EXHIBIT “D”

CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

ASF ELECTRIC, INC.

By: _________________________
Signature

_________________________
Name (Print)

_________________________
Title (Print)

---

Page 28 of 40 ends

EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract enter ed into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code Sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
1 Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:
 Contractor shall maintain a current DIR registration for the duration of the project.  Contractor shall include the requirements of Labor Code Sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.  Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor
Signature
Name and Title
D a t e d

1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

Page 29 of 40 ends

EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

ATTACHED BEHIND THIS PAGE

Page 30 of 40 ends

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter referred to as “Stadium Manager”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by sa id Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the Stadium Manager in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein s pecified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the Indemnified Parties, as stipulated and defined in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by Stadium Manager, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the Stadium Manager from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains.

Nothing herein shall limit the Stadium Manager’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the Stadium Manager to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Stadium Manager’s option:

Page 31 of 40 ends

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the Stadium Manager, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the Stadium Manager to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the Stadium Manager may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the Stadium Manager, when declaring the Contractor in default, notifies Surety of the Stadium Manager’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

Page 32 of 40 ends

(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 33 of 40 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certif icate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

Page 34 of 40 ends

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter designated as the “Stadium Manager”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the Stadium Manager in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SU CH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or

Page 35 of 40 ends

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or Stadium Manager and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

(Corporate Seal) Surety
By
Attorney-in-Fact
T i t l e

Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 36 of 40 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certif icate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

Page 37 of 40 ends

EXHIBIT “G”

RATE SCHEDULE

Year One: April 1, 2026 - March 31, 2027
Straight-
Time
Weekday Daily OT
Saturday
DT
Sunday
&
Holiday
DT
Journey Level:

Inside Wireman, Technician (Foreman)

$227.00 $297.37 $372.28 $372.28

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $138.50 $181.44 $227.14 $227.14 Electrician, Inside Wireman - (6th Period) $148.00 $193.88 $242.72 $242.72 Electrician, Inside Wireman - (7th Period) $157.42 $206.22 $258.17 $258.17 Electrician, Inside Wireman - (8th Period) $166.35 $217.92 $272.81 $272.81 Electrician, Inside Wireman - (9th Period) $174.03 $227.98 $285.41 $285.41 Electrician, Inside Wireman - (10th
Period)
$180.00 $235.80 $295.20 $295.20

Materials & Consumables Mark-Up 10%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3%
One Time Start Up Costs
(Applicable to only Year One)

2,500.00

Year Two: April 1, 2027 - March 31, 2028
Straight-
Time
Weekday Daily OT
Saturday
DT
Sunday
&
Holiday
DT
Journey Level:

Inside Wireman, Technician (Foreman)

$233.81 $306.29 $383.45 $383.45

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $142.66 $186.88 $233.95 $233.95 Electrician, Inside Wireman - (6th Period) $152.44 $199.70 $250.00 $250.00 Electrician, Inside Wireman - (7th Period) $162.14 $212.41 $265.91 $265.91 Electrician, Inside Wireman - (8th Period) $171.34 $224.46 $281.00 $281.00 Electrician, Inside Wireman - (9th Period) $179.25 $234.82 $293.97 $293.97 Electrician, Inside Wireman - (10th
Period)
$185.40 $242.87 $304.06 $304.06

Materials & Consumables Mark-Up 10%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3% 11

Page 38 of 40 ends

Year Three: April 1, 2028 - March 31, 2029
Straight-
Time
Weekday Daily OT
Saturday
DT
Sunday
&
Holiday
DT
Journey Level:

Inside Wireman, Technician (Foreman)

$240.82 $315.48 $394.95 $394.95

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $146.93 $192.48 $240.97 $240.97 Electrician, Inside Wireman - (6th Period) $157.01 $205.69 $257.50 $257.50 Electrician, Inside Wireman - (7th Period) $167.01 $218.78 $273.89 $273.89 Electrician, Inside Wireman - (8th Period) $176.48 $231.19 $289.43 $289.43 Electrician, Inside Wireman - (9th Period) $184.63 $241.86 $302.79 $302.79 Electrician, Inside Wireman - (10th
Period)
$190.96 $250.16 $313.18 $313.18

Materials & Consumables Mark-Up 10%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3%

I. Pricing Structure and Requirements

1. Billable Labor Rates
a. Contractor shall be paid at the hourly rate specified above. These rates are fully burdened, including all fringe benefits, profit, and overhead markups.

b. Definitions:
i. Daily Overtime: The rate applied for the first two hours worked beyond the standard 8-hour mark. This rate is applicable only to weekday work and excludes all Saturday, Sunday, and Holiday rates.
ii. Saturday: Fully burdened Saturday overtime hourly rate, inclusive of all fringe benefits.
iii. Sunday & Holiday: Fully burdened Sunday and Holiday overtime hourly rate, inclusive of all fringe benefits

2. Materials and Consumables
a. Materials (which include replacement parts, new components such as panel boards, transformers, etc., but does NOT include the cost of small tools) and consumables, which are “minor” materials actually “consumed” during the course of work (such as caulking, solder, tape, etc.) shall be provided to the Stadium Manager at the Contractor’s “cost” (meaning what the Contractor paid the supplier) plus an agreed upon mark-up percentage, which would include handling, storage, etc. b. When the Contractor is invoicing for specific task orders, and that invoice includes materials costs, Stadium Manager, at its discretion, may require invoices documenting what the Contractor paid for said materials. 11

Page 39 of 40 ends

c. Where an individual repair part, or component, costs in excess of $1,500, the Contractor is required to get quotes from at least two separate suppliers and provide copies of these quotes to Stadium Manager.
d. If Stadium Manager issues an “emergency” task order, this requirement may be waived if Stadium Manager authorizes it.

3. Equipment Rental
a. If the Contractor must rent equipment in order to accomplish a Task Order, the price of that equipment to Stadium Manager shall be the Contractor’s actual invoice cost for that equipment, plus an agreed upon mark-up percentage. b. If the Contractor owns equipment, then reimbursement for use of that equipment is to be covered in the Contractor’s overall Overhead and Profit mark-up, which is a component of the Contractor’s billable hourly rates described above.

4. Permit Fees
a. All permit fees shall be pass through charges billed to the Stadium Manager for actual documented costs charged without markup.

5. Pricing Review Schedule
a. The agreed upon rates and mark-up percentages are firm for the initial three-year term of the agreement, subject only to the prevailing wage adjustment provisions set forth in Bullet C.
b. Contractor may request adjustments to the billable labor rates on each optional one- year options to renew the agreement after the initial term. c. Increases shall not exceed 3% annually, unless applicable prevailing wage rate increases by more than 3%.
d. All price adjustments are subject to Stadium Manager’s written approval. The Contractor must provide documentation that demonstrates to the Stadium Manager's satisfaction a price increase is warranted.

II. Invoicing Requirements
Stadium Manager is using Coupa, a business spends management platform. All purchase orders, invoices, and payments will be handled electronically using the Coupa Supplier Portal. Contractor shall work with Stadium Manager to establish all account information necessary to process payments under this Contract via the Coupa Supplier Portal.

---

Page 40 of 40 ends

EXHIBIT “H”

SAMPLE TASK ORDER FORM

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

TASK ORDER

Task Order No. ______
Contract: [INSERT NAME OF CONTRACT]
Contractor: [INSERT NAME OF CONTRACTOR]
The Contractor is hereby authorized to perform the following work subject to the provisions of the Contract identified above:

List any attachments: [INSERT ATTACHMENTS, IF ANY]
Dollar Amount of Task Order: Not to exceed $_____,_____.00 Liquidated Damages for this Task Order: $XXX per day.

Completion Date: ____________, 20___
The undersigned Contractor hereby agrees that it will provide all equipment, furnish all materials, except as may be otherwise noted above, and perform all work specified above in accordance with the Contract identified above and will accept as full payment therefore the amount shown above.

FORTY NINERS STADIUM

MANAGEMENT COMPANY LLC

[INSERT CONTRACTOR NAME]
D a t e d : Dated:

B y : B y :

-
•
Agreement No: xxx

Page 1 of 42 ends

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

LEVI’S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR CONTRACT

1. P ARTIES AND DATE.

This Contract is made and entered into this [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***] by and between the Forty Niners Stadium Management Company LLC, a Delaware limited liability company (“Stadium Manager”) and Bear Electrical Solutions, LLC, a California limited liability company with its principal place of business at 1252 State Street, Alviso, CA 95002 (“Contractor”). Stadium Manager and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. R ECITALS.

2.1 Stadium Manager. Stadium Manager seeks to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain maintenance and repair services required by the Stadium Manager on the terms and conditions set forth in this Contract and in the task order(s) to be issued pursuant to this Contract and executed by the Stadium Manager and Contractor (“Task Order”). Contractor represents that it is duly licensed and experienced in providing Levi’s Stadium On-Call Stadium Electrical related maintenance and repair services, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of Stadium Manager. The following license classifications are required for this Project: C-10 Electrical Contractor.

2.3 Project. Stadium Manager desires to engage Contractor to render such services for the On-Call Stadium Electrical Maintenance and Repair (“Project”) as set forth in this Contract on an on-call, as-needed basis. There is no guarantee of any of work under this Contract other than what is specified herein or that the not-to-exceed compensation amount set forth herein will be spent.

2.4 Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, a performance bond, a pa yment bond, and all insurance documentation, as required by the Contract.

3. T ERMS

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
• Scope of Work (Exhibit “A”)
• Plans and Specifications (Exhibit “B”)
• Special Conditions (Exhibit “C”)
• Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”) • Public Works Contractor Registration Certification (Exhibit “E”) • Payment and Performance Bonds (Exhibit “F”)
• Rate Schedule (Exhibit “G”)
•
- -
Agreement No: xxx

Page 2 of 42 ends

• Sample Task Order Form (Exhibit “H”)
• Addenda
• Change Orders executed by the Stadium Manager
• 2018 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
• Notice Inviting Bids, if any
• Instructions to Bidders, if any
• Contractor’s Bid, if any

3.2 Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the Stadium Manager all labor, materials, tools, equipment, services, and incidental and customary work necessary for the Project (hereinafter sometimes referred to as the “Work”). The type of Work to be provided is described in Exhibit “A” attached hereto and incorporated herein by reference and in the individual Task Orders issued by the Stadium Manager. No Work shall be performed unless authorized by this Contract and by a fully executed Task Order in the form attached hereto as Exhibit “H”. All Work shall be subject to, and performed in accordance, with this Contract, any relevant Task Order, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the Stadium Manager.

Should Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the Stadium Manager may direct the Contractor to proceed with the performance of the change on a time and materials basis.

3.2.2 Substitutions/“Or Equal”. Pursuant to Public Contract Code Section 3400(b), the Stadium Manager may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Spec ifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the Stadium Manager may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the repair schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract.

Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request •
Agreement No: xxx

Page 3 of 42 ends

is rejected, Contractor shall be responsible for providing the specified material, process or article.

The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The Stadium Manager has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted.

Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the Stadium Manager in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the Stadium Manager’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code Section 3400.

3.3 Period of Performance and Liquidated Damages. The term of this Contract shall commence on the date first set forth above and expire on [MONTH DAY, 2029], unless earlier terminated as provided herein. Contractor shall complete the Work within the term of this Contract, and shall meet any other established schedules and deadlines set forth in the Task Order(s). All applicable indemnification provisions of this Contract shall remain in effect following the termination of this Contract. The Parties may, by mutual, written consent, further extend the term of this Contract for two (2) additional one (1) year periods. Pursuant to Government Code Section 53069.85, Contractor shall pay to the Stadium Manager as fixed and liquidated damages a fixed dollar amount per day for each and every calendar day of delay beyond any completion schedule, repair schedule or Project milestones established pursuant to the Contract and any Task Order(s). The daily liquidated damages amount will be determined for each separate Task Order and will be set forth in that Task Order.

3.4 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform t he Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. Contractor shall perform, at its own cost and expense and without reimbursement from the Stadium Manager, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the Stadium Manager to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the Stadium Manager, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.
•
Agreement No: xxx

Page 4 of 42 ends

3.5 Control and Payment of Subordinates; Contractual Relationship. Stadium Manager retains Contractor on an independent contractor basis and Contractor is not an employee of Stadium Manager. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 Stadium Manager’s Basic Obligation. Stadium Manager agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the Stadium Manager shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below-referenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, Contractor shall receive compensation, including authorized reimbursements, for all Work rendered under this Contract at the rates set forth in Exhibit “G” attached hereto and incorporated herein by reference. The maximum compensation for Work to be provided pursuant to each Task Order shall be set forth in the relevant Task Order. The total compensation to be provided under this Contract by Stadium Manager to Contractor, in the aggregate, shall not exceed Two Hundred Fifty Thousand Dollars ($250,000.00) (“Total Contract Price”) per contract year without the written approval of the Stadium Manager. The term for subsequent fiscal years shall be conditioned upon approval of the Stadium Authority budget for the applicable fiscal year that includes the amounts under this Contract.

3.7.2 Payment of Compensation. Contractor shall submit to Stadium Manager a monthly itemized statement which indicates Work completed by Contractor in a format acceptable to the Stadium Manager. The statement shall describe the amount of Work and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. These statements shall be supported by evidence which is required by this Contract and such other documentation as the Stadium Manager may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated.

3.7.3 Prompt Payment. Stadium Manager shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Deductions and Withholdings. The Stadium Manager may deduct from each progress payment an amount necessary to protect Stadium Manager from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the Stadium Manager in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective •
Agreement No: xxx

Page 5 of 42 ends

Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by Stadium Manager during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the Stadium Manager, incurred by the Stadium Manager for which Contractor is liable under the Contract; and (11) any other sums which the Stadium Manager is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the Stadium Manager to deduct any of these sums from a progress payment shall not constitute a waiver of the Stadium Manager’s right to such sums.

3.7.5 Substitutions for Contract Deductions and Withholdings. In accordance with California Public Contract Code Section 22300, the Stadium Manager will permit the substitution of securities for any monies withheld by the Stadium Manager to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the Stadium Manager, or with a state or federally chartered bank in California as the escrow agent, and thereafter the Stadium Manager shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the Stadium Manager has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the Stadium Manager.

3.7.6 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the Stadium Manager, or its designee, at the time of payment. To the extent that title has not previously been vested in the Stadium Manager, or its designee, by reason of payments, full title shall pass to the Stadium Manager, or its designee, at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the Stadium Manager or its designee, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.7 Labor and Material Releases. Contractor shall furnish Stadium Manager with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by Stadium Manager.

3.78 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation •
Agreement No: xxx

Page 6 of 42 ends

is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Stadium Manager shall provide Contractor with a copy of t he prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any cl aim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.7.9 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said Section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.7.10 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3.7.11 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code Section 1776. In the event of noncompliance with the requirements of this Section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this Section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this Section is on Contractor. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.7.12 Contractor and Subcontractor Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the •
Agreement No: xxx

Page 7 of 42 ends

Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.7.13 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the Stadium Manager. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arisi ng out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.8 Performance of Work; Jobsite Obligations.

3.8.1 Water Quality Management and Compliance, if Applicable.

3.8.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State.

3.8.1.2 Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity wh ich results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires t he SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.
•
Agreement No: xxx

Page 8 of 42 ends

3.8.1.3 Other Water Quality Rules Regulations and Policies.

Contractor shall comply with the lawful requirements of any applicable municipality, drainage Stadium Manager, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

3.8.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during repair of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

3.8.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the Indemnified Parties (defined below) for any alleged violations. In addition, Stadium Manager may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit.

3.8.1.6 Reservation of Right to Defend. Stadium Manager reserves the right to defend any enforcement action brought against the Stadium Manager for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy.

Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the Stadium Manager for the costs (including the Stadium Manager’s attorney’s fees) associated with, any settlement reached between the Stadium Manager and the relevant enforcement entity.

