Status
The Project is completing the planning phase and preparing to transition into the design phase. Previous contracts awarded by Council for this Project include:
 Rincon Consultants Inc., (Rincon): initial environmental services, including reports on biology, archeology, and soil conditions awarded on June 13, 2023.  K&A: Phase 1 public outreach services awarded on October 17, 2023.  Kennedy Jenks Consultants Inc., (KJ): preliminary design services awarded on May 14, 2024.
 Rincon: second phase of environmental services awarded on May 14, 2024.

Upcoming Project milestones include selecting and awarding additional contracts for:
 Project Professional Planner services (expected winter 2024/2025);  Final Design (expected spring of 2025); and
 Construction Management and Constructability Review (expected spring of 2026).

Planning and design phase work is expected to take up to three years, followed by the award of a construction contract. Onsite demolition and construction of the two new buried reservoirs would take place for a duration of approximately two years.

Public Outreach Services
Staff recommends that Council authorize the Public Works Director to execute a contract with K&A in the amount of $586,250 for the second phase of outreach services for the Vic Trace Reservoir Replacement Project, and authorize $58,625 for potential extra services, for a total expenditure authority of $644,875. K&A is experienced in this type of work and was selected as part of a competitive Request for Proposals process. They were the most qualified from a total of eight firms that submitted proposals. The selection was made based on K&A’s qualifications to perform the full scope of public outreach services for successful delivery of the Project, including a communication plan development, and public outreach implementation during design and construction.

K&A has successfully completed Phase 1 services on-time and within budget. The contract recommended in this report is for the second phase of outreach services to implement the Strategic Communication Plan during design, which will include activities such as development of outreach materials, facilitating public workshops, updates to Water Commission and Council, contractor outreach, pre-construction community events, school outreach, and a ceremonial groundbreaking event. The first public workshop is anticipated in spring of 2025.

Council Agenda Report
Public Outreach Services for Design of the Vic Trace Reservoir Replacement Project [Agreement]
December 10, 2024

Page 3 ends

BUDGET/FINANCIAL INFORMATION:

There are sufficient expenditure appropriations in the Water Capital Fund in Fiscal Year 2025 to cover public outreach implementation costs, including potential extra services, and City staff costs. The City anticipates applying for a Drinking Water State Revolving Fund loan from the California Water Resources Control Board to fund the Project cost, including outreach service, environmental documentation, design, and construction.

ESTIMATED TOTAL PROJECT COST
*Cents have been rounded to the nearest dollar in this table.

TOTAL
Phase 1 Environmental Services (Rincon – awarded 6/13/23) $120,695 Phase 2 Environmental Services (Rincon – awarded 5/14/24) $384,612 Professional Planning Services – Case Planner (future contract) $100,000 City Staff Costs - Planning $400,000
Environmental Subtotal $1,005,307
Phase 1 Strategic Communication Plan (K&A – awarded
10/17/23)
$148,786
Phase 2 Implement Public Outreach (K&A) $644,875
City Staff Costs – Public Outreach $300,000
Public Outreach Subtotal $1,093,661
Phase 1 Preliminary Design (KJ – awarded 5/14/24) $1,128,100 Phase 2 Design Services (future contract) $3,400,000
City Staff costs – Design $500,000
Design Subtotal $5,028,100
Estimated Construction Cost (future contract) $80,880,000 Other Construction Costs (Construction Management, Design Support, Inspection, City Staff, etc.)
$9,163,500
Construction Subtotal $90,043,500
TOTAL PROJECT COST $97,030,568
A copy of the contract may be requested from the Public Works Department for public review by contacting [email protected].

Council Agenda Report
Public Outreach Services for Design of the Vic Trace Reservoir Replacement Project [Agreement]
December 10, 2024

Page 4 ends

ENVIRONMENTAL REVIEW:

This Project requires California Environmental Quality Act (CEQA) environmental compliance and permitting. A contract with Rincon for the first phase in the Project’s initial CEQA documentation process was awarded on June 13, 2023. Phase 1 environmental documentation was completed in October 2023. Phase 2 environmental analysis and documentation will be conducted under Rincon’s contract awarded May 14, 2024. The Project’s required environmental documentation and permits will be secured prior to the commencement of construction.

WATER COMMISSION RECOMMENDATION:

This item was presented to the Water Commission at its meeting on November 21, 2024, and the Commission voted 4-0-1 in support of staff’s recommendations.

ATTACHMENT: Project Location Map
PREPARED BY: Brian D’Amour, P.E., City Engineer/PM/rl
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
Project Location Map
Vic Trace Reservoir: 740 Dolores Drive (15 acres)
Vic Trace
Reservoir
Property

ATTACHMENT

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Parks and Recreation Department
Public Works Department
SUBJECT: Second Contract Amendment with RRM Design Group for Final Design and Construction Documents for the Dwight Murphy Field Renewal Project [Agreement]
RECOMMENDATION:

That Council authorize the Public Works Director to execute a second contract amendment with RRM Design Group in the amount of $18,700 for bid support services for the Dwight Murphy Field Renewal Project.

DISCUSSION:

Project Background
The City Council initiated the renovation of Dwight Murphy Field in May 2018 with the development of a community-based master plan (Master Plan). Developed through a series of community workshops, surveys, and commission and design review board meetings, Council reviewed the Master Plan in January 2019 and in August 2019, authorized a Memorandum of Understanding with the Gwendolyn Strong Foundation (the GSF), a local non-profit 503(c)(3) organization, to collaborate with the City of Santa Barbara (City) for the fundraising, design, and construction of the park improvements. In December 2019, Council accepted a donation of $250,000 from the GSF, and authorized the development of preliminary design documents for the Dwight Murphy Field Renewal Project (Project).

In July 2021, the Parks and Recreation Commission made findings for the Project pursuant to Santa Barbara Municipal Code Section 28.37.025, and in August 2021, the Planning Commission approved the Coastal Development Permit. In December 2021, the City Council accepted another donation of $460,000 from the GSF for the preparation of final plans and construction documents. The Project building permit is ready to issue, and construction bids are due on January 16, 2025. Construction is expected to start in March 2025.

Agenda Item No. 14
File Code No. 570.05
Council Agenda Report
Second Contract Amendment with RRM Design Group for Final Design and Construction Documents for the Dwight Murphy Field Renewal Project [Agreement] December 10, 2024

Page 2 ends

Project Description
The Project includes is a full- scale renovation of the 9-acre park first established in 1925 as the Municipal Soccer Field. Project elements include: a multi-sport turf field; informal activity area; all-abilities inclusive playground; expanded fitness area; family picnic area; trash enclosure; restroom; and the restoration of a portion of Sycamore Creek. Other amenities include trees, landscaping, accessible pathways, fencing, lighting, right-of-way and park access improvements for vehicular circulation, a bus loading zone, and the increase of onsite and perimeter parking from 196 to 242 spaces.

Contract Amendment
On December 14, 2021, Council authorized the Public Works Director to execute a professional services agreement with with RRM Design Group in the amount of $838,191 to prepare final design and construction documents, including specifications and estimates, for the Project. On April 18, 2023, Council approved the first contract amendment for $83,590 for supplemental field investigation work. The purpose of the second contract amendment is to provide additional bid support for the Project.

BUDGET/FINANCIAL INFORMATION:

Funding for the contract amendment is appropriated in the Fiscal Year 2024 Measure C Capital Outlay Fund.

The following outlines the estimated total project cost, including the additional expenditure in this report:

Master Plan Design (by Contract) $121,559
Preliminary & Final Design, Construction Documents (by Contract) $1,505,865 City Staff Project Management, Permits, Services $143,351 Design Subtotal $1,770,775
Construction Estimate $20,164,808
Construction Estimate Change Order Allowance $2,016,481 City Furnished Materials and Equipment $500,000
Other Construction Costs (testing, biology, soils, etc.) $162,516 Construction Support Services (by Contract) $125,000
Construction Management/Inspection (by City Staff) $2,016,581 Consultant Design Support (by Contract) $295,950
Construction Subtotal $25,281,336
TOTAL ESTIMATED PROJECT COSTS $27,052,111
Project funding for construction includes $6 million from the Gwendolyn Strong Foundation, a $1.5 million Community Priority Funding grant supported by Congressman Salud Carbajal, $5.5 million in Measure C, and the balance from the recent debt issuance approved by Council.

Council Agenda Report
Second Contract Amendment with RRM Design Group for Final Design and Construction Documents for the Dwight Murphy Field Renewal Project [Agreement] December 10, 2024

Page 3 ends

SUSTAINABILITY IMPACT:

The Project will further the City’s sustainability goals through incorporating environmentally responsible design and construction techniques including, the specification of recycled content building materials, construction debris recycling, addition of electric vehicle chargers, and the use of native and drought tolerant landscaping.

A copy of the contract amendment may be requested from the Public Works Department for public review. Please contact [email protected] to request a copy.

PREPARED BY: Justin Van Mullem, Capital Projects Supervisor Brian D’Amour, City Engineer
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Human Resources Department
SUBJECT: Approval of Benefit Plans Effective January 1, 2025 RECOMMENDATION: That Council:

A. Approve the renewal rates for the: CalPERS Health Plans; Delta Dental Plans; Vision Service Plans; Employee Assistance Program (EAP); Health and Dependent Care Flexible Spending Accounts (FSA) benefits; and
B. Authorize the City Administrator to execute any necessary contracts or any amendments to agreements or contracts to effectuate the new rates.

DISCUSSION:

Each year, the City obtains renewal rates and new benefits for the benefit plans covering its eligible active and retired employees. These benefit plans include Medical, Dental, Vision, Employee Assistance Program (EAP), Health Flexible Spending Accounts (FSA), Dependent Care Flexible Spending Accounts (DCA-FSA), Term Life Insurance, and Disability Insurance programs. Staff coordinated this renewal process with the CalPERS Health Program and with the City’s benefits broker, USI Insurance Services. The Employee Benefits Committee (comprised of members from the various employee groups), has been apprised of the renewal information and the renewal rates. Staff recommends that the City renew its agreements with all current medical, dental, vision, and EAP plan providers.

Medical Plans
The City joined CalPERS Health Program effective January 1, 2020, replacing direct contracts with private insurers such Aetna and Kaiser. The CalPERS Health Program allows the City to offer employees and retirees a variety of health plans that best fit their health care needs.

The CalPERS Health Program offers several medical plans in Santa Barbara County including the Anthem Traditional HMO, Blue Shield Access+ and Blue Shield Trio HMO, Agenda Item No. 15
File Code No. 430.06
Council Agenda Report
Approval of Benefit Plans Effective January 1, 2025
December 10, 2024

Page 2 ends

PERS Gold PPO, PERS Platinum PPO, and PORAC PPO for members of the Peace Officers Research Association of California. Further, employees who reside in the Ventura County or Los Angeles County have access to additional plans such as the Anthem Select HMO, Kaiser Permanente HMO, UnitedHealthCare HMO, and HealthNet Salud HMO.

Under the CalPERS Health Benefits Program, retirees under the age of 65 have the same health plan choices as active employees and at the same rates. Medicare-eligible retirees have several Medicare Supplement plan options.

Health premiums for Region 2, which includes Santa Barbara and Ventura County, overall will increase an average of 9.01% for the HMO plans and 8.74% for the PPO plans.

Premiums for the CalPERS health plans remain competitive as they are one of the largest purchasers of health insurance in the state. Staff conducted a comparison of health plan rates against a competitor of CalPERS. CalPERS’ health plan premiums, over a threeyear period average, were still less than the competitor.

Dental Plans
There are three dental plans available for employees to select from. They are: the DeltaCare HMO plan, the Delta Dental DPO plan, and the Delta Dental Buy-Up DPO plan.

The Delta Dental PPO plans are similar to a medical PPO model plan in that they have a larger provider network, and it indemnifies the enrollees to select a provider of their choosing without a primary care dentist pre-designation requirement. The DeltaCare HMO plan is similar to a medical HMO model plan with a small provider network, and the enrollee is required to select a primary care dentist within Delta’s network. For 2025, Delta Dental, provider of the three dental plans for the City, will keep the HMO dental rates unchanged, with a slight decrease to the PPO dental rates. Rates for all three plans are displayed on Attachment 2.

Vision Plan
There are two vision plans available for employees to select from. They are VSP Basic and VSP Buy-Up Option. For 2025, there are no changes to both VSP plans.

Employee Assistance Program (EAP) – Employer Paid Fees
OptumHealth Behavioral Solutions provides outpatient psychological services for the City’s EAP. No increase is proposed for the 2025 EAP rate.

Flexible Spending Accounts (FSA) – Employer Paid Fees
The Health and Dependent Care Flexible Spending Accounts are administered by Discovery Benefits. No increase is proposed for the 2025 FSA fees.

Council Agenda Report
Approval of Benefit Plans Effective January 1, 2025
December 10, 2024

Page 3 ends

Basic Life/AD&D and Long-Term Disability Insurance – Employer Paid Premiums The Standard Insurance Company administers the Basic Life/AD&D and Long-Term Disability Insurance plans. No increases are proposed for the 2025 rates from the Standard.

Employee and Spouse Supplemental Life Insurance Plans – Employee Paid Premiums The Standard Insurance Company administers the voluntary employee-paid Supplemental Life Insurance plans offered to all benefited employees. No increases are proposed for the 2025 rates.

Short Term Disability Insurance Plan – Employee Paid Premiums The Standard Insurance Company administers the voluntary employee-paid Short Term Disability Insurance plans offered to Management, Police and Supervisors. No increases are proposed for the 2025 rates.

Benefits Administration Fee
As of July 1, 2020, the City contracted with Benefit Coordinators Corporation (BCC) for online enrollment and electronic benefits administration. There is an administration fee of $7.09 per enrolled employee per month. The current agreement with the Benefits Administration vendor keeps those fees unchanged until June 30, 2025.

Summary
Staff recommends that the CalPERS Health Benefits Program along with the Delta Dental DPO plans, DeltaCare HMO plan, VSP Vision plans, Optum EAP, Discovery Benefits FSA’s, Standard Life/AD&D and Disability Insurance plans be renewed for 2025 at the proposed premium rates.

Proposed 2025 monthly rates for the CalPERS Health Benefits Program for Active employees and Retirees are listed in Attachment 1.

Proposed 2025 monthly rates for Delta Dental PPO, Delta Dental Buy-up PPO plan, VSP Vision, VSP Buy-up plan, Optum EAP, Discovery Benefits FSA, Standard Life/AD&D and Disability Insurance Plans are listed in Attachment 2.

BUDGET/FINANCIAL INFORMATION:

Established City contribution amounts and employee pre-tax payroll deductions will fund the 2025 Plan Year (calendar year) estimated overall benefit premium increase.

