Industrial, Major. Manufacturing, fabrication, processing, and assembly of materials in a raw form.
Uses in this category typically create substantial amounts of smoke, gas, odor, dust, sound, or other objectionable influences that might be obnoxious to persons on an adjacent site. Uses include Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-15
but are not limited to, product assembly and distribution, vehicle and boat assembly, aggregate processing facilities, plastics and rubber products manufacturing, chemical product manufacturing, lumber and wood product manufacturing, petroleum refining, and pulp and pulp product industries.
Integrity. T he authenticity of an HRI property’s historic identity, evidenced by the survival of an HRI property’s visual and physical characteristics that existed during the HRI property’s period of significance.
Within the concept of integrity, the National Register criteria recognize seven aspects or qualities that, in various combinations, define integrity. These seven aspects are location, design, setting, materials, workmanship, feeling and association.
18.60.100 – “J” Definitions
Junk. Any worn out, cast off, or discarded article of material which is ready for destruction or has been collected or stored for salvage or conversion to some other use. Any article or material which, unaltered or unchanged and without further reconditioning, can be used for its original purpose as readily as when new, shall not be considered junk.
Junkyard. The use of any lot or portion thereof for the storage of junk, including scrap metals, salvage, or other scrap materials, or for the dismantling or “wrecking” of automobiles or other vehicles or machinery, whether for sale or storage.
18.60.110 – “K” Definitions
Kennel. Facility where five or more dogs, cats, or other small domesticated animals over the age of four months are kept, whether keeping is for pleasure, profit, breeding, or exhibiting, including places where the animals are boarded, kept for sale or hire. May also include daytime boarding and activity for animals (e.g., “doggie daycares”) and ancillary grooming facilities.
Kitchen. Any room or space within a structure, all or part of which is designed or used for cooking, preparation, refrigeration and storage of food and which includes any of the following equipment: stove, oven, range top, dishwasher, kitchen sink, microwave oven, and refrigerator/freezer .
18.60.120 – “L” Definitions
Landscaping. The planting and continued maintenance of suitable vegetation in conformity with the requirements of this Zoning Code. See Landscape Standards Chapter 18.36.
Lead Agency. A public agency as defined in Government Code Section 65929, as may be amended, which has the principal responsibility for carrying out or approving a project.
Library. Public facility that provides the use of literary, musical, artistic, or reference materials.
Liquor. Refers to spirituous or intoxicating liquor, including wine and beer.
Liquor Store. See “Retail Sales Establishments, Retail Sales”.
Live Entertainment, Incidental. A use as defined by City Code Chapter 5.61, that is provided appurtenant to food service in a restaurant and occurs during the same operating hours as food service.
Live Entertainment, Standalone Use. For the purposes of the Zoning Code, Live Entertainment has the same meaning as Entertainment, as defined in City Code Chapter 5.61, Public Entertainment Generally , when it does not qualify as Incidental Live Entertainment.
Live-Work Facility. Integrated dwelling unit and working space, occupied and used by a single household, designed or structurally modified to accommodate both residential occupancy and light work activity and Article 8: Definitions
8-16 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
that includes: a complete kitchen space and sanitary facilities in compliance with the Building Code and the working space shall only be reserved for and regularly used by one or more occupants of the unit.
Loading Dock. An off-street space provided for cargo vehicles, when loading and unloading.
Low-Barrier Navigation Centers. A housing-first, low-barrier, service-enriched shelter focused on moving people into permanent housing that provides temporary living facilities while case managers connect individuals experiencing homelessness to income, public benefits, health services, shelter, and housing. “Low barrier” means best practices to reduce barriers to entry, and may include, but is not limited to, the following:
(1) The presence of partners if it is not a population- specific site, such as for survivors of domestic violence or sexual assault, women, or youth.
(2) Pets.
(3) The storage of possessions.
(4) Privacy, such as partitions around beds in a dormitory setting or in larger rooms containing more than two beds, or private rooms.
18.60.130 – “M” Definitions
Machine Tools Manufacturing. See “Industrial”.
Maintained. Preserved in a condition or state of equivalent quality to that which was approved or required by the City. Unless the context demands otherwise, the term is synonymous and is interchangeable with the term “permanently maintained.”
Major Alteration. Any significant change that is subject to Director of Community Development review and approval in accordance with Chapter 18.76 SCCC or pursuant to City policy or procedure.
Major Transit Stop. Any of the following:
(1) a transit stop identified in the current version of Plan Bay Area; (2) an existing rail or bus rapid transit station; or
(3) the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods. As used in this definition, “intersection of two or more major bus routes” means that two or more bus routes converge, meet, or cross, and either a bus stop serving both lines is located in the immediate proximity of the intersection, or a separate bus stop for each bus line is located in the immediate proximity of the intersection. For purposes of clarification, if two bus lines run parallel to each other, such as a rapid bus and a local bus, then a bus stop serving both lines in a location where the lines run parallel does not constitute an “intersection” and does not qualify as a major transit stop.
Manufacturing Plant. See “Industrial”.
Massage Establishment. See City Code Chapter 5.40 for more information.
Mausoleum. See “Cemetery and Mausoleum”.
Median. An area between opposing lanes of traffic that may be unplanted or planted with trees, shrubs, perennials, and ornamental grasses.
Medical Services. Facility that provides in-patient and out-patient medical care.
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-17
Medical Services, Hospitals. Facilities providing medical, physical, psychiatric, or surgical services on a 24-hour basis for sick or injured persons primarily on an in-patient basis and including ancillary facilities for out-patient and emergency treatment, diagnostic services, training, research, administration, and ancillary services to patients, employees, or visitors (i.e., cafeteria, gift/flower shop, waiting rooms, etc.).
Medical Services, General (clinics, office, and laboratories). Facilities primarily providing outpatient medical, mental health, surgical and other personal health services, but which are separate from hospitals, including: medical and dental laboratories, medical, dental and psychiatric offices, outpatient care facilities, acupuncture, and other allied health services. Counseling services by other than medical doctors or psychiatrists may also be considered an “offices, business and professional” use.
Memory Care. A type of long- term care geared toward those living with Alzheimer’s disease or another form of progressive-degenerative dementia.
Mixed-use. A development consisting of one or more parcels developed as a cohesive development project and designed with a blend of various compatible uses (e.g., commercial retail, retail service, office, residential, civic, and institutional). The uses may be located vertically in the same structure or horizontally in separate structures.
Mobile Food Vendor. Licensed motor vehicle used for the preparation, sales, and/or distribution of food and beverages to the general public.
Mobile Food Vendor, Semi -Mobile. Any moveable, motorized cart, pushcart, or wagon without a fixed place of business that is used for the preparation, sales, and/or distribution of food and beverages to the general public. Includes street vendors and sidewalk vendors.
Mobile Fueling Delivery. On-site delivery of fuel, including but not limited to gasoline, diesel, liquified natural gas, liquified hydrogen, batteries or other fuel for automobiles, trucks and other vehicles.
Mobile/Manufactured Home. Factory-built structure that is manufactured or constructed under authority of 42 U.S.C. Sec 5403, Federal Manufactured Home Construction and Safety Standards, or California law (Health and Safety Code Sections 18007 and 18008) and is to be used as a place for human habitation.
The structure is manufactured either in whole or in substantial part at an off-site location, transported to the site, assembled on- site, and placed on a permanent foundation. For the purpose of the Zoning Code, a manufactured home shall be considered the same as any site-built single-family detached dwelling.
Mortuary or Funeral Home. Facility where deceased persons are prepared for burial or cremation, and funeral services may be conducted. Includes funeral homes and funeral parlors.
Museum. Public or quasi-public facility that provides space for preserving and exhibiting artistic, historical, scientific, natural, or man-made objects of interest. Activities may include the sale of objects collected and memorabilia, the sale of crafts work and artwork, boutiques, and the holding of meetings and social events.
18.60.140 – “N” Definitions
National Register of Historic Places . Means the National Historic Landmarks Register established pursuant to 54 U.S.C. Section 302101 et seq.
Nightclub. Commercial entertainment establishments open at night that typically provide food and alcoholic beverages and space for dancing and amplified music (e.g., live band, DJ, stereo sound system).
Nonconformity, Illegal. An illegally created parcel or a sign, structure, or use that was illegally constructed, created, installed, or initiated without proper permits or approvals, and which does not comply with the provisions of this Zoning Code.
Article 8: Definitions
8-18 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Nonconforming Parcel. A parc el legally created before the effective date of this Zoning Code, or subsequent amendment, which does not comply with the minimum area, depth, width, or other requirements of this Zoning Code.
Nonconforming Sign. A sign legally existing before the effective date of this Zoning Code, or subsequent amendment, which does not comply with the sign regulations of this Zoning Code.
Nonconforming Structure. A structure legally existing before the effective date of this Zoning Code, or subsequent amendment, which does not conform to the requirements of the zone in which it is located.
Nonconforming Use. A use of land and/or a structure legally existing before the effective date of this Zoning Code, or subsequent amendment, but which is no longer allowed in the zone in which it is located.
Nursery. Commercial establishment where plants and trees are grown for sale or for planting elsewhere.
May also include the sale of tools and nursery products.
18.60.150 – “O” Definitions
Occupancy. The act of using a site.
Office. Facility or businesses that predominantly offer professional and/or business services.
Office, Accessory. Office that is incidental and accessory to another business, manufacturing, or sales activity that is the primary use. Incidental offices that are customarily accessory to another use are allowed as part of an approved primary use. The qualification criterion for this definition is that the floor area of the accessory office use shall not exceed 20 percent of the total floor area.
Office, Business and Professional. Facilities and businesses that predominantly offer professional and/or business services including banks, architects, attorneys, accountants, advertising, computer support, land use planners, and other similar professional services and uses.
Office, Medical. See “Medical Services General (clinic, office, and laboratories)”.
Open Space. Any land or water not covered by structures, roadways, or parking lots.
Outdoor Dining and Seating. A dining area with seats and/or tables located outdoors of a restaurant, coffee shop, or other food service establishment, and which is (a) located entirely outside the walls of the subject structure, (b) enclosed on two sides or less by the walls of the structure with or without a solid roof cover, or (c) enclosed on three sides by the walls of the structure without a solid roof cover.
Outdoor Displays and Sales. Permanent outdoor display of merchandise incidental to an adjacent indoor retail use, and certain independent outdoor retail sales facilities (e.g., auction yards, flea markets, lumber and other material sales yards). Includes news and flower stands. Does not include the sale of motor vehicles, boats, and recreational vehicles ("Vehicle Sales"), or the rental of vehicles ("Vehicle Rentals”).
Outdoor Use, Storage. An uncovered but improved land area providing for the arrangement and storage of objects, items, commercial or industrial equipment, products, tools , or other materials, typically not in a fixed position and capable of rearrangement.
18.60.160 – “P” Definitions
Palisade Fencing. See “Fence, Palisade.”
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-19
Parcel. Tract or area of land established by plat, subdivision, or as otherwise permitted by law, to be used, developed or built upon as required by this Code, and fronting upon a street or a private easement adequate for purposes of access.
Parcel area. The total of the area, measured in a horizontal plane, within the parcel lines of a parcel.
Parcel, corner. A parcel located at the intersection of two or more streets at an angle of not more than 130 degrees. If the angle is greater than 130 degrees, the parcel shall be considered an “interior parcel.”
Parcel depth. The horizontal distance between the front and the rear parcel lines measured in the mean direction of the side parcel lines.
Parcel, flag. A parcel with access provided to the bulk of the lot by means of a corridor less than 25 feet in width. See illustration below.
Parcel line. Any line bounding a parcel as defined in this Article. See illustration below.
Parcel line, Front. A property line abutting a street.
Parcel line, Rear. The parcel line opposite the front parcel line.
Parcel line, Side. Any parcel line that is not a front parcel line or rear parcel line.
'
1 REARYARD/
SETBACK
--~---------.___.___.
FRONT YARD/
SETBACK
Article 8: Definitions
8-20 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Parcel, reversed corner. A corner parcel, the side line of which is substantially a continuation of the front parcel lines of the parcels to its rear, whether across an alley or not.
Parcel, substandard. A parcel of land that has less than the required minimum land area, width or depth as established by the zone in which it is located.
Parcel, through. A parcel having frontage on two dedicated streets, not including a corner or reversed corner parcel. See illustration below.
I
I
I
I
_____ I ____________ I ____ _
PARCEL LINE, REAR
PARCEL LI NE, SIDE
-
PARCEL LI NE, SIDE
PARCEL LINE, FRONT
lNOM; '3Nll 1DM\ld
PARCEL LINE, SIDE
-
PARCEL LI NE, SIDE
PARCEL LI NE, FRONT
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-21
Parcel width. The horizontal distance between the side parcel lines, measured at right angles to the parcel depth at the front setback line. See illustration below.
Parking Facility. A parking lot or parking structure customarily used for the temporary parking motor vehicles. Parking facilities should be either primary use or accessory use.
Park and Ride Facilit y. Designated area where vehicles may be temporarily parked in order to carpool with other commuters or to ride public transit.
Pawn Shop. A building or portion thereof where personal property is received and for which money is advanced, with the right of privilege granted to the person to whom said money is advanced to reclaim such property upon repayment of said money, together with all legal charges incident thereto. This does not banks, saving and loan institutions, credit unions, or other banking organizations regulated by State or Federal law.
Period of Significance. The span of time during which relevant events and activities occurred at an HRI property.
Personal Service, General. Commercial establishment that provides recurrently needed services of a personal nature. Illustrative examples of these uses include:
Barber and Beauty Shop
Clothing rental shop;
Dry-cleaning pick-up store with limited equipment;
Laundromats (self-service laundry);
Locksmith;
Nail salon;
Shoe repair shop;
Tailors and seamstress; and
Tanning Salon.
These uses may also include accessory retail sales of products related to the personal services provided.
I
I
I
I _____ I ____________ I ____ _
-
PARCEL, WIDTH
Article 8: Definitions
8-22 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Personal Service, Restricted. Commercial establishment that may tend to have a blighting and/or deteriorating effect upon surrounding areas/uses and that may need to be dispersed from other similar uses to minimize adverse impacts. Illustrative examples of these uses include:
Pawnshop ;
Check-cashing and Payday lending establishments ; and Tattoo service, branding or body piercing studio. The application of permanent makeup is specifically excluded from this definition.
These uses may also include accessory retail sales of products related to the personal services provided.
Photovoltaic Equipment. Items including a solar photovoltaic cell, panel or array, lines, mounting brackets, framing and foundations used for or intended to be used for collection of solar energy.
Photovoltaic (PV) System: A solar collection system consisting of one or more building- and/ or ground - mounted systems, solar photovoltaic cells, panels or arrays and solar related equipment that rely upon solar radiation as an energy source for collection, inversion, storage and distribution of solar energy for electricity generation. A solar photovoltaic system is a generation system with a nameplate capacity of not greater than 50 kilowatts if installed at a residential service or not larger than 3,000 kilowatts at other customer service locations.
Place of Assembly. Facility for public or private assembly and meetings, including civic and private auditoriums, banquet halls, community centers, conference and convention facilities; meeting halls for clubs, religious institutions (i.e., church, temple, synagogue, and mosque), a nd other membership organizations.
Preventative Maintenance. Any work to prevent deterioration or damage to the structural integrity or any exterior feature of an HRI property that does not involve a change in design, material or exterior appearance. Such work includes, but is not limited to, painting, wood trim or siding repair, roof repair, patching, caulking, foundation or chimney repairs, or landscape maintenance.
Primary Use. The main or principal use of land or structure, as distinguished from a secondary or accessory use.
Public Building. Structure used (both owned and rented) by public agencies, including city , county, Federal, and State administration buildings; fire stations, and other fire prevention and firefighting facilities; police and sheriff substations and headquarters, including interim incarceration facilities; public libraries, and post offices. Does not include facilities specifically identified under another land use category, including schools.
Public Park s and Playgrounds. Outdoor recreation facilities that provide a variety of recreational opportunities including playground equipment, open space areas for active and passive recreation and picnicking, and sport and active recreational facilities. May also include enclosed structures providing for recreational opportunities.
Public Safety Facility. Facility necessary to respond to immediate hazards or threats to public health and safety, including fire stations, other fire prevention and firefighting facilities, police and sheriff substations and headquarters, including interim incarceration facilities.
18.60.170 – “Q” Definitions
No terms defined.
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-23
18.60.180 – “R” Definitions
Recreational Facility, Indoor Amusement. Facility for participant sports and similar types of recreation, including indoor sports complexes, bingo parlors, billiard and pool halls, dance halls, clubs, ballrooms, bowling alleys, laser tag, indoor waterpark and/or aquatic park, and ice skating and roller rinks. This use may also include ancillary commercial facilities customarily associated with the above indoor commercial recreation uses, including but not limited to bars and restaurants, fast -food restaurants, and video game arcades.
Recreational Facilit y, Outdoor Amusement. Facility for various outdoor participant sports and similar types of recreation, including amusement, theme and kiddie parks; drive- in theaters; golf driving ranges independent from golf courses; miniature golf courses (golf courses are included under the definition of Parks and Playgrounds); outdoor waterparks and/or aquatic parks; skateboard parks and water slides; go- cart and miniature auto race tracks; recreation equipment rental (e.g., ATV’s and other non-highway motor vehicles, roller skates); tennis courts, swim and tennis clubs. May also include ancillary commercial facilities customarily associated with the above outdoor commercial recreational uses, including but not limited to bars and restaurants, fast-food restaurants, video game arcades, etc.
Recycling. The series of activities by which disca rded materials that would otherwise remain wastes are collected, separated, or processed and used to make new products. See Chapter 18.60.300 (Recycling Facilities).
Redemption Center. Facility where the public may donate, redeem, or sell recyclable materials.
Recycling Facilit y. A variety of facilities involved with the collection of recyclable materials. A "certified" recycling or processing facility is certified by the California Department of Conservation as meeting the requirements of the California Beverage Container Recycling and Litter Reduction Act of 1986. Recyclable material includes reusable materials that can be reconstituted, remanufactured, or reused in an altered form, including glass, metals, paper, and plastic.
Recyclable material does not include refuse or hazardous materials. This land use does not include storage containers located on a residential or nonresidential site used solely for the recycling of material generated on the site.
Research and Development Facilit y. Facility that conducts research, and the design, development and testing of electrical, electronic, magnetic, optical and mechanical components in advance of product manufacturing that may be associated with a manufacturing facility on the same site. Includes chemical and biotechnology and data computing research and development. May allow for minor manufacturing.
Residential Care Facility. Group care facility, or similar facility, as determined by the Director, in a single- family home for 24-hour nonmedical care in need of personal services, supervision, or assistance essential for sustaining the activities of daily living or for the protection of the individual.
Resource Protection and Restoration. Activities and management of an area to preserve, recreate and enhance natural resource values such as habitat for fish and wildlife; rare, threatened, and endangered plants; vernal pools; erosion control; and floodwater conveyance.
Resource-Related Recreation. Facilities related to passive recreation in open space areas including bicycle and pedestrian trails, picnic areas, parking areas, and interpretive centers.
Restaurant. Retail establishment (i.e., cafes, coffee houses, diners, food services) engaged in the business of selling/serving food and beverages prepared for both on- site and off -site consumption. This includes restaurants with sit-down table service and fast food restaurants that may include drive-thru service.
Article 8: Definitions
8-24 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Retail Sales Establishment. E stablishment, completely enclosed within structures, engaged in selling goods or merchandise to the general public for profit. Examples of these establishments and lines of merchandise include:
Retail Establishment, Small. A retail business focusing on the sale of merchandise not specifically listed under another use classification that is less than 75,000 square feet with less than 50 percent of the total sales floor area dedicated to nontaxable goods.
Retail Establishmen t, Medium. A retail business focusing on the sale of merchandise not specifically listed under another use classification that is at least 75,000 square feet but less than 150,000 square feet with less than 10 percent of the total sales floor area dedicated to nontaxable goods.
Retail Establishment, Large. A retail business focusing on the sale of merchandise not specifically listed under another use classification that is 150,000 square feet or larger with less than 10 percent of the total sales floor area dedicated to nontaxable goods.
Retail Sales. The following are examples retail sales and lines of merchandise that are allowed in the three previously described retail sales establishments:
art, antiques, and collectibles liquor store
artisan shop locksmith
art studio luggage and leather goods
artists' supplies lumber
motor vehicle parts and accessories medical supplies and equipment bakery (retail only) musical instruments, parts and accessories
bicycle sales and rentals newsstand
book office supplies
cameras and photographic supplies orthopedic supplies carpeting and floor covering paint and wallpaper
clothing and accessories pet store
convenience store pharmacy
drug and discount store religious goods
electronic equipment secondhand goods sales
fabrics and sewing supplies sign and banner shop
florists and houseplant store (indoor sales only) shoe store furniture sales small wares
gift shop specialty food and beverage
grocery store specialty shop
handcrafted items sporting goods and equipment
hardware stationery
hobby materials supermarket
household appliances toys and games
household furnishings thrift store
household products travel services
jewelry vehicle parts sales
kitchen utensils
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-25
Review Authority. The individual or official City body identified by this Zoning Code as having the responsibility and authority to review and approve or deny ministerial and discretionary permit applications and appeals described in this Zoning Code. Includes the City Council , the Planning Commission, t he Director, and the Planning Department.
Right-of-way. The right to make a way to and from another parcel of land. A type of easement granted or reserved over land for transportation purposes, (e.g., a highway, street, sidewalk, rail transport, or canal), as well as electrical transmission lines, oil and gas pipelines.
18.60.190 – “S” Definitions
Satellite Dish Antenna. An apparatus capable of receiving or transmitting communications from a satellite.
Secretary of the Interior’s Treatment Standards . T he Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings, published by the National Park Service, as may be amended.
School. Educational institution, whether public or private including elementary, middle, junior high, and high schools, serving transitional kindergarten through 12 th grade students, offering general academic
instruction equivalent to the standards prescribed by the State Board of Education, and including denominational and sectarian, boarding schools, charter schools, and military academies. Also includes community colleges, public or private colleges, universities, and professional schools granting associate arts degrees, certificates, undergraduate and graduate degrees, and requiring for admission at least a high school diploma or equivalent general academic training.
School, Charter. Schools which offer alternative educational opportunities separate from traditional public or private schools and are formed and publicly funded by teachers, parents, or community groups under the terms of a charter with a local or national authority.
School, Private. Any privately owned and operated elementary school, middle school, secondary school, high school, or other institution providing academic instruction for students from kindergarten through 12
th grade pursuant to the California Education Code.
School, Public. Public elementary schools, middle schools, secondary schools, high schools, and any other public school providing academic instruction for students from kindergarten through 12 th
grade pursuant to the California Education Code.
School, Private/Public Colleges and Universities. A post -secondary institution for higher learning that grants associate or bachelor’s degrees and may also have research facilities and/or professional schools that grant master and doctoral degrees. This may also include community colleges that grant associate or bachelor’s degrees or certificates of completion in business or technical fields. These institutions require at least a high school diploma or equivalent general academic training for admission. Includes community colleges, public or private colleges and universities, and technical schools.
Screening. The use of fences, walls, hedges, berms, or other features to shield, conceal, separate, or hide from view adjacent land uses.
Service-based Senior Living. Senior housing with services, which typically includes a commercial kitchen and the provision of meals. Residents are typically able to perform all Activities of Daily Living (ADLs). Not licensed by the State.
Setback. The distance a structure, parking area, or other development feature must be separated from a parcel line, other structure, development feature, or street centerline. See illustration below.
Setback, Front. The line which defines the depth of the required front yard.
Article 8: Definitions
8-26 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Setback, Rear or Side. The line which defines the width or depth of the required rear or side yard.
Setback, Side Corner. The line which extends between the rear property line and the front setback area on a corner parcel.
Shared housing building. Means a residential or mixed- use structure, with five or more shared housing units and one or more common kitchens and dining areas designed for permanent residence of more than 30 days by its tenants. The kitchens and dining areas within the shared housing building shall be able to adequately accommodate all residents. If a local ordinance further restricts the attributes of a shared housing building beyond the requirements established in this section, the local definition shall apply to the extent that it does not conflict with the requirements of this section.
A “shared housing building” may include other dwelling units that are not shared housing units, provided that those dwelling units do not occupy more than 25 percent of the floor area of the shared housing building. A shared housing building may include 100 percent shared housing units.
A “shared housing building” may include incidental commercial uses, provided that those commercial uses are otherwise allowable and are located only on the ground floor or the level of the shared housing building closest to the street or sidewalk of the shared housing building.
Shared housing unit. Means one or more habitable rooms, not within another dwelling unit, that includes a bathroom, sink, refrigerator, and microwave, is used for permanent residence, that meets the “minimum room area” specified in Section R304 of the California Residential Code (Part 2.5 of Title 24 of the California Code of Regulations), and complies with the definition of “guestroom” in Section R202 of the California Residential Code. If a local ordinance further restricts the attributes of a shared housing building beyond the requirements established in this section, the local definition shall apply to the extent that it does not conflict with the requirements of this section. For purposes of calculating a density bonus granted for a shared housing building, “unit” means one shared housing unit and its pro rata share of associated common area facilities.
I
I
I
I
_____ I ____________ I ____ _
I SETBACK, REAR I
I ! I I I
I I
I SETBACK LINE: I
SHM"S,°' !- - -! SHMC<S,OS
I I
I ----------------------------- I
I t I
I I
SETBACK, FRONT
::-:.:==-~---------~--=
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-27
Sign. Structures or other visual devices designed, constructed, and used for the purpose of communicating a message or identifying or attracting attention to a parcel, product, service, person, cause or event. (See Chapter 18.42 Sign Standards).
Sight Distance Area. A space on a corner parcel and any driveway or alley in which all visual obstructions (e.g., structures and plantings), that inhibit visibility and thus cause a hazard to traffic and pedestrian safety are prohibited. (See also Site Planning and General Development Standards Section 18.30.030).
Single Development Proposal. An application for an entitlement affecting multiple contiguous parcels and authorized by the owners of all of the affected properties, including but not limited to an application for a building permit, architectural review, rezone, general plan amendment, or subdivision.
Single Housekeeping Unit. An individual or group of persons in a common living arrangement occupying a dwelling. Evidence of a common living arrangement may include some or all of the following: sharing living expenses such as rent or mortgage payments, food and utility costs, a shared lease or shared chores.
Single Room Occupancy (SRO). Any residential structure containing more than five units intended or designed to be used, rented, or hired out to be occupied for sleeping purposes, generally for one person per unit. Individual units typically share communal features, (e.g., kitchen, bathroom, or entertainment area).
Site. As applied in the context of this City Code, means the location of a significant historical event, a prehistoric or historic occupation or activity, building or structure, whether standing, ruined or vanished, where the location itself maintains historical or archaeological value regardless of the value of any existing buildings, structures or objects. Examples of a site are a battlefield, designed landscape, trail, or industrial site.
Small Projects. Alterations to any historic resource as defined herein, involving negligible visible changes.
Alterations shall not qualify as small projects if they involve the removal or destruction of any exterior character-defining feature or historic fabric, including, but not limited to, original windows, or similarly protected interior features, unless an acceptable replacement is made with like materials and finishes, as determined by the Community Development Director.
Specialized Education and Training/Studio. School offering specialized education and training that typically offer certifications rather than academic degrees (e.g., dance, judo, painting).
Storage, Personal Facility. Facility with structures containing generally small individual compartmentalized areas or lockers rented as individual storage spaces and characterized by low parking demand. Ancillary outdoor storage for RVs’ and water vessels is also allowed. (Also, commonly referred to as “Mini Storage” or “Self-Storage” facilities.)
Storage, Warehouse. Commercial establishments offering the storage of furniture, household, office, or other commercial goods of any nature. Includes cold storage. Does not include: storage yards or personal storage facilities offered for rent or lease to the public (see “Storage, Personal Facilities”; or warehouse facilities in which the primary purpose of storage is for wholesaling and distribution (see “Wholesaling and Distribution Facilities”).
