3.1.1. Hours during single daily shift - ten (10) hours per day
JOB CLASSIFICATION STRAIGHT OVERTIME DOUBLE
TIME TIME
Technical Advisor/ PM $190.00 $240.00 $240.00
Safety Coordinator $135.00 $170.00 $170.00
Millwright Supervisor $160.00 $220.00 $220.00
Millwright Foreman $150.00 $210.00 $210.00
Millwright Journeyman $128.00 $168.00 $207.00
Specialty Technician $200.00 $250.00 $250.00
3.1.2. Hours outside of single daily shift- in excess (10) hours per day
JOB CLASSIFICATION STRAIGHT OVERTIME DOUBLE
TIME TIME
Technical Advisor/ PM $192.00 $242.00 $242.00
Safety Coordinator $137.00 $172.00 $172.00
Millwright Supervisor $162.00 $222.00 $222.00
Millwright Foreman $152.00 $212.00 $212.00
Millwright Journeyman $130.00 $170.00 $209.00
Specialty Technician $203.00 $253.00 $252.00
3.2. Definitions:
3.2.1. Straight time shall be eight (8) hours per day, Monday through Friday except on federal holidays.
3.2.2. Hours in excess of eight (8) hours Monday through Friday and all hours on Saturday shall be billed at Overtime rates.
3.2.3. Hours on Sundays and Federal holidays shall be billed at double time rates. Holidays are defined as: New Year's Day, Martin Luther King Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
3.3. Minimum billable hours are eight (8) hours per day except holidays
3.4. Standby Time: If Contractor staff is required to be available for call-in on weekends or holidays, Contractor may invoice at straight time.
3.5. Travel
3.5.1. Contractor may quote and invoice Per Diem as further defined in Section 5 of this Exhibit B for non-local resources every day that a contractor employee is assigned to the City, including travel until individual is released from the job site (demobilized).
Amendment No. 1 to Agreement/*insert Contractor's name
Rev. 10/25/2019
Page4
3.5.2. Contractor may invoice travel time based on straight time for all nonlocal resources when services are provided at SVP's location.
4. EQUIPMENT:
4.1. Equipment shall be quoted and invoiced based on the below table:
EQUIPMENT DAILY CONSUMABLES FREIGHT
Major Set (Steam/Gas) HGP $1,500 $250/day
Tool Set $1,000 $200/day
Cl Tool Set/Minor Generator $ 750 $150/day Cost
Tool Set $1,000 $250/day +15%
Company Truck $ 250 Fuel cost + 15%
4.2. Tool rental charges start when the tools are off loaded at site and apply until tools are shipped from site.
5. REIMBURSABLE EXPENSES
5.1. If included in a quote, Contractor may submit invoices for reimbursement of expenses set forth below, subject to the following conditions.
5.2. Expenses shall be reimbursable only to the extent that the Contractor submits sufficient documentation to the City that the expenses were directly incurred in providing the required services and are not included in a fixed cost for such services.
5.3. The following expenses shall be reimbursable by the City.
5.3.1. Travel-related expenses (mileage, lodging, meals, etc.);
5.3.2. Unless approved in writing (e-mail acceptable) in advance, meals, lodging, and related Per Diem shall not exceed the rates outlined by United States General Services
Administration (GSA).
https://www.gsa.gov/travel-resources
5.3.3. The City shall not reimburse local travel (within Santa Clara County).
5.3.4. The rental of any specialized equipment to the extent the City has preapproved, in writing, the cost of such rental.
5.3.5. The cost of mailing, shipping and/or delivery of any documents or materials on behalf of the City.
5.3.6. Any other expenses expressly identified as being reimbursable.
Amendment No. 1 to AgreemenU*insert Contractor's name
Rev. 10/25/2019
5.3.7. Contractor shall quote and invoice mileage based on the current IRS rate.
5.4. Except as specified above, the City will reimburse these expenses at actual cost plus 15%.
6. INVOICING
6.1. Contractor shall submit an invoice to the City monthly, in arrears, for payment for services performed the previous month, pursuant to this Agreement.
6.2. City shall pay Contractor for Additional Services in accordance with approved quotes and the rates listed in this Exhibit B-1.
6.3. Each invoice shall include the task costs for the previous month.
6.4. The City shall review the invoice submitted by Contractor and shall notify Contractor of any discrepancies or deficiencies in said invoice.
6.5. If the City disputes an expense in an invoice, the City may deduct the disputed expense from the payment of that invoice, provided that the City submits to the Contractor a written explanation of why the expense is being disputed.
6.6. If there are no discrepancies or deficiencies in the submitted invoice and Contractor has submitted all required Certified Payroll using LCP Tracker or such other system as defined by City, City shall process the invoice for payment.
Amendment No. 1 to AgreemenU*insert Contractor's name
Rev. 10/25/2019
Ebix Insurance No. S200004650
AMENDMENT NO. 2
TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
ALLIED POWER GROUP
PREAMBLE
This agreement ("Amendment No. 2") is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) Allied Power Group, LLC, a Delaware Limited Liability Corporation, (Contractor). City and Contractor may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled Agreement for Services Between the City of Santa Clara and Allied Power Group, dated June 25, 2021(Agreement); and
B. The Agreement was previously amended by Amendment No. 1, dated August 19, 2021. The Agreement and all previous amendments are collectively referred to herein as the "Agreement as Amended"; and
C. The Parties entered into the Agreement as Amended for the purpose of having Contractor provide emergency overhaul services at the Gianera Power Plant, and
D. Due to additional emergency repair needs, the Parties now wish to amend the Agreement as Amended to extend the term.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Agreement as Amended, entitled "TERM OF AGREEMENT" is amended to read as follows:
Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on June 1, 2021 and terminate on December 31, 2022.
Amendment No. 2 to Agreement/Allied Power Group
Rev. 10/25/19
2. Except as set forth herein, all other terms and conditions of the Agreement as Amended shall remain in full force and effect. In case of a conflict in the terms of the Agreement as Amended and this Amendment No. 2, the provisions of this Amendment No. 2 shall control.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 2 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form:
Digitally signed by Caio Arellano
Date: 2021.12.20 10:56:42
-08'00'
Office of the City Attorney
City of Santa Clara
"CITY"
Ci y Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
ALLIED POWER GROUP
A DELEWARE LIMITED LIABILITY CORPORATION
Dated: December 12, 2021
By (Signature)
Name.
J2;----;
James Masso
~
Title: President - Allied Power Group
Principal Place of
Business Address: (to be filled in by City staff)
Email Address: [email protected]
Telephone: .( ) +1-904-553-8820
Fax: .( ) 281-444-3535
"CONTRACTOR"
S:\Attorney\AGREEMENTS\Amendments\Amendment No. 2 - Form.doc Amendment No. 2 to Agreement/Allied Power Group
Rev. 10/25/2019
Page2
EBIX Insurance No. *S200004650
AMENDMENT NO. 3 TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
ALLIED POWER GROUP
PREAMBLE
This agreement ("Amendment No. 3") is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) Allied Power Group, LLC, a Delaware Limited Liability Corporation, (Contractor). City and Contractor may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled Agreement for Services Between the City of Santa Clara and Allied Power Group, dated June 25, 2021 (Agreement); and
B. The Agreement was previously amended by Amendment No. 1, dated August 19, 2021 and by Amendment No. 2 dated December 21, 2021. The Agreement and all previous amendments are collectively referred to herein as the "Agreement as Amended"; and
C. The Parties entered into the Agreement as Amended for the purpose of having Contractor provide emergency overhaul services at the Gianera Power Plant, and D. Except for parts at the depot awaiting overhaul, work performed under the Agreement and Amendment No. 1 have been completed and due to additional emergency repair needs on Gianera Unit 2, the Parties now wish to amend the Agreement as Amended to add additional scope including the purchase of a spare rotor.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 6 of the Agreement, entitled "COMPENSATION AND PAYMENT" is amended to read as follows:
In consideration for Contractor's complete performance of Services, City shall pay Contractor for all materials provided and Services rendered by Contractor in accordance with Exhibit B, entitled "FEE SCHEDULE AND PAYMENT PROVISIONS." The maximum compensation of this Agreement is nine million dollars ($9,000,000), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services including sales tax and any other payments required to Contractor. All work performed or materials provided in Amendment No. 3 to Agreement/' Allied Power Group
Rev. 10/25/19
excess of the maximum compensation shall be at Contractor's expense.
Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.
2. Exhibit A-2 which was referenced in the Agreement and not attached is hereby attached and incorporated by reference.
3. Exhibit A-3 Additional Scope of Services Effective January 12, 2022 is hereby attached and incorporated by reference.
4. Exhibit B - Fee Schedule and Payment Provisions shall be deleted and replaced with the attached Exhibit B - Fee Schedule and Payment Provisions - Amended January 12, 2022.
5. Except as set forth herein, all other terms and conditions of the Agreement as Amended shall remain in full force and effect. In case of a conflict in the terms of the Agreement as Amended and this Amendment No. 3, the provisions of this Amendment No. 3 shall control.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 3 as evidenced by the following signatures of their duly authorized representatives .
CITY OF SANT A CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated: ~Bl;H).:;; L.-- • Digitally signed by Luis M. Haro ' LUIS M Haro Date:2022.02.0110:44:28 ' -08'00'
Office of the City Attorney
City of Santa Clara
"CITY"
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
ALLIED POWER GROUP, LLC
A Delaware Corporation
Dated: ~25,~22
By (Signature):
Name: ~AfJfM
~
68Mi8- James Masso
Title: 81,~mift~ft'!l'Me-@ffieer President
Principal Place of 10131 Mills Road
Business Address: Houston, TX 77070
Email Address: 1'!~tel"tie@otftee!Ptreom jmasso@alliedpg .com Telephone: f~12, O?O ~ 904 553 8820
"CONTRACTOR"
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
AGREEMENT FOR SERVICES BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA AND ALLIED POWER GROUP
EXHIBIT A-3
ADDITIONAL SCOPE OF SERVICES EFFECTIVE JANUARY 12, 2022 Contractor will provide experienced labor, supervision, engineering, equipment, machinery, tools, and materials necessary to perform the services for Silicon Valley Power (SVP) as detailed below:
1. Scope of Work - Frame 5 Major Inspection
1.1. Disassembly
1.1.1. Pre-job safety training
1.1.2. Lockout/ Tagout (LOTO)
1.1.3. Check accessory alignment
1.1.3.1. 1.1.3.2.
1.1.3.3. Disassemble accessory coupling guard
Remove accessory coupling and install alignment
fixture
Check as-found accessory alignment
1.1.4. Check load package and generator alignment
1.1.4.1. 1.1.4.2.
1.1.4.3. 1.1.4.4.
Disassemble load coupling guard, bellows, and #2
bearing extension cover
Disassemble and remove load coupling
Install alignment fixture and check alignment
Check generator quill shaft alignment
1.1.5. Remove combustion components
1.1.5.1. 1.1.5.2.
1.1.5.3. 1.1.5.4.
1.1.5.5. Remove gas, atomizing air, fuel oil & water injection pigtails
Remove Fuel Nozzles (FN)
Remove combustion chamber covers
Remove retainers, cross fire tubes, and liners
Hot bolt manifolds and interference cooling air piping
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
1.1.5.6. 1.1.5.7.
1.1.5.8. Unbolt outer cross fire tubes and hot bolt combustion chambers
Remove manifolds and interference cooling air piping
Remove combustion chambers
1.1.6. Inlet and exhaust
1.1.6.1. 1.1.6.2.
1.1.6.3. 1.1.6.4.
1.1.6.5. 1.1.6.6.
1.1.6.7. 1.1.6.8.
1.1.6.9. Remove insulation packs from inlet elbow and prep elbow for removal
Prep exhaust stack for removal
Prep turbine roof and walls for removal
Rig and remove Inlet elbow
Record opening 6-point RO blade clearance checks
Rig and remove exhaust stack, turbine roof and walls
Remove aft flex seals
Remove Upper Half Forward (U/H FWD) flex seals
Unbolt exhaust diffuser and drift aft
1.1 . 7. Remove cases
1.1.7.1. 1.1.7.2.
1.1.7.3. 1.1.7.4.
1.1.7.5. 1.1.7.6.
1.1.7.7. 1.1.7.8.
1.1.7.9. 1.1.7.10.
Install casing jacks
Unbolt and remove turbine case
Unbolt and remove aft compressor case
Unbolt and remove Forward (FWD) compressor case
Perform Inlet Guide Vanes (IGV) checks
Remove inlet bell mouth
Remove Transition Pieces (TP)
Remove Compressor Discharge Case (CDC)
Remove inner barrel U/H
Remove exhaust hood frame
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10125119
1.1.7.11. 1.1.7.12.
1.1.7.13. 1.1.7.14.
1.1.7.15. Remove Upper Half (U/H) First Stage Nozzle (1SN) Remove U/H 1 SN Support Ring
Removed U/H Second Stage Nozzle (2SN) and
Diaphragm
Remove Lower Half (L/H) 1SN
Remove L/H 1 SN support ring
1. 1.8. Record opening clearances
1.1.8.1. 1.1.8.2.
1. 1.8.3.
1.1.8.4. 1. 1.8.5.
1.1.8.6. 1.1.8.7.
1.1.8.8. 1.1.8.9.
Remove #2 bearing housing U/H and check bearing
pinch
Remove #2 bearing oil seal U/H and record opening
clearances
Perform rotor thrust bump and leave against active
thrust
Record opening turbine clearances
Record opening compressor clearances
Remove #1 bearing housing U/H and check bearing
pinch
Record opening #1 bearing seal clearances and
disassemble oil slinger ring
Disassemble thrust bearing
Remove L/H of #1 and #2 bearing oil seals
1. 1.9. Rig and remove turbine rotor and place in stands
1.2. Clean and inspect
1.2.1. Bearings and seals: Fixed price scope includes removal, inspection, and replacement of existing bearings and seals.
Repairs, refurbishment, or replacement with new parts shall be quoted using the Time and Materials (T&M) rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A.
1.2.1.1. Remove and inspect Bearing # 1 and # 2 oil seals Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
1.2.1.2. 1.2.1.3.
If required, repairs will be performed on #1 and #2
bearing oil seals. Such additional services shall be
quoted using the T&M rates specified in Exhibit B and
the process outlined in Section 8 of this Exhibit A.
Visual inspection of active and inactive thrust bearing on-site.
If required, repairs will be performed on active and
inactive thrust bearing. Such additional services
shall be quoted using the T&M rates specified in
Exhibit B and the process outlined in Section 8 of this Exhibit A.
Remove and inspect #1 and #2 bearing on-site,
If required, #1 and #2 bearings will be replaced.
Such additional services shall be quoted using the
T&M rates specified in Exhibit B and the process
outlined in Section 8 of this Exhibit A.
If required, Send #1 and #2 bearings for
refurbishment . Such additional services shall be
quoted using the T&M rates specified in Exhibit B and
the process outlined in Section 8 of this Exhibit A
using T&M rates. (#2 bearing is new.)
1.2.2. Compressor stator vanes
1.2.2.1. 1.2.2.2.
1.2.2.3. 1.2.2.4.
Steam clean stator and rotor blades
Inspect compressor rotor and stator blades
Clean casings and inspect for damage
Blend and deburr any compressor blades that are
damaged
1.2.3. Hot Gas Path (HGP) & combustion components
1.2.3.1. 1.2.3.2.
1.2.3.3. Record serial numbers (FNs, Combustion Liners
[Cls], TPs, 1SN, 2SN)
Inspect cross fire tubes and retainers
Inspect stage 1 - 2 shrouds and replace if necessary
1.2.4. Bolting, piping and casings
Amendment No. 3 to Agreement/• Allied Power Group
Rev. 10/25/19
1.2.4.1. 1.2.4.2.
1.2.4.3. Clean, inspect and tap bolt holes; identify and repair any damaged threads
Clean & prep bolting for installation
Clean and blow out piping
1.2.5. Gear box: Fixed price scope includes inspection of existing gear box. Repairs, refurbishment, or replacement of new parts will be quoted using the T&M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A.
1.2.5.1. 1.2.5.2.
1.2.5.3. 1.2.5.4.
1.2.5.5. 1.2.5.6.
1.2.5.7. 1.2.5.8.
1.2.5.9. Remove accessory gear box inspection covers and perform visual inspection
Check accessory gear shaft lift and float checks
Remove gears and inspect bearings.
Inspect accessory gear box bearings.
If required, accessory gear box bearings will be
replaced using T&M. Removed bearings will be
shipped for refurbishment at T&M and returned to City
for inventory. These services shall be quoted using
the T&M rates specified in Exhibit Band the process
outlined in Section 8 of this Exhibit A.
Close out accessory gear box and reinstall covers
Remove load gear box inspection covers and perform
visual inspection
Check load gear back-lash and gear contact
Remove gears and inspect bearings
If required, load gear box bearings will be replaced
using T&M. Removed bearings will be shipped for
refurbishment at T&M and returned to City for
inventory. These services shall be quoted using the
T &M rates specified in Exhibit B and the process
outlined in Section 8 of this Exhibit A
Close out load gear box and reinstall covers
1.2.6. IGV Assembly
1.2.6.1. Record IGV opening clearance data
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10125119
1.2.6.2. 1.2.6.3.
Replace IGV bushing and thrust washers
Record closing IGV clearance data
1.2.7. Rotor Assembly
1.2.7.1. 1.2.7.2.
1.2.7.3. Remove and replace stage 1 and 2 buckets
Measure and record journal diameters
Remove and replace RO blades.
1.2.8. Pumps and Motors: Fixed price scope includes open, clean, close and align pumps and motors; remove and repair torque converter, remove and repair pumps (including shipping), remove and repair motors (including shipping).
1.2.9. Remove and inspect the following pumps and motors: AC Lube Oil (L/O) pump motor, AC (L/O) pump, DC L/O pump motor, DC L/O pump, diesel forward pump motor, diesel forward pump, hydraulic pump motor, hydraulic pump torque converter, hydraulic ratchet motor, hydraulic ratchet pump, starting motor.
1.2.10. Install and align all pumps and motors after repair.
1.2.11. Reassembly
1.2.11.1. Uncover L/H and blow out cases
1.2.11.2. Install L/H 2SN
1.2.11.3. Install L/H turbine bearings
1.2.11.4. Install L/H 1 SN
1.2.11.5. Install turbine rotor
1.2.11.6. Check #1 and #2 bearing twist & tilt and install U/H bearing
1.2.11.7. Install thrust bearing
1.2.11.8. Install #1 bearing cover dry, check rotor position & thrust and removed cover.
1.2.11.9. Grid thrust shims (as needed)
1.2.11.10. With rotor set against active thrust, chart compressor and turbine clearances
Amendment No. 3 to Agreement/'Allied Power Group
Rev. 10/25119
1.2.11.11. Install and set #2 bearing oil seals and record final clearances
1.2.11.12. Install and set #1 bearing oil seals and record final clearances
1.2.11.13. Check #2 bearing cover pinch, correct as needed and final install cover.
1.2.11.14. Install exhaust frame hood and air baffle
1.2.11.15. Install exhaust diffuser
1.2.11.16. Install aft flex seals
1.2.11.17. Install FWD flex seals
1.2.11.18. Install exhaust plenum roof
1.2.11.19. Install U/H 1 SN support ring & 1 SN
1.2.11.20. Install U/H inner barrel
1.2.11.21. Install CDC
1.2.11.22. Install U/H aft compressor Case
1.2.11.23. Install TPs with lnconel rope seal
1.2.11.24. Install combustion chambers and outer cross fire tubes
1.2.11.25. Install combustion liners, inner cross fire tubes and retainers
1.2.11.26. Install end covers and FN
1.2.11.27. Install U/H 2SN segments
1.2.11.28. Install turbine shell
1.2.11.29. Install cooling and sealing air piping
1.2.11.30. Install manifolds, pigtail piping, and tubing
1.2.11.31. Install U/H FWD compressor case
1.2.11.32. Final install #1 bearing cover
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
1.2.11.33. Install inlet bell mouth
1.2.11.34. Remove casing jacks
1.2.11.35. Reinstall turbine compartment
1.2.11.36. Record closing RO compressor blade 6-point checks
1.2.11.37. Install inlet plenum FWD wall
1.2.11.38. Install inlet plenum wall and roof
1.2.11.39. Install turbine compartment roof
1.2.11 .40. Install turbine compartment doors
1.2.11 .41. Reinstall exhaust stack
1.2.11.42. Reinstall inlet elbow and insulation panels
1.2.11.43. Install new expansion joints
1.2.11.44. Check load package alignment
1.2.11.45. Check accessory alignment
1.2.12. Alignment, commissioning & start-up support
1.2.12.1. Correct Accessory Alignment, if needed (up to two shifts). Additional shifts, if needed, shall be quoted
using the T&M rates specified in Exhibit B and the
process outlined in Section 8 of this Exhibit A.
1.2.12.2. 1.2.12.3,
1.2.12.4. 1.2.12.5.
1.2.12.6. 1.2.12.7.
1.2.12.8. Install accessory coupling and guard
Correct load package alignment, if needed (up to two
shifts). Additional shifts, if needed, shall be quoted
using the T&M rates specified in Exhibit B and the
process outlined in Section 8 of this Exhibit A.
Install load coupling
Install load coupling guard
Reinstall rat guards and close hatches
Clean up site and inventory tooling
Support unit start-up
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
2. Division of Responsibility for on-site work
Description Contractor
Labor:
Review the scope of work,
scheduling, and planning with
SVP's representative
Provide field engineers as
required by the scope of work
Provide project manager as
required by the scope of work
Provide supervision as
required by the scope of work
Provide qualified labor and
perform the scope of work
Final field report
Bucket Tech
Tooling
Provide tool set for the
workforce including
transportation
Cable slings, lifting devices
and associated special tooling
supplied with the original
equipment order
Rotor Stands
Consumables:
Normal Consumables
Oxv!'.len, acetylene and qas
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
X
X
X
X
X
X
X
X
X
X
X
X
SVP Notes
Contractor may use
SVP's existing
X alignment fixture for
accessory to turbine
and turbine to load
qear
Rags, Cleaners, etc.
Description Contractor
Trash Containers and
disposal service
Pallets and wood for crating &
shipping items off site
Potable water
Fire protection equipment/
first aid facilities
Sub Contract Services:
Crane & Operator
Scaffolding
Cribbing
Insulation Removal and
replacement
Machine shop services
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
X
X
X
X
X
X
X
X
SVP Notes
X
SVP will provide
X crates when
available.
T&M, if required
(Additional services
shall be quoted using
the T&M rates
specified in Exhibit B
and the process
outlined in Section 8
of this Exhibit A)
T&M, if required
(Additional services
shall be quoted using
the T &M rates
specified in Exhibit B
and the process
outlined in Section 8
of this Exhibit A)
Description Contractor
On-site machining
Disposal of hazardous waste
All asbestos removal and
disposal (Services shall be
quoted using the T&M rates
specified in Exhibit B and the
process outlined in Section 8
of this Exhibit A)
New Parts and consumables
Freight
Rentals:
Office trailer, change trailer
Chemical toilets
Compressed air
Forklifts
WeldinQ Machine
Man lift
Borescope
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
X
X
X
X
X
X
X
X
X
X
X
SVP Notes
T&M, if required
(Additional services
shall be quoted using
the T &M rates
specified in Exhibit B
and the process
outlined in Section 8
of this Exhibit A)
X
X
Contractor shall
prepare items for
freight. Where freight
costs are not included
X in fixed scope freight
costs shall be
reimbursed subject to
provisions of Exhibit
B
Description Contractor SVP Notes
Generator X
Hand washing station X
Special Tooling:
Confined Space Monitor X
Tensioning and hydraulic X wrenches
Boxes for HGP components X
Special Tooling:
Confined Space Monitor X
Tensioning and hydraulic X wrenches
Boxes for HGP components X
On-Site Services:
Electrician/Instrumentation for X disconnects and connections Electrical power including:
(120/480 VAC single phase X and 480 VAC three phase up
to 100 amps), service water
Non-Destructive Testing X
(NOT) material and services
Critical Path Method (CPM) X schedule
3. Parts Supply: Contractor shall supply rotor with operating data as depicted in Exhibit A-4 Operating Data for Replacement Rotor
4. Parts Refurbishment/ Repair following overhaul.
Contractor shall perform the following services to repair parts after overhaul. Parts shall be returned in condition available for use as spare parts:
Amendment No. 3 to AgreemenU* Allied Power Group
Rev. 10/25/19
4.1. Unit 2 Rotor Repair Depot Service:
4.1.1. 4.1.2.
Inspection and Field Operations:
4.1.1.1. 4.1.1.2.
4.1.1.3. OPTIONS:
Anti-Rock coating Stage 1 & 2 (stacked)
Compressor coating (stacked)
Anti-corrosion coating (stacked)
If required the contractor shall perform the following optional services. Such additional services shall be quoted using the Time and Materials [T&M] rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A).
4.1.2.1. Break marriage coupling & remarry
4.1.2.2. 4.1.2.3.
4.1.2.4. 4.1.2.5.
4.1.2.6. Unstack/Restack compressor section
Unstack/Restack turbine section
New Marriage bolt kit
New Compressor through bolt kit
New Turbine through bolt kit
4.2. 1st Stage Nozzle Inspection/Repairs
4.2.1. Inspection
4.2.1.1. 4.2.1.2.
4.2.1.3. 4.2.1.4.
4.2.1.5. 4.2.1.6.
4.2.1.7. 4.2.1.8.
4.2.1.9. 4.2.2. Repairs
4.2.2.1. 4.2.2.2.
4.2.2.3. Receive and identify
Incoming visual inspection and document condition
Dimensional inspection including but not limited to:
harmonics, throat opening, gas path diameter
Disassemble nozzle
Remove core plugs
Clean by grit blasting
Visual penetrant inspection
Defect map
Rout out damage and cracks
Solution heat treat
Weld repair in restraining fixture (install trailing edge inserts as necessary)
Blend to original contour
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
4.2.3. 4.2.4.
4.2.2.4. 4.2.2.5.
4.2.2.6. 4.2.2.7.
4.2.2.8. 4.2.2.9.
4.2.2.10. 4.2.2.11.
Adjust exit area
Visual penetrant inspection
Solution heat treat
Install core plugs
Replace all hardware.
Assemble nozzle and correct support ring fit as
necessary
Weld nozzle segment side seals in place, as required.
Visual and dimensional inspection including, but not
limited to harmonics, throat opening, gas path
diameter
Supply repair report including pictures, furnace charts, inspection forms
Crate and ship
4.3. 2nd Stage Nozzle & Diaphragm Inspection/Repairs:
4.3.1. 4.3.2.
Inspection
4.3.1.1. 4.3.1.2.
4.3.1.3. 4.3.1.4.
4.3.1.5. Repairs
4.3.2.1. 4.3.2.2.
4.3.2.3. 4.3.2.4.
4.3.2.5. 4.3.2.6.
4.3.2.7. 4.3.2.8.
Receiving inspection and customer identification
Take incoming dimensions on the nozzle and
diaphragm and record including, but not limited to,
harmonics, throat opening, gas path diameter, etc.
Disassemble nozzle and diaphragms
Aluminum oxide blast clean
Visual penetrant inspection
Grind out and rout all defects
Solution heat treat
Weld repair all defects using Tungsten Inert Gas
(T.I.G.) process and N155 nozzle filler material
Blend all repaired areas as necessary to obtain a
smooth gas path (Ra 80u-in or better)
Restore all parts to proper dimension
Visual penetrant inspection
Measure and calculate and adjust flow area as
required; provide final area check dimension
Replace all hardware
Amendment No. 3 to Agreemenl/'Allied Power Group
Rev. 10/25/19
4.3.3. 4.3.4.
4.3.2.9. 4.3.2.10.
4.3.2.11. 4.3.2.12.
4.3.2.13. 4.3.2.14.
4.3.2.15. 4.3.2.16.
4.3.2.17. Reassemble nozzle and diaphragm; replace dowels and blocks as required and re-dowel nozzle to
diaphragm (verify 2N2 dimension)
Repair/replace discourager forward and aft seals as
required
Replace interstage packing and replace and/or
machine packing shims as required
Install insulation for Heat Pack Mod per GE Technical
Information Letter (TIL) #263-3
Replace or modify "J" seal to "U" style seal
Install new replacement thermocouples supplied by
contractor
Stake all hardware in place
Round Nozzle; re-machining of inner hook-fits to
datum
Insure 100% contact at horizontal joints
Supply repair report including pictures, furnace charts, inspection forms
Crate and ship
4.4. 1st and 2nd Stage Shroud Inspection/Repairs:
4.4.1. Inspection
4.4.1.1. 4.4.1.2.
4.4.1.3. 4.4.1.4.
4.4.1.5. 4.4.2. Repairs
4.4.2.1. 4.4.2.2.
4.4.2.3. 4.4.2.4.
4.4.2.5. 4.4.2.6.
4.4.2.7. Receive and identify
Visual/ dimensional inspection
Clean by grit blasting, strip coating as required
Visual penetrant inspection
Defect map
Grind to remove damage and cracks
Stress relief heat treat
Weld repair in restraining fixture
Weld shut locating holes, as requested by City
Machine or blend welds to original contour
Visual penetrant inspection
Final visual and dimensional inspection
Amendment No. 3 to Agreement/" Allied Power Group
Rev. 10/25/19
4.5. 4.6.
4.4.3. 4.4.4.
4.4.2.8. Replacement hardware is not included in pricing.
Contractor shall provide quotes for replacement
hardware. (Additional services shall be quoted using
the T&M rates specified in Exhibit Band the process
outlined in Section 8 of this Exhibit A)
Supply repair report including pictures, furnace charts, inspection forms, moment chart
Pack and ship
1st Stage Bucket Inspection/Repairs:
4.5.1. Inspection
4.5.1.1. Receive and identify
4.5.1.2. Incoming visual inspection and document condition
4.5.1.3. Aluminum oxide blast clean
4.5.1.4. Visual/ dimensional inspection
4.5.1.5. Fluorescent penetrant inspection
4.5.1.6. Metallurgical sample
4.5.2. Repairs
4.5.2.1. Rout all cracks for weld preparation
4.5.2.2. Pre-weld heat treat
4.5.2.3. Weld repair damaged areas and blade tip
4.5.2.4. Blend welded areas
4.5.2.5. Bucket tip/angel wing seal repair and machining
4.5.2.6. Post-weld heat treat and shot peen
4.5.2.7. Fluorescent penetrant inspection
4.5.2.8. Visual/ dimensional inspection
4.5.2.9. Moment weigh and balance
4.5.3. Supply repair report including pictures, furnace charts, inspection forms, moment chart
4.5.4. Crate and ship
2nd Stage Bucket Inspection/Repair:
4.6.1. Inspection
4.6.1.1. 4.6.1.2.
Receive and identify
Incoming visual inspection and document condition
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
4.6.2. 4.6.3.
4.6.4. 4.6.1.3.
4.6.1.4. 4.6.1.5.
4.6.1.6. Repairs
4.6.2.1. 4.6.2.2.
4.6.2.3. 4.6.2.4.
4.6.2.5. 4.6.2.6.
4.6.2.7. 4.6.2.8.
4.6.2.9. Aluminum oxide blast clean
Visual/ dimensional inspection
Fluorescent penetrant inspection
Metallurgical evaluation (Non-Destructive
Examination [NOE])
Rout all cracks for weld preparation
Pre-weld heat treat
Weld repair damaged areas, "z" notch and seals
Blend welded areas
Restore "z" notch and seals
Post weld heat treat
Fluorescent penetrant inspection
Visual / dimensional inspection
Moment weigh and balance
Supply repair report including pictures, furnace charts, inspection forms, moment chart, etc.
Crate and ship
4.7. Transition Pieces Inspection/Repair:
4.7.1. Inspection
4.7.1.1. 4.7.1.2.
4.7.1.3. 4.7.1.4.
4.7.1.5. 4.7.2. Repairs
4.7.2.1. 4.7.2.2.
4.7.2.3. 4.7.2.4.
4.7.2.5. 4.7.2.6.
4.7.2.7. Receive and identify
Incoming visual inspection and document condition
Clean by grit blasting
Visual penetrant inspection
Remove seals
Rout cracks
Solution heat treat
Weld repair
Blend to original contour
Repair forward opening
Visual penetrant inspection
Solution heat treat
Amendment No. 3 to Agreement/' Allied Power Group Page 19 of 47 Rev. 10/25/19
4.7.3. 4.7.4.
4.7.5. 4.7.2.8.
4.7.2.9. Visual/ dimensional inspection
Fit to first stage nozzle
Additional items not included in the based Inspection and Repair. If required, (Additional services shall be quoted using the Time and Materials [T&M] rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A):
4.7.3.1. 4.7.3.2.
4.7.3.3. 4.7.3.4.
Replace Inner Floating Seal
Replace Inner Flexed Seal
Replace Outer Fixed Seal
Apply TBC (Full ID)
Supply repair report including pictures, furnace charts, inspection forms
Crate and ship
4.8. Fr5 Combustion Liner Inspection/Repair
4.8.1. Inspection
4.8.1.1. 4.8.1.2.
4.8.1.3. 4.8.1.4.
4.8.1.5. 4.8.2. Repairs
4.8.2.1. 4.8.2.2.
4.8.2.3. 4.8.2.4.
4.8.2.5. 4.8.2.6.
4.8.2.7. 4.8.2.8.
4.8.2.9. 4.8.2.10.
4.8.2.11. Receive and identify
Match mark and remove cowl caps
Clean by grit blasting
Visual/ dimensional inspection
Issue report
Remove crossfire arms and spring seals, as required
Rout cracks and weld prep
Weld repair
Blend to original contour.
Machine fuel nozzle collars
Repair exit openings
Solution heat treat
Visual inspection
Install spring seals, as required
Install cowl caps
Visual/ dimensional inspection
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
4.8.3. Additional items not included in the base inspection and repair as outlined in this Section. If required, additional services shall be quoted using the T&M rates specified in Exhibit Band the process outlined in Section 8 of this Exhibit A and may include, but are not limited to:
4.8.3.1. 4.8.3.2.
4.8.3.3. Replacement Spring Seals
Replacement Cowl Caps
ApplyTBC
4.8.4. Provide Final Report
4.8.5. Pack and prepare for shipment
4.9. Fr5 Fuel Nozzles - Standard Dual Fuel (DF) Inspection/Repair
4.9.1. Inspection
4.9.1.1. Receive into Service Center
4.9.1.2. Visually inspect and identify
4.9.1.3. Record serial numbers
4.9.1.4. Incoming flow test
4.9.1.4.1. Gas
4.9.1.4.2. Atomizing air
4.9.1.4.3. Liquid
4.9.1.5. Incoming borescope, as required
4.9.1.6. Disassemble;
4.9.1.7. 4.9.1.6.1. Match mark gas tip to body
4.9.1.6.2. Disassemble gas tips from body
4.9.1.6.3. Remove locking rings
4.9.1.6.4. Remove seals from gas tip flange
4.9.1.6.5. Atomizing air
4.9.1.6.6. Liquid
Glass Beads
4.9.1.7.1. Body
4.9.1.7.2. Gas Tips
4.9.1.8. Dimensional Inspection
4.9.1.8.1. Dimensionally inspect gas tip diameters
4.9.1.8.2. Pin check gas holes
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
4.9.2. 4.9.3.
4.9.4. 4.9.5.
4.9.1.9. 4.9.1.10.
4.9.1.11. 4.9.1.12.
4.9.1.13. 4.9.1.14.
Repairs
4.9.2.1. 4.9.2.2.
4.9.2.3. Visually inspect gas lips and document condition Reassemble check valves
Ultrasonic clean end covers
Photograph various steps in the process
Engineering review
Issue report with recommendations
Chemically clean body internals, power flush, and air
dry.
Weld repair/ blend/ NOE, as required
Liquid cartridge
4.9.2.3.1. Flow corrections to atomizing air
4.9.2.3.2. Flow corrections to liquid fuel.
4.9.2.4. Assemble
4.9.2.5. 4.9.2.6.
4.9.2.7. 4.9.2.8.
4.9.2.4.1. Liquid cartridge with gas lips to bodies
4.9.2.4.2. Fuel tips to body
4.9.2.4.3. Gas tips to body
Torque tips per specification / tie wire and tack weld
gas lip
Final flow test
4.9.2.6.1. Atomizing air
4.9.2.6.2. Gas
4.9.2.6.3. Liquid fuel
Engineering review and release
Stake and tack weld lock tabs
Additional items not included in the base inspection and repair as outlined in this Section. If required, additional services shall be quoted using the T&M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A and may include, but are not limited to:
4.9.3.1. 4.9.3.2.
Tip OD restoration
Liquid Cartridge
Prep for shipment per SVP instructions
Provide Final Report
Amendment No. 3 to Agreement/'Allied Power Group
Rev. 10/25/19
5. Project Management and other services: Contractor will provide overall Project Management of all phases of this scope of services, provide component repair at Contractor's Houston repair center as well as provision of new and/or refurbished components as required
6. Schedule of Work
6.1. Within five (5) days of the effective date of this agreement, Contractor shall provide a project schedule in similar format to the schedule attached to the Agreement as Exhibit A-1 - SAMPLE PROJECT SCHEDULE.
6.1.1. 6.1.2.
Contractor and City will review and make changes as needed.
Contractor and City will agree upon a final schedule in writing (email acceptable) in advance of starting work.
6.2. Crew schedule will be seven (7) days per week and twelve (12) hours per day in one shift. In the event that schedule adjustments result in additional costs, additional services shall be quoted using the T&M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A.
6.3. Depot Parts Repair Schedule:
6.3.1. 6.3.2.
Unit 2 Rotor Repair outlined in Section 4 of this Exhibit A is estimated to require between five and six weeks at Contractor depot.
Remaining depot parts repairs outlined in Section 4 of this Exhibit A are estimated to require between eight and ten weeks at Contractor depot.
6.4. Based on scope increases, discoveries and changes that arise outside of the scope described herein, the outage duration will be adjusted and, upon approval of additional work the project schedule will be adjusted and resubmitted and shall be submitted for approval by SVP. If required, additional services or changes requiring additional costs shall be quoted using the T&M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A.
7. Assumptions:
7.1. Outage duration will be adjusted depending on scope increases, discoveries and changes that arise outside of the scope described herein. If required, additional services, outage extensions, extra work or changes requiring additional costs shall be quoted using the T &M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A.
Amendment No. 3 to Agreement/'Allied Power Group
Rev. 10/25/19
7.2. It is assumed that no hazardous material will be encountered in performing the work-scope. Testing for, abatement, and disposal of any hazardous or regulated material will be the responsibility of SVP.
7.3. SVP is responsible for disposal of all leftover/used material and liquids from all operations performed by Contractor and subcontractors. Contractor will provide a detailed list of items (if applicable).
7.4. SVP will be responsible for isolating all work areas from hazard (i.e., steam, electrical, and chemical) for the scope of Contractor's work. SVP will perform LOTO on all systems associated with this Scope of Services. LOTO shall adequately isolate the equipment being worked on to the satisfaction of the supervision and craft performing the work.
7.5. Disassembly and reassembly of components will be performed utilizing standard industry practices unless otherwise specified. In the event that disassembly or reassembly activities require effort above and beyond standard industry practice such as: 1. Destructive means, 2. Transfer to offsite repair facility, 3. Mobilization of on-site machinists/specialist, 4.
Modification of form/fit/function or 5. Other significant effort not specified in advance, (if such effort results in additional costs, those services shall be quoted using the T&M rates specified in Exhibit B and the process outlined in Section 8 of this Exhibit A). In the event that critical path activities are unable to be performed due to the lack of an approved Work Authorization and the provisions of Section 8.6 do not apply, then Contractor may demobilize until approval is obtained. Demobilization and remobilization costs shall be included in the quote on a T&M basis.
7.6. Start-up is assumed to be immediate upon mechanical completion. Additional mobilization charges will apply to delayed start up. If additional mobilization charges are required, such services shall be quoted using the T&M rates specified in Exhibit Band the process outlined in Section 8 of this Exhibit A One (1) day has been allowed for this outage.
8. Additional Services [ Work Authorization:
8.1. All work not covered by the fixed or base work scope will be quoted using Contractor's time and material rates as specified in Exhibit B of this Agreement. For those items listed in Exhibit B-1, total costs for that task shall not exceed the amount in Exhibit B-1 unless justification is provided by Contractor and accepted by City. Such work and any associated costs shall be authorized using the process outlined in this Section 8 of Exhibit A and may include, but are not limited to:
8.1.1. Consumables, materials or equipment
8.1.2. Remove and replace RO blades either on site or transport to Contractor depot
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
8.1.3. Refurbish bearings
8.1.4. On site drilling of the stage 1 and 2 shroud blocks to install locator pins (if required)
8.1.5. Exhaust skin and insulation
8.1.6. Expansion joints and weather stripping
8.1.7. Vibration analysis at start up
8.1.8. Generator and cribbing
8.1.9. Unplanned demobilization and remobilization due to the request of SVP or due to the work being inaccessible
8.1.10. Technical Information Letter (TIL) Work
8.1.11. Asbestos: If upon evaluation, asbestos is determined to be present, Contractor shall provide a quote to abate such material.
Such quote will be based upon location and quantity and work will be performed in compliance with State and Federal Government regulations and will be presented in conformance with this Section.
Traceability and ownership of the material will remain with SVP after disposal.
8.2. Contractor is responsible for notifying SVP in a timely manner when the quoted cost may change. Contractor shall provide reason for the change specific to each additional work activity.
8.3. Any work and/or materials requested by the City that exceeds the maximum compensation stated in this Agreement shall require the execution of an amendment prior to the commencement of work, and written authorization subject to the provisions of this Section. Contractor shall not be entitled to any payment above the maximum compensation unless an amendment to this Agreement is executed by both Parties.
8.4. In the event that Contractor identifies additional services are required that are not in the fixed work scope of this Exhibit A, Contractor provide SVP with a quote for such services. Each quote shall include the following information listed separately:
8.4.1. 8.4.2.
Any findings leading to recommendation for additional work Specific project requirements for that quote including, where applicable, the specific issue to be remedied and services to be performed.
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
8.4.3. 8.4.4.
8.4.5. 8.4.6.
8.4.7. Project plan and schedule;
Pricing for any material, equipment permits or other costs to be incurred on behalf of the City for the project including any taxes, shipping, and other incidental costs;
Hourly rates for all labor to be used during the project including identification of any labor subject to prevailing wage requirements.
DIR number for any subcontractors; and
Total not-to-exceed price.
8.5. Each quote shall be approved, in writing (e-mail acceptable) in advance of starting work except as outlined in Section 8.6 of this Exhibit A.
8.6. In the following cases, contractor may initiate (or continue work exceeding a currently authorized quote) upon approval by e-mail of one of the following authorized individuals: Assistant Director, Chief Electric Utility Operating Officer, and Chief Electric Utility Officer. In the event that work is authorized without a quote under this section, Contractor shall provide a quote within two (2) business days that includes work activity that has already taken place as well as any additional activity required to complete the action requiring such work so that such changes can be documented in approved Work Authorization or Purchase Order within four (4) business days.
8.6.1. 8.6.2.
8.6.3. Emergency work: An emergency service shall be defined as an unforeseen event, circumstance, or combination thereof that the SVP reasonably determines to require immediate action, presents an immediate danger to public health and safety, and/or imperils SVP equipment.
In the event that issues are identified that can be most efficiently and economically resolved while on-site or, for services at Depot, by working continuously
Mobilization costs: Start-up is assumed to be immediate upon mechanical completion. Additional mobilization charges will apply to delayed start up. One day has been allowed for this outage.
8.7. City shall not be required to pay a deposit or any other form of pre-payment prior to the Contractor beginning work.
9. Contractor shall comply with Foreign Materials Exclusion (FME) Instruction 35 attached as Exhibit A-2 and incorporated by reference.
10. Reporting and Documentation
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
10.1. Contractor shall provide regular status updates on services performed during the term of the Agreement. Depending on work activity, status updates may be required daily, weekly, or monthly at the direction of the City.
10.2. At the end of each project, Contractor shall provide a complete report with any redlines to SVP's drawings, photo evidence, modifications, recommendations and a narrative of the work completed.
10.3. At the end of each project, Contractor shall also provide as-built drawings identifying any changes including source of authorization for change.
11. Staffing Requirements
11.1. Contractor' personnel have thorough knowledge and experience in the maintenance, inspection, repair and adjustment of heavy industrial gas turbines and their auxiliary systems.
11.2. Contractor shall be solely responsible for selecting, hiring, employing, paying, supervising, training and discharging all personnel necessary for the services in this Exhibit A.
11.3. Contractor shall ensure the following employment standards for all employees (including subcontractors) are complied with and enforced throughout the term of the contract.
11.3.1. United States of America citizenship or verified legal alien status.
11.3.2. At least eighteen (18) years of age.
11.3.3. Sufficiently fluent in English to: (a) comprehend the instructions of Contractor personnel; (b) offer the level of customer service established by the manager; (c) understand the safety and operating instructions on any equipment used; and (d)
communicate with emergency personnel during emergencies;
11.3.4. No known criminal background or record of conviction for other than minor vehicle code/traffic violations.
11.3.5. Possession of a current, valid U.S. driver's license permitting operation of a two-axle vehicle.
11.3.6. Ability to perform normal or emergency duties requiring moderate to arduous physical exertion.
11.4. Contractor shall employ only competent craftsmen/skilled workers who are appropriately trained and licensed to perform the required services.
Amendment No. 3 to Agreement/" Allied Power Group
Rev. 10/25/19
11.5. Contractor shall be responsible for understanding and complying with any training and licensing required for the performance of the services described in this Exhibit A, including but not limited to, DOT requirements for commercial driver's license and required drug testing if applicable.
11.6. The City may request verification of the assigned employees' qualifications at any time. Contractor shall promptly provide such verification upon request by the City.
11.7. Contractor shall ensure that all its employees and agents abide by established local, state and federal safety rules and regulations.
11.8. Contractor's employees and any subcontractors shall supply proper identification when requested by the City.
11.9. Contractor shall select and hire only persons who are well-qualified to perform the job duties for which they are being hired, who are neat, well-groomed, and courteous, and who can act in the utmost professional manner when interacting with City staff and the general public.
11.10. Classification and Duties of Employees
11.10.1. The Contractor shall include the classifications of employee positions and the duties of each position in each project schedule.
Classifications may include, but are not limited to:
11.10.1.1. Technical Advisor/Project Manager/General Manager:
Responsible for the day-to-day management and
supervision of the required services. On-site
responsibilities shall also include, but not be limited to, correcting problems, managing conflicts and
complaints, and overseeing work schedules,
personnel, and equipment requirements.
11.10.1.2. Supervisor/Foreman: Oversees field activities and repairs.
11.10.1.3. Technical/Field Personnel: Performs the required services included in this Exhibit A.
11.10.1 .4. Administrative Personnel: Assists in the
administration and reporting of the required services.
11.10.2. City has accepted the assignment of key personnel in Contractor's quote for Frame 5 Major Proposal# APG 21-5616 Inspection dated November 17, 2021. Contractor shall inform the City immediately of any change in key personnel assigned to this project.
Amendment No. 3 to Agreement/* Allied Power Group
Rev. 10/25/19
11.10.2.1. Contractor shall submit the resumes and other qualifications of the proposed replacement
employee(s) to the City for review and approval.
11.10.2.2. The City shall not unreasonably withhold approval.
11.10.3. The City reserves the right to request the removal of any Contractor employee(s) who does not conduct themselves in a courteous, professional manner, or whose actions endanger the safety of people or property. The Contractor shall promptly respond to requests for replacement personnel.
12. Subcontractors
12.1. The City has authorized Contractor to subcontract with the following:
12.1.1. Veracity- NOE Services
12.1.2. Summit- Crane Services
12.1.3. United Rentals
12.1.4. Mobile Mini- Office and bathrooms
12.2. Additional subcontractors may be authorized through the work authorization process outlined in this Exhibit A.
13. Employee Training
13.1. Contractor shall train all employees (including subcontractors) assigned to perform the required services.
13.2. Contractor's employee training shall be at no cost to the City.
13.3. Contractor shall ensure that all employees (including subcontractors) who will be involved in the performance of services for the City understand how to safely perform duties assigned to them.
13.4. Contractor shall review its training procedures annually, and shall any revisions in writing to the City.
13.5. Contractor shall provide ongoing training at least once per year. Contractor shall ensure that all assigned employees attend this annual training.
14. Professional Behavior
14.1. Contractor shall be responsible for the conduct, demeanor and appearance of its employees while on or about the job site or while acting in the course and scope of employment.
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
14.2. Contractor's employees shall be neat and clean, and shall act in a courteous and professional manner. No employee shall use improper language or act in a loud, offensive, or otherwise improper manner.
14.3. Contractor's employees shall be trained as to the requirements of their positions and the importance of performing their jobs according to the City's instructions.
14.4. Contractor's employees shall be all times polite and courteous in their dealings with City staff and members of the public, treating them with patience and respect.
14.5. Contractor's employees shall speak clearly and in a professional manner while interacting with members of the public, offering the assistance needed by each person.
14.6. Contractor shall submit any complaints received against it to the City immediately.
15. Safety
15.1. Safety Plan: Contractor uses the following procedures and documentation to ensure compliance with SVP, Contractor and OSHA safety requirements and regulations.
15.1.1. Contractor's Field Safety & Operations Manual is the top-level procedure that establishes Contractor's safety policy, requirements, and documentation.
15.1.2. Contractor develops a site-specific Health & Safety Plan (HASP) for each site it works on in advance of mobilization.
15.1.3. Contractor develops an outage specific Job Safety Analysis (JSA) for each outage it performs based upon the outage specific work scope details and utilizes this document on a daily and task basis during the execution of the work.
15.1.4. Contractor is registered and approved by ISNetWorld and Avetta to perform Field Services at multiple facilities.
15.1.5. Contractor's scope for the Scope included in this Exhibit includes provision for a full-time site safety coordinator to ensure the safe execution of all maintenance activities.
15.2. Contractor, its employees, and any subcontractors shall always act in a safe manner while on City property.
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
15.3. Contractor shall be responsible for creating a safe work environment for all personnel and City employees as well as for traffic control at the job site.
15.4. Contractor's safety provisions shall be in accordance with all applicable federal, state, county, and local laws, ordinances and codes.
15.5. Contractor shall be responsible for remaining up to date on all applicable federal, state, county, and local laws, ordinances and codes in the event they are amended. Where any amended applicable laws or ordinances are in conflict with the City's requirements, the more stringent requirement(s) shall be followed. Contractor's failure to be thoroughly familiarized with the safety provisions shall not relieve Contractor from compliance with the obligations and penalties resulting therefrom.
15.6. Contractor shall provide and maintain an Injury and Illness Prevention Program (IIPP) pursuant to Title 8, Section 3203 of the California Administrative Code. The program shall include, but not be limited to, a safety training program instructing Contractor's employees in general safe work practices and shall include specific instructions with regard to hazards unique to the employee's job assignment. A copy of the Contractor's IIPP shall be submitted to the City, and be made available on-site upon request.
15.7. Contractor shall schedule periodic safety inspections to identify and correct unsafe conditions and work practices. The City reserves the right to accompany Contractor during these inspections.
15.8. Contractor's employees (including any subcontractors) shall not use or possess alcohol, narcotics, firearms, or drugs of any nature other than medical (for which the Contractor's employee has a current doctor's prescription) on City property and while performing services for the City.
Employees using prescribed medication will not engage in any work if the medication can potentially impair the employee's ability to perform the work safely.
15.9. Contractor's employees (including any subcontractors) shall utilize appropriate Personal Protective Equipment (PPE) and Fire Resistant (FR) clothing, as required. Contractor shall provide the required PPE and FR clothing at its own expense.
15.10. Contractor shall provide work and traffic signage as required to warn pedestrians and vehicular traffic of work in progress. Contractor may be required to direct pedestrians and traffic around the work area. Contractor shall also be responsible for providing all equipment and personnel necessary to properly perform the traffic control measures, including but not limited to, flaggers, cones, reflectors, and electronic signs.
15.11. Contractor shall immediately remove any personnel who is acting in an unsafe or dangerous manner.
Amendment No. 3 to Agreementl'Allied Power Group Page 31 of 47 Rev. 10/25/19
15.12. Contractor shall notify the City immediately in event of an injury or property damage that occurs during the performance of the services described in this Exhibit A. Contractor shall investigate the reported injury or damage upon request from the City, and provide the City with regular updates until the investigation is resolved. The City reserves the right to perform its own investigation. Should the City choose to conduct its own investigation, Contractor shall assist the City as required.
16. Tools and Equipment
16.1. Contractor is responsible for identifying all tools and equipment necessary to perform work. The City will not loan tools or equipment to the Contractor.
16.2. All equipment shall be operated and well-maintained in a satisfactory condition at all times and in compliance with state and federal regulations including, but not limited to, the Occupational Safety and Health Administration (OSHA).
16.3. The City may suspend work where they observe that proper tools and equipment are not being used.
17. Workmanship
17 .1. Contractor shall perform the required services in an environmentally responsible manner.
17.2. Contractor shall assume full responsibility for the protection and safekeeping of material and tools stored at the site, and shall lock all Contractor vehicles when parked and unattended, to prevent unauthorized use. Contractor shall not leave vehicles or equipment unattended with the motor running or the ignition key in place.
17 .3. Contractor shall take all necessary precautions to protect City and private property from damage during the performance of the required services.
Contractor shall be responsible for the repair of any property damaged during the performance of services. Damage to City property that cannot be repaired shall be replaced at the Contractor's sole expense, prior to issuance of payment to the Contractor by the City. Any expenses incurred by the City to repair property damage will be deducted from the Contractor's compensation.
17.4. Contractor will make all reasonable efforts to minimize obstructions and inconvenience to private property owners. These efforts may include, but not be limited to, rescheduling work at a property owner's request, and removing all waste in a timely manner.
17 .5. Contractor will make all reasonable efforts to minimize obstructions and inconvenience to public traffic. Contractor shall comply with all City, County, Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
and State traffic control requirements, including the State of California Manual of Traffic Controls for Maintenance and Work Zones, most current version (Part 6 of California Manual of Uniform Traffic Control Devices), including all revisions.
17.6. Contractor shall keep their work site(s) free from all surplus material, waste material, dirt and rubbish caused by Contractor's performance of services.
17.7. Contractor shall leave the work site in a neat and orderly condition. All cleanup work will be done to the satisfaction of the City, and at the sole expense of Contractor.
17.8. Upon the end of the workday, or suspension of work, Contractor shall remove all equipment and obstructions from any property typically open for use by public traffic. Any incomplete work shall be secured in a manner that does not present a hazard to the City or public.
17.9. The City shall have the right to inspect any work performed by the Contractor and any subcontractors. Should the City determine upon inspection any unsatisfactory or defective work, the Contractor shall immediately correct the work at no additional cost to the City.
