SEPTEMBER 2024 5.2-1 ADMINISTRATIVE DRAFT MND/IS
5.2. Agriculture and Forestry Resources
AGRICULTURE AND FORESTRY RESOURCES
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) pre -pared by the California Department of Con- servation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environ- mental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment Project; and forest carbon measurement method- ology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Convert Prime Farmland, Unique Farmland, or Farmland of State - wide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
☐ ☐ ☐ ☒
(b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
☐ ☐ ☐ ☒
(c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code §12220(g)), timberland (as defined by Public Resources Code §4526), or timberland zoned Timberland Production (as defined by Government Code
§51104(g))?
☐ ☐ ☐ ☒
(d) Result in the loss of forest land or conversion of forest land to non- forest use?
☐ ☐ ☐ ☒
(e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non -forest use?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.2.1. Setting
The proposed Project is located in a fully developed area and there is no agricultural activity or forestry resources along the proposed Project transmission line route and substations. The project area is not zoned for agricultural or forestry uses, nor is there agricultural or forestry activity in the vicinity of the proposed route (City of Santa Clara, 2014). The surrounding lands are designated as Urban and Built -Up Land under the California Department of Conservation (DOC) Farmland Mapping and Monitoring Program (FMMP), which identifies various categories of farmland throughout the State (DOC, 2022).
The properties in the areas along the proposed Project route are not under California Land Conservation Act of 1965 (referred to as the Williamson Act) contracts (DOC, 2017).
Regulatory Background
This section includes a description of the agriculture and forestry resources regulatory framework. There are no federal or local regulations associated with agriculture and forestry resources that are relevant to the proposed Project.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.2. AGRICULTURE AND FORESTRY RESOURCES
SEPTEMBER 2024 5.2-2 ADMINISTRATIVE DRAFT MND/IS
State
Farmland Mapping and Monitoring Program (FMMP). The FMMP was established in 1982 to identify vari- ous categories of farmland throughout California and to assess the location, quantity, and quality of agri- cultural lands and conversion of these lands to other uses. Every even -numbered year, FMMP issues a Farmland Conversion Report. FMMP data are used in elements of some county and city general plans, in regional studies on agricultural land conversion, and in environmental documents as a way of assessing project-specific impacts on Prime Farmland.
The DOC classifies lands as follows (DOC, 2016):
Prime Farmland: Land that has the best combination of physical and chemical properties for the pro - duction of crops
Farmland of Statewide Importance: Similar to Prime Farmland, but with minor shortcomings (e.g., steeper slopes, inability to hold water)
Unique Farmland: Land of lesser quality soils, but recently used for the production of specific high economic value crops. Land is usually irrigated, but may include non-irrigated orchards or vineyards as found in some climatic zones in California
Farmland of Local Importance: Land essential to the local agricultural economy Grazing Land: Land on which existing vegetation is suitable for livestock grazing. Urban and Built-Up Land: Land that is occupied by buildings or other structures at a minimum density of one unit to 1.5 acres (or approximately six structures to 10 acres). These lands are used for develop- ment purposes, including residential, commercial, industrial, construction, public administration, institutional, transportation yards, airports, cemeteries, golf courses, sewage treatment, sanitary land- fills, and water control structures.
Other Land: Land that is not in any other map category, such as waterbodies smaller than 40 acres; low density rural developments; confined livestock, poultry, or aquaculture facilities; and brush, timber, wetland, and riparian areas not suitable for livestock grazing. Water: Perennial waterbodies that are a minimum of 40 acres.
Williamson Act. The Williamson Act is intended to help preserve farmland by allowing counties to enter into contracts with private landowners for the purpose of restricting specific parcels of land to agricultural or related open space use in return for a reduction in assessed property taxes. The contracted land is then restricted to agricultural and compatible uses through a rolling- term, 10-year contract between the pri - vate landowner and the local government, which has the discretion to determine uses compatible with Williamson Act enrollment. As stated in Section 51222 of the California Government Code, the minimum acreage requirement for individual parcels to enter into Williamson Act contracts is 100 acres.
5.2.2. Environmental Impacts and Mitigation Measures
(a) Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as Shown on the Maps Prepared Pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to Non-agricultural use? NO IMPACT. The proposed Project route and the land in the project vicinity are designated as Urban and Built-Up Land on the FMMP maps and are not designated Farmland. Agriculture is not practiced in the area. The proposed Project would not result in conversion of Farmland to non-agricultural use.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.2. AGRICULTURE AND FORESTRY RESOURCES
SEPTEMBER 2024 5.2-3 ADMINISTRATIVE DRAFT MND/IS
(b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? The minimum acreage requirement for individual parcels to enter into Williamson Act contracts, as stated in Section 51222 of the California Government Code, is 10 acres. In addition, State CEQA Guidelines, Section 15206 does not regard the cancellation of less than 100 acres of land from Williamson Act to be of statewide, regional, or areawide significance.4
NO IMPACT. The City of Santa Clara does not participate in the Williamson Act. There is no designated zoning for agricultural use, and the City of Santa Clara General Plan does not include an Agriculture Element. The proposed Project route would not conflict with zoning for agricultural use. (c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
N
O IMPACT. The proposed Project route is in an urban area and is not forested. The proposed Project would not conflict with zoning for forest land, timberland, or timber production. (d) Would the project result in the loss of forest land or conversion of forest land to non-forest use? NO IMPACT. The proposed Project would not affect any forest land since the proposed route is located in an urban area that is not forested. There would be no conversion of forest land to non-forest use. (e) Would the project involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to non-agricultural use? N
O IMPACT. There is no Farmland, agriculture, or forestland along or near the proposed Project route. The proposed Project would not result in changes in the environment that would result in the conversion to non-agricultural or non-forest uses.
4 Section 15206(b)(3) states that projects of statewide, regional, or areawide significance include, “[a] project which would result in the cancellation of an open space contract made pursuant to the California Land Conservation Act of 1965 (Williamson Act) for any parcel of 100 or more acres.”
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-1 ADMINISTRATIVE DRAFT MND/IS
5.3. Air Quality
AIR QUALITY
Where available, the significance criteria established by the applicable air quality management district or air pollution con- trol district may be relied upon to make the following determi- nations. Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Conflict with or obstruct implementation of the applicable air quality plan?
☐ ☐ ☒ ☐
(b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable Federal or State ambient air quality standard? ☐ ☒ ☐ ☐
(c) Expose sensitive receptors to substantial pollutant concentra - tions?
☐ ☒ ☐ ☐
(d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.3.1. Setting
Criteria Pollutants. Air quality is determined by measuring ambient concentrations of criteria pollutants.
Air pollutants are those pollutants for which acceptable levels of exposure can be determined and for which standards have been set. The degree of air quality degradation is then compared to the current National and California Ambient Air Quality Standards (NAAQS and CAAQS). Unique meteorological conditions in California and differences of opinion by medical panels established by the California Air Resources Board (CARB) and the U.S. Environmental Protection Agency (U.S. EPA) cause considerable diversity between State and Federal standards currently in effect in California. In general, the CAAQS are more stringent than the corresponding NAAQS. The stand ards currently in effect in California are shown in Table 5.3-1.
Table 5.3-1. National and California Ambient Air Quality Standards Pollutant Averaging Time California Standards National Standards Ozone 1 hour
8 hour
0.09 ppm
0.070 ppm
—
0.075 ppm
Respirable Particulate Matter (PM10) 24 hour
Annual Mean
50 µg/m3
20 µg/m3
150 µg/m3
—
Fine Particulate Matter (PM2.5) 24 hour
Annual Mean
—
12 µg/m3
35 µg/m3
15 µg/m3
Carbon Monoxide (CO) 1 hour
8 hour
20 ppm
9.0 ppm
35 ppm
9.0 ppm
Nitrogen Dioxide (NO2) 1 hour
Annual Mean
0.18 ppm
0.030 ppm
—
0.053 ppm
Sulfur Dioxide (SO2) 1 hour
24 hour
3 hour
Annual Mean
0.25 ppm
0.04 ppm
—
—
—
0.14 ppm
0.5 ppm
0.03 ppm
Notes: ppm=parts per million; µg/m3= micrograms per cubic meter; “—“ =no standard Source: CARB (http://www.arb.ca.gov/research/aaqs/aaqs2.pdf), November, 2016.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-2 ADMINISTRATIVE DRAFT MND/IS
Table 5.3-2. Attainment Status for San Francisco Bay Area Attainment Status and Air Quality Plans. The
U.S. EPA, Air Resources Board ( ARB), and the
local air district classify an area as attainment,
unclassified, or nonattainment of a pollutant,
and these des ignations dictate the air quality
management planning activities needed make
future air pollutant reductions. The classification
depends on whether the monitored ambient air
quality data show compliance, insufficient data
available, or noncompliance with the ambient
air quality standards, respectively. Table 5.3-2
summarizes attainment status in the San Fran-
cisco Bay Area air basin for the criteria pollut-
ants under both the state and federal standards.
Regulatory Background
U.S. EPA/CARB Off-Road Mobile Sources Emission Reduction Program. The California Clean Air Act man- dates that CARB achieve the maximum degree of emission reductions from all off-road mobile sources in order to attain the state ambient air quality standards. Off -road mobile sources include construction equipment. Tier 1 standards for large compression-ignition engines used in off-road mobile sources went into effect in California in 1996. These standards and ongoing rulemaking jointly address emis sions of nitrogen oxides (NOx) and toxic particulate matter from diesel combustion. CARB is also devel oping a control measure to reduce diesel particulate matter emissions as well as NOx from in-use (exist ing) off- road diesel equipment throughout the State.
CARB Portable Equipment Registration Program. This program allows owners or operators of portable engines and associated equipment commonly used for construction or farming to register their units under a statewide portable program that allows them to operate their equipment throughout California without having to obtain individual permits from local air districts.
BAAQMD CEQA Guidelines Thresholds of Significance. The Bay Area Air Quality Management District (BAAQMD) provides the following thresholds as recommendations for use by lead agencies in the CEQA process. For construction -related criteria air pollutant emissions, construction of a project may cause a significant impact if it would:
Emit more than 54 pounds per day (lbs/day) of reactive organic gases (ROG) or volatile organic compounds (VOC);
Emit more than 54 lbs/day of nitrogen oxides (NOx);
Emit more than 82 lbs/day of PM10 from exhaust; or
Emit more than 54 lbs/day of PM2.5 from exhaust.
Similar thresholds exist for a project during operation along with a threshold for localized concentrations of CO greater than 9 ppm (8 -hour average) or 20 ppm (1 hour average). For PM10 and PM2.5 related to fugitive dust during construction, the BAAQMD recommends that each project should include best man - agement practices rather than achieve specific fugitive dust emissions thresholds. The basic construction emissions control measures appear in the BAAQMD CEQA Guidelines (BAAQMD, 2023).
Pollutant
California
Designation Federal Designation
Ozone (1 hour) Nonattainment Nonattainment
Ozone (8 hour) Nonattainment Unclassified/Attainment
PM10 Nonattainment Nonattainment
PM2.5 Attainment Attainment
CO Attainment Unclassified/Attainment
NO2 Attainment Unclassified/Attainment
SO2 California
Designation
Federal Designation
Source: BAAQMD, 2023.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-3 ADMINISTRATIVE DRAFT MND/IS
5.3.2. Environmental Impacts and Mitigation Measures
(a) Would the project conflict with or obstruct implementation of the applicable air quality plan? LESS THAN SIGNIFICANT – CONSTRUCTION. The BAAQMD is the primary agency responsible for managing local air quality and administering other California and federal programs ensuring implementation of the air quality management plan. The 2017 Bay Area Clean Air Plan is the BAAQMD’s current plan to achieve state and national ambient air quality standards, comply with Californi a and federal air quality planning requirements, and maintain healthy air in the San Francisco Bay Area.
The BAAQMD recommends evaluating whether local long-range plans: (a) support the primary goals of the 2017 Clean Air Plan; (b) include relevant control measures; and (c) do not interfere with implementa- tion of 2017 Clean Air Plan control measures. The BAAQMD’s 2017 Clean Air Plan anticipates that electricity consumption and demand for electricity will increase as a result of economic and demographic growth and due to increased electrification caused by shifting energy demand away from fossil fuels. The proposed Project would increase SVP’s system capacity and reliability and allow SVP to serve projected load growth. By improving the delivery of electricity to the transmission system, the Project would support the primary goals of the 2017 Clean Air Plan and increased electrifi cation of energy demands. No control measures from the plan would be directly applicable to the Project, and the Project would not disrupt or hinder implementation of any plan control measures.
A Project could be found inconsistent with the applicable air quality management plan or attainment plan if it could cause population and/or employment growth or growth in vehicle- miles traveled in excess of the growth forecasts included in the air quality attainment plan. SVP’s existing operations and mainte - nance group would assume inspection, patrol, and maintenance duties as needed. No additional staff would be required after project construction work is completed. Therefore, the Project would not conflict with or obstruct implementation of the applicable air quality plan. No impact would occur, and no mitiga- tion is required.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. Operational emissions would be limited to the vehicle and equipment used for periodic maintenance, repair, and inspection of the proposed Project. No additional operations staff would be hired by SVP as a result of the Project being put into service. Since the Project is unstaffed, o perational activities would not result in any net increase in mobile source emissions due to workers or staff maintaining the facility, and no new stationary sources are proposed.
As a result, operation of the proposed Project would not result in a cumulatively considerable net increase of any criteria pollutant. This impact would be less than significant, and no mitigation would be required during operations.
(b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable Federal or State ambient air quality standard?
L
ESS THAN SIGNIFICANT WITH MITIGATION - CONSTRUCTION. Construction of the proposed Project would include foundation excavation, power pole assembly and installation, and installation of travelers for the over- head transmission line construction option, and would include trenching, and vault installation for t he underground option. These activities during construction would generate emissions at the work area and along the roadways used to access the site.
Construction emissions would be caused by exhaust from vehicles and equipment (e.g., ozone precursor VOC and NOx, CO, PM10 and PM2.5) and fugitive dust that includes particulate matter from ground - disturbing activities. The mobile sources would include diesel-powered construction equipment such as cranes, lifts, loaders, an auger drill rig, and rollers, as well as small welders. Other mobile sources would include diesel and gasoline -powered vehicles for linework and trucks for deliveries of concrete, water, NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-4 ADMINISTRATIVE DRAFT MND/IS
and other materials. Outside of the work area, construction traffic would cause exhaust emissions from the trucks and other vehicles used by crews, materials, and equipment to access the work area.
Construction is expected to take approximately 14 months for the overhead alignment. The peak number of construction personnel would be approximately 25-30 workers, and traffic to and from the site during construction would be approximately 30-50 round trips daily. The proposed Project includes two options as described in the Project Description, Option 1 is a fully overhead configuration of the transmission line, while Option 2 is partially overhead and partially underground. In order to capture maximum emissions possible, the proposed Project was modeled with phases pertaining to the overhead configuration as well as underground.
Project-related construction emissions calculations were modeled using the California Emissions Estima - tor Model (CalEEMod), version 2022.1.1.22. The detailed emission calculations are based on the proposed workforce and types of equipment as described in Appendix C. The activity details that were modeled and the results appear in Appendix C. Table 5.3 -3 summarizes the maximum daily emi ssion rates of the pro - posed Project construction activity.
Table 5.3-3. Maximum Daily Unmitigated Construction Emissions (lbs/day) Construction Activity VOC NOx CO SO2
PM10
(exhaust)
PM2.5
(exhaust)
Demolition 2.27 22.57 21.79 0.05 0.82 0.76
Site Preparation, Foundations 1.55 15.91 18.96 0.05 0.51 0.47 Overhead Installation 1.71 16.75 21.09 0.04 0.45 0.42
Underground Trenching 0.79 8.90 13.37 0.03 0.19 0.19
Underground Installation 1.71 16.75 21.09 0.04 0.45 0.42 Paving 5.95 11.67 16.21 0.03 0.39 0.36
Maximum Daily
Construction Emissions 5.95 22.57 21.79 0.05 0.82 0.76
Threshold of Significance 54 54 None None 82 54
Exceedance? No No -- -- No No
Sources: BAAQMD, 2022. Appendix C.
Table 5.3-3 shows that Project construction would not exceed the thresholds for individually significant Project impacts. The thresholds of significance (BAAQMD, 202 2) recommended by the BAAQMD define mass emission rates that represent a potentially significant net increase for ozone precursor emissions (NOx or VOC) or exhaust emissions of particulate matter (PM10 and PM2.5). Construction-related criteria air pollutants would not exceed thresholds that indicate cumulatively considerable levels. For construc- tion dust, the BAAQMD recommends a qualitative approach emphasizing implementation of effective emissions control measures that avoid causing a cumulatively considera ble net increase. The qualitative approach to reducing dust reflects the nature of construction phase emissions that are generally short -
ter
m in duration.
Co
ncurrent construction of other projects near the Project site could result in increased local air quality impacts for the duration of simultaneous construction activities. Emissions generated by Project construc- tion would be temporary and variable and would be similar in nature to emissions from other typical and nearby construction activities. Simultaneous construction of other cumulative projects near the Project site would also be likely to implement general B AAQMD recommendations for minimizing air q uality impacts. All activities must comply with BAAQMD rules regarding dust control.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-5 ADMINISTRATIVE DRAFT MND/IS
To ensure that a cumulatively considerable net increase of emissions would not occur due to construction dust, basic construction emissions control strategies are drawn from BAAQMD guidance (BAAQMD, 2022).
The recommended emissions control measures appear in Mitigation Measure AQ-1.
With mitigation, construction of the Project would not result in a cumulatively considerable net increase of any criteria pollutants for which the region in is nonattainment, and the construction-related emissions would not substantially contribute to any air quality violation. This impact would be less than significant.
Mitigation Measure for Construction-Phase Air Quality
MM AQ-1 Implement Basic Construction Air Quality Mitigation. The Project shall ensure that basic construction emissions control measures are implemented as “Best Management Practices,” as follows:
All exposed soil surfaces (e.g., parking areas, staging areas, soil piles, and graded areas) shall be watered as needed, up to two times per day.
All haul trucks transporting soil, sand, or other loose material off-site shall be covered. All visible mud or dirt track-out onto adjacent public roads attributed to the Project shall be removed using wet power vacuum street sweepers at least once per day, if needed. The use of dry power sweeping is prohibited.
All areas to be paved shall be completed as soon as possible. Foundation pads shall be laid as soon as possible after grading.
Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]) .
Clear signage regarding idling shall be provided for construction workers at all access points.
All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. Post a publicly visible sign with the telephone number and person to contact at SVP regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD’s phone number shall also be visible to ensure compliance with applicable regulations.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. Operational emissions would be limited to the vehicle and equipment used for periodic maintenance, repair, and inspection of the proposed Project. SVP’s existing operations and maintenance group would assume inspection, patrol, and maintenance duties as needed. No additional staff would be required after project construction work is completed. Operational activities would not result in any net increase in mobile source emissions due to workers or staff main- taining the facility, and no new stationary sources are proposed. As a result, operation of the NRS -KRS Project would not result in a cumulatively considerable net increase of any criteria pollutant. This impact would be less than significant, and no mitigation would be required during operations. (c) Would the project expose sensitive receptors to substantial pollutant concentrations? L
ESS THAN SIGNIFICANT WITH MITIGATION – CONSTRUCTION. Construction would generate toxic air contaminants routinely found in the exhaust of gasoline powered motor vehicles and of diesel-fueled equipment, including diesel particulate matter (DPM). The Project would not involve any permanent or stationary NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.3. AIR QUALITY
SEPTEMBER 2024 5.3-6 ADMINISTRATIVE DRAFT MND/IS
sources of air pollution, but construction would temporarily bring construction equipment into the Project site and onto roadways accessing the site.
Sh
ort-te
rm emissions associated with construction would occur onsite and along the roadways accessing the work areas, and the activities would be variable in sequence and timing. The proposed activities include mobilizing vehicles and equipment, construction, crews, and materials, and use of fleet of diesel-powered offroad equipment on the site to install the Project components. Construction equipment and vehicles would access and move within the Project site throughout the construction duration of approximately 14 months. Within the overall duration, the emissions would vary and would not occur for long periods; this minimizes the potential that any location would be exposed to substantial pollutant concentrations.
Co
nstruction contractors would be required to control dust to avoid creating a nuisance, and the off-road diesel-fueled fleets regulation requires achieving a feasible level of control to minimize diesel exhaust emissions. Implementing “Best Management Practices” would minimize the emissions of pollutants, inclu- ding dust and DPM or other toxic air contaminants. Mitigation Measure AQ- 1 would control dust, limit equipment idling times, and properly maintain equipment to reduce construction phase emissions to levels below the applicable thresholds of significance. Implementing the best practices identified in the mitigation measure would ensure that receptors would not be exposed to substantial concentrations.
Impacts under this criterion would be less than significant with mitigation for construction emissions.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. During Project operations, emissions would result from limited use of vehicles for routine maintenance, repair, and inspection. Operational activities would not result in any net increase in mobile source emissions that could expose sensitive receptors to substan- tial concentrations of air pollutants. This impact would be less than significant, and no mitigation would be required during operations.
(d) Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
L
ESS THAN SIGNIFICANT. The proposed Project would not include any sources likely to create objectionable odors. Construction would involve the temporary use of vehicles and construction equipment and materials, such as fuels and lubricants, that may generate intermittent, minor odors. Odors that occur in equipment exhaust would be minimized by mandatory use of ultra-low sulfur diesel fuel. Emissions of this nature would occur briefly during construction and would cease at the end of construction. There would be no notable impact of objectionable odors affecting a substantial number of people. Operation activities would be limited to inspection, patrol, and maintenance as needed, and would not produce odors that would adversely affect a substantial number of people. This impact would be less than significant, and no mitigation is required.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-1 ADMINISTRATIVE DRAFT MND/IS
5.4. Biological Resources
BIOLOGICAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special -status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
☐ ☒ ☐ ☐
(b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
☐ ☐ ☐ ☒
(c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological inter - ruption, or other means?
☐ ☐ ☐ ☒
(d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
☐ ☐ ☐ ☒
(e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? ☐ ☒ ☐ ☐
(f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.4.1. Setting
This section describes the biological resources that occur in the proposed Project area. It includes a description of the existing biotic environment, including common plants and wildlife, sensitive habitats, special-status species and their locations in relation to the proposed Project. The following section (5.4.2) presents an analysis of potential impacts to biological resources and, where necessary, specifies mitigation measures to reduce potential impacts to less-than-significant levels.
For purposes of this analysis, the following designations apply:
Proposed Project Area: The proposed Project area is defined as all areas subject to permanent and temporary impacts.
Study Area: The Study Area is defined as the proposed Project area plus a 500-foot buffer.
Existing Habitat
The proposed Project is located within a fully developed urban area between the San Jose International Airport and Levi Stadium in the City of Santa Clara dominated by urban hardscape and land cover.
Northern Receiving Station (NRS) is the northern terminus of the proposed Project, and the Kifer Receiving Station (KRS) is the southern terminus. An industrial land use property located at 1715 Martin Avenue in Santa Clara has been identified as a potential staging yard for the proposed Project. Access to the proposed Project work areas will be from existing adjacent paved roads.
Urban/developed areas occur throughout the proposed Project area and adjacent lands, and include paved roads, bare ground associated with disturbance or development, buildings, paved parking lots, road medians and roadsides, railroad tracks and right-of-way, and landscaped areas. Land uses within the Study NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-2 ADMINISTRATIVE DRAFT MND/IS
Area include residential, parks/open space, commercial, and industrial. Areas not containing hardscape are limited to residential, commercial, and roadside landscaped areas, landscaped parks/open space, and managed (e.g., mowing) ruderal areas of road shoulders and utility rights -of-way. Figure 5.4 -1 shows a few ruderal, park/open space, and landscaped interchange areas meaningful to this analysis as they provide marginal habitat for certain special -status species. The Study Area does not contain natural vegetation community alliances as described in A Manual of California Vegetation (Sawyer et al., 2009).
The topography of the Study Area is relatively flat and open, increasing in elevation roughly north to south from approximately 10 to 50 feet above mean sea level.
A biological resources reconnaissance survey was not conducted for the proposed Project. Information used in preparing this section was derived from:
U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) federal resource list for the proposed Project area (USFWS, 2024a); California Department of Fish and Wildlife (CDFW) Biogeographic Information and Observation System (BIOS) Viewer (Map) California Natural Diversity Database (CNDDB) summary table report within a 5-mile buffer of the proposed Project area (CDFW, 2024); California Native Plant Society (CNPS) Rare Plant Inventory (RPI) species list within the two U.S.
Geological Survey (USGS) 7.5 -minute quadrangles overlapping the proposed Project area, including Milpitas and San Jose West (CNPS, 2024);
Jepson eFlora (Jepson eFlora, 2024) online version of The Jepson Manual: Higher Plants of California (Baldwin et al., 2012) with access to Consortium of California Herbaria (CCH) record locations and details for RPI-identified species;
California Academy of Sciences and National Geographic Society – iNaturalist (iNaturalist, 2024) sensitive species observations within a 5-mile buffer of the proposed Project area; The Cornell Lab of Ornithology eBird (eBird, 2024) sensitive species observations within a 5-mile buffer of the proposed Project area;
U.S. Department of Agriculture Natural Resources Conservation Service (USDA NRCS) Web Soil Survey (USDA NRCS, 2024a) and National Hydric Soil List (USDA NRCS, 2024b) for data on soil units mapped within and adjacent to the proposed Project area; and
USFWS National Wetlands Inventory (NWI) Wetlands Mapper (USFWS, 2024b) for wetlands and waters mapped within and adjacent to the proposed Project area.
Special-Status Plants and Animals
Special-status species are plant and wildlife species that have been afforded special protection by federal, state, or local resource agencies or organizations. The literature review identified 15 special -status plant species and 48 special-status wildlife species within 5 miles of the proposed Project area (see Appendix E of this IS/MND). Based on this literature review and desktop analysis of the Study Area, there is low to moderate potential for 11 special-status wildlife to occur within or adjacent to the proposed Project area due to the presence of marginal to suitable habitat. Due to the developed and disturbed nature of the Study Area, no special -status plant species have potential to occur within or adjacent to the proposed Project area. Due to a lack of marginal or suitable habitat, no special-status fish or amphibian species have potential to occur within or adjacent to the proposed Project area.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-3 ADMINISTRATIVE DRAFT MND/IS
Figure 5.4-1. Vegetation and Land Cover
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-4 ADMINISTRATIVE DRAFT MND/IS
Jurisdictional Waters
There are no potentially jurisdictional waters or wetlands within the proposed Project area based upon a review of the USFWS NWI Wetlands Mapper (USFWS, 2024b), USGS Milpitas and San Jose West 7.5-minute quadrangle map, and Google Earth aerial and street view imagery. A formal aquatic resources delineation was not completed for the proposed Project.
Regulatory Background
Federal
Endangered Species Act (16 U.S.C. § 1531 et seq., and 50 C.F.R., part 17.1 et seq.). The federal Endan - gered Species Act (FESA) designates and provides for protection of threatened and endangered plant and wildlife species and their critical habitat. “Take” of a federally listed species is prohibited without the appropriate permits, which may be obtained th rough Section 7 consultation (between federal agencies) or a Section 10 Habitat Conservation Plan.
The Bald and Golden Eagle Protection Act (16 U.S.C. § 668-668c). This Act—enforced through regulations written by the USFWS— prohibits the “taking” of bald and golden eagles, including their parts, nests, or eggs. To take is defined as to “pursue, shoot, shoot at, poison, wound, kill, capture, trap, collect, destroy, molest, or disturb” any bald or golden eagle, whether “alive or dead...unless authorized by permit”. The administering agency is USFWS.
Migratory Bird Treaty Act (16 U.S.C §§ 703-711). The Migratory Bird Treaty Act (MBTA) makes it illegal to take, possess, import, export, transport, sell, purchase, barter, or offer for sale, any migratory bird, or the parts, nests, or eggs of such a bird except under the terms of a valid federal permit. The USFWS has authority and responsibility for enforcing the MBTA. The administering agency is USFWS.
Clean Water Act Sections 401 and 404 (33 U.S.C., §§ 1251—1376). The Clean Water Act (CWA) regulates the chemical, physical, and biological integrity of the nation’s waters. Section 401 of the CWA requires that an applicant obtain State certification for discharge into waters of the United States. The Regional Water Quality Control Boards admini ster the certification program in California. Section 404 of the CWA established a permit program, administered by the U.S. Army Corps of Engineers, to regulate the discharge of dredged or fill material into waters of the United States, including wetlands.
State
California Endangered Species Act (Fish and Game Code [CFGC] §§ 2050 -2098). The California Endan - gered Species Act (CESA) of 1984 states that all native species of fish, amphibians, reptiles, birds, mammals, invertebrates, and plants, and their habitats, threatened with extinction and those experi - encing a significant decline which, if not halted, would lead to a threatened or endangered des ignation, will be protected and preserved. CESA prohibits the take of any species of wildlife designated by the California Fish and Game Commission as endangered, threatened, or candidate species. The CDFW may authorize the take of any such species if certain conditions are met. These criteria are listed in Title 14 of the California Code of Regulations, Section 783.4 subdivisions (a) and (b). For purposes of CESA “take” means to hunt, pursue, catch, capture, or kill (CFGC § 86). The administering agency is CDFW.
Fully Protected Species (CFGC §§ 3511, 4700, 5050, 5515, and 2081.15). These sections designate certain species as fully protected and prohibit the take of such species or their habitat unless for scientific pur - poses (see also Cal. Code Regs., tit. 14, §670.7). The incidental take of fully protected species may also be authorized in an approved natural community conservation plan (CFGC § 2835). California Senate Bill 147 (signed by Governor Newsom July 2023) amends 3511, 4700, 5050, and 5515 and Section 395, and adds Section 2081.15 to the Fish and Game Code. Fish and Game Commission is required to establish a list of endangered species and a list of threatened species and to add or remove species if the action is NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-5 ADMINISTRATIVE DRAFT MND/IS
warranted. “The act prohibits the taking of endangered or threatened species, except in certain situations, including, if specific conditions are met, through the issuance of a permit commonly known as an inci - dental take permit.” CDFW is authorized to issue a permit under CESA that would authorize the take of fully protected species resulting from impact attributable to the implementation of specified projects if certain conditions are met. This remains in effect until December 31, 2033. The administering agency is CDFW.
CFGC Protection for Birds . CFGC Section 3503 states that it is unlawful to take, possess, or needlessly destroy the nest or eggs of any bird, except as otherwise provided by this code or any regulation made pursuant thereto. Section 3503.5 makes it unlawful to take, possess, or destroy any birds of prey or to take, possess, or destroy the nest or eggs of any such bird. Section 3513 makes it unlawful to take or possess any migratory non-game birds designated under the MBTA, except as provided by rules and regu- lations adopted under the MBTA. Section 3800 defines all birds occurring naturally in California that are not resident game birds, migratory game birds, or fully protected birds are nongame birds. It is unlawful to take any nongame bird except as provided in this code or in accordance with regulations of the commission.
California Species of Special Concern. “Species of Special Concern” is a designation assigned by the CDFW to species it considers at risk. Species of Special Concern meet one or more of the following criteria: (1) is extirpated from the State or, in the case of birds, in its primary seasonal o r breeding role; (2) is federally, but not State, listed as threatened or endangered; meets the State definition of threatened or endangered but has not formally been listed; (3) is experiencing, or formerly experience d, serious (noncyclical) popu- lation declines or range retractions (not reversed) that, if continued or resumed, could qualify it for State threatened or endangered status; (4) has naturally small populations exhibiting high susceptibility to risk from any factor(s), that if realized, could lead to declines that would qualify it for State threatened or endangered status. “Species of Special Concern” is an administrative designation intended to focus atten- tion on at-risk species during environmental review and conservation planning. Species of Special Concern should be considered during the environmental review process. CEQA (California Public Resources Code §§ 21000 21177) requires state agencies, local governments, and special districts to evaluate and disclose impacts from “projects” in the state. Because Section 15380 of the CEQA Guidelines defines endangered, rare or threatened species to include species which meet criteria consistent with the criteria required for listing under the federal and/or state endangered species acts regardless of whether such species are formally listed, Species of Special Concern are appropriately considered in the analysis of Project impacts.
Furbearing and Mammal Protection. Additional regulations are in place protecting furbearing mammals as follows:
Fish and Game Code §251.1 prohibits the harassment of any furbearing mammal. Harass is defined as an intentional act that disrupts an animal’s normal behavior patterns, which includes, but is not limited to, breeding, feeding, or sheltering.
California Code of Regulations Title 14 §460 states that fisher, marten, river otter, desert kit fox and red fox may not be taken at any time.
CEQA Guidelines §15380. Enacted in 1970, CEQA requires an applicant to fully disclose environmental impacts before issuance of a permit by state and local agencies. State CEQA Guidelines Section 15380(b) articulates the classifications of species to be analyzed under CEQA. In gen eral, impacts to plants or their habitat having a California Rare Plant Rank of 1A (plants presumed extirpated in California and either rare or extinct elsewhere), 1B (plants rare, threatened, or endangered in California and elsewhere), 2A (plants presumed extirpated in California, but common elsewhere), 2B (plants rare, threatened, or endangered in California), or 3 (plants about which more information is needed — a review list) must be analyzed during preparation of the environmental documents relating to CEQA. According to the California Native NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-6 ADMINISTRATIVE DRAFT MND/IS
Plant Society’s (CNPS) Rare Plant Program, species with these California Rare Plant Rank rankings meet the definition of “rare and endangered” under the CEQA Guidelines.
Native Plant Protection (CFGC § 1900 et seq.). The Native Plant Protection Act was enacted in 1977 and designates state rare and endangered plants and provides specific protection measures for identified populations. Those laws prohibit the take of endangered or rare native plants but include some exceptions for agricultural and nursery operations; for emergencies; after properly notifying CDFW, for vegetation removal from canals, roads, and other sites; due to changes in land use; and in certain other situ ations.
The administering agency is CDFW.
Porter-Cologne Water Quality Control Act (California Water Code Division 7). The State Water Resources Control Board (SWRCB) and the nine Regional Water Quality Control Boards (RWQCBs) have jurisdiction over all surface water and groundwater in California, including wetlands, headwaters, and riparian areas.
The SWRCB or applicable RWQCB must issue waste discharge requirements for any activity that discharges waste that could affect the quality of waters of the state.
Local
City of Santa Clara General Plan. The City’s General Plan was adopted on November 16, 2010, and updated on December 9, 2014. Goals and policies specific to the City’s General Plan to protect and preserve the city’s natural habitat and wildlife are described in Chapter 5 Goals and Policies, Section 10 Environmental Quality. Those goals and policies that are important with respect to the project area as follows:
Conservation Goals
Conservation Goal 5.10.1 G1: The protection of fish, wildlife and their habitats, including rare and endangered species.
Conservation Goal 5.10.1 G2: Conservation and restoration of riparian vegetation and habitat.
Conservation Policies
Conservation Policy 5.3.1 P10: Provide opportunities for increased landscaping and trees in the community, including requirements for new development to provide street trees and a minimum 2:1 on- or off-site replacement for trees to be removed as part of t he proposal to help increase the urban forest and minimize the heat island effect.
Conservation Policy 5.10.1 P1: Require environmental review prior to approval of any development with the potential to degrade the habitat of any threatened or endangered species. Conservation Policy 5.10.1 P2: Work with Santa Clara Valley Water District and require that new development follow the “Guidelines and Standards for Lands Near Streams” to protect streams and riparian habitats.
Conservation Policy 5.10.1 P3: Require preservation of all City-designated heritage trees listed in the Heritage Tree Appendix 8.10 of the General Plan (see Appendix C of the Arborist Report). Conservation Policy 5.10.1 P4: Protect all healthy cedars, redwoods, oaks, olives, bay laurel and pepper trees of any size, and all other trees over 36 inches in circumference measured from 48 inches above - grade on private and public property as well as in the public right-of-way. Conservation Policy 5.10.1 P5: Encourage enhancement of land adjacent to creeks in order to foster the reinstatement of natural riparian corridors where possible. Conservation Policy 5.10.1 P12: Encourage property owners and landscapers to use native plants and wildlife-compatible non-native plants, when feasible.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-7 ADMINISTRATIVE DRAFT MND/IS
Santa Clara City Codes and Ordinances. Santa Clara City Code (City Code) sections 12.35 regulates trees on City land (i.e., public rights-of-way or easements, streets, and parks) and private land. A City permit is required for removing the following protected trees (§12.35.080):
Heritage trees in all zoning districts.
All trees of the following species on private property with a diameter of 12-inches or more when mea- sured at 54-inches above natural grade: California buckeye ( Aesculus californica), big leaf maple ( Acer macrophyllum), deodar cedar ( Cedrus deodara), camphor tree ( Cinnamomum camphora), western sycamore (Platanus racemosa), coast live oak ( Quercus agrifolia), valley oak ( Q. lobata), black oak ( Q. kelloggii), blue oak ( Q. douglasii), interior live oak ( Q. wislizeni), other native oak trees ( Quercus sp.), coast redwood (Sequoia semperivirens), and California bay (Umbellularia californica). Approved development trees.
Any tree on private land with a trunk diameter of 38-inches or more when measured at 54-inches above natural grade.
Any multibranched tree on private land which has major branches below 54-inches above natural grade with a diameter of 38-inches or more measured below the first major trunk fork.
The Department of Community Development considers many factors in reviewing a tree removal permit application, including, but not limited to, if the tree can cause potential damage to an existing or proposed essential structure, or interfere with utility s ervices and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility service ( §12.35.090[c][4][A]). The City does not require the replacement of trees unless the project involves obtaining a discretionary permit (§12.35.100).
City trees and protected trees shall be protected by use of best management practices, design conditions, and measures listed in City Code, section 12.35.100 (d -f). When possible, work shall be conducted in accordance with American National Standards Institute ( ANSI) A300 standards, developed as voluntary industry consensus standards by the Tree Care Industry Association, and follow tree care best manage - ment practices published by International Society of Arboriculture (ISA) necessary to protect the vitali ty of the tree.
Santa Clara Valley Habitat Plan . Adopted in 2013, the Santa Clara Valley Habitat Plan (Plan) is a 50 -year regional plan designed for the protection and recovery of sensitive biological resources within a large portion of Santa Clara County while allowing for future development (ICF International 2012). The Plan area includes two geographic regions, the North Valley and South Valley. The northern boundary of the Plan area extends to the Alameda and Santa Clara Counties boundary, excluding the Milpitas City L imits and lands owned by the San Francisco Public Utilities Commission. The northwestern boundary is the Guadalupe River and boundary between the cities of Santa Clara and San Jose. Plan covered activities categories include urban development, in-stream capital projects, in-stream operations and maintenance, rural capital projects, rural operations and maintenance, rural development, and conservation strategy implementation. Construction, maintenance, and use of public and private utilities including electr ic transmission and distribution lines are Plan covered activities within the urban development category.
The Plan also Includes an expanded study area for identified for burrowing owl conservation and is located in the northern edge of the county in porti ons of the cities of San Jose, Santa Clara, Mountain View, Milpitas, and Sunnyvale (ICF International 2012). The Project site is located within the expanded study area for burrowing owl conservation and approximately 2 miles outside the Plan area boundary.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-8 ADMINISTRATIVE DRAFT MND/IS
5.4.2. Environmental Impacts and Mitigation Measures
(a) Would the project have a substantial adverse effect, either directly or through habitat mod ifica- tions, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The proposed Project area lacks natural vegetation communities. Direct and indirect impacts from the proposed Project will be restricted to areas containing urban/developed and ruderal land cover types. The proposed Project area is in a highly developed, built out urban area and contains no habitat for special -status plant species and limited habitat suitable for most special -status wildlife species unless they are adapted to urban environments. If present, most special-status wildlife species would likely occur during migratory movements or periodic foraging events and would not be expected as resident species in the proposed Project area. However, if present within or adjacent to the proposed Project area, the proposed Project could result in direct or indirect impacts to special-status wildlife species. These impacts would be avoided or minimized with the implementation of Mitigation Measures (MMs) BIO-1 through BIO-6 proposed below.
Special-Status Plants
The construction and operation/maintenance of the proposed Project would not affect state or federally listed threatened or endangered plants, state rare plants, or any California Rare Plant Ranked special- status plants. No special status plants were identified during the literature review and desktop analysis has having a potential to occur due to the developed and disturbed nature of the Study Area. No impacts to special-status plant species are expected.
Special-Status Wildlife
Based on a literature review and desktop analysis of the Study Area, t here is low to moderate potential for 17 special-status wildlife to occur within or adjacent to the proposed Project area due to the presence of marginal to suitable habitat.
Construction Impacts on Special-Status Wildlife
Invertebrates
The following special-status invertebrate species were considered for this analysis:
Monarch butterfly (Danaus plexippus plexippus) – Federal listing candidate, State Rank (SR) S2 Obscure bumble bee (Bombus caliginosus) – CDFW Special Animal, SR S1S2 Crotch’s bumble bee (Bombus crotchii) – CESA candidate for Endangered listing, SR S2 Western bumble bee (Bombus occidentalis) – CESA candidate for Endangered listing, SR S1 Monarch butterfly overwinters in wind-protected tree groves, primarily preferring gum trees (Eucalyptus spp.) but also using native trees such as Monterey pine ( Pinus radiata), Monterey cypress ( Cupressus macrocarpa), western sycamore (Platanus racemos a), coast redwood (Sequoia sempervirens ), and coast live oak (Quercus agrifolia). Monarchs return to the same overwintering sites annually, are typically along the Pacific Coast and San Francisco Bay. Migrating adults will forage on a variety of plants, whereas larvae primarily feed on milkweed (Asclepias sp.) species (Jepsen et al. 2015). A variety of roosting trees can be used during fall migration (USFWS 2020).
The proposed project area does not support suitable foraging or egg-laying habitat for monarch butterfly and the proposed Project area is outside of the known overwintering range for the species. Monarch butterfly could occur as a migrant that moves through the area to preferable overwintering sites along the coast. Monarch butterfly is known to occur in the region from numerous iNaturalist observations NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-9 ADMINISTRATIVE DRAFT MND/IS
(iNaturalist, 2024); there are no CNDDB records within 5 miles of the proposed Project area. This species could occur in the region as a migrant during construction. The proposed Project area lacks natural vege- tation communities that could support milkweed species. Urban yards adjacent to the Project area could support periodic milkweed or other foraging plants. However, based on the limited habitat and incidental use of milkweed or foraging plants, impacts to this species would be considered less than signi ficant and no mitigation is required. Nonetheless, should this species occur in the Project area as a transient, con - struction related impacts would be reduced by mitigation requirements for other wildlife species which include MM BIO-1 through MM BIO -3 requiring worker environmental awareness training, periodic biological monitoring if needed, and a general preconstruction survey. Although not required for this species, these measures would avoid or reduce impacts to this species should it occur in the Project area during construction.
The current ranges, distribution, and abundance of obscure bumble bee, Crotch’s bumble bee, and western bumble bee are poorly understood (CDFW 2019; Xerxes Society 2018). The proposed Project area is located within the species range for both obscure bumble bee and Crotch’s bumble bee, and within the historic range for western bumble bee (CWHR 2023; Hatfield et al. 2015). There is one historic CNDDB record within 5 miles of the proposed Project for each of these bumble bee species (CDFW, 2024): one 1954 record for obscure bumble bee, one 1903 record for Crotch’s bumble bee, and one 1979 record for western bumble bee, all presumed extant, are mapped generally to San Jose and overlapping the southern half of the Study Area. There are several potential sightings of obscure bumble bee from the California Bumble Bee Atlas community science project, identified to be either obscure bumble bee or a second species similar in appearance (Bumble Bee Watch, 2024). These potential obscure bumble bee sightings are of foragi ng individuals and primarily located at or near urban parks or urban residences or other buildings with ornamental landscaping, with the nearest being along the Guadalupe River Trail approxi - mately 0.9 miles east northeast of the Project area (proposed structure 18). Crotch’s bumble bee is further known in the region from three verified community science observations of foraging individuals within 5 miles, the nearest located foraging in an ornamental landscaped area in urban San Jose approximately
3.6 miles southeast of the Project area (Bumble Bee Watch, 2024; iNaturalist, 2024). There are no community science observations for western bumble bee within 5 miles (Bumble Bee Watch, 2024; CDFW, 2024; iNaturalist, 2024).
The proposed Project area lacks natural vegetation communities that would contain abundant floral resources. Urban yards adjacent to the Project area could support periodic floral resources that could potentially support special -status bumble bees. Although further research is needed, the likely foraging range for special-status bumble bee species is approximately 0.6 to 1.2 miles (1 to 2 kilometers) from the nest on a single trip (CDFW, 2023). Limited marginal habitat that could potentially support nesting special- status bumble bee species is located within or adjacent to the proposed Project area in the utility right - of-way adjacent to the NRS at the north end of the Project area and by Montague Expressway, in the landscaped area inside of the westbound onramp and on the fill slope supporting the Montague Expressway overcrossing on the west side of Lafayette Street. The marginal habitat at these locations consists of ruderal land cover containing primarily grasses and other herbaceous vegetation. Current and historic Google Earth aerial and street view imagery suggests these ruderal areas are periodically managed for weeds and fire abatement through mowing and/or discing. Google Earth aerial imagery also suggests the utility right-of-way and the landscaped interchange have been further disturbed by periodical use as staging areas for equipment and materials for other unrelated construction projects as recently as February 2024 and June 2022, respectively. Based upon the limited floral resources present and th e limited marginal nesting habitat present in highly disturbed ruderal locations, there is a very low/minimal potential for a special-status bumble bee species nest(s) to be present. Nonetheless, should special status bumble bee species occur in the Projec t area, construction related impacts would be reduced by mitigation requirements for other wildlife species which include MM BIO-1 through MM BIO -3 requiring NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-10 ADMINISTRATIVE DRAFT MND/IS
worker environmental awareness training, periodic biological monitoring if needed, and a general precon- struction survey.
Fish and Amphibians
The proposed Project will not affect any federally or state listed fish or amphibian species. Due to a lack of marginal or suitable habitat, no special -status fish or amphibian species are expected to occur within or adjacent to the proposed Project area.
Reptiles
The proposed Project will not affect any federally or state listed fish or amphibian species. Due to a lack of marginal or suitable habitat, most special-status reptiles are not likely to occur. One special-status reptile species that is a candidate for federal listing was considered for this analysis:
Western pond turtle (Actinemys marmorata) – Federal ESA candidate for Threatened listing, CDFW SSC, SR S3
The proposed Project area does not support suitable aquatic habitat that could support western pond turtle. Western pond turtle is known to occur in the region from 13 CNDDB records and numerous iNaturalist observations within 5 miles, including along the salt evaporation ponds along the bay approximately 2.25 miles northwest and the Guadalupe River approximately 0.75 miles east of the Project area (CNDDB, 2024; iNaturalist, 2024). There are many migratory movement barriers (i.e., roads, buildings, other hardscape,) present that would prevent western pond turtle from traveling into the Project area from the bay edge and the Guadalupe River. Western pond turtle is also known to occur in San Tomas Aquino Creek from two CNDDB records, a 1989 occurrence approxim ately 0.75 miles northwest of the NRS and a 2017 occurrence approximately 0.65 miles southwest of the KRS (CNDDB, 2024). The closest suitable aquatic habitat is located at San Tomas Aquino Creek, approximately 0.3 miles southwest of the NRS. The ruderal utility right-of-way adjacent to the NRS and proposed structures 1, 2, and 3 at the north end of the Project area provides limited marginal upland habitat for western pond turtle. The typical upland migration and/or dispersal distance for western pond turtle is up to approxi mately 0.3 miles (USFWS, 2023). The marginal habitat at this location consists of ruderal land cover containing primarily grasses and other herbaceous vegetation. Current and historic Google Earth aerial and street view imagery suggests this ruderal area is periodically managed for weeds and fire abatement through mowing and/or discing. Google Earth aerial imagery also suggests th is utility right-of-way has been further disturbed by periodical use as a staging area for equipment and materials for other unrelated construction projects as recently as February 2024.
Further, based on Google Earth aerial and street view imagery, two chain-link fences exist between San Tomas Aquino Creek and the project work areas located on the west side of Lafayette Street, one on either end of the ruderal utility right-of -way. These chain -link fences likely present a barrier to upland movements unless holes under the fences, or other breaks in the fence line, exist or develop in the future.
In the event that western pond turtle is present within or adjacent to the proposed Project area, destruc- tion or abandonment of nest sites or occupied burrows or mortality from crushing by vehicles or equipment would be considered significant. Implementation of MM BIO-1 through MM BIO- 3 requiring worker environmental awareness training, periodic biological mo nitoring if needed, and a general preconstruction survey, would reduce impacts to western pond turtle to less than significant.
Birds
Native birds are regulated by the MBTA and CFGC Section 3503. These regulations also protect federally or state listed birds, fully protected birds, bird species of special concern, watch list bird species, and birds of conservation concern. Though watch list species and birds of conservation concern do not typically warrant protections under CESA, they would be protected under the MBTA and CFGC. A variety of common birds may nest within or adjacent to the proposed Project area, including California scrub j ay, NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-11 ADMINISTRATIVE DRAFT MND/IS
mourning dove, Cooper’s hawk, and great egret. Nests may be built in trees or other vegetation, on the ground, or on existing buildings or other structures. Birds may also attempt to nest in construction materials or on idle construction equipment. Due to the urban/developed land cover and the regular disturbance experienced from urban anthropogenic activities, mowing, and vehicle and equipment staging within or adjacent to the proposed Project area, it is more likely that special-status avian species adapted to developed or semi-developed environments would nest in or near the proposed Project area.
Even in the urban/developed land cover, the loss of native and migratory bird species would be considered a significant impact.
In addition to common bird species, t he following special-status bird species were considered for this analysis:
Burrowing owl (Athene cunicularia) – CDFW SSC, USFWS Bird of Conservation Concern (BCC), SR S2 Swainson’s hawk (Buteo swainsoni) – ST, SR S4
White-tailed kite (Elanus leucurus) – CDFW Fully Protected (FP), SR S3S4 American peregrine falcon (Falco peregrinus anatum) – Federally and State de-listed, S3S4 Two of the special-status species listed would not be expected to nest within or near the proposed Project area due to a lack of suitable habitat and the current level of ongoing disturbance. Although marginal nesting habitat is present, the proposed Project area is outside of the current breeding range within California for Swainson’s hawk (CDFW, 2016). The proposed Project area and surrounding land lack suitable cliff ledges, tall buildings, or similar features that would provide suitable nesting habitat for American peregrine falcon. However, these special-status bird species have a low to moderate potential to forage within or adjacent to the proposed Project area. The Project will not convert any land cover that could be used as foraging habitat. Construction related impacts to foraging protected birds would be short-term and temporary in nature.
Burrowing owl is an urban -adapted raptor species which occurs in open, dry annual or perennial grass- lands, deserts, and scrublands characterized by low growing vegetation (CWHR, 2021). This species requires subterranean nesting and roosting features such as California ground squirrel (Otospermophilus beecheyi) burrows or analogous features (CWHR, 2021). Burrowing owl is known in the region from 32 CNDDB records within 5 miles of the proposed Project, including some that are known or suspected to be extirpated. A 2014 CNDDB occurrence record overlaps the NRS, adjacent land, and the Levi Stadium facility (CDFW, 2024); the entire area of this occurrence polygon has been developed or has been heavily disturbed in the case of the ruderal utility right -of-way. Extant populations are documented in 2004 and 2009 CNDDB occurrence records, respectively, at the Santa Clara Golf and Tennis Club located approxi - mately 0.5 miles north of the NRS and at the San Jose International Airport located approximately 0.5 miles east of the KRS (CDFW, 2024). There are also numerous community science observations of burrow- ing owl within 5 miles, including during the March through August breeding season (eBird, 2024; CWHR, 2021; iNaturalist, 2024). Limited marginal habitat for burrowing owl is located within or adjacent to the proposed Project area at adjacent to the NRS, at the landscaped areas on Lafayette Street at Montague Expressway. The marginal habitat at these locations consists of ruderal land cover containing primarily grasses and other herbaceous vegetation. Current and historic Google Earth aerial and street view imagery suggests these ruderal areas are periodically managed for weeds and fire abatement through mowing and/or discing. Google Earth aerial imagery also suggests the utility right -of-way and the landscaped interchange area has periodically been used to stage equipment and materials for other unrelated construction projects as recently as February 2024 and June 2022, respectively . Due to the presence of limited marginal nesting and foraging habitat, the documented occurrences in proximity to the Project area, and the species’ adaptation to urban environments, the potential for burrowing owl to occur within or adjacent to the proposed Project area is moderate; therefo re, direct impacts to burrowing owl could occur.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-12 ADMINISTRATIVE DRAFT MND/IS
White-tailed kite is a raptor species which occurs in open grasslands, meadows, marshes, and agricultural areas close to isolated, dense-topped trees used for nesting and perching (CWHR, 2021). White-tailed kite is known in the region from one recent 2004 and one 1971 CNDDB record located in or adjacent to open grassland habitats by the bay approximately 1.3 to 1.6 miles north northeast of the NRS (CDFW, 2024).
There are also numerous community science observations within 5 miles, including a 2022 eBird obs er- vation located at the Oracle Santa Clara Campus adjacent to the Palm Substation and between the substation and Montague Expressway (eBird, 2024; iNaturalist, 2024). Limited suitable nesting trees are present within or near the proposed Project area, particularly along San Tomas Aquino Creek to the west of the NRS, Lick Mill Park to the east of NRS, the Oracle Santa Clara Campus between the Palm Substation and Montague Expressway. Limited marginal foraging habitat is present adjacent to the NRS , the land- scaped interchange, and ruderal road shoulders along the west side of the Montague Expressway overpass. The marginal foraging habitat consists of ruderal land cover containing primarily grasses and other herbaceous vegetation. Current and historic Google Earth aerial and street view imagery suggests these ruderal areas are periodically managed for weeds and fire abatement throug h mowing and/or discing. Google Earth aerial imagery also suggests the utility right-of-way and the landscaped interchange at Monta gue Expressway have periodically been used to stage equipment and materials for other unrelated construction projects as recently as February 2024 and June 2022, respectively. Due to the high level of disturbance experienced in the limited marginal nesting and foraging habitat, the potential for white-tailed kite to occur within or adjacent to the proposed Project area is low.
With the exception of a few non -native birds, such as European starling ( Sturnus vulgaris ) and house sparrow (Passer domesticus), the loss of active bird nests or young is regulated by the MBTA and CFGC Section 3503. Direct or indirect impacts to nesting birds or raptors, if present, would be considered significant. Implementation of the proposed Project could disturb birds if they nest in or near the proposed Project area. Direct impacts could include loss of nests from contact with construction equipment. If present on the ground within the proposed Project area, nests or eggs could be subject to destruction from crushing by construction vehicles, equipment, or personnel. As described in Section 4 Project Description and in the arborist report prepared for the Project (Appendix D), trees may require either full removal or clearance pruning to construct the Project. The maximum allowable tree height under the transmission lines will vary from 27 to 35 feet depending upon location.
To reduce impacts to nesting bird species, the Project will implement MM BIO-1 through BIO-4, which requires worker training, periodic biological monitoring if needed, a general preconstruction survey for special-status species, and a focused survey for nesting birds and raptors (if construction activities are scheduled during the breeding season). Implementation of these measures would reduce impacts to nesting bird and raptor species to less than significant.
Mammals
The Project site does not provide habitat for federally or state listed mammal species or fur-bearing mam- mals. The Project site could provide potential habitat for a variety of special status bat species. Bats utilize a variety of daytime rooting sites, including caves, rock crevices, mines, trees and snags, bridges, and buildings and structures. While some bats are colonial, living in large colonies in caves or under bridges, others are solitary, roosting in trees and crevices. Sensitive periods for bats include the hibernation sea - son, when bats are sustaining on fat reserves, and the maternity season, when female bats give bir th to babies. The decline of bat populations is often due to roost site disturbance or loss. Due to their sensitivity to noise, human presence, and other disturbance factors, impacts to bat roosts would be considered a significant impact.