Story, Half. A half-story is a story under a gable, hip, or gambrel roof, the wall plates of which on at least two opposite exterior walls are not more than four feet above the floor of each story .
Structure. Anything constructed or built, any edifice or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner, which requires location on the ground or is attached to something having a location on the ground, including swimming and wading pools and covered patios, excepting outdoor areas (e.g., paved areas, walks, tennis courts), and similar recreation areas.
Structure, Historic Preservation. Refer to SCCC 18.06.010(s)(9). (Ord. 1972 § 1, 11-21-17; Ord. 2011 § 16, 2-11-20).
Article 8: Definitions
8-28 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Structure Coverage. A portion of a parcel which is covered by a structure(s) excepting structure overhangs, paved areas, walks, and swimming pools, regardless of whether or not the structure(s) is intended for human occupancy.
Structure, Primary. A structure in which the principal use is conducted.
Subdivision Sales Office. See “Temporary Uses”.
Supportive Housing. Housing with no limit on length of stay, that is occupied by the target population and that is linked to on- site or off -site services that assist the supportive housing resident in retaining the housing, improving his or her health status, and maximizing his or her ability to live, and when possible, work in the community. Supportive housing units are residential uses allowed in any zone allowing residential uses, subject only to those requirements and restrictions that apply to other residential uses of the same type in the same zone.
18.60.200 – “T” Definitions
Tattooing or Branding Shop. A building or portion thereof where the tattooing or branding of human body parts is administered or from which a tattooing or branding business or service is operated.
Temporary Use. Use established for a specified period of time, typically less than 12 months, with the intent to discontinue the use at the end of the designated time period.
Temporary Use Permit. An administrative permit authorizing specific limited term uses in compliance with conditions and performance criteria specified in Chapter 18.122 (Temporary Use Permits).
Transit Stations and Terminal. Facility where buses, trains, and other mass transit options regularly stop to load and unload passengers and goods.
Transitional Housing. Rental housing operated under program requirements that call for the termination of assistance and recirculation of the assisted unit to another eligible program recipient at some predetermined future point in time, which shall be no less than six months from the beginning of the assistance. Transitional housing units are residential uses allowed in any residential zone allowing residential uses, subject only to those requirements and restrictions that apply to other residential uses of the same type in the same zone.
18.60.210 – “U” Definitions
Use. The purpose (type and extent) for which land or a structure is arranged, designed, or intended, or for which either land or a structure is occupied or maintained.
Utility Facilities and Infrastructure. All equipment, fixtures, and personal property operated or maintained on private property in connection with the production or provision of water, sewer, power, natural gas, telecommunications, or other services, with the exception of Electric Power P lants.
18.60.220 – “V” Definitions
Vehicle Dismantling Facility. Any premises used for the dismantling or wrecking of motor vehicles required to be registered under the State Vehicle Code. Activities may include the buying, selling, or dealing in vehicles, their integral parts, or component materials thereof, and the storage, sale or dumping of dismantled, partially dismantled, wrecked or inoperative vehicles.
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-29
Vehicle Impound Facility. Holding or storage places for motor vehicles until they are placed back in control of the owner, recycled for their metal, stripped of their parts at a vehicle dismantling yard, or auctioned off for the benefit of the impounding agency.
Vehicle Rental.
Vehicle Rental, General. Commercial establishment that rents automobiles, construction equipment, motorcycles, recreational vehicles, trucks, trailers, and similar vehicles and equipment, including on-site storage and incidental maintenance that does not require pneumatic lifts, and only when conducted within a fully enclosed structure.
Vehicle Rental, Limited. Commercial establishment that rents small vehicles (e.g., mopeds, scooters, Segway’s), and similar sized vehicles with electric power or engines less than 100cc.
May also include the maintenance, minor repair, and on- site storage of the equipment offered for rent, and only when conducted within fully enclosed structure.
Vehicle Rental, Office Only. Office activities offering the rental of automobiles, motorcycles, recreational vehicles, trucks, and other types of transportation vehicles. Does not include the on- site storage of or incidental maintenance of these vehicles.
Vehicle Repair and Maintenance. The repair, servicing, alteration, restoration, towing, painting, cleaning, or finishing of automobiles, trucks, recreational vehicles, water vessels, golf carts, and other motor vehicles as a primary use, including the incidental wholesale and retail sale of vehicle parts as an accessory use.
This includes the following categories:
Major Motor Vehicle Repair. Establishments providing major repair of automobiles, boats, motorcycles, recreational vehicles, or trucks including light duty trucks (i.e., gross vehicle weight of less than 10,000 pounds) and heavy -duty trucks (i.e., gross vehicle weights of 10,000 pounds or more). Examples of uses include full-service motor vehicle repair garages; body, fender, and paint shops; brake shops; machine shops; paint shops; tire sales and installation shops; towing services; transmission shops; and tire recapping. Does not include vehicle dismantling.
Minor Motor Vehicle Repair. Establishments providing minor repair services of golf carts, automobiles, motorcycles, recreational vehicles, or light duty trucks, vans, or similar size motor vehicles (i.e., vehicles that have gross vehicle weights less than 10,000 pounds) including detailing services; installation of electronic equipment (e.g., alarms, stereos, etc.); servicing of cooling, electrical, fuel and exhaust systems; brake adjustments; relining and repairs; oil and lube shops; smog shops, tire and battery sales and installation (not including recapping); and wheel alignment and balancing. Does not include any type of car washing service.
Vehicle Sales.
Vehicle Sales, General. Sale of automobiles, construction equipment, motorcycles, recreational vehicles, trucks, and similar vehicles and equipment, including display, storage, maintenance, repair, and incidental rental of the vehicles and equipment. May include the sale, installation, and servicing of related equipment and parts. All maintenance and repair activities shall be conducted within a fully enclosed structure.
Vehicle Sales, Wholesale. Sales limited to an office only, offering the sale of automobiles and light duty trucks. Does not include on- site inventory, display, storage, maintenance, or repair of these vehicles. May be subject to parking requirements of the Department of Motor Vehi cles.
Vehicle Service Station. A commercial facility that sells gasoline, diesel, or alternative fuel for the on- site fueling of individual motor vehicles. May include incidental “minor” maintenance and repair (i.e., battery charging and tire changing and repair) of automobiles and light duty trucks, vans, or similar size motor vehicles (i.e., vehicles that have gross vehicle weights less than 10,000 pounds). May also include a convenience store operated by the service station owner.
Article 8: Definitions
8-30 November 2023 Public Review Draft – Santa Clara Zoning Code, Title 18
Very Low Vehicle Travel Area. An urbanized area, as designated by the United States Census Bureau, where the existing residential development generates vehicle miles traveled per capita that is below 85 percent of either regional vehicle miles traveled per capita or city vehicle miles traveled per capita. For purposes of this paragraph, “area” may include a travel analysis zone, hexagon, or grid. For the purposes of determining “regional vehicle miles traveled per capita” pursuant to this paragraph, a “region” is the entirety of incorporated and unincorporated areas governed by a multicounty or single-county metropolitan planning organization, or the entirety of the incorporated and unincorporated areas of an individual county that is not part of a metropolitan planning organization.
Veterinary Facilit y. A place where domestic animals or household pets are given medical or surgical treatment and are cared for during the time of treatment. Use as a kennel shall be limited to short time boarding and shall only be incidental to the hospital use.
Visible. Capable of being seen (whether or not legible) by a person of normal height and visual acuity walking or driving on a public road or in a public place.
Vocational School. See “Specialized Education and Training/Studios”.
18.60.230 – “W” Definitions
Wall, Masonry. A wall built from individual units which are often laid and bound together by mortar. Masonry walls are commonly used for separating/screening incompatible uses and for safety reasons.
Wholesaling and Distribution Facility . A commercial establishment engaged in the sale of goods or merchandise to retailers, industrial, commercial, institutional, or other professional business users, or to other wholesalers. In general, it is the sale of goods to anyone other than a standard consumer.
Wine Tasting Room. Facility in which wine products grown or processed on the owner's property may be tasted and sold. M erchandise offered for sale within the tasting room may also include souvenirs and clothing bearing the logo of the winery, as well as wine related items and other products that reflect or enhance the character or theme of the winery.
Winery. Bonded agricultural processing facilit y primarily used for the commercial processing of grapes or other fruit products into wine or similar spirits or the refermenting of still wine into sparkling wine. Processing consists of controlled fermentation combined with any of the following: crushing, blending, barrel aging, and bottling. Storage of case goods shall only occur in conjunction with processing. Retail sale of related promotional items may be allowed as part of the winery operation. A winery may include a tasting room as part of an accessory use if the floor area used for the tasting room is less than or equal to 25 percent of the total floor area of the facility.
Wireless Telecommunication Facility. See Chapter 18.66, Wireless Telecommunications Facilities.
Wireless Telecommunication Facility , Microcell. See Chapter 18.66, Wireless Telecommunications Facilities.
18.60.240 – “X” Definitions
No terms defined.
Definitions
Public Review Draft – Santa Clara Zoning Code, Title 18 November 2023 8-31
18.60.250 – “Y” Definitions
Yard. Any open space on the same parcel with a structure(s) or a dwelling group which open space is unoccupied and unobstructed from the ground upward to the sky, except for the projections or accessory structures allowed by this Zoning Code. See illustration below.
Yard, front. The space between the front of the structure and the front parcel line or highw ay setback line and extending the full width of the parcel.
Yard, rear. The space between the rear of the structure and the rear parcel line and extending the full width of the parcel.
Yard, side. The space extending from the front yard, or from the front parcel line where no front yard is required by this Zoning Code, to the rear yard, or rear parcel line, between a side parcel line and the side of the structure.
18.60.260 – “Z” Definitions
Zone. A portion of the territory of the City within which certain uses of land, premises, and structures are permitted, other uses are permitted through approval of a discretionary permit from the City, and other uses are not permitted and within which certain development standards are established.
I
I
I
I _____ I ____________ I ____ _
YARD, REAR I
I ,-- -- -- -- --!-- -SITiici,i,i : i
: : •. --------------- ---- ---::
I : : : I
YARD, SIDE I--:+ : ...;..._ I YARD, SIDE
I : : : I
I : : : I
i : l ; i
YARD, FRONT
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
24-1525 Agenda Date: 1/9/2024
REPORT TO STADIUM AUTHORITY BOARD
SUBJECT
Action on Stadium Authority Bills and Claims for the Month of October 2023
BOARD PILLARS
Enhance Community Engagement and Transparency
Ensure Compliance with Measure J and Manage Levi’s Stadium
BACKGROUND
Disbursements made by the Stadium Authority are based on invoices submitted for payment. Prior to payment, staff reviews all disbursement documents to ensure that the invoiced goods or services have been provided.
The Bills and Claims listing represents the cash disbursements required of normal and usual operations during October 2023. Budget control is set by the Stadium Authority Board through the budget adoption process.
DISCUSSION
Effective August 31, 2022, the Stadium Authority and Stadium Manager agreed to the timely payment of Shared Stadium Expenses and other budgeted expenses in accordance with the Annual Stadium Authority Budget, except for buffet expenses invoiced pursuant to Section 4.6.1 of the Stadium Lease. The Stadium Authority maintains the right to confirm and dispute submitted charges from the 2021-22 fiscal year and subsequent years during a fiscal-year-end reconciliation/true-up. This is primarily done to address any concerns regarding improper allocation, calculation, lack of support, or failure to comply with applicable contracts or laws, among other reasons. The Stadium Authority may raise such questions with respect to any charge at any time before a fiscal year-end reconciliation/true-up and the Stadium Manager must assess and respond to such questions in good faith.
At its March 7, 2023 meeting, the Stadium Authority Board adopted the Santa Clara Stadium Authority Fiscal Year 2023-24 Operating, Debt Service, and Capital Budget which runs from April 1, 2023 to March 31, 2024. Expenses paid in October 2023 include:
· Payments totaling $212,439.23 to the City of Santa Clara for the following:
o $143,126.28 for reimbursement of General and Administrative (G&A) City payroll costs (e.g.: Executive Director’s Office (City Manager’s Office), Counsel’s Office (City Attorney’s Office), and Treasurer’s Office (Finance Department)) o $69,312.95 for Senior/Youth Fees for NFL Games 1-3
· Payment totaling $4,998,906.00 to Stadium Funding Trust for Term A Loan - Interest · Payment totaling $1,189,128.97 to Forty Niners Stadium Management Co, LLC for October City of Santa Clara Printed on 1/2/2024Page 1 of 2
powered by Legistar™
24-1525 Agenda Date: 1/9/2024
2023 Stadium Manager Expenses
· Payments totaling $30,489.81 to EyeP Solutions, Inc. for CapEx Project - Enhance Stadium Security Coverage
· Payment totaling $4,863.99 to InTWO, Inc. for Financial Management System Monthly Services (September 2023)
· Payment totaling $20,600.00 to KPMG LLP for SCSA 2021/22 Audit · Payment totaling $300.00 to M. Arthur Gensler Jr. & Associates, Inc. for CapEx Project - Smoke Evacuation System - Fire Smoke Curtain Replacement · Payment totaling $7,425.80 to Wilson, Ihrig & Associates, Inc. for Stadium Noise Monitoring Services (August 2023)
· Payment totaling $81,575.00 for Legal Services (August 2023)
ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to section 15378(b)(4) of Title 14 of the California Code of Regulations in that it is a fiscal activity that does not involve any commitment to any specific project which may result in a potential significant impact on the environment.
FISCAL IMPACT
The fiscal impact to the Stadium Authority is $6,546,480.32
COORDINATION
This report has been coordinated with the Stadium Authority Counsel’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library.
RECOMMENDATION
Approve the list of Stadium Authority Bills and Claims for October 2023.
Reviewed by: Kenn Lee, Treasurer
Approved by: Jovan D. Grogan, Executive Director
ATTACHMENTS
1. October 2023 SCSA Bills and Claims
City of Santa Clara Printed on 1/2/2024Page 2 of 2
powered by Legistar™
Payment Date Vendor Invoice No. Description Fund Amount 10/16/2023 Bank of America N/A September 2023 Bank Fees - CapEx Reserve Account CapEx 316.30 10/16/2023 Bank of America N/A September 2023 Bank Fees - Operating Reserve Account Operating 435.22 751.52
10/24/2023 City of Santa Clara N/A B2318 SCSA Admin Payroll Costs Operating 83,257.42 10/24/2023 City of Santa Clara N/A B2319 SCSA Admin Payroll Costs Operating 59,868.86 10/23/2023 City of Santa Clara N/A Senior/Youth Fees for NFL Game 1 Operating 23,036.65 10/23/2023 City of Santa Clara N/A Senior/Youth Fees for NFL Game 2 Operating 21,872.20 10/23/2023 City of Santa Clara N/A Senior/Youth Fees for NFL Game 3 Operating 24,404.10 212,439.23
10/2/2023 Stadium Funding Trust N/A Term A Loan - Interest Debt Service 4,998,906.00 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Security Operating 132,276.03 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Stadium Ops Operating 381,670.06 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Engineering Operating 226,068.86 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Guest Services Operating 54,270.34 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Groundskeeping Operating 55,112.25 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - SBL Sales & Service Operating 194,437.29 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Insurance Operating 84,161.67 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Other G&A Operating 52,799.14 10/2/2023 Forty Niners Stadium Management Co, LLC SLS-24233 October 2023 Stadium Manager Expenses - Lender Fees Operating 8,333.33 1,189,128.97
10/17/2023 EyeP Solutions, Inc. 23-402 CapEx Project - Enhance Stadium Security Coverage CapEx 7,941.84 10/17/2023 EyeP Solutions, Inc. 23-415 CapEx Project - Enhance Stadium Security Coverage CapEx 22,547.97 30,489.81
10/31/2023 InTWO, Inc. 35116 Financial Management System Monthly Services (September 2023) Operating 4,863.99 10/17/2023 KPMG LLP 8005026238 SCSA 2021/22 Audit Operating 20,600.00 10/17/2023 M. Arthur Gensler Jr. & Associates, Inc. 1083723 CapEx Project - Smoke Evacuation System - Fire Smoke Curtain Replacement CapEx 300.00 10/31/2023 Wilson, Ihrig & Associates, Inc. 22162N4 Stadium Noise Monitoring Services (August 2023) Operating 7,425.80 10/31/2023 1356542 Legal Services (August 2023) Operating 81,575.00 October 2023 Total 6,546,480.32$
Santa Clara Stadium Authority
Bills and Claims
Expenses Paid by Wire or ACH Transfer
For the Month of October 2023
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
24-1507 Agenda Date: 1/9/2024
REPORT TO STADIUM AUTHORITY BOARD
SUBJECT
Action on Stadium Manager’s Request to Approve an Agreement with Giant Construction LLC for the Women’s Locker Room CapEx Project
BOARD PILLAR
Ensure Compliance with Measure J and Manage Levi’s Stadium
BACKGROUND
As the Stadium Manager of Levi’s Stadium, Forty Niners Stadium Management Company LLC is responsible for maintaining “the Stadium in the Required Condition and operate the Stadium as a quality NFL and multi-purpose public sports, public assembly, exhibit and entertainment facility” as required by the Management Agreement between the Stadium Authority and Stadium Manager.
The Stadium Authority Fiscal Year (FY) 2023/24 Capital Expense (CapEx) Budget includes a $329,123 line item for a Women’s Locker Room project. The project, as described, converts a portion of the auxiliary locker room area to accommodate a larger private space for female athletes, performers, officials, and other female event day sporting and entertainment professionals visiting or working events at Levi's Stadium. The project will include the design, permitting, and construction of alterations necessary to accommodate these new designated spaces necessary to provide equal accommodations. This area is not related to the Home Team Locker Room and Visitor Team Locker Room, which are located in a different area of the Stadium.
The Stadium Manager is requesting approval for the following actions related to the Women’s Locker Room CapEx Project:
1. Approve a one-time agreement with Giant Construction LLC in the amount of $239,900 to renovate the auxiliary locker room areas to accommodate a larger private space for female event day professionals visiting or working events at Levi’s Stadium;
2. Authorize the Stadium Manager to execute any and all documents associated with, and necessary for the award, completion, and acceptance of the project; and
3. Authorize the Stadium Manager to execute change orders up to $23,990, for a total not to exceed construction agreement amount of $263,890.
A Recommendation for Award Memo was submitted describing the project, solicitation process, and the Stadium Manager’s request (Attachment 1).
DISCUSSION
Stadium Authority staff reviewed the Stadium Manager’s Recommendation for Award memo, supporting documentation, and draft agreement (Attachment 2) for consistency against the City’s City of Santa Clara Printed on 1/4/2024Page 1 of 3
powered by Legistar™
24-1507 Agenda Date: 1/9/2024
public works bidding practices (City Charter Section 1310). The Stadium Manager’s Request for Bids (RFB) received three responses and the Stadium Manager is recommending award to the apparent low bidder, Giant Construction LLC.
Based on the documentation and provided information, staff recommends approval of the Stadium Manager’s request related to the Women’s Locker Room CapEx Project.
The Stadium Authority Counsel’s Office has reviewed the requested agreement for comparison to the Stadium Authority’s customary language. While there are some differences in the language, including portions covering compliance with laws such as prevailing wage and conflict of interest, the agreement submitted here for approval contains the necessary language which identifies these legal obligations to the vendor. The vendor expressly agrees to adhere to such obligations upon its execution of the agreement. Nothing in the proposed agreement changes the Stadium Authority’s rights under the Management Agreement and specifically with respect to any dispute that may arise from the Stadium Manager’s obligations under the Management Agreement.
The Stadium Authority reserves all rights to confirm and dispute charges by and payments to the Stadium Manager during a fiscal year-end reconciliation/true-up, including but not limited to changes based on improper allocation, calculation, lack of support, or failure to comply with the Parties’ contracts or California law. The Stadium Authority may raise related questions before the fiscal year- end reconciliation/true-up, which the Stadium Manager agrees to assess and respond to in good faith.
ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(a) as it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.
FISCAL IMPACT
As noted above, the FY 2023/24 CapEx Budget contains $329,123 for the Women’s Locker Room CapEx Project. There are sufficient funds to cover the cost of the one-time agreement and up to 10% for change orders (a total not to exceed $263,890). The Stadium Authority is responsible for all CapEx project costs.
COORDINATION
This report has been coordinated with the Stadium Authority Counsel and Treasurer’s Offices.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library.
RECOMMENDATION
1. Approve the Stadium Manager’s request to award an agreement to Giant Construction LLC in City of Santa Clara Printed on 1/4/2024Page 2 of 3
powered by Legistar™
24-1507 Agenda Date: 1/9/2024
the amount of $239,900 to retrofit the auxiliary locker room area for the Women’s Locker Room CapEx Project;
2. Authorize the Stadium Manager to execute any and all documents associated with, and necessary for the award, completion, and acceptance of the project; and
3. Authorize the Stadium Manager to execute change orders for the agreement up to $23,990 for a total not to exceed amount of $263,890.
Prepared by: Christine Jung, Assistant to the Executive Director Approved by: Jovan D. Grogan, Executive Director
ATTACHMENTS
1. Stadium Manager’s Recommendation for Award Memo
2. Draft Agreement with Giant Construction LLC
City of Santa Clara Printed on 1/4/2024Page 3 of 3
powered by Legistar™
1 Date: November 29, 2023
To: Jovan Grogan
Executive Director
Santa Clara Stadium Authority
From: Jenti Vandertuig
Procurement Director
Forty Niners Stadium Management Company LLC
Subject: Recommendation for Award RFB FY23-0056 Women’s Locker Room Project at Levi’s Stadium.
Recommendation
1. Recommend approval and award of a one-time contract to Giant Construction LLC in the amount of $239,900, for the Women’s Locker Room Project (Project) at Levi’s Stadium.
2. Authorize Stadium Manager to execute any and all documents associated with, and necessary for the award, completion, and acceptance of this Project; and
3. Authorize Stadium Manager to execute change orders up to 10% or $23,990 for a total not to exceed construction contract amount of $263,890.
Solicitation Process
Forty Niners Stadium Management Company LLC (Stadium Manager) has a need to construct a women’s locker room at Levi’s Stadium (Stadium). The Project was approved as part of the FY23/24 SCSA Capital Expenditures budget. The Project included converting a portion of the auxiliary locker room area to accommodate a larger private space for female athletes, performers, officials, and other female event day sporting and entertainment professionals visiting or working events at the Stadium. The Project included design, permitting and construction of alterations necessary to accommodate these new designated spaces necessary to provide equal accommodations.
On October 2, 2023, Stadium Manager issued a Request for Bids (RFB) FY23-0056 for the Project.
Stadium Manager published the RFB on Bonfire Interactive, Stadium Manager’s eProcurement portal https://49ers.bonfirehub.com/portal/. In addition to inviting a list of contractors on our established supplier list, Stadium Manager also selected contractors registered on the portal with specific commodity codes offering such services.
STADIUM
FORTY NINERS STADIUM MANAGEMENT COMPANY
2 On October 5, 2023, Stadium Manager published the Notice Inviting Bids for the Project in the San Jose Mercury News publication. Notices were also emailed on October 2, 2023 to the Builders’ Exchange of Santa Clara County and Minority Business Consortium to communicate with their respective member communities regarding the solicitation for the Project.
Stadium Manager held a non-mandatory pre-bid conference on October 9, 2023 at 3:00 p.m. (PT) to provide an overview of the Project and answer any questions from prospective bidders. The RFB provided prospective bidders the option to schedule on-site visits to the Stadium.
Electronic bid submissions were due on or before October 30, 2023 at 3:00 p.m. (PT). Three bids were received on or before the closing due date and time from the following firms:
1. CWS Construction Group Inc. - $395,000
2. Devcon Construction, Inc. - $346,517
3. Giant Construction - $239,900
Public Bid Opening
A public bid opening was held on October 30, 2023, at 4:00 p.m. (PT). The RFB provided the public bid opening webcast information including a meeting ID and password for bidders to log on via Zoom to attend. Multiple callers were in attendance. Stadium Manager announced the receipt of the three bids on or before the due date and time, announced the name of the bidders and the base bid amounts and declared Giant Construction the apparent low bidder.
Stadium Manager validated that Giant Construction was responsive and responsible including contacting their existing and past customers for references.
The protest period ended on November 6, 2023. There were no protests.
Evaluation of Apparent Low Bidder
Stadium Manager reviewed the bid from Giant Construction and determined that the bidder was the lowest responsive and responsible bidder. Supporting documentation on the evaluation of bids has been provided.
Next Steps
The Project was approved as part of the FY23/24 SCSA Capital Expenditures budget. The current approved amount for this Project is $329,123.
Once Stadium Manager receives approval from the SCSA Board, a contract (included in the RFB) will be executed with Giant Construction, and a fully executed copy of the contract will be forwarded to the SCSA. In addition, Stadium Manager requests authorization to issue change orders up to $23,990 or 10% of the Project cost which will allow Stadium Manager to take timely administrative action if required and not delay completion of the Project.
Supporting documentation has been provided for review and approval. The cost for advertising the RFB in the San Jose Mercury News publication for one day is $216.94. Stadium Manager’s request to publish legal notices in the San Jose Mercury News for various solicitations,
3 including public works, was approved by the SCSA Board on July 13, 2021. This Project is a public works project.
Submitted By: __________________________________ Date: ___________________ Jenti Vandertuig, Procurement Director
11/29/2023
~
DocuSigned by:
~v~
A4B5666F5BF 14 7D ...
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-1- CONTRACT
CONTRACT
This CONTRACT, No. ________ is made and entered into this ____ day of _______, ______, by and between Forty Niners Stadium Management Company LLC, sometimes hereinafter called “Stadium Manager,” and _______________________________________________, sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:
a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Section (e), below, for the following Project:
LEVI’S STADIUM WOMEN’S LOCKER ROOM PROJECT
The Contractor and its surety shall be liable to the Stadium Manager for any damages arising as a result of the Contractor’s failure to comply with this obligation. a. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the Stadium Manager’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within one hundred-fifty (150) calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.
b. CONTRACT PRICE. The Stadium Manager shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of ____________________________________________________________________ Dollars ($_________________________________). Payment shall be made as set forth in the General Conditions.
c. LIQUIDATED DAMAGES. In accordance with Government Code Section 53069.85, it is agreed that the Contractor will pay the Stadium Manager the sum set forth in Section 00 73 13, Article 1.11 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the Stadium Manager may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents. d. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-2- LEVI’S STADIUM WOMEN’S LOCKER ROOM
PROJECT
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
General Requirements
Technical Specifications
Addenda
Plans and Specifications
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Procurement and Contract Process Integrity and Conflict of Interest Guidelines Levi’s Stadium Jobsite Rules
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.
e. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE . Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
f. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the General Conditions.
g. PREVAILING WAGES; PROOF OF COMPLIANCE . It shall be Contractor’s sole responsibility to comply with, and maintain adequate records of its adherence to, all applicable state prevailing wage requirement . Contractor is responsible for maintaining and providing the following documentation to Stadium Manager for review and approval within the timeframes specified below.
1. Division of Apprenticeship Standards (DAS) 140 Form (applicable if Contract Price is $30,000 or more). Contractor, on behalf of itself and its subcontractors, must provide a copy of DAS 140 forms filed with the appropriate apprenticeship committee(s) the earlier of Contractor’s first application for payment for Work performed under this Contract or ten (10) Days of Contract execution.
2. DAS 142 Form (applicable if Contract Price is $30,000 or more). Contractor, on behalf of itself and its subcontractors, must provide a copy of DAS 142 forms filed
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-3- LEVI’S STADIUM WOMEN’S LOCKER ROOM
PROJECT
with the appropriate apprenticeship committee(s) or evidence of an approved exemption with its first application for payment for Work involving an apprenticeable craft or trade classification – additional DAS 142 forms or evidence of approved exemptions must be provided following this initial submission with future applications for payment in the event those applications are for Work involving an apprenticeable craft or trade classification not covered under the first application for payment.