Council Agenda Report
Approval of Benefit Plans Effective January 1, 2025
December 10, 2024

Page 4 ends

ATTACHMENTS: 1. 2025 Medical Plans Monthly Premium Rates

2. 2025 Dental, Vision, Employee Assistance Program, Flexible Accounts, Life and Disability Insurance Plan Monthly Premium Rates
PREPARED BY: Sam Ramirez, Labor Relations Manager
SUBMITTED BY: Wendy Levy, Human Resources Director
APPROVED BY: Kelly McAdoo, City Administrator
2024 and 2025 Medical Plan Monthly Premium Rates Attachment 1 Basic Premiums
Single 2-Party Family Single 2-Party Family
Anthem Blue Cross Del Norte EPO $1,314.27 $2,628.54 $3,417.10 N/A N/A N/A Anthem Blue Cross Select HMO $1,138.86 $2,277.72 $2,961.04 $1,256.65 $2,513.30 $3,267.29 Anthem Blue Cross Traditional HMO $1,339.70 $2,679.40 $3,483.22 $1,500.40 $3,000.80 $3,901.04 Blue Shield Access+ HMO $1,076.84 $2,153.68 $2,799.78 $1,170.17 $2,340.34 $3,042.44 Blue Shield Access+EPO $1,076.84 $2,153.68 $2,799.78 $1,170.17 $2,340.34 $3,042.44 Blue Shield Trio $946.84 $1,893.68 $2,461.78 $1,134.79 $2,269.58 $2,950.45 Health Net SmartCare N/A N/A N/A N/A N/A N/A
Kaiser Permanente $1,021.41 $2,042.82 $2,655.67 $1,112.90 $2,225.80 $2,893.54 Peace Officers Research Assoc. of CA (PORAC) $931.00 $2,117.00 $2,651.00 $975.00 $2,218.00 $2,777.00 PERS Gold $914.82 $1,829.64 $2,378.53 $1,013.70 $2,027.40 $2,635.62 PERS Platinum $1,314.27 $2,628.54 $3,417.10 $1,476.10 $2,952.20 $3,837.86 UnitedHealthcare SignatureValue Alliance $1,091.13 $2,182.26 $2,836.94 $1,184.58 $2,369.16 $3,079.91 UnitedHealthcare SignatureValue Harmony $937.39 $1,874.78 $2,437.21 $1,005.02 $2,010.04 $2,613.05 Western Health Advantage $807.23 $1,614.46 $2,098.80 $914.27 $1,828.54 $2,377.10 Anthem Blue Cross Select HMO $807.71 $1,615.42 $2,100.05 $919.00 $1,838.00 $2,389.40 Anthem Blue Cross Traditional HMO $1,034.38 $2,068.76 $2,689.39 $1,110.97 $2,221.94 $2,888.52 Blue Shield Access+ HMO $869.14 $1,738.28 $2,259.76 $948.53 $1,897.06 $2,466.18 Blue Shield Access+ EPO $869.14 $1,738.28 $2,259.76 $948.53 $1,897.06 $2,466.18 Blue Shield Trio $810.24 $1,620.48 $2,106.62 $909.10 $1,818.20 $2,363.66 Health Net Salud y Más $684.77 $1,369.54 $1,780.40 $823.49 $1,646.98 $2,141.07 Health Net SmartCare N/A N/A N/A N/A N/A N/A
Kaiser Permanente $904.95 $1,809.90 $2,352.87 $944.34 $1,888.68 $2,455.28 Peace Officers Research Assoc. of CA (PORAC) $926.00 $1,863.00 $2,371.00 $970.00 $1,951.00 $2,484.00 PERS Gold $799.44 $1,598.88 $2,078.54 $864.75 $1,729.50 $2,248.35 PERS Platinum $1,151.50 $2,303.00 $2,993.90 $1,258.76 $2,517.52 $3,272.78 Sharp Performance Plus $833.24 $1,666.48 $2,166.42 $868.45 $1,736.90 $2,257.97 UnitedHealthcare SignatureValue Alliance $837.88 $1,675.76 $2,178.49 $890.66 $1,781.32 $2,315.72 UnitedHealthcare SignatureValue Harmony $792.65 $1,585.30 $2,060.89 $819.64 $1,639.28 $2,131.06 Anthem Blue Cross Select HMO $841.13 $1,682.26 $2,186.94 $916.88 $1,833.76 $2,383.89 Anthem Blue Cross Traditional HMO $1,012.67 $2,025.34 $2,632.94 $1,065.46 $2,130.92 $2,770.20 Blue Shield Access+ HMO $756.65 $1,513.30 $1,967.29 $828.48 $1,656.96 $2,154.05 Blue Shield Trio $704.69 $1,409.38 $1,832.19 $738.11 $1,476.22 $1,919.09 Health Net Salud y Más $630.13 $1,260.26 $1,638.34 $714.40 $1,428.80 $1,857.44 Health Net SmartCare N/A N/A N/A N/A N/A N/A
Kaiser Permanente $865.41 $1,730.82 $2,250.07 $926.52 $1,853.04 $2,408.95 Peace Officers Research Assoc. of CA (PORAC) $926.00 $1,863.00 $2,371.00 $970.00 $1,951.00 $2,484.00 PERS Gold $785.28 $1,570.56 $2,041.73 $868.15 $1,736.30 $2,257.19 PERS Platinum $1,131.47 $2,262.94 $2,941.82 $1,263.73 $2,527.46 $3,285.70 UnitedHealthcare SignatureValue Alliance $826.44 $1,652.88 $2,148.74 $866.40 $1,732.80 $2,252.64 UnitedHealthcare SignatureValue Harmony $734.76 $1,469.52 $1,910.38 $756.28 $1,512.56 $1,966.33 2025
Region 1 (Generally, all northern CA counties such as Monterey, Napa, San Francisco, Santa Clara, Santa Cruz, etc.) Region 2 (Fresno, Imperial, Inyo, Kern, Kings, Madera, Orange, San Diego, San Luis Obispo, Santa Barbara, Tulare, and Ventura counties) Region 3 (Los Angeles, Riverside and San Bernardino Counties) 2024
2024 and 2025 Medical Plan Monthly Premium Rates Attachment 1 Kaiser $1,312.45 $2,624.90 $3,412.37 $1,422.26 $2,844.52 $3,697.88 Peace Officers Research Assoc. of CA (PORAC) $1,056.00 $2,144.00 $2,540.00 $1,106.00 $2,246.00 $2,661.00 PERS Platinum $1,146.86 $2,293.72 $2,981.84 $1,335.30 $2,670.60 $3,471.78 Plan Name Single 2-Party Family Single 2-Party Family
Anthem Medicare Preferred PPO $405.83 $811.66 $1,217.49 $487.56 $975.12 $1,462.68 Anthem Medicare Preferred PPO with
Dental/Vision $443.83 $849.66 $1,255.49 $487.56 $975.12 $1,462.68 Blue Shield Medicare PPO $392.68 $785.36 $1,178.04 $448.28 $896.56 $1,344.84 Blue Shield Medicare PPO with Dental/Vision $431.82 $824.50 $1,217.18 $448.28 $896.56 $1,344.84 Kaiser Permanente Senior Advantage $324.79 $649.58 $974.37 $343.08 $686.16 $1,029.24 Kaiser Permanente Senior Advantage with
Dental/Vision $340.45 $665.24 $990.03 $343.08 $686.16 $1,029.24 Peace Officers Research Assoc. of CA (PORAC)
Medicare Supplement $465.00 $1,030.00 $1,395.00 $507.00 $1,123.00 $1,521.00 PERS Gold $406.60 $813.20 $1,219.80 $546.13 $1,092.26 $1,638.39 PERS Platinum $448.15 $896.30 $1,344.45 $584.70 $1,169.40 $1,754.10 UnitedHealthcare Medicare Advantage Edge PPO $341.72 $683.44 $1,025.16 $442.25 $884.50 $1,326.75 UnitedHealthcare Medicare Advantage PPO with
Dental/Vision $368.76 $710.48 $1,052.20 $442.25 $884.50 $1,326.75 Out of State
Medicare Premium Rates - All Regions
Attachment 2
2025 Dental, Vision, Employee Assistance Program, Flexible Spending Accounts, Disability and Life Insurance Plans Monthly Premium Rates PLAN CURRENT 2024 PROPOSED 2025
Delta Dental DPO Plan
Employee Only $ 53.87 $ 51.18
Employee and One Dependent $ 95.34 $ 90.58
Employee and Family $ 152.82 $ 145.18
Delta Dental Buy-Up DPO Plan
Employee Only $ 58.40 $ 60.34
Employee and One Dependent $ 103.35 $ 106.80
Employee and Family $ 165.66 $ 171.18
DeltaCare HMO Plan
Employee Only $ 15.57 $ 15.57
Employee and One Dependent $ 27.85 $ 27.85
Employee and Family $ 41.21 $ 41.21
Vision Service Plan (VSP)
Employee Only $ 6.93 $ 6.93
Employee and One Dependent $ 13.76 $ 13.76
Employee and Family $ 21.10 $ 21.10
Vision Service Plan (VSP) Buy-Up Plan
Employee Only $ 9.04 $ 9.04
Employee and One Dependent $ 17.95 $ 17.95
Employee and Family $ 27.52 $ 27.52
Optum Employee Assistance Program (City Paid)
Employee and Family $ 1.78 $ 1.78
Discovery Benefits Flexible Spending Accounts Administration Costs (City Paid) Health Care Account/Participant/Month $ 3.75 $ 3.75
Dependent Care Account/Participant/Month $ 3.75 $ 3.75
Electronic Payment Card/Participant/Month $ 0 $ 0
Grace Period Processing/Participant/Month $ 0 $ 0
Long Term Disability Insurance – Standard (City Paid)
All Employees except Police and Fire $0.29/$100 $0.29/$100 Short Term Disability Insurance – Standard (Voluntary Employee Paid) Managers $ 22.02 $ 22.02
Supervisors $ 19.82 $ 19.82
Police $ 15.14 $ 15.14
Basic Life AD&D Insurance – Standard (City Paid)
All Employees $0.100/$1,000 $0.100/$1,000
Supplemental Employee, Spouse & Child Life Insurance–Standard (Voluntary Employee Paid) Paid) Voluntary Employee and Spouse Life Insurance Rates/$10,000 Rates/$10,000 Up to and including age 29 $ 0.68 $ 0.68
Age 30-34 $ 0.86 $ 0.86
Age 35-39 $ 1.24 $ 1.24
Age 40-44 $ 1.90 $ 1.90
Age 45-49 $ 3.14 $ 3.14
Age 50-54 $ 5.24 $ 5.24
Age 55-59 $ 8.46 $ 8.46
Age 60-64 $ 11.12 $ 11.12
Age 65-69 $ 17.48 $ 17.48
Attachment 2
Age 70-74 $ 30.88 $ 30.88
Age 75 and older $ 51.50 $ 51.50
$2,000 Voluntary Child Life Insurance $ 0.33 $ 0.33
$5,000 Voluntary Child Life Insurance $ 0.55 $ 0.55
$10,000 Voluntary Child Life Insurance $ 0.89 $ 0.89

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Sustainability & Resilience Department
SUBJECT: Santa Barbara Clean Energy 2023 Power Content Label Attestation RECOMMENDATION:

That Council approve the attestation specified under California’s Power Source Disclosure Program, which requires the governing Council of a public agency providing retail electric service to endorse the accuracy of each annual report and power content label, as submitted to the California Energy Commission, for the previous year.

DISCUSSION:

The California Public Utilities Code requires all retail sellers of electric energy, including Santa Barbara Clean Energy (SBCE), to disclose “accurate, reliable, and simple-tounderstand information on sources of energy” that are delivered to their respective customers via an annual Power Content Label (PCL). The PCL is analogous to a nutrition label, conveying information regarding the various power sources/products that are procured on behalf of each retail electricity customer. Each of California’s retail electricity sellers, including SBCE, will have unique PCLs based on internally adopted procurement policies, statutory procurement mandates, and related power purchases that were completed during the reporting year.

The PCL format is highly prescriptive, offering little flexibility to retail sellers on how to present the information to customers and the California Energy Commission (CEC) administers these requirements under California’s Power Source Disclosure (PSD) Program. Information presented in each PCL includes the proportionate share of total energy supply related to specific fuel sources/resource categories, including both renewable and conventional generating technologies.

An emission factor for each retail service offering, calculated using the CEC’s prescribed methodology, is also provided in the PCL. If a retail seller procures a certain percentage of its energy requirements from the market at large (meaning, sources of power that cannot be traced back to a specific generator), the PCL must identify such purchases as “unspecified sources of power.” It is common for most retail electricity sellers to utilize some amount of “unspecified power.”
Agenda Item No. 16
File Code No. 630.06
Council Agenda Report
Santa Barbara Clean Energy 2023 Power Content Label Attestation December 10, 2024

Page 2 ends

In accordance with statewide mandates and internally adopted planning targets, SBCE procured a substantial portion of its electric energy supply from generating resources utilizing various renewable fuel sources in 2023. Per the California Renewable Portfolio Standard (RPS), renewable fuel sources may include biomass & waste, eligible hydroelectricity, solar, geothermal, and wind.

For SBCE Green Start customers, 59.4% of total energy supply was sourced from RPSeligible renewable energy resources in 2023. When comparing percentages presented in Schedule 3 of the Power Source Disclosure Report and Power Content Label, please note that these distinct reports apply different numeric rounding conventions, so percentages may not match exactly. For SBCE 100% Green customers, 45% of total energy supply was sourced from bundled California RPS-eligible renewable energy resources, with the remaining 55% sourced from carbon-free large hydroelectric sources.

In order to fulfill its PSD Program reporting obligations for 2023, SBCE will provide the CEC with the City Council’s attestation regarding the accuracy of information included in each annual Power Source Disclosure Report (submitted to the CEC earlier in 2024, according to the applicable reporting deadline) and PCL, consistent with the following element of PSD Program regulations (where subdivision (a)(1) refers to a third-party audit, which is not necessary for public agencies, including the City.):

A retail supplier that is a public agency providing electric services is not required to comply with the provisions of subdivision (a)(1) if the board of directors of the public agency submits to the Energy Commission an attestation of the veracity of each annual report and power content label for the previous year.

While developing SBCE’s PCL, California Choice Energy Authority (CalChoice) and its technical consultants performed a detailed review of all power purchases completed for the 2023 calendar year. The review found no inaccuracies or inconsistencies in such information, which was subsequently entered in SBCE’s annual Power Source Disclosure reports and PCL.

Therefore, Council is being asked to provide an attestation covering both the PCL and associated Annual Reports to fulfill its attestation requirements for 2023, as specified in the excerpt above. Furthermore, consistent with applicable regulations, all customers currently enrolled in the SBCE program will receive the PCL via electronic communication or U.S. mail on or before January 31, 2025.

Upon approval, a copy of this staff report and related meeting minutes will be forwarded to the CEC, thereby completing SBCE’s attestation requirements under California’s Power Source Disclosure Program for the 2023 calendar year.

Council Agenda Report
Santa Barbara Clean Energy 2023 Power Content Label Attestation December 10, 2024

Page 3 ends

BUDGET/FINANCIAL INFORMATION:

The cost to prepare and mail the required PCL mailers is included in the FY2024 budget expenditure appropriations in the Clean Energy Fund. There is no other financial implication relating to this effort.

ENVIRONMENTAL REVIEW:

The recommendations in this report are not subject to the California Environmental Quality Act.

ATTACHMENTS: 1. SBCE 2023 Power Content Label

2. SBCE Green Start 2023 PSD Annual Report

3. SBCE 100% Green 2023 PSD Annual Report

PREPARED AND
SUBMITTED BY: Alelia Parenteau, Sustainability and Resilience Director APPROVED BY: Kelly McAdoo, City Administrator
2023 POWER CONTENT LABEL
Santa Barbara Clean Energy
https://www.sbcleanenergy.com/
Greenhouse Gas Emissions Intensity
(lbs CO2e/MWh) Energy Resources
2023 SBCE
100% Green
Power Mix
2023 SBCE
Green Start
Power Mix
2023 CA
Power Mix
Eligible Renewable1 45.0% 50.0% 36.9%
Biomass & Biowaste 0.0% 0.0% 2.1%
0 478 373 Geothermal 0.0% 3.6% 4.8%
Eligible Hydroelectric 1.1% 0.4% 1.8%
Solar 19.3% 2.8% 17.0%
Wind 24.6% 43.2% 11.2%
Coal 0.0% 0.0% 1.8%
Large Hydroelectric 55.0% 0.0% 11.7%
Natural Gas 0.0% 0.0% 36.6%
Nuclear 0.0% 0.0% 9.3%
Other 0.0% 0.0% 0.1%
Unspecified Power2 0.0% 50.0% 3.7%
TOTAL 100.0% 100.0% 100.0%
Percentage of Retail Sales Covered by Retired Unbundled RECs3: 0% 9% 1 The eligible renewable percentage above does not reflect RPS compliance, which is determined using a different methodology. 2 Unspecified power is electricity that has been purchased through open market transactions and is not traceable to a specific generation source. 3
Renewable energy credits (RECs) are tracking instruments issued for renewable generation. Unbundled renewable energy credits (RECs) represent renewable generation that was not delivered to serve retail sales. Unbundled RECs are not reflected in the power mix or GHG emissions intensities above.