The following special-status bat species were considered for this analysis:
Townsend’s big-eared bat (Corynorhinus townsendii) – CDFW SSC, SR S2 Western red bat (Lasiurus frantzii) – CDFW SSC, SR S3 NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-13 ADMINISTRATIVE DRAFT MND/IS
Townsend’s big-eared bat is a flying mammal species which primarily roosts on the walls and ceilings of caves and mines but also within buildings, bridges, rock crevices, and hollow trees (CWHR, 2024; WBWG, 2017). A specific roost may be used during one season or may be used throughout the year for maternity, hibernation, or breeding (CDFW, 2013). Summer maternity colonies are formed between March and June and can be made of a few individuals to several hundred (CDFW, 2013). This bat species is extremely sensitive to human disturbance (CWHR, 2024; WBWG, 2017). The Montague Expressway overpass bridge structure over Lafayette Steet provides limited marginal suitable roosting habitat to support this species.
The proposed Project will not impact the overpass bridge structure. The Study Area provides limited suitable foraging habitat to support this species.
Western red bat is a flying mammal species that roosts throughout the year amongst the foliage of trees or shrubs, particularly in edge habitats adjacent to streams or open habitats such as grasslands and agri - cultural lands (CWHR, 2024; WBWG, 2017). This bat species is highly migratory and typically solitary but may roost in clusters of up to several individuals. Maternity season occurs between May and July (CWHR, 2024; WBWG, 2017). The proposed Project area and adjacent lands contain limited suitable fora ging habitat and limited trees and shrubs suitable to support roosting for this species, particularly along San Tomas Creek to the west of the NRS, Lick Mill Park east of NRS, and the Oracle Santa Clara Campus between the Palm Substation and the Montague Expressway interchange.
Due to the existing level of disturbance in proximity to the limited marginal roosting and foraging habitat, special status bat species are not expected to occur or are expected to be more tolerant of disturbance due to the baseline level of human activity from vehicle traffic and human presence, as in the case of the Montague Expressway Overpass bridge. If present within vegetation requiring removal or trimming, direct impacts could include mortality from contact with construction equipment or abandonment of roosts and, if during the maternity season, of pups incapable of flight. To reduce impacts, the Project will implement MM BIO-1, BIO-2, and BIO-5, which will require worker training, periodic biological monitoring if needed, a preconstruction survey for bat roosts, and development and implementation of a Bat Mitigation and Monitoring Plan if roosts are detected. Implementation of these measures would avoid impacts to special- status bat species maternity roosts and reduce impacts to less than significant.
Direct impacts to special-status wildlife resulting from construction of the proposed Project could also occur from exposure to noise or vibration, fugitive dust, or exposure to hazardous materials. As described in Section 5.3 (Air Quality), Silicon Valley Power would implement measures to control and suppress fugitive dust in compliance with all standards required by the Bay Area Air Quality Management District.
As described in Section 5.10 (Hydrology and Water Quality), hazardous materials control measures would be used throughout construction to reduce potential impacts. Construction activities would require the use of vehicles and heavy equipment capable of generating noise and ground vibration within and adja - cent to the proposed Project area. As discussed in Section 5.13 (Noise), impacts from construction-related ground vibration would be short-term and confined to the immediate work area (within approximately 25 feet). Incremental noise from construction vehicles and traffic noise would not represent a substantial increase in the context of the project surroundings and the existing noise levels , as discussed in Section
5.13 (Noise). As such, direct impacts from exposure to noise or vibration, fugitive dust, or exposure to hazardous materials would be reduced to less than significant.
Operational Impacts on Special-Status Wildlife
Once the proposed Project is constructed, SVP’s existing maintenance and operations group would assume inspection, patrol, and maintenance duties. Project operation and maintenance activities could generate varying levels of human presence, lighting, and noise along the Project alignment and adjacent areas. Direct impacts to special -status species, if present during operations, could include exposure to increased levels of human presence, exposure to noise and night lighting generated from maintenance NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-14 ADMINISTRATIVE DRAFT MND/IS
activities, hazardous material spills, and collision with overhead electrical transmission lines or electro - cution from overhead electrical equipment on utility poles.
Due to the urban/developed land cover and the regular disturbance experienced from urban anthropo - genic activities, mowing, and vehicle and equipment movement and staging within or adjacent to the proposed Project area, it is more likely that special-statu s wildlife species adapted to developed or semi- developed environments would occur as resident species within or adjacent to the proposed Project area.
The proposed Project primarily occurs along an existing overhead electrical distribution alignment subject to existing inspection, patrol, and maintenance activities conducted by Silicon Valley Power. As discussed in Section 5.13 (Noise), the occasional nature of maintenance noise due to implementation of the pro - posed Project would not result in noise levels in excess of standards established in the local general plan or noise ordinance. Permanent increases in ambient noise levels in the project vicinity would not occur, and the transmission and distribution system improvements would not generate a new or different source of permanent noise. Equipment associated with operation and maintenance of the proposed Project would not produce any groundborne noise or vibration; therefore, operation and maintenance of the project would result in no impact under this criterion. Other than substances associated with vehicles that would be used for inspections and maintenance, no hazardous materials are associated with maintenance and operation of the proposed Project. Therefore, impacts from an increased exposure to increased levels of human presence, exposure to noise and night lighting generated from maintenance activities, or hazardous material spills would be less than significant.
Power lines, communications towers, and other elevated structures are known to pose a threat to birds.
The risk of bird collisions with power lines is influenced by a number of factors, including the type and size of bird, weather, visibility, season, surr ounding habitat, and size, configuration, and placement of power lines (APLIC, 2012). Collisions with power lines are generally due to poor visibility of electrical lines, but collisions may also occur with other structures such as utility poles and substa tion structures. Collisions may occur in poor weather or visibility conditions, or when birds are startled and flushed from cover, fleeing from predators, or focused on pursuing prey.
Electrocution can occur when a bird perches, lands, or takes off from a utility pole if the animal makes contact with two conductors to complete the electrical circuit, or simultaneously contacts energized phase conductors and other equipment, or simultaneously contacts an energized wire and a grounded wire. Electrocution on power lines is a greater potential hazard to larger birds, such as raptors, because their body size and wingspan are large enough to span the distance between the conductor wires and thus complete the electrical circuit (APLIC, 2006).
To reduce potential collision and electrocution risks to birds and bats, the Project is being designed in compliance with current APLIC guidelines (APLIC, 2006) as described in Section 4 Project Description.
These methods ensure a minimum separation between elec trical components to prevent simultaneous contact and covering electrical components with protective materials to prevent contact. These incor - porated Project designs would reduce impacts to birds from electrocution and collision to a less than significant level.
Mitigation Measure for Special-Status Wildlife Species
MM BIO-1 Implement Worker Environmental Awareness Program. Prior to and for the duration of any vegetation removal and trimming and any ground disturbing activities, SVP or its designee shall provide Worker Environmental Awareness Program (WEAP) training to all new personnel prior to beginning work on the Project. The training may be presented in the form of a video. The training program shall be developed by a qualified biologist to educate Project personnel about the Project’s sensitive biological resourc es. The name and credentials of the qualified biologist shall be submitted to the City no less than 14 days prior to the surveys for review and approval. A draft of the training program (i.e., NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-15 ADMINISTRATIVE DRAFT MND/IS
video and written materials) shall be submitted to the City no less than 14 days prior for approval prior to implementation. The WEAP shall include, at a minimum:
An overview of the sensitive biological resources that are known or have the potential to occur in the Project area and surrounding habitat. This shall include nesting birds and special- plants and wildlife.
An overview of the Project and Mitigation Monitoring and Reporting Program (MMRP), and the consequences of non-compliance with these requirements. An overview of the federal and State Endangered Species Acts, Migratory Bird Treaty Act, Bald and Golden Eagle Protection Act, pertinent Fish and Game Code sections, and other applicable regulatory requirements and the consequences of non-compliance with these requirements.
Functions, responsibilities, and authority of the biological monitor (s) and how they interact with Project personnel.
Identify clear points of contact for the biological monitor(s) and construction personnel including who to contact should workers have questions regarding compliance with environmental documents and permit conditions.
Project restrictions, such as Environmentally Sensitive Habitat Areas (ESHAs), setbacks from sensitive biological resources, and avoidance buffers. Requirements to remain within authorized work areas and on approved access routes, with examples of flagging and signage used to designate these areas. Information on compliance with Project speed limits, control of litter and micro trash, smoking restrictions, wildfire minimization measures, spill containment and clean up, and the implementation of Best Management Practices.
Explanation that wildlife must not be harmed or harassed including procedures for abiding by Project speed limits, covering pipes, securing excavations, and installing exit ramps to prevent wildlife entrapment.
Training acknowledgement forms shall be signed by each person attesting that they understand and will abide by Project requirements. Upon request, SVP or its designee shall provide the City the WEAP training acknowledgement forms for persons who have completed the training in the prior month and a running total of all persons who have completed the training to date.
MM BIO-2 Biological Monitoring. SVP or its designee shall retain a qualified biologist as biological monitor on the Project, to be approved by the City. If sensitive biological resources are identified during preconstruction surveys or incidentally, the qualified biologist will monitor Project work locations in proximity to sensitive biological resources weekly until biological resources are not found for one consecutive month, at which point weekly monitoring will cease. The qualified biologist shall be no tified immediately if any nesting birds or other biological resources are discovered once construction begins. The qualified biologist will be the point of contact for any employee or contractor who might inadvertently kill or injure a special-status species or anyone who finds a dead, injured, or entrapped animal. The qualified biologist or biological monitor shall have the authority and responsibility to halt any Project activities that are not in compliance with applicable mitigation measures, permit conditions, or other Project requirements, or will have an unauthorized adverse effect on biological resources.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-16 ADMINISTRATIVE DRAFT MND/IS
MM BIO-3 Conduct Preconstruction Surveys for Special-Status Wildlife and Implement Avoidance Measures. A qualified biologist shall conduct a preconstruction survey for each of the species identified below. These surveys can be combined if they meet the requirements outlined in this measure. The name and credentials of the qualified biologist shall be submitted to the City no less than 14 days prior to the surveys for review and approval.
Within 14 days of completion of the surveys, the City shall be provided with a report describing the findings, including the date, time, and duration of the surveys; identity of the surveyor(s); a list of all common and special-status species observed; locations of any special-status species identified, including any established avoidance buffers; and any actions taken at the direction of the City in coordination with CDFW, and/or USFWS.
Bumble Bee: A preconstruction survey for Crotch’s bumble bee and western bumble bee shall be conducted during the colony active period for each species (April through August) prior to project vegetation management and ground disturbing activities. The survey shall be conducted by a qualified entomologist or biologist familiar with the life history and ecology of special-status bumble bee species. The preconstruction survey for special-sta- tus bumble bees shall focus on the ruderal habitat within the utility right-of-way adjacent to the Northern Receiving Station and landscaped and ruderal land at the Montague Expressway interchange. The survey shall identify any potential foraging, nesting, and/or overwintering resources present within the Project work areas and a 50-foot buffer where legal access is available. If a potential active special-status bumble bee nest site is identi- fied, a 50-foot avoidance buffer shall be clearly delineated with staking, flagging, and/or signage and Project activities will be prohibited from the area until it is determined that the nest is no longer potentially active. The qualified biologist shall notify the City for coordination with CDFW within 24 hours as further coordination may be required to avoid or mitigate impacts.
Burrowing Owl. No la
ter than seven days prior to start of project vegetation management and ground disturbing activities, a qualified biologist shall conduct a preconstruction survey for burrowing owl. The survey shall include the focus areas (described below) plus a 250-foot buffer where legal access is available. The survey for burrowing owl shall focus on the ruderal habitat described for bumble bees above. If burrows or other structures are identified that contain signs of use by burrowing owl, or if bu rrowing owl(s) is ob - served, an avoidance buffer area shall be clearly delineated with staking, flagging, and/or signage. If during the nesting season (February 1 to August 31), a 250 -foot avoidance buffer shall be established, and Project activities will be prohibited from the area until a qualified biologist determines it is occupied either by a non-mated pair or the young have fledged. If outside the nesting season, a 160 -foot avoidance buffer shall be established.
The prescribed buffers may be adjusted by the qualified avian biologist in coordination with the City and CDFW based on existing conditions around the burrow, planned construction activities, tolerance of the species at a given location, and other pertinent factors.
If avoidance of burrowing owls is not feasible and work will be conducted outside the nes
ting season, a Burrowing Owl Passive Relocation Plan shall be developed to provide detailed methods and guidance for passive relocation of burrowing owls. The Burrowin g Owl Passive Relocation Plan shall be submitted to the City for approval in coordination with CDFW prior to conducting passive relocation. An occupied burrow may not be dis - turbed during the nesting season, unless a qualified biologist determines, by non-invasive methods, that it is not occupied by a mated pair. Passive relocation would include installa- tion of one -way doors on burrow entrances that would let owls out of the burrow but would not let them back in. Once owls have been passively relocated, bu rrows will be NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-17 ADMINISTRATIVE DRAFT MND/IS
carefully excavated by hand and collapsed by, or under the direct supervision, of a qualified biologist.
Within 14 days of completion of the surveys, the City shall be provided with a report describing the findings, including the date, time, and duration of the surveys; identity of the surveyor(s); any established avoidance buffers in the event burrowing owls are documented to be present; and any actions taken at the direction of the City.
Western Pond Turtle: No later than seven days prior to start of project vegetation management and ground disturbing activities, a qualified biologist shall conduct a precon- struction survey for western pond turtle. The survey for western pond turtle shall focus on the ruderal habitat within the utility right -of-way southeast adjacent to the Northern Receiving Station.
Western pond turtle or other special -s
tatus wildlife found within the Project site during
the surveys shall be allowed to leave on its own volition prior to the onset of construction.
If species of special concern are found within the Project site during surveys and will not leave on its own volition, the species will be relocated to the nearest suitable habitat outside of the Project site. Species of special concern will only be handled by qualified personnel as authorized by CDFW and/or USFWS under an issued state scientific collect - ing permit (SCP), memorandum of understanding (MOU), or federal recovery permit.
Impacts to federally or state -listed species or state-listing candidate species are not authorized. If any State or federally listed, candidate, o r proposed species are detected work will be stopped and the applicant shall notify the City for coordination with CDFW and or USFWS, within 24-hours for further direction.
MM BIO-4 Pr
econstruction Nesting Bird Surveys and Nest Protection. During the nesting season (February 1 to August 31) If Project-related work is scheduled during the nesting season (typically February 15 to August 30 for small bird species such as passerines; January 15 to September 15 for owls; and February 15 to September 15 for other raptors) , preconstruction nesting bird surveys shall be conducted on the site and vicinity by a qualified biologist no more than 7 days before any work activities, including any vegetation removal or trimming, are performed at a given Project location. The surveys shall be conducted following the sequential schedule of the linear Project in a manner that minimizes potential for the surveys to expire before the construction crews proceed to a new Project work location. The survey radii surrounding the work area shall be 250 feet for passerines and 500 feet for raptors. Surveyors will search for all potential nest types (e.g., ground, cavity, shrub/tree, structural, etc.) and d etermine whether the nest is active. A nest will be determined to be active if eggs or young are present in the nest.
Upon discovery of active nests, the biological monitor will determine if there is need for a buffer or shield to minimize disturbance of the nest. Upon this determination and execution of any required minimization action, work may proceed. The extent of the determination will be based upon: acclimation of the species or individual to disturbance, nest type (cavity, tree, ground, etc.), and level and duration of construction activity. If there is a break in construction at a work location for a period of 14 or more days during nesting season, a new nesting bird survey shall be undertaken before construction is allowed to commence at that location, to determine if any nests have been established.
Bird surveys are not required outside of the nesting season (February 1 to August 31).
In the unlikely event a special-s
tatus or listed species is found nesting nearby, CDFW and USFWS will be notified, and the City will be provided with nest survey results, if requested.
When active nests are identified, monitoring for significant disturbance to the birds will NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-18 ADMINISTRATIVE DRAFT MND/IS
be implemented. Construction will not be allowed to continue unless the qualified biologist determines that no disturbance is occurring.
MM BIO-5 Preconstruction Bat Survey and Implement Avoidance Measures. A qualified biologist shall conduct surveys for special -status bats during the appropriate time of day to maxi - mize detectability to determine if bat species are roosting in trees or other vegetation requiring removal or clearance pruning for the Project. The name and credentials of the qualified biologist shall be submitted to the City no less than 14 days prior to the surveys for review and approval. The survey shall occur no less than 7 days and no more than 14 days prior to beginning tree or other vegetation removal or trimming activities. Survey methodology may include visual surveys for bats (e.g., observation of bats emerging from roosts to forage), inspection for suitable roost hab itat, bat sign (e.g, guano), or use of ultrasonic detectors (e.g., Anabat, etc). Visual surveys shall include all trees or other vegetation requiring removal or clearance pruning for the Project.
If evidence of bat use is observed, the approximate number and species of bats using the roost shall be determined. Bat detectors may be used to supplement survey efforts.
If roosts or a maternity colony are determined to be present, then a Bat Mitigation and Monitoring Plan (Plan) shall be prepared and implemented to mitigate for the loss of roosting habitat. The Plan shall include information pertaining to the species of b at and location of the roost, exclusion methods and roost removal procedures, compensatory mitigation for permanent impacts (including specific mitigation ratios and location of proposed mitigation) and monitoring to assess bat use of mitigation areas. This Plan shall be submitted to the City and CDFW for review and approval prior to project activities that could disturb roosting bats.
(b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? N
O IMPACT. Sensitive natural communities are communities that have limited distribution statewide or within a county or region and are often vulnerable to the environmental effects of projects. There is no riparian habitat or other sensitive natural community within the proposed Project area. No impacts would occur.
(c) Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) either individually or in combination with the known or probable impacts of other activities through direct removal, filling, hydrological interruption, or other means?
N
O IMPACT. The proposed Project area is highly urbanized and no waters or wetlands potentially under the jurisdiction of USACE, RWQCB, or CDFW occur on or adjacent to the proposed Project area. No impacts would occur.
(d) Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of wildlife nursery sites?
N
O IMPACT. There are no established wildlife migratory corridors or nursery sites that would be directly impacted during construction or operation of the proposed Project. The proposed Project area is not located within any Essential Habitat Connectivity Areas or Natural Landscape Blocks as identified in the California Essential Habitat Connectivity Project, or within any Important Bird Areas identified by the National Audubon Society. (Caltrans and CDFW, 2010; NAS, 2023).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-19 ADMINISTRATIVE DRAFT MND/IS
(e) Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The City’s General Plan includes conservation goals and policies pertaining to biological resources. Incorporation of MM BIO-1 through MM BIO-5 reduces potential impacts to common and protected biological resources to less than significant and is in alignment with General Plan Conservation Goal 5.10.1 G1: “The protection of fish, wildlife and their habitats, including rare and endangered species ” and Conservation Policy 5.10.1 P1: “Require environ- mental review prior to approval of any development with th e potential to degrade the habitat of any threatened or endangered species.”
There are no streams or riparian habitats located within or adjacent to the proposed Project area, therefore, the proposed Project will not impact these habitats and the proposed Project does not conflict with General Plan Conservation Goal 5.10.1 G2 or Conservation Policies 5.10.1 P2 or 5.10.1 P5.
As described in Section 4 Project Description, some vegetation and tree removal or tree trimming may be required for pole installation and vehicle access and to minimize the risk of fire by providing clearance between conductors and trees. The City Code has an ordinance (Santa Clara City Code §12.35) requiring a City permit for removing trees it defines as protected trees (§12.35.080) . Additionally, the General Plan contains Conservation Policies pertaining to trees including 5.10.1 P3 (preservation of City-designated heritage trees) and 5.10.1 P4 (protection of large private and public right-of-way trees).
An arborist survey was conducted by an International Society of Arboriculture (ISA) certified arborist and an arborist report was prepared (see Appendix D). The arborist survey identified a total of 162 trees along the proposed Project area alignment, 85 of which qualify as “protected trees” under the City’s General Plan and municipal code. No trees that the City designates as “Heritage trees” are present. Tree branches that are closer than 5 feet vertically or 10 feet horizontally to any conductor or wire would be trimmed to meet the minimum line clearance required by project engineers. The lowest conductor height would be approximately 35 to 40 feet above the ground. Under Option 1 of the proposed Project (entirely over - head), two protected trees are recommended for removal while 26 protected trees and seven additional non-protected trees may require clearance pruning. The two protected trees recommended for removal on Option 1 are located along Lafayette Street: tree #132, an olive tree located in the median approxi- mately 470 feet northwest of Agnew Road; tree #177, a deodar cedar located on the east side of Lafayette Street across from Wyatt Drive. For Option 2 (underground and overhead combination), one protected tree is recommended for removal while 22 protected t rees and 10 additional non -protected trees may require clearance pruning. The one protected tree recommended for removal on Option 2 is tree #177 as described above for Option 1. Protected trees recommended for clearance pruning for either Option 1 or Option 2 are scattered throughout the proposed Project area. The removal and clearance pruning of protected trees for the proposed Project would conflict with the City’s General Plan conservation goals and policies and the City Code. As recommended in the arborist report in Appendix D, incorporation of MM BIO-6 will ensure the proposed Project complies with the local policies and ordinances by following the tree protection requirements and recommendations of the City arborist.
Mitigation Measures to Comply with Local Tree Policies and Ordinances MM BIO 6: Tree Protection Measures for Retained Trees. To minimize the potential damage and ensure the long-term health, stability, and survival of retained trees, measures outlined in the Tree Protection Plan below shall be implemented.
Tree Protection Zone
A Tree Protection Zone (TPZ) shall be defined by the City Arborist or City designated ISA Certified Arborist for all trees within 50 feet of any excavation that could be affected by Project activities and are intended for preservation. A TPZ will not be established for NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-20 ADMINISTRATIVE DRAFT MND/IS
trees within the project area that are not within this excavation zone. TPZ will be taken down once excavation work is completed within 50 feet. A TPZ will typically include all area within the dripline of trees to be retained.
The TPZ will be protected by a fenced enclosure to prevent unauthorized access during project activities. Fencing shall be constructed of sturdy but open material (i.e., orange webbed construction fencing, chain-link) with a minimum height of 4 feet and secured in place. Warning signs (e.g. WARNING – Tree Protection Zone – This fence shall not be moved without approval by the City Arborist or a City designated arborist) shall be prominently displayed and visible from all sides of the TPZ fencing. TPZ fencing shall be installed prior to any demolition, grading, staging, stockpiling, or any other construction activities, and shall remain in place until all construction activi- ties are complete.
No construction, staging, or storage of materials, equipment or vehicles shall occur within the TPZ without advanced approval and oversight by the City Arborist or a City designated ISA Certified Arborist.
No excess soil, excess concrete or concrete wash, chemicals, refuse or other waste shall be placed within the TPZ.
The primary contractor shall be responsible for maintaining TPZ fencing and enforcing all TPZ guidelines outlined above throughout the course of the Project.
Site Grading, Excavation, and Trenching
Soil disturbance or grade changes within a TPZ are not permitted unless approved by the City Arborist or a City designated arborist. Any approved grading, excavation or trench work within a TPZ will be field staked and inspected by the City Arborist or a City designated ISA Certified Arborist prior to implementation. All grading, excavation and trenching work within a TPZ shall be performed under the observation of a City Arborist or City designated ISA Certified Arborist. All grading shall be designed to provide positive drainage away from the base of trees to be preserved and shall not create ponding within a TPZ. Grade changes in the vicinity of trees to be preserved should remain as close to natural grade as possible.
Canopy Pruning
To the extent possible, any necessary canopy pruning shall be completed prior to the commencement of construction activities.
Pruning shall be performed by a qualified tree service worker under the direction of an ISA Certified Arborist following International Society of Arboriculture tree pruning best management practices. Pruning shall not be performed by construction personnel.
Root Pruning
Any roots one inch and larger requiring removal shall be cut cleanly in sound tissue. No pruning seals or paint shall be used on wounds.
Roots two inches and greater shall remain in place and undamaged to the extent prac- ticable. If removal is required, cuts shall be made with the approval and under the direction of an ISA Certified Arborist.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.4. BIOLOGICAL RESOURCES
SEPTEMBER 2024 5.4-21 ADMINISTRATIVE DRAFT MND/IS
Communication for Tree Protection Compliance
A preconstruction meeting shall be arranged for the City Arborist or City designated ISA Certified Arborist to meet with the Project Planner, Project Contractors, Onsite Project Supervisors, Tree Pruning and Removal Contractor, and/or other appropriate Pro ject Leads to review and secure a commitment to comply with all tree protection measures. (f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Communities Conservation Plan, or other approved local, regional, or State habitat conservation plan?
N
O IMPACT. The proposed Project area is not located within the boundaries of any Habitat Conservation Plan or Natural Communities Conservation Plan. The Project area and Survey Area are located outside the Permit Area for the Santa Clara Valley Habitat Plan. Therefore, there would be no impacts.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-1 ADMINISTRATIVE DRAFT MND/IS
5.5. Cultural Resources
CULTURAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?
☐ ☒ ☐ ☐
(b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
☐ ☒ ☐ ☐
(c) Disturb any human remains, including those interred outside of dedicated cemeteries?
☐ ☒ ☐ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.5.1. Setting
This section describes the existing setting and the existing cultural resources in the Project area and discusses potential impacts associated with the proposed Project on cultural resources. Cultural resources are historic and prehistoric archaeological sites, historic -aged architectural or engineering features and structures, and places of traditional cultural significance to Native Americans and other ethnic groups.
5.5.1.1. Environmental Setting
The proposed Project is in the City of Santa Clara in Santa Clara County, CA. The Project area is a fully developed urban area and includes several existing transmission lines, including lines owned by SVP and PG&E. The proposed Project would be located in Section 27, Township 6S, Range 1W, Mount Diablo Meridian. The Project area includes residential, commercial, and industrial land uses. Existing SVP transmission and distribution power lines are located near and within the Project right-of -way (ROW).
North of Bayshore Freeway/Highway 101, land uses are primarily residential, with single and multi-family homes, and with commercial and industrial uses south of Montague Expressway and west of Lafayette Street. South of Bayshore Freeway/Highway 101, land uses are primarily light industrial uses and low-rise office buildings.
5.5.1.2. Historic Context
Prehistory
Paleoindian Period (11,500–4,500 years before present [BP]). Native American occupation and use of the Santa Clara Valley began around 11,000 BP. Natural environmental changes to the Bay Area land scape have occurred since humans’ first arrival. Many of the landforms originally available for human habitation in prehistory were inundated as sea levels rose and flooded the Franciscan Valley, burying sites with sediments. Since the earliest systematic studies of central California and Bay Area archaeology in t he 1950s, researchers have recognized that a significant portion of the archaeological record is buried in the fans and massive alluvial plains of the lowland valleys (Heizer, 1949, 1950, 1952; Heizer and Cook, 1953; Lillard et al., 1939; Meighan, 1965).
The earliest cultures of the Paleoindian/Early Holocene Period are generally considered to be repre - sented by wide- ranging mobile hunters and gatherers. Throughout California, the Paleoindian sites are most often represented by isolated fluted projectile points , although sites dating to this time period in the Bay Area are sparse. The Coyote Narrows (CA-SCR-177) and the Metcalf Creek Site (CA-SCL-178) sites in the Santa Clara Valley, are considered two of the oldest cultural deposits in the Bay Area. They w ere discovered in buried soil and dated between 11,000 and 9,500 years old (Fitzgerald and Porcasi, 2003; Hildebrandt, 1983).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-2 ADMINISTRATIVE DRAFT MND/IS
Early Horizon (4,500 –3,500 BP). The Early Horizon period is characterized by a mobile forager pattern throughout the Bay Area. The milling slab and handstone, as well as a variety of large, wide-stemmed and leaf-shaped projectile points, all emerged during this period. Local Franciscan chert dominated the Early Holocene components in the Santa Clara Valley. The Metcalf Creek Site (CA-SCL-178) yielded cultural materials as deep as 9 meters below the surface (Fitzgerald and Porcasi, 2003). New groundstone technol- ogy and the first cut shell beads in mortuaries signal a more sedentary life, regional symbolic integration, and increased regional trade in the Bay Area, beginning at about 3,500 BP, signaling the end of the Early Horizon.
Middle Horizon (3,500–1,500 BP). Sites of the Middle Horizon period are more common throughout the Santa Clara Valley. These sites usually have deep, stratified deposits that contain large quantities of ash, charcoal, fire-altered rock, fish, bird, and mammal remains. The presence of sig nificant numbers of mor- tars and pestles suggests a growing reliance upon gathered plant foods as opposed to hunted animal foods. An increase in violence is suggested by the number of Middle Horizon burials found with projectile points embedded in the bones or with other physical markers of violence (Fitzgerald, 1991).
Late Horizon Period (1,500 BP–A.D. 1769). Late Horizon sites are the most numerous and are composed of extensive midden deposits, indicating a more sedentary lifestyle. Important mound/ midden sites along the Peninsula margins include the University Village site (CA-SMA-77), the San Bruno Mountain mound (CA-SMA-40), and the Ynigo Mound (CA -SCL-12/H). Several technological and social developments characterize the Late Horizon period such as the introduction of the bow and arrow, which replaced the atlatl and dart. Dietary emphasis on acorns and se eds is prevalent in the materials recovered from exca - vated sites. This change from hunter -gatherers to an increased sedentary lifestyle is due both to more efficient resource procurement as well as a focus on staple food exploitation, the increased ability to store food at village locations, and the development of increasingly complex social and political systems including long-distance trade networks (Clark, 1989; Levy, 1978).
Ethnography
A review of the ethnographic context for the Project area is presented in Section 5.18, Tribal Cultural Resources.
Regional History
The Historic Period of the Santa Clara Valley is generally divided into three major periods: the Spanish period (1777–1821), the Mexican period (1822–1848), and the American period (1848–present).
Spanish Period (A.D. 1777–1821). Spanish explorers in the late 1760s and 1770s were the first Europeans to traverse the Santa Clara Valley. The first party, led by Gaspar de Portola and Father Juan Crespi, arrived in the Alviso–San Jose area in the fall of 1769. The following year, Pedro Fages led another party through the Santa Clara Valley, and in 1772 Fages returned to the same vicinity with Crespi. In 1776, the exploration party of Juan Bautista de Anza and Father Pedro Font traveled through the Santa Clara Valley.
The favorable reports of Anza and Font led to the establishment of both Mission Santa Clara and the Pueblo San Jose de Guadalupe in 1777 (Hart, 1987; Winther, 1935; Cutter, 1978).
Mexican Period (A.D. 1822–1848). The 1822 Mexican revolt against Spain followed by the 1834 seculari- zation of the missions changed land ownership patterns in the Santa Clara Valley. The Spanish philosophy of governance was directed at the founding of presidios, missions, and secular towns, with the land held by the Crown. In contrast, the later Mexican policy stressed individual ownership of the land. During the Mexican Period, vast tracts of land, including former mission lands that had reverted to publi c domain, were granted to individuals (Broek, 1932; Hendry and Bowman, 1940; Hart, 1987).
American Period (A.D. 1848–Present). The population of the Santa Clara Valley began to expand signif i- cantly following the 1848 Gold Rush; further population expansion resulted during construction of the NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-3 ADMINISTRATIVE DRAFT MND/IS
railroad to San Francisco in 1864 and the completion of the transcontinental railroad in 1869 (Findlay and Garaventa, 1983). Throughout the late nineteenth century rancho, pueblo, and mission lands in the Santa Clara Valley were subdivided as the result o f population growth, Anglo-American takeover, and the con - firmation of property titles. Large cattle ranches were converted to farming of crops; this agricultural land- use pattern continued throughout the American Period. During this period, agricultural experimentation took place. After 1875, the success of many agricultural experiments and expanded access to markets via rail encouraged the development of fruit production in the Santa Clara Valley. From 1875 onward, the expanding fruit market led to innovations in fruit preservation and shipping, including: drying fruit, can - ning fruit, and shipping fresh fruit in refrigerated cars. This created a wider economic boom that attracted new residents to the Santa Clara Valley (Broek, 1932; Wint her, 1935). The City of San Jose served as the County seat, a primary service, financial and social center. Since the 1990s, the agrarian land-use pattern has been displaced by residential housing, commercial centers, and the development of research and manufacturing facilities associated with the electronics industry. The contemporary focus on tech nologi- cal advancement resulted in the designation of the general region as the “Silicon Valley.”
5.5.1.3. Records Search
Aspen submitted a California Historical Resources (CHRIS) Data Request for the Project to the Northwest Information Center at Sonoma State University requesting data within 125-foot radius of the Project area.
On April 9 , 2024 , the results were received identifying one previously recorded resource/site within 125-foot radius of the Project area, a historic-age site consisting of buildings and structures. This resource does not fall within the Project area and will not be impacted. Additionally, a review of the CA Built Environment Resource Directory and National Register of Historic Places identified the Agnes State Hospital campus as being directly adjacent to the Project area and will not be impacted by the Project.
Lastly, the record search identified a total of 26 cultural resources studies that have been conducted within 125-foot radius of the Project area. Of these 26 studies, 20 of them include all or a portion of the Project area (Table 5.5-1).
The records search included a review of the following registers and lists. National Register of Historic Places (NRHP)
California Register of Historic Resources (CRHR)
California State Historical Landmarks
California Points of Historical Interest
California Inventory of Historic Resources
Santa Clara County Heritage Resource Inventory
California Built Environment Resource Directory (BERD) City of Santa Clara Historic Survey Complete Report – 1981 Table 5.5-1. Cultural Resources Reports Within Project Area Report No. Author Year Study
S-004486 Marianne Fazio 1978 Field reconnaissance of parcels along Mission College Boulevard in Santa Clara (letter report)
S-006066 N/A 1983 Data Recovery Plan for the Guadalupe Corridor Transportation Project, Santa Clara County, California
S-008387 David Chavez 1980
Archaeological Resources Assessment for the Guadalupe Corridor Alternatives Analysis Draft Environmental Impact Statement:
Santa Clara County, California
S-014230 Robert Cartier, Allika Ruby,
Jason Bass, and Mike Kelley 1992 Evaluation of Archaeological Resources for the San Jose/Santa Clara Nonpotable Water Reclamation Project
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-4 ADMINISTRATIVE DRAFT MND/IS
Report No. Author Year Study
S-018367 Mark Hylkema 1995
Historic Property Survey Report and Finding of No Effect for the Proposed Ramp Metering and HOV Ramp Project, 4 -SCL-101 PM
40.0/52.5, EA 132451
S-018377
Robert Cartier, Lynne
Eckert, Jeanne Goetz, and
Jon Reddington
1996
Cultural Resource Evaluation of the Santa Clara Pipe Alignment for the South Bay Water Recycling Project
S-019072
Colin I. Busby, Donna M.
Garaventa, Melody E.
Tannam, and Stuart A.
Guedon
1996
Historic Properties Treatment Plan, South Bay Water Recycling Program.
S-019424 John Holson 1997 Cultural Resources Survey for the Los Esteros Project, Santa Clara County (letter report)
S-020691 Miley P. Holman 1997
Archaeological Field Inspection of the City of Santa Clara Northern Receiving Station, Santa Clara, Santa Clara County, California (letter report)
S-021137 Michael R. Corbett and
Stuart A. Guedon 1996 Archaeological Resources Review, Agnews West Campus, City of Santa Clara, Santa Clara County, California
S-022705 Hannah Ballard, John
Holson, and Stephanie Pau 2000
Archaeological Survey and Record Search Results for the MCI WorldCom: Fremont, San Jose 12, San Mateo, and Santa Clara Fiber Optic Segments in Alameda, San Mateo and Santa Clara Counties, California
S-022725 Hannah Ballard, John
Holson, and Stephanie Pau 2000 Archaeological Survey and Record Search Results for the Fourteen Broadwing Bay Area Fiber Optic Segments, California: Final Report S-023356 Ward Hill 1999
Historic Property Survey Report, Montague Expressway Project, Cities of Santa Clara, San Jose and Milpitas, Santa Clara County, California
S-023400 N/A 2000 Addendum No. 1: Cultural Resources Assessment, PG&E Proposed Northeast San Jose Transmission Reinforcement Project
S-024980 Colin I. Busby 2000
Sun Microsystems Santa Clara Campus Project, Agnews West Campus, Archaeological Monitoring Closure Report, Phase 1 (July 1998 to December 1999) (letter report)
S-028016 Colin I. Busby 2002
Agnews (West) Family Housing, Rivermark Master Plan Parcel 26, Currently Vacant Parcel, City of Santa Clara, Santa Clara County, Archaeological Monitoring Closure Report (letter report) S-033061
Nancy Sikes, Cindy
Arrington, Bryon Bass,
Chris Corey, Kevin Hunt,
Steve O'Neil, Catherine
Pruett, Tony Sawyer,
Michael Tuma, Leslie
Wagner, and Alex Wesson
2006
Cultural Resources Final Report of Monitoring and Findings for the Qwest Network Construction Project, State of California S-036715 N/A 2009
Historic Property Survey Report/Finding of Effect, South Bay Water Recycling (SBWR) Stimulus Projects, Santa Clara Industrial 1, City of Santa Clara, Santa Clara County
S-039040 N/A 2008 Archaeological Assessment Report, 49ers Stadium Project - Santa Clara, Santa Clara County
S-045670 Kathleen Kubal 2014
Historic Property Survey Report, US 101 Express Lanes Project, Santa Clara County, California, Project No. 0412000459/EA 2G7100, 04-SCL-101 PM 16.00/52.55, 04-SCL-85 PM 23.0/24.1 NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-5 ADMINISTRATIVE DRAFT MND/IS
Report No. Author Year Study
S-004486 Marianne Fazio 1978 Field reconnaissance of parcels along Mission College Boulevard in Santa Clara (letter report)
S-006066 N/A 1983 Data Recovery Plan for the Guadalupe Corridor Transportation Project, Santa Clara County, California
S-008387 David Chavez 1980
Archaeological Resources Assessment for the Guadalupe Corridor Alternatives Analysis Draft Environmental Impact Statement:
Santa Clara County, California
S-014230 Robert Cartier, Allika Ruby,
Jason Bass, and Mike Kelley 1992 Evaluation of Archaeological Resources for the San Jose/Santa Clara Nonpotable Water Reclamation Project
S-018367 Mark Hylkema 1995
Historic Property Survey Report and Finding of No Effect for the Proposed Ramp Metering and HOV Ramp Project, 4 -SCL-101 PM
40.0/52.5, EA 132451
S-018377
Robert Cartier, Lynne
Eckert, Jeanne Goetz, and
Jon Reddington
1996
Cultural Resource Evaluation of the Santa Clara Pipe Alignment for the South Bay Water Recycling Project
S-019072
Colin I. Busby, Donna M.
Garaventa, Melody E.
Tannam, and Stuart A.
Guedon
1996
Historic Properties Treatment Plan, South Bay Water Recycling Program.
5.5.1.4. Native American Heritage Commission and Native American Consultation A search of the Sacred Lands File database from the Native American Heritage Commission (NAHC) in Sacramento, California, was conducted. The record search of the NAHC Sacred Lands File was completed with negative results (i.e., no records found). Assembly Bill 52 Native American consultation is discussed in Section 5.18 (Tribal Cultural Resources).
5.5.1.5. Regulatory Background
State
State of California CEQA Guidelines. State of California CEQA Guidelines require that historical resources and unique archaeological resources be considered during the CEQA review process (CEQA Guidelines §15064.5; PRC §21083.2). If feasible, adverse effects to the significance of historical resources must be avoided or the effects mitigated (CEQA Guidelines §15064.5(b)(4)). State CEQA Guidelines require that all feasible mitigation be undertaken even if the prescribed mitigation does not mitigate impacts to a less than significant level (California Office of Historic Preservation (OHP) 2001b:6).
The term that CEQA uses for significant cultural resources is “historical resource,” which is defined as a resource that meets one or more of the following criteria: (1) listed in, or determined eligible for listing in, the California Register of Historical Resources (California Register); ( 2) listed in a local register of historical resources as defined in PRC Section 5020.1(k); (3) identified as significant in a historical resource survey meeting the requirements of PRC Section 5024.1(g); or (4) determined to be a historical resource by a project’s lead agency (PRC Section 21084.1 and State CEQA Guidelines §15064.5(a)). A his torical resource consists of:
Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California…. Generally, a resource shall be considered by the lead agency to be ‘his - torically significant’ if the resource meets the criteria for listing on the California Register of Historical Resources (§15064.5(b)(3)).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-6 ADMINISTRATIVE DRAFT MND/IS
CEQA Guidelines Section 15064.5(a)(3). In accordance with CEQA Guidelines Section 15064.5(b), a project with an effect that may cause a substantial adverse change in the significance of a historical resource is a significant effect on the environment.
CEQA requires a lead agency to determine if an archaeological resource meets the definition of a historical resource, a unique archaeological resource, or neither (CEQA Guidelines §15064.5(c)). Prior to considering potential impacts, the lead agency must determine whether an archaeological resource meets the definition of a historical resource in CEQA Guidelines §15064.5(c)(1). If the archaeological resource meets the definition of a historical resource, then it is treated like any other type of historical resource in accordance with CEQA Guidelines §15126.4. If the archaeological resource does not meet the defini tion of a historical resource, then the lead agency determines whether it meets the definition of a unique archaeological resource as defined in CEQA Statutes §21083.2(g). In practice, most a rchaeological sites that meet the definition of a unique archaeological resource also meet the definition of a his torical resource. If the archaeological resource meets the definition of a unique archaeological resource, then it must be treated in accordance with CEQA Statutes §21083.2. If the archaeological resource does not meet the definition of a historical resource or a unique archaeological resource, then effects to the resource are not considered significant effects on the environment (CEQA Guidelines §15064.5(c)(4)).
California Health and Safety Code Section 7050.5. California HSC Section 7050.5 states that in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the coroner of the county in which the remains are discovered has deter - mined whether or not the remains are subject to the coroner’s authority. If the human remains are o f Native American origin, the County Coroner must notify the Native American Heritage Commission (NAHC) within 24 hours of this identification. The NAHC will identify a Native American Most Likely Descendant (MLD) to inspect the site and provide recommendations for the proper treatment of the remains and associated grave goods.
Public Resources Code Section 5097.5. PRC Section 5097.5 provides for the protection of cultural resources.
This PRC section prohibits the removal, destruction, injury, or defacement of archaeological features on any lands under the jurisdiction of State or local authorities.
California Register of Historical Resources Criteria of Evaluation. The State of California Historical Resources Commission has designed the California Register for use by State and local agencies, pri vate groups, and citizens to identify, evaluate, register, and protect California’s historical resources. The California Register is the authoritative guide to the State’s significant historical and archaeological resources.
The California Register program encourages public recognition and protection of resources of architec - tural, historical, archaeological, and cultural significance, identifies historical resources for state and local planning purposes, determines eligibility for State historic preservation grant funding, and affords certain protections under CEQA. The following criteria are used when determining if a particular resource has architectural, historical, archaeological, or cultural significance. Criterion 1: Is the resource associated with events that have made a significant contribution to the broad patterns of local or regional history or the cultural heritage of California or the United States? Criterion 2: Is the resource associated with the lives of persons important to local, California, or national history?
Criterion 3: Does the resource embody the distinctive characteristics of a type, period, region, method of construction, or represent the work of a master or possesses high artistic values? Criterion 4: Has the resource yielded, or have the potential to yield, information important to the prehistory or history of the local area, California, or the nation? NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-7 ADMINISTRATIVE DRAFT MND/IS
Local
City of Santa Clara General Plan (2010 -2035). The City of Santa Clara’s current General Plan provides information to the community to define acceptable development. It is a guide for decisions by the City Council, Planning Commission, and other government agencies on specific development applications. The following overarching Goals and Policies are identified with regard to architectural and built environment resources:
City of Santa Clara Historical and Landmarks Commission. To support its historic preservation goals, the City established a Historical and Landmarks Commission and obtained recognition by the State Office of Historic Preservation as a Certified Local Government (CLG). The Historical and Landmarks Commission advises the City Council on all matters pertaining to historical landmarks, names, and renaming of streets, museums and the establishment thereof in the City, and in the marking and preservation of hist orical landmarks and places. As required by the State CLG program, the City has established a list of Architect - urally or Historically Significant Properties, which is the foundation for the Commission’s recommenda- tions. The Criteria for Local Significance establishes evaluation measures, to ensure that the resource is at least 50 years old and that the property is associated with an important individual or event, an archi- tectural innovation, and/or an archaeological contribution in order to be deemed significant. The City maintains a list of qualified historic consultants for these evaluations.
Architecturally or Historically Significant Properties refer to prehistoric and historic features, structures, sites or properties that represent important aspects of the City’s heritage. Historic Preservation policies strengthen the City’s Historic Preservation Goals, providing direction for changes to historic resources and new development proposed within 100 feet of historic properties in order to evaluate any potential effects on the historic context for the resource. A 100 –foot radius, defined as the A rea of Historic Sensi- tivity, is approximately equal to all properties abutting, across the street, and adjacent to abutting prop - erties from a historic resource. This would comprise a little less than a typical city block. Preservation of Santa Clara’s long history is also supported by policies that protect archaeological resources, such as relics found in burial sites.
City of Santa Clara Criteria for Local Significance. The Criteria for Local Significance were adopted on April 8, 2004, by the City of Santa Clara City Council. These criteria establish evaluation measures that help to determine significance for properties not yet included on the historic list. Any building, site, or property in the City that is 50 years old or older and meets certain criteria of architectural, cultural, historical, geo- graphical or archeological significance is potentially eligible. As buildings and other resources age, a ddi- tional properties will be added to the inventory. In order to accomplish this, a property owner can apply to have their property listed as a historic resource or the City can nominate properties. The Historical and Landmarks Commission evaluates these applications and forwards a recommendation to the City council.
Updates to the Historic Preservation and Resource Inventory require an amendment to the General Plan. Criteria for Historical or Cultural Significance. To be historically or culturally significant, a property must meet at least one of the following criteria:
1. The site, building or property has character, interest, integrity and reflects the heritage and cultural development of the city, region, State, or nation.
2. The property is associated with a historical event.
3. The property is associated with an important individual or group who contributed in a signifi cant way to the political, social and/or cultural life of the community.
4. The property is associated with a significant industrial, institutional, commercial, agricultural, or transportation activity.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-8 ADMINISTRATIVE DRAFT MND/IS
5. A building’s direct association with broad patterns of local area history, including development and settlement patterns, early or important transportation routes or social, political, or econo mic trends and activities.
6. Included is the recognition of urban street pattern and infrastructure.
7. A notable historical relationship between a site, building, or property’s site and its immediate envi- ronment, including original native trees, topographical features, outbuildings or agricultural setting. Criteria for Architectural Significance. To be architecturally significant, a property must meet at least one of the following criteria:
1. The property characterizes an architectural style associated with a particular era and/or ethnic group.
2. The property is identified with a particular architect, master builder or craftsman.
3. The property is architecturally unique or innovative.
4. The property has a strong or unique relationship to other areas potentially eligible for preservation because of architectural significance.
5. The property has a visual symbolic meaning or appeal for the community.
6. A building’s unique or uncommon building materials, or its historically early or innovative method of construction or assembly.
7. A building’s notable or special attributes of an aesthetic or functional nature. These may include massing, proportion, materials, details, fenestration, ornamentation, artwork or functional layout. Criteria for Geographic Significance. To be geographically significant, a property must meet at least one of the following criteria:
1. A neighborhood, group or unique area directly associated with broad patterns of local area history.
2. A building’s continuity and compatibility with adjacent buildings and/or visual contribution to a group of similar buildings.
3. An intact, historical landscape or landscape features associated with an existing building.
4. A notable use of landscaping design in conjunction with an existing building.
5.5.2. Environmental Impacts and Mitigation Measures
(a) Would the project cause a substantial adverse change in the significance of an historical resource pursuant to §15064.5 [§15064.5 generally defines historical resource under CEQA]? L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The record search did not identify any resources that meet the definition of a historical resource within the Project area, thus no known historical resources will be impacted. Although no known historical resources have been identified within the Project area, there remains the possibility that presently unidentified historical resources exist below the ground sur - face, as both Project options involve some level of ground disturbance. Unknown buried resources could be damaged or destroyed during ground disturbing work, which would con stitute a significant impact absent mitigation. Implementation of mitigation measure MM CR-1 would evaluate and protect unantici- pated discoveries, thereby reducing this impact to less than significant.
MM CR-1 Worker Training and Management of Unanticipated Discoveries of Historical Resources, Unique Archaeological Resources. SVP shall conduct a worker environmental awareness program (WEAP) for Project personnel who might encounter or alter historical resources or important/unique archaeological materials during Project work. This program may be combined with any similar required program, such as for biological resources. The WEAP will include a kickoff tailgate session that describes how to identify cultural resources and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-9 ADMINISTRATIVE DRAFT MND/IS
what to do if an unanticipated discovery is made during construction, presents site avoid- ance requirements and procedures to be followed if unanticipated cultural resources are discovered during Project construction, and includes a discussion of disciplinary and other actions that could be taken against persons violating historic preservation laws and SVP policies.
If previously unidentified cultural resources are identified during construction, con struc- tion work within 50 feet of the find shall be halted and directed away from the discovery until a Secretary of the Interior qualified archaeologist assesses the significance of the resource. The archaeologist, in consultation with the City, any interested Tribes, and any other responsible public agency, shall make the necessary plans for treatment of the find(s) and for the evaluation and mitigation of impacts if the finds are found to be eligible to the California Register, qualify as a unique archaeological resource under C alifornia Environmental Quality Act Section 21083.2, or are determined to be tribal cultural resource as defined in Section 21074.
(b) Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. Although no known archaeological resources have been previously identified within the Project area, there remains the possibility that presently unidentified archaeological resources exist below the ground surface as both Project options involve some level of ground disturbance. Unknown buried archaeological resources could be discovered and damaged or destroyed during ground disturbing work, which would constitute a significant impact absent miti gation.
Implementation of mitigation measure MM CR-1 would evaluate and protect unanticipated discoveries of archaeological resources, thereby reducing this potential impact to a less than significant level.
MM CR-1 Worker Training and Management of Unanticipated Discoveries of Historical Resources, Unique Archaeological Resources. [see full text under Item (a) above.] (c) Would the project disturb any human remains, including those interred outside of formal ceme - teries?
LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. There is no indication that human remains are present within the Project area. Background archival research failed to find any potential for human remains (e.g., existence of formal cemeteries) in the area. However, with both Project options involving some level of ground disturbance, it is possible that previously unknown human remains could be discovered and damaged or destroyed during ground disturbance, which would constitute a significant impact absent mitigation. Implementation of mitigation measure MM CR -2, which requires evaluation, protection, and appropriate disposition of human remains, would reduce this potential impact to a less than significant level.
MM CR-2 Treatment of Human Remains. Any human remains discovered are to be treated with respect and dignity. Upon discovery of human remains, all work within 50 feet of the dis- covery area must cease immediately, nothing is to be disturbed, and the area must be secured. The Santa Clara County Coroner’s Office must be called. The Coroner has two working days to examine the remains after notification. The appropriate land manager of the site is to be called and informed of the discovery. It is very important that the suspected remains, and the area around them, are undisturbed and the proper author- ities called to the scene as soon as possible, as it could be a crime scene. The Coroner will determine if the remains are archaeological/historic or of modern origin and if there are any criminal or jurisdictional questions.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.5. CULTURAL RESOURCES
SEPTEMBER 2024 5.5-10 ADMINISTRATIVE DRAFT MND/IS
After the Coroner has determined the remains are archaeological/historic-era, the Coroner will make recommendations concerning the treatment and disposition of the remains to the person responsible for the excavation, or to his or her authorized representative. If the Coroner believes the remains to be those of a Native American, he/she shall contact the Native American Heritage Commission (NAHC) by telephone within 24 hours.
The NAHC will immediately notify the person it believes to be the most likely descendant (MLD) of the remains. The MLD has 48 hours to make recommendations to the landowner for treatment or disposition of the human remains. If the descendant does not make recom- mendations within 48 hours, the landowner shall reinter the remains in an area of the prop- erty secure from further disturbance. If the landowner does not accept the descendant’s recommendations, the owner or the descendant may request mediation by NAHC.
According to the California Health and Safety Code, six (6) or more human burials at one (1) location constitute a cemetery (Section 8100), and willful disturbance of human remains is a felony (Section 7052).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.6. ENERGY
SEPTEMBER 2024 5.6-1 ADMINISTRATIVE DRAFT MND/IS
5.6. Energy
ENERGY
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
☐ ☐ ☒ ☐
(b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.6.1. Setting
Silicon Valley Power, the City of Santa Clara ’s municipal electric utility, owns power generation facilities, has investments in joint ventures that produce electric power, and trades power on the open market.
These efforts are directed toward ensuring its retail electricity customers (the citizens, organizations, and businesses of the City of Santa Clara) a highly reliable source of electric power at low, stable rates (City of Santa Clara, 2024).
SVP is proposing to construct approximately 2.24 miles of a new overhead and/or partially underground 115 kV transmission line. The NRS to KRS 115 kV Transmission Line Project would be built to accommodate energization at 230 kV, however it would initially be operated at 115 kV. The SVP electric load has been growing in recent years, as evidenced by electricity consumption data gathered by the California Energy Commission shown in Table 5.6-1 (CEC, 2023a).
Table 5.6-1. Electricity Consumption for Load Served by SVP (million kWh per year) Sector, Served by SVP 2018 2019 2020 2021 2021
Ag & Water Pump 0.03 0.08 0.10 0.09 0.09
Commercial Building 2393.16 2437.06 2547.24 2835.04 3164.39 Commercial Other 41.52 43.80 44.25 42.40 39.10
Industry 862.57 821.66 816.73 835.54 852.06
Mining & Construction 24.74 35.63 46.50 73.54 96.72
Residential 226.01 234.49 264.73 241.90 261.80
Streetlight 3.50 3.00 3.00 4.39 4.39
Total Electricity Consumption 3551.53 3575.73 3722.54 4032.90 4418.54 Note: Usage expressed in millions of kWh (one million kWh equals one gigawatt-hour or GWh).
Source: CEC, 2024; Electricity Consumption by Entity.
Regulatory Background
Energy Action Plan and Loading Order. California has mandated and implemented aggressive energy-use reduction programs for electricity and other resources. In 2003, California’s first Energy Action Plan (EAP) established a high-level, coherent approach to meeting California’s electricity and natural gas needs and set forth the “loading order” to address California’s future energy needs. The “loading order” established that the state, in meeting its energy needs, would invest first in energy efficiency and demand -side resources, followed by renewable resources, and only then in clean conventional electricity supply (CPUC, 2008). Since that time, the California Public Utilities Commission (CPUC) and California Energy Commission (CEC) have overseen the plans, p olicies, and programs for prioritizing the preferred resources, including energy efficiency and renewable energy.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.6. ENERGY
SEPTEMBER 2024 5.6-2 ADMINISTRATIVE DRAFT MND/IS
California’s Renewables Portfolio Standard (RPS). Electric utilities in California must procure a minimum quantity of the electricity sales from eligible renewable energy resources as specified by RPS require - ments. The most-recent update to the RPS targets was in 2018 , with the “100 Percent Clean Energy Act of 2018” [Senate Bill 100 (SB 100)], which establishes the policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of retail sales of electricity to California end-use customers by December 31, 2045. SB 100 requires the CPUC and CEC to ensure that implementation of this policy does not cause or contribute to greenhouse gas emissions increases elsewhere in the western power grid.
Integrated Resource Planning. An Integrated Resource Plan (IRP) is an electricity system planning docu - ment that lays out the energy resource needs, policy goals, physical and operational constraints, and the general priorities or proposed resource choices of an electric utility, including customer -side preferred resources. Through Senate Bill 350 (De León, Chapter 547, Statutes of 2015) (SB 350), the publicly owned utilities (POU) such as SVP must adopt and file an IRP that is subject to a review by the CEC for consistency with statewide targets for energy efficiency, renewable resources, and greenhouse gas emissions reduc - tions. The IRP must also consider how renewable generation, grid operational efficiencies, energy storage, and distributed resources (including energy efficiency) serve to meet the peak hour energy and reliability needs. On December 5, 2023, the City Council approved SVP’s most-recent IRP (SVP, 2023), and SVP transmitted the 2023 IRP to the CEC for review in May 2024.