3. California Apprenticeship Council (CAC) Form CAC-2; Training Fee Contributions (applicable if Contract Price is $30,000 or more). Contractor, on behalf of itself and its subcontractors, must submit evidence of mandatory training contributions required under Labor Code section 1777.5, as it may be amended from time to time, via submission of completed Form CAC-2 and/or confirmation of payment to a valid union trust fund with each application for payment submitted to Stadium Manager.
4. Certified Payroll Records; Statement of Compliance. Contractor, on behalf of itself and its subcontractors, must submit complete payroll records on forms substantially similar to the Department of Industrial Relations Form A -1-131 with each application for payment submitted to Stadium Manager. Each set of certified payroll records submitted to Stadium Manager with any application for payment must be accompanied by a signed Statement of Compliance certifying the information on the certified payroll records is true and correct. For the period covered by any application for payment in which Contractor and its subcontractors did not perform Work, Contractor must additionally submit a signed Statement of Non-Performance certifying no work was performed. Contractors are advised the submission of electronic certified payroll records to the Department of Industrial Relations via the eCPR system is not an acceptable substitute to maintaining and providing full certified payroll records as required by this provision and applicable law.
5. Fringe Benefit Statement. Contractor, on behalf of itself and its subcontractors, must submit complete Fringe Benefit Statement(s) for the crafts and trade classifications utilized to perform the Work covered by any application for payment.
All Fringe Benefit Statements must be submitted with the application for payment to which each applies.
6. Demand for Compliance Recor ds. At any time during or subsequent to the full performance of the Work under this Contract and in addition to the obligations set forth above, Stadium Manager and/or the Santa Clara Stadium Authority may require Contractor to produce and or correct and re-submit any prevailing wage compliance records, which must be reviewed and approved by Stadium Manager and/or the Santa Clara Stadium Authority, prior to full release of payment.
7. Withholding for Non-Compliance. In the event Contractor or any subcontractor is found not to be in compliance with the foregoing requirements for any application for payment whether for progress payments or final payment, Stadium Manager has the right to withhold up to ten percent (10%) of the amount owed to Contractor under the affected application for payment until full compliance is achieved.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-4- LEVI’S STADIUM WOMEN’S LOCKER ROOM
PROJECT
Contractor acknowledges and agrees the foregoing amount is a reasonable estimate of the value of the documentation specified above.
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.
FORTY NINERS STADIUM [ INSERT NAME OF CONTRACTOR]
MANAGEMENT COMPANY LLC
By: By:
Peter Wilhelm
Chief Financial Officer Its:
Printed Name:
(CONTRACTOR’S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
SEAL AFFIXED, IF APPLICABLE)
END OF CONTRACT
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-5- LEVI’S STADIUM WOMEN’S LOCKER ROOM
PROJECT
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-6- 00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
1.1 Performance Bond.
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the Forty Niners Stadium Management Company LLC, (hereinafter referred to as “Stadium Manager”) has awarded to _________________________ (hereinafter referred to as the “Contractor”) an agreement for the Levi’s Stadium Retrofit Auxiliary Locker Room Project (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, __ ____________________, the undersigned Contractor and ________________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the Stadium Manager in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, i f the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the guarantee of all materials and workmanship; and shall indemnify and save harmless the Indemnified Parties as stipulated and defined in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by Stadium Manager in enforcing such obligation.
As a con dition precedent to the satisfactory completion of the C ontract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by Stadium Manager, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the Stadium Manager from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the Stadium Manager’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-7- 00 61 13 – BOND FORMS
Whenever Contractor shall be, and is declared by the Stadium Manager to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Stadium Manager’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the Stadium Manager , and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the Stadium Manager to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.
Surety expressly agrees that the Stadium Manager may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the Stadium Manager, when declaring the Contractor in default, notifies Surety of the Stadium Manager’s objection to Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
By their signatures hereunder, Surety and Contractor hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-8- 00 61 13 – BOND FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of ___________________________________________ process in California, if different ___________________________________________ from above)
(Telephone number of Surety ___________________________________________ and Agent or Representative for
service of process in California)
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-9- 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/s he/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-10- 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-11- 00 61 13 – BOND FORMS
1.2 Payment Bond (Labor and Materials).
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter designated as the “Stadium Manager”), by action taken or a resolution passed ___________________ , 20_____, has awarded to ________________________ hereinafter designated as the “Principal,” a contract for the work described as follows: the Levi’s Stadium Retrofit Auxiliary Locker Room Project (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the Stadium Manager in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any material s, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the Stadium Manager in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-12- 00 61 13 – BOND FORMS
otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or Stadium Manager and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100 , and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, inc luding but not limited to the provisions of Sections 2819 and 2845 of the California Civil Code.
By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-13- 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-14- 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
END OF PAYMENT BOND
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-15- 00 72 13 – GENERAL CONDITIONS
00 72 13 – GENERAL CONDITIONS
ARTICLE 1. DEFINED TERMS
Whenever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
A. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or a tidal wave.
B. Addenda -- Written or graphic instruments issued prior to the submission of Bids which clarify, correct, or change the Contract Documents.
C. Additional Work -- New or unforeseen work will be classified as “Additional Work” when the Stadium Manager’s Representative determines that it is not covered by the Contract.
D. Applicable Laws -- T he laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.
E. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices and other terms for the Work to be performed.
F. Bidder -- The individual or entity who submits a Bid directly to the Stadium Manager.
G. Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.
H. Change Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Contract Times as the result of a Contractor-claimed change to the Work. This term may also be referred to as a Change Order Proposal (“COP”), or Request for Change (“RFC”).
I. Claim -- A demand or assertion by the Stadium Manager or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.
J. Contract -- The entire integrated written agreement between the Stadium Manager and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents. The Contract supersedes prior
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-16- 00 72 13 – GENERAL CONDITIONS
negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.
K. Contract Documents -- The documents listed in Section 00 52 13, Article 5. Some documents provided by the Stadium Manager to the Bidders and Contractor, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.
L. Contract Price -- Amount to be paid by the Stadium Manager to the Contractor as full compensation for the performance of the Contract and completion of the Work, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs.
M. Contract Times -- The number of days or the dates stated in the Contract Documents to: achieve defined Milestones, if any; and to complete the Work so that it is ready for final payment.
N. Contractor -- The individual or entity with which the Stadium Manager has contracted for performance of the Work.
O. Contractor’s Designated On- Site Representative -- The Contractor’s Designated On-Site Representative will be as identified during the preconstruction conference pursuant to Article 3 in Section 00 72 13 and shall not be changed without prior written consent of the Stadium Manager.
P. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported by documented proof that Contractor made every effort to obtain such materials from all available sources; (b) such shortage is due to the fact that such materials are not physically available from single or multiple sources or could have been obtained only at exorbitant prices entirely inconsistent with current and standard rates taking into account the quantities involved and the usual industry practices in obtaining such quantities; and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated by Contractor at the time it submitted its bid or entered the Contract. Market fluctuations in prices of materials, whether or not resulting from a Force Majeure Event, does not constitute a Critical Supply Shortage.
Q. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full compensation to the Contractor due to the Stadium Manager’s unreasonable delay to the Project that was not contemplated by the parties.
R. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
S. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.
T. Demobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at the Site.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-17- 00 72 13 – GENERAL CONDITIONS
U. Drawings -- That part of the Contract Documents prepared by the Stadium Manager which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined.
V. Effective Date of the Contract -- The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it means the date on which the Contract is signed and delivered by the last of the two parties to sign and deliver.
W. Force Majeure Event -- An event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and other organized labor action occurring at the Site and the effects thereof on the Work, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its Subcontractors, of every tier, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (6) a Critical Supply Shortage. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of governmental authorities with jurisdiction over the Project.
X. Green Book -- The current edition of the Standard Specifications for Public Works Construction.
Y. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended from time to time or, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a class I, class II, or class III disposal site in accordance with provisions of existing law, whichever is more restrictive.
Z. Holiday – The Holidays occur on:
New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
Day After Christmas – December 26
New Year’s Eve – December 31
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-18- 00 72 13 – GENERAL CONDITIONS
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both Holidays.
AA. Indemnified Parties – The Stadium Manager, the Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, employees, agents and authorized volunteers, each tenant and event promoter of Levi’s Stadium, and any mortgagee, bond trustee or other financial institution from time to time holding a line or indenture upon an interest in Levi’s Stadium, and each of them.
BB. Notice of Award -- The written notice by the Stadium Manager to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, the Stadium Manager will sign and deliver the Contract.
CC. Notice of Completion -- The form which may be executed by the Stadium Manager and recorded by the county where the Project is located constituting final acceptance of the Project.
DD. Notice to Proceed -- A written notice given by the Stadium Manager to Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Times will commence to run.
EE. Project -- The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part.
FF. Recyclable Waste Materials -- Materials removed from the Site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock.
GG. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to facilitate scheduled performance of related construction activities.
HH. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.
II. Specifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.
JJ. Stadium Manager -- The Forty Niners Stadium Management Company LLC.
KK. Stadium Manager’s Representative -- The individual, partnership, corporation, joint venture, or other legal entity named as such in Section 00 73 13, Article 1.1. or any succeeding entity designated by the Stadium Manager acting either directly or through properly authorized agents, such agents acting severally within the scope of the particular duties entrusted to them. On all questions concerning the
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-19- 00 72 13 – GENERAL CONDITIONS
acceptance of materials, machinery, the classifications of material, the execution of work, conflicting interest of the contractors performing related work and the determination of costs, the decision of the Stadium Manager’s Representative, duly authorized by the Stadium Manager, shall be binding and final upon both parties.
LL. Stop Payment Notice -- A written notice as defined in Civil Code Section 8044.
MM. Subcontractor -- An individual or entity other than a Contractor having a contract with any other entity than the Stadium Manager for performance of any portion of the Work at the Site.
NN. Submittal -- Written and graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.
OO. Successful Bidder -- The Bidder submitting a responsive Bid to whom the Stadium Manager makes an award.
PP. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in the Work.
QQ. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.
RR. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by the Contractor in its bid or as adjusted in accordance with the Contract Documents.
SS. Warranty -- A written guarantee provided to the Stadium Manager by the Contractor that the Work will remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this State, whichever is longer.
TT. Work -- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.
ARTICLE 2. CONTRACT DOCUMENTS
A. Contract Documents. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-20- 00 72 13 – GENERAL CONDITIONS
B. Interpretations. The Contract Documents are intended to be fully cooperative and complementary. If the Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Stadium Manager’s Representative in writing. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:
1. Change Orders, most recent first
2. Addenda, most recent first
3. Procurement and Contract Process Integrity and Conflict of Interest Guidelines
4. Levi’s Stadium Jobsite Duties
5. Special Conditions
6. General Requirements
7. Technical Specifications
8. Plans (Contract Drawings)
9. Contract
10. General Conditions
11. Instructions to Bidders
12. Notice Inviting Bids
13. Contractor’s Bid Forms
14. Standard Specifications for Public Works Construction (Sections 1-9 Excluded)
15. Standard Drawings
16. Reference Documents
With reference to the Drawings, the order of precedence shall be as follows:
1. Figures govern over scaled dimensions
2. Detail drawings govern over general drawings
3. Addenda or Change Order drawings govern over Contract Drawings
4. Contract Drawings govern over Standard Drawings
5. Contract Drawings govern over Shop Drawings
C. Conflicts in Contract Documents. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard, higher quality, and most expensive shall always apply.
D. Organization of Contract Documents. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Project Work among subcontractors or in establishing the extent of Work to be performed by any trade.
ARTICLE 3. PRECONSTRUCTION AND CONSTRUCTION COMMUNICATION Before any Work at the site is started, a conference attended by the Stadium Manager, Contractor, Stadium Manager’s Representative, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to herein, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records.
At this conference the Stadium Manager and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-21- 00 72 13 – GENERAL CONDITIONS
under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party.
The authorized representatives of Stadium Manager, Contractor and others as appropriate must meet weekly at the Project site at a location designated by Stadium Manager to keep abreast of construction activities and maintain familiarity with the progress of the Work as well as address any other Project related issues. Stadium Manager may waive the scheduled weekly meeting in Stadium Manager’s discretion. Contractor is responsible for writing and distributing meeting minutes, which shall at a minimum include information regarding the following: (1) Project name and location; (2) Name of preparer of the minutes and position in Contractor’s organization; (3) Meeting number, time and date; (4) List of attendees and what entity each represents; (5) total contract time elapsed since Notice to Proceed – to be reported in calendar days; (6) anticipated date of completion of the Work; (6) a summary of each item addressed in the meeting organized chronologically based on when it was discussed during the meeting; and (7) any other information Stadium Manager deems appropriate to be included in the meeting minutes. The meeting minutes shall be submitted by Contractor to Stadium Manager for review and verification within two (2) business days of the date of the meeting. Stadium Manager may direct Contractor to revise the meeting minutes to the extent there are factual inaccuracies or inconsistencies therein.
ARTICLE 4. CONTRACT DOCUMENTS: COPIES & MAINTENANCE
Contractor will be furnished free of charge, an electronic copy of the Contract Documents.
Contractor shall maintain a clean, undamaged set of Contract Documents, including submittals, at the Project site.
ARTICLE 5. EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITE OF WORK A. Examination of Contract Documents. Before commencing any portion of the Work, Contractor shall again carefully examine all applicable Contract Documents, the Project site, and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Stadium Manager’s Representative of any potential error, inconsistency, ambiguity, conflict, or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements.
B. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict, or lack of detail or explanation, the Stadium Manager’s Representative will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-22- 00 72 13 – GENERAL CONDITIONS
the requirement to comply with all applicable laws, ordinances, rules and regulations, the Stadium Manager’s Representative may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.
ARTICLE 6. MOBILIZATION
A. When a bid item is included in the Bid Form for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate (“Initial Mobilization”). When no bid item is provided for “Initial Mobilization,” payment for such costs will be deemed to be included in the other items of the Work.
B. Payment for Initial Mobilization based on the lump sum provided in the Bid Form, which shall constitute full compensation for all such Work. No payment for Initial Mobilization will be made until all of the listed items have been completed to the satisfaction of the Stadium Manager’s Representative. The scope of the Work included under Initial Mobilization shall include, but shall not be limited to, the following principal items:
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project site of all Contractor’s plant and equipment required for the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, if applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary, and the Stadium Manager’s Representative (if specified), complete, with all specified furnishings and utility services.
7. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.
8. Arranging for and erection of Contractor’s work and storage yard.
9. Posting all OSHA required notices and establishment of safety programs per Cal- OSHA.
10. Full-time presence of Contractor’s superintendent at the job site as required herein.
11. Submittal of Construction Schedule as required by the Contract Documents.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-23- 00 72 13 – GENERAL CONDITIONS
ARTICLE 7. EXISTENCE OF UTILITIES AT THE WORK SITE
A. The Stadium Manager has endeavored to determine the existence of utilities at the Project site from the records of the owners of known utili ties in the vicinity of the Project. The positions of these utilities as derived from such records are shown on the Plans.
B. Unless indicated otherwise on the Plans and Specifications, no excavations were made to verify the locations shown for underground utilities. The service connections to these utilities are not shown on the Plans. Water service connections may be shown on the Plans showing general locations of such connections. It shall be the responsibility of the Contractor to determine the exact location of all service connections. The Contractor shall make its own investigations, including exploratory excavations, to determine the locations and type of service connections, prior to commencing Work which could result in damage to such utilities. The Contractor shall immediately notify the Stadium Manager in writing of any utility discovered in a different position than shown on the Plans or which is not shown on the Plans.
C. If applicable, all water meters, water valves, fire hydrants, electrical uti lity vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to final grade by the Contractor. Locations of existing utilities shown on the Plans are approximate and may not be complete. The Contractor shall be responsible for coordinating its Work with all utility companies during the construction of the Work.
D. Notwithstanding the above, pursuant to Section 4215 of the Government Code, the Stadium Manager has the responsibility to identify, with reasonable accuracy, main or trunkline facilities on the plans and specifications. In the event that main or trunkline utility facilities are not identified with reasonable accuracy in the plans and specifications made a part of the invitation for Bids, the Stadium Manager shall assume the responsibility for their timely removal, relocation, or protection.
E. Contractor, except in an emergency, shall contact the appropriate regional notification center, California Underground Service Alert at 811 or 1- 800-227-2600 or on-line at www.digalert.org at least two working days prior to commencing any excavation if the excavation will be performed in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by the Stadium Manager, and obtain an inquiry identification number from that notification center. No excavation shall be commenced or carried out by the Contractor unless such an inquiry identification number has been assigned to the Contractor or any subcontractor of the Contractor and the Stadium Manager has been given the identification number by the Contractor.
ARTICLE 8. SOILS INVESTIGATIONS
A. Reports and Drawings. The Special Conditions identify:
1. those reports known to the Stadium Manager of e xplorations and tests of subsurface conditions at or contiguous to the site; and
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-24- 00 72 13 – GENERAL CONDITIONS
2. those drawings known to the Stadium Manager of physical conditions relating to existing surface or subsurface structures at the site (except Underground Facilities).
B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may rely upon the accuracy of the “technical data” contained in such reports and drawings, which were expressly not created or obtained to evaluate or assist in the evaluation of constructability, and are not Contract Documents. Contractor shall make its own interpretation of the “technical data” and shall be solely responsible for any such interpretations. Except for reliance on the accuracy of such “technical data,” Contractor may not rely upon or make any claim against the Stadium Manager or Stadium Manager ’s Representative, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes, including without limitation any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or
2. other data, interpretations, opinions, conclusions and information contained in such reports or shown or indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any “technical data” or any such other data, interpretations, opinions, or information.
ARTICLE 9. CONTRACTOR’S SUPERVISION
Contractor shall continuously keep at the Project site, a competent and experienced full -time Project superintendent acceptable to the Stadium Manager. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project.
ARTICLE 10. WORKERS
A. Contractor shall at all times enforce strict discipline and good order among i ts employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.
B. Any person in the employ of the Contractor whom the Stadium Manager may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project.
ARTICLE 11. INDEPENDENT CONTRACTORS
Contractor shall be an independent contractor for the Stadium Manager and not an employee.
Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of Stadium Manager and are not entitled to benefits of any kind normally provided employees of Stadium Manager , including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-25- 00 72 13 – GENERAL CONDITIONS
ARTICLE 12. SUBCONTRACTS
A. Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of the Work. Contractor shall be as fully responsible to the Stadium Manager for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the Stadium Manager.
B. The Stadium Manager reserves the right to accept all subcontractors. The Stadium Manager’s acceptance of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.
C. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code Section 4100 et seq.
ARTICLE 13. VERIFICATION OF EMPLOYMENT ELIGIBILITY
By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub- subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the Stadium Manager to terminate the Contract for cause: (1) failure of the Contractor or its subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.
ARTICLE 14. REQUESTS FOR SUBSTITUTION
A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referenced herein.
B. Pursuant to Public Contract Code Section 3400(b), the Stadium Manager may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in the Contract
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-26- 00 72 13 – GENERAL CONDITIONS
Documents. However, the Stadium Manager has adopted uniform standards for certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than the amount of calendar days prior to the bid submission deadline set forth in the Notice Inviting Bids as it may be amended. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract.
If a substitution request is rejected by the Stadium Manager, the Contractor shall provide the material, method or service specified herein. The Stadium Manager shall not be responsible for any costs incurred by the Contractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Stadium Manager’s Representativ e has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a mi nimum, the following information:
1. A signed Request Approved Equals Form from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the form.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.
3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the Contract.
4. Information detailing the durability and lifecycle costs of the proposed substitution.
F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Stadium Manager’s Representative is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.
H. The Contractor shall bear the costs of all Stadium Manager work associated with the review of substitution requests.
I. If substitution requests approved by the Stadium Manager’s Representative require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-27- 00 72 13 – GENERAL CONDITIONS
ARTICLE 15. SHOP DRAWINGS
A. Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in its own Work or in that of any other contractor, subcontractor, or worker on the Project, six (6) copies of all shop drawings, calculations, schedules, and materials list, and all other provisions required by the Contract Documents. Contractor shall sign all submi ttals affirming that submittals have been reviewed and approved by Contractor prior to submission to Stadium Manager’s Representative. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the transmittal letter of the submittal.
B. Contractor shall make any corrections required by the Stadium Manager’s Representative, and file with the Stadium Manager’s Representative six (6) corrected copies each, and furnish such other copies as may be needed for completion of the Work. Stadium Manager’s Representative’s acceptance of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called Stadium Manager's Representative’s attention to such deviations at time of submission and has secured the Stadium Manager's Representative’s written acceptance. Stadium Manager's Representative’s acceptance of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings.
ARTICLE 16. SUBMITTALS
A. Contractor shall furnish to the Stadium Manager’s Representative for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the Contract Documents. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract.
B. Contractor will provide samples and submittals, together with catalogs and supporting data required by the Stadium Manager’s Representative, to the Stadium Manager’s Representative within a reasonable time period to provide for adequate review and avoid delays in the Work.
C. These requirements shall not authorize any extension of time for performance of this Contract. Stadium Manager’s Representative will check and approve such samples, but only for conformance with design concept of work and for compliance with information given in the Contract Documents. Work shall be in accordance with approved samples and submittals.
ARTICLE 17. MATERIALS
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-28- 00 72 13 – GENERAL CONDITIONS
B. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.
C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the W ork and shall be stored properly and protected a s required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work.
D. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier.
Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the Stadium Manager free from any claims, liens, or charges.
E. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of the Stadium Manager or any independent contractor.
F. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the Stadium Manager shall not be liable for Contractor’s failure to so. No additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Form, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Stadium Manager’s Representative for consideration before proceeding with the Work.
ARTICLE 18. PERMITS AND LICENSES
A. Contractor shall obtain all necessary permits and licenses for the construction of the Project, including encroachment permits, and shall pay all fees required by law and shall comply with all laws, ordinances, rules and regulations relating to the Work and to the preservation of public health and safety. Before acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the Stadium Manager.
B. On some projects, t he Bid Form contains an allowance for the Contractor’s cost of acquiring all permits and construction inspection fees that may be charged to the Contractor by the Agency of Jurisdiction. The allowance is included within the Bid Form to eliminate the need by bidders to research or estimate the costs of permits and construction inspection fees prior to submitting a bid. The allowance is specifically intended to account for the costs of permits and construction inspection fees charged by the local Agency of Jurisdiction only. No other costs payable by Contractor to the Agency of Jurisdiction are included within the allowance. Payment by Stadium Manager to Contractor under the Permit and Inspection Allowance Bid Item shall be made based on actual cost receipts only and in accordance with the provisions of these specifications.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-29- 00 72 13 – GENERAL CONDITIONS
ARTICLE 19. TRENCHES
A. Trenches Five Feet or More in Depth. Contractor shall submit to the Stadium Manager’s Representative at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Stadium Manager’s Representative. Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet. If the Work involves excavating trenches or other excavations that extend deeper than four feet below the surface, Contractor shall promptly, and before the excavation is further disturbed, notify the Stadium Manager in writing of any of the following conditions:
1. Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
2. Subsurface or latent physical conditions at the site differing from those indicated.
3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract
The Stadium Manager shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a change order under the procedures described in the Contract Documents.
In the event that a dispute arises between the Stadium Manager and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-30- 00 72 13 – GENERAL CONDITIONS
ARTICLE 20. TRAFFIC CONTROL
A. Traffic control plan(s) for the Work may be required by the Agency(s) of Jurisdiction.
Traffic control plans, if required, shall be prepared at Contractor’s expense, and traffic control shall be performed at Contractor’s expense in accordance with the requirements of the Agency(s) of Jurisdiction. If a Permit and Inspection Allowance is included within the Bid Form, it includes the cost of required traffic control permit(s) by the Agency(s) of Jurisdiction only. The Permit and Inspection Allowance does not include costs for preparation of any required traffic control plans, implementation of any traffic control requirements or for any traffic signal services that may be required.
Costs for traffic control plans, implementation of traffic control, or traffic signal services required by the Agency(s) of Jurisdiction shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the project for approval prior to starting work.
C. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction. Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right-of- ways after working hours unless otherwise approved by the Stadium Manager’s Representative.
ARTICLE 21. DIVERSION OF RECYCLABLE WASTE MATERIALS
In compliance with the applicable Stadium Manager’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests.
Contractor shall complete and execute any certification forms required by Stadium Manager or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.
ARTICLE 22. REMOVAL OF HAZARDOUS MATERIALS
Should Contractor encounter material reasonably believed to be polychlorinated biphenyl (PCB) or other toxic wastes and hazardous materials which have not been rendered harmless at the Project site, the Contractor shall immediately stop work at the affected Project site and shall report
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-31- 00 72 13 – GENERAL CONDITIONS
the condition to the Stadium Manager in writing. The Stadium Manager shall contract for any services required to directly remove and/or abate PCBs and other toxic wastes and hazardous materials, if required by the Project site(s), and shall not require the Contractor to subcontract for such services. The Work in the affected area shall not thereafter be resumed except by written agreement of the Stadium Manager and Contractor.
ARTICLE 23. SANITARY FACILITIES
Contractor shall coordinate with the Stadium Manager for access and use of stadium restroom facilities during performance of the Work on the Project site.
ARTICLE 24. AIR POLLUTION CONTROL
Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes.
All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.
ARTICLE 25. LAYOUT AND FIELD ENGINEERING
All field engineering required for laying out the Work and establishing grades for earthwork operations shall be furnished by the Contractor at its expense.
ARTICLE 26. TESTS AND INSPECTIONS
A. If the Contract Documents, the Stadium Manager’s Representative, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or approved, Contractor shall provide the Stadium Manager’s Representative at least four (4) calendar days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the Stadium Manager, Contractor shall promptly inform the Stadium Manager of the date fixed for such inspection. Required certificates of inspection (or similar) shall be secured by Contractor. Costs for Stadium Manager testing and Stadium Manager inspection shall be paid by the Stadium Manager. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.
B. If any Work is done or covered up without the required testing or approval , the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.
C. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the Stadium Manager, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.
D. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the Stadium Manager so that the Stadium Manager may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-32- 00 72 13 – GENERAL CONDITIONS
E. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the Stadium Manager, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.
F. Reexamination of Work may be ordered by the Stadium Manager. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the Stadium Manager shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.
ARTICLE 27. PROTECTION OF WORK AND PROPERTY
A. The Contractor shall be responsible for all damages to persons or property that occurs as a result of the Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final Acceptance by the Stadium Manager. All Work shall be solely at the Contractor’s risk.
Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.
B. In an emergency affecting safety of life or of work or of adjoining property, Contractor, without special instruction or authorization from the Stadium Manager’s Representative, is hereby permitted to act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if so authorized or instructed by the Stadium Manager’s Representative or the Stadium Manager . Any compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by the Stadium Manager and the Contractor.
ARTICLE 28. CONTRACTOR’S MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.
ARTICLE 29. AUTHORIZED REPRESENTATIVES
The Stadium Manager shall designate representatives, who shall have the right to be present at the Project site at all times. The Stadium Manager may designate an inspector who shall have the right to observe all of the Contractor’s Work. The inspector shall not be responsible for the Contractor’s failure to carry out the Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.
ARTICLE 30. HOURS OF WORK
A. As provided in Article 3 (commencing at Section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-33- 00 72 13 – GENERAL CONDITIONS
legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided. Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half times the basic rate of pay.
B. The Contractor and every subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the Stadium Manager and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.
C. The Contractor shall pay to the Stadium Manager a penalty of twenty -five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Article 3 (commencing at Section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
D. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to the Stadium Manager.
E. No Work will be allowed on the Project site 48 hours prior and 24 hours after any event with a projected attendance greater than 10,000 people without prior written approval from the Stadium Manager.
F. Stadium Manager will provide inspection during normal working hours from 7:00 a.m. to 3:30 p.m. Monday through Friday. Inspection before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two days’ notice for review and approval. Upon written request and approval the 8.5 hour working day may be changed to other limits subject to city/county ordinance.
G. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on the Stadium Manager - observed holidays, unless otherwise approved by the Stadium Manager:
1. Powered Vehicles
2. Construction Equipment
3. Loading and Unloading Vehicles
4. Domestic Power Tools
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-34- 00 72 13 – GENERAL CONDITIONS
ARTICLE 31. PAYROLL RECORDS; LABOR COMPLIANCE
A. Pursuant to Labor Code Section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury.
B. In accordance with Labor Code Section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
C. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the Stadium Manager. Contractor shall defend, indemnify and hold the Indemnified Parties free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.
D. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the Stadium Manager. The Contractor shall also provide the following:
1. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representat ive on request.
2. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.
E. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
F. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the Stadium Manager , the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-35- 00 72 13 – GENERAL CONDITIONS
name, address and social security number. The name and address of the Contractor awarded the Contract or performing the contract shall not be marked or obliterated.
G. In addition to requirements associated with submission of labor compliance records under state laws and regulations, the Contractor and each of its subcontractors performing work on the Project shall submit the labor compliance records required herein via the LCPTracker platform as directed by the Stadium Manager.
H. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such 10- day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the Stadium Manager for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payment then due.
I. The responsibility for compliance with this Article shall rest upon the Contractor.
ARTICLE 32. PREVAILING RATES OF WAGES
A. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.
The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the Stadium Manager’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the Indemnified Parties free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
B. The Contractor shall forfeit as a penalty to the Stadium Manager not more than Two Hundred Dollars ($200.00), pursuant to Labor Code Section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the Department of Industrial Relations for such work or craft in which such worker is employed for any public work done under the Contract by it or by any subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-36- 00 72 13 – GENERAL CONDITIONS
which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.
C. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
ARTICLE 33. PUBLIC WORKS CONTRACTOR REGISTRATION
Pursuant to Labor Code Sections 1725.5 and 1771.1, the Contractor and its subcontractors must be registered with the Department of Industrial Relations prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR. Contractor shall maintain a current registration for the duration of the Project. Contractor shall further include the requirements of Labor Code Sections 1725.5 and 1771.1 in any subcontract and ensure that all subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to wor k performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
ARTICLE 34. EMPLOYMENT OF APPRENTICES
A. Contractor and all subcontractors shall comply with the requirements of Labor Code Sections 1777.5 and 1777.6 in the employment of apprentices.
B. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, S an Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
C. Knowing violations of Labor Code Section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non -compliance pursuant to Labor Code Section 1777.7.
D. The responsibility for compliance with this Article shall rest upon the Contractor.
ARTICLE 35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.
Employment Eligibility; Contrac tor. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-37- 00 72 13 – GENERAL CONDITIONS
of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time. Such requirements and restrictions include, but are not limited to, examination and retention of documentation confirming the identity and immigration status of each employee of the Contractor. Contractor also verifies that it has not committed a violation of any such law within the five (5) years immediately preceding the date of execution of this Contract, and shall not violate any such law at any time during the term of the Contract.
Contractor shall avoid any violation of any such law during the term of this Contract by participating in an electronic verification of work authorization program operated by the United States Department of Homeland Security, by participating in an equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, or by some other legally acceptable method. Contractor shall maintain records of each such verification, and shall make them available to the Stadium Manager or its representatives for inspection and copy at any time during normal business hours.
The Stadium Manager shall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for or referred to herein.
Employment Eligibility; Subcontractors, Sub-subcontractors and Consultants. To the same extent and under the same conditions as Contractor, Contractor shall require all of its subcontractors, sub-subcontractors and consultants performing any part of the Work or of this Contract to make the same verifications and comply with all requirements and restrictions provided for herein.
Employment Eligibility; Failure to Comply. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor, and understands that any of the following shall be grounds for the Stadium Manager to terminate the Contract for cause:
(1) failure of Contractor or its subcontractors, sub- subcontractors or consultants to meet any of the requirements provided for herein; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.
ARTICLE 36. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any money for performing work as a subcontractor on a public works contract. Any money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the Stadium Manager. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.
ARTICLE 37. LABOR/EMPLOYMENT SAFETY
The Contractor shall comply with all applicable laws and regulations of the federal, state, and local government, including Cal/OSHA requirements and requirements for verification of employees’ legal right to work in the United States.
The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the availability of emergency medical services
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-38- 00 72 13 – GENERAL CONDITIONS
for its employees in accordance with California Code of Regulations, Title 8, Section 1512.
The Contractor shall submit the Illness and Injury Prevention Program and a Project site specific safety program to the Stadium Manager prior to beginning Work at the Project site. Contractor shall maintain a confined space program that meets or exceeds the Stadium Manager Standards.
Contractor shall adhere to the Stadium Manager’s lock out tag out program.
ARTICLE 38. INSURANCE
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain all of the insurance described in this Article. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the Stadium Manager that it has secured all insurance required hereunder. Contractor shall cause each subcontractor to purchase and maintain such required insurance. Contractor is also responsible for assuring that all subcontractors’ insurance policies required herein comply with the additional insured, primary and non-contributory and waiver of subrogation requirements. Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the Stadium Manager that the subcontractor has secured all insurance required under this Article. Failure to provide and maintain all required insurance shall be grounds for the Stadium Manager to terminate this Contract for cause. Contractor shall furnish Stadium Manager with original certificates of insurance and endorsements effective coverage required by this Contract on forms satisfactory to the Stadium Manager. If requested by Stadium Manager, Contractor shall provide Stadium Manager with certificates of insurance and additional insured, primary and non- contributory and waiver of subrogation endorsements for the insurance requi red for all subcontractors. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms acceptable to the Stadium Manager. All certificates and endorsements must be received and approved by the Stadium Manager before Work commences.
A. Additional Insureds; Waiver of Subrogation . The Stadium Manager , its officials, officers, employees, agents and authorized volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies of Commercial General Liability and Automobile Liability insurance using, for Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20 10 07 04 and 20 37 07 04 (or endorsements providing the exact same coverage, including completed operations), and, for subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same coverage). The Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, employees, agents and authorized volunteers shall be named as additional insureds on Contractor’s and its subcontractors’ policy/ies of Automobile Liability insurance and Commercial General Liability insurance. Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, all available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as Additional Insureds herein.
Contractor and its insurance carriers shall provide a Waiver of Subrogation in favor of all additional insured parties noted above.
B. Workers’ Compensation Insurance. The Contractor shall provide workers’ compensation insurance for all of the employees engaged in Work under this Contract,
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-39- 00 72 13 – GENERAL CONDITIONS
on or at the Site, and, in case of any sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of Section 3700 of the Labor Code. The Contractor shall file with the Stadium Manager certificates of his insurance protecting workers. Company or companies providing insurance coverage shall be acceptable to the Stadium Manager, if in the form and coverage as set forth in the Contract Documents.
C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability Insurance, including Occupational Disease, in the amount of at least one million dollars ($1,000,000.00) per person per accident. Contractor shall provide Stadium Manager with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the Stadium Manager.
D. Commercial General Liability Insurance . Contractor shall provide “occurrence” form Commercial General Liability insurance coverage at least as broad as the most current ISO CGL Form 00 01, including but not limited to, premises liability, contractual liability, products/completed operations, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Site, or the performance of its obligations hereunder. The policy shall not contain any exclusion contrary to this Contract including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured against another. Policy limits shall not be less than $3,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Defense costs shall be paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the Stadium Manager, and shall not preclude the Stadium Manager from taking such other actions available to the Stadium Manager under other provisions of the Contract Documents or law. The insurance requirements set forth in minimum amounts shall not be construed to relieve Contractor for liability in excess of such coverage, nor shall it preclude Stadium Manager from taking such other actions as is available to it under any other provisions of the Contract Documents. To the extent Contractor maintains insurance greater than these minimum requirements,
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-40- 00 72 13 – GENERAL CONDITIONS
Contractor agrees that such insurance shall be applicable to any of Contractor’s liability obligations under the Contract Documents.
2. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non- owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions relating to liability for injury to or death of persons and damage to property.
4. I f the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the Stadium Manager may require additional coverage to be purchased by Contractor to restore the required limits.
Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents and shall be at least as broad as the primary coverage it supplements.
5. All policies of general liability insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.
E. Automobile Liability Insurance. Contractor shall provide “occurrence” form Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least, one million dollars ($1,000,000) per accident for bodily injury and property damage. Such insurance shall provide coverage with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible, in a form and with insurance companies acceptable to the Stadium Manager. All policies of automobile insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.
F. Contractor’s Equipment Insurance . Contractor shall provide Contractor’s Equipment Insurance applying to loss or damage on an “all risk” basis to any equipment, small tools, or other machinery whether owned, leased, rented, borrowed or otherwise in the care, custody and control of the Contractor for use in the performance of Work. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-41- 00 72 13 – GENERAL CONDITIONS
ARTICLE 39. FORM AND PROOF OF CARRIAGE OF INSURANCE
A. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the Stadium Manager’s Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self - insured retentions must be declared by the Contractor. At the election of the Stadium Manager the Contractor shall either 1) reduce or eliminate such deductibles or self - insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. If umbrella or excess liability coverage is used to meet any required limit(s) specified herein, the Contractor shall provide a “follow form” endorsement satisfactory to the Stadium Manager indicating that such coverage is subject to the same terms and conditions as the underlying liability policy.
B. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or cancelled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the Stadium Manager; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the Stadium Manager, its officials, officers, agents, employees, and volunteers.
C. The Certificates(s) and policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier(s) that it shall provide no less than thirty (30) days written notice be given to the Stadium Manager prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the Stadium Manager may terminate the Contract or stop the Work in accordance with the Contract Documents, unless the Stadium Manager receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original pol icies, including all endorsements and attachments thereto evidencing coverage’s set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Site, or commence operations under this Contra ct until the Stadium Manager has been furnished original Certificate(s) of Insurance and certified original copies of endorsements or policies of insurance including all endorsements and any and all other attachments as required in this Article. The origi nal endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.
D. The Certificate(s) of Insurance, policies and endorsements shall so covenant and shall be construed as primary, and the Stadium Manager’s insurance and/or deductibles and/or self -insured retentions or self -insured programs shall not be construed as contributory.
E. Stadium Manager reserves the right to adjust the monetary limits of insurance coverages during the term of this Contract including any extension thereof if, in the Stadium Manager’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-42- 00 72 13 – GENERAL CONDITIONS
F. Contractor shall report to the Stadium Manager, in addition to the Contractor’s insurer, any and all insurance claims submitted by the Contractor in connection with the Work under this Contract.
ARTICLE 40. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
A. Time for Completion/Liquidated Damages. Time is of the essence in the completion of the Work. Work shall be commenced within fourteen (14) calendar days of the date stated in the Stadium Manager ’s Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The Stadium Manager is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the Stadium Manager’s receipt or acceptance of the Contractor’s proposed earlier completion date. Furthermore, Contractor shall not, under any circumstances, receive additional compensation from the Stadium Manager (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date. If the Work is not completed as stated in the Contract Documents, it is understood that the Stadium Manager will suffer damage. In accordance with Government Code Section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the Stadium Manager as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.
B. Inclement Weather. Contractor shall abide by the Stadium Manager's Representative’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule.
C. Extension of Time. Contractor shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its subcontractors or suppliers).
Contractor shall within five (5) Days of identifying any such delay notify the Stadium Manager in writing of causes of delay. The Stadium Manager shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Time extensions to the Project shall be requested by the Contractor as they occur and without delay. No delay claims shall be permitted unless the event or occurrence delays the completion of the Project beyond the Contract completion date.
D. No Damages for Reasonable Delay. The Stadium Manager’s liability to Contractor for delays for which the Stadium Manager is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the Stadium Manager be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable Stadium Manager delay, including delays caused by items that are the responsibility of the Stadium Manager pursuant to Government Code Section 4215, shall be based on
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-43- 00 72 13 – GENERAL CONDITIONS
actual costs only, no proportions or formulas shall be used to calculate any delay damages.
ARTICLE 41. COST BREAKDOWN AND PERIODIC ESTIMATES
Contractor shall furnish on forms Approved by the Stadium Manager:
A. Within ten (10) Days of Notice to Proceed with the Contract, a detailed estimate giving a complete breakdown of the Contract price, if the Contract amount is a lump sum.
B. A monthly itemized estimate of Work done for the purpose of making progress payments. In order for the Stadium Manager to consider and evaluate each progress payment application, the Contractor shall submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) Day of the following month.
C. Contractor shall submit, with each of its payment requests, an adjusted list of actual quantities, verified by the Stadium Manager’s Representative, for unit price items listed, if any, in the Bid Form.
D. Following the Stadium Manager’s Acceptance of the Work, the Contractor shall submit to the Stadium Manager a written statement of the final quantities of unit price items for inclusion in the final payment request.
E. The Stadium Manager shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.
Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.
ARTICLE 42. PROGRESS ESTIMATES AND PAYMENT
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to Stadium Manager’s Representative a payment request which shall set forth in detail the value of the Work done for the period beginning with the date work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include any amount earned for authorized extra work. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the Stadium Manager has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified in the N otice Inviting Bids.
From the remainder a further deduction may be made in accordance with Section B below. The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request.
B. The Stadium Manager may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in his judgment may be necessary to cover:
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-44- 00 72 13 – GENERAL CONDITIONS
1. Payments which may be past due and payable for just claims against Contractor or any subcontractors for labor or materials furnished in and about the performance of work on the Project under this Contract.
2. Defective work not remedied.
3. Failure of Contractor to make proper payments to his subcontractor or for material or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the Stadium Manager for claims against Contractor.
7. Failure of Contractor to keep the record (“as-built”) drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Failure to comply with and timely submit all necessary prevailing wage compliance documentation as required under the Contract Documents.
10. Site cleanup.
11. Failure to comply with Contract Documents.
12. Liquidated damages.
13. Legally permitted penalties.
C. The Stadium Manager may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with the exception of subsections (B)(1), (3), and (5) of this Article, which must be retained or applied in accordance with applicable law. In so doing, the Stadium Manager shall be deemed the agent of Contractor and any payment so made by the Stadium Manager shall be considered as a payment made under contract by the Stadium Manager to Contractor and the Stadium Manager shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The Stadium Manager will render Contractor a proper accounting of such funds disbursed on behalf of Contractor.
D. Upon receipt, the Stadium Manager’s Representative shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) Days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The Stadium Manager shall make the progress payment within 30 calendar days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code Section 8132. The number of days available to the
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-45- 00 72 13 – GENERAL CONDITIONS
Stadium Manager to make a payment without incurring interest pursuant to this paragraph shall be reduced by the number of days by which the Stadium Manager’s Representative exceeds the seven (7) Day requirement.
E. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the Stadium Manager.
ARTICLE 43. SECURITIES FOR MONEY WITHHELD
Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor may request the Stadium Manager to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the Stadium Manager to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the Stadium Manager or with a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in Section 22300 of the Public Contract Code.
ARTICLE 44. CHANGES AND EXTRA WORK.
A. Contract Change Orders.
1. The Stadium Manager, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and the Contract Price and Contract Time shall be adjusted accordingly. Except as otherwise provided herein, all such changes in the Work shall be authorized by Change Order, and shall be performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in the Contract Price or the Contract Time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
2. Contractor shall promptly execute changes in the Work as directed in writing by the Stadium Manager even when the parties have not reached agreement on whether the change increases the scope of Work or affects the Contract Price or Contract Time. All claims for additional compensation to the Contractor shall be presented in writing. No claim will be considered after the Work in question has been done unless a written Change Order has been issued or a timely written notice of claim has been made by Contractor.
3. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract.
4. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done.
5. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-46- 00 72 13 – GENERAL CONDITIONS
with performance of the work, including Additional Work, promptly and expeditiously.
6. Contractor shall make available to the Stadium Manager any of the Contractor’s documents related to the Project immediately upon request of the Stadium Manager, as set forth in Article 52.
7. Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.
B. Contract Price Change.
1. Process for Determining Adjustments in Contract Price. a. Owner Initiated Change. The Contractor must submit a complete cost proposal, including any change in the Contract Price or Contract Time, within seven (7) Days after receipt of a scope of a proposed change order initiated by the Stadium Manager, unless the Stadium Manager requests that proposals be submitted in less than seven (7) Days.
b. Contractor Initiated Change. The Contractor must give written notice of a proposed change order required for compliance with the Contract Documents within seven (7) Days of discovery of the facts giving rise to the proposed change order.
c. Whenever possible, any changes to the Contract amount shall be in a lump sum mutually agreed to by the Contractor and the Stadium Manager. d. Price quotations from the Contractor shall be accompanied by sufficiently detailed supporting documentation to permit verificati on by the Stadium Manager, including but not limited to estimates and quotations from subcontractors or material suppliers, as the Stadium Manager may reasonably request. Contractor shall certify the accuracy of all Change Order Requests under penalty of perjury.
e. If the Contractor fails to submit a complete cost proposal within the seven (7) Day period (or as requested), the Stadium Manager has the right to order the Contractor in writing to commence the Work immediately on a time and materials basis and/or issue a lump sum change to the Contract Price and/or Contract Time in accordance with the Stadium Manager ’s estimate. If the change is issued based on the Stadium Manager's estimate, the Contractor will waive its right to dispute the action unless within fifteen (15) Days following completion of the added/deleted work, the Contractor presents written proof that the Stadium Manager’s estimate was in error.
2. Unit Price Change Orders.
a. When the actual quantity of a Unit Price item varies from the Bid Form, compensation for the change in quantity will be calculated by multiplying the actual quantity by the Unit Price. This calculation may result in either an additive or deductive Final Change Order pursuant to the Contract Documents.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-47- 00 72 13 – GENERAL CONDITIONS
b. No Mark up for Overhead and Profit . Because the Contract Unit Prices provided in the Bid Form include Overhead and Profit as determined by Contractor at the time of Bid submission, no mark up or deduction for Overhead and Profit will be included in Unit Price Change Orders. c. Bid items included on the Bid Form may be deducted from the Work in their entirety without any negotiated extra costs.
d. Contractor acknowledges that unit quantities are estimates and agrees that the estimated unit quantities listed on the Bid Form will be adjusted to reflect the actual unit quantities which may result in an adjustment to the Contract Unit Prices. Such an adjustment will be made by execution of a final additive or deductive Change Order following Contractor’s completion of the Work. Upon notification, Contractor’s failure to respond within seven (7) Days will result in Stadium Manager’s issuance of a unit quantity adjustment to the Contract Unit Prices and/or Contract Time in accordance with the Contract Documents. e. The Stadium Manager or Contractor may make a Claim for an adjustment in the Unit Price in accordance with the Contract Documents if:
i. the quantity of any item of Unit Price Work performed by Contractor differs by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
ii. there is no corresponding adjustment with respect to any other item of Work; and
iii. Contractor believes that Contractor is entitled to an increase in Unit Price as a result of having incurred additional expense or the Stadium Manager believes that the Stadium Manager is entitled to a decrease in Unit Price and the parties are unable to agree as to the amount of any such increase or decrease..
3. Contractor shall incorporate the provisions of this Section into all agreements with Subcontractors. Compensation for Lump Sum Change Orders shall be limited to expenditures necessitated specifically by the Additional Work, and shall be according to the following:
a. Overview. The Contractor will submit a properly itemized Lump Sum Change Order Proposal covering the Additional Work and/or the work to be deleted.
This proposal will be itemized for the various components of the Additional Work and segregated by labor, material, and equipment in a detailed format satisfactory to the Stadium Manager. The Stadium Manager will require itemized change orders on all change order proposals from the Contractor, subcontractors, and sub- subcontractors regardless of tier. Details to be submitted will include detailed line item estimates showing detailed materials quantity take- offs, material prices by item and related labor hour pricing information and extensions (by line item or by drawing as applicable).
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-48- 00 72 13 – GENERAL CONDITIONS
b. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such new classifications. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
Estimated labor hours must only include hours for those workmen and working foremen directly involved in performing the change order work. Supervision above the level of working foremen (such as general foremen, superintendent, project manager, etc.) is considered to be included in the markup percentages as outlined below. Note that no separate allowances for warranty expense will be allowed as a direct cost of a change order. Costs attributed to warranty expenses will be considered to be covered by the markup. c. Labor Burden. Labor burden allowable in change orders shall be defined as employer's net actual cost of payroll taxes (FICA, Medicare, SUTA, FUTA), net actual cost for employer's cost of union benefits (or other usual and customary fringe benefits if the employees are not union employees), and net actual cost to employer for worker's compensation insurance taking into consideration adjustments for experience modifiers, premium discounts, dividends, rebates, expense constants, assigned risk pool costs, net cost reductions due to policies with deduct ibles for self -insured losses, assigned risk rebates, etc.
Contractor shall reduce their standard payroll tax percentages to properly reflect the effective cost reduction due to the estimated impact of the annual maximum wages subject to payroll taxes. An estimated percentage for labor burden may be used for pricing change orders. However, the percentage used for labor burden to price change orders will be examined at the conclusion of the Project and an adjustment to the approved change orders will be processed if it is determined that the actual labor burden percentage should have been more or less than the estimated percentage used.
d. Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight, and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory evidence of cost are not furnished within fifteen (15) Days of delivery, then the Stadium Manager shall determine the materials cost, at its sole discretion. Estimated material change order costs shall reflect the Contractor's reasonably anticipated net actual cost for the purchase of the material needed for the change order work. Estimated material costs shall reflect cost reductions available to the Contractor due to “non- cash” discounts, trade discounts, free material credits, and/or volume rebates. “Cash” discounts (i.e., prompt payment discounts of 2% or less) available on material purchased for change order work shall be credited to the Stadium Manager if the Contractor is provided the Stadium Manager funds in time for Contractor to take advantage
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-49- 00 72 13 – GENERAL CONDITIONS
of any such “cash” discounts. The portion of any “cash” discounts greater than 2% will not be considered “non- cash” discount for purposes of this provision.
Price quotations from material suppliers must be itemized with unit prices for each specific item to be purchased. "Lot pricing" quotations will not be considered sufficient substantiating detail.
e. Tool and Equipment Use. Costs for the use of small tools, which are tools that have a replacement value of $1,000 or less, shall be considered included in the Overhead and Profit mark-ups established below. Allowable change order estimated costs may include appropriate amounts for rental of major equipment specifically needed to perform the change order work (defined as tools and equipment with an individual purchase cost of more than $750). For Contractor owned equipment, the "bare" equipment rental rates allowed to be used for pricing change order proposals shall be 75% of the monthly rate listed in the most current publication of The AED Green Book divided by 176 to arrive at a maximum hourly rate to be applied to the hours the equipment is used performing the change order work. Further, for Contractor owned equipment, the aggregate equipment rent charges for any single piece of equipment used in all change order work shall be limited to 50% of the fair market value of the piece of equipment when the first change order is priced involving usage of the piece of equipment. Fuel necessary to operate the equipment will be considered as a separate direct cost associated with the change order work. f. Maximum Markup Percentage Allowable on Self -Performed Work . With respect to pricing change orders, the maximum markup percentage to be paid to any Contractor or subcontractor (regardless of tier) on self -performed work shall be a single markup percentage not-to-exceed fifteen percent (15%) of the net direct cost of (1) direct labor and allowable labor burden costs applicable to the change in the Work; (2) the net cost of material and installed equipment incorporated into the change in the Work, and (3) net rental cost of major equipment and related fuel costs necessary to complete the change in the Work.
g. Maximum Markup Percentages Allowable on Work Performed by Lower Tier Subcontractors. With respect to pricing the portion of change order proposals involving Work performed by lower ti er contractors, the maximum markup percentage allowable to the Contractor or subcontractor supervising the lower tier subcontractor's work shall not exceed five percent (5%) of the net of all approved change order work performed by all subcontractors combined for any particular change order proposal.
h. No Markup on Bonds and Liability Insurance Costs . Change order cost adjustments due to increases or decreases in bond or insurance costs (if applicable) shall not be subject to any markup.
i. Direct and Indirect Costs Covered by Markup Percentages . As a further clarification, the agreed upon markup percentage set forth above is intended to cover the Contractor's profit and all indirect costs associated with the change order work. Items intended to be covered by the markup percentage include, but are not limited to: home office expenses, branch office and field office
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-50- 00 72 13 – GENERAL CONDITIONS
overhead expense of any kind, project management, superintendents, general foremen, estimating, engineering, coordinating, expediting, purchasing, detailing, legal, accounting, data processing or other administrative expenses, shop drawings, permits, auto insurance and umbrella insurance, pick-up truck costs, and warranty expense costs. The cost for the use of small tools is also to be considered covered by the markup percentage established above. Small tools shall be defined as tools and equipment (power or non- power) with an individual purchase cost of less than $750.
j. Deduct Change Orders and Net Deduct Changes. The application of the markup percentages referenced above will apply to both additive and deductive change orders. In the case of a deductive change order, the credit will be computed by applying the sliding scale percentages as outlined above so that a deductive change order would be computed in the same manner as an additive change order. In those instances where a change involves both additive and deductive work, the additions and deductions will be netted and the markup percentage adjustments will be applied to the net amount. k. Contingency. In no event will any lump sum or percentage amounts for "contingency" be allowed to be added as a separate line item in change order estimates. Unknowns attributable to labor hours will be accounted for when estimating labor hours anticipated performing the work. Unknowns attributable to material scrap and waste will be estimated as part of material costs. l. Insurance and Bonds. In the event the Contractor has been required to furnish insurance and/or bonds as part of the base contract price, a final contract change order will be processed to account for the Contractor's net increase or decrease in insurance costs and/or bond premium costs associated with change orders to Contractor's base Contract Price.
4. Time and Materials Change Orders.
a. General. The term Time and Materials means the sum of all costs reasonably and necessarily incurred and paid by Contractor for labor, materials, and equipment in the proper performance of Additional Work. Except as otherwise may be agreed to in writing by the Stadium Manager, such costs shall be in amounts no higher than those prevailing in the locality of the Project, and shall include only the following items.
b. Timely and Final Documentation.
i. T&M Daily Sheets. Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the Stadium Manager’s Representative for an approval signature each day Additional Work is performed. Failure to get the Stadium Manager ’s Representative’s approval signature each Day shall result in a waiver of Contractor’s right to claim these costs. The Stadium Manager ’s Representative’s signature on time sheets only serves as verification that the Work was performed and is not indicative of Stadium Manager ’s agreement to Contractor’s entitlement to the cost.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-51- 00 72 13 – GENERAL CONDITIONS
ii. T&M Daily Summary Sheets. All documentation of incurred costs (“T&M Daily Summary Sheets”) shall be submitted by Contractor within three (3) Days of incurring the cost for labor, material, equipment, and special services as Additional Work is performed. Contractor’s actual costs shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and special services. Each T&M Daily Summary Sheet shall include Contractor’s actual costs incurred for the Additional Work performed that day and a cumulative total of Contractor’s actual costs incurred for the Additional Work. Contractor’s failure to provide a T&M Daily Summary Sheet showing a total cost summary within three (3) Days but within fiv e (5) Days of performance of the Work will result in the Contractor’s otherwise allowable overhead and profit being reduced by 50% for that portion of Additional Work which was not documented in a timely manner. Contractor’s failure to submit the T&M Daily Summary Sheet within five (5) Days of performance of the Work will result in a total waiver of Contractor’s right to claim these costs.
iii. T&M Total Cost Summary Sheet. Contractor shall submit a T&M Total Cost Summary Sheet, which shall include total actual costs, within seven (7) Days following completion of Stadium Manager approved Additional Work.
Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and special services. Contractor’s failure to submit the T&M Total Cost Summary Sheet within seven (7) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the T&M Summary Sheets or the performance of the Additional Work. c. Labor. The Contractor will be paid the cost of labor for the workers used in the actual and direct performance of the Work. The cost of labor will be the sum of the actual wages paid (which shall include any employer payments to or on behalf of the workers for health and welfare, pension, vacation, and si milar purposes) substantiated by timesheets and certified payroll for wages prevailing for each craft or type of workers performing the Additional Work at the time the Additional Work is done, and the labor surcharge set forth in the Department of Transportation publication entitled Labor Surcharge and Equipment Rental Rates, which is in effect on the date upon which the Work is accomplished and which is a part of the Contract. The labor surcharge shall constitute full compensation for all payments imposed by Federal, State, or local laws and for all other payments made to, or on behalf of, the workers, other than actual wages.
i. Equipment Operator Exception. Labor costs for equipment operators and helpers shall be paid only when such costs are not included in the invoice for equipment rental.
ii. Foreman Exception. The labor costs for foremen shall be proportioned to all of their assigned work and only that applicable to the Additional Work shall be paid. Indirect labor costs, including, without limitation, the superintendent, project manager, and other labor identified in the Contract Documents will be considered Overhead.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-52- 00 72 13 – GENERAL CONDITIONS
d. Materials. The cost of materials reported shall be itemized at invoice or lowest current price at which materials are locally available and delivered to the Project site in the quantities involved, plus the cost of sales tax, freight, delivery, and storage.
i. Trade discounts available to the purchaser shall be credited to the Stadium Manager notwithstanding the fact that such discounts may not have been taken by Contractor.
ii. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the Stadium Manager’s Representative. iii. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on Additional Work items or the current wholesale price for such materials delivered to the Project site, whichever price is lower.
iv. If, in the opinion of the Stadium Manager’s Representative, the cost of materials is excessive, or Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for t he total quantity concerned delivered to the Project site less trade discounts.
v. The Stadium Manager reserves the right to furnish materials for the Additional Work and no Claim shall be allowed by Contractor for costs of such materials or Indirect Costs or profit on Stadium Manager furnished materials.
e. Equipment.
i. Rental Time. The rental time to be paid for equipment on the Project site shall be the time the equipment is in productive operation on the Additional Work being performed and, in addition, shall include the time required to move the equipment to the location of the Additional Work and return it to the original location or to another location requiring no more time than that required to return it to its original location; except that moving time will not be paid if the equipment is used on other than the Additional Work, even though located at the site of the Additional Work.
(a) Rental Time Not Allowed. Rental time will not be allowed while equipment is inoperative due to breakdowns.
(b) Computation Method. The following shall be used in computing the rental time of equipment on the Project site.
(i) When hourly rates are paid, any part of an hour less than 30 minutes of operation shall be considered to be 1/2- hour of operation, and any part of an hour in excess of 30 minutes will be considered one hour of operation.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-53- 00 72 13 – GENERAL CONDITIONS
(ii) When daily rates are paid, any part of a day less than 4 hours operation shall be considered to be 1/2- day of operation, and any part of an hour in excess of 4 hours will be considered one day of operation.
ii. Rental Rates. Contractor will be paid for the use of equipment at the lesser of (i) the actual rental rate, or (ii) the rental rate listed for that equipment in the California Department of Transportation publication entitled Labor Surcharge and Equipment Rental Rates, which is in effect on the date upon which the Contract was executed. Such rental rates will be used to compute payments for equipment whether the equipment is under Contractor’s control through direct ownership, leasing, renting, or another method of acquisition. The rental rate to be applied for use of each item of equipment shall be the rate (i.e., daily, monthly) resulting in the least total cost to the Stadium Manager for the total period of use. If it is deemed necessary by Contractor to use equipment not listed in the publication, an equitable rental rate for the equipment will be established by the Stadium Manager’s Representative. Contractor may furnish cost data which might assist the Stadium Manager’s Representative in the establishment of th e rental rate.
iii. Contractor-Owned Equipment.
(a) For Contractor-owned equipment, the allowed equipment rental rate will be limited to the monthly equipment rental rate using a utilization rate of 173 hours per month.
(b) For Contractor-owned equipment, the rental time to be paid for equipment on the Site shall be the time the equipment is in productive operation, unless, in the instance of standby time, the equipment could be actively used by Contractor on another project, then Stadium Manager shall pay for the entirety of the time the equipment is on Site.
It shall be Contractor’s burden to demonstrate to the Stadium Manager that the equipment could be actively used on another project.
iv. All equipment shall, in the opinion of the Stadium Manager ’s Representative, be in good working condition and suitable for the purpose for which the equipment is to be used.
v. Before construction equipment is used on the Additional Work, Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the Stadium Manager ’s Representative, in duplicate, a description of the equipment and its identifying number and the scheduled Additional Work activities planned. vi. Unless otherwise specified, manufacturer’s rating and manufacturer approved modifications shall be used to classify equipment for the determination of applicable rental rates. Equipment which has no direct
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-54- 00 72 13 – GENERAL CONDITIONS
power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
f. Special Services. Special work or services are defined as that Additional Work characterized by extraordinary complexity, sophistication, or innovation or a combination of the foregoing attributes which are unique to the construction industry.
i. Invoices for Special Services. When the Stadium Manager ’s Representative and Contractor determine that a special service is required which cannot be performed by the forces of Contractor or those of any of its Subcontractors, the special service may be performed by an entity especially skilled in the Additional Work. Invoices for special services based upon the current fair market value thereof may be accepted without complete itemization of labor, material, and equipment rental costs, after validation of market values by the Stadium Manager’s Representative. ii. Discount and Allowance. All invoices for special services will be adjusted by deducting all trade discounts offered or available, whether the discounts were taken or not. In lieu of Overhead and Profit specifi ed herein, a total allowance not to exceed fifteen percent (15%) for Overhead and Profit will be added to invoices for Special Services.
iii. When the Stadium Manager determines, in its sole discretion, that competitive bidding is necessary for certain special services, Contractor shall solicit competitive bids for those special services. g. Excluded Costs. The term Time and Material shall not include any of the following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by Contractor’s allowance for Overhead and Profit.
i. Overhead Cost. Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Additional Work; ii. Office Expenses. Expenses of Contractor’s principal and branch offices; iii. Capital Expenses. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
iv. Negligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property;
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-55- 00 72 13 – GENERAL CONDITIONS
v. Other. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents;
vi. Small Tools. Cost of small tools valued at less than $1,000 and that remain the property of Contractor;
vii. Administrative Costs. Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estim ates, or the preparation or filing of Claims;
viii. Anticipated Lost Profits . Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
ix. Home Office Overhead. Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny , burden fluctuation, or other similar methods;
x. Special Consultants and Attorneys . Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work. h. Overhead, Profit and Other Charges . The mark-up for overhead (including supervision) and profit on work added to the Contract shall be according to the following:
i. “Net Cost” is defined as consisting of costs of labor, materials , and tools and equipment only excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and subcontractors at cost only, without mark -up. Contractor shall provide Stadium Manager with documentation of the costs, including, but not limited to, payroll records, invoices, and such other information as Stadium Manager may reasonably request.
ii. For Work performed by the Contractor’s forces, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Net Cost of the Work.
iii. For Work performed by a subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the subcontractor’s Net Cost of the Work to which the Contractor may add five percent (5%) of the subcontractor’s Net Cost.
iv. For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the sub-subcontractor’s Net Cost for Work to which the subcontractor and general contractor may each add an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-56- 00 72 13 – GENERAL CONDITIONS
v. No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by Stadium Manager exceed twenty -five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.
5. All of the following costs are included in the markups for overhead and profit described above, and Contractor shall not receive any additional compensation for: Submittals, drawings, field drawings, Shop Drawings, including submissions of drawings; field inspection; General Superintendence; General administration and preparation of cost proposals, schedule analysis, Change Orders, and other supporting documentation; computer services; reproduction services; Salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; Janitorial services; Small tools, incidentals and consumables; Temporary On-Site facilities (Offices, Telephones, High Speed Internet Access, Plumbing, Electrical Power, Lighting; Platforms, Fencing, Water), Jobsite and Home office overhead or other expenses; vehicles and fuel used for work otherwise included in the Contract Documents; Surveying; Estimating; Protection of Work; Handling and disposal fees; Final Cleanup; Other Incidental Work; Related Warranties; insurance and bond premiums.
6. For added or deducted Work by subcontractors, the Contractor shall furnish to the Stadium Manager the subcontractor’s signed detailed record of the cost of labor, material and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub-subcontractors
7. For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to the Stadium Manager a detailed record of the cost to the Contractor, signed by such vendor or supplier.
8. Any change in the Work involving both additions and deletions shall indicate a net total cost, including subcontracts and materials. Allowance for overhead and profit, as specified herein, shall be applied if the net total cost is an increase in the Contract Price; overhead and profit allowances shall not be applied if the net total cost is a deduction to the Contract Price. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was executed.
9. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order for Work. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the Stadium Manager ’s change order form in an attempt to reserve additional rights.
10. If the Stadium Manager disagrees with the proposal submitted by Contractor, it will notify the Contractor and the Stadium Manager will provide its opinion of the appropriate price and/or time extension. If the Contractor agrees with the Stadium Manager, a Change Order will be issued by the Stadium Manager. If no agreement can be reached, the Stadium Manager shall have the right to issue a unilateral Change Order setting forth its determination of the reasonable additions or savings
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-57- 00 72 13 – GENERAL CONDITIONS
in costs and time attributable to the extra or deleted work. Such determination shall become final and binding if the Contractor fails to submit a claim in writing to the Stadium Manager within fifteen (15) Days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order, and providing such supporting documentation for its position as the Stadium Manager may require.
C. Change of Contract Times.
1. The Contract Times may only be changed by a Change Order.
2. All changes in the Contract Price and/or adjustments to the Contract Times related to each change shall be included in Contractor’s COR pursuant to this Article. No cost or time will be allowed for cumulative effects of multiple changes. All Change Orders must state that the Contract Time is not changed or is either increased or decreased by a specific number of days. Failure to include a change to time shall waive any change to the time unless the parties mutually agree in writing to postpone a determination of the change to time resulting from the Change Order.
3. Notice of the amount of the request for adjustment in the Contract Times with supporting data shall be delivered within seven (7) Days after such start of occurrence, unless Stadium Manager’s Representative allows an additional period of time to ascertain more accurate data in support of the request. No extension of time or additional compensation shall be given for a delay if the Contractor failed to give notice in the manner and within the time prescribed.
4. Stadium Manager may elect, at Stadium Manager ’s sole discretion, to grant an extension in Contract Times, without Contractor’s request, because of delays or other factors.
5. Use of Float and Critical Path.
a. Float is for the benefit of the Project. Float shall not be considered for the exclusive use or benefit of either the Stadium Manager or the Contractor. b. Contractor shall not be entitled to compensation, and Stadium Manager will not compensate Contractor, for delays which impact early completion. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float.
6. Contractor’s entitlement to an extension of the Contract Times is limited to a Stadium Manager -caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis.
No time extension shall be allowed unless, and then only to the extent that, the Stadium Manager-caused delay extends the critical path beyond the previously approved Contract Time. If approved, the increase in time required to complete the Work shall be added to the Contract Time.
a. Contractor shall not be entitled to an adjustment in the Contract Price or Contract Times for delays within the control of Contractor. Delays attributable
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-58- 00 72 13 – GENERAL CONDITIONS
to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.
b. If Contractor is delayed in the performance or progress of the Work by a Force Majeure Event, acts or failures to act of utility owners not under the control of Stadium Manager , or other causes not the fault of and beyond control of Stadium Manager and Contractor, then Contractor shall be entitled to an time extension when the Work stopped is on the critical path. Such a non- compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays. Contractor must submit a timely request in accordance with the requirements of this Article.
c. Utility-Related Delays.
i. Contractor shall immediately notify in writing the utility owner and Stadium Manager’s Representative of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal, or relocation of utilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with this Article.
ii. Contractor shall not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents or by the Underground Service Alert survey.
7. Content for Requests for Contract Extension. Contractor’s justification for entitlement shall be clear and complete citing specific Contract Document references and reasons on which Contractor’s entitlement is based. At a minimum, each request for a time extension must include:
a. Each request for an extension of Contract Time must identify the impacting event, in narrative form, providing a description of the delay event and sufficient justification as to why the Contractor is entitled to a time extension. Contractor must demonstrate that the delay arises from unforeseeable causes beyond the control and without the fault or negligence of both Contractor and any Subcontractors or Suppliers, or any other persons or organizations employed by any of them or for whose acts any of them may be liable, and that such causes in fact lead to performance or completion of the Work, or specified part in question, beyond the corresponding Contract Times, despite Contractor’s reasonable and diligent actions to guard against those effects. b. Each request for an extension of Contract Time must include a time impact analysis in CPM format, using the Contemporaneous Impacted As -Planned Schedule Analysis to calculate the impact of the delay event.
8. No Damages for Reasonable Delay.
a. Stadium Manager’s liability to Contractor for delays for which Stadium Manager is responsible shall be limited to only an extension of time unless such delays
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-59- 00 72 13 – GENERAL CONDITIONS
were unreasonable under the circumstances. In no case shall Stadium Manager be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs.
b. Damages caused by unreasonable Stadium Manager delay that impact the critical path, including delays caused by items that are the responsibility of the Stadium Manager pursuant to Government Code Section 4215, shall be compensated at the Daily Rate established in the Special Conditions. No other calculations, proportions or formulas shall be used to calculate any delay damages.
c. Stadium Manager and Stadium Manager’s Representative, and the officers, members, partners, employees, agents, consultants, or subcontractors of each of them, shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project.
9. Contractor’s failure, neglect, or refusal to comply with the requirements of the Contract Documents, or any portion thereof, shall bar Contractor’s request for extensions of the Contract Times. Such failure, neglect, or refusal prejudices Stadium Manager’s and Stadium Manager’s Representative’s ability to recognize and mitigate delay, and such failure, neglect, or refusal prevent the timely analysis of requests for extensions of Contract Times, and whether such extensions may be warranted. Contractor hereby waives all rights to extensions of Contract Times due to delays or accelerations that result from or occur during periods of time for which Contractor fails, neglects, or refuses to fully comply with the requirements of this Article.
ARTICLE 45. FINAL ACCEPTANCE AND PAYMENT
A. The acceptance of the Work on behalf of the Stadium Manager will be made by the Stadium Manager’s Representative. Such acceptance by the Stadium Manager shall not constitute a waiver of defects. When the Work has been accepted there shall be paid to Contractor a sum equal to the contract price less any amounts previously paid Contractor and less any amounts withheld by the Stadium Manager from Contractor under the terms of the C ontract. The final five percent (5%), or the percentage specified in the Notice Inviting Bids where the Stadium Manager has adopted a finding of substantially complete, shall not become due and payable until five (5) calendar days shall have elapsed after the expiration of the period within which all claims may be filed under the provisions of Civil Code Section 9356. If the Contractor has placed securities with the Stadium Manager as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the contract price less any amounts due the Stadium Manager under the terms of the Contract.
B. Unless Contractor advises the Stadium Manager in writing prior to acceptance of the final five percent (5%) or the percentage specified in the Notice Inviting Bids where the Stadium Manager has adopted a finding of substantially complete, or the return of
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-60- 00 72 13 – GENERAL CONDITIONS
securities held as described herein, said acceptance shall operate as a release to the Stadium Manager of all claims and all liability to Contractor for all things done or furnished in connection with this work and for every act of negligence of the Stadium Manager and for all other claims relating to or arising out of this work. If Contractor advises the Stadium Manager in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the Stadium Manager may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the Stadium Manager with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this contract.
C. In case of suspension of the contract any unpaid balance shall be and become the sole and absolute property of the Stadium Manager to the extent necessary to repay the Stadium Manager any excess in the cost of the Work above the contract price.
D. Final payment shall be made no later than 60 Days after the date of acceptance of the Work by the Stadium Manager or the date of occupation, beneficial use and enjoyment of the Work by the Stadium Manager including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code Section 8136. In the event of a dispute between the Stadium Manager and the Contractor, the Stadium Manager may withhold from the final payment an amount not to exceed 150% of the disputed amount.
E. Within ten (10) Days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its subcontractors from whom retention has been withheld each subcontractor’s share of the retention received.
However, if a retention payment received by Contractor is specifically designated for a particular subcontractor, payment of the retention shall be made to the designated subcontractor if the payment is consistent with the terms of the subcontract.
ARTICLE 46. OCCUPANCY; BENEFICIAL USE
The Stadium Manager reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.
ARTICLE 47. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the Stadium Manager’s choosing), indemnify and hold harmless the Indemnified Parties from and against:
A. Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-61- 00 72 13 – GENERAL CONDITIONS
directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caus ed, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the Indemnified Parties (including passive negligence), except the sole negligence, active negligence or willful misconduct of the Indemnified Parties.
B. Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements.
C. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor;
D. Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under the agreement. Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.
Contractor shall immediately defend, at Contractor’s own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the Indemnified Parties. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against the Indemnified Parties in any such suit, action or other legal proceeding. Contractor shall reimburse the Indemnified Parties for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.
ARTICLE 48. PROCEDURE FOR RESOLVING DISPUTES
Contractor shall timely comply with all notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 44, Changes and Extra Work, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the Contract Price or Contract Time, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.
A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-62- 00 72 13 – GENERAL CONDITIONS
on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with said statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with Article 44 “Changes and Extra Work” has been denied by the Stadium Manager, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the Stadium Manager. Claims governed by this Article may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the procedures contained in Article 44, Changes and Extra Work, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Article must be filed no later than thirty (30) Days after a request for change has been denied in whole or in part or after any other event giving rise to a Claim. The Claim shall be submitted in writing to the Stadium Manager and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the Claim shall include the documents necessary to substanti ate the claim. Nothing herein is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of Claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.
C. Supporting Documentation. The Contractor shall submit all Claims in the following format:
1. Summary of Claim merit and price, reference Contract Document provisions pursuant to which the claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Analysis of Claim merit
5. Analysis of Claim cost
6. Time impact analysis in CPM format
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-63- 00 72 13 – GENERAL CONDITIONS
7. If Contractor’s Claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, Contractor shall provide a summary of the percentage of the Claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.
D. Stadium Manager’s Response. Upon receipt of a Claim pursuant to this Article, Stadium Manager shall conduct a reasonable review of the Claim and, within a period not to exceed 45 Days, shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 Days after the Stadium Manager issues its written statement.
1. If the Stadium Manager needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim, and the Stadium Manager’s governing body does not meet within the 45 Days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the Stadium Manager shall have up to three Days following the next duly publicly noticed meeting of the Stadium Manager’s governing body after the 45-Day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
2. Within 30 Days of receipt of a Claim, the Stadium Manager may request in writing additional documentation supporting the Claim or relating to defenses or claims the Stadium Manager may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of Stadium Manager and the Contractor. The Stadium Manager’s written response to the Claim, as further documented, shall be submitted to the Contractor within 30 Days (if the Claim is less than $15,000, within 15 Days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.
E. Meet and Confer. If the Contractor disputes the Stadium Manager’s written response, or the Stadium Manager fails to respond within the time prescribed, the Contractor may so notify the Stadium Manager, in writing, either within 15 Days of receipt of the Stadium Manager’s response or within 15 Days of the Stadium Manager’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the Stadium Manager shall schedule a meet and confer conference within 30 Days for settlement of the dispute.
F. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the claim remains in dispute, the Stadium Manager shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 Days after the Stadium Manager issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation,
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-64- 00 72 13 – GENERAL CONDITIONS
with the Stadium Manager and the Contractor sharing the associated costs equally.
The Stadium Manager and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the Claim has been ident ified in writing, unless the parties agree to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.
3. Unless otherwise agreed to by the Stadium Manager and the Contractor in writing, the mediation conducted pursuant to this Article shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
G. Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.
H. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non- binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code Section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-65- 00 72 13 – GENERAL CONDITIONS
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.
I. Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Sections 900, et seq. prior to filing any lawsuit against the Stadium Manager. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the Stadium Manager may be filed. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.
J. Non-Waiver. The Stadium Manager’s failure to respond to a claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the claim being deemed rejected in its entirety.
ARTICLE 49. STADIUM MANAGER’S RIGHT TO TERMINATE CONTRACT A. Suspension of Work by the Stadium Manager:
1. Stadium Manager in its sole and absolute discretion for any reason or no r eason whatsoever may at any time, with or without cause, suspend performance of all or any part of the Work by giving not less than five (5) Days written notice to the Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension. Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise: (1) immediately discontinue Work on the date and to the extent specified in the notice; (2) place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-66- 00 72 13 – GENERAL CONDITIONS
required in the notice; (3) promptly make every reasonable effort to obtain suspension upon terms satisfactory to the Stadium Manager of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and (4) continue to protect and maintain the Work including those portions on which Work has been suspended.
3. Stadium Manager shall not be liable for any additional costs, damages or anticipated profits incurred by Contractor or its Subcontractors and the Contract Price shall not be increased during the period of suspension, except the actual costs incurred by Contractor, excluding overhead and profit for (a) the purpose of safeguarding the Work and material and equipment in transit or at the Site during the period of suspension, (b) Contractor’s or its Subcontractor’s rented equipment which are maintained at the Site, or (c) other reasonable and unavoidable costs of shutting down the Work, or reassembling personnel and equipment resulting directly from such suspension. Contractor shall be granted an extension of the Contract Time equal to the number of days performance of Work is suspended; provided, however, that no actual costs or extension of Contract Time shall be granted if the suspension results from Contractor's non- compliance with the requirements of the Contract.
B. Termination for Cause by the Stadium Manager:
1. In the sole estimation of the Stadium Manager, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the Stadium Manager may serve written notice upon the Contractor and its Surety of the Stadium Manager 's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the Contractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) Days unless such violations have ceased and arrangements satisfactory to the Stadium Manager have been made for correction of said violations.
2. In the event that the Stadium Manager serves such written notice of termination upon the Contractor and the Surety, the Surety shall have the right to take over and perform the Contract. If the Surety does not: (1) give the Stadium Manager written notice of Surety's intention to take over and commence performance of the Contract within 15 calendar days of the Stadium Manager's service of said notice of intent to terminate upon Surety; and (2) actually commence performance of the Contract within 30 calendar days of the Stadium Manager's service of said notice upon Surety; then the Stadium Manager may take over the Work and prosecute the same to completion by separate contract or by any other method it may deem advisable for the account and at the expense of the Contractor.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-67- 00 72 13 – GENERAL CONDITIONS
3. In the event that the Stadium Manager elects to obtain an alternative performance of the Contract as specified above: (1) the Stadium Manager may, without liability for so doing, take possession of and utilize in completion of the Work such materials, appliances, plants and other property belonging to the Contractor that are on the site and reasonably necessary for such completion (A special lien to secure the clai ms of the Stadium Manager in the event of such suspension is hereby created against any property of Contractor taken into the possession of the Stadium Manager under the terms hereof and such lien may be enforced by sale of such property under the direction of the Stadium Manager without notice to Contractor. The proceeds of the sale after deducting all expenses thereof and connected therewith shall be credited to Contractor. If the net credits shall be in excess of the claims of the Stadium Manager against Contractor, the balance will be paid to Contractor or Contractor’s legal representatives.); and (2) Surety shall be liable to the Stadium Manager for any cost or other damage to the Stadium Manager necessitated by the Stadium Manager securing an alternate performance pursuant to this Article.
C. Termination for Convenience by the Stadium Manager:
1. The Stadium Manager may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, if the Stadium Manager determines that a termination is in the Stadium Manager's interest.
2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of the Stadium Manager, the extent of termination, and the Effective Date of such termination.
3. After receipt of Notice of Termination, and except as directed by the Stadium Manager's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-68- 00 72 13 – GENERAL CONDITIONS
f. Submit to the Stadium Manager 's Representative, within ten (10) Days from the Effective Date of the Notice of Termination, all of the usual documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Effective Date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the Stadium Manager's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Stadium Manager’s Representative no later than 30 calendar days after the Effective Date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the Stadium Manager 's Termination for Convenience.”
4. Termination of the Contract shall not relieve Surety of its obligation for any just claims arising out of or relating to the Work performed.
5. In the event that the Stadium Manager exercises its right to terminate this Contract pursuant to this clause, the Stadium Manager shall pay the Contractor, upon the Contractor's submission of the documentation required by this clause and other applicable provisions of the Contract Documents, the following amounts:
a. All actual reimbursable costs incurred according to the provisions of this Contract.
b. A reasonable allowance for profit on the cost of the Work performed, provided Contractor establishes to the satisfaction of the Stadium Manager 's Representative that it is reasonably probable that Contractor would have made a profit had the Contract been completed and provided further, that the profit allowed shall in no event exceed fifteen (15%) percent of the costs. c. A reasonable allowance for Contractor's administrative costs in determining the amount payable due to termination of the Contract under this Article.
D. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the Stadium Manager may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the Stadium Manager or the Contract is terminated.
E. Stadium Manager shall not be liable for any costs other than the charges or portions thereof which are specified and permitted herein. Contractor shall not be entitled to payment for unperformed Work including, without limitation, any overhead and profit on the portion of the Work that is terminated and shall not be entitled to damages or compensation of any kind or nature for termination of Work.
ARTICLE 50. WARRANTY AND GUARANTEE OF WORK
A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-69- 00 72 13 – GENERAL CONDITIONS
will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the Stadium Manager, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year from the date of the Notice of Completion of the Project without any expense whatever to the Stadium Manager, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as Stadium Manager may require to verify that any correct ive actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the above-mentioned conditions within ten (10) Days after being notified in w riting of required repairs, to the reasonable satisfaction of the Stadium Manager, the Stadium Manager shall have the right to correct and replace any defective or non- conforming Work and any work damaged by such work or the replacement or correction there of at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the Stadium Manager for any expenses incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for Stadium Manager all warranties that would be given in normal commercial practice and assign to Stadium Manager any and all manufacturer’s or installer’s warranties for equipment or materials not manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the Stadium Manager with all warranty and guarantee documents prior to final Acceptance of the Project by the Stadium Manager as required.
D. When specifically indicated in the Contract Documents or when directed by the Stadium Manager’s Representative, the Stadium Manager may furnish materials or products to the Contractor for installation. In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the Stadium Manager for installation by the Contractor to be voided or reduced, Contractor shall indemnify Stadium Manager from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the Stadium Manager for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.
E. The Contractor shall remedy at its expense any damage to Stadium Manager-owned or controlled real or personal property.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-70- 00 72 13 – GENERAL CONDITIONS
F. The Stadium Manager shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect, or damage; the Stadium Manager shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.
G. In the event of any emergency constituting an immediate hazard to he alth, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the Stadium Manager may undertake at Contractor ’s expense, and without prior notice, all Work necessary to correct such condition.
H. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of Defective Work, the Stadium Manager prefers to accept it, Stadium Manager may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to Stadium Manager’s evaluation of and determination to accept such Defective Work and for the diminished value of the Work.
2. If any acceptance of defective work occurs prior to release of the Project Retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and Stadium Manager shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by Stadium Manager.
3. If the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to Stadium Manager.
4. If the acceptance of Defective Work occurs after release of the Project Retention, an appropriate amount will be paid by Contractor to Stadium Manager.
I. Stadium Manager May Correct Defective Work.
1. If Contractor fails within a reasonable time after written notice from Stadium Manager’s Representative to correct Defective Work, or to remove and replace rejected Work as required by Stadium Manager, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, Stadium Manager may, after seven (7) Days’ written notice to Contractor, correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, Stadium Manager may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-71- 00 72 13 – GENERAL CONDITIONS
which Stadium Manager has paid Contractor but which are stored elsewhere.
Contractor shall allow Stadium Manager and Stadium Manager’s Representative, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable Stadium Manager to exercise the rights and remedies to correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by Stadium Manager correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions into the Contract Documents with respect to the Work; and Stadium Manager shall be entitled to an appropriate decrease in the Contract Price.
4. Such claims, costs, losses and damages will include, but not be limited to, all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of Defective Work.
5. If the Change Order is executed after all payments under the Contract have been paid by Stadium Manager and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to Stadium Manager.
6. If the Change Order is executed after release of the Project Retention, an appropriate amount will be paid by Contractor to Stadium Manager.
7. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to Stadium Manager correcting Defective work.