17 .10. The City shall not perform any work for Contractor except in an emergency situation or as determined necessary by the City such as, but not limited to adequately protect the City's electrical or other facilities or to restore work area to a safe condition. The City will be reimbursed for any work done for the Contractor (deduction from the Contract or invoice to Contractor at the sole discretion of the City). This will include all costs (direct straight time or overtime wages, all overhead, administration, engineering, vehicle, and equipment costs).
18. Warranty
18.1. Manufacturer's warranty shall apply to all parts.
18.2. Parts repaired or sold by APG shall include manufacturer's warranty and, unless manufacturer's warranty is longer, Contractor's warranty includes the following: 80 starts or eighteen (18) months from date of shipment for parts that are placed in storage to use as spares whichever is less.
18.3. Labor shall be warranted for twelve (12) months from the date of startup.
18.4. Contractor shall correct any deficiencies and/or errors in Contractor's work discovered during the warranty period, at no cost to the City.
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
AGREEMENT FOR SERVICES BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA AND ALLIED POWER GROUP
EXHIBIT A - 2 - FOREIGN MATERIALS EXCLUSION (FME) WORK INSTRUCTION SECTION 10 - FME Work Instruction 335
1. PURPOSE
1.1 The purpose of this document is to provide procedures and guidelines to ensure all foreign materialsare accounted for before, during, and after completion of work on Steam/Gas Turbine and/or Generators. This work instruction will be followed to ensure system startup after maintenance is completed safely without damage to the equipment or injury to personnel.
1.2 Pre-outage briefings will emphasize to the APG workforce at each jobsite that APG will not retaliate against anyone who inadvertently drops any foreign material into a system or machine so long as theemployee reports the incident immediately for proper documentation and corrective action.
2. DEFINITIONS
2.1. FME: Foreign Material Exclusion: Work instructions developed to ensure no foreign objects or materials are left in a system or machine that would cause damage upon startup of the system after maintenance operations.
2.2. Foreign Material: Material that is not part of the system of machinery and ii is not used or present during normal operation.
2.3. FOO: Foreign Object Damage: Damage caused to a system or machinery due to foreign material left in a machine after maintenance operations.
2.4. Drop Notification Record: Record of tools and/or parts that are accidently dropped into a system or machine that cannot be immediately retrieved and removed from the machine. All items on this record will be accounted for and removed prior to system startup.
2.5. Clean Pocket Area: Work area that requires removal of all items that could fall out of any pocket while completing any task within the work area.
3. GENERAL REQUIREMENTS
3.1. All parts removed or installed during maintenance operations will be accounted for.
3.2. All tools in the work area will be specific to the job task being completed at that time.
3.3. Personnel access to the work area will be controlled to minimize introduction of foreign material into the work area.
3.4. The jobsite area will be kept clean and orderly for the entire job to minimize introduction of foreign material to the work area.
Amendment No. 3 to Agreement/'Allied Power Group
Rev. 10/25/19
3.5. Covering of pipe flanges will be accomplished by using bags or plastic over the flanges and any tape used will be wrapped around the backside of the flange. Inserting plastic or rags in a hole will be avoided if possible. If plugging of a hole with plastic or a rag is required, the plastic/rag will have a safety line attached to it and tied off outside the cavity area.
4. PART CONTROL
4.1. All parts will be counted as they are removed from the system or machine.
Special care should be taken with non-ferrous metal parts which cannot be retrieved via a magnet from the system or machine.
4.2. All parts will be labeled, tagged, and /or segregated in the work area to ensure proper identification of parts during the installation phase of the job task.
4.3. Personnel performing specific tasks in a work area will maintain a Drop Notification Record for all parts that are dropped in the system of machine that cannot be immediately retrieved and removed from the system. As dropped items are removed from the system, they will be crossed off the Drop Notification Record. A job is not considered complete until the Drop Notification Record has been cleared.
5. TOOL CONTROL
5.1. Only tools required to complete a specific task will be carried into the jobsite work area. After completion of a specific task, all tools used during that task will be removed from the work area.
5.2. All tools will be tied off using appropriate lanyard material. This lanyard will ensure tools are not dropped into the system or machine which will cause possible damage to the machine or require additional labor to remove the tools from the machine.
5.3. No tools will be set down on the horizontal joints within the machine during on-going maintenance operations.
5.4. Personnel performing specific tasks in a work area will maintain a Drop Notification Record for all parts that are dropped in the system of machine that cannot be immediately retrieved and removed from the system. As dropped items are removed from the system, they will be crossed off the Drop Notification Record. A job is not considered complete until the Drop Notification Record has been cleared.
5.5. All tool sets will be inventoried at the completion of every job to ensure all tools used during the job have been removed from the system and accurately accounted for.
6. ENHANCED CONTROL AREA
APG endeavors to control foreign materials with good work practices and does not require enhanced control areas. If a customer has a requirement for an enhanced control area that requires fencing, tool andmaterial logging, full time Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
attendant or any other advanced control methods APG will support this effort as directed by the customer. Support for enhanced control methods may cause project delays and/or additional cost that would need to be detailed in the purchase order, contract or extra work document.
7. PERSONNEL
7.1. Only APG personnel, APG subcontractors, and authorized customer representatives are allowed within the work area under contract by APG.
Appropriate barricades or work area identifiers will be used to properly control access to the APG contract work area.
7.2. All APG contracted work areas are considered clean pocket areas. Any object that could fall out of a pocket into the system or machine must be removed prior to entry into the work area.
8. GENERAL HOUSEKEEPING
Good housekeeping is an essential part of foreign material exclusion. Poor cleanup or not disposing of general trash can be a source of foreign material in the system and lead to FOD. Guidelines for good housekeeping are as follows:
8.1. Good housekeeping means clean and orderly conditions for the entire job. A place for everything and everything has in its proper place.
8.2. Rubbish, debris, waste, and useless material will be kept cleared from work areas, passageway, and stairs, in and around buildings or other structures.
8.3. All scrap lumber, forms, crates, and other lumber with protruding nails will have nails pulled or beat down immediately upon dismantling.
8.4. Employees removing material having protruding nails will wear heavy gloves and heavy soled boots.
8.5. Containers will be provided for the collection of waste, trash, and other refuse.
Garbage and other waste will be disposed of at regular intervals.
8.6. Oily rags and the like will be kept separate and disposed of separately in metal containers with metal lids and with some water in the bottom.
8.7. Glass drink bottles will not be permitted on the jobsite.
8.8. Lunch and food waste will be disposed of immediately in trash barrels as generated. Eating and/or drinking are not permitted in work areas that could result in the introduction of foreign material into the system or machine.
9. FINAL INSPECTION
9.1. After all work is complete on a system or machine. APG personnel will complete a final inspection for foreign material prior to closing-up the system/machine for normal operations. APG personnel will not spin the shaft or run the system until all foreign material is accounted for.
9.2. All part counts will be verified to be zero-balance.
9.3. A thorough tool inventory will be completed, and all tools will be accounted Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
for.
9.4. All Drop Notification Records will be cleared .
10. RECORDS & FORMS
10.1. All forms shall be considered records and shall be saved . Records of inspection results are to be documented on the standard verification forms which are to be included in the job folder.
10.2. Drop Notification Record , Form F-335-1
10.3. Tool Inventory Lists
10.4. Part Count Lists
10.5. Final Inspection Sign-offs
10.6. Revision History Table
Rev Date Description
0 11/03/17 Initial
Release
Written By
Marty Magby
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
Reviewed Approved By
By
Jimmy Craig Kingsley
Cassell
AGREEMENT FOR SERVICES BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA AND ALLIED POWER GROUP
EXHIBIT A - 4 - OPERA TING DAT A FOR REPLACEMENT ROTOR
Year Service
Hours
2001 32.62
2002 26.93
2003 0.9
2004 0
Jan - Sep 2005 0
Oct- Dec 2005 0
2006 1
2007 0.75
2008 4.95
2009 0.08
2010 0
2011 3.07
2012 0.78
2013 1.57
2014 39.78
2015 8.78
2016 26.75
2017 29.66
2018 25.02
2019 37.77
2020 34.44
Total 274.85
Amendment No. 3 to Agreement/'Allied Power Group
Rev. 10/25/19
Attempted Actual
Starts Starts
22 15
10 7
4 1
0 0
0 0
0 0
1 1
3 3
4 4
1 1
0 0
4 4
3 2
1 1
13 12
7 6
8 8
7 6
4 4
12 12
8 8
112 95
AGREEMENT FOR SERVICES BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA AND ALLIED POWER GROUP
EXHIBIT B - FEE SCHEDULE AND PAYMENT PROVISIONS -
AMENDED JANUARY 12, 2022
1. Maximum Compensation
1.1. _ The maximum amount of compensation to be paid to Contractor under this Agreement shall not exceed the amount specified in Section 6 - Compensation and Payment of the Agreement as Amended
1.2. Any work or materials requested by the City that exceeds the Maximum Compensation shall require the execution of an amendment to this Agreement before the commencement of work.
2. Pricing and Payment
2.1. In the event that site conditions result in increased costs, services shall be provided at the rates outlined in this Exhibit B and Contractor shall follow the Work Authorization process outlined in Exhibit A- Section 8.
2.2. All pricing uses the terms and rates in this Agreement and are quoted in USD (United States Dollars) unless otherwise specified in writing.
2.3. Pricing based on scope of work in the Agreement and Amendments is as outlined below:
Item Scope Cost
A Firm-Fixed Work Scope
Exhibit A to Frame 5 Major inspection Unit 1 (Firm Fixed for $1 ,592,800.00 Agreement the quoted scope of work in Section 1 of Exhibit Section 1 A to Agreement)
Exhibit A-3 to Frame 5 Major inspection Unit 2 (Firm Fixed for $1,569,841.09 Amendment the quoted scope of work in Section 1 of Exhibit No. 3 A to Amendment No. 3 to Agreement)
Section 1
Exhibit A-4 to Purchase of Rotor - Exhibit A-4 to Amendment $804,425.00 Amendment No. 3 to Agreement
No.3
B Additional Services:
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
Item I Scope Cost
Additional Services are subject to the provisions of Section 8 of $5,032,933.91 Exhibit A and shall not exceed unless an amendment to this agreement is executed by the Parties. This includes additional services previously authorized under the Agreement and
Amendment No. 1.
NOT TO EXCEED MAXIMUM COMPENSATION FOR ALL $9,000,000.00
WORK INCLUDING PARTS, MATERIALS, SALES TAX,
FREIGHT, SUBCONTRACTED SERVICES, AND LABOR
3. Labor Rates:
3.1. For services not included in the Firm Fixed Scope of work, T&M rates apply, Contractor shall quote using the rates in this Exhibit and following the process in Section 8 of Exhibit A:
3.1.1. Hours during single daily shift - ten (10) hours per day Technical Advisor/ PM $190.00 $240.00 $240.00
Safety Coordinator $135.00 $170.00 $170.00
Millwright Supervisor $160.00 $220.00 $220.00
Millwright Foreman $150.00 $210.00 $210.00
Millwright Journeyman $128.00 $168.00 $207.00
Specialty Technician $200.00 $250.00 $250.00
3.1.2. Hours outside of single daily shift- in excess (10) hours per day Technical Advisor/ PM $192.00 $242.00 $242.00
Safety Coordinator $137.00 $172.00 $172.00
Millwright Supervisor $162.00 $222.00 $222.00
Millwright Foreman $152.00 $212.00 $212.00
Millwright Journeyman $130.00 $170.00 $209.00
Specialty Technician $203.00 $252.00 $252.00
3.2. Rates for additional subcontractors or crafts / trades required for this scope of services shall be quoted and authorized using the process in Section 8 of Exhibit A
3.3. Definitions:
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
Page40 of47
3.3.1. Straight time shall be eight (8) hours per day, Monday through Friday except on federal holidays.
3.3.2. Hours in excess of eight (8) hours Monday through Friday and all hours on Saturday shall be billed at Overtime rates.
3.3.3. Hours on Sundays and Federal holidays shall be billed at double time rates. Holidays are defined as: New Year's Day, Martin Luther King Day, Washington's Birthday, Memorial Day,
Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
3.3.4. Night Shift Differential applies between 7pm and 7am
3.4. Minimum billable hours are eight (8) hours per day except holidays
3.5. Standby Time: If Contractor staff is required to be available for call-in on weekends or holidays, Contractor may invoice at straight time.
3.6. Travel
3.6.1. Contractor may quote and invoice Per Diem as further defined in Section 3 of this Exhibit B for non-local resources every day that a contractor employee is assigned to the City, including travel until individual is released from the job site (demobilized).
3.6.2. Contractor may invoice travel time based on straight time for all non-local resources when services are provided at SVP's location.
4. Equipment:
4.1. For equipment not included in the firm fixed (base) scope of work, equipment shall be quoted and invoiced based on the below table:
Major Set (Steam/Gas)
HGP Tool Set
Combustion Inspection
(Cl) Tool Set/Minor
Generator Tool Set
Company Truck
$1,500
$1,000
$ 750
$1,000
$ 250
$250/day
$200/day
$150/day Cost
$250/day +15%
Fuel cost +15%
4.2. Tool rental charges start when the tools are off loaded at site and apply until tools are shipped from site.
5. Reimbursable Expenses
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
Page41 of 47
5.1. If included in a quote, Contractor may submit invoices for reimbursement of expenses set forth below, subject to the following conditions. Travel is included in the firm fixed scope of work.
5.2. Expenses shall be reimbursable only to the extent that the Contractor submits sufficient documentation to the City that the expenses were directly incurred in providing the required services and are not included in a fixed cost for such services.
5.3. The following expenses shall be reimbursable by the City.
5.3.1 . Travel-related expenses (mileage, lodging, meals, etc.);
5.3.1.1. Unless approved in writing (e-mail acceptable) in advance, meals, lodging, and related Per Diem shall not exceed the rates outlined by United States General
Services Administration (GSA).
https://www.gsa.gov/travel-resources
5.3.1.2. The City shall not reimburse local travel (within Santa Clara County).
5.3.2. The rental of any specialized equipment to the extent the City has preapproved, in writing, the cost of such rental.
5.3.3. The cost of mailing, shipping and/or delivery of any documents or materials on behalf of the City.
5.3.4. Any other expenses expressly identified as being reimbursable.
5.3.5. Contractor shall quote and invoice mileage based on the current IRS rate.
5.4. Except as specified above, the City will reimburse these expenses at actual cost plus 15%.
6. Invoicing and Payment
6.1. Contractor shall submit an invoice to the City monthly, in arrears, for payment for services performed the previous month, pursuant to this Agreement.
6.2. Contractor shall invoice Additional Services in accordance with approved quotes and the rates listed in this Exhibit B-1 .
6.3. Each invoice shall include the task costs for the previous month.
6.4. The City shall review the invoice submitted by Contractor and shall notify Contractor of any discrepancies or deficiencies in said invoice.
Amendment No. 3 to AgreemenU*Allied Power Group
Rev. 10/25/19
6.5. If the City disputes an expense in an invoice, the City may deduct the disputed expense from the payment of that invoice, provided that the City submits to the Contractor a written explanation of why the expense is being disputed.
6.6. If there are no discrepancies or deficiencies in the submitted invoice and Contractor has submitted all required Certified Payroll using LCP Tracker or such other system as defined by City, City shall process the invoice for payment.
Amendment No. 3 to Agreement/' Allied Power Group
Rev. 10/25/19
AGREEMENT FOR SERVICES BETWEEN THE
CITY OF SANT A CLARA, CALIFORNIA AND ALLIED POWER GROUP EXHIBIT B-1 - NOT TO EXCEED PRICING FOR ADDITIONAL SERVICES The following are not to exceed costs for likely additional services.
Each of the following as well as any identified additional services not on the list shall be authorized using the process outlined in Section 8 of Exhibit A.
T&M Options for Unit 1 - Amendment No 1 - Executed August 19, 2021 Unit Rotor transported to APG Houston shop to remove
1 RO blades, if required.
Not to Exceed Pricing includes outbound and return
shipping, shop labor toremove/replace RO blades -
DOES NOT INCLUDE RO BLADES
2 Remove and replace RO blades on site (if T&M Option B1 is not required)
3 Refurbish Load Gear bearings if required.
Not to Exceed Pricing includes shipping
4 Refurbish #1 bearing if required
Not to Exceed Pricing includes shiooing
5 Exhaust skin and insulation if exhaust insulation can't be reused 6 Expansion joints and weather stripping if required.
7 Shop Repair of all pumps
Not to Exceed Pricing includes shipping
Firm Fixed Work Scope includes removal,
installation, and alignment
8 Shop Repair of all motors
Not to Exceed Pricing includes shipping
Firm Fixed Work Scope includes removal,
installation, and alignment
9 Vibration Analysis at start up if required
10 Demobilization costs, if required
11 Estimated TIL work (actuals may be slightly lower based on outageschedule and time constraints)
12 On site drilling of the stage 1 and 2 shroud blocks to install locatorpins (if required)
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
$67,000.00
$13,200.00
$51,000.00
$10,200.00
$12,600.00
$22,000.00
$55,000.00
$55,000.00
$27,500.00
$46,500.00
$83,000.00
$27,500.00
Page44 of47
T&M Options for Unit 2 - Amendment No 3
A3.1 Unit Rotor transported to APG Houston shop to
remove RO blades, if required. (includes outbound
and return shipping, shop labor to remove/replace RO
blades - NOTE: RO blades not included)
A3.1a Remove and replace RO blades on site (if T&M
Option A3.1 is not required)
A3.2 Repair of SVP rotor currently in Unit 2, rotor would be in shop 5-6 weeks.
Inspection and Field Operations ($42,462.00}, Anti-Rock coating Stg 1 & 2 stacked ($42,900.00), Compressor coating stacked ($50,267.00), Anti-corrosion coating stacked ($26,000.00) Rotor Options
A3.3a Break marriage coupling & remarry
A3.3b Unstack/Restack compressor section
A3.3c Unstack/Restack turbine section
A3.3d New Marriage bolt kit:
A3.3e New Compressor through bolt kit
A3.3f New Turbine through bolt kit
A3.4 Exhaust skin and insulation repairs, if required.
A3.5 Vibration Analysis at start up if required
A3.6 Demobilization costs, if required
A3.7 Estimated TIL work (actuals may be slightly lower based on outa~e schedule and time constraints)
Parts Repair
A3.8a 1st Stage Nozzle Inspection (per set)
Amendment No. 3 to AgreementrAl!ied Power Group
Rev. 10/25/19
$67,000.00
$13,200.00
$161,629.00
$27,500.00
$47,269.00
$33,885.00
$5,253.00
$17,298.00
$8,234.00
$120,000.00
$25,000.00
$46,500.00
$20,000.00
$3,550.00
T&M Options for Unit 2 - Amendment No 3
A3.8b 1st Stage Nozzle Repairs {per set)
A3.9a 2nd Stage Nozzle & Diaphragm Inspection {per set) A3.9b 2nd Stage Nozzle & Diaphragm Repairs (per set)
A3.10a 1st Stage Shroud Inspection (per set)
A3.10b 1st Stage Shroud Repairs (per set)
A3.11a 2nd Stage Shroud Inspection (per set)
A3.11b 2nd Stage Shroud Repairs (per set)
A3.12a 1st Stage Bucket Inspection (per set)
A3.12b 1st Stage Bucket Repairs (per set)
A3.13a 2nd Stage Bucket Inspection (per set)
A3.13b 2nd Stage Bucket Repairs (per set)
A3.14a Transition Pieces Inspection (per set)
A3.14b Transition Pieces Repair (per set)
Transition Pieces Additional Parts I SeNices
A3.14c Replace Inner Floating Seal (each)
A3.14d Replace Inner Fixed Seal (each)
A3.14e Replace Outer Fixed Seal (each)
A3.14f Apply Full ID TBC (per set)
A3.15a F5 Combustion Liner Inspection
A3.15b F5 Combustion Liner Repair
Combustion Liner Additional Parts I SeNices
A3.15c Replacement Spring Seals (each)
Amendment No. 3 to Agreement/*A!lied Power Group
Rev. 10/25/19
$41,150.00
$4,550.00
$43,570.00
$2,000.00
$26,100.00
$2,000.00
$26,100.00
$3,050.00
$34,950.00
$3,050.00
$28,810.00
$3,100.00
$21,350.00
$345.00
$300.00
$315.00
$6,300.00
$3,450.00
$18,890.00
$375.00
Page46 of47
T&M Options for Unit 2 - Amendment No 3
A3.15d Replacement Cowl Caps (each)
A3.15e Apply TBC (per set)
A3.16a FR5 - Fuel Nozzles - Standard DF Inspection (per set) A3.16b FR5 - Fuel Nozzles - Standard DF Repair (per set) FR5 Additional Parts I Services
A3.16c Tip OD Restoration (each)
A3.16d Liquid Cartridge (each)
Amendment No. 3 to Agreement/*Allied Power Group
Rev. 10/25/19
$995.00
$6,300.00
$6,400.00
$12,600.00
$575.00
$635.00
Page47 of47
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1206 Agenda Date: 12/6/2022
REPORT TO COUNCIL
SUBJECT
Action on Amendments to Agreements with DKS, Kimley-Horn, and W-Trans for Traffic Engineering Support
COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure
BACKGROUND
The Department of Public Works (DPW) Traffic Division performs various services for the City, including multimodal transportation planning, reviewing development proposals and traffic impact analyses, approving construction traffic control plans, investigating public requests, operating and monitoring traffic signals, applying for and administering transportation grants, and implementing transportation capital projects. Based on available staffing resources and to keep up with the workload, it is necessary to use consultants to assist with these services.
Funding of $250,000 was included in the Adopted Biennial Capital Improvement Program (CIP) Budget for FY 2020/21 and FY 2021/22 for a transportation project titled, Traffic Engineering Consultant Support (Project No. 1256). Of this amount, $100 was carried over to FY 2022/23. This project provides funding for consultants to assist DPW staff in performing the services described above.
On July 13, 2021, the Council authorized agreements with DKS Associates, Kimley-Horn and Associates, Inc., and Whitelock & Weinberger Transportation, Inc. dba W-Trans for traffic engineering consulting support (Attachments 1, 2, and 3). Each agreement was for a not-to-exceed amount of $83,300 with the cumulative compensation of all three agreements not to exceed $249,900. The terms of the agreement also included extension options over the next two years based on future budgets.
DISCUSSION
Since July 2021, the three firms have successfully completed various tasks to assist staff. These tasks include:
· Analyses of 25 requests from the public regarding traffic calming, stop signs, and intersection visibility
· Preparing an Active Transportation Program (ATP) grant application · Preparing design plans for bicycle lane enhancements
· Processing and entering speed limit study data for 50 locations City of Santa Clara Page 1 of 4 Printed on 12/2/2022
powered by Legistar™
22-1206 Agenda Date: 12/6/2022
· Reviewing traffic impact analyses for Kylli-Mission Point, 2901 Tasman, and other developments
· Calculating and implementing updated traffic signal timing parameters for 156 locations · Reviewing 20 encroachment permits
DKS Associates, Kimley-Horn and Associates, Inc., and W-Trans have been delivering quality services to the City and staff is recommending that they continue providing traffic engineering support. The initial $249,900 in the agreements from FY 2020/21 and FY 2021/22 is almost expended and amendments are necessary to add additional funding from the FY 2022/23 and FY 2022/24 Adopted Biennial CIP budget. Staff is requesting approval of the proposed amendments (Attachments 4, 5, and 6) to add funding in the amount of $66,700 to each agreement to allocate additional funding in the amount of $200,100. The proposed amendments will result in an amended not-to-exceed amount of $450,000 ($150,000 for each agreement) and the consultants work will be performed on a time and materials basis. The revised term for each agreement will end on July 1, 2024.
Table 1: Summary of Agreements and Proposed Amendments
for Traffic Engineering Support
Biennial CIP Budget Total
FY 2020/21 & FY
2021/22
FY 2022/23 & FY 2023/24
Budget Amount $249,900 $200,100 $450,000
Original Agreement Amendment #1Total
1. DKS
Associates
$83,300 $66,700 $150,000
2. Kimley-Horn
and Associates,
Inc.
$83,300 $66,700 $150,000
3. W-Trans, Inc. $83,300 $66,700 $150,000
Total $249,900 $200,100 $450,000
Staff requests approval for City Manager authority to shift funding between the agreements to provide flexibility as on-going needs are matched to the consultant best suited for the scope of work and schedule. Staff also requests City Manager authority to approve time extensions up to July 1, 2026 for each agreement and increase aggregate agreement amounts up to a maximum compensation of $650,000, subject to the appropriation of funds, to account for future budgets related to traffic engineering support needs such as transportation grants, reviewing development proposals and traffic impact analyses, approving construction traffic control plans, and investigating public requests.
ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California City of Santa Clara Page 2 of 4 Printed on 12/2/2022
powered by Legistar™
22-1206 Agenda Date: 12/6/2022
Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines Section 15378(a) as it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.
FISCAL IMPACT
The proposed amendments for traffic engineering consultant support services total $200,100. In the FY 2022/23 and FY 2022/24 Adopted Biennial CIP budget, the Traffic Engineering Consultant Support (1256) project in the Streets and Highways Capital Fund includes funding of $100,100 in FY 2022/23 and $100,000 in FY 2023/24 for a total of $200,100. Since traffic engineering services are ongoing, services will be required for future traffic engineering consultant support needs such as transportation grants, reviewing development proposals and traffic impact analyses, approving construction traffic control plans, and investigating public requests. As a result, additional budget needs may be identified and incorporated into future budget requests. Funding for the agreements beyond the current Adopted Biennial CIP Budget is subject to the appropriation of funds.
COORDINATION
This report has been coordinated with the Finance Department and the City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
1. Approve and authorize the City Manager to execute Amendment No. 1 in the amount of $66,700 to the agreement with DKS Associates for traffic engineering consulting support services, with a term ending on July 1, 2024 and a total amount not-to exceed $150,000;
2. Approve and authorize the City Manager to execute Amendment No. 1 in the amount of $66,700 to the agreement with Kimley-Horn and Associates, Inc. for traffic engineering consulting support services, with a term ending on July 1, 2024 for a total amount not-to exceed $150,000;
3. Approve and authorize the City Manager to execute Amendment No. 1 in the amount of $66,700 to the agreement with Whitelock & Weinberger Transportation, Inc., dba W-Trans, for traffic engineering consulting support services, for a term ending on July 1, 2024 for a total amount not-to exceed $150,000; and
4. Authorize the City Manager to make modifications to the agreements, including time extensions as necessary up to July 1, 2026, and amend the not-to-exceed amounts, as long as the cumulative compensation of all three agreements does not exceed $650,000 subject to the appropriation of funds.
Reviewed by: Craig Mobeck, Director of Public Works
Approved by: Rajeev Batra, City Manager
ATTACHMENTS
1. Agreement with DKS Associates
2. Agreement with Kimley-Horn and Associates, Inc.
City of Santa Clara Page 3 of 4 Printed on 12/2/2022
powered by Legistar™
22-1206 Agenda Date: 12/6/2022
3. Agreement with W-Trans
4. Amendment No. 1 to the Agreement with DKS Associates
5. Amendment No. 1 to the Agreement with Kimley-Horn and Associates, Inc.
6. Amendment No. 1 to the Agreement with W-Trans
City of Santa Clara Page 4 of 4 Printed on 12/2/2022
powered by Legistar™
EBIX Insurance No. S200003669
AGREEMENT FOR DESIGN PROFESSIONAL SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
DKS ASSOCIATES
PREAMBLE
This Agreement is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and OKS Associates, a California corporation, doing business as OKS, (Consultant). City and Consultant may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. City desires to secure the design professional services, more fully described in this Agreement, at Exhibit A, entitled "Scope of Services"; B. "Design professional" includes licensed architects, licensed landscape architects, registered professional engineers and licensed professional land surveyors; C. Consultant represents that it, and its subconsultants, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of City; and,
D. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.
The Parties agree as follows:
AGREEMENT TERMS AND CONDITIONS
1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between City and Consultant shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:
Exhibit A - Scope of Services
Exhibit B - Schedule of Fees
Exhibit C - Insurance Requirements
Exhibit D - Labor Compliance Addendum
Design Professional Agreement with OKS Associates
Rev. 09-28-18
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.
2. TERM OF AGREEMENT
Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2023.
3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Consultant shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence.
4. WARRANTY
Consultant expressly warrants that all materials and services covered by this Agreement shall be fit for the purpose intended, shall be free from defect and shall conform to the specifications, requirements and instructions upon which this Agreement is based. Consultant agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to City when defects are due to the negligence, errors or omissions of Consultant. If Consultant fails to promptly correct or replace materials or services, City may make corrections or replace materials or services and charge Consultant for the cost incurred by City.
5. QUALIFICATIONS OF CONSULT ANT - STANDARD OF CARE
Consultant represents and maintains that it has the expertise in the professional calling necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and City expressly relies upon Consultant's representations regarding its skills and knowledge. Consultant shall perform such Services and duties in conformance to and consistent with the professional standards of a specialist in the same discipline in the State of California.
6. COMPENSATION AND PAYMENT
In consideration for Consultant's complete performance of Services, City shall pay Consultant for all materials provided and Services rendered by Consultant in accordance with Exhibit B, entitled "SCHEDULE OF FEES." The maximum compensation of this Agreement is eighty-three thousand three hundred dollars ($83,300), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and Design Professional Agreement with OKS Associates
Rev. 09-28-18
equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Consultant's expense. Consultant shall not be entitled to any payment above the maximum compensation under any circumstance.
7. TERMINATION
A. Termination for Convenience. City shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days' prior written notice to Consultant.
B. Termination for Default. If Consultant fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, City may terminate this Agreement immediately upon written notice to Consultant.
C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Consultant will deliver to City all City information or material that Consultant has in its possession.
8. ASSIGNMENT AND SUBCONTRACTING
City and Consultant bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of City. Consultant shall not hire subconsultants without express written permission from City.
Consultant shall be as fully responsible to City for the acts and omissions of its subconsultants, and of persons either directly or indirectly employed by them, as Consultant is for the acts and omissions of persons directly employed by it.
9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.
10. INDEPENDENT CONSULTANT
Consultant and all person(s) employed by or contracted with Consultant to furnish labor and/or materials under this Agreement are independent consultants and do not act as agent(s) or employee(s) of City. Consultant has full rights to manage its employees in their performance of Services under this Agreement.
Design Professional Agreement with OKS Associates
Rev. 09-28-18
11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Consultant and all other written information submitted to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant and shall not, without the prior written consent of City, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services. Nothing furnished to Consultant which is otherwise known to Consultant or becomes generally known to the related industry shall be deemed confidential.
12. OWNERSHIP OF MATERIAL
All material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of City but Consultant may retain and use copies thereof. City shall not be limited in any way or at any time in its use of said material. However, Consultant shall not be responsible for damages resulting from the use of said material for work other than Project, including, but not limited to, the release of this material to third parties.
13. RIGHT OF CITY TO INSPECT RECORDS OF CONSUL TANT
City, through its authorized employees, representatives or agents shall have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Consultant for the purpose of verifying any and all charges made by Consultant in connection with Consultant compensation under this Agreement, including termination of Consultant. Consultant agrees to maintain sufficient books and records in accordance with generally accepted accounting principles to establish the correctness of all charges submitted to City. Any expenses not so recorded shall be disallowed by City. Consultant shall bear the cost of the audit if the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the City.
Consultant shall submit to City any and all reports concerning its performance under this Agreement that may be requested by City in writing. Consultant agrees to assist City in meeting City's reporting requirements to the State and other agencies with respect to Consultant's Services hereunder.
14. HOLD HARMLESS/INDEMNIFICATION
To the extent permitted by law, Consultant agrees to protect, defend, hold harmless and indemnify City, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, Design Professional Agreement with OKS Associates
Rev. 09-28-18
Page4
and/or expense or damage, including all costs and attorney's fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, to the extent arising out of, pertaining to, or related to the negligence, recklessness, or willful misconduct of the Consultant, its employees, subconsultants, or agents in the performance, or non-performance, of Services under this Agreement.
15. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Consultant shall provide and maintain in full force and effect, at no cost to City, insurance policies as set forth in Exhibit C.
16. WAIVER
Consultant agrees that waiver by City of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither City's review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.
17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:
City of Santa Clara
Attention: Department of Public Works
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at [email protected] , and
[email protected]
And to Consultant addressed as follows:
OKS Associates
Attention: David Mahama, Project Manager
1970 Broadway, Suite 740
Oakland, CA 94612
and by e-mail at [email protected]
The workday the e-mail was sent shall control the date notice was deemed given.
An e-mail transmitted after 1 :00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.
Design Professional Agreement with OKS Associates
Rev. 09-28-18
18. COMPLIANCE WITH LAWS
Consultant shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to "The Code of the City of Santa Clar:a, California" ("SCCC"). In particular, Consultant's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Consultant has read and agrees to comply with City's Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299).
19. CONFLICTS OF INTEREST
Consultant certifies that to the best of its knowledge, no City officer, employee or authorized representative has any financial interest in the business of Consultant and that no person associated with Consultant has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Consultant is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Consultant will advise City if a conflict arises.
20. FAIR EMPLOYMENT
Consultant shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition , genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.
21. NO USE OF CITY NAME OR EMBLEM
Consultant shall not use City's name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of City.
22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.
Design Professional Agreement with OKS Associates
Rev. 09-28-18
Page6
23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.
24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.
25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
CONTINUED ON PAGE 8
Design Professional Agreement with OKS Associates
Rev. 09-28-18
The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANT A CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form:
City Attorney
\. 1 DEANNA J. ANTANA
\J.J City Mana r
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771 "CITY"
DKS ASSOCIATES California corporation
Dated: os12012021
By (Signature): TIAAff" <Kt..,,.. - - - - - ----------- -- Name: Terry Klim Title: Principal
Principal Place of 720 SW Washington, #500, Portland, OR Business Address: 97205
--- --------- ---- -- Em a i I Address: [email protected] Telephone: (510) 763-2061
Fax: (510) 268-1739
"CONSULTANT"
Design Professional Agreement with OKS Associates
Rev. 09-28-18
EXHIBIT A
SCOPE OF SERVICES
The Services to be performed for the City by the Consultant under this Agreement are set forth below.
I. BACKGROUND
On February 26, 2020, the City of Santa Clara ("City") Public Works Traffic Division released a Statement of Qualifications (SOQ#DPW-15) to create an oncall list of pre-qualified consultants. The resulting list had six (6) firms and the position on the list is not ranked, Advanced Mobility Group, OKS, Hexagon, lteris, Kimley Horn, and W-Trans. On November 16, 2020, the City Public Works Traffic Division released a Request for Proposal to these six (6) firms to receive proposals for these services.
II. BASIC SCOPE OF SERVICES
A. Review Traffic Control Plans
1. Review to ensure compliance with the California Manual on Uniform Traffic Control Devices (CAMUTCD).
2. Verify accuracy of base map including curb alignments, driveway locations, existing striping, existing street signs.
3. Check for proper cone taper length, cone spacing, advance warning signs, accommodation to impacted bike lane, minimum lane width.
4. Check for proposed work hours and avoid lane closure during rush hours.
5. Check for adequacy of work zone or proposed lane closure for maintaining turning movements and traffic signal operations
6. Check to ensure traffic facilities are protected properly B. Traffic Impact Analysis QA/QC Peer Review
1. Review count data, roadway geometry and assumptions made in the traffic study. Ensure that assumptions are reasonable and consistent with VT A guidelines and City policies.
2. Review the analysis of existing, background and cumulative traffic conditions. Ensure that the numbers "add" up.
3. Review the calculated CEQA impacts (VMT, policy consistency, etc.) and non-CEQA impacts (i.e. Level of Service) in accordance with City of Santa Clara and responsible agency policies.
C. Traffic Related Studies
1. Work with City staff to complete various analyses for resident requests such as intersection control warrants, crosswalk requests, and Design Professional Agreement with OKS Associates/ Exhibit A-Scope of Services Rev. 09-28-18
intersection visibility improvement requests.
2. Conduct field visit, when necessary, to observe up to date field conditions.
3. Use City provided traffic count data and collision reports to determine the appropriate solution to the request.
D. Other Services
1. Review other traffic studies, designs, calculations, or standards prepared by the City or other consultants
2. Support grant application activities (scope of work, exhibits/maps, cost estimates, and other calculations) as requested by the City
3. Complete various traffic engineering studies, conceptual design, or preliminary engineering for capital projects
Ill. RESPONSIBILITIES OF CITY
CITY will provide the following information and support regarding the project asavailable and applicable:
• Record drawings (as-available)
• CITY's Standard Details, Specifications, and Design Criteria. • City of Santa Clara's Pedestrian Master Plan 2019
• City of Santa Clara's Bicycle Plan Update 2018
• Traffic count data
• Collision record reports
Design Professional Agreement with OKS Associates/ Exhibit A-Scope of Services Rev. 09-28-18
Page2
EXHIBIT 8
SCHEDULE OF FEES
Contractor will bill City on a monthly basis for Services provided by Contractor during the preceding month on an invoice and in a format approved by City and subject to verification and approval by City. City will pay Contractor within thirty (30) days of City's receipt of an approved invoice.
The schedule of rates includes all billing amounts and costs as follows, such as charges for equipment, travel time and costs, per diem expenses, and expendable material costs.
In no event shall the amount billed to City by Consultant for services under this Agreement exceed $83,300, subject to budget appropriations.
Charges for personnel engaged in services shall be based on the actual hours directly charged to the project.
Rates by classification are listed below and are effective as of July 1, 2021. No adjustment to the rates will be allowed during the term of this Agreement, July 1, 2021 to July 1, 2023, unless otherwise agreed in writing by the City. Billings will show the actual staff name, hours charged, and corresponding classification listed below.
Design Professional Agreement with OKS Associates/ Exhibit 8-Schedule of Fees Rev. 09-28-18
Fee Schedule
Effective January 1, 2021 through December 31, 2021
ENGINEERS a11dPLANNERS TECHNICIANS a11d SUPPORT STAFF
Grade Hourly Rate Grade Hourly Rate Tech Level Hourly Rate Grade 1 $ 55.00 Grade 32 210.00 Tech Level A $ 35.00
Grade 2 60.00 Grade 33 215.00 TechLevelB 40.00
Grade 3 65.00 Grade 34 220.00 Tech Level C 45.00
Grade 4 70.00 Grade 35 225.00 TechLevelD 50.00
Grade 5 75.00 Grade 36 230.00 Tech Level E 55.00
Grade 6 80.00 Grade 37 235.00 Tech Level F 60.00
Grade 7 85.00 Grade 38 240.00 Tech Level G 65.00
Grade 8 90.00 Grade 39 245.00 TechLevelH 70.00
Grade 9 95.00 Grade 40 250.00 Tech Level I 75.00
Grade 10 100.00 Grade 41 255.00 Tech Level J 80.00
Grade 11 105.00 Grade42 260.00 TechLevelK 85.00
Grade 12 110.00 Grade 43 265.00 TechLevelL 90.00
Grade 13 115.00 Grade44 270.00 TechLevelM 95.00
Grade 14 120.00 Grade45 275.00 TechLevelN 100.00
Grade 15 125.00 Grade 46 280.00 Tech Level 0 105.00
Grade 16 130.00 Grade 47 285.00 Tech Level P 110.00
Grade 17 135.00 Grade 48 290.00 Tech Level Q 115.00
Grade 18 140.00 Grade 49 295.00 TechLevelR 120.00
Grade 19 145.00 Grade 50 300.00 Tech Level S 125.00
Grade 20 150.00 Grade 51 305.00 Tech Level T 130.00
Grade 21 155.00 Grade 52 310.00 TechLevelU 135.00
Grade 22 160.00 Grade 53 315.00 TechLevelV 140.00
Grade 23 165.00 Grade 54 320.00 Tech Level W 145.00
Grade 24 170.00 Grade 55 325.00 TechLevelX 150.00
Grade 25 175.00 Grade 56 330.00 TechLevelY 155.00
Grade 26 180.00 Grade57 335.00 Tech Level Z 160.00
Grade 27 185.00 Grade 58 340.00 Tech Level AA 165.00
Grade 28 190.00 Grade 59 345.00 Tech Level AB 170.00
Grade 29 195.00 Grade 60 350.00 Tech Level AC 175.00
Grade 30 200.00 Grade 61 355.00 Tech Level AD 180.00
Grade 31 205.00 Grade 62 360.00 Tech Level AE 185.00
• Project expenses will be billed at cost plus ten percent for service and handling. Project expenses include projectrelated costs such as reproduction through outside services, transportation, subsistence, delivery/postage, and vendor and subcontractor services.
• All invoices are due and payable within 30 days of date of invoice. Invoices outstanding over 30 days will be assessed a 1 1/4 percent service charge, compounded, for each 30 days outstanding beyond the initial payment period. Service charges are not included in any agreement for maximum charges.
Design Professional Agreement with OKS Associates/ Exhibit B-Schedule of Fees Rev. 09-28-18
EXHIBIT C
INSURANCE REQUIREMENTS
Without limiting the Consultant's indemnification of the City, and prior to commencing any of the Services required under this Agreement, the Consultant shall provide and maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the City, at its sole cost and expense, the following insurance policies from insurance companies authorized to do business in the State of California. These policies shall be primary insurance as to the City of Santa Clara so that any other coverage held by the City shall not contribute to any loss under Consultant's insurance. The minimum coverages, provisions and endorsements are as follows:
A. COMMERCIAL GENERAL LIABILITY INSURANCE
1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury
2. Exact structure and layering of the coverage shall be left to the discretion of Consultant; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.
3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Consultant to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a "pay on behalf' basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.
B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than one million dollars ($1,000,000) each accident using, or providing coverage at Design Professional Agreement with OKS Associates/ Exhibit C-lnsurance Requirements Rev. 09-28-18
least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.
In the event that the Work being performed under this Agreement involves transporting of hazardous or regulated substances, hazardous or regulated wastes and/or hazardous or regulated materials, Consultant and/or its subconsultants involved in such activities shall provide coverage with a limit of one million dollars ($1,000,000) per accident covering transportation of such materials by the addition to the Business Auto Coverage Policy of Environmental Impairment Endorsement MCS90 or Insurance Services Office endorsement form CA 99 48, which amends the pollution exclusion in the standard Business Automobile Policy to cover pollutants that are in or upon, being transported or towed by, being loaded onto, or being unloaded from a covered auto.
C. WORKERS' COMPENSATION
1. Workers' Compensation Insurance Policy as required by statute and employer's liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accident/Bodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.
2. The indemnification and hold harmless obligations of Consultant included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Consultant or any subconsultant under any Workers' Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).
3. This policy must include a Waiver of Subrogation in favor of the City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents.
D. PROFESSIONAL LIABILITY
Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Consultant. Covered services as designated in the policy must specifically include work performed under this agreement. Coverage shall be in an amount of not less than one million dollars ($1,000,000) per claim or two million dollars ($2,000,000) aggregate. Any coverage containing a deductible or self-retention must first be approved in writing by the City Attorney's Office.
E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.
Design Professional Agreement with OKS Associates/ Exhibit C-lnsurance Requirements Rev. 09-28-18
1. Additional Insureds. City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents are hereby added as additional insureds in respect to liability arising out of Consultant's work for City, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent.
2. Primary and non-contributing. Each insurance policy provided by Consultant shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the indemnities may possess, including any self-insurance or self-insured retention they may have. Any other insurance indemnities may possess shall be considered excess insurance only and shall not be called upon to contribute with Consultant's insurance.
3. Cancellation.
4. a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided due to non-payment of premiums shall be effective until written notice has been given to City at least ten (10) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal.
b. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided for any cause save and except non-payment of premiums shall be effective until written notice has been given to City at least thirty (30) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least thirty (30) days prior to the effective date of nonrenewal.
Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.
F. ADDITIONAL INSURANCE RELATED PROVISIONS
Consultant and City agree as follows:
1. Consultant agrees to ensure that subconsultants, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Consultant, provide the same minimum Design Professional Agreement with DKS Associates/ Exhibit C-lnsurance Requirements Rev. 09-28-18
insurance coverage required of Consultant, except as with respect to limits. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Consultant agrees that upon request by City, all agreements with, and insurance compliance documents provided by, such subconsultants and others engaged in the project will be submitted to City for review.
2. Consultant agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Consultant for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto.
3. The City reserves the right to withhold payments from the Consultant in the event of material noncompliance with the insurance requirements set forth in this Agreement.
G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Consultant, and each and every subconsultant (of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements and deductibles indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to City and as described in this Agreement. Consultant shall file with the City all certificates and endorsements for the required insurance policies for City's approval as to adequacy of the insurance protection.
H. EVIDENCE OF COMPLIANCE
Consultant or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to City, or its representative as set forth below, at or prior to execution of this Agreement.
Upon City's request, Consultant shall submit to City copies of the actual insurance policies or renewals or replacements. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to City pursuant to this Agreement shall be mailed to:
Design Professional Agreement with OKS Associates/ Exhibit C-lnsurance Requirements Rev. 09-28-18
Page4
EBIX Inc.
City of Santa Clara Public Works Department
P.O. Box 100085- S2 or 1 Ebix Way
Duluth, GA 30096 John's Creek, GA 30097
Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]
I. QUALIFYING INSURERS
All of the insurance companies providing insurance for Consultant shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the City or its insurance compliance representatives.
Design Professional Agreement with OKS Associates/ Exhibit C-lnsurance Requirements Rev. 09-28-18
ci~nx j RightSignature
SIGNATURE
REFERENCE NUMBER
ES 714D4B-8253-4907-8 696-2ECF 142C7 F 33
CERTIFICATE
TRANSACTION DETAILS
Reference Number
ES714D48-8253-4907-B696-2ECF142C7F33
DOCU MEI\IT DETAILS
Document Nall\e
Dks - Agreement Te Support-Draft9
Transaction Type
Signature Request
Sent At
05/20/2021 15:47 EDT
Executed At
05/20/202.1, 16:53 EDT
lden~ty Method
email
Distribution Method
email
Signed Checksum
Signer Sequencing
Disabled
Document Puscode
Disabled
SIGNERS
SIGNER
Name
Teny Jain,
Email
trl<@dksa sso elates, com
Compon11nts
2 TIMESTAM'P
05/20/2021 l.5:47 EDT
05/20/2021 15:47 EDT
osn.012021 16,53 EDT
05/20/2021 16:53 EDT
05/20/2021 16: 53 EDT
AUDIT
E-SIONAlURE
Status
signed
FIiename
dks_-_agreemenUe_support-draft9.pdt
Pages
17 pages
Content Type
appltcatlon/pdf
FIie Site
827 KB
Orlgtrial Checksul'tl
UtnJl,U'fOt14,1'P•IUrto,.il lS4tl 1:UJJUCft U -tct•1~&.Untlit•tiilllU EVENTS
Vl11wed At
05/20/2021 16:53 EDT
Multi-factor Digital Fingerprint Checksum Identity Authenticated At 05/20/2021 16:53 EDT
IP Address
99,167.204.157
Device
Chrome via Windows
Typed Signature
Signature Rcfimince ID
E4GB4 745
Signed At
0S/20/202116:53 EDT
Elizabeth 11,gullar (elizabelt1,[email protected]) created document 'dks_-_agreement_te_s,ipport-drart!l.pdr on Chrome via Windows rrom 50.226.71.86,
Teny Kllm (trk@dksassodates,corn) was emailed a link to sign, Teray !<Jim ([email protected]) viewed the document on Chrome via Windows from 99.167 .204.157.
Terry l<liITT ([email protected]) authen~cated via email on Chrome via Windows from 99.167.204.1S7.
Terry Kllm-(trl:@dksassoclates.com) signed the document on Chrome via Windows from 99.167.204.l57.
EBIX Insurance No. S200003667
AGREEMENT FOR DESIGN PROFESSIONAL SERVICES
BETWEEN THE
CITY OF SANT A CLARA, CALIFORNIA,
AND
KIMLEY-HORN AND ASSOCIATES, INC.
PREAMBLE
This Agreement is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Kimley-Horn and Associates, Inc. a North Carolina corporation, (Contractor). City and Contractor may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. City desires to secure the design professional services more fully described in this Agreement, at Exhibit A, entitled "Scope of Services"; B. "Design professional" includes licensed architects, licensed landscape architects, registered professional engineers and licensed professional land surveyors; C. Contractor represents that it, and its subcontractors, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of City; and,
D. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.
The Parties agree as follows:
AGREEMENT TERMS AND CONDITIONS
1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between City and Contractor shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:
Exhibit A - Scope of Services
Exhibit B - Schedule of Fees
Exhibit C - Insurance Requirements
Exhibit D - Labor Compliance Addendum (if applicable)
Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.
2. TERM OF AGREEMENT
Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2023.
3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Contractor shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence.
A. All reports, costs estimates, plans and other documentation which may be submitted or furnished by Contractor shall be approved and signed by an appropriate qualified licensed professional in the State of California.
B. The title sheet for specifications and reports, and each sheet of plans, shall bear the professional seal, certificate number, registration classification, expiration date of certificate and signature of the design professional responsible for their preparation.
4. WARRANTY
Contractor agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to City when defects are due to the negligence, errors or omissions of Contractor. If Contractor fails to promptly correct or replace materials or services, City may make corrections or replace materials or services and charge Contractor for the cost incurred by City.
5. QUALIFICATIONS OF CONTRACTOR - STANDARD OF CARE
Contractor represents and maintains that it is qualified in the professional calling necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and City expressly relies upon Contractor's representations regarding its skills and knowledge. Contractor shall perform such Services and duties in conformance to and consistent with the professional standards of firms in the same discipline in the State of California.
6. COMPENSATION AND PAYMENT
In consideration for Contractor's complete performance of Services, City shall pay Contractor for all materials provided and Services rendered by Contractor in Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
accordance with Exhibit B, entitled "SCHEDULE OF FEES." The maximum compensation of this Agreement is eighty-three thousand three hundred dollars ($83,300), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor's expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.
7. TERMINATION
A. Termination for Convenience. City shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days' prior written notice to Contractor.
B. Termination for Default. If Contractor fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, City may terminate this Agreement immediately upon written notice to Contractor.
C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Contractor will deliver to City all City information or material that Contractor has in its possession.
D. The Contractor shall have the right to terminate this agreement upon ten days written notice to the City upon breach by City of any of its obligations under this Agreement. In the event of termination, the Contractor shall be paid for all services performed up to the effective date of the termination and all damages, if any, resulting from the City's breach of this Agreement.
8. ASSIGNMENT AND SUBCONTRACTING
City and Contractor bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of City. Contractor shall not hire subcontractors without express written permission from City.
Contractor shall be as fully responsible to City for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is for the acts and omissions of persons directly employed by it.
Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.
10. INDEPENDENT CONTRACTOR
Contractor and all person(s) employed by or contracted with Contractor to furnish labor and/or materials under this Agreement are independent contractors and do not act as agent(s) or employee(s) of City. Contractor has full rights to manage its employees in their performance of Services under this Agreement.
11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Contractor and all other written information submitted to Contractor in connection with the performance of this Agreement shall be held confidential by Contractor and shall not, without the prior written consent of City, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services. Nothing furnished to Contractor which is otherwise known to Contractor or becomes generally known to the related industry shall be deemed confidential.
12. OWNERSHIP OF MATERIAL
All material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of City but Contractor may retain and use copies thereof. City shall not be limited in any way or at any time in its use of said material. However, Contractor shall not be responsible for damages resulting from the use of said material for work other than Project, including, but not limited to, the release of this material to third parties.
13. RIGHT OF CITY TO INSPECT RECORDS OF CONTRACTOR
City, through its authorized employees, representatives or agents shall have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Contractor for the purpose of verifying any and all charges made by Contractor in connection with Contractor compensation under this Agreement, including termination of Contractor. Contractor agrees to maintain sufficient books and records in accordance with generally accepted accounting principles to establish the correctness of all charges submitted to City. Any expenses not so recorded shall be disallowed by City. Contractor shall bear the Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
Page4
cost of the audit if the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the City.
Contractor shall submit to City any and all reports concerning its performance under this Agreement that may be requested by City in writing. Contractor agrees to assist City in meeting City's reporting requirements to the State and other agencies with respect to Contractor's Services hereunder.
14. HOLD HARMLESS/INDEMNIFICATION
To the extent permitted by law, Contractor agrees to protect, defend, hold harmless and indemnify City, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney's fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, to the extent arising out of, pertaining to, or related to the negligence, recklessness, or willful misconduct of the Contractor, its employees, subcontractors, or agents in the performance, or non-performance, of Services under this Agreement.
15. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Contractor shall provide and maintain in full force and effect, at no cost to City, insurance policies as set forth in Exhibit C.
16. WAIVER
Contractor agrees that waiver by City of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither City's review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.
17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:
City of Santa Clara
Attention: Department of Public Works
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at [email protected] and
[email protected]
Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
And to Contractor addressed as follows:
Kimley-Hom and Associates, Inc.
Attention: Randy Durrenberger
1300 Clay Street, Suite 325
Oakland, CA 94612
and by e-mail at [email protected]
The workday the e-mail was sent shall control the date notice was deemed given.
An e-mail transmitted after 1 :00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.
18. COMPLIANCE WITH LAWS
Contractor shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to "The Code of the City of Santa Clara, California" ("SCCC"). In particular, Contractor's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Contractor has read and agrees to comply with City's Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299).
19. CONFLICTS OF INTEREST
Contractor certifies that to the best of its knowledge, no City officer, employee or authorized representative has any financial interest in the business of Contractor and that no person associated with Contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Contractor is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Contractor will advise City if a conflict arises.
20. FAIR EMPLOYMENT
Contractor shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.
Design Professional Agreement with Kirnley-Horn and Associates, Inc.
Rev. 09-28-18
21. NO USE OF CITY NAME OR EMBLEM
Contractor shall not use City's name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of City.
22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.
23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.
24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.
25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
CONTINUED ON PAGE 8
Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
The Parties aclmowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form:
~ tv DEANN J SANTANA
City Attorney City Ma ag r
"CITY"
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
KIMLEY-HORN AND ASSOCIATES, INC
a North Carolina corporation
Dated: S-~2-/~
By (Signa
Name
ture):
:
~~ Ra~u.!!_e~~~ _
Title: Senior Vice President
Principal Place of 1300 Clay Street, Suite 325
Business Address: Oakland, CA 94612
Email Address: [email protected]
Telephone: (510) 625-0712
Fax: (714) 938-0488
"CONTRACTOR"
Design Professional Agreement with Kimley-Horn and Associates, Inc.
Rev. 09-28-18
EXHIBIT A
SCOPE OF SERVICES
The Services to be performed for the City by the Contractor under this Agreement are set forth below.