State CEQA Guidelines. The California Natural Resources Agency adopted certain amendments to the State CEQA Guidelines effective in 2019, to change how CEQA Lead Agencies consider the environmental impacts of energy use. CEQA Guidelines Section 15126.2(b) and Appendix F require analysis of a project’s energy use to assure that energy implications are considered in project decisions. CEQA requires a discus- sion of the potential environmental effects of energy resources used by projects, with particular emphasis on avoiding or reducing the “wasteful, inefficient, and unnecessary consumption of energy” (see Public Resources Code section 21100(b)(3)).
5.6.2. Environmental Impacts and Mitigation Measures
(a) Would the project result in potentially significant environmental impact due to wasteful, ineffi - cient, or unnecessary consumption of energy resources, during project construction or operation? LESS THAN SIGNIFICANT. Construction activities would consume nonrenewable energy resources, primarily petroleum-based transportation fuels (diesel and gasoline), to power construction equipment and vehicles. The short-term use of fuels by equipment and motor vehicle trips during construction would be necessary to install the transmission line. The total energy requirements during construction are not quantified within the Project Description. However, the use of nonrenewable resources can be estimated in terms of the volumes of diesel and gasoline, by reviewing the products of combustion of these fuels (e.g., the quantities of greenhouse gases would be directly proportional to the volumes of fuels used).
Based on the anticipated quantities of carbon dioxide equivalent (CO2e) emissions estimated as 641 metric tons of CO2e (in Section 5 .8, Greenhouse Gas Emissions), approximately 63,000 gallons of diesel fuel
5 would likely be used for Project construction over approximately 14 months.
To put these volumes into perspective, data from the CEC indicate that California’s refineries normally produce around 2.0 million barrels per week of diesel and 6.2 million barrels per week of gasoline (CEC, 2023b). This amounts to statewide production of roughly 12 million gallons of diesel and 37.2 million gallons of gasoline each day. In comparison, the total diesel fuel volume used during the entirety of Project construction (63,000 gallons) would represent less than a percent of California’s typical daily production volume (12 million gallons per day).
5 Note: The volume of diesel fuel used can be approximated from an emission factor of 10.2 kg CO2 per gallon, based on the fuel heating value (0.138 million British thermal units per gallon) multiplied by the default CO2 emission factor (73.96 kg CO2 per million British thermal unit), in Table 2-3 of Title 17, California Code of Regulations, Section 95115.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.6. ENERGY
SEPTEMBER 2024 5.6-3 ADMINISTRATIVE DRAFT MND/IS
Operations, including inspection, patrol, and maintenance of the Project components would also require use of fossil fuel resources for routine upkeep. The energy used by the Project during construction and operation would not be wasteful, inefficient, or unnecessary considering the new facilities that would increase system reliability, and no potentially significant environmental impact would occur due t o the direct or indirect energy consumption of the Project.
(b) Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
L
ESS THAN SIGNIFICANT. The proposed Project would increase SVP’s system capacity and reliability. The trans- mission line will allow energy to be balanced and redistributed within SVP's transmission receiving stations. This line will allow SVP to serve the new load growth that is projected based on SVP’s forecasted load growth within the City over the next severa l years. The Project would neither conflict with nor obstruct state or local plans for renewable energy or energy efficiency, and, therefore, would have no impact on those plans. This impact would be less than significant, and no mitigation is required.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-1 ADMINISTRATIVE DRAFT MND/IS
5.7. Geology and Soils
GEOLOGY AND SOILS
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist -Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
☐ ☐ ☐ ☒
ii) Strong seismic ground shaking? ☐ ☐ ☒ ☐
iii) Seismic-related ground failure, including liquefaction? ☐ ☒ ☐ ☐ iv) Landslides? ☐ ☐ ☐ ☒
(b) Result in substantial soil erosion or the loss of topsoil? ☐ ☒ ☐ ☐ (c) Be located on geologic units or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on - or off -site landslide, lateral spreading, subsidence, liquefaction, or collapse?
☐ ☒ ☐ ☐
(d) Be located on expansive soil, as defined in Table 18 1 B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property?*
☐ ☒ ☐ ☐
(e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
☐ ☐ ☐ ☒
(f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
☐ ☒ ☐ ☐
*Geology and Soils question (d) reflects the current 2016 California Building Code (CBC), which is based on the International Building Code (2015), effective January 1, 2017. The CBC is updated every three years.
Significance criteria established by CEQA Guidelines, Appendix G.
5.7.1. Setting
This section describes geology, soils, and seismic conditions, and analyzes environmental impacts related to geologic and seismic hazards that could result from the implementation of the proposed Project. The following discussion addresses existing environmental conditions in the affected area, identifies and analyzes environmental impacts, and recommends measures to reduce or avoid any adverse impacts anticipated from Project construction and operation. In addition, existing laws and regulations relevant to geologic and seismic hazards are described. In some cases, compliance with these existing laws and regula- tions would serve to reduce or avoid certain impacts that might otherwise occur with the implementation of the Project.
Baseline geologic, seismic, and soils information were collected for the Project route and surrounding area from published and unpublished literature, GIS data, and online sources. Data sources included geologic literature from the U.S. Geological Survey and California Geological Survey, and other readily available online reference materials. The study area for geology and soils is defined as the Project route and the areas immediately adjacent to the proposed Project for most geologic and soils topics with the exception that the study area related to seismically induced ground shaking includes significant regional active and potentially active faults within 50 miles of the proposed Project.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-2 ADMINISTRATIVE DRAFT MND/IS
5.7.1.1. Regional Geologic Setting
The Project site is in the Santa Clara Valley, a relatively flat, elongate alluvial basin, in the Coa st Ranges geomorphic province of California. The Santa Clara Valley is part of large structural depression that extends from south of Hollister to north of Santa Rosa and includes the San Pablo and San Francisco Bays (Norris & Webb, 1976). The Santa Clara Valley is bordered on the west and southwest by the Santa Cruz Mountains and on the east by the Diablo Mountain Range. The San Francisco Bay borders the Santa Clara Valley to the north, west, and east along its shorelines. The average slope of the valley floor ranges from nearly flat to about 2 percent grade, with the surrounding hil lsides having steeper grades (City of Santa Clara, 2011).
The Coast Ranges geomorphic province is characterized by ridges and valleys and by strongly deformed sedimentary and metamorphic rocks of the Franciscan Complex and sediments deposited by a series of merging alluvial fans formed by streams draining from the adjacent mountains during recent geologic times. The area’s groundwater aquifers occur in the alluvial sediments. The alluvial deposits in the Santa Clara Valley are derived from the Diablo Range and Santa Cruz Mountains. In the north-central area of the Santa Clara Valley, the alluvial deposits are interbedded with bay and lacustrine deposits. Soil types in the area include clay (low -lying central areas), loam and gravelly loam (northern area of the Santa Clara Valley), and eroded rock clay loam (foothills) (City of Santa Clara, 2011).
5.7.1.2. Local Geology
Most of the City is located on a gently sloping area of the valley floor in the north -central portion of the Santa Clara Valley. The City is primarily situated on alluvial fan deposits consisting of gravel, sand and finer sediments. Natural levee deposits consisting of silt and clay are located along the City’s major streams.
Man-made engineered levees for flood control have been constructed over many but not all of the natural levee deposits (City of Santa Clara, 2011). The Project area is mapped as being underlain by alluvial surficial sediments consisting of Holocene alluvial clay soil which includes bay mud deposits (Dibblee and Minch, 2005) and Holocene fine grained alluvial fan deposits generally containing large percentages of clay and fat clay (CGS, 2001). Based on Pleistocene alluvium contour mapping Pleistocene alluvium is located between approximately 30 to 35 feet below ground surface (Helley, 1990).
Artificial Fill. Although not mapped along the Project alignment or immediate vicinity (Dibblee and Minch, 2005), artificial fill, often referred to as undocumented or man-made fill, has been placed throughout the City in developed areas and likely underlies portions of the Project alignment. Generally, artificial fill consists of varying amounts of sand, clay, and gravel, and may have local areas of man -made debris such as lumber, concrete and brick fragments, and industrial slag materials in areas of undo cumented or very old fill. Consistency of the clays range from soft to very stiff, and density of the sands range from very loose to medium dense. The artificial fills in the City include materials that were placed to fill in naturally low areas, to create building pads and roadways, and to construct landfills. In some cases, older, non- engineered fills have been placed in the City of Santa Clara without standards for fill materials or com - paction. Building on non-engineered fills can result in the excessive settlement of structures, pavements, and utilities. However, artificial fills placed using current engineering practices would avoid impacts from excessive or differential settlement (City of Santa Clara, 2011).
5.7.1.3. Soils
Soils within the Project area reflect the underlying rock type, the extent of weathering of the rock, the degree of slope, and the degree of human modification. The Project route is underlain by four soil associations, identified from south to north as the Urban Land, Urban Land -Hangerone complex, Urban Land–Clear Lake complex, and the Urban Land– Campbell complex (NRCS, 2024). These soils are all identified as occurring on basin floors with slopes of 0 to 2 percent. Urban Land is a miscellaneous area, NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-3 ADMINISTRATIVE DRAFT MND/IS
identified by the NRCS as having little to no soil material and supports little to no vegetation; Urban Land soil parent material consists of disturbed and human transported material. The Hangerone component of the Urban Land-Hangerone complex is poorly drained and consists primarily of cla y, with some clay and gravelly loam, the Clear Lake component of the Urban Land -Clear Lake complex is poorly drained and consists of silty clay, and the Campbell component of the Urban Land – Campbell complex is moderately well drained and consists of silt loam, silty clay loam, and silty clay (NRCS, 2024). The parent material for the Hangerone, Clear Lake, and Campbell components of the above complexes is alluvium derived from metamorphic and sedimentary rock and/or alluvium derived from metavolcanics (NRCS, 2024).
Expansive soils are characterized by their ability to undergo significant volume change (shrink and swell) due to changes in soil moisture content. Change in soil moisture can result from rainfall, landscape irrigation, utility leakage, roof drainage, and/ or perched groundwater. Expansive soils are typically very fine grained with a high to very high percentage of clay. Such soil conditions can affect the structural integrity of buildings and other structures. Soils with moderate to high shrink -swell potential would be classified as expansive soils. Expansion potential of the Urban Land soils underlying the proposed Project route is undetermined, however the Hangerone, Clear Lake, and Campbell components of the soil com - plexes underlying the Project all have very high linear extensibility (shrink-swell potential) (NRCS, 2024).
Weak (loose or poorly consolidated) soils can compress, collapse, or spread laterally under the weight of buildings and fill, causing settlement. Usually, the thickness of weak soil will vary and differential settle - ment will occur. Weak soils also tend to amplify shaking during an earthquake, and can be susceptible to liquefaction, as discussed below (City of Santa Clara, 2011). According to hazard mapping compiled by the County of Santa Clara (2012), only soils near the Bay at the city’s northernmost edge are identified as compressible.
Potential soil erosion hazards vary depending on the use, conditions, and textures of the soils. The pro - perties of soil that influence erosion by rainfall and runoff are those that affect the infiltration capacity of a soil and those that affect the resistance of a soil to detachment and being carried away by flowing water.
Soils containing high percentages of fine sands and silt and that are low in density, are generally the most erodible. Additionally, soils on steeper slopes would be more susceptible to erosion due to the effects of increased surface flow (runoff) on slopes where there is little time for water to infiltrate before runoff occurs. With increasing clay and organic matter content of soils, the potential for erosion decreases. Clays act as a binder to soil particles, reducing the potential for erosion. Soil erosion hazards are not identified for the Urban Land soils, however the Hangerone and Clear Lake components of two of the soil complexes have moderate potential for both wind and water erosion and the Campbell component of the third soil complex underlying the Project has moderate to low potential for wind erosion and moderate to high potential for erosion by water (NRCS, 2024).
5.7.1.4. Subsidence
Land subsidence can occur in valleys containing aquifer systems that are, in part, made up of fine-grained sediments and that have undergone extensive groundwater development. Land subsidence is generally characterized by a broad zone of deformation where differential settlements are small. The main cause of subsidence in California is groundwater pumping. As groundwater is withdrawn, the pore-fluid pressure in the sediments decreases, allowing the weight of the overlying sediment to permanently compact or compress the fine-grained units. This effect is most pronounced in younger, unconsolidated sediments.
The effects of subsidence include damage to buildings and infrastructure, increased flood risk in low-lying areas, and lasting damage to groundwater aquifers and aquatic ecosystems.
Between about 1915 and 1969, the northern portion of Santa Clara County experienced as much as 13 feet of subsidence due to excessive pumping of groundwater. Over 100 square miles were affected. from San Jose to southern San Francisco Bay (SCCVWD, 2024). The Santa Clara Valley Water District ’s aquifer NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-4 ADMINISTRATIVE DRAFT MND/IS
recharge efforts start ed in the mid-1930s . Creating ponds and reservoirs, importing water, and imple- menting a pumping tax in 1964 proved successful in allowing groundwater levels to recover (USGS, 2024a).
By about 1970, subsidence was essentially halted because of investments in reservoirs, diversification of water supplies, and groundwater recharge, along with management programs that allowed groundwater conditions to recover (SCCWD, 2024).
5.7.1.5. Slope Stability
Important factors that affect the slope stability of an area include the steepness of the slope, the relative strength of the underlying rock material, and the thickness and cohesion of the overlying colluvium and alluvium. The steeper the slope and/or the less strong the rock, the more likely the area will be susceptible to landslides. The steeper the slope and the thicker the colluvium, the more likely the area is susceptible to debris flows. Another indication of unstable slopes is the presence of old or recent landslides or debris flows.
The proposed Project is on the gently sloping and nearly flat valley floor, is along flat graded parcels and would not be subject to landslides. According to landslide hazard mapping compiled by the County of Santa Clara (2012), the City of Santa Clara and the proposed Project area are not within any landslide hazard zones and the California Geological Survey (CGS) does not map and any landslide hazard zones within the city nor at or near the proposed Project (CGS, 2024a).
5.7.1.6. Seismicity
Under the Alquist -Priolo Act, seismic faults are classified as a Holocene active, a Pre -Holocene, Age- undetermined, or inactive, based on the following criteria (CGS, 2018):
Holocene-active faults: Faults that have moved during the past 11,700 years. This age boundary is an absolute age (number of years before present) and is not a radiocarbon (14C) age determination, which requires calibration in order to derive an absolute age. Pre-Holocene faults: Faults that have not moved in the past 11,700 years, thus do not meet the criteria of “Holocene-active fault” as defined in the A -P Act and SMGB regulations. This class of fault may be still capable of surface rupture but is not regulated under the A -P Act. Depending on available site - specific and regional data such as proximity to other active faults, average recurrence, variability in recurrence, the timing of the most recent surface rupturing earthquake, and case studies from other surface rupturing earthquakes, the Project geologist may, but is not required to, recommend setbacks.
Engineered solutions can also be considered by a licensed engineer operating within his or her field of practice.
Age-undetermined faults: Faults where the recency of fault movement has not been determined.
Faults can be “age-undetermined” if the fault in question has simply not been studied in order to deter- mine its recency of movement. Faults can also be age-undetermined due to limitations in the ability to constrain the timing of the recency of faulting. Examples of such faults are instances where datable materials are not present in the geologic record, or where evidence of recency of movement does not exist due to stripping (either by natural or anthropogenic processes) of Holocene-age deposits. Within the framework of the A -P Act, age-undetermined faults within regulatory Earthquake Fault Zones are considered Holocene-active until proved otherwise.
Inactive: A fault may only be presumed to be inactive based on satisfactory geologic evidence; however, the evidence necessary to prove inactivity sometimes is difficult to obtain and locally may not exist.
Although it is difficult to quantify the probability that an earthquake will occur on a specific fault, this classification assumes that if a fault has moved during the Holocene epoch, it is likely to produce earthquakes in the future and is considered an active fault.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-5 ADMINISTRATIVE DRAFT MND/IS
The Project area will be subject to regional ground shaking associated with earthquakes on faults of the San Andreas fault system. Active faults of the San Andreas system are predominantly strike-slip faults accommodating translational movement between the Pacific and North American tectonic plates.
Active and potentially active faults within 50 miles of the approximate center of the proposed Project that are significant potential seismic sources relative to the proposed Project are presented in Table 5.7-1.
Table 5.7-1. Significant Active and Potentially Active Faults within 50 miles of the Proposed Project Fault Name
Distance1
(miles)
Estimated Maximum
Magnitude2,3 Fault Type1
Hayward–Rodgers Creek 5.32 6.8–7.3 Right Lateral Strike Slip, 90◦ dip Monte Vista–Shannon 6.92 6.5 Thrust Fault, dips 45°W
Calaveras 8.82 6.4–7.0 Right Lateral Strike Slip, 90◦ dip San Andreas 11.12 7.1-7.9 Right Lateral Strike Slip, 90◦ dip Zayante-Vergeles 20.7 7.0 Right Lateral Strike Slip, 90◦ dip Greenville Connected 23.9 7.0 Right Lateral Strike Slip, 90◦ dip San Gregorio Connected 24.9 7.5 Right Lateral Strike Slip, 90◦ dip Mount Diablo Thrust 24.6 6.7 Blind Thrust, dips 38° NE
Great Valley 7 33.5 6.9 Blind Thrust, dips 15° W
Monterey Bay–Tularcitos 33.6 7.3 Right Lateral Strike Slip, 90◦ dip Green Valley Connected 35.3 6.8 Right Lateral Strike Slip, 90◦ dip Ortigalita 38.0 7.1 Right Lateral Strike Slip, 90◦ dip
Great Valley 5, Pittsburg Kirby Hills 43.7 6.7 Blind Thrust (reverse), dips 90° Great Valley 8 43.9 6.8 Blind Thrust, dips 15° W
Quien Sabe 45.6 6.6 Right Lateral Strike Slip, 90◦ dip
1 Fault distances and type obtained from the 2008 National Seismic Hazard Maps – Source Parameters website (USGS, 2024b).
Fault distances measured to generalized to the National Seismic Hazard Map (NSHM) fault trace. 2 Fault distance modified using USGS and CGS Quaternary Faults data (USGS and CGS, 2024). 3 Maximum Earthquake Magnitude – the maximum earthquake that appears capable of occurring under the presently known tectonic framework; magnitude listed is “Ellsworth -B” magnitude from USGS 2008 National Seismic Hazard Maps - Source Parameters unless otherwise noted.
4 Range of Magnitude represents varying potential rupture scenarios with single or multiple segments rupturing in various combinations.
Fault Rupture
Fault rupture is the surface displacement that occurs when movement on a fault deep within the earth breaks through to the surface. Fault rupture and displacement almost always follows preexisting faults, which are zones of weakness; however, not all earthquakes result in surface rupture (i.e., earthquakes that occur on blind thrusts do not result in surface fault rupture). Rupture may occur suddenly during an earthquake or slowly in the form of fault creep. In addition to damage caused by ground shaking from an earthquake, fault rupture is damaging to buildings and other structures due to the differential displace- ment and deformation of the ground surface that occurs from the fault offset, leading to damage or collapse of structures across this zone.
While the closest fault to the Project site is the active Hayward fault (part of the Hayward- Rodgers Creek fault zone), no known active or potentially active faults are mapped crossing or immediately adjacent to the Project site (CGS, 2024a). Additionally, the City of Santa Clara is not crossed by any faults zoned under the Alquist-Priolo Earthquake Fault Zoning Act (CGS, 2024a; City of Santa Clara, 2011). There is no risk of surface fault rupture at the Project site.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-6 ADMINISTRATIVE DRAFT MND/IS
Ground Shaking
An earthquake is classified by the amount of energy released, which traditionally has been quantified using the Richter scale. Recently, seismologists have begun using a Moment Magnitude (M) scale because it provides a more accurate measurement of the size of major and great earthquakes. For earthquakes of less than M 7.0, the Moment and Richter Magnitude scales are nearly identical. For earthquake magni - tudes greater than M 7.0, readings on the Moment Magnitude scale are slightly greater than a corre - sponding Richter Magnitude. Numerous moderate and large earthquakes have occurred within 50 miles of the Project site, including 44 earthquakes of M 5.5 or greater, which includes 16 earthquakes of M 6.0 to M 6.9, and one earthquake of greater than M 7.0 (USGS, 20 24c). Catastrophically damaging earth - quakes in the Project area include:
M6.9 1989 Loma Prieta Earthquake – resulted in 63 dead, 3,737 injured, and $6 billion in property damage in the region;
M7.9 1906 San Francisco Earthquake – resulted in 3,000 dead and $524 million in property damage (includes damage from fire); and the
M6.8 1868 Hayward Fault Earthquake – 30 dead and $350,000 in property damage (USGS, 2024c; CGS, 2024b).
The City is located in a region characterized by a moderate to high ground shaking hazard. (City of Santa Clara, 2011). Periodic earthquakes accompanied by surface displacement can be expected to continue in the region.
The intensity of the seismic shaking, or strong ground motion, along the proposed Project route during an earthquake depends on the distance between the Project area and the epicenter of the earthquake, the magnitude of the earthquake, and the geologic conditions underlying and surrounding the Project.
Earthquakes occurring on faults closest to the Project area would most likely generate the largest ground motion. Earthquake damage resulting from ground shaking is determined by several factors: the magni - tude of an earthquake, depth of focus, distance from the fault, intensity and duration of shaking, local groundwater and soil conditions, presence of hillsides, structural design, and the quality of workmanship and materials used in construction. Earthquake shaking hazards are commonly calculated by projecting earthquake rates based on earthquake history and fault slip rates, the same data used for calculating earthquake probabilities. The Probabilistic Seismic Hazard Map (PSHM) for California was used to estimate ground shaking hazards along the proposed Project (CGS, 2016). The PSHM for California shows the relative intensity of ground shaking from intermediate-period (1.0 second) earthquake shaking related to anticipated future earthquakes. Intermediate -period (1.0 second) shaking affects tall, relatively flexible buildings, but also correlates well with overall earthquake damage. The shaking potential is calculated as the level of ground motion that has a 2% chance of being exceeded in 50 years, which is t he same as the level of ground-shaking with a 2 475-year average repeat time. The estimated intermediate -period (1.0 second) ground accelerations for the entire route is 1.15 g, which represents a potential for strong ground shaking (CGS, 2016).
Liquefaction
Liquefaction is the phenomenon in which saturated granular sediments temporarily lose their shear strength during periods of earthquake-induced strong ground shaking. The susceptibility of a site to lique- faction is a function of the depth, density, and water content of the granular sediments and the magnitude and frequency of earthquakes in the region. Saturated, unconsolidated silts, sands, and silty sands within 50 feet of the ground surface are most susceptible to liquefaction. Liquefaction-related phenomena include lateral spreading, ground oscillation, flow failures, loss of bearing strength, subsidence, and buoy- ancy effects (Youd and Perkins, 1978). In addition, densification of the soil resulting in vertical settlement NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-7 ADMINISTRATIVE DRAFT MND/IS
of the ground can occur. To determine liquefaction susceptibility of a region, three major factors are considered: the density and textural characteristics of the alluvial sediments; the intensity and duration of ground shaking; and the depth to groundwater.
The City of Santa Clara is almost entirely within a zone of liquefaction hazard, including the proposed Project area (County of Santa Clara, 2012). Ground failure caused by liquefaction is thus a substantial concern for much of the City’s development. The Project site is within a mapped CGS liquefaction hazard zone (CGS, 2024a). Additionally, the Project area is underlain by potentially liquefiable young alluvial sediments with shallow (less than 10 feet below ground surface) to artesian water levels (water levels that flow to the surface) (CGS, 2001; DWR, 2024).
5.7.1.7. Paleontology
Paleontological resources are the fossilized remains of organisms from prehistoric environments found in geologic strata. These are valued for the information they yield about the history of the earth and its past ecological settings. According to the City of Santa Clara General Plan EIR, the City is situated on alluvial fan deposits of the Holocene age, consisting of gravel, sand and finer sediments. Along the City’s major streams are natural levee deposits consisting of silt and clay, also of the Holocene age. Geologic units of Holocene age are generally not considered sensitive for paleontological resources, because biological remains younger than 10,000 years are not usually considered fossils. Holocene materials in the Santa Clara Valley may have some level of sensitivity for paleontological resources (City of Santa Clara, 2011).
In the Santa Clara Valley, where these Holocene age sediments overlie older, Pleistocene age sediments that have a high potential to contain paleontological resources. The Pleistocene age sediments, often found at depths of 10 feet (3 meters) or more below the ground surface in the region, have yielded the fossil remains of plants and extinct terrestrial Pleistocene vertebrates (City of Santa Clara, 2011).
Pleistocene alluvial sediments may be found at depths of 30 to 35 feet below Holocene alluvium in the Project area (Helley, 1990).
The Project route is underlain by artificial fill over young channel deposited alluvial sediments which have no and low paleontological sensitivity, respectively; the young alluvial sediments are unlikely to have significant fossils due to their age and their high energy m ethod of deposition. The greatest anticipated depth of any excavation along the proposed Project would be approximately 20 to 35 feet (dependent upon pole height) for the 115 kV transmission line tubular steel poles and pole foundations with a typical auger diameter of 8 feet. All other excavations would be at shallower depths.
5.7.1.8. Regulatory Background
Federal
The Clean Water Act. The Clean Water Act establishes the basic structure for regulating discharges of pollutants into the Waters of the U.S. The Act authorized the Public Health Service to prepare com - prehensive programs for eliminating or reducing the pollution of interstate waters and tributaries and improving the sanitary condition of surface and underground waters with the goal of improvements to and conservation of waters for public water supplies, propagation of fish and aquatic life, recreational purposes, and agricultural and industrial uses. The proposed Project construction may disturb a surface area greater than one acre; therefore, SVP would be required to obtain a National Pollution Discharge Elimination System (NPDES) General Permit for Storm W ater Discharges Associated with Construction Activity under Clean Water Act regulations. Compliance with the NPDES would require that the applicant prepare and submit a Storm Water Pollution Prevention Plan (SWPPP).
The International Building Code (IBC). The International Building Code (IBC) is published by the Inter - national Code Council (ICC). The scope of this code covers major aspects of the design and construction NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-8 ADMINISTRATIVE DRAFT MND/IS
and structures and buildings, except for three-story one- and two-family dwellings and town homes. The International Building Code has replaced the Uniform Building Code as the basis for the California Building Code and contains provisions for structural engineering design. The 2018 IBC addresses the design and installation of structures and building systems through requirements that emphasize performance. The IBC includes codes governing structural as well as fire- and life-safety provisions covering seism ic, wind, accessibility, egress, occupancy, and roofs.
State
The California Building Code, Title 24, Part 2 (CBC, 20 23). The California Building Code, Title 24, Part 2 provides building codes and standards for design and construction of structures in California. The 2023 CBC is based on the 2021 International Building Code with the addition of more extensive structural seismic provisions. Chapter 16 of the CBC contains definitions of seismic sources and the procedure used to calculate seismic forces on structures.
The Alquist-Priolo Earthquake Fault Zoning Act of 1972, Public Resources Code (PRC), sections 2621–2630 (formerly the Special Studies Zoning Act). The Alquist-Priolo Earthquake Fault Zoning Act regulates development and construction of buildings intended for human occupancy to avoid the hazard of surface fault rupture. While this Act does not specifically regulate transmission and telecommunication lines; it does help define areas where fault rupture is most likely to occur. This Act groups faults into cate gories of active, potentially active, and inactive faults. Historic and Holocene age faults are considered active, Late Quaternary and Quaternary age faults are considered potentially active, and pre -Quaternary age faults are considered inactive. These cla ssifications are qualified by the conditions that a fault must be shown to be “sufficiently active” and “well defined” by detailed site-specific geologic explorations in order to determine whether building setbacks should be established.
The Seismic Hazards Mapping Act (the Act) of 1990 (Public Resources Code, Chapter 7.8, Division 2, sections 2690–2699). The Act directs the California Department of Conservation, Division of Mines and Geology [now called California Geological Survey (CGS)] to delineate Seismic Hazard Zones. The purpose of the Act is to reduce the threat to public health and safety and to minimize the loss of life and property by identifying and mitigating seismic hazards. Cities, counties, and State agencies are directed to use seismic hazard zone maps developed by CGS in their land-use planning and permitting processes. The Act requires that site -specific geotechnical investigations be performed prior to permitting most urban development projects within seismic hazard zones.
Public Resources Code Section 5097.5. PRC Section 5097.5 provides for the protection of cultural resources.
This PRC section prohibits the removal, destruction, injury, or defacement of archaeological features on any lands under the jurisdiction of State or local authorities.
PRC Section 5097.5 also affirms that no person shall willingly or knowingly excavate, remove, or otherwise destroy a vertebrate paleontological site or paleontological feature without the express permission of the overseeing public land agency. It further states under PRC Section 30244 that any development that would adversely impact paleontological resources shall require reasonable mitigation. These regulations apply to projects located on land owned by or under the jurisdiction of the State or any city, county, district, or other public agency (PRC §5097.5). The importance of paleontological resources is based on their scientific and educational value. The Society of Vertebrate Paleontology identifies vertebrate fossils, their tapho - nomy (fossilization process) and associated environmental data, and fossiliferous deposits as scientifically significant nonrenewable paleontological resources (Society of Vertebrate Paleontology, 2010). Botanical and invertebrate fossils and assemblages may also be significant. Absent specific agency guidelines, most professional paleontologists in California adhere to guidelines set forth in “Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources” (Society of Vertebrate Paleontology, 2010). These categories include high, undetermined, low, and no potential.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-9 ADMINISTRATIVE DRAFT MND/IS
Local
City of Santa Clara General Plan. The purpose of the City’s safety policies is to identify potential hazards and measures that can lessen risks for the City’s population and property (City of Santa Clara, 2014).
Policies in the General Plan related to geologic hazards and paleontologic re sources that apply to the proposed Project are listed below.
Policy 5.10.5 -P7. Implement all recommendations and design solutions identified in project soils reports to reduce potential adverse effects associated with unstable soils or seismic hazards. Policy 5.6.3-P2. Encourage salvage and preservation of scientifically valuable paleontological or archae- ological materials.
Policy 5.6.3-P4. Require that a qualified paleontologist/archaeologist monitor all grading and/or exca - vation if there is a potential to affect archeological or paleontological resources, including sites within 500 feet of natural water courses and in the Old Quad neighborhood. Policy 5.6.3-P5. In the event that archaeological/paleontological resources are discovered, require that work be suspended until the significance of the find and recommended actions are determined by a qualified archaeologist/paleontologist.
5.7.2. Environmental Impacts and Mitigation Measures
(a) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist -Priolo Earth- quake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
N
O IMPACT. No Alquist-Priolo mapped or other known faults cross the proposed Project or are immediately adjacent to it. Therefore, there is no potential for the Project to be damaged by fault rupture and no project activities would result in triggering or directly or indirectly causing primary fault rupture. ii. Strong seismic ground shaking?
LESS THAN SIGNIFICANT. The proposed Project would be in an area mapped as likely to experience strong ground shaking in the event of a large earthquake. The area has historically experienced moderate to severe ground shaking due to the numerous earthquakes that have occurred in the San Francisco Bay Area. These earthquakes have resulted in deaths and injuries and severe damage to property and structures.
Except during construction there would be no full -time onsite workers. The would be no occupied struc- tures as part of the Project. During operations, workers will be onsite periodically for as needed inspections and maintenance. The proposed Project may be subject to strong ground shaking during the Project’s lifetime. While the potential for seismically induced ground shaking in the proposed Project area during Project operation is unavoidable, the transmission line structures would be designed to meet or exceed all applicable local and State seismic design criteria. Design of these structures to all appropriate seismic design criteria reduces the potential for loss, injury, or death of workers or the public to less than significant. iii. Seismic-related ground failure, including liquefaction? L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The proposed Project is within a CGS liquefaction hazard zone and is underlain by potentially liquefiable alluvial sediments and very shallow groundwater.
Therefore, the potential for liquefaction -related damage to the transmission line structures is high. The transmission line structures would be designed to appropriate local and State guidelines. However, to ensure that direct and indirect impacts associated with seismically induced ground failures or liquefaction would be less than significant, mitigation measure MM G -1 (Conduct Geotechnical Investigations for NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-10 ADMINISTRATIVE DRAFT MND/IS
Liquefaction) shall be implemented prior to final Project design to ensure that people or structures are not exposed to hazards from the Project associated with earthquake-induced liquefaction.
Mitigation Measure for Seismically Induced Liquefaction MM G-1 Conduct Geotechnical Investigations. Because seismically induced liquefaction-related ground failure has the potential to damage or destroy Project components, SVP shall cause design-level geotechnical investigation for the Project to be performed that shall include investigations designed t o assess the potential for geologic and seismic hazards, and specifically include evaluation of the potential for liquefaction and expansive soils to affect the 115 kV line structures. Where liquefaction or expansive soils hazards are found to exist/verified, appropriate engineering design and construction measures shall be incorporated into the Project design as deemed appropriate by the Project engineer.
Finalized Project design incorporating geotechnical recommendations shall be submitted to the City 60 days prior to Project construction.
iv. Landslides?
N
O IMPACT. The proposed Project would be located on a flat to relatively flat graded area on the gently sloping Santa Clara Valley floor and no known landslides have occurred in the Project vicinity. The Project route is not located within or near any CGS designated landslide hazard area (CGS, 2024a). Therefore, landslides and other slope failures are highly unlikely to occur and there would be no impact related to landslides or slope instability.
(b) Would the project result in substantial soil erosion or the loss of topsoil? L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The Project route is in a flat to nearly flat urban area and grading would not be required for the proposed project. E xcavation for tubular steel poles and foundations would occur as part of Project construction . Excavation/trenching for duct banks and vaults would occur under Option 2, to construct the underground segment. Surface disturbing activities such as excavation and trenching will be required for construction of the proposed Project but would be done in compliance with regulations pertaining to sediment and runoff control. Best management practices for sediment control would be implemented to manage temporary soil stockpiles . In addition, as noted in Section 5.10 Hydrology and Water Quality, a stormwater pollution prevention plan (SWPPP) or erosion control plan would be required under mitigation measure MM HYD -1 to address surface water quality.
Implementation of this measure would ensure that the potential erosion or loss of topsoil is limited and reduced to a less than significant impact.
Mitigation Measure for Soil Erosion or Loss of Topsoil
MM HYD-1 SWPPP or Erosion Control Plan Development and Implementation. (See full text in Section 5.10, Hydrology and Water Quality.)
(c) Would the project be located on geologic units or soil that is unstable, or that would become unsta- ble as a result of the project, and potentially result in on- or off-site landslide, lateral spread ing, subsidence, liquefaction, or collapse?
LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. As discussed above in Item (a)(iii) regarding liquefac - tion, the proposed Project would be constructed in an area within a zone of liquefaction hazard; therefore, structures could potentially suffer liquefaction-related damage. However, compliance with applicable local and State design regulations and implementation of mitigation measure MM G-1 (Conduct Geotech- nical Investigations) prior to final Project design would ensure that people or structures are not exposed to hazards associated with earthquake-induced liquefaction, reducing the impact to less than significant.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-11 ADMINISTRATIVE DRAFT MND/IS
Additionally, as discussed above in Item (a)(iv) regarding landslides, there would be no impact from landslides as the proposed Project is located on and traverses flat to gently sloping terrain and would not be subject to landslides. Although the Project site is in an area with known historic subsidence, subsidence in the Santa Clara Valley has been controlled/stopped due to activities and procedures put in place by the Santa Clara Valley Water District. The Project will not construct any new groundwater extraction wells and would not contribute to declining water levels and subsidence. Thus, there would be no impact from subsidence.
Mitigation Measure for Seismically Induced Liquefaction MM G-1 Conduct Geotechnical Investigations. (See full text above.) (d) Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. Mapping by the NRCS indicates that the proposed Project is underlain by soil mapped as Urban Land, Urban Land -Hangerone complex, Urban Land–Clear Lake complex, and the Urban Land –Campbell complex es. Urban Land soil s unit have undetermined expansive potential, however the Hagerone, Clear Lake, and Campbell components of the soil complexes underlying the proposed Project have very high expansive potential (NRCS, 2024). Expansive soils could impact the integrity and stability of above and underground structu res, including tubular steel poles and pole foundations, and duct banks and vaults (Option 2), potentially resulting in damage to structures and potentially injuring workers or the public. Compliance with local and State design requirements would reduce po tential impacts from expansive soils. However, to ensure that direct and indirect impacts associated with expansive soils would be less than significant, mitigation mea sure MM G -1 (Conduct Geotechnical Investigations) shall be implemented prior to final Project design to ensure that people or structures are not exposed to hazards from the Project associated with expansive soils.
Mitigation Measure for Expansive Soils
MM G-1 Conduct Geotechnical Investigations. (See full text above.) (e) Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? NO IMPACT. The proposed Project would not include any components requiring septic tanks or alternative wastewater systems. Therefore, there would be no impact. (f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The proposed Project is anticipated to disturb the ground surface for excavation and grading. Geologic units underlying the site consist of undetermined depths of artificial fill, Holocene alluvium, and Pleistocene alluvium. Depth to Pleistocene alluvium a t the site is estimated at 30 to 35 feet below ground surface (Helley, 1990). The Project excavation for the tubular steel pole foundations may exceed these depths in some limited locations , therefore, there is a small chance that Project ground disturba nce for the pole excavations could potentially encounter older Quaternary alluvium (Pleistocene alluvial sediments) near the bottom of the auger holes that may contain unique paleontological resources. The possibility that previously unknown paleontological resources could be discovered and damaged or destroyed during Project ground disturbance would potentially constitute a significant impact absent mitigation. Implementation of mitigation measure MM G-2 would evaluate and protect unanticipated discoveries of unique paleontological resources or unique geologic features, thereby reducing this potential impact to a less than significant level.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.7. GEOLOGY AND SOILS
SEPTEMBER 2024 5.7-12 ADMINISTRATIVE DRAFT MND/IS
Mitigation Measure for Paleontological Resources
MM G-2 Worker Training and Management of Paleontological Resources. A paleontologist must be retained who meets the professional paleontologist qualifications (Society of Verte - brate Paleontology’s Standard Procedures, 2010) and has demonstrated experience in carrying paleontological projects to completion. The qualified professional paleontologist shall prepare a Worker Environmental Awareness Program (WEAP) for potentially encountered paleontological resources, and training shall be provided for all staf f who will be onsite during excavations. The WEAP shall show what local Pleistocene fossils look like in general, where they may appear in the Project, and how to proceed should material suspected to be a fossil is encountered.
The WEAP shall include procedures to follow if paleontological resources are encountered, including:
A monitoring plan for soils generated from tubular pole foundation excavations that may encounter Pleistocene sediments. Workers may temporarily halt operations to allow for identification and collection of paleontological resources from soil spoil piles.
If a potential significant paleontological resource is noted, a qualified paleontologist or paleontological monitor shall be called to the site identify and collect the fossil. A plan for treatment of significant fossils that provides for the treatment of specimens to the point of identification and permanent preservation, including washing of sedi - ments to recover small invertebrates and vertebrates.
A specimen identification, analysis, and curation plan that includes identification to the lowest taxonomic level possible; taxonomic, taphonomic, and biostratigraphic analysis; and curation to the standards of the repository where they will be curated. Paleontological resource collection treatment, and identification shall meet standards set forth in the Society of Vertebrate Paleontology (2010).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.8. GREENHOUSE GAS EMISSIONS
SEPTEMBER 2024 5.8-1 ADMINISTRATIVE DRAFT MND/IS
5.8. Greenhouse Gas Emissions
GREENHOUSE GAS EMISSIONS
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
☐ ☐ ☒ ☐
(b) Conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases?
☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.8.1. Setting
Effects of GHG Emissions. Global climate is altered by the effects of greenhouse gases (GHG) in the atmo- sphere, creating what is commonly known as the “greenhouse effect.” These gasses trap some of the heat radiated from the Earth’s surface, thereby warming the atmosphere. The greenhouse effect is driven mainly by water vapor, aerosols, carbon dioxide (CO 2), methane (CH 4), nitrous oxide (N 2O), and other constituents.
Globally, the presence of GHG affects temperatures, precipitation, sea levels, ocean currents, wind patterns, and storm activity and intensity. The standard definition of anthropogenic GHG emissions of concern includes six primary pollutants: CO 2, CH 4, N 2O, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). The most important and widely occurring anthropogenic GHG is CO2, primarily from the burning of fossil fuels as a source of energy.
Changing temperatures, precipitation, sea levels, ocean currents, wind patterns , and storm activity pro - vide indicators and evidence of the effects of climate change. For 1950 onward, relatively comprehensive data sets of observations are available. Research by California’s Office of Environmental Health Hazard Assessment (OEHHA) reports certain climate chan ge indicators by categorizing the effects as: changes in California’s climate; impacts to physical systems including oceans, lakes, rivers, and snowpack; and impacts to biological systems including humans, vegetation, and wildlife. The primary observed changes in California’s climate include increased annual average air temperatures, more-frequent extremely hot days and nights, and increased severity of drought. Impacts to physical systems affected by warming tempera- tures and changing precipitation patterns show decreasing snowmelt runoff, shrinking glaciers, and rising sea levels. Impacts to terrestrial, marine, and freshwater biological systems, with re sulting changes in habitat, agriculture, and food supply are occurring in conjunction with the potential to impact human well- being (OEHHA, 2018).
GHG Emissions Trends. California first formalized a strategy to achieve GHG reductions in 2008, when California produced approximately 484 million metric tons of CO 2 equivalent (MMTCO2e) according to
the official Air Resources Board inventory. Statewide emissions have been declining in recent years .
California’s sources of GHG emitted approximately 381 MMTCO2e in 2021 (CARB, 2023). Globally, annual average GHG emissions were 56,000 MMTCO2e per year for the decade 2010- 2019 (IPCC, 2022). In this global context, California emits less than one percent of the global anthropogenic GHG.
Regulatory Background
California Global Warming Solutions Act of 2006 [Assembly Bill 32 (AB 32)]. The California Global Warming Solutions Act of 2006 (AB 32) required that California’s greenhouse gas (GHG) emissions be reduced to 1990 levels by 2020. The reduction is being accomplished through an enforceable statewide cap on global warming emissions beginning in 2012. AB 32 directs the ARB to develop regulations and a mandatory reporting system to track and monitor global warming emissions levels (AB 32, Chapter 488, Statutes of NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.8. GREENHOUSE GAS EMISSIONS
SEPTEMBER 2024 5.8-2 ADMINISTRATIVE DRAFT MND/IS
2006). AB 32 requires ARB to update the Scoping Plan at least every 5 years. Accordingly, the ARB released a 2022 Scoping Plan Update in November 2022 (CARB, 2022), which outlines a roadmap to achieve carbon neutrality by 2045.
In passing AB 32, the California Legislature found that:
Global warming poses a serious threat to the economic well -being, public health, natural resources, and the environment of California. The potential adverse impacts of global warming include the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in th e displacement of thousands of coastal businesses and residences, damage to marine eco - systems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problem.
Other major Executive Orders, legislation, and regulations adopted for the purpose of reducing GHG emissions support the implementation of AB 32 and California’s climate goals, as described below.
California Governor’s Executive Order B-30-15 and Senate Bill 32 (SB 32). Executive Order B-30-15 (April 2015) establishes a California greenhouse gas reduction target of 40 percent below 1990 levels by 2030.
One purpose of this interim target is to ensure California meets its target of reducing greenhouse gas emissions to 80 percent below 1990 levels by 2050. This executive order also specifically addresses the need for climate adaptation and directs state agencies to update the California Climate Adaptation Strategy to identify how climate change will affect California infrastructure and industry and what actions the state can take to reduce the risks posed by climate change. Senate Bill 32 (SB 32) of 2016 codifies this GHG emissions target to 40 percent below the 1990 level by 2030.
Clean Energy and Pollution Reduction Act of 2015 [Senate Bill 350 (SB 350)]. California’s state policy objectives on long-term energy planning were updated with SB 350 legislation that was signed into law on October 7, 2015. The requirements include demonstrating through integrated resource planning how each energy service provider, such as SVP, will continue to expand the use of renewable energy supplies in the mix of electricity delivered to end-use customers. With SB 350 California expanded the specific set of objectives to be achieved by 2030, including to increase the Renewable Portfolio Standard (RPS) from 33 percent to 50 percent for the procurement of California’s electricity from renewable sources, and to double the energy efficiency savings in electricity and natural gas end uses by retail customers.
California Governor’s Executive Order B -55-18 and Senate Bill 100 (SB 100). Executive Order B -55-18 establishes a statewide goal for California to achieve carbon neutrality by 2045. In September 2018, Senate Bill 100 (SB 100), revising and extending California’s Renewables Portfolio Standard program, was signed into law. SB 100 accelerated the RPS targets and established the goals of 50 percent renewable energy resources by 2026 and 60 percent renewable energy resources by 2030. These RPS targets are codified according to compliance periods in Pub. Util. Code Section 399.30, as follows: 33 percent by December 31, 2020, 44 percent by December 31, 2024, 52 percent by December 31, 2027, and 60 percent by December 31, 2030. SB 100 also sets a target for California to achieve a GHG-free electricity supply for 100 percent of retail sales of electricity to California end-use customers by December 31, 2045. The 2022 Scoping Plan Update assesses progress towards achieving the updated 2030 targets, while laying out a path to achieve the SB 100 target of carbon neutrality no later than 2045 (CARB, 2022).
Mandatory Reporting of Greenhouse Gas Emissions (17 CCR 95100 to 95158). The ARB Regulation for the Mandatory Reporting of Greenhouse Gas Emissions, or mandatory reporting rule, applies to electric power distribution companies and to fossil fuel electricity generating facilities with a nameplate capacity equal or greater than 1 MW capacity. As an Electric Power Entity under this rule, SVP must report GHG emissions associated with providing electricity to end-use customers.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.8. GREENHOUSE GAS EMISSIONS
SEPTEMBER 2024 5.8-3 ADMINISTRATIVE DRAFT MND/IS
Cap-and-Trade Program (17 CCR 95801 to 96022). The California Cap on Greenhouse Gas Emissions and Market-Based Compliance Mechanisms Regulation (Cap -and-Trade Program) was initially approved by ARB in 2011. The Cap-and-Trade Program applies to covered entities that fall within certain source cate - gories, including first deliverers of electricity (such as fossil fuel power plants) and electrical distribution utilities, such as SVP. The covered entities must hold compliance instruments sufficient to cover the actual GHG emissions, as evidenced through the mandatory reporting rule requirements. This means that SVP, as an electrical distribution utility, bears the GHG compliance obligation for electricity delivered to end - users that are not otherwise covered entities in the Cap-and-Trade Program.
Emission Reductions of SF
6 from Gas Insulated Equipment (17 CCR 95350 to 95359). To reduce GHG emissions from electricity transmission and distribution equipment, ARB adopted a regulation for reducing or phasing-out SF
6 emissions from electric power system gas insulated switchgear. Reporting and inventorying requirements under this regulation apply to equipment, such as circuit breakers and transformers, at existing substations owned and operated by SVP. The proposed Project would not involve any change in SVP’s existing gas insulated equipment covered by this rule.
City of Santa Clara, Climate Action Plan (CAP). The Santa Clara Climate Action Plan updated and adopted on June 7, 2022, aligns the City’s strategies with evolving state and local requirements for climate planning to achieve SB 32 targets for 2030 and carbon neutrality by 2045 (City of Santa Clara, 2022). By building on the prior Climate Action Plan adopted in 2013, the 2022 update accounts for the effects of ongoing state and local actions for reducing GHG identifies additional actions to further reduce GHG and evaluates actions enhance climate resiliency throughout the City . The City’s 2022 CAP envisions a 40 percent reduction in emissions by 2030 (SB 32), with an interim target of an 80 percent reduction in emissions by 2035, as it moves toward a 2045 goal of net carbon neutrality (EO B-55-18) (City of Santa Clara, 2022).
5.8.2. Environmental Impacts and Mitigation Measures
(a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
L
ESS THAN SIGNIFICANT. The proposed construction activities may include mobilizing construction equip- ment, crews , and materials, excavating holes for poles, trenching for underground vault and cable installation, installing concrete foundations and equipment, installing poles, and stringing conductors.
These activities during construction would cause GHG emissions from combustion of fuels used by the construction vehicles and equipment. Diesel and gasoline -powered construction equipment would include trucks for materials and crews, and the following types of equipment: backhoes, loaders, excavators, drill rigs, pumps, welders, pavers, rollers and generators. Equipment and motor vehicles would directly emit CO
2, CH4, and N2O due to fuel use and combustion.
The resulting one- time quantity of GHG emitted during the 14 -month period of construction would be around 641 MTCO2e (Appendix C) for the overhead option, based on use of the California Emissions Estimator Model (CalEEMod; v. 2022.1.1.22). These one-time p roject-level emissions would cease at the conclusion of construction when activities transition to routine O&M. The one -time project -level con- struction emissions would cease at the conclusion of construction and would be well below the threshold level of 10,000 MTCO2e per year for annually recurring emissions from stationary sources (BAAQMD, 2023). Upon completion of construction, operation of the Project would not result in a notable incre- mental increase in GHG emissions from the baseline O&M activities conducted by SVP. The impact associated with GHG emissions would be less than significant. Therefore, the impact associated with GHG emissions would be less than significant.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.8. GREENHOUSE GAS EMISSIONS
SEPTEMBER 2024 5.8-4 ADMINISTRATIVE DRAFT MND/IS
(b) Would the project conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases? LESS THAN SIGNIFICANT. California’s regulatory setting for GHG emissions ensures that most of the existing and foreseeable GHG sources in electric power sector are subject to one or more programs aimed at reducing GHG. The 2022 Scoping Plan Update (ARB, 2022) provides an outline of actions to reduce California’s GHG emissions. The scoping plan requires ARB and other state agencies to adopt regulations and other initiatives to reduce GHGs.
The proposed Project would generate limited quantities of direct GHG emissions from the construction and O&M activities. The mix of sources power delivered to the end-use customers would not change as a result of the proposed Project. The proposed Project would improve the infrastructure used in delivery of SVP’s energy supply and would not affect SVP’s ability to supply renewable energy.
California’s Cap-and-Trade regulation is the major climate program covering Project-related GHG emissions.
Construction and O&M activities would cause GHG emissions due to fuels used by the vehicles and equipment. The end -users of motor vehicle fuels like gasoline and diesel may include construction con- tractors that are not otherwise designated as covered entities in the Cap-and -Trade program, and these do not directly bear the Cap-and-Trade compliance obligation. However, all fuel suppliers must cover the end-user’s GHG emissions. Because the Project -related GHG emissions, including construction -phase emissions and the operational -phase mobile source emissions, would be caused by use of fuels that are “covered” by the fuel suppliers subject to Cap -and-Trade requirements, these emissions would not conflict California’s progress towards achieving GHG reductions.
As it does now, SVP would comply with ARB SF
6 regulations to inventory, report, and minimize SF 6 leaks through the use of new technology. The proposed Project would not add or modify any gas -insulated equipment in SVP’s existing inventory and would not change the use of SF 6 in equipment. The proposed Project would not conflict with any applicable GHG management plan, policy, or regulation. Therefore, this impact would be less than significant.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-1 ADMINISTRATIVE DRAFT MND/IS
5.9. Hazards and Hazardous Materials
HAZARDS AND HAZARDOUS MATERIALS
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? ☐ ☒ ☐ ☐
(b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
☐ ☒ ☐ ☐
(c) Emit hazardous emissions or handle hazardous or acutely haz - ardous materials, substances, or waste within one -quarter mile of an existing or proposed school?
☐ ☐ ☒ ☐
(d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code §65962.5 and, as a result, would it create a significant hazard to the public or the environment?
☐ ☒ ☐ ☐
(e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? ☐ ☐ ☒ ☐
(f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
☐ ☒ ☐ ☐
(g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires? ☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.9.1. Setting
This section addresses issues related to environmental hazards and hazardous materials. Environmental hazards include accidental spills of hazardous materials, the presence of existing subsurface contamina - tion, the risk of wildfire, and aircraft safety. Hazardous materials include fuel, oil, and lubricants. If encountered, contaminated soil can pose a health and safety threat to workers or the public.
5.9.1.1. Existing and Past Land Uses
Existing and past land use activities are commonly used as indicators of sites or areas with the potential for hazardous material storage and use or potential environmental contamination to have occurred. For example, many current and historic industrial sites have contaminated soil or groundwater with haz ard- ous substances. Other hazardous materials sources include leaking underground tanks in commercial and rural areas, contaminated surface runoff from polluted sites, and plumes of contaminated groundwa ter.
The proposed Project area is in an urban area with a mix of residential, commercial, and industrial uses, with residential uses having increased significantly in density since the 1990s.
5.9.1.2. Hazardous Materials
Construction activities routinely involve use and storage of hazardous materials such as cleaning solvents, paints, adhesives, vehicle fuels, oil, hydraulic fluid, and other vehicle and equipment maintenance fluids. The use and storage of such materials must comply with federal, state, and local regulations. Use of hazardous materials during construction of the proposed Project would primarily consist of fluids and fuels for construction equipment and vehicles; limited quantities of cleaning solvents, paints, and adhesives may also be used. Fueling of construction equipment and vehicles would take place in designated areas. Hazardous The use, storage, transport, and disposal of hazardous materials used in construction and operation and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-2 ADMINISTRATIVE DRAFT MND/IS
maintenance of the proposed Project would be carried out in accordance with federal, state, and county regulations. No extremely hazardous substances (i.e., those governed pursuant to Title 40, Part 335 of the Code of Federal Regulations) are anticipated to be produced, used, stored, transported, or disposed of as a result of the proposed Project’s construction.
5.9.1.3. Environmental Contamination
The proposed Project route is in a fully developed urban environment and passes through areas developed as residential, business park, commercial, and light industrial properties. A review of the State Water Resources Control Board (SWRCB) GeoTracker (SWRC B, 2024) and California Department of Toxic Substance Control (DTSC) EnviroStor (DTSC, 2024a) databases revealed there are 37 GeoTracker and five EnviroStor listings for sites with current or past environmental contamination within 0.25 -miles of the proposed Project route. Several listings represent more than one property address/physical site. Of the GeoTracker listings, 10 are Cleanup Program listings and 27 are leaking underground storage tank (LUST) listings (SWRCB, 2024). All 27 of the LUST sites are listed as completed case close d. The EnviroStor sites include two State Response/NPL listings and three Voluntary Agreement cleanup listings. A summary of the GeoTracker Cleanup Program listings and the EnviroStor listings is presented in Table 5.9-1.
Table 5.9-1. Known Environmentally Contaminated Sites within 0.25-mile of the proposed Project Site Name Address
Distance and
Direction from
Alignment
Database
and Status Summary
SWRCB GeoTracker Sites
Shaheen
Property
4767 Lafayette
Street, Santa Clara
130 feet E Cleanup
Program,
Completed –
Case Closed
Petroleum contaminated soil removed
from former gas station and petroleum
groundwater contamination naturally
attenuated – No Further Action Case
Closed issued in 2014
Anderson
Construction
390 Norman Ave,
Santa Clara
675 feet W Cleanup
Program, Open
– Verification
Monitoring
Site overlies shallow volatile organic
compound (VOC) contaminated ground-
water plume from neighboring property –
Soil Vapor Intrusion Mitigation System
installed and ongoing monitoring for new
office building
Andite, Inc. 1440 Norman Ave,
Santa Clara
785 feet W Cleanup
Program, Open
– Site
Assessment
From 1964 to 1985, Anadite owned and
operated a hard anodizing plant at the
Site. Two groundwater plumes are present
at the Site: VOCs and chlorinated aliphatic
hydrocarbons (CAHs). Former source areas
are located at the solvent dip tanks
(northeast of the Site) and the former
chemical storage areas (south of the Site).
Bioaugmentation Pilot Testing conducted
at site in 2004 b- 2005. Assessment,
delineation of plume, and groundwater
monitoring are ongoing.