J. Nothing in the Warranty or in the Contract Documents shall be construed to limit the rights and remedies available to Stadium Manager at law or in equit y, including, but not limited to, Code of Civil Procedure Section 337.15.
ARTICLE 51. DOCUMENT RETENTION & EXAMINATION
A. In accordance with Government Code Section 8546.7, records of both the Stadium Manager and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.
B. Contractor shall make available to the Stadium Manager any of the Contractor’s other documents related to the Project immediately upon request of the Stadium Manager.
C. In addition to the State Auditor rights above, the Stadium Manager shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the Stadium Manager, for a period of four (4) years after final payment.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-72- 00 72 13 – GENERAL CONDITIONS
ARTICLE 52. SEPARATE CONTRACTS
A. The Stadium Manager reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall proper ly connect and coordinate its Work with theirs.
B. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Stadium Manager’s Representative any problems with the Work in place or discrepancies with the Contract Documents.
C. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the Stadium Manager in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project. Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Stadium Manager’s Representative shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The Stadium Manager shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.
ARTICLE 53. NOTICE AND SERVICE THEREOF
All notices shall be in writing and either served by personal delivery or mailed to the other party as designated in the Bid Forms. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to Stadium Manager shall be addressed to the Stadium Manager as designated in the Notice Inviting Bids unless Stadium Manager designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) calendar days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.
ARTICLE 54. NOTICE OF THIRD PARTY CLAIMS
Pursuant to Public Contract Code Section 9201, the Stadium Manager shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract.
The Stadium Manager is entitled to recover reasonable costs incurred in providing such notification.
ARTICLE 55. STATE LICENSE BOARD NOTICE
Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-73- 00 72 13 – GENERAL CONDITIONS
complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.
ARTICLE 56. INTEGRATION
A. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.
B. Contract Documents Represent Entire Contract. The Contract Documents are fully integrated and represent the entire agreement of the Stadium Manager and Contractor.
ARTICLE 57. ASSIGNMENT OF CONTRACT
Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the Stadium Manager .
Any assignment or change of Contractor’s name of legal entity without the written consent of the Stadium Manager shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.
ARTICLE 58. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY
Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the Stadium Manager in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect Stadium Manager’s rights under the Contract, including but not limited to the bonds.
ARTICLE 59. ASSIGNMENT OF ANTITRUST ACTIONS
Pursuant to Public Contract Code Section 7103.5, in entering into a public works contract or subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to the Stadium Manager all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 USC, Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this contract or any subcontract. This assignment shall be made and become effective at the time the Stadium Manager tenders final payment to the Contractor, without further acknowledgment by the parties.
ARTICLE 60. PROHIBITED INTERESTS
No Stadium Manager official or representative who is authorized in such capacity and on behalf of the Stadium Manager to negotiate, supervise, make, accept, or approve, or to take part in
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-74- 00 72 13 – GENERAL CONDITIONS
negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.
ARTICLE 61. CONTROLLING LAW
Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall be governed by the law of the State of California excluding any choice of law provisions.
ARTICLE 62. JURISDICTION; VENUE
Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of Santa Clara County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.
ARTICLE 63. LAWS AND REGULATIONS
A. Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified. If Contractor observes that drawings and specifications are at variance therewith, it shall promptly notify the Stadium Manager’s Representative in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in work. If Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Stadium Manager’s Representative, it shall bear all costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA regulations.
ARTICLE 64. PATENTS
Contractor shall hold and save the Stadium Manager , officials, officers , employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this contract.
ARTICLE 65. OWNERSHIP OF CONTRACT DOCUMENTS
All Contract Documents furnished by the Stadium Manager are Stadium Manager property. They are not to be used by Contractor or any subcontractor on other work nor shall Contractor claim any right to such documents. With exception of one complete set of Contract Documents, all documents shall be returned to the Stadium Manager on request at completion of the Work.
ARTICLE 66. NOTICE OF TAXABLE POSSESSORY INTEREST
In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will b e
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-75- 00 72 13 – GENERAL CONDITIONS
responsible.
ARTICLE 67. SURVIVAL OF OBLIGATIONS
All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.
END OF GENERAL CONDITIONS
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-76- 00 73 13 – SPECIAL CONDITIONS
00 73 13 – SPECIAL CONDITIONS
1.1 Stadium Manager’s Representative.
A. For purposes of this Project unless otherwise modified by the Stadium Manager , the Stadium Manager’s Representative shall be: Stadium Manager’s Vice President, Stadium Projects and Planning or designee.
1.2 Location of the Project.
A. T he Project is located at Levi’s Stadium, 4900 Marie P. DeBartolo Way, Santa Clara, CA.
1.3 Reserved.
1.4 Status of the Project Area and Rights-of-Way.
A. Stadium Manager, at its expense, will provide all rights-of-way or related right-of-way permits, or both, covering the crossing of private property and public and private rights- of-way necessary for the permanent Work; provided, however, Contractor shall, at its expense, obtain any bonds or insurance policies or pay any fees and enter into any agreements required by a controlling authority, e.g., Santa Clara Valley Transit Authority (VTA), Santa Clara Valley Water District or City of Santa Clara, before Contractor enters upon any property or right-of-way under the jurisdiction of any such controlling authority for the purpose of performing Work.
B. Stadium Manager has acquired or is negotiating to acquire any rights-of-way, or both, necessary for the permanent Work.
C. If such permits are required, all operations of Contractor shall conform to the restrictions, regulations, and requirements set forth in said permits, copies of which will be included in the Contract Documents.
D. Contractor may be required, as a condition for receiving final payment, to obtain, and provide Stadium Manager’s Representative with copies of, executed damage releases from the owners of public and private property whose property has been damaged by the Work. The damage releases will be on a form provided by Stadium Manager.
E. Contractor shall, also, as a condition for receiving final payment, obtain, and provide Stadium Manager’s Representative with copies of, executed damage releases from the owners of certain public and private property or areas which have been crossed by the Work or otherwise affected by the Work. The damage releases will be on a form provided by Stadium Manager.
1.5 Site Data.
A. The data provided herein is for the information of Contractor and is subject to all limitations and conditions set forth in the Contract Documents.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-77- 00 73 13 – SPECIAL CONDITIONS
1.6 Pre-Purchased or Pre-Negotiated Material.
NOT USED.
1.7 Modification of Hours of Work.
NOT USED.
1.8 Project Retention.
In accordance with Public Contract Code Section 7201, Stadium Manager will withhold 5% of each progress payment as retention on the Project.
1.9 R eserved.
1.10 Liquidated Damages Due to Contractor Delay.
A. T ime is of the essence. Should Contractor fail to complete all or any part of the Work within the time specified in the Contract Documents, Stadium Manager will suffer damage, the amount of which is difficult, if not impossible, to ascertain and, pursuant to the authority of Government Code Section 53069.85, Stadium Manager shall therefore be entitled to Five Hundred Dollars ($500.00) per Day as liquidated damages for each Day or part thereof that actual completion extends beyond the time specified.
B. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent Stadium Manager, in case of Contractor's default, from terminating the Contractor.
1.11 Utility Outages – Notices to Residents.
A. Should Contractor’s operations require interruption of any utility service, Contractor shall notify Stadium Manager at least ten (10) Days prior to the scheduled outage.
Contractor will notify all impacted residents on a form provided by Stadium Manager at least seven (7) Days prior to the scheduled outage.
B. Contractor shall be responsible for providing, at its cost, any temporary utility or facilities necessitated by the utility outage.
1.12 Schedule Constraints.
A. It is anticipated that the Contractor will be unable to perform Work on the Project site at least 48 hours prior to and 24 hours after any event with a projected attendance greater than 10,000 people without prior written approval from the Stadium Manager.
Specific known dates for these events at this time include the following dates:
1. June 10, 2023
2. July 2, 2023
3. July 22, 2023
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-78- 00 73 13 – SPECIAL CONDITIONS
4. July 28-29, 2023
5. August 30, 2023
6. September 16, 2023
7. All NFL home games
In addition to the foregoing known event dates, the Stadium Manager reserves the right to add up to three (3) additional event dates the addition of which shall not constitute cause for additional time or compensation to be added to the Contract.
B. Stadium Manager has considered these Schedule Constraints when determining the Contract Times and no additional time or compensation will be added to the Contract due to these Constraints.
1.13 Noise Restrictions
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by Cal/OSHA.
B. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements.
C. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.
1.14 Safety Programs.
A. In addition to all other safety requirements of the Contract Documents, Contractor must comply with Cal/OSHA safety requirements at all times during the completion of the Work.
B. Stadium Manager has considered these Safety Programs when determining the Contract Times and no additional time or compensation will be added to the Contract due to these Programs.
1.15 Coordination with Other Contractors.
A. In addition to the Contract requirements relating to other work at the Site, Stadium Manager anticipates that other contractors will be performing work within the Site.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-79- 00 73 13 – SPECIAL CONDITIONS
B. Stadium Manager has considered these other contractors when determining the Contract Times and no additional time or compensation will be added to the Contract due to these other contractors.
1.16 Levi’s Stadium – Jobsite Rules.
A. The Contractor (to include all contractors, vendors, subcontractor and employees of each) shall adhere to the following rules while on site:
1. Contractor shall park in only approved Contractor designated parking areas as identified by Stadium Manager.
2. No smoking, drugs, or alcohol permitted on site.
3. Contractor work area must be left in a clean, neat and orderly condition at the end of each day. If the Contractor fails to perform daily cleaning the Stadium Manager reserves the right to clean up debris at Contractor expense.
4. Contractor shall coordinate with Stadium Manager for use of restroom facilities prior to Project.
5. Contractor to schedule work hours with Stadium Manager prior to Project. Work outside of regularly schedule hours shall require prior written approval by Stadium Manager.
6. Contractor shall coordinate employee break areas with the Stadium Manager prior to Project. All lunch and break debris generated by the Contractor must be disposed of immediately in appropriate containers (i.e. glass, aluminum, cardboard, etc.).
7. No radios, iPods, music devices with earbuds, etc. allowed. NO EXCEPTIONS.
8. Contractor shall report Project status to the Stadium Manager weekly and provide an update on the progress of the work. Contractor shall contact Stadium Manager immediately should any incidents occur or if any conflicts with these jobsite rules should arise.
9. Personal Protective Equipment (“PPE”), including but not limited to, proper safety clothing MUST be worn at all times while on jobsite. Any personnel without proper safety clothing will not be allowed on site. This include office personnel and visitors.
Appropriate PPE shall be coordinated with the Stadium Manager prior to Project.
10. The Contract supervisor assigned to this job must have the ability to make employees follow ALL jobsite rules.
11. NO children (under 18 years old) are allowed on site.
12. Contractor, to include all employees and visitors, must register each day for stadium access through the Stadium Manager provided visitor management and access control system. Contractor employees are subject to health screening prior
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-80- 00 73 13 – SPECIAL CONDITIONS
to approval of site access. Contractor employees shall adhere to all Stadium Manager site access requirements.
13. Contractors and all employees must stay in their area as required and defined in the Project scope of work. Any Contractor employee found outside of the authorized Project area will be removed from the property and may not return to the site.
14. Contractor Equipment / Vehicles – Contractor shall coordinate delivery and use of all equipment brought and used on site (owned or rented) with the Stadium Manager prior to Project. Equipment shall display markings identifying the following information for each piece of equipment while on site:
o Contractor’s Company Name
o Contractor’s Equipment Contact
o Contact Phone Number
o Duration On-Site (i.e. 06/02/21- 06/15/21)
Equipment requiring this information includes, but is not limited to, the following types of equipment:
o Material Handling Equipment (such as Forklifts and Pallet Jacks) o Golf Carts
o Flatbeds
o Manlifts
o Vehicles
o Job Boxes
o Trailers
o Other Equipment
Anyone operating this equipment must have the proper certifications, operate them in compliance with Cal/OSHA standards, and shall follow any Stadium Manager safety protocols.
B. Social Media Policy. This policy governs contractors use of social media, including any online tools used to share content and profiles, such as personal web pages, message boards, networks, communities, and social networking websites including, but not limited to, Facebook, Twitter, Instagram, LinkedIn, Snapchat, Tumblr, Reddit, and web blogs. The lack of explicit reference to a specific site or type of social media does not limit the application of this policy. The Contractor (and all employees) are prohibited from the following:
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-81- 00 73 13 – SPECIAL CONDITIONS
1. Using social media to post or to display comments about Stadium Manager, the San Francisco 49ers, Levi’s Stadium, co- workers, supervisors, clients, vendors, suppliers or members of management that are vulgar, obscene, physically threatening or intimidating, harassing, or otherwise constitute a violation of the Stadium Manager’s wor kplace policies against discrimination, retaliation, harassment, or hostility on account of any protected category, class, status, act or characteristic.
2. Infringing on Stadium’s logos, brand names, taglines, slogans or other trademarks.
Contractors and their agents, owners, and employees shall comply with the laws regarding copyrights, trademarks, rights or publicity and other third party rights.
3. Posting or displaying content that is an intentional public attack on the quality of the Stadium’s products and/ or services in a manner that a reasonable person would perceive as calculated to harm the Stadium’s business and is unrelated to any employee concern involving wages, hours, or other terms and conditions of employment.
4. Posting a photograph of a supervisor, manager, co-worker (including players and coaches in non-public settings), vendor, supplier, or client without that individual's express permission.
Violations of this policy may result in disciplinary action up to and including removal from the jobsite. Please contact the Stadium Manager if you have any questions about this policy.
1.17 P rocurement and Contract Process Integrity and Conflict of Interest Guidelines A. PURPOSE
1. The purpose of these Guidelines is to ensure integrity in the Stadium Manager’s procurement and contract processes, to educate Stadium Manager employees, consultants, uncompensated outside parties and any person involved in the decision to award a contract about potential Conflicts of Interest, and to establish guidelines for procedural screening of Conflicts of Interest.
2. The Stadium Manager desires to provide a fair opportunity to participants in competitive processes for the award of Stadium Manager contracts by promulgating integrity and removal of Conflicts of Interest in all competitive solicitations.
B. DEFINITIONS
1. PURCHASING MANAGER
“Purchasing Manager” is the Stadium Manager representative designated by the Stadium Manager to be responsible for the Stadium Manager’s procurement process.
2. ELECTED OFFICIAL
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-82- 00 73 13 – SPECIAL CONDITIONS
"Elected Official" means the City of Santa Clara Mayor, Council Members, City Clerk, and Chief of Police.
3. COUNCIL APPOINTEES
"Council Appointees" means the City of Santa Clara City Manager, City Attorney, and City Auditor.
4. SOLICITATION
"Solicitation" means, but is not limited to, specification development, preparation and issuance of requests for proposals, quotes, qualifications or bids, evaluation of responses and submissions, and other evaluations which lead to an award of a Stadium Manager contract.
C. GENERAL PROVISIONS
1. COMMUNICATION PROTOCOL
a. Prior to Issuance of Solicitations: Prior to the issuance of Solicitations, contact between prospective respondents and Stadium Manager staff, consultants or City of Santa Clara elected officials is permissible.
b. After Issuance of Solicitations and prior to Submission deadline for Solicitations: After issuance of Solicitations, all contact between prospective respondents and the Stadium Manager with regard to the Solicitation must be directed to the procurement contact designated in the Solicitation. Stadium Manager staff and consultants will refer all inquiries with regard to the Solicitation to the procurement contact. All requests for clarification, objections to the structure, content, or distribution of a Solicitation, or other inquiries must be made in writing and the Stadium Manager shall answer to these clarifications, objections, and inquiries in writing via addenda to the Solicitation. c. After Submission Deadline of Solicitations and prior to Issuance of a Notice of Intended Award: After the submission deadline of Solicitations, all contact regarding the procurement between respondents and the Stadium Manager and participants in the evaluation process, who are not Stadium Manager employees or representatives, must be directed to the procurement contact designated in the Solicitation. Stadium Manager staff and consultants will refer all inquiries to the procurement contact identified in the Solicitation document.
d. After Issuance of a Notice of Intended Award: The Stadium Manager will issue a notice of intended award to all respondents including the basis for selection and instructions for filing a protest. All respondents shall follow the procedures for protest as indicated in the Solicitation document. During the protest period, Stadium Manager staff and consultants will refer all inquiries to the procurement contact identified in the Solicitation document. e. After Completion of Protest Period: After completion of the protest period contact between prospective respondents and Stadium Manager staff, consultants and City of Santa Clara elected officials is permissible.
D. RESPONDENT'S CODE OF CONDUCT
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-83- 00 73 13 – SPECIAL CONDITIONS
1. By submitting a response to a Stadium Manager Solicitation, respondents are individually and solely responsible for ensuring compliance with these Guidelines on behalf of the respondent's employees, agents, consultants, lobbyists, or other parties or individuals engaged for purposes of developing or supporting a response. In addition to adhering to these Guidelines, respondents may not collude, directly or indirectly among themselves in regard to the amount, terms or conditions of a Solicitation, influence any Stadium Manager staff member or evaluation team member throughout the solicitation process, including the development of specifications, submit incorrect information in the response to a Solicitation or misrepresent, or fail to disclose material facts during the evaluation process. Any evidence indicating a respondent has failed to adhere with any section of these Guidelines may result in the respondent's disqualification from the procurement as well as possible debarment.
E. CONFIDENTIALITY DURING EVALUATION PROCESS
1. Stadium Manager staff, consultants, and outside evaluators who are participants in the evaluation process are required to sign a confidentiality agreement which binds the participants not to share any information about responses received and the evaluation process until the Stadium Manager issues a notice of intended award.
F. CONFLICT OF INTEREST
1. Elected officials, appointed officials, their staffs, and Stadium Manager employees and consultants are expected to avoid any conflicts of interest. Further, such individuals should avoid the appearance of conflicts of interest in order to ensure that Stadium Manager decisions are made in an independent and impartial manner. In general, the designated Stadium Manager procurement contact, in consultation with the Stadium Manager’s Chief Financial Officer (“CFO”) shall take measures to ensure that the Stadium Manager avoid any conflict of interests in procurement processes of Stadium Manager contracts. Specifically, these measures include that:
a. Persons who may not be regularly involved in Stadium Manager procurements review this Exhibit and other ethical standards and elicit such information from them to enable the Stadium Manager to determine if the person's participation would create a conflict of interest. Such persons shall include, but are not limited to:
(i) authors of specifications
(ii) paid and unpaid evaluators
(iii) paid and unpaid consultants who assist in the procurement process b. The CFO shall discuss any potential conflict of interest identified with Stadium Manager’s legal department and document the resulting determination, and take appropriate action including, but not limited to, removal of an employee, c onsultant, or outside uncompensated party from the procurement activity or cancellation of a Solicitation.
G. ALLEGATIONS OF CONFLICT OF INTEREST
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-84- 00 73 13 – SPECIAL CONDITIONS
1. Prior to the Solicitation release, up to award of contract, any allegations of conflict of interest by a Stadium Manager employee, consultant, or other participant in the pre- Solicitation and Solicitation process shall be reported to the CFO. The CFO shall investigate the alleged conflict of interest in consultation with the Stadium Manager’s legal department and document the resulting determination.
H. ALLEGATIONS OF MISCONDUCT
1. At any time during a Solicitation process, any misconduct by a Stadium Manager employee, consultant, or other participant in the pre- Solicitation and Solicitation process, shall be reported to the CFO. The CFO shall investigate the alleged misconduct, in consultation with the procurement contact, and others, as appropriate. Nothing in these guidelines is intended to prohibit anyone from communicating with the CFO or legal department about any alleged misconduct.
END OF SPECIAL CONDITIONS
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-85- 01 00 00 – GENERAL REQUIREMENTS
01 00 00 – GENERAL REQUIREMENTS
PART 1 -- GENERAL
1.1 DESCRIPTION
This Project retrofits existing office and auxiliary locker room space s in two locations on the field level of Levi’s Stadium as indicated in the Project Plans and Specifications.
PART 2 -- PRODUCTS (NOT USED)
PART 3 -- EXECUTION
3.1 LAYOUT OF WORK AND QUANTITY SURVEYS
General. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Work performed.
Stadium Manager and/or the Stadium Manager’s Representative has established primary control to be used by the Contractor for establishing lines and grades required for the Work.
Primary control consists of benchmarks and horizontal control points in the vicinity of the Work. A listing a nd identification of the primary co ntrol is provided on the Drawings. Before beginning any layout work or constructio n activity, the Contractor shall check and verify primary contr ol, and shall advise the Stadium Manager Representative of any discrepancies.
Quantity surveys. The Contractor shall perform such surveys and computations as are necessary to determine quantities of Work performed or placed during each progress payment period, and shall perform all surveys ne cessary for the Stadium Manager Representative to determine final quantities of Work in place. The Stadium Manager Representative will determine final quantities based upon the survey data provided by the Contractor, and the design lines and grades. If r equested by the Stadium Manager Representative, the Contractor shall provide an electronic copy of data used for quantity computations.
All surveys performed for measurement of final quantities of Work and material shall be subject to approval of Stadium Manager’s Representative. Unless waived by Stadium Manager’s Representative in each specific case, quantity surveys made by the Contractor shall be made in the presence of Stadium Manager’s Representative.
Surveying
1. Accuracy. Degree of accuracy shall be an order high enough to satisfy tolerances specified for the Work and the following:
A.
A.
B.
C.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-86- 01 00 00 – GENERAL REQUIREMENTS
(a) Right-of-way and alignment of tangents and curves shall be within 0.1 foot. (b) Structure points shall be set within 0.01 foot, except where operational function of the special features or installation of metalwork and eq uipment require closer tolerances. When formwork has been placed and is ready for concrete, the Contractor shall check the formwork for conformance with the drawings and to ensure that the forms are sufficiently within the tolerance limits for the completed work.
(c) Cross-Section points shall be located within 0.1 foot, horizontally and vertically. (d) Aerial Mapping shall m eet National Mapping Standards for 2- foot contour intervals.
Records. Survey data shall be recorded in accordance with recognized professional surveying standards. Original f ield notes, com putations, and other su rveying data shall be recorded on electronic data collectors or in standard field books and must be of sufficient quality to enable the Contractor to prepare accurate record drawings as required by the Contract Documents.
Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required for surveys for the layout of work and quantity surveys shall be included in the Schedule of Pay Items for items of work requiring the surveys.
No additional compensation shall be made to the Contractor for this Work.
3.2 SCHEDULE
Estimated Schedule. Within 14 Days after the issuance of the Notice to Proceed, Contractor shall prepare a Project schedule and shall submit this to the Stadium Manager’s Representative for Approval. The receipt or Approval of any schedules by the Stadium Manager’s Representative or the Stadium Manager shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project. Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract time period. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the Stadium Manager’s Representative.
Schedule Contents. The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Project within the time specified for completion.
The overall Project Schedule duration shall be within the Contract time.
Schedule Updates. Contractor shall continuously update its construction schedule.
Contractor shall submit an updated and accurate construction schedule to the Stadium Manager’s Representative monthly when requested to do so by Stadium Manager’s D.
E.
A.
B.
C.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-87- 01 00 00 – GENERAL REQUIREMENTS
Representative. Contractor shall also submit schedules showing a three week detailed look-ahead at bi-weekly meetings conducted with the Stadium Manager. The Stadium Manager’s Representative may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule.
3.3 TEMPORARY FIELD OFFICE
NOT USED.
3.4 PROTECTION OF WORK AND PROPERTY
All traffic detector loops, fences, walls, culverts, property line monuments, or other obstructions (except property line monuments within five (5) feet of the centerline of the mains) which are removed, damaged, or destroyed in the course of the Work, shall be replaced or repaired to the original condition. If Contractor provides the Stadium Manager with reasonable notice of the need for such repair or replacement, it shall be performed by the Stadium Manager . If the Contractor fails to provide the Stadium Manager with reasonable notice, the repair or replacement shall be performed by and at the expense of the Contractor to the satisfaction of the Stadium Manager, whether or not those obstructions have been shown on the Plans, unless otherwise stated herein. It is then the Contractor’s responsibility to employ at its expense a Licensed Land Surveyor to restore all property line monuments located more than five (5) feet from the centerline of the mains, which are destroyed or obliterated. Property line monuments located within five (5) feet of the centerline of the mains will be replaced by the Stadium Manager at no expense to the Contractor, provided the Stadium Manager is notified at least 48 hours before the property line monuments are damaged.
Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.
Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be preserved.
3. Deliver materials to the Project site over a route designated by the Stadium Manager’s Representative.
4. Provide any and all dust control required and follow the Applicable air quality regulations as appropriate. If the Contractor does not comply, the Stadium Manager shall have the immediate authority to provide dust control and deduct the cost from payments to the Contractor.
A.
B.
C.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-88- 01 00 00 – GENERAL REQUIREMENTS
5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the Stadium Manager’s Representative. Contractor shall not unreasonably encumber the Project site with its materials.
6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the Stadium Manager, at no cost to the Stadium Manager.
7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the Stadium Manager.
8. Preserve and protect from injury all buildings, pole lines and all direction, warning and mileage signs that have been placed within the right-of-way.
9. At the completion of work each day, leave the Project site in a clean, safe condition.
10. Comply with any stage construction and traffic control plans. Access to residences and businesses shall be maintained at all times, unless otherwise permitted in writing by the Stadium Manager.
These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefore.
Should damage to persons or property occur as a result of the Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The Stadium Manager shall be entitled to inspect and copy any such documentation, video, or photographs.
3.5 SITE CONDITIONS SURVEYS
Work Included.
Contractor shall conduct thorough pre -construction and post -construction site condition surveys of the entire project area. Site Conditions surveys shall include written documentation of the conditions found, as well as photographs and video recordings of the area within at least 80 feet of any construction area and staging area.
The written notes, photographs, and video shall be suitable for forensic purposes to resolve any damage claims that may arise as a result of construction.
Submittals.
1. Written documentation of site condition survey at pre -construction and post- construction.
D.
E.
A.
B.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-89- 01 00 00 – GENERAL REQUIREMENTS
2. Photographs as described herein of pre- construction and post -construction conditions.
3. Video recordings as described herein of pre- construction and post -construction conditions.
4. Submittals shall be made within three days of the surveys. All post- construction data shall be submitted prior to the final project inspection.
Site Condition Written Documentation.
Written documentation shall include the time, date, and conditions under which the site survey was made. The documentation shall note the condition of structures, pavement, sidewalks, utilities, fences, and etc. within the work areas.
Photographs.
1. General – Contractor shall take enough photographs during each site survey to provide a record of conditions existing prior to construction and conditions after construction. Pre -construction photographs shall be taken prior to any construction or mobilization of equipment, but not more than one week prior to actual start of work. The pre-construction photographs may be staged at different times to match the progression of the Work.
2. The photographs shall document existing damage to public and private facilities, both prior to and after construction. Conditions to be documented include, but are not limited to: sidewalk cracks, broken curbs, separated property walls, improvements within public right -of-ways, access roads used, utility covers and markings, signs, pavement striping, pavement, unique or unusual conditions, adjacent driveways, landscaping, survey markers, and any feature directed by the Stadium Manager’s Representative. Private property that is adjacent to the public right-of-way shall be documented to the extent visible from the public right-of-way.
3. Photographs shall include items to indicate scale, as needed. In particular, scales or other items shall be laid next to close ups of structural cracks and other damaged areas being recorded. Scaling shall also be used to document elevation differences, as needed.
4. One set of color prints shall be submitted. Additional sets shall be available for reviewing in settling any construction disputes. A set of photos shall also be furnished in electronic format. The resolution shall be at least equal to 7 mega- pixels. All photos shall be documented as to time and date taken, photographer, project number, location, and orientation. Documentation shall include a brief description of objects photographed.
Video Recording.
1. Video recordings shall document the conditions of the entire area affected by construction, as well as near by structures and facilities. The general documentation requirements for videos are the same as for photographs. Video recorders shall accurately and continuously record the time and date.
C.
D.