3.8.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by Stadium Manager, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under this Contract. Upon request, Stadium Manager will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing •
Agreement No: xxx

Page 9 of 42 ends

in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.8.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the Stadium Manager in writing. Any necessary changes shall be made by written c hange order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the Stadium Manager, Contractor shall be solely responsible for all costs arising therefrom.

Contractor shall defend, indemnify and hold Indemnified Parties (defined below) free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.8.4 Permits and Licenses. Contractor shall be responsible for securing Stadium Manager permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.8.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for Stadium Manager’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify Stadium Manager of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by Stadium Manager; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, Stadium Manager shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.8.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, Stadium Manager shall compensate Contractor for the costs of:
(1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the drawings; and (3) equipment necessarily idled during such work. Contractor •
Agreement No: xxx

Page 10 of 42 ends

shall not be assessed liquidated damages for delay caused by failure of Stadium Manager to provide for removal or relocation of such utility facilities.

3.8.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements ar e broader, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel-pow ered engine. Contractor shall indemnify the Indemnified Parties (defined below) against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for w hom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.8.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify Stadium Manager in writing and shall furnish all labor and material releases required by this Contra ct. Stadium Manager shall thereupon inspect the Work. If the Work is not acceptable to the Stadium Manager, the Stadium Manager shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the Stadium Manager. Once the Work is acceptable to Stadium Manager, Stadium Manager shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which Stadium Manager may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.10 Claims; Government Code Claim Compliance.

3.10.1 Arbitration. All disputes between Contractor and Stadium Manager relating in any way to this Agreement or Services performed under this Agreement (including, but not limited to, claims for breach of contract, tort, discrimination, harassment and any violation of federal or state law, regulation or constitution) (“Arbitrable Claims”) shall be resolved by binding arbitration under the Federal Arbitration Act, in conformity with the procedures of the California Arbitration Act (Cal. Code Civ. Proc. § 1280 et seq., including § 1283.05 and all of the Act’s other mandatory and permissive rights to discovery). In addition to any other requirements imposed by law, the arbitrator selected shall be a retired California Superior Court Judge, or otherwise qualified individual to whom the parties mutually agree, and shall be subject to disqualification on the same grounds as would apply to a judge of such court. All rules of pleading (including the right of demurrer), all rules of discovery, all rules of evidence, all rights to resolution of the dispute by means of motions for summary judgment, judgment on the pleadings and all other dispositive motions, and judgment under Code of Civil Procedure § 631.8 shall apply and be observed.

Resolution of the dispute shall be based solely upon the law governing the claims and defenses pleaded, and the arbitrator may not invoke any basis other than such controlling law. The arbitrator shall have the immunity of a judicial officer from civil liability when acting in the capacity of an arbitrator, which immunity supplements any other existing immunity. Likewise, all communications during or in connection with the arbitration proceedings are privileged in accordance with Cal. Civil Code § 47(b). As reasonably required to allow full use and benefit of •
Agreement No: xxx

Page 11 of 42 ends

this agreement’s modifications to the Act’s procedures, the arbitrator shall extend the times set by the Act for the giving of notices and setting of hearings. Awards shall include the arbitrator's written reasoned opinion. The Parties understand and agree to this binding arbitration provision, and both Contractor and Stadium Manager give up their right to trial by jury of any claim they may have against each other.

3.11 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by Stadium Manager. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the Stadium Manager may terminate this Contract pursuant to Section 3.17.3; provided, however, that the Stadium Manager needs to provide Contractor with only one (1) day advanced written notice.

3.12 Indemnification.

3.12.1 Scope of Indemnity . To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the Stadium Manager, the Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, empl oyees, agents and authorized volunteers, each tenant and event promoter of Levi’s Stadium, and any mortgagee, bond trustee or other financial institution from time to time holding a line or indenture upon an interest in Levi’s Stadium, and each of them (collectively, the “Indemnified Parties”), free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project, this Contract or any Task Order, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code Section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the Indemnified Parties or the Indemnified Parties’ agents, servants, or independent contractors who are directly responsible to the Indemnified Parties, or for defects in design furnished by those persons.

3.12.2 Additional Indemnity Obligations . Any defense to be provided by Contractor pursuant to any indemnification provision of this Agreement shall be by counsel approved by Stadium Manager, which approval shall not be unreasonably withheld. To the extent any of the Indemnitees incurs costs or expenses to enforce this indemnification (including attorneys' fees and expenses), Contractor shall reimburse the Indemnitee for such costs and expenses.

3.13 Insurance.

3.13.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the Stadium Manager that it has secured all insurance required under this Section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the Stadium •
Agreement No: xxx

Page 12 of 42 ends

Manager that the subcontractor has secured all insurance required under this Section. Failure to provide and maintain all required insurance shall be grounds for the Stadium Manager to terminate this Contract for cause.

3.13.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.13.2.1 Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01); (2) Automobile Liability:

Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); and (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.

3.13.2.2 Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $2,000,000 per occurrence and $4,000,000 aggregate for bodily injury, personal injury and property damage; (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California.

Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Defense costs shall be available in addition to the limits.

Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.13.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the Stadium Manager to add the following provisions to the insurance policies:

3.13.3.1 General Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 10 01 plus CG20 37 10 01, or endorsements providing the exact same coverage, with respect to the Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying co verage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it. •
Agreement No: xxx

Page 13 of 42 ends

3.13.3.2 Automobile Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying co verage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.

3.13.3.3 Workers’ Compensation and Employer’s Liability Coverage.

The insurer shall agree to waive all rights of subrogation against the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.13.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the Stadium Manager; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers.

3.13.3.5 Contractor’s Equipment Insurance. Contractors Equipment Insurance applying to loss or damage on an “all risk” basis to any equipment, small tools, or other machinery whether owned, leased, rented, borrowed or otherwise in the care, custody and control of the Contractor for use in the performance of Work. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy.

3.13.4 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the Stadium Manager, its officials, employees, agents and authorized volunteers.

3.13.5 Deductibles and Self-Insurance Retentions. Any deductibles or self- insured retentions must be declared to and approved by the Stadium Manager. Contractor shall guarantee that, at the option of the Stadium Manager, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the Stadium Manager, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the Stadium Manager guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses. •
Agreement No: xxx

Page 14 of 42 ends

3.13.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VII, licensed to do business in California, and satisfactory to the Stadium Manager. Exception may be made for the State Compensation Insurance Fund when not specifically rated.

3.13.7 Verification of Coverage. Contractor shall furnish Stadium Manager with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the Stadium Manager. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the Stadium Manager. All certificates and endorsements must be received and approved by the Stadium Manager before work commences. The Stadium Manager reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.13.8 Subcontractors. All subcontractors shall meet the requirements of this Section before commencing Work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the Stadium Manager, its officials, em ployees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the Stadium Manager in writing.

3.13.9 Reporting of Claims. Contractor shall report to the Stadium Manager, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

3.14 Bond Requirements.

3.14.1 Payment Bond. If required by law or otherwise specifically requested by Stadium Manager in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concu rrently with this Contract a Payment Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.2 Performance Bond. If specifically requested by Stadium Manager in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concurrently with this Cont ract a Performance Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.3 Bond Provisions. Should, in Stadium Manager’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from Stadium Manager. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the Stadium Manager, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the Stadium Manager. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request •
Agreement No: xxx

Page 15 of 42 ends

of the Stadium Manager, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the Stadium Manager. If Contractor fails to furnish any required bond, the Stadium Manager may terminate the Contract for cause.

3.14.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the Stadium Manager.

3.15 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the Stadium Manager of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the Stadium Manager in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one-year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the Stadium Manager may require to verify that any corrective actions, including, without lim itation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the Stadium Manager, regardless of whether or not such warranties and guarantees have been transferred or assigned to the Stadium Manager by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the Stadium Manager. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the Stadium Manager, the Stadium Manager shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the Stadium Manager for any expenses incurred hereunder upon demand.

3.16 Employee/Labor Certifications.

3.16.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.
•
Agreement No: xxx

Page 16 of 42 ends

3.16.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not di scriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.16.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.

3.17 General Provisions.

3.17.1 Stadium Manager’s Representative. The Stadium Manager hereby designates the General Manager, or his or her designee, to act as its representative for the performance of this Contract (“Stadium Manager’s Representative”). Stadium Manager’s Representative shall have the power to act on behalf of the Stadium Manager for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the Stadium Manager’s Representative or his or her designee.

3.17.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the Stadium Manager (“ ′Contractor’s Representative”).

Following approval by the Stadium Manager, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor’s Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract and as described in the relevant Task Order. Contractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the Stadium Manager, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the Stadium Manager, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s R epresentative, Contractor shall provide the information specified above and obtain the Stadium Manager’s written approval.

3.17.3 Termination. This Contract may be terminated by Stadium Manager at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by Stadium Manager for any reason other than the fault of Contractor, Stadium Manager shall pay Contractor for all Work performed up to that time as provided herein.

In the event of breach of the Contract by Contractor, Stadium Manager may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset Stadium Manager’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, Stadium Manager may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

Further, if this Contract is terminated as provided, Stadium Manager may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract. •
Agreement No: xxx

Page 17 of 42 ends

3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contra ct or written or oral instructions from Stadium Manager, the matter shall be referred to Stadium Manager’s Representative, whose decision shall be binding upon Contractor.

3.17.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be directed to the regularly- monitored electronic mail address, read receipt requested, of such party as follows:

C
ONTRACTOR:

Attn: [***INSERT CONTRACTOR REP. NAME, TITLE]
[***INSERT CONTRACTOR NAME ***]
[***INSERT EMAIL ADDRESS***]

S
TADIUM MANAGER:

Francine Melendez Hughes, EVP and General Manager
Forty Niners Stadium Management Company LLC
[email protected]

With copy to:

Legal Affairs
Forty Niners Stadium Management Company LLC
[email protected]

Any such notice or communication shall be deemed to have been given on the day such notice or communication is sent electronically, provided the sender has received a confirmation of such electronic transmission. A Party may, for purposes of this Agreement, change its email address or the person to whom a notice or other communication is marked to the attention of, by giving notice of such change to the other Party pursuant to this Section 3.17.6.

3.17.7 Time of Essence. Time is of the essence in the performance of this Contract.

3.17.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of Stadium Manager. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, Stadium Manager may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.17.9 No Third-Party Beneficiaries. There are no intended third-party beneficiaries of any right or obligation assumed by the Parties.

3.17.10 Laws, Venue, and Attorneys’ Fees. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of Santa Clara, State of California. •
Agreement No: xxx

Page 18 of 42 ends

3.17.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.17.13 [Reserved]

3.17.14 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, Stadium Manager shall have the right to terminate this Contract without liability.

3.17.15 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, Stadium Manager shall have the right to rescind this Contract without liability. For the term of this Contract, no official, officer or employee of Stadium Manager, during the term of his or her service with Stadium Manager, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the Stadium Manager’s Filing Officer as required under state law in the performance of the Work.

3.17.16 Certification of License.

3.17.16.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.17.16.2 Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.17.17 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.17.18 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior •
Agreement No: xxx

Page 19 of 42 ends

negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.17.19 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.17.20 Stadium Manager’s Right to Employ Other Contractors. Stadium Manager reserves right to employ other contractors in connection with this Project or other projects.

[S
IGNATURES ON NEXT PAGE]

•
Agreement No: xxx

Page 20 of 42 ends

SIGNATURE PAGE FOR ON-CALL REPAIR CONTRACT

BETWEEN THE FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

AND BEAR ELECTRICAL SOLUTIONS, LLC

IN WITNESS WHEREOF, the Parties have en tered into this Contract as of the [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***].

FORTY NINERS STADIUM BEAR ELECTRICAL SOLUTIONS, LLC

MANAGEMENT COMPANY LLC

B y : B y :

Francine Melendez Hughes
EVP and General Manager Its:

P r i n t e d N a m e :

•

Page 21 of 42 ends

EXHIBIT “A”

SCOPE OF WORK
A. SCOPE OF WORK

Troubleshoot, repair, remove, and install electrical equipment and components, typically found in a large sports stadium such as Levi’s Stadium (“Stadium”), rated at less than 60KV.

This work will be performed via issuance of a Task Order (defined elsewhere in this solicitation). The work assigned to Contractor will be designated with one of the following “priority levels” which will indicate the urgency of the work and the Contractor’s response time:

Priority
Level
Type Response Time
1 - High Emergency – Hazardous, property
damage, and/or event required
support
Respond within 1 hour and
commence work as soon as
possible.
2 - Medium Systems Malfunction – Interruption
of daily operation
Respond within 2 hours and
commence work within 24 hours.
3 - Low Minor Repair Respond within 24 hours and
commence work within 72 hours, or
as determined necessary by the
Stadium Manager.

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required.

The Contractor shall maintain all necessary licenses to perform the work specified herein.

The Contractor will be responsible for supplying all necessary equipment (including aerial lifts), tools, consumables, material, labor, and supplies required to perform the work described herein.

Contractor will be tasked, by the Stadium Manager, with performing troubleshooting, repairing, and performing maintenance of various electrical systems at the Stadium, including but not limited to the following:

1. Electrical power work, and communications cabling, including, but not limited, to the following:
a. Power connections for electric-powered equipment;
b. Circuit breaker replacement;
c. Disconnect replacement;
d. Fuse replacement;
e. Conduit repair and installation, including PVC coated rigid conduit and fittings, PVC, flexible conduit, etc.;
f. Wire and electrical cable repair and installation, including copper, aluminum, all insulation, and wire types;

Page 22 of 42 ends

g. Transformer removal and replacement;
h. Sub-panel removal and replacement;
i. Electrical devices, including receptacles, switches, etc. Repair, removal, or replacement;
j. Motor, starters, controllers, and variable fr equency drives. Repair, removal, or replacement;
k. Automatic transfer switches;
l. UPS systems and clean power systems, low/medium voltage distribution systems, electrical grounding systems. Troubleshoot and repair; replace batteries as necessary;
m. Troubleshoot and repairs to back-up power systems;
n. Install or repair electric vehicle charging equipment; o. Repairs to computer power floor cables and connections, under carpet raceways, connections to electrified furniture partitions, electrical devices, and trim;
p. Work in electric duct banks; and
q. Fiber optic cable repair, replacement, installation. r. Maintenance repair and installation of low voltage equipment, including cameras, access controls, and A/V systems.

2. Lighting and physical security work, including, but not limited to, the following:
a. Indoor and outdoor lighting repairs and installations, including exterior pole mounted fixtures, and sports field lighting;
b. Cameras and access controls;
c. Lamp removal and replacement, including HID, fluorescent, incandescent, etc.; d. Ballast removal and replacement, including HID, fluorescent, etc.; e. Lighting fixture installation, all types;
f. Lighting control work. Contractors must have experience with a variety of lighting control systems, including Lutron and Crestron control systems; g. Provision of temporary lighting, as necessary; and
h. Conduit and related work for parking lighting, rolling gates, and other related electrical equipment.

3. Testing & Maintenance:
a. Arc Flash assessment;
b. Infrared inspection;
c. Coordination study;
d. Switch gear testing;
e. Emergency generator testing;
f. Power monitoring;
g. Motor control center cleaning; and
h. Ground fault testing.

4. Ancillary Services
a. Any services including, without limitation, other trade work that is incidental and/or supplemental to the performance of the primary services specified above.

B. GENERAL REQUIREMENTS

Page 23 of 42 ends

1. All work performed shall meet the latest revision of all applicable federal, state, and local regulations, laws, and codes.

2. All work schedules must be approved in writing by the Stadium Manager prior to commencement of work.

3. Unless otherwise specified, Contractor shall guarantee the labor and materials used are within the specified guidelines and recommendations of the manufacturer.