Pacific
Production
Consulting
600 Laurelwood
Road
1250 feet E Cleanup
Program,
Completed -
Case Closed
Soil and non-potable shallow groundwater
contaminated by chlorinated solvents.
Remedial activities included excavation
and disposal of impacted soil and
groundwater bio injection. Remnant
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-3 ADMINISTRATIVE DRAFT MND/IS
Site Name Address
Distance and
Direction from
Alignment
Database
and Status Summary
contamination below commercial/
industrial use levels remain. Groundwater
plume appears to be naturally attenuating
as of 2014. Site was closed in 2016 with a
DEED Restriction on types of property use
and no groundwater extraction
3060 Raymond
Street
Renovation
3060 Raymond
Street, Santa Clara
670 feet NW
of southern
terminus
Cleanup
Program, Open
– Site
Assessment
Historical industrial uses at and near site.
Subsurface investigations revealed
contaminants of concern in soil, soil vapor,
and groundwater including VOCs,
petroleum products and byproducts, pesti-
cides, heavy metals. Site Management
Plan prepared in 2023 and assessment
monitoring ongoing.
Comstock
Industrial
Properties
795-805 Comstock
St, Santa Clara
505 feet E Cleanup
Program,
Completed-
Case Closed
Contamination from previous industrial
site uses. Low levels of petroleum hydro-
carbons, polynuclear aromatic
hydrocarbons (PAHs) were detected,
pesticides and metals were encountered in
some samples above regulatory levels in
the soil. Low levels of pesticides were
encountered in groundwater, and VOCs
were detected in soil vapor. Residual
contamination remains in on-site soil,
groundwater, and/or soil vapor. Site
closed with restrictions on use and with
required Site Management Requirements.
715 Comstock
Industrial
Property
715 Comstock St,
Santa Clara
950 feet E Cleanup
Program, Open
– Site
Assessment
Industrial site with elevated levels of
naphthalene and petroleum products,
heavy metals, and asbestos in soil and
elevated levels of VOCs in soil vapor. No
contaminants of concern were detected in
groundwater. Site Management Plan
conditionally approved and vapor
monitoring ceased with approval
Sobronto
Development
Co. - Central
Expressway
800 Central
Expressway, Santa
Clara
860 feet SE Cleanup
Program,
Completed-
Case Closed
Former concrete pipe manufacturing site.
Low levels of waste oil and asbestos noted
in soil at site and low levels of VOCs were
detected in groundwater in 1987. No
Further Action was granted to the site in
2005. In 2019 asked for additional infor-
mation and history of the site. Site was
listed as Case Closed-Completed in 2020.
Owens Corning 960 Central
Expressway, Santa
Clara
670 feet S Cleanup
Program, Open
– Verification
Monitoring
Leaks of petroleum USTs in the 1980s
resulted in groundwater contamination at
the site, VOC contamination was also
attributed to upgradient sources.
Petroleum contaminant clean-up order
rescinded in 2001, but VOC monitoring
continued. Low levels of VOC remain in
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-4 ADMINISTRATIVE DRAFT MND/IS
Site Name Address
Distance and
Direction from
Alignment
Database
and Status Summary
groundwater. Several Case Closure
requests have been submitted. Elevated
levels of VOCs encountered in soil vapor;
investigation plan for VOCs in soil vapor
approved in 2023.
DTSC EnviroStor Sites
Gianera 2 –
Habitat for
Humanity
2261 – 2285
Gianera St, Santa
Clara
120 feet S Voluntary
Cleanup –
Certified
Low levels of pesticide below residential
levels detected in soil. Elevated levels of
lead were detected. Impacted soil was
removed from residence yards in 2011 and
was certified as no further remedial action
required
Hogan Drive
Property
Hogan Drive and
Lafayette Street,
Santa Clara
190 feet E Voluntary
Cleanup – No
Further Action
Former dry cleaner site (part of the
Shaheen Property residential subdivision).
Soil, soil vapor, and groundwater testing
detected PCE in shallow groundwater, soil,
and soil vapor in 2007. Excavation of
contaminated soil, bio-remediation of
groundwater, and natural attenuation.
Reduced levels of VOC were detected in
soil vapor and groundwater in 2007. In
2008 DTSC requested a revised human
Health Risk Assessment be prepared.
Agnews State
Hospital
Avenue K and Lick
Road, Santa Clara
1000 feet E State
Response/NPL –
Certified
A major portion of the former Agnews
Developmental Center (ADC) has been
cleaned up under the Department of Toxic
Substances Control (DTSC) oversight.
Potential soil contaminants at the site
were asbestos, contaminated soil, hydro-
carbon solvents, and lead. Little informa-
tion is available. Site listed as certified by
the DTSC in 1985. USTSs and lifts in the
automotive compound removed in 2022
and contaminated soil and groundwater
removed; case closed by SWRCB in 2002.
Former Pycon
Inc Facility
3501 Leanard
Court, Santa Clara
1200 feet W Voluntary
Cleanup -
Clean up of metal impacted soils from
former nickel/copper plating business.
Groundwater did not have elevated cop-
per concentrations at the site. Impacted
soil was removed under the oversight of
the local Agency (SFCD). DTSC reviewed
data on residual copper and nickel in the
soil and concluded no further action
required at the site.
Pittsburgh-Des
Moines Steel
3500 Bassett St,
Santa Clara
450 feet W State
Response/NPL -
Certified
Site was a 31-acre steel fabrication plant
from 1946-1976 and a spray painting
facility from 1976 to 1982. Soil contamina-
tion due not spilled lead-based paint and
leakage from an underground gasoline
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-5 ADMINISTRATIVE DRAFT MND/IS
Site Name Address
Distance and
Direction from
Alignment
Database
and Status Summary
tank. In 1983, 779 cubic yards of contami-
nated soil from different areas on the site
was removed. All soil covering the under-
ground gasoline storage tank was removed
and all spilled gasoline was removed. Resi-
dual soil contamination may be present.
Sources: DTSC, 2024a, and SWRCB, 2024a
The proposed Project is not located on sites identified on a list of hazardous waste and substances sites pursuant to Government Code Section 65962.5, including the Cortese List (DTSC, 2024b), however it is located near several hazardous waste and substances sites included in the SWRCB GeoTracker and DTSC EnviroStor websites (SWRCB, 2024; and DTSC, 2024a)
5.9.1.4. Schools
There are two schools located within 0.25-miles of the proposed Project:
the Kathryn Hughes Elementary School at 4949 Calle De Escuela, 0.19 -miles northeast of the northern terminus (NRS); and
the North Valley Baptist School at 941 Clyde Ave, 0.23-miles east of the proposed Project route.
There are numerous daycare and preschool facilities located within 0.25 -miles of the proposed Project, see Section 5.15, Public Services, for a list of these facilities.
5.9.1.5. Airports and Airstrips
The Norman Y. Mineta San Jose International Airport (Airport) is located approximately 0.5 miles south - east of the southern end of the Project route and the Santa Clara Towers Heliport is located approximately 1 mile west of the route. A review of the Santa Clara County Comprehensive Land Use Plan (CLUP) for the Airport indicates that a large part of the Project route crosses though three Airport’s Safety Zones, is beneath a mapped flight path, portions are with the 70 dB and 75 dB Aircraft Noise Contours, and the entire Project route appears to be within FAR Part 77 Surfaces (SCCALUC, 2024). Federal Aviation Regula- tions (FAR) Part 77, Objects Affecting Navigable Airspace, establishes imaginary surfaces for airports and runways (FAR Part 77 Surfaces) as a means to identify objects that are obstructions to air navigation. Each surface is defined as a slope ratio or at a certain altitude above the airport elevation. The Project route appears to be located within surfaces that range from 112 to 239 feet above Mean Sea Level (MSL) FAR Part 77 Surface zone of maximum structure height, with the lower FAR Part 77 Surfaces (altitudes of 162 to 112 feet MSL from north to south) along the Project route south of Montague Expressway (SCCALUC, 2024). The proposed Project tubular steel poles may range in height from 85 to 1 50 feet above ground surface. Ground elevations along the Project route range from 22 to 36 ft above MSL south of Montague Expressway and from approximately 15 to 22 feet above MSL north of Montague Expressway.
5.9.1.6. Wildfire Hazards
The California Department of Forestry and Fire Protection (CAL FIRE) identifies and maps areas of signifi- cant fire hazards based on fuels, terrain, and other relevant factors. The maps identify this information as a series of Fire Hazard Severity Zones, which are progressively ranked in severity as un- zoned, moderate, high, and very high. Wildland fire protection in California is the responsibility of either the State, local, or federal government. State Responsibility Areas (SRAs) includes those areas where the financial respon- sibility of preventing and suppressing fires falls primarily on the State. Local Responsibility Areas (LRAs) NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-6 ADMINISTRATIVE DRAFT MND/IS
include incorporated cities, unincorporated county areas, cultivated agriculture lands, and portions of the desert. LRA FHSZ are mapped as either Very High Fire Hazard Severity Zones (VHFHSZ), not mapped within VHFHSZ, or if they have been reclassified from an SRAs they are still mapped at moderate, high, and very high FHSZ. LRA fire protection is typically provided by city fire departments, fire protection districts, counties, and by CALFIRE under contract to local governments (OSFM, 2024). Federal Responsibility Areas (FRA) are those located on federal lands not otherwise included in SRAs and LRAs.
The proposed Project would be located within the City of Santa Clara in the County of Santa Clara. The Fire Hazard Severity Zones Map mapping website for LRAs and SRAs (OFSM, 2024b) indicates that the Project site is not in an SRA FHSZ or a LRA VHFHSZ. The proposed Project is located in a fully urbanized developed area with no wildlands at or near the Project site. The Project site is serviced by the Santa Clara Fire Department. For more information on wildfire hazards, see Section 5.20 Wildfire.
5.9.1.7. Regulatory Background
Hazardous substances are defined by federal and State regulations that aim to protect public health and the environment. Hazardous materials have certain chemical, physical, or infectious properties that cause them to be considered hazardous. Hazardous sub stances are defined in the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Section 101(14), and in the California Code of Regulations (CCR), Title 22, Chapter 11, Article 2, Section 66261, which provides the following definition:
A hazardous material is a substance or combination of substances which, because of its quantity, con -centration, or physical, chemical or infectious characteristics, may either (1) cause, or significantly contrib ute to, an increase in mortality or an increase in serious irreversible, or incapacitating reversible, illness; or (2) pose a substantial present or poten- tial hazard to human health or environment when improperly treated, stored, transported or disposed of or otherwise managed.
For this analysis, excavated soil would be considered to be a hazardous waste if it exceeded specific CCR Title 22 criteria or criteria defined in CERCLA or other relevant federal regulations. Remediation (cleanup and safe removal/disposal) of hazardous wastes found at a site is required if excavation of these materials occurs; it may also be required if certain other activities occur. Even if soils or groundwater at a contami - nated site do not have the characteristics required to be defined as hazardous wastes, remediation of the site may be required by regulatory agencies subject to jurisdictional authority. Cleanup requirements are determined on a case-by-case basis by the agency having lead jurisdiction.
Federal
Toxic Substances Control Act, Resource Conservation and Recovery Act, and Hazardous and Solid Waste Act. The federal Toxic Substances Control Act (1976) and the Resource Conservation and Recovery Act of 1976 (RCRA) established a program administered by the U.S. Environmental Protection Agency (U.S. EPA) for the regulation of the generation, transportation, treatment, storage, and disposal of hazardous waste.
RCRA was amended in 1984 by the Hazardous and Solid Waste Act, which affirmed and extended the “cradle to grave” system of regulating hazardous wastes. The use of certain techniques for the disposal of some hazardous wastes was specifically prohibited by the Hazardous and Solid Waste Act.
Comprehensive Environmental Response, Compensation, and Liability Act. Congress enacted the federal CERCLA, including the Superfund program, on December 11, 1980. This law provided broad federal authority to respond directly to releases or threatened releases of hazardous substances that may endanger public health or the envi ronment. CERCLA established requirements concerning closed and abandoned hazardous waste sites; provided for liability of persons respon sible for releases of hazardous waste at these sites; and established a trust fund to provide for cleanup when no responsible party could NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-7 ADMINISTRATIVE DRAFT MND/IS
be identified. CERCLA also enabled the revision of the National Contingency Plan (NCP). The NCP provided the guidelines and procedures needed to respond to releases and threatened releases of hazardous substances, pollutants, and/or contaminants. The NCP also established the National Priorities List. CERCLA was amended by the Superfund Amendments and Reauthorization Act on October 17, 1986.
Clean Water Act. The Clean Water Act (CWA) is the principal federal statute protecting navigable waters and adjoining shorelines from pollution. The law was enacted with the intent of restoring and maintaining the chemical, physical, and biological integrity of the waters of the United States. Since its enactment, the CWA has formed the foundation for regulations detailing specific requirements for pollution prevention and response measures. The U.S. EPA implements provisions of the CWA through a variety of regulations, including the NCP, as described above, and the Oil Pollution and Prevention Regulations. Implementation of the CWA is the responsibility of each state.
National Pollutant Discharge Elimination System. The National Pollutant Discharge Elimination System (NPDES) permit program, created in 1972 by the CWA, helps address water pollution by regulating point sources that discharge pollutants to waters of the United States. The permit provides two levels of control:
technology-based limits and water quality -based limits (if technology-based limits are not sufficient to provide protection of the water body). Under the CWA, U.S. EPA may authorize state, tribal, and territorial governments to administer the NPDES permit program, enabling them to perform many of the permitting, administrative, and enforcement aspects of the NPDES program. In states authorized to implement CWA programs, U.S. EPA retains oversight responsibilities. Within the State of California, the SWRCB issues both general permits and individual permits under the NPDES permit program.
Federal Aviation Administration, 14 CFR Part 77 – Safe, Efficient Use, and Preservation of the Navigable Airspace. Construction of a project could potentially impact aviation activities if a structure or equipment were positioned such that it would be a hazard to navigable airspace. The Federal Aviation Administration (FAA) has established reporting requirements if any construction includes equipment or structures more than 200 feet above ground level or results in an object penetrating an imaginary surface extending out- ward and upward at a ratio of 100 to 1 from a public or military airport runway out to a horizontal distance of 20,000 feet (approximately 3.78 miles). For areas around heliports, this same requirement applies to any construction that is more than 200 feet above ground level or would penetrate an imaginary surface extending outward and upward at a ratio 25 to 1 from a public or military heliport out to a horizontal distance of 5,000 feet.
State
California Environmental Protection Agency. The California Environmental Protection Agency (Cal/EPA) was created in 1991, which unified California’s environmental authority in a single cabinet -level agency and brought the Air Resources Board (ARB), State Water Resources Control Board (SWRCB), Regional Water Quality Control Boards (RWQCBs), Integrated Waste Management Board (IWMB), DTSC, Office of Environmental Health Hazard Assessment (OEHHA), and Department of Pesticide Regulation (DPR) under one agency. These agencies were placed within the Cal/EPA “umbrella” providing for the protection of human health and the environment and to ensure the coordinated deployment of State resources. Their mission is to restore, protect and enhance the environment, to ensure public health, environmental quality, and economic vitality.
California Hazardous Waste Control Law. The California Hazardous Waste Control Law (HWCL) is admin- istered by Cal/EPA to regulate hazardous wastes. The State of California has been granted authorization by the United States EPA to administer all Regulations under both RCRA and the State’s Hazardous Waste Control laws. The HWCL lists 791 chemicals and about 300 common materials that may be hazardous; establishes criteria for identifying, packaging and labeling hazardous wastes; prescribes management con- trols; establishes permit requirements for treatment, storage, disposal and transportation; and identifies some wastes that cannot be disposed of in landfills.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-8 ADMINISTRATIVE DRAFT MND/IS
California Department of Toxic Substance Control. Department of Toxic Substance Control (DTSC) is a department of Cal/EPA and is the primary agency in California that regulates hazardous waste, cleans-up existing contamination, and looks for ways to reduce the hazardous waste produced in California. DTSC regulates hazardous waste in California primarily under the authority of RCRA and the California Health and Safety Code. Other laws that affect hazardous waste are specific to handling, storage, transportation, disposal, treatment, reduction, cleanup, and emergency planning.
California Department of Industrial Relations, Division of Occupational Safety and Health Adminis tra- tion. The California Occupational Safety and Health Administration (Cal/OSHA) is the primary agency responsible for worker safety in the handling and use of chemicals in the workplace. Cal/OSHA standards are generally more stringent than federal regulations. The employer is required to monitor worker expo - sure to listed hazardous substances and notify workers of exposure (8 CCR Sections 337-340). The regula- tions specify requirements for employee training, availability of safety equipment, accident -prevention programs, and hazardous substance exposure warnings.
California Fire Plan. The CAL FIRE Strategic Plan 2024 directs each California Department of Forestry and Fire Protection (CAL FIRE) Unit to prepare a locally specific Fire Management Plan. In compliance with the California Fire Plan, individual CAL FIRE units are required to develop Fire Management Plans for their areas of responsibility. These documents assess the fire situation within each of CAL FIRE’s 21 units and six contract counties. The plans include stakeholder contributions and priorities and identifies strategic areas for pre-fire planning and fuel treatment, as defined by the people who live and work with the local fire problem. The plans are required to be updated annually.
Local
Santa Clara Fire Department Community Risk Reduction Division. Senate Bill 1082 (Health and Safety Code Chapter 6.11) established the Unified Program (a unified hazardous waste and hazardous materials management regulatory program). The Unified Program is implemented at the local level by local govern- ment agencies certified by Cal EPA, which are known as Certified Unified Program Agencies (CUPAs). CUPA agencies implement all the Unified Program elements and serve as a local contact for area businesses.
The CUPA for the Project area is the Santa Clara Fire Department Community Risk Reduction Division (CRRD). As CUPA for City of Santa Clara, the CRRD administers the following California programs:
Hazardous Waste Generator Program – This program applies to businesses and facilities that generate hazardous waste in any quantity, consolidates hazardous waste generated at a remote site, or recycles more than 100 kilograms/month of excluded or exempted recyclable materials. The Santa Clara Fire Department Hazardous Materials Division maintains records and conducts inspections of hazardous waste generators within the City of Santa Clara. Businesses that generate hazardous waste are required to submit a "Hazardous Waste Generator Permit Application" when they move into the city or begin generating hazardous waste. (A properly filled out and submitted Hazardous Waste Materials Business Plan may be used in lieu of the Hazardous Waste Generator Permit Application.) Onsite Hazardous Waste Treatment – The Santa Clara Fire Department Hazardous Materials Division maintains records and conducts inspections of hazardous waste generators who treat wastes on -site in a Fixed Treatment Unit under Permit by Rule, Conditional Authorization, and Conditional Exemption.
The Division currently does not inspect Transportable Treatment Units, full permit facilities, or standardized permit facilities.
Underground Storage Tank (UST) – SCCRRD implements this program to prevent discharges and releases of hazardous substances from USTs. The Santa Clara Fire Department Hazardous Materials Division maintains records of and inspects underground storage tanks. All underground storage tanks are required to meet current state regulations. Permits are required for the installation or removal of underground storage tanks.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-9 ADMINISTRATIVE DRAFT MND/IS
Aboveground Storage Tank SPCC Plan – As the Certified Unified Program Agency (CUPA) for the City of Santa Clara, the Santa Clara Fire Department Hazardous Materials Division is authorized to implement the California Aboveground Petroleum Storage Act. The Santa Clara Fire Department Hazardous Mater- ials Division inspects facilities that store petroleum products in aboveground tanks with a total petrol- eum storage quantity at or above 1,320 gallons for compliance with the Aboveground Petroleum Storage Act and referenced sections of the federal Spill Prevention, Control, and Countermeasure (SPCC) rule. Hazardous Materials Business Plan (HMBP) – Facilities that store any hazardous material at or above the State-defined thresholds, generally 55 gallons of a liquid, 200 cubic feet of a gas, and 500 pounds of a solid, are subject to a HMBP. The CRRD oversees the preparation and submittal of the HMBP. The HMBP must be kept on site in a readily accessible area. The company must also review the HMBP at least once every two years. Copies of the inventory statement, site map, and facility information included in the HMBP must be submitted to the Santa Clara Fire Department annually. California Accidental Release Prevention Program – Businesses that handle more than the State thresh- old quantity of a regulated substance must develop a Risk Management Plan (RMP); an RMP is a detailed engineering analysis of the potential accident factors present at a business and the mitigation measures that can be implemented to reduce this accident potential. The Santa Clara Fire Department Hazardous Materials Division implements the California Accidental Release Prevention Program (CalARP) within the City of Santa Clara. The program requires an assessment of the offsite hazard potential, and the implementation of a program to minimize the risk of release. Companies which are required to prepare a Risk Management Plan for the Environmental Protection Agency pursuant 40 Code of Federal Regulations (CFR), Part 68, are also required to submit a copy of their Risk Management Plan to the Santa Clara Fire Department Hazardous Materials Division.
Santa Clara County Department of Environmental Health (SCCDEH) , Hazardous Materials Compliance Division (HMCD). The SCCEDEH’s HMCD administers the Site Mitigation Program which oversees the Local Oversight Program and the Site Cleanup Program. The Local Oversight Program (LOP) oversees the cleanup of sites con taminated by petroleum from UST releases throughout Santa Clara County. The Site Cleanup Program (SCP) oversees the cleanup of properties contaminated by hazardous materials not exclusively associat ed with petro leum USTs. California Health & Safety Code Sections 101480 through 101490 state that a responsible party for a contaminated site may request local agency oversight of site assessment and remediation activities. In addition, the HMCD administ ers the Hazardous Materials Storage Ordinance (County Ordinance No. NS -517.31) and the Toxic Gas Ordinance (County Ordinance No. NS-517.44).
County of Santa Clara Emergency Operations Plan. In January 2022, the County of Santa Clara adopted an Emergency Oper ations Plan (EOP) to address the planned response of the County of Santa Clara to emergency situations associated with natural disasters and technological incidents, as well as chemical , biological, radiological, nuclear and explosive emergencies. The EOP establishes the emergency organiza- tion, assign tasks, spec ifies policies and general procedures, and provides for coordination of pla nning efforts for emergency events such as earthquake, flooding, dam failure, and hazardous materials responses (OEM, 2022)
City of Santa Clara General Plan. The purpose of the City’s safety policies is to identify potential hazards and measures that can lessen risks for the City’s population and property. The following policies in the General Plan generally relate to the proposed Project (City of Santa Clara, 2014):
Policy 5.10.5 -P22. Regulate development on sites with known or suspected contamination of soil and/or groundwater to ensure that construction workers, the public, future occupants and the envi - ronment are adequately protected.
Policy 5.10.5-P23. Require appropriate clean-up and remediation of contaminated sites.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-10 ADMINISTRATIVE DRAFT MND/IS
Policy 5.10.5-P24. Protect City residents from the risks inherent in the transport, distribution, use and storage of hazardous materials.
Policy 5.10.5-P27. Locate hazardous waste management facilities in areas designated as Heavy Indus- trial on the Land Use Diagram if compatible with surrounding uses and consistent with the County Hazardous Waste Management Plan.
5.9.2. Environmental Impacts and Mitigation Measures
(a) Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED - CONSTRUCTION The use of hazardous materials during Project construction would be minimal. Hazardous materials may include gasoline, diesel fuel, hydraulic oils, equipment coolants, and any generated wastes that may include these materials. These materials are considered hazardous because they are flammable and/or contain toxic compounds, such as volatile organic compounds and heavy metals. Wastes considered hazardous by the State of California would be transported and disposed of according to applicable federal, State, and local regulations, as described above under applicable Regulations. Fueling of construction equipment and vehicles would be performed in designated areas. However, minor spills or releases of hazardous materials could occur due upset or improper handling and/or storage practices during construction activities.
Therefore, implementation of mitigation measure MM H-1 (Hazardous Substance Control and Emergency Response) would reduce potential impacts associated with hazardous material transport, use, and dispo- sal during construction, which would ensure that Project construction would not create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials. Further, SVP would also implement its existing hazardous substance control and emergency response procedures.
Mitigation Measure for Transport, Use, or Disposal of Hazardous Materials MM H-1 Hazardous Substance Control and Emergency Response. SVP shall implement its hazard- ous substance control and emergency response procedures as needed. These procedures identify methods and techniques to minimize the exposure of the public and site workers to potentially hazardous materials during all phases of Project construction through oper- ation. They address worker training appropriate to the site worker’s role in hazardous substance control and emergency response. The procedures also require implementing appropriate control methods and approved containment and spill -control practices for construction and materials stored on site. If it is necessary to store chemicals on site, they shall be managed in accordance with all applicable regulations. Material safety data sheets shall be maintained and kept available on site, as applicable.
All hazardous materials and hazardous wastes shall be handled, stored, and disposed of in accordance with all applicable regulations, by personnel qualified to handle hazardous materials. The hazardous substance control and emergency response procedures include, but are not limited to, the following:
Proper disposal of potentially contaminated soils resulting from leaks or spills. Establishing site-specific buffers for construction vehicles and equipment located near sensitive resources.
Emergency response and reporting procedures to address hazardous material spills.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-11 ADMINISTRATIVE DRAFT MND/IS
Stopping work at that location and contacting the City Fire Department Hazardous Materials Division immediately if visual contamination or chemical odors are detected.
Work will be resumed at this location after any necessary consultation and approval by the Hazardous Materials Division.
SVP shall complete its Emergency Action Plan Form as part of Project tailboard meetings.
The purpose of the form is to gather emergency contact numbers, identify first aid locations and provide other tailboard safety information.
L
ESS THAN SIGNIFICANT – OPERATION AND MAINTENANCE. Other than substances associated with motor vehicles that would be used for inspections and maintenance, no hazardous materials are associated with mainte- nance and operation of the proposed Project. SVP would implement existing operation and maintenance policies to address hazardous materials use after the Project construction is complete. Impacts associated with the transport, use, and disposal of hazardous materials would be less than significant. (b) Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED - CONSTRUCTION. Accidental spills of motor vehicle fluids associated with construction vehicles could occur during construction of the proposed Project as dis - cussed in item (a) above. The minimal amounts of hazardous materials anticipated for use in the Project coupled with implementation of mitigation measure MM HM -1 requirements would reduce potential impacts by requiring the development and implementation of hazardous substance control and health and safety measures.
L
ESS THAN SIGNIFICANT – OPERATION AND MAINTENANCE. No hazardous materials are associated with mainte - nance and operation of the Project except motor vehicle fluids in inspection and maintenance vehicles .
SVP would implement existing operation and maintenance policies to address hazardous materials use after the Project construction is complete.
(c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? L
ESS THAN SIGNIFICANT. Numerous daycare facilities (listed in section 5.15, Public Services), and two schools, the Kathryn Hughes Elementary School and the North Valley Baptist School, would be located within
0.25-mile of the proposed Project route. The proposed Project will not use, store, or transport any acutely hazardous materials and would only use limited quantities of typical construction related hazardous materials such as cleaning solvents, paints, adhesives, vehicle fuels, oil, hydraulic fluid, and other vehicle and equipment maintenance fluids. Refueling of construction equipment and vehicles will take place at a designated site. All hazardous materials would be stored, used, transported, and disposed of in accord- ance with federal, state, and local regulations. Therefore, impacts from projec t-related hazardous materials use during proposed Project construction would be less than significant.
No hazardous materials are associated with maintenance and operation of the Project except motor vehicle fluids in inspection and maintenance vehicles. SVP would implement existing operation and maintenance policies to address hazardous materials use after the Project construction is complete. (d) Would the project be located on a site that is included on a list of hazardous materials sites com - piled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. The proposed Project alignment is not located on hazardous materials sites compiled pursuant to Government Code Section 65962.5, including the Cortese List. However, numerous hazardous material sites are located in the proposed Project vicinity, including NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-12 ADMINISTRATIVE DRAFT MND/IS
many case closed LUST sites, several SWRCB Cleanup Program sites, and DTSC EnviroStor State Response and Voluntary Cleanup sites. Existing and unknown contamination from these sites or other industrial sites in the area may have spread to the proposed Proj ect route due to the shallow groundwater in the Project area. Groundwater in the project vicinity is shallow with water levels of approximately 5 to 13 feet below ground surface (SWRCB, 2024).
Ground disturbing activities for the proposed Project, including excavation/auguring for tubular steel poles and pole foundations, and trenching and excavation for underground installation of ducting and vaults for Option 2, would have the potential to enc ounter known or unidentified environmentally con - taminated soil or groundwater. This would potentially result in exposing workers, the public, and the environment to hazardous materials. Contaminated soil or groundwater encountered during construction and considered to be hazardous by the State of California would be handled, stored, transported , and disposed of according to applicable federal, State, and local regulations, as described above under appli- cable Regulations.
Implementation of mitigation measure MM H -2 (Soil and Groundwater Management) would reduce im - pacts related to encountering known or unidentified soil or groundwater contamination and ensure that proposed Project construction would not result in adverse effects to workers, the public, or the environ- ment through handling, storage, or disposal of contaminated soil or groundwater.
Mitigation Measure for Contaminated Soil and Groundwater MM H-2 Soil and Groundwater Management. Prior to Project construction and ground disturbing activities, SVP shall implement an evaluation of potential soil and groundwater contami- nation at locations along the Project route where excavation, drilling, auguring, or other significant ground disturbance will occur to prevent mobilization of contaminants and exposure of workers and the public. The evaluation shall be completed at least 60 days prior to the start of Project construction. The evaluation of soil a nd groundwater shall include, but not be limited to, the following:
If contaminants below regulatory screening levels are identified, SVP shall coordinate with SCCDEH regarding soil reuse guidelines;
If contaminants exceeding applicable regulatory screening levels for construction workers and residential users published by the RWQCB, DTSC, or the Environmental Protection Agency (EPA) (except for arsenic which is naturally occurring in the area), are encountered during the Soil and Groundwater Characterization Study SVP shall obtain regulatory oversight from SCCDEH and shall prepare a Soil and Groundwater Management Plan (SGMP); and
Soils found in concentrations above established thresholds (except for arsenic) shall be removed and disposed of according to California Hazardous Waste Regulations.
If a SGMP is needed, the SGMP shall be prepared to guide activities during excavation and other ground disturbing activities to ensure that identified contaminated soils or ground- water are handled, removed, and disposed of properly. The SGMP shall be prepared by a licensed qualified professional and submitted to SCCDEH at least 30 days prior to Project construction and shall include, but not be limited to, the following elements:
Procedures and protocols for the safe handling, storage, stockpiling, and disposal of contaminated soils;
Contaminated soil excavated from the site shall be hauled off-site and disposed of at a licensed hazardous materials disposal site;
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-13 ADMINISTRATIVE DRAFT MND/IS
Protocols to manage and disposed of contaminated groundwater that may be encoun- tered during trenching or subsurface excavation activities, and if dewatering is required; and
Procedures and protocols to follow in the event soils or groundwater not previously identified as contaminated and suspected of being contaminated (on the basis of visual, olfactory, or other evidence) are identified during site grading or excavation activities or dewatering activities to allow for proper identification and characterization, and subsequent proper handling, removal, and disposal.
(e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? L
ESS THAN SIGNIFICANT. The Norman Y. Mineta San Jose International Airport (Airport) is located approxi - mately 0.5 miles east of the southern end of the Project route and the Project site is: beneath a mapped flight path; located between the 70 dB and 75 dB Aircraft Noise Contours; located between the 162 and 262 feet above Mean Sea Level FAR Part 77 Surface zone of maximum structure height; and is within the Airport’s Safety Zones (SCCALUC, 2016). The Project would not include on -site staff that would be at increased hazards due aviation hazards and generally the height and form of the proposed project struc- tures would be similar to the existing 115 kV transmission structures located adjacent to roadways throughout the City. However, the heights of the construction equipment and of the tubular steel poles (ranging from 85 to 150 feet in height) may exceed FAR Part 77 Surface zone of maximum structure height altitudes along the southern portion of the Project route. Because of the heights of Project structures, SVP would submit a Notice of Proposed Construction or Alteration to the Federal Aviation Administration (FAA) at least 90 days prior to Project construction. As a result of this consultation, SVP will modify structures as directed by the FAA, which may result in modificati on of the height or location of the structures, or the addition of lighting and marker balls. Compliance with FAA Part 77 regulations would reduce impacts related to aviation hazards to less than significant. (f) Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
L
ESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED. Construction-related temporary short -term lane closures or disruptions may be necessary during the proposed Project’s construction period. Some road closures and/or one-way traffic controls would be required to allow for certain construction activities and to maintain public safety. These closures and controls would temporarily decrease traffic flow in the project area, particularly on Lafayette Street.
In June 2016, the Santa Clara City Council adopted a new comprehensive emergency response plan to replace the prior plan adopted in 2008. The plan provides a legal framework for the management of emergencies and guidance for the conduct of business in the City’s Emergency Operations Center (EOC), including collaboration and coordination between different responsible agencies. The Emergency Opera - tions Plan (EOP) establishes responsibilities and procedures for addressing potential emergencies related to disasters such as earthquakes, flooding, and dam failure; technological incidents; hazardous materials spills or releases; and incidents of domestic terrorism involving weapons of mass destruction, such as Chemical, Biological, Radiological, Nuclear, and Explo sive (CBRNE) devices. The EOP conforms to the requirements of the National Incident Management System (NIMS) mandated by the U.S. Department of Homeland Security. The Santa Clara EOP also builds on and coordinates with the State’s Standardized Emergency Management System (SEMS) and the California State Emergency Plan.
The EOP does not identify specific emergency shelters or evacuation routes in Santa Clara, though schools are identified as preferred facilities for lodging large numbers of people, with churches, hotels, and motels NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.9. HAZARDS AND HAZARDOUS MATERIALS
SEPTEMBER 2024 5.9-14 ADMINISTRATIVE DRAFT MND/IS
also likely to function as mass care facilities during large -scale disasters. The proposed Project would not interfere with operation of any emergency shelters and would not permanently close off or otherwise alter any existing streets, and therefore would not create any obstructions to potential evacuation routes that might be used in the event of an emergency.
During construction, any temporary lane closures would be coordinated with local agencies as specified in Transportation and Traffic Mitigation Measure T-1 (Construction Traffic Control Plan) (see Section 5.16, Traffic and Transportation). Additionally, any temporary road closures would follow applicable regulations and would not impede emergency response. Adherence to the City’s EOP, coupled with implementation of mitigation measure MM T-1 during construction would ensure that the Project would not impair the implementation of, or physically interfere with, an adopted emergency response or evacuation plan; therefore, the impact that would occur related to emergency response during construction would be less than significant.
Mitigation Measure for Interference with an Adopted Emergency Response Plan or Emergency Evacuation Plan
MM T-1 Construction Traffic Control Plan [See Section 5.17.2 (Transportation) for complete text of the mitigation measure.]
(g) Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires?
NO IMPACT – CONSTRUCTION. The proposed Project is in an urban setting with no risk of wildland fire owing to the lack of extensive vegetation in the area. The Project route and surrounding areas are located in an LRA area and are not in mapped VHFHSZ as designated on CAL FIRE wildland fire hazard maps (OSFM, 2024).
LESS THAN SIGNIFICANT– OPERATION AND MAINTENANCE. Operation and maintenance activities would be incorporated into SVP’s existing O&M schedule for the existing transmission lines. As with current opera- tion and maintenance, SVP would comply with all current federal and State laws related to vegetation clearance and fire prevention.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-1 ADMINISTRATIVE DRAFT MND/IS
5.10. Hydrology and Water Quality
HYDROLOGY AND WATER QUALITY
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality? ☐ ☒ ☐ ☐
(b) Substantially decrease groundwater supplies or interfere substan- tially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
☐ ☐ ☒ ☐
(c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i) result in substantial erosion or siltation on- or off-site; ☐ ☐ ☒ ☐ ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite; ☐ ☐ ☒ ☐ iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or ☐ ☐ ☒ ☐
iv) impede or redirect flood flows? ☐ ☐ ☒ ☐
(d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
☐ ☐ ☒ ☐
(e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.10.1. Setting
5.10.1.1. Surface Waters and Drainage
Surface water drainage in the City of Santa Clara is primarily to the Guadalupe River (east of the Project); San Tomas Aquino Creek, also sometimes mapped as the southern extension of Saratoga Creek; (west of the Project); Saratoga Creek (southwest of the Project), and Calabazas Creek (west of the Project) (City of Santa Clara, 2014). The proposed Project route is located approximately equidistantly between San Tomas Aquino Creek to the west and Guadalupe River to the east. The Project site drains to the San Tomas Aquino Creek within the San Jose International Airport-Frontal San Francisco Bay Estuaries Watershed.
Saratoga Creek (and San Tomas Aquino Creek) is listed as an impaired water body by the State Water Resource Control Board (SWRCB) 303 (d) list for diazinon (a pesticide) and trash; the diazinon TMDL listing is from 2007 and is being addressed by the USEPA approved San Francisco Bay Urban Creeks Diazinon TMDL and the trash is being addressed by implementing the trash control provisions of the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries of California (SWRCB, 2018).
All of the streams and rivers crossing the City originate in the Santa Cruz Mountains, which are largely undeveloped. These streams drain northward across Santa Clara Valley to discharge into San Francisco Bay. Within the City, these regionally important streams have been substantially channelized and modi- fied to reduce flood hazards. The City has a storm drainage system that consists of curb inlets that collect and channel surface water, such as rainwater, into a series of storm sewers beneath City’s roadways. The stormwater is transported through the underground pipe to the 4 streams within the City. These streams then directly flow into the San Francisco Bay (City of Santa Clara, 2014).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-2 ADMINISTRATIVE DRAFT MND/IS
5.10.1.2. Groundwater Resources
The Santa Clara Valley is primarily underlain by the Santa Clara Valley groundwater basin, which is divided into three subbasins: the San Mateo Plain, the Niles Cone, and the Santa Clara subbasins. The proposed Project is within the Santa Clara Subbasin (DWR, 2024). The Santa Clara Subbasin is approximately 240 square miles, covering the middle and southern end of the Santa Clara Basin. The water bearing forma - tions of the Santa Clara subbasin include Plio-Pleistocene age Santa Clara Formation of and Pleistocene to Holocene younger alluvium (DWR, 2003). Water production well depths in the Santa Clara Valley average about 278 feet below the ground surface and yield an average of 425 gallons per minute (City of Santa Clara, 2014).
In
contrast to other areas adjacent to San Francisco Bay, where saltwater intrusion has been an issue, total dissolved solids in the groundwater have not been a concern for the City. Nitrates have also not been a problem and are below one
-ha
lf of allowable levels in water extracted from the City’s wells. However, manganese, a naturally occurring metal in groundwater, has been detected at one well, resulting in the City installing a manganese removal system for that well before putting it into production (Ci ty of Santa Clara, 2014). Water quality in the major producing aquifers in the subbasin is generally of a bicarbonate type, with sodium and calcium bicarbonate the principal cations. Although hard, is of good to excellent quality and suitable for most uses (DWR, 2003).
5.10.1.3. Flood Hazard Areas
On Federal Emergency Management Agency (FEMA) flood maps (FEMA, 2009), the Project site is primarily mapped as Zone X - Area with Reduced Flood Risk due to Levee, however, there are some portions of the proposed Project that intersect with areas mapped as Zone X – 0.2% Annual Chance Flood Hazard. The proposed Project would be adjacent to areas that are mapped as Zone AO with a depth of 1 foot, and AH with a base flood elevation of 23 to 32 feet. Special Flood Hazard Zone AO are areas that are river or stream flood hazard areas or areas with a 1% or greater chance of shallow flooding each y ear, usually in the form of a sheet flow, with an average depth ranging from 1 to 3 feet. Zone AH are areas with a 1% annual chance of shallow flooding usually in the form of a pond, with an average depth ranging from 1 to 3 feet (FEMA, 2009).
According to the City’s General Plan from 2014, Figure 5.10-2, the proposed Project is wholly within the Lexington Dam inundation area and is partially within the Anderson Dam inundation area. Some portions of the proposed Project are immediately adjacent to a small Special Flood Hazard Area, as identified above as Zone AH, however the Project site is not vulnerable to sea level rise. The General Plan also states that the City has adopted the Flood Damage Prevention Code, 1987, ed., to address requirements for flood protection (City of Santa Clara 2014).
5.10.1.4. Water Supply
Potable water for the City comes from a combination of sources: City of San Francisco’s Hetch Hetchy aqueduct system, Santa Clara Valley Water District, and groundwater from City -ow
ned wells. Ground -
water comprises almost 70 percent of the City’s water supply. Recycled wastewater is also used in the City for certain landscape irrigation, industrial, and construction purposes (City of Santa Clara, 2014).
Regulatory Background
Federal
Clean Water Act. The Clean Water Act (CWA; 33 U.S.C. Section 1251 et seq.), formerly the Federal Water Pollution Control Act of 1972, was enacted with the intent of restoring and maintaining the chemical, physical, and bio logical integrity of the waters of the United States. The CWA requires states to set standards to protect, main tain, and restore water quality through the regulation of point source and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-3 ADMINISTRATIVE DRAFT MND/IS
certain non -point source discharges to surface water. Those discharges are regulated by the National Pollutant Discharge Elim ination System (NPDES) permit process (CWA Section 402). NPDES permitting authority is delegated to, and admin istered by, Cal ifornia’s nine Regional Water Quality Control Boards (RWQCB). In addition, the State Water Resources Control Board (SWRCB) regulates the NPDES stormwater program. The Proposed Project is under the jurisdiction of the San Francisco Bay Regional Water Qualit y Control Board (Region 2) and the SWRCB.
Projects that disturb one or more acres are required to obtain NPDES coverage under the California General Permit for Discharges of Storm Water Associated with Construction Activity. The Construction General Permit requires the development and implementation of a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP describes Best Management Practices (BMPs) the discharger will use to protect stormwater runoff. The SWPPP must contain a visual monitoring program and a chemical monitoring program for “non-visible” pollutants to be implemented if there is a failure of BMPs.
Section 401 of the CWA requires that any activity, including river or stream crossing during road, pipeline, or transmission line construction, which may result in discharges into a State waterbody, must be certified by the RWQCB through the issuance of a Waste Discharge Requirement. This certification ensures that the proposed activity does not violate State or federal water quality standards. The limits of nontidal waters extend to the Ordinary High Water Mark (OHWM), defined as the line on the shore established by the fluctuation of water and indicated by physical characteristics, such as natural line impressed on the bank, changes in the character of the soil, and presence of debris.
Section 404 of the CWA requires a permit for construction activities involving placement of any kind of fill material into waters of the U.S. or wetlands. The U.S. Army Corps of Engineers (USACE) may issue either individual, site-specific permits or genera l, nationwide permits for discharge into U.S. waters. A Water Quality Certification pursuant to Section 401 of the CWA is required for Section 404 permit actions. If applicable, construction would also require a request for Water Quality Certification (or waiver thereof) from the Central Valley RWQCB and/or the Lahontan RWQCB.
Section 303(d) of the CWA (CWA, 33 USC 1250, et seq., at 1313(d)) requires states to identify impaired waterbodies as those which do not meet water quality standards. States are required to compile this information in a list and submit the list to the USEPA for review and approval. This list is known as the Section 303(d) list of impaired waters. As part of this listing process, states are required to prioritize waters and watersheds for future development of Total Maximum Daily Load (TMDL) requirements. A TMDL is the maximum amount of a pollutant that a particular waterbody can receive while still meeting water quality standards, or an allocation of that water pollutant deemed acceptable to receiving waters. The SWRCB and RWQCBs have ongoing efforts to moni tor and assess water quality, to prepare the Section 303(d) list, and to develop TMDL requirements.
State
Porter-Cologne Water Quality Control Act. The Porter Cologne Water Quality Control Act of 1967, Water Code Section 13000 et seq., requires the SWRCB and the nine RWQCBs to adopt water quality criteria to protect State waters. These criteria include the identification of beneficial uses, narrative and numerical water quality standards, and implementation procedures. The criteria for the Project area are contained in the Water Quality Control Plan (also referred to as a Basin Plan) for the San Francisco RWQCB.
Constraints in the water quality control plans relative to the proposed Project relate primarily to the avoid- ance of altering the sediment discharge rate of surface waters, and the avoidance of introducing toxic pollutants to the water resource. A prima ry focus of water quality control plans is to protect designated beneficial uses of waters. In addition, anyone proposing to discharge waste that could affect the quality of the waters of the state must make a report of the waste discharge to the Regional Water Board or State Water Board as appropriate, in compliance with Porter-Cologne.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-4 ADMINISTRATIVE DRAFT MND/IS
California Water Code Section 13260. California Water Code Section 13260 requires that any person discharging waste, or proposing to discharge waste, within any region that could affect the quality of the waters of the State, other than into a community sewer system, must submit a report of waste discharge to the applicable RWQCB. Any actions related to the proposed Project that would be applicable to Section 13260 would be reported to the San Francisco RWQCB, as applicable.
Local
Safety Policies. The purpose of the City’s safety policies is to identify potential hazards and measures that can lessen risks for the City’s population and property. The following policies in the General Plan generally relate to the proposed Project (City of Santa Clara, 2014):
Policy 5.10.5-P11. Require that new development meet stormwater and water management require - ments in conformance with State and regional regulations. Policy 5.10.5-P13. Require that development complies with the Flood Damage Protection Code. Policy 5.10.5-P14. Coordinate with the Federal Emergency Management Agency to ensure appropriate designation and mapping of floodplains.
Policy 5.10.5-P16. Require new development to implement erosion and sedimentation control mea - sures to maintain an operational drainage system, preserve drainage capacity and protect water quality. Policy 5.10.5-P21. Require that storm drain infrastructure is adequate to serve all new development and is in place prior to occupancy.
Policy 5.10.5 -P22. Regulate development on sites with known or suspected contamination of soil and/or groundwater to ensure that construction workers, the public, future occupants and the envi - ronment are adequately protected.
5.10.2. Environmental Impacts and Mitigation Measures
(a) Would the project violate any water quality standards or waste discharge requirements or other - wise substantially degrade surface or ground water quality? LESS THAN SIGNIFICANT WITH MITIGATION. Disturbance of soil during construction could result in soil erosion and lowered water quality through increased turbidity and sediment transport into the storm drain system. There are no watercourses or other water bodies within or adjacent to the Project. Drainage from the Project is directed to the municipal storm drain system which eventually flows into San Francisco Bay.
The City participates in the regional program for the Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPPP). Santa Clara is committed to improving water quality in the Bay and streams, reducing urban runoff pollution through the implementation of the City’s Urban Runoff Management Plan (URMP). The City’s URMP, along with other local Urban Runoff Management Plans, collectively constitute the regional plan that conforms to the federal requirements of the National Pollution Discharge Elimination System (City of Santa Clara, 2014).
During construction, there is also the potential for violations of water quality standards or waste discharge requirements to occur from accidental leaks, spills, or releases of hazardous or potentially hazardous mate- rials. There also is a potential for violations if existing contamination is encountered during construction.
The proposed Project’s transmission line is approximately 2.24 miles long. Work would also occur at the existing NRS, KRS, and Palm Substation. Laydown or staging areas would also be required for Project mate- rial and equipment. While Option 1 (overhead line) would create less ground disturbance than Option 2 (partial underground line) it is assumed that over 1 acre of disturbance would be required for construction of the line under either option, triggering the need for a SWPPP. Implementation of mitigation measure MM HYD-1 is recommended to ensure that erosion control best management practices (BMPs) would be NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-5 ADMINISTRATIVE DRAFT MND/IS
in place to reduce potential water quality impacts to a less than significant level whether or not a SWPPP is triggered by State law. In addition to mitigation measure MM HYD -1, complying with applicable water quality standards, including obtaining and adh ering to any required water quality permits, would offer sufficient protection to avoid significant adverse impacts to water quality from erosion and sedimenta - tion. Applicable water quality standards and regulations are described above, in Section 5.10.1.
In the event of an accidental spill, adherence to regulatory standards and regulations, as well as imple- mentation of mitigation measure MM HM-1 (Hazardous Substance Control and Emergency Response) (see Section 5.9), would collectively ensure that a suite of BMPs would be applied to minimize the potential for an accidental release of hazardous materials to occur, to quickly and effectively address any such leak, and to quickly and effectively respond to any existing contamination produced or encountered du ring construction. The intent of regulatory standards is to prevent degradation of water quality to the point where beneficial uses would be impaired. Therefore, potential impacts to water quality standards or waste discharge requirements or other substantial degradation of surface or groundwater quality during con - struction would be less than significant with implementation of mitigation measures HYD-1 and HM-1 and compliance with regulatory standards. With these mitigation measures, no violations would be expected from operation of the proposed Project.
Mitigation Measures for Water Quality
MM HYD-1 SWPPP or Erosion Control Plan Development and Implementation. Following Project approval, SVP will prepare and implement a SWPPP, if required by State law, or erosion control plan to minimize construction impacts on surface water and groundwater quality.
Implementation of the SWPPP or erosion control plan will help stabilize graded or disturbed areas and reduce erosion and sedimentation. The plan will designate BMPs that will be adhered to during construction activities. Erosion and sediment control measures, such as straw wattles, covers, and silt fences, may be installed before the onset of winter rains or any anticipated storm events if soils are not stabilized. Suitable stabilization mea- sures will be used to protect exposed areas during constru ction activities, as necessary.
During construction activities measures will be in place to prevent contaminant discharge.
The Project SWPPP or erosion control plan will include erosion control and sediment transport BMPs to be used during construction. BMPs, where applicable, will be designed by using specific criteria from recognized BMP design guidance manuals. Erosion-minimi- zing efforts may include measures such as properly containing stockpiled soils.
Erosion control measures identified will be installed in an area before construction begins during the wet season and before the onset of winter rains or any anticipated storm events.
Temporary measures such as silt fences or wattles, intended to minimize sediment trans- port from temporarily disturbed areas, will remain in place until dis turbed areas have stabilized. The plan will be updated during construction as required by the SWRCB.
A worker education program shall be established for all field personnel prior to initiating fieldwork to provide training in the appropriate application and construction of erosion and sediment control measures contained in the SWPPP. This education program will also discuss appropriate hazardous materials management and spill response. Compliance with these requirements will be ensured by the on-site construction contractor.
MM H-1 Hazardous Substance Control and Emergency Response (see full text in Section 5.9, Hazards and Hazardous Materials)
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-6 ADMINISTRATIVE DRAFT MND/IS
(b) Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
L
ESS THAN SIGNIFICANT. Groundwater supplies could be adversely affected through direct consumption of groundwater resources or indirect depletion of groundwater supplies such as through conducting de- watering activities where the water is not returned to the subsurface. In the case of the proposed Project there would be minimal demand for water.
A water truck may be to support dust suppression during ground disturbing work and for foundation slurry preparation during construction of the drilled concrete pier foundations for the tubular steel poles. These uses would not result in a significant dema nd for water resources from the City, where groundwater makes up 70 percent of the City’s water supply. The existing supply is adequate for use during construction activities. Dewatering may be necessary if groundwater is encountered, but given the depth to the groundwater table, water encountered during project excavation would be shallow and local. The small amount of dewatering would therefore not result in a substantial decrease of the groundwater supply or interfere substantially with groundwater recharge or sustainable groundwater management. Overall, any impacts to groundwater would be less than significant.
(c) Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. result in substantial erosion or siltation on- or off-site; L
ESS THAN SIGNIFICANT. The proposed Project will be built entirely overhead under Option 1, with a possibility of a portion of transmission line being underground under Option 2. The overhead transmission line has no potential to alter the course of a stream or river, nor to substantially alter the existing drainage pattern of the site or area. The proposed Project is in an urban area, which has extensive impervious surfaces, therefore increases in impervious areas and soil compaction would be slight compared to the impervious area of the surrounding urban landscape. The proposed Project would therefore have a less than signi - ficant impact on drainage patterns or runoff generation. ii. substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
L
ESS THAN SIGNIFICANT. As described under Item (c)(i) above, the Project area has extensive impervious surfaces except landscaping. The proposed Project would occur in and adjacent to paved areas and, if underground construction is required, the disturbed area would be restored. This would have a less than significant impact on drainage patterns or runoff generation. The site would drain to the existing storm- water drainage system, similar to existing condition. Impacts on flooding would therefore be less than significant.
iii. create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or L
ESS THAN SIGNIFICANT. As discussed above, the Project will not substantially increase the rate or amount of runoff. Existing or planned stormwater drainage systems would therefore not be adversely affected.
Except as described under Item (a) above, the Project has no features that would generate substantial polluted runoff. This impact would be less than significant. iv. impede or redirect flood flows?
L
ESS THAN SIGNIFICANT. The majority of the proposed Project route is within FEMA Zone X Area with Reduced Flood Risk due to Levee. A small portion of the route intersects Zone X – 0.2% Annual Chance Flood Hazard.
Additionally, the proposed Project is adjacent to a FEMA-designated Special Flood Hazard Areas (Zone AO, NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.10. HYDROLOGY AND WATER QUALITY
SEPTEMBER 2024 5.10-7 ADMINISTRATIVE DRAFT MND/IS
and Zone AH). However, the proposed Project would be installing transmission line poles, which have a very small footprint compared to the width of the floodplain. The proposed Project would not pose a substantial obstruction to flood flows such that flood flows would be impeded or redirected in any substantial way; therefore, the impact would be less than significant. (d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? LESS THAN SIGNIFICANT. The proposed Project site is not subject to the effects of a tsunami and is not near a waterbody that would create seiche effects. The majority of the proposed Project route is within FEMA Zone X Area with Reduced Flood Risk due to Levee. A small portion of the route intersects Zone X – 0.2% Annual Chance Flood Hazard. However, the proposed overhead lines would be well above the level of flooding with no opportunity to release pollutants as a result of flooding. NRS, which are not in the flood- plain, would require minor improvements to accommodate the new circuit. The Project is not in a tsunami or seiche zone. This impact is therefore less than significant. (e) Conflict with or obstruct implementation of a water quality control plan or sustainable ground- water management plan?
LESS THAN SIGNIFICANT. As described in Item (a) above, the Project’s effect on water quality will be less than significant with mitigation. Although the nearby San Tomas Aquino/Saratoga Creek is listed as an impaired water body, there are no features of the Project that would adversely impact the diazinon or trash load of the creek. There are no features of the Project that would otherwise generate water quality impair - ments, nor are there any components of the Project construction or use that could otherwise conflict with the implementation of a water quality control plan. The Project will have minimal water use, mainly during construction, which will be obtained from local water purveyors. There are no features of the Project that would otherwise have any effect on groundwater management. This impact is therefore less than significant.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.11. LAND USE AND PLANNING
SEPTEMBER 2024 5.11-1 ADMINISTRATIVE DRAFT MND/IS
5.11. Land Use and Planning
LAND USE PLANNING
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Physically divide an established community? ☐ ☐ ☒ ☐ (b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.11.1. Setting
The proposed Project would be in an urban, heavily developed area in the City of Santa Clara within Santa Clara County, CA. The northern end of the proposed Project is at the North Receiving Station (NRS) located west of Lafayette Street and south of Bill Wash Way and immediately south of the Levi’s Stadium complex.
The southern end of the proposed Project is at Kifer Receiving Station (KRS) located northwest of the intersection of Lafayette Street and Central Expressway.
Various zoning designations apply to land along the Project alignment, including Heavy Industrial (MH), Light Industrial (ML), Medium Density Multiple Dwelling (R3-25D), Neighborhood Commercial (CN), Planned Development (PD), Single Family (R1-6L), and Planned Development – Master Community (PD-MC). The NRS and KRS sites are zoned as Public or Quasi Public (B) (City of Santa Clara 2023a). “MH” designations permit primary manufacturing, refining and similar activities, warehousing and distri - bution, and data centers. “ML” designations permit a range of light industrial uses, including general service, warehousing, storage, distribution, and manufacturing. “R3-25D” designations permit residential developments with 25 units per gross acre, with a variety of housing types such as low-rise apartments or townhouses. This designation is primarily intended for areas with access to collector streets or in close pro ximity to neighborhood centers. “CN” designations are intended for local-serving retail, personal service, and office uses that meet neighborhood needs, such as supermarkets, stores, medical facilities, restaurants, hair salons, and banks. “R1-6L” designations are designated for single family homes, or very low-density residential uses with detached dwelling units. “B” designations allow a variety of public and quasi-public uses, including government offices, fire and police facilities, transit stations, commercial adult care and childcare centers, religious institutions, schools, cemeteries, hospitals and convalescent care facilities, places of assembly, and other facilities that have a unique public character as their primary use. (City of Santa Clara, 2014) “PD” designations and “PD-MC” designations permit property with a minimum project size of 25 acres, or a master community, and are intended to allow modification of requirements established by other ordi - nances and diversification in the relationship of di fferent uses, while ensuring compliance with the General Plan (City of Santa Clara 2023b).