For specific information about this electricity
portfolio, contact:

Santa Barbara Clean Energy
1 (805) 991-7699
For general information about the Power Content
Label, visit:
https://www.energy.ca.gov/programs-and-topics/programs/powersource-disclosure-program 2023 SBCE Green
Start Power Mix
2023 SBCE 100%
Green Power Mix
2023 CA Utility
Average
0 200
400
600
800
1000
2023 SBCE 100%
Green Power Mix
2023 SBCE Green
Start Power Mix
2023 CA Utility
Average
ATTACHMENT 1
Santa Barbara Clean Energy
735 Anacapa Street
Santa Barbara, CA 93101
Version: April 2024
26,510
13,255
13,255
---
13,255
5,753

0.2170

DIRECTLY DELIVERED RENEWABLES
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID N/A EIA ID
Gross MWh
Procured
MWh
Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions (in
MT CO2e) N/A
Cape Scott Wind - Cape Scott Wind Wind BC W3959 60600A P149 10721 10,721 10,721 - - Fontana - Fontana Eligible hydro CA W326 60451A 332 3 3 3 - -FTS Master Tenant 1, LLC - A - FTS Master Tenant 1, LLC - A Solar CA W4180 61318A 58761 2 2 2 - -FTS Master Tenant 1, LLC - B - FTS Master Tenant 1, LLC - B Solar CA W4181 61319A 58762 2 2 2 - - Garnet Solar Power Generation Station 1, LLC - Garnet Solar Power Generation Station 1, LLC Solar CA W4506 61182A 58528 2 2 2 - -Golden Springs Building F, LLC - Golden Springs Building F, LLC Solar CA W5479 63032A 60151 1 1 1 - - Golden Springs Development Company LLC - Building H - Santa Fe Springs Rooftop Solar Solar CA W4609 62745A 58913 1 1 1 - -Golden Springs Development Company LLC - Building M - Santa Fe Springs Rooftop Solar Solar CA W4610 62746A 58912 1 1 1 - -Great Valley Solar 3, LLC - RE Tranquillity 8 Azul Solar CA W5866 63281A 59939 21 21 21 - - Highlander Solar 1, LLC - Highlander Solar 1, LLC Solar CA W3663 61157A 58234 20 20 20 - - Highlander Solar 2, LLC - Highlander Solar 2, LLC Solar CA W3664 61158A 58227 15 15 15 - - Imperial Valley Solar 3, LLC - Mount Signal Solar Farm V Solar CA W7036 61649A 61202 326 326 326 - - Jacumba Solar, LLC - Jacumba Solar Farm Solar CA W5601 63057A 60947 25 25 25 - - Kern River 1 - Kern River 1 Eligible hydro CA W330 60455A 340 107 107 107 - - Manzana - Manzana Wind LLC Wind CA W3105 61671A 57484 726 726 726 - -Ormat Dixie Valley, LLC - Ormat Dixie Valley, LLC Geothermal NV W334 60313A 52015 881 881 881 0.0635 56 Ormat Dixie Valley, LLC - Ormat Dixie Valley, LLC - Binary Unit Geothermal NV W7146 60313A 52015 84 84 84 0.0635 5 Solar Partners I, LLC - Ivanpah 2 Solar CA W4025 62274A 57073 317 317 317 0.0596 19

FIRMED-AND-SHAPED IMPORTS
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID
EIA ID of
REC
Source
EIA ID of
Substitute
Power
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e)
Eligible for
Grandfathered
Emissions?
- - #N/A- - #N/A- - #N/A- - #N/A
- - #N/A

SPECIFIED NON-RENEWABLE PROCUREMENTS
Facility Name Fuel Type
State or
Province N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
- - #N/A- - #N/A- - #N/A
- - #N/A- - #N/A- - #N/A- - #N/A- - #N/A- - #N/A

PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS
Facility Name Fuel Type N/A N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
- #N/A- #N/A- #N/A- #N/A
END USES OTHER THAN RETAIL SALES MWh
GHG Emissions Intensity (in MT CO2e/MWh)
Net Specified Natural Gas
Net Specified Coal & Other Fossil Fuels
Net Specified Nuclear, Large Hydro, Renewables, and ACS Power GHG Emissions (excludes grandfathered emissions)
Retail Sales (MWh)
Net Specified Procurement (MWh)
Unspecified Power (MWh)
Procurement to be adjusted
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
SCHEDULE 1: PROCUREMENTS AND RETAIL SALES
For the Year Ending December 31, 2023
Santa Barbara Clean Energy
Green Start
Instructions: Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. For EIA IDs for unspecified power or specified system mixes from asset-controlling suppliers, enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable. For specified procurements of ACS power, use the ACS Procurement Calculator to calculate the resource breakdown comprising the ACS system mix. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in cell N9. Unbundled RECs must not be entered on Schedule 1; these products must be entered on Schedule 2. At the bottom portion of the schedule, provide the other electricity end-uses that are not retail sales including, but not limited to transmission and distribution losses or municipal street lighting. Amounts should be in megawatt-hours.