4. Materials furnished shall be new and shall be of commercial quality material. Used, reconditioned, or discontinued models and materials are not acceptable. The warranty period for contractor provided materials shall be for a period of one (1) year, or within the manufacturer warranty, whichever is longer. Such warranty shall commence upon the date of acceptance of Contractor’s work by the Stadium Manager.

5. The Stadium Manager reserves the right to supply all or part of the materials or equipment on any project/repair.

6. Contractor shall be responsible for the replacement of failed/defective equipment, and parts installed by Contractor that are under warranty. Such cost, if any, shall be incurred by Contractor. Contractor shall assume all liability for such defects.

7. Follow up work required to correct recent repair/improper repair, or substandard parts shall be at no charge to the Stadium Manager.

8. Contractor shall coordinate site access and Hot Work with Forty Niners Stadium Management Company Engineering Department prior to commencement of work.

9. Contractor shall complete a service tag/log after completion of work. Such tag or log must contain the following information:
a. Date of Service
b. Name of Technician(s)
c. Description of Service(s)

10. Contractor shall notify Stadium Manager when a recall is issued for any equipment or component serviced, installed, or repaired by Contractor. Notification by Contractor shall include the reasons for the recall, procedures for replacement, and the disposition of the recalled equipment.

11. Contractor is responsible for compliance with all building code requirements.

Independent of, or in addition, to any other legal requirements, the Stadium Manager may inspect and test Contractor’s work to determine if it conforms to the California Building Standards Code and local regulations, if applicable. The Stadium Manager will not accept Contractor's work unless it meets all applicable building code requirements.

12. The use of the safety equipment includes but is not limited to hard hats, eye protection, safety vests, hearing protection, fall protection, and safety boots as

Page 24 of 42 ends

required by the California Occupational Safety and Health Administration.

13. Contractor is required to provide personal protective equipment (PPE) to perform the work and follow the Public Health Orders issued by the Santa Clara County Health Department related to Novel Coronavirus (COVID-19). The Public Health Order updates can be accessed online at
https://www.sccgov.org/sites/covid19/Pages/public-health-orders.aspx

14. Contractor shall maintain all necessary licenses to perform the work specified herein.

15. Contactor shall be in compliance with applicable prevailing wage laws and the California Labor Code.

16. Contractor shall provide protection for all existing building components beneath and around the work. Any damage to existing building components caused by contractor shall be immediately repaired or replaced at contractor’s sole expense in a manner acceptable to and approved by Stadium Manager.

17. In all active work areas, contractor shall provide, install, and maintain all necessary barricades and warnings to prohibit pedestrian access into any affected work area.

This not only includes areas surrounding the work, but also includes areas below the work. Levi’s Stadium is an active building containing employees, guests, and other contractors on a daily basis. Contractor shall be responsible for keeping others out of its active work areas and preventing the exposure of others to grinding, sanding, scraping, paint drips, overspray, or any other material generated within the work area, both around and below.

18. Contractor will have a designated representative to oversee Contractor’s technicians assigned to perform the work specified herein. Contractor representative shall be responsible for providing all required documents, including, but not limited to, reports, invoices, as-built drawings, and all other project contract documents to the Stadium Manager.

19. Contractor shall assign a primary/secondary technician(s) as the main contact for the Stadium Manager during the term of the contract. If different representatives are designated during the term of the Contract, notice of any changes (including, but not limited to, name, address, e-mail, and telephone number) shall be promptly served in writing.

20. Contractor must obtain written authorization prior to commencement of work. The Stadium Manager will provide Contractor written approval by issuing a Notice to Proceed.

21. The Contractor shall perform the following to ensure a clean, safe work site:

a. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from project site. Secure, locate, and position all unused materials and equipment, including man lifts, to the satisfaction of Stadium Manager.

Page 25 of 42 ends

b. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished or unfinished surfaces. Do not allow coatings to drip, spatter onto or otherwise stain adjacent surfaces.

c. Protect work of other trades against damage from coating operation.

Correct damage by cleaning, repairing, replacing, and recoating, as approved by Stadium Manager, and leave in an undamaged condition.

d. Protect all adjacent surfaces as required by field conditions.

C. REGULATIONS AND STANDARDS

All material and work shall be in accordance with the rules and requirements of the United States Department of Labor Occupational Safety and Health Administration (“OSHA”); National Electrical Code (“NEC”); National Fire Codes published by the National Fire Protection Association (“NFPA”); California Administrative Codes (“CAC”); Uniform Building Code (“UBC”); Uniform Plumbing Code (“UPC”); and other applicable federal, state, and local laws and/or regulations. These specifications shall not be construed to permit work not conforming to these requirements. The regulations shall govern where they require higher standards or conflict with the specifications. Published rulings and interpretations of the enforcing agencies shall be considered a part of these specifications. All regulations and standards shall be the latest publication unless governing authorities require otherwise. In addition, all of Contractor’s work shall be in accordance with the best practices available in the industry, and shall present a neat, workmanlike appearance upon completion.

Page 26 of 42 ends

EXHIBIT “B”

PLANS AND SPECIFICATIONS
Plans and Specifications shall be provided and made a part of each individual Task Order.

Page 27 of 42 ends

EXHIBIT “C”

SPECIAL CONDITIONS

ARTICLE 1. BONDS
Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the Stadium Manager four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the Stadium Manager and included as Exhibit “F” to the Contract. Failure to do so may, in the sole discretion of Stadium Manager, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the Stadium Manager. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

Page 28 of 42 ends

EXHIBIT “D”

CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

BEAR ELECTRICAL SOLUTIONS, LLC

By: _________________________
Signature

_________________________
Name (Print)

_________________________
Title (Print)

---

Page 29 of 42 ends

EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract enter ed into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code Sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
1 Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:
• Contractor shall maintain a current DIR registration for the duration of the project. • Contractor shall include the requirements of Labor Code Sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project. • Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor
Signature
Name and Title
D a t e d

1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

Page 30 of 42 ends

EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

ATTACHED BEHIND THIS PAGE

Page 31 of 42 ends

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter referred to as “Stadium Manager”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by sa id Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the Stadium Manager in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein s pecified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the Indemnified Parties, as stipulated and defined in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by Stadium Manager, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the Stadium Manager from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains.

Nothing herein shall limit the Stadium Manager’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the Stadium Manager to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Stadium Manager’s option:

Page 32 of 42 ends

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the Stadium Manager, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the Stadium Manager to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the Stadium Manager may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the Stadium Manager, when declaring the Contractor in default, notifies Surety of the Stadium Manager’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

Page 33 of 42 ends

(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 34 of 42 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certif icate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

Page 35 of 42 ends

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter designated as the “Stadium Manager”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the Stadium Manager in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SU CH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or

Page 36 of 42 ends

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or Stadium Manager and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

(Corporate Seal) Surety
By
Attorney-in-Fact
T i t l e

Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 37 of 42 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certif icate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

Page 38 of 42 ends

EXHIBIT “G”

RATE SCHEDULE

Year One: April 1, 2026 - March 31, 2027
Straight-
Time
Weekday
Daily OT Saturday Sunday
&
Holiday
Journey Level:

Comm & System Installer

$128.81 $168.74 $180.33 $216.40
Comm & System Tech.

$140.53 $184.09 $196.74 $236.09
Inside Wireman, Technician

$193.46 $253.43 $270.84 $325.01
Cable Splicer

$210.00 $275.10 $294.00 $352.80
Material Handler

$87.93 $115.18 $123.10 $147.72
Material Handler - Fourth Six Months

$78.77 $103.19 $110.28 $132.33
Material Handler - Third Six Months

$72.68 $95.21 $101.75 $122.10
Material Handler - Second Six Months

$63.00 $82.53 $88.20 $105.84
Material Handler - First Six Months

$36.75 $48.14 $51.45 $61.74

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $139.65 $195.51 $195.51 $234.61 Electrician, Inside Wireman - (6th Period) $148.10 $207.34 $207.34 $248.81 Electrician, Inside Wireman - (7th Period) $156.59 $219.23 $219.23 $263.07 Electrician, Inside Wireman - (8th Period) $165.07 $231.10 $231.10 $277.32 Electrician, Inside Wireman - (9th Period) $175.00 $245.00 $245.00 $294.00 Electrician, Inside Wireman - (10th
Period)
$180.00 $252.00 $252.00 $302.40

Materials & Consumables Mark-Up 13%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3%
One Time Start Up Costs
(Applicable to only Year One)

$0.00

Page 39 of 42 ends

Year Two: April 1, 2027 - March 31, 2028
Straight-
Time
Weekday
Daily OT Saturday Sunday
&
Holiday
Journey Level:

Comm & System Installer

$132.67 $173.80 $185.74 $217.58
Comm & System Tech.

$144.74 $189.61 $202.64 $237.38
Inside Wireman, Technician

$199.26 $261.03 $278.97 $326.79
Cable Splicer

$216.30 $283.35 $302.82 $354.73
Material Handler

$90.56 $118.64 $126.79 $148.53
Material Handler - Fourth Six Months

$81.13 $106.28 $113.58 $133.05
Material Handler - Third Six Months

$74.86 $98.06 $104.80 $122.77
Material Handler - Second Six Months

$64.89 $85.01 $90.85 $106.42
Material Handler - First Six Months

$37.85 $49.59 $52.99 $62.08

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $143.84 $188.43 $201.38 $235.90 Electrician, Inside Wireman - (6th Period) $152.54 $199.83 $213.56 $250.17 Electrician, Inside Wireman - (7th Period) $161.29 $211.29 $225.80 $264.51 Electrician, Inside Wireman - (8th Period) $170.02 $222.73 $238.03 $278.84 Electrician, Inside Wireman - (9th Period) $180.25 $236.13 $252.35 $295.61 Electrician, Inside Wireman - (10th
Period)
$185.40 $242.87 $259.56 $304.06

Materials & Consumables Mark-Up 13%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3%

11

Page 40 of 42 ends

Year Three: April 1, 2028 - March 31, 2029
Straight-
Time
Weekday
Daily OT Saturday Sunday
&
Holiday
Journey Level:

Comm & System Installer

$136.65 $179.01 $191.31 $224.11
Comm & System Tech.

$149.08 $195.30 $208.72 $244.50
Inside Wireman, Technician

$205.24 $268.87 $287.34 $336.60
Cable Splicer

$222.79 $291.85 $311.90 $365.37
Material Handler

$93.28 $122.20 $130.59 $152.98
Material Handler - Fourth Six Months

$83.56 $109.47 $116.99 $137.05
Material Handler - Third Six Months

$77.10 $101.00 $107.94 $126.45
Material Handler - Second Six Months

$66.84 $87.56 $93.57 $109.61
Material Handler - First Six Months

$38.99 $51.07 $54.58 $63.94

Apprentice Level:

Electrician, Inside Wireman - (5th Period) $148.15 $194.08 $207.42 $242.97 Electrician, Inside Wireman - (6th Period) $157.12 $205.83 $219.97 $257.68 Electrician, Inside Wireman - (7th Period) $166.13 $217.63 $232.58 $272.45 Electrician, Inside Wireman - (8th Period) $175.12 $229.41 $245.17 $287.20 Electrician, Inside Wireman - (9th Period) $185.66 $243.21 $259.92 $304.48 Electrician, Inside Wireman - (10th
Period)
$190.96 $250.16 $267.35 $313.18

Materials & Consumables Mark-Up 13%
Equipment Rentals Mark-Up 10%
Sub-Contractor Mark-Up 3%

I. Pricing Structure and Requirements

1. Billable Labor Rates
a. The contractor shall be paid at the hourly rate specified above. These rates are fully burdened, including all fringe benefits, profit, and overhead markups.

b. Definitions:
i. Daily Overtime: The rate applied for the first two hours worked beyond the standard 8-hour mark. This rate is applicable only to weekday work and excludes all Saturday, Sunday, and Holiday rates.
ii. Saturday: Fully burdened Saturday overtime hourly rate, inclusive of all fringe benefits.
iii. Sunday & Holiday: Fully burdened Sunday and Holiday overtime hourly rate, inclusive of all fringe benefits

2. Materials and Consumables
a. Materials (which include replacement parts, new components such as panel boards, transformers, etc., but does NOT include the cost of small tools) and consumables, which are “minor” materials actually “consumed” during the course of work (such as 11

Page 41 of 42 ends

caulking, solder, tape, etc.) shall be provided to the Stadium Manager at the Contractor’s “cost” (meaning what the Contractor paid the supplier) plus an agreed upon mark-up percentage, which would include handling, storage, etc. b. When the Contractor is invoicing for specific task orders, and that invoice includes materials costs, Stadium Manager, at its discretion, may require invoices documenting what the Contractor paid for said materials. c. Where an individual repair part, or component, costs in excess of $1,500, the Contractor is required to get quotes from at least two separate suppliers and provide copies of these quotes to Stadium Manager.
d. If Stadium Manager issues an “emergency” task order, this requirement may be waived if Stadium Manager authorizes it.

3. Equipment Rental
a. If the Contractor must rent equipment in order to accomplish a Task Order, the price of that equipment to Stadium Manager shall be the Contractor’s actual invoice cost for that equipment, plus an agreed upon mark-up percentage. b. If the Contractor owns equipment, then reimbursement for use of that equipment is to be covered in the Contractor’s overall Overhead and Profit mark-up, which is a component of the Contractor’s billable hourly rates described above.

4. Permit Fees
a. All permit fees shall be pass through charges billed to the Stadium Manager for actual documented costs charged without markup.

5. Pricing Review Schedule
a. The agreed upon rates and mark-up percentages are firm for the initial three-year term of the agreement, subject only to the prevailing wage adjustment provisions set forth in Bullet C.
b. Contractor may request adjustments to the billable labor rates on each optional one- year options to renew the agreement after the initial term. c. Increases shall not exceed 3% annually, unless applicable prevailing wage rate increases by more than 3%.
d. All price adjustments are subject to Stadium Manager’s written approval. The Contractor must provide documentation that demonstrates to the Stadium Manager's satisfaction a price increase is warranted.

II. Invoicing Requirements
Stadium Manager is using Coupa, a business spends management platform. All purchase orders, invoices, and payments will be handled electronically using the Coupa Supplier Portal. Contractor shall work with Stadium Manager to establish all account information necessary to process payments under this Contract via the Coupa Supplier Portal. ---

Page 42 of 42 ends

EXHIBIT “H”

SAMPLE TASK ORDER FORM

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

TASK ORDER

Task Order No. ______
Contract: [INSERT NAME OF CONTRACT]
Contractor: [INSERT NAME OF CONTRACTOR]
The Contractor is hereby authorized to perform the following work subject to the provisions of the Contract identified above:

List any attachments: [INSERT ATTACHMENTS, IF ANY]
Dollar Amount of Task Order: Not to exceed $_____,_____.00 Liquidated Damages for this Task Order: $XXX per day.

Completion Date: ____________, 20___
The undersigned Contractor hereby agrees that it will provide all equipment, furnish all materials, except as may be otherwise noted above, and perform all work specified above in accordance with the Contract identified above and will accept as full payment therefore the amount shown above.

FORTY NINERS STADIUM

MANAGEMENT COMPANY LLC

[INSERT CONTRACTOR NAME]
D a t e d : Dated:

B y : B y :

-
•
Agreement No: 1xxx
On-Call Electrical Page 1 of 41

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

LEVI’S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR CONTRACT

1. P ARTIES AND DATE.

This Contract is made and entered into this [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***] by and between the Forty Niners Stadium Management Company LLC, a Delaware limited liability company (“Stadium Manager”) and Cupertino Electric, Inc., a Delaware corporation with its principal place of business at 1132 N. Seventh Street, San Jose, CA 95112 (“Contractor”). Stadium Manager and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. R ECITALS.