Regulatory Background
This section includes a description of the land use and planning regulatory framework. There are no federal regulations or policies related to land use and planning applicable to the Project.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.11. LAND USE AND PLANNING
SEPTEMBER 2024 5.11-2 ADMINISTRATIVE DRAFT MND/IS
Local
City of Santa Clara General Plan. The City’s land use policies consider the effects of development on public facilities and infrastructure. The following policy in the General Plan generally relates to the pro posed Project (City of Santa Clara, 2014):
Policy 5.3.1 - P1. Preserve the unique character and identity of neighborhoods through commu nity- in
itiated neighborhood planning and design elements incorporated in new development. Policy 5.3.1- P2. Encourage advance notification and neighborhood meetings to provide an opportunity for early community review of new development proposals. Policy 5.3.1-P10. Provide opportunities for increased landscaping and trees in the community, including requirements for new development to provide street trees and a minimum 2:1 on - or off-s
ite replace-
ment for trees removed as part of the proposal to help increase the urban forest and minimize the heat island effect.
Policy 5.3.1-P11. Allow new public/quasi -public uses under any General Plan Land Use classification, provided that the use is compatible with planned uses on neighboring properties, consistent with other applicable General Plan policies, and has primary access from a Co llector or larger roadway. Such uses not associated with government operations are prohibited in areas designated as Light Industrial or Heavy Industrial, and in areas designated High or Low Intensity Office/Research and Development out- side the Exception Area.
Policy 5.3.1-P15. Require new developments and major public infrastructure projects to include ade - quate rights-of-wa
y to accommodate all modes of transportation.
Policy 5.3.1-P17. Promote economic vitality by maintaining the City’s level of service for public facilities and infrastructure, including affordable utilities and high-quality telecommunications. Policy 5.3.1-P28. Encourage undergrounding of new utility lines and utility equipment throughout the City.
5.11.2. Environmental Impacts and Mitigation Measures
(a) Would the project physically divide an established community? LESS THAN SIGNIFICANT - CONSTRUCTION. The new 115 kV transmission pole structures would primarily follow the edge of roadways, or would be within the median of the road, which includes landscaped planter areas, the perimeters of parking lots, or in sidewalks, where many of the existing power lines in the project vicinity are located. There are residential communities to the east and west of the proposed Project alignment. However, these communities are already physic ally divided by a main arterial road, Lafayette Street, and the railroad lin e, which is parallel to the road. The railroad is fenced or walled along part of the alignment to restrict access. The proposed Project would be constructed along Lafayette Street and parallel to the railroad line and would not be a physical barrier.
During construction work areas for pole installation would typically be within or edge of the road ROW and/or within SVP easements. The work areas would extend approximately 50 feet along the alignment for each individual pole location. The width of the Project encroachment into the public ROW and/or SVPs easement during pole installation and construction stringing will depend on the location of the pole in relation to the curb and private property lines, among other factors.
Construction of both Option 1 (all overhead) and Option 2 (partial underground) would require periodic, temporary lane closures along various public and private roads within the project area to create a safe workspace. Under Option 2, construction would occur over 14 months. Option 2 includes underground construction, which would require a longer construction period for the overall Project and more extensive NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.11. LAND USE AND PLANNING
SEPTEMBER 2024 5.11-3 ADMINISTRATIVE DRAFT MND/IS
and longer duration temporary lane closures. The temporary lane closures would be coordinated with local agencies and SVP would obtain encroachment permits to conduct work in public ROWs in accordance with applicable City requirements.
Given the relatively short construction period and SVP’s coordination with local agencies, there would be a less -than-significant impact to the local established community during construction of the pro posed Project.
N
O IMPACT – OPERATIONS AND MAINTENANCE. During operations and maintenance, most of the proposed Project, except for the poles, would be overhead or underground, and would not divide an established community, therefore, there would be no impact.
(b) Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? N
O IMPACT. The proposed Project would be consistent with the policies of the City General Plan, as listed above in Section 5.11.1, Setting. As discussed in Sections 5.1, Aesthetics, and 5.13, Noise, the project would have less than significant visual and noise impacts. SVP shall obtain all applicable ministerial permits prior to commencing project activities. The proposed Project does not cause an environmental impact due to a conflict with any applicable land use plans, policy, or regulation.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.12. MINERAL RESOURCES
SEPTEMBER 2024 5.12-1 ADMINISTRATIVE DRAFT MND/IS
5.12. Mineral Resources
MINERAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State? ☐ ☐ ☐ ☒
(b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.12.1. Setting
Mineral resources of significance found and extracted in Santa Clara County include construction aggre- gate deposits and salts derived from evaporation ponds at the edge of San Francisco Bay (City of Santa Clara, 2014). A review of California Department of Conservation (CDOC) and U.S. Geological Survey (USGS) data indicate that the proposed Project is in an area identified as MRZ-1, which is an area where there are no known significant mineral resources, and no active mining operations are located in the immediate vicinity of the proposed Project (CDOC, 1996 and 2024a; USGS, 2024). The USGS Mineral Resources Data System identifies one past gravel producer just to the west of the proposed Project (USGS, 2024). The site is currently identified as the CEMEX Concrete Plant located south of Montague Expressway (Google Earth, 2024).
Regulatory Background
This section includes a description of the regulatory framework for mineral resources. There are no federal or local regulations associated with mineral resources that are relevant to the proposed Project.
State
California Surface Mining and Reclamation Act of 1975 (SMARA). SMARA requires that the State Geologist classify land into Mineral Resource Zones (MRZs) according to the known or inferred mineral potential of the land. The California Department of Conservation’s Office of Mine Reclamation (OMR) and the State Mining and Geology Board (SMGB) are jointly charged with administration of the Act’s requirements. The OMR provides technical assistance to lead agencies and operators, maintains a statewide database of mine locations and operational information, and is responsible for matters involving SMARA compliance.
The SMGB promulgates regulations to clarify and interpret SMARA requirements in addition to serving as a policy and appeals board (CDOC, 2024b). The SMGB has the authority to further regulate the authority of the local agencies if it finds that the agencies are not in compliance with the provisions of SMARA.
Mineral resources have been mapped using the California Mineral Land Classification System, which include the following four MRZs:
MRZ-1: Areas where adequate information indicates that no significant mineral deposits are present, or where it is judged that little likelihood exists for their presence; MRZ-2: Areas where adequate information indicates that significant mineral deposits are present, or where it is judged that a high likelihood exists for their presence; MRZ-3: Areas containing mineral deposits, the significance of which cannot be evaluated; and MRZ-4: Areas where available information is inadequate for assignment to any other zone.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.12. MINERAL RESOURCES
SEPTEMBER 2024 5.12-2 ADMINISTRATIVE DRAFT MND/IS
5.12.2. Environmental Impacts and Mitigation Measures
(a) Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State?
NO IMPACT. The proposed Project and the surrounding vicinity are not located within a classified Mineral Resource Zone and there are no known important mineral resources that would be impacted by the Project. Therefore, the Project would not result in the loss of availability of a known mineral resource of value to the region or State.
(b) Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? NO IMPACT. As stated above, there are no designated Mineral Resource Zones in the proposed Project vicinity and there are no known important mineral resources that would be impacted by the Project.
Therefore, the Project would have no impact on any locally important mineral resource recovery sites.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.13. NOISE
SEPTEMBER 2024 5.13-1 ADMINISTRATIVE DRAFT MND/IS
5.13. Noise
NOISE
Would the project result in:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
☐ ☐ ☒ ☐
(b) Generation of excessive groundborne vibration or groundborne noise levels?
☐ ☐ ☒ ☐
(c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the p roject area to excessive noise levels?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.13.1. Setting
Existing Conditions
Community Noise. A measurement scale (A-weighted scale) that simulates human perception is used to describe environmental noise and to assess a project’s impacts on areas that are sensitive to community noise. The A-weighted scale of frequency sensitivity accounts for the sensitivity of the human ear, which is less sensitive to low frequencies, and correlates well with human perceptions of the annoying aspects of noise. The A-weighted decibel scale (dBA) is cited in most noise criteria. Decibels are logarithmic units that can be used to conveniently compare wide ranges of sound intensities.
Community noise levels can be highly variable from day to day as well as between day and night. For simplicity, sound levels are usually best represented by an equivalent level over a given time period (Leq) or by an average level occurring over a 24-hour day-night period (Ldn). The Leq, or equivalent sound level, is a single value (in dBA) for any desired duration, which includes all of the time-varying sound energy in the measurement period, usually one hour. The L50, is the median noise level that is exc eeded fifty per cent of the time during any measuring interval. The Ldn, or day-night average sound level, is equal to the 24 hour A-weighted equivalent sound level with a 10 decibel penalty applied to nighttime sounds occur - ring between 10:00 p.m. and 7:00 a.m. Community Noise Equivalent Level (CNEL) is another metric that is the average equivalent A-weighted sound level during a 24 hour day, obtained after addition of five decibels to sound levels in the evening from 7:00 p.m. to 10:00 p.m. and after addi tion of 10 decibels to sound levels in the night from 10:00 p.m. to 7:00 a.m. To easily estimate the day-night level caused by any noise source emitting steadily and continuously over 24 hours, the Ldn is 6.4 dBA higher than the source’s Leq. For example, if the expected continuous noise level from equipment is 50.0 dBA Leq for every hour, the day-night noise level would be 56.4 dBA Ldn.
Community noise levels are usually closely related to the intensity of human activity. Noise levels are generally considered low when below 45 dBA, moderate in the 45 to 60 dBA range, and high above 60 dBA. In wilderness areas, the Ldn noise levels can be below 35 dBA. In small towns or wooded and lightly used residential areas, the Ldn is more likely to be around 50 or 60 dBA. Levels around 75 dBA are more common in busy urban areas, and levels up to 85 dBA occur near major freeways and airports.
Although people often accept the higher levels associated with very noisy urban residential and residential-commercial zones, they nevertheless are considered to be adverse to public health.
Surrounding land uses dictate what noise levels would be considered acceptable or unacceptable. Lower levels are expected in rural or suburban areas than what would be expected for commercial or industrial NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.13. NOISE
SEPTEMBER 2024 5.13-2 ADMINISTRATIVE DRAFT MND/IS
zones. Nighttime ambient levels in urban environments are about seven decibels lower than the cor re- sponding daytime levels. In rural areas away from roads and other human activity, the day -to-night difference can be considerably less. Areas with full- time human occupation and residency are often con - sidered incompatible with substantial nighttime noise because of the likelihood of disrupting sleep. Noise levels above 45 dBA at night can result in the onset of sleep interference. At 70 dBA, sleep interfere nce effects become considerable (U.S. EPA, 1974).
Noise Environment in the Project Area. The Project area includes land uses that are residential, commer- cial, and industrial. The major arteries, such as Central Expressway and U.S. 101 near the Project, cause traffic noise levels that exceed 75 dBA CNEL along the edges of the roads, and noise levels that exceed 70 dBA CNEL at the Project alignment (City of Santa Clara, 2014; General Plan Figure 5.10 4). The Project is also within a 65 dB CNEL airport noise contour (City of Santa Clara, 2014; General Plan Figure 5.10 5).
Noise Sensitive Areas. Within 0.5 miles of the Project are a diverse range of general plan designations, including areas with medium density residential, low density residential, and community-serving parks/ open space. The only residences in the project vicinity are both east and west of Lafayette Street, primarily in the northern portion of the alignment, and just over 100 feet from the proposed transmission line route at their nearest. Project-related staging areas and work areas would be at least 100 feet from land uses containing sensitive receptors.
5.13.2. Regulatory Background
Regulating environmental noise is generally the responsibility of local governments. The U.S. EPA once published guidelines on recommended maximum noise levels to protect public health and welfare (U.S.
EPA, 1974), and the State of California maintains recommendation s for local jurisdictions in the General Plan Guidelines published by the Governor’s Office of Planning and Research (OPR, 2017). The following summarizes the local requirements.
The City of Santa Clara City Code
The City Code generally prohibits “loud and unreasonable noise” as a nuisance if it may disturb the peace “between the hours of 10:00 P.M. and 7:00 A.M.” including specifically noise that is “made within two hundred fifty (250) feet of any building or place regularly used for sleeping purposes” (Section 9.05.010).
The City’s Noise Ordinance (Chapter 9.10) includes exterior noise limits that must not be exceeded at receiving land uses, for noise generated by any fixed source of noise. Construction activities that occur during allowed hours and noise from City-owned electric facilities are exempt from the noise and vibration standards of the Noise Ordinance (Section 9.10.070). For construction that is “off-street,” which would include project staging areas and substations, and within 300 feet of a residentially zoned p roperty, construction activities shall be limited to occur within the hours of 7:00 A.M. to 6:00 P.M. on weekdays that are not holidays or within the hours of 9:00 A.M. to 6:00 P.M. on Saturdays that are not holidays (Section 9.10.230).
City of Santa Clara General Plan
The Environmental Quality chapter of the General Plan (2014) includes policies to encourage land uses that are compatible with areas of higher noise levels and to protect noise sensitive land uses in areas where existing ambient noise levels are high, as follows:
Policy 5.10.6-P6, D iscourage noise sensitive uses, such as residences, hospitals, schools, libraries and rest homes, from areas with high noise levels, and discourage high noise generating uses from areas adjacent to sensitive uses.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.13. NOISE
SEPTEMBER 2024 5.13-3 ADMINISTRATIVE DRAFT MND/IS
Policy 5.10.6-P7, I mplement measures to reduce interior noise levels and restrict outdoor activities in areas subject to aircraft noise in order to make Office/Research and Development uses compatible with the Norman Y. Mineta International Airport land use restrictions. Policy 5.10.6-P8, C ontinue to encourage safe and compatible land uses within the Norman Y. Mineta International Airport Noise Restriction Area.
5.13.3. Environmental Impacts and Mitigation Measures
(a) Would the project result in generation of a substantial temporary or permanent increase in ambi - ent noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? L
ESS THAN SIGNIFICANT – CONSTRUCTION. The proposed Project would require 14 -months of construction (for Option 1) that include s mobilizing construction equipment, crews, and materials, excavating holes for poles, installing concrete pier foundations, installing poles, and wire stringing. The construction activities would require use of vehicles and heavy-duty equipment capable of generating noise along the proposed transmission line, at the proposed staging and work areas, within the modified substation sites, and along the roadways used to access these locations. The types of construction equipment used at work sites would include trucks for linework, lifts, delivery, concrete, water and work crews, backhoes, loaders, drill rigs, cranes, and small welders, pumps and generators. Outside of work sites, increased traffic noise would be caused by vehicles transporting equipment and supplies to the sites, trucks removing debris, and workers commuting to and from work sites.
Construction would temporarily increase the noise levels within the project area. Noise would vary, as work would occur intermittently at various sites. The surrounding land uses are primarily residential and heavy and light industrial, as well as transportation (arterial and connector roads, railroad). The locations of the proposed transmission line would not be immediately adjacent to any sensitive receptors. However, the area includes a diverse range of general plan designations within 0.5 miles of the p roject, including areas with medium density residential, low density residential, and community-serving parks/open space.
The closest residences in the project vicinity are east of Lafayette Street and approximately 100 feet from the proposed transmission line route. Most residences to the west are behind a high block wall. Project- related staging areas and work areas would be at least 100 feet from land uses containing sensitive receptors.
Construction activities along the project segments and at staging areas would create both intermittent and continuous noises. Intermittent noise would be caused by periodic, short-term equipment operation.
For example, a drill rig would need to be used with a backhoe or loader to create foundations, and this would require one or two days of work at each pole site. Continuous noise would emanate from equip- ment operation over longer periods, such as steady generator or excavator use. The maximum intermit- tent noise levels from a construction work spread would typically range from 84 to 90 dBA at 50 feet. These would be the highest levels expected for foundation development or excavation activities. At 50 feet, continuous noise levels could range up to about 83 dBA. Because sound fades over distance, these levels would diminish over additional distance and could be reduced further by intervening structures. At 100 feet from a work spread, continuous noise levels could range up to 77 dBA and at 200 feet, up to 71 dBA.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.13. NOISE
SEPTEMBER 2024 5.13-4 ADMINISTRATIVE DRAFT MND/IS
Table 5.13 -1 summarizes the typical noise levels
for individual pieces of construction equipment.
Construction would also cause noise away from
work areas, primarily from commuting workers and
from trucks needed to bring materials to the sites.
This would be similar to vehicle and truck traffic
already present in the area. Haul trucks would make
trips to bring poles, conductor line, and other
materials to the con struction sites and remove
excavated soil and debris. The noise levels asso-
ciated with passing trucks and commuting worker
vehicles would be approximately 71 to 76 dBA at 50
feet, and would be concentrated along the major
arterial streets and smaller streets and access roads
leading to individual work areas.
Construction noise would affect the locations
closest to the work and staging areas and along site access routes used by haul trucks and other construction traffic. The surrounding land uses would experience a temporary increase in noise above the conditions that exist without the Project. Construction noise would occur in a setting of industrial land uses and moderate ambient noise levels without the Project. However, the intermittent and variable nature of construction noise limits the potential for adverse effects such as annoyance to be experienced by off-site receptors, and sleep interference would not be a concern because residences in the project area are set back from the alignment and most construction activities would occur during daylight hours.
Incremental noise from construction vehicles and traffic noise would not represent a substantial increase in the context of the project surroundings of industrial land uses and the existing noise levels.
SVP would take routine precautions to avoid creating unnecessary noise, especially near residential or other sensitive land uses. Construction traffic would be routed away from residential areas, when possi - ble. The construction noise levels would be compa tible with existing land uses and ambient noise levels and would pose no conflict with City policies regarding compatibility of land uses with noise levels. Project construction noise during daytime hours would be exempt from the standards established in C ity Noise Ordinance. The construction noise impact under this criterion would be less than significant.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. City -owned electric facilities are exempt from the noise and vibration standards of the Noise Ordinance (Chapter 9.10.070). Upon completing construction, occasional maintenance of the Project would not result noise levels in excess of standards established in the local general plan or noise ordinance. Permanent increases in ambient noise levels in the project vicinity would not occur, and the transmission and distribution system improvements would not generate a new or different source of permanent noise. Operation and maintenance activities would be comparable to O&M of the SVP’s existing facilities. Corona and audible noise from the corona effect typically becomes a design concern for transmission lines at 230 kV and higher and is less noticeable or inaudible on lines operated at lower voltages such as the proposed 115 kV transmission line. This impact would be less than significant.
(b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels generation of excessive groundborne vibration or groundborne noise levels? LESS THAN SIGNIFICANT. Groundborne vibration from construction equipment and activities might be perceptible to receptors in the immediate vicinity of work or staging areas. The activity that would be most likely to cause groundborne vibration would be the passing of heavy trucks on uneven surfaces. The impact from construction
-rel
ated groundborne vibration would be short -ter
m and confined to only the
Table 5.13-1. Typical Noise Levels for Individual
Construction Equipment
Equipment
Typical Lmax
(dBA, at 50 ft)
Typical Leq
(dBA, at 50 ft)
Drill rig, auger 84 77
Crane 81 73
Backhoe 78 74
Excavator 81 77
Compactor 83 76
Dump truck, haul truck,
concrete mixer truck
76-79 73-76
Pickup truck, crew truck 75 62-71
Source: FHWA, 2006.
Lmax: Maximum noise level from Actual Measured in Roadway Construction Noise Model.
Leq: Equivalent noise level for one hour incorporating the Acoustical Usage Factor.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.13. NOISE
SEPTEMBER 2024 5.13-5 ADMINISTRATIVE DRAFT MND/IS
immediate area around such activities (within about 25 feet). Pole locations and work sites, including the work within the existing substations, would be more than 25 feet from residences, so no homes would be exposed to excessive vibration, and the impact during construction would be less than significant.
Equipment associated with operation and maintenance of the Project would not produce any ground - borne noise or vibration; therefore, operation and maintenance of the project would result in no impact under this criterion.
(c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? NO IMPACT. The proposed Project would be located adjacent to Levi Stadium and Lafayette Street and would cross Highway 101 and the Montague Expressway. The proposed Project would be unstaffed and would not create inhabited structures or workspaces. Therefore, the Project would not expose people to noise from the airport. Similarly, no excessive noise would result from Project operations that could impact people residing or working near the airport. There are no private airstrips located within two miles of the proje ct, therefore the project would have no impact under this criterion. As such, the proposed Project would not expose people to excessive noise from aircraft, and there would be no impact.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.14. POPULATION AND HOUSING
SEPTEMBER 2024 5.14-1 ADMINISTRATIVE DRAFT MND/IS
5.14. Population and Housing
POPULATION AND HOUSING
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
☐ ☐ ☒ ☐
(b) Displace substantial numbers of existing people or housing, neces- sitating the construction of replacement housing elsewhere? ☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.14.1. Setting
The northern approximately 0.74 mile of the proposed Project is adjacent to areas zoned for residential uses of varying densities. The remainder of the proposed Project is adjacent to areas zoned for offices, businesses, and industrial uses (City of Santa Clara 2023).
Overall, this area of the City is substantially built out. Substantial increases in population can be achieved only by development of higher density housing, either on vacant land or through redevelopment of existing land uses.
Table 5.14-1 provides existing conditions for population housing, and employment for the City and the County of Santa Clara.
Table 5.14-1. Year 2017 Existing Conditions – Population, Housing, and Employment: City of Santa Clara and County of Santa Clara
Housing Units Employment
Location Population
Total
Units
Vacancy
Rate
Total
Employed*
Unemployment
Rate
City of Santa Clara 132,476 53,370 6.4% 70,400 3.3%
County Santa Clara 1,886,079 701,539 5.0% 1,002,600 3.5% *Accounts for population greater than 16 years of age and in Labor Force.
Source: CA DOF, 2023; CA EDD, 2023
Regulatory Background
This section includes a description of the population and housing regulatory framework. There are no federal or state regulations, plans, and standards for population and housing that apply to the proposed project.
City of Santa Clara General Plan
The purpose of the City’s housing policies is to plan for an adequate variety of safe, appropriate, and well- built housing for all residents of Santa Clara (City of Santa Clara, 2014b). The following policies from the City General Plan and the Housing Element of the General Plan, respectively, generally relate to the proposed project (City of Santa Clara, 2014a; City of Santa Clara, 2014b):
Policy 5.3.1-P5. Implement a range of development densities and intensities within General Plan land use classification requirements to provide diversity, use land efficiently and meet population and employment growth.
Policy D-4: Encourage early participation from residents and other stakeholders in development of long-range plans and review of new development proposals.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.14. POPULATION AND HOUSING
SEPTEMBER 2024 5.14-2 ADMINISTRATIVE DRAFT MND/IS
5.14.2. Environmental Impacts and Mitigation Measures
(a) Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
L
ESS THAN SIGNIFICANT. The proposed project is in a substantially developed urban area. There would be no direct population growth induced by the Project, as it would not provide new housing and would not require an expansion of the SVP workforce to service and maintain the new transmission facilities. During the 14-month construction period (for Option 1), the proposed Project would provide short-term jobs for a small workforce. Construction needs are not anticipated to result in workers relocating to the area. The proposed Pr oject would therefore generate neither a permanent increase in population levels nor a decrease in available housing.
The construction and operation of the new 115 kV transmission line and reconfiguring of the electric load would facilitate future planned growth by ensuring reliable electricity to the area and would therefore result in an indirect effect of facilitating the development of the surrounding area of the City of Santa Clara. Greater electrical reliability would provide developmental and employment opportunities to the regional workforce. While the further development of this area of the City may induce some population growth, this has already been accounted for through the City’s General Plan. Therefore, there would be a less than significant effect as a result of the proposed Project. (b) Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
N
O IMPACT. The proposed Project would not be expected to result in an increase in population within the area. Construction of the new 115 kV transmission line would occur over approximately 14-months (for Option 1) and would not require the relocation of workers to the proposed Project area in the City. The proposed Project would not displace any housing or people, and therefore would not necessitate the construction of replacement housing. Therefore, no impacts would occur.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.15. PUBLIC SERVICES
SEPTEMBER 2024 5.15-1 ADMINISTRATIVE DRAFT MND/IS
5.15. Public Services
PUBLIC SERVICES
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered govern- mental facilities, need for new or physically altered governmental facilities, the con struction of which could cause significant envi - ronmental impacts, in order to maintain acceptable service ratios, response times, or other per formance objectives for any of the public services:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Fire protection? ☐ ☐ ☒ ☐
(b) Police protection? ☐ ☐ ☒ ☐
(c) Schools? ☐ ☐ ☐ ☒
(d) Parks? ☐ ☐ ☐ ☒
(e) Other public facilities? ☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.15.1. Setting
For the area where the proposed Project would be located, public services, including fire and police services, as well as schools, parks and recreational areas, and other public services, are provided by the City of Santa Clara, special districts, and private entities.
5.15.1.1. Fire Protection
The Santa Clara Fire Department (SCFD) serves the City and provides fire protection and emergency services to the project site and the surrounding area (City of Santa Clara, 2014a). There are 10 fire stations throughout the City and each fire station has a t least one 3 -pe
rson engine or ladder-truck company (City
of Santa Clara, 2014a). The nearest fire stations to the proposed Project route are Fire Station 8 at 2400 Agnew Road, about 0.6 miles west of Lafayette Street, Fire Station 6 at 888 Agnew Road, abo ut 0.5 miles west of Lafayette Street, and Fire Station 2 at 1900 Walsh Avenue about 0.8 mile from Kifer Receiving Station (KRS), which is the southernmost part of the proposed Project route (City of Santa Clara, 2024c).
The average response time is 3 minutes for all areas of the City (City of Santa Clara, 2014a).
5.15.1.2. Police Protection
The Santa Clara Police Department (SCPD) serves the City and provides police protection to the project site and the surrounding area (City of Santa Clara, 2014a). The police station at 3992 Rivermark Parkway is approximately 0.7 miles east of Lafayette Str eet. SCPD headquarters is located at 601 El Camino Real, about 1.7 miles from Kifer Receiving Station, which is the southernmost part of the proposed Project route. SCPD has 232 full- time employees, including 153 sworn officers and 79 civilians. The averag e response time from dispatch to first officer arrival is 2 minutes and 35 seconds (City of Santa Clara, 2024d).
5.15.1.3. Schools and Daycare
Six school districts serve the City: Santa Clara Unified School District, San José Unified School District, Cupertino Union School District, Fremont Union High School District, Campbell Union School District, and Campbell Union High School District. The Santa Clara Unified School District is the only school district that operates schools within the City (City of Santa Clara, 2014a). Numerous daycare facilities operate in the NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.15. PUBLIC SERVICES
SEPTEMBER 2024 5.15-2 ADMINISTRATIVE DRAFT MND/IS
City, often in private homes. Educational institutions and known daycare facilities within 0.25-miles of the proposed Project include:
Kathryn Hughes Elementary School, 4949 Calle De Escuela North Valley Baptist Schools; 941 Clyde Ave
Montague District Preschool, 750 Laurie Ave
Anna’s Daycare, 4639 Snead Dr
Care A Lot Family Daycare, 2056 Fairway Glen Dr
Marvelous Kids Daycare, 4646 Armour Dr
Hackett Daycare, 4493 Cheeney St
Patty’s Loving Care, 2347 Remo Ct
iGurukul Learning Center, 2067 Agnew Rd
Little Dolphin Family Daycare, 2376 Silveria Ct
Matangi Family Daycare, 901 Clyde Ave
Santa Clara Joy Family Day Care, 849 Leith Ave
Agape Playskool, 3700 Thomas Rd
Little Glitters Daycare, 1038 Leith Ave
Kool School Daycare, 983 Laurie Ave
Martinson Child Development, 1350 Hope Dr
Hughes Preschool, 4949 Calle De Escuela
Mater Ecclesiae Academy, 968 Leith Ave
5.15.1.4. Parks
There are 40 parks in the City (City of Santa Clara 2024a). The parks nearest to the proposed Project are Lick Mill Park, a small part of which fronts on Lafayette Street near the Northern Receiving Station, and the Agnews Historic Park, located directly adjacent to the proposed Project at 4030 Lafayette Street (City of Santa Clara, 2024b). See Section 5.16, Recreation for a list of parks in the vicinity of the proposed Project.
5.15.1.5. Hospitals
The hospitals closest to the proposed Project are:
O’Connor Hospital, 2105 Forest Avenue, San Jose, 3.4 miles south of KRS Valley Health Center Sunnyvale, 660 S Fair Oaks Avenue, Sunnyvale, 4 miles west of KRS Kaiser Permanente Santa Clara Medical Center, 700 Lawrence Expressway, 3.8 miles southwest of KRS The City’s 2010-2035 General Plan Integrated Final EIR identified seven roads as key routes in the City for emergency vehicles. Out of the seven routes only one, Montague Expressway, would be crossed by the proposed Project (City of Santa Clara 2011).
Regulatory Background
This section includes a description of the public services regulatory framework. There are no federal regulations associated with public services that are relevant to the proposed project.
State
2010 Strategic Fire Plan for California. The 2010 Strategic Fire Plan for California was developed in coor - dination with the State Board of Forestry and Fire Protection and CAL FIRE to reduce and prevent the impacts of fire in California. Goal 6 of the Plan sets objectives to determine the level of suppression resources (staffing and equipment) needed to protect private and public state resources. Specific objectives include, but are not limited to, maintaining an initial attack policy which prioritizes life, property, and natural NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.15. PUBLIC SERVICES
SEPTEMBER 2024 5.15-3 ADMINISTRATIVE DRAFT MND/IS
resources; determining suppression resources allocation criteria; analyzing appropriate staffing levels and equipment needs in relation to the current and future conditions; increasing the number of CAL FIRE crews for fighting wildfires and other emergency response activities; maintaining cooperative agreements with local, state, and federal partners; and implementing new technologies to improve firefighter safety, where available (State Board of Forestry and Fire Protection). The standards outlined are applicable to the fire protection agency serving the City.
Local
City of Santa Clara General Plan. The purpose of the City’s public services policies is to maintain the safety and security that is essential and integral to the quality of life in the City’s community. The following policy in the General Plan generally relate to the proposed project (City of Santa Clara, 2014):
Policy 5.9.3-P1 . Encourage design techniques that promote public and property safety in new develop- ment and public spaces.
5.15.2. Environmental Impacts and Mitigation Measures
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain accept- able service ratios, response times, or other performance objectives for any of the public services:
(a) Fire protection?
L
ESS THAN SIGNIFICANT. The construction of the new 115 kV transmission line would result in fire risk that would be comparable to that of the transmission line that is being replaced and other existing electrical infrastructure in the area. The proposed Project area would continue to be adequately supported by the existing fire protection services since the construction and operation of the proposed Project would not induce growth in the project area and the fire risk from the proposed Project would not create the need for new or physically altered fire protection facilities. In addition, operation and maintenance would not affect the ability of fire personnel to respond to fires. Only one emergency access route, Montague Expressway, would be crossed by the proposed Project. No construction-related activities would be located on streets identified as major emergency access routes. Therefore, the proposed Project is not expected to significantly interfere with emergency response. Impacts on local or regional fire protection would be less than significant.
(b) Police Protection?
L
ESS THAN SIGNIFICANT. The proposed Project would not require police services during construction or opera- tion and maintenance beyond routine patrols and response. As with fire services discussed in Item (a) above, the construction and operation of the proposed project would not induce growth in the project area, would not result in a need for additional police facilities or affect response times or other service performance. Only one emergency access route, Montague Expressway, would be crossed by the proposed Project. No construction -related activities would be located on streets identified as major emergency access routes. Therefore, the proposed Project is not expected to significantly interfere with emergency response. The result would be a less than significant impact. (c) Schools?
N
O IMPACT. The proposed Project would not be expected to result in an increase in population within the area. Construction of the new 115 kV transmission line would occur over approximately 14 months and would not require the relocation of workers’ families to the City of Santa Clara. There would not be an expected increase in families or in school-age children as a result of the temporary construction activities and any workers who might temporarily migrate to the area. After construction, SVP’s existing maintenance NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.15. PUBLIC SERVICES
SEPTEMBER 2024 5.15-4 ADMINISTRATIVE DRAFT MND/IS
and operations group would assume inspection, patrol, and maintenance duties as needed; therefore, no additional staff would be required after project construction work is completed. The proposed Project would result in no impact related to requiring expanded schools. (d) Parks?
N
O IMPACT. The proposed Project would not increase the region’s population. Construction of the new 115 kV transmission line would take place over 14 months (for Option 1) and would require only a small workforce of construction personnel working on any given day. While it is possible that workers traveling to the area may use existing public services or amenities such as parks, the potential increase in use and demand would be minimal and temporary and would not contribute substantially to the physical deterioration of existing facilities. Consequently, the Project would not increase any long -term demands on existing parks in the project area, and no new or expanded park facilities would be required because of the proposed Project.
(e) Other Public Facilities?
N
O IMPACT. The proposed Project would not increase population and would not affect other governmental services or public facilities that would lead to the requirement of new or expanded facilities to be developed. Therefore, no impact on other public facilities is expected.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.16. RECREATION
SEPTEMBER 2024 5.16-1 ADMINISTRATIVE DRAFT MND/IS
5.16. Recreation
RECREATION Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accel - erated?
☐ ☐ ☐ ☒
(b) Does the project include recreational facilities or require the con - struction or expansion of recreational facilities, which might have an adverse physical effect on the environment?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.16.1. Setting
There are 40 parks in the City of Santa Clara (City of Santa Clara, 2024a). In general, each 1-squ are mile of residential area in the City contains a neighborhood or community park located close to the center to ensure that almost all residents live within a 10-minute walk of a park (City of Santa Clara, 2014a).
The
two parks nearest to the proposed Project are Lick Mill Park, a small part of which fronts on Lafayette Street near the Northern Receiving Station, and the Agnews Historic Park, located at 4030 Lafayette Street (City of Santa Clara, 2024a). The portion of Lick Mill Park at Lafayette Street is a 75-foot-wide greenway that extends east 0.3 miles along Fairway Glen Drive to the main park facilities. The Agnews Historic Park is 14.5 acres and is located on a Historic Easement on the Oracle Santa Clara campus property, which was the site of the former Agnews State Hospital. The park includes four historic buildings which are preserved as part of the historic easement (City of Santa Clara, 2024b).
There are several parks within 0.5 miles of the proposed Project, including: Agnew Park (approximately
0.22 mile west); Fuller Street Park (approximately 0.2 mile west); Santa Clara Youth Soccer Park (approxi- mately 0.2 mile northwest); Fairway Glen Park (approximately 0.18 mile northeast); Lick Mill Park (approximately 0.3 mile east); and Montague Park (approximately 0.38 mile east). The Ulistac Natural Area is located approximately 0.5 mile east of the proposed Project and consists of 40 acres of open space with no facilities. All these parks, except the greenway strip from Lick Mill Park and Agnews Historic Park, fronting on Lafayette Street, are separated from the proposed Project development. Other recreational facilities in the City include sports fields, a skate park, swimming pools/centers, senior center and youth center (City of Santa Clara, 2024a), but none of these area in the vicinity of the proposed project.
Regulatory Background
This section includes a description of the recreation regulatory framework. There are no federal or State regulations associated with recreation that are relevant to the proposed project.
City of Santa Clara General Plan. The objective of the City’s public facilities and services policies is to maintain a high quality of life and livability in the City. The following policies in the General Plan generally relate to the proposed project (City of Santa Clara, 2014a):
Policy 5.3.5-P3. Encourage industrial development to participate in the identification and funding of 25 acres for park and recreational facilities to serve employment centers north of the Caltrain railroad tracks.
Policy 5.9.1-P16. Encourage non-r esidential development to contribute toward new park facilities to serve the needs of their employees.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.16. RECREATION
SEPTEMBER 2024 5.16-2 ADMINISTRATIVE DRAFT MND/IS
5.16.2. Environmental Impacts and Mitigation Measures
(a) Would the project increase the use of existing neighborhood and regional parks or other recrea- tional facilities such that substantial physical deterioration of the facility would occur or be accelerated?
NO IMPACT. The Project does not include development of new residential areas or commercial facilities that would increase population and, therefore, would not increase the demand for parks in the Project area. Construction of the new 115 kV transmission line would take place over approximately 14 months (for Option 1) and would require only a small workforce working on any given day. While some workers may use nearby park facilities during Project construction, increased use would be minimal and temporary and would not contribute substantially to the physical deterioration of existing facilities. Therefore, there would be no impact.
(b) Does the project include recreational facilities or require the construction or expansion of rec rea- tional facilities, which might have an adverse physical effect on the environment? N
O IMPACT. The proposed Project does not include recreational facilities, nor does it require the construc- tion of new or expanded parks or recreational facilities that could create an adverse physical effect on the environment. There would be no impact.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-1 ADMINISTRATIVE DRAFT MND/IS
5.17. Transportation
TRANSPORTATION
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedes - trian facilities?
☐ ☒ ☐ ☐
(b) Conflict or be inconsistent with CEQA Guidelines §15064.3, subdivision (b)?
☐ ☐ ☒ ☐
(c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
☐ ☒ ☐ ☐
(d) Result in inadequate emergency access? ☐ ☒ ☐ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.17.1. Setting
The proposed Project would use local roadways for accessing work areas during construction. Road ways along the proposed Project route may be temporarily disrupted during installation of the new transmis - sion line. Baseline conditions of regional and local roadways likely used to access the proposed Project area and work locations and those temporarily affected by proposed Project construction activities are discussed below.
5.17.1.1. Highways
The following highways provide regional access to the proposed Project area and staging areas in the City (City of Santa Clara, 2014):
U.S. Highway (U.S.) 101, specifically the section of U.S. 101 known as Bayshore Freeway, is an 8 -lane divided (4 lanes per direction) south -north highway that travels the length of the West Coast. The San Tomas Expressway exit or the De La Cruz Boulevard/Trimble Road exit from U.S 101 would likely be used to access the Project area. At the San Tomas Expressway exit, the year 2016 average daily traffic (ADT) volumes on U.S. 101 were 193,000 vehicles per day. At th e De La Cruz Boulevard/Trimble Road exit, the year 2016 ADT volumes on U.S. 101 were 183,000 vehicles per day (Caltrans, 2020). Year 2016 ADT volumes represent the most recently published data. State Route (SR) 237, or Southbay Freeway, is a 6-lane- divided west-east highway that connects Inter- state (I) -880 and I680 with U.S. 101 and SR 85 and extends northeast through the city. The Great America Parkway exit would likely be - used to access the Project area. At this exit, year 2016 ADT volumes on SR 237 were 124,000 vehicles per day (Caltrans, 2020). Interstate 280, or Junipero Serra Freeway, is a 10-lane south-north regional highway that connects I880 and SR1 and extends through the City. The exit at the junction of I280 with SR 17 and I880 would likely be the used to access the Project area. At this exit, year 201 6 ADT volumes on I280 were 205,000 vehicles per day (Caltrans, 2020).
5.17.1.2. Local Roads
CEQA now analyzes project impacts in terms of vehicle miles traveled (VMT) to better understand such parameters as air quality impacts, fuel consumption, and commute times. The VMT approach is reasonable for projects that will generate traffic to and from the project site over time, such as offices, apartments, factories, and shopping centers. However, for projects that have a temporary traffic impact related to construction, after which traffic generation is minimal or non -existent, the primary concern is with the NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-2 ADMINISTRATIVE DRAFT MND/IS
project’s impact on congestion during construction. To understand congestion and traffic delays, roadway and intersection operating conditions and the adequacy of existing roadway systems to accommodate traffic can be described in terms of level of service (LOS) ratings. LOS is expressed as A through F, with LOS A as the best operating conditions (characterized by free-flow traffic, low volumes, and little or no restrictions on maneuverability) and LOS F being the worst operating conditions (stop -and-go traffic flow with high traffic densities and slow travel speeds). The analysis in this section considers LOS impacts.
Access Routes
Table 5.17 -1 provides information on some primarily local travel routes that would likely be used by project-related vehicles to access the construction staging yards and the proposed Project alignment.
Details on access routes that would also be disrupted by project construction are discussed below under “Roadways Disrupted by Project Construction” and are not repeated in Table 5.17 -1. While the average daily traffic provided in Table 5.17 -1 are from 2011, it remains the most currently available ADT volume data for these roadways.
Table 5.17-1. Existing Local Roadway Conditions
Street Lanes ADT Volume LOS
Montague Expressway (between De La Cruz Boulevard and Lafayette Street) 8 60,570 D Montague Expressway (between Lafayette Street and Mission College Boulevard) 8 58,070 D Central Expressway (Lafayette Street and De La Cruz Boulevard) 8 59,700 D Central Expressway (between Scott Boulevard and Lafayette Street) 8 47,550 D Agnew Road (between Lafayette Street and Montague Expressway) 4 14,820 D Lafayette Street (between Tasman Drive and Montague Expressway) 4 18,370 D Lafayette Street (between Montague Expressway and US 101) 4 11,600 C Lafayette Street (between US 101 and Central Expressway) 4 18,190 D LOS = level of service
Source: City of Santa Clara, 2011.
Roadways Disrupted by Project Construction
Construction of the proposed Project could result in a temporary disruption to local roadways during deli- very of large equipment or materials and during installation of poles and conductors along the transmission line alignment on Lafayette Street. The main roads that may require temporary lane closures and/or escort vehicles to facilitate material and equipment deliveries include Lafayette Street, Agnew Road, Montague Expressway, and Central Expressway, a combina tion of which could be used to access the smaller local roads which may be used to access the transmission route and the substations.
5.17.1.3. Mass Transit
Bus
Existing public transit service within the City is primarily provided by Santa Clara Valley Transportation Authority (VTA) and consists of bus, light rail transit, and paratransit services. VTA bus route 20 crosses the proposed Project at Agnew Road (VTA, 2021). Route 10 travels along Agnew Road in the central part of the proposed transmission line route (VTA, 2021).
Passenger Rail
Existing commuter rail lines include Caltrain, operated by the Peninsula Joint Powers Board (JPB), and Altamont Commuter Express (ACE), operated by the San Joaquin Regional Rail Commission. Both stop at the Santa Clara Transit Center, approximately 2 miles south of Kifer Receiving Station. The Capitol Corridor NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-3 ADMINISTRATIVE DRAFT MND/IS
commuter rail line, operated by the Capitol Corridor Joint Powers Authority (CCJPA), stops at the Great America Station approximately 0.4 miles northwest of the Northern Receiving Station and provides transit services between Sacramento and San Jose. Planned transit developments in the City include a possible extension of Bay Area Rapid Transit (BART) to the Santa Clara Transit Center, High Speed Rail along the Caltrain corridor, and the Agnew Siding Project along the Capital Corridor. (City of Santa Clara, 2011 and 2014)
5.17.1.4. Rail (Freight)
Outside peak commuter rail periods, the Union Pacific Railroad (UPRR) provides freight operations within the Caltrain right
-of-way
(ROW). The Caltrain ROW traverses through the middle and downtown areas of the City. The rail network includes grade-sep
arated and at-gra
de railroad crossings. The network includes
the potential for additional crossings to accommodate a future high-speed rail. (City of Santa Clara, 2014)
5.17.1.5. Bicycle
Existing bicycle facilities are part of City Bicycle and Trail Network, providing connections between resi- dential neighborhoods, employment, recreation, education, and transit centers within the City (City of Santa Clara, 2014). Bikeways are typically classified as Class I, II, or III facilities. Bike paths or trails (also known as Class I bikeways) operate within a right-of-way separated from vehicular traffic. Bike lanes (also known as Class II bikeways) are located within roadways but are delineated by warning symbols and strip- ing. Bike routes (also known as Class III bikeways) operate in the shoulder lane of roadways but are not delineated by striping. One Class II bikeway is located along De La Cruz Boulevard on the section of the Boulevard north of the proposed Project route (City of Santa Clara, 2013).
5.17.1.6. Air Transportation
The Norman Y. Mineta San Jose International Airport (Airport) is southeast of the Kifer Receiving Station in San Jose, adjacent to the City.
Regulatory Background
Federal
14 CFR Part 77 – Safe, Efficient Use, and Preservation of the Navigable Airspace. Construction of a project could potentially impact aviation activities if a structure or equipment were positioned such that it would be a hazard to navigable airspace. The Federal Aviation Administration (FAA) has established reporting requirements if any construction includes equipment or structures more than 200 feet above ground level or results in an object penetrating an imaginary surface extending outward and upward at a ratio of 100 to 1 from a public or military airport runway out to a horizontal distance of 20,000 feet (approximately
3.78 miles) (FAA, 2016). For areas around heliports, this same requirement applies to any construction that is more than 200 feet above ground level or would penetrate an imaginary surface extending outward and upward at a ratio 25 to 1 from a public or military heliport out to a horizontal distance of 5,000 feet.
State
California Vehicle Code (CVC). The CVC includes regulations pertaining to licensing, size, weight, and load of vehicles operated on highways; safe operation of vehicles; and the transportation of hazardous materials.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-4 ADMINISTRATIVE DRAFT MND/IS
Local
City of Santa Clara General Plan. The objectives of the City’s mobility and transportation policies are to a safe, efficient, convenient, and integrated system to move people and goods and promote a reduction in the use of personal vehicles and vehicle miles traveled. The following policies in the General Plan generally relate to the proposed Project (City of Santa Clara, 2014):
Policy 5.8.2-P3. Encourage undergrounding of utilities and utility equipment within the public right-of- wa
y and site these facilities to provide opportunities for street trees and adequate sidewalks. Policy 5.8.5-P1. Require new development and City employees to implement transportation demand management programs that can include site-des
ign measures, including preferred carpool and vanpool
parking, enhanced pedestrian access, bicycle storage and recreational facilities. Policy 5.8.5-P4. Encourage new development to participate in shuttle programs to access local transit services within the City, including buses, light rail, Bay Area Rapid Transit, Caltrain, Altamont Commuter Express Yellow Shuttle, and Lawrence Caltrain Bowers/Walsh Shuttle services.
5.17.2. Environmental Impacts and Mitigation Measures
(a) Would the project conflict with a program plan, ordinance or policy addressing the circulation sys- tem, including transit, roadway, bicycle, and pedestrian facilities? LESS THAN SIGNIFICANT WITH MITIGATION – CONSTRUCTION. Project construction would occur in a highly urban- ized setting and would therefore create impacts to public, private, and pedestrian transit in the project area. Some road closures and/or one-way traffic controls would be required to allow for certain con- struction activities and to maintain public safety. These closures and controls would decrease traffic flow and parking availability in the project area, particularly on Lafayette Street. The ROW width that would be required for the transmission line would vary depending on the location, but in general, is approximately 50 feet. SVP would obtain encroachment permits to conduct work in public and railroad ROWs in accord- ance with applicable City and UPRR requirements. Many of the existing power lines in the Project vicinity are located along the edges of the roadway, such as in landscaped planter areas, the perimeters of parking lots, or along sidewalks. From NRS to Palm Substation at Agnew Road, the new transmission line would be either underground or on poles in the median of Lafayette Street. South of Palm Substation, the lines would be overhead on poles along the east side of Lafayette Street to Montague Expressway, where the line would cross to the west side of Bassett Street. The lines would be mainly located at the west edge of the roadway and continue to Kifer Receiving Station (See Figure 4-1) and be installed in the same general locations as the existing power lines.
While construction would create impacts, these impacts would be localized, temporary in nature, and would not change long-term traffic loads or patterns. Mitigation Measure T1 is proposed to provide speci- ficity regarding the requirements of a construction Traffic Control Plan. The purpose of this plan would be to reduce potential impacts to the circulation system from the closure/disruption to roadways and travel lanes. With the incorporation of this mitigation, construction would not conflict with programs, policies, plans, or ordinances regarding public roadway, transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities.
N
O IMPACT – OPERATIONS AND MAINTENANCE. SVP’s existing maintenance and operations group would assume inspection, patrol, and maintenance duties as needed. Typical maintenance activities involve both routine inspections and preventive maintenance to ensure service reliability, as well as emergency work to main- tain or restore service continuity. No additional staff would be required after Project construction work is completed. No substantial increase in traffic or traffic -related impacts would occur due to operation and maintenance activities.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-5 ADMINISTRATIVE DRAFT MND/IS
Mitigation Measures for Transportation Impacts
MM T-1 Construction Traffic Control Plan. Prior to the start of construction, SVP or its designee shall prepare and submit an Encroachment Permit which will include the construction Traffic Control Plan for review and approval to the City’s Department of Public Works for public roads and transportation facilities that would be directly affected by the construction activities and/or would require permits and approvals. SVP shall submit the construction Traffic Control Plan to the City prior to conducting activities covered in the traffic control permits. The Construction Traffic Control Plan shall include, but not be limited to:
The locations and use of flaggers, warning signs, lights, barricades, delineators, cones, arrow boards, etc., according to standard guidelines outlined in the Manual on Uniform Traffic Control Devices, the Standard Specifications for Public Works Construction, and/or the California Joint Utility Traffic Control Manual. Additional methods to reduce temporary traffic delays and trips during peak travel hours to the extent feasible.
Typical access routes between all staging areas and the proposed work areas. Defining methods to coordinate with the City throughout construction to minimize cumulative lane disruption impacts should simultaneous construction projects affect shared segments /portions of the circulation system.
Prior to the start of construction, provide (or identify the timing to provide) the City with methods to comply with all specified requirements. Plans to coordinate in advance with emergency service providers to avoid restricting the movements of emergency vehicles. Police departments and fire departments shall be notified in advance by SVP of the proposed locations, nature, timing, and duration of any roadway disruptions, and shall be advised of any access restrictions that could impact their effectiveness. At locations where roads will be blocked, provisions shall be ready at all times to accommodate emergency vehicles, such as immediately stopping work for emergency vehicle passage, providing short detours, and developing alternate routes in conjunction with the public agencies. Documentation of the coordination with police and fire departments shall be gathered prior to the start of construction. Plans to coordinate in advance with property owners, if any, that may have limited access to properties due to temporary lane closures. Provisions for ensuring secondary access should be provided.
Plans to coordinate with Valley Transportation Authority in advance of construction to minimize disruption to mass transit.
(b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? L
ESS THAN SIGNIFICANT – CONSTRUCTION. CEQA Guidelines section 15064.3(b) concerns vehicle miles travelled (VMT) as the measure of transportation impacts. Prior to July 1, 2020, use of the provisions of section 15064.3(b) was at the discretion of the CEQA lead agency but are now mandatory statewide. As discussed in CEQA Guidelines Section 15064.3(b)(3), a qualitative analysis of construc tion traffic vehicle miles travelled (VMT) may be appropriate.
Construction of the proposed Project would occur over approximately 14 months (for Option 1) and proposed Project–related traffic would be limited to worker commutes and the transport of supplies and equipment to and from construction areas and material supply sources. Once the Project is completed, the vehicle trips associated with construction would end. The total peak number of vehicle trips is NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-6 ADMINISTRATIVE DRAFT MND/IS
estimated to be up to 30 roundtrips daily. Construction personnel would commute to the staging yards and work sites at the beginning of the day and leave at the end of the day, and few people would travel to and from work areas throughout the middle of the day.
Vehicle miles traveled by personal vehicle trips and truck trips during construction would vary in their origins and destinations, but they are assumed to come primarily from the local or Bay Area and they would be periodic and temporary. At this time, no known applicable VMT thresholds of significance for temporary construction trips that may indicate a significant impact is known. Therefore, while the proposed Project would include temporary construction trips with some that may include higher VMT to deliver specialized materials and equipment, they would be short-term and the Project would not affect existing transit uses or corridors and is presumed to cause a less than significant transportation impact under State CEQA Guidelines section 15064.3(b).
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. Maintenance of the proposed Project would require routine inspection and periodic maintenance visits by existing SVP personnel. These activities would generate a negligible number of new vehicle trips with no notable growth in VMT. The transportation impact under State CEQA Guidelines section 15064.3(b) would be less than significant. (c) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? L
ESS THAN SIGNIFICANT WITH MITIGATION – CONSTRUCTION. Heavy equipment operating adjacent to or within a road right-of-way could increase the risk of accidents. Construction of the proposed Project would involve activities within and adjacent to public roadways, requiring temporary lane narrowing and, in some instances, temporary lane or roadway closures. Construction -generated truck traffic on the affected city streets would interact with other vehicles, and potentially create hazards. Potential conflicts also could occur between construction traffic and bicyclists and pedestrians, and potential short-term hazards could be associated with temporary lane closures during construction. Construction traffic–related impacts would be reduced with implementation of Mitigation Measure T-1 (Construction Traffic Control Plan) to ensure temporary lane closures and construction activities do not result in increased hazards to the traffic circulation system.
Mitigation Measure T1 requires the Project applicant to obtain and adhere to all requirements of an Encroachment Permit from the City, and to prepare a Traffic Control Plan that provides for the safe and efficient movement of emergency vehicles, bicycles, pedestrians, and transit vehicles through or around construction zones while protecting the workers, equipment, and construction areas. While there may be a limited increase in hazards due to construction activities proximate to public roadways, constructi on would be temporary and with the incorporation of Mitigation Measure T1, temporary impacts during construction would be less than significant.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. The height and form of the proposed Project struc- tures would be similar to the existing 115 kV transmission structures located adjacent to roadways throughout the City and they are not expected to increase transportation hazards or be an incompatible use. Maintenance of the proposed Project would require routine inspection and periodic maintenance visits. While temporary lane closures are not anticipated, occasionally maintenance vehicles or equipment may be temporarily present alongside the roadways depending on structure locations; however, at least one lane of travel would remain open at all times. Therefore, the Project would not cause hazards or incompatible uses due to maintenance activities proximate to public roadways; no mitigation is required.
Mitigation Measures for Transportation Hazards
MM T-1 Construction Traffic Control Plan. [see full text under Item (a) above] NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.17. TRANSPORTATION
SEPTEMBER 2024 5.17-7 ADMINISTRATIVE DRAFT MND/IS
(d) Would the project result in inadequate emergency access? LESS THAN SIGNIFICANT WITH MITIGATION – CONSTRUCTION. Construction of the proposed Project would cause a minor short-term increase in the local traffic and congestion in the immediate vicinity of the section of the proposed route if there would be a temporary lane closure. The proposed Project would not increase traffic substantially as compared to the existing traffic volume and the capacity of the street system in the area. At least one lane of travel through each construction area would remain open throughout the con - struction period to acco mmodate roadway users (including emergency vehicles). To ensure temporary lane closures do not result in inadequate emergency vehicle movements or impede access to property, Mitigation Measure T-1 (Construction Traffic Control Plan) is proposed and would require review an d approval of a project-specific Construction Traffic Control Plan, which would include specific measures to address temporary closures/disruptions to travel lanes and plans to coordinate in advance with emer- gency service providers. With the incorporation of Mitigation Measure T -1, temporary impacts during construction would be less than significant.
L
ESS THAN SIGNIFICANT – OPERATION AND MAINTENANCE. Once operational, the proposed Project would have minimal impact on access or movement to emergency service providers. Occasional maintenance activi- ties would be short-term in duration throughout the project area. While temporary lane closures are not anticipated, occasionally maintenance vehicles or equipment may be temporarily present alongside the roadways depending on structure locations; however, at least one lane of travel would remain open at all times. Therefore, maintenance of the proposed Proje ct would have a less than significant impact on emergency vehicle access and movements.
Mitigation Measures for Emergency Access
MM T-1 Construction Traffic Control Plan. [see full text under Item (a) above]
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.18. TRIBAL CULTURAL RESOURCES
SEPTEMBER 2024 5.18-1 ADMINISTRATIVE DRAFT MND/IS
5.18. Tribal Cultural Resources
TRIBAL CULTURAL RESOURCES Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Would the project cause a substantial adverse change in the sig- nificance of a tribal cultural resource, defined in Public Resources Code §21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i) listed or eligible for listing in the California Register of Histori- cal Resources, or in a local register of historical resources as defined in Public Resources Code §5020.1(k), or
☐ ☒ ☐ ☐
ii) a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Pu blic Resource Code §5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.