ATTACHMENT 2
Version: April 2024 302,699 303,050 -351 -- 303,0504 0.0000 DIRECTLY DELIVERED RENEWABLES Facility Name Fuel Type State or Province WREGIS ID RPS ID N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured GHG Emissions Factor (in MT CO2e/MWh) GHG Emissions (in MT CO2e) N/A 67RK 8ME, LLC - Redcrest Solar Farm Solar CA W4780 62642A 58831 60 60 60 - - Adelanto Solar II, LLC - Adelanto Solar II, LLC Solar CA W4683 62640A 59440 36 36 36 - - Adelanto Solar, LLC - Adelanto Solar, LLC Solar CA W4758 62639A 59441 118 118 118 - - Adera Solar, LLC - Adera Solar, LLC Solar CA W4836 61388A 60027 59 59 59 - - Adobe Solar, LLC - Adobe Solar, LLC Solar CA W4119 61427A 57651 80 80 80 - - Algonquin SKIC 10 Solar, LLC - Algonquin SKIC 10 Solar, LLC Solar CA W5392 62879A 59412 38 38 38 - - Alta Wind I - Alta Wind I Wind CA W1727 60794A 57282 739 739 738 - - Alta Wind II - Alta Wind II Wind CA W1841 60795A 57291 614 614 613 - - Alta Wind III - Alta Wind III Wind CA W1842 61092A 57292 620 620 619 - - Alta Wind IV - Alta Wind IV Wind CA W2013 61093A 57293 322 322 322 - - Alta Wind IX - Alta 9 Wind CA W2904 61808A P346 391 391 391 - - Alta Wind V - Alta Wind V Wind CA W2068 61094A 57294 487 487 486 - - Alta Wind VII - Alta 7 Wind CA W2905 61807A P345 537 537 536 - - Alta Wind VIII - Alta Wind VIII Wind CA W2483 61288A 57292 387 387 387 - - Alta Wind X, LLC - Alta Wind X, LLC Wind CA W3537 62244A 58394 744 744 743 - - Alta Wind XI, LLC - Alta Wind XI, LLC Wind CA W3538 62245A 58395 527 527 526 - - American Kings Solar Project - American Kings Solar Project Solar CA W11005 61600A 60777 598 598 597 - - American Solar Greenworks, LLC - Summer Solar North Solar CA W4524 61506A 59600 23 23 23 - - Bishop Creek 2 - Bishop Creek - Unit 3 Eligible hydro CA W545 60444A 323 23 23 23 - - Bishop Creek 2 - Bishop Creek 2 Eligible hydro CA W320 60444A 323 24 24 24 - - Bishop Creek 2 - Bishop Creek 2 - Unit 2 Eligible hydro CA W544 60444A 323 24 24 24 - - Bishop Creek 3 - Bishop Creek 3 Eligible hydro CA W321 60446A 324 53 53 53 - - Bishop Creek 4 - Bishop Creek 4 Eligible hydro CA W322 60447A 325 12 12 12 - - Bishop Creek 4 - Bishop Creek 4 - Unit 2 Eligible hydro CA W548 60447A 325 12 12 12 - - Bishop Creek 4 - Bishop Creek 4 - Unit 3 Eligible hydro CA W549 60447A 325 24 24 24 - - Bishop Creek 4 - Bishop Creek 4 - Unit 4 Eligible hydro CA W550 60447A 325 27 27 27 - - Bishop Creek 4 - Bishop Creek 4 - Unit 5 Eligible hydro CA W551 60447A 325 24 24 24 - - Bishop Creek 5 - Bishop Creek 5 Eligible hydro CA W323 60448A 326 12 12 12 - - Bishop Creek 5 - Bishop Creek 5 - Unit 2 Eligible hydro CA W552 60448A 326 15 15 15 - - Bishop Creek 6 - Bishop Creek 6 Eligible hydro CA W324 60449A 327 19 19 19 - - Blythe Solar II, LLC - Blythe Solar II, LLC - Block 4 Solar CA W5072 63129A 60092 188 188 188 - - Blythe Solar II, LLC - Blythe Solar II, LLC - Block 5 Solar CA W5073 63129A 60092 192 192 192 - - Blythe Solar II, LLC - Blythe Solar II, LLC - Block 6 Solar CA W5222 63129A 60092 182 182 182 - - Blythe Solar II, LLC - Blythe Solar II, LLC - Block 7 Solar CA W5248 63129A 60092 147 147 147 - - Blythe Solar III, LLC - Blythe Solar III, LLC Solar CA W10157 63130A 60094 689 689 688 - - Borden Solar Farm - Borden Solar Farm Solar CA W10139 61829A 59531 260 260 260 - - Broadview Energy KW, LLC - BEKW Wind NM W5278 62643A 60152 1193 1,193 1,192 - - Broadview Energy, JN LLC - BEJN Wind NM W5277 63162A 60145 1505 1,505 1,503 - - California PV Energy at Jurupa - California PV Energy at Jurupa Solar CA W3924 62287A 58582 5 5 5 - - Cape Scott Wind - Cape Scott Wind Wind BC W3959 60600A P149 1033 1,033 1,032 - - Catalina Solar 2, LLC - Catalina Solar 2, LLC Solar CA W4263 62428A 59334 97 97 97 - - CED Atwell Island West - CED Atwell Island West Solar CA W4691 62468A 59414 100 100 100 - - CED Corcoran Solar 2, LLC - CED Corcoran Solar 2, LLC Solar CA W4681 61820A 59413 102 102 102 - - CED Ducor Solar 1, LLC - CED Ducor Solar 1, LLC Solar CA W5350 62882A 60079 65 65 65 - - CED Ducor Solar 2, LLC - CED Ducor Solar 2, LLC Solar CA W5351 62881A 60081 65 65 65 - - CED Ducor Solar 3, LLC - CED Ducor Solar 3, LLC Solar CA W5353 62884A 60151 77 77 77 - - CED Ducor Solar 4, LLC - CED Ducor Solar 4, LLC Solar CA W5352 62883A 60080 102 102 102 - - CED Wistaria Solar, LLC - Wistaria Ranch Solar Solar CA W7130 62623A 61750 622 622 621 - - Central Antelope Dry Ranch C, LLC - Central Antelope Dry Ranch C, LLC Solar CA W5006 61324A 59963 59 59 59 - - Citizen Solar B, LLC - Citizen Solar B Solar CA W4840 61488A 62052 14 14 14 - - Copper Mountain Solar 4 - Copper Mountain Solar 4, LLC Solar NV W5023 62662A 59814 465 465 464 - - Coronal Lost Hills, LLC - Coronal Lost Hills, LLC Solar CA W4631 62235A 59638 68 68 68 - - Retail Sales (MWh) Net Specified Procurement (MWh) Unspecified Power (MWh) Procurement to be adjusted 2023 POWER SOURCE DISCLOSURE ANNUAL REPORT SCHEDULE 1: PROCUREMENTS AND RETAIL SALES For the Year Ending December 31, 2023 Santa Barbara Clean Energy 100% Green GHG Emissions Intensity (in MT CO2e/MWh) Net Specified Natural Gas Net Specified Coal & Other Fossil Fuels Net Specified Nuclear, Large Hydro, Renewables, and ACS Power GHG Emissions (excludes grandfathered emissions) Instructions: Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. For EIA IDs for unspecified power or specified system mixes from asset-controlling suppliers, enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable. For specified procurements of ACS power, use the ACS Procurement Calculator to calculate the resource breakdown comprising the ACS system mix. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in cell N9. Unbundled RECs must not be entered on Schedule 1; these products must be entered on Schedule 2. At the bottom portion of the schedule, provide the other electricity end-uses that are not retail sales including, but not limited to transmission and distribution losses or municipal street lighting. Amounts should be in megawatt-hours. ATTACHMENT 3 Version: April 2024 Desert Stateline LLC - Stateline Solar, Block 1 Solar CA W4849 60936A P308 162 162 162 - - Desert Stateline LLC - Stateline Solar, Block 2 Solar CA W4881 60936A 58646 162 162 - 162 - Desert Stateline LLC - Stateline Solar, Block 3 Solar CA W4882 60936A 58646 146 146 - 146 - Desert Stateline LLC - Stateline Solar, Block 4 Solar CA W4914 60936A 58646 162 162 - 162 - Desert Stateline LLC - Stateline Solar, Block 5 Solar CA W4946 60936A 58646 162 162 - 162 - Desert Stateline LLC - Stateline Solar, Block 6 Solar CA W4965 60936A 58646 162 162 - 162 - Desert Stateline LLC - Stateline Solar, Block 7 Solar CA W5021 60936A 58646 106 106 - 106 - Desert Stateline LLC - Stateline Solar, Block 7 R Solar CA W5067 60936A 58646 55 55 - 55 - Desert Stateline LLC - Stateline Solar, Block 8 Solar CA W5068 60936A 58646 146 146 - 146 - Desert Sunlight 250 - Desert Sunlight 250, Block 12 Solar CA W3965 60940A 58542 174 174 - 174 - Desert Sunlight 250 - Desert Sunlight 250, Block 13 Solar CA W3966 60940A 58542 174 174 174 - - Desert Sunlight 250 - Desert Sunlight 250, Block 14 Solar CA W4097 60940A 58542 118 118 118 - - Desert Sunlight 250 - Desert Sunlight 250, Block 15 Solar CA W4098 60940A 58542 61 61 - 61 - Desert Sunlight 250 - Desert Sunlight 250, Block 18 Solar CA W4189 60940A 58542 129 129 129 - - Desert Sunlight 250 - Desert Sunlight 250, Block 19 Solar CA W4453 60940A 58542 112 112 112 - - Desert Sunlight 250 - Desert Sunlight 250, Blocks 16, 17, 20 Solar CA W3884 60940A 58542 342 342 342 - - DG Solar Lessee II, LLC - E Philadelphia - DG Solar Lessee II, LLC - E Philadelphia Solar CA W4926 62721A 59916 2 2 2 - - Dokie Wind - Dokie Wind Wind BC W1992 61360A P150 12551 12,551 - 12,536 - Duran Mesa LLC - Duran Mesa LLC Wind NM W12070 64728A 64065 17047 17,047 - 17,027 - El Cabo Wind - El Cabo Wind Wind NM W5788 62786A 58098 2495 2,495 - 2,492 - Fontana - Fontana Eligible hydro CA W326 60451A 332 9 9 - 9 - Freeway Springs, LLC - Freeway Springs, LLC Solar CA W5385 63031A 60183 3 3 - 3 - FTS Master Tenant 1, LLC - A - FTS Master Tenant 1, LLC - A Solar CA W4180 61318A 58761 6 6 - 6 - FTS Master Tenant 1, LLC - B - FTS Master Tenant 1, LLC - B Solar CA W4181 61319A 58762 7 7 - 7 - Garnet Solar Power Generation Station 1, LLC - Garnet Solar Power Generation Station 1, Solar CA W4506 61182A 58528 11 11 - 11 - Golden Solar, LLC - Dulles - Golden Solar, LLC - Dulles Solar CA W5227 63030A 60182 4 4 4 - - Golden Springs Building F, LLC - Golden Springs Building F, LLC Solar CA W5479 63032A 60151 3 3 3 - - Golden Springs Development Company LLC - Building H - Santa Fe Springs Rooftop SolarSolar CA W4609 62745A 58913 3 3 3 - - Golden Springs Development Company LLC - Building M - Santa Fe Springs Rooftop Sola Solar CA W4610 62746A 58912 4 4 4 - - Golden Springs Development Company, LLC - Building G Solar CA W5480 63033A 60153 4 4 4 - - Great Valley Solar 3, LLC - RE Tranquillity 8 Azul Solar CA W5866 63281A 59939 83 83 83 - - Highlander Solar 1, LLC - Highlander Solar 1, LLC Solar CA W3663 61157A 58234 50 50 - 50 - Highlander Solar 2, LLC - Highlander Solar 2, LLC Solar CA W3664 61158A 58227 37 37 - 37 - Imperial Valley Solar 3, LLC - Mount Signal Solar Farm V Solar CA W7036 61649A 61202 1061 1,061 - 1,060 - Jacumba Solar, LLC - Jacumba Solar Farm Solar CA W5601 63057A 60947 68 68 - 68 - Kern River 1 - Kern River 1 Eligible hydro CA W330 60455A 340 235 235 - 235 - Lancaster Dry Farm Ranch B, LLC - Lancaster Dry Farm Ranch B, LLC Solar CA W4418 61315A 58750 20 20 - 20 - Lancaster Little Rock C LLC - Lancaster Little Rock C LLC Solar CA W4492 61311A 59262 17 17 - 17 - Lone Valley Solar Park I, LLC - Lone Valley Solar Park I, LLC Solar CA W4427 61458A 58417 50 50 - 50 - Lone Valley Solar Park II, LLC - Lone Valley Solar Park II, LLC Solar CA W4428 61452A 59237 107 107 - 107 - Longboat Solar, LLC - Longboat Solar, LLC Solar CA W5306 62805A 60485 54 54 - 54 - Lundy - Lundy Eligible hydro CA W331 60456A 342 11 11 11 - - Lundy - Lundy - Unit 2 Eligible hydro CA W560 60456A 342 11 11 - 11 - Manzana - Manzana Wind LLC Wind CA W3105 61671A 57484 3458 3,458 - 3,454 - Master Development - Corona, CA (1351 Railroad) - Master Development - Corona, CA (1 Solar CA W3497 61735A P306 3 3 3 - - Maverick Solar, LLC - Maverick Solar, LLC Solar CA W10973 63321A 62178 706 706 705 - - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 1 Solar CA W4935 62091A 58462 217 217 217 - - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 2 Solar CA W4936 62091A 58462 108 108 108 - - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 3 Solar CA W5016 62091A 58642 99 99 99 - - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 4 Solar CA W4763 62091A 58462 162 162 - 162 - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 5 Solar CA W4826 62091A 58462 162 162 - 162 - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 6 Solar CA W4827 62091A 58462 139 139 - 139 - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 7 Solar CA W4879 62091A 58462 217 217 - 217 - McCoy Solar, LLC - Genesis McCoy Solar Energy Center, Block 8 Solar CA W4630 62091A 58462 189 189 - 189 - Meikle Wind - Meikle Wind Wind BC W5189 63268A P151 6327 6,327 - 6,320 - Mesquite Solar 2, LLC - Mesquite Solar 2, LLC Solar AZ W5299 62664A 60307 587 587 - 586 - Mill Creek 3 - Mill Creek 3 - Unit 3 Eligible hydro CA W332 60459A 7147 7 7 - 7 - Mill Creek 3 - Mill Creek 3 - Unit 4 Eligible hydro CA W555 60459A 7147 7 7 - 7 - Mill Creek 3 - Mill Creek 3 - Unit 5 Eligible hydro CA W556 60459A 7147 7 7 - 7 - Moose Lake Wind - Moose Lake Wind Wind BC W7518 64287A P152 782 782 - 781 - Mound Solar Partnership XI, LLC - Antelope Valley Solar AVS Lancaster I Solar CA W5744 63713A 59167 11 11 - 11 - Mount Signal Solar Farm II - Mount Signal Solar Farm II Solar CA W7762 61648A 61353 786 786 - 785 - Mustang Hills, LLC - Mustang Hills, LLC Wind CA W2482 61287A 57833 514 514 - 513 - Nicolis, LLC - Nicolis Solar PV Plant Solar CA W5131 61667A 59600 90 90 - 90 - North Lancaster Ranch, LLC - North Lancaster Ranch, LLC Solar CA W5386 61538A 59962 59 59 - 59 - North Rosamond Solar, LLC - North Rosamond Solar, LLC Solar CA W7426 62290A 59879 730 730 - 729 - NRG Solar Oasis LLC - Oasis Solar Solar CA W4700 62514A 59528 111 111 - 111 - Oltmans SCE at Champagne - California PV Energy at Champagne Solar CA W3923 62292A 58581 2 2 - 2 - Ontario 1 - Ontario 1 Eligible hydro CA W393 60460A P350 5 5 - 5 - Ontario 2 - Ontario 2 Eligible hydro CA W394 60461A P351 2 2 - 2 - Orion Solar II, LLC - Orion Solar II, LLC Solar CA W4186 61571A 58721 39 39 - 39 - Panoche Valley Solar - Panoche Valley Solar Solar CA W5851 60858A 57340 284 284 - 284 - Version: April 2024 Panoche Valley Solar - Panoche Valley Solar Phase 3 Solar CA W7275 60858A 57340 199 199 199 - - Panoche Valley Solar - Phase 2 Solar CA W7186 60858A 57340 158 158 - 158 - Park Meridian 1 - Kona Solar, LLC - Park Meridian 1 Solar CA W4577 62502A 59539 5 5 - 5 - Pennask Wind Farm - Pennask Wind Farm Wind BC W5499 64015A P153 706 706 - 705 - Poole - Poole Eligible hydro CA W338 60462A 353 73 73 - 73 - Portal - Portal Eligible hydro CA W339 60463A 354 43 43 - 43 - Portal Ridge Solar B, LLC - Portal Ridge Solar B, LLC Solar CA W5546 62835A 60310 83 83 - 83 - Porterville - SPVP042 - Porterville - SPVP042 Solar CA W1977 61241A 58309 14 14 - 14 - Pumpjack Solar - Pumpjack Solar Solar CA W4413 61368A 59322 94 94 - 94 - Quality Wind - Quality Wind Wind BC W3160 62247A P154 12204 12,204 - 12,190 - Rancho Cucamonga Distribution Center 1 - Kona Solar, LLC - Rancho Cucamonga DistribuSolar CA W4579 62498A 59540 6 6 6 - - RE Adams East, LLC - RE Adams East, LLC Solar CA W4344 61266A 58984 64 64 - 64 - RE Columbia 3 LLC - RE Columbia 3 LLC Solar CA W3898 61162A 58502 45 45 - 45 - RE Garland A - Garland A Solar CA W5005 62818A 60386 103 103 - 103 - RE Rio Grande, LLC - RE Rio Grande, LLC Solar CA W3896 60823A 58500 19 19 - 19 - RE Rosamond Two LLC - RE Rosamond Two LLC Solar CA W3899 60856A 58499 77 77 77 - - RE Tranquillity - RE Tranquillity Solar CA W4898 61269A 59939 996 996 - 995 - RE Victor Phelan Solar One LLC - RE Victor Phelan Solar One LLC Solar CA W3897 60838A 58202 81 81 - 81 - Redlands Distribution Center #10 (RDC10) - Redlands Distribution Center #10 (RDC10) Solar CA W4513 62208A P400 1 1 - 1 - Regulus Solar, LLC - Regulus Solar, LLC Solar CA W4387 61428A 57650 289 289 - 289 - Rialto I-210 Distribution Center #2 (RI 210-2) - Rialto I-210 Distribution Center #2 (RI 210-2 Solar CA W2765 61747A P401 2 2 - 2 - Rio Bravo Solar I - Rio Bravo Solar I Solar CA W5346 61369A 59249 101 101 - 101 - Rio Bravo Solar II - Rio Bravo Solar II Solar CA W5371 62716A 59250 104 104 104 - - Rising Tree Wind Farm III LLC - Rising Tree Wind Farm III LLC Wind CA W4612 62469A 59236 505 505 - 504 - Rising Tree Wind Farm LLC - Rising Tree Wind Farm LLC Wind CA W4444 62425A 57621 462 462 - 461 - Rush Creek - Rush Creek Eligible hydro CA W340 60464A 357 37 37 - 37 - Rush Creek - Rush Creek - Unit 2 Eligible hydro CA W557 60464A 357 45 45 45 - - SEPV Mojave West, LLC - SEPV Mojave West, LLC Solar CA W5047 61156A 59740 113 113 - 113 - SEPV Palmdale East, LLC - SEPV Palmdale East Solar CA W4713 61154A 59273 52 52 - 52 - Shinish Creek Wind Farm - Shinish Creek Wind Farm Wind BC W5500 64041A P160 676 676 - 675 - Sierra - Sierra Eligible hydro CA W390 60467A P352 5 5 - 5 - Sierra Solar Greenworks - Sierra Solar Greenworks Solar CA W4811 61334A 59431 70 70 - 70 - Silver State Solar Power South, Block 2 and 3 - Silver State Solar Power South, Block 2 an Solar NV W4876 61050A 58644 357 357 357 - - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 1 Solar NV W4829 61050A 58644 144 144 - 144 - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 4 Solar NV W4878 61050A 58644 195 195 - 195 - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 5 Solar NV W4947 61050A 58644 192 192 - 192 - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 6 Solar NV W4966 61050A 58644 153 153 153 - - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 6R, 7, 8 Solar NV W5063 61050A 58644 323 323 - 323 - Silver State Solar Power South, LLC - Silver State Solar Power South, Block 8R Solar NV W5064 61050A 58644 5 5 - 5 - Solar Partners I, LLC - Ivanpah 2 Solar CA W4025 62274A 57073 59 59 59 0.0596 4 Solar Star California XIII, LLC - Quinto Solar Project Solar CA W4825 61362A 59339 455 455 - 454 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-1) Solar CA W4641 61363A 58388 305 305 305 - - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-2) Solar CA W4562 61363A 58388 305 305 - 305 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-3) Solar CA W4393 61363A 58388 330 330 - 330 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-4) Solar CA W4678 61363A 58388 141 141 - 141 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-5A) Solar CA W4064 61363A 58388 214 214 - 214 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-5B) Solar CA W4392 61363A 58388 84 84 - 84 - Solar Star California XIX, LLC - AVS1 Solar Star 1 (Block 1-6) Solar CA W4099 61363A 58388 370 370 - 370 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2A-1) Solar CA W4243 61364A 58389 302 302 - 302 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2A-2) Solar CA W4457 61364A 58389 280 280 - 280 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2A-3) Solar CA W4458 61364A 58389 242 242 - 242 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2A-4) Solar CA W4679 61364A 58389 204 204 - 204 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2B-2) Solar CA W4065 61364A 58389 191 191 - 191 - Solar Star California XX, LLC - AVS 2 Solar Star 2 (Block 2B-3) Solar CA W4100 61364A 58389 171 171 - 171 - Sun Streams, LLC - Sun Streams, LLC Solar AZ W8859 62673A 63440 844 844 - 843 - SunE Solar XV Lessor, LLC - Hesperia Solar CA W4261 62236A 59182 7 7 - 7 - SunE Solar XVI Lessor, LLC - SunE - Pico Rivera Solar CA W4804 62725A P304 3 3 - 3 - SunE Solar XVI Lessor, LLC - SunE - Rochester Solar CA W5219 62719A 60032 2 2 - 2 - Sunray Energy 3, LLC - Sunray Energy 3, LLC – SEGS I Solar CA W465 63260A 10438 66 66 - 66 - Sunshine Valley Solar - Sunshine Valley Solar Solar NV W8128 62772A 59826 482 482 - 481 - TA-High Desert - Antelope Power Plant Solar CA W3496 60937A 58149 94 94 - 94 - Terra Francesco 1 - Kona Solar, LLC - Terra Francesco 1 Solar CA W4578 62503A 59541 4 4 - 4 - Tropico, LLC - Tropico Solar PV Plant Solar CA W5132 61700A 59599 62 62 - 62 - Tule Wind, LLC - Tule Wind, LLC Wind CA W5902 63271A 57913 911 911 - 910 - Valentine Solar, LLC - Valentine Solar, LLC Solar CA W8806 63026A 62288 540 540 - 539 - Vega Solar, LLC - Vega Solar, LLC Solar CA W4543 61942A 59555 103 103 - 103 - Victor Dry Farm Ranch A LLC - Victor Dry Farm Ranch A LLC Solar CA W4573 61331A 58418 18 18 - 18 - Victor Dry Farm Ranch B LLC - Victor Dry Farm Ranch B LLC Solar CA W4574 61332A 58419 20 20 - 20 - Voyager Wind I - Voyager Wind I Wind CA W8807 63262A 60594 714 714 - 713 - Wildwood Solar - Wildwood Solar Solar CA W4414 61367A 59380 96 96 - 96 - Wildwood Solar II - Wildwood Solar II Solar CA W5374 62418A 59253 79 79 - 79 - Willow Springs 2 - Willow Springs 2 Solar CA W7213 62286A 60324 523 523 - 522 - Version: April 2024 Windstar - Windstar1 Wind CA W2742 60810A 57774 184 184 184 - - Windstar - Windstar2 Wind CA W2743 60810A 57774 210 210 - 210 - Kaweah 2 Eligible hydro CA W328 60453A 336 1 1 - 1 - Santa Ana 3 Eligible hydro CA W342 60466A 363 1 1 - 1 - Lytle Creek Eligible hydro CA W391 60457A P348 2 2 - 2 - Golden Springs Building L Solar CA W5481 63034A 60154 1 1 - 1 - A. G. Wishon Powerhouse - A. G. Wishon Powerhouse Eligible hydro CA W344 60032A 59440 28 28 - 28 - Agua Caliente Solar - Block 1 Solar AZ W2427 60894A 57373 336 336 - 336 - Agua Caliente Solar - Block 10 Solar AZ W3621 60894A 57373 221 221 - 221 - Agua Caliente Solar - Block 11 Solar AZ W3829 60894A 57373 282 282 - 282 - Agua Caliente Solar - Block 12 Solar AZ W3953 60894A 57373 127 127 - 127 - Agua Caliente Solar - Block 2 Solar AZ W2576 60894A 57373 336 336 - 336 - Agua Caliente Solar - Block 3 Solar AZ W2668 60894A 57373 336 336 - 336 - Agua Caliente Solar - Block 4 Solar AZ W2782 60894A 57373 227 227 - 227 - Agua Caliente Solar - Block 5 Solar AZ W2838 60894A 57373 338 338 - 338 - Agua Caliente Solar - Block 6 Solar AZ W2844 60894A 57373 338 338 - 338 - Agua Caliente Solar - Block 7 Solar AZ W2925 60894A 57373 229 229 - 229 - Agua Caliente Solar - Block 8 Solar AZ W3240 60894A 57373 282 282 - 282 - Agua Caliente Solar - Block 9 Solar AZ W2812 60894A 57373 282 282 - 282 - Alamo Solar - Alamo Solar Solar CA W4546 61453A 59469 207 207 - 207 - Alta Powerhouse - Alta Powerhouse Eligible hydro CA W335 60033A 214 12 12 - 12 - Antelope West Solar - Antelope West Solar Solar CA W4322 61850A 59443 231 231 - 231 - Atwell Island - Atwell Island PV Solar Generating Facility Solar CA W3159 60947A 58366 161 161 - 161 - AV Solar Ranch 1, LLC - Antelope Solar Ranch - Block 7 Solar CA W3474 60790A 57378 356 356 - 356 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 1 & 2 Solar CA W4141 60790A 57378 575 575 - 574 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 3 Solar CA W2803 60790A 57378 341 341 - 341 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 4 Solar CA W3274 60790A 57378 384 384 - 384 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 5 Solar CA W3275 60790A 57378 242 242 - 242 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 6 Solar CA W3280 60790A 57378 199 199 - 199 - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Ranch - Block 8 & 9 Solar CA W3849 60790A 57378 643 643 - 642 - Bakersfield Solar - SKIC 20 Solar CA W4550 61558A 59412 172 172 - 172 - Bayshore Solar A - Big Sky Solar 6 Solar CA W5731 63133A 60481 161 161 - 161 - Bayshore Solar B - Big Sky Solar 7 Solar CA W5737 63134A 60474 165 165 - 165 - Bayshore Solar C - Big Sky Solar 8 Solar CA W5738 63135A 60475 161 161 - 161 - Blackwell Solar - Blackwell Solar, LLC Solar CA W4587 61892A 60092 97 97 - 97 - CA Flats 150 - CA Flats 150 Solar CA W7112 62552A 60034 1315 1,315 - 1,313 - California Valley Solar Ranch - Block1 Solar CA W2847 60603A 57040 257 257 - 257 - California Valley Solar Ranch - Block2 Solar CA W3106 60603A 57040 592 592 591 - - California Valley Solar Ranch - Block3 Solar CA W3111 60603A 57040 1456 1,456 - 1,454 - California Valley Solar Ranch - Block4 Solar CA W3187 60603A 58831 505 505 - 504 - Cantua Solar Station - Cantua Solar Station Solar CA W2580 61823A 57522 179 179 - 179 - CED Corcoran - CED Corcoran Solar CA W3408 60948A 58374 173 173 - 173 - CED White River Solar - CED White River Solar Solar CA W3406 60949A 58373 220 220 - 220 - CID Solar - Corcoran Irrigation District - CID Solar, LLC Solar CA W4227 62285A 59183 189 189 - 189 - Coleman Powerhouse - Coleman Powerhouse Eligible hydro CA W347 60037A 227 148 148 - 148 - Copper Mountain Solar 2 - CMS 2 (1) Solar NV W2818 60990A 58017 371 371 - 371 - Copper Mountain Solar 2 - CMS 2 (2) Solar NV W2943 60990A 58017 330 330 - 330 - Copper Mountain Solar 2 - CMS 2 (3) Solar NV W3201 60990A 58017 330 330 - 330 - Copper Mountain Solar 2 - CMS 2 (4) Solar NV W4555 60990A 58017 331 331 - 331 - Copper Mountain Solar 2 - CMS 2 (5) Solar NV W4589 60990A 58017 331 331 - 331 - Crane Valley Powerhouse - Crane Valley Powerhouse Eligible hydro CA W349 60039A 230 18 18 - 18 - Cuyama Solar - Cuyama Solar Solar CA W5611 61891A 60043 383 383 - 383 - De Sabla Powerhouse - De Sabla Powerhouse Eligible hydro CA W351 60041A 232 73 73 - 73 - Deer Creek Powerhouse - Deer Creek Powerhouse Eligible hydro CA W350 60040A 233 58 58 - 58 - DESERT SUNLIGHT 300, LLC - DSL-BLK01 - 04 Solar CA W3793 61068A 57993 1763 1,763 - 1,761 - DESERT SUNLIGHT 300, LLC - DSL-BLK05 & 06 Solar CA W3798 61068A 57993 577 577 - 576 - DESERT SUNLIGHT 300, LLC - DSL-BLK07 & 08 Solar CA W3800 61068A 57993 278 278 - 278 - DESERT SUNLIGHT 300, LLC - DSL-BLK09 Solar CA W3801 61068A 57993 288 288 - 288 - DESERT SUNLIGHT 300, LLC - DSL-BLK10 & 11 Solar CA W3783 61068A 57993 577 577 - 576 - Dutch Flat No. 1 Powerhouse - Dutch Flat No. 1 Powerhouse Eligible hydro CA W352 60042A 237 537 537 - 536 - Five Points Solar Station - Five Points Solar Station Solar CA W2201 61432A 57498 96 96 - 96 - FPL Energy Montezuma Wind - FPL Energy Montezuma Wind Wind CA W1745 60543A 57201 315 315 - 315 - Gates Solar Station - Gates Solar Station Solar CA W3477 62353A 57892 185 185 - 185 - GENESIS SOLAR, LLC - SGN-1 Solar CA W3790 60605A 57394 559 559 - 558 - GENESIS SOLAR, LLC - SGN2 Solar CA W3791 60605A 57394 1348 1,348 - 1,346 - Giffen Solar Station - Giffen Solar Station Solar CA W2581 61822A 57521 45 45 - 45 - Guernsey Solar Station - Guernsey Solar Station Solar CA W3476 62354A 57891 127 127 - 127 - Hat Creek No. 1 Powerhouse - Hat Creek No. 1 Powerhouse Eligible hydro CA W355 60045A 243 139 139 - 139 - Hat Creek No. 2 Powerhouse - Hat Creek No. 2 Powerhouse Eligible hydro CA W356 60046A 244 107 107 - 107 - Henrietta Solar Plant - Parrey, LLC Solar CA W5056 61841A 58975 1003 1,003 - 1,002 - Huron Solar Station - Huron Solar Station Solar CA W2579 61821A 57523 143 143 - 143 - Java Solar - Java Solar Solar CA W13698 63137A P386 130 130 - 130 - Version: April 2024 Kansas - Kansas Solar CA W4192 61263A 58985 180 180 180 - - Kent South - Kent South Solar CA W4193 61262A 58991 184 184 - 184 - Lost Hills - Lost Hills Solar, LLC Solar CA W4586 61893A 58711 188 188 - 188 - Manzana - Manzana Wind LLC Wind CA W3105 61671A 57484 1281 1,281 - 1,280 - Michael E. Bowler Memorial Solar Farm - Westlands Solar Farm PV-1 Solar CA W3963 61755A 58616 154 154 - 154 - Midway Solar Farm I - Midway Solar Farm I Solar CA W5367 61295A 60336 533 533 - 532 - Mojave Solar Project - Mojave Solar Project - Alpha Solar CA W4255 60848A 57331 1302 1,302 - 1,300 - Mojave Solar Project - Mojave Solar Project - Beta Solar CA W4450 60848A 57331 1302 1,302 - 1,300 - Montezuma Wind II - Nextera Energy Montezuma II Wind Wind CA W2400 61345A 57701 664 664 - 663 - Newcastle Powerhouse - Newcastle Powerhouse Eligible hydro CA W364 60053A 632 6 6 - 6 - North Sky River - North Sky River - Phase I Wind CA W3206 61385A 58154 1409 1,409 - 1,407 - North Star Solar - North Star Solar, LLC Solar CA W4629 61198A 58713 563 563 - 562 - Old River One - Old River One Solar CA W4194 60853A 58986 143 143 - 143 - Orion Solar I - Orion Solar I, LLC Solar CA W3981 61570A 58718 121 121 - 121 - Phoenix Powerhouse - Phoenix Powerhouse Eligible hydro CA W366 60054A 264 24 24 - 24 - Portal Ridge Solar C - Portal Ridge Solar C Solar CA W5211 61684A 354 88 88 - 88 - RE Astoria 1 - RE Astoria 1 Solar CA W4930 62284A 59976 986 986 - 985 - Rising Tree Wind Farm II LLC - Rising Tree Wind Farm II LLC Wind CA W4445 62426A 59235 155 155 - 155 - Rock Creek - Rock Creek Unit 1 Eligible hydro CA W2643 62269A 275 39 39 - 39 - Rock Creek - Rock Creek Unit 2 Eligible hydro CA W2644 62269A 10809 117 117 - 117 - Shafter Solar, LLC - Shafter Solar, LLC Solar CA W4680 62325A 59408 64 64 - 64 - Shiloh IV Wind Project, LLC - Shiloh IV Wind Project, LLC Wind CA W2780 61617A 57725 981 981 - 980 - South Powerhouse - South Powerhouse Eligible hydro CA W370 60059A 280 71 71 - 71 - Spaulding No. 1 Powerhouse - Spaulding No. 1 Powerhouse Eligible hydro CA W371 60060A 281 81 81 - 81 - Spaulding No. 2 Powerhouse - Spaulding No. 2 Powerhouse Eligible hydro CA W372 60061A 282 43 43 - 43 - Spaulding No. 3 Powerhouse - Spaulding No. 3 Powerhouse Eligible hydro CA W373 60062A 283 114 114 - 114 - Spring Gap Powerhouse - Spring Gap Powerhouse Eligible hydro CA W374 60063A 284 175 175 - 175 - SPS Alpaugh 50 - SPS Alpaugh 50 Solar CA W2826 60945A 58003 355 355 - 355 - SPS Alpaugh North - SPS Alpaugh North Solar CA W2825 60946A 58002 103 103 - 103 - Stroud Solar Station - Stroud Solar Station Solar CA W2203 61434A 57497 158 158 - 158 - Sunray 2- SEGS II - Sunray 2- SEGS II Solar CA W466 62694A 10437 228 228 - 228 - Toadtown Powerhouse - Toadtown Powerhouse Eligible hydro CA W375 60064A 714 5 5 - 5 - Topaz Solar Farms LLC - Topaz 10-16 Solar CA W3226 61698A 57695 1811 1,811 - 1,809 - Topaz Solar Farms LLC - Topaz 17 - 20 Solar CA W3227 61698A 57695 986 986 - 985 - Topaz Solar Farms LLC - Topaz 1-9 Solar CA W3193 61698A 57695 2499 2,499 - 2,496 - Topaz Solar Farms LLC - Topaz 21 - 22 Solar CA W3229 61698A 57695 340 340 - 340 - Vaca Dixon Solar Station - Vaca Dixon Solar Station Solar CA W1455 60966A 57041 18 18 - 18 - Vasco Winds - Vasco Winds Wind CA W2401 61344A 57700 815 815 - 814 - Volta No. 1 Powerhouse - Volta No. 1 Powerhouse Eligible hydro CA W377 60066A 290 10 10 - 10 - Volta No. 2 Powerhouse - Volta No. 2 Powerhouse Eligible hydro CA W378 60067A 180 15 15 - 15 - West Gates Solar Station - West Gates Solar Station Solar CA W3478 62352A 58206 100 100 - 100 - West Point Powerhouse - West Point Powerhouse Eligible hydro CA W379 60068A 291 438 438 - 437 - Western Antelope Blue Sky Ranch A - WABSRA Solar CA W4264 61517A 58626 186 186 - 186 - Westside Solar Station - Westside Solar Station Solar CA W2202 61433A 57499 100 100 - 100 - Wise No. 1 Powerhouse - Wise No. 1 Powerhouse Eligible hydro CA W380 60069A 292 214 214 - 214 - Western Antelope Dry Ranch - Western Antelope Dry Ranch Solar CA W5262 61328A 58627 545 545 - 544 - - #N/A - FIRMED-AND-SHAPED IMPORTS Facility Name Fuel Type State or Province WREGIS ID RPS ID EIA ID of REC Source EIA ID of Substitute Power Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured GHG Emissions Factor (in MT CO2 e/MWh) GHG Emissions (in MT CO2e) Eligible for Grandfathered Emissions? - - #N/A- - #N/A- - #N/A- - #N/A- - #N/A SPECIFIED NON-RENEWABLE PROCUREMENTS Facility Name Fuel Type State or Province N/A N/A N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured GHG Emissions Factor (in MT CO2 e/MWh) GHG Emissions (in MT CO2e) N/A Big Creek 2A Large hydro CA 322 81,775 81,775 81,681 - - G.M. Shrum Hydroelectric Generation Facility Large hydro BC, Canada P206 38,741 38,741 38,696 - - Mica Hydroelectric Generation Facility Large hydro BC, Canada P210 1,787 1,787 1,785 - - Peace Canyon Hydroelectric Generation Facility Large hydro BC, Canada P211 692 692 - 691 - Revelstoke Hydroelectric Generation Facility Large hydro BC, Canada P212 31,609 31,609 - 31,572 - Seven Mile Hydroelectric Generation Facility Large hydro BC, Canada P213 429 429 - 429 - Rock Island (Chelan County PUD) Large hydro WA 6200 1,251 1,251 - 1,250 - Rocky Reach (Chelan County PUD) Large hydro WA 3883 491 491 490 - - Exchequer Hydro Large hydro CA 409 10,000 10,000 9,988 - - - #N/A - PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS Version: April 2024 Facility Name Fuel Type N/A N/A N/A N/A EIA ID Gross MWh Procured MWh Resold Net MWh Procured Adjusted Net MWh Procured GHG Emissions Factor (in MT CO2e/MWh) GHG Emissions (in MT CO2e) N/A - #N/A - #N/A #N/A - #N/A - END USES OTHER THAN RETAIL SALES MWh