2.1 Stadium Manager. Stadium Manager seeks to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain maintenance and repair services required by the Stadium Manager on the terms and conditions set forth in this Contract and in the task order(s) to be issued pursuant to this Contract and executed by the Stadium Manager and Contractor (“Task Order”). Contractor represents that it is duly licensed and experienced in providing Levi’s Stadium On-Call Stadium Electrical related maintenance and repair services, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of Stadium Manager. The following license classifications are required for this Project: C-10 Electrical Contractor.

2.3 Project. Stadium Manager desires to engage Contractor to render such services for the On-Call Stadium Electrical Maintenance and Repair (“Project”) as set forth in this Contract on an on-call, as-needed basis. There is no guarantee of any of work under this Contract other than what is specified herein or that the not-to-exceed compensation amount set forth herein will be spent.

2.4 Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, a performance bond, a pa yment bond, and all insurance documentation, as required by the Contract.

3. T ERMS

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
 Scope of Work (Exhibit “A”)
 Plans and Specifications (Exhibit “B”)
 Special Conditions (Exhibit “C”)
 Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”)  Public Works Contractor Registration Certification (Exhibit “E”)  Payment and Performance Bonds (Exhibit “F”)
 Rate Schedule (Exhibit “G”)
 Sample Task Order Form (Exhibit “H”)
1111
- -
Agreement No: 1xxx
On-Call Electrical Page 2 of 41
 Addenda
 Change Orders executed by the Stadium Manager
 2018 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
 Notice Inviting Bids, if any
 Instructions to Bidders, if any
 Contractor’s Bid, if any

3.2 Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the Stadium Manager all labor, materials, tools, equipment, services, and incidental and customary work necessary for the Project (hereinafter sometimes referred to as the “Work”). The type of Work to be provided is described in Exhibit “A” attached hereto and incorporated herein by reference and in the individual Task Orders issued by the Stadium Manager. No Work shall be performed unless authorized by this Contract and by a fully executed Task Order in the form attached hereto as Exhibit “H”. All Work shall be subject to, and performed in accordance, with this Contract, any relevant Task Order, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the Stadium Manager.

Should Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the Stadium Manager may direct the Contractor to proceed with the performance of the change on a time and materials basis.

3.2.2 Substitutions/“Or Equal”. Pursuant to Public Contract Code Section 3400(b), the Stadium Manager may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Spec ifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the Stadium Manager may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the repair schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract.

Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article.

The burden of proof as to the equality of any material, process or article shall rest with Contractor. 1111
Agreement No: 1xxx
On-Call Electrical Page 3 of 41
The Stadium Manager has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted.

Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the Stadium Manager in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the Stadium Manager’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code Section 3400.

3.3 Period of Performance and Liquidated Damages. The term of this Contract shall commence on the date first set forth above and expire on [MONTH DAY, 2029], unless earlier terminated as provided herein. Contractor shall complete the Work within the term of this Contract, and shall meet any other established schedules and deadlines set forth in the Task Order(s). All applicable indemnification provisions of this Contract shall remain in effect following the termination of this Contract. The Parties may, by mutual, written consent, further extend the term of this Contract for two (2) additional one (1) year periods. Pursuant to Government Code Section 53069.85, Contractor shall pay to the Stadium Manager as fixed and liquidated damages a fixed dollar amount per day for each and every calendar day of delay beyond any completion schedule, repair schedule or Project milestones established pursuant to the Contract and any Task Order(s). The daily liquidated damages amount will be determined for each separate Task Order and will be set forth in that Task Order.

3.4 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform t he Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. Contractor shall perform, at its own cost and expense and without reimbursement from the Stadium Manager, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the Stadium Manager to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the Stadium Manager, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship. Stadium Manager retains Contractor on an independent contractor basis and Contractor is not an employee of Stadium Manager. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and 1111
Agreement No: 1xxx
On-Call Electrical Page 4 of 41
control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 Stadium Manager’s Basic Obligation. Stadium Manager agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the Stadium Manager shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below-referenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, Contractor shall receive compensation, including authorized reimbursements, for all Work rendered under this Contract at the rates set forth in Exhibit “G” attached hereto and incorporated herein by reference. The maximum compensation for Work to be provided pursuant to each Task Order shall be set forth in the relevant Task Order. The total compensation to be provided under this Contract by Stadium Manager to Contractor, in the aggregate, shall not exceed Two Hundred Fifty Thousand Dollars ($250,000.00) (“Total Contract Price”) per contract year without the written approval of the Stadium Manager. The term for subsequent fiscal years shall be conditioned upon approval of the Stadium Authority budget for the applicable fiscal year that includes the amounts under this Contract.

3.7.2 Payment of Compensation. Contractor shall submit to Stadium Manager a monthly itemized statement which indicates Work completed by Contractor in a format acceptable to the Stadium Manager. The statement shall describe the amount of Work and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. These statements shall be supported by evidence which is required by this Contract and such other documentation as the Stadium Manager may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated.

3.7.3 Prompt Payment. Stadium Manager shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Deductions and Withholdings. The Stadium Manager may deduct from each progress payment an amount necessary to protect Stadium Manager from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the Stadium Manager in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by Stadium Manager during 1111
Agreement No: 1xxx
On-Call Electrical Page 5 of 41
the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the Stadium Manager, incurred by the Stadium Manager for which Contractor is liable under the Contract; and (11) any other sums which the Stadium Manager is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the Stadium Manager to deduct any of these sums from a progress payment shall not constitute a waiver of the Stadium Manager’s right to such sums.

3.7.5 Substitutions for Contract Deductions and Withholdings. In accordance with California Public Contract Code Section 22300, the Stadium Manager will permit the substitution of securities for any monies withheld by the Stadium Manager to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the Stadium Manager, or with a state or federally chartered bank in California as the escrow agent, and thereafter the Stadium Manager shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the Stadium Manager has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the Stadium Manager.

3.7.6 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the Stadium Manager, or its designee, at the time of payment. To the extent that title has not previously been vested in the Stadium Manager, or its designee, by reason of payments, full title shall pass to the Stadium Manager, or its designee, at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the Stadium Manager or its designee, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.7 Labor and Material Releases. Contractor shall furnish Stadium Manager with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by Stadium Manager.

3.78 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Stadium Manager shall provide Contractor with a copy of t he prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the Indemnified 1111
Agreement No: 1xxx
On-Call Electrical Page 6 of 41
Parties (defined below) free and harmless from any cl aim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.7.9 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said Section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.7.10 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3.7.11 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code Section 1776. In the event of noncompliance with the requirements of this Section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this Section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this Section is on Contractor. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.7.12 Contractor and Subcontractor Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works 1111
Agreement No: 1xxx
On-Call Electrical Page 7 of 41
project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.7.13 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the Stadium Manager. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arisi ng out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.8 Performance of Work; Jobsite Obligations.

3.8.1 Water Quality Management and Compliance, if Applicable.

3.8.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State.

3.8.1.2 Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity wh ich results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires t he SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

3.8.1.3 Other Water Quality Rules Regulations and Policies.

Contractor shall comply with the lawful requirements of any applicable municipality, drainage Stadium Manager, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.
1111
Agreement No: 1xxx
On-Call Electrical Page 8 of 41

3.8.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during repair of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

3.8.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the Indemnified Parties (defined below) for any alleged violations. In addition, Stadium Manager may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit.

3.8.1.6 Reservation of Right to Defend. Stadium Manager reserves the right to defend any enforcement action brought against the Stadium Manager for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy.

Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the Stadium Manager for the costs (including the Stadium Manager’s attorney’s fees) associated with, any settlement reached between the Stadium Manager and the relevant enforcement entity.

3.8.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by Stadium Manager, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under this Contract. Upon request, Stadium Manager will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.8.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations 1111
Agreement No: 1xxx
On-Call Electrical Page 9 of 41
in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the Stadium Manager in writing. Any necessary changes shall be made by written c hange order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the Stadium Manager, Contractor shall be solely responsible for all costs arising therefrom.

Contractor shall defend, indemnify and hold Indemnified Parties (defined below) free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.8.4 Permits and Licenses. Contractor shall be responsible for securing Stadium Manager permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.8.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for Stadium Manager’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify Stadium Manager of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by Stadium Manager; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, Stadium Manager shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.8.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, Stadium Manager shall compensate Contractor for the costs of:
(1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of Stadium Manager to provide for removal or relocation of such utility facilities.

3.8.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements ar e broader, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel-pow ered engine. Contractor shall indemnify the 1111
Agreement No: 1xxx
On-Call Electrical Page 10 of 41
Indemnified Parties (defined below) against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for w hom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.8.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify Stadium Manager in writing and shall furnish all labor and material releases required by this Contra ct. Stadium Manager shall thereupon inspect the Work. If the Work is not acceptable to the Stadium Manager, the Stadium Manager shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the Stadium Manager. Once the Work is acceptable to Stadium Manager, Stadium Manager shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which Stadium Manager may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.10 Claims; Government Code Claim Compliance.

3.10.1 Arbitration. All disputes between Contractor and Stadium Manager relating in any way to this Agreement or Services performed under this Agreement (including, but not limited to, claims for breach of contract, tort, discrimination, harassment and any violation of federal or state law, regulation or constitution) (“Arbitrable Claims”) shall be resolved by binding arbitration under the Federal Arbitration Act, in conformity with the procedures of the California Arbitration Act (Cal. Code Civ. Proc. § 1280 et seq., including § 1283.05 and all of the Act’s other mandatory and permissive rights to discovery). In addition to any other requirements imposed by law, the arbitrator selected shall be a retired California Superior Court Judge, or otherwise qualified individual to whom the parties mutually agree, and shall be subject to disqualification on the same grounds as would apply to a judge of such court. All rules of pleading (including the right of demurrer), all rules of discovery, all rules of evidence, all rights to resolution of the dispute by means of motions for summary judgment, judgment on the pleadings and all other dispositive motions, and judgment under Code of Civil Procedure § 631.8 shall apply and be observed.

Resolution of the dispute shall be based solely upon the law governing the claims and defenses pleaded, and the arbitrator may not invoke any basis other than such controlling law. The arbitrator shall have the immunity of a judicial officer from civil liability when acting in the capacity of an arbitrator, which immunity supplements any other existing immunity. Likewise, all communications during or in connection with the arbitration proceedings are privileged in accordance with Cal. Civil Code § 47(b). As reasonably required to allow full use and benefit of this agreement’s modifications to the Act’s procedures, the arbitrator shall extend the times set by the Act for the giving of notices and setting of hearings. Awards shall include the arbitrator's written reasoned opinion. The Parties understand and agree to this binding arbitration provision, and both Contractor and Stadium Manager give up their right to trial by jury of any claim they may have against each other.

3.11 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by 1111
Agreement No: 1xxx
On-Call Electrical Page 11 of 41
Stadium Manager. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the Stadium Manager may terminate this Contract pursuant to Section 3.17.3; provided, however, that the Stadium Manager needs to provide Contractor with only one (1) day advanced written notice.

3.12 Indemnification.

3.12.1 Scope of Indemnity . To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the Stadium Manager, the Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, empl oyees, agents and authorized volunteers, each tenant and event promoter of Levi’s Stadium, and any mortgagee, bond trustee or other financial institution from time to time holding a line or indenture upon an interest in Levi’s Stadium, and each of them (collectively, the “Indemnified Parties”), free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged negligent acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, s ubcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project, this Contract or any Task Order, including without limitation the payment of all damages, expert witness fees and attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code Section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the Indemnified Parties or the Indemnified Parties’ agents, servants, or independent contractors who are directly responsible to the Indemnified Parties, or for defects in design furnished by those persons.

3.12.2 Additional Indemnity Obligations . Any defense to be provided by Contractor pursuant to any indemnification provision of this Agreement shall be by counsel approved by Stadium Manager, which approval shall not be unreasonably withheld. To the extent any of the Indemnitees incurs costs or expenses to enforce this indemnification (including attorneys' fees and expenses), Contractor shall reimburse the Indemnitee for such costs and expenses.

3.13 Insurance.

3.13.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the Stadium Manager that it has secured all insurance required under this Section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the Stadium Manager that the subcontractor has secured all insurance required under this Section. Failure to provide and maintain all required insurance shall be grounds for the Stadium Manager to terminate this Contract for cause.

3.13.2 Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following levels of coverage:
1111
Agreement No: 1xxx
On-Call Electrical Page 12 of 41

3.13.2.1 Scope of Insurance. Coverage shall be as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); and (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.

3.13.2.2 Limits of Insurance. Contractor shall maintain limits of: (1) General Liability: $2,000,000 per occurrence and $4,000,000 aggregate for bodily injury, personal injury and property damage; (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Defense costs shall be available in addition to the limits.

3.13.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the Stadium Manager to add the following provisions to the insurance policies:

3.13.3.1 General Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 12 19 plus CG20 37 12 19, or endorsements providing the exact same coverage, with respect to the Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying co verage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it.

3.13.3.2 Automobile Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying co verage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.
1111
Agreement No: 1xxx
On-Call Electrical Page 13 of 41

3.13.3.3 Workers’ Compensation and Employer’s Liability Coverage.

The insurer shall agree to waive all rights of subrogation against the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.13.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be materially changed except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the Stadium Manager; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers.

3.13.3.5 Contractor’s Equipment Insurance. Contractors Equipment Insurance applying to loss or damage on an “all risk” basis to any equipment, small tools, or other machinery whether owned, leased, rented, borrowed or otherwise in the care, custody and control of the Contractor for use in the performance of Work. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy.

3.13.4 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the Stadium Manager, its officials, employees, agents and authorized volunteers.

3.13.5 Deductibles and Self-Insurance Retentions. Any deductibles or self- insured retentions relating to Contractor’s coverage is for the sole account of the contractor.

3.13.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VII, licensed to do business in California, and satisfactory to the Stadium Manager. Exception may be made for the State Compensation Insurance Fund when not specifically rated.

3.13.7 Verification of Coverage. Contractor shall furnish Stadium Manager with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the Stadium Manager. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the Stadium Manager. All certificates and endorsements must be received and approved by the Stadium Manager before work commences.

3.13.8 Subcontractors. All subcontractors shall meet the requirements of this Section before commencing Work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the Stadium Manager, its officials, em ployees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the Stadium Manager in writing. 1111
Agreement No: 1xxx
On-Call Electrical Page 14 of 41

3.13.9 Reporting of Claims. Contractor shall report to the Stadium Manager, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

3.14 Bond Requirements.

3.14.1 Payment Bond. If required by law or otherwise specifically requested by Stadium Manager in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concu rrently with this Contract a Payment Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.2 Performance Bond. If specifically requested by Stadium Manager in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concurrently with this Cont ract a Performance Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.3 Bond Provisions. Should, in Stadium Manager’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from Stadium Manager. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the Stadium Manager, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the Stadium Manager. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the Stadium Manager, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the Stadium Manager. If Contractor fails to furnish any required bond, the Stadium Manager may terminate the Contract for cause.

3.14.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the Stadium Manager.

3.15 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the Stadium Manager of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the Stadium Manager in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective 1111
Agreement No: 1xxx
On-Call Electrical Page 15 of 41
Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one-year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the Stadium Manager may require to verify that any corrective actions, including, without lim itation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the Stadium Manager, regardless of whether or not such warranties and guarantees have been transferred or assigned to the Stadium Manager by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the Stadium Manager. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the Stadium Manager, the Stadium Manager shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the Stadium Manager for any expenses incurred hereunder upon demand.

3.16 Employee/Labor Certifications.

3.16.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.16.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not di scriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.16.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.

3.17 General Provisions.

3.17.1 Stadium Manager’s Representative. The Stadium Manager hereby designates the General Manager, or his or her designee, to act as its representative for the performance of this Contract (“Stadium Manager’s Representative”). Stadium Manager’s Representative shall have the power to act on behalf of the Stadium Manager for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the Stadium Manager’s Representative or his or her designee. 1111
Agreement No: 1xxx
On-Call Electrical Page 16 of 41

3.17.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the Stadium Manager (“ ′Contractor’s Representative”).