I. BACKGROUND
On February 26, 2020, the City of Santa Clara ("City") Public Works Traffic Division released a Statement of Qualifications (SOQ#DPW-15) to create an oncall list of pre-qualified consultants. The resulting list had six (6) firms and the position on the list is not ranked, Advanced Mobility Group, OKS, Hexagon, lteris, Kimley Horn, and W-Trans. On November 16, 2020, the City Public Works Traffic Division released a Request for Proposal to these six (6) firms to receive proposals for these services.
II. BASIC SCOPE OF SERVICES
A. Review Traffic Control Plans
1. Review to ensure compliance with the California Manual on Uniform Traffic Control Devices (CAMUTCD).
2. Verify accuracy of base map including curb alignments, driveway locations, existing striping, existing street signs.
3. Check for proper cone taper length, cone spacing, advance warning signs, accommodation to impacted bike lane, minimum lane width.
4. Check for proposed work hours and avoid lane closure during rush hours.
5. Check for adequacy of work zone or proposed lane closure for maintaining turning movements and traffic signal operations
6. Check to ensure traffic facilities are protected properly B. Traffic Impact Analysis QA/QC Peer Review
1. Review count data, roadway geometry and assumptions made in the traffic study. Ensure that assumptions are reasonable and consistent with VT A guidelines and City policies.
2. Review the analysis of existing, background and cumulative traffic conditions. Ensure that the numbers "add" up.
3. Review the calculated CEQA impacts (VMT, policy consistency, etc.) and non-CEQA impacts (i.e. Level of Service) in accordance with City of Santa Clara and responsible agency policies.
C. Traffic Related Studies
1. Work with City staff to complete various analyses for resident requests such as intersection control warrants, crosswalk requests, and intersection visibility improvement requests.
Design Professional Agreement with Kimley-Horn and Associates/Exhibit A-Scope of Services Page 1 Rev. 09-28-18
2. Conduct field visit, when necessary, to observe up to date field conditions.
3. Use City provided traffic count data and collision reports to determine the appropriate solution to the request.
D. Other Services
1. Review other traffic studies, designs, calculations, or standards prepared by the City or other consultants
2. Support grant application activities (scope of work, exhibits/maps, cost estimates, and other calculations) as requested by the City
3. Complete various traffic engineering studies, conceptual design, or preliminary engineering for capital projects
Ill. RESPONSIBILITIES OF CITY
CITY will provide the following information and support regarding the project asavailable and applicable:
• Record drawings (as-available)
• CITY's Standard Details, Specifications, and Design Criteria. • City of Santa Clara's Pedestrian Master Plan 2019
• City of Santa Clara's Bicycle Plan Update 2018
• Traffic count data
• Collision record reports
Design Professional Agreement with Kimley-Horn and Associates/Exhibit A-Scope of Services Page 2 Rev. 09-28-18
EXHIBIT B
SCHEDULE OF FEES
Contractor will bill City on a monthly basis for Services provided by Contractor during the preceding month on an invoice and in a format approved by City and subject to verification and approval by City. City will pay Contractor within thirty (30) days of City's receipt of an approved invoice.
The schedule of rates includes all billing amounts and costs as follows, such as charges for equipment, travel time and costs, per diem expenses, and expendable material costs.
In no event shall the amount billed to City by Consultant for services under this Agreement exceed $83,300, subject to budget appropriations.
Charges for personnel engaged in services shall be based on the actual hours directly charged to the project.
Rates by classification are listed below and are effective as of July 1, 2021. No adjustment to the rates will be allowed during the term of this Agreement, July 1, 2021 to July 1, 2023, unless otherwise agreed in writing by City.
Staff Classification Hourly Rate
Principal $325
Sr. Professional 5 $295
Sr. Professional 4 $280
Sr. Professional 3 $265
Sr. Professional 2 $255
Sr. Professional 1 $245
Sr. Professional $235
Professional 4 $225
Professional 3 $215
Professional 2 $205
Professional 1 $195
Professional $185
Analyst 4 $170
Analyst 3 $160
Analyst 2 $150
Analyst 1 $140
Sr. CADD $130
CADD $120
Sr. Support Staff 2 $125
Sr. Support Staff 1 $115
Support Staff 2 $105
Support Staff 1 $100
Design Professional Agreement with Kimley-Horn and Associates/Exhibit B-Schedule of Fees Page 1 Rev. 09-28-18
EXHIBIT C
INSURANCE REQUIREMENTS
Without limiting the Consultant's indemnification of the City, and prior to commencing any of the Services required under this Agreement, the Consultant shall provide and maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the City, at its sole cost and expense, the following insurance policies from insurance companies authorized to do business in the State of California. These policies shall be primary insurance as to the City of Santa Clara so that any other coverage held by the City shall not contribute to any loss under Consultant's insurance. The minimum coverages, provisions and endorsements are as follows:
A. COMMERCIAL GENERAL LIABILITY INSURANCE
1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury
2. Exact structure and layering of the coverage shall be left to the discretion of Consultant; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.
3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Consultant to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a "pay on behalf' basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.
B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than one million dollars ($1,000,000) each accident using, or providing coverage at Design Professional Agreement with Kimley-Horn and Associates/Exhibit C-lnsurance Requirements
Rev. 09-28-18
least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.
In the event that the Work being performed under this Agreement involves transporting of hazardous or regulated substances, hazardous or regulated wastes and/or hazardous or regulated materials, Consultant and/or its subconsultants involved in such activities shall provide coverage with a limit of one million dollars ($1,000,000) per accident covering transportation of such materials by the addition to the Business Auto Coverage Policy of Environmental Impairment Endorsement MCS90 or Insurance Services Office endorsement form CA 99 48, which amends the pollution exclusion in the standard Business Automobile Policy to cover pollutants that are in or upon, being transported or towed by, being loaded onto, or being unloaded from a covered auto.
C. WORKERS' COMPENSATION
1. Workers' Compensation Insurance Policy as required by statute and employer's liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accidenUBodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.
2. The indemnification and hold harmless obligations of Consultant included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Consultant or any subconsultant under any Workers' Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).
3. This policy must include a Waiver of Subrogation in favor of the City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents.
D. PROFESSIONAL LIABILITY
Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Consultant. Covered services as designated in the policy must specifically include work performed under this agreement. Coverage shall be in an amount of not less than one million dollars ($1,000,000) per claim or two million dollars ($2,000,000) aggregate. Any coverage containing a deductible or self-retention must first be approved in writing by the City Attorney's Office.
E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.
Design Professional Agreement with Kimley-Horn and Associates/Exhibit C-lnsurance Requirements
Rev. 09-28-18
1. 2.
Additional Insureds. City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents are hereby added as additional insureds in respect to liability arising out of Consultant's work for City, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 1 O 01, or its equivalent.
Primary and non-contributing. Each insurance policy provided by Consultant shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the indemnities may possess, including any self-insurance or self-insured retention they may have. Any other insurance indemnities may possess shall be considered excess insurance only and shall not be called upon to contribute with Consultant's insurance.
3. Cancellation.
4. a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided due to non-payment of premiums shall be effective until written notice has been given to City at least ten (10) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal.
b. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided for any cause save and except non-payment of premiums shall be effective until written notice has been given to City at least thirty (30) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least thirty (30) days prior to the effective date of nonrenewal.
Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.
F. ADDITIONAL INSURANCE RELATED PROVISIONS
Consultant and City agree as follows:
1. Consultant agrees to ensure that subconsultants, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Consultant, provide the same minimum Design Professional Agreement with Kimley-Horn and Associates/Exhibit C-lnsurance Requirements
Rev. 09-28-18
insurance coverage required of Consultant, except as with respect to limits. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Consultant agrees that upon request by City, all agreements with, and insurance compliance documents provided by, such subconsultants and others engaged in the project will be submitted to City for review.
2. Consultant agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Consultant for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto.
3. The City reserves the right to withhold payments from the Consultant in the event of material noncompliance with the insurance requirements set forth in this Agreement.
G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Consultant, and each and every subconsultant (of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements and deductibles indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to City and as described in this Agreement. Consultant shall file with the City all certificates and endorsements for the required insurance policies for City's approval as to adequacy of the insurance protection.
H. EVIDENCE OF COMPLIANCE
Consultant or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to City, or its representative as set forth below, at or prior to execution of this Agreement.
Upon City's request, Consultant shall submit to City copies of the actual insurance policies or renewals or replacements. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to City pursuant to this Agreement shall be mailed to:
Design Professional Agreement with Kimley-Horn and Associates/Exhibit C-lnsurance Requirements
Rev. 09-28-18
EBIX Inc.
City of Santa Clara Public Works Department
P.O. Box 100085 - S2 or 1 Ebix Way
Duluth, GA 30096 John's Creek, GA 30097
Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]
I. QUALIFYING INSURERS
All of the insurance companies providing insurance for Consultant shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the City or its insurance compliance representatives.
Design Professional Agreement with Kimley-Horn and Associates/Exhibit C-lnsurance Requirements
Rev. 09-28-18
EBIX Insurance No. S200004220
AGREEMENT FOR DESIGN PROFESSIONAL SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
WHITELOCK & WEINBERGER TRANSPORTATION, INC., DBA W-TRANS
PREAMBLE
This Agreement is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Whitlock & Weinberger Transportation, Inc., a California corporation, doing business as W-Trans, (Consultant). City and Consultant may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. City desires to secure the design professional services, more fully described in this Agreement, at Exhibit A, entitled "Scope of Services"; B. "Design professional" includes licensed architects, licensed landscape architects, registered professional engineers and licensed professional land surveyors; C. Consultant represents that it, and its subconsultants, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of City; and,
D. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.
The Parties agree as follows:
AGREEMENT TERMS AND CONDITIONS
1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between City and Consultant shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:
Exhibit A - Scope of Services
Exhibit B - Schedule of Fees
Exhibit C - Insurance Requirements
Exhibit D - Labor Compliance Addendum
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. DBA W-Trans Page 1 Rev. 09-28-18
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.
2. TERM OF AGREEMENT
Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2023.
3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Consultant shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence.
4. WARRANTY
Consultant expressly warrants that all materials and services covered by this Agreement shall be fit for the purpose intended, shall be free from defect and shall conform to the specifications, requirements and instructions upon which this Agreement is based. Consultant agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to City when defects are due to the negligence, errors or omissions of Consultant. If Consultant fails to promptly correct or replace materials or services, City may make corrections or replace materials or services and charge Consultant for the cost incurred by City.
5. QUALIFICATIONS OF CONSUL TANT - STANDARD OF CARE
Consultant represents and maintains that it has the expertise in the professional calling necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and City expressly relies upon Consultant's representations regarding its skills and knowledge. Consultant shall perform such Services and duties in conformance to and consistent with the professional standards of a specialist in the same discipline in the State of California.
6. COMPENSATION AND PAYMENT
In consideration for Consultant's complete performance of Services, City shall pay Consultant for all materials provided and Services rendered by Consultant in accordance with Exhibit B, entitled "SCHEDULE OF FEES." The maximum compensation of this Agreement is eighty-three thousand three hundred dollars ($83,300), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 2 Rev. 09-28-18
equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Consultant's expense. Consultant shall not be entitled to any payment above the maximum compensation under any circumstance.
7. TERMINATION
A. Termination for Convenience. City shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days' prior written notice to Consultant.
B. Termination for Default. If Consultant fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, City may terminate this Agreement immediately upon written notice to Consultant.
C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Consultant will deliver to City all City information or material that Consultant has in its possession.
8. ASSIGNMENT AND SUBCONTRACTING
City and Consultant bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of City. Consultant shall not hire subconsultants without express written permission from City.
Consultant shall be as fully responsible to City for the acts and omissions of its subconsultants, and of persons either directly or indirectly employed by them, as Consultant is for the acts and omissions of persons directly employed by it.
9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.
10. INDEPENDENT CONSUL TANT
Consultant and all person(s) employed by or contracted with Consultant to furnish labor and/or materials under this Agreement are independent consultants and do not act as agent(s) or employee(s) of City. Consultant has full rights to manage its employees in their performance of Services under this Agreement.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 3 Rev. 09-28-18
11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Consultant and all other written information submitted to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant and shall not, without the prior written consent of City, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services. Nothing furnished to Consultant which is otherwise known to Consultant or becomes generally known to the related industry shall be deemed confidential.
12. OWNERSHIP OF MATERIAL
All material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of City but Consultant may retain and use copies thereof. City shall not be limited in any way or at any time in its use of said material. However, Consultant shall not be responsible for damages resulting from the use of said material for work other than Project, including, but not limited to, the release of this material to third parties.
13. RIGHT OF CITY TO INSPECT RECORDS OF CONSUL TANT
City, through its authorized employees, representatives or agents shall have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Consultant for the purpose of verifying any and all charges made by Consultant in connection with Consultant compensation under this Agreement, including termination of Consultant. Consultant agrees to maintain sufficient books and records in accordance with generally accepted accounting principles to establish the correctness of all charges submitted to City. Any expenses not so recorded shall be disallowed by City. Consultant shall bear the cost of the audit if the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the City.
Consultant shall submit to City any and all reports concerning its performance under this Agreement that may be requested by City in writing. Consultant agrees to assist City in meeting City's reporting requirements to the State and other agencies with respect to Consultant's Services hereunder.
14. HOLD HARMLESS/INDEMNIFICATION
To the extent permitted by law, Consultant agrees to protect, defend, hold harmless and indemnify City, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 4 Rev. 09-28-18
and/or expense or damage, including all costs and attorney's fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, to the extent arising out of, pertaining to, or related to the negligence, recklessness, or willful misconduct of the Consultant, its employees, subconsultants, or agents in the performance, or non-performance, of Services under this Agreement.
15. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Consultant shall provide and maintain in full force and effect, at no cost to City, insurance policies as set forth in Exhibit C.
16. WAIVER
Consultant agrees that waiver by City of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither City's review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.
17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:
City of Santa Clara
Attention: Department of Public Works
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at [email protected] , and
[email protected]
And to Consultant addressed as follows:
W-Trans, Inc.
Attention: Mark Spencer, Senior Principle
7901 Oakport Street, Suite 1500,
Oakland, CA 94621
and by e-mail at [email protected]
The workday the e-mail was sent shall control the date notice was deemed given.
An e~mail transmitted after 1 :00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 5 Rev. 09-28-18
18. COMPLIANCE WITH LAWS
Consultant shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to "The Code of the City of Santa Clara, California" ("SCCC"). In particular. Consultant's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Consultant has read and agrees to comply with City's Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299).
19. CONFLICTS OF INTEREST
Consultant certifies that to the best of its knowledge, no City officer, employee or authorized representative has any financial interest in the business of Consultant and that no person associated with Consultant has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Consultant is familiar with the provisions of California Government Code section 87100 and following, and certifies th.at it does not know of any facts which would violate these code provisions. Consultant will advise City if a conflict arises.
20. FAIR EMPLOYMENT
Consultant shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, reli_gious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.
21. NO USE OF CITY NAME OR EMBLEM
Consultant shall not use City's name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of City.
22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 6 Rev. 09-28-18
23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.
24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.
25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
CONTINUED ON PAGE 8
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 7 Rev. 09-28-18
The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form:
' C- CJ.<.__
Dlgllally slo••d by Calo
Nelliilna
oa10, 2-021.07 .21 11: 16:21
--07'00'
BRIAN DOYLE
City Attorney
"CllY"
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
WHITLOCK & WEINBERGER TRANSPORTATION, INC. (DBA W-TRANS) Dated: ~M_ay_11_,_2_0_2_1 __________ _
By (Signature): - ~-- '---'-~ - ·---------- Name: _M_a_rk_S~p_e_n_c_e~r,_P_E __________ _ Title: _S_e_n_io_r_P_r_in_c~ip_a_l _____ ______ _
Principal Place of 7901 Oakport Street, Suite 1500
Business Address: Oakland, CA 94621 ---------------- -- Em a ii Address: [email protected] Telephone: (510) 444-2600
Fax: ( ) Not available
"CONSUL TANT"
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans Page 8 Rev. 09-28-18
EXHIBIT A
SCOPE OF SERVICES
The Services to be performed for the City by the Consultant under this Agreement are set forth below.
I. BACKGROUND
On February 26, 2020, the City of Santa Clara ("City") Public Works Traffic Division released a Statement of Qualifications (SOQ#DPW-15) to create an oncall list of pre-qualified consultants. The resulting list had six (6) firms and the position on the list is not ranked, Advanced Mobility Group, OKS, Hexagon, lteris, Kimley Horn, and W-Trans. On November 16, 2020, the City Public Works Traffic Division released a Request for Proposal to these six (6) firms to receive proposals for these services.
II. BASIC SCOPE OF SERVICES
A. Review Traffic Control Plans
1. Review to ensure compliance with the California Manual on Uniform Traffic Control Devices (CAMUTCD).
2. Verify accuracy of base map including curb alignments, driveway locations, existing striping, existing street signs.
3. Check for proper cone taper length, cone spacing, advance warning signs, accommodation to impacted bike lane, minimum lane width.
4. Check for proposed work hours and avoid lane closure during rush hours.
5. Check for adequacy of work zone or proposed lane closure for maintaining turning movements and traffic signal operations
6. Check to ensure traffic facilities are protected properly B. Traffic Impact Analysis QA/QC Peer Review
1. Review count data, roadway geometry and assumptions made in the traffic study. Ensure that assumptions are reasonable and consistent with VTA guidelines and City policies.
2. Review the analysis of existing, background and cumulative traffic conditions. Ensure that the numbers "add" up.
3. Review the calculated CEQA impacts (VMT, policy consistency, etc.) and non-CEQA impacts (i.e. Level of Service) in accordance with City of Santa Clara and responsible agency policies.
C. Traffic Related Studies
1. Work with City staff to complete various analyses for resident requests Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit A-Scope of Services Page 1
Rev. 09-28-18
such as intersection control warrants, crosswalk requests, and intersection visibility improvement requests.
2. Conduct field visit, when necessary, to observe up to date field conditions.
3. Use City provided traffic count data and collision reports to determine the appropriate solution to the request.
D. Other Services
1. Review other traffic studies, designs, calculations, or standards prepared by the City or other consultants
2. Support grant application activities (scope of work, exhibits/maps, cost estimates, and other calculations) as requested by the City
3. Complete various traffic engineering studies, conceptual design, or preliminary engineering for capital projects
111. RESPONSIBILITIES OF CITY
CITY will provide the following information and support regarding the project asavailable and applicable:
• Record drawings (as-available)
• CITY's Standard Details, Specifications, and Design Criteria. • City of Santa Clara's Pedestrian Master Plan 2019
• City of Santa Clara's Bicycle Plan Update 2018
• Traffic count data
• Collision record reports
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit A-Scope of Services Page 2
Rev. 09-28-18
EXHIBIT B
SCHEDULE OF FEES
Contractor will bill City on a monthly basis for Services provided by Contractor during the preceding month on an invoice and in a format approved by City and subject to verification and approval by City. City will pay Contractor within thirty (30) days of City's receipt of an approved invoice.
The schedule of rates includes all billing amounts and costs as follows, such as charges for equipment, travel time and costs, per diem expenses, and expendable material costs.
In no event shall the amount billed to City by Consultant for services under this Agreement exceed $83,300, subject to budget appropriations.
Charges for personnel engaged in services shall based on the actual hours directly charged to the project.
Rates by classification are listed below and are effective as of July 1, 2021. No adjustment to the rates will be allowed during the term of this Agreement, July 1, 2021 to July 1, 2023 unless otherwise agreed in writing by City.
Position FY 2021 Billing Rate FY 2022 Billing Rate FY 2023 Billing Rate Through 6/30/21 7/1/21 - 6/30/22
(per hour) (per hour)
Senior Principal $280- $325 $285- $330
Principal $220- $275 $225 - $280
Senior Engineer/Planner $195 - $210 $200-$215
Engineer/Planner $155 - $170 $160 $175
Associate Engineer/Planner $135-$150 $140-$155
Assistant Engineer/Planner $110- $130 $115-$135
Technician/ Administrative $95-$115 $100- $120
Intern $30 - $80 $35- $85
Field Technician $30- $75 $35 - $80
FY 2021-FY 2023 Expense Charges
Item
Mileage
Services and Expenses
Charge
at IRS GSA Rate/mile•
10% surcharge
~· Mileage charge will be based on the IRS Standard Mileage Rate (set at $0.56/mile effective January 1, 2021, with annual changes set by GSA) plus 1 0 percent.
7 /1 /22 - 6/30/23
(per hour)
$290- $335
$230- $285
$205- $220
$165 - $180
$145-$160
$120-$140
$105-$125
$40- $90
$40- $85
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. DBA W-Trans/ Exhibit C-lnsurance Requirements Page 1
Rev. 09-28-18
EXHIBIT C
INSURANCE REQUIREMENTS
Without limiting the Consultant's indemnification of the City, and prior to commencing any of the Services required under this Agreement, the Consultant shall provide and maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the City, at its sole cost and expense, the following insurance policies from insurance companies authorized to do business in the State of California. These policies shall be primary insurance as to the City of Santa Clara so that any other coverage held by the City shall not contribute to any loss under Consultant's insurance. The minimum coverages, provisions and endorsements are as follows:
A. COMMERCIAL GENERAL LIABILITY INSURANCE
1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury
2. Exact structure and layering of the coverage shall be left to the discretion of Consultant; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.
3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Consultant to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a "pay on behalf' basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.
B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. DBA W-Trans/ Exhibit C-lnsurance Requirements Page 2
Rev. 09-28-18
one million dollars ($1,000,000) each accident using, or providing coverage at least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.
In the event that the Work being performed under this Agreement involves transporting of hazardous or regulated substances, hazardous or regulated wastes and/or hazardous or regulated materials, Consultant and/or its subconsultants involved in such activities shall provide coverage with a limit of one million dollars ($1,000,000) per accident covering transportation of such materials by the addition to the Business Auto Coverage Policy of Environmental Impairment Endorsement MCS90 or Insurance Services Office endorsement form CA 99 48, which amends the pollution exclusion in the standard Business Automobile Policy to cover pollutants that are in or upon, being transported or towed by, being loaded onto, or being unloaded from a covered auto.
C. WORKERS' COMPENSATION
1. Workers' Compensation Insurance Policy as required by statute and employer's liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accident/Bodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.
2. The indemnification and hold harmless obligations of Consultant included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Consultant or any subconsultant under any Workers' Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).
3. This policy must include a Waiver of Subrogation in favor of the City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents.
D. PROFESSIONAL LIABILITY
Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Consultant. Covered services as designated in the policy must specifically include work performed under this agreement. Coverage shall be in an amount of not less than one million dollars ($1,000,000) per claim or two million dollars ($2,000,000) aggregate. Any coverage containing a deductible or self-retention must first be approved in writing by the City Attorney's Office.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit C-lnsurance Requirements Page 3
Rev. 09-28-18
E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.
1. Additional Insureds. City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents are hereby added as additional insureds in respect to liability arising out of Consultant's work for City, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 1 O 01, or its equivalent.
2. Primary and non-contributing. Each insurance policy provided by Consultant shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the indemnities may possess, including any self-insurance or self-insured retention they may have. Any other insurance indemnities may possess shall be considered excess insurance only and shall not be called upon to contribute with Consultant's insurance.
3. Cancellation.
4. a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided due to non-payment of premiums shall be effective until written notice has been given to City at least ten (10) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal.
b. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided for any cause save and except non-payment of premiums shall be effective until written notice has been given to City at least thirty (30) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least thirty (30) days prior to the effective date of nonrenewal.
Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit C-lnsurance Requirements Page 4
Rev. 09-28-18
F. ADDITIONAL INSURANCE RELATED PROVISIONS
Consultant and City agree as follows:
1. Consultant agrees to ensure that subconsultants, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Consultant, provide the same minimum insurance coverage required of Consultant, except as with respect to limits. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Consultant agrees that upon request by City, all agreements with, and insurance compliance documents provided by, such subconsultants and others engaged in the project will be submitted to City for review.
2. Consultant agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Consultant for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto.
3. The City reserves the right to withhold payments from the Consultant in the event of material noncompliance with the insurance requirements set forth in this Agreement.
G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Consultant, and each and every subconsultant (of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements and deductibles indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to City and as described in this Agreement. Consultant shall file with the City all certificates and endorsements for the required insurance policies for City's approval as to adequacy of the insurance protection.
H. EVIDENCE OF COMPLIANCE
Consultant or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to City, or its representative as set forth below, at or prior to execution of this Agreement.
Upon City's request, Consultant shall submit to City copies of the actual insurance policies or renewals or replacements. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit C-lnsurance Requirements Page 5
Rev. 09-28-18
and other items required to be delivered to City pursuant to this Agreement shall be mailed to:
EBIX Inc.
City of Santa Clara Public Works Department
P.O. Box 100085- S2 or 1 Ebix Way
Duluth, GA 30096 John's Creek, GA 30097
Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]
I. QUALIFYING INSURERS
All of the insurance companies providing insurance for Consultant shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the City or its insurance compliance representatives.
Design Professional Agreement with Whitlock & Weinberger Transportation, Inc. OBA W-Trans/ Exhibit C-lnsurance Requirements Page 6
Rev. 09-28-18
Amendment No. 1 to Agreement/DKS Associates Page 1
Rev. 10/25/19
Ebix Insurance No. S200004256
AMENDMENT NO. 1
TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
DKS ASSOCIATES
PREAMBLE
This agreement (“Amendment No. 1”) is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and DKS Associates, a California corporation, (Contractor). City and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”
RECITALS
A. The Parties previously entered into an agreement entitled “AGREEMENT FOR
DESIGN PROFESSIONAL SERVICES BETWEEN THE CITY OF SANTA
CLARA, CALIFORNIA AND DKS ASSOCIATES”, dated July, 27, 2021 (Agreement); and
B. The Parties entered into the Agreement for the purpose of having Contractor provide traffic engineering services, and the Parties now wish to amend the Agreement to extend the termination date and increase the maximum compensation.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Agreement, entitled “TERM OF AGREEMENT” is amended to read as follows:
“Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2024.”
2. Section 6 of the Agreement, entitled “COMPENSATION AND PAYMENT” is amended to read as follows:
“In consideration for Contractor’s complete performance of Services, City shall pay Contractor for all materials provided and Services rendered by Contractor in accordance with Exhibit B, entitled “SCHEDULE OF FEES.” The maximum compensation of this Agreement is one hundred fifty thousand dollars Amendment No. 1 to Agreement/DKS Associates Page 2
Rev. 10/25/2019
($150,000), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor’s expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.”
3. Except as set forth herein, all other terms and conditions of the Agreement shall remain in full force and effect. In case of a conflict in the terms of the Agreement and this Amendment No. 1, the provisions of this Amendment No. 1 shall control.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 1 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated:
Office of the City Attorney
City of Santa Clara
Rajeev Batra
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“CITY”
DKS ASSOCIATES
a California corporation
Dated:
By (Signature):
Name: Terry Klim
Title: Principal
Principal Place of
Business Address:
720 SW Washington, #500, Portland, OR
97205
Email Address: [email protected]
Telephone: (510) 763-2061
Fax: (510) 268-1739
“CONTRACTOR”
S:\Attorney\AGREEMENTS\Amendments\Amendment No. 1 - Form.doc Amendment No. 1 to Agreement/Kimley-Horn and Associates Page 1 Rev. 10/25/19
Ebix Insurance No. S200004631
AMENDMENT NO. 1
TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
KIMLEY-HORN AND ASSOCIATES, INC
PREAMBLE
This agreement (“Amendment No. 1”) is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Kimley-Horn and Associates, Inc, a North Carolina corporation, (Contractor). City and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”
RECITALS
A. The Parties previously entered into an agreement entitled “AGREEMENT FOR
DESIGN PROFESSIONAL SERVICES BETWEEN THE CITY OF SANTA
CLARA, CALIFORNIA AND KIMLEY-HORN AND ASSOCIATES, INC”, dated July, 27, 2021 (Agreement); and
B. The Parties entered into the Agreement for the purpose of having Contractor provide traffic engineering services, and the Parties now wish to amend the Agreement to extend the termination date and increase the maximum compensation.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Agreement, entitled “TERM OF AGREEMENT” is amended to read as follows:
“Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2024.”
2. Section 6 of the Agreement, entitled “COMPENSATION AND PAYMENT” is amended to read as follows:
“In consideration for Contractor’s complete performance of Services, City shall pay Contractor for all materials provided and Services rendered by Contractor in accordance with Exhibit B, entitled “SCHEDULE OF FEES.” The maximum
compensation of this Agreement is one hundred fifty thousand dollars ($150,000), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor’s expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.”
3. Except as set forth herein, all other terms and conditions of the Agreement shall remain in full force and effect. In case of a conflict in the terms of the Agreement and this Amendment No. 1, the provisions of this Amendment No. 1 shall control.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 1 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated:
Office of the City Attorney
City of Santa Clara
Rajeev Batra
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“CITY”
KIMLEY-HORN AND ASSOCIATES, INC
a North Carolina corporation
Dated:
By (Signature):
Name: Brian Sowers
Title: Senior Vice President
Principal Place of
Business Address:
4637 Chabot Drive, Suite 300
Pleasanton, CA 94588
Email Address: [email protected]
Telephone: (925) 398-4840
Fax: None
“CONTRACTOR”
S:\Attorney\AGREEMENTS\Amendments\Amendment No. 1 - Form.doc Amendment No. 1 to Agreement/Kimley-Horn and Associates Rev. 10/25/19
Amendment No. 1 to Agreement/Whitlock & Weinberger Transportation, Inc. DBA W-Trans Page 1 Rev. 10/25/19
Ebix Insurance No. S200004220
AMENDMENT NO. 1
TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
WHITLOCK & WEINBERGER TRANSPORTATION, INC., DBA W-TRANS
PREAMBLE
This agreement (“Amendment No. 1”) is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Whitlock & Weinberger Transportation, Inc., a California corporation, doing business as W-Trans, (Contractor). City and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”
RECITALS
A. The Parties previously entered into an agreement entitled “AGREEMENT FOR
DESIGN PROFESSIONAL SERVICES BETWEEN THE CITY OF SANTA
CLARA, CALIFORNIA AND WHITELOCK & WEINBERGER
TRANSPORTATION, INC., DBA W-TRANS”, dated July, 21, 2021 (Agreement); and
B. The Parties entered into the Agreement for the purpose of having Contractor provide traffic engineering services, and the Parties now wish to amend the Agreement to extend the termination date and increase the maximum compensation.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Agreement, entitled “TERM OF AGREEMENT” is amended to read as follows:
“Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2021 and terminate on July 1, 2024.”
2. Section 6 of the Agreement, entitled “COMPENSATION AND PAYMENT” is amended to read as follows:
“In consideration for Contractor’s complete performance of Services, City shall pay Contractor for all materials provided and Services rendered by Contractor in
accordance with Exhibit B, entitled “SCHEDULE OF FEES.” The maximum compensation of this Agreement is one hundred fifty thousand dollars ($150,000), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor’s expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.”
3. Except as set forth herein, all other terms and conditions of the Agreement shall remain in full force and effect. In case of a conflict in the terms of the Agreement and this Amendment No. 1, the provisions of this Amendment No. 1 shall control.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 1 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated:
Office of the City Attorney
City of Santa Clara
Rajeev Batra
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“CITY”
WHITLOCK & WEINBERGER TRANSPORTATION, INC. DBA W-TRANS
a California corporation
Dated:
By (Signature):
Name: Mark Spencer, PE
Title: Senior Principal
Principal Place of
Business Address:
414 13th Street, 5th Floor
Oakland, CA 94612
Email Address: [email protected]
Telephone: (510) 444-2600
Fax: ( ) Not available
“CONTRACTOR”
S:\Attorney\AGREEMENTS\Amendments\Amendment No. 1 - Form.doc Amendment No. 1 to Agreement/Whitlock & Weinberger Transportation, Inc. DBA W-Trans Rev. 10/25/19
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1364 Agenda Date: 12/6/2022
REPORT TO HOUSING AUTHORITY
SUBJECT
Action on Amendment No. 5 to the Exclusive Negotiation Agreement and Amendment No. 3 for the Amended and Restated License Agreement with Habitat for Humanity East Bay / Silicon Valley for 3575 De La Cruz Boulevard
COUNCIL PILLAR
Promote and Enhance Economic, Housing and Transportation Development
BACKGROUND
The City selected Habitat for Humanity East Bay / Silicon Valley (Developer) in 2018 through a competitive process as the developer for a City-owned affordable housing site at 3575 De La Cruz Boulevard. On April 9, 2019, the City Council approved an Exclusive Negotiation Agreement (ENA) with the Developer for the site. (Attachment 1)
The proposed project is the construction of 15 new units (previously 13 units) of affordable homeownership housing at the site, available to a diverse range of mixed income families earning between 50 percent (previously 60 percent) and 120 percent of the Area Median Income (AMI). The units would be developed as a mix of townhomes and flats, using a cohesive design that maximizes cost efficiencies while providing homes that are attractive, energy efficient, and durable. The conceptual site plan is intended to maximize the number of affordable homes while strategically addressing various site constraints, including positioning the new homes to minimally impact the adjacent property owners and provide a transition to the industrial park to the south.
The ENA provided an initial negotiating period of 18 months, commencing on the date the Agreement was fully executed, which could be extended for two additional periods of six months each by the City Manager upon presentation of a written request from the Developer together with a schedule of tasks to be accomplished during the additional period. Both six-month extensions have been authorized by the City Manager with the first authorized. As allowed under the ENA, the City Manager previously granted two six-month extensions for the ENA (Amendment No. 1 and Amendment No. 2) on December 14, 2020 and the second on July 12, 2021, respectively. (Attachments 2 and 3) Since that time, two additional extensions were signed extending the ENA until December 30, 2022. (Attachments 4 and 5)
Site Description
The Property is currently a vacant 0.7-acre site. The site was previously developed with a City Fire Station, which was demolished in 2010. An 80-foot PG&E easement containing transmission lines supported on top of 100-foot tall PG&E lattice towers is located along the Property’s eastern edge.
Surrounding land uses include light industrial buildings to the south, single-family residences to the east and north, and Montague Park to the west on the opposite side of De La Cruz Boulevard.
City of Santa Clara Page 1 of 3 Printed on 12/2/2022
powered by Legistar™
22-1364 Agenda Date: 12/6/2022
Golden State Baptist College is located to the southwest of the project site, also fronting on De La Cruz Boulevard adjacent to Montague Park.
Request for Proposals (RFP)
Prior to the issuance of an RFP, the City conducted preliminary outreach for the future development of the property as an affordable housing site. Input from the outreach was incorporated into the RFP.
The City then issued an RFP on June 13, 2018 and selected the Developer in October 2018 as the result of the RFP process. The interview panel made a unanimous decision to select Habitat for Humanity East Bay / Silicon Valley determining that their proposal fully addressed the RFP goals.
DISCUSSION
Habitat for Humanity is requesting a Fifth Amendment to their ENA with the City to grant an extension for six months. This will allow the Developer additional time to prepare a Disposition and Development Agreement (DDA) for Council consideration in 2023. The request also includes an update to the City’s license agreement with Habitat for Humanity. The license agreement provides temporary right of access and sets terms around access to the property for activities related to due diligence such as conducting property surveys, geotechnical, environmental and utility studies. The license agreement must also be amended to allow access through the proposed extension to the ENA period.
In recent months, the project has made significant progress, including a project redesign to increase the number of ownership units from 13 to 15, and to add very low income units into the project, while also working towards a commitment for County Measure A funding, advancing the environmental review process, and preparing for public hearings for entitlements in early 2023. Staff is anticipating Planning Commission review in early 2023. Full entitlements and a DDA are tentatively scheduled for Council consideration in spring 2023.
Implementation of the Developer’s proposal for 3575 De La Cruz Boulevard would achieve the City’s objective for the development of a mix of affordable housing project types throughout the City, providing a relatively unique-small scale, family-oriented development. As proposed, the project achieves many of the goals and objectives of the City’s RFP for the property, including alignment with community interest in terms of the development program and City standards for financing and affordability. The Developer was also selected based on their well-established history in the production of affordable housing.
While the Developer has experienced some setbacks, they have also made steady progress toward the development of the site. The following represents a synopsis of the activities performed by the Developer in recent months:
May - October 2022:
· Revised proforma to accommodate Measure A funding guidelines resulting in more units and deeper affordability than previously planned for · Refined plans and submitted initial plan for review
· Responded to comments provided by the City
· Hired CEQA consultant and commenced work on the CEQA statutory exemption City of Santa Clara Page 2 of 3 Printed on 12/2/2022
powered by Legistar™
22-1364 Agenda Date: 12/6/2022
Conclusion
Staff is recommending the City Council approve Amendment No. 5 to the ENA and Amendment No. 3 to the Amended and Restated license agreement with Habitat for Humanity East Bay / Silicon Valley to allow more time to complete due diligence, the Planning Commission public hearing, and to bring forward a Disposition and Development Agreement (DDA) to Council for consideration within the next six months. (Attachments 6 and 7)
ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(5) in that it is a governmental organizational or administrative activity that will not result in direct or indirect changes in the environment.
FISCAL IMPACT
There is no cost to the City for this agreement other than administrative time and expense. As noted above, implementation of the proposed project would generate ongoing revenue to the City’s Affordable Housing Fund through repayments of loans.
COORDINATION
This report has been coordinated with the Department of Finance and the City Attorney’s Office.
PUBLIC CONTACT
The project will continue to engage the public during the ENA term. Staff will continue to work closely with community members and other interested stakeholders throughout the process.
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]>.
RECOMMENDATION
Approve and authorize the City Manager to execute Amendment No.5 to the Exclusive Negotiation Agreement (ENA) and the Amendment No. 3 to the Amended and Restated license agreement with Habitat for Humanity East Bay / Silicon Valley for the development 3575 De La Cruz Boulevard.
Reviewed by: Andrew Crabtree, Director of Community Development Approved by: Rajeev Batra, City Manager
ATTACHMENTS
1. Habitat-DeLaCruz Exclusive Negotiation Agreement (ENA)
2. Habitat 1st Amendment ENA
3. Habitat 2nd Amendment ENA
4. Habitat 3rd Amendment ENA
5. Habitat 4th Amendment ENA
6. DRAFT Habitat 5th Amendment ENA
7. DRAFT Amendment No. 3 Amended and Restated License Agreement City of Santa Clara Page 3 of 3 Printed on 12/2/2022
powered by Legistar™
EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT
(APN 101-15-049)
This Exclusive Negotiating Rights Agreement (this "Agreement") is entered into as of this M~\I qt]::. , 2019 by and between the City of Santa Clara (the "City") and Habitat for Humanity East Bay/Silicon Valley (the "Developer"). City and Developer may be referred to individually as a "Patiy" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cmz Boulevard (APN 101-15-049), as shown on the map attached to this Agreement as Exhibit A and incorporated herein by this reference (the "Property").
B. After redevelopment agencies (RDA) were dissolved on Febmary 1, 2012, the City, as Housing Successor to the dissolved RDA, was designated to assume all housing assets (including land) of the fotmer redevelopment agency and these assets were placed into a Housing Successor Fund. The Housing Successor must initiate development activities on any land that it obtained from the former RDA consistent with the intent to provide housing that is 100% affordable to persons and families of low and moderate income.
C. On June 13, 2018, a Request for Proposals (RFP) was issued for the development of Property. On January 15, 2019, City Council noted and filed City staffs recommendation of Developer for development of the site and directed staff to draft an Exclusive Negotiations Agreement for Council consideration.
D. The Developer has proposed to develop the Property with 13 units of affordable ownership housing, including mixed-income townhomes and flats (the "Project"). The entire project is proposed to be affordable to households with income between 60% and 120% of Area Median Income (AMI).
E. The City is interested in exploring the feasibility of the Project and has selected the Developer as a potential developer of the Project. The City would convey fee title ownership of the Property through a grant deed and is considering offering a maximum subsidy of $100,000 per affordable housing unit to facilitate Project financing.
F. The Property is currently zoned as Public/Quasi-Public (B). The land is designated as Very Low Density Residential on the General Plan Land Use diagram. Redevelopment of the Property for new housing will subsequently require City approval, including City Council, Planning Commission approvals of a General Plan Amendment, Rezoning, Architectural Review and California Environmental Quality Act (CEQA) and potentially National Environmental Policy Act (NEPA) review.
G. The development of this Project will allow the City to meet its obligations as Housing Successor to provide low- and moderate-income housing on the Property and meet the -1-
deadline required by the State of California to commence development of the site within five years after the Department of Finance confirmed the Property as a housing asset.
H. The Parties intend to enter into this Agreement to establish procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the "DDA") pursuant to which the Developer will conduct specified development activities related to the Property. The Pmties further intend that this Agreement in itself will not grant the Developer the right to develop the Project, nor will it obligate the Developer to any activities or costs to develop the Project, except for the preliminary analysis and negotiations contemplated by this Agreement.
AGREEMENT
The Parties mutually agree as follows:
EXCLUSIVE NEGOTIATIONS RIGHT
1. Good Faith Negotiations. The City and the Developer shall negotiate diligently and in good faith, during the Negotiating Period described in Section 2, the terms of a DDA for the development of the Project on the Prope1ty. During the Negotiating Period, the Pmties shall use good faith eff01ts to accomplish the respective tasks outlined herein in Exhibit B to facilitate the negotiation of a mutually satisfactory DDA.
Among the issues to be addressed in the negotiations are the physical and land title conditions of the Property and remediation of any adverse conditions, the development schedule for the Project, and financing of the Project.
2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be eighteen (18) months, commencing on the date this Agreement is fully executed, which may be extended for a period of an additional two periods of six ( 6) months each upon presentation of a written request from the Developer together with a schedule of tasks to be accomplished during the additional period. Granting of such extension(s) shall be at the discretion of the City Manager and shall only be effective upon the execution of an amendment to the Agreement.
If a DDA has not been executed by the City and the Developer by the expiration of the Negotiating Period, then this Agreement shall terminate and neither Party shall have any fu1ther rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a DDA is executed by the City and the Developer then, upon such execution, this Agreement shall te1minate, and all rights and obligations of the Parties shall be as set forth in the executed DDA.
3. Exclusive Negotiations. During the Negotiating Period, the City shall not negotiate with any individual, organization, or entity, other than the Developer, regarding the sale or development of the Prope1ty or any po1tion thereof or solicit or entertain bids or proposals to do so.
4. City Consultant Costs Deposit. The Developer acknowledges that the City shall expend resources in the negotiation of the DDA and perf01mance of the tasks provided in -2-
Exhibit B. In order for this Agreement to remain in effect, the Developer and the City shall agree on an amount that the Developer shall submit to the City as a good faith and initial third-pa1iy consultant costs deposit, the sum of TWENTY-FIVE THOUSAND Dollars ($25,000) (the "Deposit") to be paid within thirty (30) days following execution of this Agreement by the City and the Developer. The Deposit shall be provided in the form of a check made to the order of the City and be placed in a separate City deposit account. Any interest earned on the Deposit and any subsequent deposits shall be added to the total Deposit amount and may be used in accordance with this Agreement.
The City shall have no obligation to begin the negotiation of the DDA or to retain thirdpmiy consultants until the Developer delivers the Deposit to the City. For the period of six (6) months following the date of the Agreement ("Due Diligence Period"), the Deposit shall be fully refundable, except for any costs incurred by the City as described below.
The City may use the Deposit to pay for the City's third-pmiy consultant costs and expenses in negotiating and preparing the DDA ( collectively, the "Transaction Documents"). Such costs may include but are not limited to reasonable fees and services of third-party consultants and attorneys, selected by the City at its sole discretion, relating to the Project and the preparation of the Transaction Documents ("Consultant Costs"). Prior to incun-ing any Consultant Costs, the City shall submit an outline budget for use of the Deposit describing the general scope of work, cost and timing of expenditure.
Following the Due Diligence Period, the Developer shall be responsible for all of the City's Consultant Costs subject to the restrictions contained in this Section 4. Prior to the City incurring Consultant Costs in excess of the Deposit, the City shall provide the Developer with a schedule of the Consultant Costs incurred to date and an estimate of the additional Consultant Costs anticipated to be incuned. The Developer shall reasonably approve or disapprove the Consultant Costs within seven (7) days following the City's submittal of the anticipated Consultant Costs. If Developer disapproves the City's Consultant Costs, the City and Developer will meet and in good faith evaluate the estimate and attempt to reach a compromised budget acceptable to both parties. The Developer shall deposit with the City the amount of the additional Consultant Costs as approved by the Developer within fou1ieen (14) days of such approval. The additional amount shall be added to the Deposit. The City shall be reimbursed for all additional Consultant Costs approved by the Developer and incmred by the City prior to the date of the termination of this Agreement.
To the extent this Agreement is terminated prior to or as of the end of the Negotiating Period and the City has incurred Consultant Costs that are less than the Deposit, and Developer has negotiated in good faith and is not in breach of this Agreement, the City shall return the unexpended balance of the Deposit to the Developer along with an accounting of the Consultant Costs incurred by the City.
If this Agreement is te1minated by the City due to a failure by the Developer to negotiate in good faith under this Agreement the Deposit and any interest earned thereon shall be retained by the City, as more fully provided in Section 10. Conversely, if this Agreement is terminated by the Developer due solely to a City default, the Deposit and any interest earned thereon shall be returned to the Developer.
-3-
5. Identification of Developer Representative. The Developer's representative to negotiate the DDA with the City is: Rob Simonds.
GENERAL PROVISIONS
6. Limitation on Effect of Agreement. This Agreement shall not obligate either the City or the Developer to enter into a DDA or to enter into any patticular DDA. By execution of this Agreement, the City is not committing itself to or agreeing to unde1take acquisition, disposition, or exercise of control over any property. City shall have final discretion and approval regarding the execution of a DDA and all proceedings and decisions in connection therewith. Any DDA resulting from negotiations pursuant to this Agreement shall become effective only if and after such DDA has been considered and approved by the City.
7. Notices. F01mal notices, demands and communications between the City and the Developer shall be sufficiently given if, and shall not be deemed given unless, dispatched by certified mail, postage prepaid, return receipt requested, or sent by express delivery or overnight courier service, to the office of the Patties shown as follows, or such other address as the Parties may designate in writing from time to time:
City:
Developer:
City of Santa Clara
1500 Warbmton A venue
Santa Clara, CA 95050
Attention: City Manager
Habitat for Humanity East Bay/Silicon Valley
2619 Broadway
Oakland, CA 94612
Attention: Janice Jensen
Such written notices, demands and communications shall be effective on the date shown on the delivery receipt as the date delivered.
8. Costs and Expenses. Except for the Developer's obligation to fund certain City Consultant Costs under Section 4, above, each Patty shall be responsible for its owns costs and expenses in connection with any activities and negotiations undertaken in connection with this Agreement, and the performance of each Patty's obligations under this Agreement.
9. No Commissions. The City shall not be liable for any real estate commissions or brokerage fees that may arise from this Agreement or any DDA that may result from this Agreement. The City represents that it has engaged no broker, agent or finder in connection with this transaction, and the Developer shall defend and hold the City hatmless from any claims by any broker, agent or finder retained by the Developer.
10. Defaults and Remedies.
(a) Default. Failure by either Patty to negotiate in good faith as provided in this Agreement shall constitute default hereunder. The non-defaulting Party shall give written notice of a default to the defaulting Patty, specifying the nature of the default and the required -4-
action to cure the default. If a default remains uncured thirty (30) days after receipt by the defaulting patty of such notice, the non-defaulting Patty may exercise the remedies set forth in subsection (b ).
(b) Remedies. In the event of an uncured default by the City, the Developer's sole remedy shall be to te1minate this Agreement, upon which te1mination the Developer shall be entitled to the return of the uncommitted portion of the Deposit, as set forth in Section 4, and any interest earned thereon. Following such termination and the return of the appropriate amount of the Deposit and any interest earned thereon, neither party shall have any further right, remedy or obligation under this Agreement; provided, however, that the Developer's indemnification obligation pursuant to Section 11 shall survive such termination.
In the event of an uncured default by the Developer, the City's sole remedy shall be to te1minate this Agreement and to retain any unexpended funds remaining in the Deposit and any interest earned thereon. Following such termination, neither Party shall have any right, remedy or obligation under this Agreement; provided; however, that the Developer's indemnification obligation pursuant to Section 11 shall survive such te1mination.
Except as expressly provided above, neither party shall have any liability to the other for damages or otherwise for any default, nor shall either party have any other claims with respect to performance under this Agreement. Each party specifically waives and releases any such rights or claims they may otherwise have at law or in equity.
11. Developer's Obligation to Indemnify City. Developer shall defend, indemnify, and hold harmless the City from and against all suits and causes of action, claims, losses, demands and expenses, including, but not limited to, reasonable attorneys' fees and costs of litigation, damage or liability of any nature whatsoever, arising directly or indirectly, in whole or in patt, are caused by, arise in connection with, result from, relate to, or are alleged to be caused by, arise in connection with perfo1mance of this Agreement on the patt of the Developer or any contractor or subcontractor of the Developer. The Developer shall pay immediately upon the City's demand any amounts owing under this indemnity. The duty of the Developer to indemnify includes the duty to defend the City, at the City's choosing, to pay the City's costs of its defense in any court action, administrative action, or other proceeding brought by any third Patty arising in any manner by reason of or incident to the performance of this Agreement on the patt of the Developer or any contractor or subcontractor of the Developer. The City shall have the right to approve any attorneys retained by the Developer to defend the City pursuant to this Section 11 and shall have the right to approve any settlement or compromise. The Developer's duty to indemnify the City shall survive the termination of this Agreement. Notwithstanding the above, the Developer shall have no obligation to defend, indemnify or hold hatmless the City, for any and all suits and causes of action, claims, losses, demands and expenses caused by, arising from, or related in any pmt to, any gross negligence, fraud or misconduct on the patt of the City or its employees, agents, assigns, officers, or officials.
12. Compliance with Laws. Developer shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to "The Code of the City of Santa Clara, California" ("SCCC"). In particular, Developer's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC -5-
Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Ce11ificate (SCCC section
3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally, Developer has read and agrees to comply with City's Ethical Standards (http:llsantaclaraca.govlhomelshowdocument?id=58299).
13. Nonliability of Officials, Officers, Members, and Employees. No member, official, officer, or employee of the City shall be personally liable to the Developer, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Developer or to its successor, or on any obligations under the terms of this Agreement.
No member, officer, or employee of the Developer shall be personally liable to the City, or any successor in interest, in the event of any default or breach by the Developer or for any amount which may become due to the City or to its successor, or on any obligations under the te1ms of this Agreement.
14. Assignment. The Developer shall not assign its rights or responsibilities under this Agreement, in whole or in part, except with the written consent of the City. Any attempted assignment without such prior written consent shall be invalid and void.
15. Governing Law. This Agreement shall be governed by and constrned in accordance with the laws of the State of California.
16. Entire Agreement. This Agreement, including the Exhibits, contains all the agreements, representations and understandings of the Pmties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written.
17. Counterparts. This Agreement may be executed in counterpmis, each of which shall be deemed an original but all of which together shall constitute one and the same agreement.
II
II
II
-6-
The Patties acknowledge and accept the te1ms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.
APPROVED AS TO FORM:
City Attorney
"CITY"
Dated: ~ - \1 - \ 9
~ ~fcTL ~ ANTANA
City Manager
1500 Warbmton A venue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY
Developer
:~: =J=~:;,~: ~J=:n=~=e=:==-:' :
9 ::::::: __________ _
---------------------
Title: President & CEO ---------------------
Local Address: _2_6_19_B_ro_a_d_w_a...,_y ______________ _ Oakland, CA 94612
Email Address: [email protected]
Telephone: 510-251-6304
Fax: 61 ° - 2 5 I - G, 3 o ~
"CONTRACTOR"
-7-
"'
u
u
~
"' ,(
~
u
~
®
EXHIBIT A
PROPERTY MAP
(APN: 101-15-049)
Exhibit A
-1-
EXHIBITB
NEGOTIATION PERIOD & TENTATIVE WORK PLAN
NEGOTIATION PERIOD
1. Overview. To facilitate negotiation of the DDA, the Patties shall use reasonable good faith efforts to accomplish the tasks set forth in Exhibit B in a timeframe that will support negotiation and execution of a mutually acceptable DDA prior to the expiration of the Negotiating Period. Within the first thiity (30) days of this Agreement, the Patties will agree upon a work plan for tasks to be accomplished.
2. Site Plan. The Developer shall prepare and submit to the City a proposed site plan identifying the size and shape of the parcels which comprise the Prope1ty (the "Development Parcels") and the location of the Project improvements to be constrncted on each of the Development Parcels.
3. Developer Cooperation and Coordination with Adjacent Parcels. Developer acknowledges the adjacent parcels and shall plan the site to be sensitive to these neighborhoods.
4. Financing and Costs of Development. The Developer shall provide the City with a detailed financial pro forma for the Project containing, among other matters, a detailed development budget setting forth the costs of the tasks to be unde1taken by the Developer. The financial proforma will be used to evidence the financial feasibility of the Project and to assist in the negotiation of te1ms regarding payment of costs of land and development.
5. Documents. Prior to execution of a DDA, the Developer shall provide the City with its organizational documents as well as organization chart outlining key personnel's roles and responsibilities. Developer shall also submit to the City for its approval, copies of all operating agreements, joint venture agreements or other agreements between the members of the development entity, and such financial statements or tax returns reasonably required by the City to determine the Developer's financial capability, excluding confidential or proprietary inf01mation.
6. Environmental Review. The City shall prepare or cause to be prepared any environmental documentation required by the California Environmental Quality Act ("CEOA") for consideration of approval of the DDA; if any, provided, that nothing in this Agreement shall be constrned to compel the City to approve or make any patticular findings with respect to such environmental documentation. The Developer shall provide such information as may be required to enable the City to prepare or cause preparation and consideration of any CEQA-required document, and shall otherwise generally cooperate with the City to complete this task. The Developer shall be responsible for all costs associated with the preparation of the required CEQA documentation.
7. Due Diligence. During the Negotiating Period, the Developer shall conduct the following due diligence activities:
Exhibit B
-1-
(a) Property Adequacy Determination. The Developer shall determine whether the Property is suitable for development of the Project, taking into account the geotechnical and soils conditions, the presence or absence of toxic or other hazardous materials, the zoning of the Property, the massing of the proposed Project improvements and the parking requirements imposed on projects of this type and the other environmental and regulatmy factors that the Developer deems relevant. If, in the Developer's judgment based on such investigations and analyses, the Prope1iy is not suitable for development, the Developer may notify the City in writing prior to the expiration of the Negotiating Period of its determination. Upon such timely notification by the Developer, the remaining balance of the Deposit shall be immediately refunded to the Developer and this Agreement shall be terminated without fu1iher action of either Party, and thereafter neither Pmiy shall have any further duties, obligations, rights, or liabilities under this Agreement; except as set fmih in Section 4 and Section 11 (b) Objections to Title. Promptly following the execution of this Agreement, the Developer shall cause Old Republic Title Company at 675 N. 1st St., #900, San Jose, California, to issue a Preliminary Title Report (the "Repmi") on the Prope1iy to the Developer and the City.