CITY OF SANTA BARBARA

COUNCIL AGENDA REPORT
AGENDA DATE: December 10, 2024
TO: Mayor and Councilmembers
FROM: Community Development Department
SUBJECT: Appeal of Planning Commission’s Approval of a Hotel Project at 17– 21 West Montecito Street
RECOMMENDATION: That Council:

A. Consider the appeal of Steven A. Johnson of the Planning Commission’s approval of a Parking Modification, Development Plan, and Coastal Development Plan, and determination that the project is exempt from further environmental review under California Environmental Quality Act Guidelines Section 15332 (Infill Development), for the Hotel Project at 17–21 W Montecito Street; and
B. Direct staff to return to Council with a Decision and Findings Resolution reflecting the outcome of the appeal.

EXECUTIVE SUMMARY:

On October 3, 2024, the Planning Commission reviewed and approved a 16,508-squarefoot, 45-foot-tall, three-story hotel with 44 guest rooms, a 10,000-square-foot underground parking area, and a 3,459-square-foot roof deck at 17–21 W Montecito Street.

On October 7, 2024, an appeal of the Planning Commission’s approval was filed by Steven A. Johnson (Attachment 1). The issues being appealed relate to potential flood hazards associated with the proposed underground parking garage.

Staff’s recommendation is that the appeal be denied, and the Planning Commission’s approval be upheld because the project, as designed, is in conformance with the 2022 California Building Code and with federal and City regulated flood provisions.

Agenda Item No. 18
File Code No. 640.07
Council Agenda Report
Appeal of Planning Commission’s Approval of a Hotel Project at 17–21 West Montecito Street
December 10, 2024

Page 2 ends

DISCUSSION:

Proposed Project
The project proposes construction of a 16,508-square-foot, 45-foot-tall, three-story hotel with 44 guest rooms and a 10,000-square-foot underground parking area with 40 valet parking spaces and two accessible parking spaces. The project requires the merging of three parcels into a single 11,839-square-foot lot.

The project site is currently developed with two one-story buildings that would be demolished: the building at 17 W. Montecito is a retail store (currently for Ducati and Vespa), 19 W. Montecito is vacant (currently containing two large storage containers), and the building at 21 W. Montecito is vacant. The site is zoned HRC-2/SD-3 (Hotel and Related Commercial, Coastal Overlay) with a Local Coastal Plan Designation of Hotel & Related Commerce II / Medium High Residential (maximum 27 dwelling units per acre).

The project site is located in a Federal Emergency Management Agency (FEMA) regulated AE Special Flood Hazard Area (SFHA)1. The proposed design is compliant with FEMA’s definition of a “mixed-use” structure that has been reviewed and determined to be in compliance with FEMA Guidelines by FEMA Floodplain Management Specialist (Mitigation), Insurance Branch, FEMA Region 9, FEMA Building Sciences, and California Department of Water Resources, Division of Flood Management. The design of the mixed-use hotel over a basement is fully compliant with:
 (CFR) 44 CFR Part 60.3 Code of Federal Regulations
 ASCE/SEI 24-14 Design Flood Elevation (DFE) Criteria
 FEMA / NFIP Technical Bulletin 6 (TB-6) / January 2021 Exceptions  City Floodplain Ordinances
Planning Commission Review
On October 3, 2024, the Planning Commission reviewed and approved the proposed project. The Planning Commission approved the following discretionary applications in support of the project:

A. A Parking Modification to allow fewer than the required number of parking spaces (SBMC §28.90.100 and SBMC §28.92.110.A.1);
B. A Development Plan to allow the construction of approximately 11,255 square feet of net new nonresidential development (SBMC Chapter 28.85); and C. A Coastal Development Permit to allow the proposed development in the NonAppealable Jurisdiction of the City’s Coastal Zone (SBMC §28.44.060). 1 SFHAs are defined as the area that will be inundated by the flood event having a one-percent chance of being equaled or exceeded in any given year; also referred to as the 100-year flood.