Following approval by the Stadium Manager, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor’s Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract and as described in the relevant Task Order. Contractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the Stadium Manager, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the Stadium Manager, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s R epresentative, Contractor shall provide the information specified above and obtain the Stadium Manager’s written approval.

3.17.3 Termination. This Contract may be terminated by Stadium Manager at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by Stadium Manager for any reason other than the fault of Contractor, Stadium Manager shall pay Contractor for all Work performed up to that time as provided herein.

In the event of breach of the Contract by Contractor, Stadium Manager may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset Stadium Manager’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, Stadium Manager may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

Further, if this Contract is terminated as provided, Stadium Manager may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract.

3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contra ct or written or oral instructions from Stadium Manager, the matter shall be referred to Stadium Manager’s Representative, whose decision shall be binding upon Contractor.

3.17.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be directed to the regularly- monitored electronic mail address, read receipt requested, of such party as follows:

C
ONTRACTOR:

Attn: [***INSERT CONTRACTOR REP. NAME, TITLE]
[***INSERT CONTRACTOR NAME ***]
[***INSERT EMAIL ADDRESS***]

S
TADIUM MANAGER:

Francine Melendez Hughes, EVP and General Manager
Forty Niners Stadium Management Company LLC
[email protected]

With copy to:
1111
Agreement No: 1xxx
On-Call Electrical Page 17 of 41

Legal Affairs
Forty Niners Stadium Management Company LLC
[email protected]

Any such notice or communication shall be deemed to have been given on the day such notice or communication is sent electronically, provided the sender has received a confirmation of such electronic transmission. A Party may, for purposes of this Agreement, change its email address or the person to whom a notice or other communication is marked to the attention of, by giving notice of such change to the other Party pursuant to this Section 3.17.6.

3.17.7 Time of Essence. Time is of the essence in the performance of this Contract.

3.17.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of Stadium Manager. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, Stadium Manager may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.17.9 No Third-Party Beneficiaries. There are no intended third-party beneficiaries of any right or obligation assumed by the Parties.

3.17.10 Laws, Venue, and Attorneys’ Fees. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of Santa Clara, State of California.

3.17.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.17.13 [Reserved]

3.17.14 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, Stadium Manager shall have the right to terminate this Contract without liability.

3.17.15 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of 1111
Agreement No: 1xxx
On-Call Electrical Page 18 of 41
this warranty, Stadium Manager shall have the right to rescind this Contract without liability. For the term of this Contract, no official, officer or employee of Stadium Manager, during the term of his or her service with Stadium Manager, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the Stadium Manager’s Filing Officer as required under state law in the performance of the Work.

3.17.16 Certification of License.

3.17.16.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.17.16.2 Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.17.17 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.17.18 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.17.19 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.17.20 Stadium Manager’s Right to Employ Other Contractors. Stadium Manager reserves right to employ other contractors in connection with this Project or other projects.

[S
IGNATURES ON NEXT PAGE]

1111
Agreement No: 1xxx
On-Call Electrical Page 19 of 41

SIGNATURE PAGE FOR ON-CALL REPAIR CONTRACT

BETWEEN THE FORTY NINERS STADIUM MANAGEMENT COMPANY LLC AND CUPERTINO ELECTRIC, INC.

IN WITNESS WHEREOF, the Parties have en tered into this Contract as of the [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***].

FORTY NINERS STADIUM CUPERTINO ELECTRIC, INC.

MANAGEMENT COMPANY LLC

B y : B y :

Francine Melendez Hughes
EVP and General Manager Its:

P r i n t e d N a m e :

ATTEST:

B y :
[INSERT NAME]
[INSERT TITLE]

1111
Agreement No: 1xxx
On-Call Electrical Page 20 of 41
EXHIBIT “A”

SCOPE OF WORK
A. SCOPE OF WORK

Troubleshoot, repair, remove, and install electrical equipment and components, typically found in a large sports stadium such as Levi’s Stadium (“Stadium”), rated at less than 60KV.

This work will be performed via issuance of a Task Order (defined elsewhere in this solicitation). The work assigned to Contractor will be designated with one of the following “priority levels” which will indicate the urgency of the work and the Contractor’s response time:

Priority
Level
Type Response Time
1 - High Emergency – Hazardous, property
damage, and/or event required
support
Respond within 1 hour and
commence work as soon as
possible.
2 - Medium Systems Malfunction – Interruption
of daily operation
Respond within 2 hours and
commence work within 24 hours.
3 - Low Minor Repair Respond within 24 hours and
commence work within 72 hours, or
as determined necessary by the
Stadium Manager.

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required.

The Contractor shall maintain all necessary licenses to perform the work specified herein.

The Contractor will be responsible for supplying all necessary equipment (including aerial lifts), tools, consumables, material, labor, and supplies required to perform the work described herein.

Contractor will be tasked, by the Stadium Manager, with performing troubleshooting, repairing, and performing maintenance of various electrical systems at the Stadium, including but not limited to the following:

1. Electrical power work, and communications cabling, including, but not limited, to the following:
a. Power connections for electric-powered equipment;
b. Circuit breaker replacement;
c. Disconnect replacement;
d. Fuse replacement;
e. Conduit repair and installation, including PVC coated rigid conduit and fittings, PVC, flexible conduit, etc.;
f. Wire and electrical cable repair and installation, including copper, aluminum, all insulation, and wire types;
g. Transformer removal and replacement;
1111
Agreement No: 1xxx
On-Call Electrical Page 21 of 41
h. Sub-panel removal and replacement;
i. Electrical devices, including receptacles, switches, etc. Repair, removal, or replacement;
j. Motor, starters, controllers, and variable fr equency drives. Repair, removal, or replacement;
k. Automatic transfer switches;
l. UPS systems and clean power systems, low/medium voltage distribution systems, electrical grounding systems. Troubleshoot and repair; replace batteries as necessary;
m. Troubleshoot and repairs to back-up power systems;
n. Install or repair electric vehicle charging equipment; o. Repairs to computer power floor cables and connections, under carpet raceways, connections to electrified furniture partitions, electrical devices, and trim;
p. Work in electric duct banks; and
q. Fiber optic cable repair, replacement, installation. r. Maintenance repair and installation of low voltage equipment, including cameras, access controls, and A/V systems.

2. Lighting and physical security work, including, but not limited to, the following:
a. Indoor and outdoor lighting repairs and installations, including exterior pole mounted fixtures, and sports field lighting;
b. Cameras and access controls;
c. Lamp removal and replacement, including HID, fluorescent, incandescent, etc.; d. Ballast removal and replacement, including HID, fluorescent, etc.; e. Lighting fixture installation, all types;
f. Lighting control work. Contractors must have experience with a variety of lighting control systems, including Lutron and Crestron control systems; g. Provision of temporary lighting, as necessary; and
h. Conduit and related work for parking lighting, rolling gates, and other related electrical equipment.

3. Testing & Maintenance:
a. Arc Flash assessment;
b. Infrared inspection;
c. Coordination study;
d. Switch gear testing;
e. Emergency generator testing;
f. Power monitoring;
g. Motor control center cleaning; and
h. Ground fault testing.

4. Ancillary Services
a. Any services including, without limitation, other trade work that is incidental and/or supplemental to the performance of the primary services specified above.

B. GENERAL REQUIREMENTS

1. All work performed shall meet the latest revision of all applicable federal, state, and local regulations, laws, and codes.
1111
Agreement No: 1xxx
On-Call Electrical Page 22 of 41

2. All work schedules must be approved in writing by the Stadium Manager prior to commencement of work.

3. Unless otherwise specified, Contractor shall guarantee the labor and materials used are within the specified guidelines and recommendations of the manufacturer.

4. Materials furnished shall be new and shall be of commercial quality material. Used, reconditioned, or discontinued models and materials are not acceptable. The warranty period for contractor provided materials shall be for a period of one (1) year, or within the manufacturer warranty, whichever is longer. Such warranty shall commence upon the date of acceptance of Contractor’s work by the Stadium Manager.

5. The Stadium Manager reserves the right to supply all or part of the materials or equipment on any project/repair.

6. Contractor shall be responsible for the replacement of failed/defective equipment, and parts installed by Contractor that are under warranty. Such cost, if any, shall be incurred by Contractor. Contractor shall assume all liability for such defects.

7. Follow up work required to correct recent repair/improper repair, or substandard parts shall be at no charge to the Stadium Manager.

8. Contractor shall coordinate site access and Hot Work with Forty Niners Stadium Management Company Engineering Department prior to commencement of work.

9. Contractor shall complete a service tag/log after completion of work. Such tag or log must contain the following information:
a. Date of Service
b. Name of Technician(s)
c. Description of Service(s)

10. Contractor shall notify Stadium Manager when a recall is issued for any equipment or component serviced, installed, or repaired by Contractor. Notification by Contractor shall include the reasons for the recall, procedures for replacement, and the disposition of the recalled equipment.

11. Contractor is responsible for compliance with all building code requirements.

Independent of, or in addition, to any other legal requirements, the Stadium Manager may inspect and test Contractor’s work to determine if it conforms to the California Building Standards Code and local regulations, if applicable. The Stadium Manager will not accept Contractor's work unless it meets all applicable building code requirements.

12. The use of the safety equipment includes but is not limited to hard hats, eye protection, safety vests, hearing protection, fall protection, and safety boots as required by the California Occupational Safety and Health Administration.

13. Contractor is required to provide personal protective equipment (PPE) to perform the work and follow the Public Health Orders issued by the Santa Clara County Health 1111
Agreement No: 1xxx
On-Call Electrical Page 23 of 41
Department related to Novel Coronavirus (COVID-19). The Public Health Order updates can be accessed online at
https://www.sccgov.org/sites/covid19/Pages/public-health-orders.aspx

14. Contractor shall maintain all necessary licenses to perform the work specified herein.

15. Contactor shall be in compliance with applicable prevailing wage laws and the California Labor Code.

16. Contractor shall provide protection for all existing building components beneath and around the work. Any damage to existing building components caused by contractor shall be immediately repaired or replaced at contractor’s sole expense in a manner acceptable to and approved by Stadium Manager.

17. In all active work areas, contractor shall provide, install, and maintain all necessary barricades and warnings to prohibit pedestrian access into any affected work area.

This not only includes areas surrounding the work, but also includes areas below the work. Levi’s Stadium is an active building containing employees, guests, and other contractors on a daily basis. Contractor shall be responsible for keeping others out of its active work areas and preventing the exposure of others to grinding, sanding, scraping, paint drips, overspray, or any other material generated within the work area, both around and below.

18. Contractor will have a designated representative to oversee Contractor’s technicians assigned to perform the work specified herein. Contractor representative shall be responsible for providing all required documents, including, but not limited to, reports, invoices, as-built drawings, and all other project contract documents to the Stadium Manager.

19. Contractor shall assign a primary/secondary technician(s) as the main contact for the Stadium Manager during the term of the contract. If different representatives are designated during the term of the Contract, notice of any changes (including, but not limited to, name, address, e-mail, and telephone number) shall be promptly served in writing.

20. Contractor must obtain written authorization prior to commencement of work. The Stadium Manager will provide Contractor written approval by issuing a Notice to Proceed.

21. The Contractor shall perform the following to ensure a clean, safe work site:

a. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from project site. Secure, locate, and position all unused materials and equipment, including man lifts, to the satisfaction of Stadium Manager.

b. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished or unfinished surfaces. Do not allow coatings to drip, spatter onto or otherwise stain adjacent surfaces. 1111
Agreement No: 1xxx
On-Call Electrical Page 24 of 41

c. Protect work of other trades against damage from coating operation.

Correct damage by cleaning, repairing, replacing, and recoating, as approved by Stadium Manager, and leave in an undamaged condition.

d. Protect all adjacent surfaces as required by field conditions.

C. REGULATIONS AND STANDARDS

All material and work shall be in accordance with the rules and requirements of the United States Department of Labor Occupational Safety and Health Administration (“OSHA”); National Electrical Code (“NEC”); National Fire Codes published by the National Fire Protection Association (“NFPA”); California Administrative Codes (“CAC”); Uniform Building Code (“UBC”); Uniform Plumbing Code (“UPC”); and other applicable federal, state, and local laws and/or regulations. These specifications shall not be construed to permit work not conforming to these requirements. The regulations shall govern where they require higher standards or conflict with the specifications. Published rulings and interpretations of the enforcing agencies shall be considered a part of these specifications. All regulations and standards shall be the latest publication unless governing authorities require otherwise. In addition, all of Contractor’s work shall be in accordance with the best practices available in the industry, and shall present a neat, workmanlike appearance upon completion.

1111
Agreement No: 1xxx

Page 25 of 41 ends

EXHIBIT “B”

PLANS AND SPECIFICATIONS
Plans and Specifications shall be provided and made a part of each individual Task Order.

1111
Agreement No: 1xxx

Page 26 of 41 ends

EXHIBIT “C”

SPECIAL CONDITIONS

ARTICLE 1. BONDS
Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the Stadium Manager four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the Stadium Manager and included as Exhibit “F” to the Contract. Failure to do so may, in the sole discretion of Stadium Manager, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the Stadium Manager. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

1111
Agreement No: 1xxx

Page 27 of 41 ends

EXHIBIT “D”

CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

[***INSERT CONTRACTOR NAME***]

By: _________________________
Signature

_________________________
Name (Print)

_________________________
Title (Print)

1111
Agreement No: 1xxx

Page 28 of 41 ends

EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract enter ed into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code Sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
1 Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:
 Contractor shall maintain a current DIR registration for the duration of the project.  Contractor shall include the requirements of Labor Code Sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.  Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor
Signature
Name and Title
D a t e d

1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” 1111
Agreement No: 1xxx

Page 29 of 41 ends

EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

ATTACHED BEHIND THIS PAGE

1111
Agreement No: 1xxx

Page 30 of 41 ends

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter referred to as “Stadium Manager”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by sa id Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the Stadium Manager in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein s pecified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the Indemnified Parties, as stipulated and defined in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by Stadium Manager, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the Stadium Manager from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains.