If the Developer objects to any exception appearing on the Report or should any title exception arise after the date of the Repmi, the Developer may object to such exception, provided such objection is made to the City in writing on or before 5 :00 P .M. on the thirtieth (30th) day following the date the Developer and the City receive the Report. If the Developer objects to any exception to title, the City, within fifteen (15) days ofreceipt of Developer's objection shall notify Developer in writing whether City elects to (i) cause the exception to be removed off record, (ii) obtain a commitment from for an appropriate endorsement to the policy of title insurance to be issued to the Developer, insuring against the objectionable exception, or (iii) terminate this Agreement, unless the Developer elects to take title subject to such exception. If either Pmiy elects to terminate this Agreement pursuant to this subsection, the remaining balance or the Deposit shall be immediately refunded to the Developer and neither Party shall thereafter have any obligations to or rights against the other hereunder, except as set fo1ih in Section 4 and Section 11 If the Developer fails to provide any notification to the City regarding this matter prior to expiration of the time period set forth herein, the condition set fo1ih in this subsection shall be deemed satisfied and this Agreement shall continue in effect. Notwithstanding the foregoing, City shall use good faith best efforts to keep the Property free and clear of any new liens or encumbrances during the Negotiating Period.
8. Site Access. No later than ten (10) days following execution of this Agreement, Developer and the City will enter into a separate agreement to provide Developer and its consultants with rights to enter, examine and conduct tests on the Property.
9. Repmis. The Developer shall provide the City with copies of all repmis, studies, analyses, c01Tespondence and similar documents, but excluding confidential or proprietary information, prepared or commissioned by the Developer with respect to this Agreement and the Project, promptly upon their completion. The City shall provide the Developer with copies of all reports, studies, analyses, c01Tespondence and similar documents (collectively, "Documents") prepared or commissioned by the City with respect to this Agreement and the Project, promptly following execution of this Agreement with respect to documents then in its possession or under its reasonable control, and promptly upon their completion with respect to any subsequently prepared documents.
Exhibit B
-2-
While desiring to preserve its rights with respect to treatment of certain information on a confidential or proprietary basis, the Developer acknowledges that the City will need sufficient, detailed information about the proposed Project (including, without limitation, the financial information described in Section 10) to make informed decisions about the content and approval of the DDA. The City will work with the Developer to maintain the confidentiality of proprietary information subject to the requirements imposed on the City by the Public Records Act (Government Code Sections 6253, et seq.). The Developer acknowledges that the City may, subject to the limitations set forth in the preceding sentence, share information provided by the Developer of a financial and potential proprietary nature with third patty consultants and City Council members as pmt of the negotiation and decision making process. If this Agreement is te1minated without the execution of a DDA, the City shall return to the Developer any info1mation submitted by the Developer under this Agreement.
10. Schedule of Performance. During the Negotiating Period, the Developer and City will complete initial work and studies as described in Exhibit B. Following the Negotiating Period, the Developer shall provide the City with a detailed schedule of perfo1mance for the Project which shall include, but not be limited to: a plan setting f01th the proposed timeline for the preparation of development concepts, community outreach, and planning and environmental review/approval.
11. Progress Reports. Each Party on a monthly basis shall make oral or written progress reports advising the other party on studies being made and matters being evaluated by the reporting Party with respect to this Agreement and the Project.
Exhibit B
-3-
TENTATIVE WORK PLAN
CITY
• Begin environmental documentation required by the California Environmental Quality Act ("CEOA");
• Facilitate meeting to review submittal for Planned Development Zoning, Planning and Development Permits and Tentative Map Application and circulation of Draft CEQA Analysis;
• Provide confirmation of all applicable City fees and waivers, including parks fees; • Arrange meetings for the negotiation of the DDA;
• Schedule Planning Commission Hearing;
• Schedule City Council Hearing;
• Provide City financing documentation for public finance applications; and • Other tasks as appropriate to meet project goals.
DEVELOPER (During Negotiation Period of ENA)
•
•
•
•
•
•
•
Prepare a Scope of Development and Proposed Site Plan describing location and land uses of the proposed Project;
Prepare detailed Schedule of Performance for the Project and key partners; Submit a detailed pro fmma and begin negotiating a Te1m Sheet to discuss and evaluate the financial and operational components, including any requirements pertaining to the applicability of any prevailing wage requirements; Provide the City with organizational documents as well as an organization chaii outlining key personnel's roles and responsibilities;
Identify key stakeholders; Conduct and document Project Community Meetings for public input on site design and operations;
Preliminary Analysis of toxic and hazardous waste conditions throughout the Property;
Preliminary Analysis of geotechnical conditions of site surface and subsurface; DEVELOPER (Post execution ofDDA)
• Assessment of traffic and parking issues/constraints that may affect site development; • Assessment of major public and private utility capacities and connections for providing service to the Project;
• Assessment of site drainage and wate1way issues that may affect site development; • Submit Preliminary Planning Application
• Discuss with the City any subsequent deposits necessary, to offset the costs for retention of fi.niher consultants;
• Review of any site easements or other use restrictions that may affect site development;
• Create Construction drawings;
• Review of Title as it may affect site development and financing of development; • Obtain Planning and Development permits and tentative map; • Pursue necessary financing commitments; and
• Other tasks as appropriate to meet project goals.
Exhibit B
-4-
AMENDMENT NO. 1
TO THE EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT BETWEEN
THE CITY OF SANTA CLARA, CALIFORNIA
AND HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
PREAMBLE
This agreement ("Amendment No. 1 ") is entered into on this I~]]: day of DQ<.'t?lv\M)t 2020, ("Effective Date") by and between the City of Santa Clara, a chartered California municipal corporation ("City"), and Habitat for Humanity East Bay/Silicon Valley, Inc., a California Non-Profit Corporation ("Developer"). City and Developer may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled "Exclusive Negotiating Rights Agreement" dated April 9, 2019 and fully executed on June 17, 2019 (the "Original Agreement").
B. The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cruz Boulevard (APN 101-15-049) (the "Property"). The Developer has proposed to develop the Property with 13 units of affordable ownership housing, including mixed-income townhomes and flats (the "Project"). The entire project is proposed to be affordable to households with income between 60% and 120% of Area Median Income (AMI).
C. The Original Agreement established procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the "ODA") pursuant to which the Developer will conduct specified development activities related to the Property.
D. The Original Agreement provided a Negotiating Period of 18 months, which is set to expire on December 17, 2020. The Original Agreement also authorized two extensions of six (6) months each, upon presentation of a written request by the Developer, and provided that an amendment to the Original Agreement was executed by the Developer and the City Manager.
E. On November 12, 2020, the Developer submitted a written request for the first six-month extension. Through this Amendment No. 1, the Parties intend to approve that first six-month extension .
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Original Agreement, entitled "Negotiating Period," is hereby deleted and replaced in its entirety to read as follows:
Amendment No. I to Habitat ENA Page I of3
"2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be eighteen (18) months, commencing on the date this Agreement is fully executed, for an initial Negotiating Period of June 17, 2019 to December 17, 2020.
The parties have mutually agreed to extend the negotiating period for six (6) months, commencing on December 17, 2020 and terminating at 11 :59 p.m. on June 17, 2021.
The Developer may request an additional six (6) month extension by submitting a written request together with a schedule of tasks to be accomplished during the additional period. Granting of such extension shall be at the discretion of the City Manager and shall only be effective upon the execution of a subsequent amendment to the Agreement.
If a DOA has not been executed by the City and the Developer (or its affiliate) by June 17, 2021, and no additional extension has been approved through an additional amendment to this Agreement, then this Agreement shall terminate and no party shall have any further rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a DOA is executed by the City and the Developer (or its affiliate), then, upon such execution, this Agreement shall terminate, and all rights and obligations of the Parties shall be as set forth in the executed DOA."
2. Except as set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. In case of a conflict in the terms of the Original Agreement and this Amendment No. 1, the provisions of this Amendment No. 1 shall control.
3. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 1 as evidenced by the following signatures of their duly authorized representatives.
Amendment No. I to Habitat ENA Page 2 of3
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated: ___ l'H_l'-f_._,_WJ;-_' _o ____ _ ~f.--
BRIAN DOYLE
City Attorney
~/ DEA~~~ JSANTANA
City Manager
"CITY"
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
a California non-profit corporation
Amendment No. I to Habitat ENA
Dated: I 2.- \ l-\ L-\
2619 Broadway
Oakland, CA 94612
[email protected]
Telephone: (510) 251-6304
Fax: (510) 251-6309
"DEVELOPER"
AMENDMENT NO. 2
TO THE EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT BETWEEN
THE CITY OF SANTA CLARA, CALIFORNIA
AND HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
PREAMBLE
This agreement ("Amendment No. 2") is entered into on this \11li day of 'J\JL \I , 2021, ("Effective Date") by and between the City of Santa Clara, a charteredCalitornia municipal corporation ("City"), and Habitat for Humanity East Bay/Silicon Valley, Inc., a California Non-Profit Corporation ("Developer"). City and Developer may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled "Exclusive Negotiating Rights Agreement" dated April 9, 2019 and fully executed on June 17, 2019 (the "Original Agreement").
B. The Parties previously entered into an agreement entitled "Amendment No. 1 To The Exclusive Negotiating Rights Agreement" dated December 17, 2020 (First Amendment).
C. The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cruz Boulevard (APN 101-15-049) (the "Property"). The Developer has proposed to develop the Property with 13 units of affordable ownership housing, including mixed-income townhomes and flats (the "Project"). The entire project is proposed to be affordable to households with income between 60% and 120% of Area Median Income (AMI).
D. The Original Agreement established procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the "ODA") pursuant to which the Developer will conduct specified development activities related to the Property.
E. The Original Agreement provided a Negotiating Period of 18 months, which is set to expire on December 17, 2020. The Original Agreement also authorized two extensions of six (6) months each, upon presentation of a written request by the Developer, and provided that an amendment to the Original Agreement was executed by the Developer and the City Manager.
F. The First Amendment to Agreement provided a six (6) month extension which is set to expire on June 17, 2021. The Original Agreement authorizes one more extension of six (6) months.
NOW, THEREFORE, the Parties agree as follows:
Amendment No. 2 to Habitat ENA Page I of3
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the First Amendment Agreement, entitled "Negotiating Period," is hereby deleted and replaced in its entirety to read as follows:
"2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be eighteen (18) months, commencing on the date this Agreement is fully executed, for an initial Negotiating Period of June 17, 2019 to December 17, 2020.
The parties mutually agreed to extend the negotiating period for six (6) months, commencing on December 17, 2020 and terminating at 11 :59 p.m. on June 17, 2021. The parties have mutually agreed to a second extension of the negotiating period for six (6) months, commencing on the date this Amendment is fully executed and terminating at 11 :59 p.m. on December 30, 2021.
If a DOA has not been executed by the City and the Developer ( or its affiliate) by December 30, 2021, and no additional extension has been approved through an additional amendment to this Agreement, then this Agreement shall terminate and no party shall have any further rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a DOA is executed by the City and the Developer (or its affiliate), then, upon such execution, this Agreement shall terminate, and all rights and obligations of the Parties shall be as set forth in the executed DOA."
2. Except as set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. In case of a conflict in the terms of the Original Agreement, Amendment No. 1, or this Amendment No. 2, the provisions of this Amendment No. 2 shall control.
3. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 2 as evidenced by the following signatures of their duly authorized representatives.
Amendment No. 2 to Habitat ENA Page 2 of3
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated: __ 1_[,__t_1,,,,_/11Tu_( ____ _
BRIAN DOYLE
City Attorney
~~ANA
Cit~
"CITY"
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
a California non-profit corporation
Dated: ~,~ { lo7-l
By:_-~ _____;;. __________ _
Amendment No. 2 to Habitat ENA
JA JENSEN
Pr t & CEO
2619 Broadway
Oakland, CA 94612
[email protected]
Telephone: (510) 251-6304
Fax: (510) 251-6309
"DEVELOPER"
AMENDMENT NO. 3
TO THE EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT BETWEEN
THE CITY OF SANTA CLARA, CALIFORNIA
AND HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
PREAMBLE
This agreement ("Amendment No. 3") is entered into on this Q_,QU=' day of Q~eh'\~ 2021, ("Effective Date") by and between the City of Santa Clara, a chartered California municipal corporation ("City"), and Habitat for Humanity East Bay/Silicon Valley, Inc., a California Non-Profit Corporation ("Developer''). City and Developer may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled "Exclusive Negotiating Rights Agreement" dated April 9, 2019 and fully executed on June 17, 2019 (the "Original Agreement").
B. The Parties previously entered into an agreement entitled "Amendment No. 1 To The Exclusive Negotiating Rights Agreement" dated December 17, 2020 (First Amendment).
C. The Parties previously entered into an agreement entitled "Amendment No. 2 to the Exclusive Negotiating Rights Agreement" dated July 12, 2021 (Second Amendment).
C. The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cruz Boulevard (APN 101-15-049) (the "Property"). The Developer has proposed to develop the Property with 13 units of affordable ownership housing, including mixed-income townhomes and flats (the "Project"). The entire project is proposed to be affordable to households with income between 60% and 120% of Area Median Income (AMI).
D. The Original Agreement established procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the "DOA") pursuant to which the Developer will conduct specified development activities related to the Property.
E. The Original Agreement provided a Negotiating Period of 18 months, which expired on December 17, 2020.
F. The First Amendment to Agreement provided a six (6) month extension which expired on June 17, 2021 .
G. The Second Amendment to Agreement provided a six (6) month extension which is set to expire on December 30, 2021 .
Amendment No. 3 to Habitat ENA Page I of3
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Second Amendment Agreement, entitled "Negotiating Period," is hereby deleted and replaced in its entirety to read as follows:
"2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be eighteen (18) months, commencing on the date this Agreement is fully executed, for an initial Negotiating Period of June 17, 2019 to December 17, 2020.
The parties mutually agreed to extend the negotiating period for six (6) months, commencing on December 17, 2020 and terminating at 11 :59 p.m. on June 17, 2021. The parties mutually agreed to a second extension of the negotiating period for six (6) months, terminating at 11 :59 p.m. on December 30, 2021. The parties have mutually agreed to a third extension of the negotiating period for six (6) months, commencing on December 30, 2021 and terminating at 11 :59 p.m. on June 30, 2022. This date may be extended for a period of an additional six (6) months upon presentation of a written request from the Developer together with a schedule of tasks to be accomplished during the additional period. Granting of such extension shall be at the discretion of the City Manager and shall only be effective upon the execution of an amendment to this agreement.
If a DOA has not been executed by the City and the Developer (or its affiliate) by June 30, 2022, and no additional extension has been approved through an additional amendment to this Agreement, then this Agreement shall terminate and no party shall have any further rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a DOA is executed by the City and the Developer (or its affiliate), then, upon such execution, this Agreement shall terminate, and all rights and obligations of the Parties shall be as set forth in the executed DOA."
2. Except as set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. In case of a conflict in the terms of the Original Agreement, Amendment No. 1, Amendment No. 2, or this Amendment No. 3, the provisions of this Amendment No. 3 shall control.
3. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
The Parties acknowledge and accept the terms and conditions of this Amendment No. 3 as evidenced by the following signatures of their duly authorized representatives.
Amendment No. 3 to Habitat ENA Page 2 of3
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated: __ /L...-~-'-+-/ ....... ~-/4>""'---',.L-D.----=o/---- Office t y Attorney
City of Santa Clara
0<1V' D NN J. SAN AN t Ci Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
"CITY"
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
a California non-profit corporation
Amendment No. 3 to Habitat ENA
Dated: l/ ( 1~/ZOZ-I
By: ___ ___________ _
JA IC JENSEN
Pres· & CEO
2619 Broadway
Oakland, CA 94612
[email protected]
Telephone: (510) 251-6304
Fax: (510) 251-6309
"DEVELOPER"
AMENDMENT NO. 4
TO THE EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT BETWEEN
THE CITY OF SANTA CLARA, CALIFORNIA
AND HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
PREAMBLE
This agreement ("Amendment No. 4") is entered into on this ( [ ~ day of Ooh,ke,,- 2022, ("Effective Date") by and between the City of Santa Clara, a chartered California municipal corporation ("City"), and Habitat for Humanity East Bay/Silic.on Valley, Inc., a California Non-Profit Corporation ("Developer"). City and Developer may be referred to individually as a "Party" or collectively as the "Parties" or the "Parties to this Agreement."
RECITALS
A. The Parties previously entered into an agreement entitled "Exclusive Negotiating Rights Agreement" dated April 9, 2019 and fully executed on June 17, 2019 (the "Original Agreement").
B. The Parties previously entered into an agreement entitled "Amendment No. 1 to·the Exclusive Negotiating Rights Agreement" dated December 17, 2020 (Fi~st Amendment). ·
C. )"he Parties previously entered into an agreement entitled "Amendment No. 2 to the Exclusive Negotiating Rights Agreement" dated July 12, 2021 (Second Amendment).
D. The Parties p·reviously entered into an agreement entitled "Amendment . No. 3 to the Exclusive Negotiating Rights Agreement" dated December 20, 2021 (Third Amendment). ·
E. The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cruz Boulevard (APN 101-15-049) (the "Property"). The Developer has proposed to develop the Property with 15 units of affordable ownership housing, including mixed-income townhomes and flats (the "Project"). The entire project is proposed to be affordable to households with income between 50% and 120% of Area Median Income (AMI).·
F. The Original Agreement established procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the "DOA") pursuant to which the Developer will conduct specified development activities related to the Property.
G. The Original Agreement provided a Negotiating Period of 18 months, which expired on December 17, 2020.
H. The First Amendment to Agreement provided a six (6) month extension which expired on June 17, 2021.
Amendment No. 4 to Habitat ENA Page I of4
I. The Second Amendment to Agreement provided a six (6) month extension which expired on December 30, 2021.
J. The Third Amendment to Agreement provided a six (6) month extension which expired on June 30, 2022.
K. This Fourth Amendment to Agreement provides a six (6) month extension which is set to expire on December 30, 2022.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Second Amendment Agreement, entitled "Negotiating Period," is hereby deleted and replaced in its entirety to read as follows:
"2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be eighteen (18) months, commencing on the date this Agreement is fufly executed, for an initial Negotiating Period of June 17, 2019 to December 17, 2020.
The parties mutually agreed to exterid the negotiating period for six (6) months, commencing on December 17, 2020 and terminating at 11 :59 p.rn. on June 17, 2021. The partie·s mutually agreed to a second extension of the negotiating period. for six (6) months, terminating at 11 :59 p.m. on December 30, 2021. The parties mutually agreed to a third extension of the negotiating period for six (6) months, commencing on December 30, 2021 and terminating at 11 :59 p.m. on June 30, 2022. The parties have mutually agreed to a fourth extension of the negotiating period for six (6) months, commencing on July 1, 2022 and terminating at 11 :59 p.m. on December 30th, 2022. This date may be extended for a period of an additional six (6) months upon presentation of a written request from the Developer together with a schedule of tasks to be accomplished during the additional period. Granting of such extension shall be at the discretion of the City Manager" and shall only be effective upon the execution of an amendment to this agreement.
If a DOA has not been executed by the City and the Developer (or its affiliate) by December 30, 2022, and no additional extension has been approved through an additional amendment to this Agreement, then this Agreement shall terminate and no party shall have any further rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a ODA is executed by the City and the Developer (or its affiliate), then, upon such execution, this Agreement shall terminate, and all rights and obligations of the Parties shall be as set forth in the executed DOA."
Amendment No. 4 to Habitat ENA Page 2 of4
2. Except as set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. In case of a conflict in the terms of the Original Agreement, Amendment No. 1, Amendment No. 2, Amendment No. 3, or this Amendment No. 4, the provisions of this Amendment No. 4 shall control.
3. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
Amendment No. 4 to Habitat ENA Page 3 of 4
The Parties acknowledge and accept the terms and conditions of this Amendment No. 4 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
ApprJ s to Form:
Office of the City Attorney .
City of Santa Clara
Dated:
f
"CITY"
Ra·B v Batra
Cit Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: ( 408) 615-2210
Fax: (408) 241 -6771
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
a California non-profit corporation
Amendment No. 4 to Habitat ENA
Dated: ID f OS'/ 2.-02-2-
By ~-
-~ ENSEN
President & CEO
2619 Broadway
Oakland, CA 94612
[email protected]
Telephone: (510) 251-6304
Fax: (510) 251-6309
"DEVELOPER"
Amendment No. 5 to Habitat ENA Page 1 of 4
AMENDMENT NO. 5
TO THE EXCLUSIVE NEGOTIATING RIGHTS AGREEMENT BETWEEN
THE CITY OF SANTA CLARA, CALIFORNIA
AND HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
PREAMBLE
This agreement (“Amendment No. 5”) is entered into on this _____ day of _______, 2022, (“Effective Date”) by and between the City of Santa Clara, a chartered California municipal corporation (“City”), and Habitat for Humanity East Bay/Silicon Valley, Inc., a California Non-Profit Corporation (“Developer”). City and Developer may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”
RECITALS
A. The Parties previously entered into an agreement entitled “Exclusive Negotiating Rights Agreement” dated April 9, 2019 and fully executed on June 17, 2019 (the “Original Agreement”).
B. The Parties previously entered into an agreement entitled “Amendment No. 1 to the Exclusive Negotiating Rights Agreement” dated December 17, 2020 (First Amendment).
C. The Parties previously entered into an agreement entitled “Amendment No. 2 to the Exclusive Negotiating Rights Agreement” dated July 12, 2021 (Second Amendment).
D. The Parties previously entered into an agreement entitled “Amendment No. 3 to the Exclusive Negotiating Rights Agreement” dated December 20, 2021 (Third Amendment).
E. The Parties previously entered into an agreement entitled “Amendment No. 4 to the Exclusive Negotiating Rights Agreement” dated October 11, 2022 (Fourth Amendment).
F. The City is the owner of a .69-acre parcel of real property in the City of Santa Clara located at 3575 De La Cruz Boulevard (APN 101-15-049) (the “Property”). The Developer has proposed to develop the Property with 15 units of affordable ownership housing, including mixed-income townhomes and flats (the “Project”). The entire project is proposed to be affordable to households with income between 50% and 120% of Area Median Income (AMI).
G. The Original Agreement established procedures and standards for the negotiation by the City and the Developer of a Disposition and Development Agreement (the “DDA”) pursuant to which the Developer will conduct specified development activities related to the Property.
H. The Original Agreement provided a Negotiating Period of 18 months, which expired on December 17, 2020.
Amendment No. 5 to Habitat ENA Page 2 of 4
I. The First Amendment to Agreement provided a six (6) month extension which expired on June 17, 2021.
J. The Second Amendment to Agreement provided a six (6) month extension which expired on December 30, 2021.
K. The Third Amendment to Agreement provided a six (6) month extension which expired on June 30, 2022.
L. The Fourth Amendment to Agreement provided a six (6) month extension which will expire on December 30, 2022.
M. This Fifth Amendment to Agreement provides a six (6) month extension which is set to expire on June 30, 2023.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Section 2 of the Fourth Amendment Agreement, entitled “Negotiating Period,” is hereby deleted and replaced in its entirety to read as follows:
“2. Negotiating Period. The negotiating period (the "Negotiating Period") under this Agreement shall be six (6) months, commencing on the date this Agreement is fully executed, for a Negotiating Period of December 30, 2022 through June 30, 2023. The parties mutually agreed to extend the negotiating period for six (6) months, commencing on December 17, 2020 and terminating at 11:59 p.m. on June 17, 2021. The parties mutually agreed to a second extension of the negotiating period for six (6) months, terminating at 11:59 p.m. on December 30, 2021. The parties mutually agreed to a third extension of the negotiating period for six (6) months, terminating at 11:59 p.m. on June 30, 2022. The parties mutually agreed to a fourth extension of the negotiating period for six (6) months, terminating at 11:59 p.m. on December 30, 2022. The parties mutually agree to this fifth extension of the negotiating period for six (6) months, commencing on December 30, 2022 and terminating at 11:59 p.m. on June 30, 2023. This date may be extended for a period of an additional six (6) months upon presentation of a written request from the Developer together with a schedule of tasks to be accomplished during the additional period. Granting of such extension shall be at the discretion of the City Manager and shall only be effective upon the execution of an amendment to this agreement.
If a DDA has not been executed by the City and the Developer (or its affiliate) by June 30, 2023, and no additional extension has been approved through an additional amendment to this Agreement, then this Agreement shall terminate and no party shall have any further Amendment No. 5 to Habitat ENA Page 3 of 4
rights or obligations under this Agreement, except as set forth in Section 4 and Section 11. If a DDA is executed by the City and the Developer (or its affiliate), then, upon such execution, this Agreement shall terminate, and all rights and obligations of the Parties shall be as set forth in the executed DDA.”
2. Except as set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. In case of a conflict in the terms of the Original Agreement, Amendment No. 1, Amendment No. 2, Amendment No. 3, Amendment No. 4, or this Amendment No. 5, the provisions of this Amendment No. 5 shall control.
3. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
Amendment No. 5 to Habitat ENA Page 4 of 4
The Parties acknowledge and accept the terms and conditions of this Amendment No. 5 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated:
Office of the City Attorney
City of Santa Clara
Rajeev Batra
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“CITY”
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY, INC.
a California non-profit corporation
Dated: _______________________________
By: _
JANICE JENSEN
President & CEO
2619 Broadway
Oakland, CA 94612
[email protected]
Telephone: (510) 251-6304
Fax: (510) 251-6309
“DEVELOPER”
3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 1 of 8 Rev: 02-01-15
EBIX No. S200004223
AEMENDMENT NO. 3 TO THE AMENDED AND RESTATED
REPLACEMENT LICENSE AGREEMENT
GRANTING RIGHT OF ENTRY TO AND ALLOWING ACCESS ON
CERTAIN CITY OWNED PROPERTY PREAMBLE
This license agreement (“License”) is entered into by and between the City of Santa Clara, California, a chartered California municipal corporation, with its principal place of business located at 1500 Warburton Avenue, Santa Clara, CA 95050 (“City”), and Habitat for Humanity East Bay/Silicon Valley, a 501(c)(3) not-for-profit organization, with its principal place of business located at 2619 Broadway, Oakland, CA 94612, (“Licensee”), for the purpose of providing Licensee the temporary right of access to Property described in this License and the right to use it for the activities referred to in this License. City and Licensee may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this License.” The Parties to this License agree that the rights, privileges, and obligations granted by this License are set forth as follows:
LICENSE PROVISIONS:
1. PERMITTED ACTIVITIES
In response to Licensee’s request that City grant a temporary license to Licensee for access to certain City owned real property located at 3575 De La Cruz Boulevard (the “Property”) and in consideration of the sum of Zero dollars ($0.00) and other good and valuable consideration, City hereby grants Licensee a revocable license to use Property for the specific and limited use and purpose as set forth in this License. The Property is more specifically described in Exhibit A, attached and incorporated by this reference.
Said temporary access to the Property is granted to Licensee, its employees, agents and contractors for the sole purpose of conducting the following activities:
A. Use. Licensee, its employees, agents and contractors are authorized to enter on and cross over Property only for the limited purpose of conducting a property survey and geotechnical, environmental, and utility studies and to perform the necessary activities related to such limited purpose. It is understood by the Parties that the use(s) permitted under this License is/are limited to the purposes described above.
B. Access. Licensee is granted limited rights of access to the Property by this License. Licensee’s access to the Property will be from De La Cruz Boulevard, the public road adjacent to the Property. Vehicular travel on the Property will be 3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 2 of 8 Rev: 02-01-15
limited to areas outlined in Exhibit A. Licensee must provide notice to the City requesting access to the Property as outlined in Exhibit B.
C. Gates. Licensee agrees to keep all gates it utilizes closed if found to be closed, or open if found to be open.
D. Weather. All activities will be conducted on a “weather permitting” basis.
Licensee shall use its best efforts to keep surface disturbances to a minimum and avoid rutting of any roads. Any damage caused to the Property or any underground electrical ducts, storm sewer and water lines, manholes and appurtenances located on or under the surface of the Property or to any roads shall be promptly repaired by Licensee. The roads or any other area shall not be left in a rutted or otherwise damaged condition.
E. Prohibitions and Limitations. Except as may be required to accomplish the permitted use(s) described in subsection 1A, above, the use(s) and activities authorized under this License shall not:
1. significantly disturb the surface of the Property
2. be inconsistent with those permitted on the Property
3. interfere in any way with the City’s ownership rights and privileges on the property; and/or
4. cause or contribute in any way to the contamination of all or any portion of the Property, by any substance, especially Hazardous Materials as that term is defined in section 4 of this License.
2. TERM OF THE LICENSE
In order to align with the term of Amendment No. 5 to the Exclusive Negotiating Rights Agreement between the City of Santa Clara, California and Habitat for Humanity East Bay/Silicon Valley, Inc., City grants this License for temporary access to the Property to Licensee for a time period commencing on the Effective date of the License and ending on June 30, 2023. Upon prior written approval by the City Manager or her designee, a six (6) month extension of the term of this License may be granted after Licensee submits a written request to City which justifies the extension.
3. RETURN PROPERTY TO EXISTING CONDITION
Immediately upon completion of the use of the Property permitted by this License, or upon the expiration of the term of this License, whichever occurs first, Licensee shall restore the Property to substantially the same condition as it was existing prior to Licensee’s use, as determined by City representatives. At that time, Licensee shall remove from the Property any and all equipment or materials used in conducting the 3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 3 of 8 Rev: 02-01-15
permitted activities. Licensee expressly acknowledges its financial obligation to fulfill this condition promptly. Licensee shall repair any damage caused to the existing underground electric ducts, storm sewer and water lines, manholes and\or appurtenances located on, above or under the surface of the Property.
4. HAZARDOUS MATERIALS ON THE PROPERTY
A. Licensee shall not use or store Hazardous Materials of any kind on or near the Property which could contaminate the Property, without prior written permission from City. Subject to Section 4.D. below, in the event that any Hazardous Material is spilled or leaked or otherwise released on the Property or any area in the vicinity of the Property as a result of Licensee’s exercise of this License, Licensee shall promptly take all steps necessary to remove any contamination resulting from such activities. Licensee accepts full responsibility for all activities and costs incurred related to cleaning up the Property from the effects of such spill or leak. Licensee shall be responsible for meeting, and possess the means to satisfy, the requirements of all federal, state and local controlling agencies, such as the Bay Area Water Quality Management District and/or the Environmental Protection Agency, which may have jurisdiction over the region in which the Property is located or over the substance being used by Licensee on the Property.
B. Hazardous Materials Defined. The term “Hazardous Material(s)” shall mean any toxic or hazardous substance, material or waste or any pollutant or contaminant or infectious or radioactive material, including but not limited to, those substances, materials or wastes regulated now or in the future under any of the following statutes or regulations and any and all of those substances included within the definitions of “hazardous substances,” “hazardous waste,” “hazardous chemical substance or mixture,” “imminently hazardous chemical substance or mixture,” “toxic substances,” “hazardous air pollutant,” “toxic pollutant” or “solid waste” in the (a) “CERCLA” or “Superfund” as amended by SARA, 42 U.S.C.
Sec. 9601 et seq., (b) RCRA, 42 U.S.C. Sec. 6901 et seq., (c) CWA., 33 U.S.C.
Sec. 1251 et seq., (d) CAA, 42 U.S.C. 78401 et seq., (e) TSCA, 15 U.S.C. Sec. 2601 et seq., (f) The Refuse Act of 1899, 33 U.S.C. Sec. 407, (g) OSHA, 29 U.S.C. 651 et seq. (h) Hazardous Materials Transportation Act, 49 U.S.C. Sec. 1801 et seq., (i) USDOT Table (40 CFR Part 302 and amendments) or the EPA Table (40 CFR Part 302 and amendments), (j) California Superfund, Cal. Health & Safety Code Sec. 25300 et seq., (k) Cal. Hazardous Waste Control Act, Cal.
Health & Safety Code Section 25100 et seq., (l) Porter-Cologne Act, Cal. Water Code Sec. 13000 et seq., (m) Hazardous Waste Disposal Land Use Law, Cal.
Health & Safety Code Sec. 25220 et seq., (n) “Proposition 65,” Cal. Health and Safety Code Sec. 25249.5 et seq., (o) Hazardous Substances Underground Storage Tank Law, Cal. Health & Safety Code Sec. 25280 et seq., (p) California Hazardous Substance Act, Cal. Health & Safety Code Sec. 28740 et seq., (q) Air Resources Law, Cal. Health & Safety Code Sec. 39000 et seq., (r) Hazardous 3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 4 of 8 Rev: 02-01-15
Materials Release Response Plans and Inventory, Cal. Health & Safety Code Secs. 25500-25541, (s) TCPA, Cal. Health and Safety Code Secs. 25208 et seq., and (t) regulations promulgated pursuant to said laws or any replacement thereof, or as similar terms are defined in the federal, state and local laws, statutes, regulations, orders or rules. Hazardous Materials shall also mean any and all other substances, materials and wastes which are, or in the future become regulated under applicable local, state or federal law for the protection of health or the environment, or which are classified as hazardous or toxic substances, materials or wastes, pollutants or contaminants, as defined, listed or regulated by any federal, state or local law, regulation or order or by common law decision, including, without limitation, (i) trichloroethylene, tetrachloroethylene, perchloroethylene and other chlorinated solvents, (ii) any petroleum products or fractions thereof, (iii) asbestos, (iv) polychlorinated biphenyls, (v) flammable explosives, (vi) urea formaldehyde, and (vii) radioactive materials and waste.
C. Hazardous Materials Indemnity. Subject to Section 4.D. below, Licensee shall indemnify, defend (by counsel reasonably acceptable to City), protect and hold City harmless from and against any and all claims, liabilities, penalties, forfeitures, losses and/or expenses (including, without limitation, diminution in value of the Property, damages for the loss or restriction on use of the rentable or usable space or of any amenity of the Property, damages arising from any adverse impact or marketing of the Property and sums paid in settlement of claims, response costs, cleanup costs, site assessment costs, attorneys’ fees, consultant and expert fees, judgments, administrative rulings or orders, fines, costs of death of or injury to any person or damage to any property whatsoever (including, without limitation, groundwater, sewer systems and atmosphere), arising from, or caused or resulting, either prior to or during the term of this License, in whole or in part, directly or indirectly, by the presence or discharge in, on, under or about the Property by Licensee, Licensee’s agents, employees, licensees or invitees or at Licensee’s direction of Hazardous Material, or by Licensee’s failure to comply with any Hazardous Materials Law, whether knowingly or by strict liability.
Licensee’s indemnification obligations shall include, without limitation, and whether foreseeable or unforeseeable, all costs of any required or necessary Hazardous Materials management plan, investigation, repairs, cleanup or detoxification or decontamination of the Property, and the presence and implementation of any closure, remedial action or other required plans, and shall survive the expiration of or early termination of the term of this License. For purposes of the indemnity provided herein, any acts or omissions of Licensee, or its employees, agents, customers, sublessees, assignees, contractors or subcontractors of Licensee (whether or not they are negligent, intentional, willful or unlawful) shall be strictly attributable to Licensee.
D. Notwithstanding anything to the contrary contained in this Section 4 Licensee shall not be liable for clean up of the exacerbation of pre-existing Hazardous 3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 5 of 8 Rev: 02-01-15
Materials located on the Property (“Pre-existing Materials”) that might be caused by Licensee’s activities hereunder, including, but not limited to, the movement of Hazardous Materials between levels of soils or into groundwater, nor shall Licensee’s indemnification in Section 4.C. apply to any discovery or exacerbation of Pre-existing Materials.
5. HOLD HARMLESS/INDEMNIFICATION
To the extent permitted by law, Licensee hereby agrees to protect, defend, hold harmless, and indemnify City, its council, officers, employees, agents, successors, and assigns, from and against all claims, injury, liability, loss, cost, and expense, or damage however same may be caused, including without limitation, all costs and reasonable attorney’s fees in providing a defense to any claim arising therefrom, or any loss of or damage to property (real and/or personal), and for personal injury to or the death of any person or persons, arising out of, occurring by reason of, or in any way connected with, Licensee’s operations, acts, errors, omissions or use of the Property or exercise of it rights under this License, except to the extent arising out of the negligence or willful misconduct of City.
6. INSURANCE REQUIREMENTS
During the term of this License, Licensee, and each of its contractors and agents which enter onto the Property to carry out permitted activities, shall each maintain in full force and effect the following insurance policies:
A. Commercial general liability policy (bodily injury and property damage); B. Comprehensive automobile liability insurance policy; and C. Worker’s Compensation and employer’s liability policy.
Said policies shall be maintained with respect to employees, volunteers, participants and spectators and vehicles using the Property with coverage amounts and including the required endorsements, certificates of insurance, and coverage verifications as defined in Exhibit C, attached and incorporated by this reference.
7. CITY’S RIGHTS
City reserves the right to use the Property in any manner, provided such use does not unreasonably interfere with the rights granted to the Licensee in this License.
8. ASSIGNMENT - EXCLUSIVE TO LICENSEE
The access rights granted in this License are personal and limited solely to Licensee and its employees for the stated purpose set forth in this License. Licensee agrees not to commit waste or to construct, allow or maintain any use, construction or operate any equipment which constitutes a nuisance on the Property or which may in any way 3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 6 of 8 Rev: 02-01-15
interfere with the use, enjoyment or possession of the Property by City, or the City’s lessee(s) or licensee(s) on the Property, if any. The Property shall not be used by any person or entity, including the Licensee or its employees, for any purpose other than stated in this License. Neither this License, nor the rights granted to Licensee within it, shall be assignable or otherwise transferable without the prior written consent of City.
Unless specifically stated to the contrary in any written consent to an assignment, no assignment or other transfer will release or discharge the Licensee from any duty, responsibility or liability under this License.
9. REVOCATION OR TERMINATION OF LICENSE
This License may be revoked or terminated with or without cause by City immediately upon providing written notice of said revocation or termination to Licensee, or its representative. If any notice given pursuant to the License is not personally delivered to Licensee, said notice shall be deemed to be delivered five (5) days after deposit of said notice in a sealed envelope, postage fully prepaid, in a mailing facility regularly maintained by the United States Post Office Department, addressed as follows:
If to Licensee:
Janice Jensen
Habitat for Humanity East Bay/Silicon Valley
2619 Broadway
Oakland, CA 94612
and to City at:
City of Santa Clara
Attention: City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
or by facsimile at (408) 241-6771
10. AUTHORITY TO GRANT LICENSE
City warrants that it is the owner of the Property and that it has the full rights and authority to grant the rights to the Licensee which are contained in this License.
11. LICENSE TO BE CARRIED ON SITE
This License, or a copy of the License, must be in the immediate possession of Licensee’s representative at all times while on the Property.
3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 7 of 8 Rev: 02-01-15
12. COUNTERPARTS
This License may be executed in two counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.
13. FACSIMILE SIGNATURE
The Parties agree that signatures on this License, including those transmitted by facsimile, shall be sufficient to bind the Parties.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
3rd Amendment to Amend/Restated Replacement License Agreement/Habitat for Humanity Page 8 of 8 Rev: 02-01-15
The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives. The Effective Date is the date that the final signatory executes the Agreement. It is the intent of the Parties that this Agreement shall become operative on the Effective Date.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
APPROVED AS TO FORM:
Dated: ________________________
Office of the City Attorney
City of Santa Clara
“CITY”
Rajeev Batra
City Manager
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
HABITAT FOR HUMANITY EAST BAY/SILICON VALLEY
Dated:
S:\Attorney\AGREEMENTS\License\Right of Entry License Agreement (Form).doc By:
(Signature of Person executing the Agreement)
Name: Janice Jensen
Address: 2619 Broadway
Oakland, CA 94612
Telephone 510-251-6304
Fax: 510-251-6309
“LICENSEE”
AMENDMENT NO. 3 TO AMENDED AND RESTATED
REPLACEMENT LICENSE AGREEMENT
GRANTING RIGHT OF ENTRY TO AND ALLOWING ACCESS ON
CERTAIN CITY OWNED PROPERTY
EXHIBIT A
3rd Amendment to Amend/Restated Replacement License Agreement/ Habitat for Humanity /Exhibit A Page 1 of 1 Rev: 02-01-15
APN: 101-15-049
NOTICES
All access notices required under this Agreement shall be in writing and shall be delivered with a minimum 24 hour notice prior to requesting access. Notices shall be delivered to the City at:
City of Santa Clara
Attention: Housing and Community Services Division
1500 Warburton Avenue
Santa Clara, CA 95050
If by electronic mail:
[email protected]
copy to: [email protected]
The notice of request for site access shall include the following:
• Date/Time of requested access
• Anticipated length of time needed at the site
• Name(s) of firms and individuals to be on site
• Scope of work (i.e., the activities to be conducted) with a confirmation that any appropriate permits have been secured.
A representative of the City will arrange for the gates to be opened at its earliest convenience.
AMENDMENT NO. 3 TO AMENDED AND RESTATED
REPLACEMENT LICENSE AGREEMENT
GRANTING RIGHT OF ENTRY TO AND ALLOWING ACCESS ON
CERTAIN CITY OWNED PROPERTY
EXHIBIT B
3rd Amendment to Amend/Restated Replacement License Agreement/ Habitat for Humanity /Exhibit B Page 1 of 1 Rev: 02-01-15
The Insurance Certificate Must:
* The Insurance Certificate must: Be an original document. * List all subsidiaries or DBA’s covered by the certificate provided. * Provide at least 30 days’ notice of cancellation.
* Show complete insurance carrier names as listed in the A.M. Best Property & Casualty Guide * Be completed in its entirety and signed. Binders are not acceptable.
Commercial General Liability (CGL)
Occurrence form – requires coverage not less than:
$1,000,000 General Aggregate
$1,000,000 Products and Completed Operations Aggregate
$1,000,000 Personal and Advertising Injury
$1,000,000 Each Occurrence
* Coverage must be placed with a carrier rated not less than A- VI by A.M. Best & Co. * Additional Insured Endorsement Required. Attach a CG 2026 11/85 Additional Insured Endorsement, or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent, or CGL 090 74 18. * Additional Insured Wording must read: The City of Santa Clara, its City Council, commissions, officers, employees, agents and volunteers.
* Coverage must be Primary and Non-Contributory above any other insurance The City of Santa Clara, its City Council, commissions, officers, employees, agents and volunteers may carry.
Commercial Automobile Liability:
Must indicate coverage for Any Auto or Owned, Hired or Borrowed, and Non-owned Vehicles $1,000,000 Combined Single Limit
$1,000,000 Bodily Injury per Accident
Coverage must be placed with a carrier rated not less than A- VI by A.M. Best & Co.
Workers’ Compensation:
State Statutory Limits
Employers’ Liability Coverage
$1,000,000 Each Accident
$1,000,000 Disease – Policy Limit
$1,000,000 Disease – Each Employee
Certificate Holder:
City of Santa Clara
c/o Ebix BPO – Insurance Compliance
P.O. Box 100085 – S2 or 1 Ebix Way
Duluth, GA 30096 John’s Creek, GA 30097EBIX Inc.
Fax documents for compliance & verification of insurance requirements to (770) 325-0409 or Email to [email protected] - For customer service and inquires, call (951)766-2280 City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-171 Agenda Date: 12/6/2022
REPORT TO COUNCIL
SUBJECT
Action on a Resolution Authorizing the Use of City Electric Forces for New Dark Fiber Installations at Various Locations
COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure
BACKGROUND
Charter Section 1310 titled Contracts on Public Works states, in part, “that every contract involving an expenditure of more than one thousand dollars ($1,000) for the construction or improvement (excluding maintenance and repair) of public buildings, works, streets, drains, sewers, utilities, parks and playgrounds shall be let to the lowest responsible bidder.” The section further states that “the City Council may declare and determine that, in its opinion, the work in question may be performed better or more economically by the City with its own employees, and after the adoption of a resolution to this effect by at least four affirmative votes, it may proceed to have said work done in the manner stated, without further observance of the provisions of this section.” In 2014, the Electric Department developed a position called Fiber Splicing Technician as an inhouse position to primarily perform maintenance and repairs to meet the fiber performance standards of then existing fiber customers that includes both City departments as well as commercial lease customers. Fiber Splicing Technician activities include basic splicing and distribution changes to fiber optic cables. The technician can also perform duties such as pulling, laying, aligning and positioning fiber optic equipment to prepare for a new connection to the fiber network. Fiber Splicing Technicians perform fusion splicing at building entrances and in maintenance space. At this time, SVP employs two Fiber Splicing Technicians.
DISCUSSION
Currently, the SVP Fiber Enterprise serves SVP, other City department functions, and various commercial lease customers. As the work is specialized, the position of Fiber Splicer Technician performs a variety of activities from maintenance and repair to new or re-spliced interconnections to the SVP Fiber Enterprise. Each interconnection can be unique involving different hours of labor depending on the number of fibers required to be spliced and the particular location within the network. Technician time is tracked hourly and not on a per fiber basis.
Large or extensive projects involving extending fiber cable being laid along new paths or great distances or adding conduit or related infrastructure are done using a previously bid unit price Public Works contract with a private construction contractor. SVP spends up to $1 million per year on this public works contract for new Fiber network construction and certain maintenance and repair City of Santa Clara Page 1 of 4 Printed on 12/2/2022
powered by Legistar™
22-171 Agenda Date: 12/6/2022
activities.
Staff believes that the Fiber Splicer Technician work that may be required in new construction projects is best and most efficiently performed with City forces based upon the following factors: (1) the work is limited in size and scope; (2) City forces have knowledge and training in operating and maintaining and repairing the fiber optic system that can be leveraged to more economically perform this work; and (3) bidding out the work and contracting with a private entity would not likely result in a lower overall cost or time savings. Therefore, staff recommends that the City Council make a finding that City forces can better perform the Fiber Splicing and related equipment installation, splicing and connections to the existing SVP Fiber infrastructure and approve the use of City forces.
Estimate Number: FWM#01474
Location: 2972 Stender Way - 2300 Owen Street
Type of Service: Electric Utility Infrastracture
Description of Work: Splice, terminate and test fibers for a new point to point route from 2972 Stender Way to 2300 Owen Street
Estimated Cost: $4,774
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#01475
Location: 2972 Stender Way - 2360 Owen Street
Type of Service: Electric Utility Infrastracture
Description of Work: Splice, terminate and test fibers for a new point to point route from 2972 Stender Way to 2360 Owen Street
Estimated Cost: $5,523
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#01513
Location: 1201 Comstock Street - 2897 Northwestern Parkway Type of Service: Electric Utility Infrastracture
Description of Work: Decommission existing dark fiber route from 1201 Comstock Street to 2897 Northwestern Parkway
Estimated Cost: $1,841
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#01514
Location: 1201 Comstock Street - 2820 Northwestern Parkway Type of Service: Electric Utility Infrastracture
Description of Work: Decommission existing dark fiber route from 1201 Comstock Street to 2820 Northwestern Parkway
Estimated Cost: $1,841
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & City of Santa Clara Page 2 of 4 Printed on 12/2/2022
powered by Legistar™
22-171 Agenda Date: 12/6/2022
Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#01515
Location: 1101 Space Park Drive - 1201 Comstock Street
Type of Service: Electric Utility Infrastracture
Description of Work: Decommission existing dark fiber route from 1101 Space Park Drive to 1201 Comstock Street
Estimated Cost: $1,841
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
ENVIRONMENTAL REVIEW
Staff recommends that the City Council determine that the actions being considered are exempt from the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines (Title 14 of the California Code of Regulations) sections (1) 15302(c) (Class 2 - Replacement or Reconstruction) as the proposed work involves the replacement or reconstruction of existing utility systems and/or facilities involving negligible expansion of capacity, and (2) 15303 (Class 3 - New Construction or Conversion of Small Structures), because the proposed work involves the construction of a limited number of small fiber utility facilities.
FISCAL IMPACT
The funds to support the staff time for work performed by SVP and related construction materials for the work detailed in this report, totaling $15,820, are included in the Fiscal Year 2022/23 Capital Budget, Fiber Development, Design, and Expansion project in the Electric Utility Capital Fund. All referenced work will be performed with City Electric Forces (SVP staff). Some work associated with encroachment permits may be performed by the Department of Public Works (DPW). DPW costs are recovered through payment of permit fees.
COORDINATION
This report has been coordinated with the Finance Department and City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
Determine the proposed actions are exempt from CEQA pursuant to Sections 15302 (c) and 15303 of the California Code of Regulations and adopt a Resolution authorizing the use of City Electric Forces for work detailed in this report located at 2972 Stender Way to 2300 Owen Street, 2972 Stender Way to 2360 Owen Street, 1201 Comstock Street to 2897 Northwestern Parkway, 1201 Comstock Street to 2820 Northwestern Parkway, and 1101 Space Park Drive to 1201 Comstock Street.
City of Santa Clara Page 3 of 4 Printed on 12/2/2022
powered by Legistar™
22-171 Agenda Date: 12/6/2022
Reviewed by: Manuel Pineda, Chief Electric Utility Officer Approved by: Rajeev Batra, City Manager
ATTACHMENTS
1. Resolution - Use of City Electric Forces
City of Santa Clara Page 4 of 4 Printed on 12/2/2022
powered by Legistar™
Resolution/Use of City Electric Forces Page 1 of 2
Rev: 03-09-18
RESOLUTION NO. _____
A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA
AUTHORIZING THE USE OF CITY ELECTRIC FORCES
PURSUANT TO CHARTER SECTION 1310
BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
WHEREAS, the City of Santa Clara’s Charter section 1310 requires all contracts involving an expenditure of over $1,000 for the construction or improvement (excluding maintenance and repair) of a public works project to be let to the lowest responsible bidder; WHEREAS, Charter section 1310 permits the City to use its own employees if the City Council, by motion passed by at least four affirmative votes, determines that the public works may be done better or more economically by the City’s own employees, and, upon such determination, the City may proceed to have the public works project completed without further observance of Charter section 1310;
WHEREAS, the City’s Electric Department desires to perform certain public works, as set forth in the Report to Council, dated December 6, 2022, by its own employees; and, WHEREAS, the City’s Electric Department has presented facts supporting that that the work in question may be performed better or more economically by the City with its own employees.
NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. The City Council of the City of Santa Clara does hereby declare and determine that the public works set forth in the 22-171 Report to Council, attached hereto and incorporated by this reference, may be performed better or more economically by the City with its own employees. ///
///
///
Resolution/Use of City Electric Forces Page 2 of 2
Rev: 03-09-18
2. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE ___ DAY OF _________, 2022, BY THE FOLLOWING VOTE:
AYES: COUNCILORS:
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
ATTEST: ______________________________
NORA PIMENTEL, MMC
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
Attachments incorporated by reference: December 6, 2022, Report to Council #22-171 City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1449 Agenda Date: 12/6/2022
REPORT TO COUNCIL AND STADIUM AUTHORITY BOARD
SUBJECT
Action on a Resolution Delegating Authority to the City Manager to Execute Documents Associated with the State of California Local Assistance Specified Grant for the Central Park Arbor Playground (Magical Bridge All Inclusive Playground) and Related Budget Amendments
COUNCIL PILLAR
Enhance Community Sports, Recreational and Arts Assets
BACKGROUND
The Central Park Arbor Center Playground is a small, 1960’s era, metal, wood and natural stone play space that was identified in the 2017 Parks & Recreation Facility Condition Assessment as in “critical” condition and in need of replacement as well as being identified in the Central Park Master Plan as the location for an expanded, all ages and abilities community serving playground. On January 12, 2021, after extensive community outreach and recommendation from the Parks & Recreation Commission, Council approved the preferred schematic design (Project) and Ordinance No. 2028 (Measure R compliance).
The Project is to be funded through Capital Improvement Program funds from a variety of sources:
City in the amount of $1.8 million from Developer Contributions and Mitigation Fee Act in Lieu fees, County of Santa Clara All Inclusive Playground Grant funds in the amount of $1.765 million, and funds to be raised by the Magical Bridge Foundation through individual, community and corporate support. Given construction cost escalation and continued desire to fund a complete playground experience, the City sought and secured additional grant funding. In June 2022, the City was awarded State funds requested by California Assembly Member Alex Lee. In particular, the focus of the State Grant funds was to support the Project’s Scope of Work C "Additional/Alternate Playground Elements” inclusion of the hilltop area improvements, laser harp, sway boat, renovation of the amphitheater, “Look Out” balcony, and adult fitness stations.
DISCUSSION
The AB-179 Budget Act of 2022, section 19.56, B, 16, C awards $800,000 to the City of Santa Clara for the Magical Bridge All-Inclusive Playground in Central Park in the form of a Specified Grant. The State of California Grant program requires City adoption of a Resolution (Attachment 1) in order to submit a project application and to receive funds. Grant funds are to be used towards the playground items specified in Scope C as explained above. The Resolution confirms that the City has the funding to complete, operate and maintain the Project as noted below in the Fiscal Impact section of this report, and, if approved, will authorize the City Manager to administer the Grant.
ENVIRONMENTAL REVIEW
The action being considered, adoption of a Resolution for the acceptance and allocation of funds, City of Santa Clara Page 1 of 3 Printed on 12/2/2022
powered by Legistar™
22-1449 Agenda Date: 12/6/2022
does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(5) in that it is a governmental organizational or administrative activity that will not result in direct or indirect changes in the environment.
FISCAL IMPACT
The Central Park Arbor Playground Project in the Parks and Recreation Capital Fund has a current, remaining budget of $3,720,500. Current park maintenance activities are included in the City’s Parks & Recreation annual Operating Budget.
The State Grant appropriates new funding in the amount of $800,000 to increase the current project budget from $3,720,500 to $4,520,500. Any construction funding gaps will be requested from unallocated Park In-Lieu Fees at award of construction Bid, expected in early 2023.
Budget Amendment
FY 2022/23
Current Increase/
(Decrease)
Revised
Parks and Recreation Capital Fund
Revenues
Other Agencies Revenue $1,800,000 $800,000 $2,600,000
Expenditures
Central Park Arbor Playground Project $3,720,500 $800,000 $4,520,500
COORDINATION
This report has been coordinated with the City Attorney Office and Public Works Department and Finance Department.
PUBLIC CONTACT
Public contact was made by posting the City Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, e-mail [email protected] <mailto:[email protected]>.
RECOMMENDATION
1. Adopt a Resolution Delegating Authority to the City Manager to Execute all Documents Associated with State of California Local Assistance Specified Grant;
2. Approve the FY 2022/23 budget amendment to appropriate the State of California Local Assistance Specified Grant in the Parks and Recreation Capital Fund and increase the project appropriation by $800,000 (five affirmative Council votes required to appropriate additional revenue).