Council Agenda Report
Appeal of Planning Commission’s Approval of a Hotel Project at 17–21 West Montecito Street
December 10, 2024

Page 3 ends

The Planning Commission staff report and resolution, including findings and conditions, are provided as Attachments 2 and 3, respectively.

Appeal Issues
On October 7, 2024, Steven A. Johnson filed an appeal of the project with four specific issues, all related to flooding. The appeal states that the project is: 1) not consistent with General Plan Land Use policy 5.1-35; 2) the Planning Commission approval was based on receiving incomplete information; 3) the City’s Flood Plain Administrator incorrectly confirmed that sub-grade parking is consistent with FEMA regulations; and 4) the development is not consistent with the principles of sound community planning. These are the only issues being challenged and before City Council.

Issue #1: The project is not consistent with General Plan Land Use Policy 5.1-35.

The project site is not located in any Shoreline Hazard Areas. Specifically, it is not located in Potential Shoreline Hazards Screening Area 6 (Inland Coastal Flooding Area).

Therefore, Coastal Land Use Plan Policy 5.1-35 is not applicable to this project and the issue at appeal is moot. Refer to Attachment 4 for the Shoreline Hazards Screening Areas Map.

Issue #2: The Planning Commission approval was based on incomplete information.

The staff report states that the Floodplain Administrator confirmed that sub-grade parking for the proposed hotel is allowed, but no reasoning is provided.

For floodplain management purposes, the National Flood Insurance Program (NFIP) Flood Insurance Manual considers buildings with both “non-residential” and “residential” uses to be “mixed-use buildings.” Fully engineered mixed-use buildings may be designed with below-grade parking areas per flood code regulations.

Habitable spaces in hotels, such as sleeping rooms, are considered as residential floor area (FEMA Technical Bulletin 6); non-residential areas are “common areas that serve non-habitable purposes such as parking, storage, offices, meeting rooms, swimming pools, and exercise facilities” (FEMA P-2037).

NFIP Flood Insurance Manual defines a mixed-use building as one in which the total floor area devoted to non-residential uses is 25 percent or more of the total floor area within the building. In this instance, the hotel’s non-residential areas (including parking garage) exceed 25 percent of the building floor area; therefore, the proposed hotel qualifies as a mixed-use building per flood code requirements.

The code criteria for mixed-use buildings are as follows:

Council Agenda Report
Appeal of Planning Commission’s Approval of a Hotel Project at 17–21 West Montecito Street
December 10, 2024

Page 4 ends

 FEMA / NFIP technical bulletin 6 (TB-6) / January 2021 Requirements for dry flood-proofed below-grade parking areas under nonresidential and mixed-use buildings  Two National Flood Insurance Program regulations

2.2 dry flood-proofed below-grade parking areas:
permitted under mixed-use buildings in Zone A.

The project complies with the code criteria because all hotel habitable spaces, such as sleeping rooms, are elevated one additional foot above FEMA’s required Base Flood Elevation (BFE), referred to as the Design Flood Elevation (DFE), and the one-story basement garage below the podium is professionally designed and engineered; used solely for parking cars; and is dry flood proofed. Dry flood-proofing is a combination of measures that make a structure and its utilities and equipment watertight with all elements substantially impermeable and with structural components having the capacity to resist flood loads.2
Issue #3: The hotel project at 101 Garden is similar; both hotels propose sub-grade parking in a flood zone. Staff misclassified both projects by asserting that parking basements are within the building. That is a novel interpretation, unsupported by any FEMA documents, practices by other jurisdictions, or technical studies provided by the applicant. To the contrary p. 3-10 of the 2024 Flood Insurance Manual says otherwise.

First and foremost, 101 Garden Street is a separate project and should not be considered as part of this appeal nor should that project be introduced into this project record.

FEMA P-2037 definition of non-residential specifically includes parking. This means that the basement garage floor area qualifies as non-residential floor area and should be included in the 25 percent area that counts toward the mixed-use definition.

Flood insurance definitions and standards found in the NFIP Flood Insurance Manual are different from building code compliance definitions and standards found in the NFIP Floodplain Management regulations.

Furthermore, the quoted section was taken from Table 4 of the NFIP Flood Insurance Manual and is specific only to “Residential Condominium Building” and NOT to this specific hotel project, which is defined as a “Mixed-Use Building”, as described under “Other Residential Building under the manual..” (Attachment 5) The City’s Flood Plain Administrator correctly confirmed that sub-grade parking is consistent with FEMA regulations.
2 Federal Emergency Management Agency (FEMA); National Flood Insurance Program (NFIP); American Society of Civil Engineers (ASCE) 24-14 and City Ordinances.

Council Agenda Report
Appeal of Planning Commission’s Approval of a Hotel Project at 17–21 West Montecito Street
December 10, 2024

Page 5 ends

Issue #4: Approval requires a finding that the development is “consistent with the principles of sound community planning.” Finding a parking basement as “within the building” is not consistent with the principles of sound community planning.

Basement parking is included in the building floor area in accordance with FEMA Floodplain Management Division.

Projects are considered consistent with the principles of sound community planning when they are consistent with the City Charter, Local Coastal Program, and applicable elements of the General Plan, including the Land Use Element, Conservation Element, Safety/Seismic Safety Element, Noise Element, and the General Plan Map.3 That said, the City’s General Plan alone contains hundreds of policies covering topics ranging from land use and housing to circulation, resource protection, safety, and noise; it is not reasonable to expect every development project to satisfy all General Plan policies. Should policies pose competing or incongruent objectives, a balance is sought to achieve the highest level of compliance possible.

In this case, applicable General Plan policies are found in the Land Use Element, the Environmental Resources Element and Conservation Element, the Historic Resources Element, and the Circulation Element. The proposed hotel development was found to be consistent with the applicable coastal and General Plan policies, as discussed in the Planning Commission Staff Report dated September 26, 2024, and documented in Planning Commission Resolution No. 003-24..

ENVIRONMENTAL REVIEW:

The project qualifies for an exemption from further environmental review under Section 15332 [In-fill Development Projects] of the California Environmental Quality Act (CEQA) Guidelines as discussed in the Planning Commission Staff Report dated September 26, 2024 (Attachment 2). CEQA Guidelines Section 15332 allows projects characterized as infill development to be categorically exempt from CEQA if the project meets all criteria listed under this exemption, and the project meets all criteria and none of the exceptions to categorical exemptions listed under CEQA Guidelines Section 15300.2 (a) through (f) apply.

CONCLUSION:

Staff recommends that Council deny the appeal thereby upholding the Planning Commission’s approval of the project, making the findings set forth in the Planning Commission Resolution and subject to the conditions of approval contained in the Planning Commission Resolution.
3 May 10, 1988, City Council adopted a list of policy documents to serve as the standard of review for sound community planning.

Council Agenda Report
Appeal of Planning Commission’s Approval of a Hotel Project at 17–21 West Montecito Street
December 10, 2024

Page 6 ends

Staff also recommends that Council direct staff to return to Council with a decision and findings resolution reflecting the outcome of the appeal.

ATTACHMENTS:

1. Appeal Letter from Steven Johnson Dated October 7, 2024

2. Planning Commission Staff Report Dated September 26, 2024

3. Planning Commission Resolution No. 003-24

4. Additional Applicable Policies

5. Page 3.10 of 2024 Flood Insurance Manual
PREPARED BY: Kelly Brodison, Associate Planner
Christina Dye, Chief Building Official
SUBMITTED BY: Elias Isaacson, Community Development Director APPROVED BY: Kelly McAdoo, City Administrator
ATTACHMENT 1

CITY OF SANTA BARBARA PLANNING COMMISSION
RESOLUTION NO. 012-24
17-21 W MONTECITO STREET

PARKING MODIFICATION, DEVELOPMENT PLAN,

AND COASTAL DEVELOPMENT PERMIT
OCTOBER 3, 2024
Assessor’s Parcel Number: 033-042-005, 006 and 007
Zoning Designation: HRC-2/S-D-3 (Hotel and Related Commerce/Coastal Overlay) Application Number: PLN2023-00147 Filing Date: June 12, 2023 Owner: Paul Uyesaka Revocable Trust 10/31/18
Applicant: Craig Minus
The proposed project involves construction of a 26,508-square-foot, 45-foot tall, three-story hotel with 44 guest rooms, a 10,000-square-foot underground parking area, and a 3,459-square-foot roof deck. The project also involves the merger of three parcels into a single 11,839-square-foot lot. The project site is currently developed with two one-story buildings that would be demolished. The building at 17 W. Montecito is a retail store (currently for Ducati and Vespa), the building at 21 W. Montecito is vacant, and 19 W. Montecito is vacant (currently contains two large storage containers).

WHEREAS, the Planning Commission has held the required public hearing on the above application, and the Applicant was present.

WHEREAS, 3 people appeared to speak and the following exhibits were presented for the record:

1. Staff Report with Attachments, September 26, 2024

2. Staff Memo dated October 3, 2024 RE: Historic Structures/Sites Report

3. Staff Memo dated October 3, 2024 RE: Moderate Cost Hotel Determination

4. Project Plans

5. Correspondence received:
a. Paul Uyesaka
b. Mitch Stark
c. Steven A. Johnson
d. Tyler Liddell, California Coastal Commission
e. Steven A. Johnson
NOW, THEREFORE BE IT RESOLVED that the City Planning Commission:

I. Approved the subject application, making the following findings and determinations:

A. ENVIRONMENTAL REVIEW (CEQA Guidelines)
ATTACHMENT 3
PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 2
The project qualifies for an exemption from further environmental review under CEQA Guidelines Section 15332, based on the City staff analysis in the Staff Report dated September 26, 2024.

B. PARKING MODIFICATION (SBMC §28.92.110)

1. The Parking Modification is consistent with the purposes and intent of the Zoning Ordinance (Title 28), which are to serve the public health, safety, comfort, convenience, and general welfare and to provide the economic and social advantages resulting from an orderly planned use of land resources, and to encourage, guide and provide a definite plan for the future growth and development of the City. The project will provide alternative transportation incentives with the visitor information program and transportation demand management program, as described in Section V.A.2 of the Staff Report dated September 26, 2024, and documented in the conditions of approval.

2. The Parking Modification will not cause an increase in the demand for parking space or loading space in the immediate area because the project is expected to meet the parking demand onsite based on the Parking Demand Analysis report (ATE, December 6, 2023), as described in Section V.A.2 of the Staff Report dated September 26, 2024.

C. DEVELOPMENT PLAN (SBMC §28.85.040)

1. The proposed development complies with all applicable provisions of the Zoning Ordinance related to use, setbacks, building height, parking, and nonresidential floor area, as described in Section V of the Staff Report dated September 26, 2024.

2. The proposed development is consistent with the principles of sound community planning because the hotel use is allowed in the zone, is consistent with the General Plan and Coastal Land Use Plan land use designation of Hotel & Related Commerce II, is compatible with the neighborhood, and is sensitive historic resources, as described in Section V and VI of the Staff Report dated September 26, 2024.

3. The proposed development will not have a significant adverse impact upon the community’s aesthetics or character in that the size, bulk and scale of the development is compatible with the neighborhood based on review of the Project Compatibility Analysis criteria found in SBMC §30.220.020.F by the Historic Landmarks Commission, as described in Section VIII of the Staff Report dated September 26, 2024.

4. The proposed development is consistent with the policies of the City of Santa Barbara Traffic Management Strategy (as approved by City Resolution No. 13-010 dated March 12, 2013, and amended per Resolution No. 20-042 dated June 23, 2020) as expressed in the allocation allowances specified in SBMC §28.85.050, Traffic Management Strategy, as described in Section VI of the Staff Report dated September 26, 2024.

D. COASTAL DEVELOPMENT PERMIT (SBMC §28.44.150)

1. The project is consistent with the policies of the California Coastal Act as described in Section VI of the Staff Report dated September 26, 2024.

2. The project is consistent with all applicable policies of the City’s Local Coastal Plan, all applicable implementing guidelines, and all applicable provisions of the Code because it meets the required parking demand, and is compatible with the surrounding neighborhood, as described in Section V, VI and VIII of the Staff Report dated September 26, 2024.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 3
II. Said approval is subject to the following conditions:

A. Order of Development. In order to accomplish the proposed development, the following steps shall occur in the order identified:

1. Obtain all required design review approvals.

2. Submit an application for and obtain a Building Permit (BLD) to demolish any structures / improvements and/or perform rough grading. Comply with condition E “Construction Implementation Requirements.”

3. Record any required documents (see Recorded Conditions Agreement section).

4. Permits.
a. Submit an application for and obtain a Building Permit (BLD) for construction of approved development and complete said development.
b. Submit an application for and obtain a Public Works Permit (PBW) for all required public improvements and complete said improvements.

Details on implementation of these steps are provided throughout the conditions of approval.

B. Recorded Conditions Agreement. The Owner shall execute a written instrument, which shall be prepared by Planning staff, reviewed as to form and content by the City Attorney and Community Development Director, recorded in the Office of the County Recorder, and shall include the following:

1. Approved Development. The development of the Real Property approved by the Planning Commission on September 12, 2024, is limited to the construction of a three-story hotel with 44-guestrooms, roof deck, and underground parking, as described in the Applicant Letter dated March 15, 2024, and as shown on the plans signed by the chairperson of the Planning Commission on said date and on file at the City of Santa Barbara.

2. Uninterrupted Water Flow. The Owner shall allow for the continuation of any historic flow of water onto the Real Property including, but not limited to, swales, natural watercourses, conduits and any access road, as appropriate.

3. Recreational Vehicle Storage Prohibition. No recreational vehicles, boats, or trailers shall be stored on the Real Property.

4. Landscape Plan Compliance. The Owner shall comply with the Landscape Plan approved by the Historic Landmarks Commission (HLC). Such plan shall not be modified unless prior written approval is obtained from the HLC. The landscaping on the Real Property shall be provided and maintained in accordance with said landscape plan, including any tree protection measures. If said landscaping is removed for any reason without approval by the HLC, the owner is responsible for its immediate replacement.

5. Storm Water Pollution Control and Drainage Systems Maintenance. Owner shall maintain the drainage system and storm water pollution control devices in a functioning state and in accordance with the Storm Water BMP Guidance Manual and Operations and Maintenance Procedure Plan approved by the Creeks Division. Should any of the project’s surface or subsurface drainage structures or storm water pollution control methods fail to capture, infiltrate, and/or treat water, or result in increased erosion, the Owner shall be PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 4
responsible for any necessary repairs to the system and restoration of the eroded area.

Should repairs or restoration become necessary, prior to the commencement of such repair or restoration work, the Owner shall submit a repair and restoration plan to the Community Development Director to determine if an amendment or a new Building Permit and Coastal Development Permit is required to authorize such work. The Owner is responsible for the adequacy of any project-related drainage facilities and for the continued maintenance thereof in a manner that will preclude any hazard to life, health, or damage to the Real Property or any adjoining property.

6. Valet Operations:
a. Valet pick up/drop off, maneuvering, and parking is only allowed on-site and cannot interfere with any right-of-way or City-owned parking facilities. b. Areas Available for Parking. All parking areas and access thereto shall be kept open and available in the manner in which it was designed and permitted. c. Accessible Parking Facilities. Valet operators are required to keep all accessible parking spaces and associated access aisles unobstructed and available for parking for individuals with disabilities at all times.
d. Parking Attendant. Hotel shall always have a parking attendant on duty, provide sufficient staff and facilities to ensure that automobiles are moved for parking promptly. If, at any time during the operations of the valet facility is unable to satisfy the parking demand, and queueing or double-parking occurs, the operation shall be temporarily closed until the demand can be properly handled.