Nothing herein shall limit the Stadium Manager’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the Stadium Manager to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Stadium Manager’s option:
1111
Agreement No: 1xxx

Page 31 of 41 ends

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the Stadium Manager, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the Stadium Manager to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the Stadium Manager may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the Stadium Manager, when declaring the Contractor in default, notifies Surety of the Stadium Manager’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

1111
Agreement No: 1xxx

Page 32 of 41 ends

(Corporate Seal) Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

1111
Agreement No: 1xxx

Page 33 of 41 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

1111
Agreement No: 1xxx

Page 34 of 41 ends

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter designated as the “Stadium Manager”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the Stadium Manager in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SU CH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or 1111
Agreement No: 1xxx

Page 35 of 41 ends

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or Stadium Manager and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
B y

T i t l e

(Corporate Seal) Surety
By
Attorney-in-Fact
T i t l e

Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

1111
Agreement No: 1xxx

Page 36 of 41 ends

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of t he individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _____________________ __________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual
 Corporate Officer
Title(s) Title or Type of Document
 Partner(s)  Limited
 General Number of Pages
 Attorney-In-Fact
 Trustee(s)
 Guardian/Conservator Date of Document
 Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

r7
Agreement No: 1xxx

Page 37 of 41 ends

EXHIBIT “G”

RATE SCHEDULE

Rate Period
Straight-
Time
Weekday Dail y Saturda y
Sunday &
Holiday
Journeyman Level:

COMM & SYSTEM 12/1/2025 - 11/30/2026 $118.05 $156.16 $156.16 $194.93 INSTALLER 12/1/2026 - 11/30/2027 $124.86 $168.69 $168.69 $213.22 12/1/2027 - 3/31/2028 $128.61 $171.05 $171.05 $213.49
4/1/2028 - 3/31/2029 $132.47 $176.18 $176.18 $219.89

COMM & SYSTEM TECH. 12/1/2025 - 11/30/2026 $135.00 $178.84 $178.84 $223.40 12/1/2026 - 11/30/2027 $143.59 $193.98 $193.98 $245.19
12/1/2027 - 3/31/2028 $147.90 $196.70 $196.70 $245.51
4/1/2028 - 3/31/2029 $152.34 $202.61 $202.61 $252.88

INSIDE WIREMAN,
TECHNICIAN 6/1/2025 - 5/ 31/2026 $180.32 $236.76 $291.95 $291.95 6/1/2026- 5/31/2027 $186.17 $245.82 $304.65 $304.65
6/1/2027- 3/31/2028 $191.76 $255.03 $318.31 $318.31
4/1/2028 - 3/31/2029 $197.51 $262.69 $327.86 $327.86

CABLE SPLICER 6/1/2025 - 5/31/2026 $203.49 $267.21 $330.68 $330.68 6/1/2026- 5/31/2027 $205.74 $273.38 $341.04 $341.04
6/1/2027- 3/31/2028 $211.91 $281.84 $351.77 $351.77
4/1/2028 - 3/31/2029 $218.27 $290.30 $362.33 $362.33

MATERIAL HANDLER 8/1/2021 - 7/31/2026 $82.93 $112.03 $140.63 $140.63 8/1/2026 - 7/31/2027 $90.36 $121.71 $144.58 $150.00
8/1/2027- 3/31/2028 $93.07 $123.78 $148.91 $154.50
4/1/2028 - 3/31/2029 $95.86 $127.50 $153.38 $159.13

MATERIAL HANDLER - 8/1/2021 - 7/31/2026 $70.48 $104.17 $130.77 $130.77 FOURTH SIX MONTHS 8/1/2026 - 7/31/2027 $83.00 $114.38 $132.80 $137.78 6/1/2027- 3/31/2028 $85.49 $117.19 $140.99 $146.27
4/1/2028 - 3/31/2029 $88.05 $120.71 $145.22 $150.66

MATERIAL HANDLER - 8/1/2021 - 7/31/2026 $62.20 $91.92 $115.39 $115.39 THIRD SIX MONTHS 8/1/2026 - 7/31/2027 $72.68 $100.30 $116.29 $120.65 6/1/2027- 3/31/2028 $74.86 $103.84 $124.92 $129.60
4/1/2028 - 3/31/2029 $77.11 $106.95 $128.67 $133.49

MATERIAL HANDLER - 8/1/2021 - 7/31/2026 $53.90 $79.66 $100.00 $100.00 SECOND SIX MONTHS 8/1/2026 - 7/ 31/2027 $65.50 $91.33 $104.80 $108.73 6/1/2027- 3/31/2028 $67.47 $95.48 $114.87 $119.17
4/1/2028 - 3/31/2029 $69.49 $98.35 $118.31 $122.75
1111
Agreement No: 1xxx

Page 38 of 41 ends

Rate Period
Straight-
Time
Weekday Dail y Saturda y
Sunday &
Holiday

MATERIAL HANDLER - 8/1/2021 - 7/ 31/2026 $49.75 $73.63 $92.31 $92.31 FIRST SIX MONTHS 8/1/2026 - 7/31/ 2027 $37.41 $54.72 $59.86 $62.10 6/1/2027- 3/31/2028 $38.53 $51.25 $61.65 $63.96
4/1/2028 - 3/31/2029 $39.69 $52.79 $63.50 $65.88
Apprentice Level:

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $126.95 $164.93 $202.19 $202.19 (5th period) 6/1/2026- 5/31/2027 $129.94 $170.44 $209.67 $209.67 6/1/2027- 3/31/2028 $133.84 $178.00 $214.14 $214.14
4/1/2028 - 3/31/2029 $137.86 $183.34 $220.57 $220.57

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $134.64 $175.55 $215.11 $215.11 (6th period) 6/1/2026- 5/31/2027 $138.07 $181.67 $223.31 $223.31 6/1/2027- 3/31/2028 $142.21 $189.14 $227.54 $227.54
4/1/2028 - 3/31/2029 $146.48 $194.82 $234.37 $234.37

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $142.35 $186.19 $228.00 $228.00 (7th period) 6/1/2026- 5/31/2027 $146.18 $192.84 $236.96 $236.96 6/1/2027- 3/31/2028 $150.57 $200.25 $240.90 $240.90
4/1/2028 - 3/31/2029 $155.09 $206.26 $248.13 $248.13

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $150.06 $196.75 $240.91 $240.91 (8th period) 6/1/2026- 5/31/2027 $154.30 $203.56 $250.62 $250.62 6/1/2027- 3/31/2028 $158.93 $211.38 $254.29 $254.29
4/1/2028 - 3/31/2029 $163.70 $217.72 $261.91 $261.91

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $157.79 $206.91 $253.83 $253.83 (9th period) 6/1/2026- 5/31/2027 $162.43 $214.28 $264.29 $264.29 6/1/2027- 3/31/2028 $167.30 $222.51 $267.68 $267.68
4/1/2028 - 3/31/2029 $172.32 $229.19 $275.72 $275.72

ELECTRICIAN, INSIDE
WIREMAN - 6/1/2025 - 5/ 31/2026 $165.49 $217.05 $266.71 $266.71 (10th period) 6/1/2026- 5/31/2027 $170.53 $225.00 $277.94 $277.94 6/1/2027- 3/31/2028 $175.65 $233.61 $281.03 $281.03
4/1/2028 - 3/31/2029 $180.92 $240.62 $289.46 $289.46

Rate Period: 4/1/26-3/31/29
Materials & Consumables Mark-Up 12%
Equipment Rentals Mark-Up 10%
7 Agreement No: 1xxx

Page 39 of 41 ends

Sub-Contractor Mark-Up 9%
One Time Start Up Costs
(Applicable to only Year One)

$0.00

I. Pricing Structure and Requirements

1. Billable Labor Rates
a. Contractor shall be paid at the hourly rate specified above. The specified hourly rates above shall include the fully burdened hourly rate, inclusive of all fringe benefits, and overhead and profit.
b. Definitions:
i. Daily Overtime: The rate applied for the first two hours worked beyond the standard 8-hour mark. This rate is applicable only to weekday work and excludes all Saturday, Sunday, and Holiday rates.
ii. Saturday: Fully burdened Saturday overtime hourly rate, inclusive of all fringe benefits.
iii. Sunday & Holiday: Fully burdened Sunday and Holiday overtime hourly rate, inclusive of all fringe benefits

2. Materials and Consumables
a. Materials (which include replacement parts, new components such as panel boards, transformers, etc., but does NOT include the cost of small tools) and consumables, which are “minor” materials actually “consumed” during the course of work (such as caulking, solder, tape, etc.) shall be provided to the Stadium Manager at the Contractor’s “cost” (meaning what the Contractor paid the supplier) plus an agreed upon mark-up percentage, which would include handling, storage, etc. b. When the Contractor is invoicing for specific task orders, and that invoice includes materials costs, Stadium Manager, at its discretion, may require invoices documenting what the Contractor paid for said materials. c. Where an individual repair part, or component, costs in excess of $1,500, the Contractor is required to get quotes from at least two separate suppliers and provide copies of these quotes to Stadium Manager.
d. If Stadium Manager issues an “emergency” task order, this requirement may be waived if Stadium Manager authorizes it.

3. Equipment Rental
a. If the Contractor must rent equipment in order to accomplish a Task Order, the price of that equipment to Stadium Manager shall be the Contractor’s actual invoice cost for that equipment, plus an agreed upon mark-up percentage. b. If the Contractor owns equipment, then reimbursement for use of that equipment is to be covered in the Contractor’s overall Overhead and Profit mark-up, which is a component of the Contractor’s billable hourly rates described above.

4. Permit Fees
a. All permit fees shall be pass through charges billed to the Stadium Manager for actual documented costs charged without markup.
11 1111
Agreement No: 1xxx

Page 40 of 41 ends

5. Pricing Review Schedule
a. The agreed upon rates and mark-up percentages are firm for the initial three-year term of the agreement, subject only to the prevailing wage adjustment provisions set forth in Bullet C.
b. Contractor may request adjustments to the billable labor rates on each optional one- year options to renew the agreement after the initial term. c. Increases shall not exceed 3% annually, unless applicable prevailing wage rate increases by more than 3%.
d. All price adjustments are subject to Stadium Manager’s written approval. The Contractor must provide documentation that demonstrates to the Stadium Manager's satisfaction a price increase is warranted.

II. Invoicing Requirements
Stadium Manager is using Coupa, a business spends management platform. All purchase orders, invoices, and payments will be handled electronically using the Coupa Supplier Portal. Contractor shall work with Stadium Manager to establish all account information necessary to process payments under this Contract via the Coupa Supplier Portal.

1111
Agreement No: 1xxx

Page 41 of 41 ends

EXHIBIT “H”

SAMPLE TASK ORDER FORM

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

TASK ORDER

Task Order No. ______
Contract: [INSERT NAME OF CONTRACT]
Contractor: [INSERT NAME OF CONTRACTOR]
The Contractor is hereby authorized to perform the following work subject to the provisions of the Contract identified above:

List any attachments: [INSERT ATTACHMENTS, IF ANY]
Dollar Amount of Task Order: Not to exceed $_____,_____.00 Liquidated Damages for this Task Order: $XXX per day.

Completion Date: ____________, 20___
The undersigned Contractor hereby agrees that it will provide all equipment, furnish all materials, except as may be otherwise noted above, and perform all work specified above in accordance with the Contract identified above and will accept as full payment therefore the amount shown above.

FORTY NINERS STADIUM

MANAGEMENT COMPANY LLC

[INSERT CONTRACTOR NAME]
D a t e d : Dated:

B y : B y :

1111
-
•

Date: April 2, 2026

To: Jovan Grogan
Executive Director
Santa Clara Stadium Authority

From: Procurement Department
Forty Niners Stadium Management Company LLC

Subject: Recommendation for Award RFP-FY25-0085 for Levi’s Stadium On- Call Electrical Maintenance and Repair Services

Recommendation:

1. Approve and authorize the Stadium Manager to enter into agreements with ASF Electric, Inc., Bear Electrical Solutions, LLC, and Cupertino Electric, Inc., (collectively, the “Agreements”) to provide on-call electrical maintenance and repair services at Levi’s Stadium for an initial term of three (3) years commencing April 1, 2026, and expiring March 31, 2029, with two (2) optional one-year extensions through March 31, 2031. The total aggregate amount payable under all agreements shall not exceed $250,000 per contract year, $750,000 over the initial three-year period, and $1,250,000 over the maximum five (5) year term unless modified pursuant to Recommendation 3 below. The term for each fiscal year is contingent on the Santa Clara Stadium Authority (SCSA) approving the applicable fiscal year's budget, including amounts due under the Agreements.

2. Approve a contingency in the amount of one hundred twenty-five thousand dollars ($125,000), which is equal to ten percent (10%) of the aggregate total not-to-exceed value of the baseline amount payable under all Agreements over the maximum five (5) year term of the Agreements (i.e., $250,000 per year x 5 years). The contingency may be used to increase the not-to-exceed amount of any Agreement during any contract year, as needed to cover unforeseen services, subject to budget appropriations.

3. Authorize the Stadium Authority Executive Director to approve future amendments as needed to: (a) exercise the option to extend the Agreements by two (2) one-year extension periods through March 31, 2031, and to establish the not-to-exceed amount for each extension period of $250,000 to cover services during each extension; (b) increase the rates in contract years two through five (April 1, 2027 - March 31, 2031) by up to five percent (5%) over the previous year’s rates in accordance with the terms and conditions associated with rate increases in Exhibit G of the Agreements; (c) increase the not-to-exceed amount payable under each Agreement for contract years two through five (April 1, 2027- March 31, 2031), by up to five percent (5%) over the previous year's amount to account for rate increases, subject to budget appropriations; and (c) increase the not-to-exceed amount of any Agreement during any contract year using contingency funds as needed to cover unforeseen services, subject to budget appropriations. The

STADIUM

FORTY NINERS STADIUM MANAGEMENT COMPANY

aggregate total not-to-exceed value of amounts payable under all Agreements over the five (5) year term, inclusive of all contract years and contingency, shall not exceed $1,506,408 – see Table 1 below for details.

4. Authorize the Stadium Manager to issue and execute task orders to the three contracting firms, up to the aggregate not-to-exceed amount for each contract year, subject to budget appropriations.

Reasons for Recommendation
Forty Niners Stadium Management Company LLC (Stadium Manager) is responsible for continuous year-round management, operations, and maintenance of the 1.85 million square foot Stadium. Given the facility’s size and complex electrical components, the Stadium Manager determined it is necessary to establish a bench of qualified, experienced providers to provide electrical and repair services on an on-call, “as needed” basis, ensuring required management services are met.

There are several reasons to enter into contracts with three on-call electrical providers. First, having multiple providers under contract allows the Stadium Manager to seek competitive quotes from each provider when needed, thereby ensuring we receive the most competitive pricing for each service. Second, having multiple on-call electrical providers under contract enables us to select the provider whose expertise and strengths align with the specific repairs or specialty required for our complex facility. Third, our experience has shown that having more than two on-call providers is the best practice, allowing us to quickly address all repairs, including unexpected emergencies, thereby minimizing facility downtime. Having three on-call providers reduces the likelihood of scheduling delays or delays in urgent repairs due to provider scheduling.

To provide a consistent and safe operating environment for daily usage and events, these services include repairing power connections for equipment, replacing circuit breakers, troubleshooting electrical malfunctions, and testing and repairing various electrical systems.

Stadium Manager has regularly used on-call electrical vendors for electrical repairs, and we anticipate a continued need, as Levi’s Stadium is a complex, aging facility. Stadium Manager previously contracted with two on-call electrical vendors under a three-year agreement beginning May 5, 2021, and ending May 4, 2024, with an option to extend the term for two additional one- year periods. Total expenses for the first three-year term were $587,844.96, and total expenses for the five-year term through March 2026 is $642,535.32.

RFP Process:

On August 11, 2025, Stadium Manager issued a Request for Proposals (RFP) to select multiple qualified firms to provide on-call electrical maintenance and repair services at Levi’s Stadium.

Stadium Manager published the RFP on Bonfire Interactive, Stadium Manager’s eProcurement portal https://49ers.bonfirehub.com/portal/. In addition to inviting firms from our established supplier list, Stadium Manager also invited suppliers registered on the portal with specific commodity codes that offer these services. On August 26, 2025, Stadium Manager conducted a non-mandatory Pre-Proposal Conference and site visit at the Stadium. Stadium Manager 4900 Marie P. DeBartolo Way I Santa Clara, CA 95054

conducted a comprehensive site visit and provided clarifications to questions from proposers. On September 5, 2025, Addendum #1 to the RFP was issued, providing answers to questions from proposers. The RFP closed on September 18, 2025, at 3:00 p.m. (PT).

Six proposals were received from the following firms on or before the RFP due date and time.

1. ASF Electric, Inc. (ASF)

2. Bear Electrical Solutions, LLC (Bear)

3. Cupertino Electric, Inc. (CEI)

4. JJG Services Inc., DBA Corinthian Electric (Corinthian)

5. Sprig Electric Co. (Sprig)

6. Telstar Instruments (Telstar)

Evaluation Process:

An evaluation committee (EC) consisting of subject matter experts from Stadium Manager was formed. An Evaluator’s Guide outlining the roles and responsibilities of the EC was provided to each EC member. Each EC member executed the following forms:
• Proposal Evaluator Guidelines
• Confidentiality Agreement
• Conflict of Interest Disclosure Form

The EC evaluated the proposals utilizing the evaluation criteria as outlined in the RFP.