City of Santa Clara Page 2 of 3 Printed on 12/2/2022
powered by Legistar™
22-1449 Agenda Date: 12/6/2022
Reviewed by: James Teixeira, Director of Parks & Recreation Approved by: Rajeev Batra, City Manager
ATTACHMENTS
1. State of California 2022-23 Procedural Guide for Local Assistance Specified Grants
2. Resolution
City of Santa Clara Page 3 of 3 Printed on 12/2/2022
powered by Legistar™
2022-23
Procedural Guide
For
Local Assistance Specified Grants – Capital
September 2022
State of California
The Natural Resources Agency
Department of Parks and Recreation
Office of Grants and Local Services (OGALS)
“Creating Community through People, Parks, and Programs” Send Application and correspondence to your
Administrative Project Officer listed at: www.parks.ca.gov/grants/contacts Mailing Address:
State of California
Dept. of Parks and Recreation
P.O. Box 942896
Floor 13
Sacramento, CA 94296-0001
Attn: Office of Grants and Local Services
www.parks.ca.gov/grants
GRANTEE SPECIFIED GRANT PROCEDURAL GUIDE - CAPITAL
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
Department Mission
The mission of the California Department of Parks and Recreation is to provide for the health, inspiration, and education of the people of California by helping to preserve the state’s extraordinary biological diversity, protecting its most valued natural and cultural resources, and creating opportunities for high-quality outdoor recreation.
Office of Community Engagement Mission
The mission of the Community Engagement Division is to encourage healthy communities by connecting people to parks, supporting innovative recreational opportunities, embracing diversity, fostering inclusivity, and delivering superior customer leadership through quality customer services.
The Office of Grants and Local Services (OGALS) Mission Statement The mission of the Office of Grants and Local Services is to address California’s diverse recreational, cultural and historical resource needs by developing grant programs, administering funds, offering technical assistance, building partnerships and providing leadership through quality customer service.
OGALS VISION GOALS
To Be:
A leader among park and recreation professionals.
Proactive in anticipating public park and recreation needs and how new legislation and grant programs could best meet these needs.
Honest, knowledgeable, and experienced grant administration facilitators. Sensitive to local concerns while mindful of prevailing laws, rules, and regulations. Perceptive to opportunities for partnerships, growth and renewal where few existed before.
Committed to providing quality customer service in every interaction and transaction.
Responsive to the needs of applicants, GRANTEES, nonprofit organizations, local governments, legislative members, and department employees. 3 TABLE OF CONTENTS
I. INTRODUCTION ....................................................................................................... 4 II. GRANT PROCESS ................................................................................................... 4 Resolution Form......................................................................................................... 7 III. APPLICATION SECTION.......................................................................................... 8 APPLICATION PACKET checklist and directions.............................................................. 8 Additional Non-Profit Requirements......................................................................... 10 Project Application Form.......................................................................................... 11 PROJECT SCOPE/Cost Estimate Form...........................Error! Bookmark not defined.
Funding Sources Form ............................................................................................ 13 CEQA Compliance Certification Form...................................................................... 14 Development Project Eligible Costs and Rules........................................................ 15 Acquisition Projects.................................................................................................. 17 IV. CONTRACT SECTION............................................................................................ 19 Grant Contract ......................................................................................................... 19 Status Report........................................................................................................... 27 V. GRANT PAYMENT SECTION ................................................................................ 28 Payment Request Form........................................................................................... 33 Grant Expenditure Form .......................................................................................... 35 Project Completion Packet....................................................................................... 31 PROJECT COMPLETION Certification............................................................................ 36 VI. ACCOUNTING AND AUDIT SECTION................................................................... 37 Accounting Requirements........................................................................................ 37 State Audit ............................................................................................................... 37 Audit Checklist ......................................................................................................... 38 VII. DEFINITIONS.......................................................................................................... 39 Words and terms shown in SMALL CAPS in this procedural guide are defined beginning on page 39.
4 I. Introduction
This specified grant originated from a line item in the State of California Budget for fiscal year 2022-23. A resolution is required before a CONTRACT will be issued, and an approved APPLICATION PACKET is required before GRANT payments can be approved. The GRANT PERFORMANCE PERIOD is July 1, 2022 – June 30, 2026.
1. Costs incurred before or after the GRANT PERFORMANCE PERIOD are not eligible for reimbursement.
2. Costs incurred after the APPROPRIATION DATE but before OGALS approves the APPLICATION PACKET are eligible if they are consistent with the GRANT SCOPE approved by OGALS and are ELIGIBLE COSTS.
II. Grant Process
Grant Process Key Dates
• Grant Performance Period: July 1, 2022 – June 30, 2026 • Resolution: Submit by December 31, 2023
• Contract: Sign and return by January 31, 2024
• Projects Complete by December 31, 2025
• Project Completion Packets: Submit by: January 31, 2026 Grant Process Detail
1. Resolution: APPLICANT sends resolution to OGALS by December 31, 2023, to allow approval within the CONTRACT ENCUMBRANCE PERIOD, which ends June 30, 2024.
2. CONTRACT: OGALS sends CONTRACT to APPLICANT. APPLICANT becomes GRANTEE when CONTRACT is fully executed during CONTRACT ENCUMBRANCE PERIOD. a. The CONTRACT section includes a sample contract and the contract provisions.
b. The APPLICANT must return the CONTRACT signed by the AUTHORIZED REPRESENTATIVE to OGALS no later than January 31, 2024. The APPLICANT becomes a GRANTEE when the CONTRACT is signed by OGALS. c. OGALS returns a copy of the fully executed CONTRACT to the GRANTEE.
3. APPLICATION PACKET(s): The GRANTEE defines the SCOPE(s) and amount of grant funds needed for each PROJECT. As PROJECTS are identified, the GRANTEE submits individual APPLICATION PACKET(s) to OGALS. OGALS reviews each APPLICATION PACKET and sends a letter of approval to the GRANTEE or requests additional information.
After each PROJECT is approved by OGALS, OGALS will send a Status Report to the GRANTEE approximately every six months until OGALS receives a PROJECT COMPLETION PACKET. The GRANTEE must return the Status Report within thirty 5 (30) days from receipt. Payment requests will not be processed if Status Reports are overdue.
4. Payments and end of GRANT PERFORMANCE PERIOD: GRANTEE requests payments for ELIGIBLE COSTS. OGALS recommends that GRANTEE provide all PROJECT COMPLETION PACKET(S) no later than January 31, 2026. The grant payments section provides payment request instructions and forms. a. The GRANTEE may request payments after each PROJECT is approved by OGALS. GRANT funds may only be expended on ELIGIBLE COSTS incurred within the GRANT PERFORMANCE PERIOD.
b. The GRANTEE completes PROJECT SCOPE(s) and sends PROJECT COMPLETION PACKET(s) to OGALS no later than January 31, 2026.
c. The State of California receives a high volume of payment requests at the end of the fiscal year. If the PROJECT COMPLETION PACKET is received after January 31, 2026, OGALS cannot guarantee final payment by the State Controller’s Office. If the State Controller’s Office is unable to process the payment before the end of the GRANT PERFORMANCE PERIOD, the unpaid balance of grant funds will revert to the Legislature.
d. OGALS processes the final payment request after each PROJECT is complete as documented by the GRANTEE in the PROJECT COMPLETION PACKET, and as verified by OGALS when conducting a site inspection.
5. Accounting and Audit: DPR’s Audits Office may conduct an audit. The GRANTEE is required to retain all PROJECT records for five years following receipt of the final GRANT payment. The Accounting and Audit Section provides directions and an Audit Checklist for DPR audit and accounting requirements. 6 Authorizing Resolution
GRANTEE passes one resolution approving the filing of all applications associated with the CONTRACT and forwards a copy to OGALS.
The Authorizing Resolution on the following page may be reformatted; however, the language provided in the resolution must remain unchanged.
The Authorizing Resolution serves two purposes:
1. It is how the GRANTEE’S Governing Body agrees to the terms of the CONTRACT; it provides confirmation that the GRANTEE has the funding to complete, operate and maintain PROJECTS associated with the CONTRACT.
2. It designates a position title to represent the Governing Body on all matters regarding PROJECTS associated with the CONTRACT. The incumbent in this position is referred to as the AUTHORIZED REPRESENTATIVE.
The AUTHORIZED REPRESENTATIVE can delegate signatory authority to other individuals (by position title) either in entirety or for particular documents. The delegation process requires the AUTHORIZED REPRESENTATIVE to submit a letter (on letterhead) or email to OGALS delegating authority.
7 Resolution Form
Resolution No: __________________
RESOLUTION OF THE ___________ (Title of Governing Body/City Council, Board of Supervisors) OF ___________ (City, County, or District) APPROVING APPLICATION(S) FOR SPECIFIED GRANT FUNDS from Budget Act 2022/23 (Budget line item and language)
WHEREAS, the State Department of Parks and Recreation has been delegated the responsibility by the Legislature of the State of California for the administration of a grant to the [grantee name], setting up necessary procedures governing application(s); and
WHEREAS, said procedures established by the State Department of Parks and Recreation require the applicant’s Governing Body to certify by resolution the approval of project application(s) before submission of said applications to the State; and WHEREAS, the applicant will enter into a contract with the State of California to complete project(s);
NOW, THEREFORE, BE IT RESOLVED that the ___________ (grantee’s governing body) hereby:
1. Approves the filing of project application(s) for specified grant project(s); and
2. Certifies that said applicant has or will have available, prior to commencement of project work utilizing specified grant funds, sufficient funds, including those provided by this grant, to complete the project; and
3. Certifies that the applicant has or will provide sufficient funds to operate and maintain the project(s); and
4. Certifies that the applicant has reviewed, understands, and agrees to the Provisions contained in the contract in this Procedural Guide; and
5. Delegates the authority to the ___________ (designated position, not name of person occupying position), or designee to conduct all negotiations, sign and submit all documents, including, but not limited to applications, agreements, amendments, and payment requests, which may be necessary for the completion of the project scope(s); and
6. Agrees to comply with all applicable federal, state and local laws, ordinances, rules, regulations and guidelines.
Approved and adopted the _____day of ______________, 20_______.
I, the undersigned, hereby certify that the foregoing Resolution Number_____ was duly adopted by the ___________ (grantee’s governing body) following a roll call vote:
Ayes:
Noes:
Absent: __________________________
(Clerk)
1111
8 III. APPLICATION SECTION • GRANTEE may submit multiple APPLICATION PACKETS to OGALS. • Provide the APPLICATION PACKET items in the order shown in the following checklist.
• Please number the pages.
• If a checklist item is not applicable to the PROJECT, provide a brief explanation. • If an application item is incomplete send a draft with a timeline for completion.
Application packet checklist and directions
GRANTEES must complete the checklist below and submit it with the APPLICATION PACKET.
An APPLICATION PACKET is not complete unless all items on the checklist are submitted.
Each PROJECT requires its own APPLICATION PACKET. Check if included Check if not applicable Application Item
Procedural
Guide
Page #
Check when
signed by
AUTHORIZED
REPRESENTATIVE
Application
Packet
Page #
Application Packet Checklist
Digital file name: checklist.pdf Pg. 8 Pg._____
Application
Digital file name: application.pdf Pg. 11 Pg._____
Project Scope/Cost Estimate
Digital file name: costestimate.pdf Pg. 12 Pg._____
Funding Sources Form
Digital file name: fundingsources.pdf Pg. 13
CEQA Compliance Certification
Digital file name: ceqa.pdf Pg. 14 Pg._____
Acquisition Requirements
Digital file names: acqscope.pdf & acqdocs.pdf Pg. 17 Pg._____ Land Tenure documentation
Digital file names: ownership.pdf or
nonownership.pdf
Pg. 9 Pg._____
Sub-Leases or Agreements
Digital file name: otheragreements.pdf Pg. 9 Pg._____
Site Plan
Digital file name: siteplan.pdf Pg. 9 Pg._____
PROJECT Location Map
Digital file name: map.pdf Pg. 9 Pg. _____
□
□ □
□ □ □
□
□ □ □
□ □ □
□ □
□ □
□ □
□ □
9 Site Plan
• Provide a drawing showing where each feature and support amenity listed in the Project Scope/Cost Estimate Form will be located.
• Include the function and approximate square footage of each room within buildings that are part of the project SCOPE, and the approximate total square footage of the buildings.
Land Tenure and Site Control
If the property is owned in fee simple by the APPLICANT, provide one of the following:
• Deed or deed recordation number
• Title report
• Tract map (if owner’s name provided)
If the property is not owned in fee simple, provide the lease, easement, joint powers agreement, etc.
Sub-leases or Agreements
Provide a list of all other leases, agreements, memoranda of understanding, etc., affecting PROJECT property or its operation and maintenance, or California Environmental Quality Act (CEQA)
The APPLICANT should check with its local city or county planning agency for CEQA compliance information.
• If CEQA is complete: provide the CEQA Compliance Certification Form and its required attachment, filed and stamped by the County Recorder. • If CEQA is not complete: provide a timeline for completion and state “completing CEQA is a Project Scope Item.”
PROJECT Location Map
Provide a map showing highway and street access to the PROJECT site. □--
□------
□------
□ ----------
□-----
10 Additional Non-Profit Requirements
Fidelity Bond (For Non-profit grantees only)
Non-profit GRANTEES must provide a copy of a current Fidelity Bond policy to their PROJECT OFFICERS before OGALS will approve any payment requests. The premium for a Fidelity Bond is an eligible cost.
A Fidelity Bond provides insurance covering fraudulent acts of GRANTEES’ employees, volunteers, officers, and directors. The GRANTEE is the insured party. DPR must be named as a Third-Party Loss Payee. OGALS address is State of California, Dept. of Parks and Recreation, P.O. Box 942896, Floor 13, Sacramento, CA 94296-0001, Attn:
Office of Grants and Local Services.
Coverage must be at least equal to the GRANT amount. Fidelity Bond insurance must be kept current for at least six months after the date of the final GRANT payment.
GRANTEES may obtain the Fidelity Bond through a general liability carrier, a major casualty insurance carrier, or a bonds specialty company. There are Fidelity Bond frequently asked questions available on the OGALS web site.
Competitive Solicitation Process (For non-profit grantees only)
1. Non-profit GRANTEE must attempt to obtain three bids for services greater than $5,000 and for construction work greater than $25,000.
2. To ensure bidders understand the required PROJECT elements, the non-profit GRANTEE provides each bidder (potential contractor) the same written invitation for bid describing the PROJECT work to be performed based on “Best Value” factors, and the required PROJECT elements based on the Project Scope/Cost Estimate Form, and concept level site plan.
3. Solicit bids by contacting at least three potential contractors or by invitation for bids advertising, or a combination of both methods.
The non-profit GRANTEE’s Board of Directors evaluates the bids to determine which contractor will provide the “best value” and will meet PROJECT requirements. “Best value” should be determined by price, quality of materials, equipment, and workmanship. The evaluation process must ensure no conflict of interest between the contractor and the non-profit GRANTEE’s Board of Directors. The non-profit GRANTEE’s Board of Directors need not necessarily accept the lowest bid, but a reasonable justification for the decision should be recorded in writing.
4. The Board of Directors selects a contractor and awards a contract.
5. For audit purposes, the GRANTEE keeps records of Steps 1 – 4 above.
Competitive Solicitation Requirement
The non-profit GRANTEE may request a waiver of the competitive solicitation process requirement. To request a waiver, the GRANTEE must send a written request to the PROJECT OFFICER assigned to the GRANT PROJECT and explain why a waiver is required. 11 State of California – The Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Project Application Form
PROJECT NAME REQUESTED GRANT AMOUNT
$
PROJECT SITE NAME and PHYSICAL ADDRESS where
PROJECT is located (including zip code)
(Use latitude and longitude if there is no street address) LAND TENURE ( all that apply)
Owned in fee simple by APPLICANT
Available (or will be available) under
a _________year lease or easement
NEAREST CROSS STREET
COUNTY OF PROJECT LOCATION
APPLICANT NAME AND MAILING ADDRESS
AUTHORIZED REPRESENTATIVE AS SHOWN IN RESOLUTION
___________________________________________________________________________________ Name (typed or printed) and Title Email address Phone
GRANT CONTACT - For administration of grant (if different from AUTHORIZED REPRESENTATIVE) ___________________________________________________________________________________ Name (typed or printed) and Title Email address Phone
GRANT SCOPE: I represent and warrant that this APPLICATION PACKET describes the intended use of the requested GRANT to complete the items listed in the attached Project Scope/Cost Estimate Form. I declare under penalty of perjury, under the laws of the State of California, that the information contained in this APPLICATION PACKET, including required attachments, is accurate. ____________________
Signature of AUTHORIZED REPRESENTATIVE as shown in Resolution Date Print Name
Title
□
□
12 Project Scope/Cost Estimate Form
GRANTEE: PROJECT Name
Grant Scope (Describe the project in 30 words or less):
GRANT SCOPE ITEMS
ACQUISITION: List each parcel number, acreage, estimated date of purchase and cost.
DEVELOPMENT: List each major project element and major support amenity. Estimated Cost $
$
$
$
$
$
$
$
$
$
$
$
$
Total GRANT amount: $
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
The APPLICANT understands that this form will be used to establish ELIGIBLE COSTS, and that all of the items listed on this form must be completed before the final PROJECT payment is processed as specified in the Final Payments section of this guide.
13 State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Funding Sources
Grantee Name:_______________________________________
Project Name:________________________________________
PROJECTs funded by the program are not complete until all SCOPE items are complete and open to the public.
If Specified GRANT funds will be used as part of the funding for a larger project, briefly describe the scope of that larger project:
The total cost of the larger project that these GRANT funds will contribute to is $____________
Anticipated completion date: _________________
List all funds that will be used:
Funding source Date Committed Amount
State of California 2022-23 Budget Act July 1, 2022 $
I represent and warrant that I have fully authority to execute this Funding Sources Form on behalf of the GRANTEE. I declare under penalty of perjury, under the laws of the State of California, that this Funding Sources Form, and any accompanying documents, for the above-mentioned grant is true and correct to the best of my knowledge.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
NOTE: Submit a revised Funding Sources Form should funding sources be modified. 14 State of California – The Resources Agency
DEPARTMENT OF PARKS AND RECREATION
CEQA Compliance Certification Form
GRANTEE:
Project Name:
Project Address:
Is CEQA complete? Yes No Is completing CEQA a PROJECT SCOPE item? Yes No What document was filed, or is expected to be filed for this project’s CEQA analysis:
__________________________________
Date complete/expected to be completed: ___________________ Notice of Exemption (attach recorded copy if filed)
Notice of Determination (attach recorded copy if filed) Other:
If CEQA is complete, and a Notice of Exemption or Notice of Determination was not filed, attach a letter from the Lead Agency explaining why, certifying the project has complied with CEQA and noting the date that the project was approved by the Lead Agency.
Lead Agency Contact Information
Agency Name:
Contact Person:
Mailing Address:
Phone: ( ) Email:
Certification:
I hereby certify that the above referenced Lead Agency has complied or will comply with the California Environmental Quality Act (CEQA) and that the project is described in adequate and sufficient detail to allow the project’s construction or acquisition.
I further certify that the CEQA analysis for this project encompasses all aspects of the work to be completed with grant funds.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
FOR OGALS USE ONLY
CEQA Document Date Received PO Initials
NOE NOD
15 Development Projects
Development Project Rules
1. Contracted work must comply with the provisions of §1771.5 of the State Labor Code.
2. GRANTEE must have adequate liability insurance, performance bond, or other security necessary to protect the State and GRANTEE’S interest against poor workmanship, fraud, or other potential loss associated with the completion of the PROJECT.
3. PROJECTS must be accessible, including an accessible path of travel to the PROJECT.
Eligible Development Costs
All costs must be incurred within the GRANT PERFORMANCE PERIOD. Costs listed below are examples of eligible costs, and not inclusive. Contact OGALS if you have any questions regarding a PROJECT cost.
Eligible Pre-construction Costs – incurred prior to groundbreaking as determined by the GRANTEE
• Public meetings, focus groups, design workshops
• Plans, specifications, construction documents, and cost estimates • Permits
• CEQA and/or environmental review
• Bid preparation and packages
• IN-HOUSE EMPLOYEE SERVICES prior to groundbreaking
• GRANT/PROJECT administration and accounting prior to groundbreaking Eligible Construction Costs – up to 100% of the PROJECT costs; incurred after groundbreaking
• Construction – necessary labor and construction activities to complete the PROJECT, including site preparation (demolition, clearing and grubbing, excavation, grading), onsite implementation and construction supervision
• Equipment – Equipment use charges (rental and in-house) must be made in accordance with GRANTEE’S normal accounting practices
• Premiums on hazard and liability insurance to cover personnel or property • Site preparation
• Purchase and installation of equipment: security cameras, lighting, signs, display boards, sound systems, video equipment, etc.
• Construction management: including site inspections and PROJECT administration • Miscellaneous: other costs incurred during the construction phase, such as transporting materials, equipment, or personnel, and communications • IN-HOUSE EMPLOYEE SERVICES after groundbreaking
• GRANT/PROJECT administration and accounting after groundbreaking Ineligible Development Costs – Cannot be charged to the grant • Furniture or equipment not site specific and not necessary for the core function of a new facility (non-capital outlay)
• Costs incurred before or after the GRANT PERFORMANCE PERIOD 16 • Indirect costs – overhead business expenses of the GRANTEE’S fixed or ordinary operating costs (rent, mortgage payments, property taxes, utilities, etc.) • Food and beverages
• Out-of-state travel
• Fundraising and grant writing
Accounting Rules for In-House Employee Services
GRANTEES must follow these accounting practices for services performed by its employees to be eligible for reimbursement:
• Maintain time and attendance records as charges are incurred, identifying the employee through a name or other tracking system, and that employee’s actual hours worked on the PROJECT.
• Time estimates, including percentages, for work performed on the PROJECT are not acceptable.
• Time sheets that do not identify the specific employee’s actual hours worked on the PROJECT are not acceptable.
• Costs of the salaries and wages must be calculated according to the GRANTEE’S wage and salary scales, and may include benefit costs such as vacation, health insurance, pension contributions and workers’ compensation. • Overtime costs may be allowed under the GRANTEE’S established policy, provided that the regular work time was devoted to the same PROJECT. • May not include overhead or cost allocation. These are the costs generally associated with supporting an employee, such as rent, personnel support, IT, utilities, etc.
• If planning to claim IN-HOUSE EMPLOYEE SERVICES costs, provide a sample timesheet for OGALS review to confirm these accounting practices are being followed.
17 Acquisition Projects and Rules
1. Purchase price cannot exceed the appraised value, even if the GRANTEE is willing to pay the difference.
2. Land cannot be acquired through eminent domain.
3. GRANTEE must provide Title Insurance.
Acquisition Grant Scope/Cost Estimate
Provide the following information on a document signed by the AUTHORIZED REPRESENTATIVE:
• A brief description, for example, “Acquisition of approximately (ENTER TOTAL ACREAGE to be acquired) for the development of [NAME] Park by (ENTER DATE no later than three years from the date final payment is issued by the SCO).” • Estimated total costs for land and relocation
• Estimated total costs other than the purchase price and relocation costs, such as appraisals, escrow fees, title insurance fees, deed restriction recordation costs Acquisition Documentation
For each parcel to be acquired, submit these documents:
1. An appraisal conducted within the last twelve months
2. A separate letter from an independent third party, AG rated appraiser certified by the California Office of Real Estate Appraisers stating the appraisal was reviewed, and was completed using acceptable methods
3. County Assessor’s parcel map, showing parcel number and parcel to be acquired
4. Estimated value of each parcel to be acquired with a description of how that value was determined (such as the listed price on MLS, in-house estimation, website evaluation, assessed value)
5. Acreage of each parcel to be acquired
For easement acquisitions, in addition to the requirements above, provide:
6. A copy of the proposed easement guaranteeing the authority to use the property for the purposes specified in the application.
For relocation costs, in addition to the requirements above, provide: A letter signed by the AUTHORIZED REPRESENTATIVE, listing the relocation costs for each displaced tenant, certifying that the relocation amount does not exceed the maximum allowed pursuant to Government Code §7260-7277.
Eligible Acquisition Costs
• IN-HOUSE EMPLOYEE SERVICES – see accounting rules
• GRANT/PROJECT administration and accounting
• Public meetings/focus groups/design workshop
• Appraisals, escrow fees, surveying, other costs associated with acquisition • Cost of land
• Surveying and/or lot line adjustments
• CEQA and/or environmental review
18 Ineligible Acquisition Costs – Cannot be charged to the grant • Acquisitions where purchase price is greater than appraised value • Costs for land acquired through eminent domain or condemnation • Costs incurred outside the GRANT performance period
• Development costs
19 IV. CONTRACT SECTION
The following section contains a sample CONTRACT, CONTRACT provisions, and a sample status report form.
State of California – The Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Grant Contract
Specified Grants
GRANTEE: Grantee
GRANT PERFORMANCE PERIOD is from July 1, 2022 through June 30, 2026 CONTRACT PERFORMANCE PERIOD is from July 1, 2022 through June 30, 2026 The GRANTEE agrees to the terms and conditions of this Contract, and the State of California, acting through its Director of Parks and Recreation, pursuant to the State of California, agrees to fund the total State grant amount indicated below.
The GRANTEE agrees to complete the PROJECT SCOPE(s) as defined in the PROJECT SCOPE /Cost Estimate Form of the application(s) filed with the State of California.
Total State grant amount not to exceed $ Grant amount
The General and Special Provisions attached are made a part of and incorporated into the Contract.
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
By______________________________________
Date____________________________________
_______________________________________________
GRANTEE
By _________________________________________
(Typed or printed name of Authorized
Representative)
________________________________________
(Signature of AUTHORIZED REPRESENTATIVE)
Title _________________________________________
Date _________________________________________
CERTIFICATION OF FUNDING (FOR STATE USE ONLY)
AMOUNT OF ESTIMATE $ CONTRACT NUMBER FUND
ADJ. INCREASING ENCUMBRANCE $ APPROPRIATION
ADJ. DECREASING ENCUMBRANCE $ ITEM VENDOR NUMBER
UNENCUMBERED BALANCE $ LINE ITEM ALLOTMENT CHAPTER STATUTE FISCAL YEAR T.B.A. NO. B.R. NO. INDEX PCA OBJ. EXPEND
I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance.
SIGNATURE OF ACCOUNTING OFFICER DATE
-
20 I. RECITALS
This AGREEMENT is entered into between the California Department of Parks and Recreation (hereinafter referred to as “GRANTOR,” “DEPARTMENT” or “STATE”) and [Name of grantee] (hereinafter referred to as “grantee”).
The DEPARTMENT hereby grants to GRANTEE a sum (also referred to as “GRANT MONIES”) not to exceed $[grant amount], subject to the terms and conditions of this AGREEMENT and the [2022- 2023 California State Budget, AB 178, Chapter 45, Statutes of 2022, as amended by AB 179, Chapter 249, Section 19.56 Item number – 3790-493-0001] (appropriation chapter and budget item number hereinafter referred to as “SPECIFIED GRANT”). These funds shall be used for completion of the GRANT SCOPE(S).
The Grant Performance Period is from July 1, 2022 to June 30, 2026.
II. GENERAL PROVISIONS
A. Definitions
As used in this CONTRACT, the following words shall have the following meanings:
1. The term “APPLICATION” means the individual project APPLICATION packet for a project pursuant to the enabling legislation and/or grant program PROCEDURAL GUIDE requirements.
2. The term “CONTRACT PERFORMANCE PERIOD” means the duration of time during which this CONTRACT is in effect.
3. The term “DEPARTMENT” or “STATE” means the California Department of Parks and Recreation.
4. The term “DEVELOPMENT” means capital improvements to real property by means of, but not limited to, construction, expansion, and/or renovation, of permanent or fixed features of the property.
5. The term “GRANTEE” means the party described as the GRANTEE in Section I of this AGREEMENT.
6. The term “GRANT PERFORMANCE PERIOD” means the period of time during which eligible costs may be incurred by the GRANTEE and paid for by the DEPARTMENT, as specified in the fully executed CONTRACT.
7. The term “GRANT PROJECT” means all real estate, leases, subleases, buildings, and other property acquired or developed with GRANT monies.
8. The term “PROJECT SCOPE” means the items listed in the PROJECT SCOPE/Cost Estimate Form found in each of the APPLICATIONS submitted pursuant to this grant.
9. The term “PROCEDURAL GUIDE” means the document identified as the “2022-23 Procedural Guide for Specified Grants.” The PROCEDURAL GUIDE provides the procedures and policies controlling the administration of the grant.
21 B. Project Execution
1. Subject to the availability of GRANT MONIES, the STATE hereby grants to the GRANTEE a sum of money not to exceed the amount stated in Section I of this CONTRACT, in consideration of, and on condition that, the sum be expended in carrying out the purposes as set forth in the scope described in the enabling legislation and referenced in the APPLICATION, Section I of this CONTRACT, and under the terms and conditions set forth in this CONTRACT.
The GRANTEE shall assume any obligation to furnish any additional funds that may be necessary to complete the GRANT SCOPE(S).
During the CONTRACT PERFORMANCE PERIOD, the GRANTEE agrees to submit any proposed change or alteration from the original GRANT SCOPE(S) in writing to the STATE for prior approval. This applies to any and all proposed changes that will occur after STATE has approved the APPLICATION. Changes in the GRANT SCOPE(S) must first be approved in writing by the STATE.
2. The GRANTEE shall complete the GRANT SCOPE(S) in accordance with the time of the Performance Period set forth in Section I of this CONTRACT, and under the terms and conditions of this contract.
3. The GRANTEE shall comply with the California Environmental Quality Act (Public Resources Code, Section 21000, et seq., Title 14, California Code of Regulations, Section 15000 et seq.).
4. The GRANTEE shall comply with all applicable current laws and regulations affecting DEVELOPMENT projects, including, but not limited to, legal requirements for construction contracts, building codes, health and safety codes, and laws and codes pertaining to individuals with disabilities, including but not limited to the Americans with Disabilities Act of 1990 (42 U.S.C. §12101 et seq.) and the California Unruh Act (California Civil Code §51 et seq.) C. Project Costs
1. GRANTEE agrees to abide by the PROCEDURAL GUIDE.
2. GRANTEE acknowledges that STATE may make reasonable changes to its procedures as set forth in the PROCEDURAL GUIDE. If STATE makes any changes to its procedures and guidelines, STATE agrees to notify GRANTEE within a reasonable time.
D. Project Administration
1. If GRANT MONIES are advanced for DEVELOPMENT projects, the advanced funds shall be placed in an interest-bearing account until expended. Interest earned on the advanced funds shall be used on the project as approved by the STATE. If grant monies are advanced and not expended, the unused portion of the grant and any interest earned shall be returned to the STATE within 60 days after project completion or end of the GRANT PERFORMANCE PERIOD, whichever is earlier.
2. During the GRANT PERFORMANCE PERIOD, the GRANTEE shall submit written project status reports within 30 calendar days after the STATE has made a specific request. All such project status reports shall be signed and certified as complete and accurate by the authorized representative of the GRANTEE. In any event, the GRANTEE shall provide the STATE a report showing total final project expenditures within 60 days of project completion or the end of the 22 GRANT PERFORMANCE PERIOD, whichever is earlier. The GRANT PERFORMANCE PERIOD is identified in Section I of this CONTRACT.
3. The GRANTEE shall make property or facilities acquired and/or developed pursuant to this contract available for inspection upon request by the STATE.
E. Project Termination
1. Project Termination refers to the non-completion of a GRANT SCOPE. Any grant funds that have not been expended by the GRANTEE shall revert to the STATE.
2. The GRANTEE may unilaterally rescind this contract at any time prior to the commencement of the project. The commencement of the project means the date of the letter notifying GRANTEE of the award or when the funds are appropriated, whichever is later. After project commencement, this contract may be rescinded, modified or amended only by mutual CONTRACT in writing between the GRANTEE and the STATE, unless the provisions of this contract provide that mutual CONTRACT is not required.
3. Failure by the GRANTEE to comply with the terms of the (a) PROCEDURAL GUIDE, (b) any legislation applicable to the ACT, (c) this CONTRACT or any other grant contracts, specified or general, that GRANTEE has entered into with STATE or any other department, agency, commission or other subdivision of California State government, may be cause for suspension of all obligations of the STATE unless the STATE determines that such failure was due to no fault of the GRANTEE. In such case, STATE may reimburse GRANTEE for eligible costs properly incurred in performance of this CONTRACT despite non-performance of the GRANTEE. To qualify for such reimbursement, GRANTEE agrees to mitigate its losses to the best of its ability.
4. Any breach of any term, provision, obligation, or requirement of this CONTRACT by the GRANTEE shall be a default of this CONTRACT. In the case of any default by GRANTEE, STATE shall be entitled to all remedies available under law and equity, including but not limited to: a) Specific Performance; b) Return of all GRANT MONIES; c) Payment to the STATE of the fair market value of the project property or the actual sales price, whichever is higher; and d) Payment to the STATE of the costs of enforcement of this CONTRACT, including but not limited to court and arbitration costs, fees, expenses of litigation, and reasonable attorney fees.
5. The GRANTEE and the STATE agree that if the GRANT SCOPE includes DEVELOPMENT, final payment may not be made until the work described in the GRANT SCOPE is complete and the GRANT PROJECT is open to the public.
F. Budget Contingency Clause
If funding for any fiscal year is reduced or deleted by the budget act for purposes of this program, the STATE shall have the option to either cancel this contract with no liability occurring to the STATE or offer a contract amendment to GRANTEE to reflect the reduced grant amount. This Paragraph shall not require the mutual CONTRACT as addressed in Paragraph E, subsection 2 of this CONTRACT
23 G. Hold Harmless
1. The GRANTEE shall waive all claims and recourse against the STATE including the right to contribution for loss or damage to persons or property arising from, growing out of or in any way connected with or incident to this CONTRACT except claims arising from the concurrent or sole negligence of the STATE, its officers, agents, and employees.
2. The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and employees against any and all claims, demands, damages, costs, expenses or liability costs arising out of the ACQUISITION, DEVELOPMENT, construction, operation or maintenance of the property described as the project which claims, demands or causes of action arise under California Government Code Section 895.2 or otherwise except for liability arising out of the concurrent or sole negligence of the STATE, its officers, agents, or employees.
3. The GRANTEE agrees that in the event the STATE is named as codefendant under the provisions of California Government Code Section 895 et seq., the GRANTEE shall notify the STATE of such fact and shall represent the STATE in the legal action unless the STATE undertakes to represent itself as codefendant in such legal action in which event the GRANTEE agrees to pay the STATE’s litigation costs, expenses, and reasonable attorney fees.
4. The GRANTEE and the STATE agree that in the event of judgment entered against the STATE and the GRANTEE because of the concurrent negligence of the STATE and the GRANTEE, their officers, agents, or employees, an apportionment of liability to pay such judgment shall be made by a court of competent jurisdiction. Neither party shall request a jury apportionment.
5. The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and employees against any and all claims, demands, costs, expenses or liability costs arising out of legal actions pursuant to items to which the GRANTEE has certified. The GRANTEE acknowledges that it is solely responsible for compliance with items to which it has certified.
H. Financial Records
1. The GRANTEE shall maintain satisfactory financial accounts, documents, including loan documents, and all other records for the project and shall make them available to the STATE for auditing at reasonable times. The GRANTEE also agrees to retain such financial accounts, documents and records for five years following project termination or final payment.
2. The GRANTEE shall keep such records as the STATE shall prescribe, including records which fully disclose (a) the disposition of the proceeds of STATE funding assistance, (b) the total cost of the project in connection with such assistance that is given or used, (c) the amount, source and nature of that portion of the project cost supplied by other sources, and (d) any other such records that will facilitate an effective audit.
3. The GRANTEE agrees that the STATE shall have the right to inspect and make copies of any books, records or reports pertaining to this contract or matters related thereto during regular office hours. The GRANTEE shall maintain and make available for inspection by the STATE accurate records of all of its costs, disbursements and receipts with respect to its activities under this contract, and shall provide copies of all such records to STATE in its certified status reports upon request by the STATE. Such accounts, documents, and records shall be retained by the GRANTEE for at least five years following final payment.
4. The GRANTEE shall use a generally accepted accounting system. 24 I. Use of Facilities
1. The GRANTEE agrees that the GRANTEE shall operate and maintain and retain full control of the property acquired or developed with the GRANT MONIES, for the duration of the CONTRACT PERFORMANCE PERIOD.
2. The GRANTEE agrees that, during the CONTRACT PERFORMANCE PERIOD, the GRANTEE shall use the property acquired or developed with grant funds under this contract only for the purposes of this grant and no other use, sale, assignment, transfer, mortgage, or other disposition or change of the control or use of the property or of any interest in the property to one not consistent with the grant purpose shall be permitted except as authorized by the DEPARTMENT and the property shall be replaced with property of equivalent value and usefulness as determined by the STATE.
3. The property acquired or developed may be transferred or assigned to another entity only if the successor entity assumes the obligations imposed under this contract and only with the prior approval of STATE.
4. Any real Property (including any portion of it or any interest in it, including any leases) may not be used as security or collateral for any debt, loan or mitigation, without the prior written approval of the STATE, provided that such approval shall not be unreasonably withheld as long as the purposes for which the grant was awarded are maintained. Any such permission that is granted does not make STATE a guarantor or a surety for any debt, loan or mitigation, nor does it waive STATE’s rights to enforce performance under the CONTRACT.
5. All real property (including any portion or interest in it, including any leases), or rights thereto, acquired with GRANT MONIES shall be subject to an appropriate form of restrictive title, rights, or covenants approved by the STATE. If the project property is taken by use of eminent domain, GRANTEE shall reimburse STATE an amount at least equal to the amount of grant monies received from STATE or the pro-rated full market value of the real property, including improvements, at the time of sale, whichever is higher.
6. If eminent domain proceedings are initiated against GRANTEE, GRANTEE shall notify STATE within 10 days of receiving the complaint.
J. Nondiscrimination
1. The GRANTEE shall not discriminate against any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status in the administration and in the use of any property or facility developed pursuant to this contract.
2. The GRANTEE shall not discriminate against any person on the basis of residence except to the extent that reasonable differences in admission or other fees may be maintained on the basis of residence and pursuant to law.
3. All facilities shall be open to members of the public generally, except as noted under the special provisions of this project contract or under provisions of the enabling legislation and/or grant program.
25 K. Severability
If any provision of this CONTRACT or the application thereof is held invalid, that invalidity shall not affect other provisions or applications of the CONTRACT which can be given effect without the invalid provision or application, and to this end the provisions of this CONTRACT are severable.
L. Liability
1. STATE assumes no responsibility for assuring the safety or standards of construction, site improvements or programs related to the GRANT SCOPE. The STATE’S rights under this CONTRACT to review, inspect and approve the GRANT SCOPE and any final plans of implementation shall not give rise to any warranty or representation that the GRANT SCOPE and any plans or improvements are free from hazards or defects.
2. GRANTEE shall ensure that any contractor hired has adequate liability insurance, performance bond, or other security necessary to protect the GRANTEE interest and the STATE’s interest against poor workmanship, fraud, or other potential loss associated with the completion of the grant project.
M. Assignability
Without the written consent of the STATE, the GRANTEE’S interest in and control of any portion of the GRANT PROJECT and responsibilities under this CONTRACT shall not be assignable or transferable by the GRANTEE either in whole or in part.
N. Use of Grant Monies
GRANTEE shall not use any grant funds (including any portion thereof) for the purpose of making any leverage loan, pledge, promissory note or similar financial device or transaction, without: 1) the prior written approval of the STATE; and 2) any financial or legal interests created by any such leverage loan, pledge, promissory note or similar financial device or transaction in the project property shall be completely subordinated to this CONTRACT through a Subordination Agreement provided and approved by the STATE, signed by all parties involved in the transaction, and recorded in the County Records against the fee title of the project property.
O. Section Headings
The headings and captions of the various sections of this CONTRACT have been inserted only for the purpose of convenience and are not a part of this CONTRACT and shall not be deemed in any manner to modify, explain, or restrict any of the provisions of this CONTRACT P. Waiver
Any failure by a party to enforce its rights under this CONTRACT, in the event of a breach or default, shall not be construed as a waiver of said rights; and the waiver of any breach or default under this CONTRACT shall not be construed as a waiver of any subsequent breach. ---
26 III. SPECIAL PROVISIONS
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. This Executive order extends to recipients of any State Grants (Grantee). Grantees include those who have contracted or will contract to receive State grants funds. Accordingly, should the State determine that a Grantee is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide the Grantee advance written notice of such termination, allowing the Grantee at least 30 calendar days to provide a written response. Termination of any contract found to be in violation of this Executive Order shall be at the sole discretion of the State. _____________________________________
GRANTEE
By:__________________________________
Signature of Authorized Representative
Title: _________________________________
Date: _________________________________
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
By: _________________________________
Date: _________________________________
27 Status Report
To monitor progress, every six months OGALS will send Status Reports to GRANTEE to complete for each PROJECT. GRANTEE must return Status Reports to OGALS within thirty days from receipt. This requirement continues until OGALS receives GRANT COMPLETION PACKETS. Payment requests will not be processed if Status Reports are overdue. See the sample Status Report below, which is subject to change.
Status Report
Grantee:
Project Number:
Project Name:
Advances to date without documentation (attach a Grant Expenditure Form documenting expenditure of the balance, if applicable):
If a portion of the advanced funds have not been spent, and more than six months have passed since the Grantee received the advanced funds, the balance must be spent on eligible costs or returned to OGALS within 60 days from receipt of this form.
Briefly describe completed work funded by the grant since the last Status Report [DATE]:
(Continue on another sheet if needed.)
Pre-Construction/Pre-Acquisition (Planning, CEQA, etc.):
1) ___________________________________________________________________________ ___________________________________________________________________________ Acquisition and/or Construction -- and Provide photos showing work completed since [DATE] 2) ___________________________________________________________________________ ___________________________________________________________________________ Potential Obstacles Affecting Completion
3) ___________________________________________________________________________ ___________________________________________________________________________ 4) Total Funds Spent To Date Using This Grant $_____________ 5) Percentage of Project Complete:________________
6) Estimated Date of Project Completion: ___________________ 7) On Time: Yes / No If not, explain:
8) Within Budget: Yes / No If not, explain:
9) Within Scope: Yes / No If not, explain:
I represent and warrant that I have full authority to execute this Grant Progress Status Report on behalf of the Grantee. I declare under penalty of perjury, under the laws of the State of California, that this status report, and any accompanying documents, for the above-mentioned Grant is true and correct to the best of my knowledge.
__________________________ _______________________ _____________ Authorized Representative* Title Date
(*Certification to above information requires a signature by a person authorized in the resolution) 28 V. Grant Payment Section
There are three types of payments:
• Pre-construction and Construction Reimbursement payments • ADVANCE payments for construction and ACQUISITION ADVANCES into escrow • Final payments
Payment requests are processed through the State Controller’s Office and are mailed to the GRANTEE eight to ten weeks from the date the request is approved by OGALS.
OGALS will not approve payment requests that do not meet the requirements described in this GRANT ADMINISTRATION GUIDE.
OGALS may withhold payment if the GRANTEE has outstanding issues, such as:
• Breach of any other contract with OGALS
• An unresolved audit exception
• An outstanding conversion
• Park sites closed or inadequately maintained
• Overdue Project Status Reports
• Other unmet grant requirements
Payment Rules
• GRANT payments before the final payment may not exceed 80% of the PROJECT amount. 20% of the PROJECT amount is retained for the final payment as a REIMBURSEMENT. • The GRANTEE should group costs together to avoid frequent payment requests. Payment requests greater than $10,000 are encouraged.
• Complete CEQA prior to requesting any reimbursement.
• Provide a sample timesheet to the PROJECT OFFICER prior to incurring any IN-HOUSE EMPLOYEE SERVICES costs, AND if claiming such costs, provide a sample timesheet with each reimbursement payment request.
• Provide (1) a list of the bidders; (2) the recommendation and/or notice of award made by the governing board; and (3) the resulting signed contract agreement to the PROJECT OFFICER PRIOR to requesting reimbursement for costs on contracts requiring a competitive solicitation or bidding process.
• Provide construction progress photos with all construction payment requests. 29 Pre-construction Reimbursement
Payment Type When to Request Document to
Send to PROJECT OFFICER
PRE-CONSTRUCTION
REIMBURSEMENT(s)
After the CONTRACT has
been ENCUMBERED
• Payment Request Form
• Grant Expenditure Form
• Timesheet sample, if applicable
Construction Reimbursement
Advance Payments
ADVANCE payments may be requested for costs the GRANTEE will incur within the next six months.
ADVANCE funds, and any interest earned on those funds, must be spent with six months of receipt, or returned to OGALS. ADVANCE payments are made at the discretion of OGALS. OGALS considers ADVANCE payments to be a privilege and reserves the right to disapprove ADVANCE payments.
Pre-construction Advance
Payment
Type
When to Request Documents to
Send to PROJECT OFFICER
PRECONSTRUCTION
ADVANCE(s)
After the GRANT
CONTRACT has been
ENCUMBERED
• Payment Request Form
• ADVANCE justification (see below)
Construction Advance
Payment Type When to Request Documents to
Send to PROJECT OFFICER
ADVANCE(s) up
to 50% of
PROJECT
amount
After the GRANT
CONTRACT has been
ENCUMBERED, and
construction will
commence during
the next six months
• Payment Request Form
• ADVANCE justification (see below)
• Copy of signed construction contract and a
notice to proceed or IN-HOUSE EMPLOYEE
SERVICES labor schedule.
Advance Justification
An ADVANCE justification is required for an ADVANCE. It must provide the following information:
Payment Type When to Request Documents to
Send to PROJECT OFFICER
REIMBURSEMENT of
up to 80% of
PROJECT amount
before final payment
After the CONTRACT is
ENCUMBERED and the
GRANTEE incurred costs
for work related to the
GRANT SCOPE
• Payment Request Form
• Grant Expenditure Form
• Timesheet sample, if applicable
• Construction progress photos
• If payment request includes
reimbursement to contractor/service
providers, Competitive Solicitation
documentation
30 • Why an ADVANCE is needed instead of a reimbursement. • A payment schedule, with a month-by-month estimate, for up to six months, showing the anticipated amount needed, and to whom the funds will be paid (IN-HOUSE EMPLOYEE or name of contractor).
• A funding plan, indicating how the GRANTEE intends to fund the percentage of the PROJECT exceeding the 50% advance limit.
• A statement indicating the GRANTEE will put the funds into a separate, interest-bearing account.
OGALS may not approve the total amount of the requested ADVANCE payment if the requested funds will not be spent within six months from the date that the payment request is submitted by the GRANTEE.
Clearing the Advance
ADVANCES must be cleared with six months of receipt. An ADVANCE is cleared by submitting:
• A Grant Expenditure Form documenting expenditures on eligible costs equal to the ADVANCE amount plus any earned interest.
• Photos of any construction completed with the ADVANCE funds (for construction ADVANCES).
Acquisition Advance
Payment Type When to Request Documents to Send
ADVANCES up to
100% of the
acquisition amount
After the contract is
encumbered and escrow is
open
See following instructions
1. Escrow letter
2. Title report cover page
3. Payment request form
The following items are required to request an ADVANCE payment into escrow:
1. A letter on the GRANTEE’s letterhead, addressing all the following elements, and signed by the GRANTEE’s AUTHORIZED REPRESENTATIVE:
a) Name, address and telephone number of the title company or escrow holder, and the escrow account number to which the GRANT funds will be disbursed b) Copy of the property appraisal and written concurrence c) GRANT CONTRACT number and amount of GRANT funds requested d) A statement by the GRANTEE that “the preliminary title report shows that there are no liens, easements, or any other restrictions that would prevent completion of the SCOPE and fulfillment of the CONTRACT provisions.”
e) A statement by the GRANTEE that “all funds (exclusive of the GRANT funds to be provided under this agreement) needed for the completion of the acquisition of the property or properties have been secured and have been or will be deposited to escrow on or about the same date as the requested GRANT funds.” The GRANTEE is entitled to reasonably rely on the representations of the seller.
2. Cover page of the preliminary title report.
31 3. Payment Request Form: the “Send Warrant To” item 7 on the Payment Request Form must be completed using the title company’s or escrow holder’s name, mailing address, and contact person.
After approval by OGALS, the payment will be mailed by the State Controller’s Office to the designated escrow company within approximately 30 working days.
Returning Unexpended Advanced Funds or Interest
The balance of unspent GRANT funds must be returned to OGALS no later than thirty days after the end of the six-month ADVANCE period. OGALS will then return the GRANT funds to the CONTRACT balance.
OGALS cannot return interest to the CONTRACT balance.
If interest was earned on the ADVANCED funds, interest must be spent on ELIGIBLE COSTS, and the unspent GRANT funds returned to OGALS.
Subsequent Payments
Any outstanding ADVANCE payments must be cleared before any additional reimbursements or ADVANCE payments will be approved.
This requirement may be waived in cases where a PROJECT requires timely payments to contractors, and the remaining balance of unspent ADVANCED funds cannot cover the next PROJECT payment.
The following items are required to request a waiver:
1. A letter to the PROJECT OFFICER, signed by the AUTHORIZED REPRESENTATIVE explaining why the waiver is needed.
2. The majority of ADVANCED funds has been cleared.
3. A payment schedule with month-by-month estimates detailing the anticipated amount needed including the unspent balance of previously ADVANCED funds, along with the additional requested reimbursement or ADVANCE.
Final Payments / Project Completion Packets
OGALS recommends all PROJECT COMPLETION PACKETS be submitted by January 31, 2026.
The final payment (20% of the PROJECT amount) will be processed after PROJECT COMPLETION and the following occurs:
1. Approval of the PROJECT COMPLETION PACKET and additional required documents in the charts below.
2. Site inspection by the PROJECT OFFICER to verify PROJECT COMPLETION.
Project Completion Packet
To request final payment and complete the PROJECT, the GRANTEE must submit the following documents:
1. Payment Request Form (pg. 33)
2. Grant Expenditure Form (pg. 35)
3. Final Funding Sources Form (if any changes from original submission) (pg. 13)
4. Project Completion Certification Form (pg. 36)
32 5. Completed CEQA, if not already provided (pg. 14)
6. Notice of Completion (optional)2
7. Audit Checklist with items marked that the GRANTEE will retain for five years following receipt of final payment (pg. 38)
For acquisition PROJECTS, the GRANTEE must submit these additional documents:
1. A copy of the recorded deed to the property
2. A map sufficient to verify the description of the property including parcel numbers and acreage
3. Copy of title insurance policy
4. Copy of title report
5. Final Escrow Closing Statement
____________________
2 OGALS recommends that the GRANTEE file a “Notice of Completion” with the County Recorder pursuant to State of California Civil Code §3093. Filing the “Notice of Completion” is not a PROJECT COMPLETION requirement. 33 Payment Request Form
See Instructions on Page 2.
1. PROJECT NUMBER
3. APPLICANT
4. PROJECT NAME
5. TYPE OF PAYMENT
State of California - Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
PAYMENT REQUEST
State Grant Programs
2. CONTRACT NUMBER
--------
D Advance D Reimbursement D Final
6. PAYMENT INFORMATION
fRound all fiaures 10 rile nearest dol/arl
a. Grant Project Amount $
b. Funds Received To Date $
C. Avc1ilc11.Jle (c1. 111i11u:; b.) $
d. Amount Of This Request sl e. Remaining Funds After This Payment (c. minus d.) $
7. SEND WARRANT TO:
AGENCY NAME
STREET ADDRESS
CITY/ST ATE/ZIP CODE
8. CERTIFICATION AND SIGNATURE OF PERSON AUTHORIZED IN RESOLUTION I
I rep,esent and warrant that I have full authority to execute this payment request on beha" of the Grantee. I declare under penalty of perjury, under the laws of the State of California, that this report, and any accompanying documents, tor the above-mentioned Grant is true and correct to the best of my knowledge.
SIGNATURE OF PERSON AUTHORIZED IN RESOLUTION ITITLE IDATE ►
FOR CALIFORNIA DEPARTMENT OF PARKS AND RECREATION USE ONLY
PAYMENT APPROVAL SIGNATURE IDATE
► OPR 212 (Rev. 3/2015)(Excel 3/3/2015)(Page 1 of 2)
34 Payment Request Form Instructions
• Visit Grant Forms (ca.gov) for current forms
• Type or print legibly all entries
• Round all amounts to the nearest whole dollar
The following instructions correspond to items on the Payment Request Form:
1. PROJECT Number - The number assigned by OGALS to this project
2. CONTRACT Number - As shown in Certification of Funding section of the CONTRACT
3. GRANTEE - GRANTEE name as shown on the CONTRACT
4. PROJECT Title - Name of the PROJECT as shown in the Application
5. Type of Payment – check appropriate box on form:
6. Payment Information
a. GRANT amount
b. Funds received to date - amount paid out from this GRANT c. Available - (a. minus b.)
d. Amount of this request
e. Remaining funds after this payment - (c. minus d.)
7. Send Warrant To - GRANTEE name, address and contact person
8. Signature of AUTHORIZED REPRESENTATIVE according to the Resolution 35 Grant Expenditure Form
PROJECT Number_______________________ GRANTEE NAME __________________________
Warrant/Check # (1) Date (2) Recipient (3) Purpose (4)
PreConstruction
Amount (5)
Construction
Amount (6)
_________________________________________________________________________
PRE-CONSTRUCTION Subtotal (5) $_____________
Construction Subtotal (6) $_____________
Grand Total (5) + (6) $_____________
List only ELIGIBLE COSTS charged to the GRANT.
Column (1) Use of electronic payment numbers/electronic funds transfer numbers in the “Warrant/Check Number” column is acceptable. Please include an “EP” next to the electronic payment numbers/electronic funds transfer numbers.
If IN-HOUSE EMPLOYEE SERVICES or GRANTEE’S own equipment was used, a work order or other tracking number can be used instead of a check/warrant number.
Column (2) Date payment was made to recipient. If IN-HOUSE EMPLOYEE SERVICES were used, the date that the work was performed may be used.
Column (3) Name of Contractor, IN-HOUSE EMPLOYEE SERVES, or other entity performing work.
Column (4) Brief description of cost, such as “design”, “permits”, “construction.” When describing such costs, such as “design”, state what the design is for, and who prepared it. For items such as “permits”, state what kind of permit(s). For items such as “construction,” state what type or portion of construction, or what was constructed. (For instance, “community center”, “walkway”, etc.) Column (5) PRE-CONSTRUCTION costs.
Column (6) DEVELOPMENT costs eligible for up to 100% of GRANT amount.
Visit Grant Forms (ca.gov) for current forms.