E.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-90- 01 00 00 – GENERAL REQUIREMENTS
2. Video recordings shall include an audio portion made simultaneously during the videoing. The audio recording shall describe the location, time, orientation, and objects being recorded. Special commentary shall be provided for unusual conditions or damage noted.
3. Video equipment shall be capable of producing high resolution images and shall have zoom capabilities.
4. Video recordings shall provide an overall picture of the sites and shall provide detailed images of damaged areas. Video shall extend to the maximum height of structures.
5. The Stadium Manager’s Representative shall have the right to reject any audio video recordings submitted with unintelligible audio, uncontrolled pan or zoom, or of poor quality. Video recordings shall be repeated when rejected.
6. Video recordings shall be submitted with labels indicating the project, date, recorder, and other pertinent information. Recordings shall be submitted on standard DVDs in a standard format.
Timing.
Contractor shall provide written notice of the time scheduled for the site conditions survey and the place it is to begin. Contractor shall obtain the Stadium Manager’s Representative concurrence prior to beginning the condition survey. The Stadium Manager’s Representative reserves the right to cancel the survey due to weather conditions or other problems. Videoing shall be done during times of good visibility and no videoing or photography shall be done during periods of visible precipitation or when standing water obscures pavement. Contractor shall provide the Stadium Manager’s Representative with an opportunity to have a representative present when taking the photos and provide guidance during photographing.
Site Surveyor.
The site condition surveyor(s) shall be experienced in construction and potential damage concerns. The site condition surveyor(s) shall be familiar wit h the photography and video equipment being used.
Field Quality Control.
Prior to submitting videos and photographs, the Contractor shall spot check the photos and videos in the field to insure they accurately reflect the actual conditions and to insure they are correctly labeled.
Soils Compaction Testing.
1. All soils compaction testing will be done by a licensed geotechnical engineer furnished by the Stadium Manager. Soils compaction testing will be done for all footings and foundations prior to placement of rebar or concrete.
F.
G.
H.
I.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-91- 01 00 00 – GENERAL REQUIREMENTS
2. For pipeline construction, soil compaction testing will be done at 100-foot intervals at the bottom of the trench prior to placement of pipe bedding; at the top of the pipe bedding above the pipe; every two vertical feet of trench backfill; at the top of the trench backfill, which should be the bottom of the pavement Section; and at the top of the aggregate base prior to pavement construction.
3.6 SUBMITTAL REQUIREMENTS FOR MANUALS AND RECORD DRAWINGS General. The Contractor shall furnish all materials and perform all Work required for furnishing submittals to Stadium Manager in accordance with Contract Documents.
Technical Manuals.
1. The Contractor shall submit technical operation and maintenance information for each item of mechanical, electrical and instrumentation equipment in an organized manner in the Technical Manual. It shall be written so that it can be us ed and understood by Stadium Manager’s operation and maintenance staff.
2. The Technical Manual shall be subdivided first by specification Section number; second, by equipment item; and last, by "Category." "Categories" shall conform to the following (as applicable):
(a) Category 1 - Equipment Summary:
(1) Summary: A summary table sha ll in dicate the e quipment name, equipment number, and process area in which the equipment is installed. (b) Category 2 - Operational Procedures:
(1) Procedures: Manufacturer -recommended procedures on the f ollowing shall be included in Part 2:
a. Installation
b. Adjustment
c. Startup
d. Location of controls, special tools, equipment required, or related instrumentation needed for operation
e. Operation procedures
f. Load changes
g. Calibration
h. Shutdown
i. Troubleshooting
j. Disassemb ly
A.
B.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-92- 01 00 00 – GENERAL REQUIREMENTS
k. Reassem bly
l. Realignment
m. Testing to determine performance efficiency
n. Tabulation of proper settings for all pressure relief valves, low and high pressure switches, and other protection devices
o. List of all electrical re lay settings including alarm and contact settings
(c) Category 3 - Preventive Maintenance Procedures:
(1) Procedures: Prevent ive maintenance proc edures shall include all manufacturer-recommended procedures to be performed on a periodic basis, both by removing and replacing the equipment or component, and by leaving the equipment in place.
(2) Schedules: Recommended frequency of preventive maintenance procedures shall be included. Lubrication schedules, including lubricant SAE grade, type, and temperature ranges, shall be covered. (d) Category 4 - Parts List:
(1) Parts List: A complete parts list shall be furnished, including a generic description and manufacturer's identific ation number for each part.
Addresses and telephone numbers of the ne arest supplier and parts warehouse shall be included.
(2) Drawings: Cross-sectional or exploded view drawings shall accompany the parts list.
(e) Category 5 - Wiring Diagrams:
(1) Diagrams: Part 5 shall include complete internal and connection wiring diagrams for electrical equipment items.
(f) Category 6 - Shop Drawings:
(1) Drawings: This part shall include approved shop or fabrication drawings, complete with dimensions.
(g) Category 7 - Safety:
(1) Procedures: This part describes the safety precautions to be taken when operating and maintaining the equipment or working near it. (h) Category 8 - Documentation:
(1) All equipment warranties, affidavits, and certifications required by the Technical Specifications shall be placed in this part.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-93- 01 00 00 – GENERAL REQUIREMENTS
3. The Contractor shall furnish to Stadium Manager six (6) identical Technical Manuals. Each set shall consist of one or more volumes, each of which shall be bound in a standard binder.
Spare Parts List - The Contractor shall furnish to Stadium Manager six (6) identical sets of spare parts information for all mechanical, electrical, a nd instrumentation equipment. The spare parts list shall include the current list price of each spare part.
The spare parts list shall in clude those spare parts which each manufacturer recommends be maintained by Stadium Manager in inventory. Each manufacturer or supplier shall indicate the name, address, and telephone number of its nearest outlet of spare parts to assist Stadium Manager in ordering. The Contractor shall cross- reference all spare parts lists to the equipment numbers designated in the Contract Documents. The spare parts lists shall be bound in standard size, 3-ring binder.
Record Drawings
1. The Contractor shall maintain one record set of Drawings at the Site. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including bu ried or concealed construction a nd utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract Drawings. Said record drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. These master record drawings of the as-built conditions, including all revisions made necessary by Addenda and Change Orders shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes. Notes shall identify relevant Change Orders by number and date.
2. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every 100 linear feet, and at each bend, recording both the horizontal and vertical locations.
3. Record drawings shall be a ccessible to Stadium Manager’s Representative at all times during the construction period. Failure on the Contractor’s part to keep record drawings current could result in withholding partial payment.
4. Upon Completion of t he Project and as a condition of final acce ptance, the Contractor shall finalize and deliver a complete set of Record Drawings to Stadium Manager’s Representative. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to Stadium Manager , for the accuracy of such information, and for any errors or omissions which may or may not appear on the Record Drawings.
Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Manuals and Record Drawings shall be included in Contractor’s bid and distributed in the Schedule of Pay. No additional compensation shall be made to the Contractor for this Work.
C.
D.
E.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-94- 01 00 00 – GENERAL REQUIREMENTS
3.7 MATERIALS
Materials to be Furnished by the Contractor
1. Inspection of Materials. Materials furnished by the Contractor which will become a part of the Project shall be subject to inspection at any one or more of the following locations, as determined by Stadium Manager’s Representative: at the place of production or manufacture, at the shipping point, or at the site of the Work. To allow sufficient ti me to provide for inspection, the Contractor shall submit to Stadium Manager’s Representative, at the time of issuance, co pies of purchase orders or other written instrument confirming procurement of the ma terials, including drawings and other pertinent information, covering materials on which inspection will be made.
2. No later than fourteen ( 14) Days prior to manufacture of ma terial, Contractor shall inform Stadium Manager’s Representative, in writing, the date the material is to be manufactured.
3. Contractors Obligations. The in spection of materials at any of the locations specified above or the waiving of the inspection thereof shall not impact whether the materials and equipment conform to the Contract Documents. Contractor will not be relieved from furnishing materials meeting the requirements of the Contract Documents due to Stadium Manager ’s inspection or lack of inspection of the equipment or materials. Acceptance of any materials will be made only a fter materials are installed in the Project.
4. Cost. Unless othe rwise called for by the Cont ract Documents, the cost of all material, equipment, and labor required to accommodate Stadium Manager ’s testing efforts, in cluding an y travel required by Contractor’s forces, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items related to the materials requiring testing. No additional compensation shall be made to the Contractor for this Work.
3.8 LOCAL CONDITIONS AND REQUIREMENTS
Access to Work and Haul Routes
1. General. All work on the rights-of-way necessary for access to the Site shall be performed by the Contractor.
2. Access, Da mage, Restoration. The Contractor shall make his own investigation of the condition of available public or p rivate roads and o f clearances, restrictions, bridge-load limits, permit or bond requirements, and other limitations that affect or may affect transportation and ingress or egress at the Site. Claims for changes in Contract Price or Co ntract Times arising out of the unavailability of transportation facilities or limitations thereon shall not be considered by Stadium Manager.
3. The Contractor shall maintain and repair any damage arising out of Contractor’s operations to all roads used during construction of the Project, and upon completion of all Work, but prior to final acceptance, the roads shall be restored A.
A.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-95- 01 00 00 – GENERAL REQUIREMENTS
to their original condition. Prior t o using any road for access to the Site, the Contractor shall conduct a photograph and/or video survey of the roadway with a copy submitted to Stadium Manager’s Representative.
4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Power. Contractor shall provide at its own expense all necessary power required for operations under the contract. The Contractor shall provide and maintain in good order such modern equipment and installations as shall be adequate in the opinion of the Stadium Manager’s Representative to perform in a safe and satisfactory manner the Work required by the contract.
Construction Water.
1. Construction water shall not be used for purposes other than those required to satisfactorily complete the contract.
2. All connections to the Stadium Manager's water system used for the purposes of obtaining construction water shall utilize a temporary construction meter and backflow prevention device supplied by the Stadium Manager. The Stadium Manager-furnished backflow prevention device shall be tested immediately after installation and the construction meter and backflow prevention device shall not be placed into service until the backflow prevention device passes such tests.
Backflow prevention device testing shall be performed in accordance with applicable standards, and test results shall be provided to the Stadium Manager’s Representative. If the temporary construction meter and backflow prevention device are moved to alternate location(s) during construction, the backflow prevention device shall again be tested as described above immediately after re- installation.
3. For each temporary construction meter requested by the Contractor for the performance of work under this contract, an amount equivalent to the deposit requirement for te mporary construction meters listed in the current approved version of the Stadium Manager ’s Policies and Procedures Manual shall be withheld from the final contract payment until the temporary construction meters are returned.
Operation of Existing Water Facilities
1. The Contractor shall not operate any of the existing water systems, including pumps, motors, and hydrants, but shall contact the Stadium Manager four (4 ) calendar days in advance with a list and location of the water system facilities that will require operating, opening, stopping, or closure by the Stadium Manager.
2. At the option of the Stadium Manager’s Representative, the Contractor may be permitted to operate valves for the purpose of making connections to existing B.
C.
D.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-96- 01 00 00 – GENERAL REQUIREMENTS
mains. The Stadium Manager will perform all notification to existing customers regarding temporary loss of service.
3. Contractor shall submit a request on Stadium Manager’s standard form for any shut-down of existing water facilities.
Construction at Existing Utilities
1. General. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.
2. Permission, Notice and Liability. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the Stadium Manager Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify Stadium Manager as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to property resulting from the negligent, accidental, or intentional breaching of utilities.
3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Traffic Control
1. General. Contractor sha ll abide by traffic con trol plans ap proved by the appropriate jurisdiction.
2. Protections. Roads subject to interference by the Work shall be kept open or suitable temporary passages through the Work shall be provided and maintained by the Contractor. The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient flasher lights, flag persons, danger signals, and signs, and shall take all necessary precautions for the protection of the Work and the safety of the public. No construction work along public or private roads may proceed until the Contractor has proper barricades, flasher lights, flag persons, signals, and signs in place at the construction site.
3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in E.
F.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-97- 01 00 00 – GENERAL REQUIREMENTS
Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Cleaning Up
1. Contractor at all times shall keep premises free from debris such as waste, rubbish, and excess materials and equipment. Contractor shall not store debris under, in, or about the premises. Contractor shall also clean all asphalt and concrete areas to the degree necessary to remove oil, grease, fuel, or other stains caused by Contractor operations or equipment. The use of water, resulting in mud on streets, will not be permitted as substitute for sweeping or other methods. Dust control may require having a water truck onsite for the duration of the project, and/or use of temporary hoses and pipelines to convey water.
2. Contractor shall fully clean up the site at the completion of the Work. If the Contractor fails to immediately clean up at the completion of the Work, the Stadium Manager may do so and the cost of such clean up shall be charged back to the Contractor.
3.9 ENVIRONMENTAL QUALITY PROTECTION
Environmental Conditions
1. Contractor must comply with all applicable environmental laws, Project conditions, and constraints.
2. Stadium Manager has considered these Environmental Conditions when determining the Contract Times and no additional time or compensation will be added to the Contract due to these Conditions.
Landscape and Vegetation Preservation
1. General. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall co nduct operations so as to prevent u nnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.
2. Damage and Restoration. Movement of crews and equipment within the rights-of- way and over routes provided for access to the Work shall be pe rformed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original contours.
3. Upon completion of the Work, and following re moval of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.
4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in G.
A.
B.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-98- 01 00 00 – GENERAL REQUIREMENTS
Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Protected Species
1. General. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the Stadium Manager Repr esentative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to Stadium Manager within 2 Days.
2. Procedures. The Contractor shall immediately cease all construction activities in the immediate area of the di scovery to the extent necessary to protect the endangered plant or animal.
If directed by the Stadium Manager Representative, Contractor will refrain from working in th e immediate a rea, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable pe rmits, laws and regulations. Any Stadium Manager directed changes to the Work as a result of a siting will be pursuant to the Contract Documents.
3. False Siting. Any costs or delays incurred by Stadium Manager or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.
4. Cost. Unless otherwise called for by the Cont ract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Preservation of Historical and Archeological Resources
1. General. If, in the performance of the Work, Contractor should unearth cultural resources ( for example, human re mains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor notify the Construction/Archeological Monitor and/or the Stadium Manager Representative immediately, giving the location and nature of the f indings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the Construction/Archeological Monitor and/or Stadium Manager within 2 Days.
2. Procedures. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the cultural resource.
If directed by the Stadium Manager Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the Stadium Manager Representative and the C.
D.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-99- 01 00 00 – GENERAL REQUIREMENTS
Construction/Archeological Monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any Stadium Manager directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents.
3. Contractor’s Liability. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor sh all be principally responsible for all co sts of mitigation and/or restoration of cu ltural resources r elated to the unauthorized actions identified above. Contractor sha ll be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of un authorized activities th at damage cultural resources and sh all indemnify Stadium Manager pursuant to the Contract Documents.
4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Dust and Pollution Control
1. Contractor shall provide all necessary material, equipment and labor to prevent and control the emission of dust and any other potential pollutant on site.
2. Contractor shall not discharge into the atmosphere from any source smoke, dust or other air co ntaminants in violation of the law, ru les, and regulations of t he governing agency.
3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.
Fugitive Dust
NOT USED.
Management of Storm, Surface and Other Waters
1. Storm water, surface water, groundwater, and nuisance, or other waters may be encountered at various times during construction of the Project. Federal and State laws require the Stadium Manager and its contractors to manage such waters pursuant to the requirements of California State Water Resources Control Board Order Number 2009-0009-DWQ, the Federal Clean Water Act, and the California Porter Cologne Water Quality Control Act. Contractor acknowledges that it has investigated the risk arising from such waters in conjunction with the Project, and assumes any and all risks and liabilities arising therefrom.
E.
F.
G.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-100- 01 00 00 – GENERAL REQUIREMENTS
2. The Contractor shall perform all construction operations in such a manner as to comply, and ensure all subcontractors to comply, with all a pplicable Fe deral, State, and local laws, orders, and regulations concerning the control and abatement of water pollution; and all terms and conditions of any applicable permits issued for the Project. In the event there is a conflict between Federal, State, and local laws, regulations, and requirements, the most stringent shall apply.
3. Contractor violations. If noncompliance should occur, the Contractor shall report this to the Stadium Manager Representative imm ediately, with the specific information submitted in writing within 2 Days. Consistent violations of applicable Federal, State, or local laws, orders, regulations, or Water Quality Standards may result in Stadium Manager stopping all site activity until compliance is ensured. The Contractor shall not be entitled to any change in Contract Price or Contract Times, claim for damage, or additional compensation by reason of such a work stoppage.
Corrective measures required to bring activities into compliance shall be at t he Contractor's expense.
4. Compliance with Construction General Storm water Permit. Contractor shall be required to comply with all aspects of the State Water Resources Control Board (State Board) Water Quality Order No. 2009-0009-DWQ, Nat ional Pollutant Discharge Elimination System Ge neral Permit for Storm Water Discharges Associated wi th Constructi on Activity (Permit) for all projects that involve construction on or disturbance of one acre or more of land or which are part of a larger common area of development.
(a) Contractor shall pr epare and implement a Storm Water Pollut ion Prevention Plan (SWPPP) for the Project site based on the appropriate Risk Level requirements, and draft and coordinate submittal of all Permit r elated documents with Stadium Manager ’s Legally Responsible P erson and/or Authorized Signatory as those te rms are defined in t he Permit. The Contractor shall submit the SWPPP to the Stadium Manager Representative for review not less t han fifteen ( 15) Days prior to the sta rt of on- site construction work. Stadium Manager will file the Notice of Intent and pay the filing fee.
(b) The SWPPP shall be developed by a Qualified SWPPP Developer and implemented by a Qualified SWPPP Practitioner as those terms are defined in the Permit and shall include industry standard requirements for water quality control including but not be limited to the following:
(1) Sediment and erosion control measures to manage sediment and erosion including vegetative practices, st ructural cont rol, silt fences, straw dikes, sediment controls or operator controls as appropriate.
Storm water management measures shall be instituted as required, including velocity dissipate rs, and solid waste con trols shall address controls for building materials and offsite tracking of sediment. (2) Wastewater and storm water management controls to divert offsite surface flows around the Project site and to divert surface flows within the Project area away from areas of open earth or stockpiles of building and other materials. Wastewater from general construction activities, such as drain water collection, aggregate processing, concrete batching, drilling,
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-101- 01 00 00 – GENERAL REQUIREMENTS
grouting, or other construction operations, shall not enter flowing or dry watercourses without having met the authorized non-storm water discharge requirements lis ted in State Board Water Quality Order No. 2009-0009-DWQ, Section III.C., including proper notification to the Regional Water Board.
(3) Pollution pr evention measures inclu ding methods of dewatering, unwatering, excavating, or stockpilin g earth and rock materials which include prevention measures to control silting and erosion, and which will intercept and settle any runoff of sediment-laden waters. (4) Turbidity prevention measures for prevention of excess turbidity including, but are not restricted to, intercepting ditches, settling ponds, gravel filter entrapment dikes, flocculating processes, recirculation, combinations thereof, or other approved methods that are not harmful to aquatic life. All such wastewaters discharged into sur face waters, shall contain the least concentration of settleable material possible, and shall meet all conditions of Section 402, the National Pollutant Discharge Elimination System (NPDES) permit.
(5) Overall construction site management measures to address changes at the Project site as the Project moves through different phases and changes that account for rainy and dry season management practices. (6) Pollution c ontrol measures and con struction act ivity methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes, into streams, flowing or dry watercourses, lakes, wetlands, r eservoirs, or underground water sources. Such pollutants and wastes include, but are not restricted to:
refuse, garbage, cement, sanitary waste, industrial waste, hazardous materials, ra dioactive su bstances, oil and other petroleum products, aggregate processing, tailings, mineral salts, and thermal pollution. (7) Control measures f or stockpiled or de posited materials prohibiting the stockpile or deposit of excavated materials, or other construction materials, near or on stream banks, lake shorelines, or other watercourse perimeters where they can be washed away by high water or storm runoff, or can, in any way, encroach upon the watercourse. (8) Develop and implement a Rain Event Action Plan (REAP), if required, that must be designed and implemented to p rotect all ex posed portions of the site 48 hours prior to any likely precipitation event. (9) Monitoring, r eporting and record keeping, as necessary to achieve compliance with applicable Permit requirements, including but not limited to annual reports and rain event reports.
(c) Before any Permit related documents, including the SWPPP, rain event reports, or annual reports may be submitted to the State Board or implemented on the Project site, they must first be reviewed and approved by Stadium Manager. (d) Stadium Manager retains the right to procure and maintain coverage under the Permit for the Project site if the Contractor fails to draft a SWPPP or other
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-102- 01 00 00 – GENERAL REQUIREMENTS
Permit related document, or fails to proceed in a manner that is satisfactory to Stadium Manager. Stadium Manager reserves the right to implement its own SWPPP at the Project site, and hire additional contractors to maintain compliance. Whether Contractor has adequately maintained complian ce with the Permit shall be Stadium Manager’s sole determination. In the event that Contractor has failed or is unable to maintain compliance with the Permit, any costs or fines incurred by Stadium Manager in implementing a SWPPP, or otherwise maintaining compliance with the Construction General Permit shall be paid by the Contractor.
(e) Failure to implement the SWPPP or otherwise comply with the Permit is a violation of federal and state law. Contractor hereby agrees to indemnify the Indemnified Parties as required by the Contract Documents for any noncompliance or alleged noncompliance with the Permit arising out of or in connection wi th the Project, except f or liability resulting fr om the sole established negligence, willful misconduct or active negligence of the Indemnified Parties. Stadium Manager may seek damages from Contractor for delay in completing the Contract in accordance with the Contract Documents, caused by Contractor’s failure to comply with the Permit.
5. In addition to compliance with the Permit, Contractor shall comply with the lawful requirements of any applicable municipality, district, drainage district, flood control district, and other local a gencies regarding discharges of sto rm water, surface water, groundwater or other nuisance waters off of the Project site.
6. Oil storage tanks managem ent.
(a) Storage tank placement. All oil or other petroleum product (hereinafter referred to collec tively as oil) storage tanks sh all be placed at least 20 feet from streams, flowing or dry watercourses, lakes, wetlands, reservoirs, and any other water source.
(b) Storage area dikes. Storage areas shall be diked at least 12 inches high or graded and sloped to permit safe containment of leaks and spills equal to the capacity of all tanks an d/or containers loca ted within each area, plus a sufficient amount of freeboard to contain the 25-year rainstorm. (c) Diked area barriers. Diked areas shall have an impermeable barrier at least 10 mils thick. Areas used for refueling operations shall have an impermeable liner at least 10 mils thick buried under 2 to 4 inches of soil. (d) Spill Prevention Control and Countermeasure Plan (SPCC). Where the location of a construction site is such that oil from an accidental spillage could reasonably be expected to enter into or upon the navigable waters of t he United States or adjoining shorelines, and the aggregate storage of oil at the site is over 1,320 gallons or a single container has a capacity in excess of 660 gallons, the Contractor shall prepare an SPCC Plan. The Contractor shall submit the SPCC Plan to the Stadium Manager’s Representative at least 30 days prior to delivery or storage of oil at the site. The Plan must have been reviewed and certified by a registered professional engineer in accordance with 40 C.F.R., part 112
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056
-103- 01 00 00 – GENERAL REQUIREMENTS
7. Underground tank prohibition. The Contractor shall not use underground storage tanks.
8. Construction safety standards. The Contractor shall comply with the sanitation and potable water requirements of Section 7 of United States Bureau of Reclamation's publication “Reclamation Safety And Health Standards.”
9. Other Permits.
(a) Other permits applicable to the Project are listed in the Special Conditions.
The Contractor shall obtain all other necessary licenses and permits. (b) Monitoring. The Contractor is required to conduct monitoring in order to meet the requirements of the permits, which may include sampling, te sting and inspections.
(c) Recordkeeping. The Contractor shall retain all records and data required by the permits for the time specified in the contract.
10. Cost. Except as specified herein, t he cost of complying with this Section sha ll be included in t he Schedule of Pay Items for work which necessitate the water pollution prevention measures required by this paragraph.
Federal Aviation Association (FAA) Notice and Coordination.
1. Any temporary construction activity that exceeds 200 feet above ground level limitation requires the Contractor to give notice, coordinate and schedule the temporary construction activity with the FAA in advance of the activity. The Stadium Manager recommends two (2) weeks advance notice to the FAA, but it is the responsibility of the Contractor to obtain approval from the FAA prior to the activity. An example of an activity that might exceed the 200-foot elevation ceiling is a temporary crane operation to lift signs into place. The permanent location of any part of any sign installed as part of the Project may not exceed the 200- foot elevation ceiling above ground level in accordance with FAA restrictions.
Playing Surface Restriction.
1. At no time will the Contractor be allowed to use the turf playing field on the Project site to operate equipment, set up cranes or stage materials or equipment. All construction operations shall be conducted outside the limits of the turf playing field on the Project site.
END OF GENERAL REQUIREMENTS
H.
I.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056 104 TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
SUMMARY
This Project retrofits existing office and locker room spaces in two locations on the field level of Levi’s Stadium as indicated in the Project Plans, Specifications and Signage Documents.
SCOPE OF WORK
1. Base Bid Scope: Retrofit Auxiliary Locker Rooms in Two Locations a. Contractor shall conduct renovations to the designated office space and locker room areas, including all selective demolition, modifications of non-structural walls, addition of doors, electrical and lighting work , signage and all other work shown on the Plans and Specifications referenced below.
2. The Contractor shall provide all materials, equipment, tools, labor, supervision and project management necessary to complete the Project. Except as otherwise specified herein, Contractor is responsible for obtaining all permits and approvals from authorities having jurisdiction over the Project as may be necessary to complete the Project.
3. Refer to the Plans and Specifications referenced below for additional information.
PLANS AND SPECIFICATIONS
1. Follow the hyperlink to download the following Plans and Specifications and permit card for this Project:
Retrofit Auxiliary Locker Room Project Plans and Specifications
PERMITS
The Stadium Manager has obtained the relevant building permit from the City of Santa Clara for this Project (BLD22-67788). Contractor shall retrieve the building permit at the City of Santa Clara Permit Center, located at 1500 Warburton Avenue, Santa Clara, CA 95050, prior to starting the Work.
GENERAL REQUIREMENTS
1. Contractor shall provide protection for all existing building components beneath and around the work. Any damage to existing building components caused by contractor shall be immediately repaired or replaced at contractor’s sole expense in a manner acceptable to and approved by Stadium Manager.
2. In all active Work areas, Contractor shall provide, install and maintain all necessary barricades and warnings to prohibit pedestrian access into any affected Work area. This not only includes areas surrounding the Work, but also includes areas below the Work. Levi’s Stadium is an active building containing employees, guests, and other contractors on a daily basis.
3. Cleaning and Protection
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056 105
a. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Pro ject site. Secure, locate and position all unused materials and equipment, including man lifts, to the satisfaction of Stadium Manager. b. Protect all adjacent equipment, material, and property. c. Upon completion of the Work, remove unused materials, debris, containers, footing forms and equipment from the Project site. Remove protective coverings and clean the exposed surfaces of the Work to remove dirt, stains and other substances, by methods as recommended by manufacturers.
MATERIALS
1. Contractor shall perform the Work in accordance with the requirements specified in the Technical Specifications and Plans and Specifications for the Base Bid Scope.
2. Refer to the Notice Inviting Bids regarding requirements associated with “or -equal” substitutions. Contractor shall be solely responsible for ensuring and verifying the parts, equipment, and materials required to complete all Work on the Project, including any approved “or-equal” substitutes, are compatible with existing equipment and systems.
SUBMITTALS
1. Contractor shall submit parts and pieces identified in the “Materials” section of this document to Stadium Manager or its designee for review and approval.
INSTALLATION
1. The Contractor is responsible for the installation and material requirements per the manufacturer requirements. Contractor shall provide all tools, labor, materials, and accessories necessary to complete the installation per the manufacturer requirements.