Corinthian was deemed non-responsive and therefore eliminated from the review process. Five other firms met the basic requirements of the RFP submissions.

Consensus scores were utilized to compute an “average score,” summarized below:

Evaluation Criteria ASF Bear CEI Sprig Telstar
Proposal Responsiveness Pass Pass Pass Pass Pass
Project Team Qualifications and
Experience (35 Points) 29.33 31.33 33.00 32.67 27.33
Qualifications: Technical Capability,
License, and Other Qualifications
(35 Points) 30.17 32.00 32.83 33.00 27.83
Cost (30 Points) 30.00 22.20 28.53 26.92 15.76
Total 89.50 85.53 94.36 92.59 70.93

ASF Electric, Inc., Bear Electrical Solutions, LLC, Cupertino Electric, Inc., and Sprig Electric Co., (each, a “Vendor,” and collectively, the “Vendors”) were all determined to be within the competitive range, and each satisfied the requirements set forth in the RFP.

Stadium Manager negotiated various rates and costs, as applicable, with each Vendor based on their specific cost proposals. This process included securing competitive billable labor rates, as well as percentage markups for materials, equipment rentals, and subcontractors, and Vendor start-up costs. Stadium Manager was able to successfully negotiate these rates with ASF Electric, 4900 Marie P. DeBartolo Way I Santa Clara, CA 95054

Inc., Bear Electrical Solutions, LLC, and Cupertino Electric, Inc. All business, legal, and cost discussions were completed in accordance with Section 15 of the RFP.

Notice of Intended Award:

A notice of intended award (NOIA) was issued on April 1, 2026, announcing Stadium Manager’s recommended Vendors. The RFP process includes a ten-day protest period, which commenced with the issuance of the NOIA. This recommendation is submitted concurrently to facilitate the lead time required to submit our recommendation to the Santa Clara Stadium Authority (SCSA) Board. In the event of a protest, the recommendation will be withdrawn, and the protest addressed.

Submission of Post-Award Submittals:

Once Stadium Manager receives approval from the SCSA Board, the agreements will be executed by all parties, and a copy will be forwarded to the SCSA. Supporting documentation has been provided for review and approval.

The Vendors require the commencement date of the contract in order to obtain the payment bond. Once Stadium Manager receives approval from the Stadium Authority Board, a firm contract commencement date will be finalized, at which time, each vendor will provide the requisite payment bond.

Fiscal Impact:

The cost for the on-call electrical maintenance and repair services is covered in the proposed FY26/27 SCSA Budget, Engineering Department budget, as a shared expense. As a shared expense, the Stadium Authority is responsible for fifty percent (50%) of the cost of the service.

Although the Agreements will be executed with three vendors, the annual not-to-exceed compensation of $250,000 will be calculated on an aggregate basis (not per vendor) each year.

Language in the Agreements allows contractors to negotiate rate increases for contract years four and five (April 1, 2029-March 31, 2031). Many of the labor positions covered by these agreements are unionized and subject to collective bargaining agreements that include built-in wage and fringe benefit escalation provisions set by the Department of Industrial Relations.

To address this, and to ensure consistent service levels across all contract years, a delegation of authority is requested, authorizing the Executive Director to approve contract amendments to adjust the rates for contract years two through five, and to increase the not-to-exceed amounts of the Agreements for contract years two through five by up to five percent (5%) over the prior year’s amounts. Any increase remains subject to available Stadium Authority budget appropriations.

Additionally, a contingency of up to $125,000, equal to ten percent (10%) of the aggregate total not-to-exceed value of the baseline amounts payable under all Agreements over the maximum five (5) year term of the Agreements (i.e., $250,000 per year x 5 years) is requested and may be used as necessary in any contract year to promptly address costs, ensuring business continuity and completion of needed mechanical and plumbing maintenance and repair services at Levi’s 4900 Marie P. DeBartolo Way I Santa Clara, CA 95054

Stadium without disruption. Use of contingency funds is subject to Executive Director approval and appropriation of funds.

These Agreements do not guarantee any minimum amount of work for any Vendor. All services will be performed as needed through task orders issued by the Stadium Manager and within the approved budget.

The chart below summarizes the projected costs over the five-year term of the Agreements, assuming a five percent (5%) rate increase for contract years 2 through 5.

Table 1 Cost Summary
Description “Combined” NTE
Year 1 (4/1/26-3/31/27) $250,000
Year 2 (4/1/27-3/31/28) + 5% increase $262,500
Year 3 (4/1/28-3/31/29) + 5% increase $275,625
Year 4 (4/1/29-3/31/30) + 5% increase $289,406
Year 5 (4/1/30-3/31/31) + 5% increase $303,877
Contingency $125,000
Total Not-to-Exceed Maximum Compensation $1,506,408

4900 Marie P. DeBartolo Way I Santa Clara, CA 95054
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
26-784 Agenda Date: 7/14/2026

REPORT TO COUNCIL

SUBJECT
Action on a Resolution (1) Calling and Giving Notice of a Special Municipal Election to be Held on November 3, 2026 in Conjunction with the City’s General Municipal Election for a Vote on Two Ballot Measures that, if Passed, Would Amend the City Charter as Follows: (a) Implement a Comprehensive Update of the City Charter; and (b) Update the City’s Public Works Procurement; (2) Requesting the Consolidation of Such Election with the Statewide General Election to be Held in Santa Clara County on November 3, 2026; (3) Directing the Office of the City Attorney to Prepare the Impartial Analyses for the Two Measures; and (4) Setting the Priorities and Schedule for Ballot Arguments; and Authorizing Other Necessary and Appropriate Actions

BACKGROUND
Charter Project Origins and Purpose
Upon a recommendation from professional staff, the idea for a comprehensive review and update of the City Charter (now commonly referred to as the “Charter Project”) was incorporated into the Governance and Ethics Committee Work Plan in early 2025. Staff’s recommendation was based upon their professional assessment, along with feedback from the different departments responsible for implementing the Charter’s terms, that a number of Charter provisions were ambiguous, out of date, not aligned with current City operations or best practices, and/or not aligned with current laws.

With support from the Committee, the project concept was presented to the full City Council on July 15, 2025. Recognizing the potential benefits of the project, the Council directed staff to take the initial steps to form a Charter Review Committee for purposes of implementing the “Charter Project” (the Charter Project CRC). Council direction included terms for the CRC’s composition, selection process and purposes. Staff advertised the availability of CRC positions and, with the City Clerk, implemented the CRC lottery selection and appointment process. On September 16, 2025, the City Council appointed the CRC members and formally established the CRC by adoption of the CRC Bylaws.

Section 2 of the City Council adopted Bylaws for the Charter Project CRC describes its purpose as follows:
“The purpose of the CRC is to work with City staff, with input from the community, to facilitate the implementation of the “Charter Project.” The Charter Project involves a process for comprehensive review of the City Charter to identify provisions in the Charter that should be corrected, clarified or modified for the Charter to be fully consistent with applicable state law, aligned with current best practices for City operations and, in general, easier to understand and apply. At the end of the process, the objective of the Charter Project is to produce a draft comprehensive Charter Amendment for presentation to the City Council and, if the City Council so directs, possibly the voters at the November 2026 Election.” City of Santa Clara Printed on 7/10/2026Page 1 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
Section 3 of the Bylaws sets forth a list of the CRC’s duties. An excerpt from Section 3.4 provides further detail on the project’s focus and describes the CRC’s ultimate duty as follows:
“The proposed “top to bottom” review process is intended to be driven by practical and legal considerations, with the prime objective being to bring the Charter up to current “best practices” for City operations. It is not intended to implement any major restructuring of City operations or to change the City’s election process. In the end, it will be up to the Charter Review Committee to recommend, and the City Council to decide which, if any, of the proposed changes will be presented to the voters as part a comprehensive update to the City Charter.”
CRC Project Implementation
To implement the Charter Project, over a nine month period starting in October of 2025, the CRC met in public (10 times), and in Ad Hoc Subcommittee working groups (28 times) to (1) hear from stakeholders regarding proposed Charter changes, (2) discuss and resolve issues regarding what changes made sense as part of the project versus what issues might better be implemented by Council policy or a future Charter update, (3) review proposed language prepared by the City Attorney’s Office to implement approved changes, and (4) ultimately, develop a formal recommendation for Council consideration. On April 7, 2026, the CRC also checked in with the City Council with a progress report. That report included a presentation of the CRC’s proposed comprehensive reorganization of the Charter to make it more user-friendly.

After a series of meetings in May, the full CRC met again on June 3rd. At the June 3rd meeting, the CRC considered all of its previous actions, made a few minor modifications to the proposed language, and approved (unanimously) the CRC’s Charter update recommendation. At that meeting, City staff also presented on the status of the CRC’s pending final written report (“CRC Final Report”).

As outlined and approved by CRC consensus at their May 27th meeting, the CRC Final Report was designed to summarize the Charter Project implementation process, from its origins, through its meeting-by-meeting development, to its final results and recommendation. At its June 3rd meeting, the CRC also formed a five-person CRC Presentation Ad Hoc Subcommittee to assist staff with the finalization and presentation to Council of the CRC Final Report.

CRC Final Report and Recommendation
The CRC Final Report contains the following information:

1. Charter Project Origins and Objectives. A description of the origins and objectives of the Charter Project.

2. The Process. A summary of the process and approach used to implement the Charter Project.

This includes details on: (a) the creation and function of the six CRC Ad Hoc Subcommittee “working groups;” (b) the solicitation and provision of stakeholder input; (c) benchmarking with other “comparable” charters and charter update projects; and (d) the categorization of proposed changes into “levels.”

3. The Results. A summary of the proposed changes resulting from this process. Changes City of Santa Clara Printed on 7/10/2026Page 2 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
presented include Charter-wide updates and conventions, along with the Article by Article, Section by Section changes, ranging from mere corrections, wording updates and reorganization (“Level One”), changes to clarify ambiguities, deletion of no longer needed provisions, added language to fill gaps or align Charter language with current City/best practices (“Level Two”), all the way to changes that are recommended, but may be so substantive or in such sensitive areas, they might be better presented as stand-alone ballot measures or left out entirely (“Level Three”).

4. The Final Recommendation. The CRC’s final recommendation on what the City Council should consider placing on the November 2026 ballot. In summary, the CRC’s recommendation was for City Council to:
a. Proceed with the Comprehensive Update for Consideration by Voters at the November 2026 Election.
b. Include all Level One and Level Two Changes, and such Level Three Changes Council feels confident will be supported by the community.
c. Provide for a public information program to include (1) annotated “clean” and underline/strikeout versions of the updated Charter, and FAQs on the City’s website; (2) information mailers to be distributed to voters (similar to Measure I); and (3) public forums (with CRC support) to share information and respond to questions/concerns.

5. Next Steps. Steps required if the Council decides to place a measure on the ballot, including things that could be done to help inform voters and, if the measure(s) were to pass, actions that would need to be taken to implement the approved Charter amendments.

City Council June 9th Study Session
At the City Council’s June 9th meeting, the CRC Final Report was distributed to Council, and the City Attorney presented on the project in a study session format. Members of the CRC Presentation Ad Hoc Subcommittee attended this meeting and were on standby to answer Council questions. The materials provided along with the Final Report included:

1. Charter Review Committee Bylaws

2. The City Charter-Current

3. An Assembled History of Previously Proposed and Approved Charter Amendments (1952 through 2024)

4. City Charter with Proposed Modifications-Underline/Strikeout Version with Annotations

5. City Charter with Proposed Modifications-Clean Version (Changes Accepted) with Annotations

6. Charter Review Committee Charter Project 2026 Final Report to Council (CRC Final Report) · To facilitate the City Council’s review and understanding of the CRC’s proposed substantial update, it was noted that the updated Charter documents presented contain (and in the underline/strikeout version, highlight) every proposed CRC modification. They also contain, throughout, annotations in the margins. These annotations include references to primary City of Santa Clara Printed on 7/10/2026Page 3 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
source materials, applicable laws, and the stakeholder input considered by the CRC in proposing these changes. For the more substantive proposed changes, or proposed changes in politically sensitive areas, many annotations also include summaries of the CRC’s thought process that went into the development and ultimate recommendation for each proposed modification. Where any proposed CRC modification rose to Level 3, this is also noted. For those looking for the deepest dive into the proposal, it was recommended that reference be made to the underline/strikeout version of the proposal, with particular attention to the comments included in the margins.

At the end of the allotted study session time period, with additional information still to be presented, it was agreed that the City Attorney would complete the presentation at a scheduled June 15th special session. Council questions and input, along with public testimony, would then again be solicited, with an opportunity for the Council to deliberate and provide further direction to the CRC and staff.

City Council June 15th Special Meeting
At the City Council’s June 15th meeting, as contemplated, the City Attorney completed his presentation of the CRC Final Report. The presentation included a detailed summary of all remaining proposed changes, the CRC’s ultimate recommendation, and other factors to consider (e.g., election costs, what goes before the voters, the need for public education and additional work required if any measure were to pass). Members of the CRC were again in attendance to provide support and answer questions.

After an extensive question and answer segment, the receipt of public testimony and Council deliberations, Council directed staff to:

1. Finalize and bring back for Council action a Charter update ballot measure to include all proposed “Level One” and “Level Two” changes; and

2. Bring back for further Council discussion and action the CRC’s recommendation for updating the Charter’s provisions regarding the Public Works procurement rules.

City Council July 7th Meeting
At the Council’s July 7th meeting, staff’s presentation included a recap of the Charter Project implementation process to date, a summary of the Supplemental Information Memorandum sent to Council on July 1, 2026 and, per Council direction at its June 15th meeting, a deeper dive into the CRC recommendation for an update to the City Charter’s outdated Public Works procurement rules.

The Supplemental Information Memorandum was prepared at the direction of the CRC given at their meeting held on June 17th. It contained further explanation of the CRC’s use of “levels” of proposed changes to develop and present their ultimate Charter Project recommendation, along with a summary of proposed updated changes to the Charter based upon further CRC/staff review, completion of the meet and confer process with labor groups regarding proposed updates to civil service provisions, and input from bond counsel on provisions relating to the process for issuing revenue bonds to finance utility infrastructure. All such changes were highlighted in (attached) updated versions of the Charter documents, presented in both underline/strikeout and clean formats.

Both versions contained updated annotations that further explained each proposed Charter City of Santa Clara Printed on 7/10/2026Page 4 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
modification and identified, on a section-by-section basis, the “Level” of the proposed modifications.

To facilitate review, the assigned Levels within the annotations were color coded as follows: Level One in green, Level Two in blue, and potential Level Three modifications in yellow.

The additional information presented on the CRC’s proposal to update the Charter’s public works provisions included a detailed summary of benchmarking relative to the public works procurement rules used by 19 “comparable” Charter cities. These were the same 19 cities that had been identified and used since the beginning of the Charter Project process for general benchmarking purposes.

Regarding the availability of alternative “best value” public works procurement mechanisms-currently not permitted under the Santa Clara City Charter-it was determined that 17 of the 19 cities allowed the use of such alternatives, with one of the two that didn’t allow such use (Sunnyvale) in the process of proposing a Charter update of their own on the November 2026 ballot to allow it. Regarding the dollar level thresholds for Council approval of contracts, use of City forces, and the requirement for formal bidding, again the vast majority included no Charter specified dollar threshold, instead deferring to state law or implementation by city council ordinance. Santa Clara’s current threshold for these actions is $1,000.

Additional information was also provided regarding the potential benefits of “best value” procurement mechanisms, along with potential risks and commonly used mitigation measures to address those risks. The primary point was that the “best value” public works procurement process is still a competitive process and is one already commonly used by the City in other contract procurement contexts. Chris Karwick, SVP Chief Operating Officer, and Craig Mobeck, Public Works Director, also presented on their support for “best value” procurement as a good option for a number of the more complex projects that will need to be implemented in the City’s near future.