☐ ☒ ☐ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.18.1. Setting
Tribal Cultural Resources (TCRs) are defined under Assembly Bill 52 (AB 52) as resources that include sites, features, places, cultural landscapes, and sacred places or objects that have cultural value or significance to a California Native American tribe. Tribal representatives are considered experts appro priate for providing substantial evidence regarding the locations, types, and significance of TCRs within their tradi - tional and cultural affiliated geographic areas, and therefore the identification and analysis of TCRs should involve government -to-government tribal consultation between the CEQA lead agency and interested tribal groups and/or tribal persons (Public Resources Code [PRC] §21080.3.1(a)).
Additionally, best practices show that a lead agency should make a good faith effort to identify TCRs that may be impacted by a Project even if a Native American tribe does not identify any during consultation.
This includes requesting a search of the Native American Heritage Commission’s (NAHC) Sacred Lands file, conducting ethnographic research, and using information that has been previously provided during tribal consultation for other projects in the area.
5.18.1.1. Record Search
As documented in Section 5.5 (Cultural Resources), the records search indicates that no prehistoric cul - tural resources have been previously identified in the Project area.
5.18.1.2. Ethnographic Setting
The Project area is located within the tribal territory of the “Costanoan,” a term derived from the Spanish word Costanos, meaning “coast people” or “coastal dwellers.” At the time of European ethnic groups’ arrival, the Costanoan occupied the central California coast from the northern end of the San Francisco Peninsula south to Big Sur and as far east as the Diablo Range. An estimated 1,400 or more persons of partial Costanoan descent currently reside in the greater San Francisco Bay Area. These individuals now generally prefer the term Ohlone to identify themselves (Margolin, 1978).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.18. TRIBAL CULTURAL RESOURCES
SEPTEMBER 2024 5.18-2 ADMINISTRATIVE DRAFT MND/IS
The Costanoan language is part of the Penutian language family spoken by other California Indian groups known as the Wintun, Maidu, Miwok, and Yokuts. The Costanoan (Ohlone) language family consists of six dialect clusters, of which three were recorded during the ethnohistoric period, including the San Francisco Bay Costanoan, Mutsun along the Pajaro River, and Rumsen near Monterey and Carmel (Golla, 2011:162 163). Linguistic analysis suggests that the Costanoans moved into the Bay Area from the San Joaquin and Sacramento River regions around 1,500 years Before Present ( BP) and replaced the original Hokan speaking population of the Bay Area. This appears to coincide with the appearance of Late Horizon artifact assemblages. Using Spanish mission records and archaeological data, researchers have estimated a Costanoan population of 1,000 to 1,200 individuals for the Santa Clara Valley in 1770 (Levy, 1978:485; King, 1977:54).
The Costanoan practiced a hunting and collecting economy focusing on the collection of seasonal plant and animal resources, including tidal and marine resources from San Francisco Bay. They traded with neighboring groups and exported shells, salt, and cinnabar among other items. At the time of contact with Europeans, the Costanoan people were living in approximately 50 separate and politically auto nomous tribelets, with each group having one or more permanent villages surrounded by a number of temporary camps used to exploit seasonally available floral and faunal resources (Levy, 1978:485, 487).
Mission Santa Clara and Mission San José were established in the South Bay in the late 1770s. The aboriginal lifeway disappeared by 1810 due to diseases, a declining birth rate, and the impact of the mission system. Missionization not only decimated local populations but also relocated native peoples from throughout north-central California to the San José area. The Costanoan/Ohlone were trans formed from hunters and gatherers into agricultural laborers (and in some cases, craft artisans) who lived at the missions and worked with former neighboring Native American groups such as the Esselen, Yokuts, and Miwok (Levy, 1978:486).
With secularization of the missions by Mexico in 1834, most of the aboriginal population gradually moved to ranchos to work as manual laborers (Levy, 1978:486). During the Mexican Period several ranchos were granted to Native Americans. Rancho Ulistac, located on the west bank of the Guadalupe River in the City of Santa Clara, was granted to “emancipated” Mission Indians Marcello, Pio, and Cristobal in 1845 (Hendry and Bowman, 1940:872 873). Rancho Posolmi, located along the Guadalupe River at the northeast ern boundary of the City of Mountain View, was granted to Lopez Indigo (or Yndigo) in 1881 (City of San Jose, 2011).
Contemporary descendants of the Costanoan (Ohlone) Native Americans are not members of federally recognized tribes. Ohlone recognition and assertion began to move to the forefront during the early twentieth century, enforced by legal suits brought against the United States government by Indians of California (1928–1964) for reparations due them for the loss of traditional lands. The Ohlone/Costanoan Muwekma Tribe, consisting of surviving Native American lineages who trace their ancestry through Missions Dolores, Santa Clara and San José. The State of California has recognized the validity of unrecog- nized tribal groups of local Native Americans and has afforded both the groups and Native American individuals status in regard to consultation for planning and CEQA compliance.
5.18.1.3. Regulatory Setting
State
California Environmental Quality Act. CEQA requires that impacts to TCRs be identified and, if impacts would be significant, that mitigation measures be implemented to reduce those impacts to the extent feasible (PRC §21081). In the protection and management of the cultural environment, both the statute and the CEQA Guidelines (14 California Code of Regulations §15000 et seq.) provide definitions and standards for management of TCRs.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.18. TRIBAL CULTURAL RESOURCES
SEPTEMBER 2024 5.18-3 ADMINISTRATIVE DRAFT MND/IS
PRC Section 21074 defines a TCR as “a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe.” TCRs also include “non-unique archaeological resources” that may not be scientifically significant, but still hold sacred or cultural value to a consulting tribe.
A resource shall be considered significant if it is: (1) listed or eligible for listing in the California Register of Historical Resources (CRHR), or in a local register of historical resources as defined in PRC Section 5020.1(k); or “(2) a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of PRC Section 5024.1. In applying these criteria, the lead agency must consider the significance of the resource to a California Native American tribe.”
Therefore, a project may have substantial adverse change in the significance of a TCR if a project may cause a substantial adverse change in the significance of a tribal cultural resource (PRC §21084.2) or the resource is listed, or eligible for listing, in the CRHR or in a local register of historical resources, and it is demolished (CEQA Guidelines §15064.5(b)(2)).
The fact that a TCR is not listed in the CRHR, determined to be ineligible for listing in the CRHR, not included in a local register of historical resources, or is not identified in a historical resources survey does not preclude a lead agency from determining that the resource may be a historical resource.
CEQA Guidelines Section 15064.5(b)(1) explains that effects on historical resources (or TCRs, if so deter- mined by the lead agency) would be considered adverse if it involves physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of the resource would be materially impaired. Adverse effects on historical resources may result in a project having a significant effect on the environment. CEQA Guidelines Section 15064.5(c)(3) requires that TCRs receive treatment under PRC Section 21083.2, which requires that these resources be preserved in place or left in an undisturbed state. If these treatments are not possible, then mitigation for significant effects is required, as outlined in PRC Section 21082.2(c).
5.18.1.4. Assembly Bill 52 Tribal Consultation
The proposed Project’s effects on potentially buried and therefore presently unidentified TCRs were eval- uated using the significance criteria set forth in Appendix G of the CEQA Guidelines and with consideration to AB 52 and the Governor’s Office of Planning and Research’s “Technical Advisory: AB 52 and Tribal Cultural Resources in CEQA” (OPR, 2017).
Representatives of the Tamien Nation had previously requested to be contacted regarding projects within the City of Santa Clara. Two representatives of the Tamien Nation requesting to be contacted under AB 52 for possible tribal consultation were notified of the proposed Project and invited to engage in consultation.
The invitation was extended to each representative by registered mail (April 11, 2024). No responses were received to the emails or letters during the 30 -day response period. This concluded AB 52 compliance under CEQA.
5.18.1.5. NAHC Sacred Lands File Search
Aspen requested a search of the NAHC’s Sacred Lands file to determine the presence or likelihood of encountering TCRs within the Project area. On March 27, 2024, the NAHC responded that the search was completed with negative results (i.e., no sacred sites are located within the Project area or surrounding vicinity).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.18. TRIBAL CULTURAL RESOURCES
SEPTEMBER 2024 5.18-4 ADMINISTRATIVE DRAFT MND/IS
5.18.2. Environmental Impacts and Mitigation Measures
(a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural land scape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)? L
ESS THAN SIGNIFICANT WITH MITIGATION. There are no TCRs listed in, or are known to be eligible for listing in, the CRHR or local register of historical resources within the proposed Project area. Although there is no evidence that TCRs exist within the proposed Project site or immediate vicinity, it is possible that previously unidentified TCRs that may be eligible for inclusion in the NRHP, CRHR, or local registers could be discovered and damaged, or destroyed, during project -related ground disturbance, as both Project options involve ground disturbance. This would constitute a significant impact absent mitigation. Imple- mentation of mitigation measure MM TCR-1 would evaluate and protect unanticipated TCR discoveries, thereby reducing this impact to a less than significant level after mitigation.
MM TCR-1 Management of Unanticipated Tribal Cultural Resources. During project construction, should subsurface tribal cultural resources be discovered, all activity in the vicinity of the find shall stop and a qualified archaeologist and an authorized tribal representative shall be contacted to assess the significance of the find according to CEQA Guidelines Section 15064.5 and Section 21074. If any find is determined to be significant, the archaeologist shall determine, in consultation with the implementing agency and any local Native American groups expressing interest, appropriate avoidance measures or other appropri- ate mitigation. Per CEQA Guidelines Section 15126.4(b)(3), preservation in place shall be the preferred means to avoid impacts to tribal cultural resources. Methods of avoidance may include, but shall not be limited to, Project reroute or redesign, , or identification of protection measures such as capping or fencing. Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if it is demonstrated that resources cannot be avoided, the qualified archaeologist shall develop additional treatment measures, such as data recovery or other appropriate measures, in consultation with the implementing agency and any local Native American representatives expressing interest in the tribal cultural resource. ii. a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
L
ESS THAN SIGNIFICANT WITH MITIGATION. No known TCRs were identified during a search of the NAHC’s Sacred Lands File, record search, or during ethnographic research. Nevertheless, it is possible that previously unidentified TCRs that may qualify as a significant resource according to lead agency determination could be discovered and damaged or destroyed during ground disturbance, as both Project options involve ground disturbance. Such a discovery or inadvertent damage/destruction to a previously unknown TCR would constitute a significant impact absent mitigation. Implementation of mitigation measure MM TCR-1, which is discussed under Item (a), would evaluate and protect unanticipated TCR discoveries, thereby reducing this impact to a less than significant level.
MM TCR-1 Management of Unanticipated Tribal Cultural Resources [see full text under Item (a) above]
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-1 ADMINISTRATIVE DRAFT MND/IS
5.19. Utilities and Service Systems
UTILITIES AND SERVICE SYSTEMS
Would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environ- mental effects?
☐ ☐ ☒ ☐
(b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
☐ ☐ ☒ ☐
(c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
☐ ☐ ☒ ☐
(d) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
☐ ☐ ☒ ☐
(e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
☐ ☐ ☐ ☒
Significance criteria established by CEQA Guidelines, Appendix G.
5.19.1. Setting
Utility and services system facilities associated with electricity, domestic (potable) water, stormwater, solid waste, communications, and natural gas are provided and maintained by a variety of local purveyors, including cities, counties, special districts, water agencies, and private companies. Table 5.19-1 lists utility providers in the area.
Table 5.19-1. Utility Providers
Natural gas: Pacific Gas & Electric Company
Electricity: Silicon Valley Power
Water: City of San Francisco’s Hetch Hetchy aqueduct, Santa Clara Valley Water District, Santa Clara City-owned wells
Wastewater: San José-Santa Clara Water Pollution Control Plant Telephone: AT&T, Comcast
Solid Waste: Mission Trail Waste Systems, Allied Waste, Green Waste Recovery, and Los Gatos Garbage Company
Source: City of Santa Clara, 2014
5.19.1.1. Utilities
Water Supply
Potable water for the City comes from a combination of sources: the City of San Francisco’s Hetch Hetchy aqueduct system, the Santa Clara Valley Water District, and groundwater from City -o wned wells.
Groundwater comprises almost 70 percent of the City’s water supply. Recycled wastewater is also used in the City for certain landscape irrigation, industrial, and construction purposes (City of Santa Clara, 2014).
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-2 ADMINISTRATIVE DRAFT MND/IS
Electricity and Natural Gas
Silicon Valley Power (SVP) is owned and operated by the City as a municipal electric utility and as a department of the City. SVP maintains approximately 383 miles of underground distribution lines, nearly 200 miles of overhead distribution lines and over 60 miles of transmission lines. Electricity for the City is provided from natural gas, wind, solar, geothermal, and hydroelectric generation resources in California and other western states (Silicon Valley Power, 2023).
The City’s natural gas is provided by Pacific Gas & Electric Company. Transmission mains deliver gas from basins in California, Canada, and the Western United States (City of Santa Clara, 2014).
5.19.1.2. Service Systems
Sewage/Wastewater
Sewer systems collect wastewater in the City and transport it via pipelines to the San Jose –Santa Clara Regional Wastewater Facility (RWF) in San Jose, CA. The RWF treats approximately 110 million gallons per day (mgd) of wastewater from cities in Santa Clara County and is able to treat up to 167 mgd. (City of San Jose, 2024).
About 10 percent of the total treated wastewater from the RWF is directed into the South Bay Water Recycling system. The treated wastewater is used for landscaping irrigation, dual plumbing, industrial uses, and other approved uses around the southern Bay Area. Recycled water distribution pipelines are located throughout the City. Treated wastewater that is not directed into the recycled water pipelines is discharged into San Francisco Bay (City of Santa Clara, 2014).
Solid Waste Disposal
Solid waste and recycling collection services in the City is primarily provided by four companies: Mission Trail Waste Systems, Allied Waste, Green Waste Recovery, and Los Gatos Garbage Company. Newby Island Sanitary Landfill is the main landfill that serves the City, although solid wastes are also sent to landfills outside of Santa Clara County (City of Santa Clara, 2014). Newby Island Sanitary Landfill is located at 1601 Dixon Landing Road, Milpitas, CA, approximately 5.5 miles north of the proposed Project. Guadalupe Sanitary Landfill is located in San Jose, and Corinda Los Trancos Landfill is located in Half Moon Bay, approximately 12 miles south and 27 miles northwest from the proposed Project, respectively.
Table 5.19-2 lists the capacities of landfills in or near the City of Santa Clara.
Table 5.19-2 Landfill Capacities
Landfill Name
Total Capacity
(cu.yd.)
Remaining
Capacity
(cu.yd.)
Remaining
Capacity
(percent)
Maximum
Throughput
(tons/day)
Newby Island Sanitary Landfill
(Cease operation estimated 2041)
57,500,000 16,400,000 28.5 4,000
Guadalupe Sanitary Landfill
(Cease operation estimated 2043)
28,238,855 7,518,220 26.6 3,650
Corinda Los Trancos Landfill
(Cease operation estimated 2034)
60,500,000 22,180,000 36.7 3,598
Sources: CalRecycle, 2024a; CalRecycle, 2024b; CalRecycle, 2024c NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-3 ADMINISTRATIVE DRAFT MND/IS
Regulatory Background
This section includes a description of the utilities and public service systems regulatory framework.
Federal
Clean Water Act Section 402: National Pollutant Discharge Elimination System. Section 202 of the Clean Water Act (CWA) establishes the National Pollutant Discharge Elimination System (NPDES) permit program to regulate point source discharges of pollutants to Waters of the United States. Discharges or construction activities that disturb one or more acres, which includes the proposed Project, are regulated under the NPDES stormwater program and are required to obtain coverage permit under a NPDES Construction General Permit. The Construction General Permit establishes limits and other requirements such as the implementation of a Stormwater Pollution Prevention Plan, which would further specify best management practices to avoid or eliminate pollution discharge into the nation’s waters. The State Water Resources Control Board (SWRCB) issues both general and individual permits under this program. The SWRCB delegates much of its NPDES authority to nine regional water quality control boards. The proposed Project’s NPDES permits would be under jurisdiction of Region 2, the San Francisco Regional Water Quality Control Board.
State
California Government Code – Protection of Underground Infrastructure. The responsibilities of Cali - fornia utility operators working in the vicinity of utilities are detailed in Section 1, Chapter 3.1, “Protection of Underground Infrastructure” (Article 2 of California Government Code §§4216-4216.9). This law requires that an excavator must contact a regional notification center at least two days prior to excavation of any subsurface installation. Any utility provider seeking to begin a project that may d amage under- ground infrastructure can call Underground Service Alert, the regional notification center. Under ground Service Alert will notify the utilities that may have buried lines within 1,000 feet of the project. Represent- atives of the utilities are required to mark the specific location of their facilities within the work area prior to the start of project activities in the area. The code also requires excavators to probe and expose underground facilities by hand prior to using power equipment.
California Integrated Waste Management Act of 1989. Assembly Bill 939 codified the California Inte- grated Waste Management Act of 1989 in the Public Resources Code and established a hierarchy to help the California Integrated Waste Management Board (CIWMB) and local agencies implement three major priorities under the Integrated Waste Management Act: source reductions; recycling and composting; and environmentally safe transformation and land disposal. Waste diversion mandates are included under these priorities. The duties and responsibilities of the CIWMB have since been transferred to the California Department of Resources Recycling and Recovery (CalRecycle) after the abolishment of the CIWMB in 2010, but all other aspects of the Act remain unchanged.
The Act requires all local and county governments to adopt a waste reduction measure designed to manage and reduce the amount of solid waste sent to landfills. This Act established reduction goals of 25 percent by the year 1995 and 50 percent by the year 2000. Senate Bill 1016 (2007) streamlines the process of goal measurement related to Assembly Bill 939 by using a disposal -based indicator: the per capita disposal rate. The per capita disposal rate uses two factors: the jurisdiction’s population (employment can be considered in place of population in certain circumstances) and the jurisdiction’s disposal as reported by disposal facilities. CalRecycle encourages reduction measures through the con tinued implementation of reduction measures, legislation, infrastructure, and support of local requirements for new developments to include areas for waste disposal and recycling on-site.
California Code of Regulations (Title 27). Title 27 (Environmental Protection) of the California Code of Regulations defines regulations and minimum standards for the treatment, storage, processing, and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-4 ADMINISTRATIVE DRAFT MND/IS
disposal of solid waste at disposal sites. The State Water Resources Control Board maintains and regulates compliance with Title 27 (Environmental Protection) of the California Code of Regulations by establishing waste and site classifications and waste management requirements for solid waste treatment, storage, or disposal in landfills, surface impoundments, waste piles, and land treatment units. The compliance of the proposed Project would be enforced by the San Francisco RWQCB Region 2 and the California Department of Resources Recycling and Recovery (CalRecycle) (formerly the California Integrated Waste Management Board). Compost facilities are regulated under CCR Title 14, Division 7, Chapter 3.1 Section 17850 through 17895, by CalRecycle. Permit req uests, Reports of Waste Discharge, and Reports and Disposal Site Information are submitted to the RWQCB and CalRecycle, and are used by the two agencies to review, permit, and monitor these facilities.
Local
Energy Policies. The purpose of the City’s energy policies is to encourage reduced energy use. The following policies in the General Plan generally relate to the proposed Project (City of Santa Clara, 2014):
Policy 5.10.3-P10. Maintain the City’s level of service for high quality utilities and telecommunications infrastructure.
Policy 5.10.3 -P12. Work with SVP to implement adequate energy distribution facilities to meet the demand generated by new development.
Wat
er Policies. The purpose of the City’s water policies is to off- set increased demand associated with the implementation of the City General Plan. The following policies in the General Plan generally relate to the proposed Project (City of Santa Clara, 2014):
Policy 5.10.4-P10. Work with Santa Clara Valley Water District to minimize undesirable compaction of aquifers and subsidence of soils.
5.19.2. Environmental Impacts and Mitigation Measures
(a) Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunica - tions facilities, the construction or relocation of which could cause significant environmental effects?
L
ESS THAN SIGNIFICANT. Under Option 1, the entire proposed Project would be built Overhead. Under Option 2, the northern 0.74 miles of the proposed Project would be placed underground. For both Options, the proposed Project would involve construction of a new 115 kV transmission line that will be built to 230 kV standards, and underbuilding existing transmission/distribution lines on the new transmission structures for the southern segment of the Project.
Water, Wastewater Treatment or Storm Water Facilities. Construction of the proposed Project would generate minimal demand for water or wastewater treatment. A water truck or hose may be on -site to support dust suppression during ground disturbing work. Any water used for dust control would be dispersed onsite and would either evaporate or be absorbed into the ground; therefore, no wastewater generation is anticipated from this use.
Concrete would be required for pole foundations and any vaults and underground conduits for lines underground. Excess concrete from construction as well as removed concrete foundations of poles no longer needed would be disposed of at an approved site away from the work area. Dewatering may be necessary if groundwater is encountered. Portable toilets would be provided for construction work crews and would be removed after construction is completed. These toilets will be maintained by a licensed sanitation contractor.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-5 ADMINISTRATIVE DRAFT MND/IS
The proposed Project would not result in any increased stormwater flow entering stormwater drainage systems and therefore would not require, or result in the construction of, new stormwater drainage facilities or the expansion of existing facilities.
Upon completion of construction, the proposed Project would not generate any demand for water or wastewater treatment. There would be no sanitary sewer hookup as part of the Project. Existing waste - water and water treatment facilities are adequate to accom modate the demand generated by the proposed Project during construction. Thus, the Project would have less than significant impact that would not cause the need for the construction or expansion of water or wastewater treatment facilities or storm water drainage.
Electric Power, Natural Gas, or Telecommunications Facilities. No new natural gas or telecommunica - tions facilities would be required in support of the Project. Construction of the proposed Project would have the potential to disrupt existing underground utility systems or cause a collocation accident.
Coordination with other utility system owners and compliance with California Government Code §§4216– 4216.9 would reduce the likelihood of accidental disruptions from a collocation accident. Prior to initiating underground construction, including drilling for structure footings, SVP or its contractor woul d contact Underground Service Alert to identify any existing underground utilities in the construction zone.
Option 1 would not require the expansion or development of new utility systems. However, it would require minor modifications to some existing electric power and distribution lines and substations. Portions of the 115 kV line would have existing 60 kV circuits underbuilt on the new transmission line. Construction for Option 1 would include minimal utility relocation work at three locations. During routine operation and maintenance of the proposed Project, SVP’s new transmission line would be unstaffed and would not create any need for new or expanded utilities or service systems.
Option 2 would require underground construction and would need to cross existing utilities owned by PG&E, SVP, and the City, numerous times. These utilities range from communication, electric, natural gas, and water lines, as well as sanitary sewers and a storm drain. Due to these conflicts, the transmission line would need to be buried approximately 20 feet deep in some areas.
There are 25 existing underground utilities in the corridor where the line would be underground. These include gas, sewer, storm, water, and electric lines. Option 2 would require the relocation of approxi- mately 300 feet of two existing transmission natur al gas lines, owned by SVP and PG&E, to facilitate the installation of two underground vaults for the Project. The SVP -owned transmission natural gas line is a high-pressure gas line for the Donald Von Raesfeld Power Plant (DVR). The relocation of this line would require a full shutdown of DVR and would need to be coordinated to occur during off -peak times of the year, November through March. It is unknown when the PG&E transmission natural gas line could be relocated. SVP would coordinate with PG&E to schedule the relocation work.
During routine operation and maintenance of the proposed Project, under either option, SVP’s new trans- mission line would be un staffed and would not create any need for new or expanded utilities or service systems. While the relocation of some utilities would create impacts, these would be similar to routine installation of utilities and be of limited extent. Any relocation work would be required to comply with applicable ordinances, standards, and best practice requirements. Therefore, impacts would be less than significant.
(b) Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? L
ESS THAN SIGNIFICANT. Water would be used for the proposed Project primarily for the concrete pier foun - dations for the tubular steel poles. For an approximate foundation size of 8 feet in diameter and 35 feet deep, about 1,785 cubic feet of water would be required at each foundation. For Option 1, it is estimated that there would be approximately 40 poles. Option 2 would require approximately 32 poles but would NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.19. UTILITIES AND SERVICE SYSTEMS
SEPTEMBER 2024 5.19-6 ADMINISTRATIVE DRAFT MND/IS
also require concrete for underground duct banks and vaults. This water demand would be a one-time need.
Water may also be used for dust suppression, if necessary, during the 14 -month construction timeframe (for Option 1 only), although this would be a limited need. The volume of water required for dust control is not known. However, the amount of water for dust suppression during construction is considered to be nominal in comparison to available municipal water supply, and water use for construction would be periodic and temporary during the construction period.
Water trucks or hydrants would provide water for these activities as needed. Upon completion, the pro - posed Project would not generate any demand for water. Therefore, the proposed Project would have sufficient water supplies available to serve the Project and reasonably foreseeable future development during normal, dry and multiple dry years.
(c) Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
L
ESS THAN SIGNIFICANT. The proposed Project would generate minimal wastewater during construction.
Foundation drilling slurry for the installation of the tubular steel poles would be disposed of at an approved site away from the work area. The proposed Project would also require portable toilets for construction workers and the waste would be disposed of at appropriately licensed official facilities with adequate capacity. As discussed in Item (b) above, existi ng wastewater facilities would adequately accommodate the minor dema nd caused by Project construction while serving existing commitments. Therefore, this impact would be less than significant.
(d) Would the project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? L
ESS THAN SIGNIFICANT. Construction debris and waste generated during construction of the Project would be transported to staging areas for temporary storage or directly to a facility for recycling or disposal.
Existing wood poles removed as part of the Project would be moved to an area service center or staging area collection bin for transport with other materials for disposal at a licensed Class I or Class II landfill or a composite lined portion of a solid waste landfill. Total solid waste generated by construction of the proposed Project is anticipated to be minor compared to the capacity of local existing landfills, as identi - fied in Table 5.19 -2, Landfill Capacities. The landfills identified in Table 5.19 -2 are not expected to close for about another 20 years. During operation, the proposed Project would not be staffed and would not generate notable quantities of solid waste. Therefore, the impact of solid waste disposal on local infrastructure and landfill capacity would be less than significant. (e) Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
N
O IMPACT. The California Integrated Waste Management Act of 1989, which emphasizes resource con - servation through the reduction, recycling, and reuse of solid waste guide solid waste management requires that localities conduct a Solid Waste Generation Study (SWGS) and develop a Source Reduction Recycling Element (SRRE). The proposed Project would operate in accordance with these applicable Solid Waste Management Policy Plans by recycling materials where feasible. As identified in Table 5.19 -2, Landfill Capacities, the landfills serving the site would have sufficient capacity to accommodate Project construction solid waste disposal needs, and Project solid waste disposal would not result in the need for new or expanded landfill facilities. Therefore, the proposed Project would comply with federal, State, and local management and reduction statutes and regulations related to solid waste disposal limits and landfill capacities. No impact would occur.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.20. WILDFIRE
SEPTEMBER 2024 5.20-1 ADMINISTRATIVE DRAFT MND/IS
5.20. Wildfire
WILDFIRE
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Substantially impair an adopted emergency response plan or emer- gency evacuation plan?
☐ ☒ ☐ ☐
(b) Due to slope, prevailing winds, and other factors, exacerbate wild - fire risks, and thereby expose project occupants to pollutant con - centrations from a wildfire or the uncontrolled spread of a wildfire? ☐ ☐ ☒ ☐
(c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
☐ ☐ ☒ ☐
(d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
☐ ☐ ☒ ☐
Significance criteria established by CEQA Guidelines, Appendix G.
5.20.1. Setting
Wildland fire protection in California is the responsibility of the State, local, or federal government, depending on the location. The California Department of Forestry and Fire Protection (CAL FIRE) is required by law to map areas of significant fire hazards based on fuels, terrain, weather, and other relevant factors.
These zones, which are referred to as Fire Hazard Severity Zones (FHSZ), influence how people construct buildings and protect property to reduce risk associated with wildland fires. FHSZ maps identify the likelihood that an area will burn over a 30 to 50 -year period without considering that modifications may occur, such as fuel reduction efforts. Risk is not indicated by the maps. Risk is the potential damage that can be done by a fire, based on existing conditions. Risk can be reduced by various strategies, such as creation of defensible space, fuel load reduction, and, in the case of structures, the use of sprinklers and ignition-resistant building materials and construction. The City of Santa Clara is not located in a FHSZ in the CAL FIRE wildland fire hazard maps, primarily due to its urban conditions, flat terrain, and low fuel load (CAL FIRE, 2007). Fire protection within the City is discussed in Section 5.15 (Public Services).
Regulatory Background
Federal
A variety of transmission line and tower clearance standards are used throughout the electric transmission industry. Nationally, most transmission line owners follow the National Electric Safety Code (NESC) rules or ANSI guidelines, or both, when managing vegetation around transmission system equipment. The NESC deals with electric safety rules, including transmission wire clearance standards, whereas the applicable ANSI code deals with the practice of pruning and removing vegetation.
State and Local
California Public Utilities Commission (CPUC) General Order (GO) 95. CPUC’s GO 95 is the key standard governing the design, construction, operation, and maintenance of overhead electric lines in the State.
The CPUC has promulgated various Rules to implement the fire safety requirements of GO 95, including:
GO 95 Rule 31.2 requires that lines be inspected frequently and thoroughly to ensure that they are in good condition, and that lines temporarily out of service be inspected and maintained in such condition so as not to create a hazard.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.20. WILDFIRE
SEPTEMBER 2024 5.20-2 ADMINISTRATIVE DRAFT MND/IS
GO 95 Rule 35 governs requirements that vegetation management activities be performed in order to establish necessary and reasonable clearances.
GO 95 Rule 38 establishes minimum vertical, horizontal, and radial clearances of wires from other wires.
California Public Resources Code Sections 4294 and 4293. The California Public Resources Code (CPRC) Sections 4292 and 4293 specify requirements related to fire protection and prevention in transmission line corridors. CPRC Section 4292 states that any person that owns, controls, operates, or maintains any electrical transmission or distribution line has primary responsibility for fire protection of such areas, and shall maintain around and adjacent to any pole or tower which supports a switch, fuse, transf ormer, lightning arrester, line junction, or dead end or corner pole, a firebreak which consists of a clearing of not less than 10 feet in each direction from the outer circumference of such a pole or tower (CPRC 4292).
Power Line Fire Prevention Field Guide 2008 Edition. CAL FIRE, the state’s three investor-owned utilities (Pacific Gas and Electric [PG&E] Company, Southern California Edison Company, and San Diego Gas and Electric), and other California electric utilities have mutually developed a comprehensive field guide for their personnel. Its purpose is “to provide information and guidance to the personnel of the fire service agencies and electrical operators for minimum uniform application within the areas of their r espective jurisdiction and franchise responsibilities.” In addition to safety of the public, the guide details fire hazard reduction maintenance procedures for the safety of conductors and certain hardware.
PG&E's Public Safety Power Shutoff Program . The Public Safety Power Shutoff program was developed in cooperation with state utility regulators at the CPUC. A utility shuts off electricity on transmission and distribution lines in fire-prone areas during high fire-risk periods, including:
Red flag warning declared by the National Weather Service; Low humidity levels – generally 20% and below; and/or Forecasted sustained winds generally above 25 mph and wind gusts in excess of approximately 45 mph.
SVP operates and maintains the distribution and transmission grid inside the City, yet the larger trans - mission grid that brings most of SVP’s energy into the City is integrated throughout the State. Therefore, if large transmission lines are de-energized or constrained, then SVP may need to reduce load quickly to help the greater transmission grid. Depending on the severity of the event, it may mean power shutoffs or rolling outages in the City.
5.20.2. Environmental Impacts and Mitigation Measures
(a) Would the project substantially impair an adopted emergency response plan or emergency evacu- ation plan?
LESS THAN SIGNIFICANT WITH MITIGATION- CONSTRUCTION. The City of Santa Clara does not have an adopted emergency response plan or an emergency evacuation plan. The Project does not cross over or is not near any roads in a very high FHSZ nor would it require complete road closures. As stated in Section 5.17, Transportation, the Project may require brief temporary lane closures/disruptions, however, at least one lane of travel through each construction area would remain open throughout the construction period to accommodate roadway users (including emergency vehicles). During temporary lane closures, SVP would implement traffic control protocols and a project-specific traffic plan under Mitigation Measure T -1 (Construction Traffic Control Plan) to accommodate traffic flow. There is no other aspect of the Proposed Project, aside from traffic flow, that could impair an emergency response effort. Therefore, with incor - poration of mitigation, impacts from Project construction would not substantially impact emergency response or evacuation plans.
N
O IMPACT – OPERATIONS AND MAINTENANCE. Once operational, the proposed Project would have minimal impact on emergency response or evacuation. Occasional maintenance activities would be of short duration throughout the project area. While temporary lane closures are not anticipated, maintenance NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.20. WILDFIRE
SEPTEMBER 2024 5.20-3 ADMINISTRATIVE DRAFT MND/IS
vehicles or equipment may be temporarily present alongside the roadways depending on structure loca - tions and maintenance activities. However, at least one lane of travel would remain open at all times and any closure or disruption would be of limited duration (likely less than one day).
Option 1 would have a shorter duration of maintenance compared to Option 2, because overhead lines are easier to access. Additionally, Option 1 would have a shorter downtime in the event of a power outage or emergency, due to the visibility and accessibility of the line. However, the maintenance for both options would be of short duration and would be temporary. Therefore, maintenance of the proposed Project would not substantially impair an emergency response plan or emergency evacuation plan.
Mitigation Measures for Emergency Response
MM T-1 Construction Traffic Control Plan. [see full text in Section 5.17, Transportation] (b) Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
LESS THAN SIGNIFICANT - CONSTRUCTION. The project would not result in any occupied facilities and the City area is not located in a FHSZ as shown on CAL FIRE wildland fire hazard maps (CAL FIRE, 2007). However, there are residences in the Project vicinity located on Lafayette Street near the proposed transmission line route. Therefore, the following analysis focuses on the potential for Project construction and operation to increase the exposure of residences to wildfire risks.
During construction, Project-related activities have the potential to be a fire ignition source. Examples of ignition sources include improperly discarded smoking materials or sparks from welding or from metal striking metal or stone, igniting surrounding vegetation or other flammable materials. To reduce fire risk, SVP would implement standard fire prevention protocols. In addition, the proposed Project is located in a flat, urban environment without extensive easily ignited vegetation, and construction ac tivities would occur over a limited duration (14 months for Option 1). Impacts from wildfire risk during construction would be less than significant and no mitigation is required.
L
ESS THAN SIGNIFICANT – OPERATIONS AND MAINTENANCE. Electrical lines can start a fire if an object such as a tree limb, kite, or mylar balloon simultaneously contacts the power line conductors and a second object, such as the ground or a portion of the supporting pole or tower. System component failures and accidents during maintenance activities can also cause line faults that result in arcing on power lines. Power lines are also subject to conductor -to-conductor contact, which can occur when extremely high winds force two conductors to oscillate so excessively that they contact one another. This contact can result in arcing (sparks) that could ignite nearby vegetation. Aging, failing equipment increases the risk of system failures and faults.
The Project would update and install new electrical line equipment, reducing the risk of a system failure or line fault due to aging equipment. While the proposed Project would result in additional overhead electrical lines, the increase in risk of ignition associated with the additional line would be minimal relative to baseline conditions and the Project is not located in an area of high wildfire risk. Operation and main - tenance activities would be incorporated into SVP’s existing O&M schedule for its existing transmission lines, substations, and associated facilities. As with current operations and maintenance, SVP would com- ply with all current federal and State laws related to vegetation clearance and fire prevention, reducing wildfire risks. Impacts from wildfire risk during operations and maintenance would be less than significant and no mitigation is required.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.20. WILDFIRE
SEPTEMBER 2024 5.20-4 ADMINISTRATIVE DRAFT MND/IS
(c) Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? L
ESS THAN SIGNIFICANT. The proposed Project includes construction of a new transmission line. Most activi - ties associated with the proposed Project would occur along existing transmission line ROWs in an urban area and would rely primarily on existing paved roads for access. No fuel breaks or emergency water sources would be required. None of the new transmission lines would be within a wildfire risk area.
Operation and maintenance activities would be incorporated into SVP’s existing O&M schedule for its existing transmission lines, substations, and associated facilities. As with current operations and mainte- nance, SVP would comply with all current federal and State laws related to vegetation clearance and fire prevention. No additional infrastructure that has not been considered would be installed, and no additional fire risk impacts would occur because of operating and maintaining the Project. (d) Would the project expose people or structures to significant risks, including downslope or down - stream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? L
ESS THAN SIGNIFICANT. The P roject would not create occupied structures and thus could not expose residents to increased fire risk. The proposed Project is situated in an urban area with flat topography and low fuel load. During construction, there would be ground disturbance at the pole structure locations and, if sections of the line are buried, along the trench. T he proposed Project would use up to two staging areas, each approximately one acre, in areas that are already disturbed. As with current operations and maintenance, SVP would comply with all current regulations related to vegetation clearance and fire prevention. Given the low fire risk in a flat area with no known historic landslides or slope instability and the limited amount of surface disturbance proposed, the exposure of people or structures to risks as a result of runoff, post fire slope instability, or drainage changes would be less than significant.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.21. CORONA AND INDUCED CURRENT EFFECTS
SEPTEMBER 2024 5.21-1 ADMINISTRATIVE DRAFT MND/IS
5.21. Corona and Induced Current Effects
5.21.1. Environmental Setting
5.21.1.1. Corona
Corona is one of the phenomena associated with all energized electrical devices, including high voltage transmission lines. The localized electric field near a conductor can be sufficiently concentrated to ionize air close to the conductors. This can result in a partial discharge of electrical energy called a corona discharge, or corona. The corona effect is the physical manifestation of discharged electrical energy into very small amounts of sound, radio noise, heat, and chemical reactions with air components. It is a phenomenon associated with all energized electrical devices but is especially common with high-voltage power lines.
The amount of corona produced by a power line is a function of several factors, including line voltage, conductor diameter, conductor locations in relation to each other, condition of conductors and hardware, and local weather conditions including power line elevation above sea level. Corona typically becomes a design concern for 230 kV and higher power lines that are overhead (i.e., transmission lines on poles or towers). It is less noticeable for lines that are operated at lower voltages (i.e., subtransmission and distribution- sized lines). The electric field gradient is greatest at the conductor surface. Larger -diameter conductors have lower electric field gradients at the conductor surface and, therefore, lower corona noise than smaller- diameter conductors. The corona effect would not be a design concern for underground portions of power lines, regardless of voltage level, because the energized conductors are fully enclosed in a semi-conducting layer within insulated cables that serve to equalize the electrical gradient at the surface of the components.
5.21.1.2. Induced Currents
Electric currents can be induced in metallic objects located within the electric fields created by power lines. An electric current can flow when an object has an induced charge and a path to ground is present.
The amount of induced current that can flow is important to evaluate from a safety perspective because of the potential for electrical shocks to people and the possibility of electric arcs that could form across small gaps between conductive surfaces. These arcs can have the secondary effect of igniting flammable materials in the vicinity of the arc. In addition, induced currents are evaluated for their potential to lead to corrosion of metallic objects from the discharge of the induced current to ground.
From a safety perspective, the National Electrical Safety Code (NESC) specifies that transmission lines be designed to limit short circuit current from vehicles or large objects near the line to no more than 5 milliampere (mA). The NESC also addresses shock hazards to the public by providing guidelines on mini- mum clearances to be maintained for practical safeguarding of persons during the installation, operation, or maintenance of overhead transmission lines and their associated equipment.
5.21.2. Environmental Impacts and Assessment
Concerns about project interference with existing businesses and future development in the area were raised during scoping. The CEQA Guidelines do not provide significance criteria for evaluating impacts from corona or induced current effects. Corona and induced current from high voltage power lines can cause environmental impacts through:
Audible noise
Radio and television interference
Computer interference
Disturbance of cardiac pacemakers
Ignition of flammable materials
Corrosion of buried metallic objects
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.21. CORONA AND INDUCED CURRENT EFFECTS
SEPTEMBER 2024 5.21-2 ADMINISTRATIVE DRAFT MND/IS
The proposed Project involves construction of a new 115 kV transmission line, relocation of existing distri- bution power lines and/or telecommunication lines along some segments of the new 115 kV transmission line, and minor modifications at two existing substations affected by the Project. The audible corona noise level caused by the 115 kV power line was not quantified. However, circuits operating at 115 kV typic- ally cause noise at levels comparable to the ambient baseline noise levels in the vicinity of the line. Although the Proposed Project would be constructed to accommodate a 230 kV line, it would be operated at 115 kV.
If, in the future, the line was to be upgraded to 230 kV, corona may become a concern. The applicant has proposed to install corona rings on all insulators to prevent future corona impacts. Therefore, the impact of audible noise from the corona effect would be less than significant.
Although corona can generate high frequency energy that may interfere with broadcast signals or electronic equipment, this is generally not a problem for transmission or lower voltage power lines. The Institute of Electrical and Electronic Engineers (IEEE) has published a design guide (IEEE, 1971) that is used to limit conductor surface gradients so as to avoid corona levels that would cause electronic interference. Corona or gap discharges related to high frequency radio and television interference impacts are dependent upon several factors, including the strength of broadcast signals, and are anticipated to be very localized if they occur. Individual sources of adverse radio/television interference impacts can be located and corrected on the power lines. Conversely, magnetic field interference with electronic equipment such as computer monitors can be corrected through the use of software, shielding or changes at the monitor location. As a result, impacts from corona, radio/television interference, and magnetic field interference would be less than significant.
Induced currents and voltages on conducting objects near the proposed power lines would not pose a threat in the environment if the conducting objects are properly grounded. Project construction and operation would be done in accordance with SVP’s existing inspection and maintenance program and safety practices. Likewise, induced currents would not increase the risk of fuel ignition in the area.
The electric fields associated with high voltage transmission lines may be of sufficient magnitude to impact operation of a few older model pacemakers resulting in them reverting to an asynchronous pacing (IEEE, 1979). Substantial adverse effects would not occur with prolonged asynchronous pacing; periods of operation in this mode are commonly induced by cardiologists to check pacemaker performance. There- fore, while the transmission line’s electric field may impact operation of some older model pacemakers, the result of the interference would be of short duration and is not considered significant or harmful. No mitigation measures would be required or recommended.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-1 ADMINISTRATIVE DRAFT MND/IS
5.22. Mandatory Findings of Significance
MANDATORY FINDINGS OF SIGNIFICANCE Potentially
Significant
Impact
Less Than
Significant With
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
(a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a p lant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate impor- tant examples of the major periods of California history or prehistory?
☐ ☒ ☐ ☐
(b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effec ts of other current projects, and the effects of probable future projects.)
☐ ☒ ☐ ☐
(c) Does the project have environmental effects that would cause substantial adverse effects on human beings, either directly or indirectly?
☐ ☒ ☐ ☐
Significance criteria established by CEQA Guidelines, Appendix G. (a) Does the project have the potential to substantially degrade the quality of the environment, sub - stantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? L
ESS THAN SIGNIFICANT WITH MITIGATION. The proposed Project would be in a highly urbanized area of the City. Project components would be within existing substations in existing roads , or within or adjacent to the public right-of-way. Little vegetation would be affected. Some trees may be removed to accommodate poles and conductors, and other trees would be trimmed. Adjacent properties along the Project include maintained landscaping consisting of trees, shrubs, and grass. As described in Section 5.4, Biological Resources, there are no special-st atus plants or animals in the Project area due to the lack of habitat in such a highly urbanized environment. The Project is not expected to result in impacts to habitats that support sensitive species. However, some special-status birds may use the Project vicinity for foraging, although the habitat is marginal and the potential for occurrence of these species is very low. - Implementation of mitigation measures MM BIO-1 through MM BIO-5 would reduce these potential impacts to less than significant levels.
Similarly, Section 5.5 (Cultural Resources) and Section 5.18 (Tribal Cultural Resources) show that the Project would have a less than significant impact to important examples of the major periods of California history or prehistory. The records search indicates that no prehistoric cultural resources have been previously identified in the project area. However, as described in Section 5.5 (Cultural Resources) and Section 5.18 (Tribal Cultural Resources), the proposed Project could have an adverse effect on previously undiscovered cultural or tribal cultural resources. With implementation of mitigation measures MM CR1, MM CR-2, and MM TCR-1 for unanticipated discoveries of archaeological and historical resources or human remains- and mitigation measures MM G -2 for paleontological resources, impacts would be less than significant, and the Project would not eliminate important examples of major periods of California history or prehistory.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-2 ADMINISTRATIVE DRAFT MND/IS
(b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, effects of other current projects, and the effects of probable future projects.)
LESS THAN SIGNIFICANT WITH MITIGATION. CEQA defines a cumulative impact as an effect that is created as a result of the combination of the proposed Project together with other projects (past, present, or future) causing related impacts. Cumulative impacts of a project need to be evaluated when the project’s incre - mental effect is cumulatively considerable and, therefore, potentially significant. The proposed Project is planned for construction from November 2026 through March 2028. Once constructed, the Project would have little to no environmental impacts except for maintenance.
Two projects identified from the Planning Department’s current project list are within 0.25 miles of the proposed Project. The projects are in the application stage and were reviewed to identify whether the NRS-KRS project could contribute to cumulatively significant impacts when evaluated in combination with these projects. The projects are:
4220 Network Circle – Involving demolition of existing structures and r edevelopment of a 38-acre site near Lafayette Street and Montague Expressway with 584 housing units, open space, and parking.
Status as of May 2024: Pending Review.
960 Central Expressway – Involving demolition of existing warehousing and loading docks and construc- tion of three buildings for warehousing and/or datacenter uses. Status as of May 2024: Pending Review.
As discussed in Sections 5.1 through 5.21 potential impacts of the proposed Project would occur during construction, with few, if any, operational effects. Because the construction-related impacts of the Project would be temporary and localized, they would have the potential to combine with similar impacts of other projects only if they occur at the same time and in close proximity. The cumulative temporary and localized impacts of the construction of the proposed Project are considered by issue area below. The potential construction period for the two identified projects is unknown, as they have not yet undergone review and approval. Also, actual construction initiation and duration often varies from what is initially anticipated as a result of unforeseen circumstances including market conditions and availability of finan- cing among others. In the future, applications may be submitted for other unknown projects in the vicinity of the Project and may overlap with the Project construction period. Because the area is built out , any projects would be reconstruction or construction of replacement land uses on already occupied sites.
Given the built-out nature of the Project vicinity and the capacity of existing thoroughfares, there would be no post- construction impacts from the p roposed Project that would have the potential to combine with impacts from the projects listed.
The 4220 Network Circle application was filed in March 2024. To date, no hearings have been scheduled and CEQA review has not begun. If construction of the Network Circle proposed project were to coincide with that of the proposed NRS -KRS Project, both projects would use 4 -lane Layette Street and 6 -lane Montague Expressway for access to work areas. The Network Circle project site is close to Montague Expressway and construction related traffic using the Expressway to Lafayette Street would be on Lafayette Street for 500 feet from the west bound Expressway exit and 1,000 feet from the east bound exit. Thereafter, traffic would be within the project site on the former Agnew State Hospital property.
Construction traffic could also access the work site using Lafayette Street from the north. Construction of the NRS-KRS transmission line Project would be on Lafayette Street in the vicinity of the Network Circle project, and would be relatively short term – requiring installation of pole foundations approximately 350 feet apart, installation of tubular steel transmission poles, and stringing of conductor.
For the 960 Central Expressway project, the Notice of Preparation of an EIR and of a scoping meeting was published in December 2021. To date, the EIR has not been prepared. The Central Expressway proposed NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-3 ADMINISTRATIVE DRAFT MND/IS
project is proposed at the southwest corner of the intersection of Central Expressway and Lafayette Street, south of KRS. It is expected that construction related traffic for the Central Expressway project would be primarily on Central Expressway with some traffic on Lafayette Street. The NRS-KRS Project would enter KRS north of the Expressway with most of the Project south of Highway 101 within SVP property. It is unknown if the projects would overlap during construction.
Aesthetics. Potential views of the proposed Project are limited by the existing structures, walls, and vegetation along the alignment. NRS and KRS are behind screening walls and set back from nearby roads.
These facilities are already visual elements of the local urba n setting and viewscape, and the continued urbanization of the area is the likely trend for the foreseeable future with little change in its overall visual character. The impacts from the construction of the Project would be minimal because the work would be temporary in nature. The proposed Project represents only a relatively minor incremental change in cumulative conditions given the urban nature of the location and the presence of existing features similar to the proposed Project. Therefore, the Project’s visual effects are less than significant and are not considerable enough to represent a significant cumulative impact.
Agriculture and Forestry Resources. There is no agricultural activity at the site or any of the cumulative project sites. The Project would not contribute to cumulative impacts to agriculture and forestry resources.
Air Quality. Air emissions would occur during construction of the proposed Project. Emissions would include criteria air pollutants that could contribute to existing or projected violations of the ambient air quality standards for ozone and PM10. Other pollutants resulting from construction activities are accounted for in emissions inventories for regional air quality maintenance plans and would not impede attainment or maintenance of ambient air quality standards. Foundation excavation and other constructi on-related activities could potentially expose sensitive receptors to construction-related emissions, including emissions of fugitive dust and DPM, which could expose the receptors to increased health risk and hazards. These would occur only during construction and would be less than significant with implementation of mitigation measure MM AQ-1 (Implement Basic Construction Air Quality Mitigation). Any potential adverse cumula- tive air quality impacts would be short -term (lasting for the duration of construction) and would not be cumulatively considerable; therefore, the cumulative impact would be less than significant. The operation and maintenance emissions (e.g., limited vehicle use) would be less than the emissions during construc - tion activities and also less than the significance thresholds.
Concurrent construction of other projects in close proximity to the proposed Project would result in increased local air quality impacts for the duration of simultaneous construction activities. However, simul- taneous construction projects would also need to comply with BAAQMD rules and regulations regarding criteria pollutants. Any potential adverse cumulative air quality impacts would be short -term (lasting for the duration of construction) and would not be cumulatively considerable; therefore, the cumula tive impact would be less than significant.
Biological Resources. The proposed Project and the cumulative projects are located within an urbanized area and near busy roadways. The proposed Project area contains no habitat for special -status plant species and limited habitat suitable for most special -status wildlife species unless they are adapted to urban environments. However, if present within or adjacent to the proposed Project area, the proposed Project could result in direct or indirect impacts to special-status wildlife species. These impacts would be avoided or minimized with the implementation of Mitigation Measures (MMs) BIO-1 through BIO-5.
As described in Section 4 Project Description and in Appendix D, some vegetation and tree removal or tree trimming may be required for pole installation and vehicle access and to minimize the risk of fire by providing clearance between conductors and trees. Implementation of MM BIO-6 will ensure the proposed Project complies with the local policies and ordinances by following the tree protection requirements and recommendations of the City arborist.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-4 ADMINISTRATIVE DRAFT MND/IS
The Project would not represent a significant contribution to cumulative impacts. Given the built-up nature of the City, other cumulative projects in the vicinity have limited biological resources. Impacts to biological resources during operation and maintenance of the NRS -KRS Project would be less than significant, therefore, no contribution to cumulative impacts would occur.
Cultural Resources. There are no known historical or unique archaeological resources identified within the proposed Project area; however, previously unknown buried historical resources or human remains could be discovered and damaged, or destroyed, during ground disturbing work. Short-term construction activities and operation and maintenance activities would not significantly affect any unknown cultural or paleontological resources or human remains with the implementation of mitigation measures MM CR -1 (Worker Training and Management of Unanticipated Discoveries of Historical Resources, Unique Archaeo- logical Resources) and MM CR-2 (Treatment of Human Remains), as discussed in Section 5.5, Cultural Resources. No cultural resources would be affected during Project construction or during operation of the Project, and no contribution to cumulative impacts would occur.
Energy. Construction activities would consume nonrenewable energy resources to power construction equipment and vehicles. The short- term use of fuels by equipment and motor vehicle trips during con - struction would be necessary to install the transmission line. The energy used by the Project during construction and operation would not be wasteful, inefficient, or unnecessary considering the new facilities that would increase system reliability and pow er deliverability. The proposed Project would not conflict with any state or local plan for prioritizing renewable energy or energy efficiency, and there would be no considerable contribution to a cumulative impact associated with energy.
Geology and Soils. As discussed in Section 5.7, the proposed Project would be located in an area mapped as likely to experience strong ground shaking, including ground shaking that could result in liquefac tion- related phenomena. Projects in the vicinity of the NRS-KRS Project would also be located in areas mapped as likely to experience strong ground shaking potentially combining to expose people or structures to potential significant cumulative impacts. All construction would be required to comply with building code standards that take into account effects of seismic events. For the proposed Project, implementation of mitigation measure MM G-1 (Conduct Geotechnical Investigations), which would ensure that Project design would reduce the potential for geologic and seismic hazards, such as liquefaction and expansive soils. The Project would not increase potential risks associated with seismic events or other geologic hazards. Short- term construction impacts to soils, including unstable so ils, have the potential to occur; however, final geotechnical recommendations would reduce the impacts to a less than significant level and the proposed Project impacts are not considerable enough to represent a significant cumulative impact. Adherence to similar design and engineering standards, which are applicable to the identified cumulative projects, ensure that their cumulative impacts to geology and soils would also be less than significant.
There is a limited potential for paleontological resources to occur on the site. Mitigation measure MM G-2 (Work Training and Management of Unanticipated Discoveries of Paleontological Resources) would ensure any potential impacts are less than significant and would not contribute to a cumula tively considerable impact.
Greenhouse Gas Emissions. Because the direct environmental effect of GHG emissions is to influence global climate change, GHG emissions are by their nature inherently a cumulative concern with a cumula- tively global scope. Project-specific GHG emissions would occur from the burning of fuels required by construction equipment and vehicles during construction activities. Primary GHG emissions during con - struction are associated with CO
2 from the combustion of gasoline and diesel fuel in equipment and vehicles. CH4 and N2O are also emitted from fuel combustion but at rates of less than 1 percent of the mass of CO2 combustion emissions. Construction-related emissions would be distributed over 14 months (for Option 1). These estimated levels would not exceed the threshold level of 25,000 metric tons per year for annual mandatory reporting of GHGs.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-5 ADMINISTRATIVE DRAFT MND/IS
GHG emissions from operation and maintenance would be minimal, as the transmission line would require only infrequent maintenance. The minor quantity of GHG emissions created during construction and for operation and maintenance would not be a cumulatively considerable impact.
Hazards and Hazardous Materials. The use of hazardous materials for the Project would be minimal during construction and operation. Hazardous materials would be stored and used in compliance with applicable regulations. Minor spills or releases of hazardous materials could occur due to up set or improper handling and/or storage practices during construction activities. Impacts from routine use, transportation, disposal, and accidental spillage of hazardous materials would be reduced to a less than significant level with implementation of mitigation measure MM HM-1 (Hazardous Substance Control and Emergency Response) discussed in Section 5.9, Hazards and Hazardous Materials; no contribution to cumulative impacts would occur.
Hydrology and Water Quality. The Project would not change existing drainage patterns along the route, which is covered primarily with impervious surfaces. The proposed Project would require minimal water for dust control and concrete during construction. Dewatering during foundation excavation for poles is possible, but not anticipated. In the event that dewatering is necessary, the water would be pumped out and treated and encountered groundwater would be tested to meet requirements set by the Regional Water Quality Control Board (RWQCB). Implementation of Mitigation measures MM HYD -1 (SWPPP or Erosion Control Plan Development and Implementation) and MM HM-1 (Hazardous Substance Control and Emergency Response) would ensure that erosion, sedimentation, or an accidental spill would not signifi- cantly affect water quality. With imple mentation of this mitigation, the Project’s hydrology and water quality impacts are less than significant and are not considerable enough to represent a significant cumulative impact.