7. Areas Available for Parking. All parking areas and access thereto shall be kept open and available in the manner in which it was designed and permitted.

8. Gates. Any gates that have the potential to block access to any designated commercial space shall be locked in the open position during business hours.

C. Design Review. The project, including public improvements, is subject to the review and approval of the Historic Landmarks Commission (HLC). The HLC shall not grant project design approval until the following Planning Commission land use conditions have been satisfied.

1. Backflow Device. The backflow devices for fire sprinklers, pools, spas and/or irrigation systems shall be provided in a location screened from public view or included in the exterior wall of the building, as approved by the HLC.

2. Location of Dry Utilities. Dry utilities (e.g. above-ground cabinets) shall be placed on private property unless deemed infeasible for engineering reasons. If dry utilities must be placed in the public right-of-way, they shall painted “Malaga Green,” and if feasible, they shall be screened as approved by HLC.

3. Trash Enclosure Provision. A trash enclosure with adequate area for recycling containers (an area that allows for a minimum of 50 percent of the total capacity for recycling containers) shall be provided on the Real Property and screened from view from surrounding properties and the street.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 5
Dumpsters and containers with a capacity of 1.5 cubic yards or more shall not be placed within five (5) feet of combustible walls, openings, or roofs, unless protected with fire sprinklers.

D. Requirements Prior to Permit Issuance. The Owner shall submit the following, or evidence of completion of the following, for review and approval by the Department listed below prior to the issuance of any permit for the project. Some of these conditions may be waived for demolition or rough grading permits, at the discretion of the department listed. Please note that these conditions are in addition to the standard submittal requirements for each department.

1. Public Works Department.
a. Approved Public Improvement Plans. Public Improvement Plans as identified in condition D.1.f. “Montecito Street Public Improvements” shall be submitted to the Public Works Department for review and approval. Upon acceptance of completed public improvement plans, a Building permit may be issued b. Parking Plan. Provide a detailed description of valet parking operations, which shall be subject to review and approval by the Public Works Director. Include a copy of the approved Plan on the plans submitted for a building permit. c. Water Rights Assignment Agreement. The Owner shall assign to the City of Santa Barbara the exclusive right to extract ground water from under the Real Property in an Agreement Assigning Water Extraction Rights. Engineering Division Staff prepares said agreement for the Owner’s signature. d. Montecito Street Public Improvements. The Owner shall submit C-1 public improvement or Public Works plans for construction of improvements along the property frontage on Montecito Street and “informally known as Rey Road”. Plans shall be submitted separately from plans submitted for a Building Permit and shall be prepared by a licensed civil engineer registered in the State of California. As determined by the Public Works Department, the improvements shall include new and/or remove and replace to City standards, the following: 80 linear feet of sidewalk consisting of a 6” curb, 4’ furnishing zone (parkway and bicycle parking), 6’ through zone, and 1’6” frontage zone (private property with a limitation on site/retaining wall maximum height of 42”). Driveway apron modified to meet Title 24 requirements with a maximum width of 22 feet, 80 linear feet of curb and gutter, and access ramp per approved design. Any work in the public right-of-way requires a Public Works Permit.
e. Lot Merger Required. The Real Property known as APNs 033-042-005, 033-042- 006 and 033-042-007 shall be merged into one (1) lot, following the procedure in Santa Barbara Municipal Code Chapter 27.30.
f. Haul Routes Require Separate Permit. Apply for a Public Works permit to establish the haul route for all construction-related trucks with a gross vehicle weight rating of three tons or more entering or exiting the site. g. Construction-Related Truck Trips. Construction-related truck trips for trucks with a gross vehicle weight rating of three tons or more shall not be scheduled PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 6
during peak hours (7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.) in order to help reduce truck traffic on adjacent streets and roadways. h. Encroachment Permits. Any encroachment or other permits from the City or other jurisdictions (State, Flood Control, County, etc.) for the construction of improvements (including any required appurtenances) within their rights of way or easements shall be obtained by the Owner.

2. Community Development Department.
a. Recordation of Agreements. The Owner shall provide evidence of recordation of the written instrument that includes all of the Recorded Conditions identified in condition B “Recorded Conditions Agreement” to the Community Development Department prior to issuance of any building permits.
b. Drainage and Water Quality. The project is required to comply with Tier 3 of the Storm Water BMP Guidance Manual, pursuant to Santa Barbara Municipal Code Chapter 22.87 (treatment, rate and volume). Project plans for grading, drainage, stormwater facilities and treatment methods, and project development, shall be subject to review and approval by the City Building Division and Public Works Department. Sufficient engineered design and adequate measures shall be employed to ensure that no unpermitted construction-related or long-term effects from increased runoff, erosion and sedimentation, urban water pollutants (including, but not limited to trash, hydrocarbons, fertilizers, bacteria, etc.), or groundwater pollutants would result from the project.

For any proprietary treatment devices that are proposed as part of the project’s final Storm Water Management Plan, the Owner shall provide an Operations and Maintenance Procedure Plan consistent with the manufacturer’s specifications (describing schedules and estimated annual maintenance costs for pollution absorbing filter media replacement, sediment removal, etc.). The Plan shall be reviewed and approved by the Creeks Division for consistency with the Storm Water BMP Guidance Manual and the manufacturer’s specifications.

After certificate of occupancy is granted, any proprietary treatment devices installed will be subject to water quality testing by City Staff to ensure they are performing as designed and are operating in compliance with the City’s Storm Water MS4 Permit.
c. Archaeological Monitoring Contract. Submit a contract with an archaeologist from the most current City Qualified Archaeologists List for monitoring during all ground-disturbing activities associated with the project, including, but not limited to, grading, excavation, trenching vegetation or paving removal and ground clearance in the areas identified in the Phase 1 Archaeological Resources Report prepared for this site by Samantha Murray, dated January 24. The contract shall be subject to the review and approval of the Environmental Analyst.

The archaeologist’s monitoring contract shall include the provisions identified in condition D.2.d “Requirement for Archaeological Resources” below.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 7
d. Requirement for Archaeological Resources. The following information shall be printed on the grading plans:

If archaeological resources are encountered or suspected, work shall be halted or redirected immediately, and the Planning Division shall be notified. The archaeologist shall assess the nature, extent, and significance of any discoveries and develop appropriate management recommendations for archaeological resource treatment, which may include, but are not limited to, redirection of grading and/or excavation activities, consultation and/or monitoring with a Barbareño Chumash representative from the most current City Qualified Barbareño Chumash Site Monitors List, etc.

If the discovery consists of possible human remains, the Santa Barbara County Coroner shall be contacted immediately. If the Coroner determines that the remains are Native American, the Coroner shall contact the California Native American Heritage Commission. A Barbareño Chumash representative from the most current City Qualified Barbareño Chumash Site Monitors List shall be retained to monitor all further subsurface disturbance in the area of the find. Work in the area may only proceed after the Planning Division grants authorization.

If the discovery consists of possible prehistoric or Native American artifacts or materials, a Barbareño Chumash representative from the most current City Qualified Barbareño Chumash Site Monitors List shall be retained to monitor all further subsurface disturbance in the area of the find. Work in the area may only proceed after the Planning Division grants authorization. e. Contractor and Subcontractor Notification. The Owner shall notify in writing all contractors and subcontractors of the site rules, restrictions, and Conditions of Approval. Submit a draft copy of the notice to the Planning Division for review and approval.
f. Letter of Commitment for Neighborhood Notification Prior to Construction.

The Owner shall submit to the Planning Division a letter of commitment to provide the written notice specified in condition E.1 “Neighborhood Notification Prior to Construction” below. The language of the notice and the mailing list shall be reviewed and approved by the Planning Division prior to being distributed. An affidavit signed by the person(s) who compiled the mailing list shall be submitted to the Planning Division.
g. Letter of Commitment for Pre-Construction Conference. The Owner shall submit to the Planning Division a letter of commitment to hold the Pre-Construction Conference identified in condition E.2 “Pre-Construction Conference” prior to disturbing any part of the project site for any reason. h. Design Review Requirements. Plans shall show all design, landscape and tree protection elements, as approved by the appropriate design review board and as outlined in Section C “Design Review,” and all elements/specifications shall be implemented on-site.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 8
i. Air Quality Requirements. Reproduce the Air Quality Control District letter dated January 3, 2024, on the plans prior to building permit issuance. j. Conditions on Plans/Signatures. The final Resolution shall be provided on a full size drawing sheet as part of the drawing sets. Each condition shall have a sheet and/or note reference to verify condition compliance. If the condition relates to a document submittal, indicate the status of the submittal (e.g., Final Map submitted to Public Works Department for review). The following statement shall be signed prior to issuance of and permits: The undersigned have read and understand the required conditions, and agree to abide by any and all conditions which are their usual and customary responsibility to perform, and which are within their authority to perform.

Signed:
_____________________________________________________________ Property Owner Date
_____________________________________________________________ _____________________________________________________________ Property Owner Date
E. Construction Implementation Requirements. All of these construction requirements shall be carried out in the field by the Owner and/or Contractor for the duration of the project construction, including demolition and grading.

1. Neighborhood Notification Prior to Construction. At least twenty (20) days prior to commencement of construction, the contractor shall provide written notice to all property owners, businesses, and residents within 300 feet of the project area. The notice shall contain a description of the project, the construction schedule, including days and hours of construction, the name and phone number of the (Contractor(s), site rules and Conditions of Approval pertaining to construction activities, and any additional information that will assist Building Inspectors, Police Officers and the public in addressing problems that may arise during construction.

2. Pre-Construction Conference. Not less than 10 days or more than 20 days prior to commencement of construction, a conference to review site conditions, construction schedule, construction conditions, and environmental monitoring requirements, shall be held by the General Contractor. The conference shall include representatives from the Public Works Department Engineering and Transportation Divisions, Community Development Department Building and Planning Divisions, the Property Owner, (Archaeologist, Architect, Arborist, Landscape Architect, Biologist, Geologist, Project Engineer, Project Environmental Coordinator, Mitigation Monitors), Contractor and each Subcontractor.

3. Construction Contact Sign. Immediately after Building permit issuance, signage shall be posted at the points of entry to the site that list the contractor(s) (name, contractor(s) telephone number(s), construction work hours, site rules, and construction-related conditions, to assist Building Inspectors and Police Officers in the enforcement of the PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 9
conditions of approval. The font size shall be a minimum of 0.5 inches in height. Said sign shall not exceed six feet in height from the ground if it is free-standing or placed on a fence. It shall not exceed 24 square feet if in a multi-family or commercial zone or six square feet if in a single-family zone.

4. Construction Hours. Construction (including preparation for construction work) shall only be permitted Monday through Friday between the hours of 7:00 a.m. and 5:00 p.m. and Saturdays between the hours of 9:00 a.m. and 4:00 p.m., excluding the following holidays:

New Year’s Day January 1st*
Martin Luther King, Jr. Day 3rd Monday in January
Presidents’ Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4th*
Labor Day 1st Monday in September
Thanksgiving Day 4th Thursday in November
Following Thanksgiving Day Friday following Thanksgiving Day Christmas Day December 25th*
*When a holiday falls on a Saturday or Sunday, the preceding Friday or following Monday, respectively, shall be observed as a legal holiday.

When, based on required construction type or other appropriate reasons, it is necessary to do work outside the allowed construction hours, contractor shall contact the City to request a waiver from the above construction hours, using the procedure outlined in Santa Barbara Municipal Code §9.16.015 Construction Work at Night. Contractor shall notify all residents within 300 feet of the parcel of intent to carry out said construction a minimum of 48 hours prior to said construction. Said notification shall include what the work includes, the reason for the work, the duration of the proposed work and a contact number.

5. Construction Storage/Staging. Construction vehicle/ equipment/ materials storage and staging shall be done on-site. No parking or storage shall be permitted within the public right-of-way, unless specifically permitted by the Public Works Director with a Public Works permit.

6. Construction Parking. During construction, free parking spaces for construction workers shall be provided on-site or off-site in a location subject to the approval of the Public Works Director.

7. Nesting Birds. Birds and their eggs nesting on or near the project site are protected under the Migratory Bird Treaty Act and pursuing, hunting, taking, capturing, killing, or attempt to do any of the above is a violation of federal and state regulations. No trimming or removing brush or trees shall occur if nesting birds are found in the vegetation. All care should be taken not to disturb the nest(s). Removal or trimming may only occur after the young have fledged from the nets(s).

8. Air Quality and Dust Control. The conditions listed in the Air Quality Control District letter dated January 3, 2024, shall be shown on grading and building plans and shall be adhered to throughout grading, hauling, and construction activities.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 10

9. Archaeological Monitoring. Onsite monitoring by a City-Qualified Archaeologist and as appropriate, a City-qualified Barbareño Chumash Site Monitor, is required for all grading, excavation, trenching, vegetation or paving removal, ground clearance, and site preparation that involves earthmoving operations.

F. Prior to Certificate of Occupancy. Prior to issuance of the Certificate of Occupancy, the Owner of the Real Property shall complete the following:

1. Repair Damaged Public Improvements. Repair any public improvements (curbs, gutters, sidewalks, roadways, etc.) or property damaged by construction subject to the review and approval of the Public Works Department per SBMC §22.60. Where tree roots are the cause of the damage, the roots shall be pruned under the direction of a qualified arborist.

2. Complete Public Improvements. Public improvements, as shown in the public improvement plans or building plans, shall be completed.

3. Archaeological Monitoring Report. A final report on the results of the archaeological monitoring shall be submitted to the Planning Division within 180 days of completion of the monitoring or prior to the issuance of the Certificate of Occupancy or Final Inspection, whichever is earlier.

4. New Construction Photographs. Photographs of the new construction, taken from the same locations as those taken of the story poles prior to project approval, shall be taken, attached to 8 ½ x 11” board and submitted to the Planning Division.

G. General Conditions.

1. Compliance with Requirements. All requirements of the City of Santa Barbara and any other applicable requirements of any law or agency of the State and/or any government entity or district shall be met. This includes, but is not limited to, the Endangered Species Act of 1973 [ESA] and any amendments thereto (16 U.S.C. § 1531 et seq.), the 1979 Air Quality Attainment Plan, and the California Code of Regulations.

2. Moderate Cost Hotel Provision. The project shall be maintained as a moderate cost hotel in accordance with Coastal Act Section 30213 and Local Coastal Program Coastal Land Use Plan Policy 3.2-12 Lower Cost Visitor and Recreational Facilities. No changes shall be allowed that would result in a change to its status as a moderate (lower cost) accommodation, such as the addition of amenities that are typically associated with a luxury hotel (e.g., spa/wellness center, pool, on-site laundry facilities, multiple full-service restaurants, or an increase of 10% or more of the identified 20 necessary hotel employees).

Any proposed change may only be approved through a substantial conformance determination or Amendment to the Coastal Development Permit, the level of which review shall be determined by the Community Development Director.

3. Approval Limitations.
a. The conditions of this approval supersede all conflicting notations, specifications, dimensions, and the like which may be shown on submitted plans. b. All buildings, roadways, parking areas and other features shall be located substantially as shown on the plans approved by the Planning Commission.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 11
c. Any deviations from the project description, approved plans or conditions must be reviewed and approved by the City, in accordance with the Planning Commission Guidelines. Deviations may require changes to the permit and/or further environmental review. Deviations without the above-described approval will constitute a violation of permit approval.

4. Site Maintenance. The existing site/structure(s) shall be maintained and secured. Any landscaping shall be watered and maintained until demolition occurs.