GRANTEES may use their own spreadsheet if it contains the required information shown above. 36 Project Completion Certification Form
Grantee: ______________________________________ Project Number: _________________ Grantee contact for audit purposes
Name: __________________________________________________________________________ Address: ________________________________________________________________________ Phone: (_____) __________________ Email: _______________________________________ Project completion – list the features and support amenities (use additional pages, if needed):
List other funds (sources and amounts) used on Project (use additional pages, if needed):
Interest earned on advanced Grant funds: $ ________________ Interest spent on eligible costs: $ ________________
Did the grantee file a “Notice of Completion” with the County Recorder? Yes __ No __ Certification:
I hereby certify that all Grant funds were expended on the above-named Project and that the Project is complete and we have made final payment for all work done.
I have read California Penal Code §118 and understand that every person who testifies, declares, deposes, or certifies under penalty of perjury and willfully states as true any material matter which he or she knows to be false, is guilty of perjury, which is a felony punishable by imprisonment in state prison for two, three, or four years.
Furthermore, I have read California Penal Code §72 and understand that every person who, with the intent to defraud, presents for allowance or for payment to any state board or officer, or to any county, city, or District board or officer, authorized to allow or pay the same if genuine, any false or fraudulent claim, bill, account, voucher, or writing, is guilty of a felony-misdemeanor punishable either by imprisonment in county jail for a period of not more than one year, by a fine not exceeding one thousand dollars, or both, or by imprisonment in state prison, by a fine not exceeding ten thousand dollars, or both.
I represent and warrant that I have full authority to execute this Project Completion Certification on behalf of the Grantee. I declare under penalty of perjury that the foregoing certification of Project Completion for the above-mentioned Grant is true and correct.
__________________________________________ ______________________________ Grantee’s Authorized Representative Title
(Printed or Typed name)
__________________________________________ ______________________________ Grantee’s Authorized Representative (Signature) Date
37 VI. ACCOUNTING AND AUDIT SECTION
Contact the DPR Audits Office for questions about the following requirements.
Accounting Requirements
GRANTEES must use accounting practices that:
• Provide accounting data that clearly records costs incurred on the PROJECT and accurately reflects fiscal transactions, with the necessary controls and safeguards. • Provide good audit trails, especially the source documents (purchase orders, receipts, progress payments, invoices, timecards, cancelled warrants, warrant numbers, etc.) specific to the PROJECT.
Accounting Rules for Employee Services (IN-HOUSE EMPLOYEE SERVICES) GRANTEES must follow these accounting practices for employee services:
• Maintain time and attendance records as charges are incurred, identifying the employee through a name or other tracking system, and that employee’s actual time spent on the PROJECT. • Time estimates for work performed on the PROJECT are not acceptable. • Time sheets that do not identify the specific employee’s time spent on the PROJECT are not acceptable.
• Costs of the salaries and wages must be calculated according to the GRANTEE’S wage and salary scales, and may include benefit costs such as “workers’ compensation.” • Overtime costs may be allowed under the GRANTEE’S established policy, provided that the regular work time was devoted to the same PROJECT.
State Audit
Grants are subject to audit by DPR (see Audit Checklist). All PROJECT records must be retained for five years after final payment was received.
The GRANTEE must provide the following when an audit date and time has been confirmed by DPR:
• All PROJECT records, including the source documents and cancelled warrants, books, papers, accounts, time sheets, or other records listed in the Audit Checklist or requested by the DPR. • An employee having knowledge of the PROJECT and its records to assist DPR’s auditor. 38 Audit Checklist
An audit of the project may be performed before or following project completion. The GRANTEE must retain and make available all project related records for five years following project termination or final payment of grant funds. Listed below are some of the items the auditor will examine during the review of your records as applicable. It is the responsibility of the GRANTEE to have these records available in a central location ready for review once an audit date and time has been confirmed. If you have any questions regarding these documents, you may contact the State Department of Parks and Recreation Audits Office.
CONTRACTS
Summary list of bidders (including individual bid
packages)
Recommendation by reviewer of bids
Awarding by governing body (minutes of the
meeting/resolution)
Construction contract agreement
CONTRACT bonds (bid, performance, payment)
CONTRACT change orders
Contractor's progress billings
Payments to contractor (cancelled checks/warrants,
bank statements and EFT receipts**)
Stop Notices (filed by sub-contractors and release if
applicable)
Liquidated damages (claimed against the contractor)
Notice of completion (recorded)
IN-HOUSE EMPLOYEE SERVICES*
Authorization/work order identifying project
Daily time sheets signed by employee and supervisor
Hourly rate (salary schedules/payroll register)
Fringe benefits (provide breakdown)
IN-HOUSE EQUIPMENT*
Authorization/work order
Daily time records identifying the project site
Hourly rate related backup documents
MINOR CONTRACTS/MATERIALS/SERVICES/EQUIPMENT
RENTALS
Purchase orders/Contracts/Service Agreements
Invoices
Payments (actual cancelled checks/warrants, bank
statements and EFT receipts **)
ACQUISITION
Appraisal Report
Did the owner accompany the appraiser?
10 year history
Statement of just compensation (signed by seller)
Statement of difference (if purchased above
appraisal)
Waiver of just compensation (if purchased below
appraisal: signed by seller)
Final Escrow Closing Statement
Cancelled checks/warrants, bank statements and EFT
receipts, [payment(s) to seller(s)]
GRANT deed (vested to the participant) or final order of condemnation
Title insurance policy (issued to participant)
Relocation documents
Income (rental, grazing, sale of improvements, etc.)
INTEREST
Schedule of interest earned on State funds advanced
Note: Interest on grant ADVANCES is accountable,
even if commingled in a pooled fund account and/or
interest was never allocated back to the grant fund.
AGREEMENT/CONTRACTS
Leases, agreements, etc., pertaining to
developed/acquired property
* Estimated time expended on the projects is not acceptable. Actual time records and all supporting documentation must be maintained as charges are incurred and made available for verification at the time of audit.
** Front and back if copied.
39 VII. DEFINITIONS
Capitalized words and terms used in this process guide are defined below.
ADVANCE – payment made to the GRANTEE for work that will occur in the future or work that has already occurred during the GRANT PERFORMANCE PERIOD and has not been paid for by the GRANTEE.
APPLICANT – an entity which does not yet have a fully-executed CONTRACT with DPR and is identified as a GRANT recipient through a legislatively specified budget line item.
APPLICATION PACKET – the Application form and its required attachments described in the Application Checklist and Directions.
APPROPRIATION DATE – July 1 of the State of California fiscal year when the funding of State budget line items is approved by the legislature. The APPROPRIATION DATE is the start of the GRANT PERFORMANCE PERIOD.
AUTHORIZED REPRESENTATIVE – the APPLICANT’S/ GRANTEE’S designated position authorized in the Resolution to sign all required GRANT documents.
CEQA – the California Environmental Quality Act as stated in the Public Resources Code §21000 et seq.; Title 14 California Code of Regulations §15000 et seq. CEQA is a law establishing policies and procedures that require entities to identify, disclose to decision makers and the public, and attempt to lessen significant impacts to environmental and historical resources that may occur as a result of the entities’ proposed PROJECT. For more information refer to https://opr.ca.gov/ceqa/
CONSTRUCTION COSTS – costs incurred starting with the date when ground-breaking construction activities such as site preparation, grading, or gutting begins, and continuing to the end of the GRANT PERFORMANCE PERIOD.
CONTRACT – an agreement between the DPR and the GRANTEE specifying the performance of the GRANT SCOPE within the GRANT PERFORMANCE PERIOD, payment of funds by DPR, and requirements for maintenance and use of the PROJECT.
CONTRACT ENCUMBRANCE PERIOD – the time starting with the APPROPRIATION DATE, when a CONTRACT must be fully executed between the GRANTEE and DPR to encumber the GRANT funds.
CONTRACT PERFORMANCE PERIOD – the period during which the grantee has obligations under the contract.
DEVELOPMENT – construction, installation, replacement, expansion, or renovation.
DPR – the California Department of Parks and Recreation.
ELIGIBLE COSTS – expenses incurred during the grant performance period to complete the SCOPE approved by OGALS through an encumbered contract.
GRANT – funds made available to a GRANTEE for completion of the PROJECT SCOPE(s) during the GRANT PERFORMANCE PERIOD.
GRANTEE – an entity having a fully executed CONTRACT with DPR.
GRANT PERFORMANCE PERIOD – period of time that ELIGIBLE COSTS may be incurred by the GRANTEE and paid for by DPR, as specified in the fully executed CONTRACT. 40 IN-HOUSE EMPLOYEE SERVICES – use of the GRANTEE’s employees working on the SCOPE.
OGALS – DPR’s Office of Grants and Local Services.
PRE-CONSTRUCTION COSTS – costs incurred during the planning, design, and permit phase of the PROJECT before construction can begin.
PROJECT – the recreation features and support amenities listed in the Project SCOPE/Cost Estimate Form.
PROJECT COMPLETION – when the features and support amenities listed in the Project SCOPE/Cost Estimate Form are complete and the facilities are open and useable by the public.
PROJECT COMPLETION PACKET – The documents required in order to request final payment following PROJECT COMPLETION
PROJECT OFFICER – an OGALS employee, who acts as a liaison with the applicants and GRANTEES, administers GRANT funds, and facilitates compliance with the Procedural Guide and CONTRACT.
SCOPE – the features and support amenities listed in the Project SCOPE/Cost Estimate Form that must be completed prior to final GRANT payment.
Resolution/Approval of Application – Magical Bridge All-Inclusive Playground Page 1 of 2 Rev: 11/22/17
RESOLUTION NO: ______
A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA
APPROVING APPLICATION(S) FOR SPECIFIED GRANT
FUNDS FROM THE BUDGET ACT OF 2022/23 CALIFORNIA
STATE BUDGET, SECTION 19.56(16)(C) $800,000 TO THE CITY OF SANTA CLARA FOR THE MAGICAL BRIDGE ALLINCLUSIVE PLAYGROUND IN CENTRAL PARK BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
WHEREAS, the State Department of Parks and Recreation has been delegated the responsibility by the Legislature of the State of California for the administration of a grant to the City of Santa Clara, setting up necessary procedures governing application(s); WHEREAS, said procedures established by the State Department of Parks and Recreation require the applicant’s Governing Body to certify by resolution the approval of project application(s) before submission of said applications to the State; and WHEREAS the applicant will enter into a contract with the State of California to complete project(s).
NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. Approves the filing of project application(s) for specified grant project(s); and
2. Certifies that said applicant has or will have available, prior to commencement of project work utilizing specified grant funds, sufficient funds, including those provided by this grant, to complete the project; and
3. Certifies that the applicant has reviewed, understands, and agrees to the General Provisions contained in the contract shown in this Procedural Guide; and
4. Delegates the authority to the City Manager, or designee to conduct all negotiations, sign and submit all documents, including, but not limited to applications, agreements, amendments, and payment requests, which may be necessary for the completion of the project scope(s); and
Resolution/Approval of Application – Magical Bridge All-Inclusive Playground Page 2 of 2 Rev: 11/22/17
5. Agrees to comply with all applicable federal, state and local laws, ordinances, rules, regulations and guidelines; and
6. Approves the allocation of $800,000 to the Capital Improvement Project Budget for the Magical Bridge All-Inclusive Playground in Central Park.
7. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE ___ DAY OF _________, 2022, BY THE FOLLOWING VOTE:
AYES: COUNCILORS:
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
ATTEST: ______________________________
NORA PIMENTEL, MMC
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1277 Agenda Date: 12/6/2022
REPORT TO COUNCIL
SUBJECT
Action on a Resolution Ordering the Vacation of the Public Utility Easements, Storm Drain Easement, Wire Clearance Easement, and Water Line Easement at 2780 El Camino Real
COUNCIL PILLAR
Promote and Enhance Economic, Housing, and Transportation Development
BACKGROUND
On May 22, 2018, City Council (Agenda Item 11) approved the General Plan Amendment, Rezoning, and Vesting Tentative Subdivision Map for the Moonlite Lanes Townhomes project (Project) located at 2780 El Camino Real (Property). The Project consists of 58 townhome units on a 2.87-acre site.
DISCUSSION
Due to the redevelopment of the Property, the existing public utility easements, storm drain easement, wire clearance easement, and water line easement encumbering the Property have been relocated or determined to be excess, and these easements are no longer necessary. The owner has requested that the City vacate the subject easements to clear these unnecessary encumbrances on the Property. Any relevant facilities previously within said easements or portions to be vacated have been removed or abandoned. All departments and agencies having an interest in the easements concur that the easements are eligible to be vacated. Staff has reviewed this proposal and found that these easements are no longer necessary for public purposes and therefore recommend that they be vacated according to subsection C of California Streets and Highways Code Section 8333.
ENVIRONMENTAL REVIEW
The potential impacts of the Project are addressed in the Mitigated Negative Declaration (MND) and the Mitigation Monitoring or Reporting Program (MMRP) that were approved by City Council on May 22, 2018.
FISCAL IMPACT
There is no additional cost to the City other than staff time and expense.
COORDINATION
This report has been coordinated with the City Attorney’s Office, Silicon Valley Power, and the Water and Sewer Utilities Department.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s City of Santa Clara Page 1 of 2 Printed on 12/2/2022
powered by Legistar™
22-1277 Agenda Date: 12/6/2022
Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
1. Adopt a Resolution Ordering the Vacation of the Public Utility Easements, Storm Drain Easement, Wire Clearance Easement, and Water Line Easement at 2780 El Camino Real [APN 290-16-018 (2020-21); SC 21-0022]; and
2. Authorize the recordation of the Resolution.
Reviewed by: Craig Mobeck, Director of Public Works
Approved by: Rajeev Batra, City Manager
ATTACHMENTS
1. Resolution
City of Santa Clara Page 2 of 2 Printed on 12/2/2022
powered by Legistar™
Resolution ordering the Vacation of Easements Page 1 of 3 Rev. 11/22/17; Typed:03-11-2022 SC21-0022
RECORD WITHOUT FEE PURSUANT
TO GOV’T CODE SECTION 6103
Recording Requested by:
Office of the City Attorney
City of Santa Clara, California
When Recorded, Mail to:
Office of the City Clerk
City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
Form per Gov’t Code Section 27361.6 [SPACE ABOVE THIS LINE FOR RECORDER’S USE] RESOLUTION NO. __________
A RESOLUTION OF THE CITY OF SANTA CLARA,
CALIFORNIA, ORDERING THE VACATION OF THE
PUBLIC UTILITY EASEMENTS, STORM DRAIN
EASEMENT, WIRE CLEARANCE EASEMENT AND WATER
LINE EASEMENT AT 2780 EL CAMINO REAL [APN 290-16-
018 (2020-21)]
BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
WHEREAS, the City of Santa Clara currently possesses the Public Utility Easement described in Exhibit A and shown on Exhibit B, the Public Utility Easement described in Exhibit C and shown on Exhibit D, the Storm Drain Easement described in Exhibit E and shown on Exhibit F, the Wire Clearance Easement described in Exhibit G and shown on Exhibit H, the Water Line Easement described in Exhibit I and shown on Exhibit J, which Exhibits are incorporated herein by reference. Said Easements were dedicated by those certain documents as mentioned in said Exhibits; and,
WHEREAS, pursuant to Section 8333 of the California Streets and Highways Code, the City Council “may summarily vacate a public service easement” in any of the following cases:
(a) The easement has not been used for the purpose for which it was dedicated or acquired for five consecutive years immediately preceding the proposed vacation.
Resolution ordering the Vacation of Easements Page 2 of 3 Rev. 11/22/17; Typed:03-11-2022 SC21-0022
(b) The date of dedication or acquisition is less than five years, and more than one year, immediately preceding the proposed vacation, and the easement was not used continuously since that date.
(c) The easement has been superseded by relocation, or determined to be excess by the easement holder, and there are no other public facilities located within the easement.
NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. That said Easements shown in said Exhibits have been superseded by relocation, or determined to be excess by the easement holders, and there are no other public facilities located within the easements.
2. That said Easements described and shown in said Exhibits in the City are hereby vacated pursuant to California Streets and Highways Code Section 8333.
3. That the vacation hereby releases all easement rights and interest of the City referred in said Exhibits to the current property owner(s).
///
///
///
///
///
///
///
///
///
///
///
///
Resolution ordering the Vacation of Easements Page 3 of 3 Rev. 11/22/17; Typed:03-11-2022 SC21-0022
4. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE ___ DAY OF _________, 2022, BY THE FOLLOWING VOTE:
AYES: COUNCILORS:
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
ATTEST: __________________________
NORA PIMENTEL, MMC
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
Attachments incorporated by reference:
1. Exhibits A, B, C, D, E, F, G, H, I and J
K:\Engineering\Engineering\5-LPD\DOC\SC21-0022 Res vac easements.doc SC20 XXX
1 OF 1
Civil Engineers • Planners • Surveyors
2055 GATEWAY PLACE
Suite 550
San Jose, CA 95110
Phone: (408) 453-1066
Fax: (408) 453-1060
NOVEMBER 3, 2021 JOB NO. 14-130
EXHIBIT “A”
LEGAL DESCRIPTION
VACATION OF PUBLIC UTILITY EASEMENT (PUE)
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SANTA CLARA, COUNTY OF SANTA CLARA, STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:
BEING ALL OF THE EXISTING 5’ WIDE PUBLIC UTILITY EASEMENT OVER PARCEL 1 AS SHOWN ON THAT CERTAIN PARCEL MAP RECORDED JUNE 19, 1979 IN BOOK 444 OF MAPS AT PAGES 1-2, RECORDS OF SAID SANTA CLARA COUNTY;
A PLAT ENTITLED EXHIBIT “B” IS ATTACHED HERETO AND MADE A PART HEREOF.
THIS DESCRIPTION AND THE ACCOMPANYING PLAT WERE PREPARED BY ME OR PREPARED UNDER MY DIRECTION.
___________________________ ________________
ANDREW TURNER DATE
P.L.S. 9104
CIVIL ENGINEERING ASSOCIATES, INC.
11/04/2021
Civil
Engineering
Associates
SC21-0022
EXHIBIT "B"
VACATION OF PUBLIC UTILITY EASEMENT (PUE)
• •
11/04/2021
N
0 N
,.,,.,
0 >
0 :z
O>
3:
--0
w
::,
CL
:z
0 F
<t'.
(_)
<t'.
>
f-
:z
w
::::;;
w
Vl
<t'.
w
0 n
:;;::
5' PUE
444 M 1-2
BEING VACATED
5' PUE
444 M 1-2
BEING VACATED
11 11
I I
I I
I I
I I
I I
I I I I II ....._ ___ _
LOT G
I I I
I
LOT 6
LOT F
LOT 5
LOT E TEACT 'JOS'J3
t--+-----932 M 42~48
I I
I I
I I
I I
I I
LOT 4
LOT D
LOT 3
LOT I
LOT C
LOT 2
LOT B
LOT 1
LOT A
A7il Y BO(JLEI/ARiJ
(PUBLIC STREET)
NOTES
EASEMENTS BEING VACATED WERE
REFERENCED AS "TO BE VACA TED BY
SEPARATE INSTRUMENT", AS SHOWN ON THAT
CERTAIN TRACT MAP "TRACT 10513", FILED
FOR RECORD ON SEPTEMBER 10, 2020 IN
BOOK 932 OF MAPS AT PAGES 42 THROUGH
48 INCLUSIVE, RECORDS OF SANTA CLARA
COUNTY,
THERE ARE NO ELECTRICAL LINES
UNDERGROUND OR OVERHEAD WITHIN THESE
EASEMENTS BEING VACATED,
WCE DENOTES WIRE CLEARANCE EASEMENT
SURVEYOR'S STATEMENT
ANDREW TURNER, P,L,S,
DATED
LOT K
LOT J
---
I Civil Civil Engineers Planners Surveyors BY: CH
DA TE: 11/03/2021 Eng•ineer•ing 2055 Ga teway Place Suite 550 Son Jose, CA 95110
Associates T (408) 453- 1066
SCALE: 1"=80'
JOB NO. 14-130
1 OF 1
SHT.NO.
SC21-0022
SC21-0022
1 OF 2
Civil Engineers · Planners · Surveyors
2055 GATEWAY PLACE
Suite 550
San Jose, CA 95110
Phone: (408) 453-1066
Fax: (408) 453-1060
APRIL 8, 2022 JOB NO. 14-130
EXHIBIT “C”
LEGAL DESCRIPTION
VACATION OF PUBLIC UTILITY EASEMENT (PUE)
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SANTA CLARA, COUNTY OF SANTA CLARA, STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:
BEING A PORTION OF THE PUBLIC UTILITY EASEMENT AS DESCRIBED IN THAT CERTAIN DEED RECORDED SEPTEMBER 27, 1960 IN BOOK 4929 AT PAGE 698, OFFICIAL RECORDS
OF SAID SANTA CLARA COUNTY, BOTH IN THE SAME LOCATION AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF LOT A AS SHOWN ON THAT CERTAIN SUBDIVISION MAP ENTITLED “TRACT 10513” RECORDED ON SEPTEMBER 10, 2020 IN BOOK 932 OF MAPS, AT PAGES 42-48, RECORDS OF SAID SANTA CLARA COUNTY AND BEING A POINT ON THE EASTERLY BOUNDARY OF KEILY BOULEVARD (PUBLIC STREET); THENCE SOUTHERLY ALONG THE WESTERLY BOUNDARY OF SAID LOT A, SOUTH 00⁰ 33’ 20” EAST, A DISTANCE OF 5.00;
THENCE NORTH 89⁰ 50’ 54” EAST, A DISTANCE OF 311.00 FEET TO THE TRUE POINT OF BEGINNING;
THENCE NORTH 89⁰ 50’ 54” EAST, A DISTANCE OF 10.00 FEET; THENCE SOUTH 00⁰ 09’ 06” EAST, A DISTANCE OF 5.00 FEET; THENCE SOUTH 89⁰ 50’ 54” WEST, A DISTANCE OF 10.00 FEET; THENCE NORTH 00⁰ 09’ 06” WEST, A DISTANCE OF 5.00 FEET TO THE TRUE POINT OF BEGINNING.
CONTAINING 50 SQUARE FEET (0.001 ACRES) OF LAND, MORE OR LESS Civil
Engineering
Associates
PAGE 2 OF 2
BASIS OF BEARINGS: THE BEARING NORTH 0°33'20" WEST, OF THE MONUMENT LINE OF
KIELY BOULEVARD, BETWEEN TWO FOUND MONUMENTS, AS SHOWN ON THAT CERTAIN PARCEL MAP, RECORDED IN BOOK 444 OF MAPS AT PAGES 1-2, SANTA CLARA COUNTY RECORDS, WAS USED AS THE BASIS OF ALL BEARINGS SHOWN.
A PLAT ENTITLED EXHIBIT “D” IS ATTACHED HERETO AND MADE A PART HEREOF.
THIS DESCRIPTION AND THE ACCOMPANYING PLAT WERE PREPARED BY ME OR PREPARED UNDER MY DIRECTION.
___________________________ ________________
ANDREW TURNER DATE
P.L.S. 9104
CIVIL ENGINEERING ASSOCIATES, INC.
04/08/2022
EXHIBIT "D"
• •
04/08/2022
Lu
lPOB
POC
LEGEND
POC POINT OF COMMENCEMENT
TPOB TRUE POINT OF BEGINNING
LOT G
LOT 6
LOT F
LOT 5
PUE. SEE
DETAIL A SHEET 2
LOT E TRACT 10513
932 M 42~48
LOT 4
LOT D
LOT 3
LOT I
LOT C
LOT 2
LOT 8
LOT 1
LOT A
i L1 N89.26' 40"E KIEi. Y BO//LE//Al?O
NOTES
EASEMENTS BEING VACATED WERE REFERENCED
AS "TO BE VACA TED BY SEP ARA TE
INSTRUMENT", AS SHOWN ON THAT CERTAIN
TRACT MAP "TRACT 10513", FILED FOR RECORD
ON SEPTEMBER 10, 2020 IN BOOK 932 OF
MAPS AT PAGES 42 THROUGH 48 INCLUSIVE,
RECORDS OF SANTA CLARA COUNTY.
THERE ARE NO ELECTRICAL LINES
UNDERGROUND OR OVERHEAD WITHIN THESE
EASEMENTS BEING VACATED.
PUE DENOTES PUBLIC UTILITY EASEMENT
BASIS OF BEARINGS
THE BEARING OF NORTH 0·33•20" WEST OF THE
MONUMENT LINE OF KIELY BOULEVARD AS
SHOWN ON THAT CERTAIN PARCEL MAP
RECORDED IN BOOK 444 OF MAPS AT PAGES 1
AND 2, SANTA CLARA COUNTY RECORDS, AND
AS FOUND MONUMENTED, WAS TAKEN AS BASIS
OF ALL BEARINGS FOR THIS PLAT.
LOT K
SURVEYOR'S STATEMENT
THIS SITE PLAN WAS PREPARED
~ ON.
ANDREW TURNER, P.L.S.
DATED
4. 73,i 42.00' (PUBLIC SlREET) • -~----t')-- ~---....._ ________________________________ ___ Noo·33'2o"w 310.10' ___ _ ___ ~ VACATION OF PUBLIC UTILITY EASEMENT (PUE) ~
~ F-====================;;==========~
1-
z
Lu
::::E
~ 0
n
Civil Civil Engineers Planners Surveyors
Eng•ineer•ing 2055 Gateway Place Suite 550
San Jose, CA 95110
Associates r: (4oa) 453-1066
BY:
DAlE:
SCALE:
CH
4LBL2022
1·=80' 1 OF 2
SI-IT.NO. ~
~i..=================================~ JOB NO. 14-130
• •
EXHIBIT "D"
N
N 04/08/2022
0 N
c-i
~
....
a.
<
C'>
:II:
"C
d
n
I
n
0 I
N
N
0 N
Lu
::>
0..
z
0 F
< (.)
~
Iz
Lu
::::E
Lu
V)
< Lu
0 n
~ ~
LINE#
L1
L2
L3
L4
L5
L6
LINE TABLE
BEARING
soo·33'2o"E
N89.50'54"E
N89.50'54"E
soo·o9'06"E
sa9·50'54"w
Noo·o9'06"W
Civil
LENGTH
5.00'
311.00'
10.00'
5.00'
10.00'
5.00'
LEGEND
POC POINT OF COMMENCEMENT
PUE PUBLIC UTILITY EASEMENT
TPOB TRUE POINT OF BEGINNING
I
I
PORTION OF I
PUE 4929 O.R. 698 I
BEING VACA TED I L4 50± SF ----'-----...._-i 7-
LOT E
lPOB
DETAIL A
NTS
I
I
1~
J
L6
LOT 4
SURVEYOR'S STATEMENT
THIS SITE PLAN WAS PREPARED
BY ME OR UND MY D ON.
ANDREW TURNER, P.L.S.
DATED
VACATION OF PUBLIC UTILITY EASEMENT (PUE)
Civil Engineers Planners Surveyors BY: CH
Engineering 2055 Gateway Place Suite 550 DAlE: 4LBL2022 San Jose, CA 95110 1·=20· 2 OF 2 I SCALE: Associates T: (408) 453-1066 SI-IT.NO. JOB NO. 14-130
SC21-0022
1 OF 2
Civil Engineers • Planners • Surveyors
2055 GATEWAY PLACE
Suite 550
San Jose, CA 95110
Phone: (408) 453-1066
Fax: (408) 453-1060
NOVEMBER 3, 2021 JOB NO. 14-130
EXHIBIT “E”
LEGAL DESCRIPTION
VACATION OF STORM DRAIN EASEMENT (SDE)
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SANTA CLARA, COUNTY OF SANTA CLARA, STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:
BEING A PORTION OF THE EXISTING STORM DRAIN EASEMENT AS DESCRIBED IN THAT CERTAIN DEED ENTITLED “GRANT OF EASEMENT - STORM DRAIN”, RECORDED OCTOBER 04, 1961 IN BOOK 5318 AT PAGE 135, OFFICIAL RECORDS OF SAID SANTA CLARA COUNTY AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF LOT A AS SHOWN ON THAT CERTAIN SUBDIVISION MAP ENTITLED “TRACT 10513” RECORDED ON MONTH DAY, 2020 IN BOOK 932 OF MAPS AT PAGES 42-48, RECORDS OF SAID SANTA CLARA COUNTY AND BEING A POINT ON THE EASTERLY BOUNDARY OF KEILY BOULEVARD (PUBLIC STREET); THENCE EASTERLY ALONG THE NORTHERLY BOUNDARY OF SAID LOT A AND LOT 1, AS LOT 1 IS ALSO SHOWN ON SAID SUBDIVISION MAP, NORTH 87⁰ 42’ 52” EAST, A DISTANCE OF 52.23 FEET TO THE TRUE POINT OF BEGINNING;
THENCE DEPARTING FROM SAID NORTHERLY BOUNDARY OF LOT 1, SOUTH 03⁰ 33’ 20” EAST, A DISTANCE OF 170.25 FEET;
THENCE SOUTH 52⁰ 33’ 20” EAST, A DISTANCE OF 169.22 FEET TO A POINT ON THE SOUTHERLY BOUNDARY OF LOT K, AS LOT K IS ALSO SHOWN ON SAID SUBDIVISION MAP;
THENCE EASTERLY ALONG SAID SOUTHERLY BOUNDARY OF LOT K THE FOLLOWING TWO COURSES:
- NORTH 88⁰ 02’ 40” EAST, A DISTANCE OF 8.18 FEET;
- NORTH 85⁰ 41’ 36” EAST, A DISTANCE OF 7.22 FEET;
THENCE DEPARTING FROM SAID SOUTHERLY BOUNDARY OF LOT K, NORTH 52⁰ 33’ 20” WEST, A DISTANCE OF 176.37 FEET;
THENCE NORTH 03⁰ 33’ 20” WEST, A DISTANCE OF 165.47 FEET TO A POINT ON THE NORTHERLY BOUNDARY OF SAID LOT 1;
Civil
Engineering
Associates
PAGE 2 OF 2
THENCE WESTERLY ALONG SAID NORTHERLY BOUNDARY OF LOT 1, SOUTH 87⁰ 42’ 52” WEST, A DISTANCE OF 10.00 FEET TO THE TRUE POINT OF BEGINNING; CONTAINING 3,408 SQUARE FEET (0.078 ACRES) OF LAND, MORE OR LESS BASIS OF BEARINGS: THE BEARING NORTH 0°33'20" WEST, OF THE MONUMENT LINE OF
KIELY BOULEVARD, BETWEEN TWO FOUND MONUMENTS, AS SHOWN ON THAT CERTAIN PARCEL MAP, RECORDED IN BOOK 444 OF MAPS AT PAGES 1-2, SANTA CLARA COUNTY RECORDS, WAS USED AS THE BASIS OF ALL BEARINGS SHOWN.
A PLAT ENTITLED EXHIBIT “F” IS ATTACHED HERETO AND MADE A PART HEREOF.
THIS DESCRIPTION AND THE ACCOMPANYING PLAT WERE PREPARED BY ME OR PREPARED UNDER MY DIRECTION.
___________________________ ________________
ANDREW TURNER DATE
P.L.S. 9104
CIVIL ENGINEERING ASSOCIATES, INC.
11/04/2021
SC21-0022
EXHIBIT "F"
VACATION OF STORM DRAIN EASEMENT (SDE)
• •
11/04/2021
N
0 N
n
0 >
0 z
CJ">
;;:
-0
w
TPOB
POC
co
_J
LEGEND
POC POINT OF COMMENCEMENT
TPOB TRUE POINT OF BEGINNING
LOT G
LOT 6
LOT F
LOT 7
LOT 5
TRACT 'JOS'J3
1-----L_O_T_E __ g32 M 42-48
LOT 4
LOT D
LOT 3
LOT I
LOT C
LOT 2
LOT B
L7 __ _ ---
LOT A
<:
_J
;':: N w
ofw ww
w:r:
U) U)
I
,_
: N89'26'40"E A7il Y BOI/LEJ/ARf}
_73•: 42,00' (PUBLIC STREET)
NOTES
EASEMENTS BEING VACATED WERE REFERENCED
AS "TO BE VACATED BY SEPARATE
INSTRUMENT", AS SHOWN ON THAT CERTAIN
TRACT MAP "TRACT 10513", FILED FOR RECORD
ON SEPTEMBER 10, 2020 IN BOOK 932 OF
MAPS AT PAGES 42 THROUGH 48 INCLUSIVE,
RECORDS OF SANTA CLARA COUNTY,
THERE ARE NO ELECTRICAL LINES
UNDERGROUND OR OVERHEAD WITHIN THESE
EASEMENTS BEING VACATED,
SOE DENOTES STORM DRAIN EASEMENT
BASIS OF BEARINGS
THE BEARING OF NORTH 0'33'20" WEST OF THE
MONUMENT LINE OF KIELY BOULEVARD AS
SHOWN ON THAT CERTAIN PARCEL MAP
RECORDED IN BOOK 444 OF MAPS AT PAGES 1
AND 2, SANTA CLARA COUNTY RECORDS, AND
AS FOUND MONUMENTED, WAS TAKEN AS BASIS
OF ALL BEARINGS FOR THIS PLAT.
NOTE
SEE SHEET 2 FOR LINE TABLE
:::.:::: -,
LO\ ,I------ _J---t---
0 ,._j-- I
__J _J/ )- /
LOT K
SURVEYOR'S STATEMENT
ANDREW TURNER, P,L,S,
DATED
-~-----,
____ Noo·33'2o"w 310,10·_
el i------------------------------------------1
z
0 e==
F-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I
BY: CH fz
w
::::;:
w
(/)
<l'.
w
0 ,-,-,
Civil Civil Engineers Planners Surveyors
Engineering 2055 Gateway Place Su ite 550
San Jase, CA 95110
Associates T ( 408) 453- 1066
DATE: 11Lo3L2021
SCALE: 1"=80' 1 OF 2
SHT.NO.
::;;::
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~"""""!..I
JOB NO. 14-130
SC21-0022
EXHIBIT "F"
VACATION OF STORM DRAIN EASEMENT (SDE)
• •
11/04/2021
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
N
0 N
n
0 >
0 z
CJ">
;;:
-0
w
0 (fl
z
0 e==
<x:
u
<x:
>
I
fz
w
::::;:
w
(fl
<x:
w
0 I"")
::;;::
LINE TABLE
BEARING LENGTH
N87'42'52''E 52.23'
s03·33'2o"E 170.25'
S52'33'20"E 169.22'
N88'02'40"E 8.18'
N85'41'36"E 7.22'
N52'33'20"W 176.37'
N03'33'20"W 165.47'
S87'42'52"W 10.00'
/
I
f--------
0 /
_J /
~
/
/
/
/
LD __J--
DETAIL A
NTS
Civil Civil Engineers Planners Surveyors
• • 2055 Gateway Place Su ite 550 Eng1neenng San Jase, CA 95110 Associates T (408) 453- 1066
ANDREW TURNER, P.L.S.
DATED
BY: CH
DATE: 11Lo3L2021
SCALE: 1"=80' 2 OF 2
JOB NO. 14-130 SHT.NO.
SC21-0022
SC20 XXX
1 OF 1
Civil Engineers • Planners • Surveyors
2055 GATEWAY PLACE
Suite 550
San Jose, CA 95110
Phone: (408) 453-1066
Fax: (408) 453-1060
NOVEMBER 3, 2021 JOB NO. 14-130
EXHIBIT “G”
LEGAL DESCRIPTION
VACATION OF WIRE CLEARANCE EASEMENT (WCE)
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SANTA CLARA, COUNTY OF SANTA CLARA, STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:
BEING ALL OF THAT 5’ WIDE WIRE CLEARANCE EASEMENT OVER PARCEL 1 AS SHOWN ON THAT CERTAIN PARCEL MAP RECORDED JUNE 19, 1979 IN BOOK 444 OF MAPS AT PAGES 1-2, OFFICIAL RECORDS SANTA CLARA COUNTY;
A PLAT ENTITLED EXHIBIT “H” IS ATTACHED HERETO AND MADE A PART HEREOF.
THIS DESCRIPTION AND THE ACCOMPANYING PLAT WERE PREPARED BY ME OR PREPARED UNDER MY DIRECTION.
___________________________ ________________
ANDREW TURNER DATE
P.L.S. 9104
CIVIL ENGINEERING ASSOCIATES, INC.
11/04/2021
Civil
Engineering
Associates
SC21-0022
EXHIBIT "H"
VACATION OF WIRE CLEARANCE EASEMENT (WCE)
• •
11/04/2021
N
0 N
,.,-;
0 >
0 z
0,
;;::
--0
w
u
:;;::
z
0 e==
<x:
u
<x:
>
fz
w
::::;:
w
(/)
<x:
w
0 "" ::;;::
11 11
I I
11 11
11 11
11 .__ ___ _
11 LOT G
LOT 6
LOT F
LOT 5
5' WCE 11 LOT E TEACT 'JOS·J3
444 M 1-2 1---,-1.,-1 _____ 932 M 42~48
BEING VACATED [__
11 LOT 4
11 11 LOT D
11 11
11 11
LOT 3
LOT C
11 LOT 2
11 11
11 11
LOT B
LOT 1
LOT A
A7il Y BO(JLEI/ARiJ
(PUBLIC STREET)
LOT I
NOTES
EASEMENTS BEING VACATED WERE
REFERENCED AS "TO BE VACA TED BY
SEPARATE INSTRUMENT", AS SHOWN ON THAT
CERTAIN TRACT MAP "TRACT 10513", FILED
FOR RECORD ON SEPTEMBER 10, 2020 IN
BOOK 932 OF MAPS AT PAGES 42 THROUGH
48 INCLUSIVE, RECORDS OF SANTA CLARA
COUNTY.
THERE ARE NO ELECTRICAL LINES
UNDERGROUND OR OVERHEAD WITHIN THESE
EASEMENTS BEING VACATED.
WCE DENOTES WIRE CLEARANCE EASEMENT
SURVEYOR'S STATEMENT
ANDREW TURNER, P.L.S.
DATED
LOT K
I Civil Civil Engineers Planners Surveyors BY: CH
11Lo3L2021 Eng•ineer•ing 2055 Gateway Place Su ite 550
San Jase, CA 95110
Associates T (408) 453- 1066
DATE:
SCALE: 1"=80' 1 OF 1
JOB NO. 14-130 SHT.NO.
SC21-0022
SC20 XXX
1 OF 1
Civil Engineers • Planners • Surveyors
2055 GATEWAY PLACE
Suite 550
San Jose, CA 95110
Phone: (408) 453-1066
Fax: (408) 453-1060
NOVEMBER 3, 2021 JOB NO. 14-130
EXHIBIT “I”
LEGAL DESCRIPTION
VACATION OF WATER LINE EASEMENT (WLE)
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SANTA CLARA, COUNTY OF SANTA CLARA, STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:
BEING ALL OF THAT EXISTING 15’ WIDE WATER LINE EASEMENT AS DESCRIBED IN THAT CERTAIN DEED ENTITLED “GRANT OF EASEMENT WATER” RECORDED OCTOBER 29, 1968 IN BOOK 8314 AT PAGE 636, OFFICIAL RECORDS SANTA CLARA COUNTY;
A PLAT ENTITLED EXHIBIT “J” IS ATTACHED HERETO AND MADE A PART HEREOF.
THIS DESCRIPTION AND THE ACCOMPANYING PLAT WERE PREPARED BY ME OR PREPARED UNDER MY DIRECTION.
___________________________ ________________
ANDREW TURNER DATE
P.L.S. 9104
CIVIL ENGINEERING ASSOCIATES, INC.
11/04/2021
Civil
Engineering
Associates
SC21-0022
EXHIBIT "J"
VACATION OF WATER LINE EASEMENT (WLE)
• •
11/04/2021
N
0 N
n
0 >
0 z
CJ">
;;:
'"O
w
_J
:;;::
z
0 e==
<(
u
<(
>
I
fz
w
::::;:
w
(/)
<(
w
0 r<')
::;;::
LOT G
_J
LOT 6
LOT F
LOT 5
LOT E TEACT 'JOS'J3
1----------932 M 4 2~4 8
LOT 4
LOT D
LOT 3
LOT C
LOT 2
LOT B
LOT 1
LOT A
A7il Y BO(JLEI/ARiJ
(PUBLIC STREET)
LOT I
NOTES
EASEMENTS BEING VACATED WERE
REFERENCED AS "TO BE VACA TED BY
SEPARATE INSTRUMENT",AS SHOWN ON THAT
CERTAIN TRACT MAP "TRACT 10513", FILED
FOR RECORD ON SEPTEMBER 10, 2020 IN
BOOK 932 OF MAPS AT PAGES 42 THROUGH
48 INCLUSIVE, RECORDS OF SANTA CLARA
COUNTY,
THERE ARE NO ELECTRICAL LINES
UNDERGROUND OR OVERHEAD WITHIN THESE
EASEMENTS BEING VACATED,
WLE DENOTES WATER LINE EASEMENT
SURVEYOR'S STATEMENT
ANDREW TURNER, P,L,S,
DATED
LOT K
Civil Civil Engineers Planners Surveyors BY: CH
11Lo3L2021 Eng•ineer•ing 2055 Ga teway Place Su ite 550 San Jase, CA 95110
Associates T (408) 453- 1066
DATE:
SCALE: 1"=80' 1 OF 1
JOB NO. 14-130 SHT.NO.
SC21-0022
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1222 Agenda Date: 12/6/2022
REPORT TO COUNCIL
SUBJECT
Action on Addition of Three Community Development Department Positions Funded by Building Division Permit Fees and Related Budget Amendment
COUNCIL PILLARS
Deliver and Enhance High Quality Efficient Services and Infrastructure; Manage Strategically Our Workforce Capacity and Resources
BACKGROUND
The City’s Community Development Department Building Division operates as a cost recovery fee funded program with permit fees covering 100% of service delivery costs. Permit activity and accompanying revenue have both grown steadily over the past ten years. The Building Division’s budget is appropriated in its own Building Development Services Fund. The fund maintains a positive balance in order to support the delivery of services that may continue for one to three years after the collection of permit fees. This also provides some buffer to mitigate fluctuations in economic and building industry activity. The Building Division budget includes projected revenue and costs for each fiscal year including anticipated surpluses to contribute to the reserves. While the Building Division experienced a slight drop in activity in the early months of the COVID pandemic (March-May 2020), the Building Division completed FY 2020/21 with revenue greater than projected in the Division’s budget. Similarly, FY 2021/22 was completed with revenue nearly 50% greater than projected, further contributing to the growth of the Building Division fund balance. As of September 30, 2022, revenues have tracked higher than budget at approximately 35% collected.
DISCUSSION
The Building Division (Division) continues to operate at historically high levels of permit activity, which have steadily increased over the last ten years. As activity levels grow, it is necessary to gradually add staff in order to maintain a proper balance between demand for services and the City’s ability to respond to that demand. The Division revenue is affected by economic cycles and can be impacted during economic downturns. As mentioned above, the Division maintains a reserve fund to help weather such downturns. In addition, the Division employs a significant number of contract and parttime staff to respond to increases in demand while providing flexibility to reduce staffing levels if necessary.
To respond to the increased demand in services and accompanying growth in revenue, and to provide a more efficient and effective organizational structure, staff is proposing to add three new positions within the Building Division administrative support team. While the Division has increased staff in the past three to four years for the plan check and inspection teams, there has not been an accompanying increase in the administrative support team. The proposal would add the following three positions: one Customer Service Representative, one Senior Permit Technician and one City of Santa Clara Page 1 of 3 Printed on 12/2/2022
powered by Legistar™
22-1222 Agenda Date: 12/6/2022
Permit Technician. These positions would be fully funded through the Building Division fee program and not impact the City’s General Fund. The Building Division program has sufficient balance to fund the requested positions due to the sustained increase in development and permit activity as it strives to provide the highest level of customer service to our residents and the development community at large. This adjustment will provide balance to our staff given the growth in our plan review and inspection teams over the past few years.
The Customer Service Representative (CSR) is the main point of contact for all divisions within the Development Services Department. There is a constant flow of customer walk-ins, in-person over the counter appointments, and phone calls requesting information, status updates, or payment processing. The additional CSR will help provide direct, first point of contact assistance to customers.
This key position also increases efficiencies across the entire department and other stakeholders by guiding customers to the correct staff personnel. This position will help alleviate one of the largest customer complaints of being “bounced” around when attempting to reach someone with the knowledge base to answer a specific question.
The Senior Permit Technician will serve as a subject matter expert within all stages of permit application and issuance as well as provide technical support for permitting services for the Division and all the other City departments. The Senior Permit Technician will assist with project management and play a key role in the ongoing administration, maintenance and user knowledge sharing for the City’s Accela permit tracking system. Furthermore, this position will ensure that any technical issue is well documented, communicated to upper management and shared with other City staff collaboratively. There is currently no such person on staff who is devoted to these ongoing issues in a full time and permanent capacity.
The addition of a Permit Technician will help allow staff to process submittals more quickly while providing a higher level of customer interface. As the Division has implemented an all-electronic, paperless model for Building Permit submittals, a greater level of scrutiny and vetting is required to assess permit submittal packages for completeness, appropriate fees and to assign permit processing workflows. Although the Division has created excellent customer guides for the electronic submittal process, customers often require a greater level of assistance in the permitting workflow.
Adding this position to the Permit Center team will result in fewer delays and errors, quicker turnaround times, and overall improved customer service.
The addition of these three positions (Customer Service Representative, Senior Permit Technician and Permit Technician) will contribute to balancing the Building Division work volume with customer needs and expectations. By increasing the Building Division staff in this manner, the team will have a better opportunity to meet service demands in a positive, proactive manner.
ENVIRONMENTAL REVIEW
The proposed staffing changes are not a project subject to CEQA review under section 15378(b)(5) as they are organizational or administrative activities that will not result in direct or indirect physical changes to the environment.
FISCAL IMPACT
These positions will be fully funded by Building Division permit fee revenue and therefore there will be no impact to the City’s General Fund. The estimated annual cost for the Customer Service City of Santa Clara Page 2 of 3 Printed on 12/2/2022
powered by Legistar™
22-1222 Agenda Date: 12/6/2022
Representative ($161,000), Permit Technician ($175,000), and Senior Permit Technician ($179,000) totals $515,000. In FY 2022/23, a budget amendment in the Building Development Services Fee Fund is recommended to fund the positions for six months through the remainder of the fiscal year as detailed below.
Budget Amendment
FY 2022/23
Current Increase/
(Decrease)
Revised
Building Development Services
Fund (155)
Expenditures
Community Development -
Building Division
$13,576,839 $258,000 $13,834,839
Fund Balance
Unrestricted Ending Fund Balance $21,895,813 ($258,000) $21,637,813
COORDINATION
This report has been coordinated with the Human Resources Department, Finance Department and City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
1. Approve the addition of one Customer Service Representative, one Senior Permit Technician and one Permit Technician position in the Community Development Department’s Building Division; and
2. Approve the FY 2022/23 budget amendment in the Building Development Services Fund to increase the Community Development’s Building Division appropriation by $258,000 and decrease the unrestricted ending fund balance by $258,000 (five affirmative Council votes required for the use of unused balances).
Reviewed by: Andrew Crabtree, Director, Community Development Department Approved by: Rajeev Batra, City Manager
City of Santa Clara Page 3 of 3 Printed on 12/2/2022
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1091 Agenda Date: 12/6/2022
REPORT TO COUNCIL
SUBJECT
Action to Adopt a Resolution Establishing a Suicide Prevention Policy and Mental Health Promotion for the Community
COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure
BACKGROUND
Suicide is a serious public health problem that can have lasting harmful effects on individuals, families, and communities.
According to the Centers of Disease Control and Prevention, in 2020, 45,979 people died by suicide in the United States. For every suicide death, there are also:
· 4 hospitalizations for suicide attempts
· 8 emergency department visits related to suicide
· 27 self-reported suicide attempts
· 275 people who seriously considered suicide
Individuals of all races, genders, ages, and other social characteristics express, attempt or die by suicide.
The negative effect of suicide on a community goes well beyond the individual life lost. The emotional toll impacts first responders (e.g. Public Safety Dispatchers, Police Officers, Firefighters, Paramedics, etc.) as well as loved ones (e.g. family, friends, neighbors, colleagues, classmates, faith community, etc.).
In August 2010, and revised in 2011, the County of Santa Clara Behavioral Health Services Department (County) created a County Suicide Prevention Strategic Plan (The Plan). Its vision is to prevent death by suicide and create a healthier community.
DISCUSSION
The City of Santa Clara (City) shares the County’s mission of raising community awareness to the issue of death by suicide and has a desire to engage in efforts to stop it.
Suicide is complex and a difficult topic of discussion; however, it is preventable.
Resources
City of Santa Clara Page 1 of 5 Printed on 12/2/2022
powered by Legistar™
22-1091 Agenda Date: 12/6/2022
Locally and nationally, trained professionals can provide anonymous, compassionate support to individuals in mental health distress (e.g. just need to talk, mental health or substance use crisis, thoughts of suicide, etc.) over the phone, via text, and in-person as follows:
Disaster Distress Helpline, 800-985-5990
Domestic Violence Crisis Line, 800-799-7233
Emergency, 9-1-1
National Alliance on Mental Illness, 800-950-6264 or text 741741 National Suicide and Crisis Lifeline, 800-273-8255 or call 988 Mental Health and Substance Use Services, 800-704-0900
Substance Abuse and Mental Health Services Administration, 800-662-4357 Veteran’s Crisis Line, 800-273-8255
Bill Wilson Center, 408-850-6125
In many cases referrals can also be made for outpatient treatment. These services are available in multiple languages.
The County also offers several public awareness campaigns, community outreach materials, support groups, grief counseling services, and commemorative events.
In addition, in December 2019 the Police Department’s Community Response Team added two police officers trained as Crisis Intervention Specialists (CIS). The mission of CIS is to seek and support beneficial outcomes for persons with mental illness who have come to the attention of law enforcement in the areas of behavioral health and social service referrals. CIS collaborates with multiple local, community-based organizations for these purposes. At the August 30, 2022, City Council meeting, the Council unanimously approved an Agreement with the County for a pilot program to add one licensed clinician to CIS. The Police Department is working to finalize this Agreement and incorporate this new resource into our crisis response plan.
Statistics
Locally, numerous lives have been lost to suicide and many other residents have attempted suicide or expressed suicidal thoughts, making this a significant public health issue. 2018 2019 2020 2021 2022 (thru
8/25/22)
County of Santa Clara 148 169 164 154 113
City of Santa Clara 6 10 11 11 6
NOTE: Deaths with dignity, or physician-assisted deaths, are not classified as suicides by the Medical Examiner-Coroners’ Office and therefore are not included in the suicide death data provided.
Policy
Adoption of a Suicide Prevention Policy and Mental Health Promotion for the Community, to resemble the strategies aligned in The Plan, will call for the collaboration between local and regional organizations to:
· Educate employees and residents on the causes of suicide City of Santa Clara Page 2 of 5 Printed on 12/2/2022
powered by Legistar™
22-1091 Agenda Date: 12/6/2022
· Learn to identify those at risk for self-harm including verbal, behavioral and situational warning signs of psychological distress
· Bring awareness to prevention resources and intervention education · Build skills to reduce the stigma of mental illness and motivate individuals to access support · Educate individuals on how to report threats of suicide · Provide follow-up care for individuals who have attempted suicide · Promote grief support for those who have lost a loved one Implementation of the Suicide Prevention Policy and Mental Health Promotion for the Community will be led by the City’s Office of Emergency Services (OES).
While this Policy is primarily for the community, the City will offer the following to its employees to bring awareness to suicide prevention:
· For City of Santa Clara Employees
o Human Resources Department to add materials to the onboarding process for all new full-time employees that promotes healthy mental, emotional and social development.
The materials should include a resource guide of easily accessible mental health and suicide prevention resources for employees
o Human Resources Department to provide an annual communication to employees about internal resources and employee benefits (e.g. Employee Assistance Program) to work through various life challenges
o Human Resources Department to offer grief counseling to employees following the death of a colleague
o Police and Fire Departments to offer a safe, open and non-judgmental space to debrief following a natural (e.g. earthquake, flood, pandemic, etc.) or intentional or unintentional human-caused disaster (e.g. terror attack, chemical spill/explosion, public transportation accident, etc.) or critical incident (e.g. occupational safety crisis, incident involving children, threat to individual’s physical or psychological safety and well-being, etc.) and connect participants who require additional support with follow-up services o Police and Fire Departments to create or enhance Wellness Programs as staff and financial resources allow
o Police and Fire Departments to provide access to mental health clinicians with expertise in working with public safety personnel
o Public Information Officers (City Manager’s Office, Fire and Police Departments) will ensure the reporting of an attempted suicide or suicide to both the community and/or the media in a responsible manner
Meanwhile, the community benefit of the Suicide Prevention Policy and Mental Health Promotion for the Community may include:
· City Facilities
o The City will provide facilities for non-profit organization meeting use at various City of Santa Clara Page 3 of 5 Printed on 12/2/2022
powered by Legistar™
22-1091 Agenda Date: 12/6/2022
locations (e.g. park buildings, community centers, library rooms, etc.)should the organization serve the City of Santa Clara and meet the facility use requirements o All Departments will reinforce maintenance protocols to reduce access to the means of suicide (e.g. pesticides, medications, firearms, etc.)
· For Residents
o The City will create and maintain a Crisis & Suicide Prevention webpage with easily accessible list of mental health and suicide prevention resources o The City will utilize its publications (e.g. City Hall News, Inside Santa Clara) to bring awareness to Mental Health Awareness Month (May) and National Suicide Prevention Month (September)
o The Police Department will disseminate messaging on its platforms highlighting free, confidential support for individuals in distress, prevention and crisis resources (e.g.
Veterans Crisis Line, Crisis Text Line, National Suicide and Crisis Lifeline, etc.) o Bulletin boards and display cases in City facilities will be made available on occasion to highlight mental health resources
o The Parks & Recreation Department will provide information and referral services to promote a safe and healthy lifestyle, including crisis services o The Parks & Recreation Department will invite mental health providers to participate in the Senior Center’s Health & Wellness Fair and other appropriate City sponsored special events
· Coordination with Outside Agencies
o The City Manager’s Office i.e., OES will work with the County to advance the goals of The Plan
o The City will support the efforts of the Santa Clara Unified School District in the implementation of Assembly Bill 2246 and fostering safe and supportive school communities (e.g. emotional and mental wellness, bullying prevention, safe and caring schools) and helping schools respond to a death in the school community o The OES will coordinate with the County to offer free training(s) (e.g. Question, Persuade & Refer, etc.) that could be made available to the public in City facilities o The City Council will support Federal legislation aimed at increasing mental health resources, as well as awareness of these resources to prevent deaths by suicide Staff recommends the City join the other cities in the County (e.g. Campbell, Cupertino, Gilroy, Los Altos, Los Gatos, Milpitas, Morgan Hill, Mountain View, Palo Alto, San Jose, Saratoga, Sunnyvale) that have adopted suicide prevention policies, all with the support of the Suicide Prevention Policy Workgroup.
If adopted, this Policy shall remain in effect until modified by the City Council.