Land Use. The proposed Project would be consistent with the policies of the City General Plan. In addition, the proposed Project, as well as the cumulative projects, are required to minimize any impacts to state and federally listed species and/or habitats through c ompliance with CEQA, the federal ESA, the CESA, and/or applicable local habitat conservation plans. The Project would, therefore, not conflict with applica- ble land use policies and regulations and would not contribute to cumulative impacts to land use.
Mineral Resources. No commercial mineral resources are known to exist within the proposed Project site or vicinity. Therefore, the proposed Project would not result in the loss of availability of a known mineral resource. The Project would not contribute to potential cumulative impacts that may result in the loss of mineral resources.
Noise. The proposed Project is not expected to contribute to a long-term cumulative impact on ambient noise levels in the area. Noise from construction activities would be audible to nearby residents and businesses, but construction would be limited to daytime hours and would be short -term. The nearest sensitive receptors, residents, are located just over 100 feet from the proposed transmission line route at their nearest. It is assumed that the cumulative projects would also be constructed during daytime. There would be a limited potential for the projects to have overlapping construction schedules for an extended duration that could result in substantial levels of combined construction noise. These projects are not likely to combine with noise generated from the construction of the Project to create significant adverse effects since noise reduces rapidly with distance.
Population and Housing. The proposed Project would not result in impacts to population and housing.
During its construction, the Project would provide short-term jobs for a small workforce. Construction workers would be contracted workers from the region. These jobs are not anticipated to result in workers relocating to the area. The Project would not displace any existing hous ing or people. The proposed Pro- ject, combined with the cumulative projects will have the potential to increase the population in the area due to increased job or housing opportunities. The proposed Project itself can facilitate future planned growth by ensuring a reliable and flexible electricity grid in the area. While the development of these NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-6 ADMINISTRATIVE DRAFT MND/IS
properties may induce some population growth, this has already been accounted for through the General Plan for the City. The NRS -KRS Project is proposed to increase system reliability and to serve planned growth in the area. The Project’s population and housing impacts would be less than significant and are not considerable enough to represent a significant cumulative impact.
Public Services. The proposed Project would not interrupt fire or police protection services, schools, access to public parks, or other public facilities nor would it require the construction of new public service facilities. The completion of the projects in the vicinity may have the potential to also increase the demand for public services and public facilities, including schools, parks, and fire and police protection. However, impacts from the proposed Project on public services would be incremental and would not contribute to a cumulatively significant impact.
Recreation. Although some workers may use nearby park facilities during Project construction; increased use would be minimal and temporary and would not contribute substantially to the physical deterioration of existing facilities. The cumulative projects also have the potential to increase use of park facilities, but the increased use would also be minimal. The projects would have less than significant effects on recreation and would not contribute to cumulative effects associated with other projects.
Transportation. Construction would occur in a highly urbanized setting and would therefore create temporary impacts to traffic volumes, road hazards, and emergency access in the project area. Some road closures and/or one-way traffic controls would be required to allow for certain construction activities and to maintain public safety. While construction would create impacts, these impacts would be localized, temporary in nature, and would not change long-term traffic loads or patterns. Impacts due to traffic and temporary lane closures as a result of the construction of the proposed Project would be reduced to a less than significant level with implementation of mitigation measure MM T1 (Construction Traffic Control Plan) discussed in Section 5.17, Transportation and Traffic.
Impacts from the proposed Project, combined with construction of the cumulative projects would have the potential to cum ulatively impact transportation and traffic in the surrounding area; however, the construction schedules of the Projects and that of the proposed Project would be variable. The potential for the planned and current projec ts in the vicinity to require lane closures simultaneously would be a remote possibility and would be limited in duration and location. Adherence to mitigation measure MM T-1 (Construction Traffic Control Plan) would ensure that the proposed Project’s cumulative impacts to traffic and transportation would be incremental, short-term, and less than significant.
Tribal Cultural Resources. There are no known Tribal Cultural Resources (TCRs) listed in, or are known to be eligible for listing in, the California Register of Historical Resources (CRHR) or local register of historical resources within the proposed Project site or surrounding ar ea. However, it is possible that pre viously unidentified TCRs that may be eligible for inclusion in the CRHR or local registers could be discovered and damaged, or destroyed, during ground disturbance, which would constitute a significant impact absent mitigation. Implementation of mitigation measure MM TCR -1 (Management of Unan ticipated Tribal Cultural Resources), discussed in Section 5.18 (Tribal Cultural Resources), would ensure evaluation and protection of unanticipated TCR discoveries. Adherence to this mitigation measure would ensure that no tribal cultural resources would be affected during Project construction or during operation of the Project, and no contribution to cumulative impacts would occur.
Utilities and Service Systems. The construction of the proposed Project would generate minimal demand for water or wastewater treatment. Construction would require the disposal of a less than significant amount of all types of waste. No expanded utility facilities or services would be needed for the Project and use and disposal of all water and waste products would comply with all applicable laws and regulations. Operation and maintenance of the proposed Project would not require any dema nd for water or wastewater treatment. Therefore, a less than significant contribution to cumulative impacts to utilities and service systems would occur.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 5.22. MANDATORY FINDINGS OF SIGNIFICANCE
SEPTEMBER 2024 5.22-7 ADMINISTRATIVE DRAFT MND/IS
Wildfire. The construction of the Proposed Project would require temporary lane closures. The potential for the planned and cur rent projects in the vicinity to require lane closures simultaneously would be a remote possibility and would be limited in duration and location. Implementation of MM T- 1 (Construc- tion Traffic Control Plan) would ensure that at least one lane of travel would remain open. Since the Proposed Project is not located in or near a very high fire hazard severity zone and is in an urban area with flat topography and low fuel load, the risk of wildfire is low. Furthermore, the Proposed Project would be unstaffed and would require only occasional maintenance with a small crew. The Proposed Project would be installing new electrical line equipment, which would reduce the risk of system failure due to aging equipment, which would reduce the cumulative fire risk for the area. Therefore, a less than significant contribution to cumulative impacts to wildfire would occur.
Corona and Induced Current Effects. None of the planned or current projects in the vicinity of the proposed Project would be sensitive to corona or induced current effects. The proposed Project will not contribute to a cumulative impact to corona and induced current effects. (c) Does the project have environmental effects, which would cause substantial adverse effects on human beings, either directly or indirectly?
L
ESS THAN SIGNIFICANT WITH MITIGATION. The proposed Project would not substantially adversely affect human beings directly or indirectly. The Initial Study identified no environmental effects that would cause substantial adverse effects on human beings. Adverse effects would be mitigated by implemen tation of mitigation measures and, in most instances, would be short -term construction period impacts. Each type of impact with the potential to cause substantial adverse effects on human beings has been evalu - ated, and this Initial Study concludes that all of these potential impacts are either less than significant or can be mitigated to a less than significant level with the implementation of measures presented herein. (See Section 6, Mitigation Monitoring and Reporting Program, for a complete listing of the mitigation measures.) Therefore, the proposed Project does not involve any activities, either during construction or operation, which would cause significant adverse effects on human beings that cannot be readily miti - gated to a less than signi ficant level. The proposed operation and maintenance activities would be the same as current operation and maintenance practices for the existing substations and existing SVP trans- mission lines, which have minimal impacts on human beings. The potential beneficial effects of the project include improving the reliability and capacity of the existing transmission system in the City.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-1 ADMINISTRATIVE DRAFT MND/IS
6. MITIGATION MONITORING PLAN
This Mitigation Monitoring and Reporting Program (MMRP) will be used by the City of Santa Clara and SVP to ensure that the mitigation measures adopted as a condition of project approval are implemented.
The MMRP is consistent with CEQA Guidelines (Sections 15074(d), 15091(d), and 15097) for the implementation of mitigation.
SVP will be responsible for monitoring the implementation of the mitigation measures presented in Table 6-1. SVP will designate specific personnel to implement and document all aspects of the MMRP. SVP will ensure that the designated personnel have authority to enforce mitigation requirements and will be capable of terminating Project construction activities found to be inconsistent with mitigation objectives.
Additionally, SVP will be responsible for ensuring that construction personnel understand their respon - sibility to adhere to the MMRP requirements and other contractual requirements related to the implementation of mitigation.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-2 ADMINISTRATIVE DRAFT MND/IS
Table 6-1. Mitigation Monitoring Plan
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
Air Quality
Construction-
Phase Air
Quality
MM AQ -1. Implement Basic Construction Air Quality Mitigation. The Project shall ensure that basic construction emissions control measures are implemented as “Best Management Practices,” as follows:
All exposed soil surfaces (e.g., parking areas, staging areas, soil piles, and graded areas) shall be watered two times per day.
All haul trucks transporting soil, sand, or other loose material off-site shall be covered. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. All areas to be paved shall be completed as soon as possible. Foundation pads shall be laid as soon as possible after grading.
Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage regarding idling shall be provided for construction workers at all access points. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.
Post a publicly visible sign with the telephone number and person to contact at SVP regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD’s phone number shall also be visible to ensure compliance with applicable regulations.
Emissions from
construction equip-
ment exhaust are
reduced
During
construction
Biological Resources
Special Status
Wildlife Species
MM BIO-1. Implement Worker Environmental Awareness Program. Prior to and for the duration of any vegetation removal and trimming and any ground disturbing activities, SVP or its designee shall provide Worker Environmental Awareness Program (WEAP) training to all new personnel prior to beginning work on the Project. The training may be presented in the form of a video. The training program shall be developed by a qualified biologist to educate Project personnel about the Pro ject’s sensitive biological resources. The name and credentials of the qualified biologist shall be submitted to the City no less than 14 days prior to the surveys for review and approval. A draft of the training program (i.e., video and written materials) shall be submitted to the City no less than 14 days prior for approval prior to imple - mentation. The WEAP shall include, at a minimum:
Monitor
implementation of
specified biological
monitor activities
Prior to and
during
construction
Special Status
Wildlife Species
MM BIO-2. Biological Monitoring. SVP or its designee shall retain a qualified biologist as biological moni- tor on the Project, to be approved by the City. If sensitive biological resources are identified during preconstruction surveys or incidentally, the qualified biologist will monitor Project work locations in proxi- mity to sensitive biological resources weekly until biological resources are not found for one consecutive month, at which point weekly monitoring will cease. The qualified biologist shall be notified immediately if any nesting birds or other biological resources are discovered once construction begins. The qualified Monitor sensitive
biological resources
if identified during
preconstruction
survey
Prior to and
during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-3 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
biologist will be the point of contact for any employee or contractor who might inadvertently kill or injure a special-status species or anyone who finds a dead, injured, or entrapped animal. The qualified biologist or biological monitor shall have the authority and responsibility to halt any Project activities that are not in compliance with applicable mitigation measures, permit conditions, or other Project requirements, or will have an unauthorized adverse effect on biological resources.
Special Status
Wildlife Species
MM BIO -3. Conduct Preconstruction Surveys for Special -Status Wildlife and Implement Avoidance Measures. A qualified biologist shall conduct a preconstruction survey for each of the species identified below. These surveys can be combined if they meet the requirements outlined in this measure. The name and credentials of the qualified biologist shall be submi tted to the City no less than 14 days prior to the surveys for review and approval. Within 14 days of completion of the surveys, the City shall be provided with a report describing the findings, including the date, time, and duration of the surveys; identity of the surveyor(s); a list of all common and special -status species observed; locations of any special -status species identified, including any established avoidance buffers; and any actions taken at the direction of the City in coordination with CDFW, and/or USFWS.
Bumble Bee: A preconstruction survey for Crotch’s bumble bee and western bumble bee shall be con- ducted during the colony active period for each species (April through August) prior to project vegetation management and ground disturbing activities. The survey shall be conducted by a qualified entomologist or biologist familiar with the life history an d ecology of special -status bumble bee species. The precon - struction survey for special-status bumble bees shall focus on the ruderal habitat within the utility right - of-way adjacent to the Northern Receiving Station and landscaped and ruderal land at the Montague Expressway interchange. The survey shall identify any potential foraging, nesting, and/or overwintering resources present within the Project work are as and a 50-foot buffer where legal access is available. If a potential active special-status bumble bee nest site is identified, a 50-foot avoidance buffer shall be clearly delineated with staking, flagging, and/or signage and Project activities will be p rohibited from the area until it is determined that the nest is no longer potentially active. The qualified biologist shall notify the City for coordination with CDFW within 24 hours as further coordination may be required to avoid or mitigate impacts.
Burrowing Owl. No later than seven days prior to start of project vegetation management and ground disturbing activities, a qualified biologist shall conduct a preconstruction survey for burrowing owl. The survey shall include the focus areas (described below) plus a 25 0-foot buffer where legal access is avail - able. The survey for burrowing owl shall focus on the ruderal habitat described for bumble bees above. If burrows or other structures are identified that contain signs of use by burrowing owl, or if burrowing owl(s) is observed, an avoidance buffer area shall be clearly delineated with staking, flagging, and/or signage. If during the nesting season (February 1 to August 31), a 250-foot avoidance buffer shall be estab- lished, and Project activities will be prohibited from the area until a qualified biologist deter mines it is occupied either by a non-mated pair or the young have fledged. If outside the nesting season, a 160-foot avoidance buffer shall be established. The prescribed buffers may be adjusted by the quali fied avian biologist in coordination with the City and CDFW based on existing conditions around the burrow, planned construction activities, tolerance of the species at a given location, and other pertinent factors.
If avoidance of burrowing owls is not feasible and work will be conducted outside the nesting season, a Burrowing Owl Passive Relocation Plan shall be developed to provide detailed methods and guidance for passive relocation of burrowing owls. The Burrowin g Owl Passive Relocation Plan shall be submitted to Monitor
implementation of
specified biological
monitor activities
and implement
avoidance measures
Prior to and
during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-4 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
the City for approval in coordination with CDFW prior to conducting passive relocation. An occupied burrow may not be disturbed during the nesting season, unless a qualified biologist determines, by non - invasive methods, that it is not occupied by a mated pair. Passive relocation would include installation of one-way doors on burrow entrances that would let owls out of the burrow but would not let them back in. Once owls have been passively relocated, burrows will be carefully excavated by hand and collapse d by, or under the direct supervision, of a qualified biologist.
Within 14 days of completion of the surveys, the City shall be provided with a report describing the findings, including the date, time, and duration of the surveys; identity of the surveyor(s); any established avoidance buffers in the event burrowing owls are documented to be present; and any actions taken at the direction of the City and/or CDFW.
Western Pond Turtle: No later than seven days prior to start of project vegetation management and ground disturbing activities, a qualified biologist shall conduct a preconstruction survey for western pond turtle. The survey for western pond turtle shall focus on the ruderal habitat within the utility right-of-way southeast adjacent to the Northern Receiving Station.
Western pond turtle or other special-status wildlife found within the Project site during the surveys shall be allowed to leave on its own volition prior to the onset of construction. If species of special concern are found within the Project site during s urveys and will not leave on its own volition, the species will be relocated to the nearest suitable habitat outside of the Project site. Species of special concern will only be handled by qualified personnel as authorized by CDFW and/or USFWS under an issued state scientific collecting permit (SCP), memorandum of understanding (MOU), or federal recovery permit. Impacts to federally or state -listed species or state -listing candidate species are not authorized. If any State or federally listed, candidate, or proposed species are detected work will be stopped and the applicant shall notify the City for coordination with CDFW and or USFWS, within 24-hours for further direction.
Special Status
Wildlife Species
MM BIO -4. Preconstruction Nesting Bird Surveys and Nest Protection. During the nesting season (February 1 to August 31) If Project-related work is scheduled during the nesting season (typically February 15 to August 30 for small bird species such as passerines; January 15 to September 15 for owls; and February 15 to September 15 for other raptors) , preconstruction nesting bird surveys shall be conducted on the site and vicinity by a qualified biologist no more than 7 days before any work activities, including any vegetation removal or trimming, are performed at a given Project location. The surveys shall be conducted following the sequential schedule of the linear Project in a manner that minimizes potential for the surveys to expire before the construction crews proceed to a new Project work location. The survey radii surrounding the work area shall be 250 feet for passerines and 500 feet for raptors. Surveyors will search for all potential nest types (e.g., ground, cavity, shrub/tree, structural, etc.) and determine whether the nest is active. A nest will be determined to be active if eggs or young are present in the nest. Upon discovery of active nest s, the biological monitor will determine if there is need for a buffer or shield to minimize disturbance of the nest. Upon this deter mination and execution of any required minimization action, work may proceed. The extent of the determination will be based upon: acclimation of the species or individual to disturbance, nest type (cavity, tree, ground, etc.), and level and duration of construction activity. If there is a break in construction at a work location for a period of 14 or more days during nesting season, a new nesting bird survey shall be undertaken before construction is allowed to commence at that location to determine if any nests have been established. Bird surveys are not required outside of the nesting season.
Monitor
implementation of
measures to protect
nesting bids
During nesting
season; prior
to and during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-5 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
In the unlikely event a special -status or listed species is found nesting nearby, CDFW and USFWS will be notified, and the City will be provided with nest survey results, if requested. When active nests are identified, monitoring for significant disturbance to the birds will be implemented. Construction will not be allowed to continue unless the qualified biologist determines that no disturbance is occurring.
Special Status
Wildlife Species
MM BIO-5. Preconstruction Bat Survey and Implement Avoidance Measures. A qualified biologist shall conduct surveys for special -status bats during the appropriate time of day to maximize detectability to determine if bat species are roosting in trees or other vegetation requiring removal or clearance pruning for the Project. The name and credentials of the qualified biologist shall be submitted to the City no less than 14 days prior to the surveys for review and approval. The survey shall occur no less than 7 days and no more than 14 days prior to beginning tree or other vegetation removal or trimming activities. Survey methodology may include visual surveys for bats (e.g., observation of bats emerging from roosts to forage), inspection for suitable roost hab itat, bat sign (e.g, guano), or use of ultrasonic detectors (e.g., Anabat, etc). Visual surveys shall include all trees or other vegetation requiring removal or clearance pruning for the Project.
If evidence of bat use is observed, the approximate number and species of bats using the roost shall be determined. Bat detectors may be used to supplement survey efforts.
If roosts or a maternity colony are determined to be present, then a Bat Mitigation and Monitoring Plan (Plan) shall be prepared and implemented to mitigate for the loss of roosting habitat. The Plan shall include information pertaining to the species of bat and location of the roost, exclusion methods and roost removal procedures, compensatory mitigation for permanent impacts (including specific mitigation ratios and location of proposed mitigation) and monitoring to assess bat use of mitigation areas. This Plan shall be submitted to the City and CDFW for review and approval prior to project activities that could disturb roosting bats.
Monitor
implementation of
bat survey and
avoidance measures
Prior to and
during
construction
Compliance with
Local Tree Policies
and Ordinances
MM BIO-6. Tree Protection Measures for Retained Trees. To minimize the potential damage and ensure the long-term health, stability, and survival of retained trees, measures outlined in the Tree Protection Plan below shall be implemented:
Tree Protection Zone
A Tree Protection Zone (TPZ) shall be defined by the City Arborist or City designated ISA Certified Arborist for all trees within 50 feet of any excavations that could be affected by project activities and are intended for preservation. A TPZ will not be established for trees within the Project area that are not within this excavation zone. TPZ will be taken down once excavation work is completed within 50 feet. A TPZ will typically include all area within the dripline of trees to be retained. The TPZ will be protected by a fenced enclosure to prevent unauthorized access during project activi - ties. Fencing shall be constructed of sturdy but open material (i.e., orange webbed construction fencing, chain-link) with a minimum height of 4 feet and secured in place. Warning signs (e.g. WARNING – Tree Protection Zone – This fence shall not be moved without approval by the City Arborist or a City designated arborist) shall be prominently displayed and visible from all sides of the TPZ fencing. TPZ fencing shall be installed prior to any demolition, grading, staging, stockpiling, or any other con- struction activities, and shall remain in place until all construction activities are complete.
Monitor
implementation of
tree protection
measures
Prior to and
during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-6 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
No construction, staging, or storage of materials, equipment or vehicles shall occur within the TPZ with- out advanced approval and oversight by the City Arborist or a City designated ISA Certified Arborist. No excess soil, excess concrete or concrete wash, chemicals, refuse or other waste shall be placed within the TPZ.
The primary contractor shall be responsible for maintaining TPZ fencing and enforcing all TPZ guidelines outlined above throughout the course of the Project.
Site Grading, Excavation, and Trenching
Soil disturbance or grade changes within a TPZ are not permitted unless approved by the City Arborist or a City designated arborist. Any approved grading, excavation or trench work within a TPZ will be field staked and inspected by the City Arborist or a C ity designated ISA Certified Arborist prior to implementation.
All grading, excavation and trenching work within a TPZ shall be performed under the observation of a City Arborist or City designated ISA Certified Arborist. All grading shall be designed to provide positive drainage away from the base of trees to be preserved and shall not create ponding within a TPZ.
Grade changes in the vicinity of trees to be preserved should remain as close to natural grade as possible.
Canopy Pruning
To the extent possible, any necessary canopy pruning shall be completed prior to the commencement of construction activities.
Pruning shall be performed by a qualified tree service worker under the direction of a ISA Certified Arborist following International Society of Arboriculture tree pruning best management practices.
Pruning shall not be performed by construction personnel.
Root Pruning
Any roots one inch and larger requiring removal shall be cut cleanly in sound tissue. No pruning seals or paint shall be used on wounds.
Roots two inches and greater shall remain in place and undamaged to the extent practicable. If removal is required, cuts shall be made with the approval and under the direction of an ISA Certified Arborist.
Communication for Tree Protection Compliance
A preconstruction meeting shall be arranged for the City Arborist or City designated ISA Certified Arborist to meet with the Project Planner, Project Contractors, Onsite Project Supervisors, Tree Pruning and Removal Contractor, and/or other appropriate Project Leads to review and secure a commitment to comply with all tree protection measures.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-7 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
Cultural Resources
Unanticipated
Discoveries of
Historical
Resources or
Unique
Archaeological
Resources
MM CR-1. Worker Training and Management of Unanticipated Discoveries of Historical Resources, Unique Archaeological Resources. SVP shall conduct a worker environmental awareness program (WEAP) for Project personnel who, during the course of Project work, might encounter or alter historical resources or important/unique archaeological materials. This program may be combined with a ny similar required program, such as for biological resources. The WEAP may include a kickoff tailgate session that describes how to identify cultural resources and what to do if an unanticipated dis covery is made during construc- tion, presents site avoidance requirements and pro cedures to be followed if unantici pated cultural resources are discovered during Project construction, and includes a discussion of disciplinary and other actions that could be taken against persons violating historic preservation laws and SVP policies.
If previously unidentified cultural resources are identified during con struction, construction work within 100 feet of the find shall be halted and directed away from the discovery until a Secretary of the Interior qualified archaeologist assesses the significance of the resource. The archaeologist, in consultation with the City of Santa Clara, State Historic Preservation Officer, any interested Tribes, and any other respon - sible public agency, shall make the necessary plans for treatment of the find(s) and for the evaluation and mitigation of impacts if the finds are found to be eligible to the National or California Registers, qualify as a unique archaeological resource under California Environmental Quality Act Section 21083.2, or are determined to be tribal cultural resource as defined in Section 21074.
Review and attend
worker
environmental
awareness program;
Monitor implemen-
tation of
unanticipated
discovery protocols
Prior to
construction
and during
construction
Unanticipated
Discoveries of
Human Remains
MM CR-2. Treatment of Human Remains. Any human remains discovered are to be treated with respect and dignity. Upon discovery of human remains, all work within 50 feet of the discovery area must cease immediately, nothing is to be disturbed, and the area must be secured. The Santa Clara County Coroner’s Office must be called. The Coroner has two working days to examine the remains after notification. The appropriate land manager/owner of the site is to be called and informed of the discovery. If the remains are located on federal lands, federal land managers, federal law enforcement, and the federal archaeo - logist must be informed as well, due to comple mentary jurisdiction issues. It is very important that the suspected remains, and the area around them, are undisturbed and the proper authorities called to the scene as soon as possible, as it could be a crime scene. The Coroner will deter mine if the remains are archaeological/ historic or of modern origin and if there are any criminal or jurisdictional questions.
After the Coroner has determined the remains are archaeological/historic -era, the Coroner will make recommendations concerning the treatment and disposition of the remains to the person responsible for the excavation, or to his or her authorized representative. If the Coroner believes the remains to be those of a Native American, he/she shall contact the Native Amer ican Heritage Commission (NAHC) by tele- phone within 24 hours.
The NAHC will immediately notify the person it believes to be the most likely descendant (MLD) of the remains. The MLD has 48 hours to make recommendations to the landowner for treatment or disposition of the human remains. If the descendant does not make recommendations within 48 hours, the land - owner shall reinter the remains in an area of the property secure from further disturbance. If the landowner does not accept the descendant’s recommendations, the owner or the descendant may request mediation by NAHC.
According to the California Health and Safety Code, six (6) or more human burials at one (1) location constitute a cemetery (Section 8100), and willful disturbance of human remains is a felony (Section 7052).
Monitor
implementation of
human remain
discovery protocols
During
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-8 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
Geology and Soils
Geologic and
Seismic Hazards
MM G-1. Conduct Geotechnical Investigations. Because seismically induced liquefaction-related ground failure has the potential to damage or destroy Project components, SVP shall cause design-level geotech- nical investigation for the Project to be performed that shall include investigations designed to assess the potential for geologic and seismic hazards, and specifically include evaluation of the potential for lique - faction and expansive soils to affect the 115 kV line structures. Where liquefaction or expansive soils hazards are found to exist/verified, appropriate engineering design and construction measures shall be incorporated into the Project design as deemed ap propriate by the Project engineer. Finalized Project design incorporating geotechnical recommendations shall be submitted to the City 60 days prior to Project construction.
Ensure a design-level
geotechnical
investigation is
performed
At least 60
days before
final Project
design
Unanticipated
Discoveries of
Paleontological
Resources
MM G -2. Worker Training and Management of Paleontological Resources. A paleontologist must be retained who meets the professional paleontologist qualifications (Society of Vertebrate Paleon tology’s Standard Procedures, 2010) and has demonstrated experience in carrying paleon tological projects to completion. The qualified professional paleontologist shall prepare a Worker Environmental Awareness Program (WEAP) for potentially encountered paleontological resources, and training shall be provided for all staff who will be onsite during excavations. The WEAP shall show what local Pleistocene fossils look like in general, where they may appear in the Project, and how to proceed should material suspected to be a fossil is encountered.
The WEAP shall include procedures to follow if paleontological resources are encountered, including:
A monitoring plan for soils generated from tubular pole foundation excavations that may encounter Pleistocene sediments. Workers may temporarily halt operations to allow for identification and collec- tion of paleontological resources from soil spoil piles. If a potential significant paleontological resource is noted, a qualified paleontologist or paleontological monitor shall be called to the site identify and collect the fossil.
A plan for treatment of significant fossils that provides for the treatment of specimens to the point of identification and permanent preservation, including washing of sediments to recover small inverte - brates and vertebrates.
A specimen identification, analysis, and curation plan that includes identification to the lowest taxono- mic level possible; taxonomic, taphonomic, and biostratigraphic analysis; and curation to the standards of the repository where they will be curated.
Paleontological resource collection treatment, and identification shall meet standards set forth in the Society of Vertebrate Paleontology (2010).
Review
Paleontological
Resource Monitoring
Program; Monitor
implementation of
Program
Prior to
construction
and during
construction
Hazards and Hazardous Materials
Hazardous
Substances
Control
MM H -1 Hazardous Substance Control and Emergency Response. SVP shall implement its hazard ous substance control and emergency response. procedures as needed. These procedures identify methods and techniques to minimize the exposure of the public and site workers to potentially hazardous materials during all phases of Project construction through operation. They address worker training appropriate to the site worker’s role in hazardous substance control and emer gency response. The procedures also require implementing appropriate control methods and approved containment and spill-control practices for construction and materials stored on site. If it is necessary to s tore chemicals on site, they shall be Collect and analyze
soil samples and, if
contamination is
discovered, ensure
that construction
activities are con-
ducted according to
Prior to
construction
and during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-9 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
managed in accordance with all applicable regulations. Material safety data sheets shall be maintained and kept available on site, as applicable.
All hazardous materials and hazardous wastes shall be handled, stored, and disposed of in accord ance with all applicable regulations, by personnel qualified to handle hazardous materials. The hazardous substance control and emergency response procedures include, but are not limited to, the following:
Proper disposal of potentially contaminated soils resulting from leaks or spills. Establishing site -specific buffers for construction vehicles and equipment located near sensitive resources.
Emergency response and reporting procedures to address hazardous material spills. Stopping work at that location and contacting the City Fire Department Hazardous Materials Division immediately if visual contamination or chemical odors are detected. Work will be resumed at this location after any necessary consultation and approval by the Hazardous Materials Division. SVP shall complete its Emergency Action Plan Form as part of Project tailboard meetings. The purpose of the form is to gather emergency contact numbers, identify first aid locations and provide other tailboard safety information.
SVP’s hazardous
substance control
and emergency
response procedures
Contaminated
Soil and
Groundwater
MM H-2 Soil and Groundwater Management. Prior to Project construction and ground disturbing activi- ties, SVP shall implement an evaluation of potential soil and groundwater contamination at locations along the Project route where excavation, drilling, auguring, or other significant ground disturbance will occur to prevent mobilization of contaminants and exposure of workers and the public.
The evaluation shall be completed at least 60 days prior to the start of Project construction. The evaluation of soil and groundwater shall include, but not be limited to, the following:
If contaminants below regulatory screening levels are identified, SVP shall coordinate with SCCDEH regarding soil reuse guidelines;
If contaminants exceeding applicable regulatory screening levels for construction workers and residen- tial users published by the RWQCB, DTSC, or the Environmental Protection Agency (EPA) (except for arsenic which is naturally occurring in the area), are encountered during the Soil and Groundwater Characterization Study SVP shall obtain regulatory oversight from SCCDEH and shall prepare a Soil and Groundwater Management Plan (SGMP); and
Soils found in concentrations above established thresholds (except for arsenic) shall be removed and disposed of according to California Hazardous Waste Regulations.
If a SGMP is needed, the SGMP shall be prepared to guide activities during excavation and other ground disturbing activities to ensure that identified contaminated soils or groundwater are handled, removed, and disposed of properly. The SGMP shall be prepared by a licensed qualified professional and submitted to SCCDEH at least 30 days prior to Project construction and shall include, but not be limited to, the following elements:
Procedures and protocols for the safe handling, storage, stockpiling, and disposal of contaminated soils; Contaminated soil excavated from the site shall be hauled off- site and disposed of at a licensed hazardous materials disposal site;
Evaluate potential
soil and
groundwater
contamination, if
present, prepare and
implement a Soil and
Groundwater
Management Plan
Prior to and
during
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-10 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
Protocols to manage and dispose of contaminated groundwater that may be encountered during trenching or subsurface excavation activities, and if dewatering is required; and Procedures and protocols to follow in the event soils or groundwater not previously identified as con- taminated and suspected of being contaminated (on the basis of visual, olfactory, or other evi dence) are identified during site grading or excavation activities or dewatering activities to allow for proper identification and characterization, and subsequent proper handling, removal, and disposal.
Hydrology and Water Quality
Water Quality MM HYD-1. SWPPP or Erosion Control Plan Development and Implementation. Following Project appro- val, SVP will prepare and implement a SWPPP, if required by State law, or erosion control plan to minimize construction impacts on surface water and groundwater quality. Implementation of the SWPPP or erosion control plan will help stabilize graded or disturbed areas and reduce erosion and sedimentation. The plan will designate BMPs that will be adhered to during construc tion activities. Erosion and sediment control measures, such as straw wattles, covers, and silt fences, may be installed before the onset of winter rains or any anticipated storm events if soils are not stabilized. Suitable stabilization measures will be used to protect exposed areas during co nstruction activities, as necessary. During construction activities measures will be in place to prevent contaminant discharge.
The Project SWPPP or erosion control plan will include erosion control and sediment trans -port BMPs to be used during construction. BMPs, where applicable, will be designed by using specific criteria from recognized BMP design guidance manuals. Erosion -minimizing efforts may include measures such as properly containing stockpiled soils.
Erosion control measures identified will be installed in an area before construction begins during the wet season and before the onset of winter rains or any anticipated storm events. Temporary measures such as silt fences or wattles, intended to minimize sediment transport from temporarily disturbed areas, will remain in place until disturbed areas have stabilized. The plan will be updated during construction as required by the SWRCB.
A worker education program shall be established for all field personnel prior to initiating fieldwork to provide training in the appropriate application and construction of erosion and sediment control mea - sures contained in the SWPPP. This education program will also discuss appropriate hazardous materials management and spill response. Compliance with these requirements will be ensured by the on -site construction contractor.
Ensure a SWPPP is
prepared and imple-
mented, or if a
SWPPP is not
required, ensure
that an erosion
control plan is
developed and
implemented to
minimize con-
struction impacts on
surface water and
groundwater quality
Prior to and
during
construction
Transportation
Construction
Traffic Control
MM T-1. Construction Traffic Control Plan. Prior to the start of construction, SVP or its designee shall prepare and submit an Encroachment Permit which will include the construction Traffic Con trol Plan for review and approval to the City’s Department of Public Works for public roads and transportation facilities that would be directly affected by the construction activities and/or would require permits and approvals.
SVP shall submit the construction Traffic Control Plan to the City prior to conducting activities covered in the traffic control permits. The construction Traffic Control Plan shall include, but not be limited to:
The locations and use of flaggers, warning signs, lights, barricades, delineators, cones, arrow boards, etc., according to standard guidelines outlined in the Manual on Uniform Traffic Control Devices, the Ensure that a
Construction Traffic
Control Plan is sub-
mitted by SVP and
approved by the City
of Santa Clara
Prior to
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 6. MITIGATION MONITORING PLAN
SEPTEMBER 2024 6-11 ADMINISTRATIVE DRAFT MND/IS
Impact Mitigation Measure
Monitoring
Requirement
Timing of
Action
Standard Specifications for Public Works Construction, and/or the California Joint Utility Traffic Control Manual.
Additional methods to reduce temporary traffic delays and trips during peak travel hours to the extent feasible.
Typical access routes between all staging areas and the proposed work areas. Defining methods to coordinate with the City throughout construction to minimize cumulative lane disruption impacts should simultaneous construction projects affect shared segments/ portions of the circulation system.
Prior to the start of construction, provide (or identify the timing to provide) the City with methods to comply with all specified requirements.
Plans to coordinate in advance with emergency service providers to avoid restricting the move ments of emergency vehicles. Police departments and fire departments shall be notified in advance by SVP of the proposed locations, nature, timing, and duration of any roadway disruptions, and shall be advised of any access restrictions that could impact their effectiveness. At locations where roads will be blocked, provisions shall be ready at all times to accommodate emergency vehicles, such as imme di- ately stopping work for emergency vehicle passage, providing short detours, and developing alternate routes in conjunction with the public agencies. Documentation of the coordination with police and fire departments shall be gathered prior to the start of construction. Plans to coordinate in advance with property owners, if any, that may have limited access to properties due to temporary lane closures. Provisions for ensuring secondary access should be provided. Plans to coordinate with Valley Transportation Authority in advance of construction to minimize disruption to mass transit.
Tribal Cultural Resources
Unanticipated
Tribal Cultural
Resources
MM TCR-1. Management of Unanticipated Tribal Cultural Resources. During project construction, should subsurface tribal cultural resources be discovered, all activity in the vicinity of the find shall stop and a qualified archaeologist and an authorized tribal representative shall be contacted to assess the signi fi- cance of the find according to CEQA Guidelines Section 15064.5 and Section 21074. If any find is determined to be significant, the archaeologist shall determine, in consultation with the implementing agency and any local Native American groups expressing interest, appropriate avoidance measures or other appropriate mitigation. Per CEQA Guidelines Section 15126.4(b)(3), preservation in place shall be the preferred means to avoid impacts to tribal cultural resources. Methods of avoidance may include, but shall not be limited to, Project reroute or redesign, or identification of protection measures such as capping or fenci ng.
Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if it is demonstrated that resources cannot be avoided, the qualified archaeologist shall develop additional treatment measures, such as data recovery or other appro priate measures, in consultation with the implementing agency and any local Native American representatives expressing interest in the tribal cultural resource.
Confirm that all
activity in the vicinity
of a found
subsurface tribal
cultural resource is
ceased and that an
authorized tribal
representative is
contacted
During
construction
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-1 ADMINISTRATIVE DRAFT MND/IS
7. RESPONSE TO COMMENTS
7.1. Introduction to Comments and Responses Section
The Final IS/MND includes the NRS -KRS 115 kV Transmission Line Project (Project) Draft IS/MND as revised, comments received on the Draft IS/MND, and responses to those comments.
This document has been prepared in accordance with California Environmental Quality Act (CEQA) as amended (Public Resources Code Section 21000 et seq.) and the Guidelines for Implementation of the California Environmental Quality Act (State CEQA Guidelines) (Cal. Code Regs., tit. 14, § 15000 et seq.) Although State CEQA Guidelines Section 15088 does not require a Lead Agency to prepare written responses to comments received on a Draft IS/MND, the City and SVP have elected to prepare the follow- ing written responses with the intent of providing a comprehensive and meaningful evaluation of the proposed Project.
This section summarizes and responds to the comments received during the public review period, which occurred from July 31 to August 30, 2024. This section also provides general responses to common comments.
7.2. Summary of Comments Received
Table 7-1 lists the Public Agencies, Groups, Organizations, and Individuals that submitted comments on the Draft IS/MND. The individual comments were numbered and are included in Appendix H, Public Comments on Draft IS/MND. This section summarizes the concerns in each comment and responds to them. It is important to note that only the substantive comments raised on the merits of the environ - mental analysis are identified, numbered, and responded to, while comments such as those related to the commenter’s interest in or opinions about the project, or a summary of the project itself were noted but not included.
If revisions were made to the IS/MND based on the comments, the revisions are summarized with the res
ponse to the specific comment and are indicated in the text of this Final IS/MND with strikeout for deletions of text, and in underline for new text.
Table 7-1. Comments Received on the Draft IS/MND
Commenter Date of Comment Comment #
A: Public Agencies, Groups, and Organizations
California Department of Fish and Wildlife (CDFW) 8/29/24 A1 SFPUC Water Enterprise 8/26/24 A2
San Jose International Airport 7/24/24 A3
California Department of Transportation (Caltrans) 8/29/24 A4 B: Individuals
Kanupriya Kabra 8/29/24 B1
Harsha Priya 8/29/24 B2
Aadya Shrotriya 8/29/24 B3
Jigisha Shukla 8/29/24 B4
Jigisha Shukla #2 8/29/24 B5
Praveen Vutukuru and Vijaya Chaganti 8/29/24 B6
Sudhir Kulkarni 8/29/24 B7
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-2 ADMINISTRATIVE DRAFT MND/IS
Commenter Date of Comment Comment #
Rajesh Upalekar 8/29/24 B8
Amit Chandak 8/30/24 B9
Neelam z.dabholkar 8/30/24 B10
Aman Sharma 8/30/24 B11
Aruna Pothukuchi 8/31/24 B12
Fang Gong 8/3/24 B13
Sriharish Pisipati 8/30/24 B14
Saurabh Sharma 8/30/24 B15
Saurabh Sharma #2 8/30/24 B16
Prithvi Arun 8/30/24 B17
Vishnu Hari 8/30/24 B18
Sathiya Narayanan 8/30/24 B19
Unnikrishnan Udinoor 8/30/24 B20
Sweety h 8/30/24 B21
Simple Yadav 8/30/24 B22
Niaz Khan 8/30/24 B23
Kuldeep Singh 8/30/24 B24
Paddy Subbian 8/30/24 B25
Anjana Batchu 8/30/24 B26
Anjana Batchu #2 8/30/24 B27
Amit Chandak #2 8/30/24 B28
Amit Chandak #3 8/30/24 B29
Candida Bayross 8/30/24 B30
Johny Rufus 8/30/24 B31
Mehul Suresh Jain 8/30/24 B32
Priyadarshini Vijayakumar 8/30/24 B33
Manojkumar Mohanram 8/30/24 B34
Anupama Lolage-Baheti 8/30/24 B35
Vijay Srinivasan 8/30/24 B36
Lini Kuriyan 8/30/24 B37
Olivier Madec 8/29/24 B38
Suneet Bisht 8/30/24 B39
Manjunath Jagannatharao 8/30/24 B40
Phani Shankar Pandravada 8/30/24 B41
Harini Tadinada 8/30/24 B42
Shankar Pandravada #2 8/30/24 B43
Vishaka Sutrave 8/30/24 B44
Jerin 8/30/24 B45
Punnya Ann Joy 8/30/24 B46
Manali Desai 8/30/24 B47
SriVidya Chavali 8/30/24 B48
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-3 ADMINISTRATIVE DRAFT MND/IS
Commenter Date of Comment Comment #
Hima Sree MC 8/30/24 B49
Lakshmikanth Chowdary Pothula 8/30/24 B50
Sith Thuon 8/29/24 B51
Cipson Jose 8/29/24 B52
Om Shankar 8/29/24 B53
Om Shankar #2 8/29/24 B54
Amit Thakkar 8/29/24 B55
Lenny Le 8/29/24 B56
Srinivas Dangeti 8/29/24 B57
Venkat Patchigolla 8/29/24 B58
Aparna Raman 8/29/24 B59
Gayathiri Lakshmanan 8/29/24 B60
Prashant Tiwari 8/29/24 B61
Srinivas Reddy 8/29/24 B62
Gane Sugali 8/29/24 B63
Adnan Hemani 8/29/24 B64
Darshna Siva 8/29/24 B65
Vinay Iyer 8/29/24 B66
Preetika Tiwari 8/28/24 B67
Kanupriya Kabra #2 8/28/24 B68
Ruchika Sarna 8/27/24 B69
Ruchika Sarna #2 8/28/24 B70
Yuri Kleban 8/27/24 B71
Sir Yuri 8/27/24 B72
Derek Fong 8/27/24 B73
Jeff Holmbeck 8/12/24 B74
7.3. General Responses to Common Comments
This section presents detailed responses to comments that were made by multiple commenters. General Responses (GR) address the following topics:
GR #1 – Human Health and Scope of CEQA
GR #2 – Electromagnetic Fields (EMF)
GR #3 – Corona and Induced Currents
GR #4 – Property Values and Cost
GR #5 – Aesthetics
GR #6 – Noise
GR #7 – Hazards
7.3.1. General Response #1 – Human Health and Scope of CEQA During the Public Comment Period, SVP hosted a Public Engagement Meeting on August 22. This meeting was attended by approximately one dozen community members, who expressed their concerns about the Project’s potential impact on human health. The commentors cited a list of State reviewing agencies and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-4 ADMINISTRATIVE DRAFT MND/IS
stated that none of the agencies listed have an association with human health. Commentors stated that CEQA reporting is not qualified enough regarding human health concerns, and recommended that other agencies, who are qualified to study “humans” should be involved in reviewing the proposal. Commentors stated that a third party or independent study should be completed in favor of human health.
CEQA analyses are guided by the CEQA Guidelines, which are defined as:
The CEQA Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) are administrative regulations governing implementation of the California Environmental Quality Act. The CEQA Guidelines reflect the requirements set forth in the Public Resources Code, as well as court decisions interpreting the statute and practical planning consider - ations. Among other things, the CEQA Guidelines explain how to determine whether an activity is subject to environmental review, what steps are involved in the environmental review process, and the required content of environmental documents. The CEQA Guide - lines apply to public agencies throughout the state, including local governments, special districts, and State agencies (OPR, 2024).
The IS/MND was prepared pursuant to the CEQA Guidelines, including all required content, and following the CEQA Appendix G checklist. Further, SVP conducted Public Scoping, which identified additional concerns to be addressed in the Draft IS/MND, expanding the scope of the CEQA document to include an EMF study which is not required as part of the CEQA Guidelines.
CEQA’s Appendix G checklist does not include specific questions related to human health, per se, but it does include questions that address the physical condition of the environment that would be affected by the Project and the nature of the environment with project implementation. Human health is impacted by the physical condition of the environment.
CEQA defines “environment” to mean “the physical conditions which exist within the area which will be affected by a proposed project, including land, air, water, minerals, flora, fauna, noise, objects of historic or aesthetic significance.” (Pub. Resources Code § 21060.5) For example, the Air Quality section discusses impacts related to toxic air contaminants, with which the thresholds of significance are set at a level that is agreed upon, by experts, to protect human health.
Not all impact analyses have quantitative thresholds due to their nature (Aesthetics, Energy, Public Services), and some concerns are not included in the CEQA checklist, because there is not a scientific consensus on a threshold of significance (See GR #2, EMF, as an example of this).
7.3.2. General Response #2 – EMF
Several commentors stated that consideration of EMF was absent prior to input during the scoping process.
The scoping process is designed to do exactly this; shape the environmental analysis. Commentors also stated that the lack of specifics included in the EMF section is not acceptable.
A project-specific EMF report was conducted by qualified engineers and was published along with the Draft IS/MND.
Commentors stated that because some of the information had been previously published in an SVP report, they would like a more detailed analysis. While it is true that language from a 2020 report was used, this information is still considered up -to-date, and is fully applicable to the NRS- KRS Project. The EMF report expands on the information presented, uses up -to-date modeling software, and provides detailed engineering drawings and graphs.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-5 ADMINISTRATIVE DRAFT MND/IS
Commentors included references to studies that further support SVP’s conclusion – that there is no scientific consensus on EMF impacts to human health. One reference provided by commentors states the following:
“In order to have confidence that an exposure agent is actually linked to human disease, scientists look for strong and consistent associations from epidemiological research. In the cases of electric and magnetic fields, the studies have found only weak association, or no association, between exposure and the incidence of some cancers. In addition, study out - comes are not consistent… There is a general consensus within the scientific community that exposure to EMF is not responsible for human disease” (PSCW, 2017).
It is not within the scope of this IS/MND to speculate on the impact of EMF on human health. The IS/MND has conducted a project-specific study on EMF and presented the results to be reviewed by the public and decision-making bodies.
Several comment letters included questions related to EMF. These are included below.
1. Have you conducted an existing EMF study to identify the current value of the community? (a) The EMF study included a simulation of current magnetic field strength values that exist in the area.
2. Are your EMF study values based on the cumulative, or interference of existing EMF and potential EMF.
(a) The EMF study was set up to assume constructive interference between the potential sources of magnetic fields. This study would not capture potential destructive interference between sources of EMF. Destructive interference between sources of EMF would hav e the effect of reducing EMF.
3. EMF value was calculated based on existing studies. What was the delta between mathematical modeling and actual values (from existing structures).
(a) No field study to take measurements of EMF was completed. The EMF study accounts for mathematical modeling as outlined in EPRI’s (Electric Power Research Institute) Transmission Line Reference Book, an industry standard reference book addressing electrical aspects of transmission line design.
4. What is the delta between underground and overhead structures’ EMF values? (a) The main change in reported magnetic field strength between overhead and underground placement of magnetic field sources would be due to proximity to the magnetic field source.
For example, an underground cable producing magnetic fields 10 feet below the ground surface would result in a higher magnetic field at the typical reporting and measuring height of 1 meter above ground compared to an overhead conductor installed 20 feet above ground.
5. Can you provide the same for Route options B and C? (a) The EMF study was completed for the preferred alignment only. The EMF study is dependent on the proposed design of the transmission line and nearby adjacent sources of magnetic fields such as other power lines. The proposed loading for the proposed transmission line would remain the same so the only changing variables that would affect the reported magnetic field strengths would be the height of the poles, conductor phasing, and adjacent power lines. An EMF study will not be prepared for routes that are not analyzed in detail in the CEQA document.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-6 ADMINISTRATIVE DRAFT MND/IS
6. What happens when electrification of rail lines happens- as this is already planned for the future? Have you potentially considered the cumulative EMF effect in coexistence of the high power lines and with railway lines’ electrification? Will the EMF values not be much higher then? (a) The future electrification of the rail lines was not considered. Without having specific informa- tion for the future electrification of the rail line, it is difficult to speculate whether or not EMF levels will increase, stay the same, or decrease.
7. Can you share the mathematical modeling maps of EMF for 115kV, 230kV and the next two higher values of the power line?
(a) The EMF report includes the modeling for the 115 kV transmission line. Magnetic fields are created by the current flow through the line. The current EMF report uses the forecasted current load (measured in amps) of the transmission line which is mostly ind ependent of the operating voltage. Although the Project is being designed for future growth, there are currently no plans to energize this line to 230 kV or beyond.
8. Can you share EMF maps from existing structures of 115kV, 230kV and the next 2 higher values of the power line?
(a) The existing power facilities identified running parallel to the proposed transmission line were included in the EMF report using existing load data from SVP. The existing power facilities along the alignment are 12 kV and 60 kV. Although the Project is being designed for future growth, there are currently no plans to energize this line to 230 kV or beyond.
9. Please share any EMF related information that you have especially if it contains assumptions for any calculations so we can understand the effects of current project and future projects. (a) All the data considered in the modeling of the magnetic field strength in the EMF report are detailed in the EMF report, which has been publicly available on the State Clearinghouse website since July 31, 2024.
10. Why does the electric pole structure proposed have wider diameter at the top? Can you share the design of the top of the pole? Can it be extended by adding another section by bolting, welding or any other method? If so, what extra voltage can be added to the line? (a) The structures themselves and their final geometries are still being finalized, but the proposed poles do not have a wider diameter at the top and are not expected to have a wider diameter at the top in the final design. While modifications to existing structures are possible and there is industry precedent for it, generally structures are replaced when significant upgrades become necessary. Although the Project is being designed for future growth, there are currently no plans to energize this line to 230 kV or beyond.
11. What is the proposed power consumption of 95054 zip code for the next 5, 10 and 15 years in the master plan?
(a) Based on SVP’s load growth plan, power consumption over the next 5, 10, and 15 years is estimated to be 450 MW, 538 MW, and 593 MW, respectively for the 95054 zip code. Please note that the 95054 zip code only includes a portion of the City.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-7 ADMINISTRATIVE DRAFT MND/IS
7.3.3. General Response #3 – Corona and Induced Currents Commentors expressed concerns about the Project’s proximity to the railway line, and the potential risks associated with corona and induced current effects.
As described in Section 5.21, t he corona effect for transmission lines describes the localized electrical discharge caused by ionization of the air surrounding the energized portions of the transmission line. The corona produced by a transmission line is dependent on multiple factors beyond operating voltage such as the diameter of the conductors, the location of conductors relative to each other, the elevation above sea level, weather, and more. Some possible byproducts of corona discharge on transmission lines include a faint glow, buzzing noise, and AM radio interference. Corona rings and specifically designed hardware designed for use on high voltage systems help mitigate corona by attenuating the electric field to reduce the electric field gradient that causes the ionization of the air adjacent to the energized surfaces. The corona effect is localized to the immediate vicinity of the energized portions of the transmission line.
To prevent any interference between the transmission line and the railroad, minimum safety clearances defined by the National Electrical Safety Code and CPUC’s GO-95 would be met or exceeded by the Project.
Additionally, the Applicant will work with UPRR a s needed during the permitting process, to ensure that there are no adverse impacts due to corona or induced currents.
7.3.4. General Response #4 – Property Values and Cost
Commentors expressed concerns about the reason the proposed Project route was chosen, specifically citing costs of construction. Commentors also expressed concerns that the Project may decrease property values.
The proposed Project route was chosen due to several reasons. It is inaccurate to say that the route was chosen based on costs alone. In the initial design process, several routes were considered. Prior to initia - tion of the IS/MND, an Alternatives Analysis was done, which analyzed three routes, and identified the Proposed Project as the most feasible. The reasons for this were explained in Section 4.16.
Property values are not within the scope of a CEQA review. CEQA focuses on the potential physical impacts of a project. The economic effects of a project need only be considered if those effects themselves would cause a significant physical impact on the environment. Decreases in property values are not physical impacts, are speculative, and are difficult to predict. The IS/MND does not speculate about potential effects on property value. Therefore, given the CEQA guidance regarding social and economic impa cts, this is not considered as part of CEQA environmental review.
7.3.5. General Response #5 – Aesthetics
Commentors expressed concerns about the aesthetic impact of the Project, citing that there were no photos from the east side of Lafayette Street presented in the IS/MND.
Revisions to Section 5.1 Aesthetics, were made to add additional information about the visual setting of the residents on the east side of Lafayette Street. The CEQA Appendix G questions focus on scenic resources and public views. The Project is located in a highly urbanized area. Public views of the Project would be from motorists and people on Lafayette Street, but private residences are not considered public viewpoints, and are therefore not specifically analyzed. However, public views from Lafayette Str eet, directly adjacent to these residents are analyzed.
Additionally, aesthetic impacts are analyzed based on the visual change from baseline conditions. The current visual setting includes transmission lines, telephone lines, street lighting, and traffic signals, as well as buildings, fences, landscaping, roads, and a railroad. For viewers looking at Lafayette Street from the sidewalk, the pol es within the median of Lafayette Street would be widely spaced and would not NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-8 ADMINISTRATIVE DRAFT MND/IS
represent a substantial change in the existing visual context. Motorists on Lafayette Street would view the new poles in the context of a developed visually complex built urban environment, and views would be fleeting as they drive. The poles that would be installed in the median of Lafayette Street would be visually consistent with the existing visually complex and built urban environment.
Attached here are three images from Google Earth that show the existing visual setting of locations along Lafayette Street, and explanations for the reasons why the Project would not be considered a significant visual change to the existing setting.
The existing urbanized setting, illustrated in Figure 7 -1, includes several industrial -type visual features, including power poles on both sides of Lafayette Street. Across Lafayette Street, several more power poles, a fenced railroad` right of way, NRS, and Levi’s Stadium are visible. The Project’s industrial elements would be consistent with the developed complex urban environment and would not result in a significant visual change.
Figure 7-1. View of Lafayette Street from the east side of the intersection of Lafayette Street and Fairway Glen Drive, looking west
Figure 7-2 illustrates the existing setting just north of the Mission Gardens community. This figure shows several industrial visual elements, such as power poles with several lines on them, light poles, a fenced railroad right of way, and traffic signals. The power poles shown in this image are older, shorter, and are spaced closer together than t he proposed Project. Residents who would view the Project from the east side of Lafayette Street would have views of the poles from their windows, however, the poles would be spaced further apart than existing power poles on Lafayette Street, approximately 300 feet apart.
Additionally, the poles would be much taller than existing infrastructure, increasing the conductor heights, and limiting the number of views from residences. The Project poles and lines would be viewed in the existing complex urban environment and are similar to the existing industrial elements present in the area. Therefore, there would be a low level of visual change.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-9 ADMINISTRATIVE DRAFT MND/IS
Figure 7-2. View of Lafayette Street from the east side of the intersection of Lafayette Street and Hope Drive, looking south
This image illustrates the public view experienced by motorists travelling north on Lafayette Street. The existing visual setting includes industrial elements such as power poles, light poles, a fenced railroad right of way, and Levi’s stadium in the backg round. Motorists on Lafayette Street would view the poles and lines in the median from this perspective, but their experience would be fleeting as they drive. The Project would introduce additional visual elements into the landscaped median but would not result in a significant visual change to the existing setting, given the existing complex visual environment of built and landscaped features. New poles would be widely spaced and existing landscaping between the street and buildings would often screen the views.
Figure 7-3. View of Lafayette Street from a motorist’s perspective, adjacent to the Mission Gardens community, looking north
77 NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-10 ADMINISTRATIVE DRAFT MND/IS
7.3.6. General Response #6 – Noise
Commentors expressed concerns related to noise produced by the Project during construction and after the new 115 kV transmission line becomes operational.
While construction of the project would create noise, this construction would occur within the times allowed under the City’s noise ordinance and would be temporary and intermittent. It is estimated that construction will take 14 months for the overhead alignment, however, due to the linear nature of the Project, construction will be moving along the route during this 14 -month construction period. After construction, ambient noise levels in the Project area are not anticipated to increase and would be similar to current noise levels.