5. Litigation Indemnification Agreement. In the event the Planning Commission approval of the Project is appealed to the City Council, Applicant/Owner hereby agrees to defend the City, its officers, employees, agents, consultants and independent contractors (“City’s Agents”) from any third party legal challenge to the City Council’s denial of the appeal and approval of the Project, including, but not limited to, challenges filed pursuant to the California Environmental Quality Act (collectively “Claims”). Applicant/Owner further agrees to indemnify and hold harmless the City and the City’s Agents from any award of attorney fees or court costs made in connection with any Claim.

Applicant/Owner shall execute a written agreement, in a form approved by the City Attorney, evidencing the foregoing commitments of defense and indemnification within thirty (30) days of being notified of a lawsuit regarding the Project. These commitments of defense and indemnification are material conditions of the approval of the Project. If Applicant/Owner fails to execute the required defense and indemnification agreement within the time allotted, the Project approval shall become null and void absent subsequent acceptance of the agreement by the City, which acceptance shall be within the City’s sole and absolute discretion. Nothing contained in this condition shall prevent the City or the City’s Agents from independently defending any Claim. If the City or the City’s Agents decide to independently defend a Claim, the City and the City’s Agents shall bear their own attorney fees, expenses, and costs of that independent defense.

6. Transportation Demand Management. The following alternative mode incentives shall be incorporated into the project to reduce traffic impacts caused by the project. Owner shall be responsible for ensuring that all tenants comply with the provisions of the approved Transportation Demand Management (TDM) Plan.
a. TDM Administrator. The Owner shall appoint a TDM Administrator responsible for the alternative mode incentives. The TDM Administrator shall contract with Traffic Solutions or successor agency for training and assistance in administrating their program.
b. Bus Passes. The Owner and/or all employers shall contact the Metropolitan Transit District (MTD) to purchase bus passes or the equivalent for their employees. These passes shall be provided free of charge to employees who request them for travel to and from work. Notice of the free passes shall be provided to existing employees and new employees when they are hired. A copy of any
agreements/correspondence with MTD shall be provided to the Public Works Director prior to issuance of the Certificate of Occupancy for the project.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 12
c. Bus Routes and Schedules Posted. Notice of MTD bus routes and schedules shall be placed and maintained up-to-date in a central (public) location accessible to employees.
d. Ride-Sharing Program. Employees shall be made aware of the Ride-Sharing Program or similar successor programs administered by Traffic Solutions or successor agency. The Owner and/or all employers shall have all employees registered semi-annually in the Ride-Sharing Program and shall make every effort to encourage participation in the program.
e. Bicycle Parking. 6 bicycle parking spaces shall be provided, including 4 uncovered spaces in City right of way, and 3 bicycle lockers. f. Guaranteed Ride Home. In the event of an emergency or work requirement that interferes with the normal transportation arrangement of any employee using mass transportation, a carpool, or a vanpool to get to work, the Owner or employer shall provide cab fare, a company car, or other means to guarantee a free ride home. g. Visitor Information Program. A Visitor Information Program shall be prepared and implemented, subject to review and approval by the Public Works Director.

The program shall include, but not be limited to:
(1) Provide links to alternative transportation sites on the company website. (2) Provide mail information to visitors (prior to them coming) regarding alternative transportation available in Santa Barbara.
(3) A means of providing train, bus and airline schedules and maps to prospective hotel guests.
(4) A means of providing hotel guests with information on alternative transportation modes, schedules, and maps of access to the Central Business District, beach area and other local and regional points of interest. In addition, the hotel operator shall contact the Metropolitan Transit District to purchase bus and/or shuttle passes or tokens for hotel guests. Explicit notice of the free passes shall be provided to hotel guests upon arrival, and these passes shall be available to any guests who request them. (5) Advertisement for and solicitation of meetings and other events which includes explanation of the City's clean air and energy reduction goals and an explanation of the benefits of using alternative transportation modes. (6) A means of coordinating special events with the City so that appropriate traffic controls, rerouting, and timing of events can be achieved.

7. Recyclable Material Use and Collection for Hotels. Hotel operators shall encourage guests to recycle by using recyclable materials, and providing sufficient and appropriate receptacles, such as recycling containers, in each room. Recyclable material and green waste collection and pick-up areas shall be provided on-site for the hotel operations. A minimum of 50 percent of the area devoted to holding trash for the project shall be used for recycling purposes.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 13

8. Recyclable Material Use and Collection for Restaurants. Restaurant operators shall encourage guests to recycle by using recyclable materials, and providing sufficient and appropriate receptacles, such as recycling containers. Recyclable material (and green waste) collection and pick-up areas shall be provided on-site for the restaurant operations.

A minimum of 50 percent of the area devoted to holding trash for the project shall be used for recycling purposes.

9. BMP Training. Training on the implementation of Best Management Practices (BMPs) shall be provided to every employee by the property owner/management in order to prevent or reduce the discharge of pollutants to storm water from buildings and ground maintenance. The training shall include using good housekeeping practices, preventive maintenance and spill prevention and control at outdoor loading/ unloading areas in order to keep debris from entering the storm water collection system.

III. Said approval is subject to the following time Limits:

A. The Planning Commission action approving the Coastal Development Permit shall expire two (2) years from the date of final action upon the application, per Santa Barbara Municipal Code §28.44.230, unless:

1. Otherwise explicitly modified by conditions of approval for the coastal development permit.

2. A Building permit for the work authorized by the coastal development permit is issued prior to the expiration date of the approval.

3. The Community Development Director grants an extension of the coastal development permit approval. The Community Development Director may grant up to three (3) oneyear extensions of the coastal development permit approval. Each extension may be granted upon the Director finding that: (i) the development continues to conform to the Local Coastal Program, (ii) the applicant has demonstrated due diligence in completing the development, and (iii) there are no changed circumstances that affect the consistency of the development with the General Plan or any other applicable ordinances, resolutions, or other laws.

PLANNING COMMISSION RESOLUTION NO. 012–24
17-21 W MONTECITO STREET
OCTOBER 3, 2024
PAGE 14
The motions were passed and adopted on the 3rd day of October 2024 by the Planning Commission of the City of Santa Barbara, by the following vote:

MOTION 1: Approve the Parking Modification and Environmental Review.

AYES: 6 NOES: ABSTAIN: ABSENT: 1 (Wiscomb)
MOTION 2: Approve the Coastal Development Permit.

AYES: 4 NOES: 2 (Baucke and Boss) ABSTAIN: ABSENT: 1 (Wiscomb) MOTION 3: Approve the Development Plan.

AYES: 6 NOES: ABSTAIN: ABSENT: 1 (Wiscomb)
I hereby certify that this Resolution correctly reflects the action taken by the City of Santa Barbara Planning Commission at its meeting of the above date.
_______________________________________________ ____________________________ Kira Esparza, Administrative Assistant Date
PLEASE BE ADVISED:

THIS ACTION OF THE PLANNING COMMISSION CAN BE APPEALED TO THE CITY COUNCIL WITHIN TEN (10) CALENDAR DAYS AFTER THE DATE THE ACTION WAS TAKEN BY THE PLANNING COMMISSION.

ATTACHMENT 4
Additional Applicable Policies
17-21 W Montecito Street
General Plan
Environmental Resources Element
ER4. Incorporation of Adaptation in Development. New public and private development or substantial redevelopment or reuse projects shall estimate the useful life of proposed structures, and, in conjunction with available information about established hazard potential attributable to climate change, incorporate adaptation measures in the design, siting and location of the structures.

Conservation Element, Drainage and Flood Control

1.0 The City shall participate in the Federal Flood Insurance Program so that property owners may receive disaster assistance.

2.0 Floodplain management programs shall be implemented through the Building Officer of the Division of Land Use Controls, and the Flood Control Division.

Circulation Element

16.3.5 Require structures located in designated flood hazard areas to comply with local, State, and Federal building and safety standards.

Safety Element
S46. Development in Flood Hazard Areas. The potential for flood-related impacts to health, safety, and property may be reduced by limiting development in flood-prone areas. New development or redevelopment located within a designated 100-year floodplain shall be required to implement appropriate site and structure designs consistent with regulatory requirements that minimize the potential for flood-related damage, and shall not result in a substantial increase in downstream flooding hazards.

Coastal Land Use Plan
Policy 5.1-35 Development Standards for Potential Shoreline Hazards Screening Area 6 (Inland Coastal Flooding Area) on the Interim Shoreline Hazards Screening Areas Map. New development and substantial redevelopment shall:

A. Avoid high flood hazards unless determined to be infeasible or more damaging to coastal resources;
B. Where avoidance of high flood hazards cannot be achieved, minimize flood risk by increasing elevation of structures, restricting basements or habitable floor area below grade, restricting grading, restricting fencing or yard enclosures that cause water to pond, and/or utilizing flood proof materials consistent with local building requirements; and
C. Be designed to assure stability and structural integrity and neither create nor contribute significantly to downstream flooding, erosion, geologic instability, or destruction of the site or surrounding area over the expected life of the development, factoring in the effects of sea level rise.

Figure 5.1-1 Interim Shoreline Hazards Screening Areas Map (excerpt) ATTACHMENT 5
Appeal of 21 W Montecito project, PLN2023-00147
The project suffers from numerous defects:

1. The design of the driveway ramp allows incursion of floodwater into the basement.

2. The building is residential; sub-grade parking under residential is not allowed at this site.

3. There is no designated floodway for Mission Creek. As such, 44 CFR 60.3 c (10) requires an engineering analysis to be prepared for the project.

No such analysis was prepared.

4. ASCE 24 requires an investigation of areas suspected of being subject to flash floods.

No such investigation was done.

Details provided on following pages.

Steven A. Johnson
Nov 30, 2024

1. The design of the driveway ramp allows incursion of floodwater into the basement.

Facts agreed to by both staff and appellant:

Governing standard: the more restrictive of
SBMC 22.24, ASCE 24, 44 CFR Parts 59 and 60, CBC
ASCE 24 classifies hotels as residential.

The project is a hotel, as described by:
- project plans
- applicant letter
- staff report
- DFE
Sub-grade parking is not allowed under residential buildings in flood zones (all standards).

Staff’s position: ANALYSIS
Staff verbally implied (at the Oct 3 PC review) that the building does not satisfy the test to be considered “other residential”. Staff argues that for the combined hotel plus parking, more than 25% of the floor area is nonresidential.

But staff disregarded the definition from FEMA Technical Bulletin 6 (2021) page 3:
“Residential building: Building designated for habitation. Ancillary areas of residential buildings that serve only residents are residential ancillary areas and include laundry facilities, storage rooms, mail rooms, recreational rooms, parking garages, and exercise facilities.”
Further consider FEMA P-2037 (2019) Section 1.7:
“From a floodplain management perspective, buildings with multiple dwelling units and ancillary use areas that support the dwelling units are not considered mixed-use buildings, so the entire building is considered residential.”
Please also note the emails exchanged with Anntonette Duncan.

From: Duncan, Anntonette@DWR [email protected] Subject: RE: Other Residential Building
Date: March 1, 2024 at 2:46 PM
To: Steve Johnson [email protected]
You don't often get email from [email protected]. Learn why this is important Good a&ernoon,
You are correct a basement is not allowed in a residen5al structure that is located in a flood zone.

Here are some helpful guidance documents:
https://content.govdelivery.com/attachments/USDHSFEMA/2020/06/24/file_attach ments/1481529/16-J-0218_Multi-FamilyGuidance_06222020.pdf (refer to pg. 48 for Other Residential Building)
https://www.fema.gov/sites/default/files/documents/fema_technical-bulletin-6_1- 2021.pdf
Please let me know if you have addi5onal ques5ons.

Thank you,
Anntone&e Duncan, P.E.

Division of Flood Management
CA Department of Water Resources
916.699.8398
From: Steve Johnson <[email protected]>
Sent: Friday, March 1, 2024 11:13 AM
To: Duncan, AnntoneZe@DWR <[email protected]> Subject: Other Residen5al Building
Can you assist?
My understanding is that a residen5al structure with a basement is not allowed in a flood zone.

I believe this is also true for an "Other Residen5al Building”.

CFR 44 Chapter 1 Subchapter B Part 59 Subpart A 59.1 Defini&ons Other residential building means a residential building that is designed for use as a From: Duncan, Anntonette@DWR [email protected] Subject: RE: Other Residential Building
Date: November 14, 2024 at 3:26 PM
To: Steve Johnson [email protected]
Good afternoon Steve,
You are correct an apartment is considered residen.al and the parking garage under it does not make it mix use.

Anntonette Duncan, P.E.

Division of Flood Management
CA Department of Water Resources
916.699.8398
From: Steve Johnson <[email protected]>
Sent: Monday, November 11, 2024 5:42 PM
To: Duncan, AnntoneKe@DWR <[email protected]> Subject: Re: Other Residen.al Building
On Mar 1, 2024, at 2:46 PM, Duncan, Anntonette@DWR
<[email protected]> wrote:

Good aRernoon,
You are correct a basement is not allowed in a residen.al structure that is located in a flood zone.

Here are some helpful guidance documents:
https://content.govdelivery.com/attachments/USDHSFEMA/2020/06/24/ file_attachments/1481529/16-J-0218_MultiFamilyGuidance_06222020.pdf (refer to pg. 48 for Other Residential Building)
https://www.fema.gov/sites/default/files/documents/fema_technicalbulletin-6_1-2021.pdf Please let me know if you have addi.onal ques.ons.

Ms. Duncan,
30 Table 2: Flooding Sources Included in this FIS Report, continued Flooding Source Community Downstream Limit Upstream Limit HUC-8 SubBasin(s)
Length (mi) (streams or
coastlines)
Area (mi2)
(estuaries
or ponding)
Floodway
(Y/N)
Zone
shown on
FIRM
Date of
Analysis
Las Positas Creek
Santa Barbara, City of; Santa Barbara County, Unincorporated Areas Confluence with Arroyo Burro Creek
Approximately 300 feet upstream of Modoc Road
18060013 0.7 Y AE 2005
Las Vegas Creek
Goleta, City of; Santa Barbara County, Unincorporated Areas Confluence with San Pedro Creek
Approximately 55 feet upstream of La Goleta Road
18060013 1.3 Y AE 1973
Maria Ygnacia Creek
Goleta, City of; Santa Barbara County, Unincorporated Areas Confluence with Atascadero Creek
Approximately 1,030 feet upstream of confluence of East Fork Maria Ygnacia Creek 18060013 3.2 Y AE 2000
Mission Creek Santa Barbara, City of At mouth
Approximately 30 feet upstream of Carillo Street
18060013 1.2 N AH 2011
Mission Creek
Santa Barbara, City of; Santa Barbara County, Unincorporated Areas Approximately 130feet upstream of West Arrellaga Street Approximately 2,143 feet upstream of Los Olivos Street
18060013 3.3 Y AE, AO 2011
Mission Creek
Santa Barbara, City of; Santa Barbara County, Unincorporated Areas Not provided Not provided 18060013 0.6 N A 2011
Mission Creek Overflow Santa Barbara, City of Confluence with Mission Creek Divergence from Mission Creek 18060013 0.6 N AH 2011Montecito Creek Santa Barbara County, Unincorporated Areas Confluence with Pacific Ocean At Los Padres National Forest boundary 18060013 3.1 Y AE 1973Northridge Creek Santa Barbara, City of Confluence with Arroyo burro Creek Approximately 2,400 feet upstream of Foothill Road 18060013 0.6 Y AE 2005Northridge Creek Santa Barbara, City of; Santa Barbara County, Unincorporated Areas Not provided Not provided 18060013 0.2 N A 2005
44 CFR Part 60.3 c (10)
Require until a regulatory floodway is designated,
that no new construction, substantial improvements,
or other development (including fill) shall be
permitted within Zones A1-30 and AE on the
community's FIRM, unless it is demonstrated that
the cumulative effect of the proposed development,
when combined with all other existing and
anticipated development, will not increase the water
surface elevation of the base flood more than one
foot at any point within the community.

High Risk Flood Hazard Area
From ASCE 24 page 3:

High Risk Flood Hazard Areas include Flash Flood areas
Agenda Item No. 19
File Code No. 120.04

← All documents from this meeting