ENVIRONMENTAL REVIEW
This action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(4) in that it is a City of Santa Clara Page 4 of 5 Printed on 12/2/2022
powered by Legistar™
22-1091 Agenda Date: 12/6/2022
fiscal activity that does not involve any commitment to any specific project which may result in a potential significant impact on the environment.
FISCAL IMPACT
There is no direct fiscal impact to implementation of this Policy.
Development of the individual initiatives will require one-time staff efforts in multiple Departments and implementation will require on-going staff attention and periodic awareness/training.
COORDINATION
This report has been coordinated with the City Manager’s Office, the Human Resources Department, Parks and Recreation Department, Police Department, Fire Department and the City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
Adopt a Resolution Establishing a Suicide Prevention Policy and Mental Health Promotion Reviewed by: Pat Nikolai, Chief of Police
Approved by: City Manager’s Office
ATTACHMENTS
1. Suicide Prevention Strategic Plan (The Plan)
2. Resolution
City of Santa Clara Page 5 of 5 Printed on 12/2/2022
powered by Legistar™
SANTA CLARA COUNTY MENTAL HEALTH SERVICES ACT
suicide prevention strategic plan
SANTA CLARA COUNTY | SUICIDE PREVENTION INITIATIVE
SANTA CLARA COUNTY SUICIDE PREVENTION ADVISORY COMMITTEE | JUNE 2010 pe p
help
and hope
giving
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 2 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 3 of 136 This document is dedicated to Santa Clara County residents who have lost their lives to suicide, those who have experienced the tragic loss of a loved one by suicide, those who are survivors of suicide attempts, and those who may contemplate suicide now or in the future. May this document serve to inspire individuals, organizations and communities to implement strategies needed to protect our county’s greatest resource—our residents.
This work is intended to honor and memorialize all whose loss and struggle has inspired us to take action.
Santa Clara County Suicide Prevention Advisory Committee Co‐Chairs
Hon. Liz Kniss, Santa Clara County Supervisor, District 5 Victor Ojakian, Santa Clara County Mental Health Board Member Santa Clara County Board of Supervisors
Hon. Ken Yeager, District 4, President
Hon. Dave Cortese, District 3, Vice President
Hon. Donald F. Gage, District 1
Hon. George Shirakawa, District 2
Hon. Liz Kniss, District 5
County Executive
Dr. Jeffrey Smith
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 4 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 5 of 136 If you or someone you know or love is in crisis, there are services, resources and help available at Santa Clara County’s ‐
Suicide and Crisis Services (SACS) Hotline
Toll-Free
1-855-278-4204
National Suicide Prevention Lifeline
1-800-273-TALK (8255)
For Veterans
1-800-273-TALK (8255) press 1
Additional resources also are listed on the Santa Clara County’s Mental Health Department website: www.sccgov.org/spac under the Suicide Prevention and Local Resources section on the Suicide Prevention Resources page.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 6 of 136 Giving People Help and Hope
Santa Clara County Suicide Prevention Action Plan
TABLE OF CONTENTS
A Message from Supervisor Liz Kniss and Vic Ojakian,
Co‐Chairs of the Santa Clara County
Suicide Prevention Advisory Committee 9
Santa Clara County Suicide Prevention Advisory Committee Members and Staff List with Special Acknowledgements 10 Introduction 13
I. Why We Care 17
The Impact of Suicide in Santa Clara County 17
II. What We Did 21
The Committee Planning Process 21
The Planning Approach 22
Planning Steps 25
III. What We Learned 29
Language Counts 29
Local and National Suicide Data 30
Suicide by Age 31
Suicides by Lesbian, Gay, and Bisexual Individuals 32 Suicide by Race and Ethnicity 33
Suicide by Gender 33
Suicide by City 34
Suicides among Custody Populations 35
Suicides by Military Personnel—Active Duty, National Guard, Reservists and Veterans 36
Other Possible Correlations: More Data Is Needed 38 Suicide Risk and Mental Illness 41
Suicide Risk and Alcohol Consumption 43
Suicide Risk Factors and Warning Signs 44
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 7 of 136 Factors that May Protect Against Suicide 45
IV. Review and Summary of Local Needs 49
Local Needs Across the Lifespan 49
Additional Strategies: Community Education and Information 55 Additional Strategies: Communication Practices 55 Additional Strategies: Policy and Governance Advocacy 56 Additional Needs: Data Monitoring and Evaluation 57 Local Suicide Resources: A Range of Services 57 Pending and Future Additional Prevention Resources 58 What Experts Recommend 59
Best Practices – Evolving Knowledge 59
V. What We Recommend – Five Overarching
and Interconnected Prevention Strategies 63
Strategy One ‐ Implement and coordinate suicide prevention and intervention programs and services for targeted high risk populations 64
Strategy Two ‐ Implement a community education and information campaign to increase public awareness of suicide and
suicide prevention 68
Strategy Three ‐ Develop local communication “best practices” to improve media coverage and public dialogue related to suicide 72 Strategy Four ‐ Implement policy and governance advocacy to promote systems change in suicide awareness and prevention 75 Strategy Five ‐Establish a robust data collection and monitoring system to increase the scope and availability of suicide‐related data and to evaluate suicide prevention efforts 79
VI. Next Steps 85
VII. Appendix 87
Attachment 1: Suicide in Santa Clara County by Zip Code, 2000‐2006 Suicide‐Homicide Comparison Table 89
Attachment 2: Santa Clara County Community Agencies and Programs that Interface with Suicide Attempters, Victims, and Loved Ones 93
Attachment 3: Best Practices Recommendations 97
Attachment 4: Summary of Public Forum Input 103
Attachment 5: Palo Alto Unified School District Suicide Prevention and Mental Health Promotion Policy 125
Attachment 6: References 131
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 8 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 9 of 136 A Message from County Supervisor Liz Kniss and Victor Ojakian Co‐Chairs, Suicide Prevention Advisory Committee
Suicide devastates families and takes a tremendous toll within communities. Our nation loses approximately 30,000 lives to this tragedy each year. Every 16 to 18 minutes another person dies by self‐inflicted causes. In Santa Clara County, death by suicide occurs, on average, every three days.
When someone dies by suicide, the tragedy isn't limited to the loss of life and human potential.
The heartbreaking pain, intense grief and overwhelming sorrow loved ones experience are complicated by feelings of anger, shock, and second‐guessing.
The issue of suicide was brought to the forefront of our communities’ attention in 2009, prompted by the suicide of four adolescents in a less than six‐month period. With a renewed focus on coordinated and effective suicide prevention services throughout Santa Clara County, the Board of Supervisors supported development of an action based strategy through a broad‐ based group of expert‐professionals from a wide range of fields.
Vic Ojakian and I are pleased to have served as Co‐Chairs of this dynamic group of individuals and organizational representatives. Vic is a member of the Santa Clara County Mental Health Board, a former Mayor of Palo Alto and, along with his wife Mary, a national advocate for improved prevention services since they lost their son to suicide in 2004.
The Suicide Prevention Advisory Committee diligently reviewed data, listened to experts and community members, and studied best practices in prevention and response in order to formulate an action plan in Santa Clara County. We would like to extend our sincere gratitude to the individuals who served on this committee for their significant contribution to the development of this draft plan.
In addition, we thank members of the public who attended committee meetings and/or participated in the April 28, 2009, Public Forum at which the data, deliberative process and preliminary conclusions of the Suicide Prevention Advisory Committee were enriched. Our thanks go out to each and every one of you who devoted your time, energy and expertise to this critically important endeavor.
While the current plan is a working document that is subject to change as it continues to be reviewed by the community – it is nevertheless an important blueprint for next steps. I urge all Santa Clara County residents to read this plan, think about ways in which you can add to its recommendations and/or help to implement its recommendations, and become active in this vital effort to save lives.
Hon. Liz Kniss, Supervisor, District 5 Victor Ojakian Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 10 of 136
SANTA CLARA COUNTY SUICIDE PREVENTION ADVISORY COMMITTEE This broad and diverse group of individuals, representing a cross‐section of our county, dedicated six months to create this plan. The work of this committee was imbued with the passion that comes, in large part, from personal experience with the pain of suicide. More than 60% of the individuals in this committee have either lost a loved one or friend to suicide or have attempted to take their own lives but, fortunately for us, lived so they could share their knowledge and achieve our goal to reduce the number of deaths by suicide.
Members:
Jeff Arnold, M.D.
Santa Clara Valley Medical Center Emergency Room
Maryann Barry
Santa Clara County Custody Health Services
Dennis Burns
Palo Alto Police Department
Ginny Cutler
EMQFF Child and Adolescent Mobile Crisis Program
Robert (Bob) Garner
Santa Clara County
Department of Alcohol and Drug Services
Mitch Gevelber, M.D.
Santa Clara Valley Medical Center,
Adolescent Medicine
Kelly Green, Alternate
San Mateo County Transit District
Michael Haberecht, M.D., Ph.D.
Stanford Counseling and Psychological Services
Melanie Hale, M.S., LCSW
Foothill College
Tiffany Ho, M.D.
Santa Clara County
Mental Health Department
Hope Holland
Suicide Attempt Survivor / California Network of
Mental Health Clients/ Santa Clara Chapter of
National Alliance on Mental Illness
Don Johnson, Member
Mental Health Department’s Ethnic and Cultural
Community Advisory Committee
Jennifer Jones
Suicide Attempt Survivor / Santa Clara County
Mental Health Department’s Consumer Affairs
Sheila Mitchell
Santa Clara County Probation Department
Dave Newman
Law Enforcement Liaison, South County
Bernie (Deacon) Nojadera
Interfaith Advisory Committee,
Diocese of San Jose
Cary Matsuoka
Santa Clara County Superintendents’ Association
ThuHien Nguyen, Ph.D.
Santa Clara County Mental Health Department,
Mental Health Services Act
Cultural Competency Coordinator
Erin O’Brien
Association of Mental Health Contract Agencies
Joseph O’Hara, M.D.
Santa Clara County
Medical Examiner‐Coroner Office
Mary Ojakian
American Foundation for Suicide Prevention
Chris Pacheco
Council on Aging Silicon Valley
Dan Peddycord, R.N., M.P.A./H.A.
Santa Clara County Public Health Department
Hon. Joe Pirzynski, Vice Mayor
Town of Los Gatos,
Santa Clara County Cities Association
Janin Rimper
Suicide and Crisis Services Volunteer
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 11 of 136 Amari Romero‐Thomas
211 Santa Clara County, United Way Silicon Valley
Mark Simon
SamTrans, Caltrain, San Mateo County
Transportation Authority
David Sisson
Suicide Attempt Survivor/ Community Member
Wiggsy Sivertsen
San José State University
Kevin Skelly
Palo Alto Unified School District
Pamela Smith Martin
Hospital Council of Northern and Central California
Tasha Souter, M.D.
Veterans Administration Hospital, Trauma Recovery
Nicole Squires
Policy Aide to Supervisor Kniss
Eddie Subega
Santa Clara County
Suicide and Crisis Services (Hotline)
Paul Taylor, Alternate
Momentum
Kris Wang, Alternate
Santa Clara County Cities Association
Lorraine Zeller, Alternate
Survivor and Peer Mentor
Staff:
Nancy Dane Peña, Ph.D., Director, Santa Clara County Mental Health Department Elena Tindall, M.Ed., Santa Clara County Mental Health Department Prevention and Early Intervention Consultant and temporary Liaison to the State Office of Suicide Prevention Ky Le, Santa Clara County Mental Health Department Mental Health Services Act Manager Jean McCorquodale, Mental Health Department Consultant
Tracy Hern McGreevy, Photographer
And, with Special Thanks to:
IInterpret‐ for simultaneous translation
EMQ for hosting meetings
Christine Nguyen for assistance at the public forum
CTI for Suicide Prevention Website Support
MIG, Inc. for graphic design and meeting facilitation
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 12 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 13 of 136 Introduction
When someone dies by suicide, the loss of that precious human life and the loss of that person’s potential is only one of the anguishing outcomes: There can be no more heartbreaking pain than having a loved one end his or her life. Along with intense grief from the gaping hole in one’s life, there is overwhelming sorrow about the loss that is typically mixed with a surplus of other tormenting emotions.
In Santa Clara County, death by suicide is the 10th leading cause of death. Our County ranks 54th out of California’s 58 counties (with 58 being the worst) in the rate of adolescent self‐inflicted injury.1
Death by suicide occurs, on average, every three days; and there are 2 suicide attempts every day, and an estimated 14 suicidal gestures every day in Santa Clara County.
This troubling reality of suicide in Santa Clara County stands in stark contrast to our positive identity—to our sense of pride in being the largest member of the economic region called Silicon Valley, a world leader in development of new technologies and industries, where our cities are frequently ranked among the highest in the nation in overall health and safety. We pride ourselves as being civic‐minded and welcoming of all who choose Santa Clara Valley as their home; and yet, one out of every ten deaths is the result of someone taking their own life.
This plan is the effort of many who endeavor to understand the enigma of suicide in Silicon Valley and to take a stand, together as a community, to prevent it. Our belief is one death by suicide is one death too many. One person struggling with despair and the contemplation of taking his/ her own life is one person too many.
Our mission is to bring community awareness to the issue of suicide and to engage a community effort to stop it. Additionally, as we do so, we hope to enlist the public in our effort to contribute to the success of other communities that endeavor to take action to prevent suicide.
We have organized the following report so that you, the reader, will understand how we went about our planning work, what we learned about suicide as we planned, and how we arrived at the five overarching recommendations of this Plan. Those recommendations, discussed in detail in Section V. What We Recommend, focus on community‐wide education, policy development, data collection and evaluation, communication and media practices, and an array of suicide prevention programs and services. Some of the services recommended for all ages include:
Screening and referral resources in primary care and other caregiving settings Training for professionals, service providers and community members on identification and response to individuals at risk
Crisis Hotline and a single, countywide access point/telephone number Accessible, affordable and appropriate crisis, counseling and support services Mobile crisis unit
Self‐help centers in communities
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 14 of 136 Phone consultation services
Post‐incident care for individuals and families after a 5150 episode (involuntary admission to residential psychiatric care for up to 72 hours) Public recognition of individuals who connect people at risk of suicide to resources Incorporating individuals who have survived their own attempts to die by suicide and individuals who have lost a loved one to suicide in the efforts to increase awareness and prevention
The Suicide Prevention Advisory Committee is proposing broad recommendations to:
One: Implement and coordinate suicide intervention programs and services for targeted high risk populations
Two: Implement a community education and information campaign to increase public awareness of suicide and suicide prevention
Three: Develop local communication “best practices” to improve media coverage and public dialogue related to suicide
Four: Implement a policy and governance advocacy initiative to promote systems change in suicide awareness and prevention
Five: Establish a robust data collection and monitoring system to increase the scope and availability of suicide‐related data and evaluate suicide prevention efforts Each of these broad recommendations, once endorsed by the Mental Health Board and local stakeholders and approved by the Board of Supervisors, will be developed into implementation plans, including well defined deliverables with budgets and specific procurement recommendations. It is expected that a significant portion of the funding for the plan components will be funded through Mental Health Services Act (MHSA) Prevention and Early Intervention Statewide Project funds; however, it also is anticipated that funding will be sought from other community resources, insuring this is truly a community‐supported effort.
These recommendations and strategies are described in more detail beginning on page 63. In response to public feedback, this document has been designed to provide an overview in the introduction of the recommendations, followed by the details of how these recommendations were selected, and culminating in a more detailed explanation of each strategy and next steps.
The Next Steps section of this document begins on page 85.
Please join us in a community‐wide education and action campaign to reduce the unnecessary loss of life from suicides. Join us in choosing hope and action over hopelessness and inaction.
You can help by learning about warning signs, reaching out to friends and family who are in distress with encouragement and information about ways to seek help, breaking the taboo by discussing suicide, and sharing the most important assets we have as human beings: empathy, comfort, support for our fellow human beings and the knowledge and ability to act as needed.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 15 of 136 I. Why We Care
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 16 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 17 of 136 I. Why We Care
Most people are surprised to learn that every year more than one million deaths worldwide are caused by suicides; and every year there are an additional 10 to 20 million suicide attempts, often accompanied by serious injuries. Even in our own County, suicide is the leading cause of death by fatal injury.2 The numbers are truly too large for us to ignore.
While suicide is confounding, suicide is usually preventable, given the right education, services and supports. Prevention for natural disasters and communicable diseases is typically centered on risk reduction. Likewise, prevention for suicide must be centered on risk reduction through a variety of means. Suicide is most often a fatal complication of different types of mental illnesses which are treatable. Just as with diseases of the body, the earlier treatment is sought, generally the better the outcome and the lower the risk of other complications. We are inspired by the success Australia has had in reducing the number of deaths among youth ages 16‐24 by 57%3 and of the total national population by 30%4 between 1999‐2005. We know that we, too, can make a difference in reducing suicide deaths in Santa Clara County.
As we did our planning, we learned that most services focus on intervention during a crisis, such as counseling someone who talks about taking their life, rather than on true prevention and earlier intervention. Most programs that play a role in preventing suicides do so only indirectly.
As we did our research, it became clear that an effective community suicide prevention effort must consist of multiple strategies that knit together a comprehensive effort to impact suicide through broad, community‐level education, public policies, formal media communication practices, and an array of coordinated and accessible culturally and socially relevant services.
Fundamentally, the most significant prevention strategy is for a troubled person to be able to seek help and talk about how they are feeling with someone they trust. Offering this support and encouragement to get help is something we are all capable of doing. (Suicide and Crisis Services (SACS) Hotline, Toll‐Free 1‐855‐278‐4204; National Suicide Prevention Lifeline – 1‐800‐ 273‐TALK [8255]).
The Impact of Suicide in Santa Clara County
An important step in our process was
gaining an understanding about suicide in
Santa Clara County.
In 2007, the most recent year for which this
data is available, the suicide rate in Santa
Clara County was 7.8 per 100,000.5 In
contrast to the 7.8 suicide rate, the
homicide rate in the same year was 2.6 per
100,000.6 Many more people kill
themselves than are killed by others and
0 20
40 60
80 100
120
140
160
Number of
Deaths
‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07
1999 to 2007
Santa Clara County
Annual Suicides 1999 - 2007
/
/
/
- • .. .. - ..
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 18 of 136 this is consistent with national data that
show suicide is the 8th leading cause of
death in the U.S., compared to homicide
which is the 13th leading cause of death.
The 7.8 per 100,000 suicide rate equates to
140 individuals7 who lost their lives in 2007
due to their personal despair and loss of
hope. Among older people (65+ years), the
rate jumps to 14.8 per 100,000.8 Among
males, the rate soars to 18.5 per 100,000.9
In addition, over the period 1999 through
2006, there were 5,971 suicide attempts, an
average of 750 suicide attempts per year.
Most attempt survivors had used poisoning
or cutting/piercing as the means. Whites
lead in the number of attempters (3,435 or
58% of attempters), followed by Hispanics
(1,142 or 19%), and Asians (912 or 15%).
Females attempted at almost twice the rate
of males (3,925 to 2,046). Almost half of all
attempters were in the age group of 21 to 44
years old.
In Santa Clara County, the hospitalization
rate for self‐inflicted injury among children
and youth ages 5 to 20 is 30.6 per 100,000.10
This is the rate of self‐inflicted but non‐fatal
injury hospitalizations and includes suicide
attempts well as self‐mutilation. This
equates to more than 100 children and youth
each year who so seriously hurt themselves
or try to kill themselves that they require
hospitalization.
This above data alone should serve as the
community’s “wake‐up call” because we
know, too, that 30% to 40% of persons who
complete suicide have made a previous attempt. Although the majority of people who die by suicide have not tried before to take their life, nevertheless, a serious suicide attempt is a clear risk factor for suicide death.11 The risk of completed suicide is more than 100 times greater than average in the first year after an attempt—80 times greater for women, 200 times greater for men, 200 times greater for people over 45, and 300 times greater for white men over 65.12 A Closer Look at Who We Are
Santa Clara County population 1,857,621; sixth largest county in California; largest among 9 Bay Area counties 95% of the population is urban
15 cities
San Jose is the largest city: population 1,006,892; 3rd largest city in California; 10th largest city in the U.S. Santa Clara County residents are:
à 7.5% under 5 years of age,
à 16.8% 5 to 17 years,
à 64.9% 18 to 64 years,
à 10.8% 65 years and over,
à median age is 34.
à 7,000 people are homeless in Santa Clara County
Ethnicity:
à White (Non Hispanic) 38%
à Asian 31.2%
à Hispanic 26%
à Black 2.9%
à American Indian and Alaska Native .8%
à Native Hawaiian and Other Pacific Islander .4%
à Two or More Races 2.7%
à More than 100 languages and dialects are spoken
In 2007, SCC became one of only 10 counties in the U.S. where more than 50% of residents speak a language other than English at home.
A community‐wide survey of the county’s five largest
immigrant groups revealed that immigrants from China
(60%), Mexico (48.9%) and Vietnam (47.6%) were most
likely to report not enough English as a barrier to obtaining services and education.
Palo Alto e Mountain • M IJpitU
View
Lall AJtc.9' HI: • • SuMy"w~S,(s
to. A.ltlH • .. • _ • Siln )Off
cuputino• etaira
. • cam-pbe:11 .. ._
a Mont. S..-.no
• LoaGatM
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 19 of 136 II. What We Did
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 20 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 21 of 136 II. What We Did
The Committee Planning Process
The Santa Clara County Suicide Prevention Advisory Committee (SPAC) is a 36‐member, broad‐ based group of experts in the field; professionals in related fields such as educators and school administrators, law enforcement, public transportation, public officials, and many others; specialists in various age groups; mental health consumers and family members from diverse cultures and backgrounds; suicide attempt survivors; individuals surviving the death of a loved one by suicide; and concerned members of the public. More than 60% of the members have personal experience with either the loss of a loved one to suicide or as suicide attempt survivors. The personal knowledge of loss by suicide infused the committee’s efforts with a particularly deep commitment to saving lives.
The SPAC was formed as a result of a recommendation from the Mental Health Department to create a local planning group for the purpose of developing a local suicide prevention plan and the acceptance of this recommendation by the Board of Supervisors’ Health and Hospital Committee at its meeting of September 16, 2009. Already Santa Clara County, like other California counties, had contributed substantial amounts of its local MHSA Prevention and Early Intervention funding allocation to the California Department of Mental Health (DMH) to support state‐administered, statewide projects. In December 2008, the Board of Supervisors assigned $1.9 million in PEI funds to DMH annually for four years. One of these statewide projects was the development of the California Strategic Plan on Suicide Prevention. The Strategic Plan was intended to guide the development of future statewide as well as local suicide prevention efforts. Thus, with Board of Supervisors approval and under the leadership of the Health and Hospital Committee Chairperson Liz Kniss, the SPAC was established to create a local Santa Clara County suicide prevention plan.
The SPAC held its first meeting on December 9, 2009. Between December 2009 and May 2010, the committee met the second and fourth Wednesday of every month. Members of the public also attended the meetings and their participation was welcomed in all of the discussions and deliberations, including the “break‐out” sessions which followed the whole‐group dialogues and focused on needs and strategies by age categories.
On April 28, 2010, the SPAC’s findings and preliminarily selected strategies were shared more broadly with the
community at an extensively publicized and well attended Public Forum. Translators provided live translations from English into Santa Clara County’s additional four
threshold languages (Mandarin, Vietnamese, Spanish and
Tagalog) and one of the break‐out groups was conducted
entirely in Vietnamese to better insure that all who
wished to contribute were able to do so.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 22 of 136 The Mental Health Department website was an important, ongoing communication link between SPAC members, staff and the public. On the website’s Suicide Prevention page, meetings were publicized; all data and information that was shared at the SPAC meetings were available on an ongoing basis; and summaries of steps taken and preliminary decisions were presented. During the six‐month SPAC planning period, the website received a total of 4,291 visits for a combined total of 6,954 “views,” which is defined as the number of times visitors viewed particular pages.
The final plan will be forwarded to the Santa Clara County Mental Health Board in July 2010 for its review and further solicitation of public comment. It is anticipated that the plan will be submitted for review by the Board of Supervisors in August 2010. Implementation efforts will commence after formal approval by the Board of Supervisors.
The Planning Approach
The SPAC members were informed by
the California Suicide Prevention Plan
and studied both its approach and
recommendations. They also were
informed by each other and the vast
experience of the group and other
participants who came to share personal
stories and information. It was clear at
the onset of the planning process that
the work was a matter of the heart as
much as it was strictly an effort in
strategic planning. From the first
evening, members moved through the planning process in a way that honored the deep emotional impact of suicide while they absorbed data and information and brainstormed about the needs in our community. This quality within the planning group resulted in guiding values for the planning work that were arrived at from the beginning of the process.
Guiding Values
1. Suicide is a community problem. It cannot be addressed effectively by only one system or agency.
2. The plan should be informed by the people
most affected by suicide—the survivors, the
family members, the loved ones.
3. People involved in this work should feel
engaged.
4. Suicide risk factors should be considered for
every age group across the lifespan.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 23 of 136
5. The resulting plan should not duplicate existing efforts but rather leverage them.
6. The community should own this plan.
7. The work must be culturally sensitive and competent.
8. The plan and efforts must be focused on continuous process improvement.
9. It is important that the plan is informed by public input.
Planning Goals
Also, early in the process SPAC members agreed upon the following goals for the prevention plan:
1. Reduce deaths from suicide in Santa Clara County.
2. Increase awareness of why people contemplate suicide and how to access available resources.
3. Improve monitoring of suicides using clear and comprehensive data.
4. Empower people to respond to a person who is considering suicide through training and education.
Conceptual Framework
During the process of developing a planning approach, the committee members were offered a conceptual framework to assist their thinking about suicide prevention that had proven successful with the County Mental Health Department’s (MHD) public planning efforts related to the Mental Health Services Act. The approach incorporates a lifespan perspective within an adapted public health model that aligns a continuum of health needs (in this case suicide) with levels of promotion, prevention, postvention, early intervention, and intervention strategies.
The postvention strategy was added to the standard public health model to accommodate a strategy unique to suicide which is
described below.
This framework allowed the committee
and other stakeholders to consider suicide
prevention needs from multiple
perspectives—age, need and risk,
intervention strategies, and recipient or
target of the strategies discussed.
Working definitions of various types of
interventions were utilized, again drawing
from public health definitions used to
differentiate types and intensities of
Promotion
Prevention
Early Intervention
Intervention
Family
Community
Social Systems
Lifespan
Need and Risk
Public Health Model for
Suicide Prevention Planning:
Postvention
l
l~/· ...J...._______ ! \ ____j________y .
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 24 of 136 interventions. The committee also was informed that, generally speaking, strategies that are more preventive in nature are usually less expensive per individual served and can reach many more individuals than intervention strategies. By their nature, strategies that are more intervention focused serve fewer people for a higher cost per person served.
Promotion. While there is no precise, universally accepted definition of health promotion, the MHD utilizes the common characterization of promotion as “the enhancement of the capacity of individuals, families, groups or communities to strengthen or support positive emotional, cognitive and related experiences.”13 Strategies for mental health promotion are related to improving the quality of life and potential for health rather than amelioration of symptoms and deficits.
Prevention is concerned with avoiding disease, while promotion is about advancing health and well‐being. Promotion and prevention overlap and should be complementary activities. “To prevent,” of course, means “to keep something from happening.” The Institute of Medicine prevention category is divided into three classifications—universal, selective and indicated.
Universal prevention strategies address the entire population (local communities, schools, neighborhoods). In the context of mental health, selective prevention strategies target subsets of the total population that are deemed to be at risk for mental illness by virtue of their membership in a particular population segment (victims of child abuse, witnesses to traumatic events, etc.) Indicated prevention strategies are designed to prevent the onset of mental illness in individuals who do not meet diagnostic criteria for mental illness but who are showing early signs of distress (changes in thoughts, emotions or conduct).
Postvention consists of interventions after a suicide has occurred aimed at reducing the impact of suicide on surviving friends and relatives, as being exposed to the death of a loved one by suicide is itself a risk factor that greatly increases one’s risk of suicide, especially in youth. 14 Early intervention involves
identification of warning
signs for individuals at risk for
mental health problems and
intervening early to mitigate
factors that put them at
further risk for developing
mental disorders. Early
intervention can prevent
problems from worsening.
Intervention is used to
describe practices and
programs that are offered to
individuals who are
experiencing health problems
Postvention
Institute of Medicine’s Adapted Range of Interventions
Postvention
Promotion
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 25 of 136 such as mental illness, and typically is associated with “treatment” and ongoing care provided by practitioners with specialized training in treating health conditions such as mental illness, substance abuse, and physical illness.
Planning Steps
The planning team designed and facilitated the committee process in a manner that the group followed ten planning steps in preparing the plan. It was agreed that the initial phase of plan development would focus on high level
recommendations that would be further shaped into an
implementation plan once approved. The planning steps
are listed below:
1. Established plan goals
2. Identified personal values and guiding principles
3. Reviewed local, state and national data on
suicide
4. Brainstormed needs across the lifespan
5. Aligned needs by age to available data,
risk populations, and potential
strategies
6. Identified additional plan strategies
beyond those that are age and
population‐related
7. Organized recommendations into
five overarching strategies
8. Held a public forum for dialogue
and input on the committee work
9. Incorporated the public input into
the plan
10. Adopted a finalized plan for
Mental Health Board review and
Board of Supervisors approval.
\ti(MNflriN µ,n:~:..
__:-;! - ' \)i,110;.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 26 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 27 of 136 III. What We Learned
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 28 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 29 of 136 III. What We Learned
Committee members learned from members who had first‐hand experience with the tragic loss of life by suicide or attempting their own suicide that language counts.
Traditionally, our society has not encouraged open
and honest discussion about suicide and what leads
people to contemplate suicide. Moreover, cultural
norms influence how we communicate about suicide,
and these norms can lead to unintended negative
consequences. Wording can communicate our
deepest bias. People who have survived their own
suicide attempts or who are grieving the loss of a
loved one by suicide are acutely sensitive to the
judgments communicated by word choice, for
example:
People "die by suicide" not by "committing
suicide." The word commit often is associated
with crime or sin.
There is no "successful suicide" only a
“completed suicide." Success in our American
culture is an achievement to be celebrated
and applauded. Death by suicide is not a
success, it is a loss.
Language was recognized as affecting a large number
of people. Sixty percent of the committee members,
a broad cross‐section of our county, have had
personal experience with suicide and there is
probably someone in your own personal network of
family and friends who has first‐hand knowledge of
the pain of suicide—regardless of income, race, or
country of origin.
The committee adopted the language that the
developing field of suicidology is promoting and
recommending. Additional guidance and resources
are provided in the insert to the left, Language
Counts.
Language Counts
To ensure the most emotional support
possible, consider the following:
• People "die by suicide" not by
"committing suicide."
• There is no "successful suicide" only a
“completed suicide".
• There is probably someone in your own
personal network of family and friends
who has first‐hand knowledge of the
pain of suicide‐ regardless of income,
race, or country of origin.
• Suicide attempt survivors. Individuals
who have survived a prior suicide
attempt.
• Suicide survivors. Family members,
significant others, or acquaintances who
have experienced the loss of a loved one
due to suicide. Among the general public
this term is also used to mean suicide
attempt survivors.
• Suicidal act (also referred to as suicide
attempt). Potentially self‐injurious
behavior for which there is evidence that
the person probably intended to kill
himself or herself; a suicidal act may
result in death, injuries, or no injuries.
• Suicidal behavior. A spectrum of
activities related to thoughts and
behaviors that include suicidal thinking,
suicide attempts, and completed suicide.
Resources for immediate assistance for you or
someone you love who is struggling with suicide
or despair
Suicide and Crisis Services (SACS) Hotline
Toll‐Free 1‐855‐278‐4204
National Suicide Prevention Lifeline
1‐800‐273‐TALK (8255)
For Veterans
1‐800‐273‐TALK (8255) press 1
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 30 of 136 Local and National Data
It is evident that individuals or a group cannot meaningfully “fix” a problem they do not fully understand. With this understanding, the committee Co‐Chair Vic Ojakian led the group in a review of who dies by suicide, what common problems the suicide victims faced, other risk factors, and warning signs. While many of the committee members have significant experience and expertise in some aspects of suicide and with certain age or other population groups, the data review process gave everyone a similar foundation of basic knowledge. Several questions were considered as data was reviewed, including:
1. Who is dying by suicide?
2. Who is at risk of suicide?
3. What factors may contribute to suicide?
4. What are the warning signs of suicide?
5. What factors may protect against suicide?
6. What resources are available in our community to address suicide and suicide risk?
7. What do experts recommend are “best practices” in suicide prevention?
8. What are the critical needs and recommended strategies for our community? In keeping with the overall planning approach, an emphasis was placed on studying suicides and contributing factors by age groups across the lifespan. Other data provided information about suicides by gender, race and ethnicity, and various categories of high risk. While available data was limited, further collection and analysis will continue during the Plan implementation phase.
For example, it was learned that Santa Clara County was selected as one of three sites in California to participate in a California Violent Death Reporting System.15 A 2005 study of these data revealed that at least one of the following circumstances was identified in 80% of the suicides:
The most frequently noted circumstances were associated with mental health problems, especially for females and young people.
Females (22%) more often had an alcohol or drug problem than males (14%). Males were much more likely to have a job problem (10%) than were females (0%). Male suicides were twice as likely to be precipitated by intimate partner relationship problems (18%) than female suicides (9%).
Suicide victims ages 45 and older were more likely to have a physical health problem that contributed to the suicide (38%) than victims under age 45 (6%).
In addition to research and review of available data, the committee also discussed the lack of many types and categories of data that would better inform professionals as well as the public about danger signs. One of the committee’s five key recommendations supports ongoing data Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 31 of 136 collection and efforts to encourage more detailed recordkeeping, data analysis, and availability of information related to suicides.
Suicide by Age
Children and Youth. In 2005, 270 children (ages 10
through 14) in the U.S. completed suicide.16 Suicide is the fourth leading cause of death among children between the ages of 10 and 14 years.17 Between 1999 and 2007, nine 10 to 14 year olds in Santa Clara County died of suicide.18 Youth and Young Adults. In Santa Clara County, among
teenagers ages 15 through 19, suicide is the third leading cause of death.19 Santa Clara County’s 2005‐07 suicide rate average among youth ages 15 through 24 was 7.0 per 100,000.20 That is consistent with national figures, as shown in the box
on the following
page.21 For the nine year period 1999‐2007, 113 Santa
Clara County youth (15‐24 years old) died of suicide, the majority, almost 75%, were males.22
Nationally, suicide is the second leading cause of death among college students.23 College students have an
“increased incidence of depression,” according to a
study from the Suicide Prevention Resource Center.24
Another study reports that “students experience more
stress, more anxiety, and more depression than a
decade ago. Some of these increases were dramatic.
The number of students seen each year with depression
doubled, while the number of suicidal students tripled, and the number of students seen after a sexual assault
quadrupled.”25
However, while some college‐related factors may
contribute to suicidal behavior, it is important to note that same‐aged youth who are not in college are actually at a higher risk for suicide attempts than are college
students.26
Adults. The largest number of deaths by suicide occurs in the adult age group. It is also our county’s largest age group (25‐65 year olds) at 55.6% of the total population.
National Figures on Youth and Suicide
Suicide ranks as the third leading cause of
death for young people (ages 15 through
19 and 19 through 24); only accidents and
homicides occur more frequently.
Approximately 12 young people between
the ages of 15 through 24 die every day by
suicide.
Every 2 hours and 11 minutes, a person
under the age of 25 completes suicide.
Among 15 through 24 year olds, suicide
accounts for 12.3% of all deaths annually
(CDC, 2008).
In 2005, 32,637 people completed suicide.
Of these, 4,212 were completed by people
between the ages of 15 and 24.
For every completed suicide by youth, it is
estimated that 100 to 200 attempts are
made.
In 2007, 14.5% of students (grades 9‐
through 2) had seriously considered
suicide in the previous 12 months—18.7%
of female students and 10.3% of male
students (CDC, 2008).
In the past 60 years, suicide rates have
quadrupled for males 15 through 24 years
old and have doubled for females of the
same age.
Youth Suicide Fact Sheet
www.suicidology.org
Santa Clara County Suicide Deaths by Age
Total Suicide Deaths in 2007: 140
35-44
20.7%
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 32 of 136 Among that group (ages 26 through 59), the biggest number occurs in the 45 to 54 year‐old category, according to national data. This equates to 7,426 deaths or a rate per 100,000 of
17.19.27 For adults, there is a “clear and direct relationship between suicide and unemployment. At the individual level, unemployed individuals have between two and four times the suicide rate of those employed.”28 For the nine year period 1999‐2007, 810 Santa Clara County adults (25 through 64 years old) died of suicide, the majority, almost 75%, were males.29
Older Adults. National data show that the elderly comprise 12.6 percent of the population yet account for 16 percent of suicides. However, even this may not reflect the true total. Suicide by senior citizens is thought to go unrecognized more than with other age groups. For the nine year period 1999‐2007, 203 older adults (25‐64 years old) in Santa Clara County died of suicide, the majority, almost 75%, were males.30
Older white men have the highest suicide rate of all age groups. Among males, adults age 75 years and older have the highest rate of suicide (rate 37.4 per 100,000 population).31 Most elderly suicide victims are seen by their primary care provider a few weeks prior to their suicide attempt and diagnosed with their first episode of
mild to moderate depression.32
Suicides by Lesbian, Gay, Bisexual and
Transgender Individuals
The majority of research on lesbian, gay, and
bisexual people who attempted suicide concludes
that young LGBT people have a significantly
higher risk of attempting suicide than
heterosexual young people and that most
attempted suicides among LGBT people occur
during adolescence or young adulthood.33 34
Suicide attempt rates (over the course of a
person’s lifetime) range from 52.4% (9th and
12th grade) for lesbian and bisexual females to
29% for gay and bisexual (9th and 12th grade) males.35 This is in comparison with heterosexual suicide attempt rates of 4.6%, according to the National Comorbidity Survey.36 Nationally, LGB teenagers have been found to be more than three times (3.41) as likely to attempt suicide as other youth, and young men are at particular risk.37 One significant factor that may increase this risk is the stigma around LGBT identity and the fear of being “found out.” These youth experience a perceived or actual loss of a peer group or of family support resulting in social alienation from the groups that might otherwise provide protective support.
There has been a paucity of data examining the high vulnerability of LGBT youth to suicide attempts. This lack of data demonstrates the need for further assessment from both a public health and a social justice perspective. An understanding of the impact of isolation from peers
COUNTY SUICIDE DEATHS BY RACE/ ETHNICITY
Total Suicide Deaths in 2007: 140
American Indian/
White
57.1%
Hawaiian/
Pacific Islander: 0.0%
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 33 of 136 and family and the attendant shame and low self‐esteem experienced by LGBT youth also may provide insight into the risk of suicide for other groups of youth experiencing social alienation and a lack of family/community support.
Suicides by Race and Ethnicity
In the developing field of suicidology, little is known of how everyday stressors such as racism can impact a group or individuals. That said, according to the available data reviewed, suicide rates vary by race and ethnicity. In Santa Clara County, the suicide rate for Blacks/African Americans is 15.0 per 100,000, American Indians/Native Americans is 13.0 per 100,000, Whites is 10.7 per 100,000, 2 or more races is 9.3 per 100,000, Asian is 5.2 per 100,000 and Hispanic is
5.1 per 100,000.38
However, these data only provide a partial picture. The table below compares data on Santa Clara County’s racial and ethnic diversity to the percentage of total suicide deaths in Santa Clara County in 2007. While the rates of suicide are probably underreported, combined we begin to see a fuller picture of our county in relation to suicide risk.
Comparison table between racial and ethnic make‐up of Santa Clara County as a percentage of population and as a percentage of total suicide deaths39 Race and ethnicity Total percentages of Santa Clara
County population 2007
Percentages of total suicide deaths
in Santa Clara County 2007
White 47.1% 57.1%
Asian 26.9% 17.9%
Hispanic 25.4% 16.4%
Black/African American 2.6% 5%
2 or more races 2.4% 2.9%
American Indian 0.4% 0.7%
Hawaiian/Pacific Islander 0.7% 0.0%
Suicides by Gender
A woman takes her own life every 90 minutes in the U.S., but it is estimated that one woman attempts suicide every 78 seconds.
• Women attempt suicide three times as much as men.
• The higher rate of attempted suicide in women is attributed to the elevated rate of mood disorders among females, such as major depression and seasonal affective disorder.
• Although women attempt suicide more often, men complete suicide at a rate four times that of women.
• More women than men report a history of attempted suicide, with a gender ratio of 2:1. • Firearms are now the leading method of suicide in women, as well as men. • Suicide is more common among women who are single, recently separated, divorced, or widowed.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 34 of 136 • The precipitating life events for women who attempt suicide tend to be interpersonal losses or crises in significant social or family relationships.40 Suicides by City
These data are based on zip code data being correlated to city boundaries as closely as possible.
Please note that zip code and city boundaries are not always contiguous and that there may be some inaccuracies for this reason. Nevertheless, it is informative to look at suicide rates by Santa Clara County cities. This reveals that the relationship of socioeconomic status and suicide is not clear. It might be expected that structural social inequalities, which result in groups of people with poor access to resources, including social capital, would lead to higher rates of suicide, since this occurs for other indicators of poor physical and mental health. However, data reveal that the highest rates of suicide appear to be in higher income areas of the county, with the highest rates of suicide being in Palo Alto, Los Altos/Los Altos Hills, Sunnyvale and Morgan Hill; while lower rates in general are in Milpitas, Santa Clara and San Jose. However, a closer look at suicides by zip codes reveals that frequent numbers of suicides are found in both higher income areas as well as in certain lower income neighborhoods.
Please see Attachment 1 in the Appendix for numbers of suicides by zip code and a comparison of suicide deaths with homicides.
Table 1. Suicide Rates by Santa Clara County Cities, 2000 ‐ 2006 During the seven years that were reviewed, 2000 through 2006, certain zip codes more frequently had higher numbers of suicides, for example, 95086 and 95123. It is unclear, what, if any, these zip codes have in common. Would the pattern hold over a longer period of analysis? Much work remains to be done to more fully understand the dynamics of suicide.
City Population
2000 2001 2002 2003 2004 2005 2006
Total Avg.
/Yr.
Rate per
100,000
Campbell 36,984 1 2 4 4 4 1 7 23 3.28 8.5
Cupertino 55,000 4 2 1 2 2 2 4 17 2.43 4.4
Gilroy 48,448 5 5 5 2 3 4 3 27 3.86 7.97
Los Altos / Hills 36,065 1 6 4 6 2 1 8 28 4.0 11.09
Los Gatos 28,971 4 2 0 3 4 5 1 19 2.71 9.35
Milpitas 65,235 3 2 3 4 6 6 1 25 3.57 5.47
Monte Sereno 3,511 0 0 0 0 0 0 0 0 0 0
Morgan Hill 37,066 0 3 7 6 4 3 3 26 3.71 10.00
Mountain View 71,947 7 11 7 9 8 3 4 49 7.0 9.73
Palo Alto 62,108 4 10 6 6 15 8 8 57 8.14 13.1
San Jose 953,058 65 47 61 65 73 60 47 418 59.7 6.26
Santa Clara 110,700 8 6 5 6 6 5 7 43 6.14 5.55
Saratoga 30,815 3 2 3 3 9 1 0 21 3.0 9.74
Sunnyvale 133,458 13 17 16 13 18 10 10 97 13.4 10.04
Unincorporated 98,244 0 0 0 0 0 0 0 0 0 0
Total County 1,771,610 118 115 122 129 154 109 103 850 121.4 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 35 of 136 Suicides among Custody Populations
Several interesting questions are raised when reviewing data about suicides among in‐custody populations. For example, youth entering juvenile facilities are at greater risk of suicide than similar youth in the U.S. population; however, the suicide rate in U.S. juvenile facilities in 2002 was nearly equal to the rate for similar youth in the general population.
The presence of increased risk factors among juvenile justice‐involved youth can be confirmed with Santa Clara County data. Emotional problems were cited as the most significant underlying factor contributing to their delinquency by both boys and girls in custody with the Santa Clara County Probation Department. Forty percent of boys and 58% of girls in custody said “something very bad or terrifying” had happened to them. Nearly one‐quarter of all girls surveyed as they entered juvenile hall said they wished they were dead.41 Of all boys interviewed, 81% had one or more trauma factor noted, compared to 91.7% of the girls.42 Among out‐of‐custody boys on probation supervision, 95.6% had at least one trauma factor noted, while more than one‐quarter (26.7%) of boys had three or more trauma factors noted.
However, all girls reported at least one trauma factor, and 72.7% noted four or more trauma factors in their histories.43
How does this translate into suicides or attempted suicides? According to the Santa Clara County Probation Department’s Institution Incident Report database, which was first implemented in September 2004, there have been no deaths by suicide during the period since then among youth in custody. The decrease in suicide attempts is attributed to changes made in overall custody program and protocol, as well as changes made to the suicide risk protocol and response by the Mental Health staff in the Hall. Mental Health staff and Probation Juvenile Hall staff have received more training in trauma‐informed care and all staff members are involved in increased care coordination for youth considered at risk.
Suicide attempts by youth in custody were as follows:44 Youth in Santa Clara County Probation Department Custody Year Number of Attempted Suicides
2004 7
2005 39
2006 11
2007 5
2008 0
2009 3
Total 65
Nationally, the suicide rate in jails has decreased 70% from 1983 to 2003 and has decreased 50% in prisons over the same time period. In 2002 the suicide rate in local jails (47 per 100,000 inmates) was more than three times the rate in State prisons (14 per 100,000 inmates).45 However, the suicide rate in both settings remains high.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 36 of 136 In California, between 2001 and 2006, there were
190 suicides by inmates in California. This is far
fewer than the number of deaths by illness but
much greater than any other cause, including more
than double the number of homicides.46
In Santa Clara County, during the years 2000
through 2009, there were 212 suicide attempts in
the Main Jail and 81 suicide attempts at Elmwood.
During that same time period, there were 12
completed suicides in the Main Jail and two
completed suicides at Elmwood.47
Suicides by Military Personnel—Active‐Duty,
National Guard, Reservists and Veterans
With our nation’s current level of international
military engagements, the active‐duty military
personnel, National Guard, reservists and veterans
are another group identified as facing higher risk
for suicide. The number of suicides among active‐
duty personnel has been rising, with 147 reported
suicides in the Army from January through
November 2009—an increase from 127 in the same
period of 2008. Among non‐active‐duty reserve
soldiers, 50 suicides were reported in 2008; but the
number had risen to 71 during the first 11 months
of 2009.48
The Navy reports “For the past 10 years, it (suicide)
has been the second or third leading cause of death
among active duty Sailors.”49
According to “Suicide Rivals The Battlefield in Toll on U.S. Military” by Jamie Tarabay as reported by National Public Radio on June 26, 2010, “Nearly as many American troops at home and abroad have committed suicide this year as have been killed in combat in Afghanistan.
Alarmed at the growing rate of soldiers taking their own lives, the Army has begun investigating its mental health and suicide prevention programs.” However, the article goes on to say that the tough challenge is “changing a culture that is very much about ‘manning up’ when things get difficult.”
Other experts agree that, similar to the general public, one of the main reasons that military personnel do not seek help with mental and emotional health issues is due to stigma and fear It takes the courage and
strength of a warrior to ask
for help. Help is available
for veterans 24 hours a day.
VA Suicide Prevention Hotline
number is:
1‐800‐273‐TALK (8255). Push “1”
for Veteran services
Veteran Suicide Chat Service at
www.suicidepreventionlifeline.org
VA Palo Alto
Telephone Care Line 800‐455‐0057
VA Palo Alto
Main Number 650‐493‐5000
____________________________
Military personnel and veterans are
not the only ones who can seek help.
Military members, spouses, and
their families who need assistance
with locating services
in their area can contact:
Military One Source 800‐342‐9647
or www.militaryonesource.com
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 37 of 136 that seeking help will negatively impact their
careers. “A study published in the New
England Journal of Medicine in 2004 showed
that of those active duty service members
who screened positive for a mental health
problem (PTSD, major depression,
generalized anxiety disorder), only 23‐40%
sought mental health care. Perceived
barriers to seeking treatment included fear
of being seen as weak, of being treated
differently by unit leadership, and of other
members of their unit having less confidence
in them.”50
Correspondingly, veterans, regardless of
when they served or in which branch, are
twice as likely as the general population to
die by suicide, according to an article in the
Journal of Epidemiology and Community
Health (July 2007).51 Suicides among United
States military veterans ballooned by 265
from 2005 to 2007, according to statistics
released by the Veterans Affairs (VA)
department. The VA estimated that in 2005,
the suicide rate per 100,000 veterans among
men ages 18‐29 was 44.99, but jumped to
56.77 in 2007.52
“Of the more than 30,000 suicides in this
country each year, fully 20% of them are acts
by veterans,'' said VA Secretary Eric Shinseki.
“That means on average 18 veterans die by
suicide each day. Five of those veterans are
under our care at VA." Suicide rates among
veterans in all four branches of the military
service are significantly higher than in the
general population.53
Veterans are more likely than the general
public to use firearms as a means for suicide.
“The odds of firearm use (among suicide
decedents) among male and female veterans
were 1.3 and 1.6 times higher, respectively,
than among their nonveteran counterparts
If you are a veteran or know a veteran in
need of medical or mental health
services, the following resources are
available:
Suicide Prevention Lifeline 800‐273‐8255
(TALK)
VA Palo Alto:
Main Number 650‐493‐5000
Telephone Care Line 800‐455‐0057
Returning Veterans 650‐493‐5000
Coordinator x60007
Addiction Consultation Team 866‐717‐1978
Homeless Veterans
Rehabilitation 800‐848‐7254
Men's and Women's
Trauma Recovery 650‐614‐9997
x24692
VA Palo Alto Website
http://www.palo‐alto.med.va.gov
VA Palo Alto on Facebook
http://www.facebook.com/vapahcs
Veteran Suicide Chat Service
www.suicidepreventionlifeline.org
National Center for PTSD
www.ncptsd.va.gov
VA Palo Alto Health Care System Locations:
Palo Alto Division located at 3801 Miranda
Avenue, Palo Alto, CA 94304; phone: 650‐493‐
5000.
Menlo Park Division located at 795 Willow Road,
Menlo Park, CA 94025; phone: 650‐614‐9997.
San Jose CBOC located at 80 Great Oaks
Boulevard, San Jose, CA 95119; phone: 408‐363‐
3000.
Monterey CBOC located at 3401 Engineering
Lane, Seaside, CA 93955; phone: 831‐883‐3800
Capitola CBOC located at 1350 N. 41st St., Suite
102, Capitola, CA 95010; phone: 831‐464‐5519
Local Vet Center Locations:
Peninsula Vet Center located at 2946 Broadway
Street, Redwood City, CA 94062; phone: 650‐299‐
0672
San Jose Vet Center located at 278 North 2nd
Street, San Jose, CA 95112; phone: 408‐993‐0729
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 38 of 136 after adjusting for age, marital status, race and region of residence.” 54 U.S. Census data show there are 106,430 veterans in Santa Clara County.55 Approximately 40,000 of that number are veterans of the Vietnam‐era service, however, the theaters of service for an increasing number are Iraq and Afghanistan.
Data compiled for the Veterans Administration Palo Alto Health Care System show that among its patients there were 126 suicide attempts and 1 completed suicide from October 2007 through September 2008. There were 96 suicide attempts and 7 completed suicides from October 2008 through September 2009. There were eight attempts and zero completed suicides in December 2009 alone.
Other Possible Correlations: More Data Is Needed
Varying levels of forensic analysis often may be needed to determine if a death was caused by suicide, homicide, accident or natural causes. More extensive collection, maintenance and analysis of data related to suicides will be key to ongoing efforts to effectively prevent suicides and to decision‐making about where to allocate prevention resources.
Suicides by Occupation. Dr. John Q. Baucom, Ph.D., writes in his book, Fatal Choice, "More professionals commit suicide than others. Farm workers have the lowest incidence among occupational groups. Dentist and physicians take their lives at the rate of 6½ to one over the general population. Lawyers commit suicide at a ratio of five to one over the general population." A web site, straightdope.com, cites an unnamed California study which found that dentists were surpassed in suicide rates only by chemists and pharmacists. Presumably, a Washington State study found that dentists had a suicide rate second only to sheepherders and wool workers. However, our review could not substantiate that these data are accurate.
One of the largest studies on this topic was conducted by the National Institute of Occupational Safety and Health (NIOSH) in 1995, which concluded that the medical field definitely has a higher suicide rate. But beyond that, NIOSH researchers said the picture is equivocal: Often the studies are only of one geographic area, sometimes they have methodological problems, and sometimes they contradict each other.
In another study, a sociology researcher at the University of California, Riverside, Augustine Kposowa, Ph.D., looked at records over nine years for about half a million people of whom 545 died by suicide. After controlling for such variables as age, income, race, marital status and region of residence, he found that only laborers and the unemployed had significantly higher risks. On the other hand, he found "dramatic" differences for suicide among the industries where people work. At highest risk were those in mining, business and repair services, wholesale and retail trade and construction. Again, which, if any, of these data are accurate is unclear and there is no data to examine whether these conclusions apply to Santa Clara County.
Police‐Involved Suicides. Some of the first research into “suicide by cop” was completed by Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 39 of 136 Sgt. Rick Parent of the Delta Police Department in British Columbia. Parent's research of 843 police shootings determined that about 50% were victim‐precipitated homicide. Police defined victim‐precipitated homicide as "an incident in which an individual bent on self‐destruction engages in life threatening and criminal behavior to force law enforcement officers to kill them."56 Again, further research is needed to determine the extent to which this type of suicide occurs in other locations.
Suicides by Police Officers. Research has been limited; but there are some indications that there are approximately 450 law enforcement suicides per year nationally, versus 150 officers who die annually in the lines of duty.57
Suicides Labeled as Auto Accidents. The real
percentage of suicides among car accidents is not
reliably known, Studies by suicide researchers
indicate that "vehicular fatalities that are suicides
vary from 1.6% to 5%." Some suicides are
misclassified as accidents because suicide must be
proven. "It is noteworthy that even when suicide is
strongly suspected but a suicide note is not found,
the case will be classified an accident.” 58 59
Some researchers believe that suicides disguised as
traffic accidents are far more prevalent than
previously thought. One large‐scale community
survey (in Australia) among suicidal persons
provided the following numbers: "Of those who
reported planning a suicide, 14.8% (19.1% of male
planners and 11.8% of female planners) had
conceived to have a motor vehicle “accident.” Of all attempters, 8.3% (13.3% of male attempters) had previously attempted via a motor vehicle collision.”60 Other Misidentified Suicides. It is unknown how many suicides are not classified as intentional deaths on their death records. However, some means of suicide are believed to be more commonly unreported. For example, it is believed that some portion of fatal poisonings coded as unintentional or undetermined are actually suicides. Under‐reporting of suicide has been attributed to factors such as pressure from families and subjectivity among coroners and medical examiners. As compared with firearms and suffocation, suicide by poisoning is considered to be particularly susceptible to underreporting. The rapid rise in unintentional poisonings in recent years has led some to wonder whether part of this increase represents misdiagnosed suicides.61
Suicide Clusters and Suicide “Contagion.” A suicide cluster is defined as multiple deaths by suicide that occur within a defined geographical area and fall within an accelerated time. These clusters consist of more than three victims, typically ranging from 13 to 24 years old, and occur Providing Hope and Help: SACS Hotline
Darcy (a SACS volunteer) took a cell call from a
hysterical college graduate who was driving on the
freeway with a loaded gun at her side. The caller said she was going to shoot herself because she did not
get into the medical school that she wanted. The
caller’s husband was in Iraq and the caller had no
support system in this area and was under a lot of
stress. Darcy was able to calm the caller down by
gaining her trust through offering care and concern.