After another round of questions, receipt of public input and Council deliberations, Council took the following actions:

1. Proceed with finalization of the comprehensive “level one” and “level two” Charter amendment measure for City Council final action, including deletion of old Charter Section 714 regarding real estate disposition, and the other updates presented, but reserving for further discussion the proposed update to the revenue bond procedures; and

2. Proceed with the finalization of the proposed public works update (Option A) for City Council final action as a stand-alone measure.

DISCUSSION
The two proposed ballot measures before the City Council are the product of a process first conceived in May 2025 by the Governance and Ethics Committee, formally initiated by City Council in September 2025, and implemented by the Council-formed CRC and professional City staff over nine months beginning in October2025. Both measures would amend the City Charter. The first proposed measure is a comprehensive update of the City Charter. The second proposed measure updates the Charter’s public works procurement provisions.

Comprehensive Charter Update Measure
The comprehensive Charter update proposal recommends amendments throughout the existing Charter. Proposed changes include “Level One” and “Level Two” amendments characterized as follows:

City of Santa Clara Printed on 7/10/2026Page 5 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
Level One
Changes in form and appearance that are not substantive. Includes corrections, rewording for clarity, reorganization, elimination of redundancies, consistency of cross-references and numbering, consolidation of sections, elimination of headings for previously deleted sections, rewording of headings to better reflect content, addition of subheadings, defined terms, and other Charter-wide conventions to improve comprehension and usability.

Level Two
Rewordings, deletions and additions intended to add clarity, fill gaps, eliminate ambiguities, replace outdated (no longer used) practices with current “best” practices, and provide consistency with state law. Some changes are “substantive” but are not thought to be that significant or made in sensitive areas so as to warrant consideration as possible separate ballot measures.

Level Three Changes Excluded
A number of “Level Three” changes were also considered and recommended by the CRC. Level Three changes are those updated policies or procedures that may be considered “best practices” or are otherwise viewed as desirable, and that the CRC recommends, but either involve political sensitivity, or are of such independent significance, they may justify consideration as separate ballot measures. Potential Level Three measures that had been part of the CRC recommendation include:
(1) Modifications to Measure R to allow “secondary uses” of park property provided no adverse impact, five affirmative votes of the City Council, and all revenues for park purposes; (2) deletion of published notice and public bid opportunity on sale of City property above $500; (3) Chief of Police increased qualifications (lieutenant for two years) and duties (head of the department; duty to advise the City Council and City Manager on law enforcement/public safety issues); (4) Public Works procurement update to be implemented by ordinance with alternative procurement mechanisms allowed; and (5) Civil Service Rules changes not approved by labor groups as part of the meet and confer process.

With the exception of the public works update (proposed as a stand-alone measure and described below), and the deletion of the real estate published notice/bid requirement (determined to be a Level Two change), the City Council direction for the comprehensive update measure excluded the above- described Level Three amendments. Accordingly, all such Level Three amendments have now been excluded from the proposed comprehensive Charter amendment update.

Additional Changes Since the Presentation of the CRC Final Report The vast majority of the proposed comprehensive Charter amendments are summarized in the CRC Final Report (Attachment 1) and are presented explicitly in the draft Charter documents dated June 5, 2026, attached to the Final Report. A few additional changes made since the June 5, 2026 draft are presented in the updated draft Charter documents attached to this report (Attachments 2 and 3).

These changes were presented to Council at the July 7th Council meeting. Such changes include:
• Added reference to a policy for recusal for City Council members (Section 205.1(7)) • Updated reference to most recent redistricting map as “baseline” for District elections (Section 303.1)
• Reinsertion of reference to 72/24-hour notice requirements for Regular/Special Meetings (Section 401.4)
• Reversion to language for City Engineer to be appointed by the City Manager, but now in City of Santa Clara Printed on 7/10/2026Page 6 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
consultation with the Public Works Director (Section 502.2) • Reversion to minor (but useful) “clean up” changes to Civil Service Sections in light of inability to reach agreement on more substantive changes with labor groups (new Sections 604.3 and Article Seven)
Revenue Bond Language Update
Another more substantive change presented to Council at the July 7th Council meeting was a proposed refinement of proposed language regarding revenue bond financing for utility infrastructure.

After consultation with bond counsel, it is proposed that revisions be made to provisions for the issuance of revenue bonds to finance utility infrastructure. These changes are presented in new Section 805.6.

They replace what bond counsel and City staff consider to be outdated language set forth in existing Charter Section 1321. The language in new Section 805.6 is consistent with current/best practices for utility infrastructure financing. It would allow the City to issue revenue bonds to finance utility infrastructure pursuant to a City Council resolution, without the requirement for voter approval.

The rationale for this is that revenue bond debt is not like general fund debt that relies on new taxes for repayment. Under state law, that type of general obligation bond debt requires voter approval.

Instead, repayment of utility revenue bond debt is secured solely by a pledge of actually received utility enterprise revenues. Many other Charter cities including Sunnyvale, San Diego, Los Angeles, Hayward, Oakland, Pasadena, Redwood City, Sacramento, and San Francisco have similar provisions in their charters.

The deleted provisions regarding revenue bond financing are considered to be outdated and restrictive in ways that go beyond current state law limitations and best practices that have evolved over time. Although in the interim, the City has been able to finance utility infrastructure using debt financing without voter approval (for example, using certificates of participation), this finance mechanism is more cumbersome and costly.

Another important factor is that the existing Charter already allows for the issuance of revenue bonds without a vote of the people to finance infrastructure for the City’s electric utility, Silicon Valley Power.

It’s only the City’s water and sewer utilities that are limited by the requirement for a public vote for revenue bond financing. There is no discernable reason to keep this limitation in place under these circumstances.

In light of the above, outside bond counsel and the City’s finance team strongly recommend that the existing provisions for revenue bond financing be replaced with the provisions and guidelines set forth in new Section 805.6.

Ballot Question
The proposed ballot question for the Comprehensive Charter Update Measures is set forth below.

This measure has been reviewed and reflects input from the City’s political consultant Jared Boigon from TeamCivX. (Mr. Boigon and Team CivX also advised the City in connection with Measure I.) The proposed draft meets all Elections Code legal requirements, including the 75-word limit.

COMPREHENSIVE CHARTER AMENDMENT. Shall the measure proposing a comprehensive update to the City Charter to eliminate outdated provisions, clarify ambiguous terms, reorganize and reformat to improve usability, and update provisions to align with current/best practices, including new and updated provisions for defining and filling vacancies in elected/appointed positions, modernizing elected and appointed officials roles and duties, requirements for approval of laws, budget implementation, financing options, legal notice, and other similar enhancements to City operations and procedures, be adopted? Yes
No
City of Santa Clara Printed on 7/10/2026Page 7 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
COMPREHENSIVE CHARTER AMENDMENT. Shall the measure proposing a comprehensive update to the City Charter to eliminate outdated provisions, clarify ambiguous terms, reorganize and reformat to improve usability, and update provisions to align with current/best practices, including new and updated provisions for defining and filling vacancies in elected/appointed positions, modernizing elected and appointed officials roles and duties, requirements for approval of laws, budget implementation, financing options, legal notice, and other similar enhancements to City operations and procedures, be adopted? Yes
No
Public Works Procurement Update
The City’s current Charter Section 1310 governing public works procurement is highly outdated.

Under this Section, City Council approval and formal bidding is required for any public works contract valued at more than $1,000. Similarly, Council approval is required to use City forces for any public work valued at over $1,000. (By contrast, the threshold for Council approval of non-public works contracts is $250,000.) Implementing these requirements for public works consumes a substantial amount of time and staff resources, with no comparable public benefit. Further, under existing Charter language, there is no provision that allows the City to use alternative “best value” public works procurement mechanisms (for example, design-build). For substantial public works, especially those with highly technical design elements, design-build and related “best value” procurement mechanisms can add substantial value by shortening project delivery timeframes, enhancing project quality, managing project costs, and reducing change order risks. Accordingly, such measures are used throughout the state by both charter cities and general law cities alike. A number of upcoming City projects (SVP infrastructure and Measure I Projects like Fire Station rebuilds and the International Swim Center) have already been identified as good candidates for this type of approach.

In consideration of the above, the CRC and City professional staff are highly supportive of the proposed update to the Charter that would eliminate the outdated City Council approval/formal bid dollar thresholds and allow for the use of “best value” public works procurement mechanisms.

The proposed update to old Charter Section 1310 is contained in new Charter Section 802.2 (Option A). In summary the proposed change replaces the existing Charter language with the outline of an ordinance containing the following provisions:

1. Definition of “major” versus “minor” contracts with major contracts approved by Council

2. Competitive bid processes for all contracts, with formal advertisement for bids and sealed bids required for all “major” contracts

3. Contracts awarded to the lowest responsive and responsible bidder unless exception

4. Ability to reject, re-advertise or waive minor defects if determined necessary or appropriate for the benefit of the public

5. Emergency authority to waive the applicable competitive bid process requirements

6. Provision to implement Public Works using City employees upon determination that the work can be performed better or more economically by City employees;

7. Exceptions for maintenance, repair, restoration, minor improvements, equipment installation/acquisition but still subject to other competitive procurement standards City of Santa Clara Printed on 7/10/2026Page 8 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026

8. Alternative mechanisms including “sole source” and “best value” if appropriate findings are made, with standards for selection, and as part of City-wide program.

Ballot Question
The proposed ballot question for the Public Works Update Measures is set forth below. This measure has also been reviewed and reflects input from the City’s political consultant Jared Boigon from TeamCivX. The draft meets all Elections Code legal requirements, including the 75-word limit.

PUBLIC WORKS CHARTER AMENDMENT. Shall the measure proposing to amend the City Charter to update rules for the construction of public works to allow for competitive “best value” contracting to improve project quality, expedite needed project completion, and minimize risks, retaining City Council authority to approve major contracts, require formal bidding and award contracts to the lowest responsive and responsible bidder, all as set forth in a City ordinance presented and approved at a public meeting, be adopted? Yes
No
Staff Recommendation/Next Steps
Consistent with the recommendation of the CRC to the City Council, and previous City Council direction, staff recommends that the City Council take action, through the adoption of the attached Resolution to place two measures on the November 2026 ballot that would amend the City Charter as follows: (1) Implement a Comprehensive Update of the City Charter; and (2) Update the City’s Public Works Procurement Rules as Currently Set Forth in Charter Section 1310 (Contracts on public works).

Related/required actions in the proposed Resolution include the following:
· Request the Consolidation of the Municipal Election with the Statewide General Election to be Held in Santa Clara County on November 3, 2026;
· Direct the City Attorney to Prepare the Impartial Analyses for the Two Measures; and · Setting Priorities and Schedules for the Ballot Arguments Attached to the Resolution is the actual language for the proposed Charter Amendments. The Resolution includes a provision which would allow the City Clerk and the City Attorney, in concurrence, to make non-substantive changes where such changes are administrative modifications that correct or clarify a measure without altering intent, scope, legal or mandatory requirements, or meaning. The City Attorney and the City Clerk’s Office will work together to ensure the ballot measure (s) the Council takes final action to present to voters are accurate and in final form to be provided to the County Registrar of Voters by August 7, 2026. All and any such changes would be presented to the Council for ratification before the November 2026 election.

Ballot Arguments and Impartial Analysis
The City Council determines whether the Council, or specific members authorized by the full Council, will draft the argument supporting the ballot measure, or whether it will instead allow a third party to do so. The City Charter and the California Elections Code authorize, but do not require, the City Council to write the argument in support of the ballot measure.

If the City Council chooses to write the ballot argument, it should designate a maximum of three Council Members to draft City of Santa Clara Printed on 7/10/2026Page 9 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026
the argument. Under the circumstances, it would also be appropriate to consider one or more members of the CRC to be included as part of the drafting team. These designees would prepare and sign the argument and submit it to the City Clerk. Alternatively, the Council can designate the Mayor to sign on behalf of the entire Council. A total of five individuals and/or organizations may sign the ballot argument, and the Council may designate which individuals or organizations fill any available signature slots.

If the City Council decides not to draft the argument itself, any registered voter or bona fide association of citizens may submit a proposed argument to the City Clerk. If the City Clerk receives multiple proposed arguments, the City Clerk shall select one of the arguments in adherence to Elections Code § 9287. Ballot arguments must be submitted no later than July 28th to the City Clerk and rebuttal arguments must be submitted no later than August 7th to the City Clerk. If the City Council so directs, the City Attorney shall draft an impartial analysis on the measure, which is also due on August 7th to the City Clerk.

Voter Education and Outreach
In order to provide information to voters as they consider the proposed ballot measures to be placed on the November 3, 2026 ballot, a Communications Outreach plan will be created. This plan will utilize the many public outreach channels available to the City and accessible by Santa Clara residents. That plan will be prepared and brought back for Council action. The plan is expected to include the following elements:
· City website and e-Notify
· Social Media (Facebook, Twitter, NextDoor)
· Government Access Channels
· Press Release
· Publication of ad in local and ethnic media outlets
· Postcard mailers to all Santa Clara residents
· Flyer distribution to City facilities
· Flyer email distribution to constituent database and community leaders/groups · Utility bill inserts
· Public Forums, with support from CRC members and professional staff · Translation of materials in eight languages including, Chinese, Hindi, Korean, Japanese, Portuguese, Spanish, Tagalog and Vietnamese

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(5) in that it is a governmental organizational or administrative activity that will not result in direct or indirect changes in the environment.

FISCAL IMPACT
Staff time and resources will be needed to finalize materials for placement on the November ballot. As of July 7, 2026, the ROV’s estimated cost for placement of two measures on the ballot, not to exceed six pages each, is $139,058 per measure, for a total estimated cost of $278,116. Combined with the estimated costs for the elections of the Mayor ($308,279) and Council District Seats 2 and 3 (combined, $31,568), the current total estimated cost for the November election is $617,963. The City Clerk’s election budget currently includes $574,824. Consistent with past practices, no budget action is required at this time. Once the actual bill from the ROV is submitted, and the City Clerk’s budget is reconciled, if additional funding is needed, the Director of Finance would bring back any required budget adjustment along with other adjustments needed at that time.

If a measure passes, additional staff time and resources would also be necessary to implement the Charter section reference changes throughout existing City documents that reference the Charter, and to prepare any contemplated ordinances or policies. Ultimately, it is expected that the modernized terms of any approved comprehensive Charter update will result in net savings to the City in staff time and resources.

COORDINATION
This report has been prepared by the City Attorney’s Office with input from the City Clerk’s Office and coordinated with the City Manager’s Office and f Finance Department.

City of Santa Clara Printed on 7/10/2026Page 10 of 11
powered by Legistar™
26-784 Agenda Date: 7/14/2026

RECOMMENDATION
Adopt the Resolution in substantially the form presented and authorize staff to take such additional measures as are necessary and appropriate to finalize the Resolution place the proposed ballot measures on the November 3, 2026 General Election ballot.

Generated and Approved by: Glen Googins, City Attorney

ATTACHMENTS

1. Draft Resolution Calling and Giving Notice of a Municipal Election for Two Ballot Measures, a Comprehensive Charter Update Amendment and a Public Works Procurement Rules Charter Update Amendment, and Related Matters

2. Comprehensive City Charter Update Including All Proposed Modifications, Underline/Strikeout with Annotations (updated per the Memorandum to Council from the City Attorney dated July 1, 2026)

3. Comprehensive City Charter Update Including All Proposed Modifications, “Clean” Version with Annotations (updated per the Memorandum to Council from the City Attorney dated July 1, 2026)

4. “Stand-Alone” Public Works Update Language
City of Santa Clara Printed on 7/10/2026Page 11 of 11
powered by Legistar™