2. The Project site is Levi’s Stadium, which is located at the following address:
Levi’s Stadium
4900 Marie P. DeBartolo Way
Santa Clara, CA 95054
SCHEDULE
1. Delivery and installation of materials is required within the Contract Time specified in the Contract Documents. Contractor shall coordinate with Stadium Manager to schedule delivery, site access, and installation of materials.
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056 106 EXHIBIT “A”
Change Order Form
EXHIBIT “A”
CHANGE ORDER FORM
Forty Niners Stadium Management Company LLC
Contract Change Order #
Project: Change Order No.:
Orig. Contract Amt.:
$
Days
Contract No.:
Contractor: Prev. Appvd. Changes: $ Days
Owner: Forty Niners Stadium Management
Company LLC
This Change: $ Days
Revised Contract Amt.: $ Days
This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and Forty Niners Stadium Management Company LLC, otherwise referred to as Owner.
Item
No.
Description of Changes
Increase/
(Decrease)
in Contract
Amount
Contract
Time
Extension,
Days
1 2
Totals
$
4900 Marie DeBartolo Way
Santa Clara, CA 95054
Levi’s Stadium Women’s Locker Room Project
RFB Number: RFB-FY23-0056 107 EXHIBIT “A”
Change Order Form
The amount of the Contract will be increased by the sum of $_______________ and the Contract Time shall be extended by ____ calendar days. The undersigned Contractor approves the foregoing Change Order #___ as to the changes, if any, in the Contract Price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order #___. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the Contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner.
Contractor accepts the terms and condition s stated above as full and final settlement of any and all claims arising out of or related to the subject of this Change Order and acknowledges that the compensation (time and cost) set forth herein comprises the total compensation due for the work or change defined in the Change Order, including all impact on any unchanged work. By signing this Change Order, the Contractor acknowledges and agrees that the stipulated compensation includes payment for all Work contained in the Change Order, plus all payment for any acceleration or interruption of schedules, extended overhead costs, delay, and all impact or cumulative impact on all Work under this Contract. The signing of this Change Order acknowledges full mutual accord and satisfaction for the change and that the stated time and/or cost constitute the total equitable adjustment owed the Contractor as a result of the change. The Contractor hereby releases and agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any furt her claim or request for
equitable adjustment of any type, for any reasonably foreseeable cause that shall arise out of, or as a result of, this Change Order and/or its impact on the remainder of the Work under the Contract.
Accepted:
(Signature) Contractor’s Authorized Representative Date
Recommended:
(Signature) [**INSERT NAME, TITLE**] Date
Approved:
(Signature) [**INSERT NAME, TITLE**] Date
Item
No.
Justification for Change(s)
1 2
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
24-1400 Agenda Date: 1/9/2024
REPORT TO COUNCIL
SUBJECT
Public Hearing: Action on Architectural Review for a Single-Family Residential Addition at 1485 Bellomy Street.
COUNCIL PILLAR
Promote and Enhance Economic, Housing and Transportation Development
BACKGROUND
On October 10, 2023, the City Council reviewed and continued (6-0-1) the public hearing on the request to rezone the property located at 1485 Bellomy Street from Planned Development (PD) to a modified PD. The proposed rezoning would have allowed a 615 square foot first-floor addition and 1,008 square foot second-floor addition to an existing single-family residence on the subject property.
At the City Council meeting, three community members spoke in support of the project and seven spoke in opposition with concerns regarding the proposed size of the residence relative to the lot size, interface with an adjacent historic property, and lack of a step back of the proposed second floor addition. The City Council referred the project to Planning staff to work with the applicant on a redesign to address these issues and then to subsequently return to City Council for consideration.
DISCUSSION
The applicant submitted a redesign of the project that modifies the proposal to provide: 1) a two-car tandem garage instead of a one car garage; 2) a reduction of one half bathroom; 3) incorporation of a lower roof pitch; 4) a reduction of the overall height to 22’-1”; and 5) a step back of one foot on each side of the second story. The revised project would result in a 2,542 square foot residence with four bedrooms, three bathrooms, and a two-car tandem garage. The previous design would have resulted in a 2,536 square foot residence with four bedrooms, three and a half bathrooms and only one garage space.
Conformance to Planning Development Zoning
The existing PD zoning for the Project Site is conditioned to require two covered parking spaces in the event of any addition greater than 500 square feet or that results in more than three bedrooms.
The project meets the description in terms of square footage and number of rooms, and as proposed on October 10, 2023 only provided a one-car garage, which required a rezoning to a new PD that would not have those parking standards to implement the project. After the hearing, the applicant initially revised the project to provide a garage with two tandem spaces but not of the adequate length to meet City standards, and thus a rezoning was still proposed. The applicants have recently desired to revise the proposal to provide two tandem parking spaces that meet City standards. A condition has been added to the Conditions of Approval for the plans to be revised so that an interior length of the tandem garage be provided at a minimum of 40 feet, which is in the Zoning Code design standards for a two-car tandem garage. With this proposed redesign, the single family addition, City of Santa Clara Printed on 1/4/2024Page 1 of 3
powered by Legistar™
24-1400 Agenda Date: 1/9/2024
does not require a PD rezoning based upon the current PD zoning that allows expansion of the residence with the addition of a second parking space.
Architectural Review
Typically, the proposed second-story addition would be reviewed through a Development Review Hearing for Architectural Review process (Santa Clara City Code 18.76.020(c)(1)(D)), but an architectural review approval can instead be referred to the City Council (Santa Clara City Code,
18.76.020(j). In this case, the architectural review action was incorporated with City Council consideration of the proposed PD zoning at their October 10, 2023 meeting so that the project could be considered cohesively at a single public hearing. While a rezoning action is no longer required, the project’s Architectural Review decision is being provided for the City Council’s consideration to provide consistency with the review process as at the October 10, 2023 City Council meeting, Council directed the applicant to work on the redesign to address public comments.
Public comment on the project at the previous City Council meeting included comments recommending a lower eave and steeper roof design so that the second floor could be accommodated within the roof form, resulting in a lower roof profile and thereby providing more airspace and light between the house and neighboring property. As proposed in the applicant’s resubmittal, the redesigned second-story addition achieves mass reduction in the roof area by reducing height and adding second story step backs. The overall height was reduced to 22 feet, which is less than the maximum 25 feet height allowed for this property in the Zoning Code. The revised design has a one foot step back on both side elevations. Staff agrees with the applicant that further side yard step backs would significantly reduce the livable second-floor area of the residence due to the narrow width of the existing lot and structure. The residence has an existing narrow width of about 22 feet.
The second-story is also designed with substantial front and rear step backs from the first floor wall, with a 11 foot 10-inch step back from the first floor garage and front wall of the residence, and a seven foot seven inch step back from the first floor rear wall of the residence. These step backs are not generally required in the Code and exceed the amount of step backs at the front and rear of the residence as recommended by the City’s Single-Family Design Guidelines. These step backs would significantly reduce the visual impact of the second floor to promote neighborhood compatibility. The Single-Family Design Guidelines suggest three- to five- foot step backs for all sides of the second- story addition.
Conclusion
Staff supported the prior version of the project as it generally conformed with applicable City policies set forth in the Zoning Code and Design Guidelines. The proposed redesign incorporates additional measures to address neighborhood concerns and so is an improvement over the prior project design.
For these reasons staff continues to recommend approval of the project.
ENVIRONMENTAL REVIEW
The actions being considered is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(e)(2) (Class 1 -- Existing Facilities), in that the activities consist of a rezone and the addition to an existing structure that (1) will not result in an increase of more than 10,000 square feet, (2) the project is in an area where all public services and facilities are available, and (3) the area in which the project is located is not environmentally sensitive. Here, the project is adding 1,629 square feet to an existing single-family residence in an City of Santa Clara Printed on 1/4/2024Page 2 of 3
powered by Legistar™
24-1400 Agenda Date: 1/9/2024
established residential neighborhood.
FISCAL IMPACT
There is no fiscal impact to the City for processing the requested application other than administrative time and expense typically covered by processing fees paid by the applicant.
COORDINATION
This report has been coordinated with the City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library. Furthermore, public outreach for the project is consistent with City Council Resolution No. 17-8456, regarding public outreach policy.
On December 22, 2023, the notice of public hearing for this item was posted in three conspicuous places within 300 feet of the project site and was mailed to property owners within 300 feet of the project site boundaries in the Old Quad District. The Planning Division did not receive public comment during the preparation of this staff report.
ALTERNATIVES
1. Deny the Architectural Review of the proposed first- and second-story addition at 1485 Bellomy Street.
2. Provide alternative design direction and recommend approval of a first-and second-story addition at 1485 Bellomy Street.
RECOMMENDATION
1. Determine the project to be categorically exempt from CEQA under Class 1(e)(2) (Existing Facilities).
2. Adopt a resolution to approve an Architectural Review of the proposed first- and second-story addition at 1485 Bellomy Street, subject to conditions of approval.
Reviewed by: Reena Brilliot, Acting Director of Community Development Approved by: Jovan D. Grogan, City Manager
ATTACHMENTS
1. City Council Staff Report of October 10, 2023
2. Resolution - Architectural Review
3. Conditions of Approval
4. Development Plans
City of Santa Clara Printed on 1/4/2024Page 3 of 3
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1090 Agenda Date: 10/10/2023
REPORT TO COUNCIL
SUBJECT
Public Hearing: Action on a Rezone to Planned Development and Architectural Review for a First- and Second-Story Addition to a Single-Family Residence at 1485 Bellomy Street
COUNCIL PILLAR
Promote and Enhance Economic, Housing and Transportation Development
BACKGROUND
The property owner at 1485 Bellomy is requesting a Planned Development (PD) zoning to allow a 615 square foot first-floor addition and 1,008 square foot second-floor addition to their home. These additions would result in a 2,291 square foot single-family residence with four bedrooms and three and a half bathrooms with the existing one-car garage to remain.
A PD rezone is a legislative action that allows for projects to deviate from the underlying zoning. The development plan and its standards become the zoning for the site unless modified through an amendment.
The subject site is currently zoned Planned Development. The existing PD zoning was granted in 2016 to allow the subdivision of a larger property into the two current lots at 1479 Bellomy Street and 1485 Bellomy Street, both of which are substandard lots. This existing Planned Development also limited any addition to the subject lot, 1485 Bellomy Street, to not exceed 500 square feet, nor result in a dwelling with more than three bedrooms total unless two covered parking spaces are provided and the addition otherwise complies with the development standards of the R1-6L Zoning District.
The proposal includes the retention of the one covered parking space currently on the site but would not add a second parking space. Thus, the current PD Zoning District does not allow the proposed addition, which is greater than 500 square feet. As such, the applicant has proposed to rezone the lot to a new PD zoning district to allow for a larger house with four bedrooms while providing one covered parking space.
The property is not listed as a historic resource on the City’s Historic Resources Inventory (HRI), but it is within 200 feet of two listed historic resources at 1479 Bellomy Street and 1456 Bellomy Street.
As indicated in the City’s Historic Preservation Ordinance, architectural review applications for properties within 200 feet of sites listed on the Historic Resources Inventory are referred to the Historical and Landmarks Commission (HLC) for their review of the project for neighborhood compatibility and consistency with the City’s Design Guidelines. The HLC reviewed the proposed project at two publicly noticed meetings. On December 1, 2022, the HLC heard the proposed project and made several recommendations. The applicant revised the project to address the recommendations made. On February 2, 2023, the HLC reviewed the revised project and recommended denial (6-0-1) of the project. More information on the HLC process is described in the Planning Commission staff report (Attachment 1).
City of Santa Clara Printed on 10/5/2023Page 1 of 4
powered by Legistar™
23-1090 Agenda Date: 10/10/2023
The project was presented before the Planning Commission at a publicly noticed meeting on August 23, 2023. The Planning Commission staff report (Attachment 1) provides an analysis of the project’s conformance with the General Plan, Zoning, and Single-family Design Guidelines. The Planning Commission recommended approval of the project (4-3).
DISCUSSION
At the August 23, 2023 Planning Commission meeting, staff presented an overview of the proposal, site conditions, consistency with the General Plan and Zoning requirements, proposed architecture, and conformance with the requirements of the California Environmental Quality Act (CEQA). The applicant then made a presentation highlighting the timeline for development, project improvements and additions, and architectural compatibility with surrounding neighbors.
Nine members of the public provided comments in person and online via Zoom. Six members spoke against the project with opposition to the height, mass, and nonconformance to the existing Conditions of Approval of the current Planned Development. Three members spoke in favor of the project with support for housing needs stating that it would be reasonable in scale and typical for a Single-family Zoning District.
Following public comments, the Planning Commission discussed the project and entitlements under their purview. The Planning Commission then concluded deliberations and adopted (4-3 vote) resolutions to recommend approval of the rezone from PD to PD to allow the proposed first- and second-story addition as shown on the development plans.
Planning Development Zoning
The current PD zoning district requires two covered parking spaces to allow for an addition over 500 square feet with greater than three bedrooms. The proposal retains one covered parking space but does not propose a second covered parking space. It is common now to see house expansions that do not provide additional parking given that recent State laws stipulate that no additional parking can be required for Accessory Dwelling Units. The applicant is proposing to rezone to a new Planned Development to allow for an expansion while retaining one parking space.
Architectural Review
Typically, the proposed second-story addition would be reviewed through a Development Review Hearing for Architectural Review, but any architectural approval can be instead referred to the City Council. In this case the architectural review action has been incorporated with City Council consideration of the proposed PD zoning.
The massing of the proposed second-story addition meets the intent of the Single-Family Design Guidelines to reduce massing and bulky appearance of two-story additions. First, the overall height is slightly less (24 feet) than what is normally allowed for single-family residences (25 feet). Second, the second-story is designed with substantial step backs from the first floor wall, with a 10’ to 13’-10” step back from the first floor garage and front wall of the residence, and a 9’-7” step back from the first floor rear wall of the residence. The proposed second-story would be set 13’-10” behind the front façade of the HRI property to the east. These step backs are not generally required in the Code, exceed the step backs at the front and rear of the residence recommended by the City’s Single- Family Design Guidelines, and significantly reduce the visual impact of the second floor to promote neighborhood compatibility. The Single-Family Design Guidelines suggests three- to five- foot step City of Santa Clara Printed on 10/5/2023Page 2 of 4
powered by Legistar™
23-1090 Agenda Date: 10/10/2023
backs for all sides of the second-story addition. The proposed second-story provides a larger front and rear step back, but does not have a step back on either of the two sides, as the narrow width of the existing lot and structure make such step backs overly restrictive on the livability of the residence.
The residence has an existing narrow width of 24 feet, and while stepping in the second-story sides by three to five feet would further reduce the massing, it would also reduce the width of the second story to only 14-18 feet.
ENVIRONMENTAL REVIEW
The actions being considered is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(e)(2) (Class 1 -- Existing Facilities), in that the activities consist of a rezone and the addition to an existing structure that (1) will not result in an increase of more than 10,000 square feet, (2) the project is in an area where all public services and facilities are available, and (3) the area in which the project is located is not environmentally sensitive. Here, the project is adding 1,623 square feet to an existing single-family residence in an established residential neighborhood.
FISCAL IMPACT
There is no fiscal impact to the City for processing the requested application other than administrative time and expense typically covered by processing fees paid by the applicant.
COORDINATION
This report has been coordinated with the City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library. Furthermore, public outreach for the project is consistent with City Council Resolution No. 17-8456, regarding public outreach policy.
On September 29, 2023, the notice of public hearing for this item was posted in three conspicuous places within 300 feet of the project site and was mailed to property owners within 300 feet of the project site boundaries in the Old Quad District. The Planning Division did not receive public comment during the preparation of this staff report.
ALTERNATIVES
1. Deny the Rezone from PD - Planned Development to PD to allow a 615 square foot first-floor addition and 1,008 square foot second-floor addition at 1485 Bellomy Street.
2. Deny the Architectural Review of the proposed first- and second-story addition at 1485 Bellomy Street.
RECOMMENDATION
1. Determine the project to be categorically exempt from CEQA under Class 1(e)(2) (Existing Facilities).
2. Adopt a resolution to approve a Rezone from PD - Planned Development to PD to allow a 615 square foot first-floor addition and 1,008 square foot second-floor addition at 1485 Bellomy City of Santa Clara Printed on 10/5/2023Page 3 of 4
powered by Legistar™
23-1090 Agenda Date: 10/10/2023
Street, subject to conditions of approval.
3. Adopt a resolution to approve an Architectural Review of the proposed first- and second-story addition at 1485 Bellomy Street, subject to conditions of approval.
Reviewed by: Andrew Crabtree, Director of Community Development Approved by: Jōvan D. Grogan, City Manager
ATTACHMENTS
1. Planning Commission Staff Report of August 23, 2023
2. Resolution Approval of the Rezoning from PD Zoning District to PD Zoning District
3. Resolution - Architectural Review
4. Conditions of Approval
5. Development Plans
City of Santa Clara Printed on 10/5/2023Page 4 of 4
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-678 Agenda Date: 8/23/2023
REPORT TO PLANNING COMMISSION
SUBJECT
Consideration of a Rezone to Planned Development for a First- and Second-story Addition at 1485 Bellomy Street
Applicant/Owner: Giovanni and Priscilla Bui
General Plan: Very Low Density Residential
Zoning: PD - Planned Development
Site Area: 3,833 square foot lot
Existing Site Conditions:
The subject property is a 3,833 square feet in size and developed with a one-story 668 square-foot, one-bedroom and one-bathroom residence with an attached one-car garage.
Surrounding Land Uses:
The site is bounded by single-family residences to the north, east, and west, and a two-story apartment complex and single-family residences to the south across Bellomy Street.
Issues:
Consistency with Zoning Ordinance and Single-Family Design Guidelines Staff Recommendation
:
That Planning Commission approve resolutions recommending City Council approve the Rezone to Planned Development to allow for a first and second-story addition to an existing single-family residence located at 1485 Bellomy Street, subject to conditions.
BACKGROUND
The applicant is requesting a Planned Development (PD) Rezoning to amend the existing Planned Development zoning designation to add more than 500 square feet and more than three bedrooms, which is not permitted under the current PD Zoning.
The property is not listed as a historic resource on the City’s Historic Resources Inventory (HRI). The property is located in the City’s Old Quad neighborhood within 200 feet of two listed historic resources at 1479 Bellomy Street and 1456 Bellomy Street. The Historical and Landmarks Commission (HLC) reviewed the proposed project at a publicly noticed meeting on February 2, 2023, and recommended denial of the project for the following reasons:
1. The proposed massing overshadows the adjacent HRI property at 1479 Bellomy Street.
2. The proposed addition would have an adverse effect to the historic fabric of the neighborhood
3. While other two-story residences exist nearby, the proposed design and massing would have City of Santa Clara Printed on 8/18/2023Page 1 of 4
powered by Legistar™
23-678 Agenda Date: 8/23/2023
a significant impact to the immediate setting.
4. Complying with the existing PD Zoning restriction limiting additions to no more than 500 square feet serves to prevent overshadowing of the HRI property at 1479 Bellomy Street.
DISCUSSION
The property owner at 1485 Bellomy is proposing a 615 square foot first-floor addition and 1,008 square foot second-floor addition that would result in a 2,291 square foot single-family residence with four bedrooms and three and a half bathrooms with the existing one-car garage to remain. The subject site was previously zoned as Planned Development to allow for the subdivision of a larger property into the two current lots, 1479 Bellomy Street and 1485 Bellomy Street. This Planned Development limited any addition to the subject lot, 1485 Bellomy Street, to not exceed 500 square feet nor result in a dwelling with more than three bedrooms total unless two covered parking spaces are provided; and, provided the addition complies with the development standards of the R1-6L Zoning District.
Historical and Landmarks Commission:
As indicated in the City’s Historic Preservation Ordinance, architectural review applications for properties within 200 feet of sites listed on the Historic Resources Inventory are referred to the Historical and Landmarks Commission (HLC) for their review of the project for neighborhood compatibility and consistency with the City’s Design Guidelines. As the proposed PD zoning will develop standards for which the subsequent architectural review will be based on the subject site, which is located within 200 feet of two listed historic resources at 1479 Bellomy Street and 1456 Bellomy Street, the project was referred to the HLC for their consideration and recommendation. The HLC heard the proposed project on December 1, 2022 and made the following recommendations:
· Reduce the 25-foot stucco wall on the sides of the proposed addition · Correct project data calculations and plan dimensions · Provide roof plans
· Provide sketch of the two-neighboring residences in similar scale in elevation · Explore basement addition instead of above ground addition · Meet maximum 40% lot coverage
· Change roof style to be compatible with the immediate neighborhood · Reduce the mass to be compatible with the adjacent HRI property The applicant revised the project design to address the recommendations made by the Historical and Landmarks Commission. The project was then heard a second time by the HLC at their February 2, 2023 meeting. While the revised design improved consistency with the Single-Family Residential Design Guidelines to reduce the mass and bulk of the second-story addition, the HLC made a recommendation of denial as previously noted in this report.
Since the February HLC meeting, the property owner provided one additional change to lower the height of the second-story to 24 feet, whereas 25 feet is the maximum allowed for a single-family residence. The project is now referred to the Planning Commission for recommendation of the PD - Rezone to City Council. If approved by the City Council, the proposed project will be referred to the Development Review Hearing for review of the second-story addition.
City of Santa Clara Printed on 8/18/2023Page 2 of 4
powered by Legistar™
23-678 Agenda Date: 8/23/2023
Zoning:
The proposed PD - Planned Development zoning for the property is desired in that the PD district is intended to accommodate development that is consistent with the City’s General Plan land use designation of Very Low Density Residential, compatible with the existing community, and that utilizes imaginative planning and design concepts that would be restricted in other zone districts. The proposed PD zoning provides flexibility and variation in development standards from the R1-6L Single-Family Zoning District standards, by allowing for reduced front and side yard building setbacks, reduced lot width and area, increased lot coverage, and reduced parking, as the lot size is small and substandard from single family residential lot in conventional zoning districts. The PD rezone would also remove the existing condition that does not allow an addition that would exceed 500 square feet nor result in a dwelling with more than three bedrooms total unless two covered parking spaces are provided. The PD zoning would retain the existing 220 square foot one-car garage serving the existing dwelling. For reference, a single-family home that contains a one-car garage, rather than the two as required under the current Zoning Ordinance, are permitted to have an addition of up to 500 square feet or an addition that results in no more than three bedrooms, without providing a second covered parking space.
The subject lot was created as substandard with the approval of the PD Zoning on the site. The lot width is 35.25 feet, where 60 feet is the standard, with existing side yard setbacks of 5’11” and 5’2”, where five feet is the standard. As such, the existing house has a narrow width of 24 feet, which for reference is only slightly larger than a typical interior dimension of a 20’ by 20’ two-car garage. The proposed first and second story addition to the existing residence is consistent with the R1-6L Single- Family standards for setbacks, height and lot coverage even though the lot size of approximately 3,824 square feet is substandard to the code required minimum of 6,000 square feet.
The massing of the proposed second-story addition meets the intent of the Single-Family Design Guidelines to reduce massing and bulky appearance of two-story additions.
First, the overall height has been reduced to 24 feet instead of the 25 feet maximum allowed for single-family residences. Secondly, the second-story is designed with substantial setbacks from the first floor wall, by providing a 10’-13’10” stepback from the first floor garage and front wall of the residence, and a 9’7” stepback from the first floor rear wall of the residence. The proposed second- story would be set 13’10” behind the front façade of the HRI property to the east. The Single-Family Design Guidelines suggests three to five feet step backs for all sides of the second-story addition.
The proposed second-story provides a larger front and rear stepback, but does not have a stepback on either of the two sides. The residence has an existing narrow width of 24 feet, and while stepping in the second-story sides by three to five feet would further reduce the massing, it would also reduce the width of the second story to 14-18 feet and reduce its useability.
Conclusion:
Approval of this project would provide an opportunity to retain high quality residential units and allow individual ownership. The proposal will help alter a property in a manner that is consistent with the General Plan Very Low Density Residential designation. The proposal includes different sized units and properties that will continue to contribute to the diversity of the City’s housing supply, contributing to a range of choices in housing tenure, type, size, location and affordability in the City. The project would not impact the integrity of nearby listed historic properties, in that the proposed two-story residence will be consistent with the objective standards in the R1-6L, Single-Family Zoning District.
City of Santa Clara Printed on 8/18/2023Page 3 of 4
powered by Legistar™
23-678 Agenda Date: 8/23/2023
ENVIRONMENTAL REVIEW
The proposed project is categorically exempt from the California Environmental Quality Act (CEQA) per Section 15301(e)(2) - Class 1 Existing Facilities, in that the activity consists of the addition to an existing structure that (1) will not result in an increase of more than 10,000 square feet, (2) the project is in an area where all public services and facilities are available, and (3) the area in which the project is located is not environmentally sensitive. Here, the project is adding 1,623 square feet to an existing single-family residence in an established residential neighborhood.
PUBLIC CONTACT
On March 30, 2023, notice of the June 14, 2023 hearing for this item was posted in three conspicuous locations within 300 feet of the project site and mailed to property owners within 300 feet of the project site. On June 14, 2023, the Planning Commission opened the public hearing and then continued the hearing to August 23, 2023 and additional noticing was not required.
RECOMMENDATION
Staff recommends that the Planning Commission:
1. Determine that the Project is categorically exempt under Class 1 (Existing Facilities) of the CEQA Guidelines;
2. Approve a resolution recommending that the City Council approve the Rezone to Planned Development to allow the first and second-story addition for the existing single-family residence at 1485 Bellomy Street, subject to conditions.
Prepared by: Steve Le, Senior Planner
Reviewed by: Alexander Abbe, Assistant City Attorney
Approved by: Lesley Xavier, Planning Manager
ATTACHMENTS
1. Excerpt of February 2, 2023 Historical and Landmarks Commission Meeting Minutes
2. Staff report of February 2, 2023 Historical and Landmarks Commission
3. Resolution Recommending City Council Approval of the Rezoning from PD to PD
4. Conditions of Approval
5. Development Plans
City of Santa Clara Printed on 8/18/2023Page 4 of 4
powered by Legistar™
City of Santa Clara
Meeting Minutes
Historical & Landmarks Commission
Draft
6:00 PM Virtual Meeting02/02/2023
Pursuant to California Government Code section 54953(e) and City of Santa Clara Resolution 22-9178, the Historical and Landmarks Commission meeting will be held by teleconference only.
No physical location will be available for this meeting; however, the City of Santa Clara continues to provide methods for the public to participate remotely:
• Via Zoom:
o https://santaclaraca.zoom.us/j/97233262035 or
o Phone: 1 (669) 900-6833
Webinar ID: 972 3326 2035
Public Comments prior to meeting may be submitted via email to [email protected] no later than noon on the day of the meeting. Clearly indicate the project address, meeting body, and meeting date in the email.
PUBLIC PARTICIPATION IN ZOOM WEBINAR:
Please follow the guidelines below when participating in a Zoom Webinar:
- The meeting will be recorded so you must choose 'continue' to accept and stay in the meeting. - If there is an option to change the phone number to your name when you enter the meeting, please do so as your name will be visible online and will be used to notify you that it is your turn to speak.
- Mute all other audio before speaking. Using multiple devices can cause an audio feedback. - Use the raise your hand feature in Zoom when you would like to speak on an item and lower when finished speaking. Press *9 to raise your hand if you are calling in by phone only. - Identify yourself by name before speaking on an item. - Unmute when called on to speak and mute when done speaking. If there is background noise coming from a participant, they will be muted by the host. Press *6 if you are participating by phone to unmute.
- If you no longer wish to stay in the meeting once your item has been heard, you may leave the meeting.
CALL TO ORDER AND ROLL CALL
Chair Leung called the meeting to order at 6:06 p.m.
Commissioner Michael Celso , Commissioner Amy Kirby, Chair Patricia Leung, Commissioner Kathleen Romano, Commissioner Ed Stocks, and Vice Chair Ana Vargas-Smith
Present 6 -
Commissioner Megan SwartzwelderAbsent 1 -