The caller agreed to drive herself to the hospital while Darcy stayed with her on the phone. Approximately
three years later, the caller called back to thank Darcy and to tell her that she had become a pediatrician.
Santa Clara County’s 24‐Hour Toll‐Free
Suicide And Crisis Services (SACS) Hotline:
1‐855‐278‐4204
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 40 of 136 within approximately a one‐to‐two‐year period. Contagion is the process in which the death by suicide of an individual influences an increase in the suicides of others. Exposure to another individual’s suicide can precipitate imitative
suicidal behavior.62
How impactful exposure to suicide is as a
risk factor for suicide is an active area of
research. A 1996 study was unable to find a
relationship between suicides among
friends,63 however, a 1986 study found
clusters of suicide among teenagers
following the televising of news stories
regarding suicide. These clusters are
thought to account for 5% of teenage
suicides.64
Between 1984 and 1987, journalists in
Vienna covered the deaths of individuals
who jumped in front of subway trains. The coverage was extensive and dramatic. In 1987, a campaign alerted reporters to the possible negative side effects of such reporting and suggested alternative strategies for coverage. In the first six months after the campaign began, subway suicides and nonfatal attempts dropped by more than 80%. The total number of suicides throughout Vienna dropped as well.65
The Centers for Disease Control and Prevention (CDC) reports that suicide clusters account for 100‐200 deaths annually. Suggestions for minimizing suicide contagion include understanding the “circles of vulnerability” in order to identify those most at risk after a suicide has occurred in the community. “Circles of vulnerability include individuals who:
Had a negative interaction with the victim shortly before the suicide occurred and who perhaps even encouraged it
Were in a suicide pact but backed out at the last minute Realize now that they missed the obvious warning signs of suicide Were suicidal at another time, regardless of whether they had know the victim Have mental health problems.”66
Homicide‐Suicides. Murder‐suicide perpetrators appear to be vastly different from perpetrators of homicide alone. Whereas murder‐suicide perpetrators were found to be highly depressed and overwhelmingly men, other murderers were not generally depressed and were more likely to include women in their ranks.67
College years: Identification of a friend in crisis
I was 19 and in my first year of college. I ran often
with a dorm‐mate who lived just across the hall. His
name was “Billy.” One Friday afternoon just before
Thanksgiving break, Billy asked to go on a run with
me. He said “I really need to talk to someone.” He
didn’t’ say about what. I indicated that I was just
packing up to leave for the holidays but I’d take a
rain check. He seemed more disappointed than
what I would have expected. I left for the holiday.
Billy stabbed himself to death two days later. I’ve
never forgotten the “window of opportunity” I so
blindly missed that Friday afternoon. To this day I
feel a sense of responsibility for the outcome and a
great deal of shame for my inability to hear a cry for
help and my failure to be a friend.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 41 of 136 Factors that May Contribute to Suicidal
Behavior among Young Adults Transitioning to
Financial Independence
Major life transitions, such as leaving home for
the first time, may exacerbate existing
psychological difficulties or trigger new ones.
Real or perceived stress may contribute to the
development of stress disorders—including
suicidal behaviors.
Parental pressure to succeed academically or
professionally
Economic pressure to successfully complete a
course of education and training in a shorter
period of time may increase stress.
Mounting financial burdens, worries about time
away from careers and being out of the
workplace, and uncertainties about the future
job market (especially for those pursuing
research and academic careers) are additional
stressors for students in college, graduate
programs, vocational and technical schools.
Suicide Risk and Mental Illness
Of the 14.8 million Americans who live with
depression, the majority will not attempt suicide.68
However, research has shown a definite correlation
between depression and suicide, as well as a
significant association with all mood disorders and
suicide. Varying studies have shown that between
60% and 90% of suicide victims had a psychiatric
illness at the time of their death. Most common
are mood disorders (depression, bipolar disorder, borderline personality disorder, etc.) and substance abuse.69 70 71 72 73 When both mood disorders and substance abuse are present, the risk for suicide is much greater, particularly for adolescents and young adults.74 Children and Youth. Among Santa Clara County parents who participated in a 2006 survey commissioned by the Lucile Packard Foundation for
Children’s Health, 5.8% were “very concerned” about
their child’s level of depression and an additional 14.1% were “somewhat concerned.”75 At the same time, one‐
quarter to one‐third of seventh, ninth and eleventh
graders reported symptoms of depression (feeling so sad or hopeless for at least two weeks during the previous
year that they stopped doing some regular activities).76 Further, 16.3% of the seventh, ninth and eleventh
graders
reported
they seriously considered, and 8.2% reported
they actually attempted, suicide during the
previous year.77
Nationally, more teenagers die by suicide than
from cancer, heart disease, AIDS, birth defects,
stroke, pneumonia, influenza, and chronic lung
disease combined.78
Young Adults. Some experts estimate that
about 25% of all young people suffer from
depression by the time they are 24, however,
very few seek help. Depression affects one out
of six college students; and, as mentioned
previously, suicide is the second leading cause
of death among college students.79 Again,
same‐aged youth and young adults who are not
in college are actually at a higher risk for suicide
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 42 of 136 attempts than are college students. 80
Adults. In 2005, California Health Interview Survey data showed that 18% of adults in Santa Clara County reported they needed
help for emotional or mental
problems; however, only 8% of adults
had seen a health professional for
these problems.
A review of Santa Clara County
Mental Health Department Call
Center records show that less than
30% of the people who seek services
from the Department’s system
receive mental health treatment.
Coupled with this, a large‐scale
epidemiological study shows that less
than 30% of people with psychiatric
disorders seek treatment.81 Taken
together—less than 30% of those
who need services seek services—
and—less than 30% of those who
seek services receive services—it is
readily apparent that there is a
significant unmet need for mental
health treatment, including
depression and additional mood
disorders among others.
Older Adults. Depression, one of the
conditions most commonly
associated with suicide in older
adults,82 is a widely under‐recognized
and under‐treated medical illness.
Studies show that many older adults
who die by suicide—up to 75%—visited a physician within a month before death.83 These findings point to the urgency of improving detection and treatment of depression to reduce suicide risk among older adults.
In today’s society older adults are at risk for isolation, loneliness, and depression as their family members move away and they leave the workforce. A recent study of Santa Clara County older adult participants in congregate nutrition programs found that the primary reason for participation in the program is socialization.84 In 2006, 16.2% of Santa Clara County adults age 65 and older reported having one or more days per week when their mental health was not good.85 Warning Signs ‐ National Suicide Prevention Lifeline
There are a few warning signs that clearly indicate that someone is struggling with the decision to injure themselves:
Threatening to hurt or kill oneself or talking about wanting to hurt or kill oneself.
Looking for ways to kill oneself by seeking access to firearms, available pills, or other means.
Talking or writing about death, dying, or suicide when these actions are out of the ordinary for the person.
However, many warning signs go unrecognized by others or are minimized by the people who sense that there is something wrong with the person exhibiting these signs:
Repeated expressions of hopelessness, helplessness, or desperation.
Seeing no reason for living or having no sense of purpose in life. Making threats.
If someone you know or love is exhibiting worrying behaviors, symptoms, or choices that are a change and these changes remain for more than a period of a few days, then you can help by asking them how they are feeling. Often people recognize one or two “odd” things/ changes, but don’t ever consider suicide as a possibility. Whatever the manner someone you know or love is showing worrying behaviors or thoughts, the best thing loved ones can do is ask “Are you thinking about suicide as an option?” Many people fear that by asking that they might be “suggesting” suicide to the person. On the contrary, it allows a person who is considering it an opportunity to ask share their feelings, find that someone else really cares, and seek help. By asking you can help them consider other options, such as calling a crisis hotline, seek help from a doctor, faith leader, or mental health clinician.
National Suicide Prevention Lifeline
1‐800‐273‐TALK (8255) or
1‐800‐273‐TALK (8255) press 1 for Veterans
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 43 of 136 In addition, in Santa Clara County, one‐fourth of seniors are also caregivers. Caregivers are at high risk for depression, with approximately 11% of full‐time professional caregivers reporting a major depressive episode in the past year compared to 7% for all occupations.86 Studies show that 16% of caregivers report a decline in their health after taking on the caregiver role, and about half of caregivers who care for someone with Alzheimer’s disease develop psychological distress.
Lesbian, Gay, Bisexual, Transgender Individuals. Depression and suicide also appear to significantly affect members of the LGBT community. A Santa Clara County 2005 Lesbian Gay, Bisexual and Transgender Needs Assessment and Report on Emotional Well‐Being and Mental Health was conducted and prepared by the Billy DeFrank LGBT Center. Among respondents, 22% stated that within the past year they needed help for depression and 7% said they needed suicide prevention help.
Military Personnel—Active Duty, National Guard, Reservists, and Veterans. Although local statistics on mental illness and co‐occurring disorders among veterans are scarce (i.e., the Mental Health Department does not capture data on veteran status), the high incidence of mental illness among veterans is well documented by other sources. The National Alliance on Mental Illness (NAMI) Veterans Resource Center reports that more than 100,000 combat veterans sought help for mental illness since the start of the war in Afghanistan in 2001, about one in seven of those who have left active duty since then, according to VA records. Almost half were PTSD cases.87 The total of mental health cases among war veterans grew by 58% from 63,767 on June 30, 2006, to 100,580 on June 30, 2007, VA records show. The mental health issues include PTSD, drug and alcohol dependency, and depression.88
Recent data from the Defense Medical Surveillance System from self‐assessments since 2005 of service members who served in Iraq show that 50% of US Army National Guardsmen and some 45% of US Army and Marine reservists have reported mental health concerns.89 Of all those using VA health care, 30% suffer from depressive symptoms, two to three times the rate of the general population.90
Again, it is critical to review statistics about depression with the knowledge that research has shown up to 90% of people who kill themselves have depression and/or another diagnosable mental or substance abuse disorder with a depressive component.91 With this in mind, it is particularly alarming to recognize that more American adults suffer from depression (14.8 million)92 than coronary heart disease (7 million), cancer (6 million) and AIDS (200,000) combined.93
Suicide Risk and Alcohol Consumption
In Santa Clara County, 17.6% of adults responding to the Public Health Department’s Behavioral Risk Factor Survey engaged in binge drinking within the previous 30 days, and 2.7% of the respondents’ answers classified them as heavy drinkers or at risk of heavy drinking patterns.94 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 44 of 136 Among the many other reasons this is worrisome (liver and heart disease, increased chances of certain cancers, etc.), alcohol dependence is an important risk factor for suicidal behavior.
Suicide completers have high rates of positive blood alcohol, and intoxicated people are more likely to attempt suicide using more lethal methods. Further, alcohol may be a significant factor in suicides among individuals with no previous psychiatric history.95 It has been found that alcohol intoxication increases suicide risk up to 90 times, in comparison with abstinence.96 Alcohol is involved in an estimated 30% of suicides.97 Alcohol causes depressed mood, lowers inhibitions, and impairs judgment, any or all of which may make vulnerable people more likely to act on suicidal plans. These same factors (lowered inhibition and impaired judgment) are also associated with domestic violence and abuse, other factors that are believed to increase the likelihood that suicide will occur.
Suicide Risk Factors and Warning Signs
Experts tell us that there are many circumstances
that can contribute to someone's decision to end
his/her life, but a person's feelings about those
circumstances are more important than the
circumstances themselves. All people who consider
suicide feel that life is unbearable. They have an
extreme sense of hopelessness, helplessness, and
desperation. In addition, with some types of mental
illness, people may hear voices or have delusions
which prompt them to kill themselves. If you or
someone you know experiences these, there are
services that can provide support and guidance:
National Suicide Prevention Lifeline‐ 1‐800‐273‐TALK
(8255) and Santa Clara County’s Suicide and Crisis
Services (SACS) 24‐Hour Crisis Hotline: Toll‐Free 1‐
855‐278‐4204.
The U.S. Substance Abuse and Mental Health Services
Administration (SAMHSA) Suicide Prevention
Resource Center identifies three categories of risk
factors: biopsychosocial, environmental, and
sociocultural. SAMHSA literature stresses the
importance of understanding these well‐documented
risk factors because the impact of some risk factors
can clearly be reduced by certain interventions (i.e.,
medication for depression). Other risk factors cannot
be changed (i.e., a previous suicide attempt),
however, awareness by friends and family of the
heightened risk, particularly during periods of
SAMSHA* Categories of Risk
Biopsychosocial Risk Factors
Mental disorders, particularly mood disorders,
schizophrenia, anxiety disorders, and certain
personality disorders
Alcohol and other substance use disorders
Hopelessness
Impulsive and/or aggressive tendencies
History of trauma or abuse
Some major physical illnesses
Previous suicide attempt
Family history of suicide
Environmental Risk Factors
Job or financial loss
Relationship or social loss
Easy access to lethal means
Local clusters of suicide that have a
contagious influence
SocioCultural Risk Factors
Lack of social support and sense of isolation
Stigma associated with help‐seeking
behaviors
Barriers to accessing health care, especially
mental health and substance abuse treatment
Certain cultural and religious beliefs (for
instance, the belief that suicide is a noble
resolution of a personal dilemma, the family
can work this out alone)
Exposure to the influence of others who have
died by suicide, including through the media
*Substance Abuse and Mental Health Services
Administration
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 45 of 136 recurrence of significant stressful life events, should lead to strengthened social support.
In addition to risk factors, a number of organizations devoted to suicide prevention publish lists of warning signs, with the objective of helping people recognize common indicators in order that they can offer support and assistance that will cause the person to reconsider their suicidal plans. Among the many such organizations that have developed warning sign lists are Suicide.org, American Foundation for Suicide Prevention, SAVE (Suicide Awareness Voices of Education), Centers for Disease Control and Prevention Injury Center, American Association of Suicidology, and the National Suicide Prevention Lifeline.
Factors That May Protect Against Suicide
Protective factors buffer individuals from suicidal thoughts and behavior. To date, protective factors have not been studied as extensively or rigorously as risk factors. Identification and understanding of protective factors are, however, equally as important as research concerning risk factors. Identified protective factors against suicide are:
Effective clinical care for mental, physical, and substance use disorders Easy access for a variety of clinical interventions and support for help‐seeking Restricted access to highly lethal means of suicide
Strong connections to
family and community
support
Support through ongoing
medical and mental health
care relationships
Skills in problem solving,
conflict resolution, and
nonviolent handling of
disputes
Cultural and religious
beliefs that discourage
suicide and support self‐
preservation.98
Young at Heart
I am 65 years old and I have been severely depressed for at least 60 of them. My parents have been positive I carried some "family genetic defect that goes back for over 120 years." They said as much to me and calling me a “nasty little son of a bitch”. They abused me emotionally and sexually and made me feel responsible for it and eventually made me available to a homosexual man. I never was able to overcome the personal stigma and emotional breakage I suffered then or the power my mother held over me until I was almost 60 when I finally gave up and tried to kill myself. I suffered in every way possible during those years—not being able to finish college, and being unable to hold a decent job for many years. I had to rely on my parents for support, which only helped me in one way. My mother kept me in virtual servitude, even when I finally did get a job.
The gist of this is that the emotional breakdown I suffered so many years ago lasted until I was past 60 when, to get away my horrific memories and the constant badgering of my mother, I made two nearly completed suicide attempts, which finally got me into the Barbara Aarons Wing at Valley Med Center and into quality psychiatric care. I even "graduated" from Catholic Charities' FSP Older Adult program almost a year ago. I finally learned that I was not responsible for the things that happened to me and that I might just have been sane in an insane world or family. I am well, with my medication and occasional adjustments to it. Now, I am a 65 year old adolescent looking forward to life.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 46 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 47 of 136 IV. Review and Summary of Local Needs
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 48 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 49 of 136 IV. Review and Summary of Local Needs
The committee and staff members’ research on suicide risk factors, populations at high risk, available resources, and effective programs is consistent with the American Foundation for Suicide Prevention’s Best Practices Registry recommendation for a data‐driven planning process that “typically will involve multiple stakeholders in a process of assessing local needs, assets, and readiness, and choosing interventions that match local problems and circumstances.” Local Needs across the Lifespan
The SPAC members agreed to utilize age groupings that worked well in the Mental Health Department’s Mental Health Services Act (MHSA) planning processes. These groups are:
1. Children and Youth Ages 0 through 15
2. Youth and Young Adults Ages 16 through 25
3. Adults Ages 26 through 59
4. Older Adults Ages 60 and over
5. Strategies Applicable Across Age Groups.
The charge of the SPAC was to examine the risk factors most prevalent within each of the age groups that may contribute to the consideration or decision to take one’s own life; second, to match each of these age groups with targeted high risk sub‐groups or “priority populations” among those age groups based on the data review; and third to recommend strategies most appropriate to diminish risk among that population group/s in the context of Santa Clara County’s demographics. A simple “logic model” was utilized for the work:
The SPAC members devoted a portion of each meeting to discussions in break‐out groups by these age categories. For each age category, the Identified Needs and Concerns were derived from discussion of known suicide risk factors and identification by committee members of the highest priority needs and concerns to be addressed in Santa Clara County. Likewise, the Recommended Priority Populations reflect examination of data and decisions about which groups within each population category are at highest risk or highest need for focused prevention and intervention efforts.
Finally, the Recommended Strategies were developed to respond to the Recommended Priority Populations and were selected based upon reviews of effective and promising programs and the insights and expertise of the SPAC members. While priority populations were the focus, it was with the understanding that prevention strategies that reduce the suicide risk for high‐risk groups also will provide the benefit to the general population.
Agree
on needs
related to
suicide risk
Validate
needs w ith
supporting
data
Associate
needs
w ith risk
populations
Recommend
risk
prevention
strategies
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 50 of 136 Children and Youth Ages 0 through 15
1. Identified Needs and Concerns
Inadequate sense of control in a life phase when youth have limited control over their lives Difficulty accessing available mental health services, education and support to prevent substance abuse Lack of strong resiliency skills to cope with failure and disappointment, bullying, and breakups Inadequate defined support, connections to community, unconditional acceptance, and sense of communal responsibility for safety
Low feelings are perceived as abnormal
Lack of self‐esteem, sense of accomplishment, and sense of hope Lack of respect for peers, adults, and themselves
2. Recommended Priority Populations
Children and youth experiencing:
Academic difficulties; changing schools; life milestones Immigration concerns; refugee experience; acculturation stress; linguistic and/or cultural differences Trauma (sexual, physical, emotional, exposure to violence) Suicide of friends; suicide attempts; mental illness; substance abuse Separation from family; homelessness
Juvenile justice/foster care system involvement
Gender identity issues—lesbian, gay, bisexual, transgender, queer, or questioning Neglect and/or without nurturing adult
3. Recommended Strategies
Accessible mental health counselors in schools
Screenings of youth for risk of suicide and other mental health concerns Targeted counseling for youth who have lost a loved one to suicide Enhanced mental health resources, school curriculum, and parent initiatives Identify coping mechanisms, access points, and connectors for youth to address life challenges Programs to protect youth from social and geographic isolation and barriers to peer interaction Programs that teach resiliency
Programs and services that enable children and youth to cope with failure and disappointment, bullying, and breakups
Training for those who interact with at risk youth (community leaders, clinicians, physicians, family members, police, teachers, peers, and others)
Accessible, youth‐centered crisis line; and single, countywide access point/telephone number for youth at‐risk
Provide teens with support groups for youth dealing with teen suicide Provide prevention opportunities: Youth to become engaged in public service; school staff to be dynamic and caring; youth centers; develop students’ own skills to deal with emotional challenges. Educate parents and foster parents to recognize a child’s emotional needs and know the resources available to assist when child is in crisis.
Publicly recognize individuals who connect people at risk of suicide to resources Ensure post‐incident care for individual and family after a 5150 episode (forced admission for psychiatric observation)
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 51 of 136 Youth and Young Adults Ages 16 through 25
1. Identified Needs and Concerns
Sense of physical and emotional isolation from family, social network and/or peers Stigma associated with mental health and substance abuse services and suicide prevention Inadequate identification of mental health issues by self and others (caregivers, medical providers, etc.) Paucity of service resources and difficulty accessing age‐appropriate and linguistically available services (inadequate referrals, poor connections, barriers to qualify, difficult to afford, language barriers) Transitioning between being dependent on others to being financially independent without an adequate support network
2. Priority Populations
Young people experiencing:
Suicide of friends; previous attempts; thoughts of suicide Academic difficulties; immigration concerns; refugee experience; acculturation stress; linguistic and/or cultural differences
Transition from dependence to financial and personal independence, regardless of educational level or pursuits
Trauma (sexual, physical, emotional, exposure to violence) Mental illness; substance abuse; co‐occurring conditions Homelessness; alienation from family
Juvenile/adult criminal justice involvement; transitioning from incarceration to reintegrating with society Foster care system involvement
Gender identity issues—lesbian, gay, bisexual, transgender, queer, or questioning
3. Recommended Strategies
Screening and timely intervention of those at risk of suicide School‐based, culturally relevant intervention services, including consultation for educators and parents, and peer to peer support
Peer stipend program for youth to promote intervention and treatment services Training, support and educational materials for parents, partners, and family members and educators regarding safe handling of young adult life challenges and crises (Example: educational suicide help hotline)
Accessible and comfortable spaces for adults at‐risk of suicide, such as a mobile crisis unit, satellite self‐ help centers, and/or a community lounge space
Age‐appropriate crisis hotline
Support groups for youth dealing with teen suicide
Prevention opportunities, such as youth becoming engaged in public service; school staff to be dynamic and caring; youth centers; other ways for students to develop skills to deal with emotional challenges Previous attempters to share their stories to encourage others to seek help and have hope for improved life satisfaction
Public recognition of individuals who connect people at risk of suicide to resources Post‐incident care for individuals and families after a 5150 episode (forced admission for psychiatric observation)
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 52 of 136 Adults Ages 26 through 59
1. Identified Needs and Concerns
Inadequate identification of mental health issues by self and others (peers, medical providers, etc.) Paucity of service resources and peer support strategy assistance as well as difficulty accessing available services
Stress associated with life transitions, life events and trauma Stigma associated with mental health and substance abuse services and suicide prevention Cultural perspectives on mental health challenges and suicide Lack of safe welcoming places and opportunities to ask for assistance and services
2. Priority Populations
Adults experiencing:
Decreased functioning, isolation, disabilities or poor health Trauma (sexual, physical, emotional, exposure to violence) Suicide of friends; suicide attempts
Mental illness; substance abuse; and co‐occurring conditions Loss of income and/or a loved one
Criminal justice system involvement
Homelessness
Gender identity issues: lesbian, gay, bisexual, transgender, queer, or questioning Veterans
3. Recommended Strategies
Screening and assessments for risk of suicide
Support for adults at risk of suicide
Tools to safely handle life challenges and manage crises, such as cognitive‐behavioral theory and thought stopping.
Accessible counseling and crisis services
Mobile crisis unit
Self‐help centers in communities
Training, support and educational materials for friends, family members and employers regarding safe handling of personal challenges and crises, (Example: educational suicide help hotline) Previous attempters sharing their stories to encourage others to seek help and have hope for improved life satisfaction.
Collaboration between military personnel, veterans organizations and the Veterans Administration to make sure all veterans receive services and to design, implement and coordinate the most effective possible services
Work with business leaders and organizations to promote mental health awareness and education Public recognition of individuals who connect people at risk of suicide to resources Post‐incident care for individuals and families after a 5150 episode (forced admission for psychiatric observation)
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 53 of 136 Older Adults Ages 60 and Above
1. Identified Needs and Concerns
Inadequate identification of mental health issues by self and others (caregivers, medical providers, etc.) Paucity of service resources and difficulty accessing available services (inadequate referrals, poor connections, barriers to qualify, difficult to afford, lack of transportation) Loss or diminishment of independence, role, and physical health; loss of loved ones; physical difficulty in getting to services
Stigma associated with mental health and substance abuse services and suicide prevention Cultural perspectives on death and dying; differing definitions of a life of value; and cultural taboos against discussing end of life
Psycho‐social stressors can lead to increased risk not only of suicide but of homicide‐suicides
2. Priority Populations
Older Adults who are:
Caucasian males
Over 75
Isolated or grieving (widows/widowers), experiencing a loss in relationships or other significant change Experiencing a loss of sustainable income and/or personal resources Functioning poorly, have disabilities or poor health
Experiencing immigration concerns; refugee experience; acculturation stress; linguistic and/or cultural differences
Coping with trauma (sexual, physical, emotional, exposure to violence, veteran) Mentally ill; abusing medication, drugs, or alcohol
3. Recommended Strategies
Education, informing materials, and consultation support to primary care providers Depression screening, referral, linkage and follow‐up services through primary care providers Accessible, age‐appropriate counseling and treatment services Accessible senior‐focused crisis line; and single, countywide access point/telephone number Home visitation follow‐up services and linkage of homebound seniors to services Senior‐focused intervention for depression, death and dying issues Public recognition of individuals who connect people at risk of suicide to resources Post‐incident care for individuals and families after a 5150 episode (forced admission for psychiatric observation)
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 54 of 136 Cross‐Cutting All Ages
1. Identified Needs and Concerns
Paucity of service resources and difficulty accessing available services Difficulty accessing available mental health services, education and support to prevent substance abuse Stigma associated with mental health and substance abuse services and suicide prevention Cultural perspectives on mental health challenges and suicide Lack of safe of welcoming places and opportunities to ask for assistance and services
2. Priority Populations
Individuals experiencing:
Trauma (sexual, physical, emotional, exposure to violence) Suicide of friends; suicide attempts
Mental illness; substance abuse; and co‐occurring conditions Juvenile/criminal justice system involvement
Immigration concerns; refugee experience; acculturation stress; linguistic and/or cultural differences Homelessness; significant loss of social and/or economic support Gender identity issues: lesbian, gay, bisexual, transgender, queer, or questioning Transitions
3. Recommended Strategies
Screening and referral resources in primary care and other caregiving settings Training for professionals, service providers and community members on identification and response to individuals at risk
Crisis hotline and single, countywide access point/telephone number Accessible, affordable and appropriate crisis counseling and support services Mobile crisis unit
Self‐help centers in communities
Consultation phone services
Ensure post‐incident care for individuals and families after a 5150 episode (forced admission for psychiatric observation)
Public recognition of individuals who connect people at risk of suicide to resources Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 55 of 136 Additional Strategies: Community Education and Information The committee recognized the importance of broadly increasing knowledge of the risk factors and warning signs for suicide while promoting help‐seeking. By enhancing awareness of sources of help and reducing stigma associated with seeking help, these activities should prevent deaths by suicides as well as self‐injury while trying to die by suicide. Increased knowledge has been shown to create substantial change. Mothers Against Drunk Driver’s (MAAD) success in changing drunk driving from a person or family’s secret shame into a community responsibility with their “Friends Don’t Let Friends Drive Drunk” campaign is the recommended model for Santa Clara County’s suicide prevention public education campaign.
This strategy will include one universal message for the entire community. In addition, other targeted measures will be developed to engage smaller groups targeting youth, older adults, different language speakers, etc.
An educational campaign targeting improved physician assessment for suicidal risk and management of that risk also is recommended for implementation. Suicide data highlighted many areas of special concern. One example is data showing that a large portion of elderly persons who die by suicide had seen a health care professional within a relatively short period of time prior to their death.
A key concern that was raised by the committee is that in implementing an AdCouncil type public awareness campaign, these activities should be linguistically and culturally appropriate for our diverse community. It also should be broad in the means used to communicate. Youth and young adults are more receptive to internet technologies and social networking. For seniors, radio or television may be the media of choice. Some immigrant groups get their information primarily from foreign language radio, television and press. Others look to daily newspapers or listen to radio. Whatever approach is used, consideration for preferences, including social media, will be considered to most effectively reach the widest possible audience.
Additional Strategies: Communication Practices
In addition to reviewing needs of populations from a lifespan perspective, the committee members explored other critical areas that must be addressed in order to implement an effective suicide prevention effort in Santa Clara County. The Committee benefitted from several members who had been addressing the youth suicides in Palo Alto. Lessons learned include that for any comprehensive suicide prevention campaign to work, two essential elements should be included in the communication practices: 1) a coordinated communication strategy, and 2) educating all forms of media—television, radio, print, social network, internet, and other forms of media concerning the importance of adherence to the guidelines for reporting deaths by suicide, using the recommendations from the Suicide Prevention Resource Center’s Safe Reporting Guidelines.
While the community education and awareness campaign is its own strategy with the dual Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 56 of 136 objectives of 1) increasing community awareness of suicide, and 2) encouraging people to seek help for themselves or loved ones, in is important that it include the establishment of a body that will have oversight and coordinating responsibility of the Communication Practices Work Group. The group’s role will be to 1) ensure the development of defined, clear, concise, paradigm‐shifting message for all efforts; 2) ensure adherence to the guidelines for responsible communication on issues pertaining to suicide and that messaging is consistent across all media campaigns and efforts; 3) coordinate education on reporting suicide; and 4) establish and maintain a permanent website that is available for all to visit at www.sccgov.org/spac .
Media Education and Engagement
By and large, the bulk of the work will relate to
educating the media and formal public
communication.
Research has shown that graphic,
sensationalized or romanticized descriptions of
suicide deaths in the news and social media and
the internet can contribute to suicide contagion,
sometimes referred to as “copycat” suicides,
“media‐related suicide contagion,” or “cluster
suicides,” and other similar terms. In addition to
the danger of this phenomenon, media reports
on suicide can also be a source of
misinformation, for example, when suicide is
attributed to a single event, such as the loss of a
job or a relationship with no mention of
underlying factors such as the individual’s
depression, substance abuse, or lack of access to
treatment for these conditions.
In contrast, responsible coverage of suicide can
educate wide audiences about the likely causes
of suicide, its warning signs, trends in suicide
rates, recent treatment advances and other ways
suicide can be prevented. Stories about well‐known figures who have successfully sought treatment for depression, alcoholism and other conditions that convey suicide risk can also be a powerful impetus for readers to address such issues in their own lives.
Additional Strategies: Policy and Governance Advocacy
There is considerable infrastructure to be created for a prevention campaign to function effectively and for effective monitoring and evaluation activities to proceed. However, the development of this countywide infrastructure depends upon advocacy for supportive, enabling policies and legislation.
Safe Media Reporting on Suicide
Guidelines: What to Do
Always include a referral phone number
and information about local crisis
intervention services.
Emphasize recent treatment advances for
depression and other mental illness.
Include stories of people whose treatment
was lifesaving or who overcame despair
without attempting suicide.
Interview a mental health professional
who is knowledgeable about suicide and
the role of treatment or screening for
mental disorders as a preventive
strategy.
Emphasize actions that communities can
take to prevent suicides.
Report on activities coordinated by your
local or state suicide prevention coalition.
Guidelines provided by the
Suicide Prevention Resource Center
www.sprc.org
1‐877‐GET SPRC (1‐877‐438‐7772)
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 57 of 136 Individuals function within a larger system beyond their families. For example, children spend their days in schools, child care centers, youth centers, juvenile justice system, or alone. Adults spend the majority of their days at work, in higher education or vocational training schools, in the criminal justice system or alone. Without the support and active participation of these larger systems in adopting simple measures, any prevention campaign would be seriously hampered. Simple measures such as creating, adopting, and implementing policies regarding the awareness and identification of individuals in emotional crisis or dealing with a mental illness is a simple, effective step.
Again, the planning committee recognized that this will be an ongoing activity and will require additional investments of time and resources for successful implementation.
Additional Strategies: Data Monitoring and Evaluation
As the SPAC reviewed national information about suicide and suicide risk, it became clear that nowhere in our nation is detailed information available at the local level in a way that provides policy makers and stakeholders with the amount of information needed to accurately describe the profile of who is at risk of suicide. Further, there is no clear way in which those suicide prevention efforts that
currently are in place, or may
be implemented with
approval of this plan, can be
evaluated for their
effectiveness without a
clearly defined, measureable
monitoring and evaluation
process in place.
The data monitoring strategy
will include overseeing the
coordination, collection, and
reporting of useful data in
close partnership with the
Medical Examiner and Coroner’s Office. With the large, dissimilar number of agencies that are mandated to report self injury and “proven” suicides, there is much work to be done to agree on basic data needed; establish or adapt existing processes for reporting, collecting, and analyzing that data in a timely manner; and monitor data to evaluate the success of these efforts.
Local Suicide Resources: A Range of Services
As a part of the process of determining local priorities, the SPAC assessed available local resources. Several Santa Clara County Mental Health Department programs were identified as contributing to the reduction of suicides. Moreover, these programs already are consistent with the recommendations of the California Strategic Plan on Suicide Prevention. A full listing I don’t want to die: The good work of SACS
Bob (a SACS volunteer) took a call from a teenage girl who wanted to be called Zee (not the caller’s actual name). Zee was extremely distraught because she was having problems with her mother who was mentally ill.
Zee called because she had just consumed an entire bottle of medications.
Zee was hysterical because she decided that she didn’t want to die after all, but she was too afraid to go downstairs and tell her father that she had taken all of her medications. After gaining Zee’s trust and calming her down, Bob was able to convince Zee to go downstairs with the empty bottle and to turn it upside down in front of her father so he could see that all of the medications were gone. Bob told her that she didn’t need to say anything to him. Then Bob asked Zee to call him back after she had done this. Zee called back about 10 minutes later and told Bob that she and her parents were in the car on their way to the hospital’s emergency room.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 58 of 136 of agencies, programs and services that interact with individuals who die by suicide are listed in Attachment 2 in the Appendix. Some of the programs are specific to suicide prevention, such as the County‐operated Suicide and Crisis Services (SACS), a 24‐hour hotline staffed by a combination of paid and unpaid volunteers that respond to 35,000 calls per year from the community. As is common with many crisis hotlines, a small percentage of the calls are for immediate suicide interventions. The bulk of calls are for non‐suicidal crisis help and information, which helps to prevent individuals from reaching the point of considering suicide.
SACS also provides support groups and other support programs in collaboration with community‐based programs operated by Kara and the Bill Wilson Center’s Centre for Living with Dying. The EMQ Crisis Team provides in the field crisis intervention services to children and adolescents; and the County’s Emergency Psychiatric Services (EPS) provides 24‐hour emergency intervention to individuals who require immediate psychiatric treatment, often meeting involuntary treatment criteria as “danger to self.” Pending and Future Additional Prevention Resources
In addition to these existing programs, the County's efforts to reduce suicides will be further enhanced when the Mental Health Services Oversight and Accountability Commission (MHSOAC) facilitates the implementation of the Statewide Suicide Prevention Program. The County will benefit though previously approved assignment of local MHSA funds to this statewide effort. Approximately $13.7 million in local MHSA funds have been assigned for several statewide projects, including Suicide Prevention, Stigma and Discrimination Reduction, and School Mental Health Initiatives.
In addition, the Mental Health Department is currently implementing several projects approved by the MHSOAC in our local Prevention and Early Intervention Plan. Those projects include:
“Early Onset of Mental Illness” – a prevention and early intervention program focusing on the needs of transition‐age youth who may be experiencing at risk mental states (ARMS) or the onset of serious psychiatric illness with psychosis (e.g., schizophrenia).
One study found that 15% of participants in an early psychosis program attempted suicide before beginning treatment.
Primary Care Behavioral Health Integration ‐ A project to integrate early intervention behavioral health services within primary care clinics to meet the emerging needs of adults and older adults. The project will use the Improving Mood—Promoting Access in Collaborative Treatment (IMPACT) model.
Outreach and Engagement – a grassroots "gatekeeper" and mental health literacy program that trains key community members to be more aware of and responsive to early signs and symptoms of emotional distress.
Community Investment Initiative ‐ Programs that enable underserved communities to develop and implement campaigns to reduce stigma and discrimination concerning mental illnesses within their communities so that individuals are more willing to promptly seek help.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 59 of 136 Moreover, these are only a few of the programs that will be included in the County's overall Prevention and Early Intervention (PEI) Plan. Through the PEI Plan, the Mental Health Department intends to bring mental health awareness into the lives of all members of the community and move the mental health system toward a "help‐first" approach. The County's plan also will be coordinated with several state‐administered, statewide PEI projects, including Suicide Prevention, Student Mental Health Initiative, Stigma and Discrimination Reduction, and Ethnically Specific Interventions. Together, statewide projects and local county PEI plans will create a system of prevention and early intervention services throughout the state.
What Experts Recommend
“Prevention efforts should ultimately reduce risk factors and promote protective factors. In addition, prevention should address all levels that influence suicide: individual, relationship, community, and society. Effective prevention strategies are necessary to promote awareness about suicide and to foster a commitment to social change.”99 Santa Clara County’s Suicide Prevention Plan, when taken as a coordinated and interwoven set of strategies and efforts, will act in concert to prevent suicide. Individuals as well as organizations will have a role to play to contribute to the success of this effort. Our entire community as a whole has an active choice—to value each life and recognize that even one life lost to suicide was a preventable death.
Best Practices—Evolving Knowledge
The Suicide Prevention Resource Center (SPRC), in collaboration with the American Foundation for Suicide Prevention (AFSP), maintains a Best Practices Registry (BPR). This project is funded by the Substance Abuse and Mental Health Services Administration (SAMHSA). The purpose of the BPR is to identify, review, and disseminate information about best practices that address specific objectives of the National Strategy for Suicide Prevention. The BPR has three sections:
Section I: Evidence‐Based Programs (including 1a: SAMHSA’s National Registry of Evidence‐ Based Programs and Practices; and 1b: SPRC/AFSP Evidence‐Based Practices); Section II: Expert and Consensus Statements; and Section III: Adherence to Standards.
Attachment 3 in the Appendix outlines ten prevention programs that address suicide and are currently listed on the NREPP registry: National Strategy for Suicide Prevention Ten Prevention Programs. In addition to the ten listed programs, the American Foundation for Suicide Prevention: Suicide Prevention Resource Center’s Evidence‐Based Practices list contains an additional two.
As we make gains in breaking the taboo of suicide, we have an opportunity to learn more and contribute to the nascent and ever changing field of suicide prevention best practices.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 60 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 61 of 136 V. What We Recommend:
Five Overarching and Interconnected Prevention Strategies Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 62 of 136 Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 63 of 136 V. What We Recommend:
Five Overarching and Interconnected Prevention Strategies The SPAC has identified five overarching recommendations, referred to as strategies that comprise the core of the Suicide Prevention Plan. These recommendations are born out of the values of the committee, the data and information reviewed and presented in this report, the personal experiences shared, and the feedback from the public forum. They are consistent with the American Foundation for Suicide Prevention Best Practices Registry suggestion, “In general, practitioners will achieve greater results by creating comprehensive approaches involving multiple layers of coordinated components.”
Strategy One ‐ Implement and coordinate suicide prevention and intervention programs and services for targeted high risk populations
Strategy Two ‐ Implement a community education and information campaign to increase public awareness of suicide and suicide prevention
Strategy Three ‐ Develop local communication “best practices” to improve media coverage and public dialogue related to suicide
Strategy Four ‐ Implement policy and governance advocacy to promote systems change in suicide awareness and prevention
Strategy Five ‐ Establish a robust data collection and monitoring system to increase the scope and availability of suicide‐related data and to evaluate suicide prevention efforts
While the basis for each strategy is summarized in the previous assessment section of this report, specific preliminary objectives for each strategy are outlined below. It is expected that once the broad strategies recommended in this plan are approved, an implementation plan will be written for each strategy. The implementation plan will further refine the objectives of each strategy as well as the steps to implementation and the budget requirements.
To ensure the successful project coordination and management, the Mental Health Department intends to hire a full‐time Suicide Prevention Coordinator and Liaison to State Office of Suicide Prevention. That selection process has begun, and it is expected that someone will be hired for that role by August or September 2010.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 64 of 136 Strategy One – Implement Suicide Intervention Programs and Services for Targeted High Risk Populations
Desired Outcomes
1. Decrease in the number of completed suicide acts.
2. Decrease in the number of attempted suicides.
3. Increase in the availability of culturally and linguistically appropriate and affordable intervention services in a variety of venues.
4. Improved and earlier identification and engagement of people dealing with mental illness.
5. Improvement in referral relationships to access appropriate care.
6. Increase in help‐seeking behavior from individuals with mental illness and from those who are connected to individuals with mental illness.
7. Increase in support services to the family members and social network of individuals with mental health issues.
8. Improvement in quality of life for individuals and their loved ones who are dealing with mental illness.
9. Increase in diversity of services and programs that are tailored to high risk populations—youth, elders, internet, face‐to‐face.
Target Populations
1. Populations with highest risk of engaging in suicidal behavior (identified in section V.
Review and Summary of Local Needs)
2. Individuals supporting persons at risk of suicide, such as significant others, family members, caregivers, professionals, clergy/faith leaders
3. Key service providers, such as mental health clinicians and primary care physicians, clergy, faith leaders, law enforcement
4. Community members
Current Activities and Recent Gains
Independent of this committee’s activities, other agencies are working to reduce and eliminate suicide. Discussed in more detail in Appendix 2, the following are summaries of ongoing intervention activities occurring in our county and possible next steps:
Suicide and Crisis Services (SACS). This County program provides residents with access to a 24‐hour telephone hotline. Operated primarily by 100 volunteers and with less than $90,000 in annual funding, the program fields over 35,000 calls annually from suicidal clients, concerned family members and other residents in crisis. Approximately ten percent of calls are from individuals with suicide ideation. Recommendation:
Evaluate if the community would be better served if SACS attained national Lifeline accreditation or whether to simply unify the three distinct phone numbers into one and expand the current program. [SACS consolidated its numbers to 1‐855‐278‐4204. Feb. 2011] Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 65 of 136 Strategy One ‐ Continued
Survivors of Suicide Group and grief /loss support programs operated by Kara and the Bill Wilson Center's Centre for Living with Dying. Recommendation: Identify how more groups can be established throughout the county and increase efforts to recruit moderators to provide this service.
SACS staff members provide training to various community organizations on suicide assessments and crisis intervention. Due to repeated budgetary restrictions, available staff to provide such valuable training is very limited. Recommendation: Seek alternative means and additional funding sources to be able to double or triple current trainings.
County Mental Health Services. This County program provides an array of mental health services to primarily Medi‐Cal beneficiaries and those who are uninsured. Approximately 22,000 children, adolescents, young adults, adults and seniors receive services annually through a network of County‐operated and contracted programs.100 Services range from outreach, peer advocacy, and case management to clinical care and support in a variety of community, outpatient, residential and day programs.
Community‐based organizations (CBOs). CBOs account for approximately half of the public mental health system’s capacity, and they are a key component of the entire public safety net. These CBOs address county residents’ behavioral health needs, including mental health concerns that involve the risk of suicide. The CBOs also leverage other funding sources and operate a variety of programs that address behavioral health needs that are not funded by the County Mental Health Department, such as the Status Offender Services network.
EMQ's Families First Child and Adolescent Mobile Crisis Program. This program responds to the serious emotional trauma of minors, offering services in the home, at school and in the community. The EMQ Team responds 24/7 and often facilitates hospitalization and/or crisis intervention services to suicidal children and youth with other community agencies for long‐ term care and assistance. There is only one team that covers the entire county.
Recommendation: 1) Investigate how this model could be expanded or replicated by other agencies. 2) Identify how this model could be expanded to provide similar services to adults.
Emergency Psychiatric Services (EPS). Operated at Valley Medical Center, EPS is the single psychiatric emergency receiving center in the county. The program is key in responding to acute mental health crises that often involve risk of suicide. The 24/7 EPS program provides intervention services to individuals experiencing acute psychiatric episodes and who may be a danger to themselves or others. Annually, approximately 7,500 individuals arrive at EPS on “5150 holds,” brought by law enforcement officers and others. The large majority of involuntary holds specify the “danger to self” criteria.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 66 of 136 Strategy One ‐ Continued
Mental Health Urgent Care (MHUC). This voluntary, unlocked, County‐run program also provides residents with crisis intervention services. Services at MHUC, which are available to walk‐ins, are provided daily from 8 am to 10 pm. Clients, family members, law‐ enforcement agencies and other first responders are encouraged to use MHUC to meet the needs of individuals experiencing severe emotional or psychological distress, including thoughts of self‐harm. Recommendation: Promote this service more broadly to increase utilization.
Police Crisis Intervention Training (CIT). In partnership with law enforcement agencies, the MHD is continuing to enhance law enforcement officers’ abilities to manage crises involving mentally ill residents. In addition to reducing the need for using deadly force, this program can save lives by giving officers tools they can use when encountering individuals who intend to lose their lives by intentionally threatening police officers (i.e., suicide by police).
Recommendation: 1) provide CIT training for cadets, and 2) collaborate with law enforcement to ensure that more officers receive Crisis Intervention Training (CIT). Golden Gateway. In addition to providing intensive case management and therapy to severely mentally ill older adults, this program conducts extensive outreach to and mobile assessments of homebound or shut‐in seniors who would benefit from mental health services. Golden Gateway’s services are important for preventing suicides in California. Adults aged 75 and over have the highest rates of suicide (California Strategic Plan on Suicide Prevention, June 2008).
Self‐Help Centers. These County programs offer drop‐in, self‐help and peer support for mental health consumers. Three programs provided in North, Central and South County locations offer the opportunity for consumers to find support and compassion within a supportive peer‐run setting.
Ethnic and Cultural Community Advisory Committees (ECCACs). Based on a similar philosophy to the self‐help centers, the ECCACs are family and consumer support teams from eight ethnic and cultural communities.
Gatekeeper Training. This will provide training to individuals in the community to increase the community’s ability to refer friends and loved ones to appropriate resources at an earlier point in an individual’s emotional crisis.
Integrating Behavioral Health Services in Primary Care. The Mental Health Department will announce a Request for Proposal to support integrating behavioral health services in community‐based, primary care settings by January 2011. Service delivery should begin by July 2012 and is intended to impact 4,200 individuals a year.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 67 of 136 Strategy One ‐ Continued
Mental Health Services Act (MHSA) Prevention and Early Intervention (PEI) Project 3‐ Prevention and Early Intervention for Early Onset Psychosis (in Youth and Young Adults 16‐ 25). This Request for Proposal was announced June 7, 2010. Service delivery of early identification and treatment services should begin in October 2010. It is intended to provide countywide intervention and treatment services to 30 new clients a year.
Recommended Actions
Convene an implementation committee to accomplish the following:
Conduct further research on specific practices for possible implementation and their costs Provide detailed analysis of available resources and service gaps Convene and implement a subcommittee for each age group Finalize recommended strategies
Develop process and performance metrics for recommended/adopted strategies Prioritize specific strategies in regard to available funding and leveraging opportunities Identify strategies to procure and implement funding for selected strategies Prepare strategic implementation plan to be informed by public process Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 68 of 136 Strategy Two – Implement a Community Education and Information Campaign to Increase Public Awareness of Suicide and Suicide Prevention
Desired Outcomes
The Community Education and Information Campaign will focus on achieving the following outcomes:
1. Increased awareness of mental health issues, including depression and suicide
2. Increased public awareness of suicide
3. Improved identification of people who are feeling suicidal
4. Improved public knowledge of how to respond to a person who is feeling suicidal
5. Increased awareness of how to engage in and access support services, grief counseling services, and postvention services
6. Decreased judgment or blame associated with suicidal thoughts and feelings Target Populations
This strategy involves a community‐wide suicide prevention and awareness campaign to reach:
1. General public of all ages
2. Medical providers and support staff
3. Mental health clinicians and support staff
4. Clergy and faith leaders
5. Caregivers
6. In‐home support workers and others who work with seniors and the disabled
7. Family members
Current Activities and Recent Gains
Assigned a temporary suicide prevention project coordinator and liaison to California Office of Suicide Prevention. Recommendation: Mental Health Department hires a suicide prevention project coordinator/liaison to the California Office of Suicide Prevention. Improved communications with the Santa Clara County Medical Examiner‐Coroner’s Office with the Survivor’s of Suicide Program operated by the County, to ensure surviving families are better informed of available grief support services. Instituted a dedicated website to suicide prevention on the Mental Health Department’s website: www.sccgov.org/spac with a focus on informing the public of this effort and improving awareness. Recommendation: Evaluate and determine the audience for the website, the main objectives for the website going forward, and the best manner to promote this website throughout the county.
Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 69 of 136 Strategy Two ‐ Continued
Promoted an existing youth‐focused (16‐24 years) suicide prevention website www.reachout.com. Following the success of its Australian website, which proved instrumental in reducing the rate of youth suicide in Australia by more than half,101 the Inspire USA Foundation launched its American website from its San Francisco‐based offices in March 2010. Reachout.com is an interactive website for young people that deals with coping with mental health problems; dealing with suicide and self‐harm; drugs, alcohol and tobacco; family relationships; friend and peer relationships; becoming independent; loss and grief; maintaining good health; romance, sexuality and pregnancy; school pressures; and violence. The Executive Director was a guest speaker at one of the SPAC’s meetings and is eager to partner more in our county’s suicide prevention efforts. Recommendation:
Promote this website broadly.
Caltrain, an active partner in this effort, has agreed to make available advertising space on their trains, stations and buses for the specific use of this public education and awareness campaign. Recommendation: Work in close partnership with local transportation agencies, including VTA, to identify available means for communicating outreach message to ridership. Also, forge a tri‐county or more partnership to share the cost of the outreach campaign, beginning with San Mateo and San Francisco Counties. Our county’s school districts and County Office of Education have been actively involved in the effort to reduce youth suicide and raise awareness among their staff on how to recognize students in emotional distress or crisis and how to intervene and provide support.
Recommendation: 1) Support schools in engaging their communities in dialogues about mental health and suicide prevention. 2) Track which school districts are adopting suicide prevention policies.
Enlisted clergy, other faith leaders and lay leaders in the faith community to join in this effort. One of the committee’s members, Bernie (Deacon) Nojadera represented Interfaith Connections and related the committee’s goals, learning and activities to members of that group. More concentrated work can be done. Recommendation: Collaborate with the faith community to promote mental health awareness and suicide prevention in their ministry and outreach.
Conducted a well attended Suicide Prevention Public Forum to obtain public comments and suggestions about suicide prevention and how to develop greater community awareness.
Recommended Actions
Utilize multi‐media tools in health care settings to promote awareness of mental health issues and suicide. Target Implementation Date: FY 2012 with award and implementation of Prevention and Early Intervention projects.
Support efforts such as Onyourmind.net, a youth‐oriented website that provides a safe and anonymous place for teens to get information and support from other teens. Youth are able to talk about anything on their minds, including relationships, school, depression, Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 70 of 136 Strategy Two ‐ Continued
stress, suicide, friends, parents, cutting, identity, and health. They also can submit a question to be answered on the Q&A page or connect to resources for additional information and support.
Enlist clergy, other faith leaders and lay leaders in the faith community to join in this community education and awareness effort. The elderly often have more regular contact with clergy and church members than with any other individuals or organizations. Seniors have the highest church attendance rates across all age groups, and clergy often are the first professional groups to which people turn when they have personal problems.102 Moreover, clergy and other faith leaders are among the few whose responsibilities regularly take them into homes and care facilities. Target Implementation Date: September 2009, after the Board of Supervisors has approved the Plan.
Build on current, successful MHSA‐supported efforts to coalesce the clergy and other faith leaders around efforts to better recognize and respond to emerging mental health needs and to recognize and combat signs of elder abuse, either caused by self‐neglect or perpetuated by others. All of these endeavors recognize that Santa Clara County is one of eleven counties in California predicted to experience the greatest population growth among its seniors.103 Target Implementation Date: September 2009, after the Board of Supervisors has approved plan.
Enlist suicide attempt survivors, suicide survivors (individuals who have lost a loved one to suicide), and suicide prevention collaborative members to conduct a “Listening Campaign” at multiple locations throughout the county. This follows the model implemented by the U.S. Army to solicit feedback on the emotional pulse of their communities. Additionally, this activity encourages awareness and discussion of mental health issues, suicide prevention and available resources. Recommendation: Kick off this effort after the Suicide Prevention Coordinator has been hired by the Mental Health Department. Gatekeeper Training. There are many models available. Recommendation: Identify and adopt the version or versions that would be most effective for our county to serve dual functions: 1) increase awareness and identification of individuals in need or emotional duress; and 2) improve community involvement in seeking support for individuals in emotional crisis or need.
Recommendation: Create a Communications Plan Work Group, discussed in Strategy 3, to play an advisory role in the following Community Education and Information activities:
• Create, replicate and implement a variety of tools and techniques to better inform people about suicide, suicide prevention, and mental health awareness. • Explore feasibility of creating a new PSA campaign or utilize and promote existing PSAs. For example, the AdCouncil has a current teen suicide prevention Santa Clara County Suicide Prevention Strategic Plan June 2010 Revised March 2011 Page 71 of 136 Strategy Two ‐ Continued
campaign sponsored by the U.S. Department of Health and Human Services, Substance Abuse and Mental Health Services Administration. • Ensure the Community Education and Information Campaign will include multi‐ media outlets as well as evaluating if new spots should be created or if we should promote and utilize existing campaigns. For example, “We’ve Been There” is an existing television spot with a partner “We’ve Been There” radio spot. “Angry Hurt Helped” and “Hopeless Lost Inspired” are some campaigns developed for print media. Social networking sites, as well as outdoor and interactive elements will need additional messaging created or existing messaging identified to be considered for possible use. • Ensure leveraging of existing and available media productions that promote awareness. For example: More Than Sad Films, produced by the American Foundation for Suicide Prevention (AFSP) in partnership with the New York State Office of Mental Health. This 25‐minute film and manual is part of an educational program to help teachers and other school personnel learn more about teen suicide and how they can play a role in its prevention. • Enlist a collaborative effort with our neighboring counties, San Mateo and San Francisco, to participate and perhaps leverage resources for a Silicon Valley‐wide multi‐media campaign.
Develop concise, clear messaging vehicles to quickly convey information. Give a voice to suicide attempt survivors and individuals who have lost a loved one to suicide (suicide survivors) so they can become a positive force in the community and prevent future suicides.