There would be no noise produced by the Project after construction, aside from during maintenance activities or corona noise. The analysis anticipates no permanent increases in ambient noise levels in the project vicinity once the Project commences operation (Section 5.13.3) One source of audible noise would be due to the corona effect, which is caused by the electric field near the surface of the conductors (see Section 5.21.1.1, Corona).
Commentors specifically stated that they are concerned about noise levels, which are already high in the area due to the proximity of Lafayette Street, the railway line, and the air traffic route. Given that noise levels are elevated in the Project area, due to traffic noise and airport noise (Section 5.15.1), low levels of corona noise from Project components would not be noticeably audible and would not meaningfully contribute to an increase in noise levels relative to the existing conditions.
7.3.7. General Response #7 – Hazards
Commentors expressed concerns related to hazards, fire, and risk of accidents due to the proposed Project.
As stated in Section 5.7, Geology and Soils, the transmission line structures would be designed to meet or exceed all applicable local and State seismic design criteria.
As stated in Section 5.9, Hazards and Hazardous Materials, the Project would implement Mitigation Measure H-1 (Hazardous Substance Control and Emergency Response) and H -2 (Soil and Groundwater Management), to prevent and reduce potential impacts associate d with hazardous material use and the potential for encountering soil or groundwater contamination.
As discussed in Section 5.15, Public Services, the Project area is adequately served by the City of Santa Clara’s fire department. There are three fire stations located less than one mile from the proposed Project route, and the average response time is 3 minutes for all areas of the City.
As discussed in Sections 5.17, Transportation, and 5.20, Wildfire, the Project would not interfere with emergency response. These sections include a discussion of Mitigation Measure T-1 (Construction Traffic Control Plan), which ensures that access is main tained in the event of an emergency due to fire or other hazards. Fire risk associated with energized transmission lines is of concern in vegetated areas where the vegetation is a fuel source. In an urban setting, with lines located along streets, the risk of fire, such as from a downed line, is minimal.
Hazards due to induced current and the proximity to the railroad is discussed in General Response #3.
7.4. Responses to Comment Set A1 - California Department of Fish and Wildlife (CDFW)
Due to the specifics included in the CDFW comment letter, each concern was independently responded to. The alphanumeric codes correspond with the codes in the CDFW letter, presented in Appendix H, Public Comments on Draft IS/MND.
NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-11 ADMINISTRATIVE DRAFT MND/IS
A1-1 Thank you for your comment. The CDFW reviewer indicated that a CESA Incidental Take Permit would be required should the Project result in impacts to any CESA listed species.
As described in Section 5.4.1 (Setting) of the IS/MND the Project is located within a fully developed urban area between the San Jose International Airport and Levi Stadium in the City dominated by urban hardscape and land cover. As described in the analysis, CESA listed species are not expected to occur in or near the Project area and the Project is not expected to result in the take of any species listed under CESA. Therefore, a CESA Incidental Take Permit is not required for this project.
A1-2 The CDFW reviewer indicated that a notification pursuant to Section 1600 et seq. of the California Fish and Game Code would be required should the Project substantially divert or obstruct the natural flow; change or use material from the bed, channel, or bank (including associated riparian or wetland resources); or deposit or dispose of material where it may pass into a river, lake, or stream.
As described in response to Comment A1 -1, the project is located in an urbanized setting and there are no potentially jurisdictional waters or wetlands within the Project area. A supplemental site visit was conducted to verify site conditions and confirmed the analysis presented in Section
5.4 (Biological Resources). The Project will not affect any river, lake, or stream. No infrastructure will be installed beneath aquatic features. A Lake and Streambed Alteration Agreement is not required for the Project.
A1-3 Thank you for your comment. The CDFW reviewer notes that Fish and Games Codes provide protection to nesting birds and their eggs. Please see the response to Comment A1-9.
A1-4 The CDFW recommends the IS/MND analyze potential adverse impacts to fully protected species due to habitat modification, loss of foraging habitat, and/or interruption of migratory and breeding behaviors.
Due to a production error, Appendix E containing the table of known and potential occurrences of special-status species, including State fully protected species, that have the potential to occur in or near the Project area was inadvertently left out of the draft IS/MND. Appendix E is included in the Final IS/MND. The fully protected species identified in the assessment that do not also have a state and/or federal listing status include golden eagle and white-tailed kite. As described in Section 5.4.1 (Sett ing), the Project is located within a fully developed urban area dominated by urban hardscape and land cover. The Project area and surrounding land lack suitable habitat to support foraging or nesting for the golden eagle (Appendix E).
As described in Section 5.4.2(a)(Environmental Impacts and Mitigation Measures, Criterion ‘a’), limited suitable nesting trees are present within or near the proposed Project area that could support the white-tailed kite during nesting season. Marginal foraging habitat is present adjacent to the Northern Receiving Station, the landscaped interchange for Montague Expressway, and ruderal road shoulders along the west side of the Montague Expressway overpass. The limited marginal foraging habitat consists of ruderal land cover containing primarily grasses and other herbaceous vegetation. Current and historic Google Earth aerial and street view imagery identify these areas are periodically managed for weeds and fire abatement. To verify these conditions a supplemental site visit was conducted. No raptor nests were identified in suitable trees along the Project alignment and no white-tailed kites were observed. Due to the high level of human disturbance along the Project alignment and adjacent areas, the potential for white-tailed kite to nest or forage within or adjacent to the proposed Project area is low.
The Project would not result in habitat modification or the loss of foraging habitat, or the interruption of migratory behaviors. To ensure the Project does not impact breeding behavior or the viability of nests, should they occur, the IS/MND includes MM BIO-4 (Preconstruction Nesting NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-12 ADMINISTRATIVE DRAFT MND/IS
Bird Surveys and Nest Protection). This measure requires preconstruction nesting bird surveys and nest protection measures in the event an active bird or raptor nest is identified. MM BIO -2 (Biological Monitoring) requires a biological monitor who will con duct weekly monitoring checks of any sensitive resources that may be identified during the preconstruction surveys or inci- dentally found during construction. In addition, MM BIO-1 (Implement Worker Environmental Awareness Program) requires that all person nel working on the Project are trained on the applicable environmental regulations, BMPs, and other protective measures to ensure impacts to wildlife are reduced or avoided, as well as how to notify the biological monitor if an active nest or other wildlife are discovered in the Project work areas. The implementation of MM BIO-1 through MM BIO-3 will ensure impacts to fully protected species do not occur.
A1-5 The CDFW recommends that a full list or table is included in the updated Biological Resources Section of the IS/MND that notes species common name, scientific name, state and federal listing status (as applicable), habitat type preference and determination on presence, for all special - status species with the potential to occur within the Project area.
Due to a production error, Appendix E containing the table of known and potential occurrences of special-status species within the Project area was inadvertently left out of the draft IS/MND.
However, the conclusions presented in the Draft IS/MND were based on the evaluation of all potential species that have the potential to occur. Species that were considered to have a very limited or unlikely potential to occur were not carried forward for analysis. Appendix E contains a list of those species and the table is included in the Final IS/MND. The table includes a full list of special-status plant and wildlife species identified during the literature review that have a potential to occur within the Project area and 5 -mile query buffer. The common name, scienti fic name, listing status, habitat type preference, and determination on presence are included in the table for each species.
A1-6 The CDFW recommends the IS/MND provide baseline habitat assessments for special -status plant, fish and wildlife species located and potentially located within the Project area and sur - rounding lands, including all rare, threatened, and endangered species (CEQA Guidelines, §15380).
As stated in Section 5.4.1 (Setting), the IS/MND did include an assessment consistent with CEQA guidelines. The Project is located in an urbanized location and a review of the CDFW VegCAMP BIOS data was not initially conducted. A supplemental review of the Santa Cruz and Santa Clara Fine Scale Vegetation Map (TG & AIS 2023) shows the Project area and adjacent lands largely containing Urban (Developed) cover. Additionally, patches of Californian Annual & Perennial Grassland are mapped where the analysis identified ruderal land cover. Urban – Nonnative Forest cover were included urban landscape trees, particularly at the Oracle Santa Clara Campus/Agnews Historic Park. There are no sensitive vegetation communities in the Project area or adjacent areas.
The IS/MND adequately represented the vegetation communities within the Project area. As described in the Existing Habitat portion of Section 5.4.1 (Setting), “Urban/developed areas occur throughout the proposed Project area and adjacent lands, and include paved roads, bare ground associated with disturbance or development, buildings, paved parking lots, road medians and roadsides, railroad tracks and right-of-way, and landscaped areas. Land uses within the Study Area include residential, parks/open space, commercial, and industrial. Areas not containing hardscape are limited to residential, commercial, and roadside landscaped areas, landscaped parks/open space, and managed (e.g., mowing) ruderal areas of road shoulders and utility rights-of-way. Figure
5.4-1 identifies isolated ruderal communities, park/open space, and landscaped interchange areas meaningful to the analysis as they can provide marginal habitat for special-status species in some locations. The Study Area does not contain natural vegetati on community alliances as described in A Manual of California Vegetation (Sawyer et al., 2009).” NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-13 ADMINISTRATIVE DRAFT MND/IS
As described in the Jurisdictional Waters portion of Section 5.4.1 (Setting), “There are no poten - tially jurisdictional waters or wetlands within the proposed Project area based upon a review of the USFWS NWI Wetlands Mapper (USFWS, 2024b), USGS Milpitas and San Jose West 7.5-minute quadrangle map, and Google Earth aerial and street view imagery. A formal aquatic resources delineation was not completed for the proposed Project.” A supplemental site visit was conducted to re-verify site conditions and confirmed the assessment of vegetation/land cover and habitat described in Section 5.4 (Biological Resources).
A1-7 The CDFW recommends that the California Natural Diversity Database (CNDDB), as well as pre - vious studies performed in the area, be consulted to assess the potential presence of sensitive species and habitats. CDFW recommended a nine -quadrangle search to determine what may occur in the region.
The IS/MND adequately describes the potential of the proposed Project to impact sensitive plants and wildlife. A 5-mile buffer around the Project area was chosen for the CNDDB query conducted due to the heavily urbanized characteristic of the Project area and surrounding region. No Significant Natural Areas were identified within the Project area or 5-mile buffer.
Additional sources of information were utilized in this analysis, as listed in Section 5.4.1 (Setting), including the following:
• USFWS Information for Planning and Consultation federal resource list for the proposed Project area;
• CNPS Rare Plant Inventory species list within the 7.5 -minute quadrangles overlapping the Project area, Milpitas and San Jose West;
• Jepson eFlora with access to the Consortium of California Herbaria record locations for special-status plants;
• California Academy of Sciences and National Geographic Society – iNaturalist observations within a 5-mile buffer around the Project area;
• Cornell Lab of Ornithology eBird sensitive species observations within a 5-mile buffer around the Project area;
• NRCS Web Soil Survey and National Hydric Soils List; and • USFWS National Wetlands Inventory Wetlands Mapper.
A1-8 CDFW noted that according to Biogeographic Information and Observation System (BIOS) records, the Project site contains positive detections of several special-status species and has the potential to support numerous special-status species and their associated habitat.
The IS/MND adequately describes the potential for sensitive plants and wildlife to occur in or near the proposed Project area. We acknowledge the presence of special -status species occurrence records and the potential for the Project site to support several special -status species and their habitat in Section 5.4.1 (Setting – Special-Status Plants and Animals) and Section 5.4.2(a) (Environ- mental Impacts and Mitigation Measures – Criterion ‘a’). However, the Project is located in an urban environment with li mited habitat for sensitive species. Please also see the response to Comment A1-5.
A1-9 The CDFW notes that sensitive birds are known from the region and that trees would be removed during construction and recommends the project be constructed in compliance with APLIC guidelines.
Please see Comment A1-4 for the potential of sensitive birds to nest in any of the trees located in the Project area. In regard to APLIC guidelines, the IS/MND clearly defines the requirements to remain in compliance with APLIC guidelines. Section 4.11 (Pr oject Components) states that the NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-14 ADMINISTRATIVE DRAFT MND/IS
Project is being designed in compliance with current APLIC guidelines and will have sufficient dis- tance in between conductor wires as to prevent electrocution. The Project area does not contain wetlands or other aquatic features, large expanses of natural land cover, or agricultural fields that are attractive to birds and raptors (APLIC 1994). The ruderal land cover, landscaped interchange, and the Oracle Santa Clara Campus/Agnews Historic Park have the potential to attract birds; however, each of those areas has existing overhead electrical lines immediately adjacent to them.
The Project would not substantially change the baseline conditions at those locations.
The Project does not propose new electrical distribution lines, generator -tie lines, or fences.
Approximately half of the Project alignment involves existing utility poles supporting existing electrical transmission lines, electrical distribution lines, and/or communication lines, including along Lafayette Street between Agnew Road and Norman Avenue and between Laurelwood Road and the Kifer Receiving Station in the southern end of the Project. The Project would replace some of the existing utility poles along this portion of the alignment and be constructed with the existing lines as an underbuild to the proposed transmission lines; therefore, baseline conditions will not substantially change. The Project is being designed with enough distance between the conductor wires, to comply with current APLIC guidelines to prevent electrocution. SVP investigated the feasibility of placing the entire Project underground and concluded that it was infeasible due to the number of existing utilities underground that would necessitate relocations and require that the NRS-KRS line be buried very deep. An entirely underground option was determined to have more impacts due to the intensity required for construction and increase in ground disturbance when compared to an overhead line. Lastly, schedule and cost were considered, and an entirely underground option would cost more, take longer to construct, and would limit the capacity of the line, which would not meet the objectives of the Project.
A1-10 The CDFW recommends that MM BIO-4 be amended to include different nesting seasons for small bird species, owls, and other raptors, in addition to different survey radii for passerines, small raptors, and large raptors.
To respond to the request, MM BIO-4 (Preconstruction Nesting Bird Surveys and Nest Protection) has been modified to include the different nesting seasons for small bird species, owls, and other raptors as recommended. This measure has also been modified to incorporate the recommended survey radii of 250 feet for passerines and 500 feet for raptors.
MM BIO-4 requires that a preconstruction nesting bird survey shall be conducted no more than 7 days before any work activities occur at a given Project location. Further, if there is a break in construction at a work location for a period of 14 or more day s during the nesting season, a new survey shall be completed before work resumes at that location. Additionally, MM BIO-2 requires weekly biological monitoring of any Project work locations in proximity to sensitive biological resources identified during preconstruction surveys, and any resources identified by the crew incidentally.
Given the highly urbanized nature of the Project area and surrounding region and limited line-of- sight due to residential and urban structures, the recommendation for conducting three surveys prior and including a 1,000 -ft radii survey area for larger rapt ors would be excessive and would not contribute to the protection of these birds.
A1-11 The CDFW recommends the IS/MND should propose measures to conduct a bat habitat assess - ment of suitable bat roosting habitat, provide a survey methodology plan, and tree removal plan.
The IS/MND adequately characterized the potential for bats to roost and forage in the Project area and included measures to avoid or minimize impacts to local bats. Due to the heavily urbanized setting and the level of disturbance in proximity to the limited roosting and foraging NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-15 ADMINISTRATIVE DRAFT MND/IS
habitat, there is a very low potential for bats to be present in available roost habitat along the Project alignment. To verify the conclusions presented in the IS/MND, a supplemental site visit was performed to inspect the three trees proposed for removal. This survey confirmed the absence of structural features that provide day roost habitat for crevice and cavity/hollow roost - ing bats. In addition, MM BIO-5 (Preconstruction Bat Survey and Implement Avoidance Measures) requires a preconstruction survey for bats to determine if roost habitat is present and if bats are roosting in trees or other vegetation requiring removal for the Project. In the unlikely event that the trees proposed for removal develop features that provide suitable roost habitat, MM BIO -5 will ensure that impacts to roosting bats will not occur by requiring the development of a Bat Mitigation and Monitoring Plan which requires coordination with the City and CDFW. The Plan shall include information pertaining to the species of bat and loca tion of the roost, the recom - mended two-step tree removal process, compensatory mitigation for permanent impacts (including specific mitigation ratios and location of proposed mitigation), and monitoring to assess bat use of mitigation areas.
A1-12 The CDFW notes that Crotch’s bumble bee, a state candidate for listing, has been detected in the region and recommends a habitat assessment be conducted by a qualified entomologist knowledgeable with the life history and ecological requirements of Crotch’s bumble bee.
The IS/MND adequately characterized the potential for Crotch’s bumble bee to occur in the Project area. Due to the heavily urbanized setting and the existing level of disturbance, there is a very low/minimal potential for Crotch’s bumble bee to be present along the Project alignment and adjacent land. To verify conditions, a supplemental site visit was conducted of the Project area which confirmed the presence of suitable nest habitat, California ground squirrel and other small mammal burrows, in the ruderal roadside land cover along Bassett Street and the land - scaped interchange area south of the Montague Expressway overpass. However, the interchange area south of the overpass is outside of the Project work area and 50 -ft avoidance buffer recommended for avoiding impacts to bumble bee nests, if present. Further, the ruderal roadside areas are extremely narrow and land use within and adjacent to the Project alignment contains few flowering plants that would provide high quality forage for Crotch’s bumble bee. However, in the unlikely event this species occurs in the Project area during construction, the IS/MND included MM BIO-3 (Conduct Preconstruction Surveys for Special-Status Wildlife and Implement Avoidance Measures) which was modeled on the CDFW survey considerations for CESA candidate bumble bee species and requires a preconstruction survey for Crotch’s bumble bee and the establishment of a 50-foot avoidance buffer around a nest, if present. MM BIO -3 states that the survey shall focus on the ruderal habit at within the utility right -of-way adjacent to the Northern Receiving Station and landscaped and ruderal land at the Montague Expressway interchange, but does not state that the survey shall be limited to these locations. Because of the low likelihood of t his species occurring in the Project Area, SVP will not be seeking incidental take authorization for Crotch’s bumble bee.
SVP has confirmed that the use of herbicides and mowing activities will not occur during con - struction and are not activities they apply for operations or maintenance of facilities in the Project area.
A1-13 The CDFW indicated that burrowing owl is known from the region and recommends the IS/MND should include a thorough habitat assessment of potential burrowing owl habitat within and adjacent to the Project area.
As discussed in Section 5.4.2(a)(Environmental Impacts and Mitigation Measures, Criterion ‘a’), there are numerous CNDDB records for burrowing owl in the region of the Project area including a 2014 occurrence record overlapping the Northern Receiving Station, adjacent ruderal utility NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-16 ADMINISTRATIVE DRAFT MND/IS
right-of-way, and Levi’s Stadium. To verify site conditions, a supplemental site visit was conducted of the Project area which included the most likely areas that could support burrowing owls. This included the northeastern end of the ruderal utility right -of-way adjacent to the Project. Habitat in this area appeared graded and contained a layer of erosion control material possibly from hydroseeding. No burrows or owls were observed from the fence line using binoculars. In other areas of the right-of-way, the vegetation was approximately 1 to 3 feet tall. In addition, the ruderal utility right-of-way does not provide suitable habitat for burrowing owl. Suitable burrowing owl habitat was not observed in the ruderal roadside areas or the landscaped interchange north of Montague Expressway. The narrow roadside area between Bassett Street and Lafayette Street was observed to lack suitable burrow habitat and contained a high degree of human presence.
The narrow roadside areas adjacent to Montague Expressway on the west side of the overpass contained dense herbaceous vegetation approximately 3 to 5 feet tall. The landscaped inter - change north of Montague Expressway was heavily disturbed by staging activities for an unrelated and unknown construction project. The landscaped interchange south of Montague Expressway contains suitable burrowing owl habitat (i.e., California ground squi rrels and burrows, short vegetation); however, no owls or their sign were observed.
To ensure that owls are protected in the event that habitat and land cover/use changes over time, the IS/MND included MM BIO-3 (Conduct Preconstruction Surveys for Special-Status Wildlife and Implement Avoidance Measures) which includes prescriptive survey recommendations and miti - gation guidelines for burrowing owls. If active burrows or potentially active burrows are identified, a 250-ft avoidance buffer will be established during the nesting season, and a 160 -ft avoidance buffer outside the nesting season. Given the highly urbanized characterization of the Project area and surrounding region in addition to the small Project footprint, these avoidance buffer sizes would be adequate. Please note that MM BIO-3 also states “The prescribed buffers may be adjusted by the qualified avian biologist in coordination with the City and CDFW based on existing conditions around the burrow, planned construction activities, tolerance of the species at a given location, and other pertinent factors.” This would include increasing buffers should an owl show signs of disturbance.
7.5. Responses to Comment Set A2 - SFPUC Water Enterprise Representatives from the San Francisco Public Utilities Commission (SFPUC) submitted a comment identi- fying SFPUC parcels that may be within the proposed Project site. They requested that SVP work with SFPUCs Real Estate Services regarding land rights. SFPUC requested to be listed as a responsible agency in the CEQA document.
The proposed NRS-KRS 115 kV Transmission Line crosses the SFPUC ROW on Lafayette Street contained within the public road ROW. There are no proposed project activities that would encroach on SFPUC ROW.
SVP will coordinate with SFPUC as needed to ensure that the Project follows the required SFPUC processes, and that the Project would not interfere with, endanger, or damage existing or future SFPUC operations, security, or facilities.
7.6. Responses to Comment Set A3 - San Jose International Airport Representatives from the San Jose International Airport (SJC) submitted a comment which expressed concerns about some transmission structures in the southern portion of the Project, due to their height and location near the airport.
SVP and SJC held a meeting to discuss concerns that SJC had regarding the Project based on the filed 7460 form on the FAA’s Obstruction Evaluation website. In the meeting, SJC shared their airport -specific requirements for One-Engine Inoperative elevation restrictions in the vicinity of the departure and NRS-KRS 115 KV TRANSMISSION LINE PROJECT 7. RESPONSE TO COMMENTS
SEPTEMBER 2024 7-17 ADMINISTRATIVE DRAFT MND/IS
approach angles to the airport’s runways. The structure location and height limits were discussed in relation to the specific needs of the airport in order to maintain a safe airspace around the airport. As a result of the meeting, structures on the propos ed transmission line on Bassett Street south of the Laurie Avenue and Lafayette Street intersection are being designed so that each structure remains below the elevation limit defined by SJC’s One -Engine Inoperative Surfaces map that was provided to SVP. No changes to the IS/MND are required due to this change.
7.7. Responses to Comment Set A4 - California Department of Transportation (Caltrans)
Representatives from the California Department of Transportation (Caltrans) submitted a comment letter which identified several regulations, restrictions, or permits, that may be required by the Project.
The letter identifies the Project as being within the Airport Land Use Compatibility Plan for Santa Clara County and recommends that the City consider the safety zone and noise compatibility policies stipulated in the ALUCP. Section 5.9, Hazards and Hazardous Materials, of the IS/MND explains that the Project will comply with FAA Part 77 regulations, ensuring impacts related to aviation hazards are less than significant.
The applicant will coordinate with Caltrans as needed prior to or during the construction process to ensure that any permits, such as Encroachment permits, are acquired.
7.8. Responses to Comment Set B1 through B74
Concerns raised in comments B1 through B74 are addressed in General Responses numbers 1 through 7, above.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 ADMINISTRATIVE DRAFT MND/IS
Appendix A
LIST OF PREPARERS
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 A-1 ADMINISTRATIVE DRAFT MND/IS
LIST OF PREPARERS
A consultant team headed by Aspen Environmental Group prepared this document under the direction of Silicon Valley Power. The preparers and technical reviewers of this document are presented below.
Lead Agency
Silicon Valley Power, City of Santa Clara
Allie Jackman, Principal Electric Utility Engineer ......................... Project Manager & Lead Agency Contact Project Management and Document Production
Aspen Environmental Group – Prime Contractor
Hedy Koczwara, Vice President, Sr. Environmental Scientist ...... Program Manager Grace Weeks, Environmental Scientists ...................................... Project Manager, Agriculture and Forestry, Hydrology and Water Quality, Public
Services, Utilities, and Service Systems,
Population and Housing, Recreation
Fritts Golden, Senior Associate .................................................... Project Oversight, Aesthetics, Land Use and Planning, Corona and Induced
Effects, Cumulative
Rachael Dal Porto, Environmental Engineer ................................ Air Quality, Greenhouse Gas, Energy Lauren DeOliveira, Cultural Resources Group Manager .............. Cultural Resources, Tribal Cultural Resources
Krystal Pulsipher, Senior Biologist ............................................... Biological Resources Aurie Patterson, Environmental Scientist & Geologist ................ Geology and Soils, Hazards and Hazardous Materials, Mineral Resources
Jeffrey Linn ................................................................................... Noise, Transportation, Wildfire Sharon Heesh ............................................................................... Document Production Kati Simpson................................................................................. Graphic Design Chris Notto ................................................................................... GIS/Graphics Kramer Botanical – Subcontractor for Arborist Report
Neal Kramer, Botanist/Ecologist, Certified Arborist .................... Arborist Report
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 ADMINISTRATIVE DRAFT MND/IS
Appendix B
REFERENCES
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-1 ADMINISTRATIVE DRAFT MND/IS
REFERENCES
4. Project Description
City of Santa Clara. 2023. MapSantaClara Parcel Identification. https://www.san taclaraca.gov/our-city/ departments-a-f/community-development/planning-division/map-santa-clara. Accessed February 2024.
DHS (California Department of Health Services). 2002. An Evaluation of the Possible Risks from Electric an
d Magnetic Fields (EMFs) from Power Lines, Internal Wiring, Electrical Occupations, and Appliances. California EMF Program. June 2002. [Online]: https://ia.cp uc.ca.gov/Environment/ info/esa/lakeview/resources/01_introduction.pdf. Accessed May 2024.
WHO (World Health Organization). 2001. International EMF Project. May 2001. [Online]: https://www. who.int/publications/m/item/international-advisory-committee-meeting-minutes-2001.
Accessed May 2024.
_____. 2007. Environmental Health Criteria Monograph No. 238. Extremely Low Frequency Fields. March 13, 2007
. [Online]: https://www.who.int/publications/i/item/9789241572385. Accessed May 2007.
5.1 Aesthetics
None
5.2 Agriculture and Forestry Resources
City of Santa Clara. 2014. City of Santa Clara Zoning Map. Updated January 2014. http://santaclaraca.go v/ home/showdocument?id=756. Accessed April 1, 2024.
DOC (California Department of Conservation). 2022. California Important Farmland Finder. https://maps. conservation.ca.gov/DLRP/CIFF/. Accessed April 1, 2024.
DOC 2017. State of California Williamson Act Contract Land Map. https://planning.l acity.org/eir/Holly woodCenter/Deir/ELDP/(E)%20Initial%20Study/Initial%20Study/Attachment%20B%20Refer ences/California%20Department%20of%20Conservation%20Williamson%20Map%202016.pdf.
Accessed April 1, 2024.
_____. 2016. Important Farmland in California, 2014. ftp://ftp.consrv.ca.go v/pub/dlrp/FMMP/pdf/ statewide/2014/fmmp2014_08_11.pdf. Accessed April 1, 2024.
5.3 Air Quality
BAAQMD. 2022. CEQA Air Quality Guidelines. https://www.ba aqmd.gov/plans-and-climate/california- environmental-quality-act-ceqa/updated-ceqa-guidelines. Accessed May 5, 2024. _____. 2023. Air Quality Standards and Attainment Status. https://www.ba aqmd.gov/about-air-quality/ research-and-data/air-quality-standards-and-attainment-status. Accessed May 5, 2024.
CARB (California Air Resources Board). 2016. Ambient Air Quality Standards Chart. https://ww2.arb.ca. gov/sites/default/files/2020-07/aaqs2.pdf. Accessed May 5, 2024.
City of Santa Clara. 2014. City of Santa Clara 2010 2035 General Plan. City Council adopted on November 16, 2010. Updated December 9, 2014. https://www.sant aclaraca.gov/our-city/departments-a-f/ community-development/planning-division/general-plan. Accessed May 5, 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-2 ADMINISTRATIVE DRAFT MND/IS
5.4 Biological Resources
ABB (All About Birds), 2024. All About Birds: The Cornell Lab of Ornithology. [Online]: https://allabout birds.org. Accessed April 2024.
APLIC (Avian Power Line Interaction Committee). Mitigating Bird Collisions With Power Lines: The State of the Art in 1994. Edison Electric Institute and APLIC. Washington, D.C. ______. 2006. Suggested Practices for Avian Protection on Power Lines: The State of the Art in 2006.
Edison Electric Institute, APLIC, and the California Energy Commission. Washington, D.C. and Sacramento, CA. http://www.aplic.org/uploads/files/2643/SuggestedPractices2006(LR 2).pdf. ______. 2012. Reducing Avian Collisions with Power Lines: The State of the Art in 2012. Edison Electric Institute and APLIC. Washington, D.C. http://www.a plic.org/uploads/files/11218/Reducing_ Avian_Collisions_2012watermarkLR.pdf.
Baldwin et al., 2012 (Baldwin, B.G., D.H., Goldman, D.J. Keil, R. Patterson, and T.J. Rosatti). The Jepson Manual: Higher Plants of California. 2nd edition. University of California Press, Berkeley, California.
Bumble Bee Watch 2024 – Bumble Bee Watch, a collaborative effort to track and conserve North America’s bumble bees. Partners: Wildlife Preservation Canada, The Xerces Society for Invertebrate Conservation, York University Faculty of Environmental Studies, University of Ottawa, Montreal Insectarium, London Natural History Museum, BeeSpotter. [Online]: https:// www.bumblebeewatch.org/about/. Accessed April 2024.
CalTrans and CDFW (California Department of Fish and Wildlife). 2010. California Essential Habitat Connectivity Project: A Strategy for Conserving a Connected California. Available online at:
https://wildlife.ca.gov/Science-Institute/Habitat-Connectivity. Accessed April 2024.
CDFW (California Department of Fish and Wildlife). 2013. Report to the Fish and Game Commission:
Evaluation of the Petition from the Center for Biological Diversity to List Townsend’s Big -eared Bat ( Corynorhinus townsendii) as Threatened or Endangered Under the California Endangered Species Act. Prepared by California Department of Fish and Wildlife, March 2013. ______. 2016. Status Review: Swainson’s Hawk (Buteo swainsoni) in California. California Department of Fish and Wildlife, Wildlife and Fisheries Division Nongame Wildlife Program, Sacramento, CA. April 11, 2016.
______. 2019. California Department of Fish and Wildlife (CDFW). Report to the Fish and Game Commission: Evaluation of the Petition from the Xerces Society, Defenders of Wildlife, and the Center for Food Safety to List Four Species of Bumble Bees as Endang ered Under the California Endangered Species Act. Prepared by California Department of Fish and Wildlife, April 4, 2019. _____. 2023. Survey Considerations for California Endangered Species Act (CESA) Candidate Bumble Bee Species. California Department of Fish and Wildlife, Sacramento, CA. Available online at: https:// wildlife.ca.gov/Conservation/Survey-Protocols#377281281-invertebrates. Accessed April 2024. ______. 2024. California Natural Diversity Database (CNDDB), Rarefind, Version 6. Heritage Section, CDFW, Sacramento.
CNPS (California Native Plant Society). 2024. Rare Plant Inventory. California Native Plant Society, Sacramento. [Online]: https://rareplants.cnps.org/Home/. Accessed April 2024.
CWHR. 2021. California Wildlife Habitat Relationships (CWHR) System. Various species accounts. Updated versions of California’s Wildlife, edited by Zeiner, D.C. et all 1998 -1990. CDFW, Sacramento, CA. [Online]: https://wildlife.ca.gov/Data/CWHR/Life-History-and-Range. Accessed: April 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-3 ADMINISTRATIVE DRAFT MND/IS
eBird.org. 2024. eBird: An online database of bird distribution and abundance [web application]. eBird, Ithaca, New York. [Online]: https://ebird.org/home. Accessed April 2024.
Hatfield, R., S. Jepson, R. Thorp, L. Richardson, S. Colla, 2008. Bombus caliginosus. The IUCN Red List of Threatened Species 2014: e.T44937726A69000748. [Online]: http://dx.d oi .org/10.2305/IUCN.UK. 2014-3.RLTS.T44937726A69000748.en. Accessed April 2024.
ICF International 2012. Final Santa Clara Valley Habitat Plan. Prepared for City of Gilroy, City of Morgan Hill, City of San Jose, County of Santa Clara, Santa Clara Valley Transportation Authority, and Santa Clara Valley Water District. August 2012. [Onli ne]: https://www.s cv-habitatagency.org/178/ Santa-Clara-Valley-Habitat-Plan. Accessed April 2024.
iNaturalist. 2024. iNaturalist Online Database. [Online]: https://www.inaturalist.org/home. Accessed April 2024.
Jepson eFlora. 2024. Jepson eFlora. The Jepson Herbarium, University of California, Berkeley. Revision 12 (2
023) [Online]: https://ucjeps.berkeley.edu/eflora/. Accessed April 2024.
Jepson, S., D.F. Schweitzer, B. Young, N. Sears, M. Ormes, S.H. Black, 2015. Conservation Status and Ecology of Monarchs in the United States. 36 pp. NatureServe, Arlington, Virginia, and the Xerces Society for Invertebrate Conservation, Portland, Oregon.
NAS 2023 – National Audubon Society (NAS). 2023. Important Bird Areas. [Online]: https://ca.audubon. org/important-bird-areas-9. Accessed April 2024.
NatureServe. 2024. NatureServe Explorer [web application]. NatureServe, Arlington, Virginia. [online]:
https://explorer.natureserve.org/. Accessed April 2024.
Sawyer et al. (Sawyer, J., T. Keeler-Wolf, and J. Evans). 2009. A Manual of California Vegetation: Second Edition, 2009.
Shuford, W. D., and T. Gardali (editors). 2008. California Bird Species of Special Concern: A ranked assessment of species, subspecies, and distinct populations of birds of immediate conservation concern in California. Studies of Western Birds 1. Western Field Ornithologists, Camarillo, California, and California Department of Fish and Game, Sacramento.
USDA NRCS (U.S. Department of Agriculture, Natural Resources Conservation Service). 2024a. Web Soil Survey 3.4.0. [Online]: https://websoilsurvey.nrcs.usda.gov/app/. Accessed April 2024. ______. 2024b. National Hydric Soil List by State. [Online]: https://www.nr cs.usda.gov/publications/ query-by-state.html. Accessed April 2024.
USFWS (U.S. Fish and Wildlife Service). 2020. Monarch ( Danaus plexippus ) Species Status Assessment Report, version 2.1. Prepared by U.S. Fish and Wildlife Service. 96 pp + appendices. ______. 2023. Species status assessment report for the northwestern pond turtle (Actinemys marmorata) and southwestern pond turtle ( Actinemys pallida), Version 1.1, April 2023. U.S. Fish and Wildlife Service, Ventura Fish and Wildlife Office, Ventura, California. ______. 2024a. IPaC: Information for Planning and Consultation. [Online]: https://ipac.ec osphere.fws. gov/. Accessed April 2024.
______. 2024b. National Wetlands Inventory Wetlands Mapper. [Online]: https://fwsprimary.wim.us gs. gov/wetlands/apps/wetlands-mapper/
WBWG 2017 – Western Bat Working Group (WBWG). Western Bat Species. [Online]: http://wbwg.o rg/ western-bat-species/. Accessed April 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-4 ADMINISTRATIVE DRAFT MND/IS
Xerces Society. 2018. Petition to the State of California, Fish and Game Commission, to list the Crotch bumble bee (Bombus crotchii), Franklin’s bumble bee (Bombus franklini), Suckley cuckoo bumble bee ( Bombus suckleyi ), and western bumble bee ( Bombus occidentalis occidentalis ) as endangered under the California Endangered Species Act. Prepared by The Xerces Society for Invertebrate Conservation, Defenders of Wildlife, and Center for Food Safety. October 2018.
5.5 Cultural Resources
Broek, J.O.M. 1932. The Santa Clara Valley, California: A Study in Landscape Changes. N.v.A. Oosthoek’s Utig. Maadtij, Utrecht.
Cutter, D.C. 1978. Plans for the Occupation of Upper California: A New Look at the “Dark Age” from 1602 to 1769. Journal of San Diego History 24(1):78-90.
Findlay, J.M. and D.M. Garaventa. 1983. Archaeological Resources of Downtown San Jose: A Preliminary Planning Summary of Prehistoric and Historic Sites in the Central Business District. MS on file, S 5905, CHRIS/NWIC, CSU Sonoma, Rohnert Park.
Fitzgerald, R.T. and J. Porcasi. 2003. The Metcalf Site (CA-SCL-178) and Its Place in Early Holocene California Prehistory. Society for California Archaeology Newsletter 37(4):27-31.
Fitzgerald, R.T. 1991. Archaic Milling Cultures of the Southern San Francisco Bay Region. Archives of California Prehistory 35. Coyote Press, Salinas.
Fredrickson, David A. 1973. Spatial and Cultural Units in Central California Archaeology. University of California, Berkley.
Hart, J.D. 1987. A Companion to California (revised and expanded). Oxford University Press, New York.
Heizer, R.F., and S.F. Cook. 1953. “Capay Man,” An Ancient Central California Indian Burial. In Papers on California Archaeology: 21-26, edited by Richard F. Heizer. Reports of the University of California Archaeological Survey 22:24-26, University of California, Berkeley, Department of Anthropology.
Heizer, R.F. 1949. The Archaeology of Central California, L· The Early Horizon. University of California Anthropological Records. University of California Press, Berkeley. 12(1):1-84. _____. 1952. A Review of Problems in the Antiquity of Man in California. In Symposium of the Antiquity of Man in California, pp. 1 -10. Reports of the University of California Archaeological Survey No. 16:3 17.
_____. 1950. Observations on Early Man in California. In Papers on California Archaeology: 1 -5, pp. 5-10.
Reports of the University of California Archaeological Survey No.7, Berkeley.
Hendry, G.W. and J.N. Bowman. 1940. The Spanish and Mexican Adobe and Other Buildings in the Nine San Francisco Bay Counties, 1776 to about 1850 (and associated maps). MS on file, Bancroft Library, University of California, Berkeley.
Hildebrandt, W.R. 1983. Archaeological Research of the Southern Santa Clara Valley Project: Based on a Data Recovery Program from Sites CA-SCl-54, CA-SCl-163, CA-SCl-178, CA-SCl-237, and CA-SCl-241 Located in the Route 101 Corridor, Santa Clara County, Cal ifornia. Submitted to California Department of Transportation, District 4, San Francisco. Report S 6369. On file at the Northwest Information Center, Sonoma State University, Rohnert Park, CA.
Levy, R. 1978. Costanoan. In California, edited by R.F. Heizer, Volume 8. Handbook of North American Indians, W.G. Sturtevant, general editor, pp. 485-497. Smithsonian Institution, Washington, D.C.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-5 ADMINISTRATIVE DRAFT MND/IS
Lillard, J.B., R.F. Heizer, and F. Fenenga. 1939. An Introduction to the Archaeology of Central California.
Sacramento Junior College Department of Anthropology Bulletin 2. Board of Education of the Sacramento City Unified School District, Sacramento, California.
Meighan, C.W. 1965. Pacific Coast Archaeology. The Quaternary of the United States, edited by H.E.
Wright and D.G. Frey.
Winther, J.C. 1935. Archaeological Investigations at CA -SCl-128, The Holiday Inn Site. For the Ohlone People and the Redevelopment Agency of the City of San Jose, California. MS on file, S-5281, CHRIS/NWIC, CSU Sonoma, Rohnert Park.
5.6 Energy
CEC (California Energy Commission). 2022. Final 2021 Integrated Energy Policy Report (IEPR), Volume II - Ensuring Reliability in a Changing Climate. https://efiling.e nergy.ca.gov/GetDocument.aspx?tn= 241583. Accessed April 26, 2024.
_____. 2023a. 2021 Power Content Label for City of Santa Clara/Silicon Valley Power. https://www. energy.ca.gov/filebrowser/download/4673. Accessed April 26, 2024. _____. 2023b. Refinery Inputs and Production, Weekly Fuels Watch Dashboard. Data last updated:
September 27, 2023. https://www.ener gy.ca.gov/data-reports/reports/weekly-fuels-watch/ refinery-inputs-and-production. Retrieved April 15, 2024. _____. 2024. Electricity Consumption by Entity. http://www.ecdms.energy.ca.gov/elecbyutil.aspx.
Accessed May 3, 2024.
CPUC (California Public Utilities Commission). 2008. Energy Action Plan, 2008 Update. February. http:// www.cpuc.ca.gov/eaps/. Accessed April 26, 2024.
City of Santa Clara. 2024. Utility Fact Sheet. Electric Utility: City of Santa Clara. January –December 2023. http://www.siliconvalleypower.com/svp-and-community/about-svp/utility-fact-sheet. Accessed April 26, 2024.
SVP (Silicon Valley Power). 2023. Final 2023 Integrated Resource Plan for Silicon Valley Power. Adopted by
the Santa Clara City Council, December 5, 2023. https://www.si liconvalleypower.com/home/ showpublisheddocument/82481/638367924630670000. Accessed May 3, 2024.
5.7 Geology and Soils
CGS (California Geological Survey). 2001. Seismic Hazard Zone Report for the Milpitas 7.5 -Minute Quadrangle, Alameda and Santa Clara Counties, California. https://maps.co nservation.ca.gov/ cgs/EQZApp/app/.
_____. 2016. Earthquake Shaking Potential for California. https://www.co nservation.ca.gov/cgs/docu ments/publications/map-sheets/MS_048.pdf. Site specific data viewed at: https://usgs.maps. arcgis.com/apps/webappviewer/index.html?id=5a6038b3a1684561a9b0aadf88412fcf. Accessed April 2024.
_____. 2018. Earthquake Fault Zones, CGS Special Publication #42. https://www.co nservation.ca.gov/cgs/ Documents/Publications/Special-Publications/SP_042.pdf. Accessed April 2024. _____. 2024a. Earthquake Zones of Required Investigation. https://maps.co nservation.ca.gov/cgs/EQZ App/app/. Accessed April 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-6 ADMINISTRATIVE DRAFT MND/IS
_____. 2024b. Big California Earthquakes. https://www.conservation.ca.gov/cgs/earthquakes/significant.
Accessed April 2024.
City of Santa Clara. 2011. City of Santa Clara Draft 2010-2035 General Plan: Integrated Final Environmental Im
pact Report. January 2011. http://santaclaraca.gov/home/showdocument?id=12900.
Accessed April 2024.
_____. 2014. City of Santa Clara 2010-2035 General Plan. City Council adopted on November 16, 2010.
Upd
ated December 9, 2014. https://www.sant aclaraca.gov/our-city/departments-a-f/commu nity-development/planning-division/general-plan. Accessed April 2024.
County of Santa Clara. 2012. “Santa Clara County Geologic Hazard Zones.” https://stgenpln.bl ob.core. windows.net/document/GEO_GeohazardATLAS.pdf. Accessed April 2024.
DWR (Department of Water Resources). 2024. Water Data Library Groundwater Levels. https://wdl.w ater. ca.gov/WaterDataLibrary/Map.aspx. Accessed April 2024.
Dibblee, T.W., and Minch, J.A. 2005. Geologic map of the Milpitas Quadrangle, Alameda and Santa Clara and Counties, California: Dibblee Geological Foundation, Dibblee Foundation Map DF-1531, scale 1:24,000. Viewed at: https://ngmdb.usgs.gov/Prodesc/proddesc_71767.htm. Accessed April 2024.
Helley, E.J., 1990, Preliminary contour map showing elevation of surface of Pleistocene alluvium under Santa Clara Valley, California: U.S. Geological Survey Open-File Report 90 -633, scale 1:24,000. https://pubs.er.usgs.gov/publication/ofr90633. Accessed April 2024.
NRCS (Natural Resources Conservation Service). 2024. Web Soil Survey, Project Area Map and Data. https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx. Accessed April 2024.
SCCVWD (Santa Clara County Valley Water District). 2024. Your Water – Subsidence. https://www. valleywater.org/your-water/groundwater/subsidence. Accessed April 2024.
Society of Vertebrate Paleontology. 2010. Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources. https://vertpaleo.org/wp- content/uploads/2021/ 01/SVP_Impact_Mitigation_Guidelines-1.pdf. Accessed April 2024.
USGS (United States Geological Survey). 2024a. Land Subsidence in the Santa Clara Valley. https://www. usgs.gov/centers/land-subsidence-in-california/science/land-subsidence-santa-clara-valley .
Accessed April 2024.
_____. 2024b. Earthquake Hazards Program, 2008 National Seismic Hazard Maps - Sour ce Parameters. https://earthquake.usgs.gov/cfusion/hazfaults_2008_search/query_main.cfm. Accessed April 2024.
_____. 2024c. Earthquakes Hazard Program, Earthquake Catalog Search. https://earthquake.u sgs.gov/ earthquakes/search/. Accessed April 2024.
USGS and CGS (United States Geological Survey and California Geological Survey). 2024. Quaternary Fault and Fold Database of the United States KML files. https://www.us gs.gov/programs/earthquake- hazards/faults. Downloaded April 2024.
Youd, T.L. and D.M. Perkins. 1978. Mapping Liquefaction Induced Ground Failure Potential, in the Proceedings of the American Society of Civil Engineers, Journal of the Geotechnical Engineering Division.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-7 ADMINISTRATIVE DRAFT MND/IS
5.8 Greenhouse Gas Emissions
CARB (Air Resources Board). 2023. California Greenhouse Gas Emissions for 2000-2021: Tends of Emissions and Other Indicators. December 14, 2023. https://ww2.arb.ca.gov/ghg-inventory-data.
Accessed April 25, 2024.
_____. 2022. California’s Scoping Plan for Achieving Carbon Neutrality. November 16, 2022. https://ww2. arb.ca.gov/sites/default/files/2022-12/2022-sp.pdf. Accessed April 25, 2024.
BAAQMD. 2022. CEQA Air Quality Guidelines. https://www.ba aqmd.gov/plans-and-climate/california- environmental-quality-act-ceqa/updated-ceqa-guidelines. Accessed May 5, 2024.
IPCC (Intergovernmental Panel on Climate Change). 2022. Chapter 2: Emissions trends and drivers.
Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge, UK and New York, NY, USA. https:// www.ipcc.ch/report/ar6/wg3/chapter/chapter-2/. Accessed April 25, 2024.
OEHHA (Office of Environmental Health Hazard Assessment, California Environmental Protection Agency). 2018. Indicators of Climate Change in California. May. https://oehha.ca.go v/media/downloads/ climate-change/report/2018caindicatorsreportmay 2018.pdf. Accessed April 25, 2024.
5.9 Hazards and Hazardous Materials
City of Santa Clara. 2014. City of Santa Clara General Plan – Chapter 5: Goals and Policies. https://www. santaclaraca.gov/home/showpublisheddocument/13934/635729106120730000. Accessed April 2024.
OEM (Office of Emergency Management). 2022. County of Santa Clara Emergency Operations Plan.
Ja
nuary 2022. https://emergencymanagement.sccg ov.org/sites/g/files/exjcpb261/files/docu ment/2022%20EOP_County%20of%20Santa%20Clara_01.20.2022%20Accessibility%20Check. pdf. Accessed June 2024.
DTSC (California Department of Toxic Substances Control). 2024a. EnviroStor Database. https://www. envirostor.dtsc.ca.gov/public/map/?myaddress=santa+clara. Accessed April 2024. _____. 2024b. EnviroStor database. “Cortese List Data Resources.” https://www.en virostor.dtsc.ca.gov/ public/search?cmd=search&reporttype=CORTESE&site_type=CSITES,FUDS&status=ACT,BKLG, COM&reporttitle=HAZARDOUS+WASTE+AND+SUBSTANCES+SITE+LIST+%28CORTESE%29.
Accessed April 2024.
OSFM (Office of the State Fire Marshal). 2024. Frequently Asked Questions About: 2023 Fire Hazard Se
verity Zones., Updated March 11, 2024. https://34c031f8-c9fd- 4018-8c5a-4159cdff6b0d-cdn- endpoint.azureedge.net/-/media/osfm-website/what-we-do/community-wildfire-preparedness- and-mitigation/fire-hazard-severity-zones/fire-hazard-severity-zones-map/2023-fhsz-faqs- march-11-2024.pdf?rev=4652b9617dec4dceac0e6443b19cfe8f&hash= 9C503ABC051104ECE7CC0E7ECCB5FDE0. Accessed April 2024.
_____. 2024b. Santa Clara County, Fire Hazard Severity Zone Viewer. https://experience.a rcgis.com/ experience/03beab8511814e79a0e4eabf0d3e7247/. Accessed April 2024.
SCCALUC (Santa Clara County Airport Land Use Commission). 2024. Airport Land Use Compatibility Plan, Santa Clara County, San Jose Mineta International Airport. https://stgenpln.b lob.core.windows. net/document/ALUC_SJC_CLUP.pdf. Accessed April 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-8 ADMINISTRATIVE DRAFT MND/IS
SWRCB (State Water Resources Control Board). 2024. State Water Resources Control Board GeoTracker, https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=santa+clara.
Accessed April 2024.
5.10 Hydrology and Water Quality
City of Santa Clara. 2014. City of Santa Clara General Plan – Chapter 5: Goals and Policies. http://santa claraca.gov/home/showdocument?id=13934. Accessed March 2024.
DWR (California Department of Water Resources). 2003. Bulletin 118 Update 2003 – Basin Report 2_009_
02. https://data.cn ra.ca.gov/dataset/bulletin-118-update-2003-basin-reports/resource/20296ca 3-a155-4285-8786-b775b89b9033. Accessed March 2024.
_____. 2024. Bulletin 118 Groundwater Basin Boundaries Dataset. https://data.cn ra.ca.gov/dataset/i08- b118-ca-groundwaterbasins. Accessed March 2024.
FEMA (Federal Emergency Management Agency). 2009. Online flood map 06085C0064H, effective 05/18/2009. https://msc.fema.gov/portal/search?AddressQuery=santa%20clara. Accessed March 2024.
SWRCB (State Water Resources Control Board). 2018. Final California 2018 Integrated Report (303(d) Li
st/305(b) Report), Supporting Information Regional Board 2 – San Francisco Bay Region, Water Body Name: Saratoga Creek. https://www.waterboards.ca.go v/water_issues/programs/water_ quality_assessment/2018_integrated_report.html. Accessed March 2024.
5.11 Land Use and Planning
City of Santa Clara. 2014. City of Santa Clara General Plan – Chapter 5: Goals and Policies. http://santa claraca.gov/home/showdocument?id=13934. Accessed March 2024. _____. 2023a. MAP Santa Clara, Zoning Map. Updated January 1, 2023. https://www.sant aclaraca.gov/ our-city/departments-a-f/community-development/planning-division/map-santa-clara.
Accessed March 2024.
_____. 2023b. Title 18 - Zo ning Code. December 2023. [Online]: https://www.sant aclaraca.gov/home/ showpublisheddocument/82067/638386835249500000
5.12 Mineral Resources
CDOC (California Department of Conservation). 1996. Update of Mineral Land Classification: Aggregate Materials in the South San Francisco Bay Production-Consumption Region. DMG Open-File Report 96-03. Downloaded from: https://maps.co nservation.ca.gov/cgs/informationwarehouse/index. html?map=mlc. Accessed April 2024.
_____. 2024a. CGS Information Warehouse: Mineral Land Classification. https://maps.co nservation.ca. gov/cgs/informationwarehouse/index.html?map=mlc. Accessed April 2024. _____. 2024b. SMARA Statutes and Regulations. https://www.co nservation.ca.gov/dmr/lawsandregu lations. Accessed April 2024.
Google Earth. 2024. Identification of CEMEX Concrete Plant south of Montague Expressway. https://earth. google.com/web/search/CEMEX+Santa+Clara+Concrete+Plant,+Russell+Avenue,+Santa+Clara,+ CA/@37.38681316,-121.95740583,6.58677683a,1891.91957173d,35y,359.99980199h,0t,0r/ data=Cq0BGoIBEnwKJTB4ODA4ZmM5OWFlYWU0MzJiZDoweGQxZmJiZGZjMWQ3NjU4NGMZY npnWZyxQkAhsyodBzl9XsAqQUNFTUVYIFNhbnRhIENsYXJhIENvbmNyZXRlIFBsYW50LCBSdXNzZ NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-9 ADMINISTRATIVE DRAFT MND/IS
WxsIEF2ZW51ZSwgU2FudGEgQ2xhcmEsIENBGAIgASImCiQJ-NQjAbUCQ0AR-1fmKccBQ0AZS7- 1SBxAXsAhyiI8v61AXsA6AwoBMA. Accessed June 2024.
USGS (United States Geological Survey). 2024. Mineral Resources Data System. https://mrdata.u sgs.gov/ mrds/. Accessed April 2024
5.13 Noise
City of Santa Clara. 2014. City of Santa Clara 2010 2035 General Plan. City Council adopted on November 16, 2010. Updated December 9, 2014. https://www.sant aclaraca.gov/our-city/departments-a-f/ community-development/planning-division/general-plan. Accessed April 3, 2024.
FHWA (Federal Highway Administration). 2006. Roadway Construction Noise Model, User’s Guide. January. http://www.fhwa.dot.gov/environment/noise/construction_noise/rcnm/rcnm.pdf. Accessed April 3, 2024.
OPR (Governor’s Office of Planning and Research). 2017. General Plan Guidelines: 2017 Update. Updated Sep
tember 2017. http://www.opr.ca.gov/planning/general-plan/guidelines.html. Accessed April 3, 2024.
U.S. EPA (U.S. Environmental Protection Agency). 1974. Information on Levels of Environmental Noise Re
quisite to Protect Public Health and Welfare with an Adequate Margin of Safety. No. 550/ 9 74 004, Washington, D.C.
5.14 Population and Housing
City of Santa Clara. 2014a. City of Santa Clara General Plan – Chapter 5: Goals and Policies. http:// santaclaraca.gov/home/showdocument?id=13934. Accessed March 2024. _____. 2014b. City of Santa Clara General Plan – Appendix 8.12 Housing Element. https://www.sant aclara ca.gov/home/showpublisheddocument/13932/635713044859030000. Accessed March 2024. _____. 2023. MAP Santa Clara, Zoning Map. Updated January 1, 2023. https://www.san taclaraca.gov/our- city/departments-a-f/community-development/planning-division/map-santa-clara. Accessed March 2024.
California Department of Finance (CA DOF). 2023. E -5 Population and Housing Estimates for Cities, Counties, and the State, January 2021 -2023, with 2020 Benchmark. Updated May 2023. https:// dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimates-for- cities-counties-and-the-state-2020-2023/. Accessed March 2024.
California Employment Development Department (CA EDD). 2023. Labor Force and Unemployment Rate for Cities and Census Designated Places – 2023 Annual Average. https://labormarketinfo.ed d.ca. gov/data/labor-force-and-unemployment-for-cities-and-census-areas.html. Accessed March 2024.
5.15 Public Services
City of Santa Clara. 2011. City of Santa Clara Draft 2010-2035 General Plan – Integrated Final Environ - mental Impact Report, Volume I EIR Text. https://www.sant aclaraca.gov/our-city/departments- a-f/community-development/planning-division/general-plan. Accessed March 2024. _____. 2014a. City of Santa Clara General Plan – Chapter 5: Goals and Policies. http://santaclaraca.go v/ home/showdocument?id=13934. Accessed March 2024.
NRS-KRS 115KV TRANSMISSION LINE PROJECT
JULY 2024 B-10 ADMINISTRATIVE DRAFT MND/IS
_____. 2024a. Parks. https://www.sant aclaraca.gov/our-city/departments-g-z/parks-recreation/parks- pools/parks. Accessed March 2024.
_____. 2024b. Agnews Historic Park. https://www.sant aclaraca.gov/Home/Components/ServiceDirect ory/ServiceDirectory/321/2654. Accessed March 2024.
_____. 2024c. City of Santa Clara: Public Safety; Fire Stations and Police Stations within Santa Clara. https://missioncity.map s.arcgis.com/apps/MapTour/index.html?appid=15779cefd9bc463d8bc 6229b61d921d5. Accessed March 2024.
_____. 2024d. Santa Clara Police Department – Fact Sheet. Updated February 15, 2024. https://www.s anta claraca.gov/our-city/departments-g-z/police-department/about-us/fact-sheet. Accessed March